Sample records for routine monitoring maintenance

  1. Routine environmental monitoring schedule, calendar year 1998

    SciTech Connect (OSTI)

    McKinney, S.M.

    1997-11-24T23:59:59.000Z

    This document provides the Environmental Restorations Contractor (ERC) and the Project Hanford Management Contractor (PHMC) a schedule in accordance with the HNF-PRO-454, Inactive Waste Sites` HNF-PRO-455, Solid Waste 3 Management4 and BHI-EE-02, Environmental Requirements, of monitoring and sampling, routines for the near-facility environmental monitoring program during calendar year (CY) 1998. Every attempt will be made to consistently follow this schedule; any deviation from this schedule will be documented by an internal memorandum (DSI) explaining the reason for the deviation. The DSI will be issued by the scheduled performing organization and directed to Environmental Monitoring and Investigations. The survey frequencies for particular sites are determined by the technical judgment of Environmental Monitoring and investigations and may depend on the site history, radiological status, use, and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive wastes sites are scheduled to be surveyed at least annually. Any newly discovered wastes sites not documented by this schedule will be included in the revised schedule for CY 1999. The outside perimeter road surveys of 200 East and West Area and the rail survey from the 300 Area to Columbia Center will be performed in the year 2000 per agreement with Department of Energy, Richland Field Office. This schedule does not discuss staffing needs, nor does it list the monitoring equipment to be used in completing specific routines. Personnel performing routines to meet this schedule shall communicate any need for 1332 assistance in completing these routines to Radiological Control management and Environmental Monitoring and Investigations. After each routine survey is completed, a copy of the survey record, maps, and data sheets will be forwarded to Environmental Monitoring and Investigations. These routine surveys will not be considered complete until this documentation is received. At the end of each month, the ERC and PHMC radiological control organizations shall forward a copy of the Routine Signoff Sheet and a DSI validating the completion of the scheduled routine surveys for that month.

  2. Routine Operational Environmental Monitoring schedule, CY 1994

    SciTech Connect (OSTI)

    Schmidt, J.W.

    1993-12-01T23:59:59.000Z

    This document provides Health Physics (HP) a schedule in accordance with the Environmental Compliance Manual, WHC-CM-7-5, of monitoring and sampling routines for the Operational Environmental Monitoring (OEM) Program during calendar year (CY) 1994. The survey frequencies for particular sites are determined by the technical judgment of EES and may depend on the site history, radiological status, use, and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive waste sites are scheduled to be surveyed annually at a minimum. Any newly discovered waste sites not documented by this schedule will be included in the revised schedule for CY 1995. This schedule does not discuss the manpower needs nor does it list the monitoring equipment to be used in completing specific routines.

  3. Oracle-Saguaro 115-kV Transmission Line Routine Maintenance Project...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Oracle-Saguaro 115-kV Transmission Line Routine Maintenance Project, Mile 6 to Oracle Substation Categorical Exclusion Continuation Sheet Project Description Maintenance work at...

  4. Routine environmental monitoring schedule, calendar year 1995

    SciTech Connect (OSTI)

    Schmidt, J.W.; Markes, B.M.; McKinney, S.M.

    1994-12-01T23:59:59.000Z

    This document provides Bechtel Hanford, Inc. (BHI) and Westinghouse Hanford Company (WHC) a schedule of monitoring and sampling routines for the Operational Environmental Monitoring (OEM) program during calendar year (CY) 1995. Every attempt will be made to consistently follow this schedule; any deviation from this schedule will be documented by an internal memorandum (DSI) explaining the reason for the deviation. The DSI will be issued by the scheduled performing organization and directed to Near-Field Monitoring. The survey frequencies for particular sites are determined by the technical judgment of Near-Field Monitoring and may depend on the site history, radiological status, use and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive wastes sites are scheduled to be surveyed at least annually. Any newly discovered wastes sites not documented by this schedule will be included in the revised schedule for CY 1995.

  5. The feasibility of replacing or upgrading utility distribution transformers during routine maintenance

    SciTech Connect (OSTI)

    Barnes, P.R.; Van Dyke, J.W.; McConnell, B.W.; Cohn, S.M.; Purucker, S.L.

    1995-04-01T23:59:59.000Z

    It is estimated that electric utilities use about 40 million distribution transformers in supplying electricity to customers in the United States. Although utility distribution transformers collectively have a high average efficiency, they account for approximately 61 billion kWh of the 229 billion kWh of energy lost annually in the delivery of electricity. Distribution transformers are being replaced over time by new, more efficient, lower-loss units during routine utility maintenance of power distribution systems. Maintenance is typically not performed on units in service. However, units removed from service with appreciable remaining life are often refurbished and returned to stock. Distribution transformers may be removed from service for many reasons, including failure, over- or underloading, or line upgrades such as voltage changes or rerouting. When distribution transformers are removed from service, a decision must be made whether to dispose of the transformer and purchase a lower-loss replacement or to refurbish the transformer and return it to stock for future use. This report contains findings and recommendations on replacing utility distribution transformers during routine maintenance, which is required by section 124(c) of the Energy Policy Act of 1992. The objectives of the study are to evaluate the practicability, cost-effectiveness, and potential energy savings of replacing or upgrading existing transformers during routine utility maintenance and to develop recommendations on was to achieve the potential energy savings.

  6. Results of calendar year 1994 monitor well inspection and maintenance program, Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    McMaster, B.W. [Univ. of Tennessee, Knoxville, TN (United States); Jones, S.B.; Sitzler, J.L. [Oak Ridge National Lab., TN (United States)

    1995-06-01T23:59:59.000Z

    This document is a compendium of results of the calendar year 1994 Monitor Well Inspection and Maintenance Program at the Department of Energy Y-12 Plant in Oak Ridge, Tennessee. This report documents the work relating to well inspections and maintenance requests. Inspections are implemented in order to better assess the condition and maintenance needs of wells that are actively being monitored. Currently this approach calls for inspecting all wells on a routine (annual or triennial) basis which are: (1) in an active sampling program; (2) included in a hydrologic study; or (3) not in service, but not scheduled for plugging and abandonment. Routine inspections help to ensure that representative groundwater samples and hydrologic data are being collected, and contribute to the life expectancy of each well. This report formally presents well inspection and maintenance activities that were conducted at the Y-12 Plant during 1994. All inspections were conducted between April and December.

  7. Routine Radiological Environmental Monitoring Plan, Volume 2 Appendices

    SciTech Connect (OSTI)

    Bechtel Nevada

    1998-12-31T23:59:59.000Z

    Supporting material for the plan includes: QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR NTS AIR; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR WATER ON AND OFF THE NEVADA TEST SITE; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR NTS BIOTA; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR DIRECT RADIATION MONITORING; DATA QUALITY OBJECTIVES PROCESS; VADOSE ZONE MONITORING PLAN CHECKLIST.

  8. Increasing Child Compliance with Essential Healthcare Routines: Acquisition, Maintenance, and Generalization

    E-Print Network [OSTI]

    Harrison, Kelley Lynne Attix

    2014-08-31T23:59:59.000Z

    be effective and by assessing whether the effects of compliance training in an analogue setting will generalize to the actual healthcare setting. Keywords: demand fading, differential reinforcement, essential healthcare routines, compliance, problem behavior...

  9. Standard hydrogen monitoring system-B operation and maintenance manual

    SciTech Connect (OSTI)

    Bender, R.M.

    1995-01-25T23:59:59.000Z

    The purpose of this document is to provide information for the operation and maintenance of the Standards Hydrogen Monitoring System-B (SHMS-B) used in the 200E and 200W area tank farms on the Hanford site. This provides information specific to the mechanical operation of the system and is not intended to take the place of a Plant Operating Procedure. The primary function of the SHMS-B is to monitor specifically for hydrogen in the waste tank vapor space which may also contain unknown quantities of other gaseous constituents.

  10. Anomaly detection in monitoring sensor data for preventive maintenance Julien Rabatel a,b,

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Anomaly detection in monitoring sensor data for preventive maintenance Julien Rabatel a,b, , Sandra Preventive maintenance a b s t r a c t Today, many industrial companies must face problems raised to make predictive maintenance to prevent a serious breakdown. In addition, the corrective maintenance

  11. Iraq liquid radioactive waste tanks maintenance and monitoring program plan.

    SciTech Connect (OSTI)

    Dennis, Matthew L.; Cochran, John Russell; Sol Shamsaldin, Emad (Iraq Ministry of Science and Technology)

    2011-10-01T23:59:59.000Z

    The purpose of this report is to develop a project management plan for maintaining and monitoring liquid radioactive waste tanks at Iraq's Al-Tuwaitha Nuclear Research Center. Based on information from several sources, the Al-Tuwaitha site has approximately 30 waste tanks that contain varying amounts of liquid or sludge radioactive waste. All of the tanks have been non-operational for over 20 years and most have limited characterization. The program plan embodied in this document provides guidance on conducting radiological surveys, posting radiation control areas and controlling access, performing tank hazard assessments to remove debris and gain access, and conducting routine tank inspections. This program plan provides general advice on how to sample and characterize tank contents, and how to prioritize tanks for soil sampling and borehole monitoring.

  12. Mobile Monitoring and Maintenance of Power Systems Bing JIANG and Alexander V. MAMISHEV

    E-Print Network [OSTI]

    Mamishev, Alexander

    Mobile Monitoring and Maintenance of Power Systems Bing JIANG and Alexander V. MAMISHEV Sensors networks in the new environment. Monitoring of electric power systems in real-time for reliability, aging, robotics. This review paper fo- cuses on one trend of power system monitoring, namely, mobile monitoring

  13. EA-1982: Parker-Davis Transmission System Routine Operation and Maintenance Project and Proposed Integrated Vegetation Management Plan

    Broader source: Energy.gov [DOE]

    Western Area Power Administration (Western) is preparing an EA to assess potential environmental impacts of the proposed continuation of operations and maintenance activities and implementation of a vegetation management program on Western’s Parker-Davis Transmission System. These actions would occur on existing transmission line and access road rights-of-way, and at substations and maintenance facilities associated with the transmission system.

  14. Y-12 Groundwater Protection Program Monitoring Well Inspection and Maintenance Plan

    SciTech Connect (OSTI)

    None

    2013-09-01T23:59:59.000Z

    This document is the fourth revision of the Monitoring Well Inspection and Maintenance Plan for groundwater monitoring wells installed at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. This plan describes the systematic approach for: inspecting the physical condition of monitoring wells at Y-12, determining maintenance needs that extend the life of a well, and identifying those wells that no longer meet acceptable monitoring well design or well construction standards and require plugging and abandonment. This plan applies to groundwater monitoring wells installed at Y-12 and the related waste management facilities located within the three hydrogeologic regimes.

  15. Evaluation of non-intrusive monitoring for condition based maintenance applications on US Navy propulsion plants

    E-Print Network [OSTI]

    Greene, William C. (William Calvin)

    2005-01-01T23:59:59.000Z

    The thesis explores the use of the Non-intrusive Load Monitor (NILM) in Condition Based Maintenance (CBM) applications on US Navy ships as part of the Office of Naval Research Electric Ship Integration (ESI) Initiative. ...

  16. Y-12 Groundwater Protection Program Monitoring Well Inspection And Maintenance Plan

    SciTech Connect (OSTI)

    none,

    2013-09-01T23:59:59.000Z

    This document is the fourth revision of the Monitoring Well Inspection and Maintenance Plan for groundwater monitoring wells installed at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. This plan describes the systematic approach for:  inspecting the physical condition of monitoring wells at Y-12,  determining maintenance needs that extend the life of a well, and  identifying those wells that no longer meet acceptable monitoring well design or well construction standards and require plugging and abandonment.

  17. The Savannah River Site`s Groundwater Monitoring Program 1993 well installation, abandonment, and maintenance report

    SciTech Connect (OSTI)

    Not Available

    1994-06-01T23:59:59.000Z

    This report is a summary of the well and environmental soil boring information compiled for the groundwater monitoring program of the Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) at the Savannah River Site (SRS) during 1993. It includes discussions of environmental soil borings, surveying, well construction, abandonments, maintenance, and stabilization. EPD/EMS is responsible for monitoring constituents in the groundwater at approximately 135 waste sites in 16 areas at SRS. The majority of this monitoring is required by US Department of Energy (DOE) orders and by federal and state regulations administered by the US Environmental Protection Agency (EPA) and the South Carolina Department of Health and Environmental Control (SCDHEC). The groundwater monitoring program includes the following activities: installation, maintenance, and abandonment of monitoring wells; environmental soil borings; development of sampling and analytical schedules; collection and analyses of groundwater samples; review of analytical and other data; maintenance of the databases containing groundwater monitoring data; quality assurance (QA) evaluations of laboratory performance; and reports of results to waste site facility custodians and to the Environmental Protection Section (EPS) of EPD. EPD/EMS is responsible for monitoring the wells but is not responsible for the facilities that are monitored. It is the responsibility of the custodian of each waste site to ensure that EPD/EMS is informed of sampling requirements and special requests for the sampling schedule, to assist in reviewing the data, and to make any decisions regarding groundwater monitoring at the waste site.

  18. A CULTURAL RESOURCES MONITORING AND DISCOVERY PLAN FOR MAINTENANCE...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to potential discovery situations and to evaluate the discoveries eligibility for NRHP listing. FINAL Monitoring and Discovery Plan 12 EPG Western Area Power Administration...

  19. WSDOT highway maintenance: environmental compliance for protected terrestrial species

    E-Print Network [OSTI]

    O’Brien, Tracie; Carey, Marion; Forrester, Bret

    2005-01-01T23:59:59.000Z

    of the WSDOT Highway Maintenance: Environmental Complianceand the Highway Maintenance Manual for Terrestrial Species.to impacts from routine maintenance activities. In response

  20. Washington State Department of Transportation Bridge Maintenance and Inspection Guidance for Protected Terrestrial Species

    E-Print Network [OSTI]

    Carey, Marion

    2007-01-01T23:59:59.000Z

    impacts from routine maintenance and inspection activities.expanded their Highway Maintenance Environmental Complianceand one specific to maintenance activities. The guidance is

  1. Decontamination and decommissioning surveillance and maintenance report for FY 1991

    SciTech Connect (OSTI)

    Gunter, David B.; Burwinkle, T. W.; Cannon, T. R.; Ford, M. K.; Holder, Jr., L.; Clotfelter, O. K.; Faulkner, R. L.; Smith, D. L.; Wooten, H. O.

    1991-12-01T23:59:59.000Z

    The Decontamination and Decommissioning (D D) Program has three distinct phases: (1) surveillance and maintenance (S M); (2) decontamination and removal of hazardous materials and equipment (which DOE Headquarters in Washington, D.C., calls Phase I of remediation); and (3) decommissioning and ultimate disposal, regulatory compliance monitoring, and property transfer (which DOE Headquarters calls Phase II of remediation). A large part of D D is devoted to S M at each of the sites. Our S M activities, which are performed on facilities awaiting decommissioning, are designed to minimize potential hazards to human health and the environment by: ensuring adequate containment of residual radioactive and hazardous materials; and, providing physical safety and security controls to minimize potential hazards to on-site personnel and the general public. Typically, we classify maintenance activities as either routine or special (major repairs). Routine maintenance includes such activities as painting, cleaning, vegetation control, minor structural repairs, filter changes, and building system(s) checks. Special maintenance includes Occupational Safety and Health Act facility upgrades, roof repairs, and equipment overhaul. Surveillance activities include inspections, radiological measurements, reporting, records maintenance, and security (as required) for controlling and monitoring access to facilities. This report summarizes out FY 1991 S M activities for the Tennessee plant sites, which include the K-25 Site, the Gas Centrifuge facilities, ORNL, and the Y-12 Plant.

  2. Vehicle Maintenance Policy Outline the policy regarding vehicle maintenance at University of Michigan (U-M).

    E-Print Network [OSTI]

    Kirschner, Denise

    Vehicle Maintenance Policy Objective Outline the policy regarding vehicle maintenance at University of Michigan (U-M). Policy 1. All maintenance performed on U-M vehicles must be coordinated through Garage to repair their fleet vehicles. 2. U-M vehicles leased through Fleet Services include routine maintenance

  3. Field Demonstration of a Real-time Non-intrusive Monitoring System for Condition-based Maintenance

    E-Print Network [OSTI]

    Proper, Ethan

    2009-01-01T23:59:59.000Z

    The performance of important electrical loads on mission critical systems like warships or off-shore platforms is often tracked by dedicated monitoring equipment. Individual monitoring of each load is expensive and risky. ...

  4. Proposal for the award of a contract for the supply, installation and maintenance of radiation and environmental monitoring for the LHC

    E-Print Network [OSTI]

    2003-01-01T23:59:59.000Z

    This document concerns the award of a contract for the supply, installation and maintenance of radiation and environmental monitoring for the LHC. Following a market survey carried out among 53 firms in twelve Member States, a call for tenders (IT-3091/TIS/LHC) was sent on 17 July 2003 to seven firms and five consortia in eight Member States. By the closing date, CERN had received seven tenders from one firm and six consortia in six Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium ASSYSTEM INDUSTRIAL SERVICES (FR) - GENITRON INSTRUMENTS (DE), the lowest bidder, for the supply, installation and maintenance of radiation and environmental monitoring for the LHC for a total amount not exceeding 5 474 000 euros (8 457 000 Swiss francs), subject to revision for inflation after 1 January 2007. The rate of exchange used is that stipulated in the tender. The consortium has indicated the following distribution by country of the contract value covered by this ...

  5. Maintenance Types

    Broader source: Energy.gov [DOE]

    Proper operations and maintenance (O&M) goes beyond repairing equipment after it breaks. Several maintenance strategies exist to prevent systems disrepair and degradation. A combination of the...

  6. Home Maintenance and Repair Owning a home is a major responsibility.

    E-Print Network [OSTI]

    maintenance is conducted. Regular, preventive maintenance can pay off in peace of mind, utility cost savings, routine maintenance helps to prolong the life of the home and may prevent the need for major repairs of Benjamin Franklin, "An ounce of prevention is worth a pound of cure." Regular, routine maintenance enhances

  7. Decontamination and decommissioning surveillance and maintenance report for FY 1991. Environmental Restoration Program

    SciTech Connect (OSTI)

    Burwinkle, T. W.; Cannon, T. R.; Ford, M. K.; Holder, Jr., L.; Clotfelter, O. K.; Faulkner, R. L.; Smith, D. L.; Wooten, H. O.

    1991-12-01T23:59:59.000Z

    The Decontamination and Decommissioning (D&D) Program has three distinct phases: (1) surveillance and maintenance (S&M); (2) decontamination and removal of hazardous materials and equipment (which DOE Headquarters in Washington, D.C., calls Phase I of remediation); and (3) decommissioning and ultimate disposal, regulatory compliance monitoring, and property transfer (which DOE Headquarters calls Phase II of remediation). A large part of D&D is devoted to S&M at each of the sites. Our S&M activities, which are performed on facilities awaiting decommissioning, are designed to minimize potential hazards to human health and the environment by: ensuring adequate containment of residual radioactive and hazardous materials; and, providing physical safety and security controls to minimize potential hazards to on-site personnel and the general public. Typically, we classify maintenance activities as either routine or special (major repairs). Routine maintenance includes such activities as painting, cleaning, vegetation control, minor structural repairs, filter changes, and building system(s) checks. Special maintenance includes Occupational Safety and Health Act facility upgrades, roof repairs, and equipment overhaul. Surveillance activities include inspections, radiological measurements, reporting, records maintenance, and security (as required) for controlling and monitoring access to facilities. This report summarizes out FY 1991 S&M activities for the Tennessee plant sites, which include the K-25 Site, the Gas Centrifuge facilities, ORNL, and the Y-12 Plant.

  8. Reactive Maintenance

    Broader source: Energy.gov [DOE]

    Reactive maintenance follows a run-it-until-it-breaks strategy where no actions or efforts are taken to maintain equipment as intended by the manufacturer. Studies indicate this is still the predominant mode of maintenance for Federal facilities.

  9. Inspection & Maintenance

    E-Print Network [OSTI]

    vehicles they own or control: 1. Preventative maintenance/safety inspections at least every 3 to 6 months provides a Preventive Maintenance Check List for guidance and scheduling. 2. If a vehicle is under warranty, Fleet Services will ensure the vehicle has at least the normal preventative, scheduled maintenance

  10. B1.3 SWCX for Routine Maintenance Services-

    Broader source: Energy.gov (indexed) [DOE]

    facilities, including conductors of the same voltage, poles, circuit breakers, transformers, capacitors, crossarms, insulators, and downed transmission lines, and Testing and...

  11. Condition-based maintenance under an imperfect repair policy for a deteriorating production system

    E-Print Network [OSTI]

    Boyer, Edmond

    is periodically monitored. Imperfect preventive maintenance activities, which restore the production system policy, both linear and non-linear imperfect preventive maintenance cost functions are investigated preventive maintenance (or preventive replacement) is usually used. After each preventive maintenance action

  12. Operations & Maintenance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations and Maintenance Operations OASIS: OATI (Note: this site is not hosted by Western and requires a digital certificate and login for full access.) Contact Information...

  13. Operations & Maintenance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Rates Operations & Maintenance Operations OASIS: WACM (Note: this site is not hosted by Western and requires a digital certificate and login for full access.) wesTTrans Common...

  14. Operations & Maintenance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Resources Contact Information Transmission Planning Western OATT Revision Maintenance Data Outage Coordination Request (Doc - 21K) Right of Way - Vegetation Management...

  15. Published in `AI Communications 9 journal', pp1-17. Published by IOS Press (1996) TIGERTM: Knowledge Based Gas Turbine Condition Monitoring

    E-Print Network [OSTI]

    Travé-Massuyès, Louise

    : Knowledge Based Gas Turbine Condition Monitoring Dr. Robert Milne and Dr. Charlie Nicol Intelligent, 11 Colon, Barcelona, 08222 Terrassa. Spain 1. INTRODUCTION Given the critical nature of gas turbines and increasing the availability of the gas turbine. Routine preventative maintenance techniques have been used

  16. Predictive Maintenance

    Broader source: Energy.gov [DOE]

    Predictive maintenance aims to detect equipment degradation and address problems as they arise. The result indicates potential issues, which are controlled or eliminated prior to any significant system deterioration.

  17. Preventive Maintenance

    Broader source: Energy.gov [DOE]

    Preventive maintenance aims to sustain and/or extend system lifespan through a set of actions that detect, preclude, or mitigate system degradation. These actions are based on either calendar time or machine run time.

  18. Microsoft Word - CX-Colville-Republic-Maintenance-FY13_WEB.docx

    Broader source: Energy.gov (indexed) [DOE]

    3 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Terry Kugler Lineman Foreman III - TFSF-Bell Proposed Action: Routine maintenance on the Colville-Republic...

  19. Reliability-Centered Maintenance

    Broader source: Energy.gov [DOE]

    Reliability-centered maintenance leverages the same practices and technologies of predictive maintenance.

  20. Environmental Monitoring Plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1993-09-01T23:59:59.000Z

    This document presents the Environmental Monitoring Plan (EMP) for Waste Area Grouping (WAG) 6 at the Oak Ridge National Laboratory (ORNL). Based on the results of the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) and on subsequent discussions with regulators, a decision was made to defer implementing source control remedial measures at the WAG. The alternative selected to address the risks associated with WAG 6 involves maintenance of site access controls prevent public exposure to on-site contaminants, continued monitoring of contaminant releases determine if source control measures are required, and development of technologies that could support the final remediation of WAG 6. Although active source control measures are not being implemented at WAG 6, environmental monitoring is necessary to ensure that any potential changes in contaminant release from the WAG are identified early enough to take appropriate action. Two types of environmental monitoring will be conducted: baseline monitoring and annual routine monitoring. The baseline monitoring will be conducted to establish the baseline contaminant release conditions at the WAG, confirm the site-related chemicals of concern (COCs), and gather data to confirm the site hydrologic model. The baseline monitoring is expected to begin in 1994 and last for 12--18 months. The annual routine monitoring will consist of continued sampling and analyses of COCs to determine off-WAG contaminant flux and risk, identify mills in releases, and confirm the primary contributors to risk. The annual routine monitoring will continue for {approximately} 4 years after completion of the baseline monitoring.

  1. Y-12 Groundwater Protection Program CY 2009 Triennial Report Of The Monitoring Well Inspection And Maintenance Program, Y-12 National Security Complex, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    none,

    2013-06-01T23:59:59.000Z

    This document is the triennial report for the Well Inspection and Maintenance Program of the Y- 12 Groundwater Protection Program (GWPP), at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12). This report formally documents well inspection events conducted on active and inactive wells at Y-12 during calendar years (CY) 2007 through 2009; it documents well maintenance and plugging and abandonment activities completed since the last triennial inspection event (CY 2006); and provides summary tables of well inspection events, well maintenance events, and well plugging and abandonment events during the reference time period.

  2. Genepool Quarterly Maintenance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Genepool Quarterly Maintenance Genepool Quarterly Maintenance November 7, 2012 by Kirsten Fagnan (0 Comments) The Genepool cluster will be offline for maintenance next Tuesday,...

  3. Y-12 Groundwater Protection Program CY2012 Triennial Report Of The Monitoring Well Inspection And Maintenance Program Y-12 National Security Complex, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    none,

    2013-09-01T23:59:59.000Z

    This document is the triennial report for the Well Inspection and Maintenance Program of the Y- 12 Groundwater Protection Program (GWPP), at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12). This report formally documents well inspections completed by the GWPP on active and inactive wells at Y-12 during calendar years (CY) 2010 through 2012. In addition, this report also documents well inspections performed under the Y-12 Water Resources Restoration Program, which is administered by URS|CH2M Oak Ridge (UCOR). This report documents well maintenance activities completed since the last triennial inspection event (CY 2009); and provides summary tables of well inspections and well maintenance activities during the reference time period.

  4. Organizational Routines and Cognition: Introduction to the Special Issue on Routines

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    1 Organizational Routines and Cognition: Introduction to the Special Issue on Routines Nathalie of routines is considered central in methodological considerations of capabilities and organizational provides a finer grained analysis because organizational routines are not isolated units but are entangled

  5. Monitoring

    DOE Patents [OSTI]

    Orr, Christopher Henry (Calderbridge, GB); Luff, Craig Janson (Calderbridge, GB); Dockray, Thomas (Calderbridge, GB); Macarthur, Duncan Whittemore (Los Alamos, NM)

    2004-11-23T23:59:59.000Z

    The invention provides apparatus and methods which facilitate movement of an instrument relative to an item or location being monitored and/or the item or location relative to the instrument, whilst successfully excluding extraneous ions from the detection location. Thus, ions generated by emissions from the item or location can successfully be monitored during movement. The technique employs sealing to exclude such ions, for instance, through an electro-field which attracts and discharges the ions prior to their entering the detecting location and/or using a magnetic field configured to repel the ions away from the detecting location.

  6. Maintenance Guide for Microirrigation Systems in the

    E-Print Network [OSTI]

    Maintenance Guide for Microirrigation Systems in the Southern Region By The Irrigation Water-monitoring devices to evaluate cleaning 5. Remedial maintenance for micro-irrigation systems affected by scaling are technically more complex than overhead sprinkler or flood irrigation systems. They require significant

  7. Mining Surveillance and Maintenance Dollars

    SciTech Connect (OSTI)

    MARTINEZ, R.

    2000-02-01T23:59:59.000Z

    Accelerating site cleanup to reduce facility risks to the workers, the public and the environment during a time of declining federal budgets represents a significant technical and economic challenge to U.S. Department of Energy (DOE) Operations Offices and their respective contractors. A significant portion of a facility's recurring annual expenses are associated with routine, long-term surveillance and maintenance (S&M) activities. However, ongoing S&M activities do nothing to reduce risks and basically spend money that could be reallocated towards facility deactivation. This paper discusses the background around DOE efforts to reduce surveillance and maintenance costs, one approach used to perform cost reviews, lessons learned from field implementation and what assistance is available to assist DOE sites in performing these evaluations.

  8. Field Maintenance Manager

    Broader source: Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Rocky Mountain Region Maintenance, (J5100) Wyoming/Nebraska Maintenance Office...

  9. Autonomous monitoring of control hardware to predict off-normal conditions using NIF automatic Alignment Systems

    SciTech Connect (OSTI)

    Awwal, A; Wilhelmsen, K; Leach, R; Kamm, V M; Burkhart, S; Lowe-Webb, R; Cohen, S

    2011-07-20T23:59:59.000Z

    The National Ignition Facility (NIF) is a high power laser system capable of supporting high-energy-density experimentation as a user facility for the next 30 years. In order to maximize the facility availability, preventive maintenance enhancements are being introduced into the system. An example of such an enhancement is a camera-based health monitoring system, integrated into the automated alignment system, which provides an opportunity to monitor trends in measurements such as average beam intensity, size of the beam, and pixel saturation. The monitoring system will generate alerts based on observed trends in measurements to allow scheduled pro-active maintenance before routine off-normal detection stops system operations requiring unscheduled intervention.

  10. FAILURE DETECTION ROUTINE FOR GRID CONNECTED PV SYSTEMS AS PART OF THE PVSAT-2 PROJECT

    E-Print Network [OSTI]

    Heinemann, Detlev

    Dept. Of Electrical Engineering, University of Applied Science (FH) Magdeburg-Stendal. D-39114 failures, e.g. shading, string or module failure, part time outages, snow cover, soiling and wrong inverter, the maintenance effort of PV systems is reduced und system outage time is minimised. The Failure Detection Routine

  11. Associate Vice Chancellor Maintenance

    E-Print Network [OSTI]

    Hartman, Chris

    Equipment & Vehicle Maintenance Warehouse Vehicle Pool Shuttle Post Office Parking Services Contract

  12. Predictive Maintenance Technologies

    Broader source: Energy.gov [DOE]

    Several diagnostic technologies and best practices are available to assist Federal agencies with predictive maintenance programs.

  13. Substations reliability-centered maintenance and predictive maintenance - a strategic partnership

    SciTech Connect (OSTI)

    Colsher, R.J. [Electric Power Research Institute, Eddystone, PA (United States); Abbott, P.D.; Matusheski, R.L. [EPRI & MD Center, Eddystone, PA (United States); Smith, S.B. [ERIN Engineering & Research, Walnut Creek, CA (United States)

    1996-08-01T23:59:59.000Z

    A maintenance optimization study for substation components can be most effective when Reliability Centered Maintenance (RCM) Analysis is combined with a Predictive Maintenance (PDM) Assessment. If the two processes are performed concurrently, the benefit-to-cost ratios for each is increased. Also, the cost of implementing RCM recommendations for condition monitoring can be minimized, while maximizing their impact at the same time. This paper presents the essential elements of both the RCM and PDM processes, and describes how they work together in a substation environment as a comprehensive maintenance assessment tool. Descriptions of recent experiences are also included.

  14. Adult Routine Physical This health plan covers routine physical exams furnished by a General Hospital, Community

    E-Print Network [OSTI]

    Oppo, Delia W.

    covered related services). 1 #12;Pediatric Routine Physical This health plan covers routine pediatric careAdult Routine Physical This health plan covers routine physical exams furnished by a General Hospital, Community Health Center, Physician, Nurse Practitioner, Nurse Midwife or Independent Lab

  15. Transportation cask decontamination and maintenance at the potential Yucca Mountain repository; Yucca Mountain Site characterization project

    SciTech Connect (OSTI)

    Hartman, D.J.; Miller, D.D. [Bechtel National, Inc., San Francisco, CA (United States); Hill, R.R. [Sandia National Labs., Albuquerque, NM (United States)

    1992-04-01T23:59:59.000Z

    This study investigates spent fuel cask handling experience at existing nuclear facilities to determine appropriate cask decontamination and maintenance operations at the potential Yucca Mountain repository. These operations are categorized as either routine or nonroutine. Routine cask decontamination and maintenance tasks are performed in the cask preparation area at the repository. Casks are taken offline to a separate cask maintenance area for major nonroutine tasks. The study develops conceptual designs of the cask preparation area and cask maintenance area. The functions, layouts, and major features of these areas are also described.

  16. Estimation of Highway Maintenance Marginal Cost under Multiple Maintenance Activities

    E-Print Network [OSTI]

    Anani, Shadi B.; Madanat, Samer M

    2010-01-01T23:59:59.000Z

    Marginal costs for road maintenance and operation - a cost2010-01) Estimation of Highway Maintenance Marginal Costunder Multiple Maintenance Activities Shadi B. Anani and

  17. Predictive maintenance: Waterwall wastage

    SciTech Connect (OSTI)

    Rich, J.T.; Bilmanis, A. Jr.; Gandhi, R. [Potomac Electric Power Company, Washington, DC (United States)

    1996-07-01T23:59:59.000Z

    With the installation and use of burner systems to minimize NO, emissions, boiler waterwall wastage has become a more significant issue. This paper provides a description of an established inspection program to monitor waterwall wastage and other furnace issues that has now been developed into a predictive maintenance and condition-monitoring tool. This allows plant personnel to forecast the need for waterwall replacement activities and provides a basis for determining the effects of modifying boiler operating parameters affecting wastage. Potomac Electric Power Company (PEPCO), Washington, DC, has performed waterwall inspections of its boilers during planned overhauls for several years. These inspections consist of visual and ultrasonic thickness inspections of waterwall tubes at selected locations in the boiler. The ultrasonic thickness data collected is used to calculate current wastage rates, and to extrapolate tube wall thickness to the next planned outage. This information, along with the visual inspection data and panel replacement/repair history is used to select replacement and repair locations for the current outage, and to plan the replacement strategy for the next planned outage. A computer program has been developed to aid in the analysis of the data, and to provide plots of waterwall repair/replacement history as well as wall thickness and wastage rate information. The principal goals driving this program are to: (1) eliminate tube leaks between planned overhauls; (2) provide data to the outage managers for use in making replacement decisions; (3) determine wastage patterns; (4) forecast future replacement and repair needs; and (5) determine effect of changes to operating parameters on tube life. The waterwall condition monitoring program employed by PEPCO has proven to be successful in achieving its goals over the years. It must be emphasized that NDE is only one aspect of the program.

  18. Computerized Maintenance Management Systems

    Broader source: Energy.gov [DOE]

    Computerized maintenance management systems (CMMS) are a type of management software that perform functions in support of operations and maintenance (O&M) programs. The software automates most of the logistical functions performed by O&M staff.

  19. Optimizing Preventive Maintenance Models

    E-Print Network [OSTI]

    Optimizing Preventive Maintenance Models. Michael Bartholomew-Biggs. School of Physics Astronomy and Mathematics, University of Hertfordshire.

  20. Proactive maintenance initiatives at Argonne National Laboratory-West

    SciTech Connect (OSTI)

    Duckwitz, N.R.; Duncan, L.W.; Whipple, J.J.

    1995-06-01T23:59:59.000Z

    In the late 1980`s, ANL-W Management foresaw a need to provide dedicated technical support for maintenance supervisors. Maintenance supervisors were facing increased challenges to ensure all environmental, safety, and waste management regulations were followed in daily maintenance activities. This increased burden was diverting supervisory time away from on-the-job supervision. Supervisors were finding less time for their ``mentor`` roles to ensure maintenance focused on finding and correcting root causes. Additionally the traditional maintenance organization could not keep up with the explosion in predictive maintenance technologies. As a result, engineers were tasked to provide direct technical support to the maintenance organization. Today the maintenance technical support group consists of two mechanical engineers, two electrical engineers and an I&C engineer. The group provides a readily available, quick response resource for crafts people and their supervisors. They can and frequently do ask the support group for help to determine the root cause and to effect permanent fixes. Crafts and engineers work together informally to make an effective maintenance team. In addition to day-to-day problem solving, the technical support group has established several maintenance improvement programs for the site. This includes vibration analysis of rotating machinery, testing of fuel for emergency diesel generators, improving techniques for testing of high efficiency particulate air (HEPA) filters, and capacity testing of UPS and emergency diesel starting batteries. These programs have increased equipment reliability, reduced conventional routine maintenance, reduced unexpected maintenance, and improved testing accuracy. This paper will discuss the interaction of the technical support group within the maintenance department. Additionally the maintenance improvement programs will be presented along with actual cases encountered, the resolutions and lessons learned.

  1. Simnple, portable, 3-D projection routine

    SciTech Connect (OSTI)

    Wagner, J.S.

    1987-04-01T23:59:59.000Z

    A 3-D projection routine is presented for use in computer graphics applications. The routine is simple enough to be considered portable, and easily modified for special problems. There is often the need to draw three-dimensional objects on a two-dimensional plotting surface. For the object to appear realistic, perspective effects must be included that allow near objects to appear larger than distant objects. Several 3-D projection routines are commercially available, but they are proprietary, not portable, and not easily changed by the user. Most are restricted to surfaces that are functions of two variables. This makes them unsuitable for viewing physical objects such as accelerator prototypes or propagating beams. This report develops a very simple algorithm for 3-D projections; the core routine is only 39 FORTRAN lines long. It can be easily modified for special problems. Software dependent calls are confined to simple drivers that can be exchanged when different plotting software packages are used.

  2. Operation and Maintenance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations and Maintenance Operations OASIS: WALC-DSW (Note: this site is not hosted by Western and requires a digital certificate and login for full access.) Contact Information...

  3. Centralized maintenance procedures

    SciTech Connect (OSTI)

    Barber, J.R.

    1994-02-01T23:59:59.000Z

    In 1989, shortly after Westinghouse Hanford Company (WHC) assumed maintenance responsibilities for the Hanford site, a Department of Energy (DOE) maintenance audit found that field (working level) maintenance procedures and procedure practices of the facilities scattered across Hanford`s 560 square miles varied as greatly as the locations of those facilities. In some of the audited facilities there were few or no procedures; in others, procedures conflicted with or were redundant to procedures at other facilities. This document presents current efforts to centralize maintenance procedures.

  4. HVAC Maintenance and Technologies

    Broader source: Energy.gov [DOE]

    Presentation covers the HVAC maintenance and technologies, and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Providence, Rhode Island.

  5. Annual summary report of the Decontamination and Decommissioning Surveillance and Maintenance Program at Oak Ridge National Laboratory for period ending September 30, 1994

    SciTech Connect (OSTI)

    Anderson, L.A. [comp.; Burwinkle, T.W.; Ford, M.K.; Gaddis, H.R.; Holder, L. Jr.; Mandry, G.J.; Nelson, T.R.; Patton, B.D.

    1995-03-01T23:59:59.000Z

    The Surplus Facilities Management Program (SFMP) was established at Oak Ridge National Laboratory (ORNL) in 1976 to provide collective management of all surplus sites under ORNL`s control on the Oak Ridge Reservation. Presently, over 50 facilities, grouped into projects, are currently managed by the Decontamination and Decommissioning Program, the successor program to the SFMP. Support includes (1) surveillance and maintenance planning; (2) routine surveillance and maintenance; and (3) special maintenance projects. This report documents routine surveillance and maintenance, special projects, and special maintenance performed on these facilities for the period of October 1993 through September 1994.

  6. Run-Time Library Routines Reference

    E-Print Network [OSTI]

    California at San Diego, University of

    MDS Run-Time Library Routines Reference Manual February 1993 Software Version: MDS 5.2 VAX.S.A. The following are trademarks of Digitial Equipment Corporation: CDD DECnet VAX DATATRIEVE DECUS VAXcluster DEC MicroVAX VAX Information Architecture DEC/CMS MicroVMS VMS DEC/MMS Rdb/VMS VT IDL (Interactive Data

  7. Operations and Maintenance Program Structure

    Broader source: Energy.gov [DOE]

    The Federal Energy Management Program recommends Federal operations and maintenance (O&M) programs comprise of five distinct functions: operations, maintenance, engineering, training, and...

  8. EA-1982: Parker-Davis Transmission System Routine Operation and Maintenance

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy China U.S.ContaminationJuly 2011DDelphiFEA-2013.pdfBasedTheCounty, Idaho |

  9. Master schedule for CY-1983 Hanford environmental surveillance routine sampling program

    SciTech Connect (OSTI)

    Blumer, P.J.; Sula, M.J.; Eddy, P.A.; Dirkes, R.L.

    1982-12-01T23:59:59.000Z

    The current schedule of data collection for the routine Hanford environmental surveillance and ground-water monitoring programs at the Hanford Site is presented. The purpose of the programs is to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs. Radiological monitoring data are reported for air (particulate filter and gases/vapor), Columbia River water, sanitary water, onsite pond water, foodstuffs (whole milk, leafy vegetables, fruit, wheat/alfalfa, beef, poultry/eggs), wildlife, soil and vegetation, and direct radiation. Information is also given for on site radiation control audit surveys (roadway, railway, aerial, and waste disposal sites, and the Hanford ground-water monitoring program.

  10. A formal ontology for industrial maintenance

    E-Print Network [OSTI]

    Boyer, Edmond

    strategies (preventive maintenance, predictive maintenance, corrective maintenance), to managing operators1 A formal ontology for industrial maintenance Authors: 1- Dr. Mohamed Hedi KARRAY, LGP The rapid advancement of information and communication technologies has resulted in a variety of maintenance

  11. Quality Assurance Project Plan for the Environmental Monitoring Program in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1993-12-01T23:59:59.000Z

    Waste Area Grouping (WAG) 6 is a hazardous and low-level radioactive waste disposal site at Oak Ridge National Laboratory (ORNL). Extensive site investigations have revealed contaminated surface water, sediments, groundwater, and soils. Based on the results of the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) conducted from 1989--1991 and on recent interactions with the US Environmental Protection Agency (EPA) and the Tennessee Department of Environment and Conservation (TDEC), a decision was made to defer implementing source control remedial measures at the WAG. The information shows WAG 6 contributes < 2% of the total off-site contaminant risk released over White Oak Dam (WOD). The alternative selected to address hazards at WAG 6 involves maintenance of site access controls to prevent public exposure to on-site contaminants, continued monitoring of contaminant releases to determine if source control measures will be required in the future, and development of technologies to support final remediation of WAG 6. This Quality Assurance Project Plan (QAPjP) has been developed as part of the Environmental Monitoring Plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee (DOE/OR/01-1192&D1). Environmental monitoring will be conducted in two phases: the baseline monitoring phase and the routine annual monitoring phase. The baseline monitoring phase will be conducted to establish the baseline contaminant release conditions at the Waste Area Grouping (WAG), to confirm the site-related chemicals of concern (COC), and to gather data to confirm the site hydrologic model. The baseline monitoring phase is expected to begin in 1994 and continue for 12-18 months. The routine annual monitoring phase will consist of continued sampling and analyses of COC to determine off-WAG contaminant flux, to identify trends in releases, and to confirm the COC. The routine annual monitoring phase will continue for {approximately}4 years.

  12. Operation and Maintenance

    E-Print Network [OSTI]

    van Hemmen, J. Leo

    in this Publication is provided as is and has been prepared solely for the purpose of evaluating data center designOperation and Maintenance InRow® RD Air Cooled ACRD100 ACRD101 #12;This manual is available assumes no liability for damages, violations of codes, improper installation, system failures, or any

  13. CH Packaging Maintenance Manual

    SciTech Connect (OSTI)

    Washington TRU Solutions

    2002-01-02T23:59:59.000Z

    This procedure provides instructions for performing inner containment vessel (ICV) and outer containment vessel (OCV) maintenance and periodic leakage rate testing on the following packaging seals and corresponding seal surfaces using a nondestructive helium (He) leak test. In addition, this procedure provides instructions for performing ICV and OCV structural pressure tests.

  14. annual routines behaviour: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and (viii) a possible definition of 'routine'. An m extended appendix by Massimo Egidi provides a lexicon of synonyms and opposites ji covering use of the word 'routine ' in...

  15. antigen amount routinely: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and (viii) a possible definition of 'routine'. An m extended appendix by Massimo Egidi provides a lexicon of synonyms and opposites ji covering use of the word 'routine ' in...

  16. RESEARCH Open Access Impact of routine percutaneous coronary

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    RESEARCH Open Access Impact of routine percutaneous coronary intervention after out Introduction: Since 2003, we have routinely used percutaneous coronary intervention (PCI) and mild therapeutic angiography associated with percuta- neous coronary intervention (PCI) has been recommended in the presence

  17. PORTFOLIO OF POTENTIAL STRATEGIES IN AERONAUTIC MAINTENANCE

    SciTech Connect (OSTI)

    Rolet, S. [Structural Health Engineering department, EADS Innovation Works, Toulouse (France)

    2010-02-22T23:59:59.000Z

    EADS divisions aim more and more at developing services associated to their platforms. EADS divisions, like Airbus and Eurocopter, are investigating on services associated to their platforms in order to add them value. One possible service consists in structural maintenance operation assistance, especially for NDT operations performed by the customer. EADS Innovation Works envisages three different and complementary enhanced structural maintenance categories. Enhanced NDT improves standard NDT operation environment. This is made possible by the existence of 'smart' NDT tools that are computer based and therefore able to support other functions. These functions range from local smart data processing and display to remote expert assisted operation. Passive Sensor Network relies on sensors permanently installed on aircraft structure. Interrogation of sensors is performed on ground and off line (while structure is not loaded except by its own weight). It can be done at arbitrary times in order to determine structure health. The aim is to give easy access to some hidden ''hot spots,'' to reduce human factor in structure health assessment and optimize maintenance. Structural Health Monitoring goes a step beyond Passive Sensor Network, because interrogation units are on board the aircraft and may be connected to aircraft network. It allows to use on-line techniques such as adapted acoustic emission and to automatically raise an alarm when a defect appears in the structure. This paper presents these different ways of improving structural maintenance operations in service, with their respective advantages and limitations.

  18. Organizational Routines as a Source of Continuous Change

    E-Print Network [OSTI]

    Feldman, Martha S

    2000-01-01T23:59:59.000Z

    Giovanni Dosi, Massimo Egidi, Luigi Marengo, Massimoof routine as indicated by Egidi in the paper that resulted

  19. Robust Maintenance Policies in Asset Management

    E-Print Network [OSTI]

    Kuhn, Kenneth D.; Madanat, Samer M.

    2005-01-01T23:59:59.000Z

    Madanat, S. , ‘Optimal Maintenance and Repair Policies inROBUST MAINTENANCE POLICIES IN ASSET MANAGEMENT Kenneth D.approach may reduce maintenance and rehabilitation (M&R)

  20. Major NERSC Maintenance Tuesday November 11

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Major NERSC Maintenance Tuesday November 11 Major NERSC Maintenance Tuesday November 11 October 31, 2014 by Francesca Verdier (0 Comments) There will be a major NERSC maintenance...

  1. Operations and Maintenance Best Practices Guide | Department...

    Broader source: Energy.gov (indexed) [DOE]

    of Maintenance Programs Chapter 6: Predictive Maintenance Technologies Chapter 7: Commissioning Existing Buildings Chapter 8: Metering for Operations and Maintenance Chapter 9:...

  2. Proposed SOLCOST maintenance activities

    SciTech Connect (OSTI)

    none,

    1980-01-01T23:59:59.000Z

    This document provides a short description of work that has been accomplished to date and work in progress. A discussion of the program status as it is currently configured follows and finally proposed work by Solar Environmental Engineering Company (SEEC) in its most recently signed contract with the Department of Energy (DOE) is given. Early statements are designed to give the reader a good background so that the suggested SOLCOST maintenance activities will be more easily understood.

  3. Nitrous Oxide Systems Maintenance in Clinical Areas

    E-Print Network [OSTI]

    Jia, Songtao

    . It specifically speaks to maintenance of nitrous oxide delivery systems, preventive maintenance for house. Arrange with Facilities for regular preventive maintenance and annual performance check of ventilation). b. Provides preventive maintenance on ventilation system as necessary. c. Coordinates annual

  4. Scheduling with Fixed Maintenance, Shared Resources and ...

    E-Print Network [OSTI]

    2015-02-07T23:59:59.000Z

    Nov 17, 2014 ... maintenance constraints, blending and shared resources. ...... tegrated fixed time interval preventive maintenance and production for schedul-.

  5. Africa's Transport Infrastructure Mainstreaming Maintenance and...

    Open Energy Info (EERE)

    Mainstreaming Maintenance and Management Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Africa's Transport Infrastructure Mainstreaming Maintenance and Management...

  6. Scheduling Flexible Maintenance Activities subject to Job ...

    E-Print Network [OSTI]

    2010-04-14T23:59:59.000Z

    Apr 3, 2010 ... models by allowing a flexible maintenance schedule. Specifically, under restrictions determined by the respective setting, maintenance ...

  7. Wind energy, with an annual growth of about 30%, represents one of the fastest growing renewable energy sources. Continuous long-term monitoring of wind turbines can greatly reduce maintenance

    E-Print Network [OSTI]

    Stanford University

    Abstract Wind energy, with an annual growth of about 30%, represents one of the fastest growing Monitoring, Wind Turbines 1 Introduction Wind energy, considered to be safe, inexpensive and clean, is one of the fastest growing renewable energy resources (Bloomberg, 2011). According to the World Wind Energy

  8. Lawn Maintenance Safety

    E-Print Network [OSTI]

    Smith, David

    2005-07-12T23:59:59.000Z

    debris and noise. ? Allow the engine to cool before returning it to a storage shed. ? Turn the power off and disconnect the spark plug wire before cleaning, inspecting, adjusting or repairing the cutting blade. Lawn Maintenance Safety ? Don?t run a... as possible to avoid being hit by passing vehicles. ? Never leave an electric- or gas-powered edger plugged in or running while unattended. ? Unplug or turn off an electric or gas-powered edger before inspecting, cleaning, adjusting or replacing the blade...

  9. Operation and Maintenance Manual for the Central Facilities Area Sewage Treatment Plant

    SciTech Connect (OSTI)

    Norm Stanley

    2011-02-01T23:59:59.000Z

    This Operation and Maintenance Manual lists operator and management responsibilities, permit standards, general operating procedures, maintenance requirements and monitoring methods for the Sewage Treatment Plant at the Central Facilities Area at the Idaho National Laboratory. The manual is required by the Municipal Wastewater Reuse Permit (LA-000141-03) the sewage treatment plant.

  10. Risk-based maintenance modeling. Prioritization of maintenance importances and quantification of maintenance effectiveness

    SciTech Connect (OSTI)

    Vesely, W.E.; Rezos, J.T. [Science Applications International Corp., Dublin, OH (United States)

    1995-09-01T23:59:59.000Z

    This report describes methods for prioritizing the risk importances of maintenances using a Probabilistic Risk Assessment (PRA). Approaches then are described for quantifying their reliability and risk effects. Two different PRA importance measures, minimal cutset importances and risk reduction importances, were used to prioritize maintenances; the findings show that both give similar results if appropriate criteria are used. The justifications for the particular importance measures also are developed. The methods developed to quantify the reliability and risk effects of maintenance actions are extensions of the usual reliability models now used in PRAs. These extended models consider degraded states of the component, and quantify the benefits of maintenance in correcting degradations and preventing failures. The negative effects of maintenance, including downtimes, also are included. These models are specific types of Markov models. The data for these models can be obtained from plant maintenance logs and from the Nuclear Plant Reliability Data System (NPRDS). To explore the potential usefulness of these models, the authors analyzed a range of postulated values of input data. These models were used to examine maintenance effects on a components reliability and performance for various maintenance programs and component data. Maintenance schedules were analyzed to optimize the component`s availability. In specific cases, the effects of maintenance were found to be large.

  11. Development of a maintenance program

    SciTech Connect (OSTI)

    Walker, I.

    1987-01-01T23:59:59.000Z

    Bruce Nuclear Generating Station (NGS) A in Tiverton, Ontario, has been operating for 10 yr. One reason for its successful operating record is the development of an effective preventive maintenance program. Evaluation of the existing preventive program included a review of maintenance of selected key equipment over the life of the station. The review emphasized the need to improve the storage and sorting of maintenance information for trend and cost analysis, manpower planning, reliability, and radiation dose calculations.

  12. A framework for non-intrusive load monitoring and diagnostics

    E-Print Network [OSTI]

    Paris, James, Ph. D. Massachusetts Institute of Technology

    2006-01-01T23:59:59.000Z

    The widespread use of electrical and electromechanical systems places increasing demands on monitoring and diagnostic techniques. The non-intrusive load monitor (NILM) provides a low-cost, low-maintenance way to perform ...

  13. Sustainability of green space maintenance

    E-Print Network [OSTI]

    Nomura, Wataru

    2011-01-01T23:59:59.000Z

    In Japan, recent changes in socio-economic and political structures -- decreasing tax revenue, declining communication among community members, and privatization of public services-- have influenced existing maintenance ...

  14. Operations and Maintenance Program Implementation

    Broader source: Energy.gov [DOE]

    Implementing an effective operations and maintenance (O&M) program requires patience and persistence. This is especially true since no universal plan fits all Federal agencies.

  15. Asphalt, Concrete, and Turf Maintenance and Preservation

    E-Print Network [OSTI]

    Minnesota, University of

    preventive maintenance, pavement distress and identification, and best practices for the maintenance Consultant WSB and Associates, Inc. 763-287-7184 jstewart@wsbeng.com #12;2 Preventive Maintenance Preventive maintenance and minor rehab, and is often used to repair environmental damage. Preventive maintenance narrows

  16. The International Coal Statistics Data Base program maintenance guide

    SciTech Connect (OSTI)

    Not Available

    1991-06-01T23:59:59.000Z

    The International Coal Statistics Data Base (ICSD) is a microcomputer-based system which contains information related to international coal trade. This includes coal production, consumption, imports and exports information. The ICSD is a secondary data base, meaning that information contained therein is derived entirely from other primary sources. It uses dBase III+ and Lotus 1-2-3 to locate, report and display data. The system is used for analysis in preparing the Annual Prospects for World Coal Trade (DOE/EIA-0363) publication. The ICSD system is menu driven and also permits the user who is familiar with dBase and Lotus operations to leave the menu structure to perform independent queries. Documentation for the ICSD consists of three manuals -- the User's Guide, the Operations Manual, and the Program Maintenance Manual. This Program Maintenance Manual provides the information necessary to maintain and update the ICSD system. Two major types of program maintenance documentation are presented in this manual. The first is the source code for the dBase III+ routines and related non-dBase programs used in operating the ICSD. The second is listings of the major component database field structures. A third important consideration for dBase programming, the structure of index files, is presented in the listing of source code for the index maintenance program. 1 fig.

  17. Optimal scheduling of fighter aircraft maintenance

    E-Print Network [OSTI]

    Cho, Philip Y

    2011-01-01T23:59:59.000Z

    The effective scheduling of fighter aircraft maintenance in the Air Force is crucial to overall mission accomplishment. An effective maintenance scheduling policy maximizes the use of maintenance resources and aircraft ...

  18. Data Polling Routine (PlotHood) to Generate Weekly Inspection Plots for Fort Hood, Texas

    E-Print Network [OSTI]

    Saman, N. F.; Reddy, T. A.; Haberl, J. S.; Claridge, D. E.; Turner, W. D.

    1996-01-01T23:59:59.000Z

    . For this part of the project, a weather station that includes temperature, humidity and solar sensors was installed at the west substation of Ft. Hood as part of Phase I of this project. Weekly inspection plots of electricity use at the main substation of Ft...-Phase II, p. ii TABLE OF CONTENTS General Abstract i Disclaimer iii Acknowledgments iv Provide Data Polling and Inspection Plots Generation Routine (PlotHood) Executive Summary 2 Existing Monitoring System 3 a- ESL Weather Station at the West Substation. 3...

  19. Optimizing Installation, Operation, and Maintenance at Offshore...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in the United States Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in...

  20. Operations and Maintenance Program Management

    Broader source: Energy.gov [DOE]

    Effective management is critical to any operations and maintenance (O&M) program. The management function should bind the distinct parts of the O&M program into a cohesive entity.

  1. Operations and Maintenance Management Support

    Broader source: Energy.gov [DOE]

    Federal operations and maintenance (O&M) programs must gain full support from management to succeed. Management understanding and buying into the program elevates O&M importance and allows...

  2. Genetic variation and its maintenance

    SciTech Connect (OSTI)

    Roberts, D.F.; De Stefano, G.F.

    1986-01-01T23:59:59.000Z

    This book contains several papers divided among three sections. The section titles are: Genetic Diversity--Its Dimensions; Genetic Diversity--Its Origin and Maintenance; and Genetic Diversity--Applications and Problems of Complex Characters.

  3. Maintenance Practices for LED Streetlights

    Broader source: Energy.gov [DOE]

    This April 14, 2014 webinar answered important questions about the maintenance and reliability of LED streetlights, and how to take these issues into account when planning and preparing for a...

  4. Effects of family routines and family stress on child competencies

    E-Print Network [OSTI]

    Hill, Crystal Renee

    2006-10-30T23:59:59.000Z

    The current study had two purposes. The first purpose was to examine the association between family rules and routines and first grade children's teacher-rated and peer-rated behavioral competencies (e.g., emotional symptoms, conduct problems, peer...

  5. Business Development - Predictive Maintenance Products

    E-Print Network [OSTI]

    Sceiczina, P.

    2005-01-01T23:59:59.000Z

    BUSINESS DEVELOPMENT - PREDICTIVE MAINTENANCE PRODUCTS Phillip Sceiczina, ifm efector, inc. In this time of global competitiveness, more companies are focusing on reducing manufacturing costs to increase profits. Energy costs can be a... significant portion of a company?s manufacturing costs. Compressed air leakage is often an overlooked area in predictive maintenance programs, however it greatly impacts the amount of electricity required to run a plant. This paper quantifies the cost...

  6. Turfgrass: Maintenance Costs in Texas.

    E-Print Network [OSTI]

    Holt, Ethan C.; Allen, W. Wayne; Ferguson, Marvin H.

    1964-01-01T23:59:59.000Z

    . These regions also have high water costs. The Gulf Coast, where water is a minor item, has an average expenditure only slightly greater than half that in West Texas. Average lawn sizes in these two regions are almost identical. Use of com- post, commercial.... Individuals with grasses other than bermuda and St. Augustine spend on the average about 53 percent TARLE 2. TOTALS OF VARIOUS HOME LAWN MAINTENANCE EXPENDITURES WITHIN REGIONS AND FOR THE STATE1 Number of Maintenance items Region households Commercial...

  7. Operating Experience Review of Tritium-in-Water Monitors

    SciTech Connect (OSTI)

    S. A. Bruyere; L. C. Cadwallader

    2011-09-01T23:59:59.000Z

    Monitoring tritium facility and fusion experiment effluent streams is an environmental safety requirement. This paper presents data on the operating experience of a solid scintillant monitor for tritium in effluent water. Operating experiences were used to calculate an average monitor failure rate of 4E-05/hour for failure to function. Maintenance experiences were examined to find the active repair time for this type of monitor, which varied from 22 minutes for filter replacement to 11 days of downtime while waiting for spare parts to arrive on site. These data support planning for monitor use; the number of monitors needed, allocating technician time for maintenance, inventories of spare parts, and other issues.

  8. A cask maintenance facility feasibility study

    SciTech Connect (OSTI)

    Rennich, M.J.; Medley, L.G.; Attaway, C.R.

    1989-01-01T23:59:59.000Z

    The Oak Ridge National Laboratory (ORNL) is developing a transportation system for spent nuclear fuel (SNF) and defense high level waste (HLW) as a part of the Federal Waste Management System (FWMS). In early 1988, a feasibility study was undertaken to design a stand-alone, ''green field'' facility for maintaining the FWMS casks. The feasibility study provided an initial layout facility design, an estimate of the construction cost, and an acquisition schedule for a Cask Maintenance Facility (CMF). The study also helped to define the interfaces between the transportation system and the waste generators, the repository, and a Monitored Retrievable Storage (MRS) facility. The data, design, and estimated costs resulting from the study have been organized for use in the total transportation system decision-making process. Most importantly, the feasibility study also provides a foundation for continuing design and planning efforts. Fleet servicing facility studies, operational studies from current cask system operators, a definition of the CMF system requirements, and the experience of others in the radioactive waste transportation field were used as a basis for the feasibility study. In addition, several cask handling facilities were visited to observe and discuss cask operations to establish the functions and methods of cask maintenance expected to be used in the facility. Finally, a peer review meeting was held at Oak Ridge, Tennessee in August, 1988, in which the assumptions, design, layout, and functions of the CMF were significantly refined. Attendees included representatives from industry, the repository and transportation operations.

  9. A Proposal for Autotuning Linear AlgebraA Proposal for Autotuning Linear Algebra Routines on Multicore PlatformsRoutines on Multicore Platforms

    E-Print Network [OSTI]

    Giménez, Domingo

    on Multicore PlatformsRoutines on Multicore Platforms Javier Cuenca, Luis P. García Domingo Giménez Parallel Algebra Routines on Multicore PlatformsPlatforms 22 parallelparallelumum Introduction Algebra Routines on MulticoreA Proposal for Autotuning Linear Algebra Routines on Multicore PlatformsPlatforms

  10. Module 10: Maintenance and Fueling Guidelines

    Broader source: Energy.gov [DOE]

    This course covers safety guidelines for hydrogen, safe maintenance facilities, safety guidelines for hydrogen fueling facilities

  11. Dynamic Scheduling of Maintenance Activities Under Uncertainties

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    of the required treatment. There are mainly two types of maintenance activities: the preventive maintenance, whoseDynamic Scheduling of Maintenance Activities Under Uncertainties Fran¸cois Marmier, Christophe in maintenance services field where the different practical knowledges or skills are their working tools. We

  12. Operations and Maintenance Manual for Large Aperture Scanner System

    SciTech Connect (OSTI)

    Jones, Anthony M.; Hall, Thomas E.

    2010-04-08T23:59:59.000Z

    Operations and maintenance manual includes detailed instructions for system assembly, use, and maintenance.

  13. Applications guide to pedestrian SNM monitors

    SciTech Connect (OSTI)

    Fehlau, P.E.

    1986-02-01T23:59:59.000Z

    The applications guide introduces readers to the pedestrian special nuclear material (SNM) monitors that provide nuclear material control at DOE contractor facilities. It explains the principles of operation, the strong and weak points, and steps for calibration and maintenance of the monitors. Administrators and security specialists will find an overview of pedestrain monitor application and upkeep in Part 1 of the guide and a descriptive catalog of present-day monitors in Part 3. Technically oriented readers will be interested in the more detailed discussion of SNM monitoring physics and SNM monitor design principles found in Part 2. 18 refs., 33 figs., 9 tabs.

  14. Opportune maintenance and predictive maintenance decision support douard Thomas, ric Levrat, Benoit Iung, Pierre Cocheteux

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    : When to perform a particular maintenance action? What components should benefit from a preventive maintenance action? Which components should first benefit from a preventive maintenance interventionOpportune maintenance and predictive maintenance decision support Ã?douard Thomas, Ã?ric Levrat

  15. Airline Fleet Maintenance: Trade-off Analysis of Alternate Aircraft Maintenance Approaches

    E-Print Network [OSTI]

    -based. The preventative alternative involves the transmission of maintenance data to maintenance personnel whenAirline Fleet Maintenance: Trade-off Analysis of Alternate Aircraft Maintenance Approaches Mike Dupuy, Dan Wesely, Cody Jenkins Abstract ­ Airline maintenance is a significant contributor

  16. TMV Technology Capabilities Brake Stroke Monitor

    E-Print Network [OSTI]

    TMV Technology Capabilities Brake Stroke Monitor Brake monitoring systems are proactive maintenance This technology allows for CMV operators to have knowledge of their steer, drive, and tandem axle group weights setup is required. Current Safety/Enforcement Technologies EOBR (electronic on-board recorder) On

  17. Iron production maintenance effectiveness system

    SciTech Connect (OSTI)

    Augstman, J.J. [Dofasco Inc., Hamilton, Ontario (Canada)

    1996-12-31T23:59:59.000Z

    In 1989, an internal study in the Coke and Iron Maintenance Department identified the opportunities available to increase production, by decreasing unscheduled maintenance delays from 4.6%. A five year front loaded plan was developed, and presented to the company president. The plan required an initial investment of $1.4 million and a conservative break-even point was calculated to be 2.5 years. Due to budget restraints, it would have to be self-funded, i.e., generate additional production or savings, to pay for the program. The program began in 1991 at number 2 coke plant and the blast furnaces. This paper will describe the Iron Production Maintenance Effectiveness System (ME), which began with the mechanical and pipefitting trades.

  18. Managing aging in nuclear power plants: Insights from NRC maintenance team inspection reports

    SciTech Connect (OSTI)

    Fresco, A.; Subudhi, M.; Gunther, W.; Grove, E.; Taylor, J. [Brookhaven National Lab., Upton, NY (United States)

    1993-12-01T23:59:59.000Z

    A plant`s maintenance program is the principal vehicle through which age-related degradation is managed. From 1988 to 1991, the NRC evaluated the maintenance program of every nuclear power plant in the United States. Forty-four out of a total of 67 of the reports issued on these in-depth team inspections were reviewed for insights into the strengths and weaknesses of the programs as related to the need to understand and manage the effects of aging on nuclear plant systems, structures, and components. Relevant information was extracted from these inspection reports and sorted into several categories, including Specific Aging Insights, Preventive Maintenance, Predictive Maintenance and Condition Monitoring, Post Maintenance Testing, Failure Trending, Root Cause Analysis and Usage of Probabilistic Risk Assessment in the Maintenance Process. Specific examples of inspection and monitoring techniques successfully used by utilities to detect degradation due to aging have been identified. The information also was sorted according to systems and components, including: Auxiliary Feedwater, Main Feedwater, High Pressure Injection for both BWRs and PWRs, Service Water, Instrument Air, and Emergency Diesel Generator Air Start Systems, and Emergency Diesel Generators Air Start Systems, emergency diesel generators, electrical components such as switchgear, breakers, relays, and motor control centers, motor operated valves and check valves. This information was compared to insights gained from the Nuclear Plant Aging Research (NPAR) Program. Attributes of plant maintenance programs where the NRC inspectors felt that improvement was needed to properly address the aging issue also are discussed.

  19. Maintenance FUSION IGNITION RESEARCH EXPERIMENT

    E-Print Network [OSTI]

    Insulation Enclosure Remote Maintenance Module FUSION IGNITION RESEARCH EXPERIMENT SYSTEM coils. The magnets are liquid nitrogen cooled and the entire device is surrounded by a thermal enclosure. The double wall vacuum vessel integrates cooling and shielding in a shape that maximizes shielding of ex

  20. Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM)

    Broader source: Energy.gov [DOE]

    Overall direction for surveillance and maintenance of excess facilities is addressed in DOE G 430.1-2, IMPLEMENTATION GUIDE FOR SURVEILLANCE AND MAINTENANCE DURING FACILITY TRANSITION AND...

  1. Improving shipboard maintenance practices using non-intrusive load monitoring

    E-Print Network [OSTI]

    Piber, Mark A. (Mark Augustin)

    2007-01-01T23:59:59.000Z

    (cont.) New casualty parameters were recorded and analyzed in an attempt to verify and expand on diagnostic software currently being developed for the vacuum aided sewage collection system. The analysis of the ships service ...

  2. Ultra-low-power electronics for non-invasive medical monitoring

    E-Print Network [OSTI]

    Turicchia, Lorenzo

    New electronics for non-invasive medical monitoring promise low-cost, maintenance-free, and lightweight devices. These devices are critical in long-term medical measurements and in home-based tele-monitoring services, which ...

  3. Improving maintenance operation through transformational outsourcing

    E-Print Network [OSTI]

    Ye, Jacqueline Ming-Shih

    2007-01-01T23:59:59.000Z

    Outsourcing maintenance to third-party contractors has become an increasingly popular option for manufacturers to achieve tactical and/or strategic objectives. Though simple in concept, maintenance outsourcing is difficult ...

  4. Maintenance cost studies of present aircraft subsystems

    E-Print Network [OSTI]

    Pearlman, Chaim Herman Shalom

    1966-01-01T23:59:59.000Z

    This report describes two detailed studies of actual maintenance costs for present transport aircraft. The first part describes maintenance costs for jet transport aircraft broken down into subsystem costs according to an ...

  5. Information Technology for Energy and Maintenance Management 

    E-Print Network [OSTI]

    Villafana, L.; Federspiel, C.

    2003-01-01T23:59:59.000Z

    and control systems (EMCS) to recommend what maintenance personnel should do in response to a maintenance service request. MORE integrates text descriptions of problems with sensor information related to the problem. After work orders are closed, MORE uses...

  6. Information Technology for Energy and Maintenance Management

    E-Print Network [OSTI]

    Villafana, L.; Federspiel, C.

    2003-01-01T23:59:59.000Z

    and control systems (EMCS) to recommend what maintenance personnel should do in response to a maintenance service request. MORE integrates text descriptions of problems with sensor information related to the problem. After work orders are closed, MORE uses...

  7. Scalable Coverage Maintenance for Dense Wireless Sensor Networks

    E-Print Network [OSTI]

    Lu, Jun; Wang, Jinsu; Suda, Tatsuya

    2007-01-01T23:59:59.000Z

    an ef- ficient coverage maintenance protocol for distributedArticle Scalable Coverage Maintenance for Dense Wirelessbattery energy. Coverage maintenance schemes can e?ectively

  8. Adolescents' Maintenance of Family Connectedness in Their Everyday Lives

    E-Print Network [OSTI]

    Tsai, Kim M

    2014-01-01T23:59:59.000Z

    may challenge adolescents’ maintenance of leisure time withLos Angeles Adolescents’ Maintenance of Family ConnectednessAdolescents’ Maintenance of Family Connectedness in Their

  9. Mechanisms Regulating Specification and Maintenance of Pancreatic Cell Fate

    E-Print Network [OSTI]

    Kanji, Murtaza Shabbir

    2013-01-01T23:59:59.000Z

    et al. , SOX9 is required for maintenance of the pancreaticstem cells for tissue maintenance? Cell Cycle, 2004. 3(9):cell specification and maintenance. ” Larry Hillblom Islet

  10. Dialect Contact, Convergence, and Maintenance in Oregon Athabaskan

    E-Print Network [OSTI]

    Spence, Justin

    2013-01-01T23:59:59.000Z

    Contact, Convergence, and Maintenance in Oregon AthabaskanContact, Convergence, and Maintenance in Oregon Athabaskan Jcases of dialect maintenance presented in §5 show that not

  11. USE OF EMBEDDED MICROCOMPUTERS IN SYSTEM DEBUGGING AND MAINTENANCE

    E-Print Network [OSTI]

    Meng, John

    2014-01-01T23:59:59.000Z

    IN SYSTEM DEBUGGING AND MAINTENANCE John Meng and Dan WeaverIN SYSTEM DEBUGGING AND MAINTENANCE John Meng and Dan Weaverflexible debugging and maintenance devices by switching in

  12. Robust Maintenance Policies for Markovian Systems under Model Uncertainty

    E-Print Network [OSTI]

    Kuhn, Kenneth D.; Madanat, Samer M.

    2005-01-01T23:59:59.000Z

    Robust Maintenance Policies for Markovian Systems underWu, M.I. (1987), Optimal maintenance decisions for pavementapproach may reduce maintenance and rehabilitation (M&R)

  13. Regeneration and Maintenance of Intestinal Smooth Muscle Phenotypes.

    E-Print Network [OSTI]

    Walthers, Christopher

    2014-01-01T23:59:59.000Z

    smooth muscle cell maintenance by basic fibroblast growthsmooth muscle cell maintenance by basic fibroblast growthsmooth muscle cell maintenance by basic fibroblast growth

  14. Robust maintenance policies for Markovian systems under model uncertainty

    E-Print Network [OSTI]

    Kuhn, K D; Madanat, S M

    2006-01-01T23:59:59.000Z

    Robust Maintenance Policies for Markovian Systems underWu, M.I. (1987), Optimal maintenance decisions for pavementapproach may reduce maintenance and rehabilitation (M&R)

  15. Operations & Maintenance Best Practices Guide: Chapter 11

    Broader source: Energy.gov [DOE]

    Guide describes chapter 11 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  16. Operations & Maintenance Best Practices Guide: Appendix d

    Broader source: Energy.gov [DOE]

    Guide describes Appendix D of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  17. Operations & Maintenance Best Practices Guide: Appendix B

    Broader source: Energy.gov [DOE]

    Guide describes Appendix B of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  18. Operations & Maintenance Best Practices Guide: Chapter 10

    Broader source: Energy.gov [DOE]

    Guide describes chapter 10 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  19. Operations & Maintenance Best Practices Guide: Chapter 2

    Broader source: Energy.gov [DOE]

    Guide describes chapter 2 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  20. Operations & Maintenance Best Practices Guide: Appendix c

    Broader source: Energy.gov [DOE]

    Guide describes Appendix C of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  1. Operations & Maintenance Best Practices Guide: Chapter 6

    Broader source: Energy.gov [DOE]

    Guide describes chapter 6 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  2. Operations & Maintenance Best Practices Guide: Chapter 5

    Broader source: Energy.gov [DOE]

    Guide describes chapter 5 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  3. Operations & Maintenance Best Practices Guide: Front Matter

    Broader source: Energy.gov [DOE]

    Guide describes the front matter of the Operations and Maintenance Best Practices: a Guide to Achieving Operational Efficiency.

  4. Operations & Maintenance Best Practices Guide: Chapter 8

    Broader source: Energy.gov [DOE]

    Guide describes chapter 8 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  5. STANDARD OPERATING PROCEDURES Annual Site Maintenance

    E-Print Network [OSTI]

    Fischer, Emily V.

    IMPROVE STANDARD OPERATING PROCEDURES SOP 226 Annual Site Maintenance Date Last Modified Modified This standard operating procedure (SOP) describes the procedures for annual maintenance of equipment Sampler Operation Manual #12;SOP 226: Annual Site Maintenance 3 1.0 PURPOSE AND APPLICABILITY

  6. Maintenance and Prevention: Formalization and Fixpoint Characterization

    E-Print Network [OSTI]

    Maintenance and Prevention: Formalization and Fixpoint Characterization Munindar P. Singh Maintenance and prevention are important concepts in the science of intel­ ligent systems, yet serious research attention. Maintenance and prevention are duals of each other, but cannot be reduced

  7. ROBUSTNESS MEASURE FOR FUZZY MAINTENANCE ACTIVITIES SCHEDULE

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    activities: the preventive maintenance, whose activities can be long term planned, and the correctiveROBUSTNESS MEASURE FOR FUZZY MAINTENANCE ACTIVITIES SCHEDULE François MARMIER , Christophe VARNIER. Especially in the field of maintenance services where the different practical knowledge or skills

  8. Optimal Preventive Maintenance Scheduling in Semiconductor Manufacturing

    E-Print Network [OSTI]

    Marcus, Steven I.

    1 Optimal Preventive Maintenance Scheduling in Semiconductor Manufacturing Xiaodong Yao, Emmanuel on Control Applications in 2001. #12;2 Abstract Preventive Maintenance (PM) scheduling is a very challenging schedule with that of a baseline reference schedule are also presented. Index Terms preventive maintenance

  9. Prognostics for the Maintenance of Distributed Systems

    E-Print Network [OSTI]

    Pencolé, Yannick

    but also higher level function prognosis. I. INTRODUCTION In the classical case, preventive maintenance of preventive maintenance for complex systems. In this sense, a distributed system can be split down into a setPrognostics for the Maintenance of Distributed Systems Pauline Ribot, Yannick Pencol´e and Michel

  10. Preventative Maintenance (PM) Policy Outline the policy regarding preventative vehicle maintenance on University of Michigan (U-

    E-Print Network [OSTI]

    Kirschner, Denise

    Preventative Maintenance (PM) Policy Objective Outline the policy regarding preventative vehicle maintenance on University of Michigan (U- M) vehicles. Policy 1. All maintenance performed on U-M vehicles their own campus maintenance facility to repair their fleet vehicles. 2. To ensure proper stewardship of U

  11. Technology and application of structural health monitoring in bridges

    E-Print Network [OSTI]

    Meehan, Rachael E. (Rachael Elizabeth)

    2011-01-01T23:59:59.000Z

    Structural Health Monitoring (SHM) has become a useful tool for detecting when the characteristics of a structure have changed to indicate damage such that well-timed and effective maintenance may be planned and the remaining ...

  12. Cryogenic Neutron Protein Crystallography: routine methods and potential benefits

    SciTech Connect (OSTI)

    Weiss, Kevin L [ORNL; Tomanicek, Stephen J [ORNL; NG, Joseph D [ORNL

    2014-01-01T23:59:59.000Z

    The use of cryocooling in neutron diffraction has been hampered by several technical challenges such as the need for specialized equipment and techniques. Recently we have developed and deployed equipment and strategies that allow for routine neutron data collection on cryocooled crystals using off the shelf components. This system has several advantages, compared to a closed displex cooling system such as fast cooling coupled with easier crystal mounting and centering. The ability to routinely collect cryogenic neutron data for analysis will significantly broaden the range of scientific questions that can be examined by neutron protein crystallography. Cryogenic neutron data collection for macromolecules has recently become available at the new Biological Diffractometer BIODIFF at FRM II and the Macromolecular Diffractometer (MaNDi) at the Spallation Neutron Source, Oak Ridge National Laboratory. To evaluate the benefits of a cryocooled neutron structure we collected a full neutron data set on the BIODIFF instrument on a Toho-1 lactamase structure at 100K.

  13. Optimal Joint Preventive Maintenance and Production Policies* Xiaodong Yao

    E-Print Network [OSTI]

    Marcus, Steven I.

    Optimal Joint Preventive Maintenance and Production Policies* Xiaodong Yao SAS Institute Inc. Cary preventive maintenance (PM) and production policies for an unreliable production-inventory system in which to establish some additional structural properties. Keywords: optimal preventive maintenance, joint maintenance

  14. Pacific Northwest Laboratory Maintenance Implementation plan

    SciTech Connect (OSTI)

    Bright, J.D.

    1992-06-01T23:59:59.000Z

    This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory`s (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change {number_sign}3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services` current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

  15. Pacific Northwest Laboratory Maintenance Implementation plan

    SciTech Connect (OSTI)

    Bright, J.D.

    1992-06-01T23:59:59.000Z

    This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory's (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change {number sign}3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services' current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

  16. FY 2012 Real Property Deferred, Actual, and Required Maintenance...

    Broader source: Energy.gov (indexed) [DOE]

    More Documents & Publications FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement Real Property Maintenance Reporting Requirement Memorandum...

  17. CRAD, Maintenance - Los Alamos National Laboratory Waste Characterizat...

    Office of Environmental Management (EM)

    Maintenance - Los Alamos National Laboratory Waste Characterization, Reduction, and Repackaging Facility CRAD, Maintenance - Los Alamos National Laboratory Waste Characterization,...

  18. Maintenance Assessment Plan - Developed By NNSA/Nevada Site Office...

    Broader source: Energy.gov (indexed) [DOE]

    MAINTENANCE Assessment Plan NNSANevada Site Office Facility Representative Division Performance Objective: An effective facilities maintenance program should optimize the material...

  19. Planning and Reporting for Operations and Maintenance in Federal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Maintenance Manual for ECMs including: New written operations procedures; Preventive maintenance work procedures and checklists. Project Acceptance IDIQ Attachment...

  20. A Study of Maintenance Contribution to a Joint Production and Preventive maintenance Scheduling Problem in the Robustness

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    A Study of Maintenance Contribution to a Joint Production and Preventive maintenance Scheduling production and Preventive Maintenance (PM) scheduling problem in the robustness framework. The contributions equipment reliability and performance loss under disruption Key words: Production, Preventive maintenance

  1. High Performance Network Monitoring

    SciTech Connect (OSTI)

    Martinez, Jesse E [Los Alamos National Laboratory

    2012-08-10T23:59:59.000Z

    Network Monitoring requires a substantial use of data and error analysis to overcome issues with clusters. Zenoss and Splunk help to monitor system log messages that are reporting issues about the clusters to monitoring services. Infiniband infrastructure on a number of clusters upgraded to ibmon2. ibmon2 requires different filters to report errors to system administrators. Focus for this summer is to: (1) Implement ibmon2 filters on monitoring boxes to report system errors to system administrators using Zenoss and Splunk; (2) Modify and improve scripts for monitoring and administrative usage; (3) Learn more about networks including services and maintenance for high performance computing systems; and (4) Gain a life experience working with professionals under real world situations. Filters were created to account for clusters running ibmon2 v1.0.0-1 10 Filters currently implemented for ibmon2 using Python. Filters look for threshold of port counters. Over certain counts, filters report errors to on-call system administrators and modifies grid to show local host with issue.

  2. Monitoring materials

    DOE Patents [OSTI]

    Orr, Christopher Henry (Calderbridge, GB); Luff, Craig Janson (Calderbridge, GB); Dockray, Thomas (Calderbridge, GB); Macarthur, Duncan Whittemore (Los Alamos, NM)

    2002-01-01T23:59:59.000Z

    The apparatus and method provide techniques for effectively implementing alpha and/or beta and/or gamma monitoring of items or locations as desired. Indirect alpha monitoring by detecting ions generated by alpha emissions, in conjunction with beta and/or gamma monitoring is provided. The invention additionally provides for screening of items prior to alpha monitoring using beta and/or gamma monitoring, so as to ensure that the alpha monitoring apparatus is not contaminated by proceeding direct to alpha monitoring of a heavily contaminated item or location. The invention provides additional versatility in the emission forms which can be monitored, whilst maintaining accuracy and avoiding inadvertent contamination.

  3. Performance Monitoring

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Optimization Performance Monitoring Performance Monitoring A redirector page has been set up without anywhere to redirect to. Last edited: 2014-08-25 14:37:27...

  4. Modeling and Simulation of HVAC Faulty Operations and Performance Degradation due to Maintenance Issues

    SciTech Connect (OSTI)

    Wang, Liping; Hong, Tianzhen

    2013-01-01T23:59:59.000Z

    Almost half of the total energy used in the U.S. buildings is consumed by heating, ventilation and air conditionings (HVAC) according to EIA statistics. Among various driving factors to energy performance of building, operations and maintenance play a significant role. Many researches have been done to look at design efficiencies and operational controls for improving energy performance of buildings, but very few study the impacts of HVAC systems maintenance. Different practices of HVAC system maintenance can result in substantial differences in building energy use. If a piece of HVAC equipment is not well maintained, its performance will degrade. If sensors used for control purpose are not calibrated, not only building energy usage could be dramatically increased, but also mechanical systems may not be able to satisfy indoor thermal comfort. Properly maintained HVAC systems can operate efficiently, improve occupant comfort, and prolong equipment service life. In the paper, maintenance practices for HVAC systems are presented based on literature reviews and discussions with HVAC engineers, building operators, facility managers, and commissioning agents. We categorize the maintenance practices into three levels depending on the maintenance effort and coverage: 1) proactive, performance-monitored maintenance; 2) preventive, scheduled maintenance; and 3) reactive, unplanned or no maintenance. A sampled list of maintenance issues, including cooling tower fouling, boiler/chiller fouling, refrigerant over or under charge, temperature sensor offset, outdoor air damper leakage, outdoor air screen blockage, outdoor air damper stuck at fully open position, and dirty filters are investigated in this study using field survey data and detailed simulation models. The energy impacts of both individual maintenance issue and combined scenarios for an office building with central VAV systems and central plant were evaluated by EnergyPlus simulations using three approaches: 1) direct modeling with EnergyPlus, 2) using the energy management system feature of EnergyPlus, and 3) modifying EnergyPlus source code. The results demonstrated the importance of maintenance for HVAC systems on energy performance of buildings. The research is intended to provide a guideline to help practitioners and building operators to gain the knowledge of maintaining HVAC systems in efficient operations, and prioritize HVAC maintenance work plan. The paper also discusses challenges of modeling building maintenance issues using energy simulation programs.

  5. Titanium addition practice, and maintenance for the hearths in AHMSA`s blast furnaces

    SciTech Connect (OSTI)

    Boone, A.G.; Jimenez, G.; Castillo, J. [Altos Hornos de Mexico, Monclova (Mexico)

    1997-12-31T23:59:59.000Z

    Altos Hornos de Mexico (AHMSA) is a steel company located in Northern Mexico, in the state of Coahuila. Currently there are three blast furnaces in operation and one more about to finish its general repair. This last one is to remain as a back-up unit. Because of blast furnace hearth wear outs AHMSA has developed some maintenance procedures. These procedures are based on titanium ore additions and hearth thermic control monitoring. There are also some other maintenance practices adopted to the working operations to assure that such operations detect and avoid in time hearth wear outs that place personnel and/or the unit in danger (due to hearth leaks). This paper describes titanium ore addition to No. 2 blast furnace during the final campaign and it also illustrates maintenance practices and continuous monitoring of temperature trends both of which were implemented at AHMSA`s No. 5 blast furnace.

  6. Routine {sup 18}F{sup -} production with 180 {mu}A to 200 {mu}A target beam current on a GE PETtrace 800 cyclotron

    SciTech Connect (OSTI)

    Eberl, S.; Eriksson, T.; Svedberg, O.; Norling, J.; Henderson, D.; Lam, P.; Bourdier, T.; Fulham, M. [Department of PET and Nuclear Medicine, Royal Prince Alfred Hospital, Sydney, NSW (Australia); GEMS PET Systems AB, Uppsala (Sweden); Department of PET and Nuclear Medicine, Royal Prince Alfred Hospital, Sydney, NSW (Australia)

    2012-12-19T23:59:59.000Z

    Through upgrades and enhancements, which are now standard on current PETtrace 800 cyclotrons, a GE PETtrace cyclotron installed in 2002 has demonstrated reliable routine [{sup 18}F]FDG production at total target beam currents of 180 {mu}A without detriment to saturation and [{sup 18}F]FDG yields. Routine production at 200 {mu}A has been achieved and its evaluation is continuing. Self-shielded target using W/Cu alloy for the target body afforded a reduction in dose rate from the Havar foils by a factor of {approx} 8-10, reducing dose from the targets and need for removing targets during maintenance. The main activation product in the shield is {sup 187}W (T1/2 24 h). The {sup 60}Co ((T1/2 5.3 y) activation is about 250 times less at 24 h post EOB and is not considered a major issue despite its long half-life.

  7. Second Line of Defense: Electronic Maintenance Reports, Local Maintenance Provider User Guide, Rev. 3

    SciTech Connect (OSTI)

    Leigh, Richard J.

    2012-09-01T23:59:59.000Z

    The Electronic Maintenance Report forms allow Local Maintenance Providers (LMP) and other program staff to enter maintenance information into a simple and secure system. This document describes the features and information required to complete the Maintenance Report forms. It is expected that all Corrective Maintenance Reports from LMPs will be submitted electronically into the SLD Portal. As an exception (e.g., when access to the SLD Portal is unavailable), Maintenance Reports can be submitted via a secure Adobe PDF form available through the Sustainability Manager assigned to each country.

  8. Routine environmental audit of Ames Laboratory, Ames, Iowa

    SciTech Connect (OSTI)

    NONE

    1994-09-01T23:59:59.000Z

    This document contains the findings identified during the routine environmental audit of Ames Laboratory, Ames, Iowa, conducted September 12--23, 1994. The audit included a review of all Ames Laboratory operations and facilities supporting DOE-sponsored activities. The audit`s objective is to advise the Secretary of Energy, through the Assistant Secretary for Environment, Safety and Health, as to the adequacy of the environmental protection programs established at Ames Laboratory to ensure the protection of the environment, and compliance with Federal, state, and DOE requirements.

  9. Occupational exposures during routine activities in coal-fueled power plants

    SciTech Connect (OSTI)

    Bird, M.J.; MacIntosh, D.L.; Williams, P.L. [University of Georgia, Athens, GA (United States). Dept. of Environmental Health Science

    2004-06-15T23:59:59.000Z

    Limited information is available on occupational exposures during routine, nonoutage work activities in coal-fueled power plants. This study evaluated occupational exposures to the principal contaminants in the facilities, including respirable dust (coal dust), arsenic, noise, asbestos, and heat stress. The data were collected over a 3-month period, during the summer of 2001. Each of the 5 facilities was divided into 5 similar exposure groups based on previous exposure assessments and job tasks performed. Of the nearly 400 air samples collected, only 1 exceeded the allowable occupational exposure value. For the noise samples, 55 (about 18%) were equal to or greater than the Occupational Safety and Health Administration (OSHA) 8-hour hearing conservation program level of 85 dBA, and 12 (about 4%) were equal to or greater than the OSHA 8-hour permissible exposure level of 90 dBA. Heat stress monitoring at the facilities indicates that 26% of the 1-hour TWAs were exceeded for one or all of the recommended heat stress limits. The data also concluded that some work sites were above the heat stress ceiling values recommended by the National Institute for Occupational Safety and Health (NIOSH). Four of the 20 employees personally monitored exceeded the recommended limits for heart rate or body core temperature. This suggests there is a potential for heat strain if signs and symptoms are ignored. Recommendations are made to better control the heat stress exposure.

  10. No maintenance -- no energy efficiency

    SciTech Connect (OSTI)

    Szydlowski, R.F.; Schliesing, J.S.; Winiarski, D.W.

    1994-12-01T23:59:59.000Z

    Field investigations illustrate that it is not realistic to expect new high-tech equipment to function for a full life expectancy at high efficiency without significant operations and maintenance (O&M). A simple walk through inspection of most buildings reveals extensive equipment that is being operated on manual override, is incorrectly adjusted and operating inefficiently, or is simply inoperative. This point is illustrated with two examples at Robins Air Force Base, Georgia. The first describes development of a comprehensive, base-wide, steam trap maintenance program. The second describes a measured evaluation from a typical office building. The objective of both examples was to assess the importance of proper O&M. The proposed ``O&M First`` philosophy will result in more efficient building HVAC operation, provide improved services to the building occupants, and reduce energy consumption and unscheduled equipment repair/replacement. Implementation of a comprehensive O&M program will result in a 15--25% energy savings. The O&M foundation that is established will allow other energy conservation activities such is demand side management or energy management and control systems, to achieve and maintain their expected energy savings.

  11. BPAT Systems Maintenance - April 10, 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 4102015 BPAT's e-Tag and OASIS software vendor will be performing...

  12. BPAT Systems Maintenance - May 6, 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notices Rates Standards of Conduct Tariff TF Web Based Training BPAT Systems Maintenance Posted date: 562015 BPAT's e-Tag and OASIS software vendor will be performing...

  13. BPAT Systems Maintenance - May 14, 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notices Rates Standards of Conduct Tariff TF Web Based Training BPAT Systems Maintenance Posted Date: 5142015 BPAT's e-Tag and OASIS software vendor will be performing...

  14. BPAT Systems Maintenance - April 21, 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notices Rates Standards of Conduct Tariff TF Web Based Training BPAT Systems Maintenance Posted Date: 4212015 BPAT's e-Tag and OASIS software vendor will be performing...

  15. BPAT Systems Maintenance - May 13, 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 5132015 BPAT's e-Tag and OASIS software vendor will be performing...

  16. Sandia National Laboratories: Operations and Maintenance Workshop

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    in Hosted by Sandia National Laboratories and the Electric Power Research Institute (EPRI) The 2013 PV Operations and Maintenance Workshop, hosted by Sandia National...

  17. Risk-based budgeting for maintenance dredging

    SciTech Connect (OSTI)

    Walsh, M.R.; Moser, D.A. [Army Corps of Engineers, Ft. Belvoir, VA (United States). Inst. for Water Resources

    1994-12-31T23:59:59.000Z

    The US Army Corps of Engineers must estimate the budget required to conduct maintenance dredging at hundreds of sites across the country. The amount of funds needed to do the maintenance dredging is highly uncertain and there are risks associated with overestimates and underestimates. A risk-based approach to the budgeting process for maintenance dredging can help identify the uncertainty and assess and manage the associated risk. A concept and preliminary plan for a risk-based approach for developing budgets for maintenance dredging is presented.

  18. Scheduling with Fixed Maintenance, Shared Resources and ...

    E-Print Network [OSTI]

    Christina N Burt

    2014-11-30T23:59:59.000Z

    Nov 30, 2014 ... Scheduling with Fixed Maintenance, Shared Resources and Nonlinear Feedrate Constraints: a Mine Planning Case Study. Christina N Burt ...

  19. Optimization Online - Optimizing Preventive Maintenance Models

    E-Print Network [OSTI]

    Michael Bartholomew-Biggs

    2004-06-29T23:59:59.000Z

    Jun 29, 2004 ... Abstract: We deal with the problem of scheduling preventive maintenance (PM) by minimizing a performance function which reflects repair and ...

  20. Sandia National Laboratories: PV Reliability Operations Maintenance...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Maintenance database Sandia-Electric Power Research Institute Partnership Publishes Photovoltaic Reliability Report On January 21, 2014, in Energy, Facilities, Grid...

  1. The Savannah River Site's Groundwater Monitoring Program

    SciTech Connect (OSTI)

    Not Available

    1991-06-18T23:59:59.000Z

    This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted in the fourth quarter of 1990. It includes the analytical data, field data, well activity data, and other documentation for this program, provides a record of the program's activities and rationale, and serves as an official document of the analytical results. The groundwater monitoring program includes the following activities: installation, maintenance, and abandonment of monitoring wells, environmental soil borings, development of the sampling and analytical schedule, collection and analyses of groundwater samples, review of analytical and other data, maintenance of the databases containing groundwater monitoring data, quality assurance (QA) evaluations of laboratory performance, and reports of results to waste-site facility custodians and to the Environmental Protection Section (EPS) of EPD.

  2. Risk Based Maintenance Optimization using Probabilistic Maintenance Quantification Models of Circuit Breaker

    E-Print Network [OSTI]

    Natti, Satish

    2010-01-14T23:59:59.000Z

    New maintenance techniques for circuit breakers are studied in this dissertation by proposing a probabilistic maintenance model and a new methodology to assess circuit breaker condition utilizing its control circuit data. A risk-based decision...

  3. Section 6 -Facilities Usage and Maintenance A. Facilities Usage and Maintenance

    E-Print Network [OSTI]

    Pantaleone, Jim

    Section 6 - Facilities Usage and Maintenance A. Facilities Usage and Maintenance 1 be held financially responsible. Financial responsibility extends to abandoned belongings, excessive is not permitted under any circumstances. Storage facilities are provided in most student housing units for storing

  4. Vehicle Maintenance Procedure Outline the procedure for vehicle maintenance at University of Michigan (U-M).

    E-Print Network [OSTI]

    Kirschner, Denise

    Vehicle Maintenance Procedure Objective Outline the procedure for vehicle maintenance at University of Michigan (U-M). Procedure 1. Your U-M vehicle has a mechanical and/or safety issue. 2. Contact Garage of the vehicle or if needed, have the vehicle towed to the maintenance facility. 4. If a loaner is needed while

  5. Some considerations about the automatic optimisation of parallel linear algebra routines ?

    E-Print Network [OSTI]

    Giménez, Domingo

    factorisation, which his one of the basic routines used in the study of the behaviour of dense lineal algebraSome considerations about the automatic optimisation of parallel linear algebra routines ? Javier of the automatic optimisation of parallel linear algebra software, working mainly with two routines: the LU

  6. NATIONAL RADIO ASTRONOMY OBSERVATORY TITLE: A REVISED VAX FARANT SPLOT ROUTINE AND RELATED APPLE

    E-Print Network [OSTI]

    Groppi, Christopher

    NATIONAL RADIO ASTRONOMY OBSERVATORY TITLE: A REVISED VAX FARANT SPLOT ROUTINE AND RELATED APPLE #12;A REVISED VAX FARANT SPLOT ROUTINE AND RELATED APPLE II PLOTTING PROGRAM. The purpose of this report is to describe some upgrades made to the VAX 1 SPLOT" routine and the related Apple plotting

  7. Routine environmental audit of the Hanford Site, Richland, Washington

    SciTech Connect (OSTI)

    Not Available

    1994-05-01T23:59:59.000Z

    This report documents the results of the routine environmental audit of the Hanford Site (Hanford), Richland, Washington. During this audit, the activities conducted by the audit team included reviews of internal documents an reports from previous audits and assessments; interviews with US Department of Energy (DOE), State of Washington regulatory, and contractor personnel; and inspections and observations of selected facilities and operations. The onsite portion of the audit was conducted May 2--13, 1994, by the DOE Office of Environmental Audit (EH-24), located within the Office of Environment, Safety and Health (EH). The audit evaluated the status of programs to ensure compliance with Federal, State, and local environmental laws and regulations; compliance with DOE orders, guidance, and directives; and conformance with accepted industry practices and standards of performance. The audit also evaluated the status and adequacy of the management systems developed to address environmental requirements.

  8. Void Fraction Instrument operation and maintenance manual

    SciTech Connect (OSTI)

    Borgonovi, G.; Stokes, T.I.; Pearce, K.L.; Martin, J.D.; Gimera, M.; Graves, D.B.

    1994-09-01T23:59:59.000Z

    This Operations and Maintenance Manual (O&MM) addresses riser installation, equipment and personnel hazards, operating instructions, calibration, maintenance, removal, and other pertinent information necessary to safely operate and store the Void Fraction Instrument. Final decontamination and decommissioning of the Void Fraction Instrument are not covered in this document.

  9. Effort estimation for corrective software maintenance

    E-Print Network [OSTI]

    Bae, Doo-Hwan

    Stefanucci Proceedings of the 14th international conference on software engineering and knowledge engineering estimating Size Duration Staff Costs Effort #12;4/20 Introduction (2/2) · Effort estimation ­ Is a valuable asset to maintenance managers in · Planning maintenance · Performing cost/benefits analysis · Approach

  10. Automatic Generation and Maintenance of Correct Spreadsheets

    E-Print Network [OSTI]

    Erwig, Martin

    of "spreadsheet maintenance safety": Up- date operations that are generated from a type-correct tem- plateAutomatic Generation and Maintenance of Correct Spreadsheets Martin Erwig School of EECS Oregon descriptors: D.2.2 [Software Engineering]: Design Tools and Techniques; D.2.7 [Soft- ware Engineering

  11. Functional Prognostic Architecture for the Maintenance of Complex Systems

    E-Print Network [OSTI]

    Pencolé, Yannick

    their functions by new ones. In order to optimize the maintenance cost, it is necessary to perform preventive maintenance to prevent failure occur- rence. Preventive maintenance actions consist in replacing components the date of the next scheduled maintenance phase. In the classical case, preventive maintenance is only

  12. Diagnosis and prognosis for the maintenance of complex systems

    E-Print Network [OSTI]

    Pencolé, Yannick

    --Diagnosis, prognosis, preventive maintenance, complex systems. I. INTRODUCTION Nowadays, system maintenance is a key to decrease the maintenance cost, it is necessary to perform preventive maintenance [3], [4], [5] which alsoDiagnosis and prognosis for the maintenance of complex systems Pauline Ribot1,2 , Yannick Pencol´e1

  13. Absorbed dose measurements during routine equine radiographic procedures

    E-Print Network [OSTI]

    Salinas, Leticia Lamar

    1996-01-01T23:59:59.000Z

    . Absorbed doses were measured for one month at the Texas A&M University Veterinary Teaching Hospital using Li:Mg,Cu,P thermoluminescent dosimeters (TLDs). All personnel present in the x-ray examination room during eqine radiography were monitored using TLDs...

  14. History-Dependent Optimization of Bridge Maintenance and Replacement Decisions Using Markov Decision Process

    E-Print Network [OSTI]

    Robelin, Charles-Antoine; Madanat, Samer M

    2007-01-01T23:59:59.000Z

    ?1997?. “Pontis: A system for maintenance optimization andcycle reliability-based maintenance cost optimization ofbridge inspection, maintenance and replacement optimization

  15. Reservoir-based devices for the monitoring and treatment of disease

    E-Print Network [OSTI]

    Kim, Grace Young

    2008-01-01T23:59:59.000Z

    Cancer mortality still remains high despite significant investments in diagnostics, drug development, and treatment. The systemic route is convenient both for routine monitoring and for drug administration. Local cancer ...

  16. The role of Dynamin in muscle remodeling and maintenance

    E-Print Network [OSTI]

    Nguyen, Jennifer Kim Thu

    2011-01-01T23:59:59.000Z

    muscle attachment and maintenance. PLoS Genet 7, e1001295.in Muscle Remodeling and Maintenance A Thesis submitted inMuscle Remodeling and Maintenance by Jennifer Kim Thu Nguyen

  17. Maintenance scheduling for modular systems-models and algorithms

    E-Print Network [OSTI]

    Zarybnisky, Eric J. (Eric Jack), 1979-

    2011-01-01T23:59:59.000Z

    Maintenance scheduling is an integral part of many complex systems. For instance, without effective maintenance scheduling, the combined effects of preventative and corrective maintenance can have severe impacts on the ...

  18. Optimization models for improving periodic maintenance schedules by utilizing opportunities

    E-Print Network [OSTI]

    Patriksson, Michael

    to this as preventive maintenance activities at an oppor- tunity. The original opportunistic replacement problemOptimization models for improving periodic maintenance schedules by utilizing opportunities Torgny of Technology Abstract We present mathematical models for finding optimal opportunistic maintenance schedules

  19. Modelling maintenance for components under competing risk Helge Langseth

    E-Print Network [OSTI]

    Langseth, Helge

    preventively maintained. The preventive maintenance (PM) is performed periodically with some period , but PMModelling maintenance for components under competing risk Helge Langseth Norwegian University the mathematical modelling of imperfect maintenance of a system under competing risk. The model we propose

  20. Condition-Based Maintenance via Simulation and a Targeted Bayesian

    E-Print Network [OSTI]

    Ben-Gal, Irad E.

    malfunctioning. Accordingly, it is essential to undertake an effective preventive maintenance (PM) policyCondition-Based Maintenance via Simulation and a Targeted Bayesian Network Metamodel Aviv Gruber, Israel ABSTRACT Condition-based maintenance (CBM) is increasingly applied to operational systems

  1. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-06-01T23:59:59.000Z

    To define the program for the management of cost-effective maintenance of Department of Energy (DOE) nuclear facilities. Guidance for compliance with this Order is contained in DOE G 433.1-1, Nuclear Facility Maintenance Management Program Guide for use with DOE O 433.1, which references Federal regulations, DOE directives, and industry best practices using a graded approach to clarify requirements and guidance for maintaining DOE-owned Government property. (Cancels DOE 4330.4B, Chapter II, Maintenance Management Program, dated 2-10-94.) Cancels DOE 4330.4B (in part). Canceled by DOE O 433.1A.

  2. Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994

    SciTech Connect (OSTI)

    Fisk, E.L.

    1994-06-01T23:59:59.000Z

    This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work.

  3. How to Determine and Verify Operating and Maintenance Savings...

    Energy Savers [EERE]

    How to Determine and Verify Operating and Maintenance Savings in Federal Energy Savings Performance Contracts How to Determine and Verify Operating and Maintenance Savings in...

  4. FY 2013 Real Property Deferred, Actual, and Required Maintenance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2013 DARM...

  5. Hopper scheduled maintenance tomorrow (Sept 19) and /project...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    scheduled maintenance tomorrow (Sept 19) and project outage Hopper scheduled maintenance tomorrow (Sept 19) and project outage September 18, 2012 by Helen He (0 Comments) There...

  6. Maintenance & Cleaning Firm Earns Jefferson Lab's Small Business...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Maintenance & Cleaning Firm Earns Jefferson Lab's Small Business Award for 2013 Prestige award Prestige Maintenance staff (left to right) Sandra Coltrain, Operations Managers John...

  7. North Area Right-of-Way Maintenance Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    North Area Right-of-Way Maintenance Project North Area Right-of-Way Maintenance Project Western FONSI (PDF - 487 KB) Final Environmental Assessment (PDF - 4200 KB) Environmental...

  8. air maintenance lufthansa: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Summary: Automated and Scheduled Maintenance of Digital Library Collections Wendy Osborn and Steve Fox and scheduled maintenance of a digital library collection. Existing...

  9. FY 2014 Real Property Data Related to Operations and Maintenance...

    Office of Environmental Management (EM)

    FY 2014 Real Property Data Related to Operations and Maintenance Guidance FY 2014 Real Property Data Related to Operations and Maintenance Guidance FY2014DataRelatedtoOperatio...

  10. Routine environmental reaudit of the Argonne National Laboratory - West

    SciTech Connect (OSTI)

    NONE

    1996-04-01T23:59:59.000Z

    This report documents the results of the Routine Environmental Reaudit of the Argonne National Laboratory - West (ANL-W), Idaho Falls, Idaho. During this audit, the activities conducted by the audit team included reviews of internal documents and reports from previous audits and assessments; interviews with U.S. Department of Energy (DOE), U.S. Environmental Protection Agency (EPA), State of Idaho Department of Health and Welfare (IDHW), and DOE contractor personnel; and inspections and observations of selected facilities and operations. The onsite portion of the audit was conducted from October 11 to October 22, 1993, by the DOE Office of Environmental Audit (EH-24), located within the Office of Environment, Safety and Health (EH). DOE 5482.113, {open_quotes}Environment, Safety, and Health Appraisal Program,{close_quotes} established the mission of EH-24 to provide comprehensive, independent oversight of Department-wide environmental programs on behalf of the Secretary of Energy. The ultimate goal of EH-24 is enhancement of environmental protection and minimization of risk to public health and the environment. EH-24 accomplishes its mission by conducting systematic and periodic evaluations of the Department`s environmental programs within line organizations, and by utilizing supplemental activities that serve to strengthen self-assessment and oversight functions within program, field, and contractor organizations.

  11. BPAT Systems Maintenance - April 8, 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 482015 BPAT's e-Tag and OASIS software vendor will be performing a...

  12. BPAT Systems Maintenance - March 6, 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 362015 BPAT's e-Tag and OASIS software vendor will be performing a...

  13. BPAT Systems Maintenance - November 5, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 1152014 BPAT's e-Tag and OASIS software vendor will be performing a...

  14. BPAT Systems Maintenance - February 9, 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 292015 BPAT's e-Tag and OASIS software vendor will be performing a...

  15. BPAT Systems Maintenance - December 12, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 12122014 BPAT's e-Tag and OASIS software vendor will be performing a...

  16. Risk impact of maintenance program changes

    E-Print Network [OSTI]

    Credit, Kimberly A. (Kimberly April)

    1992-01-01T23:59:59.000Z

    This study quantifies the change in one measure of plant risk, the frequency of loss of long-term decay heat removal, due to changes in maintenance at the James A. Fitzpatrick (JAF) plant. Quantification is accomplished ...

  17. Low-Maintenance Wind Power System

    E-Print Network [OSTI]

    Rasson, Joseph E

    2010-01-01T23:59:59.000Z

    with widespread adoption of wind energy. The project hasProject: Low-Maintenance Wind Power System Summary of theImproved Vertical Axis Wind Turbine and Aerodynamic Control

  18. Operations and Maintenance for Major Equipment Types

    Broader source: Energy.gov [DOE]

    Equipment lies at the heart of all operations and maintenance (O&M) activities. This equipment varies greatly across the Federal sector in age, size, type, model, condition, etc.

  19. A case model for predictive maintenance

    E-Print Network [OSTI]

    Li, Jiawei, M. Eng. Massachusetts Institute of Technology

    2008-01-01T23:59:59.000Z

    This project is to respond to a need by Varian Semiconductor Equipment Associates, Inc. (VSEA) to help predict failure of ion implanters. Predictive maintenance would help to reduce the unscheduled downtime of ion implanters, ...

  20. Significantly reduce maintenance time Documents&Mediabecomesthekey

    E-Print Network [OSTI]

    Mullins, Dyche

    Significantly reduce maintenance time · Documents&Mediabecomesthekey contactforallmaintenanceneeds. · MajorpartsarestoredbyDocuments& MediaattheMissionCenter.Thisreduces thetimeneededtoorderpartsandresultsin&Mediaoffersthecampus communityaconvenientandeconomicsolution foritscopiers,multifunctiondevicesandprinter needs. Print Management Program advantages Reduce

  1. Optimal Preventive Maintenance Under Decision Dependent Uncertainty

    SciTech Connect (OSTI)

    Galenko, Alexander; Popova, Elmira [University of Texas at Austin, 1 University Station, Austin, Texas 78712 (United States); Kee, Ernie; Grantom, Rick [South Texas Project Nuclear Operating Company - STPNOC, P.O. Box 289, Wadsworth, Tx 77483 (United States)

    2006-07-01T23:59:59.000Z

    We analyze a system of N components with dependent failure times. The goal is to obtain the optimal block replacement interval (different for each component) over a finite horizon that minimizes the expected total maintenance cost. In addition, we allow each preventive maintenance action to change the future joint failure time distribution. We illustrate our methodology with an example from South Texas Project Nuclear Operating Company. (authors)

  2. Thermography for Preventive Maintenance and Conservation

    E-Print Network [OSTI]

    Lopez, T.

    1979-01-01T23:59:59.000Z

    THERMOGRAPHY FOR PREVENTIVE MAINTENANCE AND CONSERVATION Tony Lopez Southern California Gas Company Los Angles, California The Supply Situation With fuel prices soaring, more and more companies are looking at energy management as a means... years. In the last twenty years, however, other applica tions have been developed for thermography. Some of these include: medicine, nondestructive testi:ng, aerial land mapping, preventive maintenance and conservation. The balance of this paper...

  3. Understanding Sustainable Transportation Choices: Shifting Routine Automobile Travel to Walking and Bicycling

    E-Print Network [OSTI]

    Schneider, Robert James

    2011-01-01T23:59:59.000Z

    and G.F. Ulfarsson. “Curbing Automobile Use for Sustainablebe able to shift routine automobile travel to pedestrian andChanges in Respondent Automobile Mode Shares Under Different

  4. FY 1994 annual summary report of the surveillance and maintenance activities for the Oak Ridge National Laboratory Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1994-11-01T23:59:59.000Z

    The Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Surveillance and Maintenance (S and M) Program was initiated to manage former waste management and environmental research sites contaminated with radioactive materials and/or hazardous chemicals. The S and M Program is responsible for managing designated sites/facilities from the end of their operating lives until final disposition or site stabilization. To effectively manage and perform the various S and M Program responsibilities, five summary-level work breakdown structure (WBS) elements have been established: S and M Preliminary Investigations, Special Projects, Routine S and M, Inactive Groundwater Wells, and Project Management. Routine S and M activities were conducted as scheduled throughout fiscal years (FY) 1994 at applicable inactive waste management (WM) and other contaminated areas. Overall, the ER S and M Program maintains 47 facilities, performs vegetation maintenance on approximately 230 acres, maintains 54 inactive tanks, and provides overall site management on over 700 acres. In addition to the routine S and M activities, detailed site inspections were conducted at established frequencies on appropriate sites in the ER S and M Program. This document provides a summary of the FY 1994 ORNL ER S and M Program accomplishments.

  5. Interpreting human activity from electrical consumption data through non-intrusive load monitoring

    E-Print Network [OSTI]

    Gillman, Mark Daniel

    2014-01-01T23:59:59.000Z

    Non-intrusive load monitoring (NILM) has three distinct advantages over today's smart meters. First, it offers accountability. Few people know where their kWh's are going. Second, it is a maintenance tool. Signs of wear ...

  6. Towards and embeddable structural health monitoring sensor : design and optimization of MEMS piezoelectric vibration energy harvesters

    E-Print Network [OSTI]

    Mracek, Anna Marie

    2006-01-01T23:59:59.000Z

    Wireless structural health monitoring (SHM) has gained considerable interest as a potential method of reducing aircraft maintenance costs while increasing safety. Distributed power supplies for the sensing nodes are needed ...

  7. Heat Exchanger Monitoring and Its Application to Cleaning and Antifoulant Use

    E-Print Network [OSTI]

    Garcia, E.; Leach, S. H.; VanNostrand, W. L.

    1983-01-01T23:59:59.000Z

    Many refineries and chemical plants are presently experiencing considerable fuel savings and reduced maintenance costs as a result of their heat exchanger monitoring activities. Significant energy credits can be generated with proper applications...

  8. Reference: RGL 81-01 Subject: NATIONWIDE PERMIT-MAINTENANCE

    E-Print Network [OSTI]

    US Army Corps of Engineers

    Reference: RGL 81-01 Subject: NATIONWIDE PERMIT-MAINTENANCE Title: MAINTENANCE DREDGING TO MAINTAIN EXISTING STRUCTURE IN SEC 10 WATERS DOES NOT AUTHORIZE MAINTENANCE DREDGING (1977 REGS). 1 applicable to maintenance dredging. 2. Nationwide permit 322.4(c) authorizes the repair, rehabilitation

  9. University Marketing Communications UMC Web Site Maintenance Service

    E-Print Network [OSTI]

    Sibille, Etienne

    University Marketing Communications UMC Web Site Maintenance Service Overview Content management and ongoing Web site maintenance is an essential part of any Web project plan. When developing a new Web site in Web maintenance activities. Benefits Our Web maintenance service gives you ongoing access to our group

  10. Towards a maintenance and servicing indicator Pascal Vrignat 1

    E-Print Network [OSTI]

    Boyer, Edmond

    : Preventive Maintenance, Maintenance planning, Hidden Markov Model, Failure detection. 1 Introduction, events may be prevented by applying a correct maintenance policy. Some tankers may not have sunk if some maintenance had been correctly applied. Factory should not have exploded with some preventive control

  11. Kernel spectral clustering for predicting maintenance of industrial machines

    E-Print Network [OSTI]

    to deal with sensory faults have been used [1],[2],[3]: corrective maintenance, preventive maintenance the machine fails, it is expensive and safety and environment issues arise. Preventive maintenance is basedKernel spectral clustering for predicting maintenance of industrial machines Rocco Langone1, Carlos

  12. Grouping maintenance strategy with availability constraint under limited

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    with significant assumptions: maintenance durations are neglected and only one preventive maintenance for eachGrouping maintenance strategy with availability constraint under limited repairmen Phuc Do Van Hai maintenance strategies of multi-component systems by integrating two efficient optimization algorithms

  13. Performance evaluation of centralized maintenance workshop by using Queuing Networks

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    maintenance types: Preventive maintenance: different actions are programmed in cycle periods; CorrectivePerformance evaluation of centralized maintenance workshop by using Queuing Networks Zineb Simeu: Maintenance workshop integrated in the job-shop system is required in order to maintain the production

  14. Maintenance and long life of manjemen & pengelolaan dan

    E-Print Network [OSTI]

    Stoffelen, Ad

    : SACA&D Maintenance ­ p.6 #12;ensure operability What does this mean? · preventive maintenanceMaintenance and long life of SACA&D manjemen & pengelolaan dan umur panjang Gerard van der Schrier KNMI BMKG: SACA&D Maintenance ­ p.1 #12;Why SACA&D extreme weather and food security Jakarta Post, 10

  15. Comparison of Selected Model Evaluation Criteria for Maintenance Applications

    E-Print Network [OSTI]

    Huang, Samuel H.

    , Louisville, KY 40292, USA Model-based preventive maintenance relies on creating models that can either loss, and as a whole a sluggish system, the focus has shifted to preventive maintenance. Computerized maintenance systems aid in improving the efficiency of maintenance tasks [28]. The approach of preventive

  16. Optimal Maintenance Scheduling of a Gas Engine Power Plant

    E-Print Network [OSTI]

    Grossmann, Ignacio E.

    to carry out preventive maintenance at regular intervals19 . The maintenance schedule affects many short1 Optimal Maintenance Scheduling of a Gas Engine Power Plant using Generalized Disjunctive with parallel units. Gas engines are shutdown according to a regular maintenance plan that limits the number

  17. Ion Monitoring

    DOE Patents [OSTI]

    Orr, Christopher Henry (Calderbridge, GB); Luff, Craig Janson (Calderbridge, GB); Dockray, Thomas (Calderbridge, GB); Macarthur, Duncan Whittemore (Los Alamos, NM)

    2003-11-18T23:59:59.000Z

    The apparatus and method provide a technique for significantly reducing capacitance effects in detector electrodes arising due to movement of the instrument relative to the item/location being monitored in ion detection based techniques. The capacitance variations are rendered less significant by placing an electrically conducting element between the detector electrodes and the monitored location/item. Improved sensitivity and reduced noise signals arise as a result. The technique also provides apparatus and method suitable for monitoring elongate items which are unsuited to complete enclosure in one go within a chamber. The items are monitored part by part as the pass through the instrument, so increasing the range of items or locations which can be successfully monitored.

  18. Elevated high-density lipoprotein cholesterol and cardiovascular mortality in maintenance hemodialysis patients

    E-Print Network [OSTI]

    Moradi, H; Streja, E; Kashyap, ML; Vaziri, ND; Fonarow, GC; Kalantar-Zadeh, K

    2014-01-01T23:59:59.000Z

    of mortality in maintenance hemo- dialysis patients. Clin Jindices and survival in maintenance hemodialysis patients

  19. Intimacy, Manipulation, and the Maintenance of Social Boundaries at San Quentin Prison

    E-Print Network [OSTI]

    Lindahl, Nicole

    2011-01-01T23:59:59.000Z

    Manipulation, and the Maintenance of Social Boundaries atand volunteers to explore the maintenance and regulation of

  20. Annual summary report of the Decontamination and Decommissioning Surveillance and Maintenance Program at Oak Ridge National Laboratory for period ending September 30, 1993. Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1993-11-01T23:59:59.000Z

    The Oak Ridge National Laboratory (ORNL) Decontamination and Decommissioning (D&D) Program has continued to provide surveillance and maintenance (S&M) support for 34 surplus facilities. The objectives are to (1) ensure adequate containment of residual radioactive materials remaining in the facilities, (2) provide safety and security controls to minimize the potential hazards to on-site personnel and the general public, and (3) manage the facilities in the most cost-effective manner while awaiting decommissioning. This support has included work in three principal areas: (1) S&M planning, (2) routine S&M, and (3) special projects designed to correct serious facility deficiencies beyond the scope of routine maintenance.

  1. Annual summary report of the Decontamination and Decommissioning surveillance and maintenance program at Oak Ridge National Laboratory for period ending September 30, 1992. Environmental Restoration Program

    SciTech Connect (OSTI)

    Ford, M.K.; Holder, L. Jr.

    1992-09-01T23:59:59.000Z

    The Oak Ridge National Laboratory (ORNL) Decontamination and Decommissioning (D&D) Program is part of the Department of Energy (DOE) Environmental Restoration D&D Program and has continued to provide surveillance and maintenance (S&M) support for 34 surplus facilities. The objectives are (1) to ensure adequate containment of residual radioactive materials remaining in the facilities, (2) to provide safety and security controls to minimize the potential hazards to on-site personnel and to the general public, and (3) to manage the facilities in the most cost-effective manner while awaiting decommissioning. This support has included work in three principal areas: (1) S&M planning, (2) routine S&M, and (3) special projects designed to correct serious facility deficiencies beyond the scope of routine maintenance.

  2. Annual summary report of the Decontamination and Decommissioning surveillance and maintenance program at Oak Ridge National Laboratory for period ending September 30, 1992

    SciTech Connect (OSTI)

    Ford, M.K.; Holder, L. Jr.

    1992-09-01T23:59:59.000Z

    The Oak Ridge National Laboratory (ORNL) Decontamination and Decommissioning (D D) Program is part of the Department of Energy (DOE) Environmental Restoration D D Program and has continued to provide surveillance and maintenance (S M) support for 34 surplus facilities. The objectives are (1) to ensure adequate containment of residual radioactive materials remaining in the facilities, (2) to provide safety and security controls to minimize the potential hazards to on-site personnel and to the general public, and (3) to manage the facilities in the most cost-effective manner while awaiting decommissioning. This support has included work in three principal areas: (1) S M planning, (2) routine S M, and (3) special projects designed to correct serious facility deficiencies beyond the scope of routine maintenance.

  3. maintenance. This research is relevant to opera-tions and maintenance challenges facing aging

    E-Print Network [OSTI]

    the need for preventive maintenance or other diagnostic activities on the physical system. Simulationsmaintenance. This research is relevant to opera- tions and maintenance challenges facing aging-benefit of extending the time between overhauls. reducing the probability of a failure in the field. and preventive

  4. A Formal Ontology for Industrial Maintenance Mohamed Hedi KARRAY*, Brigitte CHEBEL-MORELLO*, Noureddine ZERHOUNI*

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    - ing to different strategies (preventive maintenance, predictive maintenance, correc- tive maintenanceA Formal Ontology for Industrial Maintenance Mohamed Hedi KARRAY*, Brigitte CHEBEL of information and communication technol- ogies has resulted in a variety of maintenance support systems

  5. Data Sharing Report for the Quantification of Removable Activity in Various Surveillance and Maintenance Facilities at the Oak Ridge National Laboratory Oak Ridge TN

    SciTech Connect (OSTI)

    King, David A

    2013-12-12T23:59:59.000Z

    The U.S. Department of Energy (DOE) Oak Ridge Office of Environmental Management (OR-EM) requested that Oak Ridge Associated Universities (ORAU), working under the Oak Ridge Institute for Science and Education (ORISE) contract, provide technical and independent waste management planning support using American Recovery and Reinvestment Act (ARRA) funds. Specifically, DOE OR-EM requested that ORAU plan and implement a sampling and analysis campaign targeting potential removable radiological contamination that may be transferrable to future personal protective equipment (PPE) and contamination control materials—collectively referred to as PPE throughout the remainder of this report—used in certain URS|CH2M Oak Ridge, LLC (UCOR) Surveillance and Maintenance (S&M) Project facilities at the Oak Ridge National Laboratory (ORNL). Routine surveys in Bldgs. 3001, 3005, 3010, 3028, 3029, 3038, 3042, 3517, 4507, and 7500 continuously generate PPE. The waste is comprised of Tyvek coveralls, gloves, booties, Herculite, and other materials used to prevent worker exposure or the spread of contamination during routine maintenance and monitoring activities. This report describes the effort to collect and quantify removable activity that may be used by the ORNL S&M Project team to develop radiation instrumentation “screening criteria.” Material potentially containing removable activity was collected on smears, including both masselin large-area wipes (LAWs) and standard paper smears, and analyzed for site-related constituents (SRCs) in an analytical laboratory. The screening criteria, if approved, may be used to expedite waste disposition of relatively clean PPE. The ultimate objectives of this effort were to: 1) determine whether screening criteria can be developed for these facilities, and 2) provide process knowledge information for future site planners. The screening criteria, if calculated, must be formally approved by Federal Facility Agreement parties prior to use for ORNL S&M Project PPE disposal at the Environmental Management Waste Management Facility (EMWMF). ORAU executed the approved sampling and analysis plan (SAP) (DOE 2013) while closely coordinating with ORNL S&M Project personnel and using guidelines outlined in the Waste Handling Plan for Surveillance and Maintenance Activities at the Oak Ridge National Laboratory, DOE/OR/01-2565&D2 (WHP) (DOE 2012). WHP guidelines were followed because the PPE waste targeted by this SAP is consistent with that addressed under the approved Waste Lot (WL) 108.1 profile for disposal at EMWMF—this PPE is a “future waste stream” as defined in the WHP. The SAP presents sampling strategy and methodology, sample selection guidelines, and analytical guidelines and requirements necessary for characterizing future ORNL S&M Project PPE waste. This report presents a review of the sample and analysis methods including data quality objectives (DQOs), required deviations from the original design, summary of field activities, radiation measurement data, analytical laboratory results, a brief presentation of results, and process knowledge summaries.

  6. Standard evaluation techniques for containment and surveillance radiation monitors

    SciTech Connect (OSTI)

    Fehlau, P.E.

    1982-01-01T23:59:59.000Z

    Evaluation techniques used at Los Alamos for personnel and vehicle radiation monitors that safeguard nuclear material determine the worst-case sensitivity. An evaluation tests a monitor's lowest sensitivity regions with sources that have minimum emission rates. The result of our performance tests are analyzed as a binomial experiment. The number of trials that are required to verify the monitor's probability of detection is determined by a graph derived from the confidence limits for a binomial distribution. Our testing results are reported in a way that characterizes the monitor yet does not compromise security by revealing its routine performance for detecting process materials.

  7. Electrostatic monitoring

    DOE Patents [OSTI]

    Orr, Christopher Henry (Cumbria, GB); Luff, Craig Janson (Cumbria, GB); Dockray, Thomas (Cumbria, GB); Macarthur, Duncan Whittemore (Los Alamos, NM)

    2001-01-01T23:59:59.000Z

    The apparatus and method provide a technique for more simply measuring alpha and/or beta emissions arising from items or locations. The technique uses indirect monitoring of the emissions by detecting ions generated by the emissions, the ions being attracted electrostatically to electrodes for discharge of collection. The apparatus and method employ a chamber which is sealed around the item or location during monitoring with no air being drawn into or expelled from the chamber during the monitoring process. A simplified structure and operations arises as a result, but without impairing the efficiency and accuracy of the detection technique.

  8. 1999 Environmental Monitoring Program Report

    SciTech Connect (OSTI)

    L. V. Street

    2000-09-01T23:59:59.000Z

    This report describes the calendar year 1999 compliance monitoring and environmental surveillance activities of the Idaho National Engineering and Environmental Laboratory management and operating contractor Environmental Monitoring Program. This report includes results of sampling performed by the Drinking Water, Effluent, Storm Water, Groundwater Monitoring, and Environmental Surveillance Programs. This report compares the 1999 results to program-specific regulatory guidelines and past data to evaluate trends. The primary purposes of the monitoring and surveillance activities are to evaluate environmental conditions, to provide and interpret data, to verify compliance with applicable regulations or standards, and to ensure protection of public health and the environment. Surveillance of environmental media did not identify any previously unknown environmental problems or trends, which would indicate a loss of control or unplanned releases from facility operations. The Idaho National Engineering and Environmental Laboratory complied with permits and applicable regulations, with the expectation of nitrogen in two disposal pond effluent streams iron and total coliform bacteria in groundwater downgradient from one disposal well, and coliform bacteria in drinking water systems at two facilities. Maintenance activities were performed on the two drinking water systems and tested prior to putting back into service. The monitoring and surveillance results demonstrate that the public health and environment were protected.

  9. SITE MAINTENANCE PLAN CSMRI SITE REMEDIATION

    E-Print Network [OSTI]

    ...............................................................................3 3.2 Bagged Materials Storage Area Management....................................................3...............................................................................................................5 5.2 Ground and Surface Water Monitoring

  10. Exposure assessment strategies for non-routine work operations (NORWO)

    SciTech Connect (OSTI)

    Lew, V.; Johnson, J.; Chiusano, S.; McLouth, L.

    1993-12-01T23:59:59.000Z

    This meeting is the second in a series of a cooperative effort between the Industrial Hygiene Division of the Office of Health (EH-40) and the Office of Oversight (EM-23) to gain input for the development of a section on NORWO exposure assessment in the Exposure Assessment Strategies and HAZWOPER technical guidance manuals. The first day of the meeting was dedicated to a seminar relating to AIHA Strategy for Occupational Exposure Assessment to NORWO situations. Jeff Miller and Tom Weeda of Radian were the course instructors. The course covered how the elements of basic characterization, prioritization, monitoring and decision making could apply to NORWO situations. Several examples of applications of statistical analysis for decision making were illustrated. In addition, the seminar brought forth some points that need additional examination before the strategy can be applied to NORWO. They are: should qualitative and semi-quantitative data be applied to statistical decision making; should professional judgment be balanced with an acceptable degree of statistical certainty; and the need for development of a standardized application of statistics for the DOE Health & Safety community. The remaining two days of the meeting were devoted to the continued development of guidelines to measure and document, in a technically correct and consistent manner, the exposures DOE environmental restoration and waste management (ERWM) workers receive during NORWO and reflects the perspectives and experiences of the attendees. Formal presentations were given by representatives from Hanford and INEL.

  11. Monitoring microbial corrosion in large oilfield water systems

    SciTech Connect (OSTI)

    Chen, E.Y.; Chen, R.B.

    1983-03-01T23:59:59.000Z

    Monitoring of microbial corrosion is always difficult because of the sessile nature of bacteria and the lack of meaningful correlation between routine bacteria counts and bacterial activity. This problem is further aggravated in a large oilfield water system because of its size and sampling difficulties. This paper discusses some monitoring techniques currently used in the oil industry, their limitations and the possible areas for improvement. These suggested improvements either are presently being implemented or will be implemented in the Aramco systems.

  12. Monitoring microbial corrosion in large oilfield water systems

    SciTech Connect (OSTI)

    Chen, E.Y.; Chen, R.B.

    1984-07-01T23:59:59.000Z

    Monitoring of microbial corrosion is always difficult because of the sessile nature of bacteria and the lack of meaningful correlation between routine bacteria counts and bacterial activity. This problem is further aggravated in a large oilfield water system because of size and sampling difficulties. This paper discusses some monitoring techniques currently used in the oil industry, their limitations, and possible areas for improvement. These improved techniques are in use or will be implemented in the Aramco systems.

  13. 912 IEEE TRANSACTIONS ON POWER DELIVERY, VOL. 19, NO. 3, JULY 2004 Robotic Monitoring of Power Systems

    E-Print Network [OSTI]

    Mamishev, Alexander

    --Monitoring of electric power systems in real time for reliability, aging status, and presence of incipient faults focuses on one trend of power system monitoring, namely, mobile monitoring. The developments in robotic maintenance for power systems indicate significant potential of this technological approach. Authors discuss

  14. Analyse retard des mesures d'auscultation de barrages Delayed response analysis of dam monitoring data

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    of dam monitoring data Stéphane Bonelli Cemagref Unité de recherche Ouvrages hydrauliques et équipements. Long series of monitoring data are obtained during the routine operation of a dam. To understand the long term behaviour of a dam, it is essential to carefully interpret the dissipative effects which tend

  15. Wind Energy Facility Reliability and Maintenance

    E-Print Network [OSTI]

    Ding, Yu

    Wind Energy Facility Reliability and Maintenance Eunshin Byon, Lewis Ntaimo, Chanan Singh and Yu related to wind energy facility reliability and mainte- nance focused more on qualitative aspects. In this chapter, we provide a comprehensive account of the existing research regarding wind energy facility

  16. A Ubiquitous Computing Environment for Aircraft Maintenance

    E-Print Network [OSTI]

    practical experience from a project that was carried out in cooperation with an aircraft company1 and SAP SI level of usability. A scenario, a systems architecture, and maintenance applications are presented Descriptors J.7 [Computer Applications]: Computers in Other Systems ­ industrial control, process control

  17. ICD Complex Operations and Maintenance Plan

    SciTech Connect (OSTI)

    Gibson, P. L.

    2007-06-25T23:59:59.000Z

    This Operations and Maintenance (O&M) Plan describes how the Idaho National Laboratory (INL) conducts operations, winterization, and startup of the Idaho CERCLA Disposal Facility (ICDF) Complex. The ICDF Complex is the centralized INL facility responsible for the receipt, storage, treatment (as necessary), and disposal of INL Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) remediation waste.

  18. Davis PV plant operation and maintenance manual

    SciTech Connect (OSTI)

    NONE

    1994-09-01T23:59:59.000Z

    This operation and maintenance manual contains the information necessary to run the Photovoltaics for Utility Scale Applications (PVUSA) test facility in Davis, California. References to more specific information available in drawings, data sheets, files, or vendor manuals are included. The PVUSA is a national cooperative research and demonstration program formed in 1987 to assess the potential of utility scale photovoltaic systems.

  19. A process for risk-focused maintenance

    SciTech Connect (OSTI)

    Lofgren, E.V.; Cooper, S.E.; Kurth, R.E.; Phillips, L.B. (Science Applications International Corp., McLean, VA (USA))

    1991-03-01T23:59:59.000Z

    This report presents a process for focusing maintenance resources on components that enable nuclear plant systems to perform their essential functions and on components whose failure may initiate challenges to safety systems, so as to have the greatest impact in decreasing risk. The process provides criteria, based on risk, for deciding which components are critical to risk and determining what maintenance activities are required to ensure reliable operation of those risk-critical components. Two approaches are provided for selection of risk-critical components. One approach uses the results of a Probabilistic Risk Assessment (PRA); the other is based on the methodology developed for this report, which has a basis in PRA although it does not use the results of a PRA study. Following identification of risk-critical components, both approaches use a single methodology for determining what maintenance activities are required to ensure reliable operation of the identified components. The report also provides demonstrations of application of the two approaches to selection of risk-critical components and demonstrations of application of the methodology for determining what maintenance activities are required to an active standby safety system, a normally operating system, and passive components. 5 refs., 11 figs., 1 tab.

  20. Achieving a "SIL 1" TCR Monitoring System

    E-Print Network [OSTI]

    Bartolomé, R; Scibile, L; Grau, S

    2001-01-01T23:59:59.000Z

    SIL 1 (Safety Integrity Level 1) refers to the quantification and measurement of the availability, reliability, maintenance and safety of the monitoring system. In the last few years the computer infrastructure used to acquire and to diffuse data to the TCR has evolved very rapidly. A number of measures in hardware, software and management have been introduced to cope with this situation. These include: the Multipurpose Monitoring Device (MMD), a standard data acquisition platform used in the renovation of old front end monitoring equipment, the Smart Equipment Controller (Dsec), a driver that reduces the layers in the data diffusion pyramid, the multiplatform monitoring software to integrate the different SCADA systems, a software configuration tool (RAZOR) for problem tracking and version control, and a complete development environment reproducing a real installation for thorough testing of any changes. To achieve SIL 1 objectives, while mastering the evolution of our systems will be the challenge for the c...

  1. Monitoring well

    DOE Patents [OSTI]

    Hubbell, Joel M. (Idaho Falls, ID); Sisson, James B. (Idaho Falls, ID)

    2002-01-01T23:59:59.000Z

    The present invention relates to a monitoring well which includes an enclosure defining a cavity and a water reservoir enclosed within the cavity and wherein the reservoir has an inlet and an outlet. The monitoring well further includes a porous housing borne by the enclosure and which defines a fluid chamber which is oriented in fluid communication with the outlet of the reservoir, and wherein the porous housing is positioned in an earthen soil location below-grade. A geophysical monitoring device is provided and mounted in sensing relation relative to the fluid chamber of the porous housing; and a coupler is selectively moveable relative to the outlet of reservoir to couple the porous housing and water reservoir in fluid communication. An actuator is coupled in force transmitting relation relative to the coupler to selectively position the coupler in a location to allow fluid communication between the reservoir and the fluid chamber defined by the porous housing.

  2. Duck Valley Reservoirs Fish Stocking and Operation and Maintenance, 2006-2007 Annual Progress Report.

    SciTech Connect (OSTI)

    Sellman, Jake; Dykstra, Tim [Shoshone-Paiute Tribes

    2009-05-11T23:59:59.000Z

    The Duck Valley Reservoirs Fish Stocking and Operations and Maintenance (DV Fisheries) project is an ongoing resident fish program that serves to partially mitigate the loss of anadromous fish that resulted from downstream construction of the hydropower system. The project's goals are to enhance subsistence fishing and educational opportunities for Tribal members of the Shoshone-Paiute Tribes and provide resident fishing opportunities for non-Tribal members. In addition to stocking rainbow trout (Oncorhynchus mykiss) in Mountain View, Lake Billy Shaw, and Sheep Creek Reservoirs, the program is also designed to maintain healthy aquatic conditions for fish growth and survival, to provide superior facilities with wilderness qualities to attract non-Tribal angler use, and to offer clear, consistent communication with the Tribal community about this project as well as outreach and education within the region and the local community. Tasks for this performance period are divided into operations and maintenance plus monitoring and evaluation. Operation and maintenance of the three reservoirs include fences, roads, dams and all reservoir structures, feeder canals, water troughs and stock ponds, educational signs, vehicles and equipment, and outhouses. Monitoring and evaluation activities included creel, gillnet, wildlife, and bird surveys, water quality and reservoir structures monitoring, native vegetation planting, photo point documentation, control of encroaching exotic vegetation, and community outreach and education. The three reservoirs are monitored in terms of water quality and fishery success. Sheep Creek Reservoir was very unproductive this year as a fishery. Fish morphometric and water quality data indicate that the turbidity is severely impacting trout survival. Lake Billy Shaw was very productive as a fishery and received good ratings from anglers. Mountain View was also productive and anglers reported a high number of quality sized fish. Water quality (specifically dissolved oxygen and temperature) is the main limiting factor in our fisheries.

  3. Duck Valley Reservoirs Fish Stocking and Operation and Maintenance, 2005-2006 Annual Progress Report.

    SciTech Connect (OSTI)

    Sellman, Jake; Dykstra, Tim [Shoshone-Paiute Tribes

    2009-05-11T23:59:59.000Z

    The Duck Valley Reservoirs Fish Stocking and Operations and Maintenance (DV Fisheries) project is an ongoing resident fish program designed to enhance both subsistence fishing, educational opportunities for Tribal members of the Shoshone-Paiute Tribes, and recreational fishing facilities for non-Tribal members. In addition to stocking rainbow trout (Oncorhynchus mykiss) in Mountain View, Lake Billy Shaw, and Sheep Creek Reservoirs, the program also intends to afford and maintain healthy aquatic conditions for fish growth and survival, to provide superior facilities with wilderness qualities to attract non-Tribal angler use, and to offer clear, consistent communication with the Tribal community about this project as well as outreach and education within the region and the local community. Tasks for this performance period are divided into operations and maintenance plus monitoring and evaluation. Operation and maintenance of the three reservoirs include fences, roads, dams and all reservoir structures, feeder canals, water troughs and stock ponds, educational signs, vehicles and equipment, and outhouses. Monitoring and evaluation activities included creel, gillnet, wildlife, and bird surveys, water quality and reservoir structures monitoring, native vegetation planting, photo point documentation, control of encroaching exotic vegetation, and community outreach and education. The three reservoirs are monitored in terms of water quality and fishery success. Sheep Creek Reservoir was the least productive as a result of high turbidity levels and constraining water quality parameters. Lake Billy Shaw trout were in poorer condition than in previous years potentially as a result of water quality or other factors. Mountain View Reservoir trout exhibit the best health of the three reservoirs and was the only reservoir to receive constant flows of water.

  4. Long-Term Surveillance Operations and Maintenance Fiscal Year...

    Broader source: Energy.gov (indexed) [DOE]

    The Long-Term Surveillance Operations and Maintenance (LTS-O&M) subtask has a critical long-term surveillance and maintenance (LTS&M) role for the U.S. Department of Energy (DOE)...

  5. North Area Right-of-Way Maintenance Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Sacramento Valley Right-of-Way Maintenance Project Sacramento Valley Right-of-Way Maintenance Project Final EA Report Cover Vol I August 2005(PDF - 492 MG) Final EA Main Volume...

  6. WINCO maintenance before and after DOE 4330.4A

    SciTech Connect (OSTI)

    Remsburg, R.E.

    1993-04-27T23:59:59.000Z

    This report discusses numerous elements of the maintenance program at the Idaho Chemical Processing Plant (ICPP) which have undergone changes during the last 5 years. Looking back, many of the maintenance program changes prior to 1991 were fragmented. Maintenance program elements were being ratcheted to address specific productivity and safety concerns. The improvements were warranted, but often improvements were implemented without a systematic review of how they impacted other maintenance program elements. After 1990 when WINCO began using the Chapter II guidelines of DOE Order 4330.4A as a maintenance program model, there was a marked improvement in the quality of the maintenance program changes. The post 1990 changes have been part of a systematic plan that has been communicated to all of the maintenance players. The Chapter II guidelines and the maintenance implementation plan (MIP) personnel with a focus for improvement that was missing prior to 1991.

  7. Routine care provided by specialists to children and adolescents in the United States: 2002-2006

    E-Print Network [OSTI]

    Valderas, Jose M; Starfield, Barbara; Forrest, Christopher B; Rajmil, Luis; Roland, Martin; Sibbald, Bonnie

    2009-12-04T23:59:59.000Z

    was to quantify and characterize routine and co-managed pediatric healthcare as provided by specialists in community settings. Methods Nationally representative data were obtained from the National Ambulatory Medical Care Survey for the years 2002-2006. We...

  8. A study of the effects of claim experience on Texas contractors' routine record keeping

    E-Print Network [OSTI]

    Camp, Gerald Miller

    1986-01-01T23:59:59.000Z

    with patterns of routine record keeping as affected by the independent variable of prior claim experience. The second hypothesis deals with expected value in a future claim situation of twenty six dependent variables in regard to the independent variable...

  9. An Intact Centrosome Is Required for the Maintenance of Polarization during Directional Cell Migration

    E-Print Network [OSTI]

    Wakida, Nicole M.; Botvinick, Elliot L.; Lin, Justin; Berns, Michael W.

    2010-01-01T23:59:59.000Z

    Is Required for the Maintenance of Polarization duringis necessary for the maintenance of polarization duringa critical role in the maintenance of cytoskeletal asymmetry

  10. Study of LATERAL ORGAN BOUNDARIES (LOB) Genetic Pathways in Boundary Maintenance of Arabidopsis

    E-Print Network [OSTI]

    Yu, Lifeng

    2012-01-01T23:59:59.000Z

    Boundary formation and maintenance in tissue development.2002). Shoot meristem maintenance is controlled by a GRAS-et al. , 2005). The maintenance of the polarity of GA

  11. Adaptive Optimization and Systematic Probing of Infrastructure System Maintenance Policies under Model Uncertainty

    E-Print Network [OSTI]

    Madanat, S M; Park, Sejung; Kuhn, K D

    2006-01-01T23:59:59.000Z

    S. ?2002?. “Optimal maintenance and repair policies inM. I. ?1987?. “Optimal maintenance decisions for pavement?1997?. “Pontis: A system for maintenance optimization and

  12. Modeling and Simulation of HVAC Faulty Operations and Performance Degradation due to Maintenance Issues

    E-Print Network [OSTI]

    Wang, Liping

    2014-01-01T23:59:59.000Z

    for Inspection and Maintenance of Commercial Building HVACCIBSE. 2008. Guide M, Maintenance engineering and managementDegradation due to Maintenance Issues Liping Wang, Tianzhen

  13. Access to Care for Methadone Maintenance Patients in the United States

    E-Print Network [OSTI]

    Hettema, Jennifer E.; Sorensen, James L.

    2009-01-01T23:59:59.000Z

    J. L. (2007). Methadone maintenance therapy in residentialet al. 2006). Methadone maintenance therapy (MMT) has highlyto Care for Methadone Maintenance Patients in the United

  14. Defining a genetic framework for stem cell niche maintenance in the Drosophila testis

    E-Print Network [OSTI]

    Voog, Justin C.

    2009-01-01T23:59:59.000Z

    that promote stem cell maintenance throughout life. (2008)M. , and Nagasawa, T. Maintenance of the hematopoietic stemis essential for the maintenance and division of germline

  15. Novel role of caspase-8 in the maintenance of epidermal regeneration and repair

    E-Print Network [OSTI]

    Lee, Pedro

    2011-01-01T23:59:59.000Z

    of caspase-like family in maintenance of cytoskeletonof Caspase-8 in the Maintenance of Epidermal Regenerationof Caspase-8 in the Maintenance of Epidermal Regeneration

  16. Network-Level Reliability-Based Bridge Inspection, Maintenance and Replacement Optimization Model

    E-Print Network [OSTI]

    Robelin, Charles-Antoine; Madanat, S M

    2006-01-01T23:59:59.000Z

    years) Interval between maintenance of type 2 (years) nonenone none Period of blocked maintenance (years) none noneShepard. Pontis: A System for Maintenance Optimization and

  17. A standardized and safe method of sterile field maintenance during intra-operative horizontal plane fluoroscopy

    E-Print Network [OSTI]

    Kaska, Serge C

    2010-01-01T23:59:59.000Z

    method of sterile field maintenance during intra-operativemethod of sterile field maintenance during intra-operativemethod of sterile field maintenance during intra-operative

  18. Triggers and maintenance of multiple shifts in the state of a natural community

    E-Print Network [OSTI]

    Rassweiler, Andrew; Schmitt, Russell J.; Holbrook, Sally J.

    2010-01-01T23:59:59.000Z

    PAPER Triggers and maintenance of multiple shifts in theseparately on the causes and maintenance of state change canpotentially explaining the maintenance of the new state.

  19. Bone Growth, Maintenance and Loss in the Neolithic Community of Çatalhöyük, Turkey: Preliminary Results

    E-Print Network [OSTI]

    Agarwal, Sabrina; Glencross, Bonnie; Beauchesne, Patrick

    2011-01-01T23:59:59.000Z

    Bone Growth, Maintenance and Loss in the Neolithic CommunityThe examination of bone maintenance and loss is another wellchanging patterns of bone maintenance typically observed in

  20. Maintenance and Operations study for K basins sludge treatment

    SciTech Connect (OSTI)

    WESTRA, A.G.

    1998-11-30T23:59:59.000Z

    This study evaluates maintenance and operating concepts for the chemical treatment of sludge from the 100 K Basins at Hanford. The sludge treatment equipment that will require remote operation or maintenance was identified. Then various maintenance and operating concepts used in the nuclear industry were evaluated for applicability to sludge treatment. A hot cell or cells is recommended as the best maintenance and operating concept for a sludge treatment facility.

  1. Monitoring well

    DOE Patents [OSTI]

    Hubbell, Joel M. (Idaho Falls, ID); Sisson, James B. (Idaho Falls, ID)

    1999-01-01T23:59:59.000Z

    A monitoring well including a conduit defining a passageway, the conduit having a proximal and opposite, distal end; a coupler connected in fluid flowing relationship with the passageway; and a porous housing borne by the coupler and connected in fluid flowing relation thereto.

  2. Monitoring well

    DOE Patents [OSTI]

    Hubbell, J.M.; Sisson, J.B.

    1999-06-29T23:59:59.000Z

    A monitoring well is described which includes: a conduit defining a passageway, the conduit having a proximal and opposite, distal end; a coupler connected in fluid flowing relationship with the passageway; and a porous housing borne by the coupler and connected in fluid flowing relation thereto. 8 figs.

  3. Modelling of dependence between critical failure and preventive maintenance

    E-Print Network [OSTI]

    Langseth, Helge

    Modelling of dependence between critical failure and preventive maintenance: The repair alert model, or a preventive maintenance (PM) action, where the latter will prevent the failure. It is reasonable to expect that the failure can be avoided by a possible preventive maintenance (PM) at some random time Z. If Z

  4. A MAINTENANCE MODEL FOR COMPONENTS EXPOSED TO SEVERAL FAILURE MECHANISMS

    E-Print Network [OSTI]

    Langseth, Helge

    . The preventive maintenance (PM) is performed periodically with some fixed period , but PM can also be performed describe the "goodness" of the maintenance crew; their ability to prevent failures by performing thorough is assumed to undergo preventive maintenance (PM), usually at fixed time periods > 0. In addition

  5. Maintenance policy: degradation laws versus Hidden Markov Model availability indicator

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    INTRODUCTION Industrial processes need to be maintained to prevent breakdown. Some years ago, maintenance, logistic... Different kinds of maintenance policy can be applied: preventive or corrective according to manager strategies. In case of preventive maintenance, different strategies should be used like planned

  6. Modelling of dependence between critical failure and preventive maintenance

    E-Print Network [OSTI]

    Langseth, Helge

    Modelling of dependence between critical failure and preventive maintenance: The repair alert model, or a preventive maintenance (PM) action, where the latter will prevent the failure. It is reasonable to expect be avoided by a possible preventive maintenance (PM) at some random time Z. If Z

  7. `ODDS ALGORITHM'-BASED OPPORTUNISTIC MAINTENANCE FOR PRESERVING COMPONENT PERFORMANCES

    E-Print Network [OSTI]

    Boyer, Edmond

    part (McCall, 1963). Then an opportunistic maintenance is any action that combines a preventive`ODDS ALGORITHM'-BASED OPPORTUNISTIC MAINTENANCE FOR PRESERVING COMPONENT PERFORMANCES E. Levrat, E Vandoeuvre (France) Abstract: Today, a new role for maintenance exists to enhance the eco

  8. Commencement Activities & Facility Maintenance Closures Updated Monday 4/29

    E-Print Network [OSTI]

    von der Heydt, Rüdiger

    · Fitness Center & Weight Room equipment cleaning, preventive maintenance, and layout changes #12;Commencement Activities & Facility Maintenance Closures Updated Monday 4/29 Spring Semester Normal Maintenance projects. · The Rec Center will be closed Monday 5/20 ­ Sunday 6/9. · The Rec Center reopens

  9. Workforce-Constrained Preventive Maintenance Scheduling using Evolution Strategies

    E-Print Network [OSTI]

    Terwilliger, Mark

    Workforce-Constrained Preventive Maintenance Scheduling using Evolution Strategies ABSTRACT Heavy of minimizing the makespan for a set of preventive maintenance (PM) tasks, requiring single- or multiple approach to the SA approach for this class of PM problems. Subject Area: Preventive Maintenance, Evolution

  10. Maintenance Guide for Greenhouse Ventilation, Evaporative Cooling Heating Systems1

    E-Print Network [OSTI]

    Watson, Craig A.

    when the need is discovered, but a good preventive maintenance program will reduce the number. This fact sheet will emphasize corrective and preventive maintenance procedures for ventilation, evaporativeAE26 Maintenance Guide for Greenhouse Ventilation, Evaporative Cooling Heating Systems1 D. E

  11. Probabilistic service life prediction and maintenance planning of deteriorating structures

    E-Print Network [OSTI]

    Garavaglia, Elsa

    life prediction of a bridge pier and to the selection of a suitable preventive maintenance scenario. 1 with an aggressive environment, and to eventually plan a process of essential and/or preventive maintenance, some preventive maintenance scenario. 2 RELIABILITY OF DETERIORATING STRUCTURAL SYSTEMS The deterioration

  12. Optimal Resurfacing Decisions for Road Maintenance: A POMDP Perspective

    E-Print Network [OSTI]

    Boyer, Edmond

    . Numerical examples have shown that our model provides a preventive maintenance policy that slows downOptimal Resurfacing Decisions for Road Maintenance: A POMDP Perspective Mariem Zouch, Thomas Yeung / IRCCyN, F-44307 NANTES Cedex, France Keywords: Road deterioration, maintenance optimization, Partially

  13. Optimal Maintenance Scheduling of a Power Plant with Seasonal

    E-Print Network [OSTI]

    Grossmann, Ignacio E.

    -Wide Optimization Meeting · Plan preventive maintenance shutdowns ­ Minimize payment for skilled labor ­ Save onlineOptimal Maintenance Scheduling of a Power Plant with Seasonal Electricity Tariffs Pedro M. Castro maintenance team doing shutdowns · Shutdown period mandatory after [ , ] h online · Challenging (hard

  14. IEEE TRANSACTIONS ON RELIABILITY 1 Optimal Maintenance Strategies for Wind

    E-Print Network [OSTI]

    Ntaimo, Lewis

    from sensors, our research objective is to derive an optimal observation and preventive maintenance TRANSACTIONS ON RELIABILITY 3 ACRONYMS NA no action PM preventive maintenance OB observation CM correctiveIEEE TRANSACTIONS ON RELIABILITY 1 Optimal Maintenance Strategies for Wind Turbine Systems Under

  15. Single-machine Multiple-recipe Predictive Maintenance , John Hasenbein

    E-Print Network [OSTI]

    Hasenbein, John

    preventative and corrective maintenance costs, holdings costs, and possibly production costs. An optimal policy. In a conventional preventive maintenance policy, it is typically assumed that the decision maker knows only when, conventional preventive maintenance policies are often one of two types: calendar-based or job

  16. Experiment #1 Maintenance of UV/vis Instruments

    E-Print Network [OSTI]

    Nazarenko, Alexander

    considerably worse than it should be. For these reasons, most companies have a preventive maintenance program that might be included in a preventive maintenance program for a UV-visible spectrometer. Your taskExperiment #1 Maintenance of UV/vis Instruments Objectives: 1. Learn how to use different UV

  17. Analysis of Preventive Maintenance in Transactions Based Software Systems

    E-Print Network [OSTI]

    Telek, Miklós

    Analysis of Preventive Maintenance in Transactions Based Software Systems Sachin Garg 1 , Antonio''. However, it incurs some overhead. The necessity to do preventive maintenance not only in general purpose to illustrate the usefulness and applicability of the models. Keywords: Preventive Maintenance, Transactions

  18. A contextual semantic mediator for a distributed cooperative maintenance platform

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    A contextual semantic mediator for a distributed cooperative maintenance platform Mohamed-Mechatronic Systems department (AS2M) {hedi.karray, Brigitte.morello, Noureddine.zerhouni}@femto-st.fr Abstract-Platforms expand maintenance systems from centralized systems into e-maintenance platforms integrating various

  19. A plasma process monitor/control system

    SciTech Connect (OSTI)

    Stevenson, J.O.; Ward, P.P.; Smith, M.L. [Sandia National Labs., Albuquerque, NM (United States); Markle, R.J. [Advanced Micro Devices, Inc., Austin, TX (United States)

    1997-08-01T23:59:59.000Z

    Sandia National Laboratories has developed a system to monitor plasma processes for control of industrial applications. The system is designed to act as a fully automated, sand-alone process monitor during printed wiring board and semiconductor production runs. The monitor routinely performs data collection, analysis, process identification, and error detection/correction without the need for human intervention. The monitor can also be used in research mode to allow process engineers to gather additional information about plasma processes. The plasma monitor can perform real-time control of support systems known to influence plasma behavior. The monitor can also signal personnel to modify plasma parameters when the system is operating outside of desired specifications and requires human assistance. A notification protocol can be selected for conditions detected in the plasma process. The Plasma Process Monitor/Control System consists of a computer running software developed by Sandia National Laboratories, a commercially available spectrophotometer equipped with a charge-coupled device camera, an input/output device, and a fiber optic cable.

  20. Know how to maximize maintenance spending

    SciTech Connect (OSTI)

    Carrino, A.J.; Jones, R.B.; Platt, W.E.; Tiffany, E.D. [Solomon Associates (United States)

    2009-07-15T23:59:59.000Z

    Solomon has developed a methodology to determine a large optimum point where availability meets maintenance spending for Powder River Basin (PRB) coal-fired units. Using a database of sufficient size and composition across various operating ranges, Solomon generated an algorithm that predicts the relationship between maintenance spending and availability. Coupling this generalized algorithm with a unit-specific market-loss curve determines the optimum spending for a facility. The article presents the results of the analysis, how this methodology can be applied to develop optimum operating and financial targets for specific units and markets and a process to achieve those targets. It also describes how this methodology can be used for other types of fossil-fired technologies and future enhancements to the analysis. 5 figs.

  1. Application and development of technologies for engine-condition-based maintenance of emergency diesel generators

    SciTech Connect (OSTI)

    Choi, K. H.; Sang, G.; Choi, L. Y. S.; Lee, B. O. [Korea Hydro and Nuclear Power Company Central Research Institue, 70, 1312 -gil Yuseong-daero Yuseong-gu, Daejeon 305-343 (Korea, Republic of)

    2012-07-01T23:59:59.000Z

    The emergency diesel generator (EDG) of a nuclear power plant has the role of supplying emergency electric power to protect the reactor core system in the event of the loss of offsite power supply. Therefore, EDGs should be subject to periodic surveillance testing to verify their ability to supply specified frequencies and voltages at design power levels within a limited time. To maintain optimal reliability of EDGs, condition monitoring/diagnosis technologies must be developed. Changing from periodic disassemble maintenance to condition-based maintenance (CBM) according to predictions of equipment condition is recommended. In this paper, the development of diagnosis technology for CBM and the application of a diesel engine condition-analysis system are described. (authors)

  2. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-04-21T23:59:59.000Z

    The order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of structures, systems and components that are part of the safety basis required by 10 CFR 830.202 at hazard category 1, 2 and 3 DOE nuclear facilities. Admin Chg 1, dated 3-12-2013. Cancels DOE O 433.1A.

  3. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-04-21T23:59:59.000Z

    The order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of structures, systems and components that are part of the safety basis required by 10 CFR 830.202 at hazard category 1, 2 and 3 DOE nuclear facilities. Cancels DOE O 433.1A. Admin Chg 1, dated 3-12-2013, cancels DOE O 433.1B.

  4. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-02-13T23:59:59.000Z

    The Order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of Structures, Systems and Components (SSCs) that are part of the safety basis required by 10 CFR 830.202.1 at hazard category 1, 2 and 3 Department of Energy (DOE) nuclear facilities. Cancels DOE O 433.1. Canceled by DOE O 433.1B.

  5. Effects of dairy intake on weight maintenance

    E-Print Network [OSTI]

    Zemel, Michael B.; Donnelly, Joseph E.; Smith, Bryan K.; Sullivan, Debra K.; Richards, Joanna; Morgan-Hanusa, Danielle; Mayo, Matthew S.; Sun, Xiaocun; Cook-Wiens, Galen; Bailey, Bruce W.; Van Walleghen, Emily L.; Washburn, Richard A.

    2008-10-24T23:59:59.000Z

    . However, weight maintenance following successful weight loss is a critical component to the successful management of obesity, and although there are animal data to support the concept of calcium and dairy attenuation of weight and fat regain [23... or components of body composition. The premise of this investigation was that correction of dietary calcium and dairy insufficiency may attenuate weight regain following successful weight loss. Accord- ingly, it was important to have a clear comparison of inad...

  6. Onsite Wastewater Treatment Systems: Operation and Maintenance

    E-Print Network [OSTI]

    Lesikar, Bruce J.

    2008-10-23T23:59:59.000Z

    Soil absorption fieldTwo-compartment septic tank Perforated pipe for effluent disposal Sand/loam soil Gravel Geotextile fabric Onsite wastewater treatment systems Operation and maintenance L-5347 8-08 Figure 1: A septic tank and soil absorption... field system. I f your home or business uses an onsite wastewater treatment system, common- ly known as a septic system, you need to know how to operate and maintain the system properly to prevent pollution and sewage backups. For many years, people...

  7. Economics of Online Structural Health Monitoring of Wind Turbines: Cost Benefit Analysis

    E-Print Network [OSTI]

    McCalley, James D.

    Economics of Online Structural Health Monitoring of Wind Turbines: Cost Benefit Analysis Jeremy Van monitoring (OSHM) and condition-based maintenance (CBM) of wind turbine blades has the potential to reduce O cost of energy (LCOE) [1]. The costs required to keep wind turbines working in extreme temperatures

  8. The Interactive Routine as Key Construct in Theories of Interactive Behavior Wayne D. Gray (grayw@rpi.edu)

    E-Print Network [OSTI]

    Gray, Wayne

    The Interactive Routine as Key Construct in Theories of Interactive Behavior Wayne D. Gray (grayw together in dependency networks of constraints to form interactive routines (Gray, Sims, Fu, & Schoelles, 2006). Interactive behavior proceeds by selecting one interactive routine after another or by selecting

  9. Preventive maintenance vital to cogen profitability

    SciTech Connect (OSTI)

    Cox, D.R. (Mission Operation and Maintenance Inc. (US))

    1992-04-01T23:59:59.000Z

    A power plant's efficiency is the key to its success in generating a profit. While the fuel used and the mechanical efficiency of the plant itself are key design factor, once the plat is on-stream the main factor becomes the plant's time on line. Any downtime detracts from its profitability, especially during peak periods. In the case of a cogeneration facility downtime becomes even more critical, since it has more than one customer to satisfy; and electrical customer and a thermal energy customer. This paper reports that an unscheduled outage has the potential to be very expensive: Costs and revenue losses escalate rapidly from thousands of dollars into millions of dollars, depending on length of downtime and time of year. During off-peak winter months, losses at the Harbor cogeneration plant can be dramatic; peak summer losses can be catastrophic. Not only are generation revenues loss, but bonus revenues, qualifying facility (QF) status, and contractual obligations are at risk. With these prospects looming over the option, management must practice not only preventive maintenance, but predictive and condition based maintenance as well. HCC's key to preventing unscheduled outages is a computerized maintenance management system (CMMS).

  10. 2002 WIPP Environmental Monitoring Plan

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2002-09-30T23:59:59.000Z

    DOE Order 5400.1, General Environmental Protection Program, requires each DOE | facility to prepare an environmental management plan (EMP). This document is | prepared for WIPP in accordance with the guidance contained in DOE Order 5400.1; DOE Order 5400.5, Radiation Protection of the Public and Environment; applicable sections of Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T; DOE, 1991); and the Title 10 Code of Federal Regulations (CFR) Part 834, ''Radiation Protection of the Public and Environment'' (draft). Many sections of DOE Order 5400.1 have been replaced by DOE Order 231.1, which is the driver for the annual Site Environmental Report (SER) and the guidance source for preparing many environmental program documents. The WIPP Project is operated by Westinghouse TRU Solutions (WTS) for the DOE. This plan defines the extent and scope of WIPP's effluent and environmental | monitoring programs during the facility's operational life and also discusses WIPP's quality assurance/quality control (QA/QC) program as it relates to environmental monitoring. In addition, this plan provides a comprehensive description of environmental activities at WIPP including: A summary of environmental programs, including the status of environmental monitoring activities A description of the WIPP Project and its mission A description of the local environment, including demographics An overview of the methodology used to assess radiological consequences to the public, including brief discussions of potential exposure pathways, routine and accidental releases, and their consequences Responses to the requirements described in the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance.

  11. The Savannah River Site's Groundwater Monitoring Program

    SciTech Connect (OSTI)

    Not Available

    1989-01-01T23:59:59.000Z

    The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site's Groundwater Monitoring Program. During fourth quarter 1989 (October--December), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. An explanation of flagging criteria for the fourth quarter is presented in the Flagging Criteria section of this document. All analytical results from fourth quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

  12. Site Monitoring Area Maps

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to the Site Monitoring Area (SMA) The Site Monitoring Area sampler Control measures (best management practices) installed at the Site Monitoring Area Structures such as...

  13. Waste Sampling and Characterization Facility (WSCF). Maintenance Implementation Plan

    SciTech Connect (OSTI)

    Bozich, J.L.

    1993-07-01T23:59:59.000Z

    This Maintenance Implementation Plan has been developed for maintenance functions associated with the Waste Sampling and Characterization Facility (WSCF). This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4A, Maintenance Management Program (DOE 1990), Chapter II. The objective of this plan is to provide baseline information for establishing and identifying WHC conformance programs and policies applicable to implementation of DOE order 4330.4A guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at WSCF.

  14. Review of maintenance personnel practices at nuclear power plants

    SciTech Connect (OSTI)

    Chockie, A.D.; Badalamente, R.V.; Hostick, C.J.; Vickroy, S.C.; Bryant, J.L.; Imhoff, C.H.

    1984-05-01T23:59:59.000Z

    As part of the Nuclear Regulatory Commission (NRC) sponsored Maintenance Qualifications and Staffing Project, the Pacific Northwest Laboratory (PNL) has conducted a preliminary assessment of nuclear power plant (NPP) maintenance practices. As requested by the NRC, the following areas within the maintenance function were examined: personnel qualifications, maintenance training, overtime, shiftwork and staffing levels. The purpose of the assessment was to identify the primary safety-related problems that required further analysis before specific recommendations can be made on the regulations affecting NPP maintenance operations.

  15. Tritium monitor

    DOE Patents [OSTI]

    Chastagner, Philippe (Augusta, GA)

    1994-01-01T23:59:59.000Z

    A system for continuously monitoring the concentration of tritium in an aqueous stream. The system pumps a sample of the stream to magnesium-filled combustion tube which reduces the sample to extract hydrogen gas. The hydrogen gas is then sent to an isotope separation device where it is separated into two groups of isotopes: a first group of isotopes containing concentrations of deuterium and tritium, and a second group of isotopes having substantially no deuterium and tritium. The first group of isotopes containing concentrations of deuterium and tritium is then passed through a tritium detector that produces an output proportional to the concentration of tritium detected. Preferably, the detection system also includes the necessary automation and data collection equipment and instrumentation for continuously monitoring an aqueous stream.

  16. Tritium monitor

    DOE Patents [OSTI]

    Chastagner, P.

    1994-06-14T23:59:59.000Z

    A system is described for continuously monitoring the concentration of tritium in an aqueous stream. The system pumps a sample of the stream to magnesium-filled combustion tube which reduces the sample to extract hydrogen gas. The hydrogen gas is then sent to an isotope separation device where it is separated into two groups of isotopes: a first group of isotopes containing concentrations of deuterium and tritium, and a second group of isotopes having substantially no deuterium and tritium. The first group of isotopes containing concentrations of deuterium and tritium is then passed through a tritium detector that produces an output proportional to the concentration of tritium detected. Preferably, the detection system also includes the necessary automation and data collection equipment and instrumentation for continuously monitoring an aqueous stream. 1 fig.

  17. Designing a Bayesian Network for Preventive Maintenance from Expert Opinions in a Rapid

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Designing a Bayesian Network for Preventive Maintenance from Expert Opinions in a Rapid-Linear Model, Expert Opinion, Complexity Reduction, Maintenance. 1 Introduction Preventive maintenance became essential. Preventive maintenance of a system is taking into account expert knowledge, feedback

  18. Maintenance decision making tool reaching a compromise between maintainability and reliability performances

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    or scheduled preventive maintenance) to condition-based or predictive maintenance strategies preventive maintenance actions, in the sense that planned production stoppages within this temporal horizonMaintenance decision making tool reaching a compromise between maintainability and reliability

  19. Organizational Factors Impacting Implementation of Culturally Competent Care Modules in a Large Health Maintenance Organization

    E-Print Network [OSTI]

    Koh, Karen Leanne

    2011-01-01T23:59:59.000Z

    Modules in a Large Health Maintenance Organization By KarenModules in a Large Health Maintenance Organization Copyright

  20. Health Monitoring of Drive Connected Three-Phase Induction Motors ----- From Wired Towards Wireless Sensor Networks

    E-Print Network [OSTI]

    Xue, Xin

    2009-01-01T23:59:59.000Z

    maintenance 2) Preventive Maintenance 3) Condition-basedmaintenance or preventive maintenance) is to stop theMaintenance Preventive Maintenance Predictive Maintenance

  1. Using Signature Analysis for Maintenance Planning

    E-Print Network [OSTI]

    Babson, P. E.

    1979-01-01T23:59:59.000Z

    -25, 1979 From this survey, which we hold to be a typical representation of rotating machinery applications, it was concluded that vibration monitoring programs can be designed to produce a significant amount of machinery condition information... type, history, and ongoing in-house monitoring practices, the data points and frequency of surveillance are established (normally 1 or 2-month cycles with variations, e.g. critical ~achinery could be surveyed each month and peripheral machinery on a...

  2. The Savannah River Site's groundwater monitoring program

    SciTech Connect (OSTI)

    Not Available

    1991-05-06T23:59:59.000Z

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site's (SRS) Groundwater Monitoring Program. During third quarter 1990 (July through September) EPD/EMS conducted routine sampling of monitoring wells and drinking water locations. EPD/EMS established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead they aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. All analytical results from third quarter 1990 are listed in this report, which is distributed to all site custodians. One or more analytes exceeded Flag 2 in 87 monitoring well series. Analytes exceeded Flat 2 for the first since 1984 in 14 monitoring well series. In addition to groundwater monitoring, EPD/EMS collected drinking water samples from SRS drinking water systems supplied by wells. The drinking water samples were analyzed for radioactive constituents.

  3. Wind Turbine Drivetrain Condition Monitoring - An Overview (Presentation)

    SciTech Connect (OSTI)

    Sheng, S.; Yang, W.

    2013-07-01T23:59:59.000Z

    High operation and maintenance costs still hamper the development of the wind industry despite its quick growth worldwide. To reduce unscheduled downtime and avoid catastrophic failures of wind turbines and their components have been and will be crucial to further raise the competitiveness of wind power. Condition monitoring is one of the key tools for achieving such a goal. To enhance the research and development of advanced condition monitoring techniques dedicated to wind turbines, we present an overview of wind turbine condition monitoring, discuss current practices, point out existing challenges, and suggest possible solutions.

  4. Plant maintenance and outage management issue, 2005

    SciTech Connect (OSTI)

    Agnihotri, Newal (ed.)

    2005-01-15T23:59:59.000Z

    The focus of the January-February issue is on plant maintenance and outage managment. Major articles/reports in this issue include: Dawn of a new era, by Joe Colvin, Nuclear Energy Institute (NEI); Plant profile: Beloyarsk NPP, Russia, by Nikolai Oshkanov, Beloyarsk NPP, Russia; Improving economic performance, by R. Spiegelberg-Planner, John De Mella, and Marius Condu, IAEA; A model for improving performance, by Pet Karns, MRO Software; ASME codes and standards, by Shannon Burke, ASME International; and, Refurbishment programs, by Craig S. Irish, Nuclear Logistics, Inc.

  5. Plant maintenance and advanced reactors, 2006

    SciTech Connect (OSTI)

    Agnihotri, Newal (ed.)

    2006-09-15T23:59:59.000Z

    The focus of the September-October issue is on plant maintenance and advanced reactors. Major articles/reports in this issue include: Advanced plants to meet rising expectations, by John Cleveland, International Atomic Energy Agency, Vienna; A flexible and economic small reactor, by Mario D. Carelli and Bojan Petrovic, Westinghouse Electric Company; A simple and passively safe reactor, by Yury N. Kuznetsov, Research and Development Institute of Power Engineering (NIKIET), Russia; Gas-cooled reactors, by Jeffrey S. Merrifield, U.S. Nuclear Regulatory Commission; ISI project managment in the PRC, by Chen Chanbing, RINPO, China; and, Fort Calhoun refurbishment, by Sudesh Cambhir, Omaha Public Power District.

  6. CRAD, Maintenance Assessment Plan | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed offOCHCO OverviewAttachments EnergyFebruary 29CNG Exports by Truck out ofMaintenance Assessment Plan

  7. AN INNOVATIVE AND ELEGANTLY SIMPLE WAY TO DO SOMETHING FOR BLUEBIRDS (AND TAKE LITTLE TIME AWAY FROM TRANSPORTATION MAINTENANCE DUTIES)

    E-Print Network [OSTI]

    Kahn, Amy; Wicks, Jim Wicks

    2006-01-01T23:59:59.000Z

    FROM TRANSPORTATION MAINTENANCE DUTIES) Jim Wicks, Ontarioand are maintained by the maintenance sign crew with minimal

  8. Smart Structures and Materials & Nondestructive Evaluation and Health Monitoring; 17th Annual International symposium, 7-11 March 2010; San Diego, California USA

    E-Print Network [OSTI]

    Oza, Nikunj C.

    Smart Structures and Materials & Nondestructive Evaluation and Health Monitoring; 17th Annual International symposium, 7-11 March 2010; San Diego, California USA Propulsion Health Monitoring Of a Turbine companies in order to increase safety of operation and lower maintenance costs. Health monitoring remains

  9. Second Line of Defense Help Desk: Electronic Maintenance Reports - Local Maintenance Provider User Guide Rev. 1

    SciTech Connect (OSTI)

    Leigh, Richard J.

    2011-12-14T23:59:59.000Z

    The Electronic Maintenance Report forms present a uniform dataset for analysis of Sustainability metrics. These forms collect readily minable data while allowing the attachment of site-specific checklists or other supporting files for review by the Sustainability Manager and Program Management.

  10. Surface Magnetic Flux Maintenance In Quiet Sun

    E-Print Network [OSTI]

    Y. Iida

    2012-12-27T23:59:59.000Z

    We investigate surface processes of magnetic patches, namely merging, splitting, emergence, and cancellation, by using an auto-detection technique. We find that merging and splitting are locally predominant in the surface level, while the frequencies of the other two are less by one or two orders of magnitude. The frequency dependences on flux con- tent of surface processes are further investigated. Based on these observations, we discuss a possible whole picture of the maintenance. Our conclusion is that the photospheric magnetic field structure, especially its power-law nature, is maintained by the processes locally in the surface not by the interactions between different altitudes. We suggest a scenario of the flux maintenance as follows: The splitting and merging play a crucial role for the generation of the power-law distribution, not the emergence nor cancellation do. This power-law distribution results in another power-law one of the cancellation with an idea of the random convective transport. The cancellation and emergence have a common value for the power-law indices in their frequency distributions, which may suggest a "recycle of fluxes by submergence and re-emergence".

  11. TRUPACT-II Operating and Maintenance Instructions

    SciTech Connect (OSTI)

    Westinghouse Electric Corporation, Waste Isolation Division

    1999-12-31T23:59:59.000Z

    The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II) Shipping Package and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP) and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9218. In the event there is a conflict between this document and the TRUPACT-II SARP, the TRUPACT-II SARP shall govern. TRUPACT-II C of C number 9218 states, ''... each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application.'' It further states, ''... each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the application.'' Chapter 9 of the TRUPACT-II SARP charges the Westinghouse Electric Corporation Waste Isolation Division (WID) with assuring that the TRUPACT-II is used in accordance with the requirements of the C of C. To meet this requirement and verify consistency of operations when loading and unloading the TRUPACT-II on the trailer, placing a payload in the packaging, unloading the payload from the packaging, or performing maintenance, the U.S. Department of Energy Carlsbad Area Office (U.S. DOE/CAO) finds it necessary to implement the changes that follow. This TRUPACT-II maintenance document represents a change to previous philosophy regarding site specific procedures for the use of the TRUPACT-II. This document details the instructions to be followed to consistently operate and maintain the TRUPACT-II. The intent of these instructions is to ensure that all users of the TRUPACT-II follow the same or equivalent instructions. Users may achieve this intent by any of the following methods: (1) Utilizing these instructions as is, or (2) Attaching a site-specific cover page/letter to this document stating that these are the instructions to be used at their location, or (3) Sites may prepare their own document using the steps in this document word-for-word, in-sequence, including Notes and Cautions. Site specific information may be included as deemed necessary. Submit the document to WID National TRU Programs for approval. Any revision made subsequent to WID TRU Program's approval shall be reviewed and approved by WID TRU Programs. A copy of the approval letter from WID National TRU Programs should be available for audit purposes. Users shall develop site-specific procedures addressing leak testing, preoperational activities, quality assurance, hoisting and rigging, and radiation health physics to be used in conjunction with the instructions contained in this document. Users desiring to recommend changes to this document may submit their recommendations to the WID National TRU Programs for evaluation. If approved, the change(s) will be incorporated into this document for use by all TRUPACT-II users. User sites will be audited to this document to ensure compliance within one year from the effective date of this revision. This document discusses operating instructions, required inspections and maintenance for the following: TRUPACT-II packaging, and Miscellaneous packaging, special tools, and equipment. Packaging and payload handling equipment and transport trailers have been specifically designed for use with the TRUPACT-II Packaging. This document discusses the required instructions for use of the following equipment in conjunction with the TRUPACT-II Packaging: TRUPACT-II Mobile Loading Unit (MLU), Adjustable Center-of-Gravity Lift Fixture (ACGLF), and TRUPACT-II Transport Trailer. Attachment E contains the various TRUPACT-II packaging interface control drawings, leak-test and vent-port tool drawings, ACGLF drawings, and tie-down drawings that identify the various system components.

  12. analyzing maintenance strategies: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    utilisation and non-strategic importance of approximately 80% of the whole inventory the preventive maintenance service will be reduced to a minimum. In order to convert this...

  13. Article Published on LED Lumen Maintenance and Light Loss Factors...

    Broader source: Energy.gov (indexed) [DOE]

    of a comprehensive lifetime rating - as well as the problematic relationship between SSL lifetime and lumen maintenance - determining an appropriate LLD factor for LED products...

  14. ANNUAL MAINTENANCE AND LEAK TESTING FOR THE 9975 SHIPPING PACKAGE

    SciTech Connect (OSTI)

    Trapp, D.

    2014-08-25T23:59:59.000Z

    The purpose of this document is to provide step-by-step instructions for the annual helium leak test certification and maintenance of the 9975 Shipping Package.

  15. Fermilab | Director's Policy Manual | No. 5.000 Maintenance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    will include a budget and schedule, and a mechanism for tracking equipment failure. A program for preventive and predictive maintenance should also be developed if appropriate...

  16. Joint Maintenance Status Report of Potomac Electric Power Company...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    amd PJM Interconnection, LLC Docket No. EO-05-01: Potomac Electric Power Company ("Pepco") and PJM Interconnection, L.L.C. ("PJM") hereby jointly submit this Maintenance...

  17. Technology Management Routines That Matter to Technology Managers Daniel Z. Levin

    E-Print Network [OSTI]

    Lin, Xiaodong

    Technology Management Routines That Matter to Technology Managers Daniel Z. Levin Management South Africa barnardh@gibs.co.za International Journal of Technology Management, Vol. 41, Nos. 1/2, 2008, pp. 22-37 ABSTRACT This study addresses the fragmentation in the technology management field

  18. A Set of Conjugate Gradient Routines for Real and Complex Arithmetics

    E-Print Network [OSTI]

    The Conjugate Gradient method was proposed in different versions in the early 50s in separate contributionsA Set of Conjugate Gradient Routines for Real and Complex Arithmetics Val´erie Frayss´e Luc Giraud of the preconditioned conjugate gradient (CG) algorithm for both real and complex, single and double precision

  19. Routine based OS-aware Microprocessor Resource Adaptation for Run-time Operating System Power Saving

    E-Print Network [OSTI]

    John, Lizy Kurian

    workloads (see section 2 for detail), making it a major power consumer. The proportion of the OS power, such as thermal sensor reading, energy accounting and power control for memory and I/O devices [2]. ClearlyRoutine based OS-aware Microprocessor Resource Adaptation for Run-time Operating System Power

  20. E04 Minimizing or Maximizing a Function E04UPF NAG Fortran Library Routine Document

    E-Print Network [OSTI]

    Jones, Alan G.

    E04 ­ Minimizing or Maximizing a Function E04UPF ­ NAG Fortran Library Routine Document Note at Mark 16. 1 Purpose E04UPF is designed to minimize an arbitrary smooth sum of squares function subject. It is not intended for large sparse problems. E04UPF may also be used for unconstrained, bound

  1. Insulation condition monitoring and testing for large electrical machines

    SciTech Connect (OSTI)

    Zhou, Y.; Dix, G.I.; Quaife, P.W. [Industrial Research Ltd., Christchurch (New Zealand)

    1996-12-31T23:59:59.000Z

    An efficient method to assess the insulation condition of rotating machines is on-line partial discharge monitoring. Difficulties in on-line monitoring result from various noise sources associated with the machine and from the power system. The paper introduces and discusses the theories, different testing techniques and monitoring methods currently used by Industrial Research Limited and other laboratories. The design and testing of high frequency current transformers for partial discharge on-line monitoring are introduced. Laboratory and field tests on electrical machines are presented. A database has been developed for efficient insulation monitoring and maintenance. The database allows intra and inter comparisons of partial discharge, tan delta, capacitance between phases in a machine and with other machines easily. The functions of the database enhance the efficiency and provide more information for effective insulation condition assessment.

  2. Systems engineering approach towards performance monitoring of emergency diesel generator

    SciTech Connect (OSTI)

    Ramli, Nurhayati, E-mail: nurhayati14@gmail.com; Yong-kwan, Lee, E-mail: nurhayati14@gmail.com [KEPCO International Nuclear Graduate School, 1456-1 Shinam-ri, Ulsan 689-882 (Korea, Republic of)

    2014-02-12T23:59:59.000Z

    Systems engineering is an interdisciplinary approach and means to enable the realization of successful systems. In this study, systems engineering approach towards the performance monitoring of Emergency Diesel Generator (EDG) is presented. Performance monitoring is part and parcel of predictive maintenance where the systems and components conditions can be detected before they result into failures. In an effort to identify the proposal for addressing performance monitoring, the EDG boundary has been defined. Based on the Probabilistic Safety Analysis (PSA) results and industry operating experiences, the most critical component is identified. This paper proposed a systems engineering concept development framework towards EDG performance monitoring. The expected output of this study is that the EDG reliability can be improved by the performance monitoring alternatives through the systems engineering concept development effort.

  3. Contract and beyond GEMnet status and accomplishments: GSA's energy and maintenance network

    SciTech Connect (OSTI)

    Piette, Mary Ann; Kinney, Satkartar; Levi, Mark; McBride, David; May, Stephen

    2002-05-01T23:59:59.000Z

    The U.S. General Services Administration Pacific Rim Region (Region 9), manages over 20 million gross square feet of federally owned office space, plus additional leased office space, for the federal government in California, Nevada, Arizona, Hawaii and the Pacific territories. To assist in this real estate management the Pacific Rim Region is developing the GSA Energy and Maintenance Network, or GEMnet. GEMnet is a collection of information technology initiatives, including remote monitoring and control to reduce operational costs by improving energy efficiency, reducing peak demand, and optimizing maintenance in buildings. Ultimately the various systems use a common database platform. This paper describes the status and plans for GEMnet, focusing on how it compares with related monitoring and information technology currently used in nonresidential buildings. This paper will also report on recent activities within the GEMnet purview, demand-shedding and retro-commissioning. For example, two large GSA office buildings in the San Francisco Bay Area participated in the California Independent System Operator (ISO) demand relief program (DRP) during the summer of 2001, shedding nearly 1 MW when called upon. In conjunction with the fielding of GEMnet related programs, a series of retro-commissioning projects is being implemented, scoped to the needs of particular buildings. Details on the BAS retro-commissioning at one building is presented.

  4. Preventative maintenance plan for emergency pumping trailers

    SciTech Connect (OSTI)

    Wiggins, D.D.

    1994-09-01T23:59:59.000Z

    The purpose/goal of this document is to identify the maintenance requirements and resources available to properly maintain the readiness and condition of the Emergency Pumping Equipment controlled by the Tank Waste Remediation System Tank Farms Plant Engineering and Tank Stabilization Operations. This equipment is intended to pump a single-shell tank (SST) that has been identified as an assumed leaking tank. The goal is to commence pumping (submersible or jet) as soon as safely possible after identifying a SST as an assumed leaking tank. Important information pertaining to the Emergency Pumping Equipment, Over-Ground Piping installation, and procedures is found in WHC-SD-WM-AP-005, ``Single Shell Tank Leak Emergency Pumping Guide.``

  5. Journal of Quality in Maintenance Engineering

    E-Print Network [OSTI]

    Ghouti, Lahouari

    Limited 1355-2511 DOI 10.1108/13552510310482398 Experiments on the extraction of blade vibration signature. Abdlsamad King Fahd University of Petroleum & Minerals, Dhahran, Saudi Arabia Keywords Vibration, Condition monitoring, Torsion, Signal processing Abstract This paper presents experimental results that examine

  6. A Comparison of Parallel Programming Paradigms and Data Distributions for a Limited Area Numerical Weather Forecast Routine

    E-Print Network [OSTI]

    van Engelen, Robert A.

    . Published in proceedings of the 9 th ACM International Conference on Supercomputing, July 1995, Barcelona for producing routine weather forecasts at several European meteorological institutes. Results are shown

  7. Annual summary report on the surveillance and maintenence plan for Waste Area Groupings at Oak Ridge National Laboratory for period ending September 30, 1992

    SciTech Connect (OSTI)

    Ford, M.K.; Holder, L. Jr.; Jones, R.G.

    1992-11-01T23:59:59.000Z

    Surveillance and maintenance (S M) of 75 sites was conducted by the Remedial Action Section for the Environmental Restoration Program for surplus facilities and sites contaminated with radioactive materials and/or hazardous chemicals at Oak Ridge National Laboratory. S M activities on these facilities and sites was started at the end of their operating life and will continue until final facility disposal or site stabilization. The objectives of the Waste Area Grouping S M Program are met by maintaining a program of routine S M as well as by implementing interim corrective maintenance when deemed necessary as a result of site surveillance. This report briefly presents this program's activities and includes tables indicating tank levels and dry well data for FY 1992.

  8. Annual summary report on the surveillance and maintenence plan for Waste Area Groupings at Oak Ridge National Laboratory for period ending September 30, 1992. Environmental Restoration Program

    SciTech Connect (OSTI)

    Ford, M.K.; Holder, L. Jr.; Jones, R.G.

    1992-11-01T23:59:59.000Z

    Surveillance and maintenance (S&M) of 75 sites was conducted by the Remedial Action Section for the Environmental Restoration Program for surplus facilities and sites contaminated with radioactive materials and/or hazardous chemicals at Oak Ridge National Laboratory. S&M activities on these facilities and sites was started at the end of their operating life and will continue until final facility disposal or site stabilization. The objectives of the Waste Area Grouping S&M Program are met by maintaining a program of routine S&M as well as by implementing interim corrective maintenance when deemed necessary as a result of site surveillance. This report briefly presents this program`s activities and includes tables indicating tank levels and dry well data for FY 1992.

  9. Variability in continuous traffic monitoring data

    SciTech Connect (OSTI)

    Wright, T.; Hu, P.S. [Oak Ridge National Lab., TN (United States); Young, J. [Tennessee Univ., Knoxville, TN (United States)

    1996-07-01T23:59:59.000Z

    Each state in the United States can be viewed as a universe of road segments. For each road segment in each state, it is desired to know various traffic characteristics based on count data, classification count data, and weigh-in-motion data. These data are absolutely essential for highway design, maintenance, safety, and planning. Given no cost constraints, each road segment would be continuously monitored every day of the year. However, in practice, a few road segments are monitored continuously every day of the year to produce annual characteristics of traffic flow. The remaining road segments are monitored for one or two days each year, and this resulting data are `adjusted` (using factors based on data collected from the continuously monitored road segments) to produce estimates of annual characteristics. With this general approach, each state strives to provide estimates of annual characteristics for each road segment within its jurisdiction. In 1985, the Federal Highway Administration (FHWA) published the Traffic Monitoring Guide to assist states in achieving this end. As with almost any data collection effort, the monitoring data suffers from errors from many sources. In this paper, we report some empirical findings in a research project sponsored by the FHWA. This research project studied the variability in the traffic data from the continuously monitored road segments from state(s) and, the extent to which this variability is transferred to and affects the precision of the data produced from the road segments which are monitored only one or two days each year. The ultimate hope is that states will eventually be able to not only publish an estimate of a characteristic such as Average Annual Daily Traffic (AADT) for each road segment, but also that each estimate will be accompanied by a statement expressing how good the estimate is in terms of its estimated variability or precision, which will likely be expressed as a coefficient of variation.

  10. STANDARD OPERATING PROCEDURES Sampler Maintenance by Site Operators

    E-Print Network [OSTI]

    Fischer, Emily V.

    IMPROVE STANDARD OPERATING PROCEDURES SOP 201 Sampler Maintenance by Site Operators Date Last.0 PURPOSE AND APPLICABILITY This standard operating procedure (SOP) describes the procedures and schedules. The procedural steps for weekly maintenance and repairs performed by the site operator are included in TI 201A

  11. P\\procedure\\UAVP#20 EMERGENCY BLUE LIGHTS PLACEMENTS & MAINTENANCE

    E-Print Network [OSTI]

    Fernandez, Eduardo

    P\\procedure\\UAVP#20 TITLE: EMERGENCY BLUE LIGHTS ­ PLACEMENTS & MAINTENANCE OBJECTIVE AND PURPOSE: To establish a policy for the installation of new emergency blue lights and the maintenance of existing emergency blue lights. Objective include: Provide adequate emergency blue lights throughout campus. Ensure

  12. 05.01 1 Budget Maintenance and Development REGENTS' POLICY

    E-Print Network [OSTI]

    Pantaleone, Jim

    05.01 1 Budget Maintenance and Development REGENTS' POLICY PART V ­ FINANCE AND BUSINESS MANAGEMENT Chapter 05.01 - Budget Development and Maintenance P05.01.010. Budget Policy. A. The budget by their respective annually adopted budgets and approved amendments, in accordance with procedure established

  13. Molecular Cell Apollo Contributes to G Overhang Maintenance

    E-Print Network [OSTI]

    de Lange, Titia

    Molecular Cell Article Apollo Contributes to G Overhang Maintenance and Protects Leading to mediate telomere protec- tion. Here we identify the TRF2-interacting factor Apollo as a nuclease that contributes to the genera- tion/maintenance of this overhang. The function of mouse Apollo was determined

  14. MONITORING AND CONTROL OF UREX RADIOCHEMICAL PROCESSES

    SciTech Connect (OSTI)

    Bryan, Samuel A.; Levitskaia, Tatiana G.

    2007-07-01T23:59:59.000Z

    There is urgent need for methods to provide on-line monitoring and control of the radiochemical processes that are currently being developed and demonstrated under the Global Nuclear Energy Partnership (GNEP) initiative. The methods used to monitor these processes must be robust (require little or no maintenance) and must be able to withstand harsh environments (e.g., high radiation fields and aggressive chemical matrices). The ability for continuous online monitoring allows the following benefits: • Accountability of the fissile materials; • Control of the process flowsheet; • Information on flow parameters, solution composition, and chemical speciation; • Enhanced performance by eliminating the need for traditional analytical “grab samples”; • Improvement of operational and criticality safety; • Elimination of human error. The objective of our project is to use a system of flow, chemical composition, and physical property measurement techniques for developing on-line real-time monitoring systems for the UREX process streams. We will use our past experience in adapting and deploying Raman spectrometer combined with Coriolis meters and conductivity probes in developing a deployable prototype monitor for the UREX radiochemical streams. This system will be augmented with UV-vis-NIR spectrophotomter. Flow, temperature, density, and chemical composition and concentration measurements will be combined for real-time data analysis during processing. Currently emphasis of our research is placed on evaluation of the commercial instrumentation for the UREX flowsheet.

  15. 1984 power plant performance monitoring workshop: proceedings

    SciTech Connect (OSTI)

    Not Available

    1986-05-01T23:59:59.000Z

    An EPRI workshop on fossil plant performance monitoring and improvement was conducted in Washington, DC, October 23-25, 1984. The main theme of the workshop was the EPRI-PEPCo performance monitoring project (EPRI projects RP1681 and RP2153) highlighted in the opening session. The objective of this project is to develop an advanced instrumentation and monitoring system to improve heat rate, recover lost capacity, optimize system dispatch, and plan maintenance more effectively. Interim results of this project, which can now be used by the utility industry, were emphasized in the presentations including (1) the boiler parametric analysis program for optimizing boiler combustion efficiency and (2) the N2 packing monitor that measures the steam leakage from the high-pressure to the intermediate-pressure turbine. Other EPRI projects, such as RP1711-2 and RP1878-1, were also highlighted. RP1711-2 employs root-cause investigation techniques to trace plant heat-rate degradation problems and recommend cost-effective solutions, while RP1878-1 introduces a nonradioactive tracer technique to monitor turbine efficiency. Twenty-seven papers have been entered individually into EDB and ERA. Section 6 - working group minutes - was not entered by itself. (LTN)

  16. Use of Continuous Integration Tools for Application Performance Monitoring

    SciTech Connect (OSTI)

    Vergara Larrea, Veronica G [ORNL; Joubert, Wayne [ORNL; Fuson, Christopher B [ORNL

    2015-01-01T23:59:59.000Z

    High performance computing systems are becom- ing increasingly complex, both in node architecture and in the multiple layers of software stack required to compile and run applications. As a consequence, the likelihood is increasing for application performance regressions to occur as a result of routine upgrades of system software components which interact in complex ways. The purpose of this study is to evaluate the effectiveness of continuous integration tools for application performance monitoring on HPC systems. In addition, this paper also describes a prototype system for application perfor- mance monitoring based on Jenkins, a Java-based continuous integration tool. The monitoring system described leverages several features in Jenkins to track application performance results over time. Preliminary results and lessons learned from monitoring applications on Cray systems at the Oak Ridge Leadership Computing Facility are presented.

  17. Routine environmental audit of the K-25 Site, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1994-02-01T23:59:59.000Z

    This report documents the results of the Routine Environmental Audit of the K-25 Site in Oak Ridge, Tennessee, conducted February 14 through February 25, 1994, by the US Department of Energy`s (DOE`s) Office of Environmental Audit (EH-24) located within the Office of Environment, Safety and Health (EH). The Routine Environmental Audit for the K-25 site was conducted as an environmental management assessment, supported through reviews of the Waste Management Program and the Decontamination and Decommissioning Program. The assessment was conducted jointly with, and built upon, the results provided by the ``DOE Oak Ridge Operations Office Environment, Safety, health and Quality Assurance Appraisal at the K-25 Site.`` DOE 5482.1B, ``Environment, Safety and Health Appraisal Program,`` established the mission of EH-24 to provide comprehensive, independent oversight of Department-wide environmental programs on behalf of the Secretary of Energy. The purpose of this assessment is to provide the Secretary of Energy and senior DOE managers with concise independent information as part of DOE`s continuing effort to improve environmental program performance. The ultimate goal of EH-24 is enhancement of environmental protection and the minimization of risk to public health and the environment. The routine environmental audit is one method by which EH-24 accomplishes its mission, utilizing systematic and periodic evaluations of the Department`s environmental programs within line organizations.

  18. The Gascon Énonciatif System: Past, Present, and Future. A study of language contact, change, endangerment, and maintenance

    E-Print Network [OSTI]

    Marcus, Nicole

    2010-01-01T23:59:59.000Z

    change, endangerment, and maintenance by Nicole Elise Marcuschange, endangerment, and maintenance by Nicole Elise Marcuschange, endangerment, and maintenance by Nicole Elise Marcus

  19. The Gascon Énonciatif System: Past, Present, and Future, A Study of Language Contact, Change, Endangerment, and Maintenance

    E-Print Network [OSTI]

    Marcus, Nicole

    2010-01-01T23:59:59.000Z

    currently existing language maintenance projects, I am veryto further language maintenance projects, which is anythingis crucial to language maintenance and survival. Many Gascon

  20. Electroencephalography correlates of spatial working memory deficits in attention-deficit/hyperactivity disorder: Vigilance, encoding, and maintenance

    E-Print Network [OSTI]

    2014-01-01T23:59:59.000Z

    CG, Cannon TD (2002) Maintenance and manipulation in spatialVigilance, Encoding, and Maintenance Agatha Lenartowicz, 1,2encoding and maintenance) that may be differentially

  1. Partnership Status, Continued Drug Use and Treatment Adherence among Newly Enrolled Methadone Maintenance Therapy Patients in China

    E-Print Network [OSTI]

    Wan, Dai

    2012-01-01T23:59:59.000Z

    of outpatients in methadone maintenance treatment clinics.of first eight methadone maintenance treatment clinics inLangrod J. , Methadone maintenance treatment (MMT): a review

  2. Facilitators of and Barriers to Methadone Maintenance Treatment Enrollment among Opioid Injecting Drug Users in Hai Phong, Vietnam, 2011

    E-Print Network [OSTI]

    Nguyen, Nguyen Binh

    2012-01-01T23:59:59.000Z

    of methadone maintenance therapy ……………………. ……..….. 1.4. TheBarriers to Methadone Maintenance Enrollment among OpioidUsers and Methadone Maintenance Enrollment in Hai Phong,

  3. Hyphal Development in Candida albicans Requires Two Temporally Linked Changes in Promoter Chromatin for Initiation and Maintenance

    E-Print Network [OSTI]

    Lu, Yang; Su, Chang; Wang, Allen; Liu, Haoping; Heitman, Joseph

    2011-01-01T23:59:59.000Z

    Chromatin for Initiation and Maintenance Yang Lu, Chang Su,cAMP-PKA pathway. Maintenance requires promoter recruitmentof Hda1 for hyphal maintenance happens only during the

  4. Maintenance of Parent Strategies is Associated with Pre-Treatment Parent Fidelity, Treatment Assignment, and Post Treatment Community Services

    E-Print Network [OSTI]

    Fuller, Amy

    2013-01-01T23:59:59.000Z

    California Los Angeles Maintenance of Parent Strategies isOF THE DISSERTATION Maintenance of Parent Strategies isof early interventions, maintenance of taught strategies may

  5. Sustained activation of STAT5 is essential for chromatin remodeling and maintenance of mammary-specific function

    E-Print Network [OSTI]

    Xu, Ren

    2010-01-01T23:59:59.000Z

    Impaired alveologenesis and maintenance of secretory mammaryfor chromatin remodeling and maintenance of mammary-specifictissue architecture in maintenance of transcription factor

  6. Espiritualismo at the U.S.-Mexican Border: A Case Study of Possession, Globalization, and the Maintenance of Tradition

    E-Print Network [OSTI]

    Otero, Rodolfo Alberto

    2010-01-01T23:59:59.000Z

    Globalization, and the Maintenance of Tradition AGlobalization, and the Maintenance of Tradition by Rodolfothe religious movement. The maintenance of equal relations

  7. Activation of Egf-r/ERK by rhomboid signaling regulates the consolidation and maintenance of sleep in Drosophila

    E-Print Network [OSTI]

    Foltenyi, Krisztina

    2006-01-01T23:59:59.000Z

    the consolidation and maintenance of sleep in Drosophila.the consolidation and maintenance of sleep in Drosophila.the consolidation and maintenance of sleep in Drosophila.

  8. Referring heroin users from compulsory detoxification centers to community methadone maintenance treatment: a comparison of three models

    E-Print Network [OSTI]

    2013-01-01T23:59:59.000Z

    to community methadone maintenance treatment: a comparisonefficacy of methadone maintenance interventions in reducingLynch F: Methadone maintenance and the cost and utilization

  9. Idaho National Laboratory Cultural Resource Monitoring Report for 2013

    SciTech Connect (OSTI)

    Julie B. Williams; Brenda Pace

    2013-10-01T23:59:59.000Z

    This report describes the cultural resource monitoring activities of the Idaho National Laboratory’s (INL) Cultural Resource Management (CRM) Office during 2013. Throughout the year, thirty-eight cultural resource localities were revisited including: two locations with Native American human remains, one of which is also a cave; fourteen additional caves; seven prehistoric archaeological sites ; four historic archaeological sites; one historic trail; one nuclear resource (Experimental Breeder Reactor-I, a designated National Historic Landmark); and nine historic structures located at the Central Facilities Area. Of the monitored resources, thirty-three were routinely monitored, and five were monitored to assess project compliance with cultural resource recommendations along with the effects of ongoing project activities. On six occasions, ground disturbing activities within the boundaries of the Power Burst Facility/Critical Infrastructure Test Range Complex (PBF/CITRC) were observed by INL CRM staff prepared to respond to any additional finds of Native American human remains. In addition, two resources were visited more than once as part of the routine monitoring schedule or to monitor for additional damage. Throughout the year, most of the cultural resources monitored had no visual adverse changes resulting in Type 1determinations. However, Type 2 impacts were noted at eight sites, indicating that although impacts were noted or that a project was operating outside of culturally cleared limitations, cultural resources retained integrity and noted impacts did not threaten National Register eligibility. No new Type 3 or any Type 4 impacts that adversely impacted cultural resources and threatened National Register eligibility were observed at cultural resources monitored in 2013.

  10. Maintenance implementation plan for B Plant

    SciTech Connect (OSTI)

    Tritt, S.E.

    1992-06-01T23:59:59.000Z

    The B Plant facility, is located in the 200 East Area at the Hanford Site in south-central Washington State. It consists of two major operating areas: the B Plant Canyon Building, and the Waste Encapsulation and Storage Facility (WESF). The B Plant was originally designed to chemically process spent nuclear fuels. After this initial mission was completed, the plant was modified to provide for the separation of strontium and cesium, individually, from the fission productwaste stream following plutonium and uranium recovery from irradiated reactor fuels in the Plutonium-Uranium Extraction Plant (PUREX). The recovered, purified, and concentrated strontium and cesium solutions were then transferred to the WESF for conversion to solid compounds, encapsulation, and interim storage. After strontium and cesium removal, the remaining waste was transferred from B Plant to tank farms. B Plantis an operating facility that is required to ensure safe storage And management of the WESF cesium and strontium capsules, as well as a substantial radiological inventory remaining in the plant from previous campaigns. There are currently no production activities at B Plant, but several operating systems are required to accomplish the current B Plant mission.B Plant receives and stores various chemicals from commercial suppliers for treatment of low-level waste generated at WESF and B Plant, generation of demineralized water, and conditioning of water used in heating, ventilation, and air conditioning units. This report describes the maintenance of B Plant, including personnel training and schedules.

  11. Factors important for the establishment and maintenance of HIV-1 latency in CD4 T cells

    E-Print Network [OSTI]

    Soto, Paula Campos

    2008-01-01T23:59:59.000Z

    the Establishment and Maintenance of HIV-1 Latency in CD4 TFunction, generation, and maintenance. Annu Rev Immunol. 19.the Establishment and Maintenance of HIV-1 Latency in CD4 T

  12. Maintenance of Open Chromatin States by Histone H3 Eviction and H2A.Z

    E-Print Network [OSTI]

    Lombardi, Laura

    2011-01-01T23:59:59.000Z

    Maintenance of Open Chromatin States by Histone H3 EvictionFischer Spring 2011 Maintenance of Open Chromatin States byMarie Lombardi Abstract Maintenance of Open Chromatin States

  13. Functional Characterization of Kansl2 and Its Role in Mitochondrial DNA Repair and Maintenance

    E-Print Network [OSTI]

    Liau, Wei-Siang

    2012-01-01T23:59:59.000Z

    understanding of the maintenance and repair of the mtDNA,A is necessary for mtDNA maintenance and embryogenesis in1997). Mitochondrial DNA maintenance in vertebrates. Annu

  14. Tradeoffs between time allocations to maintenance activities/travel and discretionary activities/travel

    E-Print Network [OSTI]

    Chen, Cynthia Q; Mokhtarian, Patricia L

    2006-01-01T23:59:59.000Z

    Time Allocations to Maintenance Activities/Travel andShare of Time Spent on Maintenance Activities/Travel (w m )Elasticity of Time Spent on Maintenance Activities, as a

  15. PLZF Regulates Fibroblast Growth Factor Responsiveness and Maintenance of Neural Progenitors

    E-Print Network [OSTI]

    Gaber, ZB; Butler, SJ; Novitch, BG

    2013-01-01T23:59:59.000Z

    and FGFR3 promote NPC maintenance The author(s) have madecharacter and progenitor maintenance in the CNS. Neuron 74:FGFR3 Levels and NPC Maintenance 10. Saarimaki-Vire J,

  16. Maintenance of certification and the financial status of the medical boards

    E-Print Network [OSTI]

    Lieberman, Miriam R.; Siegel, Daniel M.

    2015-01-01T23:59:59.000Z

    H, Phy M, Nugent K. Maintenance of certification in Internalpdf/f990.pdf . ) 7. "ABMS Maintenance of Certification®."ABMS Maintenance of Certification®. N.p. , n.d. Web. (

  17. If your codes run much slower than before the maintenance on...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    codes run much slower after the maintenance on 62514 If your codes hang or run much slower after the maintenance on 62514 June 27, 2014 (0 Comments) During the maintenance on...

  18. An Integrated ACO Approach for the Joint Production and Preventive Maintenance Scheduling

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    An Integrated ACO Approach for the Joint Production and Preventive Maintenance Scheduling Problem, an integrated ACO approach to solve joint production and preventive maintenance scheduling problem very effective solutions for this problem. Key words-- ACO, Production, Preventive maintenance

  19. Predictive maintenance policy for a gradually deteriorating system subject to stress

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    of optimal maintenance strategies for improving system availability, preventing Preprint submitted and preventive. Preventive maintenance itself can be categorized into two classes: systematic preventive preventive maintenance policies based on the a priori statistical knowledge of the system lifetime [3]. CBM

  20. Optimization of Preventive Maintenance Scheduling in Semiconductor Manufacturing Models Using a Simulation-Based Approximate

    E-Print Network [OSTI]

    Fernandez, Emmanuel

    Optimization of Preventive Maintenance Scheduling in Semiconductor Manufacturing Models Using Dynamic Programming (ADP) approach for the optimization of Preventive Maintenance (PM) scheduling schedules. I. INTRODUCTION In semiconductor manufacturing systems, or fabs, pre- ventive maintenance (PM

  1. CBM processes are applicable to maintenance activities on complex systems. Southwest Research Institute

    E-Print Network [OSTI]

    Chapman, Clark R.

    performance costs, and preventive/ scheduled maintenance replaces parts before the end of their useful life optimizes costs between preventive and corrective maintenance. Preventive Condition Number of FailuresCBM processes are applicable to maintenance activities on complex systems. Southwest Research

  2. Probabilistic evaluation of the sustainability of maintenance strategies for RC structures exposed to chloride ingress

    E-Print Network [OSTI]

    Boyer, Edmond

    is proposed. Keywords: reinforced concrete, sustainability, corrosion, maintenance, reliability. hal-00796729, to guarantee optimum levels of serviceability and safety during the life-cycle, maintenance planning1 Probabilistic evaluation of the sustainability of maintenance strategies for RC structures

  3. Uncertainties in Achieving Energy Savings from HVAC Maintenance Measures in the Field

    E-Print Network [OSTI]

    California at Davis, University of

    Uncertainties in Achieving Energy Savings from HVAC Maintenance Measures in the Field Kristin Group, Davis, CA, USA 4 Southern California Edison, Irwindale, CA, USA ABSTRACT HVAC maintenance utilities across the nation to include HVAC maintenance measures in energy efficiency programs

  4. Attachment A Operations and Maintenance Master Plan

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA group currentBradleyTableSelling7111A Lithologic and Monitor WellAshtabula, Ohio,

  5. Composition monitoring of electron beam melting processes using diode lasers

    SciTech Connect (OSTI)

    Berzins, L.V.

    1991-11-20T23:59:59.000Z

    Electron beam melting processes are used to produce high purity alloys for a wide range of applications. Real time monitoring of the alloy constituents, however, has historically been difficult. Absorption spectroscopy using diode lasers provides a means for measuring constituent densities, and hence alloy composition, in real time. Diode lasers are suggested because they are inexpensive and require little maintenance. There is increasing interest in the composition and quality control of titanium alloys used in aircraft parts. For this reason we describe a proposed system for composition monitoring of titanium alloys. Performance and cost of the proposed system is addressed. We discuss the applicability of this approach to other alloys.

  6. FAciLity mAintenAnce College of Rural and Community Development

    E-Print Network [OSTI]

    Hartman, Chris

    maintenance trends and developing strate- gies for future maintenance needs. Occupational endorsement Program--Troubleshooting HVAC Systems......................................2 CTT F151--Introduction to Plumbing Tools

  7. Survey of Companies in Machine Health Monitoring and Maintenance Company Capability Software Application Modeling Technique

    E-Print Network [OSTI]

    Huang, Samuel H.

    software · Paper · Food · Steel · Petrochemical industries NO MODELING AssetPoint www.tabware.com · Data acquisition and open systems storage · Enterprise Asset Management Tabware (CMMS application) · Petrochemical

  8. HP Steam Trap Monitoring

    E-Print Network [OSTI]

    Pascone, S.

    2011-01-01T23:59:59.000Z

    STEAM MONITORING HP Steam Trap Monitoring HP Steam Trap Monitoring ? 12-18 months payback! ? 3-5% permanent reduction in consumption ? LEED Pt.? Innovation in Operations EB O&M ? Saved clients over $1,000,000 Annual consumption... Steam Trap Monitoring ? Real-time monitoring for high-pressure critical traps (>15 PSIG) ? Average total system cost $25K - $50K ? Web-Based or Modbus/BMS Integration Basic Installation Wireless Signal Transmitter Receiver Repeater...

  9. 2003 Long-Term Surveillance and Maintenance Program Report

    SciTech Connect (OSTI)

    None

    2004-07-01T23:59:59.000Z

    Radioactive waste was created by the Federal Government and private industry at locations around the country in support of national defense, research, and civilian power-generation programs. If not controlled, much of this legacy waste would remain hazardous to human health and the environment indefinitely. Current technology does not allow us to render this waste harmless, so the available methods to control risk rely on consolidation, isolation, and long-term management of the waste. The U.S. Department of Energy (DOE) has an obligation to safely control the radioactive waste and to inform and train future generations to maintain and, perhaps, improve established protections. DOE is custodian for much of the radioactive and other hazardous waste under control of the Federal Government. DOE established the Formerly Utilized Sites Remedial Action Program (FUSRAP) in 1974 and the Defense Decontamination and Decommissioning (D&D) Program and the Surplus Facilities Management Program in the 1980s. Congress passed the Uranium Mill Tailings Radiation Control Act (UMTRCA) in 1978. These federal programs and legislation were established to identify, remediate, and manage legacy waste. Remedial action is considered complete at a radioactive waste site when the identified hazardous material is isolated and the selected remedial action remedy is in place and functioning. Radioactive or other hazardous materials remain in place as part of the remedy at many DOE sites. Long-term management of radioactive waste sites incorporates a set of actions necessary to maintain protection of human health and the environment. These actions include maintaining physical impoundment structures in good repair to ensure that they perform as designed, preventing exposure to the wastes by maintaining access restrictions and warnings, and recording site conditions and activities for future custodians. Any actions, therefore, that will prevent exposure to the radioactive waste now or in the future are part of long-term site management. In response to post-closure care requirements set forth in UMTRCA, DOE Headquarters established the Long-Term Surveillance and Maintenance (LTS&M) Program in 1988 at the DOE office in Grand Junction, Colorado. The program assumed long-term management responsibility for sites remediated under UMTRCA and other programs. Since its inception, the LTS&M Program has evolved in response to changing stakeholder needs, improvements in technology, and the addition of more DOE sites as remediation is completed. The mission of the LTS&M Program was to fulfill DOE’s responsibility to implement all activities necessary to ensure regulatory compliance and to protect the public and the environment from long-lived wastes associated with the nation’s nuclear energy, weapons, and research activities. Key components of the LTS&M Program included stakeholder participation, site monitoring and maintenance, records and information management, and research and technology transfer. This report presents summaries of activities conducted in 2003 in fulfillment of the LTS&M Program mission. On December 15, 2003, DOE established the Office of Legacy Management (LM) to allow for optimum management of DOE’s legacy responsibilities. Offices are located in Washington, DC, Grand Junction, Colorado, Morgantown, West Virginia, and Pittsburgh, Pennsylvania, to perform long-term site management, land management, site transition support, records management, and other related tasks. All activities formerly conducted under the LTS&M Program have been incorporated into the Office of Land and Site Management (LM–50), as well as management of remedies involving ground water and surface water contaminated by former processing activities.

  10. The Savannah River Site`s Groundwater Monitoring Program. Fourth quarter, 1990

    SciTech Connect (OSTI)

    Not Available

    1991-06-18T23:59:59.000Z

    This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted in the fourth quarter of 1990. It includes the analytical data, field data, well activity data, and other documentation for this program, provides a record of the program`s activities and rationale, and serves as an official document of the analytical results. The groundwater monitoring program includes the following activities: installation, maintenance, and abandonment of monitoring wells, environmental soil borings, development of the sampling and analytical schedule, collection and analyses of groundwater samples, review of analytical and other data, maintenance of the databases containing groundwater monitoring data, quality assurance (QA) evaluations of laboratory performance, and reports of results to waste-site facility custodians and to the Environmental Protection Section (EPS) of EPD.

  11. Hydrogen and Oxygen Gas Monitoring System Design and Operation

    SciTech Connect (OSTI)

    Lee C. Cadwallader; Kevin G. DeWall; J. Stephen Herring

    2007-06-01T23:59:59.000Z

    This paper describes pertinent design practices of selecting types of monitors, monitor unit placement, setpoint selection, and maintenance considerations for gas monitors. While hydrogen gas monitors and enriched oxygen atmosphere monitors as they would be needed for hydrogen production experiments are the primary focus of this paper, monitors for carbon monoxide and carbon dioxide are also discussed. The experiences of designing, installing, and calibrating gas monitors for a laboratory where experiments in support of the DOE Nuclear Hydrogen Initiative (NHI) are described along with codes, standards, and regulations for these monitors. Information from the literature about best operating practices is also presented. The NHI program has two types of activities. The first, near-term activity is laboratory and pilot-plant experimentation with different processes in the kilogram per day scale to select the most promising types of processes for future applications of hydrogen production. Prudent design calls for indoor gas monitors to sense any hydrogen leaks within these laboratory rooms. The second, longer-term activity is the prototype, or large-scale plants to produce tons of hydrogen per day. These large, outdoor production plants will require area (or “fencepost”) monitoring of hydrogen gas leaks. Some processes will have oxygen production with hydrogen production, and any oxygen releases are also safety concerns since oxygen gas is the strongest oxidizer. Monitoring of these gases is important for personnel safety of both indoor and outdoor experiments. There is some guidance available about proper placement of monitors. The fixed point, stationary monitor can only function if the intruding gas contacts the monitor. Therefore, monitor placement is vital to proper monitoring of the room or area. Factors in sensor location selection include: indoor or outdoor site, the location and nature of potential vapor/gas sources, chemical and physical data of the gases or vapors, liquids with volatility need sensors near the potential sources of release, nature and concentration of gas releases, natural and mechanical ventilation, detector installation locations not vulnerable to mechanical or water damage from normal operations, and locations that lend themselves to convenient maintenance and calibration. The guidance also states that sensors should be located in all areas where hazardous accumulations of gas may occur. Such areas might not be close to release points but might be areas with restricted air movement. Heavier than air gases are likely to accumulate in pits, trenches, drains, and other low areas. Lighter than air gases are more likely to accumulate in overhead spaces, above drop ceilings, etc. In general, sensors should be located close to any potential sources of major release of gas. The paper gives data on monitor sensitivity and expected lifetimes to support the monitor selection process. Proper selection of indoor and outdoor locations for monitors is described, accounting for the vapor densities of hydrogen and oxygen. The latest information on monitor alarm setpoint selection is presented. Typically, monitors require recalibration at least every six months, or more frequently for inhospitable locations, so ready access to the monitors is an important issue to consider in monitor siting. Gas monitors, depending on their type, can be susceptible to blockages of the detector element (i.e., dus

  12. Long-Term Surveillance Operations and Maintenance Fiscal Year...

    Office of Environmental Management (EM)

    3 Year-End Summary Report Long-Term Surveillance Operations and Maintenance Fiscal Year 2013 Year-End Summary Report LTS-O&M is at the core of LM efforts to fulfill a strategy that...

  13. Long-Term Surveillance and Maintenance Requirements for Remediated...

    Broader source: Energy.gov (indexed) [DOE]

    transferred to the U.S. Department of Energy (DOE) for long-term surveillance and maintenance (LTS&M). Source document citations are presented. Most of these sites meet criteria...

  14. Investigating the maintenance of the mouse definitive adrenal cortex 

    E-Print Network [OSTI]

    Zhao, Xin

    2013-11-29T23:59:59.000Z

    and Cyp11b1 that encode the enzymes aldosterone synthase and 11?-hydroxylase, which catalyze the terminal reactions in the production of aldosterone and corticosterone, respectively. This thesis aims to investigate the maintenance of the definitive mouse...

  15. Method and computer program product for maintenance and modernization backlogging

    DOE Patents [OSTI]

    Mattimore, Bernard G; Reynolds, Paul E; Farrell, Jill M

    2013-02-19T23:59:59.000Z

    According to one embodiment, a computer program product for determining future facility conditions includes a computer readable medium having computer readable program code stored therein. The computer readable program code includes computer readable program code for calculating a time period specific maintenance cost, for calculating a time period specific modernization factor, and for calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. In another embodiment, a computer-implemented method for calculating future facility conditions includes calculating a time period specific maintenance cost, calculating a time period specific modernization factor, and calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. Other embodiments are also presented.

  16. Maintenance-based design of concrete parking structures

    E-Print Network [OSTI]

    Stoakes, Christopher D. (Christopher David)

    2007-01-01T23:59:59.000Z

    The purpose of this study is to determine what type of preventative maintenance for a concrete parking structure will produce the maximum economic benefit. Existing models for concrete deterioration are analyzed for their ...

  17. Multi-canister overpack operations and maintenance manual

    SciTech Connect (OSTI)

    PIERCE, S.R.

    1999-06-23T23:59:59.000Z

    This manual provides general operating and maintenance instructions for the Multi-Canister Overpack. Procedure outlines included are conceptual in nature and will be modified, expanded, and refined during preparation of detailed operating procedures.

  18. Live long and prosper: Germline stem cell maintenance

    E-Print Network [OSTI]

    Extavour, Cassandra

    Live long and prosper: Germline stem cell maintenance revisited (retrospective on DOI: 10.1002/bies aging is rapid or their divisions tend to produce game- togenic daughters, then they may limit animals

  19. Los Alamos Site Office Nuclear Maintenance Management Program...

    Office of Environmental Management (EM)

    WCRR Monthly Diesel Generator PM, dated 04082011 WI 06.01 Attachment A, JRF-11-06 Preventive Maintenance Cancellation, dated 4122011 WI 06.01 Attachment A, JRF-11-09...

  20. Energy Conservation Thru Steam Trap Surveys and Preventive Maintenance Programs

    E-Print Network [OSTI]

    Boynton, T.; Dewhirst, B.

    1980-01-01T23:59:59.000Z

    This paper will deal with steam trap surveys and preventive maintenance programs and the energy savings that may be realized from such efforts. Trap survey organization, flexibility, simplicity, and mechanics will be reviewed, including the economic...

  1. Gas Turbine Technology, Part B: Components, Operations and Maintenance 

    E-Print Network [OSTI]

    Meher-Homji, C. B.; Focke, A. B.

    1985-01-01T23:59:59.000Z

    This paper builds on Part A and discusses the hardware involved in gas turbines as well as operations and maintenance aspects pertinent to cogeneration plants. Different categories of gas turbines are reviewed such as heavy duty aeroderivative...

  2. Job Maintenance and Capital Development Fund (North Carolina)

    Broader source: Energy.gov [DOE]

    The Job Maintenance and Capital Development Fund provides annual grants to businesses which are located in Development Tier I counties. The Fund is intended to encourage the retention of...

  3. Written emotional expression: Effects on weight loss and maintenance

    E-Print Network [OSTI]

    Hockemeyer, Jill Renee

    2007-10-16T23:59:59.000Z

    the negative effects of distress on weight loss and maintenance through improved emotional self-regulatory processes. This study examined the effects of expressive writing on weight regain, stress, and emotional eating among individuals who have recently lost...

  4. activity maintenance study: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for direct the interferometer outside the Earth atmosphere and far from the Earth-Moon enviroment. The orbits around the L2 Barcelona, Universitat de 364 The maintenance of...

  5. A Portable Expert System for Gas Turbine Maintenance

    E-Print Network [OSTI]

    Quentin, G. H.

    A PORTABLE EXPERT SYSTEM FOR GAS TURBINE MAINTENANCE Or. George H. Quentin Electric Power Research Institute (EPRI) Palo Alto, California ABSTRACT TURBINE CONTROLS GROUND FAULT ADVISOR Combustion turbines for electric power generation..., EPRI has developed The SA.VANT- System. This unique multi-faceted portable unit will apply a broad range of expert systems in the workplace for power plant maintenance, including turbomachinery of all types, but especially for gas turbines. I...

  6. Maintenance Implementation Plan for B Plant. Revision 1

    SciTech Connect (OSTI)

    Tritt, S.E.

    1993-04-01T23:59:59.000Z

    The objective of the Maintenance Implementation Plan (MIP) is to describe how the B Plant will implement the requirements established by US Department of Energy (DOE) Order 4330.4A, Maintenance Management Program, Chapter II, ``Nuclear Facilities`` (DOE 1990). The plan provides a blueprint for a disciplined approach to implementation and compliance. Each element of the order is prioritized, categorized, and then placed into one of three phases for implementation.

  7. Hearth monitoring experiences at Dofasco`s No. 4 blast furnace

    SciTech Connect (OSTI)

    Stothart, D.W.; Chaykowski, R.D.; Donaldson, R.J.; Pomeroy, D.H.

    1997-12-31T23:59:59.000Z

    As a result of a 1994 taphole breakout at Dofasco`s No. 4 Blast Furnace, extensive effort has gone into monitoring, understanding and controlling hearth wear. This paper reviews the hearth monitoring system developed and the various hearth operating and maintenance techniques used to ensure No. 4 Blast Furnace safely reaches its 1998 reline date. The impact of changes in coke quality, productivity, casting practice and leaking cooling members on hearth refractory temperature fluctuations will also be examined.

  8. Application of Condition-Based Monitoring Techniques for Remote Monitoring of a Simulated Gas Centrifuge Enrichment Plant

    SciTech Connect (OSTI)

    Hooper, David A [ORNL; Henkel, James J [ORNL; Whitaker, Michael [ORNL

    2012-01-01T23:59:59.000Z

    This paper presents research into the adaptation of monitoring techniques from maintainability and reliability (M&R) engineering for remote unattended monitoring of gas centrifuge enrichment plants (GCEPs) for international safeguards. Two categories of techniques are discussed: the sequential probability ratio test (SPRT) for diagnostic monitoring, and sequential Monte Carlo (SMC or, more commonly, particle filtering ) for prognostic monitoring. Development and testing of the application of condition-based monitoring (CBM) techniques was performed on the Oak Ridge Mock Feed and Withdrawal (F&W) facility as a proof of principle. CBM techniques have been extensively developed for M&R assessment of physical processes, such as manufacturing and power plants. These techniques are normally used to locate and diagnose the effects of mechanical degradation of equipment to aid in planning of maintenance and repair cycles. In a safeguards environment, however, the goal is not to identify mechanical deterioration, but to detect and diagnose (and potentially predict) attempts to circumvent normal, declared facility operations, such as through protracted diversion of enriched material. The CBM techniques are first explained from the traditional perspective of maintenance and reliability engineering. The adaptation of CBM techniques to inspector monitoring is then discussed, focusing on the unique challenges of decision-based effects rather than equipment degradation effects. These techniques are then applied to the Oak Ridge Mock F&W facility a water-based physical simulation of a material feed and withdrawal process used at enrichment plants that is used to develop and test online monitoring techniques for fully information-driven safeguards of GCEPs. Advantages and limitations of the CBM approach to online monitoring are discussed, as well as the potential challenges of adapting CBM concepts to safeguards applications.

  9. Maintenance implementation plan for the Plutonium Finishing Plant. Revision 3

    SciTech Connect (OSTI)

    Meldrom, C.A.

    1996-03-01T23:59:59.000Z

    This document outlines the Maintenance Implementation Plan (MIP) for the Plutonium Finishing Plant (PFP) located at the Hanford site at Richland, Washington. This MIP describes the PFP maintenance program relative to DOE order 4330.4B. The MIP defines the key actions needed to meet the guidelines of the Order to produce a cost-effective and efficient maintenance program. A previous report identified the presence of significant quantities of Pu-bearing materials within PFP that pose risks to workers. PFP`s current mission is to develop, install and operate processes which will mitigate these risks. The PFP Maintenance strategy is to equip the facility with systems and equipment able to sustain scheduled PFP operations. The current operating run is scheduled to last seven years. Activities following the stabilization operation will involve an Environmental Impact Statement (EIS) to determine future plant activities. This strategy includes long-term maintenance of the facility for safe occupancy and material storage. The PFP maintenance staff used the graded approach to dictate the priorities of the improvement and upgrade actions identified in Chapter 2 of this document. The MIP documents PFP compliance to the DOE 4330.4B Order. Chapter 2 of the MIP follows the format of the Order in addressing the eighteen elements. As this revision is a total rewrite, no sidebars are included to highlight changes.

  10. Just In-Time Maintenance of Nuclear Power Plants

    SciTech Connect (OSTI)

    DR. Alexander G. Parlos

    2002-01-22T23:59:59.000Z

    The goal of this project has been to develop and demonstrate the feasibility of a new technology for maintenance engineering: a Just-In-Time Maintenance (JITM) system for rotating machines. The JITM system is based on several key developments at Texas A and M over the past ten years in emerging intelligent information technologies, which if integrated into a single system could provide a revolutionary approach in the way maintenance is performed. Rotating machines, such as induction motors, range from a few horse power (hp) to several thousand hp in size, and they are widely used in nuclear power plants and in other industries. Forced outages caused by induction motor failures are the reason for as much as 15% - 40% of production costs to be attributable to maintenance, whereas plant shutdowns caused by induction motor failures result in daily financial losses to the utility and process industries of $1 M or more. The basic components of the JITM system are the available machine sensors, that is electric current sensors and accelerometers, and the computational algorithms used in the analysis and interpretation of the occurring incipient failures. The JITM system can reduce the costs attributable to maintenance by about 40% and it can lower the maintenance budgets of power and process plants by about 35%, while requiring no additional sensor installation. As a result, the JITM system can improve the competitiveness of US nuclear utilities at minimal additional cost.

  11. Social Traditions and the Maintenance and Loss of Geographic Variation in Mating Patterns of Brown-Headed Cowbirds

    E-Print Network [OSTI]

    Freeberg, Todd M.; White, David J.

    2006-01-01T23:59:59.000Z

    Social Traditions and the Maintenance and Loss of Geographiccould play a role in the maintenance of distinct groupings

  12. Technical Insights for Saltstone PA Maintenance

    SciTech Connect (OSTI)

    Flach, G.; Sarkar, S.; Mahadevan, S.; Kosson, D.

    2011-07-20T23:59:59.000Z

    The Cementitious Barriers Partnership (CBP) is a collaborative program sponsored by the US DOE Office of Waste Processing. The objective of the CBP is to develop a set of computational tools to improve understanding and prediction of the long-term structural, hydraulic, and chemical performance of cementitious barriers and waste forms used in nuclear applications. CBP tools are expected to better characterize and reduce the uncertainties of current methodologies for assessing cementitious barrier performance and increase the consistency and transparency of the assessment process, as the five-year program progresses. In September 2009, entering its second year of funded effort, the CBP sought opportunities to provide near-term tangible support to DOE Performance Assessments (PAs). The Savannah River Saltstone Disposal Facility (SDF) was selected for the initial PA support effort because (1) cementitious waste forms and barriers play a prominent role in the performance of the facility, (2) certain important long-term behaviors of cementitious materials composing the facility are uncertain, (3) review of the SDF PA by external stakeholders is ongoing, and (4) the DOE contractor responsible for the SDF PA is open to receiving technical assistance from the CBP. A review of the current (SRR Closure & Waste Disposal Authority 2009) and prior Saltstone PAs (e.g., Cook et al. 2005) suggested five potential opportunities for improving predictions. The candidate topics considered were (1) concrete degradation from external sulfate attack, (2) impact of atmospheric exposure to concrete and grout before closure, such as accelerated slag and Tc-99 oxidation, (3) mechanistic prediction of geochemical conditions, (4) concrete degradation from rebar corrosion due to carbonation, and (5) early age cracking from drying and/or thermal shrinkage. The candidate topics were down-selected considering the feasibility of addressing each issue within approximately six months, and compatibility with existing CBP expertise and already-planned activities. Based on these criteria, the five original topics were down-selected to two: external sulfate attack and mechanistic geochemical prediction. For each of the selected topics, the CBP communicated with the PA analysts and subject matter experts at Savannah River to acquire input data specific to the Saltstone facility and related laboratory experiments. Simulations and analyses were performed for both topics using STADIUM (SIMCO 2008), LeachXS/ORCHESTRA (ECN 2007, Meeussen 2003), and other software tools. These supplemental CBP analyses produced valuable technical insights that can be used to strengthen the Saltstone PA using the ongoing PA maintenance process. This report in part summarizes key information gleaned from more comprehensive documents prepared by Sarkar et al. (2010), Samson (2010), and Sarkar (2010).

  13. Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2012

    SciTech Connect (OSTI)

    None

    2013-03-01T23:59:59.000Z

    This report summarizes the 2012 annual inspection, sampling, measurement, and maintenance activities performed at the Salmon, Mississippi, Site (Salmon site). The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County, Mississippi (DOE 2007) specifies the submittal of an annual report of site activities with the results of sample analyses. A revised plan is in preparation. The Long-Term Surveillance Plan for the Salmon, Mississippi, Site is intended for release in 2013. The Salmon site consists of 1,470 acres. The site is located in Lamar County, Mississippi, approximately 10 miles west of Purvis, Mississippi, and about 21 miles southwest of Hattiesburg, Mississippi The State of Mississippi owns the surface real estate subject to certain restrictions related to subsurface penetration. The State is the surface operator; the Mississippi Forestry Commission is its agent. The federal government owns the subsurface real estate (including minerals and some surface features), shares right-of-entry easements with the State, and retains rights related to subsurface monitoring. The U.S. Department of Energy (DOE) Office of Legacy Management (LM), a successor agency to the U.S. Atomic Energy Commission, is responsible for the long-term surveillance of the subsurface real estate

  14. PoS(ACAT)027 Online Monitoring for the CDF Run II Experiment

    E-Print Network [OSTI]

    -antiproton interactions at 1.96 TeV center of mass energy. The CDF detector, whose detailed description can be found maintenance and operation simple and efficient. Only one shift person is needed to monitor the entire CDF detector, including the trigger system. High data quality check is assured in real time and well defined

  15. Method for computing efficient electrical indicators for offshore wind turbine monitoring

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    by offshore deployment of wind farms. The offshore turbines have much lower accessibility(1) so maintenanceMethod for computing efficient electrical indicators for offshore wind turbine monitoring Georgia.cablea, pierre.granjon, christophe.berenguer} @gipsa-lab.grenoble-inp.fr Abstract Offshore wind turbines

  16. A Brief Status on Condition Monitoring and Fault Diagnosis in Wind Energy Conversion Systems

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    A Brief Status on Condition Monitoring and Fault Diagnosis in Wind Energy Conversion Systems--There is a constant need for the reduction of operational and maintenance costs of Wind Energy Conversion Systems since they are situated on extremely high towers, which are normally 20 m or more in height

  17. Condition Monitoring and Fault Diagnosis in Wind Energy Conversion Systems: A Review

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Condition Monitoring and Fault Diagnosis in Wind Energy Conversion Systems: A Review Y. Amirat, M for the reduction of operational and maintenance costs of Wind Energy Conversion Systems (WECS). The most efficient they are situated on extremely high towers, which are normally 20 m or greater in height. There are also plans

  18. TOWARDS LIFE-CYCLE MANAGEMENT OF WIND TURBINES BASED ON STRUCTURAL HEALTH MONITORING

    E-Print Network [OSTI]

    Stanford University

    TOWARDS LIFE-CYCLE MANAGEMENT OF WIND TURBINES BASED ON STRUCTURAL HEALTH MONITORING K. Smarsly1) strategies can enable wind turbine manufacturers, owners, and operators to precisely schedule maintenance behavior of wind turbines and to reduce (epistemic) uncertainty. Both the resistance parameters

  19. Monitoring based on time-frequency tracking of estimated harmonic series and modulation sidebands

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    corinne.mailhes@enseeiht.fr The installation of a Condition Monitoring System (CMS) on a mechanical machine (e.g., on a wind turbine) aims to reduce the operating costs by applying a predictive maintenance for simulating a wind turbine operation and for which the inner race of the main bearing has been damaged. Above

  20. Effect of shot type, task difficulty and research environment on consistency of pre-performance routines in golf 

    E-Print Network [OSTI]

    Cotterill, Stewart T

    2007-01-01T23:59:59.000Z

    Golfers have been encouraged to develop consistent pre-performance routines (PPRs) in order to enhance their performance. However, the theoretical underpinning of these recommendations is unclear. Issues relating to the ...

  1. Routine Urine Culture at the Time of Percutaneous Urinary Drainage: Does Every Patient Need One?

    SciTech Connect (OSTI)

    Brody, L.A., E-mail: brodyl@mskcc.org; Brown, K.T.; Covey, A.M. [Memorial Sloan-Kettering Cancer Center, Department of Radiology, Section of Interventional Radiology and Image Guided Therapy (United States); Brown, A.E. [Service of Infectious Disease, Memorial Sloan-Kettering Cancer Center, Department of Medicine (United States); Getrajdman, G.I. [Memorial Sloan-Kettering Cancer Center, Department of Radiology, Section of Interventional Radiology and Image Guided Therapy (United States)

    2006-08-15T23:59:59.000Z

    Purpose. To determine the clinical variables associated with bacteriuria in patients undergoing primary percutaneous antegrade urinary drainage procedures in order to predict the utility of routinely obtaining urine cultures at the time of the procedure. Methods. Between October 1995 and March 1998 urine cultures were prospectively obtained in all patients undergoing a primary percutaneous antegrade urinary drainage procedure. One hundred and eighty-seven patients underwent 264 procedures. Results were available in 252 cases. Culture results were correlated with clinical, laboratory, and demographic variables. Anaerobic cultures were not uniformly performed. Results. Urine cultures were positive in 24 of 252 (9.5%) cases. An indwelling or recently removed ipsilateral device (catheter or stent) and a history of previous cystectomy with urinary diversion were significant predictors of a positive culture. Patients without either of these predictors, and without clinical or laboratory evidence of infection, were rarely found to have positive cultures. Conclusion. The likelihood of a positive urine culture can be predicted on the basis of the aforementioned clinical variables. In the absence of these clinical indicators routine urine cultures are neither useful nor cost-effective.

  2. Applicability of Operational Research Techniques in CANDU Nuclear Plant Maintenance

    SciTech Connect (OSTI)

    Doyle, E. Kevin [Bruce Power LP, Box 4000B12, Tiverton, Ont., N0G2T0 (Canada)

    2002-07-01T23:59:59.000Z

    As previously reported at ICONE 6 in New Orleans, 1996, and ICONE 9 in Niece, 2001, the use of various maintenance optimization techniques at Bruce has lead to cost effective preventive maintenance applications for complex systems. Innovative practices included greatly reducing Reliability Centered Maintenance (RCM) costs while maintaining the accuracy of the analysis. The optimization strategy has undergone further evolution and at the present an Integrated Maintenance Program (IMP) is being put in place. Further cost refinement of the station preventive maintenance strategy whereby decisions are based on statistical analysis of historical failure data is being evaluated. A wide range of Operational Research (OR) literature was reviewed for implementation issues and several encouraging areas were found that will assist in the current effort of evaluating maintenance optimization techniques for nuclear power production. The road ahead is expected to consist first of resolving 25 years of data issues and preserving the data via appropriate knowledge system techniques while post war demographics permit experts to input into the system. Subsequent analytical techniques will emphasize total simplicity to obtain the requisite buy in from Corporate Executives who possibly are not trained in Operational Research. Case studies of containment airlock seal failures are used to illustrate the direct applicability of stochastic processes. Airlocks and transfer chambers were chosen as they have long been known as high maintenance items. Also, the very significant financial consequences of this type of failure will help to focus the attention of Senior Management on the effort. Despite substantial investment in research, improvement in the design of the seal material or configuration has not been achieved beyond the designs completed in the 1980's. Overall, the study showed excellent agreement of the relatively quick stochastic methods with the maintenance programs produced at great cost over years of trial and error. The pivotal role of expert opinion via experienced users/problem owners/maintenance engineers in all phases of the method and its application was noted and will be explored in subsequent efforts. The results are displayed via economic alternatives to more easily attract the attention of Maintenance Managers. Graphical overviews of the data demonstrated that substantial insight can be gained by simply organizing the data into statistically meaningful arrays such as histograms. The conclusions highlight several very positive avenues to evaluate at this particular juncture in time. (author)

  3. Portal radiation monitor

    DOE Patents [OSTI]

    Kruse, Lyle W. (Albuquerque, NM)

    1985-01-01T23:59:59.000Z

    A portal radiation monitor combines 0.1% FAR with high sensitivity to special nuclear material. The monitor utilizes pulse shape discrimination, dynamic compression of the photomultiplier output and scintillators sized to maintain efficiency over the entire portal area.

  4. APS Building Monitors

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Building Monitors For non-401 Building Monitors, select: LOMs Other APS Buildings 401 West WCtr Lab Wing ECtr East 5th Floor Yiying Ge na na na na 4th Floor Rick Fenner Karen...

  5. Corrosion monitoring apparatus

    DOE Patents [OSTI]

    Isaacs, Hugh S. (Shoreham, NY); Weeks, John R. (Stony Brook, NY)

    1980-01-01T23:59:59.000Z

    A corrosion monitoring device in an aqueous system which includes a formed crevice and monitoring the corrosion of the surfaces forming the crevice by the use of an a-c electrical signal.

  6. Single-machine scheduling with periodic and exible periodic maintenance to minimize maximum tardiness

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    periods often appear in industry due to a machine breakdown (stochastic) or preventive maintenance of machine unavailability. However, in some cases (e.g. preventive maintenance), the maintenance of a machineSingle-machine scheduling with periodic and exible periodic maintenance to minimize maximum

  7. DYNAMIC AND MULTI-CRITERIA SCHEDULING OF MAINTENANCE ACTIVITIES F. Marmier, C. Varnier, N Zerhouni

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    . There are mainly two types of maintenance activities: the preventive maintenance, whose activities can be long termDYNAMIC AND MULTI-CRITERIA SCHEDULING OF MAINTENANCE ACTIVITIES F. Marmier, C. Varnier, N Zerhouni good performance with production means. Especially in maintenance services field where the different

  8. Analysis of OREDA Data for Maintenance Optimisation Langseth, H., Haugen, K., Sandtorv, H.

    E-Print Network [OSTI]

    Langseth, Helge

    maintenance interval , and the critical failure rate given that no preventive maintenance is performed (asAnalysis of OREDA Data for Maintenance Optimisation Langseth, H., Haugen, K., Sandtorv, H. SINTEF". The suggested modelling provides means to predict how maintenance tasks will affect the rate of critical

  9. Designing an on-line multimedia maintenance manual for a production environment

    E-Print Network [OSTI]

    Brinkman, Willem-Paul

    ). It is a combination of design-out maintenance (DOM) and preventive maintenance. The focus of DOM is to improve36 Designing an on-line multimedia maintenance manual for a production environment W.P. Brinkman, V.P. Buil, R. Cullen1 , R. Gobits2 and F.L. van Nes e-mail: w.p.brinkman@tue.nl Abstract Maintenance

  10. The Savannah River Site's Groundwater Monitoring Program, third quarter 1989

    SciTech Connect (OSTI)

    Not Available

    1989-01-01T23:59:59.000Z

    The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site's Groundwater Monitoring Program. During third quarter 1989 (July--September), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead they aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the third quarter is presented in the Flagging Criteria section of this document. All analytical results from third quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

  11. Idaho National Laboratory Cultural Resource Monitoring Report for FY 2010

    SciTech Connect (OSTI)

    INL Cultural Resource Management Office

    2010-10-01T23:59:59.000Z

    This report describes the cultural resource monitoring activities of the Idaho National Laboratory’s (INL) Cultural Resource Management (CRM) Office during fiscal year 2010 (FY 2010). Throughout the year, thirty-three cultural resource localities were revisited, including somethat were visited more than once, including: two locations with Native American human remains, one of which is a cave, two additional caves, twenty-six prehistoric archaeological sites, two historic stage stations, and Experimental Breeder Reactor-I, which is a designated National Historic Landmark. The resources that were monitored included seventeen that are routinely visited and sixteen that are located in INL project areas. Although impacts were documented at a few locations and one trespassing incident (albeit sans formal charges) was discovered, no significant adverse effects that would threaten the National Register eligibility of any resources were observed. Monitoring also demonstrated that several INL projects generally remain in compliance with recommendations to protect cultural resources.

  12. The Savannah River Site's Groundwater Monitoring Program, first quarter 1989

    SciTech Connect (OSTI)

    Not Available

    1989-01-01T23:59:59.000Z

    The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site's Groundwater Monitoring Program. During first quarter 1989 (January--March), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the first quarter is presented in the Flagging Criteria section of this document. All analytical results from first quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

  13. The Savannah River Site's Groundwater Monitoring Program, second quarter 1989

    SciTech Connect (OSTI)

    Not Available

    1989-01-01T23:59:59.000Z

    The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site's Groundwater Monitoring Program. During second quarter 1989 (April--June), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the second quarter is presented in the Flagging Criteria section of this document. All analytical results from second quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

  14. The Savannah River Site's Groundwater Monitoring Program, second quarter 1990

    SciTech Connect (OSTI)

    Not Available

    1991-02-07T23:59:59.000Z

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site's (SRS) Groundwater Monitoring Program. During second quarter 1990 (April through June) EPD/EMS conducted routine sampling of monitoring wells and drinking water locations. EPD/EMS established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the second quarter is presented in the Flagging Criteria section of this document. All analytical results from second quarter 1990 are listed in this report.

  15. Augmented Fish Monitoring, 1988 Annual Report.

    SciTech Connect (OSTI)

    Michak, Patty

    1989-05-01T23:59:59.000Z

    Since 1986 Washington department of Fisheries (WDF) has participated in the Columbia Basin Augmented Fish Health Monitoring Project. This project provides a standardized level of fish health information from all Agencies rearing fish in the Columbia Basin. WDF has actively participated in this project, and completed its second year of fish health monitoring, data collection and pathogen inspection during 1988. This report will present data collected from January 1, 1988 to December 31, 1988 and will compare sampling results from 1987 and 1988. The analysis will be divided in two sections: adult analysis and juvenile analysis. The adult analysis will include results from screening at spawning for viral pathogens and bacterial kidney disease (BKD), and evaluation of causes of pre-spawning loss. The juvenile analysis will include pre-release examination results, mid-term rearing exam results and evaluation of the Organosomatic Analysis completed on index stocks. Additionally, highlights from monthly monitoring exams will identify any significant and unusual findings from the routine exams completed in 1988. 6 refs., 8 figs., 14 tabs.

  16. Final Report for the Arroyo Las Positas Maintenance Impact Study, Lawrence Livermore National Laboratory

    SciTech Connect (OSTI)

    van Hattem, M; Paterson, L

    2006-01-12T23:59:59.000Z

    In 2000, the Lawrence Livermore National Laboratory's (LLNL) Environmental Protection Department, in coordination with Plant Engineering (PE), began dredging sections of the Arroyo Las Positas (ALP) to alleviate concerns about flooding of sensitive facilities within the mainsite of Lawrence Livermore National Laboratory. In order to reduce potential impacts on the federally threatened California red-legged frog (Rana aurora draytonii), LLNL proposed to dredge sections of the ALP in a ''checkerboard pattern'', resulting in a mosaic of open water habitat and vegetated sections (Figure 1). The Arroyo Las Positas Management Plan (Plan) was coordinated with both state and federal agencies including the U.S. Fish and Wildlife Service (USFWS), California Department of Fish and Game (CDF&G), San Francisco Regional Water Quality Control Board (SFRWQCB), and the Army Corp of Engineers (ACOE). Water Discharge Requirements (WDRs) were issued for this project on December 30, 1999 (Order No. 99-086) by the SFRWQCB. Provision 19 of the WDRs outlined a five-year (2000 through 2004) Maintenance Impact Study (MIS) that LLNL began in coordination with dredging work that was conducted as part of the Arroyo Las Positas Management Plan. Provision 20 of these WDRs requires LLNL to submit a final report of the results of the Maintenance Impact Study for this project to the SFRWQCB. The purpose of this report is to present the results of the Maintenance Impact Study for Arroyo Las Positas and meet the requirements of Provision 20. A description of the annual monitoring included in this Maintenance Impact Study is included in the methods section of this report. Initially the Plan called for dredging the entire length of the Arroyo Las Positas (approximately 6,981 linear feet) over a 5-year period to minimize temporal impacts on the California red-legged frog. Dredging occurred in 2000 ({approx}1,300 ft.), 2001 ({approx}800 ft.), and 2002 ({approx}1,200 ft.), which constituted approximately 3,300 ft., or roughly half of the entire Plan (Figure 2). Logistical challenges and unanticipated cost influenced the decision to terminate the project prior to completion, and re-evaluate the long-term management goals for the ALP. No dredging was conducted in the final two years of the plan (2003 and 2004).

  17. Operations, Maintenance, and Replacement 10-Year Plan, 1990 -1999.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1990-08-01T23:59:59.000Z

    In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the late summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-Year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

  18. Operations, Maintenance, and Replacement 10-Year Plan, 1990--1999

    SciTech Connect (OSTI)

    Not Available

    1990-08-01T23:59:59.000Z

    In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the later summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

  19. Seismic Imaging and Monitoring

    SciTech Connect (OSTI)

    Huang, Lianjie [Los Alamos National Laboratory

    2012-07-09T23:59:59.000Z

    I give an overview of LANL's capability in seismic imaging and monitoring. I present some seismic imaging and monitoring results, including imaging of complex structures, subsalt imaging of Gulf of Mexico, fault/fracture zone imaging for geothermal exploration at the Jemez pueblo, time-lapse imaging of a walkway vertical seismic profiling data for monitoring CO{sub 2} inject at SACROC, and microseismic event locations for monitoring CO{sub 2} injection at Aneth. These examples demonstrate LANL's high-resolution and high-fidelity seismic imaging and monitoring capabilities.

  20. Risk analysis study of non-routine turbine/generator shutdown events and intake gate evaluation

    SciTech Connect (OSTI)

    Bardy, D.M. [Hydroelectric Design Center, Portland, OR (United States)

    1995-12-31T23:59:59.000Z

    The Corps of Engineers has undertaken a study to perform a reliability and risk analysis for evaluating non-routine turbine/generator shutdown scenarios. The study will evaluate the risks associated with events that would require a powerhouse to shut down a turbine/generator by using intake gates. The goal of this project is to estimate any potential damage that could occur for various intake gate configurations and closure times. The data obtained can also be used to evaluate any of the systems that affect reliability of the turbine/generator using established methods of risk analysis. This paper will briefly outline the study objectives and describe the progress of the study to this point.

  1. Environmental Monitoring Plan

    SciTech Connect (OSTI)

    Holland, R.C. [Science Applications International Corp., San Diego, CA (United States)

    1993-07-01T23:59:59.000Z

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. This revision to the Environmental Monitoring Plan was written to document the changes made to the Monitoring Program during 1992. Some of the data (most notably the statistical analyses of past monitoring data) has not been changed.

  2. Sandia Energy - Structural Health Monitoring

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Structural Health Monitoring Home Stationary Power Energy Conversion Efficiency Wind Energy Materials, Reliability, & Standards Structural Health Monitoring Structural Health...

  3. IDENTIFICATION OF DOE'S POST-CLOSURE MONITORING NEEDS AND REQUIREMENTS

    SciTech Connect (OSTI)

    M.A. Ebadian, Ph.D.

    1999-01-01T23:59:59.000Z

    The 2006 plan sets an ambitious agenda for the U.S. Department of Energy (DOE), Office of Environmental Management (EM) and the remediation of sites contaminated by decades of nuclear weapons production activities. The plan's primary objective is to reduce overall clean up costs by first eliminating the environmental problems that are most expensive to control and safely maintain. In the context of the 2006 Plan, closure refers to the completion of area or facility specific cleanup projects. The cleanup levels are determined by the planned future use of the site or facility. Use restrictions are still undecided for most sites but are highly probable to exclude residential or agricultural activities. Most of the land will be remediated to ''industrial use'' levels with access restrictions and some areas will be closed-off through containment. Portions of the site will be reserved for waste disposal, either as a waste repository or the in-situ immobilization of contaminated soil and groundwater, and land use will be restricted to waste disposal only. The land used for waste disposal will require monitoring and maintenance activities after closure. Most of the land used for industrial use may also require such postclosure activities. The required postclosure monitoring and maintenance activities will be imposed by regulators and stakeholders. Regulators will not approve closure plans without clearly defined monitoring methods using approved technologies. Therefore, among all other more costly and labor-intensive closure-related activities, inadequate planning for monitoring and lack of appropriate monitoring technologies can prevent closure. The purpose of this project is to determine, document, and track the current and evolving postclosure monitoring requirements at DOE-EM sites. This information will aid CMST-CP in guiding its postclosure technology development and deployment efforts.

  4. INTERIM REPORT ON CONCRETE DEGRADATION MECHANISMS AND ONLINE MONITORING TECHNIQUES

    SciTech Connect (OSTI)

    Mahadevan, Sankaran; Agarwal, Vivek; Neal, Kyle; Kosson, David; Adams, Douglas

    2014-09-01T23:59:59.000Z

    The existing fleets of nuclear power plants in the United States have initial operating licenses of 40 years, though most these plants have applied for and received license extensions. As plant structures, systems, and components age, their useful life—considering both structural integrity and performance—is reduced as a result of deterioration of the materials. The online monitoring of concrete structure conducted under the Advanced Instrumentation, Information, and Control Technologies Pathway of the Light Water Reactor Sustainability program at Idaho National Laboratory will develop and demonstrate concrete structures health monitoring capabilities. Assessment and management of aging concrete structures in nuclear plants require a more systematic approach than simple reliance on existing code margins of safety. Therefore, the structural health monitoring is required to produce actionable information regarding structural integrity that supports operational and maintenance decisions. Through this research project, several national laboratories and Vanderbilt University proposes to develop a framework of research activities for the health monitoring of nuclear power plant concrete structures that includes integration of four elements—damage modeling, monitoring, data analytics, and uncertainty quantification. This report briefly discusses available techniques and ongoing challenges in each of the four elements of the proposed framework with emphasis on degradation mechanisms and online monitoring techniques.

  5. ECM monitoring study, states of Illinois, Indiana, Michigan, Minnesota, Ohio and Wisconsin

    SciTech Connect (OSTI)

    Not Available

    1986-08-15T23:59:59.000Z

    The purposes of the energy conservation measures (ECM's) monitoring program are to: (1) determine if the grants are being conducted in accordance with the ICP regulations and with the terms and conditions of federal financial assistance programs in general; (2) determine if the grantees are on schedule and within budget; (3) ascertain whether required operation and maintenance procedures have been implemented; (4) where appropriate, identify any deviations from funded ECM's; (5) report on any energy savings being realized from the implementation of the operation and maintenance procedures and the funded ECM's; and (6) comment on the general progress of the grantees as a group.

  6. ECM monitoring study, states of Illinois, Indiana, Michigan, Minnesota, Ohio and Wisconsin. Final summary report

    SciTech Connect (OSTI)

    Not Available

    1986-08-15T23:59:59.000Z

    The purposes of the energy conservation measures (ECM`s) monitoring program are to: (1) determine if the grants are being conducted in accordance with the ICP regulations and with the terms and conditions of federal financial assistance programs in general; (2) determine if the grantees are on schedule and within budget; (3) ascertain whether required operation and maintenance procedures have been implemented; (4) where appropriate, identify any deviations from funded ECM`s; (5) report on any energy savings being realized from the implementation of the operation and maintenance procedures and the funded ECM`s; and (6) comment on the general progress of the grantees as a group.

  7. Site action plan for maintenance management program. Revision D

    SciTech Connect (OSTI)

    Pearson, A.W.

    1993-11-30T23:59:59.000Z

    (DOE) Order 4330.4B, ``Maintenance Management Program`` requires each site to develop a Site Action Plan for implementing a Maintenance Management Program. Nonnuclear facilities are required to address the 32 elements of Chapter 1: Guidelines for the Conduct of Maintenance at DOE Nonnuclear Facilities. This document details the degree of implementation for each element, and the Martin Marietta Specialty Components, Inc., plan for implementation of the items which remain to be completed. The original Pinellas Plant Maintenance Management Program Site Action Plan (Issue A) was completed March 27, 1991. The format was modified per DOE request and it was resubmitted as Issue B and approved by AL September 16, 1991. Issue C was submitted, and approved December 20, 1992. The most significant achievement during FY-93 were the implementation of plant wide Graded Approach, and Configuration Control programs. The methodologies for performing these activities were developed, and pilot programs were implemented to verify their effectiveness. Plant wide implementation of both programs is progressing on a high priority basis. The formalized method for grading equipment and facilities provides a basis for establishing uniform, risk based priorities. The risks involved are environment, safety, health and programmatic mission. Other achievements for FY-93, include the establishment of procedures for the decommissioning, and down-grading of facilities, improved work control, improved work performance reporting, improved quality plans, and improved operating procedures.

  8. Growth and maintenance of the mouse adrenal cortex 

    E-Print Network [OSTI]

    Chang, Su-Ping

    2008-01-01T23:59:59.000Z

    and death have been identified. Several models for stem cell maintenance of the adult adrenal cortex have been proposed, but adrenocortical stem cells have not yet been identified. Adrenal cortices of 21OH/LacZ transgenic mice show similar mosaic patterns...

  9. Joint Traffic Blocking and Routing under Network Failures and Maintenances

    E-Print Network [OSTI]

    Liu, Yong

    Joint Traffic Blocking and Routing under Network Failures and Maintenances Chao Liang ECE Dept paths. Therefore, it is important to design ingress traffic blocking and routing jointly to achieve a good balance between the two factors. Working towards this goal, we formulate a joint ingress blocking

  10. CRAD, Maintenance- Oak Ridge National Laboratory High Flux Isotope Reactor

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2007 assessment of the Maintenance Program in preparation for restart of the Oak Ridge National Laboratory High Flux Isotope Reactor.

  11. Maintenance and Operations of Schools for Energy Efficiency

    E-Print Network [OSTI]

    McClure, J. D.; Estes, J. M.

    1986-01-01T23:59:59.000Z

    Maintenance and operations of schools with energy efficiency as a priority can reduce annual utility costs 3 to 30 percent. Most school districts do not have an organized plan for tracking energy usage or cost. Energy performance (e.g. Btu/ft^2-yr...

  12. Model 6000 Laser Controller Operation and Maintenance Manual

    E-Print Network [OSTI]

    i Model 6000 Laser Controller Operation and Maintenance Manual #12;Corporate Headquarters Canada by improper use or failure to observe proper operating procedures per the product specification or operators 9002 by the British Standards Institution. #12;Limited Warranty Newport warrants that this product

  13. ASSESSING EFFORT ESTIMATION MODELS FOR CORRECTIVE MAINTENANCE THROUGH

    E-Print Network [OSTI]

    Bae, Doo-Hwan

    maintenance activities and performing cost/benefits analysis 2007-04-11 3/24Software Engineering Lab, KAIST) 2007-04-11 Software Engineering Lab, KAIST #12;Contents Introduction Overall Approach Empirical project Related Works Conclusion and Discussion 2007-04-11 2/24Software Engineering Lab, KAIST #12

  14. Distributed Construction and Maintenance of Bandwidth and Energy Efficient

    E-Print Network [OSTI]

    Korpeoglu, Ibrahim

    wireless RF technology designed initially for cable replacement at indoor places, but also supports usageDistributed Construction and Maintenance of Bandwidth and Energy Efficient Bluetooth Scatternets on simulations, the paper also presents the improvements in bandwidth-efficiency and reduction in energy

  15. CRAD, Maintenance- Idaho Accelerated Retrieval Project Phase II

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Maintenance program at the Idaho Accelerated Retrieval Project Phase II.

  16. CRAD, Maintenance- Los Alamos National Laboratory TA 55 SST Facility

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for an assessment of the Maintenance program at the Los Alamos National Laboratory TA 55 SST Facility.

  17. Winter Performance and Maintenance of Porous Asphalt Pavements

    E-Print Network [OSTI]

    Concrete (HSG-B)Porous Asphalt (HSG-C) #12;Cold Climate Performance Results #12;12 Porous Asphalt SurfaceWinter Performance and Maintenance of Porous Asphalt Pavements Robert M. Roseen, Ph.D., P.E., D impacts for new development and reverse impacts in areas with redevelopment. #12;Porous Asphalt Design

  18. Enhancing Building Performance Through More Responsive Maintenance System

    E-Print Network [OSTI]

    Alsudairi, A. A.

    2012-01-01T23:59:59.000Z

    forth). For example, installing a water heater needs a plumber and electrician to complete the job in a traditional maintenance system. With MST principle, this work order can be done by one technician instead of two. In this way work orders...

  19. REST Web Service Maintenance Through API Policy Enforcement

    E-Print Network [OSTI]

    California at Santa Barbara, University of

    1 REST Web Service Maintenance Through API Policy Enforcement Hiranya Jayathilaka, Chandra Krintz 100% annual growth rate [2]. These APIs increasingly employ the REST (Representational State Transfer accessible to users via web application programming interfaces (web APIs) and cloud-based deployment

  20. Operation and maintenance considerations for waste-to-energy systems

    SciTech Connect (OSTI)

    Cross, F.; O'Leary, P.; Walsh, P.

    1987-08-01T23:59:59.000Z

    In this article, the author discusses environmental and safety issues surrounding waste-to-energy systems. A facility can be safe and compatible with the surrounding community if management has an ethic to provide for the disposal of refuse in an economic, safe, and environmentally sound manner and the operator is trained in the proper procedures for facility operation, maintenance, troubleshooting and repair.

  1. Radiation monitor for liquids

    DOE Patents [OSTI]

    Koster, J.E.; Bolton, R.D.

    1999-03-02T23:59:59.000Z

    A radiation monitor for use with liquids that utilizes air ions created by alpha radiation emitted by the liquids as its detectable element. A signal plane, held at an electrical potential with respect to ground, collects these air ions. A guard plane or guard rings is used to limit leakage currents. In one embodiment, the monitor is used for monitoring liquids retained in a tank. Other embodiments monitor liquids flowing through a tank, and bodies of liquids, such as ponds, lakes, rivers and oceans. 4 figs.

  2. Radiation monitor for liquids

    DOE Patents [OSTI]

    Koster, James E. (Los Alamos, NM); Bolton, Richard D. (Los Alamos, NM)

    1999-01-01T23:59:59.000Z

    A radiation monitor for use with liquids that utilizes air ions created by alpha radiation emitted by the liquids as its detectable element. A signal plane, held at an electrical potential with respect to ground, collects these air ions. A guard plane or guard rings is used to limit leakage currents. In one embodiment, the monitor is used for monitoring liquids retained in a tank. Other embodiments monitor liquids flowing through a tank, and bodies of liquids, such as ponds, lakes, rivers and oceans.

  3. Communications in Statistics-Stochastic Models, 16(1), 121-142 (2000) 1 BAYESIAN MAINTENANCE POLICIES DURING A

    E-Print Network [OSTI]

    Popova, Elmira

    of maintenance policies which consist of minimal repair and preventive maintenance is analyzed for the case preventive maintenance can reduce the age of the machine by x units. Under a constant maintenance costCommunications in Statistics-Stochastic Models, 16(1), 121-142 (2000) 1 BAYESIAN MAINTENANCE

  4. The air transportation industry birthplace of reliability-centered maintenance

    SciTech Connect (OSTI)

    Matteson, T.D.

    1996-08-01T23:59:59.000Z

    The 1980s and 1970s provided a timely opportunity for examining and radically changing the process called {open_quotes}preventive maintenance{close_quotes} as it is applied to the aircraft used for scheduled air transportation. The Federal Aviation Administration and four major airlines, United, American, Pan American and Trans World, were the {open_quotes}principals{close_quotes} in that process. While United`s work with the FAA on the Boeing 737 had opened the door a crack, the Boeing 747 presented a major opportunity to radically improve the process for maintenance program design. That program was guided by the results of United`s analyses of failure data from operations of several fleets, each larger than 100 aircraft, and the concurrent experience of American, Pan American and Trans World. That knowledge provided the insights necessary to support an entirely different approach to maintenance program design. As a result, while United`s existing maintenance program required scheduled overhaul of 339 items on each DC-8, it required overhaul of only 8 items on the B-7471 Although the initial thrust of that work focused on components of active systems, there was concurrent work focused on items whose principal function was to carry the loads associated with operations. That program focused on the classification of structurally-significant items and their classification as {open_quotes}safe life{close_quotes} or {open_quotes}damage tolerant{close_quote} to determine what periodic replacements or repeated inspections were required. That work came to the attention of the Department of Defense which supported preparation of the book-length report by F. Stanley Nowlan and Howard F. Heap at United Airlines entitled {open_quote}Reliability-Centered maintenance{close_quotes}.

  5. Vibration monitoring of EDF rotating machinery using artificial neural networks

    SciTech Connect (OSTI)

    Alguindigue, I.E.; Loskiewicz-Buczak, A.; Uhrig, R.E. (Tennessee Univ., Knoxville, TN (United States). Dept. of Nuclear Engineering); Hamon, L.; Lefevre, F. (Electricite de France, 78 - Chatou (France). Direction des Etudes et Recherches)

    1991-01-01T23:59:59.000Z

    Vibration monitoring of components in nuclear power plants has been used for a number of years. This technique involves the analysis of vibration data coming from vital components of the plant to detect features which reflect the operational state of machinery. The analysis leads to the identification of potential failures and their causes, and makes it possible to perform efficient preventive maintenance. Earlydetection is important because it can decrease the probability of catastrophic failures, reduce forced outgage, maximize utilization of available assets, increase the life of the plant, and reduce maintenance costs. This paper documents our work on the design of a vibration monitoring methodology based on neural network technology. This technology provides an attractive complement to traditional vibration analysis because of the potential of neural networks to operate in real-time mode and to handle data which may be distorted or noisy. Our efforts have been concentrated on the analysis and classification of vibration signatures collected by Electricite de France (EDF). Two neural networks algorithms were used in our project: the Recirculation algorithm and the Backpropagation algorithm. Although this project is in the early stages of development it indicates that neural networks may provide a viable methodology for monitoring and diagnostics of vibrating components. Our results are very encouraging.

  6. Vibration monitoring of EDF rotating machinery using artificial neural networks

    SciTech Connect (OSTI)

    Alguindigue, I.E.; Loskiewicz-Buczak, A.; Uhrig, R.E. [Tennessee Univ., Knoxville, TN (United States). Dept. of Nuclear Engineering; Hamon, L.; Lefevre, F. [Electricite de France, 78 - Chatou (France). Direction des Etudes et Recherches

    1991-12-31T23:59:59.000Z

    Vibration monitoring of components in nuclear power plants has been used for a number of years. This technique involves the analysis of vibration data coming from vital components of the plant to detect features which reflect the operational state of machinery. The analysis leads to the identification of potential failures and their causes, and makes it possible to perform efficient preventive maintenance. Earlydetection is important because it can decrease the probability of catastrophic failures, reduce forced outgage, maximize utilization of available assets, increase the life of the plant, and reduce maintenance costs. This paper documents our work on the design of a vibration monitoring methodology based on neural network technology. This technology provides an attractive complement to traditional vibration analysis because of the potential of neural networks to operate in real-time mode and to handle data which may be distorted or noisy. Our efforts have been concentrated on the analysis and classification of vibration signatures collected by Electricite de France (EDF). Two neural networks algorithms were used in our project: the Recirculation algorithm and the Backpropagation algorithm. Although this project is in the early stages of development it indicates that neural networks may provide a viable methodology for monitoring and diagnostics of vibrating components. Our results are very encouraging.

  7. Routine environment audit of the Kansas City Plant, Kansas City, Missouri

    SciTech Connect (OSTI)

    NONE

    1994-11-01T23:59:59.000Z

    This report documents the results of the routine environmental audit of the Kansas City Plant, Kansas City, Missouri. During this audit the activities the audit team conducted included reviews of internal documents and reports from previous audits and assessments; interviews with U.S. Department of Energy (DOE) and contractor personnel; and inspections and observations of selected facilities and operations. The onsite portion of the audit was conducted October 24-November 4, 1994, by the DOE Office of Environmental Audit (EH-24), located within the Office of Environment, Safety, and Health (EH). DOE 5482.1 B, {open_quotes}Environment, Safety, and Health Appraisal Program,{close_quotes} establishes the mission of EH-24, which is to provide comprehensive, independent oversight of Department-wide environmental programs on behalf of the Secretary of Energy. The ultimate goal of EH-24 is enhancement of environmental protection and minimization of risk to public health and the environment. EH-24 accomplishes its mission by conducting systematic and periodic evaluations of the Department`s environmental programs within line organizations and by using supplemental activities that strengthen self-assessment and oversight functions within program, field, and contractor organizations. The audit evaluated the status of programs to ensure compliance with Federal, state, and local environmental laws and regulations; compliance with DOE Orders, guidance, and directives; and conformance with accepted industry practices and standards of performance. The audit also evaluated the status and adequacy of the management systems developed to address environmental requirements.

  8. Routine environmental audit of the Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    NONE

    1994-09-01T23:59:59.000Z

    This report documents the results of the routine environmental audit of the Oak Ridge Y-12 Plant (Y-12 Plant), Anderson County, Tennessee. During this audit, the activities conducted by the audit team included reviews of internal documents and reports from previous audits and assessments; interviews with U.S. Department of Energy (DOE), State of Tennessee regulatory, and contractor personnel; and inspections and observations of selected facilities and operations. The onsite portion of the audit was conducted August 22-September 2, 1994, by the DOE Office of Environmental Audit (EH-24), located within the Office of Environment, Safety and Health (EH). DOE 5482.1 B, {open_quotes}Environment, Safety, and Health Appraisal Program,{close_quotes} establishes the mission of EH-24 to provide comprehensive, independent oversight of DOE environmental programs on behalf of the Secretary of Energy. The ultimate goal of EH-24 is enhancement of environmental protection and minimization of risk to public health and the environment. EH-24 accomplishes its mission by conducting systematic and periodic evaluations of DOE`s environmental programs within line organizations, and by using supplemental activities that strengthen self-assessment and oversight functions within program, field, and contractor organizations. The audit evaluated the status of programs to ensure compliance with Federal, state, and local environmental laws and regulations; compliance with DOE Orders, guidance, and directives; and conformance with accepted industry practices and standards of performance. The audit also evaluated the status and adequacy of the management systems developed to address environmental requirements.

  9. Routine environmental audit of the Sandia National Laboratories, California, Livermore, California

    SciTech Connect (OSTI)

    Not Available

    1994-03-01T23:59:59.000Z

    This report documents the results of the Routine Environmental Audit of the Sandia National Laboratories, Livermore, California (SNL/CA). During this audit the activities the Audit Team conducted included reviews of internal documents and reports from preview audits and assessments; interviews with US Department of Energy (DOE), State of California regulators, and contractor personnel; and inspections and observations of selected facilities and operations. The onsite portion of the audit was conducted from February 22 through March 4, 1994, by the DOE Office of Environmental Audit (EH-24), located within the Office of Environment, Safety, and Health (EH). The audit evaluated the status of programs to ensure compliance with Federal, state, and local environmental laws and regulations; compliance with DOE Orders, guidance, and directives; and conformance with accepted industry practices and standards of performance. The audit also evaluated the status and adequacy of the management systems developed to address environmental requirements. The audit`s functional scope was comprehensive and included all areas of environmental management and a programmatic evaluation of NEPA and inactive waste sites.

  10. Global nuclear material monitoring

    SciTech Connect (OSTI)

    Howell, J.A.; Monlove, H.O.; Goulding, C.A.; Martinez, B.J.; Coulter, C.A.

    1997-08-01T23:59:59.000Z

    This is the final report of a one-year Laboratory-Directed Research and Development (LDRD) project at the Los Alamos National Laboratory (LANL). This project provided a detailed systems design for advanced integrated facility monitoring and identified the components and enabling technologies required to facilitate the development of the monitoring system of the future.

  11. Transmission Line Security Monitor

    ScienceCinema (OSTI)

    None

    2013-05-28T23:59:59.000Z

    The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

  12. Transmission Line Security Monitor

    SciTech Connect (OSTI)

    None

    2011-01-01T23:59:59.000Z

    The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

  13. Recompile if your codes run into MPICH error after the maintenance...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Recompile if your codes run into MPICH errors after the maintenance on 6252014 Recompile if your codes run into MPICH error after the maintenance on 6252014 June 27, 2014 (0...

  14. Automated ground maintenance and health management for autonomous unmanned aerial vehicles

    E-Print Network [OSTI]

    Dale, Daniel R., M. Eng. Massachusetts Institute of Technology

    2007-01-01T23:59:59.000Z

    Automated ground maintenance is a necessity for multi-UAV systems. Without such automation, these systems will become more of a burden than a benefit as human operators struggle to contend with maintenance operations for ...

  15. RFI Seeks Feedback on Third-party Maintenance Strategy for AMO...

    Energy Savers [EERE]

    RFI Seeks Feedback on Third-party Maintenance Strategy for AMO's Software Tools RFI Seeks Feedback on Third-party Maintenance Strategy for AMO's Software Tools July 28, 2014 -...

  16. Data quality assurance and performance measurement of data mining for preventive maintenance of power grid

    E-Print Network [OSTI]

    Wu, Leon

    2011-01-01T23:59:59.000Z

    Ensuring reliability as the electrical grid morphs into the "smart grid" will require innovations in how we assess the state of the grid, for the purpose of proactive maintenance, rather than reactive maintenance; in the ...

  17. DOE Order Self Study Modules - DOE O 433.1B, Maintenance Management...

    Broader source: Energy.gov (indexed) [DOE]

    for post-maintenance testing? 6. What is the objective of a good equipment maintenance history program? 7. What are three conditions that should be addressed in a severe conditions...

  18. INCORPORATING INCREMENTAL VALIDATION AND IMPACT ANALYSIS INTO SPREADSHEET MAINTENANCE: AN EMPIRICAL STUDY

    E-Print Network [OSTI]

    Rothermel, Gregg

    serious consequences; for example, a Dallas oil and gas company lost millions of dollars in an acquisition1 INCORPORATING INCREMENTAL VALIDATION AND IMPACT ANALYSIS INTO SPREADSHEET MAINTENANCE: spreadsheets, maintenance, testing, impact analysis, empirical study, visual programming 1. INTRODUCTION

  19. Policy #1001 Development, Approval and Maintenance of University Policy 1 OLD DOMINION UNIVERSITY

    E-Print Network [OSTI]

    Policy #1001 ­ Development, Approval and Maintenance of University Policy 1 OLD DOMINION UNIVERSITY University Policy Policy #1001 DEVELOPMENT, APPROVAL AND MAINTENANCE OF UNIVERSITY POLICY Responsible 4, 2012 A. PURPOSE This policy defines the process for developing, reviewing, approving

  20. Project Profile: Maintenance-Free Stirling Engine for High-Performance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Maintenance-Free Stirling Engine for High-Performance Dish CSP Project Profile: Maintenance-Free Stirling Engine for High-Performance Dish CSP Image of a prototype 30-kW Stirling...

  1. Perceived Barriers to Post-release Participation in Methadone Maintenance Treatment: Perspectives of Compulsory Drug Detoxification Center Detainees in Yunnan, China

    E-Print Network [OSTI]

    Hsieh, Julie

    2013-01-01T23:59:59.000Z

    Effectiveness of Methadone Maintenance Treatment. Springer:of the methadone maintenance therapy program in China.attending methadone maintenance therapy: a qualitative study

  2. Low Protein Nitrogen Appearance as a Surrogate of Low Dietary Protein Intake Is Associated with Higher All-Cause Mortality in Maintenance Hemodialysis Patients1 2 3

    E-Print Network [OSTI]

    2013-01-01T23:59:59.000Z

    inflammation complex in maintenance dialysis patients. J Renindex and survival in maintenance hemodialysis patients. Amdose and membrane flux in maintenance hemodialysis. N Engl J

  3. The Role of Two Homeodomain Genes PENNYWISE(PNY) and POUNDFOOLISH(PNF) in Regulating Meristem Maintenance of Shoot Apical Meristem

    E-Print Network [OSTI]

    Wu, Shang

    2012-01-01T23:59:59.000Z

    2004). Although meristem maintenance is not visibly alteredto facilitate meristem maintenance and organ separation (Leeremodeling in stem cell maintenance in Arabidopsis thaliana.

  4. CHANGES IN THE ELECTRICAL SURFACE CHARGE AND TRANSPLANTATION PROPERTIES OF TA3 ASCITES TUMOR CELLS DURING SHORT-TERM MAINTENANCE IN AN ISOTONIC SALT SOLUTION

    E-Print Network [OSTI]

    Tenforde, T.S.

    2013-01-01T23:59:59.000Z

    CELLS DURING SHORT-TERM MAINTENANCE IN AN ISOTONIC SALTcells. In conclusion, the maintenance of TA3 ascites cellslhort-term tumor cell maintenance in vitro. REFERENCES

  5. Career opportunities Dental hygiene is routinely listed as one of today's top-ten career fields, offering

    E-Print Network [OSTI]

    Career opportunities Dental hygiene is routinely listed as one of today's top-ten career fields for all other occupations. Dental hygiene at Wichita State Wichita State is the only school in the state of Kansas to offer bachelor's degrees in dental hygiene and provides two programs for students to choose

  6. Certificating Vehicle Public Key with Vehicle Attributes A (periodical) Licensing Routine, Against Man-in-the-Middle

    E-Print Network [OSTI]

    Certificating Vehicle Public Key with Vehicle Attributes A (periodical) Licensing Routine, Against actions among vehicles in traffic by the use of wireless transceivers. Unfortunately, the wireless communication among vehicles is vulnerable to security threats that may lead to very serious safety hazards

  7. Facility-Level and System-Level Stochastic Optimization of Bridge Maintenance Policies for Markovian Management Systems

    E-Print Network [OSTI]

    Robelin, Charles-Antoine

    2006-01-01T23:59:59.000Z

    Cost of a maintenance action as a function of the conditionUnit cost of maintenance and repair for the system of 20of infrastructure maintenance and inspection policies under

  8. Joint scheduling of jobs and preventive maintenance operations in the flowshop sequencing problem: A resolution with sequential and integrated

    E-Print Network [OSTI]

    Boyer, Edmond

    Joint scheduling of jobs and preventive maintenance operations in the flowshop sequencing problem study on joint production and preventive maintenance scheduling strategies regarding flowshop problems, Preventive maintenance, Joint scheduling, GA, Taboo search, NEH heuristic, Flowshop. 1. Introduction

  9. Fusion Engineering and Design 80 (2006) 161180 ARIES-AT maintenance system definition and analysis

    E-Print Network [OSTI]

    California at San Diego, University of

    2006-01-01T23:59:59.000Z

    Fusion Engineering and Design 80 (2006) 161­180 ARIES-AT maintenance system definition and analysis maintenance of the power core. The short core refurbishment time coupled, with evolutionary improvements; Maintenance; Availability; Power core; Vacuum vessel 1. Introduction The ARIES studies, sponsored by DOE

  10. SCHEDULED AND SHM STRUCTURALAIRFRAME MAINTENANCE APPLICATIONS USING A NEW PROBABILISTIC MODEL

    E-Print Network [OSTI]

    Boyer, Edmond

    philosophies have therefore evolved towards the preventive condition-based maintenance [3,4]. This conceptSCHEDULED AND SHM STRUCTURALAIRFRAME MAINTENANCE APPLICATIONS USING A NEW PROBABILISTIC MODEL Léa D.cot@insa-toulouse.fr ABSTRACT This paper focuses on aircraft structure maintenance. A general mathematical framework based

  11. `ODDS ALGORITHM'-BASED OPPORTUNITY-TRIGGERED PREVENTIVE MAINTENANCE WITH PRODUCTION POLICY

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    1 `ODDS ALGORITHM'-BASED OPPORTUNITY-TRIGGERED PREVENTIVE MAINTENANCE WITH PRODUCTION POLICY THOMAS.monnin}@cran.uhp-nancy.fr Abstract: In the field of manufacturing, the planning of opportunistic preventive maintenance actions' (Bruss algorithm), opportunistic preventive maintenance. 1. INTRODUCTION With today's growing demand

  12. Optimizing with constraints: a case study in scheduling maintenance of electric power units

    E-Print Network [OSTI]

    Dechter, Rina

    industry is that of optimally schedul­ ing preventative maintenance of power generating units within of the electric power industry: optimally scheduling preventative maintenance of power generating units within or two dozen power generating units which can be individually scheduled for preventive maintenance. Both

  13. GENERATION D'INDICATEURS DANS LE CADRE D'UNE POLITIQUE DE MAINTENANCE PREVENTIVE CONDITIONNELLE

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    GENERATION D'INDICATEURS DANS LE CADRE D'UNE POLITIQUE DE MAINTENANCE PREVENTIVE CONDITIONNELLE Indicators generation as part of a policy of conditional preventive maintenance Pascal VRIGNAT, Manuel AVILA DE MAINTENANCE PREVENTIVE CONDITIONNELLE, Tours : France (2012)" #12;- le système se dégrade

  14. Methodology for assessing system performance loss within a proactive maintenance framework

    E-Print Network [OSTI]

    Boyer, Edmond

    role, the practices are required to move from corrective maintenance to preventive and even proactiveMethodology for assessing system performance loss within a proactive maintenance framework P,alexandre.voisin,eric.levrat,benoit.iung}@cran.uhp-nancy.fr) Abstract: Maintenance plays now a critical role

  15. Mathematical optimization of a flexible job shop problem including preventive maintenance and

    E-Print Network [OSTI]

    Patriksson, Michael

    1 Mathematical optimization of a flexible job shop problem including preventive maintenance as the scheduling problem includes limited availability of fixtures and preventive maintenance planning periodicity, a number of preventive maintenance activities need to be carried out in some of the resources

  16. A Tool to Support Knowledge Based Software Maintenance: The Software Service Jonathan I. Maletic

    E-Print Network [OSTI]

    Maletic, Jonathan I.

    ]: · Corrective · Perfective · Adaptive · Preventive/ Preservation Corrective maintenance is the correction, and corrective were originally used by Swanson [15]. Preventive maintenance is done to improve the future,8,14,12] and preventive maintenance is rarely done. However, it is assumed that a good software development methodology

  17. Scheduling predictive maintenance in flow-shop Christophe Varnier, Noureddine Zerhouni

    E-Print Network [OSTI]

    Boyer, Edmond

    . Predictive maintenance is an answer to prevent equipment from risk of breakdowns while minimizing, for each machine, the control mode and if necessary the preventive maintenance plan. I. INTRODUCTION to prevent equipment from risk of breakdowns while minimizing the maintenance costs. Nevertheless, conflicts

  18. MTTF of a 1 out of n system with preventive maintenance Christiane CocozzaThivent

    E-Print Network [OSTI]

    Cocozza-Thivent, Christiane

    MTTF of a 1 out of n system with preventive maintenance Christiane Cocozza­Thivent Universit´e de. The working item is submitted to an age preventive maintenance: when this item reachs age a, it is replaced by a waiting item if there is one. If not the system fails. The duration of the preventive maintenance is equal

  19. LS-SVM based regression and spectral clustering for predicting maintenance of machines

    E-Print Network [OSTI]

    with sensory3 faults have been used [? ],[? ],[? ]: corrective maintenance, preventive main-4 tenance, manual the machine fails, it is expensive and6 safety and environmental issues arise. Preventive maintenance is basedLS-SVM based regression and spectral clustering for predicting maintenance of machines Rocco

  20. How Much Does Unused Code Matter for Maintenance? Sebastian Eder, Maximilian Junker, Elmar Jurgens, Benedikt Hauptmann

    E-Print Network [OSTI]

    effort can thus be expected to be low. On the other hand, however, preventive and adaptive maintenance [3. The remaining changes comprise adaptive and preventive maintenance. We thus have to expect unnecessary codeHow Much Does Unused Code Matter for Maintenance? Sebastian Eder, Maximilian Junker, Elmar J