National Library of Energy BETA

Sample records for routine maintenance andrew

  1. Andrew Weaver

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Andrew Weaver Andrew Weaver WeaverA.jpg Andrew R. Weaver Site Reliability Engineer Operations Technology Group arweaver@lbl.gov Phone: (510) 486-6821 Fax: (510) 486-4316 1 Cyclotron Road Mail Stop 59-4010A Berkeley, CA 94720 Biographical Sketch Last edited: 2016-07-15 13:38:15

  2. Allison Andrews

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    filesystems to HPSS. Conference Papers Neal Master, Matthew Andrews, Jason Hick, Shane Canon, Nicholas J. Wright, "Performance Analysis of Commodity and Enterprise Class Flash...

  3. Andrew Lake

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Andrew Lake About ESnet Our Mission The Network ESnet History Governance & Policies Career Opportunities ESnet Staff & Org Chart ESnet Leadership Administration Advanced Network Technologies Cybersecurity Infrastructure, Identity & Collaboration Network Engineering Network Planning Operational Enhancements Office of the CTO Science Engagement Tools Team Contact Us Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1 800-333-7638 (Inside US) 1 510-486-7600 (Globally) 1

  4. The feasibility of replacing or upgrading utility distribution transformers during routine maintenance

    SciTech Connect (OSTI)

    Barnes, P.R.; Van Dyke, J.W.; McConnell, B.W.; Cohn, S.M.; Purucker, S.L.

    1995-04-01

    It is estimated that electric utilities use about 40 million distribution transformers in supplying electricity to customers in the United States. Although utility distribution transformers collectively have a high average efficiency, they account for approximately 61 billion kWh of the 229 billion kWh of energy lost annually in the delivery of electricity. Distribution transformers are being replaced over time by new, more efficient, lower-loss units during routine utility maintenance of power distribution systems. Maintenance is typically not performed on units in service. However, units removed from service with appreciable remaining life are often refurbished and returned to stock. Distribution transformers may be removed from service for many reasons, including failure, over- or underloading, or line upgrades such as voltage changes or rerouting. When distribution transformers are removed from service, a decision must be made whether to dispose of the transformer and purchase a lower-loss replacement or to refurbish the transformer and return it to stock for future use. This report contains findings and recommendations on replacing utility distribution transformers during routine maintenance, which is required by section 124(c) of the Energy Policy Act of 1992. The objectives of the study are to evaluate the practicability, cost-effectiveness, and potential energy savings of replacing or upgrading existing transformers during routine utility maintenance and to develop recommendations on was to achieve the potential energy savings.

  5. Andrew Ells | Photosynthetic Antenna Research Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ells Andrew Ells Andrew Ells Undergraduate Student E-mail: andrew.ells@wustl.edu Website: Washington University...

  6. ____ Kimberly M. Andrews_____

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    KIMBERLY M. ANDREWS curriculum vitae University of Georgia Savannah River Ecology Laboratory ▪ Drawer E ▪ Aiken, SC 29802 Jekyll Island State Park Georgia Sea Turtle Center ▪ 100 James Rd ▪ Jekyll Island, GA 31527 Cell: (803)270-7880 ▪ Office: (912)635-4137 ▪ Fax: (803)725-3309 ▪ andrews@srel.uga.edu http://wildlifelab.wix.com/jekyllresearch https://www.facebook.com/AppliedWildlifeConservationLab updated August 2016 EDUCATION Ph.D. Ecology - University of Georgia 2010 Advisor: J

  7. Andrew Gordon | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Andrew Gordon About Us Andrew Gordon - SLAC National Accelerator Laboratory Andrew Gordon is the External Communications Manager at SLAC National Accelerator Laboratory, one of the Department of Energy's 17 National Laboratories. Most Recent The World's Most Powerful X-ray Laser is Getting an Upgrade June 21 Accelerator on a Chip February 4

  8. Andrew Gumbiner | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Andrew Gumbiner About Us Andrew Gumbiner - Contractor, Advanced Research Projects Agency-Energy. Andrew Gumbiner is a contractor with the Advanced Research Projects Agency-Energy. Most Recent PNNL Helps the Navy Stay Cool and Conserve Fuel July 30 Fluidic: Grid-Scale Batteries for Wind and Solar February 27 Ceres: Making Biofuels Bigger and Better February 15

  9. George Andrew Olah - Patents

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Patents - George Andrew Olah Olah Page * Resources with Additional Information US 4,394,247 LIQUEFACTION OF COALS USING RECYCLABLE SUPERACID CATALYST - Olah, George A.; July 19, 1983 This invention discloses a process for the liquefaction of coals and other predominantly hydrocarbonaceous materials by treating the same with a superacidic catalyst system consisting of anhydrous hydrogen fluoride and boron trifluoride in the presence of super-atmospheric hydrogen. US 4,433,192 CONDENSATION OF

  10. Mr. Andrew Wallo, III

    Office of Legacy Management (LM)

    ,- -.-=* Stub 4000. ,955 L' EnJan: Plaza. 5. W.. Wahington. D. C. 20021. T&phone: (20.2) 188.6000 7117-03.87.cdy.02 13 January 1987 Mr. Andrew Wallo, III Division of Facility & Site Decommissioning Projects U.S. Department of E,nergy Germantown, Maryland 20545 Dear Mr. Wallo: CONTACT REPORT - DISCUSSIONS WITH MR. WILLIAM A. HOOPER MANAGER, PLANT ENGINEERING, ALLIED BENDIX AEROSPACE SECTOR TETERBORO, NEW JERSEY Per your request, the undersigned contacted Mr. William A. Hooper on 8 January

  11. St Andrews Fuel Cells | Open Energy Information

    Open Energy Info (EERE)

    St Andrews Fuel Cells Place: Fife, Scotland, United Kingdom Product: A spin-out fuel cell company from the University of St Andrews to work on further prototypes of St Andrews'...

  12. Profile for Nathan Andrew Moody

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nathan Andrew Moody Profile Pages View homepages for scientists and researchers. Explore potential collaborations and project opportunities. Search the extensive range of capabilities by keyword to quickly find who and what you are looking for. submit Nathan Andrew Moody Nathan Moody Email Phone (505) 667-1502 Capabilities Accelerators and Electrodynamics High power linear accelerator science and technology Free-electron laser (FEL) High-power radio frequency systems High current particle

  13. EA-1982: Parker-Davis Transmission System Routine Operation and Maintenance Project and Proposed Integrated Vegetation Management Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    Western Area Power Administration prepared an EA that assesses potential environmental impacts of the proposed continuation of operation and maintenance activities and implementation of a vegetation management program on Western’s Parker-Davis Transmission System in Arizona, California, and Nevada. These actions would occur on existing transmission line and access road rights-of-way, and at substations and maintenance facilities associated with the transmission system.

  14. Andrew Cherry | Argonne Leadership Computing Facility

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Andrew Cherry HPC Systems Administration Specialist Andrew Cherry Argonne National Laboratory 9700 South Cass Avenue Building 240 - Rm. 2123 Argonne, IL 60439 630-252-4296 acherry@alcf.anl

  15. Andrew Shreve | Photosynthetic Antenna Research Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Andrew Shreve Andrew Shreve Andrew Shreve Andrew Shreve Principal Investigator E-mail: shreve@unm.edu Phone: 505.277.4939 Principal Investigator and Themes 1 & 3 Member Dr. Shreve assists in characterizing natural and synthetic photosynthetic light-harvesting systems and develops experimental-based models of energy transfer in mesoscale light-harvesting systems. Professor, Chemical and Nuclear Engineering; Director Center for Biomedical Engineering Albuquerque, New Mexico 87131 Principal

  16. Andrew Novick | Photosynthetic Antenna Research Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Andrew Novick Andrew Novick Andrew Novick Undergraduate Student E-mail: novick@wustl.edu Website: Washington University in St. Louis Undergraduate student enrolled in the PARC/I-CARES Certificate of Accomplishment in Renewable Energy & the Environment. Undergraduate Students

  17. Andrew C. Lawrence | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    C. Lawrence About Us Andrew C. Lawrence - Director, Office of Environmental Protection, Sustainability Support, and Corporate Safety Analysis Andrew C. Lawrence Andrew Lawrence is the Director of the Office of Environmental Protection, Sustainability Support, and Corporate Analysis within the Office of the Associate Under Secretary for Environment, Health, Safety and Security (AU). He is responsible for establishing environmental protection policy, requirements and expectations for the

  18. Andrew Weston-Dawkes | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Weston-Dawkes About Us Andrew Weston-Dawkes - Director, Office of Classification Andrew Weston-Dawkes Dr. Andrew Weston-Dawkes is the Director for the Office of Classification within the Office of Environment, Health, Safety and Security. The Office of Classification manages the Government-wide program to classify and declassify nuclear weapons-related technology as authorized under the Atomic Energy Act of 1954 and implements the requirements of Executive Order 13526 regarding the

  19. Jefferson Lab Leadership Council - Dr. Andrew Hutton

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Accelerator Associate Director, Dr. Andrew Hutton Andrew Hutton Associate Director of the Accelerators Dr. Andrew Hutton is the Associate Director of Accelerators at Jefferson Lab, heading a Division of 150 accelerator scientists, engineers and technicians. He has more than 40 years of experience in all aspects of forefront accelerator projects (LEP, SLC, PEP-II, CEBAF - the Continuous Electron Beam Accelerator Facility) including project definition, design, creating a project team,

  20. Andrew Gorton | Inventors | GE Global Research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Andrew Gorton Andrew Gorton Senior Engineer Vibration Click to email this to a friend (Opens in new window) Share on Facebook (Opens in new window) Click to share (Opens in new window) Click to share on LinkedIn (Opens in new window) Click to share on Tumblr (Opens in new window) "I try and tackle each challenge with conviction and focus. I am always asking the question 'why not?'" -Andrew Gorton When Andrew Gorton tackles a new challenge, the first question he always asks is "why

  1. Interested Parties - Smith Dawson & Andrews | Department of Energy

    Office of Environmental Management (EM)

    Smith Dawson & Andrews Interested Parties - Smith Dawson & Andrews 09-03-10SmithDawsonAndrews.pdf (37.05 KB) More Documents & Publications Interested Parties - ARPA-E National ...

  2. 09-03-10_Smith_Dawson_Andrews.pdf

    Broader source: Energy.gov (indexed) [DOE]

    C. Cronin Senior Legislative Associate Smith Dawson & Andrews Mary inquired about which ... Legislative Associate Firm or Organization, if applicable: Smith Dawson & Andrews Client:

  3. Kimberly Andrews | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Andrews with kingsnake Curriculum Vitae Faculty & Scientists SREL Home SREL Herpetology Kimberly Andrews Savannah River Ecology Laboratory P O Drawer E, Aiken, SC 29802 (803) 725-9793 office (803) 725-3309 fax andrews(at)srel.uga.edu Kimberly received her PhD in Ecology (2010) from the University of Georgia’s Odum School of Ecology through work at the Savannah River Ecology Laboratory (UGA SREL) under the advisement of Dr. Whit Gibbons. Kimberly also holds an M.S. in Conservation Ecology

  4. Andrew Hutton Named Head of Jefferson Lab's Accelerator Division |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Andrew Gordon About Us Andrew Gordon - SLAC National Accelerator Laboratory Andrew Gordon is the External Communications Manager at SLAC National Accelerator Laboratory, one of the Department of Energy's 17 National Laboratories. Most Recent The World's Most Powerful X-ray Laser is Getting an Upgrade June 21 Accelerator on a Chip February Jefferson Lab

    Andrew Hutton Named Head of Jefferson Lab's Accelerator Division Andrew Hutton Named Head of Jefferson Lab's Accelerator Division March

  5. Andrew P Zwicker | Princeton Plasma Physics Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Andrew P Zwicker Head, Science Education Andrew Zwicker is a physicist and science educator. A fellow of the American Physical Society, The American Association of Physics Teachers has named him to its list of 75 leading contributors to physics education. He is the Editor of the APS Forum on Physics and Society's newsletter and a past chair of that Forum. Additionally, he is a past member of the APS Committee on Education. At Princeton University he is a lecturer in the Writing Program and a

  6. M r. Andrew Wallo, III, NE-23

    Office of Legacy Management (LM)

    300.955 L*Enfom Plaza, S. Iv.. Washrhington. D.C. 200242174, Tekphonc (202) 7117-03.87.cdy.43 23 September 1987 M r. Andrew Wallo, III, NE-23 Division of Facility & Site Deconnnissioning Projects U.S. Department of Energy Germantown, Maryland 20545 Dear M r. Wallo: ELIMINATION RECOMMENDATION -- COLLEGES AND UNIVERSITIES The attached elimination recommendation was prepared in accordi with your suggestion during our meeting on 22 September. The reconu includes 26 colleges and universities

  7. Rob Andrews Joshua Pearce, Andrew Pollard Queen's University Department of Mechanical and Materials Engineering

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Snowfall on PV Systems Rob Andrews Joshua Pearce, Andrew Pollard Queen's University Department of Mechanical and Materials Engineering Calama Consulting (www.calamaconsulting.ca) andrewsr@me.queensu.ca 613-530-0323 Presented at the 2013 Sandia PV Performance Modeling Workshop Santa Clara, CA. May 1-2, 2013 Published by Sandia National Laboratories with the Permission of the Author. 13-4-22 Snow on PV ● How do we measure the effects of snow on PV? ● How can we distinguish snowfall effects

  8. Mr. Andrew Wallo, III, NE-23

    Office of Legacy Management (LM)

    300, 955 L'E~~MI Phm.SW.:. Washin@on. LX. 200242174, T~kphonc(202)48ll. 5 7117-03.87.cdy.43 23 September 1987 cA Mr. Andrew Wallo, III, NE-23 Division of Facility & Site Decommissioning Projects U.S. Department of Energy Germantown, Maryland 20545 Dear Mr. Wallo: ELIMINATION RECOMMENDATION -- COLLEGES AND UNIVERSITIES M/).0-05 pl 0.0% The attached elimination recommendation was prepared in accordance ML.05 with your suggestion during our meeting on 22 September. The recommendation flD.o-02

  9. Mr. Andrew Wallo, III, NE-23

    Office of Legacy Management (LM)

    9% L'Enfam Plaza, S, W.. Warhin@on, D.C. 2002ijl74j Tekphow (202) 488ddO 7117-03.87.cdy.'i3 23 September 1967 ~ s ~ Mr. Andrew Wallo, III, NE-23 Oivision of Facility & Site Decommissioning Projects U.S. Department of Energy Germantown, Maryland 20545 Dear Mr. Wallo: ELIMINATION RECOMMENDATION -- COLLEGES AND IJNIVFRSITIES , The attached elimination reconnnendation was prepar!ad in accordance with your suggestion during our meeting on 22 September! The recommendation includes 26 colleges and

  10. Mr. Andrew Wallo, III, NE-23

    Office of Legacy Management (LM)

    suite 7900,955 L%l/onr Plaza, S. W., Washingion, D.C. 20024.?174,, Telephone: (202) 488.~ Mr. Andrew Wallo, III, NE-23 Division of Facility & Site Decommissioning Projects U.S. Department of Energy Germantown, Maryland 20545 7117~03.87.dy.43 23 September 1987 I j / Dear Mr. Wallo: I ELIMINATION RECOMMENDATION -- COLLEGES AND UN&ITIES I . The attached elimination recommendation was prepared in accordance with your suggestion during our meeting on 22 September!. The recommend includes 26

  11. CA Mr. Andrew Wallo, III, NE-23

    Office of Legacy Management (LM)

    ?9OQ, 95.5 L'E&nt Plaza, SW.. W.ashin@.m, D.C. 20024.2174, Tekphone: (202) 488AQOO 7117-03.B7.cdy.43 23 September 1987 CA Mr. Andrew Wallo, III, NE-23 Division of Facility & Site Decommissioning Projects U.S. Oepartment of Energy Germantown, Maryland 20545 Dear Mr. Wallo: ELIMINATION RECOMMENDATION -- COLLEGES AND UNIVERSITIES zh/ ! o-01 lM!tl5 ML)!o-05 PI 77!0> The attached elimination recoannendation was prepared in accordance . -1 rlL.0~ with your suggestion during our meeting on

  12. antagonist Manglik, Aashish; Kruse, Andrew C.; Kobilka, Tong...

    Office of Scientific and Technical Information (OSTI)

    bound to a morphinan antagonist Manglik, Aashish; Kruse, Andrew C.; Kobilka, Tong Sun; Thian, Foon Sun; Mathiesen, Jesper M.; Sunahara, Roger K.; Pardo, Leonardo; Weis,...

  13. VBH-0071- In the Matter of Raymond Gallegos; Andrew Sanchez

    Broader source: Energy.gov [DOE]

    This Initial Agency Decision concerns a whistleblower complaint filed by Raymond Gallegos and Andrew Sanchez (the Complainants) against their previous employer, Business Environments (BE), under...

  14. VBH-0070- In the Matter of Raymond Gallegos; Andrew Sanchez

    Broader source: Energy.gov [DOE]

    This Initial Agency Decision concerns a whistleblower complaint filed by Raymond Gallegos and Andrew Sanchez (the Complainants) against their previous employer, Business Environments (BE), under...

  15. Statement from DOE's Chief Spokesperson Andrew Beck Regarding...

    Office of Environmental Management (EM)

    Strategic Petroleum Reserve Oil Deliveries Statement from DOE's Chief Spokesperson Andrew Beck Regarding Strategic Petroleum Reserve Oil Deliveries September 11, 2008 - 3:20pm ...

  16. Statement from DOE's Chief Spokesperson Andrew Beck Regarding...

    Office of Environmental Management (EM)

    Strategic Petroleum Reserve Oil Statement from DOE's Chief Spokesperson Andrew Beck Regarding Delivery of Strategic Petroleum Reserve Oil September 14, 2008 - 3:43pm Addthis ...

  17. Statement from DOE's Chief Spokesperson Andrew Beck Regarding...

    Energy Savers [EERE]

    Citgo's Request for Oil from the Strategic Petroleum Reserve Statement from DOE's Chief Spokesperson Andrew Beck Regarding Citgo's Request for Oil from the Strategic Petroleum ...

  18. Maria Cadeddu, James C. Liljegren, and Andrew Pazmany Decision...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Retrievals from a New 183-GHz Water Vapor Radiometer in the Arctic Maria Cadeddu, James C. Liljegren, and Andrew Pazmany Decision and Information Sciences Division, Argonne...

  19. Statement from DOE's Chief Spokesperson Andrew Beck Regarding...

    Energy Savers [EERE]

    SPR Oil to Marathon Petroleum Company Statement from DOE's Chief Spokesperson Andrew Beck Regarding Delivery of SPR Oil to Marathon Petroleum Company September 8, 2008 - 3:20pm ...

  20. From: Tunnell, Andrew To: Congestion Study Comments Subject:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    RE: Southern Companies" Comments to Draft National Electric Transmission Congestion Study Date: Monday, October 20, 2014 3:28:05 PM Attachments: DOE Congestion Comments.pdf I'm resending the comments described below as I did not receive any confirmation email. Please contact me at the number provided below if there is anything else that needs to be done in this regard. Thanks Andrew Tunnell From: Tunnell, Andrew Sent: Monday, October 20, 2014 2:17 PM To:

  1. US Department of Energy - Maintenance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Howdy fellow energy adventurer Energy.gov is currently undergoing routine maintenance that will make it even more awesome. Please try again in a few minutes. We...

  2. Statement from DOE's Chief Spokesperson Andrew Beck Regarding Citgo's

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Request for Oil from the Strategic Petroleum Reserve | Department of Energy Citgo's Request for Oil from the Strategic Petroleum Reserve Statement from DOE's Chief Spokesperson Andrew Beck Regarding Citgo's Request for Oil from the Strategic Petroleum Reserve September 2, 2008 - 3:20pm Addthis Strategic Petroleum Reserve, SPR WASHINGTON, DC- On Tuesday, September 2, 2008, the U.S. Department of Energy received a formal request from Citgo's Lake Charles, Louisiana refinery for 250,000 barrels

  3. Microsoft PowerPoint - 5 Bob Andrews [Compatibility Mode]

    Office of Environmental Management (EM)

    Bill Wilborn UGTA Activity Lead U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office Bob Andrews Navarro-INTERA December 12, 2014 Nevada National Security Site Underground Test Area (UGTA) Flow and Transport Modeling - Approach and Example Page 2 Page 2Title ID 876 - December 2014 - Page 2 Log No. 2014-231 * Nevada National Security Site (NNSS) * Environmental Management (EM) mission at NNSS * Federal Facility Agreement and Consent Order (FFACO) * UGTA

  4. CA CAIOlf Mr. Andrew Wallo. III, NE-23

    Office of Legacy Management (LM)

    kire 7900. 955 L*E,,fa,u PLUG S. W.. Washin@ on. D.C. 20024-2174, Tekphme: (202) 488-6000 7117-03.87.cdy.43 23 September 1987 CA CAIOlf Mr. Andrew Wallo. III, NE-23 Division of Facility & Site Decommissioning Projects U.S. Department of Energy Germantown, Maryland 20545 CT.05 FL .0-o/ lti.Ob id.Or Dear Mr. Wallo: In/. O-01 flA.05 ELIMINATION RECOMMENDATION -- COLLEGES AND UNIVERSITIES Mbj.o-03 I4 v.o+ The attached elimination recommendation was prepared in accordance ML.o= with your

  5. CA M r. Andrew Wallo, III, NE-23

    Office of Legacy Management (LM)

    i900,9SS L%nfam Phm, S. W.. Washington. D.C. 20024.2174, Tlkphme: (20.7) 4S.S-M)o 7117-03.87.cdy.43 23 September 1987 CA M r. Andrew Wallo, III, NE-23 Division of Facility & Site Decommissioning Projects U.S. Department of Energy Germantown, Maryland 20545 Dear M r. Wallo: ELIMINATION RECOMMENDATION -- COLLEGES AND UNIVERSITIES I - The attached elimination recommendation was prepared in accordance M1.oS with your suggestion during our meeting on 22 September. The recommendation nO.O-02

  6. CA M r. Andrew Wallo, III. NE-23

    Office of Legacy Management (LM)

    i5W 95.5 L' E&nt plom. S. W.:. Washingr on. D.C. ZOOX2i74, Tekphm: (202) 488-6OGb 7II7-03.87.cdy.43 23 September 1987. Ii CA M r. Andrew Wallo, III. NE-23 Division of Facility & Site Decommissioning Projects U.S. Department of Energy Germantown, Maryland 20545 Dear M r. Wallo: ELIMINATION RECOMMENDATION -- COLLEGES AND UNIVERSITIES pqq.0' 05 PI ;p.03- The attached elimination recommendation was prepared in accordance ,I ML.05 with your suggestion during our meeting on 22 September. The

  7. Dr Andrew R Schwartz | U.S. DOE Office of Science (SC)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Andrew R Schwartz Basic Energy Sciences (BES) BES Home About Organization Chart .pdf file ... He served on the committee that developed and executed the inaugural DOE Office of ...

  8. Managing routine bioassay requirements

    SciTech Connect (OSTI)

    Baumann, B.L., Westinghouse Hanford, Richland, WA

    1997-10-08

    The Hanford Site is a very diverse Department of Energy (DOE) Nuclear Site in Eastern Washington State that includes: retired reactor facilities, spent fuel storage facilities, chemical separations facilities, laboratories, and plutonium separations facilities. As a result worker routine bioassays requirements may include routine whole body counting for mixed fission products, chest counting for uranium or plutonium, and/or urinalyses for plutonium, ura@u@ strontium-90, and tritium depending on work assignments. In such a situation it is easy to perform unnecessary bioassays and incur unnecessary cost. Program Implementation Fluor Daniel Hanford has been working with the Pacific Northwest National. Laboratories to reduce the number of routine bioassays in the internal dosimetry program while ensuring the program is compliant with regulatory requirements. This has been accomplished by: 1. Clearly identifying what work requires routine bioassay 2. Clearly identifying what routine bioassay is required 3. Having a system in place to make sure personnel who need routine bioassay get it and 4. Taking measures to ensure that workers who doiVt need routine bioassay don`t get it.

  9. Web Maintenance

    Broader source: Energy.gov [DOE]

    EERE expects its offices to review and maintain their online content on an ongoing basis throughout the year. This includes two kinds of maintenance:technical maintenanceandcontent maintenance....

  10. Session Name: Data Transfer (session D2SD) Co-Chairs: Andrew...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Data Transfer (session D2SD) Co-Chairs: Andrew Cherry, Eli Dart 1 Contributors * Curt ... monitoring o Most sites run perfSONAR * Dedicated data paths for some programs (e.g. ...

  11. DOE-CX-00073-Rev2-Routine-Maintenance.pdf

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

  12. CX-00069_PNNL_Routine_Maintenance_300_Area.pdf

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

  13. CX_00073_CHPRC_Annual_Routine_Maintenance.pdf

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

  14. Malcolm J. Andrews, 2006 | U.S. DOE Office of Science (SC)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Malcolm J. Andrews, 2006 The Ernest Orlando Lawrence Award Lawrence Award Home Nomination & Selection Guidelines Award Laureates 2010's 2000's 1990's 1980's 1970's 1960's Ceremony The Life of Ernest Orlando Lawrence Contact Information The Ernest Orlando Lawrence Award U.S. Department of Energy SC-2/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-2411 E: Email Us 2000's Malcolm J. Andrews, 2006 Print Text Size: A A A FeedbackShare Page National Security and

  15. Andrew A. Benson, 1962 | U.S. DOE Office of Science (SC)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Andrew A. Benson, 1962 The Ernest Orlando Lawrence Award Lawrence Award Home Nomination & Selection Guidelines Award Laureates 2010's 2000's 1990's 1980's 1970's 1960's Ceremony The Life of Ernest Orlando Lawrence Contact Information The Ernest Orlando Lawrence Award U.S. Department of Energy SC-2/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-2411 E: Email Us 1960's Andrew A. Benson, 1962 Print Text Size: A A A FeedbackShare Page Life Sciences: For

  16. Andrew M. Sessler, 1970 | U.S. DOE Office of Science (SC)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Andrew M. Sessler, 1970 The Ernest Orlando Lawrence Award Lawrence Award Home Nomination & Selection Guidelines Award Laureates 2010's 2000's 1990's 1980's 1970's 1960's Ceremony The Life of Ernest Orlando Lawrence Contact Information The Ernest Orlando Lawrence Award U.S. Department of Energy SC-2/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-2411 E: Email Us 1970's Andrew M. Sessler, 1970 Print Text Size: A A A FeedbackShare Page Physics for may

  17. Andrew Sessler, 2013 | U.S. DOE Office of Science (SC)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Andrew Sessler, 2013 The Enrico Fermi Award Fermi Award Home Nomination & Selection Guidelines Award Laureates 2010's 2000's 1990's 1980's 1970's 1960's 1950's Ceremony The Life of Enrico Fermi Contact Information The Enrico Fermi Award U.S. Department of Energy SC-2/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-2411 E: Email Us 2010's Andrew Sessler, 2013 Print Text Size: A A A FeedbackShare Page Citation For advancing accelerators as powerful tools of

  18. ARM - Field Campaign - Routine AAF CLOWD Optical Radiative Observation...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and flight patterns used. Steering Committee: Andrew Vogelmann, Greg McFarquhar, John Ogren, Dave Turner, Jennifer Comstock, Graham Feingold, and Chuck Long Other Contacts...

  19. To: Department of Energy From: Andrew deLaski, Appliance Standards Awareness Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy From: Andrew deLaski, Appliance Standards Awareness Project Date: February 12, 2015 RE: ex parte communication On January 14, representatives of energy efficiency advocates and fan manufacturers met to describe technical considerations related to fan efficiency with DOE. The meeting participants described how fan efficiency varies with flow and pressure and reiterated support for an approach that takes into account these considerations. The meeting participants explained the

  20. Recently Andrew Sutton and Mylan Sykora, Los Alamos National Laboratory scientists in

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Moving an Idea to the Marketplace August 1, 2016 Recently Andrew Sutton and Mylan Sykora, Los Alamos National Laboratory scientists in the inorganic isotope and actinide chemistry division were selected to participate in the first Innovate New Mexico Showcase. They joined scientists from Air Force Research Laboratory, New Mexico State University, New Mexico Tech and Sandia National Laboratories to present their work to investors. This showcase was not the beginning of the journey for Sutton,

  1. Genepool Quarterly Maintenance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Genepool Quarterly Maintenance Genepool Quarterly Maintenance November 7, 2012 by Kirsten Fagnan The Genepool cluster will be offline for maintenance next Tuesday, November 13th ...

  2. Claudia Andrews

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Volume One Film Collection Volume Two 75th Anniversary Hydropower in the Northwest Woody Guthrie Videos Strategic Direction Branding & Logos Power of the River History Book...

  3. Evaluation of Routine Atmospheric Sounding Measurements using...

    Office of Scientific and Technical Information (OSTI)

    using Unmanned Systems (ERASMUS) Science Plan Citation Details In-Document Search Title: Evaluation of Routine Atmospheric Sounding Measurements using Unmanned Systems ...

  4. PREVENTIVE MAINTENANCE LEADS TO EARLY DETECTION AT WIPP SITE

    Broader source: Energy.gov [DOE]

    Carlsbard, NM - The effectiveness of the Waste Isolation Pilot Plant’s (WIPP) preventive maintenance program paid huge dividends late last month when an issue with a steel rope on the project’s waste conveyance was identified during a routine inspection.

  5. Effect of Hurricane Andrew on the Turkey Point Nuclear Generating Station from August 20--30, 1992. [Final report

    SciTech Connect (OSTI)

    Hebdon, F.J.

    1993-03-01

    On August 24, 1992, Hurricane Andrew, a Category 4 hurricane, struck the Turkey Point Electrical Generating Station with sustained winds of 145 mph (233 km/h). This is the report of the team that the US Nuclear Regulatory Commission (NRC) and the Institute of Nuclear Power Operations (INPO) jointly sponsored (1) to review the damage that the hurricane caused the nuclear units and the utility`s actions to prepare for the storm and recover from it, and (2) to compile lessons that might benefit other nuclear reactor facilities.

  6. Genepool Quarterly Maintenance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Genepool Quarterly Maintenance Genepool Quarterly Maintenance November 7, 2012 by Kirsten Fagnan The Genepool cluster will be offline for maintenance next Tuesday, November 13th from 7:00 am to 7:00 pm (PST). During this time staff will upgrade the Genepool compute nodes to Debian 6. Also, the firmware for /projectb and /house will be updated. /projectb will be unavailable from 7:00 am to 7:00 pm (PST) and /house will be unavailable from 8:00 am to 1:00 pm (PST). Any webservices or workflows

  7. Routine Radiological Environmental Monitoring Plan. Volume 1

    SciTech Connect (OSTI)

    Bechtel Nevada

    1999-12-31

    The U.S. Department of Energy manages the Nevada Test Site in a manner that meets evolving DOE Missions and responds to the concerns of affected and interested individuals and agencies. This Routine Radiological Monitoring Plan addressess complicance with DOE Orders 5400.1 and 5400.5 and other drivers requiring routine effluent monitoring and environmental surveillance on the Nevada Test Site. This monitoring plan, prepared in 1998, addresses the activities conducted onsite NTS under the Final Environmental Impact Statement and Record of Decision. This radiological monitoring plan, prepared on behalf of the Nevada Test Site Landlord, brings together sitewide environmental surveillance; site-specific effluent monitoring; and operational monitoring conducted by various missions, programs, and projects on the NTS. The plan provides an approach to identifying and conducting routine radiological monitoring at the NTS, based on integrated technical, scientific, and regulatory complicance data needs.

  8. Maintenance | OpenEI Community

    Open Energy Info (EERE)

    Maintenance Home Rmckeel's picture Submitted by Rmckeel(297) Contributor 8 March, 2013 - 14:23 OpenEI maintenance March 8-9, 2013 developer Maintenance OpenEI We would like to...

  9. Surveillance & Maintenance: The Requirements Based Surveillance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Surveillance & Maintenance: The Requirements Based Surveillance and ...

  10. Annual summary report of the Decontamination and Decommissioning Surveillance and Maintenance Program at Oak Ridge National Laboratory for period ending September 30, 1994

    SciTech Connect (OSTI)

    Anderson, L.A.; Burwinkle, T.W.; Ford, M.K.; Gaddis, H.R.; Holder, L. Jr.; Mandry, G.J.; Nelson, T.R.; Patton, B.D.

    1995-03-01

    The Surplus Facilities Management Program (SFMP) was established at Oak Ridge National Laboratory (ORNL) in 1976 to provide collective management of all surplus sites under ORNL`s control on the Oak Ridge Reservation. Presently, over 50 facilities, grouped into projects, are currently managed by the Decontamination and Decommissioning Program, the successor program to the SFMP. Support includes (1) surveillance and maintenance planning; (2) routine surveillance and maintenance; and (3) special maintenance projects. This report documents routine surveillance and maintenance, special projects, and special maintenance performed on these facilities for the period of October 1993 through September 1994.

  11. Step 5: Operations and Maintenance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Process Step 5: Project Operations and Maintenance Project Development Process 1 Potential 5 Operations & Maintenance 3 Refinement 2 Options 4 Implementation 2 1/28/2016 2 Presentation Agenda * Step 5: Project Operations and Maintenance (O&M) * Post-procurement activities * Drivers * Technology examples * Activity 3 Potential Options Refinement Implementation Operations & Maintenance Step 5: Operations & Maintenance 4 Photo by Warren Getz, NREL 00180 Purpose: Conduct or ensure

  12. EA-1982: Parker-Davis Transmission System Routine Operation and...

    Broader source: Energy.gov (indexed) [DOE]

    proposed continuation of operation and maintenance activities and implementation of a ... and at substations and maintenance facilities associated with the transmission system. ...

  13. OpenEI Community - Maintenance

    Open Energy Info (EERE)

    maintenance March 8-9, 2013 http:en.openei.orgcommunityblogopenei-maintenance-march-8-9-2013

    We would like to inform the OpenEI community that OpenEI will be...

  14. Improving cogeneration plant performance through effective maintenance strategies

    SciTech Connect (OSTI)

    Sheikh, S.M.

    1998-12-31

    Gas-fired cogeneration plants supplying power and thermal energy make up an increasing percentage of new fossil generation capacity additions, both in the US and overseas. These plants are popular, not only because they cost less to build, but also because they are highly efficient and their operation and maintenance costs are lower than plants using the traditional coal-based Rankine cycle. One of the methods being used to contain the initial cost of building cogeneration plants is to minimize redundancy both in the quantity of spare equipment specified for the various systems in the plants and in the design capacity of individual components. The overall effect of such a strategy may lead to reduced reliability and availability of the cogeneration plant in the long term. Operating cogeneration plants present a variety of technologies, equipment, and operating practices. While newer cogeneration plants routinely operate at a reliability of 90% or higher, older plants may not be able to achieve such performance due to excessive equipment breakdowns or inadequate maintenance strategies. By not having the appropriate maintenance programs in place, even newer cogeneration plants are vulnerable to deteriorating reliability and availability in the long term. This paper describes mechanisms for directing maintenance resources toward reducing current maintenance costs while maintaining high availability without sacrificing long-term reliability. The maintenance strategies discussed are those that can provide the maximum benefits for improving cogeneration plant reliability, availability, capacity, cost control, and safety.

  15. Operations and Maintenance in Federal Facilities | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Maintenance in Federal Facilities Operations and Maintenance in Federal Facilities Effective operations and maintenance plans help ensure federal equipment, such as this water ...

  16. Major NERSC Maintenance Tuesday November 11

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Major NERSC Maintenance Tuesday November 11 Major NERSC Maintenance Tuesday November 11 October 31, 2014 by Francesca Verdier There will be a major NERSC maintenance on Tuesday, ...

  17. Operations and Maintenance in Federal Facilities | Department...

    Office of Environmental Management (EM)

    Operations and Maintenance in Federal Facilities Operations and Maintenance in Federal Facilities Effective operations and maintenance plans help ensure federal equipment, such as ...

  18. An automated neutron monitor maintenance system

    SciTech Connect (OSTI)

    Moore, F.S.; Griffin, J.C.; Odell, D.M.C.

    1996-09-01

    Neutron detectors are commonly used by the nuclear materials processing industry to monitor fissile materials in process vessels and tanks. The proper functioning of these neutron monitors must be periodically evaluated. We have developed and placed in routine use a PC-based multichannel analyzer (MCA) system for on-line BF3 and He-3 gas-filled detector function testing. The automated system: 1) acquires spectral data from the monitor system, 2) analyzes the spectrum to determine the detector`s functionality, 3) makes suggestions for maintenance or repair, as required, and 4) saves the spectrum and results to disk for review. The operator interface has been designed to be user-friendly and to minimize the training requirements of the user. The system may also be easily customized for various applications

  19. Hanford.gov Site Maintenance - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford.gov Site Maintenance Hanford.gov Site Maintenance Hanford.gov Site Maintenance Hanford.gov Site Maintenance Email Email Page | Print Print Page | Text Increase Font Size ...

  20. Addressing Deferred Maintenance, Infrastructure Costs, and Excess...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Addressing Deferred Maintenance, Infrastructure Costs, and Excess Facilities at Portsmouth and Paducah Addressing Deferred Maintenance, Infrastructure Costs, and Excess Facilities ...

  1. Risk-based maintenance modeling. Prioritization of maintenance importances and quantification of maintenance effectiveness

    SciTech Connect (OSTI)

    Vesely, W.E.; Rezos, J.T.

    1995-09-01

    This report describes methods for prioritizing the risk importances of maintenances using a Probabilistic Risk Assessment (PRA). Approaches then are described for quantifying their reliability and risk effects. Two different PRA importance measures, minimal cutset importances and risk reduction importances, were used to prioritize maintenances; the findings show that both give similar results if appropriate criteria are used. The justifications for the particular importance measures also are developed. The methods developed to quantify the reliability and risk effects of maintenance actions are extensions of the usual reliability models now used in PRAs. These extended models consider degraded states of the component, and quantify the benefits of maintenance in correcting degradations and preventing failures. The negative effects of maintenance, including downtimes, also are included. These models are specific types of Markov models. The data for these models can be obtained from plant maintenance logs and from the Nuclear Plant Reliability Data System (NPRDS). To explore the potential usefulness of these models, the authors analyzed a range of postulated values of input data. These models were used to examine maintenance effects on a components reliability and performance for various maintenance programs and component data. Maintenance schedules were analyzed to optimize the component`s availability. In specific cases, the effects of maintenance were found to be large.

  2. Upcoming BPAT Systems Maintenance Events

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Upcoming-BPAT-Systems-Maintenance-Events Sign In About | Careers | Contact | Investors | bpa.gov Search Doing Business Expand Doing Business Customer Involvement Expand Customer...

  3. Tim Kuneli, Electronics Maintenance Group

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tim Kuneli, Electronics Maintenance Group Print The recent ALS power supply failure was one of the most challenging projects that Electronics Engineer Technical Superintendent Tim...

  4. Test Site Operations & Maintenance Safety

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Test Site Operations & Maintenance Safety - Sandia Energy Energy Search Icon Sandia Home ... Applications National Solar Thermal Test Facility Nuclear Energy Systems ...

  5. ANDREW W. TUNNELL

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Southern Company Services, Inc. ("SCS"), as agent for Alabama Power Company, Georgia Power ... requirements under Section 216 of the Federal Power Act ("FPA"), 16 U.S.C. 824p. ...

  6. ANDREW W. TUNNELL

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of three nuclear generating plants - Southern Nuclear - and a provider of fiber optics and wireless communications - Southern Telecom and SouthernLINC Wireless, respectively. ...

  7. Women @ Energy: Joy Andrews

    Broader source: Energy.gov [DOE]

    "Don’t be intimidated by things that are difficult. For me science and math didn't always come easily, but when I kept trying and practicing I eventually got it in a way that was satisfying. I still need this type of determination because for the research we do, knowledge and techniques are changing rapidly, and I am always learning new things." Read more from Joy on her profile here.

  8. Mr. Andrew Wallo, III

    Office of Legacy Management (LM)

    or sources of elevated concentrations of thorium and radium discovered on properties in ... property, now known as Plant 4, to cast aircraft parts made of magnesium-thorium alloy. ...

  9. Dr. Andrew Russo

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Disabling a Killer Virus The CAMD Protein Crystallography beamline was used to determine the structure of a protein that the Venezuelan Equine Encephalitis (VEE) virus requires for...

  10. George Andrew Olah - Patents

    Office of Scientific and Technical Information (OSTI)

    materials by treating the same with a superacidic catalyst system consisting of anhydrous hydrogen fluoride and boron trifluoride in the presence of super-atmospheric hydrogen. ...

  11. Maintenance Practices for LED Streetlights

    Office of Energy Efficiency and Renewable Energy (EERE)

    This April 14, 2014 webinar answered important questions about the maintenance and reliability of LED streetlights, and how to take these issues into account when planning and preparing for a...

  12. Efficiency Lighting & Maintenance Inc | Open Energy Information

    Open Energy Info (EERE)

    & Maintenance Inc Jump to: navigation, search Name: Efficiency Lighting & Maintenance Inc Address: 5a Del Mar Drive Place: Brookfield, Connecticut Zip: 06804 Region: Northeast - NY...

  13. Geothermal Data Development, Collection, and Maintenance | Open...

    Open Energy Info (EERE)

    Data Development, Collection, and Maintenance Jump to: navigation, search Geothermal ARRA Funded Projects for Geothermal Data Development, Collection, and Maintenance Loading...

  14. Maintenance Planner | Princeton Plasma Physics Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Maintenance Planner Department: Facilities Requisition Number: 1501075 Position Summary: This multi-trade Maintenance Planner position will enhance the Lab's Facilities Division...

  15. Oregon Department of Transportation - Maintenance and Operations...

    Open Energy Info (EERE)

    Maintenance and Operations Branch Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Oregon Department of Transportation - Maintenance and Operations...

  16. Optimizing Installation, Operation, and Maintenance at Offshore...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in the United States Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in...

  17. Optimizing Installation, Operation, and Maintenance at Offshore...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in the United States Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in ...

  18. Spring Home Maintenance: Windows, Windows, Windows! | Department...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Spring Home Maintenance: Windows, Windows, Windows Spring Home Maintenance: Windows, Windows, Windows April 26, 2013 - 11:42am Addthis Caulking is an easy way to reduce air ...

  19. Requirements Based Surveillance and Maintenance Review Process...

    Energy Savers [EERE]

    Based Surveillance and Maintenance Review Process Interview Form Requirements Based Surveillance and Maintenance Review Process Interview Form Requirements Based Surveillance and ...

  20. FAQS Reference Guide - Facility Maintenance Management | Department...

    Broader source: Energy.gov (indexed) [DOE]

    are developed to assist operators, maintenance personnel, and the technical staff in ... (STD)-1181-2014, Facility Maintenance Management Functional Area Qualification Standard. ...

  1. Preventive Maintenance Strategies for Compressed Air Systems...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Suggested Actions * Establish a regular, well-organized maintenance program in accordance ... that all compressed air system maintenance needs are performed properly, on ...

  2. Web Maintenance Requirements | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Read more about EERE's expectations for website maintenance. Maintenance Schedule All Web ... Learn more about content analysis. Attend semi-annual Web Governance Team meetings. Twice ...

  3. Maintenance implementation plan for the Fast Flux Test Facility

    SciTech Connect (OSTI)

    Boyd, J.A.

    1997-01-30

    This plan implements the U.S. Department of Energy (DOE) 4330.4B, Maintenance Management Program (1994), at the Fast Flux Test Facility (FFTF). The FFTF is a research and test reactor located near Richland, Washington, and is operated under contract for the DOE by the B&W Hanford Company (BWHC). The intent of this Maintenance Implementation Plan (MIP) is to describe the manner in which the activities of the maintenance function are executed and controlled at the FFTF and how this compares to the requirements of DOE 4330.4B. The MIP ii a living document that is updated through a Facility Maintenance Self- Assessment Program. During the continuing self-assessment program, any discrepancies found are resolved to meet DOE 4330.4B requirements and existing practices. The philosophy of maintenance management at the FFTF is also describe within this MIP. This MIP has been developed based on information obtained from various sources including the following: * A continuing self-assessment against the requirements of the Conduct of Maintenance Order * In-depth reviews conducted by the members of the task team that assembled this MIP * Inputs from routine audits and appraisals conducted at the facility The information from these sources is used to identify those areas in which improvements could be made in the manner in which the facility conducts maintenance activities. The action items identified in Rev. 1 of the MIP have been completed. The MIP is arranged in six sections. Section I is this Executive Summary. Section 2 describes the facility and its 0683 history. Section 3 describes the philosophy of the graded approach and how it is applied at FFTF. Section 3 also discusses the strategy and the basis for the prioritizing resources. Section 4 contains the detailed discussion of `the elements of DOE 4330.4B and their state of implementation. Section 5 is for waivers and requested deviations from the requirements of the order. Section 6 contains a copy of the Maintenance

  4. ARM - Field Campaign - Evaluation of Routine Atmospheric Sounding

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Measurements using Unmanned Systems (ERASMUS) govCampaignsEvaluation of Routine Atmospheric Sounding Measurements using Unmanned Systems (ERASMUS) Campaign Links Science Plan ERASMUS Backgrounder News & Press Images Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send Campaign : Evaluation of Routine Atmospheric Sounding Measurements using Unmanned Systems (ERASMUS) 2015.08.02 - 2016.10.31 Lead Scientist : Gijs de Boer For data sets, see

  5. Evaluation of Routine Atmospheric Sounding Measurements using Unmanned

    Office of Scientific and Technical Information (OSTI)

    Systems (ERASMUS) Science Plan (Program Document) | SciTech Connect Evaluation of Routine Atmospheric Sounding Measurements using Unmanned Systems (ERASMUS) Science Plan Citation Details In-Document Search Title: Evaluation of Routine Atmospheric Sounding Measurements using Unmanned Systems (ERASMUS) Science Plan The use of unmanned aerial systems (UAS) is becoming increasingly popular for a variety of applications. One way in which these systems can provide revolutionary scientific

  6. Operations & Maintenance Best Practices Guide: Chapter 3

    Broader source: Energy.gov [DOE]

    Guide describes chapter 3 of the Operations & Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  7. Iron production maintenance effectiveness system

    SciTech Connect (OSTI)

    Augstman, J.J.

    1996-12-31

    In 1989, an internal study in the Coke and Iron Maintenance Department identified the opportunities available to increase production, by decreasing unscheduled maintenance delays from 4.6%. A five year front loaded plan was developed, and presented to the company president. The plan required an initial investment of $1.4 million and a conservative break-even point was calculated to be 2.5 years. Due to budget restraints, it would have to be self-funded, i.e., generate additional production or savings, to pay for the program. The program began in 1991 at number 2 coke plant and the blast furnaces. This paper will describe the Iron Production Maintenance Effectiveness System (ME), which began with the mechanical and pipefitting trades.

  8. Thermography instruments for predictive maintenance

    SciTech Connect (OSTI)

    Palko, E.

    1993-08-12

    Thermography (infrared imaging, or IR scanning) is not only the most versatile predictive maintenance technology available today; it is, in general, the most cost-effective. Plant engineering can apply a virtually unlimited variety of predictive maintenance instruments, but all are restricted regarding the types of existing and incipient problems they can detect. Inplant applications of thermography, however, are truly limited only by the extent of the plant engineer's imagination. Here are ways that thermography can be used to fight downtime in plants, and factors to consider when selecting the best instrument for particular circumstances.

  9. Operations and Maintenance Manual for Large Aperture Scanner System

    SciTech Connect (OSTI)

    Jones, Anthony M.; Hall, Thomas E.

    2010-04-08

    Operations and maintenance manual includes detailed instructions for system assembly, use, and maintenance.

  10. Emergency diesel generator: Maintenance and failure unavailability, and their risk impacts

    SciTech Connect (OSTI)

    Samanta, P.; Kim, I.; Uryasev, S.; Penoyar, J.; Vesely, W.

    1994-11-01

    Emergency Diesel Generators (EDGs) provide on-site emergency alternating current (ac) electric power for a nuclear plant in the event that all off-site power sources are lost. Existing regulations establish requirements for designing and testing of these on-site power sources to reduce to an acceptable level the probability of losing all ac power sources. Operating experience with EDGs has raised questions about their testing and maintenance to achieve the EDG reliability levels and the total EDG unavailability experienced (fraction of time EDG is out-of-service due to testing, maintenance, and failures). In this report, recent operating experience is used to assess EDG unavailability due to testing, maintenance, and failures during reactor power operation and during plant shutdown. Recent data show an improvement in EDG reliability, but an increase in EDG unavailability due to maintenance, a significant portion of which is due to routinely scheduled maintenances. Probabilistic safety assessments (PSAs) of selected nuclear power plants are used to assess the risk impact of EDG unavailability due to maintenance and failure during power operation, and during different stages of plant shutdown. The results of these risk analyses suggest qualitative insights for scheduling EDG maintenance that will have minimal impact on risk of operating nuclear power plants.

  11. Enrico Fermi Awards Ceremony for Dr. Allen J. Bard and Dr. Andrew Sessler, February 2014 (Presentations, including remarks by Energy Secretary, Dr. Ernest Moniz)

    ScienceCinema (OSTI)

    Moniz, Ernest [U.S. Energy Secretary

    2014-08-22

    The Fermi Award is a Presidential award and is one of the oldest and most prestigious science and technology honors bestowed by the U.S. Government. On February 3, 2014 it was conferred upon two exceptional scientists. The first to be recognized is Dr. Allen J. Bard, 'for international leadership in electrochemical science and technology, for advances in photoelectrochemistry and photocatalytic materials, processes, and devices, and for discovery and development of electrochemical methods including electrogenerated chemiluminescence and scanning electrochemical microscopy.' The other honoree is Dr. Andrew Sessler, 'for advancing accelerators as powerful tools of scientific discovery, for visionary direction of the research enterprise focused on challenges in energy and the environment, and for championing outreach and freedom of scientific inquiry worldwide.' Dr. Patricia Dehmer opened the ceremony, and Dr. Ernest Moniz presented the awards.

  12. Enrico Fermi Awards Ceremony for Dr. Allen J. Bard and Dr. Andrew Sessler, February 2014 (Presentations, including remarks by Energy Secretary, Dr. Ernest Moniz)

    SciTech Connect (OSTI)

    Moniz, Ernest

    2014-02-03

    The Fermi Award is a Presidential award and is one of the oldest and most prestigious science and technology honors bestowed by the U.S. Government. On February 3, 2014 it was conferred upon two exceptional scientists. The first to be recognized is Dr. Allen J. Bard, 'for international leadership in electrochemical science and technology, for advances in photoelectrochemistry and photocatalytic materials, processes, and devices, and for discovery and development of electrochemical methods including electrogenerated chemiluminescence and scanning electrochemical microscopy.' The other honoree is Dr. Andrew Sessler, 'for advancing accelerators as powerful tools of scientific discovery, for visionary direction of the research enterprise focused on challenges in energy and the environment, and for championing outreach and freedom of scientific inquiry worldwide.' Dr. Patricia Dehmer opened the ceremony, and Dr. Ernest Moniz presented the awards.

  13. Maintenance neutron coincidence counter manual

    SciTech Connect (OSTI)

    Krick, M.S.; Polk, P.J.; Atencio, J.D.

    1989-09-01

    A compact thermal-neutron coincidence counter has been constructed specifically for use by the International Atomic Energy Agency as a reference neutron detector for maintenance activities. The counter is designed for use only with {sup 252}Cf sources in SR-CF-100 capsules. This manual describes the detector's mechanical and electrical components and its operating characteristics. 2 refs., 8 figs.

  14. Drive alignment pays maintenance dividends

    SciTech Connect (OSTI)

    Fedder, R.

    2008-12-15

    Proper alignment of the motor and gear drive on conveying and processing equipment will result in longer bearing and coupling life, along with lower maintenance costs. Selecting an alignment free drive package instead of a traditional foot mounted drive and motor is a major advancement toward these goals. 4 photos.

  15. EZVIDEO, FORTRAN graphics routines for the IBM AT

    SciTech Connect (OSTI)

    Patterson, M.R.; Holdeman, J.T.; Ward, R.C.; Jackson, W.L.

    1989-10-01

    A set of IBM PC-based FORTRAN plotting routines called EZVIDEO is described in this report. These routines are written in FORTRAN and can be called from FORTRAN programs. EZVIDEO simulates a subset of the well-known DISSPLA graphics calls and makes plots directly on the IBM AT display screen. Screen dumps can also be made to an attached LaserJet or Epson printer to make hard copy without using terminal emulators. More than forty DISSPLA calls are simulated by the EZVIDEO routines. Typical screen plots require about 10 seconds (s), and good hard copy of the screen image on a laser printer requires less than 2 minutes (min). This higher-resolution hard copy is adequate for most purposes because of the enhanced resolution of the screen in the EGA and VGA modes. These EZVIDEO routines give the IB, AT user a stand-alone capability to make useful scientific or engineering plots directly on the AT, using data generated in FORTRAN programs. The routines will also work on the IBM PC or XT in CGA mode, but they require more time and yield less resolution. 7 refs., 4 figs.

  16. Operations and Maintenance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Soft Costs Operations and Maintenance Operations and Maintenance Photo of a man, wearing a yellow hard hat, looking at a wall with panels and wires mounted to it. Lower ...

  17. U.S. Department of Energy Categorical Exclusion Determination Form

    Office of Environmental Management (EM)

    Replacement of A-Area Critical Fire Hydrants 3001, 3013, 3018, & 3032. Savannah River Site Aiken/Aiken/South Carolina The attached scope of work describes the installation of a new 6" resilient seat curb box gate valves and the replacement of existing fire hydrants connected to the outside underground (OSUG) fire water system in the A-Area. B1.3 - Routine maintenance Andrew R. Grainger Digitally signed by Andrew R. Grainger DN: cn=Andrew R. Grainger, o=DOE-SR, ou=EQMD,

  18. CRAD, Maintenance Assessment Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Maintenance Assessment Plan CRAD, Maintenance Assessment Plan Performance Objective: An effective facilities maintenance program should optimize the material condition of components and equipment to support safe and effective operations and ensure the peak performance and reliability of those systems and equipment important to operations. Criteria: The program, facility or operation has a Maintenance Implementation Plan (MIP), or equivalent document, which defines and documents the approach to

  19. Operations & Maintenance Best Practices Guide: Chapter 9

    Broader source: Energy.gov [DOE]

    Guide describes chapter 9 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  20. Africa's Transport Infrastructure Mainstreaming Maintenance and...

    Open Energy Info (EERE)

    Transport Infrastructure Mainstreaming Maintenance and Management Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Africa's Transport Infrastructure Mainstreaming...

  1. Reliability centered maintenance (RCM) products - future

    SciTech Connect (OSTI)

    Lyons, P.F.

    1996-08-01

    This paper summarizes products related to RCM of power systems which will soon be available. The titles include: substation RCM handbook and software; substation RCM driven productive maintenance; transmission RCM evaluation; transmission inspection and maintenance workstation; transmission inspection and detection methods; substation RCM implementation and software support; substation maintenance management workstation; transmission RCM handbook and software; transmission inspection and maintenance workstation - TC; distribution RCM handbook and software; transmission RCM implementation and software support; and distribution RCM implementation and software support.

  2. Operations & Maintenance Best Practices Guide: Chapter 6

    Broader source: Energy.gov [DOE]

    Guide describes chapter 6 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  3. Operations & Maintenance Best Practices Guide: Appendix a

    Broader source: Energy.gov [DOE]

    Guide describes Appendix A of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  4. Operations & Maintenance Best Practices Guide: Front Matter

    Broader source: Energy.gov [DOE]

    Guide describes the front matter of the Operations and Maintenance Best Practices: a Guide to Achieving Operational Efficiency.

  5. Operations & Maintenance Best Practices Guide: Appendix d

    Broader source: Energy.gov [DOE]

    Guide describes Appendix D of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  6. Operations & Maintenance Best Practices Guide: Chapter 2

    Broader source: Energy.gov [DOE]

    Guide describes chapter 2 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  7. Operations & Maintenance Best Practices Guide: Chapter 1

    Broader source: Energy.gov [DOE]

    Guide describes chapter 1 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  8. Operations & Maintenance Best Practices Guide: Chapter 5

    Broader source: Energy.gov [DOE]

    Guide describes chapter 5 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  9. Operations & Maintenance Best Practices Guide: Chapter 8

    Broader source: Energy.gov [DOE]

    Guide describes chapter 8 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  10. Operations & Maintenance Best Practices Guide: Chapter 7

    Broader source: Energy.gov [DOE]

    Guide describes chapter 7 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  11. Operations & Maintenance Best Practices Guide: Chapter 10

    Broader source: Energy.gov [DOE]

    Guide describes chapter 10 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  12. Operations & Maintenance Best Practices Guide: Appendix c

    Broader source: Energy.gov [DOE]

    Guide describes Appendix C of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  13. Operations & Maintenance Best Practices Guide: Appendix B

    Broader source: Energy.gov [DOE]

    Guide describes Appendix B of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  14. Operations & Maintenance Best Practices Guide: Chapter 11

    Broader source: Energy.gov [DOE]

    Guide describes chapter 11 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  15. Solar Water Heating System Maintenance and Repair | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Water Heating System Maintenance and Repair Solar Water Heating System Maintenance and Repair Rooftop solar water heaters need regular maintenance to operate at peak efficiency. |...

  16. SURVEILLANCE AND MAINTENANCE RBSM The Requirements Based Surveillance

    Office of Environmental Management (EM)

    SURVEILLANCE AND MAINTENANCE RBSM The Requirements Based Surveillance and Maintenance Review Process Surveillance and Maintenance Overview What is RBSM and why do I need this ...

  17. Solar Water Heating System Maintenance and Repair | Department...

    Energy Savers [EERE]

    Water Heating System Maintenance and Repair Solar Water Heating System Maintenance and Repair Rooftop solar water heaters need regular maintenance to operate at peak efficiency. | ...

  18. Standard hydrogen monitoring system - E operation and maintenance manual

    SciTech Connect (OSTI)

    Schneider, T.C.

    1997-06-01

    The purpose of this document is to provide information for the operation and maintenance of the Standard Hydrogen Monitoring System- E (SHMS-E) used in the 200E and 20OW area tank farms on the Hanford Site. This provides information specific to the mechanical operation of the system and is not intended to take the place of a Plant Operating Procedure. However, it does provide more information on the system than a Plant Operating Procedure. The intent here is that the system is started up by a technician or engineer who has completed tank farms training course for SHMS, and then the only actions performed by Operations will be routine log taking. If any problems not addressed by the operating procedure are encountered with the unit, engineering should be contacted.

  19. Cryogenic Neutron Protein Crystallography: routine methods and potential benefits

    SciTech Connect (OSTI)

    Weiss, Kevin L; Tomanicek, Stephen J; NG, Joseph D

    2014-01-01

    The use of cryocooling in neutron diffraction has been hampered by several technical challenges such as the need for specialized equipment and techniques. Recently we have developed and deployed equipment and strategies that allow for routine neutron data collection on cryocooled crystals using off the shelf components. This system has several advantages, compared to a closed displex cooling system such as fast cooling coupled with easier crystal mounting and centering. The ability to routinely collect cryogenic neutron data for analysis will significantly broaden the range of scientific questions that can be examined by neutron protein crystallography. Cryogenic neutron data collection for macromolecules has recently become available at the new Biological Diffractometer BIODIFF at FRM II and the Macromolecular Diffractometer (MaNDi) at the Spallation Neutron Source, Oak Ridge National Laboratory. To evaluate the benefits of a cryocooled neutron structure we collected a full neutron data set on the BIODIFF instrument on a Toho-1 lactamase structure at 100K.

  20. Evaluation of Routine Atmospheric Sounding Measurements Using Unmanned Systems

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Routine Atmospheric Sounding Measurements Using Unmanned Systems but also to understand the different processes involved in a cloud's life cycle by providing measurements complimentary to those concurrently obtained by instruments stationed at the third ARM Mobile Facility (AMF3) at Oliktok Point. ERASMUS will supply data to address the following science questions: * How does temperature and humidity evolve during transitions between clear and cloudy skies? * How do aerosol properties vary with

  1. No maintenance -- no energy efficiency

    SciTech Connect (OSTI)

    Szydlowski, R.F.; Schliesing, J.S.; Winiarski, D.W.

    1994-12-01

    Field investigations illustrate that it is not realistic to expect new high-tech equipment to function for a full life expectancy at high efficiency without significant operations and maintenance (O&M). A simple walk through inspection of most buildings reveals extensive equipment that is being operated on manual override, is incorrectly adjusted and operating inefficiently, or is simply inoperative. This point is illustrated with two examples at Robins Air Force Base, Georgia. The first describes development of a comprehensive, base-wide, steam trap maintenance program. The second describes a measured evaluation from a typical office building. The objective of both examples was to assess the importance of proper O&M. The proposed ``O&M First`` philosophy will result in more efficient building HVAC operation, provide improved services to the building occupants, and reduce energy consumption and unscheduled equipment repair/replacement. Implementation of a comprehensive O&M program will result in a 15--25% energy savings. The O&M foundation that is established will allow other energy conservation activities such is demand side management or energy management and control systems, to achieve and maintain their expected energy savings.

  2. Second Line of Defense: Electronic Maintenance Reports, Local Maintenance Provider User Guide, Rev. 3

    SciTech Connect (OSTI)

    Leigh, Richard J.

    2012-09-01

    The Electronic Maintenance Report forms allow Local Maintenance Providers (LMP) and other program staff to enter maintenance information into a simple and secure system. This document describes the features and information required to complete the Maintenance Report forms. It is expected that all Corrective Maintenance Reports from LMPs will be submitted electronically into the SLD Portal. As an exception (e.g., when access to the SLD Portal is unavailable), Maintenance Reports can be submitted via a secure Adobe PDF form available through the Sustainability Manager assigned to each country.

  3. CRAD, NNSA - Maintenance (MN) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NNSA - Maintenance (MN) CRAD, NNSA - Maintenance (MN) CRAD for Maintenance (MN). Criteria Review and Approach Documents (CRADs) that can be used to conduct a well-organized and thorough assessment of elements of safety and health programs. CRADs consist of a Performance Objective that identifies the expectation(s) or requirement(s) to be verified, which reflect the complete scope of the assessment; Criteria that provide specifics by which the performance objectives are measured, including

  4. Scheduled Maintenance Periods | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Scheduled Maintenance Periods The CNM holds three maintenance periods per year. During these times certain CNM facilities may not be available for user activities. The Sector 26 beamline will not be available, the High-Performance Computing Cluster and nanofabrication facilities often are not available, and other facilities may undergo maintenance for only one or two days. Please contact your CNM Scientific Contact prior to arrival and plan your work visits and schedules accordingly. To better

  5. Routine environmental audit of Ames Laboratory, Ames, Iowa

    SciTech Connect (OSTI)

    1994-09-01

    This document contains the findings identified during the routine environmental audit of Ames Laboratory, Ames, Iowa, conducted September 12--23, 1994. The audit included a review of all Ames Laboratory operations and facilities supporting DOE-sponsored activities. The audit`s objective is to advise the Secretary of Energy, through the Assistant Secretary for Environment, Safety and Health, as to the adequacy of the environmental protection programs established at Ames Laboratory to ensure the protection of the environment, and compliance with Federal, state, and DOE requirements.

  6. Supervisory Transmission Lines and Substation Maintenance Manager

    Broader source: Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Desert Southwest Region Transmission Lines and Substation Maintenance (G5200) 615...

  7. Pacific Northwest National Laboratory Grounds Maintenance

    SciTech Connect (OSTI)

    2009-08-05

    FEMP Water Efficiency Best Management Practice #4 and #5: Case study overview of the grounds maintenance program for Pacific Northwest National Laboratory.

  8. Improve Operations & Maintenance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Every building's energy consumption can benefit from rigorous operations and maintenance ... for improvement, and implement low-cost changes to reduce energy consumption. ...

  9. Surveillance & Maintenance: The Requirements Based Surveillance and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Maintenance Review Process (RBSM) | Department of Energy Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Overall direction for surveillance and maintenance of excess facilities is addressed in DOE G 430.1-2, IMPLEMENTATION GUIDE FOR SURVEILLANCE AND MAINTENANCE DURING FACILITY TRANSITION AND DISPOSITION. In addition, the change in

  10. Maintenance for the Millennium: Another Approach

    SciTech Connect (OSTI)

    Sculthorpe, Barruy R.

    2002-07-01

    Nuclear units nationwide are struggling to increase plant reliability and availability while at the same time reduce their operating and maintenance costs. Some very costly investments have been made in programs such as Reliability Centered Maintenance [RCM]. Florida Power and Light's approach at the St. Lucie Nuclear Plant has taken a slightly different approach. Building on our knowledge of the RCM process and an already existing 'World Class' Predictive Maintenance Program, a 'Condition-Based' Maintenance Program that takes advantage of the RCM philosophy and our toolbox full of advanced and highly successful predictive maintenance technologies. These tools currently consist of vibration analysis, lubricant analysis (both physical property and wear metals analysis, thermographic analysis, motor current signature analysis, tribology and process parameter trending. All employed with the intent to evaluate a machines health. This machine health check allows the forecasting of future preventative maintenance [PM's] tasks and the revision of existing PM's to maximize machine performance and eliminate 'no-value-added' maintenance activities/costs. Within the last year, the Condition-Based Maintenance Program has produced a cost saving of approximately $1.5 million dollars. As the program matures, these cost savings will accumulate well into the millennium. (authors)

  11. Proceedings: 1996 EPRI fossil plant maintenance conference

    SciTech Connect (OSTI)

    1996-07-01

    EPRI sponsors many conferences and workshops addressing various aspects of fossil power plant maintenance. Featured have been topics such as inspection methods, life assessment techniques, overhaul planning, predictive maintenance programs, thermography, vibration monitoring, welding, and component-specific events on boilers, condensers, feedwater heaters, generators, and turbines. The 1996 EPRI Fossil Plant Maintenance Conference-held July 29-August 1, 1996, in Baltimore, Maryland-reached a wider audience by providing a forum to discuss all aspects of fossil plant maintenance. Knowledgeable industry personnel exchanged information on state-of-the-art technology; identified major unresolved problems; and helped establish priorities for further research, development, and demonstration in fossil plant maintenance. This document presents report presented at the conference. Individual papers have been processed separately for the United States Department of Energy databases.

  12. Spares management for improved maintenance

    SciTech Connect (OSTI)

    Moncrief, E.C.; Schroder, R.M.

    1987-01-01

    A recent survey by the US Nuclear Regulatory Commission (NRC) of maintenance practices at US nuclear power plants confirms that spare parts availability is, to some extent, a problem at all but a few plants, and that 57% of the plants sometimes operated in a limiting condition for operation over the last year due to unavailability of spare parts. That's the bad news. The good news is that significant improvement is possible without ballooning inventory. The vast majority of total dollar value of spare parts inventory at power generation stations, whether nuclear or fossil, is rarely used (parts or components that are used 12 or less times per year including many with a history of no use for many years). Inventory Solutions of Akron, Ohio, has developed such a tool, called rarely used inventory stocking logic (RUSL) which is a user-friendly decision support tool for setting spare parts reorder points. Based on statistical computations enhanced to include the most advanced techniques developed for use in aerospace and military combat readiness, RUSL calculates the optimum stocking level to achieve the desired spare part availability at the station. In doing so, it considers the importance of the part in preventing an outage, as well as key economic ordering parameters, such as part cost, carrying cost, number of parts in service, historical observed usage, anticipated future usage, and lead time to replenish.

  13. Routine environmental audit of the Hanford Site, Richland, Washington

    SciTech Connect (OSTI)

    Not Available

    1994-05-01

    This report documents the results of the routine environmental audit of the Hanford Site (Hanford), Richland, Washington. During this audit, the activities conducted by the audit team included reviews of internal documents an reports from previous audits and assessments; interviews with US Department of Energy (DOE), State of Washington regulatory, and contractor personnel; and inspections and observations of selected facilities and operations. The onsite portion of the audit was conducted May 2--13, 1994, by the DOE Office of Environmental Audit (EH-24), located within the Office of Environment, Safety and Health (EH). The audit evaluated the status of programs to ensure compliance with Federal, State, and local environmental laws and regulations; compliance with DOE orders, guidance, and directives; and conformance with accepted industry practices and standards of performance. The audit also evaluated the status and adequacy of the management systems developed to address environmental requirements.

  14. NREL: Energy Analysis - Andrew Weekley

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2014. Variability of Photovoltaic Power in the State of Gujarat Using High Resolution Solar Data. NRELTP-7A40-60991. National Renewable Energy Laboratory (NREL), Golden, CO (US). ...

  15. Looking Glass RSL-Andrews

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Most of these exercises evaluate planning and response capabilities, and role players act out emergency situations that challenge responders to deal with problems. In the April 17 ...

  16. Major NERSC Maintenance Tuesday November 11

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Major NERSC Maintenance Tuesday November 11 Major NERSC Maintenance Tuesday November 11 October 31, 2014 by Francesca Verdier There will be a major NERSC maintenance on Tuesday, November 11, from 08:00 until 18:00 PST. Several systems and services will be unavailable during this time. Edison, Hopper, Data Transfer nodes, and Science Gateway (data portal) nodes will be unavailable 08:00 - 13:00. Carver/Dirac, PDSF, and Genepool will be unavailable 08:00 - 18:00. HPSS and web servers

  17. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-06-01

    To define the program for the management of cost-effective maintenance of Department of Energy (DOE) nuclear facilities. Guidance for compliance with this Order is contained in DOE G 433.1-1, Nuclear Facility Maintenance Management Program Guide for use with DOE O 433.1, which references Federal regulations, DOE directives, and industry best practices using a graded approach to clarify requirements and guidance for maintaining DOE-owned Government property. (Cancels DOE 4330.4B, Chapter II, Maintenance Management Program, dated 2-10-94.) Cancels DOE 4330.4B (in part). Canceled by DOE O 433.1A.

  18. Solar Water Heating System Maintenance and Repair | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Water Heating System Maintenance and Repair Solar Water Heating System Maintenance and Repair May 30, 2012 - 2:35pm Addthis Rooftop solar water heaters need regular maintenance to...

  19. Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Vehicle Maintenance to Conserve Fuel to someone by E-mail Share Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Facebook Tweet about Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Twitter Bookmark Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Google Bookmark Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Delicious Rank Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Digg Find

  20. Operations & Maintenance Best Practices Guide: Release 3.0

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Chapter 5 Types of Maintenance Programs � 5.1 Introduction What is maintenance and why is it performed? Past and current maintenance practices in both the private and government sectors would imply that maintenance is the actions associated with equipment repair after it is broken. The dictionary defines maintenance as follows: "the work of keeping something in proper condition; upkeep." This would imply that maintenance should be actions taken to prevent a device or component from

  1. BPAT Systems Maintenance - December 12, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 12122014 BPAT's e-Tag and OASIS software vendor will be performing a...

  2. BPAT Systems Maintenance - November 5, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 1152014 BPAT's e-Tag and OASIS software vendor will be performing a...

  3. BPAT Systems Maintenance - February 9, 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 292015 BPAT's e-Tag and OASIS software vendor will be performing a...

  4. BPAT Systems Maintenance - March 6, 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 362015 BPAT's e-Tag and OASIS software vendor will be performing a...

  5. Sound maintenance practices protect fan investments

    SciTech Connect (OSTI)

    Bauer, M.

    2009-11-15

    Since underground coal miners depend on axial fans, lack of maintenance could prove costly. A number of pre-emptive actions that can help keep fans running at optimal performance can also be taken. 2 photos.

  6. An improved system for routine performance testing in fossil plants

    SciTech Connect (OSTI)

    Wolff, P.J.; Hansen, D.B.; March, P.A.

    1996-05-01

    A data acquisition and analysis system has been developed that reduces the time and labor required to perform routine performance tests on power plant components. The system uses modem data acquisition and computation technologies to integrate the process of data acquisition, data analysis, and reporting of results. During a test run, the data acquisition system reads the data and transfers it to a Microsoft Excel workbook via a dynamic data exchange (DDE) link. In Excel, the system computes and displays real-time trend plots. Real-time plots typically include a display of precision errors, thus providing an immediate indication of the quality of the current test. Upon completion of a run, the system saves results and creates plots in a workbook dedicated to test results. The plots can display computed values such as turbine or boiler feedpump efficiency. Benchmark data can also be included in the plots to provide immediate feedback concerning the change in the performance of a component and the dollar cost due to the performance change. The data tables and plots provide a preliminary report that is available immediately upon completion of the test.

  7. FEMP Offers New Training on Photovoltaic Operations and Maintenance...

    Energy Savers [EERE]

    Training on Photovoltaic Operations and Maintenance Best Practices FEMP Offers New Training on Photovoltaic Operations and Maintenance Best Practices November 4, 2014 - 2:40pm ...

  8. GIZ Sourcebook Module 4b: Inspection and Maintenance and Roadworthines...

    Open Energy Info (EERE)

    b: Inspection and Maintenance and Roadworthiness Jump to: navigation, search Tool Summary LAUNCH TOOL Name: GIZ Sourcebook Module 4b: Inspection and Maintenance and Roadworthiness...

  9. Maintenance accountability, jobs, and inventory control (MAJIC) program

    SciTech Connect (OSTI)

    Adkisson, B P

    1990-01-01

    This document describes the operating procedures for the maintenance accountability, jobs, and inventory control (MAJIC) program for the Maintenance Management Department of the ORNL Instrumentation and Controls Division.

  10. Advanced Remote Maintenance Design for Pilot-Scale Centrifugal...

    Office of Scientific and Technical Information (OSTI)

    Journal Article: Advanced Remote Maintenance Design for Pilot-Scale Centrifugal Contactors Citation Details In-Document Search Title: Advanced Remote Maintenance Design for ...

  11. EIS-0442: Reauthorization of Permits, Maintenance, and Vegetation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    42: Reauthorization of Permits, Maintenance, and Vegetation Management on Western Area ... EIS-0442: Reauthorization of Permits, Maintenance, and Vegetation Management on Western ...

  12. FY 2014 Real Property Data Related to Operations and Maintenance...

    Energy Savers [EERE]

    Real Property Data Related to Operations and Maintenance Guidance FY 2014 Real Property Data Related to Operations and Maintenance Guidance FY2014DataRelatedtoOperationsandM...

  13. Long-Term Surveillance and Maintenance Requirements for Remediated...

    Energy Savers [EERE]

    Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites Long-Term ...

  14. Subject: Ames Blue Alert - X-ray Shutter Maintenance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ames Blue Alert - X-ray Shutter Maintenance Statement: This lesson learned involves an ... 4. Follow the manufacturers suggested maintenance schedule. 5. Follow the standard ...

  15. Site Transition Framework for Long-Term Surveillance and Maintenance...

    Broader source: Energy.gov (indexed) [DOE]

    for Long-Term Surveillance and Maintenance Site Transition Framework for Long-Term Surveillance and Maintenance (943.69 KB) More Documents & Publications Site Transition Framework ...

  16. Requirements-Based Surveillance and Maintenance Review Guide...

    Office of Environmental Management (EM)

    Requirements-Based Surveillance and Maintenance Review Guide Requirements-Based Surveillance and Maintenance Review Guide Use of the Guidance Manual This manual was developed to ...

  17. ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS...

    Energy Savers [EERE]

    1: SPACE AND MAINTENANCE RECORDS ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS This schedule provides for the disposal of all copies, wherever located in the ...

  18. FY 2013 Real Property Deferred, Actual, and Required Maintenance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2013 DARM ...

  19. Hopper scheduled maintenance tomorrow (Sept 19) and /project...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    scheduled maintenance tomorrow (Sept 19) and project outage Hopper scheduled maintenance tomorrow (Sept 19) and project outage September 18, 2012 by Helen He There will be a ...

  20. ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS...

    Broader source: Energy.gov (indexed) [DOE]

    of records relating to space and maintenance, except as indicated below. ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS (10.49 KB) More Documents & ...

  1. Maintenance & Cleaning Firm Earns Jefferson Lab's Small Business...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Maintenance & Cleaning Firm Earns Jefferson Lab's Small Business Award for 2013 Maintenance & Cleaning Firm Earns Jefferson Lab's Small Business Award for 2013 Prestige award ...

  2. Decision Support for Operations and Maintenance (DSOM) - Energy...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Decision Support for Operations and Maintenance (DSOM) Pacific Northwest National ... The Decision Support for Operations and Maintenance (DSOM) system is an expert ...

  3. Site Transition Framework for Long-Term Surveillance and Maintenance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Framework for Long-Term Surveillance and Maintenance Site Transition Framework for Long-Term Surveillance and Maintenance The Site Transition Framework (STF) provides a framework ...

  4. Planning and Reporting for Operations and Maintenance in Federal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Planning and Reporting for Operations and Maintenance in Federal Energy Savings Performance Contracts Planning and Reporting for Operations and Maintenance in Federal Energy ...

  5. How to Determine and Verify Operating and Maintenance Savings...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Determine and Verify Operating and Maintenance Savings in Federal Energy Savings Performance Contracts How to Determine and Verify Operating and Maintenance Savings in Federal ...

  6. FY 2012 Real Property Deferred, Actual, and Required Maintenance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2012 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2012 DARM ...

  7. Enterprise Assessments Assessment of Conduct of Maintenance at...

    Energy Savers [EERE]

    Conduct of Maintenance at the Waste Isolation Pilot Plant - June 2016 Enterprise Assessments Assessment of Conduct of Maintenance at the Waste Isolation Pilot Plant - June 2016 ...

  8. Innovative Application of Maintenance-Free Phase-Change Thermal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Application of Maintenance-Free Phase-Change Thermal Energy Storage for Dish Engine Solar Power Generation Innovative Application of Maintenance-Free Phase-Change Thermal Energy ...

  9. Enterprise Assessments Assessment of Conduct of Maintenance at...

    Office of Environmental Management (EM)

    Assessment of Conduct of Maintenance at the Waste Isolation Pilot Plant June 2016 Office ... Nuclear Safety Organization NWP Nuclear Waste Partnership, LLC NMMP Nuclear Maintenance ...

  10. Operations & Maintenance Best Practices Guide: Chapter 4 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Operations & Maintenance Best Practices Guide: Chapter 4 Guide to chapter 4 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency. Chapter...

  11. Substations reliability-centered maintenance and predictive maintenance - a strategic partnership

    SciTech Connect (OSTI)

    Colsher, R.J.; Abbott, P.D.; Matusheski, R.L.; Smith, S.B.

    1996-08-01

    A maintenance optimization study for substation components can be most effective when Reliability Centered Maintenance (RCM) Analysis is combined with a Predictive Maintenance (PDM) Assessment. If the two processes are performed concurrently, the benefit-to-cost ratios for each is increased. Also, the cost of implementing RCM recommendations for condition monitoring can be minimized, while maximizing their impact at the same time. This paper presents the essential elements of both the RCM and PDM processes, and describes how they work together in a substation environment as a comprehensive maintenance assessment tool. Descriptions of recent experiences are also included.

  12. Online Monitoring to Enable Improved Diagnostics, Prognostics and Maintenance

    SciTech Connect (OSTI)

    Bond, Leonard J.

    2011-02-01

    etc.) can be well managed, routinely diagnosed, analyzed and upgraded as needed using a combination of periodic and online CBM. The ability to successfully manage passive systems and structures is seen as the key to LTO, particularly in the USA. New approaches will be demonstrated, including prognostics for passive structures, which is critical to maintaining safety and availability and to reducing operations and maintenance costs for NPP's. To provide proactive on-line monitoring that includes estimates for RUL new projects will include advanced sensors, better understanding of stressors and challenges faced in quantification of uncertainty associated with RUL. This program area will leverage insights from past experience in other industries and seek to demonstrate the feasibility of on-line monitoring and prognostics to support NPP LTO.

  13. Performance-based inspection and maintenance strategies

    SciTech Connect (OSTI)

    Vesely, W.E.

    1995-04-01

    Performance-based inspection and maintenance strategies utilize measures of equipment performance to help guide inspection and maintenance activities. A relevant measure of performance for safety system components is component unavailability. The component unavailability can also be input into a plant risk model such as a Probabilistic Risk Assessment (PRA) to determine the associated plant risk performance. Based on the present and projected unavailability performance, or the present and projected risk performance, the effectiveness of current maintenance activities can be evaluated and this information can be used to plan future maintenance activities. A significant amount of information other than downtimes or failure times is collected or can be collected when an inspection or maintenance is conducted which can be used to estimate the component unavailability. This information generally involves observations on the condition or state of the component or component piecepart. The information can be detailed such as the amount of corrosion buildup or can be general such as the general state of the component described as {open_quotes}high degradation{close_quotes}, {open_quotes}moderate degradation{close_quotes}, or {open_quotes}low degradation{close_quotes}. Much of the information collected in maintenance logs is qualitative and fuzzy. As part of an NRC Research program on performance-based engineering modeling, approaches have been developed to apply Fuzzy Set Theory to information collected on the state of the component to determine the implied component or component piecepart unavailability. Demonstrations of the applications of Fuzzy Set Theory are presented utilizing information from plant maintenance logs. The demonstrations show the power of Fuzzy Set Theory in translating engineering information to reliability and risk implications.

  14. FY 2012 Real Property Deferred, Actual, and Required Maintenance Reporting

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Requirement | Department of Energy Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2012 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2012 DARM Transmittal Letter and Attachment Final.pdf (406.93 KB) More Documents & Publications FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement Real Property Maintenance Reporting Requirement Memorandum (July 13, 2010)

  15. Requirements Based Surveillance and Maintenance Review Process Interview

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Form | Department of Energy Based Surveillance and Maintenance Review Process Interview Form Requirements Based Surveillance and Maintenance Review Process Interview Form Requirements Based Surveillance and Maintenance Review Process Interview Form (313.11 KB) More Documents & Publications Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Guidance to Completing the Self-Directed RBSM Interview Form CX-000473: Categorical Exclusion

  16. Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Facility Ryder Opens Natural Gas Vehicle Maintenance Facility to someone by E-mail Share Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on Facebook Tweet about Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on Twitter Bookmark Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on Google Bookmark Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on

  17. Director of Maintenance for USA Jet Airlines, Inc. | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration | (NNSA) Director of Maintenance for USA Jet Airlines, Inc. Rick A. Wilson Rick Wilson July 2009 U.S. General Services Administration (GSA) Aviation Maintenance Professional of the Year Rick A. Wilson has received the U.S. General Services Administration (GSA) Aviation Maintenance Professional of the Year award. Wilson is the director of maintenance for USA Jet Airlines, Inc., in Albuquerque. He manages the maintenance activity of seven different fleet aircraft for

  18. Accelerated learning approaches for maintenance training

    SciTech Connect (OSTI)

    Erickson, E.J.

    1991-01-01

    As a training tool, Accelerated Learning techniques have been in use since 1956. Trainers from a variety of applications and disciplines have found success in using Accelerated Learning approaches, such as training aids, positive affirmations, memory aids, room arrangement, color patterns, and music. Some have thought that maintenance training and Accelerated Learning have nothing in common. Recent training applications by industry and education of Accelerated Learning are proving very successful by several standards. This paper cites available resource examples and challenges maintenance trainers to adopt new ideas and concepts to accelerate learning in all training setting. 7 refs.

  19. Pacific Northwest Laboratory FY 1993 Site Maintenance Plan for maintenance of DOE nonnuclear facilities

    SciTech Connect (OSTI)

    Bright, J.D.

    1992-09-28

    This Site Maintenance Plan has been developed for Pacific Northwest Laboratory's (PNL) Nonnuclear Facilities. It is based on requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter I, Change No. 4. The objective of this maintenance plan is to provide baseline information for compliance to the DOE Order 4330.4A, to identify needed improvements, and to document the planned maintenance budget for Fiscal Year (FY) 1993 and to estimate maintenance budgets for FY 1994 and FY 1995 for all PNL facilities. Using the results of the self-assessment, PNL has selected 12 of the 36 elements of the Maintenance Program defined by DOE Order 4330.4A, Chapter I, for improvement. The elements selected for improvement are: Facility Condition Inspections; Work Request (Order) System; Formal Job Planning and Estimating; Work Performance (Time) Standards; Priority System; Maintenance Procedures and Other Work-Related Documents; Scheduling System; Post Maintenance Testing; Backlog Work Control; Equipment Repair History and Vendor Information; Work Sampling; and Identification and Control. Based upon a graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

  20. Pacific Northwest Laboratory FY 1993 Site Maintenance Plan for maintenance of DOE nonnuclear facilities

    SciTech Connect (OSTI)

    Bright, J.D.

    1992-09-28

    This Site Maintenance Plan has been developed for Pacific Northwest Laboratory`s (PNL) Nonnuclear Facilities. It is based on requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter I, Change No. 4. The objective of this maintenance plan is to provide baseline information for compliance to the DOE Order 4330.4A, to identify needed improvements, and to document the planned maintenance budget for Fiscal Year (FY) 1993 and to estimate maintenance budgets for FY 1994 and FY 1995 for all PNL facilities. Using the results of the self-assessment, PNL has selected 12 of the 36 elements of the Maintenance Program defined by DOE Order 4330.4A, Chapter I, for improvement. The elements selected for improvement are: Facility Condition Inspections; Work Request (Order) System; Formal Job Planning and Estimating; Work Performance (Time) Standards; Priority System; Maintenance Procedures and Other Work-Related Documents; Scheduling System; Post Maintenance Testing; Backlog Work Control; Equipment Repair History and Vendor Information; Work Sampling; and Identification and Control. Based upon a graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

  1. ICD Complex Operations and Maintenance Plan

    SciTech Connect (OSTI)

    Gibson, P. L.

    2007-06-25

    This Operations and Maintenance (O&M) Plan describes how the Idaho National Laboratory (INL) conducts operations, winterization, and startup of the Idaho CERCLA Disposal Facility (ICDF) Complex. The ICDF Complex is the centralized INL facility responsible for the receipt, storage, treatment (as necessary), and disposal of INL Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) remediation waste.

  2. Reliability centered maintenance for substation equipment

    SciTech Connect (OSTI)

    1996-08-01

    This paper is a collection of training materials on the principles and implementation of reliability centered maintenance. The main areas discussed in this presentation are organized as follows: RCM principles and concepts; RCM tools, resources and methods; overview of the RCM process; example RCM application; living PM program; RCM implementation experience.

  3. Davis PV plant operation and maintenance manual

    SciTech Connect (OSTI)

    1994-09-01

    This operation and maintenance manual contains the information necessary to run the Photovoltaics for Utility Scale Applications (PVUSA) test facility in Davis, California. References to more specific information available in drawings, data sheets, files, or vendor manuals are included. The PVUSA is a national cooperative research and demonstration program formed in 1987 to assess the potential of utility scale photovoltaic systems.

  4. Methods for synchronizing a countdown routine of a timer key and electronic device

    SciTech Connect (OSTI)

    Condit, Reston A.; Daniels, Michael A.; Clemens, Gregory P.; Tomberlin, Eric S.; Johnson, Joel A.

    2015-06-02

    A timer key relating to monitoring a countdown time of a countdown routine of an electronic device is disclosed. The timer key comprises a processor configured to respond to a countdown time associated with operation of the electronic device, a display operably coupled with the processor, and a housing configured to house at least the processor. The housing has an associated structure configured to engage with the electronic device to share the countdown time between the electronic device and the timer key. The processor is configured to begin a countdown routine based at least in part on the countdown time, wherein the countdown routine is at least substantially synchronized with a countdown routine of the electronic device when the timer key is removed from the electronic device. A system and method for synchronizing countdown routines of a timer key and an electronic device are also disclosed.

  5. Annual summary report of the Decontamination and Decommissioning surveillance and maintenance program at Oak Ridge National Laboratory for period ending September 30, 1992

    SciTech Connect (OSTI)

    Ford, M.K.; Holder, L. Jr.

    1992-09-01

    The Oak Ridge National Laboratory (ORNL) Decontamination and Decommissioning (D D) Program is part of the Department of Energy (DOE) Environmental Restoration D D Program and has continued to provide surveillance and maintenance (S M) support for 34 surplus facilities. The objectives are (1) to ensure adequate containment of residual radioactive materials remaining in the facilities, (2) to provide safety and security controls to minimize the potential hazards to on-site personnel and to the general public, and (3) to manage the facilities in the most cost-effective manner while awaiting decommissioning. This support has included work in three principal areas: (1) S M planning, (2) routine S M, and (3) special projects designed to correct serious facility deficiencies beyond the scope of routine maintenance.

  6. Enhanced human performance of utility maintenance programs

    SciTech Connect (OSTI)

    Fresco, A.; Haber, S.; O`Brien, J.

    1993-08-01

    Assuring the safe operation of a nuclear power plant depends, to a large extent, on how effectively one understands and manages the aging-related degradation that occurs in structures, systems, and components (SSCs). Aging-related degradation is typically managed through a nuclear plant`s maintenance program. A review of 44 Maintenance Team Inspection (MTI) Reports indicated that while some plant organizations appeared to assume a proactive mode in preventing aging-related failures of their SSCs important to safety, others seemed to be taking a passive or reactive mode. Across all plants, what is clearly needed, is a strong recognition of the importance of aging-related degradation and the use of existing organizational assets to effectively detect and mitigate those effects. Many of those assets can be enhanced by the consideration of organizational and management factors necessary for the implementation of an effective aging management program. This report provides a discussion of this program.

  7. Long-Term Surveillance and Maintenance Requirements for Remediated...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Requirements for Remediated FUSRAP Sites Long-Term Surveillance and Maintenance ... to the U.S. Department of Energy (DOE) for long-term surveillance and maintenance (LTS&M). ...

  8. Long-Term Surveillance and Maintenance Program 2003 Report |...

    Broader source: Energy.gov (indexed) [DOE]

    Long-Term Surveillance and Maintenance Program 2003 Report Long-Term Surveillance and Maintenance Program 2003 Report (8.41 MB) More Documents & Publications Long-Term Surveillance ...

  9. Long-Term Surveillance Operations and Maintenance Fiscal Year...

    Broader source: Energy.gov (indexed) [DOE]

    The Long-Term Surveillance Operations and Maintenance (LTS-O&M) subtask has a critical long-term surveillance and maintenance (LTS&M) role for the U.S. Department of Energy (DOE) ...

  10. Maintenance Guide for DOE Low-Level Waste Disposal Facility ...

    Broader source: Energy.gov (indexed) [DOE]

    Maintenance Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Performance Assessments and Composite Analyses Maintenance Guide for DOE Low-Level Waste Disposal ...

  11. Y-12 demos former utilities and maintenance facility | National...

    National Nuclear Security Administration (NNSA)

    demos former utilities and maintenance facility Friday, September 26, 2014 - 1:05pm The ... 9744, a former utilities and maintenance facility occupying more than 9,000 square feet. ...

  12. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-02-13

    The Order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of Structures, Systems and Components (SSCs) that are part of the safety basis required by 10 CFR 830.202.1 at hazard category 1, 2 and 3 Department of Energy (DOE) nuclear facilities. Cancels DOE O 433.1. Canceled by DOE O 433.1B.

  13. CB-EMIS MAINTENANCE MONITORING SYSTEM

    Energy Science and Technology Software Center (OSTI)

    2006-10-01

    This system continuously monitors all components of a CB-EMIS (ANL-02-078)installation such as signals for video cameras, detector, train data, meteorological data, computer and network equipment and reports exceptions to maintenance staff so that corrections can be made as soon as possible. This monitoring system is built within Nagios (www.nagios.org), a free open source host service and network monitoring program.

  14. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-04-21

    The order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of structures, systems and components that are part of the safety basis required by 10 CFR 830.202 at hazard category 1, 2 and 3 DOE nuclear facilities. Admin Chg 1, dated 3-12-2013, supersedes DOE O 433.1B.

  15. Test Site Operations & Maintenance Safety

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Test Site Operations & Maintenance Safety - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Energy Defense Waste Management

  16. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-04-21

    The order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of structures, systems and components that are part of the safety basis required by 10 CFR 830.202 at hazard category 1, 2 and 3 DOE nuclear facilities. Admin Chg 1, dated 3-12-2013. Cancels DOE O 433.1A.

  17. FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Requirement | Department of Energy Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2013 DARM Transmittal Letter and Attachment Final.pdf (541.36 KB) More Documents & Publications FY 2012 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY_09_DM_RM_AM_Reporting_Memo_and_attachment_072009.pdf Real Property Maintenance Reporting Requirement

  18. Preventive Maintenance Strategies for Compressed Air Systems | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Preventive Maintenance Strategies for Compressed Air Systems Preventive Maintenance Strategies for Compressed Air Systems This tip sheet discusses preventive maintenance strategies for compressed air systems to avoid high equipment repair and replacement costs. COMPRESSED AIR TIP SHEET #6 Preventive Maintenance Strategies for Compressed Air Systems (August 2004) (245.23 KB) More Documents & Publications Effect of Intake on Compressor Performance Maintaining System Air Quality

  19. OPS 9.2 Shift Routines and Operating Practices 8/24/98 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 2 Shift Routines and Operating Practices 8/24/98 OPS 9.2 Shift Routines and Operating Practices 8/24/98 The objective of this surveillance is to verify that standards for the professional conduct of operations personnel are established and followed so that operator performance meets the expectations of DOE and facility management. This surveillance provides a basis for evaluating watchstanding practices of operations personnel external to the control area in various plant locations.

  20. Review of maintenance personnel practices at nuclear power plants

    SciTech Connect (OSTI)

    Chockie, A.D.; Badalamente, R.V.; Hostick, C.J.; Vickroy, S.C.; Bryant, J.L.; Imhoff, C.H.

    1984-05-01

    As part of the Nuclear Regulatory Commission (NRC) sponsored Maintenance Qualifications and Staffing Project, the Pacific Northwest Laboratory (PNL) has conducted a preliminary assessment of nuclear power plant (NPP) maintenance practices. As requested by the NRC, the following areas within the maintenance function were examined: personnel qualifications, maintenance training, overtime, shiftwork and staffing levels. The purpose of the assessment was to identify the primary safety-related problems that required further analysis before specific recommendations can be made on the regulations affecting NPP maintenance operations.

  1. Year 2000 TWRS Maintenance procedure review report

    SciTech Connect (OSTI)

    ADAMS, M.R.

    1999-02-24

    A concern exists that some equipment in use might contain microprocessors that are dependent upon a time date function. The majority of the software programming for microprocessors has only utilized a 2 digit identifier for the year. With the approach of the year 2000, (Y2K), there is concern that the date function will not be correctly recognized and some functions will not operate properly. TWRS maintenance procedures have been reviewed to identify equipment components that may not be Y2K compliant. Engineering judgment was utilized to eliminate procedures and equipment that is obviously not impacted by Y2K.

  2. Converting urban tree maintenance residue to energy

    SciTech Connect (OSTI)

    Murphey, W.K.; Massey, J.G.; Sumrall, A.

    1980-01-01

    Three methods of utilizing urban wood waste collected by a tree maintenance firm in Houston, Texas (handling 30,000 ton waste/year) are examined: (a) hauling to a remote landfill; (b) chipping and hauling to a (local) power plant and converting to electricity; and (c) chipping and selling to an outside firm for use as boiler fuel. Breakdown of costs are given for each method in monetary and energy terms. Method (b) was the cheapest, producing a net energy gain (870 million Btu/day), but the firm chose method (c), since it realized a direct monetary return.

  3. Plant maintenance and outage management issue, 2005

    SciTech Connect (OSTI)

    Agnihotri, Newal (ed.)

    2005-01-15

    The focus of the January-February issue is on plant maintenance and outage managment. Major articles/reports in this issue include: Dawn of a new era, by Joe Colvin, Nuclear Energy Institute (NEI); Plant profile: Beloyarsk NPP, Russia, by Nikolai Oshkanov, Beloyarsk NPP, Russia; Improving economic performance, by R. Spiegelberg-Planner, John De Mella, and Marius Condu, IAEA; A model for improving performance, by Pet Karns, MRO Software; ASME codes and standards, by Shannon Burke, ASME International; and, Refurbishment programs, by Craig S. Irish, Nuclear Logistics, Inc.

  4. Second Line of Defense Help Desk: Electronic Maintenance Reports - Local Maintenance Provider User Guide Rev. 1

    SciTech Connect (OSTI)

    Leigh, Richard J.

    2011-12-14

    The Electronic Maintenance Report forms present a uniform dataset for analysis of Sustainability metrics. These forms collect readily minable data while allowing the attachment of site-specific checklists or other supporting files for review by the Sustainability Manager and Program Management.

  5. Enterprise Assessments Assessment of Conduct of Maintenance at the Waste

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Isolation Pilot Plant - June 2016 | Department of Energy Conduct of Maintenance at the Waste Isolation Pilot Plant - June 2016 Enterprise Assessments Assessment of Conduct of Maintenance at the Waste Isolation Pilot Plant - June 2016 June 2016 Assessment of Conduct of Maintenance at the Waste Isolation Pilot Plant The U.S. Department of Energy Office of Environment, Safety and Health Assessments, within the independent Office of Enterprise Assessments, conducted an assessment of the conduct

  6. Maintenance & Cleaning Firm Earns Jefferson Lab's Small Business Award

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Maintaining Your Air Conditioner Maintaining Your Air Conditioner Replacing or cleaning air conditioner filters is a critical maintenance task. | Photo courtesy of ©iStockphoto/firemanYU. Replacing or cleaning air conditioner filters is a critical maintenance task. | Photo courtesy of ©iStockphoto/firemanYU. An air conditioner's filters, coils, and fins require regular maintenance for the unit to function effectively and efficiently throughout its years of service. Neglecting necessary

  7. Color Maintenance of LEDs in Laboratory and Field Applications (Technical

    Office of Scientific and Technical Information (OSTI)

    Report) | SciTech Connect Color Maintenance of LEDs in Laboratory and Field Applications Citation Details In-Document Search Title: Color Maintenance of LEDs in Laboratory and Field Applications Synopsis: To date, consideration for parametric failure of LED products has largely been focused on lumen maintenance. However, color shift is a cause of early failure for some products, and is especially important to consider in certain applications, like museums, where visual appearance is

  8. Operations & Maintenance Best Practices Guide: Release 3.0

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1.1 Chapter 11 Ten Steps to Operational Efficiency Step 1: Strive to increase management awareness and appreciation of the operations and maintenance program/department. * Consider developing a maintenance mission statement and requesting/requiring management sign-off. * Consider developing a maintenance plan and requesting/requiring management sign-off. * Begin the development of the OMETA linkages. - Develop key points of contact within other departments that can participate in the O&M

  9. Operations & Maintenance Best Practices Guide: Release 3.0

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 Why O&M? � 2.1 Introduction Effective O&M is one of the most cost-effective methods for ensuring reliability, safety, and energy efficiency. Inadequate maintenance of energy-using systems is a major cause of energy waste in both the Federal Government and the private sector. Energy losses from steam, water and air leaks, uninsulated lines, maladjusted or inoperable controls, and other losses from poor maintenance are often considerable. Good maintenance practices can generate

  10. Operations & Maintenance Best Practices Guide: Release 3.0

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    O&M Best Practices Guide, Release 3.0 6.1 Chapter 6 Predictive Maintenance Technologies 6.1 Introduction Predictive maintenance attempts to detect the onset of a degradation mechanism with the goal of correcting that degradation prior to significant deterioration in the component or equipment. The diagnostic capabilities of predictive maintenance technologies have increased in recent years with advances made in sensor technologies. These advances, breakthroughs in component sensitivities,

  11. EV Everywhere: Electric Car Safety, Maintenance, and Battery Life |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Electric Vehicle Basics » EV Everywhere: Electric Car Safety, Maintenance, and Battery Life EV Everywhere: Electric Car Safety, Maintenance, and Battery Life EV Everywhere: Electric Car Safety, Maintenance, and Battery Life Plug-in electric vehicles (also known as electric cars or EVs) are as safe and easy to maintain as conventional vehicles. While driving conditions and habits will impact vehicle operation and vehicle range, some best practices can help you maximize

  12. Planning and Reporting for Operations and Maintenance in Federal Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Savings Performance Contracts | Department of Energy Planning and Reporting for Operations and Maintenance in Federal Energy Savings Performance Contracts Planning and Reporting for Operations and Maintenance in Federal Energy Savings Performance Contracts Document provides guidance on energy savings performance contract (ESPC) project development for: Allocating operations and maintenance (O&M) and repair and replacement (R&R) responsibilities Putting in place O&M reporting

  13. Plant maintenance and advanced reactors, 2007

    SciTech Connect (OSTI)

    Agnihotri, Newal

    2007-09-15

    The focus of the September-October issue is on plant maintenance and advanced reactors. Major articles/reports in this issue include: A new day for energy in America; Committed to success more than ever, by Andy White, GE--Hitachi Nuclear Energy; Competitive technology for decades, by Steve Tritch, Westinghouse Electric Company; Pioneers of positive community relationship, by Exelon Nuclear; A robust design for 60-years, by Ray Ganthner, Areva; Aiming at no evacuation plants, by Kumiaki Moriya, Hitachi-GE Nuclear Energy, Ltd.; and, Desalination and hydrogen economy, by Dr. I. Khamis, International Atomic Energy Agency. Industry innovation articles in this issue are: Reactor vessel closure head project, by Jeff LeClair, Prairie Island Nuclear Generating Plant; and Submersible remote-operated vehicle, by Michael S. Rose, Entergy's Fitzpatrick Nuclear Station.

  14. Estimated Maintenance Cost Savings from a Geothermal Heat Pump...

    Office of Scientific and Technical Information (OSTI)

    Contract at Fort Polk, LA Citation Details In-Document Search Title: Estimated Maintenance Cost Savings from a Geothermal Heat Pump Energy Savings Performance Contract at ...

  15. Community Wind Handbook/Plan for Maintenance | Open Energy Information

    Open Energy Info (EERE)

    Community Wind HandbookPlan for Maintenance < Community Wind Handbook Jump to: navigation, search WIND ENERGY STAKEHOLDER ENGAGEMENT & OUTREACHCommunity Wind Handbook...

  16. Annual Report of Site Surveillance and Maintenance Activities...

    Office of Legacy Management (LM)

    .........24 2.7.3 Solar Ponds Plume Treatment System ... Maintenance Activities at the Rocky Flats Site-CY 2015 U.S. Department of Energy Doc. No. ...

  17. DOE-STD-1181-2004; Facility Maintenance Management Functional...

    Energy Savers [EERE]

    ... Assess the instructor qualifications for a selected maintenance training program to verify that instructors have the necessary credentials and skills to provide the training. ...

  18. Los Alamos Site Office Nuclear Maintenance Management Program...

    Office of Environmental Management (EM)

    Management Evaluations Activity Report for the Los Alamos Site Office Nuclear Maintenance Management Program Oversight Self-Assessment Dates of Activity : 11142011 - 11182011 ...

  19. ANNUAL MAINTENANCE AND LEAK TESTING FOR THE 9975 SHIPPING PACKAGE

    SciTech Connect (OSTI)

    Trapp, D.

    2014-08-25

    The purpose of this document is to provide step-by-step instructions for the annual helium leak test certification and maintenance of the 9975 Shipping Package.

  20. Technical information report: Plasma melter operation, reliability, and maintenance analysis

    SciTech Connect (OSTI)

    Hendrickson, D.W. [ed.

    1995-03-14

    This document provides a technical report of operability, reliability, and maintenance of a plasma melter for low-level waste vitrification, in support of the Hanford Tank Waste Remediation System (TWRS) Low-Level Waste (LLW) Vitrification Program. A process description is provided that minimizes maintenance and downtime and includes material and energy balances, equipment sizes and arrangement, startup/operation/maintence/shutdown cycle descriptions, and basis for scale-up to a 200 metric ton/day production facility. Operational requirements are provided including utilities, feeds, labor, and maintenance. Equipment reliability estimates and maintenance requirements are provided which includes a list of failure modes, responses, and consequences.

  1. Federal Facilities Maintenance, Repair Report Calls for Action

    SciTech Connect (OSTI)

    Bartlett, Rosemarie

    2012-10-01

    This article is an overview of a recent report by the Federal Facilities Council on "Predicting Outcomes from Investments in Maintenance and Repair of Federal Facilities."

  2. Project Profile: Innovative Application of Maintenance-Free Phase...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Innovative Application of Maintenance-Free Phase-Change Thermal Energy Storage for Dish ... a thermal energy storage (TES) system that, when combined with Infinia's ...

  3. Operations and Maintenance Best Practices--A Guide to Achieving...

    Office of Scientific and Technical Information (OSTI)

    This guide is designed to serve as a source for O&M management and technical staff. It ... OPERATION; EFFICIENCY; MAINTENANCE; MANAGEMENT; RECOMMENDATIONS Word Cloud More Like ...

  4. Operations & Maintenance Best Practices - A Guide to Achieving...

    Office of Scientific and Technical Information (OSTI)

    This guide highlights operations and maintenance programs targeting energy and water ... O&M management, technologies, energy and water efficiency, and cost-reduction approaches. ...

  5. Color Maintenance of LEDs in Laboratory and Field Applications...

    Office of Scientific and Technical Information (OSTI)

    Royer, Michael P.; Tuttle, Ralph; Rosenfeld, Scott M.; Miller, Naomi J. Light-emitting diode (LED), color shift, color stability, color maintenance, warranty Light-emitting...

  6. Maintenance personnel performance simulation (MAPPS): a model for predicting maintenance performance reliability in nuclear power plants

    SciTech Connect (OSTI)

    Knee, H.E.; Krois, P.A.; Haas, P.M.; Siegel, A.I.; Ryan, T.G.

    1983-01-01

    The NRC has developed a structured, quantitative, predictive methodology in the form of a computerized simulation model for assessing maintainer task performance. Objective of the overall program is to develop, validate, and disseminate a practical, useful, and acceptable methodology for the quantitative assessment of NPP maintenance personnel reliability. The program was organized into four phases: (1) scoping study, (2) model development, (3) model evaluation, and (4) model dissemination. The program is currently nearing completion of Phase 2 - Model Development.

  7. Moment-Based Probability Modeling and Extreme Response Estimation, The FITS Routine Version 1.2

    SciTech Connect (OSTI)

    MANUEL,LANCE; KASHEF,TINA; WINTERSTEIN,STEVEN R.

    1999-11-01

    This report documents the use of the FITS routine, which provides automated fits of various analytical, commonly used probability models from input data. It is intended to complement the previously distributed FITTING routine documented in RMS Report 14 (Winterstein et al., 1994), which implements relatively complex four-moment distribution models whose parameters are fit with numerical optimization routines. Although these four-moment fits can be quite useful and faithful to the observed data, their complexity can make them difficult to automate within standard fitting algorithms. In contrast, FITS provides more robust (lower moment) fits of simpler, more conventional distribution forms. For each database of interest, the routine estimates the distribution of annual maximum response based on the data values and the duration, T, over which they were recorded. To focus on the upper tails of interest, the user can also supply an arbitrary lower-bound threshold, {chi}{sub low}, above which a shifted distribution model--exponential or Weibull--is fit.

  8. SEP Request for Approval Form 6 - Non-Routine Adjustments | Department of

    Broader source: Energy.gov (indexed) [DOE]

    Energy 6_Non-Routine-Adjustments.docx (25.82 KB) More Documents & Publications Superior Energy Performance Enrollment and Application Forms SEP Request for Approval Form 7 - Other Situations for Consumption Adjustment SEP Request for Approval Form 4 - Alternative Adjustment Model Application Methodology

  9. Reliability centered maintenance (RCM) for substations project overview

    SciTech Connect (OSTI)

    Lyons, P.F.

    1996-08-01

    An EPRI Tailored Collaboration project establishing guidelines and tools for implementing Reliability Centered Maintenance (RCM) in substations is nearing completion and final results are being presented at this Substation RCM Conference. The ultimate goal of this RCM project is to help utilities slash substation operations and maintenance costs by optimizing equipment maintenance intervals. Preventive maintenance (PM) programs typically have been developed on a component-by-component basis, relying heavily on equipment vendors` maintenance recommendations. RCM is a logical alternative to traditional PM programs. It is intelligent, common sense maintenance that is function-based rather than component-based. First developed by the airline industry in the 1960s and further developed and applied to the nuclear industry by EPRI in the 1980s, RCM ranks the importance of each function of a system, calculates the impact the loss of the function would have on the overall system, and drives the design of appropriate maintenance tasks for each function. The nuclear industry reaped savings of at least 25% by adopting RCM, and one utility that tried this approach for substation maintenance reported savings of 13% in one year.

  10. Plant maintenance and advanced reactors issue, 2008

    SciTech Connect (OSTI)

    Agnihotri, Newal

    2009-09-15

    The focus of the September-October issue is on plant maintenance and advanced reactors. Major articles/reports in this issue include: Technologies of national importance, by Tsutomu Ohkubo, Japan Atomic Energy Agency, Japan; Modeling and simulation advances brighten future nuclear power, by Hussein Khalil, Argonne National Laboratory, Energy and desalination projects, by Ratan Kumar Sinha, Bhabha Atomic Research Centre, India; A plant with simplified design, by John Higgins, GE Hitachi Nuclear Energy; A forward thinking design, by Ray Ganthner, AREVA; A passively safe design, by Ed Cummins, Westinghouse Electric Company; A market-ready design, by Ken Petrunik, Atomic Energy of Canada Limited, Canada; Generation IV Advanced Nuclear Energy Systems, by Jacques Bouchard, French Commissariat a l'Energie Atomique, France, and Ralph Bennett, Idaho National Laboratory; Innovative reactor designs, a report by IAEA, Vienna, Austria; Guidance for new vendors, by John Nakoski, U.S. Nuclear Regulatory Commission; Road map for future energy, by John Cleveland, International Atomic Energy Agency, Vienna, Austria; and, Vermont's largest source of electricity, by Tyler Lamberts, Entergy Nuclear Operations, Inc. The Industry Innovation article is titled Intelligent monitoring technology, by Chris Demars, Exelon Nuclear.