National Library of Energy BETA

Sample records for roller shades procurement

  1. Performance of Integrated Systems of Automated Roller Shade Systems and Daylight Responsive Dimming Systems

    SciTech Connect (OSTI)

    Park, Byoung-Chul; Choi, An-Seop; Jeong, Jae-Weon; Lee, Eleanor S.

    2010-07-08

    Daylight responsive dimming systems have been used in few buildings to date because they require improvements to improve reliability. The key underlying factor contributing to poor performance is the variability of the ratio of the photosensor signal to daylight workplane illuminance in accordance with sun position, sky condition, and fenestration condition. Therefore, this paper describes the integrated systems between automated roller shade systems and daylight responsive dimming systems with an improved closed-loop proportional control algorithm, and the relative performance of the integrated systems and single systems. The concept of the improved closed-loop proportional control algorithm for the integrated systems is to predict the varying correlation of photosensor signal to daylight workplane illuminance according to roller shade height and sky conditions for improvement of the system accuracy. In this study, the performance of the integrated systems with two improved closed-loop proportional control algorithms was compared with that of the current (modified) closed-loop proportional control algorithm. In the results, the average maintenance percentage and the average discrepancies of the target illuminance, as well as the average time under 90percent of target illuminance for the integrated systems significantly improved in comparison with the current closed-loop proportional control algorithm for daylight responsive dimming systems as a single system.

  2. Procurement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Procurement handshake Have you wondered about selling your goods or services to a government contractor? Welcome to Pacific Northwest National Laboratory. As a Department of Energy laboratory, we are dedicated to competitively procuring our supplies and services to the best of our ability in a cost-effective and timely manner. The Laboratory supports the DOE's small business objectives by ensuring that a good percentage of our acquisitions are made with small and disadvantaged businesses. If you

  3. Rolling, Rolling, Rolling: Roller Window Shades

    Broader source: Energy.gov [DOE]

    There's a lot of talk these days about installing new energy-efficient windows. Thanks to a Federal tax credit of up to $1,500, window advertisements, both print and radio and TV broadcasting, are aplenty.

  4. Procurement Integrity

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    To preserve the integrity of the Federal procurement process and assure fair treatment of bidders, offerors and contractors, laws govern the procurement process and the manner in ...

  5. Variable loading roller

    DOE Patents [OSTI]

    Williams, Daniel M.

    1989-01-01

    An automatic loading roller for transmitting torque in traction drive devices in manipulator arm joints includes a two-part camming device having a first cam portion rotatable in place on a shaft by an input torque and a second cam portion coaxially rotatable and translatable having a rotating drive surface thereon for engaging the driven surface of an output roller with a resultant force proportional to the torque transmitted. Complementary helical grooves on the respective cam portions interconnected through ball bearings interacting with those grooves effect the rotation and translation of the second cam portion in response to rotation of the first.

  6. Variable loading roller

    DOE Patents [OSTI]

    Williams, D.M.

    1988-01-21

    An automatic loading roller for transmitting torque in traction drive devices in manipulator arm joints includes a two-part camming device having a first cam portion rotatable in place on a shaft by an input torque and a second cam portion coaxially rotatable and translatable having a rotating drive surface thereon for engaging the driven surface of an output roller with a resultant force proportional to the torque transmitted. Complementary helical grooves in the respective cam portions interconnected through ball bearings interacting with those grooves effect the rotation and translation of the second cam portion in response to rotation of the first. 14 figs.

  7. EVALUATION OF A LOW FRICTION - HIGH EFFICIENCY ROLLER BEARING ENGINE

    SciTech Connect (OSTI)

    Kolarik, Robert V. II; Shattuck, Charles W.; Copper, Anthony P.

    2009-06-30

    This Low Friction (High Efficiency Roller Bearing) Engine (LFE) report presents the work done by The Timken Company to conduct a technology demonstration of the benefits of replacing hydrodynamic bearings with roller bearings in the crankshaft and camshaft assemblies of an internal combustion engine for the purpose of collecting data sufficient to prove merit. The engines in the present study have been more extensively converted to roller bearings than any previous studies (40 needle roller bearings per engine) to gain understanding of the full potential of application of bearing technology. The project plan called for comparative testing of a production vehicle which was already respected for having demonstrated low engine friction levels with a rollerized version of that engine. Testing was to include industry standard tests for friction, emissions and fuel efficiency conducted on instrumented dynamometers. Additional tests for fuel efficiency, cold start resistance and other measures of performance were to be made in the actual vehicle. Comparative measurements of noise, vibration and harshness (NVH), were planned, although any work to mitigate the suspected higher NVH level in the rollerized engine was beyond the scope of this project. Timken selected the Toyota Avalon with a 3.5L V-6 engine as the test vehicle. In an attempt to minimize cost and fabrication time, a ‘made-from’ approach was proposed in which as many parts as possible would be used or modified from production parts to create the rollerized engine. Timken commissioned its test partner, FEV Engine Technology, to do a feasibility study in which they confirmed that using such an approach was possible to meet the required dimensional restrictions and tolerances. In designing the roller bearing systems for the crank and cam trains, Timken utilized as many production engine parts as possible. The crankshafts were produced from production line forgings, which use Timken steel, modified with special machining and heat treatment. Timken designed and manufactured all of the roller bearing related components such as the thrust bearing package. The production connecting rods and camshafts could not be used for the roller bearing engine, so new ones were produced according to the team’s designs using Timken steel. The remaining miscellaneous components were designed and procured by FEV. Timken prepared a display version of the crankshaft portion of the production engine without connecting rods which could be driven by a motor through a cogged-belt and electrically actuated clutch arrangement. A modified version was also made in which the engine was outfitted with roller bearings on the main bearing positions. Preliminary tests showed that the rollerized engine was running with 1/3 less friction than the standard display engine. Additional friction testing and noise characterization was cut short because of shipping damage to the rollerized engine display and because of other project priorities. The team did successfully demonstrate the ability to package roller bearings satisfactorily in numerous locations in a typical automotive engine. The scope of this project did not include durability demonstration and that subject would have to be addressed in any follow-on work. In the actual test phase, the rollerized engine did show significantly less friction in motored dynamometer tests compared to its production equivalent. The 5-10% improvement measured in this study was about half that seen in other studies. However, the fired test results did not show a reduction in friction which did not match prior experience or expectations. Subsequent teardown and inspection of the rollerized engine revealed potential sources of excessive friction in the experimental application. These features would be eliminated in a design not based on modification of production parts. The team is confident (based on experience) that friction reduction would be realized with proper modifications.

  8. Procurement | NREL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Procurement The National Renewable Energy Laboratory (NREL) offers numerous procurement opportunities to help commercialize renewable energy technologies and supply the laboratory with essential products and services. NREL acquires a variety of products and services, all of which helps federally funded research and technologies reach the marketplace. The following types of goods or services are typically procured: Laboratory supplies/office supplies Scientific equipment and periodicals

  9. Procurement Integrity

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ------------------------------Chapter 3.1 (Dec 2015) 1 Procurement Integrity [Reference: 41 U.S.C. 423, FAR 3.104, DEAR 903.104] Overview This section discusses the requirements of the Procurement Integrity Act and its impact on Federal employees. Background The Department of Energy (DOE), like most federal agencies, purchases many products and services from the private sector. To preserve the integrity of the Federal procurement process and assure fair treatment of bidders, offerors and

  10. Roller belleville spring damper

    SciTech Connect (OSTI)

    Hebel, J.B.

    1981-07-07

    A double acting damper for use in rotary drilling includes a splined tubular telescopic joint and employs plural paralleled stacks of double acting series stacked roller belleville spring washers in an annular pocket between the inner and outer tubular members of the joint. The springs, spline and telescopic bearings are in an oil filled volume sealed from the outside by a pressure seal at the lower end of the damper and a floating seal at the upper end. Electric and magnetic means are provided to check on the condition and quantity of the lubricant.

  11. Procurement Integrity

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ---...Chapter 3.1 (Dec 2015) 1 Procurement Integrity Reference: 41 U.S.C. 423, FAR 3.104, DEAR 903.104 Overview This section discusses the requirements ...

  12. Procurement Integrity Brochure What is Procurement Integrity?

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procurement Integrity Brochure What is Procurement Integrity? The Department of Energy, like most federal agencies, purchases many products and services from the private sector. To preserve the integrity of the Federal procurement process and assure fair treatment of bidders, offerors, and contractors, laws govern the procurement process and the manner in which federal and contractor personnel conduct business with each other. One of these statutes is Section 27 of the Office of Federal

  13. Procurement - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Procurement by Website Administrator Back

  14. Solar Utility Procurement Specialist

    Broader source: Energy.gov [DOE]

    Alternate Title(s):Renewable Energy Procurement Associate; Renewable Energy Transactions Specialist;

  15. Socioeconomic procurement goals and achievements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Socioeconomic procurement goals and achievements Socioeconomic procurement goals and achievements LANL ensures that a percentage of procurements are placed with small and other...

  16. Procurement | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Procurement Services Procurement Services Headquarters Services DOING BUSINESS WITH HEADQUARTERS Electronic Business Innovation - The second (2nd) generation of a secure, web-enabled system, the Strategic Integrated Procurement Enterprise System (STRIPES), was implemented in April 2008. STRIPES can accomodate procurement and financial assistance transactions at all dollar values. STRIPES (internal interface) and FedConnect.net (external interface) provides for the posting of solicitations,

  17. Centralized Procurement Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Centralized Procurement Program What's New Who to Contact Current Products BOAs MOC Integrated Team Program Elements Future Products Welcome to the Carlsbad Field Office’s (CBFO) Centralized Procurement Program (CPP) Web Page. The purpose of the Centralized Procurement Program is to provide a standardized, economical system of acquisition and distribution of containers and equipment used for shipping Transuranic (TRU) Waste to the Waste Isolation Pilot Plant (WIPP). The program is available

  18. Procurable Products, Services

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    printed wiring boards (PWB) using performance and design specifications. Commercial products and services procurement The following items are purchased through Just-In-Time...

  19. Procurement and Materials Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Home Washington River Protection Solutions | Hanford.gov | Energy.gov Procurement and Materials Management Small Business Resources Small ... There are no upcoming events in the system. ...

  20. HUD Federal Procurement Workshop

    Broader source: Energy.gov [DOE]

    The U.S. Housing and Urban Development is hosting a two-day training addressing both management and construction development procurement. Training topics range from careful preplanning and the basics of purchasing to unique factors in tribal housing purchasing, practical how-tos of procurement planning, and policy development.

  1. Procurement | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Apply for Our Jobs Our Jobs Working at NNSA Blog Home About Us Our Operations Acquisition and Project Management Small Business Procurement Procurement The NNSA's Office ...

  2. SREC Procurement Program

    Broader source: Energy.gov [DOE]

    NOTE: The auction for procurement for SRECs for the year 2015 were announced on April 29, 2015. Delmarva opted to accept additional 3,000 SRECs above the original 9,000 in the base solicitation. 

  3. Procurement Directors DATE: TO:

    Broader source: Energy.gov (indexed) [DOE]

    Sequence 211 cause of commercial purchase orders. Government procurement. DoD, GSA, and NASA published a RIN 9000-AK46 proposed rule in the Federal Register at March l5, 2007 71 FR...

  4. EM Major Procurements

    Broader source: Energy.gov [DOE]

    Following is a listing of major procurement actions currently being competed by the Office of Environmental Management.  Information contained in the report is based on publicly available...

  5. WIPP Opportunities - Procurement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NWP Procurement Services Staff Directional Map to WIPP Procurement Sources Sought Open Requests for Proposals Commodities Used by WIPP NWP General Terms & Conditions for Commercial Items (10-12, Rev 0) NWP General Provisions for Cost Reimbursement Contracts (10-12, Rev 0) NWP General Provisions for Firm Fixed Price Construction Subcontracts (10-12, Rev 0) NWP General Provisions for Firm Fixed Price Orders (10-12, Rev. 0) Representations and Certifications Greater than $25,000

  6. TO: Procurement Directors FROM: Director, Policy Division

    Broader source: Energy.gov (indexed) [DOE]

    4 DATE: April 7, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT:...

  7. TO: Procurement Directors FROM: Director, Policy Division

    Energy Savers [EERE]

    POLICY FLASH 2011-56 DATE: March 16, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance...

  8. NNSA Procurement Perspective - Joe Waddell, NNSA Senior Procurement

    Energy Savers [EERE]

    Executive | Department of Energy Perspective - Joe Waddell, NNSA Senior Procurement Executive NNSA Procurement Perspective - Joe Waddell, NNSA Senior Procurement Executive SPE Current Focus NNSA M&O Contracting Governance Structure Improving Work Authorization (WA) Process Improving Project Management PDF icon Workshop 2015 - Waddell_NNSA Procurement Perspective.pdf More Documents & Publications Aligning Contract Incentives 2015 DOE Acquisition and Project Management (APM) Workshop

  9. Procurement Services | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procurement Services Procurement Services Headquarters Services DOING BUSINESS WITH HEADQUARTERS Electronic Business Innovation - The second (2nd) generation of a secure, web-enabled system, the Strategic Integrated Procurement Enterprise System (STRIPES), was implemented in April 2008. STRIPES can accomodate procurement and financial assistance transactions at all dollar values. STRIPES (internal interface) and FedConnect.net (external interface) provides for the posting of solicitations,

  10. DOE - NNSA/NFO -- Procurement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Procurement NNSA/NFO Language Options U.S. DOE/NNSA - Nevada Field Office Procurement This page is designed to help you do business with us. It includes links to: Federal Business Opportunities NNSA's Active Contract Solicitations NNSA's Acquisition Forecast NNSA/NFO's Management & Operating (M&O) Prime Contractor's (i.e., National Securities Technologies, LLC) (NSTec) website for "Doing Business with NSTec Procurement" for Procurement Forecasts, Points of Contact, and other

  11. EWONAP Procurement Fundamentals

    Broader source: Energy.gov [DOE]

    HUD's Eastern Woodlands Office of Native American Programs in collaboration with the Seminole Tribe of Florida Native Learning Center invites you to attend the Procurement Fundamentals training instructed by Vince Franco, Compliance & Resource Development Director of the Native Learning Center in Atlanta, Georgia on September 8-9, 2014.

  12. Oak Ridge Associated Universities Procurement Questionnaire Applicatio...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Associated Universities Procurement Questionnaire Application System Supplier Profile PIA, Oak ridge Operations Office Oak Ridge Associated Universities Procurement Questionnaire ...

  13. Procurement Division Introduction | Princeton Plasma Physics...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Organization Business Operations Procurement Division Procurement Division Introduction Travel and Conference Services Careers Human Resources Directory Environment,...

  14. Procurement Data Reporting

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 (April 2012) 1 Assigning Identifying Numbers Outside of the Strategic Integrated Procurement Enterprise System (STRIPES) [References: DOE O 540.1B, AL 2010-03, AL 2011-30, Cancellation Notice] I. Overview This section provides guidance on the DOE's procedures for assigning identifying numbers to all new requisitions, solicitations and business instruments processed outside of STRIPES. This Guide Chapter does not apply to instrument numbers issued and business instruments awarded prior to the

  15. Sensing roller for in-process thickness measurement

    DOE Patents [OSTI]

    Novak, J.L.

    1996-07-16

    An apparatus and method are disclosed for processing materials by sensing roller, in which the sensing roller has a plurality of conductive rings (electrodes) separated by rings of dielectric material. Sensing capacitances or impedances between the electrodes provides information on thicknesses of the materials being processed, location of wires therein, and other like characteristics of the materials. 6 figs.

  16. Sensing roller for in-process thickness measurement

    DOE Patents [OSTI]

    Novak, James L.

    1996-01-01

    An apparatus and method for processing materials by sensing roller, in which the sensing roller has a plurality of conductive rings (electrodes) separated by rings of dielectric material. Sensing capacitances or impedances between the electrodes provides information on thicknesses of the materials being processed, location of wires therein, and other like characteristics of the materials.

  17. NNSA Procurement Perspective - Joe Waddell, NNSA Senior Procurement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Senior Procurement Executive SPE Current Focus NNSA M&O Contracting Governance Structure Improving Work Authorization (WA) Process Improving Project Management PDF icon Workshop ...

  18. Landscaping for Shade | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Solar heat absorbed through windows and roofs can increase cooling costs, and ... deciduous tree planted near your home will begin shading windows the first year. ...

  19. Contracts & Procurement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Uranium Hexafluoride (DUF6) Conversion Facilities Project Procurement Links EM Consolidated Business Center Current Solicitations DOE Acquisition Forecast FedBizOpps.gov FedConnect

  20. Industry Interactive Procurement System (IIPS)

    Broader source: Energy.gov [DOE]

    Presentation on DOE’s Industry Interactive Procurement System (IIPS) presented at the PEM fuel cell pre-solicitation meeting held May 26, 2005 in Arlington, VA.

  1. System for automatically aligning a support roller system under a rotating body

    DOE Patents [OSTI]

    Singletary, B. Huston (Oak Ridge, TN)

    1983-01-01

    Two support rings on a rotatable drum respectively engage conically tapered nd surfaces of support rollers mounted on pivot universally relative to its axis of rotation and translate therealong. Rotation of the drum on differential conical support roller diameters causes pivotal steering and axial translation of support roller until roller is centered on support rings.

  2. System for automatically aligning a support roller system under a rotating body

    DOE Patents [OSTI]

    Singletary, B.H.

    1982-07-21

    Two support rings on a rotatable drum respectively engage conically tapered end surfaces of support rollers mounted on pivot universally relative to its axis of rotation and translate therealong. Rotation of the drum on differential conical support roller diameters causes pivotal steering and axial translation of support roller until roller is centered on support rings.

  3. Partial Shade Stress Test for Thin-Film Photovoltaic Modules...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Partial Shade Stress Test for Thin-Film Photovoltaic Modules Preprint Timothy J. ... Partial shade stress test for thin-film photovoltaic modules Timothy J Silverman , ...

  4. Partial Shading in Monolithic Thin Film PV Modules: Analysis...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Partial Shading in Monolithic Thin Film PV Modules: Analysis and Design Partial Shading in Monolithic Thin Film PV Modules: Analysis and Design Presented at the PV Module ...

  5. Highly Insulating Residential Windows Using Smart Automated Shading...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Highly Insulating Residential Windows Using Smart Automated Shading Highly Insulating Residential Windows Using Smart Automated Shading Addthis 1 of 3 Residential Smart Window with ...

  6. One Procurement Director's Perspective - Patricia Schuneman, Chicago

    Energy Savers [EERE]

    Procurement Director | Department of Energy Procurement Director's Perspective - Patricia Schuneman, Chicago Procurement Director One Procurement Director's Perspective - Patricia Schuneman, Chicago Procurement Director I want you to do things "The Chicago Way" What are you prepared to do? Topics Discussed: Develop Our Employees Encourage Creativity Care for Our Employees PDF icon Workshop 2015 - Schuneman_One Procurement Dir's Perspective.pdf More Documents & Publications 2015

  7. To: Procurement Directors From: Director Contract...

    Broader source: Energy.gov (indexed) [DOE]

    Date: March 2, 2012 To: Procurement Directors From: Director Contract and Financial Assistance Policy Division Office of Policy Office of Procurement and Assistance Management...

  8. Guidance for Procurement Officials | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for Procurement Officials Guidance for Procurement Officials Acquisition Regulations Federal Acquisition Regulation (FAR) Department of Energy Acquisition Regulation (DEAR) Acquisition Policy Acquisition Letters Acquisition Guidance Acquisition Guide Contracting for Support Services Department of Energy Acquisition System - A Guide for Executives Ethics in Procurement Lobbying Brochure Procurement Integrity Brochure Unsolicited Proposals Balanced scorecard Balanced Scorecard performance

  9. Procurement Division | Princeton Plasma Physics Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Procurement Division Procurement Division Introduction Travel and Conference Services Careers/ Human Resources Directory Environment, Safety & Health Furth Plasma Physics Library Lab Leadership Organization Chart Technology Transfer Contact Us Business Operations Procurement Division Procurement Division Introduction Travel and Conference Services Careers/ Human Resources Directory Environment, Safety & Health Furth Plasma Physics Library Lab Leadership Organization Chart Technology

  10. Procurement Division Introduction | Princeton Plasma Physics Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Procurement Division Procurement Division Introduction Travel and Conference Services Careers/ Human Resources Directory Environment, Safety & Health Furth Plasma Physics Library Lab Leadership Organization Chart Technology Transfer Contact Us Business Operations Procurement Division Procurement Division Introduction Travel and Conference Services Careers/ Human Resources Directory Environment, Safety & Health Furth Plasma Physics Library Lab Leadership Organization Chart Technology

  11. Affirmative Procurement | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Affirmative Procurement Affirmative Procurement Y-12 practices affirmative procurement, purchasing environmentally friendly products, including those with reduced packaging and those manufactured totally or in part from recovered/recycled materials. Federal agencies and their contractors are required to establish affirmative procurement programs as directed by Section 6002 of the Resource Conservation and Recovery Act (RCRA); Executive Order 12873; Federal Acquisition Recycling and Waste

  12. DOE - RL Contracts/Procurements - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Procurements DOE-RL Contracts/Procurements RL Contracts & Procurements Home Prime Contracts Current Solicitations Other Sources DOE RL Contracting Officers DOE RL Contracting Officer Representatives DOE - RL Contracts/Procurements Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size DOE - RL Contracts/Procurements Located just north of the city of Richland, in the southeastern part of Washington State, the 586-square-mile Hanford Site is managed by the U.S.

  13. ADMINISTRATIVE RECORDS SCHEDULE 3: PROCUREMENT, SUPPLY, AND GRANT...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: PROCUREMENT, SUPPLY, AND GRANT RECORDS ADMINISTRATIVE RECORDS SCHEDULE 3: PROCUREMENT, SUPPLY, AND GRANT RECORDS The basic procurement files reflect a considerable range of ...

  14. Change to Procurement Evaluation & Re-Engineering Team (PERT...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Change to Procurement Evaluation & Re-Engineering Team (PERT) Review Cycle Change to Procurement Evaluation & Re-Engineering Team (PERT) Review Cycle The Senior Procurement ...

  15. Procuring Solar Energy Guide Contacts | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procuring Solar Energy Guide Contacts Procuring Solar Energy Guide Contacts Contact information for the Procuring Solar Energy: A Guide for Federal Facility Decision Makers is ...

  16. NNSA Procurement Projects Perspective - Bob Raines, Associate...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Projects Perspective - Bob Raines, Associate Administrator for Acquisition and Project Management, NNSA NNSA Procurement Projects Perspective - Bob Raines, Associate Administrator ...

  17. Highly Insulating Residential Windows Using Smart Automated Shading |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Highly Insulating Residential Windows Using Smart Automated Shading Highly Insulating Residential Windows Using Smart Automated Shading Addthis 1 of 3 Residential Smart Window with integrated sensors, control logic and a motorized shade between glass panes. Image: Lawrence Berkeley National Laboratory 2 of 3 Residential Smart Window with integrated sensors, control logic and a motorized shade between glass panes. Image: Lawrence Berkeley National Laboratory 3 of 3

  18. Evaluation of Cellular Shades in the PNNL Lab Homes

    SciTech Connect (OSTI)

    Petersen, Joseph M.; Sullivan, Greg; Cort, Katherine A.; Merzouk, Massine B.; Weber, Jessica M.

    2015-10-28

    Understand the HVAC energy impact due to scheduled operation of Hunter Douglas cellular shades in the PNNL lab homes.

  19. Oak Ridge Associated Universities Procurement Questionnaire Application

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    System Supplier Profile PIA, Oak ridge Operations Office | Department of Energy Associated Universities Procurement Questionnaire Application System Supplier Profile PIA, Oak ridge Operations Office Oak Ridge Associated Universities Procurement Questionnaire Application System Supplier Profile PIA, Oak ridge Operations Office Oak Ridge Associated Universities Procurement Questionnaire Application System Supplier Profile PIA, Oak ridge Operations Office PDF icon Oak Ridge Associated

  20. Procurement | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Home / About / Our Operations / Acquisition and Project Management / Small Business Procurement The NNSA's Office of Acquisition & Project Management (APM) offers an 18-36 month procurement forecast that uses information obtained through the NNSA Procurement information system. This electronic interface allows small businesses to explore upcoming opportunities. This information provides the Administration's best projections of forecasted prime and subcontracting opportunities over the

  1. Procuring Architectural and Engineering Services for Energy Efficiency...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procuring Architectural and Engineering Services for Energy Efficiency and Sustainability Procuring Architectural and Engineering Services for Energy Efficiency and Sustainability ...

  2. Office of Federal Procurement (OFPP) Determination of Executive...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Procurement (OFPP) Determination of Executive Compensation Benchmark Amount for ... Office of Federal Procurement (OFPP) Determination of Executive Compensation Benchmark ...

  3. WIPP Opportunities - Procurement - Sources Sought

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Procurement Sources Sought This page displays a listing Sources Sought. If you are interested in submitting an outline, please contact the cognizant buyer to find out more. Please respond by e-mail to the buyer and include: Close date Buyer's name Your name or name of contact E-mail address and/or phone number Type of business All outlines must be received on or before the listed closing date. _________________________________________ Sources Sought Under Ground Ventilation System Contractor

  4. Pin and roller attachment system for ceramic blades

    DOE Patents [OSTI]

    Shaffer, James E. (Maitland, FL)

    1995-01-01

    In a turbine, a plurality of blades are attached to a turbine wheel by way of a plurality of joints which form a rolling contact between the blades and the turbine wheel. Each joint includes a pin and a pair of rollers to provide rolling contact between the pin and an adjacent pair of blades. Because of this rolling contact, high stress scuffing between the blades and the turbine wheel reduced, thereby inhibiting catastrophic failure of the blade joints.

  5. Pin and roller attachment system for ceramic blades

    DOE Patents [OSTI]

    Shaffer, J.E.

    1995-07-25

    In a turbine, a plurality of blades are attached to a turbine wheel by way of a plurality of joints which form a rolling contact between the blades and the turbine wheel. Each joint includes a pin and a pair of rollers to provide rolling contact between the pin and an adjacent pair of blades. Because of this rolling contact, high stress scuffing between the blades and the turbine wheel reduced, thereby inhibiting catastrophic failure of the blade joints. 3 figs.

  6. Procurement Options for New Renewable Electricity Supply

    SciTech Connect (OSTI)

    Kreycik, C. E.; Couture, T. D.; Cory, K. S.

    2011-12-01

    State renewable portfolio standard (RPS) policies require utilities and load-serving entities (LSEs) to procure renewable energy generation. Utility procurement options may be a function of state policy and regulatory preferences, and in some cases, may be dictated by legislative authority. Utilities and LSEs commonly use competitive solicitations or bilateral contracting to procure renewable energy supply to meet RPS mandates. However, policymakers and regulators in several states are beginning to explore the use of alternatives, namely feed-in tariffs (FITs) and auctions to procure renewable energy supply. This report evaluates four procurement strategies (competitive solicitations, bilateral contracting, FITs, and auctions) against four main criteria: (1) pricing; (2) complexity and efficiency of the procurement process; (3) impacts on developers access to markets; and (4) ability to complement utility decision-making processes. These criteria were chosen because they take into account the perspective of each group of stakeholders: ratepayers, regulators, utilities, investors, and developers.

  7. TO: Procurement Directors FROM: Director, Policy Division

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9 DATE: March 21, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: SBA Final Rule affecting the 8(a) Business Development Program SUMMARY: On February 11, 2011, the Small Business Administration (SBA) issued the attached final rule revising the regulations governing the 8(a) Business Development program, small business size regulations, and Small Disadvantaged Business (SDB) status

  8. TO: Procurement Directors FROM: Director, Policy Division

    Office of Environmental Management (EM)

    9 DATE: March 21, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: SBA Final Rule affecting the 8(a) Business Development Program SUMMARY: On February 11, 2011, the Small Business Administration (SBA) issued the attached final rule revising the regulations governing the 8(a) Business Development program, small business size regulations, and Small Disadvantaged Business (SDB) status

  9. TO: Procurement Directors FROM: Director, Policy Division

    Office of Environmental Management (EM)

    2 DATE: February 11, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Department of Energy Acquisition Regulation (DEAR) Final Rule for Subchapters A, B, and C SUMMARY: Department of Energy Acquisition Regulation (DEAR) Final Rule for Subchapters A, B, and C was published February 11, 2011, in the Federal Register 76 FR 7685. The changes are effective March 14, 2011. This Flash will

  10. TO: Procurement Directors FROM: Director, Policy Division

    Office of Environmental Management (EM)

    63 DATE: April 7, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Updated Reporting Requirement Checklists and Research Performance Progress Report (RPPR) SUMMARY: Policy Flash 2011-46, transmitted updated copies of the Reporting Requirements Checklist to add coverage for For-Profit audits. This Flash transmits additional updates to the checklists to clarify the submission

  11. TO: Procurement Directors FROM: Director, Policy Division

    Office of Environmental Management (EM)

    5 DATE: June 23, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: U.S. Department of Energy - Guide to Financial Assistance - Audit Requirements for For-Profit Organizations SUMMARY: Policy Flash 2011-46, which was issued in association with the Office of Risk Management, provided the final audit guidance documents to assist for-profit recipients in complying with 10 CFR 600.316. In

  12. Enabling Sustainable Acquisiton by Improving Procurement Systems

    SciTech Connect (OSTI)

    2012-08-01

    Case study details the U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant process to improve to its procurement system and its increase sustainable acquisitions.

  13. Sandia National Laboratories: Working with Sandia: Procurement...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contractor's Release Under Contract (MS Word) Affirmative Procurement Report (MS Word) Prop & Direct Change Attachments (MS Word) Posters Equal Employment Opportunity Davis-Bacon...

  14. WPN 10-3: Procurement Toolkit CD

    Broader source: Energy.gov [DOE]

    To issue the Procurement Toolkit CD to all Grantees, to share with their local agencies, for use in the Weatherization Assistance Program.

  15. Sandia National Laboratories: Working with Sandia: Procurement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Working with Sandia Procurement Construction Potential Suppliers Becoming a Supplier to Sandia What Does Sandia Buy? Small Business JCEL photo Current Suppliers Accounts Payable...

  16. Sandia National Laboratories: Working with Sandia: Procurement...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of Electronic Funds Transfer (ETF) payments (MS WORD), completing a paperless cycle. Procurement Notices: Sandia recommends prompt invoicing due to the debt ceiling and federal...

  17. One Procurement Director's Perspective - Patricia Schuneman,...

    Energy Savers [EERE]

    Way" What are you prepared to do? Topics Discussed: Develop Our Employees Encourage Creativity Care for Our Employees PDF icon Workshop 2015 - SchunemanOne Procurement Dir's...

  18. 500 kV Spare Transformer Procurement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Procurement capital project is for the acquisition of five, 500 kV spare transformers, which are to be strategically located throughout the system, and for the...

  19. 25th Anniversary Government Procurement Conference

    Broader source: Energy.gov [DOE]

    The Government Procurement Conference is a national conference fostering business partnerships between the Federal Government, its prime contractors, and small, minority, service-disabled veteran-owned, veteran-owned, HUBZone, and women-owned businesses. Now in its 25th year, the Government Procurement Conference has become the premier event for small businesses throughout the United States. Participating firms will have the benefit of marketing their products/services to procurement representatives and small business specialists from government agencies. Companies may choose to set up an exhibit table to showcase their capabilities or simply come as an attendee. The conference also includes educational conference sessions, procurement matchmaking, and a dynamic exhibitor showcase.

  20. Guidance for Procurement Officials | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Contractor Human Resource Management Benefit Value Study Desk Manual Cost Study Manual Contractor ... NNSA Procurement OFPP Performance-Based Service Acquisition Toolkit Products...

  1. ADMINISTRATIVE RECORDS SCHEDULE 3: PROCUREMENT, SUPPLY, AND GRANT RECORDS |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 3: PROCUREMENT, SUPPLY, AND GRANT RECORDS ADMINISTRATIVE RECORDS SCHEDULE 3: PROCUREMENT, SUPPLY, AND GRANT RECORDS The basic procurement files reflect a considerable range of procedure, from simple, small purchases to complicated prime contractor and subcontractor operation. PDF icon ADMINISTRATIVE RECORDS SCHEDULE 3: PROCUREMENT, SUPPLY, AND GRANT RECORDS More Documents & Publications ADMINISTRATIVE RECORDS: PROCUREMENT, SUPPLY, AND GRANT RECORDS ADMINISTRATIVE

  2. Procurement

    Broader source: Energy.gov [DOE]

    1.  Several of our sub-recipients will be able to take advantage of utility rebates when utilizing EECBG funds to make energy efficiency retrofits in their facilities. The question for DOE is...

  3. Procurement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ecology, Applied Geology & Geochemistry, Hydrology, Field Hydrology & Chemistry, Biotechnology & Etoxicology, Environmental Characterization and Risk Assessment Groups Physical & ...

  4. Procurement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract Documents SolicitationsConstructionCloseoutInvoicingGeneral ProvisionsARRAAll Certificate of Established Catalog or Market Price Contract Pricing Proposal for CPFF and FFP...

  5. Procurement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reports A-133 Financial Statements A-133 Audit Reports FY06 A-133 audit report FY07 A-133 ... FY11 Corrective Action Plan FY12 A-133 audit report A-133 Financial Statements FY08 A-133 ...

  6. Procurement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Forms Activity Specific Electrical Worker Qualification Alternative Means of Isolating Hazardous Energy from Specific Equipment Authorized Worker Lock Removal and/or Reinstallation by Different Authorized Worker Authorized Worker Requirements Checklist for Insulating Rubber Gloves Competent Person Designation Confined Space Entry Construction Supervisor Safety Inspection Checklist Contractor Environment Safety and Health Manual Contractor Nonconformance Report Criteria for Proceeding with Verbal

  7. Evaluation of Cellular Shades in the PNNL Lab Homes (Technical...

    Office of Scientific and Technical Information (OSTI)

    Sponsoring Org: USDOE Country of Publication: United States Language: English Subject: 32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION Hunter; Douglas; Cellular; Shades; HVAC; ...

  8. ADMINISTRATIVE RECORDS: PROCUREMENT, SUPPLY, AND GRANT RECORDS | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy ADMINISTRATIVE RECORDS: PROCUREMENT, SUPPLY, AND GRANT RECORDS ADMINISTRATIVE RECORDS: PROCUREMENT, SUPPLY, AND GRANT RECORDS Procurement and supply records document the acquisition of goods and non-personal services, controlling the volume of stock on hand, reporting procurement needs, and related supply matters which are part of daily procurement operations. PDF icon ADMINISTRATIVE RECORDS: PROCUREMENT, SUPPLY, AND GRANT RECORDS More Documents & Publications ADMINISTRATIVE

  9. Webinar: Procuring Fuel Cells for Stationary Power: A Guide for...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procuring Fuel Cells for Stationary Power: A Guide for Federal Decision Makers Webinar: Procuring Fuel Cells for Stationary Power: A Guide for Federal Decision Makers Download ...

  10. OfficeGovernmentEthicsGuidanceEthicsandProcurementIntegrity.pdf...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    OfficeGovernmentEthicsGuidanceEthicsandProcurementIntegrity.pdf OfficeGovernmentEthicsGuidanceEthicsandProcurementIntegrity.pdf PDF icon OfficeGovernmentEthicsGuidanceEthicsandProc...

  11. Procuring Solar Energy: A Guide for Federal Facility Decision...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procuring Solar Energy: A Guide for Federal Facility Decision Makers, Solar Screening Evaluation Checklist, September 2010 Procuring Solar Energy: A Guide for Federal Facility ...

  12. 2015 Procurement Evaluation and Re-engineering Team (PERT) Schedule...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    15 Procurement Evaluation and Re-engineering Team (PERT) Schedule 2015 Procurement Evaluation and Re-engineering Team (PERT) Schedule PDF icon PERT Schedule 2015.pdf More Documents ...

  13. Procurement Evaluation & Re-Engineering Team (PERT) and Establishment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procurement Evaluation & Re-Engineering Team (PERT) and Establishment of a 5-year Cycle with Corresponding Schedule Procurement Evaluation & Re-Engineering Team (PERT) and ...

  14. MEMORANDUM FOR H FROM: ACTING SENIOR PROCUREMENT EXECUTIVE OFFICE...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    :25, 2016 MEMORANDUM FOR H FROM: ACTING SENIOR PROCUREMENT EXECUTIVE OFFICE OF ACQUISITION MANAGEMENT JOSEPH F. WADDELL SENIOR PROCUREMENT EXECU DEPUTY ASSOCIATE ADMIN RATOR OFFICE ...

  15. TO: Procurement Directors FROM: Director, Contracts and Financial...

    Broader source: Energy.gov (indexed) [DOE]

    April 10, 2012 TO: Procurement Directors FROM: Director, Contracts and Financial Assistance Policy Division Office of Policy Office of Procurement and Assistance Management...

  16. TO: Procurement Directors/Contracting Officers FROM: Director

    Broader source: Energy.gov (indexed) [DOE]

    DATE: May 8, 2012 TO: Procurement DirectorsContracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Procurement and...

  17. TO: Procurement Directors/Contracting Officers FROM: Director

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 DATE: March 6, 2015 TO: Procurement DirectorsContracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Procurement and...

  18. TO: Procurement Directors FROM: Director, Contract and Financial...

    Broader source: Energy.gov (indexed) [DOE]

    May 14, 2012 TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division Office of Policy Office of Procurement and Assistance Management SUBJECT:...

  19. TO: Procurement Directors FROM: Director, Contract and Financial...

    Broader source: Energy.gov (indexed) [DOE]

    May 23, 2012 TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division Office of Policy Office of Procurement and Assistance Management SUBJECT:...

  20. TO: Procurement Directors FROM: Director Contracts and Financial...

    Broader source: Energy.gov (indexed) [DOE]

    07, 2012 TO: Procurement Directors FROM: Director Contracts and Financial Assistance Policy Division Office of Policy Office of Procurement and Assistance Management SUBJECT:...

  1. TO: Procurement Directors/Contracting Officers FROM: Director

    Broader source: Energy.gov (indexed) [DOE]

    May 14, 2012 TO: Procurement DirectorsContracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Procurement and Assistance...

  2. TO: Procurement Directors FROM: Director, Contract and Financial...

    Broader source: Energy.gov (indexed) [DOE]

    DATE: May 14 , 2012 TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division Office of Procurement and Assistance Management SUBJECT:...

  3. TO: Procurement Directors FROM: Director, Contracts and Financial...

    Broader source: Energy.gov (indexed) [DOE]

    April 04, 2012 TO: Procurement Directors FROM: Director, Contracts and Financial Assistance Policy Division Office of Policy Office of Procurement and Assistance Management...

  4. TO: Procurement Directors FROM: Director, Contract and Financial...

    Broader source: Energy.gov (indexed) [DOE]

    DATE: June 7, 2012 TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division Office of Policy Office of Procurement and Assistance Management...

  5. Energy Procurement Information Center (EPiC) - Deb Bouslog, Systems...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Procurement Information Center (EPiC) - Deb Bouslog, Systems Division, OAPM Energy Procurement ... dedicated to provide information to DOE's project management community. ...

  6. Nuclear Procurement Issues Committee NUPIC | Open Energy Information

    Open Energy Info (EERE)

    Procurement Issues Committee NUPIC Jump to: navigation, search Name: Nuclear Procurement Issues Committee (NUPIC) Place: Brownville, Tennessee Zip: 68321 Sector: Services Product:...

  7. QAS 2.3 Procurement 3/15/95

    Broader source: Energy.gov [DOE]

    The objective of this surveillance is to evaluate the effectiveness of the contractor's procurement program. The Facility Representative evaluates the preparation of procurement documents,...

  8. Policy Flash 2013-65 Procurement Evaluation & Re-Engineering...

    Energy Savers [EERE]

    Procurement Evaluation & Re-Engineering Team (PERT) and Establishment of a 5-year Cycle with Corresponding Schedule Policy Flash 2013-65 Procurement Evaluation & Re-Engineering...

  9. Procuring Solar Energy: A Guide for Federal Facility Decision...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procuring Solar Energy: A Guide for Federal Facility Decision Makers, September 2010 Procuring Solar Energy: A Guide for Federal Facility Decision Makers, September 2010 This guide ...

  10. Procuring Solar for Federal Facilities | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procuring Solar Energy: A Guide for Federal Facility Decision Makers provides an overview for federal facility managers and their procurement teams on the process of installing ...

  11. Cyber Security Procurement Language for Control Systems Version...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procurement Language for Control Systems Version 1.8 Cyber Security Procurement Language for Control Systems Version 1.8 Supervisory Control and Data Acquisition (SCADA), Process ...

  12. OfficeGovernmentEthicsGuidanceEthicsandProcurementIntegrity.pdf |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy OfficeGovernmentEthicsGuidanceEthicsandProcurementIntegrity.pdf OfficeGovernmentEthicsGuidanceEthicsandProcurementIntegrity.pdf PDF icon OfficeGovernmentEthicsGuidanceEthicsandProcurementIntegrity.pdf More Documents & Publications POLICY FLASH 2016-04 Procurement Integrity AcqGuide3pt1.doc�

  13. NNSA Procurement Projects Perspective - Bob Raines, Associate Administrator

    Energy Savers [EERE]

    for Acquisition and Project Management, NNSA | Department of Energy Projects Perspective - Bob Raines, Associate Administrator for Acquisition and Project Management, NNSA NNSA Procurement Projects Perspective - Bob Raines, Associate Administrator for Acquisition and Project Management, NNSA PDF icon Workshop 2015 - Raines_NNSA Projects Perspective.pdf More Documents & Publications One Procurement Director's Perspective - Patricia Schuneman, Chicago Procurement Director NNSA Procurement

  14. TO: Procurement Directors FROM: Director, Policy Division

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    POLICY FLASH 2011-55 DATE: March 14, 2011 TO: Procurement Directors FROM: Director, Policy ... Questions concerning this policy flash should be directed to Rose Johnson at 202-287-1552 ...

  15. Recovered materials and the proposed procurement rule

    SciTech Connect (OSTI)

    Bergeson, L.L.

    1994-07-01

    The US Environmental Protection Agency (EPA) proposed a Comprehensive Procurement Guideline'' in April designating items that are or can be made with recovered materials. The Agency is proposing to designate 21 additional items and to amend the building installation guideline to establish recovered materials content levels for fiberglass and increase the levels for rock wool. The Comprehensive Procurement Guideline implements Section 6002(e) of the Resource Conservation and Recovery Act (RCRA), and Section 502 of Executive Order 12873. RCRA Section 6002 requires EPA to designate items that are or can be made with recovered materials and to recommend practices to assist federal procuring agencies with meeting their statutory obligations under RCRA Section 6002. After EPA designates an item, RCRA requires that each procuring agency purchase that designated item composed of the highest percentage of recovered materials practicable.

  16. Photovoltaic Shading Testbed for Module-Level Power Electronics

    SciTech Connect (OSTI)

    Deline, C.; Meydbray, J.; Donovan, M.; Forrest, J.

    2012-05-01

    This document describes a repeatable test procedure that attempts to simulate shading situations, as would be experienced by typical residential rooftop photovoltaic (PV) systems. This type of shading test is particularly useful to evaluate the impact of different power conversion setups, including microinverters, DC power optimizers and string inverters, on overall system performance. The performance results are weighted based on annual estimates of shade to predict annual performance improvement. A trial run of the test procedure was conducted with a side by side comparison of a string inverter with a microinverter, both operating on identical 8kW solar arrays. Considering three different shade weighting conditions, the microinverter was found to increase production by 3.7% under light shading, 7.8% under moderate shading, and 12.3% under heavy shading, relative to the reference string inverter case. Detail is provided in this document to allow duplication of the test method at different test installations and for different power electronics devices.

  17. Procurement and Acquisition | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Acquisition Procurement and Acquisition Doing Business With the U.S. Department of Energy Welcome to the Department of Energy's Acquisition homepage. The Office of Acquisition Management (OAM) is responsible for all contracting, financial assistance and related activities to fulfill the Department's multitude of missions through its business relationships. As the business organization of the Department, OAM develops and supports the policies, procedures and procurement operational elements. OAM

  18. NREL: Technology Deployment - Remote Shading Tool Has Potential to Reduce

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Solar Soft Costs by 17 Cents/Watt Remote Shading Tool Has Potential to Reduce Solar Soft Costs by 17 Cents/Watt Publications Solar Census-Perfecting the Art of Automated, Remote Solar Shading Assessments Sponsors U.S. DOE SunShot Incubator Program Key Partners Solar Census Related Stories Solarize Contact Otto VanGeet, 303-384-7369 A solar heat map of a community from the new remote shading tool software The National Renewable Energy Laboratory (NREL), in partnership with Solar Census, and

  19. Laser Makes New Shade of Ultraviolet (COSMIC Log on MSNBC.com...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    cosmiclog.nbcnews.comnews201012285725603-laser-makes-new-shade-of-ultraviolet Submitted: Wednesday, December 29...

  20. Evaluation of the Aurora Application Shade Measurement Accuracy

    SciTech Connect (OSTI)

    2015-12-01

    Aurora is an integrated, Web-based application that helps solar installers perform sales, engineering design, and financial analysis. One of Aurora's key features is its high-resolution remote shading analysis.

  1. NREL Simulates Shade Conditions in Repeatable Test for Solar Arrays - News

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Releases | NREL Simulates Shade Conditions in Repeatable Test for Solar Arrays New protocol finds microinverters can improve performance under shaded conditions more than 12% May 14, 2012 The US Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) has released a new repeatable test protocol that simulates real shade conditions and can predict with much greater precision the effects of shade on a solar array. The new test demonstrated that under heavy shading conditions

  2. Simplified Method for Modeling the Impact of Arbitrary Partial Shading Conditions on PV Array Performance: Preprint

    SciTech Connect (OSTI)

    MacAlpine, Sara; Deline, Chris

    2015-09-15

    It is often difficult to model the effects of partial shading conditions on PV array performance, as shade losses are nonlinear and depend heavily on a system's particular configuration. This work describes and implements a simple method for modeling shade loss: a database of shade impact results (loss percentages), generated using a validated, detailed simulation tool and encompassing a wide variety of shading scenarios. The database is intended to predict shading losses in crystalline silicon PV arrays and is accessed using basic inputs generally available in any PV simulation tool. Performance predictions using the database are within 1-2% of measured data for several partially shaded PV systems, and within 1% of those predicted by the full, detailed simulation tool on an annual basis. The shade loss database shows potential to considerably improve performance prediction for partially shaded PV systems.

  3. Products, services procured by LANL in FY11

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    procured by LANL in FY11 LANL purchased 918M in goods and services. July 16, 2012 Products, services procured by LANL in FY11 LANL purchased 918M in goods and services....

  4. Procurement-Related Forms | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Forms Procurement-Related Forms The following procurement-related forms are provided in PDF fillable andor Word format. Click the link in the "Format" column to open a copy of...

  5. PPL-Procurement's blog | OpenEI Community

    Open Energy Info (EERE)

    picture Submitted by PPL-Procurement(5) Member 27 August, 2015 - 11:11 PPL Electric Alternative Energy Credit RFP PPL Electric RFP is seeking to procure over 200,000 Tier II...

  6. Federal Procurement of Energy-Efficient Products January 2013 Update

    Broader source: Energy.gov [DOE]

    Welcome to the seventh issue of Federal Energy-Efficient Product Procurement! This bi-monthly update helps Federal procurement officials, facility managers, and others remain up to date on events, training, technology, and changes to acquisition requirements.

  7. Energy-Efficient Product Procurement for Federal Agencies (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2011-08-01

    Overview of the U.S. Department of Energy Federal Energy Management Program Energy-Efficient Product Procurement Program.

  8. 2015 Procurement Evaluation and Re-engineering Team (PERT) Schedule |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 15 Procurement Evaluation and Re-engineering Team (PERT) Schedule 2015 Procurement Evaluation and Re-engineering Team (PERT) Schedule PDF icon PERT Schedule 2015.pdf More Documents & Publications Change to Procurement Evaluation & Re-Engineering Team (PERT) Review Cycle Procurement Evaluation & Re-Engineering Team (PERT) and Establishment of a 5-year Cycle with Corresponding Schedule POLICY FLASH 2015-40

  9. Procurement IT Tools - John Makepeace, Systems Division, OAPM | Department

    Energy Savers [EERE]

    of Energy Procurement IT Tools - John Makepeace, Systems Division, OAPM Procurement IT Tools - John Makepeace, Systems Division, OAPM Topics Discussed: Procurement Systems at the Department of Energy Improving Systems & Processes M&O Subcontract Reporting Capability (MOSRC) Enhancing Reporting Capabilities Promoting Data Quality More... PDF icon Workshop 2015 - Makepeace_Procurement IT Tools.pdf More Documents & Publications Acquisition Letters No. AL 2015-08 POLICY FLASH 2015-35

  10. PIA - Savannah River Nuclear Solution (SRNS) Procurement Cycle System (PCS)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Procurement Cycle System (PCS) PIA - Savannah River Nuclear Solution (SRNS) Procurement Cycle System (PCS) PIA - Savannah River Nuclear Solution (SRNS) Procurement Cycle System (PCS) PDF icon PIA - Savannah River Nuclear Solution (SRNS) Procurement Cycle System (PCS) More Documents & Publications PIA - Savannah River Nuclear Solutions (SRNS) Human Resource Management System (HRMS) PIA - Savannah River Nuclear Solution (SRNS) MedGate Occupational Health and Safety

  11. Procuring Solar for Federal Facilities | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procuring Solar for Federal Facilities Procuring Solar for Federal Facilities Procuring Solar Energy: A Guide for Federal Facility Decision Makers is a Web guide for federal site managers, site contractors, and procurement specialists to help them navigate the process towards a successful solar installation by providing step-by-step information, case studies, and additional resources. Because solar systems produce energy on site, they involve unique issues and processes. They include connecting

  12. Enabling Sustainable Acquisition by Improving Procurement Systems

    Broader source: Energy.gov [DOE]

    Fact sheet describes a case study of the Department of Energy Waste Pilot Plant (WIPP) enabling a sustainable acquisition by improving the procurement systems. The periodic review of the Environmental Management System (EMS) sub-systems is necessary to ensure that desired progress towards environmental objectives is being achieved.

  13. TO: Procurement Directors Heads of Contracting Activities

    Energy Savers [EERE]

    3 DATE: February 04, 2016 TO: Procurement Directors Heads of Contracting Activities FROM: Acting Chief Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition Management SUBJECT: New Policy Flash Distribution Process SUMMARY: This office is automating the policy flash (PF) distribution process by using a listserv. As of February 18, 2016, the listserv will send PF notifications without attachments. PFs will no longer be sent via the email distribution list. PFs

  14. TO: Procurement Directors Heads of Contracting Activities

    Energy Savers [EERE]

    7 DATE: March 16, 2016 TO: Procurement Directors Heads of Contracting Activities FROM: Acting Chief Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition Management SUBJECT: Acquisition Letters Remaining in Effect SUMMARY: Acquisition letter 2016-04 has been issued. It lists ALs currently in effect and discontinued ALs, along with the reason why the AL is no longer in effect. This flash will be available online at the following website:

  15. TO: Procurement Directors Heads of Contracting Activities

    Energy Savers [EERE]

    1 DATE: January 15, 2016 TO: Procurement Directors Heads of Contracting Activities FROM: Chief Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition Management SUBJECT: Streamlining DOE's Oversight of Compensation and Benefits SUMMARY: The purpose of Acquisition Letter (AL) 2016-01 is to provide guidance regarding required actions to move from DOE traditional transactional approach for approving certain costs relating to compensation and benefits, to a risk

  16. TO: Procurement Directors Heads of Contracting Activities

    Energy Savers [EERE]

    2 DATE: February 2, 2016 TO: Procurement Directors Heads of Contracting Activities FROM: Chief Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition Management SUBJECT: Clarifying Guidance for Audits of "For-Profit" Financial Assistance Awards SUMMARY: The purpose of this policy flash is to provide clarifying guidance relating to certain provisions set forth in DOE Regulation 2 CFR 910.515. The clarifying guidance is as follows: * DOE Regulation 2 CFR

  17. TO: Procurement Directors Heads of Contracting Activities

    Energy Savers [EERE]

    6 DATE: March 15, 2016 TO: Procurement Directors Heads of Contracting Activities FROM: Acting Chief Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition Management SUBJECT: Clarifying Guidance for Audits of "For-Profit" Financial Assistance Awards SUMMARY: The purpose of this policy flash is to provide clarifying guidance relating to the requirement of rendering an opinion on the Schedule of Expenditures as set forth in DOE Regulation 2 CFR 910.514.

  18. TO: Procurement Directors/Contracting Officers

    Energy Savers [EERE]

    POLICY FLASH 2016-14 DATE: February 17, 2016 TO: Procurement Directors/Contracting Officers ~- ~ ~ \N \ .___.; FROM: Acting Chief Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition Management SUBJECT: Acquisition Letter 2016-02/Financial Acquisition Letter 2016-01 Congressional Notifications and Quarterly Reporting to the Appropriations Committees in Accordance with the Energy and Water Development and Related Agencies Appropriations Act, 2016, Division D,

  19. Acquisition Guide Chapters 4.1- Procurement and Assistance Data System (PADS) and 4.3- Requirements for the Industry Interactive Procurement System (IIPS)

    Broader source: Energy.gov [DOE]

    With the implementation of Strategic Integrated Procurement Enterprise System (STRIPES), Acquisition Guide Chapters 4.1 - Procurement and Assistance Data System (PADS) and 4.3 - Requirements for the Industry Interactive Procurement System (IIPS) are hereby rescinded.

  20. Contacts for the Assistant General Counsel for Procurement and Financial

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assistance | Department of Energy Procurement and Financial Assistance Contacts for the Assistant General Counsel for Procurement and Financial Assistance Joseph A. Lenhard, Assistant General Counsel for Procurement & Financial Assistance 202-586-0321 joseph.lenhard@hq.doe.gov Source Selection/Bid Protests 202-586-6902 202-586-4546 (fax) Laura L. Hoffman, Deputy Assistant General Counsel 202-586-8836 laura.hoffman@hq.doe.gov Kevin R. Hilferty, Attorney-Adviser 202-586-8260

  1. High-Efficiency Rooftop Air Conditioners: Innovative Procurement to Achieve

    Office of Scientific and Technical Information (OSTI)

    Advances in Technology (Journal Article) | SciTech Connect Journal Article: High-Efficiency Rooftop Air Conditioners: Innovative Procurement to Achieve Advances in Technology Citation Details In-Document Search Title: High-Efficiency Rooftop Air Conditioners: Innovative Procurement to Achieve Advances in Technology The U.S. Department of Energy, Defense Logistics Agency, and Pacific Northwest National Laboratory recently conducted a technology procurement to increase the availability of

  2. Historical Procurement Information - by Location | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Historical Procurement Information - by Location Historical Procurement Information - by Location Small business contracing is difficult to navigate. We've built the Small Business Opportunities Tool to identify historical records of what the Department of Energy has purchased, which you can use to identify likely future opportunities. Use the downloads below to view historical procurement by state. PDF icon California.pdf PDF icon Colorado.pdf PDF icon DistrictColumbia.pdf PDF icon Georgia.pdf

  3. Seven Years Since SERP: Successes and Setbacks in Technology Procurement

    Office of Scientific and Technical Information (OSTI)

    (Conference) | SciTech Connect Conference: Seven Years Since SERP: Successes and Setbacks in Technology Procurement Citation Details In-Document Search Title: Seven Years Since SERP: Successes and Setbacks in Technology Procurement This paper describes lessons learned from 4 completed and 2 ongoing technology procurement projects PNNL has conducted for DOE's Emerging Technology program. The past seven years have seen a variety of projects designed to aggregate markets for highly efficient

  4. Office of Headquarters Procurement Services - Employee Customer Service

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Standards | Department of Energy Office of Headquarters Procurement Services - Employee Customer Service Standards Office of Headquarters Procurement Services - Employee Customer Service Standards CUSTOMER FOCUS The Office of Headquarters Procurement Services (MA-64) serves a variety of customers in the performance of its acquisition and financial assistance mission. Primary among its many customers is each of the Department of Energy Headquarters program offices. MA-64 continually seeks to

  5. Office of the Assistant General Counsel for Procurement and Financial

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assistance | Department of Energy Services » Transactions, Technology and Contractor Human Resources » Office of the Assistant General Counsel for Procurement and Financial Assistance Office of the Assistant General Counsel for Procurement and Financial Assistance The Office of the Assistant General Counsel for Procurement and Financial Assistance provides legal support and advice regarding the Department's massive contractual expenditures and financial assistance policy and activities.

  6. Procuring Solar Energy: A Guide for Federal Facility Decision Makers,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    September 2010 | Department of Energy Procuring Solar Energy: A Guide for Federal Facility Decision Makers, September 2010 Procuring Solar Energy: A Guide for Federal Facility Decision Makers, September 2010 This guide presents an overview of the process for successfully planning for and installing solar technology on a federal site. It is specifically targeted to managers of federal buildings and sites, contracting officers, energy and sustainability officers, and regional procurement

  7. Process for Procuring a Federal Energy Savings Performance Contract |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Process for Procuring a Federal Energy Savings Performance Contract Process for Procuring a Federal Energy Savings Performance Contract The Federal Energy Management Program (FEMP) helps agencies implement energy savings performance contract (ESPC) projects. FEMP's process for procuring an ESPC comprises five phases: Phase 1: Acquisition Planning Phase 2: Energy Service Company Selection and Preliminary Assessment Phase 3: Project Development Phase 4: Project

  8. TO: Procurement Directors/Contracting Officers FROM: Director

    Office of Environmental Management (EM)

    65 DATE: July 03, 2013 TO: Procurement Directors/Contracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Procurement Evaluation & Re-Engineering Team (PERT) and Establishment of a 5-year Cycle with Corresponding Schedule SUMMARY: The Senior Procurement Executive has issued guidance (attached) that endorses the PERT program, establishes the 5-year cycle and PERT review schedule from FY 2014 to

  9. USASpending.gov to STARS Reconciliation Initiative (and Procurement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the Procurement Insight Center (PIC) * 20+ types of standard reports in IDW ... - Make pre-award data available in the PIC (for authorized users) - More complete and ...

  10. Sandia National Laboratories Procurement Organization annual report, fiscal year 1994

    SciTech Connect (OSTI)

    Stimak, D.R.

    1995-03-01

    This report summarizes the purchasing and transportation activities of the Procurement Organization for FY 1994. Activities for both the New Mexico and California locations are included.

  11. IT Industry's Renewable Energy Procurement is Significant, Set...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    IT Industry's Renewable Energy Procurement is Significant, Set to Climb August 20, 2015 The percentage of renewable electricity purchased by U.S. companies in the information and ...

  12. Y-12 recognized for outstanding procurement stewardship | National...

    National Nuclear Security Administration (NNSA)

    NNSA presented Y-12 Procurement Operations with the award for attaining the Highest Total Strategic Savings Rate among NNSA's seven management and operating contractors. Y-12...

  13. Procuring Energy-Efficient Products (Fact Sheet) (Revised)

    SciTech Connect (OSTI)

    Not Available

    2012-08-01

    Overview of the U.S. Department of Energy Federal Energy Management Program Energy-Efficient Product Procurement Program and its designated product category list.

  14. Procuring and Implementing Solar Projects on Public Buildings...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procuring and Implementing Solar Projects on Public Buildings: How to Avoid Common Pitfalls This webinar covered good practices for photovoltaic and solar water heating request for ...

  15. Office of the Assistant General Counsel for Procurement and Financial...

    Broader source: Energy.gov (indexed) [DOE]

    contractual expenditures and financial assistance policy and activities. The office reviews and provides advice and assistance in the development of DOE procurement,...

  16. TO: Procurement Directors FROM: Director Contract and Financial...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8 DATE: February 26, 2014 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management...

  17. TO: Procurement Directors/Contracting Officers FROM: Director

    Broader source: Energy.gov (indexed) [DOE]

    October 30 , 2013 TO: Procurement DirectorsContracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project...

  18. TO: Procurement Directors/Contracting Officers FROM: Director

    Broader source: Energy.gov (indexed) [DOE]

    January 15, 2014 TO: Procurement DirectorsContracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project...

  19. TO: Procurement Directors FROM: Director Contract and Financial...

    Office of Environmental Management (EM)

    2 DATE: March 18, 2014 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management...

  20. TO: Procurement Directors FROM: Director, Contract and Financial...

    Broader source: Energy.gov (indexed) [DOE]

    58 DATE: June 5, 2013 TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management...

  1. TO: Procurement Directors FROM: Director, Contract and Financial...

    Broader source: Energy.gov (indexed) [DOE]

    18, 2012 TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT:...

  2. TO: Procurement Directors/Contracting Officers FROM: Director

    Broader source: Energy.gov (indexed) [DOE]

    6, 2014 TO: Procurement DirectorsContracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project...

  3. TO: Procurement Directors/Contracting Officers FROM: Director

    Broader source: Energy.gov (indexed) [DOE]

    November 21, 2012 TO: Procurement DirectorsContracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project...

  4. TO: Procurement Directors FROM: Director Contract and Financial...

    Broader source: Energy.gov (indexed) [DOE]

    2, 2012 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Executive...

  5. TO: Procurement Directors/Contracting Officers FROM: Director

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    28 DATE: May 7, 2014 TO: Procurement DirectorsContracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and...

  6. TO: Procurement Directors FROM: Director Contract and Financial...

    Broader source: Energy.gov (indexed) [DOE]

    November 07, 2012 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT:...

  7. TO: Procurement Directors FROM: Director, Contract and Financial...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 DATE: October 21, 2014 TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management...

  8. TO: Procurement Directors FROM: Director, Contract and Financial...

    Broader source: Energy.gov (indexed) [DOE]

    DATE: November 13, 2012 TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division Office of Acquisition and Project Management SUBJECT: Hurricane...

  9. TO: Procurement Directors FROM: Director Contract and Financial...

    Broader source: Energy.gov (indexed) [DOE]

    2, 2012 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Class...

  10. TO: Procurement Directors FROM: Director Contracts and Financial...

    Broader source: Energy.gov (indexed) [DOE]

    June 21, 2012 TO: Procurement Directors FROM: Director Contracts and Financial Assistance Policy Division Office of Acquisition and Project Management SUBJECT: Department of Energy...

  11. TO: Procurement Directors FROM: Director Contract and Financial...

    Broader source: Energy.gov (indexed) [DOE]

    December 7, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT:...

  12. TO: Procurement Directors FROM: Director Contract and Financial...

    Broader source: Energy.gov (indexed) [DOE]

    , 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Updated...

  13. TO: Procurement Directors/Contracting Officers FROM: Director

    Broader source: Energy.gov (indexed) [DOE]

    1, 2014 TO: Procurement DirectorsContracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project...

  14. TO: Procurement Directors FROM: Director Contract and Financial...

    Broader source: Energy.gov (indexed) [DOE]

    Assistance Policy Division Office of Policy Office of Procurement and Assistance Management SUBJECT: Acquisition Guide Chapter 4.6 - Assigning Identifying Numbers Outside...

  15. Procuring Fuel Cells for Stationary Power: A Guide for Federal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Decision Makers Procuring Fuel Cells for Stationary Power: A Guide for Federal Decision Makers Download presentation slides from the May 8, 2012, Fuel Cell Technologies Program ...

  16. High-Efficiency Rooftop Air Conditioners: Innovative Procurement...

    Office of Scientific and Technical Information (OSTI)

    Advances in Technology Citation Details In-Document Search Title: High-Efficiency Rooftop Air Conditioners: Innovative Procurement to Achieve Advances in Technology The U.S. ...

  17. TO: Procurement Directors FROM: Director Contract and Financial...

    Energy Savers [EERE]

    10 DATE: November 26 , 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management...

  18. TO: Procurement Directors FROM: Director Contract and Financial...

    Broader source: Energy.gov (indexed) [DOE]

    DATE: November 26 , 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management...

  19. Annual report procurement organization Sandia National Laboratories fiscal year 1996

    SciTech Connect (OSTI)

    Palmer, D.L.

    1997-04-01

    This report summarizes the purchasing and transportation activities of the Procurement Organization for Fiscal Year 1996, Activities for both the New Mexico and California locations are included.

  20. Whole Building Performance-Based Procurement Training | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Whole Building Performance-Based Procurement Training Commercial Buildings Integration Project for the 2013 Building Technologies Office's Program Peer Review PDF icon...

  1. Procuring Solar Energy: A Guide for Federal Facility Decision...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Solar Screening Evaluation Checklist, September 2010 Procuring Solar Energy: A Guide for Federal Facility Decision Makers, Solar Screening Evaluation Checklist, September 2010 This ...

  2. Procuring Solar Energy: A Guide for Federal Facility Decision...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Appendix B, September 2010 Procuring Solar Energy: A Guide for Federal Facility Decision Makers, Appendix B, September 2010 This guide presents an overview of the process for ...

  3. Procuring Fuel Cells for Stationary Power: A Guide for Federal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procuring Fuel Cells for Stationary Power: A Guide for Federal Facility Decision Makers Federal Facilities Guide to Fuel Cells May 8, 2012 - Outline * Distributed Generation and ...

  4. Stopping Illicit Procurement: Lessons from Global Finance

    SciTech Connect (OSTI)

    Hund, Gretchen; Kurzrok, Andrew J.

    2014-06-19

    Government regulators and the financial sector cooperate to combat money laundering and terrorist financing. This information-sharing relationship is built upon a strong legislative foundation and effective operational procedures. As with money-laundering and terrorist financing, halting the illicit procurement of dual-use commodities requires close coordination between government and industry. However, many of the legal and operational features present in financial threat cooperation do not exist in the export control realm. This article analyzes the applicability of financial industry cooperative measures to nonproliferation.

  5. ENG-Canada-USA Government Procurement (clean 11 Feb 2010 printed...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ENG-Canada-USA Government Procurement (clean 11 Feb 2010 printed) ENG-Canada-USA Government Procurement (clean 11 Feb 2010 printed) PDF icon ENG-Canada-USA Government Procurement ...

  6. Chronological History of Federal Energy-Efficient Product Procurement:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Executive, Legislative and Regulatory Requirements, Actions and Mandates | Department of Energy Chronological History of Federal Energy-Efficient Product Procurement: Executive, Legislative and Regulatory Requirements, Actions and Mandates Chronological History of Federal Energy-Efficient Product Procurement: Executive, Legislative and Regulatory Requirements, Actions and Mandates Document provides a chronological history of the legislative actions and executive orders that contribute to the

  7. Whole Building Performance-Based Procurement Training | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Performance-Based Procurement Training Whole Building Performance-Based Procurement Training Commercial Buildings Integration Project for the 2013 Building Technologies Office's Program Peer Review PDF icon commlbldgs12_pless_040413.pdf More Documents & Publications Best Practices for Controlling Capital Costs in Net Zero Energy Design and Construction - 2014 BTO Peer Review Solar Decathlon Building America System Research

  8. Procuring Architectural and Engineering Services for Energy Efficiency and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sustainability | Department of Energy Procuring Architectural and Engineering Services for Energy Efficiency and Sustainability Procuring Architectural and Engineering Services for Energy Efficiency and Sustainability PDF icon 51367_resguidefedconsmgr.pdf More Documents & Publications Audit Report: IG-0387 Chapter 2: Whole-Buildling Design Guide to Integrating Renewable Energy in Federal Construction

  9. POLICY FLASH 2014-25 Revision to the Procurement Strategy Panel...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    POLICY FLASH 2014-25 Revision to the Procurement Strategy Panel (PSP) Briefing Process POLICY FLASH 2014-25 Revision to the Procurement Strategy Panel (PSP) Briefing Process ...

  10. PPPL_Procurement_map_NJ_FY15

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 Princeton Plasma Physics Laboratory Procured Materials and Services 2015 ($10.8M) # small business/ total firms 23.1k 27.2k 2 1 2 3 4 12 6 7 Hunterdon Somerset Middlesex Morris Warren Sussex Passaic Bergen Essex Hudson Union Monmouth Mercer Ocean Burlington Atlantic Camden Salem Gloucester Cumberland Cape May 5 11 9 52.4k 576k 1 426k 192k 394k 1.05M 4 1.63M 1.45M 1.69M 3 3.28M 2 / 2 1 / 1 1 / 3 10 / 11 18 / 20 4 / 4 7 / 9 24 / 25 6 / 8 18 / 20 7 / 8 28 / 32 10 8 5 9 6 11 7 12 District $

  11. Highly insulating Residential Windows Using Smart Automated Shading

    Energy Savers [EERE]

    Department of Energy High Efficiency Particulate Air (HEPA) Filter Test Facility (FTF) High Efficiency Particulate Air (HEPA) Filter Test Facility (FTF) DOE-STD-3020-2015 Specification for HEPA Filters Used by DOE Contractors The purpose of this standard is to establish specifications and quality assurance (QA) requirements for the procurement, packaging, shipping and storage of high efficiency particulate air (HEPA) filters. DOE-STD-3025-2007 Quality Assurance Inspection and Testing of HEPA

  12. Partially Shaded Operation of a Grid-Tied PV System: Preprint

    SciTech Connect (OSTI)

    Deline, C.

    2009-06-01

    This paper presents background and experimental results from a single-string grid-tied PV system, operated under a variety of shading conditions.

  13. Shades of Perfection in Perfect Liquids | U.S. DOE Office of...

    Office of Science (SC) Website

    Shades of Perfection in Perfect Liquids Nuclear Physics (NP) NP Home About Research Facilities Science Highlights Benefits of NP Funding Opportunities Nuclear Science Advisory ...

  14. Partial Shade Evaluation of Distributed Power Electronics for Photovoltaic Systems: Preprint

    SciTech Connect (OSTI)

    Deline, C.; Meydbrav, J.; Donovan, M.

    2012-06-01

    Site survey data for several residential installations are provided, showing the extent and frequency of shade throughout the year. This background information is used to design a representative shading test that is conducted on two side-by-side 8-kW photovoltaic (PV) installations. One system is equipped with a standard string inverter, while the other is equipped with microinverters on each solar panel. Partial shade is applied to both systems in a comprehensive range of shading conditions, simulating one of three shade extents. Under light shading conditions, the microinverter system produced the equivalent of 4% annual performance improvement, relative to the string inverter system. Under moderate shading conditions, the microinverter system outperformed the string inverter system by 8%, and under heavy shading the microinverter increased relative performance by 12%. In all three cases, the percentage of performance loss that is recovered by the use of distributed power electronics is 40%-50%. Additionally, it was found that certain shading conditions can lead to additional losses in string inverters due to peak-power tracking errors and voltage limitations.

  15. Highly insulating Residential Windows Using Smart Automated Shading

    Energy Savers [EERE]

    Highly insulating Residential Windows Using Smart Automated Shading 2015 Building Technologies Office Peer Review Robert Hart, rghart@lbl.gov Stephen Selkowitz, seselkowitz@lbl.gov Lawrence Berkeley National Laboratory Kevin Gaul, GaulKJ@pella.com Pella Corporation Project Summary Timeline: Start date: 04/01/2013 Planned end date: 03/31/2016 Key Milestones 1. Measured thermal performance of static prototype windows is within 0.03 Btu/hr-ft2F (NFRC tolerance) of design specifications 09/30/2014

  16. Policy Flash 2014-06 Affirmative procurement of biobased products...

    Office of Environmental Management (EM)

    contracts (FAR clause 52.223-2) Policy Flash 2014-06 Affirmative procurement of biobased products under service and construction contracts (FAR clause 52.223-2) Questions...

  17. CelebrAsian 30th Annual Procurement Conference

    Broader source: Energy.gov [DOE]

    On June 3-5, 2015, the US Pan Asian American Chamber of Commerce (USPAACC) will celebrate its 30th birthday through the annual CelebrAsian Procurement Conference

  18. TO: Procurement Directors Head of Contracting Activities FROM...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Business goals. GSA touts these contracts as easy to use and as providing maximum flexibility at the task order level. They are available for use by DOE Federal Procurement...

  19. Photovoltaic procurement strategies: an assessment of supply issues

    SciTech Connect (OSTI)

    Posner, D.; Costello, D.

    1980-02-01

    This review report presents the results of an analysis of alternative approaches to the design of a federal photovoltaics procurement program. Advantages and disadvantages of large purchases at fixed prices and smaller purchases for testing and demonstrating the technology are presented. The objectives and possible impacts of these purchase programs on the photovoltaic industry are described. The reactions of the industry to alternative purchase programs were assessed using personal interviews with selected companies currently active in photovoltaics. The report begins with a review of the impacts of federal procurements on other innovations, including the electronics industry, and suggests the relation of these procurements to photovoltaics. The methodology for conducting the interviews is presented next. The results of the interviews are summarized into possible scenarios of future developments in the industry and into discussions of key issues in the design of a procurement program. An appendix on the current structure of the photovoltaic industry is provided.

  20. Subscribe to Energy-Efficient Product Procurement Updates

    Broader source: Energy.gov [DOE]

    FEMP offers e-mail updates covering energy-efficient product procurement requirements, guidance, and assistance. Enter your e-mail address below to begin the registration process. After you...

  1. Revision to the Procurement Strategy Panel (PSP) Briefing Process

    Broader source: Energy.gov [DOE]

    This flash and the attached Acquisition Guide 7.1 revises the PSP process, which is an alternate to a written acquisition plan for procurements expected to exceed $100M.

  2. Procuring Fuel Cells for Stationary Power: A Guide for Federal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procuring Fuel Cells for Stationary Power: A Guide for Federal Facility Decision Makers This step-by-step manual guides readers through the process of implementing a fuel cell ...

  3. Cybersecurity Procurement Language for Energy Delivery (April 2014) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Procurement Language for Energy Delivery (April 2014) Cybersecurity Procurement Language for Energy Delivery (April 2014) Energy delivery systems, which are used to monitor and control the production, transfer, and distribution of energy, are critical to the effective and reliable operation of North America's energy infrastructure. Our twenty-first-century way of life is made possible by the vast network of processes enabled by these systems, as well as the

  4. DOE Head of Contracting Activity and Procurement Directors' Directory -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sept 25 2015 | Department of Energy Head of Contracting Activity and Procurement Directors' Directory - Sept 25 2015 DOE Head of Contracting Activity and Procurement Directors' Directory - Sept 25 2015 File HCA and PD List Sept 25 2015.xlsx PDF icon Other DOE HCA List May 26 2015.pdf More Documents & Publications Chapter 1 - Acquisition Regulations System DOE Site Facility Management Contracts Internet Posting High Risk Plan

  5. Letter: Restructuring & Managing of the Procurement Mechanisms Supporting

    Office of Environmental Management (EM)

    Activities of the Environmental Management SSABs | Department of Energy Restructuring & Managing of the Procurement Mechanisms Supporting Activities of the Environmental Management SSABs Letter: Restructuring & Managing of the Procurement Mechanisms Supporting Activities of the Environmental Management SSABs From: Assistant Secretary, Jessie H. Roberson (EM-1) To: The Honorable J. Gresham Barrett U.S. House of Representatives This letter is in response to an August 8, 2003 letter

  6. TO: Procurement Directors/Contracting Officers FROM: Director

    Office of Environmental Management (EM)

    POLICY FLASH 2014-34 DATE: July 7, 2014 TO: Procurement Directors/Contracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Procurement and Assistance Management SUBJECT: DOE Order 484.1, Reimbursable Work for the Department of Homeland Security Change SUMMARY: The purpose of this Flash is to inform contracting personnel that the department issued an administrative change to DOE Order 484.1, Reimbursable Work for the Department of Homeland

  7. Monitoring and evaluation of green public procurement programs

    SciTech Connect (OSTI)

    Adell, Aure; Schaefer, Bettina; Ravi, Kavita; Corry, Jenny

    2013-10-15

    Effective procurement policies can help governments save considerable amounts of money while also reducing energy consumption. Additionally, private sector companies which purchase large numbers of energy-consuming devices can benefit from procurement policies that minimize life-cycle energy costs. Both public and private procurement programs offer opportunities to generate market-transforming demand for energy efficient appliances and lighting fixtures. In recent years, several governments have implemented policies to procure energy efficient products and services. When deploying these policies, efforts have focused on developing resources for implementation (guidelines, energy efficiency specifications for tenders, life cycle costing tools, training, etc.) rather than defining monitoring systems to track progress against the set objectives. Implementation resources are necessary to make effective policies; however, developing Monitoring and Evaluation (M and E) mechanisms are critical to ensure that the policies are effective. The purpose of this article is to provide policy makers and procurement officials with a preliminary map of existing approaches and key components to monitor Energy Efficient Procurement (EEP) programs in order to contribute to the improvement of their own systems. Case studies are used throughout the paper to illustrate promising approaches to improve the M and E of EEP programs, from the definition of the system or data collection to complementary instruments to improve both the monitoring response and program results.

  8. Potential energy savings with exterior shades in large office buildings and the impact of discomfort glare

    SciTech Connect (OSTI)

    Hoffmann, Sabine; Lee, Eleanor

    2015-04-01

    Exterior shades are highly efficient for reducing solar load in commercial buildings. Their impact on net energy use depends on the annual energy balance of heating, cooling, fan and lighting energy. This paper discusses the overall energy use intensity of various external shading systems for a prototypical large office building split into the different types of energy use and for different orientations and window sizes. Lighting energy was calculated for a constant lighting power as well as for dimmed lighting fixtures (daylighting control). In Section 3, slat angles and solar cut-off angles were varied for fixed exterior slat shading systems. While the most light-blocking shades performed best for the case without daylighting controls, the optimum cut-off angle with daylighting controls was found to be 30 deg for the office building prototype used in Chicago and Houston. For large window-to-wall (WWR) ratios, window related annual energy use could be reduced by at least 70 % without daylighting control and by a minimum of 86 % with daylighting control in average over all orientations. The occurrence of discomfort glare was is considered in Section 4 of the paper, which looks at the performance of commercially available exterior shading systems when an interior shade is used in addition to the exterior shade during hours when occupants would experience discomfort glare. Glare control impacts overall energy use intensity significantly for exterior shades with high transmittance, especially when daylighting controls are used. In these cases, exterior shades are only beneficial for window-to-wall areas ≥ 45% in the hot Houston climate. For smaller windows and in a heating/cooling climate like Chicago, exterior shades can increase energy consumption

  9. Change to Procurement Evaluation & Re-Engineering Team (PERT) Review Cycle

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Change to Procurement Evaluation & Re-Engineering Team (PERT) Review Cycle Change to Procurement Evaluation & Re-Engineering Team (PERT) Review Cycle The Senior Procurement Executive has issued guidance that revises the PERT Review Cycle requirement from every three years to every five years. PDF icon PF2013-21 Change to Procurement Evaluation & Re-Engineering Team (PERT) Review Cycle PDF icon PF2013-21a.pdf More Documents & Publications Procurement

  10. Solar Heat Gain Through Fenestration Systems Containing Shading: Procedures for Estimating Performance from Minimal Data

    SciTech Connect (OSTI)

    Klems, J.H.

    2000-08-01

    The computational methods for calculating the properties of glazing systems containing shading from the properties of their components have been developed, but the measurement standards and property data bases necessary to apply them have not. It is shown that with a drastic simplifying assumption these methods can be used to calculate system solar-optical properties and solar heat gain coefficients for arbitrary glazing systems, while requiring limited data about the shading. Detailed formulas are presented, and performance multipliers are defined for the approximate treatment of simple glazings with shading. As higher accuracy is demanded, the formulas become very complicated.

  11. PVUSA procurement, acceptance, and rating practices for photovoltaic power plants

    SciTech Connect (OSTI)

    Dows, R.N.; Gough, E.J.

    1995-09-01

    This report is one in a series of PVUSA reports on PVUSA experiences and lessons learned at the demonstration sites in Davis and Kerman, California, and from participating utility host sites. During the course of approximately 7 years (1988--1994), 10 PV systems have been installed ranging from 20 kW to 500 kW. Six 20-kW emerging module technology arrays, five on universal project-provided structures and one turnkey concentrator, and four turnkey utility-scale systems (200 to 500 kW) were installed. PVUSA took a very proactive approach in the procurement of these systems. In the absence of established procurement documents, the project team developed a comprehensive set of technical and commercial documents. These have been updated with each successive procurement. Working closely with vendors after the award in a two-way exchange provided designs better suited for utility applications. This report discusses the PVUSA procurement process through testing and acceptance, and rating of PV turnkey systems. Special emphasis is placed on the acceptance testing and rating methodology which completes the procurement process by verifying that PV systems meet contract requirements. Lessons learned and recommendations are provided based on PVUSA experience.

  12. Simulator procurement guidelines for fossil power plants: Final report

    SciTech Connect (OSTI)

    Lewis-Clapper, R.C.; Colby, F.J.; Gaddy, C.D.; Stone, H.P. II

    1994-12-01

    EPRI compact simulators are more effective, more flexible, and less expensive than conventional simulators. As a result, these simulators can benefit utilities in many ways, ranging from improving heat rate and decreasing O and M costs to reducing control system retrofit costs. Similarly, simulator applications range from operator training to engineering analyses and new product testing. These guidelines help utilities efficiently develop simulator specifications and procure these simulators. The guidelines cover the three phases of the procurement process: (1) pre-specification, (2) specification development, and (3) post-specification. For each phase, the guidelines include specific steps to take and use examples to point out how to avoid problems. Guideline appendices include a generic simulator specification. To help transfer the information in the guidelines to the industry, EPRI has also developed a simulator procurement workshop and a six-hour videotape series based on the workshop.

  13. Partial Shade Stress Test for Thin-Film Photovoltaic Modules: Preprint

    SciTech Connect (OSTI)

    Silverman, Timothy J.; Deceglie, Michael G.; Deline, Chris; Kurtz, Sarah

    2015-09-02

    Partial shade of monolithic thin-film PV modules can cause reverse-bias conditions leading to permanent damage. In this work, we propose a partial shade stress test for thin-film PV modules that quantifies permanent performance loss. We designed the test with the aid of a computer model that predicts the local voltage, current and temperature stress that result from partial shade. The model predicts the module-scale interactions among the illumination pattern, the electrical properties of the photovoltaic material and the thermal properties of the module package. The test reproduces shading and loading conditions that may occur in the field. It accounts for reversible light-induced performance changes and for additional stress that may be introduced by light-enhanced reverse breakdown. We present simulated and experimental results from the application of the proposed test.

  14. Measurement of bidirectional optical properties of complex shading devices

    SciTech Connect (OSTI)

    Klems, J.H.; Warner, J.L.

    1995-01-01

    A new method of predicting the solar heat gain through complex fenestration systems involving nonspecular layers such as shades or blinds has been examined in a project jointly sponsored by ASHRAE and DOE. In this method, a scanning radiometer is used to measure the bidirectional radiative transmittance and reflectance of each layer of a fenestration system. The properties of systems containing these layers are then built up computationally from the measured layer properties using a transmission/multiple-reflection calculation. The calculation produces the total directional-hemispherical transmittance of the fenestration system and the layer-by-layer absorptances. These properties are in turn combined with layer-specific measurements of the inward-flowing fractions of absorbed solar energy to produce the overall solar heat gain coefficient. This paper describes the method of measuring the spatially averaged bidirectional optical properties using an automated, large-sample gonioradiometer/photometer, termed a ``Scanning Radiometer.`` Property measurements are presented for one of the most optically complex systems in common use, a venetian blind. These measurements will form the basis for optical system calculations used to test the method of determining performance.

  15. Photovoltaic Shading Testbed for Module-Level Power Electronics: 2014 Update

    SciTech Connect (OSTI)

    Deline, C.; Meydbray, J.; Donovan, M.

    2014-08-01

    The 2012 NREL report 'Photovoltaic Shading Testbed for Module-Level Power Electronics' provides a standard methodology for estimating the performance benefit of distributed power electronics under partial shading conditions. Since the release of the report, experiments have been conducted for a number of products and for different system configurations. Drawing from these experiences, updates to the test and analysis methods are recommended. Proposed changes in data processing have the benefit of reducing the sensitivity to measurement errors and weather variability, as well as bringing the updated performance score in line with measured and simulated values of the shade recovery benefit of distributed PV power electronics. Also, due to the emergence of new technologies including sub-module embedded power electronics, the shading method has been extended to include power electronics that operate at a finer granularity than the module level. An update to the method is proposed to account for these emerging technologies that respond to shading differently than module-level devices. The partial shading test remains a repeatable test procedure that attempts to simulate shading situations as would be experienced by typical residential or commercial rooftop photovoltaic (PV) systems. Performance data for multiple products tested using this method are discussed, based on equipment from Enphase, Solar Edge, Maxim Integrated and SMA. In general, the annual recovery of shading losses from the module-level electronics evaluated is 25-35%, with the major difference between different trials being related to the number of parallel strings in the test installation rather than differences between the equipment tested.

  16. POLICY FLASH 2014-25 Revision to the Procurement Strategy Panel...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    POLICY FLASH 2014-25 Revision to the Procurement Strategy Panel (PSP) Briefing Process POLICY FLASH 2014-25 Revision to the Procurement Strategy Panel (PSP) Briefing Process For ...

  17. Webinar: Procuring Fuel Cells for Stationary Power: A Guide for Federal

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Decision Makers | Department of Energy Procuring Fuel Cells for Stationary Power: A Guide for Federal Decision Makers Webinar: Procuring Fuel Cells for Stationary Power: A Guide for Federal Decision Makers Download presentation slides from the May 8, 2012, Fuel Cell Technologies Program webinar, "Procuring Fuel Cells for Stationary Power: A Guide for Federal Facility Decision Makers." PDF icon Procuring Fuel Cells for Stationary Power: A Guide for Federal Facility Decision Makers

  18. Peer Review of the Federal Energy Management Program Energy-Efficient Product Procurement Portfolio

    Broader source: Energy.gov [DOE]

    Document details the peer review of the Federal Energy Management Program Energy-Efficient Product Procurement portfolio.

  19. Procuring and Implementing Solar Projects on Public Buildings: How to Avoid Common Pitfalls (Text Version)

    Broader source: Energy.gov [DOE]

    Transcript of the webinar, "Procuring and Implementing Solar Projects on Public Buildings: How to Avoid Common Pitfalls."

  20. Handbook for preparation of Individual Procurement Action Report

    SciTech Connect (OSTI)

    1996-10-01

    The Procurement and Assistance Data System (PADS) provides a mechanism for collecting, assembling, organizing, and presenting acquisition and assistance data for the Department of Energy (DOE). This handbook and associated documents establish a uniform system to report acquisition/assistance data to PADS for the collection, processing, and dissemination of official statistical data on the Department`s acquisition and assistance actions. The data provides, based on information available at the time of request, a basis for any recurring and special reports to the senior procurement executive, Congress, General Accounting Office (GAO), Federal executive agencies, Office of management and Budget (OMB), and the general public. It provides information for measuring and assessing the extent to which small business firms and small disadvantages business enterprises are sharing in DOE placement, and for other acquisition and assistance policy and management control purposes. The Handbook for the Preparation of the Individual Procurement Action Report (IPAR) has been designed in two sections; Procurement and Financial Assistance to support the individual forms.

  1. Methods for Procuring Power System Flexibility, Greening the Grid

    SciTech Connect (OSTI)

    Katz, Jessica; Cochran, Jaquelin; Miller, Mackay

    2015-05-01

    Greening the Grid provides technical assistance to energy system planners, regulators, and grid operators to overcome challenges associated with integrating variable renewable energy into the grid. This document, part of a Greening the Grid toolkit, introduces administrative and incentive-based mechanisms for procuring a cost-effective mix of flexibility sources.

  2. Energy Department Issues Draft Request For Proposal for Nuclear Regulatory Commission Licensed Facilities Procurement

    Broader source: Energy.gov [DOE]

    Cincinnati – The U.S. Department of Energy (DOE) today issued a Draft Request for Proposal (DRFP) for the Nuclear Regulatory Commission (NRC) Licensed Facilities procurement. The NRC Licensed Facilities procurement is one of the four procurements that resulted from the Idaho Site Office of Environmental Management Post FY 2015 Acquisition Planning.

  3. Edge coating apparatus with movable roller applicator for solar cell substrates

    DOE Patents [OSTI]

    Pavani, Luca; Abas, Emmanuel

    2012-12-04

    A non-contact edge coating apparatus includes an applicator for applying a coating material on an edge of a solar cell substrate and a control system configured to drive the applicator. The control system may drive the applicator along an axis to maintain a distance with an edge of the substrate as the substrate is rotated to have the edge coated with a coating material. The applicator may include a recessed portion into which the edge of the substrate is received for edge coating. For example, the applicator may be a roller with a groove. Coating material may be introduced into the groove for application onto the edge of the substrate. A variety of coating materials may be employed with the apparatus including hot melt ink and UV curable plating resist.

  4. Innovations in Voluntary Renewable Energy Procurement: Methods for Expanding Access and Lowering Cost for Communities, Governments, and Businesses (Technical Report)

    SciTech Connect (OSTI)

    Heeter, J.; McLaren, J.

    2012-09-01

    This guide explores five innovative options for voluntarily procuring renewable energy generation or systems.

  5. Computer simulation of shading and blocking: Discussion of accuracy and recommendations

    SciTech Connect (OSTI)

    Lipps, F W

    1992-04-01

    A field of heliostats suffers losses caused by shading and blocking by neighboring heliostats. The complex geometry of multiple shading and blocking events suggests that a processing code is needed to update the boundary vector for each shading or blocking event. A new version, RSABS, (programmer`s manual included) simulates the split-rectangular heliostat. Researchers concluded that the dominant error for the given heliostat geometry is caused by the departure from planarity of the neighboring heliostats. It is recommended that a version of the heliostat simulation be modified to include losses due to nonreflective structural margins, if they occur. Heliostat neighbors should be given true guidance rather than assumed to be parallel, and the resulting nonidentical quadrilateral images should be processed, as in HELIOS, by ignoring overlapping events, rare in optimized fields.

  6. TO: Procurement Directors/Contracting Officers FROM: Acting Chief

    Energy Savers [EERE]

    09 DATE: December 29, 2015 TO: Procurement Directors/Contracting Officers FROM: Acting Chief Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition Management SUBJECT: Federal Acquisition Circular (FAC) 2005-85 SUMMARY: Attached for your information is a brief summary of Federal Acquisition Regulation (FAR) amendments, published in the December 4, 2015 Federal Register at 80 FR 75902. FAC 2005- 85 issued 4 final rules, 2 interim rules and technical amendments.

  7. TO: Procurement Directors/Contracting Officers FROM: Acting Division Chief

    Energy Savers [EERE]

    POLICY FLASH 2016-07 DATE: December 31, 2015 TO: Procurement Directors/Contracting Officers FROM: Acting Division Chief Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition Management SUBJECT: Reporting and Use of Information Concerning Recipient Integrity and Performance SUMMARY: Beginning on January 1, 2016, DOE COs are required to include the attached FOA and Award Term and Condition for Recipient Integrity and Performance Matters and review FAPIIS as part

  8. TO: Procurement Directors/Contracting Officers FROM: Chief

    Energy Savers [EERE]

    10 DATE: January 4, 2016 TO: Procurement Directors/Contracting Officers FROM: Chief Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition Management SUBJECT: Federal Acquisition Circular (FAC) 2005-86 SUMMARY: Attached for your information is a brief summary of Federal Acquisition Regulation (FAR) amendments, published in the December 31, 2015 Federal Register at 80 FR 81886. FAC 2005- 86 issued 3 final rules and 1interim rule. This Flash will be available

  9. NNSA Announces Procurement of Penguin Computing Clusters to Support

    National Nuclear Security Administration (NNSA)

    Stockpile Stewardship at National Labs | National Nuclear Security Administration Announces Procurement of Penguin Computing Clusters to Support Stockpile Stewardship at National Labs October 20, 2015 The National Nuclear Security Administration's (NNSA's) Lawrence Livermore National Laboratory today announced the awarding of a subcontract to Penguin Computing - a leading developer of high-performance Linux cluster computing systems based in Silicon Valley - to bolster computing for

  10. TO: Procurement Directors/Contracting Officers FROM: Director

    Office of Environmental Management (EM)

    08 DATE: December 29, 2015 TO: Procurement Directors Heads of Contracting Activities FROM: Acting Chief Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition Management SUBJECT: Archival of Policy Flashes and attachments SUMMARY: This office is reviewing all its energy.gov websites to ensure current guidance is easily accessible and previous guidance is archived for future reference. To that end, all Policy Flashes and attachments from FY2001 - FY2014 have been

  11. TO: Procurement Directors/Contracting Officers FROM: Director

    Office of Environmental Management (EM)

    74 DATE: August 13, 2013 TO: Procurement Directors/Contracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Quarterly Notification of the DOE's Differing Professional Opinion Process SUMMARY: Attached is a Memorandum issued by the Deputy Secretary on August 2, 2013, highlighting requirements for complying with Department of Energy (DOE) Order (O) 442.2, Differing Professional Opinions for

  12. TO: Procurement Directors FROM: Director Office of Policy Division

    Office of Environmental Management (EM)

    3-42 DATE: March 20, 2013 TO: Procurement Directors FROM: Director Office of Policy Division Office of Acquisition and Project Management SUBJECT: Acquisition Guide Chapter 19.1 - Summary of Small Business Administration and Department of Energy Partnership Agreement SUMMARY: Acquisition Guide Chapter 19.1 is revised to reflect changes in the new partnership agreement (attached). Revisions are indicated by bolded text. This Flash will be available online at the following website:

  13. TO: Procurement Directors/Contracting Officers FROM: Director

    Office of Environmental Management (EM)

    01 DATE: October 2, 2012 TO: Procurement Directors/Contracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Continuing Appropriations Resolution, 2013 -- Implementation of Division B, Title III, Title V and Division C Title VII, Consolidated Appropriations Act, 2012, Pub. L. No.112-74 and Related Conference Report SUMMARY: Section 101(a)(4) of the Continuing Appropriations Resolution, 2013, Pub. L

  14. TO: Procurement Directors/Contracting Officers FROM: Director

    Office of Environmental Management (EM)

    3 DATE: January 28, 2013 TO: Procurement Directors/Contracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Department of Energy Acquisition Regulation (DEAR) Final Rule for changes to Parts 908, 945, 952, and 970 regarding Government Property SUMMARY: Department of Energy Acquisition Regulation (DEAR) Final Rule for changes to Parts 908, 945, 952, and 970 regarding Government Property was

  15. A Little Shade Can Go a Long Way | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    A Little Shade Can Go a Long Way A Little Shade Can Go a Long Way May 10, 2010 - 11:02am Addthis Allison Casey Senior Communicator, NREL Spring is my favorite time of year. The snow (finally!) stops, the temperature is perfect, and everything is colorful again. We rarely need to turn on the heat or air conditioner to stay comfortable at home, and there's nothing better than a relaxing evening on the deck. But that doesn't last long, and soon the hot days of summer will be upon us. At my house,

  16. Conductor load bearing roller for a gas-insulated transmission line having a corrugated outer conductor

    DOE Patents [OSTI]

    Fischer, William H.; Yoon, Kue H.

    1984-04-10

    A gas-insulated transmission line includes a corrugated outer conductor, an inner conductor disposed within and insulated from the outer conductor by means of support insulators and an insulating gas, and a transport device for supporting and permitting movement of the inner conductor/insulating support assembly axially along the corrugated outer conductor without radial displacement. The transport device includes two movable contacts, such as skids or rollers, supported on a common pivot lever, the pivot lever being rotatably disposed about a pivot lever axis, which pivot lever axis is in turn disposed on the periphery of a support insulator or particle trap if one is used. The movable contacts are separated axially a distance equal to the axial distance between the peaks and valleys of the corrugations of the outer conductor and separated radially a distance equal to the radial distance between the peaks and valleys of the corrugations of the outer conductor. The transport device has the pivot lever axis disposed perpendicular to the direction of travel of the inner conductor/insulating support assembly.

  17. Evaluation of solar heat gain coefficient for solar-control glazings and shading devices

    SciTech Connect (OSTI)

    Harrison, S.J.; Wonderen, S.J. van

    1998-10-01

    The determination of solar heat gain coefficient (SHGC) values for complex fenestration systems is required to evaluate building energy performance, to estimate peak electrical loads, and to ensure occupant comfort. In the past, simplified techniques have been used to calculate the values of SHGC for fenestration systems. As glazing systems that incorporate complex geometries become more common, test methods are required to evaluate these products and to aid in the development of new computational tools. Recently, a unique facility and test method for the experimental determination of SHGC values were developed and demonstrated for simple fenestration systems. The study described in this paper further applies this method to a variety of commercially available glazing and shading systems (e.g., heat-absorbing insulated glazing units (IGUs), reflective film and suspended film IGUs), and shading devices (i.e., slat blinds and shades). Testing was conducted in a solar simulator facility using a specially designed window calorimeter. The results of this study demonstrate the feasibility of the solar simulator-based test method for the evaluation of SHGC values for solar-control glazings and shading devices.

  18. SF 6431-E;ARTICLES FOR PROCESS AND FABRICATION LABORATORY PROCUREMENT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1-E (7-2013) Supersedes (4-2000) issue Procurement Center Albuquerque, New Mexico 87185 ARTICLES FOR PROCESS AND FABRICATION LABORATORY PROCUREMENT 1. GENERAL PRODUCT and INSPECTION REPORTS REQUIREMENTS Unless otherwise specified in this procurement or superseded by specific drawing requirements, all product submitted to Sandia for acceptance shall meet the requirements of Sandia Specification 9900000 - General Requirements And Drawing Interpretations. Product must be adequately packaged for

  19. DOE Field Procurement Offices Where EM Work is Performed | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Services » Program Management » Acquisition » DOE Field Procurement Offices Where EM Work is Performed DOE Field Procurement Offices Where EM Work is Performed The following is a list of links to the Procurement Offices where Environmental Management work is performed in the Department of Energy. You may contact these offices directly concerning potential business opportunities or for any questions you may have about their programs. The links to the web sites are directed to the

  20. TO: Procurement Directors FROM: Chief Contract and Financial Assistance Policy Division

    Energy Savers [EERE]

    POLICY FLASH 2015-33 DATE: August 10, 2015 TO: Procurement Directors FROM: Chief Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition Management SUBJECT: "Guidance for Procurement Officials" Webpage Refresh SUMMARY: This policy flash provides updated links to the resources provided on the "Guidance for Procurement Officials" webpage. We are refreshing the webpage to update its information and tools; provide new search capabilities; and

  1. TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division

    Office of Environmental Management (EM)

    POLICY FLASH 2012-43 DATE: May 14, 2012 TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division Office of Policy Office of Procurement and Assistance Management SUBJECT: Acquisition Planning: Revised DOE Acquisition Guide Chapter 7.1 SUMMARY: Acquisition Guide Chapter 7.1 is revised to remind the planner when planning for an interagency acquisition to perform a determination of best procurement approach, business case analysis and/or Economy Act

  2. Bulk Fuel Procurement Process & Alternative Drop-in Fuel | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Bulk Fuel Procurement Process & Alternative Drop-in Fuel Bulk Fuel Procurement Process & Alternative Drop-in Fuel Jeanne Binder, DLA Energy, presentation on Bulk Fuel Procurement Process & Alternative Drop-in Fuel at the Advanced Biofuels Industry Roundtable. PDF icon 7_binder_roundtable.pdf More Documents & Publications DLA Energy: Your Supplemental Energy Contracting Venue Advanced Drop-In Biofuels Initiative Agenda FUPWG Spring 2015 Agenda and Presentations

  3. Procuring and Implementing Solar Projects on Public Buildings: How to Avoid Common Pitfalls

    Broader source: Energy.gov [DOE]

    This webinar covered good practices for photovoltaic and solar water heating request for proposal processes, pitfalls, and helpful tools and resources to support procurement and implementation.

  4. Webinar: Procuring Fuel Cells for Stationary Power: A Guide for Federal Facility Decision Makers

    Broader source: Energy.gov [DOE]

    Video recording and text version of the webinar titled, Procuring Fuel Cells for Stationary Power: A Guide for Federal Facility Decision Makers, originally presented on May 8, 2012.

  5. Procuring Fuel Cells for Stationary Power: A Guide for Federal Decision Makers

    Broader source: Energy.gov [DOE]

    Presentation slides from the May 8, 2012, Fuel Cell Technologies Program webinar, Procuring Fuel Cells for Stationary Power: A Guide for Federal Facility Decision Makers.

  6. Office of the Assistant General Counsel for Procurement and Financial Assistance

    Broader source: Energy.gov [DOE]

    The Office of the Assistant General Counsel for Procurement and Financial Assistance provides legal support and advice regarding the Department's massive contractual expenditures and financial...

  7. DOE Webinar on Alternative Fuel and Advanced Vehicle Procurement Aggregating Initiatives FOA

    Broader source: Energy.gov [DOE]

    Hosted by the U.S. Department of Energy, this informational webinar will cover details of the Alternative Fuel and Advanced Vehicle Procurement Aggregating Initiatives funding opportunity.

  8. Memorandum for Chief Acquisition Officers, Senior Procurement Executives

    Energy Savers [EERE]

    A N A G E M E N T A N D B U D G E T W A S H I N G T O N , D . C . 2 0 5 0 3 O F F I C E O F F E D E R A L P R O C U R E M E N T P O L I C Y June 6, 2008 MEMORANDUM FOR CHIEF ACQUISITION OFFICERS SENIOR PROCUREMENT EXECUTIVES FROM: Paul A. Denett Administrator SUBJECT: Improving the Management and Use of Interagency Acquisitions Interagency acquisitions offer important benefits to federal agencies, including economies and efficiencies and the ability to leverage resources. The attached guidance

  9. DOE-ID Procurement Services � the action team

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE-ID Procurement Services � the action team Passage of the American Recovery and Reinvestment Act of 2009 included billions of dollars in additional funding for energy efficiency improvements to U.S. homes and businesses. By early July, the U.S. Department of Energy was hard pressed to get that funding to the communities who needed it to reduce their power bills. That�s when DOE�s Office of Energy Efficiency asked the department�s Idaho Operations Office for support from DOE-ID�s

  10. Closure Report for Corrective Action Unit 407: Roller Coaster RADSAFE Area, Tonopah Test Range, Nevada

    SciTech Connect (OSTI)

    T. M. Fitzmaurice

    2001-12-01

    This closure report (CR) provides documentation for the closure of the Roller Coaster RADSAFE Area (RCRSA) Corrective Action Unit (CAU) 407 identified in the Federal Facility Agreement and Consent Order (FFACO) (Nevada Division of Environmental Protection [NDEP] et al., 1996). CAU 407 is located at the Tonopah Test Range (TTR), Nevada. The TTR is approximately 225 kilometers (km) (140 miles [mi]) northwest of Las Vegas, Nevada (Figure 1). The RCRSA is located on the northeast comer of the intersection of Main Road and Browne's Lake Road, which is approximately 8 km (5 mi) south of Area 3 (Figure 1). The RCRSA was used during May and June of 1963 to decontaminate vehicles, equipment, and personnel from the Double Tracks and Clean Slate tests. Investigation of the RCRSA was conducted from June through November of 1998. A Corrective Action Decision Document (CADD) (U.S. Department of Energy, Nevada Operations Office [DOEN], 1999) was approved in October of 1999. The purpose of this CR is to: Document the closure activities as proposed in the Corrective Action Plan (CAP) (DOEM, 2000). Obtain a Notice of Completion from the NDEP. Recommend the movement of CAU 407 from Appendix III to Appendix IV of the FFACO. The following is the scope of the closure actions implemented for CAU 407: Removal and disposal of surface soils which were over three times background for the area. Soils identified for removal were disposed of at the Area 5 Radioactive Waste Management Site (RWMS) at the Nevada Test Site (NTS). Excavated areas were backfilled with clean borrow soil located near the site. A soil cover was constructed over the waste disposal pit area, where subsurface constituents of concern remain. The site was fenced and posted as an ''Underground Radioactive Material'' area.

  11. Solar heat gain through fenestration systems containing shading: Summary of procedures for estimating performance from minimal data

    SciTech Connect (OSTI)

    Klems, Joseph H.

    2001-03-01

    The computational methods for calculating the properties of glazing systems containing shading from the properties of their components have been developed, but the measurement standards and property data bases necessary to apply them have not. It is shown that with a drastic simplifying assumption these methods can be used to calculate system solar-optical properties and solar heat gain coefficients for arbitrary glazing systems, while requiring limited data about the shading. Detailed formulas are presented, and performance multipliers are defined for the approximate treatment of simple glazings with shading. As higher accuracy is demanded, the formulas become very complicated.

  12. WAP Memorandum 015: Weatherization Financial Toolkit – 2 CFR 200 Regulations and Procurement Procedures

    Broader source: Energy.gov [DOE]

    This Memorandum serves to update and supersede the Financial Toolkit, previously issued in Weatherization Program Notice (WPN) 12-4, Weatherization Assistance Program Financial Management Training Toolkit dated December 9, 2011, and the Procurement Toolkit previously issued in WPN 10-3, Procurement Toolkit CD, dated October 30, 2009.

  13. Effect of shading by the table coral Acropora Hyacinthus on understory corals. [Acropora; Pocillopora

    SciTech Connect (OSTI)

    Stimson, J.

    1985-02-01

    Field surveys at Enewetak Atoll, Marshall Islands, show that coral density and diversity is much lower beneath Acropora table corals than in adjacent unshaded areas. Additionally, the understory community is predominantly composed of massive and encrusting species, while branching Acropora and Pocillopora predominate in unshaded areas. Results of experiments in which coral fragments were transferred to the shade of table Acropora and to adjacent unshaded areas show that shading slows the growth and leads to higher mortality of branching species, while massive and encrusting species are unaffected. Light measurements made beneath table Acropora show that illumination and irradiance values fall to levels at which most hermatypic corals do not occur. The fast-growing but fragile table Acropora are abundant in a wide variety of atoll habitats and grow rapidly to form a canopy approx. = 50 cm above the substrate. However, table Acropora also have high mortality rates, so that there is continuous production of unshaded areas. The growth and death of tables thus create local disturbances, and the resulting patchwork of recently shaded and unshaded areas may enhance coral diversity in areas of high coral cover.

  14. Microsoft Word - 4March08_SCADA_Procurement.doc

    Energy Savers [EERE]

    48D7DF19-707E-28B27A.doc Microsoft Word - 48D7DF19-707E-28B27A.doc PDF icon Microsoft Word - 48D7DF19-707E-28B27A.doc More Documents & Publications Microsoft Word - ARRAAttachment12v1.doc Microsoft Word - Fact Sheet Energy Speech 082508 FINAL.doc Microsoft Word - GSP_Charter.doc

    INL is a U.S. Department of Energy National Laboratory operated by Battelle Energy Alliance INL/EXT-06-11516 Revision 3 Cyber Security Procurement Language for Control Systems Version 1.8 Sponsor: Department of

  15. CATEGORY Total Procurement Total Small Business Small Disadvantaged

    National Nuclear Security Administration (NNSA)

    CATEGORY Total Procurement Total Small Business Small Disadvantaged Business Woman Owned Small Business HubZone Small Business Veteran-Owned Small Business Service Disabled Veteran Owned Small Business FY 2013 Dollars Accomplished $1,049,087,940 $562,676,028 $136,485,766 $106,515,229 $12,080,258 $63,473,852 $28,080,960 FY 2013 % Accomplishment 54.40% 13.00% 10.20% 1.20% 6.60% 2.70% FY 2014 Dollars Accomplished $868,961,755 $443,711,175 $92,478,522 $88,633,031 $29,867,820 $43,719,452 $26,826,374

  16. Energy-Efficient Window Treatments | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Quilted roller shades and some types of Roman shades feature several layers of fiber batting and sealed edges. These shades act as both insulation and air barrier, and control...

  17. Energy Department Issues Request For Proposal for the Environmental Management Headquarters Information Technology Services Procurement

    Broader source: Energy.gov [DOE]

    Cincinnati – The U.S. Department of Energy (DOE) today issued a Request for Proposal (RFP) for the Environmental Management (EM) Headquarters (HQ) Information Technology (IT) Services procurement

  18. Energy Department Issues Draft Request For Proposal for the Environmental Management Headquarters Information Technology Services Procurement

    Broader source: Energy.gov [DOE]

    Cincinnati – The U.S. Department of Energy (DOE) today issued a Draft Request for Proposal (DRFP) for the Environmental Management (EM) Headquarters (HQ) Information Technology (IT) Services procurement.

  19. Annual report procurement and logistics management center Sandia National Laboratories fiscal year 2002.

    SciTech Connect (OSTI)

    Palmer, David L.

    2003-05-01

    This report summarizes the purchasing and transportation activities of the Procurement and Logistics Management Center for Fiscal Year 2002. Activities for both the New Mexico and California locations are included.

  20. Setup and organisation of a NDA-system procurement project

    SciTech Connect (OSTI)

    Botte, John; Gielen, Paul

    2007-07-01

    Belgoprocess is momentarily in the process of purchasing its fifth NDA-system. Measurement systems are, although based on general designs, not from the shelf items but tailor-made sophisticated and highly automated devices. It is obvious that such a project cannot be carried out by solely a NDA team, but needs a multifunctional team. This team combines NDA expertise with experts in civil works, electrical and mechanical engineering, procurement, IT, safety and legal administration. From less positive experiences in the past, Belgoprocess learned a lot and has now a systematic in place. This systematic structures the project from definition of requirements to operation, a two to three year process. This paper defines the phases of a NDA project and gives for each phase some do's and don'ts. A second subject is the writing and handling of the vast but needed and required documentation. It gives a brief overview of the over thirty documents and files needed. The described, integrated and formal approach reduces the risk of failing projects, systems not meeting the expectations or denied qualification. It puts clear agreements in place, smoothening the relationship between company, supplier and authorities. (authors)

  1. Analytically calculating shading in regular arrays of sun-pointing collectors

    SciTech Connect (OSTI)

    Meller, Yosef

    2010-11-15

    A method is presented for deriving an algorithm for analytically calculating shading of sun-pointing solar collectors by other identical collectors in the field. The method is particularly suited to regularly-spaced collectors, with convex aperture shapes. Using this method, an algorithm suitable for circular-aperture collectors is derived. The algorithm is validated against results obtained using an existing algorithm, and an example for usage of the algorithm as a tool for validating assumptions of an existing algorithm is presented. (author)

  2. Thermal and Electrical Effects of Partial Shade in Monolithic Thin-Film Photovoltaic Modules: Preprint

    SciTech Connect (OSTI)

    Silverman, Timothy J.; Deceglie, Michael G.; Sun, Xingshu; Garris, Rebekah L.; Alam, Muhammad Ashraful; Deline, Chris; Kurtz, Sarah

    2015-09-02

    Photovoltaic cells can be damaged by reverse bias stress, which arises during service when a monolithically integrated thin-film module is partially shaded. We introduce a model for describing a module's internal thermal and electrical state, which cannot normally be measured. Using this model and experimental measurements, we present several results with relevance for reliability testing and module engineering: Modules with a small breakdown voltage experience less stress than those with a large breakdown voltage, with some exceptions for modules having light-enhanced reverse breakdown. Masks leaving a small part of the masked cells illuminated can lead to very high temperature and current density compared to masks covering entire cells.

  3. Procuring Fuel Cells for Stationary Power: A Guide for Federal Facility

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Decision Makers | Department of Energy Procuring Fuel Cells for Stationary Power: A Guide for Federal Facility Decision Makers Procuring Fuel Cells for Stationary Power: A Guide for Federal Facility Decision Makers This step-by-step manual guides readers through the process of implementing a fuel cell stationary power project. The guide outlines the basics of fuel cell technology and describes how fuel cell projects can meet on-site energy service needs as well as support strategic agency

  4. TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division

    Office of Environmental Management (EM)

    20 DATE: January 13, 2012 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Procurement and Assistance Management SUBJECT: Acquisition Guide Chapter 3.3 - Compliance with U.S. Export Control Laws, Regulations, and Policies SUMMARY: The subject guide chapter provides introductory information on compliance with applicable U.S. export control laws, regulations and policies when exporting. The guidance in this Flash will be

  5. TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division

    Office of Environmental Management (EM)

    16 DATE: December 22, 2011 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Procurement and Assistance Management SUBJECT: Acquisition Career Management Handbook Change - Revised Contracting Officer's Representative Certification (COR) SUMMARY: A recent review of the January 2009 issue of the Department of Energy (DOE) Acquisition Career Management Program (ACMP) Handbook identified many areas that require an update. Although

  6. Table lamp with dynamically controlled lighting distribution and uniformly illuminated luminous shade

    DOE Patents [OSTI]

    Siminovitch, Michael J.; Page, Erik R.

    2002-01-01

    A double lamp table or floor lamp lighting system has a pair of compact fluorescent lamps (CFLs) or other lamps arranged vertically, i.e. one lamp above the other, with a reflective septum in between. By selectively turning on one or both of the CFLs, down lighting, up lighting, or both up and down lighting is produced. The control system can also vary the light intensity from each CFL. The reflective septum ensures that almost all the light produced by each lamp will be directed into the desired light distribution pattern which is selected and easily changed by the user. In a particular configuration, the reflective septum is bowl shaped, with the upper CFL sitting in the bowl, and a luminous shade hanging down from the bowl. The lower CFL provides both task lighting and uniform shade luminance. Planar compact fluorescent lamps, e.g. circular CFLs, particularly oriented horizontally, are preferable. CFLs provide energy efficiency. However, other types of lamps, including incandescent, halogen, and LEDs can also be used in the fixture. The lighting system may be designed for the home, hospitality, office or other environments.

  7. Departmental Business Instrument Numbering System for Actions Conducted Outside of the Strategic Integrated Procurement Enterprise System (STRIPES)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-05-23

    The Order prescribes procedures for assigning identifying numbers to all new business instruments processed outside the Strategic Integrated Procurement Enterprise System. Cancels DOE O 540.1A.

  8. Procurement Evaluation & Re-Engineering Team (PERT) and Establishment of a 5-year Cycle with Corresponding Schedule

    Broader source: Energy.gov [DOE]

    The Senior Procurement Executive has issued guidance (attached) that endorses the PERT program, establishes the 5-year cycle and PERT review schedule from FY 2014 to FY 2018.

  9. Solar Census - Perfecting the Art of Automated, Remote Solar Shading Assessments (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2014-04-01

    To validate the work completed by Solar Census as part of the Department of Energy SunShot Incubator 8 award, NREL validated the performanec of the Solar Census Surveyor tool against the industry standard Solmetric SunEye measurements for 4 residential sites in California who experienced light to heavy shading. Using the a two one-sided test (TOST) of statistical equivalence, NREL found that the mean differences between the Solar Census and SunEye mean solar access values for Annual, Summer, and Winter readings fall within the 95% confidence intervals and the confidence intervals themselves fall within the tolerances of +/- 5 SAVs, the Solar Census calculations are statistically equivalent to the SunEye measurements.

  10. Non-binding conductor load bearing roller for a gas-insulated transmission line having a corrugated outer conductor

    DOE Patents [OSTI]

    Fischer, William H.

    1984-01-01

    A gas-insulated transmission line includes a corrugated outer conductor, an inner conductor disposed within and insulated from the outer conductor by means of support insulators and an insulating gas, and a non-binding transport device for supporting and permitting movement of the inner conductor/insulating support assembly axially along the corrugated outer conductor without radial displacement and for moving without binding along corrugations of any slope less than vertical. The transport device includes two movable contacts, such as skids or rollers, supported on a common pivot lever, the pivot lever being rotatably disposed about a pivot lever axis, which pivot lever axis is in turn disposed on the periphery of a support insulator or particle trap if one is used. The movable contacts are separated axially a distance equal to the axial distance between the peaks and valleys of the corrugations of the outer conductor and separated radially a distance equal to the radial distance between the peaks and valleys of the corrugations of the outer conductor. The transport device has the pivot lever axis disposed parallel to the motion of travel of the inner conductor/insulating support assembly.

  11. A position paper for a central procurement organization for the nuclear power industry

    SciTech Connect (OSTI)

    Hendricks, J.R.

    1996-06-01

    This paper integrates the results of numerous nuclear utility industry meetings with commercial business practices. The Central Procurement Organization (CPO) is designed to achieve an immediate 30%--50% reduction in total procurement, engineering qualification, warehousing, and distribution cost. Three (3) areas define a CPO success criteria: (1) Lean, credible, and cost-effective issues discussed include facility cost, operational cost, staff expertise, product priorities, warehousing, and distribution, (2) Common technical, commercial, and quality requirement issues discussed include current industry practices and proposed future methodologies, and (3) Financial survivability issues which are the most critical since the CPO must exist during changing internal and external utility environments.

  12. Aug. 5 Webinar to Showcase Best Practices in Procurement for Tribes

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) Office of Indian Energy, in partnership with the Western Area Power Administration (Western), will present the next Tribal Renewable Energy Series webinar, Best Practices in Procurement, on Wednesday, Aug. 5, 2015, from 11 a.m. to 12:30 p.m. Mountain time.

  13. Enterprise Assessments Review of Waste Isolation Pilot Plant Engineering and Procurement Processes … November 2015

    Energy Savers [EERE]

    Waste Isolation Pilot Plant Engineering and Procurement Processes November 2015 Office of Nuclear Safety and Environmental Assessments Office of Environment, Safety and Health Assessments Office of Enterprise Assessments U.S. Department of Energy i Table of Contents Acronyms ...................................................................................................................................................... ii Executive Summary

  14. DOE Issues Request for Information for Potential WIPP Transportation Services Procurement

    Broader source: Energy.gov [DOE]

    Cincinnati -- The U.S. Department of Energy (DOE) Environmental Management Consolidated Business Center (EMCBC) today issued a Sources Sought/Request for Information (RFI) seeking interested parties with specialized capabilities for the Environmental Management (EM) Waste Isolation Pilot Plant (“WIPP”) Transportation Services procurement.

  15. Energy Department Issues Request For Proposal for Nuclear Regulatory Commission Licensed Facilities Procurement

    Broader source: Energy.gov [DOE]

    Cincinnati – The U.S. Department of Energy (DOE) today issued a final Request for Proposal (RFP) for the Nuclear Regulatory Commission (NRC) Licensed Facilities procurement. The NRC Licensed Facilities contract is for managing Spent Nuclear Fuel (SNF) storage facilities and licenses under NRC regulations.

  16. Visual Comfort Analysis of Innovative Interior and Exterior Shading Systems for Commercial Buildings using High Resolution Luminance Images

    SciTech Connect (OSTI)

    Konis, Kyle; Lee, Eleanor; Clear, Robert

    2011-01-11

    The objective of this study was to explore how calibrated high dynamic range (HDR) images (luminance maps) acquired in real world daylit environments can be used to characterize, evaluate, and compare visual comfort conditions of innovative facade shading and light-redirecting systems. Detailed (1536 x 1536 pixel) luminance maps were time-lapse acquired from two view positions in an unoccupied full scale testbed facility. These maps were analyzed using existing visual comfort metrics to quantify how innovative interior and exterior shading systems compare to conventional systems under real sun and sky conditions over a solstice-to-solstice test interval. The results provide a case study in the challenges and potential of methods of visualizing, evaluating and summarizing daily and seasonal variation of visual comfort conditions computed from large sets of image data.

  17. INSPECTION REPORT Procurement Administration and Human Reliability Program Revocations Within the

    Energy Savers [EERE]

    Procurement Administration and Human Reliability Program Revocations Within the Office of Secure Transportation OAI-M-16-07 March 2016 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 March 21, 2016 MEMORANDUM FOR THE ADMINISTRATOR, NATIONAL NUCLEAR SECURITY ADMINISTRATION ASSOCIATE UNDER SECRETARY, OFFICE OF ENVIRONMENT, HEALTH, SAFETY, AND SECURITY FROM: George W. Collard Deputy Inspector General for Audits and

  18. NAICS Codes @ Headquarters Description: NAICS Codes used at Headquarters Procurement Services

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NAICS Codes @ Headquarters Description: NAICS Codes used at Headquarters Procurement Services Filters: Signed Date only show values between , Contracting Agency ID show only ('8900'), Contracting Office ID show only ('00001'), Date Signed only show values between '05/01/2011' and '04/30/2012', Last Modified Date only show values between Contracting Agency ID: 8900, Contracting Office ID: 00001 NAICS Code NAICS Description Action Obligation 541519 OTHER COMPUTER RELATED SERVICES 341

  19. Procuring Solar Energy: A Guide for Federal Facility Decision Makers, September 2010

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procuring Solar Energy: A Guide for Federal Facility Decision Makers SEPTEMBER 2010 Solar Energy Technologies Program Federal Energy Management Program National Renewable Energy Laboratory NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy,

  20. TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division

    Office of Environmental Management (EM)

    POLICY FLASH 2013-38 DATE: March 18, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Revised Merit Review Guide for Financial Assistance SUMMARY: Attached is the revised Merit Review Guide for Financial Assistance. Revisions include reformatting and updating of the information presented in the Guide and Attachments. This Flash will be available online at the following website:

  1. TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division

    Office of Environmental Management (EM)

    4-17 DATE: February 12, 2014 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Revised Acquisition Letter 2013-11- Non-Management and Operating (Non-M&O) Contractor Business Systems Clauses for Section H - Earned Value Management Clause SUMMARY: The attached Acquisition Letter (AL) 2013-11 (originally released in Policy Flash 2013-71 on August 5, 2013) revises one Section H Clause

  2. TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division

    Office of Environmental Management (EM)

    3 DATE: February 27, 2013 TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: DOE O 206.2 Identity, Credential, and Access Management (ICAM) SUMMARY: The Department issued a Contractor Requirements Document (CRD) for the subject Directive on February 19, 2013. Under the Department's Directives Program (DOE Order 251.1C), Heads of Field Elements are generally responsible for determining

  3. TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division

    Office of Environmental Management (EM)

    POLICY FLASH 2013-58 DATE: June 5, 2013 TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Revised Guide for Financial Assistance SUMMARY: Attached is a revised Guide for Financial Assistance. The Guide has been updated to reflect changes to web sites, organization names, systems, and DOE policies and practices since the guide was last issued. The revision date has been inserted in the

  4. Alleged Procurement and Hiring Practice Irregularities within the Office of Policy and International Affairs, INS-L-12-04

    Energy Savers [EERE]

    Audits and Inspections Inspection Report Alleged Procurement and Hiring Practice Irregularities within the Office of Policy and International Affairs INS-L-12-04 June 2012 Department of Energy Washington, DC 20585 June 22, 2012 MEMORANDUM FOR THE ASSISTANT SECRETARY FOR POLICY AND INTERNATIONAL AFFAIRS for FROM: Sandra D. Bruce Assistant Inspector General for Inspections Office of Inspector General SUBJECT: INFORMATION: Inspection Report on "Alleged Procurement and Hiring Practice

  5. Closure Report for Corrective Action Unit 404: Roller Coaster Sewage Lagoons and North Disposal Trench, Tonopah Test Range, Nevada with ROTC 1, Revision 0

    SciTech Connect (OSTI)

    Lynn Kidman

    1998-09-01

    This Closure Report provides the documentation for closure of the Roller Coaster Sewage Lagoons and North Disposal Trench Comective Action Unit (CAU) 404. CAU 404 consists of the Roller Coaster Sewage Lagoons (Corrective Action Site [CAS] TA-03-O01-TA-RC) and the North Disposal Trench (CAS TA-21-001-TA-RC). The site is located on the Tonopah Test Range, approximately 225 kilometers (km) (140 miles [mi]) northwest ofLas Vegas, Nevada. . The sewage lagoons received ~quid sanitary waste horn the Operation Roller Coaster Man Camp in 1963 and debris from subsequent range and construction cleanup activities. The debris and ordnance was subsequently removed and properly dispos~, however, pesticides were detected in soil samples born the bottom of the lagoons above the U,S. Environmental Protection Agency Region IX Prelimimuy Remediation Goals (EPA 1996). . The North Disposal Trench was excavated in 1963. Debris from the man camp and subsequent range and construction cleanup activities was placed in the trench. Investigation results indicated that no constituents of concern were detected in soil samples collected from the trench. Remedial alternative proposed in the Comctive Action Decision Document (CADD) fm the site was “Covering” (DOE, 1997a). The Nevada Division of”Enviromnental Protection (NDEP)-approved Correction Action Plan (CAP) proposed the “Covering” niethodology (1997b). The closure activities were completed in accorhce with the approwil CAP and consisted of baclctllling the sewage lagoons and disposal trench, constructing/planting an engineered/vegetative cover in the area of the sewage lagoons and dikposal trencQ installing a perimeter fence and signs, implementing restrictions on fi~e use, and preparing a Post-Closure Monitoring Plan. “ Since closure activities. for CAU 404 have been completed in accordance with the Nevada Division of Environmental Protection-approved CAP (DOE, 1997b) as documented in this Closure Report, the U.S. Department of Energy, NevadaOperations Office (DOE/NV) requests: CAU 404 be moved from Appendix III to Appendix IV of the Federal Facility Agreement and Consent Order. NDEP provide a Notice of Completion to the DOE/NV.

  6. U.S. Department of Energy Oak Ridge Operations Offlce Procurement and Cantrads Division

    National Nuclear Security Administration (NNSA)

    Oak Ridge Operations Offlce Procurement and Cantrads Division P.O. BOX 2001 Oak Ridge. TN 37831 SOLICITATION, OFFER AND AWARD Dlrect Del very Adotess' U S Deoanmenl of Energy Oar R doe Ooerat ons Ofice ~ r m u r e i e n t s n d Contracts Division ,200 Administration Road, ATTN: Ballard A. Jackson Jr Oak Ridse. TN 37830 I . THIS CONTRACT IS ARATED ORDER UNDER DPAS (15 CFR 700) I NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and

  7. Powering Up the Women's Procurement Program Presenters: Ann Sullivan Denise Farris

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Powering Up the Women's Procurement Program Presenters: Ann Sullivan Denise Farris Madison Services Group, Inc. Farris Law Firm LLC WIPP Government Relations WIPP Member 1156 15 th Street, NW, Suite 1100 1600 Genessee, Suite 433 Washington, DC 20005 Kansas City, MO 64106 Tel: 202 626 8528 Tel: 816 842 0800 Fax: 202 872 8543 Fax: 816 842 0877 Email: asullivan@madisonservicesgroup.com Email: dfarris@farrislawfirm.com 1 A Brief History of the WOSB Program « In 2000, Public Law 106-554

  8. TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division

    Office of Environmental Management (EM)

    2 DATE: February 27, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Fiscal Year 2013 Small Business Contracting Goals SUMMARY: DOE has received the following revised small business contracting goals for FY13: FY13 Goals Prime Sub Small Business 7.0% 52.0% SDB 5.0% 5.0% WOSB 5.0% 5.0% SDVOSB 3.0% 3.0% HUBZone 3.0% 3.0% This Flash will be available online at the following

  9. Fuelwood procurement for an industrial power plant: a case study of Dow Corning's program

    SciTech Connect (OSTI)

    Folger, A.G.; Sworden, P.G.; Bond, C.T.

    1984-08-01

    Dow Corning Corporation has developed effective procedures for meeting the fuelwood requirements of a 22.4 megawatt steam and electricity cogenerating power plant. The fuelwood procurement program of Dow Corning's Natural Resources Department involves special arrangements with private landowners, logging and hauling producers, and waste wood suppliers. The program's success is attributable to a favorable location, adequate allowance for advance planning, effective public relations, and flexible management. The program is significant because it demonstrates that industrial fuelwood requirements can be met and that improved production from nonindustrial private forests can be relied upon as a major source of fuelwood. 7 references, 7 figures.

  10. Procurement Integrity

    Broader source: Energy.gov (indexed) [DOE]

    to be within this definition. What are the Penalties for Violations? The following Criminal Penalties apply to knowingly (1) disclosing or (2) obtaining proposal or bid...

  11. SIGNATURES OF ILLICIT NUCLEAR PROCUREMENT NETWORKS: AN OVERVIEW OF PRELIMINARY APPROACHES AND RESULTS

    SciTech Connect (OSTI)

    Webster, Jennifer B.; Erikson, Luke E.; Gastelum, Zoe N.; Lewis, Valerie A.; Best, Daniel M.; Hogan, Emilie A.; Chikkagoudar, Satish

    2014-05-12

    The illicit trafficking of strategic nuclear commodities (defined here as the goods needed for a covert nuclear program excluding special nuclear materials) poses a significant challenge to the international nuclear nonproliferation community. Export control regulations, both domestically and internationally, seek to inhibit the spread of strategic nuclear commodities by restricting their sale to parties that may use them for nefarious purposes. However, export controls alone are not sufficient for preventing the illicit transfer of strategic nuclear goods. There are two major pitfalls to relying solely on export control regulations for the deterrence of proliferation of strategic goods. First, export control enforcement today relies heavily on the honesty and willingness of participants to adhere to the legal framework already in place. Secondly, current practices focus on the evaluation of single records which allow for the necessary goods to be purchased separately and hidden within the thousands of legitimate commerce transactions that occur each day, disregarding strategic information regarding several purchases. Our research presents two preliminary data-centric approaches for investigating procurement networks of strategic nuclear commodities. Pacific Northwest National Laboratory (PNNL) has been putting significant effort into nonproliferation activities as an institution, both in terms of the classical nuclear material focused approach and in the examination of other strategic goods necessary to implement a nuclear program. In particular, the PNNL Signature Discovery Initiative (SDI) has codified several scientific methodologies for the detection, characterization, and prediction of signatures that are indicative of a phenomenon of interest. The methodologies and tools developed under SDI have already been applied successfully to problems in bio-forensics, cyber security and power grid balancing efforts and they have now made the nonproliferation of strategic goods into a challenge problem for testing their methodology and tools. As a first step towards the detection and characterization of illicit procurement networks, our research examines procurement networks as defined by a system of entities (people or companies) that enter into transactions of specific items with one another. Once we have defined such networks, we are interested in answering questions about the behavior and characterization of such networks. The questions we wish to answer regarding procurement networks are, first, Can we detect networks within large, noisy datasets? and second, To what extent can we compare multiple networks and identify their similarities? As procurement networks can be naturally viewed as a graph, we have employed several graph analytic tools to aid in these tasks. In particular, Graphscape, an SDI tool, uses a novel method to approximate edit distance, a graph distance measure based on the number of changes needed to transform one graph into another, in order to measure how similar two given graphs are to each other. Given a set of graphs where vertices represent companies and edges represent a shipment from company A to company B, we can calculate an all-for-all comparison of graphs. In this way, we are able to determine which graphs are most similar, and which require more changes to transform one into the other. The set of graphs to be compared can be further specialized to provide more insight, e.g., using different time periods to explore events in a company life cycle.

  12. Using an Energy Performance Based Design-Build Process to Procure a Large Scale Low-Energy Building: Preprint

    SciTech Connect (OSTI)

    Pless, S.; Torcellini, P.; Shelton, D.

    2011-05-01

    This paper will review a procurement, acquisition, and contract process of a large-scale replicable net zero energy (ZEB) office building. The owners developed and implemented an energy performance based design-build process to procure a 220,000 ft2 office building with contractual requirements to meet demand side energy and LEED goals. We will outline the key procurement steps needed to ensure achievement of our energy efficiency and ZEB goals. The development of a clear and comprehensive Request for Proposals (RFP) that includes specific and measurable energy use intensity goals is critical to ensure energy goals are met in a cost effective manner. The RFP includes a contractual requirement to meet an absolute demand side energy use requirement of 25 kBtu/ft2, with specific calculation methods on what loads are included, how to normalize the energy goal based on increased space efficiency and data center allocation, specific plug loads and schedules, and calculation details on how to account for energy used from the campus hot and chilled water supply. Additional advantages of integrating energy requirements into this procurement process include leveraging the voluntary incentive program, which is a financial incentive based on how well the owner feels the design-build team is meeting the RFP goals.

  13. Procuring Stationary Fuel Cells For CHP: A Guide for Federal Facility Decision Makers

    SciTech Connect (OSTI)

    Stinton, David P; McGervey, Joseph; Curran, Scott

    2011-11-01

    Federal agency leaders are expressing growing interest in using innovative fuel cell combined heat and power (CHP) technology at their sites, motivated by both executive branch sustainability targets and a desire to lead by example in the transition to a clean energy economy. Fuel cell CHP can deliver reliable electricity and heat with 70% to 85% efficiency. Implementing this technology can be a high efficiency, clean energy solution for agencies striving to meet ambitious sustainability requirements with limited budgets. Fuel cell CHP systems can use natural gas or renewable fuels, such as biogas. Procuring Stationary Fuel Cells for CHP: A Guide for Federal Facility Decision Makers presents an overview of the process for planning and implementing a fuel cell CHP project in a concise, step-by-step format. This guide is designed to help agency leaders turn their interest in fuel cell technology into successful installations. This guide concentrates on larger (100 kW and greater) fuel cell CHP systems and does not consider other fuel cell applications such as cars, forklifts, backup power supplies or small generators (<100 kW). Because fuel cell technologies are rapidly evolving and have high up front costs, their deployment poses unique challenges. The electrical and thermal output of the CHP system must be integrated with the building s energy systems. Innovative financing mechanisms allow agencies to make a make versus buy decision to maximize savings. This guide outlines methods that federal agencies may use to procure fuel cell CHP systems with little or no capital investment. Each agency and division, however, has its own set of procurement procedures. This guide was written as a starting point, and it defers to the reader s set of rules if differences exist. The fuel cell industry is maturing, and project developers are gaining experience in working with federal agencies. Technology improvements, cost reductions, and experienced project developers are making fuel cell projects easier to put into service. In this environment, federal decision makers can focus on being smart buyers of fuel cell energy instead of attempting to become experts in fuel cell technology. For agencies that want to pursue a fuel cell CHP this guide presents a four step process for a successful project. 1. Perform a preliminary screening of the energy needs energy costs and incentives. 2. Compare a detailed project plan. 3. Make a financing and contracting decision. 4. Execute the project plan including financing, installation, and operation. The simplest procurement method is designated funding for the outright purchase of the fuel cell CHP system, although this is usually not the most cost-effective option. This guide describes the following financing options: Power purchase agreement Energy savings performance contract Utility energy services contract Enhanced use lease Fuel cell CHP technology can help federal facility managers comply with agency objectives for reducing energy consumption and air pollution emissions. Fuel cells do not generate particulate pollutants, unburned hydrocarbons or the gases that produce acid rain. Fuel cells emit less carbon dioxide (CO2) than other, less efficient technologies and use of renewable fuels can make them carbon neutral. Fuel cell CHP technology can deliver reliable electricity and heat with high efficiency (70% to 85%) in a small physical footprint with little noise, making it a cost-effective option for federal facilities.

  14. A guide to writing procurement specifications for new and existing CHAWS sites

    SciTech Connect (OSTI)

    Martins, S.A.; Fry, C.

    1991-09-01

    Turn-key Chemical Hazard Warning Systems (CHAWS) have been designed by the Lawrence Livermore National Laboratory (LLNL) and installed at a number of US Army sites. This document is intended to be used as a guide by those charged with writing procurement specification for both new and existing CHAWS sites. It discusses issues of system design and the functional requirements for both hardware and software. Suggestions are made for those interested in updating the computer platform and/or operating system used in older CHAWS designs. The topics of new-site installation and training are only briefly discussed. The reader is referred to the CHAWS User's Guides listed in the bibliography for user information. 5 refs., 1 tab.

  15. Benchmarking D and D procurement best practices at four commercial nuclear power plants.

    SciTech Connect (OSTI)

    Arflin, J.; Baker, G.; Bidwell, B.; Bugielski, D.; Cavanagh, J.; Sandlin, N.

    1998-11-06

    In conclusion, if the Department of Energy is going to achieve the strategic objectives of the world's largest environment clean-up of contaminated sites, then they are going to have to identify and implement leading edge thinking, practices and solutions. This report should serve not as the end of best practices, identification and implementation rather it creates a platform for a wide range of beginnings, and establishes a starting point for continuous improvement of DOE and contractor's processes, practices and initiatives to allow D&D to be performed safer, faster, better at reduced costs. The approaches identified in this report will come to life by being shared, debated, and implemented in the context of organizational realities. Then, where appropriate, they need to be used and improved upon. We encourage the procurement and technical communities to use this document to facilitate an on-going dialog.

  16. Novel procurement concepts utilized to award contract for vitrification of an F006 mixed waste sludge

    SciTech Connect (OSTI)

    Pickett, J.B.; Musall, J.C.; Hayes, A.F.; Campbell, E.E.

    1994-06-01

    A number of novel concepts were utilized in a procurement bid process to award a contract for the stabilization of a mixed wastewater treatment plating line sludge from the Reactor Materials department (M-Area) at the Savannah River site (SRS). The contract award was based on a combination of technical and cost considerations. The technical aspects included an evaluation of the technical validity of the proposed process(es) (i.e., would the process work?), the physical resources of the proposer and the expertise of the personnel proposed to work on the program, and prior experience of the firm wit treatment and stabilization of mixed (radioactive and hazardous) wastes. This paper will concentrate on the cost and the bid award considerations, rather than the technical aspects.

  17. Waiver of Mandatory Use of the Strategic Integrated Procurement Enterprise System (STRIPES) for GSA Global Supply Service Transactions

    Broader source: Energy.gov [DOE]

    Pursuant to Federal Acquisition Regulation (FAR) 8.402 (c)(1), orders placed through the General Service Administration (GSA) Global Supply System are not subject to FAR Subpart 8.4, Federal Supply Schedules. In addition, FAR 4.606 (c)(2) eliminates the requirement for orders from GSA Global Supply System be reported to the Federal Procurement Data System – Next Generation (FPDS-NG).

  18. Procuring Solar Energy: A Guide for Federal Facility Decision Makers, Solar Screening Evaluation Checklist, September 2010

    Broader source: Energy.gov [DOE]

    This guide presents an overview of the process for successfully planning for and installing solar technology on a federal site. It is specifically targeted to managers of federal buildings and sites, contracting officers, energy and sustainability officers, and regional procurement managers. The solar project process is outlined in a concise, easy-to-understand, step-by-step format. Information includes a brief overview of legislation and executive orders related to renewable energy and the compelling reasons for implementing a solar project on a federal site. It also includes how to assess a facility to identify the best solar installation site, project recommendations and considerations to help avoid unforeseen issues, and guidance on financing and contracting options. Case studies with descriptions of successful solar deployments across multiple agencies are presented. In addition, detailed information and sample documents for specific tasks are referenced with Web links or included in the appendixes. The guide concentrates on distributed solar generation and not large, centralized solar energy generation.

  19. Procuring Solar Energy: A Guide for Federal Facility Decision Makers, Appendix B, September 2010

    Broader source: Energy.gov [DOE]

    This guide presents an overview of the process for successfully planning for and installing solar technology on a federal site. It is specifically targeted to managers of federal buildings and sites, contracting officers, energy and sustainability officers, and regional procurement managers. The solar project process is outlined in a concise, easy-to-understand, step-by-step format. Information includes a brief overview of legislation and executive orders related to renewable energy and the compelling reasons for implementing a solar project on a federal site. It also includes how to assess a facility to identify the best solar installation site, project recommendations and considerations to help avoid unforeseen issues, and guidance on financing and contracting options. Case studies with descriptions of successful solar deployments across multiple agencies are presented. In addition, detailed information and sample documents for specific tasks are referenced with Web links or included in the appendixes. The guide concentrates on distributed solar generation and not large, centralized solar energy generation.

  20. Summary history of domestic uranium procurement under US Atomic Energy Commission contracts. Final report

    SciTech Connect (OSTI)

    Albrethsen, H. Jr.; McGinley, F.E.

    1982-09-01

    During the period 1947 through 1970, the Atomic Energy Commission (AEC) fostered the rapid development and expansion of the domestic uranium mining and milling industry by providing a market for uranium. Some thirty-two mills were constructed during that period to produce U/sub 3/O/sub 8/ concentrates for sale to the AEC. In addition, there were various pilot plants, concentrators, upgraders, heap leach, and solution mining facilities that operated during the period. The purpose of this report is to compile a short narrative history of the AEC's uranium concentrate procurement program and to describe briefly each of the operations that produced uranium for sale to the AEC. Contractual arrangements are described and data are given on quantities of U/sub 3/O/sub 8/ purchased and prices paid. Similar data are included for V/sub 2/O/sub 5/, where applicable. Mill and other plant operating data were also compiled from old AEC records. These latter data were provided by the companies, as a contractual requirement, during the period of operation under AEC contracts. Additionally, an effort was made to determine the present status of each facility by reference to other recently published reports. No sites were visited nor were the individual reports reviewed by the companies, many of which no longer exist. The authors relied almost entirely on published information for descriptions of facilities and milling processes utilized.

  1. Procuring Solar Energy: A Guide for Federal Facility Decision Makers, September 2010

    SciTech Connect (OSTI)

    Stoltenberg, B.; Partyka, E.

    2010-09-01

    This guide presents an overview of the process for successfully planning for and installing solar technology on a federal site. It is specifically targeted to managers of federal buildings and sites, contracting officers, energy and sustainability officers, and regional procurement managers. The solar project process is outlined in a concise, easy-to-understand, step-by-step format. Information includes a brief overview of legislation and executive orders related to renewable energy and the compelling reasons for implementing a solar project on a federal site. It also includes how to assess a facility to identify the best solar installation site, project recommendations and considerations to help avoid unforeseen issues, and guidance on financing and contracting options. Case studies with descriptions of successful solar deployments across multiple agencies are presented. In addition, detailed information and sample documents for specific tasks are referenced with Web links or included in the appendixes. The guide concentrates on distributed solar generation and not large, centralized solar energy generation.

  2. Assessment of the Potential to Achieve very Low Energy Use in Public Buildings in China with Advanced Window and Shading Systems

    SciTech Connect (OSTI)

    Lee, Eleanor; Pang, Xiufeng; McNeil, Andrew; Hoffmann, Sabine; Thanachareonkit, Anothai; Li, Zhengrong; Ding, Yong

    2015-05-29

    As rapid growth in the construction industry continues to occur in China, the increased demand for a higher standard living is driving significant growth in energy use and demand across the country. Building codes and standards have been implemented to head off this trend, tightening prescriptive requirements for fenestration component measures using methods similar to the U.S. model energy code American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE) 90.1. The objective of this study is to (a) provide an overview of applicable code requirements and current efforts within China to enable characterization and comparison of window and shading products, and (b) quantify the load reduction and energy savings potential of several key advanced window and shading systems, given the divergent views on how space conditioning requirements will be met in the future. System-level heating and cooling loads and energy use performance were evaluated for a code-compliant large office building using the EnergyPlus building energy simulation program. Commercially-available, highly-insulating, low-emittance windows were found to produce 24%–66% lower perimeter zone HVAC electricity use compared to the mandated energy-efficiency standard in force (GB 50189-2005) in cold climates like Beijing. Low-e windows with operable exterior shading produced up to 30%–80% reductions in perimeter zone HVAC electricity use in Beijing and 18%–38% reductions in Shanghai compared to the standard. The economic context of China is unique since the cost of labor and materials for the building industry is so low. Broad deployment of these commercially available technologies with the proper supporting infrastructure for design, specification, and verification in the field would enable significant reductions in energy use and greenhouse gas emissions in the near term.

  3. Assessment of the Potential to Achieve very Low Energy Use in Public Buildings in China with Advanced Window and Shading Systems

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Lee, Eleanor; Pang, Xiufeng; McNeil, Andrew; Hoffmann, Sabine; Thanachareonkit, Anothai; Li, Zhengrong; Ding, Yong

    2015-05-29

    As rapid growth in the construction industry continues to occur in China, the increased demand for a higher standard living is driving significant growth in energy use and demand across the country. Building codes and standards have been implemented to head off this trend, tightening prescriptive requirements for fenestration component measures using methods similar to the U.S. model energy code American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE) 90.1. The objective of this study is to (a) provide an overview of applicable code requirements and current efforts within China to enable characterization and comparison of window and shading products,more » and (b) quantify the load reduction and energy savings potential of several key advanced window and shading systems, given the divergent views on how space conditioning requirements will be met in the future. System-level heating and cooling loads and energy use performance were evaluated for a code-compliant large office building using the EnergyPlus building energy simulation program. Commercially-available, highly-insulating, low-emittance windows were found to produce 24%–66% lower perimeter zone HVAC electricity use compared to the mandated energy-efficiency standard in force (GB 50189-2005) in cold climates like Beijing. Low-e windows with operable exterior shading produced up to 30%–80% reductions in perimeter zone HVAC electricity use in Beijing and 18%–38% reductions in Shanghai compared to the standard. The economic context of China is unique since the cost of labor and materials for the building industry is so low. Broad deployment of these commercially available technologies with the proper supporting infrastructure for design, specification, and verification in the field would enable significant reductions in energy use and greenhouse gas emissions in the near term.« less

  4. DOE Releases Request for Information for the West Valley Demonstration Project Technical Services to Develop a Supplemental Environmental Impact Statement Procurement

    Broader source: Energy.gov [DOE]

    Cincinnati -- The U.S. Department of Energy (DOE) today issued a Request for Information (RFI) seeking to solicit input via capability statements from interested parties with the specialized capabilities necessary to meet the requirements of the Draft Performance Work Statement (PWS) for the West Valley Demonstration Project Technical Services to develop a Supplemental Environmental Impact Statement Procurement

  5. Procurement of State-of-the-Art Research Equipment to Support Faculty Members Within the RNAi Therapeutics Institute

    SciTech Connect (OSTI)

    Terence Flotte, MD; Patricia McNulty

    2010-06-29

    This project funded the procurement of state-of-the-art research equipment to support world class faculty members within the RNAi Therapeutics Institute, a central program of the Advanced Therapeutics Cluster (ATC) project. The equipment purchased under this grant supports the RNA Therapeutics Institute (RTI) at the University of Massachusetts Medical School which seeks to build a community of scientists passionate about RNA. By uniting researchers studying the fundamental biology and mechanisms of cellular RNAs with those working to devise human therapies using or targeting nucleic acids, the RTI represents a new model for scientific exploration. By interweaving basic and applied nucleic acid scientists with clinicians dedicated to finding new cures, our goal is to create a new paradigm for organizing molecular research that enables the rapid application of new biological discoveries to solutions for unmet challenges in human health.

  6. NERSC-8 Procurement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Programming models File Storage and I/O Edison PDSF Genepool Testbeds Retired Systems Storage & File Systems Data & Analytics Connecting to NERSC Queues and Scheduling Job Logs & Statistics Application Performance Training & Tutorials Software Policies User Surveys NERSC Users Group User Announcements Help Staff Blogs Request Repository Mailing List Operations for: Passwords & Off-Hours Status 1-800-66-NERSC, option 1 or 510-486-6821 Account Support https://nim.nersc.gov

  7. WIPP Opportunities -CBFO Procurement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    For additional posting information, please visit the Department of Energy's Environmental Management Consolidated Business Center site, located at http:www.emcbc.doe.gov...

  8. TO: Procurement Directors

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    property; provided protocols for foreign transactions (loans, transfers, ... The revision also removed outdated and conflicting language. DOE O 580.1A was also ...

  9. TO: FROM: Procurement Directors

    Office of Environmental Management (EM)

    and Ground Domestic Delivery Services (DDS2) in the continental United States, Alaska, Hawaii, and Puerto Rico. DDS2 is a full service Federal Strategic Sourcing Initiative (FSSI)...

  10. Russian Contract Procurement Document

    SciTech Connect (OSTI)

    Tobin, J G

    2010-03-29

    This contract supports the enhancement of physical protection or nuclear material control and accounting systems at institutes or enterprises of the newly independent states under the material protection control and accounting (MPC&A) program. The contract is entered into pursuant to the MPC&A Program, a gratuitous technical assistance program, in accordance with the bilateral Agreements between the Russian Federation and the United States of America concerning the Safe and Secure Transportation, Storage and Destruction of Weapons and the Prevention of Weapons Proliferation of June 1992, as extended and amended by Protocol signed of June 1999, Agreement between the Government of the Russian Federation regarding Cooperation in the Area of Nuclear Materials Physical Protection, Control and Accounting of October 1999 and the Russian Federation law of May 1999 on the taxation exemption of gratuitous technical assistance with Russian Federation under registration No.DOE001000.

  11. Clean Energy Procurement

    Broader source: Energy.gov [DOE]

    Subsequently, in 2009, the state embarked upon an initiative with the University System of Maryland, termed "Clean Energy Horizons," to contract for renewable energy through long-term power...

  12. Procurement Data Reporting

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    References: DOE O 540.1B, AL 2010-03, AL 2011-30, Cancellation Notice I. Overview This ... processed outside of STRIPES. This Guide Chapter does not apply to instrument numbers ...

  13. Procurement Forms | NREL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Proposal Form National Environmental Policy Act (NEPA) Checklist NEPA Checklist - Instruction and Preparation NREL Request for ACH Banking Information NREL Request for...

  14. TO: Procurement Directors

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Assistance Policy, Office of Acquisition and Project Management SUBJECT: ... The revision also removed outdated and conflicting language. DOE O 580.1A was also ...

  15. Products, Services: Not Procurable

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Furrier Physicians Amusements Gaming Produce ArtArtists Gift Shops Public Relations Art Galleries Glass Company Recreation Arts & Crafts GrocersGroceries Relocation Services...

  16. Advanced Window and Shading Technologies

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... through demonstrated use of ISO-compliant modeling tools in ... compared to GB50189-2005 code. A * Ultra-low energy use ... DGJ08-107-20 Shanghai Standard 9 Field testing: ...

  17. FPDS-NG National Interest Action (NIA) Code to Track Procurement Actions Made in Support of the Pacific Earthquake and Tsunami

    Broader source: Energy.gov [DOE]

    The purpose of this Policy Flash is to advise Contracting Officers of the establishment of a new National Interest Action (NIA) Code to track procurement actions made in support of the Pacific Earthquake and Tsunami. As explained below, this action does not trigger or otherwise authorize agencies to use any Emergency Acquisition Flexibilities in Federal Acquisition Regulation (FAR) 18.2. Effective immediately, procurement actions in direct response to the Pacific earthquake and tsunami should be reported in FPDS-NG using the NIA code "Pacific Earthquake/Tsunami 2011." The NIA value for Pacific Earthquake and Tsunami is currently valid from March 11, 2011, to September 12, 2011. Since responses to this incident may be conducted inside or outside the United States, Contracting Officers should ensure that "Place of Performance" data accurately reflects where the work will be performed. Note: This NIA Code should be used only to facilitate cost collection and reporting. Use of this NIA Code does not authorize or justify use of any Emergency Acquisition Flexibilities in FAR 18.2. However, the acquisition flexibilities described in FAR 18.1 may be available, as well as others in agency acquisition supplements, to support the response to the Pacific Earthquake and Tsunami.

  18. TO: Procurement Directors FROM: Office of Procurement and Assistance...

    Broader source: Energy.gov (indexed) [DOE]

    flashes.htm Questions relating to the Guide Chapter may be directed to Mr. Kevin M. Smith at (202) 287-1614, or kevin.m.smith@,hq.doe.gov. Michael P. Fischetti, Duector Office...

  19. WIPP Opportunities - Procurement - Sources Sought

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Subcontractor Safety Safety Rules for Subcontractors Job Hazard Analysis 851 Rule Worker Safety and Health Program Description Integrated Safety Management System Description Occupational Health Program Electrical Safety Program Manual NWP QA Video for Subcontractors

  20. Procurement Integrity | Department of Energy

    Energy Savers [EERE]

    Press Releases Press Releases RSS April 14, 2016 Department of Homeland Security's Science & Technology Directorate Announces New Cybersecurity Risk Analysis Tool on the Commercial Market The Department of Homeland Security (DHS) Science and Technology Directorate (S&T) announced that a fifth cybersecurity technology has been licensed for commercialization as a part of the Cyber Security Division's Transition to Practice (TTP) program, thanks to a new tool developed by researchers at the

  1. Graded quality assurance in procurement

    SciTech Connect (OSTI)

    Fan, D.C.

    1995-12-31

    The Code of Federal Regulations, Part 50, Appendix B, requires every applicant for an operating license to include in its final safety analysis report information pertaining to the managerial and administrative controls to be used to ensure safe operation. This appendix establishes quality assurance requirements for the design, construction, and operation of those structures, systems, and components (SSC) that perform safety-related functions. The activities affecting safety-related SSC functions include designing, purchasing, fabricating, and so forth, Title 10 CFR 50.65 established requirements to ensure that the maintenance activities conducted by licensees are effective. This is also known as the maintenance rule.

  2. Recent procurements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... More information is available at https:www.emcbc.doe.govSEBICPCOREdraftrfppage.php. Addthis Related Articles DOE Issues Final Request for Proposal for Oak Ridge Transuranic ...

  3. Contracts & Procurements - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    » Contracting for Support Services Contracting for Support Services What you need to know as a Federal Employee The Department of Energy, like most Federal agencies, spends a significant amount of its contracting budget on support services. While these contracts fulfill continuing and essential needs of the Department, this type of contracting arrangement can present unique situations that require special diligence on the part of Federal employees to ensure that applicable statutes,

  4. Pressurized fluidized-bed hydroretorting of eastern oil shales. Volume 4, Task 5, Operation of PFH on beneficiated shale, Task 6, Environmental data and mitigation analyses and Task 7, Sample procurement, preparation, and characterization: Final report, September 1987--May 1991

    SciTech Connect (OSTI)

    Not Available

    1992-03-01

    The objective of Task 5 (Operation of Pressurized Fluidized-Bed Hydro-Retorting (PFH) on Beneficiated Shale) was to modify the PFH process to facilitate its use for fine-sized, beneficiated Eastern shales. This task was divided into 3 subtasks: Non-Reactive Testing, Reactive Testing, and Data Analysis and Correlations. The potential environment impacts of PFH processing of oil shale must be assessed throughout the development program to ensure that the appropriate technologies are in place to mitigate any adverse effects. The overall objectives of Task 6 (Environmental Data and Mitigation Analyses) were to obtain environmental data relating to PFH and shale beneficiation and to analyze the potential environmental impacts of the integrated PFH process. The task was divided into the following four subtasks. Characterization of Processed Shales (IGT), 6.2. Water Availability and Treatment Studies, 6.3. Heavy Metals Removal and 6.4. PFH Systems Analysis. The objective of Task 7 (Sample Procurement, Preparation, and Characterization) was to procure, prepare, and characterize raw and beneficiated bulk samples of Eastern oil shale for all of the experimental tasks in the program. Accomplishments for these tasks are presented.

  5. Landscaping for Shade | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    best, as they require little maintenance once established and avoid the dangers of invasive species. To find the best choices for your area, visit the Plantnative website....

  6. Landscaping for Shade | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    roots and stronger branches, they are less prone to breakage by windstorms or heavy snow loads. Slow-growing trees can also be more drought resistant than fast-growing trees....

  7. Carpe Diem: Install Insulated Roman Shades

    Broader source: Energy.gov [DOE]

    As I mentioned in yesterday's blog, I had insulated window quilts installed on most of my home's windows.

  8. Engineering Camp Puts STEAM Roller in Motion |GE Global Research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Engineering Institute Exposes Young Girls to Engineering Fields Click to email this to a friend (Opens in new window) Share on Facebook (Opens in new window) Click to share (Opens in new window) Click to share on LinkedIn (Opens in new window) Click to share on Tumblr (Opens in new window) Engineering Institute Exposes Young Girls to Engineering Fields Cheryl Sabourin 2014.08.13 GE Global Research recently hosted 30 middle schools students from the Niskayuna Engineering Institute for Young

  9. Gearbox Reliability Collaborative High Speed Shaft Tapered Roller Bearing Calibration

    SciTech Connect (OSTI)

    Keller, J.; Guo, Y.; McNiff, B.

    2013-10-01

    The National Renewable Energy Laboratory (NREL) Gearbox Reliability Collaborative (GRC) is a project investigating gearbox reliability primarily through testing and modeling. Previous dynamometer testing focused upon acquiring measurements in the planetary section of the test gearbox. Prior to these tests, the strain gages installed on the planetary bearings were calibrated in a load frame.

  10. MHK Technologies/Wave Roller | Open Energy Information

    Open Energy Info (EERE)

    converted to electricity by a closed hydraulic system in combination with a hydraulic motorgenerator system. Upgrade to No3 is more powerful hyraulic componets. Technology...

  11. Procurement Director | Princeton Plasma Physics Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Advanced degree and JD preferred. Experience working with cost-type (cost reimbursable, time-and-material (T&M), and labor-hour), fixed-price and incentive-type subcontracts or...

  12. Memorandum for Chief Acquisition Officers, Senior Procurement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ...www.fms.treas.gov.tfm.voll07-03.pdf). 2 I. Background What is ... to appropriate contract clauses addressing ... Agency, including its independent cost estimate, if one ...

  13. TO: Procurement Directors/Contracting Officers FROM: ...

    Office of Environmental Management (EM)

    without taking steps to independently verify them. DOE Contracting Officers (COs) are reminded that DOE Order 481.1C, Work for Others (Non-DOE Funded Work) assigns...

  14. Sandia National Laboratories: Working with Sandia: Procurement:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Construction and Facilities Construction and Facilities iSupplier Account Accounts Payable Contract Information Construction and Facilities Contract Audit Working with Sandia Construction and Facilities Sandia establishes contracts to support design and construction, including contracts for leased space, decontamination and demolition work, and infrastructure maintenance. AE & Construction Partnerships Design Management Partnerships Error/Omission Process (PDF) Sandia completes

  15. TO: Procurement Directors Heads of Contracting Activities

    Energy Savers [EERE]

    Finish Line | Department of Energy THURSDAY: Secretary Chu Welcomes Students and Tours Vehicles at EcoCAR's Finish Line THURSDAY: Secretary Chu Welcomes Students and Tours Vehicles at EcoCAR's Finish Line June 15, 2011 - 12:00am Addthis Washington, D.C. - On Thursday, June 16, 2011, Energy Secretary Steven Chu will welcome the sponsors and 16 student teams participating in EcoCAR: the NeXt Challenge, a three-year collegiate student engineering competition that focuses on advanced vehicle

  16. Historical Procurement Information | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Information Transportation and Warehousing Leasing and Real Estate Professional, ... Estate - Historical View.pdf PDF icon Professional, Scientific, Technical - Historical ...

  17. Procurement Standards Lead-by-Example Resources

    Broader source: Energy.gov [DOE]

    State and local governments can lead by example by promoting energy efficiency programs and policies for public facilities, equipment, and government operations.

  18. Office of Headquarters Procurement Services - Employee Customer...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to appropriate staff; * Two-way communication; * Opportunities for collaboration and ... including centralized collection of written recommendations for improvement andor ...

  19. TO: Procurement Directors FROM: Director, Policy Division

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    past performance information. There has also been two other important changes worth noting: 1. OFPP added some additional steps in gathering, evaluating, and sharing past...

  20. First Energy Ohio- Renewable Energy Credit Procurements

    Broader source: Energy.gov [DOE]

    As part of its Electric Security Plan, FirstEnergy will periodically solicit proposals for Renewable Energy Credits (RECs) and Solar Renewable Energy Credits (SRECs). Proposals are accepted for b...

  1. Cybersecurity Procurement Language for Energy Delivery Systems

    Energy Savers [EERE]

    ... iii 5.1 Physical Access to Energy Delivery System Components ... and Method Establishment, Usage, and Update ... * Comparison to a library of forbidden strings * ...

  2. PIA - Industry Interactive Procurement System (IIPS) | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Registration, PIA, Idaho National Laboratory Occupational Medical Surveillance System (OMSS) PIA, Idaho National Laboratory PIA - Bonneville Power Adminstration Ethics Helpline

  3. TO: Procurement Directors FROM: Director, Policy Division

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Please ensure the applicable clauses are included in all contracts subject to SCR Requirements. Please pay particular attention to the paragraph entitled "Contracting Officer ...

  4. Sandia National Laboratories: Working with Sandia : Procurement...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Accounts Payable Opportunities Potential Suppliers Current Suppliers Accounts Payable Invoice Processing E-invoice Contract Audit ContractorBidder Information Construction and...

  5. Sandia National Laboratories: Working with Sandia: Procurement...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    IT Transformation Services Opportunities Potential Suppliers Current Suppliers Accounts Payable Contract Audit ContractorBidder Information Construction and Facilities iSupplier...

  6. Sandia National Laboratories: Working with Sandia: Procurement...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Prop & Direct Change Attachments (MS Word) Posters Equal Employment Opportunity Davis-Bacon Wage Poster State DBA Poster Requirements (MS Excel) Safety The construction community...

  7. Whole Building Performance-Based Procurement Training

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... I saw the integration at RSF, the total comprehensive thinking, and thought, 'I've got to ... NA NA 330,000 10 14 | Building Technologies Office eere.energy.gov Project Integration...

  8. Cybersecurity Procurement Language for Energy Delivery Systems

    Energy Savers [EERE]

    Cybersecurity Is Every Citizen's Responsibility Cybersecurity Is Every Citizen's Responsibility October 30, 2013 - 3:06pm Addthis Cybersecurity Is Every Citizen's Responsibility Daniel B. Poneman Daniel B. Poneman Former Deputy Secretary of Energy What are the key facts? October is National Cybersecurity Awareness Month. Learn simple steps you can take to increase your cybersecurity at work and at home. To learn more, join the Cyber Innovation Technology Summit, livestreaming on energy.gov/live

  9. TO: Procurement Directors FROM: Director, Policy Division

    Energy Savers [EERE]

    holders to go to www.FedConnect.net to locate the RFQ. A sample page is in the STRIPES Library, look for "ACQ e-Buy Template". A vertical line on pages 15 and 16 in the right...

  10. TO: Procurement Directors Heads of Contracting Activities

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Finally, non-substantive editorial changes are being made where appropriate. Contracting Officers must take appropriate actions, including bilaterally modifying existing contracts, ...

  11. Oak Ridge Associated Universities Procurement Questionnaire Applicatio...

    Energy Savers [EERE]

    Medical Surveillance System (OMSS) PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory Occupational Injury & Illness System...

  12. Energy Star Procurement Requirement for Agencies

    Broader source: Energy.gov [DOE]

    SB 2300 was enacted June 25, 2009 and later codified into law. It requires future office equipment, appliances, lighting, and heating and cooling products and systems purchased by and for the state...

  13. Sandia National Laboratories: Working with Sandia: Procurement...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    one 2-year option period. Science Applications International Corporation (SAIC) 2440 Alamo Ave SE, Ste 100, Albuquerque, NM 87106 Phone: 505-259-9011 Contract for Mission...

  14. DOE Procurement Community Resources | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Acquisition Career Management Order Handbook Contract Human Resource Management Cost Study Manual & Value Study Desk Manual Small Business FY15 DOE Final Goal Letter - DOE-SBA MOU ...

  15. Sandia National Laboratories: Working with Sandia: Procurement...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Technology Partnerships Economic Impact Facebook Twitter YouTube Flickr RSS Top Small Business Opportunities Potential Suppliers Become a Supplier Small Business Small Business...

  16. http://www.ornl.gov/Procurement.PDF

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    893 1. All Grade 5 and Grade 8 fasteners of foreign origin which do not bear any manufacturer's headmarks: Grade 5 Grade 8 2. Grade 5 fasteners with the following manufacturers'...

  17. Retiring Procurement Official Reflects on Career

    Broader source: Energy.gov [DOE]

    LEXINGTON, Ky. – As the retiring supervisory contracting officer for EM’s Portsmouth/Paducah Project Office (PPPO), Pamela Thompson exemplifies the wisdom of her own advice.

  18. TO: Procurement Directors Heads of Contracting Activities

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Expenditures of DOE Awards in relation to the financial statements (if ... of Expenditures of DOE Awards in relation to the financial statements as a whole ...

  19. Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management

    Broader source: Energy.gov [DOE]

    Guidance on Manufactured Goods and Substantial Transformation for Financial Assistance Awards under the Buy American Provisions of the American Recovery and Reinvestment Act of 2009 (Section 1605 of Pub. L. 1 1 1-5).

  20. Highly Insulating Residential Windows Using Smart Automated Shading

    Broader source: Energy.gov [DOE]

    Lead Performer: Lawrence Berkeley National Laboratory - Berkeley, CA Partner: Pella Windows - Pella, IA

  1. Highly Insulating Residential Windows Using Smart Automated Shading...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Learn more Video: Architecture, Engineering, and Construction (AEC) Hackathon PDF icon 2014 BTO Peer Review Presentation - Highly Insulating Residential Windows using Smart ...

  2. Advanced Window and Shading Technologies | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lead Performer: Lawrence Berkeley National Laboratory - Berkeley, CA Partners: -- Saint-Gobain - Valley Forge, PA -- Sage Electrochromics - Faribault, MN -- Dow Chemical - Midland, ...

  3. Microenvironmental Control and Thermal Barrier Curtains/Shades for

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    inertial sensor Title: Microelectromechanical inertial sensor A microelectromechanical (MEM) inertial sensor is disclosed which can be used to sense a linear acceleration, or a Coriolis acceleration due to an angular rotation rate, or both. The MEM inertial sensor has a proof mass which is supported on a bridge extending across an opening through a substrate, with the proof mass being balanced on the bridge by a pivot, or suspended from the bridge by the pivot. The proof mass can be oscillated

  4. Solar Easement and the Solar Shade Control Act

    Broader source: Energy.gov [DOE]

    SB 1399 of 2008 amended the Public Resources Code to exempt trees and shrubs planted prior to the installation of a solar system. Also exempted are trees and shrubs that are subject to a local...

  5. NDIA PMSC ANSI/EIA 748 Intent Guide

    Office of Environmental Management (EM)

    National Defense Industrial Association (NDIA) Program Management Systems Committee (PMSC) Earned Value Management Systems Intent Guide November 2006 Edition © NDIA PMSC Earned Value Management Systems Intent Guide August 2006 Edition. This document may not be reprinted without permission. For permission to reprint, please contact NDIA Procurement Director Ruth Franklin at rfranklin@ndia.org. ANSI EIA-748-A guidelines that are shaded in grey within document are reprinted with permission. These

  6. TO: Procurement Directors FROM: Director, Contract and Financial...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FROM: Director, Contract and Financial Assistance Policy Division Office of Acquisition and Project Management SUBJECT: Implementation of Indian Energy Preference Provision ...

  7. TO: Procurement Directors FROM: Director Contract and Financial...

    Office of Environmental Management (EM)

    such as those covered by FAR 52.222-26 (Equal Opportunity), FAR 52.222-35 (Equal Opportunity for Veterans), and FAR 52.222-36 (Affirmative Action for Workers With Disabilities)...

  8. Sandia National Laboratories: Working with Sandia : Procurement: Contract

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Audit: Invoice Processing Invoice Processing Review process Invoices are reviewed for compliance with contract terms and conditions before payment. If the accounts payable system does not reflect receipt or if other discrepancies exist, approval for payment is requested from the Sandia individual (requestor) who established the contract. The requestor may instruct Accounts Payable to pay, reject, or reduce the invoice. Rejected or reduced invoices Accounts Payable processors may reject or

  9. Sandia National Laboratories: Working with Sandia: Procurement: Contract

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Audit: E-invoice Overview E-invoice Overview E-invoice is completely paperless and reduces cycle time by eliminating physical mail. Participation is highly encouraged and provides the following benefits: Faster, more reliable invoice submittal Faster payment, reduced cycle time Online payment status Security of invoice/payment detail Ability to get paid early if select Dynamic Discount Payment Terms E-invoice facilitates Sandia's mission to provide efficient stewardship of taxpayer

  10. TO: Procurement Directors FROM: Director, Contract and Financial...

    Energy Savers [EERE]

    FROM: Director, Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Electronic Products Environmental...

  11. TO: Procurement Directors FROM: Director, Contract and Financial...

    Broader source: Energy.gov (indexed) [DOE]

    FROM: Director, Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: ENERGY STAR and Electronic Products...

  12. Policy Flash 2014-06 Affirmative procurement of biobased products...

    Broader source: Energy.gov (indexed) [DOE]

    Sharon Archer of the Contract and Financial Assistance Policy Division, Office of Policy, Office of Acquisition and Project Management at (202) 287-1739 or at sharon.archer@hq.doe....

  13. TO: Procurement Directors/Contracting Officers FROM: Director

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the following website: http:www.management.energy.govpolicyguidancepolicyflash es.htm. Questions concerning this policy flash should be directed to A. Scott Geary, of the...

  14. TO: Procurement Directors/Contracting Officers FROM: Director

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the following website: http:www.management.energy.govpolicyguidancepolicyflashes.htm. Questions concerning this policy flash should be directed to Mike Dombrowski, of the...

  15. TO: Procurement Directors/Contracting Officers FROM: Director

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the following website: http:www.management.energy.govpolicyguidancepolicyflashes.htm. Questions concerning this policy flash should be directed to Carol Jenkins, of the...

  16. DOE Head of Contracting Activity and Procurement Directors' Directory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Other DOE HCA List May 26 2015.pdf More Documents & Publications Chapter 1 - Acquisition Regulations System DOE Site Facility Management Contracts Internet Posting High Risk Plan

  17. Update on Procurement Opportunities and Acquisition Process | Department of

    Office of Environmental Management (EM)

    Energy Unconventional Resources Technology Advisory Committee Unconventional Resources Technology Advisory Committee The Unconventional Resources Technology Advisory Committee advises DOE on its research in unconventional oil and natural gas resources, such as shale gas. The Unconventional Resources Technology Advisory Committee advises DOE on its research in unconventional oil and natural gas resources, such as shale gas. Mission The Secretary of Energy, in response to provisions of

  18. THE CRITICAL FEW 2015 FEDERAL PROCUREMENT OFFICE PERFORMANCE METRICS

    Energy Savers [EERE]

    SEPTEMBER 16, 2015 TEAM CUMBERLAND MEETING - SEPTEMBER 16, 2015 Team Cumberland Meeting was held on September 16, 2015 at The Inn at Opryland in Nashville, Tennessee. DOCUMENTS AVAILABLE FOR DOWNLOAD PDF icon Team Cumberland Agenda, Sept 16, 2015 PDF icon Water Management Environmental Restrictions PDF icon Generation Outages Scheduling Impact PDF icon Hydropower Optimization PDF icon Customer Funding Progress Report PDF icon Old Hickory Rehabilitation Analysis PDF icon Wolf Creek Rehabilitation

  19. TO: Procurement Directors FROM: Director, Contract and Financial...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Recent State Initiatives on "Recreational" Marijuana use SUMMARY: A number of states have recently passed initiatives that permit the use of marijuana for "recreational" purposes. ...

  20. Policy Flash 2013-65 Procurement Evaluation & Re-Engineering...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    policy flash should be directed to Mike Larson of the Office of Acquisition and Project Management, Strategic Programs Division at (202) 287-1426 or at Michael.Larson@hq.doe.gov. ...

  1. TO: Procurement Directors FROM: Director Contract and Financial...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    policy flash should be directed to Mike Larson of the Office of Acquisition and Project Management, Strategic Programs Division at (202) 287-1426 or at Michael.Larson@hq.doe.gov.

  2. Phase I - Resource Procurement and Identification | Open Energy...

    Open Energy Info (EERE)

    time of reporting and further indicate the presence of a commercially viable geothermal reservoir. 2. Transmission Development Criteria For a project to be considered a Phase I...

  3. Procuring Solar Energy: A Guide for Federal Facility Decision...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    81 Solar Screening Evaluation Checklist This is a checklist to review the adequacy and quality of a given solar screening and to determine if a more detailed screening needs to be ...

  4. Procuring Solar Energy: A Guide for Federal Facility Decision...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    77 Self-Guided Solar Screening A preliminary solar energy site screening provides a rough estimate of the solar resource, energy production, and cost of a PV system. It also ...

  5. THE CRITICAL FEW 2015 FEDERAL PROCUREMENT OFFICE PERFORMANCE...

    Broader source: Energy.gov (indexed) [DOE]

    eligible for closeout, as of the end of the reporting period Average age of contract instruments eligible for closeout as of the end of the reporting period, calculated as ...

  6. TO: Procurement Directors FROM: Director, Contract and Financial...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to Jason Taylor of the Contract and Financial Assistance Policy Division, Office of Policy, Office of Acquisition and Project Management at (202) 287-1945 or at jason.taylor...

  7. TO: Procurement Directors/Contracting Officers FROM: Director

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Questions concerning this policy flash should be directed to Jason Taylor, of the Contract and Financial Assistance Policy Division at (202) 287-1560 or at Jason.Taylor@hq.doe.gov

  8. TO: Procurement Directors FROM: Director Office of Policy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to Jason Taylor of the Contract and Financial Assistance Policy Division, Office of Policy, Office of Acquisition and Project Management at (202) 287-1560 or at jason.taylor...

  9. TO: Procurement Directors FROM: Director Contract and Financial...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to Jason Taylor of the Contract and Financial Assistance Policy Division, Office of Policy, Office of Acquisition and Project Management at (202) 287-1945 or at jason.taylor...

  10. TO: Procurement Directors FROM: Director, Contract and Financial...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to Jason Taylor of the Contract and Financial Assistance Policy Division, Office of Policy, Office of Acquisition and Project Management at (202) 287-1560 or at jason.taylor

  11. TO: Procurement Directors FROM: Director Contract and Financial...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guidance for tracking inquiries related to the licensing of inventions developed at DOE facilities SUMMARY: The attached memorandum provides guidance for tracking inquiries ...

  12. TO: Procurement Directors/Contracting Officers FROM: Director

    Office of Environmental Management (EM)

    policy flash should be directed to Mike Larson of the Office of Acquisition and Project Management, Strategic Programs Division at (202) 287-1426 or at Michael.Larson@hq.doe.gov.

  13. Tensile and toughness assessment of the procured advanced alloys

    SciTech Connect (OSTI)

    Tan, Lizhen; Sokolov, Mikhail A.; Hoelzer, David T.; Busby, Jeremy T.

    2015-09-11

    Life extension of the existing nuclear reactors imposes irradiation of high fluences to structural materials, resulting in significant challenges to the traditional reactor materials such as type 304 and 316 stainless steels. Advanced alloys with superior radiation resistance will increase safety margins, design flexibility, and economics for not only the life extension of the existing fleet but also new builds with advanced reactor designs. The Electric Power Research Institute (EPRI) teamed up with Department of Energy (DOE) to initiate the Advanced Radiation Resistant Materials (ARRM) program, aiming to develop and test degradation resistant alloys from current commercial alloy specifications by 2021 to a new advanced alloy with superior degradation resistance by 2024 in light water reactor (LWR)-relevant environments

  14. TO: Procurement Directors/Contracting Officers FROM: Director

    Broader source: Energy.gov (indexed) [DOE]

    Acquisition Regulation Clause Usage Guide SUMMARY: The subject matrix contained an error related to the solicitation provision at FAR 52.209-5. That provision was identified...

  15. TO: Procurement Directors FROM: Director, Contract and Financial...

    Office of Environmental Management (EM)

    report of their biobased purchases by October 31 in the System for Award Management (SAM) located at www.sam.gov. To increase reporting compliance, please advise your...

  16. Chronological History of Federal Energy-Efficient Product Procurement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    10 CFR Part 436, June 19, 2007 Final Rule, Federal Register, 74 FR 10830, 10 CFR Part 436, March 13, 2009 Sample Contract Language for Construction Using Energy-Efficient Products

  17. Y-12 National Security Complex recognized for outstanding procurement...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the highest savings rate for fiscal year 2013 in the NNSA complex. At the Supply Chain Management Center biannual operational meeting in April, NNSA presented Y-12...

  18. Y-12 recognized for procurement efficiency | Y-12 National Security...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    display the awards Y-12 received. The National Nuclear Security Administration's Supply Chain Management Center recently presented Y-12 with an award for having the highest...

  19. TO: Procurement Directors/Contracting Officers FROM: Director

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Policy Office of Acquisition and Project Management SUBJECT: Determination of Benchmark Compensation Amount for Certain Executives and Employees (Update) SUMMARY: The...

  20. TO: Procurement Directors FROM: Director Contract and Financial...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Policy Office of Acquisition and Project Management SUBJECT: Acquisition Letter 07 - Benchmark Compensation Amount for Individual Executive Salary Actions SUMMARY: The purpose of...

  1. OfficeGovernmentEthicsGuidanceEthicsandProcurementIntegrity.pdf

    Energy Savers [EERE]

  2. Powering Up the Women's Procurement Program Presenters: Ann Sullivan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Support Services 5413 Architectural, Engineering & Related Services 5616 Investigation ... to Building and Dwellings 7223 Special Food Services 6116 Other Schools and ...

  3. Chemical Pre‐Procurement (ChemPro) Application

    Office of Energy Efficiency and Renewable Energy (EERE)

    Presenter: Julie Cordero, PE, CFEI Fire Protection Engineer, Sandia National Laboratory ‐ Albuquerque

  4. TO: Procurement Directors FROM: Director Contract and Financial...

    Broader source: Energy.gov (indexed) [DOE]

    A problem has been identified with completing the awardee share fields on the FAADSFAADS Plus reporting screen in STRIPES. Data quality is an area of major focus especially for...

  5. TO: Procurement Directors/Contracting Officers FROM: Director

    Office of Environmental Management (EM)

    office-managementoperational- managementprocurement-and-acquisitionpolicy-flashes. Questions concerning this policy flash should be directed to Jason Taylor, of the...

  6. TO: Procurement Directors FROM: Director, Contract and Financial...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... The Contract Writing systems shall use the code "H13S" when creatingupdating documents ... 04292013. If you have any questions or problems, please contact the FPDS NG-Change ...

  7. TO: Procurement Directors FROM: Director Contract and Financial...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    savings. * If a credit card is issued as part of the agreement under the NNSA Supply Chain Management Center (SCMC) or other programs use a corporate credit card and it applies...

  8. TO: Procurement Directors/Contracting Officers FROM: Director

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Acquisition and Project Management SUBJECT: Federal Acquisition Circular (FAC) 2005-68 SUMMARY: Attached for your information is a list of Federal Acquisition Regulation (FAR) ...

  9. NNSA Announces Procurement of Penguin Computing Clusters to Support...

    National Nuclear Security Administration (NNSA)

    safety, security and reliability of the nation's aging nuclear deterrent without testing. ... to ensuring the safety security and reliability of the nuclear weapons in the stockpile ...

  10. TO: Procurement Directors/Contracting Officers FROM: Director

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Officers verify the status of inclusion of the current DPO Order in all ... the results of their review of inclusion of the DPO Order in contracts, as well ...

  11. TO: Procurement Directors/Contracting Officers FROM: Director

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    In addition, new cost- reimbursement contractors are not being considered for inclusion into the Program. Enclosed is a Memorandum encouraging utilization of the Program to ...

  12. Contacts for the Assistant General Counsel for Procurement and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Laura L. Hoffman, Deputy Assistant General Counsel 202-586-8836 laura.hoffman@hq.doe.gov Kevin R. Hilferty, Attorney-Adviser 202-586-8260 Kevin.hilferty@hq.doe.gov Renee S. ...

  13. FAL 2010-03, Strategic Integrated Procurement Enterprise System (STRIPES)

    Energy Savers [EERE]

  14. TO: Procurement Directors/Contracting Officers FROM: Director

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    policy-flashes. Questions concerning this policy flash should be directed to Jason Taylor, of the Contract and Financial Assistance Policy Division at (202) 287-1560 or at...

  15. TO: Procurement Directors FROM: Director, Contract and Financial...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    policy-flashes. Questions concerning this policy flash should be directed to Jason Taylor of the Contract and Financial Assistance Policy Division, Office of Policy, Office of...

  16. TO: Procurement Directors/Contracting Officers FROM: Director

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    policy-flashes. Questions concerning this policy flash should be directed to Jason Taylor of the Contract and Financial Assistance Policy Division, at Jason.Taylor@hq.doe.gov...

  17. TO: Procurement Directors FROM: Director Contract and Financial...

    Broader source: Energy.gov (indexed) [DOE]

    Directors FROM: Director Contract and Financial Assistance Policy Division Office of ... Guide Chapter 5.1 and Guide to Financial Assistance Chapter 2, Section 2.6.1 ...

  18. TO: Procurement Directors/Contracting Officers FROM: Director

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Questions concerning this policy flash should be directed to Jason Taylor, of the Contract and Financial Assistance Policy Division at (202) 287-1560 or at Jason.Taylor@hq.doe.gov ...

  19. SBOT DIST OF COLUMBIA HEADQUARTERS PROCUREMENT POC Michael Raizen

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Construction 236220 Water and Sewer Line and Related ... Other Heavy and Civil Engineering Construction 237990 ... Deep Sea Freight Transportation 483111 Inland Water Freight ...

  20. TO: Procurement Directors/Contracting Officers FROM: Director

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    more, at least 3 full business days, for (formerly known as Section 311 notices): 5 - Contract awards. - Announcement of selected applications for negotiation of financial ...

  1. TO: Procurement Directors FROM: Director Contract and Financial...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office of Policy Office of Acquisition and Project Management SUBJECT: Aligning Contract Incentives for Capital Asset Projects SUMMARY: On December 13, 2012, the Deputy ...

  2. Procuring and Implementing Solar Projects on Public Buildings...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... And this is a 100-page guide that's really soup to nuts, ... in the Room", starts the discussion, and the last chapter is ... should also be able to teach a hands-on installation class. ...

  3. Webinar: Procuring Fuel Cells for Stationary Power: A Guide for...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The speaker today is Pete Devlin, the Fuel Cell Technologies Office's Market ... which means the ability to use waste biogas from wastewater treatment plants or landfills. ...

  4. Case Study: Enabling Sustainable Acquisition by Improving Procurement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Social Science Principles Applied * Social Network & Communications * Multiple Motivations * Leadership * Commitment * Information & Feedback * Infrastructure * Social Empowerment ...

  5. Energy Procurement Information Center (EPiC) - Deb Bouslog, Systems

    Energy Savers [EERE]

    (CHP) White Paper, April 2009 | Department of Energy Portfolio Standards and the Promotion of Combined Heat and Power (CHP) White Paper, April 2009 Energy Portfolio Standards and the Promotion of Combined Heat and Power (CHP) White Paper, April 2009 This 2009 U.S. Environmental Protection Agency (EPA) Combined Heat and Power (CHP) Partnership paper covers Energy Portfolio Standards (EPS) which are becoming a widely applied method of encouraging the development of renewable and efficient

  6. TO: Procurement Directors/Contracting Officers FROM: Director

    Energy Savers [EERE]

    policy-flashes. Questions concerning this policy flash should be directed to Kevin M. Smith, of the Contract and Financial Assistance Policy Division, at Kevin.M.Smith@hq.doe.gov...

  7. Procurement of a fully licensed radioisotope thermoelectric generator transportation system

    SciTech Connect (OSTI)

    Adkins, H.E.; Bearden, T.E.

    1990-10-01

    A fully licensed transportation system for Radioisotope Thermoelectric Generators and Light-Weight Radioisotope Heater Units is currently being designed and built. The system will comply with all applicable US Department of Transportation regulations without the use of a DOE Alternative.'' The US Department of Transportation has special double containment'' requirements for plutonium. The system packaging uses a doubly contained bell jar'' concept. A refrigerated trailer is used for cooling the high-heat payloads. The same packaging is used for both high- and low-heat payloads. The system is scheduled to be available for use by mid-1992. 4 refs., 4 figs., 2 tabs.

  8. TO: Procurement Directors/Contracting Officers FROM: Director

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Division Office of Policy Office of Acquisition and Project Management SUBJECT: Acquisition Letter 2014-05Financial Acquisition Letter 2014-02 Congressional Notifications and ...

  9. 102815 Update Major Procurements Awarded since 2006 (v1).xlsx

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Order Cost Reimbursable Task Order 72214-102117 465M Portsmouth Gaseous Diffusion Plant Decontamination and Decommissioning Flour-B&W Portsmouth, LLC DE-AC30-10CC40017 Full...

  10. 111815 Update Major Procurements Awarded since 2006 (v1).xlsx

    Energy Savers [EERE]

    Order Cost Reimbursable Task Order 72214-102117 465M Portsmouth Gaseous Diffusion Plant Decontamination and Decommissioning Flour-B&W Portsmouth, LLC DE-AC30-10CC40017 Full...

  11. 102015 Update Major Procurements Awarded since 2006 (v1).xlsx

    Office of Environmental Management (EM)

    Competition Cost Plus Award Fee 10112-93017 1.417B Phase I Decomissioning of West Valley Demolition Project CH2M Hill B&W West Valley, LLC Full and Open Competition Cost...

  12. Cyber Security Procurement Language for Control Systems Version...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    power generators, subway systems, dams, telecommunication systems, natural gas pipelines, and many others. Simply stated, a control system gathers information and then...

  13. TO: Procurement Directors/Contracting Officers FROM: Director

    Broader source: Energy.gov (indexed) [DOE]

    flash should be directed to John Lucas, Assistant General Counsel for Technology Transfer in the Office of the General Counsel by phone at (202) 586-2939 or by email at...

  14. TO: Procurement Directors FROM: Director Contract and Financial...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to existing affected contracts. Attached is Acquisition Letter 2013-07, which provides suggested modification language. (The Final Rule's revisions are administrative in nature. ...

  15. TO: Procurement Directors Head of Contracting Activities FROM...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SUBJECT: Initiatives to Achieve Strategic Plan 2014-2018 Performance Goal Focused on Cost Savings SUMMARY: The Department of Energy (DOE) Strategic Plan 2014-2018 includes language ...

  16. TO: Procurement Directors FROM: Director Contract and Financial...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2013, ATTACHMENT 2 Sample COI ADDED WB LANGUAGE JULY 2013.docx and ATTACHMENT 3 - Sample ...office-managementoperational- managementprocurement-and-acquisitionpolicy-flashes. ...

  17. TO: Procurement Directors FROM: Director Contract and Financial...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    We will issue an Acquisition Letter shortly with suggested contract modification language. (The Final Rule's revisions "... are designed to clarify and streamline existing ...

  18. Office of Federal Procurement (OFPP) Determination of Executive

    Office of Environmental Management (EM)

    Office of Executive Resources Office of the Chief Human Capital Officer U.S. Department of Energy Excepted Service Exceptionally Well Qualified (EWQ) (EQ Pay Plan) Policy and Operating Procedures Table of Contents I. AUTHORITY AND PURPOSE ........................................................................................................... 4 II. BACKGROUND ............................................................................................................................... 4 III.

  19. Procurement Options for New Renewable Electricity Supply | Open...

    Open Energy Info (EERE)

    Finance, Low emission development planning, -LEDS Resource Type: Case studiesexamples, Lessons learnedbest practices, Technical report Website: nrelpubs.nrel.govWebtopws...

  20. PIA - Savannah River Nuclear Solution (SRNS) Procurement Cycle...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    System (HRMS) PIA - Savannah River Nuclear Solution (SRNS) MedGate Occupational Health and Safety Medical System (OHS) (Includes the Drug and Alcohol Testing System (Assistant)

  1. TO: Procurement Directors Head of Contracting Activities FROM...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (DOE) Strategic Plan 2014-2018 includes language designed to expand the use of strategic ...office-managementoperational- managementprocurement-and-acquisitionpolicy-flashes. ...

  2. Procuring Fuel Cells for Stationary Power: A Guide for Federal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fuel Cells for Stationary Power: A Guide for Federal Facility Decision Makers OCTOBER 2011 Fuel Cell Technologies Program Oak Ridge National Laboratory 2 October 2011 NOTICE This ...

  3. Light-scattering properties of a Venetian blind slat used for daylighting applications

    SciTech Connect (OSTI)

    Nilsson, Annica M.; Jonsson, Jacob C.

    2010-12-15

    The low cost, simplicity, and aesthetic appearance of external and internal shading devices, make them commonly used for daylighting and glare-control applications. Shading devices, such as Venetian blinds, screens, and roller shades, generally exhibit light scattering and/or light redirecting properties. This requires the bi-directional scattering distribution function (BSDF) of the material to be known in order to accurately predict the daylight distribution and energy flow through the fenestration system. Acquiring the complete BSDF is not a straightforward task, and to complete the process it is often required that a model is used to complement the measured data. In this project, a Venetian blind slat with a white top surface and a brushed aluminum bottom surface was optically characterized. A goniophotometer and an integrating sphere spectrophotometer were used to determine the angle resolved and hemispherical reflectance of the sample, respectively. The acquired data were fitted to a scattering model providing one Lambertian and one angle dependent description of the surface properties. These were used in combination with raytracing to obtain the complete BSDFs of the Venetian blind system. (author)

  4. Thermal and Electrical Effects of Partial Shade in Monolithic Thin-Film Photovoltaic Modules: Preprint

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    | SciTech Connect Journal Article: Thermal Signatures of The Kondo Volume Collapse in Cerium Citation Details In-Document Search Title: Thermal Signatures of The Kondo Volume Collapse in Cerium X-ray diffraction measurements of cerium in the vicinity of the isostructural {gamma}-{alpha} transition have been performed with high precision and accuracy from room temperature to almost 800 K. The disputed location of the critical point has been found to occur at 1.5 {+-} 0.1 GPa and 480 {+-} 10

  5. How Do You Shade Your Home in the Summer? | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This will ensure your trees are healthy and they will generally require less water. And to be environmentally friendly-use natural fertilizers and pesticides. And if you aren't ...

  6. Solar Census„Perfecting the Art of Automated, Remote Solar Shading...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Surveyor uses state-of-the-art software and patented algorithms to provide a solar access ... that can be instantly accessed by the solar community given the address of the property. ...

  7. Iowa Shade Trees Bring Energy Bills Down, Beauty Up | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Volunteers from the Waverly Trees Forever group are planting windbreak trees on the north side of the mobile home court. Waverly experienced record flooding in 2008. | Photo Courtesy of Trees Forever Volunteers from the Waverly Trees Forever group are planting windbreak trees on the north side of the mobile home court. Waverly experienced record flooding in 2008. | Photo Courtesy of Trees Forever Lindsay Gsell What are the key facts? Iowa non-profit will plant 2,500 trees to encourage energy

  8. Partial Shading in Monolithic Thin Film PV Modules: Analysis and Design |

    Broader source: Energy.gov (indexed) [DOE]

    Did you know: Incandescent light bulbs only convert about 10 percent of the energy they consume into light and the rest is released as heat. The Energy Department's Energy Bike demonstrates the physical effort it takes to power incandescent, compact fluorescent and LED light bulbs. Students from Churchill Road Elementary School in Virginia recently pedaled for power at their Earth Day assembly, learning firsthand about energy efficiency. | Photo courtesy of the Energy Department. Did you know:

  9. Magnetic roller gas gate employing transonic sweep gas flow to isolate regions of differing gaseous composition or pressure

    DOE Patents [OSTI]

    Doehler, Joachim

    1994-12-20

    Disclosed herein is an improved gas gate for interconnecting regions of differing gaseous composition and/or pressure. The gas gate includes a narrow, elongated passageway through which substrate material is adapted to move between said regions and inlet means for introducing a flow of non-contaminating sweep gas into a central portion of said passageway. The gas gate is characterized in that the height of the passageway and the flow rate of the sweep gas therethrough provides for transonic flow of the sweep gas between the inlet means and at least one of the two interconnected regions, thereby effectively isolating one region, characterized by one composition and pressure, from another region, having a differing composition and/or pressure, by decreasing the mean-free-path length between collisions of diffusing species within the transonic flow region. The gas gate preferably includes a manifold at the juncture point where the gas inlet means and the passageway interconnect.

  10. Affirmative procurement of biobased products under service and construction contracts (FAR clause 52.223-2)

    Broader source: Energy.gov [DOE]

    The Department's Contracting Officers are reminded of the applicability of FAR clause 52.223-2 that requires contractors to submit an annual report of their biobased purchases by October 31 in the...

  11. MEMORANDUM FOR H FROM: ACTING SENIOR PROCUREMENT EXECUTIVE OFFICE OF ACQUISITION MANAGEMENT

    Energy Savers [EERE]

    ^ g December 1, 200S MEMORANDUM FOR ELIZABETH MONTOYA TRANSITION TEAM FROM THOMAS N. PYKE, J CHIEF INFORMATION OFFICER SUBJECT: Follow-up to our meeting this morning Carl Staton and I appreciated the opportunity to brief you this morning on our office's activities, including the cyber security issue. We noted four follow-up actions: 1. The breakdown ofOCIO Federal and contracting FTE at all of our sites is: Federal Contractor a. Forrestal 51 144 b. Germantown 85 213 c. Albuquerque 1 39 d.

  12. Policy Flash 2013-21 Change to Procurement Evaluation & Re-Engineering...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    policy flash should be directed to Mike Larson of the Office of Acquisition and Project Management, Strategic Programs Division at (202) 287-1426 or at Michael.Larson@hq.doe.gov. ...

  13. Veteran Institute for Procurement Conference, March 10-12 & June 9-11, 2015, Potomac, MD

    Broader source: Energy.gov [DOE]

    VIP ACCEPTING APPLICATIONS FORMARCH 10-12 & JUNE 9-11 SESSIONS  Funded entirely by the Montgomery County Chamber Community Foundation, partners and VIP sponsors, the program is offered AT NO...

  14. Before the House Oversight and Government Reform Subcommittee on Government Management, Organization, and Procurement

    Broader source: Energy.gov [DOE]

    Subject: Green Building Practices in the Federal Building Sector By: Kathleen Hogan, Deputy Assistant Secretary Office of Energy Efficiency and Renewable Energy

  15. USIPO_LSP%20Procurement%20Clause%20_April%202013.pdf

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    required to load items to be transported onto the LSP transport vehicle (e.g. truck, van, trailer, vessel, rail car) at the factory. Any exception to this requirement must be...

  16. TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division

    Office of Environmental Management (EM)

    COUNCIL OF STATE GOVERNMENTS THE ELECTRIC TRANSMISSION LINE SITING COMPACT LEGISLATIVE BRIEFING Background and Summary Background and Need The siting of interstate transmission lines has long been a problem that has vexed both states and the federal government. With the expected growth in electricity demand, coupled with the need to bring renewable energy to market and the necessity to enhance and secure the nation's energy infrastructure, the need for added transmission capacity has never been

  17. POLICY FLASH 2014-25 Revision to the Procurement Strategy Panel (PSP) Briefing Process

    Broader source: Energy.gov [DOE]

    For DOE questions concerning the policy flash or the revised Acquisition Guide, please contact Sangok Shin at (202) 287-1474 or sangok.shin@hq.doe.gov.

  18. Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB) Procurement Specifications [SEC 1 and 2

    SciTech Connect (OSTI)

    BAZINET, G.D.

    2000-05-01

    This specification section defines the welding, brazing, thermal treatment, examination and testing requirements for carbon steel, and stainless steel piping.

  19. USIPO_LSP%20Procurement%20Clause%20_April%202013.pdf

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Coordination with ITER Logistical Services Provider (LSP) [April 2013] I. TRANSPORTATION ARRANGEMENTS Transportation of hardware/equipment covered under this Agreement may be conducted by the ITER Project's Global Logistical Services Provider (LSP), Daher International and/or its United States partner, TransProject. The U.S. ITER Project Office (USIPO) will issue Task Orders directly to the LSP for transportation, logistics, and customs clearance associated with items delivered under this

  20. Savannah River Site Saves $10 Million with Innovative Commercial Procurement Practices

    Broader source: Energy.gov [DOE]

    AIKEN, S.C. – The management and operations contractor for the EM program at the Savannah River Site (SRS) created more than $10 million in cost savings in fiscal year 2013 by adopting successful purchasing practices used by America’s top companies.

  1. Acquisition Financial Assistance Letter No.2010-03 Strategic Integrated Procurement Enterprise System (STRIPES)

    Broader source: Energy.gov [DOE]

    Attached is the subject AL/FAL which prescribes requirements and guidance pertaining to the Department's implementation and use of STRIPES.

  2. An aerial radiological survey of the Tonopah Test Range including Clean Slate 1,2,3, Roller Coaster, decontamination area, Cactus Springs Ranch target areas. Central Nevada

    SciTech Connect (OSTI)

    Proctor, A.E.; Hendricks, T.J.

    1995-08-01

    An aerial radiological survey was conducted of major sections of the Tonopah Test Range (TTR) in central Nevada from August through October 1993. The survey consisted of aerial measurements of both natural and man-made gamma radiation emanating from the terrestrial surface. The initial purpose of the survey was to locate depleted uranium (detecting {sup 238}U) from projectiles which had impacted on the TTR. The examination of areas near Cactus Springs Ranch (located near the western boundary of the TTR) and an animal burial area near the Double Track site were secondary objectives. When more widespread than expected {sup 241}Am contamination was found around the Clean Slates sites, the survey was expanded to cover the area surrounding the Clean Slates and also the Double Track site. Results are reported as radiation isopleths superimposed on aerial photographs of the area.

  3. Passive cooling and heating program at Oak Ridge National Laboratory for FY-1981

    SciTech Connect (OSTI)

    Shapira, H.B.; Kaplan, S.I.; Chester, C.V.

    1981-01-01

    Construction was completed of an earth-sheltered, passively solar heated office-dormitory, the Joint Institute for Heavy Ion Research, designed at ORNL. Instrumentation of the building was designed, procured, and installed. Building performance will be monitored and compared with predictions of the DOE-2 code. A study of the incorporation of vegetation on architecture was conducted by the Harvard School of Design. A final report was issued which is a prototype handbook for the use of vegetation to reduce cooling loads in structures. An experiment to reduce the cooling requirement of mobile homes by shading with fast-growing vines was begun: a maintenance-oriented trellis was constructed and vines were planted. An RFP for the production of a prototype set of reflective insulating blinds was issued.

  4. Electric load monitoring to support a shared energy savings procurement at the US Maritime Administration Merchant Marine Academy

    SciTech Connect (OSTI)

    Armstrong, P.R.; Parker, G.B.

    1992-06-01

    Equipment from the Mobile Energy Laboratory (MEL) testing and application program supported by the US Department of Energy Federal Energy Management Program (DOE-FEMP) was applied to measure three-phase power demand of three large buildings at the US Merchant Marine Academy (MMA) on Long Island, New York. The selected buildings were Bowditch Hall, Fulton-Gibbs Hall, and the Library. The MEL equipment was installed on March 17, 1991. Instruments to monitor the Bowditch Hall chiller as a separate load were added on June 2, 1991. MEL Test Procedure {number_sign}1, Building Energy Monitoring, was followed in the installation and operation of the monitoring equipment. The monitoring objectives were to (1) provide a baseline for assessing energy savings resulting from future energy conservation measures that are to be implemented in the monitored buildings, and (2) provide information for recommending cost-effective energy conservation opportunities. Results of the long-term, whole building monitoring project at the MMA are presented in this report.

  5. Electric load monitoring to support a shared energy savings procurement at the US Maritime Administration Merchant Marine Academy

    SciTech Connect (OSTI)

    Armstrong, P.R.; Parker, G.B.

    1992-06-01

    Equipment from the Mobile Energy Laboratory (MEL) testing and application program supported by the US Department of Energy Federal Energy Management Program (DOE-FEMP) was applied to measure three-phase power demand of three large buildings at the US Merchant Marine Academy (MMA) on Long Island, New York. The selected buildings were Bowditch Hall, Fulton-Gibbs Hall, and the Library. The MEL equipment was installed on March 17, 1991. Instruments to monitor the Bowditch Hall chiller as a separate load were added on June 2, 1991. MEL Test Procedure {number sign}1, Building Energy Monitoring, was followed in the installation and operation of the monitoring equipment. The monitoring objectives were to (1) provide a baseline for assessing energy savings resulting from future energy conservation measures that are to be implemented in the monitored buildings, and (2) provide information for recommending cost-effective energy conservation opportunities. Results of the long-term, whole building monitoring project at the MMA are presented in this report.

  6. Acquisition Guide Chapter 4.6- Assigning Identifying Numbers Outside of the Strategic Integrated Procurement Enterprise System (STRIPES)

    Broader source: Energy.gov [DOE]

    The subject guide chapter provides guidance on the DOE's procedures for assigning identifying numbers to all new requisitions, solicitations and business instruments processed outside of STRIPES. This Guide Chapter does not apply to instrument numbers issued and business instruments awarded prior to the deployment of STRIPES at the DOE.

  7. Best Practices in Procurement: Discover Tribal Benefits Through GSA and Requests for Proposals That Guarantee Cost Savings Webinar

    Broader source: Energy.gov [DOE]

    This webinar will show attendees how to develop a request for proposal (RFP). It is held from 11 a.m. to 12:30 p.m. on Aug. 5, 2015.

  8. Temporary Waiver of Mandatory Use of the Strategic Integrated Procurement Enterprise System (STRIPES) for Certain Purchase Card Transactions

    Broader source: Energy.gov [DOE]

    Several issues have been identified relating to the use of STRIPES for the processing of transactions at or below the micro-purchase threshold of $3,000 using the Government-wide purchase card. These issues relate strictly to the efficient processing of such transactions and not to the ability of STRIPES to properly and accurately process these actions.

  9. Energy-Performance-Based Design-Build Process: Strategies for Procuring High-Performance Buildings on Typical Construction Budgets: Preprint

    SciTech Connect (OSTI)

    Scheib, J.; Pless, S.; Torcellini, P.

    2014-08-01

    NREL experienced a significant increase in employees and facilities on our 327-acre main campus in Golden, Colorado over the past five years. To support this growth, researchers developed and demonstrated a new building acquisition method that successfully integrates energy efficiency requirements into the design-build requests for proposals and contracts. We piloted this energy performance based design-build process with our first new construction project in 2008. We have since replicated and evolved the process for large office buildings, a smart grid research laboratory, a supercomputer, a parking structure, and a cafeteria. Each project incorporated aggressive efficiency strategies using contractual energy use requirements in the design-build contracts, all on typical construction budgets. We have found that when energy efficiency is a core project requirement as defined at the beginning of a project, innovative design-build teams can integrate the most cost effective and high performance efficiency strategies on typical construction budgets. When the design-build contract includes measurable energy requirements and is set up to incentivize design-build teams to focus on achieving high performance in actual operations, owners can now expect their facilities to perform. As NREL completed the new construction in 2013, we have documented our best practices in training materials and a how-to guide so that other owners and owner's representatives can replicate our successes and learn from our experiences in attaining market viable, world-class energy performance in the built environment.

  10. Temporary Waiver of Mandatory Use of Strategic Integrated Procurement Enterprise System (STRIPES) for Certain Purchase Card Transactions

    Broader source: Energy.gov [DOE]

    Several issues have been identified relating to the use of STRIPES for the processing of transactions at or below the micro-purchase threshold of $3,000 using the Government-wide purchase card. This issues relate strictly to the efficient processing of such transactions and not to the ability of STRIPES to properly and accurately process these actions.

  11. Using an Energy Performance Based Design-Build Process to Procure a Large Scale Low-Energy Building: PReprint

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Capability: Sequential Bayesian Inference, Hypothesis Testing, and Power Analysis (Technical Report) | SciTech Connect Technical Report: Using a Simple Binomial Model to Assess Improvement in Predictive Capability: Sequential Bayesian Inference, Hypothesis Testing, and Power Analysis Citation Details In-Document Search Title: Using a Simple Binomial Model to Assess Improvement in Predictive Capability: Sequential Bayesian Inference, Hypothesis Testing, and Power Analysis We present a

  12. DATE:

    Broader source: Energy.gov (indexed) [DOE]

    DATE: February 1, 2012 TO: Procurement Directors FROM: Director, Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Acquisition...

  13. [Federal Register: April 19, 2006 (Volume 71, Number 75)

    Broader source: Energy.gov (indexed) [DOE]

    DATE: March 5, 2012 TO: Procurement Directors FROM: Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Federal Acquisition...

  14. [Federal Register: April 19, 2006 (Volume 71, Number 75)

    Broader source: Energy.gov (indexed) [DOE]

    2-35 DATE: April 23, 2012 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management...

  15. [Federal Register: April 19, 2006 (Volume 71, Number 75)

    Broader source: Energy.gov (indexed) [DOE]

    March 15, 2012 TO: Procurement Directors FROM: Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Federal Acquisition...

  16. --No Title--

    Broader source: Energy.gov (indexed) [DOE]

    June 23, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: U.S....

  17. DATE:

    Broader source: Energy.gov (indexed) [DOE]

    36 DATE: April 23, 2012 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management...

  18. BERKELEY LAB WINDOW

    Energy Science and Technology Software Center (OSTI)

    2015-03-06

    WINDOW features include: - Microsoft Windows TM interface - algorithms for the calculation of total fenestration product U-values and Solar Heat Gain Coefficient consistent with ASHRAE SPC 142, ISO 15099, and the National Fenestration Rating Council - a Condensation Resistance Index in accordance with the NFRC 500 Standard - and integrated database of properties - imports data from other LBNL window analysis software: - Import THERM file into the Frame Library - Import records frommore » IGDB and OPtics5 into the Glass Library for the optical properties of coated and uncoated glazings, laminates, and applied films. Program Capabilities WINDOW 7.2 offers the following features: The ability to analyze products made from any combination of glazing layers, gas layers, frames, spacers, and dividers under any environmental conditions and at any tilt; The ability to model complex glazing systems such as venetian blinds and roller shades. Directly accessible libraries of window system components, (glazing systems, glazing layers, gas fills, frame and divider elements), and environmental conditions; The choice of working in English (IP), or Systeme International (SI) units; The ability to specify the dimensions and thermal properties of each frame element (header, sills, jamb, mullion) in a window; A multi-band (wavelength-by-wavelength) spectral model; A Glass Library which can access spectral data files for many common glazing materials from the Optics5database; A night-sky radiative model; A link with the DOE-2.1E and Energy Plus building energy analysis program. Performance Indices and Other Results For a user-defined fenestration system and user-defined environmental conditions, WINDOW calculates: The U-value, solar heat gain coefficient, shading coefficient, and visible transmittance for the complete window system; The U-value, solar heat gain coefficient, shading coefficient, and visible transmittance for the glazing system (center-of-glass values); The U-values of the frame and divider elements and corresponding edge-of-glass areas (based on generic correlations); The total solar and visible transmittance and reflectances of the glazing system. Color properties, i.e. L*, a*, and b* color coordinates, dominant wavelength, and purity for transmitted and reflected (outdoor) solar radiation; The damage-weighted transmittance of the glazing system between 0.3 an 0.38 microns; The angular dependence of the solar and visible transmittances, solar and visible reflectances, solar absorptance, and solar heat gain coefficient of the glazing system; The percent relative humidity of the inside and outside air for which condensation will occur on the interior and exterior glazing surfaces respectively; The center-of-glass temperature distribution.« less

  19. BERKELEY LAB WINDOW

    SciTech Connect (OSTI)

    Curcija, Dragan Charlie; Zhu, Ling; Czarnecki, Stephen; Mitchell, Robin D.; Kohler, Christian; Vidanovic, Simon V.; Huizenga, Charlie

    2015-03-06

    WINDOW features include: - Microsoft Windows TM interface - algorithms for the calculation of total fenestration product U-values and Solar Heat Gain Coefficient consistent with ASHRAE SPC 142, ISO 15099, and the National Fenestration Rating Council - a Condensation Resistance Index in accordance with the NFRC 500 Standard - and integrated database of properties - imports data from other LBNL window analysis software: - Import THERM file into the Frame Library - Import records from IGDB and OPtics5 into the Glass Library for the optical properties of coated and uncoated glazings, laminates, and applied films. Program Capabilities WINDOW 7.2 offers the following features: The ability to analyze products made from any combination of glazing layers, gas layers, frames, spacers, and dividers under any environmental conditions and at any tilt; The ability to model complex glazing systems such as venetian blinds and roller shades. Directly accessible libraries of window system components, (glazing systems, glazing layers, gas fills, frame and divider elements), and environmental conditions; The choice of working in English (IP), or Systeme International (SI) units; The ability to specify the dimensions and thermal properties of each frame element (header, sills, jamb, mullion) in a window; A multi-band (wavelength-by-wavelength) spectral model; A Glass Library which can access spectral data files for many common glazing materials from the Optics5database; A night-sky radiative model; A link with the DOE-2.1E and Energy Plus building energy analysis program. Performance Indices and Other Results For a user-defined fenestration system and user-defined environmental conditions, WINDOW calculates: The U-value, solar heat gain coefficient, shading coefficient, and visible transmittance for the complete window system; The U-value, solar heat gain coefficient, shading coefficient, and visible transmittance for the glazing system (center-of-glass values); The U-values of the frame and divider elements and corresponding edge-of-glass areas (based on generic correlations); The total solar and visible transmittance and reflectances of the glazing system. Color properties, i.e. L*, a*, and b* color coordinates, dominant wavelength, and purity for transmitted and reflected (outdoor) solar radiation; The damage-weighted transmittance of the glazing system between 0.3 an 0.38 microns; The angular dependence of the solar and visible transmittances, solar and visible reflectances, solar absorptance, and solar heat gain coefficient of the glazing system; The percent relative humidity of the inside and outside air for which condensation will occur on the interior and exterior glazing surfaces respectively; The center-of-glass temperature distribution.

  20. A Post-Occupancy Monitored Evaluation of the Dimmable Lighting, Automated Shading, and Underfloor Air Distribution System in The New York Times Building

    SciTech Connect (OSTI)

    Lee, E. S.; Fernandes, L. L.; Coffey, B.; McNeil, A.; Clear, R.; Webster, T.; Bauman, F.; Dickerhoff, D.; Heinzerling, D.; Hoyt, T.

    2013-01-01

    With aggressive goals to reduce national energy use and carbon emissions, the U.S. Department of Energy (DOE) will be looking to exemplary buildings that have already invested in new approaches to achieving the energy performance goals now needed at a national level. The New York Times Building, in New York, New York, incorporates a number of innovative technologies, systems and processes and could become model for widespread replication in new and existing buildings. A year-long monitored study was conducted to verify energy performance, assess occupant comfort and satisfaction with the indoor environment, and evaluate impact on maintenance and operations. Lessons learned were derived from the analysis; these lessons could help identify and shape policy, financial, or supporting strategies to accelerate diffusion in the commercial building market.

  1. High Performance Building Facade Solutions PIER Final Project Report

    SciTech Connect (OSTI)

    Lee, Eleanor; Selkowitz, Stephen

    2009-12-31

    Building facades directly influence heating and cooling loads and indirectly influence lighting loads when daylighting is considered, and are therefore a major determinant of annual energy use and peak electric demand. Facades also significantly influence occupant comfort and satisfaction, making the design optimization challenge more complex than many other building systems.This work focused on addressing significant near-term opportunities to reduce energy use in California commercial building stock by a) targeting voluntary, design-based opportunities derived from the use of better design guidelines and tools, and b) developing and deploying more efficient glazings, shading systems, daylighting systems, facade systems and integrated controls. This two-year project, supported by the California Energy Commission PIER program and the US Department of Energy, initiated a collaborative effort between The Lawrence Berkeley National Laboratory (LBNL) and major stakeholders in the facades industry to develop, evaluate, and accelerate market deployment of emerging, high-performance, integrated facade solutions. The LBNL Windows Testbed Facility acted as the primary catalyst and mediator on both sides of the building industry supply-user business transaction by a) aiding component suppliers to create and optimize cost effective, integrated systems that work, and b) demonstrating and verifying to the owner, designer, and specifier community that these integrated systems reliably deliver required energy performance. An industry consortium was initiated amongst approximately seventy disparate stakeholders, who unlike the HVAC or lighting industry, has no single representative, multi-disciplinary body or organized means of communicating and collaborating. The consortium provided guidance on the project and more importantly, began to mutually work out and agree on the goals, criteria, and pathways needed to attain the ambitious net zero energy goals defined by California and the US.A collaborative test, monitoring, and reporting protocol was also formulated via the Windows Testbed Facility in collaboration with industry partners, transitioning industry to focus on the importance of expecting measured performance to consistently achieve design performance expectations. The facility enables accurate quantification of energy use, peak demand, and occupant comfort impacts of synergistic facade-lighting-HVAC systems on an apples-to-apples comparative basis and its data can be used to verify results from simulations. Emerging interior and exterior shading technologies were investigated as potential near-term, low-cost solutions with potential broad applicability in both new and retrofit construction. Commercially-available and prototype technologies were developed, tested, and evaluated. Full-scale, monitored field tests were conducted over solstice-to-solstice periods to thoroughly evaluate the technologies, uncover potential risks associated with an unknown, and quantify performance benefits. Exterior shading systems were found to yield net zero energy levels of performance in a sunny climate and significant reductions in summer peak demand. Automated interior shading systems were found to yield significant daylighting and comfort-related benefits.In support of an integrated design process, a PC-based commercial fenestration (COMFEN) software package, based on EnergyPlus, was developed that enables architects and engineers to quickly assess and compare the performance of innovative facade technologies in the early sketch or schematic design phase. This tool is publicly available for free and will continue to improve in terms of features and accuracy. Other work was conducted to develop simulation tools to model the performance of any arbitrary complex fenestration system such as common Venetian blinds, fabric roller shades as well as more exotic innovative facade systems such as optical louver systems.

  2. E-Commerce Policies for Hq

    Broader source: Energy.gov [DOE]

    HQ Procurement Services Policies & Operating Proceduresfor Program Office Buyers Use of the Strategic Integrated Procurement Enterprise System (STRIPES)...

  3. Ventilation Systems for Cooling | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    tightly all the windows and exterior doors. Also install window shades or other window treatments and close the shades. Shades will help block out not only direct sunlight, but...

  4. Lighting Choices to Save You Money | Department of Energy

    Energy Savers [EERE]

    » Landscaping for Shade Landscaping for Shade A trellis with a climbing vine can shade a home and still allow air circulation. 
| Photo courtesy of John Krigger, Saturn Resource. A trellis with a climbing vine can shade a home and still allow air circulation. 
| Photo courtesy of John Krigger, Saturn Resource. Solar heat absorbed through windows and roofs can increase cooling costs, and incorporating shade from landscaping elements can help reduce this solar heat gain. Shading and

  5. Federal Buildings Supplemental Survey 1993

    U.S. Energy Information Administration (EIA) Indexed Site

    ... 173 87 49 49 36 91 139 Tinted or Reflective Glass or Shading Film ... 158 83 47 40 56 94 117 Exterior or Interior Shading or...

  6. Federal Buildings Supplemental Survey 1993

    U.S. Energy Information Administration (EIA) Indexed Site

    ... 173 172 23 12 37 82 56 17 Tinted or Reflective Glass or Shading Film ... 158 157 15 8 38 76 60 16 Exterior or Interior Shading or...

  7. City of Ashland- Solar Rights Ordinance

    Broader source: Energy.gov [DOE]

    Property owners can apply for a Solar Access Permit for protection of shading by vegetation only. Shading by buildings is protected by the solar setback provision.

  8. Is Open to Public

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LAI sensor. Accuracy is improved in shaded conditions; here shade is provided by an umbrella (ARM photo). On the Internet: For more information on the ARMLBNL Carbon Project,...

  9. Untitled Document

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Procurement Services Mark Edwards Manager - Procurement Services Mission Statement To obtain the foremost value in goods and services from qualified suppliers using sound business practices Judy Lanier, C.P.M. Senior Procurement Specialist Yoli Sandate Procurement Card Program Administrator Janet Miehls, C.P.M. Procurement Specialist Codey Burke BPA Student Debbie Charlet Senior Procurement Specialist Prime Contract Administration, Inter-Entity Contracts and Agreements, Procurement Services

  10. Regional Geologic Map

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Lane, Michael

    Shaded relief base with Hot Pot project area, generalized geology, selected mines, and major topographic features

  11. Regional Geologic Map

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Lane, Michael

    2013-06-28

    Shaded relief base with Hot Pot project area, generalized geology, selected mines, and major topographic features

  12. Policy Flash 2013-65 Procurement Evaluation & Re-Engineering Team (PERT) and Establishment of a 5-year Cycle with Corresponding Schedule

    Office of Energy Efficiency and Renewable Energy (EERE)

    Questions concerning this policy flash should be directed to Mike Larson of the Office of Acquisition and Project Management, Strategic Programs Division at (202) 287-1426 or at Michael.Larson@hq...

  13. Before the House Subcommittee on Technology, Information Policy, Intergovernmental Relations and Procurement Reform of the Committee on Overshigh and Government Reform

    Broader source: Energy.gov [DOE]

    Subject: The Government Accountability Office's Report on Potentially Duplicative IT Investments By: Michael Locatis

  14. Policy Flash 2014-06 Affirmative procurement of biobased products under service and construction contracts (FAR clause 52.223-2)

    Broader source: Energy.gov [DOE]

    Questions concerning this policy flash should be directed to Sharon Archer of the Contract and Financial Assistance Policy Division, Office of Policy, Office of Acquisition and Project Management...

  15. DOE Releases Draft Request for Proposal and Announces Pre-Solicitation Conference for Waste Isolation Pilot Plant (WIPP) Transportation Services Procurement

    Broader source: Energy.gov [DOE]

    Cincinnati -- The U.S. Department of Energy (DOE) Environmental Management Consolidated Business Center (EMCBC) today issued a Draft Request for Proposal (RFP) for Waste Isolation Pilot Plant (WIPP) Transportation Services.

  16. FY 2006 Executive Order 13101 Report: Department of Energy Affirmative Procurement and Recycling Fiscal Year 2006 Report, 3/12/07

    Broader source: Energy.gov [DOE]

    The Department of Energy (DOE) is pleased to transmit the enclosed report in fulfillment of the annual reporting requirements under Executive Order 13101, Greening the Government through Waste...

  17. Method and apparatus to control the lateral motion of a long metal bar being formed by a mechanical process such as rolling or drawing

    DOE Patents [OSTI]

    Chang, Tzyy-Shuh; Huang, Hsun-Hau; Lin, Chang-Hung

    2011-01-04

    An apparatus to control lateral motion of a bar moving along a guidance path includes a pair of rotatable hubs each having at least first and second rollers at locations around the perimeter of the hub. The first roller has a first retaining groove of a first radius and the second roller has a second groove of a second radius smaller than the first radius. Each hub further includes at least one guiding element located between the rollers with a guide channel extending in the outer surface. A mounting system allows the hubs to be rotated between first and second positions. In the first position the first rollers oppose each other forming a guideway having a first, enlarged diameter for capturing a free end of an approaching bar. In the second position the second rollers form a second, smaller diameter to match the actual size of the bar.

  18. DOE-STD-1090-2007; Hoisting and Rigging Standard (Formerly Hoisting...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... generally roller-mounted, traveling vertically within the mast of a cantilever truck. ... Overhead Traveling Crane: A crane with a movable bridge carrying a movable or fixed ...

  19. DOE-STD-1090-2004; Hoisting and Rigging (Formerly Hoisting and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... generally roller-mounted, traveling vertically within the mast of a cantilever truck. ... Overhead Traveling Crane: A crane with a movable bridge carrying a movable or fixed ...

  20. MHK Projects/Peniche Portugal | Open Energy Information

    Open Energy Info (EERE)

    and design of the next generation active controlled WaveRoller unit. Monitoring for sediment movement and fouling phenomenon will be ongoing. Project Installed Capacity (MW) 0...