Powered by Deep Web Technologies
Note: This page contains sample records for the topic "rocky flats colorado" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Vascular Flora of the Rocky Flats Area, Jefferson County, Colorado...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Vascular Flora of the Rocky Flats Area, Jefferson County, Colorado, USA Vascular Flora of the Rocky Flats Area, Jefferson County, Colorado, USA August 2010 Jody K. Nelson Vascular...

2

REVEGETATION OF THE ROCKY FLATS SITE, COLORADO  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REVEGETATION OF THE ROCKY FLATS SITE, COLORADO REVEGETATION OF THE ROCKY FLATS SITE, COLORADO Jody K. Nelson Professional Environmental Group/S.M. Stoller Corporation Rocky Flats Site 11025 Dover Street, Suite 1000 Westminster, CO 80021 ABSTRACT At the U.S. Department of Energy's (DOE's) Rocky Flats Site (Site), a former nuclear weapons component manufacturing plant near Golden, Colorado, approximately 650 acres were revegetated as part of the cleanup and closure activities. Numerous issues and challenges were addressed during the revegetation activities at the Site. These included deciding on revegetation and restoration goals; addressing poor substrate issues and soil compaction problems; use of soil amendments and topsoil; seed selection issues; timing and location of revegetation projects

3

Rocky Flats, Colorado, Site Quarterly Report of Site Surveillance...  

Office of Legacy Management (LM)

Site. LM provides periodic communications through several means, such as this report, web-based tools, and public meetings. LM prepared the Rocky Flats, Colorado, Site Site...

4

Rocky Flats, Colorado, Site Quarterly Report of Site Surveillance  

Office of Legacy Management (LM)

Site. LM provides periodic communications through several means, such as this report, web-based tools, and public meetings. LM prepared the Rocky Flats, Colorado, Site Site...

5

Water Monitoring Flume Replaced at the Rocky Flats, Colorado, Site |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Water Monitoring Flume Replaced at the Rocky Flats, Colorado, Site Water Monitoring Flume Replaced at the Rocky Flats, Colorado, Site Water Monitoring Flume Replaced at the Rocky Flats, Colorado, Site October 22, 2013 - 11:01am Addthis What does this project do? Goal 1. Protect human health and the environment In August of this year the U.S. Department of Energy (DOE) Office of Legacy Management (LM) Rocky Flats, site took advantage of an existing water diversion structure that was no longer needed, to replace an aging water monitoring flume and avoid future repairs that could interrupt data collection. The flume for Rocky Flats Legacy Management Agreement (RFLMA) Point of Evaluation (POE) monitoring location GS10 in South Walnut Creek was located at the bottom of fairly steep channel banks. The bank on the south side shows localized slumping and sliding toward the creek and GS10. Although

6

Increase in uranium concentration in streams draining Rocky Flats, Colorado  

Science Journals Connector (OSTI)

Uranium has been determined by fission track measurements of two suites of water samples taken at different times from a variety of surface waters in an area in central Colorado. Although this area surrounds the Rocky Flats nuclear plant at which parts for weapons are fabricated, the variations in U are inferred to be influenced most strongly by the distance of water flow across soil derived from the U-rich Laramie Formation. This flow produces progressive increases in U concentrations as flow proceeds eastward and hence is much more closely related to the local geochemistry and geology than to the presence of the Rocky Flats plant.

A.C. Delany; R.L. Fleischer

1978-01-01T23:59:59.000Z

7

Colorado and the Accelerated Cleanup at Rocky Flats  

SciTech Connect

When the Rocky Flats closure project was declared complete in October 2005, it was the largest environmental cleanup to date. Even more impressive, it was ahead of schedule and well under budget. Several factors combined to produce this success including a performance-based contract with financial incentives, development and application of innovative technologies, and a regulator-backed accelerated approach to the cleanup process. The factor in this success in which the State of Colorado had the largest role was in developing and enforcing the Rocky Flats Cleanup Agreement. In compliance with this agreement, cleanup was accomplished by means of multiple interim actions that led to a comprehensive final decision at the end. A key element that allowed the accelerated cleanup was constant consultation among DOE, its contractor, and the regulators plus collaboration with stakeholders. (authors)

Spreng, C. [Public Health and Environment, Colorado Dept., Denver, CO (United States)

2007-07-01T23:59:59.000Z

8

Map of mixed prairie grassland vegetation, Rocky Flats, Colorado  

SciTech Connect

A color vegetation map at the scale of 1:12,000 of the area surrounding the Rocky Flats, Rockwell International Plant near Boulder, Colorado, provides a permanent record of baseline data which can be used to monitor changes in both vegetation and environment and thus to contribute to future land management and land-use policies. Sixteen mapping units based on species composition were identified, and characterized by two 10-m/sup 2/ vegetation stands each. These were grouped into prairie, pasture, and valley side on the basis of their species composition. Both the mapping units and these major groups were later confirmed by agglomerative clustering analysis of the 32 vegetation stands on the basis of species composition. A modified Bray and Curtis ordination was used to determine the environmental factor complexes controlling the distribution of vegetation at Rocky flats. Recommendations are made for future policies of environmental management and predictions of the response to environmental change of the present vegetation at the Rocky Flats site.

Clark, S J.V.; Webber, P J; Komarkova, V; Weber, W A

1980-01-01T23:59:59.000Z

9

EIS-0276: Rocky Flats Plutonium Storage, Golden, Colorado  

Energy.gov (U.S. Department of Energy (DOE))

This EIS analyzes DOE's proposed action to provide safe interim storage of approximately 10 metric tons of plutonium at the Rocky Flats Environmental Technology Site (RFETS).

10

Hydraulic model analysis of water distribution system, Rockwell International, Rocky Flats, Colorado  

SciTech Connect

Rockwell International requested an analysis of the existing plant site water supply distribution system at Rocky Flats, Colorado, to determine its adequacy. On September 26--29, 1988, Hughes Associates, Inc., Fire Protection Engineers, accompanied by Rocky Flats Fire Department engineers and suppression personnel, conducted water flow tests at the Rocky Flats plant site. Thirty-seven flows from various points throughout the plant site were taken on the existing domestic supply/fire main installation to assure comprehensive and thorough representation of the Rocky Flats water distribution system capability. The analysis was completed in four phases which are described, together with a summary of general conclusions and recommendations.

Perstein, J.; Castellano, J.A. [Hughes Associates, Inc., Wheaton, MD (United States)

1989-01-20T23:59:59.000Z

11

Revegetation of the Rocky Flats Site | Department of Energy  

Energy Savers (EERE)

Flats Site Revegetation of the Rocky Flats Site Revegetation of the Rocky Flats, Colorado Site Revegetation of the Rocky Flats Site More Documents & Publications Landfill...

12

Geologic and geotechnical assessment RFETS Building 371, Rocky Flats, Colorado  

SciTech Connect

This report describes the review and evaluation of the geological, geotechnical and geophysical data supporting the design basis analysis for the Rocky Flats Environmental Test Site (RFETS) Building 371. The primary purpose of the geologic and geotechnical reviews and assessments described herein are to assess the adequacy of the crustal and near surface rock and soil model used in the seismic analysis of Building 371. This review was requested by the RFETS Seismic Evaluation Program. The purpose was to determine the adequacy of data to support the design basis for Building 371, with respect to seismic loading. The objectives required to meet this goal were to: (1) review techniques used to gather data (2) review analysis and interpretations of the data; and (3) make recommendations to gather additional data if required. Where there were questions or inadequacies in data or interpretation, recommendations were made for new data that will support the design basis analysis and operation of Building 371. In addition, recommendations are provided for a geologic and geophysical assessment for a new facility at the Rocky Flats Site.

Maryak, M.E.; Wyatt, D.E.; Bartlett, S.F.; Lewis, M.R.; Lee, R.C.

1995-12-13T23:59:59.000Z

13

Comprehensive appraisal of {sup 239+240}Pu in soils around Rocky Flats, Colorado  

SciTech Connect

Plutonium contamination of soils around Rocky Flats Environmental & Technology Site, near Golden, Colorado, resulted from past outdoor storage practices and subsequent remobilization due to inadequate cleanup practices. Until now human-health risk assessment has not been performed because of a lack of sufficient information regarding the spatial extent of {sup 239+240}Pu in soils. The purpose of this work was to elucidate the extent of plutonium contamination in surface soils, and to assess the uncertainty associated with the spatial distribution of {sup 239+240}Pu around Rocky Flats Environmental & Technology Site.

Litaor, M.I.; Allen, L. [EG& G Rocky Flats, Golden, CO (United States); Ellerbroek, D. [S.M. Stoller Corp., Boulder, CO (United States)] [and others

1995-12-01T23:59:59.000Z

14

Environmental Survey preliminary report, Rocky Flats Plant, Golden, Colorado  

SciTech Connect

This report presents the preliminary findings of the Environmental Survey of the United States Department of Energy (DOE), Rocky Flats Plant (RFP), conducted August 11 through 22, 1986. The Survey is being conducted by an multidisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team members are outside experts supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the RFP. The Survey covers all environmental media and all areas of environmental regulations. It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involves the review of existing site environmental data observations of the operations carried on at RFP, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain environmental problems identified during its on-site activates. The Sampling and Analysis Plan is being executed by DOE's Oak Ridge National Laboratory. When completed, the results will be incorporated into the RFP Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the RFP Survey. 75 refs., 24 figs., 33 tabs.

Not Available

1987-06-01T23:59:59.000Z

15

Plutonium contamination in soils in open space and residential areas near Rocky Flats, Colorado  

SciTech Connect

Spatial analysis of the {sup 240}Pu:{sup 239}Pu isotopic ratio of 42 soil samples collected around Rocky Flats Plant near Golden, Colorado, was conducted to assess the effect of Rocky Flats Plant activity on the soil environment. Two probability maps that quantified the uncertainty of the spatial distribution of plutonium isotopic ratios were constructed using the sequential Gaussian simulation technique (sGs). Assuming a plutonium isotopic ratio range of 0.152 {+-} 0.003 to 0.169 {+-} 0.009 is characteristic to global fallout in Colorado, and a mean value of 0.155 is representative for the Rocky Flats Plant area, the main findings of the current work were (1) the areas northwest and southwest of Rocky Flats Plant exhibited a plutonium ratio {ge}0.155, this were minimally impacted by the plant activity; (2) he study area east of Rocky Flats Plant exhibited a plutonium isotopic ratio {le}0.155, which is a definitive indicator of Rocky Flats Plant-derived plutonium; and (3) inventory calculations across the study area exhibited large standard error of estimates. These errors were originated from the high variability in plutonium activity over a small sampling scale and the uncertainty in the global fallout isotopic ratio. Using the mean simulated estimates of plutonium isotopic ratio, coupled with plutonium activity measured at 11 soil pits and additional plutonium information published elsewhere, the plutonium loading on the open space and residential areas amounted to 111.2 GBq, with a standard error of estimate of 50.8 GBq.

Litaor, M.I. [Tel-Hai Rodman Coll., Upper Galilee (Israel). Dept. of Biotechnology and Environmental Sciences

1999-02-01T23:59:59.000Z

16

Longevity and progressive abandonment of the Rocky Flats surface, Front Range, Colorado  

Science Journals Connector (OSTI)

The post-orogenic evolution of the Laramide landscape of the western U.S. has been characterized by late Cenozoic channel incision of basins and their adjacent ranges. One means of constraining the incision history of basins is dating the remnants of gravel-capped surfaces above modern streams. Here, we focus on an extensive remnant of the Rocky Flats surface between Golden and Boulder, Colorado, and use in situ-produced 10Be and 26Al concentrations in terrace alluvium to constrain the Quaternary history of this surface. Coal and Ralston Creeks, both tributaries of the South Platte River, abandoned the Rocky Flats surface and formed the Verdos and Slocum pediments, which are cut into Cretaceous bedrock between Rocky Flats and the modern stream elevations. Rocky Flats alluvium ranges widely in age, from >2Ma to ?400ka, with oldest ages to the east and younger ages closer to the mountain front. Numerical modeling of isotope concentration depth profiles suggests that individual sites have experienced multiple resurfacing events. Preliminary results indicate that Verdos and Slocum alluvium along Ralston Creek, which is slightly larger than Coal Creek, is several hundred thousand years old. Fluvial incision into these surfaces appears therefore to progress headward in response to downcutting of the South Platte River. The complex ages of these surfaces call into question any correlation of such surfaces based solely on their elevation above the modern channel.

Catherine A. Riihimaki; Robert S. Anderson; Elizabeth B. Safran; David P. Dethier; Robert C. Finkel; Paul R. Bierman

2006-01-01T23:59:59.000Z

17

Integrated Weed Control for Land Stewardship at Legacy Management's Rocky Flats Site in Colorado - 13086  

SciTech Connect

Land stewardship is one of nine sustainability programs in the U.S. Department of Energy's Environmental Management System. Land stewardship includes maintaining and improving ecosystem health. At the Rocky Flats Site near Westminster, Colorado, land stewardship is an integral component of the Office of Legacy Management's post-closure monitoring and management at the site. Nearly 263 hectares (650 acres) were disturbed and re-vegetated during site cleanup and closure operations. Proactive management of revegetation areas is critical to the successful reestablishment of native grasslands, wetlands, and riparian communities. The undisturbed native plant communities that occur at the site also require active management to maintain the high-quality wetlands and other habitats that are home to numerous species of birds and other wildlife such as elk and deer, rare plant communities, and the federally listed threatened Preble's meadow jumping mouse. Over the past several decades, an increase of Noxious weeds has impacted much of Colorado's Front Range. As a result, weed control is a key component of the land stewardship program at Rocky Flats. Thirty-three species of state-listed Noxious weeds are known to occur in the Central and Peripheral Operable Units at Rocky Flats, along with another five species that are considered invasive at the site. Early detection and rapid response to control new invasive species is crucial to the program. An integrated weed control/vegetation management approach is key to maintaining healthy, sustainable plant communities that are able to resist Noxious weed invasions. Weed mapping, field surveys, and field-staff training sessions (to learn how to identify new potential problem species) are conducted to help detect and prevent new weed problems. The integrated approach at Rocky Flats includes administrative and cultural techniques (prevention), mechanical controls, biological controls, and chemical controls. Several species of biocontrol insects have been released to assist with control of different target weed species. Monitoring is conducted to evaluate the effectiveness of control efforts and to provide information for future control efforts. The effective implementation of this integrated approach has reduced the infestation levels of many species and has kept several newly discovered invasive species from spreading and becoming larger problems at the site. (authors)

Nelson, Jody K. [Stoller LMS Team, Contractor to the U.S. Department of Energy Office of Legacy Management, 11025 Dover Street, Suite 1000, Westminster, Colorado 80021 (United States)] [Stoller LMS Team, Contractor to the U.S. Department of Energy Office of Legacy Management, 11025 Dover Street, Suite 1000, Westminster, Colorado 80021 (United States)

2013-07-01T23:59:59.000Z

18

Community Surveys Low Dose Radiation. Fernald, Ohio and Rocky Flats, Colorado  

E-Print Network (OSTI)

This report is intended to present a basic description of the data from the two community surveys and to document the text of the questions; the methods used for the survey data collection; and a brief overview of the results. Completed surveys were conducted at local communities near the Rocky Flats, Colorado and the Fernald, Ohio sites; no survey was conducted for the Brookhaven, New York site. Fernald. The Fernald sample was randomly selected from 98% of all potential residential telephones in the townships of Ross, Morgan, and Crosby. The only telephone exchanges not used for the Fernald study had 4%, or fewer, of the holders of the telephone numbers actually living in either of the three target townships. Surveying started on July 24, 2001 and finished on August 30, 2001. A total of 399 completed interviews were obtained resulting in a CASRO response rate of 41.8%. The average length of an interview was 16.5 minutes. Rocky Flats. The sample was randomly selected from all potential residential telephones ...

Mertz, C K; Johnson, S; MacGregor, D G; Satterfield, T

2002-01-01T23:59:59.000Z

19

Importance of plutonium contamination on vegetation surfaces at rocky flats, Colorado  

Science Journals Connector (OSTI)

Vegetation samples collected at Rocky Flats, Colorado were ultrasonically washed to remove attached soil and then analyzed for 239, 240Pu and 238Pu. Mean plutonium concentrations for washed grass, forb and shrub samples were 1.12, 0.61, 0.03 pCi/g, respectively. This compared to a mean of 28.6 pCi/g for unwashed vegetation samples from an earlier study conducted in the same area at Rocky Flats. The mean plutonium isotopic ratio (239,240Pu/238Pu) of 27.2 in vegetation was lower than a ratio of 65.4 in soil, indicating possible differential behavior of the plutonium isotopes in vegetation. Soil attachment to above-ground plant parts ranged from 0.0 to 0.25g soil per g plant. The potential for plutonium contamination on plant parts due to soil attachment was estimated to range from 0.0 to 206 pCi/g. Plutonium on vegetation was concluded to be the major contributor to total plutonium associated with vegetation.

W.J. Arthur III; A.W. Alldredge

1982-01-01T23:59:59.000Z

20

Preliminary surficial geologic map of the Rocky Flats Plant and vicinity, Jefferson and Boulder Counties, Colorado  

SciTech Connect

This report contains a 1:6000 scale map of the 3-mile by 4-mile rectangular area surrounding the Rocky Flats Plant. The map shows the surface deposits estimated to be at least one meter thick. The accompanying report contains a detailed description of the map units, a discussion of the Rocky Flats alluvium and landslides, and cited references. 37 references.

Shroba, R.R.; Carrara, P.E.

1994-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "rocky flats colorado" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Community Surveys: Low Dose Radiation. Fernald, Ohio and Rocky Flats, Colorado  

SciTech Connect

This report is intended to present a basic description of the data from the two community surveys and to document the text of the questions; the methods used for the survey data collection; and a brief overview of the results. Completed surveys were conducted at local communities near the Rocky Flats, Colorado and the Fernald, Ohio sites; no survey was conducted for the Brookhaven, New York site. Fernald. The Fernald sample was randomly selected from 98% of all potential residential telephones in the townships of Ross, Morgan, and Crosby. The only telephone exchanges not used for the Fernald study had 4%, or fewer, of the holders of the telephone numbers actually living in either of the three target townships. Surveying started on July 24, 2001 and finished on August 30, 2001. A total of 399 completed interviews were obtained resulting in a CASRO response rate of 41.8%. The average length of an interview was 16.5 minutes. Rocky Flats. The sample was randomly selected from all potential residential telephones in Arvada and from 99% of the potential telephones in Westminster. Surveying started on August 10, 2001 and finished on September 25, 2001. A total of 401 completed interviews were obtained with a CASRO response rate of 32.5%. The average length of an interview was 15.7 minutes. Overall, respondents hold favorable views of science. They indicate an interest in developments in science and technology, feel that the world is better off because of science, and that science makes our lives healthier, easier, and more comfortable. However, respondents are divided on whether science should decide what is safe or not safe for themselves and their families. The majority of the respondents think that standards for exposure to radiation should be based on what science knows about health effects of radiation and on what is possible with today's technology. Although few respondents had visited the sites, most had heard or read something about Fernald or Rocky Flat s in the media. Impressions of the sites tend to be negative. Most respondents feel that overall their community would be better off without the site. However, when asked about the economic future of their community after cleanup and closure of the site, only 31-43% thought that it will be better, 47-56% thought their local economy will be about the same.

C. K. Mertz; James Flynn; Donald G. MacGregor; Theresa Satterfield; Stephen M. Johnson; Seth Tuler; Thomas Webler

2002-10-16T23:59:59.000Z

22

Physicochemical Speciation of Americium in Soils from Rocky Flats, Colorado, USA  

Science Journals Connector (OSTI)

The objective of the research was to characterize the 241Am distribution in six operationally defined chemical and mineralogical phases of soil samples taken from the Rocky Flats Environmental Technology Site (RF...

S. A. Ibrahim; W. R. Salazar

2000-02-01T23:59:59.000Z

23

A multispectral scanner survey of the Rocky Flats Environmental Technology Site and surrounding area, Golden, Colorado  

SciTech Connect

Aerial multispectral scanner imagery was collected of the Rocky Flats Environmental Technology Site in Golden, Colorado, on June 3, 5, 6, and 7, 1994, using a Daedalus AADS1268 multispectral scanner and coincident aerial color and color infrared photography. Flight altitudes were 4,500 feet (1372 meters) above ground level to match prior 1989 survey data; 2,000 feet (609 meters) above ground level for sitewide vegetation mapping; and 1,000 feet (304 meters) above ground level for selected areas of special interest. A multispectral survey was initiated to improve the existing vegetation classification map, to identify seeps and springs, and to generate ARC/INFO Geographic Information System compatible coverages of the vegetation and wetlands for the entire site including the buffer zone. The multispectral scanner imagery and coincident aerial photography were analyzed for the detection, identification, and mapping of vegetation and wetlands. The multispectral scanner data were processed digitally while the color and color infrared photography were manually photo-interpreted to define vegetation and wetlands. Several standard image enhancement techniques were applied to the multispectral scanner data to assist image interpretation. A seep enhancement was applied and a color composite consisting of multispectral scanner channels 11, 7, and 5 (thermal infrared, mid-infrared, and red bands, respectively) proved most useful for detecting seeps, seep zones, and springs. The predawn thermal infrared data were also useful in identifying and locating seeps. The remote sensing data, mapped wetlands, and ancillary Geographic Information System compatible data sets were spatially analyzed for seeps.

Brewster, S.B. Jr.; Brickey, D.W.; Ross, S.L.; Shines, J.E.

1997-04-01T23:59:59.000Z

24

The behavior of radionuclides in the soils of Rocky Flats, Colorado  

Science Journals Connector (OSTI)

Radionuclide contamination of soils in Rocky Flats, Colorado, resulted from leaking drums of Pu-contaminated oil stored at an outdoor area. To evaluate the mechanisms of radionuclide transport from the contaminated soils to groundwater, an advanced monitoring system was installed across a toposequence. The impact of natural rain, snowmelt, and large-scale rain simulations on the mobility and distribution of the radionuclides in soil interstitial water was studied. The distribution of radionuclides during the monitoring period from 1993 to 1995 suggested that Pu-239 + 240 and Am241 are largely immobile in semi-arid soils. Large-scale rain simulations with a 100-year recurrence interval occasionally remobilized large fluxes of radionuclides that constitute between 1 and 3.3% of the stored Pu and Am in these soils. Fractionation of Pu-239 + 240 and Am-241 to different particle sizes in the soil interstitial water suggested that most of the radionuclides (8397%) were associated with suspended particles, whereas the level of radionuclides associated with colloidal (0.45 ?m > X > 1nm) and nonfilterable (< 1 nm) fractions ranged from 1.5 to 15%.

M.I. Litaor; G. Barth; E.M. Zika; G. Litus; J. Moffitt; H. Daniels

1998-01-01T23:59:59.000Z

25

Case History of a Clean Water Act Compliance Agreement at the Rocky Flats Environmental Technology Site near Golden, Colorado  

SciTech Connect

A major Clean Water Act (CWA) Federal Facilities Compliance Agreement was signed on March 25, 1991 by the US Department of Energy, Rocky Flats Field Office (DOE, RFFO) and the Water Enforcement Division of the Environmental Protection Agency (EPA), Region VIII. The agreement revised the Rocky Flats Plant`s National Pollutant Discharge Elimination System (NPDES) permit and arose from pemittee-requested changes in effluent monitoring points and permit violations, most notably the February 22, 1989 Chromic Acid Incident. The Rocky Flats Plant, now called the Rocky Flats Environmental Technology Site (Site) near Golden Colorado was operated at that time by Rockwell International Corporation, who later plead guilty to six misdemeanor and felony counts of the CWA (the aforementioned NPDES permit violations) and paid a $4 million fine on March 26, 1992. The Compliance Agreement, hereafter referred to as the NPDES FFCA, called for three separate remedial action plans and contained a schedule for their submittal to the EPA. The compliance plans focussed on: (1) Waste Water Treatment Plant (WWTP) performance upgrades, (2) source control and surface water protection, and (3) characterization of the impacts from past sludge disposal practices. Projects that implemented the compliance plans were initiated soon after submittal to the EPA and are forecast to complete in 1997 at a total cost of over $35 million. This paper presents a case history of NPDES FFCA compliance projects and highlights the successes, failures, and lessons learned.

Thompson, J.S.

1995-08-01T23:59:59.000Z

26

EIS-0064: Rocky Flats Plant Site, Jefferson County, Golden, Colorado (see also ERDA-1545-D)  

Energy.gov (U.S. Department of Energy (DOE))

The U.S. Department of Energy developed this statement to evaluate the site specific environmental impacts of continuing to conduct nuclear weapons production activities at the Rocky Flats Plant; alternatives for the conduct of such activities; and environmental impacts of the U.S. policy to produce nuclear weapons.

27

Rocky flats teams forming  

SciTech Connect

Bidding teams are shaping up to go after the $3.5-billion, five-year contract to manage ongoing operations and cleanup of the US Dept. of Energy`s Rocky Flats nuclear weapon plant near Denver.

NONE

1994-08-01T23:59:59.000Z

28

DOE - Office of Legacy Management -- Rocky Flats SOG  

NLE Websites -- All DOE Office Websites (Extended Search)

SOG SOG Rocky Flats Site, Colorado Rocky Flats, Colorado, Site Operations Guide All documents are Adobe Acrobat files. pdf_icon Site Operations Guide Appendixes Appendix A: Annual Site Inspection Checklist Appendix B: Example Contact Record Appendix C: Rocky Flats Site Soil Disturbance Evaluation Procedure Appendix D: Site-Specific Checklist Appendix E: Rocky Flats, Colorado, Site Erosion Control Monitoring and Maintenance Inspection Procedure Appendix F: Erosion Control Plan for Rocky Flats Property Central Operable Unit Appendix G: Wildland Fire Management Plan for the Rocky Flats, Colorado, Site Appendix H: Emergency Response Plan for the Rocky Flats Site Dams Appendix I: Additional Field Implementation Detail for Selected Monitoring Objectives Historic documents may contain links to outside sources. LM cannot attest

29

Cleanup at Rocky Flats  

NLE Websites -- All DOE Office Websites (Extended Search)

David L. Clark, Los Alamos National Laboratory David L. Clark, Los Alamos National Laboratory The Rocky Flats Environmental Technology Site (RFETS) is an environmental cleanup site located about 16 miles northwest of downtown Denver (Fig 1). Two decades of routine monitoring have shown that the environment around RFETS is contaminated with actinide elements (U, Pu, Am) from site operations, [1] and RFETS has been designated by the U.S. Environmental Protection Agency (EPA) as a Superfund cleanup site. Until December 1989, the Rocky Flats Plant made components for nuclear weapons using various radioactive and hazardous materials, including plutonium, uranium and beryllium. Nearly 40 years of nuclear weapons production left behind a legacy of contaminated facilities, soils, and ground water. More than 2.5 million people live within a 50 mile radius of the site; 300,000 of those live in the Rocky Flats watershed.

30

DOE - Office of Legacy Management -- Rocky Benefits  

Office of Legacy Management (LM)

Colorado > Rocky Benefits Rocky Flats Site, Colorado Benefits Administration Rocky Flats Benefits Administration Rocky Flats Benefits Center P.O Box 9735 Providence, RI 02940 Phone...

31

Independent Oversight Review, Rocky Flats Environmental Technology...  

Office of Environmental Management (EM)

Review, Rocky Flats Environmental Technology Site - March 2000 Independent Oversight Review, Rocky Flats Environmental Technology Site - March 2000 March 2000 Review of the Rocky...

32

DOE - Office of Legacy Management -- Rocky Flats Regulatory Documents  

NLE Websites -- All DOE Office Websites (Extended Search)

Regulatory Documents Regulatory Documents Rocky Flats Site, Colorado Regulatory Documents All documents are Adobe Acrobat files. pdf_icon Notification that GS01 is no longer an RFLMA Point of Compliance (POC) Third Five-Year Review Report for the Rocky Flats Site Rocky Flats Legacy Management Agreement Environmental Covenant, November 14, 2011 Corrective Action Decision/Record of Decision Amendment for Rocky Flats Plant (USDOE) Central Operable Unit Proposed Plan for the Rocky Flats CAD/ROD Amendment (June 2011) Second Five-Year Review Report for the Rocky Flats Site Corrective Action Decision/Record of Decision for Rocky Flats Plant (USDOE) Peripheral Operable Unit and Central Operable Unit Rocky Flats Environmental Technology Site Proposed Plan Present Landfill Monitoring and Maintenance Plan

33

Closing Rocky Flats by 2006  

SciTech Connect

Safely accelerating the closure of Rocky Flats to 2006 is a goal shared by many: the State of Colorado, the communities surrounding the site, the U.S. Congress, the Department of Energy, Kaiser-Hill and its team of subcontractors, the site's employees, and taxpayers across the country. On June 30, 2000, Kaiser-Hill (KH) submitted to the Department of Energy (DOE), KH's plan to achieve closure of Rocky Flats by December 15, 2006, for a remaining cost of $3.96 billion (February 1, 2000, to December 15, 2006). The Closure Project Baseline (CPB) is the detailed project plan for accomplishing this ambitious closure goal. This paper will provide a status report on the progress being made toward the closure goal. This paper will: provide a summary of the closure contract completion criteria; give the current cost and schedule variance of the project and the status of key activities; detail important accomplishments of the past year; and discuss the challenges ahead.

Tuor, N. R.; Schubert, A. L.

2002-02-26T23:59:59.000Z

34

Enforcement Letter - Rocky Flats  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2000 1, 2000 Mr. Robert G. Card [ ] Kaiser-Hill Company, L.L.C Rocky Flats Environmental Technology Site 10808 Highway 93, Unit B Golden, CO 80403-8200 Subject: Enforcement Letter Dear Mr. Card: This letter refers to an evaluation by the Department of Energy (DOE) of noncompliance report number NTS-RFO--KHLL-SITEWIDE-2000-0005, which describes noncompliances with the design and procurement requirements of 10 CFR 830.120 (Quality Assurance Rule). 10 CFR 830.120(c)(2)(iii) requires that procured items and services shall meet established requirements and perform as required; 10 CFR 830.120(c)(2)(ii) requires that design work including changes, shall incorporate applicable requirements and design bases; 10 CFR 830.120(c)(2)(iv) requires that inspection and testing of specified items, services, and processes shall be conducted

35

EA-1146: Radioactive Waste Storage at Rocky Flats Environmental Technology  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

46: Radioactive Waste Storage at Rocky Flats Environmental 46: Radioactive Waste Storage at Rocky Flats Environmental Technology Site, Golden, Colorado EA-1146: Radioactive Waste Storage at Rocky Flats Environmental Technology Site, Golden, Colorado SUMMARY This EA evaluates the environmental impacts of the proposal to convert buildings at the U.S. Department of Energy Rocky Flats Environmental Technology Site from their former uses to interim waste storage facilities in order to increase storage capacity for low-level waste, low-level mixed waste, transuranic waste, and transuranic mixed waste. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD April 9, 1996 EA-1146: Finding of No Significant Impact Radioactive Waste Storage at Rocky Flats Environmental Technology Site, Golden, Colorado

36

Rocky Flats Compliance Program; Technology summary  

SciTech Connect

The Department of Energy (DOE) established the Office of Technology Development (EM-50) (OTD) as an element of Environmental Restoration and Waste Management (EM) in November 1989. The primary objective of the Office of Technology Development, Rocky Flats Compliance Program (RFCP), is to develop altemative treatment technologies for mixed low-level waste (wastes containing both hazardous and radioactive components) to use in bringing the Rocky Flats Plant (RFP) into compliance with Federal and state regulations and agreements. Approximately 48,000 cubic feet of untreated low-level mixed waste, for which treatment has not been specified, are stored at the RFP. The cleanup of the Rocky Flats site is driven by agreements between DOE, the Environmental Protection Agency (EPA), and the Colorado Department of Health (CDH). Under these agreements, a Comprehensive Treatment and Management Plan (CTMP) was drafted to outline the mechanisms by which RFP will achieve compliance with the regulations and agreements. This document describes DOE`s strategy to treat low-level mixed waste to meet Land Disposal Restrictions and sets specific milestones related to the regulatory aspects of technology development. These milestones detail schedules for the development of technologies to treat all of the mixed wastes at the RFP. Under the Federal Facilities Compliance Act (FFCA), the CTMP has been incorporated into Rocky Flats Plant Conceptual Site Treatment Plan (CSTP). The CSTP will become the Rocky Flats Plant site Treatment Plan in 1995 and will supersede the CTMP.

NONE

1994-02-01T23:59:59.000Z

37

Resumption of thermal stabilization of plutonium oxide in Building 707, Rocky Flats Plant, Golden, Colorado. Environmental Assessment  

SciTech Connect

The Department of Energy is proposing thermal stabilization to enhance the safe storage of plutonium at Rocky Flats Plant until decisions are made on long-term storage and disposition of the material. The proposed action is to resume thermal stabilization of pyrophoric plutonium in Building 707 at Rocky Flats Plant. Thermal stabilization would heat the pyrophoric plutonium under controlled conditions in a glovebox furnace to promote full oxidation and convert the material into stable plutonium oxide in the form of PuO{sub 2}. Other activities associated with thermal stabilization would include post-stabilization characterization of non-pyrophoric plutonium and on-site movement of pyrophoric and non-pyrophoric plutonium. This report covers; purpose and need; proposed action; alternatives to the proposed action; affected environment; environmental effects of proposed action and no action alternative; agencies and person consulted; and public participation.

Not Available

1994-02-01T23:59:59.000Z

38

An assessment of criticality safety at the Department of Energy Rocky Flats Plant, Golden, Colorado, July--September 1989  

SciTech Connect

This is a report on the 1989 independent Criticality Safety Assessment of the Rocky Flats Plant, primarily in response to public concerns that nuclear criticality accidents involving plutonium may have occurred at this nuclear weapon component fabrication and processing plant. The report evaluates environmental issues, fissile material storage practices, ventilation system problem areas, and criticality safety practices. While no evidence of a criticality accident was found, several recommendations are made for criticality safety improvements. 9 tabs.

Not Available

1989-09-01T23:59:59.000Z

39

Soil Decontamination at Rocky Flats  

Science Journals Connector (OSTI)

During the last few years, many articles have appeared in newspapers and journals concerning radioactive contamination around Rocky Flats.1,2 The amount of plutonium in the soil has been of particular interest. T...

R. L. Olsen; J. A. Hayden; C. E. Alford

1980-01-01T23:59:59.000Z

40

DOE's Former Rocky Flats Weapons Production Site to Become National  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Former Rocky Flats Weapons Production Site to Become National Former Rocky Flats Weapons Production Site to Become National Wildlife Refuge DOE's Former Rocky Flats Weapons Production Site to Become National Wildlife Refuge July 12, 2007 - 2:54pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced the transfer of nearly 4,000 acres of its former Rocky Flats nuclear weapons production site to the Department of the Interior's (DOI) U.S. Fish and Wildlife Service (FWS) for use as a National Wildlife Refuge. After more than a decade of environmental cleanup work, the transfer creates the Rocky Flats National Wildlife Refuge, 16 miles northwest of Denver, Colorado, and marks completion of the regulatory milestones to transform a formerly contaminated site into an environmental asset. "The Department of Energy's environmental cleanup of the Rocky Flats

Note: This page contains sample records for the topic "rocky flats colorado" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Status Update: Closing Rocky Flats by 2006  

SciTech Connect

Safely closing Rocky Flats by December 2006 is a goal shared by many: the State of Colorado, the communities surrounding the site, the U.S. Congress, the Department of Energy (DOE), Kaiser-Hill and its team of subcontractors, the site's employees and taxpayers across the country. This paper will: provide a status of the Closure Project to date; describe important accomplishments of the past year; describe some of the closure-enhancing technologies enabling acceleration; and discuss the remaining challenges ahead.

Tuor, N.; Schubert, A.

2003-02-25T23:59:59.000Z

42

Final Rocky Flats Cleanup Agreement, July 19, 1996 Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rocky Flats Cleanup Agreement Rocky Flats Cleanup Agreement State Colorado Agreement Type Federal Facility Agreement Legal Driver(s) CERCLA/RCRA Scope Summary Establish the regulatory framework for achieving the ultimate cleanup of the Rocky Flats Site. Parties DOE; US EPA; The State of Colorado Date 7/19/1996 SCOPE * Establish the regulatory framework for achieving the ultimate cleanup of the Rocky Flats Site. * Ensure that the environmental impacts associated with activities at the Site will continue to be investigated and that appropriate response actions are taken. * Establish a procedural framework and schedule for developing, implementing, and monitoring appropriate response actions at the site. * Coordinate all of DOE's cleanup obligations under CERCLA, RCRA, and the Colorado

43

DOE - Office of Legacy Management -- Rocky Flats External Resources  

Office of Legacy Management (LM)

Rocky Flats Stewardship Council Disclaimer Rocky Flats Cold War Museum Disclaimer U.S. Fish and Wildlife Service Rocky Flats National Wildlife Refuge Disclaimer Last Updated: 51...

44

ROCKY FLATS CLOSURE PROJECT EM, AUG 2006 | Department of Energy  

Energy Savers (EERE)

ROCKY FLATS CLOSURE PROJECT EM, AUG 2006 ROCKY FLATS CLOSURE PROJECT EM, AUG 2006 Rocky Flats Closure Project-Lessons Learned-August 2006.pdf More Documents & Publications...

45

Smooth Brome Monitoring at Rocky Flats-2005 Results | Department...  

Energy Savers (EERE)

Smooth Brome Monitoring at Rocky Flats-2005 Results Smooth Brome Monitoring at Rocky Flats-2005 Results Smooth Brome Monitoring at Rocky Flats-2005 Results Smooth Brome Monitoring...

46

Observation and Responses to Post-Closure Instances of Localized Instability and Subsidence at the DOE Legacy Management Rocky Flats Site, Colorado-13052  

SciTech Connect

The former Rocky Flats Plant in Colorado began operations as part of the nation's nuclear weapons complex in the early 1950's. By the 1980's the associated heavily industrialized area covered approximately 1.2 km{sup 2} (300 acres) and was surrounded by an approximately 25.3 km{sup 2} (6,245 acre) security buffer zone. The federally owned property and adjacent offsite areas were placed on the CERCLA National Priority List in 1989. To complete closure, all buildings and other structures that composed the Rocky Flats industrial complex were removed from the surface, but remnants remain in the subsurface. Contouring and grading to return the surface to approximate conditions that were present prior to the plant's construction was completed in 2005. A goal of the final land configuration was to provide long-term surface and subsurface land stability. Several instances of localized surface subsidence or instability have occurred since the final configuration. The localized nature and the relatively small areas of observed subsidence and instability indicate that, overall, the final configuration is performing well, but responses to these occurrences and the observations that followed may be useful in planning for the closure and designing the final land configuration and post-closure monitoring at other sites. (authors)

DiSalvo, Rick; Darr, Bob; Boylan, John [Stoller LMS Team, 11025 Dover St, Suite 1000, Westminster, CO 80021 (United States)] [Stoller LMS Team, 11025 Dover St, Suite 1000, Westminster, CO 80021 (United States); Surovchak, Scott [U.S. Department of Energy, Office of Legacy Management, 11025 Dover St, Suite 1000, Westminster, CO 80021 (United States)] [U.S. Department of Energy, Office of Legacy Management, 11025 Dover St, Suite 1000, Westminster, CO 80021 (United States)

2013-07-01T23:59:59.000Z

47

Preliminary Notice of Violation , Rocky Flats Environmental Technology Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Violation , Rocky Flats Environmental Violation , Rocky Flats Environmental Technology Site - EA-96-05 Preliminary Notice of Violation , Rocky Flats Environmental Technology Site - EA-96-05 October 7, 1996 Preliminary Notice of Violation issued to Safe Sites of Colorado related to Radiological and Work Control Deficiencies associated with Two Radiological Release Events at the Rocky Flats Environmental Technology Site, (EA-96-05) Based on our evaluation of these matters, DOE has concluded that violations of DOE's Occupational Radiation Protection Rule (10 CFR 835) and Quality Assurance Rule (10 CFR 830.120) likely occurred. An enforcement conference was held with you, as well as senior management of KHLL and Rocky Mountain Remediation Services (RMRS), on September 10, 1996. This conference included a discussion of the facts and circumstances surrounding these

48

Rocky Flats Environmental Technology Site Archived Soil & Groundwater...  

Office of Environmental Management (EM)

Rocky Flats Environmental Technology Site Archived Soil & Groundwater Master Reports Rocky Flats Environmental Technology Site Archived Soil & Groundwater Master Reports Rocky...

49

Residue management at Rocky Flats  

SciTech Connect

Past plutonium production and manufacturing operations conducted at the Rocky Flats Environmental Technology Site (RFETS) produced a variety of plutonium-contaminated by-product materials. Residues are a category of these materials and were categorized as {open_quotes}materials in-process{close_quotes} to be recovered due to their inherent plutonium concentrations. In 1989 all RFETS plutonium production and manufacturing operations were curtailed. This report describes the management of plutonium bearing liquid and solid wastes.

Olencz, J.

1995-12-31T23:59:59.000Z

50

Rocky Flats resumes shipments to WIPP  

NLE Websites -- All DOE Office Websites (Extended Search)

Rocky Flats Resumes Shipments to WIPP CARLSBAD, N.M., March 11, 2000 - The U.S. Department of Energy (DOE) has resumed transuranic radioactive waste shipments from DOE's Rocky...

51

Final Transuranic Waste Shipment Leaves Rocky Flats | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Transuranic Waste Shipment Leaves Rocky Flats Final Transuranic Waste Shipment Leaves Rocky Flats Final Transuranic Waste Shipment Leaves Rocky Flats April 19, 2005 - 12:23pm Addthis Cleanup Ahead of Schedule, On Track to Save Taxpayers Billions GOLDEN, CO. - A major environmental victory was achieved at the Rocky Flats Site in Golden, Colo., today when the final remaining shipment of radioactive, transuranic (TRU) waste left the property on a truck bound for an underground waste repository in New Mexico. This major milestone is another step toward the final conversion of the site to a National Wildlife Refuge managed by the U.S. Fish and Wildlife Service. "This is great news for all of Colorado, and would not have been possible without hand-in-glove cooperation between the Department of Energy, the

52

Actinide solution processing at the Rocky Flats Environmental Technology Site  

SciTech Connect

The Department of Energy (DOE) has prepared an Environmental Assessment (EA), DOE/EA-1039, for radioactive solution removal and processing at Rocky Flats Environmental Technology Site, Golden, Colorado. The proposal for solution removal and processing is in response to independent safety assessments and an agreement with the State of Colorado to remove mixed residues at Rocky Flats and reduce the risk of future accidents. Monthly public meetings were held during the scoping and preparation of the EA. The scope of the EA included evaluations of alternative methods and locations of solution processing. A comment period from February 20, 1995 through March 21, 1995 was provided to the public and the State of Colorado to offer written comment on the EA. Comments were received from the State of Colorado and the U.S. Environmental Protection Agency. A response to the agency comments is included in the Final EA.

NONE

1995-04-01T23:59:59.000Z

53

LM Records Handling System (LMRHS01) - Rocky Flats Environmental...  

Office of Environmental Management (EM)

LM Records Handling System (LMRHS01) - Rocky Flats Environmental Records Database, Office of Legacy Management LM Records Handling System (LMRHS01) - Rocky Flats Environmental...

54

Independent Oversight Special Review, Rocky Flats Closure Project...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Independent Oversight Special Review, Rocky Flats Closure Project Site - April 2001 Independent Oversight Special Review, Rocky Flats Closure Project Site - April 2001 April 2001...

55

Review of Beryllium Management Practices at Rocky Flats During...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Beryllium Management Practices at Rocky Flats During Closure Operations Review of Beryllium Management Practices at Rocky Flats During Closure Operations Administrative and...

56

Preliminary Notice of Violation , Rocky Flats Environmental Technology...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Violation , Rocky Flats Environmental Technology Site - EA-96-05 Preliminary Notice of Violation , Rocky Flats Environmental Technology Site - EA-96-05 October 7, 1996 Preliminary...

57

Landfill Cover Revegetation at the Rocky Flats Environmental...  

Energy Savers (EERE)

Landfill Cover Revegetation at the Rocky Flats Environmental Technology Site Landfill Cover Revegetation at the Rocky Flats Environmental Technology Site Landfill Cover...

58

Characterization of organic-rich colloids from surface and ground waters at the actinide-contaminated Rocky Flats Environmental Technology Site (RFETS), Colorado, USA  

Science Journals Connector (OSTI)

Colloids, i.e. nanoparticles and macromolecules, play an important role in the environmental dispersion of actinides. Thus, colloids (3kDa0.5?m) were collected and purified from three different environments, i.e. surface water, pond water and near-surface ground water at the Rocky Flats Environmental Technology Site, Colorado, where elevated actinide concentrations had previously been documented. Their chemical composition was determined in order to better understand their role in actinide migration. All three types of colloid samples were found to be similar in chemical composition, with a higher percentage of organic carbon, OC (518%), than any other measured component, and only small amounts of Si, Mn, Al, and Fe (1.5% or below). Analytically determined components account for 4056% of the colloidal matter, with water likely making up the difference. Transmission electron microscopy (TEM) images of colloidal material from all three sample types indicate the presence of cellulose or chitin, likely from plant (terrestrial and/or aquatic) material. Other major components include humic acid type particles, with only small amounts (<5%) of mineral particles. Our findings of colloids high in organic and low in inorganic matter content agree with previously reported results on Pu(IV) associated with an acidic natural macromolecular organic compound that also contains small amounts of Fe. Pu/OC and Fe/OC ratios both showed a steady decrease from surface water to pond water to groundwater, with a more marked decrease in the Fe/OC ratio, but no significant change in overall colloidal organic carbon (COC) concentrations.

Kimberly A. Roberts; Peter H. Santschi; Gary G. Leppard; M.Marcia West

2004-01-01T23:59:59.000Z

59

Rocky Flats Plant Site Environmental Report, January--December 1990  

SciTech Connect

This report provides information to the public about the impact of the Rocky Flats Plant on the environment and public health. The report contains a compliance summary, a description of environmental monitoring programs, and radiation dose estimates for the surrounding population for the period January 1 through December 31, 1990. An environmental surveillance program has been ongoing at the Rocky Flats Plant since the 1950s. Early programs focused on radiological impacts to the environment. The current program examines potential impacts to air, surface water, groundwater, and soils from radiological and nonradiological sources. Environmental operations at Rocky Flats Plant are under the jurisdiction of several local, state, and federal agencies, most notably the Colorado Department of Health, Environmental Protection Agency, and Department of Energy. A variety of reports are prepared at different intervals for these and other agencies in addition to the annual environmental report.

Cirrincione, D.A.; Costain, D.B. [EG and G Rocky Flats, Inc., Golden, CO (United States). Rocky Flats Plant

1990-12-31T23:59:59.000Z

60

Rocky Flats ash test procedure (sludge stabilization)  

SciTech Connect

Rocky Flats Ash items have been identified as the next set of materials to be stabilized. This test is being run to determine charge sizes and soak times to completely stabilize the Rocky Flats Ash items. The information gathered will be used to generate the heating rampup cycle for stabilization. This test will also gain information on the effects of the glovebox atmosphere (moisture) on the stabilized material. This document provides instructions for testing Rocky Flats Ash in the HC-21C muffle furnace process.

Winstead, M.L.

1995-09-14T23:59:59.000Z

Note: This page contains sample records for the topic "rocky flats colorado" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

NATURAL HERITAGE RESOURCES OF THE ROCKY FLATS ENVIRONMENTAL TECHNOLOGY SITE  

E-Print Network (OSTI)

NATURAL HERITAGE RESOURCES OF THE ROCKY FLATS ENVIRONMENTAL TECHNOLOGY SITE AND THEIR CONSERVATION Methods 3 Rocky Flats Conservation Site Description 10 Walnut Creek Conservation Site Description 22 Rocky.S. Department of Energy's Rocky Flats Field Office for making this report possible. In particular, Dr. John

62

Preliminary Notice of Violation, Rocky Flats Environmental Technology Site- EA-96-05  

Energy.gov (U.S. Department of Energy (DOE))

Preliminary Notice of Violation issued to Safe Sites of Colorado related to Radiological and Work Control Deficiencies associated with Two Radiological Release Events at the Rocky Flats Environmental Technology Site, (EA-96-05)

63

The effect of a small creek valley on drainage flows in the Rocky Flats region  

SciTech Connect

Regional scale circulation and mountain-plain interactions and effects on boundary layer development are important for understanding the fate of an atmospheric release from Rocky Flats, Colorado. Numerical modeling of Front Range topographic effects near Rocky Flats have shown that though the Front Range dominates large scale flow features, small-scale terrain features near Rocky Flats are important to local transport during nighttime drainage flow conditions. Rocky Flats has been the focus of interest for the Department of Energy`s Atmospheric Studies in Complex Terrain (ASCOT) program.

Porch, W. [Los Alamos National Lab., NM (United States)

1996-12-31T23:59:59.000Z

64

Rocky Flats Ash test procedure (sludge stabilization)  

SciTech Connect

Rocky Flats Ash items have been identified as the next set of materials to be stabilized. This test is being run to determine charge sizes and soak times to completely stabilize the Rocky Flats Ash items. The information gathered will be used to generate the heating rampup cycle for stabilization. The test will provide information to determine charge sizes, soak times and mesh screen sizes (if available at time of test) for stabilization of Rocky Flats Ash items to be processed in the HC-21C Muffle Furnace Process. Once the charge size and soak times have been established, a program for the temperature controller of the HC-21C Muffle Furnace process will be generated for processing Rocky Flats Ash.

Funston, G.A.

1995-06-14T23:59:59.000Z

65

Neptunium processing at the Rocky Flats Plant  

SciTech Connect

Small quantities of neptunium-237 have been processed at the Rocky Flats Plant since 1962. This processing has involved preparation of pure neptunium oxide, metal, and metal alloys, and the recovery of neptunium-237 from a variety of residues. This report describes the processes used at Rocky Flats to recover and purify neptunium in addition to processes used for conversion to metal for casting and for rolling.

Conner, W.V.; Baaso, D.L.

1981-09-20T23:59:59.000Z

66

DECOMMISSIONING CHALLENGES AT THE ROCKY FLATS ENVIRONMENTAL TECHNOLOGY SITE  

SciTech Connect

This paper presents a discussion of the demolition of the Building 788 cluster at the Rocky Flats Environmental Technology Site (RFETS) in Golden, Colorado. The Building 788 Cluster was a Resource Conservation and Recovery Act (RCRA) permitted storage facilities and ancillary structures. Topics covered include the methods employed for Project Planning, Regulatory Compliance, Waste Management, Hazard Identification, Radiological Controls, Risk Management, Field Implementation, and Cost Schedule control, and Lessons Learned and Project Closeout.

Dorr, K. A.; Hoover, J.

2002-02-25T23:59:59.000Z

67

Rocky Flats Cleanup Agreement implementation successes and challenges  

SciTech Connect

On July 19, 1996 the US Department of Energy (DOE), State of Colorado (CDPHE), and US Environmental Protection Agency (EPA) entered into an agreement called the Rocky Flats Cleanup Agreement (RFCA) for the cleanup and closure of the Rocky Flats Environmental Technology Site (RFETS or Rocky Flats). Major elements of the agreement include: an Integrated Site-Wide Baseline; up to twelve significant enforceable milestones per year; agreed upon soil and water action levels and standards for cleanup; open space as the likely foreseeable land use; the plutonium and TRU waste removed by 2015; streamlined regulatory process; agreement with the Defense Nuclear Facilities Safety Board (DNFSB) to coordinate activities; and a risk reduction focus. Successful implementation of RFCA requires a substantial effort by the parties to change their way of thinking about RFETS and meet the deliverables and commitments. Substantial progress toward Site closure through the implementation of RFCA has been accomplished in the short time since the signing, yet much remains to be done. Much can be learned from the Rocky Flats experience by other facilities in similar situations.

Shelton, D.C.

1997-02-01T23:59:59.000Z

68

Solid waste recycling programs at Rocky Flats  

SciTech Connect

The Rocky Flats (RFP) recycling programs for solid waste materials have been in place for over ten years. Within the last three years, the programs were centralized under the direction of the Rocky Flats Waste Minimization department, with the assistance of various plant organizations (e.g., Trucking, Building Services, Regulated Waste Operations, property Utilization and Disposal and Security). Waste Minimization designs collection and transportation systems for recyclable materials and evaluates recycling markets for opportunities to add new commodities to the existing programs. The Waste Minimization department also promotes employee participation in the Rocky Flats Recycling Programs, and collects all recycling data for publication. A description of the program status as of January 1994 is given.

Millette, R.L.; Blackman, T.E.; Shepard, M.D. [EG and G Rocky Flats, Inc., Golden, CO (United States)

1994-12-31T23:59:59.000Z

69

Issues evaluation process at Rocky Flats Plant  

SciTech Connect

This report describes the issues evaluation process for Rocky Flats Plant as established in July 1990. The issues evaluation process was initiated February 27, 1990 with a Charter and Process Overview for short-term implementation. The purpose of the process was to determine the projects required for completion before the Phased Resumption of Plutonium Operations. To determine which projects were required, the issues evaluation process and emphasized risk mitigation, based on a ranking system. The purpose of this report is to document the early design of the issues evaluation process to record the methodologies used that continue as the basis for the ongoing Issues Management Program at Rocky Flats Plant.

Smith, L.C.

1992-04-16T23:59:59.000Z

70

Chemical tracking at the Rocky Flats Plant  

SciTech Connect

EG&G Rocky Flats, Inc., has developed a chemical tracking system to support compliance with the Emergency Planning and community Right-to-Know Act (EPCRA) at the Rocky Flats Plant. This system, referred to as the EPCRA Chemical Control system (ECCS), uses bar code technology to uniquely identify and track the receipt, distribution, and use of chemicals. Chemical inventories are conducted using hand-held electronic scanners to update a site wide chemical database on a VAX 6000 computer. Information from the ECCS supports preparation of the EPCRA Tier II and Form R reports on chemical storage and use.

Costain, D.B.

1994-04-01T23:59:59.000Z

71

DOE - Office of Legacy Management -- Rocky Flats Archive  

NLE Websites -- All DOE Office Websites (Extended Search)

Archive Archive Rocky Flats Site, Colorado Key Document Archive All documents are Adobe Acrobat files. pdf_icon NEPA - Rocky Flats Surface Water Configuration Environmental Assessment (EA) Site-Specific Uranium Standards Petition Site Surveillance and Maintenance Reports Quarterly Reports 2013 3rd Quarter 2nd Quarter Overview 1st Quarter Overview 2012 3rd Quarter Overview 2nd Quarter Overview 1st Quarter Overview 2011 3rd Quarter Overview 2nd Quarter Overview 1st Quarter Overview 2010 3rd Ouarter Overview 2nd Ouarter Overview 1st Quarter Overview 2009 1st Quarter Overview 2nd Ouarter Overview 3rd Quarter Overview 2008 1st Quarter Overview 2nd Quarter Overview 3rd Quarter Overview 2007 1st Quarter Overview 2nd Quarter Overview 3rd Quarter Overview 2006

72

Development of the NIST Rocky Flats Soil Standard  

Science Journals Connector (OSTI)

The National Institute of Standards and Technology (NIST) Rocky Flats Soil-II Standard reference material (SRM) ... values and uncertainties for the radionuclides in the Rocky Flats Soil II SRM.

S. Nour; K. Inn; J. Filliben

2008-07-01T23:59:59.000Z

73

Final Land Configuration for the Rocky Flats Environmental Technology Site  

SciTech Connect

Closure of the Rocky Flats Environmental Technology Site (RFETS) has been completed. The future land use of the site is designated as a National Wildlife Refuge. A joint effort between Kaiser-Hill, Department of Energy, U.S. Fish and Wildlife Service, Environmental Protection Agency, State of Colorado, and other stakeholders was initiated to provide direction for developing the final land configuration. Through early identification of issues and developing mutually agreeable solutions, the final land configuration of the site was successfully completed. (authors)

Stegen, R. L.; Kapinos, J. M.; Wehner, J. P.; Snyder, B. [Parsons, 1700 Broadway, Suite 900, Denver, Colorado 80290 (United States); Davis, R. W. [Kaiser-Hill Company, LLC, 9193 S. Jamaica, Englewood, Colorado 80112 (United States)

2006-07-01T23:59:59.000Z

74

Release fractions for Rocky Flats specific accidents  

SciTech Connect

As Rocky Flats and other DOE facilities begin the transition process towards decommissioning, the nature of the scenarios to be studied in safety analysis will change. Whereas the previous emphasis in safety accidents related to production, now the emphasis is shifting to accidents related tc decommissioning and waste management. Accident scenarios of concern at Rocky Flats now include situations of a different nature and different scale than are represented by most of the existing experimental accident data. This presentation will discuss approaches@to use for applying the existing body of release fraction data to this new emphasis. Mention will also be made of ongoing efforts to produce new data and improve the understanding of physical mechanisms involved.

Weiss, R.C.

1992-09-01T23:59:59.000Z

75

Release fractions for Rocky Flats specific accidents  

SciTech Connect

As Rocky Flats and other DOE facilities begin the transition process towards decommissioning, the nature of the scenarios to be studied in safety analysis will change. Whereas the previous emphasis in safety accidents related to production, now the emphasis is shifting to accidents related tc decommissioning and waste management. Accident scenarios of concern at Rocky Flats now include situations of a different nature and different scale than are represented by most of the existing experimental accident data. This presentation will discuss approaches to use for applying the existing body of release fraction data to this new emphasis. Mention will also be made of ongoing efforts to produce new data and improve the understanding of physical mechanisms involved.

Weiss, R.C.

1992-01-01T23:59:59.000Z

76

Independent Oversight Special Review, Rocky Flats Closure Project Site -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oversight Special Review, Rocky Flats Closure Project Oversight Special Review, Rocky Flats Closure Project Site - April 2001 Independent Oversight Special Review, Rocky Flats Closure Project Site - April 2001 April 2001 Special Review of the Rocky Flats Closure Project Site The U.S. Department of Energy (DOE) Office of Independent Environment, Safety, and Health Oversight (EH-2), within the Office of Environment, Safety and Health, conducted an independent oversight Special Review at the Rocky Flats Closure Project (RFCP). The Special Review was conducted at the request of the Rocky Flats Field Office (RFFO), which is the DOE organizational element with responsibility for the RFCP (formerly known as the Rocky Flats Environmental Technology Site). Kaiser-Hill Company, LLC (KH) is the prime contractor for the RFCP.

77

Independent Oversight Special Review, Rocky Flats Closure Project Site -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Special Review, Rocky Flats Closure Project Special Review, Rocky Flats Closure Project Site - April 2001 Independent Oversight Special Review, Rocky Flats Closure Project Site - April 2001 April 2001 Special Review of the Rocky Flats Closure Project Site The U.S. Department of Energy (DOE) Office of Independent Environment, Safety, and Health Oversight (EH-2), within the Office of Environment, Safety and Health, conducted an independent oversight Special Review at the Rocky Flats Closure Project (RFCP). The Special Review was conducted at the request of the Rocky Flats Field Office (RFFO), which is the DOE organizational element with responsibility for the RFCP (formerly known as the Rocky Flats Environmental Technology Site). Kaiser-Hill Company, LLC (KH) is the prime contractor for the RFCP. RFCP's project-oriented approach and aggressive scheduling have resulted

78

Basic TRUEX process for Rocky Flats Plant  

SciTech Connect

The Generic TRUEX Model was used to develop a TRUEX process flowsheet for recovering the transuranics (Pu, Am) from a nitrate waste stream at Rocky Flats Plant. The process was designed so that it is relatively insensitive to changes in process feed concentrations and flow rates. Related issues are considered, including solvent losses, feed analysis requirements, safety, and interaction with an evaporator system for nitric acid recycle.

Leonard, R.A.; Chamberlain, D.B.; Dow, J.A.; Farley, S.E.; Nunez, L.; Regalbuto, M.C.; Vandegrift, G.F.

1994-08-01T23:59:59.000Z

79

Microwave solidification development for Rocky Flats waste  

SciTech Connect

The Microwave Engineering Team at the Rocky Flats Plant has developed a production-scale system for the treatment of hazardous, radioactive, and mixed wastes using microwave energy. The system produces a vitreous final form which meets the acceptance criteria for shipment and disposal. The technology also has potential for application on various other waste streams from the public and private sectors. Technology transfer opportunities are being identified and pursued for commercialization of the microwave solidification technology.

Dixon, D.; Erle, R.; Eschen, V. [and others

1994-04-01T23:59:59.000Z

80

Analysis of offsite Emergency Planning Zones (EPZ) for the Rocky Flats Plant  

SciTech Connect

This project plan for Phase II summarizes the design of a project to complete analysis of offsite Emergency Planning Zones (EPZ) for the Rocky Flats Plant. Federal, state, and local governments develop emergency plans for facilities that may affect the public in the event of an accidental release of nuclear or hazardous materials. One of the purposes of these plans is to identify EPZs where actions might be necessary to protect public health. Public protective actions include sheltering, evacuation, and relocation. Agencies use EPZs to develop response plans and to determine needed resources. The State of Colorado, with support from the US Department of Energy (DOE) and Rocky Flats contractors, has developed emergency plans and EPZs for the Rocky Flats Plant periodically beginning in 1980. In Phase II, Interim Emergency Planning Zones Analysis, Maximum Credible Accident'' we will utilize the current Rocky Flats maximum credible accident (MCA), existing dispersion methodologies, and upgraded dosimetry methodologies to update the radiological EPZs. Additionally, we will develop recommendations for EPZs for nonradiological hazardous materials releases and evaluate potential surface water releases from the facility. This project will allow EG G Rocky Flats to meet current commitments to the state of Colorado and make steady, tangible improvements in our understanding of risk to offsite populations during potential emergencies at the Rocky Flats Plant. 8 refs., 5 figs., 4 tabs.

Hodgin, C.R.; Armstrong, C.; Daugherty, N.M.; Foppe, T.L.; Petrocchi, A.J.; Southward, B.

1990-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "rocky flats colorado" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Repackaging Rocky Flats Legacy Transuranic Waste  

SciTech Connect

Repackaging legacy Transuranic (TRU), Transuranic Mixed (TRM), Low Level Waste (LLW), and Low Level Mixed (LLM) waste requires good characterization skills and the ability to adapt to less than ideal conditions. Repackaging legacy waste in a facility that is not undergoing Decontamination and Decommission (D and D) is optimum. However, repackaging any waste in a D and D facility, under cold and dark conditions, can be difficult. Cold and dark conditions are when the heating and air conditioning are no longer in service and the lighting consists of strands of lights hung throughout each of the rooms. Working under these conditions adds an additional level of stress and danger that must be addressed. The use of glovebags was very useful at Rocky Flats during the D and D of many buildings. Glovebags can be adapted for many different types of wastes and unusual conditions. Repackaging of legacy TRU waste, in a D and D facility, can be accomplished safely and cost effectively with the use of glovebags. In conclusion: the use of glovebags to repackage legacy TRU, TRM, LLW, or LLM waste was done safely and cost effectively at Rocky Flats. The cost of using glovebags was minimal. Glovebags are easily adaptable to whatever the waste configuration is. The use of glovebags, for repackaging of Legacy waste, allows D and D efforts to stay on schedule and on task. Without the use of glovebags, additional gloveboxes would have been required at Rocky Flats. Larger items, such as the HEPA filters, would have required the construction of a new large item repackaging glovebox. Repackaging in glovebags allows the freedom to either locate the glovebag by the waste or locate the glovebag in a place that least impacts D and D efforts. The use of glovebags allowed numerous configurations of waste to be repackaged without the use of gloveboxes. During the D and D of the Rocky Flats facility, which was in a cold and dark stage, D and D work was not impacted by the repackaging activity. Glovebags work well in facilities that are in the process of D and D or still in full operations because glovebags are very safe and cost effective.

McTaggart, Jerri Lynne [Los Alamos National Laboratory, 115 N. Main St., Carlsbad, New Mexico, 88220 (United States)

2008-01-15T23:59:59.000Z

82

2006 Annual Ecology Report for the Rocky Flats Site  

Office of Legacy Management (LM)

Ecology Report for the Rocky Flats Site Click on the links below to access different portions of the electronic annual report. 2006 Annual Report Sections Diffuse Knapweed...

83

Unique process combination decontaminates mixed wastewater at Rocky Flats  

SciTech Connect

This paper describes the Sitewide Water Treatment Facility (SWTF) used to process environmental remediation wastewaters found at the Rocky Flats Environmental Technology Site.

Kelso, William J.; Cirillo, J. Russ

1999-08-01T23:59:59.000Z

84

Disposal of Rocky Flats residues as waste  

SciTech Connect

Work is underway at the Rocky Flats Plant to evaluate alternatives for the removal of a large inventory of plutonium-contaminated residues from the plant. One alternative under consideration is to package the residues as transuranic wastes for ultimate shipment to the Waste Isolation Pilot Plant. Current waste acceptance criteria and transportation regulations require that approximately 1000 cubic yards of residues be repackaged to produce over 20,000 cubic yards of WIPP certified waste. The major regulatory drivers leading to this increase in waste volume are the fissile gram equivalent, surface radiation dose rate, and thermal power limits. In the interest of waste minimization, analyses have been conducted to determine, for each residue type, the controlling criterion leading to the volume increase, the impact of relaxing that criterion on subsequent waste volume, and the means by which rules changes may be implemented. The results of this study have identified the most appropriate changes to be proposed in regulatory requirements in order to minimize the costs of disposing of Rocky Flats residues as transuranic wastes.

Dustin, D.F.; Sendelweck, V.S. [EG and G Rocky Flats, Inc., Golden, CO (United States). Rocky Flats Plant; Rivera, M.A. [Lamb Associates, Inc., Rockville, MD (United States)

1993-03-01T23:59:59.000Z

85

Disposal of Rocky Flats residues as waste  

SciTech Connect

Work is underway at the Rocky Flats Plant to evaluate alternatives for the removal of a large inventory of plutonium-contaminated residues from the plant. One alternative under consideration is to package the residues as transuranic wastes for ultimate shipment to the Waste Isolation Pilot Plant. Current waste acceptance criteria and transportation regulations require that approximately 1000 cubic yards of residues be repackaged to produce over 20,000 cubic yards of WIPP certified waste. The major regulatory drivers leading to this increase in waste volume are the fissile gram equivalent, surface radiation dose rate, and thermal power limits. In the interest of waste minimization, analyses have been conducted to determine, for each residue type, the controlling criterion leading to the volume increase, the impact of relaxing that criterion on subsequent waste volume, and the means by which rules changes may be implemented. The results of this study have identified the most appropriate changes to be proposed in regulatory requirements in order to minimize the costs of disposing of Rocky Flats residues as transuranic wastes.

Dustin, D.F.; Sendelweck, V.S. (EG and G Rocky Flats, Inc., Golden, CO (United States). Rocky Flats Plant); Rivera, M.A. (Lamb Associates, Inc., Rockville, MD (United States))

1993-01-01T23:59:59.000Z

86

Immobilization of Rocky Flats Graphite Fines Residues  

SciTech Connect

The Savannah River Technology Center (SRTC) is developing an immobilization process for graphite fines residues generated during nuclear materials production activities at the Rocky Flats Environmental Technology Site (Rocky Flats). The continued storage of this material has been identified as an item of concern. The residue was generated during the cleaning of graphite casting molds and potentially contains reactive plutonium metal. The average residue composition is 73 wt percent graphite, 15 wt percent calcium fluoride (CaF2), and 12 wt percent plutonium oxide (PuO2). Approximately 950 kilograms of this material are currently stored at Rocky Flats. The strategy of the immobilization process is to microencapsulate the residue by mixing with a sodium borosilicate (NBS) glass frit and heating at nominally 700 degrees C. The resulting waste form would be sent to the Waste Isolation Pilot Plant (WIPP) for disposal. Since the PuO2 concentration in the residue averages 12 wt percent, the immobilization process was required to meet the intent of safeguards termination criteria by limiting plutonium recoverability based on a test developed by Rocky Flats. The test required a plutonium recovery of less than 4 g/kg of waste form when a sample was leached using a nitric acid/CaF2 dissolution flowsheet. Immobilization experiments were performed using simulated graphite fines with cerium oxide (CeO2) as a surrogate for PuO2 and with actual graphite fines residues. Small-scale surrogate experiments demonstrated that a 4:1 frit to residue ratio was adequate to prevent recovery of greater than 4 g/kg of cerium from simulated waste forms. Additional experiments investigated the impact of varying concentrations of CaF2 and the temperature/heating time cycle on the cerium recovery. Optimal processing conditions developed during these experiments were subsequently demonstrated at full-scale with surrogate materials and on a smaller scale using actual graphite fines.In general, the recovery of cerium from the full-scale waste forms was higher than for smaller scale experiments. The presence of CaF2 also caused a dramatic increase in cerium recovery not seen in the small-scale experiments. However, the results from experiments with actual graphite fines were encouraging. A 4:1 frit to residue ratio, a temperature of 700 degrees C, and a 2 hr heating time produced waste forms with plutonium recoveries of 4 plus/minus 1 g/kg. With an increase in the frit to residue ratio, waste forms fabricated at this scale should meet the Rocky Flats product specification. The scale-up of the waste form fabrication process to nominally 3 kg is expected to require a 5:1 to 6:1 frit to residue ratio and maintaining the waste form centerline temperature at 700 degrees C for 2 hr.

Rudisill, T. S.

1998-11-06T23:59:59.000Z

87

Idaho National Engineering Laboratory code assessment of the Rocky Flats transuranic waste  

SciTech Connect

This report is an assessment of the content codes associated with transuranic waste shipped from the Rocky Flats Plant in Golden, Colorado, to INEL. The primary objective of this document is to characterize and describe the transuranic wastes shipped to INEL from Rocky Flats by item description code (IDC). This information will aid INEL in determining if the waste meets the waste acceptance criteria (WAC) of the Waste Isolation Pilot Plant (WIPP). The waste covered by this content code assessment was shipped from Rocky Flats between 1985 and 1989. These years coincide with the dates for information available in the Rocky Flats Solid Waste Information Management System (SWIMS). The majority of waste shipped during this time was certified to the existing WIPP WAC. This waste is referred to as precertified waste. Reassessment of these precertified waste containers is necessary because of changes in the WIPP WAC. To accomplish this assessment, the analytical and process knowledge available on the various IDCs used at Rocky Flats were evaluated. Rocky Flats sources for this information include employee interviews, SWIMS, Transuranic Waste Certification Program, Transuranic Waste Inspection Procedure, Backlog Waste Baseline Books, WIPP Experimental Waste Characterization Program (headspace analysis), and other related documents, procedures, and programs. Summaries are provided of: (a) certification information, (b) waste description, (c) generation source, (d) recovery method, (e) waste packaging and handling information, (f) container preparation information, (g) assay information, (h) inspection information, (i) analytical data, and (j) RCRA characterization.

NONE

1995-07-01T23:59:59.000Z

88

DOE - Office of Legacy Management -- Rocky Flats Petition  

NLE Websites -- All DOE Office Websites (Extended Search)

Petition Petition Rocky Flats Site, Colorado Site-Specific Uranium Standards Petition All documents are Adobe Acrobat files. pdf_icon U.S. Department of Energy's Proponent's Pre-Hearing Statement for Proposed Revisions to Segments 4a, 4b, and 5 of Big Dry Creek (Walnut and Woman Creeks) Regulation #38 (5 CCR 1002-38) Figure 1 Figure 2 Thermal Ionization Mass Spectrometry Uranium Results for November 2008 RFETS Waters Thermal Ionization Mass Spectrometry Uranium Results for September 2008 RFETS Waters Thermal Ionization Mass Spectrometry Uranium Results for October 2007 RFETS Waters Quantitative Evaluation of Mixture Components in RFETS Uranium Isotopic Analyses Proposed Notice Petition for Rulemaking Regarding Site-Specific Uranium Standards Rulemaking Petition Water Monitoring Locations

89

Independent Oversight Review, Rocky Flats Environmental Technology Site -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rocky Flats Environmental Technology Rocky Flats Environmental Technology Site - March 2000 Independent Oversight Review, Rocky Flats Environmental Technology Site - March 2000 March 2000 Review of the Rocky Flats Environmental Technology Site Transportation Emergency Management Program The U.S. Department of Energy (DOE) Office of Emergency Management Oversight, within the Office of Independent Oversight and Performance Assurance, conducted a transportation emergency management review and a follow-up review of the emergency management program at Rocky Flats Environmental Technology Site (RFETS) in February 2000. The primary purpose of this review was to assess the effectiveness of the Department's emergency management programs for transportation events involving hazardous materials (not related to transuranic waste or nuclear

90

Independent Oversight Review, Rocky Flats Environmental Technology Site -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Oversight Review, Rocky Flats Environmental Technology Independent Oversight Review, Rocky Flats Environmental Technology Site - March 2000 Independent Oversight Review, Rocky Flats Environmental Technology Site - March 2000 March 2000 Review of the Rocky Flats Environmental Technology Site Transportation Emergency Management Program The U.S. Department of Energy (DOE) Office of Emergency Management Oversight, within the Office of Independent Oversight and Performance Assurance, conducted a transportation emergency management review and a follow-up review of the emergency management program at Rocky Flats Environmental Technology Site (RFETS) in February 2000. The primary purpose of this review was to assess the effectiveness of the Department's emergency management programs for transportation events involving hazardous materials (not related to transuranic waste or nuclear

91

Microsoft Word - RockyFlatsPropLR111406.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 15, 2006 November 15, 2006 REPLY TO ATTN OF: IG-40 SUBJECT: Letter Report on "Alleged Waste of Funds Involving Excess Property at Rocky Flats" (INS-L-07-03) TO: Assistant Secretary for Environmental Management This is to advise you of the results of an Office of Inspector General inspection of alleged waste of funds involving excess property at the Department of Energy's (DOE's) Rocky Flats site. BACKGROUND Nuclear weapons production operations at Rocky Flats were discontinued in 1992. Subsequently, responsibility for Rocky Flats was reassigned from the Department's Office of Defense Programs to the Office of Environmental Management. In January 2000, DOE entered into a contract with Kaiser-Hill Company, LLC, for the closure of Rocky Flats by

92

Rocky Flats Closure Unit Cost Data  

SciTech Connect

The Rocky Flats Closure Project has completed the process of stabilizing residual nuclear materials, decommissioning nuclear facilities, remediating environmental media and closing the Rocky Flats Site (Site). The project cost approximately $4.1 B and included the decommissioning of over 700 structures including 5 major plutonium facilities and 5 major uranium facilities, shipping over 14,600 cubic meters of transuranic and 565,000 cubic meters of low level radioactive waste, and remediating a 385-acre industrial area and the surrounding land. Actual costs were collected for a large variety of closure activities. These costs can be correlated with metrics associated with the facilities and environmental media to capture cost factors from the project that could be applicable to a variety of other closure projects both within and outside of the Department of Energy's weapons complex. The paper covers four general topics: the process to correlate the actual costs and metrics, an example of the correlated data for one large sub-project, a discussion of the results, and the additional activities that are planned to correlate and make this data available to the public. The process to collect and arrange the project control data of the Closure Project relied on the actual Closure Project cost information. It was used to correlate these actual costs with the metrics for the physical work, such as building area or waste generated, to support the development of parametric cost factors. The example provides cost factors for the Industrial Sites Project. The discussion addresses the strengths and weaknesses of the data, followed by a section identifying future activities to improve and extend the analyses and integrate it within the Department's Environmental Cost Analysis System. (authors)

Sanford, P.C. [1129 Business Parkway South, Westminister, MD (United States); Skokan, B. [United States Department of Energy, Washington, DC (United States)

2007-07-01T23:59:59.000Z

93

Future is new focus at energy department`s Rocky Flats facility  

SciTech Connect

After several years of intensive effort to address radioactive pollution threatening nearby communities, officials at the Energy Department`s Rocky Flats plant now are turning their attention to the site`s plutonium buildings and finding a cleanup challenge of equally daunting proportions. Containing and mopping up off-site soil and water contamination remains the first priority at the Colorado facility, but site environmental managers say the huge volumes of plutonium and associated radioactive waste stored in Rocky Flats` aging building pose increasingly urgent safety concerns.

Lobsenz, G.

1993-11-12T23:59:59.000Z

94

Finding of no significant impact. Consolidation and interim storage of special nuclear material at Rocky Flats Environmental Technology Site  

SciTech Connect

The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA -- 1060, for the consolidation, processing, and interim storage of Category I and II special nuclear material (SNM) in Building 371 at the Rocky Flats Environmental Technology Site (hereinafter referred to as Rocky Flats or Site), Golden, Colorado. The scope of the EA included alternatives for interim storage including the no action alternative, the construction of a new facility for interim storage at Rocky Flats, and shipment to other DOE facilities for interim storage.

NONE

1995-06-01T23:59:59.000Z

95

Overview of imporved criticality safety limits at the Rocky Flats plant  

SciTech Connect

This paper provides an overview of improved criticality safety limits developed for nuclear operations at the Rocky Flats plant. A concern that some limits were ambiguous and too complex has been resolved by involving the process operators (addressing human factors) in the limit development process. In the summer of 1989, there was a public concern that a criticality accident may have occurred and gone undetected at the Rocky Flats plant near Golden, Colorado. To resolve this concern, the US Department of Energy (DOE) asked Scientech, Inc., to assemble an independent review team and assess the concern. The Scientech team concluded that there was no indication that a criticality accident had ever occurred at the Rocky Flats plant. However, the team did identify inadequate safety conditions and practices and recommended corrective actions.

Grethel, T.E.; Moon, N.A. (Department of Energy, Golden, CO (United States)); Brown, C.L. (M.H. Chew Associates, Inc., Golden, CO (United States))

1993-01-01T23:59:59.000Z

96

Analysis of offsite emergency planning zones for the Rocky Flats Plant  

SciTech Connect

The objective of this report is to fully document technical data and information that have been developed to support offsite emergency planning by the State of Colorado for potential accidents at the Rocky Flats Plant. Specifically, this report documents information and data that will assist the State of Colorado in upgrading its radiological emergency planning zones for Rocky Flats Plant. The Colorado Division of Disaster Emergency Services (DODES) and the Colorado Department of Health (CDH) represent the primary audience for this report. The secondary audience for this document includes the Rocky Flats Plant; federal, State, and local governmental agencies; the scientific community; and the interested public. Because the primary audience has a pre-existing background on the subject, this report assumes some exposure to emergency planning, health physics, and dispersion modeling on the part of the reader. The authors have limited their assumptions of background knowledge as much as possible, recognizing that the topics addressed in the report may be new to some secondary audiences.

Hodgin, C.R.; Daugherty, N.M.; Smith, M.L. (EG and G Rocky Flats, Inc., Golden, CO (United States). Rocky Flats Plant); Bunch, D.; Toresdahl, J.; Verholek, M.G. (TENERA, L.P., Knoxville, TN (United States))

1991-01-01T23:59:59.000Z

97

Commercial Decommissioning at DOE's Rocky Flats  

SciTech Connect

Due in large part to the number of nuclear facilities that make up the DOE complex, DOE-EM work has historically been paperwork intensive and driven by extensive regulations. Requirements for non-nuclear facilities are often grouped with those of nuclear facilities, driving up costs. Kaiser-Hill was interested in applying a commercial model to demolition of these facilities and wanted to apply necessary and sufficient standards to the work activities, but avoid applying unnecessary requirements. Faced with demolishing hundreds of uncontaminated or non-radiologically contaminated facilities, Kaiser-Hill has developed a subcontracting strategy to drastically reduce the cost of demolishing these facilities at Rocky Flats. Aiming to tailor the demolition approach of such facilities to more closely follow commercial practices, Kaiser-Hill recently released a Request for Proposals (RFP) for the demolition of the site's former central administration facility. The RFP significantly reduced requirements for compliance with specific DOE directives. Instead, the RFP required subcontractors to comply with health and safety requirements commonly found in the demolition of similar facilities in a commercial setting. This resulted in a number of bids from companies who have normally not bid on DOE work previously and at a reduced cost over previous approaches. This paper will discuss the details of this subcontracting strategy.

Freiboth, C.; Sandlin, N.; Schubert, A.; Hansen, S.

2002-02-25T23:59:59.000Z

98

Rocky Flats Former Construction Workers, Construction Worker Screening  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rocky Flats Former Construction Workers, Construction Worker Rocky Flats Former Construction Workers, Construction Worker Screening Projects Rocky Flats Former Construction Workers, Construction Worker Screening Projects Project Name: Building Trades National Medical Screening Program Covered DOE Site: Rocky Flats Worker Population Served: Construction Workers Principal Investigator: Knut Ringen, DrPH, MHA, MPH Toll-free Telephone: (800) 866-9663 Local Outreach Office: Dwayne Adkins 7510 W. Mississippi Ave., Suite 230 Lakewood, CO 80226 Website: http://www.btmed.org This project is intended to provide free medical screening to former workers in the building trades (construction workers). The screening targets health problems resulting from exposures, including asbestos, beryllium, cadmium, chromium, lead, mercury, noise, radiation, silica

99

Microsoft Word - RockyFlatsCRO20030221.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

300,000 Block Grant to the 300,000 Block Grant to the Rocky Flats Community Reuse Organization Money Will Be Used To Develop Comprehensive Refuge Plan for Rocky Flats WASHINGTON, DC - The Department of Energy (DOE) today announced that it will award $300,000 to the Rocky Flats Coalition of Local Governments. A CRO is an organization recognized by the Energy Department that can apply for funding for programs that can modify the impacts of workforce restructuring at its facilities and reduce community dependence on the department's activities. This grant will enable the community reuse organization (CRO) to continue to play a critical role in working with the Energy Department on the development of a comprehensive refuge plan for Rocky Flats, review cleanup and closure documents to ensure that they meet long-term

100

Benchmarking and performance improvement at Rocky Flats Technology Site  

SciTech Connect

The Rocky Flats Environmental Technology Site has initiated a major work process improvement campaign using the tools of formalized benchmarking and streamlining. This paper provides insights into some of the process improvement activities performed at Rocky Flats from November 1995 through December 1996. It reviews the background, motivation, methodology, results, and lessons learned from this ongoing effort. The paper also presents important gains realized through process analysis and improvement including significant cost savings, productivity improvements, and an enhanced understanding of site work processes.

Elliott, C. [Kaiser-Hill Co., (United States); Doyle, G. [EG and G Rocky Flats, Inc., Golden, CO (United States); Featherman, W.L. [Project Performance Corp. (United States)

1997-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "rocky flats colorado" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Rocky Flats Site Expands Solar Power for Treating Groundwater | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rocky Flats Site Expands Solar Power for Treating Groundwater Rocky Flats Site Expands Solar Power for Treating Groundwater Rocky Flats Site Expands Solar Power for Treating Groundwater April 17, 2013 - 1:26pm Addthis Subcontractor personnel install solar panels and other infrastructure on a 40-foot conex box that houses the batteries and control equipment for the 6 kilowatt photovoltaic system that powers the ETPTS groundwater treatment system. Subcontractor personnel install solar panels and other infrastructure on a 40-foot conex box that houses the batteries and control equipment for the 6 kilowatt photovoltaic system that powers the ETPTS groundwater treatment system. DOE was able to minimize impacts to the habitat of a federally protected mouse and provide the potential for relatively easy relocation by mounting the solar panels on the side of the conex box that houses the batteries and other system equipment.

102

Rocky Flats Site Expands Solar Power for Treating Groundwater | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rocky Flats Site Expands Solar Power for Treating Groundwater Rocky Flats Site Expands Solar Power for Treating Groundwater Rocky Flats Site Expands Solar Power for Treating Groundwater April 17, 2013 - 1:26pm Addthis Subcontractor personnel install solar panels and other infrastructure on a 40-foot conex box that houses the batteries and control equipment for the 6 kilowatt photovoltaic system that powers the ETPTS groundwater treatment system. Subcontractor personnel install solar panels and other infrastructure on a 40-foot conex box that houses the batteries and control equipment for the 6 kilowatt photovoltaic system that powers the ETPTS groundwater treatment system. DOE was able to minimize impacts to the habitat of a federally protected mouse and provide the potential for relatively easy relocation by mounting the solar panels on the side of the conex box that houses the batteries and other system equipment.

103

Hydrogeologic characterization report for the Rocky Flats environmental technology site  

SciTech Connect

The Denver groundwater basin encompasses approximately 6,700 square miles, extending east from the Front Range of the Rocky Mountains. This structural basin contains four Cretaceous bedrock aquifers overlain by a regional Quaternary alluvial aquifer. The Rocky Flats Site is located on the northwest margin of the basin. The shallow groundwater system at the Rocky Flats Site is divided into upper and lower hydrostratigraphic units (UHSU and LHSU, respectively). The UHSU at the Rocky Flats site comprises Quaternary alluvium, colluvium, valley-fill alluvium, artificial fill, weathered bedrock of the undifferentiated Arapahoe and Laramie formations and all sandstones that are hydraulically connected with overlying surficial groundwater. The LHSU comprises unweathered claystone with interbedded siltstones and sandstones of the undifferentiated Arapahoe and Laramie formations. The contact separating the UHSU and LHSU is identified as the base of the weathered zone. The separation of hydrostratigraphic units is supported by the contrasting permeabilities of the units comprising the UHSU and LHSU, well hydrograph data indicating that the units respond differently to seasonal recharge events, and geochemical data reflecting distinct major ion chemistries in the groundwaters of the UHSU and LHSU. Surface-water/groundwater interactions at the Rocky Flats site generally respond to seasonal fluctuations in precipitation, recharge, groundwater storage, and stream and ditch flow. Effluent conditions are dominant in the spring along western stream segments and influent conditions are common in the late summer and fall along most stream reaches.

Reeder, D.C.; Burcar, S. [S.M. Stoller Corp., Boulder, CO (United States); Smith, R. [RMRS, Golden, CO (United States)] [and others

1996-12-31T23:59:59.000Z

104

Rocky Flats Plant site environmental report, January--December 1991  

SciTech Connect

This report provides information to the public about the impact of the Rocky Flats Plant on the environment and public health. The report contains a compliance summary, 4 description of environmental monitoring programs, and radiation dose estimates for the surrounding population for the period January 1 through December 31, 1991. An environmental surveillance program has been ongoing at the Rocky Flats Plant since the 1950s. Early programs focused on radiological impacts to the environment. The current program not only examines potential impacts to air surface water, groundwater, and soils from radiological and nonradiological sources, but also includes ecological studies and environmental remediation programs.

Cirrncione, D.A.; Erdmann, N.L. [eds.

1991-12-31T23:59:59.000Z

105

Site wide integration of the Rocky Flats closure project  

SciTech Connect

The prime contractor for the Rocky Flats Closure Project (RFCP), Kaiser-Hill, in concert with the Department of Energy--Rocky Flats Field Office (DOE-RFFO) has applied a fully integrated, life-cycle, critical path schedule and work planning system to manage the work that is required to close the Site. The closure of the Site is complex, in that it houses over 700 facilities, 19,600 kilograms of Special Nuclear Material (Plutonium and Uranium), and over 160,000 cubic meters of Transuranic, Low Level, and Hazardous Waste. The deactivation, decommissioning, decontaminating, and demolition of this large number of facilities, while at the same time accommodating difficult on-going activities, significantly increases the sophistication required in the planning process. The Rocky Flats team has overcome these difficulties by establishing a money oriented critical path process, to provide a least-cost avenue to supporting on-going activities and a line-of-balance process for production oriented activities. These processes, when integrated with a typical activity-based project planning system, guide the way to the shortest and most cost-effective course for the closure of the Rocky Flats Site.

Burdge, L.F.; Golan, P.

1998-06-01T23:59:59.000Z

106

TGS measurements of pyrochemical salts at Rocky Flats  

SciTech Connect

A new skid-mounted tomographic gamma scanner (TGS) was designed to assist in the decommissioning of Rocky Flats Building 37 1, This instrument was used to assay pyrochemical salts as a prerequisite for disposal at the Waste Isolation Pilot Plant (WIPP). The following paper discusses measurement challenges and results from the first year of operation of the instrument.

Mercer, D. J. (David J.); Hansen, J. S. (J. Steven); Lestone, J. P. (John P.); Prettyman, T. H. (Thomas H.)

2001-01-01T23:59:59.000Z

107

Adsorption study for uranium in Rocky Flats groundwater  

SciTech Connect

Six adsorbents were studied to determine their effectiveness in removing uranium in Rocky Flats groundwater. The bench column and batch (Kd) tests showed that uranium can be removed (>99.9%) by four adsorbents. Bone Charcoal (R1O22); F-1 Alumina (granular activated alumina); BIOFIX (immobilized biological agent); SOPBPLUS (mixed metal oxide); Filtrasorb 300 (granular activated carbon); and Zeolite (clinoptilolite).

Laul, J.C.; Rupert, M.C. [EG and G Rocky Flats, Inc., Golden, CO (United States); Harris, M.J. [Science Applications International Corp., Golden, CO (United States); Duran, A. [Environmental Protection Agency, Denver, CO (United States)

1995-01-01T23:59:59.000Z

108

Transportation of pyrochemical salts from Rocky Flats to Los Alamos  

SciTech Connect

Radioactive legacy wastes or residues are currently being stored on numerous Sites around the former Department of Energy`s (DOE) Nuclear Weapons Complex. Since most of the operating facilities were shut down and have not operated since before the declared end to the Cold War in 1993, the historical method for treating these residues no longer exists. The risk associated with continued storage of these residues will dramatically increase with time. Thus, the DOE was directed by the Defense Nuclear Facility Safety Board in its Recommendation 94-1 to address and stabilize these residues and established an eight year time frame for doing so. There are only two options available to respond to this requirement: (1) restart existing facilities to treat and package the residues for disposal or (2) transport the residues to another operating facility within the Complex where they can be treated and packaged for disposal. This paper focuses on one such residue type, pyrochemical salts, produced at one Complex site, the Rocky Flats Plant located northwest of Denver, Colorado. One option for treating the salts is their shipment to Los Alamos, New Mexico, for handling at the Plutonium Facility. The safe transportation of these salts can be accomplished at present with several shipping containers including a DOT 6M, a DOE 9968, Type A or Type B quantity 55-gallon drum overpacks, or even the TRUPACT II. The tradeoffs between each container is examined with the conclusion that none of the available shipping containers is fully satisfactory. Thus, the advantageous aspects of each container must be utilized in an integrated and efficient way to effectively manage the risk involved. 1 fig.

Schreiber, S.B.

1997-02-01T23:59:59.000Z

109

The US Department of Energy`s facility reuse at the Rocky Flats Environmental Technology Site  

SciTech Connect

This audit was initiated to determine whether the Rocky Flats Environmental Technology Site was maximizing its reuse of excess facilities.

NONE

1998-08-01T23:59:59.000Z

110

SIGNIFICANT NATURAL HERITAGE RESOURCES OF THE ROCKY FLATS ENVIRONMENTAL TECHNOLOGY SITE  

E-Print Network (OSTI)

SIGNIFICANT NATURAL HERITAGE RESOURCES OF THE ROCKY FLATS ENVIRONMENTAL TECHNOLOGY SITE to assess the ecological values of the Rock Creek drainage at the Rocky Flats Environmental Technology Site from existing data at the Rocky Flats Environmental Technology Site. 2.Perform ground surveys to rank

111

Analysis of offsite emergency planning zones for the Rocky Flats Plant. Evaluation of radiological materials, Volume 1  

SciTech Connect

The objective of this report is to fully document technical data and information that have been developed to support offsite emergency planning by the State of Colorado for potential accidents at the Rocky Flats Plant. Specifically, this report documents information and data that will assist the State of Colorado in upgrading its radiological emergency planning zones for Rocky Flats Plant. The Colorado Division of Disaster Emergency Services (DODES) and the Colorado Department of Health (CDH) represent the primary audience for this report. The secondary audience for this document includes the Rocky Flats Plant; federal, State, and local governmental agencies; the scientific community; and the interested public. Because the primary audience has a pre-existing background on the subject, this report assumes some exposure to emergency planning, health physics, and dispersion modeling on the part of the reader. The authors have limited their assumptions of background knowledge as much as possible, recognizing that the topics addressed in the report may be new to some secondary audiences.

Hodgin, C.R.; Daugherty, N.M.; Smith, M.L. [EG and G Rocky Flats, Inc., Golden, CO (United States). Rocky Flats Plant; Bunch, D.; Toresdahl, J.; Verholek, M.G. [TENERA, L.P., Knoxville, TN (United States)

1991-01-01T23:59:59.000Z

112

Health Surveillance Outcomes in Former Rocky Flats Radiation Workers  

NLE Websites -- All DOE Office Websites (Extended Search)

Surveillance of Rocky Flats Radiation Workers Surveillance of Rocky Flats Radiation Workers Janice P. Watkins 1 , Elizabeth D. Ellis 1 , F. Joseph Furman 2 , Roger B. Falk 2 , Joe M. Aldrich 2 , and Donna L. Cragle 1 ORAU Technical Report # 2006-0408 1 Oak Ridge Institute for Science and Education, Center for Epidemiologic Research; P.O. Box 117; Oak Ridge, TN 37831-0117 2 Oak Ridge Institute for Science and Education, Center for Epidemiologic Research; 9950 W. 80 th Avenue, Suite 17; Arvada, CO 80005-3914 This report was funded by Department of Energy Environmental Health Division under contract number DE-AC05-00OR22750. Table of Contents List of Figures.................................................................................................................2 List of Tables

113

Polymer solidification of mixed wastes at the Rocky Flats Plant  

SciTech Connect

The Rocky Flats Plant is pursuing polymer solidification as a viable treatment option for several mixed waste streams that are subject to land disposal restrictions within the Resource Conservation and Recovery Act provisions. Tests completed to date using both surrogate and actual wastes indicate that polyethylene microencapsulation is a viable treatment option for several mixed wastes at the Rocky Flats Plant, including nitrate salts, sludges, and secondary wastes such as ash. Treatability studies conducted on actual salt waste demonstrated that the process is capable of producing waste forms that comply with all applicable regulatory criteria, including the Toxicity Characteristic Leaching Procedure. Tests have also been conducted to evaluate the feasibility of macroencapsulating certain debris wastes in polymers. Several methods and plastics have been tested for macroencapsulation, including post-consumer recycle and regrind polyethylene.

Faucette, A.M.; Logsdon, B.W.; Lucerna, J.J.; Yudnich, R.J.

1994-02-01T23:59:59.000Z

114

Facility overview for commercial application of selected Rocky Flats facilities  

SciTech Connect

The purpose of this Facility Overview is to support the Rocky Flats Local Impacts Initiative`s Request for Interest, to solicit interest from commercial corporations for utilizing buildings 865 and 883, and the equipment contained within each building, for a commercial venture. In the following sections, this document describes the Rocky Flats Site, the buildings available for lease, the equipment within these buildings, the site services available to a tenant, the human resources available to support operations in buildings 865 and 883, and the environmental condition of the buildings and property. In addition, a brief description is provided of the work performed to date to explore the potential products that might be manufactured in Buildings 865 and 883, and the markets for these products.

NONE

1996-11-01T23:59:59.000Z

115

Implementing DOE guidance for hazards assessments at Rocky Flats Plant  

SciTech Connect

Hazards Assessments are performed for a variety of activities and facilities at Rocky Flats Plant. Prior to 1991, there was no guidance for performing Hazards Assessments. Each organization that performed Hazards Assessments used its own methodology with no attempt at standardization. In 1991, DOE published guidelines for the performance of Hazards Assessments for Emergency Planning (DOE-EPG-5500.1, ``Guidance for a Hazards Assessment Methodology``). Subsequently, in 1992, DOE published a standard for the performance of Hazards Assessments (DOE-STD-1027-92, ``Hazard Categorization and Accident Analysis, Techniques for Compliance with DOE Order 5480.23, Nuclear Safety Analysis Reports``). Although these documents are a step in the direction of standardization, there remains a great deal of interpretation and subjective implementation in the performance of Hazards Assessments. Rocky Flats Plant has initiated efforts to develop a uniform and standard process to be used for Hazards Assessments.

Zimmerman, G.A.

1993-06-01T23:59:59.000Z

116

Special Review of the Rocky Flats Closure Project Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April April 2001 Special Review of the Integrated Safety Management ISM OVERSIGHT Table of Contents EXECUTIVE SUMMARY ............................................................................... 1 1.0 INTRODUCTION ...................................................................................... 6 2.0 FOCUSED REVIEW OF THE INTEGRATED WORK CONTROL PROCESS AND LINE MANAGEMENT OVERSIGHT .............................................................................................. 8 2.1 Background ...................................................................................... 8 2.2 Line Management Oversight and Selected Other Management Systems .................................................................... 10 2.3 Rocky Flats Closure Project Integrated Work Control Process

117

Rocky Flats Plant Site Environmental Report: 1993 Highlights  

SciTech Connect

The Rocky Flats Plant Site Environmental Report provides summary information on the plant`s environmental monitoring programs and the results recorded during 1993. The report contains a compliance summary, results of environmental monitoring and other related programs, a review of environmental remediation activities, information on external gamma radiation dose monitoring, and radiation dose estimates for the surrounding population. This section provides an overview of these topics and summarizes more comprehensive discussions found in the main text of this annual report.

Not Available

1993-12-31T23:59:59.000Z

118

Inspection of management of excess personal property at Rocky Flats  

SciTech Connect

Inspection revealed that immediate management attention is needed to properly control, store, and dispose of excess personal property at Rocky Flats. Current system of operation does not allow for efficient, timely, cost effective management; current storage and disposal practices are not consistent with contract requirements or DOE policies and procedures. Other deficiencies are pointed out. Results of inspection are divided into 4 sections: contract changeover issues, moratorium issues, additional excess property issues, and award fee observations. Recommendations are outlined.

Not Available

1993-05-17T23:59:59.000Z

119

DOE - Office of Legacy Management -- Rocky  

Office of Legacy Management (LM)

Rocky Flats Site, Colorado Rocky Flats Site, Colorado A CERCLA and/or RCRA Site rkyflats_2011 Remediation at the Rocky Flats Site was conducted in accordance with Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and/or Resource Conservation and Recovery Act (RCRA) regulations. The site transferred to the Office of Legacy Management in 2008 and requires operation and maintenance of remedial action systems, routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the Rocky Flats site, view the fact sheet. Site History Site Documents Community Involvement Contact Us Rocky Flats Benefits Administration Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Administrative Record Database

120

The Rocky Flats Environmental Technology Site beryllium characterization project  

SciTech Connect

A site beryllium characterization project was completed at the Rocky Flats Environmental Technology Site (RFETS) in 1997. Information from historical reviews, previous sampling surveys, and a new sampling survey were used to establish a more comprehensive understanding of the locations and levels of beryllium contamination in 35 buildings. A feature of the sampling strategy was to test if process knowledge was a good predictor of where beryllium contamination could be found. Results revealed that this technique was effective at identifying where surface contamination levels might exceed the RFETS smear control level but that it was not effective in identifying where low concentrations of beryllium might be found.

Morrell, D.M. [Kaiser-Hill Co. LLC, Golden, CO (United States); Miller, J.R. [Radian International LLC, Los Alamos, NM (United States); Allen, D.F. [Radian International LLC, Oak Ridge, TN (United States)

1999-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "rocky flats colorado" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Meteorology program status from Rocky Flats Environmental Technology Site  

SciTech Connect

The meteorology program at Rocky Flats Environmental Technology Site (Site) has experienced significant changes the past 18 months. The purposes of the meteorology program at the Site are to (1) support Emergency Preparedness programs for assessing the transport, dispersion, and deposition of effluents actually or potentially released into the atmosphere by Site operations; and (2) provide information for onsite and offsite projects concerned with the design of environmental monitoring networks for impact assessments, environmental surveillance operations, health and safety related activities, and remediation operations. The meteorology program includes ambient monitoring, weather forecasting, climatological analyses, air dispersion modeling, and Emergency Preparedness organizational support.

Maxwell, D.R.

1996-02-01T23:59:59.000Z

122

Rockwell International's Nuclear Criticality Safety Program at the Rocky Flats Plant  

SciTech Connect

This paper describes the criticality safety program at the Rocky Flats Plant. The groups responsible for safety are named and their functions outlined. (JDH)

McCarthy, J.D.

1987-01-01T23:59:59.000Z

123

Fiscal year 1990 Rocky Flats Plant Environmental Restoration program Current-Year Work Plan  

SciTech Connect

The Rocky Flats Plant (RFP) is a nuclear weapons manufacturing facility currently operated by EG G for the US Department of Energy (DOE). RFP is located at the foot of the Rocky Mountains in Jefferson Country, Colorado. The Fiscal Year 1990 (FY90) Current-Year Work Plan (CYWP) is intended to serve as a guidance document for the Environmental Restoration (ER) and RCRA Compliance programs that will be implemented at RFP. The CYWP provides in one document any cross-references necessary to understand the interrelationships between the CYWP and the DOE Five-Year Plan (FYP), Site-Specific Plan (SSP), and other related documents. The scope of this plan includes comparison of planned FY90 ER activities to those actually achieved. The CYWP has been updated to include Colorado Department of Health (CDH), US Environmental Protection Agency (EPA), and DOE Inter-Agency Agreement ER activities. It addresses hazardous wastes, radioactive wastes, mixed wastes (radioactive and hazardous), and sanitary wastes. The CYWP also addresses facilities and sites contaminated with or used in management of those wastes.

Nielsen, T. (EG and G Rocky Flats, Inc., Golden, CO (USA)); Waage, E.; Miller, D. (Stoller (S.M.) Corp., Boulder, CO (USA))

1990-01-01T23:59:59.000Z

124

Acid precipitation and surface-water vulnerability on the western slope of the high colorado rockies  

Science Journals Connector (OSTI)

Precipitation and surface waters in a high-elevation watershed on the western slope of the Colorado Rockies were studied over a three-year...?1 in the former and 100 to 900 ?eq L?1 in the latter.

John Harts; Greg P. Lockett; Richard A. Schneider

1985-07-01T23:59:59.000Z

125

DOE Certifies Rocky Flats Cleanup "Complete" | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Certifies Rocky Flats Cleanup "Complete" Certifies Rocky Flats Cleanup "Complete" DOE Certifies Rocky Flats Cleanup "Complete" December 8, 2005 - 4:45pm Addthis Golden, CO - Deputy Secretary of Energy Clay Sell announced today that the environmental cleanup of the former Rocky Flats site has been certified complete by the U.S. Department of Energy. Certification marks the final step in the DOE's successful effort to clean up and eventually turn over the former weapons production site for use as a National Wildlife Refuge. "With today's announcement, the cleanup chapter of Rocky Flats' history is closed, while another equally important chapter is just being opened," said Deputy Secretary Sell. "This successful cleanup represents a triumph of determination and spirit of cooperation that stands as an example for

126

DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project Management Institute DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project Management Institute October 23, 2006 - 9:17am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that the Project Management Institute (PMI) has awarded its 2006 Project of the Year to DOE's Rocky Flats Environmental Technology Site. The award was presented to DOE contractor Kaiser-Hill, LLC during the PMI Global Congress Dinner 2006 on Saturday, October 21st, 2006 in Seattle, Washington. "It is a great honor for the Department of Energy's Rocky Flats safe cleanup and closure effort to be recognized with this prestigious award," James Rispoli, Assistant Secretary of Energy for Environmental

127

DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project Management Institute DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project Management Institute October 23, 2006 - 9:17am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that the Project Management Institute (PMI) has awarded its 2006 Project of the Year to DOE's Rocky Flats Environmental Technology Site. The award was presented to DOE contractor Kaiser-Hill, LLC during the PMI Global Congress Dinner 2006 on Saturday, October 21st, 2006 in Seattle, Washington. "It is a great honor for the Department of Energy's Rocky Flats safe cleanup and closure effort to be recognized with this prestigious award," James Rispoli, Assistant Secretary of Energy for Environmental

128

Enforcement Letter -Rocky Flats-08/02/2000  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, 2000 , 2000 Mr. Robert G. Card [ ] Kaiser-Hill Company, L.L.C. Rocky Flats Environmental Technology Site 10808 Highway 93, Unit B Golden, CO 80403-8200 Subject: Enforcement Letter Dear Mr. Card: This letter refers to the Department of Energy's (DOE) evaluation of potential noncompliances with the requirements of 10 CFR 830.120 (Quality Assurance Rule). The potential noncompliances involved inadequate implementation of work controls, specifically failure to perform required combustible gas surveillances. The failure to fully perform the required surveillances was identified by the contractor during a comprehensive Kaiser-Hill (KHLL) Implementation Validation Review (IVR) team verifying implementation of the Basis of Interim Operation (BIO) for Buildings 776 and

129

Enforcement Letter - Rocky Flats -07/20/1998  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, 1998 , 1998 Mr. Robert G. Card [ ] Kaiser-Hill Company, L.L.C. Rocky Flats Environmental Technology Site P.O. Box 464 Golden, CO 80402-0464 Subject: Enforcement Letter Noncompliance Reports NTS-RFO--KHLL-SITEWIDE-1997-0006 NTS-RFO--KHLL-371OPS-1997-0002 NTS-RFO--KHLL-SITEWIDE-1997-0010 NTS-RFO--KHLL-SITEWIDE-1998-0001 Dear Mr. Card: This letter refers to the Department of Energy=s (DOE) evaluation of noncompliances reported in four Noncompliance Tracking System (NTS) entries, identified in the subject line above. The four NTS reports were submitted between September 24, 1997, and March 3, 1998. The reports identified potential noncompliances with requirements of 10 CFR 830.120 (Quality Assurance Rule) and 10 CFR 835 (Radiation Protection Rule). The Office of Enforcement and Investigation evaluated these NTS reports based on the

130

Sitewide risk perspectives for the Rocky Flats Environmental Technology Site  

SciTech Connect

The US Department of Energy (DOE) has recently finalized a closure plan (originally called the Ten Year Plan) for closure and environmental cleanup of previous nuclear weapons facilities. The DOE Rocky Flats Field Office has established priorities for risk reduction work to Support closure activities, as well as addressing those hazards associated with storage and management of radioactive materials and hazardous chemicals. To provide information for future National Environmental Policy Act (NEPA) or other regulatory assessments of specific risk reduction projects identified in the Closure Plan, a risk assessment of normal operations and potential accidents was recently prepared to provide an updated baseline of the cumulative impacts to the worker, public and environment due to the Site`s operations, activities, and environmental conditions in light of the Site`s change in mission, and of future closure projects. This paper summarizes the risk assessment approach, results, and conclusions.

Olinger, S.J. [Dept. of Energy, Golden, CO (United States). Rocky Flats Field Office; Foppe, T.L. [M.H. Chew and Associates, Inc., Golden, CO (United States)

1998-05-01T23:59:59.000Z

131

Analysis of offsite Emergency Planning Zones for Rocky Flats Plant  

SciTech Connect

The purpose of this quality assurance program was to ensure the quality and technical adequacy of Phase 2 of the Analysis of Offsite Emergency Planning Zones (EPZ) for the Rocky Flats Plant project. Quality assurance was accomplished by managing and controlling the processes in the development of the product. The quality assurance task team conducted audits, reviews, and surveillances of project and related activities. This process contributed to identifying areas where the quality assurance plan was not fully implemented, areas needing improvement, and/or corrective actions resulting in a improved product. During the reviews and audits, several key areas were identified where quality assurance plan implementation needed to be improved. These areas included maintaining adequate documentation, reviewing technical results, making inputs traceable to technical results, and understanding that all personnel are responsible for quality.

Inger, J.R. (TENERA, L.P., Knoxville, TN (United States)); Brown-Strattan, M.A. (EG and G Rocky Flats, Inc., Golden, CO (United States). Rocky Flats Plant)

1991-01-01T23:59:59.000Z

132

Criticality safety management during the new mission at Rocky Flats  

SciTech Connect

Under the cleanup and waste management missions at the former United States Department of Energy (DOE) production sites, a redirection of nuclear criticality safety programs has to take place to accommodate new objectives and reduced resources. The Rocky Flats Environmental Technology Site (RFETS) provides innovative approaches to respond to the needs of its new mission. The paper provides some background on the changes in the DOE complex and expands on the steps undertaken at RFETS with the hope that some of the novel approaches could be of use at other facilities. With the demise of the Cold War, the United States Department of Energy weapons complex has transitioned from the production of nuclear material to the disposition of weapons and cleanup of former production sites. Fissionable material in stored waste, contaminated facilities and equipment, and left over inventories presents nuclear criticality safety challenges that requires careful management.

Toffer, H.; Wilson, R.E. [Safe Sites of Colorado, Golden, CO (United States)

1996-12-31T23:59:59.000Z

133

Introduction The Colorado potato beetle became a pest when settlers brought potatoes into the Rocky  

E-Print Network (OSTI)

16 Introduction The Colorado potato beetle became a pest when settlers brought potatoes into the Rocky Mountain area, the native habitat of this beetle. The beetle preferred the potato to its host weed, and now is a serious pest throughout the U.S. and Eastern Canada. The Colorado potato beetle feeds

New Hampshire, University of

134

The Department of Energy`s Rocky Flats Plant: A guide to record series useful for health-related research. Volume VI, workplace and environmental monitoring  

SciTech Connect

This is the sixth in a series of seven volumes which constitute a guide to records of the Rocky Flats Plant useful for conducting health-related research. The primary purpose of Volume VI is to describe record series pertaining to workplace and environmental monitoring activities at the Department of Energy`s (DOE) Rocky Flats Plant, now named the Rocky Flats Environmental Technology Site, near Denver, Colorado. History Associates Incorporated (HAI) prepared this guide as part of its work as the support services contractor for DOE`s Epidemiologic Records Inventory Project. This introduction briefly describes the Epidemiologic Records Inventory Project and HAI`s role in the project, provides a history of workplace and environmental monitoring practices at Rocky Flats, and identifies organizations contributing to workplace and environmental monitoring policies and activities. Other topics include the scope and arrangement of this volume and the organization to contact for access to these records. Comprehensive introductory and background information is available in Volume I. Other volumes in the guide pertain to administrative and general subjects, facilities and equipment, production and materials handling, waste management, and employee health. In addition, HAI has produced a subject-specific guide, titled The September 1957 Rocky Flats Fire. A Guide to Record Series of the Department of Energy and Its Contractors, which researchers should consult for further information about records related to this incident.

NONE

1995-08-01T23:59:59.000Z

135

The Department of Energy`s Rocky Flats Plant: A guide to record series useful for health-related research. Volume VII. Employee occupational exposure and health  

SciTech Connect

This is the seventh in a series of seven volumes which constitute a guide to records of the Rocky Flats Plant useful for conducting health-related research. The primary purpose of Volume VII is to describe record series pertaining to employee occupational exposure and health at the Department of Energy`s (DOE) Rocky Flats Plant, now named the Rocky Flats Environmental Technology Site, near Denver, Colorado. History Associates Incorporated (HAI) prepared this guide as part of its work as the support services contractor for DOE`s Epidemiologic Records Inventory Project. This introduction briefly describes the Epidemiologic Records Inventory Project and HAI`s role in the project, provides a history of occupational exposure monitoring and health practices at Rocky Flats, and identifies organizations contributing to occupational exposure monitoring and health policies and activities. Other topics include the scope and arrangement of the guide and the organization to contact for access to these records. Comprehensive introductory and background information is available in Volume 1. Other volumes in the guide pertain to administrative and general subjects, facilities and equipment, production and materials handling, environmental and workplace monitoring, and waste management. In addition, HAI has produced a subject-specific guide, titled The September 1957 Rocky Flats Fire: A Guide to Record Series of the Department of Energy and Its Contractors, which researchers should consult for further information about records related to this incident.

NONE

1995-08-01T23:59:59.000Z

136

The Department of Energy`s Rocky Flats Plant: A guide to record series useful for health-related research. Volume III, facilities and equipment  

SciTech Connect

This is the third in a series of seven volumes which constitute a guide to records of the Rocky Flats Plant useful for conducting health-related research. The primary purpose of Volume M is to describe record series pertaining to facilities and equipment at the Department of Energy`s (DOE) Rocky Flats Plant, now named the Rocky Flats Environmental Technology Site, near Denver, Colorado. History Associates Incorporated (HAI) prepared this guide as part of its work as the support services contractor for DOE`s Epidemiologic Records Inventory Project. This introduction briefly describes the Epidemiologic Records Inventory Project and HAI`s role in the project, provides a history of facilities and equipment practices at Rocky Flats, and identifies organizations contributing to facilities and equipment policies and activities. Other topics include the scope and arrangement of this volume and the organization to contact for access to these records. Comprehensive introductory and background information is available in Volume I. Other volumes in the guide pertain to administrative and general subjects, production and materials handling, workplace and environmental monitoring, employee health, and waste management. In addition, HAI has produced a subject-specific guide, titled The September 1957 Rocky Flats Fire: A Guide to Record Series of the Department of Energy and Its Contractors, which researchers should consult for further information about records related to this incident.

NONE

1995-08-01T23:59:59.000Z

137

Washing of Rocky Flats Combustible Residues (Conducted March - May 1995)  

SciTech Connect

The scope of this project is to determine the feasibility of washing plutonium-containing combustible residues using ultrasonic disruption as a method for dislodging particulate. Removal of plutonium particulate and, to a lesser extent, solubilized plutonium from the organic substrate should substantially reduce potential fire, explosion or radioactive release hazards due to radiolytic hydrogen generation or high flammability. Tests were conducted on polypropylene filters which were used as pre-filters in the rich-residue ion-exchange process at the Los Alamos Plutonium Facility. These filters are similar to the Ful-Flo{reg_sign} cartridges used at Rocky Flats that make up a substantial fraction of the combustible residues with the highest hazard rating. Batch experiments were run on crushed filter material in order to determine the amount of Pu removed by stirring, stirring and sonication, and stirring and sonication with the introduction of Pu-chelating water-soluble polymers or surfactants. Significantly more Pu is removed using sonication and sonication with chelators than is removed with mechanical stirring alone.

Mary E. Barr; Ann R. Schake; David A. Romero; Gordon D. Jarvinen

1999-03-01T23:59:59.000Z

138

DISPOSITION PATHS FOR ROCKY FLATS GLOVEBOXES: EVALUATING OPTIONS  

SciTech Connect

The Kaiser-Hill Company, LLC has the responsibility for closure activities at the Rocky Flats Environmental Technology Site (RFETS). One of the challenges faced for closure is the disposition of radiologically contaminated gloveboxes. Evaluation of the disposition options for gloveboxes included a detailed analysis of available treatment capabilities, disposal facilities, and lifecycle costs. The Kaiser-Hill Company, LLC followed several processes in determining how the gloveboxes would be managed for disposition. Currently, multiple disposition paths have been chosen to accommodate the needs of the varying styles and conditions of the gloveboxes, meet the needs of the decommissioning team, and to best manage lifecycle costs. Several challenges associated with developing a disposition path that addresses both the radiological and RCRA concerns as well as offering the most cost-effective solution were encountered. These challenges included meeting the radiological waste acceptance criteria of available disposal facilities, making a RCRA determination, evaluating treatment options and costs, addressing void requirements associated with disposal, and identifying packaging and transportation options. The varying disposal facility requirements affected disposition choices. Facility conditions that impacted decisions included radiological and chemical waste acceptance criteria, physical requirements, and measurement for payment options. The facility requirements also impacted onsite activities including management strategies, decontamination activities, and life-cycle cost.

Lobdell, D.; Geimer, R.; Larsen, P.; Loveland, K.

2003-02-27T23:59:59.000Z

139

Risk-Quantified Decision-Making at Rocky Flats  

SciTech Connect

Surface soils in the 903 Pad Lip Area of the Rocky Flats Environmental Technology Site (RFETS) were contaminated with {sup 239/240}Pu by site operations. To meet remediation goals, accurate definition of areas where {sup 239/240}Pu activity exceeded the threshold level of 50 pCi/g and those below 50- pCi/g needed definition. In addition, the confidence for remedial decisions needed to be quantified and displayed visually. Remedial objectives needed to achieve a 90 percent certainty that unremediated soils had less than a 10 percent chance of {sup 239/240}Pu activity exceeding 50-pCi/g. Removing areas where the chance of exceedance is greater than 10 percent creates a 90 percent confidence in the remedial effort results. To achieve the stipulated goals, the geostatistical approach of probability kriging (Myers 1997) was implemented. Lessons learnt: Geostatistical techniques provided a risk-quantified approach to remedial decision-making and provided visualizations of the excavation area. Error analysis demonstrated compliance and confirmed that more than sufficient soils were removed. Error analysis also illustrated that any soils above the threshold that were not removed would be of nominal activity. These quantitative approaches were useful from a regulatory, engineering, and stakeholder satisfaction perspective.

Myers, Jeffrey C. [Washington Safety Management Solutions, Aiken, South Carolina (United States)

2008-01-15T23:59:59.000Z

140

Seismic equipment qualification at Rocky Flats Plant: Lessons learned  

SciTech Connect

Seismic equipment qualification is being evaluated as a part of the Systematic Evaluation Program (SEP) at Rocky Flats Plant (RFP). Initially it was believed that the experience database developed by the Seismic Qualification Utility Group (SQUG) for commercial nuclear power plants, as outlined in their Generic Implementation Procedure (GIP), would provide a substantial benefit for the seismic adequacy verification of equipment at RFP. However, further review of the simplified guidelines contained in the GIP with respect to the specific RFP structures and components revealed substantial differences from the GIP criteria. Therefore, the number of ``outliers`` from the experience database defined in the GIP is greater than was initially anticipated. This paper presents details of the differences found between the RFP structures and components and those represented in the GIP, and the challenges presented for their evaluation at RFP. Approaches necessary to develop seismic verification data are also discussed. The discussions focus on experience with one of the nuclear facilities at RFP, Building 707. However, the conclusions are generally applicable to other similar facilities that typically comprise the RFP nuclear facilities.

Peregoy, W.; Herring, K.

1993-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "rocky flats colorado" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Independent Oversight Review of the Rocky Flats Environmental Technology Site Transportation Emergency Management Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rocky Rocky Flats Environmental Technology Site Transportation Emergency Management Program Independent Oversight Review of the March 2000 OVERSIGHT Table of Contents EXECUTIVE SUMMARY ................................................................... 1 1.0 INTRODUCTION ........................................................................... 4 2.0 RESULTS ......................................................................................... 6 Hazard Survey and Hazards Assessments .................................... 6 Program Plans and Procedures ..................................................... 7 Emergency Responder Performance and Preparation ............... 9 Offsite Interfaces ........................................................................... 10 Feedback and Continuous Improvement Process

142

VWZ-0008 - In the Matter of EG&G Rocky Flats, Inc. | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

VWZ-0008 - In the Matter of EG&G Rocky Flats, Inc. VWZ-0008 - In the Matter of EG&G Rocky Flats, Inc. VWZ-0008 - In the Matter of EG&G Rocky Flats, Inc. This decision will consider a Motion for Partial Dismissal and Limitation on Scope of Complainant's Claims filed by EG&G Rocky Flats, Inc. (EG&G) on June 13, 1997. In its motion, EG&G seeks partial dismissal of the underlying complaint and hearing request filed by Arthur Murfin (Murfin) under the Department of Energy's (DOE) Contractor Employee Protection Program, 10 C.F.R. Part 708. Murfin's request for a hearing under 10 C.F.R. § 708.9 was filed on January 27, 1997, and it has been assigned Office of Hearings and Appeals (OHA) Case No. VWA-0016. vwz0008.pdf More Documents & Publications LWA-0010 - In the Matter of Howard W. Spaletta

143

A Stochastic Advection-Diffusion Model for the Rocky Flats Soil Plutonium Data  

Science Journals Connector (OSTI)

An advection-diffusion equation with time and space dependent random coefficients is derived as a model for the plutonium concentration changes in the surface soil around the Rocky Flats Plant northwest of Denver...

Jaroslav Mohapl

2000-03-01T23:59:59.000Z

144

Comparison and evaluation of turbulence estimation schemes at Rocky Flats Plant  

SciTech Connect

The Rocky Flats Plant (RFP) routinely measures meteorological data to support Air Quality and Emergency Response activities. These data help to characterize the transport and dispersion of actual or potential airborne releases of radionuclides or other hazardous materials.

Bowen, B.M.; Pamp, S.E.

1993-10-01T23:59:59.000Z

145

Comparative risk analysis for the Rocky Flats Plant Integrated Project Planning  

SciTech Connect

The Rocky Flats Plant is developing a comprehensive planning strategy that will support transition of the Rocky Flats Plant from a nuclear weapons production facility to site cleanup and final disposition. Final disposition of the Rocky Flats Plant materials and contaminants requires consideration of the interrelated nature of sitewide problems, such as material movement and disposition, facility and land use endstates, costs, relative risks to workers and the public, and waste disposition. Comparative Risk Analysis employs both incremental risk and cumulative risk evaluations to compare risk from postulated options or endstates. Comparative Risk Analysis is an analytical tool for the Rocky Flats Plant Integrated Project Planning which can assist a decision-maker in evaluating relative risks among proposed remedial options or future endstates. It addresses the cumulative risks imposed by the Rocky Flats Plant and provides risk information, both human health and ecological, to aid in reducing unnecessary resource and monetary expenditures. Currently, there is no approved methodology that aggregates various risk estimates. Along with academic and field expert review, the Comparative Risk Analysis methodology is being reviewed and refined. A Rocky Flats Plant Risk Assessment Focus Group was established. Stakeholder involvement in the development provides an opportunity to influence the information delivered to a decision-maker. This paper discusses development of the methodology.

Jones, M.E. [EG& G Rocky Flats, Inc., Englewood, CO (United States); Shain, D.I. [EG& G Rocky Flats, Inc., Golden, CO (United States)

1994-12-31T23:59:59.000Z

146

A Regional Atmospheric Continuous CO2 Network in the Rocky Mountains (Rocky RACCOON) Panel 2. Storm Peak Laboratory (SPL), near Steamboat Springs, Colorado  

E-Print Network (OSTI)

A Regional Atmospheric Continuous CO2 Network in the Rocky Mountains (Rocky RACCOON) Panel 2. Storm in the Rocky Mountains to improve our understanding of regional carbon fluxes and to fill key gaps in the North Sep. 16, 2005. Large increases and a relatively flat profile at night indicate pooling of CO2 respired

Stephens, Britton B.

147

Comparison of {sup 241}Am, {sup 239,240}Pu, and {sup 137}Cs concentrations in soil around Rocky Flats  

SciTech Connect

Gamma spectroscopy measurements were used to estimate concentrations of {sup 241}Am and {sup 137}Cs in soil profiles to depths of 21 cm at on-site and off-site locations around the Rocky Flats Environmental Technology Site and at regional background locations east of the Front Range between Colorado`s borders with New Mexico and Wyoming. Concentrations of these radionuclides were compared with concentrations of {sup 239,240}Pu in the same samples. Concentrations of {sup 241}Am in soil from depths of 0 to 3 cm decreased in an easterly direction from more than 5.3 kBq kg{sup {minus}1} 5 to 7 km away at a rate that was nearly proportional to the inverse square of distance. Deposits of {sup 137}Cs were ubiquitous, averaging 0.12 kBq kg{sup {minus}1} in soil from depths of 0 to 3 cm, but were unevenly distributed around Rocky Flats and the regional background locations. Deviations from the uniform exponential rate at which soil concentrations of {sup 137}Cs typically decreased with depth, {minus}0.25 cm{sup {minus}1} at undisturbed sites, enabled the authors to determine that about 10% of their sampling sites had been disturbed by erosion, tillage, or other factors. The mean rate at which {sup 239,240}Pu decreased with depth was about the same, {minus}0.23 cm{sup {minus}1}, throughout the study area. Soil concentrations of {sup 241}Am decreased with depth at a similar mean rate of {minus}0.22 cm{sup {minus}1} at locations close to the 903 pad where measurements were robust. Ratios between {sup 241}Am or {sup 239,240}Pu and {sup 137}Cs proved more useful for delineating the extent and pattern of contamination from Rocky Flats than did activity concentrations in soil.

Hulse, S.E.; Ibrahim, S.A.; Whicker, F.W.; Chapman, P.L. [Colorado State Univ., Fort Collins, CO (United States)

1999-03-01T23:59:59.000Z

148

Technical safety appraisal: Buildings 776/777 Rocky Flats Plant  

SciTech Connect

Buildings 776/777 at the Rocky Flats Plant are major components of the production complex at the plant site. They have been in operation since 1957. The operations taking place in the buildings are nuclear weapons production support, processing of weapons assemblies returned from Pantex, waste processing, research and development in support of production, special projects, and those generated by support groups, such as maintenance. The appraisal team identified nine deficiencies that it believed required prompt attention. DOE management for EH, the program office (Defense Programs), and the field office analyzed the information provided by the appraisal team and instituted compensatory measures for closer monitoring of contractor activities by knowledgeable DOE staff and staff from other sites. Concurrently, the contractor was requested to address both short-term and long-term remedial measures to correct the identified issues as well as the underlying problems. The contractor has provided his action plan, which is included. This plan was under evaluation by EH and the DOE program office at the time this report was prepared. In addressing the major areas of concern identified above, a well as the specific deficiencies identified by the appraisal team, the contractor and the field office are cautioned to search for the root causes for the problems and to direct corrective actions to those root causes rather than solely to the symptoms to assure the sustainability of the improvements being made. The results of prior TSAs led DOE to conclude that previous corrective actions were not sufficient in that a large number of the individual findings are recurrent. Pending completion of remedial actions over the next few months, enhanced DOE oversight of the contractor is warranted.

Field, H C

1988-03-01T23:59:59.000Z

149

The Rocky Flats Plant Waste Stream and Residue Identification and Characterization Program (WSRIC): Progress and achievements  

SciTech Connect

The Waste Stream and Residue Identification and Characterization (WSRIC) Program, as described in the WSRIC Program Description delineates the process knowledge used to identify and characterize currently-generated waste from approximately 5404 waste streams originating from 576 processes in 288 buildings at Rocky Flats Plant (RFP). Annual updates to the WSRIC documents are required by the Federal Facilities Compliance Agreement between the US Department of Energy, the Colorado Department of Health and the Environmental Protection Agency. Accurate determination and characterization of waste is a crucial component in RFP`s waste management strategy to assure compliance with Resource Conservation and Recovery Act (RCRA) storage and treatment requirements, as well as disposal acceptance criteria. The WSRIC Program was rebaselined in September 1992, and serves as the linchpin for documenting process knowledge in RFP`s RCRA operating record. Enhancements to the WSRIC include strengthening the waste characterization rationale, expanding WSRIC training for waste generators, and incorporating analytical information into the WSRIC building books. These enhancements will improve credibility with the regulators and increase waste generators` understanding of the basis for credible waste characterizations.

Ideker, V.L. [EG and G Rocky Flats, Inc., Golden, CO (United States). Rocky Flats Plant; Doyle, G.M. [USDOE Rocky Flats Office, Golden, CO (United States)

1994-02-01T23:59:59.000Z

150

Hanford/Rocky Flats collaboration on development of supercritical carbon dioxide extraction to treat mixed waste  

SciTech Connect

Proposals for demonstration work under the Department of Energy`s Mixed Waste Focus Area, during the 1996 through 1997 fiscal years included two applications of supercritical carbon dioxide to mixed waste pretreatment. These proposals included task RF15MW58 of Rocky Flats and task RL46MW59 of Hanford. Analysis of compatibilities in wastes and work scopes yielded an expectation of substantial collaboration between sites whereby Hanford waste streams may undergo demonstration testing at Rocky Flats, thereby eliminating the need for test facilities at Hanford. This form of collaboration is premised the continued deployment at Rocky Flats and the capability for Hanford samples to be treated at Rocky Flats. The recent creation of a thermal treatment contract for a facility near Hanford may alleviate the need to conduct organic extraction upon Rocky Flats wastes by providing a cost effective thermal treatment alternative, however, some waste streams at Hanford will continue to require organic extraction. Final site waste stream treatment locations are not within the scope of this document.

Hendrickson, D.W.; Biyani, R.K. [Westinghouse Hanford Co., Richland, WA (United States); Brown, C.M.; Teter, W.L. [Kaiser-Hill Co., Golden, CO (United States)

1995-11-01T23:59:59.000Z

151

Analysis of offsite emergency planning zones (EPZs) for the Rocky Flats Plant  

SciTech Connect

This Project Plan Overview summarizes the design of a project to complete analysis of offsite Emergency Planning Zones (EPZs) for the Rocky Flats Plant. Federal, state, and local governments develop emergency plans for facilities that may affect the public in the event of an accidental release of nuclear or hazardous materials. One of the purposes of these plans is to identify EPZs where actions could be necessary to protect public health. Public protective actions include sheltering, evacuation, and relocation. Agencies use EPZs to develop response plans and to determine needed resources. DOE and EG G Rocky Flats, Inc., will develop recommended offsite EPZs for the Rocky Flats Plant (RFP). We will develop recommended sheltering and evacuation EPZs for accidental release of radionuclides to the atmosphere from the facility. We will also develop recommended EPZs for accidental releases of major nonradiological hazardous substances to the atmosphere, and will analyze the impacts of an unplanned surface water release from the facility. DOE and EG G Rocky Flats will submit these recommendations to the CDH for potential use in the State's offsite emergency planning for the Rocky Flats Plant. 3 refs., 3 figs., 4 tabs.

Hodgin, C.R.; Armstrong, C.; Daugherty, N.M.; Foppe, T.L.; Petrocchi, A.J.; Southward, B.

1990-05-16T23:59:59.000Z

152

Post-Closure Land Jurisdiction Transfer to the US Fish and Wildlife Service at Rocky Flats: Surviving the Safari Through Old Records and Other Lessons Learned  

SciTech Connect

The U.S. Department of Energy's (DOE's) Rocky Flats Site (Rocky Flats), located near Denver, Colorado, was listed on the Comprehensive Environmental Response, Compensation, and Liability Act National Priorities List (NPL) in 1989. Subsequent cleanup and closure activities were completed in October 2005 and the final remedy was selected in September 2006. The remedy is 'no further action' for the generally un-impacted Peripheral Operable Unit (OU), formerly known as the Buffer Zone, and institutional and physical controls with continued monitoring for the Central OU, formerly the industrialized area. The Peripheral OU has been deleted from the NPL and jurisdiction over the majority of land in that OU (3,953 acres) was transferred to the U.S. Fish and Wildlife Service (USFWS) on July 12, 2007, to establish the Rocky Flats National Wildlife Refuge. The remaining approximately 929 acres in the Peripheral OU were retained by DOE's Office of Legacy Management where outstanding mineral leases and mining operations exist. As mineral rights are purchased or mining operations and mineral leases are completed and fully reclaimed, jurisdiction of portions of the 929 acres will also be transferred to USFWS for inclusion into the refuge. During the almost 2 years since cleanup and closure work was completed at Rocky Flats, DOE and USFWS have worked the specific legal parameters, timing, and constraints of the 3,953-acre transfer. Many lessons have been learned, based on these early experiences. (authors)

Schiesswohl, S. [U.S. Department of Energy, Office of Legacy Management, Westminster, CO (United States); Hanson, M. [S.M. Stoller Corporation, Westminster, CO (United States)

2008-07-01T23:59:59.000Z

153

Rocky Flats Plant Site Environmental Report for 1992  

SciTech Connect

The Rocky Rats Plant Site Environmental Report provides summary information on the plant`s environmental monitoring programs and the results recorded during 1992. The report contains a compliance summary, results of environmental monitoring and other related programs, a review of environmental remediation activities, information on external gamma radiation dose monitoring, and radiation dose estimates for the surrounding population.

Cirrincione, D.A.; Erdmann, N.L. [eds.

1992-12-31T23:59:59.000Z

154

Comparative risk analysis for the Rocky Flats Plant integrated project planning  

SciTech Connect

The Rocky Flats Plant is developing, with active stakeholder participation, a comprehensive planning strategy that will support transition of the Rocky Flats Plant from a nuclear weapons production facility to site cleanup and final disposition. Final disposition of the Rocky Flats Plant materials and contaminants requires consideration of the interrelated nature of sitewide problems, such as material movement and disposition, facility and land use endstates, costs, relative risks to workers and the public, and waste disposition. Comparative risk analysis employs both incremental risk and cumulative risk evaluations to compare risks from postulated options or end states. These postulated options or end states can be various remedial alternatives, or future endstate uses of federal land.

Jones, M.E.; Shain, D.I.

1994-12-31T23:59:59.000Z

155

Comparative risk analysis for the Rocky Flats Plant integrated project planning  

SciTech Connect

The Rocky Flats Plant is developing, with active stakeholder a comprehensive planning strategy that will support transition of the Rocky Flats Plant from a nuclear weapons production facility to site cleanup and final disposition. Final disposition of the Rocky Flats Plant materials and contaminants requires consideration of the interrelated nature of sitewide problems, such as material movement and disposition, facility and land use endstates, costs relative risks to workers and the public, and waste disposition. Comparative Risk Analysis employs both incremental risk and cumulative risk evaluations to compare risks from postulated options or endstates. These postulated options or endstates can be various remedial alternatives, or future endstate uses of federal agency land. Currently, there does not exist any approved methodology that aggregates various incremental risk estimates. Comparative Risk Analysis has been developed to aggregate various incremental risk estimates to develop a site cumulative risk estimate. This paper discusses development of the Comparative Risk Analysis methodology, stakeholder participation and lessons learned from these challenges.

Jones, M.E.; Shain, D.I.

1994-05-01T23:59:59.000Z

156

Long-term risk stabilization of the Rocky Flats Plant residues  

SciTech Connect

The liquid and solid residues continue to be a concern at Rocky Flats, primarily due to safety aspects of long-term storage and of the need for processing them into a form for ultimate disposal. Currently, Rocky Flats is processing the low-level solutions from bottles and tanks by direct cementation for storage and disposal. Plans for actinide precipitation of the high-level solutions are being finalized with an anticipated completion date of 2 to 3 yr. The solid residues present a more difficult challenge because of the numerous forms that these exist. Rocky Flats is developing several strategies to handle these materials for safe long-term storage and eventual disposal.

Melberg, T.A. [Dept. of Energy, Golden, CO (United States)

1994-12-31T23:59:59.000Z

157

A comparative study of 239,240Pu in soil near the former Rocky Flats Nuclear Weapons Facility, Golden, CO  

Science Journals Connector (OSTI)

The Rocky Flats Nuclear Weapons Plant near Golden, CO released plutonium into the environment during almost 40 years of operation. Continuing concern over possible health impacts of these releases has been heightened by lack of public disclosure of the US Department of Energy (DOE) activities. A dose reconstruction study for the Rocky Flats facilities, begun in 1990, provided a unique opportunity for concerned citizens to design and implement field studies without participation of the DOE, its contractors, or other government agencies. The Citizens Environmental Sampling Committee was formed in late 1992 and conducted a field sampling program in 1994. Over 60 soil samples, including both surface and core samples, were collected from 28 locations where past human activities would have minimal influence on contaminant distributions in soil. Cesium-137 activity was used as a means to assess whether samples were collected in undisturbed locations. The distribution of plutonium (as 239,240Pu) in soil was consistent with past sampling conducted by DOE, the Colorado Department of Public Health and Environment, and others. Elevated levels of 239,240Pu were found immediately east of the Rocky Flats Plant, with concentrations falling rapidly with distance from the plant to levels consistent with background from fallout. Samples collected in areas south, west, and north of the plant were generally consistent with background from fallout. No biases in past sampling due to choice of sampling locations or sampling methodology were evident. The study shows that local citizens, when provided sufficient resources, can design and implement technical studies that directly address community concerns where trust in the regulated community and/or regulators is low.

Todd D. Margulies; Niels D. Schonbeck; Normie C. Morin-Voillequ; Katherine A. James; James M. LaVelle

2004-01-01T23:59:59.000Z

158

Evaluation of an emergency response model for the Rocky Flats Plant: Charter  

SciTech Connect

This Charter provides a basis for a cooperative, interagency effort to evaluate the Terrain-Responsive Atmospheric Code for emergency response and emergency planning for the Rocky Flats Plant. This document establishes the foundation for the project entitled, Evaluation of an Emergency Response Model for the Rocky Flats Plant'' (to be referred to as the Project). This document meets the following objectives: Identify the Project; establish the project management structure, organizational responsibilities, and organizational commitments for reaching the goals of the Project, and identify a process for model revision and revelation for acceptance. 2 figs.

Not Available

1991-01-01T23:59:59.000Z

159

Decontamination and decommissioning of building 889 at Rocky Flats Environmental Technology Site  

SciTech Connect

At the Rocky Flats site, the building 889 decommissioning project was the first large-scale decommissioning project of a radiologically contaminated facility at Rocky Flats. The scope consisted of removal of all equipment and utility systems from the interior of the building, decontamination of interior building surfaces, and the demolition of the facility to ground level. Details of the project management plan, including schedule, engineering, cost, characterization methodologies, decontamination techniques, radiological control requirements, and demolition methods, are provided in this article. 1 fig., 3 tabs.

Dorr, K.A. [Kaiser-Hill Co., Golden, CO (United States); Hickman, M.E.; Henderson, B.J. [Rocky Mountain Remediation Services, Golden, CO (United States); Sexton, R.J. [Scientific Ecology Group, Golden, CO (United States)

1997-09-01T23:59:59.000Z

160

Clarification of Institutional Controls at the Rocky Flats Site Central Operable Unit and Implementation of the Soil Disturbance Review Plan - 13053  

SciTech Connect

Cleanup and closure of DOE's Rocky Flats Site in Colorado, which was placed on the CERCLA National Priority List in 1989, was accomplished under CERCLA, RCRA, and the Colorado Hazardous Waste Act (CHWA). The physical cleanup work was completed in late 2005 and all buildings and other structures that composed the Rocky Flats industrial complex were removed from the surface, but remnants remain in the subsurface. Other remaining features include two landfills closed in place with covers, four groundwater treatment systems, and surface water and groundwater monitoring systems. Under the 2006 Corrective Action Decision/Record of Decision for Rocky Flats Plant (US DOE) Peripheral Operable Unit and the Central Operable Unit (CAD/ROD), the response actions selected for the Central Operable Unit (OU) are institutional controls (ICs), physical controls, and continued monitoring and maintenance. The objectives of these ICs were to prevent unacceptable exposure to remaining subsurface contamination and to prevent contaminants from mobilizing to surface water and to prevent interfering with the proper functioning of the engineered components of the remedy. An amendment in 2011 of the 2006 CAD/ROD clarified the ICs to prevent misinterpretation that would prohibit work to manage and maintain the Central OU property. The 2011 amendment incorporated a protocol for a Soil Disturbance Review Plan for work subject to ICs that requires approval from the State and public notification by DOE prior to conducting approved soil-disturbing work. (authors)

DiSalvo, Rick [Stoller LMS Team, 11025 Dover St, Suite 1000, Westminster, CO 80021 (United States)] [Stoller LMS Team, 11025 Dover St, Suite 1000, Westminster, CO 80021 (United States); Surovchak, Scott [U.S. Department of Energy, Office of Legacy Management, 11025 Dover St, Suite 1000, Westminster, CO 80021 (United States)] [U.S. Department of Energy, Office of Legacy Management, 11025 Dover St, Suite 1000, Westminster, CO 80021 (United States); Spreng, Carl [Colorado Department of Public Health and Environment, 4300 Cherry Creek Dr. S, Denver, CO 80246-1530 (United States)] [Colorado Department of Public Health and Environment, 4300 Cherry Creek Dr. S, Denver, CO 80246-1530 (United States); Moritz, Vera [U.S. Environmental Protection Agency, Region 8, 1595 Wynkoop St., Denver, CO 80202-1129 (United States)] [U.S. Environmental Protection Agency, Region 8, 1595 Wynkoop St., Denver, CO 80202-1129 (United States)

2013-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "rocky flats colorado" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Evolution of a Groundwater Treatment System-Rocky Flats, Colorado...  

Energy Savers (EERE)

the treatment cells (which are made of plastic, so they're more fragile than concrete tanks) and hauled away for disposal. Due to the past nuclear weapons-related mission of...

162

Rocky Flats, Colorado, Site Quarterly Report of Site Surveillance...  

Office of Legacy Management (LM)

the former treatment cells while they were converted to the influent and effluent batch tanks as part of the reconfigured ETPTS. This bypass configuration will be the normal...

163

CONSTRUCTION HISTORY OF THE ROCKY MOUNT HISTORIC SITE (40SL386), PINEY FLATS, TENNESSEE FROM TREE-RING AND  

E-Print Network (OSTI)

CONSTRUCTION HISTORY OF THE ROCKY MOUNT HISTORIC SITE (40SL386), PINEY FLATS, TENNESSEE FROM TREE-RING AND DOCUMENTARY EVIDENCE Henri D. Grissino-Mayer, Lisa B. LaForest, and Saskia L. van de Gevel The Rocky Mount Historic Site (40SL386) in Piney Flats, Tennessee, houses structures that many believe date to the founding

Grissino-Mayer, Henri D.

164

Implementation of Revision 19 of the TRUPACT-II Safety Analysis Report at Rocky Flats Environmental Technology Site  

SciTech Connect

The U.S. Nuclear Regulatory Commission on July 27, 2001 approved Revision 19 of the TRUPACT-II Safety Analysis Report (SAR) and the associated TRUPACT-II Authorized Methods for Payload Control (TRAMPAC). Key initiatives in Revision 19 included matrix depletion, unlimited mixing of shipping categories, a flammability assessment methodology, and an alternative methodology for the determination of flammable gas generation rates. All U.S. Department of Energy (DOE) sites shipping transuranic (TRU) waste to the Waste Isolation Pilot Plant (WIPP) were required to implement Revision 19 methodology into their characterization and waste transportation programs by May 20, 2002. An implementation process was demonstrated by the Rocky Flats Environmental Technology Site (RFETS) in Golden, Colorado. The three-part process used by RFETS included revision of the site-specific TRAMPAC, an evaluation of the contact-handled TRU waste inventory against the regulations in Revision 19, and design and development of software to facilitate future inventory analyses.

D'Amico, E.; O'Leary, J.; Bell, S.; Djordjevic, S.; Givens, C,; Shokes, T.; Thompson, S.; Stahl, S.

2003-02-25T23:59:59.000Z

165

DOE's Former Rocky Flats Weapons Production Site to Become National...  

Energy Savers (EERE)

Flats nuclear weapons production site to the Department of the Interior's (DOI) U.S. Fish and Wildlife Service (FWS) for use as a National Wildlife Refuge. After more than a...

166

Long-Term Surveillance and Maintenance at Rocky Flats: Early Experiences and Lessons Learned  

SciTech Connect

The U.S. Department of Energy's (DOE's) Rocky Flats Site was established in 1951 as part of the United States' nationwide nuclear weapons complex to manufacture nuclear weapons components. In 1992 weapons production halted, and the Rocky Flats mission changed to include environmental investigations, cleanup, and site closure. In October 2005, DOE and its contractor completed an accelerated 10-year, $7 billion cleanup of chemical and radiological contamination left from nearly 50 years of production. The cleanup required the decommissioning, decontamination, demolition, and removal of more than 800 structures; removal of more than 500,000 cubic meters of low-level radioactive waste; and remediation of more than 360 potentially contaminated environmental sites. The final remedy for the site was selected in September 2006 and included institutional controls, physical controls, and continued monitoring for the former industrial portion of the site. The remainder of the site, which served as a buffer zone surrounding the former industrial area, was transferred to the U.S. Fish and Wildlife Service in July 2007 for a national wildlife refuge. DOE's Office of Legacy Management is responsible for the long-term surveillance and maintenance of Rocky Flats, which includes remedy implementation activities and general site maintenance. Several factors have complicated the transition from closure to post-closure at Rocky Flats. The early experiences associated with the two years since the physical cleanup and closure work were completed have led to several valuable lessons learned. (authors)

Surovchak, S. [U.S. Department of Energy, Office of Legacy Management, Westminster, CO (United States); Kaiser, L.; DiSalvo, R.; Boylan, J.; Squibb, G.; Nelson, J.; Darr, B.; Hanson, M. [S.M. Stoller Corporation, Westminster, CO (United States)

2008-07-01T23:59:59.000Z

167

Vitrification of plutonium at Rocky Flats the argument for a pilot plant  

SciTech Connect

Current plans for stabilizing and storing the plutonium at Rocky Flats Plant fail to put the material in a form suitable for disposition and resistant to proliferation. Vitrification should be considered as an alternate technology. The vitrification should begin with a small-scale pilot plant.

Moore, L. [Rocky Mountain Peace Center, Boulder, CO (United States)

1996-05-01T23:59:59.000Z

168

Radiological/Health physics program assessement at Rocky Flats, the process  

SciTech Connect

The Department of Energy, Rocky Flats Office, Safety and Health Group, Health Physics Team (HPT) is responsible for oversight of the Radiation Protection and Health Physics Program (RPHP) of the Integrating Management Contractor (IMC), Kaiser-Hill (K-H) operations at the Rocky Flats Environmental Technology Site (RFETS). As of 1 January 1996 the Rocky Flats Plant employed 300 DOE and 4,300 contractor personnel (K-H and their subcontractors). WSI is a subcontractor and provides plant security. To accomplish the RPHP program oversight HPT personnel developed a systematic methodology for performing a functional RPHP Assessment. The initial process included development of a flow diagram identifying all programmatic elements and assessment criteria documents. Formulation of plans for conducting interviews and performance of assessments constituted the second major effort. The generation of assessment reports was the final step, based on the results of this process. This assessment will be a 6 person-year effort, over the next three years. This process is the most comprehensive assessment of any Radiation Protection and Health Physics (RPHP) Program ever performed at Rocky Flats. The results of these efforts will establish a baseline for future RPHP Program assessments at RFETS. This methodology has been well-received by contractor personnel and creates no Privacy Act violations or other misunderstandings.

Psomas, P.O. [Department of Energy, Golden, CO (United States)

1996-06-01T23:59:59.000Z

169

Tools for Closure Project and Contract Management: Development of the Rocky Flats Integrated Closure Project Baseline  

SciTech Connect

This paper details the development of the Rocky Flats Integrated Closure Project Baseline - an innovative project management effort undertaken to ensure proactive management of the Rocky Flats Closure Contract in support of the Department's goal for achieving the safe closure of the Rocky Flats Environmental Technology Site (RFETS) in December 2006. The accelerated closure of RFETS is one of the most prominent projects within the Department of Energy (DOE) Environmental Management program. As the first major former weapons plant to be remediated and closed, it is a first-of-kind effort requiring the resolution of multiple complex technical and institutional challenges. Most significantly, the closure of RFETS is dependent upon the shipment of all special nuclear material and wastes to other DOE sites. The Department is actively working to strengthen project management across programs, and there is increasing external interest in this progress. The development of the Rocky Flats Integrated Closure Project Baseline represents a groundbreaking and cooperative effort to formalize the management of such a complex project across multiple sites and organizations. It is original in both scope and process, however it provides a useful precedent for the other ongoing project management efforts within the Environmental Management program.

Gelles, C. M.; Sheppard, F. R.

2002-02-26T23:59:59.000Z

170

Rocky Flats Environmental Technology Site Mixed Residue Consent Order, September 24, 1999 Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9-09-24-01 9-09-24-01 State Colorado Agreement Type Consent Order Legal Driver(s) RCRA Scope Summary Substitute this Consent Order for the MR Consent Order; establish requirements for mixed residues management. Parties DOE ; Kaiser-Hill Company, LLC; Safe Sites of Colorado, LLC; Rocky Mountain Remediation Services, LLC; Colorado Department of Public Health and Environment Date 9/24/1999 SCOPE * Substitute this Consent Order for the MR Consent Order by modifying in its entirety the Settlement Agreement and Compliance Order on Consent, number 93-04-23-01, (the "MR Consent Order"). * Establish requirements for certain activities involving mixed residues management. * Establish enforceable commitment dates. ESTABLISHING MILESTONES * Provisions regarding enforceable commitment dates and the procedures to add

171

Understanding Contaminant Transport Pathways at Rocky Flats - A Basis for the Remediation Strategy  

SciTech Connect

The Rocky Flats Environmental Technology Site (RFETS) is a Department of Energy facility located approximately 16 miles northwest of Denver, Colorado. Processing and fabrication of nuclear weapons components occurred at Rocky Flats from 1952 through 1989. Operations at the Site included the use of several radionuclides, including plutonium-239/240 (Pu), americium-241 (Am), and various uranium (U) isotopes, as well as several types of chlorinated solvents. The historic operations resulted in legacy contamination, including contaminated facilities, process waste lines, buried wastes and surface soil contamination. Decontamination and removal of buildings at the site was completed in late 2005, culminating more than ten years of active environmental remediation work. The Corrective Action Decision/Record of Decision was subsequently approved in 2006, signifying regulatory approval and closure of the site. The use of RFETS as a National Wildlife Refuge is scheduled to be in full operation by 2012. To develop a plan for remediating different types of radionuclide contaminants present in the RFETS environment required understanding the different environmental transport pathways for the various actinides. Developing this understanding was the primary objective of the Actinide Migration Evaluation (AME) project. Findings from the AME studies were used in the development of RFETS remediation strategies. The AME project focused on issues of actinide behavior and mobility in surface water, groundwater, air, soil and biota at RFETS. For the purposes of the AME studies, actinide elements addressed included Pu, Am, and U. The AME program, funded by DOE, brought together personnel with a broad range of relevant expertise in technical investigations. The AME advisory panel identified research investigations and approaches that could be used to solve issues related to actinide migration at the Site. An initial step of the AME was to develop a conceptual model to provide a qualitative description of the relationships among potential actinide sources and transport pathways at RFETS. One conceptual model was developed specifically for plutonium and americium, because of their similar geochemical and transport properties. A separate model was developed for uranium because of its different properties and mobility in the environment. These conceptual models were guidelines for quantitative analyses described in the RFETS Pathway Analysis Report, which used existing data from the literature as well as site-specific analyses, including field, laboratory and modeling studies to provide quantitative estimates of actinide migration in the RFETS environment. For pathways where more than one method was used to estimate offsite loads for a specific pathway, the method yielding the highest estimated off-site was used for comparison purposes. For all actinides studied, for pre-remediation conditions, air and surface water were identified to be the dominant transport mechanisms. The estimated annual airborne plutonium-239/240 load transported off site exceeded the surface water load by roughly a factor of 40. However, despite being the largest transport pathway, airborne radionuclide concentrations at the monitoring location with the highest measurements during the period studied were less than two percent of the allowable 10 milli-rem standard governing DOE facilities. Estimated actinide loads for other pathways were much less. Shallow groundwater was approximately two orders of magnitude lower, or 1/100 of the load conveyed in surface water. The estimated biological pathway load for plutonium was approximately five orders of magnitude less, or 1/100,000, of the load estimated for surface-water. The pathway analysis results were taken into consideration during subsequent remediation activities that occurred at the site. For example, when the 903 Pad area was remediated to address elevated concentrations of Pu and Am in the surface soil, portable tent structures were constructed to prevent wind and water erosion from occurring while remediation activitie

Paton, Ian [Wright Water Engineers, Inc.: 2490 W. 26th Avenue, Suite 100A, Denver, CO 80211 (United States)

2008-01-15T23:59:59.000Z

172

Review of Beryllium Management Practices at Rocky Flats During Closure Operations  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE-Environmental Management DOE - Complex Wide Review of Beryllium Management Practices at Rocky Flats During Closure Operations Challenge Beryllium (Be) metal is used by DOE in weapons production, as a reactor moderator or reflector, and as a fuel element cladding. Workers who are exposed to high concentrations of beryllium often develop acute beryllium disease caused by the inhalation of beryllium dust or particles which can cause Be sensitivity or chronic Be disease (CBD), a disabling and often fatal lung disease. A review of Rocky Flats Environmental Technology Site (RFETS) Be practices put in place by Kaiser-Hill, the cleanup contractor, was initiated to determine the effectiveness of RFETS beryllium characterization and prevention programs and to determine what, if any, suggestions could be

173

Project plan: Procedure system design for the Rocky Flats Plant Emergency Preparedness Program  

SciTech Connect

This procedure system is being designed for the Rocky Flats Plant Emergency Preparedness Program (EPP) to: assess the procedural needs of the Emergency Preparedness Program in light of the existing Rocky Flats Plant policies, plans, procedures, and applicable DOE orders; design the structure of the Emergency Preparedness Program procedural system based on the classes of procedures needed, the types of procedures (procedures vs job outline), the sections of procedures required, and the timetable for procedure maintenance; develop boiler plate formats for the various authors in writing the necessary standardized procedures; develop a list of all the necessary procedures that must be produced for Emergency Preparedness Program; and provide consistency for department-wide activities relating to the quality control in writing, distribution, and revising procedures for Emergency Preparedness Program. 23 refs., 18 figs.

Hodgin, C.R.; Brown-Strattan, M.

1989-10-01T23:59:59.000Z

174

Rocky Flats Environmental Technology Site Ecological Monitoring Program 1995 annual report  

SciTech Connect

The Ecological Monitoring Program (ECMP) was established at the Rocky Flats Environmental Technology Site (Site) in September 1992. At that time, EcMP staff developed a Program Plan that was peer-reviewed by scientists from western universities before submittal to DOE RFFO in January 1993. The intent of the program is to measure several quantitative variables at different ecological scales in order to characterize the Rocky Flats ecosystem. This information is necessary to document ecological conditions at the Site in impacted and nonimpacted areas to determine if Site practices have had ecological impacts, either positive or negative. This information can be used by managers interested in future use scenarios and CERCLA activities. Others interested in impact analysis may also find the information useful. In addition, these measurements are entered into a database which will serve as a long-term information repository that will document long-term trends and potential future changes to the Site, both natural and anthropogenic.

NONE

1995-05-31T23:59:59.000Z

175

The marriage of RCRA and CERCLA at the Rocky Flats Environmental Technology Site  

SciTech Connect

A key goal of the Rocky Flats Cleanup Agreement (RFCA) signed in July of 1996 was to provide a seamless marriage of the Resource Conservation and Recovery Act (RCRA) (and other media specific programs) and the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) and the implementing agencies of each. This paper examines the two years since the signing of RFCA and identifies the successes, failures, and stresses of the marriage. RFCA has provided an excellent vehicle for regulatory and substantive progress at the Department of Energy`s Rocky Flats facility. The key for a fully successful marriage is to build on the accomplishments to date and to continually improve the internal and external systems and relationships. To date, the parties can be proud of both the substantial accomplishment of substantive environmental work and the regulatory systems that have enabled the work.

Shelton, D.C.; Brooks, L.M.

1998-11-01T23:59:59.000Z

176

Historical Exposures to Chemicals at the Rocky Flats Nuclear Weapons Plant: A Pilot Retrospective Exposure Assessment  

SciTech Connect

In a mortality study of white males who had worked at the Rocky Flats Nuclear Weapons Plant between 1952 and 1979, an increased number of deaths from benign and unspecified intracranial neoplasms was found. A case-control study nested within this cohort investigated the hypothesis that an association existed between brain tumor death and exposure to either internally deposited plutonium or external ionizing radiation. There was no statistically significant association found between estimated radiation exposure from internally deposited plutonium and the development of brain tumors. Exposure by job or work area showed no significant difference between the cohort and the control groups. An update of the study found elevated risk estimates for (1) all lymphopoietic neoplasms, and (2) all causes of death in employees with body burdens greater than or equal to two nanocuries of plutonium. There was an excess of brain tumors for the entire cohort. Similar cohort studies conducted on worker populations from other plutonium handling facilities have not yet shown any elevated risks for brain tumors. Historically, the Rocky Flats Nuclear Weapons Plant used large quantities of chemicals in their production operations. The use of solvents, particularly carbon tetrachloride, was unique to Rocky Flats. No investigation of the possible confounding effects of chemical exposures was done in the initial studies. The objectives of the present study are to (1) investigate the history of chemical use at the Rocky Flats facility; (2) locate and analyze chemical monitoring information in order to assess employee exposure to the chemicals that were used in the highest volume; and (3) determine the feasibility of establishing a chemical exposure assessment model that could be used in future epidemiology studies.

Janeen Denise Robertson

1999-02-01T23:59:59.000Z

177

Criticality safety evaluation of Rocky Flats Plant one-gallon shipping containers  

SciTech Connect

Criticality safety calculations have been performed to provide an analytical basis for handling, storage and transport of Rocky Flats Plant (RFP) one-gallon shipping containers. A mass limit was establish for metal (solid uranium or plutonium) and slurries (undissolved U or Pu solids in a ``mud,`` ``sludge,`` or ``slurry``). A separate volume limit was developed for plutonium solutions (liquids, either aqueous or organic, containing no visible undissolved solids).

Shaw, M.E.

1991-12-01T23:59:59.000Z

178

Criticality safety evaluation of Rocky Flats Plant one-gallon shipping containers  

SciTech Connect

Criticality safety calculations have been performed to provide an analytical basis for handling, storage and transport of Rocky Flats Plant (RFP) one-gallon shipping containers. A mass limit was establish for metal (solid uranium or plutonium) and slurries (undissolved U or Pu solids in a mud,'' sludge,'' or slurry''). A separate volume limit was developed for plutonium solutions (liquids, either aqueous or organic, containing no visible undissolved solids).

Shaw, M.E.

1991-12-01T23:59:59.000Z

179

X-Ray Absorption Spectroscopy of Plutonium Particles at the Rocky Flats US Nuclear Weapons Production Site  

Science Journals Connector (OSTI)

The Rocky Flats Environmental Technology Site (RFETS) was a...2. This information coupled with ultrafiltration studies was used to make the case for particle transport mechanisms as the basis of plutonium and ame...

Steven D. Conradson; David L. Clark; Christophe den Auwer

2011-01-01T23:59:59.000Z

180

Results of Soil Vapor Extraction of a Chlorinated Solvent Dnapl Waste Site at the Rocky Flats Superfund Site  

Science Journals Connector (OSTI)

A full scale Soil Vapor Extraction (SVE) system was evaluated for remediation of subsurface contamination of the chlorinated Dense Non-Aqueous Phase Liquids (DNAPL) at a waste site at the Rocky Flats Environmenta...

S. Grace; E. Dille

1995-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "rocky flats colorado" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Analysis of offsite Emergency Planning Zones (EPZs) for the Rocky Flats Plant. Phase 3, Sitewide spectrum-of-accidents and bounding EPZ analysis  

SciTech Connect

During Phase 3 of the EPZ project, a sitewide analysis will be performed applying a spectrum-of-accidents approach to both radiological and nonradiological hazardous materials release scenarios. This analysis will include the MCA but will be wider in scope and will produce options for the State of Colorado for establishing a bounding EPZ that is intended to more comprehensively update the interim, preliminary EPZ developed in Phase 2. EG&G will propose use of a hazards assessment methodology that is consistent with the DOE Emergency Management Guide for Hazards Assessments and other methods required by DOE orders. This will include hazards, accident, safety, and risk analyses. Using this methodology, EG&G will develop technical analyses for a spectrum of accidents. The analyses will show the potential effects from the spectrum of accidents on the offsite population together with identification of offsite vulnerable zones and areas of concern. These analyses will incorporate state-of-the-art technology for accident analysis, atmospheric plume dispersion modeling, consequence analysis, and the application of these evaluations to the general public population at risk. The analyses will treat both radiological and nonradiological hazardous materials and mixtures of both released accidentally to the atmosphere. DOE/RFO will submit these results to the State of Colorado for the State`s use in determining offsite emergency planning zones for the Rocky Flats Plant. In addition, the results will be used for internal Rocky Flats Plant emergency planning.

Petrocchi, A.J.; Zimmerman, G.A.

1994-03-14T23:59:59.000Z

182

USING HYPERSPECTRAL IMAGERY TO ASSIST FEDERAL FOREST MONITORING AND RESTORATION PROJECTS IN THE SOUTHERN ROCKY MOUNTAINS, COLORADO  

E-Print Network (OSTI)

catastrophic wildfires. Many of the restoration techniques that were proposed do not differ greatly from what is currently being applied by various governmental agencies in Colorado. The most relevant research publications related to forest monitoring... USING HYPERSPECTRAL IMAGERY TO ASSIST FEDERAL FOREST MONITORING AND RESTORATION PROJECTS IN THE SOUTHERN ROCKY MOUNTAINS, COLORADO BY Kyle Wamser Submitted to the graduate degree program in Department of Geography and the Faculty...

Wamser, William Kyle

2012-12-31T23:59:59.000Z

183

HYDROGEN DATA FROM LOS ALAMOS [LANL] & SAVANNAH RIVER [SRC] & ROCKY FLATS [RFE] [SEC 1 & 2  

SciTech Connect

A DOE letter dated August 14, 2001 requested that a detailed analysis of the expected probability of accumulation of significant quantities of hydrogen gas in unvented drums and a plan and schedule for venting drums be prepared and submitted. In response to the letter a document was prepared that included data of hydrogen concentrations in TRU waste drums. Data was collected from Savannah River Site, Los Alamos National Laboratory, and Rocky Flats Environmental Technology Site. These data were analyzed to provide the basis for evaluating the probability that significant quantities of hydrogen will accumulate in the unvented TRU drums stored at Hanford.

DAYLEY, L.

2001-11-19T23:59:59.000Z

184

Implementation of IAEA safeguards at the Rocky Flats Environmental Technology Site  

SciTech Connect

When President Clinton spoke to the United Nations General Assembly in September 1993, he offered to place US excess defense nuclear material under International Atomic Energy Agency (IAEA) safeguards, before the next Nuclear Nonproliferation Treaty (NPT) Extension Conference. This set in motion a flurry of activities at three DOE facilities, including Rocky Flats Environmental Technology Site (Site). With general guidance from DOE Headquarters, the facility selected a suitable storage area, identified appropriate materials, and acquired the necessary instrumentation to implement full-scale IAEA safeguards on excess plutonium oxide.

Giacomini, J.J.; Finleon, C.A.; Larsen, R.K. [EG and G Rocky Flats, Inc., Golden, CO (United States). Rocky Flats Plant; Lucas, M.; Langner, D. [Los Alamos National Lab., NM (United States)

1995-07-01T23:59:59.000Z

185

Rebaselining seismic risks for resumption of Building 707 plutonium operations at the Rocky Flats Plant  

SciTech Connect

Natural phenomena risks have been assessed for plutonium handling facilities at the Rocky Flats Plant, based on numerous studies performed for the Department of Energy Natural Phenomena Hazards Project. The risk assessment was originally utilized in the facilities Final Safety Analysis Reports and in subsequent risk management decisions. Plutonium production operations were curtailed in 1989 in order for a new operating contractor to implement safety improvements. Since natural phenomena events dominated risks to the public, a re-assessment of these events were undertaken for resumption of plutonium operations.

Elia, F. Jr. [Stone and Webster Engineering Corp., Boston, MA (United States); Foppe, T.; Stahlnecker, E. [EG and G Rocky Flats, Inc., Golden, CO (United States)

1993-08-01T23:59:59.000Z

186

Rocky Flats Closure: the Role of Models in Facilitating Scientific Communication With Stakeholder Groups  

SciTech Connect

The Rocky Flats Environmental Technology Site (RFETS) was a U.S. Department of Energy (DOE) environmental cleanup site for a previous manufacturing plant that made components for the U.S. nuclear weapons arsenal. The facility was shut down in 1989 to address environmental and safety concerns, and left behind a legacy of contaminated facilities, soils, surface and ground water. In 1995, the Site contractor established the Actinide Migration Evaluation (AME) advisory group to provide advice and technical expertise on issues of actinide behavior and mobility in the air, surface water, groundwater, and soil. Through a combination of expert judgment supported by state-of-the-art scientific measurements, it was shown that under environmental conditions at Rocky Flats, plutonium and americium form insoluble oxides that adhere to small soil, organic, and mineral particles and colloids, or are colloidal materials themselves. A series of models ranging from conceptual, geostatistical, and large-scale wind and surface water erosion models were used to guide stakeholder interactions. The nature of these models, and their use in public communication is described.

Clark, D.L.; Choppin, G.R.; Dayton, C.S.; Janecky, D.R.; Lane, L.J.; Paton, I.

2009-05-28T23:59:59.000Z

187

Reactive barrier technologies for treatment of contaminated groundwater at Rocky Flats  

SciTech Connect

The U.S. Department of Energy (DOE) Office of Science and Technology Subsurface Contaminants Focus Area is supporting the investigation of reactive barrier technologies to mitigate the risks associated with mixed organic/radioactive waste at several DOE sites. Groundwater from a small contaminated plume at the Rocky Flats Environmental Technology Site (RFETS) is being used to evaluate passive reactive material treatment. Permeable reactive barriers which intercept contaminants and destroy the VOC component while containing radionuclides are attractive for a number of reasons relating to public and regulatory acceptance. In situ treatment keeps contaminants away from the earth`s surface, there is no above-ground treatment equipment that could expose workers and the public and operational costs are expected to be lower than currently used technologies. This paper will present results from preliminary site characterization and in-field small-scale column testing of reactive materials at RFETS. Successful demonstration is expected to lead to full-scale implementation of the technology at several DOE sites, including Rocky Flats.

Marozas, D.C.; Bujewski, G.E. [Sandia National Labs., Albuquerque, NM (United States); Castaneda, N. [Rocky Flats Field Office, Golden, CO (United States)

1997-12-31T23:59:59.000Z

188

Safety analyses performed in the Systematic Evaluation Program at Rocky Flats  

SciTech Connect

Structures, systems, and components (SSC) at Rocky Flats were designed and put into operation before current standards and criteria applicable to these SSCs were developed. The purpose of the Systematic Evaluation Program (SEP) at Rocky Flats (RF) is to systematically compare the design of SSCs to current design requirements and assess the differences to assure that a balanced and integrated level of safety is achieved to support long-term operation of the facilities. The SEP is being performed in three phases. Phase 1, selection of technical subjects (topics) and development of evaluation plans is complete. Phase 2, comparison of the design of structures, systems and components to current design requirements (CDR), is in progress. It is being performed in two parts, Phase 2A and Phase 2B. An Integrated Assessment of the recommendations from Phase 2 will be performed in Phase 3. The RF SEP is not necessarily used to bring the RF facilities into compliance with newer standards, but to ensure that the safety issues addressed by current requirements either do not exist, are acceptably addressed by existing designs, or are addressed by backfit of existing standards into older facilities to the extent appropriate to the concern. For example, administrative controls may provide adequate resolution of issues addressed by design features in more modern facilities.

Badwan, F.M. [EG and G Rocky Flats, Inc., Golden, CO (United States). Rocky Flats Plant; Persinko, D. [Management Strategies, Inc. (United States); Haga, P.B. [Science Applications International Corporation (United States)

1994-06-01T23:59:59.000Z

189

Stabilization of Rocky Flats combustible residues contaminated with plutonium metal and organic solvents  

SciTech Connect

This report describes tests on a proposed flowsheet designed to stabilize combustible residues that were generated at the Rocky Flats Environmental Technology Site (RFETS) during the machining of plutonium metal. Combustible residues are essentially laboratory trash contaminated with halogenated organic solvents and plutonium metal. The proposed flowsheet, designed by RFETS, follows a glovebox procedure that includes (1) the sorting and shredding of materials, (2) a low temperature thermal desorption of solvents from the combustible materials, (3) an oxidation of plutonium metal with steam, and (4) packaging of the stabilized residues. The role of Los Alamos National Laboratory (LANL) in this study was to determine parameters for the low temperature thermal desorption and steam oxidation steps. Thermal desorption of carbon tetrachloride (CCl{sub 4}) was examined using a heated air stream on a Rocky Flats combustible residue surrogate contaminated with CCl{sub 4}. Three types of plutonium metal were oxidized with steam in a LANL glovebox to determine the effectiveness of this procedure for residue stabilization. The results from these LANL experiments are used to recommend parameters for the proposed RFETS stabilization flowsheet.

Bowen, S.M.; Cisneros, M.R.; Jacobson, L.L.; Schroeder, N.C.; Ames, R.L.

1998-09-30T23:59:59.000Z

190

Rocky Flats closure: The role of models in facilitating scientific communication with stakeholder groups  

Science Journals Connector (OSTI)

The Rocky Flats Environmental Technology Site (RFETS) was a U.S. Department of Energy (DOE) environmental cleanup site for a previous manufacturing plant that made components for the U.S. nuclear weapons arsenal. The facility was shut down in 1989 to address environmental and safety concerns, and left behind a legacy of contaminated facilities, soils, surface and ground water. In 1995, the Site contractor established the Actinide Migration Evaluation (AME) advisory group to provide advice and technical expertise on issues of actinide behavior and mobility in the air, surface water, groundwater, and soil. Through a combination of expert judgment supported by state-of-the-art scientific measurements, it was shown that under environmental conditions at Rocky Flats, plutonium and americium form insoluble oxides that adhere to small soil, organic, and mineral particles and colloids, or are colloidal materials themselves. A series of models ranging from conceptual, geostatistial, and large-scale wind and surface water erosion models were used to guide stakeholder interactions. The nature of these models, and their use in public communication is described.

David L. Clark; Gregory R. Choppin; Christine S. Dayton; David R. Janecky; Leonard J. Lane; Ian Paton

2007-01-01T23:59:59.000Z

191

Cement waste-form development for ion-exchange resins at the Rocky Flats Plant  

SciTech Connect

This report describes the development of a cement waste form to stabilize ion-exchange resins at Rocky Flats Environmental Technology Site (RFETS). These resins have an elevated potential for ignition due to inadequate wetness and contact with nitrates. The work focused on the preparation and performance evaluation of several Portland cement/resin formulations. The performance standards were chosen to address Waste Isolation Pilot Plant and Environmental Protection Agency Resource Conservation and Recovery Act requirements, compatibility with Rocky Flats equipment, and throughput efficiency. The work was performed with surrogate gel-type Dowex cation- and anion-exchange resins chosen to be representative of the resin inventory at RFETS. Work was initiated with nonactinide resins to establish formulation ranges that would meet performance standards. Results were then verified and refined with actinide-containing resins. The final recommended formulation that passed all performance standards was determined to be a cement/water/resin (C/W/R) wt % ratio of 63/27/10 at a pH of 9 to 12. The recommendations include the acceptable compositional ranges for each component of the C/W/R ratio. Also included in this report are a recommended procedure, an equipment list, and observations/suggestions for implementation at RFETS. In addition, information is included that explains why denitration of the resin is unnecessary for stabilizing its ignitability potential.

Veazey, G.W. [Los Alamos National Labs., NM (United States); Ames, R.L. [Rocky Flats Environmental Technology Site, Golden, CO (United States)

1997-03-01T23:59:59.000Z

192

Evaluation of safety assessment methodologies in Rocky Flats Risk Assessment Guide (1985) and Building 707 Final Safety Analysis Report (1987)  

SciTech Connect

FSARs. Rockwell International, as operating contractor at the Rocky Flats plant, conducted a safety analysis program during the 1980s. That effort resulted in Final Safety Analysis Reports (FSARs) for several buildings, one of them being the Building 707 Final Safety Analysis Report, June 87 (707FSAR) and a Plant Safety Analysis Report. Rocky Flats Risk Assessment Guide, March 1985 (RFRAG85) documents the methodologies that were used for those FSARs. Resources available for preparation of those Rocky Flats FSARs were very limited. After addressing the more pressing safety issues, some of which are described below, the present contractor (EG&G) intends to conduct a program of upgrading the FSARs. This report presents the results of a review of the methodologies described in RFRAG85 and 707FSAR and contains suggestions that might be incorporated into the methodology for the FSAR upgrade effort.

Walsh, B.; Fisher, C.; Zigler, G.; Clark, R.A. [Science and Engineering Associates, Inc., Albuquerque, NM (United States)

1990-11-09T23:59:59.000Z

193

History of Uranium-233(sup233U)Processing at the Rocky Flats Plant. In support of the RFETS Acceptable Knowledge Program  

SciTech Connect

This report documents the processing of Uranium-233 at the Rocky Flats Plant (Rocky Flats Environmental Technology Site). The information may be used to meet Waste Isolation Pilot Plant (WIPP) Waste Acceptance Criteria (WAC)and for determining potential Uranium-233 content in applicable residue waste streams.

Moment, R.L.; Gibbs, F.E.; Freiboth, C.J.

1999-04-01T23:59:59.000Z

194

Microwave vitrification of Rocky Flats hydroxide precipitation sludge, Building 774. Progress report  

SciTech Connect

This report describes the first set of experiments performed on transuranic (TRU) precipitation sludge produced in Building 774, to determine the operating parameters for the microwave vitrification process. Toxicity Characteristic Leach Procedure (TCLP) results of the raw sludge showed concentrations of lead, silver and cadmium which were in excess of land disposal restrictions (LDR). Crushed, borosilicate glass was used as a frit source to produce a highly desirable, vitrified, product that required less energy to produce. TCLP testing, of microwaved samples, showed favorable results for 40 and 50% waste loading. The results of this study are encouraging and support the development of microwave vitrification technology for the treatment of various mixed waste streams at Rocky Flats Environmental Technology Site. However, additional experiments are required to fully define the operating parameters for a production-scale system.

Eschen, V.G.; Sprenger, G.S. [eds.; Fenner, G.S.; Corbin, I.E.

1995-04-01T23:59:59.000Z

195

Time pattern of off-site plutonium deposition from rocky flats plant by lake sediment analyses  

Science Journals Connector (OSTI)

A sediment core from a lake downwind of the Rocky Flats Plant, where nuclear weapons components are produced, was used to reconstruct a time pattern of off-site plutonium deposition. Core sections were dated by analyses of 137Cs, 239,240Pu, 238Pu, and 241Am fallout from nuclear testing and 238Pu fallout from a satellite failure. A peak in transuranic concentrations occurred in late 1969 which was attributable to the Plant. This was confirmed by mass isotopic analysis of plutonium isotopes in selected core segments where the global fallout and Plant contributions could be differentiated. The 18 nCi 239,240Pu per m2 from the Plant that had accumulated in the sediment is reasonable when compared to soil analyses.

Edward P. Hardy; Herbert L. Volchok; Hugh D. Livingston; John C. Burke

1980-01-01T23:59:59.000Z

196

Retrospective beryllium exposure assessment at the Rocky Flats Environmental Technology site  

SciTech Connect

Since the 1960`s, beryllium machining was performed to make nuclear weapon components at the Department of Energy (DOE) Rocky Flats Plant. Beryllium exposure was assessed via fixed airhead (FAH) sampling in which the filter cassette was affixed to the machine, generally within a few feet of the worker`s breathing zone. Approximately 500,000 FAH samples were collected for beryllium over three decades. From 1984 to 1987, personal breathing zone (PBZ) samples were also collected as part of the evaluation of a new high velocity/low volume local exhaust ventilation (HV/LV LEV) system. The purpose of this study was to determine how the two types of sampling data could be used for an exposure assessment in the beryllium shop.

Barnard, A.E.; Torma-Krajewski, J. [Department of Energy, Rocky Flats Field Office, Golden, CO (United States); Viet, S.M. [M.H. Chew & Associates, Inc., Golden, CO (United States)

1997-05-01T23:59:59.000Z

197

Integrating NRDA and CERCLA environmental evaluations at the Rocky Flats Plant: A case study  

SciTech Connect

The purpose of this paper is to briefly review cleanup regulations in reference to natural resource liability, protection, and restoration; to present a case study on the Rocky Flats Plant (RFP) showing how this DOE facility is approaching the task of integrating the ecological assessment/impact portion of three major regulatory mandates: Resource Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), and the National Environmental Policy Act (NEPA) with the Natural Resource Damage Assessment (NRDA) regulations using a flow chart depicting RCRA/CERCLA interim and final actions; to present what has and has not worked at the RFP; and, finally to suggest some technical strategies when planning for remediation and restoration in the NRD process that should be considered.

Knudsen, T.L.

1993-04-01T23:59:59.000Z

198

Denitration of Rocky Flats Ion-Exchange Resins: Recommendation of Denitration Processes, October 19, 1995  

SciTech Connect

Resin denitration via anion-exchange is an implementable process that can effectively mitigate the hazards associated with stored resins in which the bulk of the nitrate consists of an "exchangeable nitrate" ionically bound to the cationic sites of the anion-exchange resins. Salicylate has been selected as the exchange anion of choice because of its superior selectivity for the Rocky Flats resins and its unique potential for comprehensive recovery and recycle. This report outlines a single recommended resin denigration procedure that is reasonably independent of the resin composition and the current stored form. This procedure is not optimized but rather seeks to `over-treat' the resins so that a single procedure works for the variety of stored resins. The recommended treatment with sodium salicylate reduces resins by 95-99+% the measured exothermic behavior of the ion-exchange.

Jacob Espinoza; Mary Barr; Wayne Smith

1998-12-01T23:59:59.000Z

199

Integrating NRDA and CERCLA environmental evaluations at the Rocky Flats Plant: A case study  

SciTech Connect

The purpose of this paper is to briefly review cleanup regulations in reference to natural resource liability, protection, and restoration; to present a case study on the Rocky Flats Plant (RFP) showing how this DOE facility is approaching the task of integrating the ecological assessment/impact portion of three major regulatory mandates: Resource Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), and the National Environmental Policy Act (NEPA) with the Natural Resource Damage Assessment (NRDA) regulations using a flow chart depicting RCRA/CERCLA interim and final actions; to present what has and has not worked at the RFP; and, finally to suggest some technical strategies when planning for remediation and restoration in the NRD process that should be considered.

Knudsen, T.L.

1993-01-01T23:59:59.000Z

200

Analysis of offsite Emergency Planning Zones (EPZs) for the Rocky Flats Plant. [Contains glossary  

SciTech Connect

A quality assurance plan (QAP) is a documented description or a listing of the controls to be implemented to assure that an operation or activity is accomplished in a consistent manner and in accordance with requirements. Federal, state, and local governments require emergency planning for facilities that may affect the public in the event of an accidental release of nuclear or hazardous materials. One of the purposes of this EG G Rocky Flats Plant (RFP) Analysis of Offsite Emergency Planning Zones (EPZ) project is to identify the EPZs where actions could be necessary to protect public health. The RFP EPZ project is developing an interim basis for potential sheltering and evacuation recommendations in the event of an accidental release of radionuclides to the atmosphere from this facility. Also, RFP is developing EPZs for accidental releases of major nonradiological hazardous substances to the atmosphere, and will analyze the impacts of an unplanned surface water release from the facility.

Not Available

1990-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "rocky flats colorado" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Colorado | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 1998 1, 1998 EIS-0277: Record of Decision Management of Certain Plutonium Residues and Scrub Alloy Stored at the Rocky Flats Environmental Technology Site (December 1998) August 1, 1998 EIS-0277: Final Environmental Impact Statement Management of Certain Plutonium Residues and Scrub Alloy Stored at the Rocky Flats Environmental Technology Site November 19, 1996 EIS-0277: Notice of Intent to Prepare an Environmental Impact Statement Management of Certain Plutonium Residues and Scrub Alloy Stored at the Rocky Flats Environmental Technology Site July 17, 1996 EIS-0276: Notice of Intent to Prepare an Environmental Impact Statement Interim Storage of Plutonium at the Rocky Flats Environmental Technology Site, Golden, Colorado June 8, 1996 EA-0930: Final Environmental Assessment

202

Rocky Flats 10 year plan: over 500 structures to be demolished  

SciTech Connect

Rocky Flats Environmental Technology Site has prepared a Ten Year Plan (Plan) that demonstrates how the Site would achieve accelerated cleanup and rapidly reduce the risks the Site currently poses to its workers, the public, and the environment. A major element of the Plan is the decontamination and demolition of over 500 Site facilities, including all of the former nuclear production facilities, by the end of 2006. Facilities used for the storage of plutonium, treatment of low-level mixed waste, and several office building would remain until the plutonium is removed or there is no longer a need for the facility, in which case it would be demolished. While the Plan considers all aspects of the cleanup and closure, this paper focuses on the challenges posed by the removal of highly contaminated equipment and the demolition of structures. This paper describes near- term decommissioning projects as well as the long range plans and budgets. Cash flow ultimately controls schedule, and sharing of budget priorities among processing of special nuclear material, disposing of waste, and cleaning up the environment has to be juggled carefully to attain the goals of the Plan. The total cost of the Plan exceeds $5 billion, and over $1 billion will be spent on decommissioning activities. Following removal of the plutonium and the demolition of the plutonium storage and remaining Site facilities by the end of 2015, the cost to perform the long-term environmental monitoring at the Site is estimated to be $10 million per year.

Evans, B. [Kaiser-Hill L.L.C., Rocky Flats, CO (United States); Bengel, P. [Rocky Mountain Remediation Services, L.L.C., Rocky Flats, CO (United States)

1997-03-01T23:59:59.000Z

203

SCO shipments from Rocky Flats - Experience and current practice [Surface Contaminated Object  

SciTech Connect

Decommissioning activities at Rocky Flats Environmental Technology Site (RFETS) are expected to generate approximately 251,000 cubic meters of low-level radioactive waste. Almost half of this will be characterized and shipped as the Department of Transportation ''Surface Contaminated Object'' (SCO) shipping class. In the 2 years since an SCO characterization method was implemented, almost 11,000 of the 18,000 cubic meters of low-level waste were SCO. RFETS experience to-date using an SCO waste characterization method has shown significant time and cost savings, reduced errors, and enhanced employee safety. SCO waste is characterized prior to packaging, near the point of generation, by any of the site's 300 Radiological Control Technicians using inexpensive radiological control survey instruments. This reduces on-site waste container moves and eliminates radiometric analysis at centrally located drum or crate counters. Containers too large for crate counters can also be characterized. Current instrumentation is not adequate to take full advantage of the SCO regulations. Future improvements in the SCO characterization and shipping process are focused on use of larger and/or reusable containers, extended-range instruments, and additional statistical methods, so that the full extent of the SCO regulations can be used.

Bracken, Gary; Morris, Robert L.

2001-01-10T23:59:59.000Z

204

Evaluation of remedial alternatives for the Solar Ponds Plume, Rocky Flats Environmental Technology Site  

SciTech Connect

This paper describes the process used to select a remedial alternative for handling contaminated groundwater emanating from the Solar Evaporation Ponds (Solar Ponds) at the Rocky Flats Environmental Technology Site (RFETS) and prevent it from reaching the nearest surface water body, North Walnut Creek. Preliminary results of field investigations conducted to provide additional information for the alternatives analysis are also presented. The contaminated groundwater is referred to as the Solar Ponds Plume (SPP). The primary contaminants in the SPP are nitrate and uranium; however, some metals exceed the site action levels at several locations and volatile organic compounds, originating from other sources, also have been detected. Currently the SPP, local surface water runoff, and infiltrated precipitation are collected by a trench system located downgradient of the Solar Ponds and pumped to three storage tanks. The water (two to three million gallons annually) is then pumped to an on-site treatment plant for evaporation at an approximate cost of $7.57 per liter.

Hranac, K.C. [Morrison Knudsen Corp., Golden, CO (United States). Rocky Flats Environmental Technology Site; Chromec, F.W.; Fiehweg, R. [Rocky Mountain Remediation Services, Golden, CO (United States). Rocky Flats Environmental Technology Site; Hopkins, J. [Rocky Mountain Remediation Services, Los Alamos, NM (United States)

1998-07-01T23:59:59.000Z

205

Nondestructive assay (NDA) of fissile material solutions in tanks at Rocky Flats Environmental Technology Site  

SciTech Connect

Nondestructive assay of holdup in solution tanks at Rocky Flats has been performed to address criticality safety concerns since 1974. Destructive analysis techniques were used for quantification of the fissile material content of the tanks. With termination of operations in 1989, including sparging and sampling of tanks, a need arose for nondestructive assay of solutions in tanks to confirm previous inventory values. Gamma ray measurement methodologies were investigated and several techniques, including Poor Man`s Densitometry were implemented. These techniques have been applied to several different types of tanks including: annular, raschig ring filled, and pencil tanks. For the annular tanks ``Poor Man`s Densitometry`` is used, with the densities of the measured solutions normalized to the value of one ``accepted`` concentration tank. Measurement uncertainties for this technique has been better than was anticipated. Measurements are also performed at several levels to attempt to detect variations in density. For the current tank draining program, solution in tanks is assayed by the NDA gamma-ray technique before draining. Measurement results were obtained for plutonium, uranium, and mixtures of U/Pu solutions for concentrations ranging from less than 0.5 g/l to 150 g/l. Tanks with expected concentrations were used to establish a relationship between concentration and count rate. ``Bootstrapping`` calibration techniques were used in some cases to obtain quantitative results.

Fleissner, J.G.; Lamb, F.W.; Maul, M.R.

1995-07-01T23:59:59.000Z

206

Disposition of Uranium -233 (sup 233U) in Plutonium Metal and Oxide at the Rocky Flats Environmental Technology Site  

SciTech Connect

This report documents the position that the concentration of Uranium-233 ({sup 233}U) in plutonium metal and oxide currently stored at the DOE Rocky Flats Environmental Technology Site (RFETS) is well below the maximum permissible stabilization, packaging, shipping and storage limits. The {sup 233}U stabilization, packaging and storage limit is 0.5 weight percent (wt%), which is also the shipping limit maximum. These two plutonium products (metal and oxide) are scheduled for processing through the Building 371 Plutonium Stabilization and Packaging System (PuSPS). This justification is supported by written technical reports, personnel interviews, and nuclear material inventories, as compiled in the ''History of Uranium-233 ({sup 233}U) Processing at the Rocky Flats Plant In Support of the RFETS Acceptable Knowledge Program'' RS-090-056, April 1, 1999. Relevant data from this report is summarized for application to the PuSPS metal and oxide processing campaigns.

Freiboth, Cameron J.; Gibbs, Frank E.

2000-03-01T23:59:59.000Z

207

Rocky Flats Plant: Test bed for transitioning from weapons production mission to environmental restoration, waste management, and economic development missions  

SciTech Connect

Redirection of Rocky Flats Plant`s (RF) mission is an inevitable result of changes in the worldwide social, political, and environmental factors. These changes were exemplified in the cancellation of the W-88 Warhead in January 1992, by the President of the United States. These unprecedented changes have altered the RF`s traditional nuclear weapons production mission to the transition mission, i.e., cleanup, preparation for deactivation and decontamination, decommissioning, dismantlement and demolition, and when appropriate, economic development, of the facilities. The purpose of this paper is to describe the essentials of the technical approach and management actions advanced by EG&G Rocky Flats, Inc., to organize, staff, direct, and control the activities necessary to transition the RF from its historical weapons production mission to the transition mission.

Benjamin, A.; Murthy, K.S.; Krenzer, R.W.; Williams, R.E.; Detamore, J.A.; Brown, C.M.; Francis, G.E.; Lucerna, J.J.

1993-01-07T23:59:59.000Z

208

The September 1957 Rocky Flats fire: A guide to record series of the Department of Energy and its contractors  

SciTech Connect

The primary purpose of this guide is to help the DOE locate and make available information relating to the 1957 Rocky Flats fire. The records are arranged into six categories: administrative and general; facilities and equipment; production and materials handling; waste management; workplace and environmental monitoring; and employee occupational exposure and health. A brief explanation of each category follows. The administrative and general section pertains to the administration of individual contractor organizations and DOE divisions at Rocky Flats. It also contains records which encompass several different subject areas and therefore can not be placed in a single category. The facilities and equipment category relates to the routine construction and maintenance of plant buildings as well as the purchase and installation of equipment. The production and materials handling records relate primarily to the inventory and production of nuclear materials and weapons components. The waste management records series found under this heading relate to the storage, handling, treatment, and disposal of radioactive, chemical or mixed materials produced or used at Rocky Flats. The records consist mostly of waste sampling and shipment records. The workplace and environmental monitoring records series found in this section pertain to monitoring of the workplace. The section also includes records that document efforts to monitor the environment outside of buildings, either onsite or offsite. Records in this category consist of sampling data and environmental impact reports. The employee occupational exposure and health section pertains to documentation relating to the health and occupational exposures of employees and visitors at Rocky Flats. Records series consist generally of dosimeter data, radiation exposure records, and medical records. Many of the records contain personal data pertaining to individual employees and may therefore be Privacy Act systems and records.

NONE

1995-07-19T23:59:59.000Z

209

Build Rocky Flats Environmental Technology site production prototype modular treatment system for stand alone core capability for residue unpack, sort, assay, repack  

SciTech Connect

This document describes a portable and modular suit of equipment that upfront and near-term accomplishes a sorting process that documents and removes Rocky Flats Environmental Technology Site (RFETS) residue and waste from site inventory.

Hildner, R.A.; Zygmunt, S.J.

1997-01-01T23:59:59.000Z

210

Evaluation of Atmospheric Transport Models for Use in Phase II of the Historical Public Exposures Studies at the Rocky Flats Plant  

Science Journals Connector (OSTI)

Five atmospheric transport models were evaluated for use in Phase II of the Historical Public Exposures Studies at the Rocky Flats Plant. Models included a simple straight-line ... hexafluoride tracer measurement...

Arthur S. Rood; George G. Killough; John E. Till

1999-08-01T23:59:59.000Z

211

EA-1120: Solid Residues Treatment, Repackaging and Storage at the Rocky  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Solid Residues Treatment, Repackaging and Storage at the 0: Solid Residues Treatment, Repackaging and Storage at the Rocky Flats Environmental Technology Site, Golden, Colorado EA-1120: Solid Residues Treatment, Repackaging and Storage at the Rocky Flats Environmental Technology Site, Golden, Colorado SUMMARY This EA evaluates the environmental impacts of the proposal to stabilize, if necessary, and/or repackage the residues for safe interim storage at the Site while awaiting the completion and opening of a suitable repository to which they would be shipped for disposal from the U.S. Department of Energy Rocky Flats Environmental Technology Site in Golden, Colorado. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD April 1, 1996 EA-1120: Finding of No Significant Impact Solid Residues Treatment, Repackaging and Storage at the Rocky Flats

212

Late Miocene Erosion and Evolution of Topography along the Western Slope of the Colorado Rockies.  

E-Print Network (OSTI)

??It is increasingly apparent that dynamic effects associated with changes in mantle flow and buoyancy can influence the evolution of surface topography. In the Rocky (more)

Rosenberg, Russell

2013-01-01T23:59:59.000Z

213

Colorado | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31, 2002 31, 2002 Landfill Cover Revegetation at the Rocky Flats Environmental Technology Site Landfill Cover Revegetation at the Rocky Flats Environmental Technology Site November 13, 2002 EA-1452: Finding of No Significant Impact Ground Water Compliance at the Durango, Colorado UMTRA Project Site July 1, 2002 EA-1399: Final Environmental Assessment Ground Water Compliance at the Gunnison, Colorado, UMTRA Project Site May 31, 2002 EA-1378: Finding of No Significant Impact Site-Wide Environmental Assessment of National Renewable Energy Laboratory's National Wind Technology Center, Golden, Colorado September 3, 2001 EA-1354: Final Environmental Assessment Fort Collins 115kV Transmission Line Upgrade Project May 1, 2001 EA-1371: Final Environmental Assessment Integrated Natural Resources Management Plan for Rock Creek Reserve

214

Report on "Audit of the Contractor Incentive Programs at the Rocky Flats Environmental Technology Site, IG-0411  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 13, 1997 MEMORANDUM FOR THE SECRETARY FROM: John C. Layton Inspector General SUBJECT: INFORMATION: Report on "Audit of the Contractor Incentive Programs at the Rocky Flats Environmental Technology Site" BACKGROUND: The Department of Energy (Department) is using performance-based contracts to solve problems associated with its traditional management and operating contracts. These performance-based contracts are to include cost reduction incentive programs to motivate contractors to reduce costs by employing innovative practices. Additionally, these contracts are to encourage and reward superior, results-oriented performance through a clearly

215

A rational approach for evaluation and screening of treatment and disposal options for the solar pond sludges at Rocky Flats  

SciTech Connect

This document consists of information about the treatment options for the sludge that is located in the evaporation ponds at the Rocky Flats Plant. The sludges are mixed low-level radioactive wastes whose composition and character were variable. Sludges similar to these are typically treated prior to ultimate disposal. Disposal of treated sludges includes both on-site and off-site options. The rational approach described in this paper is useful for technology evaluation and screening because it provides a format for developing objectives, listing alternatives, and weighing the alternatives against the objectives and against each other.

Dickerson, K.S.

1995-12-31T23:59:59.000Z

216

Identification and quantification of the source terms for uranium in surface waters collected at the Rocky Flats facility  

Science Journals Connector (OSTI)

The intent of this study was to determine the fraction of soluble uranium attributable to the Rocky Flats Plant (RFP) operations which is recoverable from waters and suspended sediments drawn from ponds on site at RFP. Samples were collected from late 1992 through 1993. Thermal ionization mass spectrometry (TIMS) measurement techniques indicate that the water samples contain both naturally occurring uranium and depleted uranium. The uranium concentrations in the waters collected from the terminal ponds contained 0.5% or less of the interim standard calculated derived concentration guide for uranium in waters available to the public.

D.W. Efurd; D.J. Rokop; R.D. Aguilar; F.R. Roensch; J.C. Banar; R.E. Perrin

1995-01-01T23:59:59.000Z

217

Integrated chemical management system: A tool for managing chemical information at the Rocky Flats Environmental Technology Site  

SciTech Connect

The Integrated Chemical Management System is a computer-based chemical information at the Rocky Flats Environmental Technology Site. Chemical containers are identified by bar code labels and information on the type, quantity and location of chemicals are tracked on individual data bases in separate buildings. Chemical inventories from multiple buildings are uploaded to a central sitewide chemical data base where reports are available from Product, Waste, and Chemical Use modules. Hazardous chemical information is provided by a separate Material Safety Data Sheet module and excess chemicals are traded between chemical owners and users with the aid of the Chemical Exchange Module.

Costain, D. [Kaiser-Hill Co., Golden, CO (United States)

1995-07-01T23:59:59.000Z

218

About Rocky Mountain Region  

NLE Websites -- All DOE Office Websites (Extended Search)

Rates About the Rocky Mountain Region RM Office The Platte River Power Authority in Colorado, Nebraska Public Power District, Kansas Electric Power Cooperative and Wyoming...

219

Rocky Mountain's Home page  

NLE Websites -- All DOE Office Websites (Extended Search)

Mountain Region service area The Rocky Mountain Region is one of four regions of the Western Area Power Administration. RM sells power in Colorado, most of Wyoming, Nebraska...

220

Colorado | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 21, 2012 December 21, 2012 The Rocky Flats Plant was first established in 1951 as a nuclear weapons manufacturing facility. Today, almost 4,000 acres make up the Rocky Flats National Wildlife Refuge. Located just 16 miles northwest of Denver, Colorado, the refuge provides a habitat for migratory birds and mammals. | Photo courtesy of the U.S. Department of Energy. Photo of the Week: Rocky Flats Wildlife Refuge Check out our favorite energy-related photos! November 1, 2012 Audit Report: OAS-RA-L-13-01 Implementation of the Department of Energy's Concentrating Solar Power Program October 31, 2012 EA-1914: Notice of Scoping of an Environmental Assessment National Renewable Energy Laboratory (NREL) National Wind Technology Center (NWTC) Site-Wide Environmental Assessment, Golden, CO

Note: This page contains sample records for the topic "rocky flats colorado" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Rocky Flats Environmental Technology Site Waste Compliance Order, August 21, 1997 Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7-08-21-02 7-08-21-02 State Colorado Agreement Type Consent Order Legal Driver(s) RCRA Scope Summary Establish compliance requirements and schedules for the implementation of a "Waste Chemical Project Plan" Parties DOE; Kaiser-Hill Company, LLC; Colorado Department of Public Health and Environment Date 8/21/1997 SCOPE * Establish compliance requirements and schedules for the implementation of a "Waste Chemical Project Plan" (the "Waste Chemical Plan") at RFETS. * Resolve violations of the Colorado Hazardous Waste Act and the Colorado Hazardous Waste Regulations. ESTABLISHING MILESTONES * Activities in the Waste Chemical Plan shall be completed by no later than December 31, 1999, except as to Excluded Chemicals (discussed in Paragraph 22 of this Order

222

Rocky Flats Environmental Technology Site Idle Equipment, August 21, 1997 Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Number: 97-08-21-01 Number: 97-08-21-01 State Colorado Agreement Type Consent Order Legal Driver(s) RCRA Scope Summary Establish compliance requirements and schedules for the implementation of 1) the Management Plan for Material Contained in Idle Equipment, 2) the 1997 Hazardous Waste Tank Management Plan Parties DOE; Kaiser-Hill Company, LLC; Colorado Department of Public Health and Environment (CDPHE) Date 8/21/1997 SCOPE * Establish compliance requirements and schedules for the implementation of 1) the Management Plan for Material Contained in Idle Equipment, 2) the 1997 Hazardous Waste Tank Management Plan. * Resolve violations of the Colorado Hazardous Waste Act and the Colorado Hazardous Waste Regulations identified therein. ESTABLISHING MILESTONES * DOE and K-H shall annually submit to the Department, for information only, a

223

Long-Term Surveillance and Maintenance at the Rocky Flats Site: Lessons Learned Based on the First Years Real Experiences From the Field  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Long-Term Surveillance and Maintenance at Rocky Flats: Early Experiences and Lessons Learned - 8350 S. Surovchak U.S. Department of Energy, Office of Legacy Management 11025 Dover Street, Suite 1000, Westminster, CO 80021 L. Kaiser, R. DiSalvo, J. Boylan, G. Squibb, J. Nelson, B. Darr, M. Hanson S.M. Stoller Corporation 11025 Dover Street, Suite 1000, Westminster, CO 80021 ABSTRACT The U.S. Department of Energy's (DOE's) Rocky Flats Site was established in 1951 as part of the United States' nationwide nuclear weapons complex to manufacture nuclear weapons components. In 1992 weapons production halted, and the Rocky Flats mission changed to include environmental investigations, cleanup, and site closure. In October 2005, DOE and its

224

Rocky Mountain NP, Colorado Nitrogen emissions from a variety of human made sources, including ammonia  

E-Print Network (OSTI)

and gas production, wastewater treatment plants, landfills, fertilized crops, and livestock production comes into RMNP from both urban and rural areas in Colorado as well as from other states. Agricultural

MacDonald, Lee

225

A decision analysis method for selection of waste minimization process options for TRU mixed material at Rocky Flats  

SciTech Connect

When plutonium production operations were halted at the Rocky Flats Plant, there remained a volume of material that was retained in order that its plutonium content could be reclaimed. This material, known as residue, is transuranic and mixed transuranic material with a plutonium content above what was called the ``economic discard limit,`` or EDL. The EDL was defined in terms of each type of residue material, and each type of material is given an Item Description Code, or IDC. Residue IDCs have been grouped into general category descriptions which include plutonium (Pu) nitrate solutions, Pu chloride solutions, salts, ash, metal, filters, combustibles, graphite, crucibles, glass, resins, gloves, firebrick, and sludges. Similar material exists both below and above the EDL, with material with the (previous) economic potential for reclamation of plutonium classified as residue.

Williams, R.E.; Dustin, D.F.

1994-02-01T23:59:59.000Z

226

In situ remediation of plutonium from glovebox exhaust ducts at the Department of Energy`s Rocky Flats Plant  

SciTech Connect

Plutonium and other miscellaneous hold-up materials have been accumulating in the glovebox exhaust ducts at the Rocky Flats Plant over the 40 years of weapons production at the site. The Duct Remediation Project was undertaken to assess the safety impacts of this material, and to remove it from the ductwork. The project necessitated the development of specialized tools, equipment and methods to remediate the material from continuously operating ventilation systems. Special engineered access locations were also required to provide access to the ductwork, and to ensure that safety and system operability were not degraded as a result of the remediation efforts. Operations personnel underwent significant training and development, and became an important asset to the success of the project. In total, the project succeeded in removing over 40 kilograms of plutonium-bearing material from one of the major weapons production buildings at the plant.

Dugdale, J.S.; Humiston, T.J.; Omer, G.E.

1993-10-01T23:59:59.000Z

227

Systematic Evaluation Program (SEP) at Rocky Flats Plant: An overview of practical management issues for evaluation of natural phenomena hazards  

SciTech Connect

Many of the buildings at the Rocky Flats Plant were designed and built before modern standards were developed, including standards for protection against extreme natural phenomenon such as tornadoes, earthquakes, and floods. The purpose of the SEP is to establish an integrated approach to assessing the design adequacy of specific high and moderate hazard Rocky Flats facilities from a safety perspective and to establish a basis for defining any needed facility improvements. The SEP is to be carried out in three Phases. In Phase 1, topics to be evaluated and an evaluation plan for each topic were developed. Any differences between Current Design Requirements (CDR) or acceptance criteria and the design of existing facilities, will be identified during Phase 2 and assessed using an integrated systematic approach during Phase 3. The integrated assessment performed during Phase 3 provides a process for evaluating the differences between existing facility design and CDRs so that decisions on corrective actions can be made on the basis of relative risk reduction and cost effectiveness. These efforts will ensure that a balanced and integrated level of safety is achieved for long-term operation of these buildings. Through appropriate selection of topics and identification of the structures, systems, and components to be evaluated, the SEP will address outstanding design issues related to the prevention and mitigation of design basis accidents, including those arising from natural phenomena. The objective of the SEP is not to bring these buildings into strict compliance with current requirements, but rather to ensure that an adequate level of safety is achieved in an economical fashion.

Badwan, F.M. [EG and G Rocky Flats, Inc., Golden, CO (United States). Rocky Flats Plant; Herring, K.S. [NUS Corp. (United States)

1993-08-01T23:59:59.000Z

228

Report on Matters Identified at the Rocky Flats Field Office During the Audit of the Department's Consolidated Fiscal Year 1996 Financial Statements, WR-FS-97-03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY OFFICE OF INSPECTOR GENERAL REPORT ON MATTERS IDENTIFIED AT THE ROCKY FLATS FIELD OFFICE DURING THE AUDIT OF THE DEPARTMENTmS CONSOLIDATED FISCAL YEAR 1996 FINANCIAL STATEMENTS The Office of Inspector General wants to make the distribution of its audit reports as customer friendly and cost effective as

229

EA-1120: Solid Residues Treatment, Repackaging and Storage at the Rocky  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

20: Solid Residues Treatment, Repackaging and Storage at the 20: Solid Residues Treatment, Repackaging and Storage at the Rocky Flats Environmental Technology Site, Golden, Colorado EA-1120: Solid Residues Treatment, Repackaging and Storage at the Rocky Flats Environmental Technology Site, Golden, Colorado SUMMARY This EA evaluates the environmental impacts of the proposal to stabilize, if necessary, and/or repackage the residues for safe interim storage at the Site while awaiting the completion and opening of a suitable repository to which they would be shipped for disposal from the U.S. Department of Energy Rocky Flats Environmental Technology Site in Golden, Colorado. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD April 1, 1996 EA-1120: Finding of No Significant Impact

230

Rocky Flats Environmental Technology Site Treatment Plan Compliance Order, October 3, 1995 Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Order Requiring Compliance with Site Treatment Plan Order Requiring Compliance with Site Treatment Plan No. 95-10-03-01 State Colorado Agreement Type Consent Order Legal Driver(s) FFCAct Scope Summary Approve with modifications the Proposed Site Treatment Plan for RFETS (MLLW); establish a Mixed Transuranic waste Agreement Parties DOE; Colorado Department of Public Health and Environment (CDPHE) Date 10/3/1995 SCOPE * In regard to Mixed Low-Level waste, approve with modifications the Proposed Site Treatment Plan for RFETS and require compliance by DOE with the modified and approved Site Treatment Plan. * In regard to Mixed Transuranic waste, establish and ensure compliance with an Agreement addressing compliance with the Hazardous and Solid Waste Amendments of 1984 to RCRA. ESTABLISHING MILESTONES

231

Anthropogenic 236U at Rocky Flats, Ashtabula river harbor, and Mersey estuary: three case studies by sector inductively coupled plasma mass spectrometry  

Science Journals Connector (OSTI)

236U (t1/2=2.3107 y) is formed as a result of thermal neutron capture by 235U. In naturally occurring U ores, where a high neutron flux is present from spontaneous fission of 238U, 236U/238U atom ratios are ~10?4 ppm. In the natural Earths crust, unaffected by nuclear fallout, these ratios are expected to be on the order of 10?8 ppm. Reactor-irradiated U, however, exhibits high 236U/238U atom ratios approaching 104 ppm. As a result, the presence of very small quantities of reactor-irradiated U will significantly enhance the background 236U/238U atom ratio. When sufficiently elevated 236U/238U ratios are present, the determination of 236U/238U by rapid inductively coupled plasma mass spectrometric (ICPMS) methods is attractive. We have used sector ICPMS at medium resolving power (R=3440) to measure 236U/238U atom ratios with a determination limit of 0.2 ppm. The limiting factors in the measurement are the 235U1H+ isobar and background signal at m/z 236 arising from the 238U+ peak tail. Based upon the analysis of replicates and considerations of possible systematic errors, uncertainties of 5% are found for 236U/238U atom ratios of 1?100 ppm. This procedure has been demonstrated in studies of anthropogenic 236U in the environment at three locations: (a) offsite soils from the vicinity of the Rocky Flats Environmental Technology site (Golden, Colorado, USA); (b) sediments from the Ashtabula River (Ohio, USA); and (c) sediments from the Mersey estuary (Liverpool, UK). In each of these three locations, definite plumes of elevated 236U/238U are identified and characterized. Maximum 236U/238U atom ratios observed in RFETS-vicinity soils, the Ashtabula River, and the Mersey Estuary are 2.8, 140, and 4.4 ppm, respectively.

M.E Ketterer; K.M Hafer; C.L Link; C.S Royden; W.J Hartsock

2003-01-01T23:59:59.000Z

232

Quaternary faults of the central Rocky Mountains, Colorado: A new seismotectonic evaluation  

SciTech Connect

Quaternary faults in the central Rocky Mountain of CO exhibit normal displacement, are generally parallel to the strike of pre-existing Larmide structures, and typically occur in the hanging walls of Laramide thrust faults. These observations are consistent with models in which Mesozoic thrust faults are being reactivated as normal faults in the contemporary extensional tectonic setting. To assess the seismogenic potential of these faults, the authors evaluated the recency of fault movement and style of deformation via aerial reconnaissance, interpretation of aerial photography and field mapping of selected sites. The 82-km-long Red Rocks-Climarron fault zone shows evidence of late Quaternary displacement and may be capable of producing an M[>=]6.75 earthquake based on its total fault length and inferred fault width. Earthquake hypocenters indicate that the thickness of the seismogence crust in CO is similar to much of the western US (ca. 15 km). In additional to tectonic deformation, numerous faults and lineaments have been identified in the Paradox Basin and along the southern Grand Hogback monocline that are active due to diapiric movement of halite. In particular, active deformation along the Grand Hogback is limited to portions of the structure underlain by a 3-km-deep Pennsylvania halite basin. Because Quaternary deformation along and near these large Laramide structures is due to the movement of halite rather than deep-seated tectonism, the maximum size of a potential earthquake is limited by the down-dip width and lateral extent of fault planes within brittle rocks overlying the halite. The authors infer that the maximum depth of brittle faulting due to diapiric halite flow is 6 km, and the earthquakes larger than M 5 are unlikely to occur on faults associated with the Grand Hogback and salt anticlines of the Paradox Basin. The 1984 Carbondale earthquake swarm (M[<=]3.2) may have been the result of such faulting.

Unruh, J.R.; Noller, J.S.; Lettis, W.R. (William Lettis and Association, Inc., Oakland, CA (United States)); Wong, I.G.; Sawyer, T.L.; Bott, J.D.J. (Woodward-Clyde Federal Services, Oakland, CA (United States))

1993-04-01T23:59:59.000Z

233

Report of the oversight assessment of the operational readiness review of the Rocky Flats Plant, Building 707  

SciTech Connect

This report presents the results of an oversight assessment (OA) conducted by the US Department of Energy`s (DOE) office of Environment, Safety and Health (EH) of the Operational Readiness Review (ORR) activities for the resumption of Building 707 operations at the Rocky Flats Plant (RFP). The EH OA was simultaneously conducted with the Office of Defense Programs (DP) line management ORR, which was conducted from September 21 to October 2, 1992, and November 2 to 13, 1992. The EH OA evaluated the comprehensiveness and effectiveness of the DP ORR. Based on its oversight assessment, the EH OA believes that Building 707 operations may be safely resumed contingent upon satisfactory resolution of all DP ORR findings. The EH OA determined that the DP ORR was conducted in a comprehensive and effective manner and represents an adequate basis for recommending resumption of Building 707 operations. The EH OA was based primarily on an evaluation of the comprehensiveness and effectiveness of the DP ORR and addressed the following areas: Management and Organization, Industrial Safety, Fire Protection, Industrial Hygiene, Conduct of Operations, Maintenance, Quality Assurance, and Training. In a limited number of these areas, the EH OA conducted independent vertical-slice reviews DP ORR results.

Krupar, J.J. Jr.

1992-12-18T23:59:59.000Z

234

Report of the oversight assessment of the operational readiness review of the Rocky Flats Plant, Building 707  

SciTech Connect

This report presents the results of an oversight assessment (OA) conducted by the US Department of Energy's (DOE) office of Environment, Safety and Health (EH) of the Operational Readiness Review (ORR) activities for the resumption of Building 707 operations at the Rocky Flats Plant (RFP). The EH OA was simultaneously conducted with the Office of Defense Programs (DP) line management ORR, which was conducted from September 21 to October 2, 1992, and November 2 to 13, 1992. The EH OA evaluated the comprehensiveness and effectiveness of the DP ORR. Based on its oversight assessment, the EH OA believes that Building 707 operations may be safely resumed contingent upon satisfactory resolution of all DP ORR findings. The EH OA determined that the DP ORR was conducted in a comprehensive and effective manner and represents an adequate basis for recommending resumption of Building 707 operations. The EH OA was based primarily on an evaluation of the comprehensiveness and effectiveness of the DP ORR and addressed the following areas: Management and Organization, Industrial Safety, Fire Protection, Industrial Hygiene, Conduct of Operations, Maintenance, Quality Assurance, and Training. In a limited number of these areas, the EH OA conducted independent vertical-slice reviews DP ORR results.

Krupar, J.J. Jr.

1992-12-18T23:59:59.000Z

235

Cost Estimating for Decommissioning of a Plutonium Facility--Lessons Learned From The Rocky Flats Building 771 Project  

SciTech Connect

The Rocky Flats Closure Site is implementing an aggressive approach in an attempt to complete Site closure by 2006. The replanning effort to meet this goal required that the life-cycle decommissioning effort for the Site and for the major individual facilities be reexamined in detail. As part of the overall effort, the cost estimate for the Building 771 decommissioning project was revised to incorporate both actual cost data from a recently-completed similar project and detailed planning for all activities. This paper provides a brief overview of the replanning process and the original estimate, and then discusses the modifications to that estimate to reflect new data, methods, and planning rigor. It provides the new work breakdown structure and discusses the reasons for the final arrangement chosen. It follows with the process used to assign scope, cost, and schedule elements within the new structure, and development of the new code of accounts. Finally, it describes the project control methodology used to track the project, and provides lessons learned on cost tracking in the decommissioning environment.

Stevens, J. L.; Titus, R.; Sanford, P. C.

2002-02-26T23:59:59.000Z

236

Radcalc for windows benchmark study: A comparison of software results with Rocky Flats hydrogen gas generation data  

SciTech Connect

Radcalc for Windows Version 2.01 is a user-friendly software program developed by Waste Management Federal Services, Inc., Northwest Operations for the U.S. Department of Energy (McFadden et al. 1998). It is used for transportation and packaging applications in the shipment of radioactive waste materials. Among its applications are the classification of waste per the US. Department of Transportation regulations, the calculation of decay heat and daughter products, and the calculation of the radiolytic production of hydrogen gas. The Radcalc program has been extensively tested and validated (Green et al. 1995, McFadden et al. 1998) by comparison of each Radcalc algorithm to hand calculations. An opportunity to benchmark Radcalc hydrogen gas generation calculations to experimental data arose when the Rocky Flats Environmental Technology Site (RFETS) Residue Stabilization Program collected hydrogen gas generation data to determine compliance with requirements for shipment of waste in the TRUPACT-II (Schierloh 1998). The residue/waste drums tested at RFETS contain contaminated, solid, inorganic materials in polyethylene bags. The contamination is predominantly due to plutonium and americium isotopes. The information provided by Schierloh (1 998) of RFETS includes decay heat, hydrogen gas generation rates, calculated G{sub eff} values, and waste material type, making the experimental data ideal for benchmarking Radcalc. The following sections discuss the RFETS data and the Radcalc cases modeled with the data. Results are tabulated and also provided graphically.

MCFADDEN, J.G.

1999-07-19T23:59:59.000Z

237

Rocky Flats CAAS System Recalibrated, Retested, and Analyzed to Install in the Criticality Experiments Facility at the Nevada Test Site  

SciTech Connect

Neutron detectors and control panels transferred from the Rocky Flats Plant (RFP) were recalibrated and retested for redeployment to the CEF. Testing and calibration were successful with no failure to any equipment. Detector sensitivity was tested at a TRIGA reactor, and the response to thermal neutron flux was satisfactory. MCNP calculated minimum fission yield ({approx} 2 x 10{sup 15} fissions) was applied to determine the thermal flux at selected detector positions at the CEF. Thermal flux levels were greater than 6.39 x 10{sup 6} (n/cm{sup 2}-sec), which was about four orders of magnitude greater than the minimum alarm flux. Calculations of detector survivable distances indicate that, to be out of lethal area, a detector needs to be placed greater than 15 ft away from a maximum credible source. MCNP calculated flux/dose results were independently verified by COG. CAAS calibration and the testing confirmed that the RFP CAAS system is performing its functions as expected. New criteria for the CAAS detector placement and 12-rad zone boundaries at the CEF are established. All of the CAAS related documents and hardware have been transferred from LLNL to NSTec for installation at the CEF high bay areas.

Kim, S; Heinrichs, D; Biswas, D; Huang, S; Dulik, G; Scorby, J; Boussoufi, M; Liu, B; Wilson, R

2009-05-27T23:59:59.000Z

238

Analysis of offsite emergency planning zones (EPZs) for the Rocky Flats Plant. Phase 3, Sitewide spectrum-of-accidents and bounding EPZ analysis  

SciTech Connect

This Charter provides the basis for a cooperative, interagency effort to conduct Phase III of the ``Analysis of Offsite Emergency Planning Zones (EPZs) for the Rocky Flats Plant`` Project. The purpose of this Charter is to define the Project and establish an Oversight Committee management structure together with responsibilities and commitments. This Charter establishes a commitment on the part of the signing agencies to participate in a Phase III EPZ analysis to refine existing EPZs for the Rocky Flats Plant. These agencies agree to commit resources to this Project to fulfill their identified roles. The specific types and levels of resources committed by each agency will be determined as part of the Project planning process. This Charter does not commit any agency to any specific level of effort or resources. It does, however, commit these agencies to support the Phase III analysis to completion.

Petrocchi, A.J.; Smith, M.L.

1993-10-25T23:59:59.000Z

239

Evaluation of atmospheric transport models for use in Phase II of the historical public exposures studies at the Rocky Flats Plant  

SciTech Connect

Five atmospheric transport models were evaluated for use in Phase II of the Historical Public Exposures Studies at the Rocky Flats Plant. Models included a simple straight-line Gaussian plume model (ISCST2), several integrated puff models (RATCHET, TRIAD, and INPUFF2), and a complex terrain model (TRAC). Evaluations were based on how well model predictions compared with sulfur hexafluoride tracer measurements taken in the vicinity of Rocky Flats in February 1991. Twelve separate tracer experiments were conducted, each lasting 9 hr and measured at 140 samplers in arcs 8 and 16 km from the release point at Rocky Flats. Four modeling objectives were defined based on the endpoints of the overall study: (1) the unpaired maximum hourly average concentration, (2) paired time-averaged concentration, (3) unpaired time-averaged concentration, and (4) arc-integrated concentration. Performance measures were used to evaluate models and focused on the geometric mean and standard deviation of the predicted-to-observed ratio and the correlation coefficient between predicted and observed concentrations. No one model consistently outperformed the others in all modeling objectives and performance measures. The overall performance of the RATCHET model was somewhat better than the other models.

Rood, A.S.; Killough, G.G.; Till, J.E.

1999-08-01T23:59:59.000Z

240

X-ray absorption fine structure spectroscopic determination of plutonium speciation at the Rocky Flats environmental technology  

SciTech Connect

X-ray Absorption Fine Structure spectroscopy was used to probe the speciation of the ppm level Pu in thirteen soil and concrete samples from the Rocky Flats Environmental Technology Site in support of the site remediation effort that has been successfully completed since these measurements. In addition to X-ray Absorption Near Edge Spectra, two of the samples yielded Extended X-ray Absorption Fine Structure spectra that could be analyzed by curve-fits. Most of these spectra exhibited features consistent with PU(IV), and more specificaJly, PuO{sub 2+x}-type speciation. Two were ambiguous, possibly indicating that Pu that was originally present in a different form was transforming into PuO{sub 2+x}, and one was interpreted as demonstrating the presence of an unusual Pu(VI) compound, consistent with its source being spills from a PUREX purification line onto a concrete floor and the resultant extreme conditions. These experimental results therefore validated models that predicted that insoluble PuO{sub 2+x} would be the most stable form of Pu in equilibrium with air and water even when the source terms were most likely Pu metal with organic compounds or a Pu fire. A corollary of these models' predictions and other in situ observations is therefore that the minimal transport of Pu that occurred on the site was via the resuspension and mobilization of colloidal particles. Under these conditions, the small amounts of diffusely distributed Pu that were left on the site after its remediation pose only a negligible hazard.

Lezama-pacheco, Juan S [Los Alamos National Laboratory; Conradson, Steven D [Los Alamos National Laboratory; Clark, David L [Los Alamos National Laboratory

2008-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "rocky flats colorado" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Biotic and Abiotic Processes Controlling Water Chemistry During Snowmelt at Rabbit Ears Pass, Rocky Mountains, Colorado, U. S. A.  

Science Journals Connector (OSTI)

The chemical composition of snowmelt, groundwater, and streamwater was monitored during the spring of 1991 and 1992 in a 200-ha subalpine catchment on the western flank of the Rocky Mountains near Steamboat Sprin...

Norman E. Peters; George H. Leavesley

1995-01-01T23:59:59.000Z

242

Biotic and abiotic processes controlling water chemistry during snowmelt at rabbit ears pass, Rocky Mountains, Colorado, U.S.A.  

Science Journals Connector (OSTI)

The chemical composition of snowmelt, groundwater, and streamwater was monitored during the spring of 1991 and 1992 in a 200-ha subalpine catchment on the western flank of the Rocky Mountains near Steamboat Sprin...

Norman E. Peters; George H. Leavesley

1995-01-01T23:59:59.000Z

243

A Study of the Stability and Characterization Plutonium Dioxide and Chemical Characterization [of] Rocky Flats and Los Alamos Plutonium-Containing Incinerator Ash  

SciTech Connect

In the presentation ''A Study of the Stability and Characterization of Plutonium Dioxide'', the authors discuss their recent work on actinide stabilities and characterization, in particular, plutonium dioxide PuO{sub 2}. Earlier studies have indicated that PuO{sub 2} has the fluorite structure of CaF{sub 2} and typical oxide semiconductor properties. However, detailed results on the bulk electronic structure of this important actinide oxide have not been available. The authors have used all-electron, full potential linear combinations Gaussian type orbitals fitting function (LCGTO-FF) method to study PuO{sub 2}. The LCGTO-FF technique characterized by its use of three independent GTO basis sets to expand the orbitals, charge density, and exchange-correlation integral kernels. Results will be presented on zero pressure using both the Hedin-Lundquist local density approximation (LDA) model or the Perdew-Wang generalized gradient approximation (GGA) model. Possibilities of different characterizations of PuO{sub 2} will be explored. The paper ''Chemical Characterization Rocky Flats and Los Alamos Plutonium-Containing Incinerator Ash'' describes the results of a comprehensive study of the chemical characteristics of virgin, calcined and fluorinated incinerator ash produced at the Rocky Flats Plant and at the Los Alamos National Laboratory prior to 1988. The Rocky Flats and Los Alamos virgin, calcined, and fluorinated ashes were also dissolved using standard nitrate dissolution chemistry. Corresponding chemical evaluations were preformed on the resultant ash heel and the results compared with those of the virgin ash. Fluorination studies using FT spectroscopy as a diagnostic tool were also performed to evaluate the chemistry of phosphorus, sulfur, carbon, and silicon containing species in the ash. The distribution of plutonium and other chemical elements with the virgin ash, ash heel, fluorinated ash, and fluorinated ash heel particulates were studied in detail using microprobe analysis. Some of the more interesting results of these investigations are presented.

Ray, A.K.; Boettger, J.C.; Behrens, Robert G.

1999-11-29T23:59:59.000Z

244

HOW THE ROCKY FLATS ENVIRONMENTAL TECHNOLOGY SITE DEVELOPED A NEW WASTE PACKAGE USING A POLYUREA COATING THAT IS SAFELY AND ECONOMICALLY ELIMINATING SIZE REDUCTION OF LARGE ITEMS  

SciTech Connect

One of the major challenges involved in closing the Rocky Flats Environmental Technology Site (RFETS) is the disposal of extremely large pieces of contaminated production equipment and building debris. Past practice has been to size reduce the equipment into pieces small enough to fit into approved, standard waste containers. Size reducing this equipment is extremely expensive, and exposes workers to high-risk tasks, including significant industrial, chemical, and radiological hazards. RFETS has developed a waste package using a Polyurea coating for shipping large contaminated objects. The cost and schedule savings have been significant.

Dorr, Kent A.; Hogue, Richard S.; Kimokeo, Margaret K.

2003-02-27T23:59:59.000Z

245

Cleanup levels for Am-241, Pu-239, U-234, U-235 & U-238 in soils at the Rocky Flats Environmental Technology Site  

SciTech Connect

This presentation briefly outlines a cleanup program at a Rocky Flats site through viewgraphs and an executive summary. Exposure pathway analyses to be performed are identified, and decontamination levels are listed for open space and office worker exposure areas. The executive summary very briefly describes the technical approach, RESRAD computer code to be used for analyses, recommendations for exposure levels, and application of action levels to multiple radionuclide contamination. Determination of action levels for surface and subsurface soils, based on radiation doses, is discussed. 1 tab.

Roberts, R.; Colby, B.; Brooks, L.; Slaten, S.

1997-07-03T23:59:59.000Z

246

The Department of Energy`s Rocky Flats Plant: A guide to record series useful for health-related research. Volume I, introduction  

SciTech Connect

This guide consists of seven volumes which describe records useful for conducting health-related research at the DOE`s Rocky Flats Plant. Volume I is an introduction, and the remaining six volumes are arranged by the following categories: administrative and general, facilities and equipment, production and materials handling, waste management, workplace and environmental monitoring, and employee occupational exposure and health. Volume I briefly describes the Epidemiologic Records Project and provides information on the methodology used to inventory and describe the records series contained in subsequent volumes. Volume II describes records concerning administrative functions and general information. Volume III describes records series relating to the construction and routine maintenance of plant buildings and the purchase and installation of equipment. Volume IV describes records pertaining to the inventory and production of nuclear materials and weapon components. Records series include materials inventories, manufacturing specifications, engineering orders, transfer and shipment records, and War Reserve Bomb Books. Volume V describes records series pertaining to the storage, handling, treatment, and disposal of radioactive, chemical, or mixed materials produced or used at Rocky Flats. Volume VI describes records series pertaining to monitoring of the workplace and of the environment outside of buildings onsite and offsite. Volume VII describes records series pertaining to the health and occupational exposures of employees and visitors.

NONE

1995-08-01T23:59:59.000Z

247

Integrating Volume Reduction and Packaging Alternatives to Achieve Cost Savings for Low Level Waste Disposal at the Rocky Flats Environmental Technology Site  

SciTech Connect

In order to reduce costs and achieve schedules for Closure of the Rocky Flats Environmental Technology Site (RFETS), the Waste Requirements Group has implemented a number of cost saving initiatives aimed at integrating waste volume reduction with the selection of compliant waste packaging methods for the disposal of RFETS low level radioactive waste (LLW). Waste Guidance Inventory and Shipping Forecasts indicate that over 200,000 m3 of low level waste will be shipped offsite between FY2002 and FY2006. Current projections indicate that the majority of this waste will be shipped offsite in an estimated 40,000 55-gallon drums, 10,000 metal and plywood boxes, and 5000 cargo containers. Currently, the projected cost for packaging, shipment, and disposal adds up to $80 million. With these waste volume and cost projections, the need for more efficient and cost effective packaging and transportation options were apparent in order to reduce costs and achieve future Site packaging a nd transportation needs. This paper presents some of the cost saving initiatives being implemented for waste packaging at the Rocky Flats Environmental Technology Site (the Site). There are many options for either volume reduction or alternative packaging. Each building and/or project may indicate different preferences and/or combinations of options.

Church, A.; Gordon, J.; Montrose, J. K.

2002-02-26T23:59:59.000Z

248

DOE/EIS-0026-SA-03: Supplement Analysis for The Disposal of Certain Rocky Flats Plutonium-Bearing Materials at the Waste Isolation Pilot Plant (11/08/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supplement Analysis For Disposal of Certain Rocky Flats Supplement Analysis For Disposal of Certain Rocky Flats Plutonium-Bearing Materials at the Waste Isolation Pilot Plant PURPOSE The U.S. Department of Energy (DOE) is proposing to revise its approach for managing approximately 0.97 metric tons (MT) of plutonium-bearing materials (containing about 0.18 MT of surplus plutonium) located at the Rocky Flats Environmental Technology Site (RFETS). DOE is proposing to repackage and transport these materials for direct disposal at the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico. Several DOE environmental impact statements (EISs) discuss the potential impacts from different proposed alternatives for the storage and disposition of surplus plutonium and waste containing surplus plutonium. These EISs evaluated and presented the potential impacts for

249

Analysis of resuspension source area impacts at Rocky Flats surveillance air samplers S-7 and S-8, July 25-August 25, 1983 and September 8-October 4, 1983  

SciTech Connect

An on-going study at the Rocky Flats Plant is being used to evaluate resuspension source area contributions to Pu-239 concentrations at 2 of the samplers in the Plants air sampling network. Early results from the study indicate that Pu-239 concentration levels are being affected primarily by resuspension from a zone 150 meters east and west of the study samplers. Initial results have also shown that net transport of Pu-239 during the sampling period has been from the east toward the west, onto the plant proper. These early findings show that sources immediately east of the 2 samplers are responsible for most of the Pu-239 exposure at the samplers. 2 references, 1 figure, 4 tables.

Hammer, R.J.

1984-01-01T23:59:59.000Z

250

The Influence of Canyon Winds on Flow Fields near Colorado's Front Range  

Science Journals Connector (OSTI)

A network of sodars was operated in the late summer and fall of 1993 to monitor the occurrence of nocturnal winds from a canyon in Colorado's Front Range near the Rocky Flats Plant and to determine the influence of those winds on the flow fields ...

J. C. Doran

1996-04-01T23:59:59.000Z

251

A process for evaluation and state approval of an emergency response atmospheric dispersion model for Rocky Flats, Colorado  

SciTech Connect

This document contains copies of the vugraphs used by C. R. Hodgin for the November 6, 1991 presentation summarizing the process to be used for evaluation of the Emergency Response Dispersion Model. (MHB)

Hodgin, C.R.

1991-11-06T23:59:59.000Z

252

E-Print Network 3.0 - annual rocky mountain Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

system occurs on dry... , and extends out onto breaks in the Great Plains. In Colorado, the southern Rocky ... Source: Colorado State University, Center for Environmental...

253

The utility of a geographic information system in facility/land use-related opportunities and constraints analysis for the Rocky Flats Environmental Technology Site  

SciTech Connect

Facility/land use-related opportunities and constraints analysis, which is indispensable for the evaluation of potential future uses for a site, is essentially spatial in nature. Spatial analysis is best accomplished using a geographic information system (GIS), as a GIS allows the identification and reporting or mapping of complex relationships among multiple data layers such as geology, soils, vegetation, contamination, and facilities. GIS-based maps and reports are valuable tools for communicating facility/land use-related opportunities and constraints to decision makers. This paper defines the term {open_quotes}GIS,{close_quotes}, provides an example of how a GIS could be used to conduct opportunities and constraints analysis at the Rocky Flats Environmental Technology Site (RFETS), and summarizes the benefits of using a GIS for this analysis. Because a GIS is often seen as a {open_quotes}black box{close_quotes} shrouded in technical jargon, this paper attempts to describe the concepts and benefits of a GIS in language understandable to decision makers who are not GIS experts but who migth profit from the use of GIS products. The purpose of this paper is to alert DOE decision makers to a valuable source of facility/land use-related information that already exists at many sites and that should not be overlook during the analysis of future use options.

Stewart, J. [S.M. Stoller Corp., Boulder, CO (United States)

1994-12-31T23:59:59.000Z

254

Department of Energy Awards $300,000 Block Grant to the Rocky...  

Energy Savers (EERE)

300,000 Block Grant to the Rocky Flats Community Reuse Organization Department of Energy Awards 300,000 Block Grant to the Rocky Flats Community Reuse Organization Department of...

255

Colorado | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 1, 2010 June 1, 2010 CX-003021: Categorical Exclusion Determination Structure Replacements and Reconductor Black Hollow to Ault Transmission Line, Weld County, Colorado CX(s) Applied: B4.6 Date: 06/01/2010 Location(s): Weld County, Colorado Office(s): Western Area Power Administration-Rocky Mountain Region May 25, 2010 CX-002446: Categorical Exclusion Determination Green Mountain Switchyard Stage 06 Spring 2010 CX(s) Applied: B4.6, B4.11 Date: 05/25/2010 Location(s): Colorado Office(s): Western Area Power Administration-Rocky Mountain Region May 17, 2010 CX-002582: Categorical Exclusion Determination Colorado-City-Thornton CX(s) Applied: B2.5, A9, A11, B5.1 Date: 05/17/2010 Location(s): Thornton, Colorado Office(s): Energy Efficiency and Renewable Energy May 13, 2010 CX-002241: Categorical Exclusion Determination

256

Evidence of rocky planetesimals orbiting two Hyades stars  

Science Journals Connector (OSTI)

......material that is consistent with rocky planetary debris around two...calculated in the relatively flat region between 1310 and 1330a...thus provide insight on the rocky planetary systems they construct...chondritic meteorites and thus rocky. In contrast, planetary debris......

J. Farihi; B. T. Gnsicke; D. Koester

2013-01-01T23:59:59.000Z

257

Colorado's 2nd congressional district: Energy Resources | Open Energy  

Open Energy Info (EERE)

Colorado. Colorado. Contents 1 Registered Research Institutions in Colorado's 2nd congressional district 2 Registered Networking Organizations in Colorado's 2nd congressional district 3 Registered Policy Organizations in Colorado's 2nd congressional district 4 Registered Energy Companies in Colorado's 2nd congressional district 5 Registered Financial Organizations in Colorado's 2nd congressional district 6 Energy Incentives for Colorado's 2nd congressional district Registered Research Institutions in Colorado's 2nd congressional district National Wind Technology Center Rocky Mountain Institute University of Colorado at Boulder Renewable and Sustainable Energy Institute Registered Networking Organizations in Colorado's 2nd congressional district American Solar Energy Society

258

Preliminary Notice of Violation, Rocky Mountain Remediation Services -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rocky Mountain Remediation Rocky Mountain Remediation Services - EA-97-04 Preliminary Notice of Violation, Rocky Mountain Remediation Services - EA-97-04 June 6, 1997 Preliminary Notice of Violation issued to Rocky Mountain Remediation Services related to a Radioactive Material Release during Trench Remediation at the Rocky Flats Environmental Technology Site, (EA-97-04) This letter refers to the Department of Energy's (DOE) evaluation of noncompliances associated with the dispersal of radioactive material during the remediation of trenches. Preliminary Notice of Violation, Rocky Mountain Remediation Services - EA-97-04 More Documents & Publications Preliminary Notice of Violation, Kaiser-Hill Company - EA-97-03 Consent Order, Kaiser-Hill Company, LLC - EA 98-03 Preliminary Notice of Violation , Rocky Flats Environmental Technology Site

259

Enclosure 1 -CCP-AK-INL-004, Table 5-2 (1 page) Table 5-2. Isotopic Compositions of Rocky Flats Plutonium and Uranium  

E-Print Network (OSTI)

Flats Plutonium and Uranium Weapons-Grade Plutonium Enriched Uranium Depleted Uranium Plutonium-238 0.01 ­ 0.05% Uranium-234 0.1 ­ 1.02% Uranium-234 0.0006% Plutonium-239 92.8 ­ 94.4% Uranium-235 90 ­ 94% Uranium-235 0.2 ­ 0.3% Plutonium-240 4.85 ­ 6.5% Uranium-236 0.4 ­ 0.5% Uranium-238 99.7 ­ 99.8% Plutonium

260

Preliminary Notice of Violation, Rocky Mountain Remediation Services- EA-97-04  

Energy.gov (U.S. Department of Energy (DOE))

Preliminary Notice of Violation issued to Rocky Mountain Remediation Services related to a Radioactive Material Release during Trench Remediation at the Rocky Flats Environmental Technology Site, (EA-97-04)

Note: This page contains sample records for the topic "rocky flats colorado" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

2 VARIABILITY OF ENVIRONMENTAL RADIOACTIVITY AND RADIATION  

Science Journals Connector (OSTI)

......Doctor (1985) 241Am Grassland, Rocky Flats, Colorado, USA 104 0.13-1...1992) 239,240Pu Grassland, Rocky Flats, Colorado 104 0.25-1.38...densities in soil samples near Rocky Flats, Colorado, USA, varied from......

2 VARIABILITY OF ENVIRONMENTAL RADIOACTIVITY AND RADIATION

2006-06-01T23:59:59.000Z

262

Refuel Colorado  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and the Colorado Hydrogen Coalition Colorado Energy Office | www.colorado.govenergy Refuel Colorado - Alt Fuel Market Expansion Potential 11 Remaining Project...

263

Microsoft Word - Rockies Pipelines and Prices.doc  

Gasoline and Diesel Fuel Update (EIA)

07 07 1 September 2007 Short-Term Energy Outlook Supplement: Natural Gas in the Rocky Mountains: Developing Infrastructure 1 Highlights * Recent natural gas spot market volatility in the Rocky Mountain States of Colorado, Utah, and Wyoming has been the result of increased production while consumption and pipeline export capacity have remained limited. This Supplement analyzes current natural gas production, pipeline and storage infrastructure in the Rocky Mountains, as well as prospective pipeline projects in these States. * Natural gas reserves in the Rocky Mountain States account for nearly 22 percent of the total natural gas reserves in the United States, and are

264

Oregon's Rocky Shore Species: Anemones Giant Green Anemones get their bright coloration from symbiotic, single-celled  

E-Print Network (OSTI)

(right) and grow flat. Photos: Laurel Hillmann #12;Oregon's Rocky Shore Species: Molluscs & ArthropodsOregon's Rocky Shore Species: Anemones Giant Green Anemones get their bright coloration from;Oregon's Rocky Shore Species: Sea Stars Rocky shores are home to a diverse group of species including

Wright, Dawn Jeannine

265

EA-1747: Finding of No Significant Impact | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

of No Significant Impact Rocky Flats Surface Water Configuration, Jefferson County, Colorado Surface Water Configuration Project at the Rocky Flats Site, Colorado...

266

Domestic campsites and cyber landscapes in the Rocky Mountains  

E-Print Network (OSTI)

Domestic campsites and cyber landscapes in the Rocky Mountains Laura L. Scheiber1 & Judson Byrd, Central Rocky Mountains, GIS, GPS, stone circles, architecture, multi-scalar, households, technology, tipis, horses and wagons occupying a flat clearing along a valley floor c. 1907. Photograph by Richard

Scheiber, Laura L.

267

Colorado | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

16, 2010 16, 2010 CX-001709: Categorical Exclusion Determination Application Titled: Integration of Noise and Coda Correlation Data CX(s) Applied: A9 Date: 04/16/2010 Location(s): Colorado Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 15, 2010 CX-001652: Categorical Exclusion Determination Structure Replacement Hayden-Gore Pass 138 Kilovolt Transmission Line (Structure 25/5) Spring 2010 CX(s) Applied: B4.6 Date: 04/15/2010 Location(s): Colorado Office(s): Western Area Power Administration-Rocky Mountain Region April 15, 2010 CX-001631: Categorical Exclusion Determination Install Wells and Boreholes at the Old Rifle Colorado Processing Site CX(s) Applied: B3.1 Date: 04/15/2010 Location(s): Old Rifle, Colorado Office(s): Legacy Management April 12, 2010

268

Colorado | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

20, 2011 20, 2011 Colorado Start-Up Awarded First 'America's Next Top Energy Innovator' Agreement Colorado start-up U.S. e-Chromic becomes the first company to sign a patent agreement as part of the "America's Next Top Energy Innovator" challenge. May 20, 2011 Vice President Biden Visits National Renewable Energy Laboratory, Announces First Agreement Under "America's Next Top Energy Innovator" Challenge Outlines Administration's Ongoing Commitment to Spur Commercialization of Technology May 19, 2011 CX-005981: Categorical Exclusion Determination Curecanti Substation Containment Wall, Montrose County, Colorado CX(s) Applied: B1.6 Date: 05/19/2011 Location(s): Montrose County, Colorado Office(s): Western Area Power Administration-Rocky Mountain Region

269

Colorado | OpenEI  

Open Energy Info (EERE)

Colorado Colorado Dataset Summary Description Description: a database from Southern Methodist University (SMU) of over 5000 wells in primarily high temperature geothermal areas from the Rockies to the Pacific Ocean; all wells within a geothermal area are located where available; the majority of the data are from company documents, well logs and publications. Many of the wells were not previously accessible to the public. Source SMU Date Released Unknown Date Updated Unknown Keywords Colorado geothermal SMU Data application/vnd.ms-excel icon Colorado Geothermal Data 2008 (xls, 101.9 KiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Time Period 1960-2008 License License Open Data Commons Public Domain Dedication and Licence (PDDL)

270

Preliminary Notice of Violation, Rocky Mountain Remediation Services...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Services related to a Radioactive Material Release during Trench Remediation at the Rocky Flats Environmental Technology Site, (EA-97-04) On June 6, 1997, the U.S. Department...

271

A Seismic Refraction Survey in the Northern Rocky Mountains: More Evidence for an Intermediate Crustal Layer  

Science Journals Connector (OSTI)

......from the P,,arrivals of the Rocky Mountain profile. The observations...sistent with those for the Rocky Mountain profile. The amplitudesof...decrease as sharply as on the Rocky Mountain profile, but in this...sediments is 3kms-' and using flat earth theory, the thicknesses......

A. L. Hales; J. B. Nation

1973-12-01T23:59:59.000Z

272

Immobilization of Rocky Flats Graphite Fines Residue  

SciTech Connect

The development of the immobilization process for graphite fines has proceeded through a series of experimental programs. The experimental procedures and results from each series of experiments are discussed in this report.

Rudisill, T.S.

1999-04-06T23:59:59.000Z

273

Risk, Media, and Stigma at Rocky Flats  

Science Journals Connector (OSTI)

Public responses to nuclear technologies are often strongly negative. Events, such as accidents or evidence of unsafe conditions at nuclear facilities, receive extensive and dramatic coverage by the news media. T...

James Flynn; Ellen Peters; C. K. Mertz; Paul Slovic

1998-12-01T23:59:59.000Z

274

Rocky Mountain Institute | Open Energy Information  

Open Energy Info (EERE)

Institute Institute Jump to: navigation, search Logo: Rocky Mountain Institute Name Rocky Mountain Institute Address 1820 Folsom Street Place Boulder, Colorado Zip 80302 Region Rockies Area Coordinates 40.01838°, -105.262323° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.01838,"lon":-105.262323,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

275

Biogeochemical behaviour of plutonium during anoxic biostimulation of contaminated sediments  

Science Journals Connector (OSTI)

...Science-based cleanup of Rocky Flats. Physics Today , 59...the transuranic element neptunium. Environmental Science...solid phases in soils of Rocky Flats, Colorado, using sequential...radionuclides in the soils of Rocky Flats, Colorado. Journal...

R. L. Kimber; C. Boothman; P. Purdie; F. R. Livens; J. R. Lloyd

276

DOE - Office of Legacy Management -- Rocky Mountain Research Laboratories -  

Office of Legacy Management (LM)

Rocky Mountain Research Rocky Mountain Research Laboratories - CO 06 FUSRAP Considered Sites Site: ROCKY MOUNTAIN RESEARCH LABORATORIES (CO.06 ) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: 1020 Yuma Street , Denver , Colorado CO.06-1 Evaluation Year: Circa 1987 CO.06-3 Site Operations: Processed beryllium on a pilot scale. CO.06-1 Site Disposition: Eliminated - No indication of radioactive materials handled at the site CO.06-2 Radioactive Materials Handled: No Primary Radioactive Materials Handled: None Radiological Survey(s): None Indicated Site Status: Eliminated from further consideration under FUSRAP CO.06-2 Also see Documents Related to ROCKY MOUNTAIN RESEARCH LABORATORIES CO.06-1 - Rocky Mountain Research Letter; Burton to Smith; Subject:

277

Rockies Area | Open Energy Information  

Open Energy Info (EERE)

Rockies Area Rockies Area Jump to: navigation, search Contents 1 Clean Energy Clusters in the Rockies Area 1.1 Products and Services in the Rockies Area 1.2 Research and Development Institutions in the Rockies Area 1.3 Networking Organizations in the Rockies Area 1.4 Investors and Financial Organizations in the Rockies Area 1.5 Policy Organizations in the Rockies Area Clean Energy Clusters in the Rockies Area Products and Services in the Rockies Area Loading map... {"format":"googlemaps3","type":"ROADMAP","types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"limit":500,"offset":0,"link":"all","sort":[""],"order":[],"headers":"show","mainlabel":"","intro":"","outro":"","searchlabel":"\u2026

278

Colorado School of Mines - Colorado Energy Research Institute | Open Energy  

Open Energy Info (EERE)

School of Mines - Colorado Energy Research Institute School of Mines - Colorado Energy Research Institute Jump to: navigation, search Name Colorado School of Mines - Colorado Energy Research Institute Address 1500 Illinois Street Place Golden, Colorado Zip 80401 Region Rockies Area Coordinates 39.751116°, -105.222315° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.751116,"lon":-105.222315,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

279

GROUPS SENSITIVITY SCORE Flat worms 3  

E-Print Network (OSTI)

GROUPS SENSITIVITY SCORE Flat worms 3 Worms 3 Leeches 2 Crabs or shrimps 7 Stoneflies 14 Minnow The best sites are those with rocks in moving water. Not all sites have rocks (rocky type rivers), but may rocky, sandy, and vegetation habitats, not all habitats are always present at a site. If your river does

de Villiers, Marienne

280

Colorado | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 9, 2011 June 9, 2011 EA-1770: Final Environmental Assessment Photovoltaic Solar Project at the Durango, Colorado, Disposal Site, La Plata County June 9, 2011 EA-1770: Finding of No Significant Impact Photovoltaic Solar Project at the Durango, Colorado Site June 4, 2011 CX-005942: Categorical Exclusion Determination Characterization of Most Promising Sequestration Formations in the Rocky Mountain Region - Drilling/Coring Actions CX(s) Applied: B3.1, B3.8 Date: 06/04/2011 Location(s): Craig, Colorado Office(s): Fossil Energy, National Energy Technology Laboratory June 3, 2011 Moab Mill Tailings Pile 25 Percent Disposed: DOE Moab Project Reaches Significant Milestone Grand Junction, CO - One quarter of the uranium mill tailings pile located in Moab, Utah, has been relocated to the Crescent Junction, Utah,

Note: This page contains sample records for the topic "rocky flats colorado" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Water chemistry of high elevation Colorado wilderness lakes  

Science Journals Connector (OSTI)

High elevation alpine and subalpine Rocky Mountain lakes in Colorado and southeastern Wyoming were examined to determine ... of the state. In contrast the north-western most lakes are significantly more dilute th...

Robert C. Musselman; William L. Slauson

2004-12-01T23:59:59.000Z

282

COLORADO GOLDEN FIELD OFFICE POC Karen Downs Telephone  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TRANSPORTATION & WAREHOUSING TRANSPORTATION & WAREHOUSING COLORADO GOLDEN FIELD OFFICE POC Karen Downs Telephone (720) 356-1269 Email karen.downs@go.doe.gov Other Support Activities for Air Transportation 488190 Freight Transportation Arrangement 488510 General Warehousing and Storage 493110 NATIONAL RENEWABLE ENERGY LAB POC Nancy Gardner Telephone (303) 384-7335 Email nancy.gardner@nrel.gov Specialized Freight (except Used Goods) Trucking, Local 484220 ROCKY FLATS POC Telephone Email Specialized Freight (except Used Goods) Trucking, Long-Distance 484230 WESTERN POWER ADMIN POC Cheryl Drake Telephone (720) 962-7154 Email drake@wapa.gov General Freight Trucking, Local 484110 General Freight Trucking, Long-Distance, Truckload 484121 Specialized Freight (except Used Goods) Trucking, Local 484220 Specialized Freight (except Used Goods) Trucking, Long-Distance

283

Colorado's 3rd congressional district: Energy Resources | Open Energy  

Open Energy Info (EERE)

3rd congressional district 3rd congressional district 2 Registered Networking Organizations in Colorado's 3rd congressional district 3 Registered Policy Organizations in Colorado's 3rd congressional district 4 Registered Energy Companies in Colorado's 3rd congressional district 5 Energy Incentives for Colorado's 3rd congressional district 6 Utility Companies in Colorado's 3rd congressional district US Recovery Act Smart Grid Projects in Colorado's 3rd congressional district Black Hills/Colorado Electric Utility Co. Smart Grid Project Registered Networking Organizations in Colorado's 3rd congressional district Haiti Repowered Peak Oil Awareness Network Peak Oil Food Network Registered Policy Organizations in Colorado's 3rd congressional district Sustainability Center of the Rockies Registered Energy Companies in Colorado's 3rd congressional district

284

COTTONWOOD AS A CROP IN COLORADO* Greeley, Colorado -October 4, 1978  

E-Print Network (OSTI)

Crouch, Principal Wildlife Biologist, employed by the Rocky Mountain Forest and Range Experiment Station single file on seven groaning flat cars~ Soon they would begin their trek across the Kansas flatlands

285

Colorado | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

27, 2010 27, 2010 Blue flame generated by natural gas. Geek-Up[08.27.10] -- Geothermal Stores, Graphene Loops, Nozzle Technology and the 1918 El Niño What does Ikea, a redesigned nozzle, graphene and El Niño have to do with each other? They are all featured in this edition of Geek Up! August 24, 2010 CX-003511: Categorical Exclusion Determination Modernization of Boulder Canyon Hydroelectric Project CX(s) Applied: B5.1 Date: 08/24/2010 Location(s): Boulder, Colorado Office(s): Energy Efficiency and Renewable Energy, Golden Field Office August 23, 2010 CX-003621: Categorical Exclusion Determination Hayden Substation Transformer Replacement CX(s) Applied: B4.6 Date: 08/23/2010 Location(s): Routt County, Colorado Office(s): Western Area Power Administration-Rocky Mountain Region

286

Colorado | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 22, 2010 October 22, 2010 Geek-Up[10.22.2010]: Exploring the CAVE, Electrical Links to Living Cells, and Energy Execs At Idaho National Laboratory, engineers are walking into the core of nuclear reactors and rappelling down cliffs, all without ever leaving the office. October 21, 2010 CX-004299: Categorical Exclusion Determination Tree Cutting Cheyenne Field Office Maintenance Area CX(s) Applied: B1.3 Date: 10/21/2010 Location(s): Larimer, Colorado Office(s): Western Area Power Administration-Rocky Mountain Region October 20, 2010 CX-004268: Categorical Exclusion Determination Scale-Up of Hydrogen Transport Membranes CX(s) Applied: B3.6 Date: 10/20/2010 Location(s): Boulder, Colorado Office(s): Fossil Energy, National Energy Technology Laboratory October 5, 2010 Fostering a New Generation of Geothermal Workers

287

Colorado | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 11, 2009 December 11, 2009 CX-002604: Categorical Exclusion Determination Characterization of Most Promising Carbon Capture and Sequestration Formations in the Central Rocky Mountain Region CX(s) Applied: A9, A11 Date: 12/11/2009 Location(s): Denver, Colorado Office(s): Fossil Energy, National Energy Technology Laboratory December 11, 2009 CX-000294: Categorical Exclusion Determination A Novel Biogas Desulphurization Sorbent Technology for Molten Carbonate Fuel Cell- Based Combined Heat and Power Systems CX(s) Applied: B3.6 Date: 12/11/2009 Location(s): Golden, Colorado Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory December 10, 2009 CX-000292: Categorical Exclusion Determination A Novel Biogas Desulphurization Sorbent Technology for Molten Carbonate

288

Colorado | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 8, 2011 April 8, 2011 CX-005551: Categorical Exclusion Determination Field Test Laboratory Building 158-03 Install Condensing Unit CX(s) Applied: B1.4, B1.16 Date: 04/08/2011 Location(s): Golden, Colorado Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 7, 2011 CX-005687: Categorical Exclusion Determination Tree Cutting Cheyenne Field Office Maintenance Area, Spring 2011 CX(s) Applied: B1.3 Date: 04/07/2011 Location(s): Larimer, Colorado Office(s): Western Area Power Administration-Rocky Mountain Region March 31, 2011 Scientist Kirsten Orwig 10 Questions for a Wind & Solar Integration Analyst: Kirsten Orwig Kirsten Orwig shares how her experiences in storm chasing led her to this position at National Renewable Energy Laboratory (NREL) and why

289

Southern Colorado Plateau Geothermal Region | Open Energy Information  

Open Energy Info (EERE)

Southern Colorado Plateau Geothermal Region Southern Colorado Plateau Geothermal Region Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Southern Colorado Plateau Geothermal Region Details Areas (0) Power Plants (0) Projects (0) Techniques (0) Map: {{{Name}}} "The Colorado Plateau is a high standing crustal block of relatively undeformed rocks surrounded by the highly deformed Rocky Mountains, and Basin and Range Provinces. The Uinta Mountains of Utah and Rocky Mountains of Colorado define the northern and northeastern boundaries of the Plateau. The Rio Grande Rift Valley in New Mexico defines the eastern boundary. The southern boundary is marked by the Mogollon Rim, an erosional cuesta that separates the Colorado Plateau from the extensively faulted Basin and Rang Province. To the west is a broad transition zone where the geologic

290

"2. Craig","Coal","Tri-State G & T Assn, Inc",1304 "3. Fort St Vrain","Gas","Public Service Co of Colorado",969  

U.S. Energy Information Administration (EIA) Indexed Site

Colorado" Colorado" "1. Comanche","Coal","Public Service Co of Colorado",1426 "2. Craig","Coal","Tri-State G & T Assn, Inc",1304 "3. Fort St Vrain","Gas","Public Service Co of Colorado",969 "4. Cherokee","Coal","Public Service Co of Colorado",717 "5. Rawhide","Coal","Platte River Power Authority",666 "6. Rocky Mountain Energy Center","Gas","Rocky Mountain Energy Ctr LLC",601 "7. Pawnee","Coal","Public Service Co of Colorado",505 "8. Front Range Power Project","Gas","Colorado Springs City of",462 "9. Hayden","Coal","Public Service Co of Colorado",446

291

Rockies | OpenEI  

Open Energy Info (EERE)

Rockies Rockies Dataset Summary Description This dataset comes from the Energy Information Administration (EIA), and is part of the 2011 Annual Energy Outlook Report (AEO2011). This dataset is table 94, and contains only the reference case. The data is broken down into electric power sector, cumulative planned additions,cumulative unplanned additions,cumulative retirements, end-use sector, electricity sales, net energy for load, generation by fuel type and price by service category. Source EIA Date Released April 26th, 2011 (3 years ago) Date Updated Unknown Keywords 2011 AEO EIA Electric Power projections Rockies Data application/vnd.ms-excel icon AEO2011: Electric Power Projections for EMM Region - Western Electricity Coordinating Council / Rockies- Reference Case (xls, 258.8 KiB)

292

Colorado beetle  

Science Journals Connector (OSTI)

The Colorado beetle (Leptinotarsa decemlineata...(Say)) is a serious pest of potato. It was first recorded in 1824 in the western USA feeding on a wild plant. However ... Act 1877. Britains first outbreak of Colorado

Marion Gratwick M.Sc; D.I.C.; C.Biol.; M.I.Biol.; F.R.E.S.

1992-01-01T23:59:59.000Z

293

Southern Rockies Geothermal Region | Open Energy Information  

Open Energy Info (EERE)

Southern Rockies Geothermal Region Southern Rockies Geothermal Region Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Southern Rockies Geothermal Region Details Areas (0) Power Plants (0) Projects (0) Techniques (0) Assessment of Moderate- and High-Temperature Geothermal Resources of the United States[1] References ↑ "Assessment of Moderate- and High-Temperature Geothermal Resources of the United States" Geothermal Region Data State(s) Colorado, New Mexico Area 128,454 km²128,454,000,000 m² 49,583.244 mi² 1,382,666,010,600 ft² 153,630,984,000 yd² 31,741,625.67 acres USGS Resource Estimate for this Region Identified Mean Potential 0 MW0 kW 0 W 0 mW 0 GW 0 TW Undiscovered Mean Potential 1,010 MW1,010,000 kW 1,010,000,000 W 1,010,000,000,000 mW 1.01 GW 0.00101 TW Planned Capacity

294

REFERENCES  

Science Journals Connector (OSTI)

......Soil around the Rocky Flats Plant. HASL-235...Commission, Health and Safety Laboratory: New...in soils around Rocky Flats, Colorado, Health...plutonium particles in Rocky Flats soil, Health Phys...on Radiological Safety in the Marshall......

REFERENCES

2006-06-01T23:59:59.000Z

295

Categorical Exclusion Determinations: Colorado | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 12, 2010 March 12, 2010 CX-006295: Categorical Exclusion Determination Colorado-County-Adams CX(s) Applied: A1, A9, A11, B1.32, B2.5, B3.6, B5.1 Date: 03/12/2010 Location(s): Adams County, Colorado Office(s): Energy Efficiency and Renewable Energy March 12, 2010 CX-002197: Categorical Exclusion Determination Ault Substation Expansion and Equipment Additions, Weld County, Colorado CX(s) Applied: B4.11 Date: 03/12/2010 Location(s): Weld County, Colorado Office(s): Western Area Power Administration-Rocky Mountain Region March 10, 2010 CX-001063: Categorical Exclusion Determination High-Temperature Circuit Boards for use in Geothermal Well Monitoring Applications Date: 03/10/2010 Location(s): Lafayette, Colorado Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

296

Categorical Exclusion Determinations: Colorado | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 18, 2012 May 18, 2012 CX-008766: Categorical Exclusion Determination Asphalt Repair and Concrete Work Activities at the Grand Junction, Colorado, Disposal Site CX(s) Applied: B1.3 Date: 05/18/2012 Location(s): Colorado Offices(s): Legacy Management May 15, 2012 CX-008238: Categorical Exclusion Determination Recovery Act: Colorado State Capitol Building Geothermal Program CX(s) Applied: A9, B2.1, B5.19 Date: 05/15/2012 Location(s): Colorado Offices(s): Golden Field Office May 9, 2012 CX-008401: Categorical Exclusion Determination Giant Track Communications Tower Removal CX(s) Applied: B1.19 Date: 05/09/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region May 9, 2012 CX-008381: Categorical Exclusion Determination Big Thompson to Flatiron 13.8 Kilovolt Transmission Line Structure

297

EA-1093: Surface Water Drainage System, Golden, Colorado  

Energy.gov (U.S. Department of Energy (DOE))

This EA evaluates the environmental impacts of the proposal to correct deficiencies in, and then to maintain, the surface water drainage system serving the U.S. Department of Energy's Rocky Flats...

298

Flat versus normal subduction zones: a comparison based on 3-D regional traveltime tomography and petrological modelling of central Chile and western Argentina (2935S)  

Science Journals Connector (OSTI)

......been linked to an ancient flat slab episode of the Farallon...the central Chilean flat subduction is considered a modern analogue of the Rocky Mountain Laramide Province...a modern analogue of Rocky Mountain foreland deformation...of the central Andean flat-slab between 30S and......

M. Marot; T. Monfret; M. Gerbault; G. Nolet; G. Ranalli; M. Pardo

2014-01-01T23:59:59.000Z

299

University of Colorado University of Colorado Boulder  

E-Print Network (OSTI)

University of Colorado Boulder University of Colorado Boulder University of Colorado Boulder University of Colorado Boulder University of Colorado Boulder Catalog 2012­13 Redefining Teaching & Learning­13 UNIVERSITY OF COLORADO BOULDER CATALOG contains a summary of campus offerings, policies, and requirements

Mojzsis, Stephen J.

300

Colorado Cleantech Industry Association | Open Energy Information  

Open Energy Info (EERE)

Industry Association Industry Association Jump to: navigation, search Logo: Colorado Cleantech Industry Association Name Colorado Cleantech Industry Association Address 1445 Market Street Place Denver, Colorado Zip 80202 Region Rockies Area Website http://www.coloradocleantech.c Notes CCIA is a new statewide organization dedicated to promoting Colorado's cleantech industry Coordinates 39.748929°, -105.000114° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.748929,"lon":-105.000114,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "rocky flats colorado" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

A Biodiversity Scorecard for Colorado Colorado Natural Heritage Program  

E-Print Network (OSTI)

A Biodiversity Scorecard for Colorado Colorado Natural Heritage Program and The Nature Conservancy Conservancy. 2008. A Biodiversity Scorecard for Colorado. Colorado Natural Heritage Program, Colorado State

302

U of L Calgary Campus-Friday, August 31, 2012 Parking Information for Rocky Mountain Plaza and Bow Valley College  

E-Print Network (OSTI)

U of L Calgary Campus- Friday, August 31, 2012 Parking Information for Rocky Mountain Plaza and Bow daytime hours. The flat rate costs are as follows: Monday to Friday (evenings): $3.00 Weekends & Holidays

Morris, Joy

303

Rocky Mountain Humane Investing | Open Energy Information  

Open Energy Info (EERE)

Humane Investing Humane Investing Jump to: navigation, search Name Rocky Mountain Humane Investing Place Allenspark, Colorado Zip 80510 Product Allenspark-based investment management firm prioritising Socially Responsible Investing (SRI). Coordinates 40.19472°, -105.525719° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.19472,"lon":-105.525719,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

304

Biogeochemical impacts of wildfires over four millennia in a Rocky Mountain subalpine watershed  

E-Print Network (OSTI)

Biogeochemical impacts of wildfires over four millennia in a Rocky Mountain subalpine watershed of Geography, University of Colorado at Denver, Denver, CO 80217-3364, USA Author for correspondence: Philip E forests. Summary Wildfires can significantly alter forest carbon (C) storage and nitrogen (N

305

Colorado State University Colorado State University  

E-Print Network (OSTI)

Colorado State University _______________ 1.1 Page 1 Colorado State University In 1870, the Territorial Council and House of Representatives of the Territory of Colorado created the Colorado that same year as Colorado's land-grant college under the Morrill Act of 1862. The Morrill Act provided

Stephens, Graeme L.

306

Colorado State University Colorado State University  

E-Print Network (OSTI)

Colorado State University Colorado State University In 1870, the Territorial Council and House of Representatives of the Territory of Colorado created the Colorado Agricultural College. When the Territory became. The College admitted its first students in 1879 and received designation that same year as Colorado's land

Collett Jr., Jeffrey L.

307

Rendezvous in the Rockies Pool & Spa Low Temperature Geothermal Facility |  

Open Energy Info (EERE)

Rendezvous in the Rockies Pool & Spa Low Temperature Geothermal Facility Rendezvous in the Rockies Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Rendezvous in the Rockies Pool & Spa Low Temperature Geothermal Facility Facility Rendezvous in the Rockies Sector Geothermal energy Type Pool and Spa Location Buena Vista, Colorado Coordinates 38.8422178°, -106.1311288° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

308

Sustainability Center of the Rockies | Open Energy Information  

Open Energy Info (EERE)

Sustainability Center of the Rockies Sustainability Center of the Rockies Jump to: navigation, search Name Sustainability Center of the Rockies Address Post Office Box 2020 Place Carbondale, Colorado Zip 81623 Region Rockies Area Notes Mission is to transform the Roaring Fork Valley's built environment into a model of resource-efficient living Website http://www.scor1.org/ Coordinates 39.397478°, -107.216685° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.397478,"lon":-107.216685,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

309

Hydraulic Fracturing Expert Team from Colorado State University Bill Ritter  

E-Print Network (OSTI)

issues associated with oil and gas exploration and production in Colorado and the Rocky Mountain region of technologies to reduce the environmental impact of oil and gas production and has developed a suite to sediments, including those that may produce natural gas and oil, when they are buried by natural processes

310

Colorado Community Readiness Efforts for PEVs Support State Policy Development  

Office of Energy Efficiency and Renewable Energy (EERE)

Project FEVER (Fostering Electric Vehicle Expansion in the Rockies), funded by EEREs Clean Cities plug-in electric vehicle community readiness award, has supported the development of Colorado state policies to accelerate the adoption of plug-in electric vehicles (PEVs).

311

Rocky Mountain White Tilapia Aquaculture Low Temperature Geothermal  

Open Energy Info (EERE)

Tilapia Aquaculture Low Temperature Geothermal Tilapia Aquaculture Low Temperature Geothermal Facility Jump to: navigation, search Name Rocky Mountain White Tilapia Aquaculture Low Temperature Geothermal Facility Facility Rocky Mountain White Tilapia Sector Geothermal energy Type Aquaculture Location Alamosa, Colorado Coordinates 37.4694491°, -105.8700214° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

312

Colorado Census Snapshot: 2010  

E-Print Network (OSTI)

Colorado Census Snapshot: 2010 Same-sex couples Same-sexThornton Longmont Northglenn Colorado Springs Fort Collins

Gates, Gary J.; Cooke, Abigail M.

2011-01-01T23:59:59.000Z

313

Colorado Bark Beetle Cooperative  

E-Print Network (OSTI)

altitude Lodgepole Pine forests on the western and northern slopes of ColoradoColorado ­ Initial countiesColorado Bark Beetle Cooperative Colorado Bark Beetle Cooperative A Place Based Collaborative of Land Management, National Park Service, Colorado State Forest Service, & Northwest Colorado Council

314

A lowstand epikarstic intertidal flat from the middle Silurian of Gotland, Sweden  

E-Print Network (OSTI)

flat and rocky shore to the knowledge of Silurian karst. It forms the unconform- able boundary betweenA lowstand epikarstic intertidal flat from the middle Silurian of Gotland, Sweden Mikael Calner of a karstic flat setting. Four microfacies with different stable isotopic signatures are recognised across

Calner, Mikael

315

Rocky Mountain Customers  

NLE Websites -- All DOE Office Websites (Extended Search)

RM Home About RM Contact RM Customers Environmental Review-NEPA Operations & Maintenance Planning & Projects Power Marketing Rates Rocky Mountain Region's Customer list Use the filters above the customer list to refine your search. Click the "Clear" to reset the list. Western's full list of customers is available on the Western's Customer Web page. Customer Name Customer Type State Region Project Arapahoe and Roosevelt National Forests Federal Agencies CO RM LAP Arkansas River Power Authority Municipalities CO RM/CRSP LAP/SLIP Burlington, City of Municipalities CO RM LAP Cheyenne Mountain Air Force Base Federal Agencies CO RM LAP Clay Center, City of Municipalities KS RM LAP Denver Water Board Municipalities CO RM LAP

316

Categorical Exclusion Determinations: Colorado | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 8, 2013 May 8, 2013 CX-010266: Categorical Exclusion Determination South Table Mountain Energy Systems Integration Facility Hydrogen Fueling Station CX(s) Applied: B1.15 Date: 05/08/2013 Location(s): Colorado Offices(s): Golden Field Office April 26, 2013 CX-010258: Categorical Exclusion Determination Bangladesh Meteorological Instrumentation Installation CX(s) Applied: A9 Date: 04/26/2013 Location(s): Colorado Offices(s): Golden Field Office April 26, 2013 CX-010111: Categorical Exclusion Determination Animas River Substation Site Drainage Remediation CX(s) Applied: B4.6 Date: 04/26/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region April 26, 2013 CX-010110: Categorical Exclusion Determination Hesperus-Montrose (Project No. 3) 345 Kilovolt (kV) Transmission Line and

317

Alliance for Sustainable Colorado | Open Energy Information  

Open Energy Info (EERE)

Logo: Alliance for Sustainable Colorado Name Alliance for Sustainable Colorado Address 1536 Wynkoop Street Place Denver, Colorado Zip 80202 Region Rockies Area Website http://www.sustainablecolorado Notes Mission of is to catalyze the shift to a truly sustainable world by fostering collaboration among nonprofits, businesses, governments, and academia Coordinates 39.751448°, -105.0014929° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.751448,"lon":-105.0014929,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

318

Colorado Renewable Energy Collaboratory | Open Energy Information  

Open Energy Info (EERE)

Collaboratory Collaboratory Jump to: navigation, search Logo: Colorado Renewable Energy Collaboratory Name Colorado Renewable Energy Collaboratory Address 410 17th Street, Suite 1400 Place Denver, Colorado Zip 80202 Region Rockies Area Year founded 2007 Phone number 303-376-2631 Coordinates 39.7441861°, -104.9884861° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.7441861,"lon":-104.9884861,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

319

Categorical Exclusion Determinations: Colorado | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 21, 2010 October 21, 2010 CX-004299: Categorical Exclusion Determination Tree Cutting Cheyenne Field Office Maintenance Area CX(s) Applied: B1.3 Date: 10/21/2010 Location(s): Larimer, Colorado Office(s): Western Area Power Administration-Rocky Mountain Region October 20, 2010 CX-004268: Categorical Exclusion Determination Scale-Up of Hydrogen Transport Membranes CX(s) Applied: B3.6 Date: 10/20/2010 Location(s): Boulder, Colorado Office(s): Fossil Energy, National Energy Technology Laboratory September 30, 2010 CX-004108: Categorical Exclusion Determination Green Oil: Carbon Dioxide Enhanced Oil Recovery for America?s Small Oil Producers CX(s) Applied: A9, B3.6 Date: 09/30/2010 Location(s): Lakewood, Colorado Office(s): Fossil Energy, National Energy Technology Laboratory

320

Colorado Renewable Energy Society | Open Energy Information  

Open Energy Info (EERE)

Renewable Energy Society Renewable Energy Society Name Colorado Renewable Energy Society Address PO Box 933 Place Golden, Colorado Zip 80402 Region Rockies Area Notes Works for the sensible adoption of cost-effective energy efficiency and renewable energy technologies by Colorado businesses and consumers. Website http://www.cres-energy.org/ Coordinates 39.7559°, -105.2207° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.7559,"lon":-105.2207,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "rocky flats colorado" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Photo of the Week: Rocky Flats Wildlife Refuge | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Competition. | Photo courtesy of Oak Ridge National Laboratory. Photo of the Week: I, Robot Olympics Solar Junction, in partnership with NREL, has developed solar cells that...

322

Supplement Analysis For Disposal of Certain Rocky Flats Plutonium...  

NLE Websites -- All DOE Office Websites (Extended Search)

than 20 years except as noted in Chapter III of DOE Guide 435.1-1 (DOE, 1999a). 2 DOE Order 474.1 requires taking certain steps or meeting certain conditions before nuclear...

323

Long-Term Surveillance and Maintenance at Rocky Flats: Early...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Protection at the Fernald Preserve and Weldon Spring Sites Monitoring the Performance of an Alternative Landfill Cover at the Monticello, Utah, Uranium Mill Tailings Disposal Site...

324

Rocky Mountain Sustainable Enterprises LLC | Open Energy Information  

Open Energy Info (EERE)

Enterprises LLC Enterprises LLC Jump to: navigation, search Name Rocky Mountain Sustainable Enterprises LLC Place Boulder, Colorado Zip 80302 Product Colorado-based biofuel producer, liquid waste recycler, and distributed resource consultancy. Coordinates 42.74962°, -109.714163° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.74962,"lon":-109.714163,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

325

ORGANISM-SEDIMENT RELATIONSHIPS ON A MODERN TIDAL FLAT, BODEGA HARBOR, CALIFORNIA  

E-Print Network (OSTI)

ORGANISM-SEDIMENT RELATIONSHIPS ON A MODERN TIDAL FLAT, BODEGA HARBOR, CALIFORNIA Thomas E. Ronan r e d from prevailing northwesterly winds by a rocky peninsula, Bodega Head, and a beach and dune

Farmer, Jack D.

326

EA-1292: On-site Treatment of Low Level Mixed Waste, Golden, Colorado  

Energy.gov (U.S. Department of Energy (DOE))

This EA evaluates the environmental impacts for the proposal to evaluate the proposed treatment of low level mixed waste at the U.S. Department of Energy's Rocky Flats Environmental Technology Site.

327

University of Colorado Boulder Colorado Springs Denver  

E-Print Network (OSTI)

University of Colorado Boulder · Colorado Springs · Denver Office of the Vice President for Academic Affairs and Research 1800 Grant Street, Suite 800 35 UCA Denver, Colorado 80203-1185 (303) 860 Diversity Report Prepared by the University of Colorado System Office of Institutional Research April 2009

Stowell, Michael

328

Role of competition and predation in determining habitat occupancy of Cerithiidae (Gastropoda: Prosobranchia) on the rocky, intertidal, Red Sea coasts of Sinai  

Science Journals Connector (OSTI)

Six cerithiid snail species occur on rocky intertidal flats along the Sinai coasts of the Red...Clypeomorus moniliferum, Cerithium caeruleum, C. scabridum, C. columna, Clypeomorus tuberculatum and Cerithium echin...

Y. Ayal; U. N. Safriel

329

COLORADO CLIMATE PREPAREDNESS PROJECT  

E-Print Network (OSTI)

COLORADO CLIMATE PREPAREDNESS PROJECT FINAL REPORT Prepared by the Western Water Assessment for the State of Colorado #12;#12;Authors Kristen Averyt University of Colorado Boulder, CU-NOAA Western Water of Colorado Boulder, CU-NOAA Western Water Assessment Roberta Klein University of Colorado Boulder

Neff, Jason

330

Census Snapshot: Colorado  

E-Print Network (OSTI)

COLORADO Adam P. Romero, Public Policy Fellow Clifford J.couples raising children in Colorado. We compare same-sex sex married couples in Colorado. 1 APRIL 2008 In many ways,

Romero, Adam P; Rosky, Clifford J; Badgett, M.V. Lee; Gates, Gary J

2008-01-01T23:59:59.000Z

331

Effects of Plug-In Hybrid Electric Vehicles on Ozone Concentrations in Colorado  

Science Journals Connector (OSTI)

Effects of Plug-In Hybrid Electric Vehicles on Ozone Concentrations in Colorado ... Changes in PM10 and PM2.5 concentrations in Colorado (and most areas of the western U.S. outside California) were negligible. ... The biogenic, area, and mobile source inventories were provided by the National Park Service (17) based on an updated version of the Western Regional Air Partnership (WRAP) inventories from 2002 used for the Rocky Mountain Atmospheric Nitrogen and Sulfur (RoMANS) study. ...

Gregory L. Brinkman; Paul Denholm; Michael P. Hannigan; Jana B. Milford

2010-07-15T23:59:59.000Z

332

Categorical Exclusion Determinations: Colorado | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 5, 2012 September 5, 2012 CX-009189: Categorical Exclusion Determination (0675-1594) Eaton Corporation - Predictive Battery Management for Commercial Hybrid Vehicles CX(s) Applied: B3.6 Date: 09/05/2012 Location(s): Michigan, Minnesota, Colorado Offices(s): Advanced Research Projects Agency-Energy August 31, 2012 CX-009227: Categorical Exclusion Determination Beaver Creek- Big Sandy 115 Kilovolt Transmission Line Structure Replacements - Last Chance Fire CX(s) Applied: B4.13 Date: 08/31/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region August 29, 2012 CX-008913: Categorical Exclusion Determination High Resolution 3D Laser Imaging for Inspection, Maintenance, Repair and Operations - Phase II CX(s) Applied: A9, B3.6 Date: 08/29/2012

333

EA-0995: Drum Storage Facility for Interim Storage of Materials Generated by Environmental Restoration Operations, Golden, Colorado  

Energy.gov (U.S. Department of Energy (DOE))

This EA evaluates the environmental impacts of the proposal to construct and operate a drum storage facility at the U.S. Department of Energy's Rocky Flats Environmental Technology Site in Golden,...

334

of Colorado's Special Issue  

E-Print Network (OSTI)

Report on the Health of Colorado's Forests Special Issue 2005 Aspen Forests #12;2005 Report on the Health of Colorado's Forests February 2006 The 2005 Report on the Health of Colorado's Forests highlights Colorado's central mountains. Both sections of the Report underscore the need to address forest management

335

EA-1611: Colorado Highlands Wind Project, Logan County, Colorado...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project, Logan County, Colorado EA-1611: Colorado Highlands Wind Project, Logan County, Colorado SUMMARY DOE's Western Area Power Administration prepared an EA in 2009 to assess...

336

Northern Colorado Clean Cities | Open Energy Information  

Open Energy Info (EERE)

Northern Colorado Clean Cities Northern Colorado Clean Cities Jump to: navigation, search Name Northern Colorado Clean Cities Address PO Box 759 Place Johnstown, Colorado Zip 80534 Region Rockies Area Number of employees 1-10 Year founded 1996 Phone number 970-689-4845 Notes Non-profit with members and mission to reduce petroleum use in the transportation sector through use of alternative fuels and other strategies, through collaborative partnerships, now! Coordinates 40.2895951°, -104.9155243° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.2895951,"lon":-104.9155243,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

337

ROCKY MOUNTAIN OILFIELD TESTING CENTER  

NLE Websites -- All DOE Office Websites (Extended Search)

ALLIED OIL & TOOL POWERJET SLOTTING TOOL ALLIED OIL & TOOL POWERJET SLOTTING TOOL JANUARY 10, 1996 FC9522 / 95DT3 ROCKY MOUNTAIN OILFIELD TESTING CENTER PROJECT TEST RESULTS ALLIED OIL & TOOL POWERJET SLOTTING TOOL Prepared for: INDUSTRY PUBLICATION Prepared by: RALPH SCHULTE RMOTC Project Engineer January 11, 1996 551103/9522:jb CONTENTS Page Summary .......................................................................................................................2 Introduction.....................................................................................................................2 Description of Operations...................................................................................................3 Figure 1 ..........................................................................................................5

338

Mapco's NGL Rocky Mountain pipeline  

SciTech Connect

The Rocky Mountain natural gas liquids (NGL) pipeline was born as a result of major producible gas finds in the Rocky Mountain area after gas deregulation. Gas discoveries in the overthurst area indicated considerable volumes of NGL would be available for transportation out of the area within the next 5 to 7 years. Mapco studied the need for a pipeline to the overthrust, but the volumes were not substantial at the time because there was little market and, consequently, little production for ethane. Since that time crude-based products for ethylene manufacture have become less competitive as a feed product on the world plastics market, and ethane demand has increased substantially. This change in the market has caused a major modification in the plans of the NGL producers and, consequently, the ethane content of the NGL stream for the overthrust area is expected to be 30% by volume at startup and is anticipated to be at 45% by 1985. These ethane volumes enhance the feasibility of the pipeline. The 1196-mile Rocky Mountain pipeline will be installed from the existing facility in W. Texas, near Seminole, to Rock Springs, Wyoming. A gathering system will connect the trunk line station to various plant locations. The pipeline development program calls for a capacity of 65,000 bpd by the end of 1981.

Isaacs, S.F.

1980-01-01T23:59:59.000Z

339

Transport and Dispersion in Complex Terrain  

Science Journals Connector (OSTI)

......recently along the mountain-plains interface near DOE's Rocky Flats Plant in Colorado. ASCOT meteorological experiments in January and February 1991 were coordinated with Rocky Flats tracer releases for airflow and dispersion model evaluations......

C.E. Elderkin; P.H. Gudiksen

1993-12-01T23:59:59.000Z

340

Fire and Forest History in Mixed-Conifer Forests of Southwest Colorado  

E-Print Network (OSTI)

Fire and Forest History in Mixed-Conifer Forests of Southwest Colorado Peter M. Brown, Rocky Creek (56 plots spanning ponderosa/dry mixed-conifer to subalpine forests) Bear Park (43 plots spanning wetBear Park (43 plots spanning wet mixed-conifer to subalpine forests). #12;Archuleta Mesa Brown, P

Note: This page contains sample records for the topic "rocky flats colorado" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Colorado Statewide Forest Resource Assessment  

E-Print Network (OSTI)

Colorado Statewide Forest Resource Assessment A Foundation for Strategic Discussion and Implementation of Forest Management in Colorado #12;Acknowledgements The Colorado State Forest Service (CSFS, for providing leadership and oversight throughout the development of Colorado's Statewide Forest Resource

342

City of Loveland, Colorado (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

Loveland, Colorado (Utility Company) Loveland, Colorado (Utility Company) Jump to: navigation, search Name City of Loveland Place Colorado Utility Id 11256 Utility Location Yes Ownership M NERC Location WECC NERC WECC Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes Activity Bundled Services Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Area Lighting Lighting Flat Rate, Bus Shelters Commercial Flat Rate, Signal Amplifiers Commercial Flat Rate, Sprinkler Commercial Interruptible 115 kV Transmission Voltage Industrial

343

,"Colorado Natural Gas Summary"  

U.S. Energy Information Administration (EIA) Indexed Site

1: Prices" "Sourcekey","N3050CO3","N3010CO3","N3020CO3","N3035CO3","N3045CO3" "Date","Natural Gas Citygate Price in Colorado (Dollars per Thousand Cubic Feet)","Colorado Price...

344

Baseline Rd. Colorado Ave.  

E-Print Network (OSTI)

Baseline Rd. Broadway Broadway Colorado Ave. Arapahoe Ave. Canyon Blvd. 28thSt. 9thSt. 6thSt. 13th Pearl St. Euclid FolsomSt. N Baseline Rd. Broadway Broadway Colorado Ave. Arapahoe Ave. Canyon Blvd. 28://www.banjobilly.com JUNE 12-13, 2009 JILA/CHEMISTRY & BIOCHEMISTRY, UNIVERSITY OF COLORADO, BOULDER A CELEBRATION OF 40

Lineberger, W. Carl

345

Programmatic Agreement for Colorado  

Energy.gov (U.S. Department of Energy (DOE))

U.S. Department of Energy (DOE), Energy Efficiency and Conservation Block Grant Program (EECBG), Weatherization Assistance Program (WAP), State Energy Plan (SEP), Colorado State Historic Preservation Office (SHPO), Colorado Governors Energy Office (GEO), historic preservation, Section 106 of the National Historic Preservation Act, National Register of Historic Places, National Historic Preservation Act (NHPA), Programmatic Agreement for Colorado.

346

ROCKY MOUNTAIN OILFIELD TESTING CENTER  

NLE Websites -- All DOE Office Websites (Extended Search)

SAM III PROJECT SAM III PROJECT Sandia National laboratories Prepared for: Project File Documentation Prepared by: MICHAEL J. TAYLOR Project Manager March 31, 1998 JO 850200 : FC 970009 ABSTRACT The Rocky Mountain Oilfield Testing Center (RMOTC) conducted a demonstration of the Surface Area Modulation Downhole Telemetry System (SAM 111) at the Department of Energy's Naval Petroleum Reserve No. 3 (NPR-3), in partnership with Sandia National Laboratories (SNL). The project encompassed the testing of a real-time wireless telemetry system in a simulated Measurement-While-Drilling (MWD) environment. A Surface Area Modulation (SAM) technique demonstrated data transmission rates greater than present techniques, in a deployment mode which requires

347

PIA - Rocky Mountain OTC GSS | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Rocky Mountain OTC GSS PIA - Rocky Mountain OTC GSS More Documents & Publications PIA - WEB Unclassified Business Operations General Support System Integrated Safety Management...

348

State geothermal commercialization programs in ten Rocky Mountain states. Semi-annual progress report, July-December 1979  

SciTech Connect

The activities and findings of the ten state teams participating in the Rocky Mountain Basin and Range Regional Hydrothermal Commercialization Program for the period are described. A summary of the state projects, compilation of project accomplishments, summary of findings, and a description of the major conclusions and recommendations are presented. Also included are chapters on the commercialization activities carried out by individual teams in each state: Arizona, Colorado, Idaho, Montana, Nevada, New-Mexico, North Dakota, South Dakota, Utah, and Wyoming. (MHR)

Griffith, J.L. (comp.)

1980-08-01T23:59:59.000Z

349

Colorado | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2004 1, 2004 EA-1506: Final Environmental Assessment Changing World Technologies' Thermal Conversion Process Commercial Demonstration Plant November 23, 2004 EA-1506: Finding of No Significant Impact Changing World Technologies' Thermal Conversion Process Commercial Demonstration Plant, Weld County, Colorado October 26, 2004 EIS-0362: Notice of Cancellation of the Environmental Impact Statement Colorado Springs Utilities Next-Generation CFB Coal Generating Unit, Fountain, Colorado June 30, 2004 EIS-0226: Revision to the Record of Decision Waste Isolation Pilot Plant Disposal Phase August 15, 2003 EIS-0362: Notice of Intent to Prepare an Environmental Impact Statement Colorado Springs Utilities Next-Generation CFB Coal Generating Unit, Fountain, Colorado July 22, 2003

350

Colorado State Regulations  

NLE Websites -- All DOE Office Websites (Extended Search)

Colorado Colorado State Regulations: Colorado State of Colorado The Colorado Oil and Gas Conservation Commission (COGCC), a division of the Department of Natural Resources (DNR), regulates oil and gas activities in Colorado. The COGCC has broad statutory authority with respect to impacts on any air, water, soil, or biological resources resulting from oil and gas operations. The COGCC implements the state ground water standards and classifications as they relate to oil and gas exploration and production (E&P) activities. The COGCC has jurisdiction for all Class II injection wells except those on Indian lands. The COGCC has jurisdiction for the management of all E&P wastes except at commercial disposal facilities. The Colorado Department of Public Health and Environment (CDPHE) administers the environmental protection laws related to air quality, waste discharge to surface water, and commercial disposal facilities.

351

Colorado PhysTEC http//phystec.colorado.edu  

E-Print Network (OSTI)

Colorado PhysTEC http//phystec.colorado.edu Goals The Goals of the Colorado PhysTEC grant are to in order to both measure impact and understand why activities do and do not succeed. Successes · Colorado access into teaching for physics majors. · The Colorado program has increased the number of physics

Finkelstein, Noah

352

University of Colorado Boulder journalism.colorado.edu Journalists  

E-Print Network (OSTI)

PAGE 1 Colorado University of Colorado Boulder journalism.colorado.edu Journalists of the Future of Colorado photographer Glenn Asakawa ('86), who explains how he came up with the idea: The cover CU Journalism & Mass Communication Cover photo by Glenn Asakawa ('86) University of Colorado

Mulligan, Jane

353

UNIVERSITY OF COLORADO SYSTEM Boulder Colorado Springs Denver  

E-Print Network (OSTI)

UNIVERSITY OF COLORADO SYSTEM Boulder · Colorado Springs · Denver Office of the Vice President for Academic Affairs and Research University of Colorado 2008 Diversity Report Boulder Campus Prepared by the University of Colorado System Office of Information & Analysis February 2008 http://www.colorado

Stowell, Michael

354

UNIVERSITY OF COLORADO SYSTEM Boulder Colorado Springs Denver  

E-Print Network (OSTI)

UNIVERSITY OF COLORADO SYSTEM Boulder · Colorado Springs · Denver Office of the Vice President for Academic Affairs and Research University of Colorado 2007 Diversity Report Update Boulder Campus Prepared by the University of Colorado System Office of Information & Analysis November 2007 http://www.colorado

Stowell, Michael

355

Colorado School of Mines 1 Colorado School of  

E-Print Network (OSTI)

Colorado School of Mines 1 Colorado School of Mines Bulletin 2013-2014 Mission and Goals Colorado the highest admission standards of any university in Colorado and among the highest of any public university education. The school's role and mission has remained constant and is written in the Colorado statutes as

356

Flat | Open Energy Information  

Open Energy Info (EERE)

Flat Flat Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Print PDF Flat Dictionary.png Flat: A relatively smooth landscape with no topographic relief Other definitions:Wikipedia Reegle Topographic Features List of topographic features commonly encountered in geothermal resource areas: Mountainous Horst and Graben Shield Volcano Flat Lava Dome Stratovolcano Cinder Cone Caldera Depression Resurgent Dome Complex The North Brawley Geothermal Power Plant is located in the Imperial Valley, California, a broad valley with flat topographic features. http://www.pcl.com/Projects-that-Inspire/Pages/North-Brawley-Geothermal-Power-Plant.aspx# Flat terrains are characterized by the absence of major topographic features. Flat topography is typically encountered in areas that have

357

ROCKY MOUNTAIN OILFIELD TESTING CENTER  

NLE Websites -- All DOE Office Websites (Extended Search)

NOVERFLO (SMART CABLE) NOVERFLO (SMART CABLE) LIQUID LEAK DETECTION SYSTEM FEBRUARY 12, 1996 FC9535/96ET3 RMOTC TEST REPORT NOVERFLO LIQUID LEAK DETECTION SYSTEM (SMART CABLE) Prepared for: INDUSTRY PUBLICATION Prepared by: RALPH SCHULTE RMOTC Project Engineer February 12, 1996 650200/9535:jb CONTENTS Page Summary 1 Introducation 1 NPR-3 Map 2 Description of Operations 3 1 st Test 3 2 nd Test 3 3 rd Test 4 4 th Test 5 Concluding Remarks 5 Acknowledgements 6 Rocky Mountain Oilfield Testing Center Technical Report Noverflo Liquid Leak Detection System (Smart Cable) Summary As part of RMOTC's continuing mission to support and strengthen the domestic oil and gas industry by allowing testing by individual inventors and commercial companies to evaluate their products and technology, RMOTC

358

ROCKY MOUNTAIN OILFIELD TESTING CENTER  

NLE Websites -- All DOE Office Websites (Extended Search)

AUTOMATIC SHUTDOWN VALVE AUTOMATIC SHUTDOWN VALVE CAMBRIA VALVE CORPORATION OCTOBER 17, 1995 FC9536/95ET1 RMOTC TEST REPORT Automatic Shutdown Valve Cambria Valve Corporation Prepared for: INDUSTRY PUBLICATION Prepared by: MICHAEL J. TAYLOR RMOTC Project Manager October 17, 1995 551103/9536:jb TABLE OF CONTENTS Page Introduction 1 Figure 1 2 Test Details 3 Table 1 4 Conclusions 5 Acknowledgments 5 ABSTRACT The Rocky Mountain Oilfield Testing Center (RMOTC) conducted a test of an Automatic Shutdown Valve (ASDV) for hydraulic systems at the Naval Petroleum Reserve No. 3 (NPR- 3). The Cambria Valve Corporation (CVC) manufactures the 3-Port ASDV that is designed to automatically shut down the flow of fluid through a hydraulic system in the event of a ruptured line and safely redirect flow to a bypass system. The CVC ASDV effectively demonstrated its

359

ROCKY MOUNTAIN OILFIELD TESTING CENTER  

NLE Websites -- All DOE Office Websites (Extended Search)

AUTOMATED THREE-PHASE CENTRIFUGE PROJECT AUTOMATED THREE-PHASE CENTRIFUGE PROJECT MARCH 30, 1998 FC9535/96ET5 RMOTC TEST REPORT AUTOMATED THREE-PHASE CENTRIFUGE PROJECT Centech, Inc. Prepared for: INDUSTRY PUBLICATION Prepared by: MICHAEL J. TAYLOR Project Manager March 30, 1998 850200/650200/650201:9583 ABSTRACT The Rocky Mountain Oilfield Testing Center (RMOTC) conducted a test of an Automated ThreePhase Centrifuge at the Department of Energy's Naval Petroleum Reserve No. 3 (NPR-3). Centech, Inc. has manufactured a three-phase centrifuge which has been retrofitted with a PCbased, fuzzy-logic, automated control system, by Los Alamos National Laboratory. The equipment is designed to automatically process tank-bottom wastes within operator-prescribed limits of Basic

360

State geothermal commercialization programs in seven Rocky Mountain states. Semiannual progress report, July-December 1980  

SciTech Connect

The activities and findings of the seven state commercialization teams participating in the Rocky Mountain Basin and Range commercialization program are described. Background information is provided; program objectives and the technical approach that is used are discussed; and the benefits of the program are described. The summary of findings is presented. Prospect identification, area development plans, site specific development analyses, time-phased project plans, the aggregated prospective geothermal energy use, and institutional analyses are discussed. Public outreach activities are covered and findings and recommendations are summarized. The commercialization activities carried out by the respective state teams are described for the following: Colorado, Montana, New Mexico, North Dakota, South Dakota, Utah, and Wyoming.

Lunis, B. C.; Toth, W. J. [comps.

1981-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "rocky flats colorado" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

State geothermal commercialization programs in seven Rocky Mountain states. Semiannual progress report, January-July 1981  

SciTech Connect

The activities and findings of the seven state commercialization teams participating in the Rocky Mountain Basin and Range commercialization program are described. For each state (Colorado, Montana, New Mexico, North and South Dakota, Utah, and Wyoming), prospect identification, area development plans, site specific development analyses, time-phased project plans, the aggregated prospective geothermal energy use, and institutional analyses are discussed. Public outreach activities are also covered, and findings and recommendations are given for each state. Some background information about the program is provided. (LEW)

Lunis, B.C.; Toth, W.J. (comps.)

1982-05-01T23:59:59.000Z

362

Colorado Natural Gas Processed in Colorado (Million Cubic Feet...  

Gasoline and Diesel Fuel Update (EIA)

Colorado (Million Cubic Feet) Colorado Natural Gas Processed in Colorado (Million Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2010's...

363

,"Colorado Natural Gas Prices"  

U.S. Energy Information Administration (EIA) Indexed Site

Name","Description"," Of Series","Frequency","Latest Data for" ,"Data 1","Colorado Natural Gas Prices",8,"Monthly","112014","1151989" ,"Release Date:","1302015"...

364

DOE SEEKS CONTRACTOR TO DISPOSITION WASTE AT THE ADVANCED MIXED...  

NLE Websites -- All DOE Office Websites (Extended Search)

facility. The waste includes DOE laboratory and processing wastes from the now closed Rocky Flats in Colorado, and various DOE facilities. The waste is stored in drums, boxes,...

365

EA-1093: Final Environmental Assessment | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

to maintain, the surface water drainage system serving the U.S. Department of Energy's Rocky Flats Environmental Technology Site located north of Golden, Colorado....

366

EA-1146: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment EA-1146: Final Environmental Assessment Radioactive Waste Storage at Rocky Flats Environmental Technology Site, Golden, Colorado This EA evaluates the...

367

First Savannah River Shipment Arrives At WIPP  

NLE Websites -- All DOE Office Websites (Extended Search)

to WIPP for permanent disposal. Four other sites were already shipping waste to WIPP: Rocky Flats Environmental Technology Site (Colorado), Los Alamos National Laboratory (New...

368

THE DEPARTMENT OF ENERGY Office of Public Affairs News Media...  

NLE Websites -- All DOE Office Websites (Extended Search)

management experience, including overseeing large construction projects at PNNL, DOE's Rocky Flats Plant in Colorado, and starting up the world's highest intensity free electron...

369

FOR IMMEDIATE RELEASE Contact: Ramsay Thurber Tel 303.492.2526  

E-Print Network (OSTI)

to Colorado in the late 70's and early 80's, Ellsberg blocked rail and road access to the Rocky Flats Nuclear

Stowell, Michael

370

DOE Chooses Idaho Treatment Group, LLC to Disposition Waste at...  

NLE Websites -- All DOE Office Websites (Extended Search)

facility. The waste includes DOE laboratory and processing materials from the former Rocky Flats nuclear weapons plant in Colorado and various other DOE facilities in Idaho...

371

WIPP Receives 200th Shipment  

NLE Websites -- All DOE Office Websites (Extended Search)

of defense- generated transuranic radioactive waste. The shipment came from DOE's Rocky Flats Environmental Technology Site (RFETS) in Colorado. "The arrival of the 200 th...

372

Hanford Shipment Arrives Safely At Waste Isolation Pilot Plant  

NLE Websites -- All DOE Office Websites (Extended Search)

63 shipments of transuranic waste. DOE has disposed of 41 shipments of waste from the Rocky Flats Environmental Technology Site (Boulder, Colorado), 17 shipments from Los...

373

Don Haward joins WIPP as manager of radiological control and...  

NLE Websites -- All DOE Office Websites (Extended Search)

West Valley Nuclear Services Company in New York. Harward comes to WID from the Rocky Flats Environmental Technology Site near Golden, Colorado, where he was the site...

374

WIPP Receives 100th Shipment  

NLE Websites -- All DOE Office Websites (Extended Search)

of Energy's (DOE) Waste Isolation Pilot Plant (WIPP). The shipment came from DOE's Rocky Flats Environmental Technology Site (RFETS) in Colorado. "This is a major milestone...

375

Jefferson Lab Leadership Council - Joe Scarcello  

NLE Websites -- All DOE Office Websites (Extended Search)

levels on DOE contracts at the Strategic Petroleum Reserves in Louisiana and Texas, the Rocky Flats Environmental Technology Site in Golden, Colorado, the Hanford Site, in...

376

Dear Mr  

Office of Environmental Management (EM)

Park now occupies the area previously dominated by the K-25 Gaseous Diffusion Plant; Rocky Flats, Colorado, where a nuclear weapons production facility has been replaced by...

377

EIS-0276: Notice of Intent to Prepare an Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Intent to Prepare an Environmental Impact Statement Interim Storage of Plutonium at the Rocky Flats Environmental Technology Site, Golden, Colorado The Department of Energy (DOE)...

378

ROCKY MOUNTAIN OILFIELD TESTING CENTER  

NLE Websites -- All DOE Office Websites (Extended Search)

MECHANICAL SLIMHOLE TESTING SYSTEM (MSTS) MECHANICAL SLIMHOLE TESTING SYSTEM (MSTS) SLIMHOLE DRILL STEM TESTER APRIL, 1995 FC9524/95DT4 MSTS Test in Casper Wyoming April 19,1995 Background MSTS EXP-2 was shipped back to SPT for modifications and re-testing. A 4-1/2" cased well at the Rocky Mountain Oilfield Testing Center (RMOTC) in Casper Wyoming was selected. The well conditions were: Casper Well Deviation 0 Casing 4-1/2" 10.5#/ft Test depth 5380 ft BHT NOT Tubing 2-3/8" 4.7#/ft Formation Fluid Water & Oil Kill Fluid 10#/gal brine The MSTS was tested with a single 3.06" Dowell packer which was set at 5380 ft, approximately 80 off bottom. The test string was configured: MSTS EXP-2 with Inflate recorder - HPR-D Formation Gage - HPR-D Single packer, Dowell 3.06 TFV - 12 inch stroke no cam 900 ft of 2-3/8" 4.7 #/ft tubing (3000 #)

379

Colorado | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Colorado Colorado Colorado December 16, 2013 The Integrated Biorefinery Research Facility at the National Renewable Energy Laboratory in Golden, Colorado enables partners to test conversion technologies on up to one ton of biomass material a day. | Photo by Dennis Schroeder, National Renewable Energy Laboratory From the Lab to Your Gas Tank: 4 Bioenergy Testing Facilities That Are Making a Difference The Energy Department is working to cut the cost of biofuel production by supporting advanced development and demonstration facilities throughout the country that enable researchers to fully examine their efforts on a large scale without having to maintain an expensive pilot plant. November 12, 2013 EA-1812: Finding of No Significant Impact Haxtun Wind Energy Project, Logan and Phillips Counties, Colorado

380

Colorado | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10, 2010 10, 2010 CX-003490: Categorical Exclusion Determination Install Monitoring Wells at Slick Rock West, Colorado, Processing Site CX(s) Applied: B3.1 Date: 08/10/2010 Location(s): Slick Rock, Colorado Office(s): Legacy Management August 10, 2010 CX-003488: Categorical Exclusion Determination New Verde Mine Investigations, Lease Tract C-G-26, Uranium Leasing Program CX(s) Applied: B1.28, B3.1 Date: 08/10/2010 Location(s): Mesa County, Colorado Office(s): Legacy Management August 5, 2010 COLORADO RECOVERY ACT SNAPSHOT The American Recovery & Reinvestment Act (ARRA) is making a meaningful down payment on the nation's energy and environmental future. The Recovery Act investments in Colorado are supporting a broad range of clean energy projects, from energy efficiency and the smart grid to solar power and

Note: This page contains sample records for the topic "rocky flats colorado" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

University of Colorado Boulder Colorado Springs Denver Anschutz Medical Campus  

E-Print Network (OSTI)

University of Colorado Boulder · Colorado Springs · Denver · Anschutz Medical Campus Michael Carrigan, Regent 555 Seventeenth Street, Suite 3200 Denver, Colorado 80202 Phone (303) 295-8314 TO: Steve SUBJECT: Restatement of the University of Colorado's Nondiscrimination Statement Regarding Sexual

Stowell, Michael

382

REFERENCES  

Science Journals Connector (OSTI)

......239,240Pu in soils around the Rocky Flats Environmental Technology Site...Plutonium in Soil around the Rocky Flats Plant. HASL-235 (U.S. Atomic...appraisal of 241Am in soils around Rocky Flats, Colorado, Health Phys. 71......

REFERENCES

2006-06-01T23:59:59.000Z

383

Colorado/Incentives | Open Energy Information  

Open Energy Info (EERE)

Colorado/Incentives Colorado/Incentives < Colorado Jump to: navigation, search Contents 1 Financial Incentive Programs for Colorado 2 Rules, Regulations and Policies for Colorado Download All Financial Incentives and Policies for Colorado CSV (rows 1 - 162) Financial Incentive Programs for Colorado Download Financial Incentives for Colorado CSV (rows 1 - 116) Incentive Incentive Type Active Alternative Fuel Vehicle Rebate (Colorado) State Rebate Program No Alternative Fuel Vehicle and Refueling - Corporate Tax Credit (Colorado) Corporate Tax Credit No Alternative Fuel Vehicle and Refueling - Personal Tax Credit (Colorado) Personal Tax Credit No Aspen - Grid-Tied Micro Hydro Grant (Colorado) Local Grant Program No Aspen - Solar Power Pioneer Loan Program (Colorado) Local Loan Program No

384

Diesel prices flat  

U.S. Energy Information Administration (EIA) Indexed Site

Diesel prices flat The U.S. average retail price for on-highway diesel fuel saw no movement from last week. Prices remained flat at 3.89 a gallon on Monday, based on the weekly...

385

Northern Colorado Clean Energy Cluster | Open Energy Information  

Open Energy Info (EERE)

Energy Cluster Energy Cluster Jump to: navigation, search Name Northern Colorado Clean Energy Cluster Place Denver, Colorado Zip 80202 Region Rockies Area Notes Business-led, project-oriented group of regional partners seeking to have a global impact Website http://www.nccleanenergy.com/ Coordinates 39.7541032°, -105.0002242° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.7541032,"lon":-105.0002242,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

386

State of Colorado Wildfire Hazard  

E-Print Network (OSTI)

State of Colorado Wildfire Hazard Mitigation Plan Colorado Multi-Hazards Mitigation Plan July 2002 the May 2001 Report to the Governor, Colorado Wildland Urban Interface; Section 2 includes the Hazard the status of the Wildland Urban Interface in Colorado; the hazards that exist; mitigation measures

387

Colorado State University Extension. 2011.  

E-Print Network (OSTI)

by the Western Resource Advocates estimates Colorado single family residential use between 96 and 143 gallons perXCM-219 © Colorado State University Extension. 2011. To Household Water Conservation Colorado supplies. Fortunately, most of the water supply for Colorado's urban dwellers is renewed annually

388

Eagle County, Colorado Data Dashboard  

Energy.gov (U.S. Department of Energy (DOE))

The data dashboard for Eagle County, Colorado, a partner in the Better Buildings Neighborhood Program.

389

CURRICULUM VITAE David F. Murray  

E-Print Network (OSTI)

Society of America Publications: Murray, D. F. 1967. Gravel mounds at Rocky Flats, Colorado. The Mountain:106-110. Murray, D. F. 1969. Taxonomy of Carex sect. Atratae (Cyperaceae) in the southern Rocky Mountains

Ickert-Bond, Steffi

390

Jerri McTaggart--Creating educational opportunities  

E-Print Network (OSTI)

afforded at the time, so she left research and took at job at Colorado's Rocky Flats nuclear plant that supports military veterans' children. A rocky road to success Although she had a science undergraduate

391

Colorado Industrial Challenge and Recognition Program | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Colorado Industrial Challenge and Recognition Program Colorado Industrial Challenge and Recognition Program This fact sheet offers details of the Colorado Industrial program state...

392

A Colorado Perspective: The New Energy Economy  

E-Print Network (OSTI)

transmission, have languished. Colorado looks forward withA Colorado Perspective: The New Energy Economy Jim Martin*REPORTING .. VIII. COLORADO'S STATE

Martin, Jim; Brannon, Ginny

2009-01-01T23:59:59.000Z

393

Northern Rockies Geothermal Region | Open Energy Information  

Open Energy Info (EERE)

Northern Rockies Geothermal Region Northern Rockies Geothermal Region Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Northern Rockies Geothermal Region Details Areas (0) Power Plants (0) Projects (0) Techniques (0) Map: {{{Name}}} Province is situated in northern Idaho and western Montana and includes folded mountains, fault-bounded uplifts, and volcanics formed during middle Cretaceous to late Eocene mountain period. The region is structtually cojmplex with faulting and folding asociated with eastward thrust faulting. Western Montana and northwestern Wyoming contain large areas of Tertiary volcanic rocks, including smaller localized Quaternary silicic volcanic rocks. Replace Citation[1] References ↑ "Replace Citation" Geothermal Region Data State(s) Idaho, Montana Area 97,538 km²97,538,000,000 m²

394

Rocky Ridge I | Open Energy Information  

Open Energy Info (EERE)

I I Jump to: navigation, search Name Rocky Ridge I Facility Rocky Ridge I Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Enel Green Power North America / TradeWind Energy Developer TradeWind Energy Energy Purchaser Western Farmers Electric Cooperative Location Rocky OK Coordinates 35.055821°, -98.838426° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.055821,"lon":-98.838426,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

395

Colorado | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 9, 2010 July 9, 2010 CX-002956: Categorical Exclusion Determination Maximizing Alternative Fuel Use and Distribution in Colorado CX(s) Applied: B5.1 Date: 07/09/2010 Location(s): Fort Collins, Colorado Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory June 25, 2010 CX-002923: Categorical Exclusion Determination Reclamation Project in Lease Tract C-G-27, Uranium Leasing Program CX(s) Applied: B1.28, B1.3 Date: 06/25/2010 Location(s): Mesa County, Colorado Office(s): Legacy Management June 25, 2010 CX-002920: Categorical Exclusion Determination Reclamation Projects in Jo Dandy Lease Tract C-JD-7, Uranium Leasing Program CX(s) Applied: B1.28, B1.3 Date: 06/25/2010 Location(s): Naturita, Colorado Office(s): Legacy Management June 25, 2010

396

Colorado | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10, 2010 10, 2010 CX-004644: Categorical Exclusion Determination Research Support Facility II, Cafeteria; National Renewable Energy Laboratory Tracking Number 11-003 CX(s) Applied: B1.15, B5.1 Date: 12/10/2010 Location(s): Golden, Colorado Office(s): Energy Efficiency and Renewable Energy, Golden Field Office December 8, 2010 CX-004643: Categorical Exclusion Determination Colorado State Energy Program American Recovery and Reinvestment Act - Renewable Ready Grant - PAWS For Life CX(s) Applied: B5.1 Date: 12/08/2010 Location(s): Pueblo, Colorado Office(s): Energy Efficiency and Renewable Energy, Golden Field Office December 8, 2010 CX-004639: Categorical Exclusion Determination Colorado State Energy Program American Recovery and Reinvestment Act - Geothermal Power Direct Use Grant - Town of Rico

397

Response to comments received from the State of Colorado and the public on the Environmental Assessment for resumption of thermal stabilization of plutonium oxide in Building 707  

SciTech Connect

The Department of Energy (DOE) prepared this document to respond to comments from the State of Colorado and the public on the draft Environmental Assessment (EA) for the Resumption of Thermal Stabilization of Plutonium Oxide in Building 707 at the Rocky Flats Plant (RFP) in Golden, Colorado. The draft EA was provided to the State of Colorado and the public on September 8, 1993, for a comment period of 60 days. The Department`s National Environmental Policy Act (NEPA) Implementing Procedures (10 Code of Federal Regulations [CFR] 1021.301) requires that prior to approval of the EA, DOE is to allow the host State and Indian Tribe a period of from 14 to 30 days to review and comment on the EA. The Department established a comment period of 60 days for this EA in response to requests by the public during the first public meeting on July 7, 1993, before preparation of the EA. Other issues raised at the July 7 meeting included the range of alternatives to be considered, the time period for preparation of the EA, and the amount of material to be thermally stabilized. These and other comments made by the public at that meeting were carefully considered in preparation of the EA. In addition to providing the preapproval draft EA to the State of Colorado, DOE distributed the EA to all persons and groups on the RFP public information mailing list and placed the EA and reference documents in the DOE Public Reading Rooms in the RFP area. A public meeting was held on October 6, 1993, to hear public comments on the draft EA. All comments on the draft EA, those received both at the October 6 public meeting and through correspondence, have been reproduced in their entirety in this Response to Comments document. Responses to the commenters` questions and concerns are provided, and changes made to the body of the EA are indicated in the responses. All comments received have been considered in the revision of the EA.

Not Available

1994-02-01T23:59:59.000Z

398

ii Colorado Climate Table of Contents  

E-Print Network (OSTI)

#12;ii Colorado Climate Table of Contents Web: http://climate.atmos.colostate.edu Colorado Climate Spring 2002 Vol. 3, No. 2 Lightning in Colorado . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 Colorado Climate in Review

399

Southeastern Colorado Survey of Critical Biological Resources  

E-Print Network (OSTI)

Southeastern Colorado Survey of Critical Biological Resources: Landowner's Guide to Livestock and Biodiversity Prepared By: Paul Holsinger, Project Assistant and Chris West, Executive Director Colorado Colorado Landowner's Guide to Livestock and Biodiversity Introduction Southeastern Colorado Survey

400

Colorado/Transmission/Agencies | Open Energy Information  

Open Energy Info (EERE)

Agencies < Colorado | Transmission Jump to: navigation, search Colorado Transmission Roadmap Agency Links Local Regulations State Regulations Summary General Transmission...

Note: This page contains sample records for the topic "rocky flats colorado" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Colorado: Colorado's Clean Energy Resources and Economy (Brochure)  

SciTech Connect

This document highlights the Office of Energy Efficiency and Renewable Energy's investments and impacts in the state of Colorado.

Not Available

2013-03-01T23:59:59.000Z

402

Microsoft Word - S09187_1stQtr2012.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

Rocky Flats, Colorado, Site Rocky Flats, Colorado, Site Quarterly Report of Site Surveillance and Maintenance Activities First Quarter Calendar Year 2012 July 2012 LMS/RFS/S09187 This page intentionally left blank LMS/RFS/S09187 U.S. Department of Energy Office of Legacy Management Rocky Flats, Colorado, Site Quarterly Report of Site Surveillance and Maintenance Activities First Quarter Calendar Year 2012 July 2012 This page intentionally left blank U.S. Department of Energy Rocky Flats Site Quarterly Report of Site Surveillance and Maintenance Activities-1st Quarter CY 2012 July 2012 Doc. No. S09187 Page i Contents Abbreviations .................................................................................................................................. v

403

The 2013 Colorado Flood Nolan Doesken  

E-Print Network (OSTI)

The 2013 Colorado Flood Nolan Doesken Colorado Climate Center Colorado State University http://ccc.atmos.colostate.edu Presented 27 Feb 2014 Colorado Flood Forum Broomfield, Colorado Prepared with assistance from Zach Schwalbe and Wendy Ryan #12;Since the late 1990s Colorado had not experienced any widespread severe flooding #12

404

The Colorado Rare Plant Technical Committee presents: Colorado Rare Plant Symposium  

E-Print Network (OSTI)

The Colorado Rare Plant Technical Committee presents: 5th Annual Colorado Rare Plant Symposium September 5, 2008 Montrose, Colorado Sponsored by: Colorado Rare Plant Technical CommitteeColorado Rare Plant Technical Committee Colorado Native Plant Society University of Colorado Herbarium US Fish

405

Colorado | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2010 5, 2010 CX-001493: Categorical Exclusion Determination National Renewable Energy Laboratory Shuttle Service to Regional Transportation District Hubs CX(s) Applied: B1.32 Date: 04/05/2010 Location(s): Colorado Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 2, 2010 School District Harnesses Wind to Teach Students In addition to saving the school district money, a new wind turbine will give students hand-on experience and teach them about the benefits of renewable energy. April 1, 2010 CX-001440: Categorical Exclusion Determination Evaluation of Novel Technologies for Carbon Dioxide Capture CX(s) Applied: B3.6 Date: 04/01/2010 Location(s): Colorado Springs, Colorado Office(s): Fossil Energy, National Energy Technology Laboratory March 30, 2010

406

Colorado | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 25, 2011 August 25, 2011 CX-006511: Categorical Exclusion Determination Improving Fuel Efficiency through Innovative Tire Design and Materials CX(s) Applied: A9 Date: 08/25/2011 Location(s): Golden, Colorado Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory August 24, 2011 CX-006591: Categorical Exclusion Determination Invasive Species Removal and Reclamation in Gold Eagle Mining, Incorporated CX(s) Applied: B1.3, B1.20 Date: 08/24/2011 Location(s): San Miguel County, Colorado Office(s): Legacy Management August 17, 2011 ICEIWG Kick-Off Meeting Participant List August 16, 2011 CX-006540: Categorical Exclusion Determination Wells Fargo Property Structure Removal CX(s) Applied: B1.23 Date: 08/16/2011 Location(s): Golden, Colorado Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

407

Colorado | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 22, 2011 September 22, 2011 CX-007006: Categorical Exclusion Determination Unique Lanthanide-Free Motor Construction CX(s) Applied: B3.6 Date: 09/22/2011 Location(s): Golden, Colorado Office(s): Energy Efficiency and Renewable Energy September 22, 2011 CX-007000: Categorical Exclusion Determination Unique Lanthanide-Free Motor Construction CX(s) Applied: B3.6 Date: 09/22/2011 Location(s): Longmont, Colorado Office(s): Energy Efficiency and Renewable Energy, Sandia Site Office September 20, 2011 CX-007037: Categorical Exclusion Determination Stand Alone Battery Thermal Management System CX(s) Applied: B3.6 Date: 09/20/2011 Location(s): Golden, Jefferson, Colorado Office(s): Energy Efficiency and Renewable Energy September 14, 2011 CX-006769: Categorical Exclusion Determination

408

Colorado | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31, 2006 31, 2006 New Facility Will Test Disposal Cell Cover Renovation New Facility Will Test Disposal Cell Cover Renovation November 20, 2006 EA-1456: Finding of No Signficant Impact Cheyenne-Miracle Mile and Ault-Cheyanne Transmission Line Rebuild Project Carbon, Albany and Laramie Counties, Wyoming and Weld County, Colorado September 1, 2006 EA-1456: Mitigation Action Plan Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project Carbon, Albany and Laramie Counties, Wyoming and Weld County, Colorado November 16, 2005 EA-1508: Finding of No Significant Impact Beaver Creek-Hoyt-Erie 115-kV Transmission Line Upgrade, Morgan and Weld Counties, Colorado November 1, 2005 EA-1508: Mitigation Action Plan Beaver Creek-Hoyt-Erie Transmission Line Upgrade Project Morgan and Weld

409

Colorado | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

22, 2010 22, 2010 CX-001701: Categorical Exclusion Determination Topic B - Cooperation on Electric Resource Planning and Priorities CX(s) Applied: A9, A11 Date: 04/22/2010 Location(s): Denver, Colorado Office(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory April 21, 2010 CX-001723: Categorical Exclusion Determination National Renewable Energy Laboratory Bus Service to Off-Site Parking lot CX(s) Applied: A7 Date: 04/21/2010 Location(s): Golden, Colorado Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 21, 2010 CX-001722: Categorical Exclusion Determination National Renewable Energy Laboratory Leased Offsite Parking CX(s) Applied: A7 Date: 04/21/2010 Location(s): Golden, Colorado Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

410

Colorado | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 17, 2010 September 17, 2010 CX-004014: Categorical Exclusion Determination Commercializing the GridAgents Suite: Photovoltaics Integration Plus (PVI+) Software CX(s) Applied: B3.6, B5.1 Date: 09/17/2010 Location(s): Boulder, Colorado Office(s): Energy Efficiency and Renewable Energy September 16, 2010 CX-003699: Categorical Exclusion Determination Multi-Level Energy Storage and Controls for Large-Scale Wind Energy Integration CX(s) Applied: A9, B3.6 Date: 09/16/2010 Location(s): Colorado Office(s): Energy Efficiency and Renewable Energy, Golden Field Office September 16, 2010 CX-004017: Categorical Exclusion Determination High-Temperature Wire Insulations for Downhole Enhanced Geothermal System (EGS) Equipment CX(s) Applied: B3.6, B5.1 Date: 09/16/2010 Location(s): Lafayette, Colorado

411

Colorado Water Resources Research Institute Special Report No. 16  

E-Print Network (OSTI)

Colorado Water Resources Research Institute Special Report No. 16 Colorado Department of Agriculture Colorado State University Extension Colorado Department of Public Health and Environment #12;Colorado Water Resources Research Institute Special Report No. 16 Colorado State University is an equal

412

Drought Update Colorado Climate Center  

E-Print Network (OSTI)

Drought Update Colorado Climate Center Roger Pielke, Sr., Director Prepared by Tara Green and Odie Bliss http://climate.atmos.colostate.edu #12;© 2003 by The Colorado Climate Center. 2 http://www.ncdc.noaa.gov/oa/climate/research/2003/mar/st005dv00pcp200303.html #12;© 2003 by The Colorado Climate Center. 3 #12;© 2003

413

Colorado State University Career Center  

E-Print Network (OSTI)

Colorado State University Career Center Director The Division of Student Affairs at Colorado State body of approximately 26,700 at a major state land grant university. Colorado State University blend of metropolitan advantages and small town friendliness. Located at the western edge of the Great

414

Colorado.indd  

NLE Websites -- All DOE Office Websites (Extended Search)

Colorado Colorado www.effi cientwindows.org March 2013 1. Meet the Energy Code and Look for the ENERGY STAR ® Windows must comply with your local energy code. Windows that are ENERGY STAR qualifi ed typically meet or exceed energy code requirements. To verify if specific window energy properties comply with the local code requirements, go to Step 2. 2. Look for Effi cient Properties on the NFRC Label The National Fenestration Rating Council (NFRC) label is needed for verifi cation of energy code compliance (www.nfrc. org). The NFRC label displays whole- window energy properties and appears on all fenestration products which are part of the ENERGY STAR program.

415

The Resolution of Mixtures of Carbon Dioxide and Nitrous Oxide by Gas Solid Chromatography  

Science Journals Connector (OSTI)

......1106. R. P. DeGrazio The Dow Chemical Company, Rocky Flats Division, Golden, Colorado The Resolution of Mixtures...Chromatography* by R. P. DeGrazio, The Dow Chemical Company, Rocky Flats Division, Golden, Colorado A simple and unique chromato......

R. P. DeGrazio

1965-06-01T23:59:59.000Z

416

A Gas Mixing and Sampling Flask  

Science Journals Connector (OSTI)

......1106. R. P. DeGrazio The Dow Chemical Company, Rocky Flats Division, Golden, Colorado A flask was designed whereby...Flask* by R. P. DeGrazio, The Dow Chemical Company, Rocky Flats Division, Golden, Colorado Abstract A flask was designed......

R. P. DeGrazio

1968-09-01T23:59:59.000Z

417

Rocky Mountain Area Coordination Center Joint Information Center  

E-Print Network (OSTI)

and windy weather is forecast for much of the week across northern Colorado, most of Wyoming and western is forecasting extreme fire danger for most of Wyoming, northeastern Colorado, western Nebraska and western South Dakota. Northwest Colorado and western Kansas and eastern Colorado, to include the Front Range are under

418

ROCKY MOUNTAIN OILFIELD TESTING CENTER MICROTURBINE PROJECT  

NLE Websites -- All DOE Office Websites (Extended Search)

MICROTURBINE PROJECT MICROTURBINE PROJECT Stacy & Stacy Consulting, LLC March 31, 1998 ROCKY MOUNTAIN OILFIELD TESTING CENTER MICROTURBINE PROJECT Stacy & Stacy Consulting, LLC Prepared for: INDUSTRY PUBLICATION Prepared by: MICHAEL J. TAYLOR Project Manager March 31, 1998 JO 850200 : FC 980009 ABSTRACT The Rocky Mountain Oilfield Testing Center (RMOTC) conducted a demonstration of gas-fired, integrated microturbine systems at the Department of Energy's Naval Petroleum Reserve No. 3 (NPR-3), in partnership with Stacy & Stacy Consulting, LLC (Stacy & Stacy). The project encompassed the testing of two gas microturbine systems at two oil-production wellsites. The microturbine-generators were fueled directly by casinghead gas to power their beam-pumping-unit motors. The system at well 47-A-34 utilized the casinghead sweet gas (0-ppm

419

Summer 2001 Vol. 2, No. 3 ii Colorado Climate  

E-Print Network (OSTI)

Colorado Climate Summer 2001 Vol. 2, No. 3 #12;ii Colorado Climate Table of Contents Nocturnal Tornado Hits Eastern Colorado . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Colorado Tornado Facts

420

Colorado: A New Chapter in its Perpetual Recovery  

E-Print Network (OSTI)

Withdraw from Guv Race, Colorado Statesman, September 3. Wyatt, K. (2011) Colorado House Gives Final Approval to $well. For the moment, Colorados fiscal puzzles are wrapped

Moore, Scott T.

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "rocky flats colorado" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

THERMODYNAMIC LIMITS ON MAGNETODYNAMOS IN ROCKY EXOPLANETS  

SciTech Connect

To ascertain whether magnetic dynamos operate in rocky exoplanets more massive or hotter than the Earth, we developed a parametric model of a differentiated rocky planet and its thermal evolution. Our model reproduces the established properties of Earth's interior and magnetic field at the present time. When applied to Venus, assuming that planet lacks plate tectonics and has a dehydrated mantle with an elevated viscosity, the model shows that the dynamo shuts down or never operated. Our model predicts that at a fixed planet mass, dynamo history is sensitive to core size, but not to the initial inventory of long-lived, heat-producing radionuclides. It predicts that rocky planets larger than 2.5 Earth masses will not develop inner cores because the temperature-pressure slope of the iron solidus becomes flatter than that of the core adiabat. Instead, iron 'snow' will condense near or at the top of these cores, and the net transfer of latent heat upward will suppress convection and a dynamo. More massive planets can have anemic dynamos due to core cooling, but only if they have mobile lids (plate tectonics). The lifetime of these dynamos is shorter with increasing planet mass but longer with higher surface temperature. Massive Venus-like planets with stagnant lids and more viscous mantles will lack dynamos altogether. We identify two alternative sources of magnetic fields on rocky planets: eddy currents induced in the hot or molten upper layers of planets on very short-period orbits, and dynamos in the ionic conducting layers of 'ocean' planets with {approx}10% mass in an upper mantle of water (ice).

Gaidos, Eric; Conrad, Clinton P. [Department of Geology and Geophysics, University of Hawaii at Manoa, Honolulu, HI 96822 (United States); Manga, Michael; Hernlund, John [Department of Earth and Planetary Science, University of California at Berkeley, Berkeley, CA 94720 (United States)

2010-08-01T23:59:59.000Z

422

Colorado | OpenEI Community  

Open Energy Info (EERE)

Colorado Colorado Home Kyoung's picture Submitted by Kyoung(155) Contributor 7 March, 2013 - 10:24 Colorado Meeting 1031 regulations Colorado Yesterday, we held a meeting with Colorado state agencies and geothemral developers to review the flowcharts and preliminary content of the Colorado Geothemral Roadmap. The meeting was well-attended with over 25 attendees! In addition, we had discussions with county officials and concerned developers about the yet-to-be-developed regulations for 1041 permits. It was noted that the state has funded the drafting of guidelines which are currently being developd and scheduled for draft release in mid-March 2013. Kyoung's picture Submitted by Kyoung(155) Contributor 7 January, 2013 - 10:09 Happy New Year! analysis BHFS Colorado interface

423

Microsoft Word - 12361  

Office of Legacy Management (LM)

Solar-Powered Air Stripping at the Rocky Flats Site, Colorado Solar-Powered Air Stripping at the Rocky Flats Site, Colorado Appendix F, Page 1 WM2012 Conference, February 26 - March 1, 2012, Phoenix, Arizona, USA 1 Solar-Powered Air Stripping at the Rocky Flats Site, Colorado - 12361 John A. Boylan* *S.M. Stoller Corporation, Rocky Flats Site, 11025 Dover Street, Suite 1000, Westminster, Colorado 80021 ABSTRACT The U.S. Department of Energy's Rocky Flats Site (the Site), near Denver, Colorado, is a former nuclear weapons facility that was constructed beginning in 1951. With the end of the Cold War, the Site was cleaned up and closed in 2005. Four gravity-driven groundwater treatment systems were installed during cleanup, and their continued operation was incorporated into the final remedy for the Site. All utilities, including electrical power, were removed as part of this closure,

424

ROCKY MOUNTAIN OILFIELD TESTING CENTER PROJECT TEST RESULTS  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Manager Rocky Mountain Oilfield Testing Center March 31, 1998 RMOTC Test Report GMT Production Stimulation Test Executive Summary The sulfates in oilfield...

425

Rocky Mountain White Tilapia Aquaculture Low Temperature Geothermal...  

Open Energy Info (EERE)

White Tilapia Aquaculture Low Temperature Geothermal Facility Jump to: navigation, search Name Rocky Mountain White Tilapia Aquaculture Low Temperature Geothermal Facility Facility...

426

Rocky Mountain Power- Residential Energy Efficiency Rebate Program  

Energy.gov (U.S. Department of Energy (DOE))

Rocky Mountain Power offers the Home Energy Savings Program for their residential Wyoming customers to improve the energy efficiency of their homes. Incentives are available for energy efficient...

427

Rocky Mountain Power- Residential Energy Efficiency Rebate Program  

Energy.gov (U.S. Department of Energy (DOE))

Rocky Mountain Power provides incentives for residential customers in Idaho to install energy efficient equipment in participating homes. Rebates are available for qualified appliances,...

428

MixedConifer Forests in Southwest Colorado  

E-Print Network (OSTI)

April 2010 Mixed­Conifer Forests in Southwest Colorado A Summary of Existing Knowledge and Considerations for Restoration and Management #12;Mixed Conifer Forests in Southwest Colorado 1Mixed-Conifer Forests in Southwest Colorado 1 ABOUT THE COLORADO FOREST RESTORATION INSTITUTE The Colorado Forest

429

Colorado's AMAZING Climate Nolan Doesken, State Climatologist  

E-Print Network (OSTI)

Colorado's AMAZING Climate Nolan Doesken, State Climatologist Colorado Climate Center Atmospheric Science Department Colorado State University Fort Collins, CO Graphics assistance provided by Wendy Ryan Colorado without · Later that same year, Colorado re-established the State Climate program with support

430

Southeastern Colorado Survey of Critical Biological Resources  

E-Print Network (OSTI)

Southeastern Colorado Survey of Critical Biological Resources 2007 #12;ii #12;Southeastern Colorado Survey of Critical Biological Resources Prepared for: Colorado Cattleman's Agricultural Land Trust 8833 Ralston Road Arvada, CO 80002 Great Outdoors Colorado 1600 Broadway, Suite 1650 Denver, CO 80202 Colorado

431

The Colorado Rare Plant Technical Committee presents  

E-Print Network (OSTI)

The Colorado Rare Plant Technical Committee presents: 3rd Annual Rare Plant Symposium Sponsored by: Colorado Native Plant Society University of Colorado Herbarium US Fish and Wildlife Service Colorado and Eastern Colorado (Las Animas, Weld, Kit Carson, Huerfano, Pueblo, Otero, Prowers, Fremont, and El Paso

432

Colorado | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 26, 2010 January 26, 2010 CX-000643: Categorical Exclusion Determination Development of Advanced Thermal-Hydrological-Mechanical-Chemical Modeling Capabilities for Enhanced Geothermal Systems CX(s) Applied: A9, B3.6 Date: 01/26/2010 Location(s): Golden, Colorado Office(s): Energy Efficiency and Renewable Energy, Golden Field Office January 26, 2010 CX-000645: Categorical Exclusion Determination Development and Validation of an Advanced Stimulation Prediction Model for Enhanced Geothermal Systems CX(s) Applied: A9, B3.6 Date: 01/26/2010 Location(s): Golden, Colorado Office(s): Energy Efficiency and Renewable Energy, Golden Field Office January 21, 2010 CX-000630: Categorical Exclusion Determination A Partnership Model to Build Solar Training Capacity in the Midwest CX(s) Applied: A9, A11

433

Colorado Gap Analysis  

NLE Websites -- All DOE Office Websites (Extended Search)

Colorado Gap Analysis Colorado Gap Analysis 2 The Building Codes Assistance Project (BCAP) BCAP is a non-profit advocacy organization established in 1994 as a joint initiative of the Alliance to Save Energy, the American Council for an Energy-Efficient Economy, and the Natural Resources Defense Council. BCAP focuses on providing state and local governments in the U.S., as well as stakeholder organizations, with support on code adoption and implementation through direct assistance, research, data analysis, and coordination with other activities and allies. With over sixteen years of experience supporting numerous state energy offices and city building departments, along with tracking code activities across the country, BCAP is well-positioned to assist in local and statewide activity to advance

434

Colorado | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 27, 2009 July 27, 2009 EIS-0403: Notice to Extend Public Comment Period Solar Energy Development in Six Southwestern States June 30, 2009 EIS-0403: BLM Notice of Availability of Maps and Additional Public Scoping from the Programmatic Environmental Impact Statement (Second Scoping Period) Solar Energy Development in Six Southwestern States March 26, 2009 Obama Administration Announces Additional $42,618,700 for Local Energy Efficiency Improvements in Colorado Block Grants to Support Jobs, Cut Energy Bills, and Increase Energy Independence March 12, 2009 Obama-Biden Administration Announces More Than $128.7 Million in Weatherization Funding and Energy Efficiency Grants for Colorado Part of nearly $8 billion in Recovery Act funding for energy efficiency efforts nationwide that will create 100,000 jobs and cut energy bills for

435

Colorado | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 24, 2011 February 24, 2011 CX-005324: Categorical Exclusion Determination Boeing Distribution Management System (BDMS) CX(s) Applied: A1, A9, A11, B1.2, B1.7 Date: 02/24/2011 Location(s): Fort Collins, Colorado Office(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory February 16, 2011 CX-005199: Categorical Exclusion Determination Development of Molten-Salt Heat Transfer Fluid Technology for Parabolic Trough Solar Power Plants CX(s) Applied: A9, B3.6 Date: 02/16/2011 Location(s): Lakewood, Colorado Office(s): Energy Efficiency and Renewable Energy, Golden Field Office February 16, 2011 CX-005198: Categorical Exclusion Determination Development of Molten-Salt Heat Transfer Fluid Technology for Parabolic Trough Solar Power Plants CX(s) Applied: A9, B3.6

436

Colorado | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar, Wind, and Energy Efficiency Easements and Rights Laws Solar, Wind, and Energy Efficiency Easements and Rights Laws Colorado's solar access laws, which date back to 1979, prohibit any residential covenants that restrict solar access. October 16, 2013 Solar Construction Permitting Standards Owners of solar photovoltaic (PV) systems and solar water heating systems in Colorado are required to obtain a building permit before their systems may be installed. Permits are handled at the local level and awarded by counties and municipalities. Traditionally, counties and municipalities have been free to assign their own fees for a permit. These fees can vary broadly in size across jurisdictions and in some cases, can be large enough to potentially discourage the installation of solar devices. October 16, 2013 Sangre De Cristo Electric Association - Energy Efficiency Credit Program

437

Colorado | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 9, 2012 April 9, 2012 EA-1887: Finding of No Significant Impact Renewable Fuel Heat Plant Improvements at the National Renewable Energy Laboratory, Golden, Colorado (DOE/EA-1573-S1) April 9, 2012 EA-1887: Supplemental Environmental Assessment Renewable Fuel Heat Plant Improvements at the National Renewable Energy Laboratory, Golden, Colorado (DOE/EA-1573-S1) March 30, 2012 EIS-0400: EPA Notice of Availability of a Draft Environmental Impact Statement Grandby Pumping Plant Switchyard Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO March 20, 2012 EIS-0400: Draft Environmental Impact Statement Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO February 29, 2012 EA-1884: Draft Environmental Assessment

438

Colorado | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 9, 2012 January 9, 2012 Transmission Forum Agenda - February 2012 December 21, 2011 CX-007391: Categorical Exclusion Determination Time-lapse Joint Inversion of Geophysical Data and its Application to Geothermal Prospecting GEODE CX(s) Applied: A9, B3.1, B3.6 Date: 12/21/2011 Location(s): Colorado Offices(s): Golden Field Office December 21, 2011 CX-007389: Categorical Exclusion Determination Advances in Hydrogeochemical Indicators for the Discovery of New Geothermal Resources in the Great Basin CX(s) Applied: A9, B3.6 Date: 12/21/2011 Location(s): Colorado Offices(s): Golden Field Office December 20, 2011 CX-007461: Categorical Exclusion Determination High Resolution 3-dimensional Laser Imaging for Inspection, Maintenance, Repair and Operations - Phase II CX(s) Applied: B3.6

439

Colorado | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Xcel Energy (Gas) - Residential Energy Efficiency Rebate Programs Xcel Energy (Gas) - Residential Energy Efficiency Rebate Programs Xcel Energy residential customers in Colorado can qualify for cash incentives on a variety of energy efficient products and home improvements. Standard rebates are available for heat pumps, evaporative coolers, central A/C systems, furnaces, boilers, water heaters and insulation which meet the program requirements. Rebate program expiration dates may vary depending on the technology. Consult website for more specific rebate amount structure. Only equipment which meets minimum efficiency standards will be included in rebate program. October 16, 2013 Xcel Energy (Gas) - Business Energy Efficiency Rebate Programs Xcel Energy offers rebate programs for Colorado commercial and industrial customers for a wide range of energy efficiency technologies including

440

Colorado | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 10, 2010 March 10, 2010 CX-001062: Categorical Exclusion Determination High-Temperature, High-Pressure Devices for Zonal Isolation in Geothermal Wells CX(s) Applied: A9, B3.6 Date: 03/10/2010 Location(s): Lafayette, Colorado Office(s): Energy Efficiency and Renewable Energy, Golden Field Office March 9, 2010 Denver Museum of Nature & Science is planning to install a heat pump system that utilizes the city's municipal water system. | Photo courtesy of Denver Museum of Nature & Science Denver Museum Taps Into Unique Geothermal Source The Denver Museum of Nature & Science makes use of the recycled wastewater rushing through the pipes below their exhibits. March 9, 2010 CX-006299: Categorical Exclusion Determination Colorado-County-Mesa CX(s) Applied: A1, A9, B1.32, B5.1

Note: This page contains sample records for the topic "rocky flats colorado" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

City of Fort Morgan, Colorado (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

Fort Morgan Fort Morgan Place Colorado Utility Id 6610 Utility Location Yes Ownership M NERC Location WECC NERC WECC Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png COMMERCIAL AREA LIGHTING (FLAT RATE) Lighting HIGHWAY FOG LIGHTING (FLAT RATE) Lighting INDUSTRIAL TRANSMISSION LEVEL Industrial INTERRUPTIBLE LOAD MANAGEMENT SERVICE Industrial IRRIGATION Commercial LARGE COMMERCIAL Commercial MUNICIPAL Commercial RESIDENTIAL DEMAND METERED Residential RESIDENTIAL GENERAL Residential RESIDENTIAL LIGHTING (FLAT RATE) Lighting SMALL COMMERCIAL DEMAND METERED Commercial

442

Rocky Flats Plant precipitate sludge surrogate vitrification demonstration. Technical Task Plan  

SciTech Connect

Technologies are being developed by the US Department of Energy`s (DOE) Nuclear Facility sites to convert hazardous and mixed wastes to a form suitable for permanent disposal. The preferred disposal method would be one that is capable of consistently producing a durable leach resistant wasteform, while simultaneously minimizing disposal volumes. Vitrification, which has been declared the Best Demonstrated Available Technology (BDAT) for high-level radioactive waste disposal by the EPA, is capable of producing a highly durable wasteform that minimizes disposal volumes through organic destruction, moisture evaporation, and porosity reduction. However, this technology must be demonstrated over a range of waste characteristics, including compositions, chemistries, moistures, and physical characteristics to ensure that it is suitable for hazardous and mixed waste treatment.

Cicero, C.A.; Bickford, D.F. [Westinghouse Savannah River Co., Aiken, SC (United States); Bennert, D.M.; Overcamp, T.J. [Clemson Univ., SC (United States). Dept. of Environmental Systems Engineering

1994-06-17T23:59:59.000Z

443

Fire hazard analysis of Rocky Flats Building 776/777 duct systems  

SciTech Connect

The objective of this analysis is to determine if ventilation ductwork in Building 776/777 will maintain their structural integrity during expected fire conditions as well as standard design fires typically used to ascertain fire resistance ratings. If the analysis shows that ductwork will not maintain structural integrity, the impact of this failure will be determined and analyzed, and alternative solutions recommended. Associated with this analysis is the development of a computer fire model which can be used as an engineering tool in analyzing the effect of fires on ductwork in other areas and buildings.

DiNenno, P.J.; Scheffey, J.L.; Gewain, R.G.; Shanley, J.H. Jr. [Hughes Associates, Inc., Wheaton, MD (United States)

1988-12-01T23:59:59.000Z

444

The National Bureau of Standards Rocky Flats Soil standard reference material  

Science Journals Connector (OSTI)

The National Bureau of Standards (NBS) in collaboration with a number of environmental laboratories of the ICRM has recently issued a soil standard certified for radionuclidic concentrations of activation and fission products and natural radionuclides. Initial disagreements between laboratories of measured concentrations have led to a careful examination of the characteristics of the sample and the radiochemical procedures employed by the participants. A number of assay problems were identified and are discussed. The sample was found to contain an average of approximately 1.8 hot (239+240Pu) particles per bottle of 90 g of soil. A statistical analysis of over seventy measurements was used to determine that the homogeneity of the material excluding hot particles is satisfactory. A sampling method for using this material for quality control of plutonium measurements which minimizes the effect of hot particles is described.

K.G.W. Inn; W.S. Liggett; J.M.R. Hutchinson

1984-01-01T23:59:59.000Z

445

Simulation of Nocturnal Drainage Flows Enhanced by Deep Canyons: The Rocky Flats Case  

Science Journals Connector (OSTI)

The DELTAADREA (discretization with elements of triangle approachatmospheric dispersion of pollutants over irregular terrain) numerical prediction model, developed at the National Center for Scientific Research Demokritos, is specifically ...

Melpomeni Varvayanni; John G. Bartzis; Nicolas Catsaros; Panagiotis Deligiannis; Chuck E. Elderkin

1997-06-01T23:59:59.000Z

446

Stabilization of Rocky Flats Pu-contaminated ash within chemically bonded phosphate ceramics  

Science Journals Connector (OSTI)

A feasibility study was conducted on the use of chemically bonded phosphate ceramics for stabilization of combustion residue of high transuranic (TRU) wastes. Using a matrix of magnesium potassium phosphate formed by the room-temperature reaction of MgO and KH2PO4 solution, we made waste forms that contained 5 wt% Pu to satisfy the requirements of the Waste Isolation Pilot Plant. The waste forms were ceramics whose compression strength was twice that of conventional cement grout and whose connected porosity was ?50% that of cement grout. Both surrogate and actual waste forms displayed high leaching resistance for both hazardous metals and Pu. Hydrogen generation resulting from the radiolytic decomposition of water and organic compounds present in the waste form did not appear to be a significant issue. Pu was present as PuO2 that was physically microencapsulated in the matrix. In the process, pyrophoricity was removed and leaching resistance was enhanced. The high leaching resistance was due to the very low solubility of PuO2 coupled with superior microencapsulation. As a result, the waste forms satisfied the current Safeguard Termination Limit requirement for storage of TRU combustion residues.

A.S. Wagh; R. Strain; S.Y. Jeong; D. Reed; T. Krause; D. Singh

1999-01-01T23:59:59.000Z

447

Production-scale plutonium-neptunium separation and residue recovery at Rocky Flats Plant  

SciTech Connect

An anion exchange process to recover plutonium from plutonium - 0.5% neptunium residues has been investigated on a production scale. The plutonium was effectively recovered and separated from neptunium using Rohm and Haas Amberlite IRA-938 (20 to 50 mesh) macroreticular anion exchange resin. During this process, 58.3 kg of plutonium containing less than 100 g Np/g Pu has been recovered.

Martella, L.L.; Guyer, R.H.; Leak, W.C.; Thomas, R.L. (eds.)

1987-05-26T23:59:59.000Z

448

Colorado State University Extension Contact: Joanne Littlefield  

E-Print Network (OSTI)

Colorado State University Extension Contact: Joanne Littlefield Director, Outreach and Engagement weather situation in Colorado is requiring often quick property and safety decisions; recovery efforts and rapidly shifting conditions along Colorado's Front Range. From food safety issues related to crops

Stephens, Graeme L.

449

WIPP Mine Rescue Team Wins Colorado Competition  

NLE Websites -- All DOE Office Websites (Extended Search)

in five years. The Colorado State Mine Inspector's Office, in conjunction with the Colorado School of Mines, hosted the Western Regional, June 12-14 in Golden, Colorado. The...

450

Colorado Water Courts | Open Energy Information  

Open Energy Info (EERE)

Courts Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Colorado Water Courts Abstract This is the website for Colorado Water Courts. Author Colorado...

451

2013 Annual Planning Summary for the Rocky Mountain Oilfield Testing Center  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2013 and 2014 within the Rocky Mountain Oilfield Testing Center . The Rocky Mountain Oilfield Testing...

452

Investigation of the unconfined flow system at the Rocky Mountain Arsenal, Denver, Colorado  

E-Print Network (OSTI)

Associates. b) Bedrock elevation database, provided by Ebasco Environmental. 2) Developing a methodology to determine unconfined vs confined conditions for wells at the Arsenal. 3) Producing contour maps of quarterly water elevadons for wells reflecting...

Sturdivant, Peter Laurence

1993-01-01T23:59:59.000Z

453

Colorado Climate Winter 1999/2000 Vol. 1, No. 1  

E-Print Network (OSTI)

Colorado Climate Winter 1999/2000 Vol. 1, No. 1 Inside: What Is Climate? 1999 Water Year Review Climate on the Web Drought in Colorado #12;Colorado Climate Center Atmospheric Science Department Colorado ................................................................................................................................... 12 Drought in Colorado

454

University of Colorado, Boulder Computer Science Technical Reports Computer Science  

E-Print Network (OSTI)

University of Colorado, Boulder CU Scholar Computer Science Technical Reports Computer Science-1008-06 Michael Buettner University of Colorado Boulder Gary Yee University of Colorado Boulder Eric Anderson University of Colorado Boulder Richard Han University of Colorado Boulder Follow

Han, Richard Y.

455

Colorado's Hot Springs | Open Energy Information  

Open Energy Info (EERE)

http:crossref.org Citation D. Frazier. 2000. Colorado's Hot Springs. Boulder, Colorado: Pruett Publishing Company. 165p. Retrieved from "http:en.openei.orgw...

456

Colorado Energy Office | Open Energy Information  

Open Energy Info (EERE)

Office Jump to: navigation, search Name: Colorado Energy Office Address: 1580 Logan Street, Suite 100 Place: Denver, CO Zip: 80203 Website: http:www.colorado.govenergy...

457

Colorado DWR GWS-32 | Open Energy Information  

Open Energy Info (EERE)

Reference: Colorado DWR GWS-32 Published Colorado Division of Water Resources, Date Not Provided DOI Not Provided Check for DOI availability: http:crossref.org Citation Retrieved...

458

Colorado DWR GWS-31 | Open Energy Information  

Open Energy Info (EERE)

Reference: Colorado DWR GWS-31 Published Colorado Division of Water Resources, Date Not Provided DOI Not Provided Check for DOI availability: http:crossref.org Citation Retrieved...

459

BLM Colorado State Office | Open Energy Information  

Open Energy Info (EERE)

Colorado State Office Abbreviation: Colorado Address: 2850 Youngfield Street Place: Lakewood, CO Zip: 80215 Phone Number: 303-239-3600 ParentHolding Organization: Bureau of Land...

460

Colorado - Access Permit Application File Review Checklist |...  

Open Energy Info (EERE)

Checklist Jump to: navigation, search OpenEI Reference LibraryAdd to library General: Colorado - Access Permit Application File Review Checklist Author Colorado Department of...

Note: This page contains sample records for the topic "rocky flats colorado" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

First Amendment to Programmatic Agreement for Colorado  

Energy.gov (U.S. Department of Energy (DOE))

First amendment to the programmatic agreement between DOE, the Colorado Governor's Energy Office, and the Colorado State Historic Preservation Office regarding EECBG, SEP and WAP undertakings.

462

Fermilab Today | University of Colorado at Boulder  

NLE Websites -- All DOE Office Websites (Extended Search)

Colorado at Boulder Jan. 2, 2013 NAME: University of Colorado at Boulder HOME TOWN: Boulder, Colo. MASCOT: Buffaloes COLORS: Silver and gold COLLABORATING AT FERMILAB SINCE:...

463

Colorado: Energy Modeling Products Support Energy Efficiency...  

Office of Environmental Management (EM)

Colorado: Energy Modeling Products Support Energy Efficiency Projects Colorado: Energy Modeling Products Support Energy Efficiency Projects May 1, 2014 - 11:04am Addthis Xcel...

464

Golden, Colorado: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Society Registered Energy Companies in Golden, Colorado Ampulse Ampulse Corporation Blue Sun Biodiesel LLC Colorado Fuel Cell Center CFCC Energistic Systems Energy Solutions...

465

Colorado Water Quality Certification General Information | Open...  

Open Energy Info (EERE)

search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Colorado Water Quality Certification General InformationLegal Abstract The Colorado Department of...

466

Resistivity sections, Upper Arkansas River Basin, Colorado |...  

Open Energy Info (EERE)

Conservancy District, and the Colorado Division of Water Resources, Colorado State Engineer. As part of the investigation, surface geophysical electrical resistivity surveys...

467

Rocky Mountain Power - Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rocky Mountain Power - Net Metering Rocky Mountain Power - Net Metering Rocky Mountain Power - Net Metering < Back Eligibility Agricultural Commercial Fed. Government Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Buying & Making Electricity Solar Home Weatherization Wind Program Info State Idaho Program Type Net Metering Provider Rocky Mountain Power Idaho does not have a statewide net-metering policy. However, each of the state's three investor-owned utilities -- Avista Utilities, Idaho Power and Rocky Mountain Power -- has a net-metering tariff on file with the Idaho Public Utilities Commission (PUC). The framework of the utilities' net-metering programs is similar, in that each utility: (1) offers net

468

Rocky Mountain Power - Energy FinAnswer | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rocky Mountain Power - Energy FinAnswer Rocky Mountain Power - Energy FinAnswer Rocky Mountain Power - Energy FinAnswer < Back Eligibility Agricultural Commercial Construction Industrial Savings Category Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Other Maximum Rebate Retrofit: 50% of eligible measure cost Lighting Energy Savings Limit: 50%-75% of savings Program Info State Utah Program Type Utility Rebate Program Rebate Amount 0.12/kWh annual energy savings + 50/kW average monthly on-peak demand savings Provider Rocky Mountain Power Rocky Mountain Power's Energy FinAnswer program provides cash incentives to help its commercial and industrial customers improve the efficiency of their existing facilities and build new facilities that are significantly

469

Clean Economy Network-Rockies | Open Energy Information  

Open Energy Info (EERE)

Network-Rockies Network-Rockies Jump to: navigation, search Name Clean Economy Network-Rockies Place Denver, CO Region Rockies Area Website http://rockies.cleaneconomynet Coordinates 39.7391536°, -104.9847034° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.7391536,"lon":-104.9847034,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

470

City of Colorado Springs, Colorado (Utility Company) | Open Energy  

Open Energy Info (EERE)

Colorado (Utility Company) Colorado (Utility Company) (Redirected from Colorado Springs Utilities) Jump to: navigation, search Name Colorado Springs City of Place Colorado Utility Id 3989 Utility Location Yes Ownership M NERC Location WECC NERC WECC Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes Activity Wholesale Marketing Yes Activity Retail Marketing Yes Activity Bundled Services Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png COMMERCIAL SERVICE - GENERAL (E2C) Commercial

471

The Theoryof Maximally Flat  

E-Print Network (OSTI)

TRANSACTIONSON AUDIO AND ELECTROACOUSTICS, VOL. AU-20, NO. 3, AUGUST 1972 dynamic drag of the voice coil be made as flat as thedesigner'sconstraints permit. II. Theory Let the dc resistance of the voice coil, rl the mechanical re- sistance of the cone suspension, and SIthe suspension stiff- ness or spring

California at Berkeley, University of

472

Microsoft Word - colorado.doc  

Gasoline and Diesel Fuel Update (EIA)

Colorado Colorado NERC Region(s) ....................................................................................................... RFC/WECC Primary Energy Source........................................................................................... Coal Net Summer Capacity (megawatts) ....................................................................... 13,777 30 Electric Utilities ...................................................................................................... 9,114 28 Independent Power Producers & Combined Heat and Power ................................ 4,662 22 Net Generation (megawatthours) ........................................................................... 50,720,792 30

473

Microsoft Word - colorado.doc  

U.S. Energy Information Administration (EIA) Indexed Site

Colorado Colorado NERC Region(s) ....................................................................................................... RFC/WECC Primary Energy Source........................................................................................... Coal Net Summer Capacity (megawatts) ....................................................................... 13,777 30 Electric Utilities ...................................................................................................... 9,114 28 Independent Power Producers & Combined Heat and Power ................................ 4,662 22 Net Generation (megawatthours) ........................................................................... 50,720,792 30

474

Loveland, Colorado June 21, 2008  

E-Print Network (OSTI)

50 cents Loveland, Colorado Saturday June 21, 2008 Getconnectedatwww.reporterherald.com MAPPING summer weather forecasts in Northern Colorado can get a bit repetitive: higher tem- peratures the summer season can hold many surprises -- slow- moving rainstorms that cause flash floods, wildfires

475

Market Statistics Northern Colorado Region  

E-Print Network (OSTI)

Market Statistics RE Northern Colorado Region #12;©2013 Everitt Real Estate Center, All Rights. The EREC Market Statistics for the Northern Colorado region details historical closing and inventory trends. The EREC Market Statistics report is available for download at http

476

Colorado | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 29, 2011 July 29, 2011 News Release: DOE to Host Public Scoping Meetings on Uranium Leasing PEIS GRAND JUNCTION, Colo. - The U.S. Department of Energy is hosting public scoping meetings to invite comments on the scope of the Draft Uranium Leasing Program Programmatic Environmental Impact Statement. The meetings will be held at the locations and dates listed below and will begin at 6:30 p.m. with an opportunity to sign-in to provide oral comments. A formal presentation by DOE officials will start at 7:00 p.m. followed by public comments starting at 7:15 p.m. July 27, 2011 CX-006297: Categorical Exclusion Determination Colorado-City-Fort Collins CX(s) Applied: A1, A9, B1.32, B2.5, B3.6, B5.1 Date: 07/27/2011 Location(s): Fort Collins, Colorado Office(s): Energy Efficiency and Renewable Energy

477

This article was downloaded by:[University of Colorado Libraries] [University of Colorado Libraries  

E-Print Network (OSTI)

This article was downloaded by:[University of Colorado Libraries] [University of Colorado Libraries. © Taylor and Francis 2007 #12;DownloadedBy:[UniversityofColoradoLibraries]At:23:094June2007 A UNIFIED, University of Colorado at Boulder, Boulder, Colorado, USA This article presents a unified model

Mohseni, Kamran

478

Colorado Supreme Court Opinions || April 8, 2002 Colorado Supreme Court --April 8, 2002  

E-Print Network (OSTI)

Colorado Supreme Court Opinions || April 8, 2002 Colorado Supreme Court -- April 8, 2002 No. 01SA. Kornfeld Denver, Colorado Attorneys for Plaintiff-Appellant Nathan, Bremer, Dumm & Myers, P.C. J. Andrew Nathan Paige K. Hogan SUPREME COURT, STATE OF COLORADO Two East 14th Avenue Denver, Colorado 80203

Shamos, Michael I.

479

Colorado ClassicsColorado Classics --Our Legendary StormsOur Legendary Storms  

E-Print Network (OSTI)

;1997 October · Southeast Colorado blizzard Satellite image of the Western Plains on October 26, 1997. The imageColorado ClassicsColorado Classics -- Our Legendary StormsOur Legendary Storms Nolan J.Nolan J. DoeskenDoesken Colorado Climate Center Colorado State University Presented at 7NEWS Winter Weather Seminar

480

The Colorado Drought ofThe Colorado Drought of 2002 in Perspective2002 in Perspective  

E-Print Network (OSTI)

The Colorado Drought ofThe Colorado Drought of 2002 in Perspective2002 in Perspective Colorado Climate CenterColorado Climate Center NolanNolan DoeskenDoesken and Rogerand Roger PielkePielke,, Sr://climate.atmos.colostate.eduhttp://climate.atmos.colostate.edu #12;Known CharacteristicsKnown Characteristics of Droughtof Drought Drought teases Colorado often

Note: This page contains sample records for the topic "rocky flats colorado" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Categorical Exclusion Determinations: Western Area Power Administration-Rocky Mountain Region  

Energy.gov (U.S. Department of Energy (DOE))

Categorical Exclusion Determinations issued by Western Area Power Administration-Rocky Mountain Region.

482

Colorado Solar Energy Industries Association | Open Energy Information  

Open Energy Info (EERE)

Solar Energy Industries Association Solar Energy Industries Association Name Colorado Solar Energy Industries Association Address 841 Front St. Place Louisville, Colorado Zip 80027 Region Rockies Area Website http://www.coseia.org/ Notes Promote the use of solar energy and conservation to improve the environment and create a sustainable future, CO state chapter of SEIA Coordinates 39.978565°, -105.131049° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.978565,"lon":-105.131049,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

483

University of Colorado at Boulder Catalog  

E-Print Network (OSTI)

University of Colorado at Boulder Catalog 2007­08 #12;The Catalog The 2007­08 University of Colorado at Boulder Catalog contains a summary of campus facilities, programs, and services; descriptions (plus.colorado.edu/ planner) and the catalog website (www.colorado.edu/catalog), and reviewing

Mojzsis, Stephen J.

484

Colorado Water Institute Annual Technical Report  

E-Print Network (OSTI)

Colorado Water Institute Annual Technical Report FY 2011 Colorado Water Institute Annual Technical Report FY 2011 1 #12;Introduction Water research is more pertinent than ever in Colorado. Whether, the quality and quantity of water becomes essential to every discussion of any human activity. The Colorado

485

ii Colorado Climate Table of Contents  

E-Print Network (OSTI)

#12;ii Colorado Climate Table of Contents Web: http://climate.atmos.colostate.edu Colorado Climate Winter 2001-2002 Vol. 3, No. 1 Why Is the Park Range Colorado's Snowfall Capital? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10 The Cold-Land Processes Field Experiment: North-Central Colorado

486

Colorado Natural Heritage Program Wetland Program Plan  

E-Print Network (OSTI)

Colorado Natural Heritage Program Wetland Program Plan A Vision for Building Comprehensive Wetland Information for the State of Colorado Planning Years 2011­2015 #12;Colorado Natural Heritage Program Wetland Program Plan A Vision for Building Comprehensive Wetland Information for the State of Colorado Planning

487

Colorado Water Institute Annual Technical Report  

E-Print Network (OSTI)

Colorado Water Institute Annual Technical Report FY 2009 Colorado Water Institute Annual Technical Report FY 2009 1 #12;Introduction Water research is more pertinent than ever in Colorado. Whether of Colorado is engaged in long term water supply planning that requires information from the research

488

Colorado Water Institute Annual Technical Report  

E-Print Network (OSTI)

Colorado Water Institute Annual Technical Report FY 2012 Colorado Water Institute Annual Technical Report FY 2012 1 #12;Introduction Colorado Water Institute Annual Report for the period: March 1, 2012 ­ February 28, 2013 Water research is more pertinent than ever in Colorado. Whether the project explores

489

Colorado Water Institute Annual Technical Report  

E-Print Network (OSTI)

Colorado Water Institute Annual Technical Report FY 2013 Colorado Water Institute Annual Technical Report FY 2013 1 #12;Introduction Water research is more important than ever in Colorado. Whether, the quality and quantity of water becomes essential to every discussion of any human activity. The Colorado

490

A History of DROUGHT IN COLORADO  

E-Print Network (OSTI)

A History of DROUGHT IN COLORADO LESSONS LEARNED AND WHAT LIES AHEAD by Thomas B. McKee, Nolan J. Doesken, John Kleist Colorado Climate Center Atmospheric Science Department Colorado State University and Catherine J. Shrier Colorado Water Resources Research Institute in collaboration with William P. Stanton

491

University of Colorado 2001 Activity Report 1  

E-Print Network (OSTI)

University of Colorado 2001 Activity Report 1 Laboratory for Atmospheric and Space Physics