National Library of Energy BETA

Sample records for rocky flats cleanup

  1. Cleanup at Rocky Flats

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    David L. Clark, Los Alamos National Laboratory The Rocky Flats Environmental Technology Site (RFETS) is an environmental cleanup site located about 16 miles northwest of downtown Denver (Fig 1). Two decades of routine monitoring have shown that the environment around RFETS is contaminated with actinide elements (U, Pu, Am) from site operations, [1] and RFETS has been designated by the U.S. Environmental Protection Agency (EPA) as a Superfund cleanup site. Until December 1989, the Rocky Flats

  2. Final Rocky Flats Cleanup Agreement, July 19, 1996 Summary

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rocky Flats Cleanup Agreement State Colorado Agreement Type Federal Facility Agreement Legal Driver(s) CERCLA/RCRA Scope Summary Establish the regulatory framework for achieving the ultimate cleanup of the Rocky Flats Site. Parties DOE; US EPA; The State of Colorado Date 7/19/1996 SCOPE * Establish the regulatory framework for achieving the ultimate cleanup of the Rocky Flats Site. * Ensure that the environmental impacts associated with activities at the Site will continue to be investigated and

  3. Colorado and the Accelerated Cleanup at Rocky Flats

    SciTech Connect (OSTI)

    Spreng, C.

    2007-07-01

    When the Rocky Flats closure project was declared complete in October 2005, it was the largest environmental cleanup to date. Even more impressive, it was ahead of schedule and well under budget. Several factors combined to produce this success including a performance-based contract with financial incentives, development and application of innovative technologies, and a regulator-backed accelerated approach to the cleanup process. The factor in this success in which the State of Colorado had the largest role was in developing and enforcing the Rocky Flats Cleanup Agreement. In compliance with this agreement, cleanup was accomplished by means of multiple interim actions that led to a comprehensive final decision at the end. A key element that allowed the accelerated cleanup was constant consultation among DOE, its contractor, and the regulators plus collaboration with stakeholders. (authors)

  4. Rocky Flats Cleanup Agreement implementation successes and challenges

    SciTech Connect (OSTI)

    Shelton, D.C.

    1997-02-01

    On July 19, 1996 the US Department of Energy (DOE), State of Colorado (CDPHE), and US Environmental Protection Agency (EPA) entered into an agreement called the Rocky Flats Cleanup Agreement (RFCA) for the cleanup and closure of the Rocky Flats Environmental Technology Site (RFETS or Rocky Flats). Major elements of the agreement include: an Integrated Site-Wide Baseline; up to twelve significant enforceable milestones per year; agreed upon soil and water action levels and standards for cleanup; open space as the likely foreseeable land use; the plutonium and TRU waste removed by 2015; streamlined regulatory process; agreement with the Defense Nuclear Facilities Safety Board (DNFSB) to coordinate activities; and a risk reduction focus. Successful implementation of RFCA requires a substantial effort by the parties to change their way of thinking about RFETS and meet the deliverables and commitments. Substantial progress toward Site closure through the implementation of RFCA has been accomplished in the short time since the signing, yet much remains to be done. Much can be learned from the Rocky Flats experience by other facilities in similar situations.

  5. DOE Certifies Rocky Flats Cleanup "Complete" | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    as an example for the other similar projects around the country." Between 1951 and 1989, Rocky Flats produced the trigger mechanism for nearly every nuclear weapon built in...

  6. Rocky flats teams forming

    SciTech Connect (OSTI)

    1994-08-01

    Bidding teams are shaping up to go after the $3.5-billion, five-year contract to manage ongoing operations and cleanup of the US Dept. of Energy`s Rocky Flats nuclear weapon plant near Denver.

  7. Rocky Flats Overview

    Office of Energy Efficiency and Renewable Energy (EERE)

    At the August 20, 2014 NNMCAB Site Tour Scott Surovchak DOE, Provided Information on Activities that Took Place on the Rocky Flats Site. Information on the Clean-up Process was Also Given.

  8. DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project Management Institute

    Broader source: Energy.gov [DOE]

    WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that the Project Management Institute (PMI) has awarded its 2006 Project of the Year to DOE's Rocky Flats Environmental...

  9. THE ROLE OF LAND USE IN ENVIRONMENTAL DECISION MAKING AT THREE DOE MEGA-CLEANUP SITES FERNALD & ROCKY FLATS & MOUND

    SciTech Connect (OSTI)

    JEWETT MA

    2011-01-14

    This paper explores the role that future land use decisions have played in the establishment of cost-effective cleanup objectives and the setting of environmental media cleanup levels for the three major U.S. Department of Energy (DOE) sites for which cleanup has now been successfully completed: the Rocky Flats, Mound, and Fernald Closure Sites. At each site, there are distinct consensus-building histories throughout the following four phases: (1) the facility shut-down and site investigation phase, which took place at the completion of their Cold War nuclear-material production missions; (2) the decision-making phase, whereby stakeholder and regulatory-agency consensus was achieved for the future land-use-based environmental decisions confronting the sites; (3) the remedy selection phase, whereby appropriate remedial actions were identified to achieve the future land-use-based decisions; and (4) the implementation phase, whereby the selected remedial actions for these high-profile sites were implemented and successfully closed out. At each of the three projects, there were strained relationships and distrust between the local community and the DOE as a result of site contamination and potential health effects to the workers and local residents. To engage citizens and interested stakeholder groups - particularly in the role of final land use in the decision-making process, the site management teams at each respective site developed new public-participation strategies to open stakeholder communication channels with site leadership, technical staff, and the regulatory agencies. This action proved invaluable to the success of the projects and reaching consensus on appropriate levels of cleanup. With the implementation of the cleanup remedies now complete, each of the three DOE sites have become models for future environmental-remediation projects and associated decision making.

  10. Independent Oversight Review, Rocky Flats Environmental Technology...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rocky Flats Environmental Technology Site - March 2000 Independent Oversight Review, Rocky Flats Environmental Technology Site - March 2000 March 2000 Review of the Rocky Flats...

  11. Cleanup levels for Am-241, Pu-239, U-234, U-235 & U-238 in soils at the Rocky Flats Environmental Technology Site

    SciTech Connect (OSTI)

    Roberts, R.; Colby, B.; Brooks, L.; Slaten, S.

    1997-07-03

    This presentation briefly outlines a cleanup program at a Rocky Flats site through viewgraphs and an executive summary. Exposure pathway analyses to be performed are identified, and decontamination levels are listed for open space and office worker exposure areas. The executive summary very briefly describes the technical approach, RESRAD computer code to be used for analyses, recommendations for exposure levels, and application of action levels to multiple radionuclide contamination. Determination of action levels for surface and subsurface soils, based on radiation doses, is discussed. 1 tab.

  12. Final Transuranic Waste Shipment Leaves Rocky Flats | Department of Energy

    Energy Savers [EERE]

    Transuranic Waste Shipment Leaves Rocky Flats Final Transuranic Waste Shipment Leaves Rocky Flats April 19, 2005 - 12:23pm Addthis Cleanup Ahead of Schedule, On Track to Save Taxpayers Billions GOLDEN, CO. - A major environmental victory was achieved at the Rocky Flats Site in Golden, Colo., today when the final remaining shipment of radioactive, transuranic (TRU) waste left the property on a truck bound for an underground waste repository in New Mexico. This major milestone is another step

  13. Rocky Flats Compliance Program; Technology summary

    SciTech Connect (OSTI)

    1994-02-01

    The Department of Energy (DOE) established the Office of Technology Development (EM-50) (OTD) as an element of Environmental Restoration and Waste Management (EM) in November 1989. The primary objective of the Office of Technology Development, Rocky Flats Compliance Program (RFCP), is to develop altemative treatment technologies for mixed low-level waste (wastes containing both hazardous and radioactive components) to use in bringing the Rocky Flats Plant (RFP) into compliance with Federal and state regulations and agreements. Approximately 48,000 cubic feet of untreated low-level mixed waste, for which treatment has not been specified, are stored at the RFP. The cleanup of the Rocky Flats site is driven by agreements between DOE, the Environmental Protection Agency (EPA), and the Colorado Department of Health (CDH). Under these agreements, a Comprehensive Treatment and Management Plan (CTMP) was drafted to outline the mechanisms by which RFP will achieve compliance with the regulations and agreements. This document describes DOE`s strategy to treat low-level mixed waste to meet Land Disposal Restrictions and sets specific milestones related to the regulatory aspects of technology development. These milestones detail schedules for the development of technologies to treat all of the mixed wastes at the RFP. Under the Federal Facilities Compliance Act (FFCA), the CTMP has been incorporated into Rocky Flats Plant Conceptual Site Treatment Plan (CSTP). The CSTP will become the Rocky Flats Plant site Treatment Plan in 1995 and will supersede the CTMP.

  14. Independent Oversight Special Review, Rocky Flats Closure Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rocky Flats Closure Project Site - April 2001 Independent Oversight Special Review, Rocky Flats Closure Project Site - April 2001 April 2001 Special Review of the Rocky Flats...

  15. ROCKY FLATS CLOSURE PROJECT EM, AUG 2006 | Department of Energy

    Energy Savers [EERE]

    AUG 2006 ROCKY FLATS CLOSURE PROJECT EM, AUG 2006 PDF icon Rocky Flats Closure Project-Lessons Learned-August 2006.pdf More Documents & Publications Rocky Flats Overview...

  16. DOE - Office of Legacy Management -- Rocky Flats External Resources

    Office of Legacy Management (LM)

    External Resources Rocky Flats Site, Colorado External Resources Rocky Flats Stewardship Council Disclaimer Rocky Flats Cold War Museum Disclaimer U.S. Fish and Wildlife Service Rocky Flats National Wildlife Refuge Disclaimer Last Updated: 5/1/2013

  17. Residue management at Rocky Flats

    SciTech Connect (OSTI)

    Olencz, J.

    1995-12-31

    Past plutonium production and manufacturing operations conducted at the Rocky Flats Environmental Technology Site (RFETS) produced a variety of plutonium-contaminated by-product materials. Residues are a category of these materials and were categorized as {open_quotes}materials in-process{close_quotes} to be recovered due to their inherent plutonium concentrations. In 1989 all RFETS plutonium production and manufacturing operations were curtailed. This report describes the management of plutonium bearing liquid and solid wastes.

  18. Rocky Flats Environmental Technology Site Archived Soil & Groundwater...

    Office of Environmental Management (EM)

    Rocky Flats Environmental Technology Site Archived Soil & Groundwater Master Reports Rocky Flats Environmental Technology Site Archived Soil & Groundwater Master Reports Rocky...

  19. Closing Rocky Flats by 2006

    SciTech Connect (OSTI)

    Tuor, N. R.; Schubert, A. L.

    2002-02-26

    Safely accelerating the closure of Rocky Flats to 2006 is a goal shared by many: the State of Colorado, the communities surrounding the site, the U.S. Congress, the Department of Energy, Kaiser-Hill and its team of subcontractors, the site's employees, and taxpayers across the country. On June 30, 2000, Kaiser-Hill (KH) submitted to the Department of Energy (DOE), KH's plan to achieve closure of Rocky Flats by December 15, 2006, for a remaining cost of $3.96 billion (February 1, 2000, to December 15, 2006). The Closure Project Baseline (CPB) is the detailed project plan for accomplishing this ambitious closure goal. This paper will provide a status report on the progress being made toward the closure goal. This paper will: provide a summary of the closure contract completion criteria; give the current cost and schedule variance of the project and the status of key activities; detail important accomplishments of the past year; and discuss the challenges ahead.

  20. ROCKY FLATS CLOSURE PROJECT EM, AUG 2006 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ROCKY FLATS CLOSURE PROJECT EM, AUG 2006 ROCKY FLATS CLOSURE PROJECT EM, AUG 2006 PDF icon Rocky Flats Closure Project-Lessons Learned-August 2006.pdf More Documents & Publications Rocky Flats Overview Long-Term Surveillance and Maintenance at Rocky Flats: Early Experiences and Lessons Learned WC_1995_010__PETITION_FOR_CLASS_WAIVER_for_KAISER_HILL_CO_In.pdf

  1. Revegetation of the Rocky Flats Site | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Revegetation of the Rocky Flats Site Revegetation of the Rocky Flats Site Revegetation of the Rocky Flats, Colorado Site PDF icon Revegetation of the Rocky Flats Site More Documents & Publications Landfill Cover Revegetation at the Rocky Flats Environmental Technology Site Mined Land Reclamation on DOE's Uranium Lease Tracts, Southwestern Colorado Erosion Control and Revegetation at DOE's Lowman Disposal Site, Lowman, Idaho

  2. Rocky Flats Environmental Technology Site Archived Soil & Groundwater

    Office of Environmental Management (EM)

    Master Reports | Department of Energy Rocky Flats Environmental Technology Site Archived Soil & Groundwater Master Reports Rocky Flats Environmental Technology Site Archived Soil & Groundwater Master Reports Rocky Flats Environmental Technology Site Archived Soil & Groundwater Master Reports PDF icon Rocky Flats Environmental Technology Site - 881 Hillside Drum Storage Area PDF icon Rocky Flats Environmental Technology Site - 903 Pad PDF icon Rocky Flats Environmental Technology

  3. Landfill Cover Revegetation at the Rocky Flats Environmental Technology

    Office of Environmental Management (EM)

    Site | Department of Energy Landfill Cover Revegetation at the Rocky Flats Environmental Technology Site Landfill Cover Revegetation at the Rocky Flats Environmental Technology Site Landfill Cover Revegetation at the Rocky Flats Environmental Technology Site PDF icon Landfill Cover Revegetation at the Rocky Flats Environmental Technology Site More Documents & Publications Revegetation of the Rocky Flats Site Smooth Brome Monitoring at Rocky Flats-2005 Results Monitoring the Performance

  4. LM Records Handling System (LMRHS01) - Rocky Flats Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rocky Flats Environmental Records Database, Office of Legacy Management LM Records Handling System (LMRHS01) - Rocky Flats Environmental Records Database, Office of Legacy...

  5. Preliminary Notice of Violation , Rocky Flats Environmental Technology...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Violation , Rocky Flats Environmental Technology Site - EA-96-05 Preliminary Notice of Violation , Rocky Flats Environmental Technology Site - EA-96-05 October 7, 1996 Preliminary...

  6. Rocky Flats ash test procedure (sludge stabilization)

    SciTech Connect (OSTI)

    Winstead, M.L.

    1995-09-14

    Rocky Flats Ash items have been identified as the next set of materials to be stabilized. This test is being run to determine charge sizes and soak times to completely stabilize the Rocky Flats Ash items. The information gathered will be used to generate the heating rampup cycle for stabilization. This test will also gain information on the effects of the glovebox atmosphere (moisture) on the stabilized material. This document provides instructions for testing Rocky Flats Ash in the HC-21C muffle furnace process.

  7. Rocky Flats beryllium health surveillance

    SciTech Connect (OSTI)

    Stange, A.W.; Furman, F.J.; Hilmas, D.E.

    1996-10-01

    The Rocky Flats Beryllium Health Surveillance Program (BHSP), initiated in June 1991, was designed to provide medical surveillance for current and former employees exposed to beryllium. The BHSP identifies individuals who have developed beryllium sensitivity using the beryllium lymphocyte proliferation test (BeLPT). A detailed medical evaluation to determine the prevalence of chronic beryllium disease (CBD) is offered to individuals identified as beryllium sensitized or to those who have chest X-ray changes suggestive of CBD. The BHSP has identified 27 cases of CBD and another 74 cases of beryllium sensitization out of 4268 individuals tested. The distribution of BeLPT values for normal, sensitized, and CBD-identified individuals is described. Based on the information collected during the first 3 1/3 years of the BHSP, the BeLPT is the most effective means for the early identification of beryllium-sensitized individuals and to identify individuals who may have CBD. The need for BeLPT retesting is demonstrated through the identification of beryllium sensitization in individuals who previously tested normal. Posterior/anterior chest X-rays were not effective in the identification of CBD. 12 refs., 8 tabs.

  8. Rocky Flats Ash test procedure (sludge stabilization)

    SciTech Connect (OSTI)

    Funston, G.A.

    1995-06-14

    Rocky Flats Ash items have been identified as the next set of materials to be stabilized. This test is being run to determine charge sizes and soak times to completely stabilize the Rocky Flats Ash items. The information gathered will be used to generate the heating rampup cycle for stabilization. The test will provide information to determine charge sizes, soak times and mesh screen sizes (if available at time of test) for stabilization of Rocky Flats Ash items to be processed in the HC-21C Muffle Furnace Process. Once the charge size and soak times have been established, a program for the temperature controller of the HC-21C Muffle Furnace process will be generated for processing Rocky Flats Ash.

  9. DOE - Office of Legacy Management -- Rocky Flats Regulatory Documents

    Office of Legacy Management (LM)

    Regulatory Documents Rocky Flats Site, Colorado Regulatory Documents All documents are Adobe Acrobat files. pdf_icon Notification that GS01 is no longer an RFLMA Point of Compliance (POC) Third Five-Year Review Report for the Rocky Flats Site Rocky Flats Legacy Management Agreement Environmental Covenant, November 14, 2011 Corrective Action Decision/Record of Decision Amendment for Rocky Flats Plant (USDOE) Central Operable Unit Proposed Plan for the Rocky Flats CAD/ROD Amendment (June 2011)

  10. DOE - Office of Legacy Management -- Rocky Flats SOG

    Office of Legacy Management (LM)

    SOG Rocky Flats Site, Colorado Rocky Flats, Colorado, Site Operations Guide All documents are Adobe Acrobat files. pdf_icon Site Operations Guide Appendixes Appendix A: Annual Site Inspection Checklist Appendix B: Example Contact Record Appendix C: Rocky Flats Site Soil Disturbance Evaluation Procedure Appendix D: Site-Specific Checklist Appendix E: Rocky Flats, Colorado, Site Erosion Control Monitoring and Maintenance Inspection Procedure Appendix F: Erosion Control Plan for Rocky Flats

  11. Solid waste recycling programs at Rocky Flats

    SciTech Connect (OSTI)

    Millette, R.L.; Blackman, T.E.; Shepard, M.D.

    1994-12-31

    The Rocky Flats (RFP) recycling programs for solid waste materials have been in place for over ten years. Within the last three years, the programs were centralized under the direction of the Rocky Flats Waste Minimization department, with the assistance of various plant organizations (e.g., Trucking, Building Services, Regulated Waste Operations, property Utilization and Disposal and Security). Waste Minimization designs collection and transportation systems for recyclable materials and evaluates recycling markets for opportunities to add new commodities to the existing programs. The Waste Minimization department also promotes employee participation in the Rocky Flats Recycling Programs, and collects all recycling data for publication. A description of the program status as of January 1994 is given.

  12. Issues evaluation process at Rocky Flats Plant

    SciTech Connect (OSTI)

    Smith, L.C.

    1992-04-16

    This report describes the issues evaluation process for Rocky Flats Plant as established in July 1990. The issues evaluation process was initiated February 27, 1990 with a Charter and Process Overview for short-term implementation. The purpose of the process was to determine the projects required for completion before the Phased Resumption of Plutonium Operations. To determine which projects were required, the issues evaluation process and emphasized risk mitigation, based on a ranking system. The purpose of this report is to document the early design of the issues evaluation process to record the methodologies used that continue as the basis for the ongoing Issues Management Program at Rocky Flats Plant.

  13. Chemical tracking at the Rocky Flats Plant

    SciTech Connect (OSTI)

    Costain, D.B.

    1994-04-01

    EG&G Rocky Flats, Inc., has developed a chemical tracking system to support compliance with the Emergency Planning and community Right-to-Know Act (EPCRA) at the Rocky Flats Plant. This system, referred to as the EPCRA Chemical Control system (ECCS), uses bar code technology to uniquely identify and track the receipt, distribution, and use of chemicals. Chemical inventories are conducted using hand-held electronic scanners to update a site wide chemical database on a VAX 6000 computer. Information from the ECCS supports preparation of the EPCRA Tier II and Form R reports on chemical storage and use.

  14. Cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cleanup

  15. Smooth Brome Monitoring at Rocky Flats-2005 Results | Department of

    Energy Savers [EERE]

    Energy Smooth Brome Monitoring at Rocky Flats-2005 Results Smooth Brome Monitoring at Rocky Flats-2005 Results Smooth Brome Monitoring at Rocky Flats-2005 Results PDF icon Smooth Brome Monitoring at Rocky Flats-2005 Results More Documents & Publications Project Reports for Northwest Alaska Native Association (NANA) Regional Corporation - 2007 Project EIS-0285-SA-70: Supplement Analysis EIS-0285-SA-71: Supplement Analysis

  16. Independent Oversight Review, Rocky Flats Environmental Technology Site -

    Office of Environmental Management (EM)

    March 2000 | Department of Energy Rocky Flats Environmental Technology Site - March 2000 Independent Oversight Review, Rocky Flats Environmental Technology Site - March 2000 March 2000 Review of the Rocky Flats Environmental Technology Site Transportation Emergency Management Program This report provides the results of an independent review of the Transportation Emergency Management Program at the Department of Energy's Rocky Flats Environmental Technology Site that was conducted by the

  17. Independent Oversight Special Review, Rocky Flats Closure Project Site -

    Office of Environmental Management (EM)

    April 2001 | Department of Energy Rocky Flats Closure Project Site - April 2001 Independent Oversight Special Review, Rocky Flats Closure Project Site - April 2001 April 2001 Special Review of the Rocky Flats Closure Project Site This report provides the results of a Special Review at the Rocky Flats Closure Project that was performed U.S. Department of Energy's (DOE) Office of Independent Environment, Safety, and Health Oversight. The Special Review was conducted in February and March 2001

  18. LM Records Handling System (LMRHS01) - Rocky Flats Environmental Records

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Database, Office of Legacy Management | Department of Energy Rocky Flats Environmental Records Database, Office of Legacy Management LM Records Handling System (LMRHS01) - Rocky Flats Environmental Records Database, Office of Legacy Management LM Records Handling System (LMRHS01) - Rocky Flats Environmental Records Database, Office of Legacy Management PDF icon LM Records Handling System (LMRHS01) - Rocky Flats Environmental Records Database, Office of Legacy Management More Documents &

  19. Release fractions for Rocky Flats specific accidents

    SciTech Connect (OSTI)

    Weiss, R.C.

    1992-09-01

    As Rocky Flats and other DOE facilities begin the transition process towards decommissioning, the nature of the scenarios to be studied in safety analysis will change. Whereas the previous emphasis in safety accidents related to production, now the emphasis is shifting to accidents related tc decommissioning and waste management. Accident scenarios of concern at Rocky Flats now include situations of a different nature and different scale than are represented by most of the existing experimental accident data. This presentation will discuss approaches@to use for applying the existing body of release fraction data to this new emphasis. Mention will also be made of ongoing efforts to produce new data and improve the understanding of physical mechanisms involved.

  20. Immobilization of Rocky Flats graphite fines residues

    SciTech Connect (OSTI)

    Rudisill, T.S.; Marra, J.C.; Peeler, D.K.

    1999-07-01

    The Savannah River Technology Center (SRTC) is developing an immobilization process for graphite fines residues generated during nuclear materials production activities at the Rocky Flats Environmental Technology Site (Rocky Flats). The continued storage of this material has been identified as an item of concern. The residue was generated during the cleaning of graphite casting molds and potentially contains reactive plutonium metal. The average residue composition is 73 wt% graphite, 15 wt% calcium fluoride (CaF{sub 2}), and 12 wt% plutonium oxide (PuO{sub 2}). Approximately 950 kg of this material are currently stored at Rocky Flats. The strategy of the immobilization process is to microencapsulate the residue by mixing with a sodium borosilicate (NBS) glass frit and heating at nominally 700 C. The resulting waste form would be sent to the Waste Isolation Pilot Plant (WIPP) for disposal. Since the PuO{sub 2} concentration in the residue averages 12 wt%, the immobilization process was required to meet the intent of safeguards termination criteria by limiting plutonium recoverability based on a test developed by Rocky Flats. The test required a plutonium recovery of less than 4 g/kg of waste form when a sample was leached using a nitric acid/CaF{sub 2} dissolution flowsheet. Immobilization experiments were performed using simulated graphite fines with cerium oxide (CeO{sub 2}) as a surrogate for PuO{sub 2} and with actual graphite fines residues. Small-scale surrogate experiments demonstrated that a 4:1 frit to residue ratio was adequate to prevent recovery of greater than 4 g/kg of cerium from simulated waste forms. Additional experiments investigated the impact of varying concentrations of CaF{sub 2} and the temperature/heating time cycle on the cerium recovery. Optimal processing conditions developed during these experiments were subsequently demonstrated at full-scale with surrogate materials and on a smaller scale using actual graphite fines.

  1. Status Update: Closing Rocky Flats by 2006

    SciTech Connect (OSTI)

    Tuor, N.; Schubert, A.

    2003-02-25

    Safely closing Rocky Flats by December 2006 is a goal shared by many: the State of Colorado, the communities surrounding the site, the U.S. Congress, the Department of Energy (DOE), Kaiser-Hill and its team of subcontractors, the site's employees and taxpayers across the country. This paper will: provide a status of the Closure Project to date; describe important accomplishments of the past year; describe some of the closure-enhancing technologies enabling acceleration; and discuss the remaining challenges ahead.

  2. Microwave solidification development for Rocky Flats waste

    SciTech Connect (OSTI)

    Dixon, D.; Erle, R.; Eschen, V.

    1994-04-01

    The Microwave Engineering Team at the Rocky Flats Plant has developed a production-scale system for the treatment of hazardous, radioactive, and mixed wastes using microwave energy. The system produces a vitreous final form which meets the acceptance criteria for shipment and disposal. The technology also has potential for application on various other waste streams from the public and private sectors. Technology transfer opportunities are being identified and pursued for commercialization of the microwave solidification technology.

  3. Basic TRUEX process for Rocky Flats Plant

    SciTech Connect (OSTI)

    Leonard, R.A.; Chamberlain, D.B.; Dow, J.A.; Farley, S.E.; Nunez, L.; Regalbuto, M.C.; Vandegrift, G.F.

    1994-08-01

    The Generic TRUEX Model was used to develop a TRUEX process flowsheet for recovering the transuranics (Pu, Am) from a nitrate waste stream at Rocky Flats Plant. The process was designed so that it is relatively insensitive to changes in process feed concentrations and flow rates. Related issues are considered, including solvent losses, feed analysis requirements, safety, and interaction with an evaporator system for nitric acid recycle.

  4. Long-Term Surveillance and Maintenance at Rocky Flats: Early Experiences and Lessons Learned

    SciTech Connect (OSTI)

    Surovchak, S.; Kaiser, L.; DiSalvo, R.; Boylan, J.; Squibb, G.; Nelson, J.; Darr, B.; Hanson, M.

    2008-07-01

    The U.S. Department of Energy's (DOE's) Rocky Flats Site was established in 1951 as part of the United States' nationwide nuclear weapons complex to manufacture nuclear weapons components. In 1992 weapons production halted, and the Rocky Flats mission changed to include environmental investigations, cleanup, and site closure. In October 2005, DOE and its contractor completed an accelerated 10-year, $7 billion cleanup of chemical and radiological contamination left from nearly 50 years of production. The cleanup required the decommissioning, decontamination, demolition, and removal of more than 800 structures; removal of more than 500,000 cubic meters of low-level radioactive waste; and remediation of more than 360 potentially contaminated environmental sites. The final remedy for the site was selected in September 2006 and included institutional controls, physical controls, and continued monitoring for the former industrial portion of the site. The remainder of the site, which served as a buffer zone surrounding the former industrial area, was transferred to the U.S. Fish and Wildlife Service in July 2007 for a national wildlife refuge. DOE's Office of Legacy Management is responsible for the long-term surveillance and maintenance of Rocky Flats, which includes remedy implementation activities and general site maintenance. Several factors have complicated the transition from closure to post-closure at Rocky Flats. The early experiences associated with the two years since the physical cleanup and closure work were completed have led to several valuable lessons learned. (authors)

  5. Repackaging Rocky Flats Legacy Transuranic Waste

    SciTech Connect (OSTI)

    McTaggart, Jerri Lynne

    2008-01-15

    Repackaging legacy Transuranic (TRU), Transuranic Mixed (TRM), Low Level Waste (LLW), and Low Level Mixed (LLM) waste requires good characterization skills and the ability to adapt to less than ideal conditions. Repackaging legacy waste in a facility that is not undergoing Decontamination and Decommission (D and D) is optimum. However, repackaging any waste in a D and D facility, under cold and dark conditions, can be difficult. Cold and dark conditions are when the heating and air conditioning are no longer in service and the lighting consists of strands of lights hung throughout each of the rooms. Working under these conditions adds an additional level of stress and danger that must be addressed. The use of glovebags was very useful at Rocky Flats during the D and D of many buildings. Glovebags can be adapted for many different types of wastes and unusual conditions. Repackaging of legacy TRU waste, in a D and D facility, can be accomplished safely and cost effectively with the use of glovebags. In conclusion: the use of glovebags to repackage legacy TRU, TRM, LLW, or LLM waste was done safely and cost effectively at Rocky Flats. The cost of using glovebags was minimal. Glovebags are easily adaptable to whatever the waste configuration is. The use of glovebags, for repackaging of Legacy waste, allows D and D efforts to stay on schedule and on task. Without the use of glovebags, additional gloveboxes would have been required at Rocky Flats. Larger items, such as the HEPA filters, would have required the construction of a new large item repackaging glovebox. Repackaging in glovebags allows the freedom to either locate the glovebag by the waste or locate the glovebag in a place that least impacts D and D efforts. The use of glovebags allowed numerous configurations of waste to be repackaged without the use of gloveboxes. During the D and D of the Rocky Flats facility, which was in a cold and dark stage, D and D work was not impacted by the repackaging activity. Glovebags work well in facilities that are in the process of D and D or still in full operations because glovebags are very safe and cost effective.

  6. EIS-0276: Rocky Flats Plutonium Storage, Golden, Colorado

    Broader source: Energy.gov [DOE]

    This EIS analyzes DOE's proposed action to provide safe interim storage of approximately 10 metric tons of plutonium at the Rocky Flats Environmental Technology Site (RFETS).

  7. Unique process combination decontaminates mixed wastewater at Rocky Flats

    SciTech Connect (OSTI)

    Kelso, William J.; Cirillo, J. Russ

    1999-08-01

    This paper describes the Sitewide Water Treatment Facility (SWTF) used to process environmental remediation wastewaters found at the Rocky Flats Environmental Technology Site.

  8. 2006 Annual Ecology Report for the Rocky Flats Site

    Office of Legacy Management (LM)

    Ecology Report for the Rocky Flats Site Click on the links below to access different portions of the electronic annual report. 2006 Annual Report Sections Diffuse Knapweed...

  9. Disposal of Rocky Flats residues as waste

    SciTech Connect (OSTI)

    Dustin, D.F.; Sendelweck, V.S. . Rocky Flats Plant); Rivera, M.A. )

    1993-01-01

    Work is underway at the Rocky Flats Plant to evaluate alternatives for the removal of a large inventory of plutonium-contaminated residues from the plant. One alternative under consideration is to package the residues as transuranic wastes for ultimate shipment to the Waste Isolation Pilot Plant. Current waste acceptance criteria and transportation regulations require that approximately 1000 cubic yards of residues be repackaged to produce over 20,000 cubic yards of WIPP certified waste. The major regulatory drivers leading to this increase in waste volume are the fissile gram equivalent, surface radiation dose rate, and thermal power limits. In the interest of waste minimization, analyses have been conducted to determine, for each residue type, the controlling criterion leading to the volume increase, the impact of relaxing that criterion on subsequent waste volume, and the means by which rules changes may be implemented. The results of this study have identified the most appropriate changes to be proposed in regulatory requirements in order to minimize the costs of disposing of Rocky Flats residues as transuranic wastes.

  10. Disposal of Rocky Flats residues as waste

    SciTech Connect (OSTI)

    Dustin, D.F.; Sendelweck, V.S.; Rivera, M.A.

    1993-03-01

    Work is underway at the Rocky Flats Plant to evaluate alternatives for the removal of a large inventory of plutonium-contaminated residues from the plant. One alternative under consideration is to package the residues as transuranic wastes for ultimate shipment to the Waste Isolation Pilot Plant. Current waste acceptance criteria and transportation regulations require that approximately 1000 cubic yards of residues be repackaged to produce over 20,000 cubic yards of WIPP certified waste. The major regulatory drivers leading to this increase in waste volume are the fissile gram equivalent, surface radiation dose rate, and thermal power limits. In the interest of waste minimization, analyses have been conducted to determine, for each residue type, the controlling criterion leading to the volume increase, the impact of relaxing that criterion on subsequent waste volume, and the means by which rules changes may be implemented. The results of this study have identified the most appropriate changes to be proposed in regulatory requirements in order to minimize the costs of disposing of Rocky Flats residues as transuranic wastes.

  11. Risk, media, and stigma at Rocky Flats

    SciTech Connect (OSTI)

    Flynn, J.; Peters, E.; Mertz, C.K.; Slovic, P.

    1998-12-01

    Public responses to nuclear technologies are often strongly negative. Events, such as accidents or evidence of unsafe conditions at nuclear facilities, receive extensive and dramatic coverage by the news media. These news stories affect public perceptions of nuclear risks and the geographic areas near nuclear facilities. One result of these perceptions, avoidance behavior, is a form of technological stigma that leads to losses in property values near nuclear facilities. The social amplification of risk is a conceptual framework that attempts to explain how stigma is created through media transmission of information about hazardous places and public perceptions and decisions. This paper examines stigma associated with the US Department of energy`s Rocky Flats facility, a major production plant in the nation`s nuclear weapons complex, located near Denver, Colorado. This study, based upon newspaper analyses and a survey of Denver area residents, finds that the social amplification theory provides a reasonable framework for understanding the events and public responses that took place in regard to Rocky Flats during a 6-year period, beginning with an FBI raid of the facility in 1989.

  12. Immobilization of Rocky Flats Graphite Fines Residues

    SciTech Connect (OSTI)

    Rudisill, T. S.

    1998-11-06

    The Savannah River Technology Center (SRTC) is developing an immobilization process for graphite fines residues generated during nuclear materials production activities at the Rocky Flats Environmental Technology Site (Rocky Flats). The continued storage of this material has been identified as an item of concern. The residue was generated during the cleaning of graphite casting molds and potentially contains reactive plutonium metal. The average residue composition is 73 wt percent graphite, 15 wt percent calcium fluoride (CaF2), and 12 wt percent plutonium oxide (PuO2). Approximately 950 kilograms of this material are currently stored at Rocky Flats. The strategy of the immobilization process is to microencapsulate the residue by mixing with a sodium borosilicate (NBS) glass frit and heating at nominally 700 degrees C. The resulting waste form would be sent to the Waste Isolation Pilot Plant (WIPP) for disposal. Since the PuO2 concentration in the residue averages 12 wt percent, the immobilization process was required to meet the intent of safeguards termination criteria by limiting plutonium recoverability based on a test developed by Rocky Flats. The test required a plutonium recovery of less than 4 g/kg of waste form when a sample was leached using a nitric acid/CaF2 dissolution flowsheet. Immobilization experiments were performed using simulated graphite fines with cerium oxide (CeO2) as a surrogate for PuO2 and with actual graphite fines residues. Small-scale surrogate experiments demonstrated that a 4:1 frit to residue ratio was adequate to prevent recovery of greater than 4 g/kg of cerium from simulated waste forms. Additional experiments investigated the impact of varying concentrations of CaF2 and the temperature/heating time cycle on the cerium recovery. Optimal processing conditions developed during these experiments were subsequently demonstrated at full-scale with surrogate materials and on a smaller scale using actual graphite fines.In general, the recovery of cerium from the full-scale waste forms was higher than for smaller scale experiments. The presence of CaF2 also caused a dramatic increase in cerium recovery not seen in the small-scale experiments. However, the results from experiments with actual graphite fines were encouraging. A 4:1 frit to residue ratio, a temperature of 700 degrees C, and a 2 hr heating time produced waste forms with plutonium recoveries of 4 plus/minus 1 g/kg. With an increase in the frit to residue ratio, waste forms fabricated at this scale should meet the Rocky Flats product specification. The scale-up of the waste form fabrication process to nominally 3 kg is expected to require a 5:1 to 6:1 frit to residue ratio and maintaining the waste form centerline temperature at 700 degrees C for 2 hr.

  13. Comparative risk analysis for the Rocky Flats Plant Integrated Project Planning

    SciTech Connect (OSTI)

    Jones, M.E.; Shain, D.I.

    1994-12-31

    The Rocky Flats Plant is developing a comprehensive planning strategy that will support transition of the Rocky Flats Plant from a nuclear weapons production facility to site cleanup and final disposition. Final disposition of the Rocky Flats Plant materials and contaminants requires consideration of the interrelated nature of sitewide problems, such as material movement and disposition, facility and land use endstates, costs, relative risks to workers and the public, and waste disposition. Comparative Risk Analysis employs both incremental risk and cumulative risk evaluations to compare risk from postulated options or endstates. Comparative Risk Analysis is an analytical tool for the Rocky Flats Plant Integrated Project Planning which can assist a decision-maker in evaluating relative risks among proposed remedial options or future endstates. It addresses the cumulative risks imposed by the Rocky Flats Plant and provides risk information, both human health and ecological, to aid in reducing unnecessary resource and monetary expenditures. Currently, there is no approved methodology that aggregates various risk estimates. Along with academic and field expert review, the Comparative Risk Analysis methodology is being reviewed and refined. A Rocky Flats Plant Risk Assessment Focus Group was established. Stakeholder involvement in the development provides an opportunity to influence the information delivered to a decision-maker. This paper discusses development of the methodology.

  14. Sitewide risk perspectives for the Rocky Flats Environmental Technology Site

    SciTech Connect (OSTI)

    Olinger, S.J.; Foppe, T.L.

    1998-05-01

    The US Department of Energy (DOE) has recently finalized a closure plan (originally called the Ten Year Plan) for closure and environmental cleanup of previous nuclear weapons facilities. The DOE Rocky Flats Field Office has established priorities for risk reduction work to Support closure activities, as well as addressing those hazards associated with storage and management of radioactive materials and hazardous chemicals. To provide information for future National Environmental Policy Act (NEPA) or other regulatory assessments of specific risk reduction projects identified in the Closure Plan, a risk assessment of normal operations and potential accidents was recently prepared to provide an updated baseline of the cumulative impacts to the worker, public and environment due to the Site`s operations, activities, and environmental conditions in light of the Site`s change in mission, and of future closure projects. This paper summarizes the risk assessment approach, results, and conclusions.

  15. Comprehensive appraisal of {sup 239+240}Pu in soils around Rocky Flats, Colorado

    SciTech Connect (OSTI)

    Litaor, M.I.; Allen, L.; Ellerbroek, D.

    1995-12-01

    Plutonium contamination of soils around Rocky Flats Environmental & Technology Site, near Golden, Colorado, resulted from past outdoor storage practices and subsequent remobilization due to inadequate cleanup practices. Until now human-health risk assessment has not been performed because of a lack of sufficient information regarding the spatial extent of {sup 239+240}Pu in soils. The purpose of this work was to elucidate the extent of plutonium contamination in surface soils, and to assess the uncertainty associated with the spatial distribution of {sup 239+240}Pu around Rocky Flats Environmental & Technology Site.

  16. Future is new focus at energy department`s Rocky Flats facility

    SciTech Connect (OSTI)

    Lobsenz, G.

    1993-11-12

    After several years of intensive effort to address radioactive pollution threatening nearby communities, officials at the Energy Department`s Rocky Flats plant now are turning their attention to the site`s plutonium buildings and finding a cleanup challenge of equally daunting proportions. Containing and mopping up off-site soil and water contamination remains the first priority at the Colorado facility, but site environmental managers say the huge volumes of plutonium and associated radioactive waste stored in Rocky Flats` aging building pose increasingly urgent safety concerns.

  17. Rocky Flats Closure Unit Cost Data

    SciTech Connect (OSTI)

    Sanford, P.C.; Skokan, B.

    2007-07-01

    The Rocky Flats Closure Project has completed the process of stabilizing residual nuclear materials, decommissioning nuclear facilities, remediating environmental media and closing the Rocky Flats Site (Site). The project cost approximately $4.1 B and included the decommissioning of over 700 structures including 5 major plutonium facilities and 5 major uranium facilities, shipping over 14,600 cubic meters of transuranic and 565,000 cubic meters of low level radioactive waste, and remediating a 385-acre industrial area and the surrounding land. Actual costs were collected for a large variety of closure activities. These costs can be correlated with metrics associated with the facilities and environmental media to capture cost factors from the project that could be applicable to a variety of other closure projects both within and outside of the Department of Energy's weapons complex. The paper covers four general topics: the process to correlate the actual costs and metrics, an example of the correlated data for one large sub-project, a discussion of the results, and the additional activities that are planned to correlate and make this data available to the public. The process to collect and arrange the project control data of the Closure Project relied on the actual Closure Project cost information. It was used to correlate these actual costs with the metrics for the physical work, such as building area or waste generated, to support the development of parametric cost factors. The example provides cost factors for the Industrial Sites Project. The discussion addresses the strengths and weaknesses of the data, followed by a section identifying future activities to improve and extend the analyses and integrate it within the Department's Environmental Cost Analysis System. (authors)

  18. Comparative risk analysis for the Rocky Flats Plant integrated project planning

    SciTech Connect (OSTI)

    Jones, M.E.; Shain, D.I.

    1994-12-31

    The Rocky Flats Plant is developing, with active stakeholder participation, a comprehensive planning strategy that will support transition of the Rocky Flats Plant from a nuclear weapons production facility to site cleanup and final disposition. Final disposition of the Rocky Flats Plant materials and contaminants requires consideration of the interrelated nature of sitewide problems, such as material movement and disposition, facility and land use endstates, costs, relative risks to workers and the public, and waste disposition. Comparative risk analysis employs both incremental risk and cumulative risk evaluations to compare risks from postulated options or end states. These postulated options or end states can be various remedial alternatives, or future endstate uses of federal land.

  19. Comparative risk analysis for the Rocky Flats Plant integrated project planning

    SciTech Connect (OSTI)

    Jones, M.E.; Shain, D.I.

    1994-05-01

    The Rocky Flats Plant is developing, with active stakeholder a comprehensive planning strategy that will support transition of the Rocky Flats Plant from a nuclear weapons production facility to site cleanup and final disposition. Final disposition of the Rocky Flats Plant materials and contaminants requires consideration of the interrelated nature of sitewide problems, such as material movement and disposition, facility and land use endstates, costs relative risks to workers and the public, and waste disposition. Comparative Risk Analysis employs both incremental risk and cumulative risk evaluations to compare risks from postulated options or endstates. These postulated options or endstates can be various remedial alternatives, or future endstate uses of federal agency land. Currently, there does not exist any approved methodology that aggregates various incremental risk estimates. Comparative Risk Analysis has been developed to aggregate various incremental risk estimates to develop a site cumulative risk estimate. This paper discusses development of the Comparative Risk Analysis methodology, stakeholder participation and lessons learned from these challenges.

  20. Microsoft Word - RockyFlatsPropLR111406.doc

    Office of Environmental Management (EM)

    DATE: November 15, 2006 REPLY TO ATTN OF: IG-40 SUBJECT: Letter Report on "Alleged Waste of Funds Involving Excess Property at Rocky Flats" (INS-L-07-03) TO: Assistant Secretary for Environmental Management This is to advise you of the results of an Office of Inspector General inspection of alleged waste of funds involving excess property at the Department of Energy's (DOE's) Rocky Flats site. BACKGROUND Nuclear weapons production operations at Rocky Flats were discontinued in 1992.

  1. The Critical Mass Laboratory at Rocky Flats

    SciTech Connect (OSTI)

    Rothe, Robert E

    2003-10-15

    The Critical Mass Laboratory (CML) at Rocky Flats northwest of Denver, Colorado, was built in 1964 and commissioned to conduct nuclear experiments on January 28, 1965. It was built to attain more accurate and precise experimental data to ensure nuclear criticality safety at the plant than were previously possible. Prior to its construction, safety data were obtained from long extrapolations of subcritical data (called in situ experiments), calculated parameters from reactor engineering 'models', and a few other imprecise methods. About 1700 critical and critical-approach experiments involving several chemical forms of enriched uranium and plutonium were performed between then and 1988. These experiments included single units and arrays of fissile materials, reflected and 'bare' systems, and configurations with various degrees of moderation, as well as some containing strong neutron absorbers. In 1989, a raid by the Federal Bureau of Investigation (FBI) caused the plant as a whole to focus on 'resumption' instead of further criticality safety experiments. Though either not recognized or not admitted for a few years, that FBI raid did sound the death knell for the CML. The plant's optimistic goal of resumption evolved to one of deactivation, decommissioning, and plantwide demolition during the 1990s. The once-proud CML facility was finally demolished in April of 2002.

  2. Seismic hazard analysis at Rocky Flats Plant

    SciTech Connect (OSTI)

    McGuire, R.K.

    1993-10-01

    A probabilistic seismic hazard analysis is being conducted for the DOE Rocky Flats Plant, Jefferson County, Colorado. This is part of the overall review of the seismic exposure to facilities being conducted by DOE. The study has four major elements. (1) The historical seismicity in Colorado is being reviewed and synthesized to estimate historical rates of earthquake activity in the region of the site. (2) The geologic and tectonic evidence in Colorado and along the Front Range is being reviewed to determine appropriate seismic zones, potentially active faults, and constraints on fault slip rates. (3) Earthquake ground motion equations are being derived based on seismological knowledge of the earth`s crust. Site specific soil amplification factors are also being developed using on-site shear wave velocity measurements. (4) The probability of exceedence of various seismic ground motion levels is being calculated based on the inputs developed on tectonic sources, faults, ground motion, and soil amplification. Deterministic ground motion estimates are also being made. This study is a state-of-the-art analysis of seismic hazard. It incorporates uncertainties in the major aspects governing seismic hazard, and has a documented basis founded on solid data interpretations for the ranges of inputs used. The results will be a valid basis on which to evaluate plant structures, equipment, and components for seismic effects.

  3. Water Monitoring Flume Replaced at the Rocky Flats, Colorado, Site

    Broader source: Energy.gov [DOE]

    In August of this year the U.S. Department of Energy (DOE) Office of Legacy Management (LM) Rocky Flats, site took advantage of an existing water diversion structure that was no longer needed, to...

  4. Rocky Flats Site Expands Solar Power for Treating Groundwater

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) recently added a 6 kilowatt solar photovoltaic system to provide power to operate an enhanced treatment system that removes volatile organic compounds (VOC) from contaminated groundwater at the Rocky Flats, Colorado, Site.

  5. Rocky Flats 100th Shipments Arrives at WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Immediate Release Contact: Karen Lutz, DOE RFFO, 303966-4546 01-08 Jennifer Thompson, Kaiser-Hill, 303966-6285 Kate Foster, Westinghouse TRU Solutions, 505234-7589 Rocky Flats'...

  6. Benchmarking and performance improvement at Rocky Flats Technology Site

    SciTech Connect (OSTI)

    Elliott, C.; Doyle, G.; Featherman, W.L.

    1997-03-01

    The Rocky Flats Environmental Technology Site has initiated a major work process improvement campaign using the tools of formalized benchmarking and streamlining. This paper provides insights into some of the process improvement activities performed at Rocky Flats from November 1995 through December 1996. It reviews the background, motivation, methodology, results, and lessons learned from this ongoing effort. The paper also presents important gains realized through process analysis and improvement including significant cost savings, productivity improvements, and an enhanced understanding of site work processes.

  7. 2006 Annual Ecology Report for the Rocky Flats Site

    Office of Legacy Management (LM)

    Ecology Report for the Rocky Flats Site Click on the links below to access different portions of the electronic annual report. 2006 Annual Report Sections Diffuse Knapweed Biocontrol Monitoring Report Dalmatian Toadflax Monitoring Report High-Value Vegetation Monitoring Report Revegetation Monitoring Report Present and Original Landfill Revegetation Monitoring Report Frog Vocalization Monitoring Report Appendix A (Files below comprise Appendix A for the above listed reports.) Rocky Flats Flora

  8. Rocky Flats, Colorado, Site Quarterly Report of Site Surveillance

    Office of Legacy Management (LM)

    Second Quarter Calendar Year 2013 October 2013 LMS/RFS/S10694 This page intentionally left blank LMS/RFS/S10694 Rocky Flats, Colorado, Site Quarterly Report of Site Surveillance and Maintenance Activities Second Quarter Calendar Year 2013 October 2013 This page intentionally left blank U.S. Department of Energy Rocky Flats Site Quarterly Report of Site Surveillance and Maintenance Activities-2nd Quarter CY 2013 October 2013 Doc. No. S10694 Page i Contents Abbreviations

  9. Review of Beryllium Management Practices at Rocky Flats During Closure

    Energy Savers [EERE]

    Operations | Department of Energy Review of Beryllium Management Practices at Rocky Flats During Closure Operations Review of Beryllium Management Practices at Rocky Flats During Closure Operations Administrative and engineering controls, along with detailed medical and training programs and strict adherence to all characterization, sampling, and work procedures ensured that exposure to beryllium by RFETS employees was minimized to the highest extent possible. PDF icon Review of Beryllium

  10. DOE - Office of Legacy Management -- Rocky Flats Archive

    Office of Legacy Management (LM)

    Archive Rocky Flats Site, Colorado Key Document Archive All documents are Adobe Acrobat files. pdf_icon NEPA - Rocky Flats Surface Water Configuration Environmental Assessment (EA) Site-Specific Uranium Standards Petition Site Surveillance and Maintenance Reports Quarterly Reports 2015 3rd Quarter 2nd Quarter Overview 1st Quarter Overview 2014 3rd Quarter Overview 2nd Quarter Overview 1st Quarter Overview 2013 3rd Quarter Overview 2nd Quarter Overview 1st Quarter Overview 2012 3rd Quarter

  11. Long-Term Surveillance and Maintenance at Rocky Flats: Early Experiences

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Lessons Learned | Department of Energy at Rocky Flats: Early Experiences and Lessons Learned Long-Term Surveillance and Maintenance at Rocky Flats: Early Experiences and Lessons Learned Long-Term Surveillance and Maintenance at Rocky Flats: Early Experiences and Lessons Learned PDF icon Long-Term Surveillance and Maintenance at Rocky Flats: Early Experiences and Lessons Learned More Documents & Publications Rocky Flats Overview EA-1747: Final Environmental Assessment The Use of

  12. Vascular Flora of the Rocky Flats Area, Jefferson County, Colorado, USA |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Vascular Flora of the Rocky Flats Area, Jefferson County, Colorado, USA Vascular Flora of the Rocky Flats Area, Jefferson County, Colorado, USA August 2010 Jody K. Nelson PDF icon Vascular Flora of the Rocky Flats Area, Jefferson County, Colorado, USA More Documents & Publications Smooth Brome Monitoring at Rocky Flats-2005 Results EA-0847: Final Environmental Assessment Landfill Cover Revegetation at the Rocky Flats Environmental Technology Site

  13. Rocky Flats Plant Site Environmental Report, January--December 1990

    SciTech Connect (OSTI)

    Cirrincione, D.A.; Costain, D.B.

    1990-12-31

    This report provides information to the public about the impact of the Rocky Flats Plant on the environment and public health. The report contains a compliance summary, a description of environmental monitoring programs, and radiation dose estimates for the surrounding population for the period January 1 through December 31, 1990. An environmental surveillance program has been ongoing at the Rocky Flats Plant since the 1950s. Early programs focused on radiological impacts to the environment. The current program examines potential impacts to air, surface water, groundwater, and soils from radiological and nonradiological sources. Environmental operations at Rocky Flats Plant are under the jurisdiction of several local, state, and federal agencies, most notably the Colorado Department of Health, Environmental Protection Agency, and Department of Energy. A variety of reports are prepared at different intervals for these and other agencies in addition to the annual environmental report.

  14. The marriage of RCRA and CERCLA at the Rocky Flats Environmental Technology Site

    SciTech Connect (OSTI)

    Shelton, D.C.; Brooks, L.M.

    1998-11-01

    A key goal of the Rocky Flats Cleanup Agreement (RFCA) signed in July of 1996 was to provide a seamless marriage of the Resource Conservation and Recovery Act (RCRA) (and other media specific programs) and the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) and the implementing agencies of each. This paper examines the two years since the signing of RFCA and identifies the successes, failures, and stresses of the marriage. RFCA has provided an excellent vehicle for regulatory and substantive progress at the Department of Energy`s Rocky Flats facility. The key for a fully successful marriage is to build on the accomplishments to date and to continually improve the internal and external systems and relationships. To date, the parties can be proud of both the substantial accomplishment of substantive environmental work and the regulatory systems that have enabled the work.

  15. Hydrogeologic characterization report for the Rocky Flats environmental technology site

    SciTech Connect (OSTI)

    Reeder, D.C.; Burcar, S.; Smith, R.

    1996-12-31

    The Denver groundwater basin encompasses approximately 6,700 square miles, extending east from the Front Range of the Rocky Mountains. This structural basin contains four Cretaceous bedrock aquifers overlain by a regional Quaternary alluvial aquifer. The Rocky Flats Site is located on the northwest margin of the basin. The shallow groundwater system at the Rocky Flats Site is divided into upper and lower hydrostratigraphic units (UHSU and LHSU, respectively). The UHSU at the Rocky Flats site comprises Quaternary alluvium, colluvium, valley-fill alluvium, artificial fill, weathered bedrock of the undifferentiated Arapahoe and Laramie formations and all sandstones that are hydraulically connected with overlying surficial groundwater. The LHSU comprises unweathered claystone with interbedded siltstones and sandstones of the undifferentiated Arapahoe and Laramie formations. The contact separating the UHSU and LHSU is identified as the base of the weathered zone. The separation of hydrostratigraphic units is supported by the contrasting permeabilities of the units comprising the UHSU and LHSU, well hydrograph data indicating that the units respond differently to seasonal recharge events, and geochemical data reflecting distinct major ion chemistries in the groundwaters of the UHSU and LHSU. Surface-water/groundwater interactions at the Rocky Flats site generally respond to seasonal fluctuations in precipitation, recharge, groundwater storage, and stream and ditch flow. Effluent conditions are dominant in the spring along western stream segments and influent conditions are common in the late summer and fall along most stream reaches.

  16. Benchmarking and Performance Improvement at Rocky Flats Environmental Technology Site

    SciTech Connect (OSTI)

    Elliott, C. , Doyle, D. , Featherman, W.D.

    1997-12-31

    The Rocky Flats Environmental Technology Site (RFETS) has initiated a major work process improvement campaign using the tools of formalized benchmarking and streamlining. This paper provides insights into some of the process improvement activities performed at Rocky Flats from November 1995 through December 1996. It reviews the background, motivation, methodology, results, and lessons learned from this ongoing effort. The paper also presents important gains realized through process analysis and improvement including significant cost savings, productivity improvements, and an enhanced understanding of site work processes.

  17. TGS measurements of pyrochemical salts at Rocky Flats

    SciTech Connect (OSTI)

    Mercer, D. J.; Hansen, J. S.; Lestone, J. P.; Prettyman, T. H.

    2001-01-01

    A new skid-mounted tomographic gamma scanner (TGS) was designed to assist in the decommissioning of Rocky Flats Building 37 1, This instrument was used to assay pyrochemical salts as a prerequisite for disposal at the Waste Isolation Pilot Plant (WIPP). The following paper discusses measurement challenges and results from the first year of operation of the instrument.

  18. Site wide integration of the Rocky Flats closure project

    SciTech Connect (OSTI)

    Burdge, L.F.; Golan, P.

    1998-06-01

    The prime contractor for the Rocky Flats Closure Project (RFCP), Kaiser-Hill, in concert with the Department of Energy--Rocky Flats Field Office (DOE-RFFO) has applied a fully integrated, life-cycle, critical path schedule and work planning system to manage the work that is required to close the Site. The closure of the Site is complex, in that it houses over 700 facilities, 19,600 kilograms of Special Nuclear Material (Plutonium and Uranium), and over 160,000 cubic meters of Transuranic, Low Level, and Hazardous Waste. The deactivation, decommissioning, decontaminating, and demolition of this large number of facilities, while at the same time accommodating difficult on-going activities, significantly increases the sophistication required in the planning process. The Rocky Flats team has overcome these difficulties by establishing a money oriented critical path process, to provide a least-cost avenue to supporting on-going activities and a line-of-balance process for production oriented activities. These processes, when integrated with a typical activity-based project planning system, guide the way to the shortest and most cost-effective course for the closure of the Rocky Flats Site.

  19. Adsorption study for uranium in Rocky Flats groundwater

    SciTech Connect (OSTI)

    Laul, J.C.; Rupert, M.C.; Harris, M.J.; Duran, A.

    1995-01-01

    Six adsorbents were studied to determine their effectiveness in removing uranium in Rocky Flats groundwater. The bench column and batch (Kd) tests showed that uranium can be removed (>99.9%) by four adsorbents. Bone Charcoal (R1O22); F-1 Alumina (granular activated alumina); BIOFIX (immobilized biological agent); SOPBPLUS (mixed metal oxide); Filtrasorb 300 (granular activated carbon); and Zeolite (clinoptilolite).

  20. The US Department of Energy`s facility reuse at the Rocky Flats Environmental Technology Site

    SciTech Connect (OSTI)

    1998-08-01

    This audit was initiated to determine whether the Rocky Flats Environmental Technology Site was maximizing its reuse of excess facilities.

  1. Photo of the Week: Rocky Flats Wildlife Refuge | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rocky Flats Wildlife Refuge Photo of the Week: Rocky Flats Wildlife Refuge December 21, 2012 - 11:27am Addthis The Rocky Flats Plant was first established in 1951 as a nuclear weapons manufacturing facility. Today, almost 4,000 acres make up the Rocky Flats National Wildlife Refuge. Located just 16 miles northwest of Denver, Colorado, the refuge provides a habitat for migratory birds and mammals. | Photo courtesy of the U.S. Department of Energy. The Rocky Flats Plant was first established in

  2. Facility overview for commercial application of selected Rocky Flats facilities

    SciTech Connect (OSTI)

    1996-11-01

    The purpose of this Facility Overview is to support the Rocky Flats Local Impacts Initiative`s Request for Interest, to solicit interest from commercial corporations for utilizing buildings 865 and 883, and the equipment contained within each building, for a commercial venture. In the following sections, this document describes the Rocky Flats Site, the buildings available for lease, the equipment within these buildings, the site services available to a tenant, the human resources available to support operations in buildings 865 and 883, and the environmental condition of the buildings and property. In addition, a brief description is provided of the work performed to date to explore the potential products that might be manufactured in Buildings 865 and 883, and the markets for these products.

  3. Polymer solidification of mixed wastes at the Rocky Flats Plant

    SciTech Connect (OSTI)

    Faucette, A.M.; Logsdon, B.W.; Lucerna, J.J.; Yudnich, R.J.

    1994-02-01

    The Rocky Flats Plant is pursuing polymer solidification as a viable treatment option for several mixed waste streams that are subject to land disposal restrictions within the Resource Conservation and Recovery Act provisions. Tests completed to date using both surrogate and actual wastes indicate that polyethylene microencapsulation is a viable treatment option for several mixed wastes at the Rocky Flats Plant, including nitrate salts, sludges, and secondary wastes such as ash. Treatability studies conducted on actual salt waste demonstrated that the process is capable of producing waste forms that comply with all applicable regulatory criteria, including the Toxicity Characteristic Leaching Procedure. Tests have also been conducted to evaluate the feasibility of macroencapsulating certain debris wastes in polymers. Several methods and plastics have been tested for macroencapsulation, including post-consumer recycle and regrind polyethylene.

  4. Actinide solution processing at the Rocky Flats Environmental Technology Site

    SciTech Connect (OSTI)

    1995-04-01

    The Department of Energy (DOE) has prepared an Environmental Assessment (EA), DOE/EA-1039, for radioactive solution removal and processing at Rocky Flats Environmental Technology Site, Golden, Colorado. The proposal for solution removal and processing is in response to independent safety assessments and an agreement with the State of Colorado to remove mixed residues at Rocky Flats and reduce the risk of future accidents. Monthly public meetings were held during the scoping and preparation of the EA. The scope of the EA included evaluations of alternative methods and locations of solution processing. A comment period from February 20, 1995 through March 21, 1995 was provided to the public and the State of Colorado to offer written comment on the EA. Comments were received from the State of Colorado and the U.S. Environmental Protection Agency. A response to the agency comments is included in the Final EA.

  5. DECOMMISSIONING CHALLENGES AT THE ROCKY FLATS ENVIRONMENTAL TECHNOLOGY SITE

    SciTech Connect (OSTI)

    Dorr, K. A.; Hoover, J.

    2002-02-25

    This paper presents a discussion of the demolition of the Building 788 cluster at the Rocky Flats Environmental Technology Site (RFETS) in Golden, Colorado. The Building 788 Cluster was a Resource Conservation and Recovery Act (RCRA) permitted storage facilities and ancillary structures. Topics covered include the methods employed for Project Planning, Regulatory Compliance, Waste Management, Hazard Identification, Radiological Controls, Risk Management, Field Implementation, and Cost Schedule control, and Lessons Learned and Project Closeout.

  6. Rocky Flats Plant Site Environmental Report: 1993 Highlights

    SciTech Connect (OSTI)

    Not Available

    1993-12-31

    The Rocky Flats Plant Site Environmental Report provides summary information on the plant`s environmental monitoring programs and the results recorded during 1993. The report contains a compliance summary, results of environmental monitoring and other related programs, a review of environmental remediation activities, information on external gamma radiation dose monitoring, and radiation dose estimates for the surrounding population. This section provides an overview of these topics and summarizes more comprehensive discussions found in the main text of this annual report.

  7. DOE - Office of Legacy Management -- Rocky Flats Petition

    Office of Legacy Management (LM)

    Petition Rocky Flats Site, Colorado Site-Specific Uranium Standards Petition All documents are Adobe Acrobat files. pdf_icon U.S. Department of Energy's Proponent's Pre-Hearing Statement for Proposed Revisions to Segments 4a, 4b, and 5 of Big Dry Creek (Walnut and Woman Creeks) Regulation #38 (5 CCR 1002-38) Figure 1 Figure 2 Thermal Ionization Mass Spectrometry Uranium Results for November 2008 RFETS Waters Thermal Ionization Mass Spectrometry Uranium Results for September 2008 RFETS Waters

  8. Rocky Flats Neutron Detector Testing at Valduc, France

    SciTech Connect (OSTI)

    Kim, S S; Dulik, G M

    2011-01-03

    Recent program requirements of the US Department of Energy/NNSA have led to a need for a criticality accident alarm system to be installed at a newly activated facility. The Criticality Safety Group of the Lawrence Livermore National Laboratory (LLNL) was able to recover and store for possible future use approximately 200 neutron criticality detectors and 20 master alarm panels from the former Rocky Flats Plant in Golden, Colorado when the plant was closed. The Criticality Safety Group participated in a facility analysis and evaluation, the engineering design and review process, as well as the refurbishment, testing, and recalibration of the Rocky Flats criticality alarm system equipment to be used in the new facility. In order to demonstrate the functionality and survivability of the neutron detectors to the effects of an actual criticality accident, neutron detector testing was performed at the French CEA Valduc SILENE reactor from October 7 to October 19, 2010. The neutron detectors were exposed to three criticality events or pulses generated by the SILENE reactor. The first excursion was performed with a bare or unshielded reactor, and the second excursion was made with a lead shielded/reflected reactor, and the third excursion with a polyethylene reflected core. These tests of the Rocky Flats neutron detectors were performed as a part of the 2010 Criticality Accident Alarm System Benchmark Measurements at the SILENE Reactor. The principal investigators for this series of experiments were Thomas M. Miller and John C. Wagner of the Oak Ridge National Laboratory, with Nicolas Authier and Nathalie Baclet of CEA Valduc. Several other organizations were also represented, including the Y-12 National Security Complex, Lawrence Livermore National Laboratory, Los Alamos National Laboratory, CEA Saclay, and Babcock International Group.

  9. Final Land Configuration for the Rocky Flats Environmental Technology Site

    SciTech Connect (OSTI)

    Stegen, R. L.; Kapinos, J. M.; Wehner, J. P.; Snyder, B.; Davis, R. W.

    2006-07-01

    Closure of the Rocky Flats Environmental Technology Site (RFETS) has been completed. The future land use of the site is designated as a National Wildlife Refuge. A joint effort between Kaiser-Hill, Department of Energy, U.S. Fish and Wildlife Service, Environmental Protection Agency, State of Colorado, and other stakeholders was initiated to provide direction for developing the final land configuration. Through early identification of issues and developing mutually agreeable solutions, the final land configuration of the site was successfully completed. (authors)

  10. Health Surveillance Outcomes in Former Rocky Flats Radiation Workers

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Surveillance of Rocky Flats Radiation Workers Janice P. Watkins 1 , Elizabeth D. Ellis 1 , F. Joseph Furman 2 , Roger B. Falk 2 , Joe M. Aldrich 2 , and Donna L. Cragle 1 ORAU Technical Report # 2006-0408 1 Oak Ridge Institute for Science and Education, Center for Epidemiologic Research; P.O. Box 117; Oak Ridge, TN 37831-0117 2 Oak Ridge Institute for Science and Education, Center for Epidemiologic Research; 9950 W. 80 th Avenue, Suite 17; Arvada, CO 80005-3914 This report was funded by

  11. The Rocky Flats Environmental Technology Site beryllium characterization project

    SciTech Connect (OSTI)

    Morrell, D.M.; Miller, J.R.; Allen, D.F.

    1999-06-01

    A site beryllium characterization project was completed at the Rocky Flats Environmental Technology Site (RFETS) in 1997. Information from historical reviews, previous sampling surveys, and a new sampling survey were used to establish a more comprehensive understanding of the locations and levels of beryllium contamination in 35 buildings. A feature of the sampling strategy was to test if process knowledge was a good predictor of where beryllium contamination could be found. Results revealed that this technique was effective at identifying where surface contamination levels might exceed the RFETS smear control level but that it was not effective in identifying where low concentrations of beryllium might be found.

  12. Microsoft Word - FINAL Rocky Flats LBNL report Batch #1.docx

    Office of Legacy Management (LM)

    the First Batch of Rocky Flats Water Samples Submitted to LBNL John N. Christensen Report date 9/16/13 Thirteen samples were submitted by SM Stoller to Lawrence Berkeley National Laboratory for uranium isotopic and concentration analysis- 12 surface water samples from two sites (WALPOC and GS10) covering the period Sept. 2011 to April 2013, and one groundwater sample taken on 5/14/12 from well 79102 (Table 1). Uranium isotopic compositions of the samples were determined at LBNL by MC- ICPMS

  13. Overview of the Third Quarter 2014 Surveillance and Maintenance Report for the LM Rocky Flats Site

    Office of Legacy Management (LM)

    4 Surveillance and Maintenance Report for the LM Rocky Flats Site July-September 2014 Quarterly Monitoring and Reporting  Quarterly reports are required under the Rocky Flats Legacy Management Agreement (RFLMA) to document that the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) remedy continues to be protective * Primary goal is protection of surface water  Response action under the final remedy for Rocky Flats * Maintain two landfill covers * Maintain four

  14. The effect of a small creek valley on drainage flows in the Rocky Flats region

    SciTech Connect (OSTI)

    Porch, W.

    1996-12-31

    Regional scale circulation and mountain-plain interactions and effects on boundary layer development are important for understanding the fate of an atmospheric release from Rocky Flats, Colorado. Numerical modeling of Front Range topographic effects near Rocky Flats have shown that though the Front Range dominates large scale flow features, small-scale terrain features near Rocky Flats are important to local transport during nighttime drainage flow conditions. Rocky Flats has been the focus of interest for the Department of Energy`s Atmospheric Studies in Complex Terrain (ASCOT) program.

  15. Hydraulic model analysis of water distribution system, Rockwell International, Rocky Flats, Colorado

    SciTech Connect (OSTI)

    Perstein, J.; Castellano, J.A.

    1989-01-20

    Rockwell International requested an analysis of the existing plant site water supply distribution system at Rocky Flats, Colorado, to determine its adequacy. On September 26--29, 1988, Hughes Associates, Inc., Fire Protection Engineers, accompanied by Rocky Flats Fire Department engineers and suppression personnel, conducted water flow tests at the Rocky Flats plant site. Thirty-seven flows from various points throughout the plant site were taken on the existing domestic supply/fire main installation to assure comprehensive and thorough representation of the Rocky Flats water distribution system capability. The analysis was completed in four phases which are described, together with a summary of general conclusions and recommendations.

  16. Cementation of residue ion exchange resins at Rocky Flats

    SciTech Connect (OSTI)

    Dustin, D.F.; Beckman, T.D.; Madore, C.M.

    1998-03-03

    Ion exchange resins have been used to purify nitric acid solutions of plutonium at Rocky Flats since the 1950s. Spent ion exchange resins were retained for eventual recovery of residual plutonium, typically by incineration followed by the aqueous extraction of plutonium from the resultant ash. The elimination of incineration as a recovery process in the late 1980s and the absence of a suitable alternative process for plutonium recovery from resins led to a situation where spent ion exchange resins were simply placed into temporary storage. This report describes the method that Rocky Flats is currently using to stabilize residue ion exchange resins. The objective of the resin stabilization program is: (1) to ensure their safety during interim storage at the site, and (2) to prepare them for ultimate shipment to the Waste Isolation Pilot Plant (WIPP) in New Mexico. Included in the discussion is a description of the safety concerns associated with ion exchange resins, alternatives considered for their stabilization, the selection of the preferred treatment method, the means of implementing the preferred option, and the progress to date.

  17. Geologic and geotechnical assessment RFETS Building 371, Rocky Flats, Colorado

    SciTech Connect (OSTI)

    Maryak, M.E.; Wyatt, D.E.; Bartlett, S.F.; Lewis, M.R.; Lee, R.C.

    1995-12-13

    This report describes the review and evaluation of the geological, geotechnical and geophysical data supporting the design basis analysis for the Rocky Flats Environmental Test Site (RFETS) Building 371. The primary purpose of the geologic and geotechnical reviews and assessments described herein are to assess the adequacy of the crustal and near surface rock and soil model used in the seismic analysis of Building 371. This review was requested by the RFETS Seismic Evaluation Program. The purpose was to determine the adequacy of data to support the design basis for Building 371, with respect to seismic loading. The objectives required to meet this goal were to: (1) review techniques used to gather data (2) review analysis and interpretations of the data; and (3) make recommendations to gather additional data if required. Where there were questions or inadequacies in data or interpretation, recommendations were made for new data that will support the design basis analysis and operation of Building 371. In addition, recommendations are provided for a geologic and geophysical assessment for a new facility at the Rocky Flats Site.

  18. Rocky Flats Closure: the Role of Models in Facilitating Scientific Communication With Stakeholder Groups

    SciTech Connect (OSTI)

    Clark, D.L.; Choppin, G.R.; Dayton, C.S.; Janecky, D.R.; Lane, L.J.; Paton, I.

    2009-05-28

    The Rocky Flats Environmental Technology Site (RFETS) was a U.S. Department of Energy (DOE) environmental cleanup site for a previous manufacturing plant that made components for the U.S. nuclear weapons arsenal. The facility was shut down in 1989 to address environmental and safety concerns, and left behind a legacy of contaminated facilities, soils, surface and ground water. In 1995, the Site contractor established the Actinide Migration Evaluation (AME) advisory group to provide advice and technical expertise on issues of actinide behavior and mobility in the air, surface water, groundwater, and soil. Through a combination of expert judgment supported by state-of-the-art scientific measurements, it was shown that under environmental conditions at Rocky Flats, plutonium and americium form insoluble oxides that adhere to small soil, organic, and mineral particles and colloids, or are colloidal materials themselves. A series of models ranging from conceptual, geostatistical, and large-scale wind and surface water erosion models were used to guide stakeholder interactions. The nature of these models, and their use in public communication is described.

  19. Rocky Flats Plant: Test bed for transitioning from weapons production mission to environmental restoration, waste management, and economic development missions

    SciTech Connect (OSTI)

    Benjamin, A.; Murthy, K.S.; Krenzer, R.W.; Williams, R.E.; Detamore, J.A.; Brown, C.M.; Francis, G.E.; Lucerna, J.J.

    1993-01-07

    Redirection of Rocky Flats Plant`s (RF) mission is an inevitable result of changes in the worldwide social, political, and environmental factors. These changes were exemplified in the cancellation of the W-88 Warhead in January 1992, by the President of the United States. These unprecedented changes have altered the RF`s traditional nuclear weapons production mission to the transition mission, i.e., cleanup, preparation for deactivation and decontamination, decommissioning, dismantlement and demolition, and when appropriate, economic development, of the facilities. The purpose of this paper is to describe the essentials of the technical approach and management actions advanced by EG&G Rocky Flats, Inc., to organize, staff, direct, and control the activities necessary to transition the RF from its historical weapons production mission to the transition mission.

  20. Rocky Flats Plant: Test bed for transitioning from weapons production mission to environmental restoration, waste management, and economic development missions

    SciTech Connect (OSTI)

    Benjamin, A.; Murthy, K.S.; Krenzer, R.W.; Williams, R.E.; Detamore, J.A.; Brown, C.M.; Francis, G.E.; Lucerna, J.J.

    1993-01-07

    Redirection of Rocky Flats Plant's (RF) mission is an inevitable result of changes in the worldwide social, political, and environmental factors. These changes were exemplified in the cancellation of the W-88 Warhead in January 1992, by the President of the United States. These unprecedented changes have altered the RF's traditional nuclear weapons production mission to the transition mission, i.e., cleanup, preparation for deactivation and decontamination, decommissioning, dismantlement and demolition, and when appropriate, economic development, of the facilities. The purpose of this paper is to describe the essentials of the technical approach and management actions advanced by EG G Rocky Flats, Inc., to organize, staff, direct, and control the activities necessary to transition the RF from its historical weapons production mission to the transition mission.

  1. Integrated Weed Control for Land Stewardship at Legacy Management's Rocky Flats Site in Colorado - 13086

    SciTech Connect (OSTI)

    Nelson, Jody K.

    2013-07-01

    Land stewardship is one of nine sustainability programs in the U.S. Department of Energy's Environmental Management System. Land stewardship includes maintaining and improving ecosystem health. At the Rocky Flats Site near Westminster, Colorado, land stewardship is an integral component of the Office of Legacy Management's post-closure monitoring and management at the site. Nearly 263 hectares (650 acres) were disturbed and re-vegetated during site cleanup and closure operations. Proactive management of revegetation areas is critical to the successful reestablishment of native grasslands, wetlands, and riparian communities. The undisturbed native plant communities that occur at the site also require active management to maintain the high-quality wetlands and other habitats that are home to numerous species of birds and other wildlife such as elk and deer, rare plant communities, and the federally listed threatened Preble's meadow jumping mouse. Over the past several decades, an increase of Noxious weeds has impacted much of Colorado's Front Range. As a result, weed control is a key component of the land stewardship program at Rocky Flats. Thirty-three species of state-listed Noxious weeds are known to occur in the Central and Peripheral Operable Units at Rocky Flats, along with another five species that are considered invasive at the site. Early detection and rapid response to control new invasive species is crucial to the program. An integrated weed control/vegetation management approach is key to maintaining healthy, sustainable plant communities that are able to resist Noxious weed invasions. Weed mapping, field surveys, and field-staff training sessions (to learn how to identify new potential problem species) are conducted to help detect and prevent new weed problems. The integrated approach at Rocky Flats includes administrative and cultural techniques (prevention), mechanical controls, biological controls, and chemical controls. Several species of biocontrol insects have been released to assist with control of different target weed species. Monitoring is conducted to evaluate the effectiveness of control efforts and to provide information for future control efforts. The effective implementation of this integrated approach has reduced the infestation levels of many species and has kept several newly discovered invasive species from spreading and becoming larger problems at the site. (authors)

  2. Preliminary surficial geologic map of the Rocky Flats Plant and vicinity, Jefferson and Boulder Counties, Colorado

    SciTech Connect (OSTI)

    Shroba, R.R.; Carrara, P.E.

    1994-11-01

    This report contains a 1:6000 scale map of the 3-mile by 4-mile rectangular area surrounding the Rocky Flats Plant. The map shows the surface deposits estimated to be at least one meter thick. The accompanying report contains a detailed description of the map units, a discussion of the Rocky Flats alluvium and landslides, and cited references. 37 references.

  3. Analysis of offsite Emergency Planning Zones for Rocky Flats Plant

    SciTech Connect (OSTI)

    Inger, J.R. ); Brown-Strattan, M.A. . Rocky Flats Plant)

    1991-01-01

    The purpose of this quality assurance program was to ensure the quality and technical adequacy of Phase 2 of the Analysis of Offsite Emergency Planning Zones (EPZ) for the Rocky Flats Plant project. Quality assurance was accomplished by managing and controlling the processes in the development of the product. The quality assurance task team conducted audits, reviews, and surveillances of project and related activities. This process contributed to identifying areas where the quality assurance plan was not fully implemented, areas needing improvement, and/or corrective actions resulting in a improved product. During the reviews and audits, several key areas were identified where quality assurance plan implementation needed to be improved. These areas included maintaining adequate documentation, reviewing technical results, making inputs traceable to technical results, and understanding that all personnel are responsible for quality.

  4. Rocky Flats Plant Live-Fire Range Risk Analysis Report

    SciTech Connect (OSTI)

    Nicolosi, S.L.; Rodriguez, M.A.

    1994-04-01

    The objective of the Live-Fire Range Risk Analysis Report (RAR) is to provide an authorization basis for operation as required by DOE 5480.16. The existing Live-Fire Range does not have a safety analysis-related authorization basis. EG&G Rocky Flats, Inc. has worked with DOE and its representatives to develop a format and content description for development of an RAR for the Live-Fire Range. Development of the RAR is closely aligned with development of the design for a baffle system to control risks from errant projectiles. DOE 5480.16 requires either an RAR or a safety analysis report (SAR) for live-fire ranges. An RAR rather than a SAR was selected in order to gain flexibility to more closely address the safety analysis and conduct of operation needs for a live-fire range in a cost-effective manner.

  5. Cementation and solidification of Rocky Flats Plant incinerator ash

    SciTech Connect (OSTI)

    Phillips, J.A.; Semones, G.B.

    1994-04-01

    Cementation studies on various aqueous waste streams at Rocky Flats have shown this technology to be effective for immobilizing the RCRA constituents in the waste. Cementation is also being evaluated for encapsulation of incinerator ash. Experiments will initially evaluate a surrogate ash waste using a Taguchi experimental design to optimize the cement formulation and waste loading levels for this application. Variables of waste loading, fly ash additions, water/cement ratio, and cement type will be tested at three levels each during the course of this work. Tests will finally be conducted on actual waste using the optimized cement formulation developed from this testing. This progression of tests will evaluate the effectiveness of cement encapsulation for this waste stream without generating any additional wastes.

  6. Properties of vitrified Rocky Flats TRUW with different waste loadings

    SciTech Connect (OSTI)

    Eddy, T.L.; Sears, J.W.; Grandy, J.D.; Miley, D.V.; Erickson, A.W.; Fransworth, R.N.; Larsen, E.D.

    1994-07-01

    One of the major waste streams at the Idaho National Laboratory (INEL) is a combination of the Rocky Flats Plant 1st and 2nd stage sludges (hydrated metal oxides or H-series), which constitutes about 20 wt % of the buried waste. A similar mass fraction is in interim storage. The buried waste is commingled with about five times as much soil that has become contaminated as the containers have deteriorated. The purpose of this paper is to report on waste form property variations of the H-series waste melted with various fractions of soil, plus volatile and hazardous metals and transuranic surrogates. Optimally, the waste form will minimize the bulk leach rate, maximize the volume reduction, minimize the additives needed, and stabilize the transuranic nuclides. Topics to be discussed include the input and final compositions, the melting and crystallization processes, the test results, and conclusions.

  7. Rocky Flats 10 year plan: over 500 structures to be demolished

    SciTech Connect (OSTI)

    Evans, B.; Bengel, P.

    1997-03-01

    Rocky Flats Environmental Technology Site has prepared a Ten Year Plan (Plan) that demonstrates how the Site would achieve accelerated cleanup and rapidly reduce the risks the Site currently poses to its workers, the public, and the environment. A major element of the Plan is the decontamination and demolition of over 500 Site facilities, including all of the former nuclear production facilities, by the end of 2006. Facilities used for the storage of plutonium, treatment of low-level mixed waste, and several office building would remain until the plutonium is removed or there is no longer a need for the facility, in which case it would be demolished. While the Plan considers all aspects of the cleanup and closure, this paper focuses on the challenges posed by the removal of highly contaminated equipment and the demolition of structures. This paper describes near- term decommissioning projects as well as the long range plans and budgets. Cash flow ultimately controls schedule, and sharing of budget priorities among processing of special nuclear material, disposing of waste, and cleaning up the environment has to be juggled carefully to attain the goals of the Plan. The total cost of the Plan exceeds $5 billion, and over $1 billion will be spent on decommissioning activities. Following removal of the plutonium and the demolition of the plutonium storage and remaining Site facilities by the end of 2015, the cost to perform the long-term environmental monitoring at the Site is estimated to be $10 million per year.

  8. Post-Closure Land Jurisdiction Transfer to the US Fish and Wildlife Service at Rocky Flats: Surviving the Safari Through Old Records and Other Lessons Learned

    SciTech Connect (OSTI)

    Schiesswohl, S.; Hanson, M.

    2008-07-01

    The U.S. Department of Energy's (DOE's) Rocky Flats Site (Rocky Flats), located near Denver, Colorado, was listed on the Comprehensive Environmental Response, Compensation, and Liability Act National Priorities List (NPL) in 1989. Subsequent cleanup and closure activities were completed in October 2005 and the final remedy was selected in September 2006. The remedy is 'no further action' for the generally un-impacted Peripheral Operable Unit (OU), formerly known as the Buffer Zone, and institutional and physical controls with continued monitoring for the Central OU, formerly the industrialized area. The Peripheral OU has been deleted from the NPL and jurisdiction over the majority of land in that OU (3,953 acres) was transferred to the U.S. Fish and Wildlife Service (USFWS) on July 12, 2007, to establish the Rocky Flats National Wildlife Refuge. The remaining approximately 929 acres in the Peripheral OU were retained by DOE's Office of Legacy Management where outstanding mineral leases and mining operations exist. As mineral rights are purchased or mining operations and mineral leases are completed and fully reclaimed, jurisdiction of portions of the 929 acres will also be transferred to USFWS for inclusion into the refuge. During the almost 2 years since cleanup and closure work was completed at Rocky Flats, DOE and USFWS have worked the specific legal parameters, timing, and constraints of the 3,953-acre transfer. Many lessons have been learned, based on these early experiences. (authors)

  9. Community Surveys: Low Dose Radiation. Fernald, Ohio and Rocky Flats, Colorado

    SciTech Connect (OSTI)

    C. K. Mertz; James Flynn; Donald G. MacGregor; Theresa Satterfield; Stephen M. Johnson; Seth Tuler; Thomas Webler

    2002-10-16

    This report is intended to present a basic description of the data from the two community surveys and to document the text of the questions; the methods used for the survey data collection; and a brief overview of the results. Completed surveys were conducted at local communities near the Rocky Flats, Colorado and the Fernald, Ohio sites; no survey was conducted for the Brookhaven, New York site. Fernald. The Fernald sample was randomly selected from 98% of all potential residential telephones in the townships of Ross, Morgan, and Crosby. The only telephone exchanges not used for the Fernald study had 4%, or fewer, of the holders of the telephone numbers actually living in either of the three target townships. Surveying started on July 24, 2001 and finished on August 30, 2001. A total of 399 completed interviews were obtained resulting in a CASRO response rate of 41.8%. The average length of an interview was 16.5 minutes. Rocky Flats. The sample was randomly selected from all potential residential telephones in Arvada and from 99% of the potential telephones in Westminster. Surveying started on August 10, 2001 and finished on September 25, 2001. A total of 401 completed interviews were obtained with a CASRO response rate of 32.5%. The average length of an interview was 15.7 minutes. Overall, respondents hold favorable views of science. They indicate an interest in developments in science and technology, feel that the world is better off because of science, and that science makes our lives healthier, easier, and more comfortable. However, respondents are divided on whether science should decide what is safe or not safe for themselves and their families. The majority of the respondents think that standards for exposure to radiation should be based on what science knows about health effects of radiation and on what is possible with today's technology. Although few respondents had visited the sites, most had heard or read something about Fernald or Rocky Flat s in the media. Impressions of the sites tend to be negative. Most respondents feel that overall their community would be better off without the site. However, when asked about the economic future of their community after cleanup and closure of the site, only 31-43% thought that it will be better, 47-56% thought their local economy will be about the same.

  10. Supercompaction and Repackaging Facility for Rocky Flats Plant transuranic waste

    SciTech Connect (OSTI)

    Barthel, J.M.

    1988-01-01

    The Supercompaction and Repackaging Facility (SaRF) for processing Rocky Flats Plant (RFP) generated transuranic (TRU) waste was conceptualized and has received funding of $1.9 million. The SaRF is scheduled for completion in September, 1989 and will eliminate a labor intensive manual repackaging effort. The semi-automated glovebox-contained SaRF is being designed to process 63,500 cubic feet of TRU waste annually for disposal at the Waste Isolation Pilot Plant (WIPP). Waste will enter the process through an airlock or drum dump and the combustible waste will be precompacted. Drums will be pierced to allow air to escape during supercompaction. Each drum will be supercompacted and transferred to a load out station for final packaging into a 55 gallon drum. Preliminary evaluations indicate an average 5 to 1 volume reduction, 2 to 1 increased processing rate, and 50% reduction in manpower. The SaRF will produce a significant annual savings in labor, material, shipping, and burial costs over the projected 15 year life, and also improve operator safety, reduce personnel exposure, and improve the quality of the waste product. 1 ref., 10 figs., 3 tabs.

  11. Risk-Quantified Decision-Making at Rocky Flats

    SciTech Connect (OSTI)

    Myers, Jeffrey C.

    2008-01-15

    Surface soils in the 903 Pad Lip Area of the Rocky Flats Environmental Technology Site (RFETS) were contaminated with {sup 239/240}Pu by site operations. To meet remediation goals, accurate definition of areas where {sup 239/240}Pu activity exceeded the threshold level of 50 pCi/g and those below 50- pCi/g needed definition. In addition, the confidence for remedial decisions needed to be quantified and displayed visually. Remedial objectives needed to achieve a 90 percent certainty that unremediated soils had less than a 10 percent chance of {sup 239/240}Pu activity exceeding 50-pCi/g. Removing areas where the chance of exceedance is greater than 10 percent creates a 90 percent confidence in the remedial effort results. To achieve the stipulated goals, the geostatistical approach of probability kriging (Myers 1997) was implemented. Lessons learnt: Geostatistical techniques provided a risk-quantified approach to remedial decision-making and provided visualizations of the excavation area. Error analysis demonstrated compliance and confirmed that more than sufficient soils were removed. Error analysis also illustrated that any soils above the threshold that were not removed would be of nominal activity. These quantitative approaches were useful from a regulatory, engineering, and stakeholder satisfaction perspective.

  12. Environmental Survey preliminary report, Rocky Flats Plant, Golden, Colorado

    SciTech Connect (OSTI)

    Not Available

    1987-06-01

    This report presents the preliminary findings of the Environmental Survey of the United States Department of Energy (DOE), Rocky Flats Plant (RFP), conducted August 11 through 22, 1986. The Survey is being conducted by an multidisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team members are outside experts supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the RFP. The Survey covers all environmental media and all areas of environmental regulations. It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involves the review of existing site environmental data observations of the operations carried on at RFP, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain environmental problems identified during its on-site activates. The Sampling and Analysis Plan is being executed by DOE's Oak Ridge National Laboratory. When completed, the results will be incorporated into the RFP Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the RFP Survey. 75 refs., 24 figs., 33 tabs.

  13. Washing of Rocky Flats Combustible Residues (Conducted March - May 1995)

    SciTech Connect (OSTI)

    Mary E. Barr; Ann R. Schake; David A. Romero; Gordon D. Jarvinen

    1999-03-01

    The scope of this project is to determine the feasibility of washing plutonium-containing combustible residues using ultrasonic disruption as a method for dislodging particulate. Removal of plutonium particulate and, to a lesser extent, solubilized plutonium from the organic substrate should substantially reduce potential fire, explosion or radioactive release hazards due to radiolytic hydrogen generation or high flammability. Tests were conducted on polypropylene filters which were used as pre-filters in the rich-residue ion-exchange process at the Los Alamos Plutonium Facility. These filters are similar to the Ful-Flo{reg_sign} cartridges used at Rocky Flats that make up a substantial fraction of the combustible residues with the highest hazard rating. Batch experiments were run on crushed filter material in order to determine the amount of Pu removed by stirring, stirring and sonication, and stirring and sonication with the introduction of Pu-chelating water-soluble polymers or surfactants. Significantly more Pu is removed using sonication and sonication with chelators than is removed with mechanical stirring alone.

  14. DISPOSITION PATHS FOR ROCKY FLATS GLOVEBOXES: EVALUATING OPTIONS

    SciTech Connect (OSTI)

    Lobdell, D.; Geimer, R.; Larsen, P.; Loveland, K.

    2003-02-27

    The Kaiser-Hill Company, LLC has the responsibility for closure activities at the Rocky Flats Environmental Technology Site (RFETS). One of the challenges faced for closure is the disposition of radiologically contaminated gloveboxes. Evaluation of the disposition options for gloveboxes included a detailed analysis of available treatment capabilities, disposal facilities, and lifecycle costs. The Kaiser-Hill Company, LLC followed several processes in determining how the gloveboxes would be managed for disposition. Currently, multiple disposition paths have been chosen to accommodate the needs of the varying styles and conditions of the gloveboxes, meet the needs of the decommissioning team, and to best manage lifecycle costs. Several challenges associated with developing a disposition path that addresses both the radiological and RCRA concerns as well as offering the most cost-effective solution were encountered. These challenges included meeting the radiological waste acceptance criteria of available disposal facilities, making a RCRA determination, evaluating treatment options and costs, addressing void requirements associated with disposal, and identifying packaging and transportation options. The varying disposal facility requirements affected disposition choices. Facility conditions that impacted decisions included radiological and chemical waste acceptance criteria, physical requirements, and measurement for payment options. The facility requirements also impacted onsite activities including management strategies, decontamination activities, and life-cycle cost.

  15. Technical Safety Appraisal of the Rocky Flats Plant

    SciTech Connect (OSTI)

    Brown, Blake P.

    1989-01-01

    This report provides the results of a Technical Safety Appraisal (TSA) of the Rocky Flats Plant (RFP) conducted November 14 to 18 and November 28 to December 9, 1988. This appraisal covered the effectiveness and improvements in the RFP safety program across the site, evaluating progress to date against standards of accepted practice. The appraisal included coverage of the timeliness and effectiveness of actions taken in response to the recommendations/concerns in three previous Technical Safety Appraisals (TSAs) of RFP Bldg. 707 conducted in July 1986, Bldgs. 771/774 conducted in October/November 1986, and Bldgs. 776/777 conducted in January/February 1988. Results of this appraisal are given in Section IV for each of 14 technical safety areas at RFP. These results include a discussion, conclusions and any new safety concerns for each technical safety area. Appendix A contains a description of the system for categorizing concerns, and the concerns are tabulated in Appendix B. Appendix C reports on the evaluation of the contractor's actions and the current status of each of the 230 recommendations and concerns contained in the three previous TSA reports.

  16. Preliminary Notice of Violation, Rocky Flats Environmental Technology Site- EA-96-05

    Broader source: Energy.gov [DOE]

    Preliminary Notice of Violation issued to Safe Sites of Colorado related to Radiological and Work Control Deficiencies associated with Two Radiological Release Events at the Rocky Flats Environmental Technology Site, (EA-96-05)

  17. Evolution of a Groundwater Treatment System—Rocky Flats, Colorado, Site

    Broader source: Energy.gov [DOE]

    A project to reconfigure the East Trenches Plume Treatment System (ETPTS) at the Rocky Flats site, to improve treatment effectiveness and meet the strict water quality standards in the area, is...

  18. VWZ-0008- In the Matter of EG&G Rocky Flats, Inc.

    Broader source: Energy.gov [DOE]

    This decision will consider a Motion for Partial Dismissal and Limitation on Scope of Complainant's Claims filed by EG&G Rocky Flats, Inc. (EG&G) on June 13, 1997. In its motion, EG&G...

  19. Comparison and evaluation of turbulence estimation schemes at Rocky Flats Plant

    SciTech Connect (OSTI)

    Bowen, B.M.; Pamp, S.E.

    1993-10-01

    The Rocky Flats Plant (RFP) routinely measures meteorological data to support Air Quality and Emergency Response activities. These data help to characterize the transport and dispersion of actual or potential airborne releases of radionuclides or other hazardous materials.

  20. EA-1146: Radioactive Waste Storage at Rocky Flats Environmental Technology Site, Golden, Colorado

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of the proposal to convert buildings at the U.S. Department of Energy Rocky Flats Environmental Technology Site from their former uses to interim waste...

  1. DOE's Former Rocky Flats Weapons Production Site to Become National Wildlife Refuge

    Broader source: Energy.gov [DOE]

    WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced the transfer of nearly 4,000 acres of its former Rocky Flats nuclear weapons production site to the Department of the Interior's...

  2. Idaho National Engineering Laboratory code assessment of the Rocky Flats transuranic waste

    SciTech Connect (OSTI)

    1995-07-01

    This report is an assessment of the content codes associated with transuranic waste shipped from the Rocky Flats Plant in Golden, Colorado, to INEL. The primary objective of this document is to characterize and describe the transuranic wastes shipped to INEL from Rocky Flats by item description code (IDC). This information will aid INEL in determining if the waste meets the waste acceptance criteria (WAC) of the Waste Isolation Pilot Plant (WIPP). The waste covered by this content code assessment was shipped from Rocky Flats between 1985 and 1989. These years coincide with the dates for information available in the Rocky Flats Solid Waste Information Management System (SWIMS). The majority of waste shipped during this time was certified to the existing WIPP WAC. This waste is referred to as precertified waste. Reassessment of these precertified waste containers is necessary because of changes in the WIPP WAC. To accomplish this assessment, the analytical and process knowledge available on the various IDCs used at Rocky Flats were evaluated. Rocky Flats sources for this information include employee interviews, SWIMS, Transuranic Waste Certification Program, Transuranic Waste Inspection Procedure, Backlog Waste Baseline Books, WIPP Experimental Waste Characterization Program (headspace analysis), and other related documents, procedures, and programs. Summaries are provided of: (a) certification information, (b) waste description, (c) generation source, (d) recovery method, (e) waste packaging and handling information, (f) container preparation information, (g) assay information, (h) inspection information, (i) analytical data, and (j) RCRA characterization.

  3. Analysis of offsite Emergency Planning Zones (EPZ) for the Rocky Flats Plant

    SciTech Connect (OSTI)

    Hodgin, C.R.; Armstrong, C.; Daugherty, N.M.; Foppe, T.L.; Petrocchi, A.J.; Southward, B.

    1990-05-01

    This project plan for Phase II summarizes the design of a project to complete analysis of offsite Emergency Planning Zones (EPZ) for the Rocky Flats Plant. Federal, state, and local governments develop emergency plans for facilities that may affect the public in the event of an accidental release of nuclear or hazardous materials. One of the purposes of these plans is to identify EPZs where actions might be necessary to protect public health. Public protective actions include sheltering, evacuation, and relocation. Agencies use EPZs to develop response plans and to determine needed resources. The State of Colorado, with support from the US Department of Energy (DOE) and Rocky Flats contractors, has developed emergency plans and EPZs for the Rocky Flats Plant periodically beginning in 1980. In Phase II, Interim Emergency Planning Zones Analysis, Maximum Credible Accident'' we will utilize the current Rocky Flats maximum credible accident (MCA), existing dispersion methodologies, and upgraded dosimetry methodologies to update the radiological EPZs. Additionally, we will develop recommendations for EPZs for nonradiological hazardous materials releases and evaluate potential surface water releases from the facility. This project will allow EG G Rocky Flats to meet current commitments to the state of Colorado and make steady, tangible improvements in our understanding of risk to offsite populations during potential emergencies at the Rocky Flats Plant. 8 refs., 5 figs., 4 tabs.

  4. Transportation of pyrochemical salts from Rocky Flats to Los Alamos

    SciTech Connect (OSTI)

    Schreiber, S.B.

    1997-02-01

    Radioactive legacy wastes or residues are currently being stored on numerous Sites around the former Department of Energy`s (DOE) Nuclear Weapons Complex. Since most of the operating facilities were shut down and have not operated since before the declared end to the Cold War in 1993, the historical method for treating these residues no longer exists. The risk associated with continued storage of these residues will dramatically increase with time. Thus, the DOE was directed by the Defense Nuclear Facility Safety Board in its Recommendation 94-1 to address and stabilize these residues and established an eight year time frame for doing so. There are only two options available to respond to this requirement: (1) restart existing facilities to treat and package the residues for disposal or (2) transport the residues to another operating facility within the Complex where they can be treated and packaged for disposal. This paper focuses on one such residue type, pyrochemical salts, produced at one Complex site, the Rocky Flats Plant located northwest of Denver, Colorado. One option for treating the salts is their shipment to Los Alamos, New Mexico, for handling at the Plutonium Facility. The safe transportation of these salts can be accomplished at present with several shipping containers including a DOT 6M, a DOE 9968, Type A or Type B quantity 55-gallon drum overpacks, or even the TRUPACT II. The tradeoffs between each container is examined with the conclusion that none of the available shipping containers is fully satisfactory. Thus, the advantageous aspects of each container must be utilized in an integrated and efficient way to effectively manage the risk involved. 1 fig.

  5. Hanford/Rocky Flats collaboration on development of supercritical carbon dioxide extraction to treat mixed waste

    SciTech Connect (OSTI)

    Hendrickson, D.W.; Biyani, R.K.; Brown, C.M.; Teter, W.L.

    1995-11-01

    Proposals for demonstration work under the Department of Energy`s Mixed Waste Focus Area, during the 1996 through 1997 fiscal years included two applications of supercritical carbon dioxide to mixed waste pretreatment. These proposals included task RF15MW58 of Rocky Flats and task RL46MW59 of Hanford. Analysis of compatibilities in wastes and work scopes yielded an expectation of substantial collaboration between sites whereby Hanford waste streams may undergo demonstration testing at Rocky Flats, thereby eliminating the need for test facilities at Hanford. This form of collaboration is premised the continued deployment at Rocky Flats and the capability for Hanford samples to be treated at Rocky Flats. The recent creation of a thermal treatment contract for a facility near Hanford may alleviate the need to conduct organic extraction upon Rocky Flats wastes by providing a cost effective thermal treatment alternative, however, some waste streams at Hanford will continue to require organic extraction. Final site waste stream treatment locations are not within the scope of this document.

  6. FINAL REPORT FORMER RADIATION WORKER MEDICAL SURVEILLANCE PROGRAM AT ROCKY FLATS For Department of Energy Programs

    SciTech Connect (OSTI)

    Joe M. Aldrich

    2004-11-01

    The Former Radiation Worker Medical Surveillance Program at Rocky Flats was conducted in Arvada, CO, by Oak Ridge Associated Universities through the Oak Ridge Institute for Science and Education under DOE Contract DE-AC05-00OR22750. Objectives of the program were to obtain information on the value of medical surveillance among at-risk former radiation workers and to provide long-term internal radiation dosimetry information to the scientific community. This program provided the former radiation workers of the Rocky Flats Environmental Technology Site (formerly Rocky Flats Plant) an opportunity to receive follow-up medical monitoring and a re-evaluation of their internal radiation dose. The former Rocky Flats radiation worker population is distinctive because it was a reasonably stable work force that received occupational exposures, at times substantial, over several decades. This report reflects the summation of health outcomes, statistical analyses, and dose assessment information on former Rocky Flats radiation workers to the date of study termination as of March 2004.

  7. Clarification of Institutional Controls at the Rocky Flats Site Central Operable Unit and Implementation of the Soil Disturbance Review Plan - 13053

    SciTech Connect (OSTI)

    DiSalvo, Rick; Surovchak, Scott; Spreng, Carl; Moritz, Vera

    2013-07-01

    Cleanup and closure of DOE's Rocky Flats Site in Colorado, which was placed on the CERCLA National Priority List in 1989, was accomplished under CERCLA, RCRA, and the Colorado Hazardous Waste Act (CHWA). The physical cleanup work was completed in late 2005 and all buildings and other structures that composed the Rocky Flats industrial complex were removed from the surface, but remnants remain in the subsurface. Other remaining features include two landfills closed in place with covers, four groundwater treatment systems, and surface water and groundwater monitoring systems. Under the 2006 Corrective Action Decision/Record of Decision for Rocky Flats Plant (US DOE) Peripheral Operable Unit and the Central Operable Unit (CAD/ROD), the response actions selected for the Central Operable Unit (OU) are institutional controls (ICs), physical controls, and continued monitoring and maintenance. The objectives of these ICs were to prevent unacceptable exposure to remaining subsurface contamination and to prevent contaminants from mobilizing to surface water and to prevent interfering with the proper functioning of the engineered components of the remedy. An amendment in 2011 of the 2006 CAD/ROD clarified the ICs to prevent misinterpretation that would prohibit work to manage and maintain the Central OU property. The 2011 amendment incorporated a protocol for a Soil Disturbance Review Plan for work subject to ICs that requires approval from the State and public notification by DOE prior to conducting approved soil-disturbing work. (authors)

  8. Rocky Flats Plant Site Environmental Report for 1992

    SciTech Connect (OSTI)

    Cirrincione, D.A.; Erdmann, N.L.

    1992-12-31

    The Rocky Rats Plant Site Environmental Report provides summary information on the plant`s environmental monitoring programs and the results recorded during 1992. The report contains a compliance summary, results of environmental monitoring and other related programs, a review of environmental remediation activities, information on external gamma radiation dose monitoring, and radiation dose estimates for the surrounding population.

  9. Long-term risk stabilization of the Rocky Flats Plant residues

    SciTech Connect (OSTI)

    Melberg, T.A.

    1994-12-31

    The liquid and solid residues continue to be a concern at Rocky Flats, primarily due to safety aspects of long-term storage and of the need for processing them into a form for ultimate disposal. Currently, Rocky Flats is processing the low-level solutions from bottles and tanks by direct cementation for storage and disposal. Plans for actinide precipitation of the high-level solutions are being finalized with an anticipated completion date of 2 to 3 yr. The solid residues present a more difficult challenge because of the numerous forms that these exist. Rocky Flats is developing several strategies to handle these materials for safe long-term storage and eventual disposal.

  10. Plutonium contamination in soils in open space and residential areas near Rocky Flats, Colorado

    SciTech Connect (OSTI)

    Litaor, M.I.

    1999-02-01

    Spatial analysis of the {sup 240}Pu:{sup 239}Pu isotopic ratio of 42 soil samples collected around Rocky Flats Plant near Golden, Colorado, was conducted to assess the effect of Rocky Flats Plant activity on the soil environment. Two probability maps that quantified the uncertainty of the spatial distribution of plutonium isotopic ratios were constructed using the sequential Gaussian simulation technique (sGs). Assuming a plutonium isotopic ratio range of 0.152 {+-} 0.003 to 0.169 {+-} 0.009 is characteristic to global fallout in Colorado, and a mean value of 0.155 is representative for the Rocky Flats Plant area, the main findings of the current work were (1) the areas northwest and southwest of Rocky Flats Plant exhibited a plutonium ratio {ge}0.155, this were minimally impacted by the plant activity; (2) he study area east of Rocky Flats Plant exhibited a plutonium isotopic ratio {le}0.155, which is a definitive indicator of Rocky Flats Plant-derived plutonium; and (3) inventory calculations across the study area exhibited large standard error of estimates. These errors were originated from the high variability in plutonium activity over a small sampling scale and the uncertainty in the global fallout isotopic ratio. Using the mean simulated estimates of plutonium isotopic ratio, coupled with plutonium activity measured at 11 soil pits and additional plutonium information published elsewhere, the plutonium loading on the open space and residential areas amounted to 111.2 GBq, with a standard error of estimate of 50.8 GBq.

  11. Decontamination and decommissioning of building 889 at Rocky Flats Environmental Technology Site

    SciTech Connect (OSTI)

    Dorr, K.A.; Hickman, M.E.; Henderson, B.J.; Sexton, R.J.

    1997-09-01

    At the Rocky Flats site, the building 889 decommissioning project was the first large-scale decommissioning project of a radiologically contaminated facility at Rocky Flats. The scope consisted of removal of all equipment and utility systems from the interior of the building, decontamination of interior building surfaces, and the demolition of the facility to ground level. Details of the project management plan, including schedule, engineering, cost, characterization methodologies, decontamination techniques, radiological control requirements, and demolition methods, are provided in this article. 1 fig., 3 tabs.

  12. Evaluation of an emergency response model for the Rocky Flats Plant: Charter

    SciTech Connect (OSTI)

    Not Available

    1991-01-01

    This Charter provides a basis for a cooperative, interagency effort to evaluate the Terrain-Responsive Atmospheric Code for emergency response and emergency planning for the Rocky Flats Plant. This document establishes the foundation for the project entitled, Evaluation of an Emergency Response Model for the Rocky Flats Plant'' (to be referred to as the Project). This document meets the following objectives: Identify the Project; establish the project management structure, organizational responsibilities, and organizational commitments for reaching the goals of the Project, and identify a process for model revision and revelation for acceptance. 2 figs.

  13. Radiological/Health physics program assessement at Rocky Flats, the process

    SciTech Connect (OSTI)

    Psomas, P.O.

    1996-06-01

    The Department of Energy, Rocky Flats Office, Safety and Health Group, Health Physics Team (HPT) is responsible for oversight of the Radiation Protection and Health Physics Program (RPHP) of the Integrating Management Contractor (IMC), Kaiser-Hill (K-H) operations at the Rocky Flats Environmental Technology Site (RFETS). As of 1 January 1996 the Rocky Flats Plant employed 300 DOE and 4,300 contractor personnel (K-H and their subcontractors). WSI is a subcontractor and provides plant security. To accomplish the RPHP program oversight HPT personnel developed a systematic methodology for performing a functional RPHP Assessment. The initial process included development of a flow diagram identifying all programmatic elements and assessment criteria documents. Formulation of plans for conducting interviews and performance of assessments constituted the second major effort. The generation of assessment reports was the final step, based on the results of this process. This assessment will be a 6 person-year effort, over the next three years. This process is the most comprehensive assessment of any Radiation Protection and Health Physics (RPHP) Program ever performed at Rocky Flats. The results of these efforts will establish a baseline for future RPHP Program assessments at RFETS. This methodology has been well-received by contractor personnel and creates no Privacy Act violations or other misunderstandings.

  14. Vitrification of plutonium at Rocky Flats the argument for a pilot plant

    SciTech Connect (OSTI)

    Moore, L.

    1996-05-01

    Current plans for stabilizing and storing the plutonium at Rocky Flats Plant fail to put the material in a form suitable for disposition and resistant to proliferation. Vitrification should be considered as an alternate technology. The vitrification should begin with a small-scale pilot plant.

  15. Tools for Closure Project and Contract Management: Development of the Rocky Flats Integrated Closure Project Baseline

    SciTech Connect (OSTI)

    Gelles, C. M.; Sheppard, F. R.

    2002-02-26

    This paper details the development of the Rocky Flats Integrated Closure Project Baseline - an innovative project management effort undertaken to ensure proactive management of the Rocky Flats Closure Contract in support of the Department's goal for achieving the safe closure of the Rocky Flats Environmental Technology Site (RFETS) in December 2006. The accelerated closure of RFETS is one of the most prominent projects within the Department of Energy (DOE) Environmental Management program. As the first major former weapons plant to be remediated and closed, it is a first-of-kind effort requiring the resolution of multiple complex technical and institutional challenges. Most significantly, the closure of RFETS is dependent upon the shipment of all special nuclear material and wastes to other DOE sites. The Department is actively working to strengthen project management across programs, and there is increasing external interest in this progress. The development of the Rocky Flats Integrated Closure Project Baseline represents a groundbreaking and cooperative effort to formalize the management of such a complex project across multiple sites and organizations. It is original in both scope and process, however it provides a useful precedent for the other ongoing project management efforts within the Environmental Management program.

  16. EIS-0064: Rocky Flats Plant Site, Jefferson County, Golden, Colorado (see also ERDA-1545-D)

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy developed this statement to evaluate the site specific environmental impacts of continuing to conduct nuclear weapons production activities at the Rocky Flats Plant; alternatives for the conduct of such activities; and environmental impacts of the U.S. policy to produce nuclear weapons.

  17. Rocky Flats Plant site environmental report for 1988, January through December 1988

    SciTech Connect (OSTI)

    Daugherty, N.M.

    1989-05-01

    This report documents the 1988 environmental surveillance program at the Rocky Flats Plant. The report includes an evaluation of plant compliance with all appropriate guides, environmental limits, and standards. Potential radiation dose to the public was calculated from average radionuclide concentrations measured at the plant property boundary and in surrounding communities. 37 refs., 14 figs., 32 tabs.

  18. Finding of no significant impact. Consolidation and interim storage of special nuclear material at Rocky Flats Environmental Technology Site

    SciTech Connect (OSTI)

    1995-06-01

    The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA -- 1060, for the consolidation, processing, and interim storage of Category I and II special nuclear material (SNM) in Building 371 at the Rocky Flats Environmental Technology Site (hereinafter referred to as Rocky Flats or Site), Golden, Colorado. The scope of the EA included alternatives for interim storage including the no action alternative, the construction of a new facility for interim storage at Rocky Flats, and shipment to other DOE facilities for interim storage.

  19. Rocky Flats Plant fluidized-bed incinerator. Engineering design and reference manual

    SciTech Connect (OSTI)

    Meile, L.J.

    1982-11-05

    The information in this manual is being presented to complete the documentation of the fluidized-bed incineration (FBI) process development at the Rocky Flats Plant. The information pertains to the 82-kg/hour demonstration unit at the Rocky Flats Plant. This document continues the presentation of design reference material in the aeas of equipment drawings, space requirements, and unit costs. In addition, appendices contain an operating procedure and an operational safety analysis of the process. The cost figures presented are based on 1978 dollars and have not been converted to a current dollar value. Also, the cost of modifications are not included, since they would be insignificant if they were incorporated into a new installation.

  20. Rocky Flats Environmental Technology Site Ecological Monitoring Program 1995 annual report

    SciTech Connect (OSTI)

    1995-05-31

    The Ecological Monitoring Program (ECMP) was established at the Rocky Flats Environmental Technology Site (Site) in September 1992. At that time, EcMP staff developed a Program Plan that was peer-reviewed by scientists from western universities before submittal to DOE RFFO in January 1993. The intent of the program is to measure several quantitative variables at different ecological scales in order to characterize the Rocky Flats ecosystem. This information is necessary to document ecological conditions at the Site in impacted and nonimpacted areas to determine if Site practices have had ecological impacts, either positive or negative. This information can be used by managers interested in future use scenarios and CERCLA activities. Others interested in impact analysis may also find the information useful. In addition, these measurements are entered into a database which will serve as a long-term information repository that will document long-term trends and potential future changes to the Site, both natural and anthropogenic.

  1. Rocky Flats 1990--91 winter validation tracer study: Volume 1

    SciTech Connect (OSTI)

    Brown, K.J.

    1991-10-01

    During the winter of 1990--91, North American Weather Consultants (NAWC) and its subcontractor, ABB Environmental Services (ABBES), conducted a Winter Validation Study (WVS) for EG&G Rocky Flats involving 12 separate tracer experiments conducted between February 3 and February 19, 1991. Six experiments were conducted during nighttime hours and four experiments were conducted during daytime hours. In addition, there was one day/night and one night/day transitional experiment conducted. The primary purpose of the WVS was to gather data to further the approval process for the Terrain Responsive Atmospheric Code (TRAC). TRAC is an atmospheric dispersion model developed and operated at the Department of Energy`s (DOE`s) Rocky Flats Plant (RFP) north of Denver, Colorado. A secondary objective was to gather data that will serve to validate the TRAC model physics.

  2. Solar-Powered Air Stripping at the Rocky Flats Site, Colorado - 12361

    SciTech Connect (OSTI)

    Boylan, John A.

    2012-07-01

    The U.S. Department of Energy's Rocky Flats Site (the Site), near Denver, Colorado, is a former nuclear weapons facility that was constructed beginning in 1951. With the end of the Cold War, the Site was cleaned up and closed in 2005. Four gravity-driven groundwater treatment systems were installed during cleanup, and their continued operation was incorporated into the final remedy for the Site. All utilities, including electrical power, were removed as part of this closure, so all Site electrical power needs are now met with small solar-powered systems. The Mound Site Plume Treatment System (MSPTS) was installed in 1998 as an innovative system based on zero-valent iron (ZVI). Groundwater flow from the Mound source area containing elevated concentrations of volatile organic compounds (VOCs), primarily in the tetrachloroethene (PCE)-trichloroethene (TCE) family of chlorinated solvents, is intercepted by a collection trench and routed to twin ZVI treatment cells. Later, in 2005, remediation of VOC-contaminated soils at a second up-gradient source area included adding an electron donor to the backfill to help stimulate biodegradation. This reduced concentrations of primary constituents but caused down-gradient groundwater to contain elevated levels of recalcitrant degradation byproducts, particularly cis-1,2-dichloroethene and vinyl chloride. A gravel drain installed as part of the 2005 remediation directs contaminated groundwater from this second source area to the MSPTS for treatment. This additional contaminant load, coupled with correspondingly reduced residence time within the ZVI media due to the increased flow rate, resulted in reduced treatment effectiveness. Elevated concentrations of VOCs were then detected in MSPTS effluent, as well as in surface water at the downstream performance monitoring location for the MSPTS. Subsequent consultations with the Site regulators led to the decision to add a polishing component to reduce residual VOCs in MSPTS effluent. Initially, several alternatives such as commercial air strippers and cascade aerators were evaluated; resulting cost estimates exceeded $100,000. After several simpler alternatives were considered and prototype testing was conducted, the existing effluent metering manhole was converted to house a spray-nozzle based, solar-powered air stripper, at a cost of approximately $20,000. About two-thirds of this cost was for the solar power system, which was initially designed to only provide power for 12 hours per day. Performance data are being collected and adjustments made to optimize the design, determine maintenance requirements, and establish power needs for continuous operation. Analytical data confirm the air stripper is sharply reducing concentrations of residual contaminants. (authors)

  3. Evaluation of a permeable reactive barrier technology for use at Rocky Flats Environmental Technology Site (RFETS)

    SciTech Connect (OSTI)

    DWYER,BRIAN P.

    2000-01-01

    Three reactive materials were evaluated at laboratory scale to identify the optimum treatment reagent for use in a Permeable Reactive Barrier Treatment System at Rocky Flats Environmental Technology Site (RFETS). The contaminants of concern (COCS) are uranium, TCE, PCE, carbon tetrachloride, americium, and vinyl chloride. The three reactive media evaluated included high carbon steel iron filings, an iron-silica alloy in the form of a foam aggregate, and a peculiar humic acid based sorbent (Humasorb from Arctech) mixed with sand. Each material was tested in the laboratory at column scale using simulated site water. All three materials showed promise for the 903 Mound Site however, the iron filings were determined to be the least expensive media. In order to validate the laboratory results, the iron filings were further tested at a pilot scale (field columns) using actual site water. Pilot test results were similar to laboratory results; consequently, the iron filings were chosen for the fill-scale demonstration of the reactive barrier technology. Additional design parameters including saturated hydraulic conductivity, treatment residence time, and head loss across the media were also determined and provided to the design team in support of the final design. The final design was completed by the Corps of Engineers in 1997 and the system was constructed in the summer of 1998. The treatment system began fill operation in December, 1998 and despite a few problems has been operational since. Results to date are consistent with the lab and pilot scale findings, i.e., complete removal of the contaminants of concern (COCs) prior to discharge to meet RFETS cleanup requirements. Furthermore, it is fair to say at this point in time that laboratory developed design parameters for the reactive barrier technology are sufficient for fuel scale design; however,the treatment system longevity and the long-term fate of the contaminants are questions that remain unanswered. This project along with others such as the Durango, CO and Monticello, UT reactive barriers will provide the data to determine the long-term effectiveness and return on investment (ROI) for this technology for comparison to the baseline pump and treat.

  4. Review of Beryllium Management Practices at Rocky Flats During Closure Operations

    Office of Environmental Management (EM)

    DOE-Environmental Management DOE - Complex Wide Review of Beryllium Management Practices at Rocky Flats During Closure Operations Challenge Beryllium (Be) metal is used by DOE in weapons production, as a reactor moderator or reflector, and as a fuel element cladding. Workers who are exposed to high concentrations of beryllium often develop acute beryllium disease caused by the inhalation of beryllium dust or particles which can cause Be sensitivity or chronic Be disease (CBD), a disabling and

  5. Historical Exposures to Chemicals at the Rocky Flats Nuclear Weapons Plant: A Pilot Retrospective Exposure Assessment

    SciTech Connect (OSTI)

    Janeen Denise Robertson

    1999-02-01

    In a mortality study of white males who had worked at the Rocky Flats Nuclear Weapons Plant between 1952 and 1979, an increased number of deaths from benign and unspecified intracranial neoplasms was found. A case-control study nested within this cohort investigated the hypothesis that an association existed between brain tumor death and exposure to either internally deposited plutonium or external ionizing radiation. There was no statistically significant association found between estimated radiation exposure from internally deposited plutonium and the development of brain tumors. Exposure by job or work area showed no significant difference between the cohort and the control groups. An update of the study found elevated risk estimates for (1) all lymphopoietic neoplasms, and (2) all causes of death in employees with body burdens greater than or equal to two nanocuries of plutonium. There was an excess of brain tumors for the entire cohort. Similar cohort studies conducted on worker populations from other plutonium handling facilities have not yet shown any elevated risks for brain tumors. Historically, the Rocky Flats Nuclear Weapons Plant used large quantities of chemicals in their production operations. The use of solvents, particularly carbon tetrachloride, was unique to Rocky Flats. No investigation of the possible confounding effects of chemical exposures was done in the initial studies. The objectives of the present study are to (1) investigate the history of chemical use at the Rocky Flats facility; (2) locate and analyze chemical monitoring information in order to assess employee exposure to the chemicals that were used in the highest volume; and (3) determine the feasibility of establishing a chemical exposure assessment model that could be used in future epidemiology studies.

  6. Waste drum gas generation sampling program at Rocky Flats during FY 1989

    SciTech Connect (OSTI)

    Roggenthen, D.K.; Nieweg, R.G.

    1990-10-01

    Rocky Flats Plant transuranic waste drums were sampled for gas composition. Glass, metal, graphite, and solidified inorganic sludge transuranic waste forms were sampled. A vacuum system was used to sample each layer of containment inside a waste drum, including individual waste bags. G values were calculated for the waste drums. G(H{sub 2}) was below 0.6 and G(Total) was below 1.3 for all waste forms discussed in this report. 5 refs., 3 figs., 3 tabs.

  7. Tomographic gamma scanning of uranium-contaminated waste at Rocky Flats

    SciTech Connect (OSTI)

    Mercer, D.J.; Betts, S.E.; Prettyman, T.H.; Rael, C.D.

    1998-12-31

    A tomographic gamma-ray scanning (TGS) instrument was deployed at Rocky Flats Environmental Technology Site (RFETS) to assist with the deactivation of Building 886. Many 208-L drums containing waste contaminated with highly enriched uranium were measured in order to certify these sites for shipment and disposal. This project marks a successful cooperation between RFETS and Los Alamos National Laboratory and is the first major field experience using TGS technology to assay uranium.

  8. Analysis of offsite emergency planning zones for the Rocky Flats Plant

    SciTech Connect (OSTI)

    Hodgin, C.R.; Daugherty, N.M.; Smith, M.L. . Rocky Flats Plant); Bunch, D.; Toresdahl, J.; Verholek, M.G. )

    1991-01-01

    The objective of this report is to fully document technical data and information that have been developed to support offsite emergency planning by the State of Colorado for potential accidents at the Rocky Flats Plant. Specifically, this report documents information and data that will assist the State of Colorado in upgrading its radiological emergency planning zones for Rocky Flats Plant. The Colorado Division of Disaster Emergency Services (DODES) and the Colorado Department of Health (CDH) represent the primary audience for this report. The secondary audience for this document includes the Rocky Flats Plant; federal, State, and local governmental agencies; the scientific community; and the interested public. Because the primary audience has a pre-existing background on the subject, this report assumes some exposure to emergency planning, health physics, and dispersion modeling on the part of the reader. The authors have limited their assumptions of background knowledge as much as possible, recognizing that the topics addressed in the report may be new to some secondary audiences.

  9. Environment, safety and Health Progress Assessment of the Rocky Flats Plant

    SciTech Connect (OSTI)

    Not Available

    1993-05-01

    This report documents the result of the US Department of Energy`s (DOE) Environment, Safety and Health (ES&H) Progress Assessment of the DOE Rocky Flats Plant (RFP) in Golden, Colorado. The assessment, which was conducted during the period of May 17 through May 28, 1993, included a selective review of the ES&H management systems and programs of the responsible DOE Headquarters Program Offices (Defense Programs (DP) and Environmental Restoration and Waste Management (EM)), the DOE Rocky Flats Office (RFO), and the site contractor, EG&G Rocky Flats, Inc. (EG&G). Despite the near constant state of flux under which RFP has been required to operate, the Progress Assessment Team has concluded that significant progress has been made in correcting the deficiencies identified in the 1989 Assessment and in responding responsibly to regulations, and DOE directives and guidance that have been issued since that time. The Team concluded that the improvements have been concentrated in the activities associated with plutonium facilities and in regulatory driven programs. Much remains to be done with respect to implementing on a sitewide basis those management systems that anchor an organization`s pursuit of continuous ES&H improvement. Furthermore the Team concluded that the pace of improvement has been constrained by a combination of factors that have limited the site`s ability to manage change in the pursuit of sitewide ES&H excellence.

  10. EIS-0277: Management of Certain Plutonium Residues and Scrub Alloy Stored at the Rocky Flats Environmental Technology Site

    Broader source: Energy.gov [DOE]

    This EIS evaluates the potential alternatives and impacts associated with a proposal to process certain plutonium residues and all of the scrub alloy currently stored at Rocky Flats. While ongoing...

  11. Supplement Analysis For Disposal of Certain Rocky Flats Plutonium-Bearing Materials at the Waste Isolation Pilot Plant

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Supplement Analysis For Disposal of Certain Rocky Flats Plutonium-Bearing Materials at the Waste Isolation Pilot Plant PURPOSE The U.S. Department of Energy (DOE) is proposing to revise its approach for managing approximately 0.97 metric tons (MT) of plutonium-bearing materials (containing about 0.18 MT of surplus plutonium) located at the Rocky Flats Environmental Technology Site (RFETS). DOE is proposing to repackage and transport these materials for direct disposal at the Waste Isolation

  12. Rocky Flats, Colorado, Site Quarterly Report of Site Surveillance and Maintenance Activities Third Quarter Calendar Year 2013

    Office of Legacy Management (LM)

    3 January 2014 LMS/RFS/S11334 This page intentionally left blank LMS/RFS/S11334 Rocky Flats, Colorado, Site Quarterly Report of Site Surveillance and Maintenance Activities Third Quarter Calendar Year 2013 January 2014 This page intentionally left blank U.S. Department of Energy Rocky Flats Site Quarterly Report of Site Surveillance and Maintenance Activities-3rd Quarter CY 2013 January 2014 Doc. No. S11334 Page i Contents Abbreviations

  13. Vascular flora of the Rocky Flats area, Jefferson County, Colorado, USA

    SciTech Connect (OSTI)

    Nelson, Jody K.

    2010-08-01

    The Rocky Flats Site (Site) is a U.S. Department of Energy (DOE) facility near Golden, Colorado that produced nuclear weapons components during the Cold War. Like many federal properties that have been off-limits to public access for decades, it has become a refugia for biodiversity as surrounding landscapes have been lost to agriculture and urbanization. A floristic study of the area was conducted on approximately 2,505 ha (6,189 ac) and includes the parcels currently managed and operated by DOE and the U.S. Fish and Wildlife Service (Rocky Flats National Wildlife Refuge). A flora of 630 species of vascular plants in 84 families and 340 genera was documented, including 12 species endemic to the southern Rocky Mountains and seven species considered rare or imperiled by the Colorado Natural Heritage Program. The flora of the Site is characterized by a predominantly Western North American floristic element, however, an Adventive floristic element contributes the greatest number of species. The vegetation is dominated by xeric tallgrass prairie and mixed grass prairie, with areas of wetland, shrubland, and riparian woodland.

  14. Vascular flora of the Rocky Flats area, Jefferson County, Colorado, USA

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Nelson, Jody K.

    2010-08-01

    The Rocky Flats Site (Site) is a U.S. Department of Energy (DOE) facility near Golden, Colorado that produced nuclear weapons components during the Cold War. Like many federal properties that have been off-limits to public access for decades, it has become a refugia for biodiversity as surrounding landscapes have been lost to agriculture and urbanization. A floristic study of the area was conducted on approximately 2,505 ha (6,189 ac) and includes the parcels currently managed and operated by DOE and the U.S. Fish and Wildlife Service (Rocky Flats National Wildlife Refuge). A flora of 630 species of vascular plants inmore » 84 families and 340 genera was documented, including 12 species endemic to the southern Rocky Mountains and seven species considered rare or imperiled by the Colorado Natural Heritage Program. The flora of the Site is characterized by a predominantly Western North American floristic element, however, an Adventive floristic element contributes the greatest number of species. The vegetation is dominated by xeric tallgrass prairie and mixed grass prairie, with areas of wetland, shrubland, and riparian woodland.« less

  15. Riparian and Upland Restoration at the U.S. Department of Energy Rocky Flats, Colorado, Site - 12360

    SciTech Connect (OSTI)

    Nelson, Jody K.

    2012-07-01

    Remedial investigation and cleanup at the Rocky Flats, Colorado, Site was completed in 2005. Uplands, riparian, and wetland habitat were disturbed during cleanup and closure activities and required extensive revegetation. Unavoidable disturbances to habitat of the Preble's meadow jumping mouse (a federally listed species) and wetlands required consultation with regulatory agencies and mitigation. Mitigation wetlands were constructed in two drainages, and a third developed naturally where a soil borrow area intercepted the groundwater table. During the 50-plus years of site operations, 12 ponds were constructed in three drainages to manage and retain runoff and sewage treatment plant discharges prior to release off site. A batch-release protocol has been used for the past several decades at the terminal ponds, which has affected the riparian communities downstream. To return the hydrologic regime to a more natural flow-through system similar to the pre-industrial-use conditions, seven interior dams (of 12) have been breached, and the remaining five dams are scheduled for breaching between 2011 and 2020. At the breached dams, the former open water areas have transformed to emergent wetlands, and the stream reaches have returned to a flow-through system. Riparian and wetland vegetation has established very well. The valves of the terminal ponds were opened in fall 2011 to begin flow-through operations and provide water to the downstream plant communities while allowing reestablishment of vegetation in the former pond bottoms prior to breaching. A number of challenges and issues were addressed during the revegetation effort. These included reaching an agreement on revegetation goals, addressing poor substrate quality and soil compaction problems, using soil amendments and topsoil, selecting seeds, determining the timing and location of revegetation projects relative to continuing closure activities, weed control, erosion control, revegetation project field oversight, and contractual limitations. A variety of ecological restoration techniques were conducted at the site to meet these challenges. These efforts have resulted in vegetation becoming well established in most locations. (author)

  16. A three-dimensional spatial model of plutonium in soil near Rocky Flats, Colorado

    SciTech Connect (OSTI)

    Webb, S.B.; Ibrahim, S.A.; Whicker, F.W.

    1997-08-01

    The horizontal and depth distribution of plutonium was measured in soil east of the Rocky Flats Environmental Technology Site (formerly the Rocky Flats Plant) near Denver, Colorado, during 1992-1994. The study area was centered on the eastern plume of plutonium contamination and included transacts extending from 0.2 km east of the primary origin of the contamination (the 903 Pad) to distances of up to 19 km northeast, east, southeast and south-southeast of the 903 Pad. Soil was collected in 3 cm layers down to 21 cm at exponentially increasing distances along the four transacts. Plutonium concentrations decreased rapidly with depth, distance from the 903 Pad, and angle from due east. Depth distributions were independent of distance and angle from the 903 Pad, and our profile model can be used to adjust to a common basis, historical measurements made from sampling to different depths. Based on a total of {approximately}1,400 independent measurements, mathematical functions were developed to describe the distance, directional, and depth relationships. These equations, combined with soil density and rock measurements, provided a new method to estimate the plutonium concentration or total deposition per unit area anywhere within the study area. Total deposition per unit area measurements at 50 sites provided an independent test of the model`s predictive accuracy. Sampling coefficients of variation based on replicate samples at the main sampling locations averaged 33%, but ranged from 12 to 98%. The analytical measurement coefficient of variation averaged 8%. Mean 0-3 cm soil concentrations of {sup 239}Pu among 10 Front Range {open_quotes}background{close_quotes} and 11 community locations near Rocky Flats were 2.1 and 2.3 Bq kg{sup -1}, respectively. 45 refs., 8 figs., 1 tab.

  17. Improvements to the Rocky Flats Metrology Laboratories Velocity Meter Calibration System

    SciTech Connect (OSTI)

    Abercrombie, K.R.

    1992-03-12

    The Rocky Flats Standards Laboratory has undertaken a project to improve calibration of air velocity meters by reducing the uncertainty of the Velocity Meter Calibration System. The project was accomplished by analyzing the governing equation in order to determine which areas within the system contributed most to the overall system uncertainty. Then, based upon this new analysis, new components were selected to replace the components identified in the analysis. Finally, the system was re-evaluated to determine the new systematic uncertainty for the system.

  18. HYDROGEN DATA FROM LOS ALAMOS [LANL] & SAVANNAH RIVER [SRC] & ROCKY FLATS [RFE] [SEC 1 & 2

    SciTech Connect (OSTI)

    DAYLEY, L.

    2001-11-19

    A DOE letter dated August 14, 2001 requested that a detailed analysis of the expected probability of accumulation of significant quantities of hydrogen gas in unvented drums and a plan and schedule for venting drums be prepared and submitted. In response to the letter a document was prepared that included data of hydrogen concentrations in TRU waste drums. Data was collected from Savannah River Site, Los Alamos National Laboratory, and Rocky Flats Environmental Technology Site. These data were analyzed to provide the basis for evaluating the probability that significant quantities of hydrogen will accumulate in the unvented TRU drums stored at Hanford.

  19. Implementation of IAEA safeguards at the Rocky Flats Environmental Technology Site

    SciTech Connect (OSTI)

    Giacomini, J.J.; Finleon, C.A.; Larsen, R.K.; Lucas, M.; Langner, D.

    1995-07-01

    When President Clinton spoke to the United Nations General Assembly in September 1993, he offered to place US excess defense nuclear material under International Atomic Energy Agency (IAEA) safeguards, before the next Nuclear Nonproliferation Treaty (NPT) Extension Conference. This set in motion a flurry of activities at three DOE facilities, including Rocky Flats Environmental Technology Site (Site). With general guidance from DOE Headquarters, the facility selected a suitable storage area, identified appropriate materials, and acquired the necessary instrumentation to implement full-scale IAEA safeguards on excess plutonium oxide.

  20. Rebaselining seismic risks for resumption of Building 707 plutonium operations at the Rocky Flats Plant

    SciTech Connect (OSTI)

    Elia, F. Jr.; Foppe, T.; Stahlnecker, E.

    1993-08-01

    Natural phenomena risks have been assessed for plutonium handling facilities at the Rocky Flats Plant, based on numerous studies performed for the Department of Energy Natural Phenomena Hazards Project. The risk assessment was originally utilized in the facilities Final Safety Analysis Reports and in subsequent risk management decisions. Plutonium production operations were curtailed in 1989 in order for a new operating contractor to implement safety improvements. Since natural phenomena events dominated risks to the public, a re-assessment of these events were undertaken for resumption of plutonium operations.

  1. Meteorological conditions during the winter validation study at Rocky Flats, Colorado: An overview

    SciTech Connect (OSTI)

    Hodgin, C.R.

    1991-11-06

    The objective for the Winter Validation Study was to gather field data for validation of the Terrain-Responsive Atmospheric Code (TRAC) under winter time meteorological conditions. Twelve tracer tests were conducted during a two-week period in February 1991. Each test lasted 12 hours, with releases of SF{sub 6} tracer from the Rocky Flats Plant near Golden, Colorado. The tests included ground-based and airborne sampling to 16 km from the release point. This presentation summarizes meteorological conditions during the testing period. Forty six viewgraphs are included.

  2. Overview of the Second Quarter 2011 Surveillance and Maintenance Report for the LM Rocky Flats Site

    Office of Legacy Management (LM)

    of the Second Quarter 2012 Surveillance and Maintenance Report for the LM Rocky Flats Site April-June 2012 Surface Water Monitoring and Operations 2 Second Quarter 2012 2 Pond Operations - Second Quarter 2012  Terminal Pond Discharges: * Valves at A-4, B-5, and C-2 were opened in 2011; all Terminal Ponds are now operated in a flow-through mode  Pond Levels: * As of June 30, 2012, the Terminal Ponds were holding approximately 5.0 MG (6.4 percent of capacity) 3 3 October 15, 2012, Pond

  3. Safety analyses performed in the Systematic Evaluation Program at Rocky Flats

    SciTech Connect (OSTI)

    Badwan, F.M.; Persinko, D.; Haga, P.B.

    1994-06-01

    Structures, systems, and components (SSC) at Rocky Flats were designed and put into operation before current standards and criteria applicable to these SSCs were developed. The purpose of the Systematic Evaluation Program (SEP) at Rocky Flats (RF) is to systematically compare the design of SSCs to current design requirements and assess the differences to assure that a balanced and integrated level of safety is achieved to support long-term operation of the facilities. The SEP is being performed in three phases. Phase 1, selection of technical subjects (topics) and development of evaluation plans is complete. Phase 2, comparison of the design of structures, systems and components to current design requirements (CDR), is in progress. It is being performed in two parts, Phase 2A and Phase 2B. An Integrated Assessment of the recommendations from Phase 2 will be performed in Phase 3. The RF SEP is not necessarily used to bring the RF facilities into compliance with newer standards, but to ensure that the safety issues addressed by current requirements either do not exist, are acceptably addressed by existing designs, or are addressed by backfit of existing standards into older facilities to the extent appropriate to the concern. For example, administrative controls may provide adequate resolution of issues addressed by design features in more modern facilities.

  4. Reactive barrier technologies for treatment of contaminated groundwater at Rocky Flats

    SciTech Connect (OSTI)

    Marozas, D.C.; Bujewski, G.E.; Castaneda, N.

    1997-12-31

    The U.S. Department of Energy (DOE) Office of Science and Technology Subsurface Contaminants Focus Area is supporting the investigation of reactive barrier technologies to mitigate the risks associated with mixed organic/radioactive waste at several DOE sites. Groundwater from a small contaminated plume at the Rocky Flats Environmental Technology Site (RFETS) is being used to evaluate passive reactive material treatment. Permeable reactive barriers which intercept contaminants and destroy the VOC component while containing radionuclides are attractive for a number of reasons relating to public and regulatory acceptance. In situ treatment keeps contaminants away from the earth`s surface, there is no above-ground treatment equipment that could expose workers and the public and operational costs are expected to be lower than currently used technologies. This paper will present results from preliminary site characterization and in-field small-scale column testing of reactive materials at RFETS. Successful demonstration is expected to lead to full-scale implementation of the technology at several DOE sites, including Rocky Flats.

  5. Stabilization of Rocky Flats combustible residues contaminated with plutonium metal and organic solvents

    SciTech Connect (OSTI)

    Bowen, S.M.; Cisneros, M.R.; Jacobson, L.L.; Schroeder, N.C.; Ames, R.L.

    1998-09-30

    This report describes tests on a proposed flowsheet designed to stabilize combustible residues that were generated at the Rocky Flats Environmental Technology Site (RFETS) during the machining of plutonium metal. Combustible residues are essentially laboratory trash contaminated with halogenated organic solvents and plutonium metal. The proposed flowsheet, designed by RFETS, follows a glovebox procedure that includes (1) the sorting and shredding of materials, (2) a low temperature thermal desorption of solvents from the combustible materials, (3) an oxidation of plutonium metal with steam, and (4) packaging of the stabilized residues. The role of Los Alamos National Laboratory (LANL) in this study was to determine parameters for the low temperature thermal desorption and steam oxidation steps. Thermal desorption of carbon tetrachloride (CCl{sub 4}) was examined using a heated air stream on a Rocky Flats combustible residue surrogate contaminated with CCl{sub 4}. Three types of plutonium metal were oxidized with steam in a LANL glovebox to determine the effectiveness of this procedure for residue stabilization. The results from these LANL experiments are used to recommend parameters for the proposed RFETS stabilization flowsheet.

  6. U-234/U-238 ratio: Qualitative estimate of groundwater flow in Rocky Flats monitoring wells

    SciTech Connect (OSTI)

    Laul, J.C.

    1994-02-01

    Groundwater movement through various pathways is the primary mechanism for the transport of radionuclides and trace elements in a water/rock interaction. About three dozen wells, installed in the Rocky Flats Plant (RFP) Solar Evaporation Ponds (SEP) area, are monitored quarterly to evaluate the extent of any lateral and downgradient migration of contaminants from the Solar Evaporation Ponds: 207-A; 207-B North, 207-B Center, and 207-B South; and 207-C. The Solar Ponds are the main source for the various contaminants: radionuclides (U-238, U-234, Pu-239, 240 and Am-241); anions; and trace metals to groundwaters. The U-238 concentrations in Rocky Flats groundwaters vary from <0.2 to 69 pCi/I (IpCi = 3 ug). However, the activity U-234/U-238 ratios are low and range mostly 1.2 to 2.7. The low activity ratios can be interpreted to suggest that the groundwaters are moving slow (

  7. Cement waste-form development for ion-exchange resins at the Rocky Flats Plant

    SciTech Connect (OSTI)

    Veazey, G.W.; Ames, R.L.

    1997-03-01

    This report describes the development of a cement waste form to stabilize ion-exchange resins at Rocky Flats Environmental Technology Site (RFETS). These resins have an elevated potential for ignition due to inadequate wetness and contact with nitrates. The work focused on the preparation and performance evaluation of several Portland cement/resin formulations. The performance standards were chosen to address Waste Isolation Pilot Plant and Environmental Protection Agency Resource Conservation and Recovery Act requirements, compatibility with Rocky Flats equipment, and throughput efficiency. The work was performed with surrogate gel-type Dowex cation- and anion-exchange resins chosen to be representative of the resin inventory at RFETS. Work was initiated with nonactinide resins to establish formulation ranges that would meet performance standards. Results were then verified and refined with actinide-containing resins. The final recommended formulation that passed all performance standards was determined to be a cement/water/resin (C/W/R) wt % ratio of 63/27/10 at a pH of 9 to 12. The recommendations include the acceptable compositional ranges for each component of the C/W/R ratio. Also included in this report are a recommended procedure, an equipment list, and observations/suggestions for implementation at RFETS. In addition, information is included that explains why denitration of the resin is unnecessary for stabilizing its ignitability potential.

  8. Waste drum gas generation sampling program at Rocky Flats during FY 1988

    SciTech Connect (OSTI)

    Roggenthen, D.K.; McFeeters, T.L.; Nieweg, R.G.

    1991-02-11

    Rocky Flats Plant Transuranic Waste Drums were sampled for gas composition. Combustibles, plastics, Raschig rings, solidified organic sludge, and solidified inorganic sludge transuranic waste forms were sampled. Plastic bag material and waste samples were also taken from some solidified sludge waste drums. A vacuum system was used to sample each layer of containment inside a waste drum, including individual waste bags. G values (gas generation) were calculated for the waste drums. Analytical results indicate that very low concentrations of potentially flammable or corrosive gas mixtures will be found in vented drums. G(H{sub 2}) was usually below 1.6, while G(Total) was below 4.0. Hydrogen permeability tests on different types of plastic waste bags used at Rocky Flats were also conducted. Polyvinylchloride was slightly more permeable to hydrogen than polyethylene for new or creased material. Permeability of aged material to hydrogen was slightly higher than for new material. Solidified organic and inorganic sludges were sampled for volatile organics. The analytical results from two drums of solidified organic sludges showed concentrations were above detection limits for four of the 36 volatile organics analyzed. The analytical results for four of the five solidified inorganic sludges show that concentrations were below detection limits for all volatile organics analyzed. 3 refs., 5 figs., 2 tabs.

  9. Evaluation of safety assessment methodologies in Rocky Flats Risk Assessment Guide (1985) and Building 707 Final Safety Analysis Report (1987)

    SciTech Connect (OSTI)

    Walsh, B.; Fisher, C.; Zigler, G.; Clark, R.A.

    1990-11-09

    FSARs. Rockwell International, as operating contractor at the Rocky Flats plant, conducted a safety analysis program during the 1980s. That effort resulted in Final Safety Analysis Reports (FSARs) for several buildings, one of them being the Building 707 Final Safety Analysis Report, June 87 (707FSAR) and a Plant Safety Analysis Report. Rocky Flats Risk Assessment Guide, March 1985 (RFRAG85) documents the methodologies that were used for those FSARs. Resources available for preparation of those Rocky Flats FSARs were very limited. After addressing the more pressing safety issues, some of which are described below, the present contractor (EG&G) intends to conduct a program of upgrading the FSARs. This report presents the results of a review of the methodologies described in RFRAG85 and 707FSAR and contains suggestions that might be incorporated into the methodology for the FSAR upgrade effort.

  10. History of Uranium-233(sup233U)Processing at the Rocky Flats Plant. In support of the RFETS Acceptable Knowledge Program

    SciTech Connect (OSTI)

    Moment, R.L.; Gibbs, F.E.; Freiboth, C.J.

    1999-04-01

    This report documents the processing of Uranium-233 at the Rocky Flats Plant (Rocky Flats Environmental Technology Site). The information may be used to meet Waste Isolation Pilot Plant (WIPP) Waste Acceptance Criteria (WAC)and for determining potential Uranium-233 content in applicable residue waste streams.

  11. Fiscal year 1990 Rocky Flats Plant Environmental Restoration program Current-Year Work Plan

    SciTech Connect (OSTI)

    Nielsen, T. ); Waage, E.; Miller, D. Corp., Boulder, CO )

    1990-01-01

    The Rocky Flats Plant (RFP) is a nuclear weapons manufacturing facility currently operated by EG G for the US Department of Energy (DOE). RFP is located at the foot of the Rocky Mountains in Jefferson Country, Colorado. The Fiscal Year 1990 (FY90) Current-Year Work Plan (CYWP) is intended to serve as a guidance document for the Environmental Restoration (ER) and RCRA Compliance programs that will be implemented at RFP. The CYWP provides in one document any cross-references necessary to understand the interrelationships between the CYWP and the DOE Five-Year Plan (FYP), Site-Specific Plan (SSP), and other related documents. The scope of this plan includes comparison of planned FY90 ER activities to those actually achieved. The CYWP has been updated to include Colorado Department of Health (CDH), US Environmental Protection Agency (EPA), and DOE Inter-Agency Agreement ER activities. It addresses hazardous wastes, radioactive wastes, mixed wastes (radioactive and hazardous), and sanitary wastes. The CYWP also addresses facilities and sites contaminated with or used in management of those wastes.

  12. Microwave vitrification of Rocky Flats hydroxide precipitation sludge, Building 774. Progress report

    SciTech Connect (OSTI)

    Eschen, V.G.; Sprenger, G.S.; Fenner, G.S.; Corbin, I.E.

    1995-04-01

    This report describes the first set of experiments performed on transuranic (TRU) precipitation sludge produced in Building 774, to determine the operating parameters for the microwave vitrification process. Toxicity Characteristic Leach Procedure (TCLP) results of the raw sludge showed concentrations of lead, silver and cadmium which were in excess of land disposal restrictions (LDR). Crushed, borosilicate glass was used as a frit source to produce a highly desirable, vitrified, product that required less energy to produce. TCLP testing, of microwaved samples, showed favorable results for 40 and 50% waste loading. The results of this study are encouraging and support the development of microwave vitrification technology for the treatment of various mixed waste streams at Rocky Flats Environmental Technology Site. However, additional experiments are required to fully define the operating parameters for a production-scale system.

  13. Denitration of Rocky Flats Ion-Exchange Resins: Recommendation of Denitration Processes, October 19, 1995

    SciTech Connect (OSTI)

    Jacob Espinoza; Mary Barr; Wayne Smith

    1998-12-01

    Resin denitration via anion-exchange is an implementable process that can effectively mitigate the hazards associated with stored resins in which the bulk of the nitrate consists of an "exchangeable nitrate" ionically bound to the cationic sites of the anion-exchange resins. Salicylate has been selected as the exchange anion of choice because of its superior selectivity for the Rocky Flats resins and its unique potential for comprehensive recovery and recycle. This report outlines a single recommended resin denigration procedure that is reasonably independent of the resin composition and the current stored form. This procedure is not optimized but rather seeks to `over-treat' the resins so that a single procedure works for the variety of stored resins. The recommended treatment with sodium salicylate reduces resins by 95-99+% the measured exothermic behavior of the ion-exchange.

  14. Retrospective beryllium exposure assessment at the Rocky Flats Environmental Technology site

    SciTech Connect (OSTI)

    Barnard, A.E.; Torma-Krajewski, J.; Viet, S.M.

    1997-05-01

    Since the 1960`s, beryllium machining was performed to make nuclear weapon components at the Department of Energy (DOE) Rocky Flats Plant. Beryllium exposure was assessed via fixed airhead (FAH) sampling in which the filter cassette was affixed to the machine, generally within a few feet of the worker`s breathing zone. Approximately 500,000 FAH samples were collected for beryllium over three decades. From 1984 to 1987, personal breathing zone (PBZ) samples were also collected as part of the evaluation of a new high velocity/low volume local exhaust ventilation (HV/LV LEV) system. The purpose of this study was to determine how the two types of sampling data could be used for an exposure assessment in the beryllium shop.

  15. Analysis of offsite Emergency Planning Zones (EPZs) for the Rocky Flats Plant. [Contains glossary

    SciTech Connect (OSTI)

    Not Available

    1990-08-01

    A quality assurance plan (QAP) is a documented description or a listing of the controls to be implemented to assure that an operation or activity is accomplished in a consistent manner and in accordance with requirements. Federal, state, and local governments require emergency planning for facilities that may affect the public in the event of an accidental release of nuclear or hazardous materials. One of the purposes of this EG G Rocky Flats Plant (RFP) Analysis of Offsite Emergency Planning Zones (EPZ) project is to identify the EPZs where actions could be necessary to protect public health. The RFP EPZ project is developing an interim basis for potential sheltering and evacuation recommendations in the event of an accidental release of radionuclides to the atmosphere from this facility. Also, RFP is developing EPZs for accidental releases of major nonradiological hazardous substances to the atmosphere, and will analyze the impacts of an unplanned surface water release from the facility.

  16. Cementation and solidification of miscellaneous mixed wastes at the Rocky Flats Environmental Technology Site

    SciTech Connect (OSTI)

    Phillips, J.A.; Semones, G.B.

    1995-02-01

    The Rocky Flats Environmental Technology Site produces a variety of wastes which are amenable to micro-encapsulation in cement Portland cement is an inexpensive and readily available material for this application. The Waste Projects (WP) group at Rocky Flats evaluated cementation to determine its effectiveness in encapsulating several wastes. These included waste analytical laboratory solutions, incinerator ash, hydroxide precipitation sludge, and an acidic solution from the Delphi process (a chemical oxidation technology being evaluated as an alternative to incineration). WP prepared surrogate wastes and conducted designed experiments to optimize the cement formulation for the waste streams. These experiments used a Taguchi or factorial experimental design, interactions between the variables were also considered in the testing. Surrogate waste samples were spiked with various levels of each of six Resource Conservation and Recovery Act (RCRA) listed metals (Cd, Cr, Ba, Pb, Ni, and Ag), cemented using the optimized formulation, and analyzed for leach resistance using the Toxicity Characteristic Leaching Procedure (TCLP). The metal spike levels chosen were based on characterization data, and also based on an estimate of the highest levels of contaminants suspected in the waste. This paper includes laboratory test results for each waste studied. These include qualitative observations as well as quantitative data from TCLP analyses and environmental cycling studies. The results from these experiments show that cement stabilization of the different wastes can produce final waste forms which meet the current RCRA Land Disposal Restriction (LDR) requirements. Formulations that resulted in LDR compliant waste forms are provided. The volume increases associated with cementation are also lower than anticipated. Future work will include verification studies with actual mixed radioactive waste as well as additional formulation development studies on other waste streams.

  17. Vitrification of simulated radioactive Rocky Flats plutonium containing ash residue with a Stir Melter System

    SciTech Connect (OSTI)

    Marra, J.C.; Kormanyos, K.R.; Overcamp, T.J.

    1996-10-01

    A demonstration trial has been completed in which a simulated Rocky Flats ash consisting of an industrial fly-ash material doped with cerium oxide was vitrified in an alloy tank Stir-Melter{trademark} System. The cerium oxide served as a substitute for plutonium oxide present in the actual Rocky Flats residue stream. The glass developed falls within the SiO{sub 2} + Al{sub 2}O{sub 3}/{Sigma}Alkali/B{sub 2}O{sub 3} system. The glass batch contained approximately 40 wt% of ash, the ash was modified to contain {approximately} 5 wt% CeO{sub 2} to simulate plutonium chemistry in the glass. The ash simulant was mixed with water and fed to the Stir-Melter as a slurry with a 60 wt% water to 40 wt% solids ratio. Glass melting temperature was maintained at approximately 1,050 C during the melting trials. Melting rates as functions of impeller speed and slurry feed rate were determined. An optimal melting rate was established through a series of evolutionary variations of the control variables` settings. The optimal melting rate condition was used for a continuous six hour steady state run of the vitrification system. Glass mass flow rates of the melter were measured and correlated with the slurry feed mass flow. Melter off-gas was sampled for particulate and volatile species over a period of four hours during the steady state run. Glass composition and durability studies were run on samples collected during the steady state run.

  18. Observed Impacts on Plants Sprayed with Tordon 22K at Rocky Flats Environmental Technology Site

    SciTech Connect (OSTI)

    Nelson, Jody K.

    1999-10-21

    Newsletter article for The Central Rockies Chapter of the Society for Ecological Restoration newsletter

  19. Case History of a Clean Water Act Compliance Agreement at the Rocky Flats Environmental Technology Site near Golden, Colorado

    SciTech Connect (OSTI)

    Thompson, J.S.

    1995-08-01

    A major Clean Water Act (CWA) Federal Facilities Compliance Agreement was signed on March 25, 1991 by the US Department of Energy, Rocky Flats Field Office (DOE, RFFO) and the Water Enforcement Division of the Environmental Protection Agency (EPA), Region VIII. The agreement revised the Rocky Flats Plant`s National Pollutant Discharge Elimination System (NPDES) permit and arose from pemittee-requested changes in effluent monitoring points and permit violations, most notably the February 22, 1989 Chromic Acid Incident. The Rocky Flats Plant, now called the Rocky Flats Environmental Technology Site (Site) near Golden Colorado was operated at that time by Rockwell International Corporation, who later plead guilty to six misdemeanor and felony counts of the CWA (the aforementioned NPDES permit violations) and paid a $4 million fine on March 26, 1992. The Compliance Agreement, hereafter referred to as the NPDES FFCA, called for three separate remedial action plans and contained a schedule for their submittal to the EPA. The compliance plans focussed on: (1) Waste Water Treatment Plant (WWTP) performance upgrades, (2) source control and surface water protection, and (3) characterization of the impacts from past sludge disposal practices. Projects that implemented the compliance plans were initiated soon after submittal to the EPA and are forecast to complete in 1997 at a total cost of over $35 million. This paper presents a case history of NPDES FFCA compliance projects and highlights the successes, failures, and lessons learned.

  20. Rocky Flats Site, Colorado, Quarterly Report of Site Surveillance and Maintenance Activities Third Quarter Calendar Year 2013

    Office of Legacy Management (LM)

    Quarterly Report of Site Surveillance and Maintenance Activities Second Quarter Calendar Year 2015 October 2015 LMS/RFS/S13352 This page intentionally left blank U.S. Department of Energy Rocky Flats Site Quarterly Report of Site Surveillance and Maintenance Activities-2nd Quarter CY 2015 October 2015 Doc. No. S13352 Page i Contents Abbreviations ................................................................................................................................. iv 1.0 Introduction

  1. Rocky Flats, Colorado, Site Quarterly Report of Site Surveillance and Maintenance Activities Third Quarter Calendar Year 2013

    Office of Legacy Management (LM)

    Third Quarter Calendar Year 2014 January 2015 LMS/RFS/S12555 This page intentionally left blank U.S. Department of Energy Rocky Flats Site Quarterly Report of Site Surveillance and Maintenance Activities-3rd Quarter CY 2014 January 2015 Doc. No. S12555 Page i Contents Abbreviations ................................................................................................................................. iv 1.0 Introduction

  2. Rocky Flats, Colorado, Site Quarterly Report of Site Surveillance and Maintenance Activities Third Quarter Calendar Year 2013

    Office of Legacy Management (LM)

    Site Surveillance and Maintenance Activities First Quarter Calendar Year 2015 July 2015 LMS/RFS/S13091 This page intentionally left blank U.S. Department of Energy Rocky Flats Site Quarterly Report of Site Surveillance and Maintenance Activities-1st Quarter CY 2015 July 2015 Doc. No. S13091 Page i Contents Abbreviations ................................................................................................................................. iv 1.0 Introduction

  3. Rocky Flats, Colorado, Site Quarterly Report of Site Surveillance and Maintenance Activities Third Quarter Calendar Year 2015

    Office of Legacy Management (LM)

    Colorado, Quarterly Report of Site Surveillance and Maintenance Activities Third Quarter Calendar Year 2015 January 2016 LMS/RFS/S13687 This page intentionally left blank U.S. Department of Energy Rocky Flats Site Quarterly Report of Site Surveillance and Maintenance Activities-3rd Quarter CY 2015 January 2016 Doc. No. S13687 Page i Contents Abbreviations ................................................................................................................................. iv 1.0

  4. RCRA Part B permit modifications for cost savings and increased flexibility at the Rocky Flats Environmental Technology Site

    SciTech Connect (OSTI)

    Jierree, C.; Ticknor, K.

    1996-10-01

    With shrinking budgets and downsizing, a need for streamlined compliance initiatives became evident at the Rocky Flats Environmental Technology Site (RFETS). Therefore, Rocky Mountain Remediation Services (RMRS) at the RFETS successfully and quickly modified the RFETS RCRA Part B Permit to obtain significant cost savings and increased flexibility. This `was accomplished by requesting operations personnel to suggest changes to the Part B Permit which did not diminish overall compliance and which would be most. cost beneficial. The U.S. Department of Energy (DOE) subsequently obtained approval of those changes from the Colorado Department of Public Health and the Environment (CDPHE).

  5. EM's Cleanup Mission: 16 Sites in 11 States Remaining | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy EM's Cleanup Mission: 16 Sites in 11 States Remaining EM's Cleanup Mission: 16 Sites in 11 States Remaining At the end of fiscal year 2013, EM completed cleanup and closed 90 sites in 28 states. This included cleanup and closure of 85 smaller sites and five major nuclear sites: Rocky Flats, Fernald, Mound, Pinellas, and Weldon Spring. PDF icon Small Site Closures More Documents & Publications Completed Sites Listing Annual DOE Occupational Radiation Exposure | 1998 Report

  6. DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy for Environmental Management. "As the largest DOE ... liability into a community asset, completing the project ... providing access to a wealth of information and resources. ...

  7. Evaluation of remedial alternatives for the Solar Ponds Plume, Rocky Flats Environmental Technology Site

    SciTech Connect (OSTI)

    Hranac, K.C.; Chromec, F.W.; Fiehweg, R.; Hopkins, J.

    1998-07-01

    This paper describes the process used to select a remedial alternative for handling contaminated groundwater emanating from the Solar Evaporation Ponds (Solar Ponds) at the Rocky Flats Environmental Technology Site (RFETS) and prevent it from reaching the nearest surface water body, North Walnut Creek. Preliminary results of field investigations conducted to provide additional information for the alternatives analysis are also presented. The contaminated groundwater is referred to as the Solar Ponds Plume (SPP). The primary contaminants in the SPP are nitrate and uranium; however, some metals exceed the site action levels at several locations and volatile organic compounds, originating from other sources, also have been detected. Currently the SPP, local surface water runoff, and infiltrated precipitation are collected by a trench system located downgradient of the Solar Ponds and pumped to three storage tanks. The water (two to three million gallons annually) is then pumped to an on-site treatment plant for evaporation at an approximate cost of $7.57 per liter.

  8. Environmental Aspects of Two Volatile Organic Compound Groundwater Treatment Designs at the Rocky Flats Site - 13135

    SciTech Connect (OSTI)

    Michalski, Casey C.; DiSalvo, Rick; Boylan, John

    2013-07-01

    DOE's Rocky Flats Site in Colorado is a former nuclear weapons production facility that began operations in the early 1950's. Because of releases of hazardous substances to the environment, the federally owned property and adjacent offsite areas were placed on the CERCLA National Priorities List in 1989. The final remedy was selected in 2006. Engineered components of the remedy include four groundwater treatment systems that were installed before closure as CERCLA-accelerated actions. Two of the systems, the Mound Site Plume Treatment System and the East Trenches Plume Treatment System, remove low levels of volatile organic compounds using zero-valent iron media, thereby reducing the loading of volatile organic compounds in surface water resulting from the groundwater pathway. However, the zero-valent iron treatment does not reliably reduce all volatile organic compounds to consistently meet water quality goals. While adding additional zero-valent iron media capacity could improve volatile organic compound removal capability, installation of a solar powered air-stripper has proven an effective treatment optimization in further reducing volatile organic compound concentrations. A comparison of the air stripper to the alternative of adding additional zero-valent iron capacity to improve Mound Site Plume Treatment System and East Trenches Plume Treatment System treatment based on several key sustainable remediation aspects indicates the air stripper is also more 'environmentally friendly'. These key aspects include air pollutant emissions, water quality, waste management, transportation, and costs. (authors)

  9. Acceptable knowledge document for INEEL stored transuranic waste -- Rocky Flats Plant waste. Revision 2

    SciTech Connect (OSTI)

    1998-01-23

    This document and supporting documentation provide a consistent, defensible, and auditable record of acceptable knowledge for waste generated at the Rocky Flats Plant which is currently in the accessible storage inventory at the Idaho National Engineering and Environmental Laboratory. The inventory consists of transuranic (TRU) waste generated from 1972 through 1989. Regulations authorize waste generators and treatment, storage, and disposal facilities to use acceptable knowledge in appropriate circumstances to make hazardous waste determinations. Acceptable knowledge includes information relating to plant history, process operations, and waste management, in addition to waste-specific data generated prior to the effective date of the RCRA regulations. This document is organized to provide the reader a comprehensive presentation of the TRU waste inventory ranging from descriptions of the historical plant operations that generated and managed the waste to specific information about the composition of each waste group. Section 2 lists the requirements that dictate and direct TRU waste characterization and authorize the use of the acceptable knowledge approach. In addition to defining the TRU waste inventory, Section 3 summarizes the historical operations, waste management, characterization, and certification activities associated with the inventory. Sections 5.0 through 26.0 describe the waste groups in the inventory including waste generation, waste packaging, and waste characterization. This document includes an expanded discussion for each waste group of potential radionuclide contaminants, in addition to other physical properties and interferences that could potentially impact radioassay systems.

  10. The Rocky Flats Plant Waste Stream and Residue Identification and Characterization Program (WSRIC): Progress and achievements

    SciTech Connect (OSTI)

    Ideker, V.L.; Doyle, G.M.

    1994-02-01

    The Waste Stream and Residue Identification and Characterization (WSRIC) Program, as described in the WSRIC Program Description delineates the process knowledge used to identify and characterize currently-generated waste from approximately 5404 waste streams originating from 576 processes in 288 buildings at Rocky Flats Plant (RFP). Annual updates to the WSRIC documents are required by the Federal Facilities Compliance Agreement between the US Department of Energy, the Colorado Department of Health and the Environmental Protection Agency. Accurate determination and characterization of waste is a crucial component in RFP`s waste management strategy to assure compliance with Resource Conservation and Recovery Act (RCRA) storage and treatment requirements, as well as disposal acceptance criteria. The WSRIC Program was rebaselined in September 1992, and serves as the linchpin for documenting process knowledge in RFP`s RCRA operating record. Enhancements to the WSRIC include strengthening the waste characterization rationale, expanding WSRIC training for waste generators, and incorporating analytical information into the WSRIC building books. These enhancements will improve credibility with the regulators and increase waste generators` understanding of the basis for credible waste characterizations.

  11. TREATMENT OF PLUTONIUM- AND URANIUM-CONTAMINATED OIL FROM ROCKY FLATS ENVIRONMENTAL TECHNOLOGY SITE

    SciTech Connect (OSTI)

    Klasson, KT

    2002-12-05

    A removal method for plutonium and uranium has been tested at the Rocky Flats Environmental Technology Site (RFETS). This alternative treatment technology is applicable to U.S. Department of Energy (DOE) organics (mainly used pump oil) contaminated with actinides. In our studies, greater than 70% removal of the actinides was achieved. The technology is based on contacting the oil with a sorbent powder consisting of a surface modified mesoporous material. The SAMMS (Self-Assembled Monolayers on Mesoporous Support) technology was developed by the Pacific Northwest National Laboratory for removal and stabilization of RCRA (i.e., lead, mercury, cadmium, silver, etc.) and actinides in water and for removal of mercury from organic solvents [1, 2]. The SAMMS material is based on self-assembly of functionalized monolayers on mesoporous oxide surfaces. The unique mesoporous oxide support provides a high surface area, thereby enhancing the metal-loading capacity. The testing described in this report was conducted on a small scale but larger-scale testing of the technology has been performed on mercury-contaminated oil without difficulty [3].

  12. SCO shipments from Rocky Flats - Experience and current practice [Surface Contaminated Object

    SciTech Connect (OSTI)

    Bracken, Gary; Morris, Robert L.

    2001-01-10

    Decommissioning activities at Rocky Flats Environmental Technology Site (RFETS) are expected to generate approximately 251,000 cubic meters of low-level radioactive waste. Almost half of this will be characterized and shipped as the Department of Transportation ''Surface Contaminated Object'' (SCO) shipping class. In the 2 years since an SCO characterization method was implemented, almost 11,000 of the 18,000 cubic meters of low-level waste were SCO. RFETS experience to-date using an SCO waste characterization method has shown significant time and cost savings, reduced errors, and enhanced employee safety. SCO waste is characterized prior to packaging, near the point of generation, by any of the site's 300 Radiological Control Technicians using inexpensive radiological control survey instruments. This reduces on-site waste container moves and eliminates radiometric analysis at centrally located drum or crate counters. Containers too large for crate counters can also be characterized. Current instrumentation is not adequate to take full advantage of the SCO regulations. Future improvements in the SCO characterization and shipping process are focused on use of larger and/or reusable containers, extended-range instruments, and additional statistical methods, so that the full extent of the SCO regulations can be used.

  13. Resumption of thermal stabilization of plutonium oxide in Building 707, Rocky Flats Plant, Golden, Colorado. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    The Department of Energy is proposing thermal stabilization to enhance the safe storage of plutonium at Rocky Flats Plant until decisions are made on long-term storage and disposition of the material. The proposed action is to resume thermal stabilization of pyrophoric plutonium in Building 707 at Rocky Flats Plant. Thermal stabilization would heat the pyrophoric plutonium under controlled conditions in a glovebox furnace to promote full oxidation and convert the material into stable plutonium oxide in the form of PuO{sub 2}. Other activities associated with thermal stabilization would include post-stabilization characterization of non-pyrophoric plutonium and on-site movement of pyrophoric and non-pyrophoric plutonium. This report covers; purpose and need; proposed action; alternatives to the proposed action; affected environment; environmental effects of proposed action and no action alternative; agencies and person consulted; and public participation.

  14. Disposition of Uranium -233 (sup 233U) in Plutonium Metal and Oxide at the Rocky Flats Environmental Technology Site

    SciTech Connect (OSTI)

    Freiboth, Cameron J.; Gibbs, Frank E.

    2000-03-01

    This report documents the position that the concentration of Uranium-233 ({sup 233}U) in plutonium metal and oxide currently stored at the DOE Rocky Flats Environmental Technology Site (RFETS) is well below the maximum permissible stabilization, packaging, shipping and storage limits. The {sup 233}U stabilization, packaging and storage limit is 0.5 weight percent (wt%), which is also the shipping limit maximum. These two plutonium products (metal and oxide) are scheduled for processing through the Building 371 Plutonium Stabilization and Packaging System (PuSPS). This justification is supported by written technical reports, personnel interviews, and nuclear material inventories, as compiled in the ''History of Uranium-233 ({sup 233}U) Processing at the Rocky Flats Plant In Support of the RFETS Acceptable Knowledge Program'' RS-090-056, April 1, 1999. Relevant data from this report is summarized for application to the PuSPS metal and oxide processing campaigns.

  15. The September 1957 Rocky Flats fire: A guide to record series of the Department of Energy and its contractors

    SciTech Connect (OSTI)

    1995-07-19

    The primary purpose of this guide is to help the DOE locate and make available information relating to the 1957 Rocky Flats fire. The records are arranged into six categories: administrative and general; facilities and equipment; production and materials handling; waste management; workplace and environmental monitoring; and employee occupational exposure and health. A brief explanation of each category follows. The administrative and general section pertains to the administration of individual contractor organizations and DOE divisions at Rocky Flats. It also contains records which encompass several different subject areas and therefore can not be placed in a single category. The facilities and equipment category relates to the routine construction and maintenance of plant buildings as well as the purchase and installation of equipment. The production and materials handling records relate primarily to the inventory and production of nuclear materials and weapons components. The waste management records series found under this heading relate to the storage, handling, treatment, and disposal of radioactive, chemical or mixed materials produced or used at Rocky Flats. The records consist mostly of waste sampling and shipment records. The workplace and environmental monitoring records series found in this section pertain to monitoring of the workplace. The section also includes records that document efforts to monitor the environment outside of buildings, either onsite or offsite. Records in this category consist of sampling data and environmental impact reports. The employee occupational exposure and health section pertains to documentation relating to the health and occupational exposures of employees and visitors at Rocky Flats. Records series consist generally of dosimeter data, radiation exposure records, and medical records. Many of the records contain personal data pertaining to individual employees and may therefore be Privacy Act systems and records.

  16. An assessment of criticality safety at the Department of Energy Rocky Flats Plant, Golden, Colorado, July--September 1989

    SciTech Connect (OSTI)

    Mattson, Roger J.

    1989-09-01

    This is a report on the 1989 independent Criticality Safety Assessment of the Rocky Flats Plant, primarily in response to public concerns that nuclear criticality accidents involving plutonium may have occurred at this nuclear weapon component fabrication and processing plant. The report evaluates environmental issues, fissile material storage practices, ventilation system problem areas, and criticality safety practices. While no evidence of a criticality accident was found, several recommendations are made for criticality safety improvements. 9 tabs.

  17. Report on "Audit of the Contractor Incentive Programs at the Rocky Flats Environmental Technology Site, IG-0411

    Energy Savers [EERE]

    August 13, 1997 MEMORANDUM FOR THE SECRETARY FROM: John C. Layton Inspector General SUBJECT: INFORMATION: Report on "Audit of the Contractor Incentive Programs at the Rocky Flats Environmental Technology Site" BACKGROUND: The Department of Energy (Department) is using performance-based contracts to solve problems associated with its traditional management and operating contracts. These performance-based contracts are to include cost reduction incentive programs to motivate contractors

  18. Analysis of offsite emergency planning zones for the Rocky Flats Plant. Evaluation of radiological materials, Volume 1

    SciTech Connect (OSTI)

    Hodgin, C.R.; Daugherty, N.M.; Smith, M.L.; Bunch, D.; Toresdahl, J.; Verholek, M.G.

    1991-01-01

    The objective of this report is to fully document technical data and information that have been developed to support offsite emergency planning by the State of Colorado for potential accidents at the Rocky Flats Plant. Specifically, this report documents information and data that will assist the State of Colorado in upgrading its radiological emergency planning zones for Rocky Flats Plant. The Colorado Division of Disaster Emergency Services (DODES) and the Colorado Department of Health (CDH) represent the primary audience for this report. The secondary audience for this document includes the Rocky Flats Plant; federal, State, and local governmental agencies; the scientific community; and the interested public. Because the primary audience has a pre-existing background on the subject, this report assumes some exposure to emergency planning, health physics, and dispersion modeling on the part of the reader. The authors have limited their assumptions of background knowledge as much as possible, recognizing that the topics addressed in the report may be new to some secondary audiences.

  19. Evaluation of prospective hazardous waste treatment technologies for use in processing low-level mixed wastes at Rocky Flats

    SciTech Connect (OSTI)

    McGlochlin, S.C.; Harder, R.V.; Jensen, R.T.; Pettis, S.A.; Roggenthen, D.K.

    1990-09-18

    Several technologies for destroying or decontaminating hazardous wastes were evaluated (during early 1988) as potential processes for treating low-level mixed wastes destined for destruction in the Fluidized Bed Incinerator. The processes that showed promise were retained for further consideration and placed into one (or more) of three categories based on projected availability: short, intermediate, and long-term. Three potential short-term options were identified for managing low-level mixed wastes generated or stored at the Rocky Flats Plant (operated by Rockwell International in 1988). These options are: (1) Continue storing at Rocky Flats, (2) Ship to Nevada Test Site for landfill disposal, or (3) Ship to the Idaho National Engineering Laboratory for incineration in the Waste Experimental Reduction Facility. The third option is preferable because the wastes will be destroyed. Idaho National Engineering Laboratory has received interim status for processing solid and liquid low-level mixed wastes. However, low-level mixed wastes will continue to be stored at Rocky Flats until the Department of Energy approval is received to ship to the Nevada Test Site or Idaho National Engineering Laboratory. Potential intermediate and long-term processes were identified; however, these processes should be combined into complete waste treatment systems'' that may serve as alternatives to the Fluidized Bed Incinerator. Waste treatment systems will be the subject of later work. 59 refs., 2 figs.

  20. The Department of Energy`s Rocky Flats Plant: A guide to record series useful for health related research. Volume 4: Production and materials handling

    SciTech Connect (OSTI)

    1995-08-01

    This is the fourth in a series of seven volumes which constitute a guide to records of the Rocky Flats Plant useful for conducting health-related research. The primary purpose of Volume 4 is to describe record series pertaining to production and materials handling activities at the Department of Energy`s (DOE) Rocky Flats Plant, now named the Rocky Flats Environmental Technology Site, near Denver, Colorado. History Associates Incorporated (HAI) prepared this guide as part of its work as the support services contractor for DOE`s Epidemiologic Records Inventory Project. This introduction briefly describes the Epidemiologic Records Inventory Project and HAI`s role in the project, provides a history of production and materials handling practices at Rocky Flats, and identifies organizations contributing to production and materials handling policies and activities. Other topics include the scope and arrangement of the guide and the organization to contact for access to these records.

  1. Build Rocky Flats Environmental Technology site production prototype modular treatment system for stand alone core capability for residue unpack, sort, assay, repack

    SciTech Connect (OSTI)

    Hildner, R.A.; Zygmunt, S.J.

    1997-01-01

    This document describes a portable and modular suit of equipment that upfront and near-term accomplishes a sorting process that documents and removes Rocky Flats Environmental Technology Site (RFETS) residue and waste from site inventory.

  2. Understanding Contaminant Transport Pathways at Rocky Flats - A Basis for the Remediation Strategy

    SciTech Connect (OSTI)

    Paton, Ian

    2008-01-15

    The Rocky Flats Environmental Technology Site (RFETS) is a Department of Energy facility located approximately 16 miles northwest of Denver, Colorado. Processing and fabrication of nuclear weapons components occurred at Rocky Flats from 1952 through 1989. Operations at the Site included the use of several radionuclides, including plutonium-239/240 (Pu), americium-241 (Am), and various uranium (U) isotopes, as well as several types of chlorinated solvents. The historic operations resulted in legacy contamination, including contaminated facilities, process waste lines, buried wastes and surface soil contamination. Decontamination and removal of buildings at the site was completed in late 2005, culminating more than ten years of active environmental remediation work. The Corrective Action Decision/Record of Decision was subsequently approved in 2006, signifying regulatory approval and closure of the site. The use of RFETS as a National Wildlife Refuge is scheduled to be in full operation by 2012. To develop a plan for remediating different types of radionuclide contaminants present in the RFETS environment required understanding the different environmental transport pathways for the various actinides. Developing this understanding was the primary objective of the Actinide Migration Evaluation (AME) project. Findings from the AME studies were used in the development of RFETS remediation strategies. The AME project focused on issues of actinide behavior and mobility in surface water, groundwater, air, soil and biota at RFETS. For the purposes of the AME studies, actinide elements addressed included Pu, Am, and U. The AME program, funded by DOE, brought together personnel with a broad range of relevant expertise in technical investigations. The AME advisory panel identified research investigations and approaches that could be used to solve issues related to actinide migration at the Site. An initial step of the AME was to develop a conceptual model to provide a qualitative description of the relationships among potential actinide sources and transport pathways at RFETS. One conceptual model was developed specifically for plutonium and americium, because of their similar geochemical and transport properties. A separate model was developed for uranium because of its different properties and mobility in the environment. These conceptual models were guidelines for quantitative analyses described in the RFETS Pathway Analysis Report, which used existing data from the literature as well as site-specific analyses, including field, laboratory and modeling studies to provide quantitative estimates of actinide migration in the RFETS environment. For pathways where more than one method was used to estimate offsite loads for a specific pathway, the method yielding the highest estimated off-site was used for comparison purposes. For all actinides studied, for pre-remediation conditions, air and surface water were identified to be the dominant transport mechanisms. The estimated annual airborne plutonium-239/240 load transported off site exceeded the surface water load by roughly a factor of 40. However, despite being the largest transport pathway, airborne radionuclide concentrations at the monitoring location with the highest measurements during the period studied were less than two percent of the allowable 10 milli-rem standard governing DOE facilities. Estimated actinide loads for other pathways were much less. Shallow groundwater was approximately two orders of magnitude lower, or 1/100 of the load conveyed in surface water. The estimated biological pathway load for plutonium was approximately five orders of magnitude less, or 1/100,000, of the load estimated for surface-water. The pathway analysis results were taken into consideration during subsequent remediation activities that occurred at the site. For example, when the 903 Pad area was remediated to address elevated concentrations of Pu and Am in the surface soil, portable tent structures were constructed to prevent wind and water erosion from occurring while remediation activitie

  3. Comparison of {sup 241}Am, {sup 239,240}Pu, and {sup 137}Cs concentrations in soil around Rocky Flats

    SciTech Connect (OSTI)

    Hulse, S.E.; Ibrahim, S.A.; Whicker, F.W.; Chapman, P.L.

    1999-03-01

    Gamma spectroscopy measurements were used to estimate concentrations of {sup 241}Am and {sup 137}Cs in soil profiles to depths of 21 cm at on-site and off-site locations around the Rocky Flats Environmental Technology Site and at regional background locations east of the Front Range between Colorado`s borders with New Mexico and Wyoming. Concentrations of these radionuclides were compared with concentrations of {sup 239,240}Pu in the same samples. Concentrations of {sup 241}Am in soil from depths of 0 to 3 cm decreased in an easterly direction from more than 5.3 kBq kg{sup {minus}1} 5 to 7 km away at a rate that was nearly proportional to the inverse square of distance. Deposits of {sup 137}Cs were ubiquitous, averaging 0.12 kBq kg{sup {minus}1} in soil from depths of 0 to 3 cm, but were unevenly distributed around Rocky Flats and the regional background locations. Deviations from the uniform exponential rate at which soil concentrations of {sup 137}Cs typically decreased with depth, {minus}0.25 cm{sup {minus}1} at undisturbed sites, enabled the authors to determine that about 10% of their sampling sites had been disturbed by erosion, tillage, or other factors. The mean rate at which {sup 239,240}Pu decreased with depth was about the same, {minus}0.23 cm{sup {minus}1}, throughout the study area. Soil concentrations of {sup 241}Am decreased with depth at a similar mean rate of {minus}0.22 cm{sup {minus}1} at locations close to the 903 pad where measurements were robust. Ratios between {sup 241}Am or {sup 239,240}Pu and {sup 137}Cs proved more useful for delineating the extent and pattern of contamination from Rocky Flats than did activity concentrations in soil.

  4. Evaluating, Migrating, and Consolidating Databases and Applications for Long-Term Surveillance and Maintenance Activities at the Rocky Flats Site

    SciTech Connect (OSTI)

    Surovchak, S.; Marutzky, S.; Thompson, B.; Miller, K.; Labonte, E.

    2006-07-01

    The U.S. Department of Energy (DOE) Office of Legacy Management (LM) is assuming responsibilities for long-term surveillance and maintenance (LTS and M) activities at the Rocky Flats Environmental Technology Site (RFETS) during fiscal year 2006. During the transition, LM is consolidating databases and applications that support these various functions into a few applications which will streamline future management and retrieval of data. This paper discussed the process of evaluating, migrating, and consolidating these databases and applications for LTS and M activities and provides lessons learned that will benefit future transitions. (authors)

  5. Demonstration, testing and evaluation of nonintrusive characterization technologies at operable Unit 2 of Rocky Flats Plant. Final report

    SciTech Connect (OSTI)

    1994-09-01

    A three-dimensional (3-D), high-resolution (HR) seismic reflection evaluation was conducted at the Rocky Flats Plant (RFP), near Golden, Colorado, to demonstrate the applicability of nonintrusive characterization techniques to detect buried objects, contamination, and geological/hydrological features at RFP. The evaluation was conducted as part of the U.S. Department of Energy`s (DOE) request for demonstration, testing and evaluation (DT&E) of nonintrusive techniques, under DOE Program Research and Development Announcement (PRDA) No. DE-RA05-09OR22000.

  6. A rational approach for evaluation and screening of treatment and disposal options for the solar pond sludges at Rocky Flats

    SciTech Connect (OSTI)

    Dickerson, K.S.

    1995-12-31

    This document consists of information about the treatment options for the sludge that is located in the evaporation ponds at the Rocky Flats Plant. The sludges are mixed low-level radioactive wastes whose composition and character were variable. Sludges similar to these are typically treated prior to ultimate disposal. Disposal of treated sludges includes both on-site and off-site options. The rational approach described in this paper is useful for technology evaluation and screening because it provides a format for developing objectives, listing alternatives, and weighing the alternatives against the objectives and against each other.

  7. The Department of Energy`s Rocky Flats Plant: A guide to record series useful for health-related research. Volume VII. Employee occupational exposure and health

    SciTech Connect (OSTI)

    1995-08-01

    This is the seventh in a series of seven volumes which constitute a guide to records of the Rocky Flats Plant useful for conducting health-related research. The primary purpose of Volume VII is to describe record series pertaining to employee occupational exposure and health at the Department of Energy`s (DOE) Rocky Flats Plant, now named the Rocky Flats Environmental Technology Site, near Denver, Colorado. History Associates Incorporated (HAI) prepared this guide as part of its work as the support services contractor for DOE`s Epidemiologic Records Inventory Project. This introduction briefly describes the Epidemiologic Records Inventory Project and HAI`s role in the project, provides a history of occupational exposure monitoring and health practices at Rocky Flats, and identifies organizations contributing to occupational exposure monitoring and health policies and activities. Other topics include the scope and arrangement of the guide and the organization to contact for access to these records. Comprehensive introductory and background information is available in Volume 1. Other volumes in the guide pertain to administrative and general subjects, facilities and equipment, production and materials handling, environmental and workplace monitoring, and waste management. In addition, HAI has produced a subject-specific guide, titled The September 1957 Rocky Flats Fire: A Guide to Record Series of the Department of Energy and Its Contractors, which researchers should consult for further information about records related to this incident.

  8. The Department of Energy`s Rocky Flats Plant: A guide to record series useful for health-related research. Volume VI, workplace and environmental monitoring

    SciTech Connect (OSTI)

    1995-08-01

    This is the sixth in a series of seven volumes which constitute a guide to records of the Rocky Flats Plant useful for conducting health-related research. The primary purpose of Volume VI is to describe record series pertaining to workplace and environmental monitoring activities at the Department of Energy`s (DOE) Rocky Flats Plant, now named the Rocky Flats Environmental Technology Site, near Denver, Colorado. History Associates Incorporated (HAI) prepared this guide as part of its work as the support services contractor for DOE`s Epidemiologic Records Inventory Project. This introduction briefly describes the Epidemiologic Records Inventory Project and HAI`s role in the project, provides a history of workplace and environmental monitoring practices at Rocky Flats, and identifies organizations contributing to workplace and environmental monitoring policies and activities. Other topics include the scope and arrangement of this volume and the organization to contact for access to these records. Comprehensive introductory and background information is available in Volume I. Other volumes in the guide pertain to administrative and general subjects, facilities and equipment, production and materials handling, waste management, and employee health. In addition, HAI has produced a subject-specific guide, titled The September 1957 Rocky Flats Fire. A Guide to Record Series of the Department of Energy and Its Contractors, which researchers should consult for further information about records related to this incident.

  9. The Department of Energy`s Rocky Flats Plant: A guide to record series useful for health-related research. Volume III, facilities and equipment

    SciTech Connect (OSTI)

    1995-08-01

    This is the third in a series of seven volumes which constitute a guide to records of the Rocky Flats Plant useful for conducting health-related research. The primary purpose of Volume M is to describe record series pertaining to facilities and equipment at the Department of Energy`s (DOE) Rocky Flats Plant, now named the Rocky Flats Environmental Technology Site, near Denver, Colorado. History Associates Incorporated (HAI) prepared this guide as part of its work as the support services contractor for DOE`s Epidemiologic Records Inventory Project. This introduction briefly describes the Epidemiologic Records Inventory Project and HAI`s role in the project, provides a history of facilities and equipment practices at Rocky Flats, and identifies organizations contributing to facilities and equipment policies and activities. Other topics include the scope and arrangement of this volume and the organization to contact for access to these records. Comprehensive introductory and background information is available in Volume I. Other volumes in the guide pertain to administrative and general subjects, production and materials handling, workplace and environmental monitoring, employee health, and waste management. In addition, HAI has produced a subject-specific guide, titled The September 1957 Rocky Flats Fire: A Guide to Record Series of the Department of Energy and Its Contractors, which researchers should consult for further information about records related to this incident.

  10. Sorbent Testing for the Solidification of Unidentified Rocky Flats Laboratory Waste Stored at the Idaho National Laboratory

    SciTech Connect (OSTI)

    Bickford, J.; Kimmitt, R.

    2007-07-01

    At the request of the U.S. Department of Energy (DOE), MSE Technology Applications, Inc. (MSE) evaluated various commercially available sorbents to solidify unidentified laboratory liquids from Rocky Flats that are stored at the Idaho National Laboratory (INL). The liquids are a collection of laboratory wastes that were generated from various experiments and routine analytical laboratory activities carried out at Rocky Flats. The liquids are in bottles discovered inside of buried waste drums being exhumed from the subsurface disposal area at the Radioactive Waste Management Complex (RWMC) by the contractor, CH2M Hill Washington International (CWI). Free liquids are unacceptable at the Waste Isolation Pilot Plant (WIPP), and some of these liquids cannot be returned to the retrieval pit. Stabilization of the liquids into a solid mass will allow these materials to be sent to an appropriate disposal location. The selected sorbent or sorbent combinations should produce a stabilized mass that is capable of withstanding conditions similar to those experienced during storage, shipping, and burial. The final wasteform should release less than 1% liquid by volume per the WIPP Waste Acceptance Criteria (WAC). The absence or presence of free liquid in the solidified waste-forms was detected when tested by SW-846, Method 9095B, Paint Filter Free Liquids, and the amount of liquid released from the wasteform was determined by SW-846, Method 9096, Liquid Release Test. Reactivity testing was also conducted on the solidified laboratory liquids. (authors)

  11. Implementation of Revision 19 of the TRUPACT-II Safety Analysis Report at Rocky Flats Environmental Technology Site

    SciTech Connect (OSTI)

    D'Amico, E.; O'Leary, J.; Bell, S.; Djordjevic, S.; Givens, C,; Shokes, T.; Thompson, S.; Stahl, S.

    2003-02-25

    The U.S. Nuclear Regulatory Commission on July 27, 2001 approved Revision 19 of the TRUPACT-II Safety Analysis Report (SAR) and the associated TRUPACT-II Authorized Methods for Payload Control (TRAMPAC). Key initiatives in Revision 19 included matrix depletion, unlimited mixing of shipping categories, a flammability assessment methodology, and an alternative methodology for the determination of flammable gas generation rates. All U.S. Department of Energy (DOE) sites shipping transuranic (TRU) waste to the Waste Isolation Pilot Plant (WIPP) were required to implement Revision 19 methodology into their characterization and waste transportation programs by May 20, 2002. An implementation process was demonstrated by the Rocky Flats Environmental Technology Site (RFETS) in Golden, Colorado. The three-part process used by RFETS included revision of the site-specific TRAMPAC, an evaluation of the contact-handled TRU waste inventory against the regulations in Revision 19, and design and development of software to facilitate future inventory analyses.

  12. A decision analysis method for selection of waste minimization process options for TRU mixed material at Rocky Flats

    SciTech Connect (OSTI)

    Williams, R.E.; Dustin, D.F.

    1994-02-01

    When plutonium production operations were halted at the Rocky Flats Plant, there remained a volume of material that was retained in order that its plutonium content could be reclaimed. This material, known as residue, is transuranic and mixed transuranic material with a plutonium content above what was called the ``economic discard limit,`` or EDL. The EDL was defined in terms of each type of residue material, and each type of material is given an Item Description Code, or IDC. Residue IDCs have been grouped into general category descriptions which include plutonium (Pu) nitrate solutions, Pu chloride solutions, salts, ash, metal, filters, combustibles, graphite, crucibles, glass, resins, gloves, firebrick, and sludges. Similar material exists both below and above the EDL, with material with the (previous) economic potential for reclamation of plutonium classified as residue.

  13. In situ remediation of plutonium from glovebox exhaust ducts at the Department of Energy`s Rocky Flats Plant

    SciTech Connect (OSTI)

    Dugdale, J.S.; Humiston, T.J.; Omer, G.E.

    1993-10-01

    Plutonium and other miscellaneous hold-up materials have been accumulating in the glovebox exhaust ducts at the Rocky Flats Plant over the 40 years of weapons production at the site. The Duct Remediation Project was undertaken to assess the safety impacts of this material, and to remove it from the ductwork. The project necessitated the development of specialized tools, equipment and methods to remediate the material from continuously operating ventilation systems. Special engineered access locations were also required to provide access to the ductwork, and to ensure that safety and system operability were not degraded as a result of the remediation efforts. Operations personnel underwent significant training and development, and became an important asset to the success of the project. In total, the project succeeded in removing over 40 kilograms of plutonium-bearing material from one of the major weapons production buildings at the plant.

  14. Systematic Evaluation Program (SEP) at Rocky Flats Plant: An overview of practical management issues for evaluation of natural phenomena hazards

    SciTech Connect (OSTI)

    Badwan, F.M.; Herring, K.S.

    1993-08-01

    Many of the buildings at the Rocky Flats Plant were designed and built before modern standards were developed, including standards for protection against extreme natural phenomenon such as tornadoes, earthquakes, and floods. The purpose of the SEP is to establish an integrated approach to assessing the design adequacy of specific high and moderate hazard Rocky Flats facilities from a safety perspective and to establish a basis for defining any needed facility improvements. The SEP is to be carried out in three Phases. In Phase 1, topics to be evaluated and an evaluation plan for each topic were developed. Any differences between Current Design Requirements (CDR) or acceptance criteria and the design of existing facilities, will be identified during Phase 2 and assessed using an integrated systematic approach during Phase 3. The integrated assessment performed during Phase 3 provides a process for evaluating the differences between existing facility design and CDRs so that decisions on corrective actions can be made on the basis of relative risk reduction and cost effectiveness. These efforts will ensure that a balanced and integrated level of safety is achieved for long-term operation of these buildings. Through appropriate selection of topics and identification of the structures, systems, and components to be evaluated, the SEP will address outstanding design issues related to the prevention and mitigation of design basis accidents, including those arising from natural phenomena. The objective of the SEP is not to bring these buildings into strict compliance with current requirements, but rather to ensure that an adequate level of safety is achieved in an economical fashion.

  15. Cost Estimating for Decommissioning of a Plutonium Facility--Lessons Learned From The Rocky Flats Building 771 Project

    SciTech Connect (OSTI)

    Stevens, J. L.; Titus, R.; Sanford, P. C.

    2002-02-26

    The Rocky Flats Closure Site is implementing an aggressive approach in an attempt to complete Site closure by 2006. The replanning effort to meet this goal required that the life-cycle decommissioning effort for the Site and for the major individual facilities be reexamined in detail. As part of the overall effort, the cost estimate for the Building 771 decommissioning project was revised to incorporate both actual cost data from a recently-completed similar project and detailed planning for all activities. This paper provides a brief overview of the replanning process and the original estimate, and then discusses the modifications to that estimate to reflect new data, methods, and planning rigor. It provides the new work breakdown structure and discusses the reasons for the final arrangement chosen. It follows with the process used to assign scope, cost, and schedule elements within the new structure, and development of the new code of accounts. Finally, it describes the project control methodology used to track the project, and provides lessons learned on cost tracking in the decommissioning environment.

  16. Rocky Flats CAAS System Recalibrated, Retested, and Analyzed to Install in the Criticality Experiments Facility at the Nevada Test Site

    SciTech Connect (OSTI)

    Kim, S; Heinrichs, D; Biswas, D; Huang, S; Dulik, G; Scorby, J; Boussoufi, M; Liu, B; Wilson, R

    2009-05-27

    Neutron detectors and control panels transferred from the Rocky Flats Plant (RFP) were recalibrated and retested for redeployment to the CEF. Testing and calibration were successful with no failure to any equipment. Detector sensitivity was tested at a TRIGA reactor, and the response to thermal neutron flux was satisfactory. MCNP calculated minimum fission yield ({approx} 2 x 10{sup 15} fissions) was applied to determine the thermal flux at selected detector positions at the CEF. Thermal flux levels were greater than 6.39 x 10{sup 6} (n/cm{sup 2}-sec), which was about four orders of magnitude greater than the minimum alarm flux. Calculations of detector survivable distances indicate that, to be out of lethal area, a detector needs to be placed greater than 15 ft away from a maximum credible source. MCNP calculated flux/dose results were independently verified by COG. CAAS calibration and the testing confirmed that the RFP CAAS system is performing its functions as expected. New criteria for the CAAS detector placement and 12-rad zone boundaries at the CEF are established. All of the CAAS related documents and hardware have been transferred from LLNL to NSTec for installation at the CEF high bay areas.

  17. Radcalc for windows benchmark study: A comparison of software results with Rocky Flats hydrogen gas generation data

    SciTech Connect (OSTI)

    MCFADDEN, J.G.

    1999-07-19

    Radcalc for Windows Version 2.01 is a user-friendly software program developed by Waste Management Federal Services, Inc., Northwest Operations for the U.S. Department of Energy (McFadden et al. 1998). It is used for transportation and packaging applications in the shipment of radioactive waste materials. Among its applications are the classification of waste per the US. Department of Transportation regulations, the calculation of decay heat and daughter products, and the calculation of the radiolytic production of hydrogen gas. The Radcalc program has been extensively tested and validated (Green et al. 1995, McFadden et al. 1998) by comparison of each Radcalc algorithm to hand calculations. An opportunity to benchmark Radcalc hydrogen gas generation calculations to experimental data arose when the Rocky Flats Environmental Technology Site (RFETS) Residue Stabilization Program collected hydrogen gas generation data to determine compliance with requirements for shipment of waste in the TRUPACT-II (Schierloh 1998). The residue/waste drums tested at RFETS contain contaminated, solid, inorganic materials in polyethylene bags. The contamination is predominantly due to plutonium and americium isotopes. The information provided by Schierloh (1 998) of RFETS includes decay heat, hydrogen gas generation rates, calculated G{sub eff} values, and waste material type, making the experimental data ideal for benchmarking Radcalc. The following sections discuss the RFETS data and the Radcalc cases modeled with the data. Results are tabulated and also provided graphically.

  18. Status and use of the Rocky Flats Environmental Technology Site Pipe Overpack Container for TRU waste storage and shipments

    SciTech Connect (OSTI)

    Thorp, D.T.; Geinitz, R.R.; Rivera, M.A.

    1998-03-03

    The Pipe Overpack Container was designed to optimize shipments of high plutonium content transuranic waste from Rocky Flats Environmental Technology Site (RFETS) to Waste Isolation Pilot Plant (WIPP). The container was approved for use in the TRUPACT-II shipping container by the Nuclear Regulatory Commission in February 1997. The container optimizes shipments to WIPP by increasing the TRUPACT-II criticality limit from 325 fissile grams equivalent (FGE) to 2,800 FGE and provides additional shielding for handling wastes with high americium-241 (Am-241) content. The container was subsequently evaluated and approved for storage of highly dispersible TRU wastes and residues at RFETS. Thermal evaluation of the container shows that the container will mitigate the impact of a worst case thermal event from reactive or potentially pyrophoric materials. These materials contain hazards postulated by the Defense Nuclear Facilities Safety Board for interim storage. Packaging these reactive or potentially pyrophoric residues in the container without stabilizing the materials is under consideration at RFETS. The design, testing, and evaluations used in the approvals, and the current status of the container usage, will be discussed.

  19. Solidification Tests Conducted on Transuranic Mixed Oil Waste (TRUM) at the Rocky Flats Environmental Technology Site (RFETS)

    SciTech Connect (OSTI)

    Brunkow, W. G.; Campbell, D.; Geimer, R.; Gilbreath, C.; Rivera, M.

    2002-02-25

    Rocky Flats Environmental Technology Site (RFETS) near Golden, Colorado is the first major nuclear weapons site within the DOE complex that has been declared a full closure site. RFETS has been given the challenge of closing the site by 2006. Key to meeting this challenge is the removal of all waste from the site followed by site restoration. Crucial to meeting this challenge is Kaiser-Hill's (RFETS Operating Contractor) ability to dispose of significant quantities of ''orphan'' wastes. Orphan wastes are those with no current disposition for treatment or disposal. Once such waste stream, generically referred to as Transuranic oils, poses a significant threat to meeting the closure schedule. Historically, this waste stream, which consist of a variety of oil contaminated with a range of organic solvents were treated by simply mixing with Environstone. This treatment method rendered a solidified waste form, but unfortunately not a TRUPACT-II transportable waste. So for the last ten years, RFETS has been accumulating these TRU oils while searching for a non-controversial treatment option.

  20. Analysis of the toxicity in Rocky Flats Plant surface water through a correlation between the whole effluent toxicity test and the Microtox assay

    SciTech Connect (OSTI)

    Ford, S.M.; Wolaver, H.A.; Figueroa, L.A.

    1992-07-01

    Results were correlated from the Microtox assay and the whole effluent acute toxicity test for effluents from the (1) wastewater treatment plant (WWTP) and (2) terminal ponds located at the Rocky Flats Plant. Literature reviews indicate that Photobacterium phosphoreum (Microtox assay) may be used as screening test for the reaction of Ceriodaphnia dubia and Pimephales promelas to toxins present in effluents. This study indicates that the Microtox is less sensitive to toxins present in the WWTP effluent than other test organisms (Ceriodaphnia dubia and Pimephales promelas). Toxicity appears to be from unionized ammonia. Ten months of data reveal that the surface water effluents which leave Rocky Flats boundaries are non-toxic when judged by all three test organisms.

  1. Analysis of the toxicity in Rocky Flats Plant surface water through a correlation between the whole effluent toxicity test and the Microtox assay

    SciTech Connect (OSTI)

    Ford, S.M.; Wolaver, H.A. ); Figueroa, L.A. )

    1992-01-01

    Results were correlated from the Microtox assay and the whole effluent acute toxicity test for effluents from the (1) wastewater treatment plant (WWTP) and (2) terminal ponds located at the Rocky Flats Plant. Literature reviews indicate that Photobacterium phosphoreum (Microtox assay) may be used as screening test for the reaction of Ceriodaphnia dubia and Pimephales promelas to toxins present in effluents. This study indicates that the Microtox is less sensitive to toxins present in the WWTP effluent than other test organisms (Ceriodaphnia dubia and Pimephales promelas). Toxicity appears to be from unionized ammonia. Ten months of data reveal that the surface water effluents which leave Rocky Flats boundaries are non-toxic when judged by all three test organisms.

  2. Evaluation of atmospheric transport models for use in Phase II of the historical public exposures studies at the Rocky Flats Plant

    SciTech Connect (OSTI)

    Rood, A.S.; Killough, G.G.; Till, J.E.

    1999-08-01

    Five atmospheric transport models were evaluated for use in Phase II of the Historical Public Exposures Studies at the Rocky Flats Plant. Models included a simple straight-line Gaussian plume model (ISCST2), several integrated puff models (RATCHET, TRIAD, and INPUFF2), and a complex terrain model (TRAC). Evaluations were based on how well model predictions compared with sulfur hexafluoride tracer measurements taken in the vicinity of Rocky Flats in February 1991. Twelve separate tracer experiments were conducted, each lasting 9 hr and measured at 140 samplers in arcs 8 and 16 km from the release point at Rocky Flats. Four modeling objectives were defined based on the endpoints of the overall study: (1) the unpaired maximum hourly average concentration, (2) paired time-averaged concentration, (3) unpaired time-averaged concentration, and (4) arc-integrated concentration. Performance measures were used to evaluate models and focused on the geometric mean and standard deviation of the predicted-to-observed ratio and the correlation coefficient between predicted and observed concentrations. No one model consistently outperformed the others in all modeling objectives and performance measures. The overall performance of the RATCHET model was somewhat better than the other models.

  3. X-ray absorption fine structure spectroscopic determination of plutonium speciation at the Rocky Flats environmental technology

    SciTech Connect (OSTI)

    Lezama-pacheco, Juan S; Conradson, Steven D; Clark, David L

    2008-01-01

    X-ray Absorption Fine Structure spectroscopy was used to probe the speciation of the ppm level Pu in thirteen soil and concrete samples from the Rocky Flats Environmental Technology Site in support of the site remediation effort that has been successfully completed since these measurements. In addition to X-ray Absorption Near Edge Spectra, two of the samples yielded Extended X-ray Absorption Fine Structure spectra that could be analyzed by curve-fits. Most of these spectra exhibited features consistent with PU(IV), and more specificaJly, PuO{sub 2+x}-type speciation. Two were ambiguous, possibly indicating that Pu that was originally present in a different form was transforming into PuO{sub 2+x}, and one was interpreted as demonstrating the presence of an unusual Pu(VI) compound, consistent with its source being spills from a PUREX purification line onto a concrete floor and the resultant extreme conditions. These experimental results therefore validated models that predicted that insoluble PuO{sub 2+x} would be the most stable form of Pu in equilibrium with air and water even when the source terms were most likely Pu metal with organic compounds or a Pu fire. A corollary of these models' predictions and other in situ observations is therefore that the minimal transport of Pu that occurred on the site was via the resuspension and mobilization of colloidal particles. Under these conditions, the small amounts of diffusely distributed Pu that were left on the site after its remediation pose only a negligible hazard.

  4. Accelerating cleanup: Paths to closure

    SciTech Connect (OSTI)

    1998-06-01

    This report describes the status of Environmental Management`s (EM`s) cleanup program and a direction forward to complete achievement of the 2006 vision. Achieving the 2006 vision results in significant benefits related to accomplishing EM program objectives. As DOE sites accelerate cleanup activities, risks to public health, the environment, and worker safety and health are all reduced. Finding more efficient ways to conduct work can result in making compliance with applicable environmental requirements easier to achieve. Finally, as cleanup activities at sites are completed, the EM program can focus attention and resources on the small number of sites with more complex cleanup challenges. Chapter 1 describes the process by which this report has been developed and what it hopes to accomplish, its relationship to the EM decision-making process, and a general background of the EM mission and program. Chapter 2 describes how the site-by-site projections were constructed, and summarizes, for each of DOE`s 11 Operations/Field Offices, the projected costs and schedules for completing the cleanup mission. Chapter 3 presents summaries of the detailed cleanup projections from three of the 11 Operations/Field Offices: Rocky Flats (Colorado), Richland (Washington), and Savannah River (South Carolina). The remaining eight Operations/Field Office summaries are in Appendix E. Chapter 4 reviews the cost drivers, budgetary constraints, and performance enhancements underlying the detailed analysis of the 353 projects that comprise EM`s accelerated cleanup and closure effort. Chapter 5 describes a management system to support the EM program. Chapter 6 provides responses to the general comments received on the February draft of this document.

  5. A Study of the Stability and Characterization Plutonium Dioxide and Chemical Characterization [of] Rocky Flats and Los Alamos Plutonium-Containing Incinerator Ash

    SciTech Connect (OSTI)

    Ray, A.K.; Boettger, J.C.; Behrens, Robert G.

    1999-11-29

    In the presentation ''A Study of the Stability and Characterization of Plutonium Dioxide'', the authors discuss their recent work on actinide stabilities and characterization, in particular, plutonium dioxide PuO{sub 2}. Earlier studies have indicated that PuO{sub 2} has the fluorite structure of CaF{sub 2} and typical oxide semiconductor properties. However, detailed results on the bulk electronic structure of this important actinide oxide have not been available. The authors have used all-electron, full potential linear combinations Gaussian type orbitals fitting function (LCGTO-FF) method to study PuO{sub 2}. The LCGTO-FF technique characterized by its use of three independent GTO basis sets to expand the orbitals, charge density, and exchange-correlation integral kernels. Results will be presented on zero pressure using both the Hedin-Lundquist local density approximation (LDA) model or the Perdew-Wang generalized gradient approximation (GGA) model. Possibilities of different characterizations of PuO{sub 2} will be explored. The paper ''Chemical Characterization Rocky Flats and Los Alamos Plutonium-Containing Incinerator Ash'' describes the results of a comprehensive study of the chemical characteristics of virgin, calcined and fluorinated incinerator ash produced at the Rocky Flats Plant and at the Los Alamos National Laboratory prior to 1988. The Rocky Flats and Los Alamos virgin, calcined, and fluorinated ashes were also dissolved using standard nitrate dissolution chemistry. Corresponding chemical evaluations were preformed on the resultant ash heel and the results compared with those of the virgin ash. Fluorination studies using FT spectroscopy as a diagnostic tool were also performed to evaluate the chemistry of phosphorus, sulfur, carbon, and silicon containing species in the ash. The distribution of plutonium and other chemical elements with the virgin ash, ash heel, fluorinated ash, and fluorinated ash heel particulates were studied in detail using microprobe analysis. Some of the more interesting results of these investigations are presented.

  6. HOW THE ROCKY FLATS ENVIRONMENTAL TECHNOLOGY SITE DEVELOPED A NEW WASTE PACKAGE USING A POLYUREA COATING THAT IS SAFELY AND ECONOMICALLY ELIMINATING SIZE REDUCTION OF LARGE ITEMS

    SciTech Connect (OSTI)

    Dorr, Kent A.; Hogue, Richard S.; Kimokeo, Margaret K.

    2003-02-27

    One of the major challenges involved in closing the Rocky Flats Environmental Technology Site (RFETS) is the disposal of extremely large pieces of contaminated production equipment and building debris. Past practice has been to size reduce the equipment into pieces small enough to fit into approved, standard waste containers. Size reducing this equipment is extremely expensive, and exposes workers to high-risk tasks, including significant industrial, chemical, and radiological hazards. RFETS has developed a waste package using a Polyurea coating for shipping large contaminated objects. The cost and schedule savings have been significant.

  7. Integrating Volume Reduction and Packaging Alternatives to Achieve Cost Savings for Low Level Waste Disposal at the Rocky Flats Environmental Technology Site

    SciTech Connect (OSTI)

    Church, A.; Gordon, J.; Montrose, J. K.

    2002-02-26

    In order to reduce costs and achieve schedules for Closure of the Rocky Flats Environmental Technology Site (RFETS), the Waste Requirements Group has implemented a number of cost saving initiatives aimed at integrating waste volume reduction with the selection of compliant waste packaging methods for the disposal of RFETS low level radioactive waste (LLW). Waste Guidance Inventory and Shipping Forecasts indicate that over 200,000 m3 of low level waste will be shipped offsite between FY2002 and FY2006. Current projections indicate that the majority of this waste will be shipped offsite in an estimated 40,000 55-gallon drums, 10,000 metal and plywood boxes, and 5000 cargo containers. Currently, the projected cost for packaging, shipment, and disposal adds up to $80 million. With these waste volume and cost projections, the need for more efficient and cost effective packaging and transportation options were apparent in order to reduce costs and achieve future Site packaging a nd transportation needs. This paper presents some of the cost saving initiatives being implemented for waste packaging at the Rocky Flats Environmental Technology Site (the Site). There are many options for either volume reduction or alternative packaging. Each building and/or project may indicate different preferences and/or combinations of options.

  8. Observation and Responses to Post-Closure Instances of Localized Instability and Subsidence at the DOE Legacy Management Rocky Flats Site, Colorado-13052

    SciTech Connect (OSTI)

    DiSalvo, Rick; Darr, Bob; Boylan, John; Surovchak, Scott

    2013-07-01

    The former Rocky Flats Plant in Colorado began operations as part of the nation's nuclear weapons complex in the early 1950's. By the 1980's the associated heavily industrialized area covered approximately 1.2 km{sup 2} (300 acres) and was surrounded by an approximately 25.3 km{sup 2} (6,245 acre) security buffer zone. The federally owned property and adjacent offsite areas were placed on the CERCLA National Priority List in 1989. To complete closure, all buildings and other structures that composed the Rocky Flats industrial complex were removed from the surface, but remnants remain in the subsurface. Contouring and grading to return the surface to approximate conditions that were present prior to the plant's construction was completed in 2005. A goal of the final land configuration was to provide long-term surface and subsurface land stability. Several instances of localized surface subsidence or instability have occurred since the final configuration. The localized nature and the relatively small areas of observed subsidence and instability indicate that, overall, the final configuration is performing well, but responses to these occurrences and the observations that followed may be useful in planning for the closure and designing the final land configuration and post-closure monitoring at other sites. (authors)

  9. The Department of Energy`s Rocky Flats Plant: A guide to record series useful for health-related research. Volume I, introduction

    SciTech Connect (OSTI)

    1995-08-01

    This guide consists of seven volumes which describe records useful for conducting health-related research at the DOE`s Rocky Flats Plant. Volume I is an introduction, and the remaining six volumes are arranged by the following categories: administrative and general, facilities and equipment, production and materials handling, waste management, workplace and environmental monitoring, and employee occupational exposure and health. Volume I briefly describes the Epidemiologic Records Project and provides information on the methodology used to inventory and describe the records series contained in subsequent volumes. Volume II describes records concerning administrative functions and general information. Volume III describes records series relating to the construction and routine maintenance of plant buildings and the purchase and installation of equipment. Volume IV describes records pertaining to the inventory and production of nuclear materials and weapon components. Records series include materials inventories, manufacturing specifications, engineering orders, transfer and shipment records, and War Reserve Bomb Books. Volume V describes records series pertaining to the storage, handling, treatment, and disposal of radioactive, chemical, or mixed materials produced or used at Rocky Flats. Volume VI describes records series pertaining to monitoring of the workplace and of the environment outside of buildings onsite and offsite. Volume VII describes records series pertaining to the health and occupational exposures of employees and visitors.

  10. Analysis of offsite Emergency Planning Zones (EPZs) for the Rocky Flats Plant. Phase 3, Sitewide spectrum-of-accidents and bounding EPZ analysis

    SciTech Connect (OSTI)

    Petrocchi, A.J.; Zimmerman, G.A.

    1994-03-14

    During Phase 3 of the EPZ project, a sitewide analysis will be performed applying a spectrum-of-accidents approach to both radiological and nonradiological hazardous materials release scenarios. This analysis will include the MCA but will be wider in scope and will produce options for the State of Colorado for establishing a bounding EPZ that is intended to more comprehensively update the interim, preliminary EPZ developed in Phase 2. EG&G will propose use of a hazards assessment methodology that is consistent with the DOE Emergency Management Guide for Hazards Assessments and other methods required by DOE orders. This will include hazards, accident, safety, and risk analyses. Using this methodology, EG&G will develop technical analyses for a spectrum of accidents. The analyses will show the potential effects from the spectrum of accidents on the offsite population together with identification of offsite vulnerable zones and areas of concern. These analyses will incorporate state-of-the-art technology for accident analysis, atmospheric plume dispersion modeling, consequence analysis, and the application of these evaluations to the general public population at risk. The analyses will treat both radiological and nonradiological hazardous materials and mixtures of both released accidentally to the atmosphere. DOE/RFO will submit these results to the State of Colorado for the State`s use in determining offsite emergency planning zones for the Rocky Flats Plant. In addition, the results will be used for internal Rocky Flats Plant emergency planning.

  11. Evaluation of beryllium exposure assessment and control programs at AWE, Cardiff Facility, Rocky Flats Plant, Oak Ridge Y-12 Plant and Lawrence Livermore National Laboratory. Phase 1

    SciTech Connect (OSTI)

    Johnson, J.S.; Foote, K.L.; Slawski, J.W.; Cogbill, G.

    1995-04-28

    Site visits were made to DOE beryllium handling facilities at the Rocky Flats Plant; Oak Ridge Y-12 Plant, LLNL; as well as to the AWE Cardiff Facility. Available historical data from each facility describing its beryllium control program were obtained and summarized in this report. The AWE Cardiff Facility computerized Be personal and area air-sampling database was obtained and a preliminary evaluation was conducted. Further validation and documentation of this database will be very useful in estimating worker Be. exposure as well as in identifying the source potential for a variety of Be fabrication activities. Although all of the Be control programs recognized the toxicity of Be and its compounds, their established control procedures differed significantly. The Cardiff Facility, which was designed for only Be work, implemented a very strict Be control program that has essentially remained unchanged, even to today. LLNL and the Oak Ridge Y-12 Plant also implemented a strict Be control program, but personal sampling was not used until the mid 1980s to evaluate worker exposure. The Rocky Flats plant implemented significantly less controls on beryllium processing than the three previous facilities. In addition, records were less available, management and industrial hygiene staff turned over regularly, and less control was evident from a management perspective.

  12. Department of Energy Awards $300,000 Block Grant to the Rocky...

    Broader source: Energy.gov (indexed) [DOE]

    Block Grant to the Rocky Flats Community Reuse Organization Department of Energy Awards 300,000 Block Grant to the Rocky Flats Community Reuse Organization More Documents &...

  13. Peer review panel summary report for technical determination of mixed waste incineration off-gas systems for Rocky Flats; Appendix A

    SciTech Connect (OSTI)

    1992-12-31

    A Peer Review Panel was convened on September 15-17, 1992 in Boulder, Co. The members of this panel included representatives from DOE, EPA, and DOE contractors along with invited experts in the fields of air pollution control and waste incineration. The primary purpose of this review panel was to make a technical determination of a hold, test and release off gas capture system should be implemented in the proposed RF Pland mixed waste incineration system; or if a state of the art continuous air pollution control and monitoring system should be utilized as the sole off-gas control system. All of the evaluations by the panel were based upon the use of the fluidized bed unit proposed by Rocky Flats and cannot be generalized to other systems.

  14. DOE - Office of Legacy Management -- Rocky Benefits

    Office of Legacy Management (LM)

    Colorado > Rocky Benefits Rocky Flats Site, Colorado Benefits Administration Rocky Flats Benefits Administration Rocky Flats Benefits Center P.O Box 9735 Providence, RI 02940 Phone - (866) 296-5036 Fax - (888) 501-9768 Medical and Life Insurance Administration Pension Administration General Benefits Questions Death Reporting Address Changes Benefits Issue Resolutions Leanna Nighswonger (509) 373-1419 Leanna_c_Nighswonger@rl.gov Last Updated: 11/20/2014

  15. A research study to determine the effect of Total Quality Management (TQM) on employee morale in Plant Procedures Division at EG&G, Rocky Flats, Inc.

    SciTech Connect (OSTI)

    Casey, E.F.

    1994-01-01

    EG&G at Rocky Flats, Golden, Colorado, experienced a high amount of low morale, due to the plant site having been designated to close, and the uneasiness of the working force was very visible. Some employees accepted early retirement in October 1992, however, all received letters of 120 days notice in March 1993, and were advised several cuts Would be made by October 1, 1993. This information alone caused many insecurities in employees, and caused morale to decrease even more. This is an in depth study of morale, which was upgraded in Plant Procedures Group (PPG), through the effect of TQM. The primary research included a survey of employees with results included. The study also increased additional questions in PPG, some of which were added to the agenda of the Process Improvement Team (PIT) to improve PPG in the eyes of customers. Statistics did show that morale improved, not necessarily because of TQM or the progress of the Process Improvement Team (PIT), but due to efforts of the staff implementing the principles of TQM the best they knew how.

  16. An assessment and evaluation for recycle/reuse of contaminated process and metallurgical equipment at the DOE Rocky Flats Plant Site -- Building 865. Final report

    SciTech Connect (OSTI)

    Not Available

    1993-08-01

    An economic analysis of the potential advantages of alternatives for recycling and reusing equipment now stored in Building 865 at the Rocky Flats Plant (RFP) in Colorado has been conducted. The inventory considered in this analysis consists primarily of metallurgical and process equipment used before January 1992, during development and production of nuclear weapons components at the site. The economic analysis consists of a thorough building inventory and cost comparisons for four equipment dispositions alternatives. The first is a baseline option of disposal at a Low Level Waste (LLW) landfill. The three alternatives investigated are metal recycling, reuse with the government sector, and release for unrestricted use. This report provides item-by-item estimates of value, disposal cost, and decontamination cost. The economic evaluation methods documented here, the simple cost comparisons presented, and the data provided as a supplement, should provide a foundation for D&D decisions for Building 865, as well as for similar D&D tasks at RFP and at other sites.

  17. Particulate, colloidal, and solution phase associations of plutonium, americium, and uranium in surface and groundwater at the Rocky Flats Plant, Colorado

    SciTech Connect (OSTI)

    Harnish, R.A.; McKnight, D.M.; Ranville, J.F.; Stephens, V.C.; Honeyman, B.D.

    1993-12-31

    With the cessation of plutonium processing at the D.O.E.-administered Rocky Flats Plant near Denver, CO, the focus of activities at the facility has switched to contaminant assessment and potential remediation strategies. In this context the authors began a study in 1991 to determine the potential for colloid-facilitated transport of the actinides Pu, Am, and in surface- and groundwater at this site. Using the technique of tangential flow ultrafiltration, the authors isolated particles from four size fractions at one groundwater well and two surface water seeps to determine the distribution of Pu, Am, and U among particulate, colloidal, and dissolved aqueous phases. Analysis of particle isolates and filtrate fractions showed significant associations of Am and Pu with colloidal and particulate size particles; uranium isotopes were associated mainly with low molecular weight organic species. The results indicate a potential for colloidal-facilitated transport of the actinides Pu and Am and a significant contribution by low molecular weight natural organic matter to uranium transport.

  18. DOE - Office of Legacy Management -- Rocky

    Office of Legacy Management (LM)

    Rocky Flats Site, Colorado A CERCLA and/or RCRA Site RockyFlats2014 Remediation at the Rocky Flats Site was conducted in accordance with Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and/or Resource Conservation and Recovery Act (RCRA) regulations. Responsibility for operation and maintenance of the site was transferred to LM in October 2005 and requires operation and maintenance of remedial action systems, routine inspection and maintenance, records-related

  19. DOE - Office of Legacy Management -- Rocky

    Office of Legacy Management (LM)

    Rocky Flats Site, Colorado Key Documents and Links Fact Sheet pdf_icon Quarterly Report of Site Surveillance and Maintenance Activities Third Quarter Calendar Year 2015 pdf_icon Quarterly Report of Site Surveillance and Maintenance Activities Third Quarter Calendar Year 2015 Presentation pdf_icon Annual Report of Site Surveillance and Maintenance Activities at the Rocky Flats, Colorado, Site Calendar Year 2014 pdf_icon Overview of the Rocky Flats Evaluation of Water Quality Variability: April

  20. Environmental Cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Cleanup Tour Environmental Cleanup See how LANL is cleaning up the environmental legacy of the Manhattan Project and Cold War

  1. Environmental Cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Cleanup Tour Environmental Cleanup See how LANL is cleaning up the environmental legacy of the Manhattan Project and Cold War Open full screen to view more You are...

  2. Cleanup 101

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cleanup 101 Cleanup 101 The Compliance Order on Consent agreement with State of New Mexico dictates cleanup on an appropriate schedule. August 1, 2013 Workers sort through waste for processing at TA-21 Workers sort through waste for processing at TA-21 Historical operations discontinued in the Los Alamos townsite in the 1950s. 2,123 potential release sites (PRS) were investigated for possible cleanup. Sites ranged in size and severity from suspected quarts of oil to a 63-acre material disposal

  3. Idaho Site Completes Cleanup with Help from Workers who Shipped Waste Decades Ago

    Office of Environmental Management (EM)

    October 6, 2011 Idaho Site Completes Cleanup with Help from Workers who Shipped Waste Decades Ago IDAHO FALLS, Idaho - From the 1950s until the 1980s, workers at the former Rocky Flats Plant near Denver, Colo., sent hundreds of thousands of barrels and boxes of radioactive and hazardous waste to the Idaho National Laboratory (INL) for disposal both above and below ground. Now, some of those who sent the Cold War weapons waste to Idaho are helping identify the waste in pits dug up for the first

  4. Preliminary Notice of Violation, Rocky Mountain Remediation Services- EA-97-04

    Broader source: Energy.gov [DOE]

    Preliminary Notice of Violation issued to Rocky Mountain Remediation Services related to a Radioactive Material Release during Trench Remediation at the Rocky Flats Environmental Technology Site, (EA-97-04)

  5. Environmental Cleanup Stories

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cleanup Feature Stories community-environmentassetsimagesicon-environment.jpg Environmental Cleanup Stories Our environmental stewardship commitment: clean up the past,...

  6. REVEGETATION OF THE ROCKY FLATS SITE, COLORADO

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    growing on the topsoil, this could have been avoided by not using topsoil from that location. However, because no evaluation was done, a stand of undesirable nonnative grasses...

  7. Rocky Flats resumes shipments to WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5:07 p.m. (Mountain Standard Time). The truck, carrying two TRUPACT-II (Transuranic Packaging Transporter Model II) shipping containers, departed RFETS, near Golden, Colo.,...

  8. Immobilization of Rocky Flats Graphite Fines Residue

    SciTech Connect (OSTI)

    Rudisill, T.S.

    1999-04-06

    The development of the immobilization process for graphite fines has proceeded through a series of experimental programs. The experimental procedures and results from each series of experiments are discussed in this report.

  9. Preliminary Notice of Violation, Rocky Mountain Remediation Services...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    related to a Radioactive Material Release during Trench Remediation at the Rocky Flats Environmental Technology Site, (EA-97-04) On June 6, 1997, the U.S. Department of Energy...

  10. Legacy Cleanup Completion Project

    Broader source: Energy.gov [DOE]

    Presentation from the 2015 DOE National Cleanup Workshop by Christine Gelles, Associate Deputy Assistant Secretary, Waste Management EM HQ.

  11. Rockies Area | Open Energy Information

    Open Energy Info (EERE)

    Rockies Area Jump to: navigation, search Contents 1 Clean Energy Clusters in the Rockies Area 1.1 Products and Services in the Rockies Area 1.2 Research and Development...

  12. Environmental Cleanup and Remediation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cleanup /environment/_assets/images/icon_earthday.jpg Environmental Cleanup: Cleaning the Past Our goal is to clean up legacy waste sites and contaminated areas to protect human health and the environment, now and for years to come. WIPP Accident Investigation Board Report» Feature Stories» What We Clean Up & Why» TOP STORIES - highlights of our science, people, technologies close Environmental Remediation program completes legacy mercury cleanup near Smith's Marketplace To reduce its

  13. DOE National Cleanup Workshops

    Broader source: Energy.gov [DOE]

    DOE, in cooperation with the Energy Communities Alliance and the Energy Facility Contractors Group, held the first DOE National Cleanup Workshop Sept. 29 and 30, 2015, in the Washington, D.C. area. The workshop brought together senior DOE executives, officials from DOE sites, industry executives, and other stakeholders to discuss EMs progress in the cleanup of the environmental legacy of the nations Manhattan Project and Cold War nuclear weapons program. The workshop focused on major cleanup successes planned for the next two years, contract and project management improvement, efforts to develop new cleanup technologies, and more.

  14. National Cleanup Workshops

    Broader source: Energy.gov [DOE]

    The Energy Communities Alliance (ECA), in cooperation with the Department of Energy (DOE) and the Energy Facility Contractors Group (EFCOG), held the first National Cleanup Workshop Sept. 29 and 30, 2015, in the Washington, D.C. area. The workshop brought together senior DOE executives, officials from DOE sites, industry executives, and other stakeholders to discuss EM’s progress in the cleanup of the environmental legacy of the nation’s Manhattan Project and Cold War nuclear weapons program. The workshop focused on major cleanup successes planned for the next two years, contract and project management improvement, efforts to develop new cleanup technologies, and more.

  15. Idaho Site Completes Cleanup with Help from Workers who Shipped Waste Decades Ago

    Broader source: Energy.gov [DOE]

    From the 1950s until the 1980s, workers at the former Rocky Flats Plant near Denver, Colo., sent hundreds of thousands of barrels and boxes of radioactive and hazardous waste to the Idaho National...

  16. Cleanup Progress Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    News » Cleanup Progress Reports Cleanup Progress Reports Documents Available for Download January 1, 2015 Cleanup Progress Report - 2014 Oak Ridge's cleanup accomplishments during 2014 January 1, 2014 Cleanup Progress Report - 2013 Oak Ridge's cleanup accomplishments in 2013. January 1, 2013 Cleanup Progress Report - 2012 Oak Ridge's cleanup accomplishments during 2012. January 2, 2012 Cleanup Progress Report - 2011 Oak Ridge's cleanup accomplishments during 2011. January 3, 2011 Cleanup

  17. Rocky Mountain Institute | Open Energy Information

    Open Energy Info (EERE)

    Rocky Mountain Institute Jump to: navigation, search Logo: Rocky Mountain Institute Name: Rocky Mountain Institute Address: 1820 Folsom Street Place: Boulder, Colorado Zip: 80302...

  18. WIPP - CBFO Accelerating Cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    more information, access DOE Environmental Management site at: http://www.em.doe.gov/closure/ For more information regarding the Accelerating Cleanup: Paths to Closure, contact Freida Huckeba at (505) 234-7315. Accelerating Cleanup: Paths to Closure (PtC) This document has been provided to you in PDF format. Please install Adobe Acrobat Reader before accessing these documents. For your convenience, each section of this document contains a Table of Contents complete with internal links. Just

  19. 2014 Cleanup Progress

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    96 Annual Report to the Oak Ridge Regional Community 2014 Cleanup Progress 2 1 Message from the EM Manager Department of Energy Oak Ridge Office To the Oak Ridge Regional Community: Reflecting on 2014, I am extremely proud of the Department of Energy (DOE) Oak Ridge Office's accomplishments. We completed the Department of Energy's larg- est-ever demolition project, transferred unneeded land to the community to bolster economic development opportunities, and progressed on cleanup projects at the

  20. Environmental Cleanup Stories

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Stories /environment/_assets/images/icon-environment.jpg Environmental Cleanup Stories Our environmental stewardship commitment: clean up the past, minimize environmental impacts, and create a sustainable future. A telescoping crane hoists a spider excavator over Los Alamos Canyon before placing it on the canyon slope to excavate historically contaminated soil. Environmental Remediation program completes legacy mercury cleanup near Smith's Marketplace Los Alamos National Laboratory performed a

  1. Cleanup Fact Sheets | Department of Energy

    Energy Savers [EERE]

    Services » Site Cleanup » Cleanup Fact Sheets Cleanup Fact Sheets Fact Sheets Available for Download East Tennessee Technology Park Cleanup Y-12 National Security Complex Cleanup Oak Ridge National Laboratory Cleanup OREM Accomplishments Timeline Environmental Laws and Regulations Site Cleanup Risk Removal Modernization Reindustrialization Waste Management Program Management Community Engagement

  2. Idaho Cleanup Project Congressional Nuclear Cleanup Caucus

    Energy Savers [EERE]

    Cleanup Program April 30, 2014 Thomas J. Dieter, CH2M-WG Idaho Danny Nichols, Idaho Treatment Group 2 www.energy.gov/EM The Idaho Site Background * 890 Square Miles * Remote location in the southeast region of Idaho * Established in 1949 as the Naval Gunnery Range * Currently referred to as the Idaho National Laboratory * Provided an isolated location where 52 first-of-a-kind test reactors could be designed, built and tested with one still in operation (Advanced Test Reactor) * EM's Idaho

  3. Reactor water cleanup system

    DOE Patents [OSTI]

    Gluntz, D.M.; Taft, W.E.

    1994-12-20

    A reactor water cleanup system includes a reactor pressure vessel containing a reactor core submerged in reactor water. First and second parallel cleanup trains are provided for extracting portions of the reactor water from the pressure vessel, cleaning the extracted water, and returning the cleaned water to the pressure vessel. Each of the cleanup trains includes a heat exchanger for cooling the reactor water, and a cleaner for cleaning the cooled reactor water. A return line is disposed between the cleaner and the pressure vessel for channeling the cleaned water thereto in a first mode of operation. A portion of the cooled water is bypassed around the cleaner during a second mode of operation and returned through the pressure vessel for shutdown cooling. 1 figure.

  4. Reactor water cleanup system

    DOE Patents [OSTI]

    Gluntz, Douglas M.; Taft, William E.

    1994-01-01

    A reactor water cleanup system includes a reactor pressure vessel containing a reactor core submerged in reactor water. First and second parallel cleanup trains are provided for extracting portions of the reactor water from the pressure vessel, cleaning the extracted water, and returning the cleaned water to the pressure vessel. Each of the cleanup trains includes a heat exchanger for cooling the reactor water, and a cleaner for cleaning the cooled reactor water. A return line is disposed between the cleaner and the pressure vessel for channeling the cleaned water thereto in a first mode of operation. A portion of the cooled water is bypassed around the cleaner during a second mode of operation and returned through the pressure vessel for shutdown cooling.

  5. Cleanup Sites | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cleanup Sites Cleanup Sites Center Map As the largest environmental cleanup program in the world, EM has been charged with the responsibility of cleaning up 107 sites across the country whose area is equal to the combined area of Rhode Island and Delaware. To date, EM has made substantial progress in nearly every area of nuclear waste cleanup and completed cleanup at 91 of these sites. The "active" sites continue to have ongoing cleanup projects under EM's purview. Use the interactive

  6. 2016 National Cleanup Workshop

    Broader source: Energy.gov [DOE]

    The Energy Communities Alliance (ECA) will be holding the 2016 National Cleanup Workshop Sept. 14-15, 2016, at the Hilton Alexandria Mark Center in Alexandria, Va. Cooperating organizations for the event include the Department of Energy (DOE) and the Energy Facility Contractors Group (EFCOG).

  7. Clean Economy Network-Rockies | Open Energy Information

    Open Energy Info (EERE)

    Economy Network-Rockies Jump to: navigation, search Name: Clean Economy Network-Rockies Place: Denver, CO Region: Rockies Area Website: rockies.cleaneconomynetwork.or Coordinates:...

  8. About Hanford Cleanup - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Us About Hanford Cleanup About Us About Hanford Cleanup Regulators, Boards, Councils Hanford History Hanford Site Wide Programs Contact Us About Hanford Cleanup Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size Hanford Cleanup For more than forty years, reactors located at Hanford produced plutonium for America's defense program. The process of making plutonium is extremely "inefficient" in that a massive amount of liquid and solid waste is generated while

  9. Cleanup Sites | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sites Cleanup Sites The 33,500-acre Oak Ridge Reservation, outlined in red, contains three primary cleanup areas-- the East Tennessee Technology Park, Oak Ridge National Laboratory, and Y-12 National Security Complex. The 33,500-acre Oak Ridge Reservation, outlined in red, contains three primary cleanup areas-- the East Tennessee Technology Park, Oak Ridge National Laboratory, and Y-12 National Security Complex. Oak Ridge has three primary cleanup sites within the Oak Ridge Reservation-the Oak

  10. Environmental Cleanup | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Cleanup Environmental Cleanup Learn more about the history, cleanup activities and possible future uses of the Hanford Site, a 586-square-mile government site in southeast Washington State. | Video courtesy of the Energy Department. The Energy Department is committed to a safe, complete cleanup of the environmental legacy of five decades of government-sponsored nuclear weapons development and nuclear energy research. As part of this mission, we safely and cost-effectively transport

  11. Site Cleanup | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cleanup Site Cleanup A view of Building K-25 cleanup at the East Tenneseee Technology Park. A view of Building K-25 cleanup at the East Tenneseee Technology Park. Unlike many EM cleanup sites, Oak Ridge has numerous ongoing missions aside from EM. The success and rate of progress often depends on the amount of work the organization achieves at the site. At the East Tennessee Technology Park, EM is tasked with removing facilities associated with 40 years of uranium enrichment and production to

  12. Chromium Groundwater Cleanup

    Broader source: Energy.gov (indexed) [DOE]

    Los Alamos National Laboratory | UNCLASSIFIED | 1 Chromium Groundwater Cleanup in Mortandad Canyon for the Northern New Mexico Citizens' Advisory Board Los Alamos National Laboratory September 24, 2014 Operated by Los Alamos Security, LLC for the U.S. Department of Energy's NNSA LA-UR-14-27280 | Los Alamos National Laboratory | UNCLASSIFIED | 2 Presentation Overview § History, location and background - refresher § Nature and extent of Cr plume § Overall remediation strategy §

  13. WIPP Accelerating Cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ACCELERATING CLEANUP: PATHS TO CLOSURE CARLSBAD AREA OFFICE JUNE 1998 I. Operations/Field Overview CAO Mission The mission of the Carlsbad Area Office (CAO) is to protect human health and the environment by opening and operating the Waste Isolation Pilot Plant (WIPP) for safe disposal of transuranic (TRU) waste and by establishing an effective system for management of TRU waste from generation to disposal. It includes personnel assigned to CAO, WIPP site operations, transportation, and other

  14. Rocky Flats Environmental Technology Site Idle Equipment, August 21, 1997

    Office of Environmental Management (EM)

  15. DOE's Former Rocky Flats Weapons Production Site to Become National...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (DOI) U.S. Fish and Wildlife Service (FWS) for use as a National Wildlife Refuge. ... "With the transfer of nearly 4,000 acres from the Department of Energy, the U.S. Fish and ...

  16. Rocky Flats Overview Aurora History Museum October 16, 2013

    Office of Environmental Management (EM)

    5 Nuclear Weapons Complex Nuclear Weapons Production Processes Step Process Major Sites 1 Uranium Mining, Milling, and Refining Uranium Mill Tailing Remedial Action Project sites,...

  17. Rocky Flats Environmental Technology Site Mixed Residue Consent...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9-09-24-01 State Colorado Agreement Type Consent Order Legal Driver(s) RCRA Scope Summary Substitute this Consent Order for the MR Consent Order; establish requirements for mixed...

  18. Rocky Flats Environmental Technology Site Treatment Plan Compliance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    an Agreement addressing compliance with the Hazardous and Solid Waste Amendments of 1984 to RCRA. ESTABLISHING MILESTONES * The Site Treatment Plan provides for a three-year...

  19. Rocky Mountain Humane Investing | Open Energy Information

    Open Energy Info (EERE)

    Rocky Mountain Humane Investing Jump to: navigation, search Name: Rocky Mountain Humane Investing Place: Allenspark, Colorado Zip: 80510 Product: Allenspark-based investment...

  20. he Hanford Story Tank Waste Cleanup | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    he Hanford Story Tank Waste Cleanup he Hanford Story Tank Waste Cleanup Addthis Description The Hanford Story Tank Waste Cleanup

  1. 2015 DOE National Cleanup Workshop

    Broader source: Energy.gov [DOE]

    DOE, in cooperation with the Energy Communities Alliance and the Energy Facility Contractors Group, held the first DOE National Cleanup Workshop on Sept. 29 and 30, 2015 in the Washington, D.C. area. The workshop brought together senior DOE executives, officials from DOE sites, industry executives, and other stakeholders to discuss EM’s progress in the cleanup of the environmental legacy of the nation’s Manhattan Project and Cold War nuclear weapons program. The workshop focused on major cleanup successes planned for the next two years, contract and project management improvement, efforts to develop new cleanup technologies, and more.

  2. SHEPHERDS FLAT | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SHEPHERDS FLAT SHEPHERDS FLAT SHEPHERDS FLAT SHEPHERDS FLAT SHEPHERDS FLAT SHEPHERDS FLAT SHEPHERDS FLAT SHEPHERDS FLAT SHEPHERDS FLAT SHEPHERDS FLAT SHEPHERDS FLAT SHEPHERDS FLAT SHEPHERDS FLAT SHEPHERDS FLAT SHEPHERDS FLAT PROJECT SUMMARY In December 2010, the Department of Energy issued a $1.3 billion partial loan guarantee under the Financial Institution Partnership Program (FIPP) to finance Shepherds Flat, an 845-MW wind power generation project located in eastern Oregon. It reached full

  3. Rocky Mountain Power- Net Metering

    Broader source: Energy.gov [DOE]

    For residential and small commercial customers, net excess generation (NEG) is credited at Rocky Mountain Power's retail rate and carried forward to the next month. For larger commercial and...

  4. Cummins Rocky Mount Engine Plant

    Broader source: Energy.gov [DOE]

    This presentation by Cummins, Inc. at the 2015 World Energy Engineering Congress shares the Rocky Mount Engine Plant’s experience with achieving certification to Superior Energy Performance® (SEP™)...

  5. Nuclear radiation cleanup and uranium prospecting (Patent) |...

    Office of Scientific and Technical Information (OSTI)

    Nuclear radiation cleanup and uranium prospecting Citation Details In-Document Search Title: Nuclear radiation cleanup and uranium prospecting Apparatus, systems, and methods for...

  6. Nuclear radiation cleanup and uranium prospecting (Patent) |...

    Office of Scientific and Technical Information (OSTI)

    Nuclear radiation cleanup and uranium prospecting Citation Details In-Document Search Title: Nuclear radiation cleanup and uranium prospecting You are accessing a document from...

  7. Independent Oversight Activity Report, Idaho Cleanup Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Idaho Cleanup Project - November 2013 Independent Oversight Activity Report, Idaho Cleanup Project - November 2013 November 2013 Pre-restart Visit to the Integrated Waste Treatment...

  8. New Contract Helps Portsmouth GDP Cleanup

    Broader source: Energy.gov [DOE]

    To accelerate the Portsmouth GDP cleanup efforts left over from the Cold War, the Department of Energy made a huge step forward in our nuclear environmental cleanup efforts.

  9. Environmental Remediation program completes legacy mercury cleanup...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Stories Legacy slope-side cleanup Environmental Remediation program completes legacy mercury cleanup near Smith's Marketplace Los Alamos National Laboratory performed a ...

  10. Terminating Safeguards on Excess Special Nuclear Material: Defense TRU Waste Clean-up and Nonproliferation - 12426

    SciTech Connect (OSTI)

    Hayes, Timothy; Nelson, Roger

    2012-07-01

    The Department of Energy (DOE) and the National Nuclear Security Administration (NNSA) manages defense nuclear material that has been determined to be excess to programmatic needs and declared waste. When these wastes contain plutonium, they almost always meet the definition of defense transuranic (TRU) waste and are thus eligible for disposal at the Waste Isolation Pilot Plant (WIPP). The DOE operates the WIPP in a manner that physical protections for attractiveness level D or higher special nuclear material (SNM) are not the normal operating condition. Therefore, there is currently a requirement to terminate safeguards before disposal of these wastes at the WIPP. Presented are the processes used to terminate safeguards, lessons learned during the termination process, and how these approaches might be useful for future defense TRU waste needing safeguards termination prior to shipment and disposal at the WIPP. Also described is a new criticality control container, which will increase the amount of fissile material that can be loaded per container, and how it will save significant taxpayer dollars. Retrieval, compliant packaging and shipment of retrievably stored legacy TRU waste has dominated disposal operations at WIPP since it began operations 12 years ago. But because most of this legacy waste has successfully been emplaced in WIPP, the TRU waste clean-up focus is turning to newly-generated TRU materials. A major component will be transuranic SNM, currently managed in safeguards-protected vaults around the weapons complex. As DOE and NNSA continue to consolidate and shrink the weapons complex footprint, it is expected that significant quantities of transuranic SNM will be declared surplus to the nation's needs. Safeguards termination of SNM varies due to the wide range of attractiveness level of the potential material that may be directly discarded as waste. To enhance the efficiency of shipping waste with high TRU fissile content to WIPP, DOE designed an over-pack container, similar to the pipe component, called the criticality control over-pack, which will significantly enhance the efficiency of disposal. Hundreds of shipments of transuranic SNM, suitably packaged to meet WIPP waste acceptance criteria and with safeguards terminated have been successfully emplaced at WIPP (primarily from the Rocky Flats site clean-up) since WIPP opened. DOE expects that thousands more may eventually result from SNM consolidation efforts throughout the weapons complex. (authors)

  11. Environmental Management (EM) Cleanup Projects

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-09-24

    The guide supports DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, and provides guidance on environmental management cleanup projects. Canceled by DOE N 251.105.

  12. Upper Los Alamos Canyon Cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Upper Los Alamos Canyon Cleanup Upper Los Alamos Canyon Cleanup The Upper Los Alamos Canyon Project involves cleaning up hazardous materials left over from some of the Laboratory's earliest activities. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Located along Los Alamos Canyon from 7th Street to the Pajarito Ski Hill, the Upper Los Alamos Canyon Project involves examining sites in present and former Laboratory

  13. Paducah Cleanup Milestones | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cleanup Milestones Paducah Cleanup Milestones The Paducah Site Management Plan sets forth enforceable milestones for cleanup activities. These activities include a series of prioritized cleanup actions, ongoing analysis to support future cleanup decisions, and eventual D&D of the gaseous diffusion plant. FY 2015 - Key Milestones/Outlook Issue Federal Facility Agreement Annual Site Management Plan (D1) Issue Burial Grounds Solid Waste Management Unit 5 and 6 Record of Decision (D1) C-400 -

  14. Central Plateau Inner Area Cleanup Principles

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Inner Area Cleanup Principles * Cleanup Principles are the initial conditions and approaches to developing cleanup decisions in the Inner Area * These Principles will guide the development of the Remedial Investigations and Feasibility Studies (RI/FS) * These Principles will help DOE produce RI/FS documents to better meet regulator expectations * Formal agreement on cleanup, as influenced by these Principles, does not happen until the Record of Decision What are Cleanup Principles? 2 * The Inner

  15. Flat | Open Energy Information

    Open Energy Info (EERE)

    ENERGYGeothermal Home Print PDF Flat Dictionary.png Flat: A relatively smooth landscape with no topographic relief Other definitions:Wikipedia Reegle Topographic Features...

  16. Radiological cleanup of Enewetak Atoll

    SciTech Connect (OSTI)

    Not Available

    1981-01-01

    For 8 years, from 1972 until 1980, the United States planned and carried out the radiological cleanup, rehabilitation, and resettlement of Enewetak Atoll in the Marshall Islands. This documentary records, from the perspective of DOD, the background, decisions, actions, and results of this major national and international effort. The documentary is designed: First, to provide a historical document which records with accuracy this major event in the history of Enewetak Atoll, the Marshall Islands, the Trust Territory of the Pacific Islands, Micronesia, the Pacific Basin, and the United States. Second, to provide a definitive record of the radiological contamination of the Atoll. Third, to provide a detailed record of the radiological exposure of the cleanup forces themselves. Fourth, to provide a useful guide for subsequent radiological cleanup efforts elsewhere.

  17. Voluntary Protection Program Onsite Review, Idaho Cleanup Project...

    Energy Savers [EERE]

    Idaho Cleanup Project- June 2007 Voluntary Protection Program Onsite Review, Idaho Cleanup Project- June 2007 June 2007 Evaluation to determine whether the Idaho Cleanup Project is...

  18. Stimulus Funding Will Accelerate Cleanup In Idaho

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CLEANUP PROJECT ARRA FACT SHEET 1119 Kb Energy Secretary Chu Announces 6 Billion in Recovery Act Funding for Environmental Cleanup 88 Kb Editorial Date March 31, 2008 By Bradley...

  19. Oak Ridge Cleanup Areas | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Management » Environmental Stewardship » Oak Ridge Cleanup Areas Oak Ridge Cleanup Areas Employees conduct soil and water samples to determine which areas require cleanup. Employees conduct soil and water samples to determine which areas require cleanup. On November 21, 1989, the Environmental Protection Agency placed the Department of Energy's Oak Ridge site on its National Prioritization List (NPL). The list names national priorities where there are known or threatened releases of

  20. 2016 National Cleanup Workshop | Department of Energy

    Energy Savers [EERE]

    2016 National Cleanup Workshop 2016 National Cleanup Workshop 2016 National Cleanup Workshop The Energy Communities Alliance (ECA) will be holding the 2016 National Cleanup Workshop Sept. 14-15, 2016, at the Hilton Alexandria Mark Center in Alexandria, Va. Cooperating organizations for the event include the Department of Energy (DOE) and the Energy Facility Contractors Group (EFCOG). The workshop will bring together senior DOE executives, officials from DOE sites, industry executives, and other

  1. Washington Closure Hanford: Cleanup Progress Along Hanford's...

    Broader source: Energy.gov (indexed) [DOE]

    Sax, President, Washington Closure Hanford. Washington Closure Hanford: Cleanup Progress Along Hanford's River Corridor More Documents & Publications 2014 Congressional Nuclear...

  2. Paducah Cleanup Progress | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Progress Paducah Cleanup Progress Since 1990, DOE has invested $1.9 billion in successful Paducah site cleanup projects to protect human health and the environment. The Environmental Management (EM) cleanup mission will continue through GDP transition and decontamination and decommissioning. Significant Paducah Site Cleanup Progress since 1990: Paducah leanup Progress graphic Recent Progress A panoramic view of the east end of the C-410 complex shows a rainbow forming as sunlight passes through

  3. Mapco's NGL Rocky Mountain pipeline

    SciTech Connect (OSTI)

    Isaacs, S.F.

    1980-01-01

    The Rocky Mountain natural gas liquids (NGL) pipeline was born as a result of major producible gas finds in the Rocky Mountain area after gas deregulation. Gas discoveries in the overthurst area indicated considerable volumes of NGL would be available for transportation out of the area within the next 5 to 7 years. Mapco studied the need for a pipeline to the overthrust, but the volumes were not substantial at the time because there was little market and, consequently, little production for ethane. Since that time crude-based products for ethylene manufacture have become less competitive as a feed product on the world plastics market, and ethane demand has increased substantially. This change in the market has caused a major modification in the plans of the NGL producers and, consequently, the ethane content of the NGL stream for the overthrust area is expected to be 30% by volume at startup and is anticipated to be at 45% by 1985. These ethane volumes enhance the feasibility of the pipeline. The 1196-mile Rocky Mountain pipeline will be installed from the existing facility in W. Texas, near Seminole, to Rock Springs, Wyoming. A gathering system will connect the trunk line station to various plant locations. The pipeline development program calls for a capacity of 65,000 bpd by the end of 1981.

  4. Rocky Mountain Power- wattsmart Business Program

    Broader source: Energy.gov [DOE]

    Rocky Mountain Power provides incentives for its commercial and industrial customers in Idaho to retrofit existing facilities with more efficient equipment. Full details are available on the...

  5. Rocky Mountain Power- wattsmart Business Program

    Broader source: Energy.gov [DOE]

    Rocky Mountain Power's wattsmart Program includes incentives and technical assistance for lighting, HVAC and other equipment upgrades that increase energy efficiency in commercial and industrial...

  6. Southern Rockies Geothermal Region | Open Energy Information

    Open Energy Info (EERE)

    ENERGYGeothermal Home Southern Rockies Geothermal Region Details Areas (1) Power Plants (0) Projects (0) Techniques (0) Assessment of Moderate- and High-Temperature...

  7. Northern Rockies Geothermal Region | Open Energy Information

    Open Energy Info (EERE)

    ENERGYGeothermal Home Northern Rockies Geothermal Region Details Areas (0) Power Plants (0) Projects (0) Techniques (0) Map: Name Province is situated in northern Idaho...

  8. Rocky Ridge I | Open Energy Information

    Open Energy Info (EERE)

    TradeWind Energy Energy Purchaser Western Farmers Electric Cooperative Location Rocky OK Coordinates 35.055821, -98.838426 Show Map Loading map... "minzoom":false,"mappings...

  9. Rocky Mountain Power- wattsmart Business Program

    Broader source: Energy.gov [DOE]

    Rocky Mountain Power's wattsmart Business Program provides extensive incentives and for lighting, HVAC, food service, agricultural, and compressed air equipment. Full details are available on the...

  10. Rocky Mountain Power- wattsmart Residential Efficiency Program

    Broader source: Energy.gov [DOE]

    Rocky Mountain Power provides incentives for residential customers in Idaho to install energy efficient equipment in their homes. Full details are available on the program website.

  11. Rocky Mountain Power- wattsmart Residential Efficiency Program

    Broader source: Energy.gov [DOE]

    Rocky Mountain Power provides incentives for residential customers to increase the energy efficiency of homes through the Home Energy Savings Program. Full details are available on the program...

  12. DRAFT Central Plateau Cleanup Strategy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    J.D. Dowell: DOE-RL John Price: Ecology Dennis Faulk: EPA October 9, 2012 2 River Corridor * 100 Area interim actions extended to - Incorporate 154 additional waste sites - Address prior extensive deep excavation of hexavalent chromium contamination * 100 Area decision documents - Extend 100 B/C decision documents schedule to enable collection of additional groundwater data for cleanup decision - Delay 100-N document several months to avoid overlap of public comment 3 River Corridor * 100 Area -

  13. Diesel prices flat

    U.S. Energy Information Administration (EIA) Indexed Site

    Diesel prices flat The U.S. average retail price for on-highway diesel fuel saw no movement from last week. Prices remained flat at 3.89 a gallon on Monday, based on the weekly...

  14. Windy Flats | Open Energy Information

    Open Energy Info (EERE)

    Flats Jump to: navigation, search Name Windy Flats Facility Windy Flats Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Cannon Power Group...

  15. Sustainability Center of the Rockies | Open Energy Information

    Open Energy Info (EERE)

    Sustainability Center of the Rockies Jump to: navigation, search Name: Sustainability Center of the Rockies Address: Post Office Box 2020 Place: Carbondale, Colorado Zip: 81623...

  16. 2014 Congressional Nuclear Cleanup Caucus Briefings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Congressional Nuclear Cleanup Caucus Briefings 2014 Congressional Nuclear Cleanup Caucus Briefings The Congressional Nuclear Cleanup Caucus serves as a way to brief members of Congress and their staff on EM headquarters and site activities, including budget, safety and project progress. PDF icon FY15 Budget Overview for Cleanup Caucus PDF icon Idaho Cleanup Project PDF icon Advanced Mixed Waste Treatment Project PDF icon Richland Operations Office Cleanup Strategy, Scope PDF icon Idaho Cleanup

  17. 2014 Congressional Nuclear Cleanup Caucus Briefings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Congressional Nuclear Cleanup Caucus Briefings 2014 Congressional Nuclear Cleanup Caucus Briefings The Congressional Nuclear Cleanup Caucus serves as a way to brief members of Congress and their staff on EM headquarters and site activities, including budget, safety and project progress. PDF icon FY15 Budget Overview for Cleanup Caucus PDF icon Idaho Cleanup Project PDF icon Advanced Mixed Waste Treatment Project PDF icon Richland Operations Office Cleanup Strategy, Scope PDF icon Idaho Cleanup

  18. DOE National Cleanup Workshop | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Assistant Secretary Regalbuto Lays out Vision, Priorities to Advance Cleanup for EM Program Assistant Secretary Regalbuto Lays out Vision, Priorities to Advance Cleanup for EM Program DOE Assistant Secretary for Environmental Management Monica Regalbuto speaks to more than 350 people at the National Cleanup Workshop just outside Washington, D.C. Read more Panelists Update Workshop Participants on Waste Isolation Pilot Plant Recovery Panelists Update Workshop Participants on Waste Isolation

  19. Lab completes record year for environmental cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Record year for environmental cleanup Lab completes record year for environmental cleanup Personnel conducted more field investigations and cleanup campaigns than ever and completed a record number of Lab shipments to WIPP. December 16, 2010 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new

  20. DRAFT Central Plateau Cleanup Strategy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Doug Shoop: DOE-RL John Price: Ecology Dave Einan: EPA November 2, 2012 2 River Corridor * 100 Area interim actions extended to 3/31/17 - Incorporate 154 additional waste sites - Address prior extensive deep excavation of hexavalent chromium contamination * 100 Area decision documents - Extend 100 B/C decision documents schedule to 12/15/16 to enable collection of additional groundwater data for cleanup decision - Delay 100-N document to 6/30/13 to avoid too many documents out for public comment

  1. The ABCs of Hanford Cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ABC's of Hanford Cleanup A B C ARRA Budget Community Relations Plan Asbestos Branching Out Columbia River Workshops Baton Chromium Badgers

  2. Independent Oversight Assessment, Idaho Cleanup Project Sodium...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Waste Treatment Project - November 2012 November 2012 Assessment of Nuclear Safety Culture at the Idaho Cleanup Project Sodium Bearing Waste Treatment Project This report...

  3. Tank Farm Area Cleanup Decision-Making

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Area Cleanup Decision-Making Groundwater Vadose Zone Single Shell Tank System Closure (tanks, structures and pipelines) * Washington State Hazardous Waste Management Act (Resource...

  4. Hanford Site Cleanup Completion Framework - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plan Single-Shell Tank Evaluations Deep Vadose Zone 100-F RIFS Sitewide Probabilistic Seismic Hazard Analysis Environmental Hanford Site Cleanup Completion Framework Email Email...

  5. PIA - Rocky Mountain OTC GSS | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rocky Mountain OTC GSS PIA - Rocky Mountain OTC GSS PIA - Rocky Mountain OTC GSS PDF icon PIA - Rocky Mountain OTC GSS More Documents & Publications PIA - WEB Unclassified Business Operations General Support System Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory PIA - Bonneville Power Adminstration Ethics Helpline

  6. EM Tackles Cleanup at Tonopah Test Range | Department of Energy

    Office of Environmental Management (EM)

    EM Tackles Cleanup at Tonopah Test Range EM Tackles Cleanup at Tonopah Test Range September 30, 2014 - 12:00pm Addthis Field technicians survey a shaker used in past cleanup ...

  7. Executing Legacy Clean-up at LANL | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Executing Legacy Clean-up at LANL Executing Legacy Clean-up at LANL Topic: DOE presented on the proposed new campaign approach to clean-up at Los Alamos National Laboratory, and ...

  8. Rocky Mountain Power | Open Energy Information

    Open Energy Info (EERE)

    to: navigation, search Rocky Mountain Power is a subsidiary of PacifiCorp which delivers electricity to customers in Utah, Wyoming and Idaho; it is headquartered in Salt Lake...

  9. Rocky Mountain Power- wattsmart New Homes Program

    Broader source: Energy.gov [DOE]

    The Rocky Mountain Power ENERGY STAR New Homes program offers cash incentives to contractors who build energy-efficient homes. To qualify for this incentive, the new home must meet the Version 2.5...

  10. HANFORD SITE RIVER CORRIDOR CLEANUP

    SciTech Connect (OSTI)

    BAZZELL, K.D.

    2006-02-01

    In 2005, the US Department of Energy (DOE) launched the third generation of closure contracts, including the River Corridor Closure (RCC) Contract at Hanford. Over the past decade, significant progress has been made on cleaning up the river shore that bordes Hanford. However, the most important cleanup challenges lie ahead. In March 2005, DOE awarded the Hanford River Corridor Closure Contract to Washington Closure Hanford (WCH), a limited liability company owned by Washington Group International, Bechtel National and CH2M HILL. It is a single-purpose company whose goal is to safely and efficiently accelerate cleanup in the 544 km{sup 2} Hanford river corridor and reduce or eliminate future obligations to DOE for maintaining long-term stewardship over the site. The RCC Contract is a cost-plus-incentive-fee closure contract, which incentivizes the contractor to reduce cost and accelerate the schedule. At $1.9 billion and seven years, WCH has accelerated cleaning up Hanford's river corridor significantly compared to the $3.2 billion and 10 years originally estimated by the US Army Corps of Engineers. Predictable funding is one of the key features of the new contract, with funding set by contract at $183 million in fiscal year (FY) 2006 and peaking at $387 million in FY2012. Another feature of the contract allows for Washington Closure to perform up to 40% of the value of the contract and subcontract the balance. One of the major challenges in the next few years will be to identify and qualify sufficient subcontractors to meet the goal.

  11. Recovery Act Workers Complete Environmental Cleanup of Coal Ash...

    Office of Environmental Management (EM)

    Complete Environmental Cleanup of Coal Ash Basin Recovery Act Workers Complete Environmental Cleanup of Coal Ash Basin The Savannah River Site (SRS) recently cleaned up a 17-acre ...

  12. Site Transition Process upon Completion of the Cleanup Mission...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Site Transition Process upon Completion of the Cleanup Mission: Fact Sheet (September 2013) DOE's internal site transition process for Cleanup to long-term stewardship, ...

  13. Probing Fukushima with cosmic rays should speed cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Probing Fukushima with cosmic rays should speed cleanup Probing Fukushima with cosmic rays should speed cleanup The initiative could reduce the time required to clean up the ...

  14. Assessment of Nuclear Safety Culture at the Idaho Cleanup Project...

    Office of Environmental Management (EM)

    Assessment of Nuclear Safety Culture at the Idaho Cleanup Project Sodium Bearing Waste ... Independent Oversight Assessment of Nuclear Safety Culture at the Idaho Cleanup ...

  15. EM's Defense Waste Processing Facility Achieves Waste Cleanup...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Defense Waste Processing Facility Achieves Waste Cleanup Milestone EM's Defense Waste Processing Facility Achieves Waste Cleanup Milestone January 14, 2016 - 12:10pm Addthis The...

  16. 2015 DOE National Cleanup Workshop | Department of Energy

    Energy Savers [EERE]

    2015 DOE National Cleanup Workshop 2015 DOE National Cleanup Workshop Addthis 1 of 5 2 of 5 3 of 5 4 of 5 5 of 5

  17. Environmental Cleanup Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Cleanup Reports Environmental Cleanup Reports June 2, 2015 Audit Report: DOE/IG-0937 The Status of Cleanup at the Department of Energy's Paducah Site September 18, 2014 Audit Report: OAS-M-14-11 Follow-Up on the Management of the Plutonium Finishing Plant Project September 26, 2013 Audit Report: OAS-L-13-15 The Radioactive Liquid Waste Treatment Facility Replacement Project at Los Alamos National Laboratory August 8, 2013 Audit Report: OAS-M-13-03 Cost Transfers at the Department's

  18. SHEPHERDS FLAT | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SHEPHERDS FLAT SHEPHERDS FLAT PDF icon DOE-LPO_Project-Posters_WIND_Shepherds-Flat.pdf More Documents & Publications EIS-0183: Record of Decision EIS-0183: Record of Decision EIS-0419: Supplement Analysis

  19. Diesel prices flat nationally

    U.S. Energy Information Administration (EIA) Indexed Site

    Diesel prices flat nationally The U.S. average retail price for on-highway diesel fuel remained the same from a week ago at 3.98 a gallon on Monday, based on the weekly price...

  20. Hazardous waste cleanup: the preliminaries

    SciTech Connect (OSTI)

    Amos, K.

    1985-08-01

    This article describes the lengthiness and cost of the preliminary steps in a hazardous waste cleanup. The article describes the S-Area lawsuit, an area near Niagara Falls, New York which was an inactive chemical dump. Contaminated sludge was found at a nearby water treatment plant and was traced back to S-Area. In the past five years, S-Area negotiations have cost the U.S. Environmental Protection Agency two million dollars for advice on how work should proceed for the plant and the landfill. This lawsuit was one of the first in the U.S. against a chemical company for endangering the public through unsound waste disposal practices. Negotiation was selected instead of a trial for several reasons which are outlined. S-Area may serve as a model for other such settlements, as it provides for a flexible plan, open to consideration of alternate technologies that may be developed in the future. It contains a phased approach to both defining and evaluating existing problems, then suggesting remedies. It also requires monitoring for at least 35 years or until no danger remains.

  1. Biogas Impurities and Cleanup for Fuel Cells

    Broader source: Energy.gov (indexed) [DOE]

    Biogas Impurities and Cleanup for Fuel Cells Dennis Papadias and Shabbir Ahmed Argonne National Laboratory Presented at the Biogas and Fuel Cells Workshop Golden, CO June 11-13,...

  2. Environmental Cleanup Reports | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Audit of Moab Mill Tailings Cleanup Project April 9, 2010 Audit Report: OAS-RA-10-07 Management Alert on Environmental Management's Select Strategy for Disposition of Savannah...

  3. Site Transition Process Upon Cleanup Completion | Department of Energy

    Energy Savers [EERE]

    Process Upon Cleanup Completion Site Transition Process Upon Cleanup Completion Site Transition Process Upon Cleanup Completion PDF icon Site Transition Process Upon Cleanup Completion More Documents & Publications Recommendation 198: Establish a site transition process Recommendation 218: Develop a Fact Sheet on Site Transition at On-going Mission Sites EM SSAB Conference Calls - January 27, 2011

  4. Washington Closure Hanford: Cleanup Progress Along Hanford's River Corridor

    Broader source: Energy.gov (indexed) [DOE]

    | Department of Energy from the 2015 DOE National Cleanup Workshop by Scott Sax, President, Washington Closure Hanford. PDF icon Washington Closure Hanford: Cleanup Progress Along Hanford's River Corridor More Documents & Publications 2014 Congressional Nuclear Cleanup Caucus Briefings 2013 Congressional Nuclear Cleanup Caucus Briefings Voluntary Protection Program Onsite Review, River Corridor Closure Project - June 2012

  5. 2014 House Nuclear Cleanup Caucus Oak Ridge

    Office of Environmental Management (EM)

    August 16, 2014 Sue Cange Acting Manager Oak Ridge Office of Environmental Management Oak Ridge Site Specific Advisory Board Annual Planning Meeting www.energy.gov/EM 2 Complete the cleanup of the Oak Ridge Reservation to: * Protect the region's health and environment * Make clean land available for future use * Ensure Department of Energy's ongoing vital missions OREM Mission www.energy.gov/EM 3 Work is organized by Cleanup Portfolios: * East Tennessee Technology Park (ETTP) * Oak Ridge

  6. Cleanup Progress Report - 2011 | Department of Energy

    Energy Savers [EERE]

    1 Cleanup Progress Report - 2011 In this issue, learn about EM's accomplishments in 2011 across the Oak Ridge Reservation. There are many more stories contained within the issue, but here are some of the highlights from each site. East Tennessee Technology Park DOE Selects New Cleanup Contractor K-25 East Wing Demolition Begins K-33 Building Demolished Oak Ridge National Laboratory 2000 Complex Demolition Completed Bethel Valley Burial Ground Remediation Completed Bethel Valley Groundwater

  7. Lab completes first Recovery Act cleanup project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LANL Recovery Act cleanup Lab completes first Recovery Act cleanup project The $13 million project involved demolition of an 18,000-square-foot former nuclear fusion research facility. August 4, 2010 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Los Alamos National Laboratory sits

  8. Los Alamos National Laboratory names cleanup subcontractors

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cleanup subcontractors named Los Alamos National Laboratory names cleanup subcontractors The three companies are Los Alamos Technical Associates (LATA), Portage Inc., and ARSEC Environmental, LLC (ARSEC). August 14, 2009 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Los Alamos

  9. Paducah Cleanup Scope | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Scope Paducah Cleanup Scope This graphic illustrates the organization of the Media/Activity-Specific OUs and Primary Projects. Check marks indicate completed projects and gradient boxes indicate projects in progress. This graphic illustrates the organization of the Media/Activity-Specific OUs and Primary Projects. Check marks indicate completed projects and gradient boxes indicate projects in progress. The overall environmental cleanup strategy at Paducah is based on taking near-term actions to

  10. Portsmouth Cleanup Progress | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cleanup Progress Portsmouth Cleanup Progress Environmental impacts occurred at the Portsmouth Gaseous Diffusion Plant during operations from 1954-2001. Remediation efforts began well before the uranium enrichment operations ceased in 2001. In 1989 the U.S. Department of Energy established the Office of Environmental Management for the purpose of remediating facilities within the nation's nuclear weapons complex. Various remediation efforts have taken place at the Portsmouth Site since 1989, to

  11. Portsmouth Environmental Cleanup | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cleanup Portsmouth Environmental Cleanup As part of deactivation efforts, process gas equipment is being removed from gaseous diffusion plant buildings. As part of deactivation efforts, process gas equipment is being removed from gaseous diffusion plant buildings. Decades of uranium enrichment and support activities at Portsmouth required the use of a number of typical and special industrial chemicals and materials. Gaseous Diffusion Plant operations generated hazardous, radioactive, mixed (both

  12. Demolition, Groundwater Cleanup Highlight Paducah's 2013 Accomplishments

    Office of Environmental Management (EM)

    | Department of Energy Demolition, Groundwater Cleanup Highlight Paducah's 2013 Accomplishments Demolition, Groundwater Cleanup Highlight Paducah's 2013 Accomplishments December 24, 2013 - 12:00pm Addthis A high-reach shear removes debris from the tallest structure of the C-340 complex at Paducah. Watch a video of this work here. The 120-foot-high Metals Plant was the tallest building at the Paducah site and encompassed about 1.5 million cubic feet, the volume of a football field roughly

  13. Credibility and trust in federal facility cleanups

    SciTech Connect (OSTI)

    Raynes, D.B.

    1995-12-01

    The most important indicator of a well-managed site cleanup effort may no longer be funding or scientific expertise. While support for federal facility cleanup has included appropriations of more than $10 billion annually, these expenditures alone are unlikely to assure progress toward environmental remediation. {open_quotes}Trust{close_quotes} is now overwhelmingly mentioned as a prerequisite for progress with site cleanup in DOE`s weapons complex. In part, federal budget deficits are forcing participants to focus on factors that build consensus and lead to cost-effective cleanup actions. In some cases, the stakeholders at cleanup sites are making efforts to work cooperatively with federal agencies. A report by 40 representatives of federal agencies, tribal and state governments, associations, and others developed recommendations to create a {open_quotes}new era of trust and consensus-building that allows all parties to get on with the job of cleaning up federal facilities in a manner that reflects the priorities and concerns of all stakeholders.{close_quotes} Changes are underway affecting how federal agencies work with federal and state regulators reflecting this concept of shared responsibility for conducting cleanup. This paper addresses these changes and provides examples of the successes and failures underway.

  14. Cummins Rocky Mount Engine Plant | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technical Assistance » Superior Energy Performance » Cummins Rocky Mount Engine Plant Cummins Rocky Mount Engine Plant sep_logo_borderless.jpg This presentation by Cummins, Inc. at the 2015 World Energy Engineering Congress shares the Rocky Mount Engine Plant's experience with achieving certification to Superior Energy Performance® (SEP(tm)) and ISO 50001. PDF icon Cummins Rocky Mount Engine Plant (September 2015) More Documents & Publications SEP Case Study Webinar: Cummins Slides The

  15. DOE Completes Cleanup at New York, California Sites | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Completes Cleanup at New York, California Sites DOE Completes Cleanup at New York, California Sites July 1, 2011 - 12:00am Addthis WASHINGTON, D.C. - Last month, the U.S....

  16. Hanford Progresses in Burial Ground Cleanup

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. – EM’s Richland Operations Office (RL) and cleanup contractor Washington Closure Hanford (WCH) are making tremendous progress cleaning up Hanford’s 618-10 Burial Ground, one of the most hazardous burial grounds in the EM complex.

  17. Voluntary Protection Program Onsite Review, Idaho Cleanup Project- October 2010

    Broader source: Energy.gov [DOE]

    Evaluation to determine whether Idaho Cleanup Project is continuing to perform at a level deserving DOE-VPP Star recognition.

  18. Risk Informing Environmental Cleanup Priorities | Department of Energy

    Office of Environmental Management (EM)

    Informing Environmental Cleanup Priorities Risk Informing Environmental Cleanup Priorities Presentation from the 2015 Annual Performance and Risk Assessment (P&RA) Community of Practice (CoP) Technical Exchange Meeting held in Richland, Washington on December 15-16, 2015. PDF icon Risk Informing Environmental Cleanup Priorities More Documents & Publications 2014 Congressional Nuclear Cleanup Caucus Briefings OREM Hosts Community Workshop Status Updates on the Performance and Risk

  19. 2013 Congressional Nuclear Cleanup Caucus Briefings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Congressional Nuclear Cleanup Caucus Briefings 2013 Congressional Nuclear Cleanup Caucus Briefings The Congressional Nuclear Cleanup Caucus serves as a way to brief members of Congress and their staff on EM headquarters and site activities, including budget, safety and project progress. PDF icon 04/24/2013 - FY14 Budget Overview for Clean Up Caucus PDF icon 05/07/2013 - Office of River Protection PDF icon 05/16/2013 - Oak Ridge Congressional Nuclear Cleanup Caucus PDF icon 05/21/2013 -

  20. Richland Operations Office Completes Cleanup in Hanford's 300 Area North

    Office of Environmental Management (EM)

    Section | Department of Energy Richland Operations Office Completes Cleanup in Hanford's 300 Area North Section Richland Operations Office Completes Cleanup in Hanford's 300 Area North Section March 28, 2013 - 12:00pm Addthis An aerial view of Hanford’s 300 Area North Section following completion of cleanup. An aerial view of Hanford's 300 Area North Section following completion of cleanup. Workers demolish the 384 Building, known as the Power House and Heating Plant, in the north

  1. EM Releases Supporting Materials From DOE's First National Cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Workshop | Department of Energy Supporting Materials From DOE's First National Cleanup Workshop EM Releases Supporting Materials From DOE's First National Cleanup Workshop November 9, 2015 - 10:00am Addthis EM Releases Supporting Materials From DOE’s First National Cleanup Workshop WASHINGTON, D.C. - EM is making available support materials from the first-ever DOE National Cleanup Workshop. The materials include links to 15 videos that capture addresses by Energy Secretary Ernest Moniz

  2. ETTP Cleanup and Reindustrialization Finishing What We Started | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy ETTP Cleanup and Reindustrialization Finishing What We Started ETTP Cleanup and Reindustrialization Finishing What We Started Presentation from the 2015 DOE National Cleanup Workshop by Ken Rueter, President, URS-CH2M Oak Ridge (UCOR). PDF icon ETTP Cleanup and Reindustrialization Finishing What We Started More Documents & Publications OREM Hosts Community Workshop Charting the Course for Major EM Successes in 2016-2017 OREM hosts annual community budget workshop

  3. 2013 Congressional Nuclear Cleanup Caucus Briefings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Congressional Nuclear Cleanup Caucus Briefings 2013 Congressional Nuclear Cleanup Caucus Briefings The Congressional Nuclear Cleanup Caucus serves as a way to brief members of Congress and their staff on EM headquarters and site activities, including budget, safety and project progress. PDF icon 04/24/2013 - FY14 Budget Overview for Clean Up Caucus PDF icon 05/07/2013 - Office of River Protection PDF icon 05/16/2013 - Oak Ridge Congressional Nuclear Cleanup Caucus PDF icon 05/21/2013 -

  4. East Tennessee Technology Park Cleanup | Department of Energy

    Office of Environmental Management (EM)

    Cleanup East Tennessee Technology Park Cleanup This fact sheet provides an update on all of the current cleanup projects at the site, and it also lists the major projects that were completed at the East Tennessee Technology Park. Projects include: K-1070-A and B Burial Ground Depleted Uranium Hexafluoride Container Removal Scrap Removal Project Ponds Remediation Groundwater Treatability Study Buildings K-25, K-27, K-29, K-31, and K-33 PDF icon ETTP cleanup fact sheet More Documents &

  5. Rocky Flats Environmental Technology Site Mixed Residue Consent Order, September 24, 1999

    Office of Environmental Management (EM)

  6. Rocky Flats Environmental Technology Site Treatment Plan Compliance Order, October 3, 1995

    Office of Environmental Management (EM)

  7. Rocky Flats Environmental Technology Site Waste Compliance Order, August 21, 1997

    Office of Environmental Management (EM)

  8. Calculated phase diagrams of pyrochemical systems at the Rocky Flats Plant

    SciTech Connect (OSTI)

    Murray, A.M.

    1988-01-01

    The phase diagrams can help in understanding the process. The approach taken is calculated binary and ternary phase diagrams and optimized thermodynamic parameters. The salt extraction system uses the salts Cs/sub 2/PuCl/sub 6/ and CaCl/sub 2/. Al, Mg, and Ca are used in the salt scrub system. Phase sections are given together with recommendations. (DLC)

  9. Long-Term Surveillance and Maintenance at the Rocky Flats Site...

    Energy Savers [EERE]

    as a buffer zone surrounding the former industrial area, was transferred to the U.S. Fish and Wildlife Service in July 2007 for a national wildlife refuge. DOE's Office of...

  10. Rocky Flats Environmental Technology Site Idle Equipment, August 21, 1997 Summary

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Number: 97-08-21-01 State Colorado Agreement Type Consent Order Legal Driver(s) RCRA Scope Summary Establish compliance requirements and schedules for the implementation of 1) the Management Plan for Material Contained in Idle Equipment, 2) the 1997 Hazardous Waste Tank Management Plan Parties DOE; Kaiser-Hill Company, LLC; Colorado Department of Public Health and Environment (CDPHE) Date 8/21/1997 SCOPE * Establish compliance requirements and schedules for the implementation of 1) the

  11. Rocky Flats Environmental Technology Site Waste Compliance Order, August 21, 1997 Summary

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7-08-21-02 State Colorado Agreement Type Consent Order Legal Driver(s) RCRA Scope Summary Establish compliance requirements and schedules for the implementation of a "Waste Chemical Project Plan" Parties DOE; Kaiser-Hill Company, LLC; Colorado Department of Public Health and Environment Date 8/21/1997 SCOPE * Establish compliance requirements and schedules for the implementation of a "Waste Chemical Project Plan" (the "Waste Chemical Plan") at RFETS. * Resolve

  12. Fire hazard analysis of Rocky Flats Building 776/777 duct systems

    SciTech Connect (OSTI)

    DiNenno, P.J.; Scheffey, J.L.; Gewain, R.G.; Shanley, J.H. Jr.

    1988-12-01

    The objective of this analysis is to determine if ventilation ductwork in Building 776/777 will maintain their structural integrity during expected fire conditions as well as standard design fires typically used to ascertain fire resistance ratings. If the analysis shows that ductwork will not maintain structural integrity, the impact of this failure will be determined and analyzed, and alternative solutions recommended. Associated with this analysis is the development of a computer fire model which can be used as an engineering tool in analyzing the effect of fires on ductwork in other areas and buildings.

  13. Strain monitoring averts line failure in Rockies

    SciTech Connect (OSTI)

    Miller, B.; Bukovansky, M.

    1987-08-10

    The case history of a landslide in the U.S. Rocky Mountains shows that the potential for pipeline monitoring in geologically sensitive areas, those subject to landslides and subsidence, for example. A properly installed monitoring system monitored by the pipeline operator, Western Gas Supply Co. (West Gas), Denver, provided an early warning of increasing line strains. The problem was complicated by rugged topography which is described here. Stability analysis was the key technique utilized in the process.

  14. Rocky Mountain Research Station and LANL build

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    tech tool predicts fire behavior in bark beetle-ravaged forests August 9, 2012 Rocky Mountain Research Station and LANL build better computer models LOS ALAMOS, N. M. and FORT COLLINS, CO., August 9, 2012-Fire fighters facing fast-moving wildfires need better tools to predict erratic fire behavior, especially in forests with dead trees caused by massive outbreaks of bark beetles whose predations create an abundance of dead fuel and changes in the tree canopy structure. Tools typically available

  15. Technology Development Advances EM Cleanup | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Development Advances EM Cleanup Technology Development Advances EM Cleanup The unique nature of many of EM's remaining facilities will require a strong and responsive engineering and technology program to improve work and public safety, and reduce costs and environmental impacts while completing the cleanup program. A Ceramic membrane to Recycle Caustic Waste Processing Annual Technology Development Report 2007

  16. The Office of Environmental Management Non-Defense Environmental Cleanup |

    Energy Savers [EERE]

    Department of Energy Non-Defense Environmental Cleanup The Office of Environmental Management Non-Defense Environmental Cleanup PDF icon Microsoft Word - 8E2A4440.doc More Documents & Publications Microsoft Word - PSRP Updates 6-25-10_v2 The Office of Environmental Management (EM) Defense Environmental Cleanup The Office of Environmental Management Uranium Enrichment D&D

  17. Protocol_for_Environmental_Management_Cleanup_Projects_(clean).pdf |

    Energy Savers [EERE]

    Department of Energy Protocol_for_Environmental_Management_Cleanup_Projects_(clean).pdf Protocol_for_Environmental_Management_Cleanup_Projects_(clean).pdf PDF icon Protocol_for_Environmental_Management_Cleanup_Projects_(clean).pdf More Documents & Publications External Independent Review (EIR) Standard Operating Procedure (SOP) October 2008 DOE EIR FM.doc External Independent Review (EIR) Standard Operating Procedure (SOP) September 2010

  18. Top EM Leadership to Participate in 2016 National Cleanup Workshop |

    Energy Savers [EERE]

    Department of Energy Top EM Leadership to Participate in 2016 National Cleanup Workshop Top EM Leadership to Participate in 2016 National Cleanup Workshop March 9, 2016 - 12:00pm Addthis Top EM Leadership to Participate in 2016 National Cleanup Workshop WASHINGTON, D.C. - EM's senior leaders are set to join the 2016 National Cleanup Workshop in mid-September in the Washington, D.C.-area. The nuclear cleanup program's leaders scheduled to take part in the workshop include Assistant Secretary

  19. Microsoft Word - Rockies Pipelines and Prices.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    07 1 September 2007 Short-Term Energy Outlook Supplement: Natural Gas in the Rocky Mountains: Developing Infrastructure 1 Highlights * Recent natural gas spot market volatility in the Rocky Mountain States of Colorado, Utah, and Wyoming has been the result of increased production while consumption and pipeline export capacity have remained limited. This Supplement analyzes current natural gas production, pipeline and storage infrastructure in the Rocky Mountains, as well as prospective pipeline

  20. Rocky Mountain, Oklahoma: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Rocky Mountain, Oklahoma: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 35.8053663, -94.7674486 Show Map Loading map... "minzoom":false,"mapp...

  1. Rocky Mountain Power - Energy FinAnswer | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Administrator Rocky Mountain Power Website http:www.rockymountainpower.netbusseepiwyomingnfmref.html State Wyoming Program Type Rebate Program Rebate Amount 0.15kWh...

  2. Rocky Mountain Power - Energy FinAnswer | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Administrator Rocky Mountain Power Website http:www.rockymountainpower.netbusseepiutahnfmref.html State Utah Program Type Rebate Program Rebate Amount 0.12kWh annual...

  3. Rocky Mountain Power - Energy FinAnswer | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Administrator Rocky Mountain Power Website http:www.rockymountainpower.netbusseepiidahonfmref.html State Idaho Program Type Rebate Program Rebate Amount 0.12kWh...

  4. Rendezvous in the Rockies Pool & Spa Low Temperature Geothermal...

    Open Energy Info (EERE)

    Rendezvous in the Rockies Sector Geothermal energy Type Pool and Spa Location Buena Vista, Colorado Coordinates 38.8422178, -106.1311288 Show Map Loading map......

  5. Rocky Mountain Sustainable Enterprises LLC | Open Energy Information

    Open Energy Info (EERE)

    Sustainable Enterprises LLC Jump to: navigation, search Name: Rocky Mountain Sustainable Enterprises LLC Place: Boulder, Colorado Zip: 80302 Product: Colorado-based biofuel...

  6. Cleanup Progress Report - 2010 | Department of Energy

    Energy Savers [EERE]

    0 Cleanup Progress Report - 2010 In this issue, learn about EM's accomplishments in 2010 across the Oak Ridge Reservation. There are many more stories contained within the issue, but here are some of the highlights from each site. East Tennessee Technology Park K-25 Building West Wing Demolished Contaminated Surface Water, Groundwater at ETTP Addressed Reindustrialization Program Continues Effort to Privatize ETTP Oak Ridge National Laboratory Demolition Completed at 3026 C&D Six Facilities

  7. Cleanup Progress Report - 2013 | Department of Energy

    Energy Savers [EERE]

    3 Cleanup Progress Report - 2013 Read about EM's accomplishments across the Oak Ridge Reservation in 2013. Some of the stories include: East Tennessee Technology Park Last standing section of K-25 Building being demolished K-27 Building being prepared for demolition Iconic ETTP Fire Water Tower demolished Efforts under way to commemorate the K-25 site Oak Ridge National Laboratory 3026 hot cells facility downgraded and maintained in surveillance and maintenance mode Upgrade of 4500 Area Gaseous

  8. Cleanup Progress Report - 2015 | Department of Energy

    Energy Savers [EERE]

    5 Cleanup Progress Report - 2015 Read about EM's accomplishments across the Oak Ridge Reservation in 2015. Some of the stories include: East Tennessee Technology Park K-31 Building demolition completed K-27 Building demolition will eliminate final ETTP gaseous diffusion facility K-1037 demo prep begins K-25 historic preservation efforts progress Reindustrialization Program continues land reuse efforts Oak Ridge National Laboratory Components removed from Oak Ridge Research Reactor Prep work

  9. Microsoft Word - California_cleanup.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WIPP Completes California Sites Cleanup CARLSBAD, N.M., June 14, 2010 - The U.S. Department of Energy's Carlsbad Field Office (CBFO) has successfully completed its campaign to clean up all defense- related transuranic (TRU) waste at California's Vallecitos Nuclear Center (VNC) near Sunol and Lawrence Livermore National Laboratory (LLNL) Site 300, east of Livermore. The last shipment of defense related TRU waste from VNC was shipped to Idaho National Laboratory on June 7. Following the

  10. Richland Operations Office Cleanup Strategy, Scope

    Energy Savers [EERE]

    Richland Operations Office Cleanup Strategy, Scope Matt McCormick Manager Richland Operations Office May 1, 2014 John Ciucci Chief Operating Officer CH2M HILL Plateau Remediation Company Scott Sax President and Project Manager Washington Closure Hanford Frank Armijo President and General Manager Mission Support Alliance www.energy.gov/EM 2 Richland Operations Office Hanford Site History Hanford * Hanford began in 1943 as part of the Manhattan Project * Production of plutonium increased during

  11. Pumped storage job is a rocky challenge

    SciTech Connect (OSTI)

    Setzer, S.W.

    1994-03-07

    Georgia mountain lives up to its rugged name as excavators fight some unexpected ground conditions. When settlers pushed into the remote valleys of far northwestern Georgia, they had no idea just how apt the name given one odd geologic formation would become to a new generation of pioneers. Rocky Mountain`s 700 ft of diagonally upthrusting limestone, shale and sandstone layers have become the main antagonists in a decade-long struggle to place an 848-Mw pumped storage power project in and around the mountain.

  12. Cleanup of Nuclear Licensed Facility 57

    SciTech Connect (OSTI)

    Jeanjacques, Michel; Bremond, Marie Pierre; Marchand, Carole; Poyau, Cecile; Viallefont, Cecile; Gautier, Laurent; Masure, Frederic

    2008-01-15

    This summary describes the operations to clean up the equipment of the Nuclear Licensed Facility 57 (NLF 57). Due to the diversity of the research and development work carried out on the reprocessing of spent fuel in it, this installation is emblematic of many of the technical and organizational issues liable to be encountered in the final closure of nuclear facilities. The French atomic energy commission's center at Fontenay aux Roses (CEA-FAR) was created in 1946 to house pile ZOE. Laboratories for fuel cycle research were installed in existing buildings at the site. Work was later concentrated on spent fuel reprocessing, in a pilot workshop referred to as the 'Usine Pu'. In the early sixties, after the dismantling of these first generation facilities, a radiochemistry laboratory dedicated to research and development work on reprocessing was constructed, designated Building 18. During the same decade, more buildings were added: Building 54, storehouses and offices, Building 91, a hall and laboratories for chemical engineering research on natural and depleted uranium. Together, these three building constitute NLF 57. Building 18 architecture featured four similar modules. Each module had three levels: a sub-level consisting of technical galleries and rooms for the liquid effluent tanks, a ground floor and roof space in which the ventilation was installed. Offices, change rooms, four laboratories and a hall were situated on the ground floor. The shielded lines were installed in the laboratories and the halls. Construction of the building took place between 1959 and 1962, and its commissioning began in 1961. The research and development programs performed in NLF 57 related to studies of the reprocessing of spent fuel, including dry methods and the Purex process, techniques for the treatment of waste (vitrification, alpha waste decontamination, etc.) as well as studies and production of transuranic elements for industry and research. In addition to this work, the necessary methods of analysis for monitoring it were also developed. The research and development program finally ended on 30 June 1995. The NLF 57 cleanup program was intended to reduce the nuclear and conventional hazards and minimize the quantities of HLW and MLW during the subsequent dismantling work. To facilitate the organization of the cleanup work, it was divided into categories by type: - treatment and removal of nuclear material, - removal of radioactive sources, - treatment and removal of aqueous liquid waste, - treatment and removal of organic effluents, - treatment and removal of solid waste, - pumping out of the PETRUS tank, - flushing and decontamination of the tanks, - cleanup of Buildings 18 and 91/54. To estimate the cost of the operations and to monitor the progress of the work, an indicator system was put in place based on work units representative of the operation. The values of the work units were periodically updated on the basis of experience feedback. The cleanup progress is now 92% complete (06/12/31): - treatment and removal of nuclear material: 100%, - removal of radioactive sources: 100%, - treatment and removal of aqueous liquid waste: 64%, - treatment and removal of organic effluents: 87%, - treatment and removal of solid waste: 99%, - pumping out of the PETRUS tank: 69%, - flushing and decontamination of tank: 75%, - section cleaning of Buildings 18 and 91/: 90%. The DRSN/SAFAR is the delegated Project Owner for cleanup and dismantling operations. It is also the prime contractor for the cleanup and dismantling operations. SAFAR itself is responsible for operations relating to the CEA activity and those with technical risks (Removal of nuclear materials, Removal of radioactive sources, Pumping out plutonium and transuranic contaminated solvent and Flushing and decontamination of tanks and pipes). All other operations are sub-contracted to specialist companies. The NLF57 cleanup program as executed is capable of attaining activity levels compatible with a future dismantling operation using known and mastered techniques and producing a

  13. Independent Oversight Assessment, Idaho Cleanup Project Sodium Bearing

    Office of Environmental Management (EM)

    Waste Treatment Project - November 2012 | Department of Energy Idaho Cleanup Project Sodium Bearing Waste Treatment Project - November 2012 Independent Oversight Assessment, Idaho Cleanup Project Sodium Bearing Waste Treatment Project - November 2012 November 2012 Assessment of Nuclear Safety Culture at the Idaho Cleanup Project Sodium Bearing Waste Treatment Project This report provides the results of an independent assessment of nuclear safety culture at the Sodium Bearing Waste Treatment

  14. OFFICE OF ENVIRONMENTAL MANAGEMENT NAMES NEW IDAHO CLEANUP MANAGER

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Danielle Miller (208) 526-5709 For Immediate Release May 30, 2014 OFFICE OF ENVIRONMENTAL MANAGEMENT NAMES NEW IDAHO CLEANUP MANAGER Idaho Falls, ID - The U.S. Department of Energy Office of Environmental Management today announced that John (Jack) Zimmerman has been named Deputy Manager of its highly-successful Idaho Cleanup program, which oversees the environmental cleanup and waste management mission at DOE's Idaho site. Mr. Zimmerman has more than 25 years of experience in nuclear

  15. Secretary Chu Highlights Recovery Act Cleanup Progress | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Cleanup Progress Secretary Chu Highlights Recovery Act Cleanup Progress March 23, 2010 - 12:00am Addthis OAK RIDGE, TENN. - Energy Secretary Steven Chu announced today that the Department's Environmental Management program has spent more than $1.5 billion in American Recovery and Reinvestment Act funds on cleanup projects around the country - 25 percent of the program's total - creating an estimated 14,400 jobs since the start of the Recovery Act. "Because of the Recovery Act,

  16. Environmental Remediation program completes legacy mercury cleanup near

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Smith's Marketplace Stories » Legacy slope-side cleanup Environmental Remediation program completes legacy mercury cleanup near Smith's Marketplace Los Alamos National Laboratory performed a high-angle canyon-side cleanup on U.S. Department of Energy property just south of Smith's Marketplace. May 1, 2015 A telescoping crane hoists a spider excavator over Los Alamos Canyon before placing it on the canyon slope to excavate historically contaminated soil. In ongoing efforts to reduce the

  17. IDAHO OPERATIONS OFFICE NAMES NEW IDAHO CLEANUP PROJECT MANAGER

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    doe logo Media Contact: Brad Bugger (208) 526-0833 For Immediate Release: Wednesday, June 29, 2011 IDAHO OPERATIONS OFFICE NAMES NEW IDAHO CLEANUP PROJECT MANAGER Idaho Falls, ID � The Department of Energy Idaho Operations Office today announced that James Cooper has been named deputy manager of its highly-successful Idaho Cleanup Project, which oversees the environmental cleanup and waste management mission at DOE's Idaho site. Cooper has more than 30 years of experience in commercial and

  18. Energy Department Announces Achievement of Major Cleanup Milestone at

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Savannah River Site | Department of Energy Achievement of Major Cleanup Milestone at Savannah River Site Energy Department Announces Achievement of Major Cleanup Milestone at Savannah River Site December 19, 2014 - 3:30pm Addthis News Media Contact 202-586-4940 Energy Department Announces Achievement of Major Cleanup Milestone at Savannah River Site Department Issues Path Forward for Closing Additional Radioactive Waste Storage Tanks in H Tank Farm WASHINGTON - Today, the Department of

  19. Voluntary Protection Program Onsite Review, Idaho Cleanup Project- June

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2007 | Department of Energy Idaho Cleanup Project- June 2007 Voluntary Protection Program Onsite Review, Idaho Cleanup Project- June 2007 June 2007 Evaluation to determine whether the Idaho Cleanup Project is continuing to perform at a level deserving DOE-VPP Star recognition. This report summarizes the results of the HSS DOE-VPP Team's evaluation of Facilities Engineering Services KCP, LLC during the period of June 4-15, 2007, and provides the Chief Health, Safety and Security Officer with

  20. EM's Richland Operations Office Completes Chromium Cleanup along Columbia

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    River | Department of Energy Richland Operations Office Completes Chromium Cleanup along Columbia River EM's Richland Operations Office Completes Chromium Cleanup along Columbia River September 24, 2015 - 12:25pm Addthis The inset photo shows Hanford's D and DR Reactor area during operations in the 1950s, and the larger photo shows how the site looked during final backfill activities earlier this year after a chromium contamination cleanup project. The inset photo shows Hanford's D and DR

  1. The Application of NEPA to CERCLA Cleanups | Department of Energy

    Energy Savers [EERE]

    The Application of NEPA to CERCLA Cleanups The Application of NEPA to CERCLA Cleanups On March 31, 1994, officials from the Departrnent of Energy (DOE), the Environmental Protection Agency (EPA), and the Council on Environmental Quality (CEQ) met with then Acting Assistant Attorney General Lois Schiffer and other representatives of the Department of Justice (DOJ) to discuss the issue of the relationship of the National Environmental Policy Act (NEPA) to the cleanup of federal facilities under

  2. Oak Ridge National Laboratory Cleanup | Department of Energy

    Energy Savers [EERE]

    Oak Ridge National Laboratory Cleanup Oak Ridge National Laboratory Cleanup This fact sheet provides an update on all of the current cleanup projects at the site, and it also lists the major projects that were completed at the Oak Ridge National Laboratory. This document dicusses the following projects: Tank W-1A Removal Action Project Building 3026 Hot Cells Facility Non-Reactor Facilities Removal Action 2000 Complex D&D Project Bethel Valley Burial Grounds Project U-233 Material

  3. Washington Closure Hanford: Ten Years of River Corridor Cleanup |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Washington Closure Hanford: Ten Years of River Corridor Cleanup Washington Closure Hanford: Ten Years of River Corridor Cleanup December 17, 2015 - 12:30pm Addthis Contract-Timeline-E1511010_4-B_756px.jpg This timeline shows contractor Washington Closure Hanford's accomplishments over the past 10 years through its River Corridor Closure Contract. Addthis Related Articles EM Update Newsletter Spotlights River Corridor Cleanup at Hanford Site River Corridor Achievements

  4. Enterprise Assessments Review, Idaho Cleanup Project - September 2014 |

    Office of Environmental Management (EM)

    Department of Energy Idaho Cleanup Project - September 2014 Enterprise Assessments Review, Idaho Cleanup Project - September 2014 September 2014 Review of the Idaho Cleanup Project Integrated Waste Treatment Unit Federal Readiness Assessment at the Idaho Site The U.S. Department of Energy (DOE) independent Office of Enterprise Assessments (EA) was established in May 2014 and assumed responsibility for managing the Department's Independent Oversight Program for the Department's former Office

  5. Manhattan Project Truck Unearthed in Recovery Act Cleanup | Department of

    Office of Environmental Management (EM)

    Energy Manhattan Project Truck Unearthed in Recovery Act Cleanup Manhattan Project Truck Unearthed in Recovery Act Cleanup A Los Alamos National Laboratory (LANL) excavation crew working on an American Recovery and Reinvestment Act cleanup project has uncovered the remnants of a 1940s military truck buried in a Manhattan Project landfill. The truck was unearthed inside a sealed building where digging is taking place at Material Disposal Area B (MDA-B), the Lab's first hazardous and

  6. Idaho Cleanup Project Clearance Limits for Personal Property | Department

    Office of Environmental Management (EM)

    of Energy Idaho Cleanup Project Clearance Limits for Personal Property Idaho Cleanup Project Clearance Limits for Personal Property Kevin Konzen*, CH2M-WG Idaho, LLC ; Craig Nesshoefer, Idaho Cleanup Project Abstract: CH2M-WG Idaho, LLC (CWI) had sought alternative surface clearance limits for personal property from those referenced in DOE Order 458.1, which were approved September 2013 by the Department of Energy. Because much of the property would remain within DOE control, implementation

  7. Chromium Groundwater Cleanup in Mortandad Canyon | Department of Energy

    Office of Environmental Management (EM)

    Cleanup in Mortandad Canyon Chromium Groundwater Cleanup in Mortandad Canyon Topic: Cheryl Rodriguez DOE and Danny Katzman LANL, Provided Information on the Status of the Characterization of the Chromium Groundwater Plume in Mortandad Canyon. Possible Clean-up Strategies were also covered in the Information Provided. PDF icon Chromium Update - September 24, 2014 More Documents & Publications Chromium Interim Measures Project and Ongoing Plume Investigation Chromium Groundwater Remediation

  8. EM Leads Successful Workshop Supporting Fukushima Cleanup | Department of

    Office of Environmental Management (EM)

    Energy Leads Successful Workshop Supporting Fukushima Cleanup EM Leads Successful Workshop Supporting Fukushima Cleanup August 8, 2013 - 12:00pm Addthis TOKYO - An EM-led U.S. delegation conducted its third workshop last month to provide expertise to Japanese officials leading the cleanup of the Fukushima Daiichi Nuclear Power Plant site and surrounding area, this time addressing priorities identified by Japan's government agencies. At the request of the Japanese Ministry of Environment

  9. Particulate hot gas stream cleanup technical issues

    SciTech Connect (OSTI)

    Pontius, D.H.; Snyder, T.R.

    1999-09-30

    The analyses of hot gas stream cleanup particulate samples and descriptions of filter performance studied under this contract were designed to address problems with filter operation that have been linked to characteristics of the collected particulate matter. One objective of this work was to generate an interactive, computerized data bank of the key physical and chemical characteristics of ash and char collected from operating advanced particle filters and to relate these characteristics to the operation and performance of these filters. The interactive data bank summarizes analyses of over 160 ash and char samples from fifteen pressurized fluidized-bed combustion and gasification facilities utilizing high-temperature, high pressure barrier filters.

  10. Microgap flat panel display

    DOE Patents [OSTI]

    Wuest, Craig R. (Danville, CA)

    1998-01-01

    A microgap flat panel display which includes a thin gas-filled display tube that utilizes switched X-Y "pixel" strips to trigger electron avalanches and activate a phosphor at a given location on a display screen. The panel utilizes the principal of electron multiplication in a gas subjected to a high electric field to provide sufficient electron current to activate standard luminescent phosphors located on an anode. The X-Y conductive strips of a few micron widths may for example, be deposited on opposite sides of a thin insulating substrate, or on one side of the adjacent substrates and function as a cathode. The X-Y strips are separated from the anode by a gap filled with a suitable gas. Electrical bias is selectively switched onto X and Y strips to activate a "pixel" in the region where these strips overlap. A small amount of a long-lived radioisotope is used to initiate an electron avalanche in the overlap region when bias is applied. The avalanche travels through the gas filled gap and activates a luminescent phosphor of a selected color. The bias is adjusted to give a proportional electron multiplication to control brightness for given pixel.

  11. Microgap flat panel display

    DOE Patents [OSTI]

    Wuest, C.R.

    1998-12-08

    A microgap flat panel display is disclosed which includes a thin gas-filled display tube that utilizes switched X-Y ``pixel`` strips to trigger electron avalanches and activate a phosphor at a given location on a display screen. The panel utilizes the principal of electron multiplication in a gas subjected to a high electric field to provide sufficient electron current to activate standard luminescent phosphors located on an anode. The X-Y conductive strips of a few micron widths may for example, be deposited on opposite sides of a thin insulating substrate, or on one side of the adjacent substrates and function as a cathode. The X-Y strips are separated from the anode by a gap filled with a suitable gas. Electrical bias is selectively switched onto X and Y strips to activate a ``pixel`` in the region where these strips overlap. A small amount of a long-lived radioisotope is used to initiate an electron avalanche in the overlap region when bias is applied. The avalanche travels through the gas filled gap and activates a luminescent phosphor of a selected color. The bias is adjusted to give a proportional electron multiplication to control brightness for given pixel. 6 figs.

  12. Absolute calibration of optical flats

    DOE Patents [OSTI]

    Sommargren, Gary E.

    2005-04-05

    The invention uses the phase shifting diffraction interferometer (PSDI) to provide a true point-by-point measurement of absolute flatness over the surface of optical flats. Beams exiting the fiber optics in a PSDI have perfect spherical wavefronts. The measurement beam is reflected from the optical flat and passed through an auxiliary optic to then be combined with the reference beam on a CCD. The combined beams include phase errors due to both the optic under test and the auxiliary optic. Standard phase extraction algorithms are used to calculate this combined phase error. The optical flat is then removed from the system and the measurement fiber is moved to recombine the two beams. The newly combined beams include only the phase errors due to the auxiliary optic. When the second phase measurement is subtracted from the first phase measurement, the absolute phase error of the optical flat is obtained.

  13. Cleanup Contractor at Paducah Site Receives Performance Excellence Award

    Broader source: Energy.gov [DOE]

    PADUCAH, Ky. – The environmental cleanup contractor at EM’s Paducah site has been honored for demonstrating serious commitment to performance improvement principles.

  14. Probing Fukushima with cosmic rays should help speed cleanup...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Probing Fukushima with cosmic rays Probing Fukushima with cosmic rays should help speed cleanup of damaged plant The initiative could reduce the time required to clean up the ...

  15. Cleanup Contractor Achieves ‘Elite’ Nuclear Material Accountability Status

    Broader source: Energy.gov [DOE]

    PADUCAH, Ky. – EM’s cleanup contractor at the Paducah site has received national acclaim for timeliness of reporting and promptness in reconciling nuclear material inventories.

  16. DOE Issues Draft RFP for Idaho Cleanup Project Core

    Broader source: Energy.gov [DOE]

    Cincinnati – The U.S. Department of Energy (DOE) today issued a Draft Request for Proposal (DRFP) for the Idaho Cleanup Project (ICP) Core procurement.

  17. Draft Public Involvement Advice for Central Plateau Cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    V0, 12914 Draft Public Involvement Advice for Central Plateau Cleanup Principles Issue managers: Pollet, Mattson, Vanni, Plahuta, Catrell Background The Tri-Party Agencies are...

  18. Lab receives an additional $19 million for environmental cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2016 all issues All Issues submit Lab receives an additional 19 million for environmental cleanup Lab also selects local businesses for five-year contracts June 1, 2013...

  19. Recovery Act funds advance cleanup efforts at Cold War site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    historic Technical Area 21. "These buildings served their purpose during a difficult time in American history," said LANL Recovery Act cleanup director Bruce Schappell. "It's...

  20. Abandoned Uranium Mine Technical Services and Cleanup Industry...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Abandoned Uranium Mine Technical Services and Cleanup Industry Day In January 2015, the United States (U.S.) and the Anadarko Litigation Trust ("Litigation Trust") entered into a...

  1. Energy Secretary Moniz to Speak at DOE National Cleanup Workshop |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Moniz to Speak at DOE National Cleanup Workshop Energy Secretary Moniz to Speak at DOE National Cleanup Workshop September 2, 2015 - 10:30am Addthis Energy Secretary Moniz to Speak at DOE National Cleanup Workshop U.S. Energy Secretary Ernest Moniz U.S. Energy Secretary Ernest Moniz Energy Secretary Moniz to Speak at DOE National Cleanup Workshop U.S. Energy Secretary Ernest Moniz WASHINGTON, D.C. - U.S. Energy Secretary Ernest Moniz is set to provide opening remarks at

  2. DNFSB Chairman Connery to Speak at DOE National Cleanup Workshop |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy DNFSB Chairman Connery to Speak at DOE National Cleanup Workshop DNFSB Chairman Connery to Speak at DOE National Cleanup Workshop September 15, 2015 - 12:00pm Addthis DNFSB Chairman Connery to Speak at DOE National Cleanup Workshop WASHINGTON, D.C. - Defense Nuclear Facilities Safety Board (DNFSB) Chairman Joyce Connery is set to speak at the first DOE National Cleanup Workshop, scheduled to be held Sept. 29-30 in the Washington, D.C. area. Connery joins a list of

  3. FY14 Guidelines for Brownfields Cleanup Grants | Open Energy...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: FY14 Guidelines for Brownfields Cleanup GrantsPermittingRegulatory...

  4. DOE Announces Start of Recovery Act Funded Cleanup Projects at...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office announced that cleanup of the Old Salvage Yard at the Y-12 National Security Complex, has started with funding received from the American Recovery and Reinvestment Act...

  5. IMPORTANT CLEANUP PROJECT TO RESUME AT IDAHO NATIONAL LABORATORY

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the Department of Energy for other cleanup work at the INL, including decontaminating and decommissioning three nuclear reactors - started in 2005 and completed last year. That...

  6. Rocky Mountain Basins Produced Water Database

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Historical records for produced water data were collected from multiple sources, including Amoco, British Petroleum, Anadarko Petroleum Corporation, United States Geological Survey (USGS), Wyoming Oil and Gas Commission (WOGC), Denver Earth Resources Library (DERL), Bill Barrett Corporation, Stone Energy, and other operators. In addition, 86 new samples were collected during the summers of 2003 and 2004 from the following areas: Waltman-Cave Gulch, Pinedale, Tablerock and Wild Rose. Samples were tested for standard seven component "Stiff analyses", and strontium and oxygen isotopes. 16,035 analyses were winnowed to 8028 unique records for 3276 wells after a data screening process was completed. [Copied from the Readme document in the zipped file available at http://www.netl.doe.gov/technologies/oil-gas/Software/database.html] Save the Zipped file to your PC. When opened, it will contain four versions of the database: ACCESS, EXCEL, DBF, and CSV formats. The information consists of detailed water analyses from basins in the Rocky Mountain region.

  7. Creative problem solving at Rocky Reach

    SciTech Connect (OSTI)

    Bickford, B.M.; Garrison, D.H.

    1997-04-01

    Tainter gate inspection and thrust bearing cooling system problems at the 1287-MW Rocky Reach hydroelectric project on the Columbia River in Washington are described. Gate inspection was initiated in response to a failure of similar gates at Folsom Dam. The approach involved measuring the actual forces on the gates and comparing them to original model study parameters, rather than the traditional method of building a hydraulic model. Measurement and visual inspection was completed in one day and had no effect on migration flows. Two problems with the thrust bearing cooling system are described. First, whenever a generating unit was taken off line, cooling water continued circulating and lowered oil temperatures. The second problem involved silt buildup in flow measuring device tubes on the cooling water system. Modifications to correct cooling system problems and associated costs are outlined.

  8. Los Alamos Field Office Legacy Cleanup Summary November 2015 | Department

    Broader source: Energy.gov (indexed) [DOE]

    of Energy Topics: Safety Contracts Acquisition Transition Key Events PDF icon EM-LA Cleanup Summary - November 2015 More Documents & Publications Department of Energy Accomplishments NNMCAB Board Minutes: September 30, 2015 Legacy Clean-up Completion Project Overview

  9. IDAHO OPERATIONS OFFICE NAMES NEW IDAHO CLEANUP PROJECT MANAGER

    Broader source: Energy.gov [DOE]

    Idaho Falls, ID The Department of Energy Idaho Operations Office today announced that James Cooper has been named deputy manager of its highly-successful Idaho Cleanup Project, which oversees the environmental cleanup and waste management mission at DOEs Idaho site.

  10. Flat Ridge Wind Farm | Open Energy Information

    Open Energy Info (EERE)

    Flat Ridge Wind Farm Jump to: navigation, search Name Flat Ridge Wind Farm Facility Flat Ridge Wind Farm Sector Wind energy Facility Type Commercial Scale Wind Facility Status In...

  11. A message of appreciation from ORP to its cleanup partners | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy A message of appreciation from ORP to its cleanup partners A message of appreciation from ORP to its cleanup partners Addthis Description A message of appreciation from ORP to its cleanup partners

  12. SSRL HEADLINES Sep 2006

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    site clean-up would cost 37 billion and take nearly 70 years. Independent contractor Kaiser-Hill and the DOE, working in close coordination with Rocky Flats stakeholders, devised...

  13. Public Understanding of Cleanup Levels Discussion Public Involvement Committee Meeting - Hanford Advisory Board

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Discussion Public Involvement Committee Meeting - Hanford Advisory Board Wednesday, October 31, 2012 - Red Lion Hanford House, Richland Page 1 of 4 Cleanup Levels One of the reasons we want public involvement on cleanup decisions is to gather input about what kind of cleanup end-state the public wants, how clean is clean, or put another way, how dirty is acceptable. Cleanup decisions are complicated. Cleanup levels necessary to be protective dictate which cleanup actions are viable to consider.

  14. Soil and Groundwater Cleanup - In-Situ Grouting, Lessons Learned (Post

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CD-4), Environmental Management Cleanup, May 2011 | Department of Energy Soil and Groundwater Cleanup - In-Situ Grouting, Lessons Learned (Post CD-4), Environmental Management Cleanup, May 2011 Soil and Groundwater Cleanup - In-Situ Grouting, Lessons Learned (Post CD-4), Environmental Management Cleanup, May 2011 PDF icon 000646_EM-C_Soil_and_Groundwater_Cleanup_-_In-Situ_Grouting_Lessons_Learned_Post_CD-4_15_Jun_11.pdf More Documents & Publications Type B Accident Investigation Board

  15. DOE Completes Cleanup at New York, California Sites - Recovery Act funds

    Office of Environmental Management (EM)

    accelerate cleanup; support job creation and footprint reduction | Department of Energy Cleanup at New York, California Sites - Recovery Act funds accelerate cleanup; support job creation and footprint reduction DOE Completes Cleanup at New York, California Sites - Recovery Act funds accelerate cleanup; support job creation and footprint reduction July 1, 2011 - 12:00pm Addthis Media Contact 202-586-4940 WASHINGTON, D.C. - Last month, the U.S. Department of Energy completed the cleanup of

  16. Improving oiled shoreline cleanup with COREXIT 9580

    SciTech Connect (OSTI)

    Fiocco, R.J.; Lessard, R.R.; Canevari, G.P.

    1996-08-01

    The cleanup of oiled shorelines has generally been by mechanical, labor-intensive means. The use of a chemical shoreline cleaner to assist in water-flushing oil from the surfaces can result in more complete and more rapid cleaning. Not only is the cleaning process more efficient, but it can also be less environmentally damaging since there is potentially much less human intrusion and stress on the biological community. This paper describes research and applications of COREXIT 9580 shoreline cleaner for treatment of oiled shorelines, including four recent applications in Puerto Rico, Bermuda, Texas and Nova Scotia. Research work on shoreline vegetation, such as mangroves, has also demonstrated the potential use of this product to save and restore oiled vegetation.

  17. Windy Flats IIa extension | Open Energy Information

    Open Energy Info (EERE)

    IIa extension Jump to: navigation, search Name Windy Flats IIa extension Facility Windy Flats IIa extension Sector Wind energy Facility Type Commercial Scale Wind Facility Status...

  18. Windy Flats Phase III | Open Energy Information

    Open Energy Info (EERE)

    Phase III Jump to: navigation, search Name Windy Flats Phase III Facility Windy Flats Phase III Sector Wind energy Facility Type Commercial Scale Wind Facility Status Proposed...

  19. Flat Water Wind Farm | Open Energy Information

    Open Energy Info (EERE)

    Water Wind Farm Jump to: navigation, search Name Flat Water Wind Farm Facility Flat Water Wind Farm Sector Wind energy Facility Type Commercial Scale Wind Facility Status In...

  20. Rocky Hill, New Jersey: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Hide Map This article is a stub. You can help OpenEI by expanding it. Rocky Hill is a borough in Somerset County, New Jersey. It falls under New Jersey's 7th...

  1. Rocky Hill, Connecticut: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Rocky Hill, Connecticut: Energy Resources Jump to: navigation, search This article is a stub. You can help OpenEI by expanding it. Equivalent URI DBpedia Coordinates 41.6648216,...

  2. Rocky Ripple, Indiana: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    This article is a stub. You can help OpenEI by expanding it. Rocky Ripple is a town in Marion County, Indiana. It falls under Indiana's 7th congressional district.12 References...

  3. Rocky Mountain White Tilapia Aquaculture Low Temperature Geothermal...

    Open Energy Info (EERE)

    56.00x109 Btuyr 16.40 GWhyr Delat T 10.00 F Load Factor 0.80 Contact Erwin Young; 719-589-3032 References Oregon Institute of Technology's Geo-Heat Center1 Rocky...

  4. Rocky Mountain Power- WattSmart Residential Efficiency Program

    Broader source: Energy.gov [DOE]

    Rocky Mountain Power offers the Home Energy Savings Program for their residential Wyoming customers to improve the energy efficiency of their homes. Full details are available on the program website. 

  5. DOE - Office of Legacy Management -- Rocky Mountain Research Laboratories -

    Office of Legacy Management (LM)

    CO 06 Rocky Mountain Research Laboratories - CO 06 FUSRAP Considered Sites Site: ROCKY MOUNTAIN RESEARCH LABORATORIES (CO.06 ) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: 1020 Yuma Street , Denver , Colorado CO.06-1 Evaluation Year: Circa 1987 CO.06-3 Site Operations: Processed beryllium on a pilot scale. CO.06-1 Site Disposition: Eliminated - No indication of radioactive materials handled at the site CO.06-2 Radioactive

  6. Elemental compositions of two extrasolar rocky planetesimals

    SciTech Connect (OSTI)

    Xu, S.; Jura, M.; Klein, B.; Zuckerman, B. [Department of Physics and Astronomy, University of California, Los Angeles, CA 90095-1562 (United States); Koester, D., E-mail: sxu@astro.ucla.edu, E-mail: jura@astro.ucla.edu, E-mail: kleinb@astro.ucla.edu, E-mail: ben@astro.ucla.edu, E-mail: koester@astrophysik.uni-kiel.de [Institut fur Theoretische Physik und Astrophysik, University of Kiel, D-24098 Kiel (Germany)

    2014-03-10

    We report Keck/HIRES and Hubble Space Telescope/COS spectroscopic studies of extrasolar rocky planetesimals accreted onto two hydrogen atmosphere white dwarfs, G29-38 and GD 133. In G29-38, eight elements are detected, including C, O, Mg, Si, Ca, Ti, Cr, and Fe while in GD 133, O, Si, Ca, and marginally Mg are seen. These two extrasolar planetesimals show a pattern of refractory enhancement and volatile depletion. For G29-38, the observed composition can be best interpreted as a blend of a chondritic object with some refractory-rich material, a result from post-nebular processing. Water is very depleted in the parent body accreted onto G29-38, based on the derived oxygen abundance. The inferred total mass accretion rate in GD 133 is the lowest of all known dusty white dwarfs, possibly due to non-steady state accretion. We continue to find that a variety of extrasolar planetesimals all resemble to zeroth order the elemental composition of bulk Earth.

  7. Tritium research laboratory cleanup and transition project final report

    SciTech Connect (OSTI)

    Johnson, A.J.

    1997-02-01

    This Tritium Research Laboratory Cleanup and Transition Project Final Report provides a high-level summary of this project`s multidimensional accomplishments. Throughout this report references are provided for in-depth information concerning the various topical areas. Project related records also offer solutions to many of the technical and or administrative challenges that such a cleanup effort requires. These documents and the experience obtained during this effort are valuable resources to the DOE, which has more than 1200 other process contaminated facilities awaiting cleanup and reapplication or demolition.

  8. DOE Issues Final RFP for Idaho Cleanup Project Core

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Management Consolidated Business Center 250 E. 5th Street, Suite 500, Cincinnati, Ohio 45202 Lynette Chafin, 513-246-0461 Lynette.Chafin@emcbc.doe.gov Danielle Miller, 208-526-5709 millerdc@id.doe.gov March 16, 2015 DOE Issues Final RFP for Idaho Cleanup Project Core Cincinnati - The U.S. Department of Energy (DOE) today issued the final Request for Proposal (RFP) for the Idaho Cleanup Project (ICP) Core procurement. At the end of this contract the majority of cleanup will be

  9. Idaho Site Completes Cleanup Milestone Ahead of Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    News Media Contact: Erik Simpson (208) 360-0426 For Immediate Release Date: June 23, 2010 Idaho Site Completes Cleanup Milestone Ahead of Schedule Idaho Falls, ID � The Department of Energy�s Idaho Operations Office, through the efforts of its cleanup contractor, CH2M-WG Idaho (CWI), recently reached a key cleanup milestone three weeks ahead of schedule by completing the transfer of nearly 6.6 metric tons of spent nuclear fuel from wet to dry storage. �The transfer of spent nuclear fuel

  10. Recovery Act Investment Accelerates Cleanup Work at DOE's Paducah Site |

    Energy Savers [EERE]

    Department of Energy Investment Accelerates Cleanup Work at DOE's Paducah Site Recovery Act Investment Accelerates Cleanup Work at DOE's Paducah Site July 15, 2011 - 12:00pm Addthis UF6 piping deactivation The black inlet hose is attached to a negative air machine that allows Feed Plant cleanup workers to safely deactivate uranium hexafluoride (UF6) piping, seen at right of the lift supporting the crew. UF6 piping deactivation The black inlet hose is attached to a negative air machine that

  11. DOE Awards Legacy Cleanup Contract | Department of Energy

    Office of Environmental Management (EM)

    Legacy Cleanup Contract DOE Awards Legacy Cleanup Contract September 23, 2015 - 6:00pm Addthis Media Contact Lynette Chafin, 513-246-0461, Lynette.Chafin@emcbc.doe.gov Cincinnati - The U.S. Department of Energy (DOE) today announced the award of a Cost-Plus-Award Fee contract to Los Alamos National Security, LLC (LANS) of Los Alamos, NM. This bridge contract is for the Office of Environmental Management (EM) funded legacy cleanup activities at the Los Alamos National Laboratory (LANL). LANS is

  12. DOE Completes TRU Waste Cleanup at Bettis | Department of Energy

    Office of Environmental Management (EM)

    TRU Waste Cleanup at Bettis DOE Completes TRU Waste Cleanup at Bettis September 23, 2011 - 12:00pm Addthis Media Contact Deb Gill www.wipp.energy.gov 575-234-7270 CARLSBAD, N.M. - The U.S. Department of Energy (DOE) has successfully completed cleanup of all Cold War legacy transuranic (TRU) waste at the Bettis Atomic Power Laboratory (BAPL) near Pittsburgh, Pa., permanently disposing of it at the Waste Isolation Pilot Plant (WIPP). BAPL is the 20th site to be completely cleaned of legacy TRU

  13. DOE Extends Idaho Cleanup Project Contract | Department of Energy

    Office of Environmental Management (EM)

    Idaho Cleanup Project Contract DOE Extends Idaho Cleanup Project Contract September 29, 2015 - 6:00pm Addthis Media Contact Danielle Miller, 208-526-5709 Idaho Falls, ID - The U.S. Department of Energy's Office of Environmental Management (EM) today announced it is extending its contract for the Idaho Cleanup Project at the Idaho Site for a period of 6 months. The contract period for the current contractor, CH2M-WG Idaho, LLC, had been scheduled to expire on September 30, 2015. Today's contract

  14. 2012 Congressional Nuclear Cleanup Caucus Briefings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 Congressional Nuclear Cleanup Caucus Briefings 2012 Congressional Nuclear Cleanup Caucus Briefings The Congressional Nuclear Cleanup Caucus serves as a way to brief members of Congress and their staff on EM headquarters and site activities, including budget, safety and project progress. PDF icon 02/16/2012 - FY 2013 Budget Overview PDF icon 03/07/2012 - Richland Operations Office, WA PDF icon 03/21/2012 - Oak Ridge, TN PDF icon 03/22/2012 - Portsmouth/Paducah Project Office, OH-KY PDF icon

  15. DHS Flat Stanley Project | Department of Energy

    Office of Environmental Management (EM)

    DHS Flat Stanley Project DHS Flat Stanley Project The Department of Homeland Security (DHS) and the Stop.Think.Connect.(STC) campaign are co-sponsoring the Flat Stanley Project to teach kids about cybersecurity. With the Flat Stanley App, kids create their own "Flat Stanley" or "Flat Stella" character to learn about online safety. For more information or to access the Flat Stanley App, visit: http://www.flatstanley.com. To learn more about keeping kids safe online, click

  16. RECOVERY ACT LEADS TO CLEANUP OF TRANSURANIC WASTE SITES

    Broader source: Energy.gov [DOE]

    Carlsbad, NM - The recent completion of transuranic (TRU) waste cleanup at Vallecitos Nuclear Center (VNC) and Lawrence Livermore National Laboratory (LLNL) Site 300 in California brings the total number of sites cleared of TRU waste to 17.

  17. DOE Selects Contractor for California Energy Technology Engineering Center Cleanup

    Broader source: Energy.gov [DOE]

    Cincinnati - The Department of Energy (DOE) today awarded a competitive $25.7 million task order for cleanup activities at the Energy Technology Engineering Center (ETEC) to North Wind of Idaho Falls, Idaho.

  18. EM SSAB Contributes Community Views to Clean-up Decisions

    Broader source: Energy.gov [DOE]

    EM has made public participation a fundamental component of its cleanup mission and has found that the EM SSAB, which draws upon diverse community viewpoints to provide advice and recommendations,...

  19. Department of Energy Idaho - Idaho Cleanup Project Contract

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    & Solicitations > ICP Contract Idaho Cleanup Project Contract Basic Contract Contract Modifications Documents Related to the ICP Contract Last Updated: 11/04/2015 Privacy Statement and Disclaimer Contact Aaron S Nebeker

  20. EM, UCOR Quickly Reconcile Oak Ridge Cleanup Contract

    Broader source: Energy.gov [DOE]

    OAK RIDGE, Tenn. – At a ceremony today, Oak Ridge’s Environmental Management (EM) program and its prime contractor, URS | CH2M Oak Ridge, LLC (UCOR) celebrated the completion of the site’s reconciled cleanup contract.

  1. Passive Groundwater Cleanup Measures Save Savannah River Site...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    In recent years, increased use of simple, multi-phased passive cleanup measures - a move away from the highly mechanized pump-and-treat facilities - has reduced the migration of ...

  2. NNSA Product Aids in Anthrax Clean-up

    National Nuclear Security Administration (NNSA)

    Product Aids in Anthrax Clean-up WASHINGTON, D.C. - A decontamination formulation developed at a U.S. Department of EnergyNational Nuclear Security Administration (NNSA) ...

  3. Oak Ridge Reflects on 30 Years of Cleanup

    Broader source: Energy.gov [DOE]

    OAK RIDGE, Tenn. – Oak Ridge’s EM program hosted an event this month that documented the site’s environmental cleanup efforts since 1983, six years before the official founding of the Department’s EM.

  4. Idaho Site Advances Recovery Act Cleanup after Inventing Effective Treatment

    Broader source: Energy.gov [DOE]

    For the first time in history, workers at the Idaho site achieved success in the initial cleanup of potentially dangerous sodium in a decommissioned nuclear reactor using an innovative treatment...

  5. Agreement on New Commitments for Hanford Tank Waste Cleanup Sent...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... And when we needed them to help clean up the contamination left behind, they stepped up again. So we not only have a legal obligation to meet cleanup milestones, we have a moral ...

  6. Legacy Clean-up Completion Project Overview | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Bob Pfaff provided the members with information regarding the status of the Fiscal Year 2016 Budget request. Information included in the presentation also covered strategic planning and the remaining workscope in the Los Alamos National Laboratory Legacy Clean-up Project. PDF icon FY'16 Overview - July 29, 2015 More Documents & Publications Executing Legacy Clean-up at LANL NNMCAB Board Minutes: July 29, 2015 Taos Department of Energy Accomplishments

  7. EM Update Newsletter Spotlights River Corridor Cleanup at Hanford Site |

    Broader source: Energy.gov (indexed) [DOE]

    Department of Energy RICHLAND, Wash. - In this issue of the EM Update newsletter, EM marks the many accomplishments the Richland Operations Office and its contractors have achieved in cleanup along the Columbia River corridor at the Hanford Site. This year marked the 10th anniversary of the River Corridor Closure Contract, the nation's largest environmental cleanup closure project, managed by Washington Closure Hanford. The work has involved projects to clean up existing contamination and

  8. Probing Fukushima with cosmic rays should speed cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Probing Fukushima with cosmic rays should speed cleanup Alumni Link: Opportunities, News and Resources for Former Employees Latest Issue:September 2015 all issues All Issues » submit Probing Fukushima with cosmic rays should speed cleanup The initiative could reduce the time required to clean up the disabled complex by at least a decade and greatly reduce radiation exposure to personnel working at the plant September 2, 2014 New insights to changing the atomic structure of metals Los Alamos

  9. Warehouse Cleanup Project Completed at DOE's Paducah Site | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Warehouse Cleanup Project Completed at DOE's Paducah Site Warehouse Cleanup Project Completed at DOE's Paducah Site January 27, 2015 - 3:06pm Addthis Herb Tyler, David Cassibry, and Roger Nelson review items for characterization. (Photo by Dylan Nichols, LATA Kentucky) Herb Tyler, David Cassibry, and Roger Nelson review items for characterization. (Photo by Dylan Nichols, LATA Kentucky) A crane loads a high‐side railcar for transport to a commercial waste disposal facility after

  10. Recovery Act Creates Jobs, Accelerates Cleanup at DOE's Paducah Site |

    Office of Environmental Management (EM)

    Department of Energy Recovery Act Creates Jobs, Accelerates Cleanup at DOE's Paducah Site Recovery Act Creates Jobs, Accelerates Cleanup at DOE's Paducah Site October 26, 2011 - 8:14am Addthis Brandon Henderson checks a pump in the water treatment facility at the Paducah Gaseous Diffusion Plant. The former Recovery Act engineer now works for the U.S. Enrichment Corp. Brandon Henderson checks a pump in the water treatment facility at the Paducah Gaseous Diffusion Plant. The former Recovery

  11. Paducah Site Undergoing Steady Groundwater Cleanup with Variety of Methods

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Undergoing Steady Groundwater Cleanup with Variety of Methods Paducah Site Undergoing Steady Groundwater Cleanup with Variety of Methods June 1, 2012 - 12:00pm Addthis The yellow outline depicts an area southeast of the C-400 Cleaning Building, background, where electrical resistance heating will be used to remove trichloroethene (TCE) down to 60 feet below ground. Electrodes will heat the chemical into a vapor that can be pumped to the surface and treated in the white

  12. DOE Announces Strategic Engineering and Technology Roadmap for Cleanup of

    Energy Savers [EERE]

    Cold War Era Nuclear Waste | Department of Energy Strategic Engineering and Technology Roadmap for Cleanup of Cold War Era Nuclear Waste DOE Announces Strategic Engineering and Technology Roadmap for Cleanup of Cold War Era Nuclear Waste March 18, 2008 - 10:52am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today released an Engineering and Technology Roadmap (Roadmap), which details initiatives aimed at reducing the technical risks and uncertainties associated with cleaning

  13. Sue Cange Provides Insight on Oak Ridge's Cleanup Progress, Partnerships

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Sue Cange Provides Insight on Oak Ridge's Cleanup Progress, Partnerships Sue Cange Provides Insight on Oak Ridge's Cleanup Progress, Partnerships August 31, 2015 - 12:45pm Addthis Sue Cange, manager for the Oak Ridge Office of Environmental Management Sue Cange, manager for the Oak Ridge Office of Environmental Management OAK RIDGE, Tenn. - Sue Cange, manager for the Oak Ridge Office of Environmental Management, is responsible for safely executing the environmental

  14. Probing Fukushima with cosmic rays should speed cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Probing Fukushima with cosmic rays should speed cleanup Probing Fukushima with cosmic rays should speed cleanup The initiative could reduce the time required to clean up the disabled complex by at least a decade and greatly reduce radiation exposure to personnel working at the plant. June 18, 2014 Los Alamos National Laboratory postdoctoral researcher Elena Guardincerri, right, and undergraduate research assistant Shelby Fellows prepare a lead hemisphere inside a muon tomography machine, which

  15. DOE Idaho site reaches 20-year cleanup milestone

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    IDAHO FALLS, IDAHO, 83403 Media Contact: Brad Bugger (208) 526-0833 For Immediate Release: January 19, 2012 DOE Idaho site reaches 20-year cleanup milestone IDAHO FALLS, ID- In two decades of Superfund cleanup work, the U.S. Department of Energy's Idaho site has removed hundreds of thousands of cubic yards of radioactive and hazardously contaminated soils, excavated radioactive waste buried since the 1950s, removed three nuclear reactors and hundreds of buildings, completely closed three major

  16. Cleanup Chief Visits Portsmouth, Paducah Sites | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cleanup Chief Visits Portsmouth, Paducah Sites Cleanup Chief Visits Portsmouth, Paducah Sites February 11, 2016 - 12:45pm Addthis EM Assistant Secretary Dr. Monica Regalbuto sits in on a procedure review with facility operator Jim Burnett (left) of Fluor Paducah Deactivation Project at C-337, where a former uranium enrichment process building will be the first facility to undergo deposit removal by in-situ chemical treatment. EM Assistant Secretary Dr. Monica Regalbuto sits in on a procedure

  17. Example Cleanup: Removal of Polychlorinated Biphenyls from Hillside 140

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Example Cleanup Removal of Polychlorinated Biphenyls from Hillside 140 Removing the source is one of three defenses in depth, as illustrated at the PCB removal from Hillside 140. August 1, 2013 Men vacuuming PCB contamination from Hillside 140 using large pipes and pullies Vacuuming PCB contamination from Hillside 140 Water and sediment is sampled periodically for contaminants. If PCB waste is present, it is shipped to licensed disposal facilities. Two cleanups of radioactive materials were

  18. Draft Public Involvement Advice for Central Plateau Cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    V0, 12/9/14 Draft Public Involvement Advice for Central Plateau Cleanup Principles Issue managers: Pollet, Mattson, Vanni, Plahuta, Catrell Background The Tri-Party Agencies are developing principles that will guide the cleanup of Hanford's Central Plateau. The Hanford Advisory Board (HAB) believes that the broader public should be involved in the development of these principles. Hanford's Central Plateau is planned to be the final footprint of the Hanford Site. The Central Plateau contains

  19. Groundwater Cleanup Operational Changes Are Being Implemented at Fernald

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Preserve | Department of Energy Groundwater Cleanup Operational Changes Are Being Implemented at Fernald Preserve Groundwater Cleanup Operational Changes Are Being Implemented at Fernald Preserve October 13, 2014 - 6:38pm Addthis What does this project do? Goal 1. Protect human health and the environment. Uranium contamination in the Great Miami Aquifer-at the Fernald Preserve, Ohio, Site-is being removed from the groundwater through a pump-and-treatment operation, which until this year,

  20. EM Delegation Tours UK Cleanup Program's Sellafield Site | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Delegation Tours UK Cleanup Program's Sellafield Site EM Delegation Tours UK Cleanup Program's Sellafield Site May 13, 2013 - 12:00pm Addthis Front row, left to right, NuVision Engineering Vice President Laurie Judd, EM Lead International Affairs Specialist Ana Han, EM Associate Principal Deputy Assistant Secretary Alice Williams and United Kingdom Nuclear Decommissioning Authority (NDA) Head of International Relations John Mathieson; back row, left to right, NDA Sellafield Site

  1. Biogas Impurities and Cleanup for Fuel Cells | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impurities and Cleanup for Fuel Cells Biogas Impurities and Cleanup for Fuel Cells Presentation about biogas technologies and integration with fuel cells. Presented by Shabbir Ahmed, Argonne National Laboratory, at the NREL/DOE Biogas and Fuel Cells Workshop held June 11-13, 2012, in Golden, Colorado. PDF icon june2012_biogas_workshop_ahmed.pdf More Documents & Publications Fuel Quality Issues in Stationary Fuel Cell Systems Expanding the Use of Biogas with Fuel Cell Technologies CHP and

  2. Secretary's Honor Awards Recognize EM's Tank Cleanup, Closure |

    Energy Savers [EERE]

    Department of Energy Secretary's Honor Awards Recognize EM's Tank Cleanup, Closure Secretary's Honor Awards Recognize EM's Tank Cleanup, Closure April 8, 2014 - 12:00pm Addthis Energy Secretary Ernest Moniz, fourth from left, and Deputy Secretary Daniel Poneman, third from right, present the Secretary's Achievement Award to members of the Savannah River Site F-Tank Farm Closure Team. Team members pictured, left to right, are James Rush, William Levitan, Kathleen Martin, Linda Suttora, James

  3. Los Alamos Demolition Work Progresses Toward Goal of Completing Cleanup |

    Energy Savers [EERE]

    Department of Energy Demolition Work Progresses Toward Goal of Completing Cleanup Los Alamos Demolition Work Progresses Toward Goal of Completing Cleanup January 14, 2016 - 12:20pm Addthis The sewage treatment facility before demolition. The sewage treatment facility before demolition. Debris from the sewage treatment facility. Debris from the sewage treatment facility. Site of the demolished sewage treatment facility. Site of the demolished sewage treatment facility. The sewage treatment

  4. Glass Science Could Boost Hanford Cleanup | Department of Energy

    Energy Savers [EERE]

    Glass Science Could Boost Hanford Cleanup Glass Science Could Boost Hanford Cleanup October 29, 2015 - 12:30pm Addthis A canister filled with nonradioactive glass sits on display. A canister filled with nonradioactive glass sits on display. A sample of vitrified glass at EM's Office of River Protection. A sample of vitrified glass at EM's Office of River Protection. A glass scientist works with molten glass. A glass scientist works with molten glass. A canister filled with nonradioactive glass

  5. Grand Challenge Winning Entry Proposes Efficiencies to Tank Waste Cleanup |

    Energy Savers [EERE]

    Department of Energy Grand Challenge Winning Entry Proposes Efficiencies to Tank Waste Cleanup Grand Challenge Winning Entry Proposes Efficiencies to Tank Waste Cleanup December 29, 2015 - 12:55pm Addthis From left, Elaine Diaz, Office of River Protection (ORP) acting chief engineer; John Vienna, Pacific Northwest National Laboratory scientist; Albert Kruger, ORP glass scientist; and Kevin Smith, ORP manager. From left, Elaine Diaz, Office of River Protection (ORP) acting chief engineer;

  6. Passive Groundwater Cleanup Measures Save Savannah River Site Millions of

    Energy Savers [EERE]

    Dollars | Department of Energy Passive Groundwater Cleanup Measures Save Savannah River Site Millions of Dollars Passive Groundwater Cleanup Measures Save Savannah River Site Millions of Dollars November 25, 2015 - 12:20pm Addthis SRNS operators Stanley Creech (left) and Paul Dobson monitor the injection of silver chloride into an aquifer at SRS. SRNS operators Stanley Creech (left) and Paul Dobson monitor the injection of silver chloride into an aquifer at SRS. AIKEN, S.C. - The EM program

  7. Latest 200 Area Demolition Offers Snapshot of Hanford Cleanup Progress:

    Office of Environmental Management (EM)

    Recovery Act Funding Allows Demolition of Power Houses Ahead of Schedule | Department of Energy Latest 200 Area Demolition Offers Snapshot of Hanford Cleanup Progress: Recovery Act Funding Allows Demolition of Power Houses Ahead of Schedule Latest 200 Area Demolition Offers Snapshot of Hanford Cleanup Progress: Recovery Act Funding Allows Demolition of Power Houses Ahead of Schedule March 4, 2011 - 12:00pm Addthis Media Contacts Cameron Hardy, DOE (509) 376-5365 Cameron.Hardy@rl.doe.gov

  8. Hanford Groundwater Contamination Areas Shrink as EM Exceeds Cleanup Goals

    Office of Environmental Management (EM)

    | Department of Energy Groundwater Contamination Areas Shrink as EM Exceeds Cleanup Goals Hanford Groundwater Contamination Areas Shrink as EM Exceeds Cleanup Goals June 26, 2013 - 12:00pm Addthis The 200 West Pump and Treat System is Hanford’s largest facility for treating contaminated groundwater. The 200 West Pump and Treat System is Hanford's largest facility for treating contaminated groundwater. A graphic showing the 200 West Pump and Treat plumes and well network. A graphic

  9. Independent Oversight Review, Idaho Cleanup Project - August 2014 |

    Office of Environmental Management (EM)

    Department of Energy Cleanup Project - August 2014 Independent Oversight Review, Idaho Cleanup Project - August 2014 August 2014 The U.S. Department of Energy?s (DOE) Office of Environment, Safety and Health Assessments, within the DOE Office of Independent Enterprise Assessments (IEA) (formerly the Office of Health, Safety and Security), conducted an independent oversight review of the Integrated Waste Treatment facility contractor readiness assessment (C-RA) at the Idaho Site from January

  10. Wendy Cain named portfolio federal project director for ETTP cleanup |

    Broader source: Energy.gov (indexed) [DOE]

    Department of Energy Oak Ridge Office of Environmental Management (OREM) has named Wendy Cain as its new portfolio federal project director for cleanup of the East Tennessee Technology Park (ETTP). As the portfolio federal project director, Ms. Cain oversees all of the cleanup, demolition, waste disposal, and land transfers at the site. At the forefront, Cain is directing the removal of the K-31 and K-27 buildings, which are the final uranium enrichment facilities at ETTP. In this position,

  11. DOE Surpasses Cleanup Target Ahead of Schedule: Recovery Act Investment

    Office of Environmental Management (EM)

    Saves Money, Trains Workers, Creates Jobs | Department of Energy Surpasses Cleanup Target Ahead of Schedule: Recovery Act Investment Saves Money, Trains Workers, Creates Jobs DOE Surpasses Cleanup Target Ahead of Schedule: Recovery Act Investment Saves Money, Trains Workers, Creates Jobs May 12, 2011 - 12:00pm Addthis Media Contact (202) 586-4940 WASHINGTON, D.C. - The U.S. Department of Energy announced today it has surpassed one of the Obama Administration's High Priority Performance Goals

  12. EM Launches First-Ever Interactive Timeline on Cleanup's History |

    Office of Environmental Management (EM)

    Department of Energy Launches First-Ever Interactive Timeline on Cleanup's History EM Launches First-Ever Interactive Timeline on Cleanup's History March 5, 2014 - 12:00pm Addthis Visitors to EM's booth at the annual Waste Management Symposia international conference participate in demonstrations of the new timeline. Visitors to EM's booth at the annual Waste Management Symposia international conference participate in demonstrations of the new timeline. The timeline details EM’s key

  13. Inversion Breakup in Small Rocky Mountain and Alpine Basins

    SciTech Connect (OSTI)

    Whiteman, Charles D.; Pospichal, Bernhard; Eisenbach, Stefan; Weihs, P.; Clements, Craig B.; Steinacker, Reinhold; Mursch-Radlgruber, Erich; Dorninger, Manfred

    2004-08-01

    Comparisons are made between the post-sunrise breakup of temperature inversions in two similar closed basins in quite different climate settings, one in the eastern Alps and one in the Rocky Mountains. The small, high-altitude, limestone sinkholes have both experienced extreme temperature minima below -50C. On undisturbed clear nights, temperature inversions reach to 120 m heights in both sinkholes, but are much stronger in the drier Rocky Mountain basin (24K versus 13K). Inversion destruction takes place 2.6 to 3 hours after sunrise and is accomplished primarily by subsidence warming associated with the removal of air from the base of the inversion by the upslope flows that develop over the sidewalls. Differences in inversion strengths and post-sunrise heating rates are caused by differences in the surface energy budget, with drier soil and a higher sensible heat flux in the Rocky Mountain sinkhole.

  14. Rocky Mountain Electrical League (RMEL) Physical and Cyber Security

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Conference - January 26-27, 2016 | Department of Energy Rocky Mountain Electrical League (RMEL) Physical and Cyber Security Conference - January 26-27, 2016 Rocky Mountain Electrical League (RMEL) Physical and Cyber Security Conference - January 26-27, 2016 January 4, 2016 - 11:22am Addthis Power SURGE is joint project between the DOE’s Office of Security Assistance and the Department’s Power Marketing Administrations, led by the Western Area Power Marketing Administration. Power

  15. Redelegation Order No. 00-006.02-02 to the Director, Rocky Mountain...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2, Redelegation Order No. 00-006.02-02 to the Director, Rocky Mountain Oilfield Testing Center by Admin Functional areas: Miscellaneous 00-00602-02-DirRockyMtnOilFldTesting.pd...

  16. 2013 Annual Planning Summary for the Rocky Mountain Oilfield Testing Center

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Rocky Mountain Oilfield Testing Center 2013 Annual Planning Summary for the Rocky Mountain Oilfield Testing Center The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2013 and 2014 within the Rocky Mountain Oilfield Testing Center . The Rocky Mountain Oilfield Testing Center's APS was consolidated within the Office of Fossil Energy's APS available here. More Documents & Publications 2013 Annual Planning Summary for the

  17. The Cummins Rocky Mount Engine Plant Case Study | Department of Energy

    Energy Savers [EERE]

    Technical Assistance » Superior Energy Performance » The Cummins Rocky Mount Engine Plant Case Study The Cummins Rocky Mount Engine Plant Case Study sep_logo_borderless.jpg The Cummins Rocky Mount Engine Plant (RMEP) in Rocky Mount, North Carolina is saving over $700,000 annually and achieved a 12.6% energy performance improvement after implementing SEP. (July 2015) PDF icon Cummins' Case Study for Superior Energy Performance More Documents & Publications SEP Case Study Webinar: Cummins

  18. Graphene folding on flat substrates

    SciTech Connect (OSTI)

    Chen, Xiaoming; Zhao, Yadong; Ke, Changhong; Zhang, Liuyang; Wang, Xianqiao

    2014-10-28

    We present a combined experimental-theoretical study of graphene folding on flat substrates. The structure and deformation of the folded graphene sheet are experimentally characterized by atomic force microscopy. The local graphene folding behaviors are interpreted based on nonlinear continuum mechanics modeling and molecular dynamics simulations. Our study on self-folding of a trilayer graphene sheet reports a bending stiffness of about 6.57?eV, which is about four times the reported values for monolayer graphene. Our results reveal that an intriguing free sliding phenomenon occurs at the interlayer van der Waals interfaces during the graphene folding process. This work demonstrates that it is a plausible venue to quantify the bending stiffness of graphene based on its self-folding conformation on flat substrates. The findings reported in this work are useful to a better understanding of the mechanical properties of graphene and in the pursuit of its applications.

  19. Flat space physics from holography

    SciTech Connect (OSTI)

    Bousso, Raphael

    2004-02-06

    We point out that aspects of quantum mechanics can be derived from the holographic principle, using only a perturbative limit of classical general relativity. In flat space, the covariant entropy bound reduces to the Bekenstein bound. The latter does not contain Newton's constant and cannot operate via gravitational backreaction. Instead, it is protected by--and in this sense, predicts--the Heisenberg uncertainty principle.

  20. Corrugated cover plate for flat plate collector

    DOE Patents [OSTI]

    Hollands, K. G. Terry (Elora, CA); Sibbitt, Bruce (Waterloo, CA)

    1978-01-01

    A flat plate radiant energy collector is providing having a transparent cover. The cover has a V-corrugated shape which reduces the amount of energy reflected by the cover away from the flat plate absorber of the collector.