Powered by Deep Web Technologies
Note: This page contains sample records for the topic "rockies area product" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Rockies Area | Open Energy Information  

Open Energy Info (EERE)

Rockies Area Rockies Area Jump to: navigation, search Contents 1 Clean Energy Clusters in the Rockies Area 1.1 Products and Services in the Rockies Area 1.2 Research and Development Institutions in the Rockies Area 1.3 Networking Organizations in the Rockies Area 1.4 Investors and Financial Organizations in the Rockies Area 1.5 Policy Organizations in the Rockies Area Clean Energy Clusters in the Rockies Area Products and Services in the Rockies Area Loading map... {"format":"googlemaps3","type":"ROADMAP","types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"limit":500,"offset":0,"link":"all","sort":[""],"order":[],"headers":"show","mainlabel":"","intro":"","outro":"","searchlabel":"\u2026

2

Rocky Mountain area petroleum product availability with reduced PADD IV refining capacity  

Science Conference Proceedings (OSTI)

Studies of Rocky Mountain area petroleum product availability with reduced refining capacity in Petroleum Administration for Defense IV (PADD IV, part of the Rocky Mountain area) have been performed with the Oak Ridge National Laboratory Refinery Yield Model, a linear program which has been updated to blend gasolines to satisfy constraints on emissions of nitrogen oxides and winter toxic air pollutants. The studies do not predict refinery closures in PADD IV. Rather, the reduced refining capacities provide an analytical framework for probing the flexibility of petroleum refining and distribution for winter demand conditions in the year 2000. Industry analysts have estimated that, for worst case scenarios, 20 to 35 percent of PADD IV refining capacity could be shut-down as a result of clean air and energy tax legislation. Given these industry projections, the study scenarios provide the following conclusions: The Rocky Mountain area petroleum system would have the capability to satisfy winter product demand with PADD IV refinery capacity shut-downs in the middle of the range of industry projections, but not in the high end of the range of projections. PADD IV crude oil production can be maintained by re-routing crude released from PADD IV refinery demands to satisfy increased crude oil demands in PADDs II (Midwest), III (Gulf Coast), and Washington. Clean Air Act product quality regulations generally do not increase the difficulty of satisfying emissions reduction constraints in the scenarios.

Hadder, G.R.; Chin, S.M.

1994-02-01T23:59:59.000Z

3

Vascular Flora of the Rocky Flats Area, Jefferson County, Colorado...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Vascular Flora of the Rocky Flats Area, Jefferson County, Colorado, USA Vascular Flora of the Rocky Flats Area, Jefferson County, Colorado, USA August 2010 Jody K. Nelson Vascular...

4

DOE's Former Rocky Flats Weapons Production Site to Become National...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Former Rocky Flats Weapons Production Site to Become National Wildlife Refuge DOE's Former Rocky Flats Weapons Production Site to Become National Wildlife Refuge July 12, 2007 -...

5

Rocky Flats, Former Production Workers Screening Projects | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Flats, Former Production Workers Screening Projects Rocky Flats, Former Production Workers Screening Projects Project Name: National Supplemental Screening Program Covered DOE...

6

Rocky Mountain (PADD 4) Product Supplied of Normal Butane ...  

U.S. Energy Information Administration (EIA)

Normal Butane/Butylene Supply and Disposition; Product Supplied for Normal Butane/Butylene ; Rocky Mountain (PADD 4) Product Supplied for Crude Oil ...

7

DOE's Former Rocky Flats Weapons Production Site to Become National  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Former Rocky Flats Weapons Production Site to Become National Former Rocky Flats Weapons Production Site to Become National Wildlife Refuge DOE's Former Rocky Flats Weapons Production Site to Become National Wildlife Refuge July 12, 2007 - 2:54pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced the transfer of nearly 4,000 acres of its former Rocky Flats nuclear weapons production site to the Department of the Interior's (DOI) U.S. Fish and Wildlife Service (FWS) for use as a National Wildlife Refuge. After more than a decade of environmental cleanup work, the transfer creates the Rocky Flats National Wildlife Refuge, 16 miles northwest of Denver, Colorado, and marks completion of the regulatory milestones to transform a formerly contaminated site into an environmental asset. "The Department of Energy's environmental cleanup of the Rocky Flats

8

Rocky Mountain (PADD 4) Refinery and Blender Net Production of ...  

U.S. Energy Information Administration (EIA)

Rocky Mountain (PADD 4) Refinery and Blender Net Production of Normal Butane (Thousand Barrels) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8

9

Rockies flood projects add to production  

Science Conference Proceedings (OSTI)

Nine new polymer waterfloods in the Rockies in the past year shows that tertiary recovery needn't be impeded by a $29/bbl oil price, so long as costs are held to a minimum. The uncertain fate faced by several expensive carbon dioxide pilots - even though recoveries have been or promise to be at or well above predictions - points up the overwhelming importance of keeping costs down.

Gill, D.

1983-09-01T23:59:59.000Z

10

Plutonium contamination in soils in open space and residential areas near Rocky Flats, Colorado  

SciTech Connect

Spatial analysis of the {sup 240}Pu:{sup 239}Pu isotopic ratio of 42 soil samples collected around Rocky Flats Plant near Golden, Colorado, was conducted to assess the effect of Rocky Flats Plant activity on the soil environment. Two probability maps that quantified the uncertainty of the spatial distribution of plutonium isotopic ratios were constructed using the sequential Gaussian simulation technique (sGs). Assuming a plutonium isotopic ratio range of 0.152 {+-} 0.003 to 0.169 {+-} 0.009 is characteristic to global fallout in Colorado, and a mean value of 0.155 is representative for the Rocky Flats Plant area, the main findings of the current work were (1) the areas northwest and southwest of Rocky Flats Plant exhibited a plutonium ratio {ge}0.155, this were minimally impacted by the plant activity; (2) he study area east of Rocky Flats Plant exhibited a plutonium isotopic ratio {le}0.155, which is a definitive indicator of Rocky Flats Plant-derived plutonium; and (3) inventory calculations across the study area exhibited large standard error of estimates. These errors were originated from the high variability in plutonium activity over a small sampling scale and the uncertainty in the global fallout isotopic ratio. Using the mean simulated estimates of plutonium isotopic ratio, coupled with plutonium activity measured at 11 soil pits and additional plutonium information published elsewhere, the plutonium loading on the open space and residential areas amounted to 111.2 GBq, with a standard error of estimate of 50.8 GBq.

Litaor, M.I. [Tel-Hai Rodman Coll., Upper Galilee (Israel). Dept. of Biotechnology and Environmental Sciences

1999-02-01T23:59:59.000Z

11

20th-century variations in area of cirque glaciers and glacierets, Rocky Mountain National Park, Rocky Mountains,  

E-Print Network (OSTI)

, Rocky Mountains, Colorado, USA Matthew J. HOFFMAN,1 Andrew G. FOUNTAIN,2 Jonathan M. ACHUFF3 1 maps and aerial and ground-based photographs for the small cirque glaciers and glacierets of Rocky Mountain National Park in the northern Front Range of Colorado, USA, indicates modest change during the 20

Fountain, Andrew G.

12

Rocky Mountain (PADD 4) Total Crude Oil and Products Imports  

U.S. Energy Information Administration (EIA) Indexed Site

Conventional Gasoline Blend. Comp. Fuel Ethanol (Renewable) Distillate Fuel Oil Distillate F.O., 15 ppm and under Distillate F.O., 15 to 500 ppm Distillate F.O., Greater than 500 ppm Distillate F.O., 501 to 2000 ppm Distillate F.O., Greater than 2000 ppm Kerosene Finished Aviation Gasoline Kerosene-Type Jet Fuel Special Naphthas Residual Fuel Oil Residual F.O., Less than 0.31% Sulfur Residual F.O., 0.31 to 1% Sulfur Residual F.O., Greater than 1% Sulfur Naphtha for Petrochem. Feed. Use Waxes Petroleum Coke Asphalt and Road Oil Lubricants Miscellaneous Products Period/Unit: Monthly-Thousand Barrels Monthly-Thousand Barrels per Day Annual-Thousand Barrels Annual-Thousand Barrels per Day

13

Rocky Mountain (PADD 4) Total Crude Oil and Products Imports  

U.S. Energy Information Administration (EIA) Indexed Site

Conventional Gasoline Blend. Comp. Fuel Ethanol (Renewable) Distillate Fuel Oil Distillate F.O., 15 ppm and under Distillate F.O., 15 to 500 ppm Distillate F.O., Greater than 500 ppm Distillate F.O., 501 to 2000 ppm Distillate F.O., Greater than 2000 ppm Kerosene Finished Aviation Gasoline Kerosene-Type Jet Fuel Special Naphthas Residual Fuel Oil Residual F.O., Less than 0.31% Sulfur Residual F.O., 0.31 to 1% Sulfur Residual F.O., Greater than 1% Sulfur Naphtha for Petrochem. Feed. Use Waxes Petroleum Coke Asphalt and Road Oil Lubricants Miscellaneous Products Period/Unit: Monthly-Thousand Barrels Monthly-Thousand Barrels per Day Annual-Thousand Barrels Annual-Thousand Barrels per Day

14

Integrating Wind into Transmission Planning: The Rocky Mountain Area Transmission Study (RMATS): Preprint  

DOE Green Energy (OSTI)

Plans to expand the western grid are now underway. Bringing power from low-cost remote resources--including wind--to load centers could reduce costs for all consumers. But many paths appear to be already congested. Locational marginal price-based modeling is designed to identify the most cost-effective paths to be upgraded. The ranking of such paths is intended as the start of a process of political and regulatory approvals that are expected to result in the eventual construction of new and upgraded lines. This paper reviews the necessary data and analytical tasks to accurately represent wind in such modeling, and addresses some policy and regulatory issues that can help with wind integration into the grid. Providing wind fair access to the grid also (and more immediately) depends on tariff and regulatory changes. Expansion of the Rocky Mountain Area Transmission Study (RMATS) study scope to address operational issues supports the development of transmission solutions that enable wind to connect and deliver power in the next few years--much sooner than upgrades can be completed.

Hamilton, R.; Lehr, R.; Olsen, D.; Nielsen, J.; Acker, T.; Milligan, M.; Geller, H.

2004-03-01T23:59:59.000Z

15

A multispectral scanner survey of the Rocky Flats Environmental Technology Site and surrounding area, Golden, Colorado  

SciTech Connect

Aerial multispectral scanner imagery was collected of the Rocky Flats Environmental Technology Site in Golden, Colorado, on June 3, 5, 6, and 7, 1994, using a Daedalus AADS1268 multispectral scanner and coincident aerial color and color infrared photography. Flight altitudes were 4,500 feet (1372 meters) above ground level to match prior 1989 survey data; 2,000 feet (609 meters) above ground level for sitewide vegetation mapping; and 1,000 feet (304 meters) above ground level for selected areas of special interest. A multispectral survey was initiated to improve the existing vegetation classification map, to identify seeps and springs, and to generate ARC/INFO Geographic Information System compatible coverages of the vegetation and wetlands for the entire site including the buffer zone. The multispectral scanner imagery and coincident aerial photography were analyzed for the detection, identification, and mapping of vegetation and wetlands. The multispectral scanner data were processed digitally while the color and color infrared photography were manually photo-interpreted to define vegetation and wetlands. Several standard image enhancement techniques were applied to the multispectral scanner data to assist image interpretation. A seep enhancement was applied and a color composite consisting of multispectral scanner channels 11, 7, and 5 (thermal infrared, mid-infrared, and red bands, respectively) proved most useful for detecting seeps, seep zones, and springs. The predawn thermal infrared data were also useful in identifying and locating seeps. The remote sensing data, mapped wetlands, and ancillary Geographic Information System compatible data sets were spatially analyzed for seeps.

Brewster, S.B. Jr.; Brickey, D.W.; Ross, S.L.; Shines, J.E.

1997-04-01T23:59:59.000Z

16

The Department of Energy`s Rocky Flats Plant: A guide to record series useful for health related research. Volume 4: Production and materials handling  

Science Conference Proceedings (OSTI)

This is the fourth in a series of seven volumes which constitute a guide to records of the Rocky Flats Plant useful for conducting health-related research. The primary purpose of Volume 4 is to describe record series pertaining to production and materials handling activities at the Department of Energy`s (DOE) Rocky Flats Plant, now named the Rocky Flats Environmental Technology Site, near Denver, Colorado. History Associates Incorporated (HAI) prepared this guide as part of its work as the support services contractor for DOE`s Epidemiologic Records Inventory Project. This introduction briefly describes the Epidemiologic Records Inventory Project and HAI`s role in the project, provides a history of production and materials handling practices at Rocky Flats, and identifies organizations contributing to production and materials handling policies and activities. Other topics include the scope and arrangement of the guide and the organization to contact for access to these records.

NONE

1995-08-01T23:59:59.000Z

17

Cleanup at Rocky Flats  

NLE Websites -- All DOE Office Websites (Extended Search)

David L. Clark, Los Alamos National Laboratory David L. Clark, Los Alamos National Laboratory The Rocky Flats Environmental Technology Site (RFETS) is an environmental cleanup site located about 16 miles northwest of downtown Denver (Fig 1). Two decades of routine monitoring have shown that the environment around RFETS is contaminated with actinide elements (U, Pu, Am) from site operations, [1] and RFETS has been designated by the U.S. Environmental Protection Agency (EPA) as a Superfund cleanup site. Until December 1989, the Rocky Flats Plant made components for nuclear weapons using various radioactive and hazardous materials, including plutonium, uranium and beryllium. Nearly 40 years of nuclear weapons production left behind a legacy of contaminated facilities, soils, and ground water. More than 2.5 million people live within a 50 mile radius of the site; 300,000 of those live in the Rocky Flats watershed.

18

Drilling in the Rockies  

Science Conference Proceedings (OSTI)

Despite rugged drilling conditions and high drilling costs, rig employment and drilling operations in the Rocky Mountain region of the Overthrust Belt have increased significantly since 1979. Rate of rig employment, well depths, and number of operating companies and contractors in the area are reported. By October 1980, more than 500 active rigs were working in the region, 30% more than were working during the entirety of 1979. (3 photos)

Peacock, D.

1980-12-01T23:59:59.000Z

19

Rocky Mountain (PADD 4) Exports of Normal Butane-Butylene ...  

U.S. Energy Information Administration (EIA)

Normal Butane/Butylene Supply and Disposition; Rocky Mountain (PADD 4) Exports of Crude Oil and Petroleum Products ...

20

ROCKY MOUNTAIN OILFIELD TESTING CENTER PROJECT TEST RESULTS  

NLE Websites -- All DOE Office Websites (Extended Search)

MICROBIAL PRODUCTION STIMULATION MARCH 31, 1998 FC970010 ROCKY MOUNTAIN OILFIELD TESTING CENTER Microbial Production Stimulation for: D. Michael Dennis Geomicrobial Technologies,...

Note: This page contains sample records for the topic "rockies area product" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Microsoft Word - Rockies Pipelines and Prices.doc  

Gasoline and Diesel Fuel Update (EIA)

07 07 1 September 2007 Short-Term Energy Outlook Supplement: Natural Gas in the Rocky Mountains: Developing Infrastructure 1 Highlights * Recent natural gas spot market volatility in the Rocky Mountain States of Colorado, Utah, and Wyoming has been the result of increased production while consumption and pipeline export capacity have remained limited. This Supplement analyzes current natural gas production, pipeline and storage infrastructure in the Rocky Mountains, as well as prospective pipeline projects in these States. * Natural gas reserves in the Rocky Mountain States account for nearly 22 percent of the total natural gas reserves in the United States, and are

22

ROCKY MOUNTAIN OILFIELD TESTING CENTER  

NLE Websites -- All DOE Office Websites (Extended Search)

SAM III PROJECT SAM III PROJECT Sandia National laboratories Prepared for: Project File Documentation Prepared by: MICHAEL J. TAYLOR Project Manager March 31, 1998 JO 850200 : FC 970009 ABSTRACT The Rocky Mountain Oilfield Testing Center (RMOTC) conducted a demonstration of the Surface Area Modulation Downhole Telemetry System (SAM 111) at the Department of Energy's Naval Petroleum Reserve No. 3 (NPR-3), in partnership with Sandia National Laboratories (SNL). The project encompassed the testing of a real-time wireless telemetry system in a simulated Measurement-While-Drilling (MWD) environment. A Surface Area Modulation (SAM) technique demonstrated data transmission rates greater than present techniques, in a deployment mode which requires

23

Rockies | OpenEI  

Open Energy Info (EERE)

Rockies Rockies Dataset Summary Description This dataset comes from the Energy Information Administration (EIA), and is part of the 2011 Annual Energy Outlook Report (AEO2011). This dataset is table 94, and contains only the reference case. The data is broken down into electric power sector, cumulative planned additions,cumulative unplanned additions,cumulative retirements, end-use sector, electricity sales, net energy for load, generation by fuel type and price by service category. Source EIA Date Released April 26th, 2011 (3 years ago) Date Updated Unknown Keywords 2011 AEO EIA Electric Power projections Rockies Data application/vnd.ms-excel icon AEO2011: Electric Power Projections for EMM Region - Western Electricity Coordinating Council / Rockies- Reference Case (xls, 258.8 KiB)

24

Rocky flats teams forming  

SciTech Connect

Bidding teams are shaping up to go after the $3.5-billion, five-year contract to manage ongoing operations and cleanup of the US Dept. of Energy`s Rocky Flats nuclear weapon plant near Denver.

NONE

1994-08-01T23:59:59.000Z

25

Northern Rockies Geothermal Region | Open Energy Information  

Open Energy Info (EERE)

Northern Rockies Geothermal Region Northern Rockies Geothermal Region Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Northern Rockies Geothermal Region Details Areas (0) Power Plants (0) Projects (0) Techniques (0) Map: {{{Name}}} Province is situated in northern Idaho and western Montana and includes folded mountains, fault-bounded uplifts, and volcanics formed during middle Cretaceous to late Eocene mountain period. The region is structtually cojmplex with faulting and folding asociated with eastward thrust faulting. Western Montana and northwestern Wyoming contain large areas of Tertiary volcanic rocks, including smaller localized Quaternary silicic volcanic rocks. Replace Citation[1] References ↑ "Replace Citation" Geothermal Region Data State(s) Idaho, Montana Area 97,538 km²97,538,000,000 m²

26

Rocky Mountain Institute | Open Energy Information  

Open Energy Info (EERE)

Institute Institute Jump to: navigation, search Logo: Rocky Mountain Institute Name Rocky Mountain Institute Address 1820 Folsom Street Place Boulder, Colorado Zip 80302 Region Rockies Area Coordinates 40.01838°, -105.262323° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.01838,"lon":-105.262323,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

27

Clean Economy Network-Rockies | Open Energy Information  

Open Energy Info (EERE)

Network-Rockies Network-Rockies Jump to: navigation, search Name Clean Economy Network-Rockies Place Denver, CO Region Rockies Area Website http://rockies.cleaneconomynet Coordinates 39.7391536°, -104.9847034° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.7391536,"lon":-104.9847034,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

28

Long-Term Surveillance and Maintenance at Rocky Flats: Early Experiences and Lessons Learned  

Science Conference Proceedings (OSTI)

The U.S. Department of Energy's (DOE's) Rocky Flats Site was established in 1951 as part of the United States' nationwide nuclear weapons complex to manufacture nuclear weapons components. In 1992 weapons production halted, and the Rocky Flats mission changed to include environmental investigations, cleanup, and site closure. In October 2005, DOE and its contractor completed an accelerated 10-year, $7 billion cleanup of chemical and radiological contamination left from nearly 50 years of production. The cleanup required the decommissioning, decontamination, demolition, and removal of more than 800 structures; removal of more than 500,000 cubic meters of low-level radioactive waste; and remediation of more than 360 potentially contaminated environmental sites. The final remedy for the site was selected in September 2006 and included institutional controls, physical controls, and continued monitoring for the former industrial portion of the site. The remainder of the site, which served as a buffer zone surrounding the former industrial area, was transferred to the U.S. Fish and Wildlife Service in July 2007 for a national wildlife refuge. DOE's Office of Legacy Management is responsible for the long-term surveillance and maintenance of Rocky Flats, which includes remedy implementation activities and general site maintenance. Several factors have complicated the transition from closure to post-closure at Rocky Flats. The early experiences associated with the two years since the physical cleanup and closure work were completed have led to several valuable lessons learned. (authors)

Surovchak, S. [U.S. Department of Energy, Office of Legacy Management, Westminster, CO (United States); Kaiser, L.; DiSalvo, R.; Boylan, J.; Squibb, G.; Nelson, J.; Darr, B.; Hanson, M. [S.M. Stoller Corporation, Westminster, CO (United States)

2008-07-01T23:59:59.000Z

29

Microsoft Word - RockyFlatsPropLR111406.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 15, 2006 November 15, 2006 REPLY TO ATTN OF: IG-40 SUBJECT: Letter Report on "Alleged Waste of Funds Involving Excess Property at Rocky Flats" (INS-L-07-03) TO: Assistant Secretary for Environmental Management This is to advise you of the results of an Office of Inspector General inspection of alleged waste of funds involving excess property at the Department of Energy's (DOE's) Rocky Flats site. BACKGROUND Nuclear weapons production operations at Rocky Flats were discontinued in 1992. Subsequently, responsibility for Rocky Flats was reassigned from the Department's Office of Defense Programs to the Office of Environmental Management. In January 2000, DOE entered into a contract with Kaiser-Hill Company, LLC, for the closure of Rocky Flats by

30

Revegetation of the Rocky Flats Site | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Revegetation of the Rocky Flats Site Revegetation of the Rocky Flats Site Revegetation of the Rocky Flats, Colorado Site Revegetation of the Rocky Flats Site More Documents &...

31

Former Worker Medical Screening Program - Rocky Flats Former...  

NLE Websites -- All DOE Office Websites (Extended Search)

Rocky Flats Worker Population Served: Production Workers Principal Investigator: Donna Cragle, PhD Toll-free Telephone: (866) 812-6703 Website: http:www.orau.orgnssp This...

32

ROCKY MOUNTAIN OILFIELD TESTING CENTER  

NLE Websites -- All DOE Office Websites (Extended Search)

NOVERFLO (SMART CABLE) NOVERFLO (SMART CABLE) LIQUID LEAK DETECTION SYSTEM FEBRUARY 12, 1996 FC9535/96ET3 RMOTC TEST REPORT NOVERFLO LIQUID LEAK DETECTION SYSTEM (SMART CABLE) Prepared for: INDUSTRY PUBLICATION Prepared by: RALPH SCHULTE RMOTC Project Engineer February 12, 1996 650200/9535:jb CONTENTS Page Summary 1 Introducation 1 NPR-3 Map 2 Description of Operations 3 1 st Test 3 2 nd Test 3 3 rd Test 4 4 th Test 5 Concluding Remarks 5 Acknowledgements 6 Rocky Mountain Oilfield Testing Center Technical Report Noverflo Liquid Leak Detection System (Smart Cable) Summary As part of RMOTC's continuing mission to support and strengthen the domestic oil and gas industry by allowing testing by individual inventors and commercial companies to evaluate their products and technology, RMOTC

33

History of Rocky Flats waste streams  

SciTech Connect

An analysis of the waste streams at Rocky Flats was done to provide information for the Waste Certification program. This program has involved studying the types and amounts of retrievable transuranic (TRU) waste from Rocky Flats that is stored at the Idaho National Engineering Laboratory (INEL). The information can be used to estimate the types and amounts of waste that will need to be permanently stored in the Waste Isolation Pilot Plant (WIPP). The study covered mostly the eight-year period from June 1971 to June 1979. The types, amounts, and plutonium content of TRU waste and the areas or operations responsible for generating the waste are summarized in this waste stream history report. From the period studied, a total of 24,546,153 lbs of waste containing 211,148 g of plutonium currently occupies 709,497 cu ft of storage space at INEL.

Luckett, L.L.; Dickman, A.A.; Wells, C.R.; Vickery, D.J.

1982-03-10T23:59:59.000Z

34

Southern Rockies Geothermal Region | Open Energy Information  

Open Energy Info (EERE)

Southern Rockies Geothermal Region Southern Rockies Geothermal Region Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Southern Rockies Geothermal Region Details Areas (0) Power Plants (0) Projects (0) Techniques (0) Assessment of Moderate- and High-Temperature Geothermal Resources of the United States[1] References ↑ "Assessment of Moderate- and High-Temperature Geothermal Resources of the United States" Geothermal Region Data State(s) Colorado, New Mexico Area 128,454 km²128,454,000,000 m² 49,583.244 mi² 1,382,666,010,600 ft² 153,630,984,000 yd² 31,741,625.67 acres USGS Resource Estimate for this Region Identified Mean Potential 0 MW0 kW 0 W 0 mW 0 GW 0 TW Undiscovered Mean Potential 1,010 MW1,010,000 kW 1,010,000,000 W 1,010,000,000,000 mW 1.01 GW 0.00101 TW Planned Capacity

35

Rocky Mountain Customers  

NLE Websites -- All DOE Office Websites (Extended Search)

RM Home About RM Contact RM Customers Environmental Review-NEPA Operations & Maintenance Planning & Projects Power Marketing Rates Rocky Mountain Region's Customer list Use the filters above the customer list to refine your search. Click the "Clear" to reset the list. Western's full list of customers is available on the Western's Customer Web page. Customer Name Customer Type State Region Project Arapahoe and Roosevelt National Forests Federal Agencies CO RM LAP Arkansas River Power Authority Municipalities CO RM/CRSP LAP/SLIP Burlington, City of Municipalities CO RM LAP Cheyenne Mountain Air Force Base Federal Agencies CO RM LAP Clay Center, City of Municipalities KS RM LAP Denver Water Board Municipalities CO RM LAP

36

Enforcement Letter - Rocky Flats  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2000 1, 2000 Mr. Robert G. Card [ ] Kaiser-Hill Company, L.L.C Rocky Flats Environmental Technology Site 10808 Highway 93, Unit B Golden, CO 80403-8200 Subject: Enforcement Letter Dear Mr. Card: This letter refers to an evaluation by the Department of Energy (DOE) of noncompliance report number NTS-RFO--KHLL-SITEWIDE-2000-0005, which describes noncompliances with the design and procurement requirements of 10 CFR 830.120 (Quality Assurance Rule). 10 CFR 830.120(c)(2)(iii) requires that procured items and services shall meet established requirements and perform as required; 10 CFR 830.120(c)(2)(ii) requires that design work including changes, shall incorporate applicable requirements and design bases; 10 CFR 830.120(c)(2)(iv) requires that inspection and testing of specified items, services, and processes shall be conducted

37

ROCKY MOUNTAIN OILFIELD TESTING CENTER MICROTURBINE PROJECT  

NLE Websites -- All DOE Office Websites (Extended Search)

MICROTURBINE PROJECT MICROTURBINE PROJECT Stacy & Stacy Consulting, LLC March 31, 1998 ROCKY MOUNTAIN OILFIELD TESTING CENTER MICROTURBINE PROJECT Stacy & Stacy Consulting, LLC Prepared for: INDUSTRY PUBLICATION Prepared by: MICHAEL J. TAYLOR Project Manager March 31, 1998 JO 850200 : FC 980009 ABSTRACT The Rocky Mountain Oilfield Testing Center (RMOTC) conducted a demonstration of gas-fired, integrated microturbine systems at the Department of Energy's Naval Petroleum Reserve No. 3 (NPR-3), in partnership with Stacy & Stacy Consulting, LLC (Stacy & Stacy). The project encompassed the testing of two gas microturbine systems at two oil-production wellsites. The microturbine-generators were fueled directly by casinghead gas to power their beam-pumping-unit motors. The system at well 47-A-34 utilized the casinghead sweet gas (0-ppm

38

Smooth Brome Monitoring at Rocky Flats-2005 Results | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Smooth Brome Monitoring at Rocky Flats-2005 Results Smooth Brome Monitoring at Rocky Flats-2005 Results Smooth Brome Monitoring at Rocky Flats-2005 Results Smooth Brome Monitoring...

39

DOE - Office of Legacy Management -- Rocky Flats External Resources  

Office of Legacy Management (LM)

Rocky Flats Stewardship Council Disclaimer Rocky Flats Cold War Museum Disclaimer U.S. Fish and Wildlife Service Rocky Flats National Wildlife Refuge Disclaimer Last Updated: 51...

40

2013 Annual Planning Summary for the Rocky Mountain Oilfield...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rocky Mountain Oilfield Testing Center 2013 Annual Planning Summary for the Rocky Mountain Oilfield Testing Center 2013 Annual Planning Summary for the Rocky Mountain Oilfield...

Note: This page contains sample records for the topic "rockies area product" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

THE U.S. DEPARTMENT OF ENERGYS FACILITY REUSE AT THE ROCKY FLATS ENVIRONMENTALTECHNOLOGY SITE, IG-0425  

Energy.gov (U.S. Department of Energy (DOE))

For several decades, the Rocky Flats Environmental Technology Site (Site) operated as part of the Nation's nuclear weapons production complex. In 1989, however, the Department of Energy (DOE)...

42

Multi-Area Power System Reliability and Production Costing  

Science Conference Proceedings (OSTI)

Multi-area power system operation can reduce costs without jeopardizing service reliability, but the interconnection of systems requires new means for estimating costs and reliability. This report describes methods for evaluating production costs and power system reliability in multi-area power systems.

1990-08-28T23:59:59.000Z

43

Historical Exposures to Chemicals at the Rocky Flats Nuclear Weapons Plant: A Pilot Retrospective Exposure Assessment  

SciTech Connect

In a mortality study of white males who had worked at the Rocky Flats Nuclear Weapons Plant between 1952 and 1979, an increased number of deaths from benign and unspecified intracranial neoplasms was found. A case-control study nested within this cohort investigated the hypothesis that an association existed between brain tumor death and exposure to either internally deposited plutonium or external ionizing radiation. There was no statistically significant association found between estimated radiation exposure from internally deposited plutonium and the development of brain tumors. Exposure by job or work area showed no significant difference between the cohort and the control groups. An update of the study found elevated risk estimates for (1) all lymphopoietic neoplasms, and (2) all causes of death in employees with body burdens greater than or equal to two nanocuries of plutonium. There was an excess of brain tumors for the entire cohort. Similar cohort studies conducted on worker populations from other plutonium handling facilities have not yet shown any elevated risks for brain tumors. Historically, the Rocky Flats Nuclear Weapons Plant used large quantities of chemicals in their production operations. The use of solvents, particularly carbon tetrachloride, was unique to Rocky Flats. No investigation of the possible confounding effects of chemical exposures was done in the initial studies. The objectives of the present study are to (1) investigate the history of chemical use at the Rocky Flats facility; (2) locate and analyze chemical monitoring information in order to assess employee exposure to the chemicals that were used in the highest volume; and (3) determine the feasibility of establishing a chemical exposure assessment model that could be used in future epidemiology studies.

Janeen Denise Robertson

1999-02-01T23:59:59.000Z

44

Benchmarking and Performance Improvement at Rocky Flats Environmental Technology Site  

Science Conference Proceedings (OSTI)

The Rocky Flats Environmental Technology Site (RFETS) has initiated a major work process improvement campaign using the tools of formalized benchmarking and streamlining. This paper provides insights into some of the process improvement activities performed at Rocky Flats from November 1995 through December 1996. It reviews the background, motivation, methodology, results, and lessons learned from this ongoing effort. The paper also presents important gains realized through process analysis and improvement including significant cost savings, productivity improvements, and an enhanced understanding of site work processes.

Elliott, C. [Kaiser-Hill Co., LLC, Golden, CO (United States)], Doyle, D. [USDOE Rocky Flats Office, Golden, CO (United States)], Featherman, W.D. [Project Performance Corp., Sterline, VA (United States)

1997-12-31T23:59:59.000Z

45

Natural Gas in the Rocky Mountains: Developing Infrastructure  

Reports and Publications (EIA)

This Supplement to EIA's Short-Term Energy Outlook analyzes current natural gas production, pipeline and storage infrastructure in the Rocky Mountains, as well as prospective pipeline projects in these States. The influence of these factors on regional prices and price volatility is examined.

Information Center

2007-09-20T23:59:59.000Z

46

DOE - Office of Legacy Management -- Rocky  

Office of Legacy Management (LM)

Rocky Flats Site, Colorado Rocky Flats Site, Colorado A CERCLA and/or RCRA Site rkyflats_2011 Remediation at the Rocky Flats Site was conducted in accordance with Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and/or Resource Conservation and Recovery Act (RCRA) regulations. The site transferred to the Office of Legacy Management in 2008 and requires operation and maintenance of remedial action systems, routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the Rocky Flats site, view the fact sheet. Site History Site Documents Community Involvement Contact Us Rocky Flats Benefits Administration Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Administrative Record Database

47

DOE Certifies Rocky Flats Cleanup "Complete" | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Certifies Rocky Flats Cleanup "Complete" Certifies Rocky Flats Cleanup "Complete" DOE Certifies Rocky Flats Cleanup "Complete" December 8, 2005 - 4:45pm Addthis Golden, CO - Deputy Secretary of Energy Clay Sell announced today that the environmental cleanup of the former Rocky Flats site has been certified complete by the U.S. Department of Energy. Certification marks the final step in the DOE's successful effort to clean up and eventually turn over the former weapons production site for use as a National Wildlife Refuge. "With today's announcement, the cleanup chapter of Rocky Flats' history is closed, while another equally important chapter is just being opened," said Deputy Secretary Sell. "This successful cleanup represents a triumph of determination and spirit of cooperation that stands as an example for

48

Secular Fluctuations of Temperature in the Rocky Mountain States and a Comparison with Precipitation Fluctuations  

Science Conference Proceedings (OSTI)

Fluctuations of temperature in the Rocky Mountain states of Idaho, Montana, Wyoming, Colorado and Utah are analyzed for the period 18911978. Prior to 1891, data for this area are too sparse to make meaningful generalizations. After screening ...

Raymond S. Bradley

1980-07-01T23:59:59.000Z

49

ROMPEXThe Rocky Mountain Peaks Experiment of 1985: Preliminary Assessment  

Science Conference Proceedings (OSTI)

During the late summer of 1985 a field experiment was conducted to investigate mountaintop winds over a broad area of the Rocky Mountains extending from south central Wyoming through northern New Mexico. The principal motivation for this ...

Elmar R. Reiter; John D. Sheaffer; James E. Bossert; Richard C. Fleming; William E. Clements; J. T. Lee; Sumner Barr; John A. Archuleta; Donald E. Hoard

1987-04-01T23:59:59.000Z

50

Immobilization of Rocky Flats Graphite Fines Residues  

SciTech Connect

The Savannah River Technology Center (SRTC) is developing an immobilization process for graphite fines residues generated during nuclear materials production activities at the Rocky Flats Environmental Technology Site (Rocky Flats). The continued storage of this material has been identified as an item of concern. The residue was generated during the cleaning of graphite casting molds and potentially contains reactive plutonium metal. The average residue composition is 73 wt percent graphite, 15 wt percent calcium fluoride (CaF2), and 12 wt percent plutonium oxide (PuO2). Approximately 950 kilograms of this material are currently stored at Rocky Flats. The strategy of the immobilization process is to microencapsulate the residue by mixing with a sodium borosilicate (NBS) glass frit and heating at nominally 700 degrees C. The resulting waste form would be sent to the Waste Isolation Pilot Plant (WIPP) for disposal. Since the PuO2 concentration in the residue averages 12 wt percent, the immobilization process was required to meet the intent of safeguards termination criteria by limiting plutonium recoverability based on a test developed by Rocky Flats. The test required a plutonium recovery of less than 4 g/kg of waste form when a sample was leached using a nitric acid/CaF2 dissolution flowsheet. Immobilization experiments were performed using simulated graphite fines with cerium oxide (CeO2) as a surrogate for PuO2 and with actual graphite fines residues. Small-scale surrogate experiments demonstrated that a 4:1 frit to residue ratio was adequate to prevent recovery of greater than 4 g/kg of cerium from simulated waste forms. Additional experiments investigated the impact of varying concentrations of CaF2 and the temperature/heating time cycle on the cerium recovery. Optimal processing conditions developed during these experiments were subsequently demonstrated at full-scale with surrogate materials and on a smaller scale using actual graphite fines.In general, the recovery of cerium from the full-scale waste forms was higher than for smaller scale experiments. The presence of CaF2 also caused a dramatic increase in cerium recovery not seen in the small-scale experiments. However, the results from experiments with actual graphite fines were encouraging. A 4:1 frit to residue ratio, a temperature of 700 degrees C, and a 2 hr heating time produced waste forms with plutonium recoveries of 4 plus/minus 1 g/kg. With an increase in the frit to residue ratio, waste forms fabricated at this scale should meet the Rocky Flats product specification. The scale-up of the waste form fabrication process to nominally 3 kg is expected to require a 5:1 to 6:1 frit to residue ratio and maintaining the waste form centerline temperature at 700 degrees C for 2 hr.

Rudisill, T. S.

1998-11-06T23:59:59.000Z

51

ROCKY MOUNTAIN OILFIELD TESTING CENTER  

NLE Websites -- All DOE Office Websites (Extended Search)

ALLIED OIL & TOOL POWERJET SLOTTING TOOL ALLIED OIL & TOOL POWERJET SLOTTING TOOL JANUARY 10, 1996 FC9522 / 95DT3 ROCKY MOUNTAIN OILFIELD TESTING CENTER PROJECT TEST RESULTS ALLIED OIL & TOOL POWERJET SLOTTING TOOL Prepared for: INDUSTRY PUBLICATION Prepared by: RALPH SCHULTE RMOTC Project Engineer January 11, 1996 551103/9522:jb CONTENTS Page Summary .......................................................................................................................2 Introduction.....................................................................................................................2 Description of Operations...................................................................................................3 Figure 1 ..........................................................................................................5

52

Total Crude Oil and Petroleum Products Imports by Processing Area  

Gasoline and Diesel Fuel Update (EIA)

Product: Total Crude Oil and Petroleum Products Crude Oil Total Products Other Liquids Unfinished Oils Naphthas and Lighter Kerosene and Light Gas Oils Heavy Gas Oils Residuum Period-Unit: Monthly-Thousand Barrels Monthly-Thousand Barrels per Day Annual-Thousand Barrels Annual-Thousand Barrels per Day Product: Total Crude Oil and Petroleum Products Crude Oil Total Products Other Liquids Unfinished Oils Naphthas and Lighter Kerosene and Light Gas Oils Heavy Gas Oils Residuum Period-Unit: Monthly-Thousand Barrels Monthly-Thousand Barrels per Day Annual-Thousand Barrels Annual-Thousand Barrels per Day Download Series History Download Series History Definitions, Sources & Notes Definitions, Sources & Notes Show Data By: Product Area Apr-13 May-13 Jun-13 Jul-13 Aug-13 Sep-13 View History East Coast (PADD 1) 62,196 60,122 54,018 52,671 54,668 52,999 1981-2013 Midwest (PADD 2) 54,439 53,849 53,638 60,984 63,482 56,972 1981-2013 Gulf Coast (PADD 3) 141,142 150,846 138,204 149,059 141,421 138,656 1981-2013

53

Sustainability Center of the Rockies | Open Energy Information  

Open Energy Info (EERE)

Sustainability Center of the Rockies Sustainability Center of the Rockies Jump to: navigation, search Name Sustainability Center of the Rockies Address Post Office Box 2020 Place Carbondale, Colorado Zip 81623 Region Rockies Area Notes Mission is to transform the Roaring Fork Valley's built environment into a model of resource-efficient living Website http://www.scor1.org/ Coordinates 39.397478°, -107.216685° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.397478,"lon":-107.216685,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

54

Rocky Mountain Basins Produced Water Database  

DOE Data Explorer (OSTI)

Historical records for produced water data were collected from multiple sources, including Amoco, British Petroleum, Anadarko Petroleum Corporation, United States Geological Survey (USGS), Wyoming Oil and Gas Commission (WOGC), Denver Earth Resources Library (DERL), Bill Barrett Corporation, Stone Energy, and other operators. In addition, 86 new samples were collected during the summers of 2003 and 2004 from the following areas: Waltman-Cave Gulch, Pinedale, Tablerock and Wild Rose. Samples were tested for standard seven component "Stiff analyses", and strontium and oxygen isotopes. 16,035 analyses were winnowed to 8028 unique records for 3276 wells after a data screening process was completed. [Copied from the Readme document in the zipped file available at http://www.netl.doe.gov/technologies/oil-gas/Software/database.html] Save the Zipped file to your PC. When opened, it will contain four versions of the database: ACCESS, EXCEL, DBF, and CSV formats. The information consists of detailed water analyses from basins in the Rocky Mountain region.

55

Rocky Flats Closure Unit Cost Data  

SciTech Connect

The Rocky Flats Closure Project has completed the process of stabilizing residual nuclear materials, decommissioning nuclear facilities, remediating environmental media and closing the Rocky Flats Site (Site). The project cost approximately $4.1 B and included the decommissioning of over 700 structures including 5 major plutonium facilities and 5 major uranium facilities, shipping over 14,600 cubic meters of transuranic and 565,000 cubic meters of low level radioactive waste, and remediating a 385-acre industrial area and the surrounding land. Actual costs were collected for a large variety of closure activities. These costs can be correlated with metrics associated with the facilities and environmental media to capture cost factors from the project that could be applicable to a variety of other closure projects both within and outside of the Department of Energy's weapons complex. The paper covers four general topics: the process to correlate the actual costs and metrics, an example of the correlated data for one large sub-project, a discussion of the results, and the additional activities that are planned to correlate and make this data available to the public. The process to collect and arrange the project control data of the Closure Project relied on the actual Closure Project cost information. It was used to correlate these actual costs with the metrics for the physical work, such as building area or waste generated, to support the development of parametric cost factors. The example provides cost factors for the Industrial Sites Project. The discussion addresses the strengths and weaknesses of the data, followed by a section identifying future activities to improve and extend the analyses and integrate it within the Department's Environmental Cost Analysis System. (authors)

Sanford, P.C. [1129 Business Parkway South, Westminister, MD (United States); Skokan, B. [United States Department of Energy, Washington, DC (United States)

2007-07-01T23:59:59.000Z

56

Site wide integration of the Rocky Flats closure project  

Science Conference Proceedings (OSTI)

The prime contractor for the Rocky Flats Closure Project (RFCP), Kaiser-Hill, in concert with the Department of Energy--Rocky Flats Field Office (DOE-RFFO) has applied a fully integrated, life-cycle, critical path schedule and work planning system to manage the work that is required to close the Site. The closure of the Site is complex, in that it houses over 700 facilities, 19,600 kilograms of Special Nuclear Material (Plutonium and Uranium), and over 160,000 cubic meters of Transuranic, Low Level, and Hazardous Waste. The deactivation, decommissioning, decontaminating, and demolition of this large number of facilities, while at the same time accommodating difficult on-going activities, significantly increases the sophistication required in the planning process. The Rocky Flats team has overcome these difficulties by establishing a money oriented critical path process, to provide a least-cost avenue to supporting on-going activities and a line-of-balance process for production oriented activities. These processes, when integrated with a typical activity-based project planning system, guide the way to the shortest and most cost-effective course for the closure of the Rocky Flats Site.

Burdge, L.F.; Golan, P.

1998-06-01T23:59:59.000Z

57

Rocky Flats resumes shipments to WIPP  

NLE Websites -- All DOE Office Websites (Extended Search)

of Energy (DOE) has resumed transuranic radioactive waste shipments from DOE's Rocky Flats Environmental Technology Site (RFETS) to the Waste Isolation Pilot Plant (WIPP). A...

58

DOE - Office of Legacy Management -- Rocky  

NLE Websites -- All DOE Office Websites (Extended Search)

A CERCLA andor RCRA Site rkyflats2011 Remediation at the Rocky Flats Site was conducted in accordance with Comprehensive Environmental Response, Compensation, and Liability Act...

59

Rocky Mountain Humane Investing | Open Energy Information  

Open Energy Info (EERE)

Humane Investing Humane Investing Jump to: navigation, search Name Rocky Mountain Humane Investing Place Allenspark, Colorado Zip 80510 Product Allenspark-based investment management firm prioritising Socially Responsible Investing (SRI). Coordinates 40.19472°, -105.525719° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.19472,"lon":-105.525719,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

60

Photo of the Week: Rocky Flats Wildlife Refuge | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rocky Flats Wildlife Refuge Photo of the Week: Rocky Flats Wildlife Refuge December 21, 2012 - 11:27am Addthis The Rocky Flats Plant was first established in 1951 as a nuclear...

Note: This page contains sample records for the topic "rockies area product" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Landfill Cover Revegetation at the Rocky Flats Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Landfill Cover Revegetation at the Rocky Flats Environmental Technology Site Landfill Cover Revegetation at the Rocky Flats Environmental Technology Site Landfill Cover...

62

Preliminary Notice of Violation , Rocky Flats Environmental Technology...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Violation , Rocky Flats Environmental Technology Site - EA-96-05 Preliminary Notice of Violation , Rocky Flats Environmental Technology Site - EA-96-05 October 7, 1996 Preliminary...

63

Audit of the Contractor Incentive Programs at the Rocky Flats...  

NLE Websites -- All DOE Office Websites (Extended Search)

at the Rocky Flats Environmental Technology Site, IG-0411 Audit of the Contractor Incentive Programs at the Rocky Flats Environmental Technology Site, IG-0411 Report on "Audit...

64

Long-Term Surveillance and Maintenance at Rocky Flats: Early...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

at Rocky Flats: Early Experiences and Lessons Learned Long-Term Surveillance and Maintenance at Rocky Flats: Early Experiences and Lessons Learned Long-Term Surveillance and...

65

EA-1146: Radioactive Waste Storage at Rocky Flats Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

46: Radioactive Waste Storage at Rocky Flats Environmental Technology Site, Golden, Colorado EA-1146: Radioactive Waste Storage at Rocky Flats Environmental Technology Site,...

66

LM Records Handling System (LMRHS01) - Rocky Flats Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

here Home LM Records Handling System (LMRHS01) - Rocky Flats Environmental Records Database, Office of Legacy Management LM Records Handling System (LMRHS01) - Rocky Flats...

67

ROCKY MOUNTAIN OILFIELD TESTING CENTER PROJECT TEST RESULTS  

NLE Websites -- All DOE Office Websites (Extended Search)

PERMANENT DOWNHOLE PRESSURE GAUGE PERMANENT DOWNHOLE PRESSURE GAUGE MARCH 15, 1998 FC9553/96PT16 ROCKY MOUNTAIN OILFIELD TESTING CENTER Sperry-Sun Permanent Downhole Pressure Gauge PROJECT TEST RESULTS March 16, 1998 Michael R. Tyler Project Manager Abstract The Sperry-Sun Downhole Permanent Pressure Gauge (DPPG) is a pressure gauge that is designed to remain in the well for long periods of time providing real time surface data on borehole pressures. The DPPG was field tested at the Rocky Mountain Oilfield Testing Center in well 63-TPX-10. The instrument was attached to the production string directly above a submersible pump. It was expected to monitor pressure draw-down and build-ups during normal production cycles. During the first two months of the test, the tool worked fine providing a pressure up survey that

68

Facility overview for commercial application of selected Rocky Flats facilities  

SciTech Connect

The purpose of this Facility Overview is to support the Rocky Flats Local Impacts Initiative`s Request for Interest, to solicit interest from commercial corporations for utilizing buildings 865 and 883, and the equipment contained within each building, for a commercial venture. In the following sections, this document describes the Rocky Flats Site, the buildings available for lease, the equipment within these buildings, the site services available to a tenant, the human resources available to support operations in buildings 865 and 883, and the environmental condition of the buildings and property. In addition, a brief description is provided of the work performed to date to explore the potential products that might be manufactured in Buildings 865 and 883, and the markets for these products.

NONE

1996-11-01T23:59:59.000Z

69

Closing Rocky Flats by 2006  

Science Conference Proceedings (OSTI)

Safely accelerating the closure of Rocky Flats to 2006 is a goal shared by many: the State of Colorado, the communities surrounding the site, the U.S. Congress, the Department of Energy, Kaiser-Hill and its team of subcontractors, the site's employees, and taxpayers across the country. On June 30, 2000, Kaiser-Hill (KH) submitted to the Department of Energy (DOE), KH's plan to achieve closure of Rocky Flats by December 15, 2006, for a remaining cost of $3.96 billion (February 1, 2000, to December 15, 2006). The Closure Project Baseline (CPB) is the detailed project plan for accomplishing this ambitious closure goal. This paper will provide a status report on the progress being made toward the closure goal. This paper will: provide a summary of the closure contract completion criteria; give the current cost and schedule variance of the project and the status of key activities; detail important accomplishments of the past year; and discuss the challenges ahead.

Tuor, N. R.; Schubert, A. L.

2002-02-26T23:59:59.000Z

70

ROCKY MOUNTAIN OILFIELD TESTING CENTER PROJECT TEST RESULTS  

NLE Websites -- All DOE Office Websites (Extended Search)

D-JAX PUMP-OFF CONTROLLER D-JAX PUMP-OFF CONTROLLER APRIL 4,1995 FC9510 / 95PT4 ROCKY MOUNTAIN OILFIELD TESTING CENTER D-JAX PUMP-OFF CONTROLLER PROJECT TEST RESULTES Prepared for: Industry Publication Prepared by: MICHAEL R. TYLER RMOTC Field Engineer April 4, 1995 55103/9510:jb CONTENTS Page Introduction........................................................................................1 NPR-3 Map........................................................................................2 Benefits of D-JAX Pump-Off Controller.....................................................3 Test Results.......................................................................................3 Production Information..........................................................................4

71

City of Rocky Mount, North Carolina (Utility Company) | Open Energy  

Open Energy Info (EERE)

Mount, North Carolina (Utility Company) Mount, North Carolina (Utility Company) Jump to: navigation, search Name City of Rocky Mount Place North Carolina Utility Id 16226 Utility Location Yes Ownership M NERC Location SERC NERC SERC Yes ISO Other Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Area Lighting - 1000W MH Lighting Area Lighting - 1000W MV Lighting Area Lighting - 100W MH Lighting Area Lighting - 100W MH (SE) Lighting Area Lighting - 100W SV Lighting Area Lighting - 100W SV (SE) Lighting Area Lighting - 1500W MH Lighting Area Lighting - 150W SV Lighting Area Lighting - 175W MH Lighting

72

Concept Study: Exploration and Production in Environmentally Sensitive Arctic Areas  

Science Conference Proceedings (OSTI)

The Alaska North Slope offers one of the best prospects for increasing U.S. domestic oil and gas production. However, this region faces some of the greatest environmental and logistical challenges to oil and gas production in the world. A number of studies have shown that weather patterns in this region are warming, and the number of days the tundra surface is adequately frozen for tundra travel each year has declined. Operators are not allowed to explore in undeveloped areas until the tundra is sufficiently frozen and adequate snow cover is present. Spring breakup then forces rapid evacuation of the area prior to snowmelt. Using the best available methods, exploration in remote arctic areas can take up to three years to identify a commercial discovery, and then years to build the infrastructure to develop and produce. This makes new exploration costly. It also increases the costs of maintaining field infrastructure, pipeline inspections, and environmental restoration efforts. New technologies are needed, or oil and gas resources may never be developed outside limited exploration stepouts from existing infrastructure. Industry has identified certain low-impact technologies suitable for operations, and has made improvements to reduce the footprint and impact on the environment. Additional improvements are needed for exploration and economic field development and end-of-field restoration. One operator-Anadarko Petroleum Corporation-built a prototype platform for drilling wells in the Arctic that is elevated, modular, and mobile. The system was tested while drilling one of the first hydrate exploration wells in Alaska during 2003-2004. This technology was identified as a potentially enabling technology by the ongoing Joint Industry Program (JIP) Environmentally Friendly Drilling (EFD) program. The EFD is headed by Texas A&M University and the Houston Advanced Research Center (HARC), and is co-funded by the National Energy Technology Laboratory (NETL). The EFD participants believe that the platform concept could have far-reaching applications in the Arctic as a drilling and production platform, as originally intended, and as a possible staging area. The overall objective of this project was to document various potential applications, locations, and conceptual designs for the inland platform serving oil and gas operations on the Alaska North Slope. The University of Alaska Fairbanks assisted the HARC/TerraPlatforms team with the characterization of potential resource areas, geotechnical conditions associated with continuous permafrost terrain, and the potential end-user evaluation process. The team discussed the various potential applications with industry, governmental agencies, and environmental organizations. The benefits and concerns associated with industry's use of the technology were identified. In this discussion process, meetings were held with five operating companies (22 people), including asset team leaders, drilling managers, HSE managers, and production and completion managers. Three other operating companies and two service companies were contacted by phone to discuss the project. A questionnaire was distributed and responses were provided, which will be included in the report. Meetings were also held with State of Alaska Department of Natural Resources officials and U.S. Bureau of Land Management regulators. The companies met with included ConcoPhillips, Chevron, Pioneer Natural Resources, Fairweather E&P, BP America, and the Alaska Oil and Gas Association.

Shirish Patil; Rich Haut; Tom Williams; Yuri Shur; Mikhail Kanevskiy; Cathy Hanks; Michael Lilly

2008-12-31T23:59:59.000Z

73

ROCKY MOUNTAIN OILFIELD TESTING CENTER  

NLE Websites -- All DOE Office Websites (Extended Search)

AUTOMATIC SHUTDOWN VALVE AUTOMATIC SHUTDOWN VALVE CAMBRIA VALVE CORPORATION OCTOBER 17, 1995 FC9536/95ET1 RMOTC TEST REPORT Automatic Shutdown Valve Cambria Valve Corporation Prepared for: INDUSTRY PUBLICATION Prepared by: MICHAEL J. TAYLOR RMOTC Project Manager October 17, 1995 551103/9536:jb TABLE OF CONTENTS Page Introduction 1 Figure 1 2 Test Details 3 Table 1 4 Conclusions 5 Acknowledgments 5 ABSTRACT The Rocky Mountain Oilfield Testing Center (RMOTC) conducted a test of an Automatic Shutdown Valve (ASDV) for hydraulic systems at the Naval Petroleum Reserve No. 3 (NPR- 3). The Cambria Valve Corporation (CVC) manufactures the 3-Port ASDV that is designed to automatically shut down the flow of fluid through a hydraulic system in the event of a ruptured line and safely redirect flow to a bypass system. The CVC ASDV effectively demonstrated its

74

ROCKY MOUNTAIN OILFIELD TESTING CENTER  

NLE Websites -- All DOE Office Websites (Extended Search)

AUTOMATED THREE-PHASE CENTRIFUGE PROJECT AUTOMATED THREE-PHASE CENTRIFUGE PROJECT MARCH 30, 1998 FC9535/96ET5 RMOTC TEST REPORT AUTOMATED THREE-PHASE CENTRIFUGE PROJECT Centech, Inc. Prepared for: INDUSTRY PUBLICATION Prepared by: MICHAEL J. TAYLOR Project Manager March 30, 1998 850200/650200/650201:9583 ABSTRACT The Rocky Mountain Oilfield Testing Center (RMOTC) conducted a test of an Automated ThreePhase Centrifuge at the Department of Energy's Naval Petroleum Reserve No. 3 (NPR-3). Centech, Inc. has manufactured a three-phase centrifuge which has been retrofitted with a PCbased, fuzzy-logic, automated control system, by Los Alamos National Laboratory. The equipment is designed to automatically process tank-bottom wastes within operator-prescribed limits of Basic

75

Weekly Rocky Mountains (PADD 4) Operable Crude Oil Distillation ...  

U.S. Energy Information Administration (EIA)

Weekly Rocky Mountains (PADD 4) Operable Crude Oil Distillation Capacity (Thousand Barrels per Calendar Day)

76

Rocky Flats ash test procedure (sludge stabilization)  

SciTech Connect

Rocky Flats Ash items have been identified as the next set of materials to be stabilized. This test is being run to determine charge sizes and soak times to completely stabilize the Rocky Flats Ash items. The information gathered will be used to generate the heating rampup cycle for stabilization. This test will also gain information on the effects of the glovebox atmosphere (moisture) on the stabilized material. This document provides instructions for testing Rocky Flats Ash in the HC-21C muffle furnace process.

Winstead, M.L.

1995-09-14T23:59:59.000Z

77

REVEGETATION OF THE ROCKY FLATS SITE, COLORADO  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REVEGETATION OF THE ROCKY FLATS SITE, COLORADO REVEGETATION OF THE ROCKY FLATS SITE, COLORADO Jody K. Nelson Professional Environmental Group/S.M. Stoller Corporation Rocky Flats Site 11025 Dover Street, Suite 1000 Westminster, CO 80021 ABSTRACT At the U.S. Department of Energy's (DOE's) Rocky Flats Site (Site), a former nuclear weapons component manufacturing plant near Golden, Colorado, approximately 650 acres were revegetated as part of the cleanup and closure activities. Numerous issues and challenges were addressed during the revegetation activities at the Site. These included deciding on revegetation and restoration goals; addressing poor substrate issues and soil compaction problems; use of soil amendments and topsoil; seed selection issues; timing and location of revegetation projects

78

Best of the Canadian RoCkies  

E-Print Network (OSTI)

to beautiful Moraine Lake; the crystal-clear lake is nestled in the Valley of the Ten Peaks. Return to your adventure on the Athabasca River led by Rocky Mountain River Guides; and a trip on the Jasper Tramway

Connor, Ed

79

Production system improvement : floor area reduction and inventory optimization  

E-Print Network (OSTI)

This thesis shows improvements of a medical device production system. The demand at the Medical Device Manufacturing Company (MDMC) is low for the occlusion system product and there is a need to introduce other production ...

Yang, Tianying, M. Eng. Massachusetts Institute of Technology

2012-01-01T23:59:59.000Z

80

Erosion of rocky carbonate coastlines: Andros Island, Bahamas  

SciTech Connect

Erosion of rocky carbonate coastlines has been monitored at intertidal and supratidal locations on Andros Island, Bahamas. The monitoring method involves periodic direct measurement of over 1000 points on a 0.25 square meter surface of rock. Comparisons are made between initial surface morphology and subsequent surface morphologies in order to measure rates and patterns of erosion. Rates of intertidal erosion vary from 2.5 meters/1000 years to 5.0 meters/1000 years, with an average of 3.1 meters/1000 years. The lack of wave action, combined with an absence of bioeroding organisms such as gastropods, chitons, sponges, worms and barnacles, which exist in the intertidal zone, causes the supratidal rate of erosion to be much lower than the rate of intertidal erosion. Degradation of rocky coastlines results in island retreat as well as the production of a large amount of sediment which is deposited in adjacent lagoons. Much of the sediment produced by bioerosion of these peloidal limestones exists as fecal pellets and sponge chips which are calcite. The erosion of rocky intertidal escarpments creates terraces and notches which lie near low-tide level. The width of the intertidal terraces of Andros Island aids our understanding of the duration of the most recent stillstand of sea level. Terraces and notches at other elevations indicate former stillstands.

Donn, T.F.; Boardman, M.R.

1985-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "rockies area product" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

ROCKY MOUNTAIN OILFIELD TESTING CENTER  

NLE Websites -- All DOE Office Websites (Extended Search)

MECHANICAL SLIMHOLE TESTING SYSTEM (MSTS) MECHANICAL SLIMHOLE TESTING SYSTEM (MSTS) SLIMHOLE DRILL STEM TESTER APRIL, 1995 FC9524/95DT4 MSTS Test in Casper Wyoming April 19,1995 Background MSTS EXP-2 was shipped back to SPT for modifications and re-testing. A 4-1/2" cased well at the Rocky Mountain Oilfield Testing Center (RMOTC) in Casper Wyoming was selected. The well conditions were: Casper Well Deviation 0 Casing 4-1/2" 10.5#/ft Test depth 5380 ft BHT NOT Tubing 2-3/8" 4.7#/ft Formation Fluid Water & Oil Kill Fluid 10#/gal brine The MSTS was tested with a single 3.06" Dowell packer which was set at 5380 ft, approximately 80 off bottom. The test string was configured: MSTS EXP-2 with Inflate recorder - HPR-D Formation Gage - HPR-D Single packer, Dowell 3.06 TFV - 12 inch stroke no cam 900 ft of 2-3/8" 4.7 #/ft tubing (3000 #)

82

Production system improvement : floor area reduction and visual management  

E-Print Network (OSTI)

This thesis suggests on the development process of a new layout design and visual management tools to improve the efficiency of a production line in a medical device company. Lean production philosophy and common lean ...

Chen, Zhuling, M. Eng. Massachusetts Institute of Technology

2012-01-01T23:59:59.000Z

83

TMS 2013: Technical Area - Materials Processing and Production  

Science Conference Proceedings (OSTI)

MATERIALS PROCESSING AND PRODUCTION. Abstract submission for the TMS 2013 Annual Meeting is now closed. PLANNED SYMPOSIA - Place your...

84

NETL: ICCS Area 1 - Air Products and Chemicals, Inc  

NLE Websites -- All DOE Office Websites (Extended Search)

Air Products and Chemicals, Inc. - Industrial Carbon Capture and Sequestration Air Products and Chemicals, Inc. - Industrial Carbon Capture and Sequestration Air Products and Chemicals, Inc.: Demonstration of CO2 Capture and Sequestration of Steam Methane Reforming Process Gas Used for Large-Scale Hydrogen Production Allentown, Pennsylvania PROJECT FACT SHEET Air Products and Chemicals, Inc.: Demonstration of CO2 Capture and Sequestration of Steam Methane Reforming Process Gas Used for Large-Scale Hydrogen Production [PDF-1.6MB] (Oct 2012) ENVIRONMENTAL REPORTS APCI Environmental Assessment [PDF-30MB] FONSI Finding of no significant impact [PDF-257KB] CONSTRUCTION PHOTOS [PDF-572.9KB] PROGRAM PUBLICATIONS Information to come. PAPERS AND PRESENTATIONS Demonstration of Carbon Capture and Sequestration of Steam Methane Reforming Process Gas Used for Large-Scale Hydrogen Production or "Port Arthur CCUS" [PDF-1.13MB] (May 2013)

85

Cholesterol and Phytosterol Oxidation ProductsChapter 17 Biological Effects of Phytosterol Oxidation Products, Future Research Areas and Concluding Remarks  

Science Conference Proceedings (OSTI)

Cholesterol and Phytosterol Oxidation Products Chapter 17 Biological Effects of Phytosterol Oxidation Products, Future Research Areas and Concluding Remarks Food Science Health Nutrition Biochemistry eChapters Food Science & Technology

86

Rocky Flats Compliance Program; Technology summary  

SciTech Connect

The Department of Energy (DOE) established the Office of Technology Development (EM-50) (OTD) as an element of Environmental Restoration and Waste Management (EM) in November 1989. The primary objective of the Office of Technology Development, Rocky Flats Compliance Program (RFCP), is to develop altemative treatment technologies for mixed low-level waste (wastes containing both hazardous and radioactive components) to use in bringing the Rocky Flats Plant (RFP) into compliance with Federal and state regulations and agreements. Approximately 48,000 cubic feet of untreated low-level mixed waste, for which treatment has not been specified, are stored at the RFP. The cleanup of the Rocky Flats site is driven by agreements between DOE, the Environmental Protection Agency (EPA), and the Colorado Department of Health (CDH). Under these agreements, a Comprehensive Treatment and Management Plan (CTMP) was drafted to outline the mechanisms by which RFP will achieve compliance with the regulations and agreements. This document describes DOE`s strategy to treat low-level mixed waste to meet Land Disposal Restrictions and sets specific milestones related to the regulatory aspects of technology development. These milestones detail schedules for the development of technologies to treat all of the mixed wastes at the RFP. Under the Federal Facilities Compliance Act (FFCA), the CTMP has been incorporated into Rocky Flats Plant Conceptual Site Treatment Plan (CSTP). The CSTP will become the Rocky Flats Plant site Treatment Plan in 1995 and will supersede the CTMP.

NONE

1994-02-01T23:59:59.000Z

87

Rocky Ridge I | Open Energy Information  

Open Energy Info (EERE)

I I Jump to: navigation, search Name Rocky Ridge I Facility Rocky Ridge I Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Enel Green Power North America / TradeWind Energy Developer TradeWind Energy Energy Purchaser Western Farmers Electric Cooperative Location Rocky OK Coordinates 35.055821°, -98.838426° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.055821,"lon":-98.838426,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

88

DOE - Office of Legacy Management -- Rocky Flats Regulatory Documents  

NLE Websites -- All DOE Office Websites (Extended Search)

Regulatory Documents Regulatory Documents Rocky Flats Site, Colorado Regulatory Documents All documents are Adobe Acrobat files. pdf_icon Notification that GS01 is no longer an RFLMA Point of Compliance (POC) Third Five-Year Review Report for the Rocky Flats Site Rocky Flats Legacy Management Agreement Environmental Covenant, November 14, 2011 Corrective Action Decision/Record of Decision Amendment for Rocky Flats Plant (USDOE) Central Operable Unit Proposed Plan for the Rocky Flats CAD/ROD Amendment (June 2011) Second Five-Year Review Report for the Rocky Flats Site Corrective Action Decision/Record of Decision for Rocky Flats Plant (USDOE) Peripheral Operable Unit and Central Operable Unit Rocky Flats Environmental Technology Site Proposed Plan Present Landfill Monitoring and Maintenance Plan

89

Report on Matters Identified at the Rocky Flats Field Office...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rocky Flats Field Office During the Audit of the Department's Consolidated Fiscal Year 1996 Financial Statements, WR-FS-97-03 Report on Matters Identified at the Rocky Flats Field...

90

Rocky Great Mountains Southwest Plains  

E-Print Network (OSTI)

of snags and cavities for wildlife can utilize the existing tree species composition, which varied. Study Area The study was conducted on a 160-ha area, in the eastern portion of Hotel Creek Watershed

91

Hanford/Rocky Flats collaboration on development of supercritical carbon dioxide extraction to treat mixed waste  

Science Conference Proceedings (OSTI)

Proposals for demonstration work under the Department of Energy`s Mixed Waste Focus Area, during the 1996 through 1997 fiscal years included two applications of supercritical carbon dioxide to mixed waste pretreatment. These proposals included task RF15MW58 of Rocky Flats and task RL46MW59 of Hanford. Analysis of compatibilities in wastes and work scopes yielded an expectation of substantial collaboration between sites whereby Hanford waste streams may undergo demonstration testing at Rocky Flats, thereby eliminating the need for test facilities at Hanford. This form of collaboration is premised the continued deployment at Rocky Flats and the capability for Hanford samples to be treated at Rocky Flats. The recent creation of a thermal treatment contract for a facility near Hanford may alleviate the need to conduct organic extraction upon Rocky Flats wastes by providing a cost effective thermal treatment alternative, however, some waste streams at Hanford will continue to require organic extraction. Final site waste stream treatment locations are not within the scope of this document.

Hendrickson, D.W.; Biyani, R.K. [Westinghouse Hanford Co., Richland, WA (United States); Brown, C.M.; Teter, W.L. [Kaiser-Hill Co., Golden, CO (United States)

1995-11-01T23:59:59.000Z

92

Issues evaluation process at Rocky Flats Plant  

SciTech Connect

This report describes the issues evaluation process for Rocky Flats Plant as established in July 1990. The issues evaluation process was initiated February 27, 1990 with a Charter and Process Overview for short-term implementation. The purpose of the process was to determine the projects required for completion before the Phased Resumption of Plutonium Operations. To determine which projects were required, the issues evaluation process and emphasized risk mitigation, based on a ranking system. The purpose of this report is to document the early design of the issues evaluation process to record the methodologies used that continue as the basis for the ongoing Issues Management Program at Rocky Flats Plant.

Smith, L.C.

1992-04-16T23:59:59.000Z

93

Rocky Mountain (PADD 4) Refinery Operable Atmospheric Crude Oil ...  

U.S. Energy Information Administration (EIA)

Rocky Mountain (PADD 4) Refinery Operable Atmospheric Crude Oil Distillation Capacity as of January 1 (Barrels per Calendar Day)

94

Production system improvement : floor area reduction and cycle time analysis  

E-Print Network (OSTI)

A medical device company challenged a research team to reduce the manufacturing floor space required for an occlusion system product by one third. The team first cataloged equipment location and size, detailed the processes ...

Peterson, Jennifer J. (Jennifer Jeanne)

2012-01-01T23:59:59.000Z

95

Comparative risk analysis for the Rocky Flats Plant integrated project planning  

Science Conference Proceedings (OSTI)

The Rocky Flats Plant is developing, with active stakeholder a comprehensive planning strategy that will support transition of the Rocky Flats Plant from a nuclear weapons production facility to site cleanup and final disposition. Final disposition of the Rocky Flats Plant materials and contaminants requires consideration of the interrelated nature of sitewide problems, such as material movement and disposition, facility and land use endstates, costs relative risks to workers and the public, and waste disposition. Comparative Risk Analysis employs both incremental risk and cumulative risk evaluations to compare risks from postulated options or endstates. These postulated options or endstates can be various remedial alternatives, or future endstate uses of federal agency land. Currently, there does not exist any approved methodology that aggregates various incremental risk estimates. Comparative Risk Analysis has been developed to aggregate various incremental risk estimates to develop a site cumulative risk estimate. This paper discusses development of the Comparative Risk Analysis methodology, stakeholder participation and lessons learned from these challenges.

Jones, M.E.; Shain, D.I.

1994-05-01T23:59:59.000Z

96

Independent Oversight Special Review, Rocky Flats Closure Project Site -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Special Review, Rocky Flats Closure Project Special Review, Rocky Flats Closure Project Site - April 2001 Independent Oversight Special Review, Rocky Flats Closure Project Site - April 2001 April 2001 Special Review of the Rocky Flats Closure Project Site The U.S. Department of Energy (DOE) Office of Independent Environment, Safety, and Health Oversight (EH-2), within the Office of Environment, Safety and Health, conducted an independent oversight Special Review at the Rocky Flats Closure Project (RFCP). The Special Review was conducted at the request of the Rocky Flats Field Office (RFFO), which is the DOE organizational element with responsibility for the RFCP (formerly known as the Rocky Flats Environmental Technology Site). Kaiser-Hill Company, LLC (KH) is the prime contractor for the RFCP. RFCP's project-oriented approach and aggressive scheduling have resulted

97

Preliminary Notice of Violation, Rocky Mountain Remediation Services -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rocky Mountain Remediation Rocky Mountain Remediation Services - EA-97-04 Preliminary Notice of Violation, Rocky Mountain Remediation Services - EA-97-04 June 6, 1997 Preliminary Notice of Violation issued to Rocky Mountain Remediation Services related to a Radioactive Material Release during Trench Remediation at the Rocky Flats Environmental Technology Site, (EA-97-04) This letter refers to the Department of Energy's (DOE) evaluation of noncompliances associated with the dispersal of radioactive material during the remediation of trenches. Preliminary Notice of Violation, Rocky Mountain Remediation Services - EA-97-04 More Documents & Publications Preliminary Notice of Violation, Kaiser-Hill Company - EA-97-03 Consent Order, Kaiser-Hill Company, LLC - EA 98-03 Preliminary Notice of Violation , Rocky Flats Environmental Technology Site

98

DOE - Office of Legacy Management -- Rocky Flats SOG  

NLE Websites -- All DOE Office Websites (Extended Search)

SOG SOG Rocky Flats Site, Colorado Rocky Flats, Colorado, Site Operations Guide All documents are Adobe Acrobat files. pdf_icon Site Operations Guide Appendixes Appendix A: Annual Site Inspection Checklist Appendix B: Example Contact Record Appendix C: Rocky Flats Site Soil Disturbance Evaluation Procedure Appendix D: Site-Specific Checklist Appendix E: Rocky Flats, Colorado, Site Erosion Control Monitoring and Maintenance Inspection Procedure Appendix F: Erosion Control Plan for Rocky Flats Property Central Operable Unit Appendix G: Wildland Fire Management Plan for the Rocky Flats, Colorado, Site Appendix H: Emergency Response Plan for the Rocky Flats Site Dams Appendix I: Additional Field Implementation Detail for Selected Monitoring Objectives Historic documents may contain links to outside sources. LM cannot attest

99

Independent Oversight Special Review, Rocky Flats Closure Project Site -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oversight Special Review, Rocky Flats Closure Project Oversight Special Review, Rocky Flats Closure Project Site - April 2001 Independent Oversight Special Review, Rocky Flats Closure Project Site - April 2001 April 2001 Special Review of the Rocky Flats Closure Project Site The U.S. Department of Energy (DOE) Office of Independent Environment, Safety, and Health Oversight (EH-2), within the Office of Environment, Safety and Health, conducted an independent oversight Special Review at the Rocky Flats Closure Project (RFCP). The Special Review was conducted at the request of the Rocky Flats Field Office (RFFO), which is the DOE organizational element with responsibility for the RFCP (formerly known as the Rocky Flats Environmental Technology Site). Kaiser-Hill Company, LLC (KH) is the prime contractor for the RFCP.

100

Categorical Exclusion Determinations: Western Area PowerAdministratio...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region June 5, 2012 CX-008778: Categorical Exclusion Determination Combined Crew Vegetation Management on...

Note: This page contains sample records for the topic "rockies area product" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Categorical Exclusion Determinations: Western Area PowerAdministratio...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mountain Region Categorical Exclusion Determinations issued by Western Area Power Administration-Rocky Mountain Region. DOCUMENTS AVAILABLE FOR DOWNLOAD June 20, 2013...

102

Projection of Favorable Gas-Producting Areas From Paleoenvironmental Data  

SciTech Connect

Paleoenvironmental biofacies analysis of recent wells in dark Devonian shales in the Applachian Basin has shown that these facies can be projected to areas with no control points. In particular, the facies distribution in Perry County, Kentucky, were found to be precisely those that were predicted earlier from biofacies and organic geochemical data from the VA-1 well in Wise County, Virginia, and the KY-2 well in Martin County, Kentucky. This demonstrates the importance of these data in assessing the volume of gas in the shale throughout the basin as well as in selecting future test sites. The recent biofacies and geochemical work together with a review of the tectonics of the basin have contributed to an evolving interpretation of the geologic control of the biofacies. While a marine environment persisted throughout the Upper Devonian over the Applachian and Illinois Basin (and probably the Michigan Basin), dynamic emergent areas controlled an intermittent introduction of large amounts of organic matter. Large amounts of non-marine organic matter were periodically transported in the basin from a dynamic source province to the Southeast; massive "blooms" of Tasmanites intermittently spread both east and west from the edges of the emerging Cincinnati Arch. At times one or the other of these organic types swept entirely across the basins; at other times a more normal open marine biota flourished and was deposited, probably under the influence of connections to the open seas to the south and northwest, the north being closed by the collision and suturing of continental plates and the east by the growing Applachian Mountains.

Zielinski, R.E.; Dixon, J. A.; McIver, R. D.; Reaugh, A. B.

1979-12-31T23:59:59.000Z

103

Oil and gas developments in Northern Rockies in 1976  

SciTech Connect

In 1976 the Northern Rockies experienced a 22% decline in drilling compard to 1975. All states suffered except North Dakota and South Dakota. North Dakota had an increase of 9.4% in total drilling; South Dakota had an increase of 14.2% in total drilling. A new and significant area in western Wyoming, the overthrust belt, had a 50% wildcat success rate. The exploration of Cretaceous stratigraphic sandstones in the Powder River Basin continues strongly. At the end of the year, activity in general was on the upswing, but there was not enough time to compensate for the doldrums of the summer when drilling decreased partly because of unfortunate government policies in the areas of price and environment.

Walker, R.E. (Gulf Energy and Minerals Co., Casper, WY); Maio, C.G.; Johnson, R.P.

1977-08-01T23:59:59.000Z

104

ROCKY MOUNTAIN OILFIELD TESTING CENTER PROJECT TEST RESULTS  

NLE Websites -- All DOE Office Websites (Extended Search)

BEAM MOUNTED GAS COMPRESSOR BEAM MOUNTED GAS COMPRESSOR (JACGAS COMPRESSOR) MARCH 3, 1998 FC970004/97PT23 RMOTC Test Report Number 97PT23 Jacgas Compressor Morrison International Iron Horse Compression Ltd. 9852-33 Avenue Edmonton, Alberta T6N 1C6 (403) 462-6847 David H. Doyle, Project Manager Rocky Mountain Oilfield Testing Center March 3, 1998 Introduction Gas compressors that mount on the walking beam of an oil well pumping unit have been tried with mixed success for many years. Gas compression at the wellhead instead of further downstream can 'increase both oil and gas production by reducing the casinghead gas pressure. Excess pressure on the annulus of the well reduces fluid inflow and restricts production. In old, shallow wells, the small amount of pressure (50 psi) may be sufficient to prevent the well from producing economically. Other applications include the unloading of water

105

Status Update: Closing Rocky Flats by 2006  

SciTech Connect

Safely closing Rocky Flats by December 2006 is a goal shared by many: the State of Colorado, the communities surrounding the site, the U.S. Congress, the Department of Energy (DOE), Kaiser-Hill and its team of subcontractors, the site's employees and taxpayers across the country. This paper will: provide a status of the Closure Project to date; describe important accomplishments of the past year; describe some of the closure-enhancing technologies enabling acceleration; and discuss the remaining challenges ahead.

Tuor, N.; Schubert, A.

2003-02-25T23:59:59.000Z

106

Hydraulic frac sets Rockies depth record  

SciTech Connect

A depth record for massive hydraulic fracture in the Rocky Mt. region was set April 22 with the treatment of a central Wyoming gas well. The No. 1-29 Moneta Hills Well was treated through perforations at 19,838 to 19,874 ft and 20,064 to 20,100 ft. Soon after, another well in the Madden Deep Field was subject to hydraulic fracture through perforations a

Not Available

1980-06-01T23:59:59.000Z

107

Survey of Productive Uses of Electricity in Rural Areas | Open Energy  

Open Energy Info (EERE)

Survey of Productive Uses of Electricity in Rural Areas Survey of Productive Uses of Electricity in Rural Areas Jump to: navigation, search Tool Summary Name: Survey of Productive Uses of Electricity in Rural Areas Agency/Company /Organization: Robert E. Fishbein Sector: Energy Focus Area: Renewable Energy, Economic Development, Energy Efficiency Phase: Get Feedback, Evaluate Effectiveness and Revise as Needed Topics: - Energy Access, Finance Resource Type: Lessons learned/best practices User Interface: Website Website: www.martinot.info/Fishbein_WB.pdf Cost: Free UN Region: Eastern Africa, Middle Africa, Northern Africa, Southern Africa, Western Africa Language: English The objective of the assignment is to survey and summarize the published literature as well as informal knowledge about the experience with promoting productive uses of

108

GIS-technologies for integrated assessment of the productive mining areas  

Science Conference Proceedings (OSTI)

The paper describes the bases of a new application of GIS-technologies for integrated assessment and comparison of the productive mining areas, involving a wide range of mining and technological factors, considering mineral properties, mineral occurrence conditions and geographical advantages of a mineral deposit location. The model capabilities are exemplified by a comparison of technological characteristics of coals, transportation and power supply infrastructure of the productive mining areas at the Kuznetsk Coal Basin.

Zamaraev, R.Y.; Oparin, V.N.; Popov, S.E.; Potapov, V.P.; Pyastunovich,O.L. [Russian Academy of Sciences, Kemerovo (Russian Federation)

2008-05-15T23:59:59.000Z

109

Unique process combination decontaminates mixed wastewater at Rocky Flats  

Science Conference Proceedings (OSTI)

This paper describes the Sitewide Water Treatment Facility (SWTF) used to process environmental remediation wastewaters found at the Rocky Flats Environmental Technology Site.

Kelso, William J.; Cirillo, J. Russ

1999-08-01T23:59:59.000Z

110

Former Worker Medical Screening Program - Rocky Flats Former...  

NLE Websites -- All DOE Office Websites (Extended Search)

Rocky Flats Worker Population Served: Construction Workers Principal Investigator: Knut Ringen, DrPH, MHA, MPH Toll-free Telephone: (800) 866-9663 Local Outreach Office: Dwayne...

111

2006 Annual Ecology Report for the Rocky Flats Site  

Office of Legacy Management (LM)

Ecology Report for the Rocky Flats Site Click on the links below to access different portions of the electronic annual report. 2006 Annual Report Sections Diffuse Knapweed...

112

Rocky Mountain E&P Technology Transfer Workshop  

NLE Websites -- All DOE Office Websites (Extended Search)

Rocky Mountain E&P Technology Transfer Workshop August 4, 2003 Table of Contents Disclaimer Papers and Presentations Disclaimer This report was prepared as an account of work...

113

The Plutonium Stabilization andPackaging System at the Rocky...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technology Site (Rocky Flats) produced nuclear weapons components for the Department of Energy. In January 1992, the primary mission of the site changed from nuclear weapons...

114

ROCKY MOUNTAIN OILFIELD TESTING CENTER PROJECT TEST RESULTS  

NLE Websites -- All DOE Office Websites (Extended Search)

LOW COST REFRACTURING LOW COST REFRACTURING JANUARY 23, 1998 FC9550/96PT14 RMOTC Test Report Number 96PT14 Low Cost Refracturing Rock Creek Enterprises 980 Rock Creek Road Buffalo, Wyoming 82834 (307) 684-5243 (307) 684-0902 (fax) David H. Doyle, Acting Project Manager Rocky Mountain Oilfield Testing Center January 23, 1998 Introduction There are relatively few stimulation options available to owners of marginal or stripper wells. These wells are commonly restricted in their production rates because of formation or wellbore damage near the wellbore. Current services available to remove this damage are compared to the small gains possible from old, marginal wells. Over time, several things can occur that cause the flow of oil into the wellbore to be restricted. First, carbonate or sulfate scale can accumulate around the well or in the perforations. The accumulated scale will block oil from

115

Rocky Mountain Sustainable Enterprises LLC | Open Energy Information  

Open Energy Info (EERE)

Enterprises LLC Enterprises LLC Jump to: navigation, search Name Rocky Mountain Sustainable Enterprises LLC Place Boulder, Colorado Zip 80302 Product Colorado-based biofuel producer, liquid waste recycler, and distributed resource consultancy. Coordinates 42.74962°, -109.714163° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.74962,"lon":-109.714163,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

116

ROCKY MOUNTAIN OILFIELD TESTING CENTER PROJECT TEST RESULTS  

NLE Websites -- All DOE Office Websites (Extended Search)

CHEMICAL & MICROBIAL CHEMICAL & MICROBIAL PARAFFIN CONTROL PROJECT DECEMBER 17, 1997 FC9544 / 96PT12 RMOTC Test Report Paraffin Control Project BDM Oklahoma/NIPER 220 N. Virginia Bartlesville, OK 4003 918-336-2400, FAX 918-337-4365 Leo Giangiacomo, Project Manager Rocky Mountain Oilfield Testing Center December 17. 1997 Abstract This report summarizes the field performance results of a comparison of chemical and microbial paraffin control systems. The two systems were selected from laboratory screening work. Well selection was based on production rates, produced fluids, and prior paraffin treatments. The treatments were performed on similar groups of wells over the same period of time, using quantities and techniques recommended by the supplier specifically for the wells to be treated. The tests were conducted by the U. S. Department of

117

Company Name Company Name Address Place Zip Sector Product Website  

Open Energy Info (EERE)

Area Bella Solar Bella Solar South Arthur Ave Louisville Colorado Gateway Solar Solar energy solutions and installer of PV panels http www bellaenergy com Rockies Area Bio...

118

Western Area Power Administration Rocky Mountain Region (RMR)  

NLE Websites -- All DOE Office Websites (Extended Search)

(RMR) (RMR) Meter Application Agreement (Boundary Meter, Revenue Meter, Delivery Point Change, or Usage or Ownership Change) Agreement Number and Effective Date (to be assigned by Western): Requesting Company Name: Street Address: City: State: Zip Code: Meter Type: Boundary Revenue Type of meter work requested (define project scope): Drawing Requirement: Please include a Utility System or Substation Single Line diagram of the proposed meter location. A legible, hand drawn diagram is acceptable.

119

Pages that link to "Rockies Area" | Open Energy Information  

Open Energy Info (EERE)

( links) Simply Efficient ( links) Solix Biofuels ( links) Sun Dog Energy ( links) Techsolas LLC ( links) Toltec Energy ( links) Tri...

120

Repackaging Rocky Flats Legacy Transuranic Waste  

Science Conference Proceedings (OSTI)

Repackaging legacy Transuranic (TRU), Transuranic Mixed (TRM), Low Level Waste (LLW), and Low Level Mixed (LLM) waste requires good characterization skills and the ability to adapt to less than ideal conditions. Repackaging legacy waste in a facility that is not undergoing Decontamination and Decommission (D and D) is optimum. However, repackaging any waste in a D and D facility, under cold and dark conditions, can be difficult. Cold and dark conditions are when the heating and air conditioning are no longer in service and the lighting consists of strands of lights hung throughout each of the rooms. Working under these conditions adds an additional level of stress and danger that must be addressed. The use of glovebags was very useful at Rocky Flats during the D and D of many buildings. Glovebags can be adapted for many different types of wastes and unusual conditions. Repackaging of legacy TRU waste, in a D and D facility, can be accomplished safely and cost effectively with the use of glovebags. In conclusion: the use of glovebags to repackage legacy TRU, TRM, LLW, or LLM waste was done safely and cost effectively at Rocky Flats. The cost of using glovebags was minimal. Glovebags are easily adaptable to whatever the waste configuration is. The use of glovebags, for repackaging of Legacy waste, allows D and D efforts to stay on schedule and on task. Without the use of glovebags, additional gloveboxes would have been required at Rocky Flats. Larger items, such as the HEPA filters, would have required the construction of a new large item repackaging glovebox. Repackaging in glovebags allows the freedom to either locate the glovebag by the waste or locate the glovebag in a place that least impacts D and D efforts. The use of glovebags allowed numerous configurations of waste to be repackaged without the use of gloveboxes. During the D and D of the Rocky Flats facility, which was in a cold and dark stage, D and D work was not impacted by the repackaging activity. Glovebags work well in facilities that are in the process of D and D or still in full operations because glovebags are very safe and cost effective.

McTaggart, Jerri Lynne [Los Alamos National Laboratory, 115 N. Main St., Carlsbad, New Mexico, 88220 (United States)

2008-01-15T23:59:59.000Z

Note: This page contains sample records for the topic "rockies area product" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

THE U.S. DEPARTMENT OF ENERGY'S FACILITY REUSE AT THE ROCKY FLATS...  

NLE Websites -- All DOE Office Websites (Extended Search)

FACILITY REUSE AT THE ROCKY FLATS ENVIRONMENTALTECHNOLOGY SITE, IG-0425 THE U.S. DEPARTMENT OF ENERGY'S FACILITY REUSE AT THE ROCKY FLATS ENVIRONMENTALTECHNOLOGY SITE, IG-0425 For...

122

Risk-Quantified Decision-Making at Rocky Flats  

SciTech Connect

Surface soils in the 903 Pad Lip Area of the Rocky Flats Environmental Technology Site (RFETS) were contaminated with {sup 239/240}Pu by site operations. To meet remediation goals, accurate definition of areas where {sup 239/240}Pu activity exceeded the threshold level of 50 pCi/g and those below 50- pCi/g needed definition. In addition, the confidence for remedial decisions needed to be quantified and displayed visually. Remedial objectives needed to achieve a 90 percent certainty that unremediated soils had less than a 10 percent chance of {sup 239/240}Pu activity exceeding 50-pCi/g. Removing areas where the chance of exceedance is greater than 10 percent creates a 90 percent confidence in the remedial effort results. To achieve the stipulated goals, the geostatistical approach of probability kriging (Myers 1997) was implemented. Lessons learnt: Geostatistical techniques provided a risk-quantified approach to remedial decision-making and provided visualizations of the excavation area. Error analysis demonstrated compliance and confirmed that more than sufficient soils were removed. Error analysis also illustrated that any soils above the threshold that were not removed would be of nominal activity. These quantitative approaches were useful from a regulatory, engineering, and stakeholder satisfaction perspective.

Myers, Jeffrey C. [Washington Safety Management Solutions, Aiken, South Carolina (United States)

2008-01-15T23:59:59.000Z

123

NATURAL HERITAGE RESOURCES OF THE ROCKY FLATS ENVIRONMENTAL TECHNOLOGY SITE  

E-Print Network (OSTI)

.S. Department of Energy's Rocky Flats Field Office for making this report possible. In particular, Dr. John.S. Department of Energy's Rocky Flats Field Office to inventory and rank the natural heritage resources at its Divide. The RFETS is part of the U.S. Department of Energy nuclear weapons manufacturing complex

124

AREA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AREA AREA FAQ # Question Response 316 vs DCAA FAQ 1 An inquiry from CH about an SBIR recipient asking if a DCAA audit is sufficient to comply with the regulation or if they need to add this to their audit they have performed yearly by a public accounting firm. 316 audits are essentially A-133 audits for for-profit entities. They DO NOT replace DCAA or other audits requested by DOE to look at indirect rates or incurred costs or closeouts. DCAA would never agree to perform A-133 or our 316 audits. They don't do A-133 audits for DOD awardees. The purpose of the audits are different, look at different things and in the few instances of overlap, from different perspectives. 316

125

Disposal of Rocky Flats residues as waste  

SciTech Connect

Work is underway at the Rocky Flats Plant to evaluate alternatives for the removal of a large inventory of plutonium-contaminated residues from the plant. One alternative under consideration is to package the residues as transuranic wastes for ultimate shipment to the Waste Isolation Pilot Plant. Current waste acceptance criteria and transportation regulations require that approximately 1000 cubic yards of residues be repackaged to produce over 20,000 cubic yards of WIPP certified waste. The major regulatory drivers leading to this increase in waste volume are the fissile gram equivalent, surface radiation dose rate, and thermal power limits. In the interest of waste minimization, analyses have been conducted to determine, for each residue type, the controlling criterion leading to the volume increase, the impact of relaxing that criterion on subsequent waste volume, and the means by which rules changes may be implemented. The results of this study have identified the most appropriate changes to be proposed in regulatory requirements in order to minimize the costs of disposing of Rocky Flats residues as transuranic wastes.

Dustin, D.F.; Sendelweck, V.S. [EG and G Rocky Flats, Inc., Golden, CO (United States). Rocky Flats Plant; Rivera, M.A. [Lamb Associates, Inc., Rockville, MD (United States)

1993-03-01T23:59:59.000Z

126

EA-1146: Radioactive Waste Storage at Rocky Flats Environmental Technology  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

46: Radioactive Waste Storage at Rocky Flats Environmental 46: Radioactive Waste Storage at Rocky Flats Environmental Technology Site, Golden, Colorado EA-1146: Radioactive Waste Storage at Rocky Flats Environmental Technology Site, Golden, Colorado SUMMARY This EA evaluates the environmental impacts of the proposal to convert buildings at the U.S. Department of Energy Rocky Flats Environmental Technology Site from their former uses to interim waste storage facilities in order to increase storage capacity for low-level waste, low-level mixed waste, transuranic waste, and transuranic mixed waste. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD April 9, 1996 EA-1146: Finding of No Significant Impact Radioactive Waste Storage at Rocky Flats Environmental Technology Site, Golden, Colorado

127

Independent Oversight Review, Rocky Flats Environmental Technology Site -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Oversight Review, Rocky Flats Environmental Technology Independent Oversight Review, Rocky Flats Environmental Technology Site - March 2000 Independent Oversight Review, Rocky Flats Environmental Technology Site - March 2000 March 2000 Review of the Rocky Flats Environmental Technology Site Transportation Emergency Management Program The U.S. Department of Energy (DOE) Office of Emergency Management Oversight, within the Office of Independent Oversight and Performance Assurance, conducted a transportation emergency management review and a follow-up review of the emergency management program at Rocky Flats Environmental Technology Site (RFETS) in February 2000. The primary purpose of this review was to assess the effectiveness of the Department's emergency management programs for transportation events involving hazardous materials (not related to transuranic waste or nuclear

128

Rocky Mountain Power - Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rocky Mountain Power - Net Metering Rocky Mountain Power - Net Metering Rocky Mountain Power - Net Metering < Back Eligibility Agricultural Commercial Fed. Government Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Buying & Making Electricity Solar Home Weatherization Wind Program Info State Idaho Program Type Net Metering Provider Rocky Mountain Power Idaho does not have a statewide net-metering policy. However, each of the state's three investor-owned utilities -- Avista Utilities, Idaho Power and Rocky Mountain Power -- has a net-metering tariff on file with the Idaho Public Utilities Commission (PUC). The framework of the utilities' net-metering programs is similar, in that each utility: (1) offers net

129

Preliminary Notice of Violation , Rocky Flats Environmental Technology Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Violation , Rocky Flats Environmental Violation , Rocky Flats Environmental Technology Site - EA-96-05 Preliminary Notice of Violation , Rocky Flats Environmental Technology Site - EA-96-05 October 7, 1996 Preliminary Notice of Violation issued to Safe Sites of Colorado related to Radiological and Work Control Deficiencies associated with Two Radiological Release Events at the Rocky Flats Environmental Technology Site, (EA-96-05) Based on our evaluation of these matters, DOE has concluded that violations of DOE's Occupational Radiation Protection Rule (10 CFR 835) and Quality Assurance Rule (10 CFR 830.120) likely occurred. An enforcement conference was held with you, as well as senior management of KHLL and Rocky Mountain Remediation Services (RMRS), on September 10, 1996. This conference included a discussion of the facts and circumstances surrounding these

130

Rocky Mountain Power - Energy FinAnswer | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rocky Mountain Power - Energy FinAnswer Rocky Mountain Power - Energy FinAnswer Rocky Mountain Power - Energy FinAnswer < Back Eligibility Agricultural Commercial Construction Industrial Savings Category Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Other Maximum Rebate Retrofit: 50% of eligible measure cost Lighting Energy Savings Limit: 50%-75% of savings Program Info State Utah Program Type Utility Rebate Program Rebate Amount 0.12/kWh annual energy savings + 50/kW average monthly on-peak demand savings Provider Rocky Mountain Power Rocky Mountain Power's Energy FinAnswer program provides cash incentives to help its commercial and industrial customers improve the efficiency of their existing facilities and build new facilities that are significantly

131

Water Monitoring Flume Replaced at the Rocky Flats, Colorado, Site |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Water Monitoring Flume Replaced at the Rocky Flats, Colorado, Site Water Monitoring Flume Replaced at the Rocky Flats, Colorado, Site Water Monitoring Flume Replaced at the Rocky Flats, Colorado, Site October 22, 2013 - 11:01am Addthis What does this project do? Goal 1. Protect human health and the environment In August of this year the U.S. Department of Energy (DOE) Office of Legacy Management (LM) Rocky Flats, site took advantage of an existing water diversion structure that was no longer needed, to replace an aging water monitoring flume and avoid future repairs that could interrupt data collection. The flume for Rocky Flats Legacy Management Agreement (RFLMA) Point of Evaluation (POE) monitoring location GS10 in South Walnut Creek was located at the bottom of fairly steep channel banks. The bank on the south side shows localized slumping and sliding toward the creek and GS10. Although

132

DOE - Office of Legacy Management -- Rocky Mountain Research Laboratories -  

Office of Legacy Management (LM)

Rocky Mountain Research Rocky Mountain Research Laboratories - CO 06 FUSRAP Considered Sites Site: ROCKY MOUNTAIN RESEARCH LABORATORIES (CO.06 ) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: 1020 Yuma Street , Denver , Colorado CO.06-1 Evaluation Year: Circa 1987 CO.06-3 Site Operations: Processed beryllium on a pilot scale. CO.06-1 Site Disposition: Eliminated - No indication of radioactive materials handled at the site CO.06-2 Radioactive Materials Handled: No Primary Radioactive Materials Handled: None Radiological Survey(s): None Indicated Site Status: Eliminated from further consideration under FUSRAP CO.06-2 Also see Documents Related to ROCKY MOUNTAIN RESEARCH LABORATORIES CO.06-1 - Rocky Mountain Research Letter; Burton to Smith; Subject:

133

Independent Oversight Review, Rocky Flats Environmental Technology Site -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rocky Flats Environmental Technology Rocky Flats Environmental Technology Site - March 2000 Independent Oversight Review, Rocky Flats Environmental Technology Site - March 2000 March 2000 Review of the Rocky Flats Environmental Technology Site Transportation Emergency Management Program The U.S. Department of Energy (DOE) Office of Emergency Management Oversight, within the Office of Independent Oversight and Performance Assurance, conducted a transportation emergency management review and a follow-up review of the emergency management program at Rocky Flats Environmental Technology Site (RFETS) in February 2000. The primary purpose of this review was to assess the effectiveness of the Department's emergency management programs for transportation events involving hazardous materials (not related to transuranic waste or nuclear

134

Microsoft Word - CX-RockyReach-MapleValley_Bridge_FY12_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KEPR-4 KEPR-4 SUBJECT: Environmental Clearance Memorandum Richard Ross Project Manager - TELF-TPP-3 Proposed Action: Rocky Reach-Maple Valley #1 Temporary Bridge Installation (116/4-117/1) PP&A Project No.: 2203 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance. Location: The project area is confined to the existing access road located to the south of the right-of-way corridor of Bonneville Power Administration's (BPA) Rocky Reach-Maple Valley 345-kV transmission line between miles 116-117. The proposed project, located in King County, Washington, is within BPA's Covington District. Proposed by: BPA Description of the Proposed Action: BPA is proposing to construct a temporary bridge over

135

Rocky Flats Environmental Technology Site Ecological Monitoring Program 1995 annual report  

Science Conference Proceedings (OSTI)

The Ecological Monitoring Program (ECMP) was established at the Rocky Flats Environmental Technology Site (Site) in September 1992. At that time, EcMP staff developed a Program Plan that was peer-reviewed by scientists from western universities before submittal to DOE RFFO in January 1993. The intent of the program is to measure several quantitative variables at different ecological scales in order to characterize the Rocky Flats ecosystem. This information is necessary to document ecological conditions at the Site in impacted and nonimpacted areas to determine if Site practices have had ecological impacts, either positive or negative. This information can be used by managers interested in future use scenarios and CERCLA activities. Others interested in impact analysis may also find the information useful. In addition, these measurements are entered into a database which will serve as a long-term information repository that will document long-term trends and potential future changes to the Site, both natural and anthropogenic.

NONE

1995-05-31T23:59:59.000Z

136

ROCKY MOUNTAIN OILFIELD TESTING CENTER PROJECT TEST RESULTS  

NLE Websites -- All DOE Office Websites (Extended Search)

IN-SITU H IN-SITU H 2 S BIOREMEDIATION JULY 11, 1994 FC9509 / 95PT3 Rocky Mountain Oilfield Testing Center 907 North Poplar, Suite 100, Casper, WY 82601 (307) 261-5000, ext. 5060; FAX (307) 261-5997 IN-SITU H2S BIOREMEDIATION NATIONAL PARAKLEEN COMPANY PREPARED BY Fred Brown Michael R. Tyler 731 W.Wadley Field Engineer Building O July 11, 1994 Suite 130 Midland, Texas 79705 Phone (915)-683-3076 Fax (915)-683-3081 TEST PURPOSE: To treat producing oil wells that contain high concentrations of H2S with a product that will lower the levels of H2S in the well. METHOD OF TREATMENT: A bio-nutrient product (55 gallons) was mixed with 120 bbls of produced tensleep water and the mixture was pumped down the annulus of selected wells. The well was then shut-in for a 24 hour period and then was returned to production.

137

Alternative and Renewable fuels and Vehicle Technology Program Subject Area: Biofuels production Facilities  

E-Print Network (OSTI)

Alternative and Renewable fuels and Vehicle Technology Program Subject Area: Biofuels production: Commercial Facilities · Applicant's Legal Name: Yokayo Biofuels, Inc. · Name of project: A Catalyst for Success · Project Description: Yokayo Biofuels, an industry veteran with over 10 years experience

138

Review of Beryllium Management Practices at Rocky Flats During Closure Operations  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE-Environmental Management DOE - Complex Wide Review of Beryllium Management Practices at Rocky Flats During Closure Operations Challenge Beryllium (Be) metal is used by DOE in weapons production, as a reactor moderator or reflector, and as a fuel element cladding. Workers who are exposed to high concentrations of beryllium often develop acute beryllium disease caused by the inhalation of beryllium dust or particles which can cause Be sensitivity or chronic Be disease (CBD), a disabling and often fatal lung disease. A review of Rocky Flats Environmental Technology Site (RFETS) Be practices put in place by Kaiser-Hill, the cleanup contractor, was initiated to determine the effectiveness of RFETS beryllium characterization and prevention programs and to determine what, if any, suggestions could be

139

Environmental Survey preliminary report, Rocky Flats Plant, Golden, Colorado  

SciTech Connect

This report presents the preliminary findings of the Environmental Survey of the United States Department of Energy (DOE), Rocky Flats Plant (RFP), conducted August 11 through 22, 1986. The Survey is being conducted by an multidisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team members are outside experts supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the RFP. The Survey covers all environmental media and all areas of environmental regulations. It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involves the review of existing site environmental data observations of the operations carried on at RFP, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain environmental problems identified during its on-site activates. The Sampling and Analysis Plan is being executed by DOE's Oak Ridge National Laboratory. When completed, the results will be incorporated into the RFP Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the RFP Survey. 75 refs., 24 figs., 33 tabs.

Not Available

1987-06-01T23:59:59.000Z

140

Rocky Mountain Power - New Homes Program for Builders | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rocky Mountain Power - New Homes Program for Builders Rocky Mountain Power - New Homes Program for Builders Rocky Mountain Power - New Homes Program for Builders < Back Eligibility Construction Installer/Contractor Multi-Family Residential Residential Savings Category Heating & Cooling Cooling Commercial Heating & Cooling Appliances & Electronics Home Weatherization Construction Commercial Weatherization Design & Remodeling Other Sealing Your Home Ventilation Heat Pumps Commercial Lighting Lighting Windows, Doors, & Skylights Program Info State Utah Program Type Utility Rebate Program Rebate Amount '''New Construction Whole Home Options''' Home Performance ENERGY STAR Version 3 Certified Home: $500 (Single Family); $200 (Multifamily) ENERGY STAR Version 3 Certified Home: $250 (Single Family); $150 (Multifamily)

Note: This page contains sample records for the topic "rockies area product" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Rocky Mountain Power - FinAnswer Express | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rocky Mountain Power - FinAnswer Express Rocky Mountain Power - FinAnswer Express Rocky Mountain Power - FinAnswer Express < Back Eligibility Agricultural Commercial Construction Industrial Savings Category Other Home Weatherization Commercial Weatherization Heating & Cooling Commercial Heating & Cooling Cooling Manufacturing Heat Pumps Appliances & Electronics Commercial Lighting Lighting Insulation Design & Remodeling Windows, Doors, & Skylights Program Info State Idaho Program Type Utility Rebate Program Rebate Amount '''New Construction/Major Renovation Only''' Interior Lighting: $0.08/kwh annual energy savings LED Fixture (Exterior): $100 Induction Fixture (Exterior): $125 CFL Wallpack (Exterior): $30 Lighting Control (Exterior): $70 '''Retrofit Only''' Fluorescent Fixture Upgrades: $5-$20/fixture

142

Final Transuranic Waste Shipment Leaves Rocky Flats | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Transuranic Waste Shipment Leaves Rocky Flats Final Transuranic Waste Shipment Leaves Rocky Flats Final Transuranic Waste Shipment Leaves Rocky Flats April 19, 2005 - 12:23pm Addthis Cleanup Ahead of Schedule, On Track to Save Taxpayers Billions GOLDEN, CO. - A major environmental victory was achieved at the Rocky Flats Site in Golden, Colo., today when the final remaining shipment of radioactive, transuranic (TRU) waste left the property on a truck bound for an underground waste repository in New Mexico. This major milestone is another step toward the final conversion of the site to a National Wildlife Refuge managed by the U.S. Fish and Wildlife Service. "This is great news for all of Colorado, and would not have been possible without hand-in-glove cooperation between the Department of Energy, the

143

Inversion Breakup in Small Rocky Mountain and Alpine Basins  

Science Conference Proceedings (OSTI)

Comparisons are made between the postsunrise breakup of temperature inversions in two similar closed basins in very different climate settings, one in the eastern Alps and one in the Rocky Mountains. The small, high-altitude, limestone sinkholes ...

C. David Whiteman; Bernhard Pospichal; Stefan Eisenbach; Philipp Weihs; Craig B. Clements; Reinhold Steinacker; Erich Mursch-Radlgruber; Manfred Dorninger

2004-08-01T23:59:59.000Z

144

Final Rocky Flats Cleanup Agreement, July 19, 1996 Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rocky Flats Cleanup Agreement Rocky Flats Cleanup Agreement State Colorado Agreement Type Federal Facility Agreement Legal Driver(s) CERCLA/RCRA Scope Summary Establish the regulatory framework for achieving the ultimate cleanup of the Rocky Flats Site. Parties DOE; US EPA; The State of Colorado Date 7/19/1996 SCOPE * Establish the regulatory framework for achieving the ultimate cleanup of the Rocky Flats Site. * Ensure that the environmental impacts associated with activities at the Site will continue to be investigated and that appropriate response actions are taken. * Establish a procedural framework and schedule for developing, implementing, and monitoring appropriate response actions at the site. * Coordinate all of DOE's cleanup obligations under CERCLA, RCRA, and the Colorado

145

Rocky Flats Former Construction Workers, Construction Worker Screening  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rocky Flats Former Construction Workers, Construction Worker Rocky Flats Former Construction Workers, Construction Worker Screening Projects Rocky Flats Former Construction Workers, Construction Worker Screening Projects Project Name: Building Trades National Medical Screening Program Covered DOE Site: Rocky Flats Worker Population Served: Construction Workers Principal Investigator: Knut Ringen, DrPH, MHA, MPH Toll-free Telephone: (800) 866-9663 Local Outreach Office: Dwayne Adkins 7510 W. Mississippi Ave., Suite 230 Lakewood, CO 80226 Website: http://www.btmed.org This project is intended to provide free medical screening to former workers in the building trades (construction workers). The screening targets health problems resulting from exposures, including asbestos, beryllium, cadmium, chromium, lead, mercury, noise, radiation, silica

146

Microsoft Word - RockyFlatsCRO20030221.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

300,000 Block Grant to the 300,000 Block Grant to the Rocky Flats Community Reuse Organization Money Will Be Used To Develop Comprehensive Refuge Plan for Rocky Flats WASHINGTON, DC - The Department of Energy (DOE) today announced that it will award $300,000 to the Rocky Flats Coalition of Local Governments. A CRO is an organization recognized by the Energy Department that can apply for funding for programs that can modify the impacts of workforce restructuring at its facilities and reduce community dependence on the department's activities. This grant will enable the community reuse organization (CRO) to continue to play a critical role in working with the Energy Department on the development of a comprehensive refuge plan for Rocky Flats, review cleanup and closure documents to ensure that they meet long-term

147

Rocky Flats 100th Shipments Arrives at WIPP  

NLE Websites -- All DOE Office Websites (Extended Search)

RELEASE Rocky Flats For Immediate Release Contact: Karen Lutz, DOE RFFO, 303966-4546 01-08 Jennifer Thompson, Kaiser-Hill, 303966-6285 Kate Foster, Westinghouse TRU Solutions,...

148

Rocky Mountain (PADD 4) Foreign Crude Oil Refinery Receipts by ...  

U.S. Energy Information Administration (EIA)

Rocky Mountain (PADD 4) Foreign Crude Oil Refinery Receipts by Tank Cars (Rail) (Thousand Barrels) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8

149

Rocky Flats, Colorado, Site Quarterly Report of Site Surveillance  

Office of Legacy Management (LM)

Calendar Year 2013 October 2013 This page intentionally left blank U.S. Department of Energy Rocky Flats Site Quarterly Report of Site Surveillance and Maintenance Activities-2nd...

150

Rocky Mountain Power - Residential Energy Efficiency Rebate Program...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for contractor) Duct Sealing: 275 - 375 (75 for contractor) Windows: 1sq. ft. Insulation: 0.15 - 0.60sq. ft. Rocky Mountain Power offers the Home Energy Savings Program...

151

Rocky Mountain (PADD 4) Imports of Crude Oil and Petroleum ...  

U.S. Energy Information Administration (EIA)

Area: Period-Unit: Download Series History: Definitions, Sources & Notes: Show Data By: Product: Area: Mar-13 Apr-13 May-13 Jun-13 Jul-13 Aug-13 View ... 51: 26: 1984 ...

152

Comparison of Permian basin giant oil fields with giant oil fields of other U. S. productive areas  

SciTech Connect

Covering over 40 million ac, the Permian basin is the fourth largest of the 28 productive areas containing giant fields. The 56 giant fields in the basin compare with the total of 264 giant oil fields in 27 other productive areas. Cumulative production figures of 18 billion bbl from the giant fields in the Permian basin are the largest cumulative production figures from giant fields in any of the productive areas. An estimated 1.9 billion bbl of remaining reserves in giant fields rank the basin third among these areas and the 19.9 billion bbl total reserves in giant fields in the basin are the largest total reserves in giant fields in any of the productive areas. The 1990 production figures from giant fields place the basin second in production among areas with giant fields. However, converting these figures to by-basin averages for the giant fields places the Permian basin 12th in field size among the areas with giant fields. Based on average reserves per well, the basin ranks 18th. Average 1990 production per giant field place the basin seventh and the average 1990 production per well in giant fields place the Permian basin 14th among the areas with giant fields.

Haeberle, F.R. (Consultant Geologist, Dallas, TX (United States))

1992-04-01T23:59:59.000Z

153

Mercury audit at Rocky Mountain Arsenal  

Science Conference Proceedings (OSTI)

This report presents the results of an environmental compliance audit to identify potential mercury-containing equipment in 261 building and 197 tanks at the Rocky Mountain Arsenal (RMA). The RMA, located near Denver, Colorado, is undergoing clean up and decommissioning by the Department of the Army. Part of the decommissioning procedure is to ensure that all hazardous wastes are properly identified and disposed of. The purpose of the audit was to identify any mercury spills and mercury-containing instrumentation. The audit were conducted from April 7, 1992, through July 16, 1992, by a two-person team. The team interviewed personnel with knowledge of past uses of the buildings and tanks. Information concerning past mercury spills and the locations and types of instrumentation that contain mercury proved to be invaluable for an accurate survey of the arsenal. The team used a Jerome{reg_sign} 431-X{trademark} Mercury Vapor Analyzer to detect spills and confirm locations of mercury vapor. Twelve detections were recorded during the audit and varied from visible mercury spills to slightly elevated readings in the corners of rooms with past spills. The audit also identified instrumentation that contained mercury. All data have been incorporated into a computerized data base that is compatible with the RMA data base.

Smith, S.M.; Jensen, M.K. [Oak Ridge National Lab., TN (United States); Anderson, G.M. [Rocky Mountain Arsenal, Denver, CO (United States)

1994-02-01T23:59:59.000Z

154

Western Area Power Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

Loveland Area Projects November 29-30, 2011 2 Agenda * Overview of Western Area Power Administration * Post-1989 Loveland Area Projects (LAP) Marketing Plan * Energy Planning and Management Program * Development of the 2025 PMI Proposal * 2025 PMI Proposal * 2025 PMI Comment Period & Proposal Information * Questions 3 Overview of Western Area Power Administration (Western) * One of four power marketing administrations within the Department of Energy * Mission: Market and deliver reliable, renewable, cost-based Federal hydroelectric power and related services within a 15-state region of the central and western U.S. * Vision: Provide premier power marketing and transmission services Rocky Mountain Region (RMR) is one of five regional offices 4 Rocky Mountain Region

155

Implementation of IAEA safeguards at the Rocky Flats Environmental Technology Site  

Science Conference Proceedings (OSTI)

When President Clinton spoke to the United Nations General Assembly in September 1993, he offered to place US excess defense nuclear material under International Atomic Energy Agency (IAEA) safeguards, before the next Nuclear Nonproliferation Treaty (NPT) Extension Conference. This set in motion a flurry of activities at three DOE facilities, including Rocky Flats Environmental Technology Site (Site). With general guidance from DOE Headquarters, the facility selected a suitable storage area, identified appropriate materials, and acquired the necessary instrumentation to implement full-scale IAEA safeguards on excess plutonium oxide.

Giacomini, J.J.; Finleon, C.A.; Larsen, R.K. [EG and G Rocky Flats, Inc., Golden, CO (United States). Rocky Flats Plant; Lucas, M.; Langner, D. [Los Alamos National Lab., NM (United States)

1995-07-01T23:59:59.000Z

156

State geothermal commercialization programs in seven Rocky Mountain states. Semiannual progress report, January-July 1981  

SciTech Connect

The activities and findings of the seven state commercialization teams participating in the Rocky Mountain Basin and Range commercialization program are described. For each state (Colorado, Montana, New Mexico, North and South Dakota, Utah, and Wyoming), prospect identification, area development plans, site specific development analyses, time-phased project plans, the aggregated prospective geothermal energy use, and institutional analyses are discussed. Public outreach activities are also covered, and findings and recommendations are given for each state. Some background information about the program is provided. (LEW)

Lunis, B.C.; Toth, W.J. (comps.)

1982-05-01T23:59:59.000Z

157

State geothermal commercialization programs in seven Rocky Mountain states. Semiannual progress report, July-December 1981  

SciTech Connect

The activities and findings of the seven state commercialization teams participating in the Rocky Mountain Basin and Range commercialization program are described. The period covered is July through December 1981. Background information is provided, program objectives and the technical approach used are discussed, and the benefits of the program are described. Prospect identification, area development plans, site specific development analyses, time-phased project plans, the aggregated prospective geothermal energy use, and institutional analyses are discussed. Public outreach activities are covered and findings and recommendations are summarized.

Lunis, B.C. (ed.)

1982-08-01T23:59:59.000Z

158

Rocky Mountain Power - FinAnswer Express | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rocky Mountain Power - FinAnswer Express Rocky Mountain Power - FinAnswer Express Rocky Mountain Power - FinAnswer Express < Back Eligibility Agricultural Commercial Construction Industrial Multi-Family Residential Savings Category Other Home Weatherization Commercial Weatherization Heating & Cooling Commercial Heating & Cooling Cooling Heat Pumps Appliances & Electronics Commercial Lighting Lighting Manufacturing Insulation Design & Remodeling Windows, Doors, & Skylights Program Info State Utah Program Type Utility Rebate Program Rebate Amount Interior Lighting: $0.08/kWh annual savings Induction Fixture (Exterior): $125/unit LED Outdoor/Roadway Fixture (Exterior): $100/unit CFL Wall Pack (Exterior): $30/unit Lighting Controls: $75/sensor Wall Insulation: $0.07/sq. ft. Roof Insulation: $0.05/sq. ft.

159

Rocky Mountain Power - Residential Energy Efficiency Rebate Program |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rocky Mountain Power - Residential Energy Efficiency Rebate Program Rocky Mountain Power - Residential Energy Efficiency Rebate Program Rocky Mountain Power - Residential Energy Efficiency Rebate Program < Back Eligibility Installer/Contractor Multi-Family Residential Residential Savings Category Home Weatherization Commercial Weatherization Heating & Cooling Cooling Commercial Heating & Cooling Appliances & Electronics Commercial Lighting Lighting Water Heating Program Info State Utah Program Type Utility Rebate Program Rebate Amount Clothes Washers: up to $50 Dishwashers: $20 Refrigerator: $40 Freezer: $20 Electric Water Heaters: $50 CFL/LED Light Fixtures: $20/fixture Insulation: $0.15 - $0.65/sq. ft., plus potential bonus Windows: $0.50 - $2/sq. ft. Room Air Conditioners: $30 Duct Sealing/Insulation/Weatherization (Electric): up to $300

160

Rocky Flats Site Expands Solar Power for Treating Groundwater | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rocky Flats Site Expands Solar Power for Treating Groundwater Rocky Flats Site Expands Solar Power for Treating Groundwater Rocky Flats Site Expands Solar Power for Treating Groundwater April 17, 2013 - 1:26pm Addthis Subcontractor personnel install solar panels and other infrastructure on a 40-foot conex box that houses the batteries and control equipment for the 6 kilowatt photovoltaic system that powers the ETPTS groundwater treatment system. Subcontractor personnel install solar panels and other infrastructure on a 40-foot conex box that houses the batteries and control equipment for the 6 kilowatt photovoltaic system that powers the ETPTS groundwater treatment system. DOE was able to minimize impacts to the habitat of a federally protected mouse and provide the potential for relatively easy relocation by mounting the solar panels on the side of the conex box that houses the batteries and other system equipment.

Note: This page contains sample records for the topic "rockies area product" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Rocky Flats Site Expands Solar Power for Treating Groundwater | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rocky Flats Site Expands Solar Power for Treating Groundwater Rocky Flats Site Expands Solar Power for Treating Groundwater Rocky Flats Site Expands Solar Power for Treating Groundwater April 17, 2013 - 1:26pm Addthis Subcontractor personnel install solar panels and other infrastructure on a 40-foot conex box that houses the batteries and control equipment for the 6 kilowatt photovoltaic system that powers the ETPTS groundwater treatment system. Subcontractor personnel install solar panels and other infrastructure on a 40-foot conex box that houses the batteries and control equipment for the 6 kilowatt photovoltaic system that powers the ETPTS groundwater treatment system. DOE was able to minimize impacts to the habitat of a federally protected mouse and provide the potential for relatively easy relocation by mounting the solar panels on the side of the conex box that houses the batteries and other system equipment.

162

Rocky Mountain Power - FinAnswer Express | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rocky Mountain Power - FinAnswer Express Rocky Mountain Power - FinAnswer Express Rocky Mountain Power - FinAnswer Express < Back Eligibility Agricultural Commercial Construction Industrial Installer/Contractor Savings Category Other Home Weatherization Commercial Weatherization Heating & Cooling Commercial Heating & Cooling Cooling Appliances & Electronics Manufacturing Heat Pumps Commercial Lighting Lighting Insulation Design & Remodeling Water Heating Windows, Doors, & Skylights Maximum Rebate Lighting Retrofit: 70% of project cost Program Info State Wyoming Program Type Utility Rebate Program Rebate Amount Custom: $0.10/annual kWh saved Interior Lighting: $0.08/kwh annual energy savings LED Fixture (Exterior): $100 Induction Fixture (Exterior): $125 Lighting Control (Exterior): $70 Air Conditioners and Heat Pumps: $50-$100/ton

163

Rocky Mountain Power - Energy FinAnswer | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

70% project cost 70% project cost New Construction: 50% Lighting: 50%-75% of savings Program Info State Wyoming Program Type Utility Rebate Program Rebate Amount $0.15/kWh annual energy savings + $50/kW average monthly demand savings Provider Rocky Mountain Power Rocky Mountain Power's Energy FinAnswer program provides incentives to help its customers improve the efficiency of existing facilities and build new facilities that are significantly more efficient than code. New construction and retrofit projects for all industrial facilities can participate as well as all new commercial projects and commercial retrofits in facilities larger than 20,000 square feet. Rocky Mountain Power will be involved from the beginning of the construction process. They will start by reviewing the facility plans and

164

Rocky Mountain Oilfield Testing Center | Open Energy Information  

Open Energy Info (EERE)

Oilfield Testing Center Oilfield Testing Center Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Rocky Mountain Oilfield Testing Center General Information Name Rocky Mountain Oilfield Testing Center Facility Rocky Mountain Oilfield Testing Center Sector Geothermal energy Location Information Coordinates 42.9724567°, -106.3160188° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.9724567,"lon":-106.3160188,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

165

Department of Energy Awards $300,000 Block Grant to the Rocky...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

300,000 Block Grant to the Rocky Flats Community Reuse Organization Department of Energy Awards 300,000 Block Grant to the Rocky Flats Community Reuse Organization Department of...

166

ROCKY MOUNTAIN OILFIELD TESTING CENTER PROJECT TEST RESULTS  

NLE Websites -- All DOE Office Websites (Extended Search)

PETROLEUM MAGNETICS INTERNATIONAL PETROLEUM MAGNETICS INTERNATIONAL NOVEMBER 28, 1996 FC9520 / 95PT8 ROCKY MOUNTAIN OILFIELD TESTING CENTER PROJECT TEST RESULTS PETROLEUM MAGNETIC INTERNATIONAL DOWNHOLE MAGNETS FOR SCALE CONTROL Prepared for: Industry Publication Prepared by: MICHAEL R. TYLER RMOTC Field Engineer November 28, 1995 650100/9520:jb ABSTRACT November 28, 1995 The Rocky Mountain Oilfield Testing Center (RMOTC) conducted a field test on the Petroleum Magnetics International (PMI) downhole magnet, at the Naval Petroleum Reserve No. 3 (NPR- 3) located 35 miles north of Casper in Natrona County, Wyoming. PMI of Odessa, Texas, states that the magnets are designed to reduce scale and paraffin buildup on the rods, tubing

167

ROCKY MOUNTAIN OILFIELD TESTING CENTER PROJECT TEST RESULTS  

NLE Websites -- All DOE Office Websites (Extended Search)

TANK LEVEL GAUGING SYSTEM TANK LEVEL GAUGING SYSTEM JULY 25, 1996 FC9519 / 95PT7 ROCKY MOUNTAIN OILFIELD TESTING CENTER TANK LEVEL GAUGING SYSTEM DOUBLE M ELECTRIC Prepared for: Industry Publication Prepared by: MICHAEL R. TYLER RMOTC Field Engineer July 25, 1996 551103/9519:jb ABSTRACT The Rocky Mountain Oilfield Testing Center (RMOTC) conducted a test of a Tank Level Gauging System at the Naval Petroleum Reserve No. 3 (NPR-3). Double M. Electric manufactures the equipment that incorporates an optical-encoder sending unit, cellular communications, and software interface. The system effectively displayed its capabilities for remote monitoring and recording of tank levels.

168

The US Department of Energy`s facility reuse at the Rocky Flats Environmental Technology Site  

Science Conference Proceedings (OSTI)

This audit was initiated to determine whether the Rocky Flats Environmental Technology Site was maximizing its reuse of excess facilities.

NONE

1998-08-01T23:59:59.000Z

169

Categorical Exclusion Determinations: Western Area PowerAdministratio...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

B1.3 Date: 12022009 Location(s): Fremont County, Wyoming Office(s): Western Area Power Administration-Rocky Mountain Region November 16, 2009 CX-000554: Categorical...

170

Categorical Exclusion Determinations: Western Area PowerAdministratio...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CX(s) Applied: B4.6 Date: 12132012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region December 11, 2012 CX-009532: Categorical...

171

Total Crude Oil and Petroleum Products Imports by Area of Entry  

U.S. Energy Information Administration (EIA) Indexed Site

by Area of Entry by Area of Entry Product: Total Crude Oil and Petroleum Products Crude Oil Natural Gas Plant Liquids and Liquefied Refinery Gases Pentanes Plus Liquefied Petroleum Gases Ethane Ethylene Propane Propylene Normal Butane Butylene Isobutane Isobutylene Other Liquids Hydrogen/Oxygenates/Renewables/Other Hydrocarbons Oxygenates (excl. Fuel Ethanol) Methyl Tertiary Butyl Ether (MTBE) Other Oxygenates Renewable Fuels (incl. Fuel Ethanol) Fuel Ethanol Biomass-Based Diesel Fuel Other Renewable Diesel Fuel Other Renewable Fuels Other Hydrocarbons Unfinished Oils Naphthas and Lighter Kerosene and Light Gas Oils Heavy Gas Oils Residuum Motor Gasoline Blending Components (MGBC) MGBC - Reformulated, RBOB MGBC - Conventional MGBC - Conventional, CBOB MGBC - Conventional, GTAB MGBC - Other Conventional Aviation Gasoline Blending Components Finished Petroleum Products Finished Motor Gasoline Reformulated Gasoline Reformulated Blended w/ Fuel Ethanol Conventional Gasoline Conventional Blended w/ Fuel Ethanol Conventional Blended w/ Fuel Ethanol, Ed55 and Lower Conventional Other Finished Aviation Gasoline Kerosene-Type Jet Fuel Kerosene-Type Bonded Aircraft Fuel Other Bonded Aircraft Fuel Kerosene Distillate Fuel Oil Distillate F.O., 15 ppm and under Distillate F.O., Bonded, 15 ppm and under Distillate F.O., Other, 15 ppm and under Distillate F.O., Greater than 15 to 500 ppm Distillate F.O., Bonded, Greater than 15 to 500 ppm Distillate F.O., Other, Greater than 15 to 500 ppm Distillate F.O., Greater than 500 ppm Distillate F.O., Greater than 500 to 2000 ppm Distillate F.O., Bonded, Greater than 500 to 2000 ppm Distillate F.O., Other, Greater than 500 ppm to 2000 ppm Distillate F.O., Greater than 2000 ppm Distillate F.O., Bonded, Greater than 2000 ppm Distillate F.O., Other, Greater than 2000 ppm Residual Fuel Oil Residual F.O., Bonded Ship Bunkers, Less than 0.31% Sulfur Residual F.O., Bonded Ship Bunkers, 0.31 to 1.00% Sulfur Residual F.O., Bonded Ship Bunkers, Greater than 1.00% Sulfur Petrochemical Feedstocks Naphtha for Petrochem. Feed. Use Other Oils for Petrochem Feed. Use Special Naphthas Lubricants Waxes Petroleum Coke Asphalt and Road Oil Miscellaneous Products Period-Unit: Monthly-Thousand Barrels Monthly-Thousand Barrels per Day Annual-Thousand Barrels Annual-Thousand Barrels per Day

172

Rocky Mountain (PADD 4) Field Production of Crude Oil ...  

U.S. Energy Information Administration (EIA)

456: 451: 448: 440: 1993: 435: 427: 441: 428: 442: 433: 426: 423: 422: 421: 418: 422: 1994: 415: 418: 414: 407: 408: 402: 368: 375: 401: 394: 391: 388: 1995: 401: 466 ...

173

Rocky Mountain (PADD 4) Product Supplied for Crude Oil and ...  

U.S. Energy Information Administration (EIA)

4,982: 5,787: 5,702: 5,935: 5,714: 2004-2013: Greater than 15 to 500 ppm Sulfur: 83: 33: 102: 40: 70: 78: 1994-2013: Greater than 500 ppm Sulfur: 6-16-11-30-18-22 ...

174

Long-Term Surveillance and Maintenance at the Rocky Flats Site: Lessons Learned Based on the First Years Real Experiences From the Field  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Long-Term Surveillance and Maintenance at Rocky Flats: Early Experiences and Lessons Learned - 8350 S. Surovchak U.S. Department of Energy, Office of Legacy Management 11025 Dover Street, Suite 1000, Westminster, CO 80021 L. Kaiser, R. DiSalvo, J. Boylan, G. Squibb, J. Nelson, B. Darr, M. Hanson S.M. Stoller Corporation 11025 Dover Street, Suite 1000, Westminster, CO 80021 ABSTRACT The U.S. Department of Energy's (DOE's) Rocky Flats Site was established in 1951 as part of the United States' nationwide nuclear weapons complex to manufacture nuclear weapons components. In 1992 weapons production halted, and the Rocky Flats mission changed to include environmental investigations, cleanup, and site closure. In October 2005, DOE and its

175

ROCKY MOUNTAIN OILFIELD TESTING CENTER PROJECT TEST RESULTS  

NLE Websites -- All DOE Office Websites (Extended Search)

PETRO-PLUG PETRO-PLUG BENTONITE PLUGGING JANUARY 27, 1998 Report No. RMOTC/97PT22 ROCKY MOUNTAIN OILFIELD TESTING CENTER PROJECT TEST RESULTS PETRO-PLUG BENTONITE PLUGGING Prepared for: INDUSTRY PUBLICATION Prepared by: Michael R. Tyler RMOTC Project Manager January 27, 1998 Report No. RMOTC/96ET4 CONTENTS Page Technical Description ...................................................................................................... 1 Problem ............................................................................................................................ 1 Solution ............................................................................................................................ 2 Operation..........................................................................................................................

176

Rocky Flats Cleanup Agreement implementation successes and challenges  

SciTech Connect

On July 19, 1996 the US Department of Energy (DOE), State of Colorado (CDPHE), and US Environmental Protection Agency (EPA) entered into an agreement called the Rocky Flats Cleanup Agreement (RFCA) for the cleanup and closure of the Rocky Flats Environmental Technology Site (RFETS or Rocky Flats). Major elements of the agreement include: an Integrated Site-Wide Baseline; up to twelve significant enforceable milestones per year; agreed upon soil and water action levels and standards for cleanup; open space as the likely foreseeable land use; the plutonium and TRU waste removed by 2015; streamlined regulatory process; agreement with the Defense Nuclear Facilities Safety Board (DNFSB) to coordinate activities; and a risk reduction focus. Successful implementation of RFCA requires a substantial effort by the parties to change their way of thinking about RFETS and meet the deliverables and commitments. Substantial progress toward Site closure through the implementation of RFCA has been accomplished in the short time since the signing, yet much remains to be done. Much can be learned from the Rocky Flats experience by other facilities in similar situations.

Shelton, D.C.

1997-02-01T23:59:59.000Z

177

Rocky Flats Plant Site Environmental Report for 1992  

Science Conference Proceedings (OSTI)

The Rocky Rats Plant Site Environmental Report provides summary information on the plant`s environmental monitoring programs and the results recorded during 1992. The report contains a compliance summary, results of environmental monitoring and other related programs, a review of environmental remediation activities, information on external gamma radiation dose monitoring, and radiation dose estimates for the surrounding population.

Cirrincione, D.A.; Erdmann, N.L. [eds.

1992-12-31T23:59:59.000Z

178

Disposition of Uranium -233 (sup 233U) in Plutonium Metal and Oxide at the Rocky Flats Environmental Technology Site  

Science Conference Proceedings (OSTI)

This report documents the position that the concentration of Uranium-233 ({sup 233}U) in plutonium metal and oxide currently stored at the DOE Rocky Flats Environmental Technology Site (RFETS) is well below the maximum permissible stabilization, packaging, shipping and storage limits. The {sup 233}U stabilization, packaging and storage limit is 0.5 weight percent (wt%), which is also the shipping limit maximum. These two plutonium products (metal and oxide) are scheduled for processing through the Building 371 Plutonium Stabilization and Packaging System (PuSPS). This justification is supported by written technical reports, personnel interviews, and nuclear material inventories, as compiled in the ''History of Uranium-233 ({sup 233}U) Processing at the Rocky Flats Plant In Support of the RFETS Acceptable Knowledge Program'' RS-090-056, April 1, 1999. Relevant data from this report is summarized for application to the PuSPS metal and oxide processing campaigns.

Freiboth, Cameron J.; Gibbs, Frank E.

2000-03-01T23:59:59.000Z

179

Categorical Exclusion Determinations: Western Area Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 1, 2013 April 1, 2013 CX-010106: Categorical Exclusion Determination Flaming Gorge Microwave Site Communications Building Access Road Repairs CX(s) Applied: B1.3 Date: 04/01/2013 Location(s): Utah Offices(s): Western Area Power Administration-Rocky Mountain Region March 26, 2013 CX-010105: Categorical Exclusion Determination Urban Transmission Line Danger Tree Management CX(s) Applied: B1.3 Date: 03/26/2013 Location(s): Colorado, Colorado, Colorado, Colorado, Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region January 23, 2013 CX-009804: Categorical Exclusion Determination Kersey West Switching Station Interconnection Kiowa Creek - Welc 115 Kilovolt Transmission Line CX(s) Applied: B4.1, B4.11 Date: 01/23/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

180

Categorical Exclusion Determinations: Western Area Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 29, 2012 March 29, 2012 CX-008407: Categorical Exclusion Determination Terry Ranch Road Substation CX(s) Applied: B1.24, B4.11 Date: 03/29/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region March 29, 2012 CX-008403: Categorical Exclusion Determination Multiple Structure Replacement Flaming Gorge to Vernal No. 1 138 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 03/29/2012 Location(s): Utah Offices(s): Western Area Power Administration-Rocky Mountain Region March 29, 2012 CX-008399: Categorical Exclusion Determination Erosion Control Measures Structure No. 110-3 Dave Johnston to Stegall 230 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 03/29/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

Note: This page contains sample records for the topic "rockies area product" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Categorical Exclusion Determinations: Western Area Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 16, 2009 December 16, 2009 CX-000556: Categorical Exclusion Determination Willoby Substation Construction Project-Weld County, Colorado CX(s) Applied: B4.11 Date: 12/16/2009 Location(s): Weld County, Colorado Office(s): Western Area Power Administration-Rocky Mountain Region December 2, 2009 CX-000555: Categorical Exclusion Determination Boysen-Pilot Butte 115-kilovolt Transmission Line Vegetation Management and Access Road Maintenance CX(s) Applied: B1.3 Date: 12/02/2009 Location(s): Fremont County, Wyoming Office(s): Western Area Power Administration-Rocky Mountain Region November 16, 2009 CX-000554: Categorical Exclusion Determination Ogallala Substation KY1A Transformer Replacement CX(s) Applied: B4.6 Date: 11/16/2009 Location(s): Ogallala, Nebraska Office(s): Western Area Power Administration-Rocky Mountain Region

182

Company Name Company Name Address Place Zip Sector Product Website  

Open Energy Info (EERE)

A2BE Carbon Capture LLC A2BE Carbon Capture LLC Panorama Ave Boulder A2BE Carbon Capture LLC A2BE Carbon Capture LLC Panorama Ave Boulder Colorado Biofuels Developing technology for producing valuable fuel and food from CO2 using algal photosynthesis and bio harvesting http www algaeatwork com Rockies Area AC Solar Inc AC Solar Inc P O Box Florence Colorado Gateway Solar Solar and wind sales for residential http www acsolar com Rockies Area ALD Nanosolutions ALD Nanosolutions E Burbank Street Unit Broomfield Colorado http www aldnanosolutions com contact php Rockies Area Abengoa Solar Abengoa Solar W th Ave Lakewood Colorado Gateway Solar Solar developer http www abengoasolar com Rockies Area Abound Solar Abound Solar Rocky Mountain Avenue Suite Loveland Colorado Gateway Solar Thin film cadmium telluride solar modules http www abound

183

ROCKY MOUNTAIN OILFIELD TESTING CENTER PROJECT TEST RESULTS  

NLE Websites -- All DOE Office Websites (Extended Search)

AJUST A PUMP BEAM PUMPING UNIT AJUST A PUMP BEAM PUMPING UNIT FEBRUARY 19, 1997 FC9532 / 95EC1 ROCKY MOUNTAIN OILFIELD TESTING CENTER AJUST A PUMP TEST Rosemond Manufacturing, Inc. (RMI) Prepared for: INDUSTRY PUBLICATION Prepared by: MICHAEL J. TAYLOR Project Manager February 19, 1997 650200/551107:9532 ABSTRACT The Rocky Mountain Oilfield Testing Center (RMOTC) conducted a test of a Model-2000 Ajust A Pump system at the Naval Petroleum Reserve No. 3 (NPR-3). Rosemond Manufacturing, Inc. (RMI) manufactures compact beam-pumping units that incorporate energy-efficient gear boxes. The equipment is designed to reduce operating costs and minimize maintenance labor. This report documents the equipment performance and the results of the Ajust A Pump test. The purpose of the test was to demonstrate claims of energy efficiency and reduced labor requirements. The test showed

184

DOE - Office of Legacy Management -- Rocky Flats Archive  

NLE Websites -- All DOE Office Websites (Extended Search)

Archive Archive Rocky Flats Site, Colorado Key Document Archive All documents are Adobe Acrobat files. pdf_icon NEPA - Rocky Flats Surface Water Configuration Environmental Assessment (EA) Site-Specific Uranium Standards Petition Site Surveillance and Maintenance Reports Quarterly Reports 2013 3rd Quarter 2nd Quarter Overview 1st Quarter Overview 2012 3rd Quarter Overview 2nd Quarter Overview 1st Quarter Overview 2011 3rd Quarter Overview 2nd Quarter Overview 1st Quarter Overview 2010 3rd Ouarter Overview 2nd Ouarter Overview 1st Quarter Overview 2009 1st Quarter Overview 2nd Ouarter Overview 3rd Quarter Overview 2008 1st Quarter Overview 2nd Quarter Overview 3rd Quarter Overview 2007 1st Quarter Overview 2nd Quarter Overview 3rd Quarter Overview 2006

185

Microsoft Word - Rocky Ridge_CX Memo .docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31, 2013 31, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Dave Tripp Project Manager - TEP-CSB-1 Proposed Action: Rocky Ridge Radio Station Upgrade Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.19 Microwave, meterological and radio towers Location: Powell County, Montana Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to upgrade its Rocky Ridge Radio Station located about 6 miles east of Garrison, Montana. The upgrade would involve replacing the existing analog communication system with a new digital communication system to ensure communication reliability. The site is located on Montana Department of Natural Resource Conservation land. Construction would be staged

186

Rocky Mountain Power - Energy FinAnswer | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

50% of eligible measure cost 50% of eligible measure cost Lighting Energy Savings Limit: 50%-75% of savings Payback Cap: 1 year; if incentive brings the simple payback below one year, the incenive is reduced so the simple payback equals one year Program Info State Idaho Program Type Utility Rebate Program Rebate Amount $0.12/kWh annual energy savings + $50/kW average monthly on-peak demand savings Provider Rocky Mountain Power Rocky Mountain Power's Energy FinAnswer program provides incentives to help its customers improve the efficiency of existing facilities and build new facilities that are significantly more efficient than code. New construction and retrofit projects for all industrial facilities can participate as well as all new commercial projects and commercial retrofits in facilities larger than 20,000 square feet.

187

ROCKY MOUNTAIN OILFIELD TESTING CENTER PROJECT TEST RESULTS  

NLE Websites -- All DOE Office Websites (Extended Search)

MAG-WELL DOWNHOLE MAGNETIC FLUID CONDITIONERS MAG-WELL DOWNHOLE MAGNETIC FLUID CONDITIONERS APRIL 4,1995 FC9511 / 95PT5 ROCKY MOUNTAIN OILFIELD TESTING CENTER MAG-WELL DOWNHOLE MAGNETIC FLUID CONDITIONERS PROJECT TEST RESULTES Prepared for: Industry Publication Prepared by: MICHAEL R. TYLER RMOTC Field Engineer November 28, 1995 650100/9511:jb ABSTRACT November 28, 1995 The Rocky Mountain Oilfield Testing Center (RMOTC) conducted a field test on the Mag-Well Downhole Magnetic Fluid Conditioners (MFCs), at the Naval Petroleum Reserve No. 3 (NPR- 3) located 35 miles north of Casper in Natrona County, Wyoming. Mag-Well, Inc., manufactures the MFCs, that are designed to reduce scale and paraffin buildup on the rods, tubing and downhole pump of producing oil wells. The Mag-Well magnetic tools failed to

188

Health Surveillance Outcomes in Former Rocky Flats Radiation Workers  

NLE Websites -- All DOE Office Websites (Extended Search)

Surveillance of Rocky Flats Radiation Workers Surveillance of Rocky Flats Radiation Workers Janice P. Watkins 1 , Elizabeth D. Ellis 1 , F. Joseph Furman 2 , Roger B. Falk 2 , Joe M. Aldrich 2 , and Donna L. Cragle 1 ORAU Technical Report # 2006-0408 1 Oak Ridge Institute for Science and Education, Center for Epidemiologic Research; P.O. Box 117; Oak Ridge, TN 37831-0117 2 Oak Ridge Institute for Science and Education, Center for Epidemiologic Research; 9950 W. 80 th Avenue, Suite 17; Arvada, CO 80005-3914 This report was funded by Department of Energy Environmental Health Division under contract number DE-AC05-00OR22750. Table of Contents List of Figures.................................................................................................................2 List of Tables

189

Rocky Mountain White Tilapia Aquaculture Low Temperature Geothermal  

Open Energy Info (EERE)

Tilapia Aquaculture Low Temperature Geothermal Tilapia Aquaculture Low Temperature Geothermal Facility Jump to: navigation, search Name Rocky Mountain White Tilapia Aquaculture Low Temperature Geothermal Facility Facility Rocky Mountain White Tilapia Sector Geothermal energy Type Aquaculture Location Alamosa, Colorado Coordinates 37.4694491°, -105.8700214° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

190

Colorado and the Accelerated Cleanup at Rocky Flats  

SciTech Connect

When the Rocky Flats closure project was declared complete in October 2005, it was the largest environmental cleanup to date. Even more impressive, it was ahead of schedule and well under budget. Several factors combined to produce this success including a performance-based contract with financial incentives, development and application of innovative technologies, and a regulator-backed accelerated approach to the cleanup process. The factor in this success in which the State of Colorado had the largest role was in developing and enforcing the Rocky Flats Cleanup Agreement. In compliance with this agreement, cleanup was accomplished by means of multiple interim actions that led to a comprehensive final decision at the end. A key element that allowed the accelerated cleanup was constant consultation among DOE, its contractor, and the regulators plus collaboration with stakeholders. (authors)

Spreng, C. [Public Health and Environment, Colorado Dept., Denver, CO (United States)

2007-07-01T23:59:59.000Z

191

Actinide solution processing at the Rocky Flats Environmental Technology Site  

SciTech Connect

The Department of Energy (DOE) has prepared an Environmental Assessment (EA), DOE/EA-1039, for radioactive solution removal and processing at Rocky Flats Environmental Technology Site, Golden, Colorado. The proposal for solution removal and processing is in response to independent safety assessments and an agreement with the State of Colorado to remove mixed residues at Rocky Flats and reduce the risk of future accidents. Monthly public meetings were held during the scoping and preparation of the EA. The scope of the EA included evaluations of alternative methods and locations of solution processing. A comment period from February 20, 1995 through March 21, 1995 was provided to the public and the State of Colorado to offer written comment on the EA. Comments were received from the State of Colorado and the U.S. Environmental Protection Agency. A response to the agency comments is included in the Final EA.

NONE

1995-04-01T23:59:59.000Z

192

Special Review of the Rocky Flats Closure Project Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April April 2001 Special Review of the Integrated Safety Management ISM OVERSIGHT Table of Contents EXECUTIVE SUMMARY ............................................................................... 1 1.0 INTRODUCTION ...................................................................................... 6 2.0 FOCUSED REVIEW OF THE INTEGRATED WORK CONTROL PROCESS AND LINE MANAGEMENT OVERSIGHT .............................................................................................. 8 2.1 Background ...................................................................................... 8 2.2 Line Management Oversight and Selected Other Management Systems .................................................................... 10 2.3 Rocky Flats Closure Project Integrated Work Control Process

193

DECOMMISSIONING CHALLENGES AT THE ROCKY FLATS ENVIRONMENTAL TECHNOLOGY SITE  

Science Conference Proceedings (OSTI)

This paper presents a discussion of the demolition of the Building 788 cluster at the Rocky Flats Environmental Technology Site (RFETS) in Golden, Colorado. The Building 788 Cluster was a Resource Conservation and Recovery Act (RCRA) permitted storage facilities and ancillary structures. Topics covered include the methods employed for Project Planning, Regulatory Compliance, Waste Management, Hazard Identification, Radiological Controls, Risk Management, Field Implementation, and Cost Schedule control, and Lessons Learned and Project Closeout.

Dorr, K. A.; Hoover, J.

2002-02-25T23:59:59.000Z

194

Canada's first subsea gas line conquers rocky approaches  

SciTech Connect

This paper reports on the installation of a gas pipeline system connecting Vancouver Island to the British Columbia mainland. The design challenges of this project have consisted of deep water (maximum 1,360 ft; 415 m) steep and rocky shores, and an irregular seabed topography. In addition, the project location is far from an established offshore construction market, necessitating long- distance mobilization of specialized equipment.

Yamauchi, H.M. (Westcoast Energy Inc., Vancouver (CA)); Timmermans, W.J. (Intec Engineering, Inc., Houston, TX (US))

1991-03-06T23:59:59.000Z

195

Rocky Flats Plant Site Environmental Report: 1993 Highlights  

Science Conference Proceedings (OSTI)

The Rocky Flats Plant Site Environmental Report provides summary information on the plant`s environmental monitoring programs and the results recorded during 1993. The report contains a compliance summary, results of environmental monitoring and other related programs, a review of environmental remediation activities, information on external gamma radiation dose monitoring, and radiation dose estimates for the surrounding population. This section provides an overview of these topics and summarizes more comprehensive discussions found in the main text of this annual report.

Not Available

1993-12-31T23:59:59.000Z

196

Developments in northern Rockies in 1979. [Tabular data and map  

SciTech Connect

In 1979, the Northern Rockies (Idaho, Montana, North Dakota, South Dakota, and Wyoming) had another increase in drilling. A total of 2500 wells was drilled during 1979 compared with 2433 during 1978. Exploratory wells resulted in 127 oil and 81 gas discoveries during 1979. Activities remained high in the natural gas provinces, but increased oil prices toward year end resulted in increased emphasis on exploration for oil.

Teselle, R.D.; Miller, D.D.; Thames, D.B. Jr.; Thuesen, R.A.

1980-09-01T23:59:59.000Z

197

Rocky Mountain Power - Solar Incentive Program | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rocky Mountain Power - Solar Incentive Program Rocky Mountain Power - Solar Incentive Program Rocky Mountain Power - Solar Incentive Program < Back Eligibility Commercial Fed. Government Industrial Local Government Nonprofit Residential Schools State Government Savings Category Solar Buying & Making Electricity Maximum Rebate Residential: $5,000 Small Non-Residential (up to 25 kW): $25,000 Large Non-Residential (greater than 25 kW, up to 1,000 kW): $800,000 Program Info Funding Source Rate-payer funds Start Date 9/1/2007 Expiration Date 12/31/2017 State Utah Program Type Utility Rebate Program Rebate Amount Program Year 2012/2013 (application period is closed): Residential: $1.25/W-AC Small Non-Residential (up to 25 kW): $1.00/W-AC Large Non-Residential (greater than 25 kW, up to 1,000 kW): $0.80/W-AC '''''Note: Applications for 2013 were accepted during a two-week period

198

Post-Closure Land Jurisdiction Transfer to the US Fish and Wildlife Service at Rocky Flats: Surviving the Safari Through Old Records and Other Lessons Learned  

SciTech Connect

The U.S. Department of Energy's (DOE's) Rocky Flats Site (Rocky Flats), located near Denver, Colorado, was listed on the Comprehensive Environmental Response, Compensation, and Liability Act National Priorities List (NPL) in 1989. Subsequent cleanup and closure activities were completed in October 2005 and the final remedy was selected in September 2006. The remedy is 'no further action' for the generally un-impacted Peripheral Operable Unit (OU), formerly known as the Buffer Zone, and institutional and physical controls with continued monitoring for the Central OU, formerly the industrialized area. The Peripheral OU has been deleted from the NPL and jurisdiction over the majority of land in that OU (3,953 acres) was transferred to the U.S. Fish and Wildlife Service (USFWS) on July 12, 2007, to establish the Rocky Flats National Wildlife Refuge. The remaining approximately 929 acres in the Peripheral OU were retained by DOE's Office of Legacy Management where outstanding mineral leases and mining operations exist. As mineral rights are purchased or mining operations and mineral leases are completed and fully reclaimed, jurisdiction of portions of the 929 acres will also be transferred to USFWS for inclusion into the refuge. During the almost 2 years since cleanup and closure work was completed at Rocky Flats, DOE and USFWS have worked the specific legal parameters, timing, and constraints of the 3,953-acre transfer. Many lessons have been learned, based on these early experiences. (authors)

Schiesswohl, S. [U.S. Department of Energy, Office of Legacy Management, Westminster, CO (United States); Hanson, M. [S.M. Stoller Corporation, Westminster, CO (United States)

2008-07-01T23:59:59.000Z

199

Land and Water Fund of the Rockies  

E-Print Network (OSTI)

Contract No. DE-AC36-99-GO10337NOTICE The submitted manuscript has been offered by an employee of the Midwest Research Institute (MRI), a contractor of the US Government under Contract No. DE-AC36-99GO10337. Accordingly, the US Government and MRI retain a nonexclusive royalty-free license to publish or reproduce the published form of this contribution, or allow others to do so, for US Government purposes. This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States government or any agency thereof. Available electronically at

R. L. Lehr; J. Nielsen; S. Andrews; M. Milligan

2001-01-01T23:59:59.000Z

200

Overview of Rocky Mountain Region's Capital Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning Workshop Planning Workshop Overview of Western's Current Transmission Planning Activities Robert H. Easton aeaston@wapa.gov (970) 461-7272 Transmission Planning - North Loveland, CO June 21, 2011 1 Transmission Planning Workshop AGENDA - 10-Yr Network Study Process NERC TPL- Study Process Capital Investment Plan 2 Transmission Planning Workshop 2011 10-YR Network Load Forecast Study and Process Transmission Planning Loveland, CO June 21, 2011 3 Purpose  Evaluate the steady state load serving capability of the integrated system.  Identify problem areas due to projected system load growth.  Allows for inclusion of necessary projects in Capital Investment Plan (CIP).  Ensure that system development keeps pace with load growth in order to continue serving Preference

Note: This page contains sample records for the topic "rockies area product" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Cropland Area and Net Primary Production Computed from 30 Years of USDA Agricultural Harvest Data  

Science Conference Proceedings (OSTI)

Croplands cover large areas of the globe and contribute significantly to the global carbon cycle. However, like other ecosystems, limited information exists on spatially explicit, ground-based estimates of carbon fluxes. In this study, county-...

Jeffrey A. Hicke; David B. Lobell; Gregory P. Asner

2004-07-01T23:59:59.000Z

202

Rocky Flats Neutron Detector Testing at Valduc, France  

Science Conference Proceedings (OSTI)

Recent program requirements of the US Department of Energy/NNSA have led to a need for a criticality accident alarm system to be installed at a newly activated facility. The Criticality Safety Group of the Lawrence Livermore National Laboratory (LLNL) was able to recover and store for possible future use approximately 200 neutron criticality detectors and 20 master alarm panels from the former Rocky Flats Plant in Golden, Colorado when the plant was closed. The Criticality Safety Group participated in a facility analysis and evaluation, the engineering design and review process, as well as the refurbishment, testing, and recalibration of the Rocky Flats criticality alarm system equipment to be used in the new facility. In order to demonstrate the functionality and survivability of the neutron detectors to the effects of an actual criticality accident, neutron detector testing was performed at the French CEA Valduc SILENE reactor from October 7 to October 19, 2010. The neutron detectors were exposed to three criticality events or pulses generated by the SILENE reactor. The first excursion was performed with a bare or unshielded reactor, and the second excursion was made with a lead shielded/reflected reactor, and the third excursion with a polyethylene reflected core. These tests of the Rocky Flats neutron detectors were performed as a part of the 2010 Criticality Accident Alarm System Benchmark Measurements at the SILENE Reactor. The principal investigators for this series of experiments were Thomas M. Miller and John C. Wagner of the Oak Ridge National Laboratory, with Nicolas Authier and Nathalie Baclet of CEA Valduc. Several other organizations were also represented, including the Y-12 National Security Complex, Lawrence Livermore National Laboratory, Los Alamos National Laboratory, CEA Saclay, and Babcock International Group.

Kim, S S; Dulik, G M

2011-01-03T23:59:59.000Z

203

SBOT WYOMING ROCKY MOUNTAIN OILFIELD CENTER POC Jenny Krom Telephone  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WYOMING WYOMING ROCKY MOUNTAIN OILFIELD CENTER POC Jenny Krom Telephone (307) 233-4818 Email jenny.krom@rmotc.doe.gov ADMINISTATIVE / WASTE / REMEDIATION Office Administrative Services 561110 Facilities Support Services 561210 Security Guards and Patrol Services 561612 Security Systems Services (except Locksmiths) 561621 Locksmiths 561622 Exterminating and Pest Control Services 561710 Janitorial Services 561720 Solid Waste Collection 562111 Hazardous Waste Collection 562112 Other Waste Collection 562119 Hazardous Waste Treatment and Disposal 562211 Solid Waste Landfill 562212 Solid Waste Combustors and Incinerators 562213 Other Nonhazardous Waste Treatment and Disposal 562219 Remediation Services 562910 Materials Recovery Facilities 562920 All Other Miscellaneous Waste Management Services 562998

204

Final Land Configuration for the Rocky Flats Environmental Technology Site  

SciTech Connect

Closure of the Rocky Flats Environmental Technology Site (RFETS) has been completed. The future land use of the site is designated as a National Wildlife Refuge. A joint effort between Kaiser-Hill, Department of Energy, U.S. Fish and Wildlife Service, Environmental Protection Agency, State of Colorado, and other stakeholders was initiated to provide direction for developing the final land configuration. Through early identification of issues and developing mutually agreeable solutions, the final land configuration of the site was successfully completed. (authors)

Stegen, R. L.; Kapinos, J. M.; Wehner, J. P.; Snyder, B. [Parsons, 1700 Broadway, Suite 900, Denver, Colorado 80290 (United States); Davis, R. W. [Kaiser-Hill Company, LLC, 9193 S. Jamaica, Englewood, Colorado 80112 (United States)

2006-07-01T23:59:59.000Z

205

Plutonium dissolution from Rocky Flats Plant incinerator ash  

SciTech Connect

Rockwell Hanford Operations (Rockwell) soon will commence recovery of plutonium from Rocky Flats Plant incinerator ash. In preparation for this processing, Rockwell undertook literature and laboratory studies to identify, select and optimize plutonium dissolution methods for treating the ash. Ash reburning, followed by dissolution in nitric acid containing calcium fluoride, was selected as the processing method for the ash. Recommended values of process parameters were identified. Using the selected process, 99.5% plutonium recovery was achieved, leaving about 12.7 wt % heel residue for an equal weight composite of the three ashes tested. 15 refs., 26 figs.

Delegard, C.H.

1985-06-01T23:59:59.000Z

206

The Plutonium Stabilization andPackaging System at the Rocky Flats Environmental Technology Site,IG-0554  

Energy.gov (U.S. Department of Energy (DOE))

From 1952 to 1989, the Rocky Flats Environmental Technology Site (Rocky Flats) produced nuclear weapons components for the Department of Energy. In January 1992, the primary mission of the site...

207

Independent Oversight Review of the Rocky Flats Environmental Technology Site Transportation Emergency Management Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rocky Rocky Flats Environmental Technology Site Transportation Emergency Management Program Independent Oversight Review of the March 2000 OVERSIGHT Table of Contents EXECUTIVE SUMMARY ................................................................... 1 1.0 INTRODUCTION ........................................................................... 4 2.0 RESULTS ......................................................................................... 6 Hazard Survey and Hazards Assessments .................................... 6 Program Plans and Procedures ..................................................... 7 Emergency Responder Performance and Preparation ............... 9 Offsite Interfaces ........................................................................... 10 Feedback and Continuous Improvement Process

208

Geologic and geotechnical assessment RFETS Building 371, Rocky Flats, Colorado  

SciTech Connect

This report describes the review and evaluation of the geological, geotechnical and geophysical data supporting the design basis analysis for the Rocky Flats Environmental Test Site (RFETS) Building 371. The primary purpose of the geologic and geotechnical reviews and assessments described herein are to assess the adequacy of the crustal and near surface rock and soil model used in the seismic analysis of Building 371. This review was requested by the RFETS Seismic Evaluation Program. The purpose was to determine the adequacy of data to support the design basis for Building 371, with respect to seismic loading. The objectives required to meet this goal were to: (1) review techniques used to gather data (2) review analysis and interpretations of the data; and (3) make recommendations to gather additional data if required. Where there were questions or inadequacies in data or interpretation, recommendations were made for new data that will support the design basis analysis and operation of Building 371. In addition, recommendations are provided for a geologic and geophysical assessment for a new facility at the Rocky Flats Site.

Maryak, M.E.; Wyatt, D.E.; Bartlett, S.F.; Lewis, M.R.; Lee, R.C.

1995-12-13T23:59:59.000Z

209

DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project Management Institute DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project Management Institute October 23, 2006 - 9:17am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that the Project Management Institute (PMI) has awarded its 2006 Project of the Year to DOE's Rocky Flats Environmental Technology Site. The award was presented to DOE contractor Kaiser-Hill, LLC during the PMI Global Congress Dinner 2006 on Saturday, October 21st, 2006 in Seattle, Washington. "It is a great honor for the Department of Energy's Rocky Flats safe cleanup and closure effort to be recognized with this prestigious award," James Rispoli, Assistant Secretary of Energy for Environmental

210

DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project Management Institute DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project Management Institute October 23, 2006 - 9:17am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that the Project Management Institute (PMI) has awarded its 2006 Project of the Year to DOE's Rocky Flats Environmental Technology Site. The award was presented to DOE contractor Kaiser-Hill, LLC during the PMI Global Congress Dinner 2006 on Saturday, October 21st, 2006 in Seattle, Washington. "It is a great honor for the Department of Energy's Rocky Flats safe cleanup and closure effort to be recognized with this prestigious award," James Rispoli, Assistant Secretary of Energy for Environmental

211

Rocky Mountain Power - Self-Direction Credit Program | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rocky Mountain Power - Self-Direction Credit Program Rocky Mountain Power - Self-Direction Credit Program Rocky Mountain Power - Self-Direction Credit Program < Back Eligibility Agricultural Commercial Industrial Savings Category Other Maximum Rebate 80% Credit: $400,000 per calendar year 50% Credit: $50,000 per calendar year Program Info State Wyoming Program Type Utility Rebate Program Rebate Amount Customers receive credits equal to 50% or 80% of eligible expenses Provider Rocky Mountain Power Rocky Mountain Power offers a Self-Direction Credit program to its industrial and large commercial customers with annual electric usage of more than 5,000,000 kWh or a 1,000 kW peak load. Through this program, customers who pursue self-investments in energy efficiency and related demand-side management projects can receive credits of up to 80% of

212

Company Name Company Name Address Place Zip Sector Product Website  

Open Energy Info (EERE)

TIER TIER Sixth Avenue Seattle Washington Services Assessment and forecasting TIER TIER Sixth Avenue Seattle Washington Services Assessment and forecasting products for wind solar and hydro http www tier com Pacific Northwest Area boro biofuel boro biofuel maiden lane New York New York Biofuels Multi feed stock http borobiofuel com Northeast NY NJ CT PA Area A1 Sun Inc A1 Sun Inc th St Berkeley California Gateway Solar Solar PV Design and Installation http www a1suninc com Bay Area A10 Power A10 Power E Blithedale Ave Mill Valley California Gateway Solar Solar Financing and Integration http www a10power com Bay Area A2BE Carbon Capture LLC A2BE Carbon Capture LLC Panorama Ave Boulder Colorado Biofuels Developing technology for producing valuable fuel and food from CO2 using algal photosynthesis and bio harvesting http www algaeatwork com Rockies Area

213

Idaho Cold War Waste Removal Advancing as Work on Eighth Area...  

NLE Websites -- All DOE Office Websites (Extended Search)

production at the Rocky Flats Plant near Denver, Colorado, and was buried in Idaho from 1954 to 1970. In late 2012, waste exhumation was suspended due to impacts from the...

214

Mixed Waste Focus Area mercury contamination product line: An integrated approach to mercury waste treatment and disposal  

SciTech Connect

The US Department of Energy (DOE) Mixed Waste Focus Area (MWFA) is tasked with ensuring that solutions are available for the mixed waste treatment problems of the DOE complex. During the MWFA`s initial technical baseline development process, three of the top four technology deficiencies identified were related to the need for amalgamation, stabilization, and separation/removal technologies for the treatment of mercury and mercury-contaminated mixed waste. The focus area grouped mercury-waste-treatment activities into the mercury contamination product line under which development, demonstration, and deployment efforts are coordinated to provide tested technologies to meet the site needs. The Mercury Working Group (HgWG), a selected group of representatives from DOE sites with significant mercury waste inventories, is assisting the MWFA in soliciting, identifying, initiating, and managing efforts to address these areas. Based on the scope and magnitude of the mercury mixed waste problem, as defined by HgWG, solicitations and contract awards have been made to the private sector to demonstrate amalgamation and stabilization processes using actual mixed wastes. Development efforts are currently being funded under the product line that will address DOE`s needs for separation/removal processes. This paper discusses the technology selection process, development activities, and the accomplishments of the MWFA to date through these various activities.

Hulet, G.A. [Lockheed Martin Idaho Technologies Co., Idaho Falls, ID (United States); Conley, T.B.; Morris, M.I. [Oak Ridge National Lab., TN (United States)

1998-07-01T23:59:59.000Z

215

ROCKY MOUNTAIN OILFIELD TESTING CENTER PROJECT TEST RESULTS  

NLE Websites -- All DOE Office Websites (Extended Search)

06/97DT15 06/97DT15 RMOTC Test Report Rotary Steerable Stabilizer Smith Drilling and Completions 16740 Hardy Street P. 0. Box 60068 Houston, Texas, 77205-0068 281-443-3370 Leo Giangiacorno, Acting Project Manager Rocky Mountain Oilfield Testing Center December 17, 1997 Introduction Directional drilling is more expensive than vertical drilling. This is due to the high maintenance cost of downhole motors and MWD systems required to control hole trajectory. In addition, directional holes have lower penetration rates due to the poor hole cleaning with a non-rotating string. Down time is often spent orienting tool face to obtain the desired trajectory after tile weight is placed on the bit and the reactive torque of the motor is absorbed by the drill string. Holes drilled in this manner often have a tortuous profile compared to holes drilled with a rotary system, increasing the torque

216

ROCKY MOUNTAIN OILFIELD TESTING CENTER PROJECT TEST RESULTS  

NLE Websites -- All DOE Office Websites (Extended Search)

IMPROVED ELASTOMER COMPOUND FOR IMPROVED ELASTOMER COMPOUND FOR PROGRESSIVE CAVITY PUMPS Cameron Elastomer Technology MARCH 23, 1998 FC9563/96PT17 RMOTC Test Report Number 96PT17 Improved Elastomer Compound for Progressive Cavity Pumps Cameron Elastomer Technology 29501 Katy Fwy Katy, Texas 77494-7801 (281) 391-4615 (281) 391-4640 (fax) David H. Doyle, PE, Project Manager Rocky Mountain Oilfield Testing Center March 23, 1998 Introduction The purpose of this project was to evaluate improved progressing cavity (PC) pump stator elastomer materials in NPR-3 crude under field conditions. The goal of the project was to test an elastomer material that can be used in high API-gravity (greater than 38' API) crude oils. Currently available materials used for the construction of pump stators swell and fail in contact with such crude oils. This limits the applicability of progressing cavity

217

ROCKY MOUNTAIN OILFIELD TESTING CENTER PROJECT TEST RESULTS  

NLE Websites -- All DOE Office Websites (Extended Search)

DYNAMOMETER DYNAMOMETER Sandia National Laboratories FEBRUARY 10, 1998 FC9514 / 95PT6 ROCKY MOUNTAIN OILFIELD TESTING CENTER Sandia Lab Downhole Dynamometer PROJECT TEST RESULTS February 10, 1998 Michael R. Tyler Project Manager Abstract This test involved the use of Downhole Dynamometer Tools (DDT) that were developed by Albert Engineering and the Sandia National Laboratory. The five (5) Downhole Dynamometers (DDT) were installed in the rod string of well 13-A-21 at predetermined intervals. The DDT tools are equipped with strain gauges and programmable clocks. The tools were place in the well and removed after the data had been gathered. The data gathering is pre-programmed to occur when pumped-off conditions are obtained in the well. This information then reflects the true conditions found downhole in a well in a pumped-

218

Symposium on the Nature of Science—Rocky Kolb  

NLE Websites -- All DOE Office Websites (Extended Search)

FIRST SECOND IN THE LIFE OF THE UNIVERSE FIRST SECOND IN THE LIFE OF THE UNIVERSE Rocky Kolb Watch the talk (Running time 51:09) Video in Frame Detached Video Some users have reported problems with the "Video in Frame" option. If you have problems, please try the "Detached Video" option. Requires RealPlayer 7.0 or higher. Get RealPlayer Thirteen billion years ago our universe started with a bang. Today we are gathering the fossil evidence of the very earliest moments of the universe. Our picture of the very beginning of the universe is still incomplete, with outstanding questions like: What powered the big bang? What is the dark matter that binds together the universe? What is the dark energy that thrusts apart the universe? Are there hidden spacetime dimensions? What was before the big bang?

219

Enforcement Letter -Rocky Flats-08/02/2000  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, 2000 , 2000 Mr. Robert G. Card [ ] Kaiser-Hill Company, L.L.C. Rocky Flats Environmental Technology Site 10808 Highway 93, Unit B Golden, CO 80403-8200 Subject: Enforcement Letter Dear Mr. Card: This letter refers to the Department of Energy's (DOE) evaluation of potential noncompliances with the requirements of 10 CFR 830.120 (Quality Assurance Rule). The potential noncompliances involved inadequate implementation of work controls, specifically failure to perform required combustible gas surveillances. The failure to fully perform the required surveillances was identified by the contractor during a comprehensive Kaiser-Hill (KHLL) Implementation Validation Review (IVR) team verifying implementation of the Basis of Interim Operation (BIO) for Buildings 776 and

220

ROCKY MOUNTAIN OILFIELD TESTING CENTER PROJECT TEST RESULTS  

NLE Websites -- All DOE Office Websites (Extended Search)

DYNAMOTER DYNAMOTER Sandia National Laboratories FEBRUARY 10, 1998 FC9542 / 96PT11 ROCKY MOUNTAIN OILFIELD TESTING CENTER Sandia Lab Downhole Dynamometer PROJECT TEST RESULTS February 10, 1998 Michael R. Tyler Project Manager Abstract This test involved the use of Downhole Dynamometer Tools (DDT) that were developed by Albert Engineering and the Sandia National Laboratory. The five (5) Downhole Dynamometers (DDT) were installed in the rod string of well 13-A-21 at predetermined intervals. The DDT tools are equipped with strain gauges and programmable clocks. The tools were place in the well and removed after the data had been gathered. The data gathering is pre-programmed to occur when pumped-off conditions are obtained in the well. This information then reflects the true conditions found downhole in a well in a pumped-off state.

Note: This page contains sample records for the topic "rockies area product" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Enforcement Letter - Rocky Flats -07/20/1998  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, 1998 , 1998 Mr. Robert G. Card [ ] Kaiser-Hill Company, L.L.C. Rocky Flats Environmental Technology Site P.O. Box 464 Golden, CO 80402-0464 Subject: Enforcement Letter Noncompliance Reports NTS-RFO--KHLL-SITEWIDE-1997-0006 NTS-RFO--KHLL-371OPS-1997-0002 NTS-RFO--KHLL-SITEWIDE-1997-0010 NTS-RFO--KHLL-SITEWIDE-1998-0001 Dear Mr. Card: This letter refers to the Department of Energy=s (DOE) evaluation of noncompliances reported in four Noncompliance Tracking System (NTS) entries, identified in the subject line above. The four NTS reports were submitted between September 24, 1997, and March 3, 1998. The reports identified potential noncompliances with requirements of 10 CFR 830.120 (Quality Assurance Rule) and 10 CFR 835 (Radiation Protection Rule). The Office of Enforcement and Investigation evaluated these NTS reports based on the

222

DOE - Office of Legacy Management -- Rocky Flats Petition  

NLE Websites -- All DOE Office Websites (Extended Search)

Petition Petition Rocky Flats Site, Colorado Site-Specific Uranium Standards Petition All documents are Adobe Acrobat files. pdf_icon U.S. Department of Energy's Proponent's Pre-Hearing Statement for Proposed Revisions to Segments 4a, 4b, and 5 of Big Dry Creek (Walnut and Woman Creeks) Regulation #38 (5 CCR 1002-38) Figure 1 Figure 2 Thermal Ionization Mass Spectrometry Uranium Results for November 2008 RFETS Waters Thermal Ionization Mass Spectrometry Uranium Results for September 2008 RFETS Waters Thermal Ionization Mass Spectrometry Uranium Results for October 2007 RFETS Waters Quantitative Evaluation of Mixture Components in RFETS Uranium Isotopic Analyses Proposed Notice Petition for Rulemaking Regarding Site-Specific Uranium Standards Rulemaking Petition Water Monitoring Locations

223

Sitewide risk perspectives for the Rocky Flats Environmental Technology Site  

SciTech Connect

The US Department of Energy (DOE) has recently finalized a closure plan (originally called the Ten Year Plan) for closure and environmental cleanup of previous nuclear weapons facilities. The DOE Rocky Flats Field Office has established priorities for risk reduction work to Support closure activities, as well as addressing those hazards associated with storage and management of radioactive materials and hazardous chemicals. To provide information for future National Environmental Policy Act (NEPA) or other regulatory assessments of specific risk reduction projects identified in the Closure Plan, a risk assessment of normal operations and potential accidents was recently prepared to provide an updated baseline of the cumulative impacts to the worker, public and environment due to the Site`s operations, activities, and environmental conditions in light of the Site`s change in mission, and of future closure projects. This paper summarizes the risk assessment approach, results, and conclusions.

Olinger, S.J. [Dept. of Energy, Golden, CO (United States). Rocky Flats Field Office; Foppe, T.L. [M.H. Chew and Associates, Inc., Golden, CO (United States)

1998-05-01T23:59:59.000Z

224

Sorbent Testing for the Solidification of Unidentified Rocky Flats Laboratory Waste Stored at the Idaho National Laboratory  

Science Conference Proceedings (OSTI)

At the request of the U.S. Department of Energy (DOE), MSE Technology Applications, Inc. (MSE) evaluated various commercially available sorbents to solidify unidentified laboratory liquids from Rocky Flats that are stored at the Idaho National Laboratory (INL). The liquids are a collection of laboratory wastes that were generated from various experiments and routine analytical laboratory activities carried out at Rocky Flats. The liquids are in bottles discovered inside of buried waste drums being exhumed from the subsurface disposal area at the Radioactive Waste Management Complex (RWMC) by the contractor, CH2M Hill Washington International (CWI). Free liquids are unacceptable at the Waste Isolation Pilot Plant (WIPP), and some of these liquids cannot be returned to the retrieval pit. Stabilization of the liquids into a solid mass will allow these materials to be sent to an appropriate disposal location. The selected sorbent or sorbent combinations should produce a stabilized mass that is capable of withstanding conditions similar to those experienced during storage, shipping, and burial. The final wasteform should release less than 1% liquid by volume per the WIPP Waste Acceptance Criteria (WAC). The absence or presence of free liquid in the solidified waste-forms was detected when tested by SW-846, Method 9095B, Paint Filter Free Liquids, and the amount of liquid released from the wasteform was determined by SW-846, Method 9096, Liquid Release Test. Reactivity testing was also conducted on the solidified laboratory liquids. (authors)

Bickford, J. [MSE Technology Applications, Inc., Butte, MT (United States); Kimmitt, R. [CH2M WG Idaho, LLC, Idaho National Laboratory, CF-601, MF-637, MS4201, Scoville, ID (United States)

2007-07-01T23:59:59.000Z

225

Technical progress and community relations activities for the fluidized bed thermal treatment process at the Rocky Flats Plant  

SciTech Connect

A fluidized bed system is being developed at Rocky Flats for the treatment of mixed waste (a mixture of radioactive and chemically hazardous waste). The current program builds on experience gained in the 1970's and 1980's in tests with bench-scale, pilot-scale, and demonstration-scale fluidized bed incinerators. Rocky Flat's fluidized bed system operates at low temperatures ([approximately]525--600[degrees]C) which eliminates many of the disadvantages associated with high temperature thermal treatment processes. The bed makes use of in situ neutralization of acidic off-gases by incorporating either sodium carbonate or a mixture of sodium carbonate and bicarbonate (Trona) in the bed media. This obviates using wet scrubbers to treat the off-gas. It is expected that once in production, the fluidized bed process will yield up to a 40:1 reduction in the volume of the waste feed. The current development program for the full-scale system is a nationwide effort incorporating input from national laboratories, universities, regulatory agencies, and private companies to assure the most current technology is utilized and that regulatory concerns are addressed. In addition to resolving technological issues, the fluidized bed program is addressing public concerns with a proactive community relations program.

Semones, G.B.; Williams, P.M.; Stiefvater, S.P.; Mitchell, D.L.; Roecker, B.D.

1993-01-01T23:59:59.000Z

226

Technical progress and community relations activities for the fluidized bed thermal treatment process at the Rocky Flats Plant  

SciTech Connect

A fluidized bed system is being developed at Rocky Flats for the treatment of mixed waste (a mixture of radioactive and chemically hazardous waste). The current program builds on experience gained in the 1970`s and 1980`s in tests with bench-scale, pilot-scale, and demonstration-scale fluidized bed incinerators. Rocky Flat`s fluidized bed system operates at low temperatures ({approximately}525--600{degrees}C) which eliminates many of the disadvantages associated with high temperature thermal treatment processes. The bed makes use of in situ neutralization of acidic off-gases by incorporating either sodium carbonate or a mixture of sodium carbonate and bicarbonate (Trona) in the bed media. This obviates using wet scrubbers to treat the off-gas. It is expected that once in production, the fluidized bed process will yield up to a 40:1 reduction in the volume of the waste feed. The current development program for the full-scale system is a nationwide effort incorporating input from national laboratories, universities, regulatory agencies, and private companies to assure the most current technology is utilized and that regulatory concerns are addressed. In addition to resolving technological issues, the fluidized bed program is addressing public concerns with a proactive community relations program.

Semones, G.B.; Williams, P.M.; Stiefvater, S.P.; Mitchell, D.L.; Roecker, B.D.

1993-01-01T23:59:59.000Z

227

Rendezvous in the Rockies Pool & Spa Low Temperature Geothermal Facility |  

Open Energy Info (EERE)

Rendezvous in the Rockies Pool & Spa Low Temperature Geothermal Facility Rendezvous in the Rockies Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Rendezvous in the Rockies Pool & Spa Low Temperature Geothermal Facility Facility Rendezvous in the Rockies Sector Geothermal energy Type Pool and Spa Location Buena Vista, Colorado Coordinates 38.8422178°, -106.1311288° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

228

Retail gasoline prices in the Rocky Mountains fall as U.S ...  

U.S. Energy Information Administration (EIA)

... gasoline prices in the Rockies were 41 cents below the U.S. average, which was a record for the region since EIA began tracking regional retail price data in 1992.

229

EA-1120: Solid Residues Treatment, Repackaging and Storage at the Rocky  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Solid Residues Treatment, Repackaging and Storage at the 0: Solid Residues Treatment, Repackaging and Storage at the Rocky Flats Environmental Technology Site, Golden, Colorado EA-1120: Solid Residues Treatment, Repackaging and Storage at the Rocky Flats Environmental Technology Site, Golden, Colorado SUMMARY This EA evaluates the environmental impacts of the proposal to stabilize, if necessary, and/or repackage the residues for safe interim storage at the Site while awaiting the completion and opening of a suitable repository to which they would be shipped for disposal from the U.S. Department of Energy Rocky Flats Environmental Technology Site in Golden, Colorado. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD April 1, 1996 EA-1120: Finding of No Significant Impact Solid Residues Treatment, Repackaging and Storage at the Rocky Flats

230

VWZ-0008 - In the Matter of EG&G Rocky Flats, Inc. | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

VWZ-0008 - In the Matter of EG&G Rocky Flats, Inc. VWZ-0008 - In the Matter of EG&G Rocky Flats, Inc. VWZ-0008 - In the Matter of EG&G Rocky Flats, Inc. This decision will consider a Motion for Partial Dismissal and Limitation on Scope of Complainant's Claims filed by EG&G Rocky Flats, Inc. (EG&G) on June 13, 1997. In its motion, EG&G seeks partial dismissal of the underlying complaint and hearing request filed by Arthur Murfin (Murfin) under the Department of Energy's (DOE) Contractor Employee Protection Program, 10 C.F.R. Part 708. Murfin's request for a hearing under 10 C.F.R. § 708.9 was filed on January 27, 1997, and it has been assigned Office of Hearings and Appeals (OHA) Case No. VWA-0016. vwz0008.pdf More Documents & Publications LWA-0010 - In the Matter of Howard W. Spaletta

231

Comparison and evaluation of turbulence estimation schemes at Rocky Flats Plant  

SciTech Connect

The Rocky Flats Plant (RFP) routinely measures meteorological data to support Air Quality and Emergency Response activities. These data help to characterize the transport and dispersion of actual or potential airborne releases of radionuclides or other hazardous materials.

Bowen, B.M.; Pamp, S.E.

1993-10-01T23:59:59.000Z

232

A Method for Predicting Chinook Winds East of the Montana Rockies  

Science Conference Proceedings (OSTI)

Damaging foehn winds, locally known as chinook winds, are loosely defined and generally described for the east slopes of the Montana Rockies. Three upper-level patterns associated with chinook episodes in Montana are described and illustrated. ...

Michael J. Oard

1993-06-01T23:59:59.000Z

233

The Structure and Evolution of a Simulated Rocky Mountain Lee Trough  

Science Conference Proceedings (OSTI)

This paper describes the life cycle of a lee trough associated with the passage of a baroclinic wave over the Rocky Mountains based on two overlapping simulations by the Pennsylvania State University-National Center for Atmospheric Research ...

W. James Steenburgh; Clifford F. Mass

1994-12-01T23:59:59.000Z

234

Analyzing and Forecasting Rocky Mountain Lee Cyclogenesis Often Associated with Strong Winds  

Science Conference Proceedings (OSTI)

Since numerical forecast models often err in predicting the timing and location of lee cyclogenesis, a physically based method to diagnose such errors is sought. A case of Rocky Mountain lee cyclogenesis associated with strong winds is examined ...

David M. Schultz; Charles A. Doswell III

2000-04-01T23:59:59.000Z

235

The Role of Terrain and Pressure Stresses in Rocky Mountain Lee Cyclones  

Science Conference Proceedings (OSTI)

The earthatmosphere exchange of storm absolute dynamic circulation by mountain-induced surface pressure stress and the response of the circulation in a Rocky Mountain Ice cyclone is examined. Surface pressure stresses that transfer horizontal ...

Alan C. Czarnetzki; Donald R. Johnson

1996-04-01T23:59:59.000Z

236

Cold Fronts Aloft and the Forecasting of Precipitation and Severe Weather East of the Rocky Mountains  

Science Conference Proceedings (OSTI)

Brief descriptions are given of four cases that illustrate the important role that cold fronts aloft (CFA) can play in producing significant weather cast of the Rocky Mountains. In all four cases, the CFA, and its associated short wave, were ...

Peter V. Hobbs; John D. Locatelli; Jonathan E. Martin

1990-12-01T23:59:59.000Z

237

Annual Snowpack Patterns across the Rockies: Long-Term Trends and Associated 500-mb Synoptic Patterns  

Science Conference Proceedings (OSTI)

Winter snowpack was investigated to determine spatial and temporal climate variability in a five-state region (Colorado, Idaho, Montana, Utah, and Wyoming) in the northern Rocky Mountains, covering the period 195185. Annual 1 April snowpack (SN) ...

David Changnon; Thomas B. McKee; Nolan J. Doesken

1993-03-01T23:59:59.000Z

238

Two Case Studies of Wintertime Cloud Systems over the Colorado Rockies  

Science Conference Proceedings (OSTI)

The economical importance of the winter snowpack to the Colorado Rocky Mountain region (e.g., weather modification potential, ski industry, avalanche prediction, snow removal, etc.) calls for an understanding of how the mountain environment and ...

Robert R. Lee

1984-03-01T23:59:59.000Z

239

Characteristics of Supercooled Liquid Water in Clouds at Mountaintop Sites in the Colorado Rockies  

Science Conference Proceedings (OSTI)

Observations and measurements were made of supercooled liquid water in clouds which enveloped high elevation sites in the Colorado Rocky Mountains for the winters of 1980/81 through 1983/84. The observations showed that liquid water was more ...

Edward E. Hindman

1986-09-01T23:59:59.000Z

240

Climatic Controls on the Snowmelt Hydrology of the Northern Rocky Mountains  

Science Conference Proceedings (OSTI)

The northern Rocky Mountains (NRMs) are a critical headwaters region with the majority of water resources originating from mountain snowpack. Observations showing declines in western U.S. snowpack have implications for water resources and ...

Gregory T. Pederson; Stephen T. Gray; Toby Ault; Wendy Marsh; Daniel B. Fagre; Andrew G. Bunn; Connie A. Woodhouse; Lisa J. Graumlich

2011-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "rockies area product" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

The Detection and Significance of Diurnal Pressure and Potential Vorticity Anomalies East of the Rockies  

Science Conference Proceedings (OSTI)

Harmonic analysis of pressure, temperature, and precipitation data from 1000 Automated Surface Observing System (ASOS) stations reveals a mix of stationary and eastwest moving disturbances east of the Rockies. Optimization of the pressure data ...

Yanping Li; Ronald B. Smith

2010-09-01T23:59:59.000Z

242

The Structure and Evolution of Cold Surges East of the Rocky Mountains  

Science Conference Proceedings (OSTI)

Northerly surges of cold air often move southward along the eastern side of the Rockies from southern Canada into Mexico. The strongest surges, which generally develop in midwinter, are associated with temperature decreases and pressure rises of ...

Brian A. Colle; Clifford F. Mass

1995-09-01T23:59:59.000Z

243

Area Solar energy production BACKGROUND -All renewable energies, except for geothermal and tidal, derive their energy from the sun. By harnessing the power of  

E-Print Network (OSTI)

Area Solar energy production ­ BACKGROUND - All renewable energies installations. Advantages: · A renewable form of energy - "Locks up" carbon, except for geothermal and tidal, derive their energy from the sun

Keinan, Alon

244

Area wind farm energy production BACKGROUND -In Central New York State, home of the New York State Fair, wind turbine construction has had a noticeable  

E-Print Network (OSTI)

Area wind farm energy production ­ BACKGROUND - In Central New York State, home of the New York State Fair, wind turbine construction has they are then trucked to their destinations, and quite a few wind farms dot the hills. One

Keinan, Alon

245

Idaho National Engineering Laboratory code assessment of the Rocky Flats transuranic waste  

SciTech Connect

This report is an assessment of the content codes associated with transuranic waste shipped from the Rocky Flats Plant in Golden, Colorado, to INEL. The primary objective of this document is to characterize and describe the transuranic wastes shipped to INEL from Rocky Flats by item description code (IDC). This information will aid INEL in determining if the waste meets the waste acceptance criteria (WAC) of the Waste Isolation Pilot Plant (WIPP). The waste covered by this content code assessment was shipped from Rocky Flats between 1985 and 1989. These years coincide with the dates for information available in the Rocky Flats Solid Waste Information Management System (SWIMS). The majority of waste shipped during this time was certified to the existing WIPP WAC. This waste is referred to as precertified waste. Reassessment of these precertified waste containers is necessary because of changes in the WIPP WAC. To accomplish this assessment, the analytical and process knowledge available on the various IDCs used at Rocky Flats were evaluated. Rocky Flats sources for this information include employee interviews, SWIMS, Transuranic Waste Certification Program, Transuranic Waste Inspection Procedure, Backlog Waste Baseline Books, WIPP Experimental Waste Characterization Program (headspace analysis), and other related documents, procedures, and programs. Summaries are provided of: (a) certification information, (b) waste description, (c) generation source, (d) recovery method, (e) waste packaging and handling information, (f) container preparation information, (g) assay information, (h) inspection information, (i) analytical data, and (j) RCRA characterization.

1995-07-01T23:59:59.000Z

246

Rocky Flats 10 year plan: over 500 structures to be demolished  

Science Conference Proceedings (OSTI)

Rocky Flats Environmental Technology Site has prepared a Ten Year Plan (Plan) that demonstrates how the Site would achieve accelerated cleanup and rapidly reduce the risks the Site currently poses to its workers, the public, and the environment. A major element of the Plan is the decontamination and demolition of over 500 Site facilities, including all of the former nuclear production facilities, by the end of 2006. Facilities used for the storage of plutonium, treatment of low-level mixed waste, and several office building would remain until the plutonium is removed or there is no longer a need for the facility, in which case it would be demolished. While the Plan considers all aspects of the cleanup and closure, this paper focuses on the challenges posed by the removal of highly contaminated equipment and the demolition of structures. This paper describes near- term decommissioning projects as well as the long range plans and budgets. Cash flow ultimately controls schedule, and sharing of budget priorities among processing of special nuclear material, disposing of waste, and cleaning up the environment has to be juggled carefully to attain the goals of the Plan. The total cost of the Plan exceeds $5 billion, and over $1 billion will be spent on decommissioning activities. Following removal of the plutonium and the demolition of the plutonium storage and remaining Site facilities by the end of 2015, the cost to perform the long-term environmental monitoring at the Site is estimated to be $10 million per year.

Evans, B. [Kaiser-Hill L.L.C., Rocky Flats, CO (United States); Bengel, P. [Rocky Mountain Remediation Services, L.L.C., Rocky Flats, CO (United States)

1997-03-01T23:59:59.000Z

247

Project Fever - Fostering Electric Vehicle Expansion in the Rockies  

DOE Green Energy (OSTI)

Project FEVER (Fostering Electric Vehicle Expansion in the Rockies) is a part of the Clean Cities Community Readiness and Planning for Plug-in Electric Vehicles and Charging Infrastructure Funding Opportunity funded by the U.S. Department of Energy (DOE) for the state of Colorado. Tasks undertaken in this project include: Electric Vehicle Grid Impact Assessment; Assessment of Electrical Permitting and Inspection for EV/EVSE (electric vehicle/electric vehicle supply equipment); Assessment of Local Ordinances Pertaining to Installation of Publicly Available EVSE;Assessment of Building Codes for EVSE; EV Demand and Energy/Air Quality Impacts Assessment; State and Local Policy Assessment; EV Grid Impact Minimization Efforts; Unification and Streamlining of Electrical Permitting and Inspection for EV/EVSE; Development of BMP for Local EVSE Ordinances; Development of BMP for Building Codes Pertaining to EVSE; Development of Colorado-Specific Assessment for EV/EVSE Energy/Air Quality Impacts; Development of State and Local Policy Best Practices; Create Final EV/EVSE Readiness Plan; Develop Project Marketing and Communications Elements; Plan and Schedule In-person Education and Outreach Opportunities.

Swalnick, Natalia

2013-06-30T23:59:59.000Z

248

Fuel Ethanol Oxygenate Production  

Gasoline and Diesel Fuel Update (EIA)

Product: Fuel Ethanol Methyl Tertiary Butyl Ether Merchant Plants Captive Plants Period-Unit: Monthly-Thousand Barrels Monthly-Thousand Barrels per Day Annual-Thousand Barrels Annual-Thousand Barrels per Day Product: Fuel Ethanol Methyl Tertiary Butyl Ether Merchant Plants Captive Plants Period-Unit: Monthly-Thousand Barrels Monthly-Thousand Barrels per Day Annual-Thousand Barrels Annual-Thousand Barrels per Day Download Series History Download Series History Definitions, Sources & Notes Definitions, Sources & Notes Show Data By: Product Area May-13 Jun-13 Jul-13 Aug-13 Sep-13 Oct-13 View History U.S. 27,197 26,722 26,923 26,320 25,564 27,995 1981-2013 East Coast (PADD 1) 628 784 836 842 527 636 2004-2013 Midwest (PADD 2) 25,209 24,689 24,786 24,186 23,810 26,040 2004-2013 Gulf Coast (PADD 3) 523 404 487 460 431 473 2004-2013 Rocky Mountain (PADD 4) 450 432 430 432 415 429 2004-2013 West Coast (PADD 5)

249

A decision analysis method for selection of waste minimization process options for TRU mixed material at Rocky Flats  

Science Conference Proceedings (OSTI)

When plutonium production operations were halted at the Rocky Flats Plant, there remained a volume of material that was retained in order that its plutonium content could be reclaimed. This material, known as residue, is transuranic and mixed transuranic material with a plutonium content above what was called the ``economic discard limit,`` or EDL. The EDL was defined in terms of each type of residue material, and each type of material is given an Item Description Code, or IDC. Residue IDCs have been grouped into general category descriptions which include plutonium (Pu) nitrate solutions, Pu chloride solutions, salts, ash, metal, filters, combustibles, graphite, crucibles, glass, resins, gloves, firebrick, and sludges. Similar material exists both below and above the EDL, with material with the (previous) economic potential for reclamation of plutonium classified as residue.

Williams, R.E.; Dustin, D.F.

1994-02-01T23:59:59.000Z

250

East Coast (PADD 1) Imports of Crude Oil and Petroleum Products for  

Gasoline and Diesel Fuel Update (EIA)

Area: East Coast (PADD 1) Midwest (PADD 2) Gulf Coast (PADD 3) Rocky Mountain (PADD 4) West Coast (PADD 5) Period-Unit: Monthly-Thousand Barrels Monthly-Thousand Barrels per Day Annual-Thousand Barrels Annual-Thousand Barrels per Day Area: East Coast (PADD 1) Midwest (PADD 2) Gulf Coast (PADD 3) Rocky Mountain (PADD 4) West Coast (PADD 5) Period-Unit: Monthly-Thousand Barrels Monthly-Thousand Barrels per Day Annual-Thousand Barrels Annual-Thousand Barrels per Day Download Series History Download Series History Definitions, Sources & Notes Definitions, Sources & Notes Show Data By: Product Area May-13 Jun-13 Jul-13 Aug-13 Sep-13 Oct-13 View History Total 60,122 54,018 52,671 54,668 52,999 47,100 1981-2013 Crude Oil 27,587 25,670 24,699 27,070 27,065 18,146 1981-2013 Total Products 32,535 28,348 27,972 27,598 25,934 28,954 1995-2013 Other Liquids 24,957 20,056 20,754 17,137 16,653 17,339 1981-2013 Unfinished Oils 4,375 2,077 2,253 1,874 1,960 1,500 1981-2013

251

Categorical Exclusion Determinations: Western Area Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 19, 2011 May 19, 2011 CX-005981: Categorical Exclusion Determination Curecanti Substation Containment Wall, Montrose County, Colorado CX(s) Applied: B1.6 Date: 05/19/2011 Location(s): Montrose County, Colorado Office(s): Western Area Power Administration-Rocky Mountain Region May 18, 2011 CX-005937: Categorical Exclusion Determination Boyd-Valley Transmission Line Optical Ground Wire Fiber Optic Installation, Larimer County, Colorado CX(s) Applied: B4.7 Date: 05/18/2011 Location(s): Larimer County, Colorado Office(s): Western Area Power Administration-Rocky Mountain Region May 17, 2011 CX-006244: Categorical Exclusion Determination Craig-Bears Ears-Hayden Substations Fiber Optic and Pole Installation, Moffat and Routt Counties, Colorado CX(s) Applied: B4.6, B4.7 Date: 05/17/2011

252

Categorical Exclusion Determinations: Western Area Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 25, 2012 July 25, 2012 CX-008787: Categorical Exclusion Determination Midway Substation 230 Kilovolt Upgrades El Paso County, Colorado CX(s) Applied: B4.6, B4.11 Date: 07/25/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region July 23, 2012 CX-008784: Categorical Exclusion Determination License Outgrant to Owl Creek Water District Town of Thermopolis, Hot Springs County, Wyoming CX(s) Applied: B4.9 Date: 07/23/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region July 3, 2012 CX-008779: Categorical Exclusion Determination Curecanti-Poncha-Canon City West-Midway 230-Kilovolt Transmission Line Road Maintenance Gunnison, Chaffee, Fremont, Pueblo, and El Paso Counties, Colorado CX(s) Applied: B1.3

253

FINAL REPORT FORMER RADIATION WORKER MEDICAL SURVEILLANCE PROGRAM AT ROCKY FLATS For Department of Energy Programs  

SciTech Connect

The Former Radiation Worker Medical Surveillance Program at Rocky Flats was conducted in Arvada, CO, by Oak Ridge Associated Universities through the Oak Ridge Institute for Science and Education under DOE Contract DE-AC05-00OR22750. Objectives of the program were to obtain information on the value of medical surveillance among at-risk former radiation workers and to provide long-term internal radiation dosimetry information to the scientific community. This program provided the former radiation workers of the Rocky Flats Environmental Technology Site (formerly Rocky Flats Plant) an opportunity to receive follow-up medical monitoring and a re-evaluation of their internal radiation dose. The former Rocky Flats radiation worker population is distinctive because it was a reasonably stable work force that received occupational exposures, at times substantial, over several decades. This report reflects the summation of health outcomes, statistical analyses, and dose assessment information on former Rocky Flats radiation workers to the date of study termination as of March 2004.

Joe M. Aldrich

2004-11-01T23:59:59.000Z

254

Climatological lightning characteristics of the Southern Rocky and Appalachian Mountain chains, a comparison of two distinct mountain effects  

E-Print Network (OSTI)

This study presents a high-resolution lightning climatology for southern portions of both the Rocky Mountains and the Appalachian Mountains. Data from the National Lightning Detection Network (NLDN) are analyzed to produce maps of average annual lightning flash density, positive flash density, percent positive flashes, median peak current, and multiplicity. Three-hourly increments are used to demonstrate the annual average diurnal evolution of flash density. Data are also divided into seasonal averages for the same three-hourly increments to describe the daily evolution of flash density for each of the four seasons: December-January-February, March-April-May, June-July-August, and September-October-November. The flash density analyses reveal opposite mountain-valley effects. In the Rocky Mountains, flash density enhancements occur over and near mountains and flash density minima occur in the valleys. In the Appalachians, the enhancements occur in the valleys, while minimums are noted over the mountains. The eastern edge of the Appalachian lightning suppression is determined to be a result of faster propagation of mountain-initiated convection. Weaker mountain breezes in the Appalachians are theorized to be the catalysts for this. The western edge of the suppression is the cumulative effect of consistent flash density gradients at the Appalachian's western slopes. A theory is presented which links this gradient to observations of high median peak currents. Statistical tests on flash density means show that the Appalachian suppression is significant. Multiple regressions predict lightning flash density from terrain characteristics. Vertical wind and thermodynamic profiles, horizontal temperature differences at summit levels, and average annual precipitation complete the study. From these data, a conceptual model is presented to describe the nature of the lightning evolution in each region, and explain the processes that lead to the end state. This study concludes that the differences between the patterns of lightning characteristics in the Southern Rockies and the Southern Appalachians are the cumulative effects of subtle differences in the diurnal evolution patterns. Furthermore, the Appalachian lightning suppression is a product of lightning propagation and storm evolution, rather than a suppression of convective initiation.

Phillips, Stephen Edward

2001-01-01T23:59:59.000Z

255

HOW THE ROCKY FLATS ENVIRONMENTAL TECHNOLOGY SITE DEVELOPED A NEW WASTE PACKAGE USING A POLYUREA COATING THAT IS SAFELY AND ECONOMICALLY ELIMINATING SIZE REDUCTION OF LARGE ITEMS  

SciTech Connect

One of the major challenges involved in closing the Rocky Flats Environmental Technology Site (RFETS) is the disposal of extremely large pieces of contaminated production equipment and building debris. Past practice has been to size reduce the equipment into pieces small enough to fit into approved, standard waste containers. Size reducing this equipment is extremely expensive, and exposes workers to high-risk tasks, including significant industrial, chemical, and radiological hazards. RFETS has developed a waste package using a Polyurea coating for shipping large contaminated objects. The cost and schedule savings have been significant.

Dorr, Kent A.; Hogue, Richard S.; Kimokeo, Margaret K.

2003-02-27T23:59:59.000Z

256

EA-1120: Solid Residues Treatment, Repackaging and Storage at the Rocky  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

20: Solid Residues Treatment, Repackaging and Storage at the 20: Solid Residues Treatment, Repackaging and Storage at the Rocky Flats Environmental Technology Site, Golden, Colorado EA-1120: Solid Residues Treatment, Repackaging and Storage at the Rocky Flats Environmental Technology Site, Golden, Colorado SUMMARY This EA evaluates the environmental impacts of the proposal to stabilize, if necessary, and/or repackage the residues for safe interim storage at the Site while awaiting the completion and opening of a suitable repository to which they would be shipped for disposal from the U.S. Department of Energy Rocky Flats Environmental Technology Site in Golden, Colorado. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD April 1, 1996 EA-1120: Finding of No Significant Impact

257

Public distrust and hazard management success at the Rocky Flats nuclear weapons plant  

SciTech Connect

Based on experience gained while serving a public oversight commission appointed by the governor of Colorado, hazard management at the Department of Energy's Rocky Flats nuclear weapons plant is reviewed. Specific reference is made to the plant's history of controversy, its defense-in-depth strategy of hazard control, occupational health issues, public exposure to plutonium, and the assessment of low-probability, high-consequence risks. This leads to the conclusion that Rocky flats is, by any objective standard, a hazard management success. It follows that public distrust of Rocky Flats arises as much from fear and loathing of nuclear weapons themselves as from the manufacturing process by which they are made.

Hohenemser, C.

1987-06-01T23:59:59.000Z

258

Impacts of human trampling and periodic sand inundation on Southern California intertidal algal turf communities : implications for conservation and management of rocky shores  

E-Print Network (OSTI)

associated with rocky shore algae. Pgs. 36- 56 in: P.G.associated with rocky shore algae. In: P. G. Moore & R.h. Boulder Boulder / Turf Other Algae Sand > 50 mm, < 200 mm

Huff, Tonya Michelle

2006-01-01T23:59:59.000Z

259

First semiannual report: Rocky Flats Small Wind Systems Test Center activities. Volume I. Description of the National Small Wind Systems Test Center  

DOE Green Energy (OSTI)

Information is presented concerning the Rocky Flats wind turbine test site; the philosophy of testing at Rocky Flats; test procedure development; atmospheric SWECS testing; SWECS component testing; data collection, handling, and analysis; reporting procedures; and future plans.

None

1978-09-28T23:59:59.000Z

260

Large-area, triple-junction a-Si alloy production scale-up. Semiannual subcontract report, 17 March 1994--18 September 1994  

DOE Green Energy (OSTI)

This report describes work performed under a 3-y subcontract to advance Solarex`s photovoltaic manufacturing technologies, reduce its a-Si:H module production costs, increase module performance, and expand the Solarex commercial production capacity. During this period, Solarex focused on improving deposition of the front contact, investigating alternate feedstocks for the front contact, maximizing throughput and area utilization for all laser scribes, optimizing a-Si:H deposition equipment to achieve uniform deposition over large areas, optimizing the triple-junction module fabrication process, evaluating the materials to deposit the rear contact, and optimizing the combination of isolation scribe and encapsulant to pass the wet high potential test.

Oswald, R.; Morris, J. [Solarex Corp., Newtown, PA (United States). Thin Film Div.

1995-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "rockies area product" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Evaluation of using cyclocranes to support drilling & production of oil & gas in wetland areas. Sixth quarterly technical progress report, incorporating milestone schedule/status, October 1993--December 1993  

Science Conference Proceedings (OSTI)

This report is a progress report on a planned program falling under wetlands area research related to drilling, production, and transportation of oil and gas resources. Specifically the planned program addresses an evaluation of using cyclocraft to transport drill rigs, mud, pipes and other materials and equipment in a cost effective and environmentally safe manner to support oil and gas drilling and production operations in wetland areas. During this period, task 5, subscale tests, and task 7, environmental impacts, were completed. Work was continued on task 10, technology transfer, and the preparation of the final report as part of task 11.

Eggington, W.J.

1994-04-01T23:59:59.000Z

262

Evaluation of an emergency response model for the Rocky Flats Plant: Charter  

Science Conference Proceedings (OSTI)

This Charter provides a basis for a cooperative, interagency effort to evaluate the Terrain-Responsive Atmospheric Code for emergency response and emergency planning for the Rocky Flats Plant. This document establishes the foundation for the project entitled, Evaluation of an Emergency Response Model for the Rocky Flats Plant'' (to be referred to as the Project). This document meets the following objectives: Identify the Project; establish the project management structure, organizational responsibilities, and organizational commitments for reaching the goals of the Project, and identify a process for model revision and revelation for acceptance. 2 figs.

Not Available

1991-01-01T23:59:59.000Z

263

Understanding Contaminant Transport Pathways at Rocky Flats - A Basis for the Remediation Strategy  

SciTech Connect

The Rocky Flats Environmental Technology Site (RFETS) is a Department of Energy facility located approximately 16 miles northwest of Denver, Colorado. Processing and fabrication of nuclear weapons components occurred at Rocky Flats from 1952 through 1989. Operations at the Site included the use of several radionuclides, including plutonium-239/240 (Pu), americium-241 (Am), and various uranium (U) isotopes, as well as several types of chlorinated solvents. The historic operations resulted in legacy contamination, including contaminated facilities, process waste lines, buried wastes and surface soil contamination. Decontamination and removal of buildings at the site was completed in late 2005, culminating more than ten years of active environmental remediation work. The Corrective Action Decision/Record of Decision was subsequently approved in 2006, signifying regulatory approval and closure of the site. The use of RFETS as a National Wildlife Refuge is scheduled to be in full operation by 2012. To develop a plan for remediating different types of radionuclide contaminants present in the RFETS environment required understanding the different environmental transport pathways for the various actinides. Developing this understanding was the primary objective of the Actinide Migration Evaluation (AME) project. Findings from the AME studies were used in the development of RFETS remediation strategies. The AME project focused on issues of actinide behavior and mobility in surface water, groundwater, air, soil and biota at RFETS. For the purposes of the AME studies, actinide elements addressed included Pu, Am, and U. The AME program, funded by DOE, brought together personnel with a broad range of relevant expertise in technical investigations. The AME advisory panel identified research investigations and approaches that could be used to solve issues related to actinide migration at the Site. An initial step of the AME was to develop a conceptual model to provide a qualitative description of the relationships among potential actinide sources and transport pathways at RFETS. One conceptual model was developed specifically for plutonium and americium, because of their similar geochemical and transport properties. A separate model was developed for uranium because of its different properties and mobility in the environment. These conceptual models were guidelines for quantitative analyses described in the RFETS Pathway Analysis Report, which used existing data from the literature as well as site-specific analyses, including field, laboratory and modeling studies to provide quantitative estimates of actinide migration in the RFETS environment. For pathways where more than one method was used to estimate offsite loads for a specific pathway, the method yielding the highest estimated off-site was used for comparison purposes. For all actinides studied, for pre-remediation conditions, air and surface water were identified to be the dominant transport mechanisms. The estimated annual airborne plutonium-239/240 load transported off site exceeded the surface water load by roughly a factor of 40. However, despite being the largest transport pathway, airborne radionuclide concentrations at the monitoring location with the highest measurements during the period studied were less than two percent of the allowable 10 milli-rem standard governing DOE facilities. Estimated actinide loads for other pathways were much less. Shallow groundwater was approximately two orders of magnitude lower, or 1/100 of the load conveyed in surface water. The estimated biological pathway load for plutonium was approximately five orders of magnitude less, or 1/100,000, of the load estimated for surface-water. The pathway analysis results were taken into consideration during subsequent remediation activities that occurred at the site. For example, when the 903 Pad area was remediated to address elevated concentrations of Pu and Am in the surface soil, portable tent structures were constructed to prevent wind and water erosion from occurring while remediation activitie

Paton, Ian [Wright Water Engineers, Inc.: 2490 W. 26th Avenue, Suite 100A, Denver, CO 80211 (United States)

2008-01-15T23:59:59.000Z

264

Cerebral extraction of N-13 ammonia: its dependence on cerebral blood flow and capillary permeability, surface area product. [Dogs; monkeys  

SciTech Connect

/sup 13/N-labeled ammonia was used to investigate: (1) the cerebral extraction and clearance of ammonia; (2) the mechanicsm by which capillaries accommodate changes in cerebral blood flow (CBF); and (3) its use for the measure of CBF. This was investigated by measuring the single pass extraction of /sup 13/NH/sub 3/ in rhesus monkeys during P/sub a/CO/sub 2/ induced changes in CBF, and with dog studies using in vitro tissue counting techniques to examine /sup 13/NH/sub 3/ extraction in gray and white matter, mixed tissue, and cerebellum during variations in CBF produced by combinations of embolization, local brain compression, and changes in P/sub a/CO/sub 2/. The single pass extraction fraction of /sup 13/NH/sub 3/ varied from about 70 to 20% over a CBF range of 12 to 140cc/min/100gms. Capillary permeability-surface area product (PS) estimates from this data and the dog experiments show PS increasing with CBF. The magnitude and rate of increase in PS with CBF was highest in gray matter > mixed tissue > white matter. Tissue extraction of /sup 13/NH/sub 3/ vs CBF relationship was best described by a unidirectional transport model in which CBF increases by both recruitment of capillaries and by increases of blood velocity in open capillaries. Glutamine synthetase, which incorporates /sup 13/NH/sub 3/ into glutamine, appears to be anatomically located in astrocytes in general and specifically in the astrocytic pericapillary end-feet that are in direct contact with gray and white matter capillaries. The net /sup 13/NH/sub 3/ extraction subsequent to an i.v. injection increases nonlinearly with CBF. Doubling or halving basal CBF produced from 40 to 50% changes in the /sup 13/N tissue concentrations with further increases in CBF associated with progressively smaller changes in /sup 13/N concentrations. /sup 13/NH/sub 3/ appears to be a good tracer for the detection of cerebral ischemia with positron tomography but exhibits a poor response at high values of CBF.

Phelps, M.E.; Huang, S.C.; Kuhl, D.E.; Hoffman, E.J.; Slin, C.

1979-01-01T23:59:59.000Z

265

Rocky Flats, Colorado, Site Quarterly Report of Site Surveillance...  

Office of Legacy Management (LM)

Doc. No. S11334 Page v Abbreviations Am americium AOC Area of Concern CADROD Corrective Action DecisionRecord of Decision CDPHE Colorado Department of Public Health and...

266

SOUTHEAST WASHINGTON SUBBASIN PLANNING ECOREGION WILDLIFE ASSESSMENT F-62 Rocky Mountain Mule Deer  

E-Print Network (OSTI)

. USDA . Monthly Contract Report. 1986-2005. Farm Services Agency. U.S. Dept. Agriculture. Washington D 1978; Goggans 1986; Howie and Ritchie 1987; Reynolds and Linkhart 1992; Powers et al. 1996). In centralSOUTHEAST WASHINGTON SUBBASIN PLANNING ECOREGION WILDLIFE ASSESSMENT F-62 Rocky Mountain Mule Deer

267

Tools for Closure Project and Contract Management: Development of the Rocky Flats Integrated Closure Project Baseline  

Science Conference Proceedings (OSTI)

This paper details the development of the Rocky Flats Integrated Closure Project Baseline - an innovative project management effort undertaken to ensure proactive management of the Rocky Flats Closure Contract in support of the Department's goal for achieving the safe closure of the Rocky Flats Environmental Technology Site (RFETS) in December 2006. The accelerated closure of RFETS is one of the most prominent projects within the Department of Energy (DOE) Environmental Management program. As the first major former weapons plant to be remediated and closed, it is a first-of-kind effort requiring the resolution of multiple complex technical and institutional challenges. Most significantly, the closure of RFETS is dependent upon the shipment of all special nuclear material and wastes to other DOE sites. The Department is actively working to strengthen project management across programs, and there is increasing external interest in this progress. The development of the Rocky Flats Integrated Closure Project Baseline represents a groundbreaking and cooperative effort to formalize the management of such a complex project across multiple sites and organizations. It is original in both scope and process, however it provides a useful precedent for the other ongoing project management efforts within the Environmental Management program.

Gelles, C. M.; Sheppard, F. R.

2002-02-26T23:59:59.000Z

268

Radiological/Health physics program assessement at Rocky Flats, the process  

SciTech Connect

The Department of Energy, Rocky Flats Office, Safety and Health Group, Health Physics Team (HPT) is responsible for oversight of the Radiation Protection and Health Physics Program (RPHP) of the Integrating Management Contractor (IMC), Kaiser-Hill (K-H) operations at the Rocky Flats Environmental Technology Site (RFETS). As of 1 January 1996 the Rocky Flats Plant employed 300 DOE and 4,300 contractor personnel (K-H and their subcontractors). WSI is a subcontractor and provides plant security. To accomplish the RPHP program oversight HPT personnel developed a systematic methodology for performing a functional RPHP Assessment. The initial process included development of a flow diagram identifying all programmatic elements and assessment criteria documents. Formulation of plans for conducting interviews and performance of assessments constituted the second major effort. The generation of assessment reports was the final step, based on the results of this process. This assessment will be a 6 person-year effort, over the next three years. This process is the most comprehensive assessment of any Radiation Protection and Health Physics (RPHP) Program ever performed at Rocky Flats. The results of these efforts will establish a baseline for future RPHP Program assessments at RFETS. This methodology has been well-received by contractor personnel and creates no Privacy Act violations or other misunderstandings.

Psomas, P.O. [Department of Energy, Golden, CO (United States)

1996-06-01T23:59:59.000Z

269

Rocky Mountain (PADD 4) Ending Stocks of Natural Gas Liquids and ...  

U.S. Energy Information Administration (EIA)

View History: Monthly Annual : Download Data (XLS File) Rocky ... 1,900: 2000's: 1,774: 1,914: 2,139: 1,916: 1,611: 1,553: 1,549: 1,503: 1,418: 1,513: 2010's: 1,435 ...

270

Landscape and Urban Planning 71 (2005) 263275 Bird communities of the Colorado Rocky Mountains  

E-Print Network (OSTI)

at each survey point and derived digital land-cover maps from aerial photographs to characterizeLandscape and Urban Planning 71 (2005) 263­275 Bird communities of the Colorado Rocky Mountains and Graduate Degree Program in Ecology, Colorado State University, Fort Collins, CO 80523, USA Received 11

Fraterrigo, Jennifer

271

Factors Affecting Cold-Air Outbreaks East of the Rocky Mountains  

Science Conference Proceedings (OSTI)

A two-layer isentropic model is used to examine the parameters controlling the severity of cold-air outbreaks east of the Rocky Mountains, and in particular the channeling effect of the mountain range. The case that is scrutinized is the cold-air ...

Gisela Hartjenstein; Rainer Bleck

1991-09-01T23:59:59.000Z

272

Norwegian-Type and Cold Front AloftType Cyclones East of the Rocky Mountains  

Science Conference Proceedings (OSTI)

Conventional data and mesoscale model simulations are used to analyze two cyclones that developed east of the Rocky Mountains in June and November 1998. Both cyclones formed when a Pacific cold front overtook a lee trough/dryline east of the ...

John D. Locatelli; Ralph D. Schwartz; Mark T. Stoelinga; Peter V. Hobbs

2002-02-01T23:59:59.000Z

273

A Review of New Multilateral Technology at the Rocky Mountain...  

NLE Websites -- All DOE Office Websites (Extended Search)

injection and EOR facilities is provided in accordance with DOE's "Domestic Natural Gas and Oil Initiative" which allows "new applications that lead to increased production,...

274

Rocky Flats CAAS System Recalibrated, Retested, and Analyzed to Install in the Criticality Experiments Facility at the Nevada Test Site  

Science Conference Proceedings (OSTI)

Neutron detectors and control panels transferred from the Rocky Flats Plant (RFP) were recalibrated and retested for redeployment to the CEF. Testing and calibration were successful with no failure to any equipment. Detector sensitivity was tested at a TRIGA reactor, and the response to thermal neutron flux was satisfactory. MCNP calculated minimum fission yield ({approx} 2 x 10{sup 15} fissions) was applied to determine the thermal flux at selected detector positions at the CEF. Thermal flux levels were greater than 6.39 x 10{sup 6} (n/cm{sup 2}-sec), which was about four orders of magnitude greater than the minimum alarm flux. Calculations of detector survivable distances indicate that, to be out of lethal area, a detector needs to be placed greater than 15 ft away from a maximum credible source. MCNP calculated flux/dose results were independently verified by COG. CAAS calibration and the testing confirmed that the RFP CAAS system is performing its functions as expected. New criteria for the CAAS detector placement and 12-rad zone boundaries at the CEF are established. All of the CAAS related documents and hardware have been transferred from LLNL to NSTec for installation at the CEF high bay areas.

Kim, S; Heinrichs, D; Biswas, D; Huang, S; Dulik, G; Scorby, J; Boussoufi, M; Liu, B; Wilson, R

2009-05-27T23:59:59.000Z

275

Finding of no significant impact. Consolidation and interim storage of special nuclear material at Rocky Flats Environmental Technology Site  

Science Conference Proceedings (OSTI)

The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA -- 1060, for the consolidation, processing, and interim storage of Category I and II special nuclear material (SNM) in Building 371 at the Rocky Flats Environmental Technology Site (hereinafter referred to as Rocky Flats or Site), Golden, Colorado. The scope of the EA included alternatives for interim storage including the no action alternative, the construction of a new facility for interim storage at Rocky Flats, and shipment to other DOE facilities for interim storage.

NONE

1995-06-01T23:59:59.000Z

276

Study of Reservoir Heterogencities and Structural Features Affecting Production in the Shallow Oil Zone, Eastern Elk Hills Area, California  

Science Conference Proceedings (OSTI)

Late Neogene (Plio-Pleistocene) shallow marine strata of the western Bakersfield Arch and Elk Hills produce hydrocarbons from several different reservoirs. This project focuses on the shallow marine deposits of the Gusher and Calitroleum reservoirs in the Lower Shallow Oil Zone (LSOZ). In the eastern part of the study area on the Bakersfield Arch at North and South Coles Levee field and in two wells in easternmost Elk Hills, the LSOZ reservoirs produce dry (predominantly methane) gas. In structurally higher locations in western Elk Hills, the LSOZ produces oil and associated gas. Gas analyses show that gas from the eastern LSOZ is bacterial and formed in place in the reservoirs, whereas gas associated with oil in the western part of the study area is thermogenic and migrated into the sands from deeper in the basin. Regional mapping shows that the gas-bearing LSOZ sands in the Coles Levee and easternmost Elk Hills area are sourced from the Sierra Nevada to the east whereas the oil-bearing sands in western Elk Hills appear to be sourced from the west. The eastern Elk Hills area occupied the basin depocenter, farthest from either source area. As a result, it collected mainly low-permeability offshore shale deposits. This sand-poor depocenter provides an effective barrier to the updip migration of gases from east to west. The role of small, listric normal faults as migration barriers is more ambiguous. Because our gas analyses show that the gas in the eastern LSOZ reservoirs is bacterial, it likely formed in-place near the reservoirs and did not have to migrate far. Therefore, the gas could have been generated after faulting and accumulated within the fault blocks as localized pools. However, bacterial gas is present in both the eastern AND western parts of Elk Hills in the Dry Gas Zone (DGZ) near the top of the stratigraphic section even though the measured fault displacement is greatest in this zone. Bacterial gas is not present in the west in the deeper LSOZ which has less measured fault displacement. The main difference between the DGZ and the LSOZ appears to be the presence of a sandpoor area in the LSOZ in eastern Elk Hills. The lack of permeable migration pathways in this area would not allow eastern bacterial gas to migrate farther updip into western Elk Hills. A similar sand-poor area does not appear to exist in the DGZ but future research may be necessary to verify this.

Janice Gillespie

2004-11-01T23:59:59.000Z

277

Large-area, triple-junction a-Si alloy production scale-up. Semiannual subcontract report, 17 March 1994--18 September 1994  

DOE Green Energy (OSTI)

This report describes work performed under a 3-year subcontract to advance Solarex`s photovoltaic (PV) manufacturing technologies, reduce its hydrogenated amorphous silicon (a-Si:H) module production costs, increase module performance, and expand the Solarex commercial production capacity. During the period covered by this report, Solarex focused on (1) improving deposition of the front contact, (2) investigating alternate feed stocks for the front contact, (3) maximizing throughput and area utilization for all laser scribes, (4) optimizing a-Si:H deposition equipment to achieve uniform deposition over large areas, (5) optimizing the triple-junction module fabrication process, (6) evaluating the materials to deposit the rear contact, and (7) optimizing the combination of isolation scribe and encapsulant to pass the wet high-potential test.

Oswald, R.; Morris, J. [Solarex Corp., Newtown, PA (United States). Thin Film Div.

1995-03-01T23:59:59.000Z

278

ROCKY MOUNTAIN OILFIELD TESTING CENTER PROJECT TEST RESULTS  

NLE Websites -- All DOE Office Websites (Extended Search)

is also possible. Well 83A4 at the Naval Petroleum Reserve No. 3 was selected as a test well. This well is rod pumped and had a stable production history. It produced enough...

279

Radcalc for windows benchmark study: A comparison of software results with Rocky Flats hydrogen gas generation data  

DOE Green Energy (OSTI)

Radcalc for Windows Version 2.01 is a user-friendly software program developed by Waste Management Federal Services, Inc., Northwest Operations for the U.S. Department of Energy (McFadden et al. 1998). It is used for transportation and packaging applications in the shipment of radioactive waste materials. Among its applications are the classification of waste per the US. Department of Transportation regulations, the calculation of decay heat and daughter products, and the calculation of the radiolytic production of hydrogen gas. The Radcalc program has been extensively tested and validated (Green et al. 1995, McFadden et al. 1998) by comparison of each Radcalc algorithm to hand calculations. An opportunity to benchmark Radcalc hydrogen gas generation calculations to experimental data arose when the Rocky Flats Environmental Technology Site (RFETS) Residue Stabilization Program collected hydrogen gas generation data to determine compliance with requirements for shipment of waste in the TRUPACT-II (Schierloh 1998). The residue/waste drums tested at RFETS contain contaminated, solid, inorganic materials in polyethylene bags. The contamination is predominantly due to plutonium and americium isotopes. The information provided by Schierloh (1 998) of RFETS includes decay heat, hydrogen gas generation rates, calculated G{sub eff} values, and waste material type, making the experimental data ideal for benchmarking Radcalc. The following sections discuss the RFETS data and the Radcalc cases modeled with the data. Results are tabulated and also provided graphically.

MCFADDEN, J.G.

1999-07-19T23:59:59.000Z

280

A NOVEL LOW THERMAL BUDGET THIN-FILM POLYSILICON FABRICATION PROCESS FOR LARGE-AREA, HIGH-THROUGHPUT SOLAR CELL PRODUCTION  

DOE Green Energy (OSTI)

methods. The poly-Si solar cell structure and the performance have been examined. In principle, the new process is potentially applicable to produce large-area thin-film poly-Si solar cells at a high throughput and low cost. A critical issue in this process is to prevent the excessive dopant diffusion during crystallization. Process parameters and the cell structure have to be optimized to achieve the production goal.

Yue Kuo

2010-08-15T23:59:59.000Z

Note: This page contains sample records for the topic "rockies area product" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Evaluation of using cyclocranes to support drilling and production of oil and gas in Wetland Areas. Fourth quarterly report, [October--December 1992  

Science Conference Proceedings (OSTI)

The planned program falls under wetlands area research related to drilling, production, and transportation of oil and gas resources. Specifically the planned program addresses an evaluation of using cyclocraft to transport drill rigs, mud, pipes and other materials and equipment in a cost effective and environmentally safe manner to support oil and gas drilling and production operations in wetland areas. During the.reporting period, a report that contained the results of each of the five subtasks that comprise Task 1, Environmental Considerations, was prepared and submitted to DOE. The subtasks were an overview of oil and gas activities in wetlands; a review of present wetland access practices; identification of past environmental impacts experienced; definition of marsh habitat considerations and discussion of forested wetland considerations. In Task 2, Transport Requirements, a report on the acquisition of data on the transport requirements to support oil and gas drilling and production operations in Wetland Areas was prepared and submitted to DOE. Task 3, Parametric Analysis, was completed during the reporting period. The analysis showed that a cyclocraft, having a payload capacity of 45 tons, was the most economic and would be able to transport all of the required equipment and materials. The final report on the parametric analysis was to be submitted in January, 1993.

Eggington, W.J.

1992-12-31T23:59:59.000Z

282

The marriage of RCRA and CERCLA at the Rocky Flats Environmental Technology Site  

Science Conference Proceedings (OSTI)

A key goal of the Rocky Flats Cleanup Agreement (RFCA) signed in July of 1996 was to provide a seamless marriage of the Resource Conservation and Recovery Act (RCRA) (and other media specific programs) and the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) and the implementing agencies of each. This paper examines the two years since the signing of RFCA and identifies the successes, failures, and stresses of the marriage. RFCA has provided an excellent vehicle for regulatory and substantive progress at the Department of Energy`s Rocky Flats facility. The key for a fully successful marriage is to build on the accomplishments to date and to continually improve the internal and external systems and relationships. To date, the parties can be proud of both the substantial accomplishment of substantive environmental work and the regulatory systems that have enabled the work.

Shelton, D.C.; Brooks, L.M.

1998-11-01T23:59:59.000Z

283

Wind energy resource atlas. Volume 8. The southern Rocky Mountain region  

DOE Green Energy (OSTI)

The Southern Rocky Mountain atlas assimilates five collections of wind resource data: one for the region and one for each of the four states that compose the Southern Rocky Mountain region (Arizona, Colorado, New Mexico, and Utah). At the state level, features of the climate, topography and wind resource are discussed in greater detail than is provided in the regional discussion, and the data locations on which the assessment is based are mapped. Variations, over several time scales, in the wind resource at selected stations in each state are shown on graphs of monthly average and interannual wind speed and power, and hourly average wind speed for each season. Other graphs present speed, direction, and duration frequencies of the wind at these locations.

Andersen, S.R.; Freeman, D.L.; Hadley, D.L.; Elliott, D.L.; Barchet, W.R.; George, R.L.

1981-03-01T23:59:59.000Z

284

ROCKY MOUNTAIN OILFIELD TESTING CENTER Texaco Dual Action Pumping System  

NLE Websites -- All DOE Office Websites (Extended Search)

Texaco Dual Action Pumping System Texaco Dual Action Pumping System PROJECT TEST RESULTS March 16, 1998 Michael R. Tyler Project Manager Abstract The Texaco Dual Action Pumping System (DAPS) is designed to separate water from the oil in the casing-tubing annulas and inject most of the water into a lower formation while lifting the oil and remaining water to the surface. As oil production declines in a well the water production can increase. The lifting cost can be reduced per barrel of oil if less water is brought to the surface and processed. The DAPS was installed in a well that had been producing four (4) barrels of oil per day (bopd) and 46 barrels of water per day (bwpd), from the zone that became the injection zone. The well was recompleted in a shallower zone that was expected to yield an excessive quantity of

285

Evaluation of using cyclocranes to support drilling and production of oil and gas in wetland areas. Fourth quarterly technical progress report, Second quarter, 1993  

SciTech Connect

The planned program falls under wetlands area research related to drilling, production, and transportation of oil and gas resources. Specifically the planned program addresses an evaluation of using cyclocraft to transport drill rigs, mud, pipes and other materials and equipment in a cost effective and environmentally safe manner to support oil and gas drilling and production operations in wetland areas. The cyclocraft is a proven hybrid aircraft that utilizes aerostatic and aerodynamic lift. This type of aircraft has considerable payload capacity, VTOL capability, high controllability, low operating cost, low downwash and high safety. The benefits of using a cyclocraft to transport drill rigs and materials over environmentally-sensitive surfaces would be significant. The cyclocraft has considerable cost and operational advantages over the helicopter. The major activity during the second quarter of 1993 was focussed on completion of Task 4, Preliminary Design. The selected design has been designated H.1 Cyclocraft by MRC. Also during the report period, Task 6, Ground Support, was completed and a report containing the results was submitted to DOE. This task addressed the complete H.1 Cyclocraft system, i.e. it included the need personnel, facilities and equipment to support cyclocraft operations in wetland areas.

Eggington, W.J.

1993-09-01T23:59:59.000Z

286

Rocky Mountain (PADD4) Stocks of Crude Oil and Petroleum Products  

U.S. Energy Information Administration (EIA)

-No Data Reported; --= Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Notes: Stocks include those ...

287

Evaluation of using cyclocranes to support drilling and production of oil and gas in wetland areas. Third quarterly technical progress report, First quarter, 1993  

Science Conference Proceedings (OSTI)

The planned program falls under wetlands area research related to drilling, production, and transportation of oil and gas resources. Specifically the planned program addresses an evaluation of using cyclocraft to transport drill rigs, mud, pipes and other materials and equipment in a cost effective and environmentally safe manner to support oil and gas drilling and production operations in wetland areas. The cyclocraft is a proven hybrid aircraft that utilizes aerostatic and aerodynamic lift. This type of aircraft has considerable payload capacity, VTOL capability, high controllability, low operating cost, low downwash and high safety. The benefits of using a cyclocraft to transport drill rigs and materials over environmentally-sensitive surfaces would be significant. The cyclocraft has considerable cost and operational advantages over the helicopter. The major activity during the report period was focussed on Task 4, Preliminary Design. The selected design has been designated H.1 Cyclocraft by MRC. The preliminary design work was based on the results of the three preceding tasks. A report was initiated that contains descriptions of the H.1 Cyclocraft and its subsystems; options available for the final aircraft design process; performance, geometry, weights and power data; logistics and considerations relating to cyclocraft operations in wetlands.

Eggington, W.J.

1993-06-01T23:59:59.000Z

288

Evaluation of using cyclocranes to support drilling and production of oil and gas in wetland areas. Fifth quarterly technical progress report, Third quarter, 1993  

Science Conference Proceedings (OSTI)

The planned program falls under wetlands area research related to drilling, production, and transportation of oil and gas resources. Specifically the planned program addresses an evaluation of using cyclocraft to transport drill rigs, mud, pipes and other materials and equipment in a cost effective and environmentally safe manner to support oil and gas drilling and production operations in wetland areas. The cyclocraft is a proven hybrid aircraft that utilizes aerostatic and aerodynamic lift. This type of aircraft has considerable payload capacity, VTOL capability, high controllability, low operating cost, low downwash and high safety. The benefits of using a cyclocraft to transport drill rigs and materials over environmentally-sensitive surfaces would be significant. The cyclocraft has considerable cost and operational advantages over the helicopter. In 1992, Task 1, Environmental Considerations, and Task 2, Transport Requirements, were completed. In the first two quarters of 1993, Task 3, Parametric Analysis, Task 4, Preliminary Design, and Task 6, Ground Support, were completed. Individual reports containing results obtained from each of these tasks were submitted to DOE. In addition, through June 30, 1993, a Subscale Test Plan was prepared under Task 5, Subscale Tests, and work was initiated on Task 7, Environmental Impacts, Task 8, Development Plan, Task 9, Operating Costs, and Task 10, Technology Transfer.

Eggington, W.J.

1993-12-31T23:59:59.000Z

289

Large-area triple-junction a-Si alloy production scaleup. Annual subcontract report, 17 March 1993--18 March 1994  

DOE Green Energy (OSTI)

The objective of this subcontract over its three-year duration is to advance Solarex`s photovoltaic manufacturing technologies, reduce its a-Si:H module production costs, increase module performance and expand the Solarex commercial production capacity. Solarex shall meet these objectives by improving the deposition and quality of the transparent front contact, by optimizing the laser patterning process, scaling-up the semiconductor deposition process, improving the back contact deposition, scaling-up and improving the encapsulation and testing of its a-Si:H modules. In the Phase 2 portion of this subcontract, Solarex focused on improving deposition of the front contact, investigating alternate feed stocks for the front contact, maximizing throughput and area utilization for all laser scribes, optimizing a-Si:H deposition equipment to achieve uniform deposition over large-areas, optimizing the triple-junction module fabrication process, evaluating the materials to deposit the rear contact, and optimizing the combination of isolation scribe and encapsulant to pass the wet high potential test. Progress is reported on the following: Front contact development; Laser scribe process development; Amorphous silicon based semiconductor deposition; Rear contact deposition process; Frit/bus/wire/frame; Materials handling; and Environmental test, yield and performance analysis.

Oswald, R.; Morris, J. [Solarex Corp., Newtown, PA (United States). Thin Film Div.

1994-11-01T23:59:59.000Z

290

Production Hydraulic Packer Field Test  

Science Conference Proceedings (OSTI)

In October 1999, the Rocky Mountain Oilfield Testing Center and Halliburton Energy Services cooperated on a field test of Halliburton's new Production Hydraulic Packer technology on Well 46-TPX-10 at Naval Petroleum Reserve No. 3 near Casper, WY. Performance of the packer was evaluated in set and unset operations. The packer's ability to seal the annulus between the casing and tubing was hydraulically tested and the results were recorded.

Schneller, Tricia; Salas, Jose

2000-06-30T23:59:59.000Z

291

Rocky Mountain Oilfield Testing Center RMOTC at the Naval Petroleum Reserve No. 3  

NLE Websites -- All DOE Office Websites (Extended Search)

RMOTC RMOTC The Rocky Mountain Oilfield Testing Center (RMOTC), is an operating oil field focusing on environmentally-balanced energy technologies and alternatives, and is the premiere energy testing and demonstration field in the nation. 3 3 * the opportunity to explore environmentally- balanced solutions to the nation's energy issues * opportunities to develop, demonstrate, and evaluate a variety of energy related technologies * a chance to collaborate with top professionals in the energy, environmental technology, and engineering fields * shared industry knowledge through technology transfer via reports, journal articles, and presentations Located within the Naval Petroleum Reserve No. 3 (NPR-3) near Casper, Wyoming, RMOTC offers: RMOTC Offers Solutions 4 4 The Administration and Engineering

292

(A small-scale study of Rocky Flats uncalcined incinerator ash dissolution and filtrate anion exchange)  

SciTech Connect

Small scale experimentation was conducted with incinerator ash in the nitric/hydrofluoric acid cascade dissolver and the anion exchange systems at Rocky Flats and Los Alamos National Laboratories for the purpose of determining the following: to determine the relationship between calcium fluoride dissolution feed levels and plutonium dissolution yields. To determine the relationship between calcium fluoride feed levels to dissolution, and the performance of anion exchange when processing dissolution filtrate. To determine the effect of carbonaceous materials on the dissolution and anion exchange when recovering plutonium from incinerator ash.

Not Available

1990-01-01T23:59:59.000Z

293

HYDROGEN DATA FROM LOS ALAMOS [LANL] & SAVANNAH RIVER [SRC] & ROCKY FLATS [RFE] [SEC 1 & 2  

DOE Green Energy (OSTI)

A DOE letter dated August 14, 2001 requested that a detailed analysis of the expected probability of accumulation of significant quantities of hydrogen gas in unvented drums and a plan and schedule for venting drums be prepared and submitted. In response to the letter a document was prepared that included data of hydrogen concentrations in TRU waste drums. Data was collected from Savannah River Site, Los Alamos National Laboratory, and Rocky Flats Environmental Technology Site. These data were analyzed to provide the basis for evaluating the probability that significant quantities of hydrogen will accumulate in the unvented TRU drums stored at Hanford.

DAYLEY, L.

2001-11-19T23:59:59.000Z

294

Rebaselining of the plutonium residue elimination project at Rocky Flats Environmental Technology Site  

SciTech Connect

Systems Engineering and Value Engineering principles were put into practice in rebaselining the Pu Residue Stabilization and Elimination Project at the Rocky Flats Environmental Technology Site. Tradeoff studies were conducted as to how to best rebaseline the system under the new Safeguards Termination Limits (STSs) issued by the Department of Energy. Through the use of a computerized database, the means by which Stakeholder values and other high-level requirements have been included in the tradeoff studies were documented. 13 refs., 2 figs., 1 tab.

Sailor, W.C.; Catlett, D.S.; Burns, T.P. [and others

1997-03-01T23:59:59.000Z

295

History of Uranium-233(sup233U)Processing at the Rocky Flats Plant. In support of the RFETS Acceptable Knowledge Program  

Science Conference Proceedings (OSTI)

This report documents the processing of Uranium-233 at the Rocky Flats Plant (Rocky Flats Environmental Technology Site). The information may be used to meet Waste Isolation Pilot Plant (WIPP) Waste Acceptance Criteria (WAC)and for determining potential Uranium-233 content in applicable residue waste streams.

Moment, R.L.; Gibbs, F.E.; Freiboth, C.J.

1999-04-01T23:59:59.000Z

296

Rocky Flats Closure: the Role of Models in Facilitating Scientific Communication With Stakeholder Groups  

SciTech Connect

The Rocky Flats Environmental Technology Site (RFETS) was a U.S. Department of Energy (DOE) environmental cleanup site for a previous manufacturing plant that made components for the U.S. nuclear weapons arsenal. The facility was shut down in 1989 to address environmental and safety concerns, and left behind a legacy of contaminated facilities, soils, surface and ground water. In 1995, the Site contractor established the Actinide Migration Evaluation (AME) advisory group to provide advice and technical expertise on issues of actinide behavior and mobility in the air, surface water, groundwater, and soil. Through a combination of expert judgment supported by state-of-the-art scientific measurements, it was shown that under environmental conditions at Rocky Flats, plutonium and americium form insoluble oxides that adhere to small soil, organic, and mineral particles and colloids, or are colloidal materials themselves. A series of models ranging from conceptual, geostatistical, and large-scale wind and surface water erosion models were used to guide stakeholder interactions. The nature of these models, and their use in public communication is described.

Clark, D.L.; Choppin, G.R.; Dayton, C.S.; Janecky, D.R.; Lane, L.J.; Paton, I.

2009-05-28T23:59:59.000Z

297

Waste drum gas generation sampling program at Rocky Flats during FY 1988  

DOE Green Energy (OSTI)

Rocky Flats Plant Transuranic Waste Drums were sampled for gas composition. Combustibles, plastics, Raschig rings, solidified organic sludge, and solidified inorganic sludge transuranic waste forms were sampled. Plastic bag material and waste samples were also taken from some solidified sludge waste drums. A vacuum system was used to sample each layer of containment inside a waste drum, including individual waste bags. G values (gas generation) were calculated for the waste drums. Analytical results indicate that very low concentrations of potentially flammable or corrosive gas mixtures will be found in vented drums. G(H{sub 2}) was usually below 1.6, while G(Total) was below 4.0. Hydrogen permeability tests on different types of plastic waste bags used at Rocky Flats were also conducted. Polyvinylchloride was slightly more permeable to hydrogen than polyethylene for new or creased material. Permeability of aged material to hydrogen was slightly higher than for new material. Solidified organic and inorganic sludges were sampled for volatile organics. The analytical results from two drums of solidified organic sludges showed concentrations were above detection limits for four of the 36 volatile organics analyzed. The analytical results for four of the five solidified inorganic sludges show that concentrations were below detection limits for all volatile organics analyzed. 3 refs., 5 figs., 2 tabs.

Roggenthen, D.K.; McFeeters, T.L.; Nieweg, R.G.

1991-02-11T23:59:59.000Z

298

Fiscal year 1990 Rocky Flats Plant Environmental Restoration program Current-Year Work Plan  

SciTech Connect

The Rocky Flats Plant (RFP) is a nuclear weapons manufacturing facility currently operated by EG G for the US Department of Energy (DOE). RFP is located at the foot of the Rocky Mountains in Jefferson Country, Colorado. The Fiscal Year 1990 (FY90) Current-Year Work Plan (CYWP) is intended to serve as a guidance document for the Environmental Restoration (ER) and RCRA Compliance programs that will be implemented at RFP. The CYWP provides in one document any cross-references necessary to understand the interrelationships between the CYWP and the DOE Five-Year Plan (FYP), Site-Specific Plan (SSP), and other related documents. The scope of this plan includes comparison of planned FY90 ER activities to those actually achieved. The CYWP has been updated to include Colorado Department of Health (CDH), US Environmental Protection Agency (EPA), and DOE Inter-Agency Agreement ER activities. It addresses hazardous wastes, radioactive wastes, mixed wastes (radioactive and hazardous), and sanitary wastes. The CYWP also addresses facilities and sites contaminated with or used in management of those wastes.

Nielsen, T. (EG and G Rocky Flats, Inc., Golden, CO (USA)); Waage, E.; Miller, D. (Stoller (S.M.) Corp., Boulder, CO (USA))

1990-01-01T23:59:59.000Z

299

Aspen Ecology in Rocky Mountain National Park: Age Distribution, Genetics, and the Effects of Elk Herbivory  

SciTech Connect

Lack of aspen (Populus tremuloides) recruitment and canopy replacement of aspen stands that grow on the edges of grasslands on the low-elevation elk (Cervus elaphus) winter range of Rocky Mountain National Park (RMNP) in Colorado has been a cause of concern for more than 70 years (Packard, 1942; Olmsted, 1979; Stevens, 1980; Hess, 1993; R.J. Monello, T.L. Johnson, and R.G. Wright, Rocky Mountain National Park, 2006, written commun.). These aspen stands are a significant resource since they are located close to the park's road system and thus are highly visible to park visitors. Aspen communities are integral to the ecological structure of montane and subalpine landscapes because they contain high native species richness of plants, birds, and butterflies (Chong and others, 2001; Simonson and others, 2001; Chong and Stohlgren, 2007). These low-elevation, winter range stands also represent a unique component of the park's plant community diversity since most (more than 95 percent) of the park's aspen stands grow in coniferous forest, often on sheltered slopes and at higher elevations, while these winter range stands are situated on the low-elevation ecotone between the winter range grasslands and some of the park's drier coniferous forests.

Tuskan, Gerald A [ORNL; Yin, Tongming [ORNL

2008-10-01T23:59:59.000Z

300

Smooth Brome-The Silent Invader of Native Areas | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Smooth Brome-The Silent Invader of Native Areas Smooth Brome-The Silent Invader of Native Areas Smooth Brome-The Silent Invader of Native Areas December 31, 2007 - 8:57am Addthis Jody K. Nelson*, USDOE - Rocky Flats Site, Westminster, CO Smooth Brome (Bromus inermis) - The Silent Invader of Native Areas Smooth brome (Bromus inermis) is an exotic graminoid species that has been used for over a century across much of North America for range improvement and revegetation. While most "noxious" weeds invade quickly and are quite noticeable, a smooth brome invasion can imperceptibly transform the native grassland diversity to a near monoculture over many years or decades. At the Rocky Flats Site, a U.S. Department of Energy facility near Denver, Colorado, smooth brome is increasingly problematic, as it is along

Note: This page contains sample records for the topic "rockies area product" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Bay Area | Open Energy Information  

Open Energy Info (EERE)

Bay Area Bay Area Jump to: navigation, search Contents 1 Clean Energy Clusters in the Bay Area 1.1 Products and Services in the Bay Area 1.2 Research and Development Institutions in the Bay Area 1.3 Networking Organizations in the Bay Area 1.4 Investors and Financial Organizations in the Bay Area 1.5 Policy Organizations in the Bay Area Clean Energy Clusters in the Bay Area Products and Services in the Bay Area Loading map... {"format":"googlemaps3","type":"ROADMAP","types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"limit":500,"offset":0,"link":"all","sort":[""],"order":[],"headers":"show","mainlabel":"","intro":"","outro":"","searchlabel":"\u2026

302

Texas Area | Open Energy Information  

Open Energy Info (EERE)

Area Area Jump to: navigation, search Contents 1 Clean Energy Clusters in the Texas Area 1.1 Products and Services in the Texas Area 1.2 Research and Development Institutions in the Texas Area 1.3 Networking Organizations in the Texas Area 1.4 Investors and Financial Organizations in the Texas Area 1.5 Policy Organizations in the Texas Area Clean Energy Clusters in the Texas Area Products and Services in the Texas Area Loading map... {"format":"googlemaps3","type":"ROADMAP","types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"limit":500,"offset":0,"link":"all","sort":[""],"order":[],"headers":"show","mainlabel":"","intro":"","outro":"","searchlabel":"\u2026

303

THE ROLE OF LAND USE IN ENVIRONMENTAL DECISION MAKING AT THREE DOE MEGA-CLEANUP SITES FERNALD & ROCKY FLATS & MOUND  

SciTech Connect

This paper explores the role that future land use decisions have played in the establishment of cost-effective cleanup objectives and the setting of environmental media cleanup levels for the three major U.S. Department of Energy (DOE) sites for which cleanup has now been successfully completed: the Rocky Flats, Mound, and Fernald Closure Sites. At each site, there are distinct consensus-building histories throughout the following four phases: (1) the facility shut-down and site investigation phase, which took place at the completion of their Cold War nuclear-material production missions; (2) the decision-making phase, whereby stakeholder and regulatory-agency consensus was achieved for the future land-use-based environmental decisions confronting the sites; (3) the remedy selection phase, whereby appropriate remedial actions were identified to achieve the future land-use-based decisions; and (4) the implementation phase, whereby the selected remedial actions for these high-profile sites were implemented and successfully closed out. At each of the three projects, there were strained relationships and distrust between the local community and the DOE as a result of site contamination and potential health effects to the workers and local residents. To engage citizens and interested stakeholder groups - particularly in the role of final land use in the decision-making process, the site management teams at each respective site developed new public-participation strategies to open stakeholder communication channels with site leadership, technical staff, and the regulatory agencies. This action proved invaluable to the success of the projects and reaching consensus on appropriate levels of cleanup. With the implementation of the cleanup remedies now complete, each of the three DOE sites have become models for future environmental-remediation projects and associated decision making.

JEWETT MA

2011-01-14T23:59:59.000Z

304

FY 1992 Annual report: Mediated electrochemical oxidation treatment for Rocky Flats combustible low-level mixed waste. Final report to Rocky Flats Plant  

SciTech Connect

The Mediated Electrochemical Oxidation (MEO) process was studied for destroying low-level combustible mixed wastes at Rocky Flats (RFP). Tests were performed with nonradioactive surrogate materials: Trimsol for the contaminated oils, and reagent-grade cellulose for the cellulosic wastes. Extensive testing was carried out on Trimsol in both small laboratory-scale apparatus and on a large-scale system incorporating an industrial-size electrochemical cell. Preliminary tests were also carried out in the small-scale system with cellulose. The following operating and system parameters were studied: use of a silver-nitric acid versus a cobalt-sulfuric acid system, effect of electrolyte temperature, effect of acid concentration, effect of current density, and use of ultrasonic agitation. Destruction and coulombic efficiencies were calculated using data obtained from continuous carbon dioxide monitors and total organic carbon (TOC) analysis of electrolyte samples. For Trimsol, the best performance was achieved with the silver-nitrate system at high acid concentrations, temperatures, and current densities. Destruction efficiencies of 98% or greater and coulombic efficiencies close to 50% were obtained in both small- and large-scale systems. For the cellulose, high destruction efficiencies and reasonable coulombic efficiencies were obtained for both silver-nitrate and cobalt-sulfate systems.

Chiba, Z.; Lewis, P.R.; Kahle, R.W.

1993-03-01T23:59:59.000Z

305

Case History of a Clean Water Act Compliance Agreement at the Rocky Flats Environmental Technology Site near Golden, Colorado  

Science Conference Proceedings (OSTI)

A major Clean Water Act (CWA) Federal Facilities Compliance Agreement was signed on March 25, 1991 by the US Department of Energy, Rocky Flats Field Office (DOE, RFFO) and the Water Enforcement Division of the Environmental Protection Agency (EPA), Region VIII. The agreement revised the Rocky Flats Plant`s National Pollutant Discharge Elimination System (NPDES) permit and arose from pemittee-requested changes in effluent monitoring points and permit violations, most notably the February 22, 1989 Chromic Acid Incident. The Rocky Flats Plant, now called the Rocky Flats Environmental Technology Site (Site) near Golden Colorado was operated at that time by Rockwell International Corporation, who later plead guilty to six misdemeanor and felony counts of the CWA (the aforementioned NPDES permit violations) and paid a $4 million fine on March 26, 1992. The Compliance Agreement, hereafter referred to as the NPDES FFCA, called for three separate remedial action plans and contained a schedule for their submittal to the EPA. The compliance plans focussed on: (1) Waste Water Treatment Plant (WWTP) performance upgrades, (2) source control and surface water protection, and (3) characterization of the impacts from past sludge disposal practices. Projects that implemented the compliance plans were initiated soon after submittal to the EPA and are forecast to complete in 1997 at a total cost of over $35 million. This paper presents a case history of NPDES FFCA compliance projects and highlights the successes, failures, and lessons learned.

Thompson, J.S.

1995-08-01T23:59:59.000Z

306

A Five-Year Climatology of Elevated Severe Convective Storms in the United States East of the Rocky Mountains  

Science Conference Proceedings (OSTI)

A 5-yr climatology of elevated severe convective storms was constructed for 198387 east of the Rocky Mountains. Potential cases were selected by finding severe storm reports on the cold side of surface fronts. Of the 1826 days during the 5-yr ...

Katherine L. Horgan; David M. Schultz; John E. Hales Jr.; Stephen F. Corfidi; Robert H. Johns

2007-10-01T23:59:59.000Z

307

Community Surveys: Low Dose Radiation. Fernald, Ohio and Rocky Flats, Colorado  

SciTech Connect

This report is intended to present a basic description of the data from the two community surveys and to document the text of the questions; the methods used for the survey data collection; and a brief overview of the results. Completed surveys were conducted at local communities near the Rocky Flats, Colorado and the Fernald, Ohio sites; no survey was conducted for the Brookhaven, New York site. Fernald. The Fernald sample was randomly selected from 98% of all potential residential telephones in the townships of Ross, Morgan, and Crosby. The only telephone exchanges not used for the Fernald study had 4%, or fewer, of the holders of the telephone numbers actually living in either of the three target townships. Surveying started on July 24, 2001 and finished on August 30, 2001. A total of 399 completed interviews were obtained resulting in a CASRO response rate of 41.8%. The average length of an interview was 16.5 minutes. Rocky Flats. The sample was randomly selected from all potential residential telephones in Arvada and from 99% of the potential telephones in Westminster. Surveying started on August 10, 2001 and finished on September 25, 2001. A total of 401 completed interviews were obtained with a CASRO response rate of 32.5%. The average length of an interview was 15.7 minutes. Overall, respondents hold favorable views of science. They indicate an interest in developments in science and technology, feel that the world is better off because of science, and that science makes our lives healthier, easier, and more comfortable. However, respondents are divided on whether science should decide what is safe or not safe for themselves and their families. The majority of the respondents think that standards for exposure to radiation should be based on what science knows about health effects of radiation and on what is possible with today's technology. Although few respondents had visited the sites, most had heard or read something about Fernald or Rocky Flat s in the media. Impressions of the sites tend to be negative. Most respondents feel that overall their community would be better off without the site. However, when asked about the economic future of their community after cleanup and closure of the site, only 31-43% thought that it will be better, 47-56% thought their local economy will be about the same.

C. K. Mertz; James Flynn; Donald G. MacGregor; Theresa Satterfield; Stephen M. Johnson; Seth Tuler; Thomas Webler

2002-10-16T23:59:59.000Z

308

Production  

E-Print Network (OSTI)

There are serious concerns about the greenhouse gas (GHG) emissions, energy and nutrient and water use efficiency of large-scale, first generation bio-energy feedstocks currently in use. A major question is whether biofuels obtained from these feedstocks are effective in combating climate change and what impact they will have on soil and water resources. Another fundamental issue relates to the magnitude and nature of their impact on food prices and ultimately on the livelihoods of the poor. A possible solution to overcome the current potentially large negative effects of large-scale biofuel production is developing second and third generation conversion techniques from agricultural residues and wastes and step up the scientific research efforts to achieve sustainable biofuel production practices. Until such sustainable techniques are available governments should scale back their support for and promotion of biofuels. Multipurpose feedstocks should be investigated making use of the bio-refinery concept (bio-based economy). At the same time, the further development of non-commercial, small scale

Science Council Secretariat

2008-01-01T23:59:59.000Z

309

Natural gas production problems : solutions, methodologies, and modeling.  

Science Conference Proceedings (OSTI)

Natural gas is a clean fuel that will be the most important domestic energy resource for the first half the 21st centtuy. Ensuring a stable supply is essential for our national energy security. The research we have undertaken will maximize the extractable volume of gas while minimizing the environmental impact of surface disturbances associated with drilling and production. This report describes a methodology for comprehensive evaluation and modeling of the total gas system within a basin focusing on problematic horizontal fluid flow variability. This has been accomplished through extensive use of geophysical, core (rock sample) and outcrop data to interpret and predict directional flow and production trends. Side benefits include reduced environmental impact of drilling due to reduced number of required wells for resource extraction. These results have been accomplished through a cooperative and integrated systems approach involving industry, government, academia and a multi-organizational team within Sandia National Laboratories. Industry has provided essential in-kind support to this project in the forms of extensive core data, production data, maps, seismic data, production analyses, engineering studies, plus equipment and staff for obtaining geophysical data. This approach provides innovative ideas and technologies to bring new resources to market and to reduce the overall environmental impact of drilling. More importantly, the products of this research are not be location specific but can be extended to other areas of gas production throughout the Rocky Mountain area. Thus this project is designed to solve problems associated with natural gas production at developing sites, or at old sites under redevelopment.

Rautman, Christopher Arthur; Herrin, James M.; Cooper, Scott Patrick; Basinski, Paul M. (El Paso Production Company, Houston, TX); Olsson, William Arthur; Arnold, Bill Walter; Broadhead, Ronald F. (New Mexico Bureau of Geology and Mineral Resources, Socorro, NM); Knight, Connie D. (Consulting Geologist, Golden, CO); Keefe, Russell G.; McKinney, Curt (Devon Energy Corporation, Oklahoma City, OK); Holm, Gus (Vermejo Park Ranch, Raton, NM); Holland, John F.; Larson, Rich (Vermejo Park Ranch, Raton, NM); Engler, Thomas W. (New Mexico Institute of Mining and Technology, Socorro, NM); Lorenz, John Clay

2004-10-01T23:59:59.000Z

310

Rocky Flats Environmental Technology Site Mixed Residue Consent Order, September 24, 1999 Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9-09-24-01 9-09-24-01 State Colorado Agreement Type Consent Order Legal Driver(s) RCRA Scope Summary Substitute this Consent Order for the MR Consent Order; establish requirements for mixed residues management. Parties DOE ; Kaiser-Hill Company, LLC; Safe Sites of Colorado, LLC; Rocky Mountain Remediation Services, LLC; Colorado Department of Public Health and Environment Date 9/24/1999 SCOPE * Substitute this Consent Order for the MR Consent Order by modifying in its entirety the Settlement Agreement and Compliance Order on Consent, number 93-04-23-01, (the "MR Consent Order"). * Establish requirements for certain activities involving mixed residues management. * Establish enforceable commitment dates. ESTABLISHING MILESTONES * Provisions regarding enforceable commitment dates and the procedures to add

311

Microsoft Word - CX-Rocky Reach-Maple Valley No1_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2010 3, 2010 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Darin Bowman Project Manager - TELF-TPP-3 Proposed Action: Rocky Reach-Maple Valley No. 1 mile 47 bridge replacement project Budget Information: Work Order # 219783 PP&A Project No.: 955 Proposed by: Bonneville Power Administration (BPA) Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance activities for structures, rights-of-way, and infrastructures such as roads that are required to maintain infrastructures in a condition suitable for a facility to be used for its designed purpose. Location: BPA, in coordination with the Cle Elum Ranger District of the Okanogan-Wenatchee National Forest, is proposing to construct a bridge across Cold Creek. The proposed project is

312

Rocky Mountain Oilfield Testing Center RMOTC at the Naval Petroleum Reserve No. 3  

NLE Websites -- All DOE Office Websites (Extended Search)

Playing Hide and Seek with Playing Hide and Seek with the Hole-in-the-Wall Gang: Recent Technology Testing at Wyoming's Rocky Mountain Oilfield Testing Center (RMOTC) A presentation for The Salt Lake City SPE Chapter October 19, 2005 Tom Anderson Business Development Manager Data Management Project Manager RMOTC Outline * What is RMOTC? * The Hole-in-the-Wall Gang * "Virtual Field Trip" of Teapot Dome * Hiding: - CO 2 Sequestration - Pipeline Leak Detection * Seeking: - Microhole Drilling - High Pressure Jet-Assisted Drillbit - Flow Assurance Test Loop - Tubing Rotator * Sharing Data With Partners The Hole-in-the-Wall Gang Wyoming Doug Judith Spike Joe Brian Jim Mark Ralph Vicki Lyle Butch and Sundance \A1;Flow Assurance Loop 011 024 020 029 032 023 026 033 005 028 021 027 022 004 023 024 034 035 008 025 021 013 003 036 009 017 002 001

313

Rocky Mountain Oilfield Testing Center RMOTC at the Naval Petroleum Reserve No. 3  

NLE Websites -- All DOE Office Websites (Extended Search)

& Renewable Energy Scoping Meeting & Renewable Energy Scoping Meeting March 26, 2004 2 2 RMOTC The Rocky Mountain Oilfield Testing Center (RMOTC), is an operating oil field focusing on environmentally-balanced energy technologies and alternatives, and is the premiere energy testing and demonstration field in the nation. 3 3 * the opportunity to explore environmentally- balanced solutions to the nation's energy issues * opportunities to develop, demonstrate, and evaluate a variety of energy related technologies * a chance to collaborate with top professionals in the energy, environmental technology, and engineering fields * shared industry knowledge through technology transfer via reports, journal articles, and presentations Located within the Naval Petroleum Reserve No. 3 (NPR-3) near Casper, Wyoming, RMOTC offers:

314

Climate-related, long-term faunal changes in a California rocky intertidal community  

SciTech Connect

Changes in the invertebrate fauna of a California rocky intertidal community between the period 1931 to 1933 and the period 1993 to 1994 indicate that species` ranges shifted northward, consistent with predictions of change associated with climate warming. Of 45 invertebrate species, the abundances of eight of nine southern species increased and the abundances of five of eight northern species decreased. No trend was evident for cosmopolitan species. Annual mean shoreline ocean temperatures at the site increased by 0.75{degrees}C during the past 60 years, and mean summer maximum temperature from 1983 to 1993 were 2.2{degrees}C warmer than for the period 1921 to 1931. 33 refs., 2 figs.

Barry, J.P.; Baxter, C.H.; Sugarin, R.D.; Gilman, S.E. [Hopkins Marine Station of Stanford Univ., Pacific Grove, CA (United States)

1995-02-03T23:59:59.000Z

315

A NOVEL LOW THERMAL BUDGET THIN-FILM POLYSILICON FABRICATION PROCESS FOR LARGE-AREA, HIGH-THROUGHPUT SOLAR CELL PRODUCTION  

SciTech Connect

A novel thin-film poly-Si fabrication process has been demonstrated. This low thermal budget process transforms the single- and multi-layer amorphous silicon thin films into a poly-Si structure in one simple step over a pulsed rapid thermal annealing process with the enhancement of an ultrathin Ni layer. The complete poly-Si solar cell was fabricated in a short period of time without deteriorating the underneath glass substrate. The unique vertical crystallization process including the mechanism is discussed. Influences of the dopant type and process parameters on crystal structure will be revealed. The poly-Si film structure has been proved using TEM, XRD, Raman, and XPS methods. The poly-Si solar cell structure and the performance have been examined. In principle, the new process is potentially applicable to produce large-area thin-film poly-Si solar cells at a high throughput and low cost. A critical issue in this process is to prevent the excessive dopant diffusion during crystallization. Process parameters and the cell structure have to be optimized to achieve the production goal.

Yue Kuo

2010-08-15T23:59:59.000Z

316

Cementation and solidification of miscellaneous mixed wastes at the Rocky Flats Environmental Technology Site  

Science Conference Proceedings (OSTI)

The Rocky Flats Environmental Technology Site produces a variety of wastes which are amenable to micro-encapsulation in cement Portland cement is an inexpensive and readily available material for this application. The Waste Projects (WP) group at Rocky Flats evaluated cementation to determine its effectiveness in encapsulating several wastes. These included waste analytical laboratory solutions, incinerator ash, hydroxide precipitation sludge, and an acidic solution from the Delphi process (a chemical oxidation technology being evaluated as an alternative to incineration). WP prepared surrogate wastes and conducted designed experiments to optimize the cement formulation for the waste streams. These experiments used a Taguchi or factorial experimental design, interactions between the variables were also considered in the testing. Surrogate waste samples were spiked with various levels of each of six Resource Conservation and Recovery Act (RCRA) listed metals (Cd, Cr, Ba, Pb, Ni, and Ag), cemented using the optimized formulation, and analyzed for leach resistance using the Toxicity Characteristic Leaching Procedure (TCLP). The metal spike levels chosen were based on characterization data, and also based on an estimate of the highest levels of contaminants suspected in the waste. This paper includes laboratory test results for each waste studied. These include qualitative observations as well as quantitative data from TCLP analyses and environmental cycling studies. The results from these experiments show that cement stabilization of the different wastes can produce final waste forms which meet the current RCRA Land Disposal Restriction (LDR) requirements. Formulations that resulted in LDR compliant waste forms are provided. The volume increases associated with cementation are also lower than anticipated. Future work will include verification studies with actual mixed radioactive waste as well as additional formulation development studies on other waste streams.

Phillips, J.A.; Semones, G.B.

1995-02-01T23:59:59.000Z

317

Vitrification of simulated radioactive Rocky Flats plutonium containing ash residue with a Stir Melter System  

Science Conference Proceedings (OSTI)

A demonstration trial has been completed in which a simulated Rocky Flats ash consisting of an industrial fly-ash material doped with cerium oxide was vitrified in an alloy tank Stir-Melter{trademark} System. The cerium oxide served as a substitute for plutonium oxide present in the actual Rocky Flats residue stream. The glass developed falls within the SiO{sub 2} + Al{sub 2}O{sub 3}/{Sigma}Alkali/B{sub 2}O{sub 3} system. The glass batch contained approximately 40 wt% of ash, the ash was modified to contain {approximately} 5 wt% CeO{sub 2} to simulate plutonium chemistry in the glass. The ash simulant was mixed with water and fed to the Stir-Melter as a slurry with a 60 wt% water to 40 wt% solids ratio. Glass melting temperature was maintained at approximately 1,050 C during the melting trials. Melting rates as functions of impeller speed and slurry feed rate were determined. An optimal melting rate was established through a series of evolutionary variations of the control variables` settings. The optimal melting rate condition was used for a continuous six hour steady state run of the vitrification system. Glass mass flow rates of the melter were measured and correlated with the slurry feed mass flow. Melter off-gas was sampled for particulate and volatile species over a period of four hours during the steady state run. Glass composition and durability studies were run on samples collected during the steady state run.

Marra, J.C. [Westinghouse Savannah River Co., Aiken, SC (United States); Kormanyos, K.R.; Overcamp, T.J.

1996-10-01T23:59:59.000Z

318

300 AREA URANIUM CONTAMINATION  

SciTech Connect

{sm_bullet} Uranium fuel production {sm_bullet} Test reactor and separations experiments {sm_bullet} Animal and radiobiology experiments conducted at the. 331 Laboratory Complex {sm_bullet} .Deactivation, decontamination, decommissioning,. and demolition of 300 Area facilities

BORGHESE JV

2009-07-02T23:59:59.000Z

319

A Synoptic Weather Pattern and Sounding-Based Climatology of Freezing Precipitation in the United States East of the Rocky Mountains  

Science Conference Proceedings (OSTI)

An analysis of 411 winter storms that produced freezing precipitation events in the United States east of the Rocky Mountains over the 25-yr period of 197094 is presented to identify specific weather patterns associated with freezing ...

Robert M. Rauber; Larry S. Olthoff; Mohan K. Ramamurthy; Dianne Miller; Kenneth E. Kunkel

2001-10-01T23:59:59.000Z

320

Synoptic-Scale Environments of Predecessor Rain Events Occurring East of the Rocky Mountains in Association with Atlantic Basin Tropical Cyclones  

Science Conference Proceedings (OSTI)

The synoptic-scale environments of predecessor rain events (PREs) occurring to the east of the Rocky Mountains in association with Atlantic basin tropical cyclones (TCs) are examined. PREs that occurred during 19882010 are subjectively classified ...

Benjamin J. Moore; Lance F. Bosart; Daniel Keyser; Michael L. Jurewicz

2013-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "rockies area product" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

A Rocky Mountain Storm. Part II: The Forest Blowdown over the West Slope of the Northern Colorado MountainsObservations, Analysis, and Modeling  

Science Conference Proceedings (OSTI)

A devastating winter storm affected the Rocky Mountain states over the 3-day period of 2426 October 1997. Blizzard conditions persisted over the foothills and adjoining plains from Wyoming to southern New Mexico, with maximum total snowfall ...

Michael P. Meyers; John S. Snook; Douglas A. Wesley; Gregory S. Poulos

2003-08-01T23:59:59.000Z

322

Production Worker Screening Projects | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Production Production Worker Screening Projects Production Worker Screening Projects Sites listed below are the primary DOE sites served. Production workers from DOE sites not listed below are covered by the National Supplemental Screening Program (NSSP). Additional information regarding NSSP can be found on their website or by calling 1-866-812-6703. California: Lawrence Berkeley National Laboratory Lawrence Livermore National Laboratory Sandia National Laboratories (Livermore, CA) Colorado: Rocky Flats Florida: Pinellas Idaho: Argonne National Laboratory-West Idaho National Laboratory Illinois: Argonne National Laboratory Fermi National Accelerator Laboratory Iowa: Ames Laboratory Iowa Army Ammunition Plant Kentucky: Paducah Gaseous Diffusion Plant Missouri: Kansas City Plant Nevada:

323

State geothermal commercialization programs in ten Rocky Mountain states. Semi-annual progress report, July-December 1979  

SciTech Connect

The activities and findings of the ten state teams participating in the Rocky Mountain Basin and Range Regional Hydrothermal Commercialization Program for the period are described. A summary of the state projects, compilation of project accomplishments, summary of findings, and a description of the major conclusions and recommendations are presented. Also included are chapters on the commercialization activities carried out by individual teams in each state: Arizona, Colorado, Idaho, Montana, Nevada, New-Mexico, North Dakota, South Dakota, Utah, and Wyoming. (MHR)

Griffith, J.L. (comp.)

1980-08-01T23:59:59.000Z

324

An assessment and evaluation for recycle/reuse of contaminated process and metallurgical equipment at the DOE Rocky Flats Plant Site -- Building 865. Final report  

SciTech Connect

An economic analysis of the potential advantages of alternatives for recycling and reusing equipment now stored in Building 865 at the Rocky Flats Plant (RFP) in Colorado has been conducted. The inventory considered in this analysis consists primarily of metallurgical and process equipment used before January 1992, during development and production of nuclear weapons components at the site. The economic analysis consists of a thorough building inventory and cost comparisons for four equipment dispositions alternatives. The first is a baseline option of disposal at a Low Level Waste (LLW) landfill. The three alternatives investigated are metal recycling, reuse with the government sector, and release for unrestricted use. This report provides item-by-item estimates of value, disposal cost, and decontamination cost. The economic evaluation methods documented here, the simple cost comparisons presented, and the data provided as a supplement, should provide a foundation for D&D decisions for Building 865, as well as for similar D&D tasks at RFP and at other sites.

Not Available

1993-08-01T23:59:59.000Z

325

SCO shipments from Rocky Flats - Experience and current practice [Surface Contaminated Object  

SciTech Connect

Decommissioning activities at Rocky Flats Environmental Technology Site (RFETS) are expected to generate approximately 251,000 cubic meters of low-level radioactive waste. Almost half of this will be characterized and shipped as the Department of Transportation ''Surface Contaminated Object'' (SCO) shipping class. In the 2 years since an SCO characterization method was implemented, almost 11,000 of the 18,000 cubic meters of low-level waste were SCO. RFETS experience to-date using an SCO waste characterization method has shown significant time and cost savings, reduced errors, and enhanced employee safety. SCO waste is characterized prior to packaging, near the point of generation, by any of the site's 300 Radiological Control Technicians using inexpensive radiological control survey instruments. This reduces on-site waste container moves and eliminates radiometric analysis at centrally located drum or crate counters. Containers too large for crate counters can also be characterized. Current instrumentation is not adequate to take full advantage of the SCO regulations. Future improvements in the SCO characterization and shipping process are focused on use of larger and/or reusable containers, extended-range instruments, and additional statistical methods, so that the full extent of the SCO regulations can be used.

Bracken, Gary; Morris, Robert L.

2001-01-10T23:59:59.000Z

326

Evaluation of remedial alternatives for the Solar Ponds Plume, Rocky Flats Environmental Technology Site  

SciTech Connect

This paper describes the process used to select a remedial alternative for handling contaminated groundwater emanating from the Solar Evaporation Ponds (Solar Ponds) at the Rocky Flats Environmental Technology Site (RFETS) and prevent it from reaching the nearest surface water body, North Walnut Creek. Preliminary results of field investigations conducted to provide additional information for the alternatives analysis are also presented. The contaminated groundwater is referred to as the Solar Ponds Plume (SPP). The primary contaminants in the SPP are nitrate and uranium; however, some metals exceed the site action levels at several locations and volatile organic compounds, originating from other sources, also have been detected. Currently the SPP, local surface water runoff, and infiltrated precipitation are collected by a trench system located downgradient of the Solar Ponds and pumped to three storage tanks. The water (two to three million gallons annually) is then pumped to an on-site treatment plant for evaporation at an approximate cost of $7.57 per liter.

Hranac, K.C. [Morrison Knudsen Corp., Golden, CO (United States). Rocky Flats Environmental Technology Site; Chromec, F.W.; Fiehweg, R. [Rocky Mountain Remediation Services, Golden, CO (United States). Rocky Flats Environmental Technology Site; Hopkins, J. [Rocky Mountain Remediation Services, Los Alamos, NM (United States)

1998-07-01T23:59:59.000Z

327

Acceptable knowledge document for INEEL stored transuranic waste -- Rocky Flats Plant waste. Revision 2  

Science Conference Proceedings (OSTI)

This document and supporting documentation provide a consistent, defensible, and auditable record of acceptable knowledge for waste generated at the Rocky Flats Plant which is currently in the accessible storage inventory at the Idaho National Engineering and Environmental Laboratory. The inventory consists of transuranic (TRU) waste generated from 1972 through 1989. Regulations authorize waste generators and treatment, storage, and disposal facilities to use acceptable knowledge in appropriate circumstances to make hazardous waste determinations. Acceptable knowledge includes information relating to plant history, process operations, and waste management, in addition to waste-specific data generated prior to the effective date of the RCRA regulations. This document is organized to provide the reader a comprehensive presentation of the TRU waste inventory ranging from descriptions of the historical plant operations that generated and managed the waste to specific information about the composition of each waste group. Section 2 lists the requirements that dictate and direct TRU waste characterization and authorize the use of the acceptable knowledge approach. In addition to defining the TRU waste inventory, Section 3 summarizes the historical operations, waste management, characterization, and certification activities associated with the inventory. Sections 5.0 through 26.0 describe the waste groups in the inventory including waste generation, waste packaging, and waste characterization. This document includes an expanded discussion for each waste group of potential radionuclide contaminants, in addition to other physical properties and interferences that could potentially impact radioassay systems.

NONE

1998-01-23T23:59:59.000Z

328

Large-area, triple-junction a-Si alloy production scale-up. Semiannual subcontract report, 17 March 1993--18 September 1993  

DOE Green Energy (OSTI)

This report describes work to improve the efficiency of large-area, multi-junction amorphous silicon (a-Si) alloy modules. Equipment capable of producing modules up to 0.74 m{sup 2} in area is on line and process development has begun. Preliminary cost analysis/reduction has begun to ensure that these development efforts will result in a commercialization of the large-area technology. The approach was to transfer the high-efficiency multi-junction technology from R&D into the manufacturing environment by using three different substrate sizes. Initial attempts to transfer the multijunction silicon process were made using a 0.1-m{sup 2} substrate (approximately 1 ft{sup 2}). These efforts resulted in a module with a measured aperture area efficiency of 10.32%. Simultaneous with the transfer of the silicon technology, the most complicated aspect of the technology transfer, Solarex began process development techniques on large-area modules by using the 0.37-m{sup 2} substrates. These efforts resulted in modules with a total area efficiency of 7%. Finally, initial runs on substrates 0.74 m{sup 2} were made to debug the large-area equipment in preparation of transferring the knowledge gained in the processing of the smaller substrates.

Oswald, R.; O`Dowd, J.; Ashenfelter, W. [Solarex Corp., Newtown, PA (United States). Thin Film Div.] [and others

1994-03-01T23:59:59.000Z

329

Natural Gas Used as Feedstock for Hydrogen Production  

U.S. Energy Information Administration (EIA) Indexed Site

Used as Feedstock for Hydrogen Production Used as Feedstock for Hydrogen Production (Million Cubic Feet) Period: Annual Download Series History Download Series History Definitions, Sources & Notes Definitions, Sources & Notes Area 2008 2009 2010 2011 2012 View History U.S. 188,075 143,004 154,503 169,465 183,051 2008-2012 East Coast (PADD 1) 5,149 4,178 3,346 4,815 6,313 2008-2012 Midwest (PADD 2) 37,044 36,936 45,452 44,623 46,640 2008-2012 Gulf Coast (PADD 3) 80,291 41,049 43,170 50,968 62,829 2008-2012 Rocky Mountain (PADD 4) 12,747 11,904 12,047 12,896 12,595 2008-2012 West Coast (PADD 5) 52,844 48,937 50,488 56,163 54,674 2008-2012 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data.

330

Area Science Park | Open Energy Information  

Open Energy Info (EERE)

Area Science Park Jump to: navigation, search Name Area Science Park Place Italy Sector Services Product General Financial & Legal Services ( Government Public sector )...

331

Hydrogen, Fuel Cells, & Infrastructure - Program Areas - Energy...  

NLE Websites -- All DOE Office Websites (Extended Search)

fuel cell Welcome> Program Areas> Program Areas Hydrogen, Fuel Cells & Infrastructure Production & Delivery | Storage | Fuel Cell R&D | Systems Integration & Analysis | Safety...

332

DOE/EA-1583: Final Site-wide Environmental Assessment and Finding of No Significant Impact for Rocky Mountain Oilfield Testing Center/Naval Petroleum Reserve No. 3 (October 2008)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ROCKY MOUNTAIN OILFIELD TESTING CENTER / ROCKY MOUNTAIN OILFIELD TESTING CENTER / NAVAL PETROLEUM RESERVE NO. 3 FINAL Site-wide Environmental Assessment and Finding of No Significant Impact October 2008 U.S. Department of Energy Rocky Mountain Oilfield Testing Center 907 N. Poplar Street, Suite 150 Casper WY 82601 DOE/EA-1583 Rocky Mountain Oilfield Testing Center / Naval Petroleum Reserve No.3 Final Site-Wide Environmental Assessment i TABLE OF CONTENTS Section Page ABBREVIATIONS AND ACRONYMS.................................................................................................vii SUMMARY ................................................................................................................................................ix 1.0 INTRODUCTION .........................................................................................................................1

333

Research Areas  

NLE Websites -- All DOE Office Websites (Extended Search)

Areas Areas Research Areas Print Scientists from a wide variety of fields come to the ALS to perform experiements. Listed below are some of the most common research areas covered by ALS beamlines. Below each heading are a few examples of the specific types of topics included in that category. Click on a heading to learn more about that research area at the ALS. Energy Science Photovoltaics, photosynthesis, biofuels, energy storage, combustion, catalysis, carbon capture/sequestration. Bioscience General biology, structural biology. Materials/Condensed Matter Correlated materials, nanomaterials, magnetism, polymers, semiconductors, water, advanced materials. Physics Atomic, molecular, and optical (AMO) physics; accelerator physics. Chemistry Surfaces/interfaces, catalysts, chemical dynamics (gas-phase chemistry), crystallography, physical chemistry.

334

Module process optimization and device efficiency improvement for stable, low-cost, large-area, cadmium telluride-based photovoltaic module production  

DOE Green Energy (OSTI)

This report describes work under a three-year phased subcontract to develop CdS/CdTe devices and modules and to further improve the technology base at Photon Energy, Inc. (PEI) to better address the commercialization issues and objectives of the PEI and the US Department of Energy. During this reporting period we (1) achieved efficiencies of 12.7% on small area devices, (2) achieved 1-ft{sup 2} modules with over 8% aperture-area efficiency (and active area efficiencies up to {approximately}10%), (3) tested 4-ft{sup 2} modules at NREL at 23.1 (21.3) watts, normalized (6.3% efficiency), and (4) found no inherent stability problems with CdTe technology during life testing, at both NREL and PEI. 7 refs.

Albright, S.P.; Ackerman, B.; Chamberlin, R.R.; Jordan, J.F. (Photon Energy, Inc., El Paso, TX (United States))

1992-04-01T23:59:59.000Z

335

Sandstone consolidation analysis to delineate areas of high-quality reservoirs suitable for production of geopressured geothermal energy along the Texas Gulf Coast  

DOE Green Energy (OSTI)

Analysis of reservoir quality of lower Tertiary sandstones along the Texas Gulf Coast delineates areas most favorable for geopressured geothermal exploration. Reservoir quality is determined by whole core, acoustic log, and petrographic analyses. The Wilcox Group has good reservoir potential for geopressured geothermal energy in the Middle Texas Gulf Coast and possibly in adjacent areas, but other Wilcox areas are marginal. The Vicksburg Formation in the Lower Texas Gulf Coast is not prospective. Reservoir quality in the Frio Formation increases from very poor in lowermost Texas, to marginal into the Middle Texas Gulf Coast and to good through the Upper Texas Gulf Coast. The Frio Formation in the Upper Texas Gulf Coast has the best deep-reservoir quality of any unit along the Texas Gulf Coast. (MHR)

Loucks, R.G.; Dodge, M.M.; Galloway, W.E.

1979-01-01T23:59:59.000Z

336

Final Report_Production Hydrualic Packer Test.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

CENTER CENTER Production Hydraulic Packer Field Test i DOE/RMOTC/020120 PRODUCTION HYDRAULIC PACKER FIELD TEST Field Report for the period of October 21, 1999 - November 01, 1999 Date Published: June 30, 2000 Tricia Schneller, Halliburton Energy Services Jose Salas, RMOTC (PDVSA, Venezuela) PREPARED FOR THE U.S. DEPARTMENT OF ENERGY ROCKY MOUNTAIN OILFIELD TESTING CENTER Work Performed Under Rocky Mountain Oilfield Testing Center (RMOTC) CRADA No. 2000-001 PROTECTED CRADA INFORMATION This product contains Protected CRADA Information which was produced on June 30, 2000 under CRADA No. 2000-001 and is not to be further disclosed for a period of 5 years from the date it was produced except as expressly provided for in the CRADA. Distribution E. Further dissemination authorized to the Department of Energy

337

Equipment evaluation for low density polyethylene encapsulated nitrate salt waste at the Rocky Flats Plant  

SciTech Connect

Mixed wastes at the Rocky Flats Plant (RFP) are subject to regulation by the Resource Conservation and Recovery Act (RCRA). Polymer solidification is being developed as a final treatment technology for several of these mixed wastes, including nitrate salts. Encapsulation nitrate salts with low density polyethylene (LDPE) has been the preliminary focus of the RFP polymer solidification effort. Literature reviews, industry surveys, and lab-scale and pilot-scale tests have been conducted to evaluate several options for encapsulating nitrate salts with LDPE. Most of the effort has focused on identifying compatible drying and extrusion technologies. Other processing options, specifically meltration and non-heated compounding machines, were also investigated. The best approach appears to be pretreatment of the nitrate salt waste brine in either a vertical or horizontal thin film evaporator followed by compounding of the dried waste with LDPE in an intermeshing, co-rotating, twin-screw extruder. Additional pilot-scale tests planned for the fall of 1993 should further support this recommendation. Preliminary evaluation work indicates that meltration is not possible at atmospheric pressure with the LDPE (Chevron PE-1409) provided by RFP. However, meltration should be possible at atmospheric pressure using another LDPE formulation with altered physical and rheological properties: Lower molecular weight and lower viscosity (Epoline C-15). Contract modifications are now in process to allow a follow-on pilot scale demonstration. Questions regarding changed safety and physical properties of the resultant LDPE waste form due to use of the Epoline C-15 will be addressed. No additional work with non-heated mixer compounder machines is planned at this time.

Yamada, W.I.; Faucette, A.M.; Jantzen, R.C.; Logsdon, B.W.; Oldham, J.H.; Saiki, D.M.; Yudnich, R.J.

1993-08-30T23:59:59.000Z

338

Large eddy simultations of the atmospheric boundary layer east of the Colorado Rockies  

SciTech Connect

Large eddy simulation, LES, has often been carried out for the idealized situation of a simple convective boundary layer. Studies of dual Doppler radar and aircraft data from the Phoenix II experiment indicate that the boundary layer of the Colorado High Plains is not a purely convective boundary layer and it is influenced by the mountains to the west. The purpose of this study is to investigate the atmospheric boundary layer on one particular day on the Colorado High Plains. This research applies a LES nested within larger grids, which contain realistic topography and can simulate the larger-scale circulations initiated by the presence of the mountain barrier. How and to what extent the atmospheric boundary layer of the Colorado High Plains is influenced by larger scale circulations and other phenomena associated with the mountain barrier to the west is investigated. The nested grid LES reproduces the characteristics of the atmosphere for the case study day reasonably well. The mountains influence the atmospheric boundary layer over the plains to the east in several ways. The mountains contribute to the vertical shear of the horizontal winds through the thermally-induced mountain-plains circulation. As a consequence of the wind shear, the boundary layer that develops over the mountains is advected eastward over the top of the plains boundary layer, which is developing separately. This layer is marked by a mixture of gravity waves and turbulence and is atypical of a purely convective boundary layer. Just below this layer, the capping inversion of the plains boundary layer is weak and poorly defined compared to the inversions capping purely convective boundary layers. Gravity waves, triggered by the obstacle of the Rocky Mountains and by convection in the mountain boundary layer, also influence the atmosphere above the Colorado High Plains. These influences are found to have significant effects on the turbulence statistics and the energy spectra.

Costigan, K.R.; Cotton, W.R.

1992-10-22T23:59:59.000Z

339

Large-area triple-junction a-Si alloy production scale up. Annual subcontract report, 17 March 1992--18 March 1993  

DOE Green Energy (OSTI)

The objective of this subcontract over its three-year duration is to advance Solarex`s photovoltaic manufacturing technologies, reduce its a-Si:H module production costs, increase module performance and expand the Solarex commercial production capacity. Solarex shall meet these objectives by improving the deposition and quality of the transparent front contact; optimizing the laser patterning process; scaling up the semiconductor deposition process; improving the back contact deposition; and scaling up and improving the encapsulation and testing of its a-Si:H modules. In the Phase 1 portion of this subcontract Solarex focused on scaling up components of the chemical vapor deposition system for deposition of the front contact, scaling up laser scribing techniques; triple-junction recipes for module production; and metal oxide back contacts. These efforts resulted in adopting portions of the manufacturing line to handle substrates larger than 0.37 m{sup 2}.

Oswald, R.; O`Dowd, J. [Solarex Corp., Newtown, PA (United States). Thin Film Division

1994-01-01T23:59:59.000Z

340

Large-area, triple-junction a-Si alloy production scale-up. Semiannual technical progress report, 17 March 1992--18 September 1992  

DOE Green Energy (OSTI)

This report describes Solarex`s work to advance its photovoltaic manufacturing technologies, reduce its a-Si:H module production costs, increase module performance, and expand the Solarex commercial production capacity. Solarex will meet these objectives by improving the deposition and quality of the transport front contact; optimizing the laser patterning process; scaling up the semiconductor deposition process; improving the back-contact deposition; and scaling up and improving the encapsulation and testing of its a-Si:H modules. In the Phase 1 portion of this subcontract, Solarex focused on scaling up components of the chemical vapor deposition system for deposition of the system contact, scaling up laser scribing techniques; triple-junction recipes for module production; and metal-oxide back contacts. The goal of these efforts is to adopt all portions of the manufacturing line to handle substrates larger than 0.37 m{sup 2}.

Oswald, R.; O`Dowd, J. [Solarex Corp., Newtown, PA (United States). Thin Film Div.

1993-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "rockies area product" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Research Areas  

NLE Websites -- All DOE Office Websites (Extended Search)

Research Areas Print Research Areas Print Scientists from a wide variety of fields come to the ALS to perform experiements. Listed below are some of the most common research areas covered by ALS beamlines. Below each heading are a few examples of the specific types of topics included in that category. Click on a heading to learn more about that research area at the ALS. Energy Science Photovoltaics, photosynthesis, biofuels, energy storage, combustion, catalysis, carbon capture/sequestration. Bioscience General biology, structural biology. Materials/Condensed Matter Correlated materials, nanomaterials, magnetism, polymers, semiconductors, water, advanced materials. Physics Atomic, molecular, and optical (AMO) physics; accelerator physics. Chemistry Surfaces/interfaces, catalysts, chemical dynamics (gas-phase chemistry), crystallography, physical chemistry.

342

NSTB Summarizes Vulnerable Areas  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NSTB Summarizes Vulnerable Areas NSTB Summarizes Vulnerable Areas Commonly Found in Energy Control Systems Experts at the National SCADA Test Bed (NSTB) discovered some common areas of vulnerability in the energy control systems assessed between late 2004 and early 2006. These vulnerabilities ranged from conventional IT security issues to specific weaknesses in control system protocols. The paper "Lessons Learned from Cyber Security Assessments of SCADA and Energy Management Systems" describes the vulnerabilities and recommended strategies for mitigating them. It should be of use to asset owners and operators, control system vendors, system integrators, and third-party vendors interested in enhancing the security characteristics of current and future products.

343

Report on "Audit of the Contractor Incentive Programs at the Rocky Flats Environmental Technology Site, IG-0411  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 13, 1997 MEMORANDUM FOR THE SECRETARY FROM: John C. Layton Inspector General SUBJECT: INFORMATION: Report on "Audit of the Contractor Incentive Programs at the Rocky Flats Environmental Technology Site" BACKGROUND: The Department of Energy (Department) is using performance-based contracts to solve problems associated with its traditional management and operating contracts. These performance-based contracts are to include cost reduction incentive programs to motivate contractors to reduce costs by employing innovative practices. Additionally, these contracts are to encourage and reward superior, results-oriented performance through a clearly

344

Evaluating, Migrating, and Consolidating Databases and Applications for Long-Term Surveillance and Maintenance Activities at the Rocky Flats Site  

SciTech Connect

The U.S. Department of Energy (DOE) Office of Legacy Management (LM) is assuming responsibilities for long-term surveillance and maintenance (LTS and M) activities at the Rocky Flats Environmental Technology Site (RFETS) during fiscal year 2006. During the transition, LM is consolidating databases and applications that support these various functions into a few applications which will streamline future management and retrieval of data. This paper discussed the process of evaluating, migrating, and consolidating these databases and applications for LTS and M activities and provides lessons learned that will benefit future transitions. (authors)

Surovchak, S. [U.S. Department of Energy, Office of Legacy Management, Broomfield, Colorado (United States); Marutzky, S.; Thompson, B.; Miller, K.; Labonte, E. [S.M. Stoller Corporation, Grand Junction, Colorado (United States)

2006-07-01T23:59:59.000Z

345

Microsoft Word - ARP-III press release Final _2_.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

Subsurface Disposal Area (SDA) called Pit 4. These materials originated at the Rocky Flats Plant near Denver, Colorado, during nuclear weapons production activities in the...

346

AREA SESS  

E-Print Network (OSTI)

1. This standard is approved for use by all Departments and Agencies of the Department of Defense (DoD). 2. This issue of MIL-STD-130 provides further clarification and increased insight and guidance for the implementation of machine-readable information (MRI) processes for item identification marking and facilitating automatic data capture. Based solely on non-Government standards, MRI provides a valuable tool for life-cycle asset management from acquisition through manufacture to logistics and final disposition. However, the application of free text information item identification marking is still necessary for many end users of the identified item. Finding the most effective use of both marking protocols, either singly or in combination, is the prime responsibility of the acquiring activity. 3. This standard provides the criteria by which product designers develop specific item identification marking requirements. Product designers must include in product definition data the specific requirements as to marking content, size, location, and application process. Simply stating in the product definition data that the marking be in accordance with this standard is not sufficient for initial manufacture and subsequent production of replenishment spare items.

unknown authors

2004-01-01T23:59:59.000Z

347

Prospects for hydrogen production by water electrolysis to be competitive with conventional methods. [Areas of research to reduce capital costs and approach 100 percent energy efficiencies  

SciTech Connect

With the impending unavailability of oil and natural gas, hydrogen will be produced on a large scale in the United States (1) from coal, or (2) by water electrolysis using electricity derived from nuclear or solar energy. In many parts of the world which lack fossil fuels, the latter will be the only possible method. The cost of purification of hydrogen produced from fossil fuels will increase its cost to about the same level as that of electrolytic hydrogen. When hydrogen is required in relatively small quantities too, the electrolytic method is advantageous. To minimize the cost of hydrogen produced by water electrolysis, it is necessary to reduce capital costs and approach 100 percent energy efficiencies. Areas of research, which will be necessary to achieve these goals are: (1) maximization of surface areas of electrodes; (2) use of thin electrolyte layers; (3) increase of operating temperature in alkaline water electrolysis cells to about 120-150/sup 0/C; (4) selection and evaluation of separator materials; (5) electrocatalysis of the hydrogen and oxygen electrode reaction; (6) mixed oxides as oxygen electrodes; and (7) photoelectrochemical effects. The progress made to date and proposed studies on these topics are briefly dealt with in this paper. The General Electric Solid Polymer Water Electrolyzer and Teledyne Alkaline Water Electrolysis Cells, both operating at about 120-150/sup 0/C, look mostpromising in achieving the goals of low capital cost and high energy efficiency. (auth)

Srinivasan, S.; Salzano, F.J.

1976-01-01T23:59:59.000Z

348

Analysis and evaluation in the production process and equipment area of the low-cost solar-array project. Quarterly report, July-October, 1980  

DOE Green Energy (OSTI)

The attributes of the various metallization processes have been investigated which express themselves in economic results. It has been shown that several metallization process sequences will lead to adequate metallization for large area, high performance solar cells at a metallization add-on price in the range of $6.- to 12.-/m/sup 2/, or 4 to 8 cents/W(peak), assuming 15% efficiency. Conduction layer formation by thick film silver or by tin or tin/lead solder leads to metallization add-on prices significantly above the $6.- to 12.-/m/sup 2/ range. The wet chemical processes of electroless and electrolytic plating for strike/barrier layer and conduction layer formation, respectively, seem to be most cost-effective. Vacuum deposition of the strike/barrier layer can be competitive with electroless plating.

Wolf, M.; Goldman, H.

1981-01-01T23:59:59.000Z

349

Module process optimization and device efficiency improvement for stable, low-cost, large-area, cadmium telluride-based photovoltaic module production. Final subcontract report, 1 July 1990--30 April 1994  

DOE Green Energy (OSTI)

This report describes work performed under a three-phase subcontract. The objectives of the program include (1) achievement of active-area efficiencies of greater than 14% on small cells; (2) achievement of aperture-area efficiencies of greater than 13% on 0.09-m{sup 2} (1 ft{sup 2}) modules; (3) achievement of aperture-area efficiencies of greater than 12.5% on 0.37-m{sup 2} (4 ft{sup 2}) modules; and achievement of greater than 20-year module life (based on life testing extrapolations) with no greater than 10% efficiency degradation. The results obtained and described herein include the following: (1) efficiencies of 12.7% were achieved on small-area devices; (2) 0.09-m{sup 2} (1 ft{sup 2}) modules achieved greater than 8% aperture-area efficiency, but work for further efficiency improvement was redirected toward the 0.37-M{sup 2} (4 if) modules; (3) 0.37-m{sup 2} (4 ft{sup 2}) modules achieved 26.5-W output, which calculates to 8.0% aperture-area efficiency; (4) consistent prototype production was focused on and substantially achieved within Phase 2; (5) life testing at the National Renewable Energy Laboratory showed no inherent stability problems with the CdTe technology, and the accuracy of module measurement was satisfactorily resolved; and (6) a ``cradle-to-cradle`` recycling program was begun based upon the philosophy that the establishment of such mechanisms will be required to ensure maximum recapture and recycling of all manufacturing waste materials and/or modules returned from the field.

Albright, S.P.; Johnson, S.X. [Golden Photon, Inc., CO (United States)

1994-06-01T23:59:59.000Z

350

Radiological Areas  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Revision to Clearance Policy Associated with Recycle of Scrap Metals Originating from Revision to Clearance Policy Associated with Recycle of Scrap Metals Originating from Radiological Areas On July 13, 2000, the Secretary of Energy imposed an agency-wide suspension on the unrestricted release of scrap metal originating from radiological areas at Department of Energy (DOE) facilities for the purpose of recycling. The suspension was imposed in response to concerns from the general public and industry groups about the potential effects of radioactivity in or on material released in accordance with requirements established in DOE Order 5400.5, Radiation Protection of the Public and Environment. The suspension was to remain in force until DOE developed and implemented improvements in, and better informed the public about, its release process. In addition, in 2001 the DOE announced its intention to prepare a

351

MODIS Land Products Subsets  

NLE Websites -- All DOE Office Websites (Extended Search)

ORNL DAAC MODIS Land Product Subsets MODIS Collection 5 Global Subsetting and Visualization Tool Create subset for user selected site, area, product, and time period. Data for...

352

Report on Matters Identified at the Rocky Flats Field Office During the Audit of the Department's Consolidated Fiscal Year 1996 Financial Statements, WR-FS-97-03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY OFFICE OF INSPECTOR GENERAL REPORT ON MATTERS IDENTIFIED AT THE ROCKY FLATS FIELD OFFICE DURING THE AUDIT OF THE DEPARTMENTmS CONSOLIDATED FISCAL YEAR 1996 FINANCIAL STATEMENTS The Office of Inspector General wants to make the distribution of its audit reports as customer friendly and cost effective as

353

An Innovative Approach for the Calculation of Exposure Point Concentrations for Large Areas of Surface Radionuclide Contamination  

SciTech Connect

The Department of Energy Rocky Flats site was designated as a wildlife refuge by the Rocky Flats National Wildlife Refuge Act of 2001. Rocky Flats was considered to be one of the most highly contaminated radiological sites in the country. Some portions of the site have low-level radionuclide contamination in surface soils. A site-wide risk and dose assessment to evaluate threats to human health and the environment were performed, so that the site could be released for this land use. The aggressive accelerated action program combined with defensible and innovative risk assessment methods resulted in there being no radionuclides of concern in the final comprehensive risk assessment (DOE 2006). An innovative approach for delineating functional exposure areas and area-weighted exposure point concentration-activities (EPCs) was negotiated with the regulatory agencies in Colorado. This procedure leads to realistic estimates of risk and dose to workers and visitors. This innovative approach to the calculation of EPCs was negotiated with both State and Federal regulators. The value of developing and maintaining good working relationships with regulators responsible for a site can not be overestimated. The building of trust and confidence among responsible parties and regulators is essential for the development and implementation of innovative methods and technologies.

Winchester Chromec, F.; Myers, Jeffrey C. [7800 E. Union Avenue, Denver, Colorado, 801237 (United States)

2008-01-15T23:59:59.000Z

354

U.S. Refiner Petroleum Product Prices  

U.S. Energy Information Administration (EIA) Indexed Site

Area: U.S. East Coast (PADD 1) New England (PADD 1A) Connecticut Maine Massachusetts New Hampshire Rhode Island Vermont Central Atlantic (PADD 1B) Delaware District of Columbia Maryland New Jersey New York Pennsylvania Lower Atlantic (PADD 1C) Florida Georgia North Carolina South Carolina Virginia West Virginia Midwest (PADD 2) Illinois Indiana Iowa Kansas Kentucky Michigan Minnesota Missouri Nebraska North Dakota Ohio Oklahoma South Dakota Tennessee Wisconsin Gulf Coast (PADD 3) Alabama Arkansas Louisiana Mississippi New Mexico Texas Rocky Mountain (PADD 4) Colorado Idaho Montana Utah Wyoming West Coast (PADD 5) Alaska Arizona California Hawaii Nevada Oregon Washington Period: Monthly Annual

355

Implementation of Revision 19 of the TRUPACT-II Safety Analysis Report at Rocky Flats Environmental Technology Site  

Science Conference Proceedings (OSTI)

The U.S. Nuclear Regulatory Commission on July 27, 2001 approved Revision 19 of the TRUPACT-II Safety Analysis Report (SAR) and the associated TRUPACT-II Authorized Methods for Payload Control (TRAMPAC). Key initiatives in Revision 19 included matrix depletion, unlimited mixing of shipping categories, a flammability assessment methodology, and an alternative methodology for the determination of flammable gas generation rates. All U.S. Department of Energy (DOE) sites shipping transuranic (TRU) waste to the Waste Isolation Pilot Plant (WIPP) were required to implement Revision 19 methodology into their characterization and waste transportation programs by May 20, 2002. An implementation process was demonstrated by the Rocky Flats Environmental Technology Site (RFETS) in Golden, Colorado. The three-part process used by RFETS included revision of the site-specific TRAMPAC, an evaluation of the contact-handled TRU waste inventory against the regulations in Revision 19, and design and development of software to facilitate future inventory analyses.

D'Amico, E.; O'Leary, J.; Bell, S.; Djordjevic, S.; Givens, C,; Shokes, T.; Thompson, S.; Stahl, S.

2003-02-25T23:59:59.000Z

356

Gas reservoir sweet spot detection and delineation in Rocky Mountain laramide basins. Topical report, May 1993-March 1996  

SciTech Connect

The determination of the position and configuration of the pressure boundary between normal and anomalously pressured regimes, and the detection and delineation of porosity/permeability `sweet spots` below this boundary are the two most important elements in exploring for basin-center or deep-basin gas in Rocky Mountain Laramide Basins. These two exploration elements from the basis for a new exploration paradigm. To utilize this new paradigm, the following tasks need to be included in the exploration strategy: (1) determine the position of the pressure boundary; (2) evaluate the three-dimensional aspects of the pressure boundary surface; (3) determine which depositional facies has the greatest potential for enhances storage capacity and deliverability below the pressure boundary; (4) document the determinative factors that control sweet spot development in the targeted lithofacies; and (5) detect and delineate sweet spots using 2-D and 3-D models of eletric log responses and seismic data.

Surdam, R.C.; Iverson, W.O.; Yin, P.

1995-10-01T23:59:59.000Z

357

Systematic Evaluation Program (SEP) at Rocky Flats Plant: An overview of practical management issues for evaluation of natural phenomena hazards  

Science Conference Proceedings (OSTI)

Many of the buildings at the Rocky Flats Plant were designed and built before modern standards were developed, including standards for protection against extreme natural phenomenon such as tornadoes, earthquakes, and floods. The purpose of the SEP is to establish an integrated approach to assessing the design adequacy of specific high and moderate hazard Rocky Flats facilities from a safety perspective and to establish a basis for defining any needed facility improvements. The SEP is to be carried out in three Phases. In Phase 1, topics to be evaluated and an evaluation plan for each topic were developed. Any differences between Current Design Requirements (CDR) or acceptance criteria and the design of existing facilities, will be identified during Phase 2 and assessed using an integrated systematic approach during Phase 3. The integrated assessment performed during Phase 3 provides a process for evaluating the differences between existing facility design and CDRs so that decisions on corrective actions can be made on the basis of relative risk reduction and cost effectiveness. These efforts will ensure that a balanced and integrated level of safety is achieved for long-term operation of these buildings. Through appropriate selection of topics and identification of the structures, systems, and components to be evaluated, the SEP will address outstanding design issues related to the prevention and mitigation of design basis accidents, including those arising from natural phenomena. The objective of the SEP is not to bring these buildings into strict compliance with current requirements, but rather to ensure that an adequate level of safety is achieved in an economical fashion.

Badwan, F.M. [EG and G Rocky Flats, Inc., Golden, CO (United States). Rocky Flats Plant; Herring, K.S. [NUS Corp. (United States)

1993-08-01T23:59:59.000Z

358

A cross-cultural analysis of the relationship between subsistence productivity and religious eschatology using data from the Human Relations Area Files: a test of a hypothesis drawn from the Marvin Harris' theory of Cultural Materialism  

E-Print Network (OSTI)

This thesis used a cross-cultural sample of ethnographic data collected from the Human Relations Area Files to test the hypothesis, drawn from Marvin Harris' theory of Cultural Materialism, that the presence of a judgmental eschatology (or fate of the soul after death) in a given society is positively correlated with the level of subsistence productivity in that society. Specifically, societies low on the scale of productive complexity were predicted to lack judgmental eschatologies, while societies high on the scale were predicted to have them. The final sample group consisted of 271 cultures, each of which was coded for level of subsistence productivity and for the nature of their eschatology. The level of subsistence productivity was measured in three ways: first, in terms of the broad subsistence classifications (collectors, hunters and fishers, incipient producers, etc.) defined by Alan Lomax in his article A Worldwide Evolutionary Classification of Cultures by Subsistence Systems (1977); secondly, by the percentage of total subsistence activity accounted for by agriculture; and finally, by the intensity of a culture's agricultural practices. The nature of a culture's eschatology was coded as either judgmental or non-judgmental. The coded data was then subjected to a Chi-Square test of significance, and to Pearson's, Spearman's, and Kendall's Tau-b tests to determine the correlation coefficient. Each test was performed three times - once for each of the three subsistence codes versus eschatology. In each case, the Chi-Square test rejected the null hypothesis (that there was no correlation between level of subsistence productivity and eschatology) at a 0.001 level of significance, thus supporting the conclusion that the presence of a judgmental eschatology in a given society is, in fact, related to the level of subsistence productivity in that society. The correlation coefficients ranged from 0.331-0.469, and were all significant at the 0.0001 level. Thus, the proposed hypothesis, and in turn the theory of Cultural Materialism from which it was drawn, were supported by the data, suggesting that the nature of religious beliefs are, at least in part, a product of a culture's subsistence system.

Olson, Jeffery Soland

2000-01-01T23:59:59.000Z

359

Landfill stabilization focus area: Technology summary  

SciTech Connect

Landfills within the DOE Complex as of 1990 are estimated to contain 3 million cubic meters of buried waste. The DOE facilities where the waste is predominantly located are at Hanford, the Savannah River Site (SRS), the Idaho National Engineering Laboratory (INEL), the Los Alamos National Laboratory (LANL), the Oak Ridge Reservation (ORR), the Nevada Test Site (NTS), and the Rocky Flats Plant (RFP). Landfills include buried waste, whether on pads or in trenches, sumps, ponds, pits, cribs, heaps and piles, auger holes, caissons, and sanitary landfills. Approximately half of all DOE buried waste was disposed of before 1970. Disposal regulations at that time permitted the commingling of various types of waste (i.e., transuranic, low-level radioactive, hazardous). As a result, much of the buried waste throughout the DOE Complex is presently believed to be contaminated with both hazardous and radioactive materials. DOE buried waste typically includes transuranic-contaminated radioactive waste (TRU), low-level radioactive waste (LLW), hazardous waste per 40 CFR 26 1, greater-than-class-C waste per CFR 61 55 (GTCC), mixed TRU waste, and mixed LLW. The mission of the Landfill Stabilization Focus Area is to develop, demonstrate, and deliver safer,more cost-effective and efficient technologies which satisfy DOE site needs for the remediation and management of landfills. The LSFA is structured into five technology areas to meet the landfill remediation and management needs across the DOE complex. These technology areas are: assessment, retrieval, treatment, containment, and stabilization. Technical tasks in each of these areas are reviewed.

NONE

1995-06-01T23:59:59.000Z

360

AREA USA LLC | Open Energy Information  

Open Energy Info (EERE)

AREA USA LLC Jump to: navigation, search Name AREA USA LLC Place Washington, DC Zip 20004 Sector Services Product Washington, D.C.-based division of Fabiani & Company providing...

Note: This page contains sample records for the topic "rockies area product" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

2. Access to Supplies and Production Areas  

U.S. Energy Information Administration (EIA)

improved well completions, advanced stimulation technology, ... Cross-well seismic measures the vibrations detected in one or more wells when wide-

362

Design Criteria and Construction of a Capillary Barrier Cover System: The Rocky Mountain Arsenal Experience  

E-Print Network (OSTI)

and is subject to RCRA closure standards addressed in this plan. 4 #12;TA 54 Area G Landfill Closure/Post-Closure 124 received hazardous waste after November 19, 1980. Hence, it is subject to RCRA closure standards Protection Division-Water Quality and RCRA Group and at the DOE Los Alamos Site Office. 5.2 Pre-Closure

Zornberg, Jorge G.

363

NATIVE MYCORRHIZAL FUNGI WITH ASPEN ON SMELTER-IMPACTED SITES IN THE NORTHERN ROCKY MOUNTAINS  

E-Print Network (OSTI)

Ridge of Butte (MT), behind the smelter stack at Anaconda (MT), near the (removed) smelter in Kellogg stack at Anaconda, MT (inactive copper smelter), at the (removed) lead smelter at Kellogg, ID, and along regenerating south of the Anaconda Superfund site. Aspen is able to colonize these areas due to mutualistic

Cripps, Cathy

364

The Influence of the Rocky Mountain on the 1314 April 1986 Severe Weather Outbreak. Part I: Mesoscale Lee Cyclogenesis and Its Relationship to Severe Weather and Dust Storms  

Science Conference Proceedings (OSTI)

In this first of a two paper series, a sequence of dynamical processes involving the evolution of a mesoscale Ice cyclone and its subsequent interaction with a mesoscale tropopause fold downstream of the Rocky Mountains is investigated. These ...

V. Mohan Karyampudi; Michael L. Kaplan; Steven E. Koch; Robert J. Zamora

1995-05-01T23:59:59.000Z

365

The Influence of the Rocky Mountains on the 1314 April 1986 Severe Weather Outbreak. Part II: Evolution of a Prefrontal Bore and Its Role in Triggering a Squall Line  

Science Conference Proceedings (OSTI)

In this paper, Part II of a series, the evolution of a prefrontal bore on the leeside of the Rockies and its subsequent propagation and initiation of convection farther downstream over eastern Colorado and western Nebraska are investigated. The ...

V. Mohan Karyampudi; Steven E. Koch; Chaing Chen; James W. Rottman; Michael L. Kaplan

1995-05-01T23:59:59.000Z

366

Organization and Structure of Clouds and Precipitation on the Mid-Atlantic Coast of the United States. Part I: Synoptic Evolution of a Frontal System from the Rockies to the Atlantic Coast  

Science Conference Proceedings (OSTI)

The frontal structure of a cyclone that developed in the lee of the Rocky Mountains and moved eastward across the United States is examined. The evolutions and interactions of three frontal features are traced: the primary cold front, a shallow ...

John D. Locatelli; Joseph M. Sienkiewicz; Peter V. Hobbs

1989-05-01T23:59:59.000Z

367

Weekly Refiner Net Production  

U.S. Energy Information Administration (EIA) Indexed Site

Refiner Net Production Refiner Net Production (Thousand Barrels per Day) Period: Weekly 4-Week Average Download Series History Download Series History Definitions, Sources & Notes Definitions, Sources & Notes Product/Region 11/08/13 11/15/13 11/22/13 11/29/13 12/06/13 12/13/13 View History Finished Motor Gasoline 2,168 2,300 2,336 2,359 2,462 2,368 2010-2013 East Coast (PADD 1) 54 53 52 67 71 67 2010-2013 Midwest (PADD 2) 696 745 722 711 798 790 2010-2013 Gulf Coast (PADD 3) 891 916 1,010 1,053 1,011 1,021 2010-2013 Rocky Mountain (PADD 4) 260 248 245 232 279 235 2010-2013 West Coast (PADD 5) 268 338 308 296 302 255 2010-2013 Reformulated 50 49 49 49 48 49 2010-2013 Blended with Ethanol 50 49 49 49 48 49 2010-2013 Other

368

Rangely Oilfield Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Well Field Information Development Area: Number of Production Wells: Number of Injection Wells: Number of Replacement Wells: Average Temperature of Geofluid: Sanyal...

369

Haleakala Volcano Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Well Field Information Development Area: Number of Production Wells: Number of Injection Wells: Number of Replacement Wells: Average Temperature of Geofluid: Sanyal...

370

A Statistical Analysis Of Bottom-Hole Temperature Data In The Hinton Area  

Open Energy Info (EERE)

A Statistical Analysis Of Bottom-Hole Temperature Data In The Hinton Area A Statistical Analysis Of Bottom-Hole Temperature Data In The Hinton Area Of West-Central Alberta Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Journal Article: A Statistical Analysis Of Bottom-Hole Temperature Data In The Hinton Area Of West-Central Alberta Details Activities (0) Areas (0) Regions (0) Abstract: Considerable differences in the spread of bottom-hole temperature values from petroleum exploration well logs plotted as a function of depth are observed over a region of west-central Alberta. The spatial variation of the spread is investigated, and it is found to be greater toward the Rocky Mountain disturbed belt in the west. The spatial variation there does not seem to correspond directly to local topography, and may be partly due

371

Regional operations research program for commercialization of geothermal energy in the Rocky Mountain Basin and Range. Final report, August 1, 1978-February 28, 1980  

DOE Green Energy (OSTI)

The work accomplished from August 1978 to February 1980 in the Regional Operations Research efforts for the Rocky Mountain Basin and Range Geothermal Commercialization Program are described. The work included continued data acquisition and extension of the data base, enhancement and refinement of the economic models for electric and direct use applications, site-specific and aggregated analyses in support of the state teams and special analyses in support of several federal agencies.

Marlin, J.M.; Cunniff, R.; McDevitt, P.; Nowotny, K.; O'Dea, P.

1981-01-01T23:59:59.000Z

372

Geology and mineral resources of the Florence, Beaufort, Rocky Mount, and Norfolk 1/sup 0/ x 2/sup 0/ NTMS quadrangles. National Uranium Resource Evaluation program  

Science Conference Proceedings (OSTI)

This document provides geologic and mineral resources data for previously-issued Savannah River Laboratory hydrogeochemical and stream sediment reports of the Beaufort, Florence, Norfolk, and Rocky Mount 1/sup 0/ x 2/sup 0/ National Topographic Map Series quadrangles in the southeastern United States. This report is issued in draft form, without detailed technical and copy editing. This was done to make the report available to the public before the end of the National Uranium Resource Evaluation program.

Harris, W.B.

1982-08-01T23:59:59.000Z

373

Tampa Bay Area Ethanol Consortium | Open Energy Information  

Open Energy Info (EERE)

Tampa Bay Area Ethanol Consortium Jump to: navigation, search Name Tampa Bay Area Ethanol Consortium Place Tampa, Florida Sector Biomass Product Consortium researching ethanol from...

374

Evaluation of atmospheric transport models for use in Phase II of the historical public exposures studies at the Rocky Flats Plant  

Science Conference Proceedings (OSTI)

Five atmospheric transport models were evaluated for use in Phase II of the Historical Public Exposures Studies at the Rocky Flats Plant. Models included a simple straight-line Gaussian plume model (ISCST2), several integrated puff models (RATCHET, TRIAD, and INPUFF2), and a complex terrain model (TRAC). Evaluations were based on how well model predictions compared with sulfur hexafluoride tracer measurements taken in the vicinity of Rocky Flats in February 1991. Twelve separate tracer experiments were conducted, each lasting 9 hr and measured at 140 samplers in arcs 8 and 16 km from the release point at Rocky Flats. Four modeling objectives were defined based on the endpoints of the overall study: (1) the unpaired maximum hourly average concentration, (2) paired time-averaged concentration, (3) unpaired time-averaged concentration, and (4) arc-integrated concentration. Performance measures were used to evaluate models and focused on the geometric mean and standard deviation of the predicted-to-observed ratio and the correlation coefficient between predicted and observed concentrations. No one model consistently outperformed the others in all modeling objectives and performance measures. The overall performance of the RATCHET model was somewhat better than the other models.

Rood, A.S.; Killough, G.G.; Till, J.E.

1999-08-01T23:59:59.000Z

375

Greater Boston Area | Open Energy Information  

Open Energy Info (EERE)

Greater Boston Area Greater Boston Area Jump to: navigation, search Contents 1 Clean Energy Clusters in the Greater Boston Area 1.1 Products and Services in the Greater Boston Area 1.2 Research and Development Institutions in the Greater Boston Area 1.3 Networking Organizations in the Greater Boston Area 1.4 Investors and Financial Organizations in the Greater Boston Area 1.5 Policy Organizations in the Greater Boston Area Clean Energy Clusters in the Greater Boston Area Products and Services in the Greater Boston Area Loading map... {"format":"googlemaps3","type":"ROADMAP","types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"limit":500,"offset":0,"link":"all","sort":[""],"order":[],"headers":"show","mainlabel":"","intro":"","outro":"","searchlabel":"\u2026

376

Southern CA Area | Open Energy Information  

Open Energy Info (EERE)

Southern CA Area Southern CA Area Jump to: navigation, search Contents 1 Clean Energy Clusters in the Southern CA Area 1.1 Products and Services in the Southern CA Area 1.2 Research and Development Institutions in the Southern CA Area 1.3 Networking Organizations in the Southern CA Area 1.4 Investors and Financial Organizations in the Southern CA Area 1.5 Policy Organizations in the Southern CA Area Clean Energy Clusters in the Southern CA Area Products and Services in the Southern CA Area Loading map... {"format":"googlemaps3","type":"ROADMAP","types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"limit":500,"offset":0,"link":"all","sort":[""],"order":[],"headers":"show","mainlabel":"","intro":"","outro":"","searchlabel":"\u2026

377

Pacific Northwest Area | Open Energy Information  

Open Energy Info (EERE)

Pacific Northwest Area Pacific Northwest Area Jump to: navigation, search Contents 1 Clean Energy Clusters in the Pacific Northwest Area 1.1 Products and Services in the Pacific Northwest Area 1.2 Research and Development Institutions in the Pacific Northwest Area 1.3 Networking Organizations in the Pacific Northwest Area 1.4 Investors and Financial Organizations in the Pacific Northwest Area 1.5 Policy Organizations in the Pacific Northwest Area Clean Energy Clusters in the Pacific Northwest Area Products and Services in the Pacific Northwest Area Loading map... {"format":"googlemaps3","type":"ROADMAP","types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"limit":500,"offset":0,"link":"all","sort":[""],"order":[],"headers":"show","mainlabel":"","intro":"","outro":"","searchlabel":"\u2026

378

History of the production complex: The methods of site selection  

SciTech Connect

Experience taught the Atomic Energy Commission how to select the best possible sites for its production facilities. AEC officials learned from the precedents set by the wartime Manhattan Project and from their own mistakes in the immediate postwar years. This volume discusses several site selections. The sites covered are: (1) the Hanford Reservation, (2) the Idaho reactor site, (3) the Savannah River Plant, (4) the Paducah Gaseous Diffusion Plant, (5) the Portsmouth Gaseous Diffusion Plant, (6) the Fernald Production Center, (7) the PANTEX and Spoon River Plants, (8) the Rocky Flats Fabrication Facility, and (9) the Miamisburg and Pinellas plants. (JDH)

1987-09-01T23:59:59.000Z

379

Fire hazard analysis of Rocky Flats Building 776/777 duct systems  

SciTech Connect

The objective of this analysis is to determine if ventilation ductwork in Building 776/777 will maintain their structural integrity during expected fire conditions as well as standard design fires typically used to ascertain fire resistance ratings. If the analysis shows that ductwork will not maintain structural integrity, the impact of this failure will be determined and analyzed, and alternative solutions recommended. Associated with this analysis is the development of a computer fire model which can be used as an engineering tool in analyzing the effect of fires on ductwork in other areas and buildings.

DiNenno, P.J.; Scheffey, J.L.; Gewain, R.G.; Shanley, J.H. Jr. [Hughes Associates, Inc., Wheaton, MD (United States)

1988-12-01T23:59:59.000Z

380

Coal Production | OpenEI  

Open Energy Info (EERE)

03 03 Varnish cache server Browse Upload data GDR 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142279603 Varnish cache server Coal Production Dataset Summary Description This dataset comes from the Energy Information Administration (EIA), and is part of the 2011 Annual Energy Outlook Report (AEO2011). This dataset is Table 140, and contains only the reference case. The unit of measurement in this dataset is million short tons. The data is broken down into northern Appalachia, central Appalachia, southern Appalachia, eastern interior, western interior, gulf, Dakota medium, western montana, Wyoming, Rocky Mountain, Arizona/New Mexico and Washington/Alaska. Source EIA Date Released April 26th, 2011 (3 years ago)

Note: This page contains sample records for the topic "rockies area product" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Cost Estimating for Decommissioning of a Plutonium Facility--Lessons Learned From The Rocky Flats Building 771 Project  

Science Conference Proceedings (OSTI)

The Rocky Flats Closure Site is implementing an aggressive approach in an attempt to complete Site closure by 2006. The replanning effort to meet this goal required that the life-cycle decommissioning effort for the Site and for the major individual facilities be reexamined in detail. As part of the overall effort, the cost estimate for the Building 771 decommissioning project was revised to incorporate both actual cost data from a recently-completed similar project and detailed planning for all activities. This paper provides a brief overview of the replanning process and the original estimate, and then discusses the modifications to that estimate to reflect new data, methods, and planning rigor. It provides the new work breakdown structure and discusses the reasons for the final arrangement chosen. It follows with the process used to assign scope, cost, and schedule elements within the new structure, and development of the new code of accounts. Finally, it describes the project control methodology used to track the project, and provides lessons learned on cost tracking in the decommissioning environment.

Stevens, J. L.; Titus, R.; Sanford, P. C.

2002-02-26T23:59:59.000Z

382

The determination of PCBs in Rocky Flats Type IV waste sludge by gas chromatography/electron capture detection. Part 2  

SciTech Connect

Before disposal, radioactive sludge (Type IV) from Rocky Flats Plant (RFP) must be evaluated for polychlorinated biphenyl (PCB) content. The Type IV sludge consists of organic solvents, degreasers, cutting oils, and transuranic (TRU) waste mixed with calcium silicate (MicroCel E{reg_sign} and Oil Dri{reg_sign} to form a grease or paste-like material. For laboratory testing, a nonradioactive simulated Type 17V RFP sludge was prepared at Argonne National Laboratory-East (ANL-E). This sludge has a composition similar to that expected from field samples. In an earlier effort, a simplified method was developed for extraction, cleanup of extract, and determination of PCBs in samples of simulated sludge spiked with Aroclors 1254 and 1260. The simplified method has now been used to determine the presence and quantities of other Aroclors in the simulated sludge, namely, Aroclors 10 1 6, 1221, 1232, 1242, and 1248. The accuracy and precision of the data for these Aroclors were found to be similar to the data for sludges spiked with Aroclors 1254 and 1260. Since actual sludges may vary in composition, the method was also verified by analyzing another source of Type IV simulated sludge, prepared by Argonne National Laboratory-West (ANL-W).

Parish, K.J.; Applegate, D.V.; Postlethwait, P.D.; Boparai, A.S.; Reedy, G.T.

1994-12-01T23:59:59.000Z

383

Microsoft Word - CX-RockyReach-MapleValley_accessroad_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Darin Bowman Project Manager - TELF-TPP-3 Proposed Action: Access road repair including reconstructing, grading, and shaping of roads, placing and compacting of rock surfacing, installation of gates, installation and maintenance of erosion control and water drainage features, and restoration of disturbed areas. Budget Information: Work Order # 00263533 PP&A Project No.: 1977 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities... for...rights-of-way, infrastructures (e.g. roads)...routine maintenance activities, corrective...are required to maintain and preserve infrastructures...in a condition

384

Rocky Mountain Oilfield Testing Center RMOTC at the Naval Petroleum Reserve No. 3  

NLE Websites -- All DOE Office Websites (Extended Search)

OILFIELD TESTING OILFIELD TESTING OILFIELD TESTING CENTER CENTER 2 2 HISTORY OF TEAPOT DOME Mark Milliken 3 3 TEAPOT DOME LOCATION 4 4 Salt Creek 670 MMBBLS 722 BCF Teapot Dome 27 MMBBLS 57 BCF N P R - 3 Cumulative Production 5 5 The Great White Fleet December 1907 - February 1909 6 6 THE END OF COAL-FIRED SHIPS * 2-week cruising time. * Labor and time intensive cleaning and reloading. * At the mercy of foreign countries for coal supply. * 1912: All battleships will be oil-powered. Great White Fleet 7 7 NAVAL PETROLEUM RESERVES ARE BORN * 1908: Dr. Otis Smith, USGS Director, recommends DOI retain oil lands for fuel reserve for Navy. * 1909: Taft withdraws 3,000,000 acres in Wyoming and California. * 1910: Concern over the President's authority to withdraw lands, so Congress passed the Pickett Act. * 1910: Taft issues a 2nd land withdrawal executive

385

Chena Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Chena Geothermal Area Chena Geothermal Area (Redirected from Chena Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Chena Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Future Plans 5 Exploration History 6 Well Field Description 7 Technical Problems and Solutions 8 Geology of the Area 9 Heat Source 10 Geofluid Geochemistry 11 NEPA-Related Analyses (1) 12 Exploration Activities (9) 13 References Map: Chena Geothermal Area Chena Geothermal Area Location Map Area Overview Geothermal Area Profile Location: Fairbanks, Alaska Exploration Region: Alaska Geothermal Region GEA Development Phase: Operational"Operational" is not in the list of possible values (Phase I - Resource Procurement and Identification, Phase II - Resource Exploration and Confirmation, Phase III - Permitting and Initial Development, Phase IV - Resource Production and Power Plant Construction) for this property.

386

History of 100-B Area  

SciTech Connect

The initial three production reactors and their support facilities were designated as the 100-B, 100-D, and 100-F areas. In subsequent years, six additional plutonium-producing reactors were constructed and operated at the Hanford Site. Among them was one dual-purpose reactor (100-N) designed to supply steam for the production of electricity as a by-product. Figure 1 pinpoints the location of each of the nine Hanford Site reactors along the Columbia River. This report documents a brief description of the 105-B reactor, support facilities, and significant events that are considered to be of historical interest. 21 figs.

Wahlen, R.K.

1989-10-01T23:59:59.000Z

387

X-ray absorption fine structure spectroscopic determination of plutonium speciation at the Rocky Flats environmental technology  

SciTech Connect

X-ray Absorption Fine Structure spectroscopy was used to probe the speciation of the ppm level Pu in thirteen soil and concrete samples from the Rocky Flats Environmental Technology Site in support of the site remediation effort that has been successfully completed since these measurements. In addition to X-ray Absorption Near Edge Spectra, two of the samples yielded Extended X-ray Absorption Fine Structure spectra that could be analyzed by curve-fits. Most of these spectra exhibited features consistent with PU(IV), and more specificaJly, PuO{sub 2+x}-type speciation. Two were ambiguous, possibly indicating that Pu that was originally present in a different form was transforming into PuO{sub 2+x}, and one was interpreted as demonstrating the presence of an unusual Pu(VI) compound, consistent with its source being spills from a PUREX purification line onto a concrete floor and the resultant extreme conditions. These experimental results therefore validated models that predicted that insoluble PuO{sub 2+x} would be the most stable form of Pu in equilibrium with air and water even when the source terms were most likely Pu metal with organic compounds or a Pu fire. A corollary of these models' predictions and other in situ observations is therefore that the minimal transport of Pu that occurred on the site was via the resuspension and mobilization of colloidal particles. Under these conditions, the small amounts of diffusely distributed Pu that were left on the site after its remediation pose only a negligible hazard.

Lezama-pacheco, Juan S [Los Alamos National Laboratory; Conradson, Steven D [Los Alamos National Laboratory; Clark, David L [Los Alamos National Laboratory

2008-01-01T23:59:59.000Z

388

Chena Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Chena Geothermal Area Chena Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Chena Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Future Plans 5 Exploration History 6 Well Field Description 7 Technical Problems and Solutions 8 Geology of the Area 9 Heat Source 10 Geofluid Geochemistry 11 NEPA-Related Analyses (1) 12 Exploration Activities (9) 13 References Map: Chena Geothermal Area Chena Geothermal Area Location Map Area Overview Geothermal Area Profile Location: Fairbanks, Alaska Exploration Region: Alaska Geothermal Region GEA Development Phase: Operational"Operational" is not in the list of possible values (Phase I - Resource Procurement and Identification, Phase II - Resource Exploration and Confirmation, Phase III - Permitting and Initial Development, Phase IV - Resource Production and Power Plant Construction) for this property.

389

Pumpernickel Valley Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Pumpernickel Valley Geothermal Area Pumpernickel Valley Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Pumpernickel Valley Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (1) 9 Exploration Activities (0) 10 References Map: Pumpernickel Valley Geothermal Area Pumpernickel Valley Geothermal Area Location Map Area Overview Geothermal Area Profile Location: Nevada Exploration Region: Northwest Basin and Range Geothermal Region GEA Development Phase: none"None" is not in the list of possible values (Phase I - Resource Procurement and Identification, Phase II - Resource Exploration and Confirmation, Phase III - Permitting and Initial Development, Phase IV - Resource Production and Power Plant Construction) for this property.

390

Whiskey Flats Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Whiskey Flats Geothermal Area Whiskey Flats Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Whiskey Flats Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (1) 9 Exploration Activities (0) 10 References Map: Whiskey Flats Geothermal Area Whiskey Flats Geothermal Area Location Map Area Overview Geothermal Area Profile Location: Nevada Exploration Region: Walker-Lane Transition Zone Geothermal Region GEA Development Phase: none"None" is not in the list of possible values (Phase I - Resource Procurement and Identification, Phase II - Resource Exploration and Confirmation, Phase III - Permitting and Initial Development, Phase IV - Resource Production and Power Plant Construction) for this property.

391

A Study of the Stability and Characterization Plutonium Dioxide and Chemical Characterization [of] Rocky Flats and Los Alamos Plutonium-Containing Incinerator Ash  

SciTech Connect

In the presentation ''A Study of the Stability and Characterization of Plutonium Dioxide'', the authors discuss their recent work on actinide stabilities and characterization, in particular, plutonium dioxide PuO{sub 2}. Earlier studies have indicated that PuO{sub 2} has the fluorite structure of CaF{sub 2} and typical oxide semiconductor properties. However, detailed results on the bulk electronic structure of this important actinide oxide have not been available. The authors have used all-electron, full potential linear combinations Gaussian type orbitals fitting function (LCGTO-FF) method to study PuO{sub 2}. The LCGTO-FF technique characterized by its use of three independent GTO basis sets to expand the orbitals, charge density, and exchange-correlation integral kernels. Results will be presented on zero pressure using both the Hedin-Lundquist local density approximation (LDA) model or the Perdew-Wang generalized gradient approximation (GGA) model. Possibilities of different characterizations of PuO{sub 2} will be explored. The paper ''Chemical Characterization Rocky Flats and Los Alamos Plutonium-Containing Incinerator Ash'' describes the results of a comprehensive study of the chemical characteristics of virgin, calcined and fluorinated incinerator ash produced at the Rocky Flats Plant and at the Los Alamos National Laboratory prior to 1988. The Rocky Flats and Los Alamos virgin, calcined, and fluorinated ashes were also dissolved using standard nitrate dissolution chemistry. Corresponding chemical evaluations were preformed on the resultant ash heel and the results compared with those of the virgin ash. Fluorination studies using FT spectroscopy as a diagnostic tool were also performed to evaluate the chemistry of phosphorus, sulfur, carbon, and silicon containing species in the ash. The distribution of plutonium and other chemical elements with the virgin ash, ash heel, fluorinated ash, and fluorinated ash heel particulates were studied in detail using microprobe analysis. Some of the more interesting results of these investigations are presented.

Ray, A.K.; Boettger, J.C.; Behrens, Robert G.

1999-11-29T23:59:59.000Z

392

Regional Operations Research Program for Commercialization of Geothermal Energy in the Rocky Mountain Basin and Range. Final Technical Report, January 1980--March 1981  

DOE Green Energy (OSTI)

This report describes the work accomplished from January 1980 to March 1981 in the Regional Operations Research efforts for the Rocky Mountain Basin and Range Geothermal Commercialization Program. The scope of work is as described in New Mexico State University Proposal 80-20-207. The work included continued data acquisition and extension of the data base, enhancement and refinement of the economic models for electric and direct use applications, site-specific and aggregated analyses in support of the state teams, special analyses in support of several federal agencies, and marketing assistance to the state commercialization teams.

None

1981-07-01T23:59:59.000Z

393

DOE/EIS-0026-SA-03: Supplement Analysis for The Disposal of Certain Rocky Flats Plutonium-Bearing Materials at the Waste Isolation Pilot Plant (11/08/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supplement Analysis For Disposal of Certain Rocky Flats Supplement Analysis For Disposal of Certain Rocky Flats Plutonium-Bearing Materials at the Waste Isolation Pilot Plant PURPOSE The U.S. Department of Energy (DOE) is proposing to revise its approach for managing approximately 0.97 metric tons (MT) of plutonium-bearing materials (containing about 0.18 MT of surplus plutonium) located at the Rocky Flats Environmental Technology Site (RFETS). DOE is proposing to repackage and transport these materials for direct disposal at the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico. Several DOE environmental impact statements (EISs) discuss the potential impacts from different proposed alternatives for the storage and disposition of surplus plutonium and waste containing surplus plutonium. These EISs evaluated and presented the potential impacts for

394

Company Name Company Name Address Place Zip Product Website Region  

Open Energy Info (EERE)

Ventures Massachusetts Ballardvale Street Suite Ventures Massachusetts Ballardvale Street Suite A260 Wilmington Massachusetts Venture capital firm investing in early stage clean technology enterprises http www ventures com Greater Boston Area Access Venture Partners Access Venture Partners Turnpike Drive Suite Westminster Colorado Venture Capital http www accessvp com Rockies Area Advanced Materials Partners Inc Advanced Materials Partners Inc Pine Street New Canaan Connecticut Venture investor http www amplink com Northeast NY NJ CT PA Area Advent International Advent International State Street Boston Massachusetts Global private equity firm http www adventinternational com Greater Boston Area African Development Bank African Development Bank Rue Joseph Anoma BP Abidjan Abidjan C te d Ivoire Ivory Coast http www afdb org en

395

Dixie Meadows Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Dixie Meadows Geothermal Area Dixie Meadows Geothermal Area (Redirected from Dixie Meadows Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Dixie Meadows Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (6) 9 Exploration Activities (2) 10 References Area Overview Geothermal Area Profile Location: Nevada Exploration Region: Central Nevada Seismic Zone GEA Development Phase: None"None" is not in the list of possible values (Phase I - Resource Procurement and Identification, Phase II - Resource Exploration and Confirmation, Phase III - Permitting and Initial Development, Phase IV - Resource Production and Power Plant Construction) for this property.

396

Gabbs Valley Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Gabbs Valley Geothermal Area Gabbs Valley Geothermal Area (Redirected from Gabbs Valley Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Gabbs Valley Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (4) 9 Exploration Activities (11) 10 References Area Overview Geothermal Area Profile Location: Nevada Exploration Region: Central Nevada Seismic Zone GEA Development Phase: None"None" is not in the list of possible values (Phase I - Resource Procurement and Identification, Phase II - Resource Exploration and Confirmation, Phase III - Permitting and Initial Development, Phase IV - Resource Production and Power Plant Construction) for this property.

397

Salt Wells Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Salt Wells Geothermal Area Salt Wells Geothermal Area (Redirected from Salt Wells Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Salt Wells Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Future Plans 5 Exploration History 6 Well Field Description 7 Research and Development Activities 8 Technical Problems and Solutions 9 Geology of the Area 9.1 Regional Setting 9.2 Stratigraphy 9.3 Structure 10 Hydrothermal System 11 Heat Source 12 Geofluid Geochemistry 13 NEPA-Related Analyses (9) 14 Exploration Activities (28) 15 References Area Overview Geothermal Area Profile Location: Nevada Exploration Region: Northwest Basin and Range Geothermal Region GEA Development Phase: Operational"Operational" is not in the list of possible values (Phase I - Resource Procurement and Identification, Phase II - Resource Exploration and Confirmation, Phase III - Permitting and Initial Development, Phase IV - Resource Production and Power Plant Construction) for this property.

398

Amedee Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » Amedee Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Amedee Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (0) 10 References Map: Amedee Geothermal Area Amedee Geothermal Area Location Map Area Overview Geothermal Area Profile Location: California Exploration Region: Walker-Lane Transition Zone GEA Development Phase: Operational"Operational" is not in the list of possible values (Phase I - Resource Procurement and Identification, Phase II - Resource Exploration and Confirmation, Phase III - Permitting and Initial Development, Phase IV - Resource Production and Power Plant Construction) for this property.

399

Strategic Focus Areas  

NLE Websites -- All DOE Office Websites (Extended Search)

Focus Areas Lockheed Martin on behalf of Sandia National Laboratories will consider grant requests that best support the Corporation's strategic focus areas and reflect effective...

400

Integrating Volume Reduction and Packaging Alternatives to Achieve Cost Savings for Low Level Waste Disposal at the Rocky Flats Environmental Technology Site  

Science Conference Proceedings (OSTI)

In order to reduce costs and achieve schedules for Closure of the Rocky Flats Environmental Technology Site (RFETS), the Waste Requirements Group has implemented a number of cost saving initiatives aimed at integrating waste volume reduction with the selection of compliant waste packaging methods for the disposal of RFETS low level radioactive waste (LLW). Waste Guidance Inventory and Shipping Forecasts indicate that over 200,000 m3 of low level waste will be shipped offsite between FY2002 and FY2006. Current projections indicate that the majority of this waste will be shipped offsite in an estimated 40,000 55-gallon drums, 10,000 metal and plywood boxes, and 5000 cargo containers. Currently, the projected cost for packaging, shipment, and disposal adds up to $80 million. With these waste volume and cost projections, the need for more efficient and cost effective packaging and transportation options were apparent in order to reduce costs and achieve future Site packaging a nd transportation needs. This paper presents some of the cost saving initiatives being implemented for waste packaging at the Rocky Flats Environmental Technology Site (the Site). There are many options for either volume reduction or alternative packaging. Each building and/or project may indicate different preferences and/or combinations of options.

Church, A.; Gordon, J.; Montrose, J. K.

2002-02-26T23:59:59.000Z

Note: This page contains sample records for the topic "rockies area product" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Rocky Mountain's Home page  

NLE Websites -- All DOE Office Websites (Extended Search)

most of Wyoming, Nebraska and northeastern Kansas to wholesale customers such as towns, rural electric cooperatives, public utility and irrigation districts, Federal, state, and...

402

About Rocky Mountain Region  

NLE Websites -- All DOE Office Websites (Extended Search)

Kansas. We sell more than 2.3 billion kilowatthours of power, generating from 19 hydroelectric plants. These plants are part of the Fryingpan-Arkansas Project and the Pick-Sloan...

403

Bristol Bay Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Bristol Bay Geothermal Area Bristol Bay Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Bristol Bay Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (1) 9 Exploration Activities (0) 10 References Area Overview Geothermal Area Profile Location: Bristol Bay Borough, Alaska Exploration Region: Alaska Geothermal Region GEA Development Phase: none"None" is not in the list of possible values (Phase I - Resource Procurement and Identification, Phase II - Resource Exploration and Confirmation, Phase III - Permitting and Initial Development, Phase IV - Resource Production and Power Plant Construction) for this property.

404

Dixie Meadows Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Dixie Meadows Geothermal Area Dixie Meadows Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Dixie Meadows Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (6) 9 Exploration Activities (2) 10 References Area Overview Geothermal Area Profile Location: Nevada Exploration Region: Central Nevada Seismic Zone GEA Development Phase: None"None" is not in the list of possible values (Phase I - Resource Procurement and Identification, Phase II - Resource Exploration and Confirmation, Phase III - Permitting and Initial Development, Phase IV - Resource Production and Power Plant Construction) for this property.

405

Salt Wells Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Salt Wells Geothermal Area Salt Wells Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Salt Wells Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Future Plans 5 Exploration History 6 Well Field Description 7 Research and Development Activities 8 Technical Problems and Solutions 9 Geology of the Area 9.1 Regional Setting 9.2 Stratigraphy 9.3 Structure 10 Hydrothermal System 11 Heat Source 12 Geofluid Geochemistry 13 NEPA-Related Analyses (9) 14 Exploration Activities (28) 15 References Area Overview Geothermal Area Profile Location: Nevada Exploration Region: Northwest Basin and Range Geothermal Region GEA Development Phase: Operational"Operational" is not in the list of possible values (Phase I - Resource Procurement and Identification, Phase II - Resource Exploration and Confirmation, Phase III - Permitting and Initial Development, Phase IV - Resource Production and Power Plant Construction) for this property.

406

Jersey Valley Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Jersey Valley Geothermal Area Jersey Valley Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Jersey Valley Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (1) 9 Exploration Activities (0) 10 References Area Overview Geothermal Area Profile Location: near Fallon, NV Exploration Region: Central Nevada Seismic Zone Geothermal Region GEA Development Phase: None"None" is not in the list of possible values (Phase I - Resource Procurement and Identification, Phase II - Resource Exploration and Confirmation, Phase III - Permitting and Initial Development, Phase IV - Resource Production and Power Plant Construction) for this property.

407

Areas Participating in the Reformulated Gasoline Program  

Gasoline and Diesel Fuel Update (EIA)

Reformulated Gasoline Program Reformulated Gasoline Program Contents * Introduction * Mandated RFG Program Areas o Table 1. Mandated RFG Program Areas * RFG Program Opt-In Areas o Table 2. RFG Program Opt-In Areas * RFG Program Opt-Out Procedures and Areas o Table 3. History of EPA Rulemaking on Opt-Out Procedures o Table 4. RFG Program Opt-Out Areas * State Programs o Table 5. State Reformulated Gasoline Programs * Endnotes Spreadsheets Referenced in this Article * Reformulated Gasoline Control Area Populations Related EIA Short-Term Forecast Analysis Products * Demand and Price Outlook for Phase 2 Reformulated Gasoline, 2000 * Environmental Regulations and Changes in Petroleum Refining Operations * Areas Participating in Oxygenated Gasoline Program

408

Augusta Mountains Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Augusta Mountains Geothermal Area Augusta Mountains Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Augusta Mountains Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (3) 9 Exploration Activities (0) 10 References Area Overview Geothermal Area Profile Location: Fallon, NV Exploration Region: Central Nevada Seismic Zone Geothermal Region GEA Development Phase: none"None" is not in the list of possible values (Phase I - Resource Procurement and Identification, Phase II - Resource Exploration and Confirmation, Phase III - Permitting and Initial Development, Phase IV - Resource Production and Power Plant Construction) for this property.

409

Barriers to technology diffusion of Solar Water Heaters (SWHs) in the City of Windhoek : the case of Rocky Crest Residents.  

E-Print Network (OSTI)

??ENGLISH ABSTRACT: Deforestation, increasing pollution levels, diminishing non-renewable energy reserves, the resulting global warming, and climate change are areas of concern to environmentalists and the (more)

Imene, Helena Ndeuza Kalihulu

2011-01-01T23:59:59.000Z

410

Barriers to technology diffusion of solar water heaters in the city of Windhoek : the case of Rocky Crest residents.  

E-Print Network (OSTI)

??Deforestation, increasing pollution levels, diminishing non-renewable energy reserves, the resulting global warming, and climate change are areas of concern to environmentalists and the whole global (more)

Imene, Helena Ndeuza Kalihulu

2011-01-01T23:59:59.000Z

411

Module process optimization and device efficiency improvement for stable, low-cost, large-area, cadmium telluride-based photovoltaic module production. Annual subcontract report, 1 July 1990--31 December 1991  

DOE Green Energy (OSTI)

This report describes work under a three-year phased subcontract to develop CdS/CdTe devices and modules and to further improve the technology base at Photon Energy, Inc. (PEI) to better address the commercialization issues and objectives of the PEI and the US Department of Energy. During this reporting period we (1) achieved efficiencies of 12.7% on small area devices, (2) achieved 1-ft{sup 2} modules with over 8% aperture-area efficiency (and active area efficiencies up to {approximately}10%), (3) tested 4-ft{sup 2} modules at NREL at 23.1 (21.3) watts, normalized (6.3% efficiency), and (4) found no inherent stability problems with CdTe technology during life testing, at both NREL and PEI. 7 refs.

Albright, S.P.; Ackerman, B.; Chamberlin, R.R.; Jordan, J.F. [Photon Energy, Inc., El Paso, TX (United States)

1992-04-01T23:59:59.000Z

412

SUPERGLASS. Engineering field tests - Phase 3. Production, market planning, and product evaluation for a high-thermal-performance insulating glass design utilizing HEAT MIRROR transparent insulation. Final report  

DOE Green Energy (OSTI)

HEAT MIRROR transparent window insulation consists of a clear polyester film two mils (.002'') thick with a thin, clear low-emissivity (.15) coating deposited on one side by state-of-the-art vacuum deposition processes. This neutral-colored invisible coating reflects long-wave infrared energy (heat). When mounted by being stretched with a 1/2'' air-gap on each side of the film, the resulting unit reduces heat loss by 60% compared to dual insulating glass. Southwall Corporation produces HEAT MIRROR transparent insulation and markets it to manufacturers of sealed insulating glass (I.G.) units and window and building manufacturers who make their own I.G. These companies build and sell the SUPERGLASS sealed glazing units. Units made and installed in buildings by six customers were visited. These units were located in many geographic regions, including the Pacific Northwest, Rocky Mountains, New England, Southeast, and West Coast. As much as could be obtained of their history was recorded, as was their current condition and performance. These units had been in place from two weeks to over a year. All of the units were performing thermally very well, as measured by taking temperature profiles through them and through adjacent conventional I.G. units. Some units had minor visual defects (attributed to I.G. assembly techniques) which are discussed in detail. Overall occupant acceptance was enthusiastically positive. In addition to saving energy, without compromise of optical quality or appearance, the product makes rooms with large glazing areas comfortable to be in in cold weather. All defects observed were present when built; there appears to be no in-field degradation of quality at this time.

Tilford, C L

1982-11-01T23:59:59.000Z

413

Division/ Interest Area Information  

Science Conference Proceedings (OSTI)

Learn more about Divisions and Interest areas. Division/ Interest Area Information Membership Information achievement application award Awards distinguished division Divisions fats job Join lipid lipids Member member get a member Membership memori

414

EA-1132: Protected Area Reconfiguration Project, Golden, Colorado  

Energy.gov (U.S. Department of Energy (DOE))

This EA evaluates the environmental impacts of the proposal to consolidate, process, and store Category I and II Special Nuclear Material in Building 371 at the U.S. Department of Energy Rocky...

415

SLAC National Accelerator Laboratory: SLAC Science Focus Area...  

NLE Websites -- All DOE Office Websites (Extended Search)

accelerated closure of costly large-scale DOE legacy site operations such as the Rocky Flats Environmental Technology Site1. The SLAC SFA is working to leverage SR studies to...

416

PADD 5 Refinery and Blender Net Production  

U.S. Energy Information Administration (EIA)

Area: Period-Unit: Download Series History: Definitions, Sources & Notes: Show Data By: Product: Area: Mar ... 51: 1981-2013: Propane: 35: 35: 37: 38: 35: 42: 1995 ...

417

DOE Designates Southwest Area and Mid-Atlantic Area National...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Designates Southwest Area and Mid-Atlantic Area National Interest Electric Transmission Corridors October 2, 2007 DOE Designates Southwest Area and Mid-Atlantic Area National...

418

DOE Designates Southwest Area and Mid-Atlantic Area National...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Designates Southwest Area and Mid-Atlantic Area National Interest Electric Transmission Corridors DOE Designates Southwest Area and Mid-Atlantic Area National Interest Electric...

419

Geothermal br Resource br Area Geothermal br Resource br Area...  

Open Energy Info (EERE)

Brady Hot Springs Geothermal Area Brady Hot Springs Geothermal Area Northwest Basin and Range Geothermal Region MW K Coso Geothermal Area Coso Geothermal Area Walker Lane...

420

U.S. Army Engineer Waterways Experiment Station (WES) support to Department of Energy Rocky Flats Facility (DOE RF) saltcrete processing. Progress report, October 1--December 31, 1994  

SciTech Connect

This report summarizes work authorized for technical and scientific support to waste cementation and saltcrete processing operations. During this report period, tasks described in amendment M003 were initiated, some were completed, and an additional task not listed in M003 also was completed at the request of DOE RF. Summaries of task-specific activities are in four enclosures to this progress report. Other activities during this quarter included negotiation and initiation of amendment M004, to extend the period of performance and continue WES assistance to DOE RF. The four enclosures are: continuing support to waste cementation and saltcrete operations at DOE Rocky Flats Facility; review of ``Analyses of saltcrete``; review of Connell, et al ``Saltcrete evaluation`` report dated August 16, 1993; and scoping study of simulated saltcrete.

NONE

1995-01-27T23:59:59.000Z

Note: This page contains sample records for the topic "rockies area product" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Analysis of natural gases, Rocky Mtn. Region (AZ, CO, MT, NM, UT and WY), 1951-1991 (for microcomputers). Data file  

Science Conference Proceedings (OSTI)

The U.S. Bureau of Mines diskette contains analysis and related source data for 2,545 natural gas samples collected from Rocky Mountain Region, which include the following states: Arizona, Colorado, Montana, New Mexico, Utah, and Wyoming. All samples were obtained and analyzed as part of the Bureau's investigations of the occurrences of helium in natural gases of countries with free market economies. The survey has been conducted since 1917. The analysis contained on the diskette: READ.ME, RCKMTN.TXT, RCKMTN.DBF, USHEANAL.DBF, and BASINCDE.TXT. The READ.ME file contains documentation. The RCKMTN.TXT file contains 2,545 natural gas analysis records in ASCII nondelimited, fixed-length format. The length of each record is 411 characters.

Not Available

1991-01-01T23:59:59.000Z

422

Gabbs Valley Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » Gabbs Valley Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Gabbs Valley Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (4) 9 Exploration Activities (11) 10 References Area Overview Geothermal Area Profile Location: Nevada Exploration Region: Central Nevada Seismic Zone GEA Development Phase: None"None" is not in the list of possible values (Phase I - Resource Procurement and Identification, Phase II - Resource Exploration and Confirmation, Phase III - Permitting and Initial Development, Phase IV - Resource Production and Power Plant Construction) for this property.

423

Microphysical Effects of Wintertime Cloud Seeding with Silver Iodide over the Rocky Mountains. Part I: Experimental Design and Instrumentation  

Science Conference Proceedings (OSTI)

A series of winter orographic cloud seeding experiments is described in which the seeding agent and associated changes in cloud microphysics are monitored to within 300 m of the target areas (Montana and Colorado), and at the surface (Colorado ...

Arlin B. Super; Bruce A. Boe; Edmond W. Holroyd III; James A. Heimbach Jr.

1988-10-01T23:59:59.000Z

424

Northeast - NY NJ CT PA Area | Open Energy Information  

Open Energy Info (EERE)

Northeast - NY NJ CT PA Area Northeast - NY NJ CT PA Area (Redirected from New York Area - NY NJ CT PA) Jump to: navigation, search Contents 1 Clean Energy Clusters in the Northeast - NY NJ CT PA Area 1.1 Products and Services in the Northeast - NY NJ CT PA Area 1.2 Research and Development Institutions in the Northeast - NY NJ CT PA Area 1.3 Networking Organizations in the Northeast - NY NJ CT PA Area 1.4 Investors and Financial Organizations in the Northeast - NY NJ CT PA Area 1.5 Policy Organizations in the Northeast - NY NJ CT PA Area Clean Energy Clusters in the Northeast - NY NJ CT PA Area Products and Services in the Northeast - NY NJ CT PA Area Loading map... {"format":"googlemaps3","type":"ROADMAP","types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"limit":500,"offset":0,"link":"all","sort":[""],"order":[],"headers":"show","mainlabel":"","intro":"","outro":"","searchlabel":"\u2026

425

Licron Crystal ESD-Safe Coating Techspray's ESD-safe products can help maintain work areas within the ANSI/ESDS20.20 standards set by the ESD Association  

E-Print Network (OSTI)

Crystal can be sprayed using standard spray guns or paint systems (test compatibility on seals and other agencies. Resources Techspray products are supported by a global sales, technical and customer services States, call the technical sales department at 800-858-4043, email tsales@techspray.com or visit our web

Washington at Seattle, University of - Department of Physics, Electroweak Interaction Research Group

426

Mauna Loa Southwest Rift Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Well Field Information Development Area: Number of Production Wells: Number of Injection Wells: Number of Replacement Wells: Average Temperature of Geofluid: Sanyal...

427

Material Disposal Areas  

NLE Websites -- All DOE Office Websites (Extended Search)

Material Disposal Areas Material Disposal Areas Material Disposal Areas Material Disposal Areas, also known as MDAs, are sites where material was disposed of below the ground surface in excavated pits, trenches, or shafts. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Material Disposal Areas at LANL The following are descriptions and status updates of each MDA at LANL. To view a current fact sheet on the MDAs, click on LA-UR-13-25837 (pdf). MDA A MDA A is a Hazard Category 2 nuclear facility comprised of a 1.25-acre, fenced, and radiologically controlled area situated on the eastern end of Delta Prime Mesa. Delta Prime Mesa is bounded by Delta Prime Canyon to the north and Los Alamos Canyon to the south.

428

Naval applications study areas  

SciTech Connect

This memorandum discusses study areas and items that will require attention for the naval studies of the utilization of nuclear propulsion in a submarine-based missile system.

Hadley, J. W.

1962-06-20T23:59:59.000Z

429

Boulder Area Transportation  

Science Conference Proceedings (OSTI)

... NIST does not endorse or guarantee the quality or services provided by these businesses. All Denver/Boulder area transportation companies. ...

2011-11-16T23:59:59.000Z

430

NIST Aperture area measurements  

Science Conference Proceedings (OSTI)

... particularly critical, for example, in climate and weather applications on ... of aperture areas used in exo-atmospheric solar irradiance measurements; ...

2011-11-03T23:59:59.000Z

431

Company Name Company Name Address Place Zip Sector Product Website  

Open Energy Info (EERE)

boro biofuel boro biofuel maiden lane New York New York Biofuels Multi boro biofuel boro biofuel maiden lane New York New York Biofuels Multi feed stock http borobiofuel com Northeast NY NJ CT PA Area A2BE Carbon Capture LLC A2BE Carbon Capture LLC Panorama Ave Boulder Colorado Biofuels Developing technology for producing valuable fuel and food from CO2 using algal photosynthesis and bio harvesting http www algaeatwork com Rockies Area AE Biofuels Inc formerly Marwich II Ltd AE Biofuels Inc formerly Marwich II Ltd West Palm Beach Florida Biofuels Marwich II Ltd OTC BB MWII OB merged in December with AE Biofuels Inc formerly American Ethanol Subsequently Marwich II Ltd has changed its name to AE Biofuels OTC AEBF AHL TECH AHL TECH PO Box Cincinnati Ohio Biofuels Manufacturing Research and development Other Efficient Utilization http www AHL TECH com

432

High Quality, Scalable Graphene Production  

Presentation_namefor the U.S. Department of Energy ... No good characterization tool for large area ... Current range of product on the market

433

Northeast - NY NJ CT PA Area | Open Energy Information  

Open Energy Info (EERE)

Northeast - NY NJ CT PA Area Northeast - NY NJ CT PA Area Jump to: navigation, search Contents 1 Clean Energy Clusters in the Northeast - NY NJ CT PA Area 1.1 Products and Services in the Northeast - NY NJ CT PA Area 1.2 Research and Development Institutions in the Northeast - NY NJ CT PA Area 1.3 Networking Organizations in the Northeast - NY NJ CT PA Area 1.4 Investors and Financial Organizations in the Northeast - NY NJ CT PA Area 1.5 Policy Organizations in the Northeast - NY NJ CT PA Area Clean Energy Clusters in the Northeast - NY NJ CT PA Area Products and Services in the Northeast - NY NJ CT PA Area Loading map... {"format":"googlemaps3","type":"ROADMAP","types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"limit":500,"offset":0,"link":"all","sort":[""],"order":[],"headers":"show","mainlabel":"","intro":"","outro":"","searchlabel":"\u2026

434

Fueling area site assessment  

SciTech Connect

This report provides results of a Site Assessment performed at the Fuel Storage Area at Buckley ANG Base in Aurora, Colorado. Buckley ANG Base occupies 3,328 acres of land within the City of Aurora in Arapahoe County, Colorado. The Fuel Storage Area (also known as the Fueling Area) is located on the west side of the Base at the intersection of South Powderhorn Street and East Breckenridge Avenue. The Fueling Area consists of above ground storage tanks in a bermed area, pumps, piping, valves, an unloading stand and a fill stand. Jet fuel from the Fueling Area is used to support aircraft operations at the Base. Jet fuel is stored in two 200,000 gallon above ground storage tanks. Fuel is received in tanker trucks at the unloading stand located south and east of the storage tanks. Fuel required for aircraft fueling and other use is transferred into tanker trucks at the fill stand and transported to various points on the Base. The Fuel Storage Area has been in operation for over 20 years and handles approximately 7 million gallons of jet fuel annually.

1996-08-15T23:59:59.000Z

435

area | OpenEI  

Open Energy Info (EERE)

area area Dataset Summary Description These estimates are derived from a composite of high resolution wind resource datasets modeled for specific countries with low resolution data originating from the National Centers for Environmental Prediction (United States) and the National Center for Atmospheric Research (United States) as processed for use in the IMAGE model. The high resolution datasets were produced by the National Renewable Energy Laboratory (United States), Risø DTU National Laboratory (Denmark), the National Institute for Space Research (Brazil), and the Canadian Wind Energy Association. The data repr Source National Renewable Energy Laboratory Date Released Unknown Date Updated Unknown Keywords area capacity clean energy international National Renewable Energy Laboratory

436

Geographic Area Month  

Gasoline and Diesel Fuel Update (EIA)

Fuels by PAD District and State (Cents per Gallon Excluding Taxes) - Continued Geographic Area Month No. 1 Distillate No. 2 Distillate a No. 4 Fuel b Sales to End Users Sales for...

437

3. Producing Areas  

U.S. Energy Information Administration (EIA)

The OCS area provides surplus capacity to meet major seasonal swings in the lower 48 States gas requirements. The ... Jun-86 9,878 17,706 1,460 19,166 9,288 51.5

438

Decontamination & decommissioning focus area  

Science Conference Proceedings (OSTI)

In January 1994, the US Department of Energy Office of Environmental Management (DOE EM) formally introduced its new approach to managing DOE`s environmental research and technology development activities. The goal of the new approach is to conduct research and development in critical areas of interest to DOE, utilizing the best talent in the Department and in the national science community. To facilitate this solutions-oriented approach, the Office of Science and Technology (EM-50, formerly the Office of Technology Development) formed five Focus AReas to stimulate the required basic research, development, and demonstration efforts to seek new, innovative cleanup methods. In February 1995, EM-50 selected the DOE Morgantown Energy Technology Center (METC) to lead implementation of one of these Focus Areas: the Decontamination and Decommissioning (D & D) Focus Area.

NONE

1996-08-01T23:59:59.000Z

439

APS Area Emergency Supervisors  

NLE Websites -- All DOE Office Websites (Extended Search)

Area Emergency Supervisors BUILDING AES AAES 400-EAA Raul Mascote Debra Eriksen-Bubulka 400-A (SPX) Tim Jonasson 400-Sectors 25-30 Reggie Gilmore 401-CLO Steve Downey Ed Russell...

440

Beowawe Hot Springs Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Beowawe Hot Springs Geothermal Area Beowawe Hot Springs Geothermal Area (Redirected from Beowawe Hot Springs Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Beowawe Hot Springs Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Future Plans 5 Exploration History 6 Well Field Description 7 Research and Development Activities 8 Technical Problems and Solutions 9 Geology of the Area 10 Geofluid Geochemistry 11 NEPA-Related Analyses (0) 12 Exploration Activities (8) 13 References Map: Beowawe Hot Springs Geothermal Area Beowawe Hot Springs Geothermal Area Location Map Area Overview Geothermal Area Profile Location: Beowawe, Nevada Exploration Region: Central Nevada Seismic Zone GEA Development Phase: Operational"Operational" is not in the list of possible values (Phase I - Resource Procurement and Identification, Phase II - Resource Exploration and Confirmation, Phase III - Permitting and Initial Development, Phase IV - Resource Production and Power Plant Construction) for this property.

Note: This page contains sample records for the topic "rockies area product" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Revised Livermore seismic hazard estimates for sixty-nine nuclear power plant sites east of the Rocky Mountains. Final report, July 1993--March 1994  

SciTech Connect

The draft version of this report presented updated Lawrence Livermore National Laboratory (LLNL) probabilistic seismic hazard analysis estimates for 69 nuclear power plant sites in the region of the United States east of the Rocky Mountains. LLNL performed a re-elicitation of seismicity and ground motion experts to improve their estimates of uncertainty in seismicity parameters and ground motion models. Using these revised inputs, LLNL updated the seismic hazard estimates documented in NUREG/CR-5250 (1989). These updated hazard estimates will be used in future NRC actions. The draft was issued for public comment in October 1993. By the end of the public comment period, February 28, 1994, comments had been received from two nuclear industry companies. The comments from these companies neither contested nor suggested amendments to the technical data conveyed in the report. Rather, they both suggest changes in the Individual Plant External Event Examination (IPEEE) program scope. This report is not the forum for discussion of the IPEEE program. Possible modification to the scope of the IPEEE will be examined in its own setting. Therefore, there are no technical differences between the draft report and this final report. Any information as to modifications to the IPEEE program will be provided to the public via an NRC general communication.

Sobel, P.

1994-04-01T23:59:59.000Z

442

A comparison of rates of hornblende etching in soils in glacial deposits of the northern Rocky Mountains: Influence of climate and characteristics of parent material  

Science Conference Proceedings (OSTI)

Etching rates of hornblende grains in the soil matrix of glacial deposits in the Northern Rocky Mountains are dependent primarily upon the influences on soil moisture of the climate and texture of the parent materials. Etching is measured as the deepest penetration of weathering along cleavages. Previous works have shown that hornblende etching is a logarithmic function of depth. Hornblende etching is also a logarithmic function of age of the parent material, with etching rates declining rapidly after initially high rates during the first 10 to 15 kyr after deposition. A comparison of etching rates was made among four chronosequences from the Wind River Range, Wyoming and the Tobacco Root Range, Montana, which have differences in mean annual precipitation (MAP) and texture of the till parent materials. Using rates calculated from both ranges for the first 12 kyr after deposition, etching is slowest (0.02 [mu]m/1,000 yrs) in coarse-textured granitic parent materials where the MAP is 25--40 cm. In contrast, etching is faster by an order of magnitude (0.21 [mu]m/1,000 yrs) where MAP is 110--150 cm and the parent material is finer textured due to about 15% sedimentary rock material mixed with a granitic component. Within individual chronosequences, deposits at higher elevations have accelerated etching rates due to higher orographic precipitation or the influence of late-lying snow. These factors result in higher soil moisture content.

Horn, L.L. (Univ. of Florida, Gainesville, FL (United States). Dept. of Geology); Hall, R.D. (Indiana Univ.--Purdue Univ., Indianapolis, IN (United States). Dept. of Geology)

1993-04-01T23:59:59.000Z

443

Evaluation of habitat use by Rocky Mountain elk (Cervus elaphus nelsoni) in north-central New Mexico using global positioning system radio collars  

SciTech Connect

In 1996 the authors initiated a study to identify habitat use in north-central New Mexico by Rocky Mountain elk (Cervus elaphus nelsoni) using global positioning system (GPS) radio collars. They collared six elk in the spring of 1996 with GPS radio collars programmed to obtain locational fixes every 23 h. Between April 1, 1996 and January 7, 1997, they collected >1,200 fixes with an approximately 70% observation rate. They have interfaced GPS locational fixes of elk and detailed vegetation maps using the geographical information system to provide seasonal habitat use within mountainous regions of north-central New Mexico. Based on habitat use and availability analysis, use of grass/shrub and pinon/juniper habitats was generally higher than expected during most seasons and use of forested habitats was lower than expected. Most of the collared elk remained on LANL property year-round. The authors believe the application of GPS collars to elk studies in north-central New Mexico to be a more efficient and effective method than the use of VHF (very-high frequency) radio collars.

Biggs, J.; Bennett, K.; Fresquez, P.R.

1997-04-01T23:59:59.000Z

444

Operational Area Monitoring Plan  

Office of Legacy Management (LM)

' ' SECTION 11.7B Operational Area Monitoring Plan for the Long -Term H yd rol og ical M o n i to ri ng - Program Off The Nevada Test Site S . C. Black Reynolds Electrical & Engineering, Co. and W. G. Phillips, G. G. Martin, D. J. Chaloud, C. A. Fontana, and 0. G. Easterly Environmental Monitoring Systems Laboratory U. S. Environmental Protection Agency October 23, 1991 FOREWORD This is one of a series of Operational Area Monitoring Plans that comprise the overall Environmental Monitoring Plan for the DOE Field Office, Nevada (DOEINV) nuclear and non- nuclear testing activities associated with the Nevada Test Site (NTS). These Operational Area Monitoring Plans are prepared by various DOE support contractors, NTS user organizations, and federal or state agencies supporting DOE NTS operations. These plans and the parent

445

Glass Production  

E-Print Network (OSTI)

40, pp. 162 - 186. Glass Production, Shortland, UEE 2009AINES Short Citation: Shortland 2009, Glass Production. UEE.Andrew, 2009, Glass Production. In Willeke Wendrich (ed. ),

Shortland, Andrew

2009-01-01T23:59:59.000Z

446

Production Targets  

E-Print Network (OSTI)

Hall (2005), Prices, Production, and Inventories over theProduction Targets ? Guillermo Caruana CEMFI caruana@cem?.esthe theory using monthly production targets of the Big Three

Caruana, Guillermo; Einav, Liran

2005-01-01T23:59:59.000Z

447

Pottery Production  

E-Print Network (OSTI)

Paul T. Nicholson. ) Pottery Production, Nicholson, UEE 2009Short Citation: Nicholson 2009, Pottery Production. UEE.Paul T. , 2009, Pottery Production. In Willeke Wendrich (

Nicholson, Paul T.

2009-01-01T23:59:59.000Z

448

Cordage Production  

E-Print Network (OSTI)

294: fig. 15-3). Cordage Production, Veldmeijer, UEE 2009Short Citation: Veldmeijer, 2009, Cordage Production. UEE.Andr J. , 2009, Cordage Production. In Willeke Wendrich (

Veldmeijer, Andr J.

2009-01-01T23:59:59.000Z

449

Beowawe Hot Springs Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Beowawe Hot Springs Geothermal Area Beowawe Hot Springs Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Beowawe Hot Springs Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Future Plans 5 Exploration History 6 Well Field Description 7 Research and Development Activities 8 Technical Problems and Solutions 9 Geology of the Area 10 Geofluid Geochemistry 11 NEPA-Related Analyses (0) 12 Exploration Activities (8) 13 References Map: Beowawe Hot Springs Geothermal Area Beowawe Hot Springs Geothermal Area Location Map Area Overview Geothermal Area Profile Location: Beowawe, Nevada Exploration Region: Central Nevada Seismic Zone GEA Development Phase: Operational"Operational" is not in the list of possible values (Phase I - Resource Procurement and Identification, Phase II - Resource Exploration and Confirmation, Phase III - Permitting and Initial Development, Phase IV - Resource Production and Power Plant Construction) for this property.

450

McGuiness Hills Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

McGuiness Hills Geothermal Area McGuiness Hills Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: McGuiness Hills Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (1) 9 Exploration Activities (0) 10 References Map: McGuiness Hills Geothermal Area McGuiness Hills Geothermal Area Location Map Area Overview Geothermal Area Profile Location: Nevada Exploration Region: Northern Basin and Range Geothermal Region GEA Development Phase: none"None" is not in the list of possible values (Phase I - Resource Procurement and Identification, Phase II - Resource Exploration and Confirmation, Phase III - Permitting and Initial Development, Phase IV - Resource Production and Power Plant Construction) for this property.

451

Roosevelt Hot Springs Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Roosevelt Hot Springs Geothermal Area Roosevelt Hot Springs Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Roosevelt Hot Springs Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Future Plans 5 Exploration History 6 Well Field Description 7 Research and Development Activities 8 Technical Problems and Solutions 9 Geology of the Area 10 Heat Source 11 Geofluid Geochemistry 12 NEPA-Related Analyses (0) 13 Exploration Activities (9) 14 References Map: Roosevelt Hot Springs Geothermal Area Roosevelt Hot Springs Geothermal Area Location Map Area Overview Geothermal Area Profile Location: Milford, Utah Exploration Region: Northern Basin and Range Geothermal Region GEA Development Phase: Operational"Operational" is not in the list of possible values (Phase I - Resource Procurement and Identification, Phase II - Resource Exploration and Confirmation, Phase III - Permitting and Initial Development, Phase IV - Resource Production and Power Plant Construction) for this property.

452

borrow_area.cdr  

Office of Legacy Management (LM)

information information at Weldon Spring, Missouri. This site is managed by the U.S. Department of Energy Office of Legacy Management. developed by the former WSSRAP Community Relations Department to provide comprehensive descriptions of key activities that took place throughout the cleanup process The Missouri Department of Conservation (MDC) approved a plan on June 9, 1995, allowing the U.S. Department of Energy (DOE) at the Weldon Spring Site Remedial Action Project (WSSRAP) to excavate nearly 2 million cubic yards of clay material from land in the Weldon Spring Conservation Area. Clay soil from a borrow area was used to construct the permanent disposal facility at the Weldon Spring site. Clay soil was chosen to construct the disposal facility because it has low permeability when

453

Focus Area Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

information provided was consolidated from the original five focus areas for the EM information provided was consolidated from the original five focus areas for the EM Corporate QA Board. The status of QAP/QIP approvals etc. was accurate at the time of posting; however, additional approvals may have been achieved since that time. If you have any questions about the information provided, please contact Bob Murray at robert.murray@em.doe.gov Task # Task Description Status 1.1 Develop a brief questionnaire to send out to both commercial and EM contractors to describe their current approach for identifying the applicable QA requirements for subcontractors, tailoring the requirements based upon risk, process for working with procurement to ensure QA requirements are incorporated into subcontracts, and implementing verification of requirement flow-down by their

454

Focus Area 3 Deliverables  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 - Commercial Grade item and Services 3 - Commercial Grade item and Services Dedication Implementation and Nuclear Services Office of Environmental Management And Energy Facility Contractors Group Quality Assurance Improvement Project Plan Project Focus Area Task # and Description Deliverable Project Area 3-Commercial Grade Item and Services Dedication 3.1-Complete a survey of selected EM contractors to identify the process and basis for their CGI dedication program including safety classification of items being dedicated for nuclear applications within their facilities Completed Survey Approvals: Yes/No/NA Project Managers: S. Waisley, D. Tuttel Yes Executive Committee: D. Chung, J. Yanek, N. Barker, D. Amerine No EM QA Corporate Board: No Energy Facility Contractors Group

455

Argonne area restaurants  

NLE Websites -- All DOE Office Websites (Extended Search)

area restaurants area restaurants Amber Cafe 13 N. Cass Ave. Westmont, IL 60559 630-515-8080 www.ambercafe.net Argonne Guest House Building 460 Argonne, IL 60439 630-739-6000 www.anlgh.org Ballydoyle Irish Pub & Restaurant 5157 Main Street Downers Grove, IL 60515 630-969-0600 www.ballydoylepub.com Bd's Mongolian Grill The Promenade Shopping Center Boughton Rd. & I-355 Bolingbrook, IL 60440 630-972-0450 www.gomongo.com Branmor's American Grill 300 Veterans Parkway Bolingbrook, IL 60440 630-226-9926 www.branmors.com Buca di Beppo 90 Yorktown Convenience Center Lombard, IL 60148 630-932-7673 www.bucadibeppo.com California Pizza Kitchen 551 Oakbrook Center Oak Brook, IL 60523 630-571-7800 www.cpk.com Capri Ristorante 5101 Main Street Downers Grove, IL 60516 630-241-0695 www.capriristorante.com Carrabba's Italian Grill

456

EA-1177: Salvage/Demolition of 200 West Area, 200 East Area, and 300 Area  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Salvage/Demolition of 200 West Area, 200 East Area, and 7: Salvage/Demolition of 200 West Area, 200 East Area, and 300 Area Steam Plants, Richland, Washington EA-1177: Salvage/Demolition of 200 West Area, 200 East Area, and 300 Area Steam Plants, Richland, Washington SUMMARY This EA evaluates the environmental impacts for the proposal to salvage and demolish the 200 West Area, 200 East Area, and 300 Area steam plants and their associated steam distribution piping equipment, and ancillary facilities at the U.S. Department of Energy Hanford Site in Richland, Washington. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD October 21, 1996 EA-1177: Finding of No Significant Impact Salvage/Demolition of 200 West Area, 200 East Area, and 300 Area Steam Plants October 21, 1996 EA-1177: Final Environmental Assessment

457

Hydrogen Production  

NLE Websites -- All DOE Office Websites (Extended Search)

Hydrogen Production DELIVERY FUEL CELLS STORAGE PRODUCTION TECHNOLOGY VALIDATION CODES & STANDARDS SYSTEMS INTEGRATION ANALYSES SAFETY EDUCATION RESEARCH & DEVELOPMENT Economy...

458

U.S. Imports of Crude Oil and Petroleum Products (Thousand ...  

U.S. Energy Information Administration (EIA)

Total Crude Oil and Petroleum Products Imports by Area of Entry; Total Crude Oil and Petroleum Products Supply and Disposition;

459

Tanks Focus Area annual report FY2000  

SciTech Connect

The U.S. Department of Energy (DOE) continues to face a major radioactive waste tank remediation effort with tanks containing hazardous and radioactive waste resulting from the production of nuclear materials. With some 90 million gallons of waste in the form of solid, sludge, liquid, and gas stored in 287 tanks across the DOE complex, containing approximately 650 million curies, radioactive waste storage tank remediation is the nation's highest cleanup priority. Differing waste types and unique technical issues require specialized science and technology to achieve tank cleanup in an environmentally acceptable manner. Some of the waste has been stored for over 50 years in tanks that have exceeded their design lives. The challenge is to characterize and maintain these contents in a safe condition and continue to remediate and close each tank to minimize the risks of waste migration and exposure to workers, the public, and the environment. In 1994, the DOE's Office of Environmental Management (EM) created a group of integrated, multiorganizational teams focusing on specific areas of the EM cleanup mission. These teams have evolved into five focus areas managed within EM's Office of Science and Technology (OST): Tanks Focus Area (TFA); Deactivation and Decommissioning Focus Area; Nuclear Materials Focus Area; Subsurface Contaminants Focus Area; and Transuranic and Mixed Waste Focus Area.

None

2000-12-01T23:59:59.000Z

460

McCoy Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

McCoy Geothermal Area McCoy Geothermal Area (Redirected from Mccoy Geothermal Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: McCoy Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (2) 9 Exploration Activities (12) 10 References Area Overview Geothermal Area Profile Location: Nevada Exploration Region: Central Nevada Seismic Zone GEA Development Phase: None"None" is not in the list of possible values (Phase I - Resource Procurement and Identification, Phase II - Resource Exploration and Confirmation, Phase III - Permitting and Initial Development, Phase IV - Resource Production and Power Plant Construction) for this property.

Note: This page contains sample records for the topic "rockies area product" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Large area bulk superconductors  

DOE Patents (OSTI)

A bulk superconductor having a thickness of not less than about 100 microns is carried by a polycrystalline textured substrate having misorientation angles at the surface thereof not greater than about 15.degree.; the bulk superconductor may have a thickness of not less than about 100 microns and a surface area of not less than about 50 cm.sup.2. The textured substrate may have a thickness not less than about 10 microns and misorientation angles at the surface thereof not greater than about 15.degree.. Also disclosed is a process of manufacturing the bulk superconductor and the polycrystalline biaxially textured substrate material.

Miller, Dean J. (Darien, IL); Field, Michael B. (Jersey City, NJ)

2002-01-01T23:59:59.000Z

462

Western Area Power Administration  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

v*Zy- i , . v*Zy- i , . r ,v * -i S # Af [, (e- . - o -A tl }r- 0 v-" l^~4~S J l ^-)^ I^U^ck iM clti ^ Area Power Administration Follow-up to Nov. 25, 2008 Transition Meeting Undeveloped Transmission Right-of-Way Western has very little undeveloped transmission right-of-way. There is a 7-mile right- of-way between Folsom, CA and Roseville, CA where Western acquired a 250' wide right-of-way but is only using half of it. Another line could be built parallel to Western's line to relieve congestion in the Sacramento area. In addition, Western has rights-of- way for many transmission lines that could be rebuilt to increase transmission capacity. For example, Western's Tracy-Livermore 230-kV line is a single circuit line but the existing towers could support a double circuit line. These rights-of-way would have to

463

Geothermal Areas | Open Energy Information  

Open Energy Info (EERE)

Geothermal Areas Geothermal Areas Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Areas Geothermal Areas are specific locations of geothermal potential (e.g., Coso Geothermal Area). The base set of geothermal areas used in this database came from the 253 geothermal areas identified by the USGS in their 2008 Resource Assessment.[1] Additional geothermal areas were added, as needed, based on a literature search and on projects listed in the GTP's 2011 database of funded projects. Add.png Add a new Geothermal Resource Area Map of Areas List of Areas Loading map... {"format":"googlemaps3","type":"ROADMAP","types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"limit":2500,"offset":0,"link":"all","sort":[""],"order":[],"headers":"show","mainlabel":"","intro":"","outro":"","searchlabel":"\u2026

464

Prime Supplier Sales Volumes of Petroleum Products by Grade,...  

U.S. Energy Information Administration (EIA) Indexed Site

Prime Supplier Sales Volumes of Petroleum Products by Grade, PAD District, and State (Thousand Gallons) Geographic Area Products June 1998 July 1998 August 1998 September 1998...

465

Safety analysis, 200 Area, Savannah River Plant: Separations area operations  

Science Conference Proceedings (OSTI)

The nev HB-Line, located on the fifth and sixth levels of Building 221-H, is designed to replace the aging existing HB-Line production facility. The nev HB-Line consists of three separate facilities: the Scrap Recovery Facility, the Neptunium Oxide Facility, and the Plutonium Oxide Facility. There are three separate safety analyses for the nev HB-Line, one for each of the three facilities. These are issued as supplements to the 200-Area Safety Analysis (DPSTSA-200-10). These supplements are numbered as Sup 2A, Scrap Recovery Facility, Sup 2B, Neptunium Oxide Facility, Sup 2C, Plutonium Oxide Facility. The subject of this safety analysis, the, Plutonium Oxide Facility, will convert nitrate solutions of {sup 238}Pu to plutonium oxide (PuO{sub 2}) powder. All these new facilities incorporate improvements in: (1) engineered barriers to contain contamination, (2) barriers to minimize personnel exposure to airborne contamination, (3) shielding and remote operations to decrease radiation exposure, and (4) equipment and ventilation design to provide flexibility and improved process performance.

Perkins, W.C.; Lee, R.; Allen, P.M.; Gouge, A.P.

1991-07-01T23:59:59.000Z

466

Western Area Power Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

Western Area Power Administration Customer Meeting The meeting will begin at 12:30 pm MST We have logged on early for connectivity purposes Please stand-by until the meeting begins Please be sure to call into the conference bridge at: 888-989-6414 Conf. Code 60223 If you have connectivity issues, please contact: 866-900-1011 1 Introduction  Welcome  Introductions  Purpose of Meeting ◦ Status of the SLCA/IP Rate ◦ SLCA/IP Marketing Plan ◦ Credit Worthiness Policy ◦ LTEMP EIS update ◦ Access to Capital  Handout Materials http://www.wapa.gov/crsp/ratescrsp/default.htm 2 SLCA/IP Rate 3 1. Status of Repayment 2. Current SLCA/IP Firm Power Rate (SLIP-F9) 3. Revenue Requirements Comparison Table 4.SLCA/IP Rate 5. Next Steps

467

Factors Impacting Gasoline Prices and Areas for Further Study  

Gasoline and Diesel Fuel Update (EIA)

Factors Impacting Gasoline Prices and Areas for Further Study Factors Impacting Gasoline Prices and Areas for Further Study 8/10/01 Click here to start Table of Contents Factors Impacting Gasoline Prices and Areas for Further Study Different Factors Impact Different Aspects of Gasoline Price Correlation of Price to Inventory Levels Crude Prices Strongly Related to OECD.Crude & Product Inventories Gasoline Prices Also Influenced by Regional Gasoline Product Markets Tight Product Balance Pushes Up Product Spread (Spot Product - Crude Price) Retail Price Changes Lag Spot Prices Cumulative Gasoline Price Pass-through Illustration of How Lag Effect Dampens and Slows Retail Price Changes from Wholesale Recent Weekly Retail Price Changes Have Been as Expected Summary: Most Gasoline Price Movement Can Be Explained As Rational Market Behavior Author: Joanne Shore