Energy Efficiency Upgrades for Little Rock Air Force Base  

SciTech Connect (OSTI)

Little Rock Air Force Base (LRAFB), in partnership with the local utility, Entergy Services, Inc., has reduced energy costs and used savings from investments in high-efficiency equipment to maintain and improve the condition of base housing and other facilities. Three projects were completed, with over $10 million invested. Major accomplishments include replacing air-to-air heat pumps with high-efficiency ground-source heat pumps (GSHPs) in more than 1,500 base housing units, lighting modifications to 10 buildings, upgrade of HVAC equipment in the base's enlisted club, and energy-efficient lighting retrofits for LRAFB's flight simulator.

Goldman, C.; Dunlap, M.A.

2000-11-13T23:59:59.000Z

2

Final Environmental Assessment of Ground Water Compliance at the Slick Rock, Colorado, UMTRA Project Site  

Broader source: Energy.gov (indexed) [DOE]

58 58 Environmental Assessment of Ground Water Compliance at the Slick Rock, Colorado, UMTRA Project Sites Final February 2003 Prepared by U.S. Department of Energy Grand Junction Office Grand Junction, Colorado Work Performed Under DOE Contract No. DE-AC13-02GJ79491 DOE Grand Junction Office EA of Ground Water Compliance at the Slick Rock Sites February 2003 Final Page iii Contents Page Acronyms and Abbreviations...........................................................................................................v Executive Summary...................................................................................................................... vii 1.0 Introduction.............................................................................................................................1

3

Final Environmental Assessment of Ground Water Compliance at the Slick Rock, Colorado, UMTRA Project Site  

Broader source: Energy.gov (indexed) [DOE]

Impact Impact Ground Water Compliance at the Slick Rock, Colorado, UMTRA Project Sites AGENCY: U.S. DEP.4RTMENT OF ENERGY ACTIOK: FL&-DING OF NO SIGNIFICANT IMP-ACT (FONSI) SU$IM$RY: The U.S. Department of Energy (DOE) plans to implement ground lvater compliance strategies for two Uranium Mill Tailings Remedial Action (UMTR.4) Project sites near Slick Rock. Colorado. The purpose of the strategies is to comply with U.S. En\.ironmental Protection .Qency (EP.Aj ground n'ater standards defined in Title 40 Codr ~fF~d~w/ iieplutio?r.s (CFR) Part 192. and in so doing. protect human health and the en\.ironment. Ground water at the Slick Rock sites is contaminated with residual radioactive materials from hisTorica acti\,ities, associated with the processin of uranium ore, The planned action (~formeri>,.

4

Case studies in magnetics and ground penetrating radar, Shreveport Convention Center, Shreveport, LA and Yankee Boy Rock Glacier, Ouray, CO  

E-Print Network [OSTI]

CASE STUDIES IN MAGNETICS AND GROUND PENETRATING RADAR, SHREVEPORT CONVENTION CENTER, SHREVEPORT, LA AND YANKEE BOY ROCK GLACIER, OURAY, CO A Thesis by CARL J. PIERCE, JR Submitted to the Office of Graduate Studies of Texas A&M University... in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE December 2002 Major Subject: Geophysics CASE STUDIES IN MAGNETICS AND GROUND PENETRATING RADAR, SHREVEPORT CONVENTION CENTER, SHREVEPORT, LA AND YANKEE BOY ROCK GLACIER...

Pierce, Carl J

2012-06-07T23:59:59.000Z

5

Irrigation Hardware Upgrades  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

because the water discharge point is closer to the ground reducing wind drift of the water. Efficiency upgrades are also available for wheel line hubs and levelers. Please...

6

Microsoft Word - CX-AlveyMaintenanceHQ_PoleStorageUpgrade_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

4 4 SUBJECT: Environmental Clearance Memorandum Brett Sherer Project Manager - KEP-4 Proposed Action: Environmental protection system upgrades at pole storage facility at Alvey Maintenance Headquarters. Budget Information: Work Order #00283226 Categorical Exclusion Applied (Appendix B to Subpart D, 10 C.F.R. Part 1021): B4.6: Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area including, but not limited to, switchyard rock grounding upgrades, secondary containment projects, paving projects, seismic upgrading, tower modifications, changing insulators, and replacement of poles, circuit breakers, conductors, transformers, and crossarms.

7

Microsoft Word - CX-HatwaiSubstationUpgradesFY11_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

18, 2011 18, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Brett Sherer Project Manager - KEP-4 Proposed Action: Upgrade of secondary containment facilities at Hatwai Substation Budget Information: Work Order: 00004952 Categorical Exclusion Applied (Appendix B to Subpart D, 10 C.F.R. Part 1021): B4.6: Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area including, but not limited to: switchyard rock grounding upgrades, secondary containment projects, paving projects, seismic upgrading, tower modifications, changing insulators, and replacement of poles, circuit breakers, conductors, transformers, and crossarms.

8

Quasi-three dimensional ground-water modeling of the hydrologic influence of paleozoic rocks on the ground-water table at Yucca Mountain, Nevada  

E-Print Network [OSTI]

The proposed high-level radioactive waste repository site at Yucca Mountain, Nevada, has created a need to understand the, ground-water system at the site. One of the important hydrologic characteristics is a steep gradient on the ground-water table...

Lee, Si-Yong

2012-06-07T23:59:59.000Z

9

A validation of ground penetrating radar for reconstructing the internal structure of a rock glacier: Mount Mestas, Colorado, USA  

E-Print Network [OSTI]

Rock glaciers are dynamic landforms and, as such, exhibit interesting and welldeveloped structural features, which translate to surface morphology in the form of ridges and furrows. These distinguishing features have led researchers to study...

Jorgensen, William Revis

2009-05-15T23:59:59.000Z

10

Microsoft Word - CX-DixieSubstationUpgradesFY11_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

KEP-4 KEP-4 SUBJECT: Environmental Clearance Memorandum Brett Sherer Project Manager - KEP-4 Proposed Action: Upgrade of secondary containment facilities at Dixie Substation Budget Information: Work Order: 00004952 Categorical Exclusion Applied (Appendix B to Subpart D, 10 C.F.R. Part 1021): B4.6: Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area including, but not limited to, switchyard rock grounding upgrades, secondary containment projects, paving projects, seismic upgrading, tower modifications, changing insulators, and replacement of poles, circuit breakers, conductors, transformers, and crossarms. Location: PLS T1S R8E S1 Dixie Substation in Elmore County, Idaho.

11

Quasi-three dimensional ground-water modeling of the hydrologic influence of paleozoic rocks on the ground-water table at Yucca Mountain, Nevada.  

E-Print Network [OSTI]

??The proposed high-level radioactive waste repository site at Yucca Mountain, Nevada, has created a need to understand the, ground-water system at the site. One of… (more)

Lee, Si-Yong

2012-01-01T23:59:59.000Z

12

Capturing Energy Upgrades  

Broader source: Energy.gov [DOE]

Provides an overview of how to capture the value of energy efficiency upgrades in the real estate market, from CNT Energy.

13

Biofuels : Upgraded New Solids  

Science Journals Connector (OSTI)

The main historical keywords for the three pathways are: Agglomeration: Briquettes are long-established upgraded solid fuels, especially based on coal. 1970s: first small scale pellet heating units build in t...

Dr. Marco Klemm; Ralf Schmersahl…

2012-01-01T23:59:59.000Z

14

Biofuels : Upgraded New Solids  

Science Journals Connector (OSTI)

The main historical keywords for the three pathways are: Agglomeration: Briquettes are long-established upgraded solid fuels, especially based on coal. 1970s: first small scale pellet heating units build in t...

Dr. Marco Klemm; Ralf Schmersahl; Dr. Claudia Kirsten…

2013-01-01T23:59:59.000Z

15

Cyclotron Institute Upgrade Project  

SciTech Connect (OSTI)

The Cyclotron Institute at Texas A&M University has upgraded its accelerator facilities to extend research capabilities with both stable and radioactive beams. The upgrade is divided into three major tasks: (1) re-commission the K-150 (88”) cyclotron, couple it to existing beam lines to provide intense stable beams into the K-500 experimental areas and use it as a driver to produce radioactive beams; (2) develop light ion and heavy ion guides for stopping radioactive ions created with the K-150 beams; and (3) transport 1+ ions from the ion guides into a charge-breeding electron-cyclotron-resonance ion source (CB-ECR) to produce highly-charged radioactive ions for acceleration in the K-500 cyclotron. When completed, the upgraded facility will provide high-quality re-accelerated secondary beams in a unique energy range in the world.

Clark, Henry [Texas A& M University; Yennello, Sherry [Texas A& M University; Tribble, Robert [Texas A& M University

2014-08-26T23:59:59.000Z

16

Upgrading Below Grade Spaces  

Broader source: Energy.gov (indexed) [DOE]

Patrick H. Huelman, Sam Breidenbach, Steve Schirber Patrick H. Huelman, Sam Breidenbach, Steve Schirber NorthernSTAR Building America Partnership Upgrading Below Grade Spaces Residential Energy Efficiency Stakeholder March 1, 2012 Austin, TX * Act 1: Technical Challenges & Opportunities - Pat Huelman, University of Minnesota * Act 2: Assessing Homeowner Priorities & Risks - Sam Breidenbach, TDS Custom Construction * Act 3: An Industry Perspective - Steve Schirber, Cocoon Act 1. Upgrade Below Grade * Basement Remodeling: It Doesn't Get Any Riskier! - Combustion safety - Foundation moisture - Radon (& other soil gases) - Biologicals (mold, dust mites, etc.) - Garage gases (if attached) * And front and center are uncontrolled... - negative pressures in basements (beyond stack)

17

15 - Biogas upgrading to biomethane  

Science Journals Connector (OSTI)

Abstract: Compared with other utilization paths of biogas, upgrading of biogas to biomethane offers several advantages and has thus become of increased relevance in the last decade. This chapter describes past developments as well as the current state of upgrading, especially in Europe. Specifics of biogas cleaning combined with biogas upgrading will be described. The chapter focuses on technical aspects of upgrading and off-gas treatment methods as well as on economic aspects of biomethane provision.

Michael Beil; Wiebke Beyrich

2013-01-01T23:59:59.000Z

18

Biochemical upgrading of oils  

DOE Patents [OSTI]

A process for biochemical conversion of heavy crude oils is provided. The process includes contacting heavy crude oils with adapted biocatalysts. The resulting upgraded oil shows, a relative increase in saturated hydrocarbons, emulsions and oxygenates and a decrease in compounds containing organic sulfur, organic nitrogen and trace metals. Adapted microorganisms which have been modified under challenged growth processes are also disclosed. 121 figs.

Premuzic, E.T.; Lin, M.S.

1999-01-12T23:59:59.000Z

19

Changes in measured lightning return stroke peak current after the 1994 National Lightning Detection Network upgrade  

E-Print Network [OSTI]

Since a comprehensive upgrade of the US National Lightning Detection Network (NLDN) in 1994, the mean peak current of detected cloud-to-ground (CG) lightning flashes has decreased, the number of detected flashes has increased, and the percentage...

Wacker, Robert Scott

2012-06-07T23:59:59.000Z

20

White Rock  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Furnished house for rent in rural White Rock Bright and sunny Ideal for a young family Safe neighborhood 10 min drive to LANL 1300 per month, basic utilities included 1180 sq ft....

Note: This page contains sample records for the topic "rock grounding upgrades" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Rock magnetism  

Science Journals Connector (OSTI)

The past three decades have witnessed a new paradigm, the plate tectonics paradigm, in Earth sciences. The record of the Earth's magnetic field stored in rocks played a major role in the establishment of this par...

Ronald T. Merrill

1989-01-01T23:59:59.000Z

22

Global Scratch Upgrade in Progress  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Global Scratch Gets Global Scratch Gets an Upgrade Global Scratch Gets an Upgrade Improvements Will Include Higher Data Output Rates, Connection to PDSF October 29, 2013 The most used file system at the National Energy Research Scientific Computing Center (NERSC)-global scratch-just got an upgrade. As a result, some users may see their data output to global scratch reach up to 80 gigabytes per second. Although users will probably not see their 20-terabyte storage quotas increase, the upgrade ensures that global scratch remains flexible and paves the way for PDSF to eventually use the file system Because of the upgrade, users will also be able to better access their temporary data files or "scratch data" from any NERSC system, not just the one that generated it. Prior to the upgrade, Global scratch typically

23

Global Scratch Upgrade in Progress  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the facility is now positioned to meet the performance demands of all its clusters. By upgrading the consolidated Global Scratch, users will be able to continue taking advantage...

24

Upgraded Coal Interest Group  

SciTech Connect (OSTI)

The Upgraded Coal Interest Group (UCIG) is an EPRI 'users group' that focuses on clean, low-cost options for coal-based power generation. The UCIG covers topics that involve (1) pre-combustion processes, (2) co-firing systems and fuels, and (3) reburn using coal-derived or biomass-derived fuels. The UCIG mission is to preserve and expand the economic use of coal for energy. By reducing the fuel costs and environmental impacts of coal-fired power generation, existing units become more cost effective and thus new units utilizing advanced combustion technologies are more likely to be coal-fired.

Evan Hughes

2009-01-08T23:59:59.000Z

25

Pacific Direct Current Intertie (PDCI) Upgrade Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Accommodate increased power transmission - The upgrade will allow even more clean power, including hydro, wind and solar, to reach markets that need it. Upgrading and...

26

Upgrading the Vanadium Redox Battery | EMSL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Upgrading the Vanadium Redox Battery Upgrading the Vanadium Redox Battery New electrolyte mix increases energy storage by 70 percent After developing a more effective...

27

Upgrade of the MAGIC telescopes  

E-Print Network [OSTI]

The MAGIC telescopes are two Imaging Atmospheric Cherenkov Telescopes (IACTs) located on the Canary island of La Palma. With 17m diameter mirror dishes and ultra-fast electronics, they provide an energy threshold as low as 50 GeV for observations at low zenith angles. The first MAGIC telescope was taken in operation in 2004 whereas the second one joined in 2009. In 2011 we started a major upgrade program to improve and to unify the stereoscopic system of the two similar but at that time different telescopes. Here we report on the upgrade of the readout electronics and digital trigger of the two telescopes, the upgrade of the camera of the MAGIC I telescope as well as the commissioning of the system after this major upgrade.

Mazin, Daniel; Garczarczyk, Markus; Giavitto, Gianluca; Sitarek, Julian

2014-01-01T23:59:59.000Z

28

User and Performance Impacts from Franklin Upgrades  

SciTech Connect (OSTI)

The NERSC flagship computer Cray XT4 system"Franklin" has gone through three major upgrades: quad core upgrade, CLE 2.1 upgrade, and IO upgrade, during the past year. In this paper, we will discuss the various aspects of the user impacts such as user access, user environment, and user issues etc from these upgrades. The performance impacts on the kernel benchmarks and selected application benchmarks will also be presented.

He, Yun (Helen)

2009-05-10T23:59:59.000Z

29

Substation grounding.  

E-Print Network [OSTI]

??Designing a proper substation grounding system is quite complicating. Many parameters affect its design. In order for a grounding design to be safe, it needs… (more)

Baleva, Inna

2012-01-01T23:59:59.000Z

30

LOWELL ADDS ENERGY EFFICIENCY TO HISTORIC UPGRADES | Department...  

Energy Savers [EERE]

LOWELL ADDS ENERGY EFFICIENCY TO HISTORIC UPGRADES LOWELL ADDS ENERGY EFFICIENCY TO HISTORIC UPGRADES LOWELL ADDS ENERGY EFFICIENCY TO HISTORIC UPGRADES Faced with the challenge of...

31

upgrade | OpenEI Community  

Open Energy Info (EERE)

4 4 Varnish cache server Home Groups Community Central Green Button Applications Developer Utility Rate FRED: FRee Energy Database More Public Groups Private Groups Features Groups Blog posts Content Stream Documents Discussions Polls Q & A Events Notices My stuff Energy blogs 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142235354 Varnish cache server upgrade Home Rmckeel's picture Submitted by Rmckeel(297) Contributor 22 October, 2012 - 07:23 Semantic Mediawiki Semantic Forms update developer Incentives and Policies Semantic Mediawiki upgrade Utility Rates We have just updated Semantic Forms on OpenEI to version 2.4 to enable some upgrades to the utility rate forms (thanks Teresa!). If you see any problems in forms you use on OpenEI, please notify us by commenting on this

32

Ground Magnetics (Nannini, 1986) | Open Energy Information  

Open Energy Info (EERE)

Ground Magnetics (Nannini, 1986) Ground Magnetics (Nannini, 1986) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Magnetics (Nannini, 1986) Exploration Activity Details Location Unspecified Exploration Technique Ground Magnetics Activity Date Usefulness not indicated DOE-funding Unknown Notes Detection and quantitative assessment of such intrusive events can be facilitated by magnetic surveys (ground or aerial magnetic field measurements). These surveys are based on the magnetic susceptibility contrast between magmatic rocks at depth and the sedimentary formations above. References Raffaello Nannini (1986) Some Aspects Of Exploration In Non-Volcanic Areas Retrieved from "http://en.openei.org/w/index.php?title=Ground_Magnetics_(Nannini,_1986)&oldid=388291

33

CATEGORICAL EXCLUSION FOR 331 BUILDING IRRIGATION UPGRADES,  

Broader source: Energy.gov (indexed) [DOE]

EXCLUSION FOR 331 BUILDING IRRIGATION UPGRADES, EXCLUSION FOR 331 BUILDING IRRIGATION UPGRADES, 300 AREA, HANFORD SITE, RICHLAND, WASHINGTON Proposed Action: The U.S. Department of Energy (DOE), Pacific Northwest Site Office (PNSO) proposes to upgrade a landscaping irrigation system in the 300 Area. Location of Action: In the landscaped area around the 331 Building, Hanford Site Description of the Proposed Action: The proposed action is to upgrade the existing 331 Building landscaping irrigation system by using nearby aquaculture effluent instead of

34

LHC challenges and upgrade options  

Science Journals Connector (OSTI)

The presentation summarizes the key parameters of the LHC collider. Following a discussion of the main challenges for reaching the nominal machine performance the presentation identifies options for increasing the operation tolerances and the potential performance reach of the LHC by means of future hardware upgrades of the LHC and its injector complex.

O Bruning

2008-01-01T23:59:59.000Z

35

ATLAS Upgrade for sLHC Motivation  

E-Print Network [OSTI]

ATLAS Upgrade for sLHC · Motivation · LHC Upgrades · ATLAS Upgrade/schedule · R&D Variety · Russian Institutes involvement · Conclusions A.Cheplakov JINR, Dubna (on behalf of the ATLAS Collaboration) Many thanks to ATLAS colleagues for the useful information - N.Hessey, A.Loginov, A.Romaniouk, P

36

ATLAS Upgrade Week 1 November 11, 2009  

E-Print Network [OSTI]

ATLAS Upgrade Week 1 November 11, 2009 Proposal to Develop On-Detector Array-based Optical Link A. Maettig Universität Wuppertal K.K. Gan A. Pellegrino, T. Sluijk NIKHEF (LHCb) #12;ATLAS Upgrade Week 2;ATLAS Upgrade Week 3 Introduction VCSEL and PIN are available in three forms: single channel or 4

Gan, K. K.

37

Substation voltage upgrading  

SciTech Connect (OSTI)

This report addresses specific issues to support sound yet not unduly conservative uprating practices for substations. The main parts of the report cover the insulation withstand and overvoltage protection aspects, environmental measurements, reliability criteria, and industry experience. First the insulation design concerns are addressed. Substation stress by a backflashover of the line insulation due to lightning in the vicinity of the substation is recognized as a critical stress. A representative part of a 550 kV BIL substation was erected at the EPRI High Voltage Transmission Research Center, where also a special test circuit was assembled to produce a fast front, slow tail (0.2/200 {mu}s) wave. The substation as well as some special configurations were tested for line-to-ground and line-to-line withstand. Computer studies were performed to complement the test results. A number of important conclusions was reached. The most prominent result in that the high frequency oscillations, as caused by reflections within the substation, do not effect the Critical Flashover Voltage (CFO). The present practice, based on the highest peak is therefore very conservative. The slow tail of the wave appears to dictate the CFO. An arrester model for computer studies to represent very fast as well as slow phenomena was derived. It is based on full scale arrester test data, made available in this project. The computer program to calculate arrester model parameters is also a part of the report. The electric environmental measurements are reported for the tested substation at the HVTRC and for the uprated substation of Public Service Company of Colorado, both before and after the uprating. The performance is satisfactory when corona free hardware is used. Insulation design criteria are analyzed based on substation reliability, the system viewpoint and consequences of the failure. Utility experience with uprated substations is reviewed.

Panek, J.; Elahi, H.; Lux, A.; Imece, A.F. (General Electric Co., Schenectady, NY (United States). Power Systems Engineering Dept.); LaPanse, R.A.; Stewart, J.R. (Public Service Co. of Colorado, Denver, CO (United States))

1992-04-01T23:59:59.000Z

38

Ground Water Ground Sky Sky Water Vegetation Ground Vegetation Water  

E-Print Network [OSTI]

Bear Snow Vegetation RhinoWater Vegetation Ground Water Ground Sky Sky Rhino Water Vegetation Ground Vegetation Water Rhino Water Vegetation Ground Rhino Water Rhino Water Ground Ground Vegetation Water Rhino Vegetation Rhino Vegetation Ground Rhino Vegetation Ground Sky Rhino Vegetation Ground Sky

Chen, Tsuhan

39

Ground Magnetics | Open Energy Information  

Open Energy Info (EERE)

Ground Magnetics Ground Magnetics Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Technique: Ground Magnetics Details Activities (15) Areas (12) Regions (0) NEPA(1) Exploration Technique Information Exploration Group: Geophysical Techniques Exploration Sub Group: Magnetic Techniques Parent Exploration Technique: Magnetic Techniques Information Provided by Technique Lithology: Presence of magnetic minerals such as magnetite. Stratigraphic/Structural: Mapping of basement structures, horst blocks, fault systems, fracture zones, dykes and intrusions. Hydrological: The circulation of hydrothermal fluid may impact the magnetic susceptibility of rocks. Thermal: Rocks lose their magnetic properties at the Curie temperature (580° C for magnetite) [1] and, upon cooling, remagnetize in the present magnetic field orientation. The Curie point depth in the subsurface may be determined in a magnetic survey to provide information about hydrothermal activity in a region.

40

About: Why Energy Efficiency Upgrades  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Why Energy Efficiency Upgrades Why Energy Efficiency Upgrades Two photos side by side showing energy loss through the use of infrared technology. As part of a home energy evaluation, an energy professional can use an infrared camera to pinpoint where air leaks and drafts are occurring in your home or building. Although normally difficult to see, these infrared photos clearly show in color where energy losses are occurring in a typical house. How We Use Energy in Our Buildings How We Use Energy in Our Homes (% of Energy Consumption) A pie chart illustrating the following breakdown: Space heating 43%, space cooling 9.7%, water heating 17.1%, lighting 6.2%, refrigeration 3.9%, electronics 3%, wet cleaning 3.2%, cooking 3.1%, computers 1.6%. Source: 2010 Buildings Energy Data Book, Table 2.1.6

Note: This page contains sample records for the topic "rock grounding upgrades" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Rock magnetism of remagnetized carbonate rocks: another look  

E-Print Network [OSTI]

and significance of magnetism in sedimentary rocks. Journal1997. Rock Magnetism. ¨ zdemir, O Dunlop, D. J. & Oon July 30, 2013 ROCK MAGNETISM: REMAGNETIZED CARBONATES

Jackson, M.; Swanson-Hysell, N. L

2012-01-01T23:59:59.000Z

42

D0 Silicon Upgrade: Upgrade on Cryogenic Lines at Refrigerator  

SciTech Connect (OSTI)

This is an upgrade to the thermal contraction analysis sound in D0 Engineering Note: 3823.115-EN-426. In this new design, a portion of the transfer lines are consolidated into one 6-inch vacuum jacket. Since all four transfer lines follow the same path and are of equal lengths, the stress analysis is performed on only one transfer line using the design system ALGOR{reg_sign}. The GHe Cooldown Supply line is analyzed for combined pressure, thermal movement, and dead weight and all the stresses were below the allowable stress limit of 25,050 psi.

Kuwazaki, Andrew; /Fermilab

1995-09-26T23:59:59.000Z

43

Energy Upgrade California | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Upgrade California Upgrade California Energy Upgrade California < Back Eligibility Multi-Family Residential Residential Savings Category Home Weatherization Commercial Weatherization Heating & Cooling Commercial Heating & Cooling Cooling Other Sealing Your Home Ventilation Manufacturing Heating Windows, Doors, & Skylights Program Info Funding Source The American Reinvestment and Recovery Act of 2009, ratepayer funds State California Program Type State Rebate Program Rebate Amount Basic Upgrade Package: 1,000 Advance Upgrade Package: 1,500 - 4,000 The Energy Upgrade California program serves as a one-stop shop for California homeowners who want to improve the energy efficiency of their homes. The program connects homeowners with qualified contractors, and helps homeowners find all the available incentives from their local

44

California Member Connects Solar Adoption With Upgrades  

Broader source: Energy.gov [DOE]

Studies on the connection between solar adoption and energy upgrades by Better Buildings Residential Network member Center for Sustainable Energy (CSE) in California are helping solar companies...

45

BIOREFINING COMPOUNDS AND ORGANOCATALYTIC UPGRADING METHODS ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

invention provides new methods for the direct umpolung self-condensation of 5-hydroxymethylfurfural (HMF) by organocatalysis, thereby upgrading the readily available substrate...

46

Upgrade Boilers with Energy-Efficient Burners  

SciTech Connect (OSTI)

This revised ITP steam tip sheet on upgrading boilers provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

Not Available

2006-01-01T23:59:59.000Z

47

Metal Organic Framework Adsorbent for Biogas Upgrading  

Science Journals Connector (OSTI)

In this context, this adsorbent can be used for biogas upgrading to produce biomethane and reduce fossil-fuel CO2. ...

Simone Cavenati; Carlos A. Grande; Alírio E. Rodrigues; Christoph Kiener; Ulrich Müller

2008-07-25T23:59:59.000Z

48

Ground Gravity Survey | Open Energy Information  

Open Energy Info (EERE)

Ground Gravity Survey Ground Gravity Survey Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Technique: Ground Gravity Survey Details Activities (48) Areas (34) Regions (2) NEPA(2) Exploration Technique Information Exploration Group: Geophysical Techniques Exploration Sub Group: Gravity Techniques Parent Exploration Technique: Gravity Techniques Information Provided by Technique Lithology: Distribution of density in the subsurface enables inference of rock type. Stratigraphic/Structural: Delineation of steeply dipping formations, geological discontinuities and faults, intrusions and large-scale deposition of silicates due to hydrothermal activity. Hydrological: Density of sedimentary rocks are strongly influenced by fluid contained within pore space. Dry bulk density refers to the rock with no moisture, while the wet bulk density accounts for water saturation; fluid content may alter density by up to 30%.(Sharma, 1997)

49

Work Authorization Document NSTX Upgrade Project  

E-Print Network [OSTI]

Work Authorization Document NSTX Upgrade Project Control Account #: 1302 Title: WBS 1.1.11 Title Functional Manager P. Heitzenroeder Approvals Signature Date NSTX-U Project Manager R. Strykowsky 4- WBS and includes design modifications and upgrade of the coil assembly stand; procedures for assembling the Center

Princeton Plasma Physics Laboratory

50

ATLAS Upgrade Week 1 November 10, 2010  

E-Print Network [OSTI]

VCSEL/PIN Irradiation Study radiation hardness of VCSEL/PIN arrays since 2006: vendors: AOC arrays (2010): see next slides AOC 10 Gb/s VCSEL (2010): see next slides #12;K.K. Gan ATLAS Upgrade/cm2: 76% consistent with NIEL hypothesis #12;K.K. Gan ATLAS Upgrade Week 9 Irradiation of AOC

Gan, K. K.

51

NSTXpool Computer Upgrade December 9, 2010  

E-Print Network [OSTI]

NSTXpool Computer Upgrade WP #1685 Bill Davis December 9, 2010 #12;Work Scope Upgrade Operating System, Application Software, and Programs that run on NSTX computers using Red Hat Enterprise Linux 3. nstxpool computers + nstxops nstxWindowsPC (Control Room Display Wall) Big Blue cluster for EFIT Selected

Princeton Plasma Physics Laboratory

52

The Bottom Line Space@Penn Upgrade  

E-Print Network [OSTI]

The Bottom Line Space@Penn Upgrade Coming Soon! A project is underway to upgrade the current that allows designated users in the field to update certain elements of their space. This project, whose: Grants & Projects ­ Used for invoice generation, overhead and revenue recognition, and award and project

Sharp, Kim

53

LHC set to halt for upgrades  

Science Journals Connector (OSTI)

... particle collider is ready to take a well-earned rest. The Large Hadron Collider (LHC) will shut down on 11 February ahead of around two years of upgrade work. ... there will be no long holiday for the thousands of physicists who depend on the LHC for their data. A bruising schedule of maintenance, upgrades and forward planning will keep ...

Geoff Brumfiel

2013-02-06T23:59:59.000Z

54

Ground Electromagnetic Techniques | Open Energy Information  

Open Energy Info (EERE)

Ground Electromagnetic Techniques Ground Electromagnetic Techniques (Redirected from Ground Electromagnetic Methods) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Technique: Ground Electromagnetic Techniques Details Activities (0) Areas (0) Regions (0) NEPA(0) Exploration Technique Information Exploration Group: Geophysical Techniques Exploration Sub Group: Electrical Techniques Parent Exploration Technique: Electromagnetic Techniques Information Provided by Technique Lithology: Rock composition, mineral and clay content Stratigraphic/Structural: Detection of permeable pathways, fracture zones, faults Hydrological: Resistivity influenced by porosity, grain size distribution, permeability, fluid saturation, fluid type and phase state of the pore water Thermal: Resistivity influenced by temperature

55

MMCR Upgrades: Present Status and Future Plans  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

MMCR Upgrades: Present Status and Future Plans MMCR Upgrades: Present Status and Future Plans K. B. Widener and A. S. Koontz Pacific Northwest National Laboratory Richland, Washington K. P. Moran and K. A. Clark National Oceanic and Atmospheric Administration Environmental Technology Laboratory Boulder, Colorado C. Chander STC xxxxxxxxx M. A. Miller and K. L. Johnson Brookhaven National Laboratory Upton, New York Abstract In September 2003, the Southern Great Plains (SGP) millimeter wave cloud radar (MMCR) was upgraded to a new digital signal processor that significantly increases the temporal resolution and the processing capability of the MMCR. The Barrow MMCR upgrade will be completed in early 2004. We will discuss the hardware and software C40 upgrade to the MMCRs at SGP and Barrow and the plans

56

Research Laboratory Experiments with Energy Efficiency Upgrades |  

Broader source: Energy.gov (indexed) [DOE]

Research Laboratory Experiments with Energy Efficiency Upgrades Research Laboratory Experiments with Energy Efficiency Upgrades Research Laboratory Experiments with Energy Efficiency Upgrades August 30, 2012 - 11:52am Addthis Energy efficiency upgrades -- such as geothermal heating and cooling, nanogel-filled windows, and lighting sensors -- will help the University of Kentucky Center for Applied Energy Research reduce energy use and save money. | Photo courtesy of the University of Kentucky. Energy efficiency upgrades -- such as geothermal heating and cooling, nanogel-filled windows, and lighting sensors -- will help the University of Kentucky Center for Applied Energy Research reduce energy use and save money. | Photo courtesy of the University of Kentucky. Julie McAlpin Communications Liaison, State Energy Program

57

Future Upgrades | Brookhaven and the LHC  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Future Upgrades Future Upgrades Magnetic field inside a Nb3Sn quadropole magnet Magnetic field inside a Nb3Sn quadropole magnet. Brookhaven leads various technical coordination efforts for the upgrade of the ATLAS detector, including constructing the new silicon tracker, liquid argon electronics, and the new muon chambers. Brookhaven also contributes to the commissioning and future upgrade of the LHC itself in two areas: accelerator physics and superconducting magnets. This work is carried out as part of the U.S. LHC Accelerator Research Program (LARP) in collaboration with Fermilab, Lawrence Berkeley National Lab, and the Stanford Linear Accelerator Center. The ultimate goal of the upgrade program is to increase the rate and efficiency of particle collisions, a measure known as luminosity.

58

Research Laboratory Experiments with Energy Efficiency Upgrades |  

Broader source: Energy.gov (indexed) [DOE]

Research Laboratory Experiments with Energy Efficiency Upgrades Research Laboratory Experiments with Energy Efficiency Upgrades Research Laboratory Experiments with Energy Efficiency Upgrades August 30, 2012 - 11:52am Addthis Energy efficiency upgrades -- such as geothermal heating and cooling, nanogel-filled windows, and lighting sensors -- will help the University of Kentucky Center for Applied Energy Research reduce energy use and save money. | Photo courtesy of the University of Kentucky. Energy efficiency upgrades -- such as geothermal heating and cooling, nanogel-filled windows, and lighting sensors -- will help the University of Kentucky Center for Applied Energy Research reduce energy use and save money. | Photo courtesy of the University of Kentucky. Julie McAlpin Communications Liaison, State Energy Program

59

Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

About About Printable Version Share this resource Send a link to Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades to someone by E-mail Share Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades on Facebook Tweet about Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades on Twitter Bookmark Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades on Google Bookmark Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades on Delicious Rank Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades on Digg Find More places to share Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades on AddThis.com... Our History Related Federal Programs Why Energy Efficiency Upgrades

60

EECBG Success Story: Energy Efficiency Upgrades Part of Winning...  

Energy Savers [EERE]

EECBG Success Story: Energy Efficiency Upgrades Part of Winning Formula for Oregon School District EECBG Success Story: Energy Efficiency Upgrades Part of Winning Formula for...

Note: This page contains sample records for the topic "rock grounding upgrades" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Federal Finance Facilities Available for Energy Efficiency Upgrades...  

Energy Savers [EERE]

Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy...

62

Algal Lipid Extraction and Upgrading to Hydrocarbons Technology...  

Broader source: Energy.gov (indexed) [DOE]

and upgrading pathway to be competitive with petroleum-derived gasoline-, diesel-, and jet-range hydrocarbon blendstocks. Algal Lipid Extraction and Upgrading to Hydrocarbons...

63

Weatherization and Workforce Guidelines for Home Energy Upgrades...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

for Home Energy Upgrades Fact Sheet Weatherization and Workforce Guidelines for Home Energy Upgrades Fact Sheet This fact sheet provides essential information about the 2011...

64

Standard Work Specifications for Single-Family Home Energy Upgrades...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

for Single-Family Home Energy Upgrades to define the minimum requirements for high- quality residential energy upgrades. The Standard Work Specifications for Single-Family...

65

Standard Work Specifications for Single-Family Home Energy Upgrades...  

Broader source: Energy.gov (indexed) [DOE]

for Single-Family Home Energy Upgrades to define the minimum requirements for high-quality residential energy upgrades. Today, the Standard Work Specifications provide a...

66

APS Upgrade | Advanced Photon Source  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

APS APS View Larger The brightness and energy of x-ray beams are critical properties for research. Higher brightness means more x-rays can be focused onto a smaller, laser-like spot, allowing researchers to gather more data in greater detail in less time. Higher energies allow x-rays to penetrate deeper inside materials to reveal crucial information about a material's structure and function. The combination of high brightness and high energy allows the observation and imaging - in real time - of fast and ultrafast technologically important processes, including fuel sprays, magnetic switching, and biological processes in living organisms. The APS Upgrade project will increase the brightness of the APS high-energy (hard) x-ray beams. This will equip researchers for the groundbreaking

67

APS Upgrade | Advanced Photon Source  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Workshop on new science opportunities provided by a multi-bend achromat lattice at the APS APS-U MBA Lattice Workshop Registration is now closed. Please contact Diane Wilkinson ext. 7810 or a member of the Workshop Organizing Committee for changes or modifications to your registration. Submit Comments, Suggestions, and Ideas for MBA Lattice Workshop October 21-22 Advanced Photon Source Argonne National Lab The Advanced Photon Source Upgrade is focused on delivering a powerful, versatile facility for science using high-brightness, high-energy X-rays. At APS, and around the light source community, scientists have been developing storage ring designs that push closer to the ultimate diffraction limit for X-ray sources. A recent report by the Basic Energy Sciences Advisory Committee, which advises the Director of the U.S.

68

ATLAS Nightly Build System Upgrade  

E-Print Network [OSTI]

The ATLAS Nightly Build System is a facility for automatic production of software releases. Being the major component of ATLAS software infrastructure, it supports more than 50 multi-platform branches of nightly releases and provides ample opportunities for testing new packages, for verifying patches to existing software, and for migrating to new platforms and compilers. The Nightly System testing framework runs several hundred integration tests of different granularity and purpose. The nightly releases are distributed and validated, and some are transformed into stable releases used for data processing worldwide. The first LHC long shutdown (2013-2015) activities will elicit increased load on the Nightly System as additional releases and builds are needed to exploit new programming techniques, languages, and profiling tools. This paper describes the plan of the ATLAS Nightly Build System Long Shutdown upgrade. It brings modern database and web technologies into the Nightly System, improves monitoring of nigh...

Dimitrov, G; The ATLAS collaboration; Simmons, B; Undrus, A

2013-01-01T23:59:59.000Z

69

Rock Magnetism To-Day  

Science Journals Connector (OSTI)

... ROCK magnetism is that branch of geophysics that deals with the origin of magnetization in rocks and ... that deals with the origin of magnetization in rocks and its stability. Workers in rock magnetism are also interested in the phenomenon of self-reversal, that is, a rock acquiring ...

SUBIR K. BANERJEE

1966-02-12T23:59:59.000Z

70

Session: Hard Rock Penetration  

SciTech Connect (OSTI)

This session at the Geothermal Energy Program Review X: Geothermal Energy and the Utility Market consisted of five presentations: ''Hard Rock Penetration - Summary'' by George P. Tennyson, Jr.; ''Overview - Hard Rock Penetration'' by James C. Dunn; ''An Overview of Acoustic Telemetry'' by Douglas S. Drumheller; ''Lost Circulation Technology Development Status'' by David A. Glowka; ''Downhole Memory-Logging Tools'' by Peter Lysne.

Tennyson, George P. Jr.; Dunn, James C.; Drumheller, Douglas S.; Glowka, David A.; Lysne, Peter

1992-01-01T23:59:59.000Z

71

12 GeV Upgrade | Jefferson Lab  

Broader source: All U.S. Department of Energy (DOE) Office Webpages

Science Science A Schematic of the 12 GeV Upgrade The 12 GeV Upgrade will greatly expand the research capabilities of Jefferson Lab, adding a fourth experimental hall, upgrading existing halls and doubling the power of the lab's accelerator. A D D I T I O N A L L I N K S: 12 GeV Home Public Interest Scientific Opportunities Hall D Status Updates Contacts Three-Year Accelerator Schedule 2014 - 2016 top-right bottom-left-corner bottom-right-corner 12 GeV Upgrade Physicists at Jefferson Lab are trying to find answers to some of nature's most perplexing questions about the universe by exploring the nucleus of the atom. Their goal is to answer such questions as: "What is the universe made of?" and "What holds everyday matter together?" In their search for answers, physicists smash electrons into atoms using

72

PHOENIX ENERGIZES LIGHT RAIL CORRIDOR WITH UPGRADES  

Broader source: Energy.gov [DOE]

Designed to promote energy efficiency in buildings in Phoenix, Arizona’s 10-mile-long Light Rail Corridor, Energize Phoenix focused on performing energy upgrades and reducing energy use in...

73

EMPOWERING SANTA BARBARA TO INVEST IN UPGRADES  

Broader source: Energy.gov [DOE]

In Santa Barbara County, California, the weather is so temperate that even the least energy-efficient homes can still feel comfortable year-round. To help residents see that energy upgrades can...

74

MAST Upgrade Advancing compact fusion sources  

E-Print Network [OSTI]

as a stepping stone to greater involvement in the fusion sector and, in particular, the commercial opportunities to fusion research. MAST Upgrade will build on this progress, providing a truly world-class device capable

75

RECOVERY ACT: TAPOCO PROJECT: CHEOAH UPGRADE  

SciTech Connect (OSTI)

Under Funding Opportunity Announcement Number: DE-FOA-0000120, Recovery Act: Hydroelectric Facility Modernization, Alcoa Power Generating Inc. (APGI), a fully owned subsidiary of Alcoa Inc., implemented major upgrades at its Cheoah hydroelectric facility near Robbinsville, North Carolina.

Paul Tran; 293 Highway 740; Baden, NC 28009

2013-02-28T23:59:59.000Z

76

The upgraded scheme of Hefei Light Source  

SciTech Connect (OSTI)

To enhance the performance of Hefei Light Source, which was designed and constructed two decades ago, an upgrade project would be carried out in the near future. The detail upgrade scheme was described in this paper. Firstly, the magnet lattice of storage ring should be reconstructed with 4 DBA cells, whose advantages are lower beam emittance and more straight section available for insertion devices. Secondly, the beam diagnostics, main power supply, transverse and longitudinal multi-bunch feedback, beam control and manipulation system would be upgrade to improve the beam orbit stability. Finally, the injection system of storage ring and injector, which is composed of electron linac and beam transfer line, would be updated in order to assure smooth beam accumulation process under new low emittance lattice. With above improvement, it is hopeful to increase the brilliance of Hefei Light Source by two orders approximately. After three-year upgrade project, the performance of HLS would meet the demands of advanced SR users.

Li Weimin; Xu Hongliang; Wang Lin; Feng Guangyao; Zhang Shancai; Hao Hao [National Synchrotron Radiation Laboratory of University of Science and Technology of China, Anhui (China)

2010-06-23T23:59:59.000Z

77

Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Honeymoons Honeymoons Lead to Upgrades in Western Vermont to someone by E-mail Share Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in Western Vermont on Facebook Tweet about Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in Western Vermont on Twitter Bookmark Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in Western Vermont on Google Bookmark Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in Western Vermont on Delicious Rank Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in Western Vermont on Digg Find More places to share Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in Western Vermont on AddThis.com... Better Buildings Residential Network Progress

78

High Flux Isotope Reactor power upgrade status  

SciTech Connect (OSTI)

A return to 100-MW operation is being planned for the High Flux Isotope Reactor (HFIR). Recent improvements in fuel element manufacturing procedures and inspection equipment will be exploited to reduce hot spot and hot streak factors sufficiently to permit the power upgrade without an increase in primary coolant pressure. Fresh fuel elements already fabricated for future use are being evaluated individually for power upgrade potential based on their measured coolant channel dimensions.

Rothrock, R.B.; Hale, R.E. [Oak Ridge National Lab., TN (United States); Cheverton, R.D. [Delta-21 Resources Inc., Oak Ridge, TN (United States)

1997-03-01T23:59:59.000Z

79

Ground Electromagnetic Techniques | Open Energy Information  

Open Energy Info (EERE)

Ground Electromagnetic Techniques Ground Electromagnetic Techniques Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Technique: Ground Electromagnetic Techniques Details Activities (0) Areas (0) Regions (0) NEPA(0) Exploration Technique Information Exploration Group: Geophysical Techniques Exploration Sub Group: Electrical Techniques Parent Exploration Technique: Electromagnetic Techniques Information Provided by Technique Lithology: Rock composition, mineral and clay content Stratigraphic/Structural: Detection of permeable pathways, fracture zones, faults Hydrological: Resistivity influenced by porosity, grain size distribution, permeability, fluid saturation, fluid type and phase state of the pore water Thermal: Resistivity influenced by temperature Dictionary.png

80

IPNS upgrade: A feasibility study  

SciTech Connect (OSTI)

Many of Argonne National Laboratory`s (ANL`s) scientific staff members were very active in R&D work related to accelerator-based spoliation sources in the 1970s and early 1980s. In 1984, the Seitz/Eastman Panel of the National Academy of Sciences reviewed U.S. materials science research facilities. One of the recommendations of this panel was that the United States build a reactor-based steady-state source, the Advanced Neutron Source (ANS), at Oak Ridge National Laboratory. Subsequently, R&D activities related to the design of an accelerator-based source assumed a lower priority. The resumption of pulsed-source studies in this country started simultaneously with design activities in Europe aimed at the European Spallation Source (ESS). The European Community funded a workshop in September 1991 to define the parameters of the ESS. Participants in this workshop included both accelerator builders and neutron source users. A consortium of European countries has proposed to build a 5-MW pulsed source, and a feasibility study is currently under way. Soon after the birth of the ESS, a small group at ANL set about bringing themselves up to date on pulsed-source information since 1984 and studied the feasibility of upgrading ANL`s Intense Pulsed Neutron Source (IPNS) to 1 MW by means of a rapidly cycling synchrotron that could be housed, along with its support facilities, in existing buildings. In early 1993, the Kohn panel recommended that (1) design and construction of the ANS should be completed according to the proposed project schedule and (2) development of competitive proposals for cost-effective design and construction of a 1-MW pulsed spallation source should be authorized immediately.

NONE

1995-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "rock grounding upgrades" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Climate balance of biogas upgrading systems  

SciTech Connect (OSTI)

One of the numerous applications of renewable energy is represented by the use of upgraded biogas where needed by feeding into the gas grid. The aim of the present study was to identify an upgrading scenario featuring minimum overall GHG emissions. The study was based on a life-cycle approach taking into account also GHG emissions resulting from plant cultivation to the process of energy conversion. For anaerobic digestion two substrates have been taken into account: (1) agricultural resources and (2) municipal organic waste. The study provides results for four different upgrading technologies including the BABIU (Bottom Ash for Biogas Upgrading) method. As the transport of bottom ash is a critical factor implicated in the BABIU-method, different transport distances and means of conveyance (lorry, train) have been considered. Furthermore, aspects including biogas compression and energy conversion in a combined heat and power plant were assessed. GHG emissions from a conventional energy supply system (natural gas) have been estimated as reference scenario. The main findings obtained underlined how the overall reduction of GHG emissions may be rather limited, for example for an agricultural context in which PSA-scenarios emit only 10% less greenhouse gases than the reference scenario. The BABIU-method constitutes an efficient upgrading method capable of attaining a high reduction of GHG emission by sequestration of CO{sub 2}.

Pertl, A., E-mail: andreas.pertl@boku.ac.a [Institute of Waste Management, Department of Water, Atmosphere and Environment, University of Natural Resources and Applied Life Sciences, Vienna, Muthgasse 107, A-1190 Wien (Austria); Mostbauer, P.; Obersteiner, G. [Institute of Waste Management, Department of Water, Atmosphere and Environment, University of Natural Resources and Applied Life Sciences, Vienna, Muthgasse 107, A-1190 Wien (Austria)

2010-01-15T23:59:59.000Z

82

HERA Upgrade Project | Superconducting Magnet Division  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

HERA Upgrade Project HERA Upgrade Project As part of the HERA luminosity upgrade, 6 superconducting Interaction Region quadrupoles were delivered, accepted, and are in service. These 6 layer magnets were designed to include the main quadrupole focus, a skew quad, a normal and skew dipole, and a final sextupole layer. Because of the physical space constraints imposed by the existing detector region components, the DESY magnets were of necessity designed to be very compact. In addition, they are also are required to operate within the solenoidal detector fields at the collision points, so all construction materials had to be non magnetic. Two types of DESY magnets were fabricated. The first, designated as G0, was a two meter long, constant radius magnet. The second, designated GG, is a

83

ATLAS upgrade June09_v3  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ATLAS efficiency and intensity upgrade ATLAS efficiency and intensity upgrade Guy Savard and Robert V. F. Janssens June 12, 2009 The ATLAS facility is on a constant quest to improve and increase the capabilities it offers to its Users. ATLAS currently provides beams of essentially all stable isotopes at energies in the vicinity of the Coulomb barrier. These can be used in conjunction with a suite of state-of-the-art instruments such as Gammasphere, the Fragment Mass Analyzer (FMA), the Canadian Penning Trap mass spectrometer (CPT), the split-pole spectrograph, an in-flight radioactive beam line, and the recently commissioned HELIOS spectrometer. At present, these capabilities are being augmented by (1) the addition of the CARIBU upgrade, which will provide low-intensity, neutron-rich radioactive beams from Californium fission fragments in both low-energy and re-

84

Instrumentation upgrades for the Macromolecular Crystallography beamlines  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Instrumentation upgrades for the Macromolecular Crystallography beamlines Instrumentation upgrades for the Macromolecular Crystallography beamlines of the Swiss Light Source Monday, October 29, 2012 - 2:00am SSRL, Bldg. 137, Rm. 322 Martin Fuchs, MX Group, Swiss Light Source; Paul Scherrer Institute (Villigen, Switzerland) A new unified diffractometer - the D3 - has been developed for the three MX beamlines. The first of the instruments is in general user operation at beamline X10SA since April 2012. The varied demands from both challenging academic research projects as well as high throughput industrial applications on today's macromolecular crystallography beamlines drive developments to both endstations and beamline optics. Recent instrumentation upgrades to the macromolecular crystallography (MX) beamlines of the Swiss Light Source therefore aimed to

85

Damage and collapse of double hull tankers in groundings  

SciTech Connect (OSTI)

This paper will discuss and analyze the mechanics of ships in groundings on rock. A damage estimate model in grounding of ships is proposed. The accuracy and applicability of the model are verified by a comparison of experimental results. The progressive collapse analysis of damaged hull sections, under vertical bending moments by use of the ALPS/ISUM computer code, is described. The procedure is applied to grounding simulation of a double hull tanker with transverseless system.

Paik, J.K.; Lee, T.K. [Pusan National Univ. (Korea, Republic of). Dept. of Naval Architecture and Ocean Engineering

1995-12-31T23:59:59.000Z

86

Seismic design technology for breeder reactor structures. Volume 1. Special topics in earthquake ground motion  

SciTech Connect (OSTI)

This report is divided into twelve chapters: seismic hazard analysis procedures, statistical and probabilistic considerations, vertical ground motion characteristics, vertical ground response spectrum shapes, effects of inclined rock strata on site response, correlation of ground response spectra with intensity, intensity attenuation relationships, peak ground acceleration in the very mean field, statistical analysis of response spectral amplitudes, contributions of body and surface waves, evaluation of ground motion characteristics, and design earthquake motions. (DLC)

Reddy, D.P.

1983-04-01T23:59:59.000Z

87

Better Buildings Neighborhood Program: Energy Upgrade California Drives  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Energy Upgrade Energy Upgrade California Drives Demand From Behind the Wheel to someone by E-mail Share Better Buildings Neighborhood Program: Energy Upgrade California Drives Demand From Behind the Wheel on Facebook Tweet about Better Buildings Neighborhood Program: Energy Upgrade California Drives Demand From Behind the Wheel on Twitter Bookmark Better Buildings Neighborhood Program: Energy Upgrade California Drives Demand From Behind the Wheel on Google Bookmark Better Buildings Neighborhood Program: Energy Upgrade California Drives Demand From Behind the Wheel on Delicious Rank Better Buildings Neighborhood Program: Energy Upgrade California Drives Demand From Behind the Wheel on Digg Find More places to share Better Buildings Neighborhood Program: Energy Upgrade California Drives Demand From Behind the Wheel on

88

Missouri Water Treatment Plant Upgraded | Department of Energy  

Energy Savers [EERE]

Missouri Water Treatment Plant Upgraded Missouri Water Treatment Plant Upgraded July 13, 2010 - 11:30am Addthis The high service pumps at the St. Peters Water Treatment Plant are...

89

EECBG Success Story: Missouri Water Treatment Plant Upgraded...  

Energy Savers [EERE]

Missouri Water Treatment Plant Upgraded EECBG Success Story: Missouri Water Treatment Plant Upgraded July 13, 2010 - 11:30am Addthis The high service pumps at the St. Peters Water...

90

Bio-oils Upgrading for Second Generation Biofuels  

Science Journals Connector (OSTI)

Bio-oils Upgrading for Second Generation Biofuels ... The present review is then focused on the upgrading possibilities of renewable nonedible feedstocks, obtained from biomass fast pyrolysis or liquefaction, in petroleum refineries, toward the production of second generation biofuels. ...

Inês Graça; José M. Lopes; Henrique S. Cerqueira; Maria F. Ribeiro

2012-11-21T23:59:59.000Z

91

Upgrading : an alternative approach towards housing reform in China  

E-Print Network [OSTI]

The thesis is a study on urban housing upgrading in China. The main objective is to look at upgrading, which has been widely used in many developing countries, as an alternative approach to solving the existing urban housing ...

He, Fang, 1956-

1989-01-01T23:59:59.000Z

92

EECBG Success Story: HVAC Upgrade Saving Money, Protecting History...  

Broader source: Energy.gov (indexed) [DOE]

HVAC Upgrade Saving Money, Protecting History EECBG Success Story: HVAC Upgrade Saving Money, Protecting History November 2, 2010 - 5:37pm Addthis A new heating and cooling system...

93

UPGRADE AND EVALUATION OF A LIGHTNING DETECTION SYSTEM  

E-Print Network [OSTI]

/11/2004 page 3 of 17 1 INTRODUCTION KNMI (Royal Netherlands Meteorological Institute) has upgraded itsUPGRADE AND EVALUATION OF A LIGHTNING DETECTION SYSTEM Hans Beekhuis Iwan Holleman the Netherlands

Stoffelen, Ad

94

Nuclear Materials Safeguards and Security Upgrade Project Completed...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Safeguards and Security Upgrade Project Completed Under Budget | National Nuclear Security Administration People Mission Managing the Stockpile Preventing Proliferation Powering...

95

Work Authorization Document NSTX Upgrade Project  

E-Print Network [OSTI]

Work Authorization Document NSTX Upgrade Project Control Account #: 7900 Title: WBS 1.7.3 Title Functional Manager L. Dudek Approvals Signature Date NSTX-U Project Manager R. Strykowsky 4- WBS Dictionary procedures and documents to support the integrated tests, and to support performance of the pre

Princeton Plasma Physics Laboratory

96

Steam turbine upgrades: A utility based approach  

SciTech Connect (OSTI)

In the increasingly competitive power generation markets utilities must strive towards lower electricity generation costs, whilst relying on an aging steam turbine fleet. By the year 2000 more than 25% of the global steam turbine capacity will be older than 30 years. The heat rate of such units is generally considerably higher than that of equivalent new plant, and such equipment can be further disadvantaged by increased maintenance costs and forced outage rates. Over the past decade steam turbine conversion, modification, and upgrade packages have become an increasingly important part of the European steam turbine market. Furthermore, many utilities now realize that enhanced cost-effectiveness can often be obtained by moving away from the original equipment manufacturer (OEM), and the upgrading of other manufacturers' plant is now routine within the steam turbine industry. By working closely with customers, GE has developed a comprehensive range of steam turbine upgrade packages, including advanced design steampaths which can increase the performance of existing turbine installations to levels comparable with new plant. Such packages are tailor-made to the requirements of each customer, to ensure that the most cost-effective engineering solution is identified. This paper presents an overview of GE's state-of-the-art steam turbine technology, and continues to describe typical economic models for turbine upgrades.

Wakeley, G.R.

1998-07-01T23:59:59.000Z

97

MAST-Upgrade Advancing compact fusion sources  

E-Print Network [OSTI]

of innovation. It will also put the UK in a leading position to develop engineering systems for the future to the drive towards commercial fusion power. 1. Testing reactor concepts. MAST-Upgrade will be the first machine to include the Super-X divertor design, an innovative plasma exhaust system that, if successful

98

ATLAS Upgrades Towards the High Luminosity LHC  

E-Print Network [OSTI]

After successful LHC operation at the center-of-mass energy of 7 and 8 TeV in 2011 and 2012, plans are actively advancing for a series of upgrades, culminating roughly 10 years from now in the high luminosity LHC (HL-LHC) project, delivering of order five times the LHC nominal instantaneous luminosity along with luminosity levelling. The final goal is to extend the data set from about few hundred fb?1 expected for LHC running to 3000 fb?1 by around 2030. Current planning in ATLAS also has significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades to accommodate running already beyond nominal luminosity this decade. The challenge of coping with HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for an all-new inner-tracker, significant upgrades in the calorimeter and muon systems, as well as improved triggers and data a...

Cinca, D; The ATLAS collaboration

2014-01-01T23:59:59.000Z

99

CMS: Present status, limitations, and upgrade plans  

SciTech Connect (OSTI)

An overview of the CMS upgrade plans will be presented. A brief status of the CMS detector will be given, covering some of the issues we have so far experienced. This will be followed by an overview of the various CMS upgrades planned, covering the main motivations for them, and the various R&D efforts for the possibilities under study. The CMS detector has been working extremely well since the start of data-taking at the LHC as is evidenced by the numerous excellent results published by CMS and presented at this workshop and recent conferences. Less well documented are the various issues that have been encountered with the detector. In the spirit of this workshop I will cover some of these issues with particular emphasis on problems that motivate some of the upgrades to the CMS detector for this decade of data-taking. Though the CMS detector has been working extremely well and expectations are great for making the most of the LHC luminosity, there have been a number of issues encountered so far. Some of these have been described and while none currently presents a problem for physics performance, some of them are expected to become more problematic, especially at the highest Phase 1 luminosities for which the majority of the integrated luminosity will be collected. These motivate upgrades for various parts of the CMS detector so that the current excellent physics performance can be maintained or even surpassed in the realm of the highest Phase 1 luminosities.

Cheung, H.W.K.; /Fermilab; ,

2011-09-01T23:59:59.000Z

100

Work Authorization Document NSTX Upgrade Project  

E-Print Network [OSTI]

heating system. The system will be composed of an AC/DC power conversion system, gyrotron source or other operational characteristic for the system will require upgrade. Only disruption qualification The Electron Cyclotron Heating System provides breakdown and startup assist through an electron cyclotron

Princeton Plasma Physics Laboratory

Note: This page contains sample records for the topic "rock grounding upgrades" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Financing Energy Upgrades for K-12 School Districts  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Financing Energy Upgrades for K-12 School Districts Financing Energy Upgrades for K-12 School Districts Page 2 Table of Contents Introduction................................................................................................................................................................................................................... 4 What This Guide Covers .................................................................................................................................................................................. 6 Chapter 1: Principles of Financing Energy Upgrades for Schools .................................................................................................. 7 Principle 1. Start with Clear Project Objectives.......................................................................................................................................... 7

102

Microwave assisted hard rock cutting  

DOE Patents [OSTI]

An apparatus for the sequential fracturing and cutting of subsurface volume of hard rock (102) in the strata (101) of a mining environment (100) by subjecting the volume of rock to a beam (25) of microwave energy to fracture the subsurface volume of rock by differential expansion; and , then bringing the cutting edge (52) of a piece of conventional mining machinery (50) into contact with the fractured rock (102).

Lindroth, David P. (Apple Valley, MN); Morrell, Roger J. (Bloomington, MN); Blair, James R. (Inver Grove Heights, MN)

1991-01-01T23:59:59.000Z

103

Upgrade of CEBAF from 6 Gev To 12 Gev: Status  

SciTech Connect (OSTI)

The CEBAF accelerator is being upgraded from 6 GeV to 12 GeV by the US Department of Energy. The accelerator upgrade is being done within the existing tunnel footprint. The accelerator upgrade includes: 10 new srfbased high-performance cryomodules plus RF systems, doubling the 2K helium plant's capability, upgrading the existing beamlines to operate at nearly double the original performance envelope, and adding a beamline to a new experimental area. Construction is over 75% complete with final completion projected for late FY13. Details of the upgrade and status of the work will be presented.

Harwood, Leigh [Jefferson Lab, 12000 Jefferson Ave, Newport News, VA, 23606 (United States)

2013-04-19T23:59:59.000Z

104

Energy Star Building Upgrade Value Calculator | Open Energy Information  

Open Energy Info (EERE)

Energy Star Building Upgrade Value Calculator Energy Star Building Upgrade Value Calculator Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Energy Star Building Upgrade Value Calculator (for Office Properties) Agency/Company /Organization: ENERGY STAR Phase: "Evaluate Options and Determine Feasibility" is not in the list of possible values (Bring the Right People Together, Create a Vision, Determine Baseline, Evaluate Options, Develop Goals, Prepare a Plan, Get Feedback, Develop Finance and Implement Projects, Create Early Successes, Evaluate Effectiveness and Revise as Needed) for this property. User Interface: Spreadsheet Website: www.energystar.gov/index.cfm?c=comm_real_estate.building_upgrade_value The Building Upgrade Value Calculator allows practitioners to analyze the

105

ATU Advanced Technology Upgrading Ltd | Open Energy Information  

Open Energy Info (EERE)

ATU Advanced Technology Upgrading Ltd ATU Advanced Technology Upgrading Ltd Jump to: navigation, search Name ATU (Advanced Technology Upgrading) Ltd Place Israel Product Focused on development of rechargeable magnesium battery. References ATU (Advanced Technology Upgrading) Ltd[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. ATU (Advanced Technology Upgrading) Ltd is a company located in Israel . References ↑ "ATU (Advanced Technology Upgrading) Ltd" Retrieved from "http://en.openei.org/w/index.php?title=ATU_Advanced_Technology_Upgrading_Ltd&oldid=342420" Categories: Clean Energy Organizations Companies Organizations Stubs What links here Related changes Special pages Printable version

106

An Upgrade Proposal from the PHENIX Collaboration  

E-Print Network [OSTI]

In this document the PHENIX collaboration proposes a major upgrade to the PHENIX detector at the Relativistic Heavy Ion Collider. This upgrade, sPHENIX, enables an extremely rich jet and beauty quarkonia physics program addressing fundamental questions about the nature of the strongly coupled quark-gluon plasma (QGP), discovered experimentally at RHIC to be a perfect fluid. The startling dynamics of the QGP on fluid-like length scales is an emergent property of quantum chromodynamics (QCD), seemingly implicit in the Lagrangian but stubbornly hidden from view. QCD is an asymptotically free theory, but how QCD manifests as a strongly coupled fluid with specific shear viscosity near $T_C$, as low as allowed by the uncertainty principle, is as fundamental an issue as that of how confinement itself arises.

Adare, A; Aidala, C; Ajitanand, N N; Akiba, Y; Akimoto, R; Alexander, J; Aoki, K; Apadula, N; Asano, H; Atomssa, E T; Awes, T C; Azmoun, B; Babintsev, V; Bai, M; Bai, X; Bandara, N; Bannier, B; Barish, K N; Baron, O; Bassalleck, B; Bathe, S; Baublis, V; Baumgart, S; Bazilevsky, A; Beaumier, M; Beckman, S; Belmont, R; Benjamin, G; Berdnikov, A; Berdnikov, Y; Blackburn, J; Blau, D S; Bobrek, M; Bok, J; Boose, S; Boyle, K; Britton,, C L; Brooks, M L; Bryslawskyj, J; Bumazhnov, V; Butler, C; Butsyk, S; Campbell, S; Carollo, A; Chai, J -S; Chen, C -H; Chernichenko, S; Chi, C Y; Chiu, M; Choi, I J; Choi, J B; Choi, S; Chollet, S; Christiansen, P; Chujo, T; Cianciolo, V; Citron, Z; Cole, B A; Cronin, N; Crossett, N; Csanád, M; D'Orazio, L; Dairaku, S; Danley, D; Datta, A; Daugherity, M S; David, G; DeBlasio, K; Debraine, A; Dehmelt, K; Denisov, A; Deshpande, A; Desmond, E J; Dietzsch, O; Ding, L; Dion, A; Diss, P B; Do, J H; Donadelli, M; Drapier, O; Drees, A; Drees, K A; Durham, J M; Durum, A; Eberle, L; Efremenko, Y V; Engelmore, T; Enokizono, A; Esumi, S; Eyser, K O; Fadem, B; Feege, N; Fields, D E; Finger, M; FingerJr., M; Fleuret, F; Fokin, S L; Frantz, J E; Franz, A; Frawley, A D; Fukao, Y; Fusayasu, T; Gainey, K; Gal, C; Gallus, P; Garg, P; Garishvili, A; Garishvili, I; Gastaldi, F; Ge, H; Giannotti, P; Giordarno, F; Glenn, A; Gong, X; Gonin, M; Goto, Y; de Cassagnac, R Granier; Grau, N; Greene, S V; Perdekamp, M Grosse; Gu, Y; Gunji, T; Guragain, H; Hachiya, T; Haggerty, J S; Hahn, K I; Hamagaki, H; Hamilton, H F; Han, S Y; Hanks, J; Hasegawa, S; Haseler, T O S; Hashimoto, K; Hayano, R; Hayashi, S; He, X; Hemmick, T K; Hester, T; Hill, J C; Hoefferkamp, M; Hollis, R S; Homma, K; Hong, B; Hori, Y; Hoshino, T; Huang, J; Huang, S; Hutchins, J R; Ichihara, T; Ikeda, Y; Imai, K; Imazu, Y; Imrek, J; Inaba, M; Iordanova, A; Isenhower, D; Isinhue, A; Isupov, A; Ivanischev, D; Ivanov, V; Jacak, B V; Jeon, S J; Jezghani, M; Jia, J; Jiang, X; Johnson, B M; Joo, K S; Jouan, D; Jumper, D S; Kamin, J; Kanda, S; Kang, B H; Kang, J H; Kang, J S; Kapustinsky, J; Karatsu, K; Kawall, D; Kazantsev, A V; Kehayias, H -J; Key, J A; Khachatryan, V; Khandai, P K; Khanzadeev, A; Kijima, K M; Kim, C; Kim, D H; Kim, D J; Kim, E -J; Kim, H J; Kim, K -B; Kim, M; Kim, Y -J; Kim, Y K; Kimelman, B; Kiss, Á; Kistenev, E; Kitamura, R; Klatsky, J; Kleinjan, D; Kline, P; Koblesky, T; Kochenda, L; Kofarago, M; Komatsu, Y; Komkov, B; Koster, J; Kotchetkov, D; Kotov, D; Kravtsov, P; Krizek, F; Kurita, K; Kuriyama, M; Kurosawa, M; Kwon, Y; Lacey, R; Lai, Y S; Lajoie, J G; Lebedev, A; Lee, G H; Lee, J; Lee, K B; Lee, K S; Lee, S; Lee, S H; Lefferts, R; Leitch, M J; Leite, M A L; Leitgab, M; Lewis, B; Li, X; Lim, S H; Lipski, A; Litvinenko, A; Liu, M X; Love, B; Lynch, D; Lynch, M; Maguire, C F; Makdisi, Y I; Makek, M; Malakhov, A; Manion, A; Manko, V I; Mannel, E; Maruyama, T; Masumoto, S; McCumber, M; McGaughey, P L; McGlinchey, D; McKay, R; McKinney, C; Meles, A; Mendoza, M; Menegasso, R; Meredith, B; Miake, Y; Mibe, T; Mignerey, A C; Milov, A; Mishra, D K; Mitchell, J T; Miyasaka, S; Mizuno, S; Mohanty, A K; Montuenga, P; Moon, T; Morrison, D P; Moskowitz, M; Motschwiller, S; Moukhanova, T V; Murakami, T; Murata, J; Mwai, A; Nagae, T; Nagamiya, S; Nagashima, K; Nagle, J L; Nagy, M I; Nakagawa, I; Nakagomi, H; Nakamiya, Y; Nakamura, K R; Nakamura, T; Nakano, K; Nattrass, C; Nederlof, A; Netrakanti, P K; Nihashi, M; Niida, T; Ninomiya, K; Nishimura, S; Northacker, D; Nouicer, R; Novak, T; Novitzky, N; Nukariya, A; Nyanin, A S; O'Brien, E; Ogilvie, C A; Oide, H; Okada, K; Koop, J D Orjuela; Osborn, J D; Oskarsson, A; Österman, L; Ozawa, K; Pancake, C; Pantuev, V; Papavassiliou, V; Park, I H; Park, J S; Park, S; Park, S K; Pate, S F; Patel, L; Patel, M; Peng, J -C; Perepelitsa, D; Perera, G D N; Peresedov, V; Peressounko, D Yu; Perry, J; Petti, R; Pinkenburg, C; Pinson, R; Pisani, R P; Popule, J; Purschke, M L; Qu, H; Radhakrishnan, S; Rak, J; Ramson, B J; Ravinovich, I; Read, K F; Reynolds, D; Reynolds, R; Riabov, V; Riabov, Y; Richardson, E; Rinn, T; Riveli, N; Roach, D; Rolnick, S D; Rosati, M; Roschin, E; Rowan, Z; Rubin, J G; Rukoyatkin, P; Ryu, M S; Safonov, A; Sahlmueller, B; Saito, N; Sakaguchi, T; Sako, H; Samsonov, V; Sano, M; Sarsour, M; Sato, S; Sawada, S; Schaefer, B; Schmoll, B K; Sedgwick, K; Seele, J; Seidl, R; Sekiguchi, Y; Sen, A; Seto, R; Sett, P; Sexton, A; Shafto, E; Sharma, D; Shaver, A; Shein, I; Shibata, T -A; Shigaki, K; Shimomura, M; Shoji, K; Shukla, P; Sicho, P; Sickles, A; Silva, C L; Silvermyr, D; Singh, B K; Singh, C P; Singh, V; Sippach, F W; Skolnik, M; Snowball, M; Solano, S; Soldatov, A; Soltz, R A; Sondheim, W E; Sorensen, S P; Soumya, M; Sourikova, I V; Stankus, P W; Steinberg, P; Stenlund, E; Stepanov, M; Ster, A; Stevens, L; Stoll, S P; Stone, M R; Sugitate, T; Sukhanov, A; Sumita, T; Sun, J; Sziklai, J; Takagui, E M

2015-01-01T23:59:59.000Z

107

CHALLENGES FOR THE SNS RING ENERGY UPGRADE  

SciTech Connect (OSTI)

The Oak Ridge Spallation Neutron Source accumulator ring presently operates at a beam power of about 1 MW with a beam energy of about 910 MeV. A power upgrade is planned to increase the beam energy to 1.3 GeV. For the accumulator ring this mostly involves modifications to the injection and extraction sections. A variety of modifications to the existing injection section were necessary to achieve 1 MW, and the tools developed and the lessons learned from this work are now being applied to the design of the new injection section. This paper will discuss the tools and the lessons learned, and also present the design and status of the upgrades to the accumulator ring.

Plum, Michael A [ORNL; Gorlov, Timofey V [ORNL; Holmes, Jeffrey A [ORNL; Hunter, W Ted [ORNL; Roseberry, Jr., R Tom [ORNL; Wang, Jian-Guang [ORNL

2012-01-01T23:59:59.000Z

108

The PS Upgrade Program: Recent Advances  

E-Print Network [OSTI]

The LHC Injectors Upgrade project (LIU) has been initiated to improve the performances of the existing injector complex at CERN to match the future requirements of the HL-LHC (High Luminosity LHC). In this framework, the Proton Synchrotron (PS) will undergo fundamental changes for many of its main systems: the injection energy will be increased to reduce space-charge effects, the transverse damper will be improved to cope with transverse instabilities, and the RF systems will be upgraded to accelerate higher beam intensity and brightness. These hardware improvements are triggered by a series of studies meant to identify the most critical performance bottlenecks, like space charge, impedances, longitudinal and transverse instabilities, as well as electron-cloud. Additionally, alternative production schemes for the LHC-type beams have been proposed and implemented to circumvent some of the present limitations. A summary of the most recent advances of the studies, as well as the proposed hardware improvements is...

Gilardoni, SS; Bertone, C; Biancacci, N; Blas, A; Damjanovic, S; Bodart, D; Borburgh, J; Chiggiato, P; Damerau, H; Devine, JD; Dobers, T; Gourber-Pace, M; Hancock, S; Huschauer, A; Iadarola, G; Lopez Hernandez, LA; Masi, A; Mataguez, S; M´etral, E; Paoluzzi, M; Persichelli, S; Pittet, S; Rossi, C; Roesler, S; Rumolo, G; Salvant, B; Steerenberg, R; Sterbini, G; Vollaire, J; Wasef, R; Ventura, L; Yin Vallgren, C; Migliorati, M

2013-01-01T23:59:59.000Z

109

An Upgrade Proposal from the PHENIX Collaboration  

E-Print Network [OSTI]

In this document the PHENIX collaboration proposes a major upgrade to the PHENIX detector at the Relativistic Heavy Ion Collider. This upgrade, sPHENIX, enables an extremely rich jet and beauty quarkonia physics program addressing fundamental questions about the nature of the strongly coupled quark-gluon plasma (QGP), discovered experimentally at RHIC to be a perfect fluid. The startling dynamics of the QGP on fluid-like length scales is an emergent property of quantum chromodynamics (QCD), seemingly implicit in the Lagrangian but stubbornly hidden from view. QCD is an asymptotically free theory, but how QCD manifests as a strongly coupled fluid with specific shear viscosity near $T_C$, as low as allowed by the uncertainty principle, is as fundamental an issue as that of how confinement itself arises.

A. Adare; S. Afanasiev; C. Aidala; N. N. Ajitanand; Y. Akiba; R. Akimoto; J. Alexander; K. Aoki; N. Apadula; H. Asano; E. T. Atomssa; T. C. Awes; B. Azmoun; V. Babintsev; M. Bai; X. Bai; N. Bandara; B. Bannier; K. N. Barish; O. Baron; B. Bassalleck; S. Bathe; V. Baublis; S. Baumgart; A. Bazilevsky; M. Beaumier; S. Beckman; R. Belmont; G. Benjamin; A. Berdnikov; Y. Berdnikov; J. Blackburn; D. S. Blau; M. Bobrek; J. Bok; S. Boose; K. Boyle; C. L. Britton, Jr.; M. L. Brooks; J. Bryslawskyj; V. Bumazhnov; C. Butler; S. Butsyk; S. Campbell; A. Carollo; J. -S. Chai; C. -H. Chen; S. Chernichenko; C. Y. Chi; M. Chiu; I. J. Choi; J. B. Choi; S. Choi; S. Chollet; P. Christiansen; T. Chujo; V. Cianciolo; Z. Citron; B. A. Cole; N. Cronin; N. Crossett; M. Csanád; L. D'Orazio; S. Dairaku; D. Danley; A. Datta; M. S. Daugherity; G. David; K. DeBlasio; A. Debraine; K. Dehmelt; A. Denisov; A. Deshpande; E. J. Desmond; O. Dietzsch; L. Ding; A. Dion; P. B. Diss; J. H. Do; M. Donadelli; O. Drapier; A. Drees; K. A. Drees; J. M. Durham; A. Durum; L. Eberle; Y. V. Efremenko; T. Engelmore; A. Enokizono; S. Esumi; K. O. Eyser; B. Fadem; N. Feege; D. E. Fields; M. Finger; M. FingerJr.; F. Fleuret; S. L. Fokin; J. E. Frantz; A. Franz; A. D. Frawley; Y. Fukao; T. Fusayasu; K. Gainey; C. Gal; P. Gallus; P. Garg; A. Garishvili; I. Garishvili; F. Gastaldi; H. Ge; P. Giannotti; F. Giordarno; A. Glenn; X. Gong; M. Gonin; Y. Goto; R. Granier de Cassagnac; N. Grau; S. V. Greene; M. Grosse Perdekamp; Y. Gu; T. Gunji; H. Guragain; T. Hachiya; J. S. Haggerty; K. I. Hahn; H. Hamagaki; H. F. Hamilton; S. Y. Han; J. Hanks; S. Hasegawa; T. O. S. Haseler; K. Hashimoto; R. Hayano; S. Hayashi; X. He; T. K. Hemmick; T. Hester; J. C. Hill; M. Hoefferkamp; R. S. Hollis; K. Homma; B. Hong; Y. Hori; T. Hoshino; J. Huang; S. Huang; J. R. Hutchins; T. Ichihara; Y. Ikeda; K. Imai; Y. Imazu; J. Imrek; M. Inaba; A. Iordanova; D. Isenhower; A. Isinhue; A. Isupov; D. Ivanischev; V. Ivanov; B. V. Jacak; S. J. Jeon; M. Jezghani; J. Jia; X. Jiang; B. M. Johnson; K. S. Joo; D. Jouan; D. S. Jumper; J. Kamin; S. Kanda; B. H. Kang; J. H. Kang; J. S. Kang; J. Kapustinsky; K. Karatsu; D. Kawall; A. V. Kazantsev; H. -J. Kehayias; J. A. Key; V. Khachatryan; P. K. Khandai; A. Khanzadeev; K. M. Kijima; C. Kim; D. H. Kim; D. J. Kim; E. -J. Kim; H. J. Kim; K. -B. Kim; M. Kim; Y. -J. Kim; Y. K. Kim; B. Kimelman; Á. Kiss; E. Kistenev; R. Kitamura; J. Klatsky; D. Kleinjan; P. Kline; T. Koblesky; L. Kochenda; M. Kofarago; Y. Komatsu; B. Komkov; J. Koster; D. Kotchetkov; D. Kotov; P. Kravtsov; F. Krizek; K. Kurita; M. Kuriyama; M. Kurosawa; Y. Kwon; R. Lacey; Y. S. Lai; J. G. Lajoie; A. Lebedev; G. H. Lee; J. Lee; K. B. Lee; K. S. Lee; S. Lee; S. H. Lee; R. Lefferts; M. J. Leitch; M. A. L. Leite; M. Leitgab; B. Lewis; X. Li; S. H. Lim; A. Lipski; A. Litvinenko; M. X. Liu; B. Love; D. Lynch; M. Lynch; C. F. Maguire; Y. I. Makdisi; M. Makek; A. Malakhov; A. Manion; V. I. Manko; E. Mannel; T. Maruyama; S. Masumoto; M. McCumber; P. L. McGaughey; D. McGlinchey; R. McKay; C. McKinney; A. Meles; M. Mendoza; R. Menegasso; B. Meredith; Y. Miake; T. Mibe; A. C. Mignerey; A. Milov; D. K. Mishra; J. T. Mitchell; S. Miyasaka; S. Mizuno; A. K. Mohanty; P. Montuenga; T. Moon; D. P. Morrison; M. Moskowitz; S. Motschwiller; T. V. Moukhanova; T. Murakami; J. Murata; A. Mwai; T. Nagae; S. Nagamiya; K. Nagashima; J. L. Nagle; M. I. Nagy; I. Nakagawa; H. Nakagomi; Y. Nakamiya; K. R. Nakamura; T. Nakamura; K. Nakano; C. Nattrass; A. Nederlof; P. K. Netrakanti; M. Nihashi; T. Niida; K. Ninomiya; S. Nishimura; D. Northacker; R. Nouicer; T. Novak; N. Novitzky; A. Nukariya; A. S. Nyanin; E. O'Brien; C. A. Ogilvie; H. Oide; K. Okada; J. D. Orjuela Koop; J. D. Osborn; A. Oskarsson; L. Österman; K. Ozawa; C. Pancake; V. Pantuev; V. Papavassiliou; I. H. Park; J. S. Park; S. Park; S. K. Park; S. F. Pate; L. Patel; M. Patel; J. -C. Peng; D. Perepelitsa; G. D. N. Perera; V. Peresedov; D. Yu. Peressounko; J. Perry; R. Petti; C. Pinkenburg; R. Pinson; R. P. Pisani; J. Popule; M. L. Purschke; H. Qu; S. Radhakrishnan; J. Rak; B. J. Ramson; I. Ravinovich; K. F. Read; D. Reynolds; R. Reynolds; V. Riabov; Y. Riabov; E. Richardson; T. Rinn; N. Riveli; D. Roach; S. D. Rolnick; M. Rosati; E. Roschin; Z. Rowan; J. G. Rubin; P. Rukoyatkin; M. S. Ryu; A. Safonov; B. Sahlmueller; N. Saito; T. Sakaguchi; H. Sako; V. Samsonov; M. Sano; M. Sarsour; S. Sato; S. Sawada; B. Schaefer; B. K. Schmoll; K. Sedgwick; J. Seele; R. Seidl; Y. Sekiguchi; A. Sen; R. Seto; P. Sett; A. Sexton; E. Shafto; D. Sharma; A. Shaver; I. Shein; T. -A. Shibata; K. Shigaki; M. Shimomura; K. Shoji; P. Shukla; P. Sicho; A. Sickles; C. L. Silva; D. Silvermyr; B. K. Singh; C. P. Singh; V. Singh; F. W. Sippach; M. Skolnik; M. Snowball; S. Solano; A. Soldatov; R. A. Soltz; W. E. Sondheim; S. P. Sorensen; M. Soumya; I. V. Sourikova; P. W. Stankus

2015-01-25T23:59:59.000Z

110

Proposal to upgrade the MIPP experiment  

SciTech Connect (OSTI)

The upgraded MIPP physics results are needed for the support of NuMI projects, atmospheric cosmic ray and neutrino programs worldwide and will permit a systematic study of non-perturbative QCD interactions. The MIPP TPC is the largest contributor to the MIPP event size by far. Its readout system and electronics were designed in the 1990's and limit it to a readout rate of 60 Hz in simple events and {approx} 20 Hz in complicated events. With the readout chips designed for the ALICE collaboration at the LHC, we propose a low cost scheme of upgrading the MIPP data acquisition speed to 3000 Hz. This will also enable us to measure the medium energy numi target to be used for the NOvA/MINERvA experiments. We outline the capabilities of the upgraded MIPP detector to obtain high statistics particle production data on a number of nuclei that will help towards the understanding and simulation of hadronic showers in matter. Measurements of nitrogen cross sections will permit a better understanding of cosmic ray shower systematics in the atmosphere. In addition, we explore the possibilities of providing tagged neutral beams using the MIPP spectrometer that may be crucial for validating the Particle Flow Algorithm proposed for calorimeters for the International Linear Collider detectors. Lastly, we outline the physics potential of such a detector in understanding non-perturbative QCD processes.

Isenhower, D.; Sadler, M.; Towell, R.; Watson, S.; /Abilene Christian U.; Peterson, R.J.; /Colorado U.; Baker, W.; Carey, D.; Christian, D.; Demarteau, M.; Jensen, D.; Johnstone, C.; Meyer, H.; Raja, R.; Ronzhin, A.; Solomey, N.; Wester, W.; /Fermilab; Gutbrod, H.; Peters, K.; /Darmstadt, GSI; Feldman, G.; /Harvard U.; Torun, Y.; /IIT, Chicago; Messier, M.D.; /Indiana U. /Iowa U. /Dubna, JINR /Kent State U. /Groningen, KVI /Michigan U. /St. Petersburg, INP /Purdue U. /South Carolina U. /Virginia U. /Wisconsin U., Madison

2006-09-01T23:59:59.000Z

111

Upgrades to Monteburns, version 3.0  

SciTech Connect (OSTI)

Monteburns, a Monte Carlo burnup code which has the flexibility to model time-dependent isotopic changes for a variety of nuclear systems by linking the neutron transport code MCNP/X to a production/depletion code, has undergone several performance upgrades recently that have increased the code's capabilities. Once limited to a specific number of regions, enhancements have been implemented that afford a much greater number of burn materials, such that users will be more limited by the physical constraints of their computing environment as opposed to inherent limits built into the coding of Monteburns. In conjunction with the increase in the number of burn materials, parallel execution of a production/depletion code of choice has been implemented, such that users have the option of using CINDER90, 0RIGEN2, or the newly released version of ORIGEN. Finally, the recoverable energy per fission calculation was upgraded to include capture gamma energy deposited in all specified materials as a function of irradiation time. The sum of the prompt and delayed recoverable energies from fission was obtained as before. These upgrades were first tested on a rigorous 1/8 core model of a Pressurized Water Reactor with fresh, once- and twice-burned fuel. We can now model several orders of magnitude more materials using Monte Carlo techniques, which is a significant advance in the reactor modeling world. (authors)

Galloway, J. D.; Trellue, H. R. [Los Alamos National Laboratory, 30 Bikini Atoll Rd., Los Alamos, NM 87545-0001 (United States)

2012-07-01T23:59:59.000Z

112

Ozone generation by rock fracture: Earthquake early warning?  

SciTech Connect (OSTI)

We report the production of up to 10 ppm ozone during crushing and grinding of typical terrestrial crust rocks in air, O{sub 2} and CO{sub 2} at atmospheric pressure, but not in helium or nitrogen. Ozone is formed by exoelectrons emitted by high electric fields, resulting from charge separation during fracture. The results suggest that ground level ozone produced by rock fracture, besides its potential health hazard, can be used for early warning in earthquakes and other catastrophes, such as landslides or land shifts in excavation tunnels and underground mines.

Baragiola, Raul A.; Dukes, Catherine A.; Hedges, Dawn [Engineering Physics, University of Virginia, Charlottesville, Virginia 22904 (United States)

2011-11-14T23:59:59.000Z

113

Longevity of Emplacement Drift Ground Support Materials  

SciTech Connect (OSTI)

The purpose of this analysis is to evaluate the factors affecting the longevity of emplacement drift ground support materials and to develop a basis for the selection of materials for ground support that will function throughout the preclosure period of a potential repository at Yucca Mountain. REV 01 ICN 01 of this analysis is developed in accordance with AP-3.10Q, Analyses and Models, Revision 2, ICN 4, and prepared in accordance with the Technical Work Plan for Subsurface Design Section FY 01 Work Activities (CRWMS M&O 2001a). The objective of this analysis is to update the previous analysis (CRWMS M&O 2000a) to account for related changes in the Ground Control System Description Document (CRWMS M&O 2000b), the Monitored Geologic Repository Project Description Document, which is included in the Requirements and Criteria for Implementing a Repository Design that can be Operated Over a Range of Thermal Modes (BSC 2001), input information, and in environmental conditions, and to provide updated information on candidate ground support materials. Candidate materials for ground support are carbon steel and cement grout. Steel is mainly used for steel sets, lagging, channel, rock bolts, and wire mesh. Cement grout is only considered in the case of grouted rock bolts. Candidate materials for the emplacement drift invert are carbon steel and granular natural material. Materials are evaluated for the repository emplacement drift environment based on the updated thermal loading condition and waste package design. The analysis consists of the following tasks: (1) Identify factors affecting the longevity of ground support materials for use in emplacement drifts. (2) Review existing documents concerning the behavior of candidate ground support materials during the preclosure period. (3) Evaluate impacts of temperature and radiation effects on mechanical and thermal properties of steel. Assess corrosion potential of steel at emplacement drift environment. (4) Evaluate factors affecting longevity of cement grouts for fully grouted rock bolt system. Provide updated information on cement grout mix design for fully grouted rock bolt system. (5) Evaluate longevity of materials for the emplacement drift invert.

D.H.Tang

2001-05-30T23:59:59.000Z

114

A Superconducting Magnet Upgrade of the ATF2 Final Focus  

SciTech Connect (OSTI)

The ATF2 facility at KEK is a proving ground for linear collider technology with a well instrumented extracted beam line and Final Focus (FF). The primary ATF2 goal is to demonstrate the extreme beam demagnification and spot stability needed for a linear collider FF. But the ATF2 FF uses water cooled magnets and the ILC baseline has a superconducting (SC) FF. We plan to upgrade ATF2 and replace some of the warm FF magnets with SC FF magnets. The ATF2 SC magnets, like the ILC FF, will made via direct wind construction. ATF2 coil winding is in progress at BNL and warm magnetic measurements indicate we have achieved good field quality. Studies indicate that having ATF2 FF magnets with larger aperture and better field quality should allow reducing the ATF2 FF beta function for study of focusing regimes relevant to CLIC. The ATF2 magnet cryostat will have laser view ports for directly monitoring cold mass movement. We plan to make stability measurements at BNL and KEK to relate ATF2 FF magnet performance to that of a full length ILC QD0 R and D FF prototype under construction at BNL.

Parker B.; Anerella M.; Escallier J.; He P.; Jain A.; Marone A.; Wanderer P.; Wu K.C.; Hauviller C.; Marin E.; Tomas R.; Zimmermann F.; Bolzon B.; Jeremie A.; Kimura N.; Kubo K.; Kume T.; Kuroda S.; Okugi T.; Tauchi T.; Terunuma N.; Tomaru T.; Tsuchiya K.; Urakawa J.; Yamamoto A.; Bambabe P.; Coe P.; Urner D.; Seryi A.; Spencer C.; White G.

2010-05-23T23:59:59.000Z

115

A Superconducting Magnet Upgrade of the ATF2 Final Focus  

SciTech Connect (OSTI)

The ATF2 facility at KEK is a proving ground for linear collider technology with a well instrumented extracted beam line and Final Focus (FF). The primary ATF2 goal is to demonstrate the extreme beam demagnification and spot stability needed for a linear collider FF. But the ATF2 FF uses water cooled magnets and the ILC baseline has a superconducting (SC) FF. We plan to upgrade ATF2 and replace some of the warm FF magnets with SC FF magnets. The ATF2 SC magnets, like the ILC FF, will made via direct wind construction. ATF2 coil winding is in progress at BNL and warm magnetic measurements indicate we have achieved good field quality. Studies indicate that having ATF2 FF magnets with larger aperture and better field quality should allow reducing the ATF2 FF beta function for study of focusing regimes relevant to CLIC. The ATF2 magnet cryostat will have laser view ports for directly monitoring cold mass movement. We plan to make stability measurements at BNL and KEK to relate ATF2 FF magnet performance to that of a full length ILC QD0 R&D FF prototype under construction at BNL.

Parker, Brett; /Brookhaven; Anerella, Michael; /Brookhaven; Escallier, John; /Brookhaven; He, Ping; /Brookhaven; Jain, Animesh; /Brookhaven; Marone, Andrew; /Brookhaven; Wanderer, Peter; /Brookhaven; Wu, Kuo-Chen; /Brookhaven; Bambade, Philip; /Orsay, LAL; Bolzon, Benoit; /Annecy, LAPP; Jeremie, Andrea; /Annecy, LAPP; Coe, Paul; /Oxford U.; Urner, David /Oxford U.; Hauviller, Claude; /CERN; Marin, Eduardo; /CERN; Tomas, Rogelio; /CERN; Zimmermann, Frank; /CERN; Kimura, Nobuhiro; /KEK, Tsukuba; Kubo, Kiyoshi; /KEK, Tsukuba; Kume, Tatsuya /KEK, Tsukuba; Kuroda, Shigeru; /KEK, Tsukuba /KEK, Tsukuba /KEK, Tsukuba /KEK, Tsukuba /KEK, Tsukuba /KEK, Tsukuba /KEK, Tsukuba /KEK, Tsukuba /SLAC /SLAC /SLAC

2012-07-05T23:59:59.000Z

116

Ground magnetic survey in the Coso Range, California | Open Energy  

Open Energy Info (EERE)

Ground magnetic survey in the Coso Range, California Ground magnetic survey in the Coso Range, California Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Journal Article: Ground magnetic survey in the Coso Range, California Details Activities (1) Areas (1) Regions (0) Abstract: A ground magnetic study was completed in the Coso volcanic field to investigate faulting and associated hydrothermal alteration patterns. The magnetic intensity contours match general geologic patterns in varying rock types. Hydrothermally altered rocks along intersecting fault zones show up as strong magnetic lows that form a triangular-shaped area. This area is centered in an area of highest heat flow and is a site of concentrated fumarolic activity. In the Coso volcanic field the combination of high heat flow, fumarolic activity, magnetic lows, and hydrothermal

117

Innovative Technology Improves Upgrading Process for Unconventional Oil  

Broader source: Energy.gov (indexed) [DOE]

Innovative Technology Improves Upgrading Process for Unconventional Innovative Technology Improves Upgrading Process for Unconventional Oil Resources Innovative Technology Improves Upgrading Process for Unconventional Oil Resources April 9, 2013 - 1:57pm Addthis Washington, DC - An innovative oil-upgrading technology that can increase the economics of unconventional petroleum resources has been developed under a U.S. Department of Energy -funded project. The promising technology, developed by Ceramatec of Salt Lake City, Utah, and managed by the Office of Fossil Energy's National Energy Technology Laboratory, has been licensed to Western Hydrogen of Calgary for upgrading bitumen or heavy oil from Canada. A new company, Field Upgrading (Calgary, Alberta), has been formed dedicated to developing and commercializing the technology.

118

County Aims to Save with Upgrades | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

County Aims to Save with Upgrades County Aims to Save with Upgrades County Aims to Save with Upgrades August 5, 2010 - 6:50pm Addthis Paul Lester Communications Specialist, Office of Energy Efficiency and Renewable Energy Fulton County, Georgia is an example of how large-scale energy upgrades can save local governments millions of dollars and develop a new green workforce. A retrofit program, funded by an $814,300 Energy Efficiency and Conservation Block Grant (EECBG) through the American Recovery and Reinvestment Act, was the topic of a recent video. Under the program, more than a dozen county facilities are being upgraded with equipment such as occupancy sensors, digital thermostats and LED exit signs. County workers will also be trained on how to conduct the upgrades and keep buildings energy efficient.

119

Innovative Technology Improves Upgrading Process for Unconventional Oil  

Broader source: Energy.gov (indexed) [DOE]

Technology Improves Upgrading Process for Unconventional Technology Improves Upgrading Process for Unconventional Oil Resources Innovative Technology Improves Upgrading Process for Unconventional Oil Resources April 9, 2013 - 1:57pm Addthis Washington, DC - An innovative oil-upgrading technology that can increase the economics of unconventional petroleum resources has been developed under a U.S. Department of Energy -funded project. The promising technology, developed by Ceramatec of Salt Lake City, Utah, and managed by the Office of Fossil Energy's National Energy Technology Laboratory, has been licensed to Western Hydrogen of Calgary for upgrading bitumen or heavy oil from Canada. A new company, Field Upgrading (Calgary, Alberta), has been formed dedicated to developing and commercializing the technology. Heavy oil is crude oil that is viscous and requires thermally enhanced oil

120

Energy Efficiency Upgrades: Benefiting Homeowners and the Environment |  

Broader source: Energy.gov (indexed) [DOE]

Upgrades: Benefiting Homeowners and the Upgrades: Benefiting Homeowners and the Environment Energy Efficiency Upgrades: Benefiting Homeowners and the Environment May 10, 2013 - 4:37pm Addthis Energy efficient upgrades helped Margie Garmey save money while reducing her impact on the planet. | Photo courtesy of Margie Garmey. Energy efficient upgrades helped Margie Garmey save money while reducing her impact on the planet. | Photo courtesy of Margie Garmey. Rebecca Matulka Rebecca Matulka Digital Communications Specialist, Office of Public Affairs Looking for ways to save energy? Learn how to do a DIY home energy audit to help you identify and prioritize some energy efficiency upgrades. Check out Energy Saver for tips and advice on ways to save energy and money. When Margie Garmey and her partner bought their newly constructed two-story

Note: This page contains sample records for the topic "rock grounding upgrades" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

County Aims to Save with Upgrades | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Aims to Save with Upgrades Aims to Save with Upgrades County Aims to Save with Upgrades August 5, 2010 - 6:50pm Addthis Paul Lester Communications Specialist, Office of Energy Efficiency and Renewable Energy Fulton County, Georgia is an example of how large-scale energy upgrades can save local governments millions of dollars and develop a new green workforce. A retrofit program, funded by an $814,300 Energy Efficiency and Conservation Block Grant (EECBG) through the American Recovery and Reinvestment Act, was the topic of a recent video. Under the program, more than a dozen county facilities are being upgraded with equipment such as occupancy sensors, digital thermostats and LED exit signs. County workers will also be trained on how to conduct the upgrades and keep buildings energy efficient.

122

Rock Sampling | Open Energy Information  

Open Energy Info (EERE)

Rock Sampling Rock Sampling Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Technique: Rock Sampling Details Activities (13) Areas (13) Regions (1) NEPA(0) Exploration Technique Information Exploration Group: Field Techniques Exploration Sub Group: Field Sampling Parent Exploration Technique: Field Sampling Information Provided by Technique Lithology: Rock samples are used to define lithology. Field and lab analyses can be used to measure the chemical and isotopic constituents of rock samples. Stratigraphic/Structural: Provides information about the time and environment which formed a particular geologic unit. Microscopic rock textures can be used to estimate the history of stress and strain, and/or faulting. Hydrological: Isotope geochemistry can reveal fluid circulation of a geothermal system.

123

Methods and apparatuses for preparing upgraded pyrolysis oil  

DOE Patents [OSTI]

Methods and apparatuses for preparing upgraded pyrolysis oil are provided herein. In an embodiment, a method of preparing upgraded pyrolysis oil includes providing a biomass-derived pyrolysis oil stream having an original oxygen content. The biomass-derived pyrolysis oil stream is hydrodeoxygenated under catalysis in the presence of hydrogen to form a hydrodeoxygenated pyrolysis oil stream comprising a cyclic paraffin component. At least a portion of the hydrodeoxygenated pyrolysis oil stream is dehydrogenated under catalysis to form the upgraded pyrolysis oil.

Brandvold, Timothy A; Baird, Lance Awender; Frey, Stanley Joseph

2013-10-01T23:59:59.000Z

124

Overview - Hard Rock Penetration  

SciTech Connect (OSTI)

The Hard Rock Penetration program is developing technology to reduce the costs of drilling and completing geothermal wells. Current projects include: lost circulation control, rock penetration mechanics, instrumentation, and industry/DOE cost shared projects of the Geothermal Drilling Organization. Last year, a number of accomplishments were achieved in each of these areas. A new flow meter being developed to accurately measure drilling fluid outflow was tested extensively during Long Valley drilling. Results show that this meter is rugged, reliable, and can provide useful measurements of small differences in fluid inflow and outflow rates. By providing early indications of fluid gain or loss, improved control of blow-out and lost circulation problems during geothermal drilling can be expected. In the area of downhole tools for lost circulation control, the concept of a downhole injector for injecting a two-component, fast-setting cementitious mud was developed. DOE filed a patent application for this concept during FY 91. The design criteria for a high-temperature potassium, uranium, thorium logging tool featuring a downhole data storage computer were established, and a request for proposals was submitted to tool development companies. The fundamental theory of acoustic telemetry in drill strings was significantly advanced through field experimentation and analysis. A new understanding of energy loss mechanisms was developed.

Dunn, James C.

1992-03-24T23:59:59.000Z

125

Overview: Hard Rock Penetration  

SciTech Connect (OSTI)

The Hard Rock Penetration program is developing technology to reduce the costs of drilling and completing geothermal wells. Current projects include: lost circulation control, rock penetration mechanics, instrumentation, and industry/DOE cost shared projects of the Geothermal Drilling organization. Last year, a number of accomplishments were achieved in each of these areas. A new flow meter being developed to accurately measure drilling fluid outflow was tested extensively during Long Valley drilling. Results show that this meter is rugged, reliable, and can provide useful measurements of small differences in fluid inflow and outflow rates. By providing early indications of fluid gain or loss, improved control of blow-out and lost circulation problems during geothermal drilling can be expected. In the area of downhole tools for lost circulation control, the concept of a downhole injector for injecting a two-component, fast-setting cementitious mud was developed. DOE filed a patent application for this concept during FY 91. The design criteria for a high-temperature potassium, uranium, thorium logging tool featuring a downhole data storage computer were established, and a request for proposals was submitted to tool development companies. The fundamental theory of acoustic telemetry in drill strings was significantly advanced through field experimentation and analysis. A new understanding of energy loss mechanisms was developed.

Dunn, J.C.

1992-08-01T23:59:59.000Z

126

Rock Properties Model  

SciTech Connect (OSTI)

The purpose of this model report is to document the Rock Properties Model version 3.1 with regard to input data, model methods, assumptions, uncertainties and limitations of model results, and qualification status of the model. The report also documents the differences between the current and previous versions and validation of the model. The rock properties model provides mean matrix and lithophysae porosity, and the cross-correlated mean bulk density as direct input to the ''Saturated Zone Flow and Transport Model Abstraction'', MDL-NBS-HS-000021, REV 02 (BSC 2004 [DIRS 170042]). The constraints, caveats, and limitations associated with this model are discussed in Section 6.6 and 8.2. Model validation accomplished by corroboration with data not cited as direct input is discussed in Section 7. The revision of this model report was performed as part of activities being conducted under the ''Technical Work Plan for: The Integrated Site Model, Revision 05'' (BSC 2004 [DIRS 169635]). The purpose of this revision is to bring the report up to current procedural requirements and address the Regulatory Integration Team evaluation comments. The work plan describes the scope, objectives, tasks, methodology, and procedures for this process.

C. Lum

2004-09-16T23:59:59.000Z

127

Ground water and energy  

SciTech Connect (OSTI)

This national workshop on ground water and energy was conceived by the US Department of Energy's Office of Environmental Assessments. Generally, OEA needed to know what data are available on ground water, what information is still needed, and how DOE can best utilize what has already been learned. The workshop focussed on three areas: (1) ground water supply; (2) conflicts and barriers to ground water use; and (3) alternatives or solutions to the various issues relating to ground water. (ACR)

Not Available

1980-11-01T23:59:59.000Z

128

Breaking Ground in Miami-Dade | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Breaking Ground in Miami-Dade Breaking Ground in Miami-Dade Breaking Ground in Miami-Dade October 15, 2010 - 4:28pm Addthis Existing Miami-Dade county water treatment facility. Existing Miami-Dade county water treatment facility. Andy Oare Andy Oare Former New Media Strategist, Office of Public Affairs Officials from Miami-Dade County and the U.S. Department of Energy were on hand Wednesday, October 13th to formally break ground on an innovative project that will help improve the energy efficiency of one of the county's major water treatment facilities. The project will upgrade and expand the existing power generation system at the water plant which generates electricity from digester gas produced at the plant. Landfill gas, which is produced from the Solid Waste Department's South Dade Landfill, will be collected and piped across a

129

List of Steam-system upgrades Incentives | Open Energy Information  

Open Energy Info (EERE)

upgrades Incentives upgrades Incentives Jump to: navigation, search The following contains the list of 100 Steam-system upgrades Incentives. CSV (rows 1 - 100) Incentive Incentive Type Place Applicable Sector Eligible Technologies Active AlabamaSAVES Revolving Loan Program (Alabama) State Loan Program Alabama Commercial Industrial Institutional Building Insulation Doors Energy Mgmt. Systems/Building Controls Lighting Lighting Controls/Sensors Steam-system upgrades Water Heaters Windows Biodiesel Biomass CHP/Cogeneration Ethanol Fuel Cells using Renewable Fuels Geothermal Electric Hydroelectric energy Landfill Gas Photovoltaics Renewable Fuels Solar Water Heat Commercial Refrigeration Equipment Natural Gas Yes Ameren Missouri (Gas) - Business Energy Efficiency Program (Missouri) Utility Rebate Program Missouri Commercial

130

Employee-Focused Structure Helps Produce Upgrades for Contractor...  

Energy Savers [EERE]

Progressive Energy Solutions around three pillars: employee ownership; development of energy efficiency best practices; and superior energy upgrade work. "We all have a real...

131

Office of Energy Policy and Systems Analysis Site Upgrade  

Broader source: Energy.gov [DOE]

Office of Energy Policy and Systems Analysis site is currently being upgraded to better serve on audience. Please check back shortly.

132

EECBG Success Story: County Partners with Siemens on Energy Upgrades...  

Office of Environmental Management (EM)

Block Grant (EECBG) to develop projects including a solar photovoltaic energy system, LED lighting at municipal buildings, boiler upgrades, energy efficiency retrofits at the...

133

Community based outreach strategies in residential energy upgrade programs  

E-Print Network [OSTI]

Home energy upgrades can reduce residential energy consumption and improve indoor conditions, thereby realizing environmental, economic, health and other social benefits. Utilities, government and other actors have established ...

McEwen, Brendan (Brendan Carl Francis)

2012-01-01T23:59:59.000Z

134

Conversion Technologies for Advanced Biofuels ? Bio-Oil Upgrading  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

of bio-oils. Focus on process development activities and underlying science for biofuels production. Bio-oil Upgrading - Presenter Information Energy Efficiency & Renewable...

135

THREE VIRGINIA PROGRAMS OVERCOME BARRIERS TO UPGRADES | Department...  

Energy Savers [EERE]

upgrades. RREA used a home energy makeover contest to educate homeowners and drive demand. RREA also engaged faith-based institutions and neighborhood associations in its...

136

New Science on the Horizon as Upgraded Particle Accelerator Meets...  

Office of Science (SC) Website

New Science on the Horizon as Upgraded Particle Accelerator Meets Commissioning Milestones Nuclear Physics (NP) NP Home About Research Facilities Science Highlights Benefits of NP...

137

Jefferson Lab's upgraded Free-Electron Laser produces first ligh...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

upgraded Free-Electron Laser produces first light June 18, 2003 Researchers at the U.S. Department of Energy's Thomas Jefferson National Accelerator Facility have produced first...

138

Upgrading of Pitch Produced by Mild Gasification of Subbituminous Cal  

Science Journals Connector (OSTI)

Upgrading of Pitch Produced by Mild Gasification of Subbituminous Cal ... Structural Characterization of Coal Tar Pitches Obtained by Heat Treatment under Different Conditions ...

Robert L. McCormick; Mahesh C. Jha

1994-03-01T23:59:59.000Z

139

EA-1190: Wastewater Treatment Capability Upgrade, Amarillo, Texas  

Broader source: Energy.gov [DOE]

This EA evaluates the environmental impacts for the proposed upgrade of the U.S. Department of Energy Pantex Plant Wastewater Treatment Plant in Amarillo, Texas.

140

PHOENIX ENERGIZES LIGHT RAIL CORRIDOR WITH UPGRADES | Department...  

Energy Savers [EERE]

duct sealing; heating, ventilation, and air conditioning (HVAC) upgrades; sunscreens; and solar water heaters. Energize Phoenix eventually expanded its service area beyond the...

Note: This page contains sample records for the topic "rock grounding upgrades" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Kitchen Appliance Upgrades Improve Water Efficiency at DOD Exchange...  

Broader source: Energy.gov (indexed) [DOE]

Kitchen Appliance Upgrades Improve Water Efficiency at DOD Exchange Facilities: Best Management Practice Case Study 11: Commercial Kitchen Equipment (Brochure), Federal Energy...

142

Ribbon cutting marks chemistry laboratory upgrades at Northern...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Ribbon cutting marks chemistry laboratory upgrades at Northern New Mexico College Community Connections: Your link to news and opportunities from Los Alamos National Laboratory...

143

Bedford Energizes Other Communities to Upgrade | Department of...  

Energy Savers [EERE]

program and completed energy efficiency upgrades in their own homes, the rate of project completion was more than double the average of that across all participating...

144

Plains & Eastern Clean Line Project Proposal for New or Upgraded...  

Office of Environmental Management (EM)

Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Plains & Eastern Clean Line Project...

145

The value of steam turbine upgrades  

SciTech Connect (OSTI)

Technological advances in mechanical and aerodynamic design of the turbine steam path are resulting in higher reliability and efficiency. A recent study conducted on a 390 MW pulverized coal-fired unit revealed just how much these new technological advancements can improve efficiency and output. The empirical study showed that the turbine upgrade raised high pressure (HP) turbine efficiency by 5%, intermediate pressure (IP) turbine efficiency by 4%, and low pressure (LP) turbine efficiency by 2.5%. In addition, the unit's highest achievable gross generation increased from 360 MW to 371 MW. 3 figs.

Potter, K.; Olear, D.; [General Physics Corp. (United States)

2005-11-01T23:59:59.000Z

146

Syngas Upgrading to Hydrocarbon Fuels Technology Pathway  

Broader source: Energy.gov [DOE]

This technology pathway case investigates the upgrading of woody biomass derived synthesis gas (syngas) to hydrocarbon biofuels. While this specific discussion focuses on the conversion of syngas via a methanol intermediate to hydrocarbon blendstocks, there are a number of alternative conversion routes for production of hydrocarbons through a wide array of intermediates from syngas. Future work will also consider the variations to this pathway to determine the most economically viable and lowest risk conversion route. Technical barriers and key research needs have been identified that should be pursued for the syngas-to-hydrocarbon pathway to be competitive with petroleum-derived gasoline-, diesel- and jet-range hydrocarbon blendstocks.

147

ATLAS Tile Calorimeter Electronics and Future Upgrade  

E-Print Network [OSTI]

The Tile Calorimeter (TileCal) of the ATLAS experiment is the hadronic calorimeter designed for energy reconstruction of hadrons, jets, tau-particles and missing transverse energy. An overview of the on-detector and off-detector TileCal electronics used for ATLAS data taking is given. Upgrade plans for TileCal electronics for the High Luminosity LHC programme in 2024 are discussed, together with R&D activities at different laboratories that target different parts of the TileCal electronics. In particular, a demonstrator prototype for TileCal electronics to be installed during the long shutdown in 2014 is described.

Usai, G; The ATLAS collaboration

2014-01-01T23:59:59.000Z

148

MCNPX graphics and arithmetic tally upgrades  

SciTech Connect (OSTI)

The MCNPX MCPLOT package is the tool used to plot tallies and cross-sections. We report on an assortment of upgrades to MCPLOT that are intended to improve the appearance of two-dimensional tally and cross-section plots. We have also expanded the content and versatility of the MCPLOT 'help' command. Finally, we describe the initial phase of capability implementation to post-process tally data using arithmetic operations. These improvements will enable users to better display and manipulate simulation results.

Durkee, Joe W [Los Alamos National Laboratory; James, Michael R [Los Alamos National Laboratory; Waters, Laurie S [Los Alamos National Laboratory

2008-01-01T23:59:59.000Z

149

The enhanced ASDEX Upgrade pellet centrifuge launcher  

SciTech Connect (OSTI)

Pellets played an important role in the program of ASDEX Upgrade serving both for investigations on efficient particle fuelling and high density scenarios but also for pioneering work on Edge Localised Mode (ELM) pacing and mitigation. Initially designed for launching fuelling pellets from the magnetic low field side, the system was converted already some time ago to inject pellets from the magnetic high field side as much higher fuelling efficiency was found using this configuration. In operation for more than 20 years, the pellet launching system had to undergo a major revision and upgrading, in particular of its control system. Furthermore, the control system installed adjacent to the launcher had to be transferred to a more distant location enforcing a complete galvanic separation from torus potential and a fully remote control solution. Changing from a hybrid system consisting of PLC S5/S7 and some hard wired relay control to a state of the art PLC system allowed the introduction of several new operational options enabling more flexibility in the pellet experiments. This article describes the new system architecture of control hardware and software, the operating procedure, and the extended operational window. First successful applications for ELM pacing and triggering studies are presented as well as utilization for the development of high density scenarios.

Plöckl, B.; Lang, P. T. [Max Planck Institute for Plasma Physics, EURATOM Association, Boltzmannstr. 2, 85748 Garching (Germany)] [Max Planck Institute for Plasma Physics, EURATOM Association, Boltzmannstr. 2, 85748 Garching (Germany)

2013-10-15T23:59:59.000Z

150

ATLAS Upgrade Instrumentation in the US  

E-Print Network [OSTI]

Planned upgrades of the LHC over the next decade should allow the machine to operate at a center of mass energy of 14 TeV with instantaneous luminosities in the range 5--7e34 cm^-2 s^-1. With these parameters, ATLAS could collect 3,000 fb^-1 of data in approximately 10 years. However, the conditions under which this data would be acquired are much harsher than those currently encountered at the LHC. For example, the number of proton-proton interactions per bunch crossing will rise from the level of 20--30 per 50 ns crossing observed in 2012 to 140--200 every 25 ns. In order to deepen our understanding of the newly discovered Higgs boson and to extend our searches for physics beyond that new particle, the ATLAS detector, trigger, and readout will have to undergo significant upgrades. In this whitepaper we describe R&D necessary for ATLAS to continue to run effectively at the highest luminosities foreseen from the LHC. Emphasis is placed on those R&D efforts in which US institutions are playing a leading role.

Gustaaf Brooijmans; Hal Evans; Abe Seiden

2013-07-22T23:59:59.000Z

151

ATLAS Upgrade Instrumentation in the US  

E-Print Network [OSTI]

Planned upgrades of the LHC over the next decade should allow the machine to operate at a center of mass energy of 14 TeV with instantaneous luminosities in the range 5--7e34 cm^-2 s^-1. With these parameters, ATLAS could collect 3,000 fb^-1 of data in approximately 10 years. However, the conditions under which this data would be acquired are much harsher than those currently encountered at the LHC. For example, the number of proton-proton interactions per bunch crossing will rise from the level of 20--30 per 50 ns crossing observed in 2012 to 140--200 every 25 ns. In order to deepen our understanding of the newly discovered Higgs boson and to extend our searches for physics beyond that new particle, the ATLAS detector, trigger, and readout will have to undergo significant upgrades. In this whitepaper we describe R&D necessary for ATLAS to continue to run effectively at the highest luminosities foreseen from the LHC. Emphasis is placed on those R&D efforts in which US institutions are playing a leadin...

Brooijmans, Gustaaf; Seiden, Abe

2013-01-01T23:59:59.000Z

152

CEBAF Upgrade: Cryomodule Performance And Lessons Learned  

SciTech Connect (OSTI)

The Thomas Jefferson National Accelerator Facility is currently engaged in the 12 GeV Upgrade Project. The goal of the 12 GeV Upgrade is a doubling of the available beam energy of the Continuous Electron Beam Accelerator Facility (CEBAF) from 6 GeV to 12 GeV. This increase in beam energy will be due in large part to the addition of ten C100 cryomodules plus associated new RF in the CEBAF linacs. The C100 cryomodules are designed to deliver 100 MeV per installed cryomodule. Each C100 cryomodule is built around a string of eight seven-cell, electro-polished, superconducting RF cavities. While an average performance of 100MV per cryomodule is needed to achieve the overall 12 GeV beam energy goal, the actual performance goal for the cryomodules is an average energy gain of 108 MV to provide operational headroom. Cryomodule production started in December 2010. All ten of the C100 cryomodules are installed in the linac tunnels and are on schedule to complete commissioning by September 2013. Performance during Commissioning has ranged from 104 MV to 118 MV. In May, 2012 a test of an early C100 achieved 108 MV with full beam loading. This paper will discuss the performance of the C100 cryomodules along with operational challenges and lessons learned for future designs.

Drury, Michael A.; Davis, G. Kirk; Hogan, John P.; Hovater, J. Curt; King, Lawrence; Marhauser, Frank; Park, HyeKyoung; Preble, Joe; Reece, Charles E.; Rimmer, Robert A.; Wang, Haipeng; Wiseman, Mark A.

2014-02-01T23:59:59.000Z

153

Algal Lipid Extraction and Upgrading to Hydrocarbons Technology Pathway  

Broader source: Energy.gov [DOE]

This technology pathway case investigates the cultivation of algal biomass followed by further lipid extraction and upgrading to hydrocarbon biofuels. Technical barriers and key research needs have been assessed in order for the algal lipid extraction and upgrading pathway to be competitive with petroleum-derived gasoline-, diesel-, and jet-range hydrocarbon blendstocks.

154

Secure upgrade of hardware security modules in bank networks  

Science Journals Connector (OSTI)

We study the secure upgrade of critical components in wide networked systems, focussing on the case study of PIN processing Hardware Security Modules (HSMs). These tamper-resistant devices, used by banks to securely transmit and verify the PIN typed ... Keywords: PIN processing, hardware security modules, security APIs, upgrade strategies

Riccardo Focardi; Flaminia L. Luccio

2010-03-01T23:59:59.000Z

155

Recent ASDEX Upgrade Research in Support of ITER and DEMO  

E-Print Network [OSTI]

Energy Conference, OV2/2, St. Petersburg, Russia, 13.10.2014 · ASDEX Upgrade: machine and programme allowed (?) Virtually no disruptions #12;ASDEX Upgrade has a powerful H&CD system Neutral Beam Injection;Stagnation of core density build-up due to fuelling limit (source shifts to SOL) High SOL density leads

156

Health and Safety Plan for NSTX Upgrade Project Tasks  

E-Print Network [OSTI]

Health and Safety Plan for NSTX Upgrade Project Tasks in the NSTX Test Cell PRINCETON PLASMA....~_____...L....,L....q..l:::::.......:.J Larry Dudek, NSTX Center Stack Manager Reviewed by: I( Jer evine, Environment, Safety, Health and S This document describes the structure and implementation of the Health and Safety Plan for the NSTX Upgrade

Princeton Plasma Physics Laboratory

157

Health and Safety Plan for NSTX Upgrade Project Tasks  

E-Print Network [OSTI]

Draft 0 6/17/11 1 Health and Safety Plan for NSTX Upgrade Project Tasks in the NSTX Test Cell: _____________________________________________________________ Jerry Levine, Environment, Safety, Health and Security Head Reviewed by describes the structure and implementation of the Health and Safety Plan for the NSTX Upgrade Project work

Princeton Plasma Physics Laboratory

158

Properties of Upgraded Shengli Lignite and Its Behavior for Gasification  

Science Journals Connector (OSTI)

Low-rank coals (LRCs, i.e., brown coal and lignite) have an estimated proportion of 45% of the world’s coal reserves and constitute a significant resource for both energy and chemical feedstocks. ... (10)Figure 15 shows the calculating results of reactivity parameters (Rmax, Rave, and R) for SL lignite and different upgraded lignites obtained by isothermal upgrading. ...

Xianjun Yang; Cheng Zhang; Peng Tan; Tao Yang; Qingyan Fang; Gang Chen

2013-10-29T23:59:59.000Z

159

LHC accelerator R&D and upgrade scenarios  

Science Journals Connector (OSTI)

I report the results of a CERN task force set up to investigate a possible staged upgrade of the LHC and of its injectors, with a view...34 cm–2 s–1 to 1035 cm–2 s–1. Scenarios for an LHC energy upgrade by nearly...

F. Ruggiero

2004-07-01T23:59:59.000Z

160

Ground Vibration Measurement  

Science Journals Connector (OSTI)

Measurement of ground vibration is important for checking of amplitudes of ... confirmation of efficiency of control measures of ground vibration. The properties of measuring instruments used can affect the resul...

Dr. Milutin Srbulov

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "rock grounding upgrades" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Unique Solar Thermal Laboratory Gets an Upgrade | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Unique Solar Thermal Laboratory Gets an Upgrade Unique Solar Thermal Laboratory Gets an Upgrade Unique Solar Thermal Laboratory Gets an Upgrade September 10, 2010 - 2:54pm Addthis This “power tower” is part of the National Solar Thermal Test Facility in Albuquerque, which is getting upgrades through Recovery Act funding. | Photo Courtesy of Sandia National Laboratories This "power tower" is part of the National Solar Thermal Test Facility in Albuquerque, which is getting upgrades through Recovery Act funding. | Photo Courtesy of Sandia National Laboratories Lorelei Laird Writer, Energy Empowers The National Solar Thermal Test Facility at Sandia National Laboratories is unique - and in demand. The Facility has been instrumental in NASA tests, national defense programs and concentrated solar technology development.

162

EA-0907: Idaho National Engineering Laboratory Sewer System Upgrade  

Broader source: Energy.gov (indexed) [DOE]

7: Idaho National Engineering Laboratory Sewer System Upgrade 7: Idaho National Engineering Laboratory Sewer System Upgrade Project, Idaho Falls, Idaho EA-0907: Idaho National Engineering Laboratory Sewer System Upgrade Project, Idaho Falls, Idaho SUMMARY This EA evaluates the environmental impacts of a proposal to upgrade the Sewer System at the U.S. Department of Energy's Idaho National Engineering Laboratory (INEL) near Idaho Falls, Idaho. The proposed action would include activities conducted at the Central Facilities Area, Test Reactor Area, and the Containment Test Facility at the Test Area North at INEL. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD April 1, 1994 EA-0907: Finding of No Significant Impact Idaho National Engineering Laboratory Sewer System Upgrade Project

163

Energy Efficiency Upgrades Help Retired Military Officers Save Money |  

Broader source: Energy.gov (indexed) [DOE]

Energy Efficiency Upgrades Help Retired Military Officers Save Energy Efficiency Upgrades Help Retired Military Officers Save Money Energy Efficiency Upgrades Help Retired Military Officers Save Money May 7, 2013 - 12:50pm Addthis A retirement community in San Antonio worked with a local Better Buildings Neighborhood Program partner, CPS Energy Saver, to make energy efficiency upgrades to 189 single-family cottages. | Photo courtesy of CPS Energy. A retirement community in San Antonio worked with a local Better Buildings Neighborhood Program partner, CPS Energy Saver, to make energy efficiency upgrades to 189 single-family cottages. | Photo courtesy of CPS Energy. Rebecca Matulka Rebecca Matulka Digital Communications Specialist, Office of Public Affairs What are the key facts? A retirement community in San Antonio worked with a local Better

164

Energy Efficiency Upgrades Help Retired Military Officers Save Money |  

Broader source: Energy.gov (indexed) [DOE]

Efficiency Upgrades Help Retired Military Officers Save Efficiency Upgrades Help Retired Military Officers Save Money Energy Efficiency Upgrades Help Retired Military Officers Save Money May 7, 2013 - 12:50pm Addthis A retirement community in San Antonio worked with a local Better Buildings Neighborhood Program partner, CPS Energy Saver, to make energy efficiency upgrades to 189 single-family cottages. | Photo courtesy of CPS Energy. A retirement community in San Antonio worked with a local Better Buildings Neighborhood Program partner, CPS Energy Saver, to make energy efficiency upgrades to 189 single-family cottages. | Photo courtesy of CPS Energy. Rebecca Matulka Rebecca Matulka Digital Communications Specialist, Office of Public Affairs What are the key facts? A retirement community in San Antonio worked with a local Better

165

Energy Efficiency Upgrades Help Build Better Neighborhoods | Department of  

Broader source: Energy.gov (indexed) [DOE]

Efficiency Upgrades Help Build Better Neighborhoods Efficiency Upgrades Help Build Better Neighborhoods Energy Efficiency Upgrades Help Build Better Neighborhoods May 6, 2013 - 4:55pm Addthis In neighborhoods all across the country, the Energy Department's Better Buildings Neighborhood Program is helping families and business owners make energy efficiency upgrades that are saving them money and improving the comfort of our buildings. | Photo by Ed Hancock, NREL. In neighborhoods all across the country, the Energy Department's Better Buildings Neighborhood Program is helping families and business owners make energy efficiency upgrades that are saving them money and improving the comfort of our buildings. | Photo by Ed Hancock, NREL. Rebecca Matulka Rebecca Matulka Digital Communications Specialist, Office of Public Affairs

166

Energy Efficiency Upgrades Help Build Better Neighborhoods | Department of  

Broader source: Energy.gov (indexed) [DOE]

Energy Efficiency Upgrades Help Build Better Neighborhoods Energy Efficiency Upgrades Help Build Better Neighborhoods Energy Efficiency Upgrades Help Build Better Neighborhoods May 6, 2013 - 4:55pm Addthis In neighborhoods all across the country, the Energy Department's Better Buildings Neighborhood Program is helping families and business owners make energy efficiency upgrades that are saving them money and improving the comfort of our buildings. | Photo by Ed Hancock, NREL. In neighborhoods all across the country, the Energy Department's Better Buildings Neighborhood Program is helping families and business owners make energy efficiency upgrades that are saving them money and improving the comfort of our buildings. | Photo by Ed Hancock, NREL. Rebecca Matulka Rebecca Matulka Digital Communications Specialist, Office of Public Affairs

167

E-Print Network 3.0 - asdex upgrade edge Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Upgrade Team presented by Sibylle Gnter MPI fr Plasmaphysik, D-85748 Garching, Germany, EURATOM... collaborating institutes: 12;ASDEX Upgrade programme ... Source:...

168

E-Print Network 3.0 - asdex upgrade h-mode Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Upgrade Team presented by Sibylle Gnter MPI fr Plasmaphysik, D-85748 Garching, Germany, EURATOM... collaborating institutes: 12;ASDEX Upgrade programme ... Source:...

169

E-Print Network 3.0 - asdex upgrade team Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Upgrade Team presented by Sibylle Gnter MPI fr Plasmaphysik, D-85748 Garching, Germany, EURATOM... Overview of ASDEX Upgrade Results - Development of integrated operating...

170

EA-1951: Midway-Moxee Rebuild and Midway-Grandview Upgrade Transmissio...  

Broader source: Energy.gov (indexed) [DOE]

1: Midway-Moxee Rebuild and Midway-Grandview Upgrade Transmission Line, Benton and Yakima Counties, Washington EA-1951: Midway-Moxee Rebuild and Midway-Grandview Upgrade...

171

Sensitivity Study of Physical Limits on Ground Motion at Yucca Mountain  

E-Print Network [OSTI]

Sensitivity Study of Physical Limits on Ground Motion at Yucca Mountain by Benchun Duan and Steven at Yucca Mountain, Nevada, and assess sensitivities due to uncertainties in fault geometry, off-fault rock ground-motion parameters (e.g., Bommer, 2002; Bommer et al., 2004). The 1998 PSHA for Yucca Mountain

Duan, Benchun

172

ROCK PROPERTIES MODEL ANALYSIS MODEL REPORT  

SciTech Connect (OSTI)

The purpose of this Analysis and Model Report (AMR) is to document Rock Properties Model (RPM) 3.1 with regard to input data, model methods, assumptions, uncertainties and limitations of model results, and qualification status of the model. The report also documents the differences between the current and previous versions and validation of the model. The rock properties models are intended principally for use as input to numerical physical-process modeling, such as of ground-water flow and/or radionuclide transport. The constraints, caveats, and limitations associated with this model are discussed in the appropriate text sections that follow. This work was conducted in accordance with the following planning documents: WA-0344, ''3-D Rock Properties Modeling for FY 1998'' (SNL 1997, WA-0358), ''3-D Rock Properties Modeling for FY 1999'' (SNL 1999), and the technical development plan, Rock Properties Model Version 3.1, (CRWMS M&O 1999c). The Interim Change Notice (ICNs), ICN 02 and ICN 03, of this AMR were prepared as part of activities being conducted under the Technical Work Plan, TWP-NBS-GS-000003, ''Technical Work Plan for the Integrated Site Model, Process Model Report, Revision 01'' (CRWMS M&O 2000b). The purpose of ICN 03 is to record changes in data input status due to data qualification and verification activities. These work plans describe the scope, objectives, tasks, methodology, and implementing procedures for model construction. The constraints, caveats, and limitations associated with this model are discussed in the appropriate text sections that follow. The work scope for this activity consists of the following: (1) Conversion of the input data (laboratory measured porosity data, x-ray diffraction mineralogy, petrophysical calculations of bound water, and petrophysical calculations of porosity) for each borehole into stratigraphic coordinates; (2) Re-sampling and merging of data sets; (3) Development of geostatistical simulations of porosity; (4) Generation of derivative property models via linear coregionalization with porosity; (5) Post-processing of the simulated models to impart desired secondary geologic attributes and to create summary and uncertainty models; and (6) Conversion of the models into real-world coordinates. The conversion to real world coordinates is performed as part of the integration of the RPM into the Integrated Site Model (ISM) 3.1; this activity is not part of the current analysis. The ISM provides a consistent volumetric portrayal of the rock layers, rock properties, and mineralogy of the Yucca Mountain site and consists of three components: (1) Geologic Framework Model (GFM); (2) RPM, which is the subject of this AMR; and (3) Mineralogic Model. The interrelationship of the three components of the ISM and their interface with downstream uses are illustrated in Figure 1. Figure 2 shows the geographic boundaries of the RPM and other component models of the ISM.

Clinton Lum

2002-02-04T23:59:59.000Z

173

Life Under Rocks Grade Level: First  

E-Print Network [OSTI]

. Procedure: Find a small and large rock (rock should be on a solid surface and not sunk in sand or muck

174

Categorical Exclusion 4598: Security Upgrade Project  

Broader source: Energy.gov (indexed) [DOE]

Determination Form Determination Form Proposed Action Title: Security Upgrade Project (4598) Program or Field Office~ Y·12 Site Office LocationCs) CCjty/County/State): Oak Ridge. Anderson County, Tennessee Proposed Action Description: PAGE 04 / 04 r~:·:~~s ·'-u ~'irllO:.'~~b ., .. y " ~e ··· ., ;:;;,il ,;: ; I·;;;:;;,; ;I ,' .: :~~. ,U,Illll\;: , "':ll ,l3~ . ~~~~ 1 ~; The proposed action is to add fence posts and run razor wire in various fence locations throughout the site. This project will not require excavation. This activity will disturb gravel but will not remove gravel and soil from post holes which will be placed back in the same area. Cat.eg,orieal Exc!usion(s) ,Mp!i.cd: 81.3- Routine maintenance

175

Upgrading the TFTR Transrex Power Supplies  

SciTech Connect (OSTI)

In order to provide improved and expanded experimental capabilities, the existing Transrex power supplies at PPPL are to be upgraded and modernized. Each of the 39 power supplies consists of two six pulse silicon controlled rectifier sections forming a twelve pulse power supply. The first modification is to split each supply into two independent six pulse supplies by replacing the existing obsolete twelve pulse firing generator with two commercially available six pulse firing generators. The second change replaces the existing control link with a faster system, with greater capacity, which will allow for independent control of all 78 power supply sections. The third change replaces the existing Computer Automated Measurement and Control (CAMAC) based fault detector with an Experimental Physics and Industrial Control System (EPICS) compatible unit, eliminating the obsolete CAMAC modules. Finally the remaining relay logic and interfaces to the "Hardwired Control System" will be replaces with a Programmable Logic Controller (PLC).

J. E. Lawson, R. Marsala, S. Ramakrishnan, X. Zhao, P. Sichta

2009-05-29T23:59:59.000Z

176

LCLS LLRF Upgrades to the SLAC Linac  

SciTech Connect (OSTI)

The Linac Coherent Light Source (LCLS) at SLAC will be the brightest X-ray laser in the world when it comes on line. In order to achieve the brightness a 200fS length electron bunch is passed through an undulator. To create the 200fS, 3kA bunch, a 10pS electron bunch, created from a photo cathode in an RF gun, is run off crest on the RF to set up a position to energy correlation. The bunch is then compressed by chicanes. The stability of the RF system is critical in setting up the position to energy correlation. Specifications derived from simulations require the RF system to be stable to below 200fS in several critical injector stations and the last kilometer of linac. The SLAC linac RF system is being upgraded to meet these requirements.

Akre, R.; Dowell, D.; Emma, P.; Frisch, J.; Hong, B.; Kotturi, K.; Krejcik, P.; Wu, J.; /SLAC; Byrd, J.; /LBL, Berkeley

2007-10-04T23:59:59.000Z

177

Steam turbine upgrading: low-hanging fruit  

SciTech Connect (OSTI)

The thermodynamic performance of the steam turbine, more than any other plant component, determines overall plant efficiency. Upgrading steam path components and using computerized design tools and manufacturing techniques to minimise internal leaks are two ways to give tired steam turbines a new lease on life. The article presents three case studies that illustrate how to do that. These are at Unit 1 of Dairyland's J.P. Madgett Station in Alma, WI, a coal-fired subcritical steam plant; the four units at AmerenUE's 600 MW coal-fired Labadie plant west of St. Louis; and Unit 3 of KeyPlan Corp's Northport Power Station on Long Island. 8 figs.

Peltier, R.

2006-04-15T23:59:59.000Z

178

Shotgun cartridge rock breaker  

DOE Patents [OSTI]

A rock breaker uses shotgun cartridges or other firearm ammunition as the explosive charge at the bottom of a drilled borehole. The breaker includes a heavy steel rod or bar, a gun with a firing chamber for the ammunition which screws onto the rod, a long firing pin running through a central passage in the rod, and a firing trigger mechanism at the external end of the bar which strikes the firing pin to fire the cartridge within the borehole. A tubular sleeve surround the main body of the rod and includes slits the end to allow it to expand. The rod has a conical taper at the internal end against which the end of the sleeve expands when the sleeve is forced along the rod toward the taper by a nut threaded onto the external end of the rod. As the sleeve end expands, it pushes against the borehole and holds the explosive gasses within, and also prevents the breaker from flying out of the borehole. The trigger mechanism includes a hammer with a slot and a hole for accepting a drawbar or drawpin which, when pulled by a long cord, allows the cartridge to be fired from a remote location.

Ruzzi, Peter L. (Eagan, NM); Morrell, Roger J. (Bloomington, MN)

1995-01-01T23:59:59.000Z

179

Ground Magnetics At Coso Geothermal Area (1984) | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Ground Magnetics At Coso Geothermal Area (1984) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Magnetics At Coso Geothermal Area (1984) Exploration Activity Details Location Coso Geothermal Area Exploration Technique Ground Magnetics Activity Date 1984 Usefulness useful DOE-funding Unknown Notes The magnetic intensity contours match general geologic patterns in varying rock types. Hydrothermally altered rocks along intersecting fault zones show up as strong magnetic lows that form a triangular-shaped area. This area is centered in an area of highest heat flow and is a site of

180

MECHANICAL DEGRADATION OF EMPLACEMENT DRIFTS AT YUCCA MOUNTAIN - A CASE STUDY IN ROCK MECHANICS, PART 1: NONLITHOPHYSAL ROCK, PART 2: LITHOPHYSAL ROCK  

SciTech Connect (OSTI)

This paper outlines rock mechanics investigations associated with mechanical degradation of planned emplacement drifts at Yucca Mountain, which is the designated site for a US high-level nuclear waste repository. The factors leading to drift degradation include stresses from the overburden, stresses induced by the heat released from the emplaced waste, stresses due to seismically related ground motions, and time-dependent strength degradation. The welded tuff emplacement horizon consists of two groups of rock with distinct engineering properties: nonlithophysal units and lithophysal units, based on the relative proportion of lithophysal cavities. Part I of the paper concentrates on the generally hard, strong, and fractured nonlithophysal rock. The degradation behavior of the tunnels in the nonlithophysal rock is controlled by the occurrence of keyblocks. A statistically equivalent fracture model was generated based on extensive underground fracture mapping data from the Exploratory Studies Facility at Yucca Mountain. Three-dimensional distinct block analyses, generated with the fracture patterns randomly selected from the fracture model, were developed with the consideration of in situ, thermal, seismic loads. In this study, field data, laboratory data, and numerical analyses are well integrated to provide a solution for the unique problem of modeling drift degradation throughout the regulatory period for repository performance.

M. Lin, D. Kicker, B. Damjanac, M. Board, and M. Karakouzian

2006-02-27T23:59:59.000Z

Note: This page contains sample records for the topic "rock grounding upgrades" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Digital I and C system upgrade integration technique  

SciTech Connect (OSTI)

This work developed an integration technique for digital I and C system upgrade, the utility can replace the I and C systems step by step systematically by this method. Inst. of Nuclear Energy Research (INER) developed a digital Instrumentation and Control (I and C) replacement integration technique on the basis of requirement of the three existing nuclear power plants (NPPs), which are Chin-Shan (CS) NPP, Kuo-Sheng (KS) NPP, and Maanshan (MS) NPP, in Taiwan, and also developed the related Critical Digital Review (CDR) Procedure. The digital I and C replacement integration technique includes: (I) Establishment of Nuclear Power Plant Digital Replacement Integration Guideline, (2) Preliminary Investigation on I and C System Digitalization, (3) Evaluation on I and C System Digitalization, and (4) Establishment of I and C System Digitalization Architectures. These works can be a reference for performing I and C system digital replacement integration of the three existing NPPs of Taiwan Power Company (TPC). A CDR is the review for a critical system digital I and C replacement. The major reference of this procedure is EPRI TR- 1011710 (2005) 'Handbook for Evaluating Critical Digital Equipment and Systems' which was published by the Electric Power Research Inst. (EPRI). With this document, INER developed a TPC-specific CDR procedure. Currently, CDR becomes one of the policies for digital I and C replacement in TPC. The contents of this CDR procedure include: Scope, Responsibility, Operation Procedure, Operation Flow Chart, CDR review items. The CDR review items include the comparison of the design change, Software Verification and Validation (SVandV), Failure Mode and Effects Analysis (FMEA), Evaluation of Diversity and Defense-in-depth (D3), Evaluation of Watchdog Timer, Evaluation of Electromagnetic Compatibility (EMC), Evaluation of Grounding for System/Component, Seismic Evaluation, Witness and Inspection, Lessons Learnt from the Digital I and C Failure Events. A solid review can assure the quality of the digital I and C system replacement. (authors)

Huang, H. W. [Inst. of Nuclear Energy Research (INER), No. 1000, Wenhua Road, Chiaan Village, Longtan Township, Taoyuan County, 32546, Taiwan (China); Shih, C. [Inst. of Nuclear Engineering and Science, National Tsing Hua Univ., 101, Sec. 2, Kuang Fu Rd, Hsinchu, Taiwan (China); Wang, J. R. [Inst. of Nuclear Energy Research (INER), No. 1000, Wenhua Road, Chiaan Village, Longtan Township, Taoyuan County, 32546, Taiwan (China); Huang, K. C. [Inst. of Nuclear Engineering and Science, National Tsing Hua Univ., 101, Sec. 2, Kuang Fu Rd, Hsinchu, Taiwan (China)

2012-07-01T23:59:59.000Z

182

Post Rock | Open Energy Information  

Open Energy Info (EERE)

Rock Rock Jump to: navigation, search Name Post Rock Facility Post Rock Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Wind Capital Group Developer Wind Capital Group Energy Purchaser Westar Energy Location Ellsworth KS Coordinates 38.87269233°, -98.33059788° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.87269233,"lon":-98.33059788,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

183

Rock Density | Open Energy Information  

Open Energy Info (EERE)

form form View source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit with form History Facebook icon Twitter icon » Rock Density Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Technique: Rock Density Details Activities (2) Areas (2) Regions (0) NEPA(0) Exploration Technique Information Exploration Group: Lab Analysis Techniques Exploration Sub Group: Rock Lab Analysis Parent Exploration Technique: Rock Lab Analysis Information Provided by Technique Lithology: Density of different lithologic units. Stratigraphic/Structural: Hydrological: Thermal: Cost Information Low-End Estimate (USD): 10.001,000 centUSD 0.01 kUSD 1.0e-5 MUSD 1.0e-8 TUSD / sample

184

GEOL 103 Writing Assignment 3. Sedimentary Rocks Name _______________________  

E-Print Network [OSTI]

.g., kaolinite), halite (rock salt), gypsum, occasionally micas (muscovite, biotite). Sed rocks can also contain

Kirby, Carl S.

185

Superconducting RF Lab Facility Upgrades at Los Alamos  

SciTech Connect (OSTI)

Research and testing of multi-cell superconducting cavities demands extensive contamination control resources to achieve high-cavity fields. Facility upgrades at Los Alamos National Laboratory (LANL) included the modernization of test equipment, expanding and modernizing cleanroom facilities, improving safety, and expanding the high-pressure rinse cleaning process equipment. Each upgrade was integrated into the facility to enable users to assemble prototype cryomodules. The scope of the upgrades, the new installed capability, and budget and schedule for certain aspects of the project are discussed in this paper.

Katonak, D.J.; Rusnak, B.

1999-03-01T23:59:59.000Z

186

Upgrading of petroleum oil feedstocks using alkali metals and hydrocarbons  

DOE Patents [OSTI]

A method of upgrading an oil feedstock by removing heteroatoms and/or one or more heavy metals from the oil feedstock composition. This method reacts the oil feedstock with an alkali metal and an upgradant hydrocarbon. The alkali metal reacts with a portion of the heteroatoms and/or one or more heavy metals to form an inorganic phase separable from the organic oil feedstock material. The upgradant hydrocarbon bonds to the oil feedstock material and increases the number of carbon atoms in the product. This increase in the number of carbon atoms of the product increases the energy value of the resulting oil feedstock.

Gordon, John Howard

2014-09-09T23:59:59.000Z

187

Solid–Liquid–Vapor Equilibrium Models for Cryogenic Biogas Upgrading  

Science Journals Connector (OSTI)

In cryogenic upgrading processes involving dry ice formation, accurate predictions of solid–liquid, solid–vapor, and solid–liquid–vapor equilibria are fundamental for a correct design of the heat exchanger surface in order to achieve the desired biomethane purity. ... Moreover, the liquefied biogas production process, particularly interesting for cryogenic upgrading processes due to the low temperature of the obtained biomethane, requires an accurate knowledge of carbon dioxide solubility in liquid methane to avoid solid deposition. ... For some applications demanding a high energy content gas, namely vehicle fuels and injection in the natural gas grid, the biogas has to be upgraded into biomethane. ...

Mauro Riva; Marco Campestrini; Joseph Toubassy; Denis Clodic; Paolo Stringari

2014-10-13T23:59:59.000Z

188

Isotopic Analysis- Rock | Open Energy Information  

Open Energy Info (EERE)

Isotopic Analysis- Rock Isotopic Analysis- Rock Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Technique: Isotopic Analysis- Rock Details Activities (13) Areas (11) Regions (0) NEPA(0) Exploration Technique Information Exploration Group: Lab Analysis Techniques Exploration Sub Group: Rock Lab Analysis Parent Exploration Technique: Rock Lab Analysis Information Provided by Technique Lithology: Water rock interaction Stratigraphic/Structural: Hydrological: Thermal: Dictionary.png Isotopic Analysis- Rock: Isotopes are atoms of the same element that have different numbers of neutrons. An isotopic analysis looks at a particular isotopic element(s) in a given system, while the conditions which increase/decrease the number of neutrons are well understood and measurable.

189

Hydropower Advancement Project (HAP): Audits and Feasibility Studies for Capacity and Efficiency Upgrades  

Broader source: Energy.gov [DOE]

Hydropower Advancement Project (HAP): Audits and Feasibility Studies for Capacity and Efficiency Upgrades

190

Better Buildings: Workforce, Spotlight on Maine: Contractor Sales Training Boosts Energy Upgrade Conversions  

Broader source: Energy.gov [DOE]

Better Buildings: Workforce, Spotlight on Maine: Contractor Sales Training Boosts Energy Upgrade Conversions

191

Substation grounding optimization.  

E-Print Network [OSTI]

??Substation grounding is a critical part of the overall electric power system. It is designed to not only provide a path to dissipate electric currents… (more)

Balev, Vadim

2014-01-01T23:59:59.000Z

192

Substation grounding programs  

SciTech Connect (OSTI)

This document is a users manual and applications guide for the software package SGA. This package comprises four computer programs, namely SOMIP, SMECC, SGSYS, and TGRND. The first three programs are analysis models which are to be used in the design process of substation grounding systems. The fourth program, TGRND, is an analysis program for determining the transient response of a grounding system. This report, Volume 3, is a users manual and an installation and validation manual for the computer program SGSYS (Substation Grounding SYStem Analysis Program). This program analyzes the substation ground field given the total electric current injected into the ground field and the design of the grounding system. Standard outputs of the program are (1) total ground resistance, (2) step voltage, (3) touch voltage, (4) voltages on a grid of points, (5) voltage profile along straight lines, (6) transfer voltages, (7) ground potential rise, (8) body currents, (9) step voltage profile along straight lines, and (10) touch voltage profile along straight lines. This program can be utilized in an interactive or batch mode. In the interactive mode, the user defines the grounding system geometry, soil parameters, and output requests interactively, with the use of a user friendly conversational program. The users manual describes data requirements and data preparation procedures. An appendix provides forms which facilitate data collection procedures. The installation and validation manual describes the computer files which make up the program SGSYS and provides a test case for validation purposes.

Meliopoulos, A.P.S. (Georgia Inst. of Tech., Atlanta, GA (United States). Electric Power Lab.)

1992-05-01T23:59:59.000Z

193

Find Financing for Energy Efficiency Upgrades | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Find Financing for Energy Efficiency Upgrades Find Financing for Energy Efficiency Upgrades Find Financing for Energy Efficiency Upgrades Photo of a block in lower downtown Denver that is part of Living City Block, a DOE Commercial Building Partnerships participant. Financing need not be a barrier to improving energy efficiency in your commercial building. There are federal, state, and local and tax incentives for energy efficiency upgrades, and other financial opportunities to help you meet your energy goals. The U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy, for example, offers financial assistance opportunities to business, industry, universities, and others for the development and demonstration of energy efficiency strategies and technologies. Other methods of financing energy efficiency improvements

194

SRS upgrades helium recovery system | National Nuclear Security  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

upgrades helium recovery system | National Nuclear Security upgrades helium recovery system | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > SRS upgrades helium recovery system SRS upgrades helium recovery system Posted By Office of Public Affairs Savannah River Site (SRS) Tritium Programs recently completed a project to design, build and relocate a new system for separating and capturing

195

Federal Finance Facilities Available for Energy Efficiency Upgrades and  

Broader source: Energy.gov (indexed) [DOE]

Federal Finance Facilities Available for Energy Efficiency Upgrades Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment "Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment" is a resource guide that lists the various federal financing programs for which energy efficiency and clean energy qualify - meant to make it easier for state, local and tribal leaders, along with their partners in the private sector, to find capital for energy efficiency and clean energy projects. This first-edition guide is a product of a cooperative effort among seven federal agencies, including the U.S. Departments of Agriculture, Energy, Housing and Urban Development, Transportation and Treasury, along with the

196

Federal Finance Facilities Available for Energy Efficiency Upgrades and  

Broader source: Energy.gov (indexed) [DOE]

Federal Finance Facilities Available for Energy Efficiency Upgrades Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment "Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment" is a resource guide that lists the various federal financing programs for which energy efficiency and clean energy qualify - meant to make it easier for state, local and tribal leaders, along with their partners in the private sector, to find capital for energy efficiency and clean energy projects. This first-edition guide is a product of a cooperative effort among seven federal agencies, including the U.S. Departments of Agriculture, Energy, Housing and Urban Development, Transportation and Treasury, along with the

197

Case Study - Energy Efficiency Upgrades for Fermilab Infrastructure |  

Broader source: Energy.gov (indexed) [DOE]

Case Study - Energy Efficiency Upgrades for Fermilab Case Study - Energy Efficiency Upgrades for Fermilab Infrastructure Case Study - Energy Efficiency Upgrades for Fermilab Infrastructure October 7, 2013 - 3:29pm Addthis Utility energy service contracting provides needed plant improvements. Photo of Project Coordinator Steve Krstulovich with Fermilab's new 1400-ton, high-efficiency chiller. Project Coordinator Steve Krstulovich with Fermilab's new 1400-ton, high-efficiency chiller. Overview The U.S. Department of Energy's (DOE's) Fermi National Accelerator Laboratory (Fermilab) has replaced old equipment and reduced energy consumption through a partnership with its electric utility, Commonwealth Edison. Fermilab upgraded the centralized cooling system and separated the system into two segments - a "comfort system" to cool the employee office

198

Energy Efficiency Upgrades Part of Winning Formula for Oregon School  

Broader source: Energy.gov (indexed) [DOE]

Upgrades Part of Winning Formula for Oregon Upgrades Part of Winning Formula for Oregon School District Energy Efficiency Upgrades Part of Winning Formula for Oregon School District August 27, 2012 - 9:45am Addthis The community of Vernonia, OR, celebrates the opening of a new energy efficient school. | Photo courtesy of April Baer, OPB. The community of Vernonia, OR, celebrates the opening of a new energy efficient school. | Photo courtesy of April Baer, OPB. Todd G. Allen Project Officer, Golden Field Office What are the key facts? Energy efficiency upgrades will reduce the Vernonia school district's energy usage by 43 percent and save taxpayers more than $62,000 a year. The school will also serve as a laboratory for forest technologies

199

EA-1937: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, Crook,  

Broader source: Energy.gov (indexed) [DOE]

37: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, 37: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, Crook, Deschutes, and Wasco Co, OR EA-1937: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, Crook, Deschutes, and Wasco Co, OR SUMMARY This project would replace aging equipment at BPA's Celilo converter station and to upgrade equipment on the Celilo-Sylmar 500-kilovolt (kV) transmission line from the Celilo converter station in The Dalles, Oregon to the Nevada-Oregon border. As part of the project, BPA would remove and salvage the converter terminals 1 and 2 at its Celilo converter station and install a new two-converter terminal. A 20-acre expansion of the existing substation would accommodate the new terminal equipment. About 265 miles of transmission towers on the Celilo-Sylmar 500-kV transmission line would be

200

NERSC's Franklin Supercomputer Upgraded to Double Its Scientific Capability  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NERSC's Franklin NERSC's Franklin Supercomputer Upgraded to Double Its Scientific Capability NERSC's Franklin Supercomputer Upgraded to Double Its Scientific Capability July 20, 2009 OCEAN EDDIES: This image comes from a computer simulation modeling eddies in the ocean. An interesting feature is the abundance of eddies away from the equator, which is shown in the center of the image at y=0. This research collaboration led by Paola Cessi of the Scripps Institute of Oceanography performed over 15,000 years worth of deep ocean circulation simulations with 1.6 million processor core hours on the upgraded Franklin system. The Department of Energy's (DOE) National Energy Research Scientific Computing (NERSC) Center has officially accepted a series of upgrades to its Cray XT4 supercomputer, providing the facility's 3,000 users with twice

Note: This page contains sample records for the topic "rock grounding upgrades" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Lowell, Massachusetts, Preserves Historic Home Through Energy Upgrades  

Broader source: Energy.gov [DOE]

Artist James MacNeil Whistler's birthplace home in Lowell, Massachusetts, was built in 1823 and now houses the Lowell Art Association. The house was in need of a series of upgrades that improved energy efficiency while catering to the specific needs of a historic home and museum. Through the BetterBuildings Lowell Energy Upgrade program, the historic house will receive upgrades that include a high-velocity, small-duct HVAC system, updated storm windows, and attic insulation. These upgrades will reduce humidity in order to preserve the artwork displayed, and catch up to modern electrical demand without sacrificing the home's historic characteristics—all while providing energy savings of more than 30%. To learn more about how the project was financed and further details on the innovative HVAC equipment, read the original post from Lowell's Office of the Mayor's blog.

202

Bioenergy Technologies Office R&D Pathways: Algal Lipid Upgrading  

Broader source: Energy.gov [DOE]

Algal lipid upgrading is one of eight priority pathways chosen to convert biomass into hydrocarbon fuels by the Bioenergy Technologies Office. These pathways were down-selected from an initial list of 18.

203

Financing Energy Upgrades for K-12 School Districts  

Broader source: Energy.gov [DOE]

U.S. Department of Energy (DOE) Technical Assistance Program (TAP) presentation at a TAP webinar held on April 11, 2013 and dealing with how to finance energy efficiency upgrades for K-12 school districts.

204

CHICAGO HOUSE PARTIES SHOW WAYS TO UPGRADE | Department of Energy  

Energy Savers [EERE]

created Energy Impact Illinois (EI2) to promote home energy upgrades in single-family homes, multifamily housing units, and commercial buildings to help the region meet its 2008...

205

EECBG Success Story: Michigan County's Energy Upgrades Back on...  

Broader source: Energy.gov (indexed) [DOE]

the 'middle of the mitten,' is using over 300,000 in Recovery Act funds to perform ene Michigan County's Energy Upgrades Back on Track EECBG Success Story: The Jury's In:...

206

Office of Science Approves Critical Decision 1 for APS Upgrade...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2008 | 2007 | 2006 | 2005 2004 | 2003 | 2002 | 2001 2000 Subscribe to APS News rss feed Office of Science Approves Critical Decision 1 for APS Upgrade Project SEPTEMBER 15, 2011...

207

Financing; A Cost Effective Alternative When Upgrading Energy Efficient Systems  

E-Print Network [OSTI]

in order to effectively compete in the marketplace. One obvious method of reducing costs and improving productivity is to upgrade old, antiquated equipment such as lighting to more modern energy efficient systems. Most projects provide a return...

Ertle, J. M.

208

Energy Upgrade California Drives Demand From Behind the Wheel  

Broader source: Energy.gov [DOE]

With a goal of "energy efficiency or bust," the California Center for Sustainable Energy (CCSE) recently completed a statewide tour of its ongoing Energy Upgrade California Roadshow. The mobile...

209

Capturing Energy Efficiency Upgrades in the Real Estate Transaction  

Broader source: Energy.gov [DOE]

"Capturing Energy Efficiency Upgrades in the Real Estate Transaction," by Residential Energy Efficiency Solutions, July 10, 2012. Describes the concept of a residential MPG number as a simple way of describing a home’s energy consumption.

210

Idaho: Nez Perce Tribe Energy-Efficient Facilities Upgrade |...  

Office of Environmental Management (EM)

adding insulation and motion sensors. As a result of the upgrades, the Tribe's electrical energy consumption is estimated to be reduced by 30%, thereby reducing the cost to operate...

211

BEST OFFER EVER ACCELERATED TEXAS UPGRADES | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

of Reported Data Data Dashboard Stories & Case Studies "Homeowners Go Deeper in the Heart of Texas and Save With Austin Energy" Best Offer Ever Produces Upgrades in Record Time...

212

Kitchen Appliance Upgrades Improve Water Efficiency at DOD Exchange Facilities  

Broader source: Energy.gov [DOE]

Case study details the Exchange (formerly the Army and Air Force Exchange Service), which took a leadership role in kitchen appliance upgrades to improve water efficiency by integrating water efficiency concepts into the organization's overall sustainability plan and objectives.

213

J.R. Simplot: Burner Upgrade Project Improves Performance and...  

Broader source: Energy.gov (indexed) [DOE]

Company saved energy and money by increasing the efficiency of the steam system in its potato processing plant in Caldwell, Idaho. J.R. Simplot: Burner Upgrade Project Improves...

214

EECBG Success Story: Energy Upgrades to Save Small Arizona Town...  

Broader source: Energy.gov (indexed) [DOE]

Related Articles An aerial shot of Oro Valley, Ariz.'s town hall campus shows proposed solar locations. | Photo courtesy of Oro Valley Energy Upgrades to Save Small Arizona Town...

215

Screening of processing and upgrading schemes  

SciTech Connect (OSTI)

The RFP was predicated on DOE's desire to enhance the development of advanced transportation fuels made from coal via a program to process mild coal gasification (MCG) liquids into high volumetric energy density (HEDF) test fuels. The desired product fuels were to be cost effectively manufactured, have high volumetric energy density, and be hydrocarbon-based for existing and prototype turbine and diesel engines. The sources for these special fuels consist of the abundant and secure indigenous energy resources of coal. Comparison studies were also to be made using other non-petroleum fossil fuels such as shale oil and tar sands bitumen. METC has concluded that MCG technology has the potential to simultaneously satisfy the transportation and power generation fuel needs in the most cost-effective manner. MCG is based on low temperature pyrolysis, a technique known to the coal community for over a century. Most past pyrolysis developments were aimed at maximizing the liquids yield which results in a low quality tarry product requiring significant and capital intensive upgrading. By properly tailoring the pyrolysis severity to control the liquid yield-liquid quality relationship, it has been found that a higher quality distillate-boiling liquid can be readily skimmed'' from the coal. The resultant liquids have a much higher H/C ratio than conventional pyrolytic tars and therefore can be hydroprocessed at lower cost. These liquids are also extremely enriched in 1-, 2-, and 3-ring aromatics.

Not Available

1991-10-01T23:59:59.000Z

216

Optical Link ASICs for the LHC Upgrade  

E-Print Network [OSTI]

We have designed three ASICs for possible applications in the optical links of a new layer of pixel detector in the ATLAS experiment for the first phase of the LHC luminosity upgrade. The ASICs include a high-speed driver for the VCSEL, a receiver/decoder to decode the signal received at the PIN diode to extract the data and clock, and a clock multiplier to produce a higher frequency clock to serialize the data for transmission. These ASICs were designed using a 130 nm CMOS process to enhance the radiation-hardness. We have characterized the fabricated ASICs and the submission has been mostly successful. We irradiated the ASICs with 24 GeV/c protons at CERN to a dosage of 70 Mrad. We observed no significant degradation except the driver circuit in the VCSEL driver fabricated using the thick oxide process in order to provide sufficient voltage to drive a VCSEL. The degradation is due to a large threshold shifts in the PMOS transistors used.

K. K. Gan; H. P. Kagan; R. D. Kass; J. R. Moore; D. S. Smith

2009-11-23T23:59:59.000Z

217

Recent BES results and the BESIII upgrade  

E-Print Network [OSTI]

Using 58 million $J/\\psi$ and 14 million $\\psi(2S)$ events collected by the BESII detector at the BEPC, branching fractions or upper limits for the decays $J/\\psi$ and $\\psi(2S) \\to \\Lambda \\bar{\\Lambda} \\pi^0$ and $\\Lambda \\bar{\\Lambda} \\eta$ are measured, and the decays of $J/\\psi$ and $\\psi(2S)$ to $n K^0_S \\bar{\\Lambda}+c.c.$ are observed and measured for the first time. Finally, $R$ measurement data taken with the BESII detector at center-of-mass energies between 3.7 and 5.0 GeV are fitted to determine resonance parameters of the high mass charmonium states, $\\psi(3770)$, $\\psi(4040)$, $\\psi(4160)$, and $\\psi(4415)$. The Beijing Electron Collider is being upgraded to a two-ring collider (BEPCII) with a design luminosity of $1 \\times 10^{33}$cm$^{-2}$ s$^{-1}$ at 3.89 GeV and will operate between 2 and 4.2 GeV in the center of mass. With this luminosity, the new BESIII detector will beable to collect, for example, 10 billion $J/\\psi$ events in one year of running. BEPCII and BESIII are currently nearing completion, and commissioning of both is expected to begin in mid-2008.

Frederick A. Harris

2007-12-17T23:59:59.000Z

218

Status of the SPIRAL I upgrade at GANIL  

SciTech Connect (OSTI)

The upgrade of the ''Systeme de Production d'Ions Radioactifs en Ligne'' phase I (SPIRAL I) installed at the ''Grand Accelerateur National d'Ions Lourds'' (GANIL) situated at Caen, France, is in progress and should be ready by 2014. In parallel, the first part of SPIRAL II facility is currently under construction. The global status of the upgrade is presented: goal, radioactive ion production systems, modification of the production cave and impact of the current safety re-evaluation of GANIL.

Jardin, P.; Bajeat, O.; Delahaye, P.; Dubois, M.; Feierstein, C.; Pellemoine, F.; Lecomte, P.; Leherissier, P.; Maunoury, L.; Saint-Laurent, M. G.; Traykov, E. [GANIL, Grand Accelerateur National d'Ions Lourds, CEA-DSM/CNRS-IN2P3, Blvd. H. Becquerel, BP 55027 14076 Caen Cedex 5 (France); Couratin, C. [LPC, Laboratoire de Physique Corpusculaire, CNRS-IN2P3/Universite de Caen Basse-Normandie/ENSICaen, Blvd. Marechal Juin, 14050 Caen Cedex (France)

2012-02-15T23:59:59.000Z

219

Substation grounding programs  

SciTech Connect (OSTI)

This document is a users manual and applications guide for the software package SGA. This package comprises four computer programs, namely SOMIP, SMECC, SGSYS, and TGRND. The first three programs are analysis models which are to be used in the design process of substation grounding systems. The fourth program, TGRND, is an analysis program for determining the transient response of a grounding system. It can be used to compute transient ground potential rise due to lightning or switching, and the ground impedance (i.e. resistance and reactance) at specified frequencies. This report, Volume 4, is a users manual and an installation and validation manual for the computer program TGRND (Transient GRouNDing System Analysis Program). This program computes transient ground potential rise resulting from lightning, switching, or other transient electric currents injected to a grounding system. The program also computes the impedance (i.e. resistance and reactance) of a grounding system as a function of frequency. This program can be utilized in an interactive or batch mode. The users manual describes data requirements and data preparation procedures. The installation and validation manual describes the computer files which make up the program TGRND and provides a test case for validation purposes.

Meliopoulos, A.P.S. (Georgia Inst. of Tech., Atlanta, GA (United States). Electric Power Lab.)

1992-05-01T23:59:59.000Z

220

Microsoft Word - CX-Hat_Rock_Switch_14June2013  

Broader source: Energy.gov (indexed) [DOE]

7, 2013 7, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Glenn Russell Project Manager -TPCV-TPP-4 Proposed Action: Hat Rock Switching Station Replacement Project Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions and modifications to transmission facilities Location: Umatilla County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to fund PacifiCorp's rebuild of BPA's Hat Rock Tap Switching Station, which is located within PacifiCorp's McNary-Wallula 230-kilovolt (kV) transmission line right-of-way (ROW). Rebuilding the switching station would include the replacement of sectionalizing switches, the grounding grid, and all signage. The approximately 0.5-acre yard would

Note: This page contains sample records for the topic "rock grounding upgrades" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Ground Motion Workshop  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2nd Advanced ICFA Beam Dynamics Workshop 2nd Advanced ICFA Beam Dynamics Workshop on Ground Motion in Future Accelerators November 6 - 9, 2000 SLAC Coordinators: Andrei Seryi & Tor Raubenheimer Proceedings Updated June 26, 2001 Agenda and Presentations Workshop photos Summaries Useful links Poster Goals Introduction to the problems Structure Registration Registered participants Committees Location, Accommodations and Travel Workshop on Ground Motion in Future Accelerators A workshop was held at SLAC that was devoted to ground motion and its effects on future accelerators. Ground motion and vibration can be a limiting effect in synchrotron light sources, hadron circular colliders, and electron/positron linear colliders. Over the last several years, there has been significant progress in the understanding of the ground motion and its effects, however, there are

222

Upgrade, Parker Annex, La Paz County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

for Bouse Substation Expansion and Upgrade, Parker Annex, La Paz County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western has requested that APS relocate an existing 69kV transmission line. This will consist of replacing existing conductor and 69-kV Gang Operated Switch and installing 6 new steel monopole structures, an above ground primary meter and underground cable from the 3 phase transition. The project is located in La Paz County, Arizona. The legal description is Section 27 & 34 Township 8 North, Range 19 West on the Gila and Salt River Baseline and Meridian (USGS Black Peak & Bouse NW, AZ 7.5' maps). Western owns the land. This work is planned to begin the month of September 2011 and be completed by

223

Web System Upgrading with Transaction Failure and Strategic This paper considers pricing and web system upgrading problems for an online retailer  

E-Print Network [OSTI]

1 Web System Upgrading with Transaction Failure and Strategic Customers Abstract: This paper considers pricing and web system upgrading problems for an online retailer facing a group of strategic period and identify the optimal policy for web system upgrading: there exists a threshold for each period

Xie, Jinxing

224

Rock Lab Analysis | Open Energy Information  

Open Energy Info (EERE)

Rock Lab Analysis Rock Lab Analysis Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Technique: Rock Lab Analysis Details Activities (0) Areas (0) Regions (0) NEPA(0) Exploration Technique Information Exploration Group: Lab Analysis Techniques Exploration Sub Group: Rock Lab Analysis Parent Exploration Technique: Lab Analysis Techniques Information Provided by Technique Lithology: Core and cuttings analysis is done to define lithology. Water rock interaction. Can determine detailed information about rock composition and morphology. Density of different lithologic units. Rapid and unambiguous identification of unknown minerals.[1] Stratigraphic/Structural: Core analysis can locate faults or fracture networks. Oriented core can give additional important information on anisotropy. Historic structure and deformation of land.

225

Sulfur oxidation influence on rock phosphate solubilization in soil  

E-Print Network [OSTI]

The desirability of using rock phosphate (RP) as a phosphorus (P ) fertilizer in Brazil, as well in other parts of the world, has increased in recent years. This is due to increased prices of the energy required to transform ground RP into more soluble sources... of S on the solubilization of RP, 13X greater residual phosphorus availability when S was added to RP. Bromfield (1975) found that S mixed wi th togolese RP increased yield and that this mixture was as good as superphosphate for groundnuts. The use of elemental...

Correa de Souza, Osni

2012-06-07T23:59:59.000Z

226

PARKER-HEADGATE ROCK & PARKER-GILA  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

PARKER-HEADGATE ROCK & PARKER-GILA 161-kV TRANSMISSION LINE Cross Arm Repair and Helicopter Staging Areas Figure 1. Project Location Project Location j PARKER-HEADGATE ROCK &...

227

Substation grounding programs  

SciTech Connect (OSTI)

This document is a users manual and applications guide for the software package SGA. This package comprises four computer programs, namely SOMIP, SMECC, SGSYS, and TGRND. The first three programs are analysis models which are to be used in the design process of substation grounding systems. The fourth program, TGRND, is an analysis program for determining the transient response of a grounding system. This report, Volume 2, is a users manual and an installation and validation manual for the computer program SMECC (Substation Maximum Earth Current Computation Program). This program analyzes the electric current distribution among grounded structures inside and outside a substation for different fault conditions. The fault conditions are automatically selected by the program, or they may be specified by the user, or both. The fault condition resulting in maximum substation earth current is identified and reported. Data requirements for this program are: ground impedance, transformer data, transmission line data, transmission line grounding impedances, etc. The program provides four types of standard outputs: (1) a report of voltages and current flow in the unfaulted system, (2) a brief report of the maximum ground potential rise (worst fault condition), (3) a summary report of all fault conditions which have been analyzed by the program, and (4) a detailed report of voltages and current flow for a selected set of fault conditions.

Meliopoulos, A.P.S. (Georgia Inst. of Tech., Atlanta, GA (United States). Electric Power Lab.)

1992-05-01T23:59:59.000Z

228

Idaho Power - Easy Upgrades for Simple Retrofits Rebate Program |  

Broader source: Energy.gov (indexed) [DOE]

Idaho Power - Easy Upgrades for Simple Retrofits Rebate Program Idaho Power - Easy Upgrades for Simple Retrofits Rebate Program Idaho Power - Easy Upgrades for Simple Retrofits Rebate Program < Back Eligibility Commercial Industrial Savings Category Home Weatherization Commercial Weatherization Heating & Cooling Commercial Heating & Cooling Cooling Appliances & Electronics Construction Design & Remodeling Manufacturing Sealing Your Home Windows, Doors, & Skylights Ventilation Heat Pumps Commercial Lighting Lighting Insulation Maximum Rebate Up to 100,000 per site per year. Program Info Funding Source Conservation Program Funding Charge State Oregon Program Type Utility Rebate Program Rebate Amount A/C or Heat Pumps: $25-$100/ton Economizer Control Addition: $75/ton Air-Side Economizer Repair: $250 Evaporative Coolers: $100-$300/ton

229

Forsyth County Slashes Energy Bills with Upgrades | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Forsyth County Slashes Energy Bills with Upgrades Forsyth County Slashes Energy Bills with Upgrades Forsyth County Slashes Energy Bills with Upgrades September 30, 2010 - 12:04pm Addthis A new energy management system in Forsyth County’s 52,057 square foot courthouse is expected to save about $9,000 annually. | Photo courtesy of Forsyth County A new energy management system in Forsyth County's 52,057 square foot courthouse is expected to save about $9,000 annually. | Photo courtesy of Forsyth County Maya Payne Smart Former Writer for Energy Empowers, EERE What are the key facts? Four large projects funded through Recovery Act grant Energy efficient retrofits to save county about $72,000 annually Forsyth County, Georgia has been among the nation's fastest growing counties for the past ten years. Given the growth, officials are working

230

County Partners with Siemens on Energy Upgrades | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Partners with Siemens on Energy Upgrades Partners with Siemens on Energy Upgrades County Partners with Siemens on Energy Upgrades July 9, 2010 - 11:11am Addthis What does this project do? Allows McHenry County to install cutting edge technology to reduce our energy costs. When you're really committed to energy efficiency and looking at $118,000 in potential energy savings annually, you want to share it. That's the view in McHenry County, Ill., which partnered with Siemens Building Technologies to launch mchenrycounty-eecbg.net to let residents understand the connection between recent energy efficiency projects and C02 emissions. The county, located outside the Chicago metropolitan area, was awarded $2,475,900 in Energy Efficiency and Conservation Block Grant (EECBG) funds through the Recovery Act in November. Through the Recovery Act-funded

231

Tax Incentives for Energy Efficiency Upgrades in Commercial Buildings |  

Broader source: Energy.gov (indexed) [DOE]

Energy Efficiency Upgrades in Commercial Energy Efficiency Upgrades in Commercial Buildings Tax Incentives for Energy Efficiency Upgrades in Commercial Buildings On this page you'll find information about the tax deductions available for improving the energy efficiency of commercial buildings, as well as links to qualified software available for calculating these savings. The Energy Policy Act of 2005 (EPACT) offered businesses tax deductions for the costs of improving the energy efficiency of commercial buildings. The Emergency Economic Stabilization Act of 2008 extended provisions in EPACT. The following tax incentives are available under this act. Deduction of the Cost of Energy-Efficient Property Installed in Commercial Buildings Make quick calculations of the estimated energy cost savings from

232

Non-Profit Brighter After Upgrade | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Non-Profit Brighter After Upgrade Non-Profit Brighter After Upgrade Non-Profit Brighter After Upgrade September 21, 2010 - 11:09am Addthis Loretta Prencipe Senior Communications Analyst, Office of Energy Efficiency & Renewable Energy In the Spring of 2010, the Arizona State Energy Program awarded Recovery Act funds to 14 non-profit organizations throughout the state for energy projects. One of the recipients, St. Vincent de Paul, is a human services organization that assists people in need throughout Central and Northern Arizona. The nonprofit partnered with Glendale, Arizona-based Natural Lighting Company to install skylights at the facility. In the above video, find out how this project is helping both the nonprofit and the local company. The video was created by Jim Arwood, an independent producer and former

233

Cool Roofs: An Easy Upgrade | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Cool Roofs: An Easy Upgrade Cool Roofs: An Easy Upgrade Cool Roofs: An Easy Upgrade December 14, 2010 - 9:25am Addthis Cathy Zoi Former Assistant Secretary, Office of Energy Efficiency & Renewable Energy What does this mean for me? Dark roofs can be 50 degrees hotter than light roofs. Combined with dark roads and parking lots, dark roofs lead to the 'urban heat island' effect: cities tend to be 2-5 degrees hotter. A cooler roof means energy bills that are up to 10-15% lower because your air conditioner doesn't have to work as hard. Check out Google Earth - the 'view from above' of your favorite American city. And look at the roofs of the office buildings, warehouses, shopping centers, and even the homes. Most of them are probably pretty dark in color - and this means they heat up a lot when the weather is warm -

234

When Energy Efficiency Upgrades and Ghost Stories Meet | Department of  

Broader source: Energy.gov (indexed) [DOE]

When Energy Efficiency Upgrades and Ghost Stories Meet When Energy Efficiency Upgrades and Ghost Stories Meet When Energy Efficiency Upgrades and Ghost Stories Meet October 31, 2011 - 5:21pm Addthis Homewood Public Library at Night | Photo Courtesy of Homewood Public Library Homewood Public Library at Night | Photo Courtesy of Homewood Public Library Tertia Speiser Project Officer, Golden Field Office What are the key facts? New heating and cooling equipment has saved the Homewood Public Library thousands of dollars a year. It hasn't done anything about the ghosts, though. I've always thought that the best ghost stories are found in books. But what happens when the building where the books are kept is also a ghost story? Such may be the case with the award-winning public library in Homewood, Alabama, a city of 23,000 just south of Birmingham.

235

Disneyland's Dry Cleaning Gets an Energy Efficient Upgrade | Department  

Broader source: Energy.gov (indexed) [DOE]

Disneyland's Dry Cleaning Gets an Energy Efficient Upgrade Disneyland's Dry Cleaning Gets an Energy Efficient Upgrade Disneyland's Dry Cleaning Gets an Energy Efficient Upgrade March 16, 2011 - 2:58pm Addthis April Saylor April Saylor Former Digital Outreach Strategist, Office of Public Affairs What does this project do? In three hours, enough energy is recovered from the TMC to heat 15 loads of water for L&N's largest-capacity washing machine, and enough water is recovered to fill 1-1/2 loads of that same machine. As the provider of laundry and dry cleaning services for Disneyland Resort's costumes and hospitality supply items, L&N Costume and Linen Service knows a little something about both quantity and quality. Now, with the help of the Gas Technology Institute (GTI) and the Department of Energy, this forward-looking enterprise is embracing new, clean energy

236

County Partners with Siemens on Energy Upgrades | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

County Partners with Siemens on Energy Upgrades County Partners with Siemens on Energy Upgrades County Partners with Siemens on Energy Upgrades July 9, 2010 - 11:11am Addthis What does this project do? Allows McHenry County to install cutting edge technology to reduce our energy costs. When you're really committed to energy efficiency and looking at $118,000 in potential energy savings annually, you want to share it. That's the view in McHenry County, Ill., which partnered with Siemens Building Technologies to launch mchenrycounty-eecbg.net to let residents understand the connection between recent energy efficiency projects and C02 emissions. The county, located outside the Chicago metropolitan area, was awarded $2,475,900 in Energy Efficiency and Conservation Block Grant (EECBG) funds through the Recovery Act in November. Through the Recovery Act-funded

237

Secretary of Energy Announces Approval and Funding for Facilities Upgrade  

Broader source: Energy.gov (indexed) [DOE]

Announces Approval and Funding for Facilities Announces Approval and Funding for Facilities Upgrade at the Thomas Jefferson National Lab and Highlights Lab's Successful Education Programs Secretary of Energy Announces Approval and Funding for Facilities Upgrade at the Thomas Jefferson National Lab and Highlights Lab's Successful Education Programs February 22, 2006 - 12:09pm Addthis NEWPORT NEWS , VA - Secretary of Energy Samuel W. Bodman today announced that President Bush's Fiscal Year 2007 budget request includes $7 million for the upgrade of the Continuous Electron Beam Accelerator Facility (CEBAF) at Department of Energy's (DOE) Thomas Jefferson National Accelerator Facility. The secretary also visited with students and teachers from the Newport News area who participate in the lab's highly successful Becoming Enthusiastic about Math and Science (BEAMS) educational

238

Builder Brings Tradition to Efficient Home Upgrades | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Builder Brings Tradition to Efficient Home Upgrades Builder Brings Tradition to Efficient Home Upgrades Builder Brings Tradition to Efficient Home Upgrades October 15, 2009 - 5:51pm Addthis Joshua DeLung When Tom Wade's grandfather started building single-family homes, he may not have imagined how far his grandson would take the practice. Tom's father followed in the family footsteps and founded Artistic Homes in Albuquerque, N.M., in the mid-1980s. Now, Tom has led the company from simply building quality, affordable homes to innovating ones that are highly energy-efficient. "My grandfather would absolutely love what we're doing today because he had an incredible passion for - and an interest in - craftsmanship and improving the product, which in this case is the home," Tom says. "The fact that we're using science and technology is something he would

239

Energy Upgrade Program Revitalizing Oregon | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Energy Upgrade Program Revitalizing Oregon Energy Upgrade Program Revitalizing Oregon Energy Upgrade Program Revitalizing Oregon May 28, 2010 - 2:38pm Addthis Joshua DeLung What does this project do? Local businesses in 13 communities are getting energy makeovers in an effort to help business owners save hundreds of dollars each year and revitalize downtown areas. 'Main streets' in Clackamas County, Oregon, are undergoing a makeover - an energy-efficiency makeover. As part of the Clackamas County Energy Efficiency on Main Street Program, local businesses in 13 communities are getting energy makeovers in an effort to help business owners save hundreds of dollars each year and revitalize downtown areas. First to save The program needed a guinea pig to be the first to receive a free energy audit and found a willing participant in Key Carpets, a Molalla-based store

240

Forsyth County Slashes Energy Bills with Upgrades | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Forsyth County Slashes Energy Bills with Upgrades Forsyth County Slashes Energy Bills with Upgrades Forsyth County Slashes Energy Bills with Upgrades September 30, 2010 - 12:04pm Addthis A new energy management system in Forsyth County’s 52,057 square foot courthouse is expected to save about $9,000 annually. | Photo courtesy of Forsyth County A new energy management system in Forsyth County's 52,057 square foot courthouse is expected to save about $9,000 annually. | Photo courtesy of Forsyth County Maya Payne Smart Former Writer for Energy Empowers, EERE What are the key facts? Four large projects funded through Recovery Act grant Energy efficient retrofits to save county about $72,000 annually Forsyth County, Georgia has been among the nation's fastest growing counties for the past ten years. Given the growth, officials are working

Note: This page contains sample records for the topic "rock grounding upgrades" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Microsoft Word - CX_MerrittRadioStationUpgrade_2013.docx  

Broader source: Energy.gov (indexed) [DOE]

8, 2013 8, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Ben Deschuytter Project Manager - TEP-CSB-1 Proposed Action: Merritt Radio Station Upgrade Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.19 Microwave, meteorological, and radio towers Location: Winton, Chelan County, WA Township 26N, Range 16E, and Section 2 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA plans to upgrade its Merritt Radio Station in the Wenatchee River Ranger District of the Okanogan-Wenatchee National Forest (USFS). The proposed radio station upgrade would replace the existing communication building, electrical service, and propane tank with a new building and propane tank in adjacent locations on the

242

SLHC, the High-Luminosity Upgrade (public event)  

ScienceCinema (OSTI)

In the morning of June 23rd a public event is organised in CERN's Council Chamber with the aim of providing the particle physics community with up-to-date information about the strategy for the LHC luminosity upgrade and to describe the current status of preparation work. The presentations will provide an overview of the various accelerator sub-projects, the LHC physics prospects and the upgrade plans of ATLAS and CMS. This event is organised in the framework of the SLHC-PP project, which receives funding from the European Commission for the preparatory phase of the LHC High Luminosity Upgrade project. Informing the public is among the objectives of this EU-funded project. A simultaneous transmission of this meeting will be broadcast, available at the following address: http://webcast.cern.ch/

None

2011-10-06T23:59:59.000Z

243

Living Comfortably: A Consumer's Guide to Home Energy Upgrades |  

Broader source: Energy.gov (indexed) [DOE]

Living Comfortably: A Consumer's Guide to Home Energy Upgrades Living Comfortably: A Consumer's Guide to Home Energy Upgrades Living Comfortably: A Consumer's Guide to Home Energy Upgrades March 7, 2013 - 3:15pm Addthis A weatherization worker drills holes to blow cellulose insulation in the interior walls of this home. | Photo courtesy of Dennis Schroeder, NREL A weatherization worker drills holes to blow cellulose insulation in the interior walls of this home. | Photo courtesy of Dennis Schroeder, NREL Dr. Richard Knaub Project Leader in Weatherization & Workforce Development at the National Renewable Energy Laboratory Energy audit tools An infrared camera can display temperature differences between surfaces and help determine if a wall is insulated. It can show drafts and moisture, which can lead to mold problems.

244

When Energy Efficiency Upgrades and Ghost Stories Meet | Department of  

Broader source: Energy.gov (indexed) [DOE]

When Energy Efficiency Upgrades and Ghost Stories Meet When Energy Efficiency Upgrades and Ghost Stories Meet When Energy Efficiency Upgrades and Ghost Stories Meet October 31, 2011 - 5:21pm Addthis Homewood Public Library at Night | Photo Courtesy of Homewood Public Library Homewood Public Library at Night | Photo Courtesy of Homewood Public Library Tertia Speiser Project Officer, Golden Field Office What are the key facts? New heating and cooling equipment has saved the Homewood Public Library thousands of dollars a year. It hasn't done anything about the ghosts, though. I've always thought that the best ghost stories are found in books. But what happens when the building where the books are kept is also a ghost story? Such may be the case with the award-winning public library in Homewood, Alabama, a city of 23,000 just south of Birmingham.

245

Rock magnetism of remagnetized carbonate rocks: another look MIKE JACKSON* & NICHOLAS L. SWANSON-HYSELL  

E-Print Network [OSTI]

Rock magnetism of remagnetized carbonate rocks: another look MIKE JACKSON* & NICHOLAS L. SWANSON-HYSELL Institute for Rock Magnetism, Winchell School of Earth Sciences, University of Minnesota, Minnesota, US, dominantly in the super- paramagnetic and stable single-domain size range, also give rise to distinctive rock-magnetic

Swanson-Hysell, Nicholas

246

Building Upgrade Manual | ENERGY STAR Buildings & Plants  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Building Upgrade Manual Building Upgrade Manual Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In This Section Campaigns Commercial building design Communications resources Energy management guidance Financial resources Portfolio Manager Products and purchasing Recognition Research and reports Service and product provider (SPP) resources Success stories Target Finder

247

ENERGY STAR Building Upgrade Manual | ENERGY STAR Buildings & Plants  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ENERGY STAR Building Upgrade Manual ENERGY STAR Building Upgrade Manual Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In this section Learn the benefits Get started Use Portfolio Manager Save energy Stamp out energy waste Find cost-effective investments Engage occupants Purchase energy-saving products Put computers to sleep Get help from an expert Take a comprehensive approach

248

Phoenix Overcomes Barriers and Energizes Homeowners to Make Upgrades  

Broader source: Energy.gov [DOE]

Energize Phoenix is saving energy and money for homeowners, generating jobs, and transforming a diverse array of neighborhoods along a 10-mile stretch of the city's light rail line. Energize Phoenix's residential programs are open to homeowners of all income levels, but low-to-moderate income homeowners may realize greater benefits from energy efficiency upgrades because their homes often have older, inefficient equipment. Because upfront costs can deter low- to moderate-income residents from making upgrades, Energize Phoenix developed two programs to specifically address energy efficiency with this audience.

249

Dispersivity as an oil reservoir rock characteristic  

SciTech Connect (OSTI)

The main objective of this research project is to establish dispersivity, {alpha}{sub d}, as an oil reservoir rock characteristic and to use this reservoir rock property to enhance crude oil recovery. A second objective is to compare the dispersion coefficient and the dispersivity of various reservoir rocks with other rock characteristics such as: porosity, permeability, capillary pressure, and relative permeability. The dispersivity of a rock was identified by measuring the physical mixing of two miscible fluids, one displacing the other in a porous medium. 119 refs., 27 figs., 12 tabs.

Menzie, D.E.; Dutta, S.

1989-12-01T23:59:59.000Z

250

E-Print Network 3.0 - asdex upgrade divertor Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Summary: of code runs have been done in modelling ASDEX Upgrade with a range of divertor input powers, densities... .g. by shaping of the divertor as in ASDEX Upgrade) is the...

251

Energy Efficiency Upgrades Make a Big Difference to a Small Organizati...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Efficiency Upgrades Make a Big Difference to a Small Organization Energy Efficiency Upgrades Make a Big Difference to a Small Organization Photo of a man and woman standing outside...

252

Q&A: Financing Energy Efficiency Upgrades for Your Home through...  

Office of Environmental Management (EM)

Q&A: Financing Energy Efficiency Upgrades for Your Home through PowerSaver Loans Q&A: Financing Energy Efficiency Upgrades for Your Home through PowerSaver Loans February 19, 2015...

253

Substation grounding programs  

SciTech Connect (OSTI)

This document is a users manual and applications guide for the software package SGA. This package comprises four computer programs, namely SOMIP, SMECC, SGSYS, and TGRND. The first three programs are analysis models which are to be used in the design process of substation grounding systems. The fourth program, TGRND, is an analysis program for determining the transient response of a grounding system. This report, Volume 5, is an applications guide of the three computer programs. SOMIP, SMECC, and SGSYS, for the purpose of designing a safe substation grounding system. The applications guide utilizes four example substation grounding systems for the purpose of illustrating the application of the programs, SOMIP, SMECC, and SGSYS. The examples are based on data provided by four contributing utilities, namely, Houston Lighting and Power Company, Southern Company Services, Puget Sound Power and Light Company, and Arizona Public Service Company. For the purpose of illustrating specific capabilities of the computer programs, the data have been modified. As a result, the final designs of the four systems do not necessarily represent actual grounding system designs by these utilities. The example system 1 is a 138 kV/35 kV distribution substation. The example system 2 is a medium size 230 kV/115 kV transmission substation. The third example system is a generation substation while the last is a large 525 kV/345 kV/230 kV transmission substation. The four examples cover most of the practical problems that a user may encounter in the design of substation grounding systems.

Meliopoulos, A.P.S. (Georgia Inst. of Tech., Atlanta, GA (United States). Electric Power Lab.)

1992-05-01T23:59:59.000Z

254

Waste/Rock Interactions Technology Program: the status of radionuclide sorption-desorption studies performed by the WRIT program  

SciTech Connect (OSTI)

The most credible means for radionuclides disposed as solid wastes in deep-geologic repositories to reach the biosphere is through dissolution of the solid waste and subsequent radionuclide transport by circulating ground water. Thus safety assessment activities must consider the physicochemical interactions between radionculides present in ground water with package components, rocks and sediments since these processes can significantly delay or constrain the mass transport of radionuclides in comparison to ground-water movement. This paper focuses on interactions between dissolved radiouclides in ground water and rocks and sediments away from the near-field repository. The primary mechanism discussed is adsorption-desorption, which has been studied using two approaches. Empirical studies of adsorption-desorption rely on distribution coefficient measurements while mechanism studies strive to identify, differentiate and quantify the processes that control nuclide retardation.

Serne, R.J.; Relyea, J.F.

1982-04-01T23:59:59.000Z

255

Project L-070, ``300 Area process sewer piping system upgrade`` Project Management Plan  

SciTech Connect (OSTI)

This document is the project management plan for Project L-070, 300 Area process sewer system upgrades.

Wellsfry, H.E.

1994-09-16T23:59:59.000Z

256

Upgrade LCDs or TVs with improved ergonomic adjustability  

E-Print Network [OSTI]

Highlights · Upgrade LCDs or TVs with improved ergonomic adjustability · Constant Force (CFTM comfort and productivity · 5 (130 mm) height range easily meets the ergonomic height needs of the average compliant Product Sheet Affordable desktop ergonomics Neo-FlexTM LCD Stand 870-05-067, rev. 03/08/07 www

Saskatchewan, University of

257

Progress in MPC and A upgrades at Luch  

SciTech Connect (OSTI)

Luch, a MINATOM facility, has been engaged in both scientific research and uranium processing for fifty years. Since the spring of 1996, Luch has participated in a program of US/Russia Cooperation in Nuclear MPC and A Upgrades. The program began with planning for immediate upgrades in MPC and A, with en emphasis on physical protection. In addition, US and Luch experts exchanged technical data during a number of workshops, to establish a common understanding of available MPC and A tools and equipment. Site characterizations and vulnerability assessments were then prepared by Luch, to form the basis for the current program of methodical upgrades in all areas of MPC and A. Access control, alarms and alarm communications are being improved as part of this program. Control of nuclear material is being enhanced through improvements in material monitoring and in transportation security when nuclear material is moved between buildings on the Luch site. A comprehensive, site-wide computer network for Luch was designed during a recent workshop. Acquiring and installing this computer system, complete with COREMAS software, is currently in progress. Nuclear material analysis will be improved through NDA techniques using Canberra InSpector systems. The planned upgrades in nuclear MPC and A will reinforce safeguards over large quantities of HEU at Luch.

Mizin, P.; Chukov, V.; Rogatchev, V. [Gosudarstvennyj Nauchno-Issledovatel`skij Inst. NPO Luch, Podol`sk (Russian Federation); Curtiss, J. [Brookhaven National Lab., Upton, NY (United States); Erkkila, B. [Los Alamos National Lab., NM (United States); Goodey, K. [Pacific Northwest National Lab., Richland, WA (United States); Hembree, D. Jr. [Oak Ridge National Lab., TN (United States); Lowe, D. [Sandia National Labs., Albuquerque, NM (United States); Turner, C. [Lawrence Livermore National Lab., CA (United States)

1997-09-01T23:59:59.000Z

258

Tank farm instrumentation and data acquisition/management upgrade plan  

SciTech Connect (OSTI)

This plan provides the strategy, implementation, and schedule for upgrading tank farm instrumentation, data acquisition and data management. The focus is on surveillance parameters to verify and maintain tank safety. The criteria do not necessarily constitute mandatory requirements but are based upon engineering judgement and best available information. Schedules reflect preliminary funding for FY95. For out years they are best engineering judgment.

Scaief, C.C. III

1994-09-13T23:59:59.000Z

259

Runner upgrading: Learning from Ontario Hydro`s experience  

SciTech Connect (OSTI)

Planning, design, and implementation of turbine runner replacement at Ontario Hydro is described in the article. The use of fully homologous modeling for upgrade projects, including both francis and propeller runner types, is outlined. Confirmation of physical model efficiency is obtained through numerical modeling. Inlet connections, setting cavitation-erosion guarantees, and other guarantees included in tender documents are also described in some detail.

Kee, D.C.; Markovich, M.S.; Munro, R.I. [Ontario Hydro (Canada)

1997-02-01T23:59:59.000Z

260

Ash Deposition Behavior of Upgraded Brown Coal and Bituminous Coal  

Science Journals Connector (OSTI)

Ash Deposition Behavior of Upgraded Brown Coal and Bituminous Coal ... Ash with a low melting point causes slagging and fouling problems in pulverized coal combustion boilers. ... The ash composition in coal and operational conditions in boilers such as heat load greatly affect the ash deposition behavior. ...

Katsuya Akiyama; Haeyang Pak; Toshiya Tada; Yasuaki Ueki; Ryo Yoshiie; Ichiro Naruse

2010-07-22T23:59:59.000Z

Note: This page contains sample records for the topic "rock grounding upgrades" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Upgraded recovery boiler meets low air emissions standards  

SciTech Connect (OSTI)

In the fall of 1990, the Boise Cascade mill in International Falls, MN, carried out a millwide modernization project. One critical element of the project was the upgrade of their recovery boiler. As a result of the recovery boiler upgrade, the mill was required to obtain a prevention of significant deterioration (PSD) air permit. A best available control technology (BACT) assessment was performed as a requirement of the PSD regulations. Ultimately, a number of more stringent air pollution emission limits were established for the boiler, and a continuous emissions monitoring system (CEMS) was purchased and installed to report daily results to the Minnesota Pollution Control Agency. This paper describes efforts to achieve increased firing capacity in the mill's recovery boiler while meeting more severe air emissions regulations. The authors will show that each of the emissions limits, including CO, SO[sub 2], NO[sub x], TRS, and opacity, are met by the upgraded boiler, while achieving an increase in firing capacity over pre-upgrade levels of up to 40%.

La Fond, J.F.; Jansen, J.H. (Jansen Combustion and Boiler Technologies, Inc., Woodinville, WA (United States)); Eide, P. (Boise Cascade Corp., International Falls, MN (United States))

1994-12-01T23:59:59.000Z

262

Recent Upgrade of the Klystron Modulator at SLAC  

SciTech Connect (OSTI)

The SLAC National Accelerator Laboratory employs 244 klystron modulators on its two-mile-long linear accelerator that has been operational since the early days of the SLAC establishment in the sixties. Each of these original modulators was designed to provide 250 kV, 262 A and 3.5 {mu}S at up to 360 pps using an inductance-capacitance resonant charging system, a modified type-E pulse-forming network (PFN), and a pulse transformer. The modulator internal control comprised of large step-start resistor-contactors, vacuum-tube amplifiers, and 120 Vac relays for logical signals. A major, power-component-only upgrade, which began in 1983 to accommodate the required beam energy of the SLAC Linear Collider (SLC) project, raised the modulator peak output capacity to 360 kV, 420 A and 5.0 {mu}S at a reduced pulse repetition rate of 120 pps. In an effort to improve safety, performance, reliability and maintainability of the modulator, this recent upgrade focuses on the remaining three-phase AC power input and modulator controls. The upgrade includes the utilization of primary SCR phase control rectifiers, integrated fault protection and voltage regulation circuitries, and programmable logic controllers (PLC) -- with an emphasis on component physical layouts for safety and maintainability concerns. In this paper, we will describe the design and implementation of each upgraded component in the modulator control system. We will also report the testing and present status of the modified modulators.

Nguyen, M.N.; Burkhart, C.P.; Lam, B.K.; Morris, B.; /SLAC

2011-11-04T23:59:59.000Z

263

Employee-Focused Structure Helps Produce Upgrades for Contractor  

Broader source: Energy.gov [DOE]

Progressive Building Solutions, an energy efficiency contractor participating in Seattle, Washington's Community Power Works program, has an intriguing model to help its employees feel connected to the company's success—employees are part owners. The company's creator, Suraj Lobo, built Progressive Energy Solutions around three pillars: employee ownership; development of energy efficiency best practices; and superior energy upgrade work.

264

Westover ARB Fuel Hydrant System Upgrade set to begin  

E-Print Network [OSTI]

Westover ARB Fuel Hydrant System Upgrade set to begin Story on page 4 #12;2 YANKEE ENGINEER August, many along the East Coast felt the impact of Hurricane Sandy, one of the largest hurricanes in history's way. · Make sure to fully charge your cell phone or other mobile devices so you can communicate after

US Army Corps of Engineers

265

Innovative Technology Improves Upgrading Process for Unconventional Oil  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

09, 2013 09, 2013 Innovative Technology Improves Upgrading Process for Unconventional Oil Resources Washington, D.C. - An innovative oil-upgrading technology that can increase the economics of unconventional petroleum resources has been developed under a U.S. Department of Energy -funded project. The promising technology, developed by Ceramatec of Salt Lake City, Utah, and managed by the Office of Fossil Energy's National Energy Technology Laboratory, has been licensed to Western Hydrogen of Calgary for upgrading bitumen or heavy oil from Canada. A new company, Field Upgrading (Calgary, Alberta), has been formed dedicated to developing and commercializing the technology. Heavy oil is crude oil that is viscous and requires thermally enhanced oil recovery methods, such as steam and hot water injection, to reduce its viscosity and enable it to flow. The largest U.S. deposits of heavy oil are in California and on Alaska's North Slope. Estimates for the U.S. heavy oil resource total about 104 billion barrels of oil in place - nearly five times the United States' proved reserves. In addition, although no commercial-scale development of U.S. oil sands or oil shale has yet occurred, both represent another potential future domestic unconventional oil resource.

266

T Plant secondary containment and leak detection upgrades  

SciTech Connect (OSTI)

The W-259 project will provide upgrades to the 2706-T/TA Facility to comply with Federal and State of Washington environmental regulations for secondary containment and leak detection. The project provides decontamination activities supporting the environmental restoration mission and waste management operations on the Hanford Site.

Carlson, T.A.

1995-10-19T23:59:59.000Z

267

K.K. Gan ATLAS Tracker Upgrade Workshop 1 Progress Report on Joint ATLAS/CMS  

E-Print Network [OSTI]

K.K. Gan ATLAS Tracker Upgrade Workshop 1 Progress Report on Joint ATLAS/CMS SLHC Opto ATLAS Tracker Upgrade Workshop 2 Outline Introduction Subgroups activities Summary #12;K.K. Gan ATLAS System #12;K.K. Gan ATLAS Tracker Upgrade Workshop 4 Group A: Lesson Learned and to be Learned from LHC

Gan, K. K.

268

ATLAS ID Upgrade R&D Plan: Development of a Short-Strip Silicon Detector Module  

E-Print Network [OSTI]

ATLAS ID Upgrade R&D Plan: Development of a Short-Strip Silicon Detector Module and a Frontend of the optimum technology and layout of the tracking detectors for the upgraded ATLAS ID. The goal for the intermediate tracking region in the upgraded ATLAS ID. We anticipate that much of the work would then also

California at Santa Cruz, University of

269

Upgrading Methane Using Ultra-Fast Thermal Swing Adsorption  

SciTech Connect (OSTI)

The purpose of this project is to design and demonstrate an approach to upgrade low-BTU methane streams from coal mines to pipeline-quality natural gas. The objective of Phase I of the project was to assess the technical feasibility and cost of upgrading low-BTU methane streams using ultra-fast thermal swing adsorption (TSA) using Velocys modular microchannel process technology. The objective of Phase II is to demonstrate the process at the bench-scale. Natural gas upgrading systems have six main unit operations: feed compressor, dehydration unit, nitrogen rejection unit, deoxygenator, carbon dioxide scrubber, and a sales compressor. The NRU is the focus of the development program, and a bench-scale demonstration has been initiated. The Velocys NRU system targets producing methane with greater than 96% purity and at least 90% recovery for final commercial operation. A preliminary cost analysis of the methane upgrading system, including the Velocys NRU, suggests that costs below $2.00 per million (MM) BTU methane may be achieved. The cost for a conventional methane upgrading system is well above $2.30 per MM BTU, as benchmarked in an Environmental Protection Agency study. The project is on schedule and on budget. Task 4, a bench-scale demonstration of the ultra-fast TSA system is complete. Rapid thermal swing of an adsorbent bed using microchannels has been successfully demonstrated and the separation of a 70% methane and 30% nitrogen was purified to 92% methane. The bench-scale demonstration unit was small relative to the system dead volume for the initial phase of experiments and a purge step was added to sweep the dead volume prior to desorbing the bed and measuring purity. A technical and economic feasibility assessment was completed in Task 3. The proposed Velocys technology appears feasible for the methane upgrading market. Evaluated categories include adsorbent selection, rapid-cycle valve selection, microchannel manufacturability assessment, and system design and cost. The selected adsorbent, granular microporous carbon from either Barnaby-Sutcliffe or Calgon, experimentally demonstrated sufficient methane capacity under differential temperature at 100 pounds per square inch gauge. Several valve options were identified, including candidates that can operate millions of cycles between refurbishment. The microchannel adsorber and desorber designs were made using internal Velocys manufacturability standards, and the associated costs are acceptable as included with the complete nitrogen rejection unit (NRU) cost projection. A system design and cost estimate was completed for the NRU section of the methane upgrading system. As integrated into the complete system, the cost is in line with the market requirement.

Anna Lee Tonkovich

2005-07-01T23:59:59.000Z

270

Influence of rock mass fracturing on the net penetration rates of hard rock \\{TBMs\\}  

Science Journals Connector (OSTI)

Abstract Penetration rates during excavation using hard rock tunnel boring machines (TBMs) are significantly influenced by the degree of fracturing of the rock mass. In the NTNU prediction model for hard rock TBM performance and costs, the rock mass fracturing factor (ks) is used to include the influence of rock mass fractures. The rock mass fracturing factor depends on the degree of fracturing, fracture type, fracture spacing, and the angle between fracture systems and the tunnel axis. In order to validate the relationship between the degree of fracturing and the net penetration rate of hard rock TBMs, field work has been carried out, consisting of geological back-mapping and analysis of performance data from a TBM tunnel. The rock mass influence on hard rock TBM performance prediction is taken into account in the NTNU model. Different correlations between net penetration rate and the fracturing factor (ks) have been identified for a variety of ks values.

F.J. Macias; P.D. Jakobsen; Y. Seo; A. Bruland

2014-01-01T23:59:59.000Z

271

Substation grounding programs  

SciTech Connect (OSTI)

The five volume report comprises the user manual, installation, and validation manual and an applications guide for the SGA (Substation Grounding Analysis) software package. SGA consists of four computer programs: (1) SOMIP, (2) SMECC, (3) SGSYS, and (4) TGRND. The first three programs provide a comprehensive analysis tool for the design of substation grounding systems to meet safety standards. The fourth program, TGRND, provides a state of the art analysis tool for computing transient ground potential rise and ground system impedance. This part of the report, Volume 1, is a users manual and an installation and validation manual for the computer program SOMIP (SOil Measurement Interpretation Program). This program computes the best estimate of the parameters of a two layer soil model from usual soil resistivity measurements. Four pin or three pin soil measurements can be accommodated. In addition, it provides error bounds on the soil parameters for a given confidence level. The users manual describes data requirements and data preparation procedures. The installation and validation manual describes the computer files which make up the program SOMIP and provides two test cases for validation purposes. 4 refs.

Meliopoulos, A.P.S. (Georgia Inst. of Tech., Atlanta, GA (United States). School of Electrical Engineering)

1992-05-01T23:59:59.000Z

272

Low rank coal upgrading in a flow of hot water  

SciTech Connect (OSTI)

Simultaneous hydrothermal degradation and extraction at around 350{sup o}C using flowing solvent as a reaction/extraction medium were proposed for upgrading brown coal, more specifically, for converting brown coal into several fractions having different molecular weight and chemical structure under mild conditions. When an Australian brown coal, Loy Yang coal, was treated by water at 350{sup o}C under 18 MPa, the coal was separated into four fractions: gaseous product by 8% yield, water-soluble extract at room temperature (soluble) by 23% yield, extract precipitates as solid at room temperature (deposit) by 23% yield, and residual coal (upgraded coal) by 46% yield on daf basis. The separation was found to be realized by in situ extraction of low-molecular-weight substances released from coal macromolecular structure and/or those generated by hydrothermal decomposition reactions at 350{sup o}C. The solid products obtained, deposit and upgraded coal, were characterized in detail to examine the possibility of their effective utilization as solid fuel and chemical feed stock. The upgraded coal showed higher heating value and higher gasification reactivity than the parent coal, indicating that the upgraded coal can be a better solid fuel than the parent coal. The solid extract, deposit, was found to show thermoplasticity at less than 200{sup o}C, suggesting the possibility of utilizing the deposit as a raw material of high performance carbon materials. Several variables affecting the performance of the proposed method are also examined in detail in this paper. 12 refs., 8 figs., 3 tabs.

Masato Morimoto; Hiroyuki Nakagawa; Kouichi Miura [Kyoto University, Kyoto (Japan). Department of Chemical Engineering

2009-09-15T23:59:59.000Z

273

Big Bang Day : Physics Rocks  

ScienceCinema (OSTI)

Is particle physics the new rock 'n' roll? The fundamental questions about the nature of the universe that particle physics hopes to answer have attracted the attention of some very high profile and unusual fans. Alan Alda, Ben Miller, Eddie Izzard, Dara O'Briain and John Barrowman all have interests in this branch of physics. Brian Cox - CERN physicist, and former member of 90's band D:Ream, tracks down some very well known celebrity enthusiasts and takes a light-hearted look at why this subject can appeal to all of us.

None

2011-04-25T23:59:59.000Z

274

Simulation and Design of Ground-Penetrating Radar for Mars Exploration C. J. Leuschen1  

E-Print Network [OSTI]

-surface aqueous reservoirs. This paper outlines the simulation and development of a lightweight, low-power, ground life. Finally, any accessible reservoirs could provide crucial resources for future manned exploration the framework of historical geology [3]." It expresses the relationship of the rocks and soils of the terrain

Kansas, University of

275

Coherence, Strain, and Phase Velocity of Strong Ground Motions in the Mississippi Charles A. Langston  

E-Print Network [OSTI]

ground motions in the deep, unconsolidated Mississippi embayment sediments since there are no comparable within the thick, unconsolidated sedimentary column, the high velocity basement rocks, and small is the existence of thick, unconsolidated sediments that blanket the area and attain thicknesses of up to kilometer

Langston, Charles A.

276

Rock Energy Cooperative (Illinois) | Open Energy Information  

Open Energy Info (EERE)

Energy Cooperative (Illinois) Jump to: navigation, search Name: Rock Energy Cooperative Place: Illinois References: EIA Form EIA-861 Final Data File for 2010 - File220101 EIA...

277

Ground Squirrels and Gophers  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Squirrels and Gophers Squirrels and Gophers Nature Bulletin No. 224-A April 2, 1966 Forest Preserve District of Cook County Seymour Simon, President Roland F. Eisenbeis, Supt. of Conservation GROUND SQUIRRELS AND GOPHERS On sunny summer days, a dusty-colored animal with yellowish and brown stripes, about the size of a small rat, often may be noticed creeping through the grass of prairies, pastures, golf courses or lawns. Watch him. He pauses every few feet to sit up, look and listen for a moment. Nervous and timid, he crouches low at every distant sound or passing shadow. Startle him and he scurries away, and then may suddenly halt and freeze, bolt upright, as stiff and straight as a stake driven in the ground. If approached, he gives a loud shrill trilling whistle and, with a flip of his tail, pops out of sight. Watch that spot closely and, in less than a minute, a snaky head appears. Be quiet. He has many enemies above ground and he also has a lot of curiosity. Presently he sits up upon his haunches again.

278

Ground Water Recovery and Treatment  

Science Journals Connector (OSTI)

Until the environmental revolution, the only ground water that was routinely treated to remove contamination was the impacted ground water that was extracted for beneficial use. With ... the recognition that cont...

Tie Li Ph.D.; Raaj U. Patel P.G.; David K. Ramsden Ph.D.…

2003-01-01T23:59:59.000Z

279

MFRSR Head Refurbishment, Data Logger Upgrade and Calibration Improvements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

MFRSR Head Refurbishment, Data Logger Upgrade MFRSR Head Refurbishment, Data Logger Upgrade and Calibration Improvements Gary Hodges, CIRES/NOAA and John Schmelzer, PNL gary.hodges@noaa.gov, john.schmelzer@pnl.gov 17th Annual ARM Science Team Meeting 26-30 March 2006 Monterey, CA Head Refurbishment The Process Includes: * New filter detectors * Relocate internal thermistors * New connectors * Gain resistors moved to head * Improved insulation The Finished Heads: * Are lamp calibrated * Have filter profiles measured * Cosine characterized * Are out-of-band tested What Does This Mean For Data Users? * Fewer data gaps * Fewer DQRs * Confidence in the data * Well calibrated data Calibration Improvements 5 6 7 8 0 2 4 6 Airmass ln Direct Data will now be calibrated by the Langley method Extrapolate to TOA to get V 0 Benefits of Langley vs. Lamp calibrations:

280

HERA Luminosity Upgrade Magnet Production | Superconducting Magnet Division  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

HERA Luminosity Upgrade Magnet Production HERA Luminosity Upgrade Magnet Production Photos taken on or before 12-May-2000. GO horizontal test setup GO horizontal test setup view toward lead tower GO horizontal test setup GO horizontal test setup GO horizontal test setup GO horizontal test setup GO horizontal test setup GO horizontal test setup GO horizontal test setup GO horizontal test setup GO horizontal test setup GO horizontal test setup lead tower feedthroughs Close up of lead tower feedthroughs lead tower feedthroughs Close up of lead tower feedthroughs lead tower feedthroughs Close up of lead tower feedthroughs GO horizontal test setup GO horizontal test setup GO horizontal test setup GO horizontal test setup GO Coldmass GO Coldmass GO sextupole coil GO sextupole coil GO quadrupole coil lead end GO quadrupole coil lead end

Note: This page contains sample records for the topic "rock grounding upgrades" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Microsoft Word - CX_TunkRadioStationUpgrade_2012.docx  

Broader source: Energy.gov (indexed) [DOE]

May 30, 2012 May 30, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Ben Deschuytter Project Manager - TEP-CSB-1 Proposed Action: Tunk Mountain Radio Station Upgrade Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.19- Siting/construction/operation of microwave/radio communication towers Location: Synarep, Okanogan County, WA Township 35N, Range 29E, and Section 8 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA plans to upgrade its Tunk Mountain Radio Station in the Tonasket Ranger District of the Okanogan-Wenatchee National Forest. BPA is coordinating with the U.S. Forest Service (USFS) to ensure the existing land use permit is

282

Microsoft Word - AlbionButteRSCommunicationUpgrade-CX.doc  

Broader source: Energy.gov (indexed) [DOE]

4, 2011 4, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearence Memorandum David Tripp - TEP-CSB-1 Proposed Action: Albion Butte Radio Station Communication Upgrade Budget Information: Work Order # 00253466 Task 03 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021: B1.7 "Acquisition, installation, operation, and removal of communication systems..." Location: Cassia County, Idaho - Section 19, Township 11 South, Range 26 East of the Nibbs Creek Quadrangle Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to upgrade the communication building and equipment at BPA's Albion Butte Radio Station located in Cassia County, ID. This project is part of an

283

Microsoft Word - Holcomb and Naselle Communication Upgrade CX.doc  

Broader source: Energy.gov (indexed) [DOE]

6, 2011 6, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearence Memorandum David Tripp - TEP-CSB-1 Proposed Action: Holcomb Radio Station and Naselle Substation Communication Upgrade Project Budget Information: Work Order # 00253203 and # 00253206 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021: B1.7 "Acquisition, installation, operation, and removal of communication systems..." Locations: Holcomb Radio Station: Pacific County, Washington - Township 13 North, Range 7 West, Section 30 of the Lebam Quadrangle Naselle Substation: Pacific County, Washington - Township 10 North, Range 9 West, Section 4 of the Oman Ranch Quadrangle Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to upgrade the communication equipment at

284

Posted CX Q14 Sprinkler System Upgrade.pdf  

Broader source: Energy.gov (indexed) [DOE]

(NEPA) Categorical Exclusion (eX) (NEPA) Categorical Exclusion (eX) Determination Summary Form Q14 Sprinkler System Upgrade Project REFERENCE J 10 CFR Part 1021 , Department of Energy National Environmental Policy Act Implementation Procedures, Subpart 0 , Typical Classes of Actions PROJECT SCOPE DISCUSSION The project scope will upgrade the Q14 sprinkler system to meet exposed plastic design basis requirements by installing a fire pump and performing modifications to the Q14 sprinkler piping. The fire pump will be a pre-assembled skid system with enclosure diesel powered pump and associated diesel storage tank. The fire pump assembly wi ll be located on a foundation pad in the grassy area ,;!orthwest of 014. Electrical work will include providing general power to the fire pump building and fire pump control/alarm wiring to a fire alarm panel in the 014

285

Investment and Upgrade in Distributed Generation under Uncertainty  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Investment and Upgrade in Distributed Generation under Uncertainty Investment and Upgrade in Distributed Generation under Uncertainty Speaker(s): Afzal Siddiqui Karl Maribu Date: September 4, 2008 - 12:00pm Location: 90-3122 Seminar Host/Point of Contact: Galen Barbose The ongoing deregulation of electricity industries worldwide is providing incentives for microgrids to use small-scale distributed generation (DG) and combined heat and power (CHP) applications via heat exchangers (HXs) to meet local energy loads. Although the electric-only effciency of DG is lower than that of central-station production, relatively high tariff rates and the potential for CHP applications increase the attractiveness of on-site generation. Nevertheless, a microgrid contemplating the installation of gas-fired DG has to be aware of the uncertainty in the

286

Microsoft Word - Lower-MidColumbia-Upgrade-CX.doc  

Broader source: Energy.gov (indexed) [DOE]

3, 2010 3, 2010 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Steve Prickett Project Manager - TEP Proposed Action: Lower Mid-Columbia / Midway-Vantage 230-kV Transmission Line Upgrade Project Budget Information: Work Order #238901 and #231311, Task 03 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 "Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility..." B4.7 Adding fiber optic cable to transmission structures or burying fiber optic cable in existing transmission line rights-of-way. B4.13 "Reconstruction (upgrading or rebuilding) and/or minor relocation of existing electric powerlines

287

Microsoft Word - CX-2013ElectronicEquipmentUpgrades_WEB.docx  

Broader source: Energy.gov (indexed) [DOE]

April 12, 2013 April 12, 2013 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Cleareance Memorandum Molly Kovaka Bob Trismen Contractor - TEP-CSB-2 Electrical Engineer - TEP-CSB-1 Proposed Action: Electronic Equipment Upgrades and Emergency Generator Replacements PP&A Project No: 2571 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic Equipment; B1.3 Routine maintenance activities Location: Multiple locations within Bonneville Power Administration's (BPA) service area. Proposed by: BPA Description of the Proposed Action: BPA proposes to upgrade electronic equipment required for operation of its transmission grid and replace emergency generators. Several types of actions involving communications, meters, relays, and Remedial Action Scheme (RAS) and Supervisory

288

Microsoft Word - CX_MetalineRadioStationUpgrade_2012.docx  

Broader source: Energy.gov (indexed) [DOE]

July 11, 2012 July 11, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Ben Deschuytter Project Manager - TEP-CSB-1 Proposed Action: Metaline Radio Station Upgrade Project Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.19- Siting/construction/operation of microwave/radio communication towers Location: Metaline Falls, Pend Orielle County, WA Township 40N, Range 43E, Section 31 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to upgrade its Metaline Radio Station in the Sullivan Lake Ranger District of the Colville National Forest. BPA is coordinating with the US Forest Service (USFS) to ensure the existing land use agreement is modified to adequately address

289

Interaction Region Upgrades of e+ e- B-Factories  

SciTech Connect (OSTI)

Both the PEP-II and KEKB B-Factories have plans to upgrade their Interaction Regions (IRs) in order to improve luminosity performance. Last summer PEP-II added cooling to the IR beam pipe in order to increase beam currents thereby raising the luminosity. In addition, PEP-II is working on a design that modifies the permanent magnets near the Interaction Point (IP) for an even higher luminosity increase. KEKB is also planning an improvement to their IR that will decrease the detector beam pipe radius. In addition, KEK has a design to increase the luminosity of KEKB to 1 x 10{sup 35} cm{sup -2} sec{sup -1} which includes changes to the IR. PEP-II is also investigating the feasibility of a 1 x 10{sup 36} cm{sup -2} sec{sup -1} luminosity design. I summarize these various upgrades and concentrate on issues common to the different designs.

Sullivan, M.; /SLAC

2008-02-22T23:59:59.000Z

290

Upgrading the Radioactive Waste Management Infrastructure in Azerbaijan  

SciTech Connect (OSTI)

Radionuclide uses in Azerbaijan are limited to peaceful applications in the industry, medicine, agriculture and research. The Baku Radioactive Waste Site (BRWS) 'IZOTOP' is the State agency for radioactive waste management and radioactive materials transport. The radioactive waste processing, storage and disposal facility is operated by IZOTOP since 1963 being significantly upgraded from 1998 to be brought into line with international requirements. The BRWS 'IZOTOP' is currently equipped with state-of-art devices and equipment contributing to the upgrade the radioactive waste management infrastructure in Azerbaijan in line with current internationally accepted practices. The IAEA supports Azerbaijan specialists in preparing syllabus and methodological materials for the Training Centre that is currently being organized on the base of the Azerbaijan BRWS 'IZOTOPE' for education of specialists in the area of safety management of radioactive waste: collection, sorting, processing, conditioning, storage and transportation. (authors)

Huseynov, A. [Baku Radioactive Waste Site IZOTOP, Baku (Azerbaijan); Batyukhnova, O. [State Unitary Enterprise Scientific and Industrial Association Radon, Moscow (Russian Federation); Ojovan, M. [Sheffield Univ., Immobilisation Science Lab. (United Kingdom); Rowat, J. [International Atomic Energy Agency, Dept. of Nuclear Safety and Security, Vienna (Austria)

2007-07-01T23:59:59.000Z

291

Upgrade of the proximity focusing RICH at Jlab  

SciTech Connect (OSTI)

The Hall A RICH at Jefferson Lab is undergoing an upgrade to adapt to the higher momentum kinematics of the neutron spin structure Transversity experiments planned to run in 2008. The JLab RICH is a proximity focusing detector using liquid C6F14 as Cherenkov radiator, a thin layer of CsI as photon converter, evaporated on segmented pad panels of a proportional chamber. The original RICH had a superior hadron identification up to 2 GeV/c with pion/kaon rejection at the level of 1:1000 at ~ similar90% intrinsic efficiency. The upgrade will extend this performance above 2.4 GeV/c by means of a larger photon detector (a multiwire-multipad proportional chamber) and a longer proximity gap which will improve the photon detection geometrical efficiency and the angular resolution, respectively.

Cisbani, Evaristo; Colilli, Stefano; Cusanno, Francesco; Fratoni, Rolando; Frullani, Salvatore; Garibaldi, Franco; Giuliani, Fausto; Gricia, Massimo; Lucentini, Maurizio; Santavenere, Fabio; Urciuoli, Guido; Iodice, Mauro; Argentieri, A.; de Cataldo, Giacinto; De Leo, Raffaele; Lagamba, Luigi; Marrone, Stefano; Nappi, E.; Camsonne, Alexandre; Kross, Brian; Michaels, Robert; Reitz, Bodo; Segal, John; Wojtsekhowski, Bogdan; Zorn, Carl; Monno, E.; Breuer, Herbert

2009-09-01T23:59:59.000Z

292

Phased approach to the LHC Insertion Upgrade and Magnet Challenges  

E-Print Network [OSTI]

The LHC is on its way for operation with beam in 2008. The first goal of CERN and the LHC community is to ensure that the collider is operated efficiently, gradually reaching its maximal performance. In parallel, discussions have started and there is already a wealth of ideas on the possible directions for upgrading the LHC insertions. In this talk, we illustrate some of the constraints limiting the upgrade scenarios, and argue that a phased approach with several intermediate targets is necessary. In the first phase, the known bottleneck in the low-? triplets needs to be removed in the perspective of the physics run of 2013. This phase relies on the mature Nb-Ti superconducting magnet technology, where improvements for a small scale production are still possible.

Ostojic, R

2008-01-01T23:59:59.000Z

293

Using EPICS enabled industrial hardware for upgrading control systems  

SciTech Connect (OSTI)

Los Alamos National Laboratory has been working with National Instruments (NI) and Cosy lab to implement EPICS Input Output Controller (IOC) software that runs directly on NI CompactRIO Real Time Controller (RTC) and communicates with NI LabVIEW through a shared memory interface. In this presentation, we will discuss our current progress in upgrading the control system at the Los Alamos Neutron Science Centre (LANSCE) and what we have learned about integrating CompactRIO into large experimental physics facilities. We will also discuss the implications of using Channel Access Server for LabVIEW which will enable more commercial hardware platforms to be used in upgrading existing facilities or in commissioning new ones.

Bjorkland, Eric A [Los Alamos National Laboratory; Veeramani, Arun [NATIONAL INSTRUMENTS; Debelle, Thierry [NATIONAL INSTRUMENTS

2009-01-01T23:59:59.000Z

294

Microwave interferometer for plasma-density measurement on TMX Upgrade  

SciTech Connect (OSTI)

A four-channel microwave interferometer operating at 140 GHz has been designed for installation on the upgrade to the Tandem Mirror Experiment (TMX Upgrade). The instrument can be used to measure plasma density simultaneously at four locations: by reconnecting the waveguide runs, density can be measured at other locations of interest. The design is an outgrowth of a system used on TMX, but includes some newly developed hardware. An over-mode circular waveguide system is used to transport the signals over long distances with only moderate losses. Several precautions have been taken to limit the effect of possible interference from the electron cyclotron resonant heating (ECRH) system used to heat the plasma. A high-resolution linear phase comparator has been designed that will operate over the wide range of signals expected. A CAMAC-based data-acquisition system provides for automatic data sampling and archival after each shot.

Coffield, F.E.; Stever, R.D.; Lund, N.P.

1981-09-25T23:59:59.000Z

295

UPGRADING THE AGS TO 1 MW PROTON BEAM POWER.  

SciTech Connect (OSTI)

The Brookhaven Alternating Gradient Synchrotron (AGS) is a strong focusing accelerator that is used to accelerate protons and various heavy ion species to an equivalent proton energy of 29 GeV. At this energy the maximum intensity achieved is around 7 x 10{sup 13} protons per pulse. This corresponds to an average beam power of about 0.2 MW. Future programs in high-energy physics, as for instance a neutrino factory with the AGS as the proton driver [l], may require an upgrade of the AGS to an average beam power of 1 MW, at the energy of 24 GeV. This can be achieved with an increase of the beam intensity to 1 x 1014 protons per pulse, a 1.2-GeV superconducting linac as a new injector, and by upgrading the power supply and rf systems to allow cycling at 2.5 beam pulses per second.

BRENNAN,M.J.; MARNERIS,I.; ROSER,T.; RUGGIERO,A.G.; TRBOJEVIC,D.; ZHANG,S.Y.

2001-06-18T23:59:59.000Z

296

2 MW upgrade of the Fermilab Main Injector  

SciTech Connect (OSTI)

In January 2002, the Fermilab Director initiated a design study for a high average power, modest energy proton facility. An intensity upgrade to Fermilab's 120-GeV Main Injector (MI) represents an attractive concept for such a facility, which would leverage existing beam lines and experimental areas and would greatly enhance physics opportunities at Fermilab and in the U.S. With a Proton Driver replacing the present Booster, the beam intensity of the MI is expected to be increased by a factor of five. Accompanied by a shorter cycle, the beam power would reach 2 MW. This would make the MI a more powerful machine than the SNS or the J-PARC. Moreover, the high beam energy (120 GeV) and tunable energy range (8-120 GeV) would make it a unique high power proton facility. The upgrade study has been completed and published. This paper gives a summary report.

Weiren Chou

2003-06-04T23:59:59.000Z

297

Federal Finance Facilities Available for Energy Efficiency Upgrades  

Broader source: Energy.gov (indexed) [DOE]

Finance Facilities Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment A Guide for State, Local & Tribal Leaders and their Partners August 28, 2013 2 Contents 1 Foreword ................................................................................................................................... 5 2 Acknowledgements ................................................................................................................... 6 3 Federal Finance Facilities At-A-Glance ................................................................................... 7 3.1 Matrix of Federal Finance Facilities by Type and Agency .............................................. 7 4 Profiles of Federal Finance Facilities Available for Clean Energy .......................................... 8

298

The upgrade of the ALICE Inner Tracking System  

E-Print Network [OSTI]

ALICE is a general purpose experiment dedicated to the study of nucleus-nucleus collisions at LHC. After more than 3 years of successful operation, an upgrade of the apparatus during the second long shutdown of LHC (LS2) in 2017/18 is in preparation. One of the major goals of the proposed upgrade is to extend the physics reach for rare probes at low transverse momentum. The reconstruction of the rare probes requires a precise determination of the primary and secondary vertices that is performed in ALICE by the Inner Tracking System (ITS). The present ITS made of 6 layers of three technologies of silicon devices allows, for example, to reconstruct D mesons with the transverse momentum down to ~2 GeV/c. Further extension of this range towards lower pT requires the installation of the new ITS consisting of 7 layers of silicon detectors with significantly better single point resolution and reduced material budget. It is expected that the new system will allow to improve the impact parameter resolution by a factor of ~3. Moreover, the data rate capability of the upgraded ITS should be significantly improved in order to exploit the full expected LHC lead-lead interaction rate of 50 kHz, almost two orders of magnitude above the present readout rate. The present contribution describes first the ITS upgrade requirements followed by the conceptual design of the new system and its expected performance. Secondly, an overview of the different R&D activities from the concept towards the final detector is given.

Serhiy Senyukov for the ALICE-ITS collaboration

2013-04-04T23:59:59.000Z

299

Plasma diagnostics for the DIII?D divertor upgrade (abstract)  

Science Journals Connector (OSTI)

The DIII?D tokamak is being upgraded to allow for divertor biasing baffling and pumping experiments. This paper gives an overview of the new diagnostics added to DIII?D as part of this advanced divertor program. They include tile current monitors fast reciprocating Langmuir probes a fixed probe array in the divertor fast neutral pressure gauges and H? measurements with TV cameras and fiber optics coupled to a high?resolution spectrometer.

D. N. Hill; A. Futch; D. Buchenauer; R. Doerner; R. Lehmer; L. Schmitz; C. C. Klepper; M. Menon; B. Leikind; S. Lippmann; M. A. Mahdavi; M. Schaffer; J. Smith; J. Salmonson; J. Watkins

1990-01-01T23:59:59.000Z

300

Plasma diagnostics for the DIII?D divertor upgrade  

Science Journals Connector (OSTI)

The DIII?D tokamak is being upgraded to allow for divertor biasing baffling and pumping experiments. This paper gives an overview of the new diagnostics added to DIII?D as part of this advanced divertor program. They include tile current monitors fast reciprocating Langmuir probes a fixed probe array in the divertor fast neutral pressure gauges and H?measurements with TV cameras and fiber optics coupled to a high?resolution spectrometer.

D. N. Hill; A. Futch; D. Buchenauer; R. Doerner; R. Lehmer; L. Schmitz; C. C. Klepper; M. Menon; B. Leikind; S. Lippmann; M. A. Mahdavi; M. Schaffer; J. Smith; J. Salmonson; J. Watkins

1990-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "rock grounding upgrades" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Plasma diagnostics for the DIII-D divertor upgrade  

SciTech Connect (OSTI)

The DIII-D tokamak is being upgraded to allow for divertor biasing, baffling, and pumping experiments. This paper gives an overview of the new diagnostics added to DIII-D as part of this Advanced Divertor Program. They include tile current monitors, fast reciprocating Langmuir probes, a fixed probe array in the divertor, fast neutral pressure gauges, and H{sub {alpha}} measurements with TV cameras and fiber optics coupled to a high resolution spectrometer. 9 refs.

Hill, D.N.; Futch, A. (Lawrence Livermore National Lab., CA (USA)); Buchenauer, D. (Sandia National Labs., Livermore, CA (USA)); Doerner, R.; Lehmer, R.; Schmitz, L. (California Univ., Los Angeles, CA (USA)); Klepper, C.C.; Menon, M. (Oak Ridge National Lab., TN (USA)); Leikind, B.; Lippmann, S.; Mahdavi, M.A.; Schaffer, M.; Smith, J. (General Atomics, San Diego, CA (USA)); Salmonson, J.; Watkins, J. (San

1990-10-01T23:59:59.000Z

302

Plasma diagnostics for the DIII-D divertor upgrade  

SciTech Connect (OSTI)

The DIII-D tokamak is being upgraded to allow for divertor biasing, baffling, and pumping experiments. This paper gives an overview of the new diagnostics added to DIII-D as part of this advanced divertor program. They include tile current monitors, fast reciprocating Langmuir probes, a fixed probe array in the divertor, fast neutral pressure gauges, and H{sub {alpha}} measurements with TV cameras and fiber optics coupled to a high-resolution spectrometer.

Hill, D.N.; Futch, A. (Lawrence Livermore National Laboratory, Livermore, CA (USA)); Buchenauer, D. (Sandia National Laboratory, Livermore, CA (USA)); Doerner, R.; Lehmer, R.; Schmitz, L. (University of California, Los Angeles, CA (USA)); Klepper, C.C.; Menon, M. (Oak Ridge National Laboratory, Oak Ridge, TN (USA)); Leikind, B.; Lippmann, S.; Mahdavi, M.A.; Schaffer, M.; Smith, J. (General Atomics, San Diego, CA (USA)); Salmonson, J.; Watkins, J. (Sandia National Laboratory, Albuquerque, NM (USA))

1990-11-01T23:59:59.000Z

303

Plasma diagnostics for the DIII-D divertor upgrade (abstract)  

SciTech Connect (OSTI)

The DIII-D tokamak is being upgraded to allow for divertor biasing, baffling, and pumping experiments. This paper gives an overview of the new diagnostics added to DIII-D as part of this advanced divertor program. They include tile current monitors, fast reciprocating Langmuir probes, a fixed probe array in the divertor, fast neutral pressure gauges, and H{sub {alpha}} measurements with TV cameras and fiber optics coupled to a high-resolution spectrometer.

Hill, D.N.; Futch, A. (Lawrence Livermore National Laboratory, Livermore, CA (USA)); Buchenauer, D. (Sandia National Laboratory, Livermore, CA (USA)); Doerner, R.; Lehmer, R.; Schmitz, L. (University of California, Los Angeles, CA (USA)); Klepper, C.C.; Menon, M. (Oak Ridge National Laboratory, Oak Ridge, TN (USA)); Leikind, B.; Lippmann, S.; Mahdavi, M.A.; Schaffer, M.; Smith, J. (General Atomics, San Diego, CA (USA)); Salmonson, J.; Watkins, J. (Sandia National Laboratory, Albuquerque, NM (USA))

1990-10-01T23:59:59.000Z

304

Providing protection: Agencies receive funding to repair, upgrade dams  

E-Print Network [OSTI]

Story by Kathy Wythe tx H2O | pg. 26 Providing protection Agencies receive funding to repair, upgrade dams along with local partners, can apply for grant funds, he said. Construction of the dams began through four federal authorizations... totaling about $11 million. Of the 343 dams currently classified as high hazard, Scattered across Texas are almost 2,000 nondescript, earthen dams built on private land to protect property, roads, and bridges from flood damages. Some of these dams...

Wythe, Kathy

2009-01-01T23:59:59.000Z

305

High temperature ceramic membrane reactors for coal liquid upgrading  

SciTech Connect (OSTI)

Membrane reactors are today finding extensive applications for gas and vapor phase catalytic reactions (see discussion in the introduction and recent reviews by Armor [92], Hsieh [93] and Tsotsis et al. [941]). There have not been any published reports, however, of their use in high pressure and temperature liquid-phase applications. The idea to apply membrane reactor technology to coal liquid upgrading has resulted from a series of experimental investigations by our group of petroleum and coal asphaltene transport through model membranes. Coal liquids contain polycyclic aromatic compounds, which not only present potential difficulties in upgrading, storage and coprocessing, but are also bioactive. Direct coal liquefaction is perceived today as a two-stage process, which involves a first stage of thermal (or catalytic) dissolution of coal, followed by a second stage, in which the resulting products of the first stage are catalytically upgraded. Even in the presence of hydrogen, the oil products of the second stage are thought to equilibrate with the heavier (asphaltenic and preasphaltenic) components found in the feedstream. The possibility exists for this smaller molecular fraction to recondense with the unreacted heavy components and form even heavier undesirable components like char and coke. One way to diminish these regressive reactions is to selectively remove these smaller molecular weight fractions once they are formed and prior to recondensation. This can, at least in principle, be accomplished through the use of high temperature membrane reactors, using ceramic membranes which are permselective for the desired products of the coal liquid upgrading process. An additional incentive to do so is in order to eliminate the further hydrogenation and hydrocracking of liquid products to undesirable light gases.

Tsotsis, T.T. (University of Southern California, Los Angeles, CA (United States). Dept. of Chemical Engineering); Liu, P.K.T. (Aluminum Co. of America, Pittsburgh, PA (United States)); Webster, I.A. (Unocal Corp., Los Angeles, CA (United States))

1992-01-01T23:59:59.000Z

306

High temperature ceramic membrane reactors for coal liquid upgrading  

SciTech Connect (OSTI)

In this project we will study a novel process concept, i.e., the use of ceramic membrane reactors in upgrading of coal model compounds and coal derived liquids. In general terms, the USC research team is responsible for constructing and operating the membrane reactor apparatus and for testing various inorganic membranes for the upgrading of coal derived asphaltenes and coal model compounds. The USC effort will involve the principal investigator of this project and two graduate research assistants. The ALCOA team is responsible for the preparation of the inorganic membranes, for construction and testing of the ceramic membrane modules, and for measurement of their transport properties. The ALCOA research effort will involve Dr. Paul K. T. Liu, who is the project manager of the ALCOA research team, an engineer and a technician. UNOCAL's contribution will be limited to overall technical assistance in catalyst preparation and the operation of the laboratory upgrading membrane reactor and for analytical back-up and expertise in oil analysis and materials characterization. UNOCAL is a no-cost contractor but will be involved in all aspects of the project, as deemed appropriate.

Tsotsis, T.T.

1992-01-01T23:59:59.000Z

307

UPGRADING METHANE USING ULTRA-FAST THERMAL SWING ADSORPTION  

SciTech Connect (OSTI)

The purpose of this project is to design and demonstrate an approach to upgrade low-BTU methane streams from coal mines to pipeline-quality natural gas. The objective of Phase I of the project was to assess the feasibility of upgrading low-Btu methane streams using ultra-fast thermal swing adsorption (TSA) using Velocys' modular microchannel process technology. The project is on schedule and under budget. For Task 1.1, the open literature, patent information, and vendor contacts were surveyed to identify adsorbent candidates for experimental validation and subsequent demonstration in an MPT-based ultra-fast TSA separation for methane upgrading. The leading candidates for preferential adsorption of methane over nitrogen are highly microporous carbons. A Molecular Gate{trademark} zeolite from Engelhard Corporation has emerged as a candidate. For Task 1.2, experimental evaluation of adsorbents was initiated, and data were collected on carbon (MGN-101) from PICA, Inc. This carbon demonstrated a preferential capacity for methane over nitrogen, as well as a reasonable thermal swing differential capacity for a 90% methane and 10% nitrogen mixture. A similar methane swing capacity at 2 psig was measured. The mixture composition is relevant because gob gas contains nearly 85% methane and must be purified to 97% methane for pipeline quality.

Anna Lee Tonkovich

2004-01-01T23:59:59.000Z

308

Eagle Rock Geothermal Facility | Open Energy Information  

Open Energy Info (EERE)

Eagle Rock Geothermal Facility Eagle Rock Geothermal Facility Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Eagle Rock Geothermal Facility General Information Name Eagle Rock Geothermal Facility Facility Eagle Rock Sector Geothermal energy Location Information Location The Geysers, California Coordinates 38.826770222484°, -122.80002593994° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.826770222484,"lon":-122.80002593994,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

309

Definition: Rock Sampling | Open Energy Information  

Open Energy Info (EERE)

Sampling Sampling Jump to: navigation, search Dictionary.png Rock Sampling Systematic rock sampling can be used to characterize a geothermal reservoir. The physical and chemical properties of rock samples provide important information for determining whether a power generation or heat utilization facility can be developed. Some general rock properties can be measured by visual inspection, but detailed properties require laboratory techniques. View on Wikipedia Wikipedia Definition A core sample is a cylindrical section of (usually) a naturally occurring substance. Most core samples are obtained by drilling with special drills into the substance, for example sediment or rock, with a hollow steel tube called a core drill. The hole made for the core sample is called the "core hole". A variety of core samplers exist to sample

310

Mechanical defradation of Emplacement Drifts at Yucca Mountain- A Modeling Case Study. Part I: Nonlithophysal Rock  

SciTech Connect (OSTI)

This paper outlines rock mechanics investigations associated with mechanical degradation of planned emplacement drifts at Yucca Mountain, which is the designated site for the proposed U.S. high-level nuclear waste repository. The factors leading to drift degradation include stresses from the overburden, stresses induced by the heat released from the emplaced waste, stresses due to seismically related ground motions, and time-dependent strength degradation. The welded tuff emplacement horizon consists of two groups of rock with distinct engineering properties: nonlithophysal units and lithophysal units, based on the relative proportion of lithophysal cavities. The term 'lithophysal' refers to hollow, bubble like cavities in volcanic rock that are surrounded by a porous rim formed by fine-grained alkali feldspar, quartz, and other minerals. Lithophysae are typically a few centimeters to a few decimeters in diameter. Part I of the paper concentrates on the generally hard, strong, and fractured nonlithophysal rock. The degradation behavior of the tunnels in the nonlithophysal rock is controlled by the occurrence of keyblocks. A statistically equivalent fracture model was generated based on extensive underground fracture mapping data from the Exploratory Studies Facility at Yucca Mountain. Three-dimensional distinct block analyses, generated with the fracture patterns randomly selected from the fracture model, were developed with the consideration of in situ, thermal, and seismic loads. In this study, field data, laboratory data, and numerical analyses are well integrated to provide a solution for the unique problem of modeling drift degradation.

M. Lin; D. Kicker; B. Damjanac; M. Board; M. Karakouzian

2006-07-05T23:59:59.000Z

311

The LOFT Ground Segment  

E-Print Network [OSTI]

LOFT, the Large Observatory For X-ray Timing, was one of the ESA M3 mission candidates that completed their assessment phase at the end of 2013. LOFT is equipped with two instruments, the Large Area Detector (LAD) and the Wide Field Monitor (WFM). The LAD performs pointed observations of several targets per orbit (~90 minutes), providing roughly ~80 GB of proprietary data per day (the proprietary period will be 12 months). The WFM continuously monitors about 1/3 of the sky at a time and provides data for about ~100 sources a day, resulting in a total of ~20 GB of additional telemetry. The LOFT Burst alert System additionally identifies on-board bright impulsive events (e.g., Gamma-ray Bursts, GRBs) and broadcasts the corresponding position and trigger time to the ground using a dedicated system of ~15 VHF receivers. All WFM data are planned to be made public immediately. In this contribution we summarize the planned organization of the LOFT ground segment (GS), as established in the mission Yellow Book 1 . We...

Bozzo, E; Argan, A; Barret, D; Binko, P; Brandt, S; Cavazzuti, E; Courvoisier, T; Herder, J W den; Feroci, M; Ferrigno, C; Giommi, P; Götz, D; Guy, L; Hernanz, M; Zand, J J M in't; Klochkov, D; Kuulkers, E; Motch, C; Lumb, D; Papitto, A; Pittori, C; Rohlfs, R; Santangelo, A; Schmid, C; Schwope, A D; Smith, P J; Webb, N A; Wilms, J; Zane, S

2014-01-01T23:59:59.000Z

312

Microsoft Word - CF-Radio-Comm-Upgrades-CX.doc  

Broader source: Energy.gov (indexed) [DOE]

include construction of 25-foot tall radio towers and antenna systems within each of the BPA substations listed above. All of the proposed ground disturbing activities would take...

313

NIST Releases Test Framework for Upgrading of Smart Meters | Department of  

Broader source: Energy.gov (indexed) [DOE]

NIST Releases Test Framework for Upgrading of Smart Meters NIST Releases Test Framework for Upgrading of Smart Meters NIST Releases Test Framework for Upgrading of Smart Meters July 12, 2012 - 10:46am Addthis The National Institute of Standards and Technology (NIST) has released a draft set of guidelines that will help utilities test their procedures for upgrading their smart meters securely from a remote location and determine whether their procedures conform with the National Electrical Manufacturers Association (NEMA) Standard for Smart Grid Upgradeability. Available now for public comment, the Advanced Metering Infrastructure Smart Meter Upgradeability Test Framework includes test procedures and detailed steps for conducting the test, reviewing results, and producing records to assess and report on these results.

314

Slick Rock Archived Soil & Groundwater Master Reports | Department...  

Office of Environmental Management (EM)

Soil & Groundwater Master Reports Slick Rock - Old North Continent Slick Rock - Union Carbide More Documents & Publications South Valley Archived Soil & Groundwater Master Reports...

315

Ground potential rise monitor  

DOE Patents [OSTI]

A device and method for detecting ground potential rise (GPR) comprising positioning a first electrode and a second electrode at a distance from each other into the earth. The voltage of the first electrode and second electrode is attenuated by an attenuation factor creating an attenuated voltage. The true RMS voltage of the attenuated voltage is determined creating an attenuated true RMS voltage. The attenuated true RMS voltage is then multiplied by the attenuation factor creating a calculated true RMS voltage. If the calculated true RMS voltage is greater than a first predetermined voltage threshold, a first alarm is enabled at a local location. If user input is received at a remote location acknowledging the first alarm, a first alarm acknowledgment signal is transmitted. The first alarm acknowledgment signal is then received at which time the first alarm is disabled.

Allen, Zachery W. (Mandan, ND); Zevenbergen, Gary A. (Arvada, CO)

2012-04-03T23:59:59.000Z

316

E-Print Network 3.0 - asdex upgrade results Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

system... , Germany Abstract ASDEX Upgrade, an experimental tokamak device for nuclear fusion research, requires... , commissioned such an experimental device, called ASDEX...

317

What's Working in Residential Energy Efficiency Upgrade Programs Workshop, May 2011  

Broader source: Energy.gov [DOE]

On May 20, 2011, the Better Buildings Neighborhood Program held the What's Working in Residential Energy Efficiency Upgrade Programs workshop. Better Buildings hosted the workshop in collaboration...

318

Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment  

Broader source: Energy.gov [DOE]

This presentation, given through the DOE's Technical Assitance Program (TAP), provides information on Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment.

319

Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment  

Broader source: Energy.gov [DOE]

The Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment resource guide lists the various federal financing programs for which energy efficiency and clean...

320

Upgrading of heavy oil from the San Joaquin valley of California by aqueous pyrolysis  

SciTech Connect (OSTI)

Midway Sunset crude oil and well-head oil were treated at elevated temperatures in a closed system with the presence of water. Mild to moderate upgrading, as measured by increasing in API gravity, was observed at 400 C or above. Reduced pressure operation exhibited upgrading activity comparable to upgrading under normal aqueous pyrolysis conditions. Reduced pressure operation was obtained by the use of specific blending methods, a surfactant, and the proper amount of water. The use of metal complexes provided additional upgrading. The best of the minimum set tested was Co(II) 2-ethylhexanoate. Fe, Zn, Mo, Cu, and Ni complexes also showed some levels of activity.

Reynolds, J.G.; Murray, A.M.; Nuxoll, E.V.; Fox, G.A.; Thorsness, C.B. [Lawrence Livermore National Lab., CA (United States); Khan, M.R. [Texaco R and D, Beacon, NY (United States)

1997-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "rock grounding upgrades" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Microsoft Word - CX-WallaWalla-Pendleton-Upgrade_FY14_WEB.docx  

Broader source: Energy.gov (indexed) [DOE]

3 REPLY TO ATTN OF: KEPRPasco SUBJECT: Environmental Clearance Memorandum Greg Wilfong Lineman Foreman III - TFPF-PASCO Proposed Action: Line upgrade on Bonneville Power...

322

Performance of the upgraded LBNL AECR ion source  

SciTech Connect (OSTI)

The LBNL AECR ion source has been upgraded in July 1996 by increasing its magnetic fields to improve its plasma confinement and thereby enhance the source performance. After a few months of tailoring the magnetic field configuration to match the two-frequency plasma heating (14 and 10 GHz), the upgraded AECR ion source (AECR-U) with its higher magnetic fields and higher magnetic mirror ratios has demonstrated significantly enhanced performance. For heavy ions at intensity of about 1 e{mu}A, the charge state was shifted from 42+ to 48+ for uranium and from 41+ to 46+ for bismuth. An order of magnitude enhancement for fully stripped argon ions (I {ge} 60 enA) also has been achieved. Hydrogen-like krypton ions at intensity of about 10{sup 5} pps were extracted from the source and confirmed by measuring its characteristic x-ray with a SiLi crystal detector. High charge state heavy ion beams of xenon-136 and uranium-238 produced with the AECR-U ion source were accelerated by the 88-Inch Cyclotron. Despite poor transmission for the highly charged heavy ions due to vacuum losses in the cyclotron, 11 MeV/nucleon {sup 136}Xe{sup 41+} at 1 x 10{sup 7} pps, 13 MeV/nucleon {sup 136}Xe{sup 46+} at a few hundred pps, and 7 MeV/nucleon {sup 238}U{sup 55+} at 3 x 10{sup 4} pps and 8 MeV/nucleon {sup 238}U{sup 60+} at a few pps were confirmed with a crystal energy detector after extraction from the cyclotron. The total energy of 1.935 GeV of the extracted {sup 238}U{sup 60+} ions is the highest energy ever produced by the 88-Inch Cyclotron. Detailed optimization of the AECR Upgrade will be presented in this paper.

Xie, Z.Q.; Lyneis, C.M.

1997-02-01T23:59:59.000Z

323

Framework TDR for the LHCb Upgrade Technical Design Report  

E-Print Network [OSTI]

This document is a Framework Technical Design Report for the upgrade of the LHCb experiment. It adds to the information in the Letter of Intent, in particular concerning the foreseen schedule, cost and participating institutes. Updates are given for the physics performance, based on the experience gained with the first full year of data taking, on the detector requirements and the progress of the sub-system R&D. Within the framework presented here, it is expected that the individual sub-system TDRs will follow on completion of the R&D phase in the next year.

Bediaga, I; Ferreira Rodrigues, F; Magnin, J; Massafferri, A; Nasteva, I; dos Reis, A C; Amato, S; Carvalho Akiba, K; De Paula, L; Francisco, O; Gandelman, M; Gomes, A; Lopes, J H; Otalora Goicochea, J M; Polycarpo, E; Rangel, M S; Souza De Paula, B; Vieira, D; Göbel, C; Molina Rodriguez, J; Chen, P; Gao, Y; Gong, G; Gong, H; Jing, F; Li, L; Li, Y; Liu, B; Lu, H; Shao, B; Wu, S; Xue, T; Yang, Z; Yuan, X; Zeng, M; Zhang, F; Zhang, Y; Zhong, L; De Bonis, I; Decamp, D; Drancourt, C; Ghez, Ph; Hopchev, P; Lees, J -P; Machikhiliyan, I V; Minard, M -N; Pietrzyk, B; T'Jampens, S; Tisserand, V; Tournefier, E; Vouters, G; Ajaltouni, Z; Chanal, H; Cogneras, E; Deschamps, O; El Rifai, I; Henrard, P; Hoballah, M; Jahjah Hussein, M; Lefèvre, R; Li Gioi, L; Monteil, S; Niess, V; Perret, P; Roa Romero, D A; Sobczak, K; Adrover, C; Aslanides, E; Cachemiche, J -P; Cogan, J; Duval, P -Y; Hachon, F; Khanji, B; Le Gac, R; Leroy, O; Mancinelli, G; Maurice, E; Perrin-Terrin, M; Rethore, F; Sapunov, M; Serrano, J; Tsaregorodtsev, A; Barsuk, S; Beigbeder-Beau, C; Cacérès, T; Callot, O; Charlet, D; Duarte, O; He, J; Jean-Marie, B; Kochebina, O; Lefrançois, J; Machefert, F; Martín Sánchez, A; Nicol, M; Robbe, P; Schune, M -H; Teklishyn, M; Tocut, V; Viaud, B; Videau, I; Ben-Haim, E; Benayoun, M; David, P; Del Buono, L; Martens, A; Polci, F; Brambach, T; Cauet, Ch; Deckenhoff, M; Domke, M; Ekelhof, R; Kaballo, M; Karbach, T M; Kruse, F; Merkel, J; Rudloff, K; Schleich, S; Schlupp, M; Spaan, B; Swientek, S; Warda, K; Wishahi, J; Bauer, C; Britsch, M; Föhr, C; Fontana, M; Fuchs, H; Hofmann, W; Kihm, T; Popov, D; Schmelling, M; Volyanskyy, D; Voss, H; Zavertyaev, M; Bachmann, S; Bien, A; Blouw, J; Dordei, F; Färber, C; Gersabeck, E; Hansmann-Menzemer, S; Jaeger, A; Kreplin, K; Krocker, G; Linn, C; Marks, J; Meissner, M; Nikodem, T; Seyfert, P; Stahl, S; van Tilburg, J; Uwer, U; Wandernoth, S; Wiedner, D; Zhelezov, A; Grünberg, O; Hartmann, T; Voß, C; Waldi, R; Bifani, S; Farry, S; Ilten, P; Kechadi, T; Mathe, Z; McNulty, R; Wallace, R; Zhang, W C; Milanes, D A; Palano, A; Carbone, A; D'Antone, I; Derkach, D; Falabella, A; Galli, D; Lax, I; Marconi, U; Perazzini, S; Vagnoni, V; Valenti, G; Zangoli, M; Bonivento, W; Cadeddu, S; Cardini, A; Lai, A; Manca, G; Oldeman, R; Saitta, B; Baldini, W; Bozzi, C; Evangelisti, F; Landi, L; Mazurov, A; Savrie, M; Squerzanti, S; Vecchi, S; Bizzeti, A; Frosini, M; Graziani, G; Passaleva, G; Veltri, M; Anelli, M; Archilli, F; Bencivenni, G; Campana, P; Ciambrone, P; De Simone, P; Felici, G; Lanfranchi, G; Palutan, M; Saputi, A; Sarti, A; Sciascia, B; Soomro, F; Cardinale, R; Fontanelli, F; Patrignani, C; Petrolini, A; Calvi, M; Furcas, S; Giachero, A; Gotti, C; Kucharczyk, M; Maino, M; Matteuzzi, C; Pessina, G; Carboni, G; De Capua, S; Sabatino, G; Santovetti, E; Satta, A; Alves Jr, A A; Auriemma, G; Bocci, V; Martellotti, G; Penso, G; Pinci, D; Santacesaria, R; Satriano, C; Sciubba, A; Nisar, S; Morawski, P; Polok, G; Witek, M; Muryn, B; Oblakowska-Mucha, A; Senderowska, K; Szumlak, T; Guzik, Z; Nawrot, A; Szczekowski, M; Ukleja, A; Burducea, I; Coca, C; Dogaru, M; Grecu, A; Maciuc, F; Muresan, R; Orlandea, M; Pavel-Nicorescu, C; Popovici, B; Stoica, S; Straticiuc, M; Teodorescu, E; Alkhazov, G; Bochin, B; Bondar, N; Dzyuba, A; Gets, S; Golovtsov, V; Kashchuk, A; Maev, O; Matveev, M; Sagidova, N; Shcheglov, Y; Volkov, S; Vorobyev, A; Balagura, V; Belogurov, S; Belyaev, I; Egorychev, V; Golubkov, D; Kvaratskheliya, T; Savrina, D; Semennikov, A; Shatalov, P; Shevchenko, V; Zhokhov, A; Berezhnoy, A; Bogdanova, G; Komarov, I; Korolev, M; Leflat, A; Nikitin, N; Volkov, V; Zverev, E; Filippov, S; Gushchin, E; Karavichev, O; Kravchuk, L; Kudenko, Y; Laptev, S; Tikhonov, A; Bondar, A; Eidelman, S; Krokovny, P; Kudryavtsev, V; Shekhtman, L; Vorobyev, V; Artamonov, A; Belous, K; Dzhelyadin, R; Guz, Yu; Novoselov, A; Obraztsov, V; Ostankov, A; Romanovsky, V; Shapkin, M; Stenyakin, O; Yushchenko, O; Abellan Beteta, C; Calvo Gomez, M; Camboni, A; Casajus Ramo, A; Comerma-Montells, A; Domingo Bonal, F; Garrido, L; Gascon, D; Grabalosa Gándara, M; Graciani Diaz, R; Graugés, E; Lopez Asamar, E; Mauricio, J; Mendez-Munoz, V; Pérez-Calero Yzquierdo, A; Picatoste Olloqui, E; Pie Valls, B; Potterat, C; Puig Navarro, A; Rosello, M; Ruiz, H; Vazquez Gomez, R; Vilasis-Cardona, X; Adeva, B; Alvarez Cartelle, P; Cid Vidal, X; Dosil Suárez, A; Esperante Pereira, D; Fernandez Albor, V; Gallas Torreira, A; Hernando Morata, J A; Pazos Alvarez, A; Perez Trigo, E; Plo Casasus, M; Rodriguez Perez, P; Saborido Silva, J J; Sanmartin Sedes, B; Santamarina Rios, C; Seco, M; Vazquez Regueiro, P; Visniakov, J; Albrecht, J; Alessio, F; Barschel, C; Blake, T; Bonaccorsi, E; Brarda, L; Buytaert, J; Cattaneo, M; Chadaj, B; Charpentier, Ph; Chebbi, M; Ciba, K; Clemencic, M

2012-01-01T23:59:59.000Z

324

Rock-Water Interactions In Hot Dry Rock Geothermal Systems- Field  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Rock-Water Interactions In Hot Dry Rock Geothermal Systems- Field Investigations Of In Situ Geochemical Behavior Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Journal Article: Rock-Water Interactions In Hot Dry Rock Geothermal Systems- Field Investigations Of In Situ Geochemical Behavior Details Activities (5) Areas (2) Regions (0) Abstract: Two hot dry rock (HDR) geothermal energy reservoirs have been created by hydraulic fracturing of Precambrian granitic rock between two wells on the west flank of the Valles Caldera in the Jemez Mountains of northern New Mexico. Heat is extracted by injecting water into one well,

325

Rock of Ages | Open Energy Information  

Open Energy Info (EERE)

of Ages of Ages Jump to: navigation, search Name Rock of Ages Facility Rock of Ages Sector Wind energy Facility Type Small Scale Wind Facility Status In Service Owner Rock of Ages Energy Purchaser Rock of Ages Location Graniteville VT Coordinates 44.14668574°, -72.48180896° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.14668574,"lon":-72.48180896,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

326

Definition: Isotopic Analysis- Rock | Open Energy Information  

Open Energy Info (EERE)

Isotopic Analysis- Rock Isotopic Analysis- Rock Jump to: navigation, search Dictionary.png Isotopic Analysis- Rock Isotopes are atoms of the same element that have different numbers of neutrons. An isotopic analysis looks at a particular isotopic element(s) in a given system, while the conditions which increase/decrease the number of neutrons are well understood and measurable.[1] View on Wikipedia Wikipedia Definition References ↑ http://wwwrcamnl.wr.usgs.gov/isoig/isopubs/itchch2.html Ret LikeLike UnlikeLike You like this.Sign Up to see what your friends like. rieved from "http://en.openei.org/w/index.php?title=Definition:Isotopic_Analysis-_Rock&oldid=687702" Category: Definitions What links here Related changes Special pages Printable version Permanent link Browse properties

327

Thermophysical properties of the Po Basin rocks  

Science Journals Connector (OSTI)

......7 per cent. 4.2.2 Anisotropic rocks Anisotropy of shales, silty shales and siltstones...dolomites). Horizons of shales, silty shales and siltstones are present...the presence of thermally anisotropic sheet silicates, note that......

V. Pasquale; G. Gola; P. Chiozzi; M. Verdoya

2011-07-01T23:59:59.000Z

328

Winner: Hot Rocks | Department of Energy  

Energy Savers [EERE]

a catch. Only a couple of EGS projects have ever produced power, and those are in Germany and France, where the rock is considerably more pliant than Australia's granite...

329

BUILDOUT AND UPGRADE OF CENTRAL EMERGENCY GENERATOR SYSTEM, GENERATOR 3 AND 4 ELECTRICAL INSTALLATION  

SciTech Connect (OSTI)

SECTION 01000—SUMMARY OF WORK PART 1—GENERAL 1.1 SUMMARY The work to be performed under this project consists of providing the labor, equipment, and materials to perform "Buildout and Upgrade of Central Emergency Generator System, Generator 3 and 4 Electrical Installation" for the National Aeronautics and Space Administration at the Dryden Flight Research Center (NASA/DFRC), Edwards, California 93523. All modifications to existing substations and electrical distribution systems are the responsibility of the contractor. It is the contractor’s responsibility to supply a complete and functionally operational system. The work shall be performed in accordance with these specifications and the related drawings. The work of this project is defined by the plans and specifications contained and referenced herein. This work specifically includes but is not limited to the following: Scope of Work - Installation 1. Install all electrical wiring and controls for new generators 3 and 4 to match existing electrical installation for generators 1 and 2 and in accordance with drawings. Contractor shall provide as-built details for electrical installation. 2. Install battery charger systems for new generators 3 and 4 to match existing battery charging equipment and installation for generators 1 and 2. This may require exchange of some battery charger parts already on-hand. Supply power to new battery chargers from panel and breakers as shown on drawings. Utilize existing conduits already routed to generators 3 and 4 to field route the new wiring in the most reasonable way possible. 3. Install electrical wiring for fuel/lube systems for new generators 3 and 4 to match existing installation for generators 1 and 2. Supply power to lube oil heaters and fuel system (day tanks) from panel and breakers as shown on drawings. Utilize existing conduits already routed to generators 3 and 4 to field route the new wiring in the most reasonable way possible. Add any conduits necessary to complete wiring to fuel systems. 4. Install power to new dampers/louvers from panel and breakers as shown on drawings. Wiring shall be similar to installation to existing dampers/louvers. Utilize existing conduits already routed to louver areas to field route the new wiring in the most reasonable way possible. Add any conduits necessary to complete wiring to new dampers/louvers. 5. Install power to jacket water heaters for new generators 3 and 4 from panel and breakers as shown on drawings. Utilize existing conduits already routed to generators 3 and 4 to field route the new wiring in the most reasonable way possible. 6. Install new neutral grounding resistor and associated parts and wiring for new generators 3 and 4 to match existing installation for generators 1 and 2. Grounding resistors will be Government Furnished Equipment (GFE). 7. Install two new switchgear sections, one for generator #3 and one for generator #4, to match existing generator #1 cubicle design and installation and in accordance with drawings and existing parts lists. This switchgear will be provided as GFE. 8. Ground all new switchgear, generators 3 and 4, and any other new equipment to match existing grounding connections for generators 1 and 2, switchgear and other equipment. See drawings for additional details. Grounding grid is already existing. Ensure that all grounding meets National Electrical Code requirements. 9. Cummins DMC control for the generator and switchgear syste

Gary D. Seifert; G. Shawn West; Kurt S. Myers; Jim Moncur

2006-07-01T23:59:59.000Z

330

RF Power Upgrade for CEBAF at Jefferson Laboratory  

SciTech Connect (OSTI)

Jefferson Laboratory (JLab) is currently upgrading the 6GeV Continuous Electron Beam Accelerator Facility (CEBAF) to 12GeV. As part of the upgrade, RF systems will be added, bringing the total from 340 to 420. Existing RF systems can provide up to 6.5 kW of CW RF at 1497 MHZ. The 80 new systems will provide increased RF power of up to 13 kW CW each. Built around a newly designed and higher efficiency 13 kW klystron developed for JLab by L-3 Communications, each new RF chain is a completely revamped system using hardware different than our present installations. This paper will discuss the main components of the new systems including the 13 kW klystron, waveguide isolator, and HV power supply using switch-mode technology. Methodology for selection of the various components and results of initial testing will also be addressed. Notice: Authored by Jefferson Science Associates, LLC under U.S. DOE Contract No. DE-AC05-06OR23177. The U.S. Government retains a non-exclusive, paid-up, irrevocable, world-wide license to publish or reproduce this manuscript for U.S. Government purposes.

Andrew Kimber,Richard Nelson

2011-03-01T23:59:59.000Z

331

Post Retort, Pre Hydro-treat Upgrading of Shale Oil  

SciTech Connect (OSTI)

Various oil feedstocks, including oil from oil shale, bitumen from tar sands, heavy oil, and refin- ery streams were reacted with the alkali metals lithium or sodium in the presence of hydrogen or methane at elevated temperature and pressure in a reactor. The products were liquids with sub- stantially reduced metals, sulfur and nitrogen content. The API gravity typically increased. Sodi- um was found to be more effective than lithium in effectiveness. The solids formed when sodium was utilized contained sodium sulfide which could be regenerated electrochemically back to so- dium and a sulfur product using a "Nasicon", sodium ion conducting membrane. In addition, the process was found to be effective reducing total acid number (TAN) to zero, dramatically reduc- ing the asphaltene content and vacuum residual fraction in the product liquid. The process has promise as a means of eliminating sulfur oxide and carbon monoxide emissions. The process al- so opens the possibility of eliminating the coking process from upgrading schemes and upgrad- ing without using hydrogen.

Gordon, John

2012-09-30T23:59:59.000Z

332

Analysis of NSTX Upgrade OH Magnet and Center Stack  

SciTech Connect (OSTI)

The new ohmic heating (OH) coil and center stack for the National Spherical Torus Experiment (NSTX) upgrade are required to meet cooling and structural requirements for operation at the enhanced 1 Tesla toroidal field and 2 MA plasma current. The OH coil is designed to be cooled in the time between discharges by water flowing in the center of the coil conductor. We performed resistive heating and thermal hydraulic analyses to optimize coolant channel size to keep the coil temperature below 100 C and meet the required 20 minute cooling time. Coupled electromagnetic, thermal and structural FEA analyses were performed to determine if the OH coil meets the requirements of the structural design criteria. Structural response of the OH coil to its self-field and the field from other coils was analyzed. A model was developed to analyze the thermal and electromagnetic interaction of centerstack components such as the OH coil, TF inner legs and the Bellville washer preload mechanism. Torsional loads from the TF interaction with the OH and poloidal fields are transferred through the TF flag extensions via a torque transfer coupling to the rest of the tokamak structure. A 3D FEA analysis was performed to qualify this design. The results of these analyses, which will be presented in this paper, have led to the design of OH coil and centerstack components that meet the requirements of the NSTX-upgrade structural design criteria.

A. Zolfaghari, P. Titus, J. Chrzanowski, A. Salehzadeh, F. Dahlgren

2010-11-30T23:59:59.000Z

333

12 GeV Upgrade Project - Cryomodule Production  

SciTech Connect (OSTI)

The Thomas Jefferson National Accelerator Facility (Jefferson Lab) is producing ten 100+MV SRF cryomodules (C100) as part of the CEBAF 12 GeV Upgrade Project. Once installed, these cryomodules will become part of an integrated accelerator system upgrade that will result in doubling the energy of the CEBAF machine from 6 to 12 GeV. This paper will present a complete overview of the C100 cryomodule production process. The C100 cryomodule was designed to have the major components procured from private industry and assembled together at Jefferson Lab. In addition to measuring the integrated component performance, the performance of the individual components is verified prior to being released for production and assembly into a cryomodule. Following a comprehensive cold acceptance test of all subsystems, the completed C100 cryomodules are installed and commissioned in the CEBAF machine in preparation of accelerator operations. This overview of the cryomodule production process will include all principal performance measurements, acceptance criterion and up to date status of current activities.

J. Hogan, A. Burrill, G.K. Davis, M.A. Drury, M. Wiseman

2012-07-01T23:59:59.000Z

334

Fast wave heating in the NSTX-Upgrade device  

SciTech Connect (OSTI)

NSTX-Upgrade will operate with toroidal magnetic fields (B T) up to 1 T, nearly twice the value used in the experiments on NSTX, and the available NBI power will be doubled. The doubling of B T while retaining the 30 MHz RF source frequency has moved the heating regime from the high harmonic fast wave (HHFW) regime used in NSTX to the mid harmonic fast wave (MHFW) regime. By making use of the full wave code AORSA, this work shows that direct ion damping (mainly by thermal ions localized at the 5th harmonic resonance) might be significant in NSTX-Upgrade under TRANSP predicted full performance conditions and the electron and ion absorption is sensitive to the ratio of electron and ion temperature. Launching at high toroidal wave number appears to be one way to significantly reduce the ion damping. By using the extended AORSA code, which includes a detailed description of the scrape-off layer in the field solutions, we found a large electric field amplitude outside of the last closed flux surface as previously seen in NSTX from AORSA simulations (D. L. Green, et al, Phys. Rev. Lett. 107, 145001 (2011)). Preliminary results by introducing a collision damping in the scrape-off layer in the AORSA code to represent a damping process are presented, showing for the first time absorbed power in the scrape-off layer.

Bertelli, Nicola [Princeton Plasma Physics Laboratory (PPPL); Jaeger, E. F. [XCEL; Berry, Lee Alan [XCEL Engineering Inc., Oak Ridge; Bonoli, P. [Massachusetts Institute of Technology (MIT); Budny, R. V. [Princeton Plasma Physics Laboratory (PPPL); Fu, GuoYong [Princeton Plasma Physics Laboratory (PPPL); Gerhardt, S. [Princeton Plasma Physics Laboratory (PPPL); Green, David L [ORNL; Harvey, R. W. [CompX, Del Mar, CA; Hosea, J. [Princeton Plasma Physics Laboratory (PPPL); Kramer, G. [Princeton Plasma Physics Laboratory (PPPL); LeBlanc, B [Princeton Plasma Physics Laboratory (PPPL); Perkins, R. J. [Princeton Plasma Physics Laboratory (PPPL); Phillips, C. K. [Princeton Plasma Physics Laboratory (PPPL); Ryan, Philip Michael [ORNL; Taylor, G. [Princeton Plasma Physics Laboratory (PPPL); Valeo, E. J. [Princeton Plasma Physics Laboratory (PPPL); Wilson, J. R. [Princeton Plasma Physics Laboratory (PPPL); Wright, J. [Massachusetts Institute of Technology (MIT)

2013-01-01T23:59:59.000Z

335

THERMAL UPGRADING OF 9977 RADIOACTIVE MATERIAL (RAM) TYPE B PACKAGE  

SciTech Connect (OSTI)

The 9977 package is a radioactive material package that was originally certified to ship Heat Sources and RTG contents up to 19 watts and it is now being reviewed to significantly expand its contents in support of additional DOE missions. Thermal upgrading will be accomplished by employing stacked 3013 containers, a 3013 aluminum spacer and an external aluminum sleeve for enhanced heat transfer. The 7th Addendum to the original 9977 package Safety Basis Report describing these modifications is under review for the DOE certification. The analyses described in this paper show that this well-designed and conservatively analyzed package can be upgraded to carry contents with decay heat up to 38 watts with some simple design modifications. The Model 9977 package has been designed as a replacement for the Department of Transportation (DOT) Fissile Specification 6M package. The 9977 package is a very versatile Type B package which is certified to transport and store a wide spectrum of radioactive materials. The package was analyzed quite conservatively to increase its usefulness and store different payload configurations. Its versatility is evident from several daughter packages such as the 9978 and H1700, and several addendums where the payloads have been modified to suit the Shipper's needs without additional testing.

Gupta, N.; Abramczyk, G.

2012-03-26T23:59:59.000Z

336

EPA Final Ground Water Rule  

Broader source: Energy.gov (indexed) [DOE]

Office of Nuclear Safety and Environment Office of Nuclear Safety and Environment Nuclear Safety and Environment Information Brief HS-20-IB-2007-02 (March 2007) EPA Final Ground Water Rule Safe Drinking Water Act: National Primary Drinking Water Regulations Ground Water Rule - 40 CFR Parts 9, 141 and 142 Final Rule: 71 FR 65574 Effective Date: January 8, 2007 1 RULE SYNOPSIS On November 8, 2006, the U.S. Environmental Protection Agency (EPA) published a final Ground Water Rule (GWR) to promote increased protection against microbial pathogens that may be present in public water systems (PWSs) that use ground water sources for their supply (these systems are known as ground water systems). This Rule establishes a risk-targeted approach

337

On LHCb muon MWPC grounding  

E-Print Network [OSTI]

My goal is to study how a big MWPC system, in particular the LHCb muon system, can be protected against unstable operation and multiple spurious hits, produced by incorrect or imperfect grounding in the severe EM environment of the LHCb experiment. A mechanism of penetration of parasitic current from the ground loop to the input of the front-end amplifier is discussed. A new model of the detector cell as the electrical bridge is considered. As shown, unbalance of the bridge makes detector to be sensitive to the noise in ground loop. Resonances in ground loop are specified. Tests of multiple-point and single-point grounding conceptions made on mock-up are presented.

Kashchuk, A

2006-01-01T23:59:59.000Z

338

Boiler Upgrades and Decentralizing Steam Systems Save Water and...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

replacing its central plant with a combination of distributed boilers and ground source heat pumps. The results saved more than 1 million MBtu in energy and 19,574 Kgal of water...

339

Regional analysis of ground and above-ground climate  

SciTech Connect (OSTI)

The regional suitability of underground construction as a climate control technique is discussed with reference to (1) a bioclimatic analysis of long-term weather data for 29 locations in the United States to determine appropriate above ground climate control techniques, (2) a data base of synthesized ground temperatures for the coterminous United States, and (3) monthly dew point ground temperature comparisons for identifying the relative likelihood of condensation from one region to another. It is concluded that the suitability of earth tempering as a practice and of specific earth-sheltered design stereotypes varies geographically; while the subsurface almost always provides a thermal advantage on its own terms when compared to above ground climatic data, it can, nonetheless, compromise the effectiveness of other, regionally more important climate control techniques. Also contained in the report are reviews of above and below ground climate mapping schemes related to human comfort and architectural design, and detailed description of a theoretical model of ground temperature, heat flow, and heat storage in the ground. Strategies of passive climate control are presented in a discussion of the building bioclimatic analysis procedure which has been applied in a computer analysis of 30 years of weather data for each of 29 locations in the United States.

Not Available

1981-12-01T23:59:59.000Z

340

Proactive Price Regulation for Upgrading Telecommunications Infrastructure and Jon M. Peha  

E-Print Network [OSTI]

1 Proactive Price Regulation for Upgrading Telecommunications Infrastructure Qiong Wang 1 and Jon M to which society benefits from an upgrade to a telecommunications network infrastructure depends on when, Infrastructure, Regulation, Telecommunications, Monopoly Information Economics and Policy, Vol. 9, No. 2, June

Peha, Jon M.

Note: This page contains sample records for the topic "rock grounding upgrades" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Application of Carbon Nanocatalysts in Upgrading Heavy Crude Oil Assisted with Microwave Heating  

E-Print Network [OSTI]

Application of Carbon Nanocatalysts in Upgrading Heavy Crude Oil Assisted with Microwave Heating, Stanford, California 94305, United States *S Supporting Information ABSTRACT: Heavy crude oil can that by using carbon nano- catalysts, heavy crude oil can be efficiently upgraded to lighter oil at a relatively

Cui, Yi

342

Upgrading and enhanced recovery of Jobo heavy oil using hydrogen donor under in-situ combustion  

E-Print Network [OSTI]

UPGRADING AND ENHANCED RECOVERY OF JOBO HEAVY OIL USING HYDROGEN DONOR UNDER IN-SITU COMBUSTION A... UPGRADING AND ENHANCED RECOVERY OF JOBO HEAVY OIL USING HYDROGEN DONOR UNDER IN-SITU COMBUSTION A Thesis by SAMIR HUSEYNZADE Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements...

Huseynzade, Samir

2008-10-10T23:59:59.000Z

343

Upgrading and enhanced recovery of Jobo heavy oil using hydrogen donor under in-situ combustion  

E-Print Network [OSTI]

In-situ upgrading of oil using hydrogen donors is a new process. In particular, very little research has been conducted with respect to in-situ oil upgrading using hydrogen donor under in-situ combustion. Several papers describe the use of metal...

Huseynzade, Samir

2009-05-15T23:59:59.000Z

344

Status of the Tandem Mirror Experiment-Upgrade (TMX-U) diagnostic system  

SciTech Connect (OSTI)

This paper presents the current status of the Tandem Mirror Experiment-Upgrade (TMX-U) diagnostics system. For the initial instruments active on TMX-U, the expansions or upgrades that have been implemented are outlined. For the newly added systems, more implementation details are presented.

Coutts, G.W.; Coffield, F.E.; Hornady, R.S.

1983-11-26T23:59:59.000Z

345

Effect of Upgraded Lignite Product Water Content on the Propensity for Spontaneous Ignition  

Science Journals Connector (OSTI)

At the end of 2005, worldwide lignite reserves were 207.4 billion tons and accounted for 17.7% of total coal. ... Therefore, there is still considerable interest in the propensity for spontaneous ignition of upgraded lignites products with different moisture contents and also the recommended water content for upgraded lignite products. ...

Kai Zhang; Changfu You

2012-12-11T23:59:59.000Z

346

PHOTOINJECTED ENERGY RECOVERY LINAC UPGRADE FOR THE NATIONAL SYNCHROTRON LIGHT SOURCE *  

E-Print Network [OSTI]

PHOTOINJECTED ENERGY RECOVERY LINAC UPGRADE FOR THE NATIONAL SYNCHROTRON LIGHT SOURCE * Ilan Ben of the National Synchrotron Light Source (NSLS). This upgrade will be based on the Photoinjected Energy Recovering limitations. First, the emittance of a storage ring based light source is proportional to the energy

Brookhaven National Laboratory

347

Ground motion modeling of Hayward fault scenario earthquakes II:Simulation of long-period and broadband ground motions  

SciTech Connect (OSTI)

We simulate long-period (T > 1.0-2.0 s) and broadband (T > 0.1 s) ground motions for 39 scenarios earthquakes (Mw 6.7-7.2) involving the Hayward, Calaveras, and Rodgers Creek faults. For rupture on the Hayward fault we consider the effects of creep on coseismic slip using two different approaches, both of which reduce the ground motions compared with neglecting the influence of creep. Nevertheless, the scenario earthquakes generate strong shaking throughout the San Francisco Bay area with about 50% of the urban area experiencing MMI VII or greater for the magnitude 7.0 scenario events. Long-period simulations of the 2007 Mw 4.18 Oakland and 2007 Mw 4.5 Alum Rock earthquakes show that the USGS Bay Area Velocity Model version 08.3.0 permits simulation of the amplitude and duration of shaking throughout the San Francisco Bay area, with the greatest accuracy in the Santa Clara Valley (San Jose area). The ground motions exhibit a strong sensitivity to the rupture length (or magnitude), hypocenter (or rupture directivity), and slip distribution. The ground motions display a much weaker sensitivity to the rise time and rupture speed. Peak velocities, peak accelerations, and spectral accelerations from the synthetic broadband ground motions are, on average, slightly higher than the Next Generation Attenuation (NGA) ground-motion prediction equations. We attribute at least some of this difference to the relatively narrow width of the Hayward fault ruptures. The simulations suggest that the Spudich and Chiou (2008) directivity corrections to the NGA relations could be improved by including a dependence on the rupture speed and increasing the areal extent of rupture directivity with period. The simulations also indicate that the NGA relations may under-predict amplification in shallow sedimentary basins.

Aagaard, B T; Graves, R W; Rodgers, A; Brocher, T M; Simpson, R W; Dreger, D; Petersson, N A; Larsen, S C; Ma, S; Jachens, R C

2009-11-04T23:59:59.000Z

348

EA-1321: Proposed Upgrade and Improvement of The National Synchrotron Light  

Broader source: Energy.gov (indexed) [DOE]

21: Proposed Upgrade and Improvement of The National 21: Proposed Upgrade and Improvement of The National Synchrotron Light Source Complex at Brookhaven National Laboratory, Upton, New York EA-1321: Proposed Upgrade and Improvement of The National Synchrotron Light Source Complex at Brookhaven National Laboratory, Upton, New York SUMMARY This EA evaluates the environmental impacts for the proposal to upgrade the facilities of the U.S. Department of Energy's National Synchrotron Light Source Complex, namely the National Synchrotron Light Source, the Accelerator Test Facility and the Source Development Laboratory. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD December 12, 2001 EA-1321: Finding of No Significant Impact Proposed Upgrade and Improvement of The National Synchrotron Light Source

349

Rebates Cut the Price of Big-Time Efficiency Upgrades | Department of  

Broader source: Energy.gov (indexed) [DOE]

Rebates Cut the Price of Big-Time Efficiency Upgrades Rebates Cut the Price of Big-Time Efficiency Upgrades Rebates Cut the Price of Big-Time Efficiency Upgrades February 22, 2010 - 5:52pm Addthis One of the smartest ways for homeowners to save money on major appliance upgrades is to hook into an energy efficiency rebate program. The Neighborhood Energy Connection (NEC), a non-profit organization in St. Paul, Minnesota, helps local residents take advantage of Xcel Energy's rebate programs that cut the cost of whole-house energy efficiency upgrades. It can start with a visit from the "Home Energy Squad", a program offered jointly by Xcel Energy and CenterPoint Energy, the local energy providers (NEC implements the program for Xcel Energy). The Energy Squad installs simple efficiency-improving products such as compact fluorescent

350

Plains & Eastern Clean Line Project Proposal for New or Upgraded  

Broader source: Energy.gov (indexed) [DOE]

Plains & Eastern Clean Line Project Proposal for New or Upgraded Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 (July 2010) Update to Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 (August 2011) More Documents & Publications EIS-0486: Notice of Intent and Notice of Potential Floodplain and Wetland Involvement Notice of Intent To Prepare an Environmental Impact Statement for the

351

Analysis of major risks associated with hydrocarbon storage caverns in bedded salt rock  

Science Journals Connector (OSTI)

Salt rock is internationally accepted as an ideal medium for energy storage. As an energy storage structure, the safety of hydrocarbon storage caverns in salt rock is related to the national economy and to social public security. Risk analysis is an important method of engineering safety evaluation. In this paper the major risks associated with hydrocarbon storage caverns in bedded salt rock are defined. The major risks are classified under the headings of ‘oil and gas leakage’, ‘ground subsidence’, and ‘cavern failure’, and are discussed under these topical titles. The factors leading to the major risks associated with storage caverns are identified by reviewing descriptions of major accidents of salt storage caverns around the world. Fault tree models for the three major risks are established and analyzed. Basic paths of the risk and their occurrence probability ranking are derived. The risk factors which contribute greatly to the risk are identified by calculating the importance degree of all the basic events. Finally, a comprehensive evaluation methodology for major risk loss is generated based on the analytic hierarchy process. This provides a theoretical foundation for the evaluation and prevention of major risks in the construction and operation of storage caverns in bedded salt rock.

Chunhe Yang; Wenjun Jing; J.J.K. Daemen; Guimin Zhang; Chao Du

2013-01-01T23:59:59.000Z

352

Ground Gravity Survey At Clear Lake Area (Skokan, 1993) | Open Energy  

Open Energy Info (EERE)

Ground Gravity Survey At Clear Lake Area (Skokan, 1993) Ground Gravity Survey At Clear Lake Area (Skokan, 1993) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity Survey At Clear Lake Area (Skokan, 1993) Exploration Activity Details Location Clear Lake Area Exploration Technique Ground Gravity Survey Activity Date Usefulness useful DOE-funding Unknown Notes A detailed gravity survey (Isherwood, 1975) was undertaken as a follow-up to a regional gravity survey of the area in order to detail a low in the Clear Lake volcanics. The low (Fig. 5 ) was thought to be caused by an intrusion of molten rock which would be mass deficient. Modeling and interpretation indicated a+K139 chamber-like feature with a radius of approximately 7 km within 7-8 km of the surface. References

353

Exploration of the Equilibrium Operating Space For NSTX-Upgrade  

SciTech Connect (OSTI)

This paper explores a range of high-performance equilibrium scenarios available in the NSTX-Upgrade device [J.E. Menard, submitted for publication to Nuclear Fusion]. NSTX-Upgrade is a substantial upgrade to the existing NSTX device [M. Ono, et al., Nuclear Fusion 40, 557 (2000)], with significantly higher toroidal field and solenoid capabilities, and three additional neutral beam sources with significantly larger current drive efficiency. Equilibria are computed with freeboundary TRANSP, allowing a self consistent calculation of the non-inductive current drive sources, the plasma equilibrium, and poloidal field coil current, using the realistic device geometry. The thermal profiles are taken from a variety of existing NSTX discharges, and different assumptions for the thermal confinement scalings are utilized. The no-wall and idealwall n=1 stability limits are computed with the DCON code. The central and minimum safety factors are quite sensitive to many parameters: they generally increases with large outer plasmawall gaps and higher density, but can have either trend with the confinement enhancement factor. In scenarios with strong central beam current drive, the inclusion of non-classical fast ion diffusion raises qmin, decreases the pressure peaking, and generally improves the global stability, at the expense of a reduction in the non-inductive current drive fraction; cases with less beam current drive are largely insensitive to additional fast ion diffusion. The non-inductive current level is quite sensitive to the underlying confinement and profile assumptions. For instance, for BT=1.0 T and Pinj=12.6 MW, the non-inductive current level varies from 875 kA with ITER-98y,2 thermal confinement scaling and narrow thermal profiles to 1325 kA for an ST specific scaling expression and broad profiles. This sensitivity should facilitate the determination of the correct scaling of transport with current and field to use for future fully non-inductive ST devices. Scenarios are presented which can be sustained for 8-10 seconds, or (20-30)?CR, at ?N=3.8-4.5, facilitating, for instance, the study of disruption avoidance for very long pulse. Scenarios have been documented which can operate with ?T~25% and equilibrated qmin>1. The value of qmin can be controlled at either fixed non-inductive fraction of 100% or fixed plasma current, by varying which beam sources are used, opening the possibility for feedback qmin control. In terms of quantities like collisionality, neutron emission, non-inductive fraction, or stored energy, these scenarios represent a significant performance extension compared to NSTX and other present spherical torii.

S.P. Gerhardt, R. Andre and J.E. Menard

2012-04-25T23:59:59.000Z

354

Proposal concerning the participation of CERN in the procurement of depleted-uranium sheets for the UA1 calorimeter upgrading  

E-Print Network [OSTI]

Proposal concerning the participation of CERN in the procurement of depleted-uranium sheets for the UA1 calorimeter upgrading

1985-01-01T23:59:59.000Z

355

NLS ground states on graphs  

E-Print Network [OSTI]

We investigate the existence of ground states for the subcritical NLS energy on metric graphs. In particular, we find out a topological assumption that guarantees the nonexistence of ground states, and give an example in which the assumption is not fulfilled and ground states actually exist. In order to obtain the result, we introduce a new rearrangement technique, adapted to the graph where it applies. Owing to such a technique, the energy level of the rearranged function is improved by conveniently mixing the symmetric and monotone rearrangement procedures.

Riccardo Adami; Enrico Serra; Paolo Tilli

2014-06-16T23:59:59.000Z

356

Radon concentrations in ground and drinking water in the state of Chihuahua, Mexico  

Science Journals Connector (OSTI)

This paper reports 222Rn concentrations in ground and drinking water of nine cities of Chihuahua State, Mexico. Fifty percent of the 114 sampled wells exhibited 222Rn concentrations exceeding 11 Bq/L, the maximum contaminant level (MCL) recommended by the USEPA. Furthermore, around 48% (123 samples) of the tap-water samples taken from 255 dwellings showed radon concentrations over the MCL. There is an apparent correlation between total dissolved solids and radon concentration in ground-water. The high levels of 222Rn found may be entirely attributed to the nature of aquifer rocks.

L. Villalba; L. Colmenero Sujo; M.E. Montero Cabrera; A. Cano Jiménez; M. Rentería Villalobos; C.J. Delgado Mendoza; L.A. Jurado Tenorio; I. Dávila Rangel; E.F. Herrera Peraza

2005-01-01T23:59:59.000Z

357

Ground Magnetics At San Francisco Volcanic Field Area (Warpinski, Et Al.,  

Open Energy Info (EERE)

Warpinski, Et Al., Warpinski, Et Al., 2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Magnetics At San Francisco Volcanic Field Area (Warpinski, Et Al., 2004) Exploration Activity Details Location San Francisco Volcanic Field Area Exploration Technique Ground Magnetics Activity Date Usefulness not indicated DOE-funding Unknown Notes Northern Arizona University has re-assessed the existing exploration data, geologically mapped the target area, obtained rock samples for age dating and mineral chemistry, performed gravity and magnetic surveys, and integrated these results to identify potential drilling targets and sites. Further work may occur in 2004 or 2005. References N. R. Warpinski, A. R. Sattler, R. Fortuna, D. A. Sanchez, J.

358

Microsoft Word - CX-Olympia-SouthElma_upgrades_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

0, 2011 0, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Chad Hamel Project Manager - TEP-TPP-1 Proposed Action: The project consists of upgrades to the Olympia-South Elma No. 1, 115-kV transmission line from structure 21/10 to Elma Substation. Budget Information: Work Order #251089 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions or modifications to electric power transmission facilities that would not effect the environment beyond the previously developed facility area including but not limited to....tower modifications, changing insulators, and replacement of poles ...conductors...and crossarms. Location: The project is located in Grays Harbor County, Washington along Bonneville Power

359

Energy Star Building Upgrade Manual Retrocommissioning Chapter 5  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5. Retrocommissioning 5. Retrocommissioning Revised October 2007 5. Overview 2 Energy and Non-energy Benefits 3 5.2 Project Planning 5 Selecting a Project 5 Benchmarking 5 Selecting a Provider and Team 6 Developing a Scope of Work 7 5.3 Project Execution 7 Implementing the Recommendations 8 Maintaining the Benefits 9 Planning for Recommissioning 10 5.4 Tune-up Opportunities  Lighting 11 Supplemental Loads 12 Distribution Systems 13 Heating and Cooling Systems 14 5.5 Summary 6 Bibliography 7 Glossary G- ENERGY STAR ® Building Manual 2 5. Retrocommissioning 5. Overview Retrocommissioning is the first stage in the building upgrade process. The staged approach accounts for the interactions among all the energy flows in a building (Figure 5.1) and pro-

360

Switchyards Rebuild and Upgrade Project in Mohave County, Arizona  

Broader source: Energy.gov (indexed) [DOE]

. . Categorical Exclusion for the Demolition of a Service Building at Davis Dam Lower 230-kV Switchyard as part of the Overall Switchyards Rebuild and Upgrade Project in Mohave County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western Area Power Administration (Western) plans to demolish a service building located in the Lower 230-kV Switchyard at Davis Dam, because it no longer meets our needs and we do not anticipate finding a use for it in the future. The building is currently vacant and has been for years. We plan to begin the work on April 1 ,2011 and complete it by December 31,2011. The attached map shows the project area location. Aerial photographs show that much of this area is developed. Western owns the land. The legal description is

Note: This page contains sample records for the topic "rock grounding upgrades" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Boiler Upgrades Save Money & Energy: Boeing Philadelphia  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Boeing Philadelphia Boeing Philadelphia The Boeing Company, headquartered in the U.S., is the world's largest aerospace company and is a leading manufacturer of commercial jetliners and defense, space, and security systems. The company controls over 84 million square feet of facilities enterprise-wide and employs over 159,000. Through its partnership with ENERGY STAR, Boeing has refined its corporate-wide energy management program. As a result, Boeing has been able to strengthen energy management across its sites, including the Philadelphia plant where the company produces the H-47 Chinook Helicopter. Increases in production prompted Boeing to undertake a project to upgrade 223,000 square feet of factory. The planned major retrofit afforded the opportunity to look holistically at energy use at the site, and

362

Microsoft PowerPoint - ATLAS_upgrade_physics_program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Guy Savard Guy Savard Argonne National Laboratory and University of Chicago Science with the ATLAS Efficiency and Intensity Upgrade ATLAS Users Meeting August 8-9 2009 2 G. Savard 2009 ATLAS S&T Review May 18-19, 2009 Outline Evolving landscape for low-energy nuclear physics Self-assessment of ATLAS present and near future program Process followed to evaluate near and longer term physics program needs and role in community Option proposed - Physics - Machine - Instrumentation 3 G. Savard 2009 ATLAS S&T Review May 18-19, 2009 The new landscape: what is coming to a town near us ---- FRIB ---- At full power - Fast beams - Reaccelerated beams at a few % of that Starts operating ~ 2017-18

363

Microsoft Word - Noxon Radio Station Upgrade CX.doc  

Broader source: Energy.gov (indexed) [DOE]

5, 2011 5, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearence Memorandum David Tripp - TEP-CSB-1 Proposed Action: Noxon Radio Station Upgrade Project Budget Information: Work Order # 00254987 Task 03 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021: B1.7 "Acquisition, installation, operation, and removal of communication systems..." Location: Sanders County, Montana - Section 33, Township 26 North, Range 32 West of the Noxon Rapids Dam Quadrangle Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to replace the existing building at Noxon Radio Station with a new 650 square foot building. The existing building, especially the floor, is deteriorating

364

NEUTRON RADIOGRAPHY (NRAD) REACTOR 64-ELEMENT CORE UPGRADE  

SciTech Connect (OSTI)

The neutron radiography (NRAD) reactor is a 250 kW TRIGA (registered) (Training, Research, Isotopes, General Atomics) Mark II , tank-type research reactor currently located in the basement, below the main hot cell, of the Hot Fuel Examination Facility (HFEF) at the Idaho National Laboratory (INL). It is equipped with two beam tubes with separate radiography stations for the performance of neutron radiography irradiation on small test components. The interim critical configuration developed during the core upgrade, which contains only 62 fuel elements, has been evaluated as an acceptable benchmark experiment. The final 64-fuel-element operational core configuration of the NRAD LEU TRIGA reactor has also been evaluated as an acceptable benchmark experiment. Calculated eigenvalues differ significantly (approximately +/-1%) from the benchmark eigenvalue and have demonstrated sensitivity to the thermal scattering treatment of hydrogen in the U-Er-Zr-H fuel.

John D. Bess

2014-03-01T23:59:59.000Z

365

Upgrade of the cryogenic CERN RF test facility  

SciTech Connect (OSTI)

With the large number of superconducting radiofrequency (RF) cryomodules to be tested for the former LEP and the present LHC accelerator a RF test facility was erected early in the 1990’s in the largest cryogenic test facility at CERN located at Point 18. This facility consisted of four vertical test stands for single cavities and originally one and then two horizontal test benches for RF cryomodules operating at 4.5 K in saturated helium. CERN is presently working on the upgrade of its accelerator infrastructure, which requires new superconducting cavities operating below 2 K in saturated superfluid helium. Consequently, the RF test facility has been renewed in order to allow efficient cavity and cryomodule tests in superfluid helium and to improve its thermal performances. The new RF test facility is described and its performances are presented.

Pirotte, O.; Benda, V.; Brunner, O.; Inglese, V.; Maesen, P.; Vullierme, B. [CERN - European Organization for Nuclear Research, CH-1211 Geneva 23 (Switzerland); Koettig, T. [ESS - European Spallation Source, Box 176, 221 00 Lund (Sweden)

2014-01-29T23:59:59.000Z

366

PDQ physics analysis for the ATR-FSAR upgrade  

SciTech Connect (OSTI)

The final safety analysis report (FSAR) for the Advanced Test Reactor (ATR) is presently being updated at the Idaho National Engineering Laboratory and will use the US Nuclear Regulatory Commission's FSAR format as a guide to provide a safety analysis comparable with that used throughout the commercial nuclear industry. In upgrading the FSAR, an updated reactor core physics analysis is performed on the unique serpentine core design. Unlike the two-dimensional (2D) partial core model used in the original FSAR, this new physics analysis uses both 2D and Three-dimensional (3D) PDQ full-core models employing the most recent cross-section data libraries. The 2D PDQ benchmark comparison provides a reliable validation for the ATR FSAR power distribution calculations. And the new full-core depletion analysis now provides a more detailed picture of changes in core composition, power distributions, and reactivity as a function of time.

Kim, S.S.; Buescher, B.J. (EG and G Idaho, Inc., Idaho Falls (United States))

1992-01-01T23:59:59.000Z

367

THE SNS VACUUM CONTROL SYSTEM UPGRADE FOR THE SUPERCONDUCTING LINAC  

SciTech Connect (OSTI)

The superconducting linac of the Spallation Neutron Source (SNS) has 23 cryomodules whose vacuum system is monitored and controlled by custom built hardware. The original control hardware was provided by Thomas Jefferson National Accelerator Facility (JLab) and contained a variety of custom boards utilizing integrated circuits to perform logic. The need for control logic changes, a desire to increase maintainability, and a desire to increase flexibility to adapt for the future has led to a Programmable Logic Controller (PLC) based upgrade. This paper provides an overview of the commercial off-the-shelf (COTS) hardware being used in the superconducting vacuum control system. Details of the design and challenges to convert a control system during small windows of maintenance periods without disrupting beam operation will be covered in this paper.

Williams, Derrick C [ORNL] [ORNL

2009-01-01T23:59:59.000Z

368

Beam Loss Ion Chamber System Upgrade for Experimental Halls  

SciTech Connect (OSTI)

The Beam loss Ion Chamber System (BLICS) was developed to protect Jefferson Labs transport lines, targets and beam dumps from a catastrophic ''burn through''. Range changes and testing was accomplished manually requiring the experiment to be shut down. The new upgraded system is based around an ''off the shelf'' Programmable Logic Controller located in a single control box supporting up to ten individual detectors. All functions that formerly required an entry into the experimental hall and manual adjustment can be accomplished from the Machine Control Center (MCC). A further innovation was the addition of a High Voltage ''Brick'' at the detector location. A single cable supplies the required voltage for the Brick and a return line for the ion chamber signal. The read back screens display range, trip point, and accumulated dose for each location. The new system is very cost effective and significantly reduces the amount of lost experimental time.

D.W. Dotson; D.J. Seidman

2005-05-16T23:59:59.000Z

369

Spectrally resolved motional Stark effect measurements on ASDEX Upgrade  

SciTech Connect (OSTI)

A spectrally resolved Motional Stark Effect (MSE) diagnostic has been installed at ASDEX Upgrade. The MSE data have been fitted by a forward model providing access to information about the magnetic field in the plasma interior [R. Reimer, A. Dinklage, J. Geiger et al., Contrib. Plasma Phys. 50, 731–735 (2010)]. The forward model for the beam emission spectra comprises also the fast ion D{sub ?} signal [W. W. Heidbrink and G. J. Sadler, Nucl. Fusion 34, 535–615 (1994)] and the smearing on the CCD-chip. The calculated magnetic field data as well as the revealed (dia)magnetic effects are consistent with the results from equilibrium reconstruction solver. Measurements of the direction of the magnetic field are affected by unknown and varying polarization effects in the observation.

Reimer, R.; Dinklage, A.; Wolf, R. [Max-Planck-Institut für Plasmaphysik, EURATOM Association, Teilinstitut Greifswald, Wendelsteinstraße 1, 17491 Greifswald (Germany)] [Max-Planck-Institut für Plasmaphysik, EURATOM Association, Teilinstitut Greifswald, Wendelsteinstraße 1, 17491 Greifswald (Germany); Fischer, R.; Hobirk, J.; Löbhard, T.; Mlynek, A.; Reich, M. [Max-Planck-Institut für Plasmaphysik, EURATOM Association, Boltzmannstraße 2, 85748 Garching (Germany)] [Max-Planck-Institut für Plasmaphysik, EURATOM Association, Boltzmannstraße 2, 85748 Garching (Germany); Sawyer, L. [Department of Physics and Astronomy, University of Sheffield, Sheffield S3 7RH (United Kingdom)] [Department of Physics and Astronomy, University of Sheffield, Sheffield S3 7RH (United Kingdom); Collaboration: ASDEX Upgrade

2013-11-15T23:59:59.000Z

370

Cost-effectiveness of conservation upgrades in manufactured homes  

SciTech Connect (OSTI)

This study addresses the costs of upgrading the efficiency of electrically heated manufactured homes in the Bonneville Power Administration's (Bonneville's) service territory. It was prepared by the Battelle Pacific Northwest Laboratory (PNL) for Bonneville under a Related Services Agreement with the US Department of Energy, Contract AC06-76RLO1830. Manufactured homes (commonly called mobile homes) represent a significant lost conservation resource in the region. Manufactured homes are required to meet national energy standards that do not reflect the recent increases in energy prices, and the preemptive nature of the national standards prevents local jurisdictions from establishing stricter requirements. Bonneville has undertaken several programs to analyze the efficiency of manufactured homes and encourage the industry to produce more efficient homes and consumers to increase their demand for efficient units. This study constitutes one portion of Bonneville's overall strategy. 45 refs.

Lee, A.D.; Conner, C.C.; Englin, J.E.; Hadley, D.L.; Lucas, R.G.; Miller, N.E.; Monroe, W.H.

1988-09-01T23:59:59.000Z

371

Integrated EM & Thermal Simulations with Upgraded VORPAL Software  

SciTech Connect (OSTI)

Nuclear physics accelerators are powered by microwaves which must travel in waveguides between room-temperature sources and the cryogenic accelerator structures. The ohmic heat load from the microwaves is affected by the temperature-dependent surface resistance and in turn affects the cryogenic thermal conduction problem. Integrated EM & thermal analysis of this difficult non-linear problem is now possible with the VORPAL finite-difference time-domain simulation tool. We highlight thermal benchmarking work with a complex HOM feed-through geometry, done in collaboration with researchers at the Thomas Jefferson National Accelerator Laboratory, and discuss upcoming design studies with this emerging tool. This work is part of an effort to generalize the VORPAL framework to include generalized PDE capabilities, for wider multi-physics capabilities in the accelerator, vacuum electronics, plasma processing and fusion R&D fields, and we will also discuss user interface and algorithmic upgrades which facilitate this emerging multiphysics capability.

D.N. Smithe, D. Karipides, P. Stoltz, G. Cheng, H. Wang

2011-03-01T23:59:59.000Z

372

EBR-II cover-gas cleanup system upgrade  

SciTech Connect (OSTI)

Technology advances in the past few years have prompted an effort at Argonne National Laboratory to replace existing equipment with high-performance digital computers and color-graphic displays. Improved operation of process systems can be achieved by utilizing state-of-the-art computer technology in the areas of process control and process monitoring. The cover-gas cleanup system (CGCS) at the Experimental Breeder Reactor II (EBR-II) is the first system to be upgraded with high-performance digital equipment. The upgrade consisted of a main control computer, a distributed control computer, a front-end input/output computer, a main graphics interface terminal, and a remote graphics interface terminal. This paper describes the main control computer and the operator interface control software. Argonne National Laboratory's EBR-II is a pool-type nuclear reactor demonstration facility that uses liquid sodium as the primary system and secondary system coolant. The primary system tank contains [approximately]330000 [ell] of liquid sodium blanketed with an argon cover gas. Despite this inert atmosphere, the primary system requires a cover-gas monitoring and cleanup system, the CGCS. The CGCS maintains low levels of impurities in the cover gas so that even small levels of impurities can be detected to flag a failed fuel element and to support mass spectrometer analysis to identify a failed fuel element. Impurities can be introduced to the argon cover gas by the failure of fuel element cladding and the subsequent release of gaseous fission products or xenon [open quotes]tag gas[close quotes] placed in the fuel elements for the purpose of signaling a fuel element breach. The CGCS consists of a main cleanup loop and a gas analysis system.

Staffon, J.D.; Carlson, R.B. (Argonne National Lab., Idaho Falls (United States))

1993-01-01T23:59:59.000Z

373

Nuclear materials control and accountability criteria for upgrades measures  

SciTech Connect (OSTI)

As a result of major political and societal changes in the past several years, methods of nuclear material control may no longer be as effective as in the past in Russia, the Newly Independent States (NIS), and the Baltic States (BS). The objective of the Department of Energy (DOE) Material Protection, Control, and Accounting Program (MPC and A) is to reduce the threat of nuclear proliferation by collaborating with Russia, NIS, and BS governments to promote western-style MPC and A. This cooperation will improve the MPC and A on all weapons useable nuclear materials and will establish a sustainable infrastructure to provide future support and maintenance for these technology-based improvements. Nuclear materials of proliferation concern include materials of the types and quantities that can be most easily and directly used in a nuclear weapon. Sabotage of nuclear material is an event of great concern and potentially disastrous consequences to both the US and the host country. However, sabotage is currently beyond the scope of program direction and cannot be used to justify US-funded MPC and A upgrades. Judicious MPC and A upgrades designed to protect against insider and outsider theft scenarios would also provide addition, although not comprehensive, protection against saboteurs. This paper provides some suggestions to establish consistency in prioritizing system-enhancement efforts at nuclear material facilities. The suggestions in this paper are consistent with DOE policy and directions and should be used as a supplement to any policy directives issued by NN-40, DOE Russia/NIS Task Force.

Erkkila, B.H.; Hatcher, C.R.

1998-11-01T23:59:59.000Z

374

/sup 10/Be profiles in lunar surface rock 68815  

SciTech Connect (OSTI)

Cosmic ray produced /sup 10/Be (t/sub 1/2/ = 1.6 x 10/sup 6/ years) activities have been measured in fourteen carefully ground samples of lunar surface rock 68815. The /sup 10/Be profiles from 0 to 4 mm are nearly flat for all three surface angles measured and show a very slight increase with depth from the surface to a depth of 1.5 cm. These depth profiles are in contrast to the SCR (solar cosmic ray) produced /sup 26/Al and /sup 53/Mn profiles measured from these same samples. There is no sign of SCR produced /sup 10/Be in this rock. The discrepancy between the data and the Reedy-Arnold theoretical calculation (about 2 dpm /sup 10/Be/kg at the surface) can be explained in two ways: (1) the low energy proton induced cross sections for /sup 10/Be production from oxygen are really lower than those used in the calculations or, (2) compared to the reported fits for /sup 26/Al and /sup 53/Mn, the solar proton spectral shape is actually softer (exponential rigidity parameter Ro less than 100 MV), the omnidirectional flux above 10 MeV is higher (more than 70 protons/cm/sup 2/ s), and the erosion rate is higher (greater than 1.3 mm/My). /sup 10/Be, as a high energy product, is a very useful nuclide for helping to obtain the SCR spectral shape in the past. 23 refs., 3 figs., 1 tab.

Nishiizumi, K.; Imamura, M.; Kohl, C.P.; Nagai, H.; Kobayashi, K.; Yoshida, K.; Yamashita, H.; Reedy, R.C.; Honda, M.; Arnold, J.R.

1987-01-01T23:59:59.000Z

375

Rock-brine chemical interactions. Final report  

SciTech Connect (OSTI)

The results of experimental interaction of powdered volcanic rock with aqueous solutions are presented at temperatures from 200 to 400/sup 0/C, 500 to 1000 bars fluid pressure, with reaction durations of approximately 30 days under controlled laboratory conditions. The aim of this research is to develop data on the kinetics and equilibria of rock solution interactions that will provide insight into the complex geochemical processes attending geothermal reservoir development, stimulation, and reinjection. The research was done in the Stanford Hydrothermal Lab using gold cell equipment of the Dickson design. This equipment inverts the solution rock mixture several times a minute to ensure thorough mixing. Solution samples were periodically withdrawn without interruption of the experimental conditions. The data from these experiments suggests a path dependent series of reactions by which geothermal fluids might evolve from meteoric or magmatic sources.

Not Available

1982-02-01T23:59:59.000Z

376

Calibrating Pesticide Application Ground Equipment  

E-Print Network [OSTI]

This pocket-sized guide gives step-by-step instructions for calibrating ground sprayers. Tables provide instructions, examples and sample formulas for determining speed of application, flow rate and the amount of pesticide to add to the tank....

Shaw, Bryan W.

2000-07-05T23:59:59.000Z

377

Ground Water Management Regulations (Louisiana)  

Broader source: Energy.gov [DOE]

The rules and regulations apply to the management of the state's ground water resources. In addition, the Commissioner of Conservation has recommended that oil and gas operators with an interest...

378

Category:Little Rock, AR | Open Energy Information  

Open Energy Info (EERE)

AR AR Jump to: navigation, search Go Back to PV Economics By Location Media in category "Little Rock, AR" The following 16 files are in this category, out of 16 total. SVFullServiceRestaurant Little Rock AR Entergy Arkansas Inc.png SVFullServiceRestauran... 71 KB SVHospital Little Rock AR Entergy Arkansas Inc.png SVHospital Little Rock... 69 KB SVLargeHotel Little Rock AR Entergy Arkansas Inc.png SVLargeHotel Little Ro... 70 KB SVLargeOffice Little Rock AR Entergy Arkansas Inc.png SVLargeOffice Little R... 71 KB SVMediumOffice Little Rock AR Entergy Arkansas Inc.png SVMediumOffice Little ... 68 KB SVMidriseApartment Little Rock AR Entergy Arkansas Inc.png SVMidriseApartment Lit... 70 KB SVOutPatient Little Rock AR Entergy Arkansas Inc.png SVOutPatient Little Ro...

379

Questa Baseline and Pre-Mining Ground-Water Quality Investigation. 3. Historical Ground-Water  

E-Print Network [OSTI]

............................................................................................................................................................... 9 Mine history and ground-water development ....................................................................................................................................................... 11 Ground-water quality database.......................................................................................................................................................... 29 Compilation of complete database

380

Rim Rock Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Rim Rock Wind Farm Rim Rock Wind Farm Jump to: navigation, search Name Rim Rock Wind Farm Facility Rim Rock Wind Farm Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner NaturEner Developer NaturEner Energy Purchaser San Diego Gas & Electric Location Glacier and Toole Counties MT Coordinates 48.779564°, -112.061291° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":48.779564,"lon":-112.061291,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "rock grounding upgrades" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Storage capacity in hot dry rock reservoirs  

DOE Patents [OSTI]

A method of extracting thermal energy, in a cyclic manner, from geologic strata which may be termed hot dry rock. A reservoir comprised of hot fractured rock is established and water or other liquid is passed through the reservoir. The water is heated by the hot rock, recovered from the reservoir, cooled by extraction of heat by means of heat exchange apparatus on the surface, and then re-injected into the reservoir to be heated again. Water is added to the reservoir by means of an injection well and recovered from the reservoir by means of a production well. Water is continuously provided to the reservoir and continuously withdrawn from the reservoir at two different flow rates, a base rate and a peak rate. Increasing water flow from the base rate to the peak rate is accomplished by rapidly decreasing backpressure at the outlet of the production well in order to meet periodic needs for amounts of thermal energy greater than a baseload amount, such as to generate additional electric power to meet peak demands. The rate of flow of water provided to the hot dry rock reservoir is maintained at a value effective to prevent depletion of the liquid

Brown, Donald W. (Los Alamos, NM)

1997-01-01T23:59:59.000Z

382

Thermophysical properties of the Po Basin rocks  

Science Journals Connector (OSTI)

......W.E., AAPG, Memoir 1. Hadgu T. , Clinton C.L., Bean J.E., 2007. Determination of heat capacity of Yucca Mountain stratigraphic layer, Int. J. Rock Mech. Min. Sci., 44, 1022-1034. Hamilton E. , 1976. Variations of density......

V. Pasquale; G. Gola; P. Chiozzi; M. Verdoya

2011-07-01T23:59:59.000Z

383

Hot-dry-rock geothermal resource 1980  

SciTech Connect (OSTI)

The work performed on hot dry rock (HDR) geothermal resource evaluation, site characterization, and geophysical exploration techniques is summarized. The work was done by region (Far West, Pacific Northwest, Southwest, Rocky Mountain States, Midcontinent, and Eastern) and limited to the conterminous US.

Heiken, G.; Goff, F.; Cremer, G. (ed.)

1982-04-01T23:59:59.000Z

384

E-Print Network 3.0 - archean metavolcanic rocks Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(Krner, 1985). However, the tectonic setting and age of metavolcanic rocks in Egypt are poorly... metavolcanic rocks. Metavolcanic rocks in Egypt were described by...

385

Does roughening of rock-fluid-rock interfaces emerge from a stress-induced instability?  

Science Journals Connector (OSTI)

Non-planar solid-fluid-solid interfaces under stress are very common in many industrial and natural materials. For example, in the Earth’s crust, many rough and wavy interfaces can be observed in rocks in a wi...

E. Bonnetier; C. Misbah; F. Renard; R. Toussaint…

2009-01-01T23:59:59.000Z

386

Upgrade fo the CMS Hadron Outer Calorimeter with SIPMs  

SciTech Connect (OSTI)

The CMS Hadron Outer Calorimeter (HO) is undergoing an upgrade to replace the existing photodetectors (HPDs) with SIPMs. The chosen device is the Hamamatsu 3 x 3mm 50 {mu}m pitch MPPC. The system has been developed to be a 'drop-in' replacement of the HPDs. A complete control system of bias voltage generation, leakage current monitoring, temperature monitoring, and temperature control using solid state Peltier coolers has been developed and tested. 108 channels of the system have been installed into CMS and operated for more than 2 years. The complete system of about 2200 channels is in production and will be installed in the next LHC long shutdown scheduled for 2013. The CMS central calorimeter consists of a detector inside the solenoidal magnet, HB, and a component outside the magnet, the Outer Hadron Calorimeter, HO [1]. The HO is installed inside the magnet flux return yoke and provides for typically 3{lambda} of additional absorber to the calorimetric measurement. The outer calorimeter is composed of one or more layers of scintillator with wavelength shifting fiber readout into photodetectors. Figure 1 (a) shows the schematic layout of the calorimeters in CMS and shows the location of the HO scintillator layers. The front end electronics are placed inside the CMS detector, close to the scintillators. Figure 1(b) shows a photograph of the scintillators. Note the four wavelength shifting fibers per tile. The tile size creates a projective tower with the HB. Currently the photodetector used is the HPD but for performance and operational reasons it is desired to upgrade these with SIPMs. The CMS HCAL group has developed a drop-in replacement for the HPD using SIPMs. SIPMs are very suitable for this application because of several factors: The radiation levels are modest with a lifetime expected fluence of less than 5*10{sup 11} neutrons (E > 100 KeV) per cm{sup 2}. The energy flux into HO is small, the rate of larger energy depositions is low, and the required dynamic range is modest. The HO is in the return magnetic field of up to 2KG and the photodetector needs to operate in that environment. Finally, the available physical volume for the photodetectors is small.

Anderson, Jacob; Freeman, James; Los, Sergey; Whitmore, Juliana; /Fermilab

2011-09-14T23:59:59.000Z

387

Modeling of crack initiation, propagation and coalescence in rocks  

E-Print Network [OSTI]

Natural or artificial fracturing of rock plays a very important role in geologic processes and for engineered structures in and on rock. Fracturing is associated with crack initiation, propagation and coalescence, which ...

Gonçalves da Silva, Bruno Miguel

2009-01-01T23:59:59.000Z

388

VancouverParksville White RockNew Westminster  

E-Print Network [OSTI]

Courtenay VancouverParksville Abbotsford White RockNew Westminster Squamish Chilliwack Port McNeill Powell

389

Technology Section of the White Paper on the Status and Future of Ground-based TeV Gamma-ray Astronomy  

E-Print Network [OSTI]

This is a report on the findings of the technology working group for the white paper on the status and future of TeV gamma-ray astronomy. The white paper is an APS commissioned document, and the overall version has also been released and can be found on astro-ph. This detailed section of the white paper discusses different technology opportunities and the technical feasibility for substantially improving IACTS and ground based particle detectors to achieve an order of magnitude better sensitivity than the instruments employed today as well as their planned upgrades. A technology roadmap for improving IACTS and ground based particle detectors is presented.

K. Byrum; J. Buckley; S. Bugayov; B. Dingus; S. Fegan; S. Funk; E. Hays; J. Holder; D. Horan; A. Konopelko; H. Krawczynski; F. Krennrich; S. Lebohec; G. Sinnis; A. Smith; V. Vassiliev; S. Wakely

2008-10-24T23:59:59.000Z

390

Solar Classroom Update: Making Clean Energy Upgrades a Back-to-School  

Broader source: Energy.gov (indexed) [DOE]

Classroom Update: Making Clean Energy Upgrades a Classroom Update: Making Clean Energy Upgrades a Back-to-School Priority Solar Classroom Update: Making Clean Energy Upgrades a Back-to-School Priority August 21, 2013 - 2:52pm Addthis Watch as Aaron Sebens, a fourth-grade teacher in Durham, North Carolina, gives an update on his student's solar-powered classroom project. Erin R. Pierce Erin R. Pierce Digital Communications Specialist, Office of Public Affairs Clean Energy Resources Watch our first video on the solar-powered classroom. Check out Lawrence Berkeley National Laboratory's guide on planning and financing energy upgrades for schools. Visit Energy Saver for more resources on saving energy and money. This week, Energy.gov is heading back to school. We'll be featuring stories on the role students and schools play in driving America's energy

391

EA-1906: Operations, Consolidation, and Upgrades at the Office of Secure  

Broader source: Energy.gov (indexed) [DOE]

6: Operations, Consolidation, and Upgrades at the Office of 6: Operations, Consolidation, and Upgrades at the Office of Secure Transportation Western Command Site, Albuquerque, NM EA-1906: Operations, Consolidation, and Upgrades at the Office of Secure Transportation Western Command Site, Albuquerque, NM Summary This EA evaluates environmental impacts associated with the siting and construction of several proposed buildings, including a new vehicle maintenance facility and mobile equipment maintenance building (and their support structures) at the Western Command Site, Albuquerque, NM. Public Comment Opportunities None available at this time. Documents Available for Download July 10, 2012 EA-1906: Finding of No Significant Impact Operations, Upgrades, and Consolidation at the Western Command Site, NM July 10, 2012 EA-1906: Final Environmental Assessment

392

Saving Money on Your Energy-Saving Upgrades | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Saving Money on Your Energy-Saving Upgrades Saving Money on Your Energy-Saving Upgrades Saving Money on Your Energy-Saving Upgrades August 16, 2011 - 11:17am Addthis Eric Barendsen Energy Technology Program Specialist, Office of Energy Efficiency and Renewable Energy Summer is one of the best times of the year to get motivated to make those energy efficiency upgrades on your to-do list, and the Department of Energy can point you to some incentives to make the initial investment more affordable. Energy-saving products will save you considerable money over the long term, helping these products pay for themselves and significantly reducing your monthly energy bills. Homeowners ready to take advantage of the savings should check out the energy efficiency tax credits offered through the IRS and promoted by the

393

EA-1948: Gila-North Gila Rebuild and Upgrade Project, Yuma County, Arizona  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

48: Gila-North Gila Rebuild and Upgrade Project, Yuma County, 48: Gila-North Gila Rebuild and Upgrade Project, Yuma County, Arizona EA-1948: Gila-North Gila Rebuild and Upgrade Project, Yuma County, Arizona SUMMARY DOE's Western Area Power Administration (Western) is preparing an EA to analyze the potential environmental impacts of a proposal to rebuild and upgrade two parallel 4.8-mile transmission lines between the Gila and North Gila Substations and take actions in support of portions of Arizona Public Service's construction of a new, 12.8 mile 230-kV transmission line between North Gila and a proposed substation in Yuma County, Arizona. The U.S. Bureau of Reclamation and U.S. Army Corps of Engineers are cooperating agencies. PUBLIC COMMENT OPPORTUNITIES Send comments on the Draft Environmental Assessment by January 21, 2014, by

394

Have You Added Value to Your Home with Energy Saving Upgrades? | Department  

Broader source: Energy.gov (indexed) [DOE]

Have You Added Value to Your Home with Energy Saving Upgrades? Have You Added Value to Your Home with Energy Saving Upgrades? Have You Added Value to Your Home with Energy Saving Upgrades? July 15, 2011 - 3:47pm Addthis This week, Eric shared his thoughts on Building Value with Energy-Saving Upgrades in Homes and Businesses. He also mentioned the U.S. Department of Energy's Commercial Building Initiative, which is a partnership between the department and industry representatives to encourage the development of higher commercial building efficiency measures. Read the full text of the partnership agreement. How about you? Have you done any energy-efficient remodeling and seen your home increase in either value or appeal to potential buyers? Or are you planning to do so in the next few years? Each week, you have the chance to share your thoughts on a question about

395

U.S. And Russia Complete Nuclear Security Upgrades Under Bratislava  

Broader source: Energy.gov (indexed) [DOE]

And Russia Complete Nuclear Security Upgrades Under Bratislava And Russia Complete Nuclear Security Upgrades Under Bratislava Initiative U.S. And Russia Complete Nuclear Security Upgrades Under Bratislava Initiative December 23, 2008 - 9:18am Addthis WASHINGTON, DC -The U.S. Department of Energy today delivered the Bratislava Nuclear Security report to the White House, which detailed the status of work agreed to by Presidents Bush and Putin in Bratislava in 2005. U.S. and Russian officials from the U.S. Department of Energy's National Nuclear Security Administration (NNSA), the U.S. Department of Defense, the Russian Ministry of Defense and State Atomic Energy Corporation "Rosatom" reviewed work to complete nuclear security upgrades in Russia at meetings in Moscow last week. Building on this success, both

396

Microsoft Word - CX-BettasRd-ColumbiaThermalUpgradeFY12_WEB.docx  

Broader source: Energy.gov (indexed) [DOE]

25, 2012 25, 2012 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Chad Hamel Project Manager - TEP-TPP-1 Proposed Action: Bettas Road-Columbia No. 1 230-kV transmission line thermal upgrade Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): Appendix B4.13, Upgrading and rebuilding existing powerlines Location: Kittitas and Chelan counties, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The project, as proposed, is to upgrade the existing Bettas Road-Columbia No. 1 230-kV transmission line to a maximum operating temperature of 100 °C. Five small segments (equal to approximately 3 miles) along the transmission line will be upgraded in order to meet this overall objective. Construction includes the relocation and

397

FY 2013 Reactor Upgrades FOA (DE-FOA-0000815) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3 Reactor Upgrades FOA (DE-FOA-0000815) 3 Reactor Upgrades FOA (DE-FOA-0000815) FY 2013 Reactor Upgrades FOA (DE-FOA-0000815) This Funding Opportunity Announcement (FOA) is the fiscal year 2013 solicitation for Nuclear Energy University Programs (NEUP) University Reactor Upgrades Infrastructure Support for the Department of Energy's (DOE) Office of Nuclear Energy (NE). The development of nuclear energy-related infrastructure and basic capabilities in the university and college community is necessary to promote R&D that supports nuclear science and engineering (NS&E), DOE-NE's mission, and the Nation's nuclear energy challenges. Accordingly, we intend to enable the education and training of nuclear scientists, engineers, and policy-makers in graduate and undergraduate study and two-year programs, as well as R&D that is relevant to the

398

ASDEX-UPGRADE TOKAMAK EMULATOR FOR TEST OF CONTROL SYSTEM AND SHOT PROGRAMME  

E-Print Network [OSTI]

for controlled nuclear fusion. Its main component is a vacuum vessel, in torus shape, in which the plasma is kept, their output is the control system's output. At ASDEX-Upgrade only used as input for the emulator to close

Zachmann, Gabriel

399

Guidelines for Home Energy Professionals: Standard Work Specifications for Single-Family Home Energy Upgrades  

Broader source: Energy.gov [DOE]

The Standard Work Specifications (SWS) for Single-Family Home Energy Upgrades define the minimum acceptable outcomes for any weatherization or home performance task to be effective, durable, and safe.

400

Automation of airlift scheduling for the upgraded command and control system of military airlift command  

E-Print Network [OSTI]

This report describes a conceptual design for automation of the scheduling of airlift activities as part of the current upgrade of the MAC C2 System. It defines the airlift scheduling problem in generic terms before reviewing ...

Simpson, R. W.

1984-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "rock grounding upgrades" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

New challenges in beamline instrumentation for the ESRF Upgrade Programme Phase II  

Science Journals Connector (OSTI)

A comprehensive review of some of the challenges in scientific instrumentation encountered by the ESRF in the context of the preparation of the Phase II of its upgrade programme is presented.

Susini, J.

2014-08-29T23:59:59.000Z

402

Participation as an end versus a means : understanding a recurring dilemma in urban upgrading  

E-Print Network [OSTI]

Since the 1920s, participatory approaches to urban upgrading in developing nations have demonstrated that involving the urban poor in the physical, social, and economic development of their settlements could improve their ...

Fallavier, Pierre

2007-01-01T23:59:59.000Z

403

Transcript of April 11, 2013, TAP webinar titled Financing Energy Upgrades for K-12 School Districts  

Broader source: Energy.gov [DOE]

U.S. Department of Energy (DOE) Technical Assistance Program (TAP) transcript of a TAP webinar held on April 11, 2013 and dealing with how to finance energy efficiency upgrades for K-12 school districts.

404

Bioenergy Technologies Office Conversion R&D Pathway: Syngas Upgrading to Hydrocarbon Fuels  

Broader source: Energy.gov [DOE]

Syngas upgrading to hydrocarbon fuels is one of eight priority pathways chosen to convert biomass into hydrocarbon fuels by the Bioenergy Technologies Office. These pathways were down-selected from an initial list of 18.

405

All that glitters is not gold : unexpected lessons from a slum upgrading program in Brazil  

E-Print Network [OSTI]

This paper looks at the Ribeira Azul Slum Upgrading Program in Salvador de Bahia Brazil, implemented by the development agency of the state of Bahia, CONDER, and the Italian NGO Associazione Volontari per il Servizio ...

Zuin, Valentina

2005-01-01T23:59:59.000Z

406

INTEGRATED CONCEPTS FOR REUSE OF UPGRADED WASTEWATER – ROLE OF MEMBRANES IN WATER RECYCLING  

Science Journals Connector (OSTI)

The AQUAREC project on “Integrated Concepts for Reuse of Upgraded Wastewater” is funded by the European Commission within the 5th Framework Programme as well as in Australia by the Commonwealth Department of E...

THOMAS WINTGENS; THOMAS MELIN; DAVIDE BIXIO…

2006-01-01T23:59:59.000Z

407

Energy-Efficient Capacity Upgrade in Optical Networks with Mixed Line Rates  

Science Journals Connector (OSTI)

We investigate the energy-efficient network upgrade problem. The traffic growth in a mixed-line-rate (10/40/100 Gbps) optical network is supported through both non-disruptive and...

Nag, Avishek; Tornatore, Massimo; Wang, Ting; Mukherjee, Biswanath

408

Upgrading of Fast Pyrolysis Oil via HDO Using Nano-Structured Catalysts.  

E-Print Network [OSTI]

??The effects of type of solvents (hydro-treated or upgraded pyrolysis oil and ethanol) on hydro-de-oxygenation (HDO) of fast pyrolysis oil were studied. The presence and… (more)

Ahmadi, Shima

2014-01-01T23:59:59.000Z

409

EIS-0484: Montana-to-Washington Transmission System Upgrade Project in  

Broader source: Energy.gov (indexed) [DOE]

4: Montana-to-Washington Transmission System Upgrade Project 4: Montana-to-Washington Transmission System Upgrade Project in Washington, Idaho, and Montana EIS-0484: Montana-to-Washington Transmission System Upgrade Project in Washington, Idaho, and Montana SUMMARY This EIS will evaluate the environmental impacts of a proposal to replace roughly 12 miles of transmission line on the Taft-Dworshak 500-kV transmission line, install new series capacitors on the Garrison-Taft 500-kV transmission line, and perform various upgrades to Bell, Hatwai, Dworshak, Garrison, and Hot Springs substations. The project website is http://efw.bpa.gov/environmental_services/Document_Library/M2W/. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVALABLE FOR DOWNLOAD May 3, 2012 EIS-0484: Notice of Intent to Prepare an Environmental Impact Statement

410

EA-1247: Electrical Power System Upgrades at Los Alamos National Laboratory, Los Alamos, New Mexico  

Broader source: Energy.gov [DOE]

This EA evaluates the environmental impacts for the proposal to upgrade the electrical power supply system for the U.S. Department of Energy Los Alamos National Laboratory to increase the...

411

The Critical Zone: Where Rock Meets Life:  

Science Journals Connector (OSTI)

...important mechanistic information. Hence, the...studies of whole genomes and collections of genomes are increasingly...and structural information from genomic...CCES through the project BigLink. FGP's...ground water human activity interfaces...

Jon Chorover; Ruben Kretzschmar; Ferran Garcia-Pichel; Donald L. Sparks

412

Rock mechanics activities at the Waste Isolation Pilot Plant  

SciTech Connect (OSTI)

The application of rock mechanics at nuclear waste repositories is a true multidisciplinary effort. A description and historical summary of the Waste Isolation Pilot Plant (WIPP) is presented. Rock mechanics programs at the WIPP are outlined, and the current rock mechanics modeling philosophy of the Westinghouse Waste Isolation Division is discussed.

Francke, C. [Westinghouse Electric Corp., Carlsbad, NM (United States); Saeb, S. [International Technology Corp., Albuquerque, NM (United States)

1996-12-31T23:59:59.000Z

413

Screening of processing and upgrading schemes. Task 3  

SciTech Connect (OSTI)

The RFP was predicated on DOE`s desire to enhance the development of advanced transportation fuels made from coal via a program to process mild coal gasification (MCG) liquids into high volumetric energy density (HEDF) test fuels. The desired product fuels were to be cost effectively manufactured, have high volumetric energy density, and be hydrocarbon-based for existing and prototype turbine and diesel engines. The sources for these special fuels consist of the abundant and secure indigenous energy resources of coal. Comparison studies were also to be made using other non-petroleum fossil fuels such as shale oil and tar sands bitumen. METC has concluded that MCG technology has the potential to simultaneously satisfy the transportation and power generation fuel needs in the most cost-effective manner. MCG is based on low temperature pyrolysis, a technique known to the coal community for over a century. Most past pyrolysis developments were aimed at maximizing the liquids yield which results in a low quality tarry product requiring significant and capital intensive upgrading. By properly tailoring the pyrolysis severity to control the liquid yield-liquid quality relationship, it has been found that a higher quality distillate-boiling liquid can be readily ``skimmed`` from the coal. The resultant liquids have a much higher H/C ratio than conventional pyrolytic tars and therefore can be hydroprocessed at lower cost. These liquids are also extremely enriched in 1-, 2-, and 3-ring aromatics.

Not Available

1991-10-01T23:59:59.000Z

414

The NIR Upgrade to the SALT Robert Stobie Spectrograph  

E-Print Network [OSTI]

The near infrared (NIR) upgrade to the Robert Stobie Spectrograph (RSS) on the Southern African Large Telescope (SALT), RSS/NIR, extends the spectral coverage of all modes of the visible arm. The RSS/NIR is a low to medium resolution spectrograph with broadband imaging, spectropolarimetric, and Fabry-Perot imaging capabilities. The visible and NIR arms can be used simultaneously to extend spectral coverage from approximately 3200 A to 1.6 um. Both arms utilize high efficiency volume phase holographic gratings via articulating gratings and cameras. The NIR camera is designed around a 2048x2048 HAWAII-2RG detector housed in a cryogenic dewar. The Epps optical design of the camera consists of 6 spherical elements, providing sub-pixel rms image sizes of 7.5 +/- 1.0 um over all wavelengths and field angles. The exact long wavelength cutoff is yet to be determined in a detailed thermal analysis and will depend on the semi-warm instrument cooling scheme. Initial estimates place instrument limiting magnitudes at J = 23.4 and H(1.4-1.6 um) = 21.6 for S/N = 3 in a 1 hour exposure well below the sky noise.

Andrew I. Sheinis; Marsha J. Wolf; Matthew A. Bershady; David A. H. Buckley; Kenneth H. Nordsieck; Ted B. Williams

2006-06-05T23:59:59.000Z

415

Upgrading the performance of groudwater VOC air strippers  

SciTech Connect (OSTI)

Rocketdynes Santa Susana Field Laboratory has been treating groundwater to remove chlorinated solvents since 1987. Six air stripping treatment installations, using vapor-phase carbon to control air emissions, have consistently met effluent quality standards over nine years of operation. In 1995, Rocketdyne embarked on an inspection and maintenance program to thoroughly check tower equipment and packing condition and to improve treatment efficiency using new packing technology now available. Baseline removal efficiency measurements were made on one large-capacity air stripper, which was then shut down for inspection. The original random packing was found to be fouled, and had settled too far below the level of the spray nozzle. The packing was removed, and replaced with a newer, high-efficiency packing. As a result, single-stage removal efficiency for trichloroethylene increased from 98.5% to > 99.60%. Aside from demonstrating the improvement attainable by upgrading the packing media, Rocketdyne`s maintenance program also highlighted the critical importance of proper liquid distribution. At one point, the refurbished air stripper was overpacked, resulting in concentration of the water spray near the center of the packed section. The liquid distribution was found to remain grossly nonuniform even after the water had trickled down over 8.2 meters of packing in a 91-cm diameter column. 4 refs., 1 fig., 5 tabs.

Nelson, A.D. [Rockwell International Corp., Canoga Park, CA (United States); Schmitt, R.J. [EnviroSolve Corp., Agoura Hills, CA (United States); Dickeson, D. [Lantec Products, Inc., Agoura Hills, CA (United States)

1997-12-31T23:59:59.000Z

416

RF System Modeling for the CEBAF Energy Upgrade  

SciTech Connect (OSTI)

An RF system model, based on MATLAB/SIMULINK, has been developed for analyzing the basic characteristics of the low level RF (LLRF) control system being designed for the CEBAF 12 GeV Energy Upgrade. In our model, a typical passband cavity representation is simplified to in-phase and quadrature (I&Q) components. Lorentz Force and microphonic detuning are incorporated as a new quadrature carrier frequency (frequency modulation). Beam is also represented as in-phase and quadrature components and superpositioned with the cavity field vector. Signals pass through two low pass filters, where the cutoff frequency is equal to half of the cavity bandwidth, then they are demodulated using the same detuning frequency. Because only baseband I&Q signals are calculated, the simulation process is very fast when compared to other controller-cavity models. During the design process we successfully analyzed gain requirements vs. field stability for different superconducting cavity microphonic backgrounds and Lorentz Force coefficients. Moreover, we were able to evaluate different types of a LLRF system’s control algorithm: GDR (Generator Driven Resonator) and SEL (Self Excited Loop) [1] as well as klystron power requirements for different cavities and beam loads.

Tomasz Plawski, J. Hovater

2009-05-01T23:59:59.000Z

417

OPERATIONAL EXPERIENCE OF THE UPGRADED CRYOGENIC SYSTEMS AT THE NSCL  

SciTech Connect (OSTI)

The National Superconducting Cyclotron Laboratory (NSCL) is a NSF-supported facility, with additional support from Michigan State University (MSU) for conducting research in nuclear and accelerator science. The facility consists of two superconducting cyclotrons and over fifty individual cryostats, each containing several superconducting magnets that are used in the beam transport system. Beginning in 1999 a major facility upgrade was started. New, larger magnets were added, increasing the total 4.5 K loads, necessitating an increase of the cryogenic capacity. A helium plant (nominal 1750-Watt at 4.5 K) was acquired from the United States Bureau of Mines where it had been operating as a pure liquefier since the early 1980's. It was refurbished for the NSCL with extensive support from the cryogenics group at Thomas Jefferson National Laboratory. The new cryogenic system came online early in 2001. The cold-mass is relatively high in relation to the installed capacity, presenting challenges during cool downs. Reliability over the last five years has been greater than 99%. An overview of the last seven years of operations of our cryogenic systems is presented that includes normal operations, testing of new equipment, noteworthy breakdowns, routine maintenance, and system reliability.

McCartney, A. H.; Laumer, H. L.; Jones, S. A. [National Superconducting Cyclotron Laboratory, Michigan State University, East Lansing, MI, 48824 (United States)

2010-04-09T23:59:59.000Z

418

Prototype of time digitizing system for BESIII endcap TOF upgrade  

E-Print Network [OSTI]

The prototype of time digitizing system for the upgrade of BESIII endcap TOF (ETOF) is introduced in this paper. The ETOF readout electronics has a formation of distributed architecture that hit signal from multi-gap resistive plate chamber (MRPC) is signaled as LVDS by front-end electronics (FEE) and sent to the back-end time digitizing system via long shield differential twisted pair cables. The ETOF digitizing system consists of 2 VME crates each of which contains modules of time digitizing, clock, trigger and fast control etc. The time digitizing module (TDIG) of this prototype can support up to 72 electrical channels of hit information measurement. The fast control (FCTL) module can operate at barrel or endcap mode. The barrel FCTL fans fast control signals from the trigger system out to endcap FCTLs, merges data from endcaps and transfers to the trigger system. Without modifying the barrel TOF structure, this time digitizing architecture benefits for improving ETOF performance without degrading barrel TOF measuring. Lab experiments show that the time resolution of this digitizing system can be less than 20ps, and the data throughput to DAQ can be about 92Mbps. Beam experiments show that the complete time resolution can be less than 45ps.

Cao Ping; Sun Wei-Jia; Ji Xiao-Lu; Fan Huan-Huan; Wang Si-Yu; Liu Shu-Bin; An Qi

2013-05-30T23:59:59.000Z

419

Extension - Upgrading Methane Using Ultra-Fast Thermal Swing Adsorption  

SciTech Connect (OSTI)

The need for cost effective technologies for upgrading coal mine methane to pipeline quality natural gas is becoming ever greater. The current work presents and investigates a new approach to reduce the impact of the most costly step in the conventional technology, nitrogen rejection. The proposed approach is based on the Velocys microchannel platform, which is being developed to commercialize compact and cost efficient chemical processing technology. For this separation, ultra fast thermal swing sorption is enabled by the very high rates of heat and mass transfer inherent in microchannel processing. In a first phase of the project solid adsorbents were explored. Feasibility of ultrafast thermal swing was demonstrated but the available adsorbents had insufficient differential methane capacity to achieve the required commercial economics. In a second phase, ionic liquids were adopted as absorbents of choice, and experimental work and economic analyses, performed to gauge their potential, showed promise for this novel alternative. Final conclusions suggest that a combination of a required cost target for ionic liquids or a methane capacity increase or a combination of both is required for commercialization.

Anna Lee Tonkovich

2008-08-11T23:59:59.000Z

420

Micromegas chambers for the ATLAS Muon Spectrometer Upgrade  

E-Print Network [OSTI]

Micromegas (Micro MEsh Gaseous Structure) chambers have been proven along the years to be reliable fast detectors with an excellent spatial resolution. The ATLAS collaboration at LHC has chosen the micromegas technology along with the small-strip Thin Gap Chambers (sTGC) for the high luminosity upgrade of the inner muon station in the high-rapidity region, the so called New Small Wheel (NSW). It employs eight layers of micromegas detectors and eight layers of sTGC. The NSW project requires fully efficient micromegas chambers with spatial resolution down to $100\\mu m$ over a total active area of $1200 m^2$ with a rate capability up to $10 kHz/cm^2$ and operation in a moderate magnetic field up to B=0.3 T. The required tracking capability is provided by the intrinsic space resolution combined with a mechanical precision at the level of $30 \\mu m$ along the precision coordinate. Moreover together with the precise tracking capability the micromegas chambers should provide a trigger signal. An extensive R&D pr...

Ntekas, Konstantinos; The ATLAS collaboration

2014-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "rock grounding upgrades" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Booster Synchrotron RF System Upgrade for SPEAR3  

SciTech Connect (OSTI)

Recent progress at the SPEAR3 includes the increase in stored current from 100 mA to 200 mA and top-off injection to allow beamlines to stay open during injection. Presently the booster injects 3.0 GeV beam to SPEAR3 three times a day. The stored beam decays to about 150 mA between the injections. The growing user demands are to increase the stored current to the design value of 500 mA, and to maintain it at a constant value within a percent or so. To achieve this goal the booster must inject once every few minutes. For improved injection efficiency, all RF systems at the linac, booster and SPEAR3 need to be phase-locked. The present booster RF system is basically a copy of the SPEAR2 RF system with 358.5 MHz and 40 kW peak RF power driving a 5-cell RF cavity for 1.0 MV gap voltage. These requirements entail a booster RF system upgrade to a scaled down version of the SPEAR3 RF system of 476.3 MHz with 1.2 MW cw klystron output power capabilities. We will analyze each subsystem option for their merits within budgetary and geometric space constraints. A substantial portion of the system will come from the decommissioned PEP-II RF stations.

Park, Sanghyun; /SLAC; Corbett, Jeff; /SLAC

2012-07-06T23:59:59.000Z

422

Co-processing studied for upgrading low grade feedstocks  

SciTech Connect (OSTI)

In the future refiners will have to consider processing bottom-of-the-barrel feedstocks to a much greater extent. A serious decline in light oil production and light oil find rates in the Western Hemisphere and in the North Sea, along with the politically-controlled availability of Middle East petroleum supplies, indicate that there is a need for technology that will give the refiner greater flexibility in feedstock selection and processability. At the American Chemical Society's Spring Conference in New York, Lummus Crest, Inc. (LCI) presented a paper on the co-processing of petroleum feedstocks with other more plentiful and less costly fuels, one route to satisfying the refiners' needs. LCI has formulated a concept for co-processing bottom-of-the-barrel oils with coal and other solid carbonaceous feedstocks to produce high quality distillate fuels. The concept is based on a two-stage approach in which the solid carbonaceous feedstocks are converted to liquids in a thermal reaction zone without any externally-supplied catalysts followed by catalytic hydroprocessing of the thermal stage products together with petroleum in an expanded-bed hydrotreater. The unconverted solids from the thermal reactor can be removed by known solids separation techniques, such as Anti-Solvent Deashing (ASDA), prior to upgrading in the expanded-bed hydrotreater. A distillate fraction from the hydrotreater can be recycled to serve as the slurry vehicle for the solid carbonaceous feedstock.

Not Available

1986-09-01T23:59:59.000Z

423

Linac cryogenic distribution system maintenance and upgrades at JLab  

SciTech Connect (OSTI)

The Central Helium Liquefier (CHL) distribution system to the CEBAF and FEL linacs at Jefferson Lab (JLab) experienced a planned warm up during the late summer and fall of 2012 for the first time after its commissioning in 1991. Various maintenance and modifications were performed to support high beam availability to the experimental users, meet 10 CFR 851 requirements for pressure systems, address operational issues, and prepare the cryogenic interfaces for the high-gradient cryomodules needed for the 12 GeV upgrade. Cryogenic maintenance and installation work had to be coordinated with other activities in the linacs and compete for manpower from other department installation activities. With less than a quarter of the gas storage capacity available to handle the boil-off from the more than 40 cryomodules, 35,000 Nm{sup 3} of helium was re-liquefied and shipped to a vendor via a liquid tanker trailer. Nearly 200 u-tubes had to be removed and stored while seals were replaced on related equipment such as vacuum pump outs, bayonet isolation and process valves.

Dixon, K.; Wright, M.; Ganni, V. [Thomas Jefferson National Accelerator Facility (JLab), Newport News, VA 23606 (United States)

2014-01-29T23:59:59.000Z

424

Linac cryogenic distribution system maintenance and upgrades at Jlab  

SciTech Connect (OSTI)

The Central Helium Liquefier (CHL) distribution system to the CEBAF and FEL linacs at Jefferson Lab (JLab) experienced a planned warm up during the late summer and fall of 2012 for the first time after its commissioning in 1991. Various maintenance and modifications were performed to support high beam availability to the experimental users, meet 10 CFR 851 requirements for pressure systems, address operational issues, and prepare the cryogenic interfaces for the high-gradient cryomodules needed for the 12 GeV upgrade. Cryogenic maintenance and installation work had to be coordinated with other activities in the linacs and compete for manpower from other department installation activities. With less than a quarter of the gas storage capacity available to handle the boil-off from the more than 40 cryomodules, 35,000 Nm{sup 3} of helium was re-liquefied and shipped to a vendor via a liquid tanker trailer. Nearly 200 u-tubes had to be removed and stored while seals were replaced on related equipment such as vacuum pump outs, bayonet isolation and process valves.

Dixon, Kelly D. [JLAB; Wright, Mathew C. [JLAB; Ganni, Venkatarao [JLAB

2014-01-01T23:59:59.000Z

425

Study of GSO scintillator for the LHCf upgrade  

SciTech Connect (OSTI)

The GSO scintillator has a very excellent radiation resistance, fast decay time and large amounts of light yield. Because of these features, GSO will be used to upgrade the current LHCf detector. We examined the features of GSO by using heavy ion beam at Heavy Ion Medical Accelerator in Chiba (HIMAC) Japan. The linearity of PMT R7400 for the large light yield of GSO with a {sup 132}Xe beam and the radiation hardness with a {sup 12}C beam were measured. As a result, GSO scintillator showed a good linearity up to the signal corresponding to 6 TeV EM-shower maximum in the LHCf detector, and a good radiation hardness up to 7x10{sup 5} Gy. For the LHCf Arm1 detector, small scaled GSO crystals (GSO bars), have been fabricated for the position determination detector. 5 GSO bars have been manufactured and its performance have been evaluated using {sup 12}C beam. Its light yield and position dependency have been evaluated.

Kawade, K.; Fukatsu, K.; Itow, Y.; Mase, T.; Masuda, K.; Matsubara, Y.; Mitsuka, G.; Sako, T.; Suzuki, K.; Taki, K. [Solar-Terrestrial Environment Laboratory, Nagoya University, Nagoya (Japan); Suzuki, T.; Kasahara, K.; Nakai, M.; Torii, S. [Research Institute for Science and Engineering, Waseda University, Tokyo (Japan); Adriani, O.; Bonechi, L.; D'Alessandro, R. [Universita degli Studi di Firenze and INFN Sezione di Firenze, Firenze (Italy); Bongi, M.; Menjo, H.; Papini, P. [INFN Sezione di Firenze, Firenze (Italy)

2011-09-22T23:59:59.000Z

426

High Resolution BPM Upgrade for the ATF Damping Ring at KEK  

E-Print Network [OSTI]

A beam position monitor (BPM) upgrade at the KEK Accelerator Test Facility (ATF) damping ring has been accomplished, carried out by a KEK/FNAL/SLAC collaboration under the umbrella of the global ILC R&D effort. The upgrade consists of a high resolution, high reproducibility read-out system, based on analog and processing, and also implements a new automatic gain error correction schema. The technical concept and realization as well as results of beam studies are presented.

Eddy, N; Fellenz, B; Gianfelice-Wendt, E; Prieto, P; Rechenmacher, R; Semenov, A; Voy, D; Wendt, M; Zhang, D; Terunuma, N; Urakawa, J

2012-01-01T23:59:59.000Z

427

Understanding Through-Composition in Post-Rock, Math-Metal, and other Post-Millennial Rock Genres  

E-Print Network [OSTI]

Since the dawn of experimental rock’s second coming in the new millennium, experimental artists have begun distancing themselves from Top-40 artists through formal structures that eschew recapitulatory verse/chorus ...

Osborn, Brad

2011-01-01T23:59:59.000Z

428

Effect of faulting on ground-water movement in the Death Valley region, Nevada and California  

SciTech Connect (OSTI)

This study characterizes the hydrogeologic system of the Death Valley region, an area covering approximately 100,000 square kilometers. The study also characterizes the effects of faults on ground-water movement in the Death Valley region by synthesizing crustal stress, fracture mechanics,a nd structural geologic data. The geologic conditions are typical of the Basin and Range Province; a variety of sedimentary and igneous intrusive and extrusive rocks have been subjected to both compressional and extensional deformation. Faulting and associated fracturing is pervasive and greatly affects ground-water flow patterns. Faults may become preferred conduits or barriers to flow depending on whether they are in relative tension, compression, or shear and other factors such as the degree of dislocations of geologic units caused by faulting, the rock types involved, the fault zone materials, and the depth below the surface. The current crustal stress field was combined with fault orientations to predict potential effects of faults on the regional ground-water flow regime. Numerous examples of fault-controlled ground-water flow exist within the study area. Hydrologic data provided an independent method for checking some of the assumptions concerning preferential flow paths. 97 refs., 20 figs., 5 tabs.

Faunt, C.C.

1997-12-31T23:59:59.000Z

429

Pulsed power supply for Nova Upgrade. Final report, August 1, 1991 to March 31, 1992  

SciTech Connect (OSTI)

This report describes work carried out at the Center for Electromechanics at The University of Texas at Austin (CEM-UT). A baseline design of the Nova Upgrade has been completed by Lawrence Livermore National Laboratory. The Nova Upgrade is an 18 beamline Nd: glass laser design utilizing fully relayed 4x4 30 cm aperture segmented optical components. The laser thus consists of 288 independent beamlets nominally producing 1.5 to 2.0 MJ of 0.35 {mu}m light in a 3 to 5 ns pulse. The laser design is extremely flexible and will allow a wide range of pulses to irradiate ICF targets. This facility will demonstrate ignition/gain and the scientific feasibility of ICF for energy and defense applications. The pulsed power requirements for the Nova Upgrade are given. CEM-UT was contracted to study and develop a design for a homopolar generator/inductor (HPG/inductor) opening switch system which would satisfy the pulsed power supply requirements of the Nova Upgrade. The Nd:glass laser amplifiers used in the Nova Upgrade will be powered by light from xenon flashlamps. The pulsed power supply for the Nova Upgrade powers the xenon flashlamps. This design and study was for a power supply to drive flashlamps.

Bacon, J.L.; Kajs, J.P.; Walls, A.; Weldon, W.F.; Zowarka, R.C. [Univ. of Texas, Austin, TX (US). Center for Electromechanics] [Univ. of Texas, Austin, TX (US). Center for Electromechanics

1992-12-31T23:59:59.000Z

430

LANL breaks ground on key sediment control project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Sediment control project Sediment control project LANL breaks ground on key sediment control project Called "grade-control" structures, the approximately $2 million features are up to eight feet high and made of rocks packed tightly into wire enclosures. November 5, 2009 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials.

431

Broadband Ground-Plane Cloak  

Science Journals Connector (OSTI)

...automated design process. The ground-plane...Maxwell's equations implies that...number of simulations of the metamaterial...cloak-design process and makes...Jacobian matrix {lambda...Jacobian matrix). In our...retrieval process, modified...numerical simulation. A regression...a single Matlab program...Adobe Acrobat PDF format...

R. Liu; C. Ji; J. J. Mock; J. Y. Chin; T. J. Cui; D. R. Smith

2009-01-16T23:59:59.000Z

432

Cooking with Ground Pork (Spanish)  

E-Print Network [OSTI]

? 10 minutos, o hasta que las tiras de tortilla est?n suaves. S?rvalo caliente. Adaptado de Commodity Fact Sheet for USDA Household Programs: Frozen Ground Pork (folleto de informaci?n sobre productos preparado para los Programas del Hogar del...

Anding, Jenna

2008-12-09T23:59:59.000Z

433

Rock River Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Wind Farm Wind Farm Jump to: navigation, search Name Rock River Wind Farm Facility Rock River Wind Farm Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Shell Wind Energy Developer SeaWest Energy Purchaser PacifiCorp Location Arlington and Carbon Counties WY Coordinates 41.6996°, -107.003° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.6996,"lon":-107.003,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

434

A Phased Array Approach to Rock Blasting  

SciTech Connect (OSTI)

A series of laboratory-scale simultaneous two-hole shots was performed in a rock simulant (mortar) to record the shock wave interference patterns produced in the material. The purpose of the project as a whole was to evaluate the usefulness of phased array techniques of blast design, using new high-precision delay technology. Despite high-speed photography, however, we were unable to detect the passage of the shock waves through the samples to determine how well they matched the expected interaction geometry. The follow-up mine-scale tests were therefore not conducted. Nevertheless, pattern analysis of the vectors that would be formed by positive interference of the shockwaves from multiple charges in an ideal continuous, homogeneous, isotropic medium indicate the potential for powerful control of blast design, given precise characterization of the target rock mass.

Leslie Gertsch; Jason Baird

2006-07-01T23:59:59.000Z

435

Gage for measuring displacements in rock samples  

DOE Patents [OSTI]

A gage for measuring diametral displacement within a rock sample for use in a rock mechanics laboratory and in the field, comprises a support ring housing a linear variable differential transformer, a mounting screw, and a leaf spring. The mounting screw is adjustable and defines a first point of contact with the rock sample. The leaf spring has opposite ends fixed to the inner periphery of the mounting ring. An intermediate portion of the leaf spring projecting radially inward from the ring is formed with a dimple defining a second point of contact with the sample. The first and second points of contact are diametrically opposed to each other. The LVDT is mounted in the ring with its axis parallel to the line of measurement and its core rod received in the dimple of the leaf spring. Any change in the length of the line between the first and second support points is directly communicated to the LVDT. The leaf spring is rigid to completely support lateral forces so that the LVDT is free of all load for improved precision.

Holcomb, David J. (Albuquerque, NM); McNamee, Michael J. (Albuquerque, NM)

1986-01-01T23:59:59.000Z

436

Category:Rock Lab Analysis | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Category Edit History Facebook icon Twitter icon » Category:Rock Lab Analysis Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermalpower.jpg Looking for the Rock Lab Analysis page? For detailed information on exploration techniques, click here. Category:Rock Lab Analysis Add.png Add a new Rock Lab Analysis Technique Pages in category "Rock Lab Analysis" The following 9 pages are in this category, out of 9 total. C Core Analysis Cuttings Analysis I Isotopic Analysis- Rock O Over Core Stress P Paleomagnetic Measurements Petrography Analysis R Rock Density X X-Ray Diffraction (XRD) X-Ray Fluorescence (XRF)

437

TWO-DIMENSIONAL MODELING OF LASER SPALLATION DRILLING OF ROCKS  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DIMENSIONAL MODELING OF LASER SPALLATION DRILLING OF ROCKS DIMENSIONAL MODELING OF LASER SPALLATION DRILLING OF ROCKS P532 Zhiyue Xu, Yuichiro Yamashita 1 , and Claude B. Reed Argonne National Laboratory, Argonne, IL 60439, USA 1 Now with Kyushu University, Japan Abstract High power lasers can weaken, spall, melt and vaporize natural earth materials with thermal spallation being the most energy efficient rock removal mechanism. Laser rock spallation is a very complex phenomenon that depends on many factors. Computer numerical modeling would provides great tool to understand the fundamental of this complex phenomenon, which is crucial to the success of its applications. Complexity of modeling laser rock spallation is due to: 1) rock is a porous media, to which traditional theories of heat transfer and rock mechanics can not be directly

438

HFC-6000 for Nuclear I and C Upgrade  

SciTech Connect (OSTI)

The scalability of the HFC-6000 product line makes it an effective solution for nuclear power plant I and C upgrade applications. Its 19-in. rack-mounted platform provides a modular structure whose components can be used for many different nuclear power plant safety applications. This single-platform solution reduces the overall complexity of I and C implementation by minimizing operational and maintenance requirements. The HFC-6000 product line is designed to operate with either single or multiple control remote units in each channel. The main controller module in a remote unit is the system controller (HFCSBC06), which executes control logic programs, I/O scan, and C-Link communication. All three functions are handled by dedicated 64/32-bit microprocessors. A redundant configuration of system controllers consists of two HFC-SBC06 modules and one HFC-DPM06 dual-ported memory module. The hardware interface with external peripheral equipment is provided by an HFC-PCC06 peripheral interface module in the same rack. This module communicates with dedicated Control Switch Modules (the operator interface for digital control) and M/A stations (the operator interface for analog control), which are mounted on the plant main control board. Individual input/output modules serve as the hardware interface with the field devices under control and are implemented by different types of I/O modules. Each I/O module has a redundant serial communication interface. This serial interface employs a proprietary poll-response intercommunication link (ICL) protocol for communication with the system controllers. When a remote is configured with redundant controllers, the two ICL interfaces on each I/O module are connected to separate system controllers to create a redundant link. The I/O modules can be installed locally or remotely. If the I/O modules are physically remote from the controller, the ICL can be implemented with fiber optics to provide physical and electrical isolation from non-safety components. An HFC-FPD06 Flat Panel Display Module can be used as a human-machine interface (HMI). This HMI is composed of a qualified flat panel display and an HFC-FPC06 FPD controller. The FPC06 module has hardware interfaces for both the ICL and the fast Ethernet C-Link. It is configured as a subordinate to the HFC-SBC06 system controller and controls graphic displays on the HMI; it can also perform data voting and validation functions for redundant or triple redundant safety channels. The HFC-FPC06 can be used in either single or redundant configurations. The Power Supply Module consists of a redundant, rack-mounted power supply set. The typical configuration provides 24-vdc for all logic functions and 48-vdc for excitation power. Individual power supplies are redundant and hot swappable. Currently, HFC-6000 system is being installed in Kori Units no.1 to no.4 for its AAC D/G control and monitoring system and several other NPP I and C upgrade projects. (authors)

Taylor, Jonathan; Hsu, Allen; Gerardis, Terry; Stevens, John; McCreary, Tim; Yang, Steve [HF Controls Corporation, 16650 Westgrove Dr., Suite 500s (United States)

2006-07-01T23:59:59.000Z

439

Non-thermal plasma enhanced heavy oil upgrading  

Science Journals Connector (OSTI)

Abstract A process was proposed for upgrading heavy oil using non-thermal plasma technology in a conventional thermal cracking system under atmospheric pressure. Results from a comparison of the reactivity of a N2, H2 and CH4 plasma showed that the plasma can increase the trap oil yield significantly. The trap oil yield increased by ?9% when the N2 plasma was applied and showed a further increase of ?19% when the H2 or CH4 plasma was applied. A detailed study on the H2 plasma-enhanced upgrading process was carried out and the results showed that the trap oil yields of the plasma-on runs can be 8–33% higher than those of the plasma-off runs, depending on experimental conditions. Compared with the plasma-off runs, trap oil from the plasma-on runs had a higher (H/C)atomic but less heteroatoms (S and N). Over-balanced hydrogen in the products from plasma-on runs revealed the H2 plasma reactivity, which was further demonstrated by an increase in the substitution and condensation indices of trap oil from the plasma-on runs. Although thermal cracking was mainly involved whether the plasma was applied or not, the electrical field for generating the plasma and the generated plasma may assist with hydrocarbon bond cleavage. This was shown by the increased trap oil yield with the N2 plasma and the hydrogen and carbon residue distribution. Compared with the feedstock, more aromatic and ?-hydrogen (HA and H?, respectively) and less ?- and ?-hydrogen (H? and H?, respectively) were present in the residues, which agrees with the bond dissociation energy data. Similarly, the amounts of saturated (Cs) and alkyl (Cp) carbons in the residues were significantly lower than those in the feedstock while the amount of aromatic carbons (Ca) in the residues was higher than the feedstock. The changes in hydrogen and carbon distribution were more significant for the plasma-on runs. This implies that mainly side chain losses and bridged bond breakage are involved in the processes. This was demonstrated further by the molecular weight distribution. In general, the molecular weight of the residues was lower than that of the feedstock, especially for residues from the plasma-on runs. However, compared with the feedstock, the residues contained less saturated, aromatic and resin fractions but more asphaltene and toluene insoluble fractions. This implies that intra-molecular condensation was more significant than inter-molecular condensation, especially in the plasma-on runs. This should be attributed to the higher stabilization ability of the H2 plasma for fragments or radicals and gas (plasma) flow by which the fragments or radicals are separated rapidly.

Haigang Hao; Bao S. Wu; Jianli Yang; Qiang Guo; Yong Yang; Yong W. Li

2014-01-01T23:59:59.000Z

440

AN APPLICATION OF GAME THEORY: FUNDING INTERDEPENDENT MC and A UPGRADE DECISIONS  

SciTech Connect (OSTI)

Funding Material, Control and Accountability (MC&A) system upgrades has been identified as a partial solution for mitigating the diversion threat of weapons-grade nuclear material. Effective MC&A system upgrades are dependent on appropriate decisions based on based on funding, implementation, operation and oversight. Traditional MC&A upgrade decisions inherently assumed that all decision-makers possessed similar payoff vectors allowing for a fairly consistent and unified approach to MC&A system enhancements; however, MC&A upgrade projects in non-traditional environments may be required to take into account situations where the potential payoff vectors among decision-makers may be significantly different. Once a decision-maker is required to take into account the decisions of others, the process can be modeled as a game. Game theory has been previously be used to shed light on many aspects of social and economic behavior where a payoff from a set of strategies is dependent on the strategy of others. In this paper, the application of game theory in the context of MC&A upgrades is discussed. Various MC&A upgrades decision payoff matrices for relevant circumstances are evaluated for static (simultaneous) and dynamic (sequential decisions) games. Optimal strategies and equilibrium conditions for these payoff matrices are analyzed. Additional game factors (bargaining, uncertain outcomes, moral hazards) that may affect the outcome of the game are briefly discussed. By demonstrating the application of game theory to a nontraditional environment that may require MC&A upgrades, this work increases the understanding out how outcomes are logically connected to the respective value decision-makers assign to choices.

B. G. SCOTT

2001-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "rock grounding upgrades" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Design review report: 200 East upgrades for Project W-314, tank farm restoration and safe operations  

SciTech Connect (OSTI)

This Design Review Report (DRR) documents the contractor design verification methodology and records associated with project W-314`s 200 East (200E) Upgrades design package. The DRR includes the documented comments and their respective dispositions for this design. Acceptance of the comment dispositions and closure of the review comments is indicated by the signatures of the participating reviewers. Project W-314 is a project within the Tank Waste Remediation System (TWRS) Tank Waste Retrieval Program. This project provides capital upgrades for the existing Hanford tank farm waste transfer, instrumentation, ventilation, and electrical infrastructure systems. To support established TWRS programmatic objectives, the project is organized into two distinct phases. The initial focus of the project (i.e., Phase 1) is on waste transfer system upgrades needed to support the TWRS Privatization waste feed delivery system. Phase 2 of the project will provide upgrades to support resolution of regulatory compliance issues, improve tank infrastructure reliability, and reduce overall plant operating/maintenance costs. Within Phase 1 of the W-314 project, the waste transfer system upgrades are further broken down into six major packages which align with the project`s work breakdown structure. Each of these six sub-elements includes the design, procurement, and construction activities necessary to accomplish the specific tank farm upgrades contained within the package. The first design package (AN Valve Pit Upgrades) was completed in November 1997, and the associated design verification activities are documented in HNF-1893. The second design package, 200 East (200E) Upgrades, was completed in March 1998. This design package identifies modifications to existing valve pits 241-AX-B and 241-A-B, as well as several new waste transfer pipelines to be constructed within the A Farm Complex of the 200E Area. The scope of the valve pit modifications includes new pit cover blocks, valve manifolds, leak detectors, and special protective coatings similar to those previously approved for the AN Valve Pit Upgrades design package. The new transfer lines included in this package (with official line number designations) are described within.

Boes, K.A.

1998-04-15T23:59:59.000Z

442

Development of hydrothermal liquefaction and upgrading technologies for lipid-extracted algae conversion to liquid fuels  

Science Journals Connector (OSTI)

Abstract Bench-scale tests were performed for lipid-extracted microalgae (LEA) conversion to liquid fuels via hydrothermal liquefaction (HTL) and upgrading processes. Process simulation and economic analysis for a large-scale LEA HTL and upgrading system were developed based on the best available experimental results. The system assumed an LEA feed rate of 608 dry metric tons/day and that the feedstock was converted to a crude HTL bio-oil and further upgraded via hydrotreating and hydrocracking to produce liquid fuels, mainly alkanes. Performance and cost results demonstrated that HTL and upgrading is effective for converting LEA to liquid fuels. The liquid fuels annual yield was estimated to be 26.9 million gallon gasoline-equivalent (GGE) and the overall energy efficiency on a higher heating value (HHV) basis was estimated to be 69.5%. The variation range of the minimum fuel selling price (MFSP) was estimated to be $2.07 to $7.11/GGE by combining the effects of selected process factors. Key factors affecting the production cost were identified to be the LEA feedstock cost, final products yields, and the upgrading equipment cost. The impact of plant scale on MFSP was also investigated.

Yunhua Zhu; Karl O. Albrecht; Douglas C. Elliott; Richard T. Hallen; Susanne B. Jones

2013-01-01T23:59:59.000Z

443

U.S.-Russia MPC and A upgrades at the Beloyarsk Nuclear Power Plant  

SciTech Connect (OSTI)

During the January 1996 meeting of the Gore-Chernomyrdin Commission, the Beloyarsk Nuclear Power Plant (BNPP) was identified as one of the additional sites for cooperative projects on upgrading Materials Protection, Control and Accounting (MPC and A). Since June 1996, Sandia National Laboratories (SNL), Pacific Northwest National Laboratories (PNNL), and Los Alamos National Laboratory (LANL) have worked with BNPP to upgrade MPC and A at the facility. Some unique challenges were encountered because BNPP has an operating BN-600 600-Megawatt breeder reactor. SNL has been responsible for working with BNPP to implement physical protection upgrades to the Central Alarm Station, Fresh Fuel Storage building, Spent Fuel Storage Area, and Vehicle/Personnel Portal. In addition, improved communication equipment for the Ministry of the Interior (MVD) guards and training of personnel were provided. PNNL has been responsible for coordinating Material Control and Accounting (MC and A) upgrades at BNPP. PNNL, in conjunction with LANL, has implemented such MC and A upgrades as a computerized nuclear materials accounting system, training in MC and A elements, nondestructive assay instrumentation for fresh fuel, installation of a fork detector for measuring spent fuel, and installation of an underwater video camera for verification of spent fuel serial numbers.

Saraev, O. [Beloyarsk Nuclear Power Plant, Zarechny (Russian Federation); Haase, M.; Smarto, C. [Dept. of Energy, Washington, DC (United States); Mikkelsen, K.; Heinberg, C. [Pacific Northwest National Labs., Richland, WA (United States); Showalter, R.; Soo Hoo, M. [Sandia National Labs., Albuquerque, NM (United States); Hatcher, C.; Forehand, M. [Los Alamos National Lab., NM (United States)

1998-08-01T23:59:59.000Z

444

CMS hadron calorimeter front-end upgrade for SLHC phase I  

SciTech Connect (OSTI)

We present an upgrade plan for the CMS HCAL detector. The HCAL upgrade is required for the increased luminosity (3 * 10E34) of SLHC Phase I which is targeted for 2014. A key aspect of the HCAL upgrade is to add longitudinal segmentation to improve background rejection, energy resolution, and electron isolation at the L1 trigger. The increased segmentation is achieved by replacing the hybrid photodiodes (HPDs) with silicon PMTs (SIPMs). We plan to instrument each fiber of the calorimeter with an SIPM (103,000 total). We will then electrically sum outputs from selected SIPMs to form the longitudinal readout segments. In addition to having more longitudinal information, the upgrade plans include a new custom ADC with matched sensitivity and timing information. The increased data volume requires higher speed transmitters and the additional power dissipation for the readout electronics requires better thermal design, since much of the on-detector infrastructure (front-end electronics crates, cooling pipes, optical fiber plant, etc.) will remain the same. We will report on the preliminary designs for these upgraded systems, along with performance requirements and initial design studies.

Whitmore, Juliana; /Fermilab

2009-09-01T23:59:59.000Z

445

Progress on the upgrade of the CMS Hadron Calorimeter Front-End electronics  

SciTech Connect (OSTI)

We present a scheme to upgrade the CMS HCAL front-end electronics in the second long shutdown to upgrade the LHC (LS2), which is expected to occur around 2018. The HCAL electronics upgrade is required to handle the major instantaneous luminosity increase (up to 5 * 10{sup 34} cm{sup -2} s{sup -1}) and an expected integrated luminosity of {approx}3000 fb{sup -1}. A key aspect of the HCAL upgrade is to read out longitudinal segmentation information to improve background rejection, energy resolution, and electron isolation at the L1 trigger. This paper focuses on the requirements for the new electronics and on the proposed solutions. The requirements include increased channel count, additional timing capabilities, and additional redundancy. The electronics are required to operate in a harsh environment and are constrained by the existing infrastructure. The proposed solutions span from chip level to system level. They include the development of a new ASIC ADC, the design and testing of higher speed transmitters to handle the increased data volume, the evaluation and use of circuits from other developments, evaluation of commercial FPGAs, better thermal design, and improvements in the overall readout architecture. We will report on the progress of the designs for these upgraded systems, along with performance requirements and initial design studies.

Anderson, Jake; Whitmore, Juliana; /Fermilab

2011-11-01T23:59:59.000Z

446

Size distribution functions for rock fragments  

Science Journals Connector (OSTI)

Abstract The capacity of 17 functions to represent the size distribution of fragmented rock is assessed on 1234 data sets of screened fragments from blasted and crushed rock of different origins, of sizes ranging from 0.002 to 2000 mm. The functions evaluated are Weibull, Grady, log-normal, log-logistic and Gilvarry, in their plain, re-scaled and bi-component forms, and also the Swebrec distribution and its bi-component extension. In terms of determination coefficient, the Weibull is the best two-parameter function for describing rock fragments, with a median R2 of 0.9886. Among re-scaled, three-parameter distributions, Swebrec and Weibull lead with median R2 values of 0.9976 and 0.9975, respectively. Weibull and Swebrec distributions tie again as best bi-component, with median R2 of 0.9993. Re-scaling generally reduces the unexplained variance by a factor of about four with respect to the plain function; bi-components further reduce this unexplained variance by a factor of about two to three. Size-prediction errors are calculated in four zones: coarse, central, fines and very fines. Expected and maximum errors in the different ranges are discussed. The extended Swebrec is the best fitting function across the whole passing range for most types of data. Bimodal Weibull and Grady distributions follow, except for the coarse range, where re-scaled forms are preferable. Considering the extra difficulty in fitting a five-parameter function with respect to a three-parameter one, re-scaled functions are the best choice if data do not extend far below 20% passing. If the focus is on the fine range, some re-scaled distributions may still do (Weibull, Swebrec and Grady, with maximum errors of 15–20% at 8% passing), but serious consideration should be given to bi-component distributions, especially extended Swebrec, bimodal Weibull and bimodal Grady.

José A. Sanchidrián; Finn Ouchterlony; Pablo Segarra; Peter Moser

2014-01-01T23:59:59.000Z

447

High Temperature Calcination - MACT Upgrade Equipment Pilot Plant Test  

SciTech Connect (OSTI)

About one million gallons of acidic, hazardous, and radioactive sodium-bearing waste are stored in stainless steel tanks at the Idaho Nuclear Technology and Engineering Center (INTEC), which is a major operating facility of the Idaho National Engineering and Environmental Laboratory. Calcination at high-temperature conditions (600 C, with alumina nitrate and calcium nitrate chemical addition to the feed) is one of four options currently being considered by the Department of Energy for treatment of the remaining tank wastes. If calcination is selected for future processing of the sodium-bearing waste, it will be necessary to install new off-gas control equipment in the New Waste Calcining Facility (NWCF) to comply with the Maximum Achievable Control Technology (MACT) standards for hazardous waste combustors and incinerators. This will require, as a minimum, installing a carbon bed to reduce mercury emissions from their current level of up to 7,500 to <45 {micro}g/dscm, and a staged combustor to reduce unburned kerosene fuel in the off-gas discharge to <100 ppm CO and <10 ppm hydrocarbons. The staged combustor will also reduce NOx concentrations of about 35,000 ppm by 90-95%. A pilot-plant calcination test was completed in a newly constructed 15-cm diameter calciner vessel. The pilot-plant facility was equipped with a prototype MACT off-gas control system, including a highly efficient cyclone separator and off-gas quench/venturi scrubber for particulate removal, a staged combustor for unburned hydrocarbon and NOx destruction, and a packed activated carbon bed for mercury removal and residual chloride capture. Pilot-plant testing was performed during a 50-hour system operability test January 14-16, followed by a 100-hour high-temperature calcination pilot-plant calcination run January 19-23. Two flowsheet blends were tested: a 50-hour test with an aluminum-to-alkali metal molar ratio (AAR) of 2.25, and a 50-hour test with an AAR of 1.75. Results of the testing indicate that sodium-bearing waste can be successfully calcined at 600 C with an AAR of 1.75. Unburned hydrocarbons are reduced to less than 10 ppm (7% O2, dry basis), with >90% reduction of NOx emissions. Mercury removal by the carbon bed reached 99.99%, surpassing the control efficiency needed to meet MACT emissions standards. No deleterious impacts on the carbon bed were observed during the tests. The test results imply that upgrading the NWCF calciner with a more efficient cyclone separator and the proposed MACT equipment can process the remaining tanks wastes in 3 years or less, and comply with the MACT standards.

Richard D. Boardman; B. H. O'Brien; N. R. Soelberg; S. O. Bates; R. A. Wood; C. St. Michel

2004-02-01T23:59:59.000Z

448

Conceptual design report: Neutrino physics after the Main Injector upgrade  

SciTech Connect (OSTI)

The Main Injector will provide an unprecedented opportunity for challenging the Standard Model. The increased fluxes available from this essential upgrade make possible neutrino experiments of great power both at the Tevatron and at intermediate energies. With a factor of six increase in flux, experiments at higher energies probe with great sensitivity the electroweak sector, test QCD, and search for rare processes which could point the way to new physics. Such experiments can make simultaneous measurements of the Standard Model {rho} parameter and sin{sup 2} {theta}{sub W} to 0.25% and 0.6%, respectively. Measurements of the radiative corrections in electroweak physics will reveal physics at the TeV mass scale. {rho} probes the Higgs sector, and deviations from its expected value would be unambiguous signals of new phenomena and possibly our first clear window into physics beyond the Standard Model. Another way to quantify these corrections is through measurements of sin{sup 2} {theta}{sub W} in different processes; comparisons among an ensemble of precise electroweak measurements can then distinguish among alternatives and pin down the sources of new phenomena. Four processes likely to be important in the coming decade are the direct boson mass measurements, Z polarization asymmetries, atomic parity violation, and neutrino-nucleon scattering. Each of these processes has a different dependence on the various sources of new physics: such phenomena as multiple Z's, supersymmetry, or technicolor are just three of many possibilities. Neutral current measurements of sin{sup 2} {theta}{sub W} and {rho} have already provided constraints on m{sub t}; improved measurements will extend their reach and help us interpret the information from the colliders. QCD tests, especially those involving the structure function xF{sub 3}, can check two fundamental predictions of the theory: the dependence of the strong-coupling constant {alpha}{sub S}(Q{sup 2}) on Q{sup 2}, and the value (and Q{sup 2} dependence) of R{sub QCD} = {sigma}{sub L}/{sigma}{sub T}. A Main Injector experiment will check the scaling violation of the theory and provide solid measurements of the gluon distributions.

Bernstein, R.; Beverly, L.; Browning, F.; Childress, S.; Freeman, W.; Jacobsen, V.; Koizumi, G.; Krider, J.; Kula, L.; Malensek, A.; Pordes, Stephen H.; /Fermilab /Ohio State U.

1991-01-01T23:59:59.000Z

449

HYBRID SULFUR RECOVERY PROCESS FOR NATURAL GAS UPGRADING  

SciTech Connect (OSTI)

This second quarter report of 2002 describes progress on a project funded by the U.S. Department of Energy (DOE) to test a hybrid sulfur recovery process for natural gas upgrading. The process concept represents a low cost option for direct treatment of natural gas streams to remove H{sub 2}S in quantities equivalent to 0.2-25 metric tons (LT) of sulfur per day. This process is projected to have lower capital and operating costs than the competing technologies, amine/aqueous iron liquid redox and amine/Claus/tail gas treating, and have a smaller plant footprint, making it well suited to both on-shore and offshore applications. CrystaSulf (service mark of CrystaTech, Inc.) is a new nonaqueous sulfur recovery process that removes hydrogen sulfide (H{sub 2}S) from gas streams and converts it into elemental sulfur. CrystaSulf features high sulfur recovery similar to aqueous-iron liquid redox sulfur recovery processes, but differs from the aqueous processes in that CrystaSulf controls the location where elemental sulfur particles are formed. In the hybrid process, approximately 1/3 of the total H{sub 2}S in the natural gas is first oxidized to SO{sub 2} at low temperatures over a heterogeneous catalyst. Low temperature oxidation is done so that the H{sub 2}S can be oxidized in the presence of methane and other hydrocarbons without oxidation of the hydrocarbons. The project involves the development of a catalyst using laboratory/bench-scale catalyst testing, and then demonstration of the catalyst at CrystaTech's pilot plant in west Texas. Previous reports described development of a catalyst with the required selectivity and efficiency for producing sulfur dioxide from H{sub 2}S. In the laboratory, the catalyst was shown to be robust and stable in the presence of several intentionally added contaminants, including condensate from the pilot plant site. This report describes testing using the laboratory apparatus but operated at the pilot plant using the actual pilot plant gas, which contains far more contaminants than can be simulated in the laboratory. The results are very encouraging, with stable and efficient operation being obtained for a prolonged period of time.

Girish Srinivas; Steven C. Gebhard; David W. DeBerry

2002-07-01T23:59:59.000Z

450

Worldwide Occurrences of Arsenic in Ground Water  

Science Journals Connector (OSTI)

...decision-making process of water managers, remediation specialists, and...The geologic and ground-water conditions that promote...water managers, remediation specialists, and...The geologic and ground-water conditions that promote...

D. Kirk Nordstrom

2002-06-21T23:59:59.000Z

451

Montana Ground Water Assessment Act (Montana)  

Broader source: Energy.gov [DOE]

This statute establishes a program to systematically assess and monitor the state's ground water and to disseminate the information to interested persons in order to improve the quality of ground...

452

Warm or Steaming Ground | Open Energy Information  

Open Energy Info (EERE)

Warm or Steaming Ground Warm or Steaming Ground Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Print PDF Warm or Steaming Ground Dictionary.png Warm or Steaming Ground: An area where geothermal heat is conducted to the earth's surface, warming the ground and sometimes causing steam to form when water is present. Other definitions:Wikipedia Reegle Modern Geothermal Features Typical list of modern geothermal features Hot Springs Fumaroles Warm or Steaming Ground Mudpots, Mud Pools, or Mud Volcanoes Geysers Blind Geothermal System Steam rising from the ground at Eldvorp, a 10 km row of craters, in Southwestern Iceland. http://www.visiticeland.com/SearchResults/Attraction/eldvorp Warm or steaming ground is often an indicator of a geothermal system beneath the surface. In some cases a geothermal system may not show any

453

GPC behavior of metalloporphyrins from rock extract  

SciTech Connect (OSTI)

Nickel and vanadyl porphyrins present in rock extract from the vicinity of petroleum deposit in the Persian Gulf area were isolated by the combination of adsurption chromatography on silica gel and GPC on styrene-divinylbenzene copolymer. In order to study the GPC behavior of these metalloporphyrins, chromatographic fractions were collected and analyzed by UV/VIS absorption spectroscopy and mass spectrometry. The number of carbon atoms present in the porphine substituents and the different geometry of nickel and vanadyl ions in the molecule of metalloporphyrins were found to be the main factors influencing the GPC separation of these complexes. This chromatographic technique provided an effective separation of nickel from vanadylporphyrins.

Sebor, G.

1986-04-01T23:59:59.000Z

454

Earth science: Radon and rock deformation  

Science Journals Connector (OSTI)

... crustal deformation. This ‘unproven’ category includes the well-documented precursory decrease and increase of radon concentration before the 1978 Izu-Oshima earthquake in Japan (Fig. 1), as well ... local electric field. Trique et al. now report that various phenomena — bursts of radon gas, changes of electric potential, and departures of ground tilt from that predicted on ...

Evelyn Roeloffs

1999-05-13T23:59:59.000Z

455

Ground Source Heat Pump Demonstration Projects  

Broader source: Energy.gov [DOE]

Below are the project presentations and respective peer review results for Ground Source Heat Pump Demonstration Projects.

456

Ground Source Heat Pump Subprogram Overview  

Broader source: Energy.gov [DOE]

This overview of GTP's Ground Source Heat Pump subprogram was given at GTP's Program Peer Review on May 18, 2010.

457

North Village Ground Source Heat Pumps  

Broader source: Energy.gov [DOE]

Overview: Installation of Ground Source Heat Pumps. Replacement of Aging Heat Pumps. Alignment with Furmans Sustainability Goals.

458

Stability of ice-sheet grounding lines  

Science Journals Connector (OSTI)

...81 73 Stability of ice-sheet grounding lines Richard F. Katz 1 * M. Grae Worster 2...ice sheets are sensitive to grounding-line position and variation, characteristics...models. We present a theory for grounding-line dynamics in three spatial dimensions and...

2010-01-01T23:59:59.000Z

459

Study of Acid Response of Qatar Carbonate Rocks  

E-Print Network [OSTI]

STUDY OF ACID RESPONSE OF QATAR CARBONATE ROCKS A Thesis by ZHAOHONG WANG Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE... December 2011 Major Subject: Petroleum Engineering Study of Acid Response of Qatar Carbonate Rocks Copyright 2011 Zhaohong Wang STUDY OF ACID RESPONSE OF QATAR CARBONATE ROCKS A Thesis...

Wang, Zhaohong

2012-02-14T23:59:59.000Z

460

United States National Waste Terminal Storage argillaceous rock studies  

SciTech Connect (OSTI)

The past and present argillaceous rock studies for the US National Waste Terminal Storage Program consist of: (1) evaluation of the geological characteristics of several widespread argillaceous formations in the United States; (2) laboratory studies of the physical and chemical properties of selected argillaceous rock samples; and (3) two full-scale in situ surface heater experiments that simulate the emplacement of heat-generating radioactive waste in argillaceous rock.

Brunton, G.D.

1981-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "rock grounding upgrades" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Appliance Upgrades to Consider for Next Tax Season | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Appliance Upgrades to Consider for Next Tax Season Appliance Upgrades to Consider for Next Tax Season Appliance Upgrades to Consider for Next Tax Season April 15, 2013 - 2:28pm Addthis Solar energy systems are among the renewable and efficiency purchases that are eligible for tax credits. | Photo courtesy of Industrial Solar Technology Corp. Solar energy systems are among the renewable and efficiency purchases that are eligible for tax credits. | Photo courtesy of Industrial Solar Technology Corp. Erik Hyrkas Erik Hyrkas Media Relations Specialist, Office of Energy Efficiency & Renewable Energy What does this mean for me? If you missed the energy efficiency and renewable energy tax credits for 2012, you can still take advantage of them in 2013. Tax season comes to a close today, and if you missed the energy efficiency

462

Building Value with Energy-Saving Upgrades in Homes and Businesses |  

Broader source: Energy.gov (indexed) [DOE]

Building Value with Energy-Saving Upgrades in Homes and Businesses Building Value with Energy-Saving Upgrades in Homes and Businesses Building Value with Energy-Saving Upgrades in Homes and Businesses July 12, 2011 - 10:09am Addthis Eric Barendsen Energy Technology Program Specialist, Office of Energy Efficiency and Renewable Energy When I'm at a dinner party or going to a baseball game with friends, the conversation sometimes turns to what people are doing to improve their homes. As many of our readers have discovered on their own, improving the energy performance of your home can also make it more comfortable and attractive, increase its value, and help you save money on your energy bills. Remodeling a kitchen with granite countertops or stainless steel fixtures, for example, might make a home more attractive to a potential buyer. In the

463

Out With the Old, In With the New: New Hampshire Town to Upgrade Lighting |  

Broader source: Energy.gov (indexed) [DOE]

Out With the Old, In With the New: New Hampshire Town to Upgrade Out With the Old, In With the New: New Hampshire Town to Upgrade Lighting Out With the Old, In With the New: New Hampshire Town to Upgrade Lighting June 17, 2010 - 3:09pm Addthis Stephen Graff Former Writer & editor for Energy Empowers, EERE Newfields, New Hampshire's town hall has a lot of old-time charm worth keeping, with its steeple, rusted-red brick and chimney stacks, but the town lights are ready for a makeover. "Obviously, they don't have gas lamps from the 1800s," jokes Clay Mitchell, Newfields' town planner. "But the lights are old. In the town hall meeting room, they are awful. They are big, fat and hum when you turn them on." Now, with a $2,000 Energy Efficiency and Conservation Block Grant (EECBG) from the U.S. Department of Energy and New Hampshire Office of Energy and

464

Building Value with Energy-Saving Upgrades in Homes and Businesses |  

Broader source: Energy.gov (indexed) [DOE]

Building Value with Energy-Saving Upgrades in Homes and Businesses Building Value with Energy-Saving Upgrades in Homes and Businesses Building Value with Energy-Saving Upgrades in Homes and Businesses July 12, 2011 - 10:09am Addthis Eric Barendsen Energy Technology Program Specialist, Office of Energy Efficiency and Renewable Energy When I'm at a dinner party or going to a baseball game with friends, the conversation sometimes turns to what people are doing to improve their homes. As many of our readers have discovered on their own, improving the energy performance of your home can also make it more comfortable and attractive, increase its value, and help you save money on your energy bills. Remodeling a kitchen with granite countertops or stainless steel fixtures, for example, might make a home more attractive to a potential buyer. In the

465

NEPA CX Determination SS-SC-11-01 for SSRL Seismic Upgrade Phase 2  

Broader source: Energy.gov (indexed) [DOE]

1 for SSRL Seismic Upgrade Phase 2 1 for SSRL Seismic Upgrade Phase 2 National Environmental Policy Act (NEPA) Categorical Exclusion (CX) Determination A. SSO NEPA Control #: SS-SC-11-01 B. Brief Description of Proposed Action: The Stanford Synchrotron Radiation Lightsource (SSRL) is proposing to upgrade a portion of the existing Stanford Positron-Electron Asymmetric Ring (SPEAR) to meet seismic standards. The proposed work includes : 1) the replacement of concrete roof blocks, placement of footings and new concrete walls, and installation of seismic connections at the old Beam Line 4; 2) the replacement of existing concrete roof blocks with precast roof blocks, placement of new footings, and installation of seismic anchors and connections at the northeast section of the

466

Energy Upgrades to Save Small Arizona Town Big Money | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Upgrades to Save Small Arizona Town Big Money Upgrades to Save Small Arizona Town Big Money Energy Upgrades to Save Small Arizona Town Big Money July 19, 2010 - 1:00pm Addthis An aerial shot of Oro Valley, Ariz.'s town hall campus shows proposed solar locations. | Photo courtesy of Oro Valley An aerial shot of Oro Valley, Ariz.'s town hall campus shows proposed solar locations. | Photo courtesy of Oro Valley Temperatures above 100 degrees mean that staying cool and being energy efficient is important to the small town of Oro Valley, Ariz. But finding the funds to do both can be a challenge. It was this heat - and the availability of a federal grant - that Bayer Vella, the town's conservation and sustainability manager, cited as a reason the city is forging ahead with energy retrofits and solar projects.

467

Hydropower Upgrades to Yield Added Generation at Average Costs Less Than 4  

Broader source: Energy.gov (indexed) [DOE]

Hydropower Upgrades to Yield Added Generation at Average Costs Less Hydropower Upgrades to Yield Added Generation at Average Costs Less Than 4 cents per kWh - Without New Dams Hydropower Upgrades to Yield Added Generation at Average Costs Less Than 4 cents per kWh - Without New Dams November 4, 2009 - 12:00am Addthis WASHINGTON, DC - U.S. Energy Secretary Steven Chu today announced up to $30.6 million in Recovery Act funding for the selection of seven hydropower projects that modernize hydropower infrastructure by increasing efficiency and reducing environmental impacts at existing facilities. The expanded hydro generation projects have estimated incremental costs of less than 4 cents per kWh on average. The selections announced today will deploy innovative technologies such as high-efficiency, fish-friendly turbines, improved water intakes, and

468

Oak Ridge EM Program Upgrades Environmental Database for Public's Ease of  

Broader source: Energy.gov (indexed) [DOE]

Upgrades Environmental Database for Public's Upgrades Environmental Database for Public's Ease of Use Oak Ridge EM Program Upgrades Environmental Database for Public's Ease of Use October 30, 2013 - 12:00pm Addthis Oak Ridge’s environmental database contains data from more than 14 million field samples. These samples provide a clear picture of clean and contaminated areas at the site. Oak Ridge's environmental database contains data from more than 14 million field samples. These samples provide a clear picture of clean and contaminated areas at the site. OAK RIDGE, Tenn. - Oak Ridge is working to remediate contaminated areas in one of the EM program's most diverse and complex cleanup sites due to the research and production that occurred there during the Manhattan Project and Cold War. Oak Ridge employees use an array of tools to educate the public about the

469

Out With the Old, In With the New: New Hampshire Town to Upgrade Lighting |  

Broader source: Energy.gov (indexed) [DOE]

Out With the Old, In With the New: New Hampshire Town to Upgrade Out With the Old, In With the New: New Hampshire Town to Upgrade Lighting Out With the Old, In With the New: New Hampshire Town to Upgrade Lighting June 17, 2010 - 3:09pm Addthis Stephen Graff Former Writer & editor for Energy Empowers, EERE Newfields, New Hampshire's town hall has a lot of old-time charm worth keeping, with its steeple, rusted-red brick and chimney stacks, but the town lights are ready for a makeover. "Obviously, they don't have gas lamps from the 1800s," jokes Clay Mitchell, Newfields' town planner. "But the lights are old. In the town hall meeting room, they are awful. They are big, fat and hum when you turn them on." Now, with a $2,000 Energy Efficiency and Conservation Block Grant (EECBG) from the U.S. Department of Energy and New Hampshire Office of Energy and

470

Microsoft Word - CX-Big Eddy-TroutdaleUpgradeFY12_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

Erich Orth Erich Orth Project Manager - TEP-TPP-3 Proposed Action: Big Eddy - Troutdale No. 1 230 kV Transmission Line Upgrade Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): Appendix B4.13, Upgrading and Rebuilding Existing Powerlines. Location: Wasco, Hood River and Clackamas counties, OR Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The project, as proposed, is the thermal upgrade of the BPA Big Eddy - Troutdale No.1 230 kV Transmission Line: Background BPA's Big Eddy - Troutdale No. 1 230-kV transmission line is one of three major transmission lines that cross the Oregon Cascade Mountains. These lines transport The Dalles hydro generation and northwest wind generation output in the east to load centers west of the Cascades, like

471

Program Finds Unique Way to Fund Energy Upgrades | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Program Finds Unique Way to Fund Energy Upgrades Program Finds Unique Way to Fund Energy Upgrades Program Finds Unique Way to Fund Energy Upgrades May 4, 2010 - 11:11am Addthis Stephen Graff Former Writer & editor for Energy Empowers, EERE The $40 million of Recovery Acts funds used for weatherizing more than 6,500 homes over the next two years in Arkansas is a welcomed boost, but Martha Jane Murray of the Clinton Foundation is thinking bigger. "How do we create a more robust delivery system that is not just relying on federal dollars," asks Martha Jane, the program director for the foundation's Arkansas Clinton Climate Initiative (CCI AR). For CCI AR, one answer is the Home Energy Affordability Loan, or HEAL, program. In a unique approach to help chip away at the list of homes in need of weatherization and lower industrial energy consumption, CCI AR developed a

472

Homeowner Q&A: How I Benefitted from Energy Efficiency Upgrades |  

Broader source: Energy.gov (indexed) [DOE]

Homeowner Q&A: How I Benefitted from Energy Efficiency Upgrades Homeowner Q&A: How I Benefitted from Energy Efficiency Upgrades Homeowner Q&A: How I Benefitted from Energy Efficiency Upgrades August 14, 2013 - 4:33pm Addthis Pictured here is the knee wall in Seth Budick's daughter's room. While insulating behind the knee wall, Budick and his wife took advantage of the construction and added a built-in shelf -- an improvement that increased the room's comfort and storage. | Photo courtesy of Seth Budick. Pictured here is the knee wall in Seth Budick's daughter's room. While insulating behind the knee wall, Budick and his wife took advantage of the construction and added a built-in shelf -- an improvement that increased the room's comfort and storage. | Photo courtesy of Seth Budick. Rebecca Matulka Rebecca Matulka

473

Addendum to the Technical Design Report for the Upgrade of the ALICE Time Projection Chamber  

E-Print Network [OSTI]

This is the addendum to the TDR of the upgrade of the ALICE Time Projection Chamber (CERN-LHCC-2013-020 ; ALICE-TDR-016). The key objective of the upgrade is the replacement of the present MWPC-based readout chambers by detectors that allow continuous operation without active ion gating. In the TDR, we propose a solution that employs stacks of four Gas Electron Multipliers (GEMs) and demonstrate that it fulfills the design specifications, in particular in terms of intrinsic position resolution, energy resolution, and ion backflow. In this document we demonstrate with additional results from both detector R&D and simulations that the technological solution chosen in the TDR has sufficient safety margin for a successful campaign with the upgraded detector in RUN 3 and beyond.

The ALICE Collaboration

2015-01-01T23:59:59.000Z

474

Nuclear safety procedure upgrade project at USEC/MMUS gaseous diffusion plants  

SciTech Connect (OSTI)

Martin Marietta Utility Services has embarked on a program to upgrade procedures at both of its Gaseous Diffusion Plant sites. The transition from a U.S. Department of Energy government-operated facility to U.S. Nuclear Regulatory Commission (NRC) regulated has necessitated a complete upgrade of plant operating procedures and practices incorporating human factors as well as a philosophy change in their use. This program is designed to meet the requirements of the newly written 10CFR76, {open_quotes}The Certification of Gaseous Diffusion Plants,{close_quotes} and aid in progression toward NRC certification. A procedures upgrade will help ensure increased nuclear safety, enhance plant operation, and eliminate personnel procedure errors/occurrences.

Kocsis, F.J. III

1994-12-31T23:59:59.000Z

475

LHC luminosity upgrade with large Piwinski angle scheme: a recent look  

SciTech Connect (OSTI)

Luminosity upgrade at the LHC collider using longitudinally flat bunches in combination with the large crossing angle (large Piwinski angle scheme) is being studied with renewed interest in recent years. By design, the total beam-beam tune shift at the LHC is less than 0.015 for two interaction points together. But the 2010-11 3.5 TeV collider operation and dedicated studies indicated that the beam-beam tune shift is >0.015 per interaction point. In view of this development we have revisited the requirements for the Large Piwinski Angle scheme at the LHC. In this paper we present a new set of parameters and luminosity calculations for the desired upgrade by investigating: (1) current performance of the LHC injectors, (2) e-cloud issues on nearly flat bunches and (3) realistic beam particle distributions from longitudinal beam dynamics simulations. We also make some remarks on the needed upgrades on the LHC injector accelerators.

Bhat, C.M.; /Fermilab; Zimmermann, f.; /CERN

2011-09-01T23:59:59.000Z

476

Energy Star Building Upgrade Manual Heating and Cooling  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

9. Heating and 9. Heating and Cooling Revised January 2008 9.1 Overview 2 9.2 Central Cooling Systems 3 Chiller Plant Operations and Maintenance 4 Chiller Plant Retrofits 6 9.3 Central Heating Systems 10 Boiler System Operations and Maintenance 11 Boiler System Retrofits 11 Improving Furnace Efficiency 13 9.4 Unitary Systems 14 Packaged Rooftop Units 16 Split-System Packaged Units 18 Air-Source Heat Pumps 18 Ground-Source, Closed-Loop Heat Pumps 19 9.5 Additional Strategies 20 Air-Side Economizer 20 Energy Recovery 20 Desiccant Dehumidification 20 Night Precooling 21 Cool Storage 22 Evaporative Cooling 22 9.6 Summary 22 Bibliography 23 Glossary G-1 1 ENERGY STAR ® Building Manual ENERGY STAR ® Building Manual 9. Heating and Cooling 9.1 Overview Although heating and cooling systems provide a useful service by keeping occupants comfort-

477

Negative-potential operation of TMX-Upgrade  

SciTech Connect (OSTI)

A tandem-mirror configuration can be created by combining hot electron end-cell plasmas with neutral-beam pumping. A region of large negative potential formed in each end cell confines electrons in the central cell. The requirement of charge neutrality causes the central-cell potential to become negative with respect to ground in order to equate ion loss to electron loss. Start-up and formation of the axial potential distribution, neutral-beam pumping, hot electron feed, electron-cyclotron-resonance heating (ECRH) power requirements, and stability are discussed in general terms. Each of these considerations impose constraints on the operation of TMX as a negative machine. The start-up requirements and scenario are also presented. Work on the design and analysis of negative tandems is continuing. The status of work to date is presented here with problem areas for future work identified.

Poulsen, P.; Allen, S.L.; Baldwin, D.E.

1982-04-06T23:59:59.000Z

478

Rock mechanics contributions from defense programs  

SciTech Connect (OSTI)

An attempt is made at illustrating the many contributions to rock mechanics from US defense programs, over the past 30-plus years. Large advances have been achieved in the technology-base area covering instrumentation, material properties, physical modeling, constitutive relations and numerical simulations. In the applications field, much progress has been made in understanding and being able to predict rock mass behavior related to underground explosions, cratering, projectile penetration, and defense nuclear waste storage. All these activities stand on their own merit as benefits to national security. But their impact is even broader, because they have found widespread applications in the non-defense sector; to name a few: the prediction of the response of underground structures to major earthquakes, the physics of the earth`s interior at great depths, instrumentation for monitoring mine blasting, thermo-mechanical instrumentation useful for civilian nuclear waste repositories, dynamic properties of earthquake faults, and transient large-strain numerical modeling of geological processes, such as diapirism. There is not pretense that this summary is exhaustive. It is meant to highlight success stories representative of DOE and DOD geotechnical activities, and to point to remaining challenges.

Heuze, F.E.

1992-02-01T23:59:59.000Z

479

Rock types, pore types, and hydrocarbon exploration  

SciTech Connect (OSTI)

A proposed exploration-oriented method of classifying porosity in sedimentary rocks is based on microscopic examination cores or cuttings. Factors include geometry, size, abundance, and connectivity of the pores. The porosity classification is predictive of key petrophysical characteristics: porosity-permeability relationships, capillary pressures, and (less certainly) relative permeabilities. For instance, intercrystalline macroporosity typically is associated with high permeability for a given porosity, low capillarity, and favorable relative permeabilities. This is found to be true whether this porosity type occurs in a sucrosic dolomite or in a sandstone with pervasive quartz overgrowths. This predictive method was applied in three Rocky Mountain oil plays. Subtle pore throat traps could be recognized in the J sandstone (Cretaceous) in the Denver basin of Colorado by means of porosity permeability plotting. Variations in hydrocarbon productivity from a Teapot Formation (Cretaceous) field in the Powder River basin of Wyoming were related to porosity types and microfacies; the relationships were applied to exploration. Rock and porosity typing in the Red River Formation (Ordovician) reconciled apparent inconsistencies between drill-stem test, log, and mud-log data from a Williston basin wildcat. The well was reevaluated and completed successfully, resulting in a new field discovery. In each of these three examples, petrophysics was fundamental for proper evaluation of wildcat wells and exploration plays.

Coalson, E.B.; Hartmann, D.J.; Thomas, J.B.

1985-05-01T23:59:59.000Z

480

Seepage into drifts in unsaturated fractured rock at Yucca Mountain  

E-Print Network [OSTI]

Fractured Rock at Yucca Mountain Jens Birkholzer, Guomin Lrepository site at Yucca Mountain, Nevada, as it is locatedclimate conditions at Yucca Mountain. The numerical study is

Birkholzer, Jens; Li, Guomin; Tsang, Chin-Fu; Tsang, Yvonne

1998-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "rock grounding upgrades" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Active control of underground stresses through rock pressurization  

SciTech Connect (OSTI)

To significantly increase the stability of underground excavations while exploiting the full advantages of confined rock strength, methods must be developed to actively control the distribution of stresses near the excavation. This US Bureau of Mines study examines theoretical and practical aspects of rock pressurization, an active stress control concept that induces compressive stress in the wall rock through repeated hydraulic fracturing with a settable fluid. Numerical analyses performed by incorporating the rock pressurization concept into a variety of boundary-element models indicate that rock pressurization has the potential to improve underground excavation stability in three ways: (1) by relocating stress concentrations away from the weak opening surface to stronger, confined wall rock; (2) by inducing additional stresses in a biaxial stress field to reduce the difference between the principal stress components near the surface of the opening, and (3) by counteracting the tensile stresses induced in the rock around internally loaded openings. Practical aspects of the rock pressurization concept were investigated through a series of hydraulic fracturing experiments. The use of sulfur as a settable fluid for hydraulic fracturing was demonstrated, although problems related to sulfur viscosity suggest that other molten materials, such as wax, may be better suited to practical field application of the rock pressurization concept.

Vandergrift, T.L.

1995-06-01T23:59:59.000Z

482

Carbonation Mechanism of Reservoir Rock by Supercritical Carbon...  

Broader source: Energy.gov (indexed) [DOE]

the carbonation reaction mechanisms between supercritical carbon dioxide (scCO2) and reservoir rocks consisting of different mineralogical compositions in aqueous and...

483

Scientists Pass Solid Particles Through Rock in DOE-Sponsored...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

rock fractures in the laboratory. This technology has the potential for mapping fracture systems in detail and aid in determining reservoir characteristics. This research was...

484

Reconstruction of Sedimentary Rock Based on Mechanical Properties  

E-Print Network [OSTI]

Diagenesis transforms an unconsolidated loose sed- imentOur emphasis is on unconsolidated sand and sandstone. Thesedi- mentary rock: unconsolidated sand and sandstone. The

Jin, Guodong; Patzek, Tad W.; Silin, Dmitry B.

2008-01-01T23:59:59.000Z

485

Rock Sampling At San Francisco Volcanic Field Area (Warpinski...  

Open Energy Info (EERE)

geologically mapped the target area, obtained rock samples for age dating and mineral chemistry, performed gravity and magnetic surveys, and integrated these results to identify...

486

Evaluation Of Used Fuel Disposition In Clay-Bearing Rock  

Broader source: Energy.gov [DOE]

Radioactive waste disposal in shale/argillite rock formations has been widely considered given its desirable isolation properties, e.g., low permeability, potential geochemically reduced conditions...

487

Atlas SCT/Pixel Grounding and Shielding ATLAS SCT/Pixel Grounding and Shielding Note  

E-Print Network [OSTI]

Atlas SCT/Pixel Grounding and Shielding 1 ATLAS SCT/Pixel Grounding and Shielding Note November 22 mostly connects existing mechanical electrical conductive #12; Atlas SCT/Pixel Grounding and Shielding 2 that equivalent. The barrel outer heat shield (150 aluminum) main element shield. #12; Atlas SCT/Pixel Grounding

California at Santa Cruz, University of

488

Strontium Isotopic Composition of Paleozoic Carbonate Rocks in the Nevada Test Site Vicinity, Clark, Lincoln, and Nye Counties, Nevada and Inyo County, California.  

SciTech Connect (OSTI)

Ground water moving through permeable Paleozoic carbonate rocks represents the most likely pathway for migration of radioactive contaminants from nuclear weapons testing at the Nevada Test Site, Nye County, Nevada. The strontium isotopic composition (87Sr/86Sr) of ground water offers a useful means of testing hydrochemical models of regional flow involving advection and reaction. However, reaction models require knowledge of 87Sr/86Sr data for carbonate rock in the Nevada Test Site vicinity, which is scarce. To fill this data gap, samples of core or cuttings were selected from 22 boreholes at depth intervals from which water samples had been obtained previously around the Nevada Test Site at Yucca Flat, Frenchman Flat, Rainier Mesa, and Mercury Valley. Dilute acid leachates of these samples were analyzed for a suite of major- and trace-element concentrations (MgO, CaO, SiO2, Al2O3, MnO, Rb, Sr, Th, and U) as well as for 87Sr/86Sr. Also presented are unpublished analyses of 114 Paleozoic carbonate samples from outcrops, road cuts, or underground sites in the Funeral Mountains, Bare Mountain, Striped Hills, Specter Range, Spring Mountains, and ranges east of the Nevada Test Site measured in the early 1990's. These data originally were collected to evaluate the potential for economic mineral deposition at the potential high-level radioactive waste repository site at Yucca Mountain and adjacent areas (Peterman and others, 1994). Samples were analyzed for a suite of trace elements (Rb, Sr, Zr, Ba, La, and Ce) in bulk-rock powders, and 87Sr/86Sr in partial digestions of carbonate rock using dilute acid or total digestions of silicate-rich rocks. Pre-Tertiary core samples from two boreholes in the central or western part of the Nevada Test Site also were analyzed. Data are presented in tables and summarized in graphs; however, no attempt is made to interpret results with respect to ground-water flow paths in this report. Present-day 87Sr/86Sr values are compared to values for Paleozoic seawater present at the time of deposition. Many of the samples have 87Sr/86Sr compositions that remain relatively unmodified from expected seawater values. However, rocks underlying the northern Nevada Test Site as well as rocks exposed at Bare Mountain commonly have elevated 87Sr/86Sr values derived from post-depositional addition of radiogenic Sr most likely from fluids circulating through rubidium-rich Paleozoic strata or Precambrian basement rocks.

James B. Paces; Zell E. Peterman; Kiyoto Futa; Thomas A. Oliver; and Brian D. Marshall.

2007-08-07T23:59:59.000Z

489

Building America Perspective and Overlay to the Energy Upgrade California Approach  

Broader source: Energy.gov (indexed) [DOE]

Perspective & Perspective & Overlay to the Energy Upgrade California Approach Driving demand through targeted neighborhood programs By Mark Berman, Alliance for Residential Building Innovation BA Residential Energy Efficiency Stakeholder Meeting - March 1, 2012 Austin, TX Relevant BAP Gaps & Barriers 1. Difficulty in recruiting homeowners to participate in home energy upgrade programs. (Recruitment) 2. Need to develop sustainable retrofit business models (Biz Models) - Review business models in Better Buildings Program & other programs 3. Data mining - need to analyze utility bills to get a sense of whole-house efficiency and savings (Aggregate Results) 2 Overview: Stockton CA