  1. Final Environmental Assessment and Finding of No Significant Impact: Ground Water Compliance at the Slick Rock, Colorado, UMTRA Project Site

    SciTech Connect (OSTI)

    N /A

    2003-03-13

    This environmental assessment addresses the environmental effects of a proposed action and the no action alternative to comply with U.S. Environmental Protection Agency (EPA) ground water standards at the Slick Rock, Colorado, Uranium Mill Tailings Remedial Action Project sites. The sites consist of two areas designated as the North Continent (NC) site and the Union Carbide (UC) site. In 1996, the U.S. Department of Energy (DOE) completed surface cleanup at both sites and encapsulated the tailings in a disposal cell 5 miles east of the original sites. Maximum concentration limits (MCLs) referred to in this environmental assessment are the standards established in Title 40 ''Code of Federal Regulations'' Part 192 (40 CFR 192) unless noted otherwise. Ground water contaminants of potential concern at the NC site are uranium and selenium. Uranium is more prevalent, and concentrations in the majority of alluvial wells at the NC site exceed the MCL of 0.044 milligram per liter (mg/L). Selenium contamination is less prevalent; samples from only one well had concentrations exceeding the MCL of 0.01 mg/L. To achieve compliance with Subpart B of 40 CFR 192 at the NC site, DOE is proposing the strategy of natural flushing in conjunction with institutional controls and continued monitoring. Ground water flow and transport modeling has predicted that concentrations of uranium and selenium in the alluvial aquifer will decrease to levels below their respective MCLs within 50 years.

  2. Ground Water Compliance Action Plan for the Durango, Colorado,UMTRA Project Site

    Office of Legacy Management (LM)

    for the U.S. Department of Energy Approved for public release; distribution is unlimited. Ground Water Compliance Action Plan for the Durango, Colorado, UMTRA Project Site February 2008 This page intentionally left blank U0165200 Ground Water Compliance Action Plan for the Durango, Colorado, UMTRA Project Site February 2008 Prepared by U.S. Department of Energy Grand Junction Office Grand Junction, Colorado Work Performed under DOE Contract No. DE-AC13-02GJ79491 This page intentionally left

  3. Annual report on the U.S. Department of Energy`s cultural resource activities at Colorado UMTRA Project sites for October 1995--September 1996

    SciTech Connect (OSTI)

    1996-09-01

    This report summarizes the results of cultural resource activities conducted by the U.S. Department of Energy (DOE) at Uranium Mill Tailings Remedial Action (UMTRA) Project sites in Colorado for the period of October 1, 1995 through September 30, 1996. The inactive uranium mill tailings sites in Colorado are at Durango, Grand Junction, Gunnison, Maybell, Naturita, Rifle, and Slick Rock. On December 6, 1984, the DOE, the Advisory Council on Historic Preservation, and the Colorado State Historic Preservation Officer (SHPO) entered into a programmatic memorandum of understanding (PMOU). This PMOU requires the DOE to fulfillment of its obligations under various state and federal regulations for the protection and preservation of cultural resources. This report provides the state of Colorado with an annual report on the cultural resource activities performed for all UMTRA Project sites in Colorado. Due to the completion of surface activities at the UMTRA Project sites, this will be the last annual report to the state of Colorado. Cultural resources activities subsequent to this report will be reported to the state through site-specific correspondence.

  4. Environmental Assessment of Ground Water Compliance at the Durango, Colorado, UMTRA Project Site

    SciTech Connect (OSTI)

    N /A

    2002-11-29

    The U.S. Department of Energy (DOE) is proposing a ground water compliance strategy for the Uranium Mill Tailings Remedial Action (UMTRA) Project site near Durango, Colorado. DOE has prepared this environmental assessment to provide the public with information concerning the potential effects of this proposed strategy.

  5. UMTRA project water sampling and analysis plan, Naturita, Colorado. Revision 1

    SciTech Connect (OSTI)

    1995-09-01

    Planned, routine ground water sampling activities for calendar year 1995 to 1997 at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site near Naturita, Colorado, are described in this water sampling and analysis plan. The following plan identifies and justifies the sampling locations, analytical parameters, detection limits, sampling frequency, and specific rationale for each routine monitoring station at the site. The regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from the US Environmental Protection Agency (EPA) regulations in 40 CFR Part 192. Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site.

  6. Site observational work plan for the UMTRA Project Site at Grand Junction, Colorado

    SciTech Connect (OSTI)

    1996-03-01

    The U.S. Department of Energy (DOE) has prepared this initial site observational work plan (SOWP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project site in Grand Junction, Colorado. This SOWP is one of the first UMTRA Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards (40 CFR Part 192, as amended by 60 FR 2854) for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement (PEIS). This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The DOE goal is to use the observational method to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation based on the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards.

  7. UMTRA Project water sampling and analysis plan, Grand Junction, Colorado. Revision 1, Version 6

    SciTech Connect (OSTI)

    1995-09-01

    This water sampling and analysis plan describes the planned, routine ground water sampling activities at the Grand Junction US DOE Uranium Mill Tailings Remedial Action (UMTRA) Project site (GRJ-01) in Grand Junction, Colorado, and at the Cheney Disposal Site (GRJ-03) near Grand Junction. The plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequencies for the routine monitoring stations at the sites. Regulatory basis is in the US EPA regulations in 40 CFR Part 192 (1994) and EPA ground water quality standards of 1995 (60 FR 2854). This plan summarizes results of past water sampling activities, details water sampling activities planned for the next 2 years, and projects sampling activities for the next 5 years.

  8. Environmental Assessment of Ground Water Compliance at the Gunnison, Colorado, UMTRA Project Site

    SciTech Connect (OSTI)

    N /A

    2002-08-13

    The U.S. Department of Energy (DOE) is in the process of selecting a ground water compliance strategy for the Gunnison, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project site. This Environmental Assessment (EA) discusses two alternatives and the effects associated with each. The two alternatives are (1) natural flushing coupled with institutional controls and continued monitoring and (2) no action. The compliance strategy must meet U.S. Environmental Protection Agency (EPA) ground water standards defined in Title 40 ''Code of Federal Regulations'' Part 192, Subpart B, in areas where ground water beneath and around the site is contaminated as a result of past milling operations. It has been determined that contamination in the ground water at the Gunnison site consists of soluble residual radioactive material (RRM) as defined in the Uranium Mill Tailings Radiation Control Act (UMTRCA).

  9. Surface and subsurface cleanup protocol for radionuclides, Gunnison, Colorado, UMTRA project processing site. Final [report

    SciTech Connect (OSTI)

    Not Available

    1993-09-01

    Surface and subsurface soil cleanup protocols for the Gunnison, Colorado, processing sits are summarized as follows: In accordance with EPA-promulgated land cleanup standards (40 CFR 192), in situ Ra-226 is to be cleaned up based on bulk concentrations not exceeding 5 and 15 pCi/g in 15-cm surface and subsurface depth increments, averaged over 100-m{sup 2} grid blocks, where the parent Ra-226 concentrations are greater than, or in secular equilibrium with, the Th-230 parent. A bulk interpretation of these EPA standards has been accepted by the Nuclear Regulatory Commission (NRC), and while the concentration of the finer-sized soil fraction less than a No. 4 mesh sieve contains the higher concentration of radioactivity, the bulk approach in effect integrates the total sample radioactivity over the entire sample mass. In locations where Th-230 has differentially migrated in subsoil relative to Ra-226, a Th-230 cleanup protocol has been developed in accordance with Supplemental Standard provisions of 40 CFR 192 for NRC/Colorado Department of Health (CDH) approval for timely implementation. Detailed elements of the protocol are contained in Appendix A, Generic Protocol from Thorium-230 Cleanup/Verification at UMTRA Project Processing Sites. The cleanup of other radionuclides or nonradiological hazards that pose a significant threat to the public and the environment will be determined and implemented in accordance with pathway analysis to assess impacts and the implications of ALARA specified in 40 CFR 192 relative to supplemental standards.

  10. Colorado

    U.S. Energy Information Administration (EIA) Indexed Site

    Colorado

  11. Final audit report of remedial action construction at the UMTRA Project, Grand Junction, Colorado, processing site

    SciTech Connect (OSTI)

    1995-02-01

    This final audit report (FAR) for remedial action at the Grand Junction, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project processing site consists of a summary of the radiological surveillances/ audits, the quality assurance (QA) in-process surveillances, and the QA final close-out inspection performed by the US Department of Energy (DOE) and Technical Assistance Contractor (TAC). The FAR also summarizes other surveillances performed by the US Nuclear Regulatory Commission (NRC). To summarize, a total of one finding and 127 observations were noted during DOE/TAC audit and surveillance activities. The NRC noted general site-related observations during the OSCRs. Follow-up to responses required from MK-Ferguson for the DOE/TAC finding and observations indicated that all issues related to the Grand Junction processing site were resolved and closed out to the DOE`s satisfaction. The NRC OSCRs resulted in no issues related to the Grand Junction processing site requiring a response from MK-Ferguson.

  12. Laser ablation ICP-mass spectrometry determination of Th{sup 230} in soils at the Gunnison, Colorado UMTRA site

    SciTech Connect (OSTI)

    Anderson, M.S.; Braymen, S.; McIntosh, R.

    1994-02-16

    This report describes an innovative technology, laser ablation-inductively couple plasma-mass spectrometry (LA-ICP-MS), operated in a mobile laboratory, to rapidly detect thorium 230 activity levels in soil samples. This technology was demonstrated on-site during November 1993 at the Gunnison, Colorado, UMTRA project site in support of their remediation effort. The LA-ICP-MS sampling and analysis technique was chosen because of the capability for rapid analysis, approximately three samples per hour, with minimal sample preparation.

  13. Economic impact study of the Uranium Mill Tailings Remedial Action project in Colorado: Colorado state fiscal year 1995

    SciTech Connect (OSTI)

    1995-12-01

    This Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year (FY) 1995 (1 July 1994 through 30 June 1995). To capture employment information, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Gunnison, Maybell, Naturita, Rifle, and Slick Rock, Colorado. Economic data were requested from the Remedial Action Contractor (RAC), the Technical Assistance Contractor (TAC) and the US Department of Energy (DOE). The most significant benefits associated with the UMTRA Project in Colorado are summarized.

  14. Slick Rock, Colorado, Processing Sites and Disposal Sites Fact Sheet

    Office of Legacy Management (LM)

    Slick Rock, Colorado, Processing Sites and Disposal Sites This fact sheet provides information about the Uranium Mill Tailings Radiation Control Act of 1978 Title I processing sites and disposal site at Slick Rock, Colorado. These sites are managed by the U.S. Department of Energy Office of Legacy Management. Locations of the Slick Rock, Colorado, Processing and Disposal Sites Site Descriptions and History The Slick Rock processing sites consist of two former uranium- and vanadium-ore processing

  15. Site observational work plan for the UMTRA project site at Grand Junction, Colorado

    SciTech Connect (OSTI)

    1996-01-01

    This site observational work plan (SOWP) is one of the first Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement. This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The US Department of Energy (DOE) goal is to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation with the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards. The conceptual model demonstrates that the uranium processing-related contamination at the site has affected the unconfined alluvial aquifer, but not the deeper confined aquifer.

  16. Environmental assessment of remedial action at the Slick Rock uranium mill tailings sites, Slick Rock, Colorado

    SciTech Connect (OSTI)

    1995-01-01

    The Uranium Mill Tailings Radiation Control Act of 1978, hereafter referred to as the UMTRCA, authorized the US Department of Energy (DOE) to clean up two uranium mill tailings processing sites near Slick Rock, Colorado, in San Miguel County. The purpose of the cleanup is to reduce the potential health effects associated with the radioactive materials remaining on the processing sites and on vicinity properties (VPs) associated with the sites. The US Environmental Protection Agency (EPA) promulgated standards for the UMTRCA that contained measures to control the contaminated materials and to protect the ground water from further degradation. The sites contain concrete foundations of mill buildings, tailings piles, and areas contaminated by windblown and waterborne radioactive tailings materials. The proposed action is to remediate the UC and NC sites by removing all contaminated materials within the designated site boundaries or otherwise associated with the sites, and relocating them to, and stabilizing them at, a location approximately 5 road mi (8 km) northeast of the processing sites on land administered by the US Bureau of Land Management (BLM). Remediation would be performed by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project.

  17. Environmental assessment of remedial action at the slick rock Uranium Mill Tailings sites Slick Rock, Colorado

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The Uranium Mill Tailings Radiation Control Act of 1978 (42 USC {section} 7901 et seq.), hereafter referred to as the UMTRCA, authorized the U.S. Department of Energy (DOE) to clean up two uranium mill tailings processing sites near Slick Rock, Colorado, in San Miguel County. The purpose of the cleanup is to reduce the potential health effects associated with the radioactive materials remaining on the sites and on vicinity properties (VPs) associated with the sites. Contaminated materials cover an estimated 55 acres of the Union Carbide (UC) processing site and 12 ac of the North Continent (NC) processing site. The total estimated volume of contaminated materials is approximately 61 8,300 cubic yards. In addition to the contamination in the two processing site areas, four VPs were found to contain contamination. As a result of the tailings being exposed to the environment, contamination associated with the UC and NC sites has leached into shallow ground water. Surface water has not been affected. The closest residence is approximately 0.3 air mi from either site. The proposed action is to remediate the UC and NC sites by removing all contaminated materials within the designated site boundaries or otherwise associated with the sites, and relocating them to, and stabilizing them at, a location approximately 5 road mi (8 km) northeast of the sites on land administered by the Bureau of Land Management (BLM). Remediation would be performed by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. All solid contaminated materials would be buried under 5 feet (ft) of rock and soil materials. The proposed disposal site area is currently used by ranchers for cattle grazing over a 7-month period. The closest residence to the proposed disposal site is 2 air mi. An estimated 44 ac of land would be permanently transferred from the BLM to the DOE and restricted from future use.

  18. Economic impact study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado state fiscal year 1994

    SciTech Connect (OSTI)

    Not Available

    1994-11-01

    The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year 1994. To capture employment information, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Naturita, Gunnison, and Rifle, Colorado. Economic data were requested from each site prime subcontractor, as well as from the Remedial Action Contractor. The most significant benefits associated with the UMTRA Project in Colorado are summarized. This study assesses benefits associated with the Grand Junction, Gunnison, Naturita, and Rifle UMTRA Projects sites for the 1-year period under study. Work at the Naturita site was initiated in April 1994 and involved demolition of buildings at the processing site. Actual start-up of remediation of Naturita is planned to begin in the spring of 1995. Work at the Slick Rock and Maybell sites is expected to begin in 1995. The only current economic benefits associated with these sites are related to UMTRA Project support work.

  19. Surface and subsurface cleanup protocol for radionuclides Gunnison, Colorado, UMTRA Project Processing Site. Revision 3, Final report

    SciTech Connect (OSTI)

    Not Available

    1994-05-01

    The supplemental standards provisions of Title 40, Code of Federal Regulations, Part 192 (40 CFR Part 192) require the cleanup of radionuclides other than radium-226 (Ra-226) to levels ``as low as reasonably achievable`` (ALARA), taking into account site-specific conditions, if sufficient quantities and concentrations are present to constitute a significant radiation hazard. In this context, thorium-230 (Th-230) at the Gunnison, Colorado, processing site will require remediation. However, a seasonally fluctuating groundwater table at the site significantly complicates conventional remedial action with respect to cleanup. Characterization data indicate that in the offpile areas, the removal of residual in situ bulk Ra-226 and Th-230 such that the 1000-year projected Ra-226 concentration (Ra-226 concentration in 1000 years due to the decay of in situ Ra-226 and the in-growth of Ra-226 from in situ Th-230) complies with the US Environmental Protection Agency (EPA) cleanup standard for in situ Ra-226 and the cleanup protocol for in situ Th-230 can be readily achieved using conventional excavation techniques for bulk contamination without encountering significant impacts due to groundwater. The EPA cleanup standard and criterion for Ra-226 and the 1000-year projected Ra-226 are 5 and 15 picocuries per gram (pCi/g) above background, respectively, averaged over 15-centimeter (cm) deep surface and subsurface intervals and 100-square-meter (m{sup 2}) grid areas. Significant differential migration of Th-230 relative to Ra-226 has occurred over 40 percent of the subpile area. To effectively remediate the site with respect to Ra-226 and Th-230, supplemental standard is proposed and discussed in this report.

  20. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado. Remedial action selection report, Appendix B

    SciTech Connect (OSTI)

    Not Available

    1993-07-01

    The Slick Rock uranium mill tailings sites are located near the small town of Slick Rock, in San Miguel County, Colorado. There are two designated UMTRA sites at Slick Rock, the Union Carbide (UC) site and the North Continent (NC) site. Both sites are adjacent to the Dolores River. The UC site is approximately 1 mile (mi) [2 kilometers (km)] downstream of the NC site. Contaminated materials cover an estimated 55 acres (ac) [22 hectares (ha)] at the UC site and 12 ac (4.9 ha) at the NC site. The sites contain former mill building concrete foundations, tailings piles, demolition debris, and areas contaminated by windblown and waterborne radioactive materials. The total estimated volume of contaminated materials is approximately 620, 000 cubic yards (yd{sup 3}) [470,000 cubic meters (m{sup 3})]. In addition to the contamination at the two processing site areas, four vicinity properties were contaminated. Contamination associated with the UC and NC sites has leached into groundwater.

  1. UMTRA Ground Water Project

    Office of Legacy Management (LM)

    Verification Monitoring Report for the Gunnison, Colorado, Processing Site September 2013 LMS/GUP/S10620 This page intentionally left blank LMS/GUP/S10620 2013 Verification Monitoring Report for the Gunnison, Colorado, Processing Site September 2013 This page intentionally left blank U.S. Department of Energy 2013 Verification Monitoring Report-Gunnison, Colorado, Processing Site September 2013 Doc. No. S10620 Page i Contents Abbreviations

  2. UMTRA Ground Water Project

    Office of Legacy Management (LM)

    ... DOE Monitoring Wells-Golf Course and Residential, near the Gunnison Site ... Monitoring Report-Gunnison, Colorado, Processing Site U.S. Department of Energy Doc. No. ...

  3. Environmental assessment of remedial action at the Slick Rock uranium mill tailings sites, Slick Rock, Colorado. Revision 1

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The Uranium Mill Tailings Radiation Control Act of 1978 (42 USC {section}7901 et seq.), hereafter referred to as the UMTRCA, authorized the US Department of Energy (DOE) to clean up two uranium mill tailings processing sites near Slick Rock, Colorado, in San Miquel County. Contaminated materials cover an estimated 63 acres of the Union Carbide (UC) processing site and 15 ac of the North Continent (NC) processing site. The sites are within 1 mile of each other and are adjacent to the Dolores River. The sites contain concrete foundations of mill buildings, tailings piles, and areas contaminated by windblown and waterborne radioactive tailings materials. The total estimated volume of contaminated materials is approximately 621,300 cubic yards (yd{sup 3}). In addition to the contamination in the two processing site areas, four VPs were found to contain contamination. As a result of the tailings being exposed to the environment, contamination associated with the UC and NC sites has leached into shallow ground water. Surface water has not been affected. The closest residence is approximately 0.3 air mi from either site. The proposed action is to remediate the UC and NC sites by removing all contaminated materials within the designing site boundaries or otherwise associated with the sites, and relocating them to, and stabilizing them at, a location approximately 5 road mi northeast of the sites on land administered by the Bureau of Land Management (BLM).

  4. CLEANING UP MILL TAILINGS AND GROUND WATER AT THE MOAB UMTRA PROJECT SITE |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy CLEANING UP MILL TAILINGS AND GROUND WATER AT THE MOAB UMTRA PROJECT SITE CLEANING UP MILL TAILINGS AND GROUND WATER AT THE MOAB UMTRA PROJECT SITE August 2, 2010 - 12:00pm Addthis A sheep’s foot roller compacts the tailings in the disposal cell. A sheep's foot roller compacts the tailings in the disposal cell. Moab, UT MILL TAILINGS REMOVAL Sixteen million tons of uranium mill tailings 80 feet high stood on the banks of the Colorado River near Moab in southeast

  5. UMTRA Ground Water Project management action process document

    SciTech Connect (OSTI)

    1996-03-01

    A critical U.S. Department of Energy (DOE) mission is to plan, implement, and complete DOE Environmental Restoration (ER) programs at facilities that were operated by or in support of the former Atomic Energy Commission (AEC). These facilities include the 24 inactive processing sites the Uranium Mill Tailings Radiation Control Act (UMTRCA) (42 USC Section 7901 et seq.) identified as Title I sites, which had operated from the late 1940s through the 1970s. In UMTRCA, Congress acknowledged the potentially harmful health effects associated with uranium mill tailings and directed the DOE to stabilize, dispose of, and control the tailings in a safe and environmentally sound manner. The UMTRA Surface Project deals with buildings, tailings, and contaminated soils at the processing sites and any associated vicinity properties (VP). Surface remediation at the processing sites will be completed in 1997 when the Naturita, Colorado, site is scheduled to be finished. The UMTRA Ground Water Project was authorized in an amendment to the UMTRCA (42 USC Section 7922(a)), when Congress directed DOE to comply with U.S. Environmental Protection Agency (EPA) ground water standards. The UMTRA Ground Water Project addresses any contamination derived from the milling operation that is determined to be present at levels above the EPA standards.

  6. EA-1458: Environmental Assessment

    Office of Energy Efficiency and Renewable Energy (EERE)

    Ground Water Compliance at the Slick Rock, Colorado, UMTRA Project Sites, DOE Grand Junction Office, Grand Junction, Colorado

  7. UMTRA Project document control system manual

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    This manual defines the Project Document Control System (PDCS) operated by the US DOE Uranium Mill tailings Remedial Action (UMTRA) project Office. The purpose of the PDCS is to provide an active and continuing program for acquiring, controlling, retaining, retrieving, retiring and disposing of all UMTRA Project documents. The PDCS also provides guidance and coordination in transferring documents by various UMTRA Projection document control centers to a central location.

  8. U.S. Department of Energy UMTRA Ground Water Project Ground Water Pumping and Monitoring Plan

    Office of Legacy Management (LM)

    GWMON 1.12-1 U.S. Department of Energy UMTRA Ground Water Project Ground Water Pumping and Monitoring Plan for the Land Farm Pilot Test Monument Valley, Arizona August 2000 Prepared by U.S. Department of Energy Grand Junction Ofice Grand Junction, Colorado Project Number UGW-5 1 1-001 5-21-000 Document Number U0106701 This page intentionally left blank Document Number U0106701 Contents Contents 1.0 Introduction

  9. Colorado - Compare - U.S. Energy Information Administration (EIA)

    U.S. Energy Information Administration (EIA) Indexed Site

    Colorado Colorado

  10. Colorado - Rankings - U.S. Energy Information Administration (EIA)

    U.S. Energy Information Administration (EIA) Indexed Site

    Colorado Colorado

  11. Colorado - Search - U.S. Energy Information Administration (EIA)

    U.S. Energy Information Administration (EIA) Indexed Site

    Colorado Colorado

  12. Uranium Mill Tailings Remedial Action (UMTRA) Project. [UMTRA project

    SciTech Connect (OSTI)

    Not Available

    1989-09-01

    The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, hereinafter referred to as the Act.'' Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial action at designated inactive uranium processing sites (Attachment 1 and 2) and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing site. The purpose of the remedial actions is to stabilize and control such uranium mill tailings and other residual radioactive materials in a safe and environmentally sound manner to minimize radiation health hazards to the public. The principal health hazards and environmental concerns are: the inhalation of air particulates contaminated as a result of the emanation of radon from the tailings piles and the subsequent decay of radon daughters; and the contamination of surface and groundwaters with radionuclides or other chemically toxic materials. This UMTRA Project Plan identifies the mission and objectives of the project, outlines the technical and managerial approach for achieving them, and summarizes the performance, cost, and schedule baselines which have been established to guide operational activity. Estimated cost increases by 15 percent, or if the schedule slips by six months. 4 refs.

  13. Remedial Action Plan and Site design for stabilization of the inactive Uranium Mill Tailings sites at Slick Rock, Colorado: Revision 1. Remedial action selection report, Attachment 2, geology report, Attachment 3, ground water hydrology report, Attachment 4, water resources protection strategy. Final

    SciTech Connect (OSTI)

    1995-09-01

    The Slick Rock uranium mill tailings sites are located near the small community of Slick Rock, in San Miguel County, Colorado. There are two designated Uranium Mill Tailings Remedial Action (UMTRA) Project sites at Slick Rock: the Union Carbide site and the North Continent site. Both sites are adjacent to the Dolores River. The sites contain former mill building concrete foundations, tailings piles, demolition debris, and areas contaminated by windblown and waterborne radioactive materials. The total estimated volume of contaminated materials is approximately 621,000 cubic yards (475,000 cubic meters). In addition to the contamination at the two processing site areas, 13 vicinity properties were contaminated. Contamination associated with the UC and NC sites has leached into ground water. Pursuant to the requirements of the Uranium Mill Tailings Radiation Control Act (UMTRCA) (42 USC {section}7901 et seq.), the proposed remedial action plan (RAP) will satisfy the final US Environmental Protection Agency (EPA) standards in 40 CFR Part 192 (60 FR 2854) for cleanup, stabilization, and control of the residual radioactive material (RRM) (tailings and other contaminated materials) at the disposal site at Burro Canyon. The requirements for control of the RRM (Subpart A) will be satisfied by the construction of an engineered disposal cell. The proposed remedial action will consist of relocating the uranium mill tailings, contaminated vicinity property materials, demolition debris, and windblown/weaterborne materials to a permanent repository at the Burro Canyon disposal site. The site is approximately 5 road mi (8 km) northeast of the mill sites on land recently transferred to the DOE by the Bureau of Land Management.

  14. Rocks

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Rocks Rocks Rocks have been used by mankind throughout history. In geology, rock is a naturally occurring composite of one or more minerals or mineraloids. One of our most popular...

  15. Streamlining environmental restoration studies: A modeling (RESRAD) application, Rock Flats Plant, Colorado

    SciTech Connect (OSTI)

    Magee, R.; Johnson, B.; Rampertaap, A.

    1995-12-01

    To enhance the accuracy and ultimate success of an environmental investigation, both efficiency and streamlining are critical. Computer simulation modeling used in the early stages of a project can fortify the streamlining by providing tools for data screening, testing assumptions, and prognosticating conditions. Data from the department of Energy`s Rocky Flats Plant in Golden, Colorado were used in a case study to test the value of early risk-style modeling in scoping an environmental restoration study. The modeling package employed was RESRAD Version 4.1, a microcomputer analytical program developed by the Argonne National Laboratory. The data used to build the model were taken from publicly available records provided by the Rocky Flats Environmental Restoration program. The study demonstrates that computer modeling can be used as a framework - or skeleton - on which to conduct an environmental investigation, and that the visualization of data needs, expected outcomes, and levels of data reliability can be enhanced by such modeling, thus yielding results of greater value. The strength of the modeling approach is that tests for site concepts can be constructed from existing data, although validation could prove necessary in some instances. Significant exposure pathways can be isolated from preexisting information, and predictive exposure results can be used to evaluate the soundness of conceptual assumptions and to preview investigative results that might signal changes in study direction. The single most valuable advantage of employing computer simulation early in an investigation, however, is that it can be effectively resolve the {open_quotes}What if?{close_quotes} scenarios that provide the investigator with an immediate responsive methodology for use in directing studies and supporting procedural decisions.

  16. UMTRA project list of reportable occurrences

    SciTech Connect (OSTI)

    Not Available

    1994-04-01

    This UMTRA Project List of Reportable occurrences is provided to facilitate efficient categorization of reportable occurrences. These guidelines have been established in compliance with DOE minimum reporting requirements under DOE Order 5000.3B. Occurrences are arranged into nine groups relating to US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project operations for active sites. These nine groupings are provided for reference to determined whether an occurrence meets reporting requirement criteria in accordance with the minimum reporting requirements. Event groups and significance categories that cannot or will not occur, and that do not apply to UMTRA Project operations, are omitted. Occurrence categorization shall be as follows: Group 1. Facility Condition; Group 2. Environmental; Group 3. Personnel Safety; Group 4. Personnel Radiation Protection; Group 5. Safeguards and Security; Group 6. Transportation; Group 7. Value Basis Reporting; Group 8. Facility Status; and Group 9. Cross-Category Items.

  17. Uinta Arch Project: investigations of uranium potential in Precambrian X and older metasedimentary rocks in the Unita and Wasatch ranges, Utah and Colorado

    SciTech Connect (OSTI)

    Graff, P.J.; Sears, J.W.; Holden, G.S.

    1980-06-01

    This study is part of the United States Department of Energy's National Uranium Resource Evaluation Program to understand the geologic setting, amount, and availability of uranium resources within the boundaries of the United States. The systematic study of Precambrian quartz-pebble conglomerates and areas that may contain such conglomerates is an integral part of DOE's resource evaluation program, because deposits of world-wide importance occur in such terrains in Canada and South Africa, and because terrains similar to those producing uranium from quartz-pebble conglomerates exist elsewhere in the United States. Because of the ready availability of Tertiary sandstone and Colorado Plateau-type uranium deposits, large areas of Precambrian rocks in the US have not been fully assessed for uranium potential. Thus, the Uinta Arch Project was undertaken to assess the favorability of Precambrian metasedimentary rocks in northern Utah for deposits of uranium in Precambrian quartz-pebble conglomerates. Rocks of interest to this study are the thick, clastic sequences within the Uinta Arch that are considered to be of Early Proterozoic age. The Uinta Arch area is known to contain rocks which generally fit the lithologic characteristics that are understood to limit the occurrence of Precambrian fossil placers. However, detailed geology of these rocks and their exact fit to the model described for uraniferous conglomerates was not known. The primary goal of the Uinta Arch Project was to determine how well these Precambrian rocks resemble known deposits and to describe the favorability of placer uranium deposits.

  18. Economic impact study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado State fiscal year 1994. Revision 1

    SciTech Connect (OSTI)

    Not Available

    1994-12-01

    The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year 1994 (1 July 1993 through 30 June 1994). To capture employment information, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Naturita, Gunnison, and Rifle, Colorado. Economic data were requested from each site prime subcontractor, as well as from the Remedial Action Contractor. Information on wages, taxes, and subcontract expenditures in combination with estimates and economic multipliers is used to estimate the dollar economic benefits to Colorado during the state fiscal year. Finally, the fiscal year 1994 estimates are compared to fiscal year 1993 employment and economic information.

  19. UMTRA Surface Project management action process document: Final. Revision 2

    SciTech Connect (OSTI)

    1996-06-01

    Title 1 of the UMTRCA authorized the DOE to undertake remedial actions at these designed sites and associated vicinity properties (VP), which contain uranium mill tailings and other residual radioactive materials (RRM) derived from the processing sites. Title 2 of the UMTRCA addresses uranium mill sites that were licensed at the time the UMTRCA was enacted. Cleanup of these Title 2 sites is the responsibility of the licensees. The cleanup of the Title 1 sites has been split into two separate projects: the Surface Project, which deals with the mill buildings, tailings, and contaminated soils at the sites and VPs; and the Ground Water Project, which is limited to the contaminated ground water at the sites. This management action process (MAP) document discusses the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project. Since its inception through March 1996, the Surface Project (hereinafter called the Project) has cleaned up 16 of the 24 designated processing sites and approximately 5,000 VPs, reducing the risk to human health and the environment posed by the uranium mill tailings. Two of the 24 sites, Belfield and Bowman, North Dakota, will not be remediated at the request of the state, reducing the total number of sites to 22. By the start of FY1998, the remaining 6 processing sites and associated VPs will be cleaned up. The remedial action activities to be funded in FY1998 by the FY1998 budget request are remediation of the remaining Grand Junction, Colorado, VPs; closure of the Cheney disposal cell in Grand Junction, Colorado; and preparation of the completion reports for 4 completed sites.

  20. Remedial action and site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado. Attachment 2, Geology report: Appendix B, Preliminary final

    SciTech Connect (OSTI)

    Not Available

    1994-03-01

    Detailed investigations of geologic, geomorphic, and seismic conditions at the Burro Canyon site were conducted by the US Department of Energy (DOE) as a disposal site for the tailings at two processing sites near the Slick Rock, Colorado, post office. The purposes of these studies are basic site characterization and identification of potential geologic hazards that could affect long-term site stability. Subsequent engineering studies (e.g., analyses of hydrologic and liquefaction hazards) used the data developed in these studies. The geomorphic analysis was employed in the design of effective erosion protection. Studies of the regional and local seismotectonic setting, which included a detailed search for possible capable faults within a 65-km radius of the site, provided the basis for seismic design parameters.

  1. ERD UMTRA Project quality assurance program plan, Revision 7

    SciTech Connect (OSTI)

    1995-09-01

    This document is the revised Quality Assurance Program Plan (QAPP) dated September, 1995 for the Environmental Restoration Division (ERD) Uranium Mill Tailings Remedial Action Project (UMTRA). Quality Assurance requirements for the ERD UMTRA Project are based on the criteria outlined in DOE Order 5700.6C or applicable sections of 10 CFR 830.120. QA requirements contained in this QAPP shall apply to all personnel, processes, and activities, including planning, scheduling, and cost control, performed by the ERD UMTRA Project and its contractors.

  2. UMTRA Project Office quality assurance program plan. Revision 6

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project was established to accomplish remedial actions at inactive uranium mill tailings sites. The UMTRA Project`s mission is to stabilize and control the residual radioactive materials at designated sites in a safe and environmentally sound manner so as to minimize or eliminate radiation health hazards to the public. Because these efforts may involve possible risks to public health and safety, a quality assurance (QA) program that conforms to the applicable criteria has been established to control the quality of the work. This document, the Quality Assurance Program Plan (QAPP), brings into one document the essential criteria to be applied on a selective basis, depending upon the nature of the activity being conducted, and describes how those criteria shall be applied to the UMTRA Project. QA requirements contained in this QAPP shall apply to all personnel, processes, and activities, including planning, scheduling, and cost control, performed by the UMTRA Project Office and its contractors.

  3. Environmental assessment of remedial action at the Naturita Uranium Processing Site near Naturita, Colorado. Revision 4

    SciTech Connect (OSTI)

    Not Available

    1994-05-01

    The Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law (PL) 95-604, authorized the US Department of Energy (DOE) to perform remedial action at the Naturita, Colorado, uranium processing site to reduce the potential health effects from the radioactive materials at the site and at vicinity properties associated with the site. The US Environmental Protection Agency (EPA) promulgated standards for the UMTRCA that contain measures to control the contaminated materials and to protect groundwater quality. Remedial action at the Naturita site must be performed in accordance with these standards and with the concurrence of the US Nuclear Regulatory Commission (NRC) and the state of Colorado. The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to either the Dry Flats disposal site, 6 road miles (mi) [10 kilometers (km)] to the southeast, or a licensed non-DOE disposal facility capable of handling RRM. At either disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed Dry Flats disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal site would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action would be conducted by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. This report discusses environmental impacts associated with the proposed remedial action.

  4. Weld County, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Colorado Hudson, Colorado Johnstown, Colorado Keenesburg, Colorado Kersey, Colorado La Salle, Colorado Lochbuie, Colorado Longmont, Colorado Mead, Colorado Milliken, Colorado...

  5. UMTRA Project Office Quality Assurance Program Plan. Revision 5

    SciTech Connect (OSTI)

    Not Available

    1993-11-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project was established to accomplish remedial actions at inactive uranium mill tailings sites in accordance with Public Law 95-604, the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRA Project`s mission is to stabilize and control the residual radioactive materials at designated sites in a safe and environmentally sound manner so as to minimize or eliminate radiation health hazards to the public. The US Department of Energy (DOE) UMTRA Project Office directs the overall Project. Because these efforts may involve possible risks to public health and safety, a quality assurance (QA) program that conforms to the applicable criteria (set forth in the reference documents) has been established to control the quality of the work. This document, the Quality Assurance Program Plan (QAPP), brings into one document the essential criteria to be applied on a selective basis, depending upon the nature of the activity being conducted, and describes how those criteria shall be applied to the UMTRA Project. The UMTRA Project Office shall require each Project contractor to prepare and submit for approval a more detailed QAPP that is based on the applicable criteria of this QAPP and the referenced documents. All QAPPs on the UMTRA Project shall fit within the framework of this plan or an industry standard format that has been approved by the DOE Project Office.

  6. EA-1406: Ground Water Compliance at the New Rifle, Colorado, UMTRA Project Site, Rifle, Colorado

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts for the proposed compliance strategy of natural flushing combined with institutional controls and continued monitoring for the New Rifle uranium mill...

  7. Public Involvment Plan - Rifle, Colorado

    Office of Legacy Management (LM)

    ... Atomic Energy Commission (AEC) records from 1947 to 1958 show that 761,000 tons of ore ... that included the upgrading facilities at Slick Rock, Colorado, and Green River, Utah. ...

  8. Economic impact study of the Uranium Mill Tailings Remedial Action project in Colorado: Colorado state fiscal year 1995. Revision 1

    SciTech Connect (OSTI)

    1995-12-01

    As required by the Romer-Twining Agreement of 1990, the US Department of Energy (DOE) has prepared this annual economic impact study for the state of Colorado. This report assesses the economic impacts related to the DOE Uranium Mill Tailings Remedial Action (UMTRA) Project in Colorado during the state fiscal year (FY) between 1 July 1994 and 30 June 1995. To estimate net economic benefit, employment, salaries and wages, and other related economic benefits are discussed, quantified, and then compared to the state`s 10 percent share of the remedial action costs. Actual data obtained from sites currently undergoing remedial action were used as the basis for analyses. If data were not available, estimates were used to derive economic indicators. This study describes the types of employment associated with the UMTRA Project and estimates of the numbers of people employed by UMTRA Project subcontractors in Colorado during state FY 1995. Employment totals are reported in estimated average annual jobs; however, the actual number of workers at the site fluctuates depending on weather and on the status of remedial action activities. In addition, the actual number of people employed on the Project during the year may be higher than the average annual employment reported due to the temporary nature of some of the jobs.

  9. UMTRA project technical assistance contractor quality assurance implementation plan

    SciTech Connect (OSTI)

    Not Available

    1994-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP) (DOE, 1993a), which was developed using US Department of Energy (DOE) Order 5700.6C quality assurance (QA) criteria. The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. All QA issues in the QAIP shall comply with requirements contained in the TAC QAPP (DOE, 1933a). Because industry standards for data acquisition and data control are not addressed in DOE Order 5700.6C, the QAIP has been formatted to the 14 US Environmental Protection Agency (EPA) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) QA requirements. DOE Order 5700.6C criteria that are not contained in the CERCLA requirements are added to the QAIP as additional requirements in Sections 15.0 through 18.0. Project documents that contain CERCLA requirements and 5700.6 criteria shall be referenced in this document to avoid duplication. Referenced documents are not included in this QAIP but are available through the UMTRA Project Document Control Center.

  10. Larimer County, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Colorado Fort Collins, Colorado Johnstown, Colorado Laporte, Colorado Loveland, Colorado Red Feather Lakes, Colorado Timnath, Colorado Wellington, Colorado Windsor, Colorado...

  11. Boulder County, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Colorado Boulder, Colorado Eldora, Colorado Eldorado Springs, Colorado Erie, Colorado Gold Hill, Colorado Gunbarrel, Colorado Jamestown, Colorado Lafayette, Colorado Longmont,...

  12. UMTRA project water sampling and analysis plan, Tuba City, Arizona

    SciTech Connect (OSTI)

    1996-02-01

    Planned, routine ground water sampling activities at the U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Tuba City, Arizona, are described in the following sections of this water sampling and analysis plan (WSAP). This plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the stations routinely monitored at the site. The ground water data are used for site characterization and risk assessment. The regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from the U.S. Environmental Protection Agency (EPA) regulations in 40 CFR Part 192 (1994) and the final EPA standards of 1995 (60 FR 2854). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), and the most effective technical approach for the site.

  13. Colorado Potential Geothermal Pathways

    SciTech Connect (OSTI)

    Zehner, Richard E.

    2012-02-01

    Citation Information: Originator: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Publication Date: 2012 Title: Colorado PRS Cool Fairways Edition: First Publication Information: Publication Place: Earth Science & Observation Center, Cooperative Institute for Research in Environmental Science (CIRES), University of Colorado, Boulder Publisher: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Description: This layer contains the weakened basement rocks. Isostatic gravity was utilized to identify structural basin areas, characterized by gravity low values reflecting weakened basement rocks. Together interpreted regional fault zones and basin outlines define geothermal "exploration fairways", where the potential exists for deep, superheated fluid flow in the absence of Pliocene or younger volcanic units Spatial Domain: Extent: Top: 4544698.569273 m Left: 144918.141004 m Right: 763728.391299 m Bottom: 4094070.397932 m Contact Information: Contact Organization: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Contact Person: Khalid Hussein Address: CIRES, Ekeley Building Earth Science & Observation Center (ESOC) 216 UCB City: Boulder State: CO Postal Code: 80309-0216 Country: USA Contact Telephone: 303-492-6782 Spatial Reference Information: Coordinate System: Universal Transverse Mercator (UTM) WGS’1984 Zone 13N False Easting: 500000.00000000 False Northing: 0.00000000 Central Meridian: -105.00000000 Scale Factor: 0.99960000 Latitude of Origin: 0.00000000 Linear Unit: Meter Datum: World Geodetic System ’1984 (WGS ’1984) Prime Meridian: Greenwich Angular Unit: Degree Digital Form: Format Name: Shape file

  14. EA-1458: Finding of No Significant Impact | Department of Energy

    Office of Environmental Management (EM)

    of Energy (DOE) plans to implement ground water compliance strategies for two Uranium Mill Tailings Remedial Action (UMTRA) Project sites near Slick Rock. Colorado. PDF icon...

  15. UMTRA water sampling and analysis plan, Green River, Utah

    SciTech Connect (OSTI)

    Papusch, R.

    1993-12-01

    The purpose of this water sampling and analysis plan (WSAP) is to provide a basis for groundwater and surface water sampling at the Green River Uranium Mill Tailing Remedial Action (UMTRA) Project site. This WSAP identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the monitoring locations.

  16. Review and analysis of proposed EPA groundwater standards for the UMTRA Project. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect (OSTI)

    Not Available

    1987-10-01

    The Title I groundwater standards for inactive uranium mill tailings sites, which were promulgated on January 5, 1983, by the US Environmental Protection Agency (EPA) for the Uranium Mill Tailings Remedial Action (UMTRA) Project, were remanded to the EPA on September 3, 1985, by the US Tenth Circuit Court of Appeals. The Court instructed the EPA to compile general groundwater standards for all sites. On September 24, 1987, the EPA published proposed standards in response to the remand. This Summary Report includes an evaluation of the potential effects of the proposed EPA groundwater standards on the UMTRA Project as well as a discussion of the DOE's position on the proposed standards. This report is accompanied by a detailed Technical Report and Appendices which provide supporting information and analyses. This Summary Report results from a study undertaken to: determine the impact of the proposed standards on the UMTRA Project; and recommend provisions for the implementation of the final standards that will minimize adverse impact to the conduct of the UMTRA Project while ensuring protection of human health and the environment. Specifically, the following were considered: the flexibility of the proposed standards; interpretations of the proposed standards; the extent of aquifer restoration that may be required to implement the proposed standards at each site; the costs of aquifer restoration; and design changes necessary to meet the standards.

  17. Environmental assessment of remedial action at the Naturita Uranium processing site near Naturita, Colorado. Revision 2

    SciTech Connect (OSTI)

    Not Available

    1994-01-01

    The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to the Dry Flats disposal sits, 6 road miles (mi) [10 kilometers (km)) to the southeast. At the disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal sits would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action activities would be conducted by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. The proposed remedial action would result in the loss of approximately 162 ac (66 ha) of soils at the processing and disposal sites; however, 133 ac (55 ha) of these soils at and adjacent to the processing site are contaminated and cannot be used for other purposes. If supplemental standards are approved by the NRC and state of Colorado, approximately 112 ac (45 ha) of contaminated soils adjacent to the processing site would not be cleaned up. This area is steeply sloped. The cleanup of this contamination would have adverse environmental consequences and would be potentially hazardous to remedial action workers. Another 220 ac (89 ha) of soils would be temporarily disturbed during the remedial action. The final disposal site would result in approximately 57 ac (23 ha) being removed from livestock grazing and wildlife use.

  18. Environmental assessment of remedial action at the Naturita uranium processing site near Naturita, Colorado. Revision 3

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to the Dry Flats disposal site, 6 road miles (mi) [10 kilometers (km)] to the southeast. At the disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal site would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action activities would be conducted by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. The proposed remedial action would result in the loss of approximately 162 ac (66 ha) of soils at the processing and disposal sites; however, 133 ac (55 ha) of these soils at and adjacent to the processing site are contaminated and cannot be used for other purposes. If supplemental standards are approved by the NRC and state of Colorado, approximately 112 ac (45 ha) of contaminated soils adjacent to the processing site would not be cleaned up. This area is steeply sloped. The cleanup of this contamination would have adverse environmental consequences and would be potentially hazardous to remedial action workers. Another 220 ac (89 ha) of soils would be temporarily disturbed during the remedial action. The final disposal site would result in approximately 57 ac (23 ha) being removed from livestock grazing and wildlife use.

  19. UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water, Revision 2

    SciTech Connect (OSTI)

    1995-11-01

    This document contains the Technical Assistance Contractor (TAC) Quality Assurance Implementation Plan (QAIP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project. The QAIP outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QA program is designed to use monitoring, audit, and surveillance activities as management tools to ensure that UMTRA Project activities are carried out in amanner to protect public health and safety, promote the success of the UMTRA Project, and meet or exceed contract requirements.

  20. Geothermal Prospects in Colorado

    Broader source: Energy.gov [DOE]

    Geothermal Prospects in Colorado presentation at the April 2013 peer review meeting held in Denver, Colorado.

  1. UMTRA project disposal cell cover biointrusion sensitivity assessment, Revision 1

    SciTech Connect (OSTI)

    1995-10-01

    This study provides an analysis of potential changes that may take place in a Uranium Mill Tailings Remedial Action (UMTRA) Project disposal cell cover system as a result of plant biointrusion. Potential changes are evaluated by performing a sensitivity analysis of the relative impact of root penetrations on radon flux out of the cell cover and/or water infiltration into the cell cover. Data used in this analysis consist of existing information on vegetation growth on selected cell cover systems and information available from published studies and/or other available project research. Consistent with the scope of this paper, no new site-specific data were collected from UMTRA Project sites. Further, this paper does not focus on the issue of plant transport of radon gas or other contaminants out of the disposal cell cover though it is acknowledged that such transport has the potential to be a significant pathway for contaminants to reach the environment during portions of the design life of a disposal cell where plant growth occurs. Rather, this study was performed to evaluate the effects of physical penetration and soil drying caused by plant roots that have and are expected to continue to grow in UMTRA Project disposal cell covers. An understanding of the biological and related physical processes that take place within the cover systems of the UMTRA Project disposal cells helps the U.S. Department of Energy (DOE) determine if the presence of a plant community on these cells is detrimental, beneficial, or of mixed value in terms of the cover system`s designed function. Results of this investigation provide information relevant to the formulation of a vegetation control policy.

  2. DOE - Office of Legacy Management -- Colorado

    Office of Legacy Management (LM)

    Colorado Colorado 2014co Durango Sites (2) Grand Junction Sites (3) Gunnison Sites (2) Maybell Site Maybell West Site Naturita Sites (2) Rifle Sites (3) Rio Blanco Site Rocky Flats Site Rulison Site Slick Rock Sites (2) Last Updated: 12/15/2015

  3. UMTRA project water sampling and analysis plan, Monument Valley, Arizona

    SciTech Connect (OSTI)

    Not Available

    1994-04-01

    The Monument Valley Uranium Mill Tailings Remedial Action (UMTRA) Project site in Cane Valley is a former uranium mill that has undergone surface remediation in the form of tailings and contaminated materials removal. Contaminated materials from the Monument Valley (Arizona) UMTRA Project site have been transported to the Mexican Hat (Utah) UMTRA Project site for consolidation with the Mexican Hat tailings. Tailings removal was completed in February 1994. Three geologic units at the site contain water: the unconsolidated eolian and alluvial deposits (alluvial aquifer), the Shinarump Conglomerate (Shinarump Member), and the De Chelly Sandstone. Water quality analyses indicate the contaminant plume has migrated north of the site and is mainly in the alluvial aquifer. An upward hydraulic gradient in the De Chelly Sandstone provides some protection to that aquifer. This water sampling and analysis plan recommends sampling domestic wells, monitor wells, and surface water in April and September 1994. The purpose of sampling is to continue periodic monitoring for the surface program, evaluate changes to water quality for site characterization, and provide data for the baseline risk assessment. Samples taken in April will be representative of high ground water levels and samples taken in September will be representative of low ground water levels. Filtered and nonfiltered samples will be analyzed for plume indicator parameters and baseline risk assessment parameters.

  4. Wildlife mitigation and monitoring report Gunnison, Colorado, site

    SciTech Connect (OSTI)

    1997-04-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is administered by the U.S. Department of Energy (DOE); its purpose is to cleanup uranium mill tailings and other contaminated material at 24 UMTRA Project sites in 10 states. This report summarizes the wildlife mitigation and monitoring program under way at the Gunnison UMTRA Project, Gunnison, Colorado. Remedial action at the Gunnison site was completed in December 1995 and is described in detail in the Gunnison completion report. The impacts of this activity were analyzed in the Gunnison environmental assessment (EA). These impacts included two important game species: the pronghorn antelope (Antilocapra americans) and sage grouse (Wentrocerus urophasianus). Haul truck traffic was predicted to limit antelope access to water sources north of the Tenderfoot Mountain haul road and that truck traffic along this and other haul roads could result in antelope road kills. Clearing land at the disposal cell, haul road and borrow site activities, and the associated human activities also were predicted to negatively impact (directly and indirectly) sage grouse breeding, nesting, loafing, and wintering habitat. As a result, an extensive mitigation and monitoring plan began in 1992. Most of the monitoring studies are complete and the results of these studies, written by different authors, appear in numerous reports. This report will: (1) Analyze existing impacts and compare them to predicted impacts. (2) Summarize mitigation measures. (3) Summarize all existing monitoring data in one report. (4) Analyze the effectiveness of the mitigation measures.

  5. UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance Contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP). The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. The QAIP is authorized and approved by the TAC Project Manager and QA manager. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization activities are carried out in a manner that will protect public health and safety, promote the success of the UMTRA Project and meet or exceed contract requirements.

  6. Management and overview Quality Assurance Program Plan. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect (OSTI)

    Not Available

    1986-08-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Office (DOE/ UMTRA-PO) is the US Department of Energy (DOE) Albuquerque Operations Office (AL) organization charged with the responsibility of managing and coordinating the activities of the various participating organizations and support contractors working on the UMTRA Project. This Quality Assurance Program Plan (QAPP) describes how the DOE/UMTRA-PO, as assisted by the Technical Assistance Contractor (TAC), performs the quality assurance (QA) aspects of managing and coordinating UMTRA Project activities. This QAPP was developed to comply with DOE Order 5700.6A, August, 1981, and AL Order 5700.6B, April, 1984, which contain the criteria applicable to Project QA activities.

  7. Remedial action and site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado. Attachment 2, Geology report

    SciTech Connect (OSTI)

    Not Available

    1993-07-01

    This report presents geologic considerations that are pertinent to the Remedial Action Plan for Slick Rock mill tailings. Topics covered include regional geology, site geology, geologic stability, and geologic suitability.

  8. Long-term surveillance plan for the Maybell, Colorado Disposal Site

    SciTech Connect (OSTI)

    1997-12-01

    This long-term surveillance plan (LTSP) describes the U.S. Department of Energy`s (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Maybell disposal site in Moffat County, Colorado. The U.S. Nuclear Regulatory Commission (NRC) has developed regulations for the issuance of a general license for the custody and long-term care of UMTRA Project disposal sites in 10 CFR Part 40. The purpose of this general license is to ensure that the UMTRA Project disposal sites are cared for in a manner that protects the public health and safety and the environment. Before each disposal site is licensed, the NRC requires the DOE to submit a site-specific LTSP. The DOE prepared this LTSP to meet this requirement for the Maybell disposal site. The general license becomes effective when the NRC concurs with the DOE`s determination that remedial action is complete for the Maybell site and the NRC formally accepts this LTSP. This document describes the long-term surveillance program the DOE will implement to ensure the Maybell disposal site performs as designed. The program is based on site inspections to identify threats to disposal cell integrity. The LTSP is based on the UMTRA Project long-term surveillance program guidance document and meets the requirements of 10 CFR {section}40.27(b) and 40 CFR {section}192.03.

  9. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Maybell, Colorado

    SciTech Connect (OSTI)

    1996-03-01

    The U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project (Phase I) and the Ground Water Project (Phase II). Under the UMTRA Surface Project, tailings, contaminated soil, building foundations, and materials associated with the former processing of uranium ore at UMTRA Project sites are placed into disposal cells. The cells are designed to reduce radon and other radiation emissions and to prevent further contamination of ground water. One UMTRA Project site is near Maybell, Colorado. Surface cleanup at this site began in 1995 and is scheduled for completion in 1996. The tailings are being stabilized in place at this site. The disposal area has been withdrawn from public use by the DOE and is referred to as the permanent withdrawal area. The Ground Water Project evaluates the nature and extent of ground water contamination resulting from past uranium ore processing activities. The Ground Water Project at this site is in its beginning stages. This report is a site-specific document that will be used to evaluate current and future potential impacts to the public and the environment from exposure to contaminated ground water. The results presented in this document and other evaluations will determine whether any action is needed to protect human health or the environment.

  10. Long-term surveillance plan for the Maybell, Colorado Disposal Site

    SciTech Connect (OSTI)

    1997-09-01

    This long-term surveillance plan (LTSP) describes the U.S. Department of Energy`s (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Maybell disposal site in Moffat County, Colorado. The U.S. Nuclear Regulatory Commission (NRC) has developed regulations for the issuance of a general license for the custody and long-term care of UMTRA Project disposal sites in 10 CFR Part 40. The purpose of this general license is to ensure that the UMTRA Project disposal sites are cared for in a manner that protects the public health and safety and the environment. Before each disposal site is licensed, the NRC requires the DOE to submit a site-specific LTSP. The DOE prepared this LTSP to meet this requirement for the Maybell disposal site. The general license becomes effective when the NRC concurs with the DOE`s determination that remedial action is complete for the Maybell site and the NRC formally accepts this LTSP. This document describes the long-term surveillance program the DOE will implement to ensure the Maybell disposal site performs as designed. The program is based on site inspections to identify threats to disposal cell integrity. The LTSP is based on the UMTRA Project long-term surveillance program guidance document and meets the requirements of 10 CFR {section}40.27(b) and 40 CFR {section}192.03.

  11. Douglas County, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Estates, Colorado Highlands Ranch, Colorado Larkspur, Colorado Littleton, Colorado Lone Tree, Colorado Louviers, Colorado Meridian, Colorado Parker, Colorado Perry Park, Colorado...

  12. Colorado Energy Office: Colorado Small Hydropower Handbook |...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Colorado Energy Office: Colorado Small Hydropower HandbookPermitting...

  13. DOE - Office of Legacy Management -- Slick Rock Mill Site - CO 08

    Office of Legacy Management (LM)

    Slick Rock Mill Site - CO 08 Site ID (CSD Index Number): CO.08 Site Name: Slick Rock Mill Site Site Summary: Site Link: Slick Rock, Colorado, Processing Site External Site Link: Alternate Name(s): Slick Rock Mill Site Slick Rock (North Continent) Mill 1 Slick Rock (Union Carbide) Mill 2 Uranium Mill No. 1 in Slick Rock (East) Uranium Mill No. 2 in Slick Rock (West) Alternate Name Documents: Location: San Miguel County, Colorado Location Documents: Historical Operations (describe contaminants):

  14. Environmental assessment of remedial action at the Naturita Uranium processing site near Naturita, Colorado. Revision 1

    SciTech Connect (OSTI)

    Not Available

    1993-08-01

    The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to the Dry Flats disposal site, 6 road miles (mi) [ 1 0 kilometers (km)] to the southeast. At the disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal site would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action activities would be conducted by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. The remedial action would result in the loss of approximately 164 ac (66 ha) of soils, but 132 ac (53 ha) of these soils are contaminated and cannot be used for other purposes. Another 154 ac (62 ha) of soils would be temporarily disturbed. Approximately 57 ac (23 ha) of open range land would be permanently removed from livestock grazing and wildlife use. The removal of the contaminated materials would affect the 1 00-year floodplain of the San Miguel River and would result in the loss of riparian habitat along the river. The southwestern willow flycatcher, a Federal candidate species, may be affected by the remedial action, and the use of water from the San Miguel River ``may affect`` the Colorado squawfish, humpback chub, bonytail chub, and razorback sucker. Traffic levels on State Highways 90 and 141 would be increased during the remedial action, as would the noise levels along these transportation routes. Measures for mitigating the adverse environmental impacts of the proposed remedial action are discussed in Section 6.0 of this environmental assessment (EA).

  15. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado: Remedial Action Selection Report. Preliminary final

    SciTech Connect (OSTI)

    Not Available

    1994-03-01

    This proposed remedial action plan incorporates the results of detailed investigation of geologic, geomorphic, and seismic conditions at the proposed disposal site. The proposed remedial action will consist of relocating the uranium mill tailings, contaminated vicinity property materials, demolition debris, and windblown/waterborne materials to a permanent repository at the proposed Burro Canyon disposal cell. The proposed disposal site will be geomorphically stable. Seismic design parameters were developed for the geotechnical analyses of the proposed cell. Cell stability was analyzed to ensure long-term performance of the disposal cell in meeting design standards, including slope stability, settlement, and liquefaction potential. The proposed cell cover and erosion protection features were also analyzed and designed to protect the RRM (residual radioactive materials) against surface water and wind erosion. The location of the proposed cell precludes the need for permanent drainage or interceptor ditches. Rock to be used on the cell top-, side-, and toeslopes was sized to withstand probable maximum precipitation events.

  16. Moab UMTRA Project/LM Technical Exchange | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Office of Legacy Management (LM) technical exchange was hosted at the LM office in Grand Junction, Colorado, on March 2, 2016. The primary goal of the technical exchange was to ...

  17. Green Colorado Credit Reserve

    Broader source: Energy.gov [DOE]

    The Green Colorado Credit Reserve (GCCR) is a loan loss reserve that was created by the Colorado Energy Office (CEO) to incentivize private lenders in Colorado to make small commercial loans up to ...

  18. Colorado: Colorado's Clean Energy Resources and Economy

    SciTech Connect (OSTI)

    2013-03-15

    This document highlights the Office of Energy Efficiency and Renewable Energy's investments and impacts in the state of Colorado.

  19. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Naturita, Colorado

    SciTech Connect (OSTI)

    1995-08-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project (phase I), and the Ground Water Project (phase II). For the UMTRA Project site located near Naturita, Colorado (the Naturita site), phase I involves the removal of radioactively contaminated soils and materials and their transportation to a disposal site at Union Carbide Corporation`s Upper Burbank Repository at Uravan, Colorado, about 13 road miles (mi) (21 kilometers [km]) to the northwest. No uranium mill tailings are involved because the tailings were removed from the Naturita site and placed at Coke Oven, Colorado, during 1977 to 1979. Phase II of the project will evaluate the nature and extent of ground water contamination resulting from uranium processing and its effect on human health or the environment; and will determine site-specific ground water compliance strategies in accordance with the US Environmental Protection Agency (EPA) ground water standards established for the UMTRA Project. Human health risks could occur from drinking water pumped from a hypothetical well drilled in the contaminated ground water area. Environmental risks may result if plants or animals are exposed to contaminated ground water, or surface water that has received contaminated ground water. Therefore, a risk assessment is conducted for the Naturita site. This risk assessment report is the first site-specific document prepared for the Ground Water Project at the Naturita site. What follows is an evaluation of current and possible future impacts to the public and the environment from exposure to contaminated ground water. The results of this evaluation and further site characterization will be used to determine whether any action is needed to protect human health or the environment.

  20. Interim long-term surveillance plan for the Cheney disposal site near, Grand Junction, Colorado

    SciTech Connect (OSTI)

    1997-08-01

    This interim long-term surveillance plan (LTSP) describes the U.S. Department of Energy`s (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Cheney Disposal Site in Mesa County near Grand Junction, Colorado. This LSTP describes the long-term surveillance program the DOE will implement to ensure the Cheney disposal site performs as designed and is cared for in a manner that protects the public health and safety and the environment. Before each disposal site is licensed for custody and long-term care, the Nuclear Regulatory Commission (NRC) requires the DOE to submit such a site-specific LTSP.

  1. Long-term surveillance plan for the Cheney disposal site near Grand Junction, Colorado

    SciTech Connect (OSTI)

    1997-07-01

    This long-term surveillance plan (LTSP) describes the U.S. Department of Energy`s (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Cheney Disposal Site near Grand Junction, Colorado. This LSTP describes the long-term surveillance program the DOE will implement to ensure the Cheney Disposal Site performs as designed and is cared for in a manner that protects the public health and safety and the environment. Before each disposal site is licensed for custody and long-term care, the Nuclear Regulatory Commission (NRC) requires the DOE to submit such a site-specific LTSP.

  2. Colorado School of Mines - Colorado Energy Research Institute...

    Open Energy Info (EERE)

    Mines - Colorado Energy Research Institute Jump to: navigation, search Name: Colorado School of Mines - Colorado Energy Research Institute Address: 1500 Illinois Street Place:...

  3. City of Colorado Springs, Colorado (Utility Company) | Open Energy...

    Open Energy Info (EERE)

    from Colorado Springs Utilities) Jump to: navigation, search Name: Colorado Springs City of Place: Colorado Phone Number: 719-448-4800 Website: www.csu.orgPagesresidential....

  4. Eagle County, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Colorado Edwards, Colorado El Jebel, Colorado Gypsum, Colorado Minturn, Colorado Red Cliff, Colorado Vail, Colorado Retrieved from "http:en.openei.orgw...

  5. Las Animas County, Colorado: Energy Resources | Open Energy Informatio...

    Open Energy Info (EERE)

    in Las Animas County, Colorado Aguilar, Colorado Branson, Colorado Cokedale, Colorado Kim, Colorado Starkville, Colorado Trinidad, Colorado Retrieved from "http:en.openei.org...

  6. Task Order Awarded for Moab Uranium Mill Tailings Remedial Action (UMTRA)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Follow-On Effort | Department of Energy for Moab Uranium Mill Tailings Remedial Action (UMTRA) Follow-On Effort Task Order Awarded for Moab Uranium Mill Tailings Remedial Action (UMTRA) Follow-On Effort April 20, 2016 - 11:30am Addthis Media Contact: Lynette Chafin 513-246-0461 Lynette.Chafin@emcbc.doe.gov Cincinnati - The Department of Energy (DOE) today announced the award of a Fixed Unit Rate and Cost Reimbursement Task Order issued under the Office of Environmental Management Nationwide

  7. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Maybell, Colorado

    SciTech Connect (OSTI)

    1995-09-01

    The US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project (Phase I) and the Ground Water Project (Phase II). Under the UMTRA Surface Project, tailings, radioactive contaminated soil, building foundations, and materials associated with the former processing of uranium ore at UMTRA sites are placed into disposal cells. The cells are designed to reduce radon and other radiation emissions and to prevent further contamination of ground water. One UMTRA Project site is near Maybell, Colorado. Surface cleanup at this site is under way and is scheduled for completion in 1996. The tailings are being stabilized in-place at this site. The disposal area has been withdrawn from public use by the DOE and is referred to as the permanent withdrawal area. The Ground Water Project evaluates the nature and extent of ground water contamination resulting from past uranium ore processing activities. The Ground Water Project at this site is in its beginning stages. This report is a site-specific document that will be used to evaluate current and future potential impacts to the public and the environment from exposure to contaminated ground water. The results of this evaluation and further site characterization will determine whether any action is needed to protect human health or the environment. Currently, no points of exposure (e.g. a drinking water well); and no receptors of contaminated ground water have been identified at the Maybell site. Therefore, there are no current human health and ecological risks associated with exposure to contaminated ground water. Furthermore, if current site conditions and land- and water-use patterns do not change, it is unlikely that contaminated ground water would reach people or the ecological communities in the future.

  8. UMTRA Project Site Observational Work Plan, Mexican Hat, Utah

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    Surface cleanup activities at the Mexican Hat UMTRA processing site are nearing completion. Ground Water contamination at the Mexican Hat site is a result of uranium milling operations. The extent of residual process water has been identified, and it is limited to the uppermost aquifer in the vicinity of the site. Deeper aquifers are not affected because of an upward hydraulic gradient and the presence of a confining unit (the deeper aquifers are protected by hydrogeologic isolation). The uppermost unit is returning to its pre-milling, mainly unsaturated state. The unit that contains the contaminated water is not a ground water resource because it qualifies as Class III (limited use) based on limited yield. Ground water in the uppermost unit is currently not used and is not anticipated to be used as a ground water resource. The nearby San Juan River and a converted oil exploration well provide all of the water needs for the area. There are no current threats to human health or livestock; and, because the zone of contamination does not represent a ground water resource, none are anticipated in the future. There are, however, seeps where contaminated water is exposed at land surface. The seeps create potential exposure pathways for plants and wildlife. It is not known at this time if there is a risk to the environment. Additional investigations are needed and are described in this document to confirm the presence or absence of potential environmental risks. Additional hydrogeologic investigations are not required. The proposed ground water compliance strategy for the site is no remediation, because the ground water in the uppermost aquifer (which is also the zone of contamination) qualifies for supplemental standards based on Class III, limited yield, and because there are no threats to human health. Domestic and agricultural water is pumped from a deeper aquifer that is isolated from the contaminated zone.

  9. Review and analysis of proposed EPA groundwater standards for the UMTRA Project. Summary report

    SciTech Connect (OSTI)

    Not Available

    1987-10-01

    The Title I groundwater standards for inactive uranium mill tailings sites, which were promulgated on January 5, 1983, by the US Environmental Protection Agency (EPA) for the Uranium Mill Tailings Remedial Action (UMTRA) Project, were remanded to the EPA on September 3, 1985, by the US Tenth Circuit Court of Appeals. The Court instructed the EPA to compile general groundwater standards for all sites. On September 24, 1987, the EPA published proposed standards in response to the remand. This Summary Report includes an evaluation of the potential effects of the proposed EPA groundwater standards on the UMTRA Project as well as a discussion of the DOE`s position on the proposed standards. This report is accompanied by a detailed Technical Report and Appendices which provide supporting information and analyses. This Summary Report results from a study undertaken to: determine the impact of the proposed standards on the UMTRA Project; and recommend provisions for the implementation of the final standards that will minimize adverse impact to the conduct of the UMTRA Project while ensuring protection of human health and the environment. Specifically, the following were considered: the flexibility of the proposed standards; interpretations of the proposed standards; the extent of aquifer restoration that may be required to implement the proposed standards at each site; the costs of aquifer restoration; and design changes necessary to meet the standards.

  10. DOE`s approach to groundwater compliance on the UMTRA project

    SciTech Connect (OSTI)

    Metzler, D.; Gibb, J.P.; Glover, W.A.

    1993-03-01

    Compliance with the mandate of the Uranium Mill Tailings Radiation Control Act (UMTRCA) at Uranium Mill Tailings Remedial Action (UMTRA) Project sites requires implementation of a groundwater remedial action plan that meets the requirements of Subpart B of the US Environmental Protection Agency`s proposed groundwater protection standards (40 CFR 192). The UMTRA Groundwater Project will ensure that unacceptable current risk or potential risk to the public health, safety and the environment resulting from the groundwater contamination attributable to the UMTRA sites, is mitigated in a timely and cost-efficient manner. For each UMTRA processing site and vicinity property where contamination exists, a groundwater remedial action plan must be developed that identifies hazardous constituents and establishes acceptable concentration limits for the hazardous constituents as either (a) alternate concentration limits (ACL), (b) maximum concentration limits (MCLs), (c) supplemental standards, or (d) background groundwater quality levels. Project optimization is a strategy that will aggressively work within the current regulatory framework using all available options to meet regulatory requirements. This strategy is outlined within.

  11. Final Environmental Assessment of Ground Water Compliance at...

    Office of Environmental Management (EM)

    458 Environmental Assessment of Ground Water Compliance at the Slick Rock, Colorado, UMTRA ... DE-AC13-02GJ79491 DOE Grand Junction Office EA of Ground Water Compliance at the Slick ...

  12. Saguache County, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Places in Saguache County, Colorado Bonanza, Colorado Center, Colorado Crestone, Colorado Moffat, Colorado Saguache, Colorado Retrieved from "http:en.openei.orgw...

  13. Prowers County, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    County, Colorado Granada, Colorado Hartman, Colorado Holly, Colorado Lamar, Colorado Wiley, Colorado Retrieved from "http:en.openei.orgwindex.php?titleProwersCounty,Color...

  14. Biofuels of Colorado LLC | Open Energy Information

    Open Energy Info (EERE)

    of Colorado LLC Jump to: navigation, search Name: Biofuels of Colorado LLC Place: Denver, Colorado Zip: 80216 Product: Biodiesel producer in Denver, Colorado. References: Biofuels...

  15. University of Colorado | Open Energy Information

    Open Energy Info (EERE)

    Colorado Jump to: navigation, search Name: University of Colorado Place: Boulder, Colorado Zip: 80309 Product: A public university in Colorado. Coordinates: 42.74962,...

  16. Colorado Ground Water Commission | Open Energy Information

    Open Energy Info (EERE)

    Colorado Ground Water Commission Jump to: navigation, search Name: Colorado Ground Water Commission Place: Colorado Website: water.state.co.usgroundwater References: Colorado...

  17. BLM Colorado State Office | Open Energy Information

    Open Energy Info (EERE)

    Colorado State Office Jump to: navigation, search Logo: BLM Colorado State Office Name: BLM Colorado State Office Abbreviation: Colorado Address: 2850 Youngfield Street Place:...

  18. Baseline risk assessment of ground water contamination at the uranium mill tailings sites near Rifle, Colorado. Revision 1

    SciTech Connect (OSTI)

    1995-08-01

    The US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project (Phase 1) and the Ground Water Project (Phase 2). Under the UMTRA Surface Project, tailings, radioactive contaminated soil, equipment, and materials associated with the former uranium ore processing sites are placed into disposal cells. The cells are designed to reduce radon and other radiation emissions and to prevent further ground water contamination. The Ground Water Project evaluates the nature and extent of ground water contamination resulting from the uranium ore processing activities. Two UMTRA Project sites are near Rifle, Colorado: the Old Rifle site and the New Rifle site. Surface cleanup at the two sites is under way and is scheduled for completion in 1996. The Ground Water Project is in its beginning stages. A risk assessment identifies a source of contamination, how that contamination reaches people and the environment, the amount of contamination to which people or the environment may be exposed, and the health or environmental effects that could result from that exposure. This report is a site-specific document that will be used to evaluate current and future impacts to the public and the environment from exposure to contaminated ground water. This evaluation and further site characterization will be used to determine if action is needed to protect human health or the environment.

  19. Site observational work plan for the UMTRA project site at Shiprock, New Mexico

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The site observational work plan (SOWP) for the Shiprock, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is the initial document for developing site-specific activities to achieve regulatory compliance in the UMTRA Ground Water Project. The regulatory framework used to select the proposed ground water compliance strategies is presented along with a discussion of the relationship of this SOWP to other UMTRA Ground Water Project programmatic documents. The Shiprock site consists of two, interconnected hydrogeologic systems: the terrace system and the floodplain system. Separate compliance strategies are proposed for these two systems. The compliance strategy for the terrace aquifer is no remediation with the application of supplemental standards based on classification of the terrace aquifer as having Class III (limited-use) ground water. The compliance strategy for the floodplain aquifer is active remediation using a subsurface biological barrier. These strategies were selected by applying site-specific data to the compliance framework developed in the UMTRA Ground Water programmatic environmental impact statement (PEIS) (DOE, 1994a). The site conceptual model indicates that milling-related contamination has impacted the ground water in the terrace and floodplain aquifers. Ground water occurs in both aquifers in alluvium and in fractures in the underlying Cretaceous age Mancos Shale. A mound of ground water related to fluids from the milling operations is thought to exist in the terrace aquifer below the area where settling ponds were in use during the mill operations. Most of the water occurring in the floodplain aquifer is from recharge from the San Juan River.

  20. Site observational work plan for the UMTRA Project site at Riverton, Wyoming

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The site observational work plan (SOWP) for the Riverton, Wyoming, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is the first document for the UMTRA Ground Water Project to address site-specific activities to meet compliance with the U.S. Environmental Protection Agency (EPA) proposed ground water standards (52 FR 36000 (1987)). In support of the activities the regulatory framework and drivers are presented along with a discussion of the relationship of this SOWP to other UMTRA Ground Water Project programmatic documents. A combination of the two compliance strategies that will be recommended for this site are no remediation with the application of alternate concentration levels (ACL) and natural flushing in conjunction with institutional controls. ACLs are to be applied to constituents that occur at concentrations above background levels but which are essential nutrients and occur within nutritional ranges and/or have very low toxicity and high dietary intake rates compared to the levels detected in the ground water. The essential premise of natural flushing is that ground water movement and natural attenuation processes will reduce the detected contamination to background levels within 1 00 years. These two recommended compliance strategies were evaluated by applying Riverton site-specific data to the compliance framework developed in the UMTRA Ground Water programmatic environmental impact statement. There are three aquifers beneath the site: a surficial unconfined aquifer, a middle semiconfined aquifer, and a deeper confined aquifer. The milling-related contamination at the site has affected both the surficial and semiconfined aquifers, although the leaky shale aquifers separating these units limits the downward migration of contamination into the semiconfined aquifer. A shale aquitard separates the semiconfined aquifer from the underlying confined aquifer which has not been contaminated by milling-related constituents.

  1. Recommendations for computer modeling codes to support the UMTRA groundwater restoration project

    SciTech Connect (OSTI)

    Tucker, M.D.; Khan, M.A.

    1996-04-01

    The Uranium Mill Tailings Remediation Action (UMTRA) Project is responsible for the assessment and remedial action at the 24 former uranium mill tailings sites located in the US. The surface restoration phase, which includes containment and stabilization of the abandoned uranium mill tailings piles, has a specific termination date and is nearing completion. Therefore, attention has now turned to the groundwater restoration phase, which began in 1991. Regulated constituents in groundwater whose concentrations or activities exceed maximum contaminant levels (MCLs) or background levels at one or more sites include, but are not limited to, uranium, selenium, arsenic, molybdenum, nitrate, gross alpha, radium-226 and radium-228. The purpose of this report is to recommend computer codes that can be used to assist the UMTRA groundwater restoration effort. The report includes a survey of applicable codes in each of the following areas: (1) groundwater flow and contaminant transport modeling codes, (2) hydrogeochemical modeling codes, (3) pump and treat optimization codes, and (4) decision support tools. Following the survey of the applicable codes, specific codes that can best meet the needs of the UMTRA groundwater restoration program in each of the four areas are recommended.

  2. Colorado, Processing Sites

    Office of Legacy Management (LM)

    Old and New Rifle, Colorado, Processing Sites September 2014 LMS/RFO-RFN/S11940 This page intentionally left blank LMS/RFO-RFN/S11940 2014 Verification Monitoring Report for the Old and New Rifle, Colorado, Processing Sites September 2014 This page intentionally left blank U.S. Department of Energy 2014 Verification Monitoring Report for the Old and New Rifle, Colorado, Processing Sites September 2014 Doc. No. S11940 Page i Contents Abbreviations

  3. Colorado Springs, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Registered Energy Companies in Colorado Springs, Colorado American Agri diesel LLC American Solar Technology Diamond Wire Technology LLC Larankelo Mobile Energy...

  4. Lower Colorado River Authority | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Lower Colorado River Authority's communications requirements Lower Colorado River Authority (134.07

  5. Implementation plan for the programmatic environmental impact statement for the Department of Energy UMTRA Ground Water Project

    SciTech Connect (OSTI)

    1994-04-01

    Under the Uranium Mill Tailings Remedial Action (UMTRA) Project, the U.S. Department of Energy (DOE) is cleaning up contamination to protect human health and the environment at 24 inactive uranium processing sites located in 10 states. Five of the sites are either on or near Native American lands. The UMTRA Project is divided into two projects: Surface and Ground Water. On November 18, 1992, the DOE issued a notice of intent (57 FR 54374, 1992) to prepare a programmatic environmental impact statement (PEIS) for the UMTRA Ground Water Project. The PEIS will result in a record of decision that will determine how the UMTRA Ground Water Project will address ground water contamination resulting from milling operations at the UMTRA Project processing sites. DOE regulations (10 CFR {section} 1021.312) require that an implementation plan be prepared to provide guidance for preparing a PEIS and to record the results of the scoping process. This implementation plan describes and records the results of the PEIS scoping process; summarizes comments received and their disposition; describes the purpose of and need for agency action, the proposed action, and alternatives; lists alternatives considered and eliminated from review; identifies cooperating agencies, their roles, and responsibilities; provides a draft PEIS outline, which includes the planned PEIS scope and content (Attachment A); and provides a schedule for the PEIS process. This plan will be placed in the UMTRA Project libraries listed in Attachment B. The PEIS will identify and evaluate the potential impacts associated with alternatives for conducting the UMTRA Ground Water Project. The PEIS will not assess site-specific impacts; site-specific impacts must be analyzed in separate National Environmental Policy Act (NEPA) documents that will tier off the PEIS. This tiering process will streamline the preparation of site-specific NEPA documents.

  6. OpenEI Community - Colorado

    Open Energy Info (EERE)

    Colorado Meeting http:en.openei.orgcommunityblogcolorado-meeting

    Yesterday, we held a meeting with Colorado state agencies and geothemral developers to review the...

  7. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Naturita, Colorado. Revision 1

    SciTech Connect (OSTI)

    1995-11-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project, and the Ground Water Project. For the UMTRA Project site located near Naturita, Colorado, phase I involves the removal of radioactively contaminated soils and materials and their transportation to a disposal site at Union Carbide Corporation`s Upper Burbank Repository at Uravan, Colorado. The surface cleanup will reduce radon and other radiation emissions from the former uranium processing site and prevent further site-related contamination of ground water. Phase II of the project will evaluate the nature and extent of ground water contamination resulting from uranium processing and its effect on human health and the environment, and will determine site-specific ground water compliance strategies in accordance with the US Environmental Protection Agency (EPA) ground water standards established for the UMTRA Project. Human health risks could occur from drinking water pumped from a hypothetical well drilled in the contaminated ground water area. Environmental risks may result if plants or animals are exposed to contaminated ground water or surface water that has mixed with contaminated ground water. Therefore, a risk assessment was conducted for the Naturita site. This risk assessment report is the first site-specific document prepared for the Ground Water Project at the Naturita site. What follows is an evaluation of current and possible future impacts to the public and the environment from exposure to contaminated ground water. The results of this evaluation and further site characterization will be used to determine whether any action is needed to protect human health or the environment.

  8. Rio Grande County, Colorado: Energy Resources | Open Energy Informatio...

    Open Energy Info (EERE)

    B. Places in Rio Grande County, Colorado Center, Colorado Del Norte, Colorado Monte Vista, Colorado South Fork, Colorado Retrieved from "http:en.openei.orgw...

  9. Chaffee County, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Colorado BBI International Sun Dog Energy Places in Chaffee County, Colorado Buena Vista, Colorado Poncha Springs, Colorado Salida, Colorado Retrieved from "http:...

  10. Elbert County, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Climate Zone Number 5 Climate Zone Subtype B. Places in Elbert County, Colorado Elizabeth, Colorado Kiowa, Colorado Ponderosa Park, Colorado Simla, Colorado Retrieved from...

  11. Eagle County, Colorado Data Dashboard

    Broader source: Energy.gov [DOE]

    The data dashboard for Eagle County, Colorado, a partner in the Better Buildings Neighborhood Program.

  12. Uranium Mill Tailings Remedial Action Project 1994 environmental report

    SciTech Connect (OSTI)

    1995-08-01

    This annual report documents the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1994, surface remedial action was complete at 14 of the 24 designated UMTRA Project processing sites: Canonsburg, Pennsylvania; Durango, Colorado; Grand Junction, Colorado; Green River Utah, Lakeview, Oregon; Lowman, Idaho; Mexican Hat, Utah; Riverton, Wyoming; Salt Lake City, Utah; Falls City, Texas; Shiprock, New Mexico; Spook, Wyoming, Tuba City, Arizona; and Monument Valley, Arizona. Surface remedial action was ongoing at 5 sites: Ambrosia Lake, New Mexico; Naturita, Colorado; Gunnison, Colorado; and Rifle, Colorado (2 sites). Remedial action has not begun at the 5 remaining UMTRA Project sites that are in the planning stage. Belfield and Bowman, North Dakota; Maybell, Colorado; and Slick Rock, Colorado (2 sites). The ground water compliance phase of the UMTRA Project started in 1991. Because the UMTRA Project sites are.` different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  13. Final audit report of remedial action construction at the UMTRA Project Mexican Hat, Utah -- Monument Valley, Arizona, sites

    SciTech Connect (OSTI)

    1995-10-01

    The final audit report for remedial action at the Mexican Hat, Utah, Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and QA remedial action close-out inspections performed by the US Department of Energy (DOE) and the Technical Assistance Contractor (TAC); on-site construction reviews (OSCR) performed by the US Nuclear Regulatory Commission (NRC); and a surveillance performed by the Navajo Nation. This report refers to remedial action activities performed at the Mexican Hat, Utah--Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites.

  14. Denver, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Organizations in Denver, Colorado Northern Colorado Clean Energy Cluster Wirth Chair in Sustainable Development, University of Colorado Denver Registered Energy Companies in...

  15. Colorado Renewable Energy Society | Open Energy Information

    Open Energy Info (EERE)

    Colorado Renewable Energy Society Name: Colorado Renewable Energy Society Address: PO Box 933 Place: Golden, Colorado Zip: 80402 Region: Rockies Area Website: www.cres-energy.org...

  16. Loveland, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    County, Colorado. It falls under Colorado's 4th congressional district.12 Registered Energy Companies in Loveland, Colorado Abound Solar Bekk Tech BekkTech LLC Hydraulic...

  17. Aspen, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Fork Valley - Energy Efficient Appliance Program (Colorado) Roaring Fork Valley - Energy Smart Colorado Renewable Energy Rebate Program (Colorado) References US Census Bureau...

  18. Alliance for Sustainable Colorado | Open Energy Information

    Open Energy Info (EERE)

    for Sustainable Colorado Jump to: navigation, search Logo: Alliance for Sustainable Colorado Name: Alliance for Sustainable Colorado Address: 1536 Wynkoop Street Place: Denver,...

  19. Denver, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Registered Policy Organizations in Denver, Colorado Northern Colorado Clean Energy Cluster Wirth Chair in Sustainable Development, University of Colorado Denver Registered...

  20. Field Projects: Durango, Colorado

    Broader source: Energy.gov [DOE]

    Personnel from Sandia National Laboratories in New Mexico installed four permeable reactive barriers  PRBs at the Durango, Colorado, Uranium Mill Tailings Radiation Control Act Title I site in...

  1. Colorado Electrical Transmission Grid

    SciTech Connect (OSTI)

    Zehner, Richard E.

    2012-02-01

    Citation Information: Originator: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Originator: Xcel Energy Publication Date: 2012 Title: Colorado XcelEnergy NonXcel Transmission Network Edition: First Publication Information: Publication Place: Earth Science & Observation Center, Cooperative Institute for Research in Environmental Science (CIRES), University of Colorado, Boulder Publisher: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Description: This layer contains transmission network of Colorado Spatial Domain: Extent: Top: 4540689.017558 m Left: 160606.141934 m Right: 758715.946645 m Bottom: 4098910.893397m Contact Information: Contact Organization: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Contact Person: Khalid Hussein Address: CIRES, Ekeley Building Earth Science & Observation Center (ESOC) 216 UCB City: Boulder State: CO Postal Code: 80309-0216 Country: USA Contact Telephone: 303-492-6782 Spatial Reference Information: Coordinate System: Universal Transverse Mercator (UTM) WGS’1984 Zone 13N False Easting: 500000.00000000 False Northing: 0.00000000 Central Meridian: -105.00000000 Scale Factor: 0.99960000 Latitude of Origin: 0.00000000 Linear Unit: Meter Datum: World Geodetic System ’1984 (WGS ’1984) Prime Meridian: Greenwich Angular Unit: Degree Digital Form: Format Name: Shapefile

  2. Colorado Regional Faults

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Hussein, Khalid

    2012-02-01

    Citation Information: Originator: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Originator: Colorado Geological Survey (CGS) Publication Date: 2012 Title: Regional Faults Edition: First Publication Information: Publication Place: Earth Science & Observation Center, Cooperative Institute for Research in Environmental Science, University of Colorado, Boulder Publisher: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Description: This layer contains the regional faults of Colorado Spatial Domain: Extent: Top: 4543192.100000 m Left: 144385.020000 m Right: 754585.020000 m Bottom: 4094592.100000 m Contact Information: Contact Organization: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Contact Person: Khalid Hussein Address: CIRES, Ekeley Building Earth Science & Observation Center (ESOC) 216 UCB City: Boulder State: CO Postal Code: 80309-0216 Country: USA Contact Telephone: 303-492-6782 Spatial Reference Information: Coordinate System: Universal Transverse Mercator (UTM) WGS’1984 Zone 13N False Easting: 500000.00000000 False Northing: 0.00000000 Central Meridian: -105.00000000 Scale Factor: 0.99960000 Latitude of Origin: 0.00000000 Linear Unit: Meter Datum: World Geodetic System 1984 (WGS ’984) Prime Meridian: Greenwich Angular Unit: Degree Digital Form: Format Name: Shape file

  3. Ft. Carson Army Base, Colorado Springs, Colorado | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ft. Carson Army Base, Colorado Springs, Colorado Ft. Carson Army Base, Colorado Springs, Colorado Photo of High-Bay Aviation Maintenance Facility at Butts Army Airfield Fort Carson U.S. Army Base is located south of Colorado Springs, Colorado. It was the first Federal facility to install a "solar wall"-a solar ventilation air preheating system. The solar wall heats Ft. Carson's new high-bay aviation maintenance facility at Butts Army Airfield by pre-warming air as much as 54°F and

  4. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    SciTech Connect (OSTI)

    1995-09-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1995). The DOE`s goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agency (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will assess potential environmental impacts and provide stakeholder a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information available for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology.

  5. UMTRA Surface Project management action process document. Final report: Revision 1

    SciTech Connect (OSTI)

    1996-04-01

    A critical mission of the US Department of Energy (DOE) is the planning, implementation, and completion of environmental restoration (ER) programs at facilities that were operated by or in support of the former Atomic Energy Commission (AEC) from the late 1940s into the 1970s. Among these facilities are the 24 former uranium mill sites designed in the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 (42 USC {section} 7901 et seq.) Title 1 of the UMTRCA authorized the DOE to undertake remedial actions at these designated sites and associated vicinity properties (VP), which contain uranium mill tailings and other residual radioactive materials (RRM) derived from the processing sites. Title 2 of the UMTRCA addresses uranium mill sites that were licensed at the time the UMTRCA was enacted. Cleanup of these Title 2 sites is the responsibility of the licensees. The cleanup of the Title 1 sites has been split into two separate projects: the Surface Project, which deals with the mill buildings, tailings, and contaminated soils at the sites and VPs; and the Ground Water Project, which is limited to the contaminated ground water at the sites. This management action process (MAP) document discusses the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project only; a separate MAP document has been prepared for the UMTRA Ground Water Project.

  6. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    SciTech Connect (OSTI)

    1996-03-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action(UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1996). The DOE`s goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agency (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will be evaluated in the site-specific environmental assessment to determine potential environmental impacts and provide stakeholders a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology.

  7. Lower Colorado River Authority | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    from Lower Colorado River Authority on Smart Grid communications requirements Lower Colorado River Authority (349.31

  8. Colorado: Colorado's Clean Energy Resources and Economy (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2013-03-01

    This document highlights the Office of Energy Efficiency and Renewable Energy's investments and impacts in the state of Colorado.

  9. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Sites near Rifle, Colorado. Revision 2

    SciTech Connect (OSTI)

    1996-02-01

    The U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project (Phase I) and the Ground Water Project (Phase II). Under the UMTRA Surface Project, tailings, radioactive contaminated soil, equipment, and materials associated with the former uranium ore processing sites are placed into disposal cells. The cells are designed to reduce radon and other radiation emissions and to prevent further ground water contamination. The Ground Water Project evaluates the nature and extent of ground water contamination resulting from the uranium ore processing activities. Two UMTRA Project sites are near Rifle, Colorado: the Old Rifle site and the New Rifle site. Surface cleanup at the two sites is under way and is scheduled for completion in 1996. The Ground Water Project is in its beginning stages. A risk assessment identifies a source of contamination, how that contamination reaches people and the environment, the amount of contamination to which people or the environment may be exposed, and the health or environmental effects that could result from that exposure. This report is a site-specific document that will be used to evaluate current and future impacts to the public and the environment from exposure to contaminated ground water. This evaluation and further site characterization will be used to determine if action is needed to protect human health or the environment. Human health risk may result from exposure to ground water contaminated from uranium ore processing. Exposure could occur from drinking water obtained from a well placed in the areas of contamination. Furthermore, environmental risk may result from plant or animal exposure to surface water and sediment that have received contaminated ground water.

  10. Costilla County, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Subtype B. Places in Costilla County, Colorado Blanca, Colorado Fort Garland, Colorado San Luis, Colorado Retrieved from "http:en.openei.orgwindex.php?titleCostillaCounty,...

  11. Colorado/Wind Resources/Full Version | Open Energy Information

    Open Energy Info (EERE)

    Distributed Wind Energy Association Colorado Wind Resources Colorado Energy Office AWEA State Wind Energy Statistics: Colorado Colorado Center for Renewable Energy...

  12. Sedgwick County, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    5 Climate Zone Subtype B. Places in Sedgwick County, Colorado Julesburg, Colorado Ovid, Colorado Sedgwick, Colorado Retrieved from "http:en.openei.orgw...

  13. Ouray County, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Subtype B. Registered Energy Companies in Ouray County, Colorado Alternative Power Enterprises Places in Ouray County, Colorado Loghill Village, Colorado Ouray, Colorado Ridgway,...

  14. Colorado's 3rd congressional district: Energy Resources | Open...

    Open Energy Info (EERE)

    Appliance Program (Colorado) Roaring Fork Valley - Energy Smart Colorado Renewable Energy Rebate Program (Colorado) Utility Companies in Colorado's 3rd congressional district Black...

  15. Design of UMTRA covers to mitigate the effect of frost penetration

    SciTech Connect (OSTI)

    Banani, A.M.; Claire, R.F.

    1994-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project, contracted by the US Department of Energy (DOE), requires construction of disposal cells for residual radioactive materials from abandoned uranium mill tailings. A disposal cell consists of contaminated material placed within a stabilized embankment with a top cover. The embankment and cover should be effective for up to 1000 years, to the extent reasonably achievable, and in any case for at least 200 years. The embankment cover usually consists of a radon/infiltration barrier, a frost barrier and erosion protection layer consisting of bedding and riprap layers. The radon/infiltration barrier and frost barrier are two important elements of the cover systems. A radon/infiltration barrier is designed to reduce the radon emissions from the contaminated materials and to limit the surface water infiltration into the contaminated material. However, a radon/infiltration barrier has to be protected from repeated freeze-thaw cycles to prevent an increase in permeability. Frost penetration depth is site specific and depends on local climatic conditions and soil properties of the cover system. However, placing a frost barrier is not only very costly but also reduces the disposal capacity of the embankment. Recent laboratory test results indicate that freeze-thaw cycles do not significantly effect the permeability of compacted sand-bentonite mixtures. Therefore, radon/infiltration barriers using sand-bentonite mixtures may not require frost barriers for protection against the effects of freeze-thaw. In this paper the design of UMTRA covers is briefly explained; the criteria to determine a 200 year freeze event, and the frost penetration depth are discussed. The results of freeze-thaw permeability tests on compacted clay and sand-bentonite mixtures are also presented.

  16. Geothermal Prospects in Colorado | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Prospects in Colorado Geothermal Prospects in Colorado Geothermal Prospects in Colorado presentation at the April 2013 peer review meeting held in Denver, Colorado. garrett_peer2013.pdf (2 MB) More Documents & Publications Geothermal Prospects in Colorado Stanford Geothermal Workshop 2012 Annual Meeting Fiscal Year 2013 Budget Request Briefing

  17. EA-1987: Parker-Headgate Rock and Parker-Bouse Rebuild Project...

    Broader source: Energy.gov (indexed) [DOE]

    a proposal to rebuild the existing Parker Dam-Headgate Rock and Parker Dam-Bouse 161-kilovolt transmission lines along the Colorado River in western Arizona and eastern California. ...

  18. Colorado Geothermal Commercialization Program

    SciTech Connect (OSTI)

    Healy, F.C.

    1980-04-01

    Chaffee County, located in central Colorado, has immense potential for geothermal development. This report has been prepared to assist residents and developers in and outside the area to develop the hydrothermal resources of the county. Data has been collected and interpreted from numerous sources in order to introduce a general description of the area, estimate energy requirements, describe the resources and postulate a development plan. Electric power generation and direct heat application potential for the region are described.

  19. Work plan for ground water elevation data recorder/monitor well injection at Grand Junction, Colorado

    SciTech Connect (OSTI)

    Not Available

    1994-07-18

    The purpose of this document is to describe the work that will be performed and the procedures that will be followed during installation of ground water monitor wells and ground water elevation data recorders (data loggers) at the Grand Junction, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project site. The monitor wells and data loggers will be used to gather required time-dependent data to investigate the interaction between the shallow aquifer and the Colorado River. Data collection objectives (DCO) identify reasons for collecting data. The following are DCOs for the Grand Junction ground water elevation data recorder/monitor well installation project: long-term continuous ground water level data and periodic ground water samples will be collected to better understand the relationship between surface and ground water at the site; water level and water quality data will eventually be used in future ground water modeling to more firmly establish boundary conditions in the vicinity of the Grand Junction processing site; modeling results will be used to demonstrate and document the potential remedial alternative of natural flushing.

  20. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Grand Junction, Colorado

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    This Baseline Risk Assessment of Ground Water Contamination at the Uranium Mill Tailings Site Near Grand Junction, Colorado evaluates potential impacts to public health or the environment resulting from ground water contamination at the former uranium mill processing site. The tailings and other contaminated material at this site were placed in an off-site disposal cell by the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The remedial activities at the site were conducted from 1989 to 1993. Currently, the UMTRA Project is evaluating ground water contamination. This risk assessment is the first document specific to this site for the Ground Water Project. This risk assessment evaluates the most contaminated ground water that flows beneath the processing site toward the Colorado River. The monitor wells that have consistently shown the highest concentrations of most contaminants are used to assess risk. This risk assessment will be used in conjunction with additional activities and documents to determine what remedial action may be needed for contaminated ground water at the site. This risk assessment follows an approach outlined by the EPA. the first step is to evaluate ground water data collected from monitor wells at the site. Evaluation of these data showed that the contaminants of potential concern in the ground water are arsenic, cadmium, cobalt, fluoride, iron, manganese, molybdenum, nickel, sulfate, uranium, vanadium, zinc, and radium-226. The next step in the risk assessment is to estimate how much of these contaminants people would be exposed to if they drank from a well installed in the contaminated ground water at the former processing site.

  1. Colorado Water Courts | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Colorado Water Courts Abstract This is the website for Colorado Water Courts. Author Colorado...

  2. AMF Deployment, Steamboat Springs, Colorado

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Colorado Steamboat Deployment AMF Home Steamboat Springs Home Storm Peak Lab Data Plots and Baseline Instruments Data Sets Experiment Planning STORMVEX Proposal Abstract and...

  3. Rulison, Colorado, Site Fact Sheet

    Office of Legacy Management (LM)

    4 Fact Sheet This fact sheet provides information about the Rulison, Colorado, Site. This site is managed by the U.S. Department of Energy Office of Legacy Management. Rulison, Colorado, Site Location of the Rulison, Colorado, Site Site Description and History The Rulison site is located 8,154 feet above sea level on the north fank of Battlement Mesa in western Colorado, approximately 12 miles southwest of the town of Rife and 8 miles southeast of the town of Parachute. On September 10, 1969,

  4. Golden, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    in Golden, Colorado Ampulse Ampulse Corporation Blue Sun Biodiesel LLC Colorado Fuel Cell Center CFCC Energistic Systems Energy Solutions Partners, LLC Industrial Solar...

  5. Colorado - Access Permit Application File Review Checklist |...

    Open Energy Info (EERE)

    Jump to: navigation, search OpenEI Reference LibraryAdd to library General: Colorado - Access Permit Application File Review Checklist Author Colorado Department of Transportation...

  6. Colorado/Incentives | Open Energy Information

    Open Energy Info (EERE)

    Yes Building Energy Code (Colorado) Building Energy Code Yes City and County of Denver - Solar Panel Permitting (Colorado) SolarWind Permitting Standards Yes City of Aspen -...

  7. Colorado: Isothermal Battery Calorimeter Quantifies Heat Flow...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Colorado: Isothermal Battery Calorimeter Quantifies Heat Flow, Helps Make Safer, Longer-lasting Batteries Colorado: Isothermal Battery Calorimeter Quantifies Heat Flow, Helps Make ...

  8. Colorado Renewable Resource Cooperative | Open Energy Information

    Open Energy Info (EERE)

    Product: Colorado-based cooperative and forestry producer, that targets the use of woody biomass to generate heat or electricity. References: Colorado Renewable Resource...

  9. Northern Colorado Clean Cities | Open Energy Information

    Open Energy Info (EERE)

    Cities Jump to: navigation, search Name: Northern Colorado Clean Cities Address: PO Box 759 Place: Johnstown, Colorado Zip: 80534 Region: Rockies Area Number of Employees:...

  10. Colorado Meeting | OpenEI Community

    Open Energy Info (EERE)

    Colorado Meeting Home > Blogs > Kyoung's blog Kyoung's picture Submitted by Kyoung(150) Contributor 7 March, 2013 - 10:24 1031 regulations Colorado Yesterday, we held a meeting...

  11. Colorado Water Quality Certification General Information | Open...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Colorado Water Quality Certification General InformationLegal Abstract The Colorado Department of...

  12. Colorado Renewable Energy Collaboratory | Open Energy Information

    Open Energy Info (EERE)

    Collaboratory Jump to: navigation, search Logo: Colorado Renewable Energy Collaboratory Name: Colorado Renewable Energy Collaboratory Address: 410 17th Street, Suite 1400 Place:...

  13. Golden, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Society Registered Energy Companies in Golden, Colorado Ampulse Ampulse Corporation Blue Sun Biodiesel LLC Colorado Fuel Cell Center CFCC Energistic Systems Energy Solutions...

  14. Colorado Construction Dewatering General Permit | Open Energy...

    Open Energy Info (EERE)

    Colorado Construction Dewatering General Permit Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Colorado Construction Dewatering...

  15. Colorado Energy Office | Open Energy Information

    Open Energy Info (EERE)

    Office Jump to: navigation, search Name: Colorado Energy Office Address: 1580 Logan Street, Suite 100 Place: Denver, CO Zip: 80203 Website: www.colorado.govenergy Coordinates:...

  16. Carbondale, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    3rd congressional district.12 Registered Policy Organizations in Carbondale, Colorado Sustainability Center of the Rockies Registered Energy Companies in Carbondale, Colorado...

  17. Niwot, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    place in Boulder County, Colorado.1 Registered Energy Companies in Niwot, Colorado Quantum Energy LLC References US Census Bureau 2005 Place to 2006 CBSA Retrieved from...

  18. Colorado Natural Gas- Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    Colorado Natural Gas offers the Excess is Out Program for residential and commercial customers in Colorado. Incentives are available for purchasing and installing energy efficient furnaces, boilers...

  19. Colorado General Permit for Construction Dewatering Activities...

    Open Energy Info (EERE)

    Frequently Asked Questions. Colorado Department of Public Health and Environment. 4p. GuideHandbook sent to Retrieved from "http:en.openei.orgwindex.php?titleColorado...

  20. Colorado Division of Wildlife | Open Energy Information

    Open Energy Info (EERE)

    Wildlife Jump to: navigation, search Name: Colorado Parks and Wildlife Address: 1313 Sherman Street, Suite 618 Place: Denver, Colorado Zip: 80203 Phone Number: (303) 866-3437...

  1. Colorado STEP Training

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Colorado Natural Gas Gross Withdrawals (Million Cubic Feet) Colorado Natural Gas Gross Withdrawals (Million Cubic Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1991 21,103 24,172 24,435 25,590 23,263 23,548 23,557 24,550 23,440 24,584 25,178 31,698 1992 28,269 26,307 25,490 26,125 27,205 27,139 26,396 27,842 27,128 28,391 29,527 34,175 1993 32,694 29,383 33,718 34,380 36,385 33,931 32,995 34,802 33,910 35,488 36,448 39,870 1994 39,207 35,941 38,103 38,734 41,588 36,686 38,457 39,010

  2. Geology of the lower Yellow Creek Area, Northwestern Colorado

    SciTech Connect (OSTI)

    Hail, W.J.

    1990-01-01

    The lower Yellow Creek area is located in Rio Blanco and Moffat Counties of northwestern Colorado, about midway between the towns of Rangely and Meeker. The study area is in the northwestern part of the Piceance Creek basin, a very deep structural and sedimentary basin that formed during the Laramide orogeny. Potentially important resources in the area are oil shale and related minerals, oil and gas, coal, and uranium. Topics discussed in the report include: Stratigraphy (Subsurface rocks, Cretaceous rocks, Tertiary rocks, and Quaternary deposits); Structure (Midland anticline, graben at Pinyon Ridge, and Crooked Wash syncline, Folds and faults in the vicinity of the White River, Red Wash syncline and central graben zone, Yellow Creek anticlinal nose); Economic geology (Oil shale and associated minerals, Coal, Oil and gas, Uranium, Gravel).

  3. Applications of permeable barrier technology to ground water contamination at the Shiprock, NM, UMTRA site

    SciTech Connect (OSTI)

    Thomson, B.M.; Henry, E.J.; Thombre, M.S.

    1996-12-31

    The Shiprock uranium mill tailings pile in far northwestern New Mexico consists of approximately 1.5 million tons of uranium mill tailings from an acid leach mill which operated from 1954 to 1968. Located on land owned by the Navajo Nation, it was one of the first tailings piles stabilized under the Uranium Mill Tailings Remedial Action (UMTRA) project. Stabilization activities were completed in 1986 and consisted principally of consolidating the tailings, contouring the pile to achieve good drainage, and covering the pile with a multi-layer cap to control infiltration of water, radon emanation, and surface erosion. No ground water protection or remediation measures were implemented other than limiting infiltration of water through the pile, although a significant ground water contamination plume exists in the flood plain adjacent to the San Juan River. The major contaminants at the Shiprock site include high concentrations of sulfate, nitrate, arsenic, and uranium. One alternative for remediation may be the use of a permeable barrier in the flood plain aquifer. As proposed for the Shiprock site, the permeable barrier would be a trench constructed in the flood plain that would be backfilled with a media that is permeable to ground water, but would intercept or degrade the pollutants. Work to date has focused on use of a mixed microbial population of sulfate and nitrate reducing organisms. These organisms would produce strongly reducing conditions which would result in precipitation of the metal contaminants (i.e., Se(IV) and U(IV)) in the barrier. One of the first considerations in designing a permeable barrier is developing an understanding of ground water flow at the site. Accordingly, a steady state numerical model of the ground water flow at the site was developed using the MODFLOW code.

  4. Site observational work plan for the UMTRA Project Site at Tuba City, Arizona

    SciTech Connect (OSTI)

    1994-09-01

    The requirements for ground water compliance for Uranium Mill Tailings Remedial Action (UMTRA) Project sites, including the Tuba City, Arizona, site, are found in the Uranium Mill Tailings Radiation Control Act; Subparts B and C of the U.S. Environmental Protection Agency`s Health and Environmental Protection Standards for Uranium and Thorium Mill Tailings (40 CFR 192 (1994)), and the associated proposed 1987 standards (52 FR 36000). During the surface remedial action, an estimated 1,400,000 cubic yards (yd{sup 3}) (1,100,000 cubic meters [m{sup 3}]) of uranium mill tailings and other contaminated materials were consolidated and stabilized in place in an unlined disposal cell covering 50 acres (20 hectares). The surface remedial action was completed in April 1990. Ground water beneath the Tuba City site was contaminated by subsurface migration of water from uranium ore processing activities. The main source of contaminants was water from the tailings piles that began in 1956 when the mill opened and ended in 1966 when the mill closed. A total of 800,000 tons (725,000 tonnes) of uranium ore were processed onsite over a 10-year period. Two processes were used to refine the ore: an acid leach process and a sodium carbonate alkaline process. Water from these tailings then seeped into the ground and migrated downward to the ground water. The Tuba City site is currently in a post-stabilization, prelicensing status. The preliminary ground water compliance strategy at the Tuba City site is active remediation. The specific technology to be evaluated is in situ bioremediation. This selection was made because of the potential ability of bioremediation to reduce concentrations to lower levels than a conventional extraction system and to minimize disturbance of the water resource.

  5. Site observational work plan for the UMTRA Project site at Tuba City, Arizona

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The requirements for ground water compliance for Uranium Mill Tailings Remedial Action (UMTRA) Project sites, including the Tuba City, Arizona, site, are found in the Uranium Mill Tailings Radiation Control Act; Subparts B and C of the U.S. Environmental Protection Agency`s Health and Environmental Protection Standards for Uranium and Thorium Mill Tailings (40 CFR 192 (1994)), and the associated proposed 1987 standards (52 FR 36000). During the surface remedial action, an estimated 1,400,000 cubic yards (yd{sup 3}) (1,100,000 cubic meters [m{sup 3}]) of uranium mill tailings and other contaminated materials were consolidated and stabilized in place in an unlined disposal cell covering 50 acres (20 hectares). The surface remedial action was completed in April 1990. Ground water beneath the Tuba City site was contaminated by subsurface migration of water from uranium ore processing activities. The main source of contaminants was water from the tailings piles that began in 1956 when the mill opened and ended in 1966 when the mill closed. 800,000 tons (725,000 tonnes) of uranium ore were processed onsite over a 10-year period. The wet tailings remaining after processing were placed as a slurry in three piles at the site. Water from these tailings then seeped into the ground and migrated downward to the ground water. The Tuba City site is currently in a post-stabilization, prelicensing status. The site is expected to remain in this status until licensed by the U.S. Nuclear Regulatory Commission (NRC) for long-term surveillance and maintenance. The preliminary ground water compliance strategy at the Tuba City site is active remediation-specific technology to be evaluated is in situ bioremediation. This selection was made because of the potential ability of bioremediation to reduce concentrations to lower levels than a conventional extraction system and to minimize disturbance of the water resource.

  6. Town of Estes Park, Colorado (Utility Company) | Open Energy...

    Open Energy Info (EERE)

    Estes Park, Colorado (Utility Company) Jump to: navigation, search Name: Town of Estes Park Place: Colorado Phone Number: 970-586-5331 Website: www.colorado.govpacifictowno...

  7. Adams County, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Colorado Access Venture Partners Energy Generation Facilities in Adams County, Colorado Metro Wastewater Reclamation District Biomass Facility Places in Adams County, Colorado...

  8. Colorado Governor s Energy Office | Open Energy Information

    Open Energy Info (EERE)

    Governor s Energy Office Jump to: navigation, search Name: Colorado Governor's Energy Office Place: Denver, Colorado Zip: 80203 Product: Governor's Energy Office of Colorado...

  9. Colorado Fuel Cell Center CFCC | Open Energy Information

    Open Energy Info (EERE)

    Center CFCC Jump to: navigation, search Name: Colorado Fuel Cell Center (CFCC) Place: Golden, Colorado Zip: 80401 Product: A center planned to meet State of Colorado targets for...

  10. Fort Collins, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Program (Colorado) Fort Collins Utilities - Residential and Small Commercial Appliance Rebate Program (Colorado) Utility Companies in Fort Collins, Colorado City of Fort...

  11. Colorado's 4th congressional district: Energy Resources | Open...

    Open Energy Info (EERE)

    Program (Colorado) Fort Collins Utilities - Residential and Small Commercial Appliance Rebate Program (Colorado) Utility Companies in Colorado's 4th congressional district City...

  12. Colorado Regions | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    state, county, city, or district. For more information, please visit the Middle School Coach page. Colorado Region Middle School Regional Colorado Colorado Regional Middle School...

  13. Colorado Region | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    designated for your school's state, county, city, or district. For more information, please visit the High School Coach page. Colorado Region High School Regional Colorado Colorado...

  14. Denver County, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Policy Organizations in Denver County, Colorado Northern Colorado Clean Energy Cluster Wirth Chair in Sustainable Development, University of Colorado Denver Registered...

  15. Solar Home in Boulder, Colorado

    Office of Energy Efficiency and Renewable Energy (EERE)

    This photograph features a 2.04-kilowatt grid-tied solar photovoltaic (PV) electric system on the Edwards home in Colorado that generates clean, carbon-free electricity. Generous utility and...

  16. Smart Grid Pilot Program- Colorado

    Broader source: Energy.gov [DOE]

    This b-roll shows a pilot program to modernize the electrical distribution system in Fort Collins, Colorado, where a smart grid connects industrial and commercial buildings employing renewable...

  17. Code of Colorado Regulations 5 CCR 1002-61, Colorado Discharge...

    Open Energy Info (EERE)

    Code of Colorado Regulations 5 CCR 1002-61, Colorado Discharge Permit System Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document-...

  18. RAPID/Overview/Geothermal/Exploration/Colorado | Open Energy...

    Open Energy Info (EERE)

    Colorado < RAPID | Overview | Geothermal | Exploration(Redirected from RAPIDAtlasGeothermalExplorationColorado) Redirect page Jump to: navigation, search REDIRECT...

  19. R & D Supercritiacl CO2/ Rock Chemicals Interactions | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    R & D Supercritiacl CO2/ Rock Chemicals Interactions R & D Supercritiacl CO2/ Rock Chemicals Interactions R & D Supercritiacl CO2/ Rock Chemicals Interactions presentation at the April 2013 peer review meeting held in Denver, Colorado. university_of_minnesota_peer2013.pdf (2.22 MB) More Documents & Publications An integrated experimental and numerical study: Developing a reaction transport model that couples chemical reactions of mineral dissolution/precipitation with spatial and

  20. Colorado Solar Inc | Open Energy Information

    Open Energy Info (EERE)

    ","group":"","inlineLabel":"","visitedicon":"" Hide Map References: Colorado Solar Inc Web Site1 This article is a stub. You can help OpenEI by expanding it. Colorado Solar...

  1. Pueblo, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Hide Map This article is a stub. You can help OpenEI by expanding it. Pueblo is a city in Pueblo County, Colorado. It falls under Colorado's 3rd congressional...

  2. Colorado State University | Open Energy Information

    Open Energy Info (EERE)

    University Jump to: navigation, search Name: Colorado State University Place: Colorado Phone Number: (970) 491-1101 or 907-491-6444 Website: www.colostate.edu Outage Hotline:...

  3. Colorado Nonpoint Source Website | Open Energy Information

    Open Energy Info (EERE)

    Source Website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Colorado Nonpoint Source Website Abstract This is the website of the Colorado...

  4. Aurora, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Hide Map This article is a stub. You can help OpenEI by expanding it. Aurora is a city in Adams County and Arapahoe County and Douglas County, Colorado. It falls under Colorado's...

  5. Geothermal resources of Colorado | Open Energy Information

    Open Energy Info (EERE)

    OpenEI Reference LibraryAdd to library Report: Geothermal resources of Colorado Author R.H. Pearl Published Colorado Geological Survey Special Publication, 1972 DOI Not Provided...

  6. Westminster, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    This article is a stub. You can help OpenEI by expanding it. Westminster is a city in Adams County and Jefferson County, Colorado. It falls under Colorado's 2nd congressional...

  7. Thornton, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Map This article is a stub. You can help OpenEI by expanding it. Thornton is a city in Adams County and Weld County, Colorado. It falls under Colorado's 2nd congressional district...

  8. Arvada, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Map This article is a stub. You can help OpenEI by expanding it. Arvada is a city in Adams County and Jefferson County, Colorado. It falls under Colorado's 7th congressional...

  9. Aurora, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Map This article is a stub. You can help OpenEI by expanding it. Aurora is a city in Adams County and Arapahoe County and Douglas County, Colorado. It falls under Colorado's 7th...

  10. Brighton, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Map This article is a stub. You can help OpenEI by expanding it. Brighton is a city in Adams County and Weld County, Colorado. It falls under Colorado's 7th congressional district...

  11. Colorado DWR GWS-31 | Open Energy Information

    Open Energy Info (EERE)

    1 Jump to: navigation, search OpenEI Reference LibraryAdd to library Reference: Colorado DWR GWS-31 Published Colorado Division of Water Resources, Date Not Provided DOI Not...

  12. Grand Junction, Colorado, Site Fact Sheet

    Office of Legacy Management (LM)

    D D&D Page 1 of 3 Fact Sheet Grand Junction, Colorado, Site This fact sheet provides information about the Grand Junction, Colorado, Site. This site is managed by the U.S. ...

  13. Avon, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Hide Map This article is a stub. You can help OpenEI by expanding it. Avon is a town in Eagle County, Colorado. It falls under Colorado's 2nd congressional...

  14. Denver, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Colorado Renewable Energy Collaboratory Denver University - International Institute for Environment and Enterprise Institute for Environmental Solutions Secure Smart Grid...

  15. Programmatic Agreement for Colorado | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Programmatic Agreement for Colorado Programmatic Agreement for Colorado U.S. Department of Energy (DOE), Energy Efficiency and Conservation Block Grant Program (EECBG), Weatherization Assistance Program (WAP), State Energy Plan (SEP), Colorado State Historic Preservation Office (SHPO), Colorado Governors Energy Office (GEO), historic preservation, Section 106 of the National Historic Preservation Act, National Register of Historic Places, National Historic Preservation Act (NHPA), Programmatic

  16. Geology of uranium deposits in the southern part of the Rocky Mountain province of Colorado

    SciTech Connect (OSTI)

    Malan, R.C.

    1983-07-01

    This report summarizes the geology of uranium deposits in the southern part of the Rocky Mountains of Colorado, an area of about 20,000 square miles. In January 1966, combined ore reserves and ore production at 28 uranium deposits were about 685,000 tons of ore averaging 0.24 percent U/sub 3/O/sub 8/ (3.32 million pounds U/sub 3/O/sub 8/). About half of these deposits each contain <1,000 tons of ore. The two largest deposits, the Pitch in the Marshall Pass locality southwest of Salida and the T-1 in the Cochetopa locality southeast of Gunnison, account for about 90 percent of all production and available reserves. The probability in excellent for major expansion of reserves in Marshall Pass and is favorable at a few other vein localities. There are six types of uranium deposits, and there were at least four ages of emplacement of these deposits in the southern part of the Colorado Rockies. There are eight types of host rocks of eight different ages. Veins and stratiform deposits each account for about 40 percent of the total number of deposits, but the veins of early and middle Tertiary age account for nearly all of the total reserves plus production. The remaining 20 percent of the deposits include uraniferous pegmatites, irregular disseminations in porphyry, and other less important types. The wall rocks at the large Tertiary vein deposits in the southern part of the Rocky Mountains of Colorado are Paleozoic and Mesozoic sedimentary rocks, whereas Precambrian metamorphic wall rocks predominate at the large veins in the Front Range of the northern Colorado Rockies. Metallogenetic considerations and tectonic influences affecting the distribution of uranium in Colorado and in adjacent portions of the western United States are analyzed.

  17. Colorado State University Technology Marketing Summaries - Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Innovation Portal Colorado State University Technology Marketing Summaries Here you'll find marketing summaries for technologies available for licensing from the Colorado State University (CSU). The summaries provide descriptions of the technologies including their benefits, applications and industries, and development stage. Colorado State University 16 Technology Marketing Summaries Category Title and Abstract Laboratories Date Advanced Materials Biomass and Biofuels Industrial

  18. Colorado - C.R.S. 24-38.5-108, Colorado Energy Office-State Agency...

    Open Energy Info (EERE)

    Colorado - C.R.S. 24-38.5-108, Colorado Energy Office-State Agency Coordination of Review of Federal License and Exemption Applications for Hydroelectric Energy Projects Jump to:...

  19. Recovery Act State Memos Colorado

    Broader source: Energy.gov (indexed) [DOE]

    Colorado For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  20. Colorado Scientists Win National Award

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Scientists Win National Award For more information contact: e:mail: Public Affairs Golden, Colo., July 14, 1999 — Two Colorado scientists will share a major national award for their part in developing a process that can help turn common waste from city landfills and the paper mill industry into environmentally friendly products, such as biodegradable pesticides and gasoline additives. Dr. Joseph Bozell and Dr. Luc Moens at the U.S. Department of Energy's (DOE) National Renewable Energy

  1. Categorical Exclusion Determinations: Colorado | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Colorado Categorical Exclusion Determinations: Colorado Location Categorical Exclusion Determinations issued for actions in Colorado. DOCUMENTS AVAILABLE FOR DOWNLOAD July 5, 2016 CX-100650 Categorical Exclusion Determination Device Architecture for Next-Generation CdTe PV Award Number: DE-EE0007543 CX(s) Applied: A9, B3.6 Solar Energy Technology Office Date: 6/21/2016 Location(s): CO Office(s): Golden Field Office June 13, 2016 CX-100643 Categorical Exclusion Determination NWTC Diesel Storage

  2. Garfield County, Colorado | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Garfield County, Colorado Garfield County, Colorado Garfield Clean Energy Location: Garfield County, Colorado Seed Funding: $545,000 - a portion of Boulder County's $25 million funding Target Building Types: Residential and commercial Website: www.garfieldcleanenergy.org Learn more: Explore the Energy Navigator Facebook: Garfield Clean Energy Read Garfield New Energy Communities Initiative: Results Based on DOLA Contract Exhibit A Read program newsletter Review case studies See program publicity

  3. Colorado Industrial Energy Challenge | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    State and Utility Engagement Activities » Colorado Industrial Energy Challenge Colorado Industrial Energy Challenge Colorado The U.S. Department of Energy's (DOE's) Advanced Manufacturing Office (AMO; formerly the Industrial Technologies Program) has developed multiple resources and a Best Practices suite of tools to help industrial manufacturers reduce their energy intensity. AMO adopted the Energy Policy Act of 2005 objective of reducing industrial energy intensity 2.5% annually over the next

  4. Colorado E85 Dispensing Waiver Letter

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Date: December 27, 2006 FROM: Colorado Division of Oil and Public Safety Colorado Division of Fire Safety Fire Marshals' Association of Colorado Governor's Office of Energy Management and Conservation TO: All Interested Parties RE: E-85 Dispensers On October 5, 2006, Underwriters Laboratories (UL) suspended authorization for manufacturers to use UL Markings (listing or recognition) on components for fuel dispensing devices that specifically reference compatibility with alcohol blended fuels that

  5. RAPID/Geothermal/Transmission Siting & Interconnection/Colorado...

    Open Energy Info (EERE)

    Colorado CRS 29-20-108, Location, Construction, or Improvement of Major Electrical or Natural Gas Facilities Colorado Department of Local Affairs Colorado - C.R.S. 40-1-103 -...

  6. Energy-water challenge emerges in Colorado River flows

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy-water challenge emerges in Colorado River flows Energy-water challenge emerges in Colorado River flows Climate-driven heat-stress and forest mortality on the Colorado River ...

  7. Evans, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Evans, Colorado: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 40.3763701, -104.6921874 Show Map Loading map... "minzoom":false,"mappingservi...

  8. Colorado Public Utilities Commission | Open Energy Information

    Open Energy Info (EERE)

    CBONDORA1251633139779 Retrieved from "http:en.openei.orgwindex.php?titleColoradoPublicUtilitiesCommission&oldid886925" Feedback Contact needs updating Image needs...

  9. Cleantech Solutions (Colorado) | Open Energy Information

    Open Energy Info (EERE)

    Place: Boulder, Colorado Zip: 80301 Region: Rockies Area Sector: Efficiency Product: Energy efficiency solutions and consumption monitoring systems for buildings Website:...

  10. ,"Colorado Natural Gas Gross Withdrawals and Production"

    U.S. Energy Information Administration (EIA) Indexed Site

    Name","Description"," Of Series","Frequency","Latest Data for" ,"Data 1","Colorado Natural Gas Gross Withdrawals and Production",10,"Annual",2014,"06301967" ,"Release...

  11. Colorado Dairy Industry Boosts Energy Efficiency | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Through the Colorado Dairy and Irrigation Efficiency Pilot, eight dairies received a free energy audit and energy-saving recommendations. If the farms followed the recommendations, ...

  12. REC Solar (Colorado) | Open Energy Information

    Open Energy Info (EERE)

    Court Place: Westminster, Colorado Zip: 80030 Region: Rockies Area Sector: Solar Product: Solar panel installer Website: recsolar.com Coordinates: 39.860526, -105.066446 Show...

  13. Protonex Technology Corporation (Colorado) | Open Energy Information

    Open Energy Info (EERE)

    510 Compton Street Place: Broomfield, Colorado Zip: 80020 Region: Rockies Area Sector: Hydrogen Product: Portable fuel cells Website: www.protonex.com Coordinates: 39.924172,...

  14. Colorado State University Hydrodynamics | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search Hydro | Hydrodynamic Testing Facilities Name Colorado State University Address Daryl B. Simons Building, Engineering Research Center, 1320 Campus...

  15. Pierce, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Pierce, Colorado: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 40.635536, -104.7552458 Show Map Loading map... "minzoom":false,"mappingservi...

  16. Boulder, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    (E2) Hogan & Hartson Registered Energy Companies in Boulder, Colorado A2BE Carbon Capture LLC Albeo Technologies Also Energy American Environmental Products American Solar...

  17. Wellington, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Wellington, Colorado: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 40.7038712, -105.0085856 Show Map Loading map... "minzoom":false,"mapping...

  18. Colorado Industrial Challenge and Recognition Program

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy Industrial Technologies Program 2009 State Award Fact Sheet that offers details of the Colorado Industrial program.

  19. ,"Colorado Natural Gas LNG Storage Withdrawals (MMcf)"

    U.S. Energy Information Administration (EIA) Indexed Site

    Of Series","Frequency","Latest Data for" ,"Data 1","Colorado Natural Gas LNG Storage Withdrawals (MMcf)",1,"Annual",2014 ,"Release Date:","9302015" ,"Next Release...

  20. Wiley, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Wiley, Colorado: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 38.1541748, -102.7196403 Show Map Loading map... "minzoom":false,"mappingservi...

  1. Colorado/Wind Resources | Open Energy Information

    Open Energy Info (EERE)

    Guidebook >> Colorado Wind Resources WindTurbine-icon.png Small Wind Guidebook * Introduction * First, How Can I Make My Home More Energy Efficient? * Is Wind Energy Practical...

  2. Ridgway, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    district.12 Registered Energy Companies in Ridgway, Colorado Alternative Power Enterprises References US Census Bureau Incorporated place and minor civil division...

  3. Ward, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Ward, Colorado: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 40.0722083, -105.5083316 Show Map Loading map... "minzoom":false,"mappingservic...

  4. Columbine, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Columbine, Colorado: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 39.5877657, -105.0694295 Show Map Loading map... "minzoom":false,"mappings...

  5. ,"Colorado Natural Gas Gross Withdrawals and Production"

    U.S. Energy Information Administration (EIA) Indexed Site

    ...ame","Description"," Of Series","Frequency","Latest Data for" ,"Data 1","Colorado Natural Gas Gross Withdrawals and Production",10,"Monthly","42016","01151989" ,"Release ...

  6. Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Colorado: Energy Resources Jump to: navigation, search Loading map... "minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":6,"types":"ROADMAP","SATELLITE","HYBR...

  7. Centennial, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Colorado Ciris Energy Inhibiton Therapeutics Inc ProtoFlex Corp formerly Alpha Optics Inc Tru-Lite References US Census Bureau Incorporated place and minor civil...

  8. WIPP Mine Rescue Team Wins Colorado Competition

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Colorado Competition CARLSBAD, N.M., July 11, 2001 - The Silver Mine Rescue Team from the U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) placed first in the recent Western Regional Mine Rescue Competition. It was the first victory by a WIPP team in this competition in five years. The Colorado State Mine Inspector's Office, in conjunction with the Colorado School of Mines, hosted the Western Regional, June 12-14 in Golden, Colorado. The WIPP Silver Team defeated seven teams,

  9. Colorado's Hydrothermal Resource Base - An Assessment | Open...

    Open Energy Info (EERE)

    Hydrothermal Resource Base - An Assessment Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Colorado's Hydrothermal Resource Base - An Assessment Author...

  10. Serious Materials (Colorado) | Open Energy Information

    Open Energy Info (EERE)

    to: navigation, search Logo: Serious Materials Name: Serious Materials Address: 5400 Spine Road Place: Boulder, Colorado Zip: 80301 Region: Rockies Area Sector: Carbon Product:...

  11. Mead, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Mead, Colorado: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 40.2333174, -104.9985899 Show Map Loading map... "minzoom":false,"mappingservic...

  12. Lower Colorado River Authority | Open Energy Information

    Open Energy Info (EERE)

    Name: Lower Colorado River Authority Place: Texas Website: www.lcra.orgPagesdefault.asp Twitter: @lcra Facebook: https:www.facebook.comlowercoloradoriverauthority Outage...

  13. COLORADO RECOVERY ACT SNAPSHOT | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    The American Recovery & Reinvestment Act (ARRA) is making a meaningful down payment on the nation's energy and environmental future. The Recovery Act investments in Colorado are ...

  14. Clean Cities: Southern Colorado Clean Cities coalition

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Colorado Clean Cities coalition Contact Information Kyle Lisek 303-847-0271 klisek@lungs.org Coalition Website Clean Cities Coordinator Kyle Lisek Kyle Lisek is coordinator of...

  15. Lafayette, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    district.12 Registered Energy Companies in Lafayette, Colorado Bella Energy formely Sun Electric Systems Composite Technology Development Porous Power Technologies Porous...

  16. Boulder, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Institute Registered Networking Organizations in Boulder, Colorado American Solar Energy Society Boulder Innovation Center CleanTech Boulder Western Resource Advocates...

  17. Colorado Springs Utilities- Energy Efficient Builder Program

    Broader source: Energy.gov [DOE]

    The Colorado Springs Utilities (CSU) Energy Efficient Builder Program offers an incentive to builders who construct ENERGY STAR qualified homes within the CSU service area. The incentive range...

  18. Colorado State University Industrial Assessment Center Saves...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    small- and medium-sized manufacturing companies with no-cost energy assessments, while ... Through IAC assistance, manufacturers have saved Colorado companies more than 19 million ...

  19. First Amendment to Programmatic Agreement for Colorado | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Colorado First Amendment to Programmatic Agreement for Colorado First amendment to the programmatic agreement between DOE, the Colorado Governor's Energy Office, and the Colorado State Historic Preservation Office regarding EECBG, SEP and WAP undertakings. First Amendment to Programmatic Agreement for Colorado (1.78 MB) More Documents & Publications Programmatic Agreement for Colorado Vermont State Historic Preservation Programmatic Agreement NEW JERSEY STATE HISTORIC PRESERVATION

  20. Comments of the Lower Colorado River Authority | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lower Colorado River Authority Comments of the Lower Colorado River Authority Comments of the Lower Colorado River Authority on Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy Comments of the Lower Colorado River Authority (54.12 KB) More Documents & Publications Lower Colorado River Authority Lower Colorado River Authority NBP RFI: Communications Requirements- Comments of Meeker Cooperative Light

  1. Ch. II, Waunita Hot Springs, Colorado Geothermal Prospect Reconaissanc...

    Open Energy Info (EERE)

    Hot Springs, Colorado Geothermal Prospect Reconaissance Author GeothermEx Editor T. G. Zacharakis Published Colorado Geological Survey in Cooperation with the U.S. Department...

  2. Colorado Department of Public Health and Environment: Watershed...

    Open Energy Info (EERE)

    Colorado Department of Public Health and Environment: Watershed 319 Website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Colorado Department of...

  3. Colorado - Access Permit Pre-Design Checklist | Open Energy Informatio...

    Open Energy Info (EERE)

    Jump to: navigation, search OpenEI Reference LibraryAdd to library General: Colorado - Access Permit Pre-Design Checklist Author Colorado Department of Transportation Published...

  4. Colorado's 1st congressional district: Energy Resources | Open...

    Open Energy Info (EERE)

    LLC BrightPhase Energy C Lock Technology Clean Energy Innovation Center Colorado Governor s Energy Office Colorado State Bank and Trust Conergy, Inc. Continuum Partners Crimson...

  5. Boulder Valley School District (Colorado) Power Purchase Agreement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Boulder Valley School District (Colorado) Power Purchase Agreement Case Study Boulder Valley School District (Colorado) Power Purchase Agreement Case Study Boulder Valley School ...

  6. Colorado State Bank and Trust | Open Energy Information

    Open Energy Info (EERE)

    Bank and Trust Jump to: navigation, search Name: Colorado State Bank and Trust Place: Denver, Colorado Zip: 80202 Sector: Renewable Energy Product: Leasing and lending for...

  7. Southern Colorado Plateau Geothermal Region | Open Energy Information

    Open Energy Info (EERE)

    Home Southern Colorado Plateau Geothermal Region Details Areas (0) Power Plants (0) Projects (0) Techniques (0) Map: Name "The Colorado Plateau is a high...

  8. Colorado Green Wind Power Project | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search Name Colorado Green Wind Power Project Facility Colorado Green Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service...

  9. Colorado Energy Office - Hydropower Website | Open Energy Information

    Open Energy Info (EERE)

    - Hydropower Website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Colorado Energy Office - Hydropower Website Author Colorado Energy Office...

  10. EERE Success Story-Colorado: Isothermal Battery Calorimeter Quantifies...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Colorado: Isothermal Battery Calorimeter Quantifies Heat Flow, Helps Make Safer, Longer-lasting Batteries EERE Success Story-Colorado: Isothermal Battery Calorimeter Quantifies ...