Wireless Roadside Inspection Field Operations.pub  

NLE Websites -- All DOE Office Websites (Extended Search)

Field Operational Test (FOT) Field Operational Test (FOT) Oak Ridge National Laboratory managed by UT-Battelle, LLC for the U.S. Department of Energy under Contract number DE-AC05-00OR22725 Research Areas Freight Flows Passenger Flows Supply Chain Efficiency Transportation: Energy Environment Safety Security Vehicle Technologies Research Brief T he U.S. Department of Transportation (DOT) Federal Motor Carrier Safety Administration (FMCSA) has commissioned the Wireless Roadside Inspection (WRI) Program to validate technologies and methodologies that can improve safety through inspections using wireless technologies that convey real-time identification of commercial vehicles, drivers, and carriers, as well as information about the status of the vehicles and their drivers. It is hypothesized that

2

Wireless Roadside Inspection Phase II Tennessee Commercial Mobile Radio Services Pilot Test Final Report  

SciTech Connect

The Federal Motor Carrier Safety Administration (FMCSA) Wireless Roadside Inspection (WRI) Program is researching the feasibility and value of electronically assessing truck and bus driver and vehicle safety at least 25 times more often than is possible using only roadside physical inspections. The WRI program is evaluating the potential benefits to both the motor carrier industry and to government. These potential benefits include reduction in accidents, fatalities and injuries on our highways and keeping safe and legal drivers and vehicles moving on the highways. WRI Pilot tests were conducted to prototype, test and demonstrate the feasibility and benefits of electronically collecting safety data message sets from in-service commercial vehicles and performing wireless roadside inspections using three different communication methods. This report summarizes the design, conduct and results of the Tennessee CMRS WRI Pilot Test. The purpose of this Pilot test was to demonstrate the implementation of commercial mobile radio services to electronically request and collect safety data message sets from a limited number of commercial vehicles operating in Tennessee. The results of this test have been used in conjunction with the results of the complimentary pilot tests to support an overall assessment of the feasibility and benefits of WRI in enhancing motor carrier safety (reduction in accidents) due to increased compliance (change in motor carrier and driver behavior) caused by conducting frequent safety inspections electronically, at highway speeds, without delay or need to divert into a weigh station

Franzese, Oscar [ORNL; Lascurain, Mary Beth [ORNL; Capps, Gary J [ORNL; Siekmann, Adam [ORNL

2011-05-01T23:59:59.000Z

3

Wireless Roadside Inspection Proof of Concept Test Final Report  

SciTech Connect

The U.S. Department of Transportation (DOT) FMCSA commissioned the Wireless Roadside Inspection (WRI) Program to validate technologies and methodologies that can improve safety through inspections using wireless technologies that convey real-time identification of commercial vehicles, drivers, and carriers, as well as information about the condition of the vehicles and their drivers. It is hypothesized that these inspections will: -- Increase safety -- Decrease the number of unsafe commercial vehicles on the road; -- Increase efficiency -- Speed up the inspection process, enabling more inspections to occur, at least on par with the number of weight inspections; -- Improve effectiveness -- Reduce the probability of drivers bypassing CMV inspection stations and increase the likelihood that fleets will attempt to meet the safety regulations; and -- Benefit industry -- Reduce fleet costs, provide good return-on-investment, minimize wait times, and level the playing field. The WRI Program is defined in three phases which are: Phase 1: Proof of Concept Test (POC) Testing of commercially available off-the-shelf (COTS) or near-COTS technology to validate the wireless inspection concept. Phase 2: Pilot Test Safety technology maturation and back office system integration Phase 3: Field Operational Test Multi-vehicle testing over a multi-state instrumented corridor This report focuses on Phase 1 efforts that were initiated in March, 2006. Technical efforts dealt with the ability of a Universal Wireless Inspection System (UWIS) to collect driver, vehicle, and carrier information; format a Safety Data Message Set from this information; and wirelessly transmit a Safety Data Message Set to a roadside receiver unit or mobile enforcement vehicle.

Capps, Gary J [ORNL; Franzese, Oscar [ORNL; Knee, Helmut E [ORNL; Plate, Randall S [ORNL; Lascurain, Mary Beth [ORNL

2009-03-01T23:59:59.000Z

4

Wireless Roadside Inspection (WRI) Field Operational Test (FOT)  

E-Print Network (OSTI)

, system loading, and back office system integration (2008- 2011) Several vehicles Alternative technology system (consisting of partners, hardware, software, and vehicles) is small enough to be manageable of Operation, and Architecture. #12;Center for Transportation Analysis 2360 Cherahala Boulevard Knoxville, TN

5

Wireless Roadside Inspection Proof-of-Concept Test  

E-Print Network (OSTI)

Wireless Roadside Inspection Proof-of-Concept Test Phase 1A ­ Generating SDMS PeopleNet, a producer Message Set (SDMS). Data obtained during a 10-hour test was compared to similar data obtained through. DESCRIPTIONRESULTS The majority of the data obtained from the PeopleNet SDMS was accurate. However, the tested system

6

WRI Pilot Test 2012.pub  

NLE Websites -- All DOE Office Websites (Extended Search)

Phase 2: Pilot Test Phase 2: Pilot Test Oak Ridge National Laboratory managed by UT-Battelle, LLC for the U.S. Department of Energy under Contract number DE-AC05-00OR22725 Research Areas Freight Flows Passenger Flows Supply Chain Efficiency Transportation: Energy Environment Safety Security Vehicle Technologies Research Brief T he U.S. Department of Transportation (DOT) Federal Motor Carrier Safety Administration (FMCSA) has commissioned the Wireless Roadside Inspection (WRI) Program to validate technologies and methodologies that can improve safety through inspections using wireless technologies that convey real-time identification of commercial vehicles, drivers, and carriers, as well as information about the status of the vehicles and their drivers. It is

7

Microsoft PowerPoint - WRI_Pre-FOT_Overview.ppt [Compatibility Mode]  

NLE Websites -- All DOE Office Websites (Extended Search)

Analysis, Research, and Technology Analysis, Research, and Technology Wireless Roadside Inspection Program Pre-Field Operational Test Presented to Gary Capps Technical Director, CMVRTC 865-946-1285 Chris Flanigan Technology Division 202-385-2433 FMCSA Office of Analysis, Research and Technology 2 2 WRI Program Vision & Goal ► Vision  Motor Carrier safety improved through dramatic increases in roadside safety inspections  Frequent driver and vehicle safety assessments ensure compliance  Safe and legal motor carrier transportation not hindered  Wide industry and public agency participation ► Goal  Improved motor carrier safety (reduction in accidents) due to increased compliance (change in motor carrier and driver behavior) in response to a higher frequency of roadside safety inspections using

8

Microsoft PowerPoint - Wireless Roadside Inspection Pilot Test.ppt [Compatibility Mode]  

NLE Websites -- All DOE Office Websites (Extended Search)

Overview Every year the number of trucks on the road, and the numbers of miles those trucks drive increases while the roadside safety inspection resources remain constant. The likelihood of a roadside inspection is far less than of a truck being weighed. Only about 3.4 million annual truck inspections are performed annually, compared to the 85 million (92 M WIM) weight inspections. Safety Data Message Set Contents Data Bus: SAEJ1708/SAEJ1587, SAEJ1939 Electronic On-Board Recorder (EOBR) Data Driver's Log (Duty Status + Location of Duty Status Change over time) Identifiers Driver license jurisdiction and ID Vehicle identification number (VIN) Vehicle state and plate Motor carrier/coach USDOT number Shipping document ID Equipment (e.g., trailer) ID Vehicle Measures

9

CMVRTC: WRI Pilot  

NLE Websites -- All DOE Office Websites (Extended Search)

WRI PRE-FOt WRI PRE-FOt diagram The purpose of this Pre-FOT is to provide a bridge between the just-completed WRI Commercial Mobile Radio Services (CMRS) Pilot Test (Pilot Test) (31 Jan 11) and the desired large-scale FOT (2014). A bridge is needed because critical portions of the WRI CMRS Pilot Test were not completed or fully tested (e.g. pull-in/by-pass, safety sensor data present in Safety Data Message (SDM), flexible geo-fencing, carrier interface), and the Government Back Office System (GBOS) was not developed in a way to support real, large-scale WRI testing (e.g., interface not relevant to enforcement, system not stable or robust, safety sensor data not understood by developers). This effort, the WRI CMRS Pre-FOT End-to-End System Validation (WRI Pre-FOT), seeks to develop and test a complete end-to-end

10

World Resources Institute (WRI) | Open Energy Information  

Open Energy Info (EERE)

Resources Institute (WRI) Resources Institute (WRI) (Redirected from World Resources Institute) Jump to: navigation, search Logo: World Resources Institute Name World Resources Institute Address 10 G Street, NE (Suite 800) Place Washington, District of Columbia Zip 20002 Year founded 1982 Phone number (202) 729-7600 Coordinates 38.8989821°, -77.0081139° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.8989821,"lon":-77.0081139,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

11

WRI-The Governance of Forests Toolkit | Open Energy Information  

Open Energy Info (EERE)

WRI-The Governance of Forests Toolkit WRI-The Governance of Forests Toolkit Jump to: navigation, search Tool Summary LAUNCH TOOL Name: WRI-The Governance of Forests Toolkit Agency/Company /Organization: World Resources Institute Sector: Land, Climate Focus Area: Forestry Resource Type: Publications Website: pdf.wri.org/working_papers/gfi_tenure_indicators_sep09.pdf Cost: Free WRI-The Governance of Forests Toolkit Screenshot References: WRI-The Governance of Forests Toolkit[1] "The Governance of Forests Initiative (GFI) seeks to bring widely accepted principles of good governance to bear on the challenges of sustaining forests in developing countries. GFI is a collaboration of the World Resources Institute, Imazon (Brazil) and the Instituto Centro de Vida (Brazil). This document presents the GFI Toolkit (Version 1) and outlines a process

12

WRI-Earth Trends Data | Open Energy Information  

Open Energy Info (EERE)

WRI-Earth Trends Data WRI-Earth Trends Data Jump to: navigation, search Tool Summary LAUNCH TOOL Name: WRI-Earth Trends Data Agency/Company /Organization: World Resources Institute Sector: Energy Resource Type: Dataset, Maps Website: www.wri.org/project/earthtrends WRI-Earth Trends Data Screenshot References: Earth Trends Data[1] About "Based on the World Resources series, EarthTrends is a free on-line resource that highlights the environmental, social, and economic trends that shape our world. The site offers the public a comprehensive collection of vital statistics, maps, and graphics for more than 200 countries. Much of the environmental information on the internet is fragmented, buried, or only available at a price. EarthTrends gathers data from more than 40 of the world's leading statistical agencies, along with

13

Roadside Testing Laboratory Media Event  

NLE Websites -- All DOE Office Websites (Extended Search)

Technology Showcase October 14, 2010 | Greeneville, Tennessee Background The Federal Motor Carrier Safety Administration (FMCSA) launched the Commercial Motor Vehicle Roadside...

14

Commercial Motor Vehicle Roadside Technology Corridor (CMVRTC)  

E-Print Network (OSTI)

Commercial Motor Vehicle Roadside Technology Corridor (CMVRTC) Oak Ridge National Laboratory Safety Security Vehicle Technologies Research Brief T he Commercial Motor Vehicle Roadside Technology in Tennessee to demonstrate, test, evaluation, and showcase innovative commercial motor vehicle (CMV) safety

15

Microsoft Word - WRI50 Report-finaldraft-1312005.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

i i WRI 50: Strategies for Cooling Electric Generating Facilities Utilizing Mine Water: Technical and Economic Feasibility Project Final Report Reporting period start date: November 1, 2003 Reporting period start date: September 30, 2004 Principal Authors (alphabetical) Joseph J. Donovan, Ph.D. Brenden Duffy Bruce R. Leavitt, P.E., P.Geol. James Stiles, Ph.D., P.E. Tamara Vandivort Paul Ziemkiewicz, Ph.D., Principal Investigator Date Report was issued: November 2004 DOE Award Number DE-FC26-03NT41908 Submitted to: U.S. Department of Energy National Energy Technology Laboratory PO Box 10940 626 Cochrans Mill Road Pittsburgh, PA 15235-0940 Submitted by: West Virginia Water Research Institute West Virginia University PO Box 6064 Morgantown, WV 26506-6064

16

Event:WRI-Training: How to Establish a National Program for Companies...  

Open Energy Info (EERE)

2) Jump to: navigation, search Calendar.png WRI-Training: How to Establish a National Program for Companies to Report GHG Emissions (Day 2): on 20110830 This regional workshop...

17

Event:WRI-Training: How to Establish a National Program for Companies...  

Open Energy Info (EERE)

4) Jump to: navigation, search Calendar.png WRI-Training: How to Establish a National Program for Companies to Report GHG Emissions (Day 4): on 20110901 This regional workshop...

18

Event:WRI-Training: How to Establish a National Program for Companies...  

Open Energy Info (EERE)

Calendar.png WRI-Training: How to Establish a National Program for Companies to Report GHG Emissions (Day 3): on 20110831 This regional workshop will provide training for...

19

Event:WRI-Training: How to Establish a National Program for Companies...  

Open Energy Info (EERE)

Calendar.png WRI-Training: How to Establish a National Program for Companies to Report GHG Emissions (Day 1): on 20110829 This regional workshop will provide training for...

20

Event:WRI-Training: How to Establish a National Program for Companies...  

Open Energy Info (EERE)

Calendar.png WRI-Training: How to Establish a National Program for Companies to Report GHG Emissions (Day 5): on 20110902 This regional workshop will provide training for...

Note: This page contains sample records for the topic "roadside inspection wri" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

DOE-WRI Base Program for Fundamental Advances in Energy Science and Technology  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE-WRI BasE PROgRam FOR DOE-WRI BasE PROgRam FOR FunDamEntal aDvancEs In EnERgy scIEncE anD tEchnOlOgy Description For over two decades, the University of Wyoming Research Corporation - doing business as the Western Research Institute (WRI) - has been supporting the U.S. Department of Energy (DOE) Office of Fossil Energy (FE) and its mission of developing fossil energy and related environmental technologies. The funding for these research efforts has generally been provided through congressionally mandated cooperative agreements, with the DOE's National Energy Technology Laboratory (NETL) overseeing program efforts. For this purpose, there are two current types of cooperative agreements: the Base Program, which is fully funded by federal money, and the Jointly Sponsored Research (JSR) Program,

22

DOE-WRI Jointly Sponsored Research Program on Energy-Related Topics  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Systems Power Systems Advanced Research ContaCts Kamalendu Das Project Manager Gasification and Combustion Projects Division National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507 304-285-4065 kamal.das@netl.doe.gov Robert R. Romanosky Technology Manager Advanced Research National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507 304-285-4721 robert.romanosky@netl.doe.gov Vijay K. sethi Western Research Institute 365 North 9th Street P.O. Box 3395 Laramie, WY 82072-3380 307-721-2376 vsethi@uwyo.edu http://wri.uwyo.edu/ DOE-WRI JOIntly SpOnSORED RESEaRch pROgRam On EnERgy-RElatED tOpIcS Description For over two decades, the University of Wyoming Research Corporation - doing business as the Western Research Institute (WRI) - has been supporting the

23

Pilot Testing of WRI'S Novel Mercury Control Technology by Pre-Combustion Thermal Treatment of Coal  

Science Conference Proceedings (OSTI)

The challenges to the coal-fired power industry continue to focus on the emission control technologies, such as mercury, and plant efficiency improvements. An alternate approach to post-combustion control of mercury, while improving plant efficiency deals with Western Research Institute's (WRI)'s patented pre-combustion mercury removal and coal upgrading technology. WRI was awarded under the DOE's Phase III Mercury program, to evaluate the effectiveness of WRI's novel thermal pretreatment process to achieve >50% mercury removal, and at costs of Edison (DTE), and SaskPower to undertake this evaluation. The technical objectives of the project were structured in two phases: Phase I--coal selection and characterization, and bench-and PDU-scale WRI process testing and; and Phase II--pilot-scale pc combustion testing, design of an integrated boiler commercial configuration, its impacts on the boiler performance and the economics of the technology related to market applications. This report covers the results of the Phase I testing. The conclusion of the Phase I testing was that the WRI process is a technically viable technology for (1) removing essentially all of the moisture from low rank coals, thereby raising the heating value of the coal by about 30% for subbituminous coals and up to 40% for lignite coals, and (2) for removing volatile trace mercury species (up to 89%) from the coal prior to combustion. The results established that the process meets the goals of DOE of removing <50% of the mercury from the coals by pre-combustion methods. As such, further testing, demonstration and economic analysis as described in the Phase II effort is warranted and should be pursued.

Alan Bland; Jesse Newcomer; Kumar Sellakumar

2008-08-17T23:59:59.000Z

24

Vendor / Technology A  

NLE Websites -- All DOE Office Websites (Extended Search)

Mobile Radio Mobile Radio Service (WRI - CMRS) Commercial Motor Vehicle Roadside Technology Corridor Safety Technology Showcase October 14, 2010 Commercial Motor Vehicle Roadside Technology Corridor Universal ID Pilot Test WRI Overview * The goal: Improved motor carrier safety due to increased compliance caused by higher frequency of roadside safety inspections using wireless technologies. * Benefits * Improved safety of CMVs and their operation * Reductions in accidents * Increased productivity and mobility of the transportation system * Increased security and livability Universal ID Pilot Test The CMRS Platform for WRI * CMRS - Commercial Mobile Radio Services * Includes telematics devices (such as electronic on-board recorders) Universal ID Pilot Test

25

Pilot Testing of WRI'S Novel Mercury Control Technology by Pre-Combustion Thermal Treatment of Coal  

SciTech Connect

The challenges to the coal-fired power industry continue to focus on the emission control technologies, such as mercury, and plant efficiency improvements. An alternate approach to post-combustion control of mercury, while improving plant efficiency deals with Western Research Institute's (WRI)'s patented pre-combustion mercury removal and coal upgrading technology. WRI was awarded under the DOE's Phase III Mercury program, to evaluate the effectiveness of WRI's novel thermal pretreatment process to achieve >50% mercury removal, and at costs of <$30,000/lb of Hg removed. WRI has teamed with Etaa Energy, Energy and Environmental Research Center (EERC), Foster Wheeler North America Corp. (FWNA), and Washington Division of URS (WD-URS), and with project co-sponsors including Electric Power Research Institute (EPRI), Southern Company, Basin Electric Power Cooperative (BEPC), Montana-Dakota Utilities (MDU), North Dakota Industrial Commission (NDIC), Detroit Edison (DTE), and SaskPower to undertake this evaluation. The technical objectives of the project were structured in two phases: Phase I--coal selection and characterization, and bench-and PDU-scale WRI process testing and; and Phase II--pilot-scale pc combustion testing, design of an integrated boiler commercial configuration, its impacts on the boiler performance and the economics of the technology related to market applications. This report covers the results of the Phase I testing. The conclusion of the Phase I testing was that the WRI process is a technically viable technology for (1) removing essentially all of the moisture from low rank coals, thereby raising the heating value of the coal by about 30% for subbituminous coals and up to 40% for lignite coals, and (2) for removing volatile trace mercury species (up to 89%) from the coal prior to combustion. The results established that the process meets the goals of DOE of removing <50% of the mercury from the coals by pre-combustion methods. As such, further testing, demonstration and economic analysis as described in the Phase II effort is warranted and should be pursued.

Alan Bland; Jesse Newcomer; Kumar Sellakumar

2008-08-17T23:59:59.000Z

26

Assessment of heavy metal contamination of roadside soils in ...  

Science Conference Proceedings (OSTI)

Feb 16, 2008 ... heavy metals was found using factor analysis. Keywords Heavy metals Roadside soils . Transportation period Contamination index .

27

Event:WRI-Training: How to Establish a National Program for Companies to  

Open Energy Info (EERE)

3): on 2011/08/31 3): on 2011/08/31 This regional workshop will provide training for interested organizations on how to establish and implement national- or regional-level corporate greenhouse gas (GHG) emissions reporting programs and trainings. Members of the Brazil GHG Protocol Program, the Mexico GHG Protocol Program, and the US-based team of the GHG Protocol will be presenting their experiences, sharing lessons learned, and providing training to workshop participants. Participation is free and limited travel support is available. The workshop will include two sessions. Participants are invited to attend both or only the session most relevant to their needs. English Spanish Event Details Name WRI-Training: How to Establish a National Program for Companies to Report GHG Emissions (Day 3)

28

Event:WRI-Training: How to Establish a National Program for Companies to  

Open Energy Info (EERE)

Calendar.png Calendar.png WRI-Training: How to Establish a National Program for Companies to Report GHG Emissions (Day 4): on 2011/09/01 This regional workshop will provide training for interested organizations on how to establish and implement national- or regional-level corporate greenhouse gas (GHG) emissions reporting programs and trainings. Members of the Brazil GHG Protocol Program, the Mexico GHG Protocol Program, and the US-based team of the GHG Protocol will be presenting their experiences, sharing lessons learned, and providing training to workshop participants. Participation is free and limited travel support is available. The workshop will include two sessions. Participants are invited to attend both or only the session most relevant to their needs. English

29

Event:WRI-Training: How to Establish a National Program for Companies to  

Open Energy Info (EERE)

Calendar.png Calendar.png WRI-Training: How to Establish a National Program for Companies to Report GHG Emissions (Day 2): on 2011/08/30 This regional workshop will provide training for interested organizations on how to establish and implement national- or regional-level corporate greenhouse gas (GHG) emissions reporting programs and trainings. Members of the Brazil GHG Protocol Program, the Mexico GHG Protocol Program, and the US-based team of the GHG Protocol will be presenting their experiences, sharing lessons learned, and providing training to workshop participants. Participation is free and limited travel support is available. The workshop will include two sessions. Participants are invited to attend both or only the session most relevant to their needs. English

30

Event:WRI-Training: How to Establish a National Program for Companies to  

Open Energy Info (EERE)

5): on 2011/09/02 5): on 2011/09/02 This regional workshop will provide training for interested organizations on how to establish and implement national- or regional-level corporate greenhouse gas (GHG) emissions reporting programs and trainings. Members of the Brazil GHG Protocol Program, the Mexico GHG Protocol Program, and the US-based team of the GHG Protocol will be presenting their experiences, sharing lessons learned, and providing training to workshop participants. Participation is free and limited travel support is available. The workshop will include two sessions. Participants are invited to attend both or only the session most relevant to their needs. English Spanish Event Details Name WRI-Training: How to Establish a National Program for Companies to Report GHG Emissions (Day 5)

31

Event:WRI-Training: How to Establish a National Program for Companies to  

Open Energy Info (EERE)

1): on 2011/08/29 1): on 2011/08/29 This regional workshop will provide training for interested organizations on how to establish and implement national- or regional-level corporate greenhouse gas (GHG) emissions reporting programs and trainings. Members of the Brazil GHG Protocol Program, the Mexico GHG Protocol Program, and the US-based team of the GHG Protocol will be presenting their experiences, sharing lessons learned, and providing training to workshop participants. Participation is free and limited travel support is available. The workshop will include two sessions. Participants are invited to attend both or only the session most relevant to their needs. English Spanish Event Details Name WRI-Training: How to Establish a National Program for Companies to Report GHG Emissions (Day 1)

32

CMVRTC: Current Research  

NLE Websites -- All DOE Office Websites (Extended Search)

Current reseach projects Current reseach projects Wireless Roadside Inspection Field Operational Test (WRI-FOT) Brake Defect Causation and Abatement Study Infrared-Based Screening System Overweight Vehicle Defect Study WRI-fot WRI-FOT roadmap In Fall of 2012, FMCSA kicked offed the WRI-FOT Program to validate technologies and methodologies that can improve safety through inspections using wireless technologies that convey real-time identification of commercial motor vehicles (CMV), drivers, and carriers, as well as information about the status of the vehicles and their drivers. It is believed that these inspections will (1) increase CMV safety, (2) increase inspection efficiency, (3) improve inspection effectiveness by reducing the probability of drivers bypassing CMV inspection stations and

33

Roadsides, contaminated fields could be unlikely solutions to fuel  

NLE Websites -- All DOE Office Websites (Extended Search)

Roadsides, contaminated fields could be unlikely solutions to fuel Roadsides, contaminated fields could be unlikely solutions to fuel shortages, water pollution By Louise Lerner * August 11, 2009 Tweet EmailPrint ARGONNE, Ill. - The lonely, weed-choked roadsides along America's highways may turn out to be an unexpected solution to two of the biggest issues facing the U.S. today-potential fuel shortages and water pollution. In a new study, environmental scientists Cristina Negri and Gayathri Gopalakrishnan of the U.S. Department of Energy's (DOE) Argonne National Laboratory considered a new idea: using contaminated and unused land to grow crops for biofuel. Negri and Gopalakrishnan knew that hardy, inedible plants like switchgrass or poplar trees grow quickly and need far less attention than conventional biofuel crops like corn-and it turns out they may also purify water and

34

Scheduling in Green Vehicular Infrastructure with Multiple Roadside Units  

E-Print Network (OSTI)

Hammad and Terence D. Todd Department of Electrical and Computer Engineering McMaster University Hamilton-max energy usage of the roadside units for a given input sample function. This bound is used for comparisons of experiments show that the proposed scheduling algorithms perform well when compared to the energy lower bounds

Karakostas, George

35

Microsoft PowerPoint - WRI POC (Lascurain Poster 07).ppt [Compatibility Mode]  

NLE Websites -- All DOE Office Websites (Extended Search)

Inspection Inspection Proof-of-Concept Test Phase 1A - Generating SDMS PeopleNet, a producer of current electronic on- board recorder (EOBR) technology, designed a system to produce a Safety Data Message Set (SDMS). Data obtained during a 10-hour test was compared to similar data obtained through an ORNL monitoring system comprised of an eDAQ- lite, VBOX III, Air-Weigh, and custom software. DESCRIPTION RESULTS The majority of the data obtained from the PeopleNet SDMS was accurate. However, the tested system was unable to include the weight and ABS flag components of the SDMS. Also, over an hour was required in some cases for driver status changes to be reflected in the SDMS. Safety inspections are performed on commercial vehicles to promote safety on the roadways;

36

Placement of Traffic Barriers on Roadside and Median Slopes  

E-Print Network (OSTI)

Cross median crashes have become a serious problem in recent years. Most of the median cross sections used for divided highways have terrains with steep slopes. Traffic barriers, frequently used on slopes, are generally designed based on the findings obtained from crash tests performed on flat terrain. For barriers placed on roadside and median slopes, vehicle impact height varies depending on the trajectory of the vehicle along the ditch section and lateral offset of the barrier. Thus depending on the placement location on a relatively steep slope, a barrier can be impacted by an errant vehicle at height and orientation more critical compared to those considered during its design. Hence, detailed study of performance of barriers on roadside and median slopes is needed to achieve acceptable safety performance. In this study, performances of modified G4(1S) W-beam, Midwest Guardrail System (MGS), modified Thrie-beam, modified weak post W-beam, and box-beam guardrail systems on sloped terrains are investigated using numerical simulations. A procedure is developed that provide guidance for their placement on roadside and median slopes. The research approach consists of nonlinear finite element analyses and multi-rigid-body dynamic analyses approach. Detailed finite element representation for each of the barriers is developed using LS-DYNA. Model fidelity is assessed through comparison of simulated and measured responses reported in full scale crash test studies conducted on flat terrain. LS-DYNA simulations of vehicle impacts on barriers placed on flat terrain at different impact heights are performed to identify performance limits of the barriers in terms of acceptable vehicle impact heights. The performances of the barriers are evaluated following the guidelines provided in NCHRP Report 350. Multi-rigid-body dynamic analysis code, CARSIM, is used to identify trajectories of the vehicles traversing various roadside and median cross-slopes. After analyzing vehicle trajectories and barrier performance limits, a guideline has been prepared with recommendations for the placement of barriers along roadside and median slopes. This guideline is then verified and refined using the responses obtained from full-scale LS-DYNA simulations. These simulations capture the full encroachment event from departure of the vehicle off the traveled way through impact with the barrier.

Ferdous, Md Rubiat

2011-05-01T23:59:59.000Z

37

Inspection Report REPORT ON INSPECTION REGARDINGSMALL BUSINESS...  

NLE Websites -- All DOE Office Websites (Extended Search)

REPORT ON INSPECTION REGARDINGSMALL BUSINESS CONTRACTING STATISTICS REPORTING ANDPRESENTATION, INS-O-98-02 Inspection Report REPORT ON INSPECTION REGARDINGSMALL BUSINESS...

38

CMVRTC: WRI POC  

NLE Websites -- All DOE Office Websites (Extended Search)

of the safety data message system (SDMS); Secure the "best available" wireless technology and communications support; Define the required inputs for the UWIS based on...

39

Microsoft Word - 13-04  

NLE Websites -- All DOE Office Websites (Extended Search)

4 4 2360 Cherahala Boulevard Knoxville, TN 37932 Three States Join the CMVRTC As a part of the planned expansion of the Commercial Motor Vehicle Roadside Technology Corridor (CMVRTC) to support the Wireless Roadside Inspection (WRI) Program, three states have joined the CMVRTC in addition to the charter state of Tennessee. The new states are Georgia, Kentucky, and North Carolina. Commercial vehicle enforcement personnel from these states will aid in collection of field data on WRI and other safety related projects. The addition of these states adds about 1,700 miles of interstate roadway to the test bed portion of the CMVRTC along the I-75 and I-40 corridors. Discussions with Arkansas, Mississippi, and Virginia are currently underway. The CMVRTC team members are Gary Capps, Oscar

40

Crossarm Inspection and Assessment  

Science Conference Proceedings (OSTI)

Linemen frequently use wood pole inspection methods to inspect crossarms, and little work has been done to specifically address the inspection of wood, steel, or fiberglass crossarms. This report outlines the development of a test bed and associated protocols required to assess currently available and prospective inspection technologies and techniques for evaluation of in-service crossarms.

2009-12-23T23:59:59.000Z

Note: This page contains sample records for the topic "roadside inspection wri" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Remote monitoring of emissions using on-vehicle sensing and vehicle to roadside communications  

DOE Green Energy (OSTI)

Recent developments in on-vehicle electronics makes practical remote monitoring of vehicle emissions compliance with CARB and EPA regulations. A system consisting of emission controls malfunction sensors, an on-board computer (OBC), and vehicle-to-roadside communications (VRC) would enable enforcement officials to remotely and automatically detect vehicle out-of-compliance status. Remote sensing could be accomplished at highway speeds as vehicles pass a roadside RF antenna and reader unit which would interrogate the on- vehicle monitoring and recording system. This paper will focus on the hardware system components require to achieve this goal with special attention to the VRC; a key element for remote monitoring. this remote sensing concept piggybacks on the development of inexpensive VRC equipment for automatic vehicle identification for electronic toll collection and intelligent transportation applications. Employing an RF transponder with appropriate interface to the OBC and malfunction sensors, a practical monitoring system can be developed with potentially important impact on air quality and enforcement. With such a system in place, the current -- and costly and ineffective -- emission control strategy of periodic smog checking could be replaced or modified.

Davis, D.T.

1995-06-01T23:59:59.000Z

42

User Electrical Inspection Criteria  

NLE Websites -- All DOE Office Websites (Extended Search)

User Electronic and Electrical Equipment Inspection Criteria User Electronic and Electrical Equipment Inspection Criteria Any electrical or electronic equipment users bring to the APS will have to be inspected. In some cases, this inspection will be quite simple, e.g., if the equipment has already been inspected by a Nationally Recognized Testing Laboratory (NRTL) and is used for its designed purpose. Other equipment will require a more thorough inspection (this may include NRTL inspected equipment if it is assembled into an apparatus with other components). The inspection is based on an eight-part list of criteria. Paraphrased, those criteria are: The equipment must be suitable for its intended use (and if appropriate, installation). For example, a heater controller intended to control a 1000W heater cannot be used to control a 2000W heater. The

43

Design of Roadside Barrier Systems Placed on Mechanically Stabilized Earth (MSE) Retaining Walls  

E-Print Network (OSTI)

Millions of square feet of mechanically stabilized earth retaining wall are constructed annually in the United States. When used in highway fill applications in conjunction with bridges, these MSE walls are typically constructed with a roadside barrier system supported on the edge of the wall. This barrier system generally consists of a traffic barrier or bridge rail placed on a continuous footing or structural slab. The footing is intended to reduce the influence of barrier impact loads on the retaining wall system by distributing the load over a wide area and to provide stability for the barrier against sliding or overturning. The proper design of the roadside barrier, the structural slab, and the MSE wall system requires a good understanding of relevant failure modes, how barrier impact loads are transferred into the wall system, and the magnitude and distribution of these loads. In this study, a procedure is developed that provides guidance for designing: 1. the barrier-moment slab, 2. the wall reinforcement, and 3. the wall panels. These design guidelines are developed in terms of AASHTO LRFD procedures. The research approach consisted of engineering analyses, finite element analyses, static load tests, full-scale dynamic impact tests, and a full-scale vehicle crash test. It was concluded that a 44.5 kN (10 kips) equivalent static load is appropriate for the stability design of the barrier-moment slab system. This will result in much more economical design than systems developed using the 240 kN (54 kips) load that some user agencies are using. Design loads for the wall reinforcement and wall panels are also presented.

Kim, Kang

2009-05-01T23:59:59.000Z

44

Inspection Report: IG-0774  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Inspection Report Inspection Report Material Control and Accountability at Los Alamos National Laboratory DOE/IG-0774 September 2007 U.S. Department of Energy Office of Inspector General Office of Inspections and Special Inquiries Department of Energy Washington, DC 20585 September 7,2007 MEMORANDUM FOR FROM: Insp~ct& General SUBJECT: INFORMATION: Inspection Report on "Material Control and Accountability at Los Alamos National Laboratory" BACKGROUND The Department of Energy's Los Alamos National Laboratory (LANL) has a national security mission that includes responsibility for the science, engineering and technology related to certain radioactive materials supporting the Nation's nuclear weapons program. These include materials

45

Optical fiber inspection system  

DOE Patents (OSTI)

A remote optical inspection system including an inspection head. The inspection head has a passageway through which pellets or other objects are passed. A window is provided along the passageway through which light is beamed against the objects being inspected. A plurality of lens assemblies are arranged about the window so that reflected light can be gathered and transferred to a plurality of coherent optical fiber light guides. The light guides transfer the light images to a television or other image transducer which converts the optical images into a representative electronic signal. The electronic signal can then be displayed on a signal viewer such as a television monitor for inspection by a person. A staging means can be used to support the objects for viewing through the window. Routing means can be used to direct inspected objects into appropriate exit passages for accepted or rejected objects. The inspected objects are advantageously fed in a singular manner to the staging means and routing means. The inspection system is advantageously used in an enclosure when toxic or hazardous materials are being inspected.

Moore, Francis W. (Richland, WA)

1987-01-01T23:59:59.000Z

46

Optical fiber inspection system  

DOE Patents (OSTI)

A remote optical inspection system including an inspection head. The inspection head has a passageway through which pellets or other objects are passed. A window is provided along the passageway through which light is beamed against the objects being inspected. A plurality of lens assemblies are arranged about the window so that reflected light can be gathered and transferred to a plurality of coherent optical fiber light guides. The light guides transfer the light images to a television or other image transducer which converts the optical images into a representative electronic signal. The electronic signal can then be displayed on a signal viewer such as a television monitor for inspection by a person. A staging means can be used to support the objects for viewing through the window. Routing means can be used to direct inspected objects into appropriate exit passages for accepted or rejected objects. The inspected objects are advantageously fed in a singular manner to the staging means and routing means. The inspection system is advantageously used in an enclosure when toxic or hazardous materials are being inspected. 10 figs.

Moore, F.W.

1985-04-05T23:59:59.000Z

47

Utility Line Inspections and Audits  

Science Conference Proceedings (OSTI)

Utility Line Inspections and Audits provides utility engineers with a concise reference for the pros, cons, and how to related to performing various line inspections and audits.

2007-03-21T23:59:59.000Z

48

Piping inspection round robin  

Science Conference Proceedings (OSTI)

The piping inspection round robin was conducted in 1981 at the Pacific Northwest National Laboratory (PNNL) to quantify the capability of ultrasonics for inservice inspection and to address some aspects of reliability for this type of nondestructive evaluation (NDE). The round robin measured the crack detection capabilities of seven field inspection teams who employed procedures that met or exceeded the 1977 edition through the 1978 addenda of the American Society of Mechanical Engineers (ASME) Section 11 Code requirements. Three different types of materials were employed in the study (cast stainless steel, clad ferritic, and wrought stainless steel), and two different types of flaws were implanted into the specimens (intergranular stress corrosion cracks (IGSCCs) and thermal fatigue cracks (TFCs)). When considering near-side inspection, far-side inspection, and false call rate, the overall performance was found to be best in clad ferritic, less effective in wrought stainless steel and the worst in cast stainless steel. Depth sizing performance showed little correlation with the true crack depths.

Heasler, P.G.; Doctor, S.R. [Pacific Northwest National Lab., Richland, WA (United States)

1996-04-01T23:59:59.000Z

49

Inspection Report: IG-0770  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S. Department of Energy U.S. Department of Energy Office of Inspector General Office of Inspections and Special Inquiries Inspection Report Protective Force MK-19 Grenade Launcher Use at the National Nuclear Security Administration's Pantex Facility DOE/IG-0770 July 2007 Department of Energy Washington, DC 20585 July 2 0 , 2007 MEMORANDUM FOR TWSECRETARY FROM: 4- Greg ry . riedman Inspector General SUBJECT: INFORMATION: Inspection Report on "Protective Force MK-19 Grenade Launcher Use at the National Nuclear Security Administration's Pantex Facility" BACKGROUND The National Nuclear Security Administration's (NNSA) Pantex Facility is this Nation's only nuclear weapons assembly and disassembly facility. The nature of such work necessitates the development and implementation of protection strategies based upon the

50

Inspection Report: IG-0746  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

l nspector General l nspector General Office of Inspections and Special Inquiries Inspection Report Work Packages for Site Support Service; at Los Alamos National Laboratory Department of Energy Washington, DC 20585 November 29, 2006 MEMORANDUM FOR TI38 S E C m U R Y FROM: h p Gregor - . riedman Inspector General SUBJECT: INFORMATION: Inspection Report on "Work Packages for Site Support Services at Los Alalnos National Laboratory" The Department of Energy's Los Alarnos National Laboratory (LANL) enhances global security by ensuring the safety and reliability of the U.S. nuclear weapons stockpile; developing technical solutioils to reduce the threat of weapons of mass destnlction; and solving problems related to energy, environn~ent, infrastructure, healtl~, and national security. Site support services at the

51

rail inspections matrix  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

COMPARISON OF COMMERCIAL VEHICLE SAFETY ALLIANCE RECOMMENDED NATIONAL PROCEDURES COMPARISON OF COMMERCIAL VEHICLE SAFETY ALLIANCE RECOMMENDED NATIONAL PROCEDURES AND OUT-OF-SERVICE CRITERIA FOR THE ENHANCED SAFETY INSPECTION OF COMERCIAL HIGHWAY VEHICLES TRANSPORTING TRANSURANICS, SPENT NUCLEAR FUEL, AND HIGH LEVEL WASTE TO RAIL INSPECTION STANDARDS -TEC-WG, RAIL TOPIC GROUP 1 Commercial Vehicle Safety Alliance Requirement Applicable Federal Regulation (All 49CFR unless otherwise noted) AAR Rule or Standard Applicable Industry / Regulatory Initiatives / Recommended Practices 1.0 GENERAL 215-RAILROAD FREIGHT CAR SAFETY STANDARDS 221-REAR END MARKING DEVICE-PASSENGER, COMMUTER AND FREIGHT TRAINS 223-SAFETY GLAZING STANDARDS-LOCOMOTIVES, PASSENGER CARS AND CABOOSES 229-RAILROAD LOCOMOTIVE

52

Utilities Inspection Technologies  

E-Print Network (OSTI)

Preventive and predictive maintenance programs are enhanced by using various inspection technologies to detect problems and potential failures before catastrophic failure. This paper discusses successful inspection technologies that have been employed in industrial facilities within the Navy. Specific systems include compressed air, electrical distribution, natural gas, steam, and hot water. Technologies include: Enhanced optical methods (infrared thermography, boroscopes, and fiberscopes) Acoustic emissions and vibration signature analysis Locating and quantifying methods (deep probe temperature analysis, electromagnetic pipe and cable locators, holiday and fault locators, and radar mapping).

Messock, R. K.

1993-03-01T23:59:59.000Z

53

Independent Oversight Inspection, Argonne National Laboratory...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Inspection, Argonne National Laboratory, Volume 1 - May 2005 Independent Oversight Inspection, Argonne National Laboratory, Volume 1 - May 2005 May 2005 Inspection of Environment,...

54

Inspection Report: IG-0383 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

3 Inspection Report: IG-0383 January 16, 1996 Inspection of Human Subject Research in Intelligence and Intelligence-Related Projects Inspection Report: IG-0383...

55

Inspection Report: IG-0367 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 Inspection Report: IG-0367 March 16, 1995 Report on Inspection of an Intelligence Work-For-Others Project at the Idaho Operations Office Inspection Report: IG-0367...

56

Inspection Report: INS-9601 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

601 Inspection Report: INS-9601 October 13, 1996 Report on the Intelligence Oversight Inspection of the Special Technologies Laboratory Inspection Report: INS-9601...

57

Inspection, Sandia National Laboratories - April 2008 | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Inspection, Sandia National Laboratories - April 2008 Inspection, Sandia National Laboratories - April 2008 April 2008 Inspection of Environment, Safety and Health Programs at the...

58

Independent Oversight Inspection, Idaho National Laboratory ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Inspection, Idaho National Laboratory - August 2007 Independent Oversight Inspection, Idaho National Laboratory - August 2007 August 2007 Inspection of Environment, Safety, and...

59

Airborne Inspection Technology: Market Survey  

Science Conference Proceedings (OSTI)

This report presents findings of an investigation into various airborne inspection technologies currently used within the electric utility industry.

2002-03-04T23:59:59.000Z

60

Flexible ultrasonic pipe inspection apparatus  

DOE Patents (OSTI)

Pipe crawlers, pipe inspection {open_quotes}rabbits{close_quotes} and similar vehicles are widely used for inspecting the interior surfaces of piping systems, storage tanks and process vessels for damaged or flawed structural features. This paper describes the design of a flexible, modular ultrasonic pipe inspection apparatus.

Jenkins, C.F.; Howard, B.D.

1994-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "roadside inspection wri" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Inspection Report: IG-0821  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fire Suppression and Related Services Fire Suppression and Related Services at Los Alamos National Laboratory DOE/IG-0821 September 2009 U.S. Department of Energy Office of Inspector General Office of Inspections Department of Energy Washington, DC 20585 September 11, 2009 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Inspection Report on "Fire Suppression and Related Services at Los Alamos National Laboratory" BACKGROUND The Department of Energy's (DOE's) Los Alamos National Laboratory (LANL) is a multidisciplinary research institution engaged in strategic science on behalf of national security. LANL operates in "unique" hazard environments, to include special nuclear materials, explosives, and hazardous chemicals, that create special fire suppression and

62

NSLS Electrical Equipment Inspection  

NLE Websites -- All DOE Office Websites (Extended Search)

Electrical Equipment Inspection Information Electrical Equipment Inspection Information A note to vendors visiting NSLS A note to users visiting NSLS Proteus Electrical Conformity Remediation Currently Certified Electrical Equipment Inspectors: First Line Contacts Email Extension Poshka, Dennis poshka@bnl.gov 2825 Alternate Contacts Boerner Jr, Albert aboerner@bnl.gov 5990 Buda, Scott buda@bnl.gov 3914 Caruso, Michael caruso@bnl.gov 4100 Chmiel, Robert chmiel@bnl.gov 8141 Church, Randolph church@bnl.gov 2736 Clay, Barret clay@bnl.gov 7284 D'Alsace, Roy dalsace@bnl.gov 3973 Danneil, Christopher cdanneil@bnl.gov 8609 Davila, Peter davila@bnl.gov 7625 De Toll, Peter detoll@bnl.gov 4100 Durfee, Douglas ddurfee@bnl.gov 7625 Fulkerson, Michael fulkerso@bnl.gov 5194 Gallagher, John jgallagher@bnl.gov 5770 Harder, David dharder@bnl.gov 4978

63

Streamline magnetic inspection of OCTGs  

Science Conference Proceedings (OSTI)

This article reports that supply and demand imbalances in the drilling industry are allowing operators to make drilling contracts more stringent, despite reduced day rates. One typical requirement is more thorough inspection of drill string and bottomhole assemblies to ensure equipment-related failures don't increase costs. Magnetic inspection techniques for oil country tubular goods are becoming more advanced. However, common misperceptions often needlessly plague the inspection process. Today, almost all high-grade tubular goods are inspected in the plain-end state according to guidelines which are more stringent than those outlined by API inspection specification 5AX. Most tubular goods are inspected three to four times before the operator is satisfied they are suitable to run downhole. Often such inspections are conducted by different companies employing at least two techniques: magnetic flux leakage (MFL) and ultrasonics (US).

Stanley, R.

1987-01-01T23:59:59.000Z

64

Inspection tester for explosives  

DOE Patents (OSTI)

An inspection tester that can be used anywhere as a primary screening tool by non-technical personnel to determine whether a surface contains explosives. It includes a body with a sample pad. First and second explosives detecting reagent holders and dispensers are operatively connected to the body and the sample pad. The first and second explosives detecting reagent holders and dispensers are positioned to deliver the explosives detecting reagents to the sample pad. A is heater operatively connected to the sample pad.

Haas, Jeffrey S. (San Ramon, CA); Simpson, Randall L. (Livermore, CA); Satcher, Joe H. (Patterson, CA)

2010-10-05T23:59:59.000Z

65

Infrared microscope inspection apparatus  

DOE Patents (OSTI)

Apparatus and system for inspecting infrared transparents, such as an array of photovoltaic modules containing silicon solar cells, includes an infrared microscope, at least three sources of infrared light placed around and having their axes intersect the center of the object field and means for sending the reflected light through the microscope. The apparatus is adapted to be mounted on an X-Y translator positioned adjacent the object surface. 4 figs.

Forman, S.E.; Caunt, J.W.

1985-02-26T23:59:59.000Z

66

Inspection tester for explosives  

DOE Patents (OSTI)

An inspection tester that can be used anywhere as a primary screening tool by non-technical personnel to determine whether a surface contains explosives. It includes a body with a sample pad. First and second explosives detecting reagent holders and dispensers are operatively connected to the body and the sample pad. The first and second explosives detecting reagent holders and dispensers are positioned to deliver the explosives detecting reagents to the sample pad. A is heater operatively connected to the sample pad.

Haas, Jeffrey S. (San Ramon, CA); Simpson, Randall L. (Livermore, CA); Satcher, Joe H. (Patterson, CA)

2007-11-13T23:59:59.000Z

67

Piping inspection instrument carriage  

DOE Patents (OSTI)

This invention, an instrument carriage for inspection of piping, comprises front and rear leg assemblies for engaging the interior of the piping and supporting and centering the carriage therein, an instrumentation arm carried by a shaft system running from front to rear leg assemblies. The shaft system has a screw shaft for moving the arm axially and a spline gear for moving the arm azimuthally. The arm has a pair of air cylinders that raise and lower a plate in the radial direction. On the plate are probes including, an eddy current probe and an ultrasonic testing probe. The ultrasonic testing probe is capable of spinning 360[degrees] about its axis.

Hapstack, M.; Talarek, T.R.; Zollinger, W.T.; Heckendorn, F.M. II; Park, L.R.

1991-01-01T23:59:59.000Z

68

Piping inspection instrument carriage  

DOE Patents (OSTI)

This invention, an instrument carriage for inspection of piping, comprises front and rear leg assemblies for engaging the interior of the piping and supporting and centering the carriage therein, an instrumentation arm carried by a shaft system running from front to rear leg assemblies. The shaft system has a screw shaft for moving the arm axially and a spline gear for moving the arm azimuthally. The arm has a pair of air cylinders that raise and lower a plate in the radial direction. On the plate are probes including, an eddy current probe and an ultrasonic testing probe. The ultrasonic testing probe is capable of spinning 360{degrees} about its axis.

Hapstack, M.; Talarek, T.R.; Zollinger, W.T.; Heckendorn, F.M. II; Park, L.R.

1991-12-31T23:59:59.000Z

69

Inspection Technologies for Vegetation Management  

Science Conference Proceedings (OSTI)

Recent regulatory changes and budgetary pressures have prompted utilities to seek a more in-depth understanding of the terrain along their transmission line corridor rights-of-way (ROW) and the vegetation on that terrain. Vegetation inspections play an important role in acquiring this information and in avoiding costly vegetation-related outages. While the methods by which the inspections are conducted vary from utility to utility, some form of periodic inspections of transmission ROWs are ...

2012-12-14T23:59:59.000Z

70

Thermographic Inspections | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

being lost. Energy auditors may use thermography -- or infrared scanning -- to detect thermal defects and air leakage in building envelopes. How Thermographic Inspections Work...

71

BENCHMARKING EMERGING PIPELINE INSPECTION TECHNOLOGIES  

NLE Websites -- All DOE Office Websites (Extended Search)

FINAL REPORT Benchmarking Emerging Pipeline Inspection Technologies To Department of Energy National Energy Technology Laboratory (NETL) DE-AP26-04NT40361 and Department of...

72

Inspection system performance test procedure  

SciTech Connect

This procedure establishes requirements to administer a performance demonstration test. The test is to demonstrate that the double-shell tank inspection system (DSTIS) supplied by the contractor performs in accordance with the WHC-S-4108, Double-Shell Tank Ultrasonic Inspection Performance Specification, Rev. 2-A, January, 1995. The inspection system is intended to provide ultrasonic (UT) and visual data to determine integrity of the Westinghouse Hanford Company (WHC) site underground waste tanks. The robotic inspection system consists of the following major sub-systems (modules) and components: Mobile control center; Deployment module; Cable management assembly; Robot mechanism; Ultrasonic testing system; Visual testing system; Pneumatic system; Electrical system; and Control system.

Jensen, C.E.

1995-01-17T23:59:59.000Z

73

Ultrasonic methods for rail inspection  

E-Print Network (OSTI)

Impedance Measurements in Rail Steel, Materials Evaluation,Guided Wave System for Rail Inspection: An Update, JournalWave-based Monitoring of Rail Head: Laboratory and Field

Phillips, Robert Ronald

2012-01-01T23:59:59.000Z

74

The Design of an Inspection Robot for Boiler Tubes Inspection  

Science Conference Proceedings (OSTI)

A climbing robot with magnetic wheels is designed for the inspection of boiler tubes in fossil power plants, which can inspect the boiler tubes automatically. The climbing robot will move on the boiler tubes. The magnetic wheels of the robot can be move ... Keywords: boiler tubes, climbing robot, magnetic flux leakage sensor, VSC controller

Lu Xueqin; Qiu Rongfu; Liu Gang; Huang Fuzhen

2009-11-01T23:59:59.000Z

75

Amending constructed roadside and urban soils with large volume-based compost applications: effects on water quality  

E-Print Network (OSTI)

Mineral nutrients imported in composted dairy manure (CDM) and municipal biosolid (CMB) amendments for highway-rights-of-way and urban landscapes can pose a threat to surface water quality. Treatments were developed to evaluate recommendations for amending roadside and urban soils with compost at large volumebased rates. Texas Department of Transportation (TxDOT) recommendations were evaluated in 2002 and 2003. Municipal recommendations were evaluated in 2004. Treatments were imposed on 4 by 1.5-m field plots on a constructed soil with an 8.5% slope. Three TxDOT compost application methods were tested; incorporation at 25% by volume (CMT), topdressing over vegetation (GUC), and topdressing a 5-cm compost woodchip mix over bare soil (ECC). In 2003, a 12.5% CMT treatment was substituted for the GUC, and two contrasting composts were compared. In 2002, soil test phosphorus (STP) concentrations (mg kg-1) were 291, 360, 410, and 1921 mg kg-1 in the 0 to 5-cm layer of a course textured CMT, fine textured CMT, GUC, and ECC treatments, respectively using CDM. In 2003, STP concentrations were 264, 439, 496,623, 1115, and 2203 mg kg-1, in the 0 to 5-cm layer after incorporation of CDM and CMB at the 12.5 and 25% volume-based rates, and topdressing the 5-cm CDM- or CMB-woodchip mix over bare soil, respectively. In 2004, contrasting CMB products, relatively low or high in total phosphorus (TP) were incorporated into the soil at 12.5 and 25% by volume, or imported in transplanted sod at the 25% by volume rate. The STP concentrations were 87, 147, 180, 301, 322, and 544 mg kg-1, respective to the previously defined treatments. Runoff water from 14, 10, and 8 natural rain events was used to characterize nutrient and sediment transport in 2002, 2003, and 2004, respectively. Concentration of TDP in runoff water was highly variable for roadside treatments across rain events. Mass losses of TDP were similar after CDM or CMB were incorporated into the soil at 12.5 and 25% by volume. Compost incorporation was the most effective method for limiting TP loss in runoff. Roadway and urban soils are expected to contribute greater TP losses as P concentration increases in soils.

Hansen, Nels Edward

2005-12-01T23:59:59.000Z

76

2004 Annual Inspection for the  

Office of Legacy Management (LM)

for the for the Parkersburg, West Virginia, Nuclear Waste Policy Act Section 151(c) Disposal Site Summary The Parkersburg, West Virginia, Site was inspected on October 16, 2008, to confirm the integrity of visible features and to determine the need, if any, for maintenance, additional inspections, or monitoring. Results of the inspection conclude that the site is in excellent condition. Vegetation control activities (mow and spray) have been effective in reducing the populations of weed species present at the site. An area of poison hemlock re-growth and an area of poison ivy were identified during the inspection. Although the site is currently mowed twice a year, the grass was rather high at the time of the inspection. It is recommended that the frequency of

77

Ultrasonic inspection and deployment apparatus  

DOE Patents (OSTI)

An ultrasonic inspection apparatus for the inspection of metal structures, especially installed pipes. The apparatus combines a specimen inspection element, an acoustical velocity sensing element, and a surface profiling element, all in one scanning head. A scanning head bellows contains a volume of oil above the pipe surface, serving as acoustical couplant between the scanning head and the pipe. The scanning head is mounted on a scanning truck which is mobile around a circular track surrounding the pipe. The scanning truck has sufficient motors, gears, and position encoders to allow the scanning head six degrees of motion freedom. A computer system continually monitors acoustical velocity, and uses that parameter to process surface profiling and inspection data. The profiling data is used to automatically control scanning head position and alignment and to define a coordinate system used to identify and interpret inspection data. The apparatus is suitable for highly automated, remote application in hostile environments, particularly high temperature and radiation areas.

Michaels, Jennifer E. (Ithaca, NY); Michaels, Thomas E. (Ithaca, NY); Mech, Jr., Stephen J. (Pasco, WA)

1984-01-01T23:59:59.000Z

78

Radiographic Inspection of Fueled Clads  

SciTech Connect

Five general purpose heat source (GPHS) fueled clads were radiographically inspected at the Idaho National Laboratory (INL). The girth weld region of each clad had previously passed visual examination, ring gauge test, and leak test but showed positive indications on the ultrasonic (UT) test. Positive ultrasonic indications are allowable under certain weld conditions; radiographic inspection provides a secondary nonintrusive means of clad inspection and may confirm allowable anomalies from the UT inspection. All the positive UT indications were found to exhibit allowable weld shield fusion or mismatch conditions. No indication of void defects was found. One additional clad (FCO371) was deemed unacceptable for radiographic inspection due to an unknown black substance that obscured the angular origin on the weld so that the angular offset to the UT indication could not be found.

Timothy J. Roney; Karen M. Wendt

2005-04-01T23:59:59.000Z

79

Device for inspecting vessel surfaces  

DOE Patents (OSTI)

A portable, remotely-controlled inspection crawler for use along the walls of tanks, vessels, piping and the like. The crawler can be configured to use a vacuum chamber for supporting itself on the inspected surface by suction or a plurality of magnetic wheels for moving the crawler along the inspected surface. The crawler is adapted to be equipped with an ultrasonic probe for mapping the structural integrity or other characteristics of the surface being inspected. Navigation of the crawler is achieved by triangulation techniques between a signal transmitter on the crawler and a pair of microphones attached to a fixed, remote location, such as the crawler's deployment unit. The necessary communications are established between the crawler and computers external to the inspection environment for position control and storage and/or monitoring of data acquisition.

Appel, D. Keith (Aiken, SC)

1995-01-01T23:59:59.000Z

80

Deaerator inspection and analysis  

Science Conference Proceedings (OSTI)

Inspection of 11 deaerator systems at the Savannah River Plant (SRP) was performed after at least 30 years of service. Each deaerator system consists of a heater vessel and a storage vessel. Of 22 total vessels, only 11 were found to contain cracks, and these were repaired. The cracks ranged up to one inch in length, were both transverse and parallel to the welds, and none were through-wall. Weld samples were removed for metallurgical investigation, which revealed a very localized corrosion mechanism with a tightly bound oxide within the cracks. The operation and water chemistry of these deaerators are reviewed because up to four of these units operate in the same powerhouse and experience the same operating conditions.

Vormelker, P.R.

1987-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "roadside inspection wri" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

An Evaluation of Inspection Automation Tools  

Science Conference Proceedings (OSTI)

A key element in manufacturing quality software is the early detection of defects which can be fostered by inspection techniques. Inspections may be boosted by automated tools that help in various tasks during the whole inspection process. We present ...

Vesa Tenhunen; Jorma Sajaniemi

2002-06-01T23:59:59.000Z

82

Inspection Report: IG-0384 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

84 Inspection Report: IG-0384 January 18, 1996 Inspection of Concerns Regarding the Martin Marietta Corporate Review of Health and Safety at Martin Marietta Energy Systems...

83

Inspection Report: IG-0578 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

19, 2002 Inspection of Explosives Safety at Selected Department of Energy Sites The Office of Inspector General, U.S. Department of Energy (DOE), conducted an inspection at...

84

Inspection Report: IG-0671 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Report: IG-0671 January 18, 2005 Concerns Regarding the Department of Energy's Counterintelligence Inspection Program (U) This inspection report is not publicly releasable...

85

Inspection Report: IG-0619 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 Inspection Report: IG-0619 September 16, 2003 The Security Afforded Selected Tritium Reservoir Shipments (U) The inspection report is classified and is available for review by...

86

Request an Inspection of User Electrical Equipment  

NLE Websites -- All DOE Office Websites (Extended Search)

date, time, and location of the inspection Equipment list and description List any manualsdocumentationschematics that exist and are present to aid with the inspection. A...

87

Inspection Report: IG-0576 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

covers the Extrusion Plant and not the Metals Plant. Inspection Report: IG-0576 More Documents & Publications Inspection Report: IG-0530 Audit Report: IG-0541 Audit Report: IG-0558...

88

Independent Oversight Inspection, Argonne National Laboratory...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Inspection, Argonne National Laboratory - East, Summary Report - May 2002 Independent Oversight Inspection, Argonne National Laboratory - East, Summary Report - May 2002 May 2002...

89

Independent Oversight Inspection, Sandia National Laboratories...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sandia National Laboratories, Volume 1 - May 2005 Independent Oversight Inspection, Sandia National Laboratories, Volume 1 - May 2005 May 2005 Inspection of Environment, Safety,...

90

Independent Oversight Inspection, Sandia National Laboratories...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 Independent Oversight Inspection, Sandia National Laboratories - May 2009 May 2009 Inspection of Emergency Management at the Sandia Site Office and Sandia National Laboratories...

91

Inspection Report: IG-0809 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09 Inspection Report: IG-0809 January 2009 Pantex Laser Perimeter Awareness System This inspection report is not publicly releasable because it contains Unclassified Controlled...

92

Independent Oversight Inspection, Idaho National Laboratory ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 2005 Independent Oversight Inspection, Idaho National Laboratory - June 2005 June 2005 Inspection of Environment, Safety, and Health Programs at the Idaho National Laboratory...

93

Inspection Report: IG-0656 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 Inspection Report: IG-0656 August 10, 2004 Internal Controls Over Personal Computers at Los Alamos National Laboratory The Office of Inspector General initiated an inspection to...

94

OSDF Inspection Report  

Office of Legacy Management (LM)

29.1 12/12 29.1 12/12 On-Site Disposal Facility Inspection Report December 2012 6319D-6137 8929.2 12/12 East Face Cell 1 West Face Cell 1 6319D-6112 6319D-6135 8929.3 12/12 North Face Cell 1 North Drainage (looking west) 6319D-6110 6319D-6109 8929.4 12/12 East Face Cell 2 West Face Cell 2 6319D-6034 6319D-6113 8929.5 12/12 East Face Cell 3 West Face Cell 3 6319D-6133 6319D-6114 8929.6 12/12 East Face Cell 4 West Face Cell 4 6319D-6131 6319D-6116 8929.7 12/12 East Face Cell 5 West Face Cell 5 6319D-6130 6319D-6117 8929.8 12/12 East Face Cell 6 6319D-6118 6319D-6129 West Face Cell 6 8929.9 12/12 East Face Cell 7 6319D-6120 6319D-6127 West Face Cell 7 8929.10 12/12 East Face Cell 8 6319D-6121 6319D-6124 West Face Cell 8 8929.11 12/12

95

8744 - OSDF Inspection Report  

Office of Legacy Management (LM)

3.1 03/13 3.1 03/13 On-Site Disposal Facility Inspection Report March 2013 6319D-6168 8933.2 03/13 East Face Cell 1 West Face Cell 1 6319D-6149 6319D-6155 8933.3 03/13 North Face Cell 1 North Drainage (looking west) 6319D-6151 6319D-6152 8933.4 03/13 East Face Cell 2 West Face Cell 2 6319D-6056 6319D-6148 8933.5 03/13 East Face Cell 3 West Face Cell 3 6319D-6157 6319D-6147 8933.6 03/13 East Face Cell 4 West Face Cell 4 6319D-6158 6319D-6145 8933.7 03/13 East Face Cell 5 West Face Cell 5 6319D-6160 6319D-6144 8933.8 03/13 East Face Cell 6 6319D-6143 6319D-6161 West Face Cell 6 8933.9 03/13 East Face Cell 7 6319D-6141 6319D-6162 West Face Cell 7 8933.10 03/13 East Face Cell 8 6319D-6140 6319D-6164 West Face Cell 8 8933.11 03/13

96

Inspect and Repair Steam Traps  

SciTech Connect

This revised ITP tip sheet on inspecting and repairing steam traps provide how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

Not Available

2006-01-01T23:59:59.000Z

97

Proceedings: EPRI Second Phased Array Inspection Seminar  

Science Conference Proceedings (OSTI)

The Second EPRI Phased Array Inspection Seminar focused on industrial applications of phased array technology that have been achieved to date or are planned for the near future. Presentations were made by developers of inspection techniques, inspection services vendors, and utility personnel who have performed inspections using arrays.

2001-11-28T23:59:59.000Z

98

Acoustic Inspection Devices: Detecting the Undetectable  

Acoustic Inspection Devices: Detecting the Undetectable Emerging homeland security threats and increasingly sophisticated adversaries have heightened ...

99

Proceedings: EPRI Second Phased Array Inspection Seminar  

SciTech Connect

The Second EPRI Phased Array Inspection Seminar focused on industrial applications of phased array technology that have been achieved to date or are planned for the near future. Presentations were made by developers of inspection techniques, inspection services vendors, and utility personnel who have performed inspections using arrays.

None

2001-11-01T23:59:59.000Z

100

Audits & Inspections | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Audits & Inspections Audits & Inspections Audits & Inspections Audits & Inspections The Office of Audits and Inspections provides all internal and contracted audit activities, inspections, and reviews for Department programs and operations, including the National Nuclear Security Administration (NNSA) and the Federal Energy Regulatory Commission (FERC). The Office also performs all OIG intelligence oversight and reporting as required by Executive Order and statue. The Office works as an agent for positive change and continuous improvement in the Department's management and program operations; and strives to provide reliable, credible financial and performance information to senior Department management, the Congress and taxpayers. The Office of Audits and Inspections consists of a Headquarters

Note: This page contains sample records for the topic "roadside inspection wri" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

A study of defects on EUV mask using blank inspection, patterned mask inspection, and wafer inspection  

SciTech Connect

The availability of defect-free masks remains one of the key challenges for inserting extreme ultraviolet lithography (EUVL) into high volume manufacturing. yet link data is available for understanding native defects on real masks. In this paper, a full-field EUV mask is fabricated to investigate the printability of various defects on the mask. The printability of defects and identification of their source from mask fabrication to handling were studied using wafer inspection. The printable blank defect density excluding particles and patterns is 0.63 cm{sup 2}. Mask inspection is shown to have better sensitivity than wafer inspection. The sensitivity of wafer inspection must be improved using through-focus analysis and a different wafer stack.

Huh, S.; Ren, L.; Chan, D.; Wurm, S.; Goldberg, K. A.; Mochi, I.; Nakajima, T.; Kishimoto, M.; Ahn, B.; Kang, I.; Park, J.-O.; Cho, K.; Han, S.-I.; Laursen, T.

2010-03-12T23:59:59.000Z

102

Inspection Report: IG-0530 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 Inspection Report: IG-0530 November 9, 2001 Inspection of the Management of Personal Property at the Ashtabula Environmental Management Project The Office of Inspector General (OIG), U.S. Department of Energy, conducted an inspection to review the management of accountable Government-owned personal property at the Department's Ashtabula Environmental Management Project (Ashtabula) in Ashtabula, Ohio. Earthline Technologies (Earthline), formerly RMI Environmental Services, is the Department's environmental restoration contractor at Ashtabula. Earthline is a division of RMI Titanium Company headquartered in Niles, Ohio. Inspection Report: IG-0530 More Documents & Publications Audit Report: IG-0541 Inspection Report: INS-L-01-05 Inspection Report: IG-0576

103

Independent Oversight Inspection, Lawrence Livermore National Laboratory -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Inspection, Lawrence Livermore National Inspection, Lawrence Livermore National Laboratory - May 2007 Independent Oversight Inspection, Lawrence Livermore National Laboratory - May 2007 May 2007 Inspection of Environment, Safety, and Health Programs at the Lawrence Livermore National Laboratory The U.S. Department of Energy (DOE) Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), conducted an inspection of environment, safety, and health (ES&H) programs at the DOE Lawrence Livermore National Laboratory (LLNL) during January and February 2007. The inspection was performed by Independent Oversight's Office of Environment, Safety and Health Evaluations. LSO's oversight has matured, and operational awareness and assessments have improved in gathering data and identifying deficiencies. LSO

104

Independent Oversight Inspection, Argonne National Laboratory - East,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Oversight Inspection, Argonne National Laboratory - Independent Oversight Inspection, Argonne National Laboratory - East, Summary Report - May 2002 Independent Oversight Inspection, Argonne National Laboratory - East, Summary Report - May 2002 May 2002 Inspection of Environment, Safety, and Health and Emergency Management at the Argonne National Laboratory - East The Secretary of Energy's Office of Independent Oversight and Performance Assurance (OA) conducted an inspection of environment, safety, and health (ES&H) programs and emergency management programs at the Department of Energy's (DOE) Argonne National Laboratory (ANL) in April and May 2002. The inspection was performed as a joint effort by the OA Office of Environment, Safety and Health Evaluations and the Office of Emergency Management Oversight.

105

Inspection Report: IG-0660 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

60 60 Inspection Report: IG-0660 August 30, 2004 Inspection Report on "Internal Controls Over the Accountability of Computers at Sandia National Laboratory, New Mexico The Office of Inspector General initiated an inspection to determine the adequacy of internal controls over the extensive inventory of laptop and desktop computers at Sandia National Laboratory, New Mexico. Computers are used in the full range of operations at Sandia, to include processing classified information. Department of Energy (DOE) and Sandia property policies identify computers as "sensitive property," due largely to their susceptibility to theft and misappropriation. Inspection Report: IG-0660 More Documents & Publications Inspection Report: IG-0597 Inspection Report: IG-0455

106

Ultrasonic Guided Wave Inspection of Tubing: Volume 2: Theoretical Basis for Ultrasonic Guided Waves as a Tube Inspection Tool  

Science Conference Proceedings (OSTI)

By reducing inspection time and providing the sensitivity necessary to ensure a reliable inspection, ultrasonic guided wave technology has the potential to reduce steam generator inspection costs considerably.

1997-07-17T23:59:59.000Z

107

BUILDING INSPECTION Building, Infrastructure, Transportation  

E-Print Network (OSTI)

BUILDING INSPECTION Building, Infrastructure, Transportation City of Redwood City 1017 Middlefield Sacramento, Ca 95814-5514 Re: Green Building Ordinance and the Building Energy Efficiency Standards Per of Redwood City enforce the current Title 24 Building Energy Efficiency Standards as part

108

Robotic Welding and Inspection System  

SciTech Connect

This paper presents a robotic system for GTA welding of lids on cylindrical vessels. The system consists of an articulated robot arm, a rotating positioner, end effectors for welding, grinding, ultrasonic and eddy current inspection. Features include weld viewing cameras, modular software, and text-based procedural files for process and motion trajectories.

H. B. Smartt; D. P. Pace; E. D. Larsen; T. R. McJunkin; C. I. Nichol; D. E. Clark; K. L. Skinner; M. L. Clark; T. G. Kaser; C. R. Tolle

2008-06-01T23:59:59.000Z

109

Industrial Use of Infrared Inspections  

E-Print Network (OSTI)

Infrared is and has been an established technology in the military and aerospace fields. However, only relatively recently has this technology found a "use" in the industrial sector. Many reasons exist why the technology has not been used, but in the final analysis it comes down to the fact that the industrial management responsible for the operations and production budgets did not, and in many cases, still does not understand the economic benefits to the company that infrared industrial inspections can bring about. Over the last 2-3 years a number of articles have appeared in various industrial publications concerning infrared surveys. However, all of the articles have dealt with the technical aspects of infrared inspections, with the economics either completely neglected or mentioned only in passing. I believe that in the real industrial world it is the economic benefits of a technology that allow the product of that technology to reach the market and become a success, and not the fact that a technology is useful per se. In this presentation, I shall be focusing primarily on the major economic aspects of the surveys and what the end results really represent in terms of economic benefits. Once the economic benefits of these inspections are clearly understood, it will be readily apparent why the industrial use of these inspections is developing rapidly.

Duch, A. A.

1979-01-01T23:59:59.000Z

110

Piping inspection carriage having axially displaceable sensor  

DOE Patents (OSTI)

A pipe inspection instrument carriage is described for use with a pipe crawler for performing internal inspections of piping surfaces. The carriage has a front leg assembly, a rear leg assembly and a central support connecting the two assemblies and for mounting an instrument arm having inspection instruments. The instrument arm has a Y-arm mounted distally thereon for axially aligning the inspection instrumentation and a mounting block, a linear actuator and axial movement arm for extending the inspection instruments radially outward to operably position the inspection instruments on the piping interior. Also, the carriage has a rotation motor and gear assembly for rotating the central support and the front leg assembly with respect to the rear leg assembly so that the inspection instruments azimuthally scan the piping interior. The instrument carriage allows performance of all piping inspection operations with a minimum of moving parts, thus decreasing the likelihood of performance failure. 4 figures.

Zollinger, W.T.; Treanor, R.C.

1994-12-06T23:59:59.000Z

111

On-Site Disposal Facility Inspection Report  

Office of Legacy Management (LM)

3122013 March 2013 Site Inspection 40 1638 A6B No Large areas of teasel 3122013 March 2013 Site Inspection 52 Herbicide applied August-13 1639 Cell 8, south toe No Rock 312...

112

Inspection Report Follow-up Inspection on Security Clearance Terminations and Badge  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Inspection Report Inspection Report Follow-up Inspection on Security Clearance Terminations and Badge Retrieval at the Lawrence Livermore National Laboratory INS-L-12-02 March 2012 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 March 6, 2012 MEMORANDUM FOR THE ASSOCIATE ADMINISTRATOR FOR DEFENSE NUCLEAR SECURITY MANAGER, LIVERMORE SITE OFFICE FROM: Sandra D. Bruce Assistant Inspector General for Inspections Office of Inspector General SUBJECT: INFORMATION: Inspection Report on "Follow-up Inspection on Security Clearance Terminations and Badge Retrieval at the Lawrence Livermore National Laboratory" BACKGROUND The Department of Energy's Lawrence Livermore National Laboratory (Livermore) is managed

113

Restaurant Hygiene Inspections and Online Reviews  

E-Print Network (OSTI)

Restaurant hygiene inspections are often cited as a success story of public disclosure. Hygiene grades influence customer decisions and serve as an accountability system for restaurants. However, cities (which are responsible for inspections) have limited resources to dispatch inspectors, which in turn limits the number of inspections that can be performed. We argue that NLP can be used to improve the effectiveness of inspections by allowing cities to target restaurants that are most likely to have a hygiene violation. In this work, we report the first empirical study demonstrating the utility of review analysis for predicting restaurant inspection results. 1

Jun Seok Kang; Yejin Choi; Polina Kuznetsova; Michael Luca; Jun Seok; Kang Polina; Kuznetsova Yejin Choi; Michael Luca

2013-01-01T23:59:59.000Z

114

Independent Oversight Inspection, Brookhaven National Laboratory -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 2008 September 2008 Independent Oversight Inspection, Brookhaven National Laboratory - September 2008 September 2008 Inspection of Emergency Management at the Brookhaven Site Office and Brookhaven National Laboratory The U.S. Department of Energy (DOE) Office of Independent Oversight inspected the emergency management program at DOE's Brookhaven National Laboratory (BNL) in June/July 2008. The inspection was performed by Independent Oversight's Office of Emergency Management Oversight (HS-63). This 2008 inspection found that hazardous material inventories remain low, and the program has been significantly improved by the issuance of a hazards survey, EPHAs, and revised emergency plan, as well as other upgraded program plans and procedures. Additionally, the EOC is better

115

Drum inspection robots: Application development  

Science Conference Proceedings (OSTI)

Throughout the Department of Energy (DOE), drums containing mixed and low level stored waste are inspected, as mandated by the Resource Conservation and Recovery Act (RCRA) and other regulations. The inspections are intended to prevent leaks by finding corrosion long before the drums are breached. The DOE Office of Science and Technology (OST) has sponsored efforts towards the development of robotic drum inspectors. This emerging application for mobile and remote sensing has broad applicability for DOE and commercial waste storage areas. Three full scale robot prototypes have been under development, and another project has prototyped a novel technique to analyze robotically collected drum images. In general, the robots consist of a mobile, self-navigating base vehicle, outfitted with sensor packages so that rust and other corrosion cues can be automatically identified. They promise the potential to lower radiation dose and operator effort required, while improving diligence, consistency, and documentation.

Hazen, F.B. [Fernald Environmental Restoration Management Corp., Cincinnati, OH (United States); Warner, R.D. [USDOE, Washington, DC (United States)

1996-02-01T23:59:59.000Z

116

BENCHMARKING EMERGING PIPELINE INSPECTION TECHNOLOGIES  

NLE Websites -- All DOE Office Websites (Extended Search)

Benchmarking Emerging Pipeline Inspection Technologies To Department of Energy National Energy Technology Laboratory (NETL) DE-AP26-04NT40361 and Department of Transportation Research and Special Programs Administration (RSPA) DTRS56-02-T-0002 (Milestone 7) September 2004 Final Report on Benchmarking Emerging Pipeline Inspection Technologies Cofunded by Department of Energy National Energy Technology Laboratory (NETL) DE-AP26-04NT40361 and Department of Transportation Research and Special Programs Administration (RSPA) DTRS56-02-T-0002 (Milestone 7) by Stephanie A. Flamberg and Robert C. Gertler September 2004 BATTELLE 505 King Avenue Columbus, Ohio 43201-2693 Neither Battelle, nor any person acting on their behalf: (1) Makes any warranty or representation, expressed or implied, with respect to the

117

Inspection games in arms control  

E-Print Network (OSTI)

An inspection game is a mathematical model of a situation in which an inspector verifies the adherence of an inspectee to some legal obligation, such as an arms control treaty, where the inspectee may have an interest in violating that obligation. The mathematical analysis seeks to determine an optimal inspection scheme, ideally one which will induce legal behavior, under the assumption that the potential illegal action is carried out strategically; thus a non-cooperative game with two players, inspector and inspectee, is defined. Three phases of development in the application of such models to arms control and disarmament may be identified. In the first of these, roughly from 1961 through 1968, studies that focused on inspecting a nuclear test ban treaty emphasized game theory, with less consideration given to statistical aspects associated with data acquisition and measurement uncertainty. The second phase, from 1968 to about 1985, involves work stimulated by the Treaty on the Non-Proliferation of Nuclear Weapons (NPT). Here, the verification principle of material accountancy came to the fore, along with the need to include the formalism of statistical decision theory within the inspection models. The third phase, 1985 to the present, has been dominated by challenges posed by such far-reaching verification agreements as the Intermediate Range Nuclear Forces Agreement (1NF), the Treaty on Conventional Forces in Europe (CFE) and the Chemical Weapons Convention (CWC), as well as perceived failures of the NPT system in Iraq and North Korea. In this connection, the interface between the political and technical aspects of verification is being examined from the game-theoretic viewpoint.

Rudolf Avenhaus; Morton Canty; D. Marc Kilgour; Bernhard Von Stengel; Shmuel Zamir

1996-01-01T23:59:59.000Z

118

Apparatus for inspecting fuel elements  

SciTech Connect

Disclosed is an alpha monitor usable in an automated nuclear fuel pin loading and processing unit. Fuel pins or other elongated pins are fed laterally into the alpha monitor in a singular fashion and are translated by a first roller assembly into a weld flare machining and decontamination substation not forming a part of the invention. Pins return and are lifted upwardly and transferred across to a combined pin lifting and electrode operating means which lifts the pins upwardly into a clamshell electrode assembly which is spread open by a combined pin lifting and electrode operating means. Once inserted the clamshell type electrode arrangement closes around the fuel pins so that inspection can occur. Fuel pins are inspected by charging electrodes to a negative potential and measuring the change in charge occurring when positively charged alpha particles strike the negatively charged electrodes. After inspection, the fuel pins are lowered by the pin lifting and electrode operating means into a second roller assembly which longitudinally conveys approved pins from the airtight enclosure in which the alpha monitor is mounted. If the fuel pins are rejected then they are moved laterally by a second transfer means and onto another system for further processing.

Oakley, David J. (Richland, WA); Groves, Oliver J. (Seattle, WA); Kaiser, Bruce J. (Wilmington, NC)

1986-01-01T23:59:59.000Z

119

Apparatus for inspecting fuel elements  

DOE Patents (OSTI)

This disclosure describes an alpha monitor usable in an automated nuclear fuel pin loading and processing unit. Fuel pins or other elongated pins are fed laterally into the alpha monitor in a singular fashion and are translated by a first roller assembly into a weld flare machining and decontamination substation not forming a part of the invention. Pins return and are lifted upwardly and transferred across to a combined pin lifting and electrode operating means which lifts the pins upwardly into a clamshell electrode assembly which is spread open by a combined pin lifting and electrode operating means. Once inserted the clamshell type electrode arrangement closes around the fuel pins so that inspection can occur. Fuel pins are inspected by charging electrodes to a negative potential and measuring the change in charge occurring when positively charged alpha particles strike the negatively charged electrodes. After inspection, the fuel pins are lowered by the pin lifting and electrode operating means into a second roller assembly which longitudinally conveys approved pins from the airtight enclosure in which the alpha monitor is mounted. If the fuel pins are rejected then they are moved laterally by a second transfer means and onto another system for further processing.

Kaiser, B.J.; Oakley, D.J.; Groves, O.J.

1984-12-21T23:59:59.000Z

120

ANNUAL RADIOACTIVE WASTE TANK INSPECTION PROGRAM - 2011  

SciTech Connect

Aqueous radioactive wastes from Savannah River Site (SRS) separations and vitrification processes are contained in large underground carbon steel tanks. Inspections made during 2011 to evaluate these vessels and other waste handling facilities along with evaluations based on data from previous inspections are the subject of this report. The 2011 inspection program revealed that the structural integrity and waste confinement capability of the Savannah River Site waste tanks were maintained. All inspections scheduled per SRR-LWE-2011-00026, HLW Tank Farm Inspection Plan for 2011, were completed. Ultrasonic measurements (UT) performed in 2011 met the requirements of C-ESR-G-00006, In-Service Inspection Program for High Level Waste Tanks, Rev. 3, and WSRC-TR-2002-00061, Rev.6. UT inspections were performed on Tanks 25, 26 and 34 and the findings are documented in SRNL-STI-2011-00495, Tank Inspection NDE Results for Fiscal Year 2011, Waste Tanks 25, 26, 34 and 41. A total of 5813 photographs were made and 835 visual and video inspections were performed during 2011. A potential leaksite was discovered at Tank 4 during routine annual inspections performed in 2011. The new crack, which is above the allowable fill level, resulted in no release to the environment or tank annulus. The location of the crack is documented in C-ESR-G-00003, SRS High Level Waste Tank Leaksite Information, Rev.6.

West, B.; Waltz, R.

2012-06-21T23:59:59.000Z

Note: This page contains sample records for the topic "roadside inspection wri" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Independent Oversight Inspection, Lawrence Livermore National Laboratory,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Inspection, Lawrence Livermore National Inspection, Lawrence Livermore National Laboratory, Volume I - December 2004 Independent Oversight Inspection, Lawrence Livermore National Laboratory, Volume I - December 2004 December 2004 Inspection of Environment, Safety, and Health Management at the Lawrence Livermore National Laboratory The U.S. Department of Energy (DOE) Office of Independent Oversight and Performance Assurance (OA), within the Office of Security and Safety Performance Assurance (SSA), conducted an inspection of environment, safety, and health (ES&H) at the DOE Lawrence Livermore National Laboratory (LLNL) during October and November 2004. The inspection was performed by the OA Office of Environment, Safety and Health Evaluations. LSO and LLNL have established ISM systems that are conceptually sound but

122

Independent Oversight Inspection, Lawrence Livermore National Laboratory -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lawrence Livermore National Lawrence Livermore National Laboratory - February 2009 Independent Oversight Inspection, Lawrence Livermore National Laboratory - February 2009 February 2009 Inspection of Emergency Management at the Livermore Site Office and Lawrence Livermore National Laboratory The U.S. Department of Energy (DOE) Office of Independent Oversight inspected the emergency management program at DOE's Lawrence Livermore National Laboratory (LLNL) in October/November 2008. The inspection was performed by Independent Oversight's Office of Emergency Management Oversight. This 2008 inspection found that overall, the LLNL emergency management program is, with a few exceptions, well defined and better implemented in most areas than observed during previous inspections, but some implementation weaknesses remain that diminish the ability of the program

123

Independent Oversight Inspection, Pacific Northwest National Laboratory -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Oversight Inspection, Pacific Northwest National Independent Oversight Inspection, Pacific Northwest National Laboratory - December 2003 Independent Oversight Inspection, Pacific Northwest National Laboratory - December 2003 December 2003 Inspection of Environment, Safety, and Health Management at the Pacific Northwest National Laboratory The Secretary of Energy's Office of Independent Oversight and Performance Assurance (OA) conducted an inspection of environment, safety, and health (ES&H) at the U.S. Department of Energy (DOE) Pacific Northwest National Laboratory (PNNL) during November and December 2003. The inspection was performed by the OA Office of Environment, Safety and Health Evaluations. Overall, implementation of ISM at PNNL has improved noticeably since the 1998 DOE Headquarters independent oversight evaluation. This improvement is

124

Underground Transmission Vault Inspection Using Robotic Techniques  

Science Conference Proceedings (OSTI)

Underground power lines require inspection and maintenance to ensure long-term performance and reliable operation. In addition to terminations at both ends of the underground lines, access to the lines for inspection and maintenance is obtained through underground vaults or manholes. General practices require utility personnel to enter the vaults for visual inspection and to make the necessary measurements using portable instruments.The Electric Power Research Institute has developed the ...

2013-11-22T23:59:59.000Z

125

Independent Oversight Inspection, Brookhaven National Laboratory - November  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 2007 November 2007 Independent Oversight Inspection, Brookhaven National Laboratory - November 2007 November 2007 Inspection of Environment, Safety, and Health Programs at the Brookhaven National Laboratory The U.S. Department of Energy (DOE) Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), inspected environment, safety, and health (ES&H) programs at the DOE Brookhaven Site Office (BHSO) and Brookhaven National Laboratory (BNL) during August and September 2007. The ES&H inspection was performed by Independent Oversight's Office of Environment, Safety and Health Evaluations. BHSO has established mechanisms to gather performance data and provide feedback to laboratory management, which is resulting in improvements

126

Inspection Report: IG-0821 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Inspection Report: IG-0821 Inspection Report: IG-0821 Inspection Report: IG-0821 September 11, 2009 Fire Suppression and Related Services at Los Alamos National Laboratory The Department of Energy's (DOE's) Los Alamos National Laboratory (LANL) is a multidisciplinary research institution engaged in strategic science on behalf of national security. LANL operates in "unique" hazard environments, to include special nuclear materials, explosives, and hazardous chemicals, that create special fire suppression and emergency management challenges. To address these challenges, LANL must have a comprehensive approach to the protection of personnel, facilities, physical assets, and programmatic activities from fire and related dangers. Topic: National Security and Safety Inspection Report: IG-0821

127

Inspection Report: IG-0488 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 Inspection Report: IG-0488 November 20, 2000 Inspection of Selected Aspects of the Department of Energy's Classified Document Transmittal Process In view of recent concerns regarding the security of Department of Energy (DOE) classified information, including nuclear weapons information, we initiated an inspection to determine whether officials of the Department and its contractors, including officials of the National Nuclear Security Administration (NNSA) and its contractors, followed the Department's policies and procedures when transmitting classified documents to entities outside the Department. Inspection Report: IG-0488 More Documents & Publications Semiannual Report to Congress: October 1, 2000 - March 31, 2001 Special Report: IG-0538 Safety and Security Enforcement Process Overview

128

Independent Oversight Inspection, Lawrence Berkeley National Laboratory -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Berkeley National Berkeley National Laboratory - April 2009 Independent Oversight Inspection, Lawrence Berkeley National Laboratory - April 2009 April 2009 Inspection of Environment, Safety, and Health Programs at the Lawrence Berkeley National Laboratory The U.S. Department of Energy (DOE) Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), inspected environment, safety, and health (ES&H) programs at the DOE Lawrence Berkeley National Laboratory (LBNL) during January through February 2009. The inspection was performed by the Office of Independent Oversight's Office of Environment, Safety and Health Evaluations. The contractor assurance system has been improved and is identifying deficiencies and improving LBNL ES&H processes and performance. LBNL has

129

Enduring Stockpile CMM Shell Inspection Plan (U)  

SciTech Connect

The slides are intended to serve as a high level summary of the CMM Shell Inspection Plan as presented to Pu Sustainment Legacy Pit Production IPT.

Montano, Joshua D. [Los Alamos National Laboratory; Flores, Randy A. [Los Alamos National Laboratory

2012-06-13T23:59:59.000Z

130

Occupational Radiation Protection Program Inspection Criteria...  

NLE Websites -- All DOE Office Websites (Extended Search)

Inspection Criteria, Approach, and Lines of Inqu v Acting Di ector, Off'ke.-of Safety and Emergency Management Evaluations Date: '; 4 I &.- WJ Criteria Lead,...

131

Independent Oversight Inspection of Environment, Safety, and...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Oversight Inspection of Environment, Safety, and Health Programs at the Savannah River Operations Office and Savannah River Site, January 2010 Independent Oversight...

132

Inspection Report: IG-0478 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

on the Review of Scientific Integrity Issues at Lawrence Berkeley National Laboratory The Office of Inspector General initiated an inspection into issues relating to allegations of...

133

Inspection Report: IG-0604 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Office Management of Emergency Response and Law Enforcement-Related Grants The Office of Inspector General (OIG) conducted an inspection of select grants funded by the...

134

Independent Oversight Inspection, Idaho National Laboratory ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Energy (DOE) Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), inspected the emergency management program at DOE's Idaho Operations...

135

Inspection Report: IG-0531 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

over DOE Headquarters and field site computer networks. Inspection Report: IG-0531 More Documents & Publications Audit Report: IG-0568 Audit Report: IG-0617 Audit Report: IG-0631...

136

Hazardous Waste Management Implementation Inspection Criteria...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to the Director of the Office of ES&H Evaluations on (301) 903-5392. Subject: Hazardous Waste Management Inplementation Inspection Criteria, Approach, Evaluations Management Date:...

137

Radiation Inspection System Lab (RISL) | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

Radiation Inspection System Lab May 30, 2013 This team has the background and experience to test and optimize radiation detection systems from handheld background survey meters to...

138

Occupational Radiation Protection Program Inspection Criteria...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Evaluations Criteria Review and Approach Document 1.0 PURPOSE Subject: Occupational Radiation Protection Program Inspection Criteria, Approach, and Lines of Inqu v Acting Di...

139

Environmental Radiation Protection, Inspection Criteria, Approach...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

is approved for use by the Office of ES&H Evaluations. Subject: Environmental Radiation Protection, Inspection Criteria, Approach, and Lines of Inquiry Director, ffice of...

140

Independent Oversight Inspection of Environment, Safety, and...  

NLE Websites -- All DOE Office Websites (Extended Search)

functions of safety management for various work activities. The OA inspection team used a selective sampling approach to determine the effectiveness of NV and NTS in implementing...

Note: This page contains sample records for the topic "roadside inspection wri" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Electrical Equipment Inventory and Inspection Information  

NLE Websites -- All DOE Office Websites (Extended Search)

Electrical Equipment Inventory and Inspection Information APS Non-NRTL Electrical Equipment Inventory Spreadsheet ANL Recognized Reputable Electrical Equipment Manufacturer List as...

142

Inspection Report: IG-0621 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

are considered sensitive items by DOE and are subject to strict inventory controls. The Office of Inspector General (OIG) initiated an inspection of internal controls over...

143

Inspection Report: IG-0757 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 Inspection Report: IG-0757 February 16, 2007 Excessing of Computers Used for Unclassified Controlled Information at the Idaho National Laboratory In support of its mission, the...

144

Optimal Inspection First and Last Policies for a Computer System  

Science Conference Proceedings (OSTI)

When a computer system executes successive jobs and processes with random time intervals, it would be impossible or impractical to make some inspections to check faults that occur intermittently in a strict periodic fashion. From such a viewpoint, by ... Keywords: periodic inspection, random inspection, inspection first, inspection last, checking time

Xufeng Zhao; Syouji Nakamura; Toshio Nakagawa

2012-11-01T23:59:59.000Z

145

Annual Radioactive Waste Tank Inspection Program - 2000  

SciTech Connect

Aqueous radioactive wastes from Savannah River Site (SRS) separations and vitrification processes are contained in large underground carbon steel tanks. Inspections made during 2000 to evaluate these vessels and other waste handling facilities along with evaluations based on data from previous inspections are the subject of this report.

West, W.R.

2001-04-17T23:59:59.000Z

146

Hoisting and Rigging: Inspection and Maintenance Requirements  

E-Print Network (OSTI)

Devices, Slings, and Rigging Hardware and Accessories (SLAC-I-730-0A21S-036) Hoisting and Rigging: PreHoisting and Rigging: Inspection and Maintenance Requirements URL: http://www-group.slac.stanford.edu/esh/eshmanual/references/hoisting Department: Field Safety and Building Inspection Program: Hoisting and Rigging Authority: ESH Manual, Chapter

Wechsler, Risa H.

147

ANNUAL RADIOACTIVE WASTE TANK INSPECTION PROGRAM 2008  

SciTech Connect

Aqueous radioactive wastes from Savannah River Site (SRS) separations and vitrification processes are contained in large underground carbon steel tanks. Inspections made during 2008 to evaluate these vessels and other waste handling facilities along with evaluations based on data from previous inspections are the subject of this report.

West, B.; Waltz, R.

2009-06-11T23:59:59.000Z

148

POST 10/Truck Inspection Station (Map 3  

NLE Websites -- All DOE Office Websites (Extended Search)

POST 10/Truck Inspection Station (Map 3) POST 10/Truck Inspection Station (Map 3) Changes Effective January 11, 2010 Pajarito Corridor Deliveries: Drivers of commercial delivery trucks headed to the Pajarito Corridor (Pajarito Road bounded by NM Highway 4 and Diamond Drive) must stop at Post 10 for truck inspections. Drivers will then need to present time-stamped inspection passes from Post 10 to protective force officers stationed at the Pajarito Corridor. (Drivers exiting Post 10 should (1) turn right and proceed west on the Truck Route; (2) turn left onto West Jemez Road; (3) proceed to Lane 7; (4) STOP and present the inspection pass to the protective force officer; (5) turn left onto Diamond

149

Security enhanced with increased vehicle inspections  

NLE Websites -- All DOE Office Websites (Extended Search)

Security enhanced with increased vehicle inspections Security enhanced with increased vehicle inspections Security measures increase as of March: vehicle inspections won't delay traffic New increased security procedures meet LANL's security objectives while minimizing impacts on local businesses and tourists. March 23, 2012 The most prominent change is the increase of random inspections of all vehicles transiting the Laboratory, to include West and East Jemez Roads and roadways leading to the main Laboratory administrative area, Technical Area 3 Expect random inspections of all vehicles transiting the Laboratory, to include West and East Jemez Roads and roadways leading to the main Laboratory administrative area, Technical Area 3. Contact Kevin Roark Communications Office (505) 665-9202 Email "We're doing our best to meet our security objectives while minimizing

150

Inspection Report: IG-0547 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Inspection Report: IG-0547 Inspection Report: IG-0547 Inspection Report: IG-0547 March 22, 2002 Licensing of Trade Secrets by Sandia National Laboratories The Office of Inspector General (OIG), U.S. Department of Energy (DOE), initiated an inspection into the facts and circumstances surrounding the issuance of a trade secret license in June 2000 by Sandia National Laboratories (Sandia) at Livermore, California, to Axsun Technologies (Axsun), a private company. This inspection was initiated after the OIG received allegations that the issuance of the Axsun license was in violation of both DOE policy and the requirements of Sandia's management and operating contract. It was alleged that Sandia had been advised for many years that DOE policy prohibited the national laboratories from creating, maintaining or marketing trade secrets. The allegation suggested

151

Independent Oversight Inspection, Lawrence Livermore National Laboratory -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lawrence Livermore National Lawrence Livermore National Laboratory - June 2005 Independent Oversight Inspection, Lawrence Livermore National Laboratory - June 2005 June 2005 Inspection of Emergency Management at the Livermore Site Office and Lawrence Livermore National Laboratory The Secretary of Energy's Office of Independent Oversight and Performance Assurance (OA), within the Office of Security and Safety Performance Assurance, conducted an inspection of the emergency management program at the U.S. Department of Energy (DOE) Lawrence Livermore National Laboratory (LLNL) site in June 2005. The inspection was performed by the OA Office of Emergency Management Oversight. This 2005 OA inspection determined that LLNL has completed program development work or has established an appropriate framework for nearly all

152

Inspection Report: IG-0531 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Inspection Report: IG-0531 Inspection Report: IG-0531 Inspection Report: IG-0531 November 13, 2001 Inspection of Cyber Security Standards for Sensitive Personal Information The Office of Inspector General (OIG), U.S. Department of Energy (DOE), identified a concern relating to the cyber security of unclassified sensitive personal information maintained by the Department under the Privacy Act of 1974, and other personal information exempt from disclosure under the Freedom of Information Act (Privacy Act/FOIA personal information). Specifically, the concern related to possible compromise of this type of information on or over DOE Headquarters and field site computer networks. Inspection Report: IG-0531 More Documents & Publications Audit Report: IG-0568 Audit Report: IG-0617 Audit Report: IG-0572

153

Inspection/Sampling Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Inspection/Sampling Schedule Inspection/Sampling Schedule Inspection/Sampling Schedule Site Inspection and Water Sampling Schedules Note: The following schedules are subject to change without prior notice and will be updated periodically. Site Name Inspection Date Sampling Week Ambrosia Lake, NM, Disposal Site August 18, 2014 November 20, 2013 Bluewater, NM, Disposal Site August 18, 2014 November 20, 2013 January 28, 2014 May 12, 2014 Boiling Nuclear Superheater (BONUS), PR, Decommissioned Reactor Site Next event 2017 Burrell, PA, Disposal Site December 9, 2013 November 20, 2013 Canonsburg, PA, Disposal Site December 9, 2013 November 19, 2013 Durango, CO, Disposal Site May 19, 2014 June 2, 2014 Durango, CO, Processing Site N/A June 2, 2014 September 1, 2014 Edgemont, SD, Disposal Site June 23, 2014 N/A

154

Remote field eddy current inspection  

SciTech Connect

The Remote Field Eddy Current (RFEC) technique uses an internal probe to inspect conducting tubes nondestructively. A coaxial solenoidal exciter, energized with low frequency AC, and detector coils near the inside of the pipe wall are separated by about two pipe diameters to obtain through wall transmission and equal sensitivity to defects on the outside or inside of the pipe wall. Calculation methods are outlined and the voltage plane polar plot signal representation for defect measurement is described. Slit defect interactions in ferromagnetic and non-ferromagnetic tubes are discussed. Defect-induced anomalous fields are interpreted in terms of anomalous source eddy current and missing magnetization defect models. The use of computer animations to represent the time variations of high resolution field measurements and calculations is described.

Atherton, D.L. [Queen`s Univ., Kingston, Ontario (Canada). Dept. of Physics

1995-11-01T23:59:59.000Z

155

Cooling Tower Inspection with Scuba  

E-Print Network (OSTI)

A serious problem of scale and other solid material settling in heat transfer equipment was threatening to shut down our ethylene plant. All evidence pointed to the cooling tower as the source of the contamination. Visual inspection of the cooling tower pump suction basin was accomplished by diving into the basin using SCUBA gear. It was possible to see a build-up of debris on the pump suction basket strainers and on the floor of the sumps. Also, it was discovered that one of the four baskets had been installed incorrectly. Photographs of the basket strainers were taken to aid in describing their exact condition. With the aid of SCUBA it was possible to sufficiently clean the pump sumps so that costly downtime was avoided. Likewise, using this technique, steps were taken to greatly reduce the chance for further contamination of the circulating cooling water system.

Brenner, W.

1982-01-01T23:59:59.000Z

156

Uranium at Y-12: Inspection | Y-12 National Security Complex  

NLE Websites -- All DOE Office Websites (Extended Search)

Inspection Uranium at Y-12: Inspection Posted: July 22, 2013 - 3:36pm | Y-12 Report | Volume 10, Issue 1 | 2013 Inspection of enriched uranium is performed by dimensional checks...

157

Appendix B Landfill Inspection Forms and Survey Data  

Office of Legacy Management (LM)

Appendix B Landfill Inspection Forms and Survey Data This page intentionally left blank This page intentionally left blank Original Landfill January 2011 Monthly Inspection -...

158

Independent Oversight Inspection of Emergency Management at the...  

NLE Websites -- All DOE Office Websites (Extended Search)

of Energy October 2002 Volume II INDEPENDENT OVERSIGHT INSPECTION OF EMERGENCY MANAGEMENT AT THE NEVADA TEST SITE VOLUME II October 2002 i INDEPENDENT OVERSIGHT INSPECTION OF...

159

Inspection Report on "Protective Force Performance Test Improprieties...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Other Agencies You are here Home Inspection Report on "Protective Force Performance Test Improprieties," DOEIG-0636 Inspection Report on "Protective Force Performance Test...

160

Development of an Inspection Platform and a Suite of Sensors...  

NLE Websites -- All DOE Office Websites (Extended Search)

for conventional pigs. * Inspection cost lower (mile) than direct assessment or hydro testing. * A more versatile platform capable of performing a variety of inspection...

Note: This page contains sample records for the topic "roadside inspection wri" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

December 4, 2007: NETL's Robotic Pipeline Inspection Tool  

Energy.gov (U.S. Department of Energy (DOE))

December 4, 2007The Department's National Energy Technology Laboratory announces the development of a new robotic pipeline inspection tool that could revolutionize the pipeline inspection process....

162

North American Standard Level VI Inspection Program Update: Ensuring...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

North American Standard Level VI Inspection Program Update: Ensuring Safe Transportation of Radioactive Material North American Standard Level VI Inspection Program Update:...

163

Independent Oversight Inspection, Y-12 National Security Complex...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 2008 Independent Oversight Inspection, Y-12 National Security Complex - June 2008 June 2008 Inspection of Environment, Safety, and Health Programs at the Y-12 National...

164

Independent Oversight Inspection, Y-12 National Security Complex...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Y-12 National Security Complex - February 2008 Independent Oversight Inspection, Y-12 National Security Complex - February 2008 February 2008 Inspection of Emergency Management at...

165

2010 Inspection and Status Report for the Boiling Nuclear Superheater...  

Office of Legacy Management (LM)

3 Annual Inspection - Boiling Nuclear Superheat (BONUS) Site, Rincn, Puerto Rico October 2013 Page 1 2013 Inspection and Status Report for the Former Boiling Nuclear Superheater...

166

ANNUAL RADIOACTIVE WASTE TANK INSPECTION PROGRAM 2010  

SciTech Connect

Aqueous radioactive wastes from Savannah River Site (SRS) separations and vitrification processes are contained in large underground carbon steel tanks. Inspections made during 2010 to evaluate these vessels and other waste handling facilities along with evaluations based on data from previous inspections are the subject of this report. The 2010 inspection program revealed that the structural integrity and waste confinement capability of the Savannah River Site waste tanks were maintained. All inspections scheduled per SRR-LWE-2009-00138, HLW Tank Farm Inspection Plan for 2010, were completed. Ultrasonic measurements (UT) performed in 2010 met the requirements of C-ESG-00006, In-Service Inspection Program for High Level Waste Tanks, Rev. 3, and WSRC-TR-2002-00061, Rev.6. UT inspections were performed on Tanks 30, 31 and 32 and the findings are documented in SRNL-STI-2010-00533, Tank Inspection NDE Results for Fiscal Year 2010, Waste Tanks 30, 31 and 32. A total of 5824 photographs were made and 1087 visual and video inspections were performed during 2010. Ten new leaksites at Tank 5 were identified in 2010. The locations of these leaksites are documented in C-ESR-G-00003, SRS High Level Waste Tank Leaksite Information, Rev.5. Ten leaksites at Tank 5 were documented during tank wall/annulus cleaning activities. None of these new leaksites resulted in a release to the environment. The leaksites were documented during wall cleaning activities and the waste nodules associated with the leaksites were washed away. Previously documented leaksites were reactivated at Tank 12 during waste removal activities.

West, B.; Waltz, R.

2011-06-23T23:59:59.000Z

167

Inspection Report: IG-0628 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

8 8 Inspection Report: IG-0628 December 5, 2003 Internal Controls Over Classified Computers and Classified Removable Media at the Lawrence Livermore National Laboratory Computers are used extensively in the full range of operations at Lawrence Livermore National Laboratory (Livermore), including processing classified national security information. Livermore reported an inventory of 86 classified laptop computers and 1,141 classified desktop computers as of March 2003. In addition, Livermore reported approximately 15,000 pieces of classified removable media. Department of Energy (DOE) policy requires strict inventory controls over classified computers and classified removable media. Inspection Report: IG-0628 More Documents & Publications Inspection Report: IG-0716

168

Inspection Report: IG-0594 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Inspection Report: IG-0594 Inspection Report: IG-0594 Inspection Report: IG-0594 March 31, 2003 Emergency Medical Coordination Memorandum of Agreement at Brookhaven National Laboratory Because of possible exposure to radioactive and hazardous materials and the potential for industrial accidents at Department of Energy (DOE) sites, the Department has established formalized agreements with local emergency medical providers. These arrangements are generally documented through memoranda of agreements (MOAs). These documents detail the mutual understanding between DOE and the offsite emergency medical provider with respect to capabilities, specific support, and procedures for ensuring an integrated and effective response, including specific procedures for receipt of victims of radiation accidents.

169

Independent Oversight Inspection, Portsmouth Gaseous Diffusion Plant -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Portsmouth Gaseous Diffusion Portsmouth Gaseous Diffusion Plant - November 2006 Independent Oversight Inspection, Portsmouth Gaseous Diffusion Plant - November 2006 November 2006 Inspection of Emergency Management at the Portsmouth Gaseous Diffusion Plant The Secretary of Energy's Office of Independent Oversight, within the Office of Security and Safety Performance Assurance, conducted an inspection of the emergency management program at the Portsmouth Gaseous Diffusion Plant (PORTS) in August and September 2006. The coordination of emergency plans and procedures among USEC and DOE contractor organizations has successfully integrated the emergency management programs into a single cohesive program for the PORTS site. Other strengths include accurate hazards surveys that identify applicable

170

Independent Oversight Inspection, Hanford Site - September 2006 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hanford Site - September 2006 Hanford Site - September 2006 Independent Oversight Inspection, Hanford Site - September 2006 September 2006 Inspection of Environment, Safety, and Health and Emergency Management Programs at the Hanford Site Waste Stabilization and Disposition Project The U.S. Department of Energy (DOE) Office of Independent Oversight, within the Office of Security and Safety Performance Assurance, conducted an inspection of environment, safety, and health (ES&H) programs at the DOE Hanford Site Waste Stabilization and Disposition Project (WSD) during August and September 2006. The inspection was performed by Independent Oversight's Office of Environment, Safety and Health Evaluations. EM senior managers demonstrated that they clearly understand their safety management roles and responsibilities, and are engaged in making safety

171

Independent Oversight Inspection, Brookhaven National Laboratory - April  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Brookhaven National Laboratory - Brookhaven National Laboratory - April 2004 Independent Oversight Inspection, Brookhaven National Laboratory - April 2004 April 2004 Inspection of Emergency Management at the Brookhaven National Laboratory The Secretary of Energy's Office of Independent Oversight and Performance Assurance (OA), within the newly created Office of Security and Safety Performance Assurance, conducted an inspection of the emergency management program at the U.S. Department of Energy (DOE) Brookhaven National Laboratory (BNL) in March 2004. The inspection was performed by the OA Office of Emergency Management Oversight. A number of positive attributes were identified during this review. Most significant is the aggressive program for reducing hazardous material inventories, minimizing hazardous waste, and evaluating chemical use to

172

Independent Oversight Inspection, Stanford Linear Accelerator Center -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Stanford Linear Accelerator Stanford Linear Accelerator Center - January 2007 Independent Oversight Inspection, Stanford Linear Accelerator Center - January 2007 January 2007 Inspection of Environment, Safety, and Health Programs at the Stanford Linear Accelerator Center The U.S. Department of Energy (DOE) Office of Independent Oversight, within the Office of Health, Safety and Security, conducted an inspection of environment, safety, and health (ES&H) programs at the DOE Stanford Linear Accelerator Center (SLAC) during October and November 2006. The inspection was performed by Independent Oversight's Office of Environment, Safety and Health Evaluations. Since the 2004 Type A electrical accident, SSO and SLAC have made improvements in many aspects of ES&H programs. However, the deficiencies in

173

Inspection Report: IG-0533 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Inspection Report: IG-0533 Inspection Report: IG-0533 Inspection Report: IG-0533 December 7, 2001 Inspection of the Department of Energy's Automated Export Control System The National Defense Authorization Act for Fiscal Year 2000 (NDAA for FY 2000) contained a provision that not later than March 30 of each year the President will submit to Congress, beginning in the year 2000 and ending in the year 2007, an annual report on the Government's policies and procedures with respect to the export of technologies and technical information with potential military applications to countries and entities of concern. Under the Act's provisions, to assist in this process, annual audits in this area are to be conducted by the Inspectors General of the Departments of Energy, Commerce, Defense, and State. An interagency working

174

Inspection Report: IG-0472 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Inspection Report: IG-0472 Inspection Report: IG-0472 Inspection Report: IG-0472 June 1, 2000 Inspection of Surplus Computer Equipment Management at the Savannah River Site By letter dated November 1, 1999, Senator Strom Thurmond advised the Office of Inspector General of an allegation that computer equipment containing over 40 computer hard drives reportedly containing classified or sensitive information were surplused and sold by the Department's Savannah River Site (SRS). The letter raised the concern that the release of this information might pose a threat to the national security of the United States. The management and operating contractor at SRS, Westinghouse Savannah River Company (Westinghouse), is responsible for the final disposal of surplus equipment, including computer hard drives. The purpose

175

Independent Oversight Inspection, Sandia National Laboratories, Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Laboratories, Laboratories, Summary Report - February 2003 Independent Oversight Inspection, Sandia National Laboratories, Summary Report - February 2003 February 2003 Inspection of Environment, Safety, and Health and Emergency Management at the Sandia National Laboratories The Secretary of Energy's Office of Independent Oversight and Performance Assurance (OA) conducted an inspection of environment, safety, and health (ES&H) and emergency management programs at the U.S. Department of Energy's (DOE) Sandia National Laboratories - New Mexico (SNL/NM) site in January-February 2003. The inspection was performed as a joint effort by the OA Office of Environment, Safety and Health Evaluations and the Office of Emergency Management Oversight. As discussed throughout this report, the SNL/NM ISM program has improved,

176

Independent Oversight Inspection, Sandia National Laboratories, Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sandia National Laboratories, Sandia National Laboratories, Summary Report - February 2003 Independent Oversight Inspection, Sandia National Laboratories, Summary Report - February 2003 February 2003 Inspection of Environment, Safety, and Health and Emergency Management at the Sandia National Laboratories The Secretary of Energy's Office of Independent Oversight and Performance Assurance (OA) conducted an inspection of environment, safety, and health (ES&H) and emergency management programs at the U.S. Department of Energy's (DOE) Sandia National Laboratories - New Mexico (SNL/NM) site in January-February 2003. The inspection was performed as a joint effort by the OA Office of Environment, Safety and Health Evaluations and the Office of Emergency Management Oversight. As discussed throughout this report, the SNL/NM ISM program has improved,

177

Independent Oversight Inspection, Thomas Jefferson National Accelerator  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Thomas Jefferson National Thomas Jefferson National Accelerator Facility - August 2008 Independent Oversight Inspection, Thomas Jefferson National Accelerator Facility - August 2008 August 2008 Inspection of Environment, Safety and Health Programs at the Thomas Jefferson National Accelerator Facility The U.S. Department of Energy (DOE) Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), inspected environment, safety, and health (ES&H) programs at the DOE Thomas Jefferson Site Office (TJSO) and the Thomas Jefferson National Accelerator Facility (TJNAF) during May through July 2008. The ES&H inspection was performed by Independent Oversight's Office of Environment, Safety and Health Evaluations. In coordination with TJSO, TJNAF has taken a number of actions to develop a

178

Reliability-based optimization of rail inspection  

E-Print Network (OSTI)

This thesis proposes a quantitative method to optimize inspection/repair intervention in rail defect management. Rail defect management is important for track maintenance, since rails are the most significant and basic ...

Kashima, Takashi, 1971-

2004-01-01T23:59:59.000Z

179

TRANSPORTATION RESEARCH BOARD Testing and Inspection Levels  

E-Print Network (OSTI)

TRANSPORTATION RESEARCH BOARD Testing and Inspection Levels for Hot-Mix Asphaltic Concrete Overlays, Editorial AssistantCHRISTOPHER HEDGES, Senior Program Officer TRANSPORTATION RESEARCH BOARD EXECUTIVE COMMITTEE 2000 OFFICERS Chair: Martin Wachs, Director, Institute of Transportation Studies, University

Sheridan, Jennifer

180

Independent Oversight Inspection, Idaho National Laboratory ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Energy (DOE) Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), inspected environment, safety, and health (ES&H) programs at the DOE Idaho...

Note: This page contains sample records for the topic "roadside inspection wri" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Independent Oversight Inspection, East Tennessee Technology Park...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

programs at the U.S. Department of Energy (DOE) East Tennessee Technology Park (ETTP) site in April and May 2003. The inspection was performed as a joint effort by the OA...

182

Independent Oversight Inspection, Lawrence Livermore National...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

at the U. S. Department of Energy (DOE) Lawrence Livermore National Laboratory (LLNL) in June 2002. The inspection was performed as a joint effort by the OA Office of...

183

Smog Check II Evaluation California Inspection and  

E-Print Network (OSTI)

Smog Check II Evaluation Glossary . . . . . . . . . . . . California Inspection and Maintenance Review Committee #12;Contents Glossary of Acronyms ____________________________________________ 1 Glossary of Terms _______________________________________________ 3 #12;G-1 Glossary of Acronyms APCD Air

Denver, University of

184

Inspection Report: IG-0691 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 Inspection Report: IG-0691 June 14, 2005 Security Access Controls at the Y-12 National Security Complex The Department of Energy's (DOE) Y-12 National Security Complex (Y-12) in...

185

Overhead Transmission Inspection and Assessment Guidelines -- 2011  

Science Conference Proceedings (OSTI)

The emphasis within the transmission arena has shifted from designing and building new transmission facilities to optimizing the use, performance, and life of existing facilities. In the early 1990s, EPRI established an initiative to examine the capabilities and limitations of existing inspection and assessment methods and technology. One of the key needs identified was information on methods and technologies for inspecting/assessing the conditions and life expectancy of overhead transmission line compon...

2011-12-23T23:59:59.000Z

186

Overhead Transmission Inspection and Assessment Guidelines - 2012  

Science Conference Proceedings (OSTI)

The emphasis within the transmission arena has shifted from designing and building new transmission facilities to optimizing the use, performance, and life of existing facilities. In the early 1990s, EPRI established an initiative to examine the capabilities and limitations of existing inspection and assessment methods and technology. One of the key needs identified was information on methods and technologies for inspecting/assessing the conditions and life expectancy of overhead transmission line ...

2012-12-20T23:59:59.000Z

187

Inspection of lithographic mask blanks for defects  

DOE Patents (OSTI)

A visible light method for detecting sub-100 nm size defects on mask blanks used for lithography. By using optical heterodyne techniques, detection of the scattered light can be significantly enhanced as compared to standard intensity detection methods. The invention is useful in the inspection of super-polished surfaces for isolated surface defects or particulate contamination and in the inspection of lithographic mask or reticle blanks for surface defects or bulk defects or for surface particulate contamination.

Sommargren, Gary E. (Santa Cruz, CA)

2001-01-01T23:59:59.000Z

188

Independent Oversight Inspection, Lawrence Livermore National Laboratory- May 2007  

Energy.gov (U.S. Department of Energy (DOE))

Inspection of Environment, Safety, and Health Programs at the Lawrence Livermore National Laboratory

189

Independent Oversight Inspection, Lawrence Livermore National Laboratory- February 2009  

Energy.gov (U.S. Department of Energy (DOE))

Inspection of Emergency Management at the Livermore Site Office and Lawrence Livermore National Laboratory

190

Hierarchical multi-pattern matching algorithm for network content inspection  

Science Conference Proceedings (OSTI)

Inspection engines that can inspect network content for application-layer information are urgently required. In-depth packet inspection engines, which search the whole packet payload, can identify the interested packets that contain certain patterns. ... Keywords: Content inspection, Intrusion detection, Network security, Network-level security and protection, Pattern matching, Real-time and embedded systems

Tzu-Fang Sheu; Nen-Fu Huang; Hsiao-Ping Lee

2008-07-01T23:59:59.000Z

191

ANNUAL RADIOACTIVE WASTE TANK INSPECTION PROGRAM- 2007  

SciTech Connect

Aqueous radioactive wastes from Savannah River Site (SRS) separations and vitrification processes are contained in large underground carbon steel tanks. The 2007 inspection program revealed that the structural integrity and waste confinement capability of the Savannah River Site waste tanks were maintained. A very small amount of material had seeped from Tank 12 from a previously identified leaksite. The material observed had dried on the tank wall and did not reach the annulus floor. A total of 5945 photographs were made and 1221 visual and video inspections were performed during 2007. Additionally, ultrasonic testing was performed on four Waste Tanks (15, 36, 37 and 38) in accordance with approved inspection plans that met the requirements of WSRC-TR-2002- 00061, Revision 2 'In-Service Inspection Program for High Level Waste Tanks'. The Ultrasonic Testing (UT) In-Service Inspections (ISI) are documented in a separate report that is prepared by the ISI programmatic Level III UT Analyst. Tanks 15, 36, 37 and 38 are documented in 'Tank Inspection NDE Results for Fiscal Year 2007'; WSRC-TR-2007-00064.

West, B; Ruel Waltz, R

2008-06-05T23:59:59.000Z

192

NRC LICENSE RENEWAL SCOPING/SCREENING INSPECTION  

E-Print Network (OSTI)

Dear Mr. Nazar: On May 21, 2004, the NRC completed an inspection regarding the application for license renewal for the D. C Cook Nuclear Plant. The enclosed report documents the inspection results, which were discussed with members of your staff. The purpose of this inspection was an examination of activities that support the application for a renewed license for D. C. Cook. The inspection consisted of a selected examination of procedures and representative records, and interviews with personnel regarding the process of scoping and screening plant equipment to select equipment subject to an aging management review. The inspection concluded that the scoping and screening portion of license renewal activities was conducted as described in the License Renewal Application and that documentation supporting the application is in an auditable and retrievable form. With the exception of the items identified in this report, your scoping and screening process was successful in identifying those systems, structures, and components required to be considered for aging management. In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice, " a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at

Cynthia D. Pederson; M. Finissi; Plant Manager; G. White; Michigan Public; Service Commission

2004-01-01T23:59:59.000Z

193

Alternative Fuels Data Center: Natural Gas Vehicle (NGV) Inspection  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Vehicle Vehicle (NGV) Inspection Requirements to someone by E-mail Share Alternative Fuels Data Center: Natural Gas Vehicle (NGV) Inspection Requirements on Facebook Tweet about Alternative Fuels Data Center: Natural Gas Vehicle (NGV) Inspection Requirements on Twitter Bookmark Alternative Fuels Data Center: Natural Gas Vehicle (NGV) Inspection Requirements on Google Bookmark Alternative Fuels Data Center: Natural Gas Vehicle (NGV) Inspection Requirements on Delicious Rank Alternative Fuels Data Center: Natural Gas Vehicle (NGV) Inspection Requirements on Digg Find More places to share Alternative Fuels Data Center: Natural Gas Vehicle (NGV) Inspection Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

194

Waste Calcining Facility remote inspection report  

SciTech Connect

The purpose of the Waste Calcining Facility (WCF) remote inspections was to evaluate areas in the facility which are difficult to access due to high radiation fields. The areas inspected were the ventilation exhaust duct, waste hold cell, adsorber manifold cell, off-gas cell, calciner cell and calciner vessel. The WCF solidified acidic, high-level mixed waste generated during nuclear fuel reprocessing. Solidification was accomplished through high temperature oxidation and evaporation. Since its shutdown in 1981, the WCFs vessels, piping systems, pumps, off-gas blowers and process cells have remained contaminated. Access to the below-grade areas is limited due to contamination and high radiation fields. Each inspection technique was tested with a mock-up in a radiologically clean area before the equipment was taken to the WCF for the actual inspection. During the inspections, essential information was obtained regarding the cleanliness, structural integrity, in-leakage of ground water, indications of process leaks, indications of corrosion, radiation levels and the general condition of the cells and equipment. In general, the cells contain a great deal of dust and debris, as well as hand tools, piping and miscellaneous equipment. Although the building appears to be structurally sound, the paint is peeling to some degree in all of the cells. Cracking and spalling of the concrete walls is evident in every cell, although the east wall of the off-gas cell is the worst. The results of the completed inspections and lessons learned will be used to plan future activities for stabilization and deactivation of the facility. Remote clean-up of loose piping, hand tools, and miscellaneous debris can start immediately while information from the inspections is factored into the conceptual design for deactivating the facility.

Patterson, M.W.; Ison, W.M.

1994-08-01T23:59:59.000Z

195

Feasibility of Magnetostrictive Sensor Inspection of Containments  

SciTech Connect

This report describes the results of a study on the feasibility of using guided waves for long-range global inspection of containment metallic pressure boundaries (i.e., steel containments and liners of reinforced concrete containments) in nuclear power plants. Of particular concern in this study was the potential of the guided-wave approach for remotely inspecting the regions that are inaccessible; for example, regions where the metallic pressure boundary is backed by concrete on one or both sides. The study includes a literature review on long-range guided-wave inspection techniques, a modeling study of the behavior of guided waves in plates with different boundary conditions (e.g., freestanding and backed by concrete on one or both sides), and an experimental investigation of the feasibility of a guided-wave technique called ''magnetostrictive sensor (MsS)'' for (1) generating and detecting guided waves in plates and (2) detecting a defect over a long range. Results of the study showed (1) that it is feasible to achieve long-range global inspection of plates, including regions that are inaccessible, using low-frequency guided waves and (2) that the MsS technique is well suited for this application. Recommendations are made to further test and develop the MsS technique for practical implementation for containment inspection in nuclear power plants.

Kwun, H.

1999-03-01T23:59:59.000Z

196

Remote inspection system for hazardous sites  

SciTech Connect

Long term storage of special nuclear materials poses a number of problems. One of these is a need to inspect the items being stored from time to time. Yet the environment is hostile to man, with significant radiation exposure resulting from prolonged presence in the storage facility. This paper describes research to provide a remote inspection capability, which could lead to eliminating the need for humans to enter a nuclear storage facility. While there are many ways in which an RI system might be created, this paper describes the development of a prototype remote inspection system, which utilizes virtual reality technology along with robotics. The purpose of this system is to allow the operator to establish a safe and realistic telepresence in a remote environment. In addition, it was desired that the user interface for the system be as intuitive to use as possible, thus eliminating the need for extensive training. The goal of this system is to provide a robotic platform with two cameras, which are capable of providing accurate and reliable stereographic images of the remote environment. One application for the system is that it might be driven down the corridors of a nuclear storage facility and utilized to inspect the drums inside, all without the need for physical human presence. Thus, it is not a true virtual reality system providing simulated graphics, but rather an augmented reality system, which performs remote inspection of an existing, real environment.

Redd, J.; Borst, C.; Volz, R.A.; Everett, L.J. [Texas A and M Univ., College Station, TX (United States). Computer Science Dept.] [Texas A and M Univ., College Station, TX (United States). Computer Science Dept.

1999-04-01T23:59:59.000Z

197

Alternative Fuels Data Center: Low-Speed Vehicle Inspection Exemption  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Low-Speed Vehicle Low-Speed Vehicle Inspection Exemption to someone by E-mail Share Alternative Fuels Data Center: Low-Speed Vehicle Inspection Exemption on Facebook Tweet about Alternative Fuels Data Center: Low-Speed Vehicle Inspection Exemption on Twitter Bookmark Alternative Fuels Data Center: Low-Speed Vehicle Inspection Exemption on Google Bookmark Alternative Fuels Data Center: Low-Speed Vehicle Inspection Exemption on Delicious Rank Alternative Fuels Data Center: Low-Speed Vehicle Inspection Exemption on Digg Find More places to share Alternative Fuels Data Center: Low-Speed Vehicle Inspection Exemption on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Low-Speed Vehicle Inspection Exemption Low-speed vehicles are exempt from annual state vehicle inspections.

198

Alternative Fuels Data Center: Alternative Fuel Vehicle Inspection and  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Inspection and Permit to someone by E-mail Inspection and Permit to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel Vehicle Inspection and Permit on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel Vehicle Inspection and Permit on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle Inspection and Permit on Google Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle Inspection and Permit on Delicious Rank Alternative Fuels Data Center: Alternative Fuel Vehicle Inspection and Permit on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel Vehicle Inspection and Permit on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Alternative Fuel Vehicle Inspection and Permit

199

Inspection Report: IG-0480 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

0 0 Inspection Report: IG-0480 September 1, 2000 Inspection of Gain Sharing Opportunities for the Department of Energy In 1995, the General Services Administration provided guidance on a program known as "GAIN SHARING" where agencies could give cash awards to employees who participate in programs to save travel dollars. This guidance discussed the authority to offer cash awards to employees for obtaining a free coach class ticket with Frequent Flyer benefits earned on official travel and for incurring lodging expenses at a daily rate less than the maximum lodging rate. This inspection was initiated to determine if the Department of Energy (DOE) had developed any initiatives to implement General Services Administration guidance on "GAIN SHARING."

200

Inspection Report: IG-0547 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 Inspection Report: IG-0547 March 22, 2002 Licensing of Trade Secrets by Sandia National Laboratories The Office of Inspector General (OIG), U.S. Department of Energy (DOE), initiated an inspection into the facts and circumstances surrounding the issuance of a trade secret license in June 2000 by Sandia National Laboratories (Sandia) at Livermore, California, to Axsun Technologies (Axsun), a private company. This inspection was initiated after the OIG received allegations that the issuance of the Axsun license was in violation of both DOE policy and the requirements of Sandia's management and operating contract. It was alleged that Sandia had been advised for many years that DOE policy prohibited the national laboratories from creating, maintaining or marketing trade secrets. The allegation suggested

Note: This page contains sample records for the topic "roadside inspection wri" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Inspection Report: IG-0597 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 Inspection Report: IG-0597 April 24, 2003 Inspection of Internal Controls Over Personal Computers at Los Alamos National Laboratory Computers are used extensively in the full range of operations at the Los Alamos National Laboratory (LANL), including processing classified national security information. LANL reported an inventory of approximately 5,000 laptop and 30,000 desktop computers at the end of Fiscal Year (FY) 2002. Department of Energy (DOE) and LANL property policies identify computers as "sensitive property," due in part to their susceptibility to theft and potential for conversion to cash. It is an expected practice that management controls over computers throughout the DOE complex remain robust and consistent. Inspection Report: IG-0597

202

Inspection Report: IG-0778 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 Inspection Report: IG-0778 October 2, 2007 Inspection Report on The Consolidated Terrorism Watchlist Nomination Process at the Department of Energy The Government-wide effort to place known or suspected terrorists on a national watchlist is a key weapon in the global war on terrorism. Accurate watchlists provide an import tool for national defense and border protection operations. They allow law enforcement and intelligence personnel to screen and monitor suspected terrorist travel, reducing the likelihood that terrorists may travel undetected to or within the United States. Inspection Report: IG-0778 More Documents & Publications Semiannual Report to Congress: October 1, 2007 - March 31, 2008 Intelligence Reform and Terroroism Prevention Act - December 17, 2004

203

Inspection Report: IG-0741 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Inspection Report: IG-0741 Inspection Report: IG-0741 Inspection Report: IG-0741 October 10, 2006 Concerns With Security Barriers at theY-12 National Security Complex The DOE Office of Inspector General received an allegation that newly constructed concrete security barriers at the Y-12 site were inadequate because the design of the weapon ports did not take into consideration the space required for the weapons' sight system. Specifically, the complaint alleged that weapon port openings were not designed to accommodate the sight system of protective force weapons, limiting the ability of security police officers to maneuver their weapons when firing through the ports. Construction of the security barriers was one of three security upgrades under the "West Fort" project designation. The objective of this

204

Criticality Safety Controls Implementation Inspection Criteria, Approach,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Criticality Safety Controls Implementation Inspection Criteria, Criticality Safety Controls Implementation Inspection Criteria, Approach, and Lines of Inquiry, October 23, 2009, (HSS CRAD 64-18, Rev 0 ) Criticality Safety Controls Implementation Inspection Criteria, Approach, and Lines of Inquiry, October 23, 2009, (HSS CRAD 64-18, Rev 0 ) DOE has set expectations for implementing criticality safety controls that are selected to provide preventive and/or mitigative functions for specific potential accident scenarios. There are additional expectations for criticality safety controls that are also designated as Specific Administrative Controls (SACs) (see HSS CRAD 64-32). Also, in instances when the review addresses functionality and operability of structures, systems, and components (SSCs) of nuclear facilities specifically required

205

H1616 Shipping Container Radiographic Inspection Report  

Science Conference Proceedings (OSTI)

The HI616 shipping container is a certified type B(U) packaging used by the Department of Energy (DOE) to ship tritium in support of defense programs. During the 1997 recertification of the container, DOE became concerned about the possible cracking of the polyurethane foam in the overpacks of the 2300 containers currently in service. In response, Sandia National Laboratories (SNL) initiated a radiographic inspection program to determine if cracking of the foam was occurring in the H1616 overpacks. SNL developed the radiographic technique for inspecting the foam and contracted the Savannah River Site's Tritium Engineering division to inspect a representative sample of overpacks in service. This report details the development process and the results of all of the radiography performed both at SNL and Savannah River.

Tipton, D.G.

1998-11-01T23:59:59.000Z

206

Automated Spot Weld Inspection using Infrared Thermography  

Science Conference Proceedings (OSTI)

An automated non-contact and non-destructive resistance spot weld inspection system based on infrared (IR) thermography was developed for post-weld applications. During inspection, a weld coupon was heated up by an auxiliary induction heating device from one side of the weld, while the resulting thermal waves on the other side were observed by an IR camera. The IR images were analyzed to extract a thermal signature based on normalized heating time, which was then quantitatively correlated to the spot weld nugget size. The use of normalized instead of absolute IR intensity was found to be useful in minimizing the sensitivity to the unknown surface conditions and environment interference. Application of the IR-based inspection system to different advanced high strength steels, thickness gauges and coatings were discussed.

Chen, Jian [ORNL; Zhang, Wei [ORNL; Yu, Zhenzhen [ORNL; Feng, Zhili [ORNL

2012-01-01T23:59:59.000Z

207

Resonant frequency method for bearing ball inspection  

DOE Patents (OSTI)

The present invention provides for an inspection system and method for detecting defects in test objects which includes means for generating expansion inducing energy focused upon the test object at a first location, such expansion being allowed to contract, thereby causing pressure wave within and on the surface of the test object. Such expansion inducing energy may be provided by, for example, a laser beam or ultrasonic energy. At a second location, the amplitudes and phases of the acoustic waves are detected and the resonant frequencies' quality factors are calculated and compared to predetermined quality factor data, such comparison providing information of whether the test object contains a defect. The inspection system and method also includes means for mounting the bearing ball for inspection.

Khuri-Yakub, B. T. (Palo Alto, CA); Hsieh, Chung-Kao (Stanford, CA)

1993-01-01T23:59:59.000Z

208

Resonant frequency method for bearing ball inspection  

DOE Patents (OSTI)

The present invention provides for an inspection system and method for detecting defects in test objects which includes means for generating expansion inducing energy focused upon the test object at a first location, such expansion being allowed to contract, thereby causing pressure wave within and on the surface of the test object. Such expansion inducing energy may be provided by, for example, a laser beam or ultrasonic energy. At a second location, the amplitudes and phases of the acoustic waves are detected and the resonant frequencies' quality factors are calculated and compared to predetermined quality factor data, such comparison providing information of whether the test object contains a defect. The inspection system and method also includes means for mounting the bearing ball for inspection. 5 figures.

Khuri-Yakub, B.T.; Chungkao Hsieh.

1993-11-02T23:59:59.000Z

209

MACS as a tool for international inspections  

SciTech Connect

The MACS/ACRS (Managed Access by Controlled Sensing/Access by Controlled Remote Sensing) system is a collection of communication devices, video capability, and distance-measuring equipment which can effectively substitute for the physical presence of a challenge inspector within a facility. The MACS design allows growth of the prototype, developed in response to the Chemical Weapons Convention (CWC), into a versatile device for inspection of sensitive nuclear facilities under other international arrangements, for example the proposed Fissile Material Cutoff Convention. A MACS/ACRS-type system in a standard, international-recognized configuration could resolve sensitive information and safety concerns through providing a means of achieving the goals of an inspection while excluding the inspector. We believe the technology used to develop MACS for the Defense Nuclear Agency, followed by ACRS for the Department of Energy, is universally adaptable for minimally-intrusive managed-access international inspections of sensitive sites.

Curtiss, J.A.; Indusi, J.P.

1995-08-01T23:59:59.000Z

210

Independent Oversight Inspection, Savannah River Site - February 2006 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February February 2006 Independent Oversight Inspection, Savannah River Site - February 2006 February 2006 Inspection of Emergency Management at the Savannah River Site The U.S. Department of Energy (DOE) Office of Independent Oversight conducted an inspection of environment, safety, and health and emergency management programs at the DOE Savannah River Site (SRS) in January and February 2006. The inspection was performed as a joint effort by Independent Oversight's Office of Environment, Safety and Health Evaluations and Office of Emergency Management Oversight. This 2006 Independent Oversight inspection found that nearly all of the WSRC weaknesses from the 2004 inspection have been addressed. Actions included implementing a comprehensive hazardous material screening process,

211

Multi-level scanning method for defect inspection  

DOE Patents (OSTI)

A method for performing scanned defect inspection of a collection of contiguous areas using a specified false-alarm-rate and capture-rate within an inspection system that has characteristic seek times between inspection locations. The multi-stage method involves setting an increased false-alarm-rate for a first stage of scanning, wherein subsequent stages of scanning inspect only the detected areas of probable defects at lowered values for the false-alarm-rate. For scanning inspection operations wherein the seek time and area uncertainty is favorable, the method can substantially increase inspection throughput.

Bokor, Jeffrey (Oakland, CA); Jeong, Seongtae (Richmond, CA)

2002-01-01T23:59:59.000Z

212

Inspection Report: IG-0594 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 Inspection Report: IG-0594 March 31, 2003 Emergency Medical Coordination Memorandum of Agreement at Brookhaven National Laboratory Because of possible exposure to radioactive and hazardous materials and the potential for industrial accidents at Department of Energy (DOE) sites, the Department has established formalized agreements with local emergency medical providers. These arrangements are generally documented through memoranda of agreements (MOAs). These documents detail the mutual understanding between DOE and the offsite emergency medical provider with respect to capabilities, specific support, and procedures for ensuring an integrated and effective response, including specific procedures for receipt of victims of radiation accidents. Inspection Report: IG-0594

213

Inspection Report: IG-0734 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 Inspection Report: IG-0734 July 26, 2006 Internal Controls for Excessing and Surplusing Unclassified Computers atLos Alamos National Laboratory The Department of Energy's (DOE's) Los Alamos National AND OBJECTIVE Laboratory (LANL) is one of the largest multidisciplinary science institutions in the world. The primary national security missions of LANL are to help ensure the safety and reliability of the Nation's nuclear stockpile, prevent the spread of weapons of mass destruction, develop strategies to mitigate global threats, and protect the United States from terrorist attacks. LANL is managed by the University of California for the Department's National Nuclear Security Administration (NNSA). Inspection Report: IG-0734 More Documents & Publications

214

Inspection Report: IG-0770 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 Inspection Report: IG-0770 July 20, 2007 Protective Force MK-19 Grenade Launcher Use at the National Nuclear Security Administration's Pantex Facility The National Nuclear Security Administration's (NNSA) Pantex Facility is this Nation's only nuclear weapons assembly and disassembly facility. The nature of such work necessitates the development and implementation of protection strategies based upon the Department of Energy's (Department) Design Basis Threat process. Facilities such as Pantex develop Site Safeguards and Security Plans to describe the physical protection programs, evaluations of risk, and identified facility targets associated with the threat. Inspection Report: IG-0770 More Documents & Publications 40 MM Grenade Launcher Qualification Requirements at Department of Energy

215

Inspection Report: IG-0605 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

05 05 Inspection Report: IG-0605 June 5, 2003 National Nuclear Security Administration's Ability to Meet the Aircraft Requirements of the Joint Technical Operations Team Worldwide events have heightened concerns over terrorist attacks, particularly with regard to the possible use of weapons of mass destruction, including radioactive devices, in such attacks. A recent training exercise in Seattle, Washington, involving a simulated terrorist attack using a radioactive "dirty bomb" highlighted the importance of cooperation and coordination by Federal, State, and local governments in providing a rapid, planned response to a terrorist incident involving a weapon of mass destruction. Inspection Report: IG-0605 More Documents & Publications Audit Report: IG-0435

216

Future Inspection of Overhead Transmission Lines  

Science Conference Proceedings (OSTI)

This report documents scenarios and technologies that can be applied in the future for the inspection of transmission lines. Scenarios describe the utilization of a range of concepts, including distributed sensors, unmanned airborne vehicles, RF communication, and robotics. An approach to performing demonstration projects using currently available technologies is provided and will be implemented in the following phases of the project.

2008-06-23T23:59:59.000Z

217

Plant Guide to Turbine Disk Rim Inspection  

Science Conference Proceedings (OSTI)

Steam turbine disk rims are one of the most highly stressed areas of the rotor. Periodic inspection of the rims provides information on the operability of the rotor, including the identification of conditions that could result in catastrophic failure of the rotor.

2006-12-18T23:59:59.000Z

218

Adaptive surface inspection via interactive evolution  

Science Conference Proceedings (OSTI)

An increasingly frequent application of Machine Vision technologies is in automated surface inspection for the detection of defects in manufactured products. Such systems offer significant benefits in terms of cost, detection rates, and user-satisfaction ... Keywords: Configuration, Evolution, Interative, Machine vision

P. Caleb-Solly; J. E. Smith

2007-07-01T23:59:59.000Z

219

Western University Nuclear Radiation Safety Inspection Checklist  

E-Print Network (OSTI)

with unsealed nuclear substances. Print out of wipe test kept in the logbook . For safety work practices, rightMay 2012 Western University Nuclear Radiation Safety Inspection Checklist Permit Holder to nuclear substances or radiation devices is restricted to authorized radiation users listed on the permit

Sinnamon, Gordon J.

220

A Machine Vision System for Inspecting Bearings  

Science Conference Proceedings (OSTI)

In this paper, we describe a machine vision system for inspecting bearings, which are an important part of electro-mechanical kWh meters. The system consists of a personal computer with a frame grabber, a black and white progressive scan CCD camera, ... Keywords: machine vision, quality control, bearing, eccentricity

2000-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "roadside inspection wri" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Field Guide: Visual Inspection of Polymer Insulators  

Science Conference Proceedings (OSTI)

The Field Guide: Visual Inspection of Polymer Insulators visually catalogs the various condition issues that commonly affect transmission line polymer insulators (also known as composite or non-ceramic insulators (NCIs)). The guide is conveniently organized according to the portion of the polymer insulator affected, and includes a section on failure modes, indicating the key features and root ...

2013-10-28T23:59:59.000Z

222

LIMERICK GENERATING STATION- NRC INTEGRATED INSPECTION  

E-Print Network (OSTI)

Units 1 and 2. The enclosed report documents the inspection findings which were discussed on October 4, 2002, with Mr. W. Levis and other members of your staff. This inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license. The inspectors reviewed procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, the inspectors identified four issues of very low safety significance (Green). Two of these issues were determined to involve violations of NRC requirements. However, because of their very low safety significance and because they have been entered into your corrective action program, the NRC is treating these issues as Non-Cited Violations, in accordance with Section VI.A.1 of the NRCs Enforcement Policy. If you deny these non-cited violations, you should provide a response with the basis for your denial, within 30 days of the date of this inspection report, to the Nuclear Regulatory Commission,

Exelon Nuclear

2002-01-01T23:59:59.000Z

223

Explosion proof vehicle for tank inspection  

Science Conference Proceedings (OSTI)

An Explosion Proof Vehicle (EPV) having an interior substantially filled with an inert fluid creating an interior pressure greater than the exterior pressure. One or more flexible tubes provide the inert fluid and one or more electrical conductors from a control system to the vehicle. The vehicle is preferably used in subsurface tank inspection, whereby the vehicle is submerged in a volatile fluid.

Zollinger, William T. (Idaho Falls, ID); Klingler, Kerry M. (Idaho Falls, ID); Bauer, Scott G. (Idaho Falls, ID)

2012-02-28T23:59:59.000Z

224

REPORT ON INSPECTION OF CONCERNS REGARDING DOE'S EVALUATION OF...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REPORT ON INSPECTION OF CONCERNS REGARDING DOE'S EVALUATION OF CHEVRON U.S.A.'S UNSOLICITED PROPOSAL FOR THE ELK HILLS NAVAL PETROLEUM RESERVE, INS-O-98-01 REPORT ON INSPECTION OF...

225

Inspection of Concerns Regarding the Martin Marietta Corporate...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 "Inspection of Concerns Regarding the Martin Marietta Corporate Review of Health and Safety at Martin Marietta Energy Systems"...

226

Fuel Reliability Guidelines: Fuel Surveillance and Inspection, Revision 1  

Science Conference Proceedings (OSTI)

This Electric Power Research Institute (EPRI) report presents revised guidance for performing nuclear fuel assessments and inspections. The revision provides technical guidance on the scope and frequency of fuel performance assessments and inspections to support the industry goal of zero fuel failures and performance issues. To help achieve this goal, both failed and healthy fuel must be inspected. Such inspections advance the understanding of fuel failure mechanisms and unit-specific fuel margins, leadi...

2012-03-30T23:59:59.000Z

227

A flying robotic system for power line corridor inspection  

Science Conference Proceedings (OSTI)

So far, the inspection of power line corridors is mainly carried out by manual or helicopters. However, manual inspection is very labour-intensive and inefficient. On the other hand, the cost of the inspection using helicopters is very high. Also the ...

Binhai Wang; Lei Han; Hailong Zhang; Qian Wang; Bingqiang Li

2009-12-01T23:59:59.000Z

228

241-AZ Farm Annulus Extent of Condition Baseline Inspection  

Science Conference Proceedings (OSTI)

This report provides the results of the comprehensive annulus visual inspection for tanks 241- AZ-101 and 241-AZ-102 performed in fiscal year 2013. The inspection established a baseline covering about 95 percent of the annulus floor for comparison with future inspections. Any changes in the condition are also included in this document.

Engeman, Jason K.; Girardot, Crystal L.; Vazquez, Brandon J.

2013-05-15T23:59:59.000Z

229

Knowledge discovery in inspection reports of marine structures  

Science Conference Proceedings (OSTI)

Inspection reports, commonly called ''punches'' in the marine structuring domain, are written documents about defects or supplementations on marine structures. Analyzing the inspection reports improves the construction process for the structure and prevents ... Keywords: Inspection process, Knowledge Discovery in Textual Databases, Shipbuilding and marine engineering industry, Text mining

Seung-Kyung Lee, Bongseok Kim, Minhoe Huh, Jooseoung Park, Seokho Kang, Sungzoon Cho, Dongha Lee, Daehyung Lee

2014-03-01T23:59:59.000Z

230

Licensee contractor and vendor inspection status report. Quarterly report, April 1997--June 1997  

Science Conference Proceedings (OSTI)

This periodical covers the results of inspections performed between April 1997 and June 1997 by the NRC`s Special Inspection Branch, Inspection Section, that have been distributed to the inspected organizations.

NONE

1997-11-01T23:59:59.000Z

231

Licensee contractor and vendor inspection status report. Quarterly report, January 1995--March 1995  

Science Conference Proceedings (OSTI)

This periodical covers the results of inspections performed by the NRC`s Special Inspection Branch, Vendor Inspection Section, that have been distributed to the inspected organizations during the period from January 1995 through March 1995.

NONE

1995-05-01T23:59:59.000Z

232

Licensee contractor and vendor inspection status report. Quarterly report, October--December 1996  

Science Conference Proceedings (OSTI)

This periodical covers the results of inspections performed by the NRC`s Special Inspection Branch, Vendor Inspection Section, that have been distributed to the inspected organizations during the period from October 1996 through December 1996.

NONE

1997-03-01T23:59:59.000Z

233

Microsoft Word - WRI50 Report-finaldraft-1312005.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

cooling with flooded underground mines as the principal heat sink for the power plant reject heat load. Existing mine discharges in the Pittsburgh Coal Basin were...

234

Protocol, Inspection Criteria - April 23, 2008 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Inspection Criteria - April 23, 2008 Inspection Criteria - April 23, 2008 Protocol, Inspection Criteria - April 23, 2008 April 23, 2008 Inspection Criteria, Activities, and Lines of Inquiry, April 23, 2008 Emergency planning includes the identification of hazards and threats. A hazards survey is the qualitative portion of the hazards identification process. It briefly describes the potential impacts of emergency events or conditions and summarizes the planning and preparedness requirements that apply. If determined to be required, an EPHA includes the identification and characterization of hazardous materials specific to a facility/site, analyses of potential accidents or events, and evaluation of potential consequences. Protocol, Inspection Criteria - April 23, 2008 More Documents & Publications

235

Vehicle To Roadside Communications Study  

E-Print Network (OSTI)

was started in the field of RTI but several work items ofCSI/USC potential interest in RTI are well in the process ofstandardization needs in the RTI area with an indication of

1993-01-01T23:59:59.000Z

236

Inspection Report: IG-0677 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 Inspection Report: IG-0677 February 22, 2005 Security and Other Issues Related to Out-Processing of Employees at Los Alamos National Laboratory The core mission of the Department of Energy's (DOE's) Los AND OBJECTIVES Alamos National Laboratory (LANL) is to enhance global security, develop technical solutions to reduce the weapons of mass destruction threat, and improve the cold war environmental and nuclear materials legacy. Given its national security mission, LANL is one of DOE's most sensitive sites. LANL is operated by the University of California (UC) and administered by the National Nuclear Security Administration (NNSA). It directly employs approximately 7,500 UC employees. Approximately 800 UC employees terminate employment at LANL annually. Inspection Report: IG-0677

237

Inspection Report: IG-0517 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

17 17 Inspection Report: IG-0517 August 24, 2001 Inspection of Selected Office of Security and Emergency Operations Firearms Inventories The Department of Energy (DOE) maintains a large inventory of firearms for use by protective forces at numerous DOE sites and for training at the Nonproliferation and National Security Institute (NNSI), formerly the Central Training Academy. Some excess firearms, as well as firearms that are not needed to meet current operational requirements, are stored by the Office of Security and Emergency Operations (SO) at its Headquarters facility at Germantown, Maryland, and at the NNSI facility at Albuquerque, New Mexico. Strict inventory controls are necessary for these firearms, which are considered "sensitive" property. The objective of our review

238

Inspection Report: IG-0533 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 Inspection Report: IG-0533 December 7, 2001 Inspection of the Department of Energy's Automated Export Control System The National Defense Authorization Act for Fiscal Year 2000 (NDAA for FY 2000) contained a provision that not later than March 30 of each year the President will submit to Congress, beginning in the year 2000 and ending in the year 2007, an annual report on the Government's policies and procedures with respect to the export of technologies and technical information with potential military applications to countries and entities of concern. Under the Act's provisions, to assist in this process, annual audits in this area are to be conducted by the Inspectors General of the Departments of Energy, Commerce, Defense, and State. An interagency working

239

Inspection Report: IG-0732 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Inspection Report: IG-0732 June 30, 2006 The Human Reliability Program at Lawrence Livermore National Laboratory The Department of Energy's (DOE's) Lawrence Livermore National Laboratory (LLNL) supports the core mission of maintaining a safe, secure, and reliable nuclear weapons stockpile and applies scientific expertise towards the prevention of the proliferation of weapons of mass destruction and terrorist attacks. LLNL is managed by the University of California for the Department's National Nuclear Security Administration (NNSA). Inspection Report: IG-0732 More Documents & Publications VWA-0044 - In the Matter of Janet K. Benson VBA-0011 - In the Matter of Diane E. Meier GAO-04-986R Lawrence Livermore National Laboratory: Further Improvements Needed to Strengthen Controls Over the Purchase Card Program

240

Inspection Report: IG-0445 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 Inspection Report: IG-0445 May 28, 1999 Inspection of the Department of Energy's Export Licensing Process for Dual-Use and Munitions Commodities On August 26, 1998, the Chairman of the Senate Committee on Governmental Affairs requested that the Inspectors General from the Departments of Commerce, Defense, Energy, State, and Treasury, and the Central Intelligence Agency, update and expand on a 1993 interagency review of the export licensing processes for dual-use and munitions commodities. After consideration of the Chairman's request, the Inspectors General initiated and interagency review to evaluate the export licensing process for dual-use commodities and munitions to determine whether current practices and procedures are consistent with established national security and

Note: This page contains sample records for the topic "roadside inspection wri" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Inspection Report: IG-0636 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

36 36 Inspection Report: IG-0636 January 23, 2004 Protective Force Performance Test Improprieties On June 26, 2003, a protective force performance test was conducted at the Department of Energy's Y-12 National Security Complex, which is a component of the National Nuclear Security Administration (NNSA). The purpose of the test was to obtain realistic data for developing the Y-12 Site Safeguards and Security Plan. The mission at the site includes a number of sensitive activities, such as enriched uranium material warehousing, and weapon dismantlement and storage. These activities necessitate that the site have a protective force capable of responding to potential security incidents such as terrorist attack. Inspection Report: IG-0636 More Documents & Publications

242

Inspection Report: IG-0438 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 Inspection Report: IG-0438 January 25, 1999 Inspection of Reporting at Oak Ridge of Potential Noncompliances With DOE Price-Anderson Amendments Act Implementing Rules To provide oversight of how well Department of Energy (DOE) contractors were adhering to the nuclear safety rules established by the Department to implement the Price-Anderson Amendments Act of 1988 (PAAA), DOE established an enforcement program, managed by the Office of Environment, Safety and Health (EH). The purpose of the program is to identify and penalize DOE contractors for unsafe actions or conditions that violate nuclear safety requirements for protecting workers and the public. The single most important goal of the Department's PAAA enforcement program is to encourage early identification and reporting of nuclear safety deficiencies

243

Inspection Report: IG-0636 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

36 36 Inspection Report: IG-0636 January 23, 2004 Protective Force Performance Test Improprieties On June 26, 2003, a protective force performance test was conducted at the Department of Energy's Y-12 National Security Complex, which is a component of the National Nuclear Security Administration (NNSA). The purpose of the test was to obtain realistic data for developing the Y-12 Site Safeguards and Security Plan. The mission at the site includes a number of sensitive activities, such as enriched uranium material warehousing, and weapon dismantlement and storage. These activities necessitate that the site have a protective force capable of responding to potential security incidents such as terrorist attack. Inspection Report: IG-0636 More Documents & Publications

244

Inspection Report: IG-0477 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 Inspection Report: IG-0477 July 26, 2000 Inspection of Cost Recovery Concerns at the Office of Scientific and Technical Information The Office of Inspector General (OIG), U.S. Department of Energy (DOE), received a complaint concerning possible misuse of cost recovery funds at the Office of Scientific and Technical Information (OSTI). Specifically, it was alleged that: 1) some cost recovery funds from DOE's Office of Defense Programs were placed in OSTI's "general fund" and used for miscellaneous expenses unrelated to the Work Authorization provided by Defense Programs; 2) some cost recovery funds were used to cover Federal employee salaries; and 3) Defense Programs funds were used to purchase a computer server which was not used for a Defense Programs project. As you

245

Inspection Report: IG-0497 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

7 7 Inspection Report: IG-0497 March 13, 2001 Inspection of Concerns Relating to the Management of the Savannah River Operations Office LEARN/POWER Information System The Office of Inspector General (OIG), U.S. Department of Energy (DOE), received information that the Savannah River Operations Office (Savannah River) continued to develop, implement, and market a human resource information system, despite the establishment of a Departmental information system entitled the "Corporate Human Resource Information System" (CHRIS). We recently sent you our audit report of the Department's "Corporate and Stand Alone Information Systems Development" (DOE/IG-0485). In that audit, we concluded that the Department has spent at least $38 million developing duplicative information systems.

246

Inspection Report: IG-0472 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Inspection Report: IG-0472 June 1, 2000 Inspection of Surplus Computer Equipment Management at the Savannah River Site By letter dated November 1, 1999, Senator Strom Thurmond advised the Office of Inspector General of an allegation that computer equipment containing over 40 computer hard drives reportedly containing classified or sensitive information were surplused and sold by the Department's Savannah River Site (SRS). The letter raised the concern that the release of this information might pose a threat to the national security of the United States. The management and operating contractor at SRS, Westinghouse Savannah River Company (Westinghouse), is responsible for the final disposal of surplus equipment, including computer hard drives. The purpose

247

PAIR (Planning and Analysis of Inspection Resources)  

SciTech Connect

The safeguards inspection effort of the International Atomic Energy Agency consists of the efforts for the Physical Inventory Verifications to close the annual material balance, Interim Inventory Verifications, conducted mainly to satisfy the Timeliness Criteria, Flow Verifications to verify the transfer of material, and Containment and Surveillance activities, which help preserve continuity of knowledge concerning the material. Estimating the requiring overall future inspection effort under a variety of conditions is an important part of Agency planning. As exemplified by the sample results provides a straightforward means to analyze `What if` situations in safeguards implementation. It thereby permits managers and analysts to study future scenarios and their effect on human resources. It is planned to introduce into PAIR a direct capability for studying costs associated with these hypothetical changes in safeguards implementation. In this way PAIR could more easily assist the Safeguards Department in its current program of investigating new safeguards approaches.

Teichmann, T.; Santaniello, A. [Brookhaven National Lab., Upton, NY (United States); Fishbone, L.G. [International Atomic Energy Agency, Vienna (Austria)

1994-03-01T23:59:59.000Z

248

System for inspecting large size structural components  

DOE Patents (OSTI)

The present invention relates to a system for inspecting large scale structural components such as concrete walls or the like. The system includes a mobile gamma radiation source and a mobile gamma radiation detector. The source and detector are constructed and arranged for simultaneous movement along parallel paths in alignment with one another on opposite sides of a structural component being inspected. A control system provides signals which coordinate the movements of the source and detector and receives and records the radiation level data developed by the detector as a function of source and detector positions. The radiation level data is then analyzed to identify areas containing defects corresponding to unexpected variations in the radiation levels detected.

Birks, Albert S. (Columbus, OH); Skorpik, James R. (Kennewick, WA)

1990-01-01T23:59:59.000Z

249

Remote Inspection, Measurement and Handling for LHC  

E-Print Network (OSTI)

Personnel access to the LHC tunnel will be restricted to varying extents during the life of the machine due to radiation, cryogenic and pressure hazards. The ability to carry out visual inspection, measurement and handling activities remotely during periods when the LHC tunnel is potentially hazardous offers advantages in terms of safety, accelerator down time, and costs. The first applications identified were remote measurement of radiation levels at the start of shut-down, remote geometrical survey measurements in the collimation regions, and remote visual inspection during pressure testing and initial machine cool-down. In addition, for remote handling operations, it will be necessary to be able to transmit several real-time video images from the tunnel to the control room. The paper describes the design, development and use of a remotely controlled vehicle to demonstrate the feasibility of meeting the above requirements in the LHC tunnel. Design choices are explained along with operating experience to-dat...

Kershaw, K; Coin, A; Delsaux, F; Feniet, T; Grenard, J L; Valbuena, R

2007-01-01T23:59:59.000Z

250

Inspection Report: IG-0585 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

85 85 Inspection Report: IG-0585 February 12, 2013 Inspection of Implementation of Corrective Actions Resulting From Force-on-Force Performance Tests The Office of Independent Oversight and Performance Assurance (OA) conducts reviews of Department of Energy (DOE) facilities and operations to evaluate the status of, among other things, safeguards and security matters. Integral to these reviews are force-on-force performance tests. These are major tests of the overall effectiveness of all site safeguards and security elements involved in responding to a hypothetical threat scenario based on the design basis threat1 and identified site-specific threats. These tests employ an adversary team that tests the skills, procedures and equipment of those forces responsible for protecting DOE site security

251

Inspection Report: IG-0592 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Inspection Report: IG-0592 March 1, 2003 Actions Taken in Response to Missing Hazardous Waste Containing Cyanide Recently, the U.S. Government has become increasingly sensitive to the potential for terrorists to use certain materials as weapons of mass destruction. A report completed by the Central Intelligence Agency stated that "The threat from terrorists using a weapon of mass destruction has increased since Sept. 11, and extremist groups appear most interested in chemicals like cyanide." For example, in February 2002, four suspected terrorists were arrested in Italy in possession of cyanide and maps of Rome pinpointing the U.S. Embassy and the city's drinking water network. Inspection Report: IG-0592 More Documents & Publications Semiannual Report to Congress: October 1, 2002 - March 31, 2003

252

Independent Oversight Inspection, Argonne National Laboratory-West -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Inspection, Argonne National Laboratory-West Inspection, Argonne National Laboratory-West - November 2004 Independent Oversight Inspection, Argonne National Laboratory-West - November 2004 November 2004 Emergency Management Inspection of the Argonne National Laboratory-West The Secretary of Energy's Office of Independent Oversight and Performance Assurance (OA), within the Office of Security and Safety Performance Assurance, conducted an inspection of the emergency management program at the U.S. Department of Energy (DOE) Argonne National Laboratory - West (ANL-W) site in October 2004. The inspection was performed by the OA Office of Emergency Management Oversight. Following the 2001 OA inspection, ANL-W completed a number of activities that improved the site emergency management program. ANL-W developed a

253

Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Inspection  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Alternative Fuel Alternative Fuel Vehicle (AFV) Inspection and Maintenance Exemption to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Inspection and Maintenance Exemption on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Inspection and Maintenance Exemption on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Inspection and Maintenance Exemption on Google Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Inspection and Maintenance Exemption on Delicious Rank Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Inspection and Maintenance Exemption on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Inspection and Maintenance Exemption on AddThis.com...

254

Independent Oversight Inspection, Pantex Plant - June 2009 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Oversight Inspection, Pantex Plant - June 2009 Independent Oversight Inspection, Pantex Plant - June 2009 Independent Oversight Inspection, Pantex Plant - June 2009 June 2009 Inspection of Environment, Safety, and Health Programs at the Pantex Plant The U.S. Department of Energy (DOE) Office of Independent Oversight, within the Office of Health, Safety and Security, inspected environment, safety, and health (ES&H) programs at the DOE Pantex Plant during March through April 2009. The inspection was performed by the Office of Independent Oversight's Office of Environment, Safety and Health Evaluations. Throughout this Independent Oversight inspection, B&W Pantex management, supervisors, and workers demonstrated their commitment to performing work safely, and management has shown an understanding of many of the areas

255

Inspection, Oak Ridge National Laboratory - July 2004 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Inspection, Oak Ridge National Laboratory - July 2004 Inspection, Oak Ridge National Laboratory - July 2004 Inspection, Oak Ridge National Laboratory - July 2004 July 2004 Inspection of Environment, Safety, and Health Management at the Oak Ridge National Laboratory The Secretary of Energy's Office of Independent Oversight and Performance Assurance (OA) conducted an inspection of environment, safety, and health (ES&H) at the U.S. Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) during June and July 2004. The inspection was performed by the OA Office of Environment, Safety and Health Evaluations. Overall, significant improvement was evident in all areas reviewed since the 2001 inspection, when ORO/OSO lacked structured oversight processes, ORNL lacked effective work control processes, the SBMS was not fully

256

Independent Oversight Inspection, Office of Secure Transportation - March  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Inspection, Office of Secure Transportation - Inspection, Office of Secure Transportation - March 2007 Independent Oversight Inspection, Office of Secure Transportation - March 2007 March 2007 Inspection of Emergency Management at the Office of Secure Transportation The Secretary of Energy's Office of Independent Oversight, within the Office of Health, Safety and Security, conducted an inspection of the emergency management program at the Office of Secure Transportation (OST) in January and February 2007. The inspection was performed by the Office of Emergency Management Oversight. This 2007 inspection found that, in general, OST efforts have been effective in addressing weaknesses in field response; however, some corrective actions were either ineffective or did not fully address elements of the program, particularly those that affect the EOC cadre. A

257

Sub-Grade Corrosion Inspection Guide  

Science Conference Proceedings (OSTI)

The electric power industry maintains an immense number of transmission and distribution structures that are subject to sub-grade corrosion. As this vast fleet ages, the inspection, assessment, and maintenance of existing facilities have become increasingly important topics. This report is a comprehensive summary of corrosion basics as they apply to sub-grade corrosion in tubular structures. Coverage includes the electrochemical mechanisms of corrosion, types of corrosion, laboratory methods for measurin...

2009-12-23T23:59:59.000Z

258

Inspection of Nuclear Power Plant Containment Structures  

SciTech Connect

Safety-related nuclear power plant (NPP) structures are designed to withstand loadings from a number of low-probability external and interval events, such as earthquakes, tornadoes, and loss-of-coolant accidents. Loadings incurred during normal plant operation therefore generally are not significant enough to cause appreciable degradation. However, these structures are susceptible to aging by various processes depending on the operating environment and service conditions. The effects of these processes may accumulate within these structures over time to cause failure under design conditions, or lead to costly repair. In the late 1980s and early 1990s several occurrences of degradation of NPP structures were discovered at various facilities (e.g., corrosion of pressure boundary components, freeze- thaw damage of concrete, and larger than anticipated loss of prestressing force). Despite these degradation occurrences and a trend for an increasing rate of occurrence, in-service inspection of the safety-related structures continued to be performed in a somewhat cursory manner. Starting in 1991, the U.S. Nuclear Regulatory Commission (USNRC) published the first of several new requirements to help ensure that adequate in-service inspection of these structures is performed. Current regulatory in-service inspection requirements are reviewed and a summary of degradation experience presented. Nondestructive examination techniques commonly used to inspect the NPP steel and concrete structures to identify and quantify the amount of damage present are reviewed. Finally, areas where nondestructive evaluation techniques require development (i.e., inaccessible portions of the containment pressure boundary, and thick heavily reinforced concrete sections are discussed.

Graves, H.L.; Naus, D.J.; Norris, W.E.

1998-12-01T23:59:59.000Z

259

Field Guide: Visual Inspection of Wood Structures  

Science Conference Proceedings (OSTI)

The Field Guide: Visual Inspection of Wood Structures is a catalog of photographs illustrating various conditions and factors that commonly affect transmission line wood structures, along with their likely causes, a Maintenance Priority Rating, and suggested actions to be taken by utility personnel. Poles, cross-arms, cross-arm braces, X-braces, brackets, anchor rods, guy wires, and direct imbedded foundations are covered. Other sections include types of wood structures, the anatomy of wood ...

2013-10-28T23:59:59.000Z

260

APPLYING SIMPLE TECHNOLOGY ACCOMPLISHES VISUAL INSPECTION CHALLENGES  

SciTech Connect

This paper discusses the successful implementation of simple video technologies at the Savannah River Site (SRS) to perform complex visual inspection, monitoring, and surveillance tasks. Because SRS facilities are similar to those of an industrial plant, the environmental and accessibility considerations for remote viewing are the primary determining factors in the selection of technology. The constraints and challenges associated with remote viewing are discussed, and examples of applications are given.

Robinson, C

2007-07-21T23:59:59.000Z

Note: This page contains sample records for the topic "roadside inspection wri" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

PILGRIM NUCLEAR POWER STATION- NRC INTEGRATED INSPECTION  

E-Print Network (OSTI)

inspection results, which were discussed on July 18, 2012 with you and other members of your staff. The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. This report documents one NRC-identified finding of very low safety significance (Green). This finding was determined to involve a violation of NRC requirements. However, because of its very low safety significance, and because it has been entered into your corrective action program (CAP), the NRC is treating this finding as a non-cited violation (NCV), consistent with Section 2.3.2 of the NRC Enforcement Policy. If you contest any NCV in this report, you should provide a written response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region I; the Director,

Region I; Mr. Robert Smith; Pilgrim Nuclear; Power Station

2012-01-01T23:59:59.000Z

262

Independent Oversight Inspection, East Tennessee Technology Park, Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oversight Inspection, East Tennessee Technology Park, Oversight Inspection, East Tennessee Technology Park, Summary Report - May 2003 Independent Oversight Inspection, East Tennessee Technology Park, Summary Report - May 2003 May 2003 Inspection of Environment, Safety, and Health and Emergency Management at the Oak Ridge Operations Office and East Tennessee Technology Park The Secretary of Energy's Office of Independent Oversight and Performance Assurance (OA) conducted an inspection of environment, safety, and health (ES&H) and emergency management programs at the U.S. Department of Energy (DOE) East Tennessee Technology Park (ETTP) site in April and May 2003. The inspection was performed as a joint effort by the OA Office of Environment, Safety and Health Evaluations and the Office of Emergency Management

263

Inspection, Kansas City Plant - May 2004 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Inspection, Kansas City Plant - May 2004 Inspection, Kansas City Plant - May 2004 Inspection, Kansas City Plant - May 2004 May 2004 Inspection of Environment, Safety, and Health Management at the Kansas City Plant The Secretary of Energy's Office of Independent Oversight and Performance Assurance (OA) conducted an inspection of environment, safety, and health (ES&H) at the U.S. Department of Energy (DOE) Kansas City Plant (KCP) site during April and May 2004. The inspection was performed by the OA Office of Environment, Safety and Health Evaluations. Overall, FM&T management, ES&H subject matter experts, and the individuals who conduct work activities and safety management at KCP are experienced and exhibit a commitment to safety and quality work. The site has a good safety record, and safety performance metrics indicate improving trends.

264

Independent Oversight Inspection, Y-12 National Security Complex, Volume  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Oversight Inspection, Y-12 National Security Complex, Independent Oversight Inspection, Y-12 National Security Complex, Volume III - November 2001 Independent Oversight Inspection, Y-12 National Security Complex, Volume III - November 2001 November 2001 Inspection of Emergency Management at the Y-12 National Security Complex The Secretary of Energy's Office of Independent Oversight and Performance Assurance (OA) conducted an emergency management program review at the Y-12 National Security Complex (Y-12) in October 2001. The purpose of this inspection was to assess Y-12's readiness to protect site personnel and the public from the consequences of onsite events that could result in the release of hazardous materials from site facilities and activities. Independent Oversight Inspection, Y-12 National Security Complex, Volume

265

Independent Oversight Inspection, Hanford Site - February 2009 | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Oversight Inspection, Hanford Site - February 2009 Independent Oversight Inspection, Hanford Site - February 2009 Independent Oversight Inspection, Hanford Site - February 2009 February 2009 Inspection of Environment, Safety and Health Programs at the Hanford Site Waste Treatment and Immobilization Plant The U.S. Department of Energy (DOE) Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), inspected environment, safety, and health (ES&H) programs at the DOE Hanford Site Waste Treatment and Immobilization Plant (WTP) during October through November 2008. HSS reports directly to the Office of the Secretary of Energy, and the ES&H inspection was performed by Independent Oversight's Office of Environment, Safety and Health Evaluations. BNI has made significant improvements in nuclear safety processes, in part,

266

Independent Oversight Inspection of Environment, Safety, and Health  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Inspection of Environment, Safety, and Health Inspection of Environment, Safety, and Health Programs at the Savannah River Operations Office and Savannah River Site, January 2010 Independent Oversight Inspection of Environment, Safety, and Health Programs at the Savannah River Operations Office and Savannah River Site, January 2010 The U.S. Department of Energy (DOE) Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), inspected environment, safety, and health (ES&H) programs at the DOE Savannah River Site (SRS) during August and September 2009. The inspection was performed by the Office of Independent Oversight's Office of Environment, Safety and Health Evaluations to support site management in the execution of the SRS mission. This 2009 Independent Oversight inspection was conducted during a period in

267

Independent Oversight Inspection, Nevada Test Site - June 2007 | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nevada Test Site - June 2007 Nevada Test Site - June 2007 Independent Oversight Inspection, Nevada Test Site - June 2007 June 2007 Inspection of Emergency Management at the Nevada Test Site The U.S. Department of Energy (DOE) Office of Independent Oversight inspected the emergency management program at DOE's Nevada Test Site (NTS) in March-April 2007. The inspection was performed as a joint effort by Independent Oversight's Office of Environment, Safety and Health Evaluations (HS-64) and the Office of Emergency Management Oversight (HS-63). This 2007 inspection found that NSO and NTS organizations have generally continued to improve the site's emergency management program. The most noteworthy program attribute identified during this emergency management inspection is that NSO, NSTec, and JNPO have established and provided the

268

Independent Oversight Inspection, Idaho National Laboratory - August 2007 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Inspection, Idaho National Laboratory - Inspection, Idaho National Laboratory - August 2007 Independent Oversight Inspection, Idaho National Laboratory - August 2007 August 2007 Inspection of Environment, Safety, and Health Programs at the Idaho National Laboratory's Materials and Fuels Complex The U.S. Department of Energy (DOE) Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), inspected environment, safety, and health (ES&H) programs at the DOE Idaho Operations Office (ID) and the Idaho National Laboratory (INL) Materials and Fuels Complex (MFC) during June and July 2007. The ES&H inspection was performed by Independent Oversight's Office of Environment, Safety and Health Evaluations. NE, ID, and BEA have many aspects of an effective ISM program in place, and

269

Independent Oversight Inspection, Pantex Plant, Volume I- February 2005 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Inspection, Pantex Plant, Volume I- February Inspection, Pantex Plant, Volume I- February 2005 Independent Oversight Inspection, Pantex Plant, Volume I- February 2005 February 2005 Inspection of Environment, Safety, and Health Programs at the Pantex Plant The U.S. Department of Energy (DOE) Office of Independent Oversight and Performance Assurance (OA) conducted an inspection of environment, safety, and health (ES&H) programs at the DOE Pantex Plant during January and February 2005. The inspection was performed by the OA Office of Environment, Safety and Health Evaluations. OA reports to the Director of the Office of Security and Safety Performance Assurance, who reports directly to the Secretary of Energy. Overall, PXSO and BWXT have effectively applied ISM principles and core functions to nuclear explosive and explosive hazards. These hazards have

270

Independent Oversight Inspection, Sandia National Laboratories - July 2006  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Laboratories - Laboratories - July 2006 Independent Oversight Inspection, Sandia National Laboratories - July 2006 July 2006 Emergency Management Inspection of the Sandia National Laboratories The U.S. Department of Energy (DOE) Office of Independent Oversight inspected the emergency management program at DOE Sandia National Laboratories (SNL) in May 2006. The inspection was performed by the Independent Oversight Office of Emergency Management Oversight. Independent Oversight reports to the Director of the Office of Security and Safety Performance Assurance, who reports directly to the Secretary of Energy. This 2006 inspection found that SSO's and SNL's efforts over the past year have been mostly effective in addressing longstanding weaknesses. The widespread program improvements observed during this inspection can be

271

Independent Oversight Inspection, East Tennessee Technology Park - November  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

East Tennessee Technology Park - East Tennessee Technology Park - November 2008 Independent Oversight Inspection, East Tennessee Technology Park - November 2008 November 2008 Inspection of Environment, Safety, and Health Programs at the East Tennessee Technology Park The U.S. Department of Energy (DOE) Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), inspected environment, safety, and health (ES&H) programs at the DOE East Tennessee Technology Park (ETTP) during August through September 2008. HSS reports directly to the Office of the Secretary of Energy, and the ES&H inspection was performed by Independent Oversight's Office of Environment, Safety and Health Evaluations. The inspection was performed concurrently with an inspection of emergency management at the Oak Ridge National Laboratory,

272

Independent Oversight Inspection, Argonne National Laboratory, Volume 1 -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Inspection, Argonne National Laboratory, Inspection, Argonne National Laboratory, Volume 1 - May 2005 Independent Oversight Inspection, Argonne National Laboratory, Volume 1 - May 2005 May 2005 Inspection of Environment, Safety, and Health Programs at the Argonne National Laboratory The U.S. Department of Energy (DOE) Office of Independent Oversight and Performance Assurance (OA) inspected environment, safety, and health (ES&H) programs at the DOE Argonne National Laboratory (ANL) during April and May 2005. The inspection was performed by the OA Office of Environment, Safety and Health Evaluations. SC, ASO, and ANL have made improvements in a number of ISM elements. The ANL ES&H Manual effectively identifies applicable site-specific requirements and regulatory requirements. Several ANL organizations have

273

Independent Oversight Inspection, Sandia National Laboratories, Volume 1 -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oversight Inspection, Sandia National Laboratories, Oversight Inspection, Sandia National Laboratories, Volume 1 - May 2005 Independent Oversight Inspection, Sandia National Laboratories, Volume 1 - May 2005 May 2005 Inspection of Environment, Safety, and Health Programs at the Sandia National Laboratories The U.S. Department of Energy (DOE) Office of Independent Oversight and Performance Assurance (OA) inspected environment, safety, and health (ES&H) programs at DOE Sandia National Laboratories (SNL) during March and April 2005. The inspection was performed by the OA Office of Environment, Safety and Health Evaluations. SSO and SNL have established ISM systems that are conceptually sound but that are implemented with varying levels of effectiveness by line management in the various line organizations. SNL personnel are typically

274

Independent Oversight Inspection, INEEL, Summary Report - September 2003 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Oversight Inspection, INEEL, Summary Report - September Independent Oversight Inspection, INEEL, Summary Report - September 2003 Independent Oversight Inspection, INEEL, Summary Report - September 2003 September 2003 Inspection of Environment, Safety, and Health Management and Emergency Management of the Idaho Operations Office and Idaho National Engineering and Environmental Laboratory The Secretary of Energy's Office of Independent Oversight and Performance Assurance (OA) conducted an inspection of environment, safety, and health (ES&H) and emergency management programs at the U.S. Department of Energy (DOE) Idaho National Engineering and Environmental Laboratory (INEEL) site in August and September 2003. The inspection was performed jointly by the OA Office of Environment, Safety and Health Evaluations and the Office of

275

Independent Oversight Inspection, Savannah River Site - February 2006 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site - February Savannah River Site - February 2006 Independent Oversight Inspection, Savannah River Site - February 2006 February 2006 Inspection of Emergency Management at the Savannah River Site The U.S. Department of Energy (DOE) Office of Independent Oversight conducted an inspection of environment, safety, and health and emergency management programs at the DOE Savannah River Site (SRS) in January and February 2006. The inspection was performed as a joint effort by Independent Oversight's Office of Environment, Safety and Health Evaluations and Office of Emergency Management Oversight. This 2006 Independent Oversight inspection found that nearly all of the WSRC weaknesses from the 2004 inspection have been addressed. Actions included implementing a comprehensive hazardous material screening process,

276

Independent Oversight Inspection, Nevada Test Site, Volume 2 - September  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Oversight Inspection, Nevada Test Site, Volume 2 - Independent Oversight Inspection, Nevada Test Site, Volume 2 - September 2004 Independent Oversight Inspection, Nevada Test Site, Volume 2 - September 2004 September 2004 Inspection of Emergency Management at the Nevada Test Site The Secretary of Energy's Office of Independent Oversight and Performance Assurance (OA), within the Office of Security and Safety Performance Assurance, conducted an inspection of safeguards and security and emergency management programs at the U.S. Department of Energy's (DOE) Nevada Test Site (NTS) in July and August 2004. The inspection was performed as a joint effort by the OA Office of Safeguards and Security Evaluations and Office of Emergency Management Oversight. This volume discusses the results of the review of the NTS emergency management program.

277

Independent Oversight Inspection, Oak Ridge National Laboratory - October  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Oversight Inspection, Oak Ridge National Laboratory - Independent Oversight Inspection, Oak Ridge National Laboratory - October 2008 Independent Oversight Inspection, Oak Ridge National Laboratory - October 2008 October 2008 Inspection of Nuclear Safety at the Oak Ridge National Laboratory Radiochemical Engineering Development Center, Building 7920 The U.S. Department of Energy (DOE) Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), inspected nuclear safety programs at the DOE Building 7920 of the Radiochemical Engineering Development Center (REDC) at the Oak Ridge National Laboratory (ORNL) during August through September 2008. The nuclear safety inspection was performed by Independent Oversight's Office of Environment, Safety and Health Evaluations. Overall, significant improvement was evident in all areas reviewed since

278

Independent Oversight Inspection, Y-12 National Security Complex, Volume I  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Oversight Inspection, Y-12 National Security Complex, Independent Oversight Inspection, Y-12 National Security Complex, Volume I - September 2005 Independent Oversight Inspection, Y-12 National Security Complex, Volume I - September 2005 September 2005 Inspection of Environment, Safety, and Health Programs at the Y-12 National Security Complex, Summary Report The U.S. Department of Energy (DOE) Office of Independent Oversight and Performance Assurance (OA) conducted an inspection of environment, safety, and health (ES&H) programs at the DOE Y-12 National Security Complex (Y-12) during August and September 2005. The inspection was performed by the OA Office of Environment, Safety and Health Evaluations. YSO and BWXT have established ISM systems that are conceptually sound. BWXT also has appropriate programs in place to ensure the functionality of the

279

Independent Oversight Inspection, Y-12 National Security Complex - April  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Inspection, Y-12 National Security Complex - Inspection, Y-12 National Security Complex - April 2003 Independent Oversight Inspection, Y-12 National Security Complex - April 2003 Inspection of Environment, Safety, and Health Management at the Y-12 National Security Complex The Secretary of Energy's Office of Independent Oversight and Performance Assurance (OA) conducted an inspection of environment, safety, and health (ES&H) at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in March-April 2003. The inspection was performed by OA's Office of Environment, Safety and Health Evaluations. Overall, YSO and BWXT have established a generally effective ISM program. YSO and BWXT management have demonstrated their commitment to continuous improvement and have effective tools and process enhancements to address

280

Independent Oversight Inspection, Nevada Test Site, Summary Report -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oversight Inspection, Nevada Test Site, Summary Report Oversight Inspection, Nevada Test Site, Summary Report - October 2002 Independent Oversight Inspection, Nevada Test Site, Summary Report - October 2002 October 2002 Inspection of Environment, Safety, and Health and Emergency Management at the Nevada Test Site The Secretary of Energy's Office of Independent Oversight and Performance Assurance (OA) conducted an inspection of environment, safety, and health (ES&H) and emergency management programs at the National Nuclear Security Administration (NNSA) Nevada Test Site (NTS) in September and October 2002. The inspection was performed as a joint effort by the OA Office of Environment, Safety and Health Evaluations and the Office of Emergency Management Oversight. Overall, safety management at NTS has substantially improved in the past

Note: This page contains sample records for the topic "roadside inspection wri" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Independent Oversight Inspection, Waste Isolation Pilot Plant, Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Oversight Inspection, Waste Isolation Pilot Plant, Independent Oversight Inspection, Waste Isolation Pilot Plant, Summary Report - August 2002 Independent Oversight Inspection, Waste Isolation Pilot Plant, Summary Report - August 2002 August 2002 Inspection of Environment, Safety, and Health and Emergency Management at the Waste Isolation Pilot Plant The Secretary of Energy's Office of Independent Oversight and Performance Assurance (OA) conducted an inspection of environment, safety, and health (ES&H) and emergency management programs at the U.S. Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) in July and August 2002. The inspection was performed as a joint effort by the OA Office of Environment, Safety and Health Evaluations and the Office of Emergency Management Oversight. The results of this review indicate that, overall, CBFO and WTS have

282

MACS as a tool for international inspections  

SciTech Connect

General acceptance of the challenge provision in the Chemical Weapons Convention has the potential for influence in other arms control areas. While most applications of the challenge inspection may be straightforward, there may be instances where access to the site by inspectors may be problematic. The MACS system described in this paper was developed to respond to these situations. Inspection and verification may be difficult when a host is unwilling,for valid reasons, to permit physical access to a site. We proposed a system of remote sensors which may be used to demonstrate compliance with Chemical Weapons Convention (CWC) challenge inspections even ff the inspector is physically excluded from a sensitive site. The system is based upon alternative-means-of-access provisions of the CWC. The Defense Nuclear Agency (DNA) funded design and construction of a system prototype, designated as MACS for Managed Access by Controlled Sensing. Features of the MACS design allow growth of the prototype into a versatile device for international monitoring of production facilities and other sites. MACS consists of instrumentation and communication equipment allowing site personnel to conduct a facility tour and perform acceptable measurements, while physically excluding the inspector from the facility. MACS consists of a base station used by the inspector, and a mobile unit used within the facility and manipulated by the facility staff. The base station and the mobile unit are @ed by a communication system, currently realized as a fiber optic cable. The mobile unit is equipped with television cameras and remote-reading distance-measuring equipment (DME) for use in verifying locations and dimensions. Global Positioning System receivers on the mobile unit provide both precise location and dead reckoning, suitable for tracking the mobile unit`s position while within a building when satellite signals are not available.

Curtiss, J.A.; Indusi, J.P.

1995-06-01T23:59:59.000Z

283

Inspection Report: IG-0796 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

796 796 Inspection Report: IG-0796 July 1, 2008 Internal Controls Over Sensitive Compartmented Information Access for Selected Field Intelligence Elements As a member of the U.S. Government's Intelligence Community, the Department of Energy (DOE) serves as the premier technical intelligence resource in the areas of nuclear weapons, nonproliferation, energy, science, and technology, as well as emerging nuclear threats. In addition to providing intelligence analyses, DOE offers specialized technology and operational support to both intelligence and law enforcement agencies. DOE accomplishes its intelligence mission by drawing from technical expertise located throughout the Department complex, including the national laboratories. This necessitates Department-affiliated personnel having

284

Inspection Report: IG-0759 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

59 59 Inspection Report: IG-0759 March 5, 2007 Excessing of Computers Used for Unclassified Controlled Information at Lawrence Livermore National Laboratory National Laboratory (LLNL) is a research and development institution that supports the core mission of national security. The University of California manages and operates LLNL for the National Nuclear Security Administration (NNSA). DOE spends over $2 billion each year on information technology and has a current inventory of approximately 800 information systems, including up to 115,000 personal computers, many powerful supercomputers, numerous servers, and a broad array of related peripheral equipment. The unclassified computers and electronic memory devices in these information technology systems may contain "unclassified controlled

285

Inspection Report: IG-0762 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Inspection Report: IG-0762 March 28, 2007 Internal Controls Over Computer Property at the Department's Counterintelligence Directorate The Office of Intelligence and Counterintelligence conducts AND OBJECTIVE technical analyses of foreign intelligence for the Department of Energy (DOE), including the National Nuclear Security Administration, and the United States Intelligence Community. The Counterintelligence Directorate (CN), which is part of the Office of Intelligence and Counterintelligence, is responsible for protecting DOE information against espionage or other intelligence activities by foreign entities. In support of this mission, CN procures and maintains computer processing equipment such as desktop computers, laptop computers, and computer servers. DOE considers computer

286

Inspection Report: IG-0719 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

19 19 Inspection Report: IG-0719 February 2, 2006 Protective Force Contracts at the Oak Ridge Reservation The Department of Energy (DOE) mission at the Oak Ridge AND OBJECTIVE Reservation requires a paramilitary protective force comprised of several hundred security police officers to safeguard the production and storage of nuclear weapons components, special nuclear material, and other sensitive work. Wackenhut Services, Inc. (Wackenhut) initially provided protective force services for the Oak Ridge Reservation under one contract. However, protective services for the Y-12 National Security Complex were segregated into a separate contract following the establishment of the National Nuclear Security Administration (NNSA). As a result, Wackenhut now provides

287

Inspection Report: IG-0593 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 Inspection Report: IG-0593 April 1, 2003 Concerns Related to the Office of International Material Protection and Emergency Cooperation The Office of Inspector General (OIG) received allegations regarding the Material Protection, Control and Accounting Program managed by the Office of International Material Protection and Emergency Cooperation (IMPEC), National Nuclear Security Administration (NNSA), Department of Energy (DOE). The allegations centered on: * the creation of an advisory committee, the Board of Visitors1, in possible violation of the Federal Advisory Committee Act (FACA), and * the inappropriate handling of payments from an unauthorized sublease for office space to support the Material Protection, Control and Accounting Program in Moscow, Russia. The

288

Acoustic microscope surface inspection system and method  

DOE Patents (OSTI)

An acoustic microscope surface inspection system and method in which pulses of high frequency electrical energy are applied to a transducer which forms and focuses acoustic energy onto a selected location on the surface of an object and receives energy from the location and generates electrical pulses. The phase of the high frequency electrical signal pulses are stepped with respected to the phase of a reference signal at said location. An output signal is generated which is indicative of the surface of said selected location. The object is scanned to provide output signals representative of the surface at a plurality of surface locations.

Khuri-Yakub, Butrus T. (Palo Alto, CA); Parent, Philippe (Chilly-Mazarin, FR); Reinholdtsen, Paul A. (Seattle, WA)

1991-01-01T23:59:59.000Z

289

Coordinate Measuring Machine Pit Artifact Inspection Procedure  

Science Conference Proceedings (OSTI)

The goal of this document is to outline a procedure for dimensional measurement of Los Alamos National Laboratory's CMM Pit Artifact. This procedure will be used by the Manufacturing Practice's Inspection Technology Subgroup of the Interagency Manufacturing Operations Group and Joint Operations Weapon Operations Group (IMOG/JOWOG 39) round robin participants. The intent is to assess the state of industry within the Nuclear Weapons Complex for measurements made on this type of part and find which current measurement strategies and techniques produce the best results.

Montano, Joshua D. [Los Alamos National Laboratory

2012-07-31T23:59:59.000Z

290

MFL tool hardware for pipeline inspection  

SciTech Connect

The intelligent pig based on the magnetic flux leakage (MFL) is frequently used for inline inspection of gas and liquid transportation pipelines. The tool is capable of reliably detecting and characterizing several commonly occurring pipeline defects including metal loss due to corrosion and gouges, dents, and buckles, which tend to threaten the structural integrity of the pipeline. The defect detection and characterization capabilities of the tool are directly dependent upon the type of critical hardware components and systems selected for the tool assembly. This article discusses the key components of an advanced or high resolution MFL tool.

Tandon, K.K. [Engineers India Ltd., Haryana (India). Research and Development Complex

1997-02-01T23:59:59.000Z

291

Inspection Report: IG-0820 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 Inspection Report: IG-0820 September 4, 2009 Lawrence Livermore National Laboratory Protective Force Authority The Department of Energy's (Department) Lawrence Livermore National Laboratory (Livermore) is a premier research and development institution supporting the Department's scientific, engineering, environmental, and national security activities. Livermore is managed and operated under contract by Lawrence Livermore National Security (LLNS) LLC, for the Department's National Nuclear Security Administration (NNSA). In accordance with the Department's safeguards and security policy, Livermore maintains a cadre of armed protective force officers to prevent and defend against malevolent acts. Federal regulations establish protective force arrest authority to enforce specific laws regarding

292

Emerging and Future Inspection of Overhead Transmission Lines  

Science Conference Proceedings (OSTI)

This technical update report describes research by the Electric Power Research Institute (EPRI) into emerging and future overhead electric transmission line inspection and assessment technologies. In 2008, EPRI published a report entitled Future Inspection of Overhead Transmission Lines (product 1016921) that documented scenarios and viable technologies that could be applied for the inspection of transmission lines over a multi-decade timeframe. That document was intended to provide a roadmap for near- a...

2011-12-22T23:59:59.000Z

293

Revised Risk-Informed Inservice Inspection Evaluation Procedure  

Science Conference Proceedings (OSTI)

Operating nuclear power plants currently rely on the implementation of ASME Section XI inservice inspection (ISI) programs for integrity management of Class 1, 2, and 3 systems and components. The evaluation procedure documented in this report provides a practical approach that can be consistently applied by nuclear plant personnel to identify risk-significant pipe segments, define the elements that are to be inspected within these risk-significant segments, and identify appropriate inspection methods.

2000-01-12T23:59:59.000Z

294

Report on Crossarm Inspection Tools, Techniques, and Evaluations  

Science Conference Proceedings (OSTI)

Wood transmission crossarms, like other wood components, are subject to deterioration from mechanical stresses, decay, weathering, insect attack, and so on. Although the condition of these components is critical to maintaining line integrity, no methods beyond visual inspection, hammer sounding, and surface probing are widely used for their inspection. Recognizing the technology and technique gaps in crossarm inspection, the Electric Power Research Institute (EPRI) initiated research activities to develo...

2010-12-23T23:59:59.000Z

295

Appendix B Landfill Inspection Forms and Survey Data  

Office of Legacy Management (LM)

B B Landfill Inspection Forms and Survey Data This page intentionally left blank This page intentionally left blank Original Landfill January 2012 Monthly Inspection-Attachment 1 The monthly inspection of the OLF was completed on January 30. The Rocky Flats Site only received .15 inches of precipitation during the month of January. The cover was dry at the time of the inspection. The slump in the East Perimeter Channel (EPC) remained unchanged. Berm locations that were re-graded during the OLF Maintenance 2011 Project remained in good condition. Vegetation on the landfill cover including the seep areas remains dormant. OLF Cover Lower OLF Cover Facing East Upper OLF Cover Facing East

296

Independent Oversight Inspection, Savannah River Site - December 2009 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December December 2009 Independent Oversight Inspection, Savannah River Site - December 2009 December 2009 Inspection of Reinforced Concrete Construction at the Savannah River Site Mixed Oxide Fuel Fabrication Facility The U.S. Department of Energy (DOE) Office of Independent Oversight conducted a nuclear safety inspection at the Mixed Oxide (MOX) Fuel Fabrication Facility (MFFF) construction project, focusing on construction quality, specifically for reinforced concrete, at the MFFF construction project. This purpose of the inspection was to provide mission support to site management in determining whether the facility structure is constructed in accordance with the applicable requirements. The overall quality of concrete that has been placed in the MFFF to date is

297

Independent Oversight Inspection, Oak Ridge Office, East Tennessee  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office, East Tennessee Office, East Tennessee Technology Park - May 2007 Independent Oversight Inspection, Oak Ridge Office, East Tennessee Technology Park - May 2007 May 2007 Inspection of Classification and Information Control Programs at the Oak Ridge Office, East Tennessee Technology Park This report presents the results of inspection activities by the U.S. Department of Energy (DOE) Office of Independent Oversight in the area of classification and information control (CIC) at the Oak Ridge Office (ORO), Oak Ridge National Laboratory (ORNL), East Tennessee Technology Park (ETTP), and the United States Enrichment Corporation (USEC) American Centrifuge Technology Program. The Office of Security Evaluations, within the Office of Independent Oversight, conducted this inspection to evaluate

298

ARM Program Data Quality Inspection and Assessment Activities...  

NLE Websites -- All DOE Office Websites (Extended Search)

ARM Program Data Quality Inspection and Assessment Activities: A Streamlined Approach C. P. Bahrmann, R. A. Peppler, K. L. Sonntag, and A. R. Dean Cooperative Institute for...

299

INSPECTION OF CYBER SECURITY STANDARDS FOR SENSITIVE PERSONAL...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CYBER SECURITY STANDARDS FOR SENSITIVE PERSONAL INFORMATION, IG-0531 INSPECTION OF CYBER SECURITY STANDARDS FOR SENSITIVE PERSONAL INFORMATION, IG-0531 The Office of Inspector...

300

INSPECTION ON THE MANAGEMENT OF EXCESS PERSONAL PROPERTY AT LAWRENCE...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technology Centers Field Sites Power Marketing Administration Other Agencies You are here Home INSPECTION ON THE MANAGEMENT OF EXCESS PERSONAL PROPERTY AT LAWRENCE LIVERMORE...

Note: This page contains sample records for the topic "roadside inspection wri" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Development of the Degradation Inspection Method of Inconel 718 ...  

Science Conference Proceedings (OSTI)

The flow chart of TEF inspection method in serviced turbine disk is shown in Fig. 11. Reliability of TEF measurement shall be confirmed by using standard silver...

302

Inspection Report: INS-O-01-03  

Energy.gov (U.S. Department of Energy (DOE))

Inspection of the Department of Energys Role in the Commerce Control List and the U.S. Munitions List

303

Independent Oversight Inspection of Emergency Management at the...  

NLE Websites -- All DOE Office Websites (Extended Search)

of Energy July 2002 Volume II INDEPENDENT OVERSIGHT INSPECTION OF EMERGENCY MANAGEMENT AT THE LAWRENCE LIVERMORE NATIONAL LABORATORY Volume II July 2002 i INDEPENDENT...

304

Inspection of Emergency Management at the Argonne National Laboratory...  

NLE Websites -- All DOE Office Websites (Extended Search)

Secretary of Energy May 2002 Volume II INDEPENDENT OVERSIGHT INSPECTION OF EMERGENCY MANAGEMENT AT THE ARGONNE NATIONAL LABORATORY - EAST Volume II May 2002 i INDEPENDENT OVERSIGHT...

305

Inspection of Emergency Management at the Waste Isolation Pilot...  

NLE Websites -- All DOE Office Websites (Extended Search)

of Energy August 2002 Volume II INDEPENDENT OVERSIGHT INSPECTION OF EMERGENCY MANAGEMENT AT THE WASTE ISOLATION PILOT PLANT Volume II August 2002 i INDEPENDENT OVERSIGHT...

306

Independent Oversight Inspection of Emergency Management at the...  

NLE Websites -- All DOE Office Websites (Extended Search)

of Energy February 2003 Volume II INDEPENDENT OVERSIGHT INSPECTION OF EMERGENCY MANAGEMENT AT THE SANDIA NATIONAL LABORATORIES - NEW MEXICO Volume II February 2003 i...

307

Inspection, Los Alamos National Laboratory - January 2008 | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

inspection was performed by Independent Oversight's Office of Environment, Safety and Health Evaluations. LANL has made progress in a number of areas, but deficiencies are...

308

SUMMARY REPORT ON INSPECTION OFISSUES ASSOCIATED WITH THE DEPARTMENT...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OFISSUES ASSOCIATED WITH THE DEPARTMENT OF ENERGY'S TRITIUM SOURCE SELECTION PROCESS, IG-0431 SUMMARY REPORT ON INSPECTION OFISSUES ASSOCIATED WITH THE DEPARTMENT OF ENERGY'S...

309

Enhanced Photofission-based, Coincidence/Multiplicity Inspection Measurements  

SciTech Connect

An enhanced active interrogation system has been developed that integrates a transportable Idaho National Laboratory (INL) photonuclear inspection system, using a pulsed bremsstrahlung source and a reconfigurable neutron detection system, with a Los Alamos National Laboratory (LANL) list-mode data acquisition system. A series of active interrogation experiments have shown enhanced nuclear material detection and identification utilizing pulsed photofission-induced, neutron coincidence/multiplicity counting between pulses of an up-to-10-MeV electron accelerator. This paper describes the integrated inspection system and presents some key shielded and unshielded nuclear material inspection results. The enhanced inspection methodology has applicability to homeland security and possible nuclear weapon dismantlement treaties.

J.L. Jones; D.R. Norman; K.J. Haskell; M.T. Swinhoe; S.J. Tobin; W.H. Geist; R.B. Rothrock; C.R. Freeman

2010-07-01T23:59:59.000Z

310

Report on Inspection of Analytical Laboratories Oversight at...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Analytical Laboratories Oversight at the Strategic Petroleum Reserve, INS-9502 Report on Inspection of Analytical Laboratories Oversight at the Strategic Petroleum Reserve,...

311

Use, Maintenance, Removal, Inspections, and Safety of Dams (Iowa)  

Energy.gov (U.S. Department of Energy (DOE))

This section describes operating plans for dams with movable structures, as well as procedures for raising or lowering of impoundment levels, dam removal, and dam safety inspections.

312

Appendix A Annual Inspection Checklist, Maps, and Photographs  

Office of Legacy Management (LM)

This page intentionally left blank This page intentionally left blank This page intentionally left blank Annual Site Inspection 2011 Photos B-9 - Depression that was filled in...

313

Report on "Inspection of Reporting at Oak Ridge of Potential...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Administration Other Agencies You are here Home Report on "Inspection of Reporting at Oak Ridge of Potential Noncompliances With DOE Price-Anderson Amendments Act Implementing...

314

Energy Savings Modeling and Inspection Guidelines for Commercial...  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Savings Modeling and Inspection Guidelines for Commercial Building Federal Tax Deductions Second Edition M. Deru Technical Report NRELTP-550-40467 May 2007 NREL is operated...

315

Inspection of Environment, Safety, and Health Management of the...  

NLE Websites -- All DOE Office Websites (Extended Search)

pump shutdown systems, and various support systems). The OA inspection team used a selective sampling approach to determine the effectiveness of ID and BBWI in implementing...

316

Inspection of Environment, Safety, and Health Management at the...  

NLE Websites -- All DOE Office Websites (Extended Search)

radiological characterization, and contamination control. The OA inspection team used a selective sampling approach to determine the effectiveness of OR and ETTP in implementing...

317

Inspection of Savannah River Operations Office Managementof Emergency...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Operations Office Managementof Emergency Response and Law Enforcement-Related Grants, IG-0604 Inspection of Savannah River Operations Office Managementof Emergency...

318

Frederick County (Maryland) Department of Permits and Inspections (FCDPI)  

Energy.gov (U.S. Department of Energy (DOE))

The Frederick County (Maryland) Department of Permits and Inspections (FCDPI) is currently reviewing two proposed amendments to the 2012 International Energy Conservation Code (IECC), copies of...

319

Modelling and control of underwater inspection vehicle for aquaculture sites.  

E-Print Network (OSTI)

?? Underwater vehicles such as AUVs and ROVs with hovering capabilities is a promising method for inspection of net integrity in large scale, sea based, (more)

Hval, Mats Nvik

2012-01-01T23:59:59.000Z

320

Inspection of the Establishment and Filling of the Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

per diem for a period of almost two years in accordance with applicable policies and procedures? II. SCOPE AND METHODOLOGY In conducting our inspection, we interviewed the...

Note: This page contains sample records for the topic "roadside inspection wri" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

V-232: Cisco ASA Software TFTP Protocol Inspection Denial of...  

NLE Websites -- All DOE Office Websites (Extended Search)

vulnerability is caused due to an error within the idle timeout implementation when handling inspect based TFTP connections and can be exploited to exhaust the connection...

322

Independent Oversight Inspection of Emergency Management at the...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of the Secretary of Energy July 2002 Volume II INDEPENDENT OVERSIGHT INSPECTION OF EMERGENCY MANAGEMENT AT THE LAWRENCE LIVERMORE NATIONAL LABORATORY Volume II July 2002 i...

323

Independent Oversight Inspection of Emergency Management at the...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the Secretary of Energy February 2003 Volume II INDEPENDENT OVERSIGHT INSPECTION OF EMERGENCY MANAGEMENT AT THE SANDIA NATIONAL LABORATORIES - NEW MEXICO Volume II February 2003...

324

Independent Oversight Inspection of Emergency Management at the...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hanford Site August 2001 Washington, DC 20585 i INDEPENDENT OVERSIGHT INSPECTION OF EMERGENCY MANAGEMENT AT THE HANFORD SITE VOLUME III Table of Contents Acronyms...

325

Inspection of Emergency Management at the Argonne National Laboratory...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of the Secretary of Energy May 2002 Volume II INDEPENDENT OVERSIGHT INSPECTION OF EMERGENCY MANAGEMENT AT THE ARGONNE NATIONAL LABORATORY - EAST Volume II May 2002 i...

326

Reduced Mandated Inspection by Remote Field Eddy Current Inspection of Unpiggable Pipelines  

Science Conference Proceedings (OSTI)

The Remote Field Eddy Current (RFEC) technique is ideal for inspecting unpiggable pipelines because all of its components can be made much smaller than the diameter of the pipe to be inspected. For this reason, RFEC was chosen as a technology for unpiggable pipeline inspections by DOE-NETL with the support of OTD and PRCI, to be integrated with platforms selected by DOENETL. As part of the project, the RFEC laboratory facilities were upgraded and data collection was made nearly autonomous. The resulting improved data collection speeds allowed GTI to test more variables to improve the performance of the combined RFEC and platform technologies. Tests were conducted on 6-, 8-, and 12-inch seamless and seam-welded pipes. Testing on the 6-inch pipes included using seven exciter coils, each of different geometry with an initial focus on preparing the technology for use on an autonomous robotic platform with limited battery capacity. Reductions in power consumption proved successful. Tests with metal components similar to the Explorer II modules were performed to check for interference with the electromagnetic fields. The results of these tests indicated RFEC would be able to produce quality inspections while on the robot. Mechanical constraints imposed by the platform, power requirements, control and communication protocols, and potential busses and connectors were addressed. Much work went into sensor module design including the mechanics and electronic diagrams and schematics. GTI participated in two Technology Demonstrations for inspection technologies held at Battelle Laboratories. GTI showed excellent detection and sizing abilities for natural corrosion. Following the demonstration, module building commenced but was stopped when funding reductions did not permit continued development for the selected robotic platform. Conference calls were held between GTI and its sponsors to resolve the issue of how to proceed with reduced funding. The project was rescoped for 10-16-inch pipes with the intent of looking at lower cost, easier to implement, tethered platform applications. OTD ended its sponsorship.

Albert Teitsma; Julie Maupin

2006-09-29T23:59:59.000Z

327

DOE Olk Office of Inspections -- Pakistan DRAi,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Olk Office of Inspections -- Pakistan DRAi, DOE Olk Office of Inspections -- Pakistan DRAi, 6/12/96 7:53 AM ... ..... ........ ..... f M ain T ri........... . Trip Per Name Aff Phase Offici Bus ______Company/ Trip # # Last, First Code Pre Main Advan Deleg Deleg Other Travel Dates Org Code Function 8 4f l..__.__ C-1 _ Y _ ______BC _09/19-25/94 Lawrence Berkeley Lab. 7Bus Deleg 8 _1 __ F-1i BC __ __ 09/11-25/94 HR-77 4Substance 8 2 F-f- Y 08/17-27/94 PO-72 4Substance 8 2 F-1 - Y _BC 09/19-25/94 PO-72 4Substance 8 231 F-1. 8 = B 0911-28/94 HR-432.3 2Commo 8 4 F-2 t Y BC 09/19-25194 S-1 4Substance 8 166 F-1' i Y - BC 09/19-25/94 TSD/PCS I Security 8 13 F-1 ' C ~ 09/10.25/94 HR-853 3Admin 8 18 F-1 I A _A 09/13-23/94 TSD/SCS 1 Security 8 19 F-i1 BC 09/11-26/94 FE-30 4Substance 8 21 __F-1 ." B 09/13-22/94 HR-851 3Admin

328

Eddy current inspection tool. [Patent application  

DOE Patents (OSTI)

A miniaturized inspection tool, for testing and inspection of metal objects in locations with difficult accessibility, which comprises eddy current sensing equipment with a probe coil, and associated coaxial coil cable, oil energizing means, and circuit means responsive to impedance changes in the coil as effected by induced eddy currents in a test object to produce a data output signal proportional to such changes. The coil and cable are slideably received in the utility channel of the flexible insertion tube of a fiberoptic scope. The scope is provided with light transmitting and receiving fiberoptics for viewing through the flexible tube, and articulation means for articulating the distal end of the tube and permitting close control of coil placement relative to a test object. The eddy current sensing equipment includes a tone generator for generating audible signals responsive to the data output signal. In one selected mode of operation, the tone generator responsive to the output signal above a selected level generates a constant single frequency tone for signalling detection of a discontinuity and, in a second selected mode, generates a tone whose frequency is proportional to the difference between the output signal and a predetermined selected threshold level.

Petrini, R.R.; Van Lue, D.F.

1980-10-29T23:59:59.000Z

329

Applicability of the semiotic inspection method: a systematic literature review  

Science Conference Proceedings (OSTI)

In 2006 the Semiotic Inspection Method (SIM) was proposed and the authors raised the hypothesis that it was a technology and domain independent evaluation method. The aim of this study was to investigate whether published studies describing the use of ... Keywords: applicability, semiotic engineering, semiotic inspection method, systematic literature review

Soraia De S. Reis; Raquel O. Prates

2011-10-01T23:59:59.000Z

330

Literature Survey of Crossarm Inspection Tools and Techniques  

Science Conference Proceedings (OSTI)

Maintaining the electric power industry's aging transmission system presents an ongoing challenge, but little work has been done to specifically address the inspection of wood, steel, or fiberglass crossarms. This report identifies and describes inspection techniques for the wood and steel crossarms used in transmission systems. It covers potential or emerging technologies as well as commercially available methods.

2009-12-23T23:59:59.000Z

331

System dynamics model for simulation of the software inspection process  

Science Conference Proceedings (OSTI)

Repairing a defect in the late phases of software development can be a hundred times more expensive than finding and fixing it during the requirements and design phase. Software inspection is a technique that may be used to aid in the identification ... Keywords: defect detection, software inspection, system dynamics

Jailton Jr. De Sousa Coelho, Jos Luis Braga, Bernardo Giori Ambrsio

2013-08-01T23:59:59.000Z

332

Independent Oversight Inspection, Pantex Plant - August 2005 | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pantex Plant - August 2005 Pantex Plant - August 2005 Independent Oversight Inspection, Pantex Plant - August 2005 August 2005 Inspection of Emergency Management at the Pantex Site Office and the Pantex Plant The Secretary of Energy's Office of Independent Oversight and Performance Assurance (OA), within the Office of Security and Safety Performance Assurance, conducted an inspection of the emergency management program at the U.S. Department of Energy (DOE) Pantex Plant in July and August 2005. The inspection was performed by the OA Office of Emergency Management Oversight. This 2005 OA inspection found that PXSO and BWXT have adequately addressed most of these weaknesses and have improvement initiatives underway in some other areas. The resulting changes include a substantially improved

333

CRAD, Performance-Based Inspection - November 29, 2011 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Performance-Based Inspection - November 29, 2011 Performance-Based Inspection - November 29, 2011 CRAD, Performance-Based Inspection - November 29, 2011 November 20, 2011 Performance-Based Inspection of Environmental Management Systems: Inspection Criteria, approach, and Lines of Inquiry (HSS CRAD 45-38, Rev. 1) The following provides an overview of the typical activities that will be performed to collect information to evaluate the effectiveness of the environmental management system. Several terms used throughout this document are defined (last three terms based on ISO 14001 :2004(E) Section 3, Terms and Definitions) as follows: The term "activities" encompasses various types of projects including construction, restoration, maintenance, operations, research and development (R&D), and other work activities that could expose the workers,

334

CRAD, Nuclear Facility Construction - Piping and Pipe Supports Inspection -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Construction - Piping and Pipe Supports Construction - Piping and Pipe Supports Inspection - March 29, 2012 CRAD, Nuclear Facility Construction - Piping and Pipe Supports Inspection - March 29, 2012 March 29, 2012 Nuclear Facility Construction - Piping and Pipe Supports Inspection Criteria, Approach and Lines of Inquiry (HSS CRAD 45-52, Rev. 0) For the purpose of this criteria review and approach, this Criteria Review and Approach Document (CRAD) includes piping and pipe supports and attachments of the pipe supports to structures (concrete, structural steel, or embed plates). Pipe supports include rigid restraints, welded attachments to piping, struts, snubbers, spring cans, and constant supports. Inspection of pipe whip restraints are also included in this CRAD. Selection of nuclear facility piping systems for inspection should be

335

CRAD, Performance Based Inspection - June 9, 2009 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Performance Based Inspection - June 9, 2009 Performance Based Inspection - June 9, 2009 CRAD, Performance Based Inspection - June 9, 2009 June 9, 2009 Performance Based Inspection of Worker Safety and Health Utilizing the ISM Core Functions: Inspection Criteria, Approach, and Lines of Inquiry, (HSS CRAD 64-10, Rev. 2) The focus of this Criteria Review and Approach Document (CRAD) is on observing work activities to determine if implementation of systems, programs, and practices result in application of adequate controls to protect against the associated hazards. Where deficiencies are identified, systems, programs, and practices are reviewed to identify if systemic weaknesses are present. This CRAD also includes engagement of workers and their site union representatives with regard to involvement in work

336

Independent Oversight Inspection, Oak Ridge National Laboratory - October  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oak Ridge National Laboratory - Oak Ridge National Laboratory - October 2008 Independent Oversight Inspection, Oak Ridge National Laboratory - October 2008 October 2008 Inspection of Emergency Management at the Oak Ridge National Laboratory The U.S. Department of Energy (DOE) Office of Independent Oversight inspected the emergency management program at DOE's Oak Ridge National Laboratory (ORNL) in August 2008. The inspection was performed by Independent Oversight's Office of Emergency Management Oversight. This 2008 inspection found that ORO and UT-Battelle, together with other site contractors, have implemented a comprehensive emergency management program that broadly protects site workers and the public in the event of a significant emergency at ORNL and that, with few exceptions, meets DOE

337

Independent Oversight Inspection, Waste Isolation Pilot Plant - December  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waste Isolation Pilot Plant - Waste Isolation Pilot Plant - December 2007 Independent Oversight Inspection, Waste Isolation Pilot Plant - December 2007 December 2007 Inspection of Emergency Management at the Carlsbad Field Office and Waste Isolation Pilot Plant The U.S. Department of Energy (DOE) Office of Independent Oversight inspected the emergency management program at DOE's Waste Isolation Pilot Plant (WIPP) from July through September 2007. The inspection was performed by Independent Oversight's Office of Emergency Management Oversight. This 2007 inspection found that despite isolated areas of program improvement since 2002, WIPP's level of emergency preparedness has largely declined over a period marked by a dramatic increase in the pace of waste receipt and storage activities at the site.

338

Inspection of Environment, Safety, and Health and Emergency Management at  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Inspection of Environment, Safety, and Health and Emergency Inspection of Environment, Safety, and Health and Emergency Management at the Nevada Test Site - Summary Report, October 2002 Inspection of Environment, Safety, and Health and Emergency Management at the Nevada Test Site - Summary Report, October 2002 The Secretary of Energy's Office of Independent Oversight and Performance Assurance (OA) conducted an inspection of environment, safety, and health (ES&H) and emergency management programs at the National Nuclear Security Administration (NNSA) Nevada Test Site (NTS) in September and October 2002. The inspection was performed as a joint effort by the OA Office of Environment, Safety and Health Evaluations and the Office of Emergency Management Oversight. As discussed throughout this report, the emergency management program at

339

Independent Oversight Inspection of Environment, Safety, and Health  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Inspection of Environment, Safety, and Health Inspection of Environment, Safety, and Health Programs at the Sandia National Laboratories, Technical Appendices, Volume II, May 2005 Independent Oversight Inspection of Environment, Safety, and Health Programs at the Sandia National Laboratories, Technical Appendices, Volume II, May 2005 The U.S. Department of Energy (DOE) Office of Independent Oversight and Performance Assurance (OA) inspected environment, safety, and health (ES&H) programs at DOE Sandia National Laboratories (SNL) during March and April 2005. The inspection was performed by the OA Office of Environment, Safety and Health Evaluations. This volume of the report provides four technical appendices (C through F) containing detailed results of the OA review. Appendix C provides the results of the review of the application of the core functions of ISM for

340

NETL: News Release - DOE-Funded Pipeline Robot Revolutionizes Inspection  

NLE Websites -- All DOE Office Websites (Extended Search)

December 04, 2007 December 04, 2007 DOE-Funded Pipeline Robot Revolutionizes Inspection Process Explorer II Demonstrates Huge Potential for Hard-to-Reach Gas Line Inspections The Explorer II robot with remote field eddy current sensor deployed. The Explorer II robot with remote field eddy current sensor deployed. MORGANTOWN, W. Va. - Testing of a new, robotic pipeline inspection tool, developed with funding from the U.S. Department of Energy, has shown that it could revolutionize the pipeline inspection process. The wireless, self-propelled Explorer II proved its worth in September when it was put through its paces in a live 8-inch distribution main pressurized at 100 pound per square inch. The robot was launched and retrieved multiple times as it inspected-with cameras and sensors-a section of the Northwest

Note: This page contains sample records for the topic "roadside inspection wri" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Step 4. Inspect the Building During and After Construction | Building  

NLE Websites -- All DOE Office Websites (Extended Search)

4. Inspect the Building During and After Construction 4. Inspect the Building During and After Construction A number of website resources offer checklists to help officials organize the many energy-code-related areas to inspect on the construction site. Several examples of different checklists are listed below. When applicable and approved for use, REScheck and COMcheck inspection checklists should be provided as part of the energy code compliance documentation for the building. REScheck/COMcheck checklists. The REScheck and COMcheck software programs generate reports that list the energy-code-related items to be inspected. The lists include mandatory items such as air leakage control, duct insulation and sealing, temperature controls, and lighting requirements, and can be used by officials to assist during on-site

342

Microsoft Word - Appendix A - Annual Site Inspection Checklist.docx  

Office of Legacy Management (LM)

Site Inspection Checklist Site Inspection Checklist This page intentionally left blank Page ____ of ____ Annual Site Inspection Check List (see RFLMA Attachment 2, Sections 5.3.4, 5.3.6, and 5.4.3) Date Inspection Area: Inspection performed by (print each name): Check all boxes that apply, put ID# on flag and place flag marker in location of observation for follow up. Flag ID# Evidence of Soil Erosion or Deposition Evidence of Cracks, Rills, Gullies Evidence of Sink Holes or Burrows Evidence of Depressions or Subsidence Evidence of Institutional Control Violation 1 Problem with signs or other physical controls 2 Adverse biological condition Photo(s) taken? 3 Notes (Reference Flag ID#):

343

Independent Oversight Inspection of Environment, Safety, and Health  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Inspection of Environment, Safety, and Health Inspection of Environment, Safety, and Health Programs at the Pantex Plant, Technical Appendices, Volume II, February 2005 Independent Oversight Inspection of Environment, Safety, and Health Programs at the Pantex Plant, Technical Appendices, Volume II, February 2005 The U.S. Department of Energy (DOE) Office of Independent Oversight and Performance Assurance (OA) conducted an inspection of environment, safety, and health (ES&H) programs at the DOE Pantex Plant during January and February 2005. The inspection was performed by the OA Office of Environment, Safety and Health Evaluations. OA reports to the Director of the Office of Security and Safety Performance Assurance, who reports directly to the Secretary of Energy. This volume of the report provides four technical appendices (C through F)

344

Independent Oversight Inspection, Oak Ridge National Laboratory - October  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oak Ridge National Laboratory - Oak Ridge National Laboratory - October 2008 Independent Oversight Inspection, Oak Ridge National Laboratory - October 2008 October 2008 Inspection of Emergency Management at the Oak Ridge National Laboratory The U.S. Department of Energy (DOE) Office of Independent Oversight inspected the emergency management program at DOE's Oak Ridge National Laboratory (ORNL) in August 2008. The inspection was performed by Independent Oversight's Office of Emergency Management Oversight. This 2008 inspection found that ORO and UT-Battelle, together with other site contractors, have implemented a comprehensive emergency management program that broadly protects site workers and the public in the event of a significant emergency at ORNL and that, with few exceptions, meets DOE

345

Inspection of Environment, Safety, and Health Programs at the Savannah  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Inspection of Environment, Safety, and Health Programs at the Inspection of Environment, Safety, and Health Programs at the Savannah River Site, February 2006 Inspection of Environment, Safety, and Health Programs at the Savannah River Site, February 2006 The U.S. Department of Energy (DOE) Office of Independent Oversight (Independent Oversight) conducted an inspection of environment, safety, and health (ES&H) programs at the DOE Savannah River Site (SRS) during January and February 2006. The inspection was performed by Independent Oversight's Office of Environment, Safety and Health Evaluations. Most aspects of EM/SR, NNSA/SRSO, and WSRC ISM systems are conceptually sound, and many aspects are effectively implemented. For the most part, WSRC managers and workers were well qualified and demonstrated their understanding of and commitment to safety. WSRC has devoted significant

346

Independent Oversight Inspection, Idaho National Laboratory - August 2007 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 2007 Independent Oversight Inspection, Idaho National Laboratory - August 2007 August 2007 Inspection of Emergency Management at the Idaho National Laboratory The U.S. Department of Energy (DOE) Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), inspected the emergency management program at DOE's Idaho Operations Office (ID) and the Idaho National Laboratory (INL) during June and July 2007. HSS reports directly to the Secretary of Energy. The emergency management inspection was performed by Independent Oversight's Office of Emergency Management Oversight (HS-63). This 2007 inspection found that most elements of the INL emergency management program remain effective. The performance of the ERO is a notable strength. During LSPTs, all elements of the ERO were promptly

347

Independent Oversight Inspection, Hanford Site - June 2010 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 2010 June 2010 Independent Oversight Inspection, Hanford Site - June 2010 June 2010 Inspection of the Hanford Site Chronic Beryllium Disease Prevention Program The U.S. Department of Energy (DOE) Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), conducted an inspection of the beryllium program at the Hanford Site during March and April 2010. The inspection was performed by the Office of Independent Oversight's Office of Environment, Safety and Health Evaluations at the request of the DOE Headquarters Office of Environmental Management (EM) and focused on the Hanford Site's implementation of its recently developed sitewide chronic beryllium disease prevention program (CBDPP). After the onsite portion of the HSS team inspection, RL and ORP reacted

348

Independent Oversight Inspection, Oak Ridge National Laboratory - October  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oak Ridge National Laboratory - Oak Ridge National Laboratory - October 2005 Independent Oversight Inspection, Oak Ridge National Laboratory - October 2005 October 2005 Inspection of Emergency Management at the Oak Ridge Office and the Oak Ridge National Laboratory The Secretary of Energy's Office of Independent Oversight (formerly the Office of Independent Oversight and Performance Assurance), within the Office of Security and Safety Performance Assurance, conducted an inspection of the emergency management program at the U.S. Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) in September and October 2005. The inspection was performed by the Office of Emergency Management Oversight. This 2005 Independent Oversight inspection determined that ORNL has made progress in the areas of EPHAs, integration of the site emergency plan with

349

Independent Oversight Inspection, Y-12 National Security Complex - February  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Y-12 National Security Complex - Y-12 National Security Complex - February 2008 Independent Oversight Inspection, Y-12 National Security Complex - February 2008 February 2008 Inspection of Emergency Management at the Y-12 Site Office and Y-12 National Security Complex The U.S. Department of Energy (DOE) Office of Independent Oversight inspected the emergency management program at DOE's Y-12 National Security Complex (Y-12) in October-November 2007. The inspection was performed by Independent Oversight's Office of Emergency Management Oversight (HS-63). Independent Oversight reports to the Chief, Office of Health, Safety and Security, who reports directly to the Secretary of Energy. This 2007 inspection found that YSO and B&W Y-12 have established an emergency management program that generally protects site workers and the

350

Independent Oversight Inspection of Environment, Safety, and Health  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Inspection of Environment, Safety, and Health Inspection of Environment, Safety, and Health Programs at the Argonne National Laboratory, Technical Appendices, Volume II, May 2005 Independent Oversight Inspection of Environment, Safety, and Health Programs at the Argonne National Laboratory, Technical Appendices, Volume II, May 2005 The U.S. Department of Energy (DOE) Office of Independent Oversight and Performance Assurance (OA) inspected environment, safety, and health (ES&H) programs at the DOE Argonne National Laboratory (ANL) during April and May 2005. The inspection was performed by the OA Office of Environment, Safety and Health Evaluations. This volume of the report provides four technical appendices (C through F) containing detailed results of the OA review. Appendix C provides the results of the review of the application of the core functions of ISM for

351

Independent Oversight Inspection, Pantex Plant - June 2008 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pantex Plant - June 2008 Pantex Plant - June 2008 Independent Oversight Inspection, Pantex Plant - June 2008 June 2008 Inspection of Emergency Management at the Pantex Site Office and Pantex Plant The U.S. Department of Energy (DOE) Office of Independent Oversight inspected the emergency management program at DOE's Pantex Plant in March-April 2008. The inspection was performed by Independent Oversight's Office of Emergency Management Oversight (HS-63). This 2008 Independent Oversight inspection found significant improvements in the functional elements evaluated and, PXSO and B&W Pantex have, for the most part, adequately addressed previously identified weaknesses. B&W Pantex training, drills, and exercise programs have been significantly improved to better prepare ERO members to perform their assigned emergency

352

Independent Oversight Inspection, Sandia National Laboratories - May 2009 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 Independent Oversight Inspection, Sandia National Laboratories - May 2009 May 2009 Inspection of Emergency Management at the Sandia Site Office and Sandia National Laboratories The U.S. Department of Energy (DOE) Office of Independent Oversight inspected the emergency management program at DOE's Sandia National Laboratories (SNL) in January/February 2009. The inspection was performed by Independent Oversight's Office of Emergency Management Oversight. This 2009 inspection found that overall, SSO and SNL are progressing in their efforts to implement a comprehensive emergency management program, but initial emergency response decision-makers continue to have difficulty in effectively issuing appropriate protective actions for site workers and the public. Overall, the SNL emergency management program continues to

353

Independent Oversight Inspection of Environment, Safety, and Health  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Oversight Inspection of Environment, Safety, and Health Independent Oversight Inspection of Environment, Safety, and Health Programs at the Sandia National Laboratories, Technical Appendices, Volume II, May 2005 Independent Oversight Inspection of Environment, Safety, and Health Programs at the Sandia National Laboratories, Technical Appendices, Volume II, May 2005 The U.S. Department of Energy (DOE) Office of Independent Oversight and Performance Assurance (OA) inspected environment, safety, and health (ES&H) programs at DOE Sandia National Laboratories (SNL) during March and April 2005. The inspection was performed by the OA Office of Environment, Safety and Health Evaluations. This volume of the report provides four technical appendices (C through F) containing detailed results of the OA review. Appendix C provides the

354

Inspection of Environment, Safety, and Health Management at the Argonne  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Inspection of Environment, Safety, and Health Management at the Inspection of Environment, Safety, and Health Management at the Argonne National Laboratory - East, Volume I, May 2002 Inspection of Environment, Safety, and Health Management at the Argonne National Laboratory - East, Volume I, May 2002 The Secretary of Energy's Office of Independent Oversight and Performance Assurance (OA) conducted an inspection of environment, safety, and health (ES&H) programs and emergency management programs at the U. S. Department of Energy (DOE) Argonne National Laboratory (ANL) in April and May 2002. The inspection was performed as a joint effort by the OA Office of Environment, Safety and Health Evaluations and the Office of Emergency Management Oversight. This volume discusses the results of the review of ANL ES&H programs. The results of the review of the ANL emergency

355

Independent Oversight Inspection of Environment, Safety, and Health  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Inspection of Environment, Safety, and Health Inspection of Environment, Safety, and Health Management at the Lawrence Livermore National Laboratory, Technical Appendices, Volume II, December 2004 Independent Oversight Inspection of Environment, Safety, and Health Management at the Lawrence Livermore National Laboratory, Technical Appendices, Volume II, December 2004 The U.S. Department of Energy (DOE) Office of Independent Oversight and Performance Assurance (OA), within the Office of Security and Safety Performance Assurance (SSA), conducted an inspection of environment, safety, and health (ES&H) at the DOE Lawrence Livermore National Laboratory (LLNL) during October and November 2004. The inspection was performed by the OA Office of Environment, Safety and Health Evaluations. Volume II of this report provides four technical appendices (C through F)

356

Inspection Report: IG-0650 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

50 50 Inspection Report: IG-0650 June 14, 2004 Internal Controls Over Methamphetamine Precursor Chemicals at the Y-12 National Security Complex and the Oak Ridge National Laboratory The Tennessee Ninth Judicial Drug Task Force requested support from the Office Inspector General (OIG) for the Task Force's efforts to address the growing problem of illegal methamphetamine production in Tennessee. Specifically, the OIG was asked to evaluate the potential for certain chemicals to be stolen from Department of Energy (DOE) facilities in Oak Ridge, Tennessee, for possible use in the illicit production of methamphetamine. The Task Force has been aggressively trying to control the availability of methamphetamine precursor chemicals within its area of responsibility, which includes the region where DOE's Oak Ridge facilities

357

Inspection Report: IG-0769 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 Inspection Report: IG-0769 June 29, 2007 Management of the Workers Compensation Program at Department of Energy Headquarters The Federal Employees' Compensation Act (FECA) provides medical and salary benefits to Federal civilian employees who suffer work-related injuries or illnesses that prevent them from working. The FECA program pays for medical (and associated travel) expenses related to employees' injuries or diseases, provides wage compensation until they can return to work in either their original positions or a suitable alternative position, and covers vocational rehabilitation. The basic rate of compensation for injured employees with no dependents is 66.67 percent of gross wages, increasing to 75 percent if employees have one or more dependents. All

358

Inspection Report: IG-0703 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

703 703 Inspection Report: IG-0703 September 30, 2005 Characterization Wells at Los Alamos National Laboratory The Los Alamos National Laboratory (LANL), located on the Pajarito Plateau in Northern New Mexico, has been in operation since the early 1940's. LANL is a U.S. Department of Energy (DOE) research and development facility operated by the University of California. Throughout its history, LANL has conducted experimental research on the development of nuclear weapons and explosive materials that has resulted in the generation and disposal of a variety of hazardous, radioactive, and solid wastes. LANL has disposed of these wastes in septic systems, pits, surface impoundments, trenches, shafts, landfills, and waste piles at the facility. LANL has also discharged industrial wastewater and other waste into many of the canyons

359

Inspection Report: IG-0806 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

06 06 Inspection Report: IG-0806 November 25, 2008 40 MM Grenade Launcher Qualification Requirements at Department of Energy Sites The Department of Energy and its National Nuclear Security Administration (NNSA), operate some of the most sensitive Federal facilities in the United States. Because of the mission requirements, safeguards and security is a top priority at these sites. As part of its security regime, the Department maintains a cadre of armed protective force officers to prevent and defend against malevolent acts. In recent years, the Department has worked to enhance security by increasing the capabilities of weapon systems used by the protective force officers. One such weapon is the 40 mm grenade launcher, which utilizes high explosive ammunition to defeat adversary

360

Inspection Report: IG-0708 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

08 08 Inspection Report: IG-0708 November 9, 2005 Quality Assurance Weaknesses in the Review of Yucca Mountain Electronic Mail for Relevancy to the Licensing Process In 2002, Congress approved construction of a geological waste repository in Yucca Mountain, Nevada, to dispose of spent nuclear fuel and radioactive waste. Prior to construction, the Nuclear Regulatory Commission (NRC) must grant the Department of Energy (DOE) a license to build the facility. As part of the licensing process, DOE is required to publicly disclose all documents relevant to the licensing process, including electronic mail (e-mail), by posting them on DOE's public website. The website is accessible through the NRC-sponsored Licensing Support Network (LSN). The DOE Office of Civilian Radioactive Waste Management (OCRWM) is responsible

Note: This page contains sample records for the topic "roadside inspection wri" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Inspection Report: IG-0784 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

IG-0784 IG-0784 Inspection Report: IG-0784 December 19, 2007 The Department of Energy's Pandemic Influenza Planning According to the U. S. Centers for Disease Control and Prevention AND (CDC), in a worst case scenario, as many as 90 million people in the U.S., including 30 percent of its workforce, could become sick from a mutated avian influenza (bird flu) H5N1 strain. Proactive steps are therefore necessary to protect U.S. Department of Energy (DOE) personnel and maintain the Department's mission-essential functions. The Government issued mandates to Federal agencies to conduct pandemic influenza planning. On November 1, 2005, the President announced the "National Strategy for Pandemic Influenza," requiring Federal agencies that perform mission-critical functions, including DOE, to develop agency pandemic

362

Inspection Report: IG-0790 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 Inspection Report: IG-0790 March 21, 2008 Office of Intelligence andCounterintelligence Internal Controls Over the Department of Energy's Sensitive Compartmented InformationAccess Program The Department of Energy (DOE) is 1 of the 16 members of the AND OBJECTIVES U.S. Government's Intelligence Community and serves as the premier technical intelligence resource in the areas of nuclear weapons, nonproliferation, energy, science, and technology and emerging nuclear threats. In addition to providing intelligence analyses, DOE offers specialized technology development and operational support to both intelligence and law enforcement agencies. DOE accomplishes its intelligence mission by drawing from broad technical expertise located throughout the Department complex, including the National Laboratories, and

363

Inspection Report: IG-0717 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 Inspection Report: IG-0717 January 24, 2006 Electronic Recording of Telephone and Radio Conversations by Los Alamos National Laboratory Protective Force Management The Department of Energy's (DOE's) Los Alamos National AND OBJECTIVES Laboratory (LANL) is one of the largest multidisciplinary science institutions in the world. The primary national security missions of LANL are to help ensure the safety and reliability of the Nation's nuclear stockpile, prevent the spread of weapons of mass destruction, develop strategies to mitigate global threats, and protect the United States from terrorist attacks. LANL maintains a protective force that is trained and equipped to secure its facilities and operations. LANL is under the cognizance of the National Nuclear Security Administration (NNSA) and is

364

Inspection Report: IG-0654 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 Inspection Report: IG-0654 July 6, 2004 Unauthorized Handguns on National Nuclear Security Administration Aircraft The Office of Inspector General (OIG) received several allegations related to the transport of handguns by National Nuclear Security Administration (NNSA) affiliated personnel between Albuquerque, New Mexico, and Las Vegas, Nevada, where a training exercise involving NNSA's Office of Secure Transportation (OST) was to be held. One of the allegations was that on October 14, 2003, two employees of Wakehurst Servics, Inc., an NNSa contractor, transported handguns on board an NNSA aircraft ferrying Federal and contractor personnel from Albuquerque to Las Vegas for the exercise. NNSA has a fleet of aircraft that support the OST mission, and they are

365

Inspection Report: IG-0850 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

50 50 Inspection Report: IG-0850 April 15, 2011 Verification of Lawrence Berkeley National Laboratory's Contract Workers' Eligibility to Work in the U.S. The Department of Energy's Lawrence Berkeley National Laboratory (Berkeley) is a research laboratory managed by the Department's Berkeley Site Office (Site Office). Berkeley, operated under contract by the University of California, conducts unclassified research across a wide range of scientific disciplines, employing approximately 4,200 scientists, engineers, support staff and students. In addition to its Fiscal Year 2010 budget of approximately $707 million, Berkeley received an additional $104 million in funding from the American Recovery and Reinvestment Act of 2009 (Recovery Act). Much of this funding is being used in combination with

366

Inspection Report: IG-0724 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

24 24 Inspection Report: IG-0724 April 18, 2006 Badge Retrieval and Security Clearance Termination at Sandia National Laboratory-New Mexico The Department of Energy's (DOE's) Sandia National Laboratory-New Mexico (Sandia) is involved in a variety of research and development programs to enhance national security through technology. Sandia develops technologies to sustain, modernize, and protect the nuclear arsenal of the U.S., prevent the spread of weapons of mass destruction, defend against terrorism, protect national infrastructure, ensure stable energy and water supplies, and provide new capabilities to the armed forces. Sandia is administered by the National Nuclear Security Administration (NNSA) and is operated for NNSA by Sandia Corporation, a subsidiary of Lockheed Martin

367

Inspection Report: IG-0615 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 Inspection Report: IG-0615 August 11, 2003 Oversight of Shock Sensitive Chemicals at the Department's Ames Laboratory Shock sensitive chemicals, which are used throughout the Department of Energy (DOE) complex, have the potential to undergo a rapid reaction that can release relatively large amounts of energy that may be violent enough to produce an explosive detonation. Therefore, properly managing them is critical to ensuring the safety of personnel, as well as the protection of DOE assets. The U.S. Chemical Safety and Hazard Investigation Board reported that reactive chemicals, which include shock sensitive chemicals, have become a significant safety problem. According to the Board, between 1980 and 2002 there were 167 incidents nationally involving these chemicals

368

Inspection Report: IG-0591 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Inspection Report: IG-0591 March 20, 2003 Allegations Concerning the Reporting of a Radiological Incident at the Los Alamos National Laboratory On February 15, 2001, an unanticipated airborne release of Plutonium-238 (Pu-238) occurred from a glovebox at the Los Alamos National Laboratory (Los Alamos) Technical Area 55 (TA-55) Site. The incident resulted in the contamination of workers. As required, Los Alamos officials prepared an Occurrence Report outlining the circumstances of the incident. The National Nuclear Security Administration (NNSA) referred to the Ofice of Inspector General a complaint that questioned the thoroughness and competence of the evaluation of the incident by Los Alamos and the failure to consider the procedural violations that caused the incident. Consequently, the purpose

369

Inspection Report: IG-0694 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 Inspection Report: IG-0694 June 24, 2005 Protective Force Training at the Department of Energy's Oak Ridge Reservation The Department of Energy (DOE) mission at the Oak Ridge National Security Complex (Y-12), the Oak Ridge National Laboratory, East Tennessee Technology Park (ETTP), and the DOE Federal office complex, requires a paramilitary protective force comprised of several hundred security police officers to safeguard the production and storage of nuclear weapons components, special nuclear material, and other sensitive work. The force also includes a Special Response Team (SRT) at Y-12 comprised of specially trained officers who are responsible for engaging and defeating adversaries with advanced capabilities. The protective force is required to complete

370

Inspection Report: IG-0703 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 Inspection Report: IG-0703 September 30, 2005 Characterization Wells at Los Alamos National Laboratory The Los Alamos National Laboratory (LANL), located on the Pajarito Plateau in Northern New Mexico, has been in operation since the early 1940's. LANL is a U.S. Department of Energy (DOE) research and development facility operated by the University of California. Throughout its history, LANL has conducted experimental research on the development of nuclear weapons and explosive materials that has resulted in the generation and disposal of a variety of hazardous, radioactive, and solid wastes. LANL has disposed of these wastes in septic systems, pits, surface impoundments, trenches, shafts, landfills, and waste piles at the facility. LANL has also discharged industrial wastewater and other waste into many of the canyons

371

Inspection Report: IG-0859 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 Inspection Report: IG-0859 February 17, 2012 Property Accountability and Protection of Federal Sensitive Unclassified Information Under the Cooperative Agreement with the Incorporated County of Los Alamos On September 30, 2008, the National Nuclear Security Administration (NNSA) entered into a 5-year Cooperative Agreement with the County of Los Alamos. The Cooperative Agreement contained provisions for the management of Federally-owned personal property provided to the Los Alamos County Fire Department (Fire Department) by NNSA. In December 2010, the Office of Inspector General received a complaint alleging that Federal government property, including computers, was missing from the Fire Department. During our initial evaluation of this complaint, we also became aware that

372

Inspection of Used Fuel Dry Storage Casks  

SciTech Connect

ABSTRACT The U.S. Nuclear Regulatory Commission (NRC) regulates the storage of used nuclear fuel, which is now and will be increasingly placed in dry storage systems. Since a final disposition pathway is not defined, the fuel is expected to be maintained in dry storage well beyond the time frame originally intended. Due to knowledge gaps regarding the viability of current dry storage systems for long term use, efforts are underway to acquire the technical knowledge and tools required to understand the issues and verify the integrity of the dry storage system components. This report summarizes the initial efforts performed by researchers at Idaho National Laboratory and Argonne National Laboratory to identify and evaluate approaches to in-situ inspection dry storage casks. This task is complicated by the design of the current storage systems that severely restrict access to the casks.

Dennis C. Kunerth; Tim McJunkin; Mark McKay; Sasan Bakhtiari

2012-09-01T23:59:59.000Z

373

Inspection Report: IG-0754 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 Inspection Report: IG-0754 January 18, 2007 Sandia National Laboratory-California Procurement Card Program The mission of the Department of Energy's (DOE's) Sandia AND OBJECTIVE National Laboratory-California (Sandia-CA) includes applying advanced science and engineering to support the United States' deterrence policy by ensuring the nuclear weapons stockpile is safe, reducing the proliferation of weapons of mass destruction, and enhancing the surety of energy. Sandia-CA is managed by Lockheed Martin Corporation for the National Nuclear Security Administration (NNSA). Sandia-CA employs about 900 people. In support of its mission, Sandia-CA procures more than $40 million in goods and services annually. Employees at Sandia-CA have several procurement methods available to them, to include the Procurement Card

374

Inspection Report: IG-0794 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

IG-0794 IG-0794 Inspection Report: IG-0794 May 22, 2008 Office of Science Laboratory Conferences The Department of Energy's Office of Science manages ten major laboratories, comprising one of the most comprehensive research systems of its kind in the world. Office of Science entities hold a variety of conferences that bring together a broad range of scientists and researchers to present scientific results, discuss technologies, and expand collaboration. Federal and Department policies provide guidance on the use of Federal and non-Federal funds for conferences, with the objective of ensuring that conferences are managed in a cost effective manner. These policies include restrictions on the use of funds for items such as food, alcohol, and entertainment. Further, the Department requires that

375

Inspection Report: IG-0784 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

84 84 Inspection Report: IG-0784 December 19, 2007 The Department of Energy's Pandemic Influenza Planning According to the U. S. Centers for Disease Control and Prevention AND (CDC), in a worst case scenario, as many as 90 million people in the U.S., including 30 percent of its workforce, could become sick from a mutated avian influenza (bird flu) H5N1 strain. Proactive steps are therefore necessary to protect U.S. Department of Energy (DOE) personnel and maintain the Department's mission-essential functions. The Government issued mandates to Federal agencies to conduct pandemic influenza planning. On November 1, 2005, the President announced the "National Strategy for Pandemic Influenza," requiring Federal agencies that perform mission-critical functions, including DOE, to develop agency pandemic

376

Inspection Report: IG-0742 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Inspection Report: IG-0742 October 11, 2006 Protective Force Property Management at Lawrence Livermore National Laboratory The Department of Energy's (DOE's) Lawrence Livermore AND OBJECTIVE National Laboratory (LLNL) supports the maintenance of a safe, secure, and reliable nuclear weapon stockpile and provides expertise toward the prevention of the proliferation of weapons of mass destruction and terrorist attacks. LLNL is a National Nuclear Security Administration (NNSA) site operated by the University of California. In support of its core mission, Livermore maintains a protective force that is trained and equipped to secure its facilities and operations. For the past five years, the Laboratory's protective force has maintained a supply room that provides equipment required for Security Police Officers (SPOs) to carry

377

Inspection Report: IG-0780 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 Inspection Report: IG-0780 October 25, 2007 Work Order Estimate and Cost Issues for Site Support Services at Los AlamosNational Laboratory The Department of Energy's Los Alamos National Laboratory (LANL) is one of the largest multidisciplinary science institutions in the world. The National Nuclear Security Administration has cognizance over the Laboratory. Site support services at LANL, including maintenance and repairs, are provided by KSL Services Joint Venture (KSL) under a 5-year, almost $800 million, cost-plus-award-fee subcontract arrangement. Ultimately, essentially all KSL charges are reimbursed by the Department through the Laboratory. Under the terms of the subcontract, KSL is to excercise disciplne and rigor to ensure that appropriate levels of project

378

Vendor / Technology A  

NLE Websites -- All DOE Office Websites (Extended Search)

Kentucky WRI Pilot Test - Kentucky WRI Pilot Test - Universal ID Commercial Motor Vehicle Roadside Technology Corridor Safety Technology Showcase October 14, 2010 *Utilizes existing automated screening system *Uses assorted technologies to identify commercial vehicles, i.e., ALPR, USDOTR, DSRC *Commercial vehicles are screened for safety and credential violations *Automated screening system currently undergoing testing and evaluation Universal ID Pilot Test Kentucky Pilot Test Kentucky Pilot Test (Not to Scale) Sorter WIM USDOT Reader LPR Sorter Sign Screening Computer (in scale house) 2 nd LPR DSRC Reader Static scale Through lane >>>> Park/Proceed Signs Mainline >>>> Kentucky Pilot Test * Information is captured from the commercial vehicle,

379

B Plant treatment, storage, and disposal (TSD) units inspection plan  

Science Conference Proceedings (OSTI)

This inspection plan is written to meet the requirements of WAC 173-303 for operations of a TSD facility. Owners/operators of TSD facilities are required to inspection their facility and active waste management units to prevent and/or detect malfunctions, discharges and other conditions potentially hazardous to human health and the environment. A written plan detailing these inspection efforts must be maintained at the facility in accordance with Washington Administrative Code (WAC), Chapter 173-303, ``Dangerous Waste Regulations`` (WAC 173-303), a written inspection plan is required for the operation of a treatment, storage and disposal (TSD) facility and individual TSD units. B Plant is a permitted TSD facility currently operating under interim status with an approved Part A Permit. Various operational systems and locations within or under the control of B Plant have been permitted for waste management activities. Included are the following TSD units: Cell 4 Container Storage Area; B Plant Containment Building; Low Level Waste Tank System; Organic Waste Tank System; Neutralized Current Acid Waste (NCAW) Tank System; Low Level Waste Concentrator Tank System. This inspection plan complies with the requirements of WAC 173-303. It addresses both general TSD facility and TSD unit-specific inspection requirements. Sections on each of the TSD units provide a brief description of the system configuration and the permitted waste management activity, a summary of the inspection requirements, and details on the activities B Plant uses to maintain compliance with those requirements.

Beam, T.G.

1996-04-26T23:59:59.000Z

380

Double-shell tank ultrasonic inspection plan. Revision 1  

DOE Green Energy (OSTI)

The waste tank systems managed by the Tank Waste Remediation System Division of Westinghouse Hanford Company includes 28 large underground double-shell tanks (DST) used for storing hazardous radioactive waste. The ultrasonic (UT) inspection of these tanks is part of their required integrity assessment (WAC 1993) as described in the tank systems integrity assessment program plan (IAPP) (Pfluger 1994a) submitted to the Ecology Department of the State of Washington. Because these tanks hold radioactive waste and are located underground examinations and inspections must be done remotely from the tank annuli with specially designed equipment. This document describes the UT inspection system (DSTI system), the qualification of the equipment and procedures, field inspection readiness, DST inspections, and post-inspection activities. Although some of the equipment required development, the UT inspection technology itself is the commercially proven and available projection image scanning technique (P-scan). The final design verification of the DSTI system will be a performance test in the Hanford DST annulus mockup that includes the demonstration of detecting and sizing corrosion-induced flaws.

Pfluger, D.C.

1994-09-30T23:59:59.000Z

Note: This page contains sample records for the topic "roadside inspection wri" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Independent Oversight Inspection, Office of Science Pacific Northwest Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Science Pacific Office of Science Pacific Northwest Site Office and Pacific Northwest National Laboratory - November 2006 Independent Oversight Inspection, Office of Science Pacific Northwest Site Office and Pacific Northwest National Laboratory - November 2006 November 2006 Inspection of Classification and Information Control Programs at the Office of Science Pacific Northwest Site Office and Pacific Northwest National Laboratory This report presents the results of inspection activities by the Office of Independent Oversight's Office of Security Evaluations in the area of classification and information control (CIC) at the Office of Science (SC) Pacific Northwest Site Office (PNSO) and the Pacific Northwest National Laboratory (PNNL). The Office of Security Evaluations conducted this

382

Review of Section XI inservice inspection program effectiveness  

Science Conference Proceedings (OSTI)

To evaluate the effectiveness of Section XI, Division 1, {open_quotes}Rules for Inservice Inspection of Nuclear Power Plant Components,{close_quotes} of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, searches were performed of the Licensing Event Report and Nuclear Plant Reliability Data System computerized data bases, and a review was made of inservice inspection summary reports. It was found that the Section XI examinations and tests detect flaws in welds and plant components and result in subsequent corrective action. This study also shows that the format and topics of information provided in Section XI-prescribed inservice inspection summary reports vary widely.

Cook, J.F. Sr.

1993-08-01T23:59:59.000Z

383

Optical inspection system for cylindrical objects  

SciTech Connect

In the inspection of cylindrical objects, particularly O-rings, the object is translated through a field of view and a linear light trace is projected on its surface. An image of the light trace is projected on a mask, which has a size and shape corresponding to the size and shape which the image would have if the surface of the object were perfect. If there is a defect, light will pass the mask and be sensed by a detector positioned behind the mask. Preferably, two masks and associated detectors are used, one mask being convex to pass light when the light trace falls on a projection from the surface and the other concave, to pass light when the light trace falls on a depression in the surface. The light trace may be either dynamic, formed by a scanned laser beam, or static, formed by such a beam focussed by a cylindrical lens. Means are provided to automatically keep the illuminating receiving systems properly aligned.

Brenden, Byron B. (Richland, WA); Peters, Timothy J. (Richland, WA)

1989-01-01T23:59:59.000Z

384

On-Site Disposal Facility Inspection Report  

Office of Legacy Management (LM)

8947.1 8947.1 09/13 On-Site Disposal Facility Inspection Report September 2013 6319-D6242 8947.2 09/13 East Face Cell 1 West Face Cell 1 6319D-6208 6319D-6231 8947.3 09/13 North Face Cell 1 North Drainage (looking west) 6319D-6206 6319D-6205 8947.4 09/13 East Face Cell 2 West Face Cell 2 6319D-6230 6319D-6209 8947.5 09/13 East Face Cell 3 West Face Cell 3 6319D-6229 6319D-6210 8947.6 09/13 East Face Cell 4 West Face Cell 4 6319D-6227 6319D-62111 8947.7 09/13 East Face Cell 5 West Face Cell 5 6319D-6226 6319D-6213 8947.8 09/13 East Face Cell 6 6319D-6214 6319D-6225 West Face Cell 6 8947.9 09/13 East Face Cell 7 6319D-6215 6319D-6223 West Face Cell 7 8947.10 09/13 East Face Cell 8 6319D-6217 6319D-6220 West Face Cell 8 8947.11 09/13 South Face Cell 8 6319D-6219 6319D-6218 South Drainage (looking west) 8947.12 09/13

385

Independent Oversight Inspection, Nevada Test Site - June 2007 | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nevada Test Site - June 2007 Nevada Test Site - June 2007 Independent Oversight Inspection, Nevada Test Site - June 2007 June 2007 Inspection of Environment, Safety, and Health Programs at the Nevada Test Site The U.S. Department of Energy (DOE) Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), conducted an inspection of environment, safety, and health (ES&H) programs at the DOE Nevada Test Site (NTS) during March and April 2007. The ES&H inspection was performed by Independent Oversight's Office of Environment, Safety and Health Evaluations (HS-64). NSO has some adequate oversight program elements, such as the Facility Representative program, and in several cases NSO is effectively using contract performance measures to drive performance improvements. NSO has

386

Inspection Report: INS-0-99-02 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

INS-0-99-02 INS-0-99-02 Inspection Report: INS-0-99-02 July 9, 1999 Inspection of Lawrence Livermore National Laboratory Professional Research or Teaching Leave In March 1999, while conducting other Inspection work, the Department of Energy, Office of Inspector General determined that officials at the Lawrence Livermore National Laboratory (Livermore) had authorized and paid 24 months of "Professional Research or Teaching Leave" for two Livermore employees. These employees were research scholars at a local area university during this 24 month period. Professional Research or Teaching Leave is defined as leave to promote the continuing professional growth and competence of employees. Inspection Report: INS-0-99-02 More Documents & Publications Semiannual Report to Congress: April 1 - September 30, 1999

387

Independent Oversight Inspection, Hanford Site - February 2009 | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 2009 February 2009 Independent Oversight Inspection, Hanford Site - February 2009 February 2009 Inspection of Environment, Safety and Health Programs at the Hanford Site Waste Treatment and Immobilization Plant The U.S. Department of Energy (DOE) Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), inspected environment, safety, and health (ES&H) programs at the DOE Hanford Site Waste Treatment and Immobilization Plant (WTP) during October through November 2008. HSS reports directly to the Office of the Secretary of Energy, and the ES&H inspection was performed by Independent Oversight's Office of Environment, Safety and Health Evaluations. BNI has made significant improvements in nuclear safety processes, in part,

388

Independent Oversight Inspection, Los Alamos National Laboratory - November  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Los Alamos National Laboratory - Los Alamos National Laboratory - November 2005 Independent Oversight Inspection, Los Alamos National Laboratory - November 2005 Inspection of Environment, Safety, and Health Programs at the Los Alamos National Laboratory The U.S. Department of Energy (DOE) Office of Independent Oversight (Independent Oversight) conducted an inspection of environment, safety, and health (ES&H) programs at the DOE Los Alamos National Laboratory (LANL) during October and November 2005. The inspection was performed by Independent Oversight's Office of Environment, Safety and Health Evaluations. LASO and LANL have addressed the complex issues associated with EMS and CBDPP implementation. Although process weaknesses remain, many of the controls in place for high-hazard activities at the organizations that

389

CRAD, Safety Systems Inspection Criteria - December 17, 2012 | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Systems Inspection Criteria - December 17, 2012 Systems Inspection Criteria - December 17, 2012 CRAD, Safety Systems Inspection Criteria - December 17, 2012 December 17, 2012 Safety Systems Inspection Criteria in implementing Integrated Safety Management, (HSS CRAD 45-11, Rev. 3) The review of Safety Systems will evaluate the effectiveness of programs and processes for engineering design and safety basis, construction and installation, configuration management, surveillance testing, maintenance, operations, cognizant system engineer (CSE) and safety system oversight (SSO), and feedback and improvement of selected safety systems. The review will also evaluate the effectiveness in maintaining the functionality and reliability of these safety systems. The review of Safety Systems will be performed in the context of integrated safety management (ISM), although

390

Essential Systems Functionality Inspection Criteria, Approach, and Lines of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Essential Systems Functionality Inspection Criteria, Approach, and Essential Systems Functionality Inspection Criteria, Approach, and Lines of Inquiry, October 16, 2008 (HSS CRAD 64-11 Rev. 2) Essential Systems Functionality Inspection Criteria, Approach, and Lines of Inquiry, October 16, 2008 (HSS CRAD 64-11 Rev. 2) The Essential Systems Functionality (ESF) inspection will evaluate the effectiveness of programs and processes for engineering design and safety basis, construction and installation, configuration management, surveillance testing, maintenance, operations, cognizant system engineer (CSE) and safety system oversight (SSO), and feedback and improvement of selected safety systems. This review will evaluate the effectiveness in maintaining the functionality of these safety systems. The ESF review will be performed in the context of integrated safety management (ISM), although

391

Inspection of Environment, Safety, and Health Management at the Hanford  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Inspection of Environment, Safety, and Health Management at the Inspection of Environment, Safety, and Health Management at the Hanford Site, March 2002 Inspection of Environment, Safety, and Health Management at the Hanford Site, March 2002 The Secretary of Energy's Office of Independent Oversight and Performance Assurance (OA) conducted an inspection of environment, safety, and health (ES&H) management at the Department of Energy (DOE) Hanford Site in January-February 2002. Overall, RL and FHI have made significant improvements and established the framework for an effective ISM program. RL and FHI have provided leadership and devoted resources to ES&H programs and ISM, including innovative tools and aggressive efforts to address worker concerns. Section 2 provides an overall discussion of the results of the review of

392

Independent Oversight Inspection, Los Alamos National Laboratory - February  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Los Alamos National Laboratory - Los Alamos National Laboratory - February 2007 Independent Oversight Inspection, Los Alamos National Laboratory - February 2007 February 2007 Inspection of Emergency Management at the Los Alamos Site Office and Los Alamos National Laboratory The U.S. Department of Energy (DOE) Office of Independent Oversight inspected the emergency management program at DOE's Los Alamos Site Office (LASO) and Los Alamos National Laboratory (LANL) in October-November 2006. The inspection was performed as a joint effort by Independent Oversight's Office of Safeguards and Security Evaluations (HS-61), Office of Cyber Security (HS-62), and Office of Emergency Management Oversight (HS-63). This volume discusses the results of the review of the LASO and LANL emergency management programs.

393

Inspection Report: INS-0-99-02 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0-99-02 0-99-02 Inspection Report: INS-0-99-02 July 9, 1999 Inspection of Lawrence Livermore National Laboratory Professional Research or Teaching Leave In March 1999, while conducting other Inspection work, the Department of Energy, Office of Inspector General determined that officials at the Lawrence Livermore National Laboratory (Livermore) had authorized and paid 24 months of "Professional Research or Teaching Leave" for two Livermore employees. These employees were research scholars at a local area university during this 24 month period. Professional Research or Teaching Leave is defined as leave to promote the continuing professional growth and competence of employees. Inspection Report: INS-0-99-02 More Documents & Publications Semiannual Report to Congress: April 1 - September 30, 1999

394

Independent Oversight Inspection, Pantex Plant, Summary Report - November  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summary Report - Summary Report - November 2002 Independent Oversight Inspection, Pantex Plant, Summary Report - November 2002 November 2002 Inspection of Environment, Safety, and Health and Emergency Management at the Pantex Plant The Secretary of Energy's Office of Independent Oversight and Performance Assurance (OA) conducted an inspection of environment, safety, and health (ES&H) and emergency management programs at the National Nuclear Security Administration (NNSA) Pantex Plant in October and November 2002. The inspection was performed as a joint effort by the OA Office of Environment, Safety and Health Evaluations and the Office of Emergency Management Oversight. Overall, many aspects of the Pantex Plant ISM program are effective. Hazards analysis and controls for the highest hazard operations at the

395

Independent Oversight Inspection, Savannah River Site, Summary Report -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site, Summary Savannah River Site, Summary Report - February 2004 Independent Oversight Inspection, Savannah River Site, Summary Report - February 2004 February 2004 Inspection of Environment, Safety, and Health Management and Emergency Management at the Savannah River Site The Secretary of Energy's Office of Independent Oversight and Performance Assurance (OA) conducted an inspection of environment, safety, and health (ES&H) and emergency management programs at the U.S. Department of Energy's (DOE) Savannah River Site (SRS) in January and February 2004. The inspection was performed as a joint effort by the OA Office of Environment, Safety and Health Evaluations and the Office of Emergency Management Oversight. WSRC has implemented an emergency management program at SRS that exhibits

396

Independent Oversight Inspection, Sandia National Laboratories - May 2005 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 Independent Oversight Inspection, Sandia National Laboratories - May 2005 May 2005 Inspection of Emergency Management at the Sandia Site Office and Sandia National Laboratories, New Mexico, Volume III The Secretary of Energy's Office of Independent Oversight and Performance Assurance (OA), within the Office of Security and Safety Performance Assurance, inspected safeguards and security, cyber security, and emergency management programs at the U.S. Department of Energy (DOE) Sandia National Laboratories - New Mexico (SNL/NM) site in March and April 2005. The inspection was performed as a joint effort by the OA Office of Safeguards and Security Evaluations; Office of Cyber Security and Special Reviews; and Office of Emergency Management Oversight. This volume discusses the results

397

Independent Oversight Inspection, Los Alamos National Laboratory, Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Los Alamos National Laboratory, Los Alamos National Laboratory, Summary Report - April 2002 Independent Oversight Inspection, Los Alamos National Laboratory, Summary Report - April 2002 April 2002 Inspection of Environment, Safety, and Health and Emergency Management at the Los Alamos National Laboratory The Secretary of Energy's Office of Independent Oversight and Performance Assurance (OA) conducted an inspection of environment, safety, and health (ES&H) programs and emergency management programs at the U.S. Department of Energy (DOE) Los Alamos National Laboratory (LANL) in March-April 2002. The inspection was performed as a joint effort by the OA Office of Environment, Safety and Health Evaluations and the Office of Emergency Management Oversight. As discussed in this report, OLASO and LANL have made significant

398

Microsoft Word - Inspection of TRUPACT-III Changes.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

New Mexico 88221-3100 RE: NMED INSPECTION OF CHANGES TO PERMITTED FACILITY TO SUPPORT TRUPACT- III ACTIVITIES WASTE ISOLATION PILOT PLANT EPA I.D. NUMBER NM4890139088 Dear Messrs....

399

Appendix A Annual Inspection Checklist, Maps, and Photographs  

Office of Legacy Management (LM)

Annual Site Inspection 2012 Photos Photograph A1. Sign listing the institutional controls; posted at the west entrance road to the Central OU. Signs are posted at each of the...

400

Inspection Of Environment, Safety, And Health Management At The...  

NLE Websites -- All DOE Office Websites (Extended Search)

and criticality accident alarm systems in Building 9204-2E. The OA inspection team used a selective sampling approach to determine the effectiveness of YSO and BWXT in implementing...

Note: This page contains sample records for the topic "roadside inspection wri" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

MDC No. 096 Rev. D RECEIVING INSPECTION AND  

NLE Websites -- All DOE Office Websites (Extended Search)

Mechanical Visual inspection: RHIC-MAG-R-7536- 3.3.1.5 FUNCTION: APPROVAL (6) Seller's packaging. Part No., Revision letter, & Serial No. verified. Protective covers (2) are...

402

Uncertainty-driven view planning for underwater inspection  

E-Print Network (OSTI)

We discuss the problem of inspecting an underwater structure, such as a submerged ship hull, with an autonomous underwater vehicle (AUV). In such scenarios, the goal is to construct an accurate 3D model of the structure ...

Hollinger, Geoffrey A.

403

Independent Oversight Inspection, Savannah River Site - January 2010 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site - January Savannah River Site - January 2010 Independent Oversight Inspection, Savannah River Site - January 2010 January 2010 Inspection of Emergency Management at the Savannah River Site The U.S. Department of Energy (DOE) Office of Independent Oversight within the Office of Health, Safety and Security (HSS), inspected the emergency management program at the DOE Savannah River Site (SRS) in August and September 2009. The inspection was performed by the Office of Independent Oversight's Office of Emergency Management Oversight to support site management in the execution of the SRS mission. This report discusses the results of the review of the SRS emergency management program. Overall, SRS has implemented a mature, comprehensive, and well-documented emergency management program whose programmatic elements and site emergency

404

Rocket Slated for Removal Following Inspections | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rocket Slated for Removal Following Inspections Rocket Slated for Removal Following Inspections Rocket Slated for Removal Following Inspections April 29, 2013 - 12:00pm Addthis Though not linked to activities at Clean Slate III, the rocket is situated inside the historic testing location, identified for the plutonium dispersal test conducted under Operation Roller Coaster in June 1963. Though not linked to activities at Clean Slate III, the rocket is situated inside the historic testing location, identified for the plutonium dispersal test conducted under Operation Roller Coaster in June 1963. LAS VEGAS - Nevada Field Office and U.S. Air Force staff conducted inspections of a partially-buried rocket located at a historic testing location on the Tonopah Test Range (TTR) earlier this year. While the origin of the rocket and the time frame of its launch are

405

Independent Oversight Inspection, Y-12 National Security Complex - June  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Y-12 National Security Complex - Y-12 National Security Complex - June 2008 Independent Oversight Inspection, Y-12 National Security Complex - June 2008 June 2008 Inspection of Environment, Safety, and Health Programs at the Y-12 National Security Complex The U.S. Department of Energy (DOE) Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), inspected environment, safety, and health (ES&H) programs at the DOE Y-12 Site Office (YSO) and Y-12 National Security Complex (Y-12) during March through May 2008. The ES&H inspection was performed by Independent Oversight's Office of Environment, Safety and Health Evaluations. Many aspects of the Y-12 ISM program are effective. For example, most work observed was performed using well written and technically accurate

406

Independent Oversight Inspection, Savannah River Site Office - December  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Office - Savannah River Site Office - December 2009 Independent Oversight Inspection, Savannah River Site Office - December 2009 December 2009 Inspection of Nuclear Safety at the Savannah River Site Office and the Tritium Program Facilities The U.S. Department of Energy (DOE) Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), conducted an inspection of nuclear safety at several National Nuclear Security Administration (NNSA) facilities located at DOE's Savannah River Site (SRS) during August and September 2009. The inspection was performed by the Office of Independent Oversight's Office of Environment, Safety and Health Evaluations. With some isolated exceptions, the current SRNS nuclear safety programs and processes at the Tritium Program facilities are effective. Facility and

407

Guide to Optimized Nuclear Low-Pressure Turbine Rotor Inspection  

Science Conference Proceedings (OSTI)

In the past few years, the nuclear utility industry has reduced down-time for refueling outages to trim costs and improve overall unit performance. Consequently, this has also reduced the time available for other routine outage work and has often placed turbine maintenance and inspection tasks on the critical path. This report provides a review of the strategies several nuclear utilities have employed at their plants to reduce the time required to perform low-pressure turbine inspections. Included is a r...

1997-12-23T23:59:59.000Z

408

VINYL COATING OF GRAPHITE PLATES FOR ULTRASONIC INSPECTION  

SciTech Connect

A process has been developed for application of a thin, adherent vinyi plastic coating to graphite plates to prevent absorption of coupling fluids'' used in ultrasonic inspection. The plates are preheated and dipped mechanically in a fluid plastisol, and the resulting coating is fused in an infra-red heater. No significant attenuation of ultrasonic impulse results from presence of the coating. After inspection, the vinyl sheath may be easily stripped from the plate. (auth)

Church, J.S.; Bell, J.H. Jr.; Donahoe, J.K.; Faussone, R.A.; Rogers, G.B.; Rowen, J.T.

1958-03-25T23:59:59.000Z

409

Ultrasonic technique for inspection of GPHS capsule girth weld integrity  

DOE Green Energy (OSTI)

An innovative nondestructive examination (NDE) technique for the inspection of integrity of General Purpose Heat Source (GPHS) capsule girth welds (Figure 1) was developed employing a Lamb (plate) wave as the mode of the sound propagation. Reliability of the Lamb wave technique was tested on GPHS capsules using plutonium pallet simulators. All ten capsules, which were previously rejected, passed ultrasonic (UT) inspection using the Lamb wave technique.

Placr, Arnost

1993-05-01T23:59:59.000Z

410

New and Emerging Technologies for Inspection of Lattice Structures  

Science Conference Proceedings (OSTI)

As transmission systems age, many electric utilities have instituted programs to identify lattice structures that require condition-based maintenance and mitigation to extend their service lives. Electrochemical-based inspections provide an increasingly important role in monitoring corrosion in these structures and guiding mitigation and prevention strategies such as cathodic protection. This report briefly explains the thermodynamic principals that govern corrosion and electrochemical-based inspection m...

2011-12-16T23:59:59.000Z

411

Overhead Transmission Inspection, Assessment, and Asset Management Reference Guide - 2013  

Science Conference Proceedings (OSTI)

The emphasis within the transmission arena has shifted from designing and building new transmission facilities to optimizing the use, performance, and life of existing facilities. In the early 1990s, EPRI established an initiative to examine the capabilities and limitations of existing inspection and assessment methods and technology. One of the key needs identified was information on methods and technologies for inspecting/assessing the conditions ...

2013-12-22T23:59:59.000Z

412

An intelligent inspection and survey robot. Volume 1  

Science Conference Proceedings (OSTI)

ARIES {number_sign}1 (Autonomous Robotic Inspection Experimental System), has been developed for the Department of Energy to survey and inspect drums containing low-level radioactive waste stored in warehouses at DOE facilities. The drums are typically stacked four high and arranged in rows with three-foot aisle widths. The robot will navigate through the aisles and perform an inspection operation, typically performed by a human operator, making decisions about the condition of the drums and maintaining a database of pertinent information about each drum. A new version of the Cybermotion series of mobile robots is the base mobile vehicle for ARIES. The new Model K3A consists of an improved and enhanced mobile platform and a new turret that will permit turning around in a three-foot aisle. Advanced sonar and lidar systems were added to improve navigation in the narrow drum aisles. Onboard computer enhancements include a VMEbus computer system running the VxWorks real-time operating system. A graphical offboard supervisory UNIX workstation is used for high-level planning, control, monitoring, and reporting. A camera positioning system (CPS) includes primitive instructions for the robot to use in referencing and positioning the payload. The CPS retracts to a more compact position when traveling in the open warehouse. During inspection, the CPS extends up to deploy inspection packages at different heights on the four-drum stacks of 55-, 85-, and 110-gallon drums. The vision inspection module performs a visual inspection of the waste drums. This system will locate and identify each drum, locate any unique visual features, characterize relevant surface features of interest and update a data-base containing the inspection data.

NONE

1995-12-15T23:59:59.000Z

413

Independent Oversight Inspection, Waste Isolation Pilot Plant, Summary Report- August 2002  

Energy.gov (U.S. Department of Energy (DOE))

Inspection of Environment, Safety, and Health and Emergency Management at the Waste Isolation Pilot Plant

414

DOE G 430.1-1 Chp 25, Guidelines for Engineering, Design, and Inspection Costs  

Directives, Delegations, and Requirements

This chapter addresses engineering, design, and inspection activities that begin with preliminary design (Title I).

1997-03-28T23:59:59.000Z

415

Principal component analysis based on wavelet characteristics applied to automated surface defect inspection  

Science Conference Proceedings (OSTI)

Automated visual inspection, a crucial manufacturing step, has been replacing the more time-consuming and less accurate human inspection. This research explores automated visual inspection of surface defects in a light-emitting diode (LED) chip. Commonly ... Keywords: hotelling statistic, machine vision system, principal component analysis, surface defect inspection, wavelet characteristics

Hong-Dar Lin; Chung-Yu Chung; Wan-Ting Lin

2008-04-01T23:59:59.000Z

416

Independent Oversight Inspection, Y-12 National Security Complex, Volume I- September 2005  

Energy.gov (U.S. Department of Energy (DOE))

Inspection of Environment, Safety, and Health Programs at the Y-12 National Security Complex, Summary Report

417

SUBJECT: PILGRIM NUCLEAR POWER STATION- NRC INTEGRATED INSPECTION  

E-Print Network (OSTI)

your Pilgrim reactor facility. The enclosed integrated inspection report documents the inspection findings, which were discussed on July 7, 2005, with Mr T. Kirwin and members of your staff. The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. On the basis of the results of this inspection, no findings of significance were identified. After this inspection period ended, the NRC issued a letter on July 14, 2005, issuing a Severity Level III Notice of Violation and Proposed Imposition of Civil Penalty. This inspection report acknowledges issuance of that letter and assigns a tracking number for the Severity Level III Notice of Violation. Additionally, licensee-identified violations which were determined to be of very low safety significance are listed in Section 4OA7 of this report. If you contest any NCV in this report, you should provide a response with the basis for your denial, within 30 days of the

Mr. Michael; A. Balduzzi; Pilgrim Nuclear; Power Station

2005-01-01T23:59:59.000Z

418

Built-in-test by signature inspection (bitsi)  

DOE Patents (OSTI)

A system and method for fault detection for electronic circuits. A stimulus generator sends a signal to the input of the circuit under test. Signature inspection logic compares the resultant signal from test nodes on the circuit to an expected signal. If the signals do not match, the signature inspection logic sends a signal to the control logic for indication of fault detection in the circuit. A data input multiplexer between the test nodes of the circuit under test and the signature inspection logic can provide for identification of the specific node at fault by the signature inspection logic. Control logic responsive to the signature inspection logic conveys information about fault detection for use in determining the condition of the circuit. When used in conjunction with a system test controller, the built-in test by signature inspection system and method can be used to poll a plurality of circuits automatically and continuous for faults and record the results of such polling in the system test controller.

Bergeson, Gary C. (Idaho Falls, ID); Morneau, Richard A. (Idaho Falls, ID)

1991-01-01T23:59:59.000Z

419

Built-in-test by signature inspection (BITSI)  

DOE Patents (OSTI)

A system and method for fault detection for electronic circuits. A stimulus generator sends a signal to the input of the circuit under test. Signature inspection logic compares the resultant signal from test nodes on the circuit to an expected signal. If the signals do not match, the signature inspection logic sends a signal to the control logic for indication of fault detection in the circuit. A data input multiplexer between the test nodes of the circuit under test and the signature inspection logic can provide for identification of the specific node at fault by the signature inspection logic. Control logic responsive to the signature inspection logic conveys information about fault detection for use in determining the condition of the circuit. When used in conjunction with a system test controller, the built-in test by signature inspection system and method can be used to poll a plurality of circuits automatically and continuous for faults and record the results of such polling in the system test controller. 10 figs., 3 tabs.

Bergeson, G.C.; Morneau, R.A.

1989-03-27T23:59:59.000Z

420

Inspection Report REPORT ON INSPECTION REGARDINGSMALL BUSINESS CONTRACTING STATISTICS REPORTING ANDPRESENTATION, INS-O-98-02  

Energy.gov (U.S. Department of Energy (DOE))

During this inspection, we sought to determine if the Office of Economic Impact and Diversity: 1. Issued the annual Report to Congress on the Small Business Program for FY 1993, FY 1994, and FY...

Note: This page contains sample records for the topic "roadside inspection wri" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Licensee contractor and vendor and vendor inspection status report. Quarterly report, July 1995--September 1995  

Science Conference Proceedings (OSTI)

This periodical covers the results of inspections performed by the NRC`s Special Inspection Branch, Vendor Inspection Section, that have been distributed to the inspected organizations during the period from July 1995 through September 1995. Vendors inspected include: (1) Continental Disc Corporation, (2) Divesco, (3) Eaton, (4) General Electric Nuclear Energy, (5) ITT Barton, (6) Liberty Technologies, (7) Mid-South Nuclear, (8) Power Distribution Services, (9) Rosemount, (10) Target-Rock, and (11) Westinghouse Electric.

NONE

1995-12-01T23:59:59.000Z

422

SECTION 109 INSPECTIONS 109.1 General. Construction or work for which a permit is required shall be subject to inspection by the  

E-Print Network (OSTI)

inspection. Shall at a minimum include the following building components: Dry-in Insulation Roof coverings be subject to inspection by the building official and such construction or work shall remain accessible to cause the work to remain accessible and exposed for inspection purposes. Neither the building official

Hoffman, Eric

423

Inspection of compressed natural gas cylinders on school buses  

DOE Green Energy (OSTI)

The US Department of Energy (DOE) is sponsoring compressed natural gas (CNF)-powered school bus demonstrations in various locations around the country. Early in 1994, two non-DOE-sponsored CNG pickup trucks equipped with composite-reinforced-aluminum fuel cylinders experienced cylinder ruptures during refueling. As reported by the Gas Research Institute (GRI): ...analysis of the cylinder ruptures on the pickup trucks revealed that they were due to acid-induced stress corrosion cracking (SCC) of the overwrap. The overwrap that GRI refers to is a resin-impregnated fiber that is wrapped around the outside of the gas cylinder for added strength. Because ensuring the safety of the CNG vehicles it sponsors is of paramount concern to DOE, the Department, through the National Renewable Energy Laboratory (NREL), conducted inspections of DOE-sponsored vehicles nationwide. The work had three objectives: inspection, documentation, and education. First, inspectors visited sites where CNG-powered school buses sponsored by DOE are based, and inspected the CNG cylinders for damage. Second, information learned during the inspections was collected for DOE. Third, the inspections found that the education and awareness of site personnel, in terms of cylinder damage detection, needed to be increased.

NONE

1995-07-01T23:59:59.000Z

424

Evaluations of Structural Failure Probabilities and Candidate Inservice Inspection Programs  

SciTech Connect

The work described in this report applies probabilistic structural mechanics models to predict the reliability of nuclear pressure boundary components. These same models are then applied to evaluate the effectiveness of alternative programs for inservice inspection to reduce these failure probabilities. Results of the calculations support the development and implementation of risk-informed inservice inspection of piping and vessels. Studies have specifically addressed the potential benefits of ultrasonic inspections to reduce failure probabilities associated with fatigue crack growth and stress-corrosion cracking. Parametric calculations were performed with the computer code pc-PRAISE to generate an extensive set of plots to cover a wide range of pipe wall thicknesses, cyclic operating stresses, and inspection strategies. The studies have also addressed critical inputs to fracture mechanics calculations such as the parameters that characterize the number and sizes of fabrication flaws in piping welds. Other calculations quantify uncertainties associated with the inputs calculations, the uncertainties in the fracture mechanics models, and the uncertainties in the resulting calculated failure probabilities. A final set of calculations address the effects of flaw sizing errors on the effectiveness of inservice inspection programs.

Khaleel, Mohammad A.; Simonen, Fredric A.

2009-05-01T23:59:59.000Z

425

Capacity Utilization Study for Aviation Security Cargo Inspection Queuing System  

SciTech Connect

In this paper, we conduct performance evaluation study for an aviation security cargo inspection queuing system for material flow and accountability. The queuing model employed in our study is based on discrete-event simulation and processes various types of cargo simultaneously. Onsite measurements are collected in an airport facility to validate the queuing model. The overall performance of the aviation security cargo inspection system is computed, analyzed, and optimized for the different system dynamics. Various performance measures are considered such as system capacity, residual capacity, throughput, capacity utilization, subscribed capacity utilization, resources capacity utilization, subscribed resources capacity utilization, and number of cargo pieces (or pallets) in the different queues. These metrics are performance indicators of the system s ability to service current needs and response capacity to additional requests. We studied and analyzed different scenarios by changing various model parameters such as number of pieces per pallet, number of TSA inspectors and ATS personnel, number of forklifts, number of explosives trace detection (ETD) and explosives detection system (EDS) inspection machines, inspection modality distribution, alarm rate, and cargo closeout time. The increased physical understanding resulting from execution of the queuing model utilizing these vetted performance measures should reduce the overall cost and shipping delays associated with new inspection requirements.

Allgood, Glenn O [ORNL; Olama, Mohammed M [ORNL; Lake, Joe E [ORNL; Brumback, Daryl L [ORNL

2010-01-01T23:59:59.000Z

426

2009 Annual Inspection and Status Report for the  

Office of Legacy Management (LM)

Hallam, Nebraska Hallam, Nebraska May 2013 Page 1 2013 Annual Inspection and Status Report for the Hallam, Nebraska, Decommissioned Reactor Site Summary The former Hallam Nuclear Power Facility (HNPF) was inspected on May 1, 2013. The IHX building and the grass cover on the foundation of the former reactor building, were in good condition. No cause for a follow-up inspection was identified. There are 19 groundwater monitoring wells at the Hallam site. Four of the 19 wells are flush mount in design and are locked using a special tool. The other 15 wells require a pad lock. It was reported in June 2012, as the wells were being sampled, that the pad locks were hard to work and needed to be replaced. All of the 15 wells requiring pad locks received a new lock during the

427

Independent Oversight Inspection, Chicago Office and Argonne National  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chicago Office and Argonne Chicago Office and Argonne National Laboratory - September 2006 Independent Oversight Inspection, Chicago Office and Argonne National Laboratory - September 2006 September 2006 Independent Oversight Inspection of Classification and Information Control Programs at the Chicago Office and Argonne National Laboratory This report presents the results of inspection activities by the Office of Independent Oversight's Office of Security Evaluations in the area of classification and information control (CIC) at the Office of Science (SC) Chicago Office (CH), the Argonne Site Office, and the Argonne National Laboratory (ANL). To ensure a thorough evaluation, the subtopic areas of program administration, authorities, guidance, training, document reviews, and program evaluation were assessed. The data collection activities were

428

Inspection of Emergency Management at the Waste Isolation Pilot Plant -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Emergency Management at the Waste Isolation Pilot Emergency Management at the Waste Isolation Pilot Plant - Volume II, August 2002 Inspection of Emergency Management at the Waste Isolation Pilot Plant - Volume II, August 2002 The Secretary of Energy's Office of Independent Oversight and Performance Assurance (OA) conducted an inspection of environment, safety, and health and emergency management programs at the U.S. Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) in July and August 2002. The inspection was performed as a joint effort by the OA Office of Environment, Safety and Health Evaluations and the Office of Emergency Management Oversight. This volume discusses the results of the review of the WIPP emergency management program. The results of the review of the WIPP environment, safety, and

429

Inspection of Environment, Safety, and Health Management at the Waste  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environment, Safety, and Health Management at the Environment, Safety, and Health Management at the Waste Isolation Pilot Plant - Volume I, August 2002 Inspection of Environment, Safety, and Health Management at the Waste Isolation Pilot Plant - Volume I, August 2002 The Secretary of Energy's Office of Independent Oversight and Performance Assurance (OA) conducted an inspection of environment, safety, and health (ES&H) and emergency management programs at the Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) in July and August 2002. The inspection was performed as a joint effort by the OA Office of Environment, Safety and Health Evaluations and the Office of Emergency Management Oversight. This volume discusses the results of the review of the WIPP ES&H programs. The results of the review of the WIPP emergency management program are

430

Inspection of Emergency Management Programs at the Argonne National  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Emergency Management Programs at the Argonne National Emergency Management Programs at the Argonne National Laboratory - East, Volume II, May 2002 Inspection of Emergency Management Programs at the Argonne National Laboratory - East, Volume II, May 2002 The Secretary of Energy's Office of Independent Oversight and Performance Assurance (OA) conducted an inspection of environment, safety, and health and emergency management programs at the Department of Energy's (DOE) Argonne National Laboratory - East (ANL-E) in April and May 2002. The OA Office of Environment, Safety and Health Evaluations and the Office of Emergency Management Oversight performed the inspection as a joint effort. This volume discusses the results of the review of the ANL-E emergency management program. The results of the review of the ANL-E environment,

431

Waste Treatment Facility Passes Federal Inspection, Completes Final  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waste Treatment Facility Passes Federal Inspection, Completes Final Waste Treatment Facility Passes Federal Inspection, Completes Final Milestone, Begins Startup Waste Treatment Facility Passes Federal Inspection, Completes Final Milestone, Begins Startup April 23, 2012 - 12:00pm Addthis Media Contact Erik Simpson, 208-390-9464 Danielle Miller, 208-526-5709 The Idaho site today initiated the controlled, phased startup of a new waste treatment facility scheduled to begin treating 900,000 gallons of radioactive liquid waste stored in underground tanks at a former Cold War spent nuclear fuel reprocessing facility next month. A U.S. Department of Energy (DOE) operational readiness review team (made up of Subject Matter Experts across the country) in early April identified a dozen issues for the cleanup contractor CH2M-WG Idaho, LLC (CWI) to

432

Independent Oversight Inspection, Richland Operations Office, Office of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Richland Operations Office, Richland Operations Office, Office of River Protection, and Project Hanford Management Contract - November 2006 Independent Oversight Inspection, Richland Operations Office, Office of River Protection, and Project Hanford Management Contract - November 2006 November 2006 Inspection of Classification and Information Control Programs at the Richland Operations Office, Office of River Protection, and Project Hanford Management Contract This report presents the results of inspection activities by the U.S. Department of Energy (DOE) Office of Independent Oversight, Office of Security Evaluations in the area of classification and information control (CIC) at the two DOE offices at the Hanford Site-the Richland Operations Office (RL) and the Office of River Protection (ORP)-each of which

433

Inspection technologies protect and enhance materials for power plants  

NLE Websites -- All DOE Office Websites (Extended Search)

Inspection technologies protect and enhance materials for power plants Inspection technologies protect and enhance materials for power plants Director's Welcome Organization Achievements Highlights Fact Sheets, Brochures & Other Documents Multimedia Library About Nuclear Energy Nuclear Reactors Designed by Argonne Argonne's Nuclear Science and Technology Legacy Opportunities within NE Division Visit Argonne Work with Argonne Contact us For Employees Site Map Help Join us on Facebook Follow us on Twitter NE on Flickr Celebrating the 70th Anniversary of Chicago Pile 1 (CP-1) Argonne OutLoud on Nuclear Energy Argonne Energy Showcase 2012 Highlights Bookmark and Share Inspection technologies protect and enhance materials for power plants A researcher makes thermal images of ceramic defects THERMAL IMAGING - Julian Benz uses Argonne's thermal imaging system

434

Microsoft Word - Inspections Subgroup Minutes_040606_Draft.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3/2006 1 3/2006 1 TEC Rail Topic Group, Inspections Subgroup Conference Call Thursday, April 6, 2006 2:00 p.m. to 3:00 p.m. CST Group Co-Chairs: Tim Runyon (State of Illinois) and Carlisle Smith (State of Ohio) Participants: Kevin Blackwell (DOT), Scott Field (WIEB), Pat Brady (Burlington Northern Santa Fe), Jay Jones (DOE), and Sarah Wochos (CSG). DOE support contractors also participated on the call. Action Items: Responsible Party Action to be Taken Tim Runyon & Sarah Consult with state representatives about creating a Wochos template for mechanical and Hazmat inspection procedures. Prepare a draft procedure. Speak to Bob Fronczak about crew change points Carlisle Smith Provide contact information for State of Ohio personnel that could assist in preparing a template for inspections

435

Microsoft Word - Inspections Subgroup Minutes_012406_Final _2_.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Inspections Subgroup Conference Call Inspections Subgroup Conference Call DRAFT Tuesday, January 24, 2006 3:00 p.m. to 4:00 p.m. EST Group Co-Chairs: Tim Runyon (State of Illinois) and Carlisle Smith (State of Ohio) Participants: Lisa Janairo (CSG), Brent Kiser (State of Ohio), Scott Field (WIEB), Kevin Blackwell (DOT), Jule Fausto (State of Utah), Sandy Covi (Union Pacific), Cort Richardson (CSG), Pat Brady (Burlington Northern Santa Fe) DOE Support contractors also participated on the call. Action Items: Responsible Party Action to be Taken All: Send written comments on work scope to Lisa Janairo by February 3. Lisa Janairo: Distribute old TEC documents on rail/CVSA comparison. Distribute DOE order that addresses rail inspections (per Sandy's suggestion).

436

CRAD, Performance-Based Inspection - November 29, 2011 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 29, 2011 November 29, 2011 CRAD, Performance-Based Inspection - November 29, 2011 November 20, 2011 Performance-Based Inspection of Environmental Management Systems: Inspection Criteria, approach, and Lines of Inquiry (HSS CRAD 45-38, Rev. 1) The following provides an overview of the typical activities that will be performed to collect information to evaluate the effectiveness of the environmental management system. Several terms used throughout this document are defined (last three terms based on ISO 14001 :2004(E) Section 3, Terms and Definitions) as follows: The term "activities" encompasses various types of projects including construction, restoration, maintenance, operations, research and development (R&D), and other work activities that could expose the workers,

437

Independent Oversight Inspection, Chicago Office and Argonne National  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chicago Office and Argonne Chicago Office and Argonne National Laboratory - September 2006 Independent Oversight Inspection, Chicago Office and Argonne National Laboratory - September 2006 September 2006 Independent Oversight Inspection of Classification and Information Control Programs at the Chicago Office and Argonne National Laboratory This report presents the results of inspection activities by the Office of Independent Oversight's Office of Security Evaluations in the area of classification and information control (CIC) at the Office of Science (SC) Chicago Office (CH), the Argonne Site Office, and the Argonne National Laboratory (ANL). To ensure a thorough evaluation, the subtopic areas of program administration, authorities, guidance, training, document reviews, and program evaluation were assessed. The data collection activities were

438

Microsoft Word - Appendix H - InspectionChecklist.doc  

Office of Legacy Management (LM)

H H Annual Inspection Checklist U.S. Department of Energy Weldon Spring Site LTS&M Plan July 2005 Doc. No. S0079000 Page H-3 Annual Site Inspection Checklist Purpose of the Checklist This checklist has been developed from the EPA guidance document Comprehensive Five Year Review Guidance dated June 2001 (OSWER No. 9355.7-03B-P) and from Section 2.3 of the Long-Term Surveillance and Maintenance Plan for the Weldon Spring, Missouri, Site. The checklist was modified to site-specific conditions as recommended by the guidance document. The checklist will be completed annually during the Weldon Spring Site annual surveillance and maintenance inspection. The checklist will also be used to assist in compiling information for the five-year review.

439

Agile Machining and Inspection Non-Nuclear Report (NNR) Project  

SciTech Connect

This report is a high level summary of the eight major projects funded by the Agile Machining and Inspection Non-Nuclear Readiness (NNR) project (FY06.0422.3.04.R1). The largest project of the group is the Rapid Response project in which the six major sub categories are summarized. This project focused on the operations of the machining departments that will comprise Special Applications Machining (SAM) in the Kansas City Responsive Infrastructure Manufacturing & Sourcing (KCRIMS) project. This project was aimed at upgrading older machine tools, developing new inspection tools, eliminating Classified Removable Electronic Media (CREM) in the handling of classified Numerical Control (NC) programs by installing the CRONOS network, and developing methods to automatically load Coordinated-Measuring Machine (CMM) inspection data into bomb books and product score cards. Finally, the project personnel leaned perations of some of the machine tool cells, and now have the model to continue this activity.

Lazarus, Lloyd

2009-02-19T23:59:59.000Z

440

Uncertainty Budget Analysis for Dimensional Inspection Processes (U)  

SciTech Connect

This paper is intended to provide guidance and describe how to prepare an uncertainty analysis of a dimensional inspection process through the utilization of an uncertainty budget analysis. The uncertainty analysis is stated in the same methodology as that of the ISO GUM standard for calibration and testing. There is a specific distinction between how Type A and Type B uncertainty analysis is used in a general and specific process. All theory and applications are utilized to represent both a generalized approach to estimating measurement uncertainty and how to report and present these estimations for dimensional measurements in a dimensional inspection process. The analysis of this uncertainty budget shows that a well-controlled dimensional inspection process produces a conservative process uncertainty, which can be attributed to the necessary assumptions in place for best possible results.

Valdez, Lucas M. [Los Alamos National Laboratory

2012-07-26T23:59:59.000Z

Note: This page contains sample records for the topic "roadside inspection wri" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Robotics for waste storage inspection: A user`s perspective  

SciTech Connect

Self-navigating robotic vehicles are now commercially available, and the technology supporting other important system components has also matured. Higher reliability and the obtainability of system support now make it practical to consider robotics as a way of addressing the growing operational requirement for the periodic inspection and maintenance of radioactive, hazardous, and mixed waste inventories. This paper describes preparations for the first field deployment of an autonomous container inspection robot at a Department of Energy (DOE) site. The Stored Waste Autonomous Mobile Inspector (SWAMI) is presently being completed by engineers at the Savannah River Technology Center (SRTC). It is a modified version of a commercially available robot. It has been outfitted with sensor suites and cognition that allow it to perform inspections of drum inventories and their storage facilities.

Hazen, F.B.

1994-06-23T23:59:59.000Z

442

Independent Oversight Inspection, Nevada Test Site - September 2004 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nevada Test Site - September 2004 Nevada Test Site - September 2004 Independent Oversight Inspection, Nevada Test Site - September 2004 September 2004 Security and Emergency Management Pilot Integrated Performance Tests at the Nevada Test Site The Secretary of Energy's Office of Independent Oversight and Performance Assurance (OA), within the Office of Security and Safety Performance Assurance, conducted an inspection of safeguards and security and emergency management programs at the U.S. Department of Energy's (DOE) Nevada Test Site (NTS) in July and August 2004. The inspection was performed as a joint effort by the OA Office of Safeguards and Security Evaluations and Office of Emergency Management Oversight. This report discusses the observations related to the emergency management objectives for these two performance

443

Licensee contractor and vendor inspection status report. Quarterly progress report, April 1996--June 1996  

Science Conference Proceedings (OSTI)

The federal government and nuclear industry have established a system for the inspection of commercial nuclear facilities to provide for multiple levels of inspection and verification. The Vendor Inspection System (VIS) of the Special Inspection Branch reviews and inspects the quality and suitability of vendor products, licensee-vendor interface, environmental qualification of equipment, and review of equipment problems found during operation and their corrective action. This report contains copies of all vendor inspection reports issued during the calendar year for which it is published.

NONE

1996-08-01T23:59:59.000Z

444

Inspection Report - Management of Explosives at Selected Department Sites  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management of Explosives at Selected Management of Explosives at Selected Department Sites INS-O-12-02 July 2012 Department of Energy Washington, DC 20585 July 2, 2012 MEMORANDUM FOR THE CHIEF HEALTH, SAFETY AND SECURITY OFFICER MANAGER, IDAHO OPERATIONS OFFICE MANAGER, SAVANNAH RIVER SITE MANAGER, SANDIA SITE OFFICE MANAGER, LOS ALAMOS SITE OFFICE FROM: Sandra D. Bruce Assistant Inspector General for Inspections Office of Inspector General SUBJECT: INFORMATION: Inspection Report on "Management of Explosives at Selected Department Sites" INTRODUCTION AND OBJECTIVE In support of its research and development mission and security of its facilities, the Department of Energy maintains a significant inventory of explosives. In terms of mission, the Department

445

Remote Inspection Devices for Spent Reactor Enriched Uranium Fuel Elements  

SciTech Connect

A remote video inspection was developed and deployed in Argentina for the detailed inspection of highly radioactive spent reactor fuel (SNF) as a prerequisite to its shipment to the Savannah River Site (SRS) in the United States for long-term storage and disposition. The fuel is highly enriched uranium (HEU) spent assemblies dating from 1967 to 1989 and aluminum clad uranium-aluminum alloy of a typical material test reactor design. The specialized video system was designed for low cost, high portability, easy setup, and ease of usage, while accommodating the differing electrical systems (i.e. 110/60 Hz, 220/50 Hz) between the United States and Argentina.

Heckendorn, F.M.

2001-01-03T23:59:59.000Z

446

B Plant complex treatment, storage, and disposal units inspection plan  

Science Conference Proceedings (OSTI)

Owners or operators of facilities that treat, store, and/or dispose of dangerous waste and/or mixed waste as defined by WAC 173-303, {open_quotes}Dangerous Waste Regulations,{close_quotes} must inspect their facilities to prevent malfunctions and deteriorations, operator errors, and discharges that may cause or lead to the release of hazardous waste constituents to the environment and/or cause a threat to human health. The WAC regulations require a written inspection schedule be developed, implemented, and kept at the facility.

Beam, T.G.

1994-10-01T23:59:59.000Z

447

Inspection apparatus for evaluating a partially completed weld  

SciTech Connect

An inspection apparatus for evaluating a partially completed weld is described and which is utilized in combination with an automated movable welder which moves across a supporting surface, and wherein the inspection apparatus includes a coupling member mounted on the welder; a frame member mounted on the coupling member; an ultrasonic sensor mounted on the frame member and disposed in ultrasonic sound transmitting relation relative to the partially completed weld; and a drive assembly for adjusting the position of the ultrasonic sensor relative to the partially completed weld.

Smartt, Herschel B. (Idaho Falls, ID); Larsen, Eric D. (Idaho Falls, ID); Johnson, Jonn A. (Idaho Falls, ID)

2001-01-01T23:59:59.000Z

448

Automatic inspection system for nuclear fuel pellets or rods  

DOE Patents (OSTI)

An automatic inspection system is provided for determining surface defects on cylindrical objects such as nuclear fuel pellets or rods. The active element of the system is a compound ring having a plurality of pneumatic jet units directed into a central bore. These jet units are connected to provide multiple circuits, each circuit being provided with a pressure sensor. The outputs of the sensors are fed to a comparator circuit whereby a signal is generated when the difference of pressure between pneumatic circuits, caused by a defect, exceeds a pre-set amount. This signal may be used to divert the piece being inspected into a "reject" storage bin or the like.

Miller, Jr., William H. (Oak Ridge, TN); Sease, John D. (Knoxville, TN); Hamel, William R. (Concord, TN); Bradley, Ronnie A. (Oak Ridge, TN)

1978-01-01T23:59:59.000Z

449

Pulse-echo ultrasonic inspection system for in-situ nondestructive inspection of Space Shuttle RCC heat shields.  

SciTech Connect

The reinforced carbon-carbon (RCC) heat shield components on the Space Shuttle's wings must withstand harsh atmospheric reentry environments where the wing leading edge can reach temperatures of 3,000 F. Potential damage includes impact damage, micro cracks, oxidation in the silicon carbide-to-carbon-carbon layers, and interlaminar disbonds. Since accumulated damage in the thick, carbon-carbon and silicon-carbide layers of the heat shields can lead to catastrophic failure of the Shuttle's heat protection system, it was essential for NASA to institute an accurate health monitoring program. NASA's goal was to obtain turnkey inspection systems that could certify the integrity of the Shuttle heat shields prior to each mission. Because of the possibility of damaging the heat shields during removal, the NDI devices must be deployed without removing the leading edge panels from the wing. Recently, NASA selected a multi-method approach for inspecting the wing leading edge which includes eddy current, thermography, and ultrasonics. The complementary superposition of these three inspection techniques produces a rigorous Orbiter certification process that can reliably detect the array of flaws expected in the Shuttle's heat shields. Sandia Labs produced an in-situ ultrasonic inspection method while NASA Langley developed the eddy current and thermographic techniques. An extensive validation process, including blind inspections monitored by NASA officials, demonstrated the ability of these inspection systems to meet the accuracy, sensitivity, and reliability requirements. This report presents the ultrasonic NDI development process and the final hardware configuration. The work included the use of flight hardware and scrap heat shield panels to discover and overcome the obstacles associated with damage detection in the RCC material. Optimum combinations of custom ultrasonic probes and data analyses were merged with the inspection procedures needed to properly survey the heat shield panels. System features were introduced to minimize the potential for human factors errors in identifying and locating the flaws. The in-situ NDI team completed the transfer of this technology to NASA and USA employees so that they can complete 'Return-to-Flight' certification inspections on all Shuttle Orbiters prior to each launch.

Roach, Dennis Patrick; Walkington, Phillip D.; Rackow, Kirk A.

2005-06-01T23:59:59.000Z

450

Independent Oversight Inspection of Emergency Management at the Hanford Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hanford Site Hanford Site August 2001 Washington, DC 20585 i INDEPENDENT OVERSIGHT INSPECTION OF EMERGENCY MANAGEMENT AT THE HANFORD SITE VOLUME III Table of Contents Acronyms .....................................................................................................................................................................iii 1.0 Introduction ...........................................................................................................................................................1 2.0 Results ...................................................................................................................................................................3 3.0 Conclusions............................................................................................................................................

451

Periodic Inspections of Concrete-Armored Coastal Structures  

E-Print Network (OSTI)

information on the long-term structural performance of selected concrete-armored navigation structures to their environment. Inspections of coastal structures at Ofu Harbor, American Samoa; Nawiliwili, Laupahoehoe, and Kahului Harbors, HI; and Manasquan Inlet, NJ, are discussed herein. The response of stone-armored coastal structures to their environment was presented in ERDC/CHL CHETN-III-65. OVERVIEW: In the Periodic Inspections work unit of the Monitoring Completed Navigation Projects (MCNP) Program, selected coastal navigation structures are periodically monitored to gain an understanding of their long-term structural response. Periodic data sets are evaluated to improve knowledge in design, construction, and maintenance of both existing and proposed coastal navigation projects, and will help avoid repeating past designs that have failed and/or resulted in high maintenance costs. Low-cost remote sensing tools and techniques, with limited ground truthing surveys, are the primary inspection tools used in the periodic monitoring efforts. Most periodic inspections consist of capturing above-water conditions of the structures at periodic intervals using high-resolution aerial photography. Structural changes (primary armor unit movement) are quantified through photogrammetric techniques. When a coastal structure is photographed at low

Robert R. Bottin

2003-01-01T23:59:59.000Z

452

Effective Conveyor Belt Inspection for Improved Mining Productivity  

SciTech Connect

This document details progress on the project entitled ''Effective Conveyor Belt Inspection for Improved Mining Productivity'' during the period from November 15, 2004 to May 14, 2004. Highlights include fabrication of an improved LED lightbar, fabrication of a line-scan sensor head for the Smart-Camera based prototype, and development of prototype vulcanized splice detection algorithms.

Chris Fromme

2006-06-01T23:59:59.000Z

453

Nondestructive inspection of General Purpose Heat Source (GPHS) girth welds  

SciTech Connect

The General-Purpose Heat Source (GPHS) provides power for space missions by transmitting the heat of {sup 238}Pu decay to an array of thermoelectric elements. The GPHS is fabricated using iridium capsules, TIG welded, to contain the {sup 238}PuO{sub 2} fuel pellet. GPHS capsules will be utilized in the upcoming Cassini mission to explore Saturn and its moons. The physical integrity of the girth weld is important to mission safety and performance. Since experience in the past had revealed a potential for initiation of small cracks in the girth weld overlap zone, a nondestructive inspection of the capsule weld is required. A ultrasonic method was used to inspect the welds of capsules fabricated for the Galileo mission. The instrument, transducer, and method used were state of the art at the time (early 1980s). The ultrasonic instrumentation and methods used to inspect the Cassini GPHSs was significantly upgraded from those used for the Galileo mission. GPHSs that had ultrasonic reflectors that exceeded the reject specification level were subsequently inspected with radiography to provide additional engineering data used to accept/reject the heat source. This paper describes the Galileo-era ultrasonic instrumentation and methods and the subsequent upgrades made to support testing of Cassini GPHSs. Also discussed is the data obtained from radiographic examination and correlation to ultrasonic examination results.

Reimus, M.A.H.; George, T.G.; Lynch, C. [and others

1998-12-31T23:59:59.000Z

454

Status of the Prototype Pulsed Photonuclear Assessment (PPA) Inspection System  

SciTech Connect

Prototype Photonuclear Inspection Technology An Integrated Systems Approach* James L. Jonesa, Daren R. Normana, Kevin J. Haskella, James W. Sterbentza, Woo Y. Yoona, Scott M. Watsona, James T. Johnsona, John M. Zabriskiea, Calvin E. Mossb, Frank Harmonc a Idaho National Laboratory, P.O. Box 1625-2802, Idaho Falls, Idaho 83415-2802 b Los Alamos National Laboratory, P.O. Box 1663, MS B228, Los Alamos, New Mexico, 87585 c Idaho State University, 1500 Alvin Ricken Dr., Pocatello, Idaho 83201 Active interrogation technologies are being pursued in order to address many of todays challenging inspection requirements related to both nuclear and non-nuclear material detection. The Idaho National Laboratory, along with the Los Alamos National Laboratory and the Idaho State Universitys Idaho Accelerator Center, continue to develop electron accelerator-based, photonuclear inspection technologies for the detection of shielded nuclear material within air-, rail-, and especially, maritime-cargo containers. This paper presents an overview and status of the prototype Pulsed Photonuclear Assessment (PPA) inspection system and its ability to detect shielded nuclear material by focusing on the integration of three major detection system components: delayed neutron measurement, delayed gamma-ray measurements, and a transmission, gray-scale mapping for shield material detection. Areas of future development and advancement within each detection component will be presented. *Supported in part by the Department of Homeland Security under DOE-ID Contract Number DE-AC07-99ID13727. POC: James L. Jones, 208-526-1730

Prototype Photonuclear Inspection Technoloby - An

2007-08-01T23:59:59.000Z

455

Effective Conveyor Belt Inspection for Improved Mining Productivity  

SciTech Connect

This document details progress on the project entitled ''Effective Conveyor Belt Inspection for Improved Mining Productivity'' during the period from November 15, 2004 to May 14, 2004. Highlights include fabrication of an improved LED lightbar, fabrication of a line-scan sensor head for the Smart-Camera based prototype, and development of prototype vulcanized splice detection algorithms.

Chris Fromme

2006-06-01T23:59:59.000Z

456

Ally: OS-Transparent Packet Inspection Using Sequestered Cores  

Science Conference Proceedings (OSTI)

This paper presents Ally, a server platform architecture that supports compute-intensive management services on multi-core processors. Ally introduces simple hardware mechanisms to sequester cores to run a separate software environment dedicated to management ... Keywords: multicore, packet inspection, isolation, computer architecture, multicore partitioning

Jen-Cheng Huang; Matteo Monchiero; Yoshio Turner; Hsien-Hsin S. Lee

2011-10-01T23:59:59.000Z

457

International inspection activity impacts upon DOE safeguards requirements  

SciTech Connect

The US has placed certain special nuclear materials declared excess to their strategic needs under international safeguards through the International Atomic Energy Agency (IAEA). This Presidential initiative has obligated materials at several Department of Energy (DOE) facilities for these safeguards activities to demonstrate the willingness of the US to ban production or use of nuclear materials outside of international safeguards. However, IAEA inspection activities generally tend to be intrusive in nature and are not consistent with several domestic safeguards procedures implemented to reduce worker radiation exposures and increase the cost-effectiveness and efficiency of accounting for and storing of special nuclear materials. To help identify and provide workable solutions to these concerns, the Office of Safeguards and Security has conducted a program to determine possible changes to the DOE safeguards and security requirements designed to help facilities under international safeguards inspections more easily comply with domestic safeguards goals during international inspection activities. This paper will discuss the impact of international inspection activities on facility safeguards operations and departmental safeguards procedures and policies.

Zack, N.R. [Los Alamos National Lab., NM (United States). Safeguards Systems Group; Crawford, D.W. [USDOE Office of Safeguards and Security, Washington, DC (United States)

1995-09-01T23:59:59.000Z

458

UAV Path Planning for Structure Inspection in Windy Environments  

Science Conference Proceedings (OSTI)

In this paper, we consider the structure inspection problem using a miniature unmanned aerial vehicle (UAV). The influence of the wind on the UAV behavior and onboard energy limitations are important parameters that must be taken into account in the ... Keywords: Path planning, Traveling salesman problem, Vehicle routing problem, Zermelo navigation

Jose Alfredo Guerrero; Yasmina Bestaoui

2013-01-01T23:59:59.000Z

459

Guidelines for Prioritizing Inspections of Aging Plant Infrastructure  

Science Conference Proceedings (OSTI)

This report outlines an approach that utilities can employ when prioritizing the inspections and testing of infrastructure at fossil power plants. The equipment and systems considered in this report include cabling, piping, tanks, building structures, chimneys, railways, and related infrastructure. The report also provides information on assessment methods suitable for evaluating these infrastructure systems.

2012-03-29T23:59:59.000Z

460

Apparatus for the concurrent inspection of partially completed welds  

DOE Patents (OSTI)

An apparatus for the concurrent inspection of partially completed welds is described in which is utilized in combination with a moveable welder for forming a partially completed weld, and an ultrasonic generator mounted on a moveable welder in which is reciprocally moveable along a path of travel which is laterally disposed relative to the partially completed weld.

Smartt, Herschel B. (Idaho Falls, ID); Johnson, John A. (Idaho Falls, ID); Larsen, Eric D. (Idaho Falls, ID); Bitsoi, Rodney J. (Ririe, ID); Perrenoud, Ben C. (Rigby, ID); Miller, Karen S. (Idaho Falls, ID); Pace, David P. (Idaho Falls, ID)

2002-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "roadside inspection wri" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Microsoft PowerPoint - 2009.10.27 Bridge Inspection Follow-up  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bridge Inspection Status Bridge Inspection Status Cindy Hunt, P.E., LEED AP Facilities Engineer Office of Engineering and Construction Management U. S. Department of Energy October 27, 2009 Status of Operating Assets June 2009 October 2009 Compliant Inspection Date Compliant Inspection Date No Inspection Date All Vehicle Bridges 44% 65% 21% - Public Access 67% 44% 44% Train Bridges 50% 75% 25% All Pedestrian Bridges 43% 67% 0% - Public Access 100% 100% 0% 2 DOE Inventory: 60 Assets Vehicle Bridges: 43 (34 controlled, 9 public) Train Bridges: 5 controlled Pedestrian Bridges: 12 (7 controlled, 5 public) 3 What's Coming Next * FIMS change to provide Usage Codes for publically accessible bridges * FIMS change to provide Safety Inspection Date for all bridges * Programs complete necessary inspections, update usage codes and populate inspection dates

462

Inspection Report: INS-O-00-01 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Inspection Report: INS-O-00-01 November 30, 1999 Inspection of Selected issues of the Chem-Bio facility at the Oak Ridge National Laboratory The Department is seeking to...

463

POST-CLOSURE INSPECTION REPORT FOR THE TONOPAH TEST RANGE, NEVADA FOR CALENDAR YEAR 2005  

SciTech Connect

This post-closure inspection report includes the results of inspections, maintenance and repair activities, and conclusions and recommendations for Calendar Year 2005 for nine Corrective Action Units located on the Tonopah Test Range , Nevada.

NONE

2006-06-01T23:59:59.000Z

464

Tonopah Test Range Post-Closure Inspection Annual Report, Tonopah Test Range, Nevada, Calendar Year 2003  

Science Conference Proceedings (OSTI)

This post-closure inspection report provides documentation of the semiannual inspection activities, maintenance and repair activities, and conclusions and recommendations for calendar year 2003 for eight corrective action units located on the Tonopah Test Range, Nevada.

U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Bechtel Nevada

2004-04-01T23:59:59.000Z

465

Report on Inspection of Compliance With DOE Order 2030.4B at...  

NLE Websites -- All DOE Office Websites (Extended Search)

Report on Inspection of Compliance With DOE Order 2030.4B at the Savannah River Site, INS-9702 Report on Inspection of Compliance With DOE Order 2030.4B at the Savannah River Site,...

466

Inspection Report: INS-O-13-03 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

3 Inspection Report: INS-O-13-03 March 20, 2013 Inspection Report - Radiological Waste Operations in Area G at Los Alamos National Laboratory Los Alamos National Laboratory (Los...

467

Post-Closure Inspection Letter Report for Corrective Action Units on the Nevada National Security Site  

SciTech Connect

This letter serves as the post-closure inspection letter report for corrective action units on the Nevada National Security Site for calendar year 2011. Copies of completed inspection checklists are included in this report.

NSTec Environmental Restoration

2011-05-26T23:59:59.000Z

468

Smart Infrared Inspection System Field Operational Test Final Report  

SciTech Connect

The Smart InfraRed Inspection System (SIRIS) is a tool designed to assist inspectors in determining which vehicles passing through the SIRIS system are in need of further inspection by measuring the thermal data from the wheel components. As a vehicle enters the system, infrared cameras on the road measure temperatures of the brakes, tires, and wheel bearings on both wheel ends of commercial motor vehicles (CMVs) in motion. This thermal data is then presented to enforcement personal inside of the inspection station on a user friendly interface. Vehicles that are suspected to have a violation are automatically alerted to the enforcement staff. The main goal of the SIRIS field operational test (FOT) was to collect data to evaluate the performance of the prototype system and determine the viability of such a system being used for commercial motor vehicle enforcement. From March 2010 to September 2010, ORNL facilitated the SIRIS FOT at the Greene County Inspection Station (IS) in Greeneville, Tennessee. During the course of the FOT, 413 CMVs were given a North American Standard (NAS) Level-1 inspection. Of those 413 CMVs, 384 were subjected to a SIRIS screening. A total of 36 (9.38%) of the vehicles were flagged by SIRIS as having one or more thermal issues; with brakes issues making up 33 (91.67%) of those. Of the 36 vehicles flagged as having thermal issues, 31 (86.11%) were found to have a violation and 30 (83.33%) of those vehicles were placed out-of-service (OOS). Overall the enforcement personnel who have used SIRIS for screening purposes have had positive feedback on the potential of SIRIS. With improvements in detection algorithms and stability, the system will be beneficial to the CMV enforcement community and increase overall trooper productivity by accurately identifying a higher percentage of CMVs to be placed OOS with minimal error. No future evaluation of SIRIS has been deemed necessary and specifications for a production system will soon be drafted.

Siekmann, Adam [ORNL; Capps, Gary J [ORNL; Franzese, Oscar [ORNL; Lascurain, Mary Beth [ORNL

2011-06-01T23:59:59.000Z

469

EPRI Phased Array Performance Demonstration for Axial Entry Blade Attachment Inspection - Technical Update  

Science Conference Proceedings (OSTI)

The disk rim blade attachment area is one of the most highly stressed components of the steam turbine rotor. Reliable and accurate inspection of the disk rim blade attachment area is essential for the determination of rotor operability and remaining life. The purpose of the Electric Power Research Institute's (EPRI's) Phased Array Performance Demonstration for Axial Entry Blade Attachment Inspection Project is to determine the inspection performance levels of commercial entities offering these inspection...

2008-12-22T23:59:59.000Z

470

Nondestructive Evaluation: Remote Field Technology Assessment for Piping Inspection Including Buried and Limited Access Components  

Science Conference Proceedings (OSTI)

This document provides results for the following projects: 1. Remote Field Technology Assessment for Piping Inspection 2. Inspection Techniques and NDE for Buried and Limited-Access Components 3. Guideline Development for Above-Ground, Below-Ground, and Limited-Access Storage Vessel Inspection These projects provided the Electric Power Research Institute (EPRI) the opportunity to engage its membership and several vendors in identifying remote field technology for piping inspection and advanced NDE inspec...

2010-11-19T23:59:59.000Z

471

Fuel Reliability Program: Global Nuclear Fuel Priority 1 Fuel Inspections Results Assessment Report  

Science Conference Proceedings (OSTI)

In an effort to meet the recommendations of the Electric Power Research Institute (EPRI) report 1015032, Fuel Reliability Guidelines: Fuel Surveillance and Inspection, Global Nuclear Fuel (GNF) worked with the Fuel Reliability Program (FRP) and utilities to assign an inspection prioritization ranking to the GNF-fueled U.S. BWR fleet and conducted and completed a series of fuel inspections from 2007 to 2009 at the highest priority plants. Summary presentations of the inspection results were presented at E...

2011-05-12T23:59:59.000Z

472

Overhead Transmission Line Inspection - Online Training (OTLOT) Version 9.0  

Science Conference Proceedings (OSTI)

The EPRI Overhead Transmission Line Inspection - Online Training is a CD-based application for training on how to complete overhead transmission line inspections.It contains fourteen modules of instruction on overhead transmission line inspections. A browser interface helps the user navigate through the interactive training. As the user moves through the module, it provides instruction, application practice, and review questions.Benefits & ...

2013-12-16T23:59:59.000Z

473

Inspection of selected intelligence and special access program work-for-others projects  

Science Conference Proceedings (OSTI)

At the request of the former Secretary, an inspection of six classified intelligence and special access program work-for-others projects was conducted. The purpose of this inspection was to evaluate managements, effectiveness regarding these work-for-others projects and included tests for financial integrity and adherence to applicable laws and regulations. Details of the inspection are provided in this report.

Not Available

1993-10-08T23:59:59.000Z

474

Survey paper: Computer-Aided Inspection Planning-The state of the art  

Science Conference Proceedings (OSTI)

Computer-Aided Inspection Planning (CAIP) has been a research topic for the past 25 years. Most of the CAIP systems were developed for Coordinate Measuring Machines (CMMs). The authors reviewed these CAIP systems and categorized them into two groups: ... Keywords: Computer-Aided Inspection Planning (CAIP), Integration, On-Machine Inspection (OMI), STEP-NC

Fiona Zhao; Xun Xu; S. Q. Xie

2009-09-01T23:59:59.000Z

475

Materials Reliability Program: Effects of Surface Peening on the Inspectability of Nondestructive Evaluation  

Science Conference Proceedings (OSTI)

To study emerging component repair and mitigation techniques and their potential effects on applied nondestructive evaluation (NDE), the Electric Power Research Institute (EPRI) Materials Reliability Program inspection technical advisory committee funded a multiyear project, which began in 2010. This report investigates the effects of various peening processes on routine applications of NDE inspection techniques.BackgroundAn inspection plan will be part of ...

2013-11-26T23:59:59.000Z

476

PRE-SW EPRI Overhead Transmission Line Inspection - Online Training (OTLOT) Version 9.0, Beta  

Science Conference Proceedings (OSTI)

The EPRI Overhead Transmission Line Inspection - Online Training is a CD-based application for training on how to complete overhead transmission line inspections.Itcontains fourteen modules of instruction on overhead transmission line inspections. A browser interface helps the user navigate through the interactive training. As the user moves through the module, it provides instruction, application practice, and review questions.Benefits ...

2013-08-25T23:59:59.000Z

477

Interim Guidelines for In Situ Visual Inspection of Inlet and Outlet Turbine Stages: Part 2: Experiences, Approaches and Improvement s in Remote Visual Inspection  

Science Conference Proceedings (OSTI)

In situ inspection of steam turbine rotors will minimize the length of planned outages by reducing the amount of equipment disassembly required. This interim report provides a state-of-the-art review of in situ visual inspection of steam turbine rotors, also known as remote visual inspection (RVI). The report also proposes an approach for the next phase of this project, which will promote not only application of RVI technology but also delivery of advanced nondestructive evaluation (NDE) equipment to cri...

2000-05-22T23:59:59.000Z

478

EMAT based inspection of natural gas pipelines for SSC cracks  

NLE Websites -- All DOE Office Websites (Extended Search)

EMAT-Based Inspection of Natural Gas EMAT-Based Inspection of Natural Gas Pipelines for Stress Corrosion Cracks FY2004 Report Venugopal K. Varma, Raymond W. Tucker, Jr., and Austin P. Albright Oak Ridge National Laboratory Oak Ridge, Tennessee 37831 1 This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name,

479

NETL: News Release - Robot Successfully Inspects Live Natural Gas Pipeline  

NLE Websites -- All DOE Office Websites (Extended Search)

22, 2004 22, 2004 Robot Successfully Inspects Live Natural Gas Pipeline in New York Field Test is a First for Natural Gas Industry BROCKPORT, NY - In a recent field demonstration filled with "firsts," a self-powered robot developed by the Northeast Gas Association, Carnegie Mellon University, and the Department of Energy's National Energy Technology Laboratory successfully inspected a mile of a live natural gas distribution main in Brockport, New York. Known as EXPLORER, the remote-controlled robot was launched and retrieved four times on October 8 with no interruption in customer service. The system successfully made its way through an 8-inch diameter pipeline owned and operated by Rochester Electric & Gas, and maneuvered several 70- to 90-degree bends.

480

Microsoft Word - Inspections Subgroup Minutes_022306_Draft _2_.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- 5/3/2006 Page 1 - 5/3/2006 Page 1 TEC Rail Topic Group, Inspections Subgroup Conference Call Thursday, February 23, 2006 2:00 p.m. to 3:30 p.m. CST DRAFT Group Co-Chairs: Tim Runyon (State of Illinois) and Carlisle Smith (State of Ohio) Participants: Lisa Janairo (CSG), Kevin Blackwell (DOT), Brent Kiser (State of Ohio), Scott Field (WIEB), Cort Richardson (CSG), Pat Brady (Burlington Northern Santa Fe), Rick Hand (State of Illinois) Action Items: Responsible Party Action to be Taken All Participants Provide comments on draft inspection questions to Lisa Janairo by March 1, 2006. Kevin Blackwell Distribute a copy of the updated April 2000 legal memo from FRA defining inspector authorities. Distribute list of FRA-certified state inspectors.

Note: This page contains sample records for the topic "roadside inspection wri" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Automated robotic equipment for ultrasonic inspection of pressurizer heater wells  

DOE Patents (OSTI)

A robotic device for remotely inspecting pressurizer heater wells is provided which has the advantages of quickly, precisely, and reliably acquiring data at reasonable cost while also reducing radiation exposure of an operator. The device comprises a prober assembly including a probe which enters a heater well, gathers data regarding the condition of the heater well and transmits a signal carrying that data; a mounting device for mounting the probe assembly at the opening of the heater well so that the probe can enter the heater well; a first motor mounted on the mounting device for providing movement of the probe assembly in an axial direction; and a second motor mounted on the mounting device for providing rotation of the probe assembly. This arrangement enables full inspection of the heater well to be carried out.

Nachbar, Henry D. (Ballston Lake, NY); DeRossi, Raymond S. (Amsterdam, NY); Mullins, Lawrence E. (Middle Grove, NY)

1993-01-01T23:59:59.000Z

482

Review of High Level Waste Tanks Ultrasonic Inspection Data  

SciTech Connect

A review of the data collected during ultrasonic inspection of the Type I high level waste tanks has been completed. The data was analyzed for relevance to the possibility of vapor space corrosion and liquid/air interface corrosion. The review of the Type I tank UT inspection data has confirmed that the vapor space general corrosion is not an unusually aggressive phenomena and correlates well with predicted corrosion rates for steel exposed to bulk solution. The corrosion rates are seen to decrease with time as expected. The review of the temperature data did not reveal any obvious correlations between high temperatures and the occurrences of leaks. The complex nature of temperature-humidity interaction, particularly with respect to vapor corrosion requires further understanding to infer any correlation. The review of the waste level data also did not reveal any obvious correlations.

Wiersma, B

2006-03-09T23:59:59.000Z

483

Automated robotic equipment for ultrasonic inspection of pressurizer heater wells  

DOE Patents (OSTI)

A robotic device for remotely inspecting pressurizer heater wells is provided which has the advantages of quickly, precisely, and reliably acquiring data at reasonable cost while also reducing radiation exposure of an operator. The device comprises a probe assembly including a probe which enters a heater well, gathers data regarding the condition of the heater well and transmits a signal carrying that data; a mounting device for mounting the probe assembly at the opening of the heater well so that the probe can enter the heater well; a first motor mounted on the mounting device for providing movement of the probe assembly in an axial direction; and a second motor mounted on the mounting device for providing rotation of the probe assembly. This arrangement enables full inspection of the heater well to be carried out.

Nachbar, H.D.; DeRossi, R.S.; Mullins, L.E.

1991-12-31T23:59:59.000Z

484

Standard Practice for Visual Inspections of Photovoltaic Modules  

E-Print Network (OSTI)

1.1 This practice covers procedures and criteria for visual inspections of photovoltaic modules. 1.2 Visual inspections of photovoltaic modules are normally performed before and after modules have been subjected to environmental, electrical, or mechanical stress testing, such as thermal cycling, humidity-freeze cycling, damp heat exposure, ultraviolet exposure, mechanical loading, hail impact testing, outdoor exposure, or other stress testing that may be part of photovoltaic module testing sequence. 1.3 This practice does not establish pass or fail levels. The determination of acceptable or unacceptable results is beyond the scope of this practice. 1.4 There is no similar or equivalent ISO standard. 1.5 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.

American Society for Testing and Materials. Philadelphia

2008-01-01T23:59:59.000Z

485

Method for the concurrent ultrasonic inspection of partially completed welds  

DOE Patents (OSTI)

A method for the concurrent ultrasonic inspection of partially completed welds is disclosed and which includes providing a pair of transducers which are individually positioned on the opposite sides of a partially completed weld to be inspected; moving the transducers along the length of and laterally inwardly and outwardly relative to the partially completed weld; pulsing the respective transducers to produce an ultrasonic signal which passes through or is reflected from the partially completed weld; receiving from the respective transducers ultrasonic signals which pass through or are reflected from the partially completed welds; and analyzing the ultrasonic signal which has passed through or is reflected from the partially completed weld to determine the presence of any weld defects.

Johnson, John A. (Idaho Falls, ID); Larsen, Eric D. (Idaho Falls, ID); Miller, Karen S. (Idaho Falls, ID); Smartt, Herschel B. (Idaho Falls, ID); McJunkin, Timothy R. (Idaho Falls, ID)

2002-01-01T23:59:59.000Z

486

Microsoft Word - Fixed Ladder and Step-Ladder Inspection Checklist.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

Ladder Inspections Ladder Inspections Due to recent information, lessons learned, and accident reports from across the DOE complex, emphasis needs to be placed on the importance of inspecting ladders, both portable and fixed. Portable ladders should be inspected prior to each use to ensure they are in good working order. Portable ladders can be damaged during use, handling, moving, and storage, which can render the ladder unsafe for use. Recent information from the DOE complex has shown unsafe conditions that may be found during proper pre- use ladder inspections. All portable ladders with any damage or defect must be removed from service. (Photos 1 and 2) Attachment 1 is a provided as a guideline for portable ladder inspections. Fixed Ladders should be inspected on a routine basis, especially when installed (re-