Powered by Deep Web Technologies
Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Infrared Thermometry in Winter Road Maintenance  

Science Conference Proceedings (OSTI)

There is significant interest among road authorities in measuring pavement conditions to perform appropriate winter road maintenance. The most common monitoring methods are based on pavement-mounted sensors. This study’s hypothesis is that the ...

Patrik Jonsson; Mats Riehm

2012-06-01T23:59:59.000Z

2

An Automated Nowcasting Model of Road Surface Temperature and State for Winter Road Maintenance  

Science Conference Proceedings (OSTI)

Winter road maintenance is an important application field of meteorology in western and northern Europe, North America, and many other parts of the world. In order to provide timely short-period high-accuracy forecasts of road surface temperature ...

J. Shao; P. J. Lister

1996-08-01T23:59:59.000Z

3

Curecanti-Blue Mesa-Salida 115-kV transmission lines access roads rehabilitation, maintenance, and construction project. Environmental Assessment  

SciTech Connect

Western Area Power Administration (Western) is a power marketing agency of the US Department of Energy, with jurisdiction in 15 western states. The Salt Lake City Area (SLCA) of Western performs the agency`s mission in parts of Colorado, New Mexico, Texas, Utah, Arizona, Wyoming, and Nevada. As part of its mission, Western owns, operates, and maintains a system of transmission lines for transmitting bulk electrical energy from points of generation to and between delivery points. Part of that system in southwestern Colorado includes the Blue Mesa-Curecanti and Blue Mesa-Salida 115-kV transmission lines. Western proposes to conduct maintenance and improve its access roads for these two transmission lines. This paper discusses the impacts to the existing environment as well as the environmental consequences resulting from the maintenance and construction that is proposed.

Not Available

1993-07-01T23:59:59.000Z

4

West Valley Demonstration Project 10282 Rock Springs Road  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

West Valley Demonstration Project West Valley Demonstration Project 10282 Rock Springs Road West Valley, NY 141 71 -9799 Mr. Daniel W. Coyne President & General Manager CH2M HILL B&W West Valley, LLC West Valley Demonstration Project 10282 Rock Springs Road West Valley, NY 141 71 -9799 ATTENTION: J. D. Rendall, Regulatory Strategy, AC-EA SUBJECT: Environmental Checklist WVDP-20 12-0 1, " WVDP Reservoir Interconnecting Canal Maintenance Activities" REFERENCE: Letter WD:2012:0409 (357953), D. W. Coyne to R. W. Reffner, "CONTRACT NO. DE-EM000 1529, Section 5-3, Item 105, NEPA Documentation (Transmittal of Environmental Checklist WVDP-20 12-0 1, WVDP Reservoir Interconnecting Canal Maintenance Activities), Revision 1 ," dated July 24, 20 12 Dear Mr. Coyne:

5

Microsoft Word - FINAL Contact Record 2012-01 Roads Maintenance  

Office of Legacy Management (LM)

RFLMA Contact Record 2012-01 page 1 of 6 RFLMA Contact Record 2012-01 page 1 of 6 ROCKY FLATS SITE REGULATORY CONTACT RECORD Purpose: Soil Disturbance Review Plan-Roads maintenance, including grading the road to the former A-3 Pond to convert the road to two-track vehicle use. Contact Record Approval Date: May 31, 2012 Site Contact(s)/Affiliation(s): Scott Surovchak, U.S. Department of Energy (DOE); Gwen Hooton, DOE; Rick DiSalvo, S.M. Stoller Corporation (Stoller); Kurt Franzen, Stoller; Linda Kaiser, Stoller Regulatory Contact(s)/Affiliation(s): Carl Spreng, Colorado Department of Public Health and Environment (CDPHE); Vera Moritz, U.S. Environmental Protection Agency (EPA) Date of Consultation Meeting: May 24, 2012 Consultation Meeting Participants: Carl Spreng, CDPHE; Scott Surovchak, DOE;

6

Hampton Roads Demonstration Project | Open Energy Information  

Open Energy Info (EERE)

Roads Demonstration Project Roads Demonstration Project Jump to: navigation, search Name Hampton Roads Demonstration Project Facility Hampton Roads Demonstration Project Sector Wind energy Facility Type Offshore Wind Facility Status Proposed Developer Virginia State Government Location Chesapeake Bay VA Coordinates 36.965°, -76.289° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":36.965,"lon":-76.289,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

7

MANAGING THE NATIONAL ROAD NETWORK MAINTENANCE IN SPAIN Vctor Gmez Fras  

E-Print Network (OSTI)

, then to establish a maintenance policy. Finally, the Management System calculates a maintenance plan, detailingMANAGING THE NATIONAL ROAD NETWORK MAINTENANCE IN SPAIN Víctor Gómez Frías GETINSA (Spain), vgomez technical, economic and administrative management models. The Subdirectorate of Maintenance and Operation

Paris-Sud XI, Université de

8

Capital and Maintenance Projects for Efficiency Improvements  

Science Conference Proceedings (OSTI)

This Electric Power Research Institute (EPRI) project developed a methodology to assess the costs and benefits of potential maintenance improvements to coal-fired power plants, refined the methodology developed in 2008 to assess the net annual benefit of potential capital improvements to these plants, and applied the methodologies to a hypothetical plant. The calculations are captured in two spreadsheets8212one for capital projects and the other for maintenance projects8212that are included in the report...

2009-10-13T23:59:59.000Z

9

Advanced Electric Motor Predictive Maintenance Project  

Science Conference Proceedings (OSTI)

EPRI sponsored the three-year Advanced Electric Motor Predictive Maintenance (AEMPM) project in 2000 to increase the effectiveness of motor maintenance at a time when utilities were in a state of declining motor knowledge due to downsizing and restructuring. The project identified areas for improvement that were common to most utilities and selected appropriate measures to address these concerns. Areas addressed include documenting motor knowledge, increasing utility confidence in newer technologies and ...

2003-05-28T23:59:59.000Z

10

DOE Issues Environmental Assessment on Road Project for Public Review  

NLE Websites -- All DOE Office Websites (Extended Search)

Brad Bugger (208) 526-0833 DOE Issues Environmental Assessment on Road Project for Public Review Brad Bugger (208) 526-0833 DOE Issues Environmental Assessment on Road Project for Public Review The U.S. Department of Energy has issued for public review and comment a draft environmental assessment of the potential environmental impacts of building an internal road to safely ship radioactive material within the Idaho National Laboratory. DOE�s preferred alternative under the environmental assessment is to develop a new, internal road that would connect the Idaho Nuclear Technology and Engineering Center with the Materials and Fuels Complex, a distance of about 20 miles. It would allow the INL to safely ship nuclear materials from the Idaho Nuclear Technology and Engineering Center and the Materials and Fuels Complex without having to utilize public roads, like Highway 20, which adds additional cost and security considerations to each shipment.

11

A survey of models and algorithms for winter road maintenance. Part I: system design for spreading and plowing  

Science Conference Proceedings (OSTI)

Winter road maintenance operations involve a host of decision-making problems at the strategic, tactical, operational, and real-time levels. Those operations include spreading of chemicals and abrasives, snow plowing, loading snow into trucks, and hauling ... Keywords: Operations research, Snow disposal, Snow hauling, Snow removal, Winter road maintenance

Nathalie Perrier; André Langevin; James F. Campbell

2006-01-01T23:59:59.000Z

12

AWEA Wind Project Operations and Maintenance and Safety Seminar...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Operations and Maintenance and Safety Seminar AWEA Wind Project Operations and Maintenance and Safety Seminar January 15, 2014 8:00AM EST to January 16, 2014 5:00PM EST San...

13

Lessons Learned from Substation Predictive Maintenance Project TC Project #7014  

Science Conference Proceedings (OSTI)

A tailored collaboration conducted between 1993 and 1998 by EPRI and ten participating utilities aimed at optimizing substation performance through predictive maintenance. This report summarizes the lessons learned from the project; a more comprehensive report will be published after further research.

1998-12-19T23:59:59.000Z

14

Nuclear Maintenance Applications Center: Knowledge Transfer Improvement Project  

Science Conference Proceedings (OSTI)

The Nuclear Maintenance Application Center has begun a project a project to explore ways to improve how our products can be more easily used by our members and, in particular, the benefit that can be derived by the worker in the field. The project focuses on developing methods for improving the delivery of information that is specifically directed at maintenance tasks that are performed as part of preventive or corrective maintenance on plant equipment. The results are intended to benefit the maintenance...

2010-12-23T23:59:59.000Z

15

Kalispell Maintenance Headquarters Project : Environmental Assessment.  

Science Conference Proceedings (OSTI)

The facilities needed to maintain and repair Bonneville Power Administration (BPA's) electrical equipment in northwest Montana are currently in two locations: A maintenance headquarters at the Kalispell Substation, and a temporary leased facility south of Kalispell. The present situation is not efficient. There is not enough space to accommodate the equipment needed at each site, and coordination and communication between the two sites is difficult. Also, two sites means duplication of equipment and facilities. BPA needs a single, centralized facility that would efficiently accommodate all the area's maintenance activities and equipment. BPA proposes to build a maintenance headquarters facility consisting of 2 to 4 single-story buildings totaling about 35,000 square feet (office spaces and workshop areas); an open-ended vehicle storage building (carport style); a fenced-in storage year; a storage building for flammables, herbicides, and hazardous wastes; and a parking lot. The facility would require developing about 6 to 10 acres of land. Two sites are being considered for the proposed project (see the attached map for locations). This report is the environmental assessment of the two options.

United States. Bonneville Power Administration.

1991-01-01T23:59:59.000Z

16

Knowledge-Projection for Tele-Maintenance  

E-Print Network (OSTI)

-to-end system fault diagnosis and repair ­ Opening up opportunities to streamline the maintenance process Demo Data Mining GUI Query & Browse Facility System Trainer · Maintenance Procedures · Session Capture Navigator Query Engine Query Processing & Knowledge Retrieval Process Engine Dynamic Maintenance Management

Tu, Yicheng

17

CRAD, Maintenance - Idaho Accelerated Retrieval Project Phase II |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Idaho Accelerated Retrieval Project Phase II Idaho Accelerated Retrieval Project Phase II CRAD, Maintenance - Idaho Accelerated Retrieval Project Phase II Feburary 2006 A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Maintenance program at the Idaho National Laboratory, Idaho Accelerated Retrieval Project Phase II. CRADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, Maintenance - Idaho Accelerated Retrieval Project Phase II More Documents & Publications CRAD, Maintenance - Los Alamos National Laboratory TA 55 SST Facility

18

Dynamic risks modelling in ERP maintenance projects with FCM  

Science Conference Proceedings (OSTI)

Firms adopting Enterprise Resource Planning (ERP) have to maintain their applications until the end of the system life span. Proper ERP maintenance is a condition that is necessary to achieve the benefits expected of these packages. However, too many ... Keywords: ERP maintenance, Enterprise system, Expert knowledge, Fuzzy cognitive map, Projects risk

Cristina Lopez, Jose L. Salmeron

2014-01-01T23:59:59.000Z

19

Insights From EPRI Maintenance Rule Projects  

Science Conference Proceedings (OSTI)

The new NRC Maintenance Rule poses numerous challenges and opportunities for utilities due to its risk- and performance-based approach. This report provides many examples of problems and their solutions in the implementation of this regulation at several nuclear power plants. A comprehensive treatment of the technical basis for three troublesome areas of the rule--risk significance measures, performance criteria, and the balance between reliability and availability--is also provided to increase utility c...

1996-06-27T23:59:59.000Z

20

Solicitation - Geothermal Drilling Development and Well Maintenance Projects  

DOE Green Energy (OSTI)

Energy (DOE)-industry research and development (R and D) organization, sponsors near-term technology development projects for reducing geothermal drilling and well maintenance costs. Sandia National Laboratories (Albuquerque, NM) administers DOE funds for GDO cost-shared projects and provides technical support. The GDO serves a very important function in fostering geothermal development. It encourages commercialization of emerging, cost-reducing drilling technologies, while fostering a spirit of cooperation among various segments of the geothermal industry. For Sandia, the GDO also serves as a means of identifying the geothermal industry's drilling fuel/or well maintenance problems, and provides an important forum for technology transfer. Successfully completed GDO projects include: the development of a high-temperature borehole televiewer, high-temperature rotating head rubbers, a retrievable whipstock, and a high-temperature/high-pressure valve-changing tool. Ongoing GDO projects include technology for stemming lost circulation; foam cement integrity log interpretation, insulated drill pipe, percussive mud hammers for geothermal drilling, a high-temperature/ high-pressure valve changing tool assembly (adding a milling capability), deformed casing remediation, high- temperature steering tools, diagnostic instrumentation for casing in geothermal wells, and elastomeric casing protectors.

Sattler, A.R.

1999-07-07T23:59:59.000Z

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Archaeological investigations on the Buckboard Mesa Road Project  

SciTech Connect

In 1986, the Desert Research Institute (DRI) conducted an archaeological reconnaissance of a new alignment for the Buckboard Mesa Road on the Nevada Test Site for the Department of Energy (DOE). During this reconnaissance, several archaeological sites of National Register quality were discovered and recorded including a large quarry, site 26Ny4892, and a smaller lithic scatter, site 26Ny4894. Analysis of the debitage at 26Ny4892 indicates that this area was used primarily as a quarry for relatively small cobbles of obsidian found in the alluvium. Lithic reduction techniques used here are designed for efficiently reducing small pieces of toolstone and are oriented towards producing flake blanks from small cores and bifacially reducing exhausted cores. Projectile point cross references indicate that the area has seen at least casual use for about 10,000 years and more sustained use for the last 3,000 years. Initial obsidian hydration measurements indicate sustained use of the quarry for about the last 3,000 years although the loci of activities appear to change over time. Based on this study, the DRI recommends that quarrying activities in the area of 26Ny4892 are sufficiently sampled and that additional investigations into that aspect of prehistoric activity in the area are not necessary. This does not apply to other aspects of prehistoric use. DRI recommends that preconstruction surveys continue to identify nonquarrying, prehistoric utilization of the area. With the increased traffic on the Buckboard Mesa Road, there is a greater potential for vandalism to sites of National Register-quality located near the road. The DRI recommends that during the orientation briefing the workers at the Test Site be educated about the importance of cultural resources and the need for their protection. 202 refs., 41 figs., 52 tabs.

Amick, D.S.; Henton, G.H.; Pippin, L.C.

1991-10-01T23:59:59.000Z

22

EA-1941: Boyer-Tillamook Access Road Improvement Project, Tillamook and Yamhill Counties, Oregon  

Energy.gov (U.S. Department of Energy (DOE))

Bonneville Power Administration (BPA) is preparing an EA to assess the potential environmental impacts of proposed improvements to 13 miles of access roads for its existing 115-kV Boyer-Tillamook No. 1 Transmission Line in Tillamook and Yamhill counties, Oregon. Associated activities would include resurfacing roads, adding drainage, widening 3 miles of road, constructing 0.1 mile of new road, maintaining culverts, and constructing outlet ditches and retaining walls. In addition, new bridges would be built, and culverts that currently block fish passage for anadromous and resident fish would be replaced. Additional information is available at the project website: http://efw.bpa.gov/environmental_services/Document_Library/Boyer-Tillamook/.

23

Amargosa Farm Road Solar Energy Project Solar Power Plant | Open Energy  

Open Energy Info (EERE)

Amargosa Farm Road Solar Energy Project Solar Power Plant Amargosa Farm Road Solar Energy Project Solar Power Plant Jump to: navigation, search Name Amargosa Farm Road Solar Energy Project Solar Power Plant Facility Amargosa Farm Road Solar Energy Project Sector Solar Facility Type Concentrating Solar Power Developer Solar Millenium, LLC, MAN Ferrostaal Inc Location Nye County, Nevada Coordinates 38.5807111°, -116.0413889° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.5807111,"lon":-116.0413889,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

24

Do-It-Now building maintenance reengineering project  

Science Conference Proceedings (OSTI)

The Do-It-Now (DIN) building maintenance system is proposed to reduce the cost of routine building maintenance and repairs and to improve customer satisfaction with maintenance services. DIN uses a team approach to periodically inspect buildings and provide maintenance services on the spot. It emphasizes communications between the customers and the craftspeople performing the work. The system was designed using a reengineering approach that characterized the existing maintenance work control system, analyzed comparable systems in other DOE laboratories, envisioned an ideal system, and proposed a workable, testable system for initial implementation. At each stage, input was solicited from customer representatives and Facilities management to ensure meeting customer requirements with an implementable system.

Apoddaca, L.; Ayotte, A.; Coffman, J.; Dukes, L.; Jojola, S.; Kadlec, J.; Letourneau, S.; Matthews, R.; Paul, G.

1996-09-01T23:59:59.000Z

25

Microsoft Word - CX-Ross-Lexington_access_road_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Darin Bowman Darin Bowman Project Manager - TELF-TPP-3 Proposed Action: Access road repair including reconstructing, grading, and shaping of roads, placing and compacting of rock surfacing, installation of gates, installation and maintenance of erosion control and water drainage features, and restoration of disturbed areas. Budget Information: Work Order # 00259661 PP&A Project No.: 1738 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities...for...rights-of-way, infrastructures (e.g.. roads)...routine maintenance activities, corrective...are required to maintain and preserve infrastructures...in a condition suitable for the facility to be used for its designated purpose. Location: The project area is a Bonneville Power Administration (BPA) access road located on

26

Maintenance  

Science Conference Proceedings (OSTI)

Higher oil and labour costs, plus low quality fuel, demand that management takes a closer look at diesel engine lubrication. Problems of corrosion due to sulphur containing acids, oil analysis in order that it can be changed when necessary, filter analysis, use of multi-viscosity oil, and storage of oils are considered. A comprehensive lubricant conservation programme can reduce maintenance, labour costs and equipment downtime. Cleaning and replacement of bearings are discussed. Managing tire costs is also described.

Not Available

1981-06-01T23:59:59.000Z

27

Best Management Practices (BMPs) Manual for Access Road Crossings of Wetlands and Waterbodies  

Science Conference Proceedings (OSTI)

This manual addresses the selection and use of best management practices (BMPs) for the construction and/or maintenance of wetland and waterbody crossings by access roads associated with electric utility lines. Although the focus of this manual is on electric utility access roads, the contents are likely to be applicable to a much broader range of linear projects, including other types of roads and projects.

2002-03-22T23:59:59.000Z

28

Methodology for Assessing Greenhouse Gas Emissions and Assessing Mitigation Options for On-Road Mobile Sources Project for the Houston-Galveston Area Council  

E-Print Network (OSTI)

Methodology for Assessing Greenhouse Gas Emissions and Assessing Mitigation Options for On-Road Mobile Sources ­ Project for the Houston-Galveston Area Council This project addresses greenhouse gas

29

Microsoft Word - CX-Ostrander-Troutdale-access_road_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 30, 2010 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Rick Ross Project Manager - TELF-TPP-3 Proposed Action: Ostrander-Troutdale No. 1 transmission line access road maintenance including grading and rocking of road surfaces and installation of water bars and cross drain culverts Budget Information: Work Order #: Unavailable PP&A Project No.: PP&A #1740 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities for rights-of-way, infrastructures (e.g. roads) routine maintenance activities corrective are required to maintain and preserve infrastructures in a condition suitable for the facility to be used for its designed purpose. Location: The proposed project is located within the Bonneville Power Administration (BPA)

30

Stochastic Modeling of Future Highway Maintenance Costs for Flexible Type Highway Pavement Construction Projects  

E-Print Network (OSTI)

The transportation infrastructure systems in the United States were built between the 50's and 80's, with 20 years design life. As most of them already exceeded their original life expectancy, state transportation agencies (STAs) are now under increased needs to rebuild deteriorated transportation networks. For major highway maintenance projects, a federal rule enforces to perform a life-cycle cost analysis (LCCA). The lack of analytical methods for LCCA creates many challenges of STAs to comply with the rule. To address these critical issues, this study aims at developing a new methodology for quantifying the future maintenance cost to assist STAs in performing a LCCA. The major objectives of this research are twofold: 1) identify the critical factors that affect pavement performances; 2) develop a stochastic model that predicts future maintenance costs of flexible-type pavement in Texas. The study data were gathered through the Pavement Management Information System (PMIS) containing more than 190,000 highway sections in Texas. These data were then grouped by critical performance-driven factor which was identified by K-means cluster analysis. Many factors were evaluated to identify the most critical factors that affect pavement maintenance need. With these data, a series of regression analyses were carried out to develop predictive models. Lastly, a validation study with PRESS statistics was conducted to evaluate reliability of the model. The research results reveal that three factors, annual average temperature, annual precipitation, and pavement age, were the most critical factors under very low traffic volume conditions. This research effort was the first of its kind undertaken in this subject. The maintenance cost lookup tables and stochastic model will assist STAs in carrying out a LCCA, with the reliable estimation of maintenance costs. This research also provides the research community with the first view and systematic estimation method that STAs can use to determine long-term maintenance costs in estimating life-cycle costs. It will reduce the agency's expenses in the time and effort required for conducting a LCCA. Estimating long-term maintenance cost is a core component of the LCCA. Therefore, methods developed from this project have the great potential to improve the accuracy of LCCA.

Kim, Yoo Hyun

2012-05-01T23:59:59.000Z

31

Expert Meeting Report: Key Innovations for Adding Energy Efficiency to Maintenance Projects  

SciTech Connect

This report describes an expert meeting hosted by the Building America research team NAHB Research Center, which was held on February 8, 2012, in Orlando, Florida. The topic, Key Innovations for Adding Energy Efficiency to Maintenance Projects, was intended to provide direction to more focused efforts to increase the efficiency of existing homes; in this meeting, the focus was specifically for re-roofing and the opportunities for adding energy efficiency upgrades during this major home repair activity.

Wood, A.; Wiehagen, J.

2012-09-01T23:59:59.000Z

32

Nez Perce Tribal Hatchery Project : Combined-Planning & Design and Operations & Maintenance Reports, 2000 Annual Report.  

DOE Green Energy (OSTI)

Nez Perce Tribal Hatchery (NPTH) Year-2000 Combined Maintenance and Operations (O&M) and Planning and Design (P&D) contract is hereby completed based on this annual report patterned after the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration. Primary project activities focused on completion of the Northwest Power Planning Council Step-3 process that: (1) Accepted final design, (2) Authorized a capital construction amount of $16,050,000, and (3) Authorized contractor selection, and (4) Provided construction site dedication, and (5) Implemented construction activities over an anticipated 2-year period of July 2000 through October 2002.

Larson, Roy Edward; Walker, Grant W.

2002-12-31T23:59:59.000Z

33

Nez Perce Tribal Hatchery Project; Operations and Maintenance and Planning and Design, 2002 Annual Report.  

DOE Green Energy (OSTI)

This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2002 annual report combines information from two contracts with a combined value of $3,036,014. Bonneville Power Administration identifies them as follows; (1) Part I--Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and $2,682,635 which includes--Equipment costs of $1,807,105. (2) Part II--Planning and Design--Project No. 1983-35-04, Contract No. 4035, $352,379 for Clearwater Coho Restoration Master Plan development Based on NPPC authorization for construction and operation of NPTH, the annual contracts were negotiated for the amounts shown above under (1) and (2). Construction contracts were handled by BPA until all facilities are completed and accepted.

Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

2005-12-01T23:59:59.000Z

34

Kalispell Maintenance Headquarters Project : Environmental Assessment and Findings of No Significant Impact.  

SciTech Connect

The facilities needed to maintain and repair Bonneville Power Administration (BPA`s) electrical equipment in northwest Montana are currently in two locations: A maintenance headquarters at the Kalispell Substation, and a temporary leased facility south of Kalispell. The present situation is not efficient. There is not enough space to accommodate the equipment needed at each site, and coordination and communication between the two sites is difficult. Also, two sites means duplication of equipment and facilities. BPA needs a single, centralized facility that would efficiently accommodate all the area`s maintenance activities and equipment. BPA proposes to build a maintenance headquarters facility consisting of 2 to 4 single-story buildings totaling about 35,000 square feet (office spaces and workshop areas); an open-ended vehicle storage building (carport style); a fenced-in storage year; a storage building for flammables, herbicides, and hazardous wastes; and a parking lot. The facility would require developing about 6 to 10 acres of land. Two sites are being considered for the proposed project (see the attached map for locations). This report is the environmental assessment of the two options.

United States. Bonneville Power Administration.

1991-12-01T23:59:59.000Z

35

Microsoft Word - CX-Boyer-Tillamook_access_road_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

James Semrau Project Manager - TELF-TPP-3 David Forward TELF-TPP-3 Proposed Action: Boyer-Tillamook No. 1 transmission line access road maintenance including grading and rocking of road surfaces and installation of water bars and cross drain culverts Budget Information: Work Order #00253279 PP&A Project No.: PP&A 1533 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities...for...rights-of-way...(e.g. roads)...required to maintain and preserve...infrastructures in a condition suitable for a facility to be used for its designated purpose. Location: Tillamook and Yamhill counties, Oregon. Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action:

36

Microsoft Word - CX-Cardwell-Cowlitz2011AccessRoad_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KEP-4 KEP-4 SUBJECT: Environmental Clearance Memorandum Rick Ross Project Manager - TELF-TPP-3 Proposed Action: Access road maintenance on or leading to the Cardwell-Cowlitz No.1, 115-kilovolt (kV) transmission line. Budget Information: Work Order #00281014 PP&A Project No.: 2020 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities... for...rights-of-way, infrastructures (e.g.. roads)... routine maintenance activities, corrective...are required to maintain and preserve infrastructures...in a condition suitable for the facility to be used for its designated purpose. Location: The project area consists of Bonneville Power Administration (BPA) access roads located on or leading to the Cardwell-Cowlitz No. 1, 115-kV transmission line right-of-way.

37

Microsoft Word - CX-McNary-SantiamAccessRoad_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

James Semrau Project Manager - TELF-TPP-3 Proposed Action: Access road maintenance along the McNary-Santiam 230-kV and Jones Canyon-Santiam 230-kV transmission line corridors. Budget Information: WO #00292092 PP&A Project No.: 2044 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities... for...rights-of-way, infrastructures (e.g.. roads)... routine maintenance activities, corrective...are required to maintain and preserve infrastructures...in a condition suitable for the facility to be used for its designated purpose. Location: The project area consists of Bonneville Power Administration (BPA) access roads located on the McNary-Santiam (structure 123/1) & Jones Canyon-Santiam (structure 75/1)

38

Microsoft Word - CX-Kalispell-KerrMile15-16AccessRoadImprovementFY12_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 REPLY TO ATTN OF: KEPR-Bell-1 SUBJECT: Environmental Clearance Memorandum Joe Johnson Project Manager - TELF-TPP-3 Proposed Action: Access road improvement for the Kalispell-Kerr #1, 115-kilovolt (kV) transmission line PP&A Project No.: 2474 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine Maintenance, B1.13 Pathways, short access roads, and rail lines Location: Township 26 North, Range 21 West, Section 13 and 24, Flathead County, MT. Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to perform access road maintenance on several segments of the access road for the Kalispell-Kerr #1, 115-kV transmission line. Work includes reconstruction and drainage enhancements on 5000 feet of road beginning at structure

39

Expert Meeting Report: Key Innovations for Adding Energy Efficiency to Maintenance Projects  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Key Innovations for Key Innovations for Adding Energy Efficiency to Maintenance Projects A. Wood and J. Wiehagen NAHB Research Center September 2012 NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, subcontractors, or affiliated partners makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply

40

Maintenance and Insurance Options for Managing Technical Risks in Combustion Turbine Projects  

Science Conference Proceedings (OSTI)

Costs for combustion turbine maintenance typically represent over half of the total non-fuel operation and maintenance (O&M) costs for combined-cycle power plants. Technical risks in component durability and integrity expose owners/operators to higher costs for maintaining units in operating condition. Potentially catastrophic events have occurred that have required significant maintenance expenditures to cover costs of component repair and replacement. This report looks at aspects of insurance and long-...

2010-12-02T23:59:59.000Z

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

CNG in OKC: Improving Efficiency at the Pump and on the Road | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CNG in OKC: Improving Efficiency at the Pump and on the Road CNG in OKC: Improving Efficiency at the Pump and on the Road CNG in OKC: Improving Efficiency at the Pump and on the Road March 8, 2012 - 4:02pm Addthis Andy Mitchell, Public Works Project Manager for the City of Oklahoma City, refills a vehicle at the new fast-fill CNG fueling station located at the city's main maintenance facility. | Courtesy of the City of Oklahoma City. Andy Mitchell, Public Works Project Manager for the City of Oklahoma City, refills a vehicle at the new fast-fill CNG fueling station located at the city's main maintenance facility. | Courtesy of the City of Oklahoma City. Jennifer Holman Project Officer, Golden Field Office What does this mean for me? Switching from gasoline and diesel fuels to compressed natural gas (CNG) can mean significantly lower amounts of carbon dioxide and air

42

Nez Perce Tribal Hatchery Project, Operations and Maintenance and Planning and Design, 2001 Annual Report.  

DOE Green Energy (OSTI)

This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2001 annual report combines information from two contracts with a combined value of $2,336,491. They are identified by Bonneville Power Administration as follows: (1) Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and (2) Planning and Design--Project No. 1983-350-00, Contract No. 4035. The Operations and Maintenance (O&M) budget of $2,166,110 was divided as follows: Facility Development and Fish Production Costs--$860,463; and Equipment Purchases as capital cost--$1,305,647 for equipment and subcontracts. The Planning and Design (P&D) budget of $170,381 was allocated to development of a Coho master planning document in conjunction with Nez Perce Tribal Hatchery. The O&M budget expenditures represent personnel and fish production expenses; e.g., administration, management, coordination, facility development, personnel training and fish production costs for spring Chinook and Coho salmon. Under Objective 1: Fish Culture Training and Education, tribal staff worked at Clearwater Anadromous Hatchery (CAFH) an Idaho Department of Fish and Game (IDFG) facility to produce spring Chinook smolt and parr for release that are intended to provide future broodstock for NPTH. As a training exercise, BPA allowed tribal staff to rear Coho salmon at Dworshak National Fish Hatchery, a U.S. Fish and Wildlife Service (USFWS) facility. This statement of work allows this type of training to prepare tribal staff to later rear salmon at Nez Perce Tribal Hatchery under Task 1.6. As a subset of the O&M budget, the equipment purchase budget of $1,305,647 less $82,080 for subcontracts provides operational and portable equipment necessary for NPTH facilities after construction. The equipment budget for the year was $1,223,567; this year's purchases amounted $287,364.48 (see Table 5). Purchases are itemized in Appendix D and E. FishPro, Inc. assisted tribal staff with equipment purchases. The unspent contract balances will be carried forward to the ensuing year to complete equipment purchases essential to hatchery operations. The NPTH activities focused on completion of the Northwest Power Planning Council Step-3 decision that authorized hatchery construction. Construction began in July 2000. It is anticipated to continue through October 2002. At the end of 2001, the hatchery facilities were approximately 70% completed and the budget approximately 90% expended. The following facilities are either completed or in final stages of construction: (1) NPTH Central Hatchery facility at Site 1705, and (2) North Lapwai Valley satellite, and (3) Sweetwater Springs satellite, and (4) Yoosa-Camp satellite, and (5) Newsome Creek satellite, and (6) Lukes Gulch satellite, and (7) Cedar Flats satellite.

Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

2006-03-01T23:59:59.000Z

43

Microsoft Word - CX-Ross-Lexington_access_road_addition_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KEPR-4 KEPR-4 SUBJECT: Environmental Clearance Memorandum Dawneen Dostert Project Manager - TERR-LMT Proposed Action: New access road construction to include clearing, grading, and shaping of roads, placing and compacting of rock surfacing, installation of gates, installation and maintenance of erosion control and water drainage features, and restoration of disturbed areas Budget Information: Work Order # 00230995 PP&A Project No.: 1534 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.13 Construction/ acquisition/relocation of onsite pathways, short onsite access roads/railroads. Location: The project area is confined to the existing and proposed access roads around the right-of-way (ROW) corridor of Bonneville Power Administration's (BPA) Ross-Lexington

44

Rapid road repair vehicle  

DOE Patents (OSTI)

Disclosed is a rapid road repair vehicle capable of moving over a surface to be repaired at near normal posted traffic speeds to scan for and find at the high rate of speed, imperfections in the pavement surface, prepare the surface imperfection for repair by air pressure and vacuum cleaning, applying a correct amount of the correct patching material to effect the repair, smooth the resulting repaired surface, and catalog the location and quality of the repairs for maintenance records of the road surface. The rapid road repair vehicle can repair surface imperfections at lower cost, improved quality, at a higher rate of speed than was not heretofor possible, with significantly reduced exposure to safety and health hazards associated with this kind of road repair activities in the past. 2 figs.

Mara, L.M.

1998-05-05T23:59:59.000Z

45

Microsoft Word - CX-Satsop-Aberdeen roads FY10_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30, 2010 30, 2010 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Jim Semrau Project Manager - TELF-TPP-3 Proposed Action: Maintenance of access roads serving the Satsop-Aberdeen No. 2 and No. 3, and the Aberdeen Tap to South Elma-Cosmopolis transmission lines PP&A Project No.: 1697 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads, equipment... routine maintenance activities, corrective...are required to maintain...infrastructures...in a condition suitable for a facility to be used for its designated purpose. Location: The Project is located in Gray's Harbor County, Washington, between the towns of

46

PV Reliability Operations and Maintenance (PVROM) Database Initiative: 2013 Project Report  

Science Conference Proceedings (OSTI)

To fill a major knowledge gap, EPRI and Sandia National Laboratories are jointly engaged in a multi-year research effort to examine photovoltaic (PV) plant reliability performance obtained through documented field data. Findings and analyses, derived from the PV Reliability Operations Maintenance (PVROM) database, are intended to inform industry best practices around the optimal operations and maintenance (O&M) of solar assets.Currently being populated with initial PV plant ...

2013-12-23T23:59:59.000Z

47

Maintenance and Veg Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Functions Infrastructure projects Interconnection OASIS OATT Reauthorization of Transmission Line Permits, Maintenance and Vegetation Management on Forest Service Lands...

48

Microsoft Word - CX-GarrisonSubstationAccessRoadImprovementFY13_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2013 8, 2013 REPLY TO ATTN OF: KEPR-Bell-1 SUBJECT: Environmental Clearance Memorandum Jonathan Malmberg Project Manager - TETQ-TPP-3 Proposed Action: Maintenance along sections of the access road leading to Bonneville Power Administration's (BPA) Garrison Substation PP&A Project No.: 2609 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine Maintenance. B1.13 Pathways, short access roads, and rail lines. Location: As identified in table below: Township Range Section County 9N 11W 14, 13, 24 Powell 9N 10W 19, 30, 20 Powell Proposed by: BPA Description of the Proposed Action: BPA proposes repairing a corrugated metal pipe end; making minor asphalt repairs; and grading, shaping, compacting, and placing road aggregate on 20,005 linear feet

49

SOLERAS - Solar-Powered Water Desalination Project at Yanbu: Forecasting models for operating and maintenance cost of the pilot plant  

Science Conference Proceedings (OSTI)

This study was conducted in cooperation with the Department of Industrial Engineering of King Abdulaziz University. The main objective of this study is to meet some of the goals of the Solar Energy Water Desalination Plant (SEWDP) plan in the area of economic evaluation. The first part of this project focused on describing the existing trend in the operation and maintenance (OandM) cost for the SOLERAS Solar Energy Water Desalination Plant in Yanbu. The second part used the information obtained on existing trends to find suitable forecasting models. These models, which are found here, are sensitive to changes in costs trends. Nevertheless, the study presented here has established the foundation for (OandM) costs estimating in the plant. The methodologies used in this study should continue as more data on operation and maintenance costs become available, because, in the long run, the trend in costs will help determine where cost effectiveness might be improved. 7 refs., 24 figs., 15 tabs.

Al-Idrisi, M.; Hamad, G.

1987-04-01T23:59:59.000Z

50

Microsoft Word - maintenance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

System Maintenance Checklist System Maintenance Checklist The following checklist is intended to provide system owners, project managers and other information system developers and maintainers with guidance in identifying and planning system maintenance activities. The objectives of system maintenance are summarized as: C Resolution of errors, faults, and failures. C The requirements for system maintenance initiates lifecycle changes. The change is remapped and executed, thereby treating the maintenance process as iterations of development. Rev: 09/02 1 Maintenance Checklist SEM Reference Comments " A procedure exists for handling emergency changes that cannot be implemented as part of a scheduled release. Chapter 10 Maintenance " An identification number is assigned to the modification.

51

Applications Center: Preventive Maintenance Basis for FLEX Equipment—Project Overview Report  

Science Conference Proceedings (OSTI)

This report describes the status of the EPRI Preventive Maintenance Basis Database (PMBD) and recent modifications that will assist nuclear power plant management in responding to new U.S. federal regulatory requirements known as the Flexible Response (FLEX) program. The FLEX program stems from lessons learned about emergency response to disaster scenarios from the Fukushima Dai-ichi earthquake and related tsunami events in Japan. It requires additional equipment to be stored for long periods to ...

2013-09-30T23:59:59.000Z

52

Data Collection for Current U.S. Wind Energy Projects: Component Costs, Financing, Operations, and Maintenance; January 2011 - September 2011  

DOE Green Energy (OSTI)

DNV Renewables (USA) Inc. (DNV) used an Operations and Maintenance (O&M) Cost Model to evaluate ten distinct cost scenarios encountered under variations in wind turbine component failure rates. The analysis considers: (1) a Reference Scenario using the default part failure rates within the O&M Cost Model, (2) High Failure Rate Scenarios that increase the failure rates of three major components (blades, gearboxes, and generators) individually, (3) 100% Replacement Scenarios that model full replacement of these components over a 20 year operating life, and (4) Serial Failure Scenarios that model full replacement of blades, gearboxes, and generators in years 4 to 6 of the wind project. DNV selected these scenarios to represent a broad range of possible operational experiences. Also in this report, DNV summarizes the predominant financing arrangements used to develop wind energy projects over the past several years and provides summary data on various financial metrics describing those arrangements.

Martin-Tretton, M.; Reha, M.; Drunsic, M.; Keim, M.

2012-01-01T23:59:59.000Z

53

Categorical Exclusion for Access Road  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Access Road Access Road Improvements along the Pinnacle Peak- Prescott 230-kV Transmission Line between Structures 16813 and 170/1 Yavapai County. Arizona * RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to improve access roads along a portion of the Pinnacle Peak to Prescott 230-kV Transmission Line (Structures 168/3 and 170/1). which are currently impassable. to maintain worker safety and the reliability of the bulk electric system. Western plans to blade and grade the existing access road where it enters and leaves three washes so that Western's maintenance vehicles can drive across the washes. We will remove dirt from the road prism by starting at wash edges and pulling dirt up slope in order to create ramps with grades suitable for our equipment.

54

Microsoft Word - CX-LowerGranite-HatwaiAccessRoadImprovementFY13_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2012 9, 2012 REPLY TO ATTN OF: KEPR-Bell-1 SUBJECT: Environmental Clearance Memorandum Kristi Unholz Project Manager - TELF-TPP-3 Proposed Action: Improve the access road system in miles 4, 5, 16, 17, 18, and 30 of the Lower Granite-Hatwai transmission line PP&A Project No.: 2378 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine Maintenance. B1.13 Pathways, short access roads, and rail lines Location: As identified in table below: Lower Granite-Hatwai Access Road Project Location Township Range Section County, State mile 4 to mile 5 13N 43E 2 Whitman, WA mile 16 12N 45E 8 mile 17 12N 45E 17 mile 18 12N 45E 20 mile 30 36N 5W 19, 30 Nez Perce, ID Proposed by: Bonneville Power Administration (BPA)

55

Project 328  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 CONTACTS Gary J. Stiegel Gasification Technology Manager National Energy Technology Laboratory 626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236 412-386-4499 gary.stiegel@netl.doe.gov Jenny Tennant Project Manager National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507 304-285-4830 Jenny.Tennant@netl.doe.gov Gasification Technologies Conceptual drawing of Rocketdyne's gasification system ADVANCED GASIFICATION SYSTEMS DEVELOPMENT Description Rocketdyne will apply rocket engine technology to gasifier design, allowing for a paradigm shift in gasifier function, resulting in significant improvements in capital and maintenance costs. Its new gasifier will be an oxygen-blown, dry-feed, plug-flow entrained reactor able to achieve carbon conversions of nearly 100 percent by rapidly heating low coal particles

56

Microsoft Word - CX-IndianCabinRoadRepair_PPA1908_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

United States Government Department of Energy United States Government Department of Energy Bonneville Power Administration DATE: June 22, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Elizabeth Johnson Natural Resource Specialist - TFBV-THE DALLES Proposed Action: Indian Cabin Road Repair PP&A Project No.: 1908 Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance activities...for structures, rights of way, infrastructures such as roads, equipment... routine maintenance activities, corrective....are required to maintain...infrastructures...in a condition suitable for a facility to be used for its designated purpose. Location: The project is located in Skamania County, Washington, T3N, R8E, Sections 27

57

Microsoft Word - CX-Marion-AlveyMarion-LaneAccessRoad_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REPLY TO ATTN OF: KEP-Alvey SUBJECT: Environmental Clearance Memorandum Darin Bowman Manuel Campos Civil Engineer - TELF-TPP-3 Civil Engineer - TELF-TPP-3 Proposed Action: Access road improvements along portions of the Marion-Alvey #1 and Marion-Lane #1 transmission line rights-of-way. PP&A Project No: 1961 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities...for structures, rights of way, infrastructures such as roads, equipment... routine maintenance activities, corrective....are required to maintain...infrastructures...in a condition suitable for a facility to be used for its designed purpose. Location: The project area is located in Marion and Linn counties, Oregon, in Bonneville

58

GENII (Generation II): The Hanford Environmental Radiation Dosimetry Software System: Volume 3, Code maintenance manual: Hanford Environmental Dosimetry Upgrade Project  

Science Conference Proceedings (OSTI)

The Hanford Environmental Dosimetry Upgrade Project was undertaken to incorporate the internal dosimetry models recommended by the International Commission on Radiological Protection (ICRP) in updated versions of the environmental pathway analysis models used at Hanford. The resulting second generation of Hanford environmental dosimetry computer codes is compiled in the Hanford Environmental Dosimetry System (Generation II, or GENII). This coupled system of computer codes is intended for analysis of environmental contamination resulting from acute or chronic releases to, or initial contamination of, air, water, or soil, on through the calculation of radiation doses to individuals or populations. GENII is described in three volumes of documentation. This volume is a Code Maintenance Manual for the serious user, including code logic diagrams, global dictionary, worksheets to assist with hand calculations, and listings of the code and its associated data libraries. The first volume describes the theoretical considerations of the system. The second volume is a Users' Manual, providing code structure, users' instructions, required system configurations, and QA-related topics. 7 figs., 5 tabs.

Napier, B.A.; Peloquin, R.A.; Strenge, D.L.; Ramsdell, J.V.

1988-09-01T23:59:59.000Z

59

Nuclear Maintenance Applications Center: Feed Pump Turbine Maintenance Guide  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) Steam Turbines and Auxiliaries Program 65 and the Nuclear Maintenance Application Center have developed a series of maintenance guides to assist plant personnel with the performance of various maintenance tasks associated with a wide variety of plant components. The objective of this project was to publish a maintenance guide for the feed pump turbines that included an ...

2012-09-25T23:59:59.000Z

60

Stalled on the Road to the Market: Analysis of Field Experience with a Project to Promote Lighting Efficiency in India  

E-Print Network (OSTI)

1991. "Energy-Efficient Lighting in Brazil and India:on Energy-Efficient Lighting. Stockholm, Sweden. Katzev,with a Project to Promote Lighting Efficiency in India AJ.

Gadgil, A.J.

2008-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Maintenance Work Management -- Best Practices Guidelines: Maintenance Assessment and Improvement  

Science Conference Proceedings (OSTI)

This report on maintenance work management best practices is part of EPRI's Plant Maintenance Optimization (PMO) development efforts. Based on a series of assessment and improvement projects, the report describes the process and typical results.

1998-03-12T23:59:59.000Z

62

Offshore software maintenance methodology  

Science Conference Proceedings (OSTI)

Keywords: maintenance methodology, offshore maintenance, remote maintenance, software economics, software maintenance

M. Pavan Kumar; V. Sita Rama Das; N. Netaji

1996-05-01T23:59:59.000Z

63

Tanzania Roads Evaluation - Baseline | Data.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Tanzania Roads Evaluation - Baseline Tanzania Roads Evaluation - Baseline Agriculture Community Menu DATA APPS EVENTS DEVELOPER STATISTICS COLLABORATE ABOUT Agriculture You are here Data.gov » Communities » Agriculture » Data Tanzania Roads Evaluation - Baseline Dataset Summary Description Baseline survey for impact evaluation of MCC's roads improvement investments in Tanzania. The evaluation will examine the project's household- and community-level effects on local standards of living along the roads. For the evaluation of major roads on the mainland, Economic Development Initiatives conducted a survey of 3,000 households in 200 communities in 2009. For the Pemba rural roads evaluation, Economic Development Initiatives conducted a survey on 570 households in the treatment group and 630 households in the comparison group.

64

The Wind Project Development Process  

Wind Powering America (EERE)

Wind Project Wind Project Development Process Developed for the National Renewable Energy Laboratory by Dale Osborn Distributed Generation Systems, Inc. September 1998 The Wind Project Development Process Site Selection Land Agreements Wind Assessment Environmental Review Economic Modeling Interconnection Studies Financing Permitting Sales Agreements Turbine Procurement Construction Contracting Operations & Maintenance Site Selection Evidence of Significant Wind Preferably Privately Owned Remote Land Proximity to Transmission Lines Reasonable Road Access Few Environmental Concerns Receptive Community Land Agreements Term: Expected Life of the Turbine Assignable Indemnification Rights Compensation: Percentage of Revenues Reclamation Provision Wind Rights, Ingress/Egress Rights, Transmission Rights

65

TOWARDS A MAINTENANCE SEMANTIC ARCHITECTURE Mohamed Hedi Karraya  

E-Print Network (OSTI)

packages (Computerized Maintenance Management System). The daily events of maintenance were treated a complex information system for maintenance management [9]. The project aimed to develop a collaborative including the existing systems of data acquisition, control, maintenance management, diagnosis assistance

Paris-Sud XI, Université de

66

The ethanol heavy-duty truck fleet demonstration project  

DOE Green Energy (OSTI)

This project was designed to test and demonstrate the use of a high- percentage ethanol-blended fuel in a fleet of heavy-duty, over-the- road trucks, paying particular attention to emissions, performance, and repair and maintenance costs. This project also represents the first public demonstration of the use of ethanol fuels as a viable alternative to conventional diesel fuel in heavy-duty engines.

NONE

1997-06-01T23:59:59.000Z

67

A quality assurance program for software maintenance  

Science Conference Proceedings (OSTI)

This paper presents the description of a quality assurance (QA) program applied to software maintenance projects. The QA program is a set of checks or inspections overlaid on the steps of the maintenance project. The relationship between the QA program ...

John W. Center

1982-06-01T23:59:59.000Z

68

Microsoft Word - CX-GrandCouleeDistrictWoodPoleReplacementsAccessRoadsFY13_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KEPR-Bell-1 SUBJECT: Environmental Clearance Memorandum Todd Wehner Civil Design/Access Roads - TELF-TPP-3 James Semrau Project Manager - TEP-TPP-1 Proposed Action: Wood pole replacement, equipment landing construction, and access road improvements along various transmission lines in Bonneville Power Administration's (BPA) Grand Coulee District. PP&A Project No.: 2152 (Grand Coulee-Chief Joseph No. 1), 2151 (Grand Coulee-Chief Joseph No. 2), 2121 (Grand Coulee-Foster Creek No. 1) and 1776 (Grand Coulee-Okanogan No. 2) Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance Location: Douglas and Okanogan counties, Washington. Refer to table below for project locations: Line Name Structure Township Range Section County

69

(DOE/EIS-0128-SA-02): Supplement Analysis: Los Banos-Gates (Path 15) Transmission line project changes to alignment, access road stream crossing, and basis for Supplemental EIS Determination  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Los Banos-Gates (Path 15) Transmission Line Project DOE/EIS-0128-SA02 Western Area Power Administration Sierra Nevada Customer Service Region U.S. Department of Energy Changes to Alignment, Access Road Stream Crossing, and Basis for Supplemental Environmental Impact Statement Determination Background The Los Banos-Gates 500-kilovolt Transmission Line project was originally proposed as part of the California-Oregon Transmission Project in the 1980s. These two projects were the subject of a single set of documents prepared in 1986 (draft) and 1988 (final) that served as the Environmental Impact Statement (EIS) under the National Environmental Policy Act and the Environmental Impact Report (EIR) under the California Environmental Quality Act. The EIS is entitled "Final Environmental Impact

70

A GIS based approach to predicting road surface temperatures  

Science Conference Proceedings (OSTI)

Treatment of transport networks of the winter period is a key responsibility of maintenance teams whether in the private or public sector. With tightening budgets and increasing statutory requirements, maintenance teams are looking to improve the treatment ... Keywords: ASP.NET, ArcGIS server, GIS, ice prediction, roads

Richard Fry; Lionel Slade; George Taylor; Ian Davy

2007-11-01T23:59:59.000Z

71

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Hygiene Substation Access Road Repairs  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hygiene Substation Access Road Repairs Hygiene Substation Access Road Repairs A. Brief Description of Proposal: Western Area Power Administration proposes to repair the access road/driveway into the Hygiene Substation. There is a low spot in the middle of the driveway that impedes maneuvering oflarge maintenance equipment in and out of the yard. Western plans to fill the low spot with road base and crumbled concrete fill. The Hygiene Substation is located in Boulder County, approximately 2 miles northwest of Longmont, CO (T3N, R69W, Sec 18). All proposed construction will occur within the existing, disturbed substation access road/driveway. B. Number and Title of tile Categorical Exclusion Being Applied: (See text in 10 CFR 1021, Subpart D.) BI.3 Routine maintenance activities and custodial services for buildings, structures,

72

Operations & Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Rates Operations & Maintenance Operations OASIS: WACM (Note: this site is not hosted by Western and requires a digital certificate and login for full access.) wesTTrans Common...

73

Nuclear Maintenance Application Center: Characterizing International Maintenance Practices  

Science Conference Proceedings (OSTI)

In 1987, the Electric Power Research Institute (EPRI) published report NP-5185-SR, Maintenance of European Nuclear Power Plants. The project comprised visits to six plant sites in six European countries over a two-week period and reported on the state of the various maintenance processes and programs in use at each location.

2012-08-07T23:59:59.000Z

74

Photovoltaic Operation and Maintenance Evaluation  

Science Conference Proceedings (OSTI)

Results from this study confirm that photovoltaic power plants require low operating and maintenance costs per kilowatthour. Projections based on these results suggest that in the future costs will fall below 0.5 cent per kilowatthour.

1990-01-11T23:59:59.000Z

75

Grande Ronde Endemic Spring Chinook Salmon Supplementation Project; Lostine River Operations and Maintenance 2007 Smolt Acclimation and Adult Return Report.  

DOE Green Energy (OSTI)

The Nez Perce Tribe (NPT), through funding provided by the Bonneville Power Administration (BPA), has implemented a Chinook salmon supplementation program (250,000 smolts) on the Lostine River, a tributary to the Grande Ronde River of Oregon. The Grande Ronde Endemic Spring Chinook Salmon Supplementation project, which involves supplementation of the Upper Grande Ronde River and Catherine Creek in addition to the Lostine River, was established to prevent extirpation and increase the number of threatened Snake River spring/summer Chinook salmon (Oncorhynchus tshawytscha) returning to the Grande Ronde River. This report covers the eleventh season (1997-2007) of adult Chinook salmon broodstock collection in the Lostine River and the ninth season (1999-2007) of acclimation of resulting Lostine River progeny. Production of Lostine River spring Chinook salmon smolts currently occurs at Lookingglass Fish Hatchery (LGH). The Lostine River supplementation program utilizes two strategies to obtain egg source for production of smolts for supplementation: captive broodstock and conventional broodstock. The captive broodstock strategy involves (1) capture of natural juvenile spring Chinook salmon smolts from the Lostine River, (2) rearing those to adult and spawning them, and (3) rearing the resultant progeny for eventual acclimation and release back into the Lostine River. The conventional broodstock strategy involves (1) capture of natural and hatchery origin adults returning to the Lostine River, (2) holding those adults and spawning them, and (3) rearing the resultant progeny for acclimation and release back into the Lostine River. This report focuses on (1) the trapping and collection of adult spring Chinook salmon that return to the Lostine River, which provides the broodstock source for the conventional strategy and (2) the acclimation and release of juvenile spring Chinook salmon produced from the captive broodstock and conventional broodstock strategies In 2007, acclimation of Lostine River spring Chinook salmon smolts occurred from 3/5/07 through to 4/17/07 and a total of 230,010 smolts were acclimated and released. These smolts were produced from the brood year (BY) 2005 egg source and included captive brood (24,604) and conventional (205,406) origin smolts that were all progeny of Lostine River spring Chinook salmon. Operation of the Lostine River adult monitoring and collection facility in 2007 began May 14th. The first Chinook was captured on June 2, 2007 and the last Chinook was captured on September 25, 2007. The weir and trap were removed on October 1, 2007. A total of 637 adult Chinook, including jacks, were captured during the season. The composition of the run included 240 natural origin fish and 397 hatchery supplementation fish. There were no identified 'stray' hatchery fish from other programs trapped. Of the fish captured, 41 natural and 81 hatchery supplementation adults were retained for broodstock and transported to LGH for holding and spawning, 403 adult Chinook were passed or transported above the weir to spawn naturally, and only hatchery origin jack Chinook were transported and outplanted in the Wallowa River and Bear Creek in underseeded habitat. Of the 122 adult fish retained for broodstock, 20 natural females and 40 supplementation females were represented in spawning. The eggs from these females produced a total of 267,350 eggs at fertilization. Eye-up was 86.73% which yielded a total of 231,882 conventional program eyed eggs. The fecundity averaged 4,456 eggs per female. These eggs will be incubated and reared at Lookingglass Hatchery until they are smolts in the spring of 2009. Captive brood program eggs/fish will be added to the conventional program eggs to make up the entire juvenile release for the Lostine River program in 2009. Due to the success of the 2007 egg collection, the number of fish produced exceeded program needs and facility capabilities. As a result, there are plans to outplant fry in 2008 and parr in early 2009 to underseeded habitat in the Wallowa River.

Zollman, Richard L.; Eschler, Russell; Sealey, Shawn [Nez Perce Tribe

2009-03-31T23:59:59.000Z

76

Grande Ronde Endemic Spring Chinook Salmon Supplementation Project; Lostine River Operations and Maintenance 2006 Smolt Acclimation and Adult Return Report.  

DOE Green Energy (OSTI)

The Nez Perce Tribe (NPT), through funding provided by the Bonneville Power Administration (BPA), has implemented a Chinook salmon supplementation program (250,000 smolts) on the Lostine River, a tributary to the Grande Ronde River of Oregon. The Grande Ronde Endemic Spring Chinook Salmon Supplementation project, which involves supplementation of the Upper Grande Ronde River and Catherine Creek in addition to the Lostine River, was established to prevent extirpation and increase the number of threatened Snake River spring/summer Chinook salmon (Oncorhynchus tshawytscha) returning to the Grande Ronde River. This report covers the tenth season (1997-2006) of adult Chinook salmon broodstock collection in the Lostine River and the eighth season (1999-2006) of acclimation of resulting Lostine River progeny. Production of Lostine River spring Chinook salmon smolts currently occurs at Lookingglass Fish Hatchery (LGH). The Lostine River supplementation program utilizes two strategies to obtain egg source for production of smolts for supplementation: captive broodstock and conventional broodstock. The captive broodstock strategy involves (1) capture of natural juvenile spring Chinook salmon smolts from the Lostine River, (2) rearing those to adult and spawning them, and (3) rearing the resultant progeny for eventual acclimation and release back into the Lostine River. The conventional broodstock strategy involves (1) capture of natural and hatchery origin adults returning to the Lostine River, (2) holding those adults and spawning them, and (3) rearing the resultant progeny for acclimation and release back into the Lostine River. This report focuses on (1) the trapping and collection of adult spring Chinook salmon that return to the Lostine River, which provides the broodstock source for the conventional strategy and (2) the acclimation and release of juvenile spring Chinook salmon produced from the captive broodstock and conventional broodstock strategies In 2006, acclimation of Lostine River spring Chinook salmon smolts occurred from February 27, 2006 through to April 10, 2006 and a total of 240,568 smolts were acclimated and released. These smolts were produced from the brood year (BY) 2004 egg source and included captive brood (40,982) and conventional (199,586) origin smolts that were all progeny of Lostine River spring Chinook salmon. Operation of the Lostine River adult monitoring and collection facility in 2006 began May 15th, the first Chinook was captured on June 14, 2006 and the last Chinook was captured on September 27, 2006. The weir and trap were removed on October 1, 2006. A total of 534 adult Chinook, including jacks, were captured during the season. The composition of the run included 205 natural origin fish and 329 hatchery supplementation fish. There were no identified 'stray' hatchery fish from other programs trapped. Of the fish captured, 33 natural and 120 hatchery supplementation adults were retained for broodstock and transported to LGH for holding and spawning and 397 adult Chinook were passed or transported above the weir to spawn naturally. In 2006, no hatchery origin adult Chinook were transported and out planted in the Wallowa River and Bear Creek to spawn in under seeded habitat. In order to meet egg take goals for the conventional portion of the program, a determination was made that approximately 147 adults were needed for broodstock. As a result 16 (8 males and 8 females) of the 153 fish collected for broodstock were returned to the Lostine River to spawn naturally. Females that were spawned and provided the brood source were made up of 12 natural females and 45 supplementation females. One of these females tested positive for high levels of Bacterial Kidney Disease and consequently this females eggs were destroyed. The remaining females produced a total of 241,372 eggs at fertilization. Eye-up was 85.47% which yielded a total of 206,309 conventional program eyed eggs. The fecundity averaged 4,162 eggs per female. The brood year 2006 eggs will be incubated and reared at Lookingglass Hatchery until

Zollman, Richard L.; Eschler, Russell; Sealey, Shawn [Nez Perce Tribe

2009-03-31T23:59:59.000Z

77

Grande Ronde Endemic Spring Chinook Salmon Supplementation Project; Lostine River Operations and Maintenance 2003 Smolt Acclimation and Adult Return Report.  

DOE Green Energy (OSTI)

The Nez Perce Tribe (NPT), through funding provided by the Bonneville Power Administration (BPA), has implemented a Chinook salmon supplementation program (250,000 smolts) on the Lostine River, a tributary to the Grande Ronde River of Oregon. The Grande Ronde Endemic Spring Chinook Salmon Supplementation project, which involves supplementation of the Upper Grande Ronde River and Catherine Creek in addition to the Lostine River, was established to prevent extirpation and increase the number of threatened Snake River spring/summer Chinook salmon (Oncorhynchus tshawytscha) returning to the Grande Ronde River. This report covers the seventh season (1997-2003) of adult Chinook salmon broodstock collection in the Lostine River and the fifth season (1999-2003) of acclimating the resultant progeny. Production of Lostine River spring Chinook salmon smolts currently occurs at Lookingglass Fish Hatchery (LGH). The Lostine River supplementation program utilizes two strategies to obtain egg source for production of smolts for supplementation: captive broodstock and conventional broodstock. The captive broodstock strategy involves (1) capture of natural juvenile spring Chinook salmon smolts from the Lostine River, (2) rearing those to adult and spawning them, and (3) rearing the resultant progeny for eventual acclimation and release back into the Lostine River. The conventional broodstock strategy involves (1) capture of natural and hatchery origin adults returning to the Lostine River, (2) holding those adults and spawning them, and (3) rearing the resultant progeny for acclimation and release back into the Lostine River. This report focuses on (1) the trapping and collection of adult spring Chinook salmon that return to the Lostine River, which provides the broodstock source for the conventional strategy and (2) the acclimation and release of juvenile spring Chinook salmon produced from the captive broodstock and conventional broodstock strategies. In 2003, acclimation of Lostine River spring Chinook salmon smolts occurred from March 3, 2003 through to April 14, 2003 and a total of 242,776 smolts were acclimated and released. These smolts were produced from the brood year (BY) 2001 egg source and included captive broodstock (141,860) and conventional broodstock (100,916) origin smolts that were all progeny of Lostine River spring Chinook salmon. Operation of the Lostine River adult monitoring and collection facility in 2003 began April 30th, the first Chinook was captured on May 16, 2003 and the last Chinook was captured on September 21, 2003. The weir and trap were removed on October 1, 2003. A total of 464 adult Chinook, including jacks, were captured during the season. The composition of the run included 239 natural origin fish and 225 hatchery supplementation fish. There were no identified 'stray' hatchery fish from other programs trapped. Of the fish captured, 45 natural and 4 hatchery supplementation adults were retained for broodstock and transported to LGH for holding and spawning, 366 adult Chinook were passed or transported above the weir to spawn naturally, and 49 hatchery origin adult jack Chinook were transported and outplanted in the Wallowa River and Bear Creek to spawn in underseeded habitat. Of the 49 adults retained for broodstock at Lookingglass Hatchery, 21 natural females and no hatchery origin females were represented in spawning. These females produced a total of 106,609 eggs at fertilization. Eye-up was 95.50% which yielded a total of 101,811 conventional program eyed eggs. The fecundity averaged 5,077 eggs per female. These eggs were incubated and at Lookingglass Hatchery until eyed stage. At eye they were transferred to Oxbow Hatchery where they were reared to the fingerling state at which time they were transported back to LGH until they were smolts in the spring of 2005. Captive brood program eggs/fish will be added to the conventional program eggs to make up the entire juvenile release for the Lostine River program in 2005.

Zollman, Richard L.; Eschler, Russell; Sealey, Shawn [Nez Perce Tribe

2009-03-31T23:59:59.000Z

78

Grande Ronde Endemic Spring Chinook Salmon Supplementation Project; Lostine River Operations and Maintenance 2004 Smolt Acclimation and Adult Return Report.  

DOE Green Energy (OSTI)

The Nez Perce Tribe (NPT), through funding provided by the Bonneville Power Administration (BPA), has implemented a Chinook salmon supplementation program (250,000 smolts) on the Lostine River, a tributary to the Grande Ronde River of Oregon. The Grande Ronde Endemic Spring Chinook Salmon Supplementation project, which involves supplementation of the Upper Grande Ronde River and Catherine Creek in addition to the Lostine River, was established to prevent extirpation and increase the number of threatened Snake River spring/summer Chinook salmon (Oncorhynchus tshawytscha) returning to the Grande Ronde River. This report covers the eighth season (1997-2004) of adult Chinook salmon broodstock collection in the Lostine River and the sixth season (1999-2004) of acclimation of resulting Lostine River progeny. Production of Lostine River spring Chinook salmon smolts currently occurs at Lookingglass Fish Hatchery (LGH). The Lostine River supplementation program utilizes two strategies to obtain egg source for production of smolts for supplementation: captive broodstock and conventional broodstock. The captive broodstock strategy involves (1) capture of natural juvenile spring Chinook salmon smolts from the Lostine River, (2) rearing those to adult and spawning them, and (3) rearing the resultant progeny for eventual acclimation and release back into the Lostine River. The conventional broodstock strategy involves (1) capture of natural and hatchery origin adults returning to the Lostine River, (2) holding those adults and spawning them, and (3) rearing the resultant progency for acclimation and release back into the Lostine River. This report focuses on (1) the trapping and collection of adult spring Chinook salmon that return to the Lostine River, which provides the broodstock source for the conventional strategy and (2) the acclimation and release of juvenile spring Chinook salmon produced from the captive broodstock and conventional broodstock strategies. In 2004, acclimation of Lostine River spring Chinook salmon smolts occurred from March 1, 2004 through to April 14, 2004 and a total of 250,249 smolts were acclimated and released. These smolts were produced from the brood year (BY) 2002 egg source and included captive brood (133,781) and conventional (116,468) origin smolts that were all progeny of Lostine River spring Chinook salmon. Operation of the Lostine River adult monitoring and collection facility in 2004 began May 10, the first Chinook was captured on May 19, 2004 and the last Chinook was captured on September 16, 2004. The weir and trap were removed on October 1, 2004. A total of 1,091 adult Chinook, including jacks, were captured during the season. The composition of the run included 299 natural origin fish and 792 hatchery supplementation fish. There were no identified 'stray' hatchery fish from other programs trapped. Of the fish captured, 46 natural and 69 hatchery supplementation adults were retained for broodstock and transported to Lookingglass Hatchery for holding and spawning, 537 adult Chinook were passed or transported above the weir to spawn naturally, and 447 hatchery origin adult Chinook were transported and outplanted in the Wallowa River and Bear Creek to spawn in underseeded habitat. Of the 107 adults retained (eight additional hatchery females were collected and then later returned to the Lostine River to spawn naturally) for broodstock at Lookingglass Hatchery, 22 natural females and 30 supplementation females were represented in spawning. These females produced a total of 221,889 eggs at fertilization. Eye-up was 94.9% which yielded a total of 210,661 conventional program eyed eggs. The fecundity averaged 4,267 eggs per female. These eggs were incubated and at Lookingglass Hatchery until eyed stage and then transferred to Oxbow Hatchery where they will be reared to the fingerling stage. They will then be transported back to LGH and reared to the smolt stage and then transported to the Lostine acclimation facility for release in the spring of 2006. Captive brood program eggs/fish will be added to

Zollman, Richard L.; Eschler, Russell; Sealey, Shawn [Nez Perce Tribe

2009-03-31T23:59:59.000Z

79

Recycled rubber roads  

SciTech Connect

The paper describes several innovative approaches for recycling old tires in the construction of roads. In one, 18 inches of shredded tire chips (2 X 2 inches) were used on top of 6-8 inches of small stone to construct a road across a sanitary landfill. No compacting or linders were needed. In another application, sidewall mats linked together with steel strapping were used as a sub-base for a road across a swampy area. A third application uses 1/2 inch bits of groundup rubber tires as a replacement for aggregate in an asphalt road base.

Not Available

1989-02-01T23:59:59.000Z

80

RING ROAD SOUTH IVERSITY ROAD WEST  

E-Print Network (OSTI)

Webb ­ Earth Sciences R5 Aston Webb ­ B Block R6 Aston Webb ­ Great Hall R7 Aston Webb ­ C Block R8P P P Barber Institute ELSROAD M R.15 R.30 24h Security R.3 RING ROAD SOUTH U N IVERSITY ROAD WEST South Car Park P R21 R17 R18 R22 Main Library R19 R20R20 R23 R24R24 R25 Munrow Sport Centre R27 R26 R28

Sloman, Aaron

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

RING ROAD SOUTH IVERSITY ROAD WEST  

E-Print Network (OSTI)

­ Earth Sciences R5 Aston Webb ­ B Block R6 Aston Webb ­ Great Hall R7 Aston Webb ­ C Block R8 PhysicsP P P Barber Institute ELSROAD M R.15 R.30 24h Security R.3 RING ROAD SOUTH U N IVERSITY ROAD WEST South Car Park P R21 R17 R18 R22 Main Library R19 R2020 R23 R2424 R25 Munrow Sport Centre R27 R26 R28 R

Yao, Xin

82

NEPA REVIEW LASO-10-002 CATEGORICAL EXCLUSION PAJARITO ROAD RIGHT...  

National Nuclear Security Administration (NNSA)

relocated to the north of the new road segment pavement to minimize fi.rture maintenance costs and traffic disruption. The LANL Cultural Resources Team (CRT) has surveyed the...

83

Microsoft Word - CX-Hillscreek-LookoutPoint_AccessRoad_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nick Wenzl Line Foreman I - TFE-Alvey Line Foreman III - TFE-Alvey Proposed Action: Wood pole replacement and minor access road maintenance along portions of the Hills...

84

WILDLAND ROAD REMOVAL: RESEARCH NEEDS  

E-Print Network (OSTI)

Service. 2003. Road decommissioning monitoring report 2002.management agencies are decommissioning roads to mitigateto ten percent by decommissioning up to 160,000 kilometers

Switalski, T. Adam; Bissonette, John A.; DeLuca, Tom H.; Luce, Charles H.; Madej, Mary Ann

2003-01-01T23:59:59.000Z

85

Low-Maintenance Wind Power System  

E-Print Network (OSTI)

with widespread adoption of wind energy. The project hasProject: Low-Maintenance Wind Power System Summary of theImproved Vertical Axis Wind Turbine and Aerodynamic Control

Rasson, Joseph E

2010-01-01T23:59:59.000Z

86

Alice on the Road  

E-Print Network (OSTI)

downhill, sucking her little Prius into the whoosh of theirsqueeze it all into her Prius with whatever paraphernaliaher absolute upper limit in the Prius, when she saw the road

Satterly, Faye Ann

2012-01-01T23:59:59.000Z

87

Blair Road Kudzu  

NLE Websites -- All DOE Office Websites (Extended Search)

Plant Management: Blair Road and Hwy 58 Intersection * Kudzu treated with foliar spray of Garlon 3a and Tordon by CSC in 2004. Photo by Harry Quarles Invasive Non-native...

88

EA-1697: San Joaquin Valley Right-of-Way Project, California | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

97: San Joaquin Valley Right-of-Way Project, California 97: San Joaquin Valley Right-of-Way Project, California EA-1697: San Joaquin Valley Right-of-Way Project, California Summary DOE's Western Area Power Administration is preparing this EA to evaluate the environmental impacts of right-of-way maintenance (including facility inspection and repair, vegetation management, and equipment upgrades for transmission lines and associated rights-or-way, access roads, substations, and a maintenance facility) in the San Joaquin Valley in California. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download December 2, 2011 EA-1697: Finding of No Significant Impact Right-of-Way Maintenance in the San Joaquin Valley, California December 2, 2011 EA-1697: Final Environmental Assessment

89

Plant maintenance and advanced reactors issue, 2008  

Science Conference Proceedings (OSTI)

The focus of the September-October issue is on plant maintenance and advanced reactors. Major articles/reports in this issue include: Technologies of national importance, by Tsutomu Ohkubo, Japan Atomic Energy Agency, Japan; Modeling and simulation advances brighten future nuclear power, by Hussein Khalil, Argonne National Laboratory, Energy and desalination projects, by Ratan Kumar Sinha, Bhabha Atomic Research Centre, India; A plant with simplified design, by John Higgins, GE Hitachi Nuclear Energy; A forward thinking design, by Ray Ganthner, AREVA; A passively safe design, by Ed Cummins, Westinghouse Electric Company; A market-ready design, by Ken Petrunik, Atomic Energy of Canada Limited, Canada; Generation IV Advanced Nuclear Energy Systems, by Jacques Bouchard, French Commissariat a l'Energie Atomique, France, and Ralph Bennett, Idaho National Laboratory; Innovative reactor designs, a report by IAEA, Vienna, Austria; Guidance for new vendors, by John Nakoski, U.S. Nuclear Regulatory Commission; Road map for future energy, by John Cleveland, International Atomic Energy Agency, Vienna, Austria; and, Vermont's largest source of electricity, by Tyler Lamberts, Entergy Nuclear Operations, Inc. The Industry Innovation article is titled Intelligent monitoring technology, by Chris Demars, Exelon Nuclear.

Agnihotri, Newal (ed.)

2009-09-15T23:59:59.000Z

90

Landlord project multi-year program plan, fiscal year 1999, WBS 1.5  

SciTech Connect

The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The mission of Landlord Project is to provide more maintenance replacement of general infrastructure facilities and systems to facilitate the Hanford Site cleanup mission. Also, once an infrastructure facility or system is no longer needed the Landlord Project transitions the facility to final closure/removal through excess, salvage or demolition. Landlord Project activities will be performed in an environmentally sound, safe, economical, prudent, and reliable manner. The Landlord Project consists of the following facilities systems: steam, water, liquid sanitary waste, electrical distribution, telecommunication, sanitary landfill, emergency services, general purpose offices, general purpose shops, general purpose warehouses, environmental supports facilities, roads, railroad, and the site land. The objectives for general infrastructure support are reflected in two specific areas, (1) Core Infrastructure Maintenance, and (2) Infrastructure Risk Mitigation.

Dallas, M.D.

1998-09-22T23:59:59.000Z

91

The Road to 2010  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Road to 2010 Road to 2010 Addressing the nuclear question in the twenty first century July 2009 The Road to 2010 Addressing the nuclear question in the twenty first century Presented to Parliament by the Prime Minister, by Command of Her Majesty July 2009 Cm 7675 £14.35 Photograph on page 16 by EDF; © EDF Photograph on page 20 by BNFL; © BNFL, image from www.IAEA.org Photograph on page 26 by British Army; © Crown copyright/MoD, image from www.photos.mod.uk Photograph on page 34 by CTBTO; © CTBTO Preparatory Commission, image from www.CTBTO.org Photograph on pages 42 and 45 by Dean Calma; © Dean Calma, image from www.IAEA.org © Crown Copyright 2009 The text in this document (excluding the Royal Arms and other departmental or agency logos) may be reproduced free of

92

5 Inventory of Existing Activities This Chapter evaluates existing legal protections, projects, plans, and activities against  

E-Print Network (OSTI)

, forestry best management practices Forest Practices Act BPA Transmission system vegetation management BPA Transmission System Vegetation Management Program Final Environmental Impact Statement (2000) USFS Riparian and streams in forest management activities including road maintenance, road construction, chemical

93

The Bumpy Road to Hydrogen  

E-Print Network (OSTI)

It appears to us that hydrogen is a highly promising option06—16 The Bumpy Road to Hydrogen Daniel Sperling Joan OgdenThe Bumpy Road to Hydrogen 1 Daniel Sperling and Joan Ogden

Sperling, Dan; Ogden, Joan M

2006-01-01T23:59:59.000Z

94

Operations and Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operations and Maintenance Operations and Maintenance Operations and Maintenance October 16, 2013 - 5:01pm Addthis Project Construction Commissioning Operations & Maintenance Operations and maintenance (O&M) programs are critical to successfully integrating renewable energy into new Federal building construction and major renovations. This overview covers the importance of O&M programs for renewable energy projects, creating a successful O&M program, and identifying the right team to carry out the program. It highlights typical renewable energy issues and recommends following the design, specifications, and recommendations from product manufacturers. Key Actions in Operations and Maintenance Make O&M a priority to protect agency investment. Include O&M input in design reviews.

95

PELICAN ISLAND Graded dirt road  

E-Print Network (OSTI)

Audubon SanctuaryRecommended route A B C D E F 0.5 mile BOLIVAR PENINSULA N to Crystal Beach Paved road #12;Bryan Beach Old Brazos River 1 mile N Paved road Graded dirt road Walking path Dike/Berm Mudflat

Lee, Cin-Ty Aeolus

96

Pulverizer Maintenance Guide  

Science Conference Proceedings (OSTI)

The Pulverizer Maintenance Guide, Volume 3: Ball/Tube Mills provides fossil plant personnel with current maintenance information on ball/tube mills from different manufacturers. This guide will assist a plant in improving the maintenance of their pulverizer mills.

2006-03-31T23:59:59.000Z

97

On the Road with ARPA-E | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

On the Road with ARPA-E On the Road with ARPA-E On the Road with ARPA-E September 23, 2010 - 12:29pm Addthis ARPA-E Director Dr. Arun Majumdar and MSU Project Lead Dr. Norbert Mueller test the wave disk engine. ARPA-E Director Dr. Arun Majumdar and MSU Project Lead Dr. Norbert Mueller test the wave disk engine. Dr. Arun Majumdar Dr. Arun Majumdar Former Director, Advanced Research Projects Agency - Energy Auto enthusiasts should be forewarned that this post may make you jealous. I say that because earlier this month I traveled to Michigan to visit two projects ARPA-E is currently funding - one at Michigan State University (MSU), the second at General Motors (GM), and got an up close look at several innovative transportation-related energy advancements. While at MSU, I had the op portunity to tour the facility where the wave

98

Cylinder Surveillance and Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Surveillance and Maintenance Cylinder Surveillance and Maintenance DOE has a Cylinder Management program in place to inspect and maintain depleted UF6 cylinders, and to improve...

99

RING ROAD SOUTH CHANCELLOR'S  

E-Print Network (OSTI)

Sciences R5 Aston Webb ­ B Block R6 Aston Webb ­ Great Hall R7 Aston Webb ­ C Block R8 Physics West R9P P 24-h Security R3 RING ROAD SOUTH CHANCELLOR'S COURT CHANCELLOR'S University Centre COURT Sports PitchesSports Pitches South Car Park R21 R17 R18 R22 Main Library R19 R23 R24 R 24 R14 R15 R16 East Gate O

Heinke, Dietmar

100

Implementing lean methodologies within a maintenance organization  

E-Print Network (OSTI)

The primary goal of the project was to make the machine maintenance process more efficient. In order to do this, we conducted a 3-day Value Stream Mapping workshop, during which we generated a map of the present value ...

Levine, Dana Ari

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Road Decommissioning: Minimising the Adverse Ecological Effects of Roads i9n European Agriculture Landscapes  

E-Print Network (OSTI)

road corridors post-decommissioning, especially those roadsof RRE - that of road decommissioning. To date even thoughFor this reason, road decommissioning can potentially: (1)

Dolan, Lisa; Whelan, Pádraig M.

2007-01-01T23:59:59.000Z

102

EA-1966: Sunflower Wind Project, Hebron, North Dakota  

Energy.gov (U.S. Department of Energy (DOE))

Western Area Power Administration (Western) is preparing an EA to evaluate potential environmental impacts of interconnecting a proposed 80 MW generating facility south of Hebron in Morton and Stark Counties, North Dakota. The proposed wind generating facility of 30-50 wind turbines would encompass approximately 9,000 acres. Ancillary facilities would include an underground collection line system, a project substation, one mile of new transmission line, a new switchyard facility on the existing Dickinson-Mandan 230 kV line owned and operated by Western, one permanent meteorological tower, new access roads, and an operations and maintenance building.

103

Station Living Program, RCM, and the maintenance rule  

Science Conference Proceedings (OSTI)

A project is being conducted at Boston Edison's Pilgrim nuclear power station (PNPS) to develop, implement, and demonstrate the effectiveness of a Station Living Program and the US Nuclear Regulatory Commission (NRC) maintenance rule. This project is a collaborative effort by PNPS, the Electric Power Corp, and Quadrex Energy Series Corporation. In parallel, a preventive maintenance optimization project utilizing reliability-centered maintenance (RCM) is being performed on [approximately]90% of the plant's systems. These two projects are being combined as a major cornerstone at PNPS in the implementation of the NRC maintenance rule.

Kleam, J. (Boston Edison Co., Plymouth, MA (United States)); Anderson, J. (Quadrex Energy Services Corp., Campbell, CA (United States))

1993-01-01T23:59:59.000Z

104

Facilities Maintenance Guide  

Science Conference Proceedings (OSTI)

The subject of facilities maintenance is very broad and is commonly interpreted quite differently among maintenance managers at power plants and U.S. Department of Energy (DOE) nuclear and process facilities. In many cases, the maintenance of administrative buildings, support structures, and "real property" is managed separately from the maintenance of process equipment. The scope and breadth of each maintenance program varies from site to site, as does the formality of the program established to address...

2004-09-16T23:59:59.000Z

105

EA-1966: Sunflower Wind Project, Hebron, North Dakota | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Sunflower Wind Project, Hebron, North Dakota 6: Sunflower Wind Project, Hebron, North Dakota EA-1966: Sunflower Wind Project, Hebron, North Dakota SUMMARY Western Area Power Administration (Western) is preparing an EA to evaluate potential environmental impacts of interconnecting a proposed 80 MW generating facility south of Hebron in Morton and Stark Counties, North Dakota. The proposed wind generating facility of 30-50 wind turbines would encompass approximately 9,000 acres. Ancillary facilities would include an underground collection line system, a project substation, one mile of new transmission line, a new switchyard facility on the existing Dickinson-Mandan 230 kV line owned and operated by Western, one permanent meteorological tower, new access roads, and an operations and maintenance building.

106

Ash Handling System Maintenance Guide  

Science Conference Proceedings (OSTI)

This Ash Handling System Maintenance Guide provides fossil plant maintenance personnel with current maintenance information on this system. This guide will assist plant maintenance personnel in improving the reliability and reducing the maintenance costs for the ash handling system.

2005-12-23T23:59:59.000Z

107

Autonomous Robotic Vehicle Road Following  

Science Conference Proceedings (OSTI)

A description is given of the system architecture of an autonomous vehicle and its real-time adaptive vision system for road-following. The vehicle is a 10-ton armored personnel carrier modified for robotic control. A color transformation that best discriminates ... Keywords: adaptive systems, adaptive vision system, armored personnel carrier, autonomous vehicle, color transformation, computer vision, computerised navigation, computerised pattern recognition, image coordinate system, image segmentation, maximum-likelihood pixel classification, military systems, real-time, road region boundary, road vehicles, road-following, robotic vehicle, robots

D. Kuan; G. Phipps; A.-C. Hsueh

1988-09-01T23:59:59.000Z

108

Road to Net Zero (Presentation)  

Science Conference Proceedings (OSTI)

A PowerPoint presentation on NREL's Research Support Facility (RSF) and the road to achieving net zero energy for new construction.

Glover, B.

2011-05-01T23:59:59.000Z

109

Baxter Creek Gateway Park: assessment of an urban stream restoration project  

E-Print Network (OSTI)

Restoration Project: Maintenance and Management Guide. Citythe Baxter Creek Maintenance and Management Guide and thatEOA, 2005), Maintenance & Management Guide (El Cerrito,

Goodman, Judd; Lunde, Kevin B; Zaro, Theresa

2006-01-01T23:59:59.000Z

110

Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994  

SciTech Connect

This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work.

Fisk, E.L.

1994-06-01T23:59:59.000Z

111

Reliability-based maintenance evaluations and standard preventive maintenance programs  

SciTech Connect

Due to recent issuance of 10CFR50.65, the U.S. Nuclear Regulatory Commission maintenance rule (Rule), and the [open quotes]Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants[close quotes] prepared by the Nuclear Management and Resources Council, many utilities are undertaking review or evaluation of current preventive maintenance (PM) programs. Although PM optimization and documentation are not specifically required by the Rule, an appropriate and effective PM program (PMP) will be the cornerstone of the successful and cost-effective implementation of the Rule. Currently, a project is being conducted at the Vermont Yankee Nuclear Power Station (VYNPS) in conjunction with Quadrex Energy Services to evaluate, optimize, and document the PMP. The project began in March 1993 and is scheduled for completion in mid-1995. The initial scope for the project is the evaluation of those structures, systems, and components that are within the scope of the Rule. Because of the number of systems to be evaluated ([approximately]50), the desired completion schedule, and cost considerations, a streamlined approach to PM optimization and documentation is being utilized.

Varno, M. (Vermont Yankee Nuclear Power Corp., Vernon, VT (United States)); McKinley, M. (Quadrex Energy Services Corp., Campbell, CA (United States))

1993-01-01T23:59:59.000Z

112

Feedwater Heater Maintenance Guide  

Science Conference Proceedings (OSTI)

This guide provides plant personnel with information on the operation, maintenance, and performance of feedwater heaters. The contents of this guide will assist plant personnel in improving feedwater heater reliability, performance, and maintenance practices.

2002-05-29T23:59:59.000Z

113

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 2  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 2 Sajal S. Pokharel, Gary A Alpharetta, Georgia 30022 CRC Project No. E-23-4 #12;On-Road Remote Sensing in the Denver Area: Year 2 2 EXECUTIVE SUMMARY The University of Denver has completed the second year of a five-year remote sensing study

Denver, University of

114

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 3  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 3 Sajal S. Pokharel, Gary A Alpharetta, Georgia 30022 CRC Project No. E-23-4 #12;On-Road Remote Sensing in the Denver Area: Year 3 2 EXECUTIVE SUMMARY The University of Denver has completed the third year of a multi-year remote sensing study

Denver, University of

115

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 1  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 1 Peter J. Popp, Sajal S Center Parkway Atlanta, Georgia 30346 CRC Project No. E-23-4-99 #12;On-Road Remote Sensing in the Denver-year remote sensing study in the Denver area. The remote sensor used in this study is capable of measuring

Denver, University of

116

Life cycle assessment of LED road lighting.  

E-Print Network (OSTI)

???It is observed that the power consumption of road lighting is increased with the length of trafficable road in Hong Kong. The energy used in… (more)

Chan, Ho-kan.

2012-01-01T23:59:59.000Z

117

Open source software development and maintenance: an exploratory analysis  

E-Print Network (OSTI)

The purpose of this research was to create measures and models for the evaluation of Open Source Software (OSS) projects. An exploratory analysis of the development and maintenance processes in OSS was conducted for this purpose. Data mining and text mining techniques were used to discover knowledge from transactional datasets maintained on OSS projects. Large and comprehensive datasets were used to formulate, test and validate the models. A new multidimensional measure of OSS project performance, called project viability was defined and validated. A theoretical and empirical measurement framework was used to evaluate the new measure. OSS project data from SourceForge.net was used to validate the new measure. Results indicated that project viability is a measure of the performance of OSS projects. Three models were then created for each dimension of project viability. Multiple data mining techniques were used to create the models. Variables identified from process, product, resource and end-user characteristics of the project were used. The use of new variables created through text mining improved the performance of the models. The first model was created for OSS projects in the development phase. The results indicated that end-user involvement could play a significant role in the development of OSS projects. It was also discovered that certain types of projects are more suitable for development in OSS communities. The second model was developed for OSS projects in their maintenance phase. A two-stage model for maintenance performance was selected. The results indicated that high project usage and usefulness could improve the maintenance performance of OSS projects. The third model was developed to investigate the affects of maintenance activities on the project internal structure. Maintenance data for Linux project was used to develop a new taxonomy for OSS maintenance patches. These results were then used to study the affects of various types of patches on the internal structure of the software. It was found that performing proactive maintenance on the software moderates its internal structure.

Raja, Uzma

2006-08-01T23:59:59.000Z

118

Electricity for road transport, flexible power systems and wind power  

Open Energy Info (EERE)

road transport, flexible power systems and wind power road transport, flexible power systems and wind power (Smart Grid Project) Jump to: navigation, search Project Name Electricity for road transport, flexible power systems and wind power Country Denmark Coordinates 56.26392°, 9.501785° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":56.26392,"lon":9.501785,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

119

Sootblowing Maintenance Guide  

Science Conference Proceedings (OSTI)

This guide provides information concerning good maintenance practices, condition monitoring, predictive and preventive techniques, probable failure modes, and troubleshooting guidance to personnel involved in the maintenance of sootblowing systems and their components. This guide was developed to provide basic information as well as detailed maintenance and troubleshooting information.

2001-12-20T23:59:59.000Z

120

Duck Valley Reservoirs Fish Stocking and Operation and Maintenance, 2006-2007 Annual Progress Report.  

DOE Green Energy (OSTI)

The Duck Valley Reservoirs Fish Stocking and Operations and Maintenance (DV Fisheries) project is an ongoing resident fish program that serves to partially mitigate the loss of anadromous fish that resulted from downstream construction of the hydropower system. The project's goals are to enhance subsistence fishing and educational opportunities for Tribal members of the Shoshone-Paiute Tribes and provide resident fishing opportunities for non-Tribal members. In addition to stocking rainbow trout (Oncorhynchus mykiss) in Mountain View, Lake Billy Shaw, and Sheep Creek Reservoirs, the program is also designed to maintain healthy aquatic conditions for fish growth and survival, to provide superior facilities with wilderness qualities to attract non-Tribal angler use, and to offer clear, consistent communication with the Tribal community about this project as well as outreach and education within the region and the local community. Tasks for this performance period are divided into operations and maintenance plus monitoring and evaluation. Operation and maintenance of the three reservoirs include fences, roads, dams and all reservoir structures, feeder canals, water troughs and stock ponds, educational signs, vehicles and equipment, and outhouses. Monitoring and evaluation activities included creel, gillnet, wildlife, and bird surveys, water quality and reservoir structures monitoring, native vegetation planting, photo point documentation, control of encroaching exotic vegetation, and community outreach and education. The three reservoirs are monitored in terms of water quality and fishery success. Sheep Creek Reservoir was very unproductive this year as a fishery. Fish morphometric and water quality data indicate that the turbidity is severely impacting trout survival. Lake Billy Shaw was very productive as a fishery and received good ratings from anglers. Mountain View was also productive and anglers reported a high number of quality sized fish. Water quality (specifically dissolved oxygen and temperature) is the main limiting factor in our fisheries.

Sellman, Jake; Dykstra, Tim [Shoshone-Paiute Tribes

2009-05-11T23:59:59.000Z

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Exploring the Standard Model Exploring the Standard Model       You've heard a lot about the Standard Model and the pieces are hopefully beginning to fall into place. However, even a thorough understanding of the Standard Model is not the end of the story but the beginning. By exploring the structure and details of the Standard Model we encounter new questions. Why do the most fundamental particles have the particular masses we observe? Why aren't they all symmetric? How is the mass of a particle related to the masses of its constituents? Is there any other way of organizing the Standard Model? The activities in this project will elucidate but not answer our questions. The Standard Model tells us how particles behave but not necessarily why they do so. The conversation is only beginning. . . .

122

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

Activity HEV Fleet Testing Date Mileage Description Cost 11212012 1,582 Replaced one tire due to road hazard 201.66 12102012 4,291 Replaced brake line - under warranty NC 3...

123

Snow and Ice Control Best Management Practices Parking Lots, Sidewalks, Roads  

E-Print Network (OSTI)

Snow and Ice Control Best Management Practices Parking Lots, Sidewalks, Roads Minnesota Circuit opportunity to improve the way we manage snow and ice in Minnesota. By using snow and ice control best safer--while saving money and protecting water quality. Current Situation The snow and ice maintenance

Minnesota, University of

124

Predictive Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Maintenance Maintenance Predictive Maintenance October 7, 2013 - 9:46am Addthis Predictive maintenance aims to detect equipment degradation and address problems as they arise. The result indicates potential issues, which are controlled or eliminated prior to any significant system deterioration. Predictive maintenance differs from preventive maintenance because maintenance is based on the condition of the machine instead of a preset schedule. This eliminates the unneeded maintenance concerns of preventive programs. Several predictive maintenance technologies are available. Federal agencies can leverage a combination of these technologies within their maintenance programs. Advantages A well-executed predictive maintenance program can almost eliminate catastrophic equipment failure because issues are identified and eliminated

125

VNG's Hampton Roads Pipeline Crossing  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

VNG's Hampton Roads Pipeline Crossing VNG's Hampton Roads Pipeline Crossing FUPWG Conference Fall 2008 Williamsburg, Virginia Connection to DTI at Quantico Columbia Limitations South Hampton Roads served by a single pipeline Southside dependent on back up systems LNG Propane/air Two supply sources to VNG What if we connected pipelines? It would take Two Water Crossings Two Compressor Stations Construction in densely populated cities It could Deliver over 200,000 Dth of incremental supply Serve VNG, Columbia and Dominion customers ...we would get... Hampton Roads Crossing - HRX Hampton / Newport News Craney Island Norfolk 21 miles of 24" pipe 7 miles in Hampton/Newport News 4 miles in Norfolk 10 miles of water and island crossing 4 mile harbor crossing 4.5 miles on Craney

126

Johnson Creek Artificial Propagation and Enhancement Project Operations and Maintenance Program; Brood Year 1998: Johnson Creek Chinook Salmon Supplementation, Biennial Report 1998-2000.  

DOE Green Energy (OSTI)

The Nez Perce Tribe, through funding provided by the Bonneville Power Administration, has implemented a small scale chinook salmon supplementation program on Johnson Creek, a tributary in the South Fork of the Salmon River, Idaho. The Johnson Creek Artificial Propagation Enhancement project was established to enhance the number of threatened Snake River summer chinook salmon (Oncorhynchus tshawytscha) returning to Johnson Creek through artificial propagation. Adult chinook salmon collection and spawning began in 1998. A total of 114 fish were collected from Johnson Creek and 54 fish (20 males and 34 females) were retained for Broodstock. All broodstock were transported to Lower Snake River Compensation Plan's South Fork Salmon River adult holding and spawning facility, operated by the Idaho Department of Fish and Game. The remaining 60 fish were released to spawn naturally. An estimated 155,870 eggs from Johnson Creek chinook spawned at the South Fork Salmon River facility were transported to the McCall Fish Hatchery for rearing. Average fecundity for Johnson Creek females was 4,871. Approximately 20,500 eggs from females with high levels of Bacterial Kidney Disease were culled. This, combined with green-egg to eyed-egg survival of 62%, resulted in about 84,000 eyed eggs produced in 1998. Resulting juveniles were reared indoors at the McCall Fish Hatchery in 1999. All of these fish were marked with Coded Wire Tags and Visual Implant Elastomer tags and 8,043 were also PIT tagged. A total of 78,950 smolts were transported from the McCall Fish Hatchery and released directly into Johnson Creek on March 27, 28, 29, and 30, 2000.

Daniel, Mitch; Gebhards, John

2003-05-01T23:59:59.000Z

127

Johnson Creek Artificial Propagation and Enhancement Project Operations and Maintenance Program; Brood Year 2000: Johnson Creek Chinook Salmon Supplementation, Biennial Report 2000-2002.  

DOE Green Energy (OSTI)

The Nez Perce Tribe, through funding provided by the Bonneville Power Administration, has implemented a small scale chinook salmon supplementation program on Johnson Creek, a tributary in the South Fork of the Salmon River, Idaho. The Johnson Creek Artificial Propagation Enhancement project was established to enhance the number of threatened Snake River summer chinook salmon (Oncorhynchus tshawytscha) returning to Johnson Creek through artificial propagation. Adult chinook salmon trapping, broodstock selection, and spawning was first implemented in 1998, did not occur in 1999, and was resumed in 2000. A total of 152 salmon were trapped in Johnson Creek in 2000, of which 73 (25 males, 16 females, and 32 jacks) fish were transported to Idaho Fish and Game=s South Fork Salmon River adult holding and spawning facility for artificial propagation purposes. The remaining 79 (29 males, 16 females, and 24 jacks) fish were released above the weir to spawn naturally. A total of 65,060 green eggs were taken from 16 female salmon and transported to the McCall Fish Hatchery for incubation and rearing. Egg counts indicated an average eye-up rate of 86.0% for 55,971 eyed eggs. Average fecundity for Johnson Creek females was 4,066 eggs per female. Juvenile fish were reared indoors at the McCall Fish Hatchery through November 2001. These fish were transferred to outdoor rearing facilities in December 2001 where they remained until release in March 2002. All of these fish were marked with Coded Wire Tags and Visual Implant Elastomer tags. In addition 9,987 were also PIT tagged. Hand counts provided by marking crews were used to amend the number of juvenile salmon released from the original egg count. A total of 57,392 smolts were released into a temporary acclimation channel in Johnson Creek on March 18, 19, 20, 2002. These fish were held in this facility until a fish screen was removed on March 22, 2002 and the fish were allowed to emigrate.

Daniel, Mitch; Gebhards, John; Hill, Robert

2003-05-01T23:59:59.000Z

128

Using Daylight to Light the Access Zone of Road Tunnels  

NLE Websites -- All DOE Office Websites (Extended Search)

Using Daylight to Light the Access Zone of Road Tunnels Using Daylight to Light the Access Zone of Road Tunnels Speaker(s): Eliyahu Ne'eman Date: March 4, 2003 - 12:00pm Location: Bldg. 90 Lighting guides for roadway tunnels specify relatively high luminances for the "access zone" into the tunnel. They are needed to allow the eyes of the driver sufficient time to adapt during the short period of the transition from the outdoor natural daylight levels to the fairly low luminances along the main length of the tunnel. Usually, the necessary high luminances are provided by rows of costly luminaries which consume a lot of electricity during peak use periods and need a good deal of maintenance. To save some electric power, controls are used to dim the lighting on cloudy hours. Daylight has been used for the access zone in several tunnels around the

129

Maintenance Effectiveness Assessment  

Science Conference Proceedings (OSTI)

Utilities want to know whether their equipment is being maintained in the most effective manner. Understanding the relationship between maintenance costs and benefits becomes even more important when established practices and schedules change. This report defines the problem of and presents a roadmap for the development of metrics for evaluating substation equipment maintenance effectiveness. A proposed suite of tools for assessing maintenance effectiveness TAME can provide a business analytics framework...

2010-12-23T23:59:59.000Z

130

Status of fusion maintenance  

SciTech Connect

Effective maintenance will be an essential ingredient in determining fusion system productivity. This level of productivity will result only after close attention is paid to the entire system as an entity and appropriate integration of the elements is made. The status of fusion maintenance is reviewed in the context of the entire system. While there are many challenging developmental tasks ahead in fusion maintenance, the required technologies are available in several high-technology industries, including nuclear fission.

Fuller, G.M.

1984-01-01T23:59:59.000Z

131

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

Maintenance Sheet for 2013 Nissan Leaf Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 5142013 456 Replaced right front strut NC...

132

Data Base Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Database Maintenance Keys Page anyone in Site Operations Building Management (see Personnel) with your room number. If you are locked out during off-hours, contact Security on...

133

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

3CE000672 Maintenance Sheet for 2013 Honda Civic CNG Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 6102013 7,426...

134

RM Maintenance Services  

NLE Websites -- All DOE Office Websites (Extended Search)

maintenance forces are responsible for over 118 substations and almost 5300 miles of transmission lines. The Rocky Mountain Region recently updated its Metering Policy. Its...

135

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

0DU103929 Maintenance Sheet for 2013 Chevrolet Volt Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 342013 4,876 Replaced relay assembly, engine...

136

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

6DU111078 Maintenance Sheet for 2013 Chevrolet Volt Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 2192013 8,362 Changed oil - under warranty...

137

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

XBU100914 Maintenance Sheet for 2011 Chevrolet Volt Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 6192012 14,694 Replaced one tire and rotated...

138

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

2DU113491 Maintenance Sheet for 2013 Chevrolet Volt Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 2192013 8,466 Changed oil - under warranty...

139

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

XDU104313 Maintenance Sheet for 2013 Chevrolet Volt Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 2182013 8,513 Changed oil - under warranty...

140

Duck Valley Reservoirs Fish Stocking and Operation and Maintenance, 2005-2006 Annual Progress Report.  

DOE Green Energy (OSTI)

The Duck Valley Reservoirs Fish Stocking and Operations and Maintenance (DV Fisheries) project is an ongoing resident fish program designed to enhance both subsistence fishing, educational opportunities for Tribal members of the Shoshone-Paiute Tribes, and recreational fishing facilities for non-Tribal members. In addition to stocking rainbow trout (Oncorhynchus mykiss) in Mountain View, Lake Billy Shaw, and Sheep Creek Reservoirs, the program also intends to afford and maintain healthy aquatic conditions for fish growth and survival, to provide superior facilities with wilderness qualities to attract non-Tribal angler use, and to offer clear, consistent communication with the Tribal community about this project as well as outreach and education within the region and the local community. Tasks for this performance period are divided into operations and maintenance plus monitoring and evaluation. Operation and maintenance of the three reservoirs include fences, roads, dams and all reservoir structures, feeder canals, water troughs and stock ponds, educational signs, vehicles and equipment, and outhouses. Monitoring and evaluation activities included creel, gillnet, wildlife, and bird surveys, water quality and reservoir structures monitoring, native vegetation planting, photo point documentation, control of encroaching exotic vegetation, and community outreach and education. The three reservoirs are monitored in terms of water quality and fishery success. Sheep Creek Reservoir was the least productive as a result of high turbidity levels and constraining water quality parameters. Lake Billy Shaw trout were in poorer condition than in previous years potentially as a result of water quality or other factors. Mountain View Reservoir trout exhibit the best health of the three reservoirs and was the only reservoir to receive constant flows of water.

Sellman, Jake; Dykstra, Tim [Shoshone-Paiute Tribes

2009-05-11T23:59:59.000Z

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Project 301  

NLE Websites -- All DOE Office Websites (Extended Search)

2006 2006 Combustion Technologies CONTACTS Robert R. Romanosky Advanced Research Technology Manager National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507 304-285-4721 robert.romanosky@netl.doe.gov Arun C. Bose Project Manager National Energy Technology Laboratory 626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236 412-386-4467 arun.bose@netl.doe.gov ADVANCED, LOW/ZERO EMISSION BOILER DESIGN AND OPERATION Background Over the past years, environmental concerns regarding pollutants have grown dramatically. Current annual greenhouse gas (GHG) emissions are 12% higher than they were in 1992. In addition, carbon dioxide (CO 2 ) emissions are projected to increase by an additional 34% over the next 20 years. About one third of carbon emissions in the

142

Substation Reliability Centered Maintenance  

SciTech Connect

Substation Reliability Centered Maintenance (RCM) is a technique that is used to develop maintenance plans and criteria so the operational capability of substation equipment is achieved, restored, or maintained. The objective of the RCM process is to focus attention on system equipment in a manner that leads to the formulation of an optimal maintenance plan. The RCM concept originated in the airline industry in the 1970s and has been used since 1985 to establish maintenance requirements for nuclear power plants. The RCM process is initially applied during the design and development phase of equipment or systems on the premise that reliability is a design characteristic. It is then reapplied, as necessary, during the operational phase to sustain a more optimal maintenance program based on actual field experiences. The purpose of the RCM process is to develop a maintenance program that provides desired or specified levels of operational safety and reliability at the lowest possible overall cost. The objectives are to predict or detect and correct incipient failures before they occur or before they develop into major defects, reduce the probability of failure, detect hidden problems, and improve the cost-effectiveness of the maintenance program. RCM accomplishes two basic purposes: (1) It identifies in real-time incipient equipment problems, averting potentially expensive catastrophic failures by communicating potential problems to appropriate system operators and maintenance personnel. (2) It provides decision support by recommending, identifying, and scheduling preventive maintenance. Recommendations are based on maintenance criteria, maintenance history, experience with similar equipment, real-time field data, and resource constraints. Hardware and software are used to accomplish these two purposes. The RCM system includes instrumentation that monitors critical substation equipment as well as computer software that helps analyze equipment data.

Purucker, S.L.

1992-11-01T23:59:59.000Z

143

Nuclear Maintenance Applications Center: Condenser Air Removal Equipment Maintenance Guide  

Science Conference Proceedings (OSTI)

The Condenser Air Removal Equipment Maintenance Guide provides power plant maintenance personnel with current maintenance information on this system. This guide will assist the plant maintenance personnel in improving reliability and reducing maintenance costs for the condenser air removal (CAR) equipment.

2007-12-21T23:59:59.000Z

144

Suggested Talking Points for Hydrogen Road Tour | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Suggested Talking Points for Hydrogen Road Tour Suggested Talking Points for Hydrogen Road Tour Suggested Talking Points for Hydrogen Road Tour More Documents & Publications...

145

Virginia EV Road Show - PHEV Operations and Performance  

NLE Websites -- All DOE Office Websites (Extended Search)

- Virginia EV Road Show - PHEV Operations and Performance Jim Francfort Virginia Clean Cities and Hampton Roads Clean Cities Coalition - Virginia Electric Drive Road Show Poquoson,...

146

Nuclear Maintenance Applications Center: Condenser Cleaning Equipment Maintenance Guide  

Science Conference Proceedings (OSTI)

This report provides power plant maintenance personnel with current maintenance information on condenser cleaning systems. The report will help these personnel to improve the reliability and reduce the maintenance costs for the condenser cleaning equipment used in power plants.

2007-12-21T23:59:59.000Z

147

Guidelines for Transitioning from Time-Based Maintenance to Condition-Based Maintenance  

Science Conference Proceedings (OSTI)

BackgroundUtilities have provided feedback to the Electric Power Research Institute (EPRI) that they do not feel that they have fully capitalized on past optimization projects. Current living programs using classical predictive maintenance technologies, component and system testing programs, existing maintenance backlogs, system monitoring, system health, and operator feedback to provide a more complete picture of equipment condition may be providing more insight into ...

2013-11-13T23:59:59.000Z

148

Operations and Maintenance Manual | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Manual Manual Operations and Maintenance Manual October 16, 2013 - 5:00pm Addthis Closeout of the construction phase for renewable energy projects includes the creation of a comprehensive operations and maintenance (O&M) manual. Although specific content varies depending on the size, scope, and complexity of the project, the O&M manual typically includes manufacturer literature, basic operating procedures, troubleshooting techniques, measurement and verification (M&V) system documentation, and maintenance information. The general contractor should compile O&M documentation, gather as-built drawings for equipment and systems, and take the lead in organizing the manual. The commissioning agent reviews the manual to verify that it includes all necessary documentation, including:

149

USVI Energy Road Map: Charting the Course to a Clean Energy Future  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

USVI Energy Road Map: Charting the Course to a Clean Energy Future USVI Energy Road Map: Charting the Course to a Clean Energy Future (Brochure), EDIN (Energy Development in Island Nations), U.S. Virgin Islands USVI Energy Road Map: Charting the Course to a Clean Energy Future (Brochure), EDIN (Energy Development in Island Nations), U.S. Virgin Islands This brochure provides an overview of the integrated clean energy deployment process and progress of the Energy Development in Island Nations U.S. Virgin Islands pilot project road map, including over-arching goals, organization, strategy, technology-specific goals and accomplishments, challenges, solutions, and upcoming milestones. edinusvi_roadmap.pdf More Documents & Publications U.S. Virgin Islands Energy Road Map: Analysis Integrating Renewable Energy into the Transmission and Distribution System

150

USVI Energy Road Map: Charting the Course to a Clean Energy Future  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

USVI Energy Road Map: Charting the Course to a Clean Energy Future USVI Energy Road Map: Charting the Course to a Clean Energy Future (Brochure), EDIN (Energy Development in Island Nations), U.S. Virgin Islands USVI Energy Road Map: Charting the Course to a Clean Energy Future (Brochure), EDIN (Energy Development in Island Nations), U.S. Virgin Islands This brochure provides an overview of the integrated clean energy deployment process and progress of the Energy Development in Island Nations U.S. Virgin Islands pilot project road map, including over-arching goals, organization, strategy, technology-specific goals and accomplishments, challenges, solutions, and upcoming milestones. edinusvi_roadmap.pdf More Documents & Publications U.S. Virgin Islands Energy Road Map: Analysis Integrating Renewable Energy into the Transmission and Distribution System

151

Comparison of dynamometer power absorption characteristics and vehicle road load measurements  

SciTech Connect

The report presents vehicle road load force versus speed curves and Clayton dynamometer force versus speed curves. The vehicle road load force data were collected in the recent road load project, where the vehicle road load, as a function of speed, was determined for sixty-three light-duty vehicles. The dynamometer data were obtained from the six EPA certification dynamometers. This data is first used to generate an equation to represent an average emission dynamometer. The variations of the individual dynamometers about this average dynamometer curve are discussed. Subsequently, each vehicle curve is compared to this average dynamometer curve. Variations between different vehicles are discussed, and the possible intrinsic error caused by differences between the shape of the dynamometer force versus speed curve and the typical vehicle road load curve is investigated.

Thompson, G.D.; Torres, M.

1977-07-01T23:59:59.000Z

152

Condenser Application and Maintenance Guide  

Science Conference Proceedings (OSTI)

The Condenser Application and Maintenance Guide provides plant personnel with information on the operation, maintenance, and performance of condensers. The contents of this guide will assist plants in improving condenser performance, reducing maintenance costs, and increasing condenser reliability.

2001-08-23T23:59:59.000Z

153

Maintenance | OpenEI Community  

Open Energy Info (EERE)

Maintenance Home Rmckeel's picture Submitted by Rmckeel(297) Contributor 8 March, 2013 - 14:23 OpenEI maintenance March 8-9, 2013 developer Maintenance OpenEI We would like to...

154

The Impact of Maintenance on Packaged Unitary Equipment  

Science Conference Proceedings (OSTI)

This report summarizes the findings of a two-year study of the energy and demand impacts of maintenance on rooftop packaged heating and cooling equipment. The purpose of the project was to determine if energy consumption and peak demand reductions could be reliably obtained through the implementation of proper maintenance on unitary packaged equipment in the three to ten ton range.

1997-05-29T23:59:59.000Z

155

Maintenance Work Management Improvement: Improving Culture and Work Process  

Science Conference Proceedings (OSTI)

EPRI's Plant Maintenance Optimization (PMO) mission is to develop and demonstrate products and services for improved use of power plant maintenance resources and increased profitability. Based on a series of work management improvement projects, EPRI plans to develop a best practices guideline. As part of this effort, this document details how to improve fossil power plant work culture and work processes.

1998-06-16T23:59:59.000Z

156

Adaptive Routing for Road Traffic  

Science Conference Proceedings (OSTI)

Several technologies for motorists ease their travel on today's congested roads. However, these services aren't linked to each other and using them while driving can be dangerously distracting. This article reports on an integrated system that uses congestion ... Keywords: routing, congestion, Trafficmaster, GPS, GSM.

John Fawcett; Peter Robinson

2000-05-01T23:59:59.000Z

157

CHESTNUT RIDGE RD VALLEY ROAD  

E-Print Network (OSTI)

.1 Miles 0.20 N Miles 0.20 TO MELTON VALLEY DRIVE HFIR PARKING WALK-IN ENTRY 7900 7964K - HFIR USER OFFICE RM 18 7972 HFIR High Flux Isotope Reactor 7962 HFIR User Office: 865-574-4523 BETHEL VALLEY RD BETHEL VALLEY RD BETHEL VALLEY RD RAMSEY DRIVE EGERACCESSROAD MELTON VALLEY DRIVE MELTON VALLEY ACCESS ROAD HFIR

158

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

0CE002590 Maintenance Sheet for 2013 Honda Civic CNG Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 1252013 7,925 Changed oil and filter and...

159

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

7CE000612 Maintenance Sheet for 2013 Honda Civic CNG Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 1172013 6,327 Changed oil and filter and...

160

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

5CE002486 Maintenance Sheet for 2013 Honda Civic CNG Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 212013 7,892 Changed oil and filter and...

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

DU2A5010462 Maintenance Sheet for 2010 Toyota Prius Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 11232009 5,935 Changed oil and filter,...

162

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

DU5A0006063 Maintenance Sheet for 2010 Toyota Prius Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 8192009 5,090 Changed oil and filter and...

163

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

DP8D3038660 Maintenance Sheet for 2013 Toyota Prius Plug-in Hybrid Advanced Vehicle Testing Activity PHEV Fleet Testing Date Mileage Description Cost 6222013 6,331 5K service -...

164

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

1 Maintenance Sheet for 2013 Toyota Prius Plug-in Hybrid Advanced Vehicle Testing Activity PHEV Fleet Testing Date Mileage Description Cost 6132013 5,220 5K service - under...

165

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

DP6D3038663 Maintenance Sheet for 2013 Toyota Prius Plug-in Hybrid Advanced Vehicle Testing Activity PHEV Fleet Testing Date Mileage Description Cost 6122013 5,078 5K service -...

166

Static Seals Maintenance Guide  

Science Conference Proceedings (OSTI)

This guide provides comprehensive technical information on the understanding and maintenance of static seals. It is designed to help utility staffs maintain static seals and minimize and trouble shoot leakage problems that can reduce plant availability.

1994-09-22T23:59:59.000Z

167

Wind Turbine Maintenance Guide  

Science Conference Proceedings (OSTI)

This guideline provides component-level information regarding the maintenance of major components associated with a wind turbine. It combines recommendations offered by major equipment manufacturers with lessons learned from owner/operators of wind turbine facilities.

2012-06-29T23:59:59.000Z

168

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

8BU100815 Maintenance Sheet for 2011 Chevrolet Volt Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 882012 17,160 Changed oil and filter and...

169

Project 398  

NLE Websites -- All DOE Office Websites (Extended Search)

6 6 Gasification Technologies CONTACTS Gary J. Stiegel Gasification Technology Manager National Energy Technology Laboratory 626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236 412-386-4499 gary.stiegel@netl.doe.gov Ronald Breault Project Manager National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507 304-285-4486 ronald.breault@netl.doe.gov Michael Swanson Principal Investigator University of North Dakota Energy and Environmental Research Center 15 North 23rd Street P.O. Box 9018 Grand Forks, ND 58202 701-777-5239 mswanson@eerc.und.nodak.edu ADVANCED HIGH TEMPERATURE, HIGH-PRESSURE TRANSPORT REACTOR Description Today, coal supplies over 55 percent of the electricity consumed in the United States and will continue to do so well into the next century. One of the technologies being

170

Project 339  

NLE Websites -- All DOE Office Websites (Extended Search)

Combustion Combustion Technologies CONTACTS Robert R. Romanosky Advanced Research Technology Manager National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507 304-285-4721 robert.romanosky@netl.doe.gov Jenny Tennant Project Manager National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507 304-285-4830 jenny.tennant@netl.doe.gov Dr. Tomasz Wiltowski Southern Illinios University Dept. of Mechanical Engineering & Energy Processes Carbondale, IL 62901-4709 618-536-5521 tomek@siu.edu QUALIFICATIONS OF CANDLE FILTERS FOR COMBINED CYCLE COMBUSTION APPLICATIONS Background In order to make oxygen-fired combined cycle combustion feasible, it is necessary to have a reliable high temperature particulate cleanup system. It is well established

171

Project 397  

NLE Websites -- All DOE Office Websites (Extended Search)

6 6 Gasification Technologies CONTACTS Gary J. Stiegel Gasification Technology Manager National Energy Technology Laboratory 626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236 412-386-4499 gary.stiegel@netl.doe.gov John Stipanovich Project Manager National Energy Technology Laboratory 626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236 412-386-6027 john.stipanovich@netl.doe.gov Derek Aldred Principal Investigator Stamet, Inc. 8210 Lankershim Blvd. #9 North Hollywood, CA 91605 818-768-1025 dlaldred@stametinc.com CONTINUOUS PRESSURE INJECTION OF SOLID FUELS INTO ADVANCED COMBUSTION SYSTEM PRESSURES Description Operators and designers of high-pressure combustion systems universally agree that one of the major problems inhibiting the success of this technology relates to solid

172

Power Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Projects Power Projects Contact SN Customers Environmental Review-NEPA Operations & Maintenance Planning & Projects Power Marketing Rates You are here: SN Home page > About SNR Power Projects Central Valley: In California's Central Valley, 18 dams create reservoirs that can store 13 million acre-feet of water. The project's 615 miles of canals irrigate an area 400 miles long and 45 miles wide--almost one third of California. Powerplants at the dams have an installed capacity of 2,099 megawatts and provide enough energy for 650,000 people. Transmission lines total about 865 circuit-miles. Washoe: This project in west-central Nevada and east-central California was designed to improve the regulation of runoff from the Truckee and Carson river systems and to provide supplemental irrigation water and drainage, as well as water for municipal, industrial and fishery use. The project's Stampede Powerplant has a maximum capacity of 4 MW.

173

DOE - Office of Legacy Management -- Dayton Project Units 3 and 4 - OH 07  

NLE Websites -- All DOE Office Websites (Extended Search)

Dayton Project Units 3 and 4 - OH Dayton Project Units 3 and 4 - OH 07 FUSRAP Considered Sites Site: Dayton Project Units 3 & 4 (OH.07 ) U.S. Army Corps of Engineers (FUSRAP) - No Further Action Designated Name: Not Designated Alternate Name: Monsanto Units III and IV Unit III - Board of Education Maintenance Facility Unit IV - Runnymede Playhouse OH.07-1 OH.07-2 OH.07-3 Location: Unit III - 1601 W. First Street Unit IV - Runnymede Road and Dixon Avenue , Dayton , Ohio OH.07-4 OH.07-5 Evaluation Year: 1987 Site Operations: October 1943 to mid-1950 - AEC conducted research and manufactured Polonium by lead dioxide and bismuth processes OH.07-4 Site Disposition: Eliminated - radiation levels below criteria. OH.07-9 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Polonium OH.07-1

174

Equipment Maintenance Optimization Manual Prototypes  

Science Conference Proceedings (OSTI)

This report provides detailed information to assist plant staff in performing recommended equipment maintenance tasks. It is a compilation of equipment maintenance optimization manual (EMOM) prototypes that include procedures and trouble shooting supported by broad-based utility experience. The EMOMs enable utility generation stations to: minimize operation and maintenance costs, including parts and labor; assist in maintenance planning, scheduling, and parts strategy; develop comprehensive maintenance m...

1999-11-24T23:59:59.000Z

175

FMAC: Coal-Handling Maintenance Guide  

Science Conference Proceedings (OSTI)

The Coal Handling System Maintenance Guide provides fossil plant maintenance personnel with current maintenance information on this system. This report will assist plant maintenance personnel in improving the reliability of and reducing the maintenance costs for the coal handling system.

2006-12-22T23:59:59.000Z

176

Maintenance simulation: Software issues  

SciTech Connect

The maintenance of a distributed software system in a production environment involves: (1) maintaining software integrity, (2) maintaining and database integrity, (3) adding new features, and (4) adding new systems. These issues will be discussed in general: what they are and how they are handled. This paper will present our experience with a distributed resource management system that accounts for resources consumed, in real-time, on a network of heterogenous computers. The simulated environments to maintain this system will be presented relate to the four maintenance areas.

Luk, C.H.; Jette, M.A.

1995-07-01T23:59:59.000Z

177

Energy Efficiency and Performance Testing of Non-Road Electric Vehicles: Forklift Truck Evaluation — Status Report  

Science Conference Proceedings (OSTI)

Forklift trucks play an integral role in the industrial economy, and the majority of those trucks in service in the United States are electric. The benefits of such non-road electric vehicles include lower life cycle costs, improved worker health and safety, and reduced maintenance. However, large numbers of electric lift trucks can become a concern to the electric utility industry if the vehicles are inefficient or cause power quality problems. Southern California Edison (SCE) has evaluated the energy e...

2003-12-31T23:59:59.000Z

178

Finance Human Resources & Training Information Systems Director Director Director Technology Officer Operations & Maintenance  

E-Print Network (OSTI)

Maintenance Construction Project Management 982-5048 or esm3e Recycling Annette Cyphers Richard Barbour Safety-5891 or ltw Systems Control Center 982-5876 or pgz5z Health System Research Zone 2 Maintenance 982-4776 or bks Administration Zone 3 Maintenance Mike Merriam Sally Fields Will Schnorr Utility Systems Jeff Moore, P.E. David

Acton, Scott

179

Lawn Maintenance Safety  

E-Print Network (OSTI)

Most homeowners do not consider lawn maintenance to be dangerous. However lawn mowers, trimmers, edgers and other power equipment can cause minor to severe burns and lacerations, broken and dislocated bones, eye injuries and loss of fingers, toes and legs. You can avoid accidents like these by following the safety guidelines in this publication.

Smith, David

2005-07-12T23:59:59.000Z

180

Predictive Maintenance Assessment Guidelines  

Science Conference Proceedings (OSTI)

This document is the third in a series of guidelines designed to help electric power utilities develop programs that take advantage of diagnostic technologies used to detect problems in machinery. The PDM Assessment Guidelines provide the procedures necessary to plan and implement a plant wide predictive maintenance program.

1997-12-02T23:59:59.000Z

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

CH Packaging Maintenance Manual  

SciTech Connect

This procedure provides instructions for performing inner containment vessel (ICV) and outer containment vessel (OCV) maintenance and periodic leakage rate testing on the following packaging seals and corresponding seal surfaces using a nondestructive helium (He) leak test. In addition, this procedure provides instructions for performing ICV and OCV structural pressure tests.

Washington TRU Solutions

2002-01-02T23:59:59.000Z

182

Preventive Maintenance Programs  

Science Conference Proceedings (OSTI)

...and specifications Operator, service, and repair manuals Lubricant type Filter specifications Wear components, especially material survey data Prior service and maintenance reports to identify problem Establish sampling and sample handling procedures Design and document sampling methods, such as in-live...

183

Web Recency Maintenance Protocol  

Science Conference Proceedings (OSTI)

In this paper, we propose a new protocol namely Web Recency Maintenance Protocol (WRMP) that employs "push" mechanism to maintain the currency of the World Wide Web (WWW) at Search Engine (SE) site. As of this writing SEs are adopting "pull" technology, ...

K. Satya Sai Prakash; S. V. Raghavan

2002-12-01T23:59:59.000Z

184

Nuclear Maintenance Applications Center: Heat Exchanger Maintenance Guide  

Science Conference Proceedings (OSTI)

This guide provides plant personnel with information on the operation, maintenance, and performance of heat exchangers. The contents of this guide will assist plant personnel in improving heat exchanger reliability, performance, and maintenance practices.

2009-06-14T23:59:59.000Z

185

USE OF THE DRY MAINTENANCE FACILITY FOR HRT MAINTENANCE  

SciTech Connect

A portable shield was utilized in performing nine semidirect dry maintenance jobs on the HRT. The shield proved to be completely reliable, affording a considerable savings in maintenance costs and reactor downtime. (auth)

Jarvis, J.P.

1962-09-17T23:59:59.000Z

186

Alaskan Ice Road Water Supplies Augmented by Snow Barriers  

NLE Websites -- All DOE Office Websites (Extended Search)

6, 2013 6, 2013 Alaskan Ice Road Water Supplies Augmented by Snow Barriers Washington, D.C. - In a project supported and managed by the Office of Fossil Energy's National Energy Technology Laboratory (NETL), researchers at the University of Alaska Fairbanks have demonstrated that the use of artificial barriers-snow fences-can significantly increase the amount of fresh water supplies in Arctic lakes at a fraction of the cost of bringing in water from nearby lakes. The results promise to enhance environmentally sound development of Alaska's natural resources, lowering the costs of building ice roads used for exploring for oil and natural gas in Alaska. They could also be used to help augment fresh water supplies at remote villages. Researcher Joel Bailey measures the density of the snow in this snow pit to determine the amount of snow in the drift and the water equivalent of the snow drift.

187

Towards a user-centred road safety management method based on road traffic simulation  

Science Conference Proceedings (OSTI)

One of the most important gaps in road safety management practises is the lack of mature methods for estimating reliability. Road safety performance assessment systems have been developed; however, these provide only historical or retrospective analyses. ...

Andreas Gregoriades

2007-12-01T23:59:59.000Z

188

Operations and Maintenance Team | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Team Team Operations and Maintenance Team October 16, 2013 - 5:00pm Addthis Assembling the right set of skills and resources to operate and maintain a renewable energy system is critical. Renewable energy technologies only perform as specified when managed by a well-trained, highly motivated operations and maintenance (O&M) team. For a renewable energy project financed through an energy savings performance contract (ESPC) or a power purchase agreement (PPA), primary O&M services are typically delivered as part of the agreement, but in-house staff will need some familiarity with the system. For agency-funded projects, O&M services may be provided by in-house facilities staff, a contracted service provider, or a combination of the two. Experienced O&M staff can provide valuable input and should be included in

189

Project title:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project title: Roseville Elverta (RSC-ELV) OPGW Replacement Project Project title: Roseville Elverta (RSC-ELV) OPGW Replacement Project Requested By: David Young Mail Code : N1410 Phone: 916-353-4542 Date Submitted: 5/4/2011 Date Required: 5/7/2011 Description of the Project: Purpose and Need The Western Area Power Administration (Western), Sierra Nevada Region (SNR), is responsible for the operation and maintenance (O&M) of federally owned and operated transmission lines, Switchyards, and facilities throughout California. Western and Reclamation must comply with the National Electric Safety Code, Western States Coordinating Council (WECC), and internal directives for protecting human safety, the physical environment, and maintaining the reliable operation of the transmission system. There is an existing OPGW communications fiber on the transmission towers between Roseville and Elverta

190

Computerized Maintenance Management System and Maintenance Work Process Integration  

Science Conference Proceedings (OSTI)

A Computerized Maintenance Management System (CMMS) is an information and communication tool supporting the maintenance work process within an industrial plant. Though these types of systems are found in various industries, no report has existed describing CMMS integration within a utility environment. This guideline describes how to integrate a CMMS with the methods, procedures, work processes, and overall maintenance in a power plant.

1998-04-29T23:59:59.000Z

191

Project Execution Plan Review Module (RM)  

Energy.gov (U.S. Department of Energy (DOE))

The Project Execution Plan (PEP) Review Module (RM) is a tool that assists DOE federal project review teams in evaluating the adequacy of the PEP development and maintenance for projects of any...

192

Reactive Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reactive Maintenance Reactive Maintenance Reactive Maintenance October 7, 2013 - 9:40am Addthis Reactive maintenance follows a run-it-until-it-breaks strategy where no actions or efforts are taken to maintain equipment as intended by the manufacturer. Studies indicate this is still the predominant mode of maintenance for Federal facilities. Advantages Reactive maintenance advantages are a double-edged sword. Federal agencies following a purely reactive maintenance strategy can expect little expenditures for manpower or system upkeep until something breaks. However, systems do break. With new equipment, Federal agencies can expect minimal incidents of failure. However, older equipment often experiences higher failure incidents and costlier repairs. Other advantages of reactive maintenance are:

193

Preventive Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Preventive Maintenance Preventive Maintenance Preventive Maintenance October 7, 2013 - 9:44am Addthis Preventive maintenance aims to sustain or extend system lifespan through a set of actions that detect, preclude, or mitigate system degradation. These actions are based on either calendar time or machine run time. Advantages Federal agencies can greatly extend equipment reliability and lifespan by expending the necessary resources for regular maintenance. In most cases, the system designer or manufacturer outlines regular maintenance under a preventive strategy. In addition to increased reliability and lifespan, budget is saved over the life of the system. Preventive maintenance programs can save as much as 12% to 18% in equipment repair and replacement. Other advantages of preventitive maintenance are:

194

Maintenance FUSION IGNITION RESEARCH EXPERIMENT  

E-Print Network (OSTI)

to refine the system details, interfaces and the requirements for remote handling. Table 1. FIRE RadialInsulation Enclosure Remote Maintenance Module FUSION IGNITION RESEARCH EXPERIMENT SYSTEM objectives and subsystem requirements in an arrangement that allows remote maintenance of in

195

HVAC Maintenance and Technologies  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HVAC - HVAC - Maintenance and Technologies Federal Utility Partnership Working Group Meeting Providence, Rhode Island April 15, 2010 BY Ramin Faramarzi, P.E. Technology Test Centers (TTC) Design and Engineering Services Southern California Edison (SCE) www.sce.com/rttc 2 Outline * Introduction to SCE's TTC * Overview of energy challenges in California (CA) * Role of HVAC in CA's energy and demand equations * Factors affecting HVAC performance * Focus on SCE's research on maintenance faults * Next generation of HVAC equipment * HVAC technologies on SCE's TTC radar * Black boxes - do they all work? 3 SCE's Technology Test Centers * SCE applied research facilities located in Irwindale, CA comprised of 3 test beds: * Refrigeration * HVAC * Lighting * Coming Soon! - A new ZNE lab 4 Refrigeration Testing

196

care and maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Care and Maintenance of the Prairie Parcel Care and Maintenance of the Prairie Parcel Now that your prairie parcel is up and growing, there are just a few concerns that you should consider about its care. Weeding The question of weeding is really just a matter of aesthetics. You do not have to weed your parcel. If your parcel is a large one, weeding may not even be practical. Although the "weed" species will dominate your parcel for the first few years, they will give way to the native plant species. You can liken the native plants to long distance runners; they appear to start off slowly, but end up winning the ecological race. After all, they are the plants that are genetically-suited and adapted to growing in this environment. The native prairie plants will be developing extensive root structure the

197

Terminal automation system maintenance  

SciTech Connect

Nothing has improved petroleum product loading in recent years more than terminal automation systems. The presence of terminal automation systems (TAS) at loading racks has increased operational efficiency and safety and enhanced their accounting and management capabilities. However, like all finite systems, they occasionally malfunction or fail. Proper servicing and maintenance can minimize this. And in the unlikely event a TAS breakdown does occur, prompt and effective troubleshooting can reduce its impact on terminal productivity. To accommodate around-the-clock loading at racks, increasingly unattended by terminal personnel, TAS maintenance, servicing and troubleshooting has become increasingly demanding. It has also become increasingly important. After 15 years of trial and error at petroleum and petrochemical storage and transfer terminals, a number of successful troubleshooting programs have been developed. These include 24-hour {open_quotes}help hotlines,{close_quotes} internal (terminal company) and external (supplier) support staff, and {open_quotes}layered{close_quotes} support. These programs are described.

Coffelt, D.; Hewitt, J. [Engineered Systems Inc., Tempe, AZ (United States)

1997-01-01T23:59:59.000Z

198

Main Generator Rotor Maintenance  

Science Conference Proceedings (OSTI)

Main generator rotors are constructed and designed to provide decades of reliable and trouble-free operation. However, a number of incidences have occurred over the years that can adversely impact reliable operation of generator rotors and, ultimately, production of electrical power. This report is a guide for power plant personnel responsible for reliable operation and maintenance of main generators. As a guide, this report provides knowledge and experience from generator experts working at power plants...

2006-11-27T23:59:59.000Z

199

Electric Motor Tiered Maintenance Program  

Science Conference Proceedings (OSTI)

Electric motor predictive and preventive maintenance guidance has been developed to provide information to help maximize motor reliability and to minimize the need for major motor repairs. However, if all recommendations presented in most guides are followed and applied to all motors, the cost of motor maintenance would be unwieldy and consume more than its share of maintenance budgets.

2002-08-27T23:59:59.000Z

200

Bottom Ash System Maintenance Guide  

Science Conference Proceedings (OSTI)

This guide provides information to personnel involved in the bottom ash system and its components, including good maintenance practices, condition monitoring, predictive and preventive maintenance techniques, probable failure modes, and troubleshooting guidance. The guide was developed primarily to provide detailed maintenance and troubleshooting information but also includes basic system information.

2000-10-31T23:59:59.000Z

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Predictive Maintenance Program Implementation Experience  

Science Conference Proceedings (OSTI)

Predictive maintenance (PDM) is a process of collecting data, assessing machinery condition, and deciding when to perform maintenance. PDM saves money and improves machinery reliability as compared to preventive or corrective maintenance. This report describes the implementation of PDM programs at Commonwealth Edison's (ComEd's) fossil power plants.

1998-12-29T23:59:59.000Z

202

Compressed Air System Maintenance Guide  

Science Conference Proceedings (OSTI)

The "Compressed Air System Maintenance Guide" provides fossil plant personnel with information on the operation and maintenance of the compressed air system. The contents of this guide will assist personnel in improving performance of the compressed air system, reducing maintenance costs, and increasing air system reliability.

2002-11-27T23:59:59.000Z

203

Design of a maintenance and operations recommender  

E-Print Network (OSTI)

from computerized maintenance management systems (CMMS)use computerized maintenance management systems (CMMS) andmanagement and control systems (EMCS) to recom- mend what maintenance

Federspiel, C.; Villafana, L.

2003-01-01T23:59:59.000Z

204

HVAC Maintenance and Technologies | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HVAC Maintenance and Technologies HVAC Maintenance and Technologies Presentation covers the HVAC maintenance and technologies, and is given at the Spring 2010 Federal Utility...

205

U.S. DEPARTMENT OFllNERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OFllNERGY OFllNERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION RECIPIENT:Washington Department of Commerce Page 1 of2 STATE: WA PROJECT TITLE: Kittitas County, Washington Morris Sorensen Bldg. & Upper County Shop· EECBG State of Washington Funding Opportunity Announcement Number Procuremenllnslrument Number DE-EE0000849 NEPA Control Number em Number EEO Based on my review orlhe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A),1 have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 81.3 Routine maintenance activities and custodial services for buildings, structures, rights-of-way, infrastructures (e.g ., pathways. roads, and railroads ). vehicles and equipment. and localized vegetation and pest control. during which

206

NETL: Oil & Natural Gas Projects: Alaska North Slope Oil and Gas  

NLE Websites -- All DOE Office Websites (Extended Search)

Alaska North Slope Oil and Gas Transportation Support System Last Reviewed 12/23/2013 Alaska North Slope Oil and Gas Transportation Support System Last Reviewed 12/23/2013 DE-FE0001240 Goal The primary objectives of this project are to develop analysis and management tools related to Arctic transportation networks (e.g., ice and snow road networks) that are critical to North Slope, Alaska oil and gas development. Performers Geo-Watersheds Scientific, Fairbanks, AK 99708 University of Alaska Fairbanks, Fairbanks, AK 99775 Idaho National Laboratory, Idaho Falls, ID 83415 Background Oil and gas development on the North Slope is critical for maintaining U.S. energy supplies and is facing a period of new growth to meet the increasing energy needs of the nation. A majority of all exploration and development activities, pipeline maintenance, and other field support projects take

207

On-Road Emissions in Asia Measured by Remote Sensing.  

E-Print Network (OSTI)

On-Road Emissions in Asia Measured by Remote Sensing. · Donald H. Stedman, Gary A. Bishop on-road advantage · Large on-road emissions cause poor air quality. · Remote sensing measures on

Denver, University of

208

Road traffic congestion in the developing world  

Science Conference Proceedings (OSTI)

Road traffic jams continue to remain a major problem in most cities around the world, especially in developing regions resulting in massive delays, increased fuel wastage and monetary losses. Due to the poorly planned road networks, a common outcome ... Keywords: congestion collapse, simulation, traffic congestion, traffic detection

Vipin Jain; Ashlesh Sharma; Lakshminarayanan Subramanian

2012-03-01T23:59:59.000Z

209

Road Surface Condition Forecasting in France  

Science Conference Proceedings (OSTI)

A numerical model designed to simulate the evolution of a snow layer on a road surface was forced by meteorological forecasts so as to assess its potential for use within an operational suite for road management in winter. The suite is intended ...

L. Bouilloud; E. Martin; F. Habets; A. Boone; P. Le Moigne; J. Livet; M. Marchetti; A. Foidart; L. Franchistéguy; S. Morel; J. Noilhan; P. Pettré

2009-12-01T23:59:59.000Z

210

Road Transportable Analytical Laboratory system. Phase 1  

SciTech Connect

This developmental effort clearly shows that a Road Transportable Analytical Laboratory System is a worthwhile and achievable goal. The RTAL is designed to fully analyze (radioanalytes, and organic and inorganic chemical analytes) 20 samples per day at the highest levels of quality assurance and quality control. It dramatically reduces the turnaround time for environmental sample analysis from 45 days (at a central commercial laboratory) to 1 day. At the same time each RTAL system will save the DOE over $12 million per year in sample analysis costs compared to the costs at a central commercial laboratory. If RTAL systems were used at the eight largest DOE facilities (at Hanford, Savannah River, Fernald, Oak Ridge, Idaho, Rocky Flats, Los Alamos, and the Nevada Test Site), the annual savings would be $96,589,000. The DOE`s internal study of sample analysis needs projects 130,000 environmental samples requiring analysis in FY 1994, clearly supporting the need for the RTAL system. The cost and time savings achievable with the RTAL system will accelerate and improve the efficiency of cleanup and remediation operations throughout the DOE complex.

Finger, S.M.; Keith, V.F.; Spertzel, R.O.; De Avila, J.C.; O`Donnell, M.; Vann, R.L.

1993-09-01T23:59:59.000Z

211

HFIR Plant Maintenance - August  

NLE Websites -- All DOE Office Websites (Extended Search)

that tracks the many properties of each Transportation Security Project (TSP) asset was recently deployed as part of the International Material Protection and Cooperation...

212

Murdock Road Knoxville.TN  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

702 702 Murdock Road Knoxville.TN 37932 Tel: (609) 921-1456 Fax: (609) 92 1-8703 AA\W.nell-one.com March 25,2009 Office of the Assistant General Counsel for Technology Transfer and Intellectual Property U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585 Attn: Technology Transfer Questions Subject: Questions Concerning Technology Transfer Practices at DOE Laboratories (Federal RegisterNol. 73, No. 229/ November 26,2008 /Notices) Dear Mr. Gottlieb, Thank you for the opportunity to respond to the questions published in the Federal Register. As Chief Executive Officer of Nell One Therapeutics, a spin-out company which is in the process of licensing technology from Oak Ridge National Laboratory (ORNL), I found the questions to be highly relevant to our experiences. While many great technologies and capabilities reside in the National Laboratories

213

HEV Fleet Testing Maintenance Sheet  

NLE Websites -- All DOE Office Websites (Extended Search)

Description Cost 272002 8,668 Oil change 50.17 522002 12,898 Driver ran over debris on road causing foreign object damage to front coolers. Coolers replaced. (not...

214

Opportune maintenance and predictive maintenance decision support douard Thomas, ric Levrat, Benoit Iung, Pierre Cocheteux  

E-Print Network (OSTI)

to several ones. Keywords: Predictive maintenance, Maintenance engineering, Decision making, Complex systems be answered by using maintenance engineering, and more specifically a computerised maintenance management system that collects the information related to the different maintenance actions. Finally the second

Paris-Sud XI, Université de

215

Federal Energy Management Program: Maintenance Types  

NLE Websites -- All DOE Office Websites (Extended Search)

Maintenance Types Maintenance Types to someone by E-mail Share Federal Energy Management Program: Maintenance Types on Facebook Tweet about Federal Energy Management Program: Maintenance Types on Twitter Bookmark Federal Energy Management Program: Maintenance Types on Google Bookmark Federal Energy Management Program: Maintenance Types on Delicious Rank Federal Energy Management Program: Maintenance Types on Digg Find More places to share Federal Energy Management Program: Maintenance Types on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Reactive Preventive Predictive Reliability-Centered Major Equipment Types Resources Contacts

216

Software maintenance maturity model (smmm): the software maintenance process model  

E-Print Network (OSTI)

This paper summarizes the research work leading to a Phd thesis that addresses the assessment and improvement of the software maintenance function by proposing a maturity model for daily software maintenance activities: Software Maintenance Maturity Model (SM mm) as well as its supporting knowledge based system SM Xpert. The software maintenance function suffers from a scarcity of management models to facilitate its evaluation, management, and continuous improvement. The SM mm addresses the unique activities of software maintenance while preserving a structure similar to that of the CMMi ©1 maturity model. It is designed to be used as a complement to this model. The SM mm is based on practitioners ’ experience, international standards, and the seminal literature on software maintenance. This paper presents the model’s purpose, scope, foundation, and architecture, followed by a knowledgebased system to help software maintainers learn and use the maturity model. 1.

Alain April; Jean-marc Desharnais

2005-01-01T23:59:59.000Z

217

Nuclear Maintenance Applications Center: Isolated Phase Bus Maintenance Guide  

Science Conference Proceedings (OSTI)

This report provides information on design, operating experience, and maintenance practices associated with the isophase bus system. The information is meant to be useful for system engineers, component engineers, maintenance personnel, and their supervision in understanding and maintaining this system. This document is an update to Isolated Phase Bus Maintenance Guide (EPRI report TR-112784), and the scope has been expanded to include boundary components, such as potential transformers (PTs) and current...

2007-12-20T23:59:59.000Z

218

Generation Maintenance Applications Center: Conventional Vertical Pump Maintenance Guide  

Science Conference Proceedings (OSTI)

Vertical pumps are used in several applications in power plants, such as condensate, heater drain, circulating water, and service water/river water applications.BackgroundThe Maintenance Issue Surveys of the Electric Power Research Institute (EPRI) Generation Maintenance Applications Center (GenMAC) indicate that members are experiencing difficulties with various maintenance issues associated with vertical pumps. Some of the problems identified a need for ...

2013-12-19T23:59:59.000Z

219

Forest Road Building Regulations | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here You are here Home » Forest Road Building Regulations Forest Road Building Regulations < Back Eligibility Utility Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Schools Retail Supplier Institutional Fuel Distributor Nonprofit Transportation Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info Start Date 09/2010 State Wisconsin Program Type Environmental Regulations The Wisconsin Department of Natural Resources has regulations for building a forest road, if development requires one. Regulations include zoning ordinances and permits for stream crossing, grading, stormwater, and

220

Fly Ash Construction Manual for Road and Site Applications, Volumes 1 and 2  

Science Conference Proceedings (OSTI)

This two-volume construction manual details the use of fly ash in high-volume road construction and site development, covering all project elements from ash procurement to finishing. It addresses the use of fly ash in fills, embankments, backfills, subgrade stabilization, pavement base course, and slurried backfills, as well as its application as a soil amendment.

1988-10-28T23:59:59.000Z

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

USVI Energy Road Map: Charting the Course to a Clean Energy Future (Brochure)  

Science Conference Proceedings (OSTI)

This brochure provides an overview of the integrated clean energy deployment process and progress of the Energy Development in Island Nations U.S. Virgin Islands pilot project road map, including over-arching goals, organization, strategy, technology-specific goals and accomplishments, challenges, solutions, and upcoming milestones.

Not Available

2011-07-01T23:59:59.000Z

222

Management Applications of Maintenance Reports  

E-Print Network (OSTI)

The good computerized maintenance management systems available today provide Plant Engineers with sufficient data to institute policies and procedures to materially affect the company profits. Regrettably, the vast majority of these Engineers and their Maintenance Managers seem content to simply produce PM work orders, maintenance equipment repair histories and generate a few activity reports. A straightforward and practical application of the available cost and performance data enables maintenance management to constantly fine tune operational procedures to minimize cost and equipment failure from the available data. Using this data, the manager can easily measure the total effect of maintenance on his company's overall performance. The practical application of this data to reduce overall maintenance cost and to increase equipment availability is discussed in this paper.

Gehl, P.

1993-03-01T23:59:59.000Z

223

Machine Maintenance Integrated Performance Support System  

SciTech Connect

The objectives of this partnership project were to develop a preventive maintenance checklist program, a troubleshooting system for the Vertical Turning Center (VTC)-5, an on-line manual, and to integrate these components with a custom browser that would run on the VTC-5 machine's controller and would support future internet/intranet delivery. Kingsbury provided subject matter experts from engineering, manufacturing, and technical support. They also provided photographs, schematics, and CAD drawings, which AlliedSignal Federal Manufacturing and Technologies (ASFM and T) digitized for use in the final program. Information from The Kingsbury troubleshooting experts were interviewed regarding symptoms and root causes of system malfunctions This knowledge was captured and from it, fault trees were developed. These trees were then incorporated into the EPSS as a troubleshooting tool. The troubleshooting portion of the system presents simple questions to the machine operator in order to determine the likely cause or causes of malfunctions and then recommends systematic corrective actions. The on-line reference manual, covering operations and maintenance, provides text and illustrations to the machine operator in a traditional structure, but additionally offers the capability to search voluminous amounts of technical data and retrieve specific information on request. The maintenance portion of the EPSS includes checklists that are displayed daily, weekly, monthly, and annually, as appropriate, on the VTC-5 controller screen. The controller software is unavailable for machining parts until the machine tool operator goes through and checks off all of the checklist items. This project provided the team with a detailed understanding of the knowledge and information required to produce and support advanced machine tools. In addition, it resulted in the design and construction of a prototype VTC-5 EPSS containing all the logic and interfaces necessary to integrate operations and maintenance information from other Kingsbury machine tools.

Bohley, M.C.; Schwartz, M.E.

1998-03-11T23:59:59.000Z

224

Equipment Maintenance Optimization Manual Applications  

Science Conference Proceedings (OSTI)

This report is a compilation of Equipment Maintenance Optimization Manuals (EMOMs) that include procedures and troubleshooting supported by broad-based utility experience. EMOMs for critical generating station equipment allows power generating plants to replace existing maintenance practices with the latest industry best practices. Using this information as a benchmark, current practices can be validated or adjusted for more optimum performance of the overall maintenance process. In addition, the EMOMs c...

2001-12-21T23:59:59.000Z

225

Reliability-Centered Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reliability-Centered Maintenance Reliability-Centered Maintenance Reliability-Centered Maintenance October 7, 2013 - 9:48am Addthis Reliability-centered maintenance leverages the same practices and technologies of predictive maintenance. The difference is that reliability-centered maintenance recognizes that: Equipment design and operations differ Different equipment has different probabilities of failure All equipment is not of equal importance to facility operations Facilities have limited financial and personnel resources. While reliability-centered maintenance relies on predictive maintenance practices and technologies, it also recognizes that maintenance on inexpensive and/or unimportant equipment may be better served by a reactive or predictive maintenance approach. Each of the aforementioned factors are

226

Federal Energy Management Program: Reactive Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Reactive Reactive Maintenance to someone by E-mail Share Federal Energy Management Program: Reactive Maintenance on Facebook Tweet about Federal Energy Management Program: Reactive Maintenance on Twitter Bookmark Federal Energy Management Program: Reactive Maintenance on Google Bookmark Federal Energy Management Program: Reactive Maintenance on Delicious Rank Federal Energy Management Program: Reactive Maintenance on Digg Find More places to share Federal Energy Management Program: Reactive Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Reactive Preventive Predictive Reliability-Centered Major Equipment Types

227

Federal Energy Management Program: Operations and Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations and Operations and Maintenance to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance on Google Bookmark Federal Energy Management Program: Operations and Maintenance on Delicious Rank Federal Energy Management Program: Operations and Maintenance on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Major Equipment Types Resources

228

Federal Energy Management Program: Preventive Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Preventive Preventive Maintenance to someone by E-mail Share Federal Energy Management Program: Preventive Maintenance on Facebook Tweet about Federal Energy Management Program: Preventive Maintenance on Twitter Bookmark Federal Energy Management Program: Preventive Maintenance on Google Bookmark Federal Energy Management Program: Preventive Maintenance on Delicious Rank Federal Energy Management Program: Preventive Maintenance on Digg Find More places to share Federal Energy Management Program: Preventive Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Reactive Preventive Predictive Reliability-Centered Major Equipment Types

229

Sustainability of green space maintenance  

E-Print Network (OSTI)

In Japan, recent changes in socio-economic and political structures -- decreasing tax revenue, declining communication among community members, and privatization of public services-- have influenced existing maintenance ...

Nomura, Wataru

2011-01-01T23:59:59.000Z

230

Generation Maintenance Application Center: Combined Cycle Combustion Turbine Attemperator Maintenance Guide  

Science Conference Proceedings (OSTI)

Combustion turbine combined-cycle (CTCC) facilities use various components that are unique to these types of power-generation plants. Therefore, use of the Electric Power Research Institute (EPRI) Preventive Maintenance Basis Database (1018758) by owners of CTCC facilities is limited to only those components that are common to both types of power plants and that have been previously added to the database. Because of the projected growth in the number of CTCC facilities, the EPRI Generation ...

2012-12-31T23:59:59.000Z

231

Generation Maintenance Application Center: Combustion Turbine Combined-Cycle Steam Valves Maintenance Guide  

Science Conference Proceedings (OSTI)

 BackgroundCombustion turbine combined-cycle (CTCC) facilities use various components that are unique to these types of power generation plants. Therefore, use of the Electric Power Research Institute (EPRI) Preventive Maintenance Basis Database (1018758) by owners of CTCC facilities is somewhat limited to only those components that are common to both CTCC facilities and nuclear or fossil power plants. With the projected growth in the number of CTCC facilities, the ...

2013-05-14T23:59:59.000Z

232

Generation Maintenance Application Center: Combined Cycle Combustion Turbine Continuous Emissions Monitoring Maintenance Guide  

Science Conference Proceedings (OSTI)

Combustion turbine combined cycle (CTCC) facilities utilize various components that are unique to these types of power-generation plants and that are not typically found in a nuclear or fossil-power plant.  As such, use of the EPRI PM Basis Database (PMDB) by current owners of CTCC facilities is limited to only those components that are common to both types of power plants and already in the database.  With the projected growth in the number of CTCC facilities, EPRI General Maintenance ...

2012-12-31T23:59:59.000Z

233

Mechanical Operations and Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Holiday Work Status Holiday Work Status Mechanical Operations & Maintenance Group APS Storage Ring Magnets The Advanced Photon Source (APS) at the Argonne National Laboratory is a national synchrotron-radiation research facility funded by the U.S. Department of Energy. Using high-brilliance x-ray beams from the APS, an international community of scientists conducts forefront basic and applied research in the fields of material science, biological science, physics, chemistry, environmental, geophysical and planetary science. The 1.1-km circumference APS facility consists of several major subsystems including magnets, vacuum chambers, radio-frequency cavities, diagnostics instrumentation, x-ray absorbers and apertures, and cooling water subsystems. Each of these subsystems contains hundreds of mechanical

234

On-road remote sensing of vehicle emissions in  

E-Print Network (OSTI)

On-road remote sensing of vehicle emissions in the Auckland Region August 2003 Technical 1877353000 www.arc.govt.nz #12;TP 198 On-Road Remote Sensing of Vehicle Emissions in the Auckland Region #12;Page i TP 198 On-Road Remote Sensing of Vehicle Emissions in the Auckland Region On-road remote sensing

Denver, University of

235

Rattlesnake Road Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Rattlesnake Road Wind Farm Rattlesnake Road Wind Farm Jump to: navigation, search Name Rattlesnake Road Wind Farm Facility Rattlesnake Road Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Horizon Developer Horizon Energy Purchaser Constellation Energy/PG&E Location Gilliam County west of Arlington OR Coordinates 45.700461°, -120.280581° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.700461,"lon":-120.280581,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

236

Overview of the ROADS'09 workshop  

Science Conference Proceedings (OSTI)

This report presents a brief overview of the organization and the program of the fourth Real Overlays and Distributed Systems Workshop ROADS'09 co-located with the 22nd SOSP conference at Big Sky, Montana.

Walid Dabbous; Maximilian Ott

2010-01-01T23:59:59.000Z

237

HCEI Road Map: 2011 Edition (Brochure)  

SciTech Connect

This road map outlines the 2011 key goals and strategies of the Hawaii Clean Energy Initiative, was founded based on a Memorandum of Understanding between the State of Hawaii and the U.S. Department of Energy in 2008.

Braccio, R.; Finch, P.

2011-08-01T23:59:59.000Z

238

HCEI Road Map: 2011 Edition (Brochure)  

Energy.gov (U.S. Department of Energy (DOE))

This road map outlines the 2011 key goals and strategies of the Hawaii Clean Energy Initiative, was founded based on a Memorandum of Understanding between the State of Hawaii and the U.S. Department of Energy in 2008.

239

The Silk Road Leads to the APS  

NLE Websites -- All DOE Office Websites (Extended Search)

The silk road leads to the APS Lori Khatchadourian (University of Michigan) and Adam Smith (The University of Chicago) switch sample mounts at the ChemMatCARS 15-ID-D beamline. The...

240

Nuclear Maintenance Applications Center: Reactor Recirculation Pump Seal Maintenance Guide  

Science Conference Proceedings (OSTI)

In 1993, the Electric Power Research Institute (EPRI) published Main Coolant Pump Seal Maintenance Guide (report TR-100855). That report provides guidance on maintenance and troubleshooting of main coolant pump seals but was generic in naturethe information was relevant to pressurized water reactors (PWRs) and boiling water reactors (BWRs).

2008-12-18T23:59:59.000Z

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Nuclear Maintenance Applications Center: Emergency Diesel Generator Condition- Based Maintenance  

Science Conference Proceedings (OSTI)

Condition-based maintenance practices that were developed in the United States in the 1990s for emergency diesel generators (EDGs) have not been fully adopted by international nuclear plant operators. To encourage broader use of such practices, NMAC formed a technical advisory group of international utilities interested in learning more about condition-based EDG maintenance practices.

2008-12-19T23:59:59.000Z

242

Microsoft Word - CX-RiceFlatsSiteMaintenanceFY12_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12, 2012 12, 2012 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Steve Lowder Project Manager - TESM-AMPN-2 Proposed Action: Rice Flats Electrode Site Maintenance and Inspection Project Budget Information: Work Order #00219387 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities Location: The proposed project area is approximately seven miles southeast of The Dalles,

243

Microsoft Word - CX-AccessRoads-KingCoWA-FY13_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

22, 2013 22, 2013 REPLY TO ATTN OF: KEPR-Covington SUBJECT: Environmental Clearance Memorandum Rick Ross Engineer - TELF-TPP-3 Proposed Action: Covington District Culvert Replacements Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): Appendix B1.3, Routine Maintenance Location: King County, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to replace existing culverts at 12 access road stream crossings that present barriers to fish passage. These improvements will be made on BPA easement access roads within DNR owned and managed lands. BPA will make these improvements by installing new fish friendly culverts and/or bridges at each stream crossing. The current stream crossings do not meet DNR fish passage standards that will be in

244

EA-1941: Boyer-Tillamook Access Road Improvement Project, Tillamook...  

NLE Websites -- All DOE Office Websites (Extended Search)

walls. In addition, new bridges would be built, and culverts that currently block fish passage for anadromous and resident fish would be replaced. Additional information is...

245

Safety, Capacity, Maintenance, and Major Repair  

Science Conference Proceedings (OSTI)

... Continue repairing or replacing aging utility systems, exhaust and air ... Continue improvements to site infrastructure, including roads, loading docks ...

2010-10-05T23:59:59.000Z

246

HFIR Plant Maintenance - August  

NLE Websites -- All DOE Office Websites (Extended Search)

July 2012 July 2012 2 Managed by UT-Battelle for the U.S. Department of Energy ORNL Isotope Infrastructure DataTransferKit Public release of CASL infra- structure software TriBITS Three key components of the VERA (Virtual Environment for Reactor Applications) infrastructure have been released and made publicly-available. Lightweight Integrating Multiphysics Environment (LIME) * The Tribal Build, Integrate, and Test System is built on the open-source Kitware CMake, CTest, CDash tools and provides a solution for very large scale projects, especially meta- projects resulting from the integration of many different (but interrelated) projects. * Available at: http://code.google.com/p/tribits/ * DataTransferKit (DTK) is being developed to implement the rendezvous algorithm and the

247

DSW Power Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Projects Contact DSW Customers Customer Meetings Environmental Review-NEPA Operations & Maintenance Planning & Projects Power Marketing Power Projects Contact DSW Customers Customer Meetings Environmental Review-NEPA Operations & Maintenance Planning & Projects Power Marketing Rates DSW Power Projects Boulder Canyon: Straddling the Colorado River near the Arizona-Nevada border, Hoover Dam in Boulder Canyon creates Lake Mead. River waters turning turbines at Hoover Powerplant produce about 2,074 MW--enough electricity for nearly 8 million people. Western markets this power to public utilities in Arizona, California and Nevada over 53.30 circuit-miles of transmission line. Central Arizona: Authorized in 1968, the Central Arizona Project in Arizona and western New Mexico was built to improve water resources in the Colorado River Basin. Segments of the authorization allowed for Federal participation in the Navajo Generating Station. The Federal share of the powerplant's combined capacity is 547 MW.

248

Training on PV Systems: Design, Construction, Operation and Maintenance |  

Open Energy Info (EERE)

Training on PV Systems: Design, Construction, Operation and Maintenance Training on PV Systems: Design, Construction, Operation and Maintenance Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Training on PV Systems: Design, Construction, Operation and Maintenance Agency/Company /Organization: Leonardo Energy Sector: Energy Focus Area: Renewable Energy, Solar Website: www.leonardo-energy.org/node/5948 Training on PV Systems: Design, Construction, Operation and Maintenance Screenshot References: PV Training [1] Overview "A free series of six webinars will be delivered to provide the required knowledge to design a high performance photovoltaic (PV) installation, entering into economic evaluation and project cash-flow. Additionally, very practical aspects such as the construction, start-up, quality management and testing will be reviewed. Plant operation is described in detail, with

249

Achieving world class maintenance status  

Science Conference Proceedings (OSTI)

The article written by a management consultant, discusses the art of successful planning and operation of maintenance in mines considering factors such as benchmaking, key performance indices (KPIs) and frequency of procedures which can help achieve 'world class maintenance'. 1 fig.

Tomlingson, P.D. [Paul D. Tomingson Associates (United States)

2007-08-15T23:59:59.000Z

250

OpenEI Community - Maintenance  

Open Energy Info (EERE)

maintenance maintenance March 8-9, 2013 http://en.openei.org/community/blog/openei-maintenance-march-8-9-2013  We would like to inform the OpenEI community that OpenEI will be undergoing a significant software upgrade during a maintenance window this weekend.  We will be upgrading the wiki and semantic mediawiki portions of OpenEI, which means /datasets, /apps, /lod, /sparql and /community will continue to function normally.  Additionally, web services that rely on Ask queries (utility rate database API) may have some downtime as we transition.maintenance-march-8-9-2013" target="_blank">read more

251

Project 320  

NLE Websites -- All DOE Office Websites (Extended Search)

Philip Goldberg Philip Goldberg Project Manager National Energy Technology Laboratory 626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236 412-386-5806 philip.goldberg@netl.doe.gov Marek Wojtowicz Advanced Fuel Research, Inc. 87 Church Street East Hartford, CT 06108 860-528-9806 marek@AFRinc.com Sequestration CARBON DIOXIDE RECOVERY FROM COMBUSTION FLUE GAS USING CARBON- SUPPORTED AMINE SORBENTS Background In Phase I, Advanced Fuel Research, Inc. will initiate development of a novel sorbent for the removal of carbon dioxide from combustion/incineration flue gas. The sorbent, based on amines supported on low-cost activated carbon, will be produced from scrap tires. Liquid-based amine systems are limited to relatively low concentrations to avoid corrosion. Corrosion should not be a

252

Project 199  

NLE Websites -- All DOE Office Websites (Extended Search)

Heino Beckert Heino Beckert Project Manager National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507 304-285-4132 heino.beckert@netl.doe.gov Ramin Yazdani Senior Civil Engineer Yolo County Planning and Public Works Department 292 West Beamer Street Woodland, CA 95695 530-666-8848 ryazdani@yolocounty.org Sequestration Yolo County Landfill Methane Production Compared to Other Landfills FULL-SCALE BIOREACTOR LANDFILL Background Sanitary landfilling is the dominant method of solid waste disposal in the United States, accounting for the disposal of about 217 million tons of waste annually (U.S. EPA, 1997). The annual production of municipal waste in the United States has more than doubled since 1960. In spite of increasing rates of reuse and recycling, population and

253

Project311  

NLE Websites -- All DOE Office Websites (Extended Search)

Lang Lang Project Manager National Energy Technology Laboratory 626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236 412-386-4881 david.lang@netl.doe.gov John Bowser Principal Investigator Compact Membrane Systems, Inc. 325 Water Street Wilmington, DE 19804 302-999-7996 john.bowser@compactmembrane.com Sequestration CARBON DIOXIDE CAPTURE FROM LARGE POINT SOURCES Background Capture of carbon dioxide at the source of its emission has been a major focus in greenhouse gas emission control. Current technologies used for capturing CO 2 suffer from inefficient mass transfer and economics. In Phase I, Compact Membrane Systems, Inc. will fabricate and test a membrane-based absorption system for the removal of carbon dioxide from a simulated power-plant flue gas. The stability of the membrane system under various operating conditions

254

Project 333  

NLE Websites -- All DOE Office Websites (Extended Search)

José D. Figueroa José D. Figueroa Project Manager National Energy Technology Laboratory 626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236 412-386-4966 jose.figueroa@netl.doe.gov C. Jeffrey Brinker Sandia Fellow, Sandia National Laboratories Professor of Chemical & Nuclear Engineering The University of New Mexico Advanced Materials Laboratory 1001 University Blvd. SE, Suite 100 Albuquerque, NM 87106 505-272-7627 cjbrink@sandia.gov Sequestration NOVEL DUAL FUNCTIONAL MEMBRANE FOR CONTROLLING CARBON DIOXIDE EMISSIONS FROM FOSSIL FUELED POWER PLANTS Background There is growing concern among climate scientists that the buildup of greenhouse gases (GHG), particularly carbon dioxide, in the atmosphere is affecting the global climate in ways that could have serious consequences. One approach to reducing GHG emissions

255

Project 346  

NLE Websites -- All DOE Office Websites (Extended Search)

Sara Pletcher Sara Pletcher Project Manager National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507 304-385-4236 sara.pletcher@netl.doe.gov Gary M. Blythe URS Corporation PO Box 201088 Austin, TX 78720 512-419-5321 gary_blythe@urscorp.com BENCH SCALE KINETICS OF MERCURY REACTIONS IN FGD LIQUORS Background When research into the measurement and control of Hg emissions from coal-fired power plants began in earnest in the early 1990s, it was observed that oxidized mercury can be scrubbed at high efficiency in wet FGD systems, while elemental mercury cannot. In many cases, elemental mercury concentrations were observed to increase slightly across wet FGD systems, but this was typically regarded as within the variability of the measurement methods. However, later measurements have

256

Project 278  

NLE Websites -- All DOE Office Websites (Extended Search)

Karen Cohen Karen Cohen Project Manager National Energy Technology Laboratory 626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236 412-386-6667 karen.cohen@netl.doe.gov Ken Nemeth Executive Director Southern States Energy Board 6325 Amherst Court Norcross, GA 30092 770-242-7712 nemeth@sseb.org Sequestration SOUTHEAST REGIONAL CARBON SEQUESTRATION PARTNERSHIP (SECARB) Background The U.S. Department of Energy has selected the seven partnerships of state agencies, universities, and private companies that will form the core of a nationwide network that will help determine the best approaches for capturing and permanently storing gases that can contribute to global climate change. All together, the partnerships include more than 240 organizations, spanning 40 states, three Indian nations, and

257

Federal Energy Management Program: Predictive Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

to someone by E-mail to someone by E-mail Share Federal Energy Management Program: Predictive Maintenance on Facebook Tweet about Federal Energy Management Program: Predictive Maintenance on Twitter Bookmark Federal Energy Management Program: Predictive Maintenance on Google Bookmark Federal Energy Management Program: Predictive Maintenance on Delicious Rank Federal Energy Management Program: Predictive Maintenance on Digg Find More places to share Federal Energy Management Program: Predictive Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Reactive Preventive Predictive Reliability-Centered Major Equipment Types Resources

258

Institute for Software Technology Maintenance Proze  

E-Print Network (OSTI)

Maintenance Institute for Software Technology Ersatz es bestehenden Systems Idee: Maintenance ist teuer. Durch! #12;VU Software Maintenance Institute for Software Technology Fehler im neuen System Software ist Management berücksichtigt Maintenance-Ziele und Rahmenbedingungen VU Software Maintenance Institute

259

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

7BA003539 7BA003539 Maintenance Sheet for 2011 Hyundai Sonata Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 7/19/2011 5,720 Changed oil and filter $14.67 10/12/2011 11,152 Changed oil and filter and rotated tires $60.49 10/21/2011 12,342 Upgraded ECU (TG5), replaced NVLD pressure sensor (TG6), and replaced cooling fan resistor (TG8) warranty 11/21/2011 16,442 Changed oil and filter $43.22 12/20/2011 22,497 Changed oil and filter and rotated tires $56.85 1/24/2012 28,205 Changed oil and filter $41.85 2/6/2012 30,100 30K service $109.16 2/9/2012 30,460 Recall: replaced two high voltage connectors at the HPCU n/c 2/27/2012 33,208 Changed oil and filter and rotated tires $56.85 3/24/2012 40,809 Changed oil and filter $41.85 4/20/2012 47,580 Changed oil and filter and rotated tires

260

Operations and Maintenance Program Implementation | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Implementation Program Implementation Operations and Maintenance Program Implementation October 4, 2013 - 5:16pm Addthis Implementing an effective operations and maintenance (O&M) program requires patience and persistence. This is especially true since no universal plan fits all Federal agencies. While no universal plan exists, Federal Energy Management Program (FEMP) recommends the following common steps for implementing O&M programs: Start small: Choose a project that is manageable and can be completed in a short period of time (e.g., six months to one year) Select troubled equipment: Choose a project with visibility because of problematic equipment history Minimize risk: Choose a project that provides immediate and positive results; this project must be successful, so risk of failure should be

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

IRF-World Road Statistics | Open Energy Information  

Open Energy Info (EERE)

IRF-World Road Statistics IRF-World Road Statistics Jump to: navigation, search Tool Summary LAUNCH TOOL Name: IRF-World Road Statistics Agency/Company /Organization: International Road Statistics Focus Area: Transportation, Economic Development Resource Type: Dataset Website: www.irfnet.org/statistics.php Cost: Paid IRF-World Road Statistics Screenshot References: IRF-World Road Statistics[1] "IRF World Road Statistics (WRS) compiles the most up-to-date official international road, traffic and transport data. The publication further provides a selection of the latest Sustainable Development Indicators and other data of key relevance, not only to industry and business but also to leading international organisations and financial institutions." References ↑ "IRF-World Road Statistics"

262

U.S. DEPARTMENT OF ENERGY EERE PROJECT MA>" AGEMENT CENTER NEPA DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MA>" AGEMENT CENTER MA>" AGEMENT CENTER NEPA DETERMINATION RECIPIENT:Oregon Department of Energy PROJECT TITLE: Oregon EECBG Fonnula - City of Winston Page I of3 STATE: OR Funding Opportunity Announcement Number DE-FOA-OOOOO13 Procurement Instrument Number NEPA Control Number em Number EEO Based on my review crthe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4Sl.I A), I have made the (ollowing determination: ex, EA, EIS APPENDIX AND NUMBER: Description : B1.3 Routine maintenance activities and custodial services for buildings, structures, rights-of-way, infrastructures (e.g .* pathways, roads, and railroads ), vehides and eqUipment, and localized vegetatJon and pest control, dunng which operations may be suspended and resumed. Custodial services are activities to preserve facility appearance, worl

263

Maintenance-free automotive battery  

SciTech Connect

Two types of maintenance-free automotive batteries were developed by Japan Storage Battery Co. to obtain a maintenance-free battery for practical use and to prevent deterioration of the battery during long storage and/or shipment. Design considerations included a special grid alloy, the separator, plate surface area, vent structure, and electrolyte. Charge characteristics, overcharge characteristics, life characteristics under various conditions, and self-discharge characteristics are presented. The characteristics of the maintenance-free battery with a Pb-Ca alloy grid are superior to those of a conventional battery. 10 figures, 1 table. (RWR)

Kano, S.; Ando, K.

1978-01-01T23:59:59.000Z

264

Nuclear Maintenance Applications Center: Maintenance Engineer Fundamentals Handbook  

Science Conference Proceedings (OSTI)

Power plant engineering is a specialized form of engineering not usually taught in universities. In an effort to provide degreed mechanical, electrical, chemical, civil, and nuclear engineers and maintenance specialists the practical information needed to quickly become effective plant engineers, the Electric Power Research Institute (EPRI) developed the Maintenance Engineer Fundamentals Handbook: An EPRI Course (TR-106853) and corresponding training course in 1996. As the retirement rate of today's hig...

2007-12-20T23:59:59.000Z

265

Nuclear Maintenance Applications Center: Preventive Maintenance Program Guideline  

Science Conference Proceedings (OSTI)

Over the years, the Electric Power Research Institute (EPRI) has developed many technical documents to aid in developing effective preventive, predictive, and condition monitoring maintenance programs to ensure equipment reliability and availability. The industry has drawn on this information to establish or enhance preventive maintenance (PM) programs. However, not all PM program processes have been implemented, leaving some programs marginally effective and vulnerable to failure. The purpose of this re...

2011-07-11T23:59:59.000Z

266

Nuclear Maintenance Applications Center: Crane Maintenance and Application Guide  

Science Conference Proceedings (OSTI)

This report is an update to the original guideline, published in December 2000 as Electric Power Research Institute (EPRI) report 1000986, and supersedes it in its entirety. This updated guide provides technical, maintenance, operational, training, inspection, and troubleshooting information for overhead bridge cranes used in nuclear power plants. Individual utilities can use this guide as a reference document that provides detailed component information, in-depth overhead bridge crane maintenance practi...

2011-03-07T23:59:59.000Z

267

Predictive Maintenance Primer: Revision to NP-7205  

Science Conference Proceedings (OSTI)

The "Predictive Maintenance Primer" revision provides nuclear plant personnel with current information regarding the predictive maintenance technologies and their applications. This guide will assist a plant in improving its predictive maintenance program.

2003-11-06T23:59:59.000Z

268

Optimal scheduling of fighter aircraft maintenance  

E-Print Network (OSTI)

The effective scheduling of fighter aircraft maintenance in the Air Force is crucial to overall mission accomplishment. An effective maintenance scheduling policy maximizes the use of maintenance resources and aircraft ...

Cho, Philip Y

2011-01-01T23:59:59.000Z

269

Robust Maintenance Policies in Asset Management  

E-Print Network (OSTI)

Optimal Maintenance and Repair Policies in Asset ManagementROBUST MAINTENANCE POLICIES IN ASSET MANAGEMENT Kenneth D.management policies and shows how the proposed approach may reduce maintenance and

Kuhn, Kenneth D.; Madanat, Samer M.

2005-01-01T23:59:59.000Z

270

Condon Wind Project Draft Environmental Impact Statement  

DOE Green Energy (OSTI)

BPA needs to acquire resources to meet its customers' load growth. In meeting that need for power, BPA will consider the following purposes: protecting BPA and its customers against risk by diversifying its resource portfolio; assuring consistency with its responsibilities under the Pacific Northwest Electric Power Planning and Conservation Act to encourage the development of renewable resources; meeting customer demand for renewable resources; assuring consistency with its resource acquisition strategy; and meeting the objectives of its Power Business Line's Strategic Plan. The Draft Environmental Impact Statement (DEIS) evaluates the environmental impacts of the Proposed Action (to execute one or more power purchase and transmission services agreements to acquire and transmit up to the full electric output of the proposed Condon Wind Project) and the No Action Alternative. BPA's preferred alternative is the Proposed Action. BPA has also identified the Proposed Action as the environmentally-preferred alternative. The proposed wind project is located on private agricultural land in Gilliam County, Oregon. The 38-acre project site is located within a 4,200-acre study area located on both sides of Oregon Highway 206, approximately 5 miles northwest of the town of Condon. The project would use modern, efficient 600-kilowatt (kW) wind turbines to convert energy in the winds to electricity that would be transmitted over the existing BPA transmission system. The project would consist of one or two phases: the first phase would use 41 wind turbines to yield a capacity of approximately 24.6 megawatts (MW). A second phase (if built) would use 42 wind turbines to yield a capacity of approximately 25.2 MW. For purposes of this DEIS, the size of the project is assumed to be 49.8 MW, built in two phases. Major components of the wind project include wind turbines and foundations, small pad-mounted transformers, an operation and maintenance building, power collection and communication cables, project access roads, meteorological towers on foundations, and a substation. During construction there would also be temporary equipment storage and construction staging areas. The first phase is proposed for construction in late 2001; the second phase could be constructed during spring/summer 2002 or later.

N /A

2001-06-01T23:59:59.000Z

271

Monitoring the recovery of decommissioned roads with citizen scientists in the Clearwater National Forest, Idaho  

E-Print Network (OSTI)

monitoring following road decommissioning . Wildlands CPR,research on road decommissioning, which will in turn allowService. 2003. Road decommissioning monitoring report 2002.

Court, Katherine; Switalski, T. Adam; Broberg, Len; Lloyd, Rebecca

2005-01-01T23:59:59.000Z

272

Wildlife Use of Open and Decommissioned Roads on the Clearwater National Forest, Idaho  

E-Print Network (OSTI)

the effectiveness of road decommissioning (Switalski et al.hunting season. Road decommissioning has been recommended toresulting from road decommissioning has also been predicted

Switalski, T. Adam; Broberg, Len; Holden, Anna

2007-01-01T23:59:59.000Z

273

A Comparison of Canadian and U.S. Hydro Operations and Maintenance Practices  

Science Conference Proceedings (OSTI)

Phase 1 of the Comparison of Canadian & American Hydro Operations & Maintenance Practices project indicates that hydroelectric plants in Canada have significantly lower operations and maintenance (O&M) costs than those in the United States. Phase 2, focused on a more in-depth investigation, will begin as soon as permission is granted by the respective plant owners.

1997-12-22T23:59:59.000Z

274

End of the road for Roadrunner  

NLE Websites -- All DOE Office Websites (Extended Search)

End of the road for Roadrunner End of the road for Roadrunner End of the road for Roadrunner Roadrunner, the first supercomputer to break the once-elusive petaflop barrier-one million billion calculations per second-will be decommissioned on Sunday, March 31. March 29, 2013 Roadrunner, the first supercomputer to break the once-elusive petaflop barrier-one million billion calculations per second-will be decommissioned on Sunday, March 31. Roadrunner will be decommissioned on March 31. Contact Kevin Roark Communications Office (505) 665-9202 Email Roadrunner got everyone thinking in new ways about how to build and use a supercomputer. Once the World's Fastest Supercomputer; Central to the Success of Stockpile Stewardship LOS ALAMOS, N. M., March 29, 2013-Roadrunner, the first supercomputer to

275

Federal Energy Management Program: Computerized Maintenance Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Computerized Computerized Maintenance Management Systems to someone by E-mail Share Federal Energy Management Program: Computerized Maintenance Management Systems on Facebook Tweet about Federal Energy Management Program: Computerized Maintenance Management Systems on Twitter Bookmark Federal Energy Management Program: Computerized Maintenance Management Systems on Google Bookmark Federal Energy Management Program: Computerized Maintenance Management Systems on Delicious Rank Federal Energy Management Program: Computerized Maintenance Management Systems on Digg Find More places to share Federal Energy Management Program: Computerized Maintenance Management Systems on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management

276

Federal Energy Management Program: Operations and Maintenance...  

NLE Websites -- All DOE Office Websites (Extended Search)

and Maintenance Program Management to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Program Management on Facebook Tweet about...

277

Federal Energy Management Program: Computerized Maintenance Management...  

NLE Websites -- All DOE Office Websites (Extended Search)

Computerized Maintenance Management Systems Computerized maintenance management systems (CMMS) are a type of management software that perform functions in support of operations and...

278

Federal Energy Management Program: Operations and Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Find out about effective metering at Federal facilities Computerized Maintenance Management Systems: Learn about the evaluation and integration of these systems Maintenance...

279

Federal Energy Management Program: Operations and Maintenance...  

NLE Websites -- All DOE Office Websites (Extended Search)

and Maintenance Best Practices Guide to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Best Practices Guide on Facebook Tweet about...

280

HEV Fleet Testing Maintenance Sheet  

NLE Websites -- All DOE Office Websites (Extended Search)

Bicyclist rams vehicle denting hood. Damage not repaired. (not included in maintenance costs) ---- 10292002 9,594 Oil change 20.67 1242003 12,953 Oil change 20.67 623...

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

An Outlook on Truth Maintenance  

E-Print Network (OSTI)

Truth maintenance systems have been used in several recent problem solving systems to record justifications for deduced assertions, to track down the assumptions which underlie contradictions when they arise, and to ...

McAllester, David A.

1980-08-01T23:59:59.000Z

282

Annual summary report of the Decontamination and Decommissioning Surveillance and Maintenance Program at Oak Ridge National Laboratory for period ending September 30, 1994  

Science Conference Proceedings (OSTI)

The Surplus Facilities Management Program (SFMP) was established at Oak Ridge National Laboratory (ORNL) in 1976 to provide collective management of all surplus sites under ORNL`s control on the Oak Ridge Reservation. Presently, over 50 facilities, grouped into projects, are currently managed by the Decontamination and Decommissioning Program, the successor program to the SFMP. Support includes (1) surveillance and maintenance planning; (2) routine surveillance and maintenance; and (3) special maintenance projects. This report documents routine surveillance and maintenance, special projects, and special maintenance performed on these facilities for the period of October 1993 through September 1994.

Anderson, L.A. [comp.; Burwinkle, T.W.; Ford, M.K.; Gaddis, H.R.; Holder, L. Jr.; Mandry, G.J.; Nelson, T.R.; Patton, B.D.

1995-03-01T23:59:59.000Z

283

Maintenance of DOE Technical Standards  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TECHNICAL STANDARDS TECHNICAL STANDARDS PROGRAM PROCEDURES DOE-TSPP-9 Revision: 5 Date: August 1, 2000 MAINTENANCE OF DOE TECHNICAL STANDARDS U.S. Department of Energy Office of Nuclear Safety Policy and Standards Washington, D.C. 20585 DOE-TSPP-9 Maintenance Revision: 5 Date: August 1, 2000 DOE Technical Standards Program i CONTENTS Paragraph Page 1. SCOPE........................................................................................................................................... 1 1.1 Purpose ................................................................................................................... 1 1.2 Applicability.............................................................................................................. 1

284

Condition-Based Maintenance Guideline  

Science Conference Proceedings (OSTI)

Since the 1980s, EPRI has published various documents relating to predictive or condition-based maintenance (CBM) programs. These documents have served as a foundation for predictive maintenance programs within our industry. Many of these published documents are now more than 10 years old. As a result, EPRI is reviewing these documents to compare them with current practices and programs. EPRIs initial goal is to revise and update the guidance and create a principal core document on predictive and conditi...

2011-11-16T23:59:59.000Z

285

HCEI Road Map: 2011 Edition (Brochure)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Road Map Road Map 2011 Edition 2 www.hawaiicleanenergyinitiative.org The Hawaii Clean Energy Initiative (HCEI) was founded based on a Memorandum of Understanding (MOU) between the State of Hawaii and the U.S. Department of Energy on Jan. 28, 2008. Upon inception, the State and the Department worked to form a series of working groups incorporating a variety of stakeholders throughout the state, including local government, not-for-profit organizations, private sector companies, trade associations, Department of Defense representatives (including PACOM) and academic organizations, among others. These working groups form

286

HCEI Road Map: 2011 Edition (Brochure)  

NLE Websites -- All DOE Office Websites (Extended Search)

HCEI Road Map HCEI Road Map 2011 Edition 2 www.hawaiicleanenergyinitiative.org The Hawaii Clean Energy Initiative (HCEI) was founded based on a Memorandum of Understanding (MOU) between the State of Hawaii and the U.S. Department of Energy on Jan. 28, 2008. Upon inception, the State and the Department worked to form a series of working groups incorporating a variety of stakeholders throughout the state, including local government, not-for-profit organizations, private sector companies, trade associations, Department of Defense representatives (including PACOM) and academic organizations, among others. These working groups form

287

HFIR Plant Maintenance - August  

NLE Websites -- All DOE Office Websites (Extended Search)

April 2012 April 2012 2 Managed by UT-Battelle for the U.S. Department of Energy ORNL Isotope Infrastructure Public Release of CASL Infrastructure Software The Lightweight Integrating Multiphysics Environment (LIME), which has formed the infrastructure for the simulation tools being developed within the Consortium for Advanced Simulation of Light-Water Reactors (CASL), has been publicly-released under an open-source license: * http://sourceforge.net/projects/lime1/ 3 Managed by UT-Battelle for the U.S. Department of Energy ORNL Isotope Infrastructure Key Highlights and Activities * Jess Gehin and Syd Ball participated in the Subgroup Technical Meeting under the US- Russia Civil NE Cooperation Action Plan as the respective US Leads for Small Modular Reactors and High-Temperature Gas Reactors.

288

Alternative Fuels Data Center: Electric Vehicle (EV) Road User Assessment  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Road User Assessment System Pilot to someone by E-mail Road User Assessment System Pilot to someone by E-mail Share Alternative Fuels Data Center: Electric Vehicle (EV) Road User Assessment System Pilot on Facebook Tweet about Alternative Fuels Data Center: Electric Vehicle (EV) Road User Assessment System Pilot on Twitter Bookmark Alternative Fuels Data Center: Electric Vehicle (EV) Road User Assessment System Pilot on Google Bookmark Alternative Fuels Data Center: Electric Vehicle (EV) Road User Assessment System Pilot on Delicious Rank Alternative Fuels Data Center: Electric Vehicle (EV) Road User Assessment System Pilot on Digg Find More places to share Alternative Fuels Data Center: Electric Vehicle (EV) Road User Assessment System Pilot on AddThis.com... More in this section... Federal State Advanced Search

289

Classified road detection from satellite images based on perceptual organization  

Science Conference Proceedings (OSTI)

Extracting roads from satellite images is an important task in both research and practice. This work presents an improved model for road detection based on the principles of perceptual organization and classification fusion in human vision system (HVS). ...

J. Yang; R. S. Wang

2007-10-01T23:59:59.000Z

290

Project information  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Information Amistad Project (Texas) Collbran Project (Colorado) Colorado River Storage Project Dolores Project (Colorado) Falcon Project (Texas) Provo River Project (Utah)...

291

Loss of Cherished Places -- Place Character and Climate Change along Australia's Great Ocean Road  

E-Print Network (OSTI)

Change along Australia’s Great Ocean Road Ray Green The paceStudies along the Great Ocean Road The research discussedplace along Australia’s Great Ocean Road. 5 The road, in the

Green, Ray

2008-01-01T23:59:59.000Z

292

The State of the Region HAMPTON ROADS 2011  

E-Print Network (OSTI)

and Frank Batten Jr. Foundation Hampton Roads Chamber of Commerce R. Bruce Bradley Kaufman and Canoles Ramon

293

Campus Security 1951 East-West Road  

E-Print Network (OSTI)

Campus Security 1951 East-West Road Honolulu, Hawai`i 96822 Telephone: (808) 956-9293 Fax: (808 First Female Campus Security Captain Alberta J.K. Pukahi Brings Unique Perspectives to the Position (HONOLULU, HI, December 10, 2012) University of Hawai`i at Mnoa's Campus Security and Emergency Management

294

Road traffic model using distributed camera network  

Science Conference Proceedings (OSTI)

Traffic monitoring/prediction using a distributed camera network is presented in this paper. The activities on each road link are monitored and features are derived to identify the pattern. Then it is learnt, classified, predicted and communicated to ... Keywords: hidden Markov model, spatial interest points, spatial-temporal interest points, traffic classification, traffic prediction, traffic surveillance

S. Indu; Sankalp Arora; Santanu Chaudhury; Asok Bhattacharyya

2010-12-01T23:59:59.000Z

295

Real-time turbine maintenance system  

Science Conference Proceedings (OSTI)

Reliable power generation and low maintenance costs are the major goals of power plant administration. This goal, in fact, can be achieved by a proper turbine maintenance policy. This study presents a model for total productive maintenance to enhance ... Keywords: Radio frequency identification, Total productive maintenance, Turbine

Tung-Liang Chen

2009-05-01T23:59:59.000Z

296

Generator Bushing Installation and Maintenance Guide  

Science Conference Proceedings (OSTI)

This report is a comprehensive guide to generator high-voltage bushing (HVB) installation and maintenance.

2008-12-04T23:59:59.000Z

297

NMAC Post Maintenance Testing Guide, Revision 1  

Science Conference Proceedings (OSTI)

This Nuclear Maintenance Applications Center (NMAC) guide addresses the concern of member utilities regarding the adequacy and consistency of post-maintenance testing programs. The guide provides information on structuring, developing, organizing, and controlling a post-maintenance testing program in a power plant. It stresses the importance of advance planning to post-maintenance testing.

2004-12-08T23:59:59.000Z

298

Hierarchy decomposition for faster user equilibria on road networks  

Science Conference Proceedings (OSTI)

The road traffic of an entire day for a certain region can be understood as a flow with sources and sinks on the road network. Traffic has the tendency to evade regularly clogged roads and other bottlenecks, especially with modern on-board navigation ...

Dennis Luxen; Peter Sanders

2011-05-01T23:59:59.000Z

299

Studying (non-planar) road networks through an algorithmic lens  

Science Conference Proceedings (OSTI)

This paper studies real-world road networks from an algorithmic perspective, focusing on empirical studies that yield useful properties of road networks that can be exploited in the design of fast algorithms that deal with geographic data. Unlike previous ... Keywords: Voronoi diagrams, algorithmic lens, circle arrangements, disk neighborhood systems, multiscale-dispersed graphs, road networks, shortest paths

David Eppstein; Michael T. Goodrich

2008-11-01T23:59:59.000Z

300

Renewable Energy Project Funding | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Renewable Energy Project Funding Renewable Energy Project Funding Renewable Energy Project Funding October 16, 2013 - 5:15pm Addthis Renewable Energy Project Funding Planning, Programming & Budgeting Building Design Project Construction Commissioning Operations & Maintenance Federal energy projects require funding to generate results. Agencies trying to stretch their capital budget for a construction project should investigate renewable energy project funding options outside the traditional appropriated budget process. Carefully matching available funding tools with specific project needs can make the difference between a stalled, unfunded renewable energy project and a successful project that generates energy and cost savings. Federal agencies may be able to use tools to finance renewable energy

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

CRAD, Maintenance Assessment Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Maintenance Assessment Plan Maintenance Assessment Plan CRAD, Maintenance Assessment Plan Performance Objective: An effective facilities maintenance program should optimize the material condition of components and equipment to support safe and effective operations and ensure the peak performance and reliability of those systems and equipment important to operations. Criteria: The program, facility or operation has a Maintenance Implementation Plan (MIP), or equivalent document, which defines and documents the approach to conduct of maintenance. The maintenance organization structure is well defined and understood. Responsibilities, organizational interfaces, and administrative activities are adequately defined and implemented to provide timely availability of parts, materials, and services needed to support the

302

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT RESEARCH ROADMAP Energy Commission Prepared by: California Institute for Energy and Environment #12; Prepared National Laboratory One Cyclotron Road, Berkeley, CA 94720 Energy Commercialization, LLC 375 Cameron Circle

303

Operations and Maintenance Manual for Large Aperture Scanner System  

Science Conference Proceedings (OSTI)

Operations and maintenance manual includes detailed instructions for system assembly, use, and maintenance.

Jones, Anthony M.; Hall, Thomas E.

2010-04-08T23:59:59.000Z

304

NEPA REVIEW LASO-10-002 CATEGORICAL EXCLUSION PAJARITO ROAD RIGHT-OF-WAY SHIFT AT TA-50 AND TA-55  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REVIEW REVIEW LASO-10-002 CATEGORICAL EXCLUSION PAJARITO ROAD RIGHT-OF-WAY SHIFT AT TA-50 AND TA-55 1. DESCRIPTION OF PROPOSED ACTION: LANL proposes to shift a segment of Pajarito Road slightly to the south along the edge of Two-Mile Canyon in the vicinity of TA-55. The existing centerline would be moved between 36 feet and 56 feet depending on final designs. This shift would address the need to integrate security requirements related to the Chemistry and Metallurgy Building Replacement Project (CMRR) and the Nuclear Materials Safeguards and Security Upgrades Project (NMSSIJP) - specifically placement of the Perimeter Intrusion Detection, Assessment, and Delay System fence improvements in proximity to Pajarito Road. Pajarito Road is not open to the public and is secured to preclude unauthorized access to the facilities between

305

Project 328  

NLE Websites -- All DOE Office Websites (Extended Search)

5 CONTACTS Gary J. Stiegel Gasification Technology Manager National Energy Technology Laboratory 626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236 412-386-4499...

306

Optimized Maintenance of Generator Rotors  

Science Conference Proceedings (OSTI)

Generator rotor maintenance options are limited and expensive. The timing and scope of work done requires optimization to obtain the maximum benefits for continued long-term trouble-free operation. This document is a comprehensive guide to the maintenance of large generator rotors of 2 and 4 pole design that are cooled directly or indirectly by air or hydrogen. These include 50 and 60 Hz machines, operating at speeds of 1500, 1800, 3000, and 3600 RPM. The guide does not cover water-cooled rotors. The inf...

2004-12-13T23:59:59.000Z

307

Plant maintenance and advanced reactors, 2005  

SciTech Connect

The focus of the September-October issue is on plant maintenance and advanced reactors. Major articles/reports in this issue include: First U.S. EPRs in 2015, by Ray Ganthner, Framatome ANP; Pursuing several opportunities, by William E. (Ed) Cummins, Westinghouse Electric Company; Vigorous plans to develop advanced reactors, by Yuliang Sun, Tsinghua University, China; Multiple designs, small and large, by Kumiaki Moriya, Hitachi Ltd., Japan; Sealed and embedded for safety and security, by Handa Norihiko, Toshiba Corporation, Japan; Scheduled online in 2010, by Johan Slabber, PMBR (Pty) Ltd., South Africa; Multi-application reactors, by Nikolay G. Kodochigov, OKBM, Russia; Six projects under budget and on schedule, by David F. Togerson, AECL, Canada; Creating a positive image, by Scott Peterson, Nuclear Energy Institute (NEI); Advanced plans for nuclear power's renaissance, by John Cleveland, International Atomic Energy Agency, Austria; and, Plant profile: last five outages in less than 20 days, by Beth Rapczynski, Exelon Nuclear.

Agnihotri, Newal (ed.)

2005-09-15T23:59:59.000Z

308

Plant maintenance and advanced reactors, 2007  

Science Conference Proceedings (OSTI)

The focus of the September-October issue is on plant maintenance and advanced reactors. Major articles/reports in this issue include: A new day for energy in America; Committed to success more than ever, by Andy White, GE--Hitachi Nuclear Energy; Competitive technology for decades, by Steve Tritch, Westinghouse Electric Company; Pioneers of positive community relationship, by Exelon Nuclear; A robust design for 60-years, by Ray Ganthner, Areva; Aiming at no evacuation plants, by Kumiaki Moriya, Hitachi-GE Nuclear Energy, Ltd.; and, Desalination and hydrogen economy, by Dr. I. Khamis, International Atomic Energy Agency. Industry innovation articles in this issue are: Reactor vessel closure head project, by Jeff LeClair, Prairie Island Nuclear Generating Plant; and Submersible remote-operated vehicle, by Michael S. Rose, Entergy's Fitzpatrick Nuclear Station.

Agnihotri, Newal (ed.)

2007-09-15T23:59:59.000Z

309

Reliability centered maintenance of power transformers and circuit breakers  

SciTech Connect

At the Bonneville Power Administration (BPA), we have historically maintained high voltage equipment. Including transformers and power circuit breakers, on a time driven basis. While this has served our needs in the past, newer methods are needed to effectively maintain the power system in future years. Today aging equipment, maintenance backlogs, and budget constraints are a reality. BPA has initiated a research and development project to examine reliability centered maintenance (RCM) as an alternative to time based maintenance on high voltage equipment. Under RCM, the performance of each place of equipment is to be monitored by observing many operating parameters. For example, with circuit breakers we will observe (measure) the trip time, accumulated contact wear using I{sup 2}T, timing of the mechanism, plus several other parameters. Equipment performing below a predetermined level, or equipment having accumulated a large amount of ``usage`` will receive maintenance. The maintenance will restore full performance and preserve an acceptable service life for that piece of equipment. To develop and evaluate RCM concepts, BPA is installing a prototype system at our Alvey Substation on 4 transformers and 25 breakers.

Purucker, S.L.; Goeltz, R.T. [Oak Ridge National Lab., TN (United States); Hemmelman, K.; Price, R. [Bonneville Power Administration, Van Couver, WA (United States)

1992-08-01T23:59:59.000Z

310

Great Plains Coal Gasification Project:  

Science Conference Proceedings (OSTI)

This progress report on the Great Plains Coal Gasification Project discusses Lignite coal, natural gas, and by-products production as well as gas quality. A tabulation of raw material, product and energy consumption is provided for plant operations. Capital improvement projects and plant maintenance activities are detailed and summaries are provided for environmental, safety, medical, quality assurance, and qualtiy control activities.

Not Available

1988-01-29T23:59:59.000Z

311

Life Cycle Assessment Comparing the Use of Jatropha Biodiesel in the Indian Road and Rail Sectors  

SciTech Connect

This life cycle assessment of Jatropha biodiesel production and use evaluates the net greenhouse gas (GHG) emission (not considering land-use change), net energy value (NEV), and net petroleum consumption impacts of substituting Jatropha biodiesel for conventional petroleum diesel in India. Several blends of biodiesel with petroleum diesel are evaluated for the rail freight, rail passenger, road freight, and road-passenger transport sectors that currently rely heavily on petroleum diesel. For the base case, Jatropha cultivation, processing, and use conditions that were analyzed, the use of B20 results in a net reduction in GHG emissions and petroleum consumption of 14% and 17%, respectively, and a NEV increase of 58% compared with the use of 100% petroleum diesel. While the road-passenger transport sector provides the greatest sustainability benefits per 1000 gross tonne kilometers, the road freight sector eventually provides the greatest absolute benefits owing to substantially higher projected utilization by year 2020. Nevertheless, introduction of biodiesel to the rail sector might present the fewest logistic and capital expenditure challenges in the near term. Sensitivity analyses confirmed that the sustainability benefits are maintained under multiple plausible cultivation, processing, and distribution scenarios. However, the sustainability of any individual Jatropha plantation will depend on site-specific conditions.

Whitaker, M.; Heath, G.

2010-05-01T23:59:59.000Z

312

Substation battery-maintenance procedures  

SciTech Connect

The frequency of substation battery failures is gratifyingly low. One trouble spot appears to be extraneous short circuits that drain an otherwise healthy battery. Use of the lead--calcium battery promises to reduce substantially the amount of maintenance that substation batteries need.

Timmerman, M.H.

1976-05-15T23:59:59.000Z

313

Timber Road II | Open Energy Information  

Open Energy Info (EERE)

II II Jump to: navigation, search Name Timber Road II Facility Timber Road II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Horizon Wind Energy Developer Horizon Wind Energy Energy Purchaser American Electric Power Location Near Payne OH Coordinates 41.023524°, -84.717185° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.023524,"lon":-84.717185,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

314

EPA Energy Strategy For The Road Ahead  

NLE Websites -- All DOE Office Websites (Extended Search)

Strategy Strategy for the Road Ahead Scenario Thinking for Business Executives and Corporate Boards 2007 GBN Global Business Network * Energy Strategy for the Road Ahead Printed on 100% recycled paper Copyright 2007 Global Business Network, a member of the Monitor Group. The U.S. Environmental Protection Agency (U.S. EPA) and its ENERGY STAR ® Program supported this effort. We encourage readers to use and share the content of this report, with the understanding that it is the intellectual property of Global Business Network and U.S. EPA ENERGY STAR ® , and that full attribution is required. 101 Market Street, Suite 1000 * San Francisco, CA 94105 * Telephone: (415) 932-5400 * Fax: (415) 932-5401

315

Early Cook County Roads -- Part Two  

NLE Websites -- All DOE Office Websites (Extended Search)

Two Two Nature Bulletin No. 739 January 18, 1964 Forest Preserve District of Cook County Seymour Simon, President Roberts Mann, Conservation Editor EARLY COOK COUNTY ROADS -- PART TWO -- THE PLANK ROAD ERA For ten years after Chicago, with a population of 4,170, was chartered as a city in 1837, its commerce and growth were crippled by wretched transportation to and from the hinterlands. During many periods of each year it was surrounded and isolated by mud. To be sure, there were dirt thoroughfares in all directions, graded and drained as best they could in those days, but not surfaced. No one who has never experienced it can appreciate how gooey and gluey a black prairie soil can be when wet. A wagon's wheels often become solid cylinders of mud as wide as a bass drum.

316

A road map for implementing systems engineering  

SciTech Connect

Studies by academia, industry, and government indicate that applying a sound systems engineering process to development programs is an important tool for preventing cost and schedule overruns and performance deficiencies. There is an enormous body of systems engineering knowledge. Where does one start? How can the principles of systems engineering be applied in the Sandia environment? This road map is intended to be an aid to answering these questions.

Dean, F.F. [Sandia National Labs., Albuquerque, NM (United States). New Mexico Weapons Systems Engineering Center; Bentz, B.; Bahill, A.T. [Univ. of Arizona, Tucson, AZ (United States)

1997-02-01T23:59:59.000Z

317

INL Wind Farm Project Description Document  

DOE Green Energy (OSTI)

The INL Wind Farm project proposes to install a 20 MW to 40 MW wind farm on government property, consisting of approximately ten to twenty full-sized (80-meter hub height) towers with 2 MW turbines, and access roads. This includes identifying the optimal turbine locations, building access roads, and pouring the tower foundations in preparation for turbine installation. The project successfully identified a location on INL lands with commercially viable wind resources (i.e., greater than 11 mph sustained winds) for a 20 to 40 MW wind farm. Additionally, the proposed Wind Farm was evaluated against other General Plant Projects, General Purpose Capital Equipment projects, and Line Item Construction Projects at the INL to show the relative importance of the proposed Wind Farm project.

Gary Siefert

2009-07-01T23:59:59.000Z

318

Environmental Survey Report for the ETTP: Environmental Management Waste Management Facility (EMWMF) Haul Road Corridor, Oak Ridge, Tennessee  

SciTech Connect

This report summarizes the results of environmental surveys conducted within the corridor of a temporary haul road (''Haul Road'') to be constructed from East Tennessee Technology Park (ETTP) to the Environmental Management Waste Management Facility (EMWMF) located just west of the Y-12 National Security Complex (Y-12). Environmental surveys were conducted by natural resource experts at Oak Ridge National Laboratory who routinely assess the significance of various project activities on the Oak Ridge Reservation (ORR). ORNL assistance to the Haul Road Project included environmental assessments necessary to determine the best route for minimizing impacts to sensitive resources such as wetlands or rare plants. Once the final route was chosen, environmental surveys were conducted within the corridor to evaluate the impacts to sensitive resources that could not be avoided. The final Haul Road route follows established roads and a power-line corridor to the extent possible (Fig. 1). Detailed explanation regarding the purpose of the Haul Road and the regulatory context associated with its construction is provided in at least two major documents and consequently is not presented here: (1) Explanation of Significant Differences for the Record of Decision for the Disposal of Oak Ridge Reservation Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Waste, Oak Ridge, Tennessee (January 2005, DOE/OR/01-2194&D2), and (2) Environmental Monitoring Plan for The ETTP to EMWMF Haul Road for the Disposal of Oak Ridge Reservation Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Waste, Oak Ridge, Tennessee (April 2005, BJC/OR-2152). The focus of this report is a description of the sensitive resources to be impacted by Haul Road construction. Following a short description of the methods used for the environmental surveys, results and observations are presented in the following subsections: (1) General description of the affected environment; (2) Rare plants and vegetation assemblages; (3) Rare wildlife and their habitat; (4) Rare aquatic species; and (5) Wetlands/Floodplains. A summary of project actions taken or planned in order to avoid, minimize, or mitigate the environmental impacts associated with this project are summarized in the conclusion section of this report.

Peterson, M.J.

2005-12-20T23:59:59.000Z

319

Nuclear Maintenance Applications Center: Main Feedwater Pump Maintenance Guide  

Science Conference Proceedings (OSTI)

Loss of a main feedwater pump can have severe economic impact on a nuclear utility. The majority of forced outages or power reductions are believed to be attributed to nondesign issues. Case leaks, excessive vibration, seal leaks, and lubrication system problems are shown to significantly impact feedwater pump availability. Improved maintenance practices and increased attention to these issues are critical for realizing longevity of main feedwater ...

2012-11-14T23:59:59.000Z

320

Nuclear Maintenance Applications Center: Maintenance Work Package Planning Guidance  

Science Conference Proceedings (OSTI)

The work management process is one of the core business processes outlined within the Nuclear Energy Institute (NEI) Standard Nuclear Performance Model for operation and maintenance of nuclear power plants. The preparation of work packages is a key element of this overall process. The purpose of this report is to provide guidance to power plant personnel regarding work package quality as a supplement to Institute of Nuclear Power Operations (INPO) AP-928, Work Management Process Description. The ...

2013-09-10T23:59:59.000Z

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Computerized Maintenance Management Systems | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Areas » Operations & Maintenance » Computerized Program Areas » Operations & Maintenance » Computerized Maintenance Management Systems Computerized Maintenance Management Systems October 7, 2013 - 9:35am Addthis Computerized maintenance management systems (CMMS) are a type of management software that perform functions in support of operations and maintenance (O&M) programs. The software automates most of the logistical functions performed by O&M staff. Capabilities Typical CMMS functions depend on the complexity of the system chosen. Examples include: Work order generation, prioritization, and tracking by equipment and/or component. Work orders often can be sorted by equipment, date, person responding, etc. Tracking scheduled and unscheduled maintenance activities Storing technical documentation and maintenance procedures by

322

Federal Energy Management Program: Maintenance Types  

NLE Websites -- All DOE Office Websites (Extended Search)

Maintenance Types Maintenance Types Proper operations and maintenance (O&M) goes beyond repairing equipment after it breaks. Several maintenance strategies exist to prevent systems disrepair and degradation. A combination of the following can ensure an optimal blend of cost and life-cycle effectiveness: Reactive Maintenance: Follows a "run it until it breaks" strategy. No action or effort is taken to maintain equipment, prevent failure, or ensure life of the system - even if actions are suggested by the manufacturer. Preventive Maintenance: Refers to a series of actions performed on calendar time or machine run time schedules. Predictive Maintenance: Strives to detect the onset of equipment degradation and address the problems as they are identified. Several predictive maintenance technologies exist.

323

Electric Motor Predictive Maintenance: Draft Guidelines  

Science Conference Proceedings (OSTI)

Predictive Maintenance can enhance the early detection and avoidance of incipient equipment failures in electric motors. This report provides draft guidelines to support the development of electric motor predictive maintenance (EMPM) programs at utility sites.

1997-10-16T23:59:59.000Z

324

Improving maintenance operation through transformational outsourcing  

E-Print Network (OSTI)

Outsourcing maintenance to third-party contractors has become an increasingly popular option for manufacturers to achieve tactical and/or strategic objectives. Though simple in concept, maintenance outsourcing is difficult ...

Ye, Jacqueline Ming-Shih

2007-01-01T23:59:59.000Z

325

Maintenance cost studies of present aircraft subsystems  

E-Print Network (OSTI)

This report describes two detailed studies of actual maintenance costs for present transport aircraft. The first part describes maintenance costs for jet transport aircraft broken down into subsystem costs according to an ...

Pearlman, Chaim Herman Shalom

1966-01-01T23:59:59.000Z

326

African Easterly Jet: Structure and Maintenance  

Science Conference Proceedings (OSTI)

This article investigates the African easterly jet (AEJ), its structure, and the forcings contributing to its maintenance, critically revisiting previous work that attributed the maintenance of the jet to soil moisture gradients over tropical ...

Man-Li C. Wu; Oreste Reale; Siegfried D. Schubert; Max J. Suarez; Randy D. Koster; Philip J. Pegion

2009-09-01T23:59:59.000Z

327

EPRI Maintenance Excellence Matrix Revision Status  

Science Conference Proceedings (OSTI)

This report documents the progress in revising the Electric Power Research Institute EPRI 2002 Report 1004705, Maintenance Excellence Matrix Assessment Guideline for Fossil Power Plants, which provides utilities a comprehensive self-assessment guideline for improving maintenance processes.

2008-12-23T23:59:59.000Z

328

Generation Maintenance Applications Center: Combined Cycle Combustion Turbine Maintenance Guide for the Turbine Section of the Combu stion Turbine  

Science Conference Proceedings (OSTI)

Combustion turbine combined cycle (CTCC) facilities utilize various components that are unique to these types of power-generation plants and that are not typically found in a nuclear or fossil-power plant.  As such, use of the EPRI PM Basis Database (PMDB) by current owners of CTCC facilities is limited to only those components that are common to both types of power plants.  With the projected growth in the number of CTCC facilities, EPRI General Maintenance Applications Center (GenMAC) ...

2012-12-31T23:59:59.000Z

329

Generation Maintenance Application Center: Combined-Cycle Combustion Turbine Steam Turbine Stop and Control Valve Maintenance Guide  

Science Conference Proceedings (OSTI)

BackgroundCombustion turbine combined-cycle (CTCC) facilities use various components that are unique to these types of power generation plants. Therefore, use of the Electric Power Research Institute (EPRI) Preventive Maintenance Basis Database (1018758) by owners of CTCC facilities is somewhat limited to only those components that are common to both CTCC facilities and nuclear or fossil power plants. With the projected growth in the number of CTCC facilities, ...

2013-03-27T23:59:59.000Z

330

Generation Maintenance Applications Center: Combined Cycle Combustion Turbine Maintenance Guide for the Compressor Section of the C ombustion Turbine  

Science Conference Proceedings (OSTI)

Combustion turbine combined cycle (CTCC) facilities utilize various components that are unique to these types of power-generation plants and that are not typically found in a nuclear or fossil-power plant.  As such, use of the EPRI PM Basis Database (PMDB) by current owners of CTCC facilities is limited to only those components that are common to both types of power plants.  With the projected growth in the number of CTCC facilities, EPRI General Maintenance Applications Center (GenMAC) ...

2012-12-31T23:59:59.000Z

331

General Maintenance Applications Center: Combined Cycle Combustion Turbine Maintenance Guide for the Combustor Section of the Combus tion Turbine  

Science Conference Proceedings (OSTI)

Combustion turbine combined cycle (CTCC) facilities utilize various components that are unique to these types of power-generation plants and that are not typically found in a nuclear or fossil-power plant.  As such, use of the EPRI PM Basis Database (PMDB) by current owners of CTCC facilities is limited to only those components that are common to both types of power plants.  With the projected growth in the number of CTCC facilities, EPRI General Maintenance Applications Center (GenMAC) ...

2012-12-31T23:59:59.000Z

332

Mining Surveillance and Maintenance Dollars  

Science Conference Proceedings (OSTI)

Accelerating site cleanup to reduce facility risks to the workers, the public and the environment during a time of declining federal budgets represents a significant technical and economic challenge to U.S. Department of Energy (DOE) Operations Offices and their respective contractors. A significant portion of a facility's recurring annual expenses are associated with routine, long-term surveillance and maintenance (S&M) activities. However, ongoing S&M activities do nothing to reduce risks and basically spend money that could be reallocated towards facility deactivation. This paper discusses the background around DOE efforts to reduce surveillance and maintenance costs, one approach used to perform cost reviews, lessons learned from field implementation and what assistance is available to assist DOE sites in performing these evaluations.

MARTINEZ, R.

2000-02-01T23:59:59.000Z

333

Predictive Maintenance Program: Development and Implementation  

Science Conference Proceedings (OSTI)

Many forces -- the economy, competition, regulatory agencies -- are pressuring utilities to reduce operating and maintenance (O&M) costs without cutting back on reliability or availability. Many utility managers are re-evaluating their maintenance strategies to meet these demands. To show utilities how to reduce maintenance costs and extend the effective operating life of equipment, EPRI has organized an annual workshop around a unique management approach -- Predictive Maintenance (PDM).

1999-06-25T23:59:59.000Z

334

Africa's Transport Infrastructure Mainstreaming Maintenance and...  

Open Energy Info (EERE)

icon Twitter icon Africa's Transport Infrastructure Mainstreaming Maintenance and Management Jump to: navigation, search Tool Summary Name: Africa's Transport Infrastructure...

335

Wind Turbine Lubrication Maintenance Guide  

Science Conference Proceedings (OSTI)

With the rush to develop todays massive wind energy sites, more attention should be paid to the inevitable need to perform routine maintenance and develop practical means of assessing the condition of the components within the nacelles and other outside support equipment for the wind farms. Current operating models have not adequately established accurate assumptions or expectations on the unavailability of the windmills and the impact on lost generation. Contracts for purchase of their generation output...

2012-06-20T23:59:59.000Z

336

Categorical Exclusion for Maintenance Work  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Maintenance Work Maintenance Work along the Electrical District 5 to Saguaro segment (41/4 to 58/5) of the Maricopa-Saguaro 115-kV Transmission Line, between Friendly Comers and Marana, Pinal County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western plans to conduct maintenance work to maintain or improve the reliability and safety of electrical transmission along 17 miles of the Test Track (formerly Maricopa)-Saguaro 115-kV Transmission Line between Electrical District 5 and Saguaro Steam Plant Substations. The work includes replacing wood poles, cross arms, and knee braces in-kind at 27 structures (41/4-8, 4214, 43/6, 4417, 45/4,46/6,47/2,49/2,49/6,50/2,50/6,50/8,51/4, 52/3, 54/3, 5517, 56/1 57/1-3, 57/8 & 58/2-3), because the wood poles failed stability tests, cross arms are beyond

337

Electric Motor Predictive and Preventive Maintenance Guide  

Science Conference Proceedings (OSTI)

Electric motor failure could result in lost capacity as well as excessive repair and maintenance costs. This guide provides information on establishing an effective maintenance program to help prevent unexpected motor failures, costly downtime, and unnecessary maintenance costs. Specifically, the guide summarizes technical data relative to four basic power plant motor types and associated components.

1992-05-02T23:59:59.000Z

338

Streamlined Reliability Centered Maintenance Analysis Application Update  

Science Conference Proceedings (OSTI)

A systematic evaluation of plant equipment and maintenance requirements using reliability centered maintenance (RCM) techniques can help hold down operating costs while maintaining plant availability and reliability. This report describes the application of streamlined reliability centered maintenance (streamlined RCM) methodology and software at four utilities.

2001-10-18T23:59:59.000Z

339

Electrohydraulic Control (EHC) Fluid Maintenance Guide  

Science Conference Proceedings (OSTI)

The "Electrohydraulic Control (EHC) Fluid Maintenance Guide" provides plant personnel with information on the operation, maintenance, and performance of the electrohydraulic control (EHC) system. The contents of this guide will aid plant workers in improving EHC system reliability, performance, and plant maintenance practices.

2002-12-29T23:59:59.000Z

340

Robust Maintenance Policies for Markovian Systems under Model Uncertainty  

E-Print Network (OSTI)

of various pavement management maintenance actions, (MadanatOptimal maintenance decisions for pavement management,Optimal Maintenance and Repair Policies in Asset Management

Kuhn, Kenneth D.; Madanat, Samer M.

2005-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Robust maintenance policies for Markovian systems under model uncertainty  

E-Print Network (OSTI)

of various pavement management maintenance actions, (MadanatOptimal maintenance decisions for pavement management,Optimal Maintenance and Repair Policies in Asset Management

Kuhn, K D; Madanat, S M

2006-01-01T23:59:59.000Z

342

WSDOT highway maintenance: environmental compliance for protected terrestrial species  

E-Print Network (OSTI)

in figure 3. Maintenance Activity Best Management PracticesOlympic Region Maintenance Program on management recommen-If a maintenance activity is not exempt, Best Management

O’Brien, Tracie; Carey, Marion; Forrester, Bret

2005-01-01T23:59:59.000Z

343

On-Road Motor Vehicle Emissions Measurements  

E-Print Network (OSTI)

and maintenance are both important. Propane and CNG are NOT "cleaner burning". RSD is a very good tool but ... Measured grams pollutant per kg of fuel from RSD -quantifiable uncertainty Fuel sales from tax department inventories · Only need one week of work and fuel sales to get fuel based emissions inventories · RSD

Denver, University of

344

The Road Ahead for Light Duty Vehicle Fuel Demand  

U.S. Energy Information Administration (EIA)

The Road Ahead for Light Duty Vehicle Fuel Demand Joanne Shore Energy Information Administration July 7, 2005 Refining Capacity Surplus Shrank As Demand Grew ...

345

Road to AC Voltage Standard Leads to Important Junction  

Science Conference Proceedings (OSTI)

Road to AC Voltage Standard Leads to Important Junction. ... Grumman in the mid-1990s.*** A number of innovations since then have led to the first ...

2013-08-13T23:59:59.000Z

346

Tyre parameter identification from road tests on a complete vehicle.  

E-Print Network (OSTI)

??Vehicle manufacturers notice a difference between the tyre behaviour observed in road tests with a complete vehicle and the behaviour of the tyre as provided… (more)

Lo Conte, D.

2010-01-01T23:59:59.000Z

347

Canastota Renewable Energy Facility Project  

SciTech Connect

The project was implemented at the Madison County Landfill located in the Town of Lincoln, Madison County, New York. Madison County has owned and operated the solid waste and recycling facilities at the Buyea Road site since 1974. At the onset of the project, the County owned and operated facilities there to include three separate landfills, a residential solid waste disposal and recycled material drop-off facility, a recycling facility and associated administrative, support and environmental control facilities. This putrescible waste undergoes anaerobic decomposition within the waste mass and generates landfill gas, which is approximately 50% methane. In order to recover this gas, the landfill was equipped with gas collection systems on both the east and west sides of Buyea Road which bring the gas to a central point for destruction. In order to derive a beneficial use from the collected landfill gases, the County decided to issue a Request for Proposals (RFP) for the future use of the generated gas.

Blake, Jillian; Hunt, Allen

2013-12-13T23:59:59.000Z

348

Building Energy Software Tools Directory: Maintenance Edge  

NLE Websites -- All DOE Office Websites (Extended Search)

Maintenance Edge Maintenance Edge Maintenance Edge logo Maintenance Edge is a suite of online Software as a Service (SaaS) facility management tools that gives control and management over buildings without a capital investment. Maintenance Edge enables you to combine work order, planned maintenance, work order wireless, and critical alarms with the option of adding inventory. Fully implemented, Maintenance Edge will cut labor time, increase energy efficiencies, save on capital expenditures, and save on budget and management time. Features include: easy/user-friendly work order requesting, unlimited users, seven different user roles (limits data users can see), no capital or hardware costs required, access to data anywhere anytime, easy-to-click reporting on all the data in your system,

349

Long-Term Surveillance and Maintenance Program  

Office of Legacy Management (LM)

Office Grand Junction Office 2597 B 314 Road Grand Junction, Colorado 81503 Under DOE Contract No. DE-AC13-96GJ87335 Contents 1.0Introduction ......

350

Early Cook County Roads -- Part One  

NLE Websites -- All DOE Office Websites (Extended Search)

One One Nature Bulletin No. 738 January 11, 1964 Forest Preserve District of Cook County Seymour Simon, President Roberts Mann, Conservation Editor EARLY COOK COUNTY ROADS -- PARK ONE When Chicago was incorporated as a village in 1833 it was only a squalid hamlet of about 350 inhabitants and appeared to be so poorly situated that it was hopeless -- "crude cabins and flimsy shacks in a chaos of mud, rubbish and confusion. " Only a few feet above the level of Lake Michigan, the place was almost entirely surrounded by swamps and miles and miles of prairies that became nearly impassable after spring thaws and during periods of heavy rainfall. There were only two important routes that afforded access at all times. One was the Green Bay Trail, ancestor of North Clark St. in Chicago, Ridge Ave. in Evanston, and Green Bay Road north of that. The other, traveled by the soldiers coming from Detroit to build Fort Dearborn in 1803, used the Great Sauk Trail to La Porte, Indiana, then a trail northwesterly to what is now Michigan City, and the firm sands of the lake beach the rest of the way.

351

Project 272  

NLE Websites -- All DOE Office Websites (Extended Search)

Mill Road Pittsburgh, PA 15236 412-386-6175 john.mcdowell@netl.doe.gov DEVELOPING A COMBUSTION FLUE GAS MONITOR BASED ON SEMI-CONDUCTING METAL OXIDE SENSOR TECHNOLOGY...

352

Project 326  

NLE Websites -- All DOE Office Websites (Extended Search)

Pittsburgh, PA 15236 412-386-4499 gary.stiegel@netl.doe.gov John Winslow Hydrogen & Syngas Technology Manager National Energy Technology Laboratory 626 Cochrans Mill Road P.O....

353

Institutional perspectives on road pricing : essays on implementation, response, and adaptation  

E-Print Network (OSTI)

Road pricing involves charging road users a fee for the external social costs of using private vehicles. These costs typically remain unaccounted for in routine road transport operations and benefit-cost analyses. They ...

Mahendra, Anjali, 1977-

2008-01-01T23:59:59.000Z

354

METRo: A New Model for Road-Condition Forecasting in Canada  

Science Conference Proceedings (OSTI)

A numerical model to forecast road conditions, Model of the Environment and Temperature of Roads (METRo), has been developed to run at Canadian weather centers. METRo uses roadside observations from road weather information systems stations as ...

Louis-Philippe Crevier; Yves Delage

2001-11-01T23:59:59.000Z

355

Exact Routing in Large Road Networks Using Contraction Hierarchies  

Science Conference Proceedings (OSTI)

Contraction hierarchies are a simple approach for fast routing in road networks. Our algorithm calculates exact shortest paths and handles road networks of whole continents. During a preprocessing step, we exploit the inherent hierarchical structure ... Keywords: algorithm engineering, route planning, shortest paths

Robert Geisberger; Peter Sanders; Dominik Schultes; Christian Vetter

2012-08-01T23:59:59.000Z

356

Effective map-matching on the most simplified road network  

Science Conference Proceedings (OSTI)

The effectiveness of map-matching algorithms highly depends on the accuracy and correctness of underlying road networks. In practice, the storage capacity of certain hardware, e.g. mobile devices and embedded systems, is sometimes insufficient to maintain ... Keywords: GPS, map-matching, simplified road network

Kuien Liu; Yaguang Li; Fengcheng He; Jiajie Xu; Zhiming Ding

2012-11-01T23:59:59.000Z

357

A Numerical Model for Prediction of Road Temperature and Ice  

Science Conference Proceedings (OSTI)

A numerical model for the prediction of road temperature and ice has been tested on data from a Danish road station. The model is based on the solution of the equation of heat conduction in the ground and the surface energy-balance equation.

Bent H. Sass

1992-12-01T23:59:59.000Z

358

13th Annual Transportation Engineering and Road Research Alliance (TERRA)  

E-Print Network (OSTI)

13th Annual Sponsor: Transportation Engineering and Road Research Alliance (TERRA) Cosponsors: Minnesota Department of Transportation (Mn/DOT) Minnesota Local Technical Assistance Program (LTAP Association State Aid for Local Transportation, Mn/DOT Minnesota Local Road Research Board (LRRB) Pavement

Minnesota, University of

359

Climate policies for road transport revisited (I): Evaluation of the  

Open Energy Info (EERE)

Climate policies for road transport revisited (I): Evaluation of the Climate policies for road transport revisited (I): Evaluation of the current framework Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Climate policies for road transport revisited (I): Evaluation of the current framework Agency/Company /Organization: Elsevier Complexity/Ease of Use: Not Available Website: www.pik-potsdam.de/members/edenh/publications-1/CPFRTRI.pdf Related Tools Alternative Fuels and Advanced Vehicles Data Center - Codes and Standards Resources Reducing Congestion through Smart Parking Management Performance Measurement in the Road Sector: A Cross-Country Review of Experience ... further results Find Another Tool FIND TRANSPORTATION TOOLS This paper evaluates the effectiveness and efficiency of current climate policies for road transport that (1) target fuel producers and/or car

360

Carbon Capture and Storage Road Map | Open Energy Information  

Open Energy Info (EERE)

and Storage Road Map and Storage Road Map Jump to: navigation, search Name Carbon Capture and Storage Road Map Agency/Company /Organization Asian Development Bank Sector Energy Focus Area Renewable Energy, Economic Development, Greenhouse Gas, Industry Topics Adaptation, Implementation, Low emission development planning, -LEDS Website http://www.adb.org/news/adb-he Country China Eastern Asia References ADB Helps People's Republic of China Plan Carbon Capture and Storage Road Map[1] Program Overview "The Asian Development Bank (ADB) is assisting the People's Republic of China (PRC) in the development of a road map for carbon capture and storage (CCS) to help achieve the country's carbon dioxide (CO2) emissions reduction goals. ADB will assist the PRC in developing a detailed plan for a staged

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Geothermal Data Development, Collection, and Maintenance | Open Energy  

Open Energy Info (EERE)

Page Page Edit History Facebook icon Twitter icon » Geothermal Data Development, Collection, and Maintenance Jump to: navigation, search Geothermal ARRA Funded Projects for Geothermal Data Development, Collection, and Maintenance Loading map... {"format":"googlemaps3","type":"ROADMAP","types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"limit":200,"offset":0,"link":"all","sort":[""],"order":[],"headers":"show","mainlabel":"","intro":"","outro":"","searchlabel":"\u2026 further results","default":"","geoservice":"google","zoom":false,"width":"600px","height":"350px","centre":false,"layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","icon":"","visitedicon":"","forceshow":true,"showtitle":true,"hidenamespace":false,"template":false,"title":"","label":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"locations":[{"text":"

362

Project Title: DOE Code: Project Lead: NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Code: DOE Code: Project Lead: NEPA COMPLIANCE SURVEY # 258 Project lnfonnation Rewire electrical to pole at 77SHX10 Mike Preston Date: 11-19-09 Contractor Code: Project Overview No~ rea has been previously disturbed. The trenching will be th,ugh pre-existing right of way for the 1. What are the environmental ~ ~=~d ~ impacts? 2. What is the legal location? Repair a~ replacement of electrical lines to the Pole next to well at 77S~1 0. This will require trenching 3. What is the duration of the project? across the road a~ to the pole. Removing old lines and replacement of lines. 4. What major equipment will be used if any (wor1< over rig, drilling rig, 1 day etc.)? Back hole The table below is to be completed by the Project Lead and reviewed by the Environmental Specialist and the DOE NEPA

363

Second Line of Defense: Electronic Maintenance Reports, Local Maintenance Provider User Guide, Rev. 3  

Science Conference Proceedings (OSTI)

The Electronic Maintenance Report forms allow Local Maintenance Providers (LMP) and other program staff to enter maintenance information into a simple and secure system. This document describes the features and information required to complete the Maintenance Report forms. It is expected that all Corrective Maintenance Reports from LMPs will be submitted electronically into the SLD Portal. As an exception (e.g., when access to the SLD Portal is unavailable), Maintenance Reports can be submitted via a secure Adobe PDF form available through the Sustainability Manager assigned to each country.

Leigh, Richard J.

2012-09-01T23:59:59.000Z

364

Cogeneration Project Analysis Update  

E-Print Network (OSTI)

Not long ago, to evaluate the feasibility of a cogeneration project, a simple economic analysis, that considered capital required, operations and maintenance savings, was sufficient. However, under present economic uncertainties (and highly competitive business environment) the situation has changed dramatically. It is now essential to do an in-depth evaluation to insure that very diverse and applicable factors are determined and properly evaluated. This paper will go beyond the "nuts and bolts" analysis of cogeneration economics. It will enumerate and discuss diverse factors, such as, but not limited to: Fuel Considerations, Heat System Analysis, Electric Power Considerations, Key Technical Project Considerations, and Economic Analysis.

Robinson, A. M.; Garcia, L. N.

1987-09-01T23:59:59.000Z

365

Predictive Maintenance Technologies | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Maintenance Technologies Maintenance Technologies Predictive Maintenance Technologies October 28, 2013 - 10:15am Addthis Several diagnostic technologies and best practices are available to assist Federal agencies with predictive maintenance programs. Chapter 6 of the FEMP O&M Best Practices Guide (PDF 721 KB) outlines these technologies in detail. The full guide is also available (PDF 3.3 MB). Predictive maintenance technologies include: Thermography: Infrared imaging is used to generate visual images that identify variations in the infrared radiance of object surfaces. This method can be used to detect system surface wear, leaks, or failures. Lubricant and Wear Particle Analysis (a.k.a. Oil Analysis): Detailed analysis is taken to determine needed maintenance based on lubrication

366

Notices Bldg., 901 Pilottown Road, Lewes, DE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 Federal Register 4 Federal Register / Vol. 77, No. 249 / Friday, December 28, 2012 / Notices Bldg., 901 Pilottown Road, Lewes, DE 19958. January 17, 2013: 7-9 p.m.; Ocean County Administration Building, 101 Hooper Avenue, Public Hearing Room #119, Toms River, NJ 08754. Special Accommodations The hearings are physically accessible to people with disabilities. Requests for sign language interpretation or other auxiliary aids should be directed to M. Jan Saunders at the Mid-Atlantic Council Office, (302) 526-5251, at least 5 days prior to the hearing date. Dated: December 21, 2012. Tracey L. Thompson, Acting Deputy Director, Office of Sustainable Fisheries, National Marine Fisheries Service. [FR Doc. 2012-31148 Filed 12-27-12; 8:45 am] BILLING CODE 3510-22-P COMMODITY FUTURES TRADING

367

Western Greenbrier Co-Production Demonstration Project  

NLE Websites -- All DOE Office Websites (Extended Search)

contacts contacts Brad tomer Director Office of Major Demonstrations National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507-0880 304-285-4692 brad.tomer@netl.doe.gov nelson Rekos Project Manager National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507-0880 304-285-4066 nelson.rekos@netl.doe.gov PaRtIcIPant Western Greenbrier Co-Generation, LLC Lewisburg, WV Western Greenbrier Co-ProduCtion demonstration ProjeCt (disContinued) Project Description The Western Greenbrier Co-Production (WGC) project will generate about 100 megawatts of electricity and commercial quantities of salable ash by-products by burning waste coal presently contained in numerous coal refuse dumps in the vicinity of the plant. These refuse dumps, created by coal cleaning operations over

368

Windshield Wilderness: Cars, Roads, and Nature in Washington’s National Parks  

E-Print Network (OSTI)

Review: Windshield Wilderness: Cars, Roads, and Nature inLouter. Windshield Wilderness: Cars, Roads, and Nature inpost-consumer waste. “Cars, not people, are the parks’

Anderson, Byron

2006-01-01T23:59:59.000Z

369

Condition-Based Maintenance Program Coordinator Guideline  

Science Conference Proceedings (OSTI)

Condition-based maintenance (CBM) is an important component of an effective plant equipment reliability (ER) program, and in support of plant activities and undertakings in this area, in 2011 EPRI and an industry Technical Advisory Group (TAG) collaborated to produce the Condition-Based Maintenance Guideline (EPRI product 1022957). That document, a revision of the earlier four-volume Predictive Maintenance Guidelines, clearly defines the CBM process and serves as a core resource on ...

2013-03-28T23:59:59.000Z

370

FACILITY MAINTENANCE MANAGEMENT QUALIFICATION STANDARD REFERENCE GUIDE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Facility Facility Maintenance Management Qualification Standard Reference Guide NOVEMBER 2009 Table of Contents i FIGURES...................................................................................................................................... iv TABLES........................................................................................................................................ iv ACRONYMS ................................................................................................................................. v PURPOSE...................................................................................................................................... 1 SCOPE ...........................................................................................................................................

371

Risk-averse periodic preventive maintenance optimization.  

E-Print Network (OSTI)

??We consider a class of periodic preventive maintenance (PM) optimization problems, for a single piece of equipment that deteriorates with time or use, and can… (more)

Singh, Inderjeet,1978-

2011-01-01T23:59:59.000Z

372

DSOM (Decision Support for Operations and Maintenance ...  

Summary. Operations and maintenance (O&M) can make or break a business - especially with today's rising energy costs. DSOM® (Decision Support for ...

373

Pacific Northwest National Laboratory Grounds Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Pacific Northwest National Laboratory (PNNL) operates an award-winning grounds maintenance program that comprises a comprehensive landscape and irrigation management program. The...

374

Federal Energy Management Program: Predictive Maintenance Technologies  

NLE Websites -- All DOE Office Websites (Extended Search)

Technologies to someone by E-mail Share Federal Energy Management Program: Predictive Maintenance Technologies on Facebook Tweet about Federal Energy Management Program: Predictive...

375

Operations and maintenance reports | ENERGY STAR  

NLE Websites -- All DOE Office Websites (Extended Search)

from an expert Take a comprehensive approach Operations and maintenance reports ENERGY STAR Building Upgrade Manual Install renewable energy systems Save water to save energy...

376

Empowering Operations and Maintenance through Wireless  

Science Conference Proceedings (OSTI)

Presentation Title, Empowering Operations and Maintenance through Wireless. Author(s), Neil Freeman, Soroush Amidi, David Fisk. On-Site Speaker (Planned)

377

maintenance. This research is relevant to opera-tions and maintenance challenges facing aging  

E-Print Network (OSTI)

maintenance. This research is relevant to opera- tions and maintenance challenges facing aging to make equipment last longer.Economic pressures to maintain aging fleets of commercial and military

378

Task network-based project dynamic scheduling and schedule coordination  

Science Conference Proceedings (OSTI)

The resource-constrained project scheduling problem (RCPSP) is an extensively explored area. The existing RCPSP solutions tend to focus on single project scheduling problems without practical supports to address complex constraints, dynamic environments, ... Keywords: Aircraft maintenance management, Dynamic scheduling, Multi-project scheduling, Resource-constrained project scheduling problem (RCPSP), Schedule coordination

Qi Hao; Weiming Shen; Yunjiao Xue; Shuying Wang

2010-11-01T23:59:59.000Z

379

COMMUNITY CHOICE AGGREGATION PILOT PROJECT  

E-Print Network (OSTI)

costs for operation, maintenance, repair, rehabilitation, and replacement of the recommended project Estuary, New Jersey, Liberty State Park estimated average annual cost of the recommended plan is $2 or evaluation of historic properties; the costs of any mitigation activities or actions for historic properties

380

Nuclear Maintenance Applications Center: The Flowserve and Sulzer Reactor Coolant Pump Seal Maintenance Guide  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) report Main Coolant Pump Seal Maintenance Guide (TR-100855) was published in 1993. That report provided guidance on maintenance and troubleshooting of main coolant pump seals, but it was genericthe information was relevant to both PWRs and BWRs. By providing more current information, this report replaces the EPRI report Main Coolant Pump Seal Maintenance Guide.

2011-03-28T23:59:59.000Z

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Nuclear Maintenance Applications Center: Vertical Pump Maintenance Guide -- Update to EPRI Report 1003467  

Science Conference Proceedings (OSTI)

Results from several annual Electric Power Research Institute (EPRI) Nuclear Maintenance Applications Center (NMAC) maintenance issues surveys indicate that members are experiencing difficulties with various maintenance issues associated with vertical pumps. Some of the problems identified a need for information and assistance with pump and motor ...

2012-10-15T23:59:59.000Z

382

Generation Maintenance Application Center: Combustion Turbine Combined-Cycle Heat Recovery Steam Generator Maintenance Guide  

Science Conference Proceedings (OSTI)

This guide provides information to assist personnel involved with the maintenance of the heat recovery steam generator at a combustion gas turbine combined cycle facility, including good maintenance practices, preventive maintenance techniques and troubleshooting guidance. BackgroundCombustion turbine combined cycle (CTCC) facilities utilize various components that can be unique to this particular type of power plant. As such, owners and ...

2013-05-15T23:59:59.000Z

383

ITTF-016 Website Development-Maintenance Log 09_0909 EOTA - Business Form  

NLE Websites -- All DOE Office Websites (Extended Search)

6 Website Development-Maintenance Log 09_0909 6 Website Development-Maintenance Log 09_0909 EOTA - Business Form Document Title: ITTP-015 Web Site Development / Maintenance Document Number: Website Development and Maintenance log ITT Melissa Otero N/A Referenced Documents: Parent Document: ITTF-016 Rev. 11_0419 Approvers: Melissa Otero Document Owner: Ben Aragon Backup Owner: Notify of Changes: A B 08_0818 Revision History: Rev. Description of Change Intitial Release. Added headings to address to include: Performance Requirements, Statutory and Regulatory Requirements, Information from Previous Similar Designs, and Other Requirements. Added additional column to indicate "Estimated Completion Date" of WSD projects. "Design Verification Complete" and "Design Validation Complete" columns removed from log.

384

Information Technology for Energy and Maintenance Management  

E-Print Network (OSTI)

We describe the design of a tenant interface for energy and maintenance systems (TIEMS) in commercial buildings. TIEMS is designed for use by occupants (tenants) of commercial buildings. Our hypothesis is that by allowing tenants access to information from the energy and maintenance systems and by giving them some control over these systems, energy and maintenance performance can be improved. We used interviews with potential users and existing energy and maintenance databases to guide the design. Results of a field trial demonstrate the utility of TIEMS. We also describe the design of a maintenance and operations recommender (MORE). MORE uses information from computerized maintenance management systems (CMMS) and energy management and control systems (EMCS) to recommend what maintenance personnel should do in response to a maintenance service request. MORE integrates text descriptions of problems with sensor information related to the problem. After work orders are closed, MORE uses the information about what was actually done to solve the problem to learn how to improve its recommendations.

Villafana, L.; Federspiel, C.

2003-01-01T23:59:59.000Z

385

Protective Relay Maintenance and Application Guide  

Science Conference Proceedings (OSTI)

Protective relays are decision-making elements in the protection scheme for electrical power systems. A strong test and maintenance program will keep protective relays in a high state of readiness and help utilities avoid equipment damage and prolonged downtime. This guide provides recommended practices for maintenance and testing of these relays.

1993-10-02T23:59:59.000Z

386

Value-Based Operations and Maintenance Practices  

Science Conference Proceedings (OSTI)

Utilities can maximize the net corporate value of their operating and maintenance practices through a systematic approach that employs decision analysis techniques and marginal-value analysis. In a case study that confirmed the merit of the value-based approach, Duke Power Company developed and tested decision trees for specific predictive maintenance scenarios.

1995-04-14T23:59:59.000Z

387

Power Supply Maintenance and Application Guide  

Science Conference Proceedings (OSTI)

Instrument power supplies are very reliable; however, there is limited information that ties together operating history, maintenance practices, and data associated with repairing versus replacing power supplies. Also, the issue of equipment obsolescence affects many of the considerations associated with making power supply maintenance decisions.

2001-12-21T23:59:59.000Z

388

Void Fraction Instrument operation and maintenance manual  

SciTech Connect

This Operations and Maintenance Manual (O&MM) addresses riser installation, equipment and personnel hazards, operating instructions, calibration, maintenance, removal, and other pertinent information necessary to safely operate and store the Void Fraction Instrument. Final decontamination and decommissioning of the Void Fraction Instrument are not covered in this document.

Borgonovi, G.; Stokes, T.I.; Pearce, K.L.; Martin, J.D.; Gimera, M.; Graves, D.B.

1994-09-01T23:59:59.000Z

389

Operation and Maintenance Guidelines for Draft Fans  

Science Conference Proceedings (OSTI)

The reliability, efficiency, and safety of draft fans in fossil fuel power plants depend on effective operating and maintenance practices. These guidelines systematically present state-of-the-art techniques that utility personnel can use in operation, maintenance, troubleshooting, inspection, and weld repair of major fan components and auxiliary systems.

1999-05-13T23:59:59.000Z

390

Cathodic Protection System Application and Maintenance Guide  

Science Conference Proceedings (OSTI)

Typically, cathodic protection system equipment includes rectifiers, anodes, anode junction boxes, reference cells (electrodes), and test stations. The scope of this guide includes addressing the maintenance and testing of the system, its components, and providing appropriate recommendations. These recommendations will provide the basis for a suitable preventive (PM) and predictive (PdM) maintenance program.

2005-12-23T23:59:59.000Z

391

Operations and Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Areas » Operations and Maintenance Program Areas » Operations and Maintenance Operations and Maintenance October 4, 2013 - 5:07pm Addthis Federal facilities rely on pumps, motors, fans, and other mechanical systems for everyday operations. These systems must be maintained and operated correctly to reach their full potential. Well-executed operations and maintenance (O&M) programs promote energy efficiency and life cycle performance and can save Federal agencies 5% to 20% on annual energy bills without significant capital investments. Learn about: Federal Requirements: Look up O&M-related requirements that Federal agencies must meet as outlined by law and executive order Management Process: Learn about the operations and maintenance management process Commissioning: Get an overview of commissioning processes

392

NEPA COMPLIANCE SURVEY Project Information Project Title: Casing Drilling Test  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Casing Drilling Test Casing Drilling Test Date: 5-17-201 1 DOE Code: 6730-020-72000 Contractor Code: 8067-806 Project Lead: Marl< Duletsky Project Overview 1, Brief project description ~nclude The existing 13-1-SX-23 location and entry road will be reworlproject 4. Major equipment to be used

393

Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.  

SciTech Connect

Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM&R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA`s power system. This document -- the 1992 OM&R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction`s critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA`s ability to accomplish its OM&R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

394

Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.  

SciTech Connect

Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA's power system. This document -- the 1992 OM R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction's critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA's ability to accomplish its OM R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

395

Federal Energy Management Program: Operations and Maintenance Contacts  

NLE Websites -- All DOE Office Websites (Extended Search)

Contacts to someone by E-mail Contacts to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Contacts on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Contacts on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Contacts on Google Bookmark Federal Energy Management Program: Operations and Maintenance Contacts on Delicious Rank Federal Energy Management Program: Operations and Maintenance Contacts on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Contacts on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types

396

Federal Energy Management Program: Reliability-Centered Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Reliability-Centered Maintenance to someone by E-mail Share Federal Energy Management Program: Reliability-Centered Maintenance on Facebook Tweet about Federal Energy Management Program: Reliability-Centered Maintenance on Twitter Bookmark Federal Energy Management Program: Reliability-Centered Maintenance on Google Bookmark Federal Energy Management Program: Reliability-Centered Maintenance on Delicious Rank Federal Energy Management Program: Reliability-Centered Maintenance on Digg Find More places to share Federal Energy Management Program: Reliability-Centered Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems

397

The impact of maintenance and rehabilitation strategies on the pavement network value  

E-Print Network (OSTI)

The maintenance and rehabilitation of road infrastructure demands a great investment of time and money. The deterioration of pavement condition over time due to environmental factors and increasing traffic loads combined with the limitation of funds available for maintenance and rehabilitation creates a complex problem faced during the fund allocation process. Combinations of alternate funding levels and pavement management policies create different impacts on the network condition and future funding needs. The impacts of such decisions are one of the main concerns at strategic management levels where decisions about pavement maintenance and rehabilitation policies and funding levels are made. Pavement management systems have been used since about 1970 to assist in selecting candidate sections for treatment and identifying cost-effective treatments. Some engineering and economic models compare different maintenance and rehabilitation alternatives considering user costs, including vehicle operating costs, time of travel, and frequency of accidents; as well as agency costs, including maintenance and rehabilitation costs. User benefits are calculated by subtracting the user costs for a given strategy from the user costs from a do nothing strategy. However, these benefits do not necessarily translate into funds available to the agency. An asset management approach to assess the impact of pavement maintenance and rehabilitation scenarios on the pavement network value is presented in this research, and a case study is developed to evaluate the applicability of the method. This approach considers the effects of pavement maintenance and rehabilitation scenarios on the pavement network value in terms of the agency costs needed to recover the value of the asset. Methods for the quantifying the pavement network value over time, estimating agency costs, and analyzing the results are discussed. Results from a case study indicate that the method is able to assess the impact of pavement maintenance and rehabilitation strategies. This approach shows that there is an increase in the agency costs when treatments are delayed due to budget constraints or ineffective agency policies. Guidelines to report the impact of pavement management strategies are also outlined.

Chang Albitres, Carlos Martin

1999-01-01T23:59:59.000Z

398

Burner Management System Maintenance Guide for Fossil Power Plant Personnel  

Science Conference Proceedings (OSTI)

Burner Management System Maintenance Guide for Fossil Power Plant Personnel provides fossil plant maintenance personnel with current maintenance information on this system. This report will assist plant maintenance personnel in improving the reliability of and reducing the maintenance costs associated with the burner management system.

2008-03-25T23:59:59.000Z

399

Flue Gas Desulfurization Scrubber Maintenance Guide: Gypsum Dewatering Area  

Science Conference Proceedings (OSTI)

Flue Gas Desulfurization Scrubber Maintenance Guide: Gypsum Dewatering Area provides fossil plant maintenance personnel with current maintenance information on this system. This report will assist the plant maintenance personnel in improving the reliability and reducing the maintenance costs for this area of their scrubber system.

2009-12-08T23:59:59.000Z

400

Nuclear Maintenance Applications Center: Compression Fitting Application Manual  

Science Conference Proceedings (OSTI)

The Nuclear Maintenance Applications Center: Compression Fitting Application Manual provides power plant maintenance personnel with current maintenance information on this type of component used in power plants, both fossil fuel and nuclear. This guide will assist plant maintenance personnel in improving the reliability of and reducing the maintenance costs for this equipment.

2008-12-22T23:59:59.000Z

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Review: A review of surface erosion and sediment delivery models for unsealed roads  

Science Conference Proceedings (OSTI)

This paper reviews available models for estimating surface erosion and sediment delivery to streams from unsealed roads. It summarises current progress and identifies directions for ongoing research and model development. The paper provides a framework ... Keywords: Modelling, Road drainage, Road erosion, Sediment, Sediment delivery, Unsealed road

Baihua Fu; Lachlan T. H. Newham; C. E. Ramos-Scharrón

2010-01-01T23:59:59.000Z

402

Dillard Road Solar Power Facility | Open Energy Information  

Open Energy Info (EERE)

Dillard Road Solar Power Facility Dillard Road Solar Power Facility Jump to: navigation, search Name Dillard Road Solar Power Facility Facility Dillard Road Solar Power Facility Sector Solar Facility Type Photovoltaics Facility Status In Service Developer Recurrent Energy Energy Purchaser Sacramento Municipal Utility District Location Elk Grove, California Coordinates 38.465275°, -121.17847° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.465275,"lon":-121.17847,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

403

End of the road for Roadrunner | National Nuclear Security Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

End of the road for Roadrunner | National Nuclear Security Administration End of the road for Roadrunner | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > End of the road for Roadrunner End of the road for Roadrunner Posted By Office of Public Affairs This weekend, Roadrunner, the World's Fastest Supercomputer from 2008, will be switched off but not be forgotten.

404

One Woman's Road to Recovery | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

One Woman's Road to Recovery One Woman's Road to Recovery One Woman's Road to Recovery October 19, 2010 - 6:04pm Addthis One Woman's Road to Recovery Jo Napolitano Media Specialist, Argonne National Laboratory Editor's Note: Cross-posted from Argonne National Lab's Portraits of ARRA. Rebecca Bivens, who worked for a major oil company for seven years before she was laid off in January 2008, was elated to land a job that summer at one of the world's largest equipment manufacturers. That is, until the company laid off her entire division the night before Christmas Eve. "No one saw it coming," said Bivens, who spent years working in safety and procurement. "Just the month before, they said we were doing great. After losing two jobs in a year, it was pretty depressing. It was scary."

405

End of the road for Roadrunner | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

End of the road for Roadrunner | National Nuclear Security Administration End of the road for Roadrunner | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > End of the road for Roadrunner End of the road for Roadrunner Posted By Office of Public Affairs This weekend, Roadrunner, the World's Fastest Supercomputer from 2008, will be switched off but not be forgotten.

406

Marsh Road Power Plant Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Marsh Road Power Plant Biomass Facility Marsh Road Power Plant Biomass Facility Jump to: navigation, search Name Marsh Road Power Plant Biomass Facility Facility Marsh Road Power Plant Sector Biomass Facility Type Landfill Gas Location San Mateo County, California Coordinates 37.4337342°, -122.4014193° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.4337342,"lon":-122.4014193,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

407

One Woman's Road to Recovery | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

One Woman's Road to Recovery One Woman's Road to Recovery One Woman's Road to Recovery October 19, 2010 - 6:04pm Addthis One Woman's Road to Recovery Jo Napolitano Media Specialist, Argonne National Laboratory Editor's Note: Cross-posted from Argonne National Lab's Portraits of ARRA. Rebecca Bivens, who worked for a major oil company for seven years before she was laid off in January 2008, was elated to land a job that summer at one of the world's largest equipment manufacturers. That is, until the company laid off her entire division the night before Christmas Eve. "No one saw it coming," said Bivens, who spent years working in safety and procurement. "Just the month before, they said we were doing great. After losing two jobs in a year, it was pretty depressing. It was scary."

408

Candidate sets for alternative routes in road networks  

Science Conference Proceedings (OSTI)

We present a fast algorithm with preprocessing for computing multiple good alternative routes in road networks. Our approach is based on single via node routing on top of Contraction Hierarchies and achieves superior quality and efficiency compared to ...

Dennis Luxen; Dennis Schieferdecker

2012-06-01T23:59:59.000Z

409

The Road Ahead for Light Duty Vehicle Fuel Demand  

Gasoline and Diesel Fuel Update (EIA)

Energy Information Administration Logo. If you need assistance viewing this page, please call (202) 586-8800 The Road Ahead for Light Duty Vehicle Fuel Demand Click here to start...

410

New priorities for old roads : re-thinking roadway preservation  

E-Print Network (OSTI)

Most of the roads built over the last century in the US were built assuming that efficient mobility for drivers was most important without considering impacts to the natural or built environment. Urban neighborhoods were ...

Sylvester, Kathleen R. (Kathleen Rynn)

2009-01-01T23:59:59.000Z

411

Valuation of the Indiana Toll Road and Chicago Skyway privatizations  

E-Print Network (OSTI)

This thesis analyzes the economics and financing of the recent purchases of the Indiana Toll Road and Chicago Skyway. Similar privatizations have been occurring around the world, but the economic motive for such transactions ...

Chaudary, Faiza A. (Faiza Arshad)

2010-01-01T23:59:59.000Z

412

On Road Fuel Economy Performance of Hybrid Electric Vehicles  

NLE Websites -- All DOE Office Websites (Extended Search)

Road Fuel Economy Performance of Hybrid Electric Vehicles Lee Slezak Office of FreedomCAR and Vehicle Technologies U.S. Department of Energy Jim Francfort Advanced Vehicle Testing...

413

U.S. Virgin Islands Energy Road Map: Analysis  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Road Map: Analysis Eric Lantz, Dan Olis, and Adam Warren Technical Report NRELTP-7A20-52360 September 2011 NREL is a national laboratory of the U.S. Department of Energy,...

414

State of roads : public works as research, India circa 1960  

E-Print Network (OSTI)

That the road is a symbol of the prowess of the nation-state seems tautological, a uni"ed phenomenon of political symbolism that manifests as an infrastructural network. When subjected to a close historical examination, ...

Khorakiwala, Ateya A

2009-01-01T23:59:59.000Z

415

Greenidge Multi-Pollutant Control Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Plant Improvement Power Plant Improvement Initiative (PPII) CONTACTS Brad Tomer Director Offi ce of Major Demonstrations National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507-0880 304-285-4692 brad.tomer@netl.doe.gov Wolfe Huber National Energy Technology Laboratory 626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236-0940 412-386-5747 wolfe.huber@netl.doe.gov PARTNER CONSOL Energy Inc. Pittsburgh, PA ADDITIONAL TEAM MEMBERS AES Greenidge, LLC Babcock Power Environmental, Inc. GREENIDGE MULTI-POLLUTANT CONTROL PROJECT Project Description This project demonstrated a selective non-catalytic reduction (SNCR)/in-duct selective catalytic reduction (SCR) hybrid in combination with low-NO X burners (LNBs) and a circulating fl uidized bed dry scrubber (CFBDS) system using recycled

416

Non-Road Electric Vehicle Emissions: Analysis and Recommendations  

Science Conference Proceedings (OSTI)

Energy security and quality of life in the United States and around the globe are dependent upon the reduction of air pollution, petroleum dependency, and developing a solution to global warming. Non-road transportation equipment offers an opportunity to support this quality of life objective with a reduction in emissions through electrification. Private sector initiatives and regulatory agencies have begun to focus on non-road vehicles and equipment. This emission source category, which was largely unre...

2003-08-18T23:59:59.000Z

417

Development of computer-aided maintenance resources planning (CAMRP): A case of multiple CNC machining centers  

Science Conference Proceedings (OSTI)

Total productive maintenance (TPM), total maintenance assurance, preventive maintenance, reliability-centered maintenance (RCM), and many other innovative approaches to maintenance problems all aim at enhancing the effectiveness of machines to ultimately ... Keywords: Maintenance, Resources planning, Theory of constraints

J. Ashayeri

2007-12-01T23:59:59.000Z

418

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Chart: project timeline - Project Milestones - Budget - Bibliography * Thank you 29 30 Organization Chart * Project team: Purdue University - Dr. Brenda B. Bowen: PI, student...

419

Africa's Transport Infrastructure Mainstreaming Maintenance and  

Open Energy Info (EERE)

Africa's Transport Infrastructure Mainstreaming Maintenance and Africa's Transport Infrastructure Mainstreaming Maintenance and Management Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Africa's Transport Infrastructure Mainstreaming Maintenance and Management Agency/Company /Organization: World Bank Complexity/Ease of Use: Not Available Website: www.infrastructureafrica.org/system/files/Africa%27s%20Transport%20Inf Transport Toolkit Region(s): Africa & Middle East Related Tools The BEST Experiences with Bioethanol Buses The Sourcebook on Sustainable Urban Transport Alternative Fuels and Advanced Vehicles Data Center ... further results Find Another Tool FIND TRANSPORTATION TOOLS Transport infrastructure is a key requirement for economic growth. In Africa today, networks are sparse, conditions poor, transit slow and

420

Maintenance scheduling for modular systems-models and algorithms  

E-Print Network (OSTI)

Maintenance scheduling is an integral part of many complex systems. For instance, without effective maintenance scheduling, the combined effects of preventative and corrective maintenance can have severe impacts on the ...

Zarybnisky, Eric J. (Eric Jack), 1979-

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

FINAL REPORT: PHASE FOUR HIGHWAY MAINTENANCE CONCEPT VEHICLE  

E-Print Network (OSTI)

the maintenance management system. Phase IV has two major strands, technical and financial. The outcome of Phase ................................................................................................................. 55 AMS-200 (Application Management System) Console innovation in highway maintenance management, maintenance operations practices, and research. CTRE provided

Beresnev, Igor

422

Information Management, Analytics & Optimization Services IMS System Maintenance Service Offering  

E-Print Network (OSTI)

Information Management, Analytics & Optimization Services IMS System Maintenance Service Offering The IMS System Maintenance Review offering is a special service offering from the IMS laboratory Technical Specialist group. Complex IMS systems require periodic maintenance, coupled with a specific testing process

423

Pulverizer Maintenance Guide, Volume 2: Babcock & Wilcox Roll Wheel Pulverizers  

Science Conference Proceedings (OSTI)

The "Pulverizer Maintenance Guide, Volume 2: B&W Roll Wheel™ Pulverizers" provides fossil plant personnel with current maintenance information on this specific mill design. This guide will assist a plant in improving the maintenance of their pulverizer mills.

2004-12-22T23:59:59.000Z

424

Risk Based Maintenance Optimization using Probabilistic Maintenance Quantification Models of Circuit Breaker  

E-Print Network (OSTI)

New maintenance techniques for circuit breakers are studied in this dissertation by proposing a probabilistic maintenance model and a new methodology to assess circuit breaker condition utilizing its control circuit data. A risk-based decision approach is proposed at system level making use of the proposed new methodology, for optimizing the maintenance schedules and allocation of resources. This dissertation is focused on developing optimal maintenance strategies for circuit breakers, both at component and system level. A probabilistic maintenance model is proposed using similar approach recently introduced for power transformers. Probabilistic models give better insight into the interplay among monitoring techniques, failure modes and maintenance techniques of the component. The model is based on the concept of representing the component life time by several deterioration stages. Inspection and maintenance is introduced at each stage and model parameters are defined. A sensitivity analysis is carried to understand the importance of model parameters in obtaining optimal maintenance strategies. The analysis covers the effect of inspection rate calculated for each stage and its impact on failure probability, inspection cost, maintenance cost and failure cost. This maintenance model is best suited for long-term maintenance planning. All simulations are carried in MATLAB and how the analysis results may be used to achieve optimal maintenance schedules is discussed. A new methodology is proposed to convert data from the control circuit of a breaker into condition of the breaker by defining several performance indices for breaker assemblies. Control circuit signal timings are extracted and a probability distribution is fitted to each timing parameter. Performance indices for various assemblies such as, trip coil, close coil, auxiliary contacts etc. are defined based on the probability distributions. These indices are updated using Bayesian approach as the new data arrives. This process can be made practical by approximating the Bayesian approach calculating the indices on-line. The quantification of maintenance is achieved by computing the indices after a maintenance action and comparing with those of previously estimated ones. A risk-based decision approach to maintenance planning is proposed based on the new methodology developed for maintenance quantification. A list of events is identified for the test system under consideration, and event probability, event consequence, and hence the risk associated with each event is computed. Optimal maintenance decisions are taken based on the computed risk levels for each event. Two case studies are presented to evaluate the performance of the proposed new methodology for maintenance quantification. The risk-based decision approach is tested on IEEE Reliability Test System. All simulations are carried in MATLAB and the discussions of results are provided.

Natti, Satish

2008-12-01T23:59:59.000Z

425

Electricity for road transport, flexible power systems and wind...  

Open Energy Info (EERE)

blepowersystemsandwindpower(SmartGridProject)&oldid405681" Categories: Smart Grid Projects Smart Grid Projects in Europe Smart Grid Projects - Grid Automation Distribution...

426

An overview of time-based and condition-based maintenance in industrial application  

Science Conference Proceedings (OSTI)

This paper presents an overview of two maintenance techniques widely discussed in the literature: time-based maintenance (TBM) and condition-based maintenance (CBM). The paper discusses how the TBM and CBM techniques work toward maintenance decision ... Keywords: Condition-based maintenance, Industrial application, Maintenance decision making, Maintenance techniques, Preventive maintenance, Time-based maintenance

Rosmaini Ahmad; Shahrul Kamaruddin

2012-08-01T23:59:59.000Z

427

Federal Energy Management Program: Operations and Maintenance Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations and Operations and Maintenance Program Structure to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Program Structure on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Program Structure on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Program Structure on Google Bookmark Federal Energy Management Program: Operations and Maintenance Program Structure on Delicious Rank Federal Energy Management Program: Operations and Maintenance Program Structure on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Program Structure on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements

428

Federal Energy Management Program: Operations and Maintenance Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations and Operations and Maintenance Program Implementation to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Program Implementation on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Program Implementation on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Program Implementation on Google Bookmark Federal Energy Management Program: Operations and Maintenance Program Implementation on Delicious Rank Federal Energy Management Program: Operations and Maintenance Program Implementation on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Program Implementation on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance

429

Federal Energy Management Program: Resources on Operations and Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Resources on Resources on Operations and Maintenance to someone by E-mail Share Federal Energy Management Program: Resources on Operations and Maintenance on Facebook Tweet about Federal Energy Management Program: Resources on Operations and Maintenance on Twitter Bookmark Federal Energy Management Program: Resources on Operations and Maintenance on Google Bookmark Federal Energy Management Program: Resources on Operations and Maintenance on Delicious Rank Federal Energy Management Program: Resources on Operations and Maintenance on Digg Find More places to share Federal Energy Management Program: Resources on Operations and Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning

430

Requirements-Based Surveillance and Maintenance Review Guide...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Maintenance Review Guide Appendix A - Requirements-Based Surveillance and Maintenance Review Implementation Process, Process Flow Chart and the Flow Chart Footnotes...

431

Joint Maintenance Status Report of Potomac Electric Power Company...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Joint Maintenance Status Report of Potomac Electric Power Company amd PJM Interconnection, LLC Joint Maintenance Status Report of Potomac Electric Power Company amd PJM...

432

Attention to maintenance is key to longer battery life  

SciTech Connect

A unique way for battery maintenance on electric truck is described. This system is involved in multi-shift operation entailing battery changing, charging, and programed maintenance.

1975-08-01T23:59:59.000Z

433

Improve Operations & Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Improve Operations & Maintenance Improve Operations & Maintenance Improve Operations & Maintenance Photo of an equipment room in a high-rise commercial office building with red and green equipment. Every building's energy consumption can benefit from rigorous operations and maintenance (O&M) practices. Properly planned and executed O&M is one of the most cost-effective strategies for ensuring equipment longevity, reliability, safety, and energy efficiency in commercial buildings. By one estimate, O&M measures cost about 20 times less and achieve roughly the same energy savings as energy efficiency upgrades. There are various opportunities to improve efficiency through O&M that can be discovered through efforts such as engaging tenants, training building staff, and

434

Steam Turbine Hydraulic Control system Maintenance Guide  

Science Conference Proceedings (OSTI)

Steam turbine hydraulic control system maintenance problems have been a significant factor in plant power reductions, shutdowns, and lost generation. This guide provides recommendations to improve the reliability of the hydraulic components and fluid.

1996-12-31T23:59:59.000Z

435

An object oriented testing and maintenance environment  

Science Conference Proceedings (OSTI)

The object-oriented (OO) paradigm enjoys increasing acceptance in the software industry. Although the OO paradigm has visible benefits in the development cycle, testing and maintenance of OO programs have been considered challenging tasks by the research ...

David C. Kung; Jerry Gao; Pei Hsia

1994-10-01T23:59:59.000Z

436

Sound maintenance practices protect fan investments  

Science Conference Proceedings (OSTI)

Since underground coal miners depend on axial fans, lack of maintenance could prove costly. A number of pre-emptive actions that can help keep fans running at optimal performance can also be taken. 2 photos.

Bauer, M.

2009-11-15T23:59:59.000Z

437

Optimization Online - Optimizing Preventive Maintenance Models  

E-Print Network (OSTI)

Jun 29, 2004 ... Optimizing Preventive Maintenance Models ... It is assumed that there is a known model which predicts the frequency of system failure as a function of ... Category 2: Applications -- OR and Management Sciences (Scheduling ).

438

Maintenance implementation plan for fuel supply shutdown  

Science Conference Proceedings (OSTI)

This Maintenance Implementation Plan is written to satisfy the requirements of DOE Order 4330.4B, ``MAINTENANCE MANAGEMENT PROGRAM``, that specifies the general policy and objectives for the establishment of DOE controlled maintenance programs. These Programs provide for the management and performance of cost-effective maintenance and repair of Department of Energy (DOE) property, which includes facilities. A review of DOE Order 4330.4B, particularly Chapter II the nuclear portion, against existing WHC site programs and policies has provided assurance that most requirements of this order have already been implemented by existing WHC programs. Applicable requirements and guidelines of 4330.4B that are deficient or not implemented are presently being developed and implemented through WHC site policies and programs. Where no program is presently identified or being developed for 4330.4B requirements, responsibility for implementation has been assigned within this plan.

Stephenson, R.L.

1995-06-01T23:59:59.000Z

439

Federal Energy Management Program: Operations and Maintenance...  

NLE Websites -- All DOE Office Websites (Extended Search)

Program Management Effective management is critical to any operations and maintenance (O&M) program. The management function should bind the distinct parts of the O&M program into...

440

Fossil Maintenance Basis Optimization: Challenges and Strategies  

Science Conference Proceedings (OSTI)

This report covers many of the process challenges and strategies that were encountered and deployed during the implementation and execution of a preventive maintenance basis optimization (MBO) process at fossil generating stations. This MBO process was executed by several Electric Power Research Institutemember (EPRI-member) companies on a fleetwide basis as part of the members' plant reliability optimization (PRO) efforts. The PRO process covers many of the preventive maintenance (PM) programs at multip...

2010-05-27T23:59:59.000Z

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Solar Photovoltaic System Operations and Maintenance  

Science Conference Proceedings (OSTI)

Grid-connected flat plate solar photovoltaic (PV) systems are being deployed at an accelerating rate worldwide. Representing a growing absolute share of both independent power producer (IPP) and utility generation portfolios, these PV assets are now commanding a greater level of attention to ensure their optimal availability and performance. Contrary to popular belief, PV power plants are not maintenance free; in fact, they require a steady diet of scheduled preventive maintenance and unscheduled service...

2011-12-22T23:59:59.000Z

442

Performance Focused Maintenance for Distribution Substations  

Science Conference Proceedings (OSTI)

Performance Focused Maintenance (PFM) was introduced in 2005 as a generic concept to help maintenance managers cope with the competing objectives of maintaining service standards while containing costs. This report further develops the principles of PFM and integrates them into the larger power delivery asset management process. As the name implies, PFM focuses on performance and this report develops and demonstrates the steps required to establish proper performance measures and KPIs for PFM implementat...

2006-12-19T23:59:59.000Z

443

Nuclear Maintenance Applications Center: Generator Maintenance Guide for Emergency Diesel Generators (Japanese Version)  

Science Conference Proceedings (OSTI)

This report is a Japanese translation of Electric Power Research Institute (EPRI) Technical Report 1021479. EPRI developed this report to address maintenance and improve long-term reliability and availability of generators within nuclear power plant emergency diesel generator (EDG) systems. Maintenance of generator stators and rotors is the focus of this report, which highlights maintenance tasks and strategies that can be performed to identify generator degradation and prevent unforeseen failures. This ...

2012-03-21T23:59:59.000Z

444

Generation Maintenance Application Center: Fuel Gas System for Combustion Turbine Combined Cycle Plant Maintenance Guide  

Science Conference Proceedings (OSTI)

This guide provides information to assist personnel involved with the maintenance of the fuel gas system at a gas turbine combined cycle facility, including good maintenance practices, preventive maintenance techniques and troubleshooting guidance. BackgroundCombustion turbine combined cycle (CTCC) facilities utilize various components that can be unique to this particular type of power plant. As such, owners and operators of CTCC facilities may find ...

2013-05-15T23:59:59.000Z

445

Nuclear Maintenance Applications Center: Maintenance Engineering Fundamentals for Nuclear Utility Personnel - Student Handbook  

Science Conference Proceedings (OSTI)

This EPRI report is the student handbook for participants in a training course on maintenance engineering fundamentals for nuclear utility personnel. The training course was developed in conjunction with EPRI report 1015307, Nuclear Maintenance Applications Center: Maintenance Engineer Fundamentals Handbook. Among the materials in the student handbook are an overview of the entire course; lists of pertinent definitions, acronyms, and resource materials; summaries of learning objectives and key points for...

2008-12-22T23:59:59.000Z

446

Reduce Operating Costs with an EnergySmart School Project | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

School Project Reduce Operating Costs with an EnergySmart School Project EnergySmart Schools fact sheet on how school operations and maintenance (O&M) personnel can play a...

447

Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Vehicle Maintenance to Vehicle Maintenance to Conserve Fuel to someone by E-mail Share Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Facebook Tweet about Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Twitter Bookmark Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Google Bookmark Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Delicious Rank Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Digg Find More places to share Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on AddThis.com... More in this section... Idle Reduction Parts & Equipment Maintenance Driving Behavior Fleet Rightsizing System Efficiency Vehicle Maintenance to Conserve Fuel A comprehensive vehicle maintenance strategy can help fleet managers and

448

Project Ranking Method for Nuclear Power Plants: Prioritizing Proposed Capital and O&M Projects  

Science Conference Proceedings (OSTI)

As the electric power industry becomes more competitive, it becomes ever more important to invest limited budgets only in projects that increase or protect a plant's value and profitability over its remaining operating term. This report describes a robust method that plants can customize to evaluate, rank, and select their operating and maintenance (O&M) and capital projects.

2003-05-12T23:59:59.000Z

449

EC-Web Project Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Plan More Documents & Publications CITSS Project Plan Audit Report: AP-FS-97-02 Request for Information - Operations and Maintenance (O & M) Support Services for the iManage...

450

Y-12 Groundwater Protection Program Monitoring Well Inspection and Maintenance Plan  

Science Conference Proceedings (OSTI)

This document is the third revision of the 'Monitoring Well Inspection and Maintenance Plan' for groundwater wells associated with the US Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. This plan describes the systematic approach for: (1) inspecting the physical condition of monitoring wells at Y-12; (2) identifying maintenance needs that extend the life of the well and assure well-head protection is in place, and (3) identifying wells that no longer meet acceptable monitoring-well design or well construction standards and require plugging and abandonment. The inspection and maintenance of groundwater monitoring wells is one of the primary management strategies of the Y-12 Groundwater Protection Program (GWPP) Management Plan, 'proactive stewardship of the extensive monitoring well network at Y-12' (BWXT 2004a). Effective stewardship, and a program of routine inspections of the physical condition of each monitoring well, ensures that representative water-quality monitoring and hydrologic data are able to be obtained from the well network. In accordance with the Y-12 GWPP Monitoring Optimization Plan (MOP) for Groundwater Monitoring Wells at the Y-12 National Security Complex, Oak Ridge, Tennessee (BWXT 2006b), the status designation (active or inactive) for each well determines the scope and extent of well inspections and maintenance activities. This plan, in conjunction with the above document, formalizes the GWPP approach to focus available resources on monitoring wells which provide the most useful data. This plan applies to groundwater monitoring wells associated with Y-12 and related waste management facilities located within the three hydrogeologic regimes: (1) the Bear Creek Hydrogeologic Regime (Bear Creek Regime); (2) the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime); and (3) the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek Regime encompasses a section of the Bear Creek Valley (BCV) immediately west of Y-12. The East Fork Regime encompasses most of the Y-12 process, operations, and support facilities in BCV east of scarboro Road. The Chestnut Ridge Regime is directly south of Y-12 and encompasses a section of Chestnut Ridge that is bound to the west by a surface drainage feature (Dunaway Branch) and by Scarboro Road to the east. The GWPP maintains an extensive database of construction details and related information for the monitoring wells in each hydrogeologic regime in the 'Updated Subsurface Database for Bear Creek Valley, Chestnut Ridge, and parts of Bethel Valley on the US DOE Oak Ridge Reservation (BWXT 2003a). A detailed description of the hydrogeologic framework at Y-12 can be found in the GWPP Management Plan (BWXT 2004a).

None

2006-12-01T23:59:59.000Z

451

INFOGRAPHIC: The Road to Fuel Efficiency | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Road to Fuel Efficiency The Road to Fuel Efficiency INFOGRAPHIC: The Road to Fuel Efficiency November 27, 2012 - 11:01am Addthis This infographic takes a look at fuel economy standards and how recent improvements in these standards will benefit consumers and the U.S. economy. | Infographic by Sarah Gerrity. This infographic takes a look at fuel economy standards and how recent improvements in these standards will benefit consumers and the U.S. economy. | Infographic by Sarah Gerrity. Sarah Gerrity Sarah Gerrity Multimedia Editor, Office of Public Affairs The Obama Administration's new national fuel economy standards for passenger vehicles will improve vehicle efficiency and save Americans money at the pump, all while reducing our dependence on foreign oil and growing

452

Bruceville Road Solar Power Facility | Open Energy Information  

Open Energy Info (EERE)

Bruceville Road Solar Power Facility Bruceville Road Solar Power Facility Jump to: navigation, search Name Bruceville Road Solar Power Facility Facility Bruceville Solar Power Facility Sector Solar Facility Type Photovoltaics Facility Status In Service Developer Recurrent Energy Energy Purchaser Sacramento Municipal Utility District Location Elk Grove, California Coordinates 38.347479°, -121.412498° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.347479,"lon":-121.412498,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

453

Eng. Opt., 2002, Vol. 34, pp. 561577 DESIGNING FOR MAINTENANCE  

E-Print Network (OSTI)

of a series of absorption chillers for an industrial complex. Keywords: Maintenance; Game theory; Decision

Seepersad, Carolyn Conner

454

Flue Gas Desulfurization Scrubber Maintenance Guide: Absorber Area  

Science Conference Proceedings (OSTI)

The Flue Gas Desulfurization Scrubber Maintenance Guide: Absorber Area provides fossil plant maintenance personnel with current maintenance information on this system and will help to improve the reliability of and reduce the maintenance costs for this area of their scrubber system.

2008-12-18T23:59:59.000Z

455

A condition-based maintenance policy for intelligent monitored system  

Science Conference Proceedings (OSTI)

This study proposes a sequential Condition-Based Maintenance (CBM) policy for intelligent monitored system based on cost and reliability prioritisation. It is assumed that system's reliability could be continuously monitored, whenever ... Keywords: CBM, condition-based maintenance, cost, intelligent monitoring, maintenance policy, optimisation, predictive maintenance, reliability, simulation

Wenzhu Liao; Ershun Pan; Lifeng Xi

2009-06-01T23:59:59.000Z

456

Fundamental Laws and Assumptions of Software Maintenance Adam A. Porter  

E-Print Network (OSTI)

environments. The longer a system stays in service, the larger maintenance costs are, and, therefore, it­oriented programming languages, software architectures and configuration management. Managing the maintenance process. Maintenance is costly and somewhat unpredictable. Thus, management tools for controlling maintenance

Porter, Adam

457

Flue Gas Desulfurization Scrubber Maintenance Guide: Reagent Preparation Area  

Science Conference Proceedings (OSTI)

The Flue Gas Desulfurization Scrubber Maintenance Guide: Reagent Preparation Area provides the fossil plant maintenance personnel with current maintenance information on this system and will help improve the reliability and reduce the maintenance costs for this area of their scrubber system.

2008-12-15T23:59:59.000Z

458

Categorical Exclusion Determinations: West Valley Demonstration Project |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Valley Demonstration Valley Demonstration Project Categorical Exclusion Determinations: West Valley Demonstration Project Categorical Exclusion Determinations issued by West Valley Demonstration Project. DOCUMENTS AVAILABLE FOR DOWNLOAD July 11, 2013 CX-010718: Categorical Exclusion Determination Replacement Ventilation System for the Main Plant Process Building CX(s) Applied: B6.3 Date: 07/11/2013 Location(s): New York Offices(s): West Valley Demonstration Project December 20, 2012 CX-009527: Categorical Exclusion Determination WVDP-2012-02 Routine Maintenance CX(s) Applied: B1.3 Date: 12/20/2012 Location(s): New York Offices(s): West Valley Demonstration Project August 2, 2012 CX-009528: Categorical Exclusion Determination WVDP-2012-01 WVDP Reservoir Interconnecting Canal Maintenance Activities

459

Microsoft Word - CX-AlveyMaintenanceHQ_PoleStorageUpgrade_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 SUBJECT: Environmental Clearance Memorandum Brett Sherer Project Manager - KEP-4 Proposed Action: Environmental protection system upgrades at pole storage facility at Alvey Maintenance Headquarters. Budget Information: Work Order #00283226 Categorical Exclusion Applied (Appendix B to Subpart D, 10 C.F.R. Part 1021): B4.6: Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area including, but not limited to, switchyard rock grounding upgrades, secondary containment projects, paving projects, seismic upgrading, tower modifications, changing insulators, and replacement of poles, circuit breakers, conductors, transformers, and crossarms.

460

Federal Energy Management Program: Operations and Maintenance Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Measurement to someone by E-mail Measurement to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Program Measurement on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Program Measurement on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Program Measurement on Google Bookmark Federal Energy Management Program: Operations and Maintenance Program Measurement on Delicious Rank Federal Energy Management Program: Operations and Maintenance Program Measurement on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Program Measurement on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Federal Energy Management Program: Operations and Maintenance Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Management Support to someone by E-mail Management Support to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Management Support on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Management Support on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Management Support on Google Bookmark Federal Energy Management Program: Operations and Maintenance Management Support on Delicious Rank Federal Energy Management Program: Operations and Maintenance Management Support on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Management Support on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management

462

Safety assured financial evaluation of maintenance  

E-Print Network (OSTI)

Management decisions in complex industrial facilities usually consider both the economic and environmental aspects of the plant's performance. For nuclear power plants (NPPs), safety is also a very substantial issue. The objectives of this dissertation are to develop and demonstrate a novel useful conceptual model that could be used to allocate maintenance funds for a nuclear power plant in such a way as to meet all specified safety requirements and objectives, while achieving a high degree of economic performance. The model is based on the general theory that the reliability of a plant at any time is a function of its initial reliability and the maintenance history of the individual plant components (Smith, 1997). Such a model can assist in evaluating strategic management decisions regarding allocation of funds for nuclear power plant maintenance. It could be used as a simulation tool; various scenarios could be studied to answer "what if" questions. Simulations of this type will allow a better understanding of the relationship between maintenance, economic performance, and safety, and consequently will lead to better decision making. The novelty of this model is tied to the intimate relationship that it develops between maintenance activities at a nuclear plant, and their relationship to prescribed safety requirements and to the economic performance of that plant.

Erguina, Vera

2005-05-01T23:59:59.000Z

463

Comparing maintenance costs of geothermal heat pump systems with other HVAC systems: Preventive maintenance actions and total maintenance costs  

SciTech Connect

Total annual heating, ventilating, and air-conditioning (HVAC) maintenance costs were determined for 20 schools in the Lincoln, Nebraska, Public School District. Each school examined provides cooling to over 70% of its total floor area and relies on one of the following heating and cooling systems to provide the majority of space conditioning: vertical-bore, geothermal heat pumps (GHPs), air-cooled chiller with gas-fired hot water boiler (ACC/GHWB), or water-cooled chiller with gas-fired steam boiler (WCC/GSB). A precursor to this study examined annual costs associated with repair, service, and corrective maintenance activities tracked in a work order database. This follow-up study examines costs associated with preventive maintenance (PM) activities conducted by the district. Annual PM costs were 5.87 {cents}/yr-ft{sup 2} (63.14 {cents}/yr-m{sup 2}) for ACC/GHWB schools, followed by 7.14 {cents}/yr-ft{sup 2} (76.86 {cents}/yr-m{sup 2}) for GHP, 9.82 {cents}/yr-ft{sup 2} (105.39 {cents}/yr-m{sup 2}) for WCC/ GSB, and 12.65 {cents}/yr-ft{sup 2} (136.30 {cents}/yr-m{sup 2}) for WCC/GHWB. The results of the two analyses are combined to produce an estimate of total annual maintenance costs, by system type, for the 20 schools. Total annual maintenance costs were 8.75 {cents}/yr-ft{sup 2} (94.20 {cents}/yr-m{sup 2}) for ACC/GHWB schools, followed by 9.27 {cents}/yr-ft{sup 2} (99.76 {cents}/yr-m{sup 2}) for GHP, 13.54 {cents}/yr-ft{sup 2} (145.49 {cents}/yr-m{sup 2}) for WCC/GSB, and 18.71 {cents}/yr-ft{sup 2} (201.61 {cents}/yr-m{sup 2}) for WCC/GHWB. It should be noted that these costs represent only the trends seen in the maintenance database of the Lincoln School District. Because of differences in the number of schools using each system type, varying equipment age, and the small total number of schools included in the study, the maintenance costs presented here may not be representative of the maintenance costs seen for similar equipment in other locations.

Martin, M.A.; Madgett, M.G.; Hughes, P.J.

2000-07-01T23:59:59.000Z

464

Road less traveled vital to operational success  

Science Conference Proceedings (OSTI)

PNNL's Monthly Economic Diversity column for the Tri-City Herald Business section. Excerpt follows: Things aren't always what they seem. Sometimes the path less traveled--although it can be exhausting if not scary to think about navigating its unknowns--really is the best way to go. And not just because Robert Frost said so. Patric Sazama, Regional Project Director for Impact Washington, would agree as well. He recently spoke to the Three Rivers Entrepreneur Network about achieving operational success by addressing the less tangible elements of an organization, the company's own less traveled path.

Madison, Alison L.

2012-01-08T23:59:59.000Z

465

Project Accounts  

NLE Websites -- All DOE Office Websites (Extended Search)

» Project Accounts » Project Accounts Project Accounts Overview Project accounts are designed to facilitate collaborative computing by allowing multiple users to use the same account. All actions performed by the project account are traceable back to the individual who used the project account to perform those actions via gsisshd accounting logs. Requesting a Project Account PI's, PI proxies and project managers are allowed to request a project account. In NIM do "Actions->Request a Project Account" and fill in the form. Select the repository that the Project Account is to use from the drop-down menu, "Sponsoring Repository". Enter the name you want for the account (8 characters maximum) and a description of what you will use the account for and then click on the "Request Project Account" button. You

466

Microsoft Word - CX-BigEddy-Redmond-ConductorMaintenance-FY13_WEB  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4, 2013 4, 2013 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Stacy Hensley Project Manager - TEP-CSB-2 Proposed Action: Conductor maintenance on Bonneville Power Administration's (BPA) Big Eddy-Redmond transmission line Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities Location: Approximately six miles southeast of The Dalles in Wasco County, Oregon. T1N, R14E, Sec 4, 5, 9, 20, 28, 29, and 33 Proposed by: BPA Description of the Proposed Action: BPA proposes to perform routine maintenance on the Big Eddy-Redmond, 230-kilovolt transmission line conductor. The proposed work includes re-sagging the transmission line, and replacing the transmission line hardware and transmission

467

POST-DEACTIVATION SURVEILLANCE AND MAINTENANCE PLANNING  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POST-DEACTIVATION SURVEILLANCE AND POST-DEACTIVATION SURVEILLANCE AND MAINTENANCE PLANNING Post-Deactivation Surveillance and Maintenance Planning Dependence of End-Points Planning on S&M Planning Primary Surveillance Concerns Typical Deactivation S&M Plan Contents Example of a Post-Deactivation S&M Plan Dependence of End-Points Planning on S&M Planning One of the key elements of end-point planning is knowing what the post-deactivation S&M activities will be so that conditions can be established to support them. The post-deactivation S&M plan specifies the surveillance, inspection, and maintenance of the facility in the deactivated state. It should address the activities, the locations in which they will be conducted, and their frequency. Part of the S&M planning is

468

software maintenance in Distributed, EVOLVing Environments  

E-Print Network (OSTI)

Distributed applications in evolving environments are typically difficult to maintain. Currently, human intervention is needed to maintain the application and adapt it to its changed environment. We need to: deploy application software on the added devices (buses), replace application software on the changed devices (e.g. to support the new advertisement display), and remove application software when no longer useful (e.g. because it requires an advertisement display which is removed). When the distributed environment becomes too large, or changes too often, manual software maintenance is no longer a feasible option. Automation is required. This paper reports on our ongoing work on dEVOLVe, a new OSGi based middleware platform which will automate some software maintenance tasks in ’distributed evolving environments’. dEVOLVe will detect changes in the distributed environment and will adapt the application accordingly. This way, the user is free from software maintenance tasks caused by the environment evolution.

Bart Elen; Sam Michiels; Wouter Joosen; Pierre Verbaeten; Bart Elen; Sam Michiels; Wouter Joosen; Pierre Verbaeten

2008-01-01T23:59:59.000Z

469

Projects | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

and Conferences Supporting Organizations Supercomputing and Computation Home | Science & Discovery | Supercomputing and Computation | Projects Projects 1-10 of 180 Results Prev...

470

Project 244  

NLE Websites -- All DOE Office Websites (Extended Search)

PROJECT PARTNER Advanced Technology Systems, Inc. Pittsburgh, PA PROJECT PARTNERS Ohio University Athens, OH Texas A&M University-Kingsville Kingsville, TX WEBSITES http:...

471

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CCS August 20-22, 2013 2 Presentation Outline * Benefits to the program * Project overall objectives * Technical status * Project summary * Conclusions and future plans 3 Benefit...

472

Valve Application, Maintenance, and Repair Guide  

Science Conference Proceedings (OSTI)

The Valve Application, Maintenance, and Repair Guide is a two-volume series that provides a generic overview of valve application, selection, maintenance, and repair. Volume 1 of the series is a comprehensive reference on the application and use of valves that provides guidance on the selection of specific types of valves on the basis of functional and system requirements. This document is based on an earlier EPRI document (NP-6516, Guide for the Application and Use of Valves in Power Plant Systems). Ext...

1999-05-07T23:59:59.000Z

473

TRUPACT-II Container Maintenance Program Plan  

Science Conference Proceedings (OSTI)

This document details the maintenance, repair, and replacement of components, as well as the documentation required and the procedures to be followed to maintain the integrity of the TRUPACT-II container in accordance with OM-134, TRUPACT-II Container Operations and Maintenance Manual; and the TRUPACT-II Container Certificate of Compliance (Number 9218). The routine shipping and receiving inspections required by the Department of Transportation (DOT), Department of Energy (DOE), Nuclear Regulatory Commission (NRC) and other regulations are not addressed in this document. This document applies to all DOE shipping and receiving sites that use the TRUPACT-II containers.

Not Available

1991-05-01T23:59:59.000Z

474

ATLAS Maintenance and Operation management system  

E-Print Network (OSTI)

The maintenance and operation of the ATLAS detector will involve thousands of contributors from 170 physics institutes. Planning and coordinating the action of ATLAS members, ensuring their expertise is properly leveraged and that no parts of the detector are understaffed or overstaffed will be a challenging task. The ATLAS Maintenance and Operation application (referred to as Operation Task Planner inside the ATLAS experiment) offers a fluent web based interface that combines the flexibility and comfort of a desktop application, intuitive data visualization and navigation techniques, with a lightweight service oriented architecture. We will review the application, its usage within the ATLAS experiment, its underlying design and implementation.

Copy, B

2007-01-01T23:59:59.000Z

475

Oregon E.V. Road Map - Electric Drive Vehicle (PHEVs) Testing...  

NLE Websites -- All DOE Office Websites (Extended Search)

Oregon E.V. Road Map - Electric Drive Vehicle (PHEVs) Testing Activities and Results Jim Francfort E.V. Road Map - Preparing Oregon for the Introduction of Electric Vehicles...

476

Conceptual and Scaling Evaluation of Vehicle Traffic Thermal Effects on Snow/Ice-Covered Roads  

Science Conference Proceedings (OSTI)

The potential thermal effects of traffic on road surface thermal energy balance under frost/snow cover conditions have been largely ignored in meteorological evaluations of road ice deposit conditions. Preliminary exploration of these effects, ...

Joseph M. Prusa; Moti Segal; Bradley R. Temeyer; William A. Gallus Jr.; Eugene S. Takle

2002-12-01T23:59:59.000Z

477

Use of Coal Ash in Highway Construction: Michigan Demonstration Project  

Science Conference Proceedings (OSTI)

This report documents the construction and performance testing of a 3000-ft length of fly ash base under a highway shoulder. Following three years of service, the road shoulder shows no signs of premature deterioration. This report should aid utilities seeking to increase ash-use rates in highway-related projects, as well as state highway design engineers responsible for preparing construction specifications.

1991-03-05T23:59:59.000Z

478

Over-the-road shock and vibration testing of the radioisotope thermoelectric generator transportation system  

DOE Green Energy (OSTI)

Radioisotope Thermoelectric Generators (RTG) convert heat generated by radioactive decay into electricity through the use of thermocouples. The RTGs have a long operating life, are reasonably lightweight, and require little or no maintenance, which make them particularly attractive for use in spacecraft. However, because RTGs contain significant quantities of radioactive materials, normally plutonium-238 and its decay products, they must be transported in packages built in accordance with Title 10, Code of Federal Regulations, Part 71 (10 CFR 71). To meet these regulations, a RTG Transportation System (RTGTS) that fully complies with 10 CFR 71 has been developed, which protects RTGs from adverse environmental conditions during normal conditions of transport (e.g., shock, vibration, and heat). To ensure the protection of RTGs from shock and vibration loadings during transport, extensive over-the-road testing was conducted on the RTG`S to obtain real-time recordings of accelerations of the air-ride suspension system trailer floor, packaging, and support structure. This paper provides an overview of the RTG`S, a discussion of the shock and vibration testing, and a comparison of the test results to the specified shock response spectra and power spectral density acceleration criteria.

Becker, D.L.

1997-05-01T23:59:59.000Z

479

Technology status of hydrogen road vehicles. IEA technical report from the IEA Agreement of the production and utilization of hydrogen  

DOE Green Energy (OSTI)

The report was commissioned under the Hydrogen Implementing Agreement of the International Energy Agency (IEA) and examines the state of the art in the evolving field of hydrogen-fueled vehicles for road transport. The first phase surveys and analyzes developments since 1989, when a comprehensive review was last published. The report emphasizes the following: problems, especially backfiring, with internal combustion engines (ICEs); operational safety; hydrogen handling and on-board storage; and ongoing demonstration projects. Hydrogen vehicles are receiving much attention, especially at the research and development level. However, there has been a steady move during the past 5 years toward integral demonstrations of operable vehicles intended for public roads. Because they emit few, or no greenhouse gases, hydrogen vehicles are beginning to be taken seriously as a promising solution to the problems of urban air quality. Since the time the first draft of the report was prepared (mid-19 96), the 11th World Hydrogen Energy Conference took place in Stuttgart, Germany. This biennial conference can be regarded as a valid updating of the state of the art; therefore, the 1996 results are included in the current version. Sections of the report include: hydrogen production and distribution to urban users; on-board storage and refilling; vehicle power units and drives, and four appendices titled: 'Safety questions of hydrogen storage and use in vehicles', 'Performance of hydrogen fuel in internal production engines for road vehicles, 'Fuel cells for hydrogen vehicles', and 'Summaries of papers on hydrogen vehicles'. (refs., tabs.)

Doyle, T.A.

1998-01-31T23:59:59.000Z

480

The Private Provision of Frontier Infrastructure: Toll Roads in California, 1850-1902  

E-Print Network (OSTI)

action. The impetus for taking stock was not dividends butimpetus for taking toll road stock. Voluntary association

Klein, Daniel B.; Yin, Chi

1994-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Operations & Maintenance Best Practices Guide: Release 3.0  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

O&M Best Practices Guide, Release 3.0 3.1 O&M Best Practices Guide, Release 3.0 3.1 Chapter 3 O&M Management 3.1 Introduction O&M management is a critical component of the overall program. The management function should bind the distinct parts of the program into a cohesive entity. From our experience, the overall program should contain five very distinct functions making up the organization: Operations, Maintenance, Engineering, Training, and Administration-OMETA. Beyond establishing and facilitating the OMETA links, O&M managers have the responsibility of interfacing with other department managers and making their case for ever-shrinking budgets. Their roles also include project implementation functions as well as the need to maintain persistence of the

482

Operations & Maintenance Best Practices Guide: Release 3.0  

NLE Websites -- All DOE Office Websites (Extended Search)

O&M Best Practices Guide, Release 3.0 3.1 O&M Best Practices Guide, Release 3.0 3.1 Chapter 3 O&M Management 3.1 Introduction O&M management is a critical component of the overall program. The management function should bind the distinct parts of the program into a cohesive entity. From our experience, the overall program should contain five very distinct functions making up the organization: Operations, Maintenance, Engineering, Training, and Administration-OMETA. Beyond establishing and facilitating the OMETA links, O&M managers have the responsibility of interfacing with other department managers and making their case for ever-shrinking budgets. Their roles also include project implementation functions as well as the need to maintain persistence of the

483

Maintenance and operation of the USDOE Alternative Fuel Center  

DOE Green Energy (OSTI)

The Alternative Fuels Utilization Program (AFUP) of the Office of Energy Efficiency and Renewable Energy has investigated the possibilities and limitations of expanded scope of fuel alternatives and replacement means for transportation fuels from alternative sources. Under the AFUP, the Alternative Fuel Center (AFC) was created to solve problems in the DOE programs that were grappling with the utilization of shale oil and coal liquids for transportation fuels. In year one of this contract, a timeline was set to coordinate uses and operations of the AFC hydrogenation pilot plant among test fuels production project work, facility maintenance, other government work, and work for industry for second-generation operations. In year two, consistent with assisting the AFUP in accomplishing its general goals, the work was done with fuel producers, regulators, and users in mind. AFC capabilities and results were disseminated through tours and outside presentations.

Erwin, J.; Moulton, D.S.; Hetrick, D.L. [Southwest Research Inst., San Antonio, TX (United States)] [Southwest Research Inst., San Antonio, TX (United States)

1994-08-01T23:59:59.000Z

484

Putting Electricity Where The Rubber Meets the Road [NEWS  

Science Conference Proceedings (OSTI)

In-wheel motors can improve fuel economy and safety for hybrid electric vehicles. A motor housed inside a wheel hub can shunt up to 96 percent of the torque it generates directly to the patch of tire that touches the road. With a conventional drivetrain, ...

W. D. Jones

2007-07-01T23:59:59.000Z

485

Remote Sensing Messungen zur on-road Bestimmung der  

E-Print Network (OSTI)

LUBETRAX Remote Sensing Messungen zur on-road Bestimmung der Abgase von schweren Motorfahrzeugen, Chur, Zürich, Brugg Dr. Peter Maly (Projektleitung) Dr. Stefan Scherer Dr. G.A. Bishop (Remote Sensing;Inhaltsverzeichnis Zusammenfassung 1 1. Einleitung und Zielsetzung 3 1.1 Remote Sensing Messungen (FEAT) 4 1

Denver, University of

486

Harmful Exhaust Emissions Monitoring of Road Vehicle Engine  

Science Conference Proceedings (OSTI)

Road vehicle improve the quality of people's life, however harmful vehicle exhaust emissions, such as carbon monoxide (CO), nitric oxide (NO), nitrogen dioxide (NO2), hydrocarbon (HC), and sulphur dioxide (SO2), have become more and more unacceptable ... Keywords: optic absorption spectroscopy based gas sensor, harmful exhaust emission monitoring, engine vibration

Chuliang Wei; Zhemin Zhuang; H. Ewald; A. I. Al-Shamma'a

2012-01-01T23:59:59.000Z

487

Fuel-Based On-Road Motor Vehicle Emissions Inventory  

E-Print Network (OSTI)

Fuel-Based On-Road Motor Vehicle Emissions Inventory for the Denver Metropolitan Area Sajal S sales from tax department -quite precise Inventory -uncertainty can be estimated Travel Based Model FuelGasohol (LTK, PAS) Tons/day3748369Gasoline (LTK, PAS) g per kg of fuel7859Gasohol (LTK, PAS) g per kg

Denver, University of

488

ROAD AND STREAM NETWORK CONNECTIVITY NORTHEASTERN PUERTO RICO  

E-Print Network (OSTI)

variables which are influenced by R/S connectivity. Physical R/S connectivity at 24 river road crossing (RRC alteration in the immediate area of the RRC. To gain incite into underlying dynamics scour scores were type, and Stream size, resulting in a model with a R2 value of 0.64. A method of evaluating RRC acting

489

Road Transportable Analytical Laboratory (RTAL) system: Volume I. Final report  

Science Conference Proceedings (OSTI)

This report describes a portable laboratory system for the analysis of soils, ground water, and surface waters for the detection and quantification of hazardous materials, organics, and radioactive contaminants. The goal of the Road Transportable Analytical Laboratory (RTAL) is a sample throughput of 20 samples per day, providing a full range of analysis on each sample within 16 hours of preparation with high accuracy.

Finger, S.M.; De Avila, J.C.; Keith, V.F.

1996-08-01T23:59:59.000Z

490

Pacific Northwest Laboratory FY 1993 Site Maintenance Plan for maintenance of DOE nonnuclear facilities  

SciTech Connect

This Site Maintenance Plan has been developed for Pacific Northwest Laboratory's (PNL) Nonnuclear Facilities. It is based on requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter I, Change No. 4. The objective of this maintenance plan is to provide baseline information for compliance to the DOE Order 4330.4A, to identify needed improvements, and to document the planned maintenance budget for Fiscal Year (FY) 1993 and to estimate maintenance budgets for FY 1994 and FY 1995 for all PNL facilities. Using the results of the self-assessment, PNL has selected 12 of the 36 elements of the Maintenance Program defined by DOE Order 4330.4A, Chapter I, for improvement. The elements selected for improvement are: Facility Condition Inspections; Work Request (Order) System; Formal Job Planning and Estimating; Work Performance (Time) Standards; Priority System; Maintenance Procedures and Other Work-Related Documents; Scheduling System; Post Maintenance Testing; Backlog Work Control; Equipment Repair History and Vendor Information; Work Sampling; and Identification and Control. Based upon a graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

Bright, J.D.

1992-09-28T23:59:59.000Z

491

Pacific Northwest Laboratory FY 1993 Site Maintenance Plan for maintenance of DOE nonnuclear facilities  

SciTech Connect

This Site Maintenance Plan has been developed for Pacific Northwest Laboratory`s (PNL) Nonnuclear Facilities. It is based on requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter I, Change No. 4. The objective of this maintenance plan is to provide baseline information for compliance to the DOE Order 4330.4A, to identify needed improvements, and to document the planned maintenance budget for Fiscal Year (FY) 1993 and to estimate maintenance budgets for FY 1994 and FY 1995 for all PNL facilities. Using the results of the self-assessment, PNL has selected 12 of the 36 elements of the Maintenance Program defined by DOE Order 4330.4A, Chapter I, for improvement. The elements selected for improvement are: Facility Condition Inspections; Work Request (Order) System; Formal Job Planning and Estimating; Work Performance (Time) Standards; Priority System; Maintenance Procedures and Other Work-Related Documents; Scheduling System; Post Maintenance Testing; Backlog Work Control; Equipment Repair History and Vendor Information; Work Sampling; and Identification and Control. Based upon a graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

Bright, J.D.

1992-09-28T23:59:59.000Z

492

The safe system approach: a road safety strategy based on human factors principles  

Science Conference Proceedings (OSTI)

In most safety critical domains, safety has been improved through the application of contemporary human error models and management methods. But the common strategic approach to improve road safety has so far mainly been built on the view that individual ... Keywords: human factors, road safety, road users, safe System approach, safety, system safety, vision zero

Peter Larsson, Claes Tingvall

2013-07-01T23:59:59.000Z

493

Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Maintenance and Safety to someone by E-mail Maintenance and Safety to someone by E-mail Share Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on Facebook Tweet about Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on Twitter Bookmark Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on Google Bookmark Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on Delicious Rank Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on Digg Find More places to share Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on AddThis.com... More in this section... Natural Gas Basics Benefits & Considerations Stations Vehicles Availability Conversions Emissions Maintenance & Safety

494

EA-1116: Kalina Geothermal Demonstration Project, Steamboat Springs, Nevada  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

16: Kalina Geothermal Demonstration Project, Steamboat 16: Kalina Geothermal Demonstration Project, Steamboat Springs, Nevada EA-1116: Kalina Geothermal Demonstration Project, Steamboat Springs, Nevada SUMMARY This EA evaluates the environmental impacts of the proposal for the U.S. Department of Energy Golden Field Office to partially fund assistance for the construction and operation of a privately owned 6-megawatt geothermal power plant which includes one geothermal production well, one injection well, and ancillary facilities such as on-site access road(s) and interconnected to electric transmission lines to existing geothermal power plants. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD February 22, 1999 EA-1116: Finding of No Significant Impact Kalina Geothermal Demonstration Project, Steamboat Springs, Nevada

495

Utilities are doing too much breaker maintenance  

Science Conference Proceedings (OSTI)

Many breaker failures occur after the breaker has been torn down for maintenance because some error was made in reassembling it. Utilities now can get a better understanding of circuit breaker reliability as the result of a worldwide survey conducted by the International Conference on Large High-Voltage Electric Systems (Cigre) of the reliability of circuit breakers 63 kV and above. The most significant finding is that the rate of major failures have dropped drastically with the introduction of modern SF[sub 6] breakers (from 1.58 to 0.67 per 100 breaker-years). But the rate of minor failures - such as gas leaks, which require maintenance and add to the operating cost - has increased by 30%. Incorrect maintenance causes far fewer failures in modern breakers, simply because they have to be torn down less frequently. Only 15% as many major failures and 77% as many minor failures can be attributed to incorrect maintenance. The failure to open or close on command are still the dominant major-failure modes of circuit breakers. 4 tabs.

Heising, C. (Reliability Consultant, Wynnewood, PA (United States))

1994-12-01T23:59:59.000Z

496

Incremental computation and maintenance of temporal aggregates  

Science Conference Proceedings (OSTI)

Abstract.We consider the problems of computing aggregation queries in temporal databases and of maintaining materialized temporal aggregate views efficiently. The latter problem is particularly challenging since a single data update can cause aggregate ... Keywords: Access methods, Aggregation, B-tree, Segment tree, Temporal database, View maintenance

Jun Yang; Jennifer Widom

2003-10-01T23:59:59.000Z

497

Hoisting and Rigging: Inspection and Maintenance Requirements  

E-Print Network (OSTI)

Devices, Slings, and Rigging Hardware and Accessories (SLAC-I-730-0A21S-036) Hoisting and Rigging: PreHoisting and Rigging: Inspection and Maintenance Requirements URL: http://www-group.slac.stanford.edu/esh/eshmanual/references/hoisting Department: Field Safety and Building Inspection Program: Hoisting and Rigging Authority: ESH Manual, Chapter

Wechsler, Risa H.

498

Davis PV plant operation and maintenance manual  

DOE Green Energy (OSTI)

This operation and maintenance manual contains the information necessary to run the Photovoltaics for Utility Scale Applications (PVUSA) test facility in Davis, California. References to more specific information available in drawings, data sheets, files, or vendor manuals are included. The PVUSA is a national cooperative research and demonstration program formed in 1987 to assess the potential of utility scale photovoltaic systems.

NONE

1994-09-01T23:59:59.000Z

499

Fifth EPRI International Conference on Maintenance Proceedings  

Science Conference Proceedings (OSTI)

The Fifth EPRI International Conference on Maintenance focused primarily on fossil and nuclear generating assets, but many topics will be applicable to other assets, as well. Equipment manufacturers, vendors, architect/engineers, and consultants will also find this conference prodedings to be informative and valuable.

2005-12-23T23:59:59.000Z

500

Ecological predictive maintenance in urban fleets  

Science Conference Proceedings (OSTI)

Motor vehicles are one of the largest sources of air pollutants worldwide. Several studies had concluded that particulate matter (PM) are responsible for some respiratory, cardiovascular, lung diseases, increasing in death from heart and may cause lung ... Keywords: HMM, degradation, ecological, environmental, exploitation, maintenance, particulate emissions, pollutant emissions, predictive

António Simões; José Torres Farinha; Inácio Fonseca; Luis Ferreira

2010-02-01T23:59:59.000Z