Mead-Liberty 345-kV Transmission Line Access Road Maintenance...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 Mead-Liberty 345-kV Transmission Line Access Road Maintenance and Localized Vegetation Management Maricopa County, Arizona Categorical Exclusion Continuation Sheet Project...

2

Curecanti-Blue Mesa-Salida 115-kV transmission lines access roads rehabilitation, maintenance, and construction project. Environmental Assessment  

SciTech Connect (OSTI)

Western Area Power Administration (Western) is a power marketing agency of the US Department of Energy, with jurisdiction in 15 western states. The Salt Lake City Area (SLCA) of Western performs the agency`s mission in parts of Colorado, New Mexico, Texas, Utah, Arizona, Wyoming, and Nevada. As part of its mission, Western owns, operates, and maintains a system of transmission lines for transmitting bulk electrical energy from points of generation to and between delivery points. Part of that system in southwestern Colorado includes the Blue Mesa-Curecanti and Blue Mesa-Salida 115-kV transmission lines. Western proposes to conduct maintenance and improve its access roads for these two transmission lines. This paper discusses the impacts to the existing environment as well as the environmental consequences resulting from the maintenance and construction that is proposed.

Not Available

1993-07-01T23:59:59.000Z

3

Project Surveillance and Maintenance Plan. [UMTRA Project  

SciTech Connect (OSTI)

The Project Surveillance and Maintenance Plan (PSMP) describes the procedures that will be used by the US Department of Energy (DOE), or other agency as designated by the President to verify that inactive uranium tailings disposal facilities remain in compliance with licensing requirements and US Environmental Protection Agency (EPA) standards for remedial actions. The PSMP will be used as a guide for the development of individual Site Surveillance and Maintenance Plans (part of a license application) for each of the UMTRA Project sites. The PSMP is not intended to provide minimum requirements but rather to provide guidance in the selection of surveillance measures. For example, the plan acknowledges that ground-water monitoring may or may not be required and provides the (guidance) to make this decision. The Site Surveillance and Maintenance Plans (SSMPs) will form the basis for the licensing of the long-term surveillance and maintenance of each UMTRA Project site by the NRC. Therefore, the PSMP is a key milestone in the licensing process of all UMTRA Project sites. The Project Licensing Plan (DOE, 1984a) describes the licensing process. 11 refs., 22 figs., 8 tabs.

Not Available

1985-09-01T23:59:59.000Z

4

Microsoft Word - FINAL Contact Record 2012-01 Roads Maintenance  

Office of Legacy Management (LM)

RFLMA Contact Record 2012-01 page 1 of 6 RFLMA Contact Record 2012-01 page 1 of 6 ROCKY FLATS SITE REGULATORY CONTACT RECORD Purpose: Soil Disturbance Review Plan-Roads maintenance, including grading the road to the former A-3 Pond to convert the road to two-track vehicle use. Contact Record Approval Date: May 31, 2012 Site Contact(s)/Affiliation(s): Scott Surovchak, U.S. Department of Energy (DOE); Gwen Hooton, DOE; Rick DiSalvo, S.M. Stoller Corporation (Stoller); Kurt Franzen, Stoller; Linda Kaiser, Stoller Regulatory Contact(s)/Affiliation(s): Carl Spreng, Colorado Department of Public Health and Environment (CDPHE); Vera Moritz, U.S. Environmental Protection Agency (EPA) Date of Consultation Meeting: May 24, 2012 Consultation Meeting Participants: Carl Spreng, CDPHE; Scott Surovchak, DOE;

5

West Valley Demonstration Project 10282 Rock Springs Road  

Broader source: Energy.gov (indexed) [DOE]

West Valley Demonstration Project West Valley Demonstration Project 10282 Rock Springs Road West Valley, NY 141 71 -9799 Mr. Daniel W. Coyne President & General Manager CH2M HILL B&W West Valley, LLC West Valley Demonstration Project 10282 Rock Springs Road West Valley, NY 141 71 -9799 ATTENTION: J. D. Rendall, Regulatory Strategy, AC-EA SUBJECT: Environmental Checklist WVDP-20 12-0 1, " WVDP Reservoir Interconnecting Canal Maintenance Activities" REFERENCE: Letter WD:2012:0409 (357953), D. W. Coyne to R. W. Reffner, "CONTRACT NO. DE-EM000 1529, Section 5-3, Item 105, NEPA Documentation (Transmittal of Environmental Checklist WVDP-20 12-0 1, WVDP Reservoir Interconnecting Canal Maintenance Activities), Revision 1 ," dated July 24, 20 12 Dear Mr. Coyne:

6

Hampton Roads Demonstration Project | Open Energy Information  

Open Energy Info (EERE)

Roads Demonstration Project Roads Demonstration Project Jump to: navigation, search Name Hampton Roads Demonstration Project Facility Hampton Roads Demonstration Project Sector Wind energy Facility Type Offshore Wind Facility Status Proposed Developer Virginia State Government Location Chesapeake Bay VA Coordinates 36.965°, -76.289° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":36.965,"lon":-76.289,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

7

Guidance for UMTRA project surveillance and maintenance  

SciTech Connect (OSTI)

The Guidance for UMTRA Project Surveillance and Maintenance describes the procedures that will be used to verify that Uranium Mill Tailings Remedial Action (UMTRA) Project disposal sites continue to function as designed. The approach of this guidance document is to identify surveillance requirements and maintenance procedures that will be used to comply with NRC license requirements. This document addresses five primary activities: Definition and characterization of final site conditions. Site inspections; Ground-water monitoring; Aerial photography; and Custodial maintenance and contingency repair. Final site conditions will be defined and characterized prior to the completion of remedial actions at a site. As-built drawings will be compiled, a final topographic survey will be performed, a vicinity map will be prepared, and ground and aerial photographs will be taken. Survey monuments, site markers, and signs will be established as will a network of monitoring wells.

NONE

1986-01-01T23:59:59.000Z

8

Rosetta on the Road: an outreach project  

E-Print Network [OSTI]

on the Road · Uses the groundbreaking ESA Rosetta mission ­ comet rendezvous and landing ­ as a basis

9

Kalispell Maintenance Headquarters Project : Environmental Assessment.  

SciTech Connect (OSTI)

The facilities needed to maintain and repair Bonneville Power Administration (BPA's) electrical equipment in northwest Montana are currently in two locations: A maintenance headquarters at the Kalispell Substation, and a temporary leased facility south of Kalispell. The present situation is not efficient. There is not enough space to accommodate the equipment needed at each site, and coordination and communication between the two sites is difficult. Also, two sites means duplication of equipment and facilities. BPA needs a single, centralized facility that would efficiently accommodate all the area's maintenance activities and equipment. BPA proposes to build a maintenance headquarters facility consisting of 2 to 4 single-story buildings totaling about 35,000 square feet (office spaces and workshop areas); an open-ended vehicle storage building (carport style); a fenced-in storage year; a storage building for flammables, herbicides, and hazardous wastes; and a parking lot. The facility would require developing about 6 to 10 acres of land. Two sites are being considered for the proposed project (see the attached map for locations). This report is the environmental assessment of the two options.

United States. Bonneville Power Administration.

1991-01-01T23:59:59.000Z

10

DOE Issues Environmental Assessment on Road Project for Public Review  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Brad Bugger (208) 526-0833 DOE Issues Environmental Assessment on Road Project for Public Review Brad Bugger (208) 526-0833 DOE Issues Environmental Assessment on Road Project for Public Review The U.S. Department of Energy has issued for public review and comment a draft environmental assessment of the potential environmental impacts of building an internal road to safely ship radioactive material within the Idaho National Laboratory. DOE�s preferred alternative under the environmental assessment is to develop a new, internal road that would connect the Idaho Nuclear Technology and Engineering Center with the Materials and Fuels Complex, a distance of about 20 miles. It would allow the INL to safely ship nuclear materials from the Idaho Nuclear Technology and Engineering Center and the Materials and Fuels Complex without having to utilize public roads, like Highway 20, which adds additional cost and security considerations to each shipment.

11

Project Project Funding Operational & Maintenance Costs Univ. Project Title GSF Brief Description of Project Location Amount Source  

E-Print Network [OSTI]

Project Project Funding Operational & Maintenance Costs Univ. Project Title GSF Brief Description of Project Location Amount Source UF Minor Projects for UF 50,000 Minor projects for facilities located and education. Typical projects consist of Gainesville/ Typical projects other funding greenhouses, general

Slatton, Clint

12

CRAD, Maintenance - Idaho Accelerated Retrieval Project Phase II |  

Broader source: Energy.gov (indexed) [DOE]

Idaho Accelerated Retrieval Project Phase II Idaho Accelerated Retrieval Project Phase II CRAD, Maintenance - Idaho Accelerated Retrieval Project Phase II Feburary 2006 A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Maintenance program at the Idaho National Laboratory, Idaho Accelerated Retrieval Project Phase II. CRADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, Maintenance - Idaho Accelerated Retrieval Project Phase II More Documents & Publications CRAD, Maintenance - Los Alamos National Laboratory TA 55 SST Facility

13

Project Information Form Project Title Reduction of Lifecycle Green House Gas Emissions From Road  

E-Print Network [OSTI]

Project Information Form Project Title Reduction of Lifecycle Green House Gas Emissions From Road@ucdavis.edu Funding Source(s) and Amounts Provided (by each agency or organization) US DOT $30,000 Total Project Cost Brief Description of Research Project This white paper will summarize the state of knowledge and state

California at Davis, University of

14

Reliability centered maintenance (RCM) for substations project overview  

SciTech Connect (OSTI)

An EPRI Tailored Collaboration project establishing guidelines and tools for implementing Reliability Centered Maintenance (RCM) in substations is nearing completion and final results are being presented at this Substation RCM Conference. The ultimate goal of this RCM project is to help utilities slash substation operations and maintenance costs by optimizing equipment maintenance intervals. Preventive maintenance (PM) programs typically have been developed on a component-by-component basis, relying heavily on equipment vendors` maintenance recommendations. RCM is a logical alternative to traditional PM programs. It is intelligent, common sense maintenance that is function-based rather than component-based. First developed by the airline industry in the 1960s and further developed and applied to the nuclear industry by EPRI in the 1980s, RCM ranks the importance of each function of a system, calculates the impact the loss of the function would have on the overall system, and drives the design of appropriate maintenance tasks for each function. The nuclear industry reaped savings of at least 25% by adopting RCM, and one utility that tried this approach for substation maintenance reported savings of 13% in one year.

Lyons, P.F.

1996-08-01T23:59:59.000Z

15

Modeling maintenance projects risk effects on ERP performance  

Science Journals Connector (OSTI)

Worldwide organizations have made important efforts to replace their legacy information applications by ERP (Enterprise Resource Planning) solutions. However, a suitable system implementation does not guarantee the ERP adoption success. This also depends ... Keywords: ERP maintenance, Simulations, Soft computing, Software project risks, System performance

Cristina Lpez; Jose L. Salmeron

2014-03-01T23:59:59.000Z

16

ExxonMobil Olefins Plant Projects, Maintenance and Optimizations  

E-Print Network [OSTI]

are endothermic and there are drastic differences in temperature and pressure across the process Quench & Heat Recovery Steam Cracker Furnace Compression Refrigeration Fractionation Cracked Products ProductsFeed Fuel 60% 35% 5% Ethylene Plant Energy Consumption...ExxonMobil Olefins Plant Projects, Maintenance and Optimizations Matt Neely Utilities Coordinator ExxonMobil Baytown Olefins Plant 2014 IETC May 21, 2014 ESL-IE-14-05-02 Proceedings of the Thrity-Sixth Industrial Energy Technology Conference New...

Neely, M. M.

2014-01-01T23:59:59.000Z

17

Project Profile: Maintenance-Free Stirling Engine for High-Performance...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Maintenance-Free Stirling Engine for High-Performance Dish CSP Project Profile: Maintenance-Free Stirling Engine for High-Performance Dish CSP Image of a prototype 30-kW Stirling...

18

EA-1982: Parker-Davis Transmission System Programmatic Operations and Maintenance Project; Arizona, California, and Nevada  

Broader source: Energy.gov [DOE]

Western Area Power Administration (Western) is preparing an EA to assess potential environmental impacts of the proposed continuation of operations and maintenance activities and implementation of a vegetation management program on Westerns Parker-Davis Transmission System. These actions would occur on existing transmission line and access road rights-of-way, and at substations and maintenance facilities associated with the transmission system.

19

Data collection, storage and integration requirements torealistically assess State road maintenance needs  

E-Print Network [OSTI]

Management Information System (MMIS), Salary and Labor Distribution System (SLD), Equipment Operating System (EOS), and Material Supply Management System (MSMS). The Single Entry Screen System (SES) was developed to allow input of data related to a... databases. These databases can be grouped according to their functions into: Maintenance Related Databases (MMS, SLD, EOS, MSMS) Pavement Related Databases (TRM, RIS, RIA, PMIS, RLSE) Bridge Related Databases (BRINSAP) 10 Construction related databases...

Prodhuturi, Venkat R.

1997-01-01T23:59:59.000Z

20

Archaeological investigations on the Buckboard Mesa Road Project  

SciTech Connect (OSTI)

In 1986, the Desert Research Institute (DRI) conducted an archaeological reconnaissance of a new alignment for the Buckboard Mesa Road on the Nevada Test Site for the Department of Energy (DOE). During this reconnaissance, several archaeological sites of National Register quality were discovered and recorded including a large quarry, site 26Ny4892, and a smaller lithic scatter, site 26Ny4894. Analysis of the debitage at 26Ny4892 indicates that this area was used primarily as a quarry for relatively small cobbles of obsidian found in the alluvium. Lithic reduction techniques used here are designed for efficiently reducing small pieces of toolstone and are oriented towards producing flake blanks from small cores and bifacially reducing exhausted cores. Projectile point cross references indicate that the area has seen at least casual use for about 10,000 years and more sustained use for the last 3,000 years. Initial obsidian hydration measurements indicate sustained use of the quarry for about the last 3,000 years although the loci of activities appear to change over time. Based on this study, the DRI recommends that quarrying activities in the area of 26Ny4892 are sufficiently sampled and that additional investigations into that aspect of prehistoric activity in the area are not necessary. This does not apply to other aspects of prehistoric use. DRI recommends that preconstruction surveys continue to identify nonquarrying, prehistoric utilization of the area. With the increased traffic on the Buckboard Mesa Road, there is a greater potential for vandalism to sites of National Register-quality located near the road. The DRI recommends that during the orientation briefing the workers at the Test Site be educated about the importance of cultural resources and the need for their protection. 202 refs., 41 figs., 52 tabs.

Amick, D.S.; Henton, G.H.; Pippin, L.C.

1991-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Tribal Renewable Energy Webinar on Project Implementation and Operations & Maintenance on Aug. 8  

Broader source: Energy.gov [DOE]

The Energy Department's Office of Indian Energy, Tribal Energy Program, and Western Area Power Administration will present the next Tribal Renewable Energy Series webinar, Project Implementation and Operations & Maintenance, on Friday, Aug. 8, 2014, from 11:00 a.m. to 12:30 p.m. Mountain time. The webinar will focus on the last two steps of a five-step tribal energy project development framework: Project Implementation and Operations and Maintenance (O&M).

22

Politics, Public Opinion, and Project Design in California Road Pricing  

E-Print Network [OSTI]

Unpublished Data) 13. Beal, Dan. Managing Director, Publicthe project is debated. Dan Beal (13) of the Automobile Clubagainst lifeline pricing. Beal (13) asserts that the

Smirti, Megan; Evans, Alexandra; Gougherty, Michael; Morris, Eric

2007-01-01T23:59:59.000Z

23

Amargosa Farm Road Solar Energy Project Solar Power Plant | Open Energy  

Open Energy Info (EERE)

Amargosa Farm Road Solar Energy Project Solar Power Plant Amargosa Farm Road Solar Energy Project Solar Power Plant Jump to: navigation, search Name Amargosa Farm Road Solar Energy Project Solar Power Plant Facility Amargosa Farm Road Solar Energy Project Sector Solar Facility Type Concentrating Solar Power Developer Solar Millenium, LLC, MAN Ferrostaal Inc Location Nye County, Nevada Coordinates 38.5807111°, -116.0413889° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.5807111,"lon":-116.0413889,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

24

AWEA Wind Project Operations and Maintenance and Safety Seminar  

Broader source: Energy.gov [DOE]

The AWEA Wind Project O&M and Safety Seminar is designed for owners, operators, turbine manufactures, material suppliers, wind technicians, managers, supervisors, engineers, and occupational...

25

EA-1982: Parker-Davis Transmission System Routine Operation and Maintenance Project and Proposed Integrated Vegetation Management Plan  

Broader source: Energy.gov [DOE]

Western Area Power Administration (Western) is preparing an EA to assess potential environmental impacts of the proposed continuation of operations and maintenance activities and implementation of a vegetation management program on Westerns Parker-Davis Transmission System. These actions would occur on existing transmission line and access road rights-of-way, and at substations and maintenance facilities associated with the transmission system.

26

Microsoft Word - CX-Ross-Lexington_access_road_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

Darin Bowman Darin Bowman Project Manager - TELF-TPP-3 Proposed Action: Access road repair including reconstructing, grading, and shaping of roads, placing and compacting of rock surfacing, installation of gates, installation and maintenance of erosion control and water drainage features, and restoration of disturbed areas. Budget Information: Work Order # 00259661 PP&A Project No.: 1738 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities...for...rights-of-way, infrastructures (e.g.. roads)...routine maintenance activities, corrective...are required to maintain and preserve infrastructures...in a condition suitable for the facility to be used for its designated purpose. Location: The project area is a Bonneville Power Administration (BPA) access road located on

27

Microsoft Word - CX-CentraliaAreaAccessRoadsFY13_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

Darin Bowman Project Manager TELF-TPP-3 Proposed Action: Access Road maintenance on the Chehalis-Centralia No. 1, Chehalis-Covington No. 1, Paul-Allston No. 2, and Paul-Napavine...

28

Building America Expert Meeting: Key Innovations for Adding Energy Efficiency to Maintenance Projects  

Broader source: Energy.gov [DOE]

This report describes an expert meeting hosted by the Building America research team NAHB Research Center, which was held on February 8, 2012, in Orlando, Florida. The topic, Key Innovations for Adding Energy Efficiency to Maintenance Projects, was intended to provide direction to more focused efforts to increase the efficiency of existing homes; in this meeting, the focus was specifically for re-roofing and the opportunities for adding energy efficiency upgrades during this major home repair activity.

29

Microsoft Word - CX-Ostrander-Troutdale-access_road_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

July 30, 2010 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Rick Ross Project Manager - TELF-TPP-3 Proposed Action: Ostrander-Troutdale No. 1 transmission line access road maintenance including grading and rocking of road surfaces and installation of water bars and cross drain culverts Budget Information: Work Order #: Unavailable PP&A Project No.: PP&A #1740 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities for rights-of-way, infrastructures (e.g. roads) routine maintenance activities corrective are required to maintain and preserve infrastructures in a condition suitable for the facility to be used for its designed purpose. Location: The proposed project is located within the Bonneville Power Administration (BPA)

30

Project Description In the search for superior batteries, the road to success is paved with advanced materials: better  

E-Print Network [OSTI]

Project Description In the search for superior batteries, the road to success is paved with advanced materials: better cathodes, better anodes, better electrolytes. The universe of candidates is so of this proposal is that by leveraging the advances in informatics and high-throughput experimental

Sadoway, Donald Robert

31

Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in the United States  

Broader source: Energy.gov [DOE]

For the United States to ensure that the substantial rollout of offshore wind energy projects envisioned by the DOE is carried out in an efficient and cost-effective manner, it is important to observe the current and emerging practices in the international offshore wind energy industry. In this manner, the United States can draw from the experience already gained around the world, combined with experience from the sizeable U.S. land-based wind industry, to develop a strong offshore wind sector. The work detailed in this report will support that learning curve by enabling optimization of the cost-effectiveness of installation, operation, and maintenance activities for offshore wind farms.

32

Kalispell Maintenance Headquarters Project : Environmental Assessment and Findings of No Significant Impact.  

SciTech Connect (OSTI)

The facilities needed to maintain and repair Bonneville Power Administration (BPA`s) electrical equipment in northwest Montana are currently in two locations: A maintenance headquarters at the Kalispell Substation, and a temporary leased facility south of Kalispell. The present situation is not efficient. There is not enough space to accommodate the equipment needed at each site, and coordination and communication between the two sites is difficult. Also, two sites means duplication of equipment and facilities. BPA needs a single, centralized facility that would efficiently accommodate all the area`s maintenance activities and equipment. BPA proposes to build a maintenance headquarters facility consisting of 2 to 4 single-story buildings totaling about 35,000 square feet (office spaces and workshop areas); an open-ended vehicle storage building (carport style); a fenced-in storage year; a storage building for flammables, herbicides, and hazardous wastes; and a parking lot. The facility would require developing about 6 to 10 acres of land. Two sites are being considered for the proposed project (see the attached map for locations). This report is the environmental assessment of the two options.

United States. Bonneville Power Administration.

1991-12-01T23:59:59.000Z

33

Design criteria document, Maintenance Shop/Support Facility, K-Basin Essential Systems Recovery, Project W-405  

SciTech Connect (OSTI)

During the next 10 years a substantial amount of work is scheduled in the K-Basin Area related to the storage and eventual removal of irradiated N-Reactor fuel. Currently, maintenance support activities are housed in existing structures that were constructed in the early 1950`s. These forty-year-old facilities and their supporting services are substandard, leading to inefficiencies. Because of numerous identified deficiencies and the planned increase in the numbers of K-Basin maintenance personnel, adequate maintenance support facilities that allow efficient operations are needed. The objective of this sub-project of Project W-405 is to provide a maintenance and storage facility which meets the K-Basin Maintenance Organization requirements as defined in Attachment 1. In Reference A, existing guidelines and requirements were used to allocate space for the maintenance activities and to provide a layout concept (See Attachment 2). The design solution includes modifying the existing 190 K-E building to provide space for shops, storage, and administration support functions. The primary reason for the modification is to simplify siting/permitting and make use of existing infrastructure. In addition, benefits relative to design loads will be realized by having the structure inside 190K-E. The new facility will meet the Maintenance Organization approved requirements in Attachment 1 relating to maintenance activities, storage areas, and personnel support services. This sub-project will also resolve outstanding findings and/or deficiencies relating to building fire protection, HVAC requirements, lighting replacement/upgrades, and personnel facilities. Compliance with building codes, local labor agreements and safety standards will result.

Strehlow, M.W.B.

1994-12-14T23:59:59.000Z

34

Expert Meeting Report: Key Innovations for Adding Energy Efficiency to Maintenance Projects  

Broader source: Energy.gov (indexed) [DOE]

Key Innovations for Key Innovations for Adding Energy Efficiency to Maintenance Projects A. Wood and J. Wiehagen NAHB Research Center September 2012 NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, subcontractors, or affiliated partners makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply

35

Microsoft Word - CX-Boyer-Tillamook_access_road_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

James Semrau Project Manager - TELF-TPP-3 David Forward TELF-TPP-3 Proposed Action: Boyer-Tillamook No. 1 transmission line access road maintenance including grading and rocking of road surfaces and installation of water bars and cross drain culverts Budget Information: Work Order #00253279 PP&A Project No.: PP&A 1533 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities...for...rights-of-way...(e.g. roads)...required to maintain and preserve...infrastructures in a condition suitable for a facility to be used for its designated purpose. Location: Tillamook and Yamhill counties, Oregon. Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action:

36

Microsoft Word - CX-Cardwell-Cowlitz2011AccessRoad_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

KEP-4 KEP-4 SUBJECT: Environmental Clearance Memorandum Rick Ross Project Manager - TELF-TPP-3 Proposed Action: Access road maintenance on or leading to the Cardwell-Cowlitz No.1, 115-kilovolt (kV) transmission line. Budget Information: Work Order #00281014 PP&A Project No.: 2020 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities... for...rights-of-way, infrastructures (e.g.. roads)... routine maintenance activities, corrective...are required to maintain and preserve infrastructures...in a condition suitable for the facility to be used for its designated purpose. Location: The project area consists of Bonneville Power Administration (BPA) access roads located on or leading to the Cardwell-Cowlitz No. 1, 115-kV transmission line right-of-way.

37

Microsoft Word - CX-McNary-SantiamAccessRoad_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

James Semrau Project Manager - TELF-TPP-3 Proposed Action: Access road maintenance along the McNary-Santiam 230-kV and Jones Canyon-Santiam 230-kV transmission line corridors. Budget Information: WO #00292092 PP&A Project No.: 2044 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities... for...rights-of-way, infrastructures (e.g.. roads)... routine maintenance activities, corrective...are required to maintain and preserve infrastructures...in a condition suitable for the facility to be used for its designated purpose. Location: The project area consists of Bonneville Power Administration (BPA) access roads located on the McNary-Santiam (structure 123/1) & Jones Canyon-Santiam (structure 75/1)

38

Microsoft Word - CX-Kalispell-KerrMile15-16AccessRoadImprovementFY12_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

2 2 REPLY TO ATTN OF: KEPR-Bell-1 SUBJECT: Environmental Clearance Memorandum Joe Johnson Project Manager - TELF-TPP-3 Proposed Action: Access road improvement for the Kalispell-Kerr #1, 115-kilovolt (kV) transmission line PP&A Project No.: 2474 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine Maintenance, B1.13 Pathways, short access roads, and rail lines Location: Township 26 North, Range 21 West, Section 13 and 24, Flathead County, MT. Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to perform access road maintenance on several segments of the access road for the Kalispell-Kerr #1, 115-kV transmission line. Work includes reconstruction and drainage enhancements on 5000 feet of road beginning at structure

39

Two Innovative Steps for Training on Maintenance: 'VIRMAN' Spanish Project based on Virtual Reality 'STARMATE' European Project based on Augmented Reality  

SciTech Connect (OSTI)

This paper presents two development projects (STARMATE and VIRMAN) focused on supporting training on maintenance. Both projects aim at specifying, designing, developing, and demonstrating prototypes allowing computer guided maintenance of complex mechanical elements using Augmented and Virtual Reality techniques. VIRMAN is a Spanish development project. The objective is to create a computer tool for maintenance training course elaborations and training delivery based on 3D virtual reality models of complex components. The training delivery includes 3D record displays on maintenance procedures with all complementary information for intervention understanding. Users are requested to perform the maintenance intervention trying to follow up the procedure. Users can be evaluated about the level of knowledge achieved. Instructors can check the evaluation records left during the training sessions. VIRMAN is simple software supported by a regular computer and can be used in an Internet framework. STARMATE is a forward step in the area of virtual reality. STARMATE is a European Commission project in the frame of 'Information Societies Technologies'. A consortium of five companies and one research institute shares their expertise in this new technology. STARMATE provides two main functionalities (1) user assistance for achieving assembly/de-assembly and following maintenance procedures, and (2) workforce training. The project relies on Augmented Reality techniques, which is a growing area in Virtual Reality research. The idea of Augmented Reality is to combine a real scene, viewed by the user, with a virtual scene, generated by a computer, augmenting the reality with additional information. The user interface is see-through goggles, headphones, microphone and an optical tracking system. All these devices are integrated in a helmet connected with two regular computers. The user has his hands free for performing the maintenance intervention and he can navigate in the virtual world thanks to a voice recognition system and a virtual pointing device. The maintenance work is guided with audio instructions, 2D and 3D information are directly displayed into the user's goggles: There is a position-tracking system that allows 3D virtual models to be displayed in the real counterpart positions independently of the user allocation. The user can create his own virtual environment, placing the information required wherever he wants. The STARMATE system is applicable to a large variety of real work situations. (author)

Gonzalez Anez, Francisco [Tecnatom s.a., Avda. Montes de Oca 1, 28709 San Sebastian de los Reyes, Madrid (Spain)

2002-07-01T23:59:59.000Z

40

Nez Perce Tribal Hatchery Project, Operations and Maintenance and Planning and Design, 2001 Annual Report.  

SciTech Connect (OSTI)

This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2001 annual report combines information from two contracts with a combined value of $2,336,491. They are identified by Bonneville Power Administration as follows: (1) Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and (2) Planning and Design--Project No. 1983-350-00, Contract No. 4035. The Operations and Maintenance (O&M) budget of $2,166,110 was divided as follows: Facility Development and Fish Production Costs--$860,463; and Equipment Purchases as capital cost--$1,305,647 for equipment and subcontracts. The Planning and Design (P&D) budget of $170,381 was allocated to development of a Coho master planning document in conjunction with Nez Perce Tribal Hatchery. The O&M budget expenditures represent personnel and fish production expenses; e.g., administration, management, coordination, facility development, personnel training and fish production costs for spring Chinook and Coho salmon. Under Objective 1: Fish Culture Training and Education, tribal staff worked at Clearwater Anadromous Hatchery (CAFH) an Idaho Department of Fish and Game (IDFG) facility to produce spring Chinook smolt and parr for release that are intended to provide future broodstock for NPTH. As a training exercise, BPA allowed tribal staff to rear Coho salmon at Dworshak National Fish Hatchery, a U.S. Fish and Wildlife Service (USFWS) facility. This statement of work allows this type of training to prepare tribal staff to later rear salmon at Nez Perce Tribal Hatchery under Task 1.6. As a subset of the O&M budget, the equipment purchase budget of $1,305,647 less $82,080 for subcontracts provides operational and portable equipment necessary for NPTH facilities after construction. The equipment budget for the year was $1,223,567; this year's purchases amounted $287,364.48 (see Table 5). Purchases are itemized in Appendix D and E. FishPro, Inc. assisted tribal staff with equipment purchases. The unspent contract balances will be carried forward to the ensuing year to complete equipment purchases essential to hatchery operations. The NPTH activities focused on completion of the Northwest Power Planning Council Step-3 decision that authorized hatchery construction. Construction began in July 2000. It is anticipated to continue through October 2002. At the end of 2001, the hatchery facilities were approximately 70% completed and the budget approximately 90% expended. The following facilities are either completed or in final stages of construction: (1) NPTH Central Hatchery facility at Site 1705, and (2) North Lapwai Valley satellite, and (3) Sweetwater Springs satellite, and (4) Yoosa-Camp satellite, and (5) Newsome Creek satellite, and (6) Lukes Gulch satellite, and (7) Cedar Flats satellite.

Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

2006-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Maintenance and Veg Management  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Infrastructure projects Interconnection OASIS OATT Reauthorization of Transmission Line Permits, Maintenance and Vegetation Management on Forest Service Lands in Colorado,...

42

Maintenance and operations contractor plan for transition to the project Hanford management contract (PHMC)  

SciTech Connect (OSTI)

This plan has been developed by Westinghouse Hanford Company (WHC), and its subcontractors ICF Kaiser Hanford (ICF KH) and BCS Richland, Inc. (BCSR), at the direction of the US Department of Energy (DOE), Richland Operations Office (RL). WHC and its subcontractors are hereafter referred to as the Maintenance and Operations (M and O) Contractor. The plan identifies actions involving the M and O Contractor that are critical to (1) prepare for a smooth transition to the Project Hanford Management Contractor (PHMC), and (2) support and assist the PHMC and RL in achieving transition as planned, with no or minimal impact to ongoing baseline activities. The plan is structured around two primary phases. The first is the pre-award phase, which started in mid-February 1996 and is currently scheduled to be completed on June 1, 1996, at which time the contract is currently planned to be awarded. The second is the follow-on four-month post-award phase from June 1, 1996, until October 1, 1996. Considering the magnitude and complexity of the scope of work being transitioned, completion in four months will require significant effort by all parties. To better ensure success, the M and O Contractor has developed a pre-award phase that is intended to maximize readiness for transition. Priority is given to preparation for facility assessments and processing of personnel, as these areas are determined to be on the critical path for transition. In addition, the M and O Contractor will put emphasis during the pre-award phase to close out open items prior to contract award, to include grievances, employee concerns, audit findings, compliance issues, etc.

Waite, J.L.

1996-04-12T23:59:59.000Z

43

Stochastic Modeling of Future Highway Maintenance Costs for Flexible Type Highway Pavement Construction Projects  

E-Print Network [OSTI]

that affect pavement performances; 2) develop a stochastic model that predicts future maintenance costs of flexible-type pavement in Texas. The study data were gathered through the Pavement Management Information System (PMIS) containing more than 190...

Kim, Yoo Hyun

2012-07-16T23:59:59.000Z

44

CNG in OKC: Improving Efficiency at the Pump and on the Road | Department  

Broader source: Energy.gov (indexed) [DOE]

CNG in OKC: Improving Efficiency at the Pump and on the Road CNG in OKC: Improving Efficiency at the Pump and on the Road CNG in OKC: Improving Efficiency at the Pump and on the Road March 8, 2012 - 4:02pm Addthis Andy Mitchell, Public Works Project Manager for the City of Oklahoma City, refills a vehicle at the new fast-fill CNG fueling station located at the city's main maintenance facility. | Courtesy of the City of Oklahoma City. Andy Mitchell, Public Works Project Manager for the City of Oklahoma City, refills a vehicle at the new fast-fill CNG fueling station located at the city's main maintenance facility. | Courtesy of the City of Oklahoma City. Jennifer Holman Project Officer, Golden Field Office What does this mean for me? Switching from gasoline and diesel fuels to compressed natural gas (CNG) can mean significantly lower amounts of carbon dioxide and air

45

Electricity for road transport, flexible power systems and wind...  

Open Energy Info (EERE)

Electricity for road transport, flexible power systems and wind power (Smart Grid Project) Jump to: navigation, search Project Name Electricity for road transport, flexible power...

46

Microsoft Word - maintenance  

Broader source: Energy.gov (indexed) [DOE]

System Maintenance Checklist System Maintenance Checklist The following checklist is intended to provide system owners, project managers and other information system developers and maintainers with guidance in identifying and planning system maintenance activities. The objectives of system maintenance are summarized as: C Resolution of errors, faults, and failures. C The requirements for system maintenance initiates lifecycle changes. The change is remapped and executed, thereby treating the maintenance process as iterations of development. Rev: 09/02 1 Maintenance Checklist SEM Reference Comments " A procedure exists for handling emergency changes that cannot be implemented as part of a scheduled release. Chapter 10 Maintenance " An identification number is assigned to the modification.

47

Prototypical Rod Consolidation Demonstration Project. Phase 3, Final report: Volume 4, Operations and maintenance manual, Book 5  

SciTech Connect (OSTI)

The objective of Phase III of the Prototypical Rod Consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod Consolidation System as described in the NUS Phase II Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase III effort the system was tested on a component, subsystem, and system level. Volume IV provides the Operating and Maintenance Manual for the Prototypical Rod Consolidation System that was installed at the Cold Test Facility. This document, Book 5 of Volume IV, discusses: Corrective maintenance procedures; Calibration procedures; Surveillance procedures; Equipment changeover procedures; Decontamination procedures; Recovery procedures; and Cable schedule.

Not Available

1993-05-01T23:59:59.000Z

48

Prototypical Rod Consolidation Demonstration Project. Phase 3, Final report: Volume 4, Operations and maintenance manual, Book 4  

SciTech Connect (OSTI)

The objective of Phase III of the Prototypical Rod Consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod Consolidation System as described in the NUS Phase II Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase III effort the system was tested on a component, subsystem, and system level. Volume IV provides the Operating and Maintenance Manual for the Prototypical Rod Consolidation System that was installed at the Cold Test Facility. This document, Book 4 of Volume IV, discusses: Off-normal operating and recovery procedures; Emergency response procedures; Troubleshooting procedures; and Preventive maintenance procedures.

Not Available

1993-05-01T23:59:59.000Z

49

Microsoft Word - CX-Satsop-Aberdeen roads FY10_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

30, 2010 30, 2010 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Jim Semrau Project Manager - TELF-TPP-3 Proposed Action: Maintenance of access roads serving the Satsop-Aberdeen No. 2 and No. 3, and the Aberdeen Tap to South Elma-Cosmopolis transmission lines PP&A Project No.: 1697 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads, equipment... routine maintenance activities, corrective...are required to maintain...infrastructures...in a condition suitable for a facility to be used for its designated purpose. Location: The Project is located in Gray's Harbor County, Washington, between the towns of

50

Microsoft Word - CX-Ross-Lexington_access_road_addition_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

KEPR-4 KEPR-4 SUBJECT: Environmental Clearance Memorandum Dawneen Dostert Project Manager - TERR-LMT Proposed Action: New access road construction to include clearing, grading, and shaping of roads, placing and compacting of rock surfacing, installation of gates, installation and maintenance of erosion control and water drainage features, and restoration of disturbed areas Budget Information: Work Order # 00230995 PP&A Project No.: 1534 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.13 Construction/ acquisition/relocation of onsite pathways, short onsite access roads/railroads. Location: The project area is confined to the existing and proposed access roads around the right-of-way (ROW) corridor of Bonneville Power Administration's (BPA) Ross-Lexington

51

Microsoft Word - CX-GarrisonSubstationAccessRoadImprovementFY13_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

8, 2013 8, 2013 REPLY TO ATTN OF: KEPR-Bell-1 SUBJECT: Environmental Clearance Memorandum Jonathan Malmberg Project Manager - TETQ-TPP-3 Proposed Action: Maintenance along sections of the access road leading to Bonneville Power Administration's (BPA) Garrison Substation PP&A Project No.: 2609 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine Maintenance. B1.13 Pathways, short access roads, and rail lines. Location: As identified in table below: Township Range Section County 9N 11W 14, 13, 24 Powell 9N 10W 19, 30, 20 Powell Proposed by: BPA Description of the Proposed Action: BPA proposes repairing a corrugated metal pipe end; making minor asphalt repairs; and grading, shaping, compacting, and placing road aggregate on 20,005 linear feet

52

Data Collection for Current U.S. Wind Energy Projects: Component Costs, Financing, Operations, and Maintenance; January 2011 - September 2011  

SciTech Connect (OSTI)

DNV Renewables (USA) Inc. (DNV) used an Operations and Maintenance (O&M) Cost Model to evaluate ten distinct cost scenarios encountered under variations in wind turbine component failure rates. The analysis considers: (1) a Reference Scenario using the default part failure rates within the O&M Cost Model, (2) High Failure Rate Scenarios that increase the failure rates of three major components (blades, gearboxes, and generators) individually, (3) 100% Replacement Scenarios that model full replacement of these components over a 20 year operating life, and (4) Serial Failure Scenarios that model full replacement of blades, gearboxes, and generators in years 4 to 6 of the wind project. DNV selected these scenarios to represent a broad range of possible operational experiences. Also in this report, DNV summarizes the predominant financing arrangements used to develop wind energy projects over the past several years and provides summary data on various financial metrics describing those arrangements.

Martin-Tretton, M.; Reha, M.; Drunsic, M.; Keim, M.

2012-01-01T23:59:59.000Z

53

Rapid road repair vehicle  

DOE Patents [OSTI]

Disclosed is a rapid road repair vehicle capable of moving over a surface to be repaired at near normal posted traffic speeds to scan for and find at the high rate of speed, imperfections in the pavement surface, prepare the surface imperfection for repair by air pressure and vacuum cleaning, applying a correct amount of the correct patching material to effect the repair, smooth the resulting repaired surface, and catalog the location and quality of the repairs for maintenance records of the road surface. The rapid road repair vehicle can repair surface imperfections at lower cost, improved quality, at a higher rate of speed than was not heretofor possible, with significantly reduced exposure to safety and health hazards associated with this kind of road repair activities in the past. 2 figs.

Mara, L.M.

1998-05-05T23:59:59.000Z

54

Rapid road repair vehicle  

DOE Patents [OSTI]

Disclosed is a rapid road repair vehicle capable of moving over a surface to be repaired at near normal posted traffic speeds to scan for and find an the high rate of speed, imperfections in the pavement surface, prepare the surface imperfection for repair by air pressure and vacuum cleaning, applying a correct amount of the correct patching material to effect the repair, smooth the resulting repaired surface, and catalog the location and quality of the repairs for maintenance records of the road surface. The rapid road repair vehicle can repair surface imperfections at lower cost, improved quality, at a higher rate of speed than was was heretofor possible, with significantly reduced exposure to safety and health hazards associated with this kind of road repair activities in the past.

Mara, Leo M. (Livermore, CA)

1998-01-01T23:59:59.000Z

55

Microsoft Word - CX-LowerGranite-HatwaiAccessRoadImprovementFY13_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

9, 2012 9, 2012 REPLY TO ATTN OF: KEPR-Bell-1 SUBJECT: Environmental Clearance Memorandum Kristi Unholz Project Manager - TELF-TPP-3 Proposed Action: Improve the access road system in miles 4, 5, 16, 17, 18, and 30 of the Lower Granite-Hatwai transmission line PP&A Project No.: 2378 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine Maintenance. B1.13 Pathways, short access roads, and rail lines Location: As identified in table below: Lower Granite-Hatwai Access Road Project Location Township Range Section County, State mile 4 to mile 5 13N 43E 2 Whitman, WA mile 16 12N 45E 8 mile 17 12N 45E 17 mile 18 12N 45E 20 mile 30 36N 5W 19, 30 Nez Perce, ID Proposed by: Bonneville Power Administration (BPA)

56

Yakima/Klickitat Fisheries Project Phase II Fish Screen Operation and Maintenance; Washington Department of Fish and Wildlife, 2005-2006 Annual Report.  

SciTech Connect (OSTI)

The goal of this project is to assure that the benefits of BPA's capital investment in Yakima Basin Phase II fish screen facilities are realized by performing operations that assure optimal fish protection and long facility life through a rigorous preventative maintenance program, while helping to restore ESA listed fish stocks in the Yakima River Basin.

Schille, Patrick C. (Washington Department of Fish and Wildlife, Habitat Program, Yakima, WA)

2006-05-01T23:59:59.000Z

57

Mn/DOT County Road Safety Plans  

E-Print Network [OSTI]

Roads Program !! Minnesota Central Safety Funds !! Foster safety culture among county stakeholders 41 Mn/DOT County Road Safety Plans CTS Annual Research Conference April 27 & 28, 2010 Howard Preston & Objectives !! Project Overview !! Schedule, Participating Counties, Approach !! Safety Emphasis Areas

Minnesota, University of

58

Categorical Exclusion for Access Road  

Broader source: Energy.gov (indexed) [DOE]

Access Road Access Road Improvements along the Pinnacle Peak- Prescott 230-kV Transmission Line between Structures 16813 and 170/1 Yavapai County. Arizona * RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to improve access roads along a portion of the Pinnacle Peak to Prescott 230-kV Transmission Line (Structures 168/3 and 170/1). which are currently impassable. to maintain worker safety and the reliability of the bulk electric system. Western plans to blade and grade the existing access road where it enters and leaves three washes so that Western's maintenance vehicles can drive across the washes. We will remove dirt from the road prism by starting at wash edges and pulling dirt up slope in order to create ramps with grades suitable for our equipment.

59

Project 328  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5 5 CONTACTS Gary J. Stiegel Gasification Technology Manager National Energy Technology Laboratory 626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236 412-386-4499 gary.stiegel@netl.doe.gov Jenny Tennant Project Manager National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507 304-285-4830 Jenny.Tennant@netl.doe.gov Gasification Technologies Conceptual drawing of Rocketdyne's gasification system ADVANCED GASIFICATION SYSTEMS DEVELOPMENT Description Rocketdyne will apply rocket engine technology to gasifier design, allowing for a paradigm shift in gasifier function, resulting in significant improvements in capital and maintenance costs. Its new gasifier will be an oxygen-blown, dry-feed, plug-flow entrained reactor able to achieve carbon conversions of nearly 100 percent by rapidly heating low coal particles

60

GENII (Generation II): The Hanford Environmental Radiation Dosimetry Software System: Volume 3, Code maintenance manual: Hanford Environmental Dosimetry Upgrade Project  

SciTech Connect (OSTI)

The Hanford Environmental Dosimetry Upgrade Project was undertaken to incorporate the internal dosimetry models recommended by the International Commission on Radiological Protection (ICRP) in updated versions of the environmental pathway analysis models used at Hanford. The resulting second generation of Hanford environmental dosimetry computer codes is compiled in the Hanford Environmental Dosimetry System (Generation II, or GENII). This coupled system of computer codes is intended for analysis of environmental contamination resulting from acute or chronic releases to, or initial contamination of, air, water, or soil, on through the calculation of radiation doses to individuals or populations. GENII is described in three volumes of documentation. This volume is a Code Maintenance Manual for the serious user, including code logic diagrams, global dictionary, worksheets to assist with hand calculations, and listings of the code and its associated data libraries. The first volume describes the theoretical considerations of the system. The second volume is a Users' Manual, providing code structure, users' instructions, required system configurations, and QA-related topics. 7 figs., 5 tabs.

Napier, B.A.; Peloquin, R.A.; Strenge, D.L.; Ramsdell, J.V.

1988-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Microsoft Word - CX-IndianCabinRoadRepair_PPA1908_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

United States Government Department of Energy United States Government Department of Energy Bonneville Power Administration DATE: June 22, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Elizabeth Johnson Natural Resource Specialist - TFBV-THE DALLES Proposed Action: Indian Cabin Road Repair PP&A Project No.: 1908 Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance activities...for structures, rights of way, infrastructures such as roads, equipment... routine maintenance activities, corrective....are required to maintain...infrastructures...in a condition suitable for a facility to be used for its designated purpose. Location: The project is located in Skamania County, Washington, T3N, R8E, Sections 27

62

Microsoft Word - CX-Marion-AlveyMarion-LaneAccessRoad_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

REPLY TO ATTN OF: KEP-Alvey SUBJECT: Environmental Clearance Memorandum Darin Bowman Manuel Campos Civil Engineer - TELF-TPP-3 Civil Engineer - TELF-TPP-3 Proposed Action: Access road improvements along portions of the Marion-Alvey #1 and Marion-Lane #1 transmission line rights-of-way. PP&A Project No: 1961 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities...for structures, rights of way, infrastructures such as roads, equipment... routine maintenance activities, corrective....are required to maintain...infrastructures...in a condition suitable for a facility to be used for its designed purpose. Location: The project area is located in Marion and Linn counties, Oregon, in Bonneville

63

Small-scale hydroelectric power demonstration project: Broad River Electric Cooperative, Inc. , Cherokee Falls, South Carolina: Final operations and maintenance report  

SciTech Connect (OSTI)

The purpose of this report is to give a final accounting of the costs and benefits derived from the first two years of operation of the Cherokee Falls, Broad River Hydroelectric Demonstration Project which was built at Cherokee Falls, South Carolina. Prior to construction, Broad River Electric Cooperative, Inc. (BREC) executed a Cooperative Agreement with the US Department of Energy (DOE) Number FC07-80ID12125 which provided $1,052,664 toward the construction of the facility. This agreement requires that BREC document for DOE a summary of the complete operating statistics, operating and maintenance cost, and revenues from power sales for a two-year operating period. A complete reporting covering the design, technical, construction, legal, institutional, environmental and other related aspects of the total project was furnished to DOE previously for publication as the ''Final Technical and Construction Cost Report''. For this reason these elements will not be addressed in detail in this report. In order to make this account a more meaningful discussion of the initial two-year and four month production period, it is necessary to detail several unique events concerning the project which set Cherokee Falls apart from other projects developed under similar Cooperative Agreements with DOE. Accordingly, this report will discuss certain major problems experienced with the design, operation and maintenance, energy production, as well as the operation and maintenance cost and value of the power produced for the first 28 months of operation. 3 figs.

Not Available

1988-08-01T23:59:59.000Z

64

Global Roads Global Roads Open Access Data Set, Version 1 (gROADSv1): South America  

E-Print Network [OSTI]

0 1,000 Km Global Roads Global Roads Open Access Data Set, Version 1 (gROADSv1): South America South America Lambert Conformal Conic Projection Data source: Center for International Earth Science

Columbia University

65

Maintenance Types  

Broader source: Energy.gov [DOE]

Proper operations and maintenance (O&M) goes beyond repairing equipment after it breaks. Several maintenance strategies exist to prevent systems disrepair and degradation. A combination of the...

66

Tim Kuneli, Electronics Maintenance Group  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tim Kuneli, Electronics Maintenance Group Print The recent ALS power supply failure was one of the most challenging projects that Electronics Engineer Technical Superintendent Tim...

67

The Wind Project Development Process  

Wind Powering America (EERE)

Wind Project Wind Project Development Process Developed for the National Renewable Energy Laboratory by Dale Osborn Distributed Generation Systems, Inc. September 1998 The Wind Project Development Process Site Selection Land Agreements Wind Assessment Environmental Review Economic Modeling Interconnection Studies Financing Permitting Sales Agreements Turbine Procurement Construction Contracting Operations & Maintenance Site Selection Evidence of Significant Wind Preferably Privately Owned Remote Land Proximity to Transmission Lines Reasonable Road Access Few Environmental Concerns Receptive Community Land Agreements Term: Expected Life of the Turbine Assignable Indemnification Rights Compensation: Percentage of Revenues Reclamation Provision Wind Rights, Ingress/Egress Rights, Transmission Rights

68

Reactive Maintenance  

Broader source: Energy.gov [DOE]

Reactive maintenance follows a run-it-until-it-breaks strategy where no actions or efforts are taken to maintain equipment as intended by the manufacturer. Studies indicate this is still the predominant mode of maintenance for Federal facilities.

69

Microsoft Word - CX-Longview-Chehalis-etall-2013-AccessRoad_WEB...  

Broader source: Energy.gov (indexed) [DOE]

Proposed Action: Access road maintenance on Bonneville Power Administration's (BPA) Longview-Chehalis No. 1 and No. 3, and Lexington-Longview No. 1 transmission line...

70

The ethanol heavy-duty truck fleet demonstration project  

SciTech Connect (OSTI)

This project was designed to test and demonstrate the use of a high- percentage ethanol-blended fuel in a fleet of heavy-duty, over-the- road trucks, paying particular attention to emissions, performance, and repair and maintenance costs. This project also represents the first public demonstration of the use of ethanol fuels as a viable alternative to conventional diesel fuel in heavy-duty engines.

NONE

1997-06-01T23:59:59.000Z

71

WINDERMERE RD WesternRoadWesternRoad  

E-Print Network [OSTI]

WINDERMERE RD N 2 210 Kilometres 186 189 194 WesternRoadWesternRoad Oxford Street Oxford Street 2 2 Street (9 kms) · Turn left (west) onto Oxford Street and follow to Wharncliffe Road (4 kms) · Turn right (north) onto Wharncliffe Road and follow to the fifth set of traffic lights · Turn left (west

Sinnamon, Gordon J.

72

Tanzania Roads Evaluation - Baseline | Data.gov  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tanzania Roads Evaluation - Baseline Tanzania Roads Evaluation - Baseline Agriculture Community Menu DATA APPS EVENTS DEVELOPER STATISTICS COLLABORATE ABOUT Agriculture You are here Data.gov » Communities » Agriculture » Data Tanzania Roads Evaluation - Baseline Dataset Summary Description Baseline survey for impact evaluation of MCC's roads improvement investments in Tanzania. The evaluation will examine the project's household- and community-level effects on local standards of living along the roads. For the evaluation of major roads on the mainland, Economic Development Initiatives conducted a survey of 3,000 households in 200 communities in 2009. For the Pemba rural roads evaluation, Economic Development Initiatives conducted a survey on 570 households in the treatment group and 630 households in the comparison group.

73

E-Print Network 3.0 - agreement maintenance based Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Pave? Making Informed Decisions on When to Summary: A cost analysis based on spending history for low volume roads A method for estimating maintenance... in this study ...

74

Operations & Maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Contact Information Transmission Planning Western OATT Revision Maintenance Services Meter policy (pdf) Meter application agreement Behind the Meter Generation policy (doc)...

75

Remote maintenance  

SciTech Connect (OSTI)

A general description is given of the study of maintenance design in reactor designs. The Fusion Experimental Reactor and INTOR-J are discussed in terms of simplicity in remote maintenance design, and a figure shows one of the designs of a torus sector configuration for the Fusion Experimental Reactor. An R-tokamak which is under design is a D-T burning device with a Q less than unity. Technical issues are listed and it is suggested that a long-range plan for fusion remote maintenance should be implemented. A multijoint inspection system and a remote maintenance simulation test model of the divertor module are shown.

Kazawa, Y.; Tachikawa, K.; Tone, T.

1983-12-01T23:59:59.000Z

76

Microsoft Word - CX-GrandCouleeDistrictWoodPoleReplacementsAccessRoadsFY13_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

KEPR-Bell-1 SUBJECT: Environmental Clearance Memorandum Todd Wehner Civil Design/Access Roads - TELF-TPP-3 James Semrau Project Manager - TEP-TPP-1 Proposed Action: Wood pole replacement, equipment landing construction, and access road improvements along various transmission lines in Bonneville Power Administration's (BPA) Grand Coulee District. PP&A Project No.: 2152 (Grand Coulee-Chief Joseph No. 1), 2151 (Grand Coulee-Chief Joseph No. 2), 2121 (Grand Coulee-Foster Creek No. 1) and 1776 (Grand Coulee-Okanogan No. 2) Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance Location: Douglas and Okanogan counties, Washington. Refer to table below for project locations: Line Name Structure Township Range Section County

77

Operations and maintenance philosophy  

SciTech Connect (OSTI)

This Operations and Maintenance (O&M) Philosophy document is intended to establish a future O&M vision, with an increased focus on minimizing worker exposure, ensuring uninterrupted retrieval operations, and minimizing operation life-cycle cost. It is intended that this document would incorporate O&M lessons learned into on-going and future project upgrades.

DUNCAN, G.P.

1999-10-28T23:59:59.000Z

78

Preventive Maintenance  

Broader source: Energy.gov [DOE]

Preventive maintenance aims to sustain and/or extend system lifespan through a set of actions that detect, preclude, or mitigate system degradation. These actions are based on either calendar time or machine run time.

79

Predictive Maintenance  

Broader source: Energy.gov [DOE]

Predictive maintenance aims to detect equipment degradation and address problems as they arise. The result indicates potential issues, which are controlled or eliminated prior to any significant system deterioration.

80

(DOE/EIS-0128-SA-02): Supplement Analysis: Los Banos-Gates (Path 15) Transmission line project changes to alignment, access road stream crossing, and basis for Supplemental EIS Determination  

Broader source: Energy.gov (indexed) [DOE]

Los Banos-Gates (Path 15) Transmission Line Project DOE/EIS-0128-SA02 Western Area Power Administration Sierra Nevada Customer Service Region U.S. Department of Energy Changes to Alignment, Access Road Stream Crossing, and Basis for Supplemental Environmental Impact Statement Determination Background The Los Banos-Gates 500-kilovolt Transmission Line project was originally proposed as part of the California-Oregon Transmission Project in the 1980s. These two projects were the subject of a single set of documents prepared in 1986 (draft) and 1988 (final) that served as the Environmental Impact Statement (EIS) under the National Environmental Policy Act and the Environmental Impact Report (EIR) under the California Environmental Quality Act. The EIS is entitled "Final Environmental Impact

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Ed Westcotts photography goes on the road  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the Manhattan Project by famed local photographer Ed Westcott, is going on the road. The Oak Ridge Secret City Photographic History Exhibit consists of selected images from many...

82

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Hygiene Substation Access Road Repairs  

Broader source: Energy.gov (indexed) [DOE]

Hygiene Substation Access Road Repairs Hygiene Substation Access Road Repairs A. Brief Description of Proposal: Western Area Power Administration proposes to repair the access road/driveway into the Hygiene Substation. There is a low spot in the middle of the driveway that impedes maneuvering oflarge maintenance equipment in and out of the yard. Western plans to fill the low spot with road base and crumbled concrete fill. The Hygiene Substation is located in Boulder County, approximately 2 miles northwest of Longmont, CO (T3N, R69W, Sec 18). All proposed construction will occur within the existing, disturbed substation access road/driveway. B. Number and Title of tile Categorical Exclusion Being Applied: (See text in 10 CFR 1021, Subpart D.) BI.3 Routine maintenance activities and custodial services for buildings, structures,

83

Reliability-Centered Maintenance  

Broader source: Energy.gov [DOE]

Reliability-centered maintenance leverages the same practices and technologies of predictive maintenance.

84

WP1 Climate services for road  

E-Print Network [OSTI]

and assessment of existing climate change projections regarding TEN-T needs A2: Development of a common methodology for the production of regional climate projections to provide consistent input data for risk by road authorities related to climate data compared to the RIMAROCC project: especially how

Haak, Hein

85

Grande Ronde Endemic Spring Chinook Salmon Supplementation Project; Lostine River Operations and Maintenance 2004 Smolt Acclimation and Adult Return Report.  

SciTech Connect (OSTI)

The Nez Perce Tribe (NPT), through funding provided by the Bonneville Power Administration (BPA), has implemented a Chinook salmon supplementation program (250,000 smolts) on the Lostine River, a tributary to the Grande Ronde River of Oregon. The Grande Ronde Endemic Spring Chinook Salmon Supplementation project, which involves supplementation of the Upper Grande Ronde River and Catherine Creek in addition to the Lostine River, was established to prevent extirpation and increase the number of threatened Snake River spring/summer Chinook salmon (Oncorhynchus tshawytscha) returning to the Grande Ronde River. This report covers the eighth season (1997-2004) of adult Chinook salmon broodstock collection in the Lostine River and the sixth season (1999-2004) of acclimation of resulting Lostine River progeny. Production of Lostine River spring Chinook salmon smolts currently occurs at Lookingglass Fish Hatchery (LGH). The Lostine River supplementation program utilizes two strategies to obtain egg source for production of smolts for supplementation: captive broodstock and conventional broodstock. The captive broodstock strategy involves (1) capture of natural juvenile spring Chinook salmon smolts from the Lostine River, (2) rearing those to adult and spawning them, and (3) rearing the resultant progeny for eventual acclimation and release back into the Lostine River. The conventional broodstock strategy involves (1) capture of natural and hatchery origin adults returning to the Lostine River, (2) holding those adults and spawning them, and (3) rearing the resultant progency for acclimation and release back into the Lostine River. This report focuses on (1) the trapping and collection of adult spring Chinook salmon that return to the Lostine River, which provides the broodstock source for the conventional strategy and (2) the acclimation and release of juvenile spring Chinook salmon produced from the captive broodstock and conventional broodstock strategies. In 2004, acclimation of Lostine River spring Chinook salmon smolts occurred from March 1, 2004 through to April 14, 2004 and a total of 250,249 smolts were acclimated and released. These smolts were produced from the brood year (BY) 2002 egg source and included captive brood (133,781) and conventional (116,468) origin smolts that were all progeny of Lostine River spring Chinook salmon. Operation of the Lostine River adult monitoring and collection facility in 2004 began May 10, the first Chinook was captured on May 19, 2004 and the last Chinook was captured on September 16, 2004. The weir and trap were removed on October 1, 2004. A total of 1,091 adult Chinook, including jacks, were captured during the season. The composition of the run included 299 natural origin fish and 792 hatchery supplementation fish. There were no identified 'stray' hatchery fish from other programs trapped. Of the fish captured, 46 natural and 69 hatchery supplementation adults were retained for broodstock and transported to Lookingglass Hatchery for holding and spawning, 537 adult Chinook were passed or transported above the weir to spawn naturally, and 447 hatchery origin adult Chinook were transported and outplanted in the Wallowa River and Bear Creek to spawn in underseeded habitat. Of the 107 adults retained (eight additional hatchery females were collected and then later returned to the Lostine River to spawn naturally) for broodstock at Lookingglass Hatchery, 22 natural females and 30 supplementation females were represented in spawning. These females produced a total of 221,889 eggs at fertilization. Eye-up was 94.9% which yielded a total of 210,661 conventional program eyed eggs. The fecundity averaged 4,267 eggs per female. These eggs were incubated and at Lookingglass Hatchery until eyed stage and then transferred to Oxbow Hatchery where they will be reared to the fingerling stage. They will then be transported back to LGH and reared to the smolt stage and then transported to the Lostine acclimation facility for release in the spring of 2006. Captive brood program eggs/fish will be added to

Zollman, Richard L.; Eschler, Russell; Sealey, Shawn [Nez Perce Tribe

2009-03-31T23:59:59.000Z

86

Grande Ronde Endemic Spring Chinook Salmon Supplementation Project; Lostine River Operations and Maintenance 2003 Smolt Acclimation and Adult Return Report.  

SciTech Connect (OSTI)

The Nez Perce Tribe (NPT), through funding provided by the Bonneville Power Administration (BPA), has implemented a Chinook salmon supplementation program (250,000 smolts) on the Lostine River, a tributary to the Grande Ronde River of Oregon. The Grande Ronde Endemic Spring Chinook Salmon Supplementation project, which involves supplementation of the Upper Grande Ronde River and Catherine Creek in addition to the Lostine River, was established to prevent extirpation and increase the number of threatened Snake River spring/summer Chinook salmon (Oncorhynchus tshawytscha) returning to the Grande Ronde River. This report covers the seventh season (1997-2003) of adult Chinook salmon broodstock collection in the Lostine River and the fifth season (1999-2003) of acclimating the resultant progeny. Production of Lostine River spring Chinook salmon smolts currently occurs at Lookingglass Fish Hatchery (LGH). The Lostine River supplementation program utilizes two strategies to obtain egg source for production of smolts for supplementation: captive broodstock and conventional broodstock. The captive broodstock strategy involves (1) capture of natural juvenile spring Chinook salmon smolts from the Lostine River, (2) rearing those to adult and spawning them, and (3) rearing the resultant progeny for eventual acclimation and release back into the Lostine River. The conventional broodstock strategy involves (1) capture of natural and hatchery origin adults returning to the Lostine River, (2) holding those adults and spawning them, and (3) rearing the resultant progeny for acclimation and release back into the Lostine River. This report focuses on (1) the trapping and collection of adult spring Chinook salmon that return to the Lostine River, which provides the broodstock source for the conventional strategy and (2) the acclimation and release of juvenile spring Chinook salmon produced from the captive broodstock and conventional broodstock strategies. In 2003, acclimation of Lostine River spring Chinook salmon smolts occurred from March 3, 2003 through to April 14, 2003 and a total of 242,776 smolts were acclimated and released. These smolts were produced from the brood year (BY) 2001 egg source and included captive broodstock (141,860) and conventional broodstock (100,916) origin smolts that were all progeny of Lostine River spring Chinook salmon. Operation of the Lostine River adult monitoring and collection facility in 2003 began April 30th, the first Chinook was captured on May 16, 2003 and the last Chinook was captured on September 21, 2003. The weir and trap were removed on October 1, 2003. A total of 464 adult Chinook, including jacks, were captured during the season. The composition of the run included 239 natural origin fish and 225 hatchery supplementation fish. There were no identified 'stray' hatchery fish from other programs trapped. Of the fish captured, 45 natural and 4 hatchery supplementation adults were retained for broodstock and transported to LGH for holding and spawning, 366 adult Chinook were passed or transported above the weir to spawn naturally, and 49 hatchery origin adult jack Chinook were transported and outplanted in the Wallowa River and Bear Creek to spawn in underseeded habitat. Of the 49 adults retained for broodstock at Lookingglass Hatchery, 21 natural females and no hatchery origin females were represented in spawning. These females produced a total of 106,609 eggs at fertilization. Eye-up was 95.50% which yielded a total of 101,811 conventional program eyed eggs. The fecundity averaged 5,077 eggs per female. These eggs were incubated and at Lookingglass Hatchery until eyed stage. At eye they were transferred to Oxbow Hatchery where they were reared to the fingerling state at which time they were transported back to LGH until they were smolts in the spring of 2005. Captive brood program eggs/fish will be added to the conventional program eggs to make up the entire juvenile release for the Lostine River program in 2005.

Zollman, Richard L.; Eschler, Russell; Sealey, Shawn [Nez Perce Tribe

2009-03-31T23:59:59.000Z

87

Grande Ronde Endemic Spring Chinook Salmon Supplementation Project; Lostine River Operations and Maintenance 2007 Smolt Acclimation and Adult Return Report.  

SciTech Connect (OSTI)

The Nez Perce Tribe (NPT), through funding provided by the Bonneville Power Administration (BPA), has implemented a Chinook salmon supplementation program (250,000 smolts) on the Lostine River, a tributary to the Grande Ronde River of Oregon. The Grande Ronde Endemic Spring Chinook Salmon Supplementation project, which involves supplementation of the Upper Grande Ronde River and Catherine Creek in addition to the Lostine River, was established to prevent extirpation and increase the number of threatened Snake River spring/summer Chinook salmon (Oncorhynchus tshawytscha) returning to the Grande Ronde River. This report covers the eleventh season (1997-2007) of adult Chinook salmon broodstock collection in the Lostine River and the ninth season (1999-2007) of acclimation of resulting Lostine River progeny. Production of Lostine River spring Chinook salmon smolts currently occurs at Lookingglass Fish Hatchery (LGH). The Lostine River supplementation program utilizes two strategies to obtain egg source for production of smolts for supplementation: captive broodstock and conventional broodstock. The captive broodstock strategy involves (1) capture of natural juvenile spring Chinook salmon smolts from the Lostine River, (2) rearing those to adult and spawning them, and (3) rearing the resultant progeny for eventual acclimation and release back into the Lostine River. The conventional broodstock strategy involves (1) capture of natural and hatchery origin adults returning to the Lostine River, (2) holding those adults and spawning them, and (3) rearing the resultant progeny for acclimation and release back into the Lostine River. This report focuses on (1) the trapping and collection of adult spring Chinook salmon that return to the Lostine River, which provides the broodstock source for the conventional strategy and (2) the acclimation and release of juvenile spring Chinook salmon produced from the captive broodstock and conventional broodstock strategies In 2007, acclimation of Lostine River spring Chinook salmon smolts occurred from 3/5/07 through to 4/17/07 and a total of 230,010 smolts were acclimated and released. These smolts were produced from the brood year (BY) 2005 egg source and included captive brood (24,604) and conventional (205,406) origin smolts that were all progeny of Lostine River spring Chinook salmon. Operation of the Lostine River adult monitoring and collection facility in 2007 began May 14th. The first Chinook was captured on June 2, 2007 and the last Chinook was captured on September 25, 2007. The weir and trap were removed on October 1, 2007. A total of 637 adult Chinook, including jacks, were captured during the season. The composition of the run included 240 natural origin fish and 397 hatchery supplementation fish. There were no identified 'stray' hatchery fish from other programs trapped. Of the fish captured, 41 natural and 81 hatchery supplementation adults were retained for broodstock and transported to LGH for holding and spawning, 403 adult Chinook were passed or transported above the weir to spawn naturally, and only hatchery origin jack Chinook were transported and outplanted in the Wallowa River and Bear Creek in underseeded habitat. Of the 122 adult fish retained for broodstock, 20 natural females and 40 supplementation females were represented in spawning. The eggs from these females produced a total of 267,350 eggs at fertilization. Eye-up was 86.73% which yielded a total of 231,882 conventional program eyed eggs. The fecundity averaged 4,456 eggs per female. These eggs will be incubated and reared at Lookingglass Hatchery until they are smolts in the spring of 2009. Captive brood program eggs/fish will be added to the conventional program eggs to make up the entire juvenile release for the Lostine River program in 2009. Due to the success of the 2007 egg collection, the number of fish produced exceeded program needs and facility capabilities. As a result, there are plans to outplant fry in 2008 and parr in early 2009 to underseeded habitat in the Wallowa River.

Zollman, Richard L.; Eschler, Russell; Sealey, Shawn [Nez Perce Tribe

2009-03-31T23:59:59.000Z

88

Grande Ronde Endemic Spring Chinook Salmon Supplementation Project; Lostine River Operations and Maintenance 2006 Smolt Acclimation and Adult Return Report.  

SciTech Connect (OSTI)

The Nez Perce Tribe (NPT), through funding provided by the Bonneville Power Administration (BPA), has implemented a Chinook salmon supplementation program (250,000 smolts) on the Lostine River, a tributary to the Grande Ronde River of Oregon. The Grande Ronde Endemic Spring Chinook Salmon Supplementation project, which involves supplementation of the Upper Grande Ronde River and Catherine Creek in addition to the Lostine River, was established to prevent extirpation and increase the number of threatened Snake River spring/summer Chinook salmon (Oncorhynchus tshawytscha) returning to the Grande Ronde River. This report covers the tenth season (1997-2006) of adult Chinook salmon broodstock collection in the Lostine River and the eighth season (1999-2006) of acclimation of resulting Lostine River progeny. Production of Lostine River spring Chinook salmon smolts currently occurs at Lookingglass Fish Hatchery (LGH). The Lostine River supplementation program utilizes two strategies to obtain egg source for production of smolts for supplementation: captive broodstock and conventional broodstock. The captive broodstock strategy involves (1) capture of natural juvenile spring Chinook salmon smolts from the Lostine River, (2) rearing those to adult and spawning them, and (3) rearing the resultant progeny for eventual acclimation and release back into the Lostine River. The conventional broodstock strategy involves (1) capture of natural and hatchery origin adults returning to the Lostine River, (2) holding those adults and spawning them, and (3) rearing the resultant progeny for acclimation and release back into the Lostine River. This report focuses on (1) the trapping and collection of adult spring Chinook salmon that return to the Lostine River, which provides the broodstock source for the conventional strategy and (2) the acclimation and release of juvenile spring Chinook salmon produced from the captive broodstock and conventional broodstock strategies In 2006, acclimation of Lostine River spring Chinook salmon smolts occurred from February 27, 2006 through to April 10, 2006 and a total of 240,568 smolts were acclimated and released. These smolts were produced from the brood year (BY) 2004 egg source and included captive brood (40,982) and conventional (199,586) origin smolts that were all progeny of Lostine River spring Chinook salmon. Operation of the Lostine River adult monitoring and collection facility in 2006 began May 15th, the first Chinook was captured on June 14, 2006 and the last Chinook was captured on September 27, 2006. The weir and trap were removed on October 1, 2006. A total of 534 adult Chinook, including jacks, were captured during the season. The composition of the run included 205 natural origin fish and 329 hatchery supplementation fish. There were no identified 'stray' hatchery fish from other programs trapped. Of the fish captured, 33 natural and 120 hatchery supplementation adults were retained for broodstock and transported to LGH for holding and spawning and 397 adult Chinook were passed or transported above the weir to spawn naturally. In 2006, no hatchery origin adult Chinook were transported and out planted in the Wallowa River and Bear Creek to spawn in under seeded habitat. In order to meet egg take goals for the conventional portion of the program, a determination was made that approximately 147 adults were needed for broodstock. As a result 16 (8 males and 8 females) of the 153 fish collected for broodstock were returned to the Lostine River to spawn naturally. Females that were spawned and provided the brood source were made up of 12 natural females and 45 supplementation females. One of these females tested positive for high levels of Bacterial Kidney Disease and consequently this females eggs were destroyed. The remaining females produced a total of 241,372 eggs at fertilization. Eye-up was 85.47% which yielded a total of 206,309 conventional program eyed eggs. The fecundity averaged 4,162 eggs per female. The brood year 2006 eggs will be incubated and reared at Lookingglass Hatchery until

Zollman, Richard L.; Eschler, Russell; Sealey, Shawn [Nez Perce Tribe

2009-03-31T23:59:59.000Z

89

East Avenue Truck Inspection Patterson Pass Road Vasco Road  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Vasco Road Thunderbird Lane Greenville Road Greenville Road Directions to the SandiaCA - Visitor Badge Office Interstate 580 - OaklandSan Francisco, Traveling Eastbound * Exit...

90

Forest Roads (Minnesota)  

Broader source: Energy.gov [DOE]

Proposed forest roads must be approved and designated by the Commissioner of the Department of Natural Resources.

91

Scott Stadium Stadium Road  

E-Print Network [OSTI]

Scott Stadium Stadium Road Residence Hereford College Alderman Road Residence Area Aquatic Increase Service to the Corner I0 750 1,500375 Feet Coordinate System: NAD 1983 StatePlane Virginia South 2: 36.7667 Latitude Of Origin: 36.3333 Units: Foot US #12;Scott Stadium Stadium Road Residence

Acton, Scott

92

University Marketing Communications UMC Web Site Maintenance Service  

E-Print Network [OSTI]

University Marketing Communications UMC Web Site Maintenance Service Overview Content management and ongoing Web site maintenance is an essential part of any Web project plan. When developing a new Web site in Web maintenance activities. Benefits Our Web maintenance service gives you ongoing access to our group

Sibille, Etienne

93

EA-1697: San Joaquin Valley Right-of-Way Project, California | Department  

Broader source: Energy.gov (indexed) [DOE]

97: San Joaquin Valley Right-of-Way Project, California 97: San Joaquin Valley Right-of-Way Project, California EA-1697: San Joaquin Valley Right-of-Way Project, California Summary DOE's Western Area Power Administration is preparing this EA to evaluate the environmental impacts of right-of-way maintenance (including facility inspection and repair, vegetation management, and equipment upgrades for transmission lines and associated rights-or-way, access roads, substations, and a maintenance facility) in the San Joaquin Valley in California. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download December 2, 2011 EA-1697: Finding of No Significant Impact Right-of-Way Maintenance in the San Joaquin Valley, California December 2, 2011 EA-1697: Final Environmental Assessment

94

Portable Power Projects  

Broader source: Energy.gov [DOE]

DOE's Portable Power, Auxiliary Power Units, and R&D for Off-Road Fuel Cell Applications Research Projects Awarded April 2004

95

Operations and Maintenance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Operations and Maintenance Operations and Maintenance Operations and Maintenance October 16, 2013 - 5:01pm Addthis Project Construction Commissioning Operations & Maintenance Operations and maintenance (O&M) programs are critical to successfully integrating renewable energy into new Federal building construction and major renovations. This overview covers the importance of O&M programs for renewable energy projects, creating a successful O&M program, and identifying the right team to carry out the program. It highlights typical renewable energy issues and recommends following the design, specifications, and recommendations from product manufacturers. Key Actions in Operations and Maintenance Make O&M a priority to protect agency investment. Include O&M input in design reviews.

96

Landlord project multi-year program plan, fiscal year 1999, WBS 1.5  

SciTech Connect (OSTI)

The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The mission of Landlord Project is to provide more maintenance replacement of general infrastructure facilities and systems to facilitate the Hanford Site cleanup mission. Also, once an infrastructure facility or system is no longer needed the Landlord Project transitions the facility to final closure/removal through excess, salvage or demolition. Landlord Project activities will be performed in an environmentally sound, safe, economical, prudent, and reliable manner. The Landlord Project consists of the following facilities systems: steam, water, liquid sanitary waste, electrical distribution, telecommunication, sanitary landfill, emergency services, general purpose offices, general purpose shops, general purpose warehouses, environmental supports facilities, roads, railroad, and the site land. The objectives for general infrastructure support are reflected in two specific areas, (1) Core Infrastructure Maintenance, and (2) Infrastructure Risk Mitigation.

Dallas, M.D.

1998-09-22T23:59:59.000Z

97

Road Accidents and Research  

Science Journals Connector (OSTI)

... of speed); later still to lack of care in all road users without exception (pedestrians, cyclists and drivers), that is, the whole community. Before blaming the 'human ... to probe into such other accident causes as the varying number of traffic units including pedestrians brought on to the roads by more hours of sunshine. Two drought years increased ...

MERVYN O'GORMAN

1944-05-20T23:59:59.000Z

98

Hazards of the Road  

Science Journals Connector (OSTI)

... judges), the meeting considered its subject, under four main headings: the driver, the pedestrian, the vehicle and the road. No doubt remained at the conclusion that the fitness ... 1949 (when the Road Research Laboratory first prepared comprehensive records) and 1961, casualties to pedestrians have been increasing as traffic increased but not in direct proportion. On the other ...

DAVID NAPLEY

1962-09-29T23:59:59.000Z

99

Predictive Maintenance Technologies  

Broader source: Energy.gov [DOE]

Several diagnostic technologies and best practices are available to assist Federal agencies with predictive maintenance programs.

100

USVI Energy Road Map: Charting the Course to a Clean Energy Future...  

Broader source: Energy.gov (indexed) [DOE]

Islands pilot project road map, including over-arching goals, organization, strategy, technology-specific goals and accomplishments, challenges, solutions, and upcoming...

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Current status of MHI CO2 capture plant technology, large scale demonstration project and road map to commercialization for coal fired flue gas application  

Science Journals Connector (OSTI)

(1) It is becoming increasingly evident that the prolonged utilization of fossil fuels for primary energy production, especially coal which is relatively cheap and abundant, is inevitable and that Carbon Capture and Storage (CCS) technology can significantly reduce CO2 emissions from this sector thus allowing the continued environmentally sustainable use of this important energy commodity on a global basis. (2) MHI has co-developed the Kansai Mitsubishi Carbon Dioxide Recovery Process (KM-CDR Process) and KS-1 absorbent, which has been deployed in seven CO2 capture plants, now under commercial operation operating at a CO2 capture capacity of 450 metric tons per day (tpd). In addition, a further two commercial plants are now under construction all of which capture CO2 from natural gas fired flue gas boilers and steam reformers. Accordingly this technology is now available for commercial scale CO2 capture for gas boiler and gas turbine application. (3) However before offering commercial CO2 capture plants for coal fired flue gas application, it is necessary to verify the influence of, and develop countermeasures for, related impurities contained in coal fired flue gas. This includes the influence on both the absorbent and the entire system of the CO2 capture plant to achieve high operational reliability and minimize maintenance requirements. (4) Preventing the accumulation of impurities, especially the build up of dust, is very important when treating coal fired flue gas and MHI has undertaken significant work to understand the impact of impurities in order to achieve reliable and stable operating conditions and to efficiently optimize integration between the CO2 capture plant, the coal fired power plant and the flue gas clean up equipment. (5) To achieve this purpose, MHI constructed a 10 tpd CO2 capture demonstration plant at the Matsushima 1000MW Power Station and confirmed successful, long term demonstration following ?5000hours of operation in 200607 with 50% financial support by RITE, as a joint program to promote technological development with the private sector, and cooperation from J-POWER. (6) Following successful demonstration testing at Matsushima, additional testing was undertaken in 2008 to examine the impact of entrainment of higher levels of flue gas impurities (primarily \\{SOx\\} and dust by bypassing the existing FGD) and to determine which components of the CO2 recovery process are responsible for the removal of these impurities. Following an additional 1000 demonstration hours, results indicated stable operational performance in relation to the following impurities; (1) SO2: Even at higher SO2 concentrations were almost completely removed from the flue gas before entering the CO2 absorber. (2) Dust: The accumulation of dust in the absorbent was higher, leading to an advanced understanding of the behavior of dust in the CO2 capture plant and the dust removal efficiency of each component within the CO2 recovery system. The data obtained is useful for the design of large-scale units and confirms the operating robustness of the CO2 capture plant accounting for wide fluctuations in impurity concentrations. (7) This important coal fired flue gas testing showed categorically that minimizing the accumulation of large concentrations of impurities, and to suppress dust concentrations below a prescribed level, is important to achieve long-term stable operation and to minimize maintenance work for the CO2 capture plant. To comply with the above requirement, various countermeasures have been developed which include the optimization of the impurity removal technology, flue gas pre treatment and improved optimization with the flue gas desulfurization facility. (8) In case of a commercial scale CO2 capture plant applied for coal fired flue gas, its respective size will be several thousand tpd which represents a considerable scale-up from the 10 tpd demonstration plant. In order to ensure the operational reliability and to accurately confirm the influence and the behavior of the impurities in coal fired fl

Takahiko Endo; Yoshinori Kajiya; Hiromitsu Nagayasu; Masaki Iijima; Tsuyoshi Ohishi; Hiroshi Tanaka; Ronald Mitchell

2011-01-01T23:59:59.000Z

102

Visibility and Road Accidents  

Science Journals Connector (OSTI)

... road accidents from a very unusual point of view. These writers investigated the beliefs of pedestrians regarding their own visibility, to see how far these beliefs compared with their actual ... drive.

1940-11-23T23:59:59.000Z

103

DATA SHARING REPORT CHARACTERIZATION OF POPULATION 7: PERSONAL PROTECTIVE EQUIPMENT, DRY ACTIVE WASTE, AND MISCELLANEOUS DEBRIS, SURVEILLANCE AND MAINTENANCE PROJECT OAK RIDGE NATIONAL LABORATORY OAK RIDGE, TENNESSEE  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) Oak Ridge Office of Environmental Management (EM-OR) requested that Oak Ridge Associated Universities (ORAU), working under the Oak Ridge Institute for Science and Education (ORISE) contract, provide technical and independent waste management planning support under the American Recovery and Reinvestment Act (ARRA). Specifically, DOE EM-OR requested that ORAU plan and implement a sampling and analysis campaign targeting certain URS|CH2M Oak Ridge, LLC (UCOR) surveillance and maintenance (S&M) process inventory waste. Eight populations of historical and reoccurring S&M waste at the Oak Ridge National Laboratory (ORNL) have been identified in the Waste Handling Plan for Surveillance and Maintenance Activities at the Oak Ridge National Laboratory, DOE/OR/01-2565&D2 (WHP) (DOE 2012) for evaluation and processing to determine a final pathway for disposal. Population 7 (POP 7) consists of 56 containers of aged, low-level and potentially mixed S&M waste that has been staged in various locations around ORNL. Several of these POP 7 containers primarily contain personal protective equipment (PPE) and dry active waste (DAW), but may contain other miscellaneous debris. This data sharing report addresses the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) specified waste in a 13-container subpopulation (including eight steel boxes, three 55-gal drums, one sealand, and one intermodal) that lacked sufficient characterization data for possible disposal at the Environmental Management Waste Management Facility (EMWMF) using the approved Waste Lot (WL) 108.1 profile.

Harpenau, Evan M

2013-10-10T23:59:59.000Z

104

Reliability-based maintenance evaluations and standard preventive maintenance programs  

SciTech Connect (OSTI)

Due to recent issuance of 10CFR50.65, the U.S. Nuclear Regulatory Commission maintenance rule (Rule), and the [open quotes]Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants[close quotes] prepared by the Nuclear Management and Resources Council, many utilities are undertaking review or evaluation of current preventive maintenance (PM) programs. Although PM optimization and documentation are not specifically required by the Rule, an appropriate and effective PM program (PMP) will be the cornerstone of the successful and cost-effective implementation of the Rule. Currently, a project is being conducted at the Vermont Yankee Nuclear Power Station (VYNPS) in conjunction with Quadrex Energy Services to evaluate, optimize, and document the PMP. The project began in March 1993 and is scheduled for completion in mid-1995. The initial scope for the project is the evaluation of those structures, systems, and components that are within the scope of the Rule. Because of the number of systems to be evaluated ([approximately]50), the desired completion schedule, and cost considerations, a streamlined approach to PM optimization and documentation is being utilized.

Varno, M. (Vermont Yankee Nuclear Power Corp., Vernon, VT (United States)); McKinley, M. (Quadrex Energy Services Corp., Campbell, CA (United States))

1993-01-01T23:59:59.000Z

105

Computerized Maintenance Management Systems  

Broader source: Energy.gov [DOE]

Computerized maintenance management systems (CMMS) are a type of management software that perform functions in support of operations and maintenance (O&M) programs. The software automates most of the logistical functions performed by O&M staff.

106

The Road to 2010  

Broader source: Energy.gov (indexed) [DOE]

Road to 2010 Road to 2010 Addressing the nuclear question in the twenty first century July 2009 The Road to 2010 Addressing the nuclear question in the twenty first century Presented to Parliament by the Prime Minister, by Command of Her Majesty July 2009 Cm 7675 £14.35 Photograph on page 16 by EDF; © EDF Photograph on page 20 by BNFL; © BNFL, image from www.IAEA.org Photograph on page 26 by British Army; © Crown copyright/MoD, image from www.photos.mod.uk Photograph on page 34 by CTBTO; © CTBTO Preparatory Commission, image from www.CTBTO.org Photograph on pages 42 and 45 by Dean Calma; © Dean Calma, image from www.IAEA.org © Crown Copyright 2009 The text in this document (excluding the Royal Arms and other departmental or agency logos) may be reproduced free of

107

EA-1966: Sunflower Wind Project, Hebron, North Dakota | Department of  

Broader source: Energy.gov (indexed) [DOE]

6: Sunflower Wind Project, Hebron, North Dakota 6: Sunflower Wind Project, Hebron, North Dakota EA-1966: Sunflower Wind Project, Hebron, North Dakota SUMMARY Western Area Power Administration (Western) is preparing an EA to evaluate potential environmental impacts of interconnecting a proposed 80 MW generating facility south of Hebron in Morton and Stark Counties, North Dakota. The proposed wind generating facility of 30-50 wind turbines would encompass approximately 9,000 acres. Ancillary facilities would include an underground collection line system, a project substation, one mile of new transmission line, a new switchyard facility on the existing Dickinson-Mandan 230 kV line owned and operated by Western, one permanent meteorological tower, new access roads, and an operations and maintenance building.

108

Rapid road repair vehicle  

DOE Patents [OSTI]

Disclosed are improvments to a rapid road repair vehicle comprising an improved cleaning device arrangement, two dispensing arrays for filling defects more rapidly and efficiently, an array of pre-heaters to heat the road way surface in order to help the repair material better bond to the repaired surface, a means for detecting, measuring, and computing the number, location and volume of each of the detected surface imperfection, and a computer means schema for controlling the operation of the plurality of vehicle subsystems. The improved vehicle is, therefore, better able to perform its intended function of filling surface imperfections while moving over those surfaces at near normal traffic speeds.

Mara, Leo M. (Livermore, CA)

1999-01-01T23:59:59.000Z

109

An Approach to Produce a GIS Database for Road Surface Monitoring  

Science Journals Connector (OSTI)

Abstract Road Surface Monitoring (RSM) is the process of detecting the distress on paved or unpaved road surfaces. The primary aim of this process is to detect any distress (such as road surface cracks) at early stages in order to apply maintenance on time. Early detection of road cracks can assist maintenance before the repair costs becomes too high. Local authorities should have an effective and easy to use monitoring process in place across the road network to meet their obligations. The process of adding geographical identification metadata to the photos is called Geo-tagging. The proposed method in this work entails capturing GPS information when the photo is taken for the road surface distress, then attaching the photo to a map. The location disclosure in the act of geo-tagging of a photo provides qualities to the digital map. In that respect, a specific richness of the GIS dataset arises when they disclose the road surface distress photos. This paper proposes a system for establishing a GIS database consisting of geo-tagged photos for local authorities to automate the process of recording and reporting road surface distresses. This system is easy to use, cost-effective, deployable, and can be used effectively by local authorities.

Karwan Ghazi Fendi; Sarhat Mustafa Adam; Nick Kokkas; Martin Smith

2014-01-01T23:59:59.000Z

110

Predictive Maintenance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Maintenance Maintenance Predictive Maintenance October 7, 2013 - 9:46am Addthis Predictive maintenance aims to detect equipment degradation and address problems as they arise. The result indicates potential issues, which are controlled or eliminated prior to any significant system deterioration. Predictive maintenance differs from preventive maintenance because maintenance is based on the condition of the machine instead of a preset schedule. This eliminates the unneeded maintenance concerns of preventive programs. Several predictive maintenance technologies are available. Federal agencies can leverage a combination of these technologies within their maintenance programs. Advantages A well-executed predictive maintenance program can almost eliminate catastrophic equipment failure because issues are identified and eliminated

111

Research and Road Traffic  

Science Journals Connector (OSTI)

... been advocated for Great Britain within my knowledge, deserve other than the fervent opposition of pedestrians as well as motorists. They can do nothing for safety?they do not discover ... relate the number of road fatalities in a place to the amount of traffic flow (pedestrian and other) there. It would establish at an early moment the machinery for measuring ...

MERVYN O'GORMAN

1934-09-01T23:59:59.000Z

112

On the Road with ARPA-E | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

On the Road with ARPA-E On the Road with ARPA-E On the Road with ARPA-E September 23, 2010 - 12:29pm Addthis ARPA-E Director Dr. Arun Majumdar and MSU Project Lead Dr. Norbert Mueller test the wave disk engine. ARPA-E Director Dr. Arun Majumdar and MSU Project Lead Dr. Norbert Mueller test the wave disk engine. Dr. Arun Majumdar Dr. Arun Majumdar Former Director, Advanced Research Projects Agency - Energy Auto enthusiasts should be forewarned that this post may make you jealous. I say that because earlier this month I traveled to Michigan to visit two projects ARPA-E is currently funding - one at Michigan State University (MSU), the second at General Motors (GM), and got an up close look at several innovative transportation-related energy advancements. While at MSU, I had the op portunity to tour the facility where the wave

113

Home Maintenance Manual.  

E-Print Network [OSTI]

. College Station , Texas l Introduction A regular program of maintenance inspections can help homeowners identify and correct problems before they become serious. Unfortunately, a maintenance problem ignored becomes a major repair. Preventive... maintenance can extend the life of materials and equipment and will be less expensive in the long run than replacement. Maintaining a home need not be difficult, but it requires a regular program of inspection to identify and correct problems before...

Anonymous,

1985-01-01T23:59:59.000Z

114

Operation and Maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

hosted by Western and requires a digital certificate and login for full access.) Contact Information Transmission Planning Western OATT Revision Maintenance Services Meter Policy...

115

HVAC Maintenance and Technologies  

Broader source: Energy.gov [DOE]

Presentation covers the HVAC maintenance and technologies, and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Providence, Rhode Island.

116

Tweets on the road  

E-Print Network [OSTI]

The pervasiveness of mobile devices, which is increasing daily, is generating a vast amount of geo-located data allowing us to gain further insights into human behaviors. In particular, this new technology enables users to communicate through mobile social media applications, such as Twitter, anytime and anywhere. Thus, geo-located tweets offer the possibility to carry out in-depth studies on human mobility. In this paper, we study the use of Twitter in transportation by identifying tweets posted from roads and rails in Europe between September 2012 and November 2013. We compute the percentage of highway and railway segments covered by tweets in 39 countries. The coverages are very different from country to country and their variability can be partially explained by differences in Twitter penetration rates. Still, some of these differences might be related to cultural factors regarding mobility habits and interacting socially online. Analyzing particular road sectors, our results show a positive correlation b...

Lenormand, Maxime; Colet, Pere; Ramasco, Jos J

2014-01-01T23:59:59.000Z

117

Johnson Creek Artificial Propagation and Enhancement Project Operations and Maintenance Program; Brood Year 2000: Johnson Creek Chinook Salmon Supplementation, Biennial Report 2000-2002.  

SciTech Connect (OSTI)

The Nez Perce Tribe, through funding provided by the Bonneville Power Administration, has implemented a small scale chinook salmon supplementation program on Johnson Creek, a tributary in the South Fork of the Salmon River, Idaho. The Johnson Creek Artificial Propagation Enhancement project was established to enhance the number of threatened Snake River summer chinook salmon (Oncorhynchus tshawytscha) returning to Johnson Creek through artificial propagation. Adult chinook salmon trapping, broodstock selection, and spawning was first implemented in 1998, did not occur in 1999, and was resumed in 2000. A total of 152 salmon were trapped in Johnson Creek in 2000, of which 73 (25 males, 16 females, and 32 jacks) fish were transported to Idaho Fish and Game=s South Fork Salmon River adult holding and spawning facility for artificial propagation purposes. The remaining 79 (29 males, 16 females, and 24 jacks) fish were released above the weir to spawn naturally. A total of 65,060 green eggs were taken from 16 female salmon and transported to the McCall Fish Hatchery for incubation and rearing. Egg counts indicated an average eye-up rate of 86.0% for 55,971 eyed eggs. Average fecundity for Johnson Creek females was 4,066 eggs per female. Juvenile fish were reared indoors at the McCall Fish Hatchery through November 2001. These fish were transferred to outdoor rearing facilities in December 2001 where they remained until release in March 2002. All of these fish were marked with Coded Wire Tags and Visual Implant Elastomer tags. In addition 9,987 were also PIT tagged. Hand counts provided by marking crews were used to amend the number of juvenile salmon released from the original egg count. A total of 57,392 smolts were released into a temporary acclimation channel in Johnson Creek on March 18, 19, 20, 2002. These fish were held in this facility until a fish screen was removed on March 22, 2002 and the fish were allowed to emigrate.

Daniel, Mitch; Gebhards, John; Hill, Robert

2003-05-01T23:59:59.000Z

118

Duck Valley Reservoirs Fish Stocking and Operation and Maintenance, 2005-2006 Annual Progress Report.  

SciTech Connect (OSTI)

The Duck Valley Reservoirs Fish Stocking and Operations and Maintenance (DV Fisheries) project is an ongoing resident fish program designed to enhance both subsistence fishing, educational opportunities for Tribal members of the Shoshone-Paiute Tribes, and recreational fishing facilities for non-Tribal members. In addition to stocking rainbow trout (Oncorhynchus mykiss) in Mountain View, Lake Billy Shaw, and Sheep Creek Reservoirs, the program also intends to afford and maintain healthy aquatic conditions for fish growth and survival, to provide superior facilities with wilderness qualities to attract non-Tribal angler use, and to offer clear, consistent communication with the Tribal community about this project as well as outreach and education within the region and the local community. Tasks for this performance period are divided into operations and maintenance plus monitoring and evaluation. Operation and maintenance of the three reservoirs include fences, roads, dams and all reservoir structures, feeder canals, water troughs and stock ponds, educational signs, vehicles and equipment, and outhouses. Monitoring and evaluation activities included creel, gillnet, wildlife, and bird surveys, water quality and reservoir structures monitoring, native vegetation planting, photo point documentation, control of encroaching exotic vegetation, and community outreach and education. The three reservoirs are monitored in terms of water quality and fishery success. Sheep Creek Reservoir was the least productive as a result of high turbidity levels and constraining water quality parameters. Lake Billy Shaw trout were in poorer condition than in previous years potentially as a result of water quality or other factors. Mountain View Reservoir trout exhibit the best health of the three reservoirs and was the only reservoir to receive constant flows of water.

Sellman, Jake; Dykstra, Tim [Shoshone-Paiute Tribes

2009-05-11T23:59:59.000Z

119

Operations and Maintenance Manual | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Manual Manual Operations and Maintenance Manual October 16, 2013 - 5:00pm Addthis Closeout of the construction phase for renewable energy projects includes the creation of a comprehensive operations and maintenance (O&M) manual. Although specific content varies depending on the size, scope, and complexity of the project, the O&M manual typically includes manufacturer literature, basic operating procedures, troubleshooting techniques, measurement and verification (M&V) system documentation, and maintenance information. The general contractor should compile O&M documentation, gather as-built drawings for equipment and systems, and take the lead in organizing the manual. The commissioning agent reviews the manual to verify that it includes all necessary documentation, including:

120

ADEC II Universal SCR Retrofit System for On-road and Off-road...  

Broader source: Energy.gov (indexed) [DOE]

ADEC II Universal SCR Retrofit System for On-road and Off-road Diesel Engines ADEC II Universal SCR Retrofit System for On-road and Off-road Diesel Engines Presentation given at...

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Exploring the Standard Model Exploring the Standard Model       You've heard a lot about the Standard Model and the pieces are hopefully beginning to fall into place. However, even a thorough understanding of the Standard Model is not the end of the story but the beginning. By exploring the structure and details of the Standard Model we encounter new questions. Why do the most fundamental particles have the particular masses we observe? Why aren't they all symmetric? How is the mass of a particle related to the masses of its constituents? Is there any other way of organizing the Standard Model? The activities in this project will elucidate but not answer our questions. The Standard Model tells us how particles behave but not necessarily why they do so. The conversation is only beginning. . . .

122

Sally Johnson 123 Bakers Road  

E-Print Network [OSTI]

Sally Johnson 123 Bakers Road Nashville, TN 37212 203-333-4444 Sally.johnson@vanderbilt.edu Leslie. Sincerely, (signature) Sally Johnson #12;

Bordenstein, Seth

123

Sundial Substation Site Baxter Road Substation Site Casey Road  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Sundial Substation Site Baxter Road Substation Site Casey Road Substation Site Monahan Creek Substation Site YALE DAM MERWIN DAM S i l v e r L a k e Lake Merwin Y a l e L a k e V a...

124

ROAD POLISHING ASSESSMENT METHODOLOGY (TROWS) PIARC XXIIND WORLD ROAD CONGRESS  

E-Print Network [OSTI]

depend non-linearly on numerous parameters, like materials used, vehicle and road usage, environmental conditions (e.g., temperature) and many others. Due to their many economic and ecological implications in the same test conditions. On the road circuit, Passenger Car (PC) and Heavy Goods Vehicle (HGV) equipped

Paris-Sud XI, Université de

125

Operations and Maintenance Program Structure  

Broader source: Energy.gov [DOE]

The Federal Energy Management Program recommends Federal operations and maintenance (O&M) programs comprise of five distinct functions: operations, maintenance, engineering, training, and...

126

Seasonal Landscape Maintenance  

E-Print Network [OSTI]

Seasonal Landscape Maintenance Oklahoma State University, in compliance with Title VI and VII State University's Department of Horticulture and Landscape Architecture and Oklahoma Cooperative to dry between watering allows plants to develop stronger, deeper roots. However, some landscape plants

Balasundaram, Balabhaskar "Baski"

127

Associate Vice Chancellor Maintenance  

E-Print Network [OSTI]

Engineering Capital Planning & Design Carpentry Shop Electrical Shop Plumbing Shop HVAC Shop Housing Shop Equipment & Vehicle Maintenance Warehouse Vehicle Pool Shuttle Post Office Parking Services Contract Management Water Distribution Heat & Power Generation Heat Distribution Power Distribution December 2012

Hartman, Chris

128

Operations and Maintenance  

Broader source: Energy.gov [DOE]

Lower operations and maintenance (O&M) costs are critical to reducing a solar system's lifecycle cost of ownership. O&M costs are influenced by up-front investments in design, engineering,...

129

Electricity for road transport, flexible power systems and wind power  

Open Energy Info (EERE)

road transport, flexible power systems and wind power road transport, flexible power systems and wind power (Smart Grid Project) Jump to: navigation, search Project Name Electricity for road transport, flexible power systems and wind power Country Denmark Coordinates 56.26392°, 9.501785° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":56.26392,"lon":9.501785,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

130

The road to rack and ruin: selecting deleterious mitochondrial DNA variants  

Science Journals Connector (OSTI)

...Maintenance and evolution of mtDNA compiled and edited by Duur K. Aanen, Johannes N. Spelbrink and Madeleine Beekman The road to rack and ruin: selecting deleterious mitochondrial DNA variants Ian J. Holt 1 Dave Speijer 2 Thomas B. L. Kirkwood 3 e-mail...

2014-01-01T23:59:59.000Z

131

National Geothermal Data System Architecture Design, Testing and Maintenance  

Broader source: Energy.gov [DOE]

Project objective: To create the National Geothermal Data System (NGDS) comprised of a core and distributed network of databases and data sites that will comprise a federated system for acquisition, management, maintenance, and dissemination of geothermal and related data.

132

Diesel Engines for Road Transport  

Science Journals Connector (OSTI)

... A REMARKABLE revolution is taking place in the type of engine used in large motor vehicles, and by some it is thought that for road ... motor vehicles, and by some it is thought that for road transport the highspeed oil engine is destined to supersede the long-favoured petrol ...

1933-10-21T23:59:59.000Z

133

Eco-burden in pavement maintenance: Effects from excess traffic growth and overload  

Science Journals Connector (OSTI)

Abstract Road pavement is designed to support certain usage conditions. However, many abnormal usages above regulated level often happen. Excess traffic growth is considered as a factor influencing road life-performance. Overload phenomenon has also long been recognized as an unexpected force causing extreme decrease of road performance. This study investigates the eco-burden effect of road construction in its maintenance phase along with the influence of above factors in shortening road life-cycle. Because of that, life-cycle assessment (LCA) is used to calculate the eco-burden impact. Furthermore, they are two different options taken for pavement materials: hot-mix and recycled asphalt. They are compared in order to provide comprehensive investigation results for decision makers. Eco-Indicator 99 is used as the impact database in order to standardize calculation processes. Seven sections of Pantura (Pantai Utara North Beach) road, Indonesia, are picked up to be the case studies as a basis in understanding correlation between all factors to eco-burden impact in road maintenance. This study concludes that each of excess traffic growth and overload is positively correlated with the increase of eco-burden impact. The more extreme shortening of road life-cycle, the more eco-burden will be produced, and it will increase faster in polynomial functions. By looking at previous studies which tend to focus on eco-burden in ideal condition of road life-cycle, this study throws new light on the effects of abnormal phenomena on road usage which shorten pavement life-performance as well as increase eco-burden impacts.

Corinthias P.M. Sianipar; Kiyoshi Dowaki

2014-01-01T23:59:59.000Z

134

Tips and Tools for Promoting Your Energy Efficiency Project ...  

Broader source: Energy.gov (indexed) [DOE]

not only on energy costs, but down the road in terms of savings on maintenance or avoided costs from other sources. Really thinking about what the money savings is will help you...

135

Project 301  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2006 2006 Combustion Technologies CONTACTS Robert R. Romanosky Advanced Research Technology Manager National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507 304-285-4721 robert.romanosky@netl.doe.gov Arun C. Bose Project Manager National Energy Technology Laboratory 626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236 412-386-4467 arun.bose@netl.doe.gov ADVANCED, LOW/ZERO EMISSION BOILER DESIGN AND OPERATION Background Over the past years, environmental concerns regarding pollutants have grown dramatically. Current annual greenhouse gas (GHG) emissions are 12% higher than they were in 1992. In addition, carbon dioxide (CO 2 ) emissions are projected to increase by an additional 34% over the next 20 years. About one third of carbon emissions in the

136

Using Daylight to Light the Access Zone of Road Tunnels  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Using Daylight to Light the Access Zone of Road Tunnels Using Daylight to Light the Access Zone of Road Tunnels Speaker(s): Eliyahu Ne'eman Date: March 4, 2003 - 12:00pm Location: Bldg. 90 Lighting guides for roadway tunnels specify relatively high luminances for the "access zone" into the tunnel. They are needed to allow the eyes of the driver sufficient time to adapt during the short period of the transition from the outdoor natural daylight levels to the fairly low luminances along the main length of the tunnel. Usually, the necessary high luminances are provided by rows of costly luminaries which consume a lot of electricity during peak use periods and need a good deal of maintenance. To save some electric power, controls are used to dim the lighting on cloudy hours. Daylight has been used for the access zone in several tunnels around the

137

The Australasian College of Road Safety Road Safety 2020: Smart Solutions, Sustainability, Vision, Conference Proceedings, 5-6 November 2009  

E-Print Network [OSTI]

The Australasian College of Road Safety Road Safety 2020: Smart Solutions, Sustainability, Vision Solutions, Sustainability, Vision The Australasian College of Road Safety Conference, Perth, Western Australia : Australia (2009)" #12;The Australasian College of Road Safety Road Safety 2020: Smart Solutions

Paris-Sud XI, Université de

138

VNG's Hampton Roads Pipeline Crossing  

Broader source: Energy.gov (indexed) [DOE]

VNG's Hampton Roads Pipeline Crossing VNG's Hampton Roads Pipeline Crossing FUPWG Conference Fall 2008 Williamsburg, Virginia Connection to DTI at Quantico Columbia Limitations South Hampton Roads served by a single pipeline Southside dependent on back up systems LNG Propane/air Two supply sources to VNG What if we connected pipelines? It would take Two Water Crossings Two Compressor Stations Construction in densely populated cities It could Deliver over 200,000 Dth of incremental supply Serve VNG, Columbia and Dominion customers ...we would get... Hampton Roads Crossing - HRX Hampton / Newport News Craney Island Norfolk 21 miles of 24" pipe 7 miles in Hampton/Newport News 4 miles in Norfolk 10 miles of water and island crossing 4 mile harbor crossing 4.5 miles on Craney

139

CHESTNUT RIDGE RD VALLEY ROAD  

E-Print Network [OSTI]

SIGN TO: OAK RIDGE, Y-12,AND KNOXVILLE CHESTNUT RIDGE ROAD FIRSTSTREET 95 95 HFIR and SNS Sites #12;SNS PARKING CNMS PARKING COVERED BRIDGE 8310 87008910 8913 8911 8100 8330 CHESTNUT RIDGE RD TO

140

Tunnels for roads and motorways  

Science Journals Connector (OSTI)

...compromise. Such a solution also offers no protection to pedestrians and tunnel service personnel; this is a consideration...unit length of the tunnel but also its extent from portal to portal. Whereas motorways and trunk roads usually tolerate...

Alan Marshall Muir Wood

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

RESTRICTED ACCESS to Groat Road  

E-Print Network [OSTI]

AveUniversity Ave University Ave South Ave 80 Ave 82 Ave Braithwaite Park North Saskatchewan River Mc Ave Edinboro Road Saskatchewan Drive Saskatchewan Drive Saskatchewan Drive 88 Corbett Field West

MacMillan, Andrew

142

Farm Out Maintenance Headaches  

Science Journals Connector (OSTI)

TIDEWATER OIL chalked up a number of firsts with its new Delaware refinery. The size and modern design of the plant drew a lot of attention and over-shadowed what may eventually be the most significant "first"contract instrument maintenance.At the giant ...

1957-08-26T23:59:59.000Z

143

Power Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Projects Power Projects Contact SN Customers Environmental Review-NEPA Operations & Maintenance Planning & Projects Power Marketing Rates You are here: SN Home page > About SNR Power Projects Central Valley: In California's Central Valley, 18 dams create reservoirs that can store 13 million acre-feet of water. The project's 615 miles of canals irrigate an area 400 miles long and 45 miles wide--almost one third of California. Powerplants at the dams have an installed capacity of 2,099 megawatts and provide enough energy for 650,000 people. Transmission lines total about 865 circuit-miles. Washoe: This project in west-central Nevada and east-central California was designed to improve the regulation of runoff from the Truckee and Carson river systems and to provide supplemental irrigation water and drainage, as well as water for municipal, industrial and fishery use. The project's Stampede Powerplant has a maximum capacity of 4 MW.

144

Operations and Maintenance Team | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Team Team Operations and Maintenance Team October 16, 2013 - 5:00pm Addthis Assembling the right set of skills and resources to operate and maintain a renewable energy system is critical. Renewable energy technologies only perform as specified when managed by a well-trained, highly motivated operations and maintenance (O&M) team. For a renewable energy project financed through an energy savings performance contract (ESPC) or a power purchase agreement (PPA), primary O&M services are typically delivered as part of the agreement, but in-house staff will need some familiarity with the system. For agency-funded projects, O&M services may be provided by in-house facilities staff, a contracted service provider, or a combination of the two. Experienced O&M staff can provide valuable input and should be included in

145

DOE - Office of Legacy Management -- Dayton Project Units 3 and 4 - OH 07  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Dayton Project Units 3 and 4 - OH Dayton Project Units 3 and 4 - OH 07 FUSRAP Considered Sites Site: Dayton Project Units 3 & 4 (OH.07 ) U.S. Army Corps of Engineers (FUSRAP) - No Further Action Designated Name: Not Designated Alternate Name: Monsanto Units III and IV Unit III - Board of Education Maintenance Facility Unit IV - Runnymede Playhouse OH.07-1 OH.07-2 OH.07-3 Location: Unit III - 1601 W. First Street Unit IV - Runnymede Road and Dixon Avenue , Dayton , Ohio OH.07-4 OH.07-5 Evaluation Year: 1987 Site Operations: October 1943 to mid-1950 - AEC conducted research and manufactured Polonium by lead dioxide and bismuth processes OH.07-4 Site Disposition: Eliminated - radiation levels below criteria. OH.07-9 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Polonium OH.07-1

146

Reactive Maintenance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Reactive Maintenance Reactive Maintenance Reactive Maintenance October 7, 2013 - 9:40am Addthis Reactive maintenance follows a run-it-until-it-breaks strategy where no actions or efforts are taken to maintain equipment as intended by the manufacturer. Studies indicate this is still the predominant mode of maintenance for Federal facilities. Advantages Reactive maintenance advantages are a double-edged sword. Federal agencies following a purely reactive maintenance strategy can expect little expenditures for manpower or system upkeep until something breaks. However, systems do break. With new equipment, Federal agencies can expect minimal incidents of failure. However, older equipment often experiences higher failure incidents and costlier repairs. Other advantages of reactive maintenance are:

147

Preventive Maintenance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Preventive Maintenance Preventive Maintenance Preventive Maintenance October 7, 2013 - 9:44am Addthis Preventive maintenance aims to sustain or extend system lifespan through a set of actions that detect, preclude, or mitigate system degradation. These actions are based on either calendar time or machine run time. Advantages Federal agencies can greatly extend equipment reliability and lifespan by expending the necessary resources for regular maintenance. In most cases, the system designer or manufacturer outlines regular maintenance under a preventive strategy. In addition to increased reliability and lifespan, budget is saved over the life of the system. Preventive maintenance programs can save as much as 12% to 18% in equipment repair and replacement. Other advantages of preventitive maintenance are:

148

The Maintenance of Solar Energy  

Science Journals Connector (OSTI)

... this short essay is not satisfied with the current ideas as to the maintenance of solar ...solarenergy ...

1899-10-26T23:59:59.000Z

149

HVAC Maintenance and Technologies  

Broader source: Energy.gov (indexed) [DOE]

HVAC - HVAC - Maintenance and Technologies Federal Utility Partnership Working Group Meeting Providence, Rhode Island April 15, 2010 BY Ramin Faramarzi, P.E. Technology Test Centers (TTC) Design and Engineering Services Southern California Edison (SCE) www.sce.com/rttc 2 Outline * Introduction to SCE's TTC * Overview of energy challenges in California (CA) * Role of HVAC in CA's energy and demand equations * Factors affecting HVAC performance * Focus on SCE's research on maintenance faults * Next generation of HVAC equipment * HVAC technologies on SCE's TTC radar * Black boxes - do they all work? 3 SCE's Technology Test Centers * SCE applied research facilities located in Irwindale, CA comprised of 3 test beds: * Refrigeration * HVAC * Lighting * Coming Soon! - A new ZNE lab 4 Refrigeration Testing

150

care and maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Care and Maintenance of the Prairie Parcel Care and Maintenance of the Prairie Parcel Now that your prairie parcel is up and growing, there are just a few concerns that you should consider about its care. Weeding The question of weeding is really just a matter of aesthetics. You do not have to weed your parcel. If your parcel is a large one, weeding may not even be practical. Although the "weed" species will dominate your parcel for the first few years, they will give way to the native plant species. You can liken the native plants to long distance runners; they appear to start off slowly, but end up winning the ecological race. After all, they are the plants that are genetically-suited and adapted to growing in this environment. The native prairie plants will be developing extensive root structure the

151

Project 398  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6 6 Gasification Technologies CONTACTS Gary J. Stiegel Gasification Technology Manager National Energy Technology Laboratory 626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236 412-386-4499 gary.stiegel@netl.doe.gov Ronald Breault Project Manager National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507 304-285-4486 ronald.breault@netl.doe.gov Michael Swanson Principal Investigator University of North Dakota Energy and Environmental Research Center 15 North 23rd Street P.O. Box 9018 Grand Forks, ND 58202 701-777-5239 mswanson@eerc.und.nodak.edu ADVANCED HIGH TEMPERATURE, HIGH-PRESSURE TRANSPORT REACTOR Description Today, coal supplies over 55 percent of the electricity consumed in the United States and will continue to do so well into the next century. One of the technologies being

152

Project 339  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Combustion Combustion Technologies CONTACTS Robert R. Romanosky Advanced Research Technology Manager National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507 304-285-4721 robert.romanosky@netl.doe.gov Jenny Tennant Project Manager National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507 304-285-4830 jenny.tennant@netl.doe.gov Dr. Tomasz Wiltowski Southern Illinios University Dept. of Mechanical Engineering & Energy Processes Carbondale, IL 62901-4709 618-536-5521 tomek@siu.edu QUALIFICATIONS OF CANDLE FILTERS FOR COMBINED CYCLE COMBUSTION APPLICATIONS Background In order to make oxygen-fired combined cycle combustion feasible, it is necessary to have a reliable high temperature particulate cleanup system. It is well established

153

Project 397  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6 6 Gasification Technologies CONTACTS Gary J. Stiegel Gasification Technology Manager National Energy Technology Laboratory 626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236 412-386-4499 gary.stiegel@netl.doe.gov John Stipanovich Project Manager National Energy Technology Laboratory 626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236 412-386-6027 john.stipanovich@netl.doe.gov Derek Aldred Principal Investigator Stamet, Inc. 8210 Lankershim Blvd. #9 North Hollywood, CA 91605 818-768-1025 dlaldred@stametinc.com CONTINUOUS PRESSURE INJECTION OF SOLID FUELS INTO ADVANCED COMBUSTION SYSTEM PRESSURES Description Operators and designers of high-pressure combustion systems universally agree that one of the major problems inhibiting the success of this technology relates to solid

154

ADEC II Universal SCR Retrofit System for On-road and Off-road...  

Broader source: Energy.gov (indexed) [DOE]

ADEC II Universal SCR Retrofit System for On-road and Off-road Diesel Engines Richard Carlson Extengine Transport Systems, LLC Fullerton, California 2006 DEER Conference Poster...

155

Optimal threshold-based network-level transportation infrastructure life-cycle management with heterogeneous maintenance actions  

Science Journals Connector (OSTI)

Transportation infrastructure life-cycle management deals with maintenance decision making of transportation facilities such as pavement, bridges, and railways under budget constraints. In practice, transportation agencies adopt threshold-based rules for maintenance planning because they are intuitive and easy to implement. However, the thresholds are often determined based on engineering judgment without any systematic approach. Therefore, maintenance budgets cannot be used effectively and facility conditions are not optimized. This research uses hybrid dynamic models to represent threshold-based maintenance for transportation infrastructure in a realistic manner. Hybrid dynamic models combine continuous states such as pavement roughness and age with discrete states such as maintenance history. These models are also capable of considering multiple maintenance actions with heterogeneous effects. Based on facility conditions and maintenance thresholds, corresponding maintenance actions are selected automatically and the facility switches between deterioration modes to reflect the effects of the chosen action. Furthermore, to consider users reactions to maintenance actions and accurately predict deterioration for a network of facilities, threshold-based maintenance is formulated as an upper-level problem, and user response is incorporated as a lower-level problem. This leads to a bi-level programming problem where maintenance thresholds are decision variables, which is solved with a modified tabu search algorithm. The proposed methodology is validated with the road network of an urban area and the generated maintenance thresholds are reasonable and robust, which shows that the methodology has great potential to support transportation infrastructure life-cycle management in practice.

James C. Chu; Yin-Jay Chen

2012-01-01T23:59:59.000Z

156

USVI Energy Road Map: Charting the Course to a Clean Energy Future  

Broader source: Energy.gov (indexed) [DOE]

USVI Energy Road Map: Charting the Course to a Clean Energy Future USVI Energy Road Map: Charting the Course to a Clean Energy Future (Brochure), EDIN (Energy Development in Island Nations), U.S. Virgin Islands USVI Energy Road Map: Charting the Course to a Clean Energy Future (Brochure), EDIN (Energy Development in Island Nations), U.S. Virgin Islands This brochure provides an overview of the integrated clean energy deployment process and progress of the Energy Development in Island Nations U.S. Virgin Islands pilot project road map, including over-arching goals, organization, strategy, technology-specific goals and accomplishments, challenges, solutions, and upcoming milestones. edinusvi_roadmap.pdf More Documents & Publications U.S. Virgin Islands Energy Road Map: Analysis Integrating Renewable Energy into the Transmission and Distribution System

157

USVI Energy Road Map: Charting the Course to a Clean Energy Future  

Broader source: Energy.gov (indexed) [DOE]

USVI Energy Road Map: Charting the Course to a Clean Energy Future USVI Energy Road Map: Charting the Course to a Clean Energy Future (Brochure), EDIN (Energy Development in Island Nations), U.S. Virgin Islands USVI Energy Road Map: Charting the Course to a Clean Energy Future (Brochure), EDIN (Energy Development in Island Nations), U.S. Virgin Islands This brochure provides an overview of the integrated clean energy deployment process and progress of the Energy Development in Island Nations U.S. Virgin Islands pilot project road map, including over-arching goals, organization, strategy, technology-specific goals and accomplishments, challenges, solutions, and upcoming milestones. edinusvi_roadmap.pdf More Documents & Publications U.S. Virgin Islands Energy Road Map: Analysis Integrating Renewable Energy into the Transmission and Distribution System

158

Task 3 - RMC method validation project report  

SciTech Connect (OSTI)

The EPRI Substation Reliability Centered Maintenance Project Task 3 uses utility data to validate the RCM process for maintenance in substations. At BPA, this project was used to validate the RCM method for a preventive maintenance program for substations. This project was performed by an RCM technical team and all maintenance personnel at the Chemawa Maintenance District Headquarters. The system chosen for, this project involved four transmission lines that feeds 230 kV Santiam Substation. This report explains the process for the system approach-used for the Santiam project and a summary of the results. The current preventive maintenance program is primarily based on time. The RCM approach for a preventive maintenance program realized significant savings.

Sarkinen, R.A. [Bonneville Power Administration, Vancouver, WA (United States)

1996-08-01T23:59:59.000Z

159

Project Execution Plan Review Module (RM)  

Broader source: Energy.gov [DOE]

The Project Execution Plan (PEP) Review Module (RM) is a tool that assists DOE federal project review teams in evaluating the adequacy of the PEP development and maintenance for projects of any...

160

Federal Energy Management Program: Maintenance Types  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Maintenance Types Maintenance Types to someone by E-mail Share Federal Energy Management Program: Maintenance Types on Facebook Tweet about Federal Energy Management Program: Maintenance Types on Twitter Bookmark Federal Energy Management Program: Maintenance Types on Google Bookmark Federal Energy Management Program: Maintenance Types on Delicious Rank Federal Energy Management Program: Maintenance Types on Digg Find More places to share Federal Energy Management Program: Maintenance Types on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Reactive Preventive Predictive Reliability-Centered Major Equipment Types Resources Contacts

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

The Road to REDD  

Science Journals Connector (OSTI)

Carbon markets, already in place for industrial emissions, work like this: industries or other polluters in developed countries pay companies or communities in developing countries to reduce emissions. ... Moskovits and her colleagues in Peru received funds from the utility company Exelon to figure out how a REDD project could be implemented in the region. ... But for most people who think and breathe REDD, the real deadline is next years climate change conference in Copenhagen (often called COP-15), where leaders are hoping to formalize an agreement on how to move forward with this mechanism. ...

Rhitu Chatterjee

2009-01-29T23:59:59.000Z

162

Lawn Maintenance Safety  

E-Print Network [OSTI]

with lawn and garden tools, more than half involving riding lawn mowers and garden tractors. You can avoid accidents like these by making safety a regular part of lawn maintenance, particularly when using lawn mowers and other power tools. Lawn Mowers... mowers save homeowners valuable time and energy. These small tractors are much more powerful than walk-behind mowers and move two to three times as fast. To avoid accidents on riding mowers or larger tractors, it is important to use safe driving...

Smith, David

2005-07-12T23:59:59.000Z

163

Project title:  

Broader source: Energy.gov (indexed) [DOE]

Project title: Roseville Elverta (RSC-ELV) OPGW Replacement Project Project title: Roseville Elverta (RSC-ELV) OPGW Replacement Project Requested By: David Young Mail Code : N1410 Phone: 916-353-4542 Date Submitted: 5/4/2011 Date Required: 5/7/2011 Description of the Project: Purpose and Need The Western Area Power Administration (Western), Sierra Nevada Region (SNR), is responsible for the operation and maintenance (O&M) of federally owned and operated transmission lines, Switchyards, and facilities throughout California. Western and Reclamation must comply with the National Electric Safety Code, Western States Coordinating Council (WECC), and internal directives for protecting human safety, the physical environment, and maintaining the reliable operation of the transmission system. There is an existing OPGW communications fiber on the transmission towers between Roseville and Elverta

164

Sally Johnson 123 Bakers Road  

E-Print Network [OSTI]

Sally Johnson 123 Bakers Road Nashville, TN 37212 Sally.Johnson@vanderbilt.edu May 2, 2011 Leslie qualifications, you may reach me at (615) 555-5555 or Sally.johnson@vanderbilt.edu at your earliest convenience) Sally Johnson Enclosure Address blocks are used when the document is printed or attached to an email

Bordenstein, Seth

165

Monitoring 20 Silent Roads Over 10 Years In The Municipality Of Groningen  

Science Journals Connector (OSTI)

The municipality of Groningen in the northern part of the Netherlands has a wide experience with the application of silent roads. This experience covers a period of about 20 tracks with 2?layered porous asphalt and various types of thin layers. These tracks have been and are monitored regularly. The obtained data from 10 years monitoring offer a vast amount of valuable information on noise reduction durability maintenance costs contracts and policy. The municipality of Groningen in the northern part of the Netherlands has a wide experience with the application of silent roads. This experience covers a period of about 20 tracks with 2?layered porous asphalt and various types of thin layers. These tracks have been and are monitored regularly. The obtained data from 10 years monitoring offer a vast amount of valuable information on noise reduction durability maintenance costs contracts and policy.

Wim Van Keulen

2008-01-01T23:59:59.000Z

166

Machine Maintenance Integrated Performance Support System  

SciTech Connect (OSTI)

The objectives of this partnership project were to develop a preventive maintenance checklist program, a troubleshooting system for the Vertical Turning Center (VTC)-5, an on-line manual, and to integrate these components with a custom browser that would run on the VTC-5 machine's controller and would support future internet/intranet delivery. Kingsbury provided subject matter experts from engineering, manufacturing, and technical support. They also provided photographs, schematics, and CAD drawings, which AlliedSignal Federal Manufacturing and Technologies (ASFM and T) digitized for use in the final program. Information from The Kingsbury troubleshooting experts were interviewed regarding symptoms and root causes of system malfunctions This knowledge was captured and from it, fault trees were developed. These trees were then incorporated into the EPSS as a troubleshooting tool. The troubleshooting portion of the system presents simple questions to the machine operator in order to determine the likely cause or causes of malfunctions and then recommends systematic corrective actions. The on-line reference manual, covering operations and maintenance, provides text and illustrations to the machine operator in a traditional structure, but additionally offers the capability to search voluminous amounts of technical data and retrieve specific information on request. The maintenance portion of the EPSS includes checklists that are displayed daily, weekly, monthly, and annually, as appropriate, on the VTC-5 controller screen. The controller software is unavailable for machining parts until the machine tool operator goes through and checks off all of the checklist items. This project provided the team with a detailed understanding of the knowledge and information required to produce and support advanced machine tools. In addition, it resulted in the design and construction of a prototype VTC-5 EPSS containing all the logic and interfaces necessary to integrate operations and maintenance information from other Kingsbury machine tools.

Bohley, M.C.; Schwartz, M.E.

1998-03-11T23:59:59.000Z

167

Reliability-Centered Maintenance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Reliability-Centered Maintenance Reliability-Centered Maintenance Reliability-Centered Maintenance October 7, 2013 - 9:48am Addthis Reliability-centered maintenance leverages the same practices and technologies of predictive maintenance. The difference is that reliability-centered maintenance recognizes that: Equipment design and operations differ Different equipment has different probabilities of failure All equipment is not of equal importance to facility operations Facilities have limited financial and personnel resources. While reliability-centered maintenance relies on predictive maintenance practices and technologies, it also recognizes that maintenance on inexpensive and/or unimportant equipment may be better served by a reactive or predictive maintenance approach. Each of the aforementioned factors are

168

Federal Energy Management Program: Reactive Maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Reactive Reactive Maintenance to someone by E-mail Share Federal Energy Management Program: Reactive Maintenance on Facebook Tweet about Federal Energy Management Program: Reactive Maintenance on Twitter Bookmark Federal Energy Management Program: Reactive Maintenance on Google Bookmark Federal Energy Management Program: Reactive Maintenance on Delicious Rank Federal Energy Management Program: Reactive Maintenance on Digg Find More places to share Federal Energy Management Program: Reactive Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Reactive Preventive Predictive Reliability-Centered Major Equipment Types

169

Federal Energy Management Program: Operations and Maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Operations and Operations and Maintenance to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance on Google Bookmark Federal Energy Management Program: Operations and Maintenance on Delicious Rank Federal Energy Management Program: Operations and Maintenance on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Major Equipment Types Resources

170

Federal Energy Management Program: Preventive Maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Preventive Preventive Maintenance to someone by E-mail Share Federal Energy Management Program: Preventive Maintenance on Facebook Tweet about Federal Energy Management Program: Preventive Maintenance on Twitter Bookmark Federal Energy Management Program: Preventive Maintenance on Google Bookmark Federal Energy Management Program: Preventive Maintenance on Delicious Rank Federal Energy Management Program: Preventive Maintenance on Digg Find More places to share Federal Energy Management Program: Preventive Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Reactive Preventive Predictive Reliability-Centered Major Equipment Types

171

Turfgrass: Maintenance Costs in Texas.  

E-Print Network [OSTI]

LAW FOR VARIOUS M-AINTENANCE ITEMS BASED ON O\\!'\\'S. ERSHIP AND TYPE OF GRASS WITHIN EACH REGION Maintenance items TY PC Percent Lot size, Region of oz;r- of lawns square Com~osty Fertilizer Chemicals Water Average grass in region feet cost cost... LAW FOR VARIOUS M-AINTENANCE ITEMS BASED ON O\\!'\\'S. ERSHIP AND TYPE OF GRASS WITHIN EACH REGION Maintenance items TY PC Percent Lot size, Region of oz;r- of lawns square Com~osty Fertilizer Chemicals Water Average grass in region feet cost cost...

Holt, Ethan C.; Allen, W. Wayne; Ferguson, Marvin H.

1964-01-01T23:59:59.000Z

172

Sustainability of green space maintenance  

E-Print Network [OSTI]

In Japan, recent changes in socio-economic and political structures -- decreasing tax revenue, declining communication among community members, and privatization of public services-- have influenced existing maintenance ...

Nomura, Wataru

2011-01-01T23:59:59.000Z

173

Maintenance Types | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

prevent failure, or ensure life of the system even if actions are suggested by the manufacturer. Preventive Maintenance: Refers to a series of actions performed on calendar time...

174

U.S. DEPARTMENT OFllNERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

OFllNERGY OFllNERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION RECIPIENT:Washington Department of Commerce Page 1 of2 STATE: WA PROJECT TITLE: Kittitas County, Washington Morris Sorensen Bldg. & Upper County Shop· EECBG State of Washington Funding Opportunity Announcement Number Procuremenllnslrument Number DE-EE0000849 NEPA Control Number em Number EEO Based on my review orlhe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A),1 have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 81.3 Routine maintenance activities and custodial services for buildings, structures, rights-of-way, infrastructures (e.g ., pathways. roads, and railroads ). vehicles and equipment. and localized vegetation and pest control. during which

175

NETL: Oil & Natural Gas Projects: Alaska North Slope Oil and Gas  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Alaska North Slope Oil and Gas Transportation Support System Last Reviewed 12/23/2013 Alaska North Slope Oil and Gas Transportation Support System Last Reviewed 12/23/2013 DE-FE0001240 Goal The primary objectives of this project are to develop analysis and management tools related to Arctic transportation networks (e.g., ice and snow road networks) that are critical to North Slope, Alaska oil and gas development. Performers Geo-Watersheds Scientific, Fairbanks, AK 99708 University of Alaska Fairbanks, Fairbanks, AK 99775 Idaho National Laboratory, Idaho Falls, ID 83415 Background Oil and gas development on the North Slope is critical for maintaining U.S. energy supplies and is facing a period of new growth to meet the increasing energy needs of the nation. A majority of all exploration and development activities, pipeline maintenance, and other field support projects take

176

Mechanical Operations and Maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Holiday Work Status Holiday Work Status Mechanical Operations & Maintenance Group APS Storage Ring Magnets The Advanced Photon Source (APS) at the Argonne National Laboratory is a national synchrotron-radiation research facility funded by the U.S. Department of Energy. Using high-brilliance x-ray beams from the APS, an international community of scientists conducts forefront basic and applied research in the fields of material science, biological science, physics, chemistry, environmental, geophysical and planetary science. The 1.1-km circumference APS facility consists of several major subsystems including magnets, vacuum chambers, radio-frequency cavities, diagnostics instrumentation, x-ray absorbers and apertures, and cooling water subsystems. Each of these subsystems contains hundreds of mechanical

177

Microsoft Word - CX-RiceFlatsSiteMaintenanceFY12_WEB.docx  

Broader source: Energy.gov (indexed) [DOE]

12, 2012 12, 2012 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Steve Lowder Project Manager - TESM-AMPN-2 Proposed Action: Rice Flats Electrode Site Maintenance and Inspection Project Budget Information: Work Order #00219387 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities Location: The proposed project area is approximately seven miles southeast of The Dalles,

178

Training on PV Systems: Design, Construction, Operation and Maintenance |  

Open Energy Info (EERE)

Training on PV Systems: Design, Construction, Operation and Maintenance Training on PV Systems: Design, Construction, Operation and Maintenance Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Training on PV Systems: Design, Construction, Operation and Maintenance Agency/Company /Organization: Leonardo Energy Sector: Energy Focus Area: Renewable Energy, Solar Website: www.leonardo-energy.org/node/5948 Training on PV Systems: Design, Construction, Operation and Maintenance Screenshot References: PV Training [1] Overview "A free series of six webinars will be delivered to provide the required knowledge to design a high performance photovoltaic (PV) installation, entering into economic evaluation and project cash-flow. Additionally, very practical aspects such as the construction, start-up, quality management and testing will be reviewed. Plant operation is described in detail, with

179

Landscape Maintenance Considerations for Homeowner  

E-Print Network [OSTI]

Landscape Maintenance Considerations for Homeowner Associations: Save Money, Be Safe, Look Good is getting their money's worth from the landscape maintenance company. Photo credit: Asset Landscaping! Kelly Murray Young Haley Paul #12;1. Consider landscape plants a long- term investment · Trees

Sanderson, Mike

180

HFIR Plant Maintenance - August  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

July 2012 July 2012 2 Managed by UT-Battelle for the U.S. Department of Energy ORNL Isotope Infrastructure DataTransferKit Public release of CASL infra- structure software TriBITS Three key components of the VERA (Virtual Environment for Reactor Applications) infrastructure have been released and made publicly-available. Lightweight Integrating Multiphysics Environment (LIME) * The Tribal Build, Integrate, and Test System is built on the open-source Kitware CMake, CTest, CDash tools and provides a solution for very large scale projects, especially meta- projects resulting from the integration of many different (but interrelated) projects. * Available at: http://code.google.com/p/tribits/ * DataTransferKit (DTK) is being developed to implement the rendezvous algorithm and the

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

OpenEI Community - Maintenance  

Open Energy Info (EERE)

maintenance maintenance March 8-9, 2013 http://en.openei.org/community/blog/openei-maintenance-march-8-9-2013  We would like to inform the OpenEI community that OpenEI will be undergoing a significant software upgrade during a maintenance window this weekend.  We will be upgrading the wiki and semantic mediawiki portions of OpenEI, which means /datasets, /apps, /lod, /sparql and /community will continue to function normally.  Additionally, web services that rely on Ask queries (utility rate database API) may have some downtime as we transition.maintenance-march-8-9-2013" target="_blank">read more

182

Federal Energy Management Program: Predictive Maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

to someone by E-mail to someone by E-mail Share Federal Energy Management Program: Predictive Maintenance on Facebook Tweet about Federal Energy Management Program: Predictive Maintenance on Twitter Bookmark Federal Energy Management Program: Predictive Maintenance on Google Bookmark Federal Energy Management Program: Predictive Maintenance on Delicious Rank Federal Energy Management Program: Predictive Maintenance on Digg Find More places to share Federal Energy Management Program: Predictive Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Reactive Preventive Predictive Reliability-Centered Major Equipment Types Resources

183

MaintenanceRecords  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7BA003539 7BA003539 Maintenance Sheet for 2011 Hyundai Sonata Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 7/19/2011 5,720 Changed oil and filter $14.67 10/12/2011 11,152 Changed oil and filter and rotated tires $60.49 10/21/2011 12,342 Upgraded ECU (TG5), replaced NVLD pressure sensor (TG6), and replaced cooling fan resistor (TG8) warranty 11/21/2011 16,442 Changed oil and filter $43.22 12/20/2011 22,497 Changed oil and filter and rotated tires $56.85 1/24/2012 28,205 Changed oil and filter $41.85 2/6/2012 30,100 30K service $109.16 2/9/2012 30,460 Recall: replaced two high voltage connectors at the HPCU n/c 2/27/2012 33,208 Changed oil and filter and rotated tires $56.85 3/24/2012 40,809 Changed oil and filter $41.85 4/20/2012 47,580 Changed oil and filter and rotated tires

184

Operations and Maintenance Program Implementation | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Program Implementation Program Implementation Operations and Maintenance Program Implementation October 4, 2013 - 5:16pm Addthis Implementing an effective operations and maintenance (O&M) program requires patience and persistence. This is especially true since no universal plan fits all Federal agencies. While no universal plan exists, Federal Energy Management Program (FEMP) recommends the following common steps for implementing O&M programs: Start small: Choose a project that is manageable and can be completed in a short period of time (e.g., six months to one year) Select troubled equipment: Choose a project with visibility because of problematic equipment history Minimize risk: Choose a project that provides immediate and positive results; this project must be successful, so risk of failure should be

185

Alaskan Ice Road Water Supplies Augmented by Snow Barriers  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6, 2013 6, 2013 Alaskan Ice Road Water Supplies Augmented by Snow Barriers Washington, D.C. - In a project supported and managed by the Office of Fossil Energy's National Energy Technology Laboratory (NETL), researchers at the University of Alaska Fairbanks have demonstrated that the use of artificial barriers-snow fences-can significantly increase the amount of fresh water supplies in Arctic lakes at a fraction of the cost of bringing in water from nearby lakes. The results promise to enhance environmentally sound development of Alaska's natural resources, lowering the costs of building ice roads used for exploring for oil and natural gas in Alaska. They could also be used to help augment fresh water supplies at remote villages. Researcher Joel Bailey measures the density of the snow in this snow pit to determine the amount of snow in the drift and the water equivalent of the snow drift.

186

Open source software development and maintenance: an exploratory analysis  

E-Print Network [OSTI]

-scale development projects (Aoki et al. 2001; German 2004; Kerstetter et al. 2003; Markus et al. 2000; Scacchi 2004b; Wheeler 2003). Some have looked into issues like participation in OSS projects (Bergquist and Ljungberg 2001; Crowston and Scozzi 2002; Dempsey.... According to estimates, software maintenance consumes more than 80% of the lifecycle costs of software systems (Erlikh 2000; Moad 1990). From the point of view of organizational resources, IS departments spend 50-80% of their budgets on software...

Raja, Uzma

2009-06-02T23:59:59.000Z

187

ROAD-MAN-LANDSCAPE -IN THEORY ASB155 Road-man-landscape -in theory  

E-Print Network [OSTI]

and environmental requirements. Innehåll: Course content: New roads in the landscape. Conversion concepts in traffic planning, road construction, landscape architecture, urban architecture, planning for masters (graduate) students of engineering, architecture and landscape architecture, and future planners

188

ROAD-MAN-LANDSCAPE -DESIGNPROJECT ASB150 Road-man-landscape -designproject  

E-Print Network [OSTI]

, landscape and environmental requirements. Innehåll: Course content: New roads in the landscape. Conversion concepts in traffic planning, road construction, landscape architecture, urban architecture, planning (graduate) students of engineering, architecture and landscape architecture, and future planners

189

South Fence Road -- Phase 1 field operations summary  

SciTech Connect (OSTI)

The South Fence Road (SFR) project is part of the Sandia National Laboratories, New Mexico (SNL/NM) Site-Wide Hydrogeologic Characterization (SWHC) task. The SWHC task has as its objective the reduction of uncertainty about the rate and direction of groundwater flow in the SNL/NM/Kirtland Air Force Base (KAFB) area. The SFR project area is located along the southern boundary of SNL/KAFB. This project area was selected to provide site-specific information related to geology and groundwater hydrology within the Hubbell Spring/Tijeras/Sandia fault complex. Specific objectives included determining the depth to the Santa Fe Group/bedrock contact, the depth to the water table, and the hydrogeologic complexities related to faulting. This report is a basic data report from the first phase of field operations associated with the drilling, logging, completion, and development of South Fence Road Wells SFR-1D and SFR-1S, SFR-2, SFR-3D and SFR-3S, and SFR-4. These test/monitoring wells were installed as part of Sandia National Laboratories, New Mexico, Environmental Restoration Project.

McCord, J.P. [INTERA, Inc., Albuquerque, NM (United States); Neel, D. [GRAM, Inc., Albuquerque, NM (United States)

1996-03-01T23:59:59.000Z

190

Federal Energy Management Program: Computerized Maintenance Management  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Computerized Computerized Maintenance Management Systems to someone by E-mail Share Federal Energy Management Program: Computerized Maintenance Management Systems on Facebook Tweet about Federal Energy Management Program: Computerized Maintenance Management Systems on Twitter Bookmark Federal Energy Management Program: Computerized Maintenance Management Systems on Google Bookmark Federal Energy Management Program: Computerized Maintenance Management Systems on Delicious Rank Federal Energy Management Program: Computerized Maintenance Management Systems on Digg Find More places to share Federal Energy Management Program: Computerized Maintenance Management Systems on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management

191

Operations and Maintenance | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Operations and Maintenance Operations and Maintenance Federal facilities rely on pumps, motors, fans, and other mechanical systems for everyday operations. These systems must be...

192

Operations and Maintenance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Operations and Maintenance Operations and Maintenance Federal facilities rely on pumps, motors, fans, and other mechanical systems for everyday operations. These systems...

193

DSW Power Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Projects Contact DSW Customers Customer Meetings Environmental Review-NEPA Operations & Maintenance Planning & Projects Power Marketing Power Projects Contact DSW Customers Customer Meetings Environmental Review-NEPA Operations & Maintenance Planning & Projects Power Marketing Rates DSW Power Projects Boulder Canyon: Straddling the Colorado River near the Arizona-Nevada border, Hoover Dam in Boulder Canyon creates Lake Mead. River waters turning turbines at Hoover Powerplant produce about 2,074 MW--enough electricity for nearly 8 million people. Western markets this power to public utilities in Arizona, California and Nevada over 53.30 circuit-miles of transmission line. Central Arizona: Authorized in 1968, the Central Arizona Project in Arizona and western New Mexico was built to improve water resources in the Colorado River Basin. Segments of the authorization allowed for Federal participation in the Navajo Generating Station. The Federal share of the powerplant's combined capacity is 547 MW.

194

Operations and Maintenance Management Support  

Broader source: Energy.gov [DOE]

Federal operations and maintenance (O&M) programs must gain full support from management to succeed. Management understanding and buying into the program elevates O&M importance and allows...

195

Cleaning, Maintenance, and Janitorial Needs  

Science Journals Connector (OSTI)

The contamination control facility, including all items that may come into contact with products, requires regular maintenance and cleaning. The products produced in the cleanroom facility are typically sensitive...

Alvin Lieberman

1992-01-01T23:59:59.000Z

196

Sustainable Operations & Maintenance Implementation Support  

E-Print Network [OSTI]

, and purchasing policy: Energy efficiency cannot exist without accountability and organizational support energy efficiency in buildings. Organizational innovation for energy conservation; Organizations face of energy efficiency. Meetings with facilities personnel, maintenance staff, building managers, building oc

197

Maintenance Practices for LED Streetlights  

Broader source: Energy.gov [DOE]

This April 14, 2014 webinar answered important questions about the maintenance and reliability of LED streetlights, and how to take these issues into account when planning and preparing for a...

198

Operations and Maintenance Program Measurement  

Broader source: Energy.gov [DOE]

Operations and maintenance (O&M) measurement tends to focus on reliability as the sole metric. Every Federal agency wants a reliable facility, but this metric alone is not enough to build a...

199

CHP Project Development Handbook (U.S. Environmental Protection Agency CHP Partnership)  

Broader source: Energy.gov [DOE]

Handbook that provides information to potential CHP developers, including CHP project development overview, qualifications, procurement, and operations and maintenance

200

Maintenance of DOE Technical Standards  

Broader source: Energy.gov (indexed) [DOE]

TECHNICAL STANDARDS TECHNICAL STANDARDS PROGRAM PROCEDURES DOE-TSPP-9 Revision: 5 Date: August 1, 2000 MAINTENANCE OF DOE TECHNICAL STANDARDS U.S. Department of Energy Office of Nuclear Safety Policy and Standards Washington, D.C. 20585 DOE-TSPP-9 Maintenance Revision: 5 Date: August 1, 2000 DOE Technical Standards Program i CONTENTS Paragraph Page 1. SCOPE........................................................................................................................................... 1 1.1 Purpose ................................................................................................................... 1 1.2 Applicability.............................................................................................................. 1

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Road and Trail Inventory Goal: map all of the legal and illegal existing roads and  

E-Print Network [OSTI]

, Car, 2WD, 4WD, ORV Trail marking None, Good, Fair, Poor Paved public road Forest road/trail Trail Other (power line) A trail in REALLY poor condition! #12;3/2/2011 3 Road and Trail Point Data Collected Water Hole Trail Sign/Kiosk Trail Structure Trail Damage Trail Stream Crossing ROW Crossing Stone Wall

Schweik, Charles M.

202

HFIR Plant Maintenance - August  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

April 2012 April 2012 2 Managed by UT-Battelle for the U.S. Department of Energy ORNL Isotope Infrastructure Public Release of CASL Infrastructure Software The Lightweight Integrating Multiphysics Environment (LIME), which has formed the infrastructure for the simulation tools being developed within the Consortium for Advanced Simulation of Light-Water Reactors (CASL), has been publicly-released under an open-source license: * http://sourceforge.net/projects/lime1/ 3 Managed by UT-Battelle for the U.S. Department of Energy ORNL Isotope Infrastructure Key Highlights and Activities * Jess Gehin and Syd Ball participated in the Subgroup Technical Meeting under the US- Russia Civil NE Cooperation Action Plan as the respective US Leads for Small Modular Reactors and High-Temperature Gas Reactors.

203

Shaftesbury Road Site The Edinburgh Building  

E-Print Network [OSTI]

.cambridge.org/bookshop By car Visitor parking is available on the Shaftesbury Road site. If visiting the pitt Building-storey car parks identified by a on the map. Alternatively, use the park & Ride facilities identified by a P take a local bus or a taxi (phone panther Taxis on 01223 715715) to the Shaftesbury Road site, or you

Mackenzie, Kirill

204

ENERGY STRATEGY: THE ROAD NOT TAKEN?  

E-Print Network [OSTI]

ENERGY STRATEGY: THE ROAD NOT TAKEN? By Amory B. Lovins Two road5 diverged in a wood, and I-- I are America's formal or de facto energy policies leading us? Where might we choose to go instead? How can we concepts in energy strategy by outlining and contrasting two en- ergy paths tbat the United States might

Kammen, Daniel M.

205

Safety Considerations When Driving on Rural Roads  

E-Print Network [OSTI]

procedures to follow. Characteristics of rural or forest roads Extra caution is required when driving-moving vehicles, animals, debris) · Unusually steep hills or sharp curves Since help may often be difficult.Agricultural or prescribed forest burning may produce smoke on roads. Hazard: Approaching vehicles, livestock or wild animals

Vivoni, Enrique R.

206

Operations & Maintenance Best Practices Guide: Chapter 3  

Broader source: Energy.gov [DOE]

Guide describes chapter 3 of the Operations & Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

207

Chapter 6.14 PROPERTY MAINTENANCE  

E-Print Network [OSTI]

Chapter 6.14 PROPERTY MAINTENANCE Sections: 6.14.010 Findings. 6.14.020 Landscape Maintenance. 6 of landscaping and/or landscape maintenance on private property, including overgrown, dead, or decayed vegetation of the residents of the City of Riverside. (Ord. 6970 § 2, 2007) Section 6.14.020 Landscape maintenance. A

Lyubomirsky, Ilya

208

Module 10: Maintenance and Fueling Guidelines  

Broader source: Energy.gov [DOE]

This course covers safety guidelines for hydrogen, safe maintenance facilities, safety guidelines for hydrogen fueling facilities

209

CRAD, Maintenance Assessment Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Maintenance Assessment Plan Maintenance Assessment Plan CRAD, Maintenance Assessment Plan Performance Objective: An effective facilities maintenance program should optimize the material condition of components and equipment to support safe and effective operations and ensure the peak performance and reliability of those systems and equipment important to operations. Criteria: The program, facility or operation has a Maintenance Implementation Plan (MIP), or equivalent document, which defines and documents the approach to conduct of maintenance. The maintenance organization structure is well defined and understood. Responsibilities, organizational interfaces, and administrative activities are adequately defined and implemented to provide timely availability of parts, materials, and services needed to support the

210

U.S. DEPARTMENT OF ENERGY EERE PROJECT MA>" AGEMENT CENTER NEPA DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

MA>" AGEMENT CENTER MA>" AGEMENT CENTER NEPA DETERMINATION RECIPIENT:Oregon Department of Energy PROJECT TITLE: Oregon EECBG Fonnula - City of Winston Page I of3 STATE: OR Funding Opportunity Announcement Number DE-FOA-OOOOO13 Procurement Instrument Number NEPA Control Number em Number EEO Based on my review crthe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4Sl.I A), I have made the (ollowing determination: ex, EA, EIS APPENDIX AND NUMBER: Description : B1.3 Routine maintenance activities and custodial services for buildings, structures, rights-of-way, infrastructures (e.g .* pathways, roads, and railroads ), vehides and eqUipment, and localized vegetatJon and pest control, dunng which operations may be suspended and resumed. Custodial services are activities to preserve facility appearance, worl

211

Murdock Road Knoxville.TN  

Broader source: Energy.gov (indexed) [DOE]

702 702 Murdock Road Knoxville.TN 37932 Tel: (609) 921-1456 Fax: (609) 92 1-8703 AA\W.nell-one.com March 25,2009 Office of the Assistant General Counsel for Technology Transfer and Intellectual Property U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585 Attn: Technology Transfer Questions Subject: Questions Concerning Technology Transfer Practices at DOE Laboratories (Federal RegisterNol. 73, No. 229/ November 26,2008 /Notices) Dear Mr. Gottlieb, Thank you for the opportunity to respond to the questions published in the Federal Register. As Chief Executive Officer of Nell One Therapeutics, a spin-out company which is in the process of licensing technology from Oak Ridge National Laboratory (ORNL), I found the questions to be highly relevant to our experiences. While many great technologies and capabilities reside in the National Laboratories

212

Project 346  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Sara Pletcher Sara Pletcher Project Manager National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507 304-385-4236 sara.pletcher@netl.doe.gov Gary M. Blythe URS Corporation PO Box 201088 Austin, TX 78720 512-419-5321 gary_blythe@urscorp.com BENCH SCALE KINETICS OF MERCURY REACTIONS IN FGD LIQUORS Background When research into the measurement and control of Hg emissions from coal-fired power plants began in earnest in the early 1990s, it was observed that oxidized mercury can be scrubbed at high efficiency in wet FGD systems, while elemental mercury cannot. In many cases, elemental mercury concentrations were observed to increase slightly across wet FGD systems, but this was typically regarded as within the variability of the measurement methods. However, later measurements have

213

Project 278  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Karen Cohen Karen Cohen Project Manager National Energy Technology Laboratory 626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236 412-386-6667 karen.cohen@netl.doe.gov Ken Nemeth Executive Director Southern States Energy Board 6325 Amherst Court Norcross, GA 30092 770-242-7712 nemeth@sseb.org Sequestration SOUTHEAST REGIONAL CARBON SEQUESTRATION PARTNERSHIP (SECARB) Background The U.S. Department of Energy has selected the seven partnerships of state agencies, universities, and private companies that will form the core of a nationwide network that will help determine the best approaches for capturing and permanently storing gases that can contribute to global climate change. All together, the partnerships include more than 240 organizations, spanning 40 states, three Indian nations, and

214

Project 320  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Philip Goldberg Philip Goldberg Project Manager National Energy Technology Laboratory 626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236 412-386-5806 philip.goldberg@netl.doe.gov Marek Wojtowicz Advanced Fuel Research, Inc. 87 Church Street East Hartford, CT 06108 860-528-9806 marek@AFRinc.com Sequestration CARBON DIOXIDE RECOVERY FROM COMBUSTION FLUE GAS USING CARBON- SUPPORTED AMINE SORBENTS Background In Phase I, Advanced Fuel Research, Inc. will initiate development of a novel sorbent for the removal of carbon dioxide from combustion/incineration flue gas. The sorbent, based on amines supported on low-cost activated carbon, will be produced from scrap tires. Liquid-based amine systems are limited to relatively low concentrations to avoid corrosion. Corrosion should not be a

215

Project 199  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Heino Beckert Heino Beckert Project Manager National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507 304-285-4132 heino.beckert@netl.doe.gov Ramin Yazdani Senior Civil Engineer Yolo County Planning and Public Works Department 292 West Beamer Street Woodland, CA 95695 530-666-8848 ryazdani@yolocounty.org Sequestration Yolo County Landfill Methane Production Compared to Other Landfills FULL-SCALE BIOREACTOR LANDFILL Background Sanitary landfilling is the dominant method of solid waste disposal in the United States, accounting for the disposal of about 217 million tons of waste annually (U.S. EPA, 1997). The annual production of municipal waste in the United States has more than doubled since 1960. In spite of increasing rates of reuse and recycling, population and

216

Project311  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Lang Lang Project Manager National Energy Technology Laboratory 626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236 412-386-4881 david.lang@netl.doe.gov John Bowser Principal Investigator Compact Membrane Systems, Inc. 325 Water Street Wilmington, DE 19804 302-999-7996 john.bowser@compactmembrane.com Sequestration CARBON DIOXIDE CAPTURE FROM LARGE POINT SOURCES Background Capture of carbon dioxide at the source of its emission has been a major focus in greenhouse gas emission control. Current technologies used for capturing CO 2 suffer from inefficient mass transfer and economics. In Phase I, Compact Membrane Systems, Inc. will fabricate and test a membrane-based absorption system for the removal of carbon dioxide from a simulated power-plant flue gas. The stability of the membrane system under various operating conditions

217

Project 333  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

José D. Figueroa José D. Figueroa Project Manager National Energy Technology Laboratory 626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236 412-386-4966 jose.figueroa@netl.doe.gov C. Jeffrey Brinker Sandia Fellow, Sandia National Laboratories Professor of Chemical & Nuclear Engineering The University of New Mexico Advanced Materials Laboratory 1001 University Blvd. SE, Suite 100 Albuquerque, NM 87106 505-272-7627 cjbrink@sandia.gov Sequestration NOVEL DUAL FUNCTIONAL MEMBRANE FOR CONTROLLING CARBON DIOXIDE EMISSIONS FROM FOSSIL FUELED POWER PLANTS Background There is growing concern among climate scientists that the buildup of greenhouse gases (GHG), particularly carbon dioxide, in the atmosphere is affecting the global climate in ways that could have serious consequences. One approach to reducing GHG emissions

218

Condon Wind Project Draft Environmental Impact Statement  

SciTech Connect (OSTI)

BPA needs to acquire resources to meet its customers' load growth. In meeting that need for power, BPA will consider the following purposes: protecting BPA and its customers against risk by diversifying its resource portfolio; assuring consistency with its responsibilities under the Pacific Northwest Electric Power Planning and Conservation Act to encourage the development of renewable resources; meeting customer demand for renewable resources; assuring consistency with its resource acquisition strategy; and meeting the objectives of its Power Business Line's Strategic Plan. The Draft Environmental Impact Statement (DEIS) evaluates the environmental impacts of the Proposed Action (to execute one or more power purchase and transmission services agreements to acquire and transmit up to the full electric output of the proposed Condon Wind Project) and the No Action Alternative. BPA's preferred alternative is the Proposed Action. BPA has also identified the Proposed Action as the environmentally-preferred alternative. The proposed wind project is located on private agricultural land in Gilliam County, Oregon. The 38-acre project site is located within a 4,200-acre study area located on both sides of Oregon Highway 206, approximately 5 miles northwest of the town of Condon. The project would use modern, efficient 600-kilowatt (kW) wind turbines to convert energy in the winds to electricity that would be transmitted over the existing BPA transmission system. The project would consist of one or two phases: the first phase would use 41 wind turbines to yield a capacity of approximately 24.6 megawatts (MW). A second phase (if built) would use 42 wind turbines to yield a capacity of approximately 25.2 MW. For purposes of this DEIS, the size of the project is assumed to be 49.8 MW, built in two phases. Major components of the wind project include wind turbines and foundations, small pad-mounted transformers, an operation and maintenance building, power collection and communication cables, project access roads, meteorological towers on foundations, and a substation. During construction there would also be temporary equipment storage and construction staging areas. The first phase is proposed for construction in late 2001; the second phase could be constructed during spring/summer 2002 or later.

N /A

2001-06-01T23:59:59.000Z

219

Reliability centered maintenance of power transformers and circuit breakers  

SciTech Connect (OSTI)

At the Bonneville Power Administration (BPA), we have historically maintained high voltage equipment. Including transformers and power circuit breakers, on a time driven basis. While this has served our needs in the past, newer methods are needed to effectively maintain the power system in future years. Today aging equipment, maintenance backlogs, and budget constraints are a reality. BPA has initiated a research and development project to examine reliability centered maintenance (RCM) as an alternative to time based maintenance on high voltage equipment. Under RCM, the performance of each place of equipment is to be monitored by observing many operating parameters. For example, with circuit breakers we will observe (measure) the trip time, accumulated contact wear using I{sup 2}T, timing of the mechanism, plus several other parameters. Equipment performing below a predetermined level, or equipment having accumulated a large amount of ``usage`` will receive maintenance. The maintenance will restore full performance and preserve an acceptable service life for that piece of equipment. To develop and evaluate RCM concepts, BPA is installing a prototype system at our Alvey Substation on 4 transformers and 25 breakers.

Purucker, S.L.; Goeltz, R.T. [Oak Ridge National Lab., TN (United States); Hemmelman, K.; Price, R. [Bonneville Power Administration, Van Couver, WA (United States)

1992-08-01T23:59:59.000Z

220

Microsoft Word - CX-AccessRoads-KingCoWA-FY13_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

22, 2013 22, 2013 REPLY TO ATTN OF: KEPR-Covington SUBJECT: Environmental Clearance Memorandum Rick Ross Engineer - TELF-TPP-3 Proposed Action: Covington District Culvert Replacements Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): Appendix B1.3, Routine Maintenance Location: King County, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to replace existing culverts at 12 access road stream crossings that present barriers to fish passage. These improvements will be made on BPA easement access roads within DNR owned and managed lands. BPA will make these improvements by installing new fish friendly culverts and/or bridges at each stream crossing. The current stream crossings do not meet DNR fish passage standards that will be in

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

St. Lucie County Cooperative Extension 8400 Picos Road, Suite 101  

E-Print Network [OSTI]

If Commercial Landscape Maintenance workers want to legally apply "Caution" labeled pesticides including of a chapter 482 "Limited Commercial Landscape Maintenance license". In order to obtain this license Landscape Maintenance Training workshop plus pass a Limited Certification Landscape Maintenance exam

Watson, Craig A.

222

Forest Road Building Regulations | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

You are here You are here Home » Forest Road Building Regulations Forest Road Building Regulations < Back Eligibility Utility Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Schools Retail Supplier Institutional Fuel Distributor Nonprofit Transportation Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info Start Date 09/2010 State Wisconsin Program Type Environmental Regulations The Wisconsin Department of Natural Resources has regulations for building a forest road, if development requires one. Regulations include zoning ordinances and permits for stream crossing, grading, stormwater, and

223

A quadratic algorithm for road coloring  

E-Print Network [OSTI]

The road coloring theorem states that every aperiodic directed graph with constant out-degree has a synchronized coloring. This theorem had been conjectured during many years as the road coloring problem before being settled by A. Trahtman. Trahtman's proof leads to an algorithm that finds a synchronized labeling with a cubic worst-case time complexity. We show a variant of his construction with a worst-case complexity which is quadratic in time and linear in space. We also extend the road coloring theorem to the periodic case.

Bal, Marie-Pierre

2008-01-01T23:59:59.000Z

224

Drive alignment pays maintenance dividends  

SciTech Connect (OSTI)

Proper alignment of the motor and gear drive on conveying and processing equipment will result in longer bearing and coupling life, along with lower maintenance costs. Selecting an alignment free drive package instead of a traditional foot mounted drive and motor is a major advancement toward these goals. 4 photos.

Fedder, R. [Rexnord Industries, Milwaukee, WI (United States)

2008-12-15T23:59:59.000Z

225

Dynamic Maintenance of Service Orchestrations  

E-Print Network [OSTI]

-Rocquencourt, France Valérie Issarny INRIA Paris-Rocquencourt, France ABSTRACT Service-oriented architectures evolved/orchestration of services. One of the next challenges in this field is the maintenance of service-oriented architectures orchestrations. 1. INTRODUCTION Service Oriented Architecture (SOA) is an architectural style that emerged

Boyer, Edmond

226

Renewable Energy Project Funding | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Renewable Energy Project Funding Renewable Energy Project Funding Renewable Energy Project Funding October 16, 2013 - 5:15pm Addthis Renewable Energy Project Funding Planning, Programming & Budgeting Building Design Project Construction Commissioning Operations & Maintenance Federal energy projects require funding to generate results. Agencies trying to stretch their capital budget for a construction project should investigate renewable energy project funding options outside the traditional appropriated budget process. Carefully matching available funding tools with specific project needs can make the difference between a stalled, unfunded renewable energy project and a successful project that generates energy and cost savings. Federal agencies may be able to use tools to finance renewable energy

227

EIS-0411: Transmission Agency of Northern California Transmission Project  

Broader source: Energy.gov [DOE]

This EIS is for the Western Area Power Administration construction, operation, and maintenance of the proposed transmission agency of Northern California Transmission Project, California.

228

On-road remote sensing of vehicle emissions in  

E-Print Network [OSTI]

On-road remote sensing of vehicle emissions in the Auckland Region August 2003 Technical 1877353000 www.arc.govt.nz #12;TP 198 On-Road Remote Sensing of Vehicle Emissions in the Auckland Region #12;Page i TP 198 On-Road Remote Sensing of Vehicle Emissions in the Auckland Region On-road remote sensing

Denver, University of

229

The Political Economy of Private Roads David Levinson  

E-Print Network [OSTI]

to the generating plants in the electricity sector. What are not private, of course, are the roads them- selves4 The Political Economy of Private Roads David Levinson CosaNostra Pizza #3569 is on Vista Road in road privatization and alternative financing, not just by science fiction writ- ers, anarchists

Levinson, David M.

230

Steam turbine maintenance and repair technology: Reducing planned-outage costs  

SciTech Connect (OSTI)

The North American Electric Reliability Council (NAERC) reported that the average loss of equivalent availability per outage for a major fossil turbine overhaul is 323,000 MW-HR. The Electric Power Research Institute (EPRI) Generation and Storage Division, is in the first phase of a major research project to reduce the duration and/or frequency of steam turbine maintenance outages. This project consists of an assessment of the current state-of-the-art turbine maintenance and repair techniques and technologies. It is based on a review of current turbine maintenance practices of the US, European, Japanese, and Australian utility industries. Emphasized are maintenance and repair activities that have the most significant impact on outage duration or frequency. Twenty-six key turbine maintenance activities and the current best techniques were identified for use by utility maintenance personnel. Overall outage durations could be reduced if the duration of these activities were shortened or if they were performed more effectively. Recommended projects for development of advanced steam turbine maintenance technology were identified. 29 refs., 46 figs., 9 tabs.

Grace, H.P.; McClintock, M. (General Physics Corp., Columbia, MD (USA)); Lamping, G. (Southwest Research Inst., San Antonio, TX (USA))

1990-04-01T23:59:59.000Z

231

Rattlesnake Road Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Rattlesnake Road Wind Farm Rattlesnake Road Wind Farm Jump to: navigation, search Name Rattlesnake Road Wind Farm Facility Rattlesnake Road Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Horizon Developer Horizon Energy Purchaser Constellation Energy/PG&E Location Gilliam County west of Arlington OR Coordinates 45.700461°, -120.280581° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.700461,"lon":-120.280581,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

232

Understanding Road Usage Patterns in Urban Areas  

E-Print Network [OSTI]

In this paper, we combine the most complete record of daily mobility, based on large-scale mobile phone data, with detailed Geographic Information System (GIS) data, uncovering previously hidden patterns in urban road ...

Wang, Pu

233

HCEI Road Map: 2011 Edition (Brochure)  

Office of Energy Efficiency and Renewable Energy (EERE)

This road map outlines the 2011 key goals and strategies of the Hawaii Clean Energy Initiative, was founded based on a Memorandum of Understanding between the State of Hawaii and the U.S. Department of Energy in 2008.

234

Project Information Form Project Title Do California Highways Act as Barriers to Gene Flow for Ground-Dwelling  

E-Print Network [OSTI]

(by each agency or organization) Caltrans $78,395 Total Project Cost $78,395 Agency ID or ContractProject Information Form Project Title Do California Highways Act as Barriers to Gene Flow of Research Project Roads can act as significant barriers to wildlife dispersal, creating small fragmented

California at Davis, University of

235

Computerized Maintenance Management Systems | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Program Areas » Operations & Maintenance » Computerized Program Areas » Operations & Maintenance » Computerized Maintenance Management Systems Computerized Maintenance Management Systems October 7, 2013 - 9:35am Addthis Computerized maintenance management systems (CMMS) are a type of management software that perform functions in support of operations and maintenance (O&M) programs. The software automates most of the logistical functions performed by O&M staff. Capabilities Typical CMMS functions depend on the complexity of the system chosen. Examples include: Work order generation, prioritization, and tracking by equipment and/or component. Work orders often can be sorted by equipment, date, person responding, etc. Tracking scheduled and unscheduled maintenance activities Storing technical documentation and maintenance procedures by

236

Federal Energy Management Program: Maintenance Types  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Maintenance Types Maintenance Types Proper operations and maintenance (O&M) goes beyond repairing equipment after it breaks. Several maintenance strategies exist to prevent systems disrepair and degradation. A combination of the following can ensure an optimal blend of cost and life-cycle effectiveness: Reactive Maintenance: Follows a "run it until it breaks" strategy. No action or effort is taken to maintain equipment, prevent failure, or ensure life of the system - even if actions are suggested by the manufacturer. Preventive Maintenance: Refers to a series of actions performed on calendar time or machine run time schedules. Predictive Maintenance: Strives to detect the onset of equipment degradation and address the problems as they are identified. Several predictive maintenance technologies exist.

237

Maintenance cost studies of present aircraft subsystems  

E-Print Network [OSTI]

This report describes two detailed studies of actual maintenance costs for present transport aircraft. The first part describes maintenance costs for jet transport aircraft broken down into subsystem costs according to an ...

Pearlman, Chaim Herman Shalom

1966-01-01T23:59:59.000Z

238

Invertible Program Restructurings for Continuing Modular Maintenance  

E-Print Network [OSTI]

Invertible Program Restructurings for Continuing Modular Maintenance Julien Cohen ASCOLA team (EMN in main- tenance with invertible program transformations. We illustrate this on the typical Expression problems with our approach. Keywords-modular maintenance; restructuring; invertible pro- gram

Paris-Sud XI, Université de

239

Effects of dairy intake on weight maintenance  

E-Print Network [OSTI]

, randomized trial. Weight loss was baseline to 3 months, weight maintenance was 4 to 9 months. Participants were maintained randomly assigned to low dairy ( 3 servings/d) diets for the maintenance phase. Three...

Zemel, Michael B.; Donnelly, Joseph E.; Smith, Bryan K.; Sullivan, Debra K.; Richards, Joanna; Morgan-Hanusa, Danielle; Mayo, Matthew S.; Sun, Xiaocun; Cook-Wiens, Galen; Bailey, Bruce W.; Van Walleghen, Emily L.; Washburn, Richard A.

2008-10-24T23:59:59.000Z

240

PROJECT SUMMARY REPORT 1515-S IMPLEMENTATION OF AN AUTOMATED  

E-Print Network [OSTI]

. Haas, Kamel Saidi, Yong-Kwon Cho, Walter Fagerlund, Hyoungkwan Kim, and Young-Suk Kim CENTER. Report Date August 1999 6. Performing Organization Code7. Author(s) Dr. Carl T. Haas, Kamel Saidi, Yong OF AN AUTOMATED ROAD MAINTENANCE MACHINE (ARMM) by Dr. Carl T. Haas, Kamel Saidi, Yong-Kwon Cho, Walter Fagerlund

Texas at Austin, University of

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Operations & Maintenance Best Practices Guide: Chapter 9  

Broader source: Energy.gov [DOE]

Guide describes chapter 9 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

242

Operations & Maintenance Best Practices Guide: Front Matter  

Broader source: Energy.gov [DOE]

Guide describes the front matter of the Operations and Maintenance Best Practices: a Guide to Achieving Operational Efficiency.

243

Operations & Maintenance Best Practices Guide: Appendix c  

Broader source: Energy.gov [DOE]

Guide describes Appendix C of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

244

Operations & Maintenance Best Practices Guide: Chapter 7  

Broader source: Energy.gov [DOE]

Guide describes chapter 7 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

245

Operations & Maintenance Best Practices Guide: Chapter 5  

Broader source: Energy.gov [DOE]

Guide describes chapter 5 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

246

Reliability centered maintenance (RCM) products - future  

SciTech Connect (OSTI)

This paper summarizes products related to RCM of power systems which will soon be available. The titles include: substation RCM handbook and software; substation RCM driven productive maintenance; transmission RCM evaluation; transmission inspection and maintenance workstation; transmission inspection and detection methods; substation RCM implementation and software support; substation maintenance management workstation; transmission RCM handbook and software; transmission inspection and maintenance workstation - TC; distribution RCM handbook and software; transmission RCM implementation and software support; and distribution RCM implementation and software support.

Lyons, P.F.

1996-08-01T23:59:59.000Z

247

Operations & Maintenance Best Practices Guide: Chapter 8  

Broader source: Energy.gov [DOE]

Guide describes chapter 8 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

248

Collector Field Maintenance: Distributed Solar Thermal Systems  

Science Journals Connector (OSTI)

This paper reports on recent operation and maintenance experiences with distributed solar thermal systems. Although some information on system-...

E. C. Boes; E. C. Cameron; E. L. Harley

1986-01-01T23:59:59.000Z

249

Preventive Maintenance Strategies for Compressed Air Systems  

Broader source: Energy.gov [DOE]

This tip sheet discusses preventive maintenance strategies for compressed air systems to avoid high equipment repair and replacement costs.

250

Operations & Maintenance Best Practices Guide: Chapter 10  

Broader source: Energy.gov [DOE]

Guide describes chapter 10 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

251

Operations & Maintenance Best Practices Guide: Chapter 6  

Broader source: Energy.gov [DOE]

Guide describes chapter 6 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

252

Operations & Maintenance Best Practices Guide: Appendix a  

Broader source: Energy.gov [DOE]

Guide describes Appendix A of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

253

Laboratory services series: a programmed maintenance system  

SciTech Connect (OSTI)

The diverse facilities, operations and equipment at a major national research and development laboratory require a systematic, analytical approach to operating equipment maintenance. A computer-scheduled preventive maintenance program is described including program development, equipment identification, maintenance and inspection instructions, scheduling, personnel, and equipment history.

Tuxbury, D.C.; Srite, B.E.

1980-01-01T23:59:59.000Z

254

Categorical Exclusion for Maintenance Work  

Broader source: Energy.gov (indexed) [DOE]

Maintenance Work Maintenance Work along the Electrical District 5 to Saguaro segment (41/4 to 58/5) of the Maricopa-Saguaro 115-kV Transmission Line, between Friendly Comers and Marana, Pinal County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western plans to conduct maintenance work to maintain or improve the reliability and safety of electrical transmission along 17 miles of the Test Track (formerly Maricopa)-Saguaro 115-kV Transmission Line between Electrical District 5 and Saguaro Steam Plant Substations. The work includes replacing wood poles, cross arms, and knee braces in-kind at 27 structures (41/4-8, 4214, 43/6, 4417, 45/4,46/6,47/2,49/2,49/6,50/2,50/6,50/8,51/4, 52/3, 54/3, 5517, 56/1 57/1-3, 57/8 & 58/2-3), because the wood poles failed stability tests, cross arms are beyond

255

IRF-World Road Statistics | Open Energy Information  

Open Energy Info (EERE)

IRF-World Road Statistics IRF-World Road Statistics Jump to: navigation, search Tool Summary LAUNCH TOOL Name: IRF-World Road Statistics Agency/Company /Organization: International Road Statistics Focus Area: Transportation, Economic Development Resource Type: Dataset Website: www.irfnet.org/statistics.php Cost: Paid IRF-World Road Statistics Screenshot References: IRF-World Road Statistics[1] "IRF World Road Statistics (WRS) compiles the most up-to-date official international road, traffic and transport data. The publication further provides a selection of the latest Sustainable Development Indicators and other data of key relevance, not only to industry and business but also to leading international organisations and financial institutions." References ↑ "IRF-World Road Statistics"

256

Pacific Northwest Laboratory Maintenance Implementation plan  

SciTech Connect (OSTI)

This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory's (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change {number sign}3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services' current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

Bright, J.D.

1992-06-01T23:59:59.000Z

257

Pacific Northwest Laboratory Maintenance Implementation plan  

SciTech Connect (OSTI)

This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory`s (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change {number_sign}3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services` current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

Bright, J.D.

1992-06-01T23:59:59.000Z

258

Building Energy Software Tools Directory: Maintenance Edge  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Maintenance Edge Maintenance Edge Maintenance Edge logo Maintenance Edge is a suite of online Software as a Service (SaaS) facility management tools that gives control and management over buildings without a capital investment. Maintenance Edge enables you to combine work order, planned maintenance, work order wireless, and critical alarms with the option of adding inventory. Fully implemented, Maintenance Edge will cut labor time, increase energy efficiencies, save on capital expenditures, and save on budget and management time. Features include: easy/user-friendly work order requesting, unlimited users, seven different user roles (limits data users can see), no capital or hardware costs required, access to data anywhere anytime, easy-to-click reporting on all the data in your system,

259

Petroleum Service Projects in the Gulf of Guinea  

E-Print Network [OSTI]

carried out by the OIS group in the gulf of Guinea. The following are the specific projects in the Gulf of Guinea that I participated in: Managing delivering, maintenance and marketing of offshore vessels, Offshore pipe laying project, Integrated pipeline...

Ken-Worgu, Kenneth Chukwumeka

2011-10-21T23:59:59.000Z

260

End of the road for Roadrunner  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

End of the road for Roadrunner End of the road for Roadrunner End of the road for Roadrunner Roadrunner, the first supercomputer to break the once-elusive petaflop barrier-one million billion calculations per second-will be decommissioned on Sunday, March 31. March 29, 2013 Roadrunner, the first supercomputer to break the once-elusive petaflop barrier-one million billion calculations per second-will be decommissioned on Sunday, March 31. Roadrunner will be decommissioned on March 31. Contact Kevin Roark Communications Office (505) 665-9202 Email Roadrunner got everyone thinking in new ways about how to build and use a supercomputer. Once the World's Fastest Supercomputer; Central to the Success of Stockpile Stewardship LOS ALAMOS, N. M., March 29, 2013-Roadrunner, the first supercomputer to

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

HCEI Road Map: 2011 Edition (Brochure)  

Broader source: Energy.gov (indexed) [DOE]

Road Map Road Map 2011 Edition 2 www.hawaiicleanenergyinitiative.org The Hawaii Clean Energy Initiative (HCEI) was founded based on a Memorandum of Understanding (MOU) between the State of Hawaii and the U.S. Department of Energy on Jan. 28, 2008. Upon inception, the State and the Department worked to form a series of working groups incorporating a variety of stakeholders throughout the state, including local government, not-for-profit organizations, private sector companies, trade associations, Department of Defense representatives (including PACOM) and academic organizations, among others. These working groups form

262

HCEI Road Map: 2011 Edition (Brochure)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

HCEI Road Map HCEI Road Map 2011 Edition 2 www.hawaiicleanenergyinitiative.org The Hawaii Clean Energy Initiative (HCEI) was founded based on a Memorandum of Understanding (MOU) between the State of Hawaii and the U.S. Department of Energy on Jan. 28, 2008. Upon inception, the State and the Department worked to form a series of working groups incorporating a variety of stakeholders throughout the state, including local government, not-for-profit organizations, private sector companies, trade associations, Department of Defense representatives (including PACOM) and academic organizations, among others. These working groups form

263

No maintenance -- no energy efficiency  

SciTech Connect (OSTI)

Field investigations illustrate that it is not realistic to expect new high-tech equipment to function for a full life expectancy at high efficiency without significant operations and maintenance (O&M). A simple walk through inspection of most buildings reveals extensive equipment that is being operated on manual override, is incorrectly adjusted and operating inefficiently, or is simply inoperative. This point is illustrated with two examples at Robins Air Force Base, Georgia. The first describes development of a comprehensive, base-wide, steam trap maintenance program. The second describes a measured evaluation from a typical office building. The objective of both examples was to assess the importance of proper O&M. The proposed ``O&M First`` philosophy will result in more efficient building HVAC operation, provide improved services to the building occupants, and reduce energy consumption and unscheduled equipment repair/replacement. Implementation of a comprehensive O&M program will result in a 15--25% energy savings. The O&M foundation that is established will allow other energy conservation activities such is demand side management or energy management and control systems, to achieve and maintain their expected energy savings.

Szydlowski, R.F.; Schliesing, J.S.; Winiarski, D.W.

1994-12-01T23:59:59.000Z

264

Project Year Project Title  

E-Print Network [OSTI]

the cost of the project to labor only. The efficacy of the examples will be assessed through their useProject Year 2012-2013 Project Title Sight-Reading at the Piano Project Team Ken Johansen, Peabody) Faculty Statement The goal of this project is to create a bank of practice exercises that student pianists

Gray, Jeffrey J.

265

Project Year Project Team  

E-Print Network [OSTI]

design goals for this project include low cost (less than $30 per paddle) and robustness. The projectProject Year 2001 Project Team Faculty: Allison Okamura, Mechanical Engineering, Whiting School Project Title Haptic Display of Dynamic Systems Audience 30 to 40 students per year, enrolled

Gray, Jeffrey J.

266

Project Year Project Team  

E-Print Network [OSTI]

-year section of the summer project will cost $1344.) This project will be measured by the CER surveys conductedProject Year 2005 Project Team Sean Greenberg, Faculty, Philosophy Department, Krieger School of Arts & Sciences; Kevin Clark, Student, Philosophy Department, Krieger School of Arts & Sciences Project

Gray, Jeffrey J.

267

Geothermal Data Development, Collection, and Maintenance | Open Energy  

Open Energy Info (EERE)

Page Page Edit History Facebook icon Twitter icon » Geothermal Data Development, Collection, and Maintenance Jump to: navigation, search Geothermal ARRA Funded Projects for Geothermal Data Development, Collection, and Maintenance Loading map... {"format":"googlemaps3","type":"ROADMAP","types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"limit":200,"offset":0,"link":"all","sort":[""],"order":[],"headers":"show","mainlabel":"","intro":"","outro":"","searchlabel":"\u2026 further results","default":"","geoservice":"google","zoom":false,"width":"600px","height":"350px","centre":false,"layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","icon":"","visitedicon":"","forceshow":true,"showtitle":true,"hidenamespace":false,"template":false,"title":"","label":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"locations":[{"text":"

268

Alternative Fuels Data Center: Electric Vehicle (EV) Road User Assessment  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Road User Assessment System Pilot to someone by E-mail Road User Assessment System Pilot to someone by E-mail Share Alternative Fuels Data Center: Electric Vehicle (EV) Road User Assessment System Pilot on Facebook Tweet about Alternative Fuels Data Center: Electric Vehicle (EV) Road User Assessment System Pilot on Twitter Bookmark Alternative Fuels Data Center: Electric Vehicle (EV) Road User Assessment System Pilot on Google Bookmark Alternative Fuels Data Center: Electric Vehicle (EV) Road User Assessment System Pilot on Delicious Rank Alternative Fuels Data Center: Electric Vehicle (EV) Road User Assessment System Pilot on Digg Find More places to share Alternative Fuels Data Center: Electric Vehicle (EV) Road User Assessment System Pilot on AddThis.com... More in this section... Federal State Advanced Search

269

Road to Fuel Savings: GM Technology Ramps Up Engine Efficiency...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Road to Fuel Savings: GM Technology Ramps Up Engine Efficiency Road to Fuel Savings: GM Technology Ramps Up Engine Efficiency August 14, 2014 - 11:25am Addthis Pictured here is an...

270

Second Line of Defense: Electronic Maintenance Reports, Local Maintenance Provider User Guide, Rev. 3  

SciTech Connect (OSTI)

The Electronic Maintenance Report forms allow Local Maintenance Providers (LMP) and other program staff to enter maintenance information into a simple and secure system. This document describes the features and information required to complete the Maintenance Report forms. It is expected that all Corrective Maintenance Reports from LMPs will be submitted electronically into the SLD Portal. As an exception (e.g., when access to the SLD Portal is unavailable), Maintenance Reports can be submitted via a secure Adobe PDF form available through the Sustainability Manager assigned to each country.

Leigh, Richard J.

2012-09-01T23:59:59.000Z

271

NEPA REVIEW LASO-10-002 CATEGORICAL EXCLUSION PAJARITO ROAD RIGHT-OF-WAY SHIFT AT TA-50 AND TA-55  

Broader source: Energy.gov (indexed) [DOE]

REVIEW REVIEW LASO-10-002 CATEGORICAL EXCLUSION PAJARITO ROAD RIGHT-OF-WAY SHIFT AT TA-50 AND TA-55 1. DESCRIPTION OF PROPOSED ACTION: LANL proposes to shift a segment of Pajarito Road slightly to the south along the edge of Two-Mile Canyon in the vicinity of TA-55. The existing centerline would be moved between 36 feet and 56 feet depending on final designs. This shift would address the need to integrate security requirements related to the Chemistry and Metallurgy Building Replacement Project (CMRR) and the Nuclear Materials Safeguards and Security Upgrades Project (NMSSIJP) - specifically placement of the Perimeter Intrusion Detection, Assessment, and Delay System fence improvements in proximity to Pajarito Road. Pajarito Road is not open to the public and is secured to preclude unauthorized access to the facilities between

272

Predictive Maintenance Technologies | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Maintenance Technologies Maintenance Technologies Predictive Maintenance Technologies October 28, 2013 - 10:15am Addthis Several diagnostic technologies and best practices are available to assist Federal agencies with predictive maintenance programs. Chapter 6 of the FEMP O&M Best Practices Guide (PDF 721 KB) outlines these technologies in detail. The full guide is also available (PDF 3.3 MB). Predictive maintenance technologies include: Thermography: Infrared imaging is used to generate visual images that identify variations in the infrared radiance of object surfaces. This method can be used to detect system surface wear, leaks, or failures. Lubricant and Wear Particle Analysis (a.k.a. Oil Analysis): Detailed analysis is taken to determine needed maintenance based on lubrication

273

Cellulosic Biofuels and the Road to Energy Security  

Science Journals Connector (OSTI)

Cellulosic Biofuels and the Road to Energy Security ... And we badly need some operating commercial scale cellulosic biofuel plants. ...

Bruce E. Dale

2011-11-07T23:59:59.000Z

274

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Louise Pasternack, Chemistry Department, Krieger School, Krieger School of Arts & Sciences Project Title Introductory Chemistry Lab Demonstrations Audience an interactive virtual lab manual that will facilitate understanding of the procedures and techniques required

Gray, Jeffrey J.

275

"MBUF Demo" "Mn Road Fee Test"  

E-Print Network [OSTI]

(40 mpg) Electric Vehicle (non-gas powered) State Tax * Federal Tax ** State Tax * Federal Tax"MBUF Demo" "Mn Road Fee Test" "IntelliDrive Connected Vehicles for Safety, Mobility and User Fee Overview Six Months In-Vehicle Data Collection Participant Recruited Equipment Deployed First Odometer

Minnesota, University of

276

Keep your eyes on the road  

Science Journals Connector (OSTI)

... cruising the strip in your custom convertible. You turn your head to admire an attractive pedestrian. So far, so cool - but what?s stopping you steering off the road ... your neck. OK, fine - but what happens when you spot that head-turning pedestrian? The clue comes from experiments with simulators. These are rather like video games, ...

Henry Gee

1998-11-19T23:59:59.000Z

277

Charing Cross Hospital Fulham Palace Road  

E-Print Network [OSTI]

Charing Cross Hospital Fulham Palace Road Fulham Cemetery Fulham High Street Putney Church Fulham Broadway West Brompton Empress State Building Chelsea and Westminster Hospital Victoria Coach Station Hall for London Aquarium and London Eye Roehampton Earl Spencer Roehampton Queen Mary's Hospital Barnes

278

On the road to sustainable development  

Science Journals Connector (OSTI)

This paper discusses two of the several models developed by the author over the past few years that attempt to portray an understanding of sustainable development. The first, an overview model, depicts a current understanding of SD. The second, a process model, positions role of education on the road to SD. Both models recognise the verity of interdisciplinary approach to and resolution environmental issues.

M.B. Neace

1999-01-01T23:59:59.000Z

279

FACILITY MAINTENANCE MANAGEMENT QUALIFICATION STANDARD REFERENCE GUIDE  

Broader source: Energy.gov (indexed) [DOE]

Facility Facility Maintenance Management Qualification Standard Reference Guide NOVEMBER 2009 Table of Contents i FIGURES...................................................................................................................................... iv TABLES........................................................................................................................................ iv ACRONYMS ................................................................................................................................. v PURPOSE...................................................................................................................................... 1 SCOPE ...........................................................................................................................................

280

FAQS Reference Guide Facility Maintenance Management  

Broader source: Energy.gov [DOE]

This reference guide addresses the competency statements in the April 2014 edition of DOE Standard DOE-STD-1181-2014, Facility Maintenance Management Functional Area Qualification Standard.

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Recent progress in road and lane detection: a survey  

Science Journals Connector (OSTI)

The problem of road or lane perception is a crucial enabler for advanced driver assistance systems. As such, it has been an active field of research for the past two decades with considerable progress made in the past few years. The problem was confronted ... Keywords: Advanced driver assistance systems, Lane detection, Road detection, Road segmentation

Aharon Bar Hillel, Ronen Lerner, Dan Levi, Guy Raz

2014-04-01T23:59:59.000Z

282

Simultaneous Measurement of On-Road Vehicle Emissions and Traffic Flow Using Remote Sensing and an Area-Wide  

E-Print Network [OSTI]

, headway, vehicle type) were simultaneously measured using a video-based area-wide traffic detection system collected via conventional and advanced vehicle monitoring systems. The project is sponsored1 Simultaneous Measurement of On-Road Vehicle Emissions and Traffic Flow Using Remote Sensing

Frey, H. Christopher

283

Detection of Defects in Road Surface by a Vision N. T. Sy M. Avila, S. Begot and J. C. Bardet  

E-Print Network [OSTI]

. Bardet PRISME Institute-MCDS Team - Orleans University - IUT Chateauroux - France ) Vectra Road on a set of image processing tasks : bi-level thresholding, morphological operation, and projection. The method have been tested on three kinds of images: the first ones are images taken in laboratory in static

Paris-Sud XI, Université de

284

Project Year Project Team  

E-Print Network [OSTI]

(Karl) Zhang, Undergraduate Student, Biomedical Engineering, Whiting School of Engineering; Cheryl Kim Audio, Digital Video Project Abstract The goal of this project is to develop online modular units

Gray, Jeffrey J.

285

Line Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(PDCI) Upgrade Project Whistling Ridge Energy Project Line Rebuild, Relocation and Substation Projects Wind Projects Line Projects BPA identifies critical infrastructure and...

286

Risk Based Maintenance Optimization using Probabilistic Maintenance Quantification Models of Circuit Breaker  

E-Print Network [OSTI]

and maintenance techniques of the component. The model is based on the concept of representing the component life time by several deterioration stages. Inspection and maintenance is introduced at each stage and model parameters are defined. A sensitivity analysis...

Natti, Satish

2010-01-14T23:59:59.000Z

287

Despite increasing transportation related activities on rangelands globally, few tools exist for assessing and monitoring impacts of roads, road  

E-Print Network [OSTI]

and management but located far from roads and trails. No modification (careful of buried pipelines). See belowPenetrometer3 Qualitative assessment designed to capture how road is altering landscape hydrology where transect crosses road for later splitting of points on and off travel way. Gap intercept2 Collect

288

Life Cycle Assessment Comparing the Use of Jatropha Biodiesel in the Indian Road and Rail Sectors  

SciTech Connect (OSTI)

This life cycle assessment of Jatropha biodiesel production and use evaluates the net greenhouse gas (GHG) emission (not considering land-use change), net energy value (NEV), and net petroleum consumption impacts of substituting Jatropha biodiesel for conventional petroleum diesel in India. Several blends of biodiesel with petroleum diesel are evaluated for the rail freight, rail passenger, road freight, and road-passenger transport sectors that currently rely heavily on petroleum diesel. For the base case, Jatropha cultivation, processing, and use conditions that were analyzed, the use of B20 results in a net reduction in GHG emissions and petroleum consumption of 14% and 17%, respectively, and a NEV increase of 58% compared with the use of 100% petroleum diesel. While the road-passenger transport sector provides the greatest sustainability benefits per 1000 gross tonne kilometers, the road freight sector eventually provides the greatest absolute benefits owing to substantially higher projected utilization by year 2020. Nevertheless, introduction of biodiesel to the rail sector might present the fewest logistic and capital expenditure challenges in the near term. Sensitivity analyses confirmed that the sustainability benefits are maintained under multiple plausible cultivation, processing, and distribution scenarios. However, the sustainability of any individual Jatropha plantation will depend on site-specific conditions.

Whitaker, M.; Heath, G.

2010-05-01T23:59:59.000Z

289

Project Year Project Title  

E-Print Network [OSTI]

that incorporate video taped procedures for student preview. Solution This project will create videos for more to study the procedure and techniques before coming to class. Our previous fellowship project addressedProject Year 2009 Project Title Enhancing Biology Laboratory Preparation through Video

Gray, Jeffrey J.

290

Project Year Project Team  

E-Print Network [OSTI]

, there is no resource available to view the procedure before class. Solution The purpose of this project is to capture available to view the procedure before class. The purpose #12;of this project is to capture variousProject Year 2007 Project Team Kristina Obom, Faculty, Advanced Academic Programs, Krieger School

Gray, Jeffrey J.

291

Project Year Project Title  

E-Print Network [OSTI]

Project Year 2013-2014 Project Title German Online Placement Exam Project Team Deborah Mifflin to increased cost. As well, it lacked listening comprehension, writing and speaking components providing support, we will use Blackboard for this project. The creation will require numerous steps

Gray, Jeffrey J.

292

ITTF-016 Website Development-Maintenance Log 09_0909 EOTA - Business Form  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6 Website Development-Maintenance Log 09_0909 6 Website Development-Maintenance Log 09_0909 EOTA - Business Form Document Title: ITTP-015 Web Site Development / Maintenance Document Number: Website Development and Maintenance log ITT Melissa Otero N/A Referenced Documents: Parent Document: ITTF-016 Rev. 11_0419 Approvers: Melissa Otero Document Owner: Ben Aragon Backup Owner: Notify of Changes: A B 08_0818 Revision History: Rev. Description of Change Intitial Release. Added headings to address to include: Performance Requirements, Statutory and Regulatory Requirements, Information from Previous Similar Designs, and Other Requirements. Added additional column to indicate "Estimated Completion Date" of WSD projects. "Design Verification Complete" and "Design Validation Complete" columns removed from log.

293

Software Testing and Maintenance 1 Regression Testing  

E-Print Network [OSTI]

1 Software Testing and Maintenance 1 Regression Testing Introduction Test Selection Test Minimization Test Prioritization Summary Software Testing and Maintenance 2 What is it? Regression testing refers to the portion of the test cycle in which a program is tested to ensure that changes do not affect

Lei, Jeff Yu

294

Operations and Maintenance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Program Areas » Operations and Maintenance Program Areas » Operations and Maintenance Operations and Maintenance October 4, 2013 - 5:07pm Addthis Federal facilities rely on pumps, motors, fans, and other mechanical systems for everyday operations. These systems must be maintained and operated correctly to reach their full potential. Well-executed operations and maintenance (O&M) programs promote energy efficiency and life cycle performance and can save Federal agencies 5% to 20% on annual energy bills without significant capital investments. Learn about: Federal Requirements: Look up O&M-related requirements that Federal agencies must meet as outlined by law and executive order Management Process: Learn about the operations and maintenance management process Commissioning: Get an overview of commissioning processes

295

Federal Energy Management Program: Operations and Maintenance Contacts  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Contacts to someone by E-mail Contacts to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Contacts on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Contacts on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Contacts on Google Bookmark Federal Energy Management Program: Operations and Maintenance Contacts on Delicious Rank Federal Energy Management Program: Operations and Maintenance Contacts on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Contacts on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types

296

Federal Energy Management Program: Reliability-Centered Maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Reliability-Centered Maintenance to someone by E-mail Share Federal Energy Management Program: Reliability-Centered Maintenance on Facebook Tweet about Federal Energy Management Program: Reliability-Centered Maintenance on Twitter Bookmark Federal Energy Management Program: Reliability-Centered Maintenance on Google Bookmark Federal Energy Management Program: Reliability-Centered Maintenance on Delicious Rank Federal Energy Management Program: Reliability-Centered Maintenance on Digg Find More places to share Federal Energy Management Program: Reliability-Centered Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems

297

Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.  

SciTech Connect (OSTI)

Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA's power system. This document -- the 1992 OM R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction's critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA's ability to accomplish its OM R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

298

Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.  

SciTech Connect (OSTI)

Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM&R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA`s power system. This document -- the 1992 OM&R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction`s critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA`s ability to accomplish its OM&R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

299

Timber Road II | Open Energy Information  

Open Energy Info (EERE)

II II Jump to: navigation, search Name Timber Road II Facility Timber Road II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Horizon Wind Energy Developer Horizon Wind Energy Energy Purchaser American Electric Power Location Near Payne OH Coordinates 41.023524°, -84.717185° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.023524,"lon":-84.717185,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

300

EPA Energy Strategy For The Road Ahead  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Strategy Strategy for the Road Ahead Scenario Thinking for Business Executives and Corporate Boards 2007 GBN Global Business Network * Energy Strategy for the Road Ahead Printed on 100% recycled paper Copyright 2007 Global Business Network, a member of the Monitor Group. The U.S. Environmental Protection Agency (U.S. EPA) and its ENERGY STAR ® Program supported this effort. We encourage readers to use and share the content of this report, with the understanding that it is the intellectual property of Global Business Network and U.S. EPA ENERGY STAR ® , and that full attribution is required. 101 Market Street, Suite 1000 * San Francisco, CA 94105 * Telephone: (415) 932-5400 * Fax: (415) 932-5401

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Early Cook County Roads -- Part Two  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Two Two Nature Bulletin No. 739 January 18, 1964 Forest Preserve District of Cook County Seymour Simon, President Roberts Mann, Conservation Editor EARLY COOK COUNTY ROADS -- PART TWO -- THE PLANK ROAD ERA For ten years after Chicago, with a population of 4,170, was chartered as a city in 1837, its commerce and growth were crippled by wretched transportation to and from the hinterlands. During many periods of each year it was surrounded and isolated by mud. To be sure, there were dirt thoroughfares in all directions, graded and drained as best they could in those days, but not surfaced. No one who has never experienced it can appreciate how gooey and gluey a black prairie soil can be when wet. A wagon's wheels often become solid cylinders of mud as wide as a bass drum.

302

Projectivities and Projective Embeddings  

Science Journals Connector (OSTI)

In this chapter, we aim to prove some of the main achievements in the theory of generalized polygons. First, we want to show what the little projective group and the groups of projectivities of some Moufang po...

Hendrik van Maldeghem

1998-01-01T23:59:59.000Z

303

Advanced Maintenance Services for Promoting Sustainability  

Science Journals Connector (OSTI)

Abstract Ecology and industry, which have been many times considered as antagonists, are now associated together in the sustainability concept to support the three social / economic / environment pillars. In that way, industrial enterprises and more precisely manufacturing ones seek to integrate environment into their strategy by conducting an innovative rationalization of the production as promoted by industrial ecology and circular economy paradigms. This rationalization is favoring the evolution from product to a Product-Service Systems approach (PSS). The continuity of these services is mainly carried out by the maintenance which is no longer an aftermarket service needed for product (system) functionality but rather an inherent service function of the product (system). Thus this paper aims to investigate the role of maintenance to contribute to the development of these paradigms. It is based first on describing the main features of industrial ecology/circular economy transposing the nature concepts to industrial system. It leads to define key principles and levers to be addressed for the development of industrial ecosystems. Then maintenance activity is globally presented allowing, in a second step, to place maintenance services already existing in line with some of these principles and levers (ex. green maintenance), but also to explore advanced maintenance services more able to support promotion of industrial ecosystem by covering others principles and levers. These advanced services can be built from conventional maintenance processes but integrating sustainability goal (ex. prognostics of energy efficiency) or from innovative processes (ex. regenerative management). Finally scientific issues related to these advanced maintenance services are underlining and should concretize future research directions for researchers/practitioners working on maintenance field.

Benoit Iung; Eric Levrat

2014-01-01T23:59:59.000Z

304

Limited Commercial Maintenance (LCLM) Limited Lawn & Ornamental (LLO)  

E-Print Network [OSTI]

, Limited Commercial Landscape Maintenance, Ornamental & Turf, Private Ag, or General Standards CORE for Limited Commercial Landscape Maintenance (LCLM), you must attend all day to earn the 6 CEUs required. Limited Commercial Maintenance (LCLM) Limited Lawn & Ornamental (LLO) Training & Exams Date

Florida, University of

305

Active solar-energy-system design, installation, and maintenance manual. Final report, April 1984-March 1986  

SciTech Connect (OSTI)

This manual provides project managers, engineers, and operations and maintenance personnel with information on designing, installing, and maintaining active solar energy systems for a variety of applications at Air Force facilities. These systems include domestic hot water, industrial process heat, space heating, space cooling, and swimming-pool heating systems.

Diamond, S.C.; Avery, J.G.; Wood, C.

1986-04-01T23:59:59.000Z

306

Drop In Fuels: Where the Road Leads  

Broader source: Energy.gov [DOE]

Reviews key fuel industry drivers, renewable fuel mandates and projected impact on hydrocarbon fuels

307

Long Length Contaminated Equipment Maintenance Plan  

SciTech Connect (OSTI)

The purpose of this document is to provide the maintenance requirements of the Long Length Contaminated Equipment (LLCE) trailers and provide a basis for the maintenance frequencies selected. This document is applicable to the LLCE Receiver trailer and Transport trailer assembled by Mobilized Systems Inc. (MSI). Equipment used in conjunction with, or in support of, these trailers is not included. This document does not provide the maintenance requirements for checkout and startup of the equipment following the extended lay-up status which began in the mid 1990s. These requirements will be specified in other documentation.

ESVELT, C.A.

2000-02-01T23:59:59.000Z

308

Maintenance Management Program for DOE Nuclear Facilities  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To define the program for the management of cost-effective maintenance of Department of Energy (DOE) nuclear facilities. Guidance for compliance with this Order is contained in DOE G 433.1-1, Nuclear Facility Maintenance Management Program Guide for use with DOE O 433.1, which references Federal regulations, DOE directives, and industry best practices using a graded approach to clarify requirements and guidance for maintaining DOE-owned Government property. (Cancels DOE 4330.4B, Chapter II, Maintenance Management Program, dated 2-10-94.) Cancels DOE 4330.4B (in part). Canceled by DOE O 433.1A.

2001-06-01T23:59:59.000Z

309

Africa's Transport Infrastructure Mainstreaming Maintenance and  

Open Energy Info (EERE)

Africa's Transport Infrastructure Mainstreaming Maintenance and Africa's Transport Infrastructure Mainstreaming Maintenance and Management Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Africa's Transport Infrastructure Mainstreaming Maintenance and Management Agency/Company /Organization: World Bank Complexity/Ease of Use: Not Available Website: www.infrastructureafrica.org/system/files/Africa%27s%20Transport%20Inf Transport Toolkit Region(s): Africa & Middle East Related Tools The BEST Experiences with Bioethanol Buses The Sourcebook on Sustainable Urban Transport Alternative Fuels and Advanced Vehicles Data Center ... further results Find Another Tool FIND TRANSPORTATION TOOLS Transport infrastructure is a key requirement for economic growth. In Africa today, networks are sparse, conditions poor, transit slow and

310

Project Overview  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Questions Keeler-Pennwalt Wood Pole Removal Line Projects Line Rebuild, Relocation and Substation Projects Spacer Damper Replacement Program Wind Projects Project Overview BPA...

311

Project Year Project Title  

E-Print Network [OSTI]

operators, matrix indexing, vector computations, loops, functions, and plotting graphs, among others basic arithmetic operators, matrix indexing, and vector computations in MATLAB. After creatingProject Year 2011-2012 Project Title Online Tutorial for MATLAB Project Team Eileen Haase, Whiting

Gray, Jeffrey J.

312

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2005 Project Team Krysia Hudson, Faculty, School of Nursing, Undergraduate Instruction for Educational Resources Project Title Enhanced Web-based Learning Environments for Beginning Nursing Students (e.g., demonstrations of procedures or tasks) into the WBL systems, it will be possible to increase

Gray, Jeffrey J.

313

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Michael McCloskey, Cognitive Science/Neuroscience, Krieger of Arts & Sciences Project Title Cognitive Neuropsychology Audience The initial audience to access. The current procedure calls for individual students or researchers to contact the faculty member

Gray, Jeffrey J.

314

Project Year Project Title  

E-Print Network [OSTI]

Project Year 2011-2012 Project Title Using M-Health and GIS Technology in the Field to Improve into teams and having each team use a different m-health data collection tool (e.g., cellular phones, smart health patterns. The Tech Fellow, Jacqueline Ferguson, will assist in creating an m-health project

Gray, Jeffrey J.

315

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Gregory Hager, Computer Science, Whiting School of Engineering Fellow: Alan Chen, Biomedical Engineering, Whiting School of Engineering Project Title Robotics is complicated, time-consuming, and costly, making a robot for an introductory-level class is not practical

Gray, Jeffrey J.

316

Project Proposal Project Logistics  

E-Print Network [OSTI]

Project Proposal · Project Logistics: ­ 2-3 person teams ­ Significant implementation, worth 55 and anticipated cost of copying to/from host memory. IV. Intellectual Challenges - Generally, what makes this computation worthy of a project? - Point to any difficulties you anticipate at present in achieving high

Hall, Mary W.

317

Project Title: DOE Code: Project Lead: NEPA COMPLIANCE SURVEY  

Broader source: Energy.gov (indexed) [DOE]

DOE Code: DOE Code: Project Lead: NEPA COMPLIANCE SURVEY # 258 Project lnfonnation Rewire electrical to pole at 77SHX10 Mike Preston Date: 11-19-09 Contractor Code: Project Overview No~ rea has been previously disturbed. The trenching will be th,ugh pre-existing right of way for the 1. What are the environmental ~ ~=~d ~ impacts? 2. What is the legal location? Repair a~ replacement of electrical lines to the Pole next to well at 77S~1 0. This will require trenching 3. What is the duration of the project? across the road a~ to the pole. Removing old lines and replacement of lines. 4. What major equipment will be used if any (wor1< over rig, drilling rig, 1 day etc.)? Back hole The table below is to be completed by the Project Lead and reviewed by the Environmental Specialist and the DOE NEPA

318

EDGEWOOD COUNTRY CLUB 100 CHURCHILL ROAD  

E-Print Network [OSTI]

. Position Available: 3rd Assistant Superintendent - $14.00 - $15.00 per hour II. Professional a unified design. Organize maintenance buildings and equipment storage ­ improve organization and Pesticide Management: Obtain and maintain a PA pesticide license through testing and yearly training

319

Lawn Maintenance/Landscape Positions (Macomb/Oakland) DeClark's Landscaping Inc., a growing company and leader in the Green Industry for 30 yrs, is seeking  

E-Print Network [OSTI]

Lawn Maintenance/Landscape Positions (Macomb/Oakland) DeClark's Landscaping Inc., a growing company clients. These are full time positions with competitive wages. -Grounds Maintenance Sales/Supervisor -Landscape Project Manager -Certified Arborist -Lawn Technician (Certified 3A) -Landscape Foreman -Landscape

320

Project X  

E-Print Network [OSTI]

administrative procedures. Efficiency of maintenance,a partial optimization procedure. The flux of cold neutronsrecorded in the simulation procedure. Each traced neutron

Holmes, Steve

2014-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Federal Energy Management Program: Operations and Maintenance Program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Operations and Operations and Maintenance Program Structure to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Program Structure on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Program Structure on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Program Structure on Google Bookmark Federal Energy Management Program: Operations and Maintenance Program Structure on Delicious Rank Federal Energy Management Program: Operations and Maintenance Program Structure on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Program Structure on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements

322

Federal Energy Management Program: Operations and Maintenance Program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Operations and Operations and Maintenance Program Implementation to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Program Implementation on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Program Implementation on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Program Implementation on Google Bookmark Federal Energy Management Program: Operations and Maintenance Program Implementation on Delicious Rank Federal Energy Management Program: Operations and Maintenance Program Implementation on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Program Implementation on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance

323

Federal Energy Management Program: Resources on Operations and Maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Resources on Resources on Operations and Maintenance to someone by E-mail Share Federal Energy Management Program: Resources on Operations and Maintenance on Facebook Tweet about Federal Energy Management Program: Resources on Operations and Maintenance on Twitter Bookmark Federal Energy Management Program: Resources on Operations and Maintenance on Google Bookmark Federal Energy Management Program: Resources on Operations and Maintenance on Delicious Rank Federal Energy Management Program: Resources on Operations and Maintenance on Digg Find More places to share Federal Energy Management Program: Resources on Operations and Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning

324

CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope...  

Broader source: Energy.gov (indexed) [DOE]

Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor February 2007 A section of...

325

CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope...  

Broader source: Energy.gov (indexed) [DOE]

Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR...

326

FY 2014 Real Property Data Related to Operations and Maintenance...  

Office of Environmental Management (EM)

FY 2014 Real Property Data Related to Operations and Maintenance Guidance FY 2014 Real Property Data Related to Operations and Maintenance Guidance FY2014DataRelatedtoOperatio...

327

DOE Announces Webinars on Maintenance Practices for LED Streetlights...  

Broader source: Energy.gov (indexed) [DOE]

Maintenance Practices for LED Streetlights, LED Color Stability, and More DOE Announces Webinars on Maintenance Practices for LED Streetlights, LED Color Stability, and More April...

328

Joint Maintenance Status Report of Potomac Electric Power Company...  

Broader source: Energy.gov (indexed) [DOE]

Joint Maintenance Status Report of Potomac Electric Power Company amd PJM Interconnection, LLC Joint Maintenance Status Report of Potomac Electric Power Company amd PJM...

329

Operations and Maintenance for Major Equipment Types | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Types Operations and Maintenance for Major Equipment Types Equipment lies at the heart of all operations and maintenance (O&M) activities. This equipment varies greatly...

330

ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS...  

Broader source: Energy.gov (indexed) [DOE]

1: SPACE AND MAINTENANCE RECORDS ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS This schedule provides for the disposal of all copies, wherever located in the...

331

Improve Operations & Maintenance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Improve Operations & Maintenance Improve Operations & Maintenance Improve Operations & Maintenance Photo of an equipment room in a high-rise commercial office building with red and green equipment. Every building's energy consumption can benefit from rigorous operations and maintenance (O&M) practices. Properly planned and executed O&M is one of the most cost-effective strategies for ensuring equipment longevity, reliability, safety, and energy efficiency in commercial buildings. By one estimate, O&M measures cost about 20 times less and achieve roughly the same energy savings as energy efficiency upgrades. There are various opportunities to improve efficiency through O&M that can be discovered through efforts such as engaging tenants, training building staff, and

332

Modelling in industrial maintenance and reliability  

Science Journals Connector (OSTI)

......of modelling the reliability of wind turbines and some critical subsystems from...change, through the years, in wind turbines reliability. There were major...research on determining optimal maintenance policies for deteriorating systems......

Wenbin Wang

2010-10-01T23:59:59.000Z

333

Operations and Maintenance Best Practices Guide  

Broader source: Energy.gov [DOE]

The Federal Energy Management Program's Operations and Maintenance (O&M) Best Practices Guide outlines best practices to help Federal agencies implement effective O&M for systems and...

334

Operations and Maintenance for Major Equipment Types  

Broader source: Energy.gov [DOE]

Equipment lies at the heart of all operations and maintenance (O&M) activities. This equipment varies greatly across the Federal sector in age, size, type, model, condition, etc.

335

SITE MAINTENANCE PLAN CSMRI SITE REMEDIATION  

E-Print Network [OSTI]

...............................................................................................................5 5.2 Ground and Surface Water MonitoringSITE MAINTENANCE PLAN CSMRI SITE REMEDIATION June 29, 2004 Prepared by: Colorado School of Mines .................................................................................................4 5.0 SITE AIR AND WATER MONITORING

336

Operation & Maintenance for Quality Indoor Air  

E-Print Network [OSTI]

The results of numerous Indoor Air Quality (IAQ) building investigations conducted by the Georgia Tech Research Institute have shown that building Operation and Maintenance (O&M) is a very common source of IAQ problems. This paper presents...

Downing, C.; Bayer, C. W.

1990-01-01T23:59:59.000Z

337

Western Greenbrier Co-Production Demonstration Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

contacts contacts Brad tomer Director Office of Major Demonstrations National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507-0880 304-285-4692 brad.tomer@netl.doe.gov nelson Rekos Project Manager National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507-0880 304-285-4066 nelson.rekos@netl.doe.gov PaRtIcIPant Western Greenbrier Co-Generation, LLC Lewisburg, WV Western Greenbrier Co-ProduCtion demonstration ProjeCt (disContinued) Project Description The Western Greenbrier Co-Production (WGC) project will generate about 100 megawatts of electricity and commercial quantities of salable ash by-products by burning waste coal presently contained in numerous coal refuse dumps in the vicinity of the plant. These refuse dumps, created by coal cleaning operations over

338

Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Vehicle Maintenance to Vehicle Maintenance to Conserve Fuel to someone by E-mail Share Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Facebook Tweet about Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Twitter Bookmark Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Google Bookmark Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Delicious Rank Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Digg Find More places to share Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on AddThis.com... More in this section... Idle Reduction Parts & Equipment Maintenance Driving Behavior Fleet Rightsizing System Efficiency Vehicle Maintenance to Conserve Fuel A comprehensive vehicle maintenance strategy can help fleet managers and

339

Montana - Access Road Easement Policy | Open Energy Information  

Open Energy Info (EERE)

General: Montana - Access Road Easement Policy Author Montana Department of Transportation Published Montana Department of Transportation, 2006 DOI Not Provided Check for...

340

Road Blocks Yield Key Information about a Catalyst | The Ames...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Road Blocks Yield Key Information about a Catalyst Researchers systematically blocked key chemical reaction pathways to get unambiguous information about how carbon-nitrogen bonds...

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Substations reliability-centered maintenance and predictive maintenance - a strategic partnership  

SciTech Connect (OSTI)

A maintenance optimization study for substation components can be most effective when Reliability Centered Maintenance (RCM) Analysis is combined with a Predictive Maintenance (PDM) Assessment. If the two processes are performed concurrently, the benefit-to-cost ratios for each is increased. Also, the cost of implementing RCM recommendations for condition monitoring can be minimized, while maximizing their impact at the same time. This paper presents the essential elements of both the RCM and PDM processes, and describes how they work together in a substation environment as a comprehensive maintenance assessment tool. Descriptions of recent experiences are also included.

Colsher, R.J. [Electric Power Research Institute, Eddystone, PA (United States); Abbott, P.D.; Matusheski, R.L. [EPRI & MD Center, Eddystone, PA (United States); Smith, S.B. [ERIN Engineering & Research, Walnut Creek, CA (United States)

1996-08-01T23:59:59.000Z

342

Degradation in urban air quality from construction activity and increased traffic arising from a road widening scheme  

Science Journals Connector (OSTI)

Abstract Road widening schemes in urban areas are often proposed as a solution to traffic congestion and as a means of stimulating economic growth. There is however clear evidence that new or expanded roads rapidly fill with either displaced or induced traffic, offsetting any short-term gains in eased traffic flows. What has not been addressed in any great detail is the impact of such schemes on air quality, with modelled impact predictions seldom validated by measurements after the expansion of road capacity. In this study we made use of a road widening project in London to investigate the impact on ambient air quality (particulate matter, NOX, NO2) during and after the completion of the road works. PM10 increased during the construction period up to 15?gm?3 during working hours compared to concentrations before the road works. A box modelling approach was used to determine a median emission factor of 0.0022kgPM10m?2month?1, three times larger than that used in the UK emission inventory (0.0007kgPM10m?2month?1). Peaks of activity released 0.0130kgPM10m?2month?1, three and eight times smaller than the peak values used in the European and US inventories. After the completion of the widening there was an increase in all pollutants from the road during rush hour: 24?gm?3 for PM10; 1?gm?3 for PM2.5; 40 and 8?gm?3 for NOX and NO2, respectively. NO2 EU Limit Value was breached after the road development illustrating a notable deterioration in residential air quality. Additionally, PM10, but not PM2.5, glutathione dependent oxidative potential increased after the road was widened consistent with an increase in pro-oxidant components in the coarse particle mode, related to vehicle abrasion processes. These increased air pollution indices were associated with an increase in the number of cars, taxis and LGVs.

Anna Font; Timothy Baker; Ian S. Mudway; Esme Purdie; Christina Dunster; Gary W. Fuller

2014-01-01T23:59:59.000Z

343

Early Cook County Roads -- Part One  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

One One Nature Bulletin No. 738 January 11, 1964 Forest Preserve District of Cook County Seymour Simon, President Roberts Mann, Conservation Editor EARLY COOK COUNTY ROADS -- PARK ONE When Chicago was incorporated as a village in 1833 it was only a squalid hamlet of about 350 inhabitants and appeared to be so poorly situated that it was hopeless -- "crude cabins and flimsy shacks in a chaos of mud, rubbish and confusion. " Only a few feet above the level of Lake Michigan, the place was almost entirely surrounded by swamps and miles and miles of prairies that became nearly impassable after spring thaws and during periods of heavy rainfall. There were only two important routes that afforded access at all times. One was the Green Bay Trail, ancestor of North Clark St. in Chicago, Ridge Ave. in Evanston, and Green Bay Road north of that. The other, traveled by the soldiers coming from Detroit to build Fort Dearborn in 1803, used the Great Sauk Trail to La Porte, Indiana, then a trail northwesterly to what is now Michigan City, and the firm sands of the lake beach the rest of the way.

344

Neural-Network-Based Maintenance Decision Model for Diesel Engine  

Science Journals Connector (OSTI)

To decrease the fuzzy and uncertain factors in the maintenance decision models of diesel engine, a combination BP-neural-network-based maintenance decision model for diesel engine is presented in this paper. It can make the maintenance of diesel engine ... Keywords: Deterioration degree, Diesel engine, Maintenance decision, Neural network

Yingkui Gu; Juanjuan Liu; Shuyun Tang

2008-09-01T23:59:59.000Z

345

NEPA COMPLIANCE SURVEY Project Information Project Title: Casing Drilling Test  

Broader source: Energy.gov (indexed) [DOE]

Casing Drilling Test Casing Drilling Test Date: 5-17-201 1 DOE Code: 6730-020-72000 Contractor Code: 8067-806 Project Lead: Marl< Duletsky Project Overview 1, Brief project description ~nclude The existing 13-1-SX-23 location and entry road will be reworlproject 4. Major equipment to be used

346

Federal Energy Management Program: Operations and Maintenance Program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Measurement to someone by E-mail Measurement to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Program Measurement on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Program Measurement on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Program Measurement on Google Bookmark Federal Energy Management Program: Operations and Maintenance Program Measurement on Delicious Rank Federal Energy Management Program: Operations and Maintenance Program Measurement on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Program Measurement on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management

347

Federal Energy Management Program: Operations and Maintenance Management  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Management Support to someone by E-mail Management Support to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Management Support on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Management Support on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Management Support on Google Bookmark Federal Energy Management Program: Operations and Maintenance Management Support on Delicious Rank Federal Energy Management Program: Operations and Maintenance Management Support on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Management Support on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management

348

Microsoft Word - CX-AlveyMaintenanceHQ_PoleStorageUpgrade_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

4 4 SUBJECT: Environmental Clearance Memorandum Brett Sherer Project Manager - KEP-4 Proposed Action: Environmental protection system upgrades at pole storage facility at Alvey Maintenance Headquarters. Budget Information: Work Order #00283226 Categorical Exclusion Applied (Appendix B to Subpart D, 10 C.F.R. Part 1021): B4.6: Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area including, but not limited to, switchyard rock grounding upgrades, secondary containment projects, paving projects, seismic upgrading, tower modifications, changing insulators, and replacement of poles, circuit breakers, conductors, transformers, and crossarms.

349

Six?year study of IMSA road racing noise  

Science Journals Connector (OSTI)

The Del Mar Fairgrounds San Diego hosted the IMSA Grand Prix for 6 years from 19871993. The project provides a unique long?term study of professional road racing noise in a unique setting a narrow valley just east of the coastline and within an environmentally sensitive lagoon. Sponsors were required to perform community noise monitoring at selected locations in the adjacent hills and lagoon. Both human and bird responses were examined. The monitoring documented the hour by hour variations in the maximum and average noise levels at up to 12 separate locations. The results indicated the thresholds which would trigger community response the sensitivity of the response to diurnal and short?term wind shift the effect of the inversion layer the effects on bird patterns and the statistical distribution of vehicle noise levels for the IMSA class vehicle. Basic findings revealed community response was triggered when levels exceeded 70 dBA Lavg. Downwind levels tended to increase at 1 dBA/mph over 5 mph. When the track was within an inversion levels increased 10 dBA. The mean vehicle level at 15 m was 105 dBA with a 4?dBA standard deviation.

Gordon Bricken; Christopher Jean

1997-01-01T23:59:59.000Z

350

13th Annual Transportation Engineering and Road Research Alliance (TERRA)  

E-Print Network [OSTI]

13th Annual Sponsor: Transportation Engineering and Road Research Alliance (TERRA) Cosponsors: Minnesota Department of Transportation (Mn/DOT) Minnesota Local Technical Assistance Program (LTAP Association State Aid for Local Transportation, Mn/DOT Minnesota Local Road Research Board (LRRB) Pavement

Minnesota, University of

351

Active traffic management on road networks: a macroscopic approach  

Science Journals Connector (OSTI)

...Active traffic management on road networks: a macroscopic approach Alex A. Kurzhanskiy...and Computer Sciences, University...Active traffic management (ATM) is the...by National Science Foundation Award...Active traffic management on road networks: a macroscopic approach. | Active traffic...

2010-01-01T23:59:59.000Z

352

Lane departure detection for improved road geometry estimation  

E-Print Network [OSTI]

vehicles is mea- sured using a vision system and a radar, whereas the shape of the road is measured using1 Lane departure detection for improved road geometry estimation Thomas B. Sch¨on Andreas Eidehall Fredrik Gustafsson Division of Automatic Control Vehicle Dynamics and Active Safety Link¨oping University

Schön, Thomas

353

Astronomical Data Processing in EXTASCID 5200 N Lake Road  

E-Print Network [OSTI]

Astronomical Data Processing in EXTASCID Yu Cheng UC Merced 5200 N Lake Road Merced, CA 95343 ycheng4@ucmerced.edu Florin Rusu UC Merced 5200 N Lake Road Merced, CA 95343 frusu@ucmerced.edu ABSTRACT processing systems are designed for a single data model and handle complex processing at the application

Rusu, Florin

354

Climate policies for road transport revisited (I): Evaluation of the  

Open Energy Info (EERE)

Climate policies for road transport revisited (I): Evaluation of the Climate policies for road transport revisited (I): Evaluation of the current framework Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Climate policies for road transport revisited (I): Evaluation of the current framework Agency/Company /Organization: Elsevier Complexity/Ease of Use: Not Available Website: www.pik-potsdam.de/members/edenh/publications-1/CPFRTRI.pdf Related Tools Alternative Fuels and Advanced Vehicles Data Center - Codes and Standards Resources Reducing Congestion through Smart Parking Management Performance Measurement in the Road Sector: A Cross-Country Review of Experience ... further results Find Another Tool FIND TRANSPORTATION TOOLS This paper evaluates the effectiveness and efficiency of current climate policies for road transport that (1) target fuel producers and/or car

355

Carbon Capture and Storage Road Map | Open Energy Information  

Open Energy Info (EERE)

and Storage Road Map and Storage Road Map Jump to: navigation, search Name Carbon Capture and Storage Road Map Agency/Company /Organization Asian Development Bank Sector Energy Focus Area Renewable Energy, Economic Development, Greenhouse Gas, Industry Topics Adaptation, Implementation, Low emission development planning, -LEDS Website http://www.adb.org/news/adb-he Country China Eastern Asia References ADB Helps People's Republic of China Plan Carbon Capture and Storage Road Map[1] Program Overview "The Asian Development Bank (ADB) is assisting the People's Republic of China (PRC) in the development of a road map for carbon capture and storage (CCS) to help achieve the country's carbon dioxide (CO2) emissions reduction goals. ADB will assist the PRC in developing a detailed plan for a staged

356

Microsoft Word - CX-BigEddy-Redmond-ConductorMaintenance-FY13_WEB  

Broader source: Energy.gov (indexed) [DOE]

4, 2013 4, 2013 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Stacy Hensley Project Manager - TEP-CSB-2 Proposed Action: Conductor maintenance on Bonneville Power Administration's (BPA) Big Eddy-Redmond transmission line Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities Location: Approximately six miles southeast of The Dalles in Wasco County, Oregon. T1N, R14E, Sec 4, 5, 9, 20, 28, 29, and 33 Proposed by: BPA Description of the Proposed Action: BPA proposes to perform routine maintenance on the Big Eddy-Redmond, 230-kilovolt transmission line conductor. The proposed work includes re-sagging the transmission line, and replacing the transmission line hardware and transmission

357

Y-12 Groundwater Protection Program Monitoring Well Inspection and Maintenance Plan  

SciTech Connect (OSTI)

This document is the third revision of the 'Monitoring Well Inspection and Maintenance Plan' for groundwater wells associated with the US Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. This plan describes the systematic approach for: (1) inspecting the physical condition of monitoring wells at Y-12; (2) identifying maintenance needs that extend the life of the well and assure well-head protection is in place, and (3) identifying wells that no longer meet acceptable monitoring-well design or well construction standards and require plugging and abandonment. The inspection and maintenance of groundwater monitoring wells is one of the primary management strategies of the Y-12 Groundwater Protection Program (GWPP) Management Plan, 'proactive stewardship of the extensive monitoring well network at Y-12' (BWXT 2004a). Effective stewardship, and a program of routine inspections of the physical condition of each monitoring well, ensures that representative water-quality monitoring and hydrologic data are able to be obtained from the well network. In accordance with the Y-12 GWPP Monitoring Optimization Plan (MOP) for Groundwater Monitoring Wells at the Y-12 National Security Complex, Oak Ridge, Tennessee (BWXT 2006b), the status designation (active or inactive) for each well determines the scope and extent of well inspections and maintenance activities. This plan, in conjunction with the above document, formalizes the GWPP approach to focus available resources on monitoring wells which provide the most useful data. This plan applies to groundwater monitoring wells associated with Y-12 and related waste management facilities located within the three hydrogeologic regimes: (1) the Bear Creek Hydrogeologic Regime (Bear Creek Regime); (2) the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime); and (3) the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek Regime encompasses a section of the Bear Creek Valley (BCV) immediately west of Y-12. The East Fork Regime encompasses most of the Y-12 process, operations, and support facilities in BCV east of scarboro Road. The Chestnut Ridge Regime is directly south of Y-12 and encompasses a section of Chestnut Ridge that is bound to the west by a surface drainage feature (Dunaway Branch) and by Scarboro Road to the east. The GWPP maintains an extensive database of construction details and related information for the monitoring wells in each hydrogeologic regime in the 'Updated Subsurface Database for Bear Creek Valley, Chestnut Ridge, and parts of Bethel Valley on the US DOE Oak Ridge Reservation (BWXT 2003a). A detailed description of the hydrogeologic framework at Y-12 can be found in the GWPP Management Plan (BWXT 2004a).

None

2006-12-01T23:59:59.000Z

358

POST-DEACTIVATION SURVEILLANCE AND MAINTENANCE PLANNING  

Broader source: Energy.gov (indexed) [DOE]

POST-DEACTIVATION SURVEILLANCE AND POST-DEACTIVATION SURVEILLANCE AND MAINTENANCE PLANNING Post-Deactivation Surveillance and Maintenance Planning Dependence of End-Points Planning on S&M Planning Primary Surveillance Concerns Typical Deactivation S&M Plan Contents Example of a Post-Deactivation S&M Plan Dependence of End-Points Planning on S&M Planning One of the key elements of end-point planning is knowing what the post-deactivation S&M activities will be so that conditions can be established to support them. The post-deactivation S&M plan specifies the surveillance, inspection, and maintenance of the facility in the deactivated state. It should address the activities, the locations in which they will be conducted, and their frequency. Part of the S&M planning is

359

34 - Pipeline Commissioning, Operations, and Maintenance  

Science Journals Connector (OSTI)

Abstract The commissioning of a pipeline involves the activities after installation required to place the system into services, which activities include hydrostatic testing, cleaning and drying, and the introduction of the product to be transported into the pipeline. Pipeline operations are generally carried out by the pipeline operating company. Detailed operation and maintenance procedures specific to the pipeline should be available for use before the pipeline is commissioned and handed over to operation. Manuals for operation and maintenance should be prepared, setting out the schedules, procedures, and instructions on which activities are to be carried out, including liaison with third parties. In this chapter, the procedures of commissioning, operation, and maintenance of subsea pipeline are detailed.

Qiang Bai; Yong Bai

2014-01-01T23:59:59.000Z

360

Apply reliability centered maintenance to sealless pumps  

SciTech Connect (OSTI)

This paper reports on reliability centered maintenance (RCM) which is considered a crucial part of future reliability engineering. RCM determines the maintenance requirements of plants and equipment in their operating context. The RCM method has been applied to the management of critical sealless pumps in fire/toxic risk services, typical of the petrochemical industry. The method provides advantages from a detailed study of any critical engineering system. RCM is a team exercise and fosters team spirit in the plant environment. The maintenance strategy that evolves is based on team decisions and relies on maximizing the inherent reliability built into the equipment. RCM recommends design upgrades where this inherent reliability is being questioned. Sealless pumps of canned motor design are used as main reactor charge pumps in PVC plants. These pumps handle fresh vinyl chloride monomer (VCM), which is both carcinogenic and flammable.

Pradhan, S. (Exxon Chemicals Canada, Ontario (Canada))

1993-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

BuildingName The Description of the Project  

E-Print Network [OSTI]

SECTION 012900 ­ PAYMENT PROCEDURES SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION SECTION 013200 PROCEDURES SECTION 017823 ­ OPERATION AND MAINTENANCE MANUALS SECTION 019100 ­ FULL PROJECT COMMISSIONINGBuildingName The Description of the Project P00000000 0000 DOCUMENTS SPECIFICATION DIVISION 1

Kamat, Vineet R.

362

Greenidge Multi-Pollutant Control Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Plant Improvement Power Plant Improvement Initiative (PPII) CONTACTS Brad Tomer Director Offi ce of Major Demonstrations National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507-0880 304-285-4692 brad.tomer@netl.doe.gov Wolfe Huber National Energy Technology Laboratory 626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236-0940 412-386-5747 wolfe.huber@netl.doe.gov PARTNER CONSOL Energy Inc. Pittsburgh, PA ADDITIONAL TEAM MEMBERS AES Greenidge, LLC Babcock Power Environmental, Inc. GREENIDGE MULTI-POLLUTANT CONTROL PROJECT Project Description This project demonstrated a selective non-catalytic reduction (SNCR)/in-duct selective catalytic reduction (SCR) hybrid in combination with low-NO X burners (LNBs) and a circulating fl uidized bed dry scrubber (CFBDS) system using recycled

363

E-Print Network 3.0 - access roads rehabilitation Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Station - Flagstaff Lab Collection: Environmental Sciences and Ecology 15 University of Kings Edwards Summary: . Bournbrook Road The road will be closed to vehicular traffic...

364

Cleaning Up Non-Road Diesel Vehicles: A Public Health Imperative...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Non-Road Diesel Vehicles: A Public Health Imperative Cleaning Up Non-Road Diesel Vehicles: A Public Health Imperative 2002 DEER Conference Presentation: Union of Concerned...

365

E-Print Network 3.0 - automatic road extraction Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

with no tuning, as well as extracting the road midline using residual... and watershed image processing techniques to extract a road network in the vicinity of the vehicle,...

366

The Private Provision of Frontier Infrastructure: Toll Roads in California, 1850-1902  

E-Print Network [OSTI]

and Gold Run (1867), Weaverville and Minersville (1863), andwho controlled the Weaverville & Shasta Wagon Road and thea large interest in the Weaverville & Minersville Toll Road.

Klein, Daniel B.; Yin, Chi

1994-01-01T23:59:59.000Z

367

Maintenance strategies to improve sootblower availability  

SciTech Connect (OSTI)

Sootblowers are electromechanical devices used for removal of ash and slag deposits from boiler tube surfaces. By directing steam, air, or water cleaning medium through a nozzle to remove deposits from boiler tubes, boilers are kept on-line for longer periods of time reducing the need for outages to clean the boiler by mechanical means. Fuel must be burned efficiently to minimize stagging and fouling of the heat transfer surfaces. Tuning the boiler to maximize combustion efficiency should not be limited to optimizing fuel conditions, air-fuel ratios, firing rates, excess air, and over-fire air, but should also include the use of sootblowers. The goal is to know when to clean, and if the cleaning cycle has effectively removed the deposit and increased heat transfer. Today, boiler cleaning technology not only focuses on the impact of the sootblowing system on overall boiler performance, but it also focuses on design improvements that impact an individual sootblower`s performance. Proper sootblower maintenance is an integral part of making existing designs and new designs work. Existing computer technologies provide a viable means of documenting and trending sootblower performance data and maintenance history. The personal computer and the availability of spreadsheet and database software make the task of quantifying sootblower performance data and maintenance history easier to achieve. The difficult task is gathering the proper data to make decisions about sootblowing operations and maintenance. The balance of this paper will discuss typical maintenance practices, and improvements that can be achieved by documenting sootblowing system inspections and maintenance activity using a personal computer database.

Walther, J.M.; Whitehead, B.K.

1996-07-01T23:59:59.000Z

368

Pilot Project for Fixed Segmentation of the Pavement Network  

E-Print Network [OSTI]

Road DIXON AVENUE/GRANT ROAD Midway Meridian Leisure TownRoad DIXON AVENUE/GRANT ROAD Midway Meridian Leisure TownRoad DIXON AVENUE/GRANT ROAD Midway Meridian Leisure Town

Kohler, Erwin R.; Santero, Nicholas J.; Harvey, John T

2005-01-01T23:59:59.000Z

369

Steam Trap Maintenance as a Profit Center  

E-Print Network [OSTI]

the Eighteenth Industrial Energy Technology Conference, Houston, TX, April 17-18, 1996 EXCUSES Everybody thinks his or her steam trap maintenance is good. Surveysl have shown the following are the most popular excuses encountered when managers are confronted... for steam traps. 192 ESL-IE-96-04-28 Proceedings from the Eighteenth Industrial Energy Technology Conference, Houston, TX, April 17-18, 1996 5. Set up a trap maintenance program C. Prepare and present a report to that will: management on the results...

Bouchillon, J. L.

370

Project Year Project Team  

E-Print Network [OSTI]

; Ian Sims, Student, Electrical and Computer Engineering, Whiting School of Engineering Project Title and Jazz Theory/Keyboard I & II. Technologies Used Digital Audio, Digital Video, Graphic Design, HTML

Gray, Jeffrey J.

371

Notices Bldg., 901 Pilottown Road, Lewes, DE  

Broader source: Energy.gov (indexed) [DOE]

4 Federal Register 4 Federal Register / Vol. 77, No. 249 / Friday, December 28, 2012 / Notices Bldg., 901 Pilottown Road, Lewes, DE 19958. January 17, 2013: 7-9 p.m.; Ocean County Administration Building, 101 Hooper Avenue, Public Hearing Room #119, Toms River, NJ 08754. Special Accommodations The hearings are physically accessible to people with disabilities. Requests for sign language interpretation or other auxiliary aids should be directed to M. Jan Saunders at the Mid-Atlantic Council Office, (302) 526-5251, at least 5 days prior to the hearing date. Dated: December 21, 2012. Tracey L. Thompson, Acting Deputy Director, Office of Sustainable Fisheries, National Marine Fisheries Service. [FR Doc. 2012-31148 Filed 12-27-12; 8:45 am] BILLING CODE 3510-22-P COMMODITY FUTURES TRADING

372

Savannah River Site 1991 Road Erosion Inventory.  

SciTech Connect (OSTI)

Final Report. USDA Forest Service, Savannah River, Aiken, SC. 28 pp. Abstract - This paper explains the rationale and results of a 1991 road erosion inventory conducted by members of the USDA Forest Service Savannah River (FS-SR) and USDA Natural Resources Conservation Service (NRCS). The inventory provided information for the Department of Energy - Savannah River (DOE-SR) to justify the need for developing an erosion and sediment control program with appropriate funding, personnel, and equipment. Federally managed since the early 1950s, the SRS is located on 198,344 acres (80,301 hectares) in the South Carolina counties of Aiken, Barnwell, and Allendale. Located along the eastern border of the Savannah River, the SRS is located within the Upper and Lower Coastal Plains of South Carolina.

Jones, Cliff.

2007-06-22T23:59:59.000Z

373

Operations & Maintenance Best Practices Guide: Release 3.0  

Broader source: Energy.gov (indexed) [DOE]

O&M Best Practices Guide, Release 3.0 3.1 O&M Best Practices Guide, Release 3.0 3.1 Chapter 3 O&M Management 3.1 Introduction O&M management is a critical component of the overall program. The management function should bind the distinct parts of the program into a cohesive entity. From our experience, the overall program should contain five very distinct functions making up the organization: Operations, Maintenance, Engineering, Training, and Administration-OMETA. Beyond establishing and facilitating the OMETA links, O&M managers have the responsibility of interfacing with other department managers and making their case for ever-shrinking budgets. Their roles also include project implementation functions as well as the need to maintain persistence of the

374

Operations & Maintenance Best Practices Guide: Release 3.0  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

O&M Best Practices Guide, Release 3.0 3.1 O&M Best Practices Guide, Release 3.0 3.1 Chapter 3 O&M Management 3.1 Introduction O&M management is a critical component of the overall program. The management function should bind the distinct parts of the program into a cohesive entity. From our experience, the overall program should contain five very distinct functions making up the organization: Operations, Maintenance, Engineering, Training, and Administration-OMETA. Beyond establishing and facilitating the OMETA links, O&M managers have the responsibility of interfacing with other department managers and making their case for ever-shrinking budgets. Their roles also include project implementation functions as well as the need to maintain persistence of the

375

Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Maintenance and Safety to someone by E-mail Maintenance and Safety to someone by E-mail Share Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on Facebook Tweet about Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on Twitter Bookmark Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on Google Bookmark Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on Delicious Rank Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on Digg Find More places to share Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on AddThis.com... More in this section... Natural Gas Basics Benefits & Considerations Stations Vehicles Availability Conversions Emissions Maintenance & Safety

376

Microsoft Word - CX-HeboSubstationA- FY13_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

Todd Nicholson Supervisory Civil Engineer - TELF-TPP-3 Proposed Action: Hebo Substation Access Road Maintenance Budget Information: Work Order 00270316 PP&A Project No.: 2784...

377

Reliable Link Maintenance in Cognitive Radio Systems  

E-Print Network [OSTI]

resources and overcome the under-utilization of licensed spectrum. Since the licensed user still keeps) have to vacate the spectrum in case the licensed user claims it. In order to maintain the qualityReliable Link Maintenance in Cognitive Radio Systems Daniel Willkomm, James Gross and Adam Wolisz

Gross, James

378

Reliability centered maintenance for substation equipment  

SciTech Connect (OSTI)

This paper is a collection of training materials on the principles and implementation of reliability centered maintenance. The main areas discussed in this presentation are organized as follows: RCM principles and concepts; RCM tools, resources and methods; overview of the RCM process; example RCM application; living PM program; RCM implementation experience.

NONE

1996-08-01T23:59:59.000Z

379

ICD Complex Operations and Maintenance Plan  

SciTech Connect (OSTI)

This Operations and Maintenance (O&M) Plan describes how the Idaho National Laboratory (INL) conducts operations, winterization, and startup of the Idaho CERCLA Disposal Facility (ICDF) Complex. The ICDF Complex is the centralized INL facility responsible for the receipt, storage, treatment (as necessary), and disposal of INL Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) remediation waste.

Gibson, P. L.

2007-06-25T23:59:59.000Z

380

Facilities Cost Pool: Maintenance Service Responsibilities  

E-Print Network [OSTI]

C 16 EXTERIOR LANDSCAPING University Standard FM FM C 17 EXTERIOR STD BUILDING SIGNS FM FM FM FM FMD 22 DATA POINT MONITORING Environmental building standard FM FM C Cost Pool: Maintenance Service Responsibilities 2 Table of Contents 3 Building Shell

Gulliver, Robert

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Maintenance efficace de documents XML volumineux  

E-Print Network [OSTI]

or maintain temporal XML documents, keeping track of data evolution over time. In this paper, we followMaintenance efficace de documents XML volumineux Mohamed-Amine Baazizi 1 , Nicole Bidoit 1 , Dario générer ou maintenir des documents és- tampillés garantissant un stockage efficace. Pour ce faire, nous

Boyer, Edmond

382

Automatic high-fidelity 3D road network modeling based on 2D GIS data  

Science Journals Connector (OSTI)

Abstract Many computer applications such as racing games and driving simulations demand high-fidelity 3D road network models. However, few methods exist for the automatic generation of 3D realistic road networks, especially for those in the real world. On the other hand, vast 2D road network data in various geographical information systems (GIS) have been collected in the past and are used by a wide range of applications. A method that can automatically produce 3D high-fidelity road network models from 2D real road GIS data will significantly reduce both the labor and time cost, and greatly benefit applications involving road networks. Based on a set of carefully selected civil engineering rules for road design, this paper proposes a novel approach that transforms existing road GIS data that contain only 2D road centerline information into high-fidelity 3D road network models. The proposed method consists of several major components, including road GIS data preprocessing, 3D centerline modeling, and 3D geometric modeling. With this approach, basic road elements such as road segments, road intersections and traffic interchanges are generated automatically to compose sophisticated road networks in a seamless manner. Results show that this approach provides a rapid and efficient 3D road modeling method for applications that have stringent requirements on high-fidelity road models.

Jie Wang; Gary Lawson; Yuzhong Shen

2014-01-01T23:59:59.000Z

383

Categorical Exclusion Determinations: West Valley Demonstration Project |  

Broader source: Energy.gov (indexed) [DOE]

Valley Demonstration Valley Demonstration Project Categorical Exclusion Determinations: West Valley Demonstration Project Categorical Exclusion Determinations issued by West Valley Demonstration Project. DOCUMENTS AVAILABLE FOR DOWNLOAD July 11, 2013 CX-010718: Categorical Exclusion Determination Replacement Ventilation System for the Main Plant Process Building CX(s) Applied: B6.3 Date: 07/11/2013 Location(s): New York Offices(s): West Valley Demonstration Project December 20, 2012 CX-009527: Categorical Exclusion Determination WVDP-2012-02 Routine Maintenance CX(s) Applied: B1.3 Date: 12/20/2012 Location(s): New York Offices(s): West Valley Demonstration Project August 2, 2012 CX-009528: Categorical Exclusion Determination WVDP-2012-01 WVDP Reservoir Interconnecting Canal Maintenance Activities

384

Online Monitoring to Enable Improved Diagnostics, Prognostics and Maintenance  

SciTech Connect (OSTI)

For both existing and new plant designs there are increasing opportunities and needs for the application of advanced online surveillance, diagnostic and prognostic techniques. These methods can continuously monitor and assess the health of nuclear power plant systems and components. The added effectiveness of such programs has the potential to enable holistic plant management, and minimize exposure to future and unknown risks. The 'NDE & On-line Monitoring' activities within the Advanced Instrumentation, Information and Control Systems (II&CS) Pathway are developing R&D to establish advanced condition monitoring and prognostics technologies to understand and predict future phenomena, derived from plant aging in systems, structures, and components (SSC). This research includes utilization of the enhanced functionality and system condition awareness that becomes available through the application of digital technologies at existing nuclear power plants for online monitoring and prognostics. The current state-of-the-art for on-line monitoring applied to active components (eg pumps, valves, motors) and passive structure (eg core internals, primary piping, pressure vessel, concrete, cables, buried pipes) is being reviewed. This includes looking at the current deployment of systems that monitor reactor noise, acoustic signals and vibration in various forms, leak monitoring, and now increasingly condition-based maintenance (CBM) for active components. The NDE and on-line monitoring projects are designed to look beyond locally monitored CBM. Current trends include centralized plant monitoring of SSC, potential fleet-based CBM and technology that will enable operation and maintenance to be performed with limited on-site staff. Attention is also moving to systems that use online monitoring to permit longer term operation (LTO), including a prognostic or predictive element that estimates a remaining useful life (RUL). Many, if not all, active components (pumps, valves, motors etc.) can be well managed, routinely diagnosed, analyzed and upgraded as needed using a combination of periodic and online CBM. The ability to successfully manage passive systems and structures is seen as the key to LTO, particularly in the USA. New approaches will be demonstrated, including prognostics for passive structures, which is critical to maintaining safety and availability and to reducing operations and maintenance costs for NPP's. To provide proactive on-line monitoring that includes estimates for RUL new projects will include advanced sensors, better understanding of stressors and challenges faced in quantification of uncertainty associated with RUL. This program area will leverage insights from past experience in other industries and seek to demonstrate the feasibility of on-line monitoring and prognostics to support NPP LTO.

Bond, Leonard J.

2011-02-01T23:59:59.000Z

385

Resources on Operations and Maintenance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Operations & Maintenance » Resources on Operations & Maintenance » Resources on Operations and Maintenance Resources on Operations and Maintenance October 7, 2013 - 9:55am Addthis Many helpful resources about operations and maintenance are available. Also see Contacts. Best Practices Operations and Maintenance Best Practices Guide: Document outlines best practices to help Federal agencies implement effective O&M for systems and equipment found at their facilities. Federal Facilities Council: Website featuring events, reports, and links to National Academy websites. Commissioning Commissioning for Federal Facilities: Comprehensive information about ongoing commissioning processes to resolve operating problems, improve comfort, optimize energy use, and identify retrofits for commercial and

386

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Project Fact Sheet Project Brief: Construction Project Team: Project Facts & Figures: Budget: £1.1M Funding Source: Departmental Construction Project Programme: Start on Site: November 2010 End Date : March 2011 Occupation Date: March 2011 For further information contact Project Manager as listed above

387

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: The works cover the refurbishment of floors 4, 5 operating theatre. The Bionanotechnology Centre is one of the projects funded from the UK Government's £20.imperial.ac.uk/biomedeng Construction Project Team: Project Facts & Figures: Budget: £13,095,963 Funding Source: SRIF II and Capital

388

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Project Fact Sheet Project Brief: This project refurbished half of the 5th and 7th floors on the Faculty of Medicine, please visit: http://www1.imperial.ac.uk/medicine/ Construction Project Team: Project Facts & Figures: Budget: £3,500,000 Funding Source: SRIF III Construction Project Programme: Start

389

M.-T. DO, P. MARSAC, Y. DELANNE Prediction of Tire/Wet Road Friction from  

E-Print Network [OSTI]

M.-T. DO, P. MARSAC, Y. DELANNE 1 Prediction of Tire/Wet Road Friction from Road Surface, validation of a contact model for the prediction of low-speed friction from road surface microtexture the friction ­ speed curve from road- and tire measurable parameters. The model development is briefly

Paris-Sud XI, Université de

390

Project Year Project Team  

E-Print Network [OSTI]

An Engineer's Guide to the Structures of Baltimore Audience Students from the Krieger School of Arts City, interfaced through a course website, the team will integrate descriptions of structural behavior format. Technologies Used HTML/Web Design, MySQL Project Abstract Structural analysis is typically taught

Gray, Jeffrey J.

391

Project Year Project Team  

E-Print Network [OSTI]

information systems (GIS) tools to design maps that integrate data for visualizing geographic concepts School of Engineering Project Title GIS & Introductory Geography Audience Undergraduate students on how to use the Internet for geographic research, and an interactive introduction to GIS through online

Gray, Jeffrey J.

392

Project Management Project Managment  

E-Print Network [OSTI]

­ Inspired by agile methods #12;Background · Large-scale software development & IT projects, plagued relations #12;One Agile Approach to Scheduling · The creative nature of game development resist heavy up Problems ­incompatible platforms, 3rd party etc. #12;Is Games Development Similar? · Yes & No

Stephenson, Ben

393

Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Ryder Opens Natural Ryder Opens Natural Gas Vehicle Maintenance Facility to someone by E-mail Share Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on Facebook Tweet about Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on Twitter Bookmark Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on Google Bookmark Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on Delicious Rank Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on Digg Find More places to share Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on AddThis.com... June 28, 2011 Ryder Opens Natural Gas Vehicle Maintenance Facility

394

SURVEILLANCE AND MAINTENANCE RBSM The Requirements Based Surveillance  

Broader source: Energy.gov (indexed) [DOE]

AND MAINTENANCE AND MAINTENANCE RBSM The Requirements Based Surveillance and Maintenance Review Process Surveillance and Maintenance Overview What is RBSM and why do I need this process? Who has used this process so far? A Summary of RBSM results across the DOE complex Viewing a sample RBSM report Performing RBSM at your facility RBSM Guidance package Surveillance and Maintenance Overview Overall direction for surveillance and maintenance of excess facilities is addressed in DOE G 430.1-2, IMPLEMENTATION GUIDE FOR SURVEILLANCE AND MAINTENANCE DURING FACILITY TRANSITION AND DISPOSITION. In addition, the change in mission and operation of an excess facility should stimulate a review of surveillance and maintenance to determine what efficiencies can be gained as a result of the change.

395

Surveillance & Maintenance: The Requirements Based Surveillance and  

Broader source: Energy.gov (indexed) [DOE]

Surveillance & Maintenance: The Requirements Based Surveillance and Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Overall direction for surveillance and maintenance of excess facilities is addressed in DOE G 430.1-2, IMPLEMENTATION GUIDE FOR SURVEILLANCE AND MAINTENANCE DURING FACILITY TRANSITION AND DISPOSITION. In addition, the change in mission and operation of an excess facility should stimulate a review of surveillance and maintenance to determine what efficiencies can be gained as a result of the change. Such a review can be applied to facilities that undergoing stabilization, those intended for deactivation, and others destined for decommissioning. The material that follows provides

396

Article Published on LED Lumen Maintenance and Light Loss Factors...  

Broader source: Energy.gov (indexed) [DOE]

Article Published on LED Lumen Maintenance and Light Loss Factors Article Published on LED Lumen Maintenance and Light Loss Factors January 20, 2014 - 12:00am Addthis An article...

397

Energy Conservation Thru Steam Trap Surveys and Preventive Maintenance Programs  

E-Print Network [OSTI]

ENERGY CONSERVATION THRU STEAM TRAP SURVEYS AND PREVENTIVE MAINTENANCE PROGRAMS Terry Boynton, Armstrong, Three Rivers, Mich. Bob Dewhirst, Armstrong, New Braunfels, Texas. This paper will deal with steam trap surveys and preventive maintenance...

Boynton, T.; Dewhirst, B.

1980-01-01T23:59:59.000Z

398

Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

CNG Fuel System and CNG Fuel System and Cylinder Maintenance to someone by E-mail Share Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance on Facebook Tweet about Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance on Twitter Bookmark Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance on Google Bookmark Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance on Delicious Rank Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance on Digg Find More places to share Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance on AddThis.com... More in this section... Natural Gas Basics Benefits & Considerations Stations Vehicles Availability Conversions Emissions Maintenance & Safety

399

Dillard Road Solar Power Facility | Open Energy Information  

Open Energy Info (EERE)

Dillard Road Solar Power Facility Dillard Road Solar Power Facility Jump to: navigation, search Name Dillard Road Solar Power Facility Facility Dillard Road Solar Power Facility Sector Solar Facility Type Photovoltaics Facility Status In Service Developer Recurrent Energy Energy Purchaser Sacramento Municipal Utility District Location Elk Grove, California Coordinates 38.465275°, -121.17847° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.465275,"lon":-121.17847,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

400

End of the road for Roadrunner | National Nuclear Security Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

End of the road for Roadrunner | National Nuclear Security Administration End of the road for Roadrunner | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > End of the road for Roadrunner End of the road for Roadrunner Posted By Office of Public Affairs This weekend, Roadrunner, the World's Fastest Supercomputer from 2008, will be switched off but not be forgotten.

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

One Woman's Road to Recovery | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

One Woman's Road to Recovery One Woman's Road to Recovery One Woman's Road to Recovery October 19, 2010 - 6:04pm Addthis One Woman's Road to Recovery Jo Napolitano Media Specialist, Argonne National Laboratory Editor's Note: Cross-posted from Argonne National Lab's Portraits of ARRA. Rebecca Bivens, who worked for a major oil company for seven years before she was laid off in January 2008, was elated to land a job that summer at one of the world's largest equipment manufacturers. That is, until the company laid off her entire division the night before Christmas Eve. "No one saw it coming," said Bivens, who spent years working in safety and procurement. "Just the month before, they said we were doing great. After losing two jobs in a year, it was pretty depressing. It was scary."

402

End of the road for Roadrunner | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

End of the road for Roadrunner | National Nuclear Security Administration End of the road for Roadrunner | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > End of the road for Roadrunner End of the road for Roadrunner Posted By Office of Public Affairs This weekend, Roadrunner, the World's Fastest Supercomputer from 2008, will be switched off but not be forgotten.

403

Distributing Urea for the On-Road Vehicle Market | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

21st Century Truck Programs. 2006deerjackson.pdf More Documents & Publications Nonroad SCR-Urea Study Ensuring the Availability and Reliability of Urea Dosing For On-Road and...

404

The Road to a Sustainable Energy Future | Princeton Plasma Physics...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

31, 2015, 9:30am to 11:00am Science On Saturday MBG Auditorium The Road to a Sustainable Energy Future Professor Emily Carter, Department of Engineering; Director of the Andlinger...

405

Predicting and Utilizing the Vehicle's Past and Futuer Road Grade  

Broader source: Energy.gov [DOE]

Predicted road grade may be used to estimate the power required to propel the vehicle through the upcoming terrain so that the engine controller can deliver the necessary power.

406

Comparison of On-Road Portable and Bench Emission Measurements  

Broader source: Energy.gov [DOE]

Chassis dynamometer testing using a conventional emissions bench and on-road testing with a portable emissions system were performed to compare exhaust emissions from selected vehicles by both techniques.

407

An Integrated Measurement to Road Vibration Simulation System  

E-Print Network [OSTI]

An Integrated Measurement to Road Vibration Simulation System Charles Birdsong, Ph.D. Dactron Inc for vibrations measured on a Jeep, compensated, and replicated on an electrodynamic shaker. Introduction. Simulation of measured vibrations requires data acquisition, data compensation, and reproduction

Birdsong, Charles

408

Sheila I. Smith 117 Phillips Road (518) 301-5158  

E-Print Network [OSTI]

Sheila I. Smith 117 Phillips Road (518) 301-5158 Valley Falls, NY, 12185 ssmith4@albany.edu DOB: 12 for Excellence in Nanotechnology (4-year) ­ Spring 2010 Publications Rajan Kumar, Sheila Smith, James Mc

Daly, Samantha

409

Linear Road : benchmarking stream-based data management systems  

E-Print Network [OSTI]

This thesis describes the design, implementation, and execution of the Linear Road benchmark for stream-based data management systems. The motivation for benchmarking and the selection of the benchmark application are ...

Tibbetts, Richard S. (Richard Singleton), 1979-

2003-01-01T23:59:59.000Z

410

Marsh Road Power Plant Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Marsh Road Power Plant Biomass Facility Marsh Road Power Plant Biomass Facility Jump to: navigation, search Name Marsh Road Power Plant Biomass Facility Facility Marsh Road Power Plant Sector Biomass Facility Type Landfill Gas Location San Mateo County, California Coordinates 37.4337342°, -122.4014193° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.4337342,"lon":-122.4014193,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

411

One Woman's Road to Recovery | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

One Woman's Road to Recovery One Woman's Road to Recovery One Woman's Road to Recovery October 19, 2010 - 6:04pm Addthis One Woman's Road to Recovery Jo Napolitano Media Specialist, Argonne National Laboratory Editor's Note: Cross-posted from Argonne National Lab's Portraits of ARRA. Rebecca Bivens, who worked for a major oil company for seven years before she was laid off in January 2008, was elated to land a job that summer at one of the world's largest equipment manufacturers. That is, until the company laid off her entire division the night before Christmas Eve. "No one saw it coming," said Bivens, who spent years working in safety and procurement. "Just the month before, they said we were doing great. After losing two jobs in a year, it was pretty depressing. It was scary."

412

Western Area Power Administration, Desert Southwest Region Parker-Gila 161-kV Transmission Line Maintenance, Cross Arm  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Parker-Gila 161-kV Transmission Line Maintenance, Cross Arm Parker-Gila 161-kV Transmission Line Maintenance, Cross Arm Replacements at Structure 0/7 - Continuation Sheet Special Conditions Biological Resources 1. To avoid impacts to nesting birds, project activities will be scheduled between August 1 and February 15, as feasible. Crews shall not cause injury or death to nesting birds, active nests, eggs, or nestlings. If evidence of a nesting bird is found in the project area, crews shall immediately stop work in that area until Western's Environmental Group has been contacted. 2. A qualified biologist will be present during all project activities and serve as the project's Biological Monitor. The Biological Monitor will be authorized by Western to temporarily halt construction activity if needed to prevent harm to desert tortoise. The Biological Monitor's

413

Operations & Maintenance Best Practices Guide: Release 3.0  

Broader source: Energy.gov [DOE]

Guide covers version 3.0 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

414

Maintenance and Operations study for K basins sludge treatment  

SciTech Connect (OSTI)

This study evaluates maintenance and operating concepts for the chemical treatment of sludge from the 100 K Basins at Hanford. The sludge treatment equipment that will require remote operation or maintenance was identified. Then various maintenance and operating concepts used in the nuclear industry were evaluated for applicability to sludge treatment. A hot cell or cells is recommended as the best maintenance and operating concept for a sludge treatment facility.

WESTRA, A.G.

1998-11-30T23:59:59.000Z

415

Operations and Maintenance Training | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Training Training Operations and Maintenance Training October 16, 2013 - 5:01pm Addthis Key Actions in O&M Training Have O&M staff shadow Commissioning Agent during commissioning for early interaction with new renewable energy equipment. Train facility staff fully on O&M manual and building systems, regardless of O&M contracts on renewable energy systems. Provide key facility staff with general renewable energy and LEED training prior to building start-up. Look for opportunities for O&M staff to learn from external O&M contractors. To keep a renewable energy system performing at optimal levels, operations and maintenance (O&M) personnel must receive thorough training. A renewable energy system may be properly installed, but without a robust O&M program in place, it will not perform as specified over the long-term.

416

Maintenance Management Program for DOE Nuclear Facilities  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of Structures, Systems and Components (SSCs) that are part of the safety basis required by 10 CFR 830.202.1 at hazard category 1, 2 and 3 Department of Energy (DOE) nuclear facilities. Cancels DOE O 433.1. Canceled by DOE O 433.1B.

2007-02-13T23:59:59.000Z

417

Maintenance Management Program for DOE Nuclear Facilities  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of structures, systems and components that are part of the safety basis required by 10 CFR 830.202 at hazard category 1, 2 and 3 DOE nuclear facilities. Admin Chg 1, dated 3-12-2013. Cancels DOE O 433.1A.

2010-04-21T23:59:59.000Z

418

Maintenance Management Program for DOE Nuclear Facilities  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of structures, systems and components that are part of the safety basis required by 10 CFR 830.202 at hazard category 1, 2 and 3 DOE nuclear facilities. Cancels DOE O 433.1A. Admin Chg 1, dated 3-12-2013, cancels DOE O 433.1B.

2010-04-21T23:59:59.000Z

419

Project Records Information System (PRIS)  

SciTech Connect (OSTI)

The Project Records Information System (PRIS) is an interactive system developed for the Information Services Division (ISD) of Martin Marietta Energy Systems, Inc., to perform indexing, maintenance, and retrieval of information about Engineering project record documents for which they are responsible. This PRIS User's Manual provides instruction on the use of this system. This manual presents an overview of PRIS, describing the system's purpose; the data that it handles; functions it performs; hardware, software, and access; and help and error functions. This manual describes the interactive menu-driven operation of PRIS. Appendixes A, B, C, and D contain the data dictionary, help screens, report descriptions, and a primary menu structure diagram, respectively.

Smith, P.S.; Schwarz, R.K.

1990-11-01T23:59:59.000Z

420

Software Maintenance and Evolution: Keith Bennett & Vaclav Rajlich  

E-Print Network [OSTI]

for change and improvements. Our aim is to describe a landscape for research in software maintenanceSoftware Maintenance and Evolution: A Roadmap Keith Bennett & Vaclav Rajlich Key Research Pointers transformation techniques. He is a founding co-Director of the Centre for Software Maintenance at Durham

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Maintenance Approaches For ARIES-CS Power Core  

E-Print Network [OSTI]

of Fusion Energy September 14-16, 2004 Madison, WI #12;2 Outline Introduction Reactor parameters Maintenance approach based on field-period units Modular maintenance approach through selected ports Maintenance approach with ports between all the modular coils Summary and conclusion #12;3 Introduction The engineering

422

Project Accounts  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

» Project Accounts » Project Accounts Project Accounts Overview Project accounts are designed to facilitate collaborative computing by allowing multiple users to use the same account. All actions performed by the project account are traceable back to the individual who used the project account to perform those actions via gsisshd accounting logs. Requesting a Project Account PI's, PI proxies and project managers are allowed to request a project account. In NIM do "Actions->Request a Project Account" and fill in the form. Select the repository that the Project Account is to use from the drop-down menu, "Sponsoring Repository". Enter the name you want for the account (8 characters maximum) and a description of what you will use the account for and then click on the "Request Project Account" button. You

423

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: A state of the art facility, at Hammersmith information visit the Faculty of Medicine web pages http://www1.imperial.ac.uk/medicine/ Construction Project Team: Project Facts & Figures: Budget: £60 000 000 Funding Source: SRIF II (Imperial College), GSK, MRC

424

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: The refurbishment of the instrumentation equipment. This project encompasses refurbishment work on over 1,150m2 of laboratory space across four, the completed project will allow researchers to expand their work in satellite instrumentation, the fabrication

425

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Project Fact Sheet Project Brief: In the first phase of the Union Building re.union.ic.ac.uk/marketing/building Construction Project Team: Project Facts & Figures: Budget: £1,400,000 Funding Source: Capital Plan and Imperial College Union reserves Construction Project Programme: Start on Site: August 2006 End Date: March

426

Volume Project  

E-Print Network [OSTI]

Math 13900. Volume Project. For the following project, you may use any materials. This must be your own original creation. Construct a right pyramid with a base...

rroames

2010-01-12T23:59:59.000Z

427

IT Project Management | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Management Management IT Project Management Qualification, Engineering and Quality Assurance The purpose of the Department of Energy (DOE) IT Project Management, Engineering, and Quality Assurance effort is to lead and provide guidance to information technology programs, and to support the successful development and maintenance of Departmental site-specific information systems. This is accomplished by fostering and mentoring continuous growth and maturity in the use of best practices for project management, software systems engineering, and quality assurance and soliciting DOE-wide participation and successes for sharing. IT Project Management, Engineering, and Quality Assurance is a component of the DOE Enterprise Architecture Program and Capital Planning and Investment

428

PREVENTIVE MAINTENANCE LEADS TO EARLY DETECTION AT WIPP SITE | Department  

Broader source: Energy.gov (indexed) [DOE]

PREVENTIVE MAINTENANCE LEADS TO EARLY DETECTION AT WIPP SITE PREVENTIVE MAINTENANCE LEADS TO EARLY DETECTION AT WIPP SITE PREVENTIVE MAINTENANCE LEADS TO EARLY DETECTION AT WIPP SITE September 1, 2011 - 12:00pm Addthis The new wire rope before installation. The new wire rope before installation. URS Washington TRU Solutions operations and maintenance crews demonstrate exceptional performance to replace a steel rope. URS Washington TRU Solutions operations and maintenance crews demonstrate exceptional performance to replace a steel rope. The new wire rope before installation. URS Washington TRU Solutions operations and maintenance crews demonstrate exceptional performance to replace a steel rope. Carlsbard, NM - The effectiveness of the Waste Isolation Pilot Plant's (WIPP) preventive maintenance program paid huge dividends late last month

429

Operations & Maintenance Best Practices Guide: Release 3.0  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Chapter 5 Types of Maintenance Programs Chapter 5 Types of Maintenance Programs � 5.1 Introduction What is maintenance and why is it performed? Past and current maintenance practices in both the private and government sectors would imply that maintenance is the actions associated with equipment repair after it is broken. The dictionary defines maintenance as follows: "the work of keeping something in proper condition; upkeep." This would imply that maintenance should be actions taken to prevent a device or component from failing or to repair normal equipment degradation experienced with the operation of the device to keep it in proper working order. Unfortunately, data obtained in many studies over the past decade indicates that most private and government facilities do not expend the necessary resources to maintain equipment in proper working

430

Federal Energy Management Program: Operations and Maintenance for Major  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for Major Equipment Types to someone by E-mail for Major Equipment Types to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance for Major Equipment Types on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance for Major Equipment Types on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance for Major Equipment Types on Google Bookmark Federal Energy Management Program: Operations and Maintenance for Major Equipment Types on Delicious Rank Federal Energy Management Program: Operations and Maintenance for Major Equipment Types on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance for Major Equipment Types on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance

431

Operations & Maintenance Best Practices Guide: Release 3.0  

Broader source: Energy.gov (indexed) [DOE]

Chapter 5 Types of Maintenance Programs Chapter 5 Types of Maintenance Programs � 5.1 Introduction What is maintenance and why is it performed? Past and current maintenance practices in both the private and government sectors would imply that maintenance is the actions associated with equipment repair after it is broken. The dictionary defines maintenance as follows: "the work of keeping something in proper condition; upkeep." This would imply that maintenance should be actions taken to prevent a device or component from failing or to repair normal equipment degradation experienced with the operation of the device to keep it in proper working order. Unfortunately, data obtained in many studies over the past decade indicates that most private and government facilities do not expend the necessary resources to maintain equipment in proper working

432

Solar Water Heating System Maintenance and Repair | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Water Heating System Maintenance and Repair Water Heating System Maintenance and Repair Solar Water Heating System Maintenance and Repair May 30, 2012 - 2:35pm Addthis Rooftop solar water heaters need regular maintenance to operate at peak efficiency. | Photo from iStockphoto.com Rooftop solar water heaters need regular maintenance to operate at peak efficiency. | Photo from iStockphoto.com Solar energy systems require periodic inspections and routine maintenance to keep them operating efficiently. Also, from time to time, components may need repair or replacement. You should also take steps to prevent scaling, corrosion, and freezing. You might be able to handle some of the inspections and maintenance tasks on your own, but others may require a qualified technician. Ask for a cost estimate in writing before having any work done. For some systems, it may

433

31 Tannery Road- Ferreira Construction Headquarters  

High Performance Buildings Database

Branchburg, NJ The 31 Tannery project, located in Branchburg, New Jersey, is the corporate headquarters for Ferreira Construction and Ferreira Group. The facility is 42,000 square feet and serves as office space, shop, and living lab. This state-of-the-art facility raises the bar for a commercial high-performance building, with an eye towards energy independence.

434

Project Controls  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Project controls are systems used to plan, schedule, budget, and measure the performance of a project/program. The cost estimation package is one of the documents that is used to establish the baseline for project controls. This chapter gives a brief description of project controls and the role the cost estimation package plays.

1997-03-28T23:59:59.000Z

435

Searchlight Wind Energy Project FEIS Appendix F  

Broader source: Energy.gov (indexed) [DOE]

F F Page | F 22B Appendix F: Literature Review of Socioeconomic Effects of Wind Project and Transmission Lines Searchlight Wind Energy Project FEIS Appendix F Page | 1 Prepared for" The Bureau of Land Management For the Searchlight Wind Energy Project Prepared by Bootstrap Solutions 752 E. Braemere Road Boise, ID 83702 Literature on Property Value Impacts of Wind Projects The economic effects of wind energy projects have been well documented. Several studies that have evaluated potential property value impacts are highlighted below (organized chronologically). No clear inference can be drawn from these studies and available research as the analyses vary in terms of rigor; methodology (e.g., survey sampling, statistical analysis, and expert opinion); size, location and site

436

Steam turbine path evaluation during maintenance  

SciTech Connect (OSTI)

The deterioration of a turbine (Steam & Gas) flow path affects the efficiency of the turbine. The most critical factors which affect the efficiency of turbines are: wearing out of the trailing edges of the blades by solid particle erosion, deposits, material loss due to corrosion (also sand blast) which increases the flow area, increases in blade surface roughness, etc. Wearing out of the seals caused by shaft vibrations or rapid start-up leads to significant leakage losses. Some of these effects can be estimated with some precision during operation of the turbine, but an exact evaluation can be carried out during a maintenance applying a special fluid flow analysis program. Such a program has been developed and then adapted to achieve this goal. During maintenance the complete geometry of the steam path is measured (blades lengths, widths, angles, clearances, etc.) in the condition encountered before any corrections. Then the similar measurement is undertaken after, for example, clearance corrections, blade replacements, cleaning of the blades, etc. Using the program first of all the design data is calculated. Then the actual data is fed into the program and compared to the design data. Thus the effect of the blade surface roughness, increased seal clearances, flow area increase, solid particle damage to the trailing edge and so on for each particular stage is calculated. The effect is expressed in [kW] as a deviation from the design points. This data can be helpful during online evaluation of the turbine performance. This evaluation helps the management of the plant in undertaking the correct decision concerning the date of the next major maintenance and replacement part procurement. Many turbines in the Mexican utility have been evaluated in such a manner. Some examples are presented.

Kubiak, J.; Angel, F. del; Carnero, A.; Campos, A. [Instituto de Investigaciones Electricas, Temixo, Morelos (Mexico)] [and others

1996-07-01T23:59:59.000Z

437

EA-1116: Kalina Geothermal Demonstration Project, Steamboat Springs, Nevada  

Broader source: Energy.gov (indexed) [DOE]

16: Kalina Geothermal Demonstration Project, Steamboat 16: Kalina Geothermal Demonstration Project, Steamboat Springs, Nevada EA-1116: Kalina Geothermal Demonstration Project, Steamboat Springs, Nevada SUMMARY This EA evaluates the environmental impacts of the proposal for the U.S. Department of Energy Golden Field Office to partially fund assistance for the construction and operation of a privately owned 6-megawatt geothermal power plant which includes one geothermal production well, one injection well, and ancillary facilities such as on-site access road(s) and interconnected to electric transmission lines to existing geothermal power plants. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD February 22, 1999 EA-1116: Finding of No Significant Impact Kalina Geothermal Demonstration Project, Steamboat Springs, Nevada

438

Mitigation Action Plan Phase I Lovell Yellowtail and Basin-Lovell Transmission Line Rebuild Project  

Broader source: Energy.gov (indexed) [DOE]

Mitigation Action Plan Phase I Lovell Yellowtail and Basin-Lovell Transmission Line Rebuild Project Big Horn and Carbon Counties, Montana and Big Horn County, Wyoming MITIGATION ACTION IDENTIFIER RESPONSIBLE PARTY FOR IMPLEMENTING MITIGATION ACTION LOCATION IF AVAILABLE/ STRUCTURE NUMBERS PARTY RESPONSIBLE FOR MONITORING AND ENSURING COMPLIANCE 1 Construction Contractor Western Maintenance Standard Construction Project Practices will be implemented through Phases I of Project construction and operation (Table 2.1-3 in the Final EA.) Western Construction (during Construction Phase) Western Maintenance (During maintenance of facility) NPS - WESTERN INTERAGENCY AGREEMENT FOR BIGHORN CANYON NRA 2 NPS, Western The Interagency Agreement between United

439

An Open Source Laboratory for Operating Systems Projects Mark Claypool, David Finkel and Craig Wills *  

E-Print Network [OSTI]

1 An Open Source Laboratory for Operating Systems Projects Mark Claypool, David Finkel and Craig 100 Institute Road Worcester, MA 01609 Abstract Typical undergraduate operating systems projects use services provided by an operating system via system calls or develop code in a simulated operating system

Claypool, Mark

440

INFOGRAPHIC: The Road to Fuel Efficiency | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

The Road to Fuel Efficiency The Road to Fuel Efficiency INFOGRAPHIC: The Road to Fuel Efficiency November 27, 2012 - 11:01am Addthis This infographic takes a look at fuel economy standards and how recent improvements in these standards will benefit consumers and the U.S. economy. | Infographic by Sarah Gerrity. This infographic takes a look at fuel economy standards and how recent improvements in these standards will benefit consumers and the U.S. economy. | Infographic by Sarah Gerrity. Sarah Gerrity Sarah Gerrity Multimedia Editor, Office of Public Affairs The Obama Administration's new national fuel economy standards for passenger vehicles will improve vehicle efficiency and save Americans money at the pump, all while reducing our dependence on foreign oil and growing

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Bruceville Road Solar Power Facility | Open Energy Information  

Open Energy Info (EERE)

Bruceville Road Solar Power Facility Bruceville Road Solar Power Facility Jump to: navigation, search Name Bruceville Road Solar Power Facility Facility Bruceville Solar Power Facility Sector Solar Facility Type Photovoltaics Facility Status In Service Developer Recurrent Energy Energy Purchaser Sacramento Municipal Utility District Location Elk Grove, California Coordinates 38.347479°, -121.412498° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.347479,"lon":-121.412498,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

442

TRUPACT-II Operating and Maintenance Instructions  

SciTech Connect (OSTI)

The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II) Shipping Package and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP) and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9218. In the event there is a conflict between this document and the TRUPACT-II SARP, the TRUPACT-II SARP shall govern. TRUPACT-II C of C number 9218 states, ''... each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application.'' It further states, ''... each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the application.'' Chapter 9 of the TRUPACT-II SARP charges the Westinghouse Electric Corporation Waste Isolation Division (WID) with assuring that the TRUPACT-II is used in accordance with the requirements of the C of C. To meet this requirement and verify consistency of operations when loading and unloading the TRUPACT-II on the trailer, placing a payload in the packaging, unloading the payload from the packaging, or performing maintenance, the U.S. Department of Energy Carlsbad Area Office (U.S. DOE/CAO) finds it necessary to implement the changes that follow. This TRUPACT-II maintenance document represents a change to previous philosophy regarding site specific procedures for the use of the TRUPACT-II. This document details the instructions to be followed to consistently operate and maintain the TRUPACT-II. The intent of these instructions is to ensure that all users of the TRUPACT-II follow the same or equivalent instructions. Users may achieve this intent by any of the following methods: (1) Utilizing these instructions as is, or (2) Attaching a site-specific cover page/letter to this document stating that these are the instructions to be used at their location, or (3) Sites may prepare their own document using the steps in this document word-for-word, in-sequence, including Notes and Cautions. Site specific information may be included as deemed necessary. Submit the document to WID National TRU Programs for approval. Any revision made subsequent to WID TRU Program's approval shall be reviewed and approved by WID TRU Programs. A copy of the approval letter from WID National TRU Programs should be available for audit purposes. Users shall develop site-specific procedures addressing leak testing, preoperational activities, quality assurance, hoisting and rigging, and radiation health physics to be used in conjunction with the instructions contained in this document. Users desiring to recommend changes to this document may submit their recommendations to the WID National TRU Programs for evaluation. If approved, the change(s) will be incorporated into this document for use by all TRUPACT-II users. User sites will be audited to this document to ensure compliance within one year from the effective date of this revision. This document discusses operating instructions, required inspections and maintenance for the following: TRUPACT-II packaging, and Miscellaneous packaging, special tools, and equipment. Packaging and payload handling equipment and transport trailers have been specifically designed for use with the TRUPACT-II Packaging. This document discusses the required instructions for use of the following equipment in conjunction with the TRUPACT-II Packaging: TRUPACT-II Mobile Loading Unit (MLU), Adjustable Center-of-Gravity Lift Fixture (ACGLF), and TRUPACT-II Transport Trailer. Attachment E contains the various TRUPACT-II packaging interface control drawings, leak-test and vent-port tool drawings, ACGLF drawings, and tie-down drawings that identify the various system components.

Westinghouse Electric Corporation, Waste Isolation Division

1999-12-31T23:59:59.000Z

443

Microsoft Word - CX-Colville-Republic-Maintenance-FY13_WEB.docx  

Broader source: Energy.gov (indexed) [DOE]

REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Terry Kugler Lineman Foreman III - TFSF-Bell Proposed Action: Routine maintenance on the Colville-Republic No. 1 transmission line PP&A Project No.: 2,139 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance Location: Ferry and Stevens counties, Washington; Bonneville Power Administration's (BPA) Bell District Proposed by: BPA Description of the Proposed Action: BPA proposes to replace deteriorating wood pole towers and associated components (e.g. cross arms, insulators, guy anchors, etc.) along its Colville- Republic No. 1, 115-kilovolt transmission line in Ferry and Stevens counties, Washington. This

444

Best-in-Class Project Management Initiative Corporate Implementation Plan  

Broader source: Energy.gov (indexed) [DOE]

Best-in-Class Project Management Initiative Best-in-Class Project Management Initiative Corporate Implementation Plan Final Prepared for: U.S. Department of Energy Prepared by: U.S. Army Corps of Engineers, Huntington District and Project Time & Cost, Inc. 2727 Paces Ferry Road, Suite 1-1200 Atlanta, Georgia 30339 March 14, 2008 TOC - 1 Table of Contents Executive Summary ............................................................................................................. i 1.0 Introduction................................................................................................................ 1 1.1 Vision for Best-in-Class Project Management Initiative ........................................ 1 1.2 Strategy for Achieving BICPM ..............................................................................

445

Project title: Cottonwood-Roseville Optical Groundwire Project  

Broader source: Energy.gov (indexed) [DOE]

Cottonwood-Roseville Optical Groundwire Project Cottonwood-Roseville Optical Groundwire Project Requested By: Joe Oloriz Mail Code: N5706 Phone: 916-353-4773 Date Submitted: 7-3-13 Date Required: 7-8-13 Description of the Project: Purpose and Need The Western Area Power Administration (Western), Sierra Nevada Region (SNR), is responsible for the operation and maintenance (O&M) of federally owned and operated transmission lines, switchyards, and facilities throughout California. Western must comply with the National Electric Safety Code, Western States Coordinating Council (WECC), and internal directives for protecting human safety, the physical environment, and maintaining the reliable operation of the transmission system. The process of marketing and delivering electric power through transmission facilities requires a great

446

MAINTENANCE Assessment Plan, NNSA/Nevada Site Office Facility  

Broader source: Energy.gov (indexed) [DOE]

MAINTENANCE Assessment Plan, NNSA/Nevada Site Office Facility MAINTENANCE Assessment Plan, NNSA/Nevada Site Office Facility Representative Division MAINTENANCE Assessment Plan, NNSA/Nevada Site Office Facility Representative Division An effective facilities maintenance program should optimize the material condition of components and equipment to support safe and effective operations and ensure the peak performance and reliability of those systems and equipment important to operations. The program, facility or operation has a Maintenance Implementation Plan (MIP), or equivalent document, which defines and documents the approach to conduct of maintenance .Employees shall be encouraged to become involved in the identification and control of hazards in the workplace. (DOE O 440.1A CRD) Workers shall have the right, without reprisal, to accompany DOE worker

447

Project Implementation and O&M Webinar | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Project Implementation and O&M Webinar Project Implementation and O&M Webinar Project Implementation and O&M Webinar July 30, 2014 11:00AM MDT Attendees will become familiar with the last two steps of the five-step energy project development framework: Project Implementation (Step 4) and Operations and Maintenance (Step 5). Information on project management, reporting, monitoring, and commissioning will be provided. Other topics the presenters will cover include project agreements, vendor contracting process, preconstruction tasks, and equipment installation. The webinar will stress the importance of developing a long-term operations and maintenance (O&M) plan, establishing a maintenance schedule, replacing worn or disabled equipment, establishing and enhancing an effective and motivated O&M staff, evaluating warranty agreements and extensions, and

448

Science Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Argonne Argonne Science Project Ideas! Our Science Project section provides you with sample classroom projects and experiments, online aids for learning about science, as well as ideas for Science Fair Projects. Please select any project below to continue. Also, if you have an idea for a great project or experiment that we could share, please click our Ideas page. We would love to hear from you! Science Fair Ideas Science Fair Ideas! The best ideas for science projects are learning about and investigating something in science that interests you. NEWTON has a list of Science Fair linkd that can help you find the right topic. Toothpick Bridge Web Sites Toothpick Bridge Sites! Building a toothpick bridge is a great class project for physics and engineering students. Here are some sites that we recommend to get you started!

449

Projection Systems  

Science Journals Connector (OSTI)

As a general rule, broad-band sources which employ projection optics are the most difficult to evaluate. In addition to the problems encountered in evaluating exposed lamps, one must characterize the projected...

David Sliney; Myron Wolbarsht

1980-01-01T23:59:59.000Z

450

Circle Project  

E-Print Network [OSTI]

This project asks students to decide if a collection of points in space do or do not lie on a ... The project is accessible to linear algebra students who have studied...

451

Road less traveled vital to operational success  

SciTech Connect (OSTI)

PNNL's Monthly Economic Diversity column for the Tri-City Herald Business section. Excerpt follows: Things aren't always what they seem. Sometimes the path less traveled--although it can be exhausting if not scary to think about navigating its unknowns--really is the best way to go. And not just because Robert Frost said so. Patric Sazama, Regional Project Director for Impact Washington, would agree as well. He recently spoke to the Three Rivers Entrepreneur Network about achieving operational success by addressing the less tangible elements of an organization, the company's own less traveled path.

Madison, Alison L.

2012-01-08T23:59:59.000Z

452

Hydropower Projects  

Broader source: Energy.gov [DOE]

This report covers the Wind and Water Power Technologies Office's hydropower project funding from fiscal years 2008 to 2014.

453

Project 256  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

INNOVATIVE INSTRUMENTATION AND ANALYSIS INNOVATIVE INSTRUMENTATION AND ANALYSIS OF THE TEMPERATURE MEASUREMENT FOR GASIFICATION SYSTEMS Description The technical objective is to develop reliable and accurate instrumentation for temperature measurement in gasification systems by developing a thermocouple- based system with protective coating and self cleaning capabilities. The research will also show that the proposed instrumentation is a cost-effective temperature measurement technique for high temperature gasification through a reduction of the operation and maintenance cost. According to the DOE Gasification Database Results Updated 2001, all gasifiers in the United States have the capacity of 37,375 MW. It can be assumed that 10% of the power generated is estimated as the operation/maintenance cost. Of

454

Integrated project management plan for the Plutonium Finishing Plant stabilization and deactivation project  

SciTech Connect (OSTI)

This document sets forth the plans, organization, and control systems for managing the PFP Stabilization and Deactivation Project, and includes the top level cost and schedule baselines. The project includes the stabilization of Pu-bearing materials, storage, packaging, and transport of these and other nuclear materials, surveillance and maintenance of facilities and systems relied upon for storage of the materials, and transition of the facilities in the PFP Complex.

SINCLAIR, J.C.

1999-05-03T23:59:59.000Z

455

Road Transport Elasticity: How Fuel Price Changes can Affect Traffic Demand on a Toll Motorway  

Science Journals Connector (OSTI)

Abstract The crisis beginning in late 2008 in Greece, and still in progress, led the Greek Government to undertake a particularly harsh program under the joint auspices of the International Monetary Fund (IMF), the European Union and the European Central Bank, aimed at restoring the primary budget surplus. The implementation of such a financial program has dramatically increased fuel taxes - about 82% for unleaded and 31% for diesel also producing a serious impact on road traffic demand. Starting from the above framework, this paper describes the main outcomes of a study aimed at identifying, assessing and forecasting the effects of fuel prices and tax changes on traffic flows along a 365km toll motorway corridor project connecting Athens to Tsakona, in the South-West of the Peloponnese.

Antonio Musso; Cristiana Piccioni; Michele Tozzi; Gilles Godard; Alexandre Lapeyre; Kostas Papandreou

2013-01-01T23:59:59.000Z

456

Technical information report: Plasma melter operation, reliability, and maintenance analysis  

SciTech Connect (OSTI)

This document provides a technical report of operability, reliability, and maintenance of a plasma melter for low-level waste vitrification, in support of the Hanford Tank Waste Remediation System (TWRS) Low-Level Waste (LLW) Vitrification Program. A process description is provided that minimizes maintenance and downtime and includes material and energy balances, equipment sizes and arrangement, startup/operation/maintence/shutdown cycle descriptions, and basis for scale-up to a 200 metric ton/day production facility. Operational requirements are provided including utilities, feeds, labor, and maintenance. Equipment reliability estimates and maintenance requirements are provided which includes a list of failure modes, responses, and consequences.

Hendrickson, D.W. [ed.

1995-03-14T23:59:59.000Z

457

Optimal forest management for carbon sequestration and biodiversity maintenance.  

E-Print Network [OSTI]

??Managing planted forests for carbon sequestration and biodiversity maintenance has become increasingly important in times of rapid climate change and the loss of biodiversity worldwide. (more)

Nghiem, Thi Hong Nhung

2011-01-01T23:59:59.000Z

458

13 - Maintenance and repair of gas turbine components  

Science Journals Connector (OSTI)

Abstract: Material selection is a key factor in gas turbine performance and lifecycle cost because it has a central influence in the maintenance of the gas turbine.1 Further, the operation of a gas turbine does result in gas path degradation2 that impacts lifecycle costs and eventually design, manufacture, material choice and maintenance.3 A component repair programme that minimizes maintenance costs and maximizes equipment availability can be instituted to meet or improve lifecycle cost. This chapter presents the key factors influencing the need for maintenance and the choices available.

T. lvarez Tejedor; R. Singh; P. Pilidis

2013-01-01T23:59:59.000Z

459

Los Alamos Site Office Nuclear Maintenance Management Program...  

Office of Environmental Management (EM)

and Emergency Management Evaluations Activity Report for the Los Alamos Site Office Nuclear Maintenance Management Program Oversight Self-Assessment Dates of Activity : 1114...

460

Overview of the Second Quarter 2011 Surveillance and Maintenance...  

Office of Legacy Management (LM)

Maintenance and optimization of pilot air stripper No freezing observed Reduced solar availability reduced power available, causing pump to stop Resolved power issues...

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Y-12 demos former utilities and maintenance facility | National...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

demos former utilities and maintenance facility | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing...

462

ANNUAL MAINTENANCE AND LEAK TESTING FOR THE 9975 SHIPPING PACKAGE  

SciTech Connect (OSTI)

The purpose of this document is to provide step-by-step instructions for the annual helium leak test certification and maintenance of the 9975 Shipping Package.

Trapp, D.

2014-08-25T23:59:59.000Z

463

Market and Community in Antebellum America: The Plank Roads of New York  

E-Print Network [OSTI]

University 57.The map of Oneida County is part of the largeTERVILLE Plank Roads of Oneida County, NewYork, 1845-1860PLANK ROADS OF ONEIDA COUNTY, NEW YORK, 1845-1860 NO. I0 ii

Majewski, John; Baer, Christopher; Klein, Daniel B.

1991-01-01T23:59:59.000Z

464

The walled city : Beijing hybrid development plan in the 2nd ring road  

E-Print Network [OSTI]

The circular ring roads are one of the key elements that define the spatial organization of Beijing today. However, as the city continues to expand, the ring roads located in the inner city, combined with the gridded ...

Liang, Shaoyi

2014-01-01T23:59:59.000Z

465

E-Print Network 3.0 - air pollution ii--road Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ii--road Search Powered by Explorit Topic List Advanced Search Sample search results for: air pollution ii--road Page: << < 1 2 3 4 5 > >> 1 Air Pollution Physics and Chemistry EAS...

466

Floodplain and Wetlands Assessment for Construction of a Second Full Service Access Road over Lena Gulch  

Office of Energy Efficiency and Renewable Energy (EERE)

Floodplain and Wetlands Assessment for Construction of a Second Full Service Access Road over Lena Gulch from South Golden Road to the National Renewable Energy Laboratorys South Table Mountain Complex, Golden, Colorado.

467

Kursplan fr lsret 2001/2002 ROAD-MAN-LANDSCAPE -DESIGNPROJECT ASB150  

E-Print Network [OSTI]

, landscape and environmental requirements. Innehåll: Course content: New roads in the landscape. Conversion concepts in traffic planning, road construction, landscape architecture, urban architecture, planning (graduate) students of engineering, architecture and landscape architecture, and future planners

468

Gobble Up Fuel Savings on Your Next Road Trip with My Trip Calculator...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Gobble Up Fuel Savings on Your Next Road Trip with My Trip Calculator Gobble Up Fuel Savings on Your Next Road Trip with My Trip Calculator November 19, 2012 - 9:51am Addthis Save...

469

Pacific Northwest National Laboratory Grounds Maintenance  

Broader source: Energy.gov (indexed) [DOE]

Pacific Pacific Northwest National Laboratory (PNNL) operates an award-winning grounds maintenance program that comprises a comprehensive landscape and irrigation management program. The program has helped the laboratory reduce its water use for irrigation by 30%. PNNL is located in Richland, Washington, and is managed and operated by Battelle for the U.S. Department of Energy (DOE). PNNL scientists and engineers perform research on a variety of subjects, including energy and national security. PNNL has more than 4,200 staff members, sits on 600 acres, and houses 2 million square feet of facilities. The laboratory is located in an arid region of the state, receiving only eight inches of precipitation annually. It has more than 100 acres of turf and landscaped areas and

470

Sacramento Soleil Solar Project | Open Energy Information  

Open Energy Info (EERE)

Solar Project Solar Project Jump to: navigation, search Name Sacramento Soleil Solar Project Facility Sacramento Soleil Solar Project Sector Solar Facility Type Fixed Tilt Ground-Mount Owner EnXco Developer EnXco Energy Purchaser Sacramento Municipal Utility District (SMUD) Address 13345 Apple Road Location Wilton, CA Coordinates 38.449383°, -121.164657° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.449383,"lon":-121.164657,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

471

NETL: Oil & Natural Gas Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Using Artificial Barriers to Augment Fresh Water Supplies in Shallow Arctic Lakes Last Reviewed 6/26/2013 Using Artificial Barriers to Augment Fresh Water Supplies in Shallow Arctic Lakes Last Reviewed 6/26/2013 DE-NT0005684 Goal The goal of this project is to implement a snow control practice to enhance snow drift formation as a local water source to recharge a depleted lake despite possible unfavorable climate and hydrology preconditions (i.e., surface storage deficit and/or low precipitation). Performer University of Alaska Fairbanks, Fairbanks, AK Background Snow is central to activities in polar latitudes of Alaska over a very significant part of each year. With the arrival of snow, modes of travel, working, and living are transformed. Oil and gas exploration operations restricted to winter months use ice roads and ice pads in arctic and subarctic regions. The general reasoning behind ice road construction is

472

120 Check www.uaf.edu/schedule/ for changes to classes, regulations and fees. Area code is 907. FarmersLoopRoad  

E-Print Network [OSTI]

. TROTH YEDDHA' PARK FarmersLoopRoad West Valley Plaza 4001 Geist Road, Suite 6 - Advancement Services

Wagner, Diane

473

HCEI Road Map and Introduction and Overview 2011  

Office of Energy Efficiency and Renewable Energy (EERE)

This road map is a summary of the 2011 key goals and strategies of the Hawaii Clean Energy Initiative, which was founded based on a Memorandum of Understanding between the State of Hawaii and the U.S. Department of Energy in 2008.

474

An Investigation of Optimal Vehicle Maneuvers for Different Road Conditions  

E-Print Network [OSTI]

vehicle maneuvers in time-critical situations have emerged as powerful tools during the past years. EvenAn Investigation of Optimal Vehicle Maneuvers for Different Road Conditions Bj¨orn Olofsson Lund, Sweden, firstname.lastname@control.lth.se. Department of Electrical Engineering, Link

475

STAY TO THE RIGHT ON UNION STREET Roosevelt Road  

E-Print Network [OSTI]

STAY TO THE RIGHT ON UNION STREET Roosevelt Road NORTH HalstedStreet UnionAvenue Rochford Street Maxwell Street I-94DanRyanExpressway MXPS Maxwell Street Parking Structure X Stukel Towers (student onto W. Roosevelt Rd. Turn left at the first light onto S. Union Ave. From the North I-90 E

Illinois at Chicago, University of

476

Road Grade Estimation for Look-ahead Vehicle Control  

E-Print Network [OSTI]

to help meet the instantaneous power demand while keeping fuel consumption and environmental impact as low conserve fuel without increasing trip time. The preview road grade information can also be uti- lized when power comsumption scheduling over time can improve total energy efficiency, as explored in Pettersson

Johansson, Karl Henrik

477

Story Road Landfill Solar Site Evaluation: San Jose  

Broader source: Energy.gov [DOE]

This report describes the findings of a solar site evaluation conducted at the Story Road Landfill (Site) in the City of San Jose, California (City). This evaluation was conducted as part of a larger study to assess solar potential at multiple public facilities within the City.

478

The long and winding road of state building  

E-Print Network [OSTI]

Chapter 15 The long and winding road of state building Sagar Raj Sharma1 1. Context Post and services, including security. In this book, we have attempted to view state-building as essentially with various such aspects of state-building in today's post-conflict Nepal. The first two chapters have dealt

Richner, Heinz

479

On-Road Vehicle Detection Using Optical Sensors: A Review  

E-Print Network [OSTI]

1 On-Road Vehicle Detection Using Optical Sensors: A Review Zehang Sun1 , George Bebis2 and Ronald are expected to add up to 1%-3% of the world's gross domestic product [1]. With the aim of reducing injury

Bebis, George

480

Road traffic noise mapping in Guangzhou using GIS and GPS  

Science Journals Connector (OSTI)

Abstract The primary objective of this study is to develop day and night road traffic noise maps for Guangzhou using Geographical Information Systems (GIS) and Global Positioning Systems (GPS). First, as speed-density relation is used to estimate the traffic volume from GPS data collected from floating cars. Meanwhile, the attributes of the roads and buildings are automatically exported from GIS. Second, a single vehicle noise emission model is combined with a noise propagation model to formulate a regional traffic noise calculation model that accounts for the traffic noise attenuation in an urban area. The algorithm is optimized by intelligently dividing the computational grids, filtering the traffic noise sources automatically and performing a quick index of the estimation objects. Finally, the day and night road traffic noise levels in Guangzhou are estimated to create two traffic noise maps. The accuracy of the developed algorithm is validated by conducting a traffic noise monitoring experiment in several districts of Guangzhou with different road types. The results show that the average error between the estimated and measured values is below 2.0dB.

Ming Cai; Jingfang Zou; Jiemin Xie; Xialin Ma

2015-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Office of the General Counsel 777 Glades Road  

E-Print Network [OSTI]

Office of the General Counsel 777 Glades Road Boca Raton, FL 33431 tel: 561.297.3007 / fax: 561) communications intended to protect student, campus, or public safety. The Florida law is commonly interpreted be disclosed? Answer: In general, information derived from a student's education records may be disclosed only

Fernandez, Eduardo

482

FOR341 Timber Harvesting and Forest Roads Spring 2009  

E-Print Network [OSTI]

Text: Water Quality BMPs (Best Management Practices) for Montana Forests Other readings as assigned management. Best management practices as they apply to forest operations in Montana and the western US, cost effectiveness, and environmental performance of forest road systems. · Upper Division Writing

Vonessen, Nikolaus

483

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 6,  

E-Print Network [OSTI]

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 6, January 2007 Gary A 80208 June 2007 #12;On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 6 1-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 6 2 INTRODUCTION Many cities

Denver, University of

484

On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 2  

E-Print Network [OSTI]

On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 2 Sajal S. Pokharel, Gary Alpharetta, Georgia 30022 Contract No. E-23-4 #12;On-Road Remote Sensing of Automobile Emissions when the measurements were binned by model year. #12;On-Road Remote Sensing of Automobile Emissions

Denver, University of

485

On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 5,  

E-Print Network [OSTI]

On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 5, November 2004 Gary A, Suite 140 Alpharetta, Georgia 30022 Contract No. E-23-9 #12;On-Road Remote Sensing of Automobile campaigns.14 #12;On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 5 2 INTRODUCTION

Denver, University of

486

On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 3  

E-Print Network [OSTI]

On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 3 Sajal S. Pokharel, Gary Alpharetta, Georgia 30022 Contract No. E-23-4 #12;On-Road Remote Sensing of Automobile Emissions a slight negative dependence on #12;On-Road Remote Sensing of Automobile Emissions in the Phoenix Area

Denver, University of

487

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 5,  

E-Print Network [OSTI]

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 5, January 2005 Gary A, Suite 140 Alpharetta, Georgia 30022 Contract No. E-23-9 #12;On-Road Remote Sensing of Automobile campaigns.13 #12;On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 5 2 INTRODUCTION

Denver, University of

488

On-Road Remote Sensing of Automobile Emissions in the LaBrea Area: Year 2  

E-Print Network [OSTI]

On-Road Remote Sensing of Automobile Emissions in the LaBrea Area: Year 2 Mitchell J. Williams 140 Alpharetta, Georgia 30022 Contract No. E-23-4 #12;On-Road Remote Sensing of Automobile Emissions compared to the standard error of the mean measurements. #12;On-Road Remote Sensing of Automobile Emissions

Denver, University of

489

Pollutant Emissions from Biodiesels in Diesel Engine Tests and On-road Tests  

E-Print Network [OSTI]

-road biodiesel truck tests and data analysis were developed. Both road condition and engine performance affected the formation of emissions. Vehicle specific power (VSP) was calculated to present real power required in on-road tests. Tests data of highways showed...

Zhong, Yue

2012-08-31T23:59:59.000Z

490

An overview of recycling in road infrastructure in France from the OFRIR Jullien Agnsa  

E-Print Network [OSTI]

in road framework in France since 1980, considering both environmental, geotechnical road building (Ministry of Transport and Construction/Scientifical office and Road direction), by MEDD/DPPR (Ministry of environment and sustainable development/ Pollution and risk direction), by ADEME (Energy and Environment

Boyer, Edmond

491

Going-to-the-Sun Road, Glacier National Park, MT, USA  

E-Print Network [OSTI]

Going-to-the-Sun Road, Glacier National Park, MT, USA Avalanche Path Atlas Erich H. Peitzsch Daniel..................................................................................................................................... 2 Overview of Red Rock Group avalanche paths, Going-to-the-Sun Road, Glacier National Park, MT................................................................................................................................................... 3 Overview of Lower GTSR group avalanche paths, Going-to-the-Sun Road, Glacier National Park, MT

492

Department of Industrial & Manufacturing Engineering Fall 2011 Mining Media Handling Project  

E-Print Network [OSTI]

Project Overview Metso wants to develop a media handling solution (machinery and/or process) to enhance that optimizes media discharge, recharge and liner maintenance procedures in accordance with the handling system

Demirel, Melik C.

493

The effects of the implementation of grey water reuse systems on construction cost and project schedule  

E-Print Network [OSTI]

a positive or negative effect on the design teams decision to implement a grey water reuse system: capital cost, maintenance cost, LEED credits, local plumbing codes, project schedule, local water conservation issues, complexity of the system, etc...

Kaduvinal Varghese, Jeslin

2009-05-15T23:59:59.000Z

494

Long Length Contaminated Equipment Retrieval System Receiver Trailer and Transport Trailer Operations and Maintenance Manual  

SciTech Connect (OSTI)

A system to accommodate the removal of long-length contaminated equipment (LLCE) from Hanford underground radioactive waste storage tanks was designed, procured, and demonstrated, via a project activity during the 1990s. The system is the Long Length Contaminated Equipment Removal System (LLCERS). LLCERS will be maintained and operated by Tank Farms Engineering and Operations organizations and other varied projects having a need for the system. The responsibility for the operation and maintenance of the LLCERS Receiver Trailer (RT) and Transport Trailer (TT) resides with the RPP Characterization Project Operations organization. The purpose of this document is to provide vendor supplied operating and maintenance (O & M) information for the RT and TT in a readily retrievable form. This information is provided this way instead of in a vendor information (VI) file to maintain configuration control of the operations baseline as described in RPP-6085, ''Configuration Management Plan for Long Length Contaminated Equipment Receiver and Transport Trailers''. Additional Operations Baseline documents are identified in RPP-6085.

DALE, R.N.

2000-05-01T23:59:59.000Z

495

Modeling Web Maintenance Centers Through Queue Models M. Di Penta  

E-Print Network [OSTI]

Modeling Web Maintenance Centers Through Queue Models M. Di Penta , G. Casazza ¡ , G. Antoniol´eal Abstract The Internet and WEB pervasiveness are changing the landscape of several different areas ranging from infor- mation gathering/managing and commerce to software development, maintenance and evolution

Di Penta, Massimiliano

496

Printing Your Monthly PTA Maintenance Screen Shannon Monahan Page 1  

E-Print Network [OSTI]

Printing Your Monthly PTA Maintenance Screen Shannon Monahan Page 1 Office of Postdoctoral Maintenance Screen. All starting points begin before the popup menu comes up. In Internet Explorer the Orientation to Landscape, and click OK. Print as needed to either your printer or to Adobe PDF (only works

Kay, Mark A.

497

Risk-based Multiobjective Optimization Model for Bridge Maintenance Planning  

SciTech Connect (OSTI)

Determining the optimal maintenance plan is essential for successful bridge management. The optimization objectives are defined in the forms of minimizing life-cycle cost and maximizing performance indicators. Previous bridge maintenance models assumed the process of bridge deterioration and the estimate of maintenance cost are deterministic, i.e., known with certainty. This assumption, however, is invalid especially with estimates over a long time horizon of bridge life. In this study, we consider the risks associated with bridge deterioration and maintenance cost in determining the optimal maintenance plan. The decisions variables include the strategic choice of essential maintenance (such as silane treatment and cathodic protection), and the intervals between periodic maintenance. A epsilon-constrained Particle Swarm Optimization algorithm is used to approximate the tradeoff between life-cycle cost and performance indicators. During stochastic search for optimal solutions, Monte-Carlo simulation is used to evaluate the impact of risks on the objective values, at an acceptance level of reliability. The proposed model can facilitate decision makers to select the compromised maintenance plan with a group of alternative choices, each of which leads to a different level of performance and life-cycle cost. A numerical example is used to illustrate the proposed model.

Yang, I-T. [Associate Professor, National Taiwan University of Science and Technology (China); Hsu, Y.-S.

2010-05-21T23:59:59.000Z

498

`ODDS ALGORITHM'-BASED OPPORTUNISTIC MAINTENANCE FOR PRESERVING COMPONENT PERFORMANCES  

E-Print Network [OSTI]

into account a `lifecycle management'-oriented approach (Takata, et al., 2004). Indeed, limits on resources, at the manufacturing stage, an innovative culture wherein maintenance activities become of equal importance to actual planning and the production strategy planning to develop opportunistic maintenance tasks guaranteeing

Boyer, Edmond

499

Heavy Machine Failure Maintenance Stratege Study Based on FMEA  

Science Journals Connector (OSTI)

Heavy machine is mainly used for large-scale, large parts of the processing, is the country's headed guard equipment. Heavy machine's non-normal shutdown will result in significant damage to the enterprise, how to effectively improve the maintenance ... Keywords: Heavy machine, FMEA, Maintenance Strategy

Deng Chao; Xiong Yao; Yuan-hang Wang; Wu Jun

2010-06-01T23:59:59.000Z

500

Reliability-Based Prioritizing Maintenance Policy for Distribution System  

Science Journals Connector (OSTI)

This paper presents an approach to prioritize maintenance tasks in power distribution system based on reliability models. This approach define weighted average system reliability index WASRI employing reliability indices SAIFI, SAIDI, MAIFI and interruption ... Keywords: Maintenance management, distribution reliability, reliability indices

Zhang Yong; Sun Xiaorong; Chen Hao; Fangxing Li

2010-06-01T23:59:59.000Z