1

Optimal Resurfacing Decisions for Road Maintenance: A POMDP Perspective  

E-Print Network [OSTI]

. Numerical examples have shown that our model provides a preventive maintenance policy that slows downOptimal Resurfacing Decisions for Road Maintenance: A POMDP Perspective Mariem Zouch, Thomas Yeung / IRCCyN, F-44307 NANTES Cedex, France Keywords: Road deterioration, maintenance optimization, Partially

Boyer, Edmond

2

Project Profile: Innovative Application of Maintenance-Free Phase...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Innovative Application of Maintenance-Free Phase-Change Thermal Energy Storage for Dish Systems Project Profile: Innovative Application of Maintenance-Free Phase-Change Thermal...

3

MANAGING THE NATIONAL ROAD NETWORK MAINTENANCE IN SPAIN Vctor Gmez Fras  

E-Print Network [OSTI]

MANAGING THE NATIONAL ROAD NETWORK MAINTENANCE IN SPAIN Víctor Gómez Frías GETINSA (Spain), vgomez@getinsa.es Teresa Sánchez Chaparro ANECA (Spain), tsanchez@aneca.es ABSTRACT The Spanish Ministry of Public Works point of view. In order to understand the importance and difficulty that presents in Spain

Paris-Sud XI, Université de

4

Hampton Roads Demonstration Project | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's Heat Jump to:Photon Place:Net JumpStrategy |Hammerfest Strom UK co ownedRoads

5

Project Information Form Project Title Reduction of Lifecycle Green House Gas Emissions From Road  

E-Print Network [OSTI]

Project Information Form Project Title Reduction of Lifecycle Green House Gas Emissions From Road@ucdavis.edu Funding Source(s) and Amounts Provided (by each agency or organization) US DOT $30,000 Total Project Cost Brief Description of Research Project This white paper will summarize the state of knowledge and state

California at Davis, University of

6

Project Project Funding Operational & Maintenance Costs Univ. Project Title GSF Brief Description of Project Location Amount Source  

E-Print Network [OSTI]

Estimated Annual Amount For Amount Source STATE UNIVERSITY SYSTEM 2012-2013 Fixed Capital Outlay ProjectsProject Project Funding Operational & Maintenance Costs Univ. Project Title GSF Brief Description that will respond to the latest trends in small-group learning, technology resources, and collaboration spaces

Slatton, Clint

7

CRAD, Maintenance- Idaho Accelerated Retrieval Project Phase II  

Broader source: Energy.gov [DOE]

A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Maintenance program at the Idaho Accelerated Retrieval Project Phase II.

8

Microsoft Word - CX-Satsop-Aberdeen roads FY10_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

30, 2010 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Jim Semrau Project Manager - TELF-TPP-3 Proposed Action: Maintenance of access roads serving the...

9

ExxonMobil Olefins Plant Projects, Maintenance and Optimizations  

E-Print Network [OSTI]

are endothermic and there are drastic differences in temperature and pressure across the process Quench & Heat Recovery Steam Cracker Furnace Compression Refrigeration Fractionation Cracked Products ProductsFeed Fuel 60% 35% 5% Ethylene Plant Energy Consumption...ExxonMobil Olefins Plant Projects, Maintenance and Optimizations Matt Neely Utilities Coordinator ExxonMobil Baytown Olefins Plant 2014 IETC May 21, 2014 ESL-IE-14-05-02 Proceedings of the Thrity-Sixth Industrial Energy Technology Conference New...

Neely, M. M.

2014-01-01T23:59:59.000Z

10

Boyer-Tillamook Access Road Improvement Project 1 Finding of...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

dangerous. In addition, improvements to access road stream crossings would facilitate fish passage. Construction is expected to last from 2 to 4 months, although work may need to...

11

Project Profile: Maintenance-Free Stirling Engine for High-Performance...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Maintenance-Free Stirling Engine for High-Performance Dish CSP Project Profile: Maintenance-Free Stirling Engine for High-Performance Dish CSP Image of a prototype 30-kW Stirling...

12

Data collection, storage and integration requirements torealistically assess State road maintenance needs  

E-Print Network [OSTI]

Management Information System (MMIS), Salary and Labor Distribution System (SLD), Equipment Operating System (EOS), and Material Supply Management System (MSMS). The Single Entry Screen System (SES) was developed to allow input of data related to a... databases. These databases can be grouped according to their functions into: Maintenance Related Databases (MMS, SLD, EOS, MSMS) Pavement Related Databases (TRM, RIS, RIA, PMIS, RLSE) Bridge Related Databases (BRINSAP) 10 Construction related databases...

Prodhuturi, Venkat R.

1997-01-01T23:59:59.000Z

13

EA-1941: Boyer-Tillamook Access Road Improvement Project, Tillamook and Yamhill Counties, Oregon  

Broader source: Energy.gov [DOE]

BPA prepared an EA, FONSI, and Mitigation Action Plan to assess the potential environmental impacts of proposed improvements to 13 miles of access roads for its existing 115-kV Boyer-Tillamook No. 1 Transmission Line in Tillamook and Yamhill counties, Oregon. Associated activities would include resurfacing roads, adding drainage, widening 3 miles of road, constructing 0.1 mile of new road, maintaining culverts, and constructing outlet ditches and retaining walls. In addition, new bridges would be built, and culverts that currently block fish passage for anadromous and resident fish would be replaced. Additional information is available at the project website: http://efw.bpa.gov/environmental_services/Document_Library/Boyer-Tillamook/.

14

Archaeological investigations on the Buckboard Mesa Road Project  

SciTech Connect (OSTI)

In 1986, the Desert Research Institute (DRI) conducted an archaeological reconnaissance of a new alignment for the Buckboard Mesa Road on the Nevada Test Site for the Department of Energy (DOE). During this reconnaissance, several archaeological sites of National Register quality were discovered and recorded including a large quarry, site 26Ny4892, and a smaller lithic scatter, site 26Ny4894. Analysis of the debitage at 26Ny4892 indicates that this area was used primarily as a quarry for relatively small cobbles of obsidian found in the alluvium. Lithic reduction techniques used here are designed for efficiently reducing small pieces of toolstone and are oriented towards producing flake blanks from small cores and bifacially reducing exhausted cores. Projectile point cross references indicate that the area has seen at least casual use for about 10,000 years and more sustained use for the last 3,000 years. Initial obsidian hydration measurements indicate sustained use of the quarry for about the last 3,000 years although the loci of activities appear to change over time. Based on this study, the DRI recommends that quarrying activities in the area of 26Ny4892 are sufficiently sampled and that additional investigations into that aspect of prehistoric activity in the area are not necessary. This does not apply to other aspects of prehistoric use. DRI recommends that preconstruction surveys continue to identify nonquarrying, prehistoric utilization of the area. With the increased traffic on the Buckboard Mesa Road, there is a greater potential for vandalism to sites of National Register-quality located near the road. The DRI recommends that during the orientation briefing the workers at the Test Site be educated about the importance of cultural resources and the need for their protection. 202 refs., 41 figs., 52 tabs.

Amick, D.S.; Henton, G.H.; Pippin, L.C.

1991-10-01T23:59:59.000Z

15

Politics, Public Opinion, and Project Design in California Road Pricing  

E-Print Network [OSTI]

Unpublished Data) 13. Beal, Dan. Managing Director, Publicthe project is debated. Dan Beal (13) of the Automobile Clubagainst lifeline pricing. Beal (13) asserts that the

Smirti, Megan; Evans, Alexandra; Gougherty, Michael; Morris, Eric

2007-01-01T23:59:59.000Z

16

AWEA Wind Project Operations and Maintenance and Safety Seminar  

Office of Energy Efficiency and Renewable Energy (EERE)

The AWEA Wind Project O&M and Safety Seminar is designed for owners, operators, turbine manufactures, material suppliers, wind technicians, managers, supervisors, engineers, and occupational...

17

EA-1982: Parker-Davis Transmission System Routine Operation and Maintenance Project and Proposed Integrated Vegetation Management Plan  

Broader source: Energy.gov [DOE]

Western Area Power Administration (Western) is preparing an EA to assess potential environmental impacts of the proposed continuation of operations and maintenance activities and implementation of a vegetation management program on Westerns Parker-Davis Transmission System. These actions would occur on existing transmission line and access road rights-of-way, and at substations and maintenance facilities associated with the transmission system.

18

Microsoft Word - CX-CentraliaAreaAccessRoadsFY13_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

Darin Bowman Project Manager TELF-TPP-3 Proposed Action: Access Road maintenance on the Chehalis-Centralia No. 1, Chehalis-Covington No. 1, Paul-Allston No. 2, and Paul-Napavine...

19

Expert Meeting Report: Key Innovations for Adding Energy Efficiency to Maintenance Projects  

SciTech Connect (OSTI)

This report describes an expert meeting hosted by the Building America research team NAHB Research Center, which was held on February 8, 2012, in Orlando, Florida. The topic, Key Innovations for Adding Energy Efficiency to Maintenance Projects, was intended to provide direction to more focused efforts to increase the efficiency of existing homes; in this meeting, the focus was specifically for re-roofing and the opportunities for adding energy efficiency upgrades during this major home repair activity.

Wood, A.; Wiehagen, J.

2012-09-01T23:59:59.000Z

20

Project Description In the search for superior batteries, the road to success is paved with advanced materials: better  

E-Print Network [OSTI]

Project Description In the search for superior batteries, the road to success is paved with advanced materials: better cathodes, better anodes, better electrolytes. The universe of candidates is so of this proposal is that by leveraging the advances in informatics and high-throughput experimental

Sadoway, Donald Robert

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Development of a Pavement Maintenance and Rehabilitation Project Formation and Prioritization Methodology that Reflects Agency Priorities and Improves Network Condition  

E-Print Network [OSTI]

crucial step in pavement management is the formation and prioritization of maintenance and rehabilitation (M&R) projects that compete for limited funding for inclusion in the agencys multiyear pavement management plan (PMPs). In general, many highway...

Narciso, Paul John Ross

2013-07-22T23:59:59.000Z

22

Nez Perce Tribal Hatchery Project; Operations and Maintenance and Planning and Design, 2002 Annual Report.  

SciTech Connect (OSTI)

This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2002 annual report combines information from two contracts with a combined value of $3,036,014. Bonneville Power Administration identifies them as follows; (1) Part I--Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and $2,682,635 which includes--Equipment costs of $1,807,105. (2) Part II--Planning and Design--Project No. 1983-35-04, Contract No. 4035, $352,379 for Clearwater Coho Restoration Master Plan development Based on NPPC authorization for construction and operation of NPTH, the annual contracts were negotiated for the amounts shown above under (1) and (2). Construction contracts were handled by BPA until all facilities are completed and accepted.

Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

2005-12-01T23:59:59.000Z

23

A proposal to improve ecological compensation practice in road and railway projects in Spain  

SciTech Connect (OSTI)

To reduce ecological impacts caused by development projects, avoidance, minimization and compensation techniques have to be taken together into consideration along Environmental Impact Assessment (EIA) procedures. This paper explores the particular role that ecological compensation has had in recent road and railway EIA procedures in Spain, as seen through the review of a set of recent EIA Records of Decision (RODs) that confirms precedent findings. Noticing that residual impacts are not paid much attention, and that there is no evidence of a solid public participation in ecological impact evaluation, it proposes to increase the awareness on residual impacts, as a way to make easier public access to the allegedly most sensitive moment of EIA implementation: (residual) impact evaluation. -- Highlights: ? Ecological compensation practice in Spain is much lower than avoidance or mitigation. ? Residual impacts are overlooked in EIA processes and public participation is low. ? An increased awareness of residual impacts may also promote public participation. ? Current context needs these small steps to move towards better compensation practice.

Villarroya, Ana, E-mail: avillarroya@alumni.unav.es; Puig, Jordi, E-mail: jpbaguer@unav.es

2013-09-15T23:59:59.000Z

24

Step 4: Project Implementation Introduction to Step 5: Project Operations & Maintenance  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage » SearchEnergyDepartmentScopingOverviewFranklinStatusJ.R. Simplot4: Project5:

25

Transportation cask decontamination and maintenance at the potential Yucca Mountain repository; Yucca Mountain Site characterization project  

SciTech Connect (OSTI)

This study investigates spent fuel cask handling experience at existing nuclear facilities to determine appropriate cask decontamination and maintenance operations at the potential Yucca Mountain repository. These operations are categorized as either routine or nonroutine. Routine cask decontamination and maintenance tasks are performed in the cask preparation area at the repository. Casks are taken offline to a separate cask maintenance area for major nonroutine tasks. The study develops conceptual designs of the cask preparation area and cask maintenance area. The functions, layouts, and major features of these areas are also described.

Hartman, D.J.; Miller, D.D. [Bechtel National, Inc., San Francisco, CA (United States); Hill, R.R. [Sandia National Labs., Albuquerque, NM (United States)

1992-04-01T23:59:59.000Z

26

Two Innovative Steps for Training on Maintenance: 'VIRMAN' Spanish Project based on Virtual Reality 'STARMATE' European Project based on Augmented Reality  

SciTech Connect (OSTI)

This paper presents two development projects (STARMATE and VIRMAN) focused on supporting training on maintenance. Both projects aim at specifying, designing, developing, and demonstrating prototypes allowing computer guided maintenance of complex mechanical elements using Augmented and Virtual Reality techniques. VIRMAN is a Spanish development project. The objective is to create a computer tool for maintenance training course elaborations and training delivery based on 3D virtual reality models of complex components. The training delivery includes 3D record displays on maintenance procedures with all complementary information for intervention understanding. Users are requested to perform the maintenance intervention trying to follow up the procedure. Users can be evaluated about the level of knowledge achieved. Instructors can check the evaluation records left during the training sessions. VIRMAN is simple software supported by a regular computer and can be used in an Internet framework. STARMATE is a forward step in the area of virtual reality. STARMATE is a European Commission project in the frame of 'Information Societies Technologies'. A consortium of five companies and one research institute shares their expertise in this new technology. STARMATE provides two main functionalities (1) user assistance for achieving assembly/de-assembly and following maintenance procedures, and (2) workforce training. The project relies on Augmented Reality techniques, which is a growing area in Virtual Reality research. The idea of Augmented Reality is to combine a real scene, viewed by the user, with a virtual scene, generated by a computer, augmenting the reality with additional information. The user interface is see-through goggles, headphones, microphone and an optical tracking system. All these devices are integrated in a helmet connected with two regular computers. The user has his hands free for performing the maintenance intervention and he can navigate in the virtual world thanks to a voice recognition system and a virtual pointing device. The maintenance work is guided with audio instructions, 2D and 3D information are directly displayed into the user's goggles: There is a position-tracking system that allows 3D virtual models to be displayed in the real counterpart positions independently of the user allocation. The user can create his own virtual environment, placing the information required wherever he wants. The STARMATE system is applicable to a large variety of real work situations. (author)

Gonzalez Anez, Francisco [Tecnatom s.a., Avda. Montes de Oca 1, 28709 San Sebastian de los Reyes, Madrid (Spain)

2002-07-01T23:59:59.000Z

27

Maintenance and operations contractor plan for transition to the project Hanford management contract (PHMC)  

SciTech Connect (OSTI)

This plan has been developed by Westinghouse Hanford Company (WHC), and its subcontractors ICF Kaiser Hanford (ICF KH) and BCS Richland, Inc. (BCSR), at the direction of the US Department of Energy (DOE), Richland Operations Office (RL). WHC and its subcontractors are hereafter referred to as the Maintenance and Operations (M and O) Contractor. The plan identifies actions involving the M and O Contractor that are critical to (1) prepare for a smooth transition to the Project Hanford Management Contractor (PHMC), and (2) support and assist the PHMC and RL in achieving transition as planned, with no or minimal impact to ongoing baseline activities. The plan is structured around two primary phases. The first is the pre-award phase, which started in mid-February 1996 and is currently scheduled to be completed on June 1, 1996, at which time the contract is currently planned to be awarded. The second is the follow-on four-month post-award phase from June 1, 1996, until October 1, 1996. Considering the magnitude and complexity of the scope of work being transitioned, completion in four months will require significant effort by all parties. To better ensure success, the M and O Contractor has developed a pre-award phase that is intended to maximize readiness for transition. Priority is given to preparation for facility assessments and processing of personnel, as these areas are determined to be on the critical path for transition. In addition, the M and O Contractor will put emphasis during the pre-award phase to close out open items prior to contract award, to include grievances, employee concerns, audit findings, compliance issues, etc.

Waite, J.L.

1996-04-12T23:59:59.000Z

28

Electricity for road transport, flexible power systems and wind...  

Open Energy Info (EERE)

Electricity for road transport, flexible power systems and wind power (Smart Grid Project) Jump to: navigation, search Project Name Electricity for road transport, flexible power...

29

Stochastic Modeling of Future Highway Maintenance Costs for Flexible Type Highway Pavement Construction Projects  

E-Print Network [OSTI]

that affect pavement performances; 2) develop a stochastic model that predicts future maintenance costs of flexible-type pavement in Texas. The study data were gathered through the Pavement Management Information System (PMIS) containing more than 190...

Kim, Yoo Hyun

2012-07-16T23:59:59.000Z

30

Did you pave the road to project completion with gold, asphalt, or mud?  

SciTech Connect (OSTI)

The Simpson-Wilberg Technique for Expert Decision Tree Modeling (patent case number S-83,506) establishes and identifies the proper requirements governing effective business and operating practices through the use of knowledge-based engineering (KBE). The new application, Project Control Expert System (ProCon X) was created by the Simpson-Wilberg technique as a tool for project definition planning and control. ProCon X guides the project manager through an interview session asking project characteristic questions and establishes the proper project criteria. The criteria produced define the rigor applied to the project activities, i.e., level of work breakdown structure (WBS), type of scheduling, amount of cost estimating, etc. In this paper the use of the Simpson-Wilberg technique will be illustrated for solving the problems of identifying proper project criteria for project management. This technique has been used for other applications outside the project management field and can be used in any field with a need for consistent application of rules and procedures routinely used for business and operating practices.

Wilberg, M.; Simpson, W.

1994-12-31T23:59:59.000Z

31

Prototypical Rod Consolidation Demonstration Project. Phase 3, Final report: Volume 4, Operations and maintenance manual, Book 5  

SciTech Connect (OSTI)

The objective of Phase III of the Prototypical Rod Consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod Consolidation System as described in the NUS Phase II Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase III effort the system was tested on a component, subsystem, and system level. Volume IV provides the Operating and Maintenance Manual for the Prototypical Rod Consolidation System that was installed at the Cold Test Facility. This document, Book 5 of Volume IV, discusses: Corrective maintenance procedures; Calibration procedures; Surveillance procedures; Equipment changeover procedures; Decontamination procedures; Recovery procedures; and Cable schedule.

Not Available

1993-05-01T23:59:59.000Z

32

Prototypical Rod Consolidation Demonstration Project. Phase 3, Final report: Volume 4, Operations and maintenance manual, Book 4  

SciTech Connect (OSTI)

The objective of Phase III of the Prototypical Rod Consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod Consolidation System as described in the NUS Phase II Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase III effort the system was tested on a component, subsystem, and system level. Volume IV provides the Operating and Maintenance Manual for the Prototypical Rod Consolidation System that was installed at the Cold Test Facility. This document, Book 4 of Volume IV, discusses: Off-normal operating and recovery procedures; Emergency response procedures; Troubleshooting procedures; and Preventive maintenance procedures.

Not Available

1993-05-01T23:59:59.000Z

33

Rapid road repair vehicle  

DOE Patents [OSTI]

Disclosed is a rapid road repair vehicle capable of moving over a surface to be repaired at near normal posted traffic speeds to scan for and find an the high rate of speed, imperfections in the pavement surface, prepare the surface imperfection for repair by air pressure and vacuum cleaning, applying a correct amount of the correct patching material to effect the repair, smooth the resulting repaired surface, and catalog the location and quality of the repairs for maintenance records of the road surface. The rapid road repair vehicle can repair surface imperfections at lower cost, improved quality, at a higher rate of speed than was was heretofor possible, with significantly reduced exposure to safety and health hazards associated with this kind of road repair activities in the past.

Mara, Leo M. (Livermore, CA)

1998-01-01T23:59:59.000Z

34

Better haul roads speed operations  

SciTech Connect (OSTI)

Modern trucks and scrapers are manufactured to standards of increasingly larger size and degree of sophistication, and to get the greatest return in productivity it is necessary to have good haul roads. Good haul roads can reduce fuel consumption, increase vehicle speed, reduce wear and tear on machinery, and improve safety. The paper describes aspects of haul road maintenance, including levelling and repairing of the surface, reducing rolling resistance, super-elevating curves, eliminating reverse curves and controlling dust. The design of haul roads is also covered.

Not Available

1982-03-01T23:59:59.000Z

35

Kalispel Resident Fish Project- Kalispel Tribal Hatchery Operations and Maintenance, 1997 Annual Report.  

SciTech Connect (OSTI)

In 1996, construction activities commenced on a largemouth bass hatchery located on the Kalispel Indian Reservation. The major construction activities were complete as of October 1997. Of the six objectives identified in the 1997 Annual Operating Plan two objectives were fully achieved: the assembly of the life support system, and the preparation of the hatchery Operations and Maintenance Manual. The remaining four objectives were not fully achieved due to the hatchery not being completed before the spawning season (spring).

Kalispel Tribe, Department of Natural Resources

1998-01-01T23:59:59.000Z

36

Data Collection for Current U.S. Wind Energy Projects: Component Costs, Financing, Operations, and Maintenance; January 2011 - September 2011  

SciTech Connect (OSTI)

DNV Renewables (USA) Inc. (DNV) used an Operations and Maintenance (O&M) Cost Model to evaluate ten distinct cost scenarios encountered under variations in wind turbine component failure rates. The analysis considers: (1) a Reference Scenario using the default part failure rates within the O&M Cost Model, (2) High Failure Rate Scenarios that increase the failure rates of three major components (blades, gearboxes, and generators) individually, (3) 100% Replacement Scenarios that model full replacement of these components over a 20 year operating life, and (4) Serial Failure Scenarios that model full replacement of blades, gearboxes, and generators in years 4 to 6 of the wind project. DNV selected these scenarios to represent a broad range of possible operational experiences. Also in this report, DNV summarizes the predominant financing arrangements used to develop wind energy projects over the past several years and provides summary data on various financial metrics describing those arrangements.

Martin-Tretton, M.; Reha, M.; Drunsic, M.; Keim, M.

2012-01-01T23:59:59.000Z

37

Microsoft Word - CX-Ross-Lexington_access_road_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

Darin Bowman Project Manager - TELF-TPP-3 Proposed Action: Access road repair including reconstructing, grading, and shaping of roads, placing and compacting of rock surfacing,...

38

Mn/DOT County Road Safety Plans  

E-Print Network [OSTI]

Roads Program !! Minnesota Central Safety Funds !! Foster safety culture among county stakeholders 41 Mn/DOT County Road Safety Plans CTS Annual Research Conference April 27 & 28, 2010 Howard Preston & Objectives !! Project Overview !! Schedule, Participating Counties, Approach !! Safety Emphasis Areas

Minnesota, University of

39

Yakima/Klickitat Fisheries Project Phase II Fish Screen Operation and Maintenance; Washington Department of Fish and Wildlife, 2005-2006 Annual Report.  

SciTech Connect (OSTI)

The goal of this project is to assure that the benefits of BPA's capital investment in Yakima Basin Phase II fish screen facilities are realized by performing operations that assure optimal fish protection and long facility life through a rigorous preventative maintenance program, while helping to restore ESA listed fish stocks in the Yakima River Basin.

Schille, Patrick C. (Washington Department of Fish and Wildlife, Habitat Program, Yakima, WA)

2006-05-01T23:59:59.000Z

40

GENII (Generation II): The Hanford Environmental Radiation Dosimetry Software System: Volume 3, Code maintenance manual: Hanford Environmental Dosimetry Upgrade Project  

SciTech Connect (OSTI)

The Hanford Environmental Dosimetry Upgrade Project was undertaken to incorporate the internal dosimetry models recommended by the International Commission on Radiological Protection (ICRP) in updated versions of the environmental pathway analysis models used at Hanford. The resulting second generation of Hanford environmental dosimetry computer codes is compiled in the Hanford Environmental Dosimetry System (Generation II, or GENII). This coupled system of computer codes is intended for analysis of environmental contamination resulting from acute or chronic releases to, or initial contamination of, air, water, or soil, on through the calculation of radiation doses to individuals or populations. GENII is described in three volumes of documentation. This volume is a Code Maintenance Manual for the serious user, including code logic diagrams, global dictionary, worksheets to assist with hand calculations, and listings of the code and its associated data libraries. The first volume describes the theoretical considerations of the system. The second volume is a Users' Manual, providing code structure, users' instructions, required system configurations, and QA-related topics. 7 figs., 5 tabs.

Napier, B.A.; Peloquin, R.A.; Strenge, D.L.; Ramsdell, J.V.

1988-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Global Roads Global Roads Open Access Data Set, Version 1 (gROADSv1): South America  

E-Print Network [OSTI]

0 1,000 Km Global Roads Global Roads Open Access Data Set, Version 1 (gROADSv1): South America South America Lambert Conformal Conic Projection Data source: Center for International Earth Science

Columbia University

42

Small-scale hydroelectric power demonstration project: Broad River Electric Cooperative, Inc. , Cherokee Falls, South Carolina: Final operations and maintenance report  

SciTech Connect (OSTI)

The purpose of this report is to give a final accounting of the costs and benefits derived from the first two years of operation of the Cherokee Falls, Broad River Hydroelectric Demonstration Project which was built at Cherokee Falls, South Carolina. Prior to construction, Broad River Electric Cooperative, Inc. (BREC) executed a Cooperative Agreement with the US Department of Energy (DOE) Number FC07-80ID12125 which provided $1,052,664 toward the construction of the facility. This agreement requires that BREC document for DOE a summary of the complete operating statistics, operating and maintenance cost, and revenues from power sales for a two-year operating period. A complete reporting covering the design, technical, construction, legal, institutional, environmental and other related aspects of the total project was furnished to DOE previously for publication as the ''Final Technical and Construction Cost Report''. For this reason these elements will not be addressed in detail in this report. In order to make this account a more meaningful discussion of the initial two-year and four month production period, it is necessary to detail several unique events concerning the project which set Cherokee Falls apart from other projects developed under similar Cooperative Agreements with DOE. Accordingly, this report will discuss certain major problems experienced with the design, operation and maintenance, energy production, as well as the operation and maintenance cost and value of the power produced for the first 28 months of operation. 3 figs.

Not Available

1988-08-01T23:59:59.000Z

43

Murdoch University Dixon Road, Rockingham  

E-Print Network [OSTI]

Murdoch University Dixon Road, Rockingham Western Australia 6168 Email: info in Desalination Australia holds a diverse portfolio of 43 research projects, spanning five, and on microbial populations in seawater. Forward osmosis as a low energy and high efficiency pre

44

Virginia Natural Gas's Hampton Roads Pipeline Crossing  

Broader source: Energy.gov [DOE]

Presentationgiven at the Federal Utility Partnership Working Group (FUPWG) Fall 2008 meetingcovers Virginia Natural Gas's (VNG's) pipeline project at Hampton Roads Crossing (HRX).

45

Maintenance Types  

Broader source: Energy.gov [DOE]

Proper operations and maintenance (O&M) goes beyond repairing equipment after it breaks. Several maintenance strategies exist to prevent systems disrepair and degradation. A combination of the...

46

Distributed road assessment system  

DOE Patents [OSTI]

A system that detects damage on or below the surface of a paved structure or pavement is provided. A distributed road assessment system includes road assessment pods and a road assessment server. Each road assessment pod includes a ground-penetrating radar antenna array and a detection system that detects road damage from the return signals as the vehicle on which the pod is mounted travels down a road. Each road assessment pod transmits to the road assessment server occurrence information describing each occurrence of road damage that is newly detected on a current scan of a road. The road assessment server maintains a road damage database of occurrence information describing the previously detected occurrences of road damage. After the road assessment server receives occurrence information for newly detected occurrences of road damage for a portion of a road, the road assessment server determines which newly detected occurrences correspond to which previously detected occurrences of road damage.

Beer, N. Reginald; Paglieroni, David W

2014-03-25T23:59:59.000Z

47

Stalled on the Road to the Market: Analysis of Field Experience with a Project to Promote Lighting Efficiency in India  

E-Print Network [OSTI]

1991. "Energy-Efficient Lighting in Brazil and India:on Energy-Efficient Lighting. Stockholm, Sweden. Katzev,with a Project to Promote Lighting Efficiency in India AJ.

Gadgil, A.J.

2008-01-01T23:59:59.000Z

48

Reactive Maintenance  

Broader source: Energy.gov [DOE]

Reactive maintenance follows a run-it-until-it-breaks strategy where no actions or efforts are taken to maintain equipment as intended by the manufacturer. Studies indicate this is still the predominant mode of maintenance for Federal facilities.

49

Inspection & Maintenance  

E-Print Network [OSTI]

vehicles they own or control: 1. Preventative maintenance/safety inspections at least every 3 to 6 months provides a Preventive Maintenance Check List for guidance and scheduling. 2. If a vehicle is under warranty, Fleet Services will ensure the vehicle has at least the normal preventative, scheduled maintenance

50

The ethanol heavy-duty truck fleet demonstration project  

SciTech Connect (OSTI)

This project was designed to test and demonstrate the use of a high- percentage ethanol-blended fuel in a fleet of heavy-duty, over-the- road trucks, paying particular attention to emissions, performance, and repair and maintenance costs. This project also represents the first public demonstration of the use of ethanol fuels as a viable alternative to conventional diesel fuel in heavy-duty engines.

NONE

1997-06-01T23:59:59.000Z

51

ASHLAND ROAD COLLEGE AVENUE  

E-Print Network [OSTI]

ASHLAND ROAD N COLLEGE AVENUE RESIDENCE HALLS ROLLINS GROUP RESIDENCE HALLS DOBBS GROUP RESIDENCE ASHLAND ROAD OUTERROAD COLLEGE AVENUE RESIDENCE HALLS ROLLINS GROUP RESIDENCE HALLS DOBBS GROUP RESIDENCE

Taylor, Jerry

52

Operations and maintenance philosophy  

SciTech Connect (OSTI)

This Operations and Maintenance (O&M) Philosophy document is intended to establish a future O&M vision, with an increased focus on minimizing worker exposure, ensuring uninterrupted retrieval operations, and minimizing operation life-cycle cost. It is intended that this document would incorporate O&M lessons learned into on-going and future project upgrades.

DUNCAN, G.P.

1999-10-28T23:59:59.000Z

53

Predictive Maintenance  

Broader source: Energy.gov [DOE]

Predictive maintenance aims to detect equipment degradation and address problems as they arise. The result indicates potential issues, which are controlled or eliminated prior to any significant system deterioration.

54

Preventive Maintenance  

Broader source: Energy.gov [DOE]

Preventive maintenance aims to sustain and/or extend system lifespan through a set of actions that detect, preclude, or mitigate system degradation. These actions are based on either calendar time or machine run time.

55

DATA SHARING REPORT CHARACTERIZATION OF THE SURVEILLANCE AND MAINTENANCE PROJECT MISCELLANEOUS PROCESS INVENTORY WASTE ITEMS OAK RIDGE NATIONAL LABORATORY, Oak Ridge TN  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) Oak Ridge Office of Environmental Management (EM-OR) requested Oak Ridge Associated Universities (ORAU), working under the Oak Ridge Institute for Science and Education (ORISE) contract, to provide technical and independent waste management planning support under the American Recovery and Reinvestment Act (ARRA). Specifically, DOE EM-OR requested ORAU to plan and implement a sampling and analysis campaign to target certain items associated with URS|CH2M Oak Ridge, LLC (UCOR) surveillance and maintenance (S&M) process inventory waste. Eight populations of historical and reoccurring S&M waste at the Oak Ridge National Laboratory (ORNL) have been identified in the Waste Handling Plan for Surveillance and Maintenance Activities at the Oak Ridge National Laboratory, DOE/OR/01-2565&D2 (WHP) (DOE 2012) for evaluation and processing for final disposal. This waste was generated during processing, surveillance, and maintenance activities associated with the facilities identified in the process knowledge (PK) provided in Appendix A. A list of items for sampling and analysis were generated from a subset of materials identified in the WHP populations (POPs) 4, 5, 6, 7, and 8, plus a small number of items not explicitly addressed by the WHP. Specifically, UCOR S&M project personnel identified 62 miscellaneous waste items that would require some level of evaluation to identify the appropriate pathway for disposal. These items are highly diverse, relative to origin; composition; physical description; contamination level; data requirements; and the presumed treatment, storage, and disposal facility (TSDF). Because of this diversity, ORAU developed a structured approach to address item-specific data requirements necessary for acceptance in a presumed TSDF that includes the Environmental Management Waste Management Facility (EMWMF)using the approved Waste Lot (WL) 108.1 profilethe Y-12 Sanitary Landfill (SLF) if appropriate; EnergySolutions Clive; and the Nevada National Security Site (NNSS) (ORAU 2013b). Finally, the evaluation of these wastes was more suited to a judgmental sampling approach rather than a statistical design, meaning data were collected for each individual item, thereby providing information for item-byitem disposition decisions. ORAU prepared a sampling and analysis plan (SAP) that outlined data collection strategies, methodologies, and analytical guidelines and requirements necessary for characterizing targeted items (ORAU 2013b). The SAP described an approach to collect samples that allowed evaluation as to whether or not the waste would be eligible for disposal at the EMWMF. If the waste was determined not to be eligible for EMWMF disposal, then there would be adequate information collected that would allow the waste to be profiled for one of the alternate TSDFs listed above.

Weaver, Phyllis C

2013-12-12T23:59:59.000Z

56

East Avenue Truck Inspection Patterson Pass Road Vasco Road  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Vasco Road Thunderbird Lane Greenville Road Greenville Road Directions to the SandiaCA - Visitor Badge Office Interstate 580 - OaklandSan Francisco, Traveling Eastbound * Exit...

57

Reliability-Centered Maintenance  

Broader source: Energy.gov [DOE]

Reliability-centered maintenance leverages the same practices and technologies of predictive maintenance.

58

Grande Ronde Endemic Spring Chinook Salmon Supplementation Project; Lostine River Operations and Maintenance 2004 Smolt Acclimation and Adult Return Report.  

SciTech Connect (OSTI)

The Nez Perce Tribe (NPT), through funding provided by the Bonneville Power Administration (BPA), has implemented a Chinook salmon supplementation program (250,000 smolts) on the Lostine River, a tributary to the Grande Ronde River of Oregon. The Grande Ronde Endemic Spring Chinook Salmon Supplementation project, which involves supplementation of the Upper Grande Ronde River and Catherine Creek in addition to the Lostine River, was established to prevent extirpation and increase the number of threatened Snake River spring/summer Chinook salmon (Oncorhynchus tshawytscha) returning to the Grande Ronde River. This report covers the eighth season (1997-2004) of adult Chinook salmon broodstock collection in the Lostine River and the sixth season (1999-2004) of acclimation of resulting Lostine River progeny. Production of Lostine River spring Chinook salmon smolts currently occurs at Lookingglass Fish Hatchery (LGH). The Lostine River supplementation program utilizes two strategies to obtain egg source for production of smolts for supplementation: captive broodstock and conventional broodstock. The captive broodstock strategy involves (1) capture of natural juvenile spring Chinook salmon smolts from the Lostine River, (2) rearing those to adult and spawning them, and (3) rearing the resultant progeny for eventual acclimation and release back into the Lostine River. The conventional broodstock strategy involves (1) capture of natural and hatchery origin adults returning to the Lostine River, (2) holding those adults and spawning them, and (3) rearing the resultant progency for acclimation and release back into the Lostine River. This report focuses on (1) the trapping and collection of adult spring Chinook salmon that return to the Lostine River, which provides the broodstock source for the conventional strategy and (2) the acclimation and release of juvenile spring Chinook salmon produced from the captive broodstock and conventional broodstock strategies. In 2004, acclimation of Lostine River spring Chinook salmon smolts occurred from March 1, 2004 through to April 14, 2004 and a total of 250,249 smolts were acclimated and released. These smolts were produced from the brood year (BY) 2002 egg source and included captive brood (133,781) and conventional (116,468) origin smolts that were all progeny of Lostine River spring Chinook salmon. Operation of the Lostine River adult monitoring and collection facility in 2004 began May 10, the first Chinook was captured on May 19, 2004 and the last Chinook was captured on September 16, 2004. The weir and trap were removed on October 1, 2004. A total of 1,091 adult Chinook, including jacks, were captured during the season. The composition of the run included 299 natural origin fish and 792 hatchery supplementation fish. There were no identified 'stray' hatchery fish from other programs trapped. Of the fish captured, 46 natural and 69 hatchery supplementation adults were retained for broodstock and transported to Lookingglass Hatchery for holding and spawning, 537 adult Chinook were passed or transported above the weir to spawn naturally, and 447 hatchery origin adult Chinook were transported and outplanted in the Wallowa River and Bear Creek to spawn in underseeded habitat. Of the 107 adults retained (eight additional hatchery females were collected and then later returned to the Lostine River to spawn naturally) for broodstock at Lookingglass Hatchery, 22 natural females and 30 supplementation females were represented in spawning. These females produced a total of 221,889 eggs at fertilization. Eye-up was 94.9% which yielded a total of 210,661 conventional program eyed eggs. The fecundity averaged 4,267 eggs per female. These eggs were incubated and at Lookingglass Hatchery until eyed stage and then transferred to Oxbow Hatchery where they will be reared to the fingerling stage. They will then be transported back to LGH and reared to the smolt stage and then transported to the Lostine acclimation facility for release in the spring of 2006. Captive brood program eggs/fish will be added to

Zollman, Richard L.; Eschler, Russell; Sealey, Shawn [Nez Perce Tribe

2009-03-31T23:59:59.000Z

59

Grande Ronde Endemic Spring Chinook Salmon Supplementation Project; Lostine River Operations and Maintenance 2003 Smolt Acclimation and Adult Return Report.  

SciTech Connect (OSTI)

The Nez Perce Tribe (NPT), through funding provided by the Bonneville Power Administration (BPA), has implemented a Chinook salmon supplementation program (250,000 smolts) on the Lostine River, a tributary to the Grande Ronde River of Oregon. The Grande Ronde Endemic Spring Chinook Salmon Supplementation project, which involves supplementation of the Upper Grande Ronde River and Catherine Creek in addition to the Lostine River, was established to prevent extirpation and increase the number of threatened Snake River spring/summer Chinook salmon (Oncorhynchus tshawytscha) returning to the Grande Ronde River. This report covers the seventh season (1997-2003) of adult Chinook salmon broodstock collection in the Lostine River and the fifth season (1999-2003) of acclimating the resultant progeny. Production of Lostine River spring Chinook salmon smolts currently occurs at Lookingglass Fish Hatchery (LGH). The Lostine River supplementation program utilizes two strategies to obtain egg source for production of smolts for supplementation: captive broodstock and conventional broodstock. The captive broodstock strategy involves (1) capture of natural juvenile spring Chinook salmon smolts from the Lostine River, (2) rearing those to adult and spawning them, and (3) rearing the resultant progeny for eventual acclimation and release back into the Lostine River. The conventional broodstock strategy involves (1) capture of natural and hatchery origin adults returning to the Lostine River, (2) holding those adults and spawning them, and (3) rearing the resultant progeny for acclimation and release back into the Lostine River. This report focuses on (1) the trapping and collection of adult spring Chinook salmon that return to the Lostine River, which provides the broodstock source for the conventional strategy and (2) the acclimation and release of juvenile spring Chinook salmon produced from the captive broodstock and conventional broodstock strategies. In 2003, acclimation of Lostine River spring Chinook salmon smolts occurred from March 3, 2003 through to April 14, 2003 and a total of 242,776 smolts were acclimated and released. These smolts were produced from the brood year (BY) 2001 egg source and included captive broodstock (141,860) and conventional broodstock (100,916) origin smolts that were all progeny of Lostine River spring Chinook salmon. Operation of the Lostine River adult monitoring and collection facility in 2003 began April 30th, the first Chinook was captured on May 16, 2003 and the last Chinook was captured on September 21, 2003. The weir and trap were removed on October 1, 2003. A total of 464 adult Chinook, including jacks, were captured during the season. The composition of the run included 239 natural origin fish and 225 hatchery supplementation fish. There were no identified 'stray' hatchery fish from other programs trapped. Of the fish captured, 45 natural and 4 hatchery supplementation adults were retained for broodstock and transported to LGH for holding and spawning, 366 adult Chinook were passed or transported above the weir to spawn naturally, and 49 hatchery origin adult jack Chinook were transported and outplanted in the Wallowa River and Bear Creek to spawn in underseeded habitat. Of the 49 adults retained for broodstock at Lookingglass Hatchery, 21 natural females and no hatchery origin females were represented in spawning. These females produced a total of 106,609 eggs at fertilization. Eye-up was 95.50% which yielded a total of 101,811 conventional program eyed eggs. The fecundity averaged 5,077 eggs per female. These eggs were incubated and at Lookingglass Hatchery until eyed stage. At eye they were transferred to Oxbow Hatchery where they were reared to the fingerling state at which time they were transported back to LGH until they were smolts in the spring of 2005. Captive brood program eggs/fish will be added to the conventional program eggs to make up the entire juvenile release for the Lostine River program in 2005.

Zollman, Richard L.; Eschler, Russell; Sealey, Shawn [Nez Perce Tribe

2009-03-31T23:59:59.000Z

60

Grande Ronde Endemic Spring Chinook Salmon Supplementation Project; Lostine River Operations and Maintenance 2007 Smolt Acclimation and Adult Return Report.  

SciTech Connect (OSTI)

The Nez Perce Tribe (NPT), through funding provided by the Bonneville Power Administration (BPA), has implemented a Chinook salmon supplementation program (250,000 smolts) on the Lostine River, a tributary to the Grande Ronde River of Oregon. The Grande Ronde Endemic Spring Chinook Salmon Supplementation project, which involves supplementation of the Upper Grande Ronde River and Catherine Creek in addition to the Lostine River, was established to prevent extirpation and increase the number of threatened Snake River spring/summer Chinook salmon (Oncorhynchus tshawytscha) returning to the Grande Ronde River. This report covers the eleventh season (1997-2007) of adult Chinook salmon broodstock collection in the Lostine River and the ninth season (1999-2007) of acclimation of resulting Lostine River progeny. Production of Lostine River spring Chinook salmon smolts currently occurs at Lookingglass Fish Hatchery (LGH). The Lostine River supplementation program utilizes two strategies to obtain egg source for production of smolts for supplementation: captive broodstock and conventional broodstock. The captive broodstock strategy involves (1) capture of natural juvenile spring Chinook salmon smolts from the Lostine River, (2) rearing those to adult and spawning them, and (3) rearing the resultant progeny for eventual acclimation and release back into the Lostine River. The conventional broodstock strategy involves (1) capture of natural and hatchery origin adults returning to the Lostine River, (2) holding those adults and spawning them, and (3) rearing the resultant progeny for acclimation and release back into the Lostine River. This report focuses on (1) the trapping and collection of adult spring Chinook salmon that return to the Lostine River, which provides the broodstock source for the conventional strategy and (2) the acclimation and release of juvenile spring Chinook salmon produced from the captive broodstock and conventional broodstock strategies In 2007, acclimation of Lostine River spring Chinook salmon smolts occurred from 3/5/07 through to 4/17/07 and a total of 230,010 smolts were acclimated and released. These smolts were produced from the brood year (BY) 2005 egg source and included captive brood (24,604) and conventional (205,406) origin smolts that were all progeny of Lostine River spring Chinook salmon. Operation of the Lostine River adult monitoring and collection facility in 2007 began May 14th. The first Chinook was captured on June 2, 2007 and the last Chinook was captured on September 25, 2007. The weir and trap were removed on October 1, 2007. A total of 637 adult Chinook, including jacks, were captured during the season. The composition of the run included 240 natural origin fish and 397 hatchery supplementation fish. There were no identified 'stray' hatchery fish from other programs trapped. Of the fish captured, 41 natural and 81 hatchery supplementation adults were retained for broodstock and transported to LGH for holding and spawning, 403 adult Chinook were passed or transported above the weir to spawn naturally, and only hatchery origin jack Chinook were transported and outplanted in the Wallowa River and Bear Creek in underseeded habitat. Of the 122 adult fish retained for broodstock, 20 natural females and 40 supplementation females were represented in spawning. The eggs from these females produced a total of 267,350 eggs at fertilization. Eye-up was 86.73% which yielded a total of 231,882 conventional program eyed eggs. The fecundity averaged 4,456 eggs per female. These eggs will be incubated and reared at Lookingglass Hatchery until they are smolts in the spring of 2009. Captive brood program eggs/fish will be added to the conventional program eggs to make up the entire juvenile release for the Lostine River program in 2009. Due to the success of the 2007 egg collection, the number of fish produced exceeded program needs and facility capabilities. As a result, there are plans to outplant fry in 2008 and parr in early 2009 to underseeded habitat in the Wallowa River.

Zollman, Richard L.; Eschler, Russell; Sealey, Shawn [Nez Perce Tribe

2009-03-31T23:59:59.000Z

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Grande Ronde Endemic Spring Chinook Salmon Supplementation Project; Lostine River Operations and Maintenance 2006 Smolt Acclimation and Adult Return Report.  

SciTech Connect (OSTI)

The Nez Perce Tribe (NPT), through funding provided by the Bonneville Power Administration (BPA), has implemented a Chinook salmon supplementation program (250,000 smolts) on the Lostine River, a tributary to the Grande Ronde River of Oregon. The Grande Ronde Endemic Spring Chinook Salmon Supplementation project, which involves supplementation of the Upper Grande Ronde River and Catherine Creek in addition to the Lostine River, was established to prevent extirpation and increase the number of threatened Snake River spring/summer Chinook salmon (Oncorhynchus tshawytscha) returning to the Grande Ronde River. This report covers the tenth season (1997-2006) of adult Chinook salmon broodstock collection in the Lostine River and the eighth season (1999-2006) of acclimation of resulting Lostine River progeny. Production of Lostine River spring Chinook salmon smolts currently occurs at Lookingglass Fish Hatchery (LGH). The Lostine River supplementation program utilizes two strategies to obtain egg source for production of smolts for supplementation: captive broodstock and conventional broodstock. The captive broodstock strategy involves (1) capture of natural juvenile spring Chinook salmon smolts from the Lostine River, (2) rearing those to adult and spawning them, and (3) rearing the resultant progeny for eventual acclimation and release back into the Lostine River. The conventional broodstock strategy involves (1) capture of natural and hatchery origin adults returning to the Lostine River, (2) holding those adults and spawning them, and (3) rearing the resultant progeny for acclimation and release back into the Lostine River. This report focuses on (1) the trapping and collection of adult spring Chinook salmon that return to the Lostine River, which provides the broodstock source for the conventional strategy and (2) the acclimation and release of juvenile spring Chinook salmon produced from the captive broodstock and conventional broodstock strategies In 2006, acclimation of Lostine River spring Chinook salmon smolts occurred from February 27, 2006 through to April 10, 2006 and a total of 240,568 smolts were acclimated and released. These smolts were produced from the brood year (BY) 2004 egg source and included captive brood (40,982) and conventional (199,586) origin smolts that were all progeny of Lostine River spring Chinook salmon. Operation of the Lostine River adult monitoring and collection facility in 2006 began May 15th, the first Chinook was captured on June 14, 2006 and the last Chinook was captured on September 27, 2006. The weir and trap were removed on October 1, 2006. A total of 534 adult Chinook, including jacks, were captured during the season. The composition of the run included 205 natural origin fish and 329 hatchery supplementation fish. There were no identified 'stray' hatchery fish from other programs trapped. Of the fish captured, 33 natural and 120 hatchery supplementation adults were retained for broodstock and transported to LGH for holding and spawning and 397 adult Chinook were passed or transported above the weir to spawn naturally. In 2006, no hatchery origin adult Chinook were transported and out planted in the Wallowa River and Bear Creek to spawn in under seeded habitat. In order to meet egg take goals for the conventional portion of the program, a determination was made that approximately 147 adults were needed for broodstock. As a result 16 (8 males and 8 females) of the 153 fish collected for broodstock were returned to the Lostine River to spawn naturally. Females that were spawned and provided the brood source were made up of 12 natural females and 45 supplementation females. One of these females tested positive for high levels of Bacterial Kidney Disease and consequently this females eggs were destroyed. The remaining females produced a total of 241,372 eggs at fertilization. Eye-up was 85.47% which yielded a total of 206,309 conventional program eyed eggs. The fecundity averaged 4,162 eggs per female. The brood year 2006 eggs will be incubated and reared at Lookingglass Hatchery until

Zollman, Richard L.; Eschler, Russell; Sealey, Shawn [Nez Perce Tribe

2009-03-31T23:59:59.000Z

62

A Road Accident  

E-Print Network [OSTI]

tracks (include description/relationship if appropriate) NA Title of track A Road Accident Translation of title Description (to be used in archive entry) Shel ko shares his experience of a serious road accident in which the truck he...

G.yu lha

63

Forest Roads (Minnesota)  

Broader source: Energy.gov [DOE]

Proposed forest roads must be approved and designated by the Commissioner of the Department of Natural Resources.

64

Scott Stadium Stadium Road  

E-Print Network [OSTI]

Scott Stadium Stadium Road Residence Hereford College Alderman Road Residence Area Aquatic Increase Service to the Corner I0 750 1,500375 Feet Coordinate System: NAD 1983 StatePlane Virginia South 2: 36.7667 Latitude Of Origin: 36.3333 Units: Foot US #12;Scott Stadium Stadium Road Residence

Acton, Scott

65

WP1 Climate services for road  

E-Print Network [OSTI]

WP1 Climate services for road authorities Janette Bessembinder et al. #12;2 A1: review, analysis and assessment of existing climate change projections regarding TEN-T needs A2: Development of a common methodology for the production of regional climate projections to provide consistent input data for risk

Haak, Hein

66

Finance forum.........................2 LTAP Roads Scholars.............3  

E-Print Network [OSTI]

· Finance forum.........................2 · LTAP Roads Scholars.............3 · CTS Executive on page 3 Value capture continued on page 2 Current funding and finance mechanisms for transportation face completed research project led by CTS. "The project provides new financing meth- ods that are not currently

Minnesota, University of

67

University Marketing Communications UMC Web Site Maintenance Service  

E-Print Network [OSTI]

University Marketing Communications UMC Web Site Maintenance Service Overview Content management and ongoing Web site maintenance is an essential part of any Web project plan. When developing a new Web site in Web maintenance activities. Benefits Our Web maintenance service gives you ongoing access to our group

Sibille, Etienne

68

Plant maintenance and advanced reactors issue, 2008  

SciTech Connect (OSTI)

The focus of the September-October issue is on plant maintenance and advanced reactors. Major articles/reports in this issue include: Technologies of national importance, by Tsutomu Ohkubo, Japan Atomic Energy Agency, Japan; Modeling and simulation advances brighten future nuclear power, by Hussein Khalil, Argonne National Laboratory, Energy and desalination projects, by Ratan Kumar Sinha, Bhabha Atomic Research Centre, India; A plant with simplified design, by John Higgins, GE Hitachi Nuclear Energy; A forward thinking design, by Ray Ganthner, AREVA; A passively safe design, by Ed Cummins, Westinghouse Electric Company; A market-ready design, by Ken Petrunik, Atomic Energy of Canada Limited, Canada; Generation IV Advanced Nuclear Energy Systems, by Jacques Bouchard, French Commissariat a l'Energie Atomique, France, and Ralph Bennett, Idaho National Laboratory; Innovative reactor designs, a report by IAEA, Vienna, Austria; Guidance for new vendors, by John Nakoski, U.S. Nuclear Regulatory Commission; Road map for future energy, by John Cleveland, International Atomic Energy Agency, Vienna, Austria; and, Vermont's largest source of electricity, by Tyler Lamberts, Entergy Nuclear Operations, Inc. The Industry Innovation article is titled Intelligent monitoring technology, by Chris Demars, Exelon Nuclear.

Agnihotri, Newal (ed.)

2009-09-15T23:59:59.000Z

69

Forest Road Building Regulations  

Broader source: Energy.gov [DOE]

The Wisconsin Department of Natural Resources has regulations for building a forest road, if development requires one. Regulations include zoning ordinances and permits for stream crossing, grading...

70

Home Maintenance Manual.  

E-Print Network [OSTI]

they become serious. The accompanying home maintenance plan is one way of setting up a regular inspection program. The checklist suggests maintenance and the best time to inspect. Revise or add to this checklist to meet your needs. HOME MAINTENANCE...

Anonymous,

1985-01-01T23:59:59.000Z

71

Insulators for cold urban areas: The problem of Road Salt Ravi Gorur and Sreeram Venkataraman  

E-Print Network [OSTI]

Insulators for cold urban areas: The problem of Road Salt Ravi Gorur and Sreeram Venkataraman of insulators in winter due to road salt. We have started a research project at Arizona State University are more concerned with the effect that the road salts have on insulators, both ceramic and composite

72

Optimal Highway Maintenance Policies under Uncertainty Bruno Castanier, Ph.D., Ecole des Mines de Nantes / IRCCyN  

E-Print Network [OSTI]

will extend the lifecycle of the road by performing preventive, conditioned-based maintenance to slow down the growth of cracks. Classical preventive maintenance policies usually shorten the lifecycle by forcingOptimal Highway Maintenance Policies under Uncertainty Bruno Castanier, Ph.D., Ecole des Mines de

Boyer, Edmond

73

Haul road dust control  

SciTech Connect (OSTI)

A field study was conducted to measure dust from haul trucks at a limestone quarry and a coal preparation plant waste hauling operation. The study found that primarily wind, distance and road treatment conditions notably affected the dust concentrations at locations next to, 50 ft from, and 100 ft away from the unpaved haulage road. Airborne dust measured along the unpaved haul road showed that high concentrations of fugitive dust can be generated with these concentrations rapidly decreasing to nearly background levels within 100 ft of the road. Instantaneous respirable dust measurements illustrated that the trucks generate a real-time dust cloud that has a peak concentration with a time-related decay rate as the dust moves past the sampling locations. The respirable dust concentrations and peak levels were notably diminished as the dust cloud was transported, diluted, and diffused by the wind over the 100 ft distance from the road. Individual truck concentrations and peak levels measured next to the dry road surface test section were quite variable and dependent on wind conditions, particularly wind direction, with respect to reaching the sampling location. The vast majority of the fugitive airborne dust generated from unpaved and untreated haulage roads was non-respirable. 6 figs.

Reed, W.R.; Organiscak, J.A. [NIOSH-PRL, Pittsburgh, PA (United States)

2007-10-15T23:59:59.000Z

74

A case model for predictive maintenance  

E-Print Network [OSTI]

This project is to respond to a need by Varian Semiconductor Equipment Associates, Inc. (VSEA) to help predict failure of ion implanters. Predictive maintenance would help to reduce the unscheduled downtime of ion implanters, ...

Li, Jiawei, M. Eng. Massachusetts Institute of Technology

2008-01-01T23:59:59.000Z

75

Optimizing Installation, Operation, and Maintenance at Offshore...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

wind industries, and significant first-hand knowledge of offshore installation, operation and maintenance (IO&M) activities. The aim of the GL GH study was to enable project...

76

Predictive Maintenance Technologies  

Broader source: Energy.gov [DOE]

Several diagnostic technologies and best practices are available to assist Federal agencies with predictive maintenance programs.

77

Microsoft Word - FINAL Contact Record 2012-01 Roads Maintenance  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofofOxford SiteToledo SiteTonawanda North - t8 OLFRockyRFLMA Contact

78

Tribal Renewable Energy Webinar on Project Implementation and...  

Broader source: Energy.gov (indexed) [DOE]

Renewable Energy Webinar on Project Implementation and Operations & Maintenance on Aug. 8 Tribal Renewable Energy Webinar on Project Implementation and Operations & Maintenance on...

79

Commencement Activities & Facility Maintenance Closures Updated Monday 4/29  

E-Print Network [OSTI]

· Fitness Center & Weight Room equipment cleaning, preventive maintenance, and layout changes #12;Commencement Activities & Facility Maintenance Closures Updated Monday 4/29 Spring Semester Normal Maintenance projects. · The Rec Center will be closed Monday 5/20 ­ Sunday 6/9. · The Rec Center reopens

von der Heydt, Rüdiger

80

DATA SHARING REPORT CHARACTERIZATION OF POPULATION 7: PERSONAL PROTECTIVE EQUIPMENT, DRY ACTIVE WASTE, AND MISCELLANEOUS DEBRIS, SURVEILLANCE AND MAINTENANCE PROJECT OAK RIDGE NATIONAL LABORATORY OAK RIDGE, TENNESSEE  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) Oak Ridge Office of Environmental Management (EM-OR) requested that Oak Ridge Associated Universities (ORAU), working under the Oak Ridge Institute for Science and Education (ORISE) contract, provide technical and independent waste management planning support under the American Recovery and Reinvestment Act (ARRA). Specifically, DOE EM-OR requested that ORAU plan and implement a sampling and analysis campaign targeting certain URS|CH2M Oak Ridge, LLC (UCOR) surveillance and maintenance (S&M) process inventory waste. Eight populations of historical and reoccurring S&M waste at the Oak Ridge National Laboratory (ORNL) have been identified in the Waste Handling Plan for Surveillance and Maintenance Activities at the Oak Ridge National Laboratory, DOE/OR/01-2565&D2 (WHP) (DOE 2012) for evaluation and processing to determine a final pathway for disposal. Population 7 (POP 7) consists of 56 containers of aged, low-level and potentially mixed S&M waste that has been staged in various locations around ORNL. Several of these POP 7 containers primarily contain personal protective equipment (PPE) and dry active waste (DAW), but may contain other miscellaneous debris. This data sharing report addresses the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) specified waste in a 13-container subpopulation (including eight steel boxes, three 55-gal drums, one sealand, and one intermodal) that lacked sufficient characterization data for possible disposal at the Environmental Management Waste Management Facility (EMWMF) using the approved Waste Lot (WL) 108.1 profile.

Harpenau, Evan M

2013-10-10T23:59:59.000Z

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Rapid road repair vehicle  

DOE Patents [OSTI]

Disclosed are improvments to a rapid road repair vehicle comprising an improved cleaning device arrangement, two dispensing arrays for filling defects more rapidly and efficiently, an array of pre-heaters to heat the road way surface in order to help the repair material better bond to the repaired surface, a means for detecting, measuring, and computing the number, location and volume of each of the detected surface imperfection, and a computer means schema for controlling the operation of the plurality of vehicle subsystems. The improved vehicle is, therefore, better able to perform its intended function of filling surface imperfections while moving over those surfaces at near normal traffic speeds.

Mara, Leo M. (Livermore, CA)

1999-01-01T23:59:59.000Z

82

Computerized Maintenance Management Systems  

Broader source: Energy.gov [DOE]

Computerized maintenance management systems (CMMS) are a type of management software that perform functions in support of operations and maintenance (O&M) programs. The software automates most of the logistical functions performed by O&M staff.

83

EA-1966: Sunflower Wind Project, Hebron, North Dakota  

Broader source: Energy.gov [DOE]

Western Area Power Administration (Western) prepared an EA to evaluate potential environmental impacts of interconnecting a proposed 80 MW generating facility south of Hebron in Morton and Stark Counties, North Dakota. The proposed wind generating facility of 30-50 wind turbines encompassed approximately 9,000 acres. Ancillary facilities included an underground collection line system, a project substation, one mile of new transmission line, a new switchyard facility on the existing Dickinson-Mandan 230 kV line owned and operated by Western, one permanent meteorological tower, new access roads, and an operations and maintenance building.

84

Designing a scrubber for maintenance  

SciTech Connect (OSTI)

Under Round 4 of the U.S. Department of Energy`s (DOE) Clean Coal Technology program, New York State Electric & Gas Corporation (NYSEG), in partnership with Saarberg-Holter-Umwelttechnik (SHU), Consolidation Coal Company and Stebbins Engineering and Manufacturing Company, has retrofitted a formic acid enhanced forced oxidation wet limestone scrubber on Units I and 2 at the Milliken Steam Electric Station. Units I and 2 are 1950s vintage Combustion Engineering tangentially fired pulverized coal units, which are rated at nominal 150 MW each and operate in balanced draft mode. The Flue Gas Desulfurization (FGD) system for Unit 2 was placed into operation in January 1995 and the Unit I system in June 1995. The project incorporates several unique aspects: low pH operation; a ceramic tile-lined cocurrent/countercurrent, split module absorber; a wet stack supported on the roof of the FGD building; and closed loop, zero liquid discharge operation that produces commercial grade gypsum and calcium chloride brine. The project objectives include 98% SO{sub 2} removal efficiency while burning high sulfur coal, the production of marketable byproducts to minimize solid waste disposal, zero wastewater discharge, space-saving design, and minimization of maintenance requirements of a wet scrubber. The paper provides a brief overview of the project scrubber design relating to maintenance considerations. A discussion of the early results of the maintenance history is also provided. Repair techniques that have been developed and tested for ceramic tile lined modules are included. 1 fig.

Mahlmeister, M.E.; Baron, E.S. [New York State Electric and Gas Corp., Binghamton, NY (United States); Watts, J. [USDOE Pittsburgh Energy Technology Center, PA (United States)

1996-12-01T23:59:59.000Z

85

Optimizing Preventive Maintenance Models  

E-Print Network [OSTI]

Optimizing Preventive Maintenance Models. Michael Bartholomew-Biggs. School of Physics Astronomy and Mathematics, University of Hertfordshire.

86

The Bumpy Road to Hydrogen  

E-Print Network [OSTI]

It appears to us that hydrogen is a highly promising option0616 The Bumpy Road to Hydrogen Daniel Sperling Joan OgdenThe Bumpy Road to Hydrogen 1 Daniel Sperling and Joan Ogden

Sperling, Dan; Ogden, Joan M

2006-01-01T23:59:59.000Z

87

New Construction Road Closures  

E-Print Network [OSTI]

New Construction Remodel Utility Road Closures 11 Keiss 12 Keiss 13 Stoddard 14 Stoddard Scott? Martha Coleman: 491-0101 Colorado State University - Fall 2013 Major Construction BRT Mason Corridor Facilitites Management Haberecht Haberecht Construction Work Zones 13 12 14 21 23 22 32 a #12;

88

Optimal Preventive Maintenance Under Decision Dependent Uncertainty  

SciTech Connect (OSTI)

We analyze a system of N components with dependent failure times. The goal is to obtain the optimal block replacement interval (different for each component) over a finite horizon that minimizes the expected total maintenance cost. In addition, we allow each preventive maintenance action to change the future joint failure time distribution. We illustrate our methodology with an example from South Texas Project Nuclear Operating Company. (authors)

Galenko, Alexander; Popova, Elmira [University of Texas at Austin, 1 University Station, Austin, Texas 78712 (United States); Kee, Ernie; Grantom, Rick [South Texas Project Nuclear Operating Company - STPNOC, P.O. Box 289, Wadsworth, Tx 77483 (United States)

2006-07-01T23:59:59.000Z

89

Campus Services 1951 East-West Road  

E-Print Network [OSTI]

parking customer, We want to provide you with some background on the proposed parking permit rate maintenance projects over several years. In the first year, the proposal will result in a permit rate increase new permit rates will be announced on our website and elsewhere; we invite you to attend and share

90

Duck Valley Reservoirs Fish Stocking and Operation and Maintenance, 2006-2007 Annual Progress Report.  

SciTech Connect (OSTI)

The Duck Valley Reservoirs Fish Stocking and Operations and Maintenance (DV Fisheries) project is an ongoing resident fish program that serves to partially mitigate the loss of anadromous fish that resulted from downstream construction of the hydropower system. The project's goals are to enhance subsistence fishing and educational opportunities for Tribal members of the Shoshone-Paiute Tribes and provide resident fishing opportunities for non-Tribal members. In addition to stocking rainbow trout (Oncorhynchus mykiss) in Mountain View, Lake Billy Shaw, and Sheep Creek Reservoirs, the program is also designed to maintain healthy aquatic conditions for fish growth and survival, to provide superior facilities with wilderness qualities to attract non-Tribal angler use, and to offer clear, consistent communication with the Tribal community about this project as well as outreach and education within the region and the local community. Tasks for this performance period are divided into operations and maintenance plus monitoring and evaluation. Operation and maintenance of the three reservoirs include fences, roads, dams and all reservoir structures, feeder canals, water troughs and stock ponds, educational signs, vehicles and equipment, and outhouses. Monitoring and evaluation activities included creel, gillnet, wildlife, and bird surveys, water quality and reservoir structures monitoring, native vegetation planting, photo point documentation, control of encroaching exotic vegetation, and community outreach and education. The three reservoirs are monitored in terms of water quality and fishery success. Sheep Creek Reservoir was very unproductive this year as a fishery. Fish morphometric and water quality data indicate that the turbidity is severely impacting trout survival. Lake Billy Shaw was very productive as a fishery and received good ratings from anglers. Mountain View was also productive and anglers reported a high number of quality sized fish. Water quality (specifically dissolved oxygen and temperature) is the main limiting factor in our fisheries.

Sellman, Jake; Dykstra, Tim [Shoshone-Paiute Tribes

2009-05-11T23:59:59.000Z

91

Review of maintenance personnel practices at nuclear power plants  

SciTech Connect (OSTI)

As part of the Nuclear Regulatory Commission (NRC) sponsored Maintenance Qualifications and Staffing Project, the Pacific Northwest Laboratory (PNL) has conducted a preliminary assessment of nuclear power plant (NPP) maintenance practices. As requested by the NRC, the following areas within the maintenance function were examined: personnel qualifications, maintenance training, overtime, shiftwork and staffing levels. The purpose of the assessment was to identify the primary safety-related problems that required further analysis before specific recommendations can be made on the regulations affecting NPP maintenance operations.

Chockie, A.D.; Badalamente, R.V.; Hostick, C.J.; Vickroy, S.C.; Bryant, J.L.; Imhoff, C.H.

1984-05-01T23:59:59.000Z

92

Centralized maintenance procedures  

SciTech Connect (OSTI)

In 1989, shortly after Westinghouse Hanford Company (WHC) assumed maintenance responsibilities for the Hanford site, a Department of Energy (DOE) maintenance audit found that field (working level) maintenance procedures and procedure practices of the facilities scattered across Hanford`s 560 square miles varied as greatly as the locations of those facilities. In some of the audited facilities there were few or no procedures; in others, procedures conflicted with or were redundant to procedures at other facilities. This document presents current efforts to centralize maintenance procedures.

Barber, J.R.

1994-02-01T23:59:59.000Z

93

HVAC Maintenance and Technologies  

Broader source: Energy.gov [DOE]

Presentation covers the HVAC maintenance and technologies, and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Providence, Rhode Island.

94

ADEC II Universal SCR Retrofit System for On-road and Off-road...  

Broader source: Energy.gov (indexed) [DOE]

ADEC II Universal SCR Retrofit System for On-road and Off-road Diesel Engines ADEC II Universal SCR Retrofit System for On-road and Off-road Diesel Engines Presentation given at...

95

Duck Valley Reservoirs Fish Stocking and Operation and Maintenance, 2005-2006 Annual Progress Report.  

SciTech Connect (OSTI)

The Duck Valley Reservoirs Fish Stocking and Operations and Maintenance (DV Fisheries) project is an ongoing resident fish program designed to enhance both subsistence fishing, educational opportunities for Tribal members of the Shoshone-Paiute Tribes, and recreational fishing facilities for non-Tribal members. In addition to stocking rainbow trout (Oncorhynchus mykiss) in Mountain View, Lake Billy Shaw, and Sheep Creek Reservoirs, the program also intends to afford and maintain healthy aquatic conditions for fish growth and survival, to provide superior facilities with wilderness qualities to attract non-Tribal angler use, and to offer clear, consistent communication with the Tribal community about this project as well as outreach and education within the region and the local community. Tasks for this performance period are divided into operations and maintenance plus monitoring and evaluation. Operation and maintenance of the three reservoirs include fences, roads, dams and all reservoir structures, feeder canals, water troughs and stock ponds, educational signs, vehicles and equipment, and outhouses. Monitoring and evaluation activities included creel, gillnet, wildlife, and bird surveys, water quality and reservoir structures monitoring, native vegetation planting, photo point documentation, control of encroaching exotic vegetation, and community outreach and education. The three reservoirs are monitored in terms of water quality and fishery success. Sheep Creek Reservoir was the least productive as a result of high turbidity levels and constraining water quality parameters. Lake Billy Shaw trout were in poorer condition than in previous years potentially as a result of water quality or other factors. Mountain View Reservoir trout exhibit the best health of the three reservoirs and was the only reservoir to receive constant flows of water.

Sellman, Jake; Dykstra, Tim [Shoshone-Paiute Tribes

2009-05-11T23:59:59.000Z

96

Road to Net Zero (Presentation)  

SciTech Connect (OSTI)

A PowerPoint presentation on NREL's Research Support Facility (RSF) and the road to achieving net zero energy for new construction.

Glover, B.

2011-05-01T23:59:59.000Z

97

Sally Johnson 123 Bakers Road  

E-Print Network [OSTI]

Sally Johnson 123 Bakers Road Nashville, TN 37212 203-333-4444 Sally.johnson@vanderbilt.edu Leslie. Sincerely, (signature) Sally Johnson #12;

Bordenstein, Seth

98

Johnson Creek Artificial Propagation and Enhancement Project Operations and Maintenance Program; Brood Year 2000: Johnson Creek Chinook Salmon Supplementation, Biennial Report 2000-2002.  

SciTech Connect (OSTI)

The Nez Perce Tribe, through funding provided by the Bonneville Power Administration, has implemented a small scale chinook salmon supplementation program on Johnson Creek, a tributary in the South Fork of the Salmon River, Idaho. The Johnson Creek Artificial Propagation Enhancement project was established to enhance the number of threatened Snake River summer chinook salmon (Oncorhynchus tshawytscha) returning to Johnson Creek through artificial propagation. Adult chinook salmon trapping, broodstock selection, and spawning was first implemented in 1998, did not occur in 1999, and was resumed in 2000. A total of 152 salmon were trapped in Johnson Creek in 2000, of which 73 (25 males, 16 females, and 32 jacks) fish were transported to Idaho Fish and Game=s South Fork Salmon River adult holding and spawning facility for artificial propagation purposes. The remaining 79 (29 males, 16 females, and 24 jacks) fish were released above the weir to spawn naturally. A total of 65,060 green eggs were taken from 16 female salmon and transported to the McCall Fish Hatchery for incubation and rearing. Egg counts indicated an average eye-up rate of 86.0% for 55,971 eyed eggs. Average fecundity for Johnson Creek females was 4,066 eggs per female. Juvenile fish were reared indoors at the McCall Fish Hatchery through November 2001. These fish were transferred to outdoor rearing facilities in December 2001 where they remained until release in March 2002. All of these fish were marked with Coded Wire Tags and Visual Implant Elastomer tags. In addition 9,987 were also PIT tagged. Hand counts provided by marking crews were used to amend the number of juvenile salmon released from the original egg count. A total of 57,392 smolts were released into a temporary acclimation channel in Johnson Creek on March 18, 19, 20, 2002. These fish were held in this facility until a fish screen was removed on March 22, 2002 and the fish were allowed to emigrate.

Daniel, Mitch; Gebhards, John; Hill, Robert

2003-05-01T23:59:59.000Z

99

Erosion at Decommissioned Road-Stream Crossings: Case Studies from Three  

E-Print Network [OSTI]

the dominant process and incorporate any lessons learned into future projects. Sites were also intentionally53 Erosion at Decommissioned Road-Stream Crossings: Case Studies from Three Northern California-treatment erosion was observed for 41 decommissioned road stream crossings in three northern California watersheds

Standiford, Richard B.

100

Microsoft Word - CX-Ross-Lexington_access_road_addition_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

gates, installation and maintenance of erosion control and water drainage features, and restoration of disturbed areas Budget Information: Work Order 00230995 PP&A Project No.:...

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Snow and Ice Control Best Management Practices Parking Lots, Sidewalks, Roads  

E-Print Network [OSTI]

Snow and Ice Control Best Management Practices Parking Lots, Sidewalks, Roads Minnesota Circuit opportunity to improve the way we manage snow and ice in Minnesota. By using snow and ice control best safer--while saving money and protecting water quality. Current Situation The snow and ice maintenance

Minnesota, University of

102

Operations and Maintenance Program Structure  

Broader source: Energy.gov [DOE]

The Federal Energy Management Program recommends Federal operations and maintenance (O&M) programs comprise of five distinct functions: operations, maintenance, engineering, training, and...

103

CRAD, Maintenance Assessment Plan  

Broader source: Energy.gov [DOE]

An effective facilities maintenance program should optimize the material condition of components and equipment to support safe and effective operations and ensure the peak performance and reliability of those systems and equipment important to operations.

104

Associate Vice Chancellor Maintenance  

E-Print Network [OSTI]

Engineering Capital Planning & Design Carpentry Shop Electrical Shop Plumbing Shop HVAC Shop Housing Shop Equipment & Vehicle Maintenance Warehouse Vehicle Pool Shuttle Post Office Parking Services Contract Management Water Distribution Heat & Power Generation Heat Distribution Power Distribution December 2012

Hartman, Chris

105

Seasonal Landscape Maintenance  

E-Print Network [OSTI]

Seasonal Landscape Maintenance Oklahoma State University, in compliance with Title VI and VII State University's Department of Horticulture and Landscape Architecture and Oklahoma Cooperative to dry between watering allows plants to develop stronger, deeper roots. However, some landscape plants

Balasundaram, Balabhaskar "Baski"

106

Road Map Team Proposal Form Proposal: P9  

E-Print Network [OSTI]

of state funding, but would be useful to the university and that align with its that may be conceived and require university funding. A process for winnowing University-wide and school/unit-based Road Map projects that have the potential

Suzuki, Masatsugu

107

Road to Recovery: Bringing Recovery to Small Town America  

ScienceCinema (OSTI)

The Recovery Act hits the road to reach out to surrounding towns of the Savannah River Site that are struggling with soaring unemployment rates. This project helps recruit thousands of people to new jobs in environmental cleanup at the Savannah River Site.

Nettamo, Paivi

2012-06-14T23:59:59.000Z

108

Knowledge-Projection for Tele-Maintenance  

E-Print Network [OSTI]

requests, user input requests, system status requests, ... ­ Data linkage across all relevant information ­ Bridging the "disconnect" between process actions and part issue · Linkage to Support Information

Tu, Yicheng

109

Tips and Tools for Promoting Your Energy Efficiency Project ...  

Broader source: Energy.gov (indexed) [DOE]

not only on energy costs, but down the road in terms of savings on maintenance or avoided costs from other sources. Really thinking about what the money savings is will help you...

110

Microsoft Word - CX-GrandCouleeDistrictWoodPoleReplacementsAccessRoads...  

Broader source: Energy.gov (indexed) [DOE]

7, 2013 REPLY TO ATTN OF: KEPR-Bell-1 SUBJECT: Environmental Clearance Memorandum Todd Wehner Civil DesignAccess Roads - TELF-TPP-3 James Semrau Project Manager - TEP-TPP-1...

111

The Australasian College of Road Safety Road Safety 2020: Smart Solutions, Sustainability, Vision, Conference Proceedings, 5-6 November 2009  

E-Print Network [OSTI]

The Australasian College of Road Safety Road Safety 2020: Smart Solutions, Sustainability, Vision Solutions, Sustainability, Vision The Australasian College of Road Safety Conference, Perth, Western Australia : Australia (2009)" #12;The Australasian College of Road Safety Road Safety 2020: Smart Solutions

Paris-Sud XI, Université de

112

CHESTNUT RIDGE RD VALLEY ROAD  

E-Print Network [OSTI]

SIGN TO: OAK RIDGE, Y-12,AND KNOXVILLE CHESTNUT RIDGE ROAD FIRSTSTREET 95 95 HFIR and SNS Sites #12;SNS PARKING CNMS PARKING COVERED BRIDGE 8310 87008910 8913 8911 8100 8330 CHESTNUT RIDGE RD TO

113

RESTRICTED ACCESS to Groat Road  

E-Print Network [OSTI]

AveUniversity Ave University Ave South Ave 80 Ave 82 Ave Braithwaite Park North Saskatchewan River Mc Ave Edinboro Road Saskatchewan Drive Saskatchewan Drive Saskatchewan Drive 88 Corbett Field West

MacMillan, Andrew

114

Microsoft Word - CX-BigEddy-Redmond-ConductorMaintenance-FY13...  

Broader source: Energy.gov (indexed) [DOE]

4, 2013 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Stacy Hensley Project Manager - TEP-CSB-2 Proposed Action: Conductor maintenance on Bonneville Power...

115

A formal ontology for industrial maintenance  

E-Print Network [OSTI]

strategies (preventive maintenance, predictive maintenance, corrective maintenance), to managing operators1 A formal ontology for industrial maintenance Authors: 1- Dr. Mohamed Hedi KARRAY, LGP The rapid advancement of information and communication technologies has resulted in a variety of maintenance

Boyer, Edmond

116

CH Packaging Maintenance Manual  

SciTech Connect (OSTI)

This procedure provides instructions for performing inner containment vessel (ICV) and outer containment vessel (OCV) maintenance and periodic leakage rate testing on the following packaging seals and corresponding seal surfaces using a nondestructive helium (He) leak test. In addition, this procedure provides instructions for performing ICV and OCV structural pressure tests.

Washington TRU Solutions

2002-01-02T23:59:59.000Z

117

ADEC II Universal SCR Retrofit System for On-road and Off-road...  

Broader source: Energy.gov (indexed) [DOE]

ADEC II Universal SCR Retrofit System for On-road and Off-road Diesel Engines Richard Carlson Extengine Transport Systems, LLC Fullerton, California 2006 DEER Conference Poster...

118

Municipal Support of Projects (Iowa)  

Broader source: Energy.gov [DOE]

Municipalities may choose to support projects, such as those which will generate electricity through the use of a renewable energy source, by tax-exempt bond financing; easements for roads, water...

119

Proposed SOLCOST maintenance activities  

SciTech Connect (OSTI)

This document provides a short description of work that has been accomplished to date and work in progress. A discussion of the program status as it is currently configured follows and finally proposed work by Solar Environmental Engineering Company (SEEC) in its most recently signed contract with the Department of Energy (DOE) is given. Early statements are designed to give the reader a good background so that the suggested SOLCOST maintenance activities will be more easily understood.

none,

1980-01-01T23:59:59.000Z

120

Nitrous Oxide Systems Maintenance in Clinical Areas  

E-Print Network [OSTI]

. It specifically speaks to maintenance of nitrous oxide delivery systems, preventive maintenance for house. Arrange with Facilities for regular preventive maintenance and annual performance check of ventilation). b. Provides preventive maintenance on ventilation system as necessary. c. Coordinates annual

Jia, Songtao

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Shaftesbury Road Site The Edinburgh Building  

E-Print Network [OSTI]

Shaftesbury Road Site The Edinburgh Building Shaftesbury Road, Cambridge CB2 8RU, UK Phone +44 (0@cambridge.org www.cambridge.org/casscentre Cambridge City Centre The Pitt Building Trumpington Street, Cambridge CB2.cambridge.org/bookshop By car Visitor parking is available on the Shaftesbury Road site. If visiting the pitt Building

Mackenzie, Kirill

122

Scheduling with Fixed Maintenance, Shared Resources and ...  

E-Print Network [OSTI]

Nov 17, 2014 ... maintenance constraints, blending and shared resources. ...... tegrated fixed time interval preventive maintenance and production for schedul-.

2015-02-07T23:59:59.000Z

123

Africa's Transport Infrastructure Mainstreaming Maintenance and...  

Open Energy Info (EERE)

Mainstreaming Maintenance and Management Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Africa's Transport Infrastructure Mainstreaming Maintenance and Management...

124

Genepool Quarterly Maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun with Big Sky Learning Fun withGenepool Quarterly MaintenanceGenepool

125

Operations & Maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recoveryLaboratorySpeeding access1 TechnicalOilOnlineandOperations and Maintenance

126

Applicability of Operational Research Techniques in CANDU Nuclear Plant Maintenance  

SciTech Connect (OSTI)

As previously reported at ICONE 6 in New Orleans, 1996, and ICONE 9 in Niece, 2001, the use of various maintenance optimization techniques at Bruce has lead to cost effective preventive maintenance applications for complex systems. Innovative practices included greatly reducing Reliability Centered Maintenance (RCM) costs while maintaining the accuracy of the analysis. The optimization strategy has undergone further evolution and at the present an Integrated Maintenance Program (IMP) is being put in place. Further cost refinement of the station preventive maintenance strategy whereby decisions are based on statistical analysis of historical failure data is being evaluated. A wide range of Operational Research (OR) literature was reviewed for implementation issues and several encouraging areas were found that will assist in the current effort of evaluating maintenance optimization techniques for nuclear power production. The road ahead is expected to consist first of resolving 25 years of data issues and preserving the data via appropriate knowledge system techniques while post war demographics permit experts to input into the system. Subsequent analytical techniques will emphasize total simplicity to obtain the requisite buy in from Corporate Executives who possibly are not trained in Operational Research. Case studies of containment airlock seal failures are used to illustrate the direct applicability of stochastic processes. Airlocks and transfer chambers were chosen as they have long been known as high maintenance items. Also, the very significant financial consequences of this type of failure will help to focus the attention of Senior Management on the effort. Despite substantial investment in research, improvement in the design of the seal material or configuration has not been achieved beyond the designs completed in the 1980's. Overall, the study showed excellent agreement of the relatively quick stochastic methods with the maintenance programs produced at great cost over years of trial and error. The pivotal role of expert opinion via experienced users/problem owners/maintenance engineers in all phases of the method and its application was noted and will be explored in subsequent efforts. The results are displayed via economic alternatives to more easily attract the attention of Maintenance Managers. Graphical overviews of the data demonstrated that substantial insight can be gained by simply organizing the data into statistically meaningful arrays such as histograms. The conclusions highlight several very positive avenues to evaluate at this particular juncture in time. (author)

Doyle, E. Kevin [Bruce Power LP, Box 4000B12, Tiverton, Ont., N0G2T0 (Canada)

2002-07-01T23:59:59.000Z

127

Risk-based maintenance modeling. Prioritization of maintenance importances and quantification of maintenance effectiveness  

SciTech Connect (OSTI)

This report describes methods for prioritizing the risk importances of maintenances using a Probabilistic Risk Assessment (PRA). Approaches then are described for quantifying their reliability and risk effects. Two different PRA importance measures, minimal cutset importances and risk reduction importances, were used to prioritize maintenances; the findings show that both give similar results if appropriate criteria are used. The justifications for the particular importance measures also are developed. The methods developed to quantify the reliability and risk effects of maintenance actions are extensions of the usual reliability models now used in PRAs. These extended models consider degraded states of the component, and quantify the benefits of maintenance in correcting degradations and preventing failures. The negative effects of maintenance, including downtimes, also are included. These models are specific types of Markov models. The data for these models can be obtained from plant maintenance logs and from the Nuclear Plant Reliability Data System (NPRDS). To explore the potential usefulness of these models, the authors analyzed a range of postulated values of input data. These models were used to examine maintenance effects on a components reliability and performance for various maintenance programs and component data. Maintenance schedules were analyzed to optimize the component`s availability. In specific cases, the effects of maintenance were found to be large.

Vesely, W.E.; Rezos, J.T. [Science Applications International Corp., Dublin, OH (United States)

1995-09-01T23:59:59.000Z

128

Development of a maintenance program  

SciTech Connect (OSTI)

Bruce Nuclear Generating Station (NGS) A in Tiverton, Ontario, has been operating for 10 yr. One reason for its successful operating record is the development of an effective preventive maintenance program. Evaluation of the existing preventive program included a review of maintenance of selected key equipment over the life of the station. The review emphasized the need to improve the storage and sorting of maintenance information for trend and cost analysis, manpower planning, reliability, and radiation dose calculations.

Walker, I.

1987-01-01T23:59:59.000Z

129

Hallmark Project  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietip sheetK-4In 2013 many autoThis road map isofAOnOctoberProject

130

PROJECT MANUAL FOR: Strand Union Building  

E-Print Network [OSTI]

...............................................................................................................017700 Operation and Maintenance Data .............................................................................................................. BP CONTRACT DOCUMENTS Included in the Printed Project Manual: Sample Standard Form of Contract, Form..................................................................................013100 Submittal Procedures

Dyer, Bill

131

Landscape Maintenance Considerations for Homeowner  

E-Print Network [OSTI]

Landscape Maintenance Considerations for Homeowner Associations: Save Money, Be Safe, Look Good is getting their money's worth from the landscape maintenance company. Photo credit: Asset Landscaping! Kelly Murray Young Haley Paul #12;1. Consider landscape plants a long- term investment · Trees

Sanderson, Mike

132

Asphalt, Concrete, and Turf Maintenance and Preservation  

E-Print Network [OSTI]

preventive maintenance, pavement distress and identification, and best practices for the maintenance Consultant WSB and Associates, Inc. 763-287-7184 jstewart@wsbeng.com #12;2 Preventive Maintenance Preventive maintenance and minor rehab, and is often used to repair environmental damage. Preventive maintenance narrows

Minnesota, University of

133

ROAD-MAN-LANDSCAPE -IN THEORY ASB155 Road-man-landscape -in theory  

E-Print Network [OSTI]

and environmental requirements. Innehåll: Course content: New roads in the landscape. Conversion concepts in traffic planning, road construction, landscape architecture, urban architecture, planning for masters (graduate) students of engineering, architecture and landscape architecture, and future planners

134

ROAD-MAN-LANDSCAPE -DESIGNPROJECT ASB150 Road-man-landscape -designproject  

E-Print Network [OSTI]

, landscape and environmental requirements. Innehåll: Course content: New roads in the landscape. Conversion concepts in traffic planning, road construction, landscape architecture, urban architecture, planning (graduate) students of engineering, architecture and landscape architecture, and future planners

135

The Facility The Propellants North Administrative and Maintenance  

E-Print Network [OSTI]

and Maintenance Facility Inside Propellants North is window glazing and framing from the iconic firing rooms with energy recovery technology · Highly insulated roof and walls · Lighting fixtures with smart lighting glazing and framing · Reclaimed and processed waste concrete from Kennedy's demolition projects

136

EA-1697: San Joaquin Valley Right-of-Way Project, California  

Broader source: Energy.gov [DOE]

DOEs Western Area Power Administration is preparing this EA to evaluate the environmental impacts of right-of-way maintenance (including facility inspection and repair, vegetation management, and equipment upgrades for transmission lines and associated rights-or-way, access roads, substations, and a maintenance facility) in the San Joaquin Valley in California.

137

Operations and Maintenance Program Measurement  

Broader source: Energy.gov [DOE]

Operations and maintenance (O&M) measurement tends to focus on reliability as the sole metric. Every Federal agency wants a reliable facility, but this metric alone is not enough to build a...

138

Maintenance Practices for LED Streetlights  

Broader source: Energy.gov [DOE]

This April 14, 2014 webinar answered important questions about the maintenance and reliability of LED streetlights, and how to take these issues into account when planning and preparing for a...

139

Maintenance FUSION IGNITION RESEARCH EXPERIMENT  

E-Print Network [OSTI]

Insulation Enclosure Remote Maintenance Module FUSION IGNITION RESEARCH EXPERIMENT SYSTEM describes the status of the configuration development and the integration of the major subsystem components vessel structural stiffness, this configuration makes use of the cooling jacket as nuclear shielding

140

Categorical Exclusion for Maintenance Work  

Broader source: Energy.gov (indexed) [DOE]

Maintenance Work along the Electrical District 5 to Saguaro segment (414 to 585) of the Maricopa-Saguaro 115-kV Transmission Line, between Friendly Comers and Marana, Pinal...

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Operations and Maintenance Management Support  

Broader source: Energy.gov [DOE]

Federal operations and maintenance (O&M) programs must gain full support from management to succeed. Management understanding and buying into the program elevates O&M importance and allows...

142

Business Development - Predictive Maintenance Products  

E-Print Network [OSTI]

BUSINESS DEVELOPMENT - PREDICTIVE MAINTENANCE PRODUCTS Phillip Sceiczina, ifm efector, inc. In this time of global competitiveness, more companies are focusing on reducing manufacturing costs to increase profits. Energy costs can be a...

Sceiczina, P.

2005-01-01T23:59:59.000Z

143

Sustainable Operations & Maintenance Implementation Support  

E-Print Network [OSTI]

, and purchasing policy: Energy efficiency cannot exist without accountability and organizational support energy efficiency in buildings. Organizational innovation for energy conservation; Organizations face of energy efficiency. Meetings with facilities personnel, maintenance staff, building managers, building oc

144

ENERGY STRATEGY: THE ROAD NOT TAKEN?  

E-Print Network [OSTI]

ENERGY STRATEGY: THE ROAD NOT TAKEN? By Amory B. Lovins Two road5 diverged in a wood, and I-- I are America's formal or de facto energy policies leading us? Where might we choose to go instead? How can we concepts in energy strategy by outlining and contrasting two en- ergy paths tbat the United States might

Kammen, Daniel M.

145

Safety Considerations When Driving on Rural Roads  

E-Print Network [OSTI]

procedures to follow. Characteristics of rural or forest roads Extra caution is required when driving-moving vehicles, animals, debris) · Unusually steep hills or sharp curves Since help may often be difficult.Agricultural or prescribed forest burning may produce smoke on roads. Hazard: Approaching vehicles, livestock or wild animals

Vivoni, Enrique R.

146

Turfgrass: Maintenance Costs in Texas.  

E-Print Network [OSTI]

. These regions also have high water costs. The Gulf Coast, where water is a minor item, has an average expenditure only slightly greater than half that in West Texas. Average lawn sizes in these two regions are almost identical. Use of com- post, commercial.... Individuals with grasses other than bermuda and St. Augustine spend on the average about 53 percent TARLE 2. TOTALS OF VARIOUS HOME LAWN MAINTENANCE EXPENDITURES WITHIN REGIONS AND FOR THE STATE1 Number of Maintenance items Region households Commercial...

Holt, Ethan C.; Allen, W. Wayne; Ferguson, Marvin H.

1964-01-01T23:59:59.000Z

147

Road Transportable Analytical Laboratory system. Phase 1  

SciTech Connect (OSTI)

This developmental effort clearly shows that a Road Transportable Analytical Laboratory System is a worthwhile and achievable goal. The RTAL is designed to fully analyze (radioanalytes, and organic and inorganic chemical analytes) 20 samples per day at the highest levels of quality assurance and quality control. It dramatically reduces the turnaround time for environmental sample analysis from 45 days (at a central commercial laboratory) to 1 day. At the same time each RTAL system will save the DOE over $12 million per year in sample analysis costs compared to the costs at a central commercial laboratory. If RTAL systems were used at the eight largest DOE facilities (at Hanford, Savannah River, Fernald, Oak Ridge, Idaho, Rocky Flats, Los Alamos, and the Nevada Test Site), the annual savings would be $96,589,000. The DOE`s internal study of sample analysis needs projects 130,000 environmental samples requiring analysis in FY 1994, clearly supporting the need for the RTAL system. The cost and time savings achievable with the RTAL system will accelerate and improve the efficiency of cleanup and remediation operations throughout the DOE complex.

Finger, S.M.; Keith, V.F.; Spertzel, R.O.; De Avila, J.C.; O`Donnell, M.; Vann, R.L.

1993-09-01T23:59:59.000Z

148

Canadian Solar Road Panel Design: A Structural and Environmental Analysis.  

E-Print Network [OSTI]

??Solar road panels are a technology that have the ability to revolutionize the way that roads are built and how electricity is generated. Strong incentives (more)

Northmore, Andrew

2014-01-01T23:59:59.000Z

149

Innovative technology summary report: Road Transportable Analytical Laboratory (RTAL)  

SciTech Connect (OSTI)

The Road Transportable Analytical Laboratory (RTAL) has been used in support of US Department of Energy (DOE) site and waste characterization and remediation planning at Fernald Environmental Management Project (FEMP) and is being considered for implementation at other DOE sites, including the Paducah Gaseous Diffusion Plant. The RTAL laboratory system consists of a set of individual laboratory modules deployable independently or as an interconnected group to meet each DOE site`s specific analysis needs. The prototype RTAL, deployed at FEMP Operable Unit 1 Waste Pits, has been designed to be synergistic with existing analytical laboratory capabilities, thereby reducing the occurrence of unplanned rush samples that are disruptive to efficient laboratory operations.

NONE

1998-10-01T23:59:59.000Z

150

E-Print Network 3.0 - access roads Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Collection: Computer Technologies and Information Sciences 64 Colorado Forest Road Field Handbook Summary: . . . . . . . . . . . . 3 Road Access . . . . . . . . . . . . . . . . ....

151

USVI Energy Road Map: Charting the Course to a Clean Energy Future (Brochure)  

SciTech Connect (OSTI)

This brochure provides an overview of the integrated clean energy deployment process and progress of the Energy Development in Island Nations U.S. Virgin Islands pilot project road map, including over-arching goals, organization, strategy, technology-specific goals and accomplishments, challenges, solutions, and upcoming milestones.

Not Available

2011-07-01T23:59:59.000Z

152

Dynamic Scheduling of Maintenance Activities Under Uncertainties  

E-Print Network [OSTI]

of the required treatment. There are mainly two types of maintenance activities: the preventive maintenance, whoseDynamic Scheduling of Maintenance Activities Under Uncertainties Fran¸cois Marmier, Christophe in maintenance services field where the different practical knowledges or skills are their working tools. We

Paris-Sud XI, Université de

153

Chapter 6.14 PROPERTY MAINTENANCE  

E-Print Network [OSTI]

Chapter 6.14 PROPERTY MAINTENANCE Sections: 6.14.010 Findings. 6.14.020 Landscape Maintenance. 6 of landscaping and/or landscape maintenance on private property, including overgrown, dead, or decayed vegetation of the residents of the City of Riverside. (Ord. 6970 § 2, 2007) Section 6.14.020 Landscape maintenance. A

Lyubomirsky, Ilya

154

Operations and Maintenance Manual for Large Aperture Scanner System  

SciTech Connect (OSTI)

Operations and maintenance manual includes detailed instructions for system assembly, use, and maintenance.

Jones, Anthony M.; Hall, Thomas E.

2010-04-08T23:59:59.000Z

155

A quadratic algorithm for road coloring  

E-Print Network [OSTI]

The road coloring theorem states that every aperiodic directed graph with constant out-degree has a synchronized coloring. This theorem had been conjectured during many years as the road coloring problem before being settled by A. Trahtman. Trahtman's proof leads to an algorithm that finds a synchronized labeling with a cubic worst-case time complexity. We show a variant of his construction with a worst-case complexity which is quadratic in time and linear in space. We also extend the road coloring theorem to the periodic case.

Bal, Marie-Pierre

2008-01-01T23:59:59.000Z

156

Opportune maintenance and predictive maintenance decision support douard Thomas, ric Levrat, Benoit Iung, Pierre Cocheteux  

E-Print Network [OSTI]

: When to perform a particular maintenance action? What components should benefit from a preventive maintenance action? Which components should first benefit from a preventive maintenance interventionOpportune maintenance and predictive maintenance decision support ?douard Thomas, ?ric Levrat

Paris-Sud XI, Université de

157

Airline Fleet Maintenance: Trade-off Analysis of Alternate Aircraft Maintenance Approaches  

E-Print Network [OSTI]

-based. The preventative alternative involves the transmission of maintenance data to maintenance personnel whenAirline Fleet Maintenance: Trade-off Analysis of Alternate Aircraft Maintenance Approaches Mike Dupuy, Dan Wesely, Cody Jenkins Abstract ­ Airline maintenance is a significant contributor

158

Iron production maintenance effectiveness system  

SciTech Connect (OSTI)

In 1989, an internal study in the Coke and Iron Maintenance Department identified the opportunities available to increase production, by decreasing unscheduled maintenance delays from 4.6%. A five year front loaded plan was developed, and presented to the company president. The plan required an initial investment of $1.4 million and a conservative break-even point was calculated to be 2.5 years. Due to budget restraints, it would have to be self-funded, i.e., generate additional production or savings, to pay for the program. The program began in 1991 at number 2 coke plant and the blast furnaces. This paper will describe the Iron Production Maintenance Effectiveness System (ME), which began with the mechanical and pipefitting trades.

Augstman, J.J. [Dofasco Inc., Hamilton, Ontario (Canada)

1996-12-31T23:59:59.000Z

159

Mead-Liberty 345-kV Transmission Line Access Road Maintenance...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

species (such as under the Bald and Golden Eagle Protection Act or the Migratory Bird Treaty Act); X (iii) Floodplains and wetlands (as defined in 10 CFR 1022.4, -Compliance with...

160

Mead-Liberty 345-kV Transmission Line Access Road Maintenance and Localized Vegetation Management  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces andMapping the Nanoscale LandscapeImportsBG4, 2012 1:00 -2 Mead-Liberty

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

St. Lucie County Cooperative Extension 8400 Picos Road, Suite 101  

E-Print Network [OSTI]

If Commercial Landscape Maintenance workers want to legally apply "Caution" labeled pesticides including of a chapter 482 "Limited Commercial Landscape Maintenance license". In order to obtain this license Landscape Maintenance Training workshop plus pass a Limited Certification Landscape Maintenance exam

Watson, Craig A.

162

On-road remote sensing of vehicle emissions in  

E-Print Network [OSTI]

On-road remote sensing of vehicle emissions in the Auckland Region August 2003 Technical 1877353000 www.arc.govt.nz #12;TP 198 On-Road Remote Sensing of Vehicle Emissions in the Auckland Region #12;Page i TP 198 On-Road Remote Sensing of Vehicle Emissions in the Auckland Region On-road remote sensing

Denver, University of

163

The Political Economy of Private Roads David Levinson  

E-Print Network [OSTI]

to the generating plants in the electricity sector. What are not private, of course, are the roads them- selves4 The Political Economy of Private Roads David Levinson CosaNostra Pizza #3569 is on Vista Road in road privatization and alternative financing, not just by science fiction writ- ers, anarchists

Levinson, David M.

164

HCEI Road Map: 2011 Edition (Brochure)  

SciTech Connect (OSTI)

This road map outlines the 2011 key goals and strategies of the Hawaii Clean Energy Initiative, was founded based on a Memorandum of Understanding between the State of Hawaii and the U.S. Department of Energy in 2008.

Braccio, R.; Finch, P.

2011-08-01T23:59:59.000Z

165

Dynamic Maintenance of Service Orchestrations  

E-Print Network [OSTI]

-Rocquencourt, France Valérie Issarny INRIA Paris-Rocquencourt, France ABSTRACT Service-oriented architectures evolved/orchestration of services. One of the next challenges in this field is the maintenance of service-oriented architectures orchestrations. 1. INTRODUCTION Service Oriented Architecture (SOA) is an architectural style that emerged

Boyer, Edmond

166

CCS Maasvlakte (ROAD-project) Toetsingsadvies over het milieueffectrapport  

E-Print Network [OSTI]

voorkomen wordt door 1 Een joint-venture van E.ON Benelux, Electrabel Nederland/GDF SUEZ. 2 CCS Maasvlakte

Hack, Robert

167

DOE Issues Environmental Assessment on Road Project for Public Review  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed Newcatalyst phases onOrganization FYBeau Newman Select80.2 DOE HQ FFAREWELLDOEBrad

168

Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM)  

Broader source: Energy.gov [DOE]

Overall direction for surveillance and maintenance of excess facilities is addressed in DOE G 430.1-2, IMPLEMENTATION GUIDE FOR SURVEILLANCE AND MAINTENANCE DURING FACILITY TRANSITION AND...

169

Steam turbine maintenance and repair technology: Reducing planned-outage costs  

SciTech Connect (OSTI)

The North American Electric Reliability Council (NAERC) reported that the average loss of equivalent availability per outage for a major fossil turbine overhaul is 323,000 MW-HR. The Electric Power Research Institute (EPRI) Generation and Storage Division, is in the first phase of a major research project to reduce the duration and/or frequency of steam turbine maintenance outages. This project consists of an assessment of the current state-of-the-art turbine maintenance and repair techniques and technologies. It is based on a review of current turbine maintenance practices of the US, European, Japanese, and Australian utility industries. Emphasized are maintenance and repair activities that have the most significant impact on outage duration or frequency. Twenty-six key turbine maintenance activities and the current best techniques were identified for use by utility maintenance personnel. Overall outage durations could be reduced if the duration of these activities were shortened or if they were performed more effectively. Recommended projects for development of advanced steam turbine maintenance technology were identified. 29 refs., 46 figs., 9 tabs.

Grace, H.P.; McClintock, M. (General Physics Corp., Columbia, MD (USA)); Lamping, G. (Southwest Research Inst., San Antonio, TX (USA))

1990-04-01T23:59:59.000Z

170

EIS-0411: Transmission Agency of Northern California Transmission Project  

Broader source: Energy.gov [DOE]

This EIS is for the Western Area Power Administration construction, operation, and maintenance of the proposed transmission agency of Northern California Transmission Project, California.

171

Open source software development and maintenance: an exploratory analysis  

E-Print Network [OSTI]

.3 Significance of Software Development and Maintenance Research. 6 1.4 Research Scope???????????????????? 7 1.5 Organization of this Dissertation?????????????. 9 II PROJECT VIABILITY: A MULTIDIMENSIONAL MEASURE?. 10 2... ???????. 89 4.7 Acceptable ranges of ROC value?????????????????. 90 4.8 Classification for the LR model?????????????????? 93 4.9 Process related variable measurement and sources?????????? 99 xi TABLE Page 4.10 Product related variable...

Raja, Uzma

2009-06-02T23:59:59.000Z

172

Project Information Form Project Title Do California Highways Act as Barriers to Gene Flow for Ground-Dwelling  

E-Print Network [OSTI]

(by each agency or organization) Caltrans $78,395 Total Project Cost $78,395 Agency ID or ContractProject Information Form Project Title Do California Highways Act as Barriers to Gene Flow of Research Project Roads can act as significant barriers to wildlife dispersal, creating small fragmented

California at Davis, University of

173

Invertible Program Restructurings for Continuing Modular Maintenance  

E-Print Network [OSTI]

Invertible Program Restructurings for Continuing Modular Maintenance Julien Cohen ASCOLA team (EMN in main- tenance with invertible program transformations. We illustrate this on the typical Expression problems with our approach. Keywords-modular maintenance; restructuring; invertible pro- gram

Paris-Sud XI, Université de

174

Effects of dairy intake on weight maintenance  

E-Print Network [OSTI]

, randomized trial. Weight loss was baseline to 3 months, weight maintenance was 4 to 9 months. Participants were maintained randomly assigned to low dairy ( 3 servings/d) diets for the maintenance phase. Three...

Zemel, Michael B.; Donnelly, Joseph E.; Smith, Bryan K.; Sullivan, Debra K.; Richards, Joanna; Morgan-Hanusa, Danielle; Mayo, Matthew S.; Sun, Xiaocun; Cook-Wiens, Galen; Bailey, Bruce W.; Van Walleghen, Emily L.; Washburn, Richard A.

2008-10-24T23:59:59.000Z

175

Mining Surveillance and Maintenance Dollars  

SciTech Connect (OSTI)

Accelerating site cleanup to reduce facility risks to the workers, the public and the environment during a time of declining federal budgets represents a significant technical and economic challenge to U.S. Department of Energy (DOE) Operations Offices and their respective contractors. A significant portion of a facility's recurring annual expenses are associated with routine, long-term surveillance and maintenance (S&M) activities. However, ongoing S&M activities do nothing to reduce risks and basically spend money that could be reallocated towards facility deactivation. This paper discusses the background around DOE efforts to reduce surveillance and maintenance costs, one approach used to perform cost reviews, lessons learned from field implementation and what assistance is available to assist DOE sites in performing these evaluations.

MARTINEZ, R.

2000-02-01T23:59:59.000Z

176

Maintenance and Prevention: Formalization and Fixpoint Characterization  

E-Print Network [OSTI]

Maintenance and Prevention: Formalization and Fixpoint Characterization Munindar P. Singh Maintenance and prevention are important concepts in the science of intel­ ligent systems, yet serious research attention. Maintenance and prevention are duals of each other, but cannot be reduced

177

ROBUSTNESS MEASURE FOR FUZZY MAINTENANCE ACTIVITIES SCHEDULE  

E-Print Network [OSTI]

activities: the preventive maintenance, whose activities can be long term planned, and the correctiveROBUSTNESS MEASURE FOR FUZZY MAINTENANCE ACTIVITIES SCHEDULE François MARMIER , Christophe VARNIER. Especially in the field of maintenance services where the different practical knowledge or skills

Paris-Sud XI, Université de

178

Optimal Preventive Maintenance Scheduling in Semiconductor Manufacturing  

E-Print Network [OSTI]

1 Optimal Preventive Maintenance Scheduling in Semiconductor Manufacturing Xiaodong Yao, Emmanuel on Control Applications in 2001. #12;2 Abstract Preventive Maintenance (PM) scheduling is a very challenging schedule with that of a baseline reference schedule are also presented. Index Terms preventive maintenance

Marcus, Steven I.

179

Prognostics for the Maintenance of Distributed Systems  

E-Print Network [OSTI]

but also higher level function prognosis. I. INTRODUCTION In the classical case, preventive maintenance of preventive maintenance for complex systems. In this sense, a distributed system can be split down into a setPrognostics for the Maintenance of Distributed Systems Pauline Ribot, Yannick Pencol´e and Michel

Pencolé, Yannick

180

Laboratory services series: a programmed maintenance system  

SciTech Connect (OSTI)

The diverse facilities, operations and equipment at a major national research and development laboratory require a systematic, analytical approach to operating equipment maintenance. A computer-scheduled preventive maintenance program is described including program development, equipment identification, maintenance and inspection instructions, scheduling, personnel, and equipment history.

Tuxbury, D.C.; Srite, B.E.

1980-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

STANDARD OPERATING PROCEDURES Annual Site Maintenance  

E-Print Network [OSTI]

IMPROVE STANDARD OPERATING PROCEDURES SOP 226 Annual Site Maintenance Date Last Modified Modified This standard operating procedure (SOP) describes the procedures for annual maintenance of equipment Sampler Operation Manual #12;SOP 226: Annual Site Maintenance 3 1.0 PURPOSE AND APPLICABILITY

Fischer, Emily V.

182

Preventative Maintenance (PM) Policy Outline the policy regarding preventative vehicle maintenance on University of Michigan (U-  

E-Print Network [OSTI]

Preventative Maintenance (PM) Policy Objective Outline the policy regarding preventative vehicle maintenance on University of Michigan (U- M) vehicles. Policy 1. All maintenance performed on U-M vehicles their own campus maintenance facility to repair their fleet vehicles. 2. To ensure proper stewardship of U

Kirschner, Denise

183

Vehicle Maintenance Policy Outline the policy regarding vehicle maintenance at University of Michigan (U-M).  

E-Print Network [OSTI]

Vehicle Maintenance Policy Objective Outline the policy regarding vehicle maintenance at University of Michigan (U-M). Policy 1. All maintenance performed on U-M vehicles must be coordinated through Garage to repair their fleet vehicles. 2. U-M vehicles leased through Fleet Services include routine maintenance

Kirschner, Denise

184

Pacific Northwest Laboratory Maintenance Implementation plan  

SciTech Connect (OSTI)

This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory`s (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change {number_sign}3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services` current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

Bright, J.D.

1992-06-01T23:59:59.000Z

185

Pacific Northwest Laboratory Maintenance Implementation plan  

SciTech Connect (OSTI)

This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory's (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change {number sign}3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services' current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

Bright, J.D.

1992-06-01T23:59:59.000Z

186

Optimal Joint Preventive Maintenance and Production Policies* Xiaodong Yao  

E-Print Network [OSTI]

Optimal Joint Preventive Maintenance and Production Policies* Xiaodong Yao SAS Institute Inc. Cary preventive maintenance (PM) and production policies for an unreliable production-inventory system in which to establish some additional structural properties. Keywords: optimal preventive maintenance, joint maintenance

Marcus, Steven I.

187

Road-corridor planning in the EIA procedure in Spain. A review of case studies  

SciTech Connect (OSTI)

The assessment of different alternatives in road-corridor planning must be based on a number of well-defined territorial variables that serve as decision making criteria, and this requires a high-quality preliminary environmental assessment study. In Spain the formal specifications for the technical requirements stipulate the constraints that must be considered in the early stages of defining road corridors, but not how they should be analyzed and ranked. As part of the feasibility study of a new road definition, the most common methodology is to establish different levels of Territorial Carrying Capacity (TCC) in the study area in order to summarize the territorial variables on thematic maps and to ease the tracing process of road-corridor layout alternatives. This paper explores the variables used in 22 road-construction projects conducted by the Ministry of Public Works that were subject to the Spanish EIA regulation and published between 2006 and 2008. The aim was to evaluate the quality of the methods applied and the homogeneity and suitability of the variables used for defining the TCC. The variables were clustered into physical, environmental, land-use and cultural constraints for the purpose of comparing the TCC values assigned in the studies reviewed. We found the average quality of the studies to be generally acceptable in terms of the justification of the methodology, the weighting and classification of the variables, and the creation of a synthesis map. Nevertheless, the methods for assessing the TCC are not sufficiently standardized; there is a lack of uniformity in the cartographic information sources and methodologies for the TCC valuation. -- Highlights: We explore 22 road-corridor planning studies subjected to the Spanish EIA regulation. We analyze the variables selected for defining territorial carrying capacity. The quality of the studies is acceptable (methodology, variable weighting, mapping). There is heterogeneity in the methods for territorial carrying capacity valuation.

Loro, Manuel, E-mail: manuel.loro@upm.es [Department of Urban and Regional Planning and Environment, Civil Engineering School, Universidad Politcnica de Madrid, Prof. Aranguren s/n, 28040 Madrid (Spain) [Department of Urban and Regional Planning and Environment, Civil Engineering School, Universidad Politcnica de Madrid, Prof. Aranguren s/n, 28040 Madrid (Spain); Transport Research Centre (TRANSyT-UPM) Universidad Politcnica de Madrid, ETSI Caminos, Canales y Puertos, Prof. Aranguren s/n, 28040 Madrid (Spain); Centro de investigacin del transporte, TRANSyT-UPM, ETSI Caminos, Canales y Puertos, Universidad Politcnica de Madrid, Prof. Aranguren s/n, 28040 Madrid (Spain); Arce, Rosa M., E-mail: rosa.arce.ruiz@upm.es [Department of Urban and Regional Planning and Environment, Civil Engineering School, Universidad Politcnica de Madrid, Prof. Aranguren s/n, 28040 Madrid (Spain); Transport Research Centre (TRANSyT-UPM) Universidad Politcnica de Madrid, ETSI Caminos, Canales y Puertos, Prof. Aranguren s/n, 28040 Madrid (Spain); Centro de investigacin del transporte, TRANSyT-UPM, ETSI Caminos, Canales y Puertos, Universidad Politcnica de Madrid, Prof. Aranguren s/n, 28040 Madrid (Spain); Ortega, Emilio, E-mail: e.ortega@upm.es [Transport Research Centre (TRANSyT-UPM) Universidad Politcnica de Madrid, ETSI Caminos, Canales y Puertos, Prof. Aranguren s/n, 28040 Madrid (Spain) [Transport Research Centre (TRANSyT-UPM) Universidad Politcnica de Madrid, ETSI Caminos, Canales y Puertos, Prof. Aranguren s/n, 28040 Madrid (Spain); Centro de investigacin del transporte, TRANSyT-UPM, ETSI Caminos, Canales y Puertos, Universidad Politcnica de Madrid, Prof. Aranguren s/n, 28040 Madrid (Spain); Department of Construction and Rural Roads, Forestry Engineering School, Universidad Politcnica de Madrid, Ciudad Universitaria s/n, 28040 Madrid (Spain); and others

2014-01-15T23:59:59.000Z

188

A Study of Maintenance Contribution to a Joint Production and Preventive maintenance Scheduling Problem in the Robustness  

E-Print Network [OSTI]

A Study of Maintenance Contribution to a Joint Production and Preventive maintenance Scheduling production and Preventive Maintenance (PM) scheduling problem in the robustness framework. The contributions equipment reliability and performance loss under disruption Key words: Production, Preventive maintenance

Paris-Sud XI, Université de

189

Optimal Economic Selection of Road Design Standards for Timber Harvesting  

E-Print Network [OSTI]

with uniform conditions of road construction is to be accessed by truck road for timber harvest. A discrete when constructed to a given standard and used for timber haul depends fundamentally on the volume the entire length of the road even as haul volumes change are developed. Examples are given. FOR. SCI. 43

Greulich, Francis E.

190

ORIGINAL PAPER Wild Turkey (Meleagris gallopavo) association to roads  

E-Print Network [OSTI]

ORIGINAL PAPER Wild Turkey (Meleagris gallopavo) association to roads: implications for distance roads. Our objective was to determine if and when Rio Grande wild turkeys (Meleagris gallopavo gallopavo intermedia . Rio Grande wild turkey. Roads . Texas Communicated by H. Kierdorf D. R. Erxleben :M

Wallace, Mark C.

191

"MBUF Demo" "Mn Road Fee Test"  

E-Print Network [OSTI]

(40 mpg) Electric Vehicle (non-gas powered) State Tax * Federal Tax ** State Tax * Federal Tax"MBUF Demo" "Mn Road Fee Test" "IntelliDrive Connected Vehicles for Safety, Mobility and User Fee Overview Six Months In-Vehicle Data Collection Participant Recruited Equipment Deployed First Odometer

Minnesota, University of

192

Estimating Vehicle Miles Traveled on Local Roads  

E-Print Network [OSTI]

in social science and we relate it to traffic volumes. We demonstrate that VMT on local roads exhibits a scale-free property: it follows two piecewise (double) power law distributions. In other words, the total local VMT can be obtained by properly...

Qian, Jiayu

2013-11-07T23:59:59.000Z

193

ASSESSING CAUSAL FACTORS IN INDIVIDUAL ROAD ACCIDENTS  

E-Print Network [OSTI]

ASSESSING CAUSAL FACTORS IN INDIVIDUAL ROAD ACCIDENTS: COLLECTIVE RESPONSIBILITY IN FREEWAY REAR accident report: Happened on I-94 in downtown Minneapolis Happened during the afternoon peak period Vehicle" is a "condition or event" such that "had the condition or event been prevented...the accident would not occur

Minnesota, University of

194

Petroleum Service Projects in the Gulf of Guinea  

E-Print Network [OSTI]

carried out by the OIS group in the gulf of Guinea. The following are the specific projects in the Gulf of Guinea that I participated in: Managing delivering, maintenance and marketing of offshore vessels, Offshore pipe laying project, Integrated pipeline...

Ken-Worgu, Kenneth Chukwumeka

2011-10-21T23:59:59.000Z

195

Detection of Defects in Road Surface by a Vision N. T. Sy M. Avila, S. Begot and J. C. Bardet  

E-Print Network [OSTI]

. Bardet PRISME Institute-MCDS Team - Orleans University - IUT Chateauroux - France ) Vectra Road on a set of image processing tasks : bi-level thresholding, morphological operation, and projection. The method have been tested on three kinds of images: the first ones are images taken in laboratory in static

Paris-Sud XI, Université de

196

No maintenance -- no energy efficiency  

SciTech Connect (OSTI)

Field investigations illustrate that it is not realistic to expect new high-tech equipment to function for a full life expectancy at high efficiency without significant operations and maintenance (O&M). A simple walk through inspection of most buildings reveals extensive equipment that is being operated on manual override, is incorrectly adjusted and operating inefficiently, or is simply inoperative. This point is illustrated with two examples at Robins Air Force Base, Georgia. The first describes development of a comprehensive, base-wide, steam trap maintenance program. The second describes a measured evaluation from a typical office building. The objective of both examples was to assess the importance of proper O&M. The proposed ``O&M First`` philosophy will result in more efficient building HVAC operation, provide improved services to the building occupants, and reduce energy consumption and unscheduled equipment repair/replacement. Implementation of a comprehensive O&M program will result in a 15--25% energy savings. The O&M foundation that is established will allow other energy conservation activities such is demand side management or energy management and control systems, to achieve and maintain their expected energy savings.

Szydlowski, R.F.; Schliesing, J.S.; Winiarski, D.W.

1994-12-01T23:59:59.000Z

197

North Area Right-of-Way Maintenance Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the Contributions andDataNationalNewportBig Eddyof H-2 and O-2 inMuseum Lobby

198

North Area Right-of-Way Maintenance Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the Contributions andDataNationalNewportBig Eddyof H-2 and O-2 inMuseum LobbySacramento

199

Chapter 3 Project Components and Construction, Operation and Maintenance Activities  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed New Substation SitesStanding FriedelIron-Sulfur3-1 November 2012Chapter 26 -3-1

200

Hopper scheduled maintenance tomorrow (Sept 19) and /project outage  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun withconfinement plasmas inPortalAll NERSC userNewhigh

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Second Line of Defense: Electronic Maintenance Reports, Local Maintenance Provider User Guide, Rev. 3  

SciTech Connect (OSTI)

The Electronic Maintenance Report forms allow Local Maintenance Providers (LMP) and other program staff to enter maintenance information into a simple and secure system. This document describes the features and information required to complete the Maintenance Report forms. It is expected that all Corrective Maintenance Reports from LMPs will be submitted electronically into the SLD Portal. As an exception (e.g., when access to the SLD Portal is unavailable), Maintenance Reports can be submitted via a secure Adobe PDF form available through the Sustainability Manager assigned to each country.

Leigh, Richard J.

2012-09-01T23:59:59.000Z

202

INL Wind Farm Project Description Document  

SciTech Connect (OSTI)

The INL Wind Farm project proposes to install a 20 MW to 40 MW wind farm on government property, consisting of approximately ten to twenty full-sized (80-meter hub height) towers with 2 MW turbines, and access roads. This includes identifying the optimal turbine locations, building access roads, and pouring the tower foundations in preparation for turbine installation. The project successfully identified a location on INL lands with commercially viable wind resources (i.e., greater than 11 mph sustained winds) for a 20 to 40 MW wind farm. Additionally, the proposed Wind Farm was evaluated against other General Plant Projects, General Purpose Capital Equipment projects, and Line Item Construction Projects at the INL to show the relative importance of the proposed Wind Farm project.

Gary Siefert

2009-07-01T23:59:59.000Z

203

Life Cycle Assessment Comparing the Use of Jatropha Biodiesel in the Indian Road and Rail Sectors  

SciTech Connect (OSTI)

This life cycle assessment of Jatropha biodiesel production and use evaluates the net greenhouse gas (GHG) emission (not considering land-use change), net energy value (NEV), and net petroleum consumption impacts of substituting Jatropha biodiesel for conventional petroleum diesel in India. Several blends of biodiesel with petroleum diesel are evaluated for the rail freight, rail passenger, road freight, and road-passenger transport sectors that currently rely heavily on petroleum diesel. For the base case, Jatropha cultivation, processing, and use conditions that were analyzed, the use of B20 results in a net reduction in GHG emissions and petroleum consumption of 14% and 17%, respectively, and a NEV increase of 58% compared with the use of 100% petroleum diesel. While the road-passenger transport sector provides the greatest sustainability benefits per 1000 gross tonne kilometers, the road freight sector eventually provides the greatest absolute benefits owing to substantially higher projected utilization by year 2020. Nevertheless, introduction of biodiesel to the rail sector might present the fewest logistic and capital expenditure challenges in the near term. Sensitivity analyses confirmed that the sustainability benefits are maintained under multiple plausible cultivation, processing, and distribution scenarios. However, the sustainability of any individual Jatropha plantation will depend on site-specific conditions.

Whitaker, M.; Heath, G.

2010-05-01T23:59:59.000Z

204

Optimization Online - Optimizing Preventive Maintenance Models  

E-Print Network [OSTI]

Jun 29, 2004 ... Abstract: We deal with the problem of scheduling preventive maintenance (PM) by minimizing a performance function which reflects repair and...

Michael Bartholomew-Biggs

2004-06-29T23:59:59.000Z

205

BPAT Systems Maintenance - February 9, 2015  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CommitteesTeams Customer Training Interconnection Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 292015 BPAT's...

206

BPAT Systems Maintenance - December 12, 2014  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CommitteesTeams Customer Training Interconnection Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 12122014 BPAT's...

207

BPAT Systems Maintenance - November 5, 2014  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CommitteesTeams Customer Training Interconnection Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 1152014 BPAT's...

208

FAQS Reference Guide Facility Maintenance Management  

Broader source: Energy.gov [DOE]

This reference guide addresses the competency statements in the April 2014 edition of DOE Standard DOE-STD-1181-2014, Facility Maintenance Management Functional Area Qualification Standard.

209

Scheduling with Fixed Maintenance, Shared Resources and ...  

E-Print Network [OSTI]

Nov 30, 2014 ... Scheduling with Fixed Maintenance, Shared Resources and Nonlinear Feedrate Constraints: a Mine Planning Case Study. Christina N Burt...

Christina N Burt

2014-11-30T23:59:59.000Z

210

Risk Based Maintenance Optimization using Probabilistic Maintenance Quantification Models of Circuit Breaker  

E-Print Network [OSTI]

is carried to understand the importance of model parameters in obtaining optimal maintenance strategies. The analysis covers the effect of inspection rate calculated for each stage and its impact on failure probability, inspection cost, maintenance cost...

Natti, Satish

2010-01-14T23:59:59.000Z

211

Section 6 -Facilities Usage and Maintenance A. Facilities Usage and Maintenance  

E-Print Network [OSTI]

Section 6 - Facilities Usage and Maintenance A. Facilities Usage and Maintenance 1 be held financially responsible. Financial responsibility extends to abandoned belongings, excessive is not permitted under any circumstances. Storage facilities are provided in most student housing units for storing

Pantaleone, Jim

212

Project Year Project Title  

E-Print Network [OSTI]

the cost of the project to labor only. The efficacy of the examples will be assessed through their useProject Year 2012-2013 Project Title Sight-Reading at the Piano Project Team Ken Johansen, Peabody) Faculty Statement The goal of this project is to create a bank of practice exercises that student pianists

Gray, Jeffrey J.

213

Project Year Project Team  

E-Print Network [OSTI]

design goals for this project include low cost (less than $30 per paddle) and robustness. The projectProject Year 2001 Project Team Faculty: Allison Okamura, Mechanical Engineering, Whiting School Project Title Haptic Display of Dynamic Systems Audience 30 to 40 students per year, enrolled

Gray, Jeffrey J.

214

Project Year Project Team  

E-Print Network [OSTI]

-year section of the summer project will cost $1344.) This project will be measured by the CER surveys conductedProject Year 2005 Project Team Sean Greenberg, Faculty, Philosophy Department, Krieger School of Arts & Sciences; Kevin Clark, Student, Philosophy Department, Krieger School of Arts & Sciences Project

Gray, Jeffrey J.

215

Environmental Survey Report for the ETTP: Environmental Management Waste Management Facility (EMWMF) Haul Road Corridor, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This report summarizes the results of environmental surveys conducted within the corridor of a temporary haul road (''Haul Road'') to be constructed from East Tennessee Technology Park (ETTP) to the Environmental Management Waste Management Facility (EMWMF) located just west of the Y-12 National Security Complex (Y-12). Environmental surveys were conducted by natural resource experts at Oak Ridge National Laboratory who routinely assess the significance of various project activities on the Oak Ridge Reservation (ORR). ORNL assistance to the Haul Road Project included environmental assessments necessary to determine the best route for minimizing impacts to sensitive resources such as wetlands or rare plants. Once the final route was chosen, environmental surveys were conducted within the corridor to evaluate the impacts to sensitive resources that could not be avoided. The final Haul Road route follows established roads and a power-line corridor to the extent possible (Fig. 1). Detailed explanation regarding the purpose of the Haul Road and the regulatory context associated with its construction is provided in at least two major documents and consequently is not presented here: (1) Explanation of Significant Differences for the Record of Decision for the Disposal of Oak Ridge Reservation Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Waste, Oak Ridge, Tennessee (January 2005, DOE/OR/01-2194&D2), and (2) Environmental Monitoring Plan for The ETTP to EMWMF Haul Road for the Disposal of Oak Ridge Reservation Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Waste, Oak Ridge, Tennessee (April 2005, BJC/OR-2152). The focus of this report is a description of the sensitive resources to be impacted by Haul Road construction. Following a short description of the methods used for the environmental surveys, results and observations are presented in the following subsections: (1) General description of the affected environment; (2) Rare plants and vegetation assemblages; (3) Rare wildlife and their habitat; (4) Rare aquatic species; and (5) Wetlands/Floodplains. A summary of project actions taken or planned in order to avoid, minimize, or mitigate the environmental impacts associated with this project are summarized in the conclusion section of this report.

Peterson, M.J.

2005-12-20T23:59:59.000Z

216

Vehicle Maintenance Procedure Outline the procedure for vehicle maintenance at University of Michigan (U-M).  

E-Print Network [OSTI]

Vehicle Maintenance Procedure Objective Outline the procedure for vehicle maintenance at University of Michigan (U-M). Procedure 1. Your U-M vehicle has a mechanical and/or safety issue. 2. Contact Garage of the vehicle or if needed, have the vehicle towed to the maintenance facility. 4. If a loaner is needed while

Kirschner, Denise

217

Deactivation, Decontamination and Decommissioning Project Summaries  

SciTech Connect (OSTI)

This report is a compilation of summary descriptions of Deactivation, Decontamination and Decommissioning, and Surveillance and Maintenance projects planned for inactive facilities and sites at the INEEL from FY-2002 through FY-2010. Deactivations of contaminated facilities will produce safe and stable facilities requiring minimal surveillance and maintenance pending further decontamination and decommissioning. Decontamination and decommissioning actions remove contaminated facilities, thus eliminating long-term surveillance and maintenance. The projects are prioritized based on risk to DOE-ID, the public, and the environment, and the reduction of DOE-ID mortgage costs and liability at the INEEL.

Peterson, David Shane; Webber, Frank Laverne

2001-07-01T23:59:59.000Z

218

A road map for implementing systems engineering  

SciTech Connect (OSTI)

Studies by academia, industry, and government indicate that applying a sound systems engineering process to development programs is an important tool for preventing cost and schedule overruns and performance deficiencies. There is an enormous body of systems engineering knowledge. Where does one start? How can the principles of systems engineering be applied in the Sandia environment? This road map is intended to be an aid to answering these questions.

Dean, F.F. [Sandia National Labs., Albuquerque, NM (United States). New Mexico Weapons Systems Engineering Center; Bentz, B.; Bahill, A.T. [Univ. of Arizona, Tucson, AZ (United States)

1997-02-01T23:59:59.000Z

219

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Louise Pasternack, Chemistry Department, Krieger School, Krieger School of Arts & Sciences Project Title Introductory Chemistry Lab Demonstrations Audience an interactive virtual lab manual that will facilitate understanding of the procedures and techniques required

Gray, Jeffrey J.

220

Void Fraction Instrument operation and maintenance manual  

SciTech Connect (OSTI)

This Operations and Maintenance Manual (O&MM) addresses riser installation, equipment and personnel hazards, operating instructions, calibration, maintenance, removal, and other pertinent information necessary to safely operate and store the Void Fraction Instrument. Final decontamination and decommissioning of the Void Fraction Instrument are not covered in this document.

Borgonovi, G.; Stokes, T.I.; Pearce, K.L.; Martin, J.D.; Gimera, M.; Graves, D.B.

1994-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Software Testing and Maintenance 1 Regression Testing  

E-Print Network [OSTI]

1 Software Testing and Maintenance 1 Regression Testing Introduction Test Selection Test Minimization Test Prioritization Summary Software Testing and Maintenance 2 What is it? Regression testing refers to the portion of the test cycle in which a program is tested to ensure that changes do not affect

Lei, Jeff Yu

222

Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.  

SciTech Connect (OSTI)

Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM&R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA`s power system. This document -- the 1992 OM&R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction`s critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA`s ability to accomplish its OM&R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

223

Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.  

SciTech Connect (OSTI)

Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA's power system. This document -- the 1992 OM R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction's critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA's ability to accomplish its OM R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

224

Functional Prognostic Architecture for the Maintenance of Complex Systems  

E-Print Network [OSTI]

their functions by new ones. In order to optimize the maintenance cost, it is necessary to perform preventive maintenance to prevent failure occur- rence. Preventive maintenance actions consist in replacing components the date of the next scheduled maintenance phase. In the classical case, preventive maintenance is only

Pencolé, Yannick

225

Diagnosis and prognosis for the maintenance of complex systems  

E-Print Network [OSTI]

--Diagnosis, prognosis, preventive maintenance, complex systems. I. INTRODUCTION Nowadays, system maintenance is a key to decrease the maintenance cost, it is necessary to perform preventive maintenance [3], [4], [5] which alsoDiagnosis and prognosis for the maintenance of complex systems Pauline Ribot1,2 , Yannick Pencol´e1

Pencolé, Yannick

226

EVLA Project Book, Chapter 5: Receivers EVLA Project Book, Chapter 5.  

E-Print Network [OSTI]

EVLA Project Book, Chapter 5: Receivers 1 EVLA Project Book, Chapter 5. 5 RECEIVERS (5 March 2009 14 CTI Incorporated model numbers. #12;EVLA Project Book, Chapter 5: Receivers 2 5.1 General the CTI model 22 refrigerator for load and temperature stability, long-term maintenance cost and over all

Groppi, Christopher

227

Canastota Renewable Energy Facility Project  

SciTech Connect (OSTI)

The project was implemented at the Madison County Landfill located in the Town of Lincoln, Madison County, New York. Madison County has owned and operated the solid waste and recycling facilities at the Buyea Road site since 1974. At the onset of the project, the County owned and operated facilities there to include three separate landfills, a residential solid waste disposal and recycled material drop-off facility, a recycling facility and associated administrative, support and environmental control facilities. This putrescible waste undergoes anaerobic decomposition within the waste mass and generates landfill gas, which is approximately 50% methane. In order to recover this gas, the landfill was equipped with gas collection systems on both the east and west sides of Buyea Road which bring the gas to a central point for destruction. In order to derive a beneficial use from the collected landfill gases, the County decided to issue a Request for Proposals (RFP) for the future use of the generated gas.

Blake, Jillian; Hunt, Allen

2013-12-13T23:59:59.000Z

228

Project Year Project Title  

E-Print Network [OSTI]

Project Year 2013-2014 Project Title German Online Placement Exam Project Team Deborah Mifflin to increased cost. As well, it lacked listening comprehension, writing and speaking components providing support, we will use Blackboard for this project. The creation will require numerous steps

Gray, Jeffrey J.

229

Project Year Project Title  

E-Print Network [OSTI]

that incorporate video taped procedures for student preview. Solution This project will create videos for more to study the procedure and techniques before coming to class. Our previous fellowship project addressedProject Year 2009 Project Title Enhancing Biology Laboratory Preparation through Video

Gray, Jeffrey J.

230

Project Year Project Team  

E-Print Network [OSTI]

, there is no resource available to view the procedure before class. Solution The purpose of this project is to capture available to view the procedure before class. The purpose #12;of this project is to capture variousProject Year 2007 Project Team Kristina Obom, Faculty, Advanced Academic Programs, Krieger School

Gray, Jeffrey J.

231

EDGEWOOD COUNTRY CLUB 100 CHURCHILL ROAD  

E-Print Network [OSTI]

. Position Available: 3rd Assistant Superintendent - $14.00 - $15.00 per hour II. Professional a unified design. Organize maintenance buildings and equipment storage ­ improve organization and Pesticide Management: Obtain and maintain a PA pesticide license through testing and yearly training

232

Optimization models for improving periodic maintenance schedules by utilizing opportunities  

E-Print Network [OSTI]

to this as preventive maintenance activities at an oppor- tunity. The original opportunistic replacement problemOptimization models for improving periodic maintenance schedules by utilizing opportunities Torgny of Technology Abstract We present mathematical models for finding optimal opportunistic maintenance schedules

Patriksson, Michael

233

Modelling maintenance for components under competing risk Helge Langseth  

E-Print Network [OSTI]

preventively maintained. The preventive maintenance (PM) is performed periodically with some period , but PMModelling maintenance for components under competing risk Helge Langseth Norwegian University the mathematical modelling of imperfect maintenance of a system under competing risk. The model we propose

Langseth, Helge

234

Condition-Based Maintenance via Simulation and a Targeted Bayesian  

E-Print Network [OSTI]

malfunctioning. Accordingly, it is essential to undertake an effective preventive maintenance (PM) policyCondition-Based Maintenance via Simulation and a Targeted Bayesian Network Metamodel Aviv Gruber, Israel ABSTRACT Condition-based maintenance (CBM) is increasingly applied to operational systems

Ben-Gal, Irad E.

235

Limited Commercial Maintenance (LCLM) Limited Lawn & Ornamental (LLO)  

E-Print Network [OSTI]

, Limited Commercial Landscape Maintenance, Ornamental & Turf, Private Ag, or General Standards CORE for Limited Commercial Landscape Maintenance (LCLM), you must attend all day to earn the 6 CEUs required. Limited Commercial Maintenance (LCLM) Limited Lawn & Ornamental (LLO) Training & Exams Date

Florida, University of

236

Maintenance Management Program for DOE Nuclear Facilities  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To define the program for the management of cost-effective maintenance of Department of Energy (DOE) nuclear facilities. Guidance for compliance with this Order is contained in DOE G 433.1-1, Nuclear Facility Maintenance Management Program Guide for use with DOE O 433.1, which references Federal regulations, DOE directives, and industry best practices using a graded approach to clarify requirements and guidance for maintaining DOE-owned Government property. (Cancels DOE 4330.4B, Chapter II, Maintenance Management Program, dated 2-10-94.) Cancels DOE 4330.4B (in part). Canceled by DOE O 433.1A.

2001-06-01T23:59:59.000Z

237

approach roads: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

The Data Science Institute at Columbia University strives to be the single world Columbia University 8 ROADS Grant Provost Ignition Funding Opportunity "Research Opportunities and...

238

Climate policies for road transport revisited (I): Evaluation...  

Open Energy Info (EERE)

of the current framework Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Climate policies for road transport revisited (I): Evaluation of the current framework...

239

Lawn Maintenance/Landscape Positions (Macomb/Oakland) DeClark's Landscaping Inc., a growing company and leader in the Green Industry for 30 yrs, is seeking  

E-Print Network [OSTI]

Lawn Maintenance/Landscape Positions (Macomb/Oakland) DeClark's Landscaping Inc., a growing company clients. These are full time positions with competitive wages. -Grounds Maintenance Sales/Supervisor -Landscape Project Manager -Certified Arborist -Lawn Technician (Certified 3A) -Landscape Foreman -Landscape

240

CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope...  

Broader source: Energy.gov (indexed) [DOE]

Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor February 2007 A section of...

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope...  

Broader source: Energy.gov (indexed) [DOE]

Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR...

242

FY 2014 Real Property Data Related to Operations and Maintenance...  

Office of Environmental Management (EM)

FY 2014 Real Property Data Related to Operations and Maintenance Guidance FY 2014 Real Property Data Related to Operations and Maintenance Guidance FY2014DataRelatedtoOperatio...

243

Maintenance expo................... 3 Georgia visitors....................... 3  

E-Print Network [OSTI]

Inside Maintenance expo................... 3 Georgia visitors....................... 3 Fluid Power Center ................ 4 CTS services Web page .......... 4 A monthly report on transportation transformation of nation's transportation policy The results of a 13-month study led by David Kittelson

Minnesota, University of

244

Risk impact of maintenance program changes  

E-Print Network [OSTI]

This study quantifies the change in one measure of plant risk, the frequency of loss of long-term decay heat removal, due to changes in maintenance at the James A. Fitzpatrick (JAF) plant. Quantification is accomplished ...

Credit, Kimberly A. (Kimberly April)

1992-01-01T23:59:59.000Z

245

Operations and Maintenance for Major Equipment Types  

Broader source: Energy.gov [DOE]

Equipment lies at the heart of all operations and maintenance (O&M) activities. This equipment varies greatly across the Federal sector in age, size, type, model, condition, etc.

246

Significantly reduce maintenance time Documents&Mediabecomesthekey  

E-Print Network [OSTI]

Significantly reduce maintenance time Documents&Mediabecomesthekey contactforallmaintenanceneeds. MajorpartsarestoredbyDocuments& MediaattheMissionCenter.Thisreduces thetimeneededtoorderpartsandresultsin&Mediaoffersthecampus communityaconvenientandeconomicsolution foritscopiers,multifunctiondevicesandprinter needs. Print Management Program advantages Reduce

Mullins, Dyche

247

Pressure maintenance in a volatile oil reservoir  

E-Print Network [OSTI]

PRESSURE MAINTENANCE IN A VOLATILE OIL RESERVOIR A Thesis BRUCE ALAN SCHUSTER Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE May, 1989 Major... Subject: Petroleum Engineering PRESSURE MAINTENANCE IN A VOLATILE OIL RESERVOIR A Thesis BRUCE ALAN SCHUSTER Approved as to style and content by: S. A. Holditch (Chair of Committee) W. J. Lee (Member) R. R, Berg (Member) , Jz W. D. Von Gonten...

Schuster, Bruce Alan

1989-01-01T23:59:59.000Z

248

Thermography for Preventive Maintenance and Conservation  

E-Print Network [OSTI]

THERMOGRAPHY FOR PREVENTIVE MAINTENANCE AND CONSERVATION Tony Lopez Southern California Gas Company Los Angles, California The Supply Situation With fuel prices soaring, more and more companies are looking at energy management as a means... years. In the last twenty years, however, other applica tions have been developed for thermography. Some of these include: medicine, nondestructive testi:ng, aerial land mapping, preventive maintenance and conservation. The balance of this paper...

Lopez, T.

1979-01-01T23:59:59.000Z

249

Road traffic accidents in Kathmanduan hour of education yields a glimmer of hope  

E-Print Network [OSTI]

et al. : Road traffic accidents in Kathmandu an hour ofOpen Access Road traffic accidents in Kathmanduan hour ofnumber of road traffic accidents in the year 2012 decreased

Basnet, Bibhusan; Vohra, Rais; Bhandari, Amit; Pandey, Subash

2013-01-01T23:59:59.000Z

250

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Gregory Hager, Computer Science, Whiting School of Engineering Fellow: Alan Chen, Biomedical Engineering, Whiting School of Engineering Project Title Robotics is complicated, time-consuming, and costly, making a robot for an introductory-level class is not practical

Gray, Jeffrey J.

251

Project Proposal Project Logistics  

E-Print Network [OSTI]

Project Proposal · Project Logistics: ­ 2-3 person teams ­ Significant implementation, worth 55 and anticipated cost of copying to/from host memory. IV. Intellectual Challenges - Generally, what makes this computation worthy of a project? - Point to any difficulties you anticipate at present in achieving high

Hall, Mary W.

252

Project Year Project Title  

E-Print Network [OSTI]

operators, matrix indexing, vector computations, loops, functions, and plotting graphs, among others basic arithmetic operators, matrix indexing, and vector computations in MATLAB. After creatingProject Year 2011-2012 Project Title Online Tutorial for MATLAB Project Team Eileen Haase, Whiting

Gray, Jeffrey J.

253

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2005 Project Team Krysia Hudson, Faculty, School of Nursing, Undergraduate Instruction for Educational Resources Project Title Enhanced Web-based Learning Environments for Beginning Nursing Students (e.g., demonstrations of procedures or tasks) into the WBL systems, it will be possible to increase

Gray, Jeffrey J.

254

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Michael McCloskey, Cognitive Science/Neuroscience, Krieger of Arts & Sciences Project Title Cognitive Neuropsychology Audience The initial audience to access. The current procedure calls for individual students or researchers to contact the faculty member

Gray, Jeffrey J.

255

Project X  

E-Print Network [OSTI]

administrative procedures. Efficiency of maintenance,a partial optimization procedure. The flux of cold neutronsrecorded in the simulation procedure. Each traced neutron

Holmes, Steve

2014-01-01T23:59:59.000Z

256

A Decade of On-road Emissions Measurements  

E-Print Network [OSTI]

A Decade of On-road Emissions Measurements G A R Y A . B I S H O P * A N D D O N A L D H . S T E D. A multiyear, on-road emission measurement program carried outinthecitiesofChicago,Illinois;Denver,Colorado;LosAngeles (LA), California; and Phoenix, Arizona shows large, fuel- specific tailpipe emissions reductions

Denver, University of

257

13th Annual Transportation Engineering and Road Research Alliance (TERRA)  

E-Print Network [OSTI]

13th Annual Sponsor: Transportation Engineering and Road Research Alliance (TERRA) Cosponsors: Minnesota Department of Transportation (Mn/DOT) Minnesota Local Technical Assistance Program (LTAP Association State Aid for Local Transportation, Mn/DOT Minnesota Local Road Research Board (LRRB) Pavement

Minnesota, University of

258

Introduction Fossil fuel combustion by aviation, shipping and road  

E-Print Network [OSTI]

fifth of the total global anthropogenic emissions of CO2. These emissions are growing more rapidly than to global CO emissions are estimated to be much smaller, likely due to more efficient fuel combustion. Road96 Introduction Fossil fuel combustion by aviation, shipping and road traffic contributes about one

Haak, Hein

259

Lessons Learned from Failures Involving Geofoam in Roads and Embankments  

E-Print Network [OSTI]

Lessons Learned from Failures Involving Geofoam in Roads and Embankments Manhattan College Research July 1999) #12;Lessons Learned from Failures Involving Geofoam in Roads and Embankments Manhattan College Research Report No. CE/GE-99-1 ii This page intentionally left blank. #12;Lessons Learned from

Horvath, John S.

260

MINNESOTA ROAD FEE TEST MILEAGE BASED USER FEE RATE  

E-Print Network [OSTI]

Policy Center Oregon Road User Fee Pilot Program Other Interest: Nevada, Texas, Ohio, Idaho, etc. May Cellular Tower Data Warehouse May 24, 2012 6 #12;Determination of Mileage Fees · MBUF Rate StructureMINNESOTA ROAD FEE TEST MILEAGE BASED USER FEE RATE STRUCTURE CONCEPT 23rd Annual Transportation

Minnesota, University of

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Predictability of road traffic and congestion in urban areas  

E-Print Network [OSTI]

Mitigating traffic congestion on urban roads, with paramount importance in urban development and reduction of energy consumption and air pollution, depends on our ability to foresee road usage and traffic conditions pertaining to the collective behavior of drivers, raising a significant question: to what degree is road traffic predictable in urban areas? Here we rely on the precise records of daily vehicle mobility based on GPS positioning device installed in taxis to uncover the potential daily predictability of urban traffic patterns. Using the mapping from the degree of congestion on roads into a time series of symbols and measuring its entropy, we find a relatively high daily predictability of traffic conditions despite the absence of any a priori knowledge of drivers' origins and destinations and quite different travel patterns between weekdays and weekends. Moreover, we find a counterintuitive dependence of the predictability on travel speed: the road segment associated with intermediate average travel ...

Wang, Jingyuan; Li, Jing; Li, Chao; Xiong, Zhang; Wang, Wen-Xu

2014-01-01T23:59:59.000Z

262

E-Print Network 3.0 - access roads rehabilitation Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Station - Flagstaff Lab Collection: Environmental Sciences and Ecology 15 University of Kings Edwards Summary: . Bournbrook Road The road will be closed to vehicular traffic...

263

E-Print Network 3.0 - automatic road extraction Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

with no tuning, as well as extracting the road midline using residual... and watershed image processing techniques to extract a road network in the vicinity of the vehicle,...

264

The Private Provision of Frontier Infrastructure: Toll Roads in California, 1850-1902  

E-Print Network [OSTI]

and Gold Run (1867), Weaverville and Minersville (1863), andwho controlled the Weaverville & Shasta Wagon Road and thea large interest in the Weaverville & Minersville Toll Road.

Klein, Daniel B.; Yin, Chi

1994-01-01T23:59:59.000Z

265
266

Towards a maintenance and servicing indicator Pascal Vrignat 1  

E-Print Network [OSTI]

: Preventive Maintenance, Maintenance planning, Hidden Markov Model, Failure detection. 1 Introduction, events may be prevented by applying a correct maintenance policy. Some tankers may not have sunk if some maintenance had been correctly applied. Factory should not have exploded with some preventive control

Boyer, Edmond

267

Kernel spectral clustering for predicting maintenance of industrial machines  

E-Print Network [OSTI]

to deal with sensory faults have been used [1],[2],[3]: corrective maintenance, preventive maintenance the machine fails, it is expensive and safety and environment issues arise. Preventive maintenance is basedKernel spectral clustering for predicting maintenance of industrial machines Rocco Langone1, Carlos

268

Grouping maintenance strategy with availability constraint under limited  

E-Print Network [OSTI]

with significant assumptions: maintenance durations are neglected and only one preventive maintenance for eachGrouping maintenance strategy with availability constraint under limited repairmen Phuc Do Van Hai maintenance strategies of multi-component systems by integrating two efficient optimization algorithms

Paris-Sud XI, Université de

269

Performance evaluation of centralized maintenance workshop by using Queuing Networks  

E-Print Network [OSTI]

maintenance types: Preventive maintenance: different actions are programmed in cycle periods; CorrectivePerformance evaluation of centralized maintenance workshop by using Queuing Networks Zineb Simeu: Maintenance workshop integrated in the job-shop system is required in order to maintain the production

Paris-Sud XI, Université de

270

Maintenance and long life of manjemen & pengelolaan dan  

E-Print Network [OSTI]

: SACA&D Maintenance ­ p.6 #12;ensure operability What does this mean? · preventive maintenanceMaintenance and long life of SACA&D manjemen & pengelolaan dan umur panjang Gerard van der Schrier KNMI BMKG: SACA&D Maintenance ­ p.1 #12;Why SACA&D extreme weather and food security Jakarta Post, 10

Stoffelen, Ad

271

Comparison of Selected Model Evaluation Criteria for Maintenance Applications  

E-Print Network [OSTI]

, Louisville, KY 40292, USA Model-based preventive maintenance relies on creating models that can either loss, and as a whole a sluggish system, the focus has shifted to preventive maintenance. Computerized maintenance systems aid in improving the efficiency of maintenance tasks [28]. The approach of preventive

Huang, Samuel H.

272

Optimal Maintenance Scheduling of a Gas Engine Power Plant  

E-Print Network [OSTI]

to carry out preventive maintenance at regular intervals19 . The maintenance schedule affects many short1 Optimal Maintenance Scheduling of a Gas Engine Power Plant using Generalized Disjunctive with parallel units. Gas engines are shutdown according to a regular maintenance plan that limits the number

Grossmann, Ignacio E.

273

maintenance. This research is relevant to opera-tions and maintenance challenges facing aging  

E-Print Network [OSTI]

the need for preventive maintenance or other diagnostic activities on the physical system. Simulationsmaintenance. This research is relevant to opera- tions and maintenance challenges facing aging-benefit of extending the time between overhauls. reducing the probability of a failure in the field. and preventive

274

Project Name Work Description -as Approv Aug 09 Anchorage Harbor,  

E-Print Network [OSTI]

; perform energy upgrades; replace underground fuel tank and heating system to meet Environmental CompliancePrimary State Corps District Project Name Work Description - as Approv Aug 09 Planned Allocation excessive maintenance. Reduces future maintenance costs. 1,000,000 AL Mobile Alabama River Lakes, AL Award 8

US Army Corps of Engineers

275

Savannah River Site 1991 Road Erosion Inventory.  

SciTech Connect (OSTI)

Final Report. USDA Forest Service, Savannah River, Aiken, SC. 28 pp. Abstract - This paper explains the rationale and results of a 1991 road erosion inventory conducted by members of the USDA Forest Service Savannah River (FS-SR) and USDA Natural Resources Conservation Service (NRCS). The inventory provided information for the Department of Energy - Savannah River (DOE-SR) to justify the need for developing an erosion and sediment control program with appropriate funding, personnel, and equipment. Federally managed since the early 1950s, the SRS is located on 198,344 acres (80,301 hectares) in the South Carolina counties of Aiken, Barnwell, and Allendale. Located along the eastern border of the Savannah River, the SRS is located within the Upper and Lower Coastal Plains of South Carolina.

Jones, Cliff.

2007-06-22T23:59:59.000Z

276

MSRIP 2014 Faculty Research Projects The following faculty research projects are organized by colleges, and then  

E-Print Network [OSTI]

. Anderson Graduate School of Management Management Faculty Mentor: Dr. Ye Li Research Setting: Lab and Field and Technology (CE-CERT) Faculty Mentor: Dr. Kanok Boriboonsomsin Research Setting: Lab Research Project: Dr the inventorying methods of on-road mobile emissions, evaluating strategies to reduce greenhouse gases from surface

Reed, Christopher A.

277

Gregg Hall 35 Colovos Road Durham, New Hampshire 03824-3534 http://www.unh.edu/erg/cstev/ Gregg Hall 35 Colovos Road Durham, New Hampshire 03824-3534 http://www.unh.edu/erg/cstev/  

E-Print Network [OSTI]

Control · Water Quality Treatment · Recharges Groundwater · Reduction in Stormwater Infrastructure (Piping · Proper Soil Stabilization and Erosion Control are Required to Prevent Clogging · Quality Control-Days After Installation Cost & Maintenance Total Project Cost is Comparable for Pervious Concrete

278

Building a comprehensive suite of technologies on the World Wide Web for the Pathfinder project  

E-Print Network [OSTI]

This paper describes the development of an informational and educational web site supporting the Pathfinder maintenance project. Our premise is that as the project progresses, all participants have a need for information concerning the rest...

Graham, Scott Allen

2000-01-01T23:59:59.000Z

279

Apply reliability centered maintenance to sealless pumps  

SciTech Connect (OSTI)

This paper reports on reliability centered maintenance (RCM) which is considered a crucial part of future reliability engineering. RCM determines the maintenance requirements of plants and equipment in their operating context. The RCM method has been applied to the management of critical sealless pumps in fire/toxic risk services, typical of the petrochemical industry. The method provides advantages from a detailed study of any critical engineering system. RCM is a team exercise and fosters team spirit in the plant environment. The maintenance strategy that evolves is based on team decisions and relies on maximizing the inherent reliability built into the equipment. RCM recommends design upgrades where this inherent reliability is being questioned. Sealless pumps of canned motor design are used as main reactor charge pumps in PVC plants. These pumps handle fresh vinyl chloride monomer (VCM), which is both carcinogenic and flammable.

Pradhan, S. (Exxon Chemicals Canada, Ontario (Canada))

1993-01-01T23:59:59.000Z

280

A Formal Ontology for Industrial Maintenance Mohamed Hedi KARRAY*, Brigitte CHEBEL-MORELLO*, Noureddine ZERHOUNI*  

E-Print Network [OSTI]

- ing to different strategies (preventive maintenance, predictive maintenance, correc- tive maintenanceA Formal Ontology for Industrial Maintenance Mohamed Hedi KARRAY*, Brigitte CHEBEL of information and communication technol- ogies has resulted in a variety of maintenance support systems

Paris-Sud XI, Université de

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Maintenance strategies to improve sootblower availability  

SciTech Connect (OSTI)

Sootblowers are electromechanical devices used for removal of ash and slag deposits from boiler tube surfaces. By directing steam, air, or water cleaning medium through a nozzle to remove deposits from boiler tubes, boilers are kept on-line for longer periods of time reducing the need for outages to clean the boiler by mechanical means. Fuel must be burned efficiently to minimize stagging and fouling of the heat transfer surfaces. Tuning the boiler to maximize combustion efficiency should not be limited to optimizing fuel conditions, air-fuel ratios, firing rates, excess air, and over-fire air, but should also include the use of sootblowers. The goal is to know when to clean, and if the cleaning cycle has effectively removed the deposit and increased heat transfer. Today, boiler cleaning technology not only focuses on the impact of the sootblowing system on overall boiler performance, but it also focuses on design improvements that impact an individual sootblower`s performance. Proper sootblower maintenance is an integral part of making existing designs and new designs work. Existing computer technologies provide a viable means of documenting and trending sootblower performance data and maintenance history. The personal computer and the availability of spreadsheet and database software make the task of quantifying sootblower performance data and maintenance history easier to achieve. The difficult task is gathering the proper data to make decisions about sootblowing operations and maintenance. The balance of this paper will discuss typical maintenance practices, and improvements that can be achieved by documenting sootblowing system inspections and maintenance activity using a personal computer database.

Walther, J.M.; Whitehead, B.K.

1996-07-01T23:59:59.000Z

282

Steam Trap Maintenance as a Profit Center  

E-Print Network [OSTI]

the Eighteenth Industrial Energy Technology Conference, Houston, TX, April 17-18, 1996 EXCUSES Everybody thinks his or her steam trap maintenance is good. Surveysl have shown the following are the most popular excuses encountered when managers are confronted... for steam traps. 192 ESL-IE-96-04-28 Proceedings from the Eighteenth Industrial Energy Technology Conference, Houston, TX, April 17-18, 1996 5. Set up a trap maintenance program C. Prepare and present a report to that will: management on the results...

Bouchillon, J. L.

283

Microsoft Word - CX-HeboSubstationA- FY13_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

Todd Nicholson Supervisory Civil Engineer - TELF-TPP-3 Proposed Action: Hebo Substation Access Road Maintenance Budget Information: Work Order 00270316 PP&A Project No.: 2784...

284

Project Year Project Title  

E-Print Network [OSTI]

Project Year 2011-2012 Project Title Using M-Health and GIS Technology in the Field to Improve-specialized, but practically useless skill. Solution One goal of this summer's Applied Geographic Information Systems in Public lessons about observational epidemiology. Technologies Used Geographic Info System (GIS), Blackboard

Gray, Jeffrey J.

285

BuildingName The Description of the Project  

E-Print Network [OSTI]

SECTION 012900 ­ PAYMENT PROCEDURES SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION SECTION 013200 PROCEDURES SECTION 017823 ­ OPERATION AND MAINTENANCE MANUALS SECTION 019100 ­ FULL PROJECT COMMISSIONINGBuildingName The Description of the Project P00000000 0000 DOCUMENTS SPECIFICATION DIVISION 1

Kamat, Vineet R.

286

ASBESTOS PROJECT MANAGEMENT University of California, San Diego  

E-Print Network [OSTI]

in advance if the renovation and demolition project with friable asbestos-containing materials is over 1601 ASBESTOS PROJECT MANAGEMENT University of California, San Diego UC San Diego project managers to maintenance, repair, and construction of UC-owned and leased buildings where asbestos-containing materials

Aluwihare, Lihini

287

Project Accounts  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Accounts Project Accounts Overview Project accounts are designed to facilitate collaborative computing by allowing multiple users to use the same account. All actions...

288

M.-T. DO, P. MARSAC, Y. DELANNE Prediction of Tire/Wet Road Friction from  

E-Print Network [OSTI]

M.-T. DO, P. MARSAC, Y. DELANNE 1 Prediction of Tire/Wet Road Friction from Road Surface, validation of a contact model for the prediction of low-speed friction from road surface microtexture the friction ­ speed curve from road- and tire measurable parameters. The model development is briefly

Paris-Sud XI, Université de

289

2009 Voluntary Protection Programs Participants' Association (VPPPA) Presentation: Follow The Yellow Brick Road to Safety  

Broader source: Energy.gov [DOE]

2009 Voluntary Protection Programs Participants' Association (VPPPA) Presentation: Follow The Yellow Brick Road to Safety

290

ICD Complex Operations and Maintenance Plan  

SciTech Connect (OSTI)

This Operations and Maintenance (O&M) Plan describes how the Idaho National Laboratory (INL) conducts operations, winterization, and startup of the Idaho CERCLA Disposal Facility (ICDF) Complex. The ICDF Complex is the centralized INL facility responsible for the receipt, storage, treatment (as necessary), and disposal of INL Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) remediation waste.

Gibson, P. L.

2007-06-25T23:59:59.000Z

291

Facilities Cost Pool: Maintenance Service Responsibilities  

E-Print Network [OSTI]

C 16 EXTERIOR LANDSCAPING University Standard FM FM C 17 EXTERIOR STD BUILDING SIGNS FM FM FM FM FMD 22 DATA POINT MONITORING Environmental building standard FM FM C Cost Pool: Maintenance Service Responsibilities 2 Table of Contents 3 Building Shell

Gulliver, Robert

292

Wind Energy Facility Reliability and Maintenance  

E-Print Network [OSTI]

Wind Energy Facility Reliability and Maintenance Eunshin Byon, Lewis Ntaimo, Chanan Singh and Yu related to wind energy facility reliability and mainte- nance focused more on qualitative aspects. In this chapter, we provide a comprehensive account of the existing research regarding wind energy facility

Ding, Yu

293

Reliable Link Maintenance in Cognitive Radio Systems  

E-Print Network [OSTI]

resources and overcome the under-utilization of licensed spectrum. Since the licensed user still keeps) have to vacate the spectrum in case the licensed user claims it. In order to maintain the qualityReliable Link Maintenance in Cognitive Radio Systems Daniel Willkomm, James Gross and Adam Wolisz

Gross, James

294

Distributing Urea for the On-Road Vehicle Market  

Broader source: Energy.gov (indexed) [DOE]

Urea for the On-Road Vehicle Market Estimated Urea Consumption Several Light- and Heavy-Duty EngineVehicle Manufacturers Have Selected SCR as Their NOx Control Strategy *...

295

State of roads : public works as research, India circa 1960  

E-Print Network [OSTI]

That the road is a symbol of the prowess of the nation-state seems tautological, a uni"ed phenomenon of political symbolism that manifests as an infrastructural network. When subjected to a close historical examination, ...

Khorakiwala, Ateya A

2009-01-01T23:59:59.000Z

296

One Woman's Road to Recovery | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

19, 2010 - 6:04pm Addthis One Woman's Road to Recovery Jo Napolitano Media Specialist, Argonne National Laboratory Editor's Note: Cross-posted from Argonne National Lab's Portraits...

297

Science Education on the Road: 2013 Princeton University Community...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Science Education on the Road: 2013 Princeton University Community and Staff Day October 12, 2013 Gallery: It was a beautiful autumn day in Princeton, NJ. As tailgaters got ready...

298

Linear Road : benchmarking stream-based data management systems  

E-Print Network [OSTI]

This thesis describes the design, implementation, and execution of the Linear Road benchmark for stream-based data management systems. The motivation for benchmarking and the selection of the benchmark application are ...

Tibbetts, Richard S. (Richard Singleton), 1979-

2003-01-01T23:59:59.000Z

299

New priorities for old roads : re-thinking roadway preservation  

E-Print Network [OSTI]

Most of the roads built over the last century in the US were built assuming that efficient mobility for drivers was most important without considering impacts to the natural or built environment. Urban neighborhoods were ...

Sylvester, Kathleen R. (Kathleen Rynn)

2009-01-01T23:59:59.000Z

300

Where the Rubber Meets the Road -- the Alternative Fuel Station...  

Broader source: Energy.gov (indexed) [DOE]

Road -- the Alternative Fuel Station Locator August 10, 2010 - 2:32pm Addthis Dennis A. Smith Director, National Clean Cities Last week, this blog highlighted the highly efficient...

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Global Energy Partners, LLC 500 Ygnacio Valley Road, Suite 450  

E-Print Network [OSTI]

Global Energy Partners, LLC 500 Ygnacio Valley Road, Suite 450 Walnut Creek, CA 94596 P: 925. This report was prepared by Global Energy Partners, LLC 500 Ygnacio Valley Blvd., Suite 450 Walnut Creek, CA

302

Online Monitoring to Enable Improved Diagnostics, Prognostics and Maintenance  

SciTech Connect (OSTI)

For both existing and new plant designs there are increasing opportunities and needs for the application of advanced online surveillance, diagnostic and prognostic techniques. These methods can continuously monitor and assess the health of nuclear power plant systems and components. The added effectiveness of such programs has the potential to enable holistic plant management, and minimize exposure to future and unknown risks. The 'NDE & On-line Monitoring' activities within the Advanced Instrumentation, Information and Control Systems (II&CS) Pathway are developing R&D to establish advanced condition monitoring and prognostics technologies to understand and predict future phenomena, derived from plant aging in systems, structures, and components (SSC). This research includes utilization of the enhanced functionality and system condition awareness that becomes available through the application of digital technologies at existing nuclear power plants for online monitoring and prognostics. The current state-of-the-art for on-line monitoring applied to active components (eg pumps, valves, motors) and passive structure (eg core internals, primary piping, pressure vessel, concrete, cables, buried pipes) is being reviewed. This includes looking at the current deployment of systems that monitor reactor noise, acoustic signals and vibration in various forms, leak monitoring, and now increasingly condition-based maintenance (CBM) for active components. The NDE and on-line monitoring projects are designed to look beyond locally monitored CBM. Current trends include centralized plant monitoring of SSC, potential fleet-based CBM and technology that will enable operation and maintenance to be performed with limited on-site staff. Attention is also moving to systems that use online monitoring to permit longer term operation (LTO), including a prognostic or predictive element that estimates a remaining useful life (RUL). Many, if not all, active components (pumps, valves, motors etc.) can be well managed, routinely diagnosed, analyzed and upgraded as needed using a combination of periodic and online CBM. The ability to successfully manage passive systems and structures is seen as the key to LTO, particularly in the USA. New approaches will be demonstrated, including prognostics for passive structures, which is critical to maintaining safety and availability and to reducing operations and maintenance costs for NPP's. To provide proactive on-line monitoring that includes estimates for RUL new projects will include advanced sensors, better understanding of stressors and challenges faced in quantification of uncertainty associated with RUL. This program area will leverage insights from past experience in other industries and seek to demonstrate the feasibility of on-line monitoring and prognostics to support NPP LTO.

Bond, Leonard J.

2011-02-01T23:59:59.000Z

303

Energy Conservation Thru Steam Trap Surveys and Preventive Maintenance Programs  

E-Print Network [OSTI]

ENERGY CONSERVATION THRU STEAM TRAP SURVEYS AND PREVENTIVE MAINTENANCE PROGRAMS Terry Boynton, Armstrong, Three Rivers, Mich. Bob Dewhirst, Armstrong, New Braunfels, Texas. This paper will deal with steam trap surveys and preventive maintenance...

Boynton, T.; Dewhirst, B.

1980-01-01T23:59:59.000Z

304

WINCO maintenance before and after DOE 4330.4A  

SciTech Connect (OSTI)

This report discusses numerous elements of the maintenance program at the Idaho Chemical Processing Plant (ICPP) which have undergone changes during the last 5 years. Looking back, many of the maintenance program changes prior to 1991 were fragmented. Maintenance program elements were being ratcheted to address specific productivity and safety concerns. The improvements were warranted, but often improvements were implemented without a systematic review of how they impacted other maintenance program elements. After 1990 when WINCO began using the Chapter II guidelines of DOE Order 4330.4A as a maintenance program model, there was a marked improvement in the quality of the maintenance program changes. The post 1990 changes have been part of a systematic plan that has been communicated to all of the maintenance players. The Chapter II guidelines and the maintenance implementation plan (MIP) personnel with a focus for improvement that was missing prior to 1991.

Remsburg, R.E.

1993-04-27T23:59:59.000Z

305

Operations & Maintenance Best Practices Guide: Release 3.0  

Broader source: Energy.gov [DOE]

Guide covers version 3.0 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

306

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Project Fact Sheet Project Brief: Construction Project Team: Project Facts & Figures: Budget: £500,000 Funding Source: Capital Construction Project Programme: Start on Site: October 2010 End Date : April 2011 Occupation Date: n/a For further information contact Project Manager as listed above or the Imperial College

307

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Project Fact Sheet Project Brief: This project refurbished half of the 5th and 7th floors on the Faculty of Medicine, please visit: http://www1.imperial.ac.uk/medicine/ Construction Project Team: Project Facts & Figures: Budget: £3,500,000 Funding Source: SRIF III Construction Project Programme: Start

308

E-Print Network 3.0 - analyzing maintenance strategies Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

OR I GI NAL AR T I C LE Summary: OSA-CBM Preventive maintenance Reliability-centered maintenance 1 Maintenance strategies... and motivations for health monitoring The...

309

Modelling of dependence between critical failure and preventive maintenance  

E-Print Network [OSTI]

Modelling of dependence between critical failure and preventive maintenance: The repair alert model, or a preventive maintenance (PM) action, where the latter will prevent the failure. It is reasonable to expect that the failure can be avoided by a possible preventive maintenance (PM) at some random time Z. If Z

Langseth, Helge

310

A MAINTENANCE MODEL FOR COMPONENTS EXPOSED TO SEVERAL FAILURE MECHANISMS  

E-Print Network [OSTI]

. The preventive maintenance (PM) is performed periodically with some fixed period , but PM can also be performed describe the "goodness" of the maintenance crew; their ability to prevent failures by performing thorough is assumed to undergo preventive maintenance (PM), usually at fixed time periods > 0. In addition

Langseth, Helge

311

Maintenance policy: degradation laws versus Hidden Markov Model availability indicator  

E-Print Network [OSTI]

INTRODUCTION Industrial processes need to be maintained to prevent breakdown. Some years ago, maintenance, logistic... Different kinds of maintenance policy can be applied: preventive or corrective according to manager strategies. In case of preventive maintenance, different strategies should be used like planned

Paris-Sud XI, Université de

312

Modelling of dependence between critical failure and preventive maintenance  

E-Print Network [OSTI]

Modelling of dependence between critical failure and preventive maintenance: The repair alert model, or a preventive maintenance (PM) action, where the latter will prevent the failure. It is reasonable to expect be avoided by a possible preventive maintenance (PM) at some random time Z. If Z

Langseth, Helge

313

`ODDS ALGORITHM'-BASED OPPORTUNISTIC MAINTENANCE FOR PRESERVING COMPONENT PERFORMANCES  

E-Print Network [OSTI]

part (McCall, 1963). Then an opportunistic maintenance is any action that combines a preventive`ODDS ALGORITHM'-BASED OPPORTUNISTIC MAINTENANCE FOR PRESERVING COMPONENT PERFORMANCES E. Levrat, E Vandoeuvre (France) Abstract: Today, a new role for maintenance exists to enhance the eco

Boyer, Edmond

314

Workforce-Constrained Preventive Maintenance Scheduling using Evolution Strategies  

E-Print Network [OSTI]

Workforce-Constrained Preventive Maintenance Scheduling using Evolution Strategies ABSTRACT Heavy of minimizing the makespan for a set of preventive maintenance (PM) tasks, requiring single- or multiple approach to the SA approach for this class of PM problems. Subject Area: Preventive Maintenance, Evolution

Terwilliger, Mark

315

Maintenance Guide for Greenhouse Ventilation, Evaporative Cooling Heating Systems1  

E-Print Network [OSTI]

when the need is discovered, but a good preventive maintenance program will reduce the number. This fact sheet will emphasize corrective and preventive maintenance procedures for ventilation, evaporativeAE26 Maintenance Guide for Greenhouse Ventilation, Evaporative Cooling Heating Systems1 D. E

Watson, Craig A.

316

Probabilistic service life prediction and maintenance planning of deteriorating structures  

E-Print Network [OSTI]

life prediction of a bridge pier and to the selection of a suitable preventive maintenance scenario. 1 with an aggressive environment, and to eventually plan a process of essential and/or preventive maintenance, some preventive maintenance scenario. 2 RELIABILITY OF DETERIORATING STRUCTURAL SYSTEMS The deterioration

Garavaglia, Elsa

317

Optimal Maintenance Scheduling of a Power Plant with Seasonal  

E-Print Network [OSTI]

-Wide Optimization Meeting · Plan preventive maintenance shutdowns ­ Minimize payment for skilled labor ­ Save onlineOptimal Maintenance Scheduling of a Power Plant with Seasonal Electricity Tariffs Pedro M. Castro maintenance team doing shutdowns · Shutdown period mandatory after [ , ] h online · Challenging (hard

Grossmann, Ignacio E.

318

IEEE TRANSACTIONS ON RELIABILITY 1 Optimal Maintenance Strategies for Wind  

E-Print Network [OSTI]

from sensors, our research objective is to derive an optimal observation and preventive maintenance TRANSACTIONS ON RELIABILITY 3 ACRONYMS NA no action PM preventive maintenance OB observation CM correctiveIEEE TRANSACTIONS ON RELIABILITY 1 Optimal Maintenance Strategies for Wind Turbine Systems Under

Ntaimo, Lewis

319

Single-machine Multiple-recipe Predictive Maintenance , John Hasenbein  

E-Print Network [OSTI]

preventative and corrective maintenance costs, holdings costs, and possibly production costs. An optimal policy. In a conventional preventive maintenance policy, it is typically assumed that the decision maker knows only when, conventional preventive maintenance policies are often one of two types: calendar-based or job

Hasenbein, John

320

Experiment #1 Maintenance of UV/vis Instruments  

E-Print Network [OSTI]

considerably worse than it should be. For these reasons, most companies have a preventive maintenance program that might be included in a preventive maintenance program for a UV-visible spectrometer. Your taskExperiment #1 Maintenance of UV/vis Instruments Objectives: 1. Learn how to use different UV

Nazarenko, Alexander

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Analysis of Preventive Maintenance in Transactions Based Software Systems  

E-Print Network [OSTI]

Analysis of Preventive Maintenance in Transactions Based Software Systems Sachin Garg 1 , Antonio''. However, it incurs some overhead. The necessity to do preventive maintenance not only in general purpose to illustrate the usefulness and applicability of the models. Keywords: Preventive Maintenance, Transactions

Telek, Miklós

322

Maintenance Approaches For ARIES-CS Power Core  

E-Print Network [OSTI]

of Fusion Energy September 14-16, 2004 Madison, WI #12;2 Outline Introduction Reactor parameters Maintenance approach based on field-period units Modular maintenance approach through selected ports Maintenance approach with ports between all the modular coils Summary and conclusion #12;3 Introduction The engineering

323

Software Maintenance and Evolution: Keith Bennett & Vaclav Rajlich  

E-Print Network [OSTI]

for change and improvements. Our aim is to describe a landscape for research in software maintenanceSoftware Maintenance and Evolution: A Roadmap Keith Bennett & Vaclav Rajlich Key Research Pointers transformation techniques. He is a founding co-Director of the Centre for Software Maintenance at Durham

324

Maintenance Management Program for DOE Nuclear Facilities  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of Structures, Systems and Components (SSCs) that are part of the safety basis required by 10 CFR 830.202.1 at hazard category 1, 2 and 3 Department of Energy (DOE) nuclear facilities. Cancels DOE O 433.1. Canceled by DOE O 433.1B.

2007-02-13T23:59:59.000Z

325

Maintenance Management Program for DOE Nuclear Facilities  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of structures, systems and components that are part of the safety basis required by 10 CFR 830.202 at hazard category 1, 2 and 3 DOE nuclear facilities. Admin Chg 1, dated 3-12-2013. Cancels DOE O 433.1A.

2010-04-21T23:59:59.000Z

326

Maintenance Management Program for DOE Nuclear Facilities  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of structures, systems and components that are part of the safety basis required by 10 CFR 830.202 at hazard category 1, 2 and 3 DOE nuclear facilities. Cancels DOE O 433.1A. Admin Chg 1, dated 3-12-2013, cancels DOE O 433.1B.

2010-04-21T23:59:59.000Z

327

31 Tannery Road- Ferreira Construction Headquarters  

High Performance Buildings Database

Branchburg, NJ The 31 Tannery project, located in Branchburg, New Jersey, is the corporate headquarters for Ferreira Construction and Ferreira Group. The facility is 42,000 square feet and serves as office space, shop, and living lab. This state-of-the-art facility raises the bar for a commercial high-performance building, with an eye towards energy independence.

328

Project Management Project Managment  

E-Print Network [OSTI]

­ Inspired by agile methods #12;Background · Large-scale software development & IT projects, plagued relations #12;One Agile Approach to Scheduling · The creative nature of game development resist heavy up Problems ­incompatible platforms, 3rd party etc. #12;Is Games Development Similar? · Yes & No

Stephenson, Ben

329

Project Year Project Team  

E-Print Network [OSTI]

An Engineer's Guide to the Structures of Baltimore Audience Students from the Krieger School of Arts City, interfaced through a course website, the team will integrate descriptions of structural behavior format. Technologies Used HTML/Web Design, MySQL Project Abstract Structural analysis is typically taught

Gray, Jeffrey J.

330

Waste Sampling and Characterization Facility (WSCF). Maintenance Implementation Plan  

SciTech Connect (OSTI)

This Maintenance Implementation Plan has been developed for maintenance functions associated with the Waste Sampling and Characterization Facility (WSCF). This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4A, Maintenance Management Program (DOE 1990), Chapter II. The objective of this plan is to provide baseline information for establishing and identifying WHC conformance programs and policies applicable to implementation of DOE order 4330.4A guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at WSCF.

Bozich, J.L.

1993-07-01T23:59:59.000Z

331

Designing a Bayesian Network for Preventive Maintenance from Expert Opinions in a Rapid  

E-Print Network [OSTI]

Designing a Bayesian Network for Preventive Maintenance from Expert Opinions in a Rapid-Linear Model, Expert Opinion, Complexity Reduction, Maintenance. 1 Introduction Preventive maintenance became essential. Preventive maintenance of a system is taking into account expert knowledge, feedback

Paris-Sud XI, Université de

332

Condition-based maintenance under an imperfect repair policy for a deteriorating production system  

E-Print Network [OSTI]

is periodically monitored. Imperfect preventive maintenance activities, which restore the production system policy, both linear and non-linear imperfect preventive maintenance cost functions are investigated preventive maintenance (or preventive replacement) is usually used. After each preventive maintenance action

Boyer, Edmond

333

Maintenance decision making tool reaching a compromise between maintainability and reliability performances  

E-Print Network [OSTI]

or scheduled preventive maintenance) to condition-based or predictive maintenance strategies preventive maintenance actions, in the sense that planned production stoppages within this temporal horizonMaintenance decision making tool reaching a compromise between maintainability and reliability

Paris-Sud XI, Université de

334

Risk-based Maintenance Allocation and Scheduling for Bulk Electric Power Transmission System Equipment  

E-Print Network [OSTI]

most state of the art reliability centered maintenance (RCM) approaches, but it also accounts equipment, maintenance, reliability, risk, security, optimization 1.Introduction Maintenance of bulk1 Risk-based Maintenance Allocation and Scheduling for Bulk Electric Power Transmission System

335

Global Software Development at Siemens: Experience from Nine Projects  

E-Print Network [OSTI]

Global Software Development at Siemens: Experience from Nine Projects James D. Herbsleb Carnegie@cs.cmu.edu Daniel J. Paulish, Matthew Bass Siemens Corporate Research 755 College Road East Princeton, NJ, USA 08540 +1 609 734 6500 daniel.paulish,Matthew.Bass@siemens.com ABSTRACT We report on the experiences

Herbsleb, James D.

336

EIS-0418: PrairieWinds Project, South Dakota  

Broader source: Energy.gov [DOE]

This EIS analyzes DOE's decision to approve the interconnection request from PrairieWinds for their South Dakota PrairieWinds Project, a 151.5-megawatt (MW) nameplate capacity wind powered generation facility, including 101 General Electric 1.5-MW wind turbine generators, electrical collector lines, collector substation, transmission line, communications system, and wind turbine service access roads.

337

Proactive maintenance initiatives at Argonne National Laboratory-West  

SciTech Connect (OSTI)

In the late 1980`s, ANL-W Management foresaw a need to provide dedicated technical support for maintenance supervisors. Maintenance supervisors were facing increased challenges to ensure all environmental, safety, and waste management regulations were followed in daily maintenance activities. This increased burden was diverting supervisory time away from on-the-job supervision. Supervisors were finding less time for their ``mentor`` roles to ensure maintenance focused on finding and correcting root causes. Additionally the traditional maintenance organization could not keep up with the explosion in predictive maintenance technologies. As a result, engineers were tasked to provide direct technical support to the maintenance organization. Today the maintenance technical support group consists of two mechanical engineers, two electrical engineers and an I&C engineer. The group provides a readily available, quick response resource for crafts people and their supervisors. They can and frequently do ask the support group for help to determine the root cause and to effect permanent fixes. Crafts and engineers work together informally to make an effective maintenance team. In addition to day-to-day problem solving, the technical support group has established several maintenance improvement programs for the site. This includes vibration analysis of rotating machinery, testing of fuel for emergency diesel generators, improving techniques for testing of high efficiency particulate air (HEPA) filters, and capacity testing of UPS and emergency diesel starting batteries. These programs have increased equipment reliability, reduced conventional routine maintenance, reduced unexpected maintenance, and improved testing accuracy. This paper will discuss the interaction of the technical support group within the maintenance department. Additionally the maintenance improvement programs will be presented along with actual cases encountered, the resolutions and lessons learned.

Duckwitz, N.R.; Duncan, L.W.; Whipple, J.J.

1995-06-01T23:59:59.000Z

338

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: A state of the art facility, at Hammersmith information visit the Faculty of Medicine web pages http://www1.imperial.ac.uk/medicine/ Construction Project Team: Project Facts & Figures: Budget: £60 000 000 Funding Source: SRIF II (Imperial College), GSK, MRC

339

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: The refurbishment of the instrumentation equipment. This project encompasses refurbishment work on over 1,150m2 of laboratory space across four, the completed project will allow researchers to expand their work in satellite instrumentation, the fabrication

340

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Project Fact Sheet Project Brief: In the first phase of the Union Building re.union.ic.ac.uk/marketing/building Construction Project Team: Project Facts & Figures: Budget: £1,400,000 Funding Source: Capital Plan and Imperial College Union reserves Construction Project Programme: Start on Site: August 2006 End Date: March

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Volume Project  

E-Print Network [OSTI]

Math 13900. Volume Project. For the following project, you may use any materials. This must be your own original creation. Construct a right pyramid with a base...

rroames

2010-01-12T23:59:59.000Z

342

Over-the-road shock and vibration testing of the radioisotope thermoelectric generator transportation system  

SciTech Connect (OSTI)

Radioisotope Thermoelectric Generators (RTG) convert heat generated by radioactive decay into electricity through the use of thermocouples. The RTGs have a long operating life, are reasonably lightweight, and require little or no maintenance, which make them particularly attractive for use in spacecraft. However, because RTGs contain significant quantities of radioactive materials, normally plutonium-238 and its decay products, they must be transported in packages built in accordance with Title 10, Code of Federal Regulations, Part 71 (10 CFR 71). To meet these regulations, a RTG Transportation System (RTGTS) that fully complies with 10 CFR 71 has been developed, which protects RTGs from adverse environmental conditions during normal conditions of transport (e.g., shock, vibration, and heat). To ensure the protection of RTGs from shock and vibration loadings during transport, extensive over-the-road testing was conducted on the RTG`S to obtain real-time recordings of accelerations of the air-ride suspension system trailer floor, packaging, and support structure. This paper provides an overview of the RTG`S, a discussion of the shock and vibration testing, and a comparison of the test results to the specified shock response spectra and power spectral density acceleration criteria.

Becker, D.L.

1997-05-01T23:59:59.000Z

343

Steam turbine path evaluation during maintenance  

SciTech Connect (OSTI)

The deterioration of a turbine (Steam & Gas) flow path affects the efficiency of the turbine. The most critical factors which affect the efficiency of turbines are: wearing out of the trailing edges of the blades by solid particle erosion, deposits, material loss due to corrosion (also sand blast) which increases the flow area, increases in blade surface roughness, etc. Wearing out of the seals caused by shaft vibrations or rapid start-up leads to significant leakage losses. Some of these effects can be estimated with some precision during operation of the turbine, but an exact evaluation can be carried out during a maintenance applying a special fluid flow analysis program. Such a program has been developed and then adapted to achieve this goal. During maintenance the complete geometry of the steam path is measured (blades lengths, widths, angles, clearances, etc.) in the condition encountered before any corrections. Then the similar measurement is undertaken after, for example, clearance corrections, blade replacements, cleaning of the blades, etc. Using the program first of all the design data is calculated. Then the actual data is fed into the program and compared to the design data. Thus the effect of the blade surface roughness, increased seal clearances, flow area increase, solid particle damage to the trailing edge and so on for each particular stage is calculated. The effect is expressed in [kW] as a deviation from the design points. This data can be helpful during online evaluation of the turbine performance. This evaluation helps the management of the plant in undertaking the correct decision concerning the date of the next major maintenance and replacement part procurement. Many turbines in the Mexican utility have been evaluated in such a manner. Some examples are presented.

Kubiak, J.; Angel, F. del; Carnero, A.; Campos, A. [Instituto de Investigaciones Electricas, Temixo, Morelos (Mexico)] [and others

1996-07-01T23:59:59.000Z

344

Sandia National Laboratories: Operations and Maintenance Workshop  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 -theErik Spoerke SSLSMolten-Salt StorageNoLong Range Radar StationReportsMaintenance

345

Technology status of hydrogen road vehicles. IEA technical report from the IEA Agreement of the production and utilization of hydrogen  

SciTech Connect (OSTI)

The report was commissioned under the Hydrogen Implementing Agreement of the International Energy Agency (IEA) and examines the state of the art in the evolving field of hydrogen-fueled vehicles for road transport. The first phase surveys and analyzes developments since 1989, when a comprehensive review was last published. The report emphasizes the following: problems, especially backfiring, with internal combustion engines (ICEs); operational safety; hydrogen handling and on-board storage; and ongoing demonstration projects. Hydrogen vehicles are receiving much attention, especially at the research and development level. However, there has been a steady move during the past 5 years toward integral demonstrations of operable vehicles intended for public roads. Because they emit few, or no greenhouse gases, hydrogen vehicles are beginning to be taken seriously as a promising solution to the problems of urban air quality. Since the time the first draft of the report was prepared (mid-19 96), the 11th World Hydrogen Energy Conference took place in Stuttgart, Germany. This biennial conference can be regarded as a valid updating of the state of the art; therefore, the 1996 results are included in the current version. Sections of the report include: hydrogen production and distribution to urban users; on-board storage and refilling; vehicle power units and drives, and four appendices titled: 'Safety questions of hydrogen storage and use in vehicles', 'Performance of hydrogen fuel in internal production engines for road vehicles, 'Fuel cells for hydrogen vehicles', and 'Summaries of papers on hydrogen vehicles'. (refs., tabs.)

Doyle, T.A.

1998-01-31T23:59:59.000Z

346

The walled city : Beijing hybrid development plan in the 2nd ring road  

E-Print Network [OSTI]

The circular ring roads are one of the key elements that define the spatial organization of Beijing today. However, as the city continues to expand, the ring roads located in the inner city, combined with the gridded ...

Liang, Shaoyi

2014-01-01T23:59:59.000Z

347

E-Print Network 3.0 - air pollution ii--road Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ii--road Search Powered by Explorit Topic List Advanced Search Sample search results for: air pollution ii--road Page: << < 1 2 3 4 5 > >> 1 Air Pollution Physics and Chemistry EAS...

348

Kursplan fr lsret 2001/2002 ROAD-MAN-LANDSCAPE -DESIGNPROJECT ASB150  

E-Print Network [OSTI]

, landscape and environmental requirements. Innehåll: Course content: New roads in the landscape. Conversion concepts in traffic planning, road construction, landscape architecture, urban architecture, planning (graduate) students of engineering, architecture and landscape architecture, and future planners

349

Project Controls  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Project controls are systems used to plan, schedule, budget, and measure the performance of a project/program. The cost estimation package is one of the documents that is used to establish the baseline for project controls. This chapter gives a brief description of project controls and the role the cost estimation package plays.

1997-03-28T23:59:59.000Z

350

AVTA: ARRA EV Project Vehicle Placement Maps  

Broader source: Energy.gov [DOE]

The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The American Recovery and Reinvestment Act supported a number of projects that together made up the largest ever deployment of plug-in electric vehicles and charging infrastructure in the U.S. The following maps describe where the EV Project deployed 5,700 all-electric Nissan Leafs and 2,600 plug-in hybrid electric Chevrolet Volts.

351

A cask maintenance facility feasibility study  

SciTech Connect (OSTI)

The Oak Ridge National Laboratory (ORNL) is developing a transportation system for spent nuclear fuel (SNF) and defense high level waste (HLW) as a part of the Federal Waste Management System (FWMS). In early 1988, a feasibility study was undertaken to design a stand-alone, ''green field'' facility for maintaining the FWMS casks. The feasibility study provided an initial layout facility design, an estimate of the construction cost, and an acquisition schedule for a Cask Maintenance Facility (CMF). The study also helped to define the interfaces between the transportation system and the waste generators, the repository, and a Monitored Retrievable Storage (MRS) facility. The data, design, and estimated costs resulting from the study have been organized for use in the total transportation system decision-making process. Most importantly, the feasibility study also provides a foundation for continuing design and planning efforts. Fleet servicing facility studies, operational studies from current cask system operators, a definition of the CMF system requirements, and the experience of others in the radioactive waste transportation field were used as a basis for the feasibility study. In addition, several cask handling facilities were visited to observe and discuss cask operations to establish the functions and methods of cask maintenance expected to be used in the facility. Finally, a peer review meeting was held at Oak Ridge, Tennessee in August, 1988, in which the assumptions, design, layout, and functions of the CMF were significantly refined. Attendees included representatives from industry, the repository and transportation operations.

Rennich, M.J.; Medley, L.G.; Attaway, C.R.

1989-01-01T23:59:59.000Z

352

Second Line of Defense Help Desk: Electronic Maintenance Reports - Local Maintenance Provider User Guide Rev. 1  

SciTech Connect (OSTI)

The Electronic Maintenance Report forms present a uniform dataset for analysis of Sustainability metrics. These forms collect readily minable data while allowing the attachment of site-specific checklists or other supporting files for review by the Sustainability Manager and Program Management.

Leigh, Richard J.

2011-12-14T23:59:59.000Z

353

AVTA: ARRA EV Project Overview  

Broader source: Energy.gov [DOE]

The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The American Recovery and Reinvestment Act supported a number of projects that together made up the largest ever deployment of plug-in electric vehicles and charging infrastructure in the U.S. The following document describes the context of the EV Project, which partnered with city, regional and state governments, utilities, and other organizations in 16 cities to deploy about 14,000 Level 2 PEV chargers and 300 DC fast chargers. It also deployed 5,700 all-electric Nissan Leafs and 2,600 plug-in hybrid electric Chevrolet Volts.

354

TRUPACT-II Operating and Maintenance Instructions  

SciTech Connect (OSTI)

The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II) Shipping Package and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP) and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9218. In the event there is a conflict between this document and the TRUPACT-II SARP, the TRUPACT-II SARP shall govern. TRUPACT-II C of C number 9218 states, ''... each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application.'' It further states, ''... each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the application.'' Chapter 9 of the TRUPACT-II SARP charges the Westinghouse Electric Corporation Waste Isolation Division (WID) with assuring that the TRUPACT-II is used in accordance with the requirements of the C of C. To meet this requirement and verify consistency of operations when loading and unloading the TRUPACT-II on the trailer, placing a payload in the packaging, unloading the payload from the packaging, or performing maintenance, the U.S. Department of Energy Carlsbad Area Office (U.S. DOE/CAO) finds it necessary to implement the changes that follow. This TRUPACT-II maintenance document represents a change to previous philosophy regarding site specific procedures for the use of the TRUPACT-II. This document details the instructions to be followed to consistently operate and maintain the TRUPACT-II. The intent of these instructions is to ensure that all users of the TRUPACT-II follow the same or equivalent instructions. Users may achieve this intent by any of the following methods: (1) Utilizing these instructions as is, or (2) Attaching a site-specific cover page/letter to this document stating that these are the instructions to be used at their location, or (3) Sites may prepare their own document using the steps in this document word-for-word, in-sequence, including Notes and Cautions. Site specific information may be included as deemed necessary. Submit the document to WID National TRU Programs for approval. Any revision made subsequent to WID TRU Program's approval shall be reviewed and approved by WID TRU Programs. A copy of the approval letter from WID National TRU Programs should be available for audit purposes. Users shall develop site-specific procedures addressing leak testing, preoperational activities, quality assurance, hoisting and rigging, and radiation health physics to be used in conjunction with the instructions contained in this document. Users desiring to recommend changes to this document may submit their recommendations to the WID National TRU Programs for evaluation. If approved, the change(s) will be incorporated into this document for use by all TRUPACT-II users. User sites will be audited to this document to ensure compliance within one year from the effective date of this revision. This document discusses operating instructions, required inspections and maintenance for the following: TRUPACT-II packaging, and Miscellaneous packaging, special tools, and equipment. Packaging and payload handling equipment and transport trailers have been specifically designed for use with the TRUPACT-II Packaging. This document discusses the required instructions for use of the following equipment in conjunction with the TRUPACT-II Packaging: TRUPACT-II Mobile Loading Unit (MLU), Adjustable Center-of-Gravity Lift Fixture (ACGLF), and TRUPACT-II Transport Trailer. Attachment E contains the various TRUPACT-II packaging interface control drawings, leak-test and vent-port tool drawings, ACGLF drawings, and tie-down drawings that identify the various system components.

Westinghouse Electric Corporation, Waste Isolation Division

1999-12-31T23:59:59.000Z

355

Microsoft Word - PC-000580_0_NGNP Technology Road Mapping Report...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

lower reactor outlet helium temperature range. NGNP Technology Development Road Mapping Report PC-0005800 ix TABLE OF CONTENTS ACRONYMS ......

356

Road Haulage of Round Timber Code of Practice Forestry Commission Policy  

E-Print Network [OSTI]

Road Haulage of Round Timber Code of Practice Forestry Commission Policy It is Forest Enterprise and companies when they are operating on Forestry Commission land. The main road network in Forestry Commission. FC will be reviewing its policy with regard to the Road haulage of Round Timber Code of Practice

357

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 6,  

E-Print Network [OSTI]

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 6, January 2007 Gary A 80208 June 2007 #12;On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 6 1-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 6 2 INTRODUCTION Many cities

Denver, University of

358

On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 2  

E-Print Network [OSTI]

On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 2 Sajal S. Pokharel, Gary Alpharetta, Georgia 30022 Contract No. E-23-4 #12;On-Road Remote Sensing of Automobile Emissions when the measurements were binned by model year. #12;On-Road Remote Sensing of Automobile Emissions

Denver, University of

359

On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 5,  

E-Print Network [OSTI]

On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 5, November 2004 Gary A, Suite 140 Alpharetta, Georgia 30022 Contract No. E-23-9 #12;On-Road Remote Sensing of Automobile campaigns.14 #12;On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 5 2 INTRODUCTION

Denver, University of

360

On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 3  

E-Print Network [OSTI]

On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 3 Sajal S. Pokharel, Gary Alpharetta, Georgia 30022 Contract No. E-23-4 #12;On-Road Remote Sensing of Automobile Emissions a slight negative dependence on #12;On-Road Remote Sensing of Automobile Emissions in the Phoenix Area

Denver, University of

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 5,  

E-Print Network [OSTI]

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 5, January 2005 Gary A, Suite 140 Alpharetta, Georgia 30022 Contract No. E-23-9 #12;On-Road Remote Sensing of Automobile campaigns.13 #12;On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 5 2 INTRODUCTION

Denver, University of

362

On-Road Remote Sensing of Automobile Emissions in the LaBrea Area: Year 2  

E-Print Network [OSTI]

On-Road Remote Sensing of Automobile Emissions in the LaBrea Area: Year 2 Mitchell J. Williams 140 Alpharetta, Georgia 30022 Contract No. E-23-4 #12;On-Road Remote Sensing of Automobile Emissions compared to the standard error of the mean measurements. #12;On-Road Remote Sensing of Automobile Emissions

Denver, University of

363

Going-to-the-Sun Road, Glacier National Park, MT, USA  

E-Print Network [OSTI]

Going-to-the-Sun Road, Glacier National Park, MT, USA Avalanche Path Atlas Erich H. Peitzsch Daniel..................................................................................................................................... 2 Overview of Red Rock Group avalanche paths, Going-to-the-Sun Road, Glacier National Park, MT................................................................................................................................................... 3 Overview of Lower GTSR group avalanche paths, Going-to-the-Sun Road, Glacier National Park, MT

364

Explaining the road accident risk: weather effects Ruth Bergel-Hayat1*  

E-Print Network [OSTI]

1 Explaining the road accident risk: weather effects Ruth Bergel-Hayat1* , Mohammed Debbarh1 conditions and road accident risk at an aggregate level and on a monthly basis, in order to improve road accidents. Time series analysis models with explanatory variables that measure the weather quantitatively

Paris-Sud XI, Université de

365

On-Road Emission Measurements of Reactive Nitrogen Compounds from  

E-Print Network [OSTI]

, nitric oxide (NO), nitrogen dioxide (NO2), ammonia (NH3), and nitrous acid (HONO) produced by internalOn-Road Emission Measurements of Reactive Nitrogen Compounds from Three California Cities G A R Y measurements of reactive nitrogen compounds from light-duty vehicles. At the San Jose and wLA sites

Denver, University of

366

A ROAD MAP OF MOTIVIC HOMOTOPY AND HOMOLOGY THEORY  

E-Print Network [OSTI]

functors. Here is the main diagram, or road map. _______||h ____________ _______________|Spc to the Nisnevich topology on Sm=k, so the category Spc of "spaces" is just the category of Nisnevich sheaves on Sm CHARLES WEIBEL presheaf into a space, of course. In the category Spc , a smooth scheme X is th* *e

367

An Investigation of Optimal Vehicle Maneuvers for Different Road Conditions  

E-Print Network [OSTI]

vehicle maneuvers in time-critical situations have emerged as powerful tools during the past years. EvenAn Investigation of Optimal Vehicle Maneuvers for Different Road Conditions Bj¨orn Olofsson Lund, Sweden, firstname.lastname@control.lth.se. Department of Electrical Engineering, Link

368

On-Road Vehicle Detection Using Optical Sensors: A Review  

E-Print Network [OSTI]

1 On-Road Vehicle Detection Using Optical Sensors: A Review Zehang Sun1 , George Bebis2 and Ronald are expected to add up to 1%-3% of the world's gross domestic product [1]. With the aim of reducing injury

Bebis, George

369

Office of the General Counsel 777 Glades Road  

E-Print Network [OSTI]

Office of the General Counsel 777 Glades Road Boca Raton, FL 33431 tel: 561.297.3007 / fax: 561) communications intended to protect student, campus, or public safety. The Florida law is commonly interpreted be disclosed? Answer: In general, information derived from a student's education records may be disclosed only

Fernandez, Eduardo

370

Story Road Landfill Solar Site Evaluation: San Jose  

Broader source: Energy.gov [DOE]

This report describes the findings of a solar site evaluation conducted at the Story Road Landfill (Site) in the City of San Jose, California (City). This evaluation was conducted as part of a larger study to assess solar potential at multiple public facilities within the City.

371

Fuel-Based On-Road Motor Vehicle Emissions Inventory  

E-Print Network [OSTI]

Fuel-Based On-Road Motor Vehicle Emissions Inventory for the Denver Metropolitan Area Sajal S of Denver 2101 E. Wesley Ave. Denver, CO 80208 #12;Mobile Source Emissions Inventory Methods MOBILE emission factors -g/mile uncertain Vehicle miles traveled -very uncertain Speed correction factors Inventory

Denver, University of

372

The long and winding road of state building  

E-Print Network [OSTI]

Chapter 15 The long and winding road of state building Sagar Raj Sharma1 1. Context Post and services, including security. In this book, we have attempted to view state-building as essentially with various such aspects of state-building in today's post-conflict Nepal. The first two chapters have dealt

Richner, Heinz

373

FOR341 Timber Harvesting and Forest Roads Spring 2009  

E-Print Network [OSTI]

Text: Water Quality BMPs (Best Management Practices) for Montana Forests Other readings as assigned management. Best management practices as they apply to forest operations in Montana and the western US, cost effectiveness, and environmental performance of forest road systems. · Upper Division Writing

Vonessen, Nikolaus

374

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: The works cover the refurbishment of floors 4, 5, with `wet' labs for molecular biology, materials characterisation, cell culture and flow studies, and `dry operating theatre. The Bionanotechnology Centre is one of the projects funded from the UK Government's £20

375

Simple Maintenance Saves Costly Furnace Repair/Replacement |...  

Broader source: Energy.gov (indexed) [DOE]

furnace maintenance, which includes: Checking the condition of the vent connection pipe and chimney Checking the physical integrity of the heat exchanger Adjusting the...

376

Article Published on LED Lumen Maintenance and Light Loss Factors...  

Broader source: Energy.gov (indexed) [DOE]

of a comprehensive lifetime rating - as well as the problematic relationship between SSL lifetime and lumen maintenance - determining an appropriate LLD factor for LED products...

377

ANNUAL MAINTENANCE AND LEAK TESTING FOR THE 9975 SHIPPING PACKAGE  

SciTech Connect (OSTI)

The purpose of this document is to provide step-by-step instructions for the annual helium leak test certification and maintenance of the 9975 Shipping Package.

Trapp, D.

2014-08-25T23:59:59.000Z

378

Joint Maintenance Status Report of Potomac Electric Power Company...  

Broader source: Energy.gov (indexed) [DOE]

pursuant to the December 20. 2006, Department of Energy ("DOE") Order No. 202-05-3. Joint Maintenance Status Report of Potomac Electric Power Company amd PJM Interconnection,...

379

Technical information report: Plasma melter operation, reliability, and maintenance analysis  

SciTech Connect (OSTI)

This document provides a technical report of operability, reliability, and maintenance of a plasma melter for low-level waste vitrification, in support of the Hanford Tank Waste Remediation System (TWRS) Low-Level Waste (LLW) Vitrification Program. A process description is provided that minimizes maintenance and downtime and includes material and energy balances, equipment sizes and arrangement, startup/operation/maintence/shutdown cycle descriptions, and basis for scale-up to a 200 metric ton/day production facility. Operational requirements are provided including utilities, feeds, labor, and maintenance. Equipment reliability estimates and maintenance requirements are provided which includes a list of failure modes, responses, and consequences.

Hendrickson, D.W. [ed.

1995-03-14T23:59:59.000Z

380

Optimal forest management for carbon sequestration and biodiversity maintenance.  

E-Print Network [OSTI]

??Managing planted forests for carbon sequestration and biodiversity maintenance has become increasingly important in times of rapid climate change and the loss of biodiversity worldwide. (more)

Nghiem, Thi Hong Nhung

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Managing preventative maintenance activities at Intel Corporation  

E-Print Network [OSTI]

The work for this thesis was completed at Intel Corporation in Colorado Springs, Colorado at Fab 23, a semiconductor fabrication facility making flash memory. The project focused on evaluating and managing preventative ...

Fearing, Rebecca Cassler

2006-01-01T23:59:59.000Z

382

Preventative maintenance plan for emergency pumping trailers  

SciTech Connect (OSTI)

The purpose/goal of this document is to identify the maintenance requirements and resources available to properly maintain the readiness and condition of the Emergency Pumping Equipment controlled by the Tank Waste Remediation System Tank Farms Plant Engineering and Tank Stabilization Operations. This equipment is intended to pump a single-shell tank (SST) that has been identified as an assumed leaking tank. The goal is to commence pumping (submersible or jet) as soon as safely possible after identifying a SST as an assumed leaking tank. Important information pertaining to the Emergency Pumping Equipment, Over-Ground Piping installation, and procedures is found in WHC-SD-WM-AP-005, ``Single Shell Tank Leak Emergency Pumping Guide.``

Wiggins, D.D.

1994-09-01T23:59:59.000Z

383

Research and Development for Off-Road Fuel Cell Applications U.S. Department of Energy Grant DE-FG36-04GO14303 - Final Report  

SciTech Connect (OSTI)

Off-road concerns are related to the effects of shock and vibration and air quality on fuel cell power requirements. Mechanical stresses on differing material makeup and mass distribution within the system may render some components susceptible to impulse trauma while others may show adverse effects from harmonic disturbances or broad band mechanical agitation. One of the recognized challenges in fuel cell systems air purification is in providing a highly efficient particulate and chemical filter with minimal pressure drop. PEM integrators do not want additional parasitic loads added to the system as compensation for a highly efficient yet highly restrictive filter. Additionally, there is challenge in integrating multiple functions into a single air intake module tasked with effectively filtering high dust loads, diesel soot, pesticides, ammonias, and other anticipated off-road contaminants. This project has investigated both off-road associated issues cumulating in the prototype build and testing of two light duty off-road vehicles with integrated fuel cell power plant systems.

Hicks, Michael [H2PowerTech (formerly known as IdaTech)] [H2PowerTech (formerly known as IdaTech); Erickson, Paul [Univeristy of California at Davis] [Univeristy of California at Davis; Lawrence, Richard [Retired (formerly employed by IdaTech)] [Retired (formerly employed by IdaTech); Tejaswi, Arun [Univeristy of California at Davis] [Univeristy of California at Davis; Brum, Magdalena [Univeristy of California at Davis] [Univeristy of California at Davis

2013-04-30T23:59:59.000Z

384

Integrated project management plan for the Plutonium Finishing Plant stabilization and deactivation project  

SciTech Connect (OSTI)

This document sets forth the plans, organization, and control systems for managing the PFP Stabilization and Deactivation Project, and includes the top level cost and schedule baselines. The project includes the stabilization of Pu-bearing materials, storage, packaging, and transport of these and other nuclear materials, surveillance and maintenance of facilities and systems relied upon for storage of the materials, and transition of the facilities in the PFP Complex.

SINCLAIR, J.C.

1999-05-03T23:59:59.000Z

385

Circle Project  

E-Print Network [OSTI]

This project asks students to decide if a collection of points in space do or do not lie on a ... The project is accessible to linear algebra students who have studied...

386

Long Length Contaminated Equipment Retrieval System Receiver Trailer and Transport Trailer Operations and Maintenance Manual  

SciTech Connect (OSTI)

A system to accommodate the removal of long-length contaminated equipment (LLCE) from Hanford underground radioactive waste storage tanks was designed, procured, and demonstrated, via a project activity during the 1990s. The system is the Long Length Contaminated Equipment Removal System (LLCERS). LLCERS will be maintained and operated by Tank Farms Engineering and Operations organizations and other varied projects having a need for the system. The responsibility for the operation and maintenance of the LLCERS Receiver Trailer (RT) and Transport Trailer (TT) resides with the RPP Characterization Project Operations organization. The purpose of this document is to provide vendor supplied operating and maintenance (O & M) information for the RT and TT in a readily retrievable form. This information is provided this way instead of in a vendor information (VI) file to maintain configuration control of the operations baseline as described in RPP-6085, ''Configuration Management Plan for Long Length Contaminated Equipment Receiver and Transport Trailers''. Additional Operations Baseline documents are identified in RPP-6085.

DALE, R.N.

2000-05-01T23:59:59.000Z

387

Department of Industrial & Manufacturing Engineering Fall 2011 Mining Media Handling Project  

E-Print Network [OSTI]

Project Overview Metso wants to develop a media handling solution (machinery and/or process) to enhance that optimizes media discharge, recharge and liner maintenance procedures in accordance with the handling system

Demirel, Melik C.

388

05.01 1 Budget Maintenance and Development REGENTS' POLICY  

E-Print Network [OSTI]

05.01 1 Budget Maintenance and Development REGENTS' POLICY PART V FINANCE AND BUSINESS MANAGEMENT Chapter 05.01 - Budget Development and Maintenance P05.01.010. Budget Policy. A. The budget by their respective annually adopted budgets and approved amendments, in accordance with procedure established

Pantaleone, Jim

389

Modeling Web Maintenance Centers Through Queue Models M. Di Penta  

E-Print Network [OSTI]

Modeling Web Maintenance Centers Through Queue Models M. Di Penta , G. Casazza ¡ , G. Antoniol´eal Abstract The Internet and WEB pervasiveness are changing the landscape of several different areas ranging from infor- mation gathering/managing and commerce to software development, maintenance and evolution

Di Penta, Massimiliano

390

Printing Your Monthly PTA Maintenance Screen Shannon Monahan Page 1  

E-Print Network [OSTI]

Printing Your Monthly PTA Maintenance Screen Shannon Monahan Page 1 Office of Postdoctoral Maintenance Screen. All starting points begin before the popup menu comes up. In Internet Explorer the Orientation to Landscape, and click OK. Print as needed to either your printer or to Adobe PDF (only works

Kay, Mark A.

391

STANDARD OPERATING PROCEDURES Sampler Maintenance by Site Operators  

E-Print Network [OSTI]

IMPROVE STANDARD OPERATING PROCEDURES SOP 201 Sampler Maintenance by Site Operators Date Last.0 PURPOSE AND APPLICABILITY This standard operating procedure (SOP) describes the procedures and schedules. The procedural steps for weekly maintenance and repairs performed by the site operator are included in TI 201A

Fischer, Emily V.

392

Installation, Operation, and Maintenance Strategies to Reduce the Cost of Offshore Wind Energy  

SciTech Connect (OSTI)

Currently, installation, operation, and maintenance (IO&M) costs contribute approximately 30% to the LCOE of offshore wind plants. To reduce LCOE while ensuring safety, this paper identifies principal cost drivers associated with IO&M and quantifies their impacts on LCOE. The paper identifies technology improvement opportunities and provides a basis for evaluating innovative engineering and scientific concepts developed subsequently to the study. Through the completion of a case study, an optimum IO&M strategy for a hypothetical offshore wind project is identified.

Maples, B.; Saur, G.; Hand, M.; van de Pieterman, R.; Obdam, T.

2013-07-01T23:59:59.000Z

393

HVdc converter terminal maintenance/spare parts philosophy and comparison with performance  

SciTech Connect (OSTI)

Data has been published primarily by CIGRE on operating experience of HVdc systems in such areas as availability, forced outage rate, thyristor failure rate, etc. This paper presents complementary data derived primarily from a utility survey to enhance the CIGRE-published data in these same areas on a major portion of the 45 HVdc projects now operating worldwide. The comparison and correlations drawn between the published operating data and the utility procurement, design and maintenance practices of the corresponding HVdc system will serve to illustrate the return the utilities may be receiving in improved system performance from the additional invested resources.

Melvold, D.J. (Dept. of Water and Power, Los Angeles, CA (US))

1992-04-01T23:59:59.000Z

394

INL Sitewide Operations and Maintenance Report for CERCLA Response Actions - FY 2005  

SciTech Connect (OSTI)

This report documents how remedies mandated by the Comprehensive Environmental Response, Compensation, and Liability Act for the Idaho National Laboratory Site were operated and maintained during fiscal year 2005. The activities addressed in the INEEL Sitewide Operations and Maintenance Plan are reported in this document. Waste Area Groups 7 and 8 are not reported in this document. Waste Area Group 7 is an operating facility, and the status of its operations is reported directly to the regulatory agencies. Waste Area Group 8 is excluded from this report, because it falls outside the direct control of U.S. Department of Energy Idaho Operations Office. The INEEL Sitewide Institutional Controls Plan discusses the inspection, maintenance, repair, and reporting activities involving institutional controls at the Idaho National Laboratory Site. Therefore, the maintenance of institutional controls is not discussed in this report. The Idaho National Engineering and Environmental Laboratory Comprehensive Facilities and Land Use Plan provides a reference to support this report by providing current and projected facility and land uses and by listing the Comprehensive Environmental Response, Compensation, and Liability Act sites.

D. R. Fitch

2005-09-22T23:59:59.000Z

395

Characterization of road asphalt using Gel Permeation Chromatography  

E-Print Network [OSTI]

of research in the ares of asphalt chemistry. Brulh has proposed two theoretical extremes, a sol state and a gel state, to describe the condition of asphalts. In a sol state, asphaltene micelles are widely dispersed and do not interact a great deal. In a... December 1987 Major Subject: Chemical Engineering CHARACTERIZATION OF ROAD ASPHALT USING GEL PERMEATION CHROMATOGRAPHY A Thesis by GUY RANDAL DONALDSON Approved as to style and content by: Jerr A. Bullin hairm of Committee) Char e G. Glover...

Donaldson, Guy Randal

1987-01-01T23:59:59.000Z

396

Moose Wilson Road, Wyoming: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to:46 -Energieprojekte3 Climate ZoneMontrose, Wisconsin: EnergyMoodyMoose Creek,Road,

397

Cross Roads, Texas: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentratingRenewable Solutions LLC Jump to:InformationCrandall,CriteriaCrookston WindRoads,

398

Wind turbine reliability : understanding and minimizing wind turbine operation and maintenance costs.  

SciTech Connect (OSTI)

Wind turbine system reliability is a critical factor in the success of a wind energy project. Poor reliability directly affects both the project's revenue stream through increased operation and maintenance (O&M) costs and reduced availability to generate power due to turbine downtime. Indirectly, the acceptance of wind-generated power by the financial and developer communities as a viable enterprise is influenced by the risk associated with the capital equipment reliability; increased risk, or at least the perception of increased risk, is generally accompanied by increased financing fees or interest rates. Cost of energy (COE) is a key project evaluation metric, both in commercial applications and in the U.S. federal wind energy program. To reflect this commercial reality, the wind energy research community has adopted COE as a decision-making and technology evaluation metric. The COE metric accounts for the effects of reliability through levelized replacement cost and unscheduled maintenance cost parameters. However, unlike the other cost contributors, such as initial capital investment and scheduled maintenance and operating expenses, costs associated with component failures are necessarily speculative. They are based on assumptions about the reliability of components that in many cases have not been operated for a complete life cycle. Due to the logistical and practical difficulty of replacing major components in a wind turbine, unanticipated failures (especially serial failures) can have a large impact on the economics of a project. The uncertainty associated with long-term component reliability has direct bearing on the confidence level associated with COE projections. In addition, wind turbine technology is evolving. New materials and designs are being incorporated in contemporary wind turbines with the ultimate goal of reducing weight, controlling loads, and improving energy capture. While the goal of these innovations is reduction in the COE, there is a potential impact on reliability whenever new technologies are introduced. While some of these innovations may ultimately improve reliability, in the short term, the technology risks and the perception of risk will increase. The COE metric used by researchers to evaluate technologies does not address this issue. This paper outlines the issues relevant to wind turbine reliability for wind turbine power generation projects. The first sections describe the current state of the industry, identify the cost elements associated with wind farm O&M and availability and discuss the causes of uncertainty in estimating wind turbine component reliability. The latter sections discuss the means for reducing O&M costs and propose O&M related research and development efforts that could be pursued by the wind energy research community to reduce COE.

Not Available

2004-11-01T23:59:59.000Z

399

Maintenance implementation plan for B Plant  

SciTech Connect (OSTI)

The B Plant facility, is located in the 200 East Area at the Hanford Site in south-central Washington State. It consists of two major operating areas: the B Plant Canyon Building, and the Waste Encapsulation and Storage Facility (WESF). The B Plant was originally designed to chemically process spent nuclear fuels. After this initial mission was completed, the plant was modified to provide for the separation of strontium and cesium, individually, from the fission productwaste stream following plutonium and uranium recovery from irradiated reactor fuels in the Plutonium-Uranium Extraction Plant (PUREX). The recovered, purified, and concentrated strontium and cesium solutions were then transferred to the WESF for conversion to solid compounds, encapsulation, and interim storage. After strontium and cesium removal, the remaining waste was transferred from B Plant to tank farms. B Plantis an operating facility that is required to ensure safe storage And management of the WESF cesium and strontium capsules, as well as a substantial radiological inventory remaining in the plant from previous campaigns. There are currently no production activities at B Plant, but several operating systems are required to accomplish the current B Plant mission.B Plant receives and stores various chemicals from commercial suppliers for treatment of low-level waste generated at WESF and B Plant, generation of demineralized water, and conditioning of water used in heating, ventilation, and air conditioning units. This report describes the maintenance of B Plant, including personnel training and schedules.

Tritt, S.E.

1992-06-01T23:59:59.000Z

400

Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration. [Reliability Centered Maintenance (RCM)  

SciTech Connect (OSTI)

This feasibility study examines reliability centered maintenance (RCM) as it applies to Bonneville Power Administrations (BPA) substation maintenance program. Reliability techniques are examined in evaluated. Existing BPA equipment maintenance procedures are documented. Equipment failure history is considered. Economic impacts are estimated. Various equipment instrumentation methods are reviewed. Based on this analysis a prototype system is proposed. The prototype will be implemented in two phases. Phase 1 is to be completed in 1992, it includes instrumenting one power transformer and one oil circuit breaker. Software development will focus on displaying data. Phase 2 is to be completed the following year. The remaining transformers and breakers will be instrumented during the second phase. Software development will focus on predictive maintenance techniques and maintenance decision support.

Purucker, S.L.; Tonn, B.E.; Goeltz, R.T.; James, R.D.; Kercel, S.; Rizy, D.T.; Simpson, M.L.; Van Dyke, J.W.

1992-05-28T23:59:59.000Z

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Cultural Resource Investigations for a Multipurpose Haul Road on the Idaho National Laboratory  

SciTech Connect (OSTI)

The U. S. Department of Energy, Idaho Operations Office is considering options for construction of a multipurpose haul road to transport materials and wastes between the Materials and Fuels Complex (MFC) and other Idaho National Laboratory (INL) Site facilities. The proposed road will be closed to the public and designed for limited year-round use. Two primary options are under consideration: a new route south of the existing T-25 power line road and an upgrade to road T-24. In the Spring of 2010, archaeological field surveys and initial coordination and field reconnaissance with representatives from the Shoshone-Bannock Tribes were completed to identify any resources that may be adversely affected by the proposed road construction and to develop recommendations to protect any listed or eligible for listing on the National Register of Historic Places. The investigations showed that 24 archaeological resources and one historic marker are located in the area of potential effects for road construction and operation south of the T-25 powerline road and 27archaeological resources are located in the area of potential effects for road construction and operation along road T-24. Generalized tribal concerns regarding protection of natural resources were also documented in both road corridors. This report outlines recommendations for additional investigations and protective measures that can be implemented to minimize adverse impacts to the identified resources.

Brenda R. Pace; Cameron Brizzee; Hollie Gilbert; Clayton Marler; Julie Braun Williams

2010-08-01T23:59:59.000Z

402

Decommissioning and Dismantling of the Floating Maintenance Base 'Lepse' - 13316  

SciTech Connect (OSTI)

The Lepse was built in Russia in 1934 and commissioned as a dry cargo ship. In 1961 she was re-equipped for use as a nuclear service ship (NSS), specifically a floating maintenance base (FMB), to support the operation of the civilian nuclear fleet (ice-breakers) of the USSR. In 1988 Lepse was taken out of service and in 1990 she was re-classified as a 'berth connected ship', located at a berth near the port of Murmansk under the ownership of Federal State Unitary Enterprise (FSUE) Atomflot. Lepse has special storage facilities for spent nuclear fuel assemblies (SFA) that have been used to store several hundred SFAs for nearly 40 years. High and intermediate-level liquid radioactive waste (LRW) is also present in the spent nuclear fuel assembly storage channels, in special tanks and also in the SFA cooling circuit. Many of the SFAs stored in Lepse are classified as damaged and cannot be removed using standard procedures. The removal of the SFA and LRW from the Lepse storage facilities is a hazardous task and requires specially designed tools, equipment and an infrastructure in which these can be deployed safely. Lepse is a significant environmental hazard in the North West of Russia. Storing spent nuclear fuel and high-level liquid radioactive waste on board Lepse in the current conditions is not acceptable with respect to Russian Federation health, safety and environmental standards and with international best practice. The approved concept design for the removal of the SFA and LRW and dismantling of Lepse requires that the ship be transported to Nerpa shipyard where specialist infrastructure will be constructed and equipment installed. One of the main complexities of the Project lies within the number of interested stakeholders involved in the Project. The Lepse project has been high focus on the international stage for many years with previous international efforts failing to make significant progress towards the objective of decommissioning Lepse. The Northern Dimension Environmental Partnership (NDEP) approved an internationally funded project to identify and prioritise nuclear and environmental hazards in NW Russia. Within this project the Lepse was recognised as being one of the highest nuclear hazards in NW Russia. Removal of SNF, SRW and LRW from Lepse requires innovative design and development of bespoke equipment. The main drivers of the NDEP Donors are first to safely transport Lepse in 2012 from her current berth close to the local population in Murmansk to the nominated dismantling shipyard, and secondly to raise Lepse from the water in 2013 onto the slip-way at the dismantling shipyard. A description is provided of the approach and progress towards preparing the Lepse for the removal of SFAs and other radioactive waste, to decontaminate and then dismantle the vessel under international donor funding. (authors)

Field, D.; Mizen, K. [Nuvia Limited (United Kingdom)] [Nuvia Limited (United Kingdom)

2013-07-01T23:59:59.000Z

403

Project Construction  

Broader source: Energy.gov [DOE]

Integrating renewable energy into Federal new construction or major renovations requires effective structuring of the construction team and project schedule. This overview discusses key construction team considerations for renewable energy as well as timing and expectations for the construction phase. The project construction phase begins after a project is completely designed and the construction documents (100%) have been issued. Construction team skills and experience with renewable energy technologies are crucial during construction, as is how the integration of renewable energy affects the project construction schedule.

404

Magnesium Projects  

Broader source: Energy.gov (indexed) [DOE]

cyberinfrastructure projects and will be augmented by original research in Computer Science and Software Engineering towards the creation of large, distributed, autonomic and...

405

An Integrated ACO Approach for the Joint Production and Preventive Maintenance Scheduling  

E-Print Network [OSTI]

An Integrated ACO Approach for the Joint Production and Preventive Maintenance Scheduling Problem, an integrated ACO approach to solve joint production and preventive maintenance scheduling problem very effective solutions for this problem. Key words-- ACO, Production, Preventive maintenance

Paris-Sud XI, Université de

406

Predictive maintenance policy for a gradually deteriorating system subject to stress  

E-Print Network [OSTI]

of optimal maintenance strategies for improving system availability, preventing Preprint submitted and preventive. Preventive maintenance itself can be categorized into two classes: systematic preventive preventive maintenance policies based on the a priori statistical knowledge of the system lifetime [3]. CBM

Paris-Sud XI, Université de

407

Optimization of Preventive Maintenance Scheduling in Semiconductor Manufacturing Models Using a Simulation-Based Approximate  

E-Print Network [OSTI]

Optimization of Preventive Maintenance Scheduling in Semiconductor Manufacturing Models Using Dynamic Programming (ADP) approach for the optimization of Preventive Maintenance (PM) scheduling schedules. I. INTRODUCTION In semiconductor manufacturing systems, or fabs, pre- ventive maintenance (PM

Fernandez, Emmanuel

408

CBM processes are applicable to maintenance activities on complex systems. Southwest Research Institute  

E-Print Network [OSTI]

performance costs, and preventive/ scheduled maintenance replaces parts before the end of their useful life optimizes costs between preventive and corrective maintenance. Preventive Condition Number of FailuresCBM processes are applicable to maintenance activities on complex systems. Southwest Research

Chapman, Clark R.

409

Uncertainties in Achieving Energy Savings from HVAC Maintenance Measures in the Field  

E-Print Network [OSTI]

Uncertainties in Achieving Energy Savings from HVAC Maintenance Measures in the Field Kristin Group, Davis, CA, USA 4 Southern California Edison, Irwindale, CA, USA ABSTRACT HVAC maintenance utilities across the nation to include HVAC maintenance measures in energy efficiency programs

California at Davis, University of

410

If your codes run much slower than before the maintenance on...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

codes run much slower after the maintenance on 62514 If your codes hang or run much slower after the maintenance on 62514 June 27, 2014 (0 Comments) During the maintenance on...

411

DOE Zero Energy Ready Home Case Study: Shore Road Project- Old Greenwich, Connecticut  

Broader source: Energy.gov [DOE]

This case study describes the builder Murphy Brothers' first DOE Zero Energy Ready Home in Old Greenwich, CT.

412

DOE Zero Energy Ready Home Case Study: Shore Road Project - Old...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

deck, and a continuously running energy recovery ventilator. The house has a dual-fuel heat pump, an instantaneous condensing water heater, and 4.5-kW solar shingles. DOE Zero...

413

DOE Zero Energy Ready Home Case Study: Shore Road Project - Old Greenwich,  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana. DOCUMENTSof EnergyAlliance |DepartmentSystems Home |May,NM,

414

Boyer-Tillamook Access Road Improvement Project 1 Mitigation Action Plan for Final Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists' ResearchTheMarketing,Energy andNews and updatesStudy | Department ofBoyer-Tillamook

415

Amargosa Farm Road Solar Energy Project Solar Power Plant | Open Energy  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartmentAUDIT REPORT Americium/Curium VitrificationAltensol Jump to:

416

DOE Zero Energy Ready Home Case Study: Shore Road Project - Old...  

Broader source: Energy.gov (indexed) [DOE]

Old Greenwich, CT, that scored HERS 40 without PV and HERS 27 with PV. This 4,100 ft2 custom home has 13-inch ICF basement walls and 11-inch insulated concrete form (ICF)...

417

FAciLity mAintenAnce College of Rural and Community Development  

E-Print Network [OSTI]

maintenance trends and developing strate- gies for future maintenance needs. Occupational endorsement Program--Troubleshooting HVAC Systems......................................2 CTT F151--Introduction to Plumbing Tools

Hartman, Chris

418

E-Print Network 3.0 - agreement maintenance based Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Computer Technologies and Information Sciences 51 Proposed Program: Reliability-Centered Maintenance (RCM) for the High Flux Isotope Reactor Summary: -Centered Maintenance...

419

E-Print Network 3.0 - anti-psychotic maintenance medication Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Software... Safety and Security Neural networks IVARA www.ivara.com Reliability centered maintenance solutions... maintenance solutions RCM toolkit (report generation)...

420

E-Print Network 3.0 - alternative telomere maintenance Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Summary: plays a role in telomere maintenance. To investigate the possibility that ORC bound to telo- mere... to varying extents in cells with different telomere-maintenance...

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

E-Print Network 3.0 - aircraft maintenance Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for the U.S. Army Logistics Air Fleet Summary: capacity, airfield landing capability, maximum flight range of aircraft, maintenance requirement... mandated maintenance...

422

Fuel Used for Off-Road Recreation: A Reassessment of the Fuel Use Model  

E-Print Network [OSTI]

Fuel Used for Off-Road Recreation: A Reassessment of the Fuel Use Model Stacy C. Davis Lorena F. Truett Patricia S. Hu #12;ORNL/TM-1999/100 Fuel Used for Off-Road Recreation: A Reassessment of the Fuel.S. Department of Energy under Contract No. DE-AC05-96OR22464 #12;#12;Fuel Used for Off-Road Recreation

423

Los Alamos Site Office Nuclear Maintenance Management Program...  

Office of Environmental Management (EM)

WCRR Monthly Diesel Generator PM, dated 04082011 WI 06.01 Attachment A, JRF-11-06 Preventive Maintenance Cancellation, dated 4122011 WI 06.01 Attachment A, JRF-11-09...

424

FEMP Offers New Training on Photovoltaic Operations and Maintenance...  

Broader source: Energy.gov (indexed) [DOE]

The seminar will cover operations and maintenance (O&M) best practices for photovoltaic (PV) systems of 100 kW or less, including planning for a PV O&M scope of work and...

425

Long-Term Surveillance Operations and Maintenance Fiscal Year...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

and Maintenance Fiscal Year 2013 Year-End Summary Report LTS-O&M is at the core of LM efforts to fulfill a strategy that includes objectives published in the 2011-2020...

426

Multi-canister overpack operations and maintenance manual  

SciTech Connect (OSTI)

This manual provides general operating and maintenance instructions for the Multi-Canister Overpack. Procedure outlines included are conceptual in nature and will be modified, expanded, and refined during preparation of detailed operating procedures.

PIERCE, S.R.

1999-06-23T23:59:59.000Z

427

Pre-conceptual Design Assessment of DEMO Remote Maintenance  

E-Print Network [OSTI]

EDFA, as part of the Power Plant Physics and Technology programme, has been working on the pre-conceptual design of a Demonstration Power Plant (DEMO). As part of this programme, a review of the remote maintenance strategy considered maintenance solutions compatible with expected environmental conditions, whilst showing potential for meeting the plant availability targets. A key finding was that, for practical purposes, the expected radiation levels prohibit the use of complex remote handling operations to replace the first wall. In 2012/13, these remote maintenance activities were further extended, providing an insight into the requirements, constraints and challenges. In particular, the assessment of blanket and divertor maintenance, in light of the expected radiation conditions and availability, has elaborated the need for a very different approach from that of ITER. This activity has produced some very informative virtual reality simulations of the blanket segments and pipe removal that are exceptionally ...

Loving, A; Sykes, N; Iglesias, D; Coleman, M; Thomas, J; Harman, J; Fischer, U; Sanz, J; Siuko, M; Mittwollen, M; others,

2013-01-01T23:59:59.000Z

428

Method and computer program product for maintenance and modernization backlogging  

DOE Patents [OSTI]

According to one embodiment, a computer program product for determining future facility conditions includes a computer readable medium having computer readable program code stored therein. The computer readable program code includes computer readable program code for calculating a time period specific maintenance cost, for calculating a time period specific modernization factor, and for calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. In another embodiment, a computer-implemented method for calculating future facility conditions includes calculating a time period specific maintenance cost, calculating a time period specific modernization factor, and calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. Other embodiments are also presented.

Mattimore, Bernard G; Reynolds, Paul E; Farrell, Jill M

2013-02-19T23:59:59.000Z

429

Gas Turbine Technology, Part B: Components, Operations and Maintenance  

E-Print Network [OSTI]

This paper builds on Part A and discusses the hardware involved in gas turbines as well as operations and maintenance aspects pertinent to cogeneration plants. Different categories of gas turbines are reviewed such as heavy duty aeroderivative...

Meher-Homji, C. B.; Focke, A. B.

430

Job Maintenance and Capital Development Fund (North Carolina)  

Broader source: Energy.gov [DOE]

The Job Maintenance and Capital Development Fund provides annual grants to businesses which are located in Development Tier I counties. The Fund is intended to encourage the retention of...

431

Inventory and Sediment Modeling of Unpaved Roads for Stream Conservation Planning  

E-Print Network [OSTI]

for the Mapping and Inventory of Riparian Areas in the Upperstudy watershed using the road inventory geodatabase. Oncebe compared to species inventory data, stream bank erosion

Inlander, Ethan; Clingenpeel, Alan; Crump, Michael A.; Van Epps, Matthew; Formica, Sandi

2007-01-01T23:59:59.000Z

432

E-Print Network 3.0 - abuse road traffic Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Collection: Engineering ; Computer Technologies and Information Sciences 2 University of Kings Edwards Summary: month program this area of the Bristol Road will be subject to...

433

USVI Energy Road Map: Charting the Course to a Clean Energy Future...  

Energy Savers [EERE]

upcoming milestones. edinusviroadmap.pdf More Documents & Publications USVI Energy Road Map: Charting the Course to a Clean Energy Future (Brochure), EDIN (Energy Development in...

434

Maintenance Implementation Plan for B Plant. Revision 1  

SciTech Connect (OSTI)

The objective of the Maintenance Implementation Plan (MIP) is to describe how the B Plant will implement the requirements established by US Department of Energy (DOE) Order 4330.4A, Maintenance Management Program, Chapter II, ``Nuclear Facilities`` (DOE 1990). The plan provides a blueprint for a disciplined approach to implementation and compliance. Each element of the order is prioritized, categorized, and then placed into one of three phases for implementation.

Tritt, S.E.

1993-04-01T23:59:59.000Z

435

Technical Insights for Saltstone PA Maintenance  

SciTech Connect (OSTI)

The Cementitious Barriers Partnership (CBP) is a collaborative program sponsored by the US DOE Office of Waste Processing. The objective of the CBP is to develop a set of computational tools to improve understanding and prediction of the long-term structural, hydraulic, and chemical performance of cementitious barriers and waste forms used in nuclear applications. CBP tools are expected to better characterize and reduce the uncertainties of current methodologies for assessing cementitious barrier performance and increase the consistency and transparency of the assessment process, as the five-year program progresses. In September 2009, entering its second year of funded effort, the CBP sought opportunities to provide near-term tangible support to DOE Performance Assessments (PAs). The Savannah River Saltstone Disposal Facility (SDF) was selected for the initial PA support effort because (1) cementitious waste forms and barriers play a prominent role in the performance of the facility, (2) certain important long-term behaviors of cementitious materials composing the facility are uncertain, (3) review of the SDF PA by external stakeholders is ongoing, and (4) the DOE contractor responsible for the SDF PA is open to receiving technical assistance from the CBP. A review of the current (SRR Closure & Waste Disposal Authority 2009) and prior Saltstone PAs (e.g., Cook et al. 2005) suggested five potential opportunities for improving predictions. The candidate topics considered were (1) concrete degradation from external sulfate attack, (2) impact of atmospheric exposure to concrete and grout before closure, such as accelerated slag and Tc-99 oxidation, (3) mechanistic prediction of geochemical conditions, (4) concrete degradation from rebar corrosion due to carbonation, and (5) early age cracking from drying and/or thermal shrinkage. The candidate topics were down-selected considering the feasibility of addressing each issue within approximately six months, and compatibility with existing CBP expertise and already-planned activities. Based on these criteria, the five original topics were down-selected to two: external sulfate attack and mechanistic geochemical prediction. For each of the selected topics, the CBP communicated with the PA analysts and subject matter experts at Savannah River to acquire input data specific to the Saltstone facility and related laboratory experiments. Simulations and analyses were performed for both topics using STADIUM (SIMCO 2008), LeachXS/ORCHESTRA (ECN 2007, Meeussen 2003), and other software tools. These supplemental CBP analyses produced valuable technical insights that can be used to strengthen the Saltstone PA using the ongoing PA maintenance process. This report in part summarizes key information gleaned from more comprehensive documents prepared by Sarkar et al. (2010), Samson (2010), and Sarkar (2010).

Flach, G.; Sarkar, S.; Mahadevan, S.; Kosson, D.

2011-07-20T23:59:59.000Z

436

Maintenance implementation plan for the Plutonium Finishing Plant. Revision 3  

SciTech Connect (OSTI)

This document outlines the Maintenance Implementation Plan (MIP) for the Plutonium Finishing Plant (PFP) located at the Hanford site at Richland, Washington. This MIP describes the PFP maintenance program relative to DOE order 4330.4B. The MIP defines the key actions needed to meet the guidelines of the Order to produce a cost-effective and efficient maintenance program. A previous report identified the presence of significant quantities of Pu-bearing materials within PFP that pose risks to workers. PFP`s current mission is to develop, install and operate processes which will mitigate these risks. The PFP Maintenance strategy is to equip the facility with systems and equipment able to sustain scheduled PFP operations. The current operating run is scheduled to last seven years. Activities following the stabilization operation will involve an Environmental Impact Statement (EIS) to determine future plant activities. This strategy includes long-term maintenance of the facility for safe occupancy and material storage. The PFP maintenance staff used the graded approach to dictate the priorities of the improvement and upgrade actions identified in Chapter 2 of this document. The MIP documents PFP compliance to the DOE 4330.4B Order. Chapter 2 of the MIP follows the format of the Order in addressing the eighteen elements. As this revision is a total rewrite, no sidebars are included to highlight changes.

Meldrom, C.A.

1996-03-01T23:59:59.000Z

437

Dillard Road Solar Power Facility | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address:011-DNA Jump to:52c8ff988c1Dering Harbor, NewRidge, Alaska:DickinsonDillard Road Solar

438

The Road to Hiroshima and Beyond | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of EnergyThe Energy DepartmentCategory 2 NuclearThe Road to Hiroshima and

439

EV Everywhere Grand Challenge Road to Success | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review: TopEnergyIDIQ Contract ESPC IDIQ ContractConsumerof Energy ChargeRoad to

440

Marsh Road Power Plant Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to:46 - 429Lacey,(MonasterLowellis a town inRiver93. It isEnergyMarquette County isRoad

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Bruceville Road Solar Power Facility | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartmentAUDIT REPORT Americium/CuriumSunways JV JumpBraselco JumpBruceville Road Solar

442

New Directions in Engines -- The Road Ahead | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department ofT ib l L d F S i DOETowardExecutiveRateEnergy Emissions Control-- The Road

443

U.S. Virgin Islands Energy Road Map: Analysis  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of EnergyTheTwo New Energy AmericanOfficeinGeothermal iii U.S.Energy Road

444

Project X  

E-Print Network [OSTI]

provided by Project X would be a cost- effective approach toin Section I and for the cost estimate necessary as part ofby DOE order 413.3b. The cost range required for CD-0 will

Holmes, Steve

2014-01-01T23:59:59.000Z

445

Project Manager  

Broader source: Energy.gov [DOE]

A successful candidate in this position will serve as a project manager in the Fuel Cell Technologies Office in the DOE-EERE Office of Transportation responsible for a wide variety of highly...

446

Project Title:  

Broader source: Energy.gov (indexed) [DOE]

0 181 0 Hazardous Air Pollutants? Is the project subject to emissions limitations in an Air Quality 0 181 0 Control Region? 2 Revised on: 11122008 NEPA COMPLIANCE SURVEY Impacts...

447

Application of discrete event simulation techniques for prioritization of U.S. Air Force Military Family Housing Projects  

E-Print Network [OSTI]

This study, through the use of discrete event simulation and modeling, explores various prioritization disciplines for U.S. Air Force Military Family Housing maintenance, repair, and renovation projects. Actual data from the Military Family Housing...

Krukenberg, Harry J.

1996-01-01T23:59:59.000Z

448

Radiological survey results at 4400 Piehl Road, Ottawa Lake, Michigan  

SciTech Connect (OSTI)

At the request of the US Department of Energy (DOE), a team from Oak Ridge National Laboratory conducted a radiological survey at 4400 Piehl Road in Ottawa Lake, Michigan. The survey was performed in September, 1992. The purpose of the survey was to determine if materials containing uranium from work performed under government contract at the former Baker Brothers facility in Toledo, Ohio had been transported off-site to this neighboring area. The radiological survey included surface gamma scans indoors and outdoors, alpha and beta scans inside the house and attached garage, beta-gamma scans of the hard surfaces outside, and the collection of soil, water, and dust samples for radionuclide analyses. Results of the survey demonstrated that the majority of the measurements on the property were within DOE guidelines. However, the presence of isolated spots of uranium contamination were found in two areas where materials were allegedly transported to the property from the former Baker Brothers site. Uranium uptake by persons on the property by ingestion is fairly unlikely, but inhalation is a possibility. Based on these findings, it is recommended that the residential property at 4400 Piehl Road in Ottawa Lake, Michigan be considered for inclusion under FUSRAP.

Foley, R.D.; Johnson, C.A.

1993-04-01T23:59:59.000Z

449

Texas A&M AgriLife Research Procedures 51.04.01.A0.01 Minor Construction Projects  

E-Print Network [OSTI]

Texas A&M AgriLife Research Procedures 51.04.01.A0.01 Minor Construction Projects ApprovedLife Research Procedure 51.04.01.A0.01 Minor Construction Projects Page 1 of 8 PROCEDURE STATEMENT Texas A) for the preparation, execution and administration of all minor construction and maintenance projects. PROCEDURES

450

Return on Investment for State Highway Projects 25th Annual Transportation Research Conference  

E-Print Network [OSTI]

Return on Investment for State Highway Projects 25th Annual Transportation Research Conference May ­ Maintain and repair existing roads and bridges · Grow the Economy by Making Your Transportation Investments;8 · Describes strategies states can use to achieve the greatest outcomes at the least cost with transportation

Minnesota, University of

451

Project Summary Report 0-4386-S 1 The University of Texas at Austin  

E-Print Network [OSTI]

of the available funds for these projects, and to minimize total road life-cycle cost, DOTs need a system (i.e., benefits, advantages, and limi- tations) for each method, con- sidering all life-cycle aspects.T. Haas, G.E. Gibson, Jr., J.T. O'Connor, Z. Zhang, C.K. Anderson, and B. Somali October 2003 Development

Texas at Austin, University of

452

A framework for selecting strategies to impact the success of high volume roadway projects  

E-Print Network [OSTI]

that summarize the research findings. A general matrix was created to show the motivating project conditions that warrant the use of each strategy. A public relations matrix was created to display the influence the impacted road user groups have on public...

Chabannes, Clayton C.

2006-08-16T23:59:59.000Z

453

Integrating ecophysiology and plankton dynamics into projected changes in maximum fisheries catch potential under climate  

E-Print Network [OSTI]

). In addition, average surface water pH of the ocean has dropped by 0.1 units since pre- industrial timesIntegrating ecophysiology and plankton dynamics into projected changes in maximum fisheries catch 7TJ, UK 2 Centre for Environment, Fisheries and Aquaculture Science, Pakefield Road, Lowestoft

Pauly, Daniel

454

2011 Regents of the University of Minnesota. All rights reserved. The University of Minnesota is an equal opportunity educator and employer. Segments of roads with LSFs (right) have better driver visibility and road surface  

E-Print Network [OSTI]

is an equal opportunity educator and employer. Segments of roads with LSFs (right) have better driver improve driver visibility, road surface conditions and have the potential to reduce accidents, snow

Amin, S. Massoud

455

Home Maintenance and Repair Owning a home is a major responsibility.  

E-Print Network [OSTI]

maintenance is conducted. Regular, preventive maintenance can pay off in peace of mind, utility cost savings, routine maintenance helps to prolong the life of the home and may prevent the need for major repairs of Benjamin Franklin, "An ounce of prevention is worth a pound of cure." Regular, routine maintenance enhances

456

Single-machine scheduling with periodic and exible periodic maintenance to minimize maximum tardiness  

E-Print Network [OSTI]

periods often appear in industry due to a machine breakdown (stochastic) or preventive maintenance of machine unavailability. However, in some cases (e.g. preventive maintenance), the maintenance of a machineSingle-machine scheduling with periodic and exible periodic maintenance to minimize maximum

Paris-Sud XI, Université de

457

DYNAMIC AND MULTI-CRITERIA SCHEDULING OF MAINTENANCE ACTIVITIES F. Marmier, C. Varnier, N Zerhouni  

E-Print Network [OSTI]

. There are mainly two types of maintenance activities: the preventive maintenance, whose activities can be long termDYNAMIC AND MULTI-CRITERIA SCHEDULING OF MAINTENANCE ACTIVITIES F. Marmier, C. Varnier, N Zerhouni good performance with production means. Especially in maintenance services field where the different

Paris-Sud XI, Université de

458

Analysis of OREDA Data for Maintenance Optimisation Langseth, H., Haugen, K., Sandtorv, H.  

E-Print Network [OSTI]

maintenance interval , and the critical failure rate given that no preventive maintenance is performed (asAnalysis of OREDA Data for Maintenance Optimisation Langseth, H., Haugen, K., Sandtorv, H. SINTEF". The suggested modelling provides means to predict how maintenance tasks will affect the rate of critical

Langseth, Helge

459

Designing an on-line multimedia maintenance manual for a production environment  

E-Print Network [OSTI]

). It is a combination of design-out maintenance (DOM) and preventive maintenance. The focus of DOM is to improve36 Designing an on-line multimedia maintenance manual for a production environment W.P. Brinkman, V.P. Buil, R. Cullen1 , R. Gobits2 and F.L. van Nes e-mail: w.p.brinkman@tue.nl Abstract Maintenance

Brinkman, Willem-Paul

460

Anomaly detection in monitoring sensor data for preventive maintenance Julien Rabatel a,b,  

E-Print Network [OSTI]

Anomaly detection in monitoring sensor data for preventive maintenance Julien Rabatel a,b, , Sandra Preventive maintenance a b s t r a c t Today, many industrial companies must face problems raised to make predictive maintenance to prevent a serious breakdown. In addition, the corrective maintenance

Paris-Sud XI, Université de

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Project Fact Sheet Project Update  

E-Print Network [OSTI]

medical and dental centre; shop and café area for students and vacation accommodation centre. The new & Figures: Budget: £51,074,000 Funding Source: Capital Plan Construction Project Programme: Start on Site

462

Bumpy Road Ahead: Bracing for Insolvency in the Highway Trust Fund  

E-Print Network [OSTI]

. They recommend a congestion-adjusted vehicle mileage tax (VMT) as an economically efficient means of tackling infrastructure funding issues in a way that reflects the costs of road use. However, given the serious privacy issues associated with tracking road use...

Dar, Jawad; Taylor, Lori L.

463

Marginal costs of freeway traffic congestion with on-road pollution exposure externality  

E-Print Network [OSTI]

Traffic congestion On-road In-vehicle Pollution exposure Vehicle emissions a b s t r a c t The health cost improvements. When considering distinct vehicle classes, inclusion of on-road exposure costs greatly increases heavy-duty vehicle marginal costs because of their higher emissions rates and greater roadway capacity

Bertini, Robert L.

464

On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 4,  

E-Print Network [OSTI]

On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 4, November 2002 Gary A Sensing of Automobile Emissions in the Phoenix Area: Year 4 1 EXECUTIVE SUMMARY The University of Denver #12;On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 4 2 by 5 years

Denver, University of

465

Impact of relief accuracy on flood simulations and road network vulnerability analysis  

E-Print Network [OSTI]

network by forcing users to take detours. In a risk preventive viewpoint, the network administrator has 1 Impact of relief accuracy on flood simulations and road network vulnerability analysis Jean in the water level and its consequences on the road network vulnerability. The first part focuses

Paris-Sud XI, Universit de

466

Experiments for Online Estimation of Heavy Vehicle's Mass and Time-Varying Road Grade  

E-Print Network [OSTI]

's vehicle, and also marketing strategies in industry, has fuelled extensive research for automation of partExperiments for Online Estimation of Heavy Vehicle's Mass and Time-Varying Road Grade Ardalan for online estimation of Heavy Duty Vehicle mass and road grade. The test data is obtained from high- way

Stefanopoulou, Anna

467

Seymour Marine Discovery Center at Long Marine Lab 100 Shaffer Road * Santa Cruz, CA 95060  

E-Print Network [OSTI]

Seymour Marine Discovery Center at Long Marine Lab 100 Shaffer Road * Santa Cruz, CA 95060 (831) 459-3800 2014 Endowment Challenge to benefit Seymour Marine Discovery Center SANTA CRUZ, CA Discovery Center at Long Marine Lab 100 Shaffer Road * Santa Cruz, CA 95060 (831) 459-3800 Open

California at Santa Cruz, University of

468

Dynamic Friction Models for Longitudinal Road/Tire Interaction: Experimental Results  

E-Print Network [OSTI]

Dynamic Friction Models for Longitudinal Road/Tire Interaction: Experimental Results C. Canudas dynamic friction force model for the longitudinal road/tire interaction for wheeled ground vehicles is val- idated via experiments with an actual passenger vehicle. Contrary to common static friction/slip maps

Tsiotras, Panagiotis

469

Dynamic Friction Models for Longitudinal Road/Tire Interaction: Theoretical Advances  

E-Print Network [OSTI]

Dynamic Friction Models for Longitudinal Road/Tire Interaction: Theoretical Advances C. Canudas we derive a new dynamic friction force model for the longitudinal road/tire interaction for wheeled-point friction problems, called the LuGre model [1]. By assuming a con- tact patch between the tire

Tsiotras, Panagiotis

470

Conceptual design report, TWRS Privatization Phase I, site development and roads, subproject W-505  

SciTech Connect (OSTI)

This document includes Conceptual Design Report (CDR) for the site development, construction of new roads and improvements at existing road intersections, habitat mitigation, roadway lighting, and construction power needed for the construction of two Private Contractor (PC) Facilities. Approximately 50 hectare (124 acres) land parcel, east of the Grout Facility, is planned for the PC facilities.

Singh, G.

1997-06-05T23:59:59.000Z

471

Department of Ocean and Mechanical Engineering 777 Glades Road, Boca Raton, FL 33431  

E-Print Network [OSTI]

Department of Ocean and Mechanical Engineering 777 Glades Road, Boca Raton, FL 33431 561.297.3430, fax 561.297.3885 SeaTech ­ The Institute for Ocean & Systems Engineering 101 North Beach Road, Dania of Ocean and Mechanical Engineering at Florida Atlantic University is pleased to announce fellowship

Fernandez, Eduardo

472

A Hybrid macro-micro pedestrians evacuation model to speed up simulation in road networks  

E-Print Network [OSTI]

A Hybrid macro-micro pedestrians evacuation model to speed up simulation in road networks NGUYEN efficient than the use of micro model alone. Keywords: Crowd movement, Hybrid modeling, road networks, multi simulation in a dynamic environments are either based on micro or macro models. These two types of models

Paris-Sud XI, Université de

473

LASER SCANNING AND NOISE REDUCTION APPLIED TO 3D ROAD SURFACE ANALYSIS  

E-Print Network [OSTI]

LASER SCANNING AND NOISE REDUCTION APPLIED TO 3D ROAD SURFACE ANALYSIS Thorsten Schulz and Hilmar, EAWAG Email: michele.steiner@eawag.ch Abstract: Terrestrial laser scanning was applied to acquire 3D the catchment area of a road with respect to a pilot plant. As laser scanning requires only a few minutes

Giger, Christine

474

The role of hydrogen in powering road transport Alison Pridmore and Abigail Bristow  

E-Print Network [OSTI]

3.1 Greenhouse Gas Emissions From Hydrogen Powered Fuel Cell Vehicles ...9 3.2 Greenhouse GasThe role of hydrogen in powering road transport Alison Pridmore and Abigail Bristow April 2002 Tyndall Centre for Climate Change Research Working Paper 19 #12;The Role of Hydrogen in Powering Road

Watson, Andrew

475

ON-ROAD REMOTE SENSING OF VEHICLE EMISSIONS IN MONTERREY, N.L. MEXICO  

E-Print Network [OSTI]

ON-ROAD REMOTE SENSING OF VEHICLE EMISSIONS IN MONTERREY, N.L. MEXICO Final Report Prepared for the University of Denver traveled to Monterrey, N.L. Mexico to monitor remotely the carbon monoxide (CO with other cities that have been sampled in Mexico. The on-road emission averages are similar to the latest

Denver, University of

476

Qualification Plan for Phase One of True-MidPacific Geothermal Venture: James Campbell - Kahaualea Project, Island of Hawaii  

SciTech Connect (OSTI)

The objective of this project is to develop the geothermal resources of the James Campbell Estate, comprising acres in the Puna District of the Island of Hawaii. The geothermal resource is assumed to exist in the vicinity of the East Rift of the Kilauea volcano. The location of the proposed geothermal well field and the geothermal-electric power plant are shown on Dwg. No. E-04-001. Access to the project area will be provided by a new road extension from the boundary road south from Glenwood on Highway 11.

None

1981-06-01T23:59:59.000Z

477

Size-Resolved Particle Number and Volume Emission Factors for On-Road Gasoline and Diesel Motor Vehicles  

E-Print Network [OSTI]

matter from on-road gasoline and diesel vehicles.D.H. , Chase, R.E. , 1999b. Gasoline vehicle particle sizeFactors for On-Road Gasoline and Diesel Motor Vehicles

Ban-Weiss, George A.

2009-01-01T23:59:59.000Z

478

Decontamination and decommissioning surveillance and maintenance report for FY 1991  

SciTech Connect (OSTI)

The Decontamination and Decommissioning (D D) Program has three distinct phases: (1) surveillance and maintenance (S M); (2) decontamination and removal of hazardous materials and equipment (which DOE Headquarters in Washington, D.C., calls Phase I of remediation); and (3) decommissioning and ultimate disposal, regulatory compliance monitoring, and property transfer (which DOE Headquarters calls Phase II of remediation). A large part of D D is devoted to S M at each of the sites. Our S M activities, which are performed on facilities awaiting decommissioning, are designed to minimize potential hazards to human health and the environment by: ensuring adequate containment of residual radioactive and hazardous materials; and, providing physical safety and security controls to minimize potential hazards to on-site personnel and the general public. Typically, we classify maintenance activities as either routine or special (major repairs). Routine maintenance includes such activities as painting, cleaning, vegetation control, minor structural repairs, filter changes, and building system(s) checks. Special maintenance includes Occupational Safety and Health Act facility upgrades, roof repairs, and equipment overhaul. Surveillance activities include inspections, radiological measurements, reporting, records maintenance, and security (as required) for controlling and monitoring access to facilities. This report summarizes out FY 1991 S M activities for the Tennessee plant sites, which include the K-25 Site, the Gas Centrifuge facilities, ORNL, and the Y-12 Plant.

Not Available

1991-12-01T23:59:59.000Z

479

Operations, Maintenance, and Replacement 10-Year Plan, 1990 -1999.  

SciTech Connect (OSTI)

In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the late summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-Year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

United States. Bonneville Power Administration.

1990-08-01T23:59:59.000Z

480

Operations, Maintenance, and Replacement 10-Year Plan, 1990--1999  

SciTech Connect (OSTI)

In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the later summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

Not Available

1990-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "road maintenance project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

SAPHIRE 8 Software Project Plan  

SciTech Connect (OSTI)

This project is being conducted at the request of the DOE and the NRC. The INL has been requested by the NRC to improve and maintain the Systems Analysis Programs for Hands-on Integrated Reliability Evaluation (SAPHIRE) tool set concurrent with the changing needs of the user community as well as staying current with new technologies. Successful completion will be upon NRC approved release of all software and accompanying documentation in a timely fashion. This project will enhance the SAPHIRE tool set for the user community (NRC, Nuclear Power Plant operations, Probabilistic Risk Analysis (PRA) model developers) by providing improved Common Cause Failure (CCF), External Events, Level 2, and Significance Determination Process (SDP) analysis capabilities. The SAPHIRE development team at the Idaho National Laboratory is responsible for successful completion of this project. The project is under the supervision of Curtis L. Smith, PhD, Technical Lead for the SAPHIRE application. All current capabilities from SAPHIRE version 7 will be maintained in SAPHIRE 8. The following additional capabilities will be incorporated: Incorporation of SPAR models for the SDP interface. Improved quality assurance activities for PRA calculations of SAPHIRE Version 8. Continue the current activities for code maintenance, documentation, and user support for the code.

Curtis L.Smith; Ted S. Wood

2010-03-01T23:59:59.000Z

482

Project Startup: Evaluating the Performance of Frito Lay's Electric Delivery Trucks (Fact Sheet)  

SciTech Connect (OSTI)

The Fleet Test and Evaluation Team at the National Renewable Energy Laboratory (NREL) is evaluating the in-service performance of 10 medium-duty Smith Newton electric vehicles (EVs) and 10 comparable conventional diesel vehicles operated by Frito Lay North America in the Seattle, Washington, area. Launched in late 2013, the on-road portion of this 12-month evaluation focuses on collecting and analyzing vehicle performance data, such as fuel economy and maintenance costs, to better understand how to optimize the use of such vehicles in a large-scale commercial operation. In addition to the on-road portion of this evaluation, NREL is analyzing charging data to support total cost of ownership estimations and investigations into smart charging opportunities. NREL is also performing a battery life degradation analysis to quantify battery pack health, track battery performance over time, and determine how various drive cycles and battery charging protocols impact battery life.

Not Available

2014-04-01T23:59:59.000Z

483

Project Final Report UBC LBS Project Services1 Project Final Report UBC LBS Project Services2  

E-Print Network [OSTI]

Project Final Report UBC LBS Project Services1 #12;Project Final Report UBC LBS Project Services2 EXECUTIVE SUMMARY The purpose of the UBC Project Services web-based project management portal project on campus within Project Services, and with the rest of the UBC community. We began this project by defining

484

Cloudnet Project  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Cloudnet is a research project supported by the European Commission. This project aims to use data obtained quasi-continuously for the development and implementation of cloud remote sensing synergy algorithms. The use of active instruments (lidar and radar) results in detailed vertical profiles of important cloud parameters which cannot be derived from current satellite sensing techniques. A network of three already existing cloud remote sensing stations (CRS-stations) will be operated for a two year period, activities will be co-ordinated, data formats harmonised and analysis of the data performed to evaluate the representation of clouds in four major european weather forecast models.

Hogan, Robin

485

This construction, refurbishment and maintenance guide identifies the main sustainability factors that need to be considered during the design, refurbishment, construction or ongoing maintenance of buildings on our  

E-Print Network [OSTI]

1 This construction, refurbishment and maintenance guide identifies the main sustainability factors that need to be considered during the design, refurbishment, construction or ongoing maintenance or manage the refurbishment, construction or ongoing maintenance of buildings on behalf of the College. We

Sheldon, Nathan D.

486

AVTA: ARRA EV Project Residential Charging Infrastructure Maps  

Broader source: Energy.gov [DOE]

The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The American Recovery and Reinvestment Act supported a number of projects that together made up the largest ever deployment of plug-in electric vehicles and charging infrastructure in the U.S. The following maps describe where the EV Project deployed thousands of residential chargers.

487

AVTA: ARRA EV Project Public Charging Infrastructure Maps  

Broader source: Energy.gov [DOE]

The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The American Recovery and Reinvestment Act supported a number of projects that together made up the largest ever deployment of plug-in electric vehicles and charging infrastructure in the U.S. The following maps describe where the EV Project deployed thousands of public chargers.

488

AVTA: Chevrolet Volt ARRA Vehicle Demonstration Project Data  

Broader source: Energy.gov [DOE]

The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The American Recovery and Reinvestment Act supported a number of projects that together made up the largest ever deployment of plug-in electric vehicles and charging infrastructure in the U.S. The following reports summarize data collected from a project General Motors conducted to deploy 150 2011 Chevrolet Volts around the country. This research was conducted by Idaho National Laboratory.

489

Kalispel Resident Fish Project : Tribal Hatchery Operations and Maintenance Annual Report, 2002.  

SciTech Connect (OSTI)

The Kalispel Tribal hatchery successfully spawned largemouth bass broodfish in spring 2002. Approximately 150,000 eggs were produced and hatched. These fry were started on brine shrimp for a period of ten days. At this time, the fry needed more abundance food supply. Cannibalism started and the hatchery staff transferred the remaining fry to the river in hopes that some fish would survive.

Nenema, David

2003-03-01T23:59:59.000Z

490

Kalispel Resident Fish Project: Kalispel Tribal Hatchery Operations and Maintenance, 2000 Annual Report.  

SciTech Connect (OSTI)

No Annual Production Goals were achieved for the year. The Kalispel Hatchery experienced two episodes of brood fish mortality. The first due to a standpipe malfunction and the second attributed to gas bubble disease caused by elevated Total Dissolved Gases (TDG's) in the reservoir. To date, the hatchery has 29 brood fish in the raceway and ready to spawn. If all things go well this spring, hatchery operations should be well underway next year.

Bluff, Stanley

2000-12-01T23:59:59.000Z

491

Kalispel Resident Fish Project: Kalispel Tribal Hatchery Operations and Maintenance, 1999 Annual Report.  

SciTech Connect (OSTI)

In October of 1997, The construction of the Kalispel Tribal Hatchery was complete. No spawning activity was recorded for the spring of 1998. On June 14, 1999 the first spawn at the Kalispel Tribal Hatchery was successful. A total of seven nests were fertilized that produced approximately 144,000 fry. The second spawn occurred on July 13, 1999 and a total of six nests were fertilized producing approximately 98,0000 fry. The total amount of largemouth bass fry produced at the Kalispel Tribal Hatchery was 242,000.

Bluff, Stanley

2000-12-01T23:59:59.000Z

492

Expert Meeting Report: Key Innovations for Adding Energy Efficiency to Maintenance Projects  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector General Office of Audit|Department of Energy56Executive Summit on WindMarchFoundations

493

Project Profile: Innovative Application of Maintenance-Free Phase-Change  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department ofT ib l L d FNEPA/309DepartmentDepartment ofCycles |Perovskites

494

Project Profile: Maintenance-Free Stirling Engine for High-Performance Dish  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department ofT ib l L d FNEPA/309DepartmentDepartment ofCyclesEnergyCSP | Department of

495

A bottom up approach to on-road CO2 emissions estimates: improved spatial accuracy and applications for regional  

E-Print Network [OSTI]

A bottom up approach to on-road CO2 emissions estimates: improved spatial accuracy and applications Environment Environmental Science & Technology #12;1 A bottom up approach to on-road CO2 emissions estimates-road transportation is responsible for 28% of all U.S. fossil-fuel CO2 emissions. Mapping vehicle emissions

Wing, Ian Sue

496

AVTA: ARRA EV Project Overview Reports  

Broader source: Energy.gov [DOE]

The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The American Recovery and Reinvestment Act supported a number of projects that together made up the largest ever deployment of plug-in electric vehicles and charging infrastructure in the U.S. The following reports provide summary overviews of the EV Project, which partnered with city, regional and state governments, utilities, and other organizations in 16 cities to deploy about 14,000 Level 2 PEV chargers and 300 DC fast chargers. It also deployed 5,700 all-electric Nissan Leafs and 2,600 plug-in hybrid electric Chevrolet Volts.

497

Contract and beyond GEMnet status and accomplishments: GSA's energy and maintenance network  

SciTech Connect (OSTI)

The U.S. General Services Administration Pacific Rim Region (Region 9), manages over 20 million gross square feet of federally owned office space, plus additional leased office space, for the federal government in California, Nevada, Arizona, Hawaii and the Pacific territories. To assist in this real estate management the Pacific Rim Region is developing the GSA Energy and Maintenance Network, or GEMnet. GEMnet is a collection of information technology initiatives, including remote monitoring and control to reduce operational costs by improving energy efficiency, reducing peak demand, and optimizing maintenance in buildings. Ultimately the various systems use a common database platform. This paper describes the status and plans for GEMnet, focusing on how it compares with related monitoring and information technology currently used in nonresidential buildings. This paper will also report on recent activities within the GEMnet purview, demand-shedding and retro-commissioning. For example, two large GSA office buildings in the San Francisco Bay Area participated in the California Independent System Operator (ISO) demand relief program (DRP) during the summer of 2001, shedding nearly 1 MW when called upon. In conjunction with the fielding of GEMnet related programs, a series of retro-commissioning projects is being implemented, scoped to the needs of particular buildings. Details on the BAS retro-commissioning at one building is presented.

Piette, Mary Ann; Kinney, Satkartar; Levi, Mark; McBride, David; May, Stephen

2002-05-01T23:59:59.000Z

498

PROJECT REQUEST FORM PROJECT HOLDER INFORMATION  

E-Print Network [OSTI]

PROJECT REQUEST FORM Last Name: Email: PROJECT HOLDER INFORMATION UCID:Last Name: Email: Institute if different than Project Holder) First Name: Project Short Name: (50 characters max) (for eFIN view only) Project Title: PROJECT INFORMATION Start Date (MM/DD/YYYY): End Date (MM/DD/YYYY): For Questions or HELP

de Leon, Alex R.

499

SharonM.Kirk 988ForgeRoad  

E-Print Network [OSTI]

the projects with acceptable level of quality.Removedand/orupgraded12systems:electrical,plumbing,heating, ventilation, reduced electric and magnetic fields

Marsh, David

500

TidGen Power System Commercialization Project  

SciTech Connect (OSTI)

ORPC Maine, LLC, a wholly-owned subsidiary of Ocean Renewable Power Company, LLC (collectively ORPC), submits this Final Technical Report for the TidGen Power System Commercialization Project (Project), partially funded by the U.S. Department of Energy (DE-EE0003647). The Project was built and operated in compliance with the Federal Energy Regulatory Commission (FERC) pilot project license (P-12711) and other permits and approvals needed for the Project. This report documents the methodologies, activities and results of the various phases of the Project, including design, engineering, procurement, assembly, installation, operation, licensing, environmental monitoring, retrieval, maintenance and repair. The Project represents a significant achievement for the renewable energy portfolio of the U.S. in general, and for the U.S. marine hydrokinetic (MHK) industry in particular. The stated Project goal was to advance, demonstrate and accelerate deployment and commercialization of ORPCs tidal-current based hydrokinetic power generation system, including the energy extraction and conversion technology, associated power electronics, and interconnection equipment capable of reliably delivering electricity to the domestic power grid. ORPC achieved this goal by designing, building and operating the TidGen Power System in 2012 and becoming the first federally licensed hydrokinetic tidal energy project to deliver electricity to a power grid under a power purchase agreement in North America. Located in Cobscook Bay between Eastport and Lubec, Maine, the TidGen Power System was connected to the Bangor Hydro Electric utility grid at an on-shore station in North Lubec on September 13, 2012. ORPC obtained a FERC pilot project license for the Project on February 12, 2012 and the first Maine Department of Environmental Protection General Permit issued for a tidal energy project on January 31, 2012. In addition, ORPC entered into a 20-year agreement with Bangor Hydro Electric Company on January 1, 2013 for up to 5 megawatts at a price of $215/MWh, escalating at 2.0% per year.

Sauer, Christopher R. [President & CEO] [President & CEO; McEntee, Jarlath [VP Engineering & CTO] [VP Engineering & CTO

2013-12-30T23:59:59.000Z