National Library of Energy BETA

Sample records for rivers section 7a

  1. Section 3116 Waste Determinationfor Salt Disposal at the Savannah River

    Office of Environmental Management (EM)

    Site, signed by Secretary of Energy, Samuel W. Bodman | Department of Energy Section 3116 Waste Determinationfor Salt Disposal at the Savannah River Site, signed by Secretary of Energy, Samuel W. Bodman Section 3116 Waste Determinationfor Salt Disposal at the Savannah River Site, signed by Secretary of Energy, Samuel W. Bodman PDF icon Section 3116 Waste Determinationfor Salt Disposal at the Savannah River Site, signed by Secretary of Energy, Samuel W. Bodman More Documents &

  2. Clean Water Act (Section 404) and Rivers and Harbors Act (Sections 9 and 10)

    SciTech Connect (OSTI)

    Not Available

    1992-03-01

    This Reference Book contains a current copy of the Clean Water Act (Section 404) and the Rivers and Harbors Act (Sections 9 and 10) and those regulations that implement those sections of the statutes and appear to be most relevant to DOE activities. The document is provided to DOE and contractor staff for informational purposes only and should not be interpreted as legal guidance. Updates that include important new requirements will be provided periodically. Questions concerning this Reference Book may be directed to Mark Petts, IH-231 (FTS 896-2609 or Commercial 202/586-2609).

  3. Section 9 of the Rivers and Harbors Act of 1899 (33 USC 401)...

    Open Energy Info (EERE)

    Section 9 of the Rivers and Harbors Act of 1899 (33 USC 401) Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Section 9 of the...

  4. Section 14 of the Rivers and Harbors Act of 1899 (33 USC 408...

    Open Energy Info (EERE)

    Section 14 of the Rivers and Harbors Act of 1899 (33 USC 408) Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Section 14 of the...

  5. Savannah River Site Basis for Section 3116 Determination for Salt Waste Disposal

    Broader source: Energy.gov [DOE]

    The Department of Energy (DOE) published in the Federal Register (January 24, 2006), a Notice of Availability of Section 3116 Determination for Salt Waste Disposal at the Savannah River Site.

  6. Notice of Availability of Section 3116 Determination for Salt Waste Disposal at the Savannah River Site

    Broader source: Energy.gov [DOE]

    The Department of Energy (DOE) announces the availability of a section 3116 determination for the disposal of separated, solidified, low-activity salt waste at the Savannah River Site (SRS) near...

  7. River Corridor Closure Contract Section J, Attachment J-11

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 Contract No. DE-AC06-05RL14655 Modification 398 1 SECTION J, ATTACHMENT J-11 RCC FUNDING PROFILE In accordance with the Section B clause entitled Changes to Target Cost, Target Fee, and Schedule, the following is the projected funding profile for this Contract: Fiscal Year Annual Budget Authority ($1M)* Cumulative Budget Authority ($1M)* 2005** $ 107** $ 107 2006 183 290 2007 212 502 2008 232 734 2009 242 976 2010 297 1,273 2011 376 1,649 2012 302 1,951 2013 300 2,251 2014 280 2,531 2015 201

  8. River Corridor Closure Contract Section J, Attachment J-8

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 Contract No. DE-AC06-05RL14655 A000 1 ATTACHMENT J-8 EMPLOYEE BENEFITS AND PENSION PLANS Pursuant to application employee benefit and pension requirements in Contract Section H, Special Contract Requirement, the Contractor shall annually submit the Report of Contractor Expenditures for Employee Supplemental Compensation

  9. River Corridor Closure Contract Section J, Attachment J-10

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0 Contract No. DE-AC06-05RL14655 A000 1 SECTION J, ATTACHMENT J-10 RCC SUBCONTRACTS EXISTING AT TIME OF SOLICITATION The following subcontracts are/were available for assignment to the Contractor at the time Solicitation No. DE-RP06-04RL14655 was issued: End Date Current Value Description Supplier 02/28/05 $ 5,994,091 100 B/C AREA PIPELINES RCI ENVIRONMENTAL, INC. 10/31/06 $ 1,324,615 100-BC BURIAL GROUNDS AND REMAINING SITES FEDERAL ENGINEERS & CONSTRUCTORS 12/31/05 $ 3,400,000 116-N-1 CRIB

  10. River Corridor Closure Contract Section J, Attachment J-4

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 Contract No. DE-AC06-05RL14655 A000 SECTION J, ATTACHMENT J-4 SMALL BUSINESS SUBCONTRACTING PLAN The Washington Closure LLC Small Business Subcontracting Plan is on file at the Richland Operations Office and will be available at www.hanford.gov/rl The Washington Smalll Business Subcontracting Goals are as follows (as a percent of total subcontracting effort): Small Business (SB): 65.0% Small Disadvantaged Business: 22.0% Women-Owned SB: 13.0% HUBZone SB: 4.5% Veteran-Owned SB: 3.0%

  11. River Corridor Closure Contract Section J, Attachment J-5

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 Contract No. DE-AC06-05RL14655 A000 1 SECTION J, ATTACHMENT J-5 SMALL DISADVANTAGED BUSINESS PARTICIPATION PROGRAM TARGETS (A) Washington Closure NAICS Code Description of NAICS Major Group SDB Dollars Percentage** Subtotal (B) Subcontractors NAICS Code Description of NAICS Major Group SDB Dollars Percentage** 238 Specialty Trade Contractors 37,352,000 1.92 423 Merchant Wholesalers, Durable Goods* 43,104,000 2.21 541 Professional, scientific, & tech srvcs* 13,931,000 0.72 562 Waste mgt

  12. Columbia River monitoring: Summary of chemical monitoring along cross sections at Vernita Bridge and Richland

    SciTech Connect (OSTI)

    Dirkes, R.L.; Patton, G.W.; Tiller, B.L.

    1993-05-01

    This report presents the results of the chemical monitoring performed by the Surface Environmental Surveillance Project (SESP) along cross sections of the Columbia River established at Vernita Bridge and the Richland Pumphouse. Potential Hanford-origin chemical constituents of interest were selected based on their presence in ground water near the river, past surveillance efforts that have documented their entry into the river, and reviews of special study reports, CERCIA remedial investigation/feasibility study (RI/FS) documentation, RCRA facility investigation/corrective measure (FI/CW) study plans, and preliminary risk assessments. Results presented in this report include volatile organic compounds, metals, and anions. The data were generated as part of the routine Columbia River monitoring program currently conducted as part of the SESP.

  13. Clean Water Act (Section 404) and Rivers and Harbors Act (Sections 9 and 10). Environmental Guidance Program Reference Book, Revision 4

    SciTech Connect (OSTI)

    Not Available

    1992-03-01

    This Reference Book contains a current copy of the Clean Water Act (Section 404) and the Rivers and Harbors Act (Sections 9 and 10) and those regulations that implement those sections of the statutes and appear to be most relevant to DOE activities. The document is provided to DOE and contractor staff for informational purposes only and should not be interpreted as legal guidance. Updates that include important new requirements will be provided periodically. Questions concerning this Reference Book may be directed to Mark Petts, IH-231 (FTS 896-2609 or Commercial 202/586-2609).

  14. Subsurface cross section of lower Paleozoic rocks, Powder River basin, Wyoming and Montana

    SciTech Connect (OSTI)

    Macke, D.L.

    1988-07-01

    The Powder River basin is one of the most actively explored Rocky Mountain basins for hydrocarbons, yet the lower Paleozoic (Cambrian through Mississippian) rocks of this interval remain little studied. As a part of a program studying the evolution of sedimentary basins, approximately 3200 km of cross section, based on more than 50 combined geophysical and lithologic logs, have been constructed covering an area of about 200,000 km/sup 2/. The present-day basin is a Cenozoic structural feature located between the stable interior of the North American craton and the Cordilleran orogenic belt. At various times during the early Paleozoic, the basin area was not distinguishable from either the stable craton, the Williston basin, the Central Montana trough, or the Cordilleran miogeocline. Both deposition and preservation in the basin have been greatly influenced by the relative uplift of the Transcontinental arch. Shows of oil and dead oil in well cuttings confirm that hydrocarbons have migrated through at least parts of the basin's lower Paleozoic carbonate section. These rocks may have been conduits for long-distance migration of hydrocarbons as early as Late Cretaceous, based on (1) the probable timing of thermal maturation of hydrocarbon-source rocks within the basin area and to the west, (2) the timing of Laramide structural events, (3) the discontinuous nature of the reservoirs in the overlying, highly productive Pennsylvanian-Permian Minnelusa Formation, and (4) the under-pressuring observed in some Minnelusa oil fields. Vertical migration into the overlying reservoirs could have been through deep fractures within the basin, represented by major lineament systems. Moreover, the lower Paleozoic rocks themselves may also be hydrocarbon reservoirs.

  15. EA-2003: Sandy River Delta Section 536 Ecosystem Restoration Project, Multnomah County, Oregon

    Broader source: Energy.gov [DOE]

    The U.S. Army Corps of Engineers, with DOE’s Bonneville Power Administration as a cooperating agency, prepared an EA that assessed the potential environmental impacts of the proposed removal of a dam from the east channel of the Sandy River. The proposal would help fulfill a portion of the 2010-2013 Federal Columbia River Power System Biological Opinion Implementation Plan to improve estuary habitat for salmon and steelhead species listed under the Endangered Species Act.

  16. Basis for Section 3116 Determination for Salt Waste Disposal at the Savannah River Site

    Broader source: Energy.gov [DOE]

    The Secretary of Energy is making this 3116 Determination pursuant to Section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005 (NDAA) [1]. This 3116...

  17. Rough order of magnitude cost estimate for immobilization of 18.2 MT of plutonium using existing facilities at the Savannah River site: alternatives 3A/5A/6A/6B/7A/9A

    SciTech Connect (OSTI)

    DiSabatino, A., LLNL

    1998-06-01

    The purpose of this Cost Estimate Report is to identify preliminary capital and operating costs for a facility to immobilize 18.2 metric tons (nominal) of plutonium using ceramic in a new facility at Savannah River Site (SRS).

  18. 14655 Section D

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    D Contract No. DE-AC06-05RL14655 A000 PART I - THE SCHEDULE SECTION D PACKAGING AND MARKING TABLE OF CONTENTS D.1 PACKAGING......................................................................................................................................1 D.2 MARKING ..........................................................................................................................................1 D-i River Corridor Closure Contract Section D Contract No. DE-AC06-05RL14655 A000 PART I

  19. 14655 Section J

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    J Contract No. DE-AC06-08RL14655 640 PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS SECTION J LIST OF ATTACHMENTS TABLE OF CONTENTS ATTACHMENT J-1 TABLE OF RIVER CORRIDOR CLOSURE CONTRACT WORK SCOPE ATTACHMENT J-2 DOE DIRECTIVES APPLICABLE TO THE RIVER CORRIDOR CLOSURE CONTRACT ATTACHMENT J-3 PERFORMANCE GUARANTEE AGREEMENTS ATTACHMENT J-4 SMALL BUSINESS SUBCONTRACTING PLAN ATTACHMENT J-5 SMALL DISADVANTAGED BUSINESS PARTICIPATION PROGRAM TARGETS ATTACHMENT J-6 ADVANCE AGREEMENT,

  20. River and Harbors Act

    Broader source: Energy.gov [DOE]

    Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403) prohibits the unauthorized obstruction or alteration of any navigable water of the United States.

  1. Savannah River Site Federal Facility Agreement, January 15, 1993...

    Office of Environmental Management (EM)

    Site Agreement Name Savannah River Site Federal Facility Agreement Under Section 120 of ... with past and present activities at the Savannah River Site are thoroughly investigated ...

  2. 14655 Section I

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    I Contract No. DE-AC06-05RL14655 A099 I-i PART II - CONTRACT CLAUSES SECTION I CONTRACT CLAUSES River Corridor Closure Contract Section I Contract No. DE-AC06-05RL14655 649 I-1 PART II - CONTRACT CLAUSES SECTION I CONTRACT CLAUSES I.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.

  3. SECTION C

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... tons (2,100 metric tons) of spent nuclear fuel, 11.5 tons (10.5 metric tons) of ... and treat Hanford's tank waste and close the Tank Farms to protect the Columbia River. ...

  4. SRS FTF Section 3116 Basis for Determination

    Broader source: Energy.gov [DOE]

    Basis for Section 3116 Determination for Closure of F-Tank Farm at the Savannah River Site. In accordance with NDAA Section 3116, certain waste from reprocessing of spent nuclear fuel is not high...

  5. River Corridor Closure Contract Section J, Attachment...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 Contract No. DE-AC06-05RL14655 A000 1 ATTACHMENT J-12 GOVERNMENT-FURNISHED SERVICES AND INFORMATION (GFSI) GFSI Item Scope Description GFSI Description C.4 Hanford Site...

  6. River Corridor Closure Contract Section J, Attachment...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    use (i.e., use outside the employees regular schedule) of government property (such as computers, telephones, copiers, fax machines or other office equipment) or commercially...

  7. River Corridor Closure Contract Section J, Attachment...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the Government and Washington Closure LLC (Contractor), the undersigned, Washington Group International, Inc. (Guarantor), a corporation incorporated in the State of Delaware with...

  8. Resistivity sections, Upper Arkansas River Basin, Colorado |...

    Open Energy Info (EERE)

    were made to verify a previous gravity survey and to help locate areas where ground-water supplies might be developed. This report presents the results of the surveys in the...

  9. SECTION E

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    E Contract No. DE-AC27-01RV14136 Conformed Thru Modification No. A143 E - i SECTION E INSPECTION AND ACCEPTANCE WTP Contract Section E Contract No. DE-AC27-01RV14136 Conformed Thru...

  10. SECTION H

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations Contract Section H Contract No. DE-AC27-08RV14800 Modification No. 360 H-i PART I - THE SCHEDULE SECTION H SPECIAL CONTRACT REQUIREMENTS TABLE OF CONTENTS H.1 WORKFORCE ...

  11. SECTION G

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    G-1 PART I - THE SCHEDULE SECTION G CONTRACT ADMINISTRATION DATA TABLE OF CONTENTS G.1 CORRESPONDENCE PROCEDURES ......

  12. SECTION J

    Energy Savers [EERE]

    K-1 SECTION J APPENDIX K CONTRACTOR'S TRANSITION PLAN (RESERVED) Contract No.: DE-RW0000005 QA:QA J-K-2

  13. Section 16

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    are compared with measured values determined from vertical time sections of signal-to- noise ratio (proportional to the structure function of the index of refraction, ) from the...

  14. SECTION I

    National Nuclear Security Administration (NNSA)

    to Mod 0108 DE-NA0000622 Section I, Page i PART II - CONTRACT CLAUSES SECTION I CONTRACT CLAUSES TABLE OF CONTENTS I-1 FAR 52.202-1 DEFINITIONS (NOV 2013) (AS MODIFIED BY DEAR 952.202-1) (REPLACED MODS 020, 029, 0084) ................................................................................................................................ 1 I-2 FAR 52.203-3 GRATUITIES (APR 1984) ................................................................................................. 1 I-3 FAR

  15. SECTION H

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations Contract Section H Contract No. DE-AC27-08RV14800 Modification No. 370 H-i PART I - THE SCHEDULE SECTION H SPECIAL CONTRACT REQUIREMENTS TABLE OF CONTENTS H.1 WORKFORCE TRANSITION .......................................................................................................... 1 H.2 EMPLOYEE COMPENSATION: PAY AND BENEFITS ................................................................. 1 H.3 POST-CONTRACT RESPONSIBILITIES FOR PENSION AND OTHER BENEFIT PLANS ........ 19 H.4

  16. CRAD, Engineering - Office of River Protection K Basin Sludge...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Engineering - Office of River Protection K Basin Sludge Waste System CRAD, Engineering - Office of River Protection K Basin Sludge Waste System May 2004 A section of Appendix C to ...

  17. River Data Package for the 2004 Composite Analysis

    SciTech Connect (OSTI)

    Rakowski, Cynthia L.; Guensch, Gregory R.; Patton, Gregory W.

    2004-08-01

    Beginning in fiscal year 2003, the DOE Richland Operations Office initiated activities, including the development of data packages, to support the 2004 Composite Analysis. The river data package provides calculations of flow and transport in the Columbia River system. This document presents the data assembled to run the river module components for the section of the Columbia River from Vernita Bridge to the confluence with the Yakima River.

  18. Section I

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    in Near-symmetric Collisions of 10A MeV Heavy Ions with Solid Targets V. Horvat, . Smit, R. L. Watson and K. Zaharakis Energy Dependence of Electron Loss Cross Sections for...

  19. SECTION F

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 Occupational Medical Services at Hanford F-1 PART I- THE SCHEDULE SECTION F DELIVERIES OR PERFORMANCE TABLE OF CONTENTS F.1 PERIOD OF PERFORMANCE ...........................................................................................................................2 F.2 PRINCIPAL PLACE OF PERFORMANCE .........................................................................................................2 F.3 HOURS OF SERVICE

  20. SECTION J

    Energy Savers [EERE]

    J-1 SECTION J APPENDIX J PERFORMANCE EVALUATION AND MEASUREMENT PLAN (TO BE NEGOTIATED AFTER CONTRACT AWARD) Contract No.: DE-RW0000005 QA:QA J-J-2 Page Blank

  1. Section 66

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 ) (CF 2 Cl 2 ) (CHFCl 2 ) SF 6 CF 4 CCl 4 Session Papers 277 Figure 1. Spectral absorption cross-sections of CF 4 between 1281 and 1284 cm . The experimental -1 conditions...

  2. SECTION J

    Energy Savers [EERE]

    A-1 SECTION J APPENDIX A ADVANCE UNDERSTANDING ON HUMAN RESOURCES (TO BE NEGOTIATED DURING CONTRACT TRANSITION) The personnel appendix required by DEAR Subpart 970.31 entitled "Contract Cost Principles and Procedures" as referenced in Section I Clause, DEAR 970.5232-2, "Payments and Advances" will be Appendix A of the contract. The personnel appendix will be negotiated between DOE OCRWM and the selected offeror during the contract transition period. Contract No.: DE-RW0000005

  3. Section CC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    30 J-12-1 ATTACHMENT J-12 GOVERNMENT FURNISHED SERVICES AND INFORMATION TABLE J-12.1 GFS/I LIST FROM SECTION C (SOW) ID GFS/I GFS/I Due Contract Section GF0001 DOE will administer MOUs with other law enforcement agencies or other Federal agencies (e.g., U.S. Department of Defense [Yakima Training Center]). DOE will provide copies of MOUs and/or contracts to the MSC. As required C.2.1.1.1 GF0002 DOE will provide Federal Commissions for Hanford Patrol personnel. As required C.2.1.1.1 GF0003 DOE

  4. Section CC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract No. DE-AC06-09RL14728 Modification 464 J-11-1 ATTACHMENT J-11 CONTRACT DELIVERABLES TABLE J-11.1 DELIVERABLE LIST FROM SECTION C (SOW) ID Deliverable DOE Contract Deliverable Due Contract Section Action Response Time a CD0001 Hanford Site Services and Interface Requirements Matrix Approve 30 days July 24, 2009; thereafter by request as applicable C.1.3 CD0002 Annual Forecast of Services and Infrastructure Review NA November 21, 2009; annually thereafter by November 31 C.1.3 CD0003

  5. SECTION C

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    C-1 PART 1 - THE SCHEDULE SECTION C DESCRIPTION/SPECIFICATIONS/PERFORMANCE WORK STATEMENT TABLE OF CONTENTS C.1 Hanford Occupational Medical Program .................................................................C-3 C.2 Description of Program Performance Requirements ................................................C-6 C.2.1 Firm Fixed Price Scope...................................................................................C-6 C.2.1.1 Medical Monitoring and Qualification Examinations

  6. SECTION E

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mod 042 Occupational Medical Services at Hanford E-1 PART I - THE SCHEDULE SECTION E INSPECTION AND ACCEPTANCE TABLE OF CONTENTS E.1 INSPECTION..........................................................................................................E-2 E.2 ACCEPTANCE........................................................................................................E-2 E.3 FIXED PRICE CLAUSES.......................................................................................E-2 E.4 COST

  7. SECTION H

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    H Contract No. DE-AC06-08RL14788 Modification 499 PART I - THE SCHEDULE SECTION H SPECIAL CONTRACT REQUIREMENTS TABLE OF CONTENTS H.1 WORKFORCE TRANSITION .......................................................................................................... 1 H.2 EMPLOYEE COMPENSATION: PAY AND BENEFITS ................................................................. 1 H.3 POST-CONTRACT RESPONSIBILITIES FOR PENSION AND OTHER BENEFIT PLANS ........ 14 H.4 NO THIRD PARTY BENEFICIARIES

  8. SECTION H

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    H Contract No: DE-AC06-09RL14728 Modification 491 H-i PART I - THE SCHEDULE SECTION H SPECIAL CONTRACT REQUIREMENTS TABLE OF CONTENTS H.1 WORKFORCE TRANSITION ............................................................................................................ 1 H.2 EMPLOYEE COMPENSATION: PAY AND BENEFITS ................................................................... 1 H.3 POST-CONTRACT RESPONSIBILITIES FOR PENSION AND OTHER BENEFIT PLANS .......... 14 H.4 NO THIRD PARTY

  9. Section J

    Energy Savers [EERE]

    M-1 Section J Appendix M Key Design, Licensing and Site Management M&O Milestone Chart Activity Planned Date Develop and Submit CD-2 (25%-30%) 08/2009 Submission of Construction Performance Specifications - Balance of Plant Support Facilities (OCRWM Start of Construction 3/2012) TBD Submission of Construction Performance Specifications - Initial Handling Facility (IHF) (OCRWM Start of Construction for IHF: 9/2013) TBD Submission of Construction Performance Specifications - Wet Handling

  10. Section Number:

    Energy Savers [EERE]

    QA:QA J-E-1 SECTION J APPENDIX E LIST OF APPLICABLE DIRECTIVES Pursuant to the contract clause entitled, "Laws, Regulations, and DOE Directives," the following list of directives is applicable to this contract. List A Pursuant to the contract clause entitled, "Laws, Regulations, and DOE Directives," the Contractor shall comply with the requirements of applicable Federal, State, and local laws and regulations, unless relief has been granted in writing by the appropriate

  11. SECTION B

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    November 7, 2013 PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) AWARD FEE PLAN (AFP) 1 OCTOBER 2013 THROUGH 30 SEPTEMBER 2014 CONTRACT DE-EM0001971 I. INTRODUCTION This Performance Evaluation and Measurement Plan (PEMP) provides a standard process for development, administration, and coordination of all phases of the fee determination process consistent with Section B.2 of the subject contract. Fee determinations are not subject to the Disputes Clause of the contract. II. ORGANIZATIONAL

  12. SECTION B

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FY16 PEMP 10-22-15 Mod 119 1 PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) ANNUAL FEE PLAN (AFP) 1 OCTOBER 2015 THROUGH 30 SEPTEMBER 2016 CONTRACT DE-EM0001971 October 22, 2015 I. INTRODUCTION This Performance Evaluation and Measurement Plan (PEMP) contains a standard process for development, administration, and coordination of all phases of the fee determination process consistent with Section B.2 of the subject contract. II. ORGANIZATIONAL STRUCTURE AND DUTIES The following organizational

  13. SECTION J

    Energy Savers [EERE]

    D-1 SECTION J APPENDIX D KEY PERSONNEL Name Position Doug Cooper General Manager John Donnell Repository Licensing Lead Al Ebner, PE, PhD Repository Design Lead Steve Piccolo Deputy General Manager Steve White Quality & Performance Assurance Lead George Clare Project Management & Integration Lead Mike Hitchler Preclosure Safety Analysis Lead Contract No.: DE-RW0000005 QA:QA J-D-2 POSITION DESCRIPTIONS OCRWM SPECIFIED KEY PERSONNEL 1. General Manager: Requires 10 years experience as a

  14. SECTION J

    Energy Savers [EERE]

    J-F-1 SECTION J APPENDIX F CRITICAL STAFF Subject Matter Expert Subject Matter Canister Transfer Machine Engineering Waste Package Transfer Trolley Engineering Transport and Emplacement Vehicle Engineering Cask Transfer Trolley Engineering Criticality and Nuclear Engineering Subsurface Thermal Management Engineering Pre-closure Safety Analysis Specialist Waste Package and Drip Shields Engineering Waste Package Closure System Engineering NOG-1 Cranes Engineering Subsurface Design Engineering

  15. SECTION J

    Energy Savers [EERE]

    H-1 SECTION J APPENDIX H CONTRACT GUIDANCE FOR PREPARATION OF DIVERSITY PLAN This Guidance is to assist the Contractor in understanding the information being sought by the Department for each of the Diversity elements and where these issues may already be addressed in the contract. To the extent these issues are already addressed in the contract, the Contractor need only cross reference the location. Contractor's Workforce The Department's contracts contain clauses on Equal Employment

  16. Section L

    National Nuclear Security Administration (NNSA)

    Section L - Attachment F - Past Performance Cover Letter and Questionnaire Date: ________________ Dear _________________: Our firm is submitting a proposal for a Department of Energy (DOE)/National Nuclear Security Administration (NNSA) Contract for the management and operation of the Nevada National Security Site with an estimated value of approximately $550M per year. Our firm is seeking your assistance. We are asking you to complete the attached questionnaire evaluating our performance on

  17. Section J

    Energy Savers [EERE]

    L-1 Section J Appendix L MEMORANDUM FROM DAVID R. HILL, GENERAL COUNSEL, DATED NOVEMBER 30, 2006, SUBJECT: ONGOING LICENSING SUPPORT NETWORK ("LSN") OBLIGATIONS Contract No.: DE-RW0000005 QA:QA J-L-2 Contract No.: DE-RW0000005 QA:QA J-L-3 Contract No.: DE-RW0000005 QA:QA J-L-4 Contract No.: DE-RW0000005 QA:QA J-L-5 Contract No.: DE-RW0000005 QA:QA J-L-6 Contract No.: DE-RW0000005 QA:QA J-L-7 Contract No.: DE-RW0000005 QA:QA J-L-8 Contract No.: DE-RW0000005 QA:QA J-L-9 Contract No.:

  18. OFFICE OF RIVER PROTECTION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1-6-60 Richland, Washington 99352 SEP 3 0 2013 13 -CPM-0262 Mr. Charles A. Simpson, Contracts Manager Washington River Protection Solutions LLC 2440 Stevens Center Place Richland, Washington 99354 Mr. Simpson: CONTRACT NO. DE-AC27-08RVI4800 - TRANSMITTAL OF CONTRACT MODIFICATION 231 The purpose of this letter is to transmit the fully-executed Contract Modification 23 1. This modification revises the contract price for the base contract period and updates Section J, Attachment J.4, Performance

  19. Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Assessment of Radionuclide Monitoring in the CSRA Savannah River NERP Research ... Upcoming Seminars The Savannah River Ecology Laboratory is a research unit of the ...

  20. SULFATE SOLUBILITY LIMIT VERIFICATION FOR DWPF SLUDGE BATCH 7A

    SciTech Connect (OSTI)

    Billings, A.

    2011-04-19

    During processing at the Defense Waste Processing Facility (DWPF), high sulfate concentrations in the feed are a concern to DWPF as it can lead to the formation of a detrimental, sulfate-rich, molten salt phase on the surface of the glass melt pool. To avoid these issues, a sulfate concentration limit was implemented into the Product Composition Control System (PCCS). Related to SB7a frit development efforts, the Savannah River National Laboratory (SRNL) assessed the viability of using the current 0.6 wt % SO{sub 4}{sup 2-} limit set for SB6 (in glass) and the possibility of increasing the SO{sub 4}{sup 2-} solubility limit in PCCS to account for anticipated sulfur concentrations, targeted waste loadings, and inclusion of secondary streams (e.g., Actinide Removal Process (ARP)) with two recommended frits (Frit 418 and Frit 702) for SB7a processing. For a nominal SB7a blend with a 63 inch SB6 heel remaining in Tank 40 (projection SB7a-63), a 0.60 wt% SO{sub 4}{sup 2-} in glass limit was determined for waste loadings of 34 wt% up to 40 wt% with Frit 418 based on crucible melts with batched chemicals. SRNL also examined the inclusion of ARP for the same blending scenario (SB7a-63-ARP) with Frit 418 and at least a 0.6 wt% SO{sub 4}{sup 2-} level, and waste loadings of 34 wt% to 40 wt% were also acceptable. When a visible yellow and/or white sulfate salt layer was visible on the surface of any cooled glass, it was assumed to have surpassed the solubility limit of SO{sub 4}{sup 2-} for that particular composition. All of the glasses fabricated at these concentrations did not exhibit a sulfate rich salt layer on the surface of the glass melt and retained the majority of the batched SO{sub 4}{sup 2-}. At higher levels of SO{sub 4}{sup 2-} 'spiked' into the projected sludge compositions over the aforementioned interval of waste loadings, with Frit 418, low viscosity sulfur layers were observed on the surface of glass melts which confirm exceeding the solubility limit. The same sludge scenarios were also tested with Frit 702 and all glasses did not exhibit sulfur layers on the surfaces of the glass melts at spiking levels up to 0.80 wt% SO{sub 4}{sup 2-}. An ultimate SO{sub 4}{sup 2-} limit was not defined with Frit 702, but if projected SO{sub 4}{sup 2-} concentrations are expected to increase with the onset of SB7a processing, a higher limit is achievable with Frit 702 than is achievable with Frit 418. Given the anticipated concentration of SO{sub 4}{sup 2-} for SB7a, a SO{sub 4}{sup 2-} limit of 0.6 wt % SO{sub 4}{sup 2-} is recommended for processing using Frit 418. Once the confirmed SB7a composition is known and should a higher limit be needed, SRNL can re-evaluate the limit based on the actual composition and provide an updated recommendation. It has been observed that higher levels of SO{sub 4}{sup 2-} in glass can be retained with compositional changes to the frit, as was demonstrated by the glasses fabricated using Frit 702. SRNL also recommends the continuation of studies to define a more 'global' sulfate concentration limit to account for future sludge batch composition uncertainties.

  1. REPORTABLE RADIONUCLIDES IN DWPF SLUDGE BATCH 7A (MACROBATCH 8)

    SciTech Connect (OSTI)

    Reboul, S.; Diprete, D.; Click, D.; Bannochie, C.

    2011-12-20

    The Waste Acceptance Product Specifications (WAPS) 1.2 require that the waste producer 'shall report the curie inventory of radionuclides that have half-lives longer than 10 years and that are, or will be, present in concentrations greater than 0.05 percent of the total inventory for each waste type indexed to the years 2015 and 3115.' As part of the strategy to meet WAPS 1.2, the Defense Waste Processing Facility (DWPF) will report for each waste type all radionuclides that have half-lives longer than 10 years and contribute greater than 0.01 percent of the total curie inventory from the time of production through the 1100 year period from 2015 through 3115. The initial list of radionuclides to be reported is based on the design-basis glass identified in the Waste Form Compliance Plan (WCP) and Waste Form Qualification Report. However, it is required that the list be expanded if other radionuclides with half-lives greater than 10 years are identified that meet the 'greater than 0.01% of the curie inventory' criterion. Specification 1.6 of the WAPS, International Atomic Energy Agency Safeguards Reporting for High Level Waste (HLW), requires that the ratio by weights of the following uranium and plutonium isotopes be reported: U-233, U-234, U-235, U-236, and U-238; and Pu-238, Pu-239, Pu-240, Pu-241, and Pu-242. Therefore, the complete list of reportable radionuclides must also include these sets of U and Pu isotopes - and the U and Pu isotopic mass distributions must be identified. The DWPF receives HLW sludge slurry from Savannah River Site (SRS) Tank 40. For Sludge Batch 7a (SB7a), the waste in Tank 40 contained a blend of the heel from Sludge Batch 6 (SB6) and the Sludge Batch 7 (SB7) material transferred to Tank 40 from Tank 51. This sludge blend is also referred to as Macrobatch 8. Laboratory analyses of a Tank 40 sludge sample were performed to quantify the concentrations of pertinent radionuclides in the SB7a waste. Subsequently, radiological decay and in-growth were calculated over the time period from 2015 to 3115. This provided a basis for characterizing the radionuclide content of SB7a over time and for identifying the 'reportable radionuclides.' Details of the characterization methodology and the analytical results are the focus of this report. This work was performed at the request of the Waste Solidification Engineering Department of Savannah River Remediation, initiated via Technical Task Request (TTR) HLW-DWPF-TTR-2010-0031. A minor revision in the reporting requirements was requested via a subsequent email communication. The work was conducted in accordance with the protocols identified in Task Technical and Quality Assurance Plan SRNL-RP-2010-01218 and Analytical Study Plan SRNL-RP-2010-01219. All of the raw data related to this scope have been recorded in laboratory notebook SRNL-NB-2011-00061. The overall goal of this task was to characterize the radionuclide content of the SB7a waste sufficiently to meet the WAPS and DWPF reporting requirements. The specific objectives were: (1) Quantify the current concentrations of all radionuclides impacting (or potentially-impacting) the total curie content between calendar years 2011 and 3115. Also quantify the current concentrations of other radionuclides specifically requested in the TTR or required by the WAPS. (2) Calculate future concentrations of decayed and in-grown radionuclides impacting the total curie content between calendar years 2015 and 3115; (3) Identify as 'reportable' all radionuclides contributing {ge} 0.01% of the total curie content from 2015 to 3115 and having half-lives {ge} 10 years.

  2. DOT-7A packaging test procedure

    SciTech Connect (OSTI)

    Kelly, D.L.

    1995-01-23

    This test procedure documents the steps involved with performance testing of Department of Transportation Specification 7A (DOT-7A) Type A packages. It includes description of the performance tests, the personnel involved, appropriate safety considerations, and the procedures to be followed while performing the tests. Westinghouse Hanford Company (WHC) is conducting the evaluation and testing discussed herein for the Department of Energy-Headquarters, Division of Quality Verification and Transportation Safety (EH-321). Please note that this report is not in WHC format. This report is being submitted through the Engineering Documentation System so that it may be used for reference and information purposes.

  3. Columbia River monitoring: Distribution of tritium in Columbia River water at the Richland Pumphouse

    SciTech Connect (OSTI)

    Dirkes, R.L.

    1993-02-01

    The Surface Environmental Surveillance Project (SESP) is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This report presents the results of a special study conducted as part of the SESP to supplement the routine Columbia River monitoring program and provide information relative to the dispersion and distribution of Hanford origin contaminants entering the river through the seepage of ground water along the Hanford Site. Sampling was conducted along cross sections to determine the distribution of tritium within the Columbia River at Richland, Washington. The investigation was also designed to evaluate the relationship between the average tritium concentrations in the river water at this location and in water collected from the routine SESP river monitoring system located at the city of Richland drinking water intake (Richland Pumphouse). This study was conducted during the summers of 1987 and 1988. Water samples were collected along cross sections located at or near the Richland Pumphouse monitoring station.

  4. Analysis Of DWPF Sludge Batch 7a (Macrobatch 8) Pour Stream Samples

    SciTech Connect (OSTI)

    Johnson, F. C.; Pareizs, J. M.

    2012-10-24

    The Defense Waste Processing Facility (DWPF) began processing Sludge Batch 7a (SB7a), also referred to as Macrobatch 8 (MB8), in June 2011. SB7a is a blend of the heel of Tank 40 from Sludge Batch 6 (SB6) and the SB7a material that was transferred to Tank 40 from Tank 51. SB7a was processed using Frit 418. During processing of each sludge batch, the DWPF is required to take at least one glass sample to meet the objectives of the Glass Product Control Program (GPCP), which is governed by the DWPF Waste Compliance Plan, and to complete the necessary Production Records so that the final glass product may be disposed of at a Federal Repository. Three pour stream glass samples and two Melter Feed Tank (MFT) slurry samples were collected while processing SB7a. These additional samples were taken during SB7a to understand the impact of antifoam and the melter bubblers on glass redox chemistry. The samples were transferred to the Savannah River National Laboratory (SRNL) where they were analyzed.

  5. ANALYSIS OF DWPF SLUDGE BATCH 7A (MACROBATCH 8) POUR STREAM SAMPLES

    SciTech Connect (OSTI)

    Johnson, F.

    2012-05-01

    The Defense Waste Processing Facility (DWPF) began processing Sludge Batch 7a (SB7a), also referred to as Macrobatch 8 (MB8), in June 2011. SB7a is a blend of the heel of Tank 40 from Sludge Batch 6 (SB6) and the SB7a material that was transferred to Tank 40 from Tank 51. SB7a was processed using Frit 418. During processing of each sludge batch, the DWPF is required to take at least one glass sample to meet the objectives of the Glass Product Control Program (GPCP), which is governed by the DWPF Waste Compliance Plan, and to complete the necessary Production Records so that the final glass product may be disposed of at a Federal Repository. Three pour stream glass samples and two Melter Feed Tank (MFT) slurry samples were collected while processing SB7a. These additional samples were taken during SB7a to understand the impact of antifoam and the melter bubblers on glass redox chemistry. The samples were transferred to the Savannah River National Laboratory (SRNL) where they were analyzed. The following conclusions were drawn from the analytical results provided in this report: (1) The sum of oxides for the official SB7a pour stream glass is within the Product Composition Control System (PCCS) limits (95-105 wt%). (2) The average calculated Waste Dilution Factor (WDF) for SB7a is 2.3. In general, the measured radionuclide content of the official SB7a pour stream glass is in good agreement with the calculated values from the Tank 40 dried sludge results from the SB7a Waste Acceptance Program Specification (WAPS) sample. (3) As in previous pour stream samples, ruthenium and rhodium inclusions were detected by Scanning Electron Microscopy-Electron Dispersive Spectroscopy (SEM-EDS) in the official SB7a pour stream sample. (4) The Product Consistency Test (PCT) results indicate that the official SB7a pour stream glass meets the waste acceptance criteria for durability with a normalized boron release of 0.64 g/L, which is an order of magnitude less than the Environmental Assessment (EA) glass. (5) The measured density of the SB7a pour stream glass was 2.7 g/cm{sup 3}. (6) The Fe{sup 2+}/{Sigma}Fe ratios of the SB7a pour stream samples were in the range of 0.04-0.13, while the MFT sample glasses prepared by SRNL were in the range of 0.02-0.04.

  6. Supplement Number 3 to the Operating Plan of Mirant Potomac River...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 to the Operating Plan of Mirant Potomac River, LLC Supplement Number 3 to the Operating Plan of Mirant Potomac River, LLC Docket No. EO-05-01:Pursuant to Section 202(c) of the ...

  7. Title 36 CFR 297 Wild and Scenic Rivers | Open Energy Information

    Open Energy Info (EERE)

    Abstract Section 7 of the Wild and Scenic Rivers Act provides for the protection of the free-flowing, scenic, and natural values of rivers designated as components or potential...

  8. Title 36 C.F.R. 297 Wild and Scenic Rivers | Open Energy Information

    Open Energy Info (EERE)

    Abstract Section 7 of the Wild and Scenic Rivers Act provides for the protection of the free-flowing, scenic, and natural values of rivers designated as components or potential...

  9. Evaluate Status of Pacific Lamprey in the Clearwater River and Salmon River Drainages, Idaho, 2009 Technical Report.

    SciTech Connect (OSTI)

    Cochnauer, Tim; Claire, Christopher

    2009-05-07

    Pacific lamprey Lampetra tridentata have received little attention in fishery science until recently, even though abundance has declined significantly along with other anadromous fish species in Idaho. Pacific lamprey in Idaho have to navigate over eight lower Snake River and Columbia River hydroelectric facilities for migration downstream as juveniles to the Pacific Ocean and again as adults migrating upstream to their freshwater spawning grounds in Idaho. The number of adult Pacific lamprey annually entering the Snake River basin at Ice Harbor Dam has declined from an average of over 18,000 during 1962-1969 to fewer than 600 during 1998-2006. Based on potential accessible streams and adult escapement over Lower Granite Dam on the lower Snake River, we estimate that no more than 200 Pacific lamprey adult spawners annually utilize the Clearwater River drainage in Idaho for spawning. We utilized electrofishing in 2000-2006 to capture, enumerate, and obtain biological information regarding rearing Pacific lamprey ammocoetes and macropthalmia to determine the distribution and status of the species in the Clearwater River drainage, Idaho. Present distribution in the Clearwater River drainage is limited to the lower sections of the Lochsa and Selway rivers, the Middle Fork Clearwater River, the mainstem Clearwater River, the South Fork Clearwater River, and the lower 7.5 km of the Red River. In 2006, younger age classes were absent from the Red River.

  10. Federal Power Act section 202(c) - Mirant Corporation, August 2005 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Federal Power Act section 202(c) - Mirant Corporation, August 2005 Federal Power Act section 202(c) - Mirant Corporation, August 2005 On August 24, 2005 in response to a decision by Mirant Corporation to cease generation of electricity at its Potomac River generating station, the District of Columbia Public Service Commission requested that the Secretary of Energy issue a 202(c) emergency order requiring the operation of the Potomac River generating station in order to

  11. Savannah River Field Office | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Savannah River Field Office

  12. CRAD, Emergency Management - Office of River Protection K Basin Sludge

    Energy Savers [EERE]

    Waste System | Department of Energy Emergency Management - Office of River Protection K Basin Sludge Waste System CRAD, Emergency Management - Office of River Protection K Basin Sludge Waste System May 2004 A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a May 2004 assessment of the Emergency Management program at the Office of River

  13. Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    in 1997 and replaced with two other areas, both located in the Savannah River swamp. ... on the natural levy that parallels the Savannah River. Area: 1 2 3 4 5 6 7 8 9 10 11 ...

  14. River Corridor Achievements

    Broader source: Energy.gov [DOE]

    Washington Closure Hanford and previous contractors have completed much of the cleanup work in the River Corridor, shown here.

  15. section-a.xls

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Item 7) U.S. Department of Energy Office of River Protection Same as Block 7 Office of Business Management and Administration, H6-60 ATTN: Michael K. Barrett, Contracting...

  16. River Corridor Closure Contract Section J, Attachment J-15

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    by DOE-RL on 111010 (Reference 11-OOD- 0007) Yes DOE-0342, Rev. 0 Hanford Site Chronic Beryllium Disease Prevention Program (CBDPP) (as required by 10 CFR 850) Approved by...

  17. River Corridor Closure Contract Section J, Attachment J-13

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 Contract No. DE-AC06-08RL14655 A000 1 ATTACHMENT J-13 HANFORD SITE SERVICES Hanford Site Services are divided into three categories: Category 1: DOE will provide these Mandatory...

  18. River Corridor Closure Contract Section J, Attachment J-14

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cost of Work Performed BCWS Budgeted Cost of Work Scheduled BHI Bechtel Hanford, Inc. BMS Business Management System BRC Budget and Reporting Classification CAS Cost Accounting...

  19. River Corridor Closure Contract Section J, Attachment J-2 Contract...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... the Office of Inspector General CRD O 225.1A (Supplemented Rev. 0) Accident Investigations CRD O 226.1B Implementation of Department of Energy Oversight Policy CRD O 227.1 (Supp. ...

  20. River Corridor Closure Contract Section J, Attachment J-6

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 Contract No. DE-AC06-05RL14655 Mod 459 1 ATTACHMENT J-6 ADVANCE AGREEMENT, PERSONNEL, AND RELATED COSTS This attachment will be prepared subsequent to Contract award pursuant to Clause H.15, Advance Understanding on Costs. The advance understandings listed below are subject to the specific limitations, conditions, and exclusions of subpart 31.2 of FAR as supplemented by Department of Energy Acquisition Regulation (DEAR) 931.2. TYPE OF COST ALLOWABILITY CLARIFICATION Beryllium Testing/Travel

  1. CRAD, Emergency Management - Office of River Protection K Basin...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CRAD, Emergency Management - Office of River Protection K Basin Sludge Waste System May 2004 A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of ...

  2. Savannah River Technology Center. Monthly report

    SciTech Connect (OSTI)

    Not Available

    1993-01-01

    This is a monthly progress report from the Savannah River Laboratory for the month of January 1993. It has sections with work in the areas of reactor safety, tritium processes and absorption, separations programs and wastes, environmental concerns and responses, waste management practices, and general concerns.

  3. Lower Colorado River Authority | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Lower Colorado River Authority's communications requirements

  4. Office of River Protection - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Office of River Protection Office of River Protection Office of River Protection Office of River Protection Email Email Page | Print Print Page |Text Increase Font Size Decrease...

  5. THE SLUDGE BATCH 7A GLASS VARIABILITY STUDY WITH FRIT 418 AND FRIT 702

    SciTech Connect (OSTI)

    Peeler, D.; Edwards, T.

    2011-03-24

    The Defense Waste Processing Facility (DWPF) is preparing to initiate processing of Sludge Batch 7a (SB7a) in May 2011. To support qualification of SB7a, the Savannah River National Laboratory (SRNL) was requested to execute a variability study (VS) to assess the applicability of the current Product Composition Control System (PCCS) durability models for the Frit 418-SB7a compositional region of interest. The objective of this study was to demonstrate applicability of the current durability models to the SB7a compositional region of interest and acceptability of the SB7a glasses with respect to the Environmental Assessment (EA) glass in terms of durability as defined by the Product Consistency Test (PCT). To support programmatic objectives, twenty-eight SB7a glasses were selected based on the nominal sludge projections used to support the frit recommendation. Twenty-three of the SB7a VS glasses were based on the use of Frit 418, while 5 glasses were based on the use of Frit 702. Frit 702 was also identified as a viable candidate for SB7a, especially if SO{sub 4} concentrations are found to be higher than anticipated. Frit 702 has shown a higher SO{sub 4} retention capability as compared to Frit 418. With respect to acceptability, the PCT results of the SB7a-VS glasses are acceptable relative to the EA glass regardless of thermal history (quenched or canister centerline cooled) or compositional view (target or measured). More specifically, all of the SB7a glasses have normalized boron release values (NL [B]) less than 0.9 g/L as compared to the benchmark NL [B] value for EA of 16.695 g/L. With respect to the applicability of the current durability models to the SB7a VS compositional region of interest, all of the study glasses (based on target compositions) lie within the 95% confidence intervals of the model predictions. When model applicability is based on the measured compositions, all of the SB7a VS glasses are predictable with the exception of SB7aVS-02 and SB7aVS-06. Although the NL [B] values of these two glasses range from 0.66 to 0.73 g/L (considered very acceptable), the PCT responses are not considered predictable by the current durability models. The current durability models are conservative for these glasses since they are more durable than predicted by the models. These two glasses are extreme vertices (EV) based compositions coupled with Frit 418 at 36% WL and target the maximum Na{sub 2}O content (15.01 wt% Na{sub 2}O) of the SB7a VS glasses. Higher alkali glasses for which the model overpredicts the PCT response have been observed previously in the Sludge Batch 3 (SB3) Phase 1 VS and the Sludge Batch 6 (SB6) VS.

  6. Savannah River National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Savannah River National Laboratory srnl.doe.gov SRNL is a DOE National Laboratory operated by Savannah River Nuclear Solutions. At a glance 'Tin whiskers' suppression method Researchers at the Savannah River National Laboratory (SRNL) have identified a treatment method that slows or prevents the formation of whiskers in lead-free solder. Tin whiskers spontaneously grow from thin films of tin, often found in microelectronic devices in the form of solders and platings. Background This problem was

  7. River and Plateau Committee

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of Energy River Turbine Provides Clean Energy to Remote Alaskan Village River Turbine Provides Clean Energy to Remote Alaskan Village August 18, 2015 - 10:36am Addthis River Turbine Provides Clean Energy to Remote Alaskan Village Alison LaBonte Marine and Hydrokinetic Technology Manager To date, Ocean Renewable Power Company (ORPC) is the only company to have built, operated and delivered power to a utility grid from a hydrokinetic tidal project, and to a local microgrid from a hydrokinetic

  8. RFP Section H and Section L Templates

    Broader source: Energy.gov [DOE]

    On April 26, 2011, two draft RFP Section H templates "Performance Requirements" and "Performance Evaluation and Measurement Plan" and one draft RFP Section L template "Proposal Preparation Instructions – Cover Letter and Volume I, Offer and Other Documents" were distributed for Procurement Director (PD), Head of Contracting Activity (HCA), General Counsel and National Nuclear Security Administration (NNSA) review and comment. All comments received were considered and changes were made as appropriate. The final version of the three aforementioned RFP Section H and L templates are available in STRIPES.

  9. Great River (1973)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Volume One Film Collection Volume Two 75th Anniversary Hydropower in the Northwest Woody Guthrie Videos Strategic Direction Branding & Logos Power of the River History Book...

  10. River of Power (1987)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Volume One Film Collection Volume Two 75th Anniversary Hydropower in the Northwest Woody Guthrie Videos Strategic Direction Branding & Logos Power of the River History Book...

  11. Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of bottomland hardwoodfloodplain forest communities of a southern river swamp system. ... or urban waste discharge, or power plant cooling effluents. Area: 1 2 3 4 5 6 7 ...

  12. Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    location of the Savannah River Ecology Laboratory, is one of the original ten SREL habitat reserves and was selected to complement the old-field habitatplant succession studies ...

  13. SECTION L… ATTACHMENT H

    National Nuclear Security Administration (NNSA)

    III-SECTION J APPENDIX K TRANSITION PLAN To be Added at a Later Date

  14. VERIFICATION OF THE DEFENSE WASTE PROCESSING FACILITY'S (DWPF) PROCESS DIGESTION METHOD FOR THE SLUDGE BATCH 7A QUALIFICATION SAMPLE

    SciTech Connect (OSTI)

    Click, D.; Edwards, T.; Jones, M.; Wiedenman, B.

    2011-03-14

    For each sludge batch that is processed in the Defense Waste Processing Facility (DWPF), the Savannah River National Laboratory (SRNL) performs confirmation of the applicability of the digestion method to be used by the DWPF lab for elemental analysis of Sludge Receipt and Adjustment Tank (SRAT) receipt samples and SRAT product process control samples. DWPF SRAT samples are typically dissolved using a room temperature HF-HNO{sub 3} acid dissolution (i.e., DWPF Cold Chem Method, see DWPF Procedure SW4-15.201) and then analyzed by inductively coupled plasma - atomic emission spectroscopy (ICP-AES). This report contains the results and comparison of data generated from performing the Aqua Regia (AR), Sodium peroxide/Hydroxide Fusion (PF) and DWPF Cold Chem (CC) method digestions of Sludge Batch 7a (SB7a) SRAT Receipt and SB7a SRAT Product samples. The SB7a SRAT Receipt and SB7a SRAT Product samples were prepared in the SRNL Shielded Cells, and the SRAT Receipt material is representative of the sludge that constituates the SB7a Batch or qualification composition. This is the sludge in Tank 51 that is to be transferred into Tank 40, which will contain the heel of Sludge Batch 6 (SB6), to form the Sb7a Blend composition.

  15. about Savannah River National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The EDM capability at the Savannah River National Laboratory (SRNL) is unique to the Savannah River Site. It allows for very fine, precise cutting of metal without destroying ...

  16. PART III - SECTION J

    National Nuclear Security Administration (NNSA)

    E SECTION J APPENDIX E PERFORMANCE GUARANTEE AGREEMENT(S) [Note: To be inserted by the Contracting Officer prior to contract award. For Performance Guarantee Agreement(s) template, see Section L, Attachment A.]

  17. Section D - G

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SECTION D PACKAGING AND MARKING Request for Proposal DE-RFP 36-07GO97036 PART I SECTION D PACKAGING AND MARKING TABLE OF CONTENTS D.1 Packaging......

  18. PART III - SECTION J

    National Nuclear Security Administration (NNSA)

    I SECTION J APPENDIX I SMALL BUSINESS SUBCONTRACTING PLAN Note: To be inserted by the Contracting Officer prior to...

  19. PART III - SECTION J

    National Nuclear Security Administration (NNSA)

    I SECTION J APPENDIX I SMALL BUSINESS SUBCONTRACTING PLAN [Note: To be inserted by the Contracting Officer prior to

  20. Office of River Protection (ORP) and Washingotn River Protection Solutions,

    Energy Savers [EERE]

    LLC (WRPS) Partnering Agreement for the DOE-EM Tank Operations Project | Department of Energy River Protection (ORP) and Washingotn River Protection Solutions, LLC (WRPS) Partnering Agreement for the DOE-EM Tank Operations Project Office of River Protection (ORP) and Washingotn River Protection Solutions, LLC (WRPS) Partnering Agreement for the DOE-EM Tank Operations Project The Mission of the Office of River Protection is to safely retrieve and treat Hanford's tank waste and close the Tank

  1. Savannah river site

    National Nuclear Security Administration (NNSA)

    at the Savannah River Site (SRS) to supply and process tritium, a radioactive form of hydrogen that is a vital component of nuclear weapons. SRS loads tritium and non-tritium...

  2. The Savannah River Site's Groundwater Monitoring Program

    SciTech Connect (OSTI)

    Not Available

    1989-01-01

    The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site's Groundwater Monitoring Program. During fourth quarter 1989 (October--December), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. An explanation of flagging criteria for the fourth quarter is presented in the Flagging Criteria section of this document. All analytical results from fourth quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

  3. PART III ? SECTION J

    National Nuclear Security Administration (NNSA)

    B, Page 1 SECTION J APPENDIX B AWARD FEE PLAN Note: To be inserted by the Contracting Officer after contract award....

  4. PART III ? SECTION J

    National Nuclear Security Administration (NNSA)

    M, Page 1 SECTION J APPENDIX M CONTRACTOR COMMITMENTS, AGREEMENTS, AND UNDERSTANDINGS Note: To be inserted by the Contracting Officer after contract award....

  5. 14655 Section D

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    D Contract No. DE-AC06-05RL14655 A000 PART I - THE SCHEDULE SECTION D PACKAGING AND MARKING TABLE OF CONTENTS D.1 PACKAGING......

  6. PART III - SECTION J

    National Nuclear Security Administration (NNSA)

    L, Page 1 SECTION J APPENDIX L SPECIAL FINANCIAL INSTITUTION AGREEMENT FOR USE WITH THE ... and ... the Financial Institution a financial institution ...

  7. Section 106 Archaeology Guidance

    Broader source: Energy.gov [DOE]

    The Advisory Council on Historic Preservation's Section 106 guidance is designed to assist federal agencies in making effective management decisions about archaeological resources in completing the requirements of Section 106 of the National Historic Preservation Act (16 U.S.C. 470f) and its implementing regulations (36 CFR Part 800). This guidance highlights the decision-making role of the federal agency in the Section 106 process. It is also designed for use by State and Tribal Historic Preservation Officers, Indian tribes, Native Hawaiian organizations, and cultural resource management professionals when assisting federal agencies to meet their responsibilities under Section 106.

  8. Savannah River Site Salt Waste Processing Facility Technology Readiness

    Energy Savers [EERE]

    Assessment Report | Department of Energy Salt Waste Processing Facility Technology Readiness Assessment Report Savannah River Site Salt Waste Processing Facility Technology Readiness Assessment Report Full Document and Summary Versions are available for download PDF icon Savannah River Site Salt Waste Processing Facility Technology Readiness Assessment Report PDF icon Summary - SRS Salt Waste Processing Facility More Documents & Publications Compilation of TRA Summaries Basis for Section

  9. 14655 Section H

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Section H Contract No. DE-AC06-05RL14655 H-i PART I - THE SCHEDULE SECTION H SPECIAL CONTRACT REQUIREMENTS TABLE OF CONTENTS H.1 INCUMBENT EMPLOYEES HIRING PREFERENCES ................................................................... 1 H.2 PAY AND BENEFITS ....................................................................................................................... 1 H.3 LABOR RELATIONS

  10. Sectional device handling tool

    DOE Patents [OSTI]

    Candee, Clark B.

    1988-07-12

    Apparatus for remotely handling a device in an irradiated underwater environment includes a plurality of tubular sections interconnected end-to-end to form a handling structure, the bottom section being adapted for connection to the device. A support section is connected to the top tubular section and is adapted to be suspended from an overhead crane. Each section is flanged at its opposite ends. Axially retractable bolts in each bottom flange are threadedly engageable with holes in the top flange of an adjacent section, each bolt being biased to its retracted position and retained in place on the bottom flange. Guide pins on each top flange cooperate with mating holes on adjacent bottom flanges to guide movement of the parts to the proper interconnection orientation. Each section carries two hydraulic line segments provided with quick-connect/disconnect fittings at their opposite ends for connection to the segments of adjacent tubular sections upon interconnection thereof to form control lines which are connectable to the device and to an associated control console.

  11. Sioux River Ethanol LLC | Open Energy Information

    Open Energy Info (EERE)

    River Ethanol LLC Jump to: navigation, search Name: Sioux River Ethanol LLC Place: Hudson, South Dakota Zip: 57034 Product: Farmer owned ethanol producer, Sioux River Ethanol is...

  12. Savannah River Site | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Savannah River Site FY 2015 FY 2015 Performance Evaluation Plan, Savannah River Nuclear Solitions, LLC FY 2014 FY 2014 Performance Evaluation Report, Savannah River Nuclear ...

  13. Raft River Geothermal Facility | Open Energy Information

    Open Energy Info (EERE)

    Facility Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Raft River Geothermal Facility General Information Name Raft River Geothermal Facility Facility Raft River...

  14. Sky River Wind Farm | Open Energy Information

    Open Energy Info (EERE)

    River Wind Farm Jump to: navigation, search Name Sky River Wind Farm Facility Sky River Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner...

  15. Wing River Wind Farm | Open Energy Information

    Open Energy Info (EERE)

    to: navigation, search Name Wing River Wind Farm Facility Wing River Wind Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Wing River...

  16. Flambeau River Biofuels | Open Energy Information

    Open Energy Info (EERE)

    Flambeau River Biofuels Jump to: navigation, search Name: Flambeau River Biofuels Place: Park Falls, Wisconsin Sector: Biomass Product: A subsidiary of Flambeau River Papers LLC...

  17. Savannah River Site Waste Disposition Project

    Office of Environmental Management (EM)

    Terrel J. Spears Assistant Manager Waste Disposition Project DOE Savannah River Operations Office Savannah River Site Savannah River Site Waste Disposition Project Waste ...

  18. Savannah River | Department of Energy

    Energy Savers [EERE]

    River Savannah River Following are compliance agreements for the Savannah River Site. Also included are short summaries of the agreements. PDF icon Natural Resources Defense Council Consent Decree, May 26, 1988 PDF icon Natural Resources Defense Council Consent Decree, May 26, 1988 Summary PDF icon Savannah River Site Consent Order 99-155-W, October 11, 1999 PDF icon Savannah River Site Consent Order 99-155-W, October 11, 1999 Summary PDF icon Savannah River Site Consent Order 85-70-SW, November

  19. Neutrino Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    MiniBooNE (MB) is a e search (B. Fleming, next session) - High rates and good particle ID also allow accurate cross section measurements. - Important for MB and...

  20. 14655 Section J

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6, Mod 332 J.6-1 ATTACHMENT J.6 SMALL BUSINESS SUBCONTRACTING PLAN Plateau Remediation Contract Section J Contract No. DE-AC06-08RL14788 Attachment J.6, Mod 332 J.6-2 SMALL...

  1. PART III - SECTION J

    National Nuclear Security Administration (NNSA)

    E SECTION J APPENDIX E PERFORMANCE GUARANTEE AGREEMENT(S) Note: To be inserted by the Contracting Officer prior to contract award. For Performance Guarantee Agreement(s) template,...

  2. 14655 Section J

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0, Revision 4 ATTACHMENT J.10 WAGE DETERMINATIONS - SERVICE CONTRACT ACT (SCA) AND DAVIS-BACON ACT J.10-1 Plateau Remediation Contract Section J Contract No. DE-AC06-08RL14788...

  3. Section I - Contract Clauses

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and protections under 41 U.S.C. 4712, as described in section 3.908 of the Federal Acquisition Regulation. (c) The Contractor shall insert the substance of this clause, including...

  4. Section 1705 Loan Program

    Broader source: Energy.gov [DOE]

    The Section 1705 Loan Program authorizes loan guarantees for U.S.-based projects that commenced construction no later than September 30, 2011 and involve certain renewable energy systems, electric...

  5. Schlumberger soundings in the Upper Raft River and Raft River...

    Open Energy Info (EERE)

    soundings in the Upper Raft River and Raft River Valleys, Idaho and Utah Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Schlumberger soundings in the...

  6. Section 1251 Report Update

    National Nuclear Security Administration (NNSA)

    November 2010 Update to the National Defense Authorization Act of FY2010 Section 1251 Report New START Treaty Framework and Nuclear Force Structure Plans 1. Introduction This paper updates elements of the report that was submitted to Congress on May 13, 2010, pursuant to section 1251 of the National Defense Authorization Act for Fiscal Year 2010 (Public Law 111-84) ("1251 Report"). 2. National Nuclear Security Administration and modernization of the complex - an overview From FY 2005

  7. PART III - SECTION J

    National Nuclear Security Administration (NNSA)

    J, Page 1 SECTION J APPENDIX J DIVERSITY PLAN GUIDANCE In accordance with Section I clause DEAR 970.5226-1, Diversity Plan, this Appendix provides guidance to assist the Contractor in understanding the information being sought by the Department of Energy, National Nuclear Security Administration (DOE/NNSA) for each of the diversity elements within the clause. The Contractor shall submit a Diversity Plan to the Contracting Officer for approval within 90 days after the effective date of this

  8. Section II INT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6/14/11 Page 1 of 9 Printed copies of this document are uncontrolled. Retrieve latest version electronically. SANDIA CORPORATION SF 6432-IN (06/14/11) SECTION II GENERAL PROVISIONS FOR INTERNATIONAL COMMERCIAL TRANSACTIONS THE FOLLOWING CLAUSES APPLY TO THIS CONTRACT AS INDICATED UNLESS SPECIFICALLY DELETED, OR EXCEPT TO THE EXTENT THEY ARE SPECIFICALLY SUPPLEMENTED OR AMENDED IN WRITING IN THE SIGNATURE PAGE OR SECTION I OF THIS CONTRACT. IN01 ACCEPTANCE OF TERMS AND CONDITIONS This Contract

  9. Lower Colorado River Authority | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    from Lower Colorado River Authority on Smart Grid communications requirements

  10. EA-2030: Middle Entiat River Habitat Restoration Project; Chelan County, Washington

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration, in cooperation with the Bureau of Reclamation, is preparing an EA that evaluates the potential environmental impacts of a proposal to improve native fish habitat quality and quantity along a 4-mile section of the Entiat River and improve floodplain function by reconnecting the river with historic side channels and placing logs to direct river flow into side channels and onto the floodplain.

  11. Reese River Geothermal Project | Open Energy Information

    Open Energy Info (EERE)

    River Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Reese River Geothermal Project Project Location Information...

  12. Project Management Institute Highlights Savannah River Nuclear...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Management Institute Highlights Savannah River Nuclear Solutions in Publication Project Management Institute Highlights Savannah River Nuclear Solutions in Publication ...

  13. DOE F 3430.7A | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    A DOE F 3430.7A Form used in personnel performance appraisals for the employee to certify ... icon CERTIFICATIONS More Documents & Publications DOE F 3430.7 DOE F 3430.7C DOE F 3430.7B

  14. DOT-7A Type A packaging design guide

    SciTech Connect (OSTI)

    Kelly, D.L.

    1995-01-23

    The purpose of this Design Guide is to provide instruction for designing a U.S. Department of Transportation Specification 7A (DOT-7A) Type A packaging. Another purpose for this Design Guide is to support the evaluation and testing activities that are performed on new designs by a U.S. Department of Energy (DOE) test facility. This evaluation and testing program is called the DOT-7A Program. When an applicant has determined that a DOT-7A packaging is needed and not commercially available, a design may be created according to this document. The design should include a packaging drawing, specifications, analysis report, operating instructions, and a Packaging Qualification Checklist; all of which should be forwarded to a DOE/HQ approved test facility for evaluation and testing. This report is being submitted through the Engineering Documentation System so that it may be used for reference and information purposes.

  15. Ecotoxicology | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Savannah River NERP Research Opportunities Field Sites Data Research Facilities Low Dose Irradiation Facility Tritium Irrigation Facility Microsatellite Development Education ...

  16. 14655 Section J

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6, Mod 420 J.6-1 ATTACHMENT J.6 SMALL BUSINESS SUBCONTRACTING PLAN Plateau Remediation Contract Section J Contract No. DE-AC06-08RL14788 Attachment J.6, Mod 420 J.6-2 SMALL BUSINESS SUBCONTRACTING PLAN for United States Department of Energy Plateau Remediation Contract Submitted by: CH2M HILL PLATEAU REMEDIATION COMPANY Prime Contractor FISCAL YEARS 2009-2018 (Base and Option Period) CONTRACT NUMBER DE-AC06-08RL14788 Revision 4 December 30, 2014 Plateau Remediation Contract Section J Contract

  17. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix J: Recreation.

    SciTech Connect (OSTI)

    Columbia River System Operation Review

    1995-11-01

    This Appendix J of the Final Environmental Impact Statement for the Columbia River System discusses impacts on the recreational activities in the region. Major sections include the following: scope and processes; recreation in the Columbia River Basin today - by type, location, participation, user characteristics, factors which affect usage, and managing agencies; recreation analysis procedures and methodology; and alternatives and their impacts.

  18. Savannah River Site Robotics

    SciTech Connect (OSTI)

    2010-01-01

    Meet Sandmantis and Frankie, two advanced robotic devices that are key to cleanup at Savannah River Site. Sandmantis cleans hard, residual waste off huge underground storage tanks. Frankie is equipped with unique satellite capabilities and sensing abilties that can determine what chemicals still reside in the tanks in a cost effective manner.

  19. Savannah River Site Robotics

    ScienceCinema (OSTI)

    None

    2012-06-14

    Meet Sandmantis and Frankie, two advanced robotic devices that are key to cleanup at Savannah River Site. Sandmantis cleans hard, residual waste off huge underground storage tanks. Frankie is equipped with unique satellite capabilities and sensing abilties that can determine what chemicals still reside in the tanks in a cost effective manner.

  20. 14655 Section B

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    B Contract No. DE-AC06-05RL14655 166 B-i PART I - THE SCHEDULE SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS TABLE OF CONTENTS B.1 TYPE OF CONTRACT - ITEMS BEING ACQUIRED ..................................................................... 1 B.2 OBLIGATION AND AVAILABILITY OF FUNDS .............................................................................. 2 B.3 ALLOWABILITY OF SUBCONTRACTOR FEE ............................................................................... 2 B.4

  1. 14655 Section C

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    C Contract No. DE-AC06-05RL14655 226 C-i PART I - THE SCHEDULE SECTION C - STATEMENT OF WORK TABLE OF CONTENTS C.1 PURPOSE, OVERVIEW, END-STATES, AND ORGANIZATION ................................................... 1 C.1.1 PURPOSE AND OVERVIEW ................................................................................................ 1 C.1.2 END-STATES ........................................................................................................................ 1 C.1.3

  2. 14655 Section E

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    E Contract No. DE-AC06-05RL14655 A000 PART I - THE SCHEDULE SECTION E INSPECTION AND ACCEPTANCE TABLE OF CONTENTS E.1 FAR 52.246-5 INSPECTION OF SERVICES - COST REIMBURSEMENT (APR 1984) .................1 E.2 FIELD INSPECTION ..........................................................................................................................1 E.3 DOE INSPECTION ............................................................................................................................2 E.4

  3. SECTIONS B THROUGH H

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    B Contract No. DE-AC06-08RL14788 Modification 492 B-i PART I - THE SCHEDULE SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS TABLE OF CONTENTS B.1 TYPE OF CONTRACT ................................................................................................ B-1 B.2 ITEM(S) BEING ACQUIRED ....................................................................................... B-1 B.3 OBLIGATION AND AVAILABILITY OF FUNDS ........................................................... B-5 B.4 CONTRACT

  4. SECTIONS B THROUGH H

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    B Contract No. DE-AC27-08RV14800 Modification No. 372 B-i PART I - THE SCHEDULE SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS TABLE OF CONTENTS B.1 TYPE OF CONTRACT .................................................................................................... 2 B.2 ITEM(S) BEING ACQUIRED ........................................................................................... 2 B.3 OBLIGATION AND AVAILABILITY OF FUNDS ............................................................. 3 B.4

  5. SUMMARY REPORT FOR THE ANALYSIS OF THE SLUDGE BATCH 7A (MACROBATCH 8) DWPF POUR STREAM GLASS SAMPLE FOR CANISTER S03619

    SciTech Connect (OSTI)

    Johnson, F.

    2012-05-01

    In order to comply with the Waste Acceptance Specifications in Sludge Batch 7a (Macrobatch 8), Savannah River National Laboratory personnel characterized the Defense Waste Processing Facility (DWPF) pour stream glass sample collected while filling canister S03619. This report summarizes the results of the compositional analysis for reportable oxides and radionuclides, and the normalized Product Consistency Test (PCT) results. The PCT responses indicate that the DWPF produced glass that is significantly more durable than the Environmental Assessment glass. Results and further details are documented in 'Analysis of DWPF Sludge Batch 7a (Macrobatch 8) Pour Stream Samples,' SRNL-STI-2012-00017.

  6. 19F Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    p, X) (Incomplete) NSR Reaction Ep (MeV) Cross Section File X4 Dataset Date Added 1990WA10 19F(p, n): σ < 30 X4 04/26/2012 2008CO03 19F(p, γ): σ Ecm = 200 - 700 keV X4 05/14/2014 1979SU13 19F(p, γ): σ 0.2 - 1.2 X4 05/06/2014 2006COZY 19F(p, γ1): capture yield 200 - 800 keV thin target 12/08/2014 19F(p, γ): capture yield thick target 19F(p, α2γ): capture yield thin target, thick target 2008CO03 19F(p, γ1): reaction cross section Ecm = 200 - 800 keV thin target, thick target

  7. 33 U.S.C. 403: River and Harbors Act of 1899

    Broader source: Energy.gov [DOE]

    Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403) prohibits the unauthorized obstruction or alteration of any navigable water of the United States.

  8. 14655 Section J

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7, Modification 332 J.7-1 ATTACHMENT J.7 SMALL DISADVANTAGED BUSINESS PARTICIPATION PROGRAM TARGETS Plateau Remediation Contract Section J Contract No. DE-AC06-08RL14788 Attachment J.7, Modification 332 J.7-2 Small Disadvantaged Business (SDB) Participation Program Targets ATTACHMENT J.7 SMALL DISADVANTAGED BUSINESS PARTICIPATION PROGRAM TARGETS (a) OFFEROR - CH2M HILL Plateau Remediation Company - Prime: AREVA Federal Services, LLC; Fluor Federal Services, Inc. (base period only); East

  9. 14655 Section J

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8, Revision 3, 420 J.8-1 ATTACHMENT J.8 ADVANCE UNDERSTANDING OF COSTS In accordance with the Section H Clause entitled, Advance Understanding of Costs, this attachment sets forth the basis for determining the allowability of costs associated with expenditures that have cost implications under the Contract, that are not identified in other documents requiring the review and approval of the contracting officer. Unless a date is provided within an item of cost identified below, all items within

  10. 14655 Section J

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 J-1 PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS SECTION J -- LIST OF ATTACHMENTS TABLE OF CONTENTS Attachment Number Title of Attachment Modification Number Number of Pages J.1 ABBREVIATIONS AND ACRONYM LIST 0 6 J.2 REQUIREMENTS SOURCES AND IMPLEMENTING DOCUMENTS 331 8 J.3 HANFORD SITE SERVICES AND INTERFACE REQUIREMENTS MATRIX 246 107 J.4 PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) 249 50 J.5 PERFORMANCE GUARANTEE AGREEMENT 0 3 J.6 SMALL BUSINESS SUBCONTRACTING PLAN

  11. Notices SUPPLEMENTARY INFORMATION: Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    112 Federal Register / Vol. 77, No. 182 / Wednesday, September 19, 2012 / Notices SUPPLEMENTARY INFORMATION: Section 3506 of the Paperwork Reduction Act of 1995 (44 U.S.C. chapter 35) requires that Federal agencies provide interested parties an early opportunity to comment on information collection requests. The Director, Information Collection Clearance Division, Privacy, Information and Records Management Services, Office of Management, publishes this notice containing proposed information

  12. PART III - SECTION J

    National Nuclear Security Administration (NNSA)

    L, Page 1 SECTION J APPENDIX L SPECIAL FINANCIAL INSTITUTION AGREEMENT FOR USE WITH THE PAYMENTS-CLEARED FINANCING ARRANGEMENT Note: (1) The Contractor shall enter into a new banking agreement(s) during the Transition Term of the Contract, utilizing the format contained in this Appendix and include other applicable Contract terms and conditions. (2) Items in brackets [ ] below are provided for clarification and will be removed from the document prior to execution. Agreement entered into this,

  13. Part III - Section J

    National Nuclear Security Administration (NNSA)

    Corporation Contract No. DE-AC04-94AL85000 Modification No. 585 Attachment 2 Page 1 of 5 Part III - Section J Appendix G List of Applicable Directives and NNSA Policy Letters In addition to the list of applicable directives referenced below, the contractor shall also comply with supplementary directives (e.g., manuals), which are invoked by a Contractor Requirements Document (CRD) attached to a directive referenced below. This List excludes directives that have been granted an exemption from the

  14. Part III - Section J

    National Nuclear Security Administration (NNSA)

    H DIVERSITY PLAN GUIDANCE To Be Updated during Transition With regard to the Contract Section I Clause entitled "Diversity Plan", this Appendix provides guidance to assist the Contractor in understanding the information being sought by the Department for each of the clause's Diversity elements. If the Contractor's current policy or procedure already addresses the following elements, the Contractor need only provide a copy of the policy or procedure to the Contracting Officer and

  15. Salt Waste Disposal at the Savannah River Site | Department of Energy

    Energy Savers [EERE]

    Salt Waste Disposal at the Savannah River Site Salt Waste Disposal at the Savannah River Site Section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005 authorizes the Secretary of Energy, in consultation with the Nuclear Regulatory Commission, to reclassify certain waste from reprocessing spent nuclear fuel from high-level waste to low-level waste if it meets the criteria set forth in Section 3116. Currently, DOE SRS has prepared one final (salt waste) and is

  16. The Savannah River Site's Groundwater Monitoring Program, third quarter 1991

    SciTech Connect (OSTI)

    Not Available

    1992-02-17

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site's (SRS) Groundwater Monitoring Program. During third quarter 1991, EPD/EMS conducted extensive sampling of monitoring wells. Analytical results from third quarter 1991 are listed in this report.

  17. Savannah River Technology Center monthly report, September 1992

    SciTech Connect (OSTI)

    Ferrell, J.M.

    1992-09-01

    This is a monthly progress report from the Savannah River Laboratory for the month of September, 1992. It has sections dealing with work in the broad areas of reactor safety, tritium processes and absorption, separations programs and wastes, environmental concerns and responses, waste management practices, and general concerns.

  18. Hood River Passive House

    SciTech Connect (OSTI)

    Hales, D.

    2013-03-01

    The Hood River Passive Project was developed by Root Design Build of Hood River Oregon using the Passive House Planning Package (PHPP) to meet all of the requirements for certification under the European Passive House standards. The Passive House design approach has been gaining momentum among residential designers for custom homes and BEopt modeling indicates that these designs may actually exceed the goal of the U.S. Department of Energy's (DOE) Building America program to reduce home energy use by 30%-50% (compared to 2009 energy codes for new homes). This report documents the short term test results of the Shift House and compares the results of PHPP and BEopt modeling of the project.

  19. Voluntary Protection Program Onsite Review, Savannah River Nuclear...

    Office of Environmental Management (EM)

    River Nuclear Solutions, Llc Savannah River Site - October 2014 Voluntary Protection Program Onsite Review, Savannah River Nuclear Solutions, Llc Savannah River Site - October 2014 ...

  20. EA-1981: Bonneville-Hood River Transmission Line Rebuild, Multnomah...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    81: Bonneville-Hood River Transmission Line Rebuild, Multnomah and Hood River Counties, Oregon EA-1981: Bonneville-Hood River Transmission Line Rebuild, Multnomah and Hood River ...

  1. 10Be Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Be(p, X) (Current as of 03/01/2016) NSR Reaction Ep (MeV) Cross Section File X4 Dataset Date Added 1970GO04 10Be(p, γ0): σ 0.6 - 6.3 θ = 0°, θ = 90° 06/05/2012 1987ERZY 10Be(p, n): σ 0.9 - 2 X4 05/15/2012 The following references may be related but not included. 1991GOZV Back to (p, X) Main Page Back to (α, X) Main Page Back to Datacomp Home Page Last modified: 02 March 2016

  2. 14655 Section J

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2, Modification 476 J.2-1 ATTACHMENT J.2 REQUIREMENTS SOURCES AND IMPLEMENTING DOCUMENTS The following lists are provided in accordance with the Section I Clause entitled, DEAR 970.5204-2, Laws, Regulations, and DOE Directives. LIST A: APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS Table J.2.1 Code of Federal Regulations (CFR) Document Number Title 10 CFR 63 Disposal of High-Level Radioactive Wastes in a Geologic Repository at Yucca Mountain, Nevada 10 CFR 71 Packaging And Transportation Of

  3. 14655 Section J

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0, Revision 5 J.10-1 ATTACHMENT J.10 WAGE DETERMINATIONS - SERVICE CONTRACT ACT (SCA) AND DAVIS-BACON ACT Plateau Remediation Contract Section J Contract No. DE-AC06-08RL14788 Attachment J.10, Revision 5 J.10-2 SERVICE CONTRACT ACT WAGE DETERMINATION WD 05-2569 (Rev.-18) was first posted on www.wdol.gov on 07/14/2015 ***************************************************************************** REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR THE SERVICE CONTRACT ACT | EMPLOYMENT

  4. HASQARD Section 4

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    HASQARD Section 4.2.4, Volume 2, Revision 3 requires: "The field custodian shall seal the cap of the individual sample container so that any tampering is easy to detect. Custody seals shall be used to verify that sample integrity has been maintained during transport." The HASQARD Focus Group provides the following clarification to the requirement: Note: The presence of, or fixative residue from, custody seals can interfere with the functionality of equipment used during analysis (e.g.,

  5. HASQARD Section 4

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    text of the sixth paragraph in HASQARD Volume 2, Revision 3, Section 4.2.4 is revised to say: "Custody seals shall be used to verify that sample integrity has been maintained during transport. The field custodian shall seal the cap of the individual sample container so that any tampering is easy to detect. In lieu of using a custody seal directly applied to sample containers, the sample container may be placed inside a secondary container that is sealed with a custody seal. Custody tape

  6. Section II INT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (11-03-2010) Title: Standard Terms & Conditions for International Commercial Transactions Owner: Procurement Policy & Quality Dept Initial Release Date: 11/3/10 Page 1 of 8 PPQD-TMPLT-008R01 Template Release Date: 12/01/09 Printed copies of this document are uncontrolled. Before using a printed copy to perform work, verify the version against the electronic document to ensure you are using the correct version. SANDIA CORPORATION SF 6432-IN (11-03-2010) SECTION II GENERAL PROVISIONS FOR

  7. Section II INT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    IN (01-12-2010) Title: Standard Terms & Conditions for International Commercial Transactions Owner: Procurement Policy & Quality Dept Initial Release Date: 01/12/10 Page 1 of 6 PPQD-TMPLT-008R01 Template Release Date: 12/01/09 Printed copies of this document are uncontrolled. Before using a printed copy to perform work, verify the version against the electronic document to ensure you are using the correct version. SANDIA CORPORATION SF 6432-IN (01-12-2010) SECTION II GENERAL PROVISIONS

  8. DOE F 1325.7A | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    A DOE F 1325.7A Provides instructions for using the Department's Secure Automatic Communications Network (SACNET), PDF icon Telecommunication Message Data: SACNET Users Guide More Documents & Publications DOE F 1325.7 DOE F 470.10 Security Policy, CMPC Marking Resource

  9. Look to the River Columbia River Opens New Opportunities for...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Volume One Film Collection Volume Two 75th Anniversary Hydropower in the Northwest Woody Guthrie Videos Strategic Direction Branding & Logos Power of the River History Book...

  10. about Savannah River National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Gas Transfer Systems and Reservoir Development Gas Transfer Systems and Reservoir Development The Savannah River Site (SRS) is rich in history for its involvement in the nation's nuclear defense program. For over 50 years, SRS and the Savannah River National Laboratory (SRNL) have developed the expertise necessary to be the premier laboratory for tritium processing and its relation to new reservoir design. SRNL is the bridge between the weapon Design Agencies and the Savannah River Tritium

  11. Section L, Paragraph L-4

    National Nuclear Security Administration (NNSA)

    D SECTION L ATTACHMENT D CROSS REFERENCE MATRIX Section L Section M Offeror's Proposal Criterion 1: PAST PERFORMANCE L-15 (a) M-3 (a) Criterion 2: SITE ORGANIZATION AND...

  12. 10B Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    α, X) (Current as of 01/21/2015) NSR Reaction Eα (MeV) Cross Section File X4 Dataset Date Added 1992MC03 10B(α, α): σ relative to Rutherford scattering 1 - 3.3 X4 05/02/2012 1969GA01 10B(α, p), (α α'): relative σ at θ = 90° for Eγ = 1.0 - 3.5 0.170 MeV, 3.088 MeV, 3.682 MeV, 3.852 MeV, 0.717 MeV 06/18/2012 1973VA25 10B(α, n): laboratory differential σ 1.0 - 5.0 for n0: θ = 0°, θ = 90°, θ = 160° X4 04/04/2011 for n1: θ = 0°, θ = 90° for n23: θ = 0°, θ = 90° 10B(α, n):

  13. 11B Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    B(α, X) (Current as of 02/01/2016) NSR Reaction Eα (MeV) Cross Section File X4 Dataset Date Added 1991WA02 11B(α, n): thick-target yield of Eα = 411, 605 and 606 keV resonance 350 - 2400 keV 1 X4 04/04/2011 11B(α, n): for 606-keV resonance 1 11B(α, n): for 411-keV resonance after subtraction of the 605-keV resonance 1 11B(α, n): S-factor 1 11B(α, n): S-factor for thick-target 400 - 500 keV 1 11B(α, n): S-factor for thin-target 1 1966MA04, Errata 11B(α, n): excitation curve < 4.5 for

  14. 11C Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    C(p, X) (Current as of 03/01/2016) NSR Reaction Ep (MeV) Cross Section File X4 Dataset Date Added 2013SO11 11C(p, γ): deduced astrophysical reaction rates and S-factors X4 12/14/2015 2003LI51 11C(p, γ): deduced S-factor low X4 09/12/2011 2003TA02 11C(p, γ): deduced S-factor 0 - 0.7 X4 09/12/2011 2003KU36 11C(p, p): elastic scattering σ ~ 0.2 - 3.2 θcm = 180° 09/08/2011 Back to (p, X) Main Page Back to (α, X) Main Page Back to Datacomp Home Page Last modified: 02 March

  15. 12C Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    p, X) (Current as of 05/15/2012) NSR Reaction Ep (MeV) Cross Section File X4 Dataset Date Added 2001NE15 12C(p, γ): σ, deduced S(E) ratio < 160 keV X4 10/28/2014 1993CH02 12C(p, X): σ for η production ≤ 0.9 GeV X4 03/07/2012 1974RO29 12C(p, γ): σ 150 - 3000 keV X4 08/27/2013 1951GO1B 12C(p, p): yield curve of elastic scattering 0.2 - 4.0 θ = 164° 11/05/2014 1976ME22 12C(p, p): absolute σ 0.3 - 2.0 X4 08/07/2013 2008BU19 12C(p, γ): σ, deduced S-factors. 354, 390, 460, 463, 565,

  16. 13C Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    p, X) (Current as of 03/01/2016) NSR Reaction Ep (MeV) Cross Section File X4 Dataset Date Added 2001NE15 13C(p, γ): σ, deduced S(E) ratio < 160 keV X4 09/12/2011 1994KI02 13C(p, γ): γ-ray yield, calculated S(E) 120 - 950 keV X4 09/12/2011 2008HE11 13C(p, γ): reaction yield at the resonance 448.5-keV for a fresh target and after an integrated charge of 1C 435 - 470 keV σ X4 11/07/2011 1991BR19 13C(p, γ): reaction yield near the resonance 0.44 - 0.6 483.3-keV, 0.55-MeV X4 11/07/2011

  17. 13C Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    α, X) (Current as of 02/08/2016) NSR Reaction Eα (MeV) Cross Section File X4 Dataset Date Added 2006JO11 13C(α, n): deduced S(E) ~ 0 - 1 from (1993BR17), from (1993DR08) X4 08/04/2011 2001HE22 13C(α, n): S(E) 0 - 2 S-factor 11/15/2011 2003KA51 13C(α, n): deduced S-factors, reaction rate Ecm ~ 200 - 800 keV X4 05/01/2012 1993DR08 13C(α, n): excitation function and S(E) ~ 275 - 1075 keV σ, S-factor X4 08/04/2011 2008HE11 13C(α, n): σ, reaction yields and S(E) Ecm = 320 - 700 keV σ, Table

  18. 14N Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    p, X) (Incomplete) NSR Reaction Ep (MeV) Cross Section File X4 Dataset Date Added 2003MU12 14N(p, γ): deduced astrophysical S-factors < 600 keV X4 05/06/2013 1990WA10 14N(p, n): σ < 30 X4 04/26/2012 2005CO16, 2006BE50 14N(p, γ): σ, deduced astrophysical S-factors, resonance strength 70 - 228 keV X4 05/08/2013 2006LE13 14N(p, γ): σ, deduced astrophysical S-factors 70 - 228 keV X4 05/30/2013 2005BR04, 2005BR15 14N(p, γ): astrophysical S-factors ~ 0.1 - 2.5 1 08/15/2013 2004FO02,

  19. 14N Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    α, X) (Current as of 05/14/2012) NSR Reaction Eα (MeV) Cross Section File X4 Dataset Date Added 1971CO27 14N(α, γ): thick target yield 0.5 - 1.2 1 08/04/2011 2000GO43 14N(α, γ): resonance yields, deduced astrophysical reaction rates 550 - 1300 keV X4 03/01/2012 1973RO03 14N(α, γ): γ-ray yield 1.0 - 3.2 1 04/30/2012 1980MA26 14N(α, α): σ 1.5, 1.6 X4 03/01/2012 2007CH25 14N(α, γ): deduced resonance parameters 1620 - 1775 keV X4 03/01/2012 1994YE11 14N(α, α): σ(θ)/σ(Rutherford) 2

  20. 16O Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    p, X) (Incomplete) NSR Reaction Ep (MeV) Cross Section File X4 Dataset Date Added 1973MC12 16O(p, α): σ threshold - 7.7 X4 10/17/2012 1981DY03 16O(p, pα): σ for production of γ-rays threshold - 23 4.44-MeV γ-rays X4 03/15/2011 16O(p, p'): σ for production of γ-rays threshold - 23 6.13-MeV γ-rays 1997MO27 16O(p, p), (p, γ): elastic, capture σ Ecm = 200 - 3750 keV X4 03/28/2013 1973RO34 16O(p, γ): S(E) 0.3 - 3.1 S-Factor X4 05/10/2011 16O(p, γ): differential σ for the DC → ground

  1. 4He Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    α, X) (Current as of 05/14/2012) NSR Reaction Eα (MeV) Cross Section File X4 Dataset Date Added 2013DA10 4He(α, γ): deduced σ 19 - 29 X4 01/27/2016 1978HI04 4He(α, α): elastic scattering excitation function 32.6 - 35.4 θ = 30.5°, θ = 53.7°, θ = 54.7°, θ = 71.5°, θ = 90.0° 04/24/2012 1995DE18 4He(α, γ): excitation function for the decay to the 3 MeV level 33 - 34.7 θlab = 90.0° 04/24/2012 1975NA12 4He(α, γ): excitation function 33 - 36 1 07/19/2011 1977PA26 4He(α, γ): γ

  2. 6Li Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    p, X) (Current as of 03/01/2016) NSR Reaction Ep (MeV) Cross Section File X4 Dataset Date Added 2004TU02 6Li(p, α): coincidence yields, deduced S-factors low 1, S-factors from direct data, S-factors from indirect data 03/20/2012 2004TU06 6Li(p, α): σ, coincidence yields, deduced S-factors low σ, coincidence yields, S-factors from direct data, S-factors from indirect data 03/20/2012 1966GE11 6Li(p, α): S-factor Ec.m. = 0.01 - 1.00 X4 12/15/2015 2005CR05 6Li(p, α): S-factor 20 - 100 keV X4

  3. 6Li Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    α, X) (Current as of 02/01/2016) NSR Reaction Eα (MeV) Cross Section File X4 Dataset Date Added 1985NE05 6Li(α, γ): γ thick target yield resonance X4 02/15/2012 1966FO05 6Li(α, γ): σ 0.9 - 3.0 2 < Eγ < 4 MeV, 4 < Eγ < 7 MeV, thick target capture γ-ray yield, capture γ-ray yield of 2.43 MeV resonance 02/29/2012 1989BA24 6Li(α, γ): σ 1.085, 1.175 X4 02/15/2012 1979SP01 6Li(α, γ): thick target yield curve for 718 keV γ-rays 1140 - 1250 keV 1175 keV resonance 07/19/2011

  4. 7Li Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    p, X) (Current as of 12/16/2015) NSR Reaction Ep (MeV) Cross Section File X4 Dataset Date Added 1997GO13 7Li(pol. p, γ): total σ, S-factor for capture to third-excited state 0 - 80 keV X4 06/12/2014 1994CH23 7Li(pol. p, γ): deduced S-factor ≤ 80 keV X4 06/12/2014 1999SP09 7Li(p, α): deduced S-factor < 0.4 X4 06/12/2014 1974BU16 7Li(p, n): σ < 3.8 X4 03/14/2012 2011PI04 7Li(p, α): analyzed excitation functions Ecm = 0 - 7 X4 06/12/2014 2001LA35 7Li(p, α): deduced S(E)-factor 10 -

  5. 18O Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    α, X) (Current as of 05/14/2012) NSR Reaction Eα (MeV) Cross Section File X4 Dataset Date Added 2003DA19 18O(α, γ): deduced resonance strengths ~ 470 - 770 keV X4 02/13/2012 1978TR05 18O(α, γ): excitation function for the 1.27 MeV secondary γ-ray transition 0.6 - 2.3 θγ = 0° 02/29/2012 1990VO06 18O(α, γ): resonance γ yields < 0.78 X4 02/13/2012 1973BA10 18O(α, n): σ with target thickness 1 - 5 6 keV, 13 keV 06/06/2011 1956BO61 18O(α, n): neutron yields 1.8 - 5.3 0° - 30° X4

  6. 19F Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    α, X) (Current as of 02/08/2016) NSR Reaction Eα (MeV) Cross Section File X4 Dataset Date Added 2008UG01 19F(α, p): yield curves, σ 792 - 1993 keV X4 09/14/2011 2005UG04 19F(α, p1γ): excitation curve 1238 - 2009 keV 1 11/30/2011 19F(α, p0): excitation curve 1 19F(α, p1): excitation curve 1 1984CS01 19F(α, α): σ 1.5 - 3.7 X4 09/14/2011 1994CH36 19F(α, α): σ 1.5 - 4.5 X4 09/14/2011 2000WR01 19F(α, n): neutron yields and σ 2.28 - 3.10 X4 09/14/2011 1977VA10 19F(α, n): differential

  7. 20Ne Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    p, X) (Current as of 05/15/2012) NSR Reaction Ep (MeV) Cross Section File X4 Dataset Date Added 1981DY03 20Ne(p, p'γ): σ for production of γ-rays threshold - 23 1.63-MeV γ-rays X4 03/15/2011 20Ne(p, pαγ): σ for production of γ-rays threshold - 23 6.13-MeV γ-rays 1975RO08 20Ne(p, γ): S-factors 0.37 - 2.10 Direct Capture (DC) → 332-keV state, DC → 2425-keV state, tail of 2425-keV state X4 04/19/2011 20Ne(p, γ): differential σ at θγ = 90° DC → 332-keV state, 332-keV state →

  8. Smith River Rancheria- 2006 Project

    Broader source: Energy.gov [DOE]

    Smith River Rancheria has a strong commitment to becoming energy self-sufficient, reduce their energy costs, and stimulate economic development in the community.

  9. RiverHeath Appleton, WI

    Office of Energy Efficiency and Renewable Energy (EERE)

    The goal of the project is to produce a closed loop neighborhood-wide geothermal exchange system using the river as the source of heat exchange.

  10. Employment | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Openings are posted on the UGA Human Resources website. To search for employment opportunities at SREL, select Department 267 (Savannah River Ecology Laboratory). UGA HR...

  11. SECTION J, APPENDIX B - PEP

    National Nuclear Security Administration (NNSA)

    SECTION J APPENDIX B PERFORMANCE EVALUATION PLAN Replaced by Mods 002, 016, 020, 029, 0084 Intentionally left blank for Internet posting purposes. Section J, Appendix B, Page 1

  12. PART III-SECTION J

    National Nuclear Security Administration (NNSA)

    C SECTION J APPENDIX C TRANSITION PLAN Plan: To be inserted by the Contracting Officer. Requirements: In accordance with Section F, Deliverables During Transition, the Contractor...

  13. SECTION J, APPENDIX B - PEP

    National Nuclear Security Administration (NNSA)

    SECTION J APPENDIX B PERFORMANCE EVALUATION PLAN Replaced by Mods 002, 016, 020, 029, 0084 Intentionally left blank for Internet posting purposes. Section J, Appendix B, Page 1...

  14. Certification for DOE G 440.1-7A

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-01-04

    The Department of Energy Guide 440.1-7A, Implementation Guide for use with Title 10, Code of Federal Regulations, Part 850 (10 C.F.R. 850), Chronic Beryllium Disease Prevention Program, dated January 4, 2001, has been reviewed by our organization and deemed to be in compliance with related Departmental directives, Secretarial delegations, organizational structure, budget guidelines, regulations, standards, Office of Management and Budget guidance, relevant Memoranda of Understanding and public laws.

  15. River Protection Project FY 2000 Multi Year Work Plan Summary

    SciTech Connect (OSTI)

    LENSEIGNE, D.L.

    1999-08-27

    The River Protection Project (RPP), formerly the Tank Waste Remediation System (TWRS), is a major part of the U.S. Department of Energy's (DOE) Office of River Protection (ORP). The ORP was established as directed by Congress in Section 3139 of the Strom Thurmond National Defense Authorization Act for Fiscal Year (FY) 1999. The ORP was established to elevate the reporting and accountability for the RPP to the DOE-Headquarters level. This was done to gain Congressional visibility and obtain support for a major $10 billion high-level liquid waste vitrification effort.

  16. River and Plateau Committee

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    December 2011) Page 1 Area RAP Committee Area of Interest Issue Manager(s) (*denotes lead) Other interested committee members Focus/Product For FY2012 Framing Questions/Issues (Articulated by Issue Managers) Cross- cutting River Corridor 100 & 300 Areas * 100 B/C Area * 100 K Area * 100 N Area * 100 D & H Areas * 100 F Area * 300 Area Shelley Cimon Dale Engstrom* Liz Mattson Jean Vanni Gerry Pollet Bob Suyama Wade Riggsbee 6 RODs RI/FS and Proposed Plans to be issued between now &

  17. River and Plateau Committee

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2/15 River and Plateau Committee Priorities for advice on FY17 budget Not in priority order, numbering refers to last year's related advice points, per DOE response  (#1) The Board strongly urges DOE-Headquarters (HQ) to request full funding from Congress to meet all legal requirements of the ongoing cleanup work in FY 2016 and 2017 in addition to the following specific requests.  (#5) The Board advises DOE-RL to restore funding for removal and treatment of thousands of stored containers

  18. North Sky River | Open Energy Information

    Open Energy Info (EERE)

    Sky River Jump to: navigation, search Name North Sky River Facility North Sky River Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner NextEra...

  19. 10B Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    p, X) (Current as of 05/15/2012) NSR Reaction Ep (MeV) Cross Section File X4 Dataset Date Added 2010LA11 10B(p, α): deduced S(E) E(cm) = 0 - 0.15 1 11/30/2011 1993AN06 10B(p, α): α yield E(cm) = 17 - 134 keV X4 11/07/2011 1993AN09 10B(p, α): absolute fusion σ and S(E) E(cm) = 48 - 159 keV X4 11/07/2011 1972SZ02 10B(p, α): total reaction σ and S(E) 60 - 180 keV 1 X4 03/03/2011 1983WI09 10B(p, γ): γ yield, capture σ(E) 0.07 - 2.2 X4 11/07/2011 2003TO21 10B(pol. p, γ): σ, deduced

  20. 11B Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    p, X) (Current as of 12/17/2015) NSR Reaction Ep (MeV) Cross Section File X4 Dataset Date Added 2004RO27, 2004SP03 11B(p, α): deduced σ, S-factor Ecm ~ 0 - 1 X4 11/07/2012 2010LA11 11B(p, α): deduced S-factor E(cm) = 0 - 0.6 1 11/30/2011 2000KE10 11B(pol. p, γ): σ, deduced S-factor < 100 keV X4 11/07/2012 1993AN06 11B(p, α): α yield E(cm) = 17 - 134 keV X4 11/29/2012 1979DA03 11B(p, 3α): σ 35.4 - 1500 keV X4 07/30/2014 1992CE02 11B(p, γ): deduced S-factor 40 - 180 keV X4 03/07/2012

  1. 12C Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    α, X) (Current as of 05/14/2012) NSR Reaction Eα (MeV) Cross Section File X4 Dataset Date Added 2009MA70 12C(α, γ0): σ 0 - 2.27 X4 05/01/2012 2012OU01 12C(α, γ): deduced S-factor Ecm = 0.3 - 3.5 X4 02/12/2015 1997KU18 12C(α, γ): analyzed S-factor Ecm = 0.9 - 3 X4 05/10/2012 1987RE02 12C(α, γ): σ, deduced S-factor 0.94 - 2.84 X4 05/09/2012 2001HA31 12C(α, γ): deduced S-factors Ecm = 0.95 - 2.78 E1, E2 06/18/2012 2001KU09 12C(α, γ): deduced S-factor Ecm = 0.95 - 2.8 X4 05/09/2012

  2. 14C Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    C(p, X) (Incomplete) NSR Reaction Ep (MeV) Cross Section File X4 Dataset Date Added 1969SI04 14C(p, γ): γ-rays yield for 230 - 690 keV Eγ ≥ 2.8 MeV 08/15/2013 1990GO25 14C(p, γ): σ, deduced S-factor 250 - 740 keV X4 10/28/2014 1968HE12 14C(p, γ): γ-ray yield 0.6 - 2.7 γ0 01/06/2015 1991WA02 14C(p, n): σ 1.0 - 1.55 X4 10/28/2014 1968HA27 14C(p, p): σ at θcm = 1.0 - 2.7 39.2°, 54.7°, 90°, 125.3°, 161.4° 08/15/2013 1971KU01 14C(p, γ0): excitation function at θ = 90° 1.3 - 2.6 1

  3. 15N Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    p, X) (Current as of 05/15/2012) NSR Reaction Ep (MeV) Cross Section File X4 Dataset Date Added 1990WA10 15N(p, n): σ < 30 X4 04/26/2012 1982RE06 15N(p, α): σ 78 - 810 keV X4 09/12/2011 1979ZY02 15N(p, α0): σ, deduced S-factor 93 - 418 keV X4 09/12/2011 2010LE21, 2013DE03 15N(p, γ): σ, S-factors 130 - 1800 keV X4 05/01/2012 & 02/01/2016 2012IM02 15N(p, γ), (p, αγ): σ, S-factors 0.14 - 1.80 X4 02/01/2016 1974RO37 15N(p, γ), (p, αγ): σ 150 - 2500 keV X4 09/12/2011 1968GO07

  4. 15N Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    α, X) (Current as of 05/14/2012) NSR Reaction Eα (MeV) Cross Section File X4 Dataset Date Added 2002WI18 15N(α γ): σ 461 - 2642 keV X4 09/12/2011 1997WI12 15N(α γ): σ 0.65 - 2.65 X4 09/12/2011 1995WI26 15N(α γ): σ 0.67 - 0.69 X4 09/12/2011 1969AI01 15N(α γ): γ-ray excitation curve for 3.0 ≤ Eγ ≤ 7.0 MeV 2.5 - 3.2 1 11/30/2011 1977DI08 15N(α, γ): γ-ray excitation curve near Eα = 3.15 MeV for transitions to 3146 - 3158 keV five low-lying states, 4.65 MeV (13/2+) state

  5. 16O Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6O(α, X) (Current as of 02/08/2016) NSR Reaction Eα (MeV) Cross Section File X4 Dataset Date Added 1971TO06 16O(α, γ): σ 0.85 - 1.8 X4 09/15/2011 1953CA44 16O(α, α): σ 0.94 - 4.0 X4 09/15/2011 1997KU18 16O(α, γ): analyzed S-factor 1 - 3.25 X4 05/10/2012 1980MA27 16O(α, α): σ 1.305 - 1.330; 2.950 - 3.075 X4 02/14/2012 16O(α, γ): σ 1.37, 2.6, 2.9, 3.036 1987HA24 16O(α, γ): σ Ecm = 1.7 - 2.35 X4 02/14/2012 1990LE06 16O(α, α): σ 1.8 - 5 X4 03/12/2011 1985JA17 16O(α, α): σ 2

  6. 17O Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    p, X) (Current as of 05/15/2012) NSR Reaction Ep (MeV) Cross Section File X4 Dataset Date Added 2010SE11 17O(p, α): nuclear excitation function 0 - 0.7 1 06/22/2011 1973RO03 17O(p, γ): γ-ray yield 0.15 - 1.4 1 08/01/2012 2015BU02 17O(p, γ): total S(E)-factors 0.17 - 0.53 X4 03/03/2016 2012SC16, 2014DI01 17O(p, γ): σ, deduced S-factors Ecm = 0.2 - 0.4 X4 03/03/2016 1973RO34 17O(p, γ): S(E) 0.3 - 1.9 S-Factor X4 06/22/2011 17O(p, γ): σ for the γ-ray transition 0.94 → 0 MeV 17O(p, γ):

  7. 17O Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    α, X) (Current as of 02/08/2016) NSR Reaction Eα (MeV) Cross Section File X4 Dataset Date Added 2013BE11; see also 2012BEZP 17O(α, n), (α, γ): σ, S-factors 0.8 - 2.3 X4 02/12/2015 1973BA10 17O(α, n): neutron yields with target thickness 0.9 - 5.3 ~ 2.5 keV, 6 keV, 13 keV, ~ 35 keV 06/06/2011 1976MC12 17O(α, n1): yield of 1.63-MeV γ's 1.4 - 2.3 θγ = 50° 04/28/2011 17O(α, n0): yield of neutrons θn = 120° 17O(α, n1): yield of 1.63-MeV γ's 1.825 - 1.885 θγ = 0° 05/03/2011 17O(α,

  8. 3H Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3H(α, X) (Current as of 02/01/2016) NSR Reaction Eα (MeV) Cross Section File X4 Dataset Date Added 2001TO07 3H(α, γ): deduced S-factor Ecm = 0.05 - 0.8 X4 01/09/2012 1994BR25 3H(α, γ): deduced σ and S-factor Ecm = 50 - 1200 keV X4 01/09/2012 1987SC18 3H(α, γ): σ, deduced S-factor Ecm = 79 - 464 keV X4 01/09/2012 1988SA13 3H(α, α): recoil σ 0.5 - 2.5 X4 01/09/2012 1987BU18 3H(α, γ): σ and S-factor 0.7 - 2 X4 01/09/2012 1968IV01 3H(α, α): elastic scattering σ 3 - 11 Table 9 X4

  9. 3He Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    α, X) (Current as of 05/14/2012) NSR Reaction Eα (MeV) Cross Section File X4 Dataset Date Added 1982KR05 3He(α, γ): σ Ecm = 107 - 1266 keV X4 01/05/2012 1969NA24 3He(α, γ): σ and S-factor 164 - 245 keV σ, S(E) X4 07/19/2011 1984OS03 3He(α, γ): σ 165 - 1169 keV X4 01/05/2012 1982OS02 3He(α, γ): S-factor 165 - 1170 keV S34(Ecm) X4 07/19/2011 1988HI06 3He(α, γ): σ Ecm = 195 - 686 keV X4 01/05/2012 2007CO17 3He(α, γ): deduced σ and S-factor 220, 250, 400 keV X4 01/05/2012

  10. 4He Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    p, X) (Current as of 03/01/2016) NSR Reaction Ep (MeV) Cross Section File X4 Dataset Date Added 1974KR07 4He(p, p): σ 0.5 - 3 X4 10/23/2014 2004PU02 4He(p, p): σ(θ = 128.7°) 1.2 - 5.2 X4 10/23/2014 1997NU02 4He(p, p): σ 1.4 - 6 X4 10/23/2014 1976BR17 4He(p, p): σ(168.8°)/σ(104.4°) 2.24 - 5.90 X4 10/23/2014 1977DO01 4He(p, p): σ 11 - 14 X4 10/23/2014 1969GA12 4He(p, p): σ 12.04, 14.23, 17.45 X4 10/23/2014 1974SO06 4He(p, X): total reaction σ 18 - 48 1 03/08/2011 1976SO01 4He(p, X),

  11. 9Be Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9Be(p, X) (Current as of 03/01/2016) NSR Reaction Ep (MeV) Cross Section File X4 Dataset Date Added 1997ZA06 9Be(p, α), (p, d): S-factor 16 - 390 keV X4 01/23/2013 1973SI27 9Be(p, α), (p, d): σ 30 - 700 keV X4 01/24/2013 1992CE02 9Be(p, γ): deduced S-factor 40 - 180 keV X4 03/07/2012 1995ZA04 9Be(p, γ): deduced σ 75 - 1800 keV X4 01/23/2013 1994LI51 9Be(p, p): σ at θ = 170° 0.15- 3 X4 01/11/2012 1973SZ07 9Be(p, γ): σ 200 - 750 keV X4 01/09/2013 1972RE07 9Be(p, γ): σ 0.20 - 0.85 X4

  12. 18O Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8O(p, X) (Current as of 05/15/2012) NSR Reaction Ep (MeV) Cross Section File X4 Dataset Date Added 2008LA06 18O(p, α): deduced S-factor Ecm = 0 - 1.5 θα = 46° 12/03/2012 1990CH32 18O(p, α): σ < 2 X4 10/04/2012 1990VO06 18O(p, γ): resonance γ yields < 0.22 X4 02/13/2012 2008LA13 18O(p, α): deduced σ 0 - 250 keV X4 10/20/2014 1973BA31 18O(p, n): total neutron-production σ < 5 1 X4 05/10/2011 1990WA10 18O(p, n): σ < 30 X4 04/26/2012 1979LO01 18O(p, α): σ 72 - 935 keV X4

  13. 20Ne Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    20Ne(α, X) (Current as of 02/08/2016) NSR Reaction Eα (MeV) Cross Section File X4 Dataset Date Added 1983SC17 20Ne(α, γ): deduced S-factor of capture σ 0.55 - 3.2 X4 09/15/2011 1997WI12 20Ne(α, γ): deduced primary transitions yield 1.64 - 2.65 X4 09/15/2011 1999KO34 20Ne(α, γ): γ-ray yield for the transition 1.9 - 2.8 g.s. 01/03/2012 1369 keV g.s. 10917 keV g.s., 1369 keV 11016 keV g.s. 1975KU06 20Ne(α, γ): σ 2.5 - 20 X4 09/15/2011 1968HI02 20Ne(α, γ): σ 3 - 6 X4 09/15/2011

  14. The Savannah River Site's Groundwater Monitoring Program

    SciTech Connect (OSTI)

    Not Available

    1992-01-10

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site's (SRS) Groundwater Monitoring Program. During second quarter 1991 EPD/EMS conducted extensive sampling of monitoring wells. EPD/EMS established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead, they aid personnel in sample scheduling, interpretation of data, and trend identification. Beginning in 1991, the flagging criteria are based on EPA drinking water standards and method detection limits. A detailed explanation of the current flagging criteria is presented in the Flagging Criteria section of this document. Analytical results from second quarter 1991 are listed in this report.

  15. Dry calorimetry at the Savannah River Site

    SciTech Connect (OSTI)

    ReFalo, L.A.

    1992-01-01

    Heat flow calorimeters are used at the Savannah River Site to assay radioactive sources by measuring the emitted thermal power. The radioactive source is placed in a constant temperature environment and its thermal output is measured by non-destructive assay techniques. The isotopic mass is computed from the measured power through known watts/gram constants for each of the isotopes. The Equipment Engineering Section of the Savannah River Laboratory has developed calorimetric techniques which provide major improvements over other calorimeters. Improvements are in the areas of greater precision, reduced maintenance, and thermal control without using water. The elimination of water reduces criticality concerns during assay of fissionable materials and reduces health concerns during assay of tritium. Equipment Engineering Section has developed two basic dry calorimeter designs. The designs are identical in concept; however, they differ to accommodate different power levels. Each design has been tested demonstrating proof of concept. The current designs are for low wattage samples, .1 to 10 watts, and high wattage samples, 40 to 140 watts.

  16. Dry calorimetry at the Savannah River Site

    SciTech Connect (OSTI)

    ReFalo, L.A.

    1992-04-01

    Heat flow calorimeters are used at the Savannah River Site to assay radioactive sources by measuring the emitted thermal power. The radioactive source is placed in a constant temperature environment and its thermal output is measured by non-destructive assay techniques. The isotopic mass is computed from the measured power through known watts/gram constants for each of the isotopes. The Equipment Engineering Section of the Savannah River Laboratory has developed calorimetric techniques which provide major improvements over other calorimeters. Improvements are in the areas of greater precision, reduced maintenance, and thermal control without using water. The elimination of water reduces criticality concerns during assay of fissionable materials and reduces health concerns during assay of tritium. Equipment Engineering Section has developed two basic dry calorimeter designs. The designs are identical in concept; however, they differ to accommodate different power levels. Each design has been tested demonstrating proof of concept. The current designs are for low wattage samples, .1 to 10 watts, and high wattage samples, 40 to 140 watts.

  17. Hood River Passive House

    SciTech Connect (OSTI)

    Hales, D.

    2014-01-01

    The Hood River Passive Project was developed by Root Design Build of Hood River Oregon using the Passive House Planning Package (PHPP) to meet all of the requirements for certification under the European Passive House standards. The Passive House design approach has been gaining momentum among residential designers for custom homes and BEopt modeling indicates that these designs may actually exceed the goal of the U.S. Department of Energy's (DOE) Building America program to reduce home energy use by 30%-50% (compared to 2009 energy codes for new homes). This report documents the short term test results of the Shift House and compares the results of PHPP and BEopt modeling of the project. The design includes high R-Value assemblies, extremely tight construction, high performance doors and windows, solar thermal DHW, heat recovery ventilation, moveable external shutters and a high performance ductless mini-split heat pump. Cost analysis indicates that many of the measures implemented in this project did not meet the BA standard for cost neutrality. The ductless mini-split heat pump, lighting and advanced air leakage control were the most cost effective measures. The future challenge will be to value engineer the performance levels indicated here in modeling using production based practices at a significantly lower cost.

  18. Hood River Passive House

    SciTech Connect (OSTI)

    Hales, David

    2014-01-01

    The Hood River Passive Project was developed by Root Design Build of Hood River Oregon using the Passive House Planning Package (PHPP) to meet all of the requirements for certification under the European Passive House standards. The Passive House design approach has been gaining momentum among residential designers for custom homes and BEopt modeling indicates that these designs may actually exceed the goal of the U.S. Department of Energy's (DOE) Building America program to "reduce home energy use by 30%-50% (compared to 2009 energy codes for new homes). This report documents the short term test results of the Shift House and compares the results of PHPP and BEopt modeling of the project. The design includes high R-Value assemblies, extremely tight construction, high performance doors and windows, solar thermal DHW, heat recovery ventilation, moveable external shutters and a high performance ductless mini-split heat pump. Cost analysis indicates that many of the measures implemented in this project did not meet the BA standard for cost neutrality. The ductless mini-split heat pump, lighting and advanced air leakage control were the most cost effective measures. The future challenge will be to value engineer the performance levels indicated here in modeling using production based practices at a significantly lower cost.

  19. Wild and Scenic Rivers | Open Energy Information

    Open Energy Info (EERE)

    Scenic Rivers Jump to: navigation, search Retrieved from "http:en.openei.orgwindex.php?titleWildandScenicRivers&oldid612228" Feedback Contact needs updating Image...

  20. Green River Biodiesel Incorporated | Open Energy Information

    Open Energy Info (EERE)

    River Biodiesel Incorporated Jump to: navigation, search Name: Green River Biodiesel Incorporated Place: Houston, Texas Zip: 77056 Product: Biodiesel project developer and...

  1. Independent Activity Report, Savannah River Remediation - July...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Independent Activity Report, Savannah River Remediation - July 2010 July 2010 Savannah River Operations Office Integrated Safety Management System Phase II Verification Review of ...

  2. Independent Oversight Inspection, Savannah River Site Office...

    Energy Savers [EERE]

    Office - December 2009 Independent Oversight Inspection, Savannah River Site Office - December 2009 December 2009 Inspection of Nuclear Safety at the Savannah River Site Office and ...

  3. Savannah River Remediation (SRR) Expanded Staff Meeting

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Savannah River Remediation Delivering the Mission Dave Olson President and Project Manager ... Liquid Waste Operations contractor Savannah River Remediation LLC * Began work in ...

  4. Beasley Lab | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    These studies are being conducted in habitats on the Savannah River Site where the ... activities on the Savannah River Site can expose wildlife that use contaminated areas. ...

  5. Savannah River Analytical Laboratories Achieve International...

    National Nuclear Security Administration (NNSA)

    Savannah River Analytical Laboratories Achieve International Standard Accreditation Tuesday, September 8, 2015 - 12:55pm Savannah River National Laboratory's FH Analytical ...

  6. Educational Materials | Savannah River Ecology Laboratory Environmenta...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Research Snapshots The Savannah River Site National Environmental Research Park The History of Radioecology Research at the Savannah River Ecology Laboratory Gray Foxes of the ...

  7. Savannah river site | National Nuclear Security Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Savannah river site NNSA team members make a living in nuclear security, make a difference ... Last HEU Removed from Switzerland under NNSA Collaboration Savannah River Analytical ...

  8. Independent Oversight Inspection, Savannah River Site - January...

    Energy Savers [EERE]

    Independent Oversight Inspection, Savannah River Site - January 2010 January 2010 Inspection of Emergency Management at the Savannah River Site This report provides the results of ...

  9. Flambeau River Biofuels Demonstration-Scale Biorefinery

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    in Wisconsin (NewPage Corporation in Wisconsin Rapids and Flambeau River Papers, LLC in Park Falls). NewPage and Flambeau River have demonstrated successful collaboration on...

  10. Grand River Dam Authority | Open Energy Information

    Open Energy Info (EERE)

    River Dam Authority Place: Oklahoma Phone Number: 918-256-5545 Website: www.grda.com Twitter: @okgrda Facebook: https:www.facebook.compagesGrand-River-Dam-Authority...

  11. Beijing Haohua Rivers International Water Engineering Consulting...

    Open Energy Info (EERE)

    Haohua Rivers International Water Engineering Consulting Co Ltd Jump to: navigation, search Name: Beijing Haohua Rivers International Water Engineering Consulting Co.Ltd. Place:...

  12. River Hydrokinetic Resource Atlas | Open Energy Information

    Open Energy Info (EERE)

    dress":"","icon":"","group":"","inlineLabel":"","visitedicon":"" Hide Map Language: English River Hydrokinetic Resource Atlas Screenshot References: EPRI1 River Atlas2 The...

  13. Independent Oversight Activity Report, Savannah River Site -...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - February 2014 Independent Oversight Activity Report, Savannah River Site - February 2014 February 2014 Operational Awareness Visit of the Savannah River Site...

  14. Withlacoochee River Elec Coop | Open Energy Information

    Open Energy Info (EERE)

    Withlacoochee River Elec Coop Jump to: navigation, search Name: Withlacoochee River Elec Coop Place: Florida Phone Number: 352-567-5133 Website: www.wrec.net Twitter: https:...

  15. Categorical Exclusion Determinations: Savannah River Operations...

    Office of Environmental Management (EM)

    Savannah River Operations Office Categorical Exclusion Determinations: Savannah River ... Install Concrete Block Bins for Additional Rock Storage at MOX Batch Plant CX(s) Applied: ...

  16. Savannah River Remediation, College Create Job Opportunities...

    Office of Environmental Management (EM)

    Remediation, College Create Job Opportunities for Graduates Savannah River Remediation, ... "With ongoing missions at the Savannah River Site and construction at Plant Vogtle and ...

  17. Kings River Conservation Dist | Open Energy Information

    Open Energy Info (EERE)

    Kings River Conservation Dist Jump to: navigation, search Name: Kings River Conservation Dist Place: California Phone Number: 559-237-5567 Website: www.krcd.org Facebook: https:...

  18. Voluntary Protection Program Onsite Review, Washington River...

    Energy Savers [EERE]

    Washington River Protection Solutions, LLC, Hanford - Feb 2014 Voluntary Protection Program Onsite Review, Washington River Protection Solutions, LLC, Hanford - Feb 2014 February...

  19. Enforcement Letter, Westinghouse Savannah River Company- April 19, 2004

    Broader source: Energy.gov [DOE]

    Issued to Westinghouse Savannah River Company related to Employee Reprisal at the Savannah River Site

  20. Enforcement Letter, Westinghouse Savannah River Company- November 14, 2003

    Broader source: Energy.gov [DOE]

    Issued to Westinghouse Savannah River Company related to Criticality Safety Violations at the Savannah River Site

  1. Seasonal Juvenile Salmonid Presence and Migratory Behavior in the Lower Columbia River

    SciTech Connect (OSTI)

    Carter, Jessica A.; McMichael, Geoffrey A.; Welch, Ian D.; Harnish, Ryan A.; Bellgraph, Brian J.

    2009-04-30

    To facilitate preparing Biological Assessments of proposed channel maintenance projects, the Portland District of the U.S. Army Corps of Engineers contracted the Pacific Northwest National Laboratory to consolidate and synthesize available information about the use of the lower Columbia River and estuary by juvenile anadromous salmonids. The information to be synthesized included existing published documents as well as data from five years (2004-2008) of acoustic telemetry studies conducted in the Columbia River estuary using the Juvenile Salmon Acoustic Telemetry System. For this synthesis, the Columbia River estuary includes the section of the Columbia River from Bonneville Dam at river kilometer (Rkm) 235 downstream to the mouth where it enters the Pacific Ocean. In this report, we summarize the seasonal salmonid presence and migration patterns in the Columbia River estuary based on information from published studies as well as relevant data from acoustic telemetry studies conducted by NOAA Fisheries and the Pacific Northwest National Laboratory (PNNL) between 2004 and 2008. Recent acoustic telemetry studies, conducted using the Juvenile Salmon Acoustic Telemetry System (JSATS; developed by the Portland District of the U.S. Army Corps of Engineers), provided information on the migratory behavior of juvenile steelhead (O. mykiss) and Chinook salmon in the Columbia River from Bonneville Dam to the Pacific Ocean. In this report, Section 2 provides a summary of information from published literature on the seasonal presence and migratory behavior of juvenile salmonids in the Columbia River estuary and plume. Section 3 presents a detailed synthesis of juvenile Chinook salmon and steelhead migratory behavior based on use of the JSATS between 2004 and 2008. Section 4 provides a discussion of the information summarized in the report as well as information drawn from literature reviews on potential effects of channel maintenance activities to juvenile salmonids rearing in or migrating through the Columbia River estuary and plume.

  2. Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2.The section of Field 3-409 contained within this Set-Aside has undergone plant community succession from an herbaceous old-field in 1951 to a present day pine forest habitat. ...

  3. The Savannah River site`s groundwater monitoring program: second quarter 1997

    SciTech Connect (OSTI)

    Rogers, C.D.

    1997-11-01

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site`s (SRS) Groundwater Monitoring Program. During second quarter 1997, EPD/EMS conducted extensive sampling of monitoring wells. A detailed explanation of the flagging criteria is presented in the Flagging Criteria section of this document. Analytical results from second quarter 1997 are included in this report.

  4. Section L, Paragraph L-4

    National Nuclear Security Administration (NNSA)

    D SECTION L ATTACHMENT D CROSS REFERENCE MATRIX Section L Section M Offeror's Proposal Criterion 1: PAST PERFORMANCE L-15 (a) M-3 (a) Criterion 2: SITE ORGANIZATION AND QUALIFICATIONS OF KEY PERSONNEL L-15 (b)(1) M-3 (b)(1) L-15 (b)(2) M-3 (b)(2) Criterion 3: SMALL BUSINESS PARTICIPATION L-15 (c) M-3 (c)

  5. Concept Paper Savannah River Nuclear Solutions, LLC Savannah River Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Paper Savannah River Nuclear Solutions, LLC Savannah River Site Aiken, SC 29808 Michael S. Navetta, PE Manager- Energy Park Initiative (803) 952-8806 michael.navetta@srs.gov U.S. EnergyFreedomCenter PREDECISIONAL DRAFT Today We Can Start To Unshackle America Decades of debate for ending America's dependence on foreign fossil fuels, climate change and environmentally positive energy has produced a myriad of technologies that independently offer a partial solution. Applying existing technologies

  6. about Savannah River National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    In an effort to ensure the safety of the nation's nuclear weapons stockpile, the Savannah ... Operated by Savannah River Nuclear Solutions for the U.S. Department of Energy near Aiken, ...

  7. Raft River Idaho Magnetotelluric Data

    SciTech Connect (OSTI)

    Gregory Nash

    2015-05-13

    Raw magnetotelluric (MT) data covering the geothermal system at Raft River, Idaho. The data was acquired by Quantec Geoscience. This is a zipped file containing .edi raw MT data files.

  8. Savannah River Site | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Savannah River Site Savannah River Site Savannah River Site | June 2011 Aerial View Savannah River Site | June 2011 Aerial View Savannah River Site (SRS) has mission responsibilities in nuclear weapons stockpile stewardship by ensuring the safe and reliable management of tritium resources; by contributing to the stockpile surveillance program; and by assisting in the development of alternatives for large-scale pit disassembly/conversion capability. SRS also manages excess nuclear materials and

  9. Savannah River Site | Department of Energy

    Office of Environmental Management (EM)

    Savannah River Site Savannah River Site Savannah River Site | June 2011 Aerial View Savannah River Site | June 2011 Aerial View Savannah River Site (SRS) has mission responsibilities in nuclear weapons stockpile stewardship by ensuring the safe and reliable management of tritium resources; by contributing to the stockpile surveillance program; and by assisting in the development of alternatives for large-scale pit disassembly/conversion capability. SRS also manages excess nuclear materials and

  10. The Savannah River Site's Groundwater Monitoring Program, third quarter 1989

    SciTech Connect (OSTI)

    Not Available

    1989-01-01

    The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site's Groundwater Monitoring Program. During third quarter 1989 (July--September), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead they aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the third quarter is presented in the Flagging Criteria section of this document. All analytical results from third quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

  11. The Savannah River Site's Groundwater Monitoring Program, first quarter 1989

    SciTech Connect (OSTI)

    Not Available

    1989-01-01

    The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site's Groundwater Monitoring Program. During first quarter 1989 (January--March), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the first quarter is presented in the Flagging Criteria section of this document. All analytical results from first quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

  12. The Savannah River Site's Groundwater Monitoring Program, second quarter 1989

    SciTech Connect (OSTI)

    Not Available

    1989-01-01

    The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site's Groundwater Monitoring Program. During second quarter 1989 (April--June), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the second quarter is presented in the Flagging Criteria section of this document. All analytical results from second quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

  13. Dayao County Yupao River BasDayao County Yupao River Basin Hydro...

    Open Energy Info (EERE)

    Dayao County Yupao River BasDayao County Yupao River Basin Hydro electricity Development Co Ltd in Jump to: navigation, search Name: Dayao County Yupao River BasDayao County Yupao...

  14. Flow and Transport in the Hanford 300 Area Vadose Zone-Aquifer-River System

    SciTech Connect (OSTI)

    Waichler, Scott R.; Yabusaki, Steven B.

    2005-07-13

    Contaminant migration in the 300 Area unconfined aquifer is strongly coupled to fluctuations in the Columbia River stage. To better understand the interaction between the river, aquifer, and vadose zone, a 2-D saturated-unsaturated flow and transport model was developed for a vertical cross-section aligned west-east across the Hanford Site 300 Area, nearly perpendicular to the river. The model was used to investigate water flow and tracer transport in the vadose zone-aquifer-river flow system, in support of the ongoing study of the 300 Area uranium plume. The STOMP simulator was used to model 1-year from 3/1/92 to 2/28/93, a period when hourly data were available for both groundwater and river levels. Net water flow to the river (per 1-meter width of shoreline) was 182 m3/y in the base case, but the cumulative exchange or total flow back and forth across the riverbed was 30 times greater. The low river case had approximately double the net water and Groundwater tracer flux into the river as compared to the base case.

  15. PART III-SECTION J

    National Nuclear Security Administration (NNSA)

    C SECTION J APPENDIX C TRANSITION PLAN Plan: [To be inserted by the Contracting Officer.] Requirements: In accordance with Section F, Deliverables During Transition, the Contractor shall submit a Transition Plan for the Contracting Officer's approval 10 days after Contract award. The Transition plan shall describe the process, details, schedule, and cost for providing an orderly transition during the Contract's Transition Term stated in Section F, F-3 Period of Performance. The Transition Plan

  16. NAABB Full Final Report Section I

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    REPORT SECTION I FULL FINAL REPORT SECTION I FULL FINAL REPORT SECTION I Program Overview Table of Contents Executive Summary ......

  17. PP-366 Twin Rivers Paper Company, Inc. | Department of Energy

    Office of Environmental Management (EM)

    6 Twin Rivers Paper Company, Inc. PP-366 Twin Rivers Paper Company, Inc. Presidential Permit authorizing Twin Rivers Paper Company, Inc. to construct, operate, and maintain ...

  18. BLM Humboldt River Field Office | Open Energy Information

    Open Energy Info (EERE)

    River Field Office Jump to: navigation, search Name: BLM Humboldt River Field Office Abbreviation: Humboldt River Address: 5100 E. Winnemucca Blvd. Place: Winnemucca, Nevada Zip:...

  19. EA-273 Rainy River Energy Corporation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rainy River Energy Corporation EA-273 Rainy River Energy Corporation Order authorizing Rainy River Energy Corporation to export electric energy to Canada. PDF icon EA-273 Rainy ...

  20. PIA - Savannah River Operations Office File and Print Services...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    File and Print Services PIA - Savannah River Operations Office File and Print Services PIA - Savannah River Operations Office File and Print Services PDF icon PIA - Savannah River ...

  1. PIA - DOE Savannah River Operations Office PRISM System | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Savannah River Operations Office PRISM System PIA - DOE Savannah River Operations Office PRISM System PIA - DOE Savannah River Operations Office PRISM System PDF icon PIA - DOE ...

  2. Voluntary Protection Program Onsite Review, Savannah River Remediation...

    Office of Environmental Management (EM)

    River Remediation, Llc, Liquid Waste Contract, Savannah River Site - November 2014 Voluntary Protection Program Onsite Review, Savannah River Remediation, Llc, Liquid Waste ...

  3. Savannah River Site - L-Area Southern Groundwater | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    L-Area Southern Groundwater Savannah River Site - L-Area Southern Groundwater January 1, ... InstallationName, State: Savannah River Site, SC Responsible DOE Office: Savannah River ...

  4. Independent Activity Report, Savannah River Site - March 2013...

    Office of Environmental Management (EM)

    Savannah River Site - March 2013 Independent Activity Report, Savannah River Site - March 2013 March 2013 Oversight Scheduling an Operational Awareness at the Savannah River Site ...

  5. Savannah River Site - R-Area Groundwater Operable Unit | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    R-Area Groundwater Operable Unit Savannah River Site - R-Area Groundwater Operable Unit ... InstallationName, State: Savannah River Site, SC Responsible DOE Office: Savannah River ...

  6. Snake River Plain Geothermal Region | Open Energy Information

    Open Energy Info (EERE)

    Survey At Snake River Plain Region (DOE GTP) Micro-Earthquake At Snake River Plain Geothermal Region (1976) Reflection Survey At Snake River Plain Region (DOE GTP)...

  7. Independent Oversight Activity Report, Office of River Protection...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office of River Protection - May 2013 Independent Oversight Activity Report, Office of River Protection - May 2013 May 2013 Operational Awareness Visit at the Office of River...

  8. Savannah River National Laboratory (SRNL) | Open Energy Information

    Open Energy Info (EERE)

    (Redirected from Savannah River National Laboratory) Jump to: navigation, search Logo: Savannah River National Laboratory Name: Savannah River National Laboratory Place: Aiken,...

  9. SECTION J, APPENDIX A - SOW

    National Nuclear Security Administration (NNSA)

    0007749 SECTION J, APPENDIX A: STATEMENT OF WORK TABLE OF CONTENTS CHAPTER I. OBJECTIVES, SCOPE, AND REQUIREMENTS ......................................................................... 1 1.0 OBJECTIVE .................................................................................................................................................. 1 2.0 BACKGROUND

  10. PART III … SECTION J

    National Nuclear Security Administration (NNSA)

    B, Page 1 SECTION J APPENDIX B AWARD FEE PLAN [Note: To be inserted by the Contracting Officer after contract award.]

  11. PART III … SECTION J

    National Nuclear Security Administration (NNSA)

    M, Page 1 SECTION J APPENDIX M CONTRACTOR COMMITMENTS, AGREEMENTS, AND UNDERSTANDINGS [Note: To be inserted by the Contracting Officer after contract award.]

  12. The Savannah River Site's Groundwater Monitoring Program

    SciTech Connect (OSTI)

    Not Available

    1991-06-18

    This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted in the fourth quarter of 1990. It includes the analytical data, field data, well activity data, and other documentation for this program, provides a record of the program's activities and rationale, and serves as an official document of the analytical results. The groundwater monitoring program includes the following activities: installation, maintenance, and abandonment of monitoring wells, environmental soil borings, development of the sampling and analytical schedule, collection and analyses of groundwater samples, review of analytical and other data, maintenance of the databases containing groundwater monitoring data, quality assurance (QA) evaluations of laboratory performance, and reports of results to waste-site facility custodians and to the Environmental Protection Section (EPS) of EPD.

  13. River Protection Project (RPP) Environmental Program Plan

    SciTech Connect (OSTI)

    POWELL, P.A.

    2000-03-29

    This Environmental Program Plan was developed in support of the Integrated Environment, Safety, and Health Management System Plan (ISMS) (RPP-MP-003), which establishes a single, defined environmental, safety, and health management system that integrates requirements into the work planning and execution processes to protect workers, the public, and the environment. The ISMS also provides mechanisms for increasing worker involvement in work planning, including hazard and environmental impact identification, analysis, and control; work execution; and feedback/improvement processes. The ISMS plan consists of six core functions. Each section of this plan describes the activities of the River Protection Project (RPP) (formerly known as the Tank Waste Remediation System) Environmental organization according to the following core functions: Establish Environmental Policy; Define the Scope of Work; Identify Hazards, Environmental Impacts, and Requirements; Analyze Hazards and Environmental Impacts and Implement Controls; Perform Work within Controls; and Provide Feedback and Continuous Improvement.

  14. The Savannah River Site's Groundwater Monitoring Program

    SciTech Connect (OSTI)

    Not Available

    1990-10-18

    This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted in the first quarter of 1990. It includes the analytical data, field data, well activity data, and the other documentation for this program and provides a record of the program's activities and rationale and an official document of the analytical results. The groundwater monitoring program includes the following activities: installation, maintenance, and abandonment of monitoring wells, environmental soil borings, development of the sampling and analytical schedule, collection and analyses of groundwater samples, review of the analytical data and other data, maintenance of the databases containing groundwater monitoring data and related data, quality assurance (QA) evaluations of laboratory performance, and reports of results to waste-site facility custodians and to the Environmental Protection Section (EPS) of EPD.

  15. Grande Ronde Basin Supplementation Program; Lostine River, 2000 Annual Report.

    SciTech Connect (OSTI)

    Onjukka, Sam T.; Harbeck, Jim

    2003-03-01

    The Northwest Power Planning Council (NPPC) identified supplementation as a high priority to achieve its goal of increasing runs of anadromous fish in the Columbia Basin. Supplementation activities in the Lostine River and associated monitoring and evaluation conducted by the Nez Perce Tribe relate directly to the needs addressed in the Columbia River Basin Fish and Wildlife Program (NPPC 1994). Measure 7.4L.1 of the Program mandates that appropriate research accompany any proposed supplementation. In addition, measure 7.3B.2 of the Program stresses the need for evaluating supplementation projects to assess their ability to increase production. Finally, Section 7.4D.3 encourages the study of hatchery rearing and release strategies to improve survival and adaptation of cultured fish. In 1997, Oregon Department of Fisheries and Wildlife (ODFW) requested a modification of Permit 1011 to allow the take of adult spring chinook salmon. In 1998, the Nez Perce Tribe also requested a permit specific to activities on Lostine River. The permit was issued in 2000. A special condition in the permits required the development of a long term management plan for the spring chinook salmon of the Grande Ronde Basin. The Nez Perce Tribe, ODFW, and the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) completed a formal long range plan entitled ''Grande Ronde Basin Endemic Spring Chinook Salmon Supplementation Program''. The program proposes to increase the survival of spring chinook salmon in the Grand Ronde Basin through hatchery intervention. Adult salmon from the Lostine River, Catherine Creek, and the Upper Grande Ronde River are used for a conventional supplementation program in the basin. The Nez Perce program currently operates under the ESA Section 10 Permit 1149.

  16. Grande Ronde Basin Supplementation Program; Lostine River, 2001 Annual Report.

    SciTech Connect (OSTI)

    Onjukka, Sam T.; Harbeck, Jim

    2003-03-01

    The Northwest Power Planning Council (NPPC) identified supplementation as a high priority to achieve its goal of increasing runs of anadromous fish in the Columbia Basin. Supplementation activities in the Lostine River and associated monitoring and evaluation conducted by the Nez Perce Tribe relate directly to the needs addressed in the Columbia River Basin Fish and Wildlife Program (NPPC 1994). Measure 7.4L.1 of the Program mandates that appropriate research accompany any proposed supplementation. In addition, measure 7.3B.2 of the Program stresses the need for evaluating supplementation projects to assess their ability to increase production. Finally, Section 7.4D.3 encourages the study of hatchery rearing and release strategies to improve survival and adaptation of cultured fish. In 1997, Oregon Department of Fisheries and Wildlife (ODFW) requested a modification of Permit 1011 to allow the take of adult spring chinook salmon. In 1998, the Nez Perce Tribe also requested a permit specific to activities on Lostine River. The permit was issued in 2000. A special condition in the permits required the development of a long term management plan for the spring chinook salmon of the Grande Ronde Basin. The Nez Perce Tribe, ODFW, and the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) completed a formal long range plan entitled ''Grande Ronde Basin Endemic Spring Chinook Salmon Supplementation Program''. The program proposes to increase the survival of spring chinook salmon in the Grand Ronde Basin through hatchery intervention. Adult salmon from the Lostine River, Catherine Creek, and the Upper Grande Ronde River are used for a conventional supplementation program in the basin. The Nez Perce program currently operates under the ESA Section 10 Permit 1149.

  17. SRS FTF Section 3116 Determination signed by Secretary Chu | Department of

    Office of Environmental Management (EM)

    Basis for Determination SRS FTF Section 3116 Basis for Determination Basis for Section 3116 Determination for Closure of F-Tank Farm at the Savannah River Site. In accordance with NDAA Section 3116, certain waste from reprocessing of spent nuclear fuel is not high-level waste if the Secretary of Energy, in consultation with the NRC, determines that the criteria in NDAA Section 3116(a) are met. This FTF 3116 Basis Document shows that those criteria are satisfied, to support a determination that

  18. Green River, Utah, Disposal Site Fact Sheet

    Office of Legacy Management (LM)

    Green River, Utah, Disposal Site This fact sheet provides information about the Uranium Mill Tailings Radiation Control Act of 1978 Title I disposal site near Green River, Utah. This site is managed by the U.S. Department of Energy Office of Legacy Management. Location of the Green River, Utah, Disposal Site Site Description and History The Green River disposal site is about 0.5 mile east of the Green River and 1.5 miles southeast of the city of Green River, Utah. The site consists of an

  19. S ENERGY POLICY ACT OF 2005 SECTION 242 HYDROELECTRIC INCENTIVE PROGRAM

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    S ENERGY POLICY ACT OF 2005 SECTION 242 HYDROELECTRIC INCENTIVE PROGRAM CALENDAR YEAR 2013 INCENTIVE PAYMENTS Payee (Applicant) Hydro Facility Albany Engineering Corporation (AEC) Mechanicville Hydroelectric Project Albany Engineering Corporation (AEC) Stuyvesant Falls Hydroelectric Project Barton (VT) Village, Inc., Electric Department Barton Hydro Bell Mountain Hydro LLC Bell Mountain Hydro Facility Bowersock Mills & Power Company Expanded Kansas River Hydropower Project-North Powerhouse

  20. Savannah River Site Approved Site Treatment Plan, 1998 Annual Update

    SciTech Connect (OSTI)

    Lawrence, B.; Berry, M.

    1998-03-01

    The U.S. Department of Energy, Savannah River Operations Office (DOE- SR),has prepared the Site Treatment Plan (STP) for Savannah River Site (SRS) mixed wastes in accordance with RCRA Section 3021(b), and SCDHEC has approved the STP (except for certain offsite wastes) and issued an order enforcing the STP commitments in Volume I. DOE-SR and SCDHEC agree that this STP fulfills the requirements contained in the FFCAct, RCRA Section 3021, and therefore,pursuant to Section 105(a) of the FFCAct (RCRA Section 3021(b)(5)), DOE`s requirements are to implement the plan for the development of treatment capacities and technologies pursuant to RCRA Section 3021.Emerging and new technologies not yet considered may be identified to manage waste more safely, effectively, and at lower cost than technologies currently identified in the plan. DOE will continue to evaluate and develop technologies that offer potential advantages in public acceptance, privatization, consolidation, risk abatement, performance, and life-cycle cost. Should technologies that offer such advantages be identified, DOE may request a revision/modification of the STP in accordance with the provisions of Consent Order 95-22-HW.The Compliance Plan Volume (Volume I) identifies project activity schedule milestones for achieving compliance with Land Disposal Restrictions (LDR). Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume (Volume II) and is provided for information.

  1. THE SNAKE RIVER PLAIN AQUIFER THE SNAKE RIVER PLAIN AQUIFER

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    aquifer THE INL & THE SNAKE RIVER PLAIN AQUIFER THE SNAKE RIVER PLAIN AQUIFER underneath the Idaho National Laboratory is one of the most productive groundwater resources in the U.S. Each year about 2 million acre-feet of water is drawn from the aquifer. Approximately 95 percent of the water withdrawn from the aquifer is used for irrigation, 3 per- cent for domestic water, and 2 percent for industrial purposes. The aquifer is the primary water source for more than 280,000 people in

  2. Concept Paper Savannah River Nuclear Solutions, LLC Savannah River Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Paper Savannah River Nuclear Solutions, LLC Savannah River Site Aiken, SC 29808 Michael S. Navetta, PE Manager- Energy Park Initiative (803) 952-8806 michael.navetta@srs.gov DRAFT Small Modular Reactor Demonstration Complex "One of the most promising areas is small modular reactors (SMRs). If we can develop this technology in the U.S. and build these reactors with American workers, we will have a key competitive edge. Our choice is clear: Develop these technologies today or import them

  3. Test plan for the M-100 container, (model M-101/7A/12/90) docket 96-43-7A, type A container. Revision 1

    SciTech Connect (OSTI)

    Kelly, D.L.

    1997-07-22

    This report concerns the packaging configurations being tested by the U.S. DOE and its contractors, and according to U.S. DOT specification 7A Type A (DOT-7A) requirements. The objective of this Test Plan is to describe the testing for the qualification of the M-100 Container, Model M-101/7A/12/90 as a DOT-7A Type A packaging. This packaging system is designed to ship Type A solid radioactive materials, normal form, Form Number 1, Form Number 2, and Form Number 3.

  4. Flambeau_River_Biofuels.pdf | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FlambeauRiverBiofuels.pdf FlambeauRiverBiofuels.pdf FlambeauRiverBiofuels.pdf PDF icon FlambeauRiverBiofuels.pdf More Documents & Publications Pacific Ethanol, Inc Flambeau ...

  5. Grays River Watershed Geomorphic Analysis

    SciTech Connect (OSTI)

    Geist, David R.

    2005-04-30

    This investigation, completed for the Pacific Northwest National Laboratory (PNNL), is part of the Grays River Watershed and Biological Assessment commissioned by Bonneville Power Administration under project number 2003-013-00 to assess impacts on salmon habitat in the upper Grays River watershed and present recommendations for habitat improvement. This report presents the findings of the geomorphic assessment and is intended to support the overall PNNL project by evaluating the following: 􀂃 The effects of historical and current land use practices on erosion and sedimentation within the channel network 􀂃 The ways in which these effects have influenced the sediment budget of the upper watershed 􀂃 The resulting responses in the main stem Grays River upstream of State Highway 4 􀂃 The past and future implications for salmon habi

  6. Supplement Number 1 to Operating Plan of Mirnat Potomac River, LLC in

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Compliance with Order No. 202-05-03 | Department of Energy 1 to Operating Plan of Mirnat Potomac River, LLC in Compliance with Order No. 202-05-03 Supplement Number 1 to Operating Plan of Mirnat Potomac River, LLC in Compliance with Order No. 202-05-03 Docket No. EO-05-01: Pursuant to Section 202(c) of the Federal Power Act, 16 USC §824a(c), Section 301 (b) of the Department of Energy Organization Act, 42 USC §7151 (b), and Order No. 202-05-3, issued by the Department of Energy

  7. Supplement Number 5 to the Operating Plan of Mirant Potomac River, LLC in

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Compliance with Order No. 202-05-03 | Department of Energy 5 to the Operating Plan of Mirant Potomac River, LLC in Compliance with Order No. 202-05-03 Supplement Number 5 to the Operating Plan of Mirant Potomac River, LLC in Compliance with Order No. 202-05-03 Docket No. EO-05-01: Pursuant to Section 202(c) of the Federal Power Act, 16 USC §824a(c), Section 301(b) of the Department of Energy Organization Act, 42 USC §7151(b), and Order No. 202-05-3, issued by the Department of Energy

  8. Platte River Power Authority | Open Energy Information

    Open Energy Info (EERE)

    search Name: Platte River Power Authority Place: Colorado Website: www.prpa.org Facebook: https:www.facebook.comPlatteRiverPower Outage Hotline: 1-888-748-5113 References:...

  9. Savannah River Site | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Savannah River Site NNSA operates facilities at the Savannah River Site (SRS) to supply and process tritium, a radioactive form of hydrogen that is a vital component of nuclear ...

  10. Beasley Lab | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AND DISEASE DYNAMICS OF WILD PIGS ON THE SAVANNAH RIVER SITE SREL Collaborators: Jim ... At the Savannah River Site alone between 30 and 40 pigs are struck by vehicles each year, ...

  11. Research | Savannah River National Environmental Park

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Over the years research on the Savannah River NERP has provided many insights into human ... research on the SRS and the establishment of the Savannah River Ecology Laboratory (SREL). ...

  12. Savannah River Site - TNX | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Savannah River Site - TNX January 1, 2013 - 12:00pm Addthis US Department of Energy Groundwater Database Groundwater Master Report InstallationName, State: Savannah River Site, SC ...

  13. Overview | Savannah River National Environmental Park

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Park Overview The Savannah River Site is an 803-km2 Department of Energy (DOE) facility ... of South Carolina, near Aiken, SC. The site is bordered on one side by the Savannah River. ...

  14. New Savannah River Site Deputy Manager Named

    Broader source: Energy.gov [DOE]

    AIKEN, S.C. – DOE’s Savannah River Operations Office selected Terrel “Terry” J. Spears as the deputy manager of the Savannah River Site (SRS) this month.

  15. Preliminary Notice of Violation, Westinghouse Savannah River...

    Broader source: Energy.gov (indexed) [DOE]

    River Company - EA-97-11 Preliminary Notice of Violation, Westinghouse Savannah River Company - EA 98-09 Preliminary Notice of Violation, Kaiser-Hill Company, LLC - EA-1999-06...

  16. An Inside Look at River Corridor

    Broader source: Energy.gov [DOE]

    In the seventh chapter of The Handford Story, the Energy Department takes a look at the River Corridor -- a 50-mile stretch of the Columbia River that flows through the Hanford site in southeast...

  17. Red River Biodiesel Ltd | Open Energy Information

    Open Energy Info (EERE)

    Ltd Jump to: navigation, search Name: Red River Biodiesel, Ltd. Place: Houston, Texas Zip: 77006 Product: Red River operates a biodiesel plant in Houstion, Texas with a capacity of...

  18. Conceptual Model At Raft River Geothermal Area (1988) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Conceptual Model At Raft River Geothermal Area (1988) Exploration Activity Details Location Raft River...

  19. Conceptual Model At Raft River Geothermal Area (1977) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Conceptual Model At Raft River Geothermal Area (1977) Exploration Activity Details Location Raft River...

  20. Field Mapping At Raft River Geothermal Area (1977) | Open Energy...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Field Mapping At Raft River Geothermal Area (1977) Exploration Activity Details Location Raft River...

  1. Geophysical Method At Raft River Geothermal Area (1975) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geophysical Method At Raft River Geothermal Area (1975) Exploration Activity Details Location Raft River...

  2. Field Mapping At Raft River Geothermal Area (1980) | Open Energy...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Field Mapping At Raft River Geothermal Area (1980) Exploration Activity Details Location Raft River...

  3. Microearthquake surveys of Snake River plain and Northwest Basin...

    Open Energy Info (EERE)

    microearthquakes; Nevada; North America; passive systems; Pershing County Nevada; Raft River; reservoir rocks; seismic methods; seismicity; seismology; Snake River plain;...

  4. Core Analysis At Raft River Geothermal Area (1981) | Open Energy...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Core Analysis At Raft River Geothermal Area (1981) Exploration Activity Details Location Raft River...

  5. Field Mapping At Raft River Geothermal Area (1990) | Open Energy...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Field Mapping At Raft River Geothermal Area (1990) Exploration Activity Details Location Raft River...

  6. Conceptual Model At Raft River Geothermal Area (1987) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Conceptual Model At Raft River Geothermal Area (1987) Exploration Activity Details Location Raft River...

  7. Conceptual Model At Raft River Geothermal Area (1990) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Conceptual Model At Raft River Geothermal Area (1990) Exploration Activity Details Location Raft River...

  8. Conceptual Model At Raft River Geothermal Area (1983) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Conceptual Model At Raft River Geothermal Area (1983) Exploration Activity Details Location Raft River...

  9. Aeromagnetic Survey At Raft River Geothermal Area (1981) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Aeromagnetic Survey At Raft River Geothermal Area (1981) Exploration Activity Details Location Raft River...

  10. Core Analysis At Raft River Geothermal Area (1976) | Open Energy...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Core Analysis At Raft River Geothermal Area (1976) Exploration Activity Details Location Raft River...

  11. Geophysical Method At Raft River Geothermal Area (1977) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geophysical Method At Raft River Geothermal Area (1977) Exploration Activity Details Location Raft River...

  12. Exploratory Well At Raft River Geothermal Area (1977) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Exploratory Well At Raft River Geothermal Area (1977) Exploration Activity Details Location Raft River...

  13. Exploratory Well At Raft River Geothermal Area (1975) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Exploratory Well At Raft River Geothermal Area (1975) Exploration Activity Details Location Raft River...

  14. Tracer Testing At Raft River Geothermal Area (1983) | Open Energy...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Tracer Testing At Raft River Geothermal Area (1983) Exploration Activity Details Location Raft River...

  15. Aeromagnetic Survey At Raft River Geothermal Area (1978) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Aeromagnetic Survey At Raft River Geothermal Area (1978) Exploration Activity Details Location Raft River...

  16. Enforcement Letter, Savannah River Ecology Laboratory- June 7, 2000

    Broader source: Energy.gov [DOE]

    Issued to Savannah River Ecology Laboratory related to Radioactive Material Control Deficiencies at the Savannah River Site

  17. SECTION M_Evaluation Factors

    National Nuclear Security Administration (NNSA)

    EVALUATION OF PROPOSALS .....................................................................................2 M-2 BASIS FOR CONTRACT AWARD ...................................................................................3 M-3 TECHNICAL AND MANAGEMENT CRITERIA ..........................................................3 M-4 COST CRITERION .............................................................................................................6 Section M, Page 2 M-1 EVALUATION OF PROPOSALS

  18. SECTION J - TABLE OF CONTENTS

    National Nuclear Security Administration (NNSA)

    Conformed to Mod 0108 DE-NA0000622 Section J Page i PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS SECTION J LIST OF APPENDICES TABLE OF CONTENTS Appendix A Statement of Work (Replaced by Mod 002; Modified Mod 016; Replaced Mod 029) Appendix B Performance Evaluation Plan (Replaced by Mods 002, 016, 020, 029, 0084) Appendix C Contractor's Transition Plan Appendix D Sensitive Foreign Nations Control Appendix E Performance Guarantee Agreement(s) Appendix F National Work Breakdown

  19. RFP Section H Clause Templates

    Broader source: Energy.gov [DOE]

    On May 3, 2011, twenty two draft Section H clause templates were distributed for Procurement Director (PD), Head of Contracting Activity (HCA), General Counsel and National Nuclear Security Administration (NNSA) review and comment. All comments received were considered and changes were made as appropriate including the elimination of six clauses. The final version of the sixteen RFP Section H clause templates identified below will be available in STRIPES.

  20. Washington River Protection Solutions - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contracting Washington River Protection Solutions Contracting ORP Contracts and Procurements RL Contracts and Procurements CH2M HILL Plateau Remediation Company Mission Support Alliance Washington Closure Hanford HPM Corporation (HPMC) Wastren Advantage, Inc. Bechtel National, Inc. Washington River Protection Solutions Washington River Protection Solutions Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size Washington River Protection Solutions, LLC logo The operation

  1. Office of River Protection - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Office of River Protection Office of River Protection About ORP ORP Projects & Facilities Newsroom Contracts & Procurements Contact ORP Office of River Protection Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size Registration for 2016 Hanford Cleanup Tours PHOENIX Tanks - Live Now UNITED STATES DEPARTMENT OF ENERGY Office of River Protection The U.S. Department of Energy's (DOE) Hanford Site in southeast Washington State is home to 56 million gallons of

  2. Columbia River Component Data Evaluation Summary Report

    SciTech Connect (OSTI)

    C.S. Cearlock

    2006-08-02

    The purpose of the Columbia River Component Data Compilation and Evaluation task was to compile, review, and evaluate existing information for constituents that may have been released to the Columbia River due to Hanford Site operations. Through this effort an extensive compilation of information pertaining to Hanford Site-related contaminants released to the Columbia River has been completed for almost 965 km of the river.

  3. Publications | Savannah River National Environmental Park

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Savannah River NERP Program Publications The Snakes of the Savannah River Plant with Information about Snakebite Prevention and Treatment. J. Whitfield Gibbons. 1977. SRO-NERP-1. 26 p. [Download PDF] The Reptiles and Amphibians of the Savannah River Plant. J. Whitfield Gibbons and Karen K. Patterson. 1978. SRO-NERP-2. 24p. [Download PDF] The Freshwater Bivalve Mollusca (Unionidae, Sphaeriidae, Corbiculidae) of the Savannah River Plant, South Carolina. Joseph C. Britton and Samuel L. H. Fuller.

  4. 1996 Savannah River Site annual epidemiologic surveillance report

    SciTech Connect (OSTI)

    2000-03-01

    This report provides a summary of epidemiologic surveillance data collected from Savannah River Site from January 1, 1996 through December 31, 1996. The data were collected by a coordinator at Savannah River Site and submitted to the Epidemiologic Surveillance Data Center located at Oak Ridge Institute for Science and Education, where quality control procedures and preliminary data analyses were carried out. The analyses were interpreted and the final report prepared by the DOE Office of Epidemiologic Studies. The information in this report provides highlights of the data analyses conducted on the 1996 data collected from Savannah River Site. The main sections of the report include: work force characteristics; absences due to injury or illness lasting 5 or more consecutive workdays; workplace illnesses, injuries, and deaths that were reportable to the Occupational Safety and Health Administration (''OSHA-recordable'' events); and disabilities and deaths among current workers. The 1996 report includes a new section on time trends that provides comparative information on the health of the work force from 1994 through 1996.

  5. Assessment of the Fishery Improvement Opportunities on the Pend Oreille River, 1988 Annual Report.

    SciTech Connect (OSTI)

    Barber, Michael R.; Willms, Roger A.; Scholz, Allan T.

    1989-10-01

    The purpose of this study is to assess the fishery improvement opportunities on the Box Canyon portion of the Pend Oreille River. This report contains the findings of the first year of the study. Chinook salmon (Oncorhynchus tshawytscha (Walbaum)) and steelhead (Oncorhynchus mykiss (Richardson)) were present in the Pend Oreille River prior to the construction of Grand Coulee Dam. The river also contained native cutthroat trout (Oncorhynchus clarki (Richardson)), bull trout (Salvelinus confluentus (Walbaum)) and mountain whitefish (Prosopium williamsoni (Girard)). Rainbow trout were planted in the river and some grew to lengths in excess of 30 inches. With the construction of Box Canyon Dam, in 1955, the most productive section of the river was inundated. Following the construction of the dam the trout fishery declined and the populations of spiny ray fish and rough fish increased. The objectives of the first year of the study were to determine the relative abundance of each species in the river and sloughs; the population levels in fish in the river and four selected tributaries; fish growth rates; the feeding habits and abundance of preferred prey; the migration patterns; and the total fishing pressure, catch per unit effort, and total harvest by conducting a year-round creel survey. 132 refs.

  6. Bayer Material Science (TRL 1 2 3 System)- River Devices to Recover Energy with Advanced Materials(River DREAM)

    Broader source: Energy.gov [DOE]

    Bayer Material Science (TRL 1 2 3 System) - River Devices to Recover Energy with Advanced Materials(River DREAM)

  7. Savannah River Site: Plutonium Preparation Project (PuPP) at Savannah River

    Energy Savers [EERE]

    Savannah River Site Savannah River Site Savannah River Site | June 2011 Aerial View Savannah River Site | June 2011 Aerial View Savannah River Site (SRS) has mission responsibilities in nuclear weapons stockpile stewardship by ensuring the safe and reliable management of tritium resources; by contributing to the stockpile surveillance program; and by assisting in the development of alternatives for large-scale pit disassembly/conversion capability. SRS also manages excess nuclear materials and

  8. Smith River Rancheria- 2005 Project

    Broader source: Energy.gov [DOE]

    The Smith River Rancheria located just south of the Oregon border, on the coast, knows that developing a power-generation facility is a crucial part of its multifaceted plan for both economic development and reduction of energy costs. The activities associated with this grant will include the basic steps necessary to determine whether a generation facility will, in fact, benefit the tribe.

  9. HANFORD SITE RIVER CORRIDOR CLEANUP

    SciTech Connect (OSTI)

    BAZZELL, K.D.

    2006-02-01

    In 2005, the US Department of Energy (DOE) launched the third generation of closure contracts, including the River Corridor Closure (RCC) Contract at Hanford. Over the past decade, significant progress has been made on cleaning up the river shore that bordes Hanford. However, the most important cleanup challenges lie ahead. In March 2005, DOE awarded the Hanford River Corridor Closure Contract to Washington Closure Hanford (WCH), a limited liability company owned by Washington Group International, Bechtel National and CH2M HILL. It is a single-purpose company whose goal is to safely and efficiently accelerate cleanup in the 544 km{sup 2} Hanford river corridor and reduce or eliminate future obligations to DOE for maintaining long-term stewardship over the site. The RCC Contract is a cost-plus-incentive-fee closure contract, which incentivizes the contractor to reduce cost and accelerate the schedule. At $1.9 billion and seven years, WCH has accelerated cleaning up Hanford's river corridor significantly compared to the $3.2 billion and 10 years originally estimated by the US Army Corps of Engineers. Predictable funding is one of the key features of the new contract, with funding set by contract at $183 million in fiscal year (FY) 2006 and peaking at $387 million in FY2012. Another feature of the contract allows for Washington Closure to perform up to 40% of the value of the contract and subcontract the balance. One of the major challenges in the next few years will be to identify and qualify sufficient subcontractors to meet the goal.

  10. METAL MEDIA FILTERS, AG-1 SECTION FI

    SciTech Connect (OSTI)

    Adamson, D.

    2012-05-23

    One application of metal media filters is in various nuclear air cleaning processes including applications for protecting workers, the public and the environment from hazardous and radioactive particles. To support this application the development of the ASME AG-1 FI Standard on Metal Media has been under way for more than ten years. Development of the proposed section has required resolving several difficult issues associated with operating conditions (media velocity, pressure drop, etc.), qualification testing, and quality acceptance testing. Performance characteristics of metal media are dramatically different than the glass fiber media with respect to parameters like differential pressures, operating temperatures, media strength, etc. These differences make existing data for a glass fiber media inadequate for qualifying a metal media filter for AG-1. In the past much work has been conducted on metal media filters at facilities such as Lawrence Livermore National Laboratory (LLNL) and Savannah River National Laboratory (SRNL) to qualify the media as High Efficiency Particulate Air (HEPA) Filters. Particle retention testing has been conducted at Oak Ridge Filter Test Facility and at Air Techniques International (ATI) to prove that the metal media meets or exceeds the 99.97% particle retention required for a HEPA Filter. Even with his testing, data was lacking to complete an AG-1 FI Standard on metal media. With funding secured by Mississippi State University (MSU) from National Nuclear Security Administration (NNSA), a research test stand is being designed and fabricated at MSU's Institute for Clean Energy Technology (ICET) Facility to obtain qualification data on metal media. This in turn will support required data needed for the FI Standard. The paper will discuss in detail how the test stand at MSU will obtain the necessary data to complete the FI Standard.

  11. Savannah River Site generic data base development

    SciTech Connect (OSTI)

    Blanchard , A.

    2000-01-04

    This report describes the results of a project to improve the generic component failure database for the Savannah River Site (SRS). Additionally, guidelines were developed further for more advanced applications of database values. A representative list of components and failure modes for SRS risk models was generated by reviewing existing safety analyses and component failure data bases and from suggestions from SRS safety analysts. Then sources of data or failure rate estimates were identified and reviewed for applicability. A major source of information was the Nuclear Computerized Library for Assessing Reactor Reliability, or NUCLARR. This source includes an extensive collection of failure data and failure rate estimates for commercial nuclear power plants. A recent Idaho National Engineering Laboratory report on failure data from the Idaho Chemical Processing Plant was also reviewed. From these and other recent sources, failure data and failure rate estimates were collected for the components and failure modes of interest. For each component failure mode, this information was aggregated to obtain a recommended generic failure rate distribution (mean and error factor based on a lognormal distribution). Results are presented in a table in this report. A major difference between generic database and previous efforts is that this effort estimates failure rates based on actual data (failure events) rather than on existing failure rate estimates. This effort was successful in that over 75% of the results are now based on actual data. Also included is a section on guidelines for more advanced applications of failure rate data. This report describes the results of a project to improve the generic component failure database for the Savannah River site (SRS). Additionally, guidelines were developed further for more advanced applications of database values.

  12. RFP Section L Attachment Templates

    Broader source: Energy.gov [DOE]

    On March 29,2010, six draft RFP Section L Attachment templates (Past Performance Information Questionnaire, Past Performance Questionnaire Cover Letter, Letter of Commitment, Past Performance Reference Information Form, ESH&Q Past Performance Information Form, and Resume Format) were distributed for Procurement Director (PD) and Head of Contracting Activity (HCA) review and comment. All comments received were considered and changes were made as appropriate. The final versions of the six aforementioned RFP Section L Attachment templates will be e-mailed directly to the Procurement Directors and made available in the STRIPES Library. For RFP's generated in STRIPES, the Section L Attachments should be identified in clause DOE-L-1033 and the file with each Attachment should be attached to the RFP.

  13. Transition section for acoustic waveguides

    DOE Patents [OSTI]

    Karplus, H.H.B.

    1975-10-28

    A means of facilitating the transmission of acoustic waves with minimal reflection between two regions having different specific acoustic impedances is described comprising a region exhibiting a constant product of cross-sectional area and specific acoustic impedance at each cross-sectional plane along the axis of the transition region. A variety of structures that exhibit this feature is disclosed, the preferred embodiment comprising a nested structure of doubly reentrant cones. This structure is useful for monitoring the operation of nuclear reactors in which random acoustic signals are generated in the course of operation.

  14. Neutrino Cross-Section Experiments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    N u F a c t 0 9 11th International Workshop on Neutrino Factories, Superbeams and Beta Beams July 20-25, 2009 - Illinois Institute of Technology - Chicago David Schmitz, Fermilab Outline  Quick Audience Survey  Introduction  Relevant Energies and Targets  Current Cross-Section Experiments  Recent Results and Mysteries  Future Cross-Section Experiments NuFact09 - IIT, Chicago - 07/24/2009 D. Schmitz, Fermilab White Sox Survey D. Schmitz, Fermilab NuFact09 - IIT, Chicago -

  15. Basis for Section 3116 Determination for Salt Waste Disposal at the Savannah River Site

    Office of Environmental Management (EM)

    Fuel and High-Level Waste | Department of Energy Basis for Identification of Disposal Options for R and D for Spent Nuclear Fuel and High-Level Waste Basis for Identification of Disposal Options for R and D for Spent Nuclear Fuel and High-Level Waste The Used Fuel Disposition campaign (UFD) is selecting a set of geologic media for further study that spans a suite of behavior characteristics that impose a broad range of potential conditions on the design of the repository, the engineered

  16. Notice of Availability of Section 3116 Determination for Salt Waste Disposal at the Savannah River Site

    Office of Environmental Management (EM)

    Announcement of Change in Public Meeting Location: Federal Register Notice Volume 78, No. 181 - September 18, 2013 | Department of Energy Northern Pass Transmission Line Project Environmental Impact Statement: Announcement of Change in Public Meeting Location: Federal Register Notice Volume 78, No. 181 - September 18, 2013 Northern Pass Transmission Line Project Environmental Impact Statement: Announcement of Change in Public Meeting Location: Federal Register Notice Volume 78, No. 181 -

  17. SECTION J, APPENDIX A - SOW

    National Nuclear Security Administration (NNSA)

    Mod 002; Modified Mod 016; Replaced Mod 029; Modified Mod 0049) Honeywell FM&T, LLC Contract No. DE-NA0000622 SECTION J APPENDIX A STATEMENT OF WORK 09/19/12 TABLE OF CONTENTS CHAPTER I. OBJECTIVES, SCOPE, AND REQUIREMENTS ......................................................................... 1 1.0 OBJECTIVE .................................................................................................................................................. 1 2.0 BACKGROUND

  18. SECTION M_Evaluation Factors

    National Nuclear Security Administration (NNSA)

    EVALUATION OF PROPOSALS................................................................2 M-2 BASIS FOR CONTRACT AWARD.............................................................3 M-3 TECHNICAL AND MANAGEMENT CRITERIA...........................................3 M-4 COST CRITERION.................................................................................5 Section M, Page 2 M-1 EVALUATION OF PROPOSALS (a) This acquisition will be conducted using the policies and procedures in Federal

  19. SECTION M_Evaluation Factors

    National Nuclear Security Administration (NNSA)

    TABLE OF CONTENTS M-1 EVALUATION OF PROPOSALS......................................................................176 M-2 BASIS FOR CONTRACT AWARD...................................................................177 M-3 TECHNICAL AND MANAGEMENT CRITERIA..........................................177 M-4 COST CRITERION.............................................................................................179 Section M, Page 176 M-1 EVALUATION OF PROPOSALS (a) This acquisition will be

  20. Savannah River Plant/Savannah River Laboratory radiation exposure report

    SciTech Connect (OSTI)

    Rogers, C.D.; Hyman, S.D.; Keisler, L.L. and Co., Aiken, SC . Savannah River Plant); Reeder, D.F.; Jolly, L.; Spoerner, M.T.; Schramm, G.R. and Co., Aiken, SC . Savannah River Lab.)

    1989-01-01

    The protection of worker health and safety is of paramount concern at the Savannah River Site. Since the site is one of the largest nuclear sites in the nation, radiation safety is a key element in the protection program. This report is a compendium of the results in 1988 of the programs at the Savannah River Plant and the Savannah River Laboratory to protect the radiological health of employees. By any measure, the radiation protection performance at this site in 1988 was the best since the beginning of operations. This accomplishment was made possible by the commitment and support at all levels of the organizations to reduce radiation exposures to ALARA (As Low As Reasonably Achievable). The report provides detailed information about the radiation doses received by departments and work groups within these organizations. It also includes exposure data for recent years to allow Plant and Laboratory units to track the effectiveness of their ALARA efforts. Many of the successful practices and methods that reduced radiation exposure are described. A new goal for personnel contamination cases has been established for 1989. Only through continual and innovative efforts to minimize exposures can the goals be met. The radiation protection goals for 1989 and previous years are included in the report. 27 figs., 58 tabs.

  1. The Tritium Under-flow Study at the Savannah River Site

    SciTech Connect (OSTI)

    Hiergesell, Robert A.

    2008-01-15

    An issue of concern at the Savannah River Site (SRS) over the past 20 years is whether tritiated groundwater originating at SRS might be the cause of low levels of tritium measured in certain domestic wells in Georgia. Tritium activity levels in several domestic wells have been observed to occur at levels comparable to what is measured in rainfall in areas surrounding SRS. Since 1988, there has been speculation that tritiated groundwater from SRS could flow under the river and find its way into Georgia wells. A considerable effort was directed at assessing the likelihood of trans-river flow, and 44 wells have been drilled by the USGS and the Georgia Department of Natural Resources. Also, as part of the data collection and analysis, the USGS developed a numerical model during 1997-98 to assess the possibility for such trans-river flow to occur. The model represented the regional groundwater flow system surrounding the Savannah River Site (SRS) in seven layers corresponding to the underlying hydrostratigraphic units, which was regarded as sufficiently detailed to evaluate whether groundwater originating at SRS could possibly flow beneath the Savannah River into Georgia. The model was calibrated against a large database of water-level measurements obtained from wells on both sides of the Savannah River and screened in each of the hydrostratigraphic units represented within the model. The model results verified that the groundwater movement in all hydrostratigraphic units proceeds laterally toward the Savannah River from both South Carolina and Georgia, and discharges into the river. Once the model was calibrated, a particle-track analysis was conducted to delineate areas of potential trans-river flow. Trans-river flow can occur in either an eastward or westward direction. The model indicated that all locations of trans-river flow are restricted to the Savannah River's flood plain, where groundwater passes immediately prior to discharging into the river. Whether the trans-river flow is eastward or westward depends primarily on the position of the Savannah River as it meanders back and forth within the flood plain and is limited to narrow sections of land adjacent to the river. With respect to the only location of westward trans-river flow that has a recharge area within the SRS, the new evaluations of hypothetical pumping scenarios indicated that only a very slight impact is incurred, even under the most extreme groundwater extraction scenario. The updated model did not result in a significant change in the location of the recharge areas at SRS and the only impact was measured in slight changes in the travel times associated with the travel path. The median groundwater travel times for particles released under each of the 4 groundwater extraction scenarios ranged from 366 to 507 years while. Under the most extreme scenario, that under which SRS groundwater extraction is discontinued, the shortest travel time was reduced from 90 to 79 years. It should be emphasized that the groundwater transit times do not include the time required for groundwater to migrate vertically downward across the uppermost aquifer (i.e. at the recharge area), thus the actual groundwater travel times could be up to several decades longer than what was calculated in the model. The exhaustive evaluations that have been conducted indicates that it is highly unlikely that tritiated groundwater originating at the SRS could migrate into Georgia and explain the low tritium activity levels that were originally observed in certain domestic water supply wells. Considering that those wells were located at some distance (several km) from the Savannah River, a far more likely explanation is that tritiated rainfall infiltrated the subsurface and recharged the shallow aquifer within which the well was finished.

  2. Addendum to the Phase 2 Sampling and Analysis Plan for the Clinch River Remedial Investigation

    SciTech Connect (OSTI)

    Not Available

    1994-03-01

    This document is an addendum to the Phase 2 Sampling and Analysis Plan for the Clinch River Remedial Investigation (DOE 1993). The Department of Energy--Oak Ridge Operations (DOE-ORO) is proposing this addendum to the US Envianmental Protection Agency, Region IV (EPA-IV), and the Tennessee Department of Environment and Conservation (TDEC) as a reduced sampling program on the Clinch River arm of Watts Bar Reservoir and on Poplar Creek. DOE-ORO is proposing to maximize the use of existing data and minimize the collection of new data for water, sediment, and biota during Phase 2 of the Clinch River Remedial Investigation. The existing data along with the additional data collected in Phase 2 would be used to perform a baseline risk assessment and make remedial decisions. DOE-ORO considers that the existing data, the additional data collected in Phase 2, and on-site remedial investigation data would be sufficient to understand the nature and extent of the contamination problem in the Clinch River, perform a baseline risk assessment,and make remedial decisions. This addendum is organized in three sections. The first section provides background information and describes a rationale for modifying the Phase 2 Sampling and Analysis Plan. Section 2 presents a summary of the existing data for the Clinch River arm of Watts Bar Reservoir and an evaluation of the sufficiency of this data for a baseline human health and ecological risk assessment. Section 3 describes the revised Phase 2 Sampling and Analysis Plan for surface water, sediment, and biota in the Clinch River OU and in the Poplar Creek OU.

  3. SLUDGE WASHING AND DEMONSTRATION OF THE DWPF FLOWSHEET IN THE SRNL SHIELDED CELLS FOR SLUDGE BATCH 7A QUALIFICATION

    SciTech Connect (OSTI)

    Pareizs, J.; Billings, A.; Click, D.

    2011-07-08

    Waste Solidification Engineering (WSE) has requested that characterization and a radioactive demonstration of the next batch of sludge slurry (Sludge Batch 7a*) be completed in the Shielded Cells Facility of the Savannah River National Laboratory (SRNL) via a Technical Task Request (TTR). This characterization and demonstration, or sludge batch qualification process, is required prior to transfer of the sludge from Tank 51 to the Defense Waste Processing Facility (DWPF) feed tank (Tank 40). The current WSE practice is to prepare sludge batches in Tank 51 by transferring sludge from other tanks. Discharges of nuclear materials from H Canyon are often added to Tank 51 during sludge batch preparation. The sludge is washed and transferred to Tank 40, the current DWPF feed tank. Prior to transfer of Tank 51 to Tank 40, SRNL simulates the Tank Farm and DWPF processes with a Tank 51 sample (referred to as the qualification sample). Sludge Batch 7a (SB7a) is composed of portions of Tanks 4, 7, and 12; the Sludge Batch 6 heel in Tank 51; and a plutonium stream from H Canyon. SRNL received the Tank 51 qualification sample (sample ID HTF-51-10-125) following sludge additions to Tank 51. This report documents: (1) The washing (addition of water to dilute the sludge supernate) and concentration (decanting of supernate) of the SB7a - Tank 51 qualification sample to adjust sodium content and weight percent insoluble solids to Tank Farm projections. (2) The performance of a DWPF Chemical Process Cell (CPC) simulation using the washed Tank 51 sample. The simulation included a Sludge Receipt and Adjustment Tank (SRAT) cycle, where acid was added to the sludge to destroy nitrite and reduce mercury, and a Slurry Mix Evaporator (SME) cycle, where glass frit was added to the sludge in preparation for vitrification. The SME cycle also included replication of five canister decontamination additions and concentrations. Processing parameters were based on work with a non-radioactive simulant. (3) Vitrification of a portion of the SME product and characterization and durability testing (as measured by the Product Consistency Test (PCT)) of the resulting glass. (4) Rheology measurements of the initial slurry samples and samples after each phase of CPC processing. This program was controlled by a Task Technical and Quality Assurance Plan (TTQAP), and analyses were guided by an Analytical Study Plan. This work is Technical Baseline Research and Development (R&D) for the DWPF. It should be noted that much of the data in this document has been published in interoffice memoranda. The intent of this technical report is bring all of the SB7a related data together in a single permanent record and to discuss the overall aspects of SB7a processing.

  4. Qualitative assessment of the impacts of proposed system operating strategies to resident fish within selected Columbia River Reservoirs

    SciTech Connect (OSTI)

    Shreffler, D.K.; Geist, D.R.; Mavros, W.V.

    1994-01-01

    The Bonneville Power Administration (BPA), Bureau of Reclamation (BOR), and US Army Corps of Engineers (COE) are presently conducting the System Operation Review (SOR) for the Columbia River basin. The SOR began in 1990 and is expected to provide an operating strategy that will take into consideration multiple uses of the Columbia River system including navigation, flood control, irrigation, power generation, fish migration, fish and wildlife habitat, recreation, water supply, and water quality. This report provides descriptions of each of the non-modeled reservoirs and other specified river reaches. The descriptions focus on the distinct management goals for resident fish: biodiversity, species-specific concerns, and sport fisheries. In addition, this report provides a qualitative assessment of impacts to the resident fish within these reservoirs and river reaches from the 7 alternative system operating strategies. In addition to this introduction, the report contains four more sections. Section 2.0 provides the methods that were used. Reservoir descriptions appear in Section 3.0, which is a synthesis of our literature review and interviews with resident fish experts. Section 4.0 contains a discussion of potential impacts to fish within each of these reservoirs and river reaches from the 7 proposed system operating strategies. The references cited are listed in Section 5.0.

  5. The Savannah River Site`s Groundwater Monitoring Program, third quarter 1991

    SciTech Connect (OSTI)

    Not Available

    1992-02-17

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site`s (SRS) Groundwater Monitoring Program. During third quarter 1991, EPD/EMS conducted extensive sampling of monitoring wells. Analytical results from third quarter 1991 are listed in this report.

  6. CRAD, Conduct of Operations- Office of River Protection K Basin Sludge Waste System

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a May 2004 assessment of the Conduct of Operations program at the Office of River Protection, K Basin Sludge Waste System.

  7. CRAD, Management- Office of River Protection K Basin Sludge Waste System

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a May 2004 assessment of the Management at the Office of River Protection K Basin Sludge Waste System.

  8. CRAD, Occupational Safety & Health- Office of River Protection K Basin Sludge Waste System

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a May 2004 assessment of the Environment, Safety and Health program at the Office of River Protection K Basin Sludge Waste System.

  9. CRAD, Training- Office of River Protection K Basin Sludge Waste System

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a May 2004 assessment of the Environment, Safety and Health program at the Office of River Protection K Basin Sludge Waste System.

  10. Savannah River Laboratory Decontamination Program

    SciTech Connect (OSTI)

    Rankin, W.N.

    1991-01-01

    Savannah River Laboratory (SRL) has had a Decontamination and Decommissioning (D D) Technology program since 1981. The objective of this program is to provide state-of-the-art technology for use in D D operations that will enable our customers to minimize waste generated and personal exposure, increase productivity and safety, and to minimize the potential for release and uptake of radioactive material. The program identifies and evaluates existing technology, develops new technology, and provides technical assistance to implement its use onsite. This program has impacted not only the Savannah River Site (SRS), but the entire Department of Energy (DOE) complex. To document and communicate the technology generated by this program, 28 papers have been presented at National and International meetings in the United States and Foreign Countries.

  11. Savannah River Laboratory Decontamination Program

    SciTech Connect (OSTI)

    Rankin, W.N.

    1991-12-31

    Savannah River Laboratory (SRL) has had a Decontamination and Decommissioning (D&D) Technology program since 1981. The objective of this program is to provide state-of-the-art technology for use in D&D operations that will enable our customers to minimize waste generated and personal exposure, increase productivity and safety, and to minimize the potential for release and uptake of radioactive material. The program identifies and evaluates existing technology, develops new technology, and provides technical assistance to implement its use onsite. This program has impacted not only the Savannah River Site (SRS), but the entire Department of Energy (DOE) complex. To document and communicate the technology generated by this program, 28 papers have been presented at National and International meetings in the United States and Foreign Countries.

  12. Transverse section radionuclide scanning system

    DOE Patents [OSTI]

    Kuhl, David E.; Edwards, Roy Q.

    1976-01-01

    This invention provides a transverse section radionuclide scanning system for high-sensitivity quantification of brain radioactivity in cross-section picture format in order to permit accurate assessment of regional brain function localized in three-dimensions. High sensitivity crucially depends on overcoming the heretofore known raster type scanning, which requires back and forth detector movement involving dead-time or partial enclosure of the scan field. Accordingly, this invention provides a detector array having no back and forth movement by interlaced detectors that enclose the scan field and rotate as an integral unit around one axis of rotation in a slip ring that continuously transmits the detector data by means of laser emitting diodes, with the advantages that increased amounts of data can be continuously collected, processed and displayed with increased sensitivity according to a suitable computer program.

  13. Raft River geoscience case study

    SciTech Connect (OSTI)

    Dolenc, M.R.; Hull, L.C.; Mizell, S.A.; Russell, B.F.; Skiba, P.A.; Strawn, J.A.; Tullis, J.A.

    1981-11-01

    The Raft River Geothermal Site has been evaluated over the past eight years by the United States Geological Survey and the Idaho National Engineering Laboratory as a moderate-temperature geothermal resource. The geoscience data gathered in the drilling and testing of seven geothermal wells suggest that the Raft River thermal reservoir is: (a) produced from fractures found at the contact metamorphic zone, apparently the base of detached normal faulting from the Bridge and Horse Well Fault zones of the Jim Sage Mountains; (b) anisotropic, with the major axis of hydraulic conductivity coincident to the Bridge Fault Zone; (c) hydraulically connected to the shallow thermal fluid of the Crook and BLM wells based upon both geochemistry and pressure response; (d) controlled by a mixture of diluted meteoric water recharging from the northwest and a saline sodium chloride water entering from the southwest. Although the hydrogeologic environment of the Raft River geothermal area is very complex and unique, it is typical of many Basin and Range systems.

  14. PART III … SECTION J

    National Nuclear Security Administration (NNSA)

    18 Section J Appendix F List of Applicable Laws, Regulations, and DOE Directives In addition to the list of applicable directives referenced below, the Contractor shall also comply with supplementary directives (e.g., manuals), which are invoked by a Contractor Requirements Document (CRD) attached to a directive referenced below. This List excludes directives that have been granted an exemption from the CRD in whole or in part. For those Directives whereby the Contractor has been granted an

  15. Mission Support Contract Section J

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract No. DE-AC06-09RL14728 Modification 298 1 ATTACHMENT J-4-d Mission Support Contract FY 2013 Performance Evaluation and Measurement Plan The Performance Evaluation and Measurement Plan (PEMP) details the administration of performance incentives and allocation of total available fee as defined in Section B, Supplies or Services and Prices/Costs. 1. PERFORMANCE INCENTIVES This PEMP contains both objective and subjective performance incentives in order to maximize the efficacy of the

  16. Columbia River White Sturgeon Genetics and Early Life History: Population Segregation and Juvenile Feeding Behavior, 1987 Final Report.

    SciTech Connect (OSTI)

    Brannon, Ernest L.

    1988-06-01

    The geographic area of the genetics study broadly covered the distribution range of sturgeon in the Columbia from below Bonneville Dam at Ilwaco at Lake Roosevelt, the Upper Snake River, and the Kootenai River. The two remote river sections provided data important for enhancement considerations. There was little electrophoretic variation seen among individuals from the Kootenai River. Upper Snake river sturgeon showed a higher percentage of polymorphic loci than the Kootenai fish, but lower than the other areas in the Columbia River we sampled. Sample size was increased in both Lake Roosevelt and at Electrophoretic variation was specific to an individual sampling area in several cases and this shaped our conclusions. The 1987 early life history studies concentrated on the feeding behavior of juvenile sturgeon. The chemostimulant components in prey attractive to sturgeon were examined, and the sensory systems utilized by foraging sturgeon were determined under different environmental conditions. These results were discussed with regard to the environmental changes that have occurred in the Columbia River. Under present river conditions, the feeding mechanism of sturgeon is more restricted to certain prey types, and their feeding range may be limited. In these situations, enhancement measures cannot be undertaken without consideration given to the introduction of food resources that will be readily available under present conditions. 89 refs., 7 figs., 11 tabs.

  17. The Columbia River System : the Inside Story.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1991-09-01

    The Columbia Ricer is one of the greatest natural resources in the western United States. The river and its tributaries touch the lives of nearly every resident of the Northwest-from providing the world-famous Pacific salmon to supplying the clean natural fuel for over 75 percent of the region's electrical generation. Since early in the century, public and private agencies have labored to capture the benefits of this dynamic river. Today, dozens of major water resource projects throughout the region are fed by the waters of the Columbia Basin river system. And through cooperative efforts, the floods that periodically threaten developments near the river can be controlled. This publication presents a detailed explanation of the planning and operation of the multiple-use dams and reservoirs of the Columbia River system. It describes the river system, those who operate and use it, the agreements and policies that guide system operation, and annual planning for multiple-use operation.

  18. U. S. Department of Energy Savannah River Operations Office - Tenant

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Organizations Organizations Tenant Organizations Federal Offices National Nuclear Security Administration External Link Office of Environmental Management External Link U. S. Forest Service - Savannah River External Link Contractor Organizations Savannah River Nuclear Solutions External Link Savannah River National Laboratory External Link Savannah River Remediation External Link Centerra University of Georgia - Savannah River Ecology Laboratory External Link Shaw AREVA MOX Services External

  19. Deep drilling data, Raft River geothermal area, Idaho-Raft River...

    Open Energy Info (EERE)

    data, Raft River geothermal area, Idaho-Raft River geothermal exploration well sidetrack-C Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Deep drilling...

  20. Savannah River Site Vegetation Map | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Set-Aside Program SREL HOME Savannah River Site Vegetation Map swatch 1. Industrial swatch 2. Open water swatch 3. Bare soil / bare surface swatch 4. Sparse herbaceous vegetation swatch 5. Grasses and forbs swatch 6. Shrubs, grasses, and forbs swatch 7. Disturbed and revegetated in 1997 swatch 8. Marsh / aquatic macrophytes swatch 9. Young, open-canopy loblolly pine swatch 10. Open-canopy loblolly pine swatch 11. Young, dense-canopy loblolly pine swatch 12. Dense-canopy loblolly pine swatch 13.

  1. Savannah River BioEnergy Integration Center Savannah River BioEnergy Integration Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BioEnergy Integration Center Savannah River BioEnergy Integration Center Savannah River Savannah River Nuclear Solutions, LLC, Mission Development January 14, 2010 - Rev 3 DRAFT - Business Sensitive Savannah River BioEnergy Integration Center Contents 2 Mission Need for BioEnergy Integration Center 3 Overview of the BioEnergy Integration Center 4 Expected Outcomes and Benefits 5 Implementation Approach and Timeline 6 Financial Considerations DRAFT - BUSINESS SENSITIVE Henry Ford really had a

  2. Beijing Changjiang River International Holding | Open Energy...

    Open Energy Info (EERE)

    100761 Sector: Services Product: Beijing Changjiang River International Holding is a Chinese emissions broker and services company. Coordinates: 39.90601, 116.387909 Show Map...

  3. PIA - Savannah River Nuclear Solutions Electronic Safeguards...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Meeting registration web site PIA - HSPD-12 Physical and Logical Access System PIA - Savannah River Nuclear Solution SRNS Electronic Document Workflow RECORDS System (EDWS

  4. River Corridor Closure Project Partnering Performance Agreement...

    Office of Environmental Management (EM)

    - March 2009 Voluntary Protection Program Onsite Review, River Corridor Closure Project - June 2012 Indoctrinating Subcontractors into the DOE Safety Culture and Expectations...

  5. Big River Resources LLC | Open Energy Information

    Open Energy Info (EERE)

    Resources LLC Jump to: navigation, search Name: Big River Resources LLC Place: West Burlington, Iowa Zip: 52655 Product: Dry-mill bioethanol producer with a cooperative structure....

  6. The Columbia River System Inside Story

    SciTech Connect (OSTI)

    2001-04-01

    The Columbia River is one of the greatest natural resources in the western United States. The river and its tributaries touch the lives of nearly every resident of the Pacific Northwest—from fostering world-famous Pacific salmon to supplying clean natural fuel for 50 to 65 percent of the region’s electrical generation. Since early in the 20th century, public and private agencies have labored to capture the benefits of this dynamic river. Today, dozens of major water resource projects throughout the region are fed by the waters of the Columbia Basin river system.

  7. Big Rivers Electric Corp | Open Energy Information

    Open Energy Info (EERE)

    (270) 827-2561 Website: www.bigrivers.com Facebook: https:www.facebook.compagesBig-Rivers-Electric-Corporation142180855818082?rf154289971250771 Outage Hotline: (270)...

  8. Enforcement Letter, Westinghouse Savannah River Company - November...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Company related to repeated criticality safety violations in 2002 and 2003 at the H-Canyon facility at DOE's Savannah River Site. PDF icon Enforcement Letter, Westinghouse...

  9. River Valley Technology Center | Open Energy Information

    Open Energy Info (EERE)

    Valley Technology Center Jump to: navigation, search Name: River Valley Technology Center Place: United States Sector: Services Product: General Financial & Legal Services (...

  10. Two Rivers Water & Light | Open Energy Information

    Open Energy Info (EERE)

    Water & Light Jump to: navigation, search Name: Two Rivers Water & Light Place: Wisconsin Phone Number: (920) 793-5550 Website: trwaterandlight.com Facebook: https:...

  11. In the News | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Touch an Animal Day (WJBF, 22 Aug. 2015) UGA collaboration ... rabies (UGA Columns, 24 Feb. 2015) Savannah River ... Chronicle, 25 Dec. 2013) Ecology lab studies birds ...

  12. Lower Colorado River Authority | Open Energy Information

    Open Energy Info (EERE)

    Name: Lower Colorado River Authority Place: Texas Website: www.lcra.orgPagesdefault.asp Twitter: @lcra Facebook: https:www.facebook.comlowercoloradoriverauthority Outage...

  13. Savannah River Laboratory monthly report, November 1991

    SciTech Connect (OSTI)

    Ferrell, J.M.

    1991-12-31

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation; tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

  14. Savannah River Laboratory monthly report, November 1991

    SciTech Connect (OSTI)

    Ferrell, J.M.

    1991-01-01

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation; tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

  15. Savannah River Laboratory monthly report, September 1991

    SciTech Connect (OSTI)

    Ferrell, J.M.

    1991-01-01

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation, tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

  16. Savannah River Laboratory monthly report, September 1991

    SciTech Connect (OSTI)

    Ferrell, J.M.

    1991-12-31

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation, tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

  17. Savannah River Laboratory monthly report, July 1991

    SciTech Connect (OSTI)

    Ferrell, J.M.

    1991-01-01

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation; tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

  18. Savannah River Laboratory monthly report, July 1991

    SciTech Connect (OSTI)

    Ferrell, J.M.

    1991-12-31

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation; tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

  19. Savannah River Laboratory monthly report, August 1991

    SciTech Connect (OSTI)

    Ferrell, J.M.

    1991-12-31

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation, tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

  20. Savannah River Laboratory monthly report, August 1991

    SciTech Connect (OSTI)

    Ferrell, J.M.

    1991-01-01

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation, tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

  1. Preliminary Notice of Violation, Westinghouse Savannah River...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Achievable (ALARA) deficiencies that contributed to unplanned worker uptakes and the spread of contamination at DOE's Savannah River Site. PDF icon Preliminary Notice of...

  2. Independent Oversight Review, Savannah River Operations Office...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and subcontractor employees at the Savannah River Site (SRS). This targeted review was performed at SRS from June 3 to 5, 2013. This report discusses the background, ...

  3. Power of the River History Book

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Power-of-the-River-BPA-History-Book Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects &...

  4. Lumbee River EMC- Residential Energy Efficiency Program

    Broader source: Energy.gov [DOE]

    Lumbee River EMC (LREMC) offers rebates to its residential customers who purchase and install qualified energy efficient products or services. Rebates are available for:

  5. Savannah River Laboratory monthly report, October 1991

    SciTech Connect (OSTI)

    Ferrell, J.M.

    1991-01-01

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation, tritium facilities and production; separations operations; environmental concerns; and waste management. (FI)

  6. Savannah River Laboratory monthly report, October 1991

    SciTech Connect (OSTI)

    Ferrell, J.M.

    1991-12-31

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation, tritium facilities and production; separations operations; environmental concerns; and waste management. (FI)

  7. New Columbia River Estuary purchases benefit salmon

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the mouth of the Columbia River to permanently protect riverside habitat for Northwest fish and wildlife, including threatened and endangered salmon and steelhead. The...

  8. Brochure: Federal Columbia River Power System (FCRPS)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    these agencies maximize the use of the Columbia River by generating power, protecting fish and wildlife, controlling floods, providing irrigation and navigation, and sustaining...

  9. Roger Seitz Savannah River National Laboratory

    Office of Environmental Management (EM)

    Practical Considerations for Development and Selection of Scenarios Roger Seitz Savannah River ... Dust, Radon Drinking Water Fish Plant Foods Meat Milk Radioactively Contaminated ...

  10. Savannah River National Laboratory (SRNL) Environmental Sciences...

    Office of Environmental Management (EM)

    National Laboratory (SRNL) Environmental Sciences and Biotechnology Support of Waste Isolation Pilot Plant (WIPP) Savannah River National Laboratory (SRNL) Environmental Sciences ...

  11. Home | Savannah River Ecology Laboratory Environmental Outreach...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    diverse ecological research conducted by scientists at the Savannah River Ecology Laboratory. ... and pine snakes wild hog skull edible plant samples View Touch an Animal Day 2015 ...

  12. Preliminary Notice of Violation, Westinghouse Savannah River...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Enforcement (OE) investigation of the facts and circumstances concerning the unnecessary radiation exposure of three Westinghouse Savannah River Company (WSRC) personnel and the...

  13. Gila River Indian Community- 2012 Project

    Broader source: Energy.gov [DOE]

    The Gila River Indian Community (GRIC) will conduct feasibility studies of potential renewable energy projects on its lands in south central Arizona.

  14. Savannah River Needs Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This Needs Assessment for former Savannah River Site construction workers was developed for the purpose of collecting existing information relevant to exposure and health outcomes ...

  15. Brazos River Authority | Open Energy Information

    Open Energy Info (EERE)

    Place: Texas Phone Number: 1-888-922-6272 Website: www.brazos.org Facebook: https:www.facebook.compagesBrazos-River-Authority126719790675809?frefts Outage Hotline:...

  16. Cuivre River Electric- Energy Efficiency Rebate Programs

    Broader source: Energy.gov [DOE]

    Cuivre River Electric Cooperative, through the Take Control & Save program, offers rebates for cooperative members who purchase efficient geothermal and dual fuel heat pumps, and electric water...

  17. ENVIRONMENTAL SCIENCES; SAVANNAH RIVER PLANT; ENVIRONMENTAL EFFECTS...

    Office of Scientific and Technical Information (OSTI)

    5 audit of SRP radioactive waste Ashley, C. 05 NUCLEAR FUELS; 54 ENVIRONMENTAL SCIENCES; SAVANNAH RIVER PLANT; ENVIRONMENTAL EFFECTS; RADIOACTIVE EFFLUENTS; EMISSION; HIGH-LEVEL...

  18. Turbine airfoil having outboard and inboard sections

    DOE Patents [OSTI]

    Mazzola, Stefan; Marra, John J

    2015-03-17

    A turbine airfoil usable in a turbine engine and formed from at least an outboard section and an inboard section such that an inner end of the outboard section is attached to an outer end of the inboard section. The outboard section may be configured to provide a tip having adequate thickness and may extend radially inward from the tip with a generally constant cross-sectional area. The inboard section may be configured with a tapered cross-sectional area to support the outboard section.

  19. Forecasting changes in water quality in rivers associated with growing biofuels in the Arkansas-White-Red river drainage, USA

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Jager, Henriette I.; Baskaran, Latha M.; Schweizer, Peter E.; Turhollow, Anthony F.; Brandt, Craig C.; Srinivasan, Raghavan

    2014-05-15

    We study that the mid-section of the Arkansas-White-Red (AWR) river basin near the 100th parallel is particularly promising for sustainable biomass production using cellulosic perennial crops and residues. Along this longitudinal band, precipitation becomes limiting to competing crops that require irrigation from an increasingly depleted groundwater aquifer. In addition, the deep-rooted perennial, switchgrass, produces modest-to-high yields in this region with minimal inputs and could compete against alternative crops and land uses at relatively low cost. Previous studies have also suggested that switchgrass and other perennial feedstocks offer environmentally benign alternatives to corn and corn stover. However, water quality implications remainmore » a significant concern for conversion of marginal lands to bioenergy production because excess nutrients produced by agriculture for food or for energy contribute to eutrophication in the dead-zone in the Gulf of Mexico. This study addresses water quality implications for the AWR river basin. We used the SWAT model to compare water quality in rivers draining a baseline, pre-cellulosic-bioenergy and post-cellulosic-bioenergy landscapes for 2022 and 2030. Simulated water quality responses varied across the region, but with a net tendency toward decreased amounts of nutrient and sediment, particularly in subbasins with large areas of bioenergy crops in 2030 future scenarios. We conclude that water quality is one aspect of sustainability for which cellulosic bioenergy production in this region holds promise.« less

  20. Forecasting changes in water quality in rivers associated with growing biofuels in the Arkansas-White-Red river basin, USA

    SciTech Connect (OSTI)

    Jager, Yetta; Brandt, Craig C; Baskaran, Latha Malar; Srinivasan, Raghavan; Turhollow Jr, Anthony F; Schweizer, Peter E

    2015-01-01

    The mid-section of the Arkansas-White-Red (AWR) river basin near the 100th parallel is particularly promising for sustainable biomass production using cellulosic perennial crops and residues. Along this longitudinal band, precipitation becomes limiting to competing crops that require irrigation from an increasingly depleted groundwater aquifer. In addition, the deep-rooted perennial, switchgrass, produces modest-to-high yields in this region with minimal inputs and could compete against alternative crops and land uses at relatively low cost. Previous studies have also suggested that switchgrass and other perennial feedstocks offer environmentally benign alternatives to corn and corn stover. However, water quality implications remain a significant concern for conversion of marginal lands to bioenergy production because excess nutrients produced by agriculture for food or for energy contribute to eutrophication in the dead-zone in the Gulf of Mexico. This study addresses water quality implications for the AWR river basin. We used the SWAT model to compare water quality in rivers draining a baseline, pre-cellulosic-bioenergy and post-cellulosic-bioenergy landscapes for 2022 and 2030. Simulated water quality responses varied across the region, but with a net tendency toward decreased amounts of nutrient and sediment, particularly in subbasins with large areas of bioenergy crops in 2030 future scenarios. We conclude that water quality is one aspect of sustainability for which cellulosic bioenergy production in this region holds promise.

  1. Forecasting changes in water quality in rivers associated with growing biofuels in the Arkansas-White-Red river basin, USA

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Jager, Yetta; Brandt, Craig C; Baskaran, Latha Malar; Srinivasan, Raghavan; Turhollow Jr, Anthony F; Schweizer, Peter E

    2015-01-01

    The mid-section of the Arkansas-White-Red (AWR) river basin near the 100th parallel is particularly promising for sustainable biomass production using cellulosic perennial crops and residues. Along this longitudinal band, precipitation becomes limiting to competing crops that require irrigation from an increasingly depleted groundwater aquifer. In addition, the deep-rooted perennial, switchgrass, produces modest-to-high yields in this region with minimal inputs and could compete against alternative crops and land uses at relatively low cost. Previous studies have also suggested that switchgrass and other perennial feedstocks offer environmentally benign alternatives to corn and corn stover. However, water quality implications remain a significant concernmore » for conversion of marginal lands to bioenergy production because excess nutrients produced by agriculture for food or for energy contribute to eutrophication in the dead-zone in the Gulf of Mexico. This study addresses water quality implications for the AWR river basin. We used the SWAT model to compare water quality in rivers draining a baseline, pre-cellulosic-bioenergy and post-cellulosic-bioenergy landscapes for 2022 and 2030. Simulated water quality responses varied across the region, but with a net tendency toward decreased amounts of nutrient and sediment, particularly in subbasins with large areas of bioenergy crops in 2030 future scenarios. We conclude that water quality is one aspect of sustainability for which cellulosic bioenergy production in this region holds promise.« less

  2. Reference Inflow Characterization for River Resource Reference Model (RM2)

    SciTech Connect (OSTI)

    Neary, Vincent S [ORNL

    2011-12-01

    Sandia National Laboratory (SNL) is leading an effort to develop reference models for marine and hydrokinetic technologies and wave and current energy resources. This effort will allow the refinement of technology design tools, accurate estimates of a baseline levelized cost of energy (LCoE), and the identification of the main cost drivers that need to be addressed to achieve a competitive LCoE. As part of this effort, Oak Ridge National Laboratory was charged with examining and reporting reference river inflow characteristics for reference model 2 (RM2). Published turbulent flow data from large rivers, a water supply canal and laboratory flumes, are reviewed to determine the range of velocities, turbulence intensities and turbulent stresses acting on hydrokinetic technologies, and also to evaluate the validity of classical models that describe the depth variation of the time-mean velocity and turbulent normal Reynolds stresses. The classical models are found to generally perform well in describing river inflow characteristics. A potential challenge in river inflow characterization, however, is the high variability of depth and flow over the design life of a hydrokinetic device. This variation can have significant effects on the inflow mean velocity and turbulence intensity experienced by stationary and bottom mounted hydrokinetic energy conversion devices, which requires further investigation, but are expected to have minimal effects on surface mounted devices like the vertical axis turbine device designed for RM2. A simple methodology for obtaining an approximate inflow characterization for surface deployed devices is developed using the relation umax=(7/6)V where V is the bulk velocity and umax is assumed to be the near-surface velocity. The application of this expression is recommended for deriving the local inflow velocity acting on the energy extraction planes of the RM2 vertical axis rotors, where V=Q/A can be calculated given a USGS gage flow time-series and stage vs. cross-section area rating relationship.

  3. Hood River Passive House, Hood River, Oregon (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2014-02-01

    The Hood River Passive Project was developed by Root Design Build of Hood River Oregon using the Passive House Planning Package (PHPP) to meet all of the requirements for certification under the European Passive House standards. The Passive House design approach has been gaining momentum among residential designers for custom homes and BEopt modeling indicates that these designs may actually exceed the goal of the U.S. Department of Energy's (DOE) Building America program to "reduce home energy use by 30%-50%" (compared to 2009 energy codes for new homes). This report documents the short term test results of the Shift House and compares the results of PHPP and BEopt modeling of the project. The design includes high R-Value assemblies, extremely tight construction, high performance doors and windows, solar thermal DHW, heat recovery ventilation, moveable external shutters and a high performance ductless mini-split heat pump. Cost analysis indicates that many of the measures implemented in this project did not meet the BA standard for cost neutrality. The ductless mini-split heat pump, lighting and advanced air leakage control were the most cost effective measures. The future challenge will be to value engineer the performance levels indicated here in modeling using production based practices at a significantly lower cost.

  4. ROBOTICS IN HAZARDOUS ENVIRONMENTS - REAL DEPLOYMENTS BY THE SAVANNAH RIVER NATIONAL LABORATORY

    SciTech Connect (OSTI)

    Kriikku, E.; Tibrea, S.; Nance, T.

    2010-09-27

    The Research & Development Engineering (R&DE) section in the Savannah River National Laboratory (SRNL) engineers, integrates, tests, and supports deployment of custom robotics, systems, and tools for use in radioactive, hazardous, or inaccessible environments. Mechanical and electrical engineers, computer control professionals, specialists, machinists, welders, electricians, and mechanics adapt and integrate commercially available technology with in-house designs, to meet the needs of Savannah River Site (SRS), Department of Energy (DOE), and other governmental agency customers. This paper discusses five R&DE robotic and remote system projects.

  5. Smith River Rancheria- 2003 Project

    Broader source: Energy.gov [DOE]

    Implement a planning effort that addresses current and future energy needs and results in a long-term sustainable plan for energy self-sufficiency on the Rancheria. The Smith River Rancheria, located in northern Del Norte County, California about four miles south of the Oregon border on the Pacific Ocean, composes 184.4 acres. This effort is intended to promote energy self-sufficiency and assist in meeting the tribe's goal to preserve and protect the aboriginal territory of the Tolowa People.

  6. Louisiana Nuclear Profile - River Bend

    U.S. Energy Information Administration (EIA) Indexed Site

    River Bend" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date" 1,974,"8,363",98.0,"BWR","application/vnd.ms-excel","application/vnd.ms-excel" ,974,"8,363",98.0 "Data for 2010" "BWR = Boiling

  7. Florida Nuclear Profile - Crystal River

    U.S. Energy Information Administration (EIA) Indexed Site

    Crystal River1" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date" 3,860,0,"--","PWR","application/vnd.ms-excel","application/vnd.ms-excel" ,860,0,"--" "Data for 2010" "1 Unit was offline in 2010 for repairs." "-- Not applicable.

  8. EA-273-A Rainy River Energy Corporation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    -A Rainy River Energy Corporation EA-273-A Rainy River Energy Corporation Order authorizing Rainy River Energy Corporation to export electric energy to Canada. PDF icon EA-273-A ...

  9. Part IV: Section D - Packaging and Marking

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PART I SECTION D PACKAGING AND MARKING DE-AC36-08GO28308 Modification M901 Section D - Page ii PART I SECTION D PACKAGING AND MARKING TABLE OF CONTENTS D.1 Packaging 1 D.2 Marking ...

  10. EA-1692: Red River Environmental Products, LLC Activated Carbon

    Energy Savers [EERE]

    Manufacturing Facility, Red River Parish, LA | Department of Energy 2: Red River Environmental Products, LLC Activated Carbon Manufacturing Facility, Red River Parish, LA EA-1692: Red River Environmental Products, LLC Activated Carbon Manufacturing Facility, Red River Parish, LA June 1, 2010 EA-1692: Final Environmental Assessment Construction and Start-Up of an Activated Carbon Manufacturing Facility in Red River Parish, Louisiana June 11, 2010 EA-1692: Finding of No Significant Impact Red

  11. Comments of the Lower Colorado River Authority | Department of Energy

    Energy Savers [EERE]

    Lower Colorado River Authority Comments of the Lower Colorado River Authority Comments of the Lower Colorado River Authority on Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy PDF icon Comments of the Lower Colorado River Authority More Documents & Publications Lower Colorado River Authority Lower Colorado River Authority NBP RFI: Communications Requirements- Comments of Meeker Cooperative Light

  12. The Savannah River Site's Groundwater Monitoring Program, second quarter 1990

    SciTech Connect (OSTI)

    Not Available

    1991-02-07

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site's (SRS) Groundwater Monitoring Program. During second quarter 1990 (April through June) EPD/EMS conducted routine sampling of monitoring wells and drinking water locations. EPD/EMS established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the second quarter is presented in the Flagging Criteria section of this document. All analytical results from second quarter 1990 are listed in this report.

  13. The Savannah River Site's Groundwater Monitoring Program: Fourth quarter 1991

    SciTech Connect (OSTI)

    Rogers, C.D. )

    1992-06-02

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site's (SRS) Groundwater Monitoring Program. During fourth quarter 1991, EPD/EMS conducted extensive sampling of monitoring wells. EPD/EMS established two sets of criteria in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead, they aid personnel in sample scheduling, interpretation of data, and trend identification. Beginning in 1991, the flagging criteria are based on EPA drinking water standards and method detection limits. A detailed explanation of the current flagging criteria is presented in the Flagging Criteria section of this document. Analytical results from fourth quarter 1991 are listed in this report.

  14. Vermont Section 401 Water Quality Certification Application ...

    Open Energy Info (EERE)

    Abstract Application required for Section 401 water quality certification under the Clean Water Act. Form Type ApplicationNotice Form Topic Section 401 Water Quality...

  15. OpenEI Community - Section 7

    Open Energy Info (EERE)

    http:en.openei.orgcommunityblogidaho-meeting-2comments endangered species Fauna Fish and Wildlife Flora FWS Section 12 Section 7 Geothermal Regulatory Roadmap Wed, 05 Sep...

  16. Wild and Scenic Rivers Act (1968)

    Broader source: Energy.gov [DOE]

    The National Wild and Scenic Rivers System was created by Congress in 1968 (Public Law 90-542; 16 U.S.C. 1271 et seq.) to preserve certain rivers with outstanding natural, cultural, and recreational values in a free-flowing condition for the enjoyment of present and future generations.

  17. Savannah River Site Environmental Report for 1998

    SciTech Connect (OSTI)

    Arnett, M.

    1999-06-09

    The mission at the Savannah River Site (SRS) is focused primarily on support of the national defense, nonproliferation, and environmental cleanup. SRS-through its prime operating contractor, Westinghouse Savannah River Company-continues to maintain a comprehensive environmental monitoring program.

  18. PIA - Savannah River Nuclear Solution SRNS Electronic Document...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SRNS Electronic Document Workflow RECORDS System (EDWS) PIA - Savannah River Nuclear Solution SRNS Electronic Document Workflow RECORDS System (EDWS) PIA - Savannah River Nuclear ...

  19. PIA - Savannah River Nuclear Solution SRNS ProRad Environment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (HRMS) PIA - Savannah River Nuclear Solution (SRNS) Procurement Cycle System (PCS) PIA - Savannah River Nuclear Solution SRNS Electronic Document Workflow RECORDS System (EDWS

  20. PP-41 Mirias River Electric Cooperative, Inc. | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Mirias River Electric Cooperative, Inc. to constuct, operate, and maintain electric transmission facilities at the U.S.- Canada Border. PDF icon PP-41 Mirias River Electric ...

  1. ITP LEADER Case Study: Flambeau River Papers Makes a Comeback...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    LEADER Case Study: Flambeau River Papers Makes a Comeback With a Revised Energy Strategy ITP LEADER Case Study: Flambeau River Papers Makes a Comeback With a Revised Energy ...

  2. Vermont Watershed Management Rivers Program Website | Open Energy...

    Open Energy Info (EERE)

    Vermont Watershed Management Rivers Program Website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Vermont Watershed Management Rivers Program Website...

  3. American Society of Mechanical Engineers/Savannah River National...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Summary American Society of Mechanical EngineersSavannah River National Laboratory (ASME... More Documents & Publications American Society of Mechanical EngineersSavannah River ...

  4. American Society of Mechanical Engineers/Savannah River National...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Agenda American Society of Mechanical EngineersSavannah River National Laboratory (ASME... More Documents & Publications American Society of Mechanical EngineersSavannah River ...

  5. American Society of Mechanical Engineers/Savannah River National...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Meeting Attendee List American Society of Mechanical EngineersSavannah River National ... More Documents & Publications American Society of Mechanical EngineersSavannah River ...

  6. Savannah River Site Contractor Resumes Full Operations Following...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Savannah River Site Contractor Resumes Full Operations Following Pause April 27, 2016 - 12:25pm Addthis AIKEN, S.C. - Savannah River Site management and operations contractor ...

  7. Lichuan City Yujiang River Valley Hydro Co Ltd | Open Energy...

    Open Energy Info (EERE)

    Lichuan City Yujiang River Valley Hydro Co Ltd Jump to: navigation, search Name: Lichuan City Yujiang River Valley Hydro Co., Ltd. Place: Hubei Province, China Zip: 445400 Sector:...

  8. Savannah River Field Office | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Us Our Operations Management and Budget Office of Civil Rights Workforce Statistics Savannah River Field Office Savannah River Field Office FY15 Year End Report Semi...

  9. White River Electric Assn, Inc | Open Energy Information

    Open Energy Info (EERE)

    Assn, Inc Jump to: navigation, search Name: White River Electric Assn, Inc Place: Colorado Website: www.white-river-electric-assoc Twitter: @WREAColorado Facebook: https:...

  10. 2012 Annual Planning Summary for Savannah River Operations Office...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Savannah River Operations Office 2012 Annual Planning Summary for Savannah River Operations Office The ongoing and projected Environmental Assessments and Environmental Impact ...

  11. Ventilation System to Improve Savannah River Site's Liquid Waste...

    Office of Environmental Management (EM)

    Ventilation System to Improve Savannah River Site's Liquid Waste Operations Ventilation System to Improve Savannah River Site's Liquid Waste Operations August 28, 2014 - 12:00pm ...

  12. PIA - Savannah River Operations Office Lotus Domino/Notes System...

    Broader source: Energy.gov (indexed) [DOE]

    Lotus DominoNotes System PDF icon PIA - Savannah River Operations Office Lotus DominoNotes System More Documents & Publications PIA - DOE Savannah River Operations Office PRISM ...

  13. FY 2012 Savannah River Nuclear Solutions, LLC, PER Summary |...

    National Nuclear Security Administration (NNSA)

    12 Savannah River Nuclear Solutions, LLC, PER Summary SUMMARY OF FY 2012 SAVANNAH RIVER NUCLEAR SOLUTIONS, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  14. FY 2010 Savannah River Nuclear Solutions, LLC, PER Summary |...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0 Savannah River Nuclear Solutions, LLC, PER Summary SUMMARY OF FY 2010 SAVANNAH RIVER NUCLEAR SOLUTIONS, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  15. PIA - Savannah River Site Management and Operating Contractor...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Site Management and Operating Contractor (HRMS) PIA - Savannah River Site Management and Operating Contractor (HRMS) PIA - Savannah River Site Management and Operating Contractor ...

  16. Small Column Ion Exchange at Savannah River Site Technology Readiness...

    Broader source: Energy.gov (indexed) [DOE]

    Small Column Ion Exchange at Savannah River Site Technology Readiness Assessment Report More Documents & Publications Small Column Ion Exchange Technology at Savannah River Site ...

  17. John C. Barnes of Savannah River Operations named 2012 Facility...

    Energy Savers [EERE]

    John C. Barnes of Savannah River Operations named 2012 Facility Representative of the Year John C. Barnes of Savannah River Operations named 2012 Facility Representative of the ...

  18. PIA - Savannah River Nuclear Solutions Badge Request and Site...

    Energy Savers [EERE]

    Badge Request and Site Personnel Roster Systems PIA - Savannah River Nuclear Solutions Badge Request and Site Personnel Roster Systems PIA - Savannah River Nuclear Solutions Badge ...

  19. Savannah River Site Cleanup By the Numbers | Department of Energy

    Office of Environmental Management (EM)

    Site Cleanup By the Numbers Savannah River Site Cleanup By the Numbers Savannah River Site Cleanup By the Numbers In 2015, EM developed site infographics highlighting each sites ...

  20. FY 2008 Washington Savannah River Company, LLC, PER Summary ...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 Washington Savannah River Company, LLC, PER Summary SUMMARY OF FY 2008 WASHINGTON SAVANNAH RIVER COMPANY, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  1. Passive Groundwater Cleanup Measures Save Savannah River Site...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Passive Groundwater Cleanup Measures Save Savannah River Site Millions of Dollars Passive Groundwater Cleanup Measures Save Savannah River Site Millions of Dollars November 25, ...

  2. Centerra Earns High Performance Rating for Savannah River Site...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Centerra Earns High Performance Rating for Savannah River Site Security Operations Centerra Earns High Performance Rating for Savannah River Site Security Operations January 27, ...

  3. U. S. Department of Energy Savannah River Operations Office ...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Small Business Forum Technology Demos & opportunities The Department of Energy Office of Environmental Management, Savannah River Site and the Savannah River National Laboratory ...

  4. Savannah River National Laboratory by the Numbers August 2015

    Office of Environmental Management (EM)

    In 1951, the Savannah River Laboratory was created to support these efforts. In 2004 the laboratory was designated a National Laboratory, renamed Savannah River National Laboratory ...

  5. FY 2006 Washington Savannah River Company, LLC, PER Summary ...

    National Nuclear Security Administration (NNSA)

    6 Washington Savannah River Company, LLC, PER Summary SUMMARY OF FY 2006 WASHINGTON SAVANNAH RIVER COMPANY, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  6. Enterprise Assessments Review, Savannah River Site 2014 Site...

    Energy Savers [EERE]

    Savannah River Site 2014 Site-Level Exercise - January 2015 Enterprise Assessments Review, Savannah River Site 2014 Site-Level Exercise - January 2015 January 2015 Review of the ...

  7. Disposal Practices at the Savannah River Site | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Practices at the Savannah River Site Disposal Practices at the Savannah River Site Full Document and Summary Versions are available for download PDF icon Disposal Practices at the ...

  8. Dennis Yates Of Savannah River Operations Named 2013 Facility...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Dennis Yates Of Savannah River Operations Named 2013 Facility Representative Of The Year Dennis Yates Of Savannah River Operations Named 2013 Facility Representative Of The Year ...

  9. Independent Oversight Follow-up Review, Savannah River National...

    Energy Savers [EERE]

    Savannah River National Laboratory - January 2012 Independent Oversight Follow-up Review, Savannah River National Laboratory - January 2012 January 2012 Follow-up Review of ...

  10. DOE - Office of Legacy Management -- Savannah River Swamp - SC...

    Office of Legacy Management (LM)

    Savannah River Swamp - SC 01 FUSRAP Considered Sites Site: Savannah River Swamp (SC.01 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site ...

  11. Construction Workers Achieve Safety Milestone at Savannah River...

    Office of Environmental Management (EM)

    Construction Workers Achieve Safety Milestone at Savannah River Site Construction Workers Achieve Safety Milestone at Savannah River Site April 29, 2014 - 4:23pm Addthis Savannah ...

  12. Microsoft PowerPoint - Allison - Savannah River Presentation

    Office of Environmental Management (EM)

    September 30, 2009 September 30, 2009 JEFFREY M. ALLISON, MANAGER JEFFREY M. ALLISON, MANAGER Savannah River Operations Office Savannah River Operations Office The State of ...

  13. DEPARTMENT OF ENERGY CITES SAVANNAH RIVER NUCLEAR SOLUTIONS,...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SAVANNAH RIVER NUCLEAR SOLUTIONS, LLC FOR WORKER SAFETY AND HEALTH VIOLATIONS November 9, ... Notice of Violation (PNOV) to Savannah River Nuclear Solutions, LLC (SRNS) for ...

  14. DOE Order 435.1 Performance Assessment Savannah River Site |...

    Energy Savers [EERE]

    Order 435.1 Performance Assessment Savannah River Site DOE Order 435.1 Performance Assessment Savannah River Site Performance Assessments (PA) are analyses conducted for low level ...

  15. Employee of Savannah River Site Contractor Recognized as Exemplary...

    Office of Environmental Management (EM)

    Employee of Savannah River Site Contractor Recognized as Exemplary in Safety and Health Employee of Savannah River Site Contractor Recognized as Exemplary in Safety and Health ...

  16. Ground Magnetics At Raft River Geothermal Area (1979) | Open...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1979) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Magnetics At Raft River Geothermal Area (1979)...

  17. Numerical Modeling At Raft River Geothermal Area (1983) | Open...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1983) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Numerical Modeling At Raft River Geothermal Area (1983)...

  18. Micro-Earthquake At Raft River Geothermal Area (1979) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Micro-Earthquake At Raft River Geothermal Area (1979) Exploration Activity Details Location Raft River...

  19. Fluid Inclusion Analysis At Raft River Geothermal Area (2011...

    Open Energy Info (EERE)

    Raft River Geothermal Area (2011) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Fluid Inclusion Analysis At Raft River Geothermal Area (2011)...

  20. Cuttings Analysis At Raft River Geothermal Area (1976) | Open...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1976) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Cuttings Analysis At Raft River Geothermal Area (1976)...

  1. Update on the Raft River Geothermal Reservoir | Open Energy Informatio...

    Open Energy Info (EERE)

    the Raft River Geothermal Reservoir Jump to: navigation, search OpenEI Reference LibraryAdd to library Conference Proceedings: Update on the Raft River Geothermal Reservoir...

  2. Groundwater Sampling At Raft River Geothermal Area (1974-1982...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Groundwater Sampling At Raft River Geothermal Area (1974-1982) Exploration Activity Details Location Raft River...

  3. Micro-Earthquake At Raft River Geothermal Area (2011) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Micro-Earthquake At Raft River Geothermal Area (2011) Exploration Activity Details Location Raft River...

  4. Electromagnetic Soundings At Raft River Geothermal Area (1977...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1977) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Electromagnetic Soundings At Raft River Geothermal Area (1977)...

  5. Thermochronometry At Raft River Geothermal Area (1993) | Open...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1993) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Thermochronometry At Raft River Geothermal Area (1993)...

  6. Isotopic Analysis-Fluid At Raft River Geothermal Area (1982)...

    Open Energy Info (EERE)

    GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Isotopic Analysis-Fluid At Raft River Geothermal Area (1982) Exploration Activity Details Location Raft River...

  7. Telluric Survey At Raft River Geothermal Area (1978) | Open Energy...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1978) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Telluric Survey At Raft River Geothermal Area (1978)...

  8. Ground Gravity Survey At Raft River Geothermal Area (1978) |...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity Survey At Raft River Geothermal Area (1978) Exploration Activity Details Location Raft River...

  9. Direct-Current Resistivity Survey At Raft River Geothermal Area...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1983) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Direct-Current Resistivity Survey At Raft River Geothermal Area...

  10. DC Resistivity Survey (Schlumberger Array) At Raft River Geothermal...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1974-1975) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: DC Resistivity Survey (Schlumberger Array) At Raft River...

  11. Development Wells At Raft River Geothermal Area (2004) | Open...

    Open Energy Info (EERE)

    Development Wells At Raft River Geothermal Area (2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Development Wells At Raft River Geothermal...

  12. Self Potential Measurements At Raft River Geothermal Area (1983...

    Open Energy Info (EERE)

    Measurements At Raft River Geothermal Area (1983) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Self Potential Measurements At Raft River...

  13. Audio-Magnetotellurics At Raft River Geothermal Area (1978) ...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1978) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Audio-Magnetotellurics At Raft River Geothermal Area (1978)...

  14. Earth Tidal Analysis At Raft River Geothermal Area (1984) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Earth Tidal Analysis At Raft River Geothermal Area (1984) Exploration Activity Details Location Raft River...

  15. Petrography Analysis At Raft River Geothermal Area (1980) | Open...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1980) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Petrography Analysis At Raft River Geothermal Area (1980)...

  16. Core Analysis At Raft River Geothermal Area (1979) | Open Energy...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1979) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Core Analysis At Raft River Geothermal Area (1979) Exploration...

  17. Geology and alteration of the Raft River geothermal system, Idaho...

    Open Energy Info (EERE)

    Raft River geothermal system, Idaho Jump to: navigation, search OpenEI Reference LibraryAdd to library Conference Proceedings: Geology and alteration of the Raft River geothermal...

  18. Airborne Electromagnetic Survey At Raft River Geothermal Area...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1979) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Airborne Electromagnetic Survey At Raft River Geothermal Area...

  19. Compound and Elemental Analysis At Raft River Geothermal Area...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1981) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Compound and Elemental Analysis At Raft River Geothermal Area...

  20. Isotopic Analysis-Fluid At Raft River Geothermal Area (1977)...

    Open Energy Info (EERE)

    GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Isotopic Analysis-Fluid At Raft River Geothermal Area (1977) Exploration Activity Details Location Raft River...

  1. Earth Tidal Analysis At Raft River Geothermal Area (1982) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Earth Tidal Analysis At Raft River Geothermal Area (1982) Exploration Activity Details Location Raft River...

  2. Earth Tidal Analysis At Raft River Geothermal Area (1980) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Earth Tidal Analysis At Raft River Geothermal Area (1980) Exploration Activity Details Location Raft River...

  3. Chemical Logging At Raft River Geothermal Area (1979) | Open...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1979) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Chemical Logging At Raft River Geothermal Area (1979)...

  4. Acoustic Logs At Raft River Geothermal Area (1979) | Open Energy...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1979) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Acoustic Logs At Raft River Geothermal Area (1979) Exploration...

  5. Fault Mapping At Raft River Geothermal Area (1993) | Open Energy...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1993) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Fault Mapping At Raft River Geothermal Area (1993) Exploration...

  6. Exhibit D: Mirant Potomac River Schedule of Operations: January...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Operations: January and February 2006 Exhibit D: Mirant Potomac River Schedule of Operations: January and February 2006 Docket No. EO-05-01. Exhibit D: Mirant Potomac River ...

  7. Tianlin Baile River Hydropower Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    Baile River Hydropower Co Ltd Jump to: navigation, search Name: Tianlin Baile River Hydropower Co., Ltd. Place: Baise, Guangxi Autonomous Region, China Zip: 533300 Sector: Hydro...

  8. Independent Oversight Review, Savannah River Site Salt Waste...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    August 2013 Independent Oversight Review, Savannah River Site Salt Waste Processing Facility - August 2013 August 2013 Review of the Savannah River Site Salt Waste Processing...

  9. Yingjiang County Binglang River Hydroelectric Power Co Ltd |...

    Open Energy Info (EERE)

    Yingjiang County Binglang River Hydroelectric Power Co Ltd Jump to: navigation, search Name: Yingjiang County Binglang River Hydroelectric Power Co., Ltd. Place: Dehong Dai-Jingpo...

  10. Enforcement Letter, Westinghouse Savannah River Company- June 4, 1996

    Broader source: Energy.gov [DOE]

    Issued to Westinghouse Savannah River Company related to Potential Violations of the Quality Assurance and Occupational Radiation Protection Rules at the Savannah River Site

  11. PIA - Savannah River Operations Office Executive Commitment Action...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Operations Office Executive Commitment Action Tracking System PIA - Savannah River Operations Office Executive Commitment Action Tracking System PIA - Savannah River Operations ...

  12. Ground Gravity Survey At Snake River Plain Region (DOE GTP) ...

    Open Energy Info (EERE)

    Ground Gravity Survey At Snake River Plain Region (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity Survey At Snake River...

  13. 2013 Annual Planning Summary for the Office of River Protection...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    River Protection and Richland Operations Office 2013 Annual Planning Summary for the Office of River Protection and Richland Operations Office The ongoing and projected ...

  14. Jichuan Taiyang River Hydro Power Development Co Ltd | Open Energy...

    Open Energy Info (EERE)

    Jichuan Taiyang River Hydro Power Development Co Ltd Jump to: navigation, search Name: Jichuan Taiyang River Hydro Power Development Co., Ltd. Place: Sichuan Province, China Zip:...

  15. Yunnan Daoyao County Duodi River Hydro Power Development Co Ltd...

    Open Energy Info (EERE)

    Daoyao County Duodi River Hydro Power Development Co Ltd Jump to: navigation, search Name: Yunnan Daoyao County Duodi River Hydro Power Development Co., Ltd. Place: Yunnan...

  16. Gansu Diantou Tao River Hydro Power Development Co Ltd | Open...

    Open Energy Info (EERE)

    River Hydro Power Development Co Ltd Jump to: navigation, search Name: Gansu Diantou Tao River Hydro Power Development Co. Ltd. Place: Lanzhou, Gansu Province, China Zip: 730030...

  17. Huanghe Hydropower Development Co Ltd Yellow River Group | Open...

    Open Energy Info (EERE)

    Huanghe Hydropower Development Co Ltd Yellow River Group Jump to: navigation, search Name: Huanghe Hydropower Development Co Ltd (Yellow River Group) Place: Xining, Qinghai...

  18. Geothermometry At New River Area (DOE GTP) | Open Energy Information

    Open Energy Info (EERE)

    New River Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geothermometry At New River Area (DOE GTP) Exploration Activity Details...

  19. Refraction Survey At Snake River Plain Region (DOE GTP) | Open...

    Open Energy Info (EERE)

    Snake River Plain Region (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Refraction Survey At Snake River Plain Region (DOE GTP)...

  20. Magnetotellurics At New River Area (DOE GTP) | Open Energy Information

    Open Energy Info (EERE)

    New River Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Magnetotellurics At New River Area (DOE GTP) Exploration Activity...