Powered by Deep Web Technologies
Note: This page contains sample records for the topic "river sockeye captive" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Snake River Sockeye Salmon Captive Broodstock Program Hatchery Element : Project Progress Report 2007 Annual Report.  

SciTech Connect (OSTI)

Numbers of Snake River sockeye salmon Oncorhynchus nerka have declined dramatically in recent years. In Idaho, only the lakes of the upper Salmon River (Sawtooth Valley) remain as potential sources of production (Figure 1). Historically, five Sawtooth Valley lakes (Redfish, Alturas, Pettit, Stanley, and Yellowbelly) supported sockeye salmon (Bjornn et al. 1968; Chapman et al. 1990). Currently, only Redfish Lake receives a remnant anadromous run. On April 2, 1990, the National Oceanic and Atmospheric Administration Fisheries Service (NOAA - formerly National Marine Fisheries Service) received a petition from the Shoshone-Bannock Tribes (SBT) to list Snake River sockeye salmon as endangered under the United States Endangered Species Act (ESA) of 1973. On November 20, 1991, NOAA declared Snake River sockeye salmon endangered. In 1991, the SBT, along with the Idaho Department of Fish & Game (IDFG), initiated the Snake River Sockeye Salmon Sawtooth Valley Project (Sawtooth Valley Project) with funding from the Bonneville Power Administration (BPA). The goal of this program is to conserve genetic resources and to rebuild Snake River sockeye salmon populations in Idaho. Coordination of this effort is carried out under the guidance of the Stanley Basin Sockeye Technical Oversight Committee (SBSTOC), a team of biologists representing the agencies involved in the recovery and management of Snake River sockeye salmon. National Oceanic and Atmospheric Administration Fisheries Service ESA Permit Nos. 1120, 1124, and 1481 authorize IDFG to conduct scientific research on listed Snake River sockeye salmon. Initial steps to recover the species involved the establishment of captive broodstocks at the Eagle Fish Hatchery in Idaho and at NOAA facilities in Washington State (for a review, see Flagg 1993; Johnson 1993; Flagg and McAuley 1994; Kline 1994; Johnson and Pravecek 1995; Kline and Younk 1995; Flagg et al. 1996; Johnson and Pravecek 1996; Kline and Lamansky 1997; Pravecek and Johnson 1997; Pravecek and Kline 1998; Kline and Heindel 1999; Hebdon et al. 2000; Flagg et al. 2001; Kline and Willard 2001; Frost et al. 2002; Hebdon et al. 2002; Hebdon et al. 2003; Kline et al. 2003a; Kline et al. 2003b; Willard et al. 2003a; Willard et al. 2003b; Baker et al. 2004; Baker et al. 2005; Willard et al. 2005; Baker et al. 2006; Plaster et al. 2006; Baker et al. 2007). The immediate goal of the program is to utilize captive broodstock technology to conserve the population's unique genetics. Long-term goals include increasing the number of individuals in the population to address delisting criteria and to provide sport and treaty harvest opportunity. (1) Develop captive broodstocks from Redfish Lake sockeye salmon, culture broodstocks and produce progeny for reintroduction. (2) Determine the contribution hatchery-produced sockeye salmon make toward avoiding population extinction and increasing population abundance. (3) Describe O. nerka population characteristics for Sawtooth Valley lakes in relation to carrying capacity and broodstock program reintroduction efforts. (4) Utilize genetic analysis to discern the origin of wild and broodstock sockeye salmon to provide maximum effectiveness in their utilization within the broodstock program. (5) Transfer technology through participation in the technical oversight committee process, provide written activity reports, and participate in essential program management and planning activities. Idaho Department of Fish and Game's participation in the Snake River Sockeye Salmon Captive Broodstock Program includes two areas of effort: (1) sockeye salmon captive broodstock culture, and (2) sockeye salmon research and evaluations. Although objectives and tasks from both components overlap and contribute to achieving the same goals, work directly related to sockeye salmon captive broodstock research and enhancement will appear under a separate cover. Research and enhancement activities associated with Snake River sockeye salmon are permitted under NOAA permit numbers 1120, 1124, and 1481. This report details fish

Baker, Dan J.; Heindel, Jeff A.; Green, Daniel G.; Kline, Paul A.

2008-12-17T23:59:59.000Z

2

Snake River Sockeye Salmon Captive Broodstock Program; Research Element, 2002 Annual Report.  

SciTech Connect (OSTI)

On November 20, 1991, the National Oceanic Atmospheric Administration listed Snake River sockeye salmon Oncorhynchus nerka as endangered under the Endangered Species Act of 1973. In 1991, the Shoshone-Bannock Tribes and Idaho Department of Fish and Game initiated the Snake River Sockeye Salmon Sawtooth Valley Project to conserve and rebuild populations in Idaho. Restoration efforts are focusing on Redfish, Pettit, and Alturas lakes within the Sawtooth Valley. The first release of hatchery-produced juvenile sockeye salmon from the captive broodstock program occurred in 1994. The first anadromous adult returns from the captive broodstock program were recorded in 1999 when six jacks and one jill were captured at IDFG's Sawtooth Fish Hatchery. In 2002, progeny from the captive broodstock program were released using four strategies: age-0 presmolts were released to Alturas, Pettit, and Redfish lakes in August and to Pettit and Redfish lakes in October, age-1 smolts were released to Redfish Lake Creek in May, eyed-eggs were planted in Pettit Lake in December, and hatchery-produced and anadromous adult sockeye salmon were released to Redfish Lake for volitional spawning in September. Oncorhynchus nerka population monitoring was conducted on Redfish, Alturas, and Pettit lakes using a midwater trawl in September 2002. Age-0, age-1, and age-2 O. nerka were captured in Redfish Lake, and population abundance was estimated at 50,204 fish. Age-0, age-1, age-2, and age-3 kokanee were captured in Alturas Lake, and population abundance was estimated at 24,374 fish. Age-2 and age-3 O. nerka were captured in Pettit Lake, and population abundance was estimated at 18,328 fish. The ultimate goal of the Idaho Department of Fish and Game (IDFG) captive broodstock development and evaluation efforts is to recover sockeye salmon runs in Idaho waters. Recovery is defined as reestablishing sockeye salmon runs and providing for utilization of sockeye salmon and kokanee resources by anglers. The immediate project goal is to maintain this unique sockeye salmon population through captive broodstock technology and avoid species extinction. The project objectives are: (1) Develop captive broodstocks from Redfish Lake anadromous sockeye salmon. (2) Determine the contribution hatchery-produced sockeye salmon make toward avoiding population extinction and increasing population abundance. (3) Describe O. nerka population characteristics for Sawtooth Valley lakes in relation to carrying capacity and broodstock program supplementation efforts. (4) Refine our ability to discern the origin of wild and broodstock sockeye salmon to provide maximum effectiveness in their utilization within the broodstock program. (5) Transfer technology through participation in the technical oversight committee process, providing written activity reports and participation in essential program management and planning activities.

Willard, Catherine; Hebdon, J. Lance; Castillo, Jason (Idaho Department of Fish and Game, Boise, ID)

2004-06-01T23:59:59.000Z

3

Snake River Sockeye Salmon Captive Broodstock Program : Hatchery Element : Annual Progress Report, 2000.  

SciTech Connect (OSTI)

On November 20, 1991, the National Marine Fisheries Service listed Snake River sockeye salmon Oncorhynchus nerka as endangered under the Endangered Species Act of 1973. In 1991, the Idaho Department of Fish and Game, the Shoshone-Bannock Tribes, and the National Marine Fisheries Service initiated efforts to conserve and rebuild populations in Idaho. Initial steps to recover sockeye salmon included the establishment of a captive broodstock program at the Idaho Department of Fish and Game Eagle Fish Hatchery. Sockeye salmon broodstock and culture responsibilities are shared with the National Marine Fisheries Service at two locations adjacent to Puget Sound in Washington State. Activities conducted by the Shoshone-Bannock Tribes and the National Marine Fisheries Service are reported under separate cover. Idaho Department of Fish and Game monitoring and evaluation activities of captive broodstock program fish releases are also reported under separate cover. Captive broodstock program activities conducted between January 1, 2000 and December 31, 2000 are presented in this report.

Kline, Paul A.; Willard, Catherine

2001-04-01T23:59:59.000Z

4

Snake River Sockeye Salmon Captive Broodstock Program; Hatchery Element, 2001 Annual Report.  

SciTech Connect (OSTI)

On November 20, 1991, the National Marine Fisheries Service listed Snake River sockeye salmon Oncorhynchus nerka as endangered under the Endangered Species Act of 1973. In 1991, the Idaho Department of Fish and Game, the Shoshone-Bannock Tribes, and the National Marine Fisheries Service initiated efforts to conserve and rebuild populations in Idaho. Initial steps to recover sockeye salmon included the establishment of a captive broodstock program at the Idaho Department of Fish and Game Eagle Fish Hatchery. Sockeye salmon broodstock and culture responsibilities are shared with the National Marine Fisheries Service at two locations adjacent to Puget Sound in Washington State. Activities conducted by the Shoshone-Bannock Tribes and the National Marine Fisheries Service are reported under separate cover. Idaho Department of Fish and Game monitoring and evaluation activities of captive broodstock program fish releases (annual report to the Bonneville Power Administration for the research element of the program) are also reported separately. Captive broodstock program activities conducted between January 1, 2001 and December 31, 2001 for the hatchery element of the program are presented in this report. In 2001, 26 anadromous sockeye salmon returned to the Sawtooth Basin. Twenty-three of these adults were captured at adult weirs located on the upper Salmon River and on Redfish Lake Creek. Three of the anadromous sockeye salmon that returned were observed below the Sawtooth Fish Hatchery weir and allowed to migrate upstream volitionally (following the dismantling of the weir on October 12, 2001). Nine anadromous adults were incorporated into the captive broodstock program spawning design in 2001. The remaining adults were released to Redfish Lake for natural spawning. Based on their marks, returning adult sockeye salmon originated from a variety of release options. Two sockeye salmon females from the anadromous group and 152 females from the brood year 1998 captive broodstock group were spawned at the Eagle Hatchery in 2001. Spawn pairings produced approximately 118,121 eyed-eggs with egg survival to eyed stage of development averaging 42.0%. Presmolts (106,166), smolts (13,915), and adults (79) were planted or released into Stanley Basin waters in 2001. Supplementation strategies involved releases to Redfish Lake, Redfish Lake Creek, Alturas Lake, and Pettit Lake. During this reporting period, five broodstocks and two unique production groups were in culture at Idaho Department of Fish and Game facilities (Eagle Fish Hatchery and Sawtooth Fish Hatchery). Two of the five broodstocks were incorporated into the 2001 spawning design, and one broodstock was terminated following the completion of spawning.

Kline, Paul A.; Willard, Catherine; Baker, Dan J. (Idaho Department of Fish and Game, Boise, ID)

2003-08-01T23:59:59.000Z

5

Snake River Sockeye Salmon Captive Broodstock Program; Hatchery Element, 1997 Annual Report.  

SciTech Connect (OSTI)

On November 20, 1991, the National Marine Fisheries Service listed Snake River sockeye salmon Oncorhynchus nerka as endangered under the Endangered Species Act of 1973. In 1991, the Idaho Department of Fish and Game, the Shoshone-Bannock Tribes, and the National Marine Fisheries Service initiated efforts to conserve and rebuild populations in Idaho. Initial steps to recover sockeye salmon included the establishment of a captive broodstock program at the Idaho Department of Fish and Game Eagle Fish Hatchery. Sockeye salmon broodstock and culture responsibilities are shared with the National Marine Fisheries Service at two locations adjacent to Puget Sound in Washington State. Activities conducted by the Shoshone-Bannock Tribes and the National Marine Fisheries Service are reported under separate cover. Idaho Department of Fish and Game monitoring and evaluation activities of captive broodstock program fish releases (annual report to the Bonneville Power Administration for the research element of the program) are also reported under separate cover. Captive broodstock program activities conducted between January 1, 1997 and December 31, 1997 are presented in this report. One hundred twenty-six female sockeye salmon from one captive broodstock group were spawned at the Eagle Fish Hatchery in 1997. Successful spawn pairings produced approximately 148,781 eyed-eggs with a cumulative mean survival to eyed-egg rate of 57.3%. Approximately 361,600 sockeye salmon were released to Sawtooth basin waters in 1997. Reintroduction strategies included eyed-eggs (brood year 1997), presmolts (brood year 1996), and prespawn adults for volitional spawning (brood year 1994). Release locations included Redfish Lake, Alturas Lake, and Pettit Lake. During this reporting period, four broodstocks and two unique production groups were in culture at the Eagle Fish Hatchery. Two of the four broodstocks were incorporated into the 1997 spawning design, and one broodstock was terminated following the completion of spawning.

Kline, Paul A.; Heindel, Jeff A.; Willard, Catherine (Idaho Department of Fish and Game, Boise, ID)

2003-08-01T23:59:59.000Z

6

Snake River Sockeye Salmon Captive Broodstock Program; Hatchery Element, 1999 Annual Report.  

SciTech Connect (OSTI)

On November 20, 1991, the National Marine Fisheries Service listed Snake River sockeye salmon Oncorhynchus nerka as endangered under the Endangered Species Act of 1973. In 1991, the Idaho Department of Fish and Game, the Shoshone-Bannock Tribes, and the National Marine Fisheries Service initiated efforts to conserve and rebuild populations in Idaho. Initial steps to recover sockeye salmon included the establishment of a captive broodstock program at the Idaho Department of Fish and Game Eagle Fish Hatchery. Sockeye salmon broodstock and culture responsibilities are shared with the National Marine Fisheries Service at two locations adjacent to Puget Sound in Washington State. Activities conducted by the Shoshone-Bannock Tribes and the National Marine Fisheries Service are reported under separate cover. Idaho Department of Fish and Game monitoring and evaluation activities of captive broodstock program fish releases are also reported under separate cover. Captive broodstock program activities conducted between January 1, 1999 and December 31, 1999 are presented in this report. In 1999, seven anadromous sockeye salmon returned to the Sawtooth Valley and were captured at the adult weir located on the upper Salmon River. Four anadromous adults were incorporated in the captive broodstock program spawning design for year 1999. The remaining three adults were released to Redfish Lake for natural spawning. All seven adults were adipose and left ventral fin-clipped, indicating hatchery origin. One sockeye salmon female from the anadromous group and 81 females from the captive broodstock group were spawned at the Eagle Fish Hatchery in 1999. Spawn pairings produced approximately 63,147 eyed-eggs with egg survival to eyed-stage of development averaging 38.97%. Eyed-eggs (20,311), presmolts (40,271), smolts (9,718), and adults (21) were planted or released into Sawtooth Valley waters in 1999. Supplementation strategies involved releases to Redfish Lake, Redfish Lake Creek, upper Salmon River (below the Sawtooth Fish Hatchery weir), Alturas Lake, and Pettit Lake. During this reporting period, four broodstocks and three production groups were in culture at the Eagle Fish Hatchery. Two of the four broodstocks were incorporated into the 1999 spawning design and one broodstock was terminated following the completion of spawning.

Baker, Dan J,; Heindel, Jeff A.; Kline, Paul A. (Idaho Department of Fish and Game, Boise, ID)

2005-08-01T23:59:59.000Z

7

Snake River Sockeye Salmon Captive Broodstock; Research Element, 1993 Annual Report.  

SciTech Connect (OSTI)

In 1991, the National Marine Fisheries Service listed Snake River sockeye salmon Oncorhynchus nerka as endangered under the Endangered Species Act of 1973. Initial steps to recover the species include the establishment of captive broodstocks at the Eagle Fish Hatchery in Eagle, Idaho. Research and recovery activities for sockeye conducted by the Idaho Department of Fish and Game during the period of April 1993 to April 1994 are covered by this report. Eight anadromous adults (two female and six male) returned to the Redfish Lake Creek trap this year and were spawned at the Sawtooth Hatchery near Stanley, Idaho. Fecundity was 3160 for each female. The mean fertilization rate was 52% for female {open_quotes}A{close_quotes} and 65% for female {open_quotes}B.{close_quotes} Captive broodstock also spawned as well as residual sockeye captured in a Merwin trap in Redfish Lake. Spawning data from 72 fish spawned during this period is included in this report. Captive broodstock also matured later than normal (winter and spring 1994). Fish were spawned and samples were taken to investigate reasons for poor fertilization rates. Twenty-four out migrants of 1991 were selected for return to Redfish Lake for volitional spawning. Releases were made in August of 1993. All fish were implanted with sonic tags and tracking of this group began soon after the release to identify spawning-related activities. A research project is being conducted on captive broodstock diets. The project will investigate the effect of diet modification on spawn timing, gamete quality, and fertilization rates. A second project used ultrasound to examine fish for sexual maturity. The goal was to obtain a group a fish to be released f or volitional spawning. A total of 44 fish were found to be mature. The performance of all captive groups held at Eagle are included in this report.

Johnson, Keith A.

1995-12-01T23:59:59.000Z

8

Snake River Sockeye Salmon Captive Broodstock Program; Hatchery Element, 2004 Annual Report.  

SciTech Connect (OSTI)

On November 20, 1991, the National Marine Fisheries Service listed Snake River sockeye salmon Oncorhynchus nerka as endangered under the Endangered Species Act of 1973. In 1991, the Idaho Department of Fish and Game, the Shoshone-Bannock Tribes, and the National Marine Fisheries Service initiated efforts to conserve and rebuild populations in Idaho. Initial steps to recover sockeye salmon included the establishment of a captive broodstock program at the Idaho Department of Fish and Game Eagle Fish Hatchery. Sockeye salmon broodstock and culture responsibilities are shared with the National Oceanic and Atmospheric Administration at two locations adjacent to Puget Sound in Washington State. Activities conducted by the Shoshone-Bannock Tribes and the National Oceanic and Atmospheric Administration are reported under separate cover. Idaho Department of Fish and Game monitoring and evaluation activities of captive broodstock program fish releases (annual report to the Bonneville Power Administration for the research element of the program) are also reported separately. Captive broodstock program activities conducted between January 1, 2004 and December 31, 2004 for the hatchery element of the program are presented in this report. In 2004, twenty-seven anadromous sockeye salmon returned to the Sawtooth Valley. Traps on Redfish Lake Creek and the upper Salmon River at the Sawtooth Fish Hatchery intercepted one and four adults, respectively. Additionally, one adult sockeye salmon was collected at the East Fork Salmon River weir, 18 were seined from below the Sawtooth Fish Hatchery weir, one adult sockeye salmon was observed below the Sawtooth Fish Hatchery weir but not captured, and two adult sockeye salmon were observed in Little Redfish Lake but not captured. Fish were captured/collected between July 24 and September 14, 2004. The captured/collected adult sockeye salmon (12 females and 12 males) originated from a variety of release strategies and were transferred to Eagle Fish Hatchery on September 14, 2004 and later incorporated into hatchery spawn matrices. Nine anadromous females, 102 captive females from brood year 2001, and one captive female from brood year 2000 broodstock groups were spawned at the Eagle Hatchery in 2004. Spawn pairings produced approximately 140,823 eyed-eggs with egg survival to eyed stage of development averaging 72.8%. Eyed-eggs (49,134), presmolts (130,716), smolts (96), and adults (241) were planted or released into Sawtooth Valley waters in 2004. Reintroduction strategies involved releases to Redfish Lake, Alturas Lake, and Pettit Lake. During this reporting period, five broodstocks and five unique production groups were in culture at Idaho Department of Fish and Game (Eagle Fish Hatchery and Sawtooth Fish Hatchery) and Oregon Department of Fish and Wildlife (Oxbow Fish Hatchery) facilities. Two of the five broodstocks were incorporated into the 2004 spawning design.

Baker, Dan J.; Heindel, Jeff A.; Redding, Jeremy (Idaho Department of Fish and Game, Boise, ID)

2006-05-01T23:59:59.000Z

9

Snake River Sockeye Salmon Captive Broodstock Program Research Elements : 2007 Annual Project Progess Report.  

SciTech Connect (OSTI)

On November 20, 1991, the National Oceanic Atmospheric Administration listed Snake River sockeye salmon Oncorhynchus nerka as endangered under the Endangered Species Act of 1973. In 1991, the Shoshone-Bannock Tribes (SBT) and Idaho Department of Fish and Game (IDFG) initiated the Snake River Sockeye Salmon Captive Broodstock Program to conserve and rebuild populations in Idaho. Restoration efforts are focused on Redfish, Pettit, and Alturas lakes within the Sawtooth Valley. The first release of hatchery-produced adults occurred in 1993. The first release of juvenile sockeye salmon from the captive broodstock program occurred in 1994. In 1999, the first anadromous adult returns from the captive broodstock program were recorded when six jacks and one jill were captured at the IDFG Sawtooth Fish Hatchery. In 2007, progeny from the captive broodstock program were released using four strategies: (1) eyed-eggs were planted in Pettit Lake in November; (2) age-0 presmolts were released to Alturas, Pettit, and Redfish lakes in October; (3) age-1 smolts were released into Redfish Lake Creek and the upper Salmon River in May; and (4) hatchery-produced adult sockeye salmon were released to Redfish Lake for volitional spawning in September. Oncorhynchus nerka population monitoring was conducted on Redfish, Alturas, and Pettit lakes using a midwater trawl in September 2007. Population abundances were estimated at 73,702 fish for Redfish Lake, 124,073 fish for Alturas Lake, and 14,746 fish for Pettit Lake. Angler surveys were conducted from May 26 through August 7, 2007 on Redfish Lake to estimate kokanee harvest. On Redfish Lake, we interviewed 102 anglers and estimated that 56 kokanee were harvested. The calculated kokanee catch rate was 0.03 fish/hour for each kokanee kept. The juvenile out-migrant trap on Redfish Lake Creek was operated from April 14 to June 13, 2007. We estimated that 5,280 natural origin and 14,256 hatchery origin sockeye salmon smolts out-migrated from Redfish Lake in 2007. The hatchery origin component originated from a 2006 fall presmolt direct-release. The juvenile out-migrant traps on Alturas Lake Creek and Pettit Lake Creek were operated by the SBT from April 19 to May 23, 2007 and April 18 to May 29, 2007, respectively. The SBT estimated 1,749 natural origin and 4,695 hatchery origin sockeye salmon smolts out-migrated from Pettit Lake and estimated 8,994 natural origin and 6,897 hatchery origin sockeye salmon smolts out-migrated from Alturas Lake in 2007. The hatchery origin component of sockeye salmon out-migrants originated from fall presmolt direct-releases made to Pettit and Alturas lakes in 2006. In 2007, the Stanley Basin Sockeye Technical Oversight Committee (SBSTOC) chose to have all Snake River sockeye salmon juveniles (tagged and untagged) transported due to potential enhanced survival. Therefore, mainstem survival evaluations were only conducted to Lower Granite Dam. Unique PIT tag interrogations from Sawtooth Valley juvenile out-migrant traps to Lower Granite Dam were utilized to estimate survival rates for out-migrating sockeye salmon smolts. Survival rate comparisons were made between smolts originating from Redfish, Alturas, and Pettit lakes and the various release strategies. Alturas Lake hatchery origin smolts tagged at the out-migrant trap recorded the highest survival rate of 78.0%. In 2007, 494 hatchery origin adult sockeye salmon were released to Redfish Lake for natural spawning. We observed 195 areas of excavation in the lake from spawning events. This was the highest number of redds observed in Redfish Lake since the program was initiated. Suspected redds were approximately 3 m x 3 m in size and were constructed by multiple pairs of adults. To monitor the predator population found within the lakes, we monitored bull trout spawning in Fishhook Creek, a tributary to Redfish Lake; and in Alpine Creek, a tributary to Alturas Lake. This represented the tenth consecutive year that the index reaches have been surveyed on these two streams. Adult counts (41 adults) and redd counts (22 redds

Peterson, Mike; Plaster, Kurtis; Redfield, Laura; Heindel, Jeff; Kline, Paul

2008-12-17T23:59:59.000Z

10

Snake River Sockeye Salmon Captive Broodstock Program; Research Element, 2003 Annual Report.  

SciTech Connect (OSTI)

On November 20, 1991, the National Oceanic Atmospheric Administration listed Snake River sockeye salmon Oncorhynchus nerka as endangered under the Endangered Species Act of 1973. In 1991, the Shoshone-Bannock Tribes (SBT) and Idaho Department of Fish and Game (IDFG) initiated the Snake River Sockeye Salmon Captive Broodstock Program to conserve and rebuild populations in Idaho. Restoration efforts are focused on Redfish, Pettit, and Alturas lakes within the Sawtooth Valley. The first release of hatchery-produced adults occurred in 1993. The first release of juvenile sockeye salmon from the captive broodstock program occurred in 1994. In 1999, the first anadromous adult returns from the captive broodstock program were recorded when six jacks and one jill were captured at the IDFG Sawtooth Fish Hatchery. In 2003, progeny from the captive broodstock program were released using three strategies: eyed-eggs were planted in Pettit and Alturas lakes in November and December, age-0 presmolts were released to Alturas, Pettit, and Redfish lakes in October, and hatchery-produced adult sockeye salmon were released to Redfish Lake for volitional spawning in September. Oncorhynchus nerka population monitoring was conducted on Redfish, Alturas, and Pettit lakes using a midwater trawl in September 2003. Age-0 through age-4 O. nerka were captured in Redfish Lake, and population abundance was estimated at 81,727 fish. Age-0 through age-3 O. nerka were captured in Alturas Lake, and population abundance was estimated at 46,234 fish. Age-0 through age-3 O. nerka were captured in Pettit Lake, and population abundance was estimated at 11,961 fish. Angler surveys were conducted from May 25 through August 7, 2003 on Redfish Lake to estimate kokanee harvest. On Redfish Lake, we interviewed 179 anglers and estimated that 424 kokanee were harvested. The calculated kokanee catch rate was 0.09 fish/hour. The juvenile out-migrant trap on Redfish Lake Creek was operated from April 15 to May 29, 2003. We estimated that 4,637 wild/natural and 12,226 hatchery-produced sockeye salmon smolts out-migrated from Redfish Lake in 2003. The hatchery-produced component included an estimated 5,352 out-migrants produced from a summer direct-release made to Redfish Lake in 2002 and 6,874 out-migrants produced from a fall direct-release made in 2002. The juvenile out-migrant traps on Alturas Lake Creek and Pettit Lake Creek were operated by the SBT from April 23 to June 5, 2003 and April 25 to June 4, 2003, respectively. The SBT enumerated 28 wild/natural and 13,329 hatchery-produced sockeye salmon smolts that outmigrated from Pettit Lake and estimated 286 wild/natural and 553 hatchery-produced sockeye salmon smolts out-migrated from Alturas Lake in 2003. The hatchery-produced component of sockeye salmon out-migrants originated from presmolt releases made directly to Pettit and Alturas lakes in 2002. Median travel times for passive integrated transponder (PIT) tagged smolts from the Redfish Lake Creek trap site to Lower Granite Dam were estimated for wild/natural smolts and hatchery-produced smolts. Median travel times for smolts originating from the Redfish Lake Creek trap were 10.6 d for wild/natural smolts, 6.2 d for summer direct-released smolts, and 7.1 d for fall direct-released smolts. Median travel times for PIT-tagged smolts from the Pettit Lake Creek trap site to Lower Granite Dam were estimated for hatchery-produced smolts. Median travel times for smolts originating from the Pettit Lake Creek trap were 14.1 d for fall direct released smolts and 13.6 d for fall direct released smolts. Cumulative unique PIT tag interrogations from Sawtooth Valley juvenile out-migrant traps to mainstem Snake and Columbia river dams were utilized to estimate detection rates for out-migrating sockeye salmon smolts. Detection rate comparisons were made between smolts originating from Redfish, Alturas, and Pettit lakes and the various release strategies. Pettit Lake fall direct released smolts recorded the highest detection rate of 37.14%. In 2003, 312 hatchery-produced adult socke

Willard, Catherine; Plaster, Kurtis; Castillo, Jason (Idaho Department of Fish and Game, Boise, ID)

2005-01-01T23:59:59.000Z

11

Snake River Sockeye Salmon Captive Broodstock Program; Research Element, 2001 Annual Report.  

SciTech Connect (OSTI)

On November 20, 1991, the National Marine Fisheries Service listed Snake River sockeye salmon Oncorhynchus nerka as endangered under the Endangered Species Act of 1973. In 1991, the Shoshone-Bannock Tribes and Idaho Department of Fish and Game initiated the Snake River Sockeye Salmon Sawtooth Valley Project to conserve and rebuild populations in Idaho. Restoration efforts are focusing on Redfish, Pettit, and Alturas lakes within the Sawtooth Valley. The first release of hatchery-produced juvenile sockeye salmon from the captive broodstock program occurred in 1994. The first anadromous adult returns from the captive broodstock program were recorded in 1999, when six jacks and one jill were captured at Idaho Department of Fish and Game's Sawtooth Fish Hatchery. In 2001, progeny from the captive broodstock program were released using four strategies: age-0 presmolts were released to all three lakes in October and to Pettit and Alturas lakes in July; age-1 smolts were released to Redfish Lake Creek, and hatchery-produced adult sockeye salmon were released to Redfish Lake for volitional spawning in September along with anadromous adult sockeye salmon that returned to the Sawtooth basin and were not incorporated into the captive broodstock program. Kokanee population monitoring was conducted on Redfish, Alturas, and Pettit lakes using a midwater trawl in September. Only age-0 and age-1 kokanee were captured on Redfish Lake, resulting in a population estimate of 12,980 kokanee. This was the second lowest kokanee abundance estimated since 1990. On Alturas Lake age-0, age-1, and age-2 kokanee were captured, and the kokanee population was estimated at 70,159. This is a mid range kokanee population estimate for Alturas Lake, which has been sampled yearly since 1990. On Pettit Lake only age-1 kokanee were captured, and the kokanee population estimate was 16,931. This estimate is in the midrange of estimates of the kokanee population in Pettit Lake, which has been sampled yearly since 1992. We continue to have difficulty capturing age-0 kokanee in the midwater trawl on Pettit Lake. Angler surveys were conducted on Redfish and Alturas lakes to estimate kokanee harvest and to estimate return to creel for hatchery rainbow trout planted in Alturas Lake. We failed to encounter any kokanee that had been harvested in 88 angler interviews conducted between May 26 and August 7, resulting in an estimated kokanee harvest of zero. On Alturas Lake, we again failed to encounter any harvested kokanee in 116 angler interviews, resulting in an estimated kokanee harvest of zero. We estimated that anglers harvested 9.5% of the 6,598 rainbow trout planted in Alturas Lake. We estimated that 110 wild/natural and 9,616 hatchery-produced sockeye salmon smolts out-migrated from Redfish Lake in 2001. This was the lowest estimate of unmarked smolt out-migration since monitoring began in 1991. The trap on Redfish Lake Creek was operated from April 22 to June 6, 2001 to estimate out-migration. Mean travel times for PIT-tagged smolts from Redfish Lake Creek Trap to Lower Granite Dam was 10.3 days for wild/natural smolts and 10.6 days for hatchery-produced smolts. Based on cumulative unique PIT tag interrogations from Sawtooth basin traps to mainstem Snake and Columbia river dams, the Redfish Lake wild/natural smolts, Redfish fall direct presmolts group, and Alturas Lake fall direct presmolts recorded the highest detection rates. In 2001, 65 hatchery-raised and 14 anadromous adult sockeye salmon were released to Redfish Lake for natural spawning. We observed 12 to 15 areas of excavation in the lake that were possible redds. We monitored bull trout spawning on Fishhook Creek, a tributary to Redfish Lake, and on Alpine Creek, a tributary to Alturas Lake. This represented the fourth consecutive year that the index reaches have been surveyed on these two streams. Adult counts on Fishhook Creek were similar to previous years as were redd counts. On Alpine Creek, bull trout numbers were also similar to previous years, but the number of redds observed increased over prev

Hebdon, J. Lance; Castillo, Jason; Willard, Catherine (Idaho Department of Fish and Game, Boise, ID)

2003-12-01T23:59:59.000Z

12

Snake River Sockeye Salmon Habitat and Limnological Research : 2008 Annual Progress Report.  

SciTech Connect (OSTI)

In March 1990, the Shoshone-Bannock Tribes petitioned the National Marine Fisheries Service (NMFS) to list Snake River sockeye salmon (Oncorhynchus nerka) as endangered. Snake River sockeye salmon were officially listed as endangered in November 1991 under the Endangered Species Act (56 FR 58619). In 1991, the Snake River Sockeye Salmon Habitat and Limnological Research Project was implemented. This project is part of an interagency effort to prevent the extinction of the Redfish Lake stock of Snake River sockeye salmon. The Shoshone-Bannock Tribal goal for this project is two tiered: the immediate goal is to increase the population of Snake River sockeye salmon while preserving the unique genetic characteristics of the evolutionarily significant unit (ESU). The Tribes long term goal is to maintain a viable population that warrants delisting and provides Tribal harvest opportunities. The Bonneville Power Administration (BPA) provides funding for this interagency Recovery effort. Collaborators in the recovery effort include the National Oceanic and Atmospheric Administration (NOAA), the Idaho Department of Fish and Game (IDFG), the University of Idaho (UI), and the Shoshone-Bannock Tribes (SBT). This report summarizes activities conducted by Shoshone-Bannock Tribal Fisheries Department personnel during the 2008 calendar year. Project tasks include: (1) monitor limnological parameters of the Sawtooth Valley lakes to assess lake productivity; (2) conduct lake fertilization in Pettit and Alturas lakes; (3) reduce the number of mature kokanee salmon spawning in Alturas Lake Creek; (4) monitor, enumerate, and evaluate sockeye salmon smolt migration from Pettit and Alturas lakes; (5) monitor spawning kokanee salmon escapement and estimate fry recruitment in Fishhook and Alturas Lake creeks; (6) conduct sockeye and kokanee salmon population surveys; (7) evaluate potential competition and predation between stocked juvenile sockeye salmon and a variety of fish species in Redfish, Pettit, and Alturas lakes; and (8) assist IDFG with captive broodstock production activities.

Kohler, Andre E. [Shoshone-Bannock Tribes; Griswold, Robert G. [Biolines Environmental Consulting; Taki, Doug [Shoshone-Bannock Tribes

2009-07-31T23:59:59.000Z

13

Snake River Sockeye Salmon Habitat and Limnological Research; 2002 Annual Report.  

SciTech Connect (OSTI)

In March 1990, the Shoshone-Bannock Tribes petitioned the National Marine Fisheries Service (NMFS) to list the Snake River sockeye salmon (Oncorhynchus nerka) as endangered. As a result of that petition the Snake River sockeye salmon was officially listed as endangered in November 1991 under the Endangered Species Act (56 FR 58619). In 1991, the Snake River Sockeye Salmon Habitat and Limnological Research Program was implemented (Project Number 91-71, Intergovernmental Contract Number DE-BI79-91bp22548). This project is part of an interagency effort to prevent the extinction of the Redfish Lake stock of O. nerka. The Shoshone-Bannock Tribal goal for this project is two tiered: The immediate goal is to increase the population of Snake River sockeye salmon while preserving the unique genetic characteristics of the Evolutionarily Significant Unit (ESU). The Tribes long term goal is to maintain a viable population that warrants delisting and provides Tribal harvest opportunities. The Bonneville Power Administration (BPA) provides funding for this interagency recovery program through the Northwest Power Planning Council Fish and Wildlife Program (NPPCFWP). Collaborators in the recovery effort include the National Marine Fisheries Service (NMFS), the Idaho Department of Fish and Game (IDFG), the University of Idaho (UI), U.S. Forest Service (USFS), and the Shoshone-Bannock Tribe (SBT). This report summarizes activities conducted by Shoshone-Bannock Tribal Fisheries Department personnel during the 2002 calendar year. Project objectives include: (1) monitor over-winter survival and emigration of juvenile anadromous O. nerka stocked from the captive rearing program; (2) fertilize Redfish Lake (3) conduct kokanee salmon (non-anadromous O. nerka) population surveys; (4) monitor spawning kokanee escapement and estimate fry recruitment on Fishhook, Alturas Lake, and Stanley Lake creeks; (5) evaluate potential competition and predation between stocked juvenile O. nerka and a variety of fish species in Redfish, Pettit, and Alturas lakes; and (6) monitor limnological parameters of Sawtooth Valley lakes to assess lake productivity.

Kohler, Andre E.; Taki, Doug (Shoshone-Bannock Tribes, Fort Hall, ID); Griswold, Robert G. (Biolines, Stanley, ID)

2004-08-01T23:59:59.000Z

14

Snake River Sockeye Salmon Habitat and Limnological Research; 2001 Annual Report.  

SciTech Connect (OSTI)

In March 1990, the Shoshone-Bannock Tribes petitioned the National Marine Fisheries Service (NMFS) to list the Snake River sockeye salmon Oncorhynchus nerka as endangered. As a result of that petition the Snake River sockeye salmon was officially listed as endangered in November 1991 under the Endangered Species Act (56 FR 58619). In 1991, the Snake River Sockeye Salmon Habitat and Limnological Research Program was implemented (Project Number 91-71, Intergovernmental Contract Number DE-BI79-91bp22548). This project is part of an interagency effort to prevent the extinction of the Redfish Lake stock of O. nerka. The Bonneville Power Administration (BPA) provides funding for this interagency recovery program through the Northwest Power Planning Council Fish and Wildlife Program (Council). Collaborators in the recovery effort include the National Marine Fisheries Service (NMFS), the Idaho Department of Fish and Game (IDFG), the University of Idaho (UI), U.S. Forest Service (USFS), and the Shoshone-Bannock Tribe (SBT). This report summarizes activities conducted by Shoshone-Bannock Tribal Fisheries Department personnel during the 2001 calendar year. Project objectives include: (1) monitor over-winter survival and emigration of juvenile anadromous O. nerka stocked from the captive rearing program; (2) fertilize Redfish Lake, fertilization of Pettit and Alturas lakes was suspended for this year; (3) conduct kokanee (non-anadromous O. nerka) population surveys; (4) monitor spawning kokanee escapement and estimate fry recruitment on Fishhook, Alturas Lake, and Stanley Lake creeks; (5) evaluate potential competition and predation interactions between stocked juvenile O. nerka and a variety of fish species in Redfish, Pettit, and Alturas lakes; (6) monitor limnological parameters of Sawtooth Valley lakes to assess lake productivity.

Kohler, Andre E.; Taki, Doug (Shoshone-Bannock Tribes, Fort Hall, ID); Griswold, Robert G. (Biolines, Stanley, ID)

2004-08-01T23:59:59.000Z

15

Oxbow Fish Hatchery Snake River Sockeye Salmon Smolt Program, 2008 Annual Report.  

SciTech Connect (OSTI)

This contract proposal is in response to the Federal Columbia River Power System Biological Opinion Implementation Plan/Update Proposed Action (UPA) associated with increasing the number of Snake River sockeye smolts by 150,000. To accomplish this proposal the cooperation and efforts of three government entities has been planned (e.g., Idaho Department of Fish and Game (IDFG), Oregon Department of Fish and Wildlife (ODFW), and the National Marine Fisheries Service (NMFS)). Improvements at the IDFG Eagle Fish Hatchery and NMFS Burley Creek Hatchery will focus on increasing sockeye salmon captive broodstock and egg production. Improvements at the ODFW Oxbow Fish Hatchery will be made to accommodate the incubation, hatching and rearing of 150,000 sockeye salmon smolts for release into Idaho's Sawtooth Valley, Upper Salmon River near IDFG's Sawtooth Fish Hatchery and/or Redfish Lake Creek 1.4 km downstream of Redfish Lake. Modifications to Oxbow Fish Hatchery (ODFW) will include retro-fit existing pond drains so pond cleaning effluent water can be routed to the pollution abatement pond, and modifications to the abatement pond. Also included in this project as an added phase, was the rerouting of the hatchery building effluent water to meet state DEQ guidelines for the use of formalin to treat salmonid eggs. Some additional funding for the described Oxbow Hatchery modifications will come from Mitchell Act Funding. All personnel costs associated with this project will come from Mitchell Act funding. Due to heavy work load issues, being under staffed, and two emergency projects in the spring and summer of 2006, ODFW engineers were not able to complete all plans and get them out for bid in 2006. As a result of these circumstances retro-fitting pond drains and modifications to the abatement pond was carried over into fiscal year 2007-2008. A no cost time extension to the contract was approved by BPA. The format for this report will follow the standard format for Statement of Work Report (SOW), which includes sub-categories Work Element (WE), and within the WE the Milestone Titles.

Banks, Duane D. [Oregon Department of Fish and Wildlife

2009-11-14T23:59:59.000Z

16

Research and Recovery of Snake River Sockeye Salmon, 1994 Annual Report.  

SciTech Connect (OSTI)

On November 20, 1991, the National Marine Fisheries Service listed Snake River sockeye salmon oncorhynchus nerka as endangered under the Endangered Species Act of 1973. In 1991, the Shoshone-Bannock Tribe and the Idaho Department of Fish and Game initiated the Snake River Sockeye Salmon Sawtooth Valley Project to conserve and rebuild populations in Idaho. In 1994, the authors estimated the total September Redfish Lake O. nerka population at 51,529 fish (95% CI, {+-} 33,179). The Alturas Lake O. nerka population was estimated at 5,785 fish ({+-} 6,919). The total density and biomass of Alturas Lake was estimated at 27 fish/hectare ({+-} 33) and 0.7 kg/hectare, respectively. The total O. nerka population estimate for Pettit Lake was 14,743 fish ({+-} 3,683). Stanley Lake O. nerka total population size, density, and biomass was estimated at 2,695 fish ({+-} 963), 37 fish/hectare ({+-} 13), and 0.5 kg/hectare, respectively. Estimated numbers of O. nerka outmigrant smolts passing Redfish Lake Creek and Salmon River trapping sites increased in 1994. The authors estimated 1,820 (90% CI 1,229--2,671) and 945 (90% CI 331--13,000) smolts left Redfish and Alturas lakes, respectively. The total PIT tag detection rate at mainstem dams for Redfish Lake outmigrants was 21% in 1994. No Alturas Lake outmigrants were detected at any of the downstream facilities with detection capabilities (zero of 50 fish).

Kline, Paul A.

1995-08-01T23:59:59.000Z

17

"Research to Improve the Efficacy of Captive Broodstock Programs and Advance Hatchery Reform Throughout the Columbia River Basin." [from the Abstract], 2007-2008 Annual Progress Report.  

SciTech Connect (OSTI)

This project was developed to conduct research to improve the efficacy of captive broodstock programs and advance hatchery reform throughout the Columbia river basin. The project has three objectives: (1) maintain adaptive life history characteristics in Chinook salmon, (2) improve imprinting in juvenile sockeye salmon, and (3) match wild phenotypes in Chinook and sockeye salmon reared in hatcheries. A summary of the results are as follows: Objective 1: Adult and jack Chinook salmon males were stocked into four replicate spawning channels at a constant density (N = 16 per breeding group), but different ratios, and were left to spawn naturally with a fixed number of females (N = 6 per breeding group). Adult males obtained primary access to females and were first to enter the nest at the time of spawning. Jack male spawning occurred primarily by establishing satellite positions downstream of the courting pair, and 'sneaking' into the nest at the time of spawning. Male dominance hierarchies were fairly stable and strongly correlated with the order of nest entry at the time of spawning. Spawning participation by jack and adult males is consistent with a negative frequency dependent selection model, which means that selection during spawning favors the rarer life history form. Results of DNA parentage assignments will be analyzed to estimate adult-to-fry fitness of each male. Objective 2: To determine the critical period(s) for imprinting for sockeye salmon, juvenile salmon were exposed to known odorants at key developmental stages. Molecular assessments of imprinting-induced changes in odorant receptor gene expression indicated that regulation of odorant expression is influenced by developmental status and odor exposure history. The results suggest that sockeye salmon are capable of imprinting to homing cues during the developmental periods that correspond to several of current release strategies employed as part of the Captive Broodstock program (specifically, planting eyed eggs, fall and smolt releases into the lake) appear to be appropriate for successful homing of sockeye in Redfish Lake. Also, our findings indicated that sockeye salmon were capable of olfactory imprinting at multiple life stages and over varying exposure durations. Fish exposed to odors just prior to smolting showed the strongest attraction to the imprinting odor arginine and this period corresponds to the period of highest plasma thyroxine levels and increased BAAR receptor mRNA in juveniles. Objective 3: Spring Chinook salmon were exposed to three different photoperiods and three feed rations at the button-up stage of development. Both photoperiod at emergence and ration post-ponding affected the number of males maturing at age one. Nearly 70% of the males in the early emergence and satiation fed group matured after the first year of rearing, while none of the fish reared on late emergence photoperiod (equivalent to emergence on May 1) matured during this time irrespective of ration treatment. Within the early emergence groups, reducing growth using ration (low or high) appeared to reduce the number of males maturing at age one from 70% to 40-50%. Maturation rates of fish that emerged in a photoperiod equivalent to mid-February (middle emergence) ranged from 10-25%. Together these data indicate that the seasonal timing of fry emergence and growth after ponding can alter life history patterns in spring Chinook salmon. The results imply that hatchery rearing practices that alter seasonal timing of fry emergence can have drastic effects on life history patterns in juvenile Chinook salmon. All three objectives are on-going and will result in recommendations (at the end of the FY 2009 performance period) to advance hatchery reforms in conventional and captive broodstock programs.

Berejikian, Barry A. [National Marine Fisheries Service

2009-04-08T23:59:59.000Z

18

"Research to Improve the Efficacy of Captive Broodstock Programs and Advance Hatchery Reform Throughout the Columbia River Basin." [from the Abstract], 2008-2009 Progress Report.  

SciTech Connect (OSTI)

This project was developed to conduct research to improve the efficacy of captive broodstock programs and advance hatchery reform throughout the Columbia River Basin. The project has three objectives: (1) maintain adaptive life history characteristics in Chinook salmon, (2) improve imprinting in juvenile sockeye salmon, and (3) match wild phenotypes in Chinook and sockeye salmon reared in hatcheries. A summary of the results are as follows: Objective 1: The ratio of jack to adult male Chinook salmon were varied in experimental breeding populations to test the hypothesis that reproductive success of the two male phenotypes would vary with their relative frequency in the population. Adult Chinook salmon males nearly always obtained primary access to nesting females and were first to enter the nest at the time of spawning. Jack male spawning occurred primarily by establishing satellite positions downstream of the courting pair, and 'sneaking' into the nest at the time of spawning. Male dominance hierarchies were fairly stable and strongly correlated with the order of nest entry at the time of spawning. Observed participation in spawning events and adult-to-fry reproductive success of jack and adult males was consistent with a negative frequency-dependent selection model. Overall, jack males sired an average of 21% of the offspring produced across a range of jack male frequencies. Implications of these and additional findings on Chinook salmon hatchery broodstock management will be presented in the FY 2009 Annual Report. Objective 2: To determine the critical period(s) for imprinting for sockeye salmon, juvenile salmon were exposed to known odorants at key developmental stages. Molecular assessments of imprinting-induced changes in odorant receptor gene expression indicated that regulation of odorant expression is influenced by developmental status and odor exposure history. Expression levels of basic amino acid receptor (BAAR) mRNA in the olfactory epithelium increased dramatically during final maturation in both Stanley Basin and Okanogan River sockeye. These increases appeared to be independent of odor exposure history, rising significantly in both arginine-naive and arginine-exposed fish. However, sockeye exposed to arginine during smolting demonstrated a larger increase in BAAR mRNA than arginine-naive fish. These results are consistent with the hypothesis that odorant receptors sensitive to home stream waters may be upregulated at the time of the homing migration and may afford opportunities to exploit this system to experimentally characterize imprinting success and ultimately identify hatchery practices that will minimize straying of artificially produced salmonids. Additional analysis of Sockeye salmon imprinting and further implications of these findings will be presented in the FY 2009 Annual Report. Objective 3: Photoperiod at emergence and ration after ponding were varied in Yakima River spring Chinook salmon to test the hypothesis that seasonal timing of emergence and growth during early stages of development alter seasonal timing of smoltification and age of male maturation. Fish reared under conditions to advance fry emergence and accelerate growth had the greatest variation in seasonal timing of smolting (fall, spring and summer) and highest rates of early male maturation with most males maturing at age 1 (35-40%). In contrast, fish with delayed emergence and slow growth had the least variation in phenotypes with most fish smolting as yearlings in the spring and no age-1 male maturation. Growth (not emergence timing) altered rates of age-2 male maturation. Results of this study demonstrate that altering fry development, as is often done in hatcheries, can profoundly affect later life history transitions and the range of phenotypes within a spring Chinook salmon population. Additional work in the next funding period will determine if these rearing regimes affected other aspects of smolt quality, which may affect ultimate survival upon ocean entry.

Berejikian, Barry A. [National Oceanic and Atmospheric Administration, National Marine Fisheries Service

2009-08-18T23:59:59.000Z

19

Final Environmental Assessment - Idaho Department of Fish and Game Captive Rearing Initiative for Salmon River Chinook Salmon  

Broader source: Energy.gov (indexed) [DOE]

Idaho Department of Fish and Game Captive Rearing Initiative for Salmon River Chinook Salmon Final Environmental Assessment DOE/EA-1301 October 2000 Idaho Department of Fish and Game Captive Rearing Initiative for Salmon River Chinook Salmon Final Environmental Assessment - Need and Purpose for Action Bonneville Power Administration i Contents 1. NEED AND PURPOSE FOR ACTION ..................................................................................1 1.1. Introduction ........................................................................................................................1 1.2. Need for Action ...................................................................................................................1 1.3. Purposes (Decision Factors)...............................................................................................2

20

Final Environmental Assessment - Idaho Department of Fish and Game Captive Rearing Initiative for Salmon River Chinook Salmon  

Broader source: Energy.gov (indexed) [DOE]

Department of Fish and Game Department of Fish and Game Captive Rearing Initiative for Salmon River Chinook Salmon Finding of No Significant Impact October 2000 DEPARTMENT OF ENERGY Bonneville Power Administration Idaho Department of Fish and Game Captive Rearing Initiative for Salmon River Chinook Salmon Finding of No Significant Impact Summary: Bonneville Power Administration (BPA), Department of Energy (DOE), is proposing to fund the Idaho Department of Fish and Game (IDFG) Captive Rearing Initiative for Salmon River Chinook Salmon Program (IDFG Program). The IDFG Program is a small-scale research and production initiative designed to increase numbers of three weak but recoverable populations of spring/summer chinook salmon in the Salmon River drainage. This would increase numbers of spring/summer chinook salmon within the Snake River

Note: This page contains sample records for the topic "river sockeye captive" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

DOE/EA-1326: Tucannon River Spring Chinook Captive Broodstock Program Final Environmental Assessment (05/24/00)  

Broader source: Energy.gov (indexed) [DOE]

TUCANNON RIVER SPRING CHINOOK TUCANNON RIVER SPRING CHINOOK CAPTIVE BROODSTOCK PROGRAM Final Environmental Assessment and Finding of No Significant Impact DOE/EA-1326 B o n n e v i l l e P o w e r A d m i n i s t r a t i o n BONNEVILLE POWER ADMINISTRATION Tucannon River Spring Chinook Captive Broodstock Program Final Environmental Assessment DOE/EA-1326 May 23, 2000 Tucannon River Spring Chinook Captive Broodstock Program PreliminaryFinal Environmental Assessment B o n n e v i l l e P o w e r A d m i n i s t r a t i o n i Table of Contents Page 1. PURPOSE AND NEED FOR ACTION ........................................................................................ 1 1.1 INTRODUCTION ................................................................................................................................ 1 1.2 NEED FOR ACTION ...........................................................................................................................

22

Tucannon River Spring Chinook Captive Broodstock Program Final Environmental Assessment and Finding of No Significant Impact  

SciTech Connect (OSTI)

Bonneville Power Administration (BPA) is proposing to fund the Tucannon River Spring Chinook Captive Broodstock Program, a small-scale production initiative designed to increase numbers of a weak but potentially recoverable population of spring chinook salmon in the Tucannon River in the State of Washington. BPA has prepared an Environmental Assessment (EA) (DOE/EA-l326) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and BPA is issuing this Finding of No Significant Impact (FONSI).

N /A

2000-05-24T23:59:59.000Z

23

Research on Captive Broodstock Programs for Pacific Salmon, 2004-2005 Annual Report.  

SciTech Connect (OSTI)

The success of captive broodstock programs depends on high in-culture survival, appropriate development of the reproductive system, and the behavior and survival of cultured salmon after release, either as adults or juveniles. Continuing captive broodstock research designed to improve technology is being conducted to cover all major life history stages of Pacific salmon. Accomplishments detailed in this report and those since the last project review period (FY 2003) are listed below by major objective. Objective 1: (i) Developed tools for monitoring the spawning success of captively reared Chinook salmon that can now be used for evaluating the reintroduction success of ESA-listed captive broodstocks in their natal habitats. (ii) Developed an automated temperature controlled rearing system to test the effects of seawater rearing temperature on reproductive success of Chinook salmon. Objective 2: (i) Determined that Columbia River sockeye salmon imprint at multiple developmental stages and the length of exposure to home water is important for successful imprinting. These results can be utilized for developing successful reintroduction strategies to minimize straying by ESA-listed sockeye salmon. (ii) Developed behavioral and physiological assays for imprinting in sockeye salmon. Objective 3: (i) Developed growth regime to reduce age-two male maturation in spring Chinook salmon, (ii) described reproductive cycle of returning hatchery Snake River spring Chinook salmon relative to captive broodstock, and (iii) found delays in egg development in captive broodstock prior to entry to fresh water. (iv) Determined that loss of Redfish Lake sockeye embryos prior to hatch is largely due to lack of egg fertilization rather than embryonic mortality. Objective 4 : (i) Demonstrated safety and efficacy limits against bacterial kidney disease (BKD) in fall Chinook of attenuated R. salmoninarum vaccine and commercial vaccine Renogen, (ii) improved prophylactic and therapeutic efficacy of compound vaccine against BKD in fall Chinook and (iii) testing of broodstock antibiotic treatment in combination with compound vaccine against BKD. Objective 5: (i) Determined that close inbreeding in Chinook salmon led to substantial reductions in marine survival; progeny of half siblings survived at 90% the rate of noninbred fish and progeny of full siblings survived at only 15% the rate of noninbred fish. (ii) For two broods, 2002 and 2003, we established a breeding design involving 30 half- and 120 full-sib families of Chinook salmon to test the generality of these results.

Berejikian, Barry A. (National Marine Fisheries Service)

2005-11-01T23:59:59.000Z

24

Stock Assessment of Columbia River Anadromous Salmonids : Final Report, Volume I, Chinook, Coho, Chum and Sockeye Salmon Summaries.  

SciTech Connect (OSTI)

The purpose was to identify and characterize the wild and hatchery stocks of salmon and steelhead in the Columbia River Basin on the basis of currently available information. This report provides a comprehensive compilation of data on the status and life histories of Columbia Basin salmonid stocks.

Howell, Philip J.

1986-07-01T23:59:59.000Z

25

Research on Captive Broodstock Programs for Pacific Salmon, 2001-2002 Annual Report.  

SciTech Connect (OSTI)

In the 2000 Federal Columbia River Power System (FCRPS) Biological Opinion, NMFS identified six populations of steelhead and several salmon populations that had dropped to critically low levels and continue to decline. Following thorough risk-benefit analyses, captive propagation programs for some or all of the steelhead (Oncorhynchus mykiss) populations may be required to reduce the risk of extinction, and more programs may be required in the future. Thus, captive propagation programs designed to maintain or rebuild steelhead populations require intensive and rigorous scientific evaluation, much like the other objectives of BPA Project 1993-056-00 currently underway for chinook (O. tshawytscha) and sockeye salmon (O. nerka). Pacific salmon reared to the adult stage in captivity exhibit poor reproductive performance when released to spawn naturally. Poor fin quality and swimming performance, incomplete development of secondary sex characteristics, changes in maturation timing, and other factors may contribute to reduced spawning success. Improving natural reproductive performance is critical for the success of captive broodstock programs in which adult-release is a primary reintroduction strategy for maintaining ESA-listed populations.

Berejikian, Barry A.; Tezak, E.P. (National Marine Fisheries Service); Endicott, Rick (Long Live the Kings, Seattle, WA)

2002-08-01T23:59:59.000Z

26

Evaluation of an Experimental Re-introduction of Sockeye Salmon into Skaha Lake; Year 1 of 3, 2000 Technical Report.  

SciTech Connect (OSTI)

Historical records indicate that sockeye salmon were once found in most of the lakes in the Okanagan River Basin. Currently, the only sockeye population within the Okanagan River Basin is found in Osoyoos Lake. Abundance of this stock has declined significantly in the last fifty years. The Okanagan Nation and tribes in the U.S. have proposed re-introducing the species into Okanagan Lake, which has a large rearing capacity. However, assessing the potential benefits and risks associated with a reintroduction of sockeye salmon into Okanagan Lake is difficult because of uncertainties about factors that determine production of Okanagan sockeye, and potential interactions with other species in Okanagan Lake. Associated with this proposal are the potential risks of re-introduction of sockeye salmon into Okanagan Lake. One of these is the effects of sockeye on the resident Okanagan Lake kokanee population, which has declined significantly in the past several years because of habitat loss due to human encroachment, competition with introduced mysid shrimp, and the reduction of biological productivity in the lake as municipalities have moved to more complete effluent treatment. Another concern is the possibility of the transmission of diseases that are currently not found in Okanagan and Skaha lakes from re-introduced sockeye to resident fish. An additional concern is the risk that exotic species (e.g. tench, largemouth bass), that have become established in southern Okanagan Lakes (principally as a result of purposeful introductions in the US Columbia/Okanagan river system), may be able to extend their range to Skaha and Okanagan Lakes, through fish ladders provided at the outlets of Vaseaux (McIntyre Dam) and Skaha Lakes (Okanagan Falls Dam), for natural upstream migration of sockeye. A transboundary multi-agency workshop was hosted in November of 1997 to discuss the potential risks and benefits of reintroducing sockeye salmon into Okanagan Lake. These discussions were summarized into a Draft Action Plan that recommended that sockeye be re-introduced to Skaha Lake as an experimental management strategy to resolve some of these uncertainties (Peters et al. 1998). The purpose of this project is to assess the risks and benefits of an experimental reintroduction of sockeye salmon into Skaha Lake. The assessment will be accomplished by completing the following six objectives over three years: (1) Disease Risk Assessment; (2) Exotic species Re-introduction risk Assessment; (3) Inventory of Existing Habitat and Opportunities for Habitat Enhancement; (4) Development of a life-cycle model of Okanagan salmonids, including interaction with resident kokanee; (5) Development of an experimental design and; (6) Finalize a plan for experimental re-introduction of sockeye salmon into Skaha Lake and associated monitoring programs.

Hammell, Larry (University of Prince Edward Island, Atlantic Veterinary College, Charlottetown, PE, Canada); Machin, Deanna; Long, Karilyn (Okanagan National Fisheries Commission, Westbank, BC, Canada)

2001-06-01T23:59:59.000Z

27

Evaluation of Delisting Criteria and Rebuilding Schedules for Snake River Spring/Summer Chinook, Fall Chinook and Sockeye Salmon : Recovery Issues for Threatened and Endangered Snake River Salmon : Technical Report 10 of 11.  

SciTech Connect (OSTI)

We develop a framework for distinguishing healthy and threatened populations, and we analyze specific criteria by which these terms can be measured for threatened populations of salmon in the Snake River. We review reports and analyze existing data on listed populations of salmon in the Snake River to establish a framework for two stages of the recovery process: (1) defining de-listing criteria, and (2) estimating the percentage increase in survival that will be necessary for recovery of the population within specified time frames, given the de-listing criteria that must be achieved. We develop and apply a simplified population model to estimate the percentage improvement in survival that will be necessary to achieve different rates of recovery. We considered five main concepts identifying de-listing criteria: (1) minimum population size, (2) rates of population change, (3) number of population subunits, (4) survival rates, and (5) driving variables. In considering minimum population size, we conclude that high variation in survival rates poses a substantially greater probability of causing extinction than does loss of genetic variation. Distinct population subunits exist and affect both the genetic variability of the population and the dynamics of population decline and growth. We distinguish between two types of population subunits, (1) genetic and (2) geographic, and we give examples of their effects on population recovery.

Cramer, Steven P.; Neeley, Doug

1993-06-01T23:59:59.000Z

28

EA-1913: Springfield Sockeye Hatchery Program, Springfield, Bingham County,  

Broader source: Energy.gov (indexed) [DOE]

13: Springfield Sockeye Hatchery Program, Springfield, Bingham 13: Springfield Sockeye Hatchery Program, Springfield, Bingham County, Idaho EA-1913: Springfield Sockeye Hatchery Program, Springfield, Bingham County, Idaho Summary This EA evaluates the environmental impacts of a proposal by DOE's Bonneville Power Administration to fund the Idaho Department of Fish and Game (IDFG) to modify existing facilities at the Springfield Hatchery, located in Bingham County, Idaho. Public Comment Opportunities None available at this time. Documents Available for Download May 3, 2012 EA-1913: Mitigation Action Plan Springfield Sockeye Hatchery Project, Springfield, Bingham County, Idaho May 3, 2012 EA-1913: Finding of No Significant Impact Springfield Sockeye Hatchery Program, Springfield, Bingham County, Idaho May 3, 2012 EA-1913: Final Environmental Assessment

29

Flying Squirrel Captive  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Flying Squirrel Captive Flying Squirrel Captive Name: Tammy Location: N/A Country: N/A Date: N/A Question: hello there, was looking around the internet for ideas on what to feed my daughters' pet flying squirrel when I happened across your page. When I saw the name Roland F. Eisenbeis, Supt. of Conservation I decided to send an email because my name is also Eisenbeis. My question is what types of fruits and veggies should I feed him and is there anything he should not have? Replies: Hello, I have been taking care of flying squirrels for twenty years as part of our nature center display. We feed our flying squirrels Purina Mouse Chow with an occasional supplement of acorns, when they are available, and/or sunflower seeds. Sunflower seeds can be unhealthy if fed in too large a quantity. The high oil content can lead to hair loss. Also, changes in diet can lead to a loose droppings and a "messy" cage. Avoid feeding large quantities of any fresh foods and only add them a couple times a week, if you do.

30

Spatial Distribution of Juvenile Salmonids in the Hanford Reach, Columbia River  

E-Print Network [OSTI]

Spatial Distribution of Juvenile Salmonids in the Hanford Reach, Columbia River Dennis D. Dauble salmon, sockeye salmon. and steelhead was determined in the Hanford Reach of the Columbia River from July field studies conducted in the Hanford Reach ofthe mid-Columbia River in 1983 and 1984. The Hanford

31

Grande Ronde Basin Chinook Salmon Captive Brood and Conventional Supplementation Program, 2000 Annual Report.  

SciTech Connect (OSTI)

Endangered Species Permit Number 1011 (formerly Permit No. 973) authorizes ODFW to take listed spring chinook salmon juveniles from Catherine Creek (CC), Lostine River (LR) and Grande Ronde River (GR) for research and enhancement purposes. Modification 2 of this permit authorizes ODFW to take adults for spawning and the production and release of smolts for the Captive and Conventional broodstock programs. This report satisfies the requirement that an annual report be submitted. Herein we report on activities conducted and provide cursory data analyses for the Grande Ronde spring chinook salmon Captive and Conventional broodstock projects from 1 January-31 December 2000.

Carmichael, Richard W. (Oregon Department of Fish and Wildlife, La Grande, OR)

2003-03-01T23:59:59.000Z

32

Grande Ronde Basin Chinook Salmon Captive Brood and Conventional Supplementation Programs, 2002 Annual Report.  

SciTech Connect (OSTI)

Endangered Species Permit Number 1011 (formerly Permit No. 973) authorizes ODFW to take listed spring chinook salmon juveniles from Catherine Creek (CC), Lostine River (LR) and Grande Ronde River (GR) for research and enhancement purposes. Modification 2 of this permit authorizes ODFW to take adults for spawning and the production and release of smolts for the Captive and Conventional broodstock programs. This report satisfies the requirement that an annual report be submitted. Herein we report on activities conducted and provide cursory data analyses for the Grande Ronde spring chinook salmon Captive and Conventional broodstock projects from 1 January-31 December 2002. The Grande Ronde Basin Spring Chinook Salmon Captive Broodstock Project is designed to rapidly increase numbers of salmon in stocks that are in imminent danger of extirpation. Parr are captured in Catherine Creek, upper Grande Ronde River and Lostine River and reared to adulthood in captivity. Upon maturation, they are spawned (within stocks) and their progeny reared to smoltification before being released into the natal stream of their parents. This program is co-managed by ODFW, National Marine Fisheries Service, the Nez Perce Tribe and Confederated Tribes of the Umatilla Indian Reservation.

Carmichael, Richard W. (Oregon Department of Fish and Wildlife, La Grande, OR)

2003-07-01T23:59:59.000Z

33

The Chemistry Magic Show Captivates Kids | GE Global Research  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Chemistry Magic Show Captivates Kids The Chemistry Magic Show Captivates Kids Vin Smentkowski 2012.11.16 My colleague, Christopher (Chris) Dosch, also known as Ignito the Magician,...

34

"The Success of Captive Broodstock Programs Depends on High In-Culture Survival, ..." [from the Abstract], 2006-2007 Progress Report.  

SciTech Connect (OSTI)

The success of captive broodstock programs depends on high in-culture survival, appropriate development of the reproductive system, and the behavior and survival of cultured salmon after release, either as adults or juveniles. Continuing captive broodstock research designed to improve technology is being conducted to cover all major life history stages of Pacific salmon. Accomplishments detailed in this report are listed below by major objective. Objective 1: This study documented that captively reared Chinook exhibited spawn timing similar to their founder anadromous population. An analysis of spawn timing data of captively reared Chinook salmon that had received different levels of antibiotic treatment did not suggest that antibiotic treatments during the freshwater or seawater phase of the life cycle affects final maturation timing. No effect of rearing density was found with respect to spawn timing or other reproductive behaviors. Objective 2: This study investigated the critical period(s) for imprinting for sockeye salmon by exposing juvenile salmon to known odorants at key developmental stages. Molecular assessments of imprinting-induced changes in odorant receptor gene expression indicated that regulation of odorant expression differs between coho and sockeye salmon. While temporal patterns differ between these species, exposure to arginine elicited increases in odorant receptor mRNA expression in sockeye salmon. Objective 3: This study: (i) identified the critical period when maturation is initiated in male spring Chinook salmon and when body growth affects onset of puberty, (ii) described changes in the reproductive endocrine system during onset of puberty and throughout spermatogenesis in male spring Chinook salmon, (iii) found that the rate of oocyte development prior to vitellogenesis is related to body growth in female spring Chinook, and (iv) demonstrated that growth regimes which reduce early (age 2) male maturation slow the rate of primary and early secondary oocyte growth, but do not alter number of oocytes at these stages of development. Objective 4 : This study, (1) determined that infected fish treated with oxytetracycline-medicated feed (as fry or as presmolts) had improved survival compared to nonmedicated fish, (2) determined that a single 14-day course of oral azithromycin at first feeding or at the start of smoltification is sufficient for significant azithromycin retention in internal tissues for at least a year, and (3) established that Renibacterium salmoninarum with an azithromycin-resistant phenotype can be isolated from Chinook salmon receiving macrolide antibiotic treatment. Objective 5: This study determined that for Chinook salmon rearing in similar, 'common environment' regimes in seawater, control fish have survived at a higher rate since seawater transfer than have experimentally inbred fish. However, in all groups, the variation among families in survival has been substantial, ranging from 0% to 100% over the entire year and from 0% to 40% since seawater transfer. The highly significant effect of variation among families within both stocks indicates that substantial genetic variation for size remains in these populations.

Berejikian, Barry A. [National Marine Fisheries Service

2009-04-08T23:59:59.000Z

35

Research and Recovery of Snake River Sockeye Salmon, 1993 Annual Report.  

SciTech Connect (OSTI)

Significant changes were made in the fitah rearing facilities at the Idaho Department of Fish and Game's (IDFG) Eagle Hatchery during the contract period. An outside rearing area was enclosed with fence and chicken wire and covered with 70% shade cloth. Seven circular tanks were installed to hold the outmigrante in separate groups while the inside of the hatchery building was modified. The concrete vats were removed and a concrete floor with drains was poured. Twenty 2-m and eight l-m semisquare fiberglass tanks were installed. The original water supply and degassing tower were left intact since they have functioned well. The pump and back-up generator were serviced. Water level sensors were installed for the alarm system, which was linked to the local ADT Security Systems operator to call both staff telephone numbers and pagers. This system has worked well. No photoperiod control has been used to date. At this phase of the project, no attempt to control water temperature was installed. The other option was to move any maturing fish to Sawtooth Fish Hatchery to complete maturation. This was not necessary for the first year of the project. Project security has been increased at Eagle by having the fish culturist and one temporary employee live on-site. This also decreases response time in emergencies. The second requirement for rearing juveniles was to design a rearing protocol and develop sampling protocols for genetics and pathology. The rearing protocol was derived with assistance of the Technical Oversight Committee (TOC), the scientific advisory group, and several fish culturists and nutritionists who were consulted informally. The standards were incorporated into the Research and Propagation Permit from National Marine Fisheries Service (NMFS), which was applied for during this project period (Appendix A). Pathology and genetics samples have been taken and processed from each fish which died during the rearing phase. These have been distributed in a timely manner to the appropriate laboratories at NMFS, University of Idaho, and IDFG.

Kline, Paul A.

1994-11-01T23:59:59.000Z

36

Snake River Sockeye Salmon Update Idaho Department of Fish and Game  

E-Print Network [OSTI]

strategy recommends a phased approach that includes: a. Increased smolt production b. Increased use of F1 the use of "wild" and F1 anadromous adults in the hatchery and in the habitat 3 PDF created with pdf;16 ·The recovery strategy has been defined (IDFG NOAA) · more smolts out · more F1 adults in hatchery

37

Department of Energy Bonneville Power Administration  

E-Print Network [OSTI]

Accord Funds Dear Mr. Schriever: BPA Power Administration (BPA) received the Idaho Department of Fish-607-00 to the Snake River Sockeye Captive Propagation project 2007-402- 00. BPA acknowledges the change in priorities the Biological Opinion. BPA supports of your request to place priority for use of these funds on the Snake River

38

Genetic Variability and Population Differentiation in Captive Baird's Tapirs  

E-Print Network [OSTI]

one of housing and displaying as diverse a collection of species as possible, to one of creating self and Ballou, 1986; Soule et al., 1986]. One obstacle to achieving a self-sustaining captive population- sustaining captive populations that may one day act as a source for restocking wild populations [Ralls

Ashley, Mary V.

39

Columbia River System Operation Review : Final Environmental Impact Statement, Appendix C: Anadromous Fish and Juvenile Fish Transportation.  

SciTech Connect (OSTI)

This Appendix C of the Final Environmental Impact Statement for the Columbia River System discusses impacts on andromous fish and juvenile fish transportation. The principal andromous fish in the Columbia basin include salmonid species (Chinook, coho, and sockeye salmon, and steelhead) and nonsalmoinid andromous species (sturgeon, lamprey, and shad). Major sections in this document include the following: background, scope and process; affected environment for salmon and steelhead, shaded, lamprey, sturgeon; study methods; description of alternatives: qualitative and quantitative findings.

Columbia River System Operation Review (U.S.)

1995-11-01T23:59:59.000Z

40

Skeletochronology and isotopic analysis of a captive individual of Alligator mississippiensis Daudin, 1802  

E-Print Network [OSTI]

) of a femur and three postcranial osteoderms from an approximately 23�25 year-old captive female Alli- gator

Schöne, Bernd R.

Note: This page contains sample records for the topic "river sockeye captive" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

River Thames River Thames  

E-Print Network [OSTI]

West Kent House Penge East Lower Sydenham Forest Hill Honor Oak Park Crofton Park Nunhead New CrossC BD A River Thames River Thames Waterloo & City Southwark Northwood Northwood Hills North Harrow Harrow- on-the-Hill Northwick Park Harrow & Wealdstone Headstone Lane Pinner Kenton Stanmore Canons Park

Delmotte, Nausicaa

42

River Thames River Thames  

E-Print Network [OSTI]

River Thames River Thames Du Cane Road Wood Lane Wood Lane North Pole Road Barlby Road Highlever Street Acton Market Place Acton Horn Lane Wood Lane Du Cane Road Wood Lane South Africa Road White City for BBC Television Centre Wood Lane Ariel Way Wood Lane Shepherd's Bush Green Shepherd's Bush Green

43

"On Behalf of my Comrades": Transnational Private Memories of German Prisoners of War in U.S. Captivity  

E-Print Network [OSTI]

On May 8, 1945 eleven to twelve million Germans experienced the fall of National Socialist Germany while in Allied captivity; four million German soldiers experienced it as captives of the United States. These Germans not ...

Weis, Andrea

2008-08-21T23:59:59.000Z

44

Survival on the ark: life-history trends in captive parrots A. M. Young1  

E-Print Network [OSTI]

demonstrate the value of the ISIS database to estimate life-history data for an at-risk taxonSurvival on the ark: life-history trends in captive parrots A. M. Young1 , E. A. Hobson1 , L 2 International Species Information System, Eagan, MN, USA Keywords captive breeding; ISIS; life-history

Wright, Timothy F.

45

HEART RATE AS A MONITOR FOR METABOLIC RATE IN CAPTIVE JUVENILE STELLER SEA LIONS (EUMETOPIAS JUBATUS)  

E-Print Network [OSTI]

HEART RATE AS A MONITOR FOR METABOLIC RATE IN CAPTIVE JUVENILE STELLER SEA LIONS (EUMETOPIAS COLUMBIA 0Jan M. Mcl'hee, 2001 #12;ABSTRACT The potential use of heart rate to monitor energy expenditure a relationship exists between heart rate @I) and oxygen consumption ( ~ 0 ~ )in captive sea lions while swimming

46

After years of research on captive elephant management in Nepal, UC anthropologist Dr  

E-Print Network [OSTI]

After years of research on captive elephant management in Nepal, UC anthropologist Dr Piers Locke-elephant relations, biodiversity conservation and nature tourism in the Chitwan National Park, in Nepal. During

Hickman, Mark

47

Follicular changes and reproductive hormones in captive white- tailed deer during the breeding season  

E-Print Network [OSTI]

FOLLICULAR CHANGES AND REPRODUCTIVE HORMONES IN CAPTIVE WHITE-TAILED DEER DURING THE RREEDING SEASON A Thesis by TIMOTHY GERARD BIEDIGER Submitted to the Graduate College of Texas ALM University in partial fulfillment of the requirements... for the degree of MASTER OF SCIENCE August 1986 Major Subject: Veterinary Physiology FOLLICULAR CHANGES AND REPRODUCTIVE HORMONES IN CAPTIVE WHITE-TAILED DEER DURING THE BREEDING SEASON A Thesis by TIMOTHY GERARD BIEDIGER Approved as to style and content...

Biediger, Timothy Gerard

2012-06-07T23:59:59.000Z

48

An Assessment of the Status of Captive Broodstock Technology of Pacific Salmon, 1995 Final Report.  

SciTech Connect (OSTI)

This report provides guidance for the refinement and use of captive broodstock technology for Pacific salmon (Oncorhynchus spp.) by bringing together information on the husbandry techniques, genetic risks, physiology, nutrition, and pathology affecting captive broodstocks. Captive broodstock rearing of Pacific salmon is an evolving technology, as yet without well defined standards. At present, we regard captive rearing of Pacific salmon as problematic: high mortality rates and low egg viability were common in the programs we reviewed for this report. One of the most important elements in fish husbandry is the culture environment itself. Many captive broodstock programs for Pacific salmon have reared fish from smolt-to-adult in seawater net-pens, and most have shown success in providing gametes for recovery efforts. However, some programs have lost entire brood years to diseases that transmitted rapidly in this medium. Current programs for endangered species of Pacific salmon rear most fish full-term to maturity in fresh well-water, since ground water is low in pathogens and thus helps ensure survival to adulthood. Our review suggested that captive rearing of fish in either freshwater, well-water, or filtered and sterilized seawater supplied to land-based tanks should produce higher survival than culture in seawater net-pens.

Flagg, Thomas A.; Mahnaken, Conrad V.W.; Hard, Jeffrey J.

1995-06-01T23:59:59.000Z

49

Grande Ronde Endemic Spring Chinook Salmon Supplementation Project; Lostine River Operations and Maintenance 2007 Smolt Acclimation and Adult Return Report.  

SciTech Connect (OSTI)

The Nez Perce Tribe (NPT), through funding provided by the Bonneville Power Administration (BPA), has implemented a Chinook salmon supplementation program (250,000 smolts) on the Lostine River, a tributary to the Grande Ronde River of Oregon. The Grande Ronde Endemic Spring Chinook Salmon Supplementation project, which involves supplementation of the Upper Grande Ronde River and Catherine Creek in addition to the Lostine River, was established to prevent extirpation and increase the number of threatened Snake River spring/summer Chinook salmon (Oncorhynchus tshawytscha) returning to the Grande Ronde River. This report covers the eleventh season (1997-2007) of adult Chinook salmon broodstock collection in the Lostine River and the ninth season (1999-2007) of acclimation of resulting Lostine River progeny. Production of Lostine River spring Chinook salmon smolts currently occurs at Lookingglass Fish Hatchery (LGH). The Lostine River supplementation program utilizes two strategies to obtain egg source for production of smolts for supplementation: captive broodstock and conventional broodstock. The captive broodstock strategy involves (1) capture of natural juvenile spring Chinook salmon smolts from the Lostine River, (2) rearing those to adult and spawning them, and (3) rearing the resultant progeny for eventual acclimation and release back into the Lostine River. The conventional broodstock strategy involves (1) capture of natural and hatchery origin adults returning to the Lostine River, (2) holding those adults and spawning them, and (3) rearing the resultant progeny for acclimation and release back into the Lostine River. This report focuses on (1) the trapping and collection of adult spring Chinook salmon that return to the Lostine River, which provides the broodstock source for the conventional strategy and (2) the acclimation and release of juvenile spring Chinook salmon produced from the captive broodstock and conventional broodstock strategies In 2007, acclimation of Lostine River spring Chinook salmon smolts occurred from 3/5/07 through to 4/17/07 and a total of 230,010 smolts were acclimated and released. These smolts were produced from the brood year (BY) 2005 egg source and included captive brood (24,604) and conventional (205,406) origin smolts that were all progeny of Lostine River spring Chinook salmon. Operation of the Lostine River adult monitoring and collection facility in 2007 began May 14th. The first Chinook was captured on June 2, 2007 and the last Chinook was captured on September 25, 2007. The weir and trap were removed on October 1, 2007. A total of 637 adult Chinook, including jacks, were captured during the season. The composition of the run included 240 natural origin fish and 397 hatchery supplementation fish. There were no identified 'stray' hatchery fish from other programs trapped. Of the fish captured, 41 natural and 81 hatchery supplementation adults were retained for broodstock and transported to LGH for holding and spawning, 403 adult Chinook were passed or transported above the weir to spawn naturally, and only hatchery origin jack Chinook were transported and outplanted in the Wallowa River and Bear Creek in underseeded habitat. Of the 122 adult fish retained for broodstock, 20 natural females and 40 supplementation females were represented in spawning. The eggs from these females produced a total of 267,350 eggs at fertilization. Eye-up was 86.73% which yielded a total of 231,882 conventional program eyed eggs. The fecundity averaged 4,456 eggs per female. These eggs will be incubated and reared at Lookingglass Hatchery until they are smolts in the spring of 2009. Captive brood program eggs/fish will be added to the conventional program eggs to make up the entire juvenile release for the Lostine River program in 2009. Due to the success of the 2007 egg collection, the number of fish produced exceeded program needs and facility capabilities. As a result, there are plans to outplant fry in 2008 and parr in early 2009 to underseeded habitat in the Wallowa River.

Zollman, Richard L.; Eschler, Russell; Sealey, Shawn [Nez Perce Tribe

2009-03-31T23:59:59.000Z

50

Grande Ronde Endemic Spring Chinook Salmon Supplementation Project; Lostine River Operations and Maintenance 2004 Smolt Acclimation and Adult Return Report.  

SciTech Connect (OSTI)

The Nez Perce Tribe (NPT), through funding provided by the Bonneville Power Administration (BPA), has implemented a Chinook salmon supplementation program (250,000 smolts) on the Lostine River, a tributary to the Grande Ronde River of Oregon. The Grande Ronde Endemic Spring Chinook Salmon Supplementation project, which involves supplementation of the Upper Grande Ronde River and Catherine Creek in addition to the Lostine River, was established to prevent extirpation and increase the number of threatened Snake River spring/summer Chinook salmon (Oncorhynchus tshawytscha) returning to the Grande Ronde River. This report covers the eighth season (1997-2004) of adult Chinook salmon broodstock collection in the Lostine River and the sixth season (1999-2004) of acclimation of resulting Lostine River progeny. Production of Lostine River spring Chinook salmon smolts currently occurs at Lookingglass Fish Hatchery (LGH). The Lostine River supplementation program utilizes two strategies to obtain egg source for production of smolts for supplementation: captive broodstock and conventional broodstock. The captive broodstock strategy involves (1) capture of natural juvenile spring Chinook salmon smolts from the Lostine River, (2) rearing those to adult and spawning them, and (3) rearing the resultant progeny for eventual acclimation and release back into the Lostine River. The conventional broodstock strategy involves (1) capture of natural and hatchery origin adults returning to the Lostine River, (2) holding those adults and spawning them, and (3) rearing the resultant progency for acclimation and release back into the Lostine River. This report focuses on (1) the trapping and collection of adult spring Chinook salmon that return to the Lostine River, which provides the broodstock source for the conventional strategy and (2) the acclimation and release of juvenile spring Chinook salmon produced from the captive broodstock and conventional broodstock strategies. In 2004, acclimation of Lostine River spring Chinook salmon smolts occurred from March 1, 2004 through to April 14, 2004 and a total of 250,249 smolts were acclimated and released. These smolts were produced from the brood year (BY) 2002 egg source and included captive brood (133,781) and conventional (116,468) origin smolts that were all progeny of Lostine River spring Chinook salmon. Operation of the Lostine River adult monitoring and collection facility in 2004 began May 10, the first Chinook was captured on May 19, 2004 and the last Chinook was captured on September 16, 2004. The weir and trap were removed on October 1, 2004. A total of 1,091 adult Chinook, including jacks, were captured during the season. The composition of the run included 299 natural origin fish and 792 hatchery supplementation fish. There were no identified 'stray' hatchery fish from other programs trapped. Of the fish captured, 46 natural and 69 hatchery supplementation adults were retained for broodstock and transported to Lookingglass Hatchery for holding and spawning, 537 adult Chinook were passed or transported above the weir to spawn naturally, and 447 hatchery origin adult Chinook were transported and outplanted in the Wallowa River and Bear Creek to spawn in underseeded habitat. Of the 107 adults retained (eight additional hatchery females were collected and then later returned to the Lostine River to spawn naturally) for broodstock at Lookingglass Hatchery, 22 natural females and 30 supplementation females were represented in spawning. These females produced a total of 221,889 eggs at fertilization. Eye-up was 94.9% which yielded a total of 210,661 conventional program eyed eggs. The fecundity averaged 4,267 eggs per female. These eggs were incubated and at Lookingglass Hatchery until eyed stage and then transferred to Oxbow Hatchery where they will be reared to the fingerling stage. They will then be transported back to LGH and reared to the smolt stage and then transported to the Lostine acclimation facility for release in the spring of 2006. Captive brood program eggs/fish will be added to

Zollman, Richard L.; Eschler, Russell; Sealey, Shawn [Nez Perce Tribe

2009-03-31T23:59:59.000Z

51

Grande Ronde Endemic Spring Chinook Salmon Supplementation Project; Lostine River Operations and Maintenance 2003 Smolt Acclimation and Adult Return Report.  

SciTech Connect (OSTI)

The Nez Perce Tribe (NPT), through funding provided by the Bonneville Power Administration (BPA), has implemented a Chinook salmon supplementation program (250,000 smolts) on the Lostine River, a tributary to the Grande Ronde River of Oregon. The Grande Ronde Endemic Spring Chinook Salmon Supplementation project, which involves supplementation of the Upper Grande Ronde River and Catherine Creek in addition to the Lostine River, was established to prevent extirpation and increase the number of threatened Snake River spring/summer Chinook salmon (Oncorhynchus tshawytscha) returning to the Grande Ronde River. This report covers the seventh season (1997-2003) of adult Chinook salmon broodstock collection in the Lostine River and the fifth season (1999-2003) of acclimating the resultant progeny. Production of Lostine River spring Chinook salmon smolts currently occurs at Lookingglass Fish Hatchery (LGH). The Lostine River supplementation program utilizes two strategies to obtain egg source for production of smolts for supplementation: captive broodstock and conventional broodstock. The captive broodstock strategy involves (1) capture of natural juvenile spring Chinook salmon smolts from the Lostine River, (2) rearing those to adult and spawning them, and (3) rearing the resultant progeny for eventual acclimation and release back into the Lostine River. The conventional broodstock strategy involves (1) capture of natural and hatchery origin adults returning to the Lostine River, (2) holding those adults and spawning them, and (3) rearing the resultant progeny for acclimation and release back into the Lostine River. This report focuses on (1) the trapping and collection of adult spring Chinook salmon that return to the Lostine River, which provides the broodstock source for the conventional strategy and (2) the acclimation and release of juvenile spring Chinook salmon produced from the captive broodstock and conventional broodstock strategies. In 2003, acclimation of Lostine River spring Chinook salmon smolts occurred from March 3, 2003 through to April 14, 2003 and a total of 242,776 smolts were acclimated and released. These smolts were produced from the brood year (BY) 2001 egg source and included captive broodstock (141,860) and conventional broodstock (100,916) origin smolts that were all progeny of Lostine River spring Chinook salmon. Operation of the Lostine River adult monitoring and collection facility in 2003 began April 30th, the first Chinook was captured on May 16, 2003 and the last Chinook was captured on September 21, 2003. The weir and trap were removed on October 1, 2003. A total of 464 adult Chinook, including jacks, were captured during the season. The composition of the run included 239 natural origin fish and 225 hatchery supplementation fish. There were no identified 'stray' hatchery fish from other programs trapped. Of the fish captured, 45 natural and 4 hatchery supplementation adults were retained for broodstock and transported to LGH for holding and spawning, 366 adult Chinook were passed or transported above the weir to spawn naturally, and 49 hatchery origin adult jack Chinook were transported and outplanted in the Wallowa River and Bear Creek to spawn in underseeded habitat. Of the 49 adults retained for broodstock at Lookingglass Hatchery, 21 natural females and no hatchery origin females were represented in spawning. These females produced a total of 106,609 eggs at fertilization. Eye-up was 95.50% which yielded a total of 101,811 conventional program eyed eggs. The fecundity averaged 5,077 eggs per female. These eggs were incubated and at Lookingglass Hatchery until eyed stage. At eye they were transferred to Oxbow Hatchery where they were reared to the fingerling state at which time they were transported back to LGH until they were smolts in the spring of 2005. Captive brood program eggs/fish will be added to the conventional program eggs to make up the entire juvenile release for the Lostine River program in 2005.

Zollman, Richard L.; Eschler, Russell; Sealey, Shawn [Nez Perce Tribe

2009-03-31T23:59:59.000Z

52

Captive power plants and industrial sector in the developing countries  

SciTech Connect (OSTI)

The electrical power and energy is essential for the industrial sector of the countries which are transferring its social structure to the industry oriented one from the agrarian society. In Asian countries, this kind of transformation has actively been achieved in this century starting from Japan and followed by Korea, Taiwan, and it is more actively achieved in the countries of Malaysia, Indonesia, Thailand, Philippine, India and China(PRC) in these days. It is valuable to review the effective utilizing of Power and Energy in the industrial sector of the developing countries. In this paper, it is therefore focussed to the captive power plants comparing those of utility companies such as government owned electrical power company and independent power company. It is noticed that major contribution to the electrical power generation in these days is largely dependent on the fossil fuel such as coal, oil and gas which are limited in source. Fossil energy reserves are assumed 1,194 trillion cubic meters or about 1,182 billion barrels of oil equivalent for natural gas 1,009 billion barrels for oil and at least 930 billion tons for coal in the world. According to the statistic data prepared by the World Energy Council, the fossil fuel contribution to electrical power generation records 92.3% in 1970 and 83.3% in 1990 in the world wide. Primary energy source for electrical power generation is shown in figure 1. It is therefore one of the most essential task of human being on how to utilize the limited fossil energy effectively and how to maximize the thermal efficiency in transferring the fossil fuel to usable energy either electrical power and energy or thermal energy of steam or hot/chilled water.

Lee, Rim-Taig [Hyundai Engineering Co. (Korea, Republic of)

1996-12-31T23:59:59.000Z

53

Observation of the cervix and artificial insemination in captive white-tailed deer  

E-Print Network [OSTI]

OBSERVATION OF THE CERVIX AliD ARTIFICIAL INSEMINATION IN CAPTIVE WHITE-TAILED DEER A Thesis by STEPHEN JOHN MAGYAR Submitted to the Graduate College of Texas A&M University in partial fulfillment of the requirements for the degree of MASTER... OF SCIENCE August 1986 Major Subject: Veterinary Physiology OBSERVATION OF THE CERVIX AND ARTIFICIAL INSEMINATION IN CAPTIVE WHITE-TAILED DEER A Thesis by STEPHEN JOHN MAGYAR Approved as to style and content by: Stephen W. J. Sea er (Chairman of Co...

Magyar, Stephen John

2012-06-07T23:59:59.000Z

54

Our River  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

River River Nature Bulletin No. 22 July 7, 1945 Forest Preserve District of Cook County Clayton F. Smith, President Roberts Mann, Superintendent of Conservation OUR RIVER The people of Cook County are missing a bet. They are not using their DesPlaines River. The other day we took a boat trip down that river from Lake County to Lawndale Avenue in Summit. It being a week day, we saw few people other than an occasional fisherman or pairs of strolling boys. Except for a bridge now and then, there were no signs or sounds of civilization. Chicago might have been a thousand miles away. We rested. There was isolation. There was peace. Once in a while a heron flew ahead of us; or a squirrel scampered up a tree; once we saw a family of young muskrats playing around the entrance to their den in the bank; twice we saw and heard a wood duck; again and again big fish plowed ripples surging ahead of us. It was shady and cool and still beneath the arching trees. We thought of the centuries this river had traveled. We were babes nuzzling again at the breast of Mother Nature.

55

River Steamboats  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

River Steamboats River Steamboats Nature Bulletin No. 628-A February 12, 1977 Forest Preserve District of Cook County George W. Dunne, President Roland F. Eisenbeis, Supt. of Conservation RIVER STEAMBOATS The westward migration of the pioneer settlers and the rapid growth of agriculture, commerce and industry in the Middle West is in large part the story of water transportation on our inland waterways. The two main water routes were the chain of Great Lakes on the north and the Ohio River on the south. Sailing vessels carrying hundreds of tons were able to navigate on the Great Lakes almost as freely as on the ocean. Also, on the Ohio and Mississippi rivers heavy loads could be floated downstream from Pittsburgh to New Orleans -- almost 2000 miles. But boats had to be hauled back upstream by manpower -- grueling labor, stretching over weeks or months to move a few tons a few hundred miles. The coming of the steamboat a century and a half ago changed all this.

56

Grande Ronde Endemic Spring Chinook Salmon Supplementation Project; Lostine River Operations and Maintenance 2006 Smolt Acclimation and Adult Return Report.  

SciTech Connect (OSTI)

The Nez Perce Tribe (NPT), through funding provided by the Bonneville Power Administration (BPA), has implemented a Chinook salmon supplementation program (250,000 smolts) on the Lostine River, a tributary to the Grande Ronde River of Oregon. The Grande Ronde Endemic Spring Chinook Salmon Supplementation project, which involves supplementation of the Upper Grande Ronde River and Catherine Creek in addition to the Lostine River, was established to prevent extirpation and increase the number of threatened Snake River spring/summer Chinook salmon (Oncorhynchus tshawytscha) returning to the Grande Ronde River. This report covers the tenth season (1997-2006) of adult Chinook salmon broodstock collection in the Lostine River and the eighth season (1999-2006) of acclimation of resulting Lostine River progeny. Production of Lostine River spring Chinook salmon smolts currently occurs at Lookingglass Fish Hatchery (LGH). The Lostine River supplementation program utilizes two strategies to obtain egg source for production of smolts for supplementation: captive broodstock and conventional broodstock. The captive broodstock strategy involves (1) capture of natural juvenile spring Chinook salmon smolts from the Lostine River, (2) rearing those to adult and spawning them, and (3) rearing the resultant progeny for eventual acclimation and release back into the Lostine River. The conventional broodstock strategy involves (1) capture of natural and hatchery origin adults returning to the Lostine River, (2) holding those adults and spawning them, and (3) rearing the resultant progeny for acclimation and release back into the Lostine River. This report focuses on (1) the trapping and collection of adult spring Chinook salmon that return to the Lostine River, which provides the broodstock source for the conventional strategy and (2) the acclimation and release of juvenile spring Chinook salmon produced from the captive broodstock and conventional broodstock strategies In 2006, acclimation of Lostine River spring Chinook salmon smolts occurred from February 27, 2006 through to April 10, 2006 and a total of 240,568 smolts were acclimated and released. These smolts were produced from the brood year (BY) 2004 egg source and included captive brood (40,982) and conventional (199,586) origin smolts that were all progeny of Lostine River spring Chinook salmon. Operation of the Lostine River adult monitoring and collection facility in 2006 began May 15th, the first Chinook was captured on June 14, 2006 and the last Chinook was captured on September 27, 2006. The weir and trap were removed on October 1, 2006. A total of 534 adult Chinook, including jacks, were captured during the season. The composition of the run included 205 natural origin fish and 329 hatchery supplementation fish. There were no identified 'stray' hatchery fish from other programs trapped. Of the fish captured, 33 natural and 120 hatchery supplementation adults were retained for broodstock and transported to LGH for holding and spawning and 397 adult Chinook were passed or transported above the weir to spawn naturally. In 2006, no hatchery origin adult Chinook were transported and out planted in the Wallowa River and Bear Creek to spawn in under seeded habitat. In order to meet egg take goals for the conventional portion of the program, a determination was made that approximately 147 adults were needed for broodstock. As a result 16 (8 males and 8 females) of the 153 fish collected for broodstock were returned to the Lostine River to spawn naturally. Females that were spawned and provided the brood source were made up of 12 natural females and 45 supplementation females. One of these females tested positive for high levels of Bacterial Kidney Disease and consequently this females eggs were destroyed. The remaining females produced a total of 241,372 eggs at fertilization. Eye-up was 85.47% which yielded a total of 206,309 conventional program eyed eggs. The fecundity averaged 4,162 eggs per female. The brood year 2006 eggs will be incubated and reared at Lookingglass Hatchery until

Zollman, Richard L.; Eschler, Russell; Sealey, Shawn [Nez Perce Tribe

2009-03-31T23:59:59.000Z

57

Missile Captive Carry Monitoring and Helicopter Identification Using a Capacitive Microelectromechanical Systems Accelerometer  

SciTech Connect (OSTI)

Military missiles are exposed to many sources of mechanical vibration that can affect system reliability, safety, and mission effectiveness. The U. S. Army Aviation and Missile Research Development and Engineering Center (AMRDEC) has been developing missile health monitoring systems to assess and improve reliability, reduce life cycle costs, and increase system readiness. One of the most significant exposures to vibration occurs when the missile is being carried by a helicopter or other aviation platform, which is a condition known as captive carry. Recording the duration of captive carry exposure during the missiles service life can enable the implementation of predictive maintenance and resource management programs. Since the vibration imparted by each class of helicopter varies in frequency and amplitude, tracking the vibration exposure from each helicopter separately can help quantify the severity and harmonic content of the exposure. Under the direction of AMRDEC staff, engineers at the Pacific Northwest National Laboratory have developed a Captive Carry Health Monitor (CCHM) for the Hellfire II missile. The CCHM is an embedded usage monitoring device installed on the outer skin of the Hellfire II missile to record the cumulative hours the host missile has been in captive carry mode. To classify the vibration by class of helicopter, the CCHM analyzes the amplitude and frequency content of the vibration with the Goertzel algorithm to detect the presence of distinctive rotor harmonics. Cumulative usage data are accessible in theater from an external display; monthly usage histograms are accessible through an internal download connector. This paper provides an overview of the CCHM electrical and package design, describes field testing and data analysis techniques used to monitor captive carry identify and the class of helicopter, and discusses the potential application of missile health and usage data for real-time reliability analysis and fleet management.

Hatchell, Brian K.; Mauss, Fredrick J.; Amaya, Ivan A.; Skorpik, James R.; Silvers, Kurt L.; Marotta, Steve

2012-03-27T23:59:59.000Z

58

Survival Estimates for the Passage of Spring-Migrating Juvenile Salmonids through Snake and Columbia River Dams and Reservoirs, 2000 Annual Report.  

SciTech Connect (OSTI)

In 2000, the National Marine Fisheries Service and the University of Washington completed the eight year of a study to estimate survival of juvenile salmonids (Oncorhynchus spp.) passing through dams and reservoirs on the Snake and Columbia Rivers. A total of 20,313 hatchery steelhead were tagged with passive integrated transpoder (PIT) tags and released at Lower Granite Dam for reach survival estimation. They did not PIT tag any yearlying chinook salmon (O. tshawytscha) for reach survival estimates in 2000 because sufficient numbers for these estimates were available from other studies. Primary research objectives in 2000 were (1) to estimate reach and project survival in the Snake and Columbia Rivers throughout the yearling chinook salmon and steelhead migrations, and (2) to evaluate the survival-estimation models under prevailing conditions. In addition, they estimated survival from point of release to Lower Granite Dam and below for chinook salmon, steelhead, and sockeye salmon (O.nerka) PIT tagged and released at Snake River basin hatcheries and chinook salmon and steelhead PIT tagged and released at Snake River basin hatcheries and chinook salmon and steelhead PIT tagged and released at Snake River basin smolt traps. This report provides reach survival and travel time estimates for 2000 for PIT-tagged yearling chinook salmon and steelhead (hatchery and wild) in the Snake and Columbia Rivers. Results are reported primarily in the form of tables and figures. Further details on methodology and statistical models used are provided in previous reports cited in the text.

Zabel, Richard; Smith, Steven G.; Muir, William D. (Northwest and Alaska Fisheries Science Center, Fish Ecology Division, Seattle, WA)

2001-02-01T23:59:59.000Z

59

CX-002773: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2773: Categorical Exclusion Determination 2773: Categorical Exclusion Determination CX-002773: Categorical Exclusion Determination Idaho Department of Fish and Game Purchase of Crystal Springs Trout Farm - Snake River Sockeye Captive Propagation Program CX(s) Applied: A7 Date: 06/04/2010 Location(s): Springfield, Idaho Office(s): Bonneville Power Administration Bonneville Power Administration is proposing to provide funding to Idaho Department of Fish and Game (IDFG) to purchase the existing Crystal Springs Trout Farm situated on 72.53 acres of land in Bingham County, Idaho. IDFG plans to use this existing facility for the rearing of Snake River sockeye salmon - a Federally-listed salmonid species. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-002773.pdf More Documents & Publications EA-1913: Finding of No Significant Impact

60

Male reproduction in penaeid shrimp: sperm quality and spermatophore production in wild and captive populations  

E-Print Network [OSTI]

CHAPTER II LITERATURE REVIEW i t iR~nd t O~y A review of information on the male reproductive system and its contml will give insight and further our understanding of the male reproductive process in penaeid shrimp. The male reproductive system...MALE REPRODUCTION IN PENAEID SHRIMP: SPERM QUALITY AND SPERMATOPHORE PRODUCTION IN WILD AND CAPTIVE POPULATIONS A Thesis by JOANNA RUTH TRUJILLO Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment...

Leung-Trujillo, Joanna R

1990-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "river sockeye captive" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Red River Compact (Texas)  

Broader source: Energy.gov [DOE]

The Red River Compact Commission administers the Red River Compact to ensure that Texas receives its equitable share of quality water from the Red River and its tributaries as apportioned by the...

62

Scenic Rivers Act (Virginia)  

Broader source: Energy.gov [DOE]

Virginia Scenic Rivers Programs intent is to identify, designate and help protect rivers and streams that possess outstanding scenic, recreational, historic and natural characteristics of...

63

Platte River Cooperative Agreement  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Platte River Cooperative Agreement Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Platte River Cooperative Agreement PEIS, NE, WY,...

64

River Basin Commissions (Indiana)  

Broader source: Energy.gov [DOE]

This legislation establishes river basin commissions, for the Kankakee, Maumee, St. Joseph, and Upper Wabash Rivers. The commissions facilitate and foster cooperative planning and coordinated...

65

Maine Rivers Policy (Maine)  

Broader source: Energy.gov [DOE]

The Maine Rivers Policy accompanies the Maine Waterway Development and Conservation Act and provides additional protection for some river and stream segments, which are designated as outstanding...

66

Project #31: Connecticut River  

Science Journals Connector (OSTI)

GEOMORPHIC SETTING: At the project location, the Connecticut River has an annual average discharge of...

Wendi Goldsmith; Donald Gray; John McCullah

2014-01-01T23:59:59.000Z

67

Response to IRSP. Project ID 35027: Evaluation of Two Captive Rearing Methods for Assisting with Recovery of Naturally Spawning  

E-Print Network [OSTI]

general procedures cited by Paul Moran and Robin Waples (P.I's.) under Project No. 198909600. The USFWSResponse to IRSP. Project ID 35027: Evaluation of Two Captive Rearing Methods for Assisting. We will store the fin clips at room temperature prior to DNA extraction. Procedures for DNA

68

Pecos River Compact (Texas)  

Broader source: Energy.gov [DOE]

This legislation authorizes the state's entrance into the Pecos River Compact, a joint agreement between the states of New Mexico and Texas. The compact is administered by the Pecos River Compact...

69

Turbulent Rivers Bjorn Birnir  

E-Print Network [OSTI]

) function gives rise to Hack's law [16]; stating that the length of the main river, in mature river basins, scales with the area of the basin l Ah, h = 0.568 being Hack's exponent. 1 Introduction The flow]. One of the best known scaling laws of river basins is Hack's law [16] that states that the area

Birnir, Björn

70

The Reaches Project : Ecological and Geomorphic Dtudies Supporting Normative Flows in the Yakima River Basin, Washington, Final Report 2002.  

SciTech Connect (OSTI)

The Yakima River system historically produced robust annual runs of chinook, sockeye, chum and coho salmon and steelhead. Many different stocks or life history types existed because the physiography of the basin is diverse, ranging from very dry and hot in the high desert of the lower basin to cold and wet in the Cascade Mountains of the headwaters (Snyder and Stanford 2001). Habitat diversity and life history diversity of salmonids are closely correlated in the Yakima Basin. Moreover, habitat diversity for salmonids and many other fishes maximizes in floodplain reaches of river systems (Ward and Stanford 1995, Independent Scientific Group 2000). The flood plains of Yakima River likely were extremely important for spawning and rearing of anadromous salmonids (Snyder and Stanford 2001). However, Yakima River flood plains are substantially degraded. Primary problems are: revetments that disconnect main and side channel habitats; dewatering associated with irrigation that changes base flow conditions and degrades the shallow-water food web; chemical and thermal pollution that prevents proper maturation of eggs and juveniles; and extensive gravel mining within the floodplain reaches that has severed groundwater-channel connectivity, increased thermal loading and increased opportunities for invasions of nonnative species. The Yakima River is too altered from its natural state to allow anything close to the historical abundance and diversity of anadromous fishes. Habitat loss, overharvest and dam and reservoir passage problems in the mainstem Columbia River downstream of the Yakima, coupled with ocean productivity variation, also are implicated in the loss of Yakima fisheries. Nonetheless, in an earlier analysis, Snyder and Stanford (2001) concluded that a significant amount of physical habitat remains in the five floodplain reaches of the mainstem river because habitat-structuring floods do still occur on the remaining expanses of floodplain environment. Assuming main stem and ocean bottlenecks are not overriding, restoration of floodplain connectivity by elevating base flows throughout the corridor, removing revetments and refilling gravel pits by natural riverine transport of gravel where possible could be successful in substantially enhancing Yakima salmon and steelhead runs. Hence, the overarching purpose of this research was to determine the ecology of major floodplain reaches of the Yakima River: Cle Elum, Kittitas, Naches, Union Gap and Wapato. Specifically, the study documented groundwater-channel connectivity and flow relations; use and quality of side channel and other floodplain habitats by salmonid fishes; and classification and analysis of floodplain habitat using remote sensing and documentation of geomorphic processes, required for a robust understanding of the feasibility of revetment removal and establishment of a normative flow regime for the mainstem river.

Stanford, Jack A.; Lorang, Mark N.; Matson, Phillip L. (University of Montana, Flathead Lake Biological Station, Poison, MT)

2002-10-01T23:59:59.000Z

71

Savannah River Site - Reports  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Reports Reports Savannah River Site Review Reports 2013 Independent Oversight Review of the Savannah River Field Office Tritium Facilities Radiological Controls Activity-Level Implementation, November 2013 Independent Oversight Review of the Savannah River Site Salt Waste Processing Facility Safety Basis and Design Development, August 2013 Independent Oversight Review of the Employee Concerns Program at the Savannah River Operations Office, July 2013 Assessment of Nuclear Safety Culture at the Salt Waste Processing Facility Project, January 2013 Review of the Savannah River Site, Waste Solidification Building, Construction Quality of Mechanical Systems Installation and Selected Aspects of Fire Protection System Design, January 2013 Activity Reports 2013 Savannah River Site Waste Solidification Building Corrective Actions from the January 2013 Report on Construction Quality of Mechanical Systems Installation and Fire Protection Design, May 2013

72

Office of River Protection (ORP) and Washingotn River Protection Solutions,  

Broader source: Energy.gov (indexed) [DOE]

Office of River Protection (ORP) and Washingotn River Protection Office of River Protection (ORP) and Washingotn River Protection Solutions, LLC (WRPS) Partnering Agreement for the DOE-EM Tank Operations Project Office of River Protection (ORP) and Washingotn River Protection Solutions, LLC (WRPS) Partnering Agreement for the DOE-EM Tank Operations Project The Mission of the Office of River Protection is to safely retrieve and treat Hanford's tank waste and close the Tank Farms to protect the Columbia River. Office of River Protection (ORP) and Washingotn River Protection Solutions, LLC (WRPS) Partnering Agreement for the DOE-EM Tank Operations Project More Documents & Publications 2011 Annual Workforce Analysis and Staffing Plan Report - Office of River Protection Consent Order, Washington River Protection Solutions, LLC - NCO-2011-01

73

Columbia River Treaty  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

an understanding of the implications for post-2024 Treaty planning and Columbia River operations. The joint effort by the Entities to conduct initial post-2024 modeling and...

74

Savannah River Ecology Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of lab building SREL Home Faculty and Scientists Research Technical Reports Assessment of Radionuclide Monitoring in the CSRA Savannah River NERP Research Opportunities Field Sites...

75

Captive and Wild Observations of the Courtship and Spawning Behavior of Guadalupe Bass Micropterus treculii  

E-Print Network [OSTI]

................................... 108 Table 4 Water Quality and Nesting Data: A.E. Wood Hatchery Raceway #2 ....... 109 1 1. INTRODUCTION The Guadalupe Bass Micropterus treculii is endemic to the Edwards Plateau region of Texas in the Brazos, Colorado, Guadalupe and San... Antonio River drainages (Koppelman and Garrett 2002; MacCrimmon and Robbins 1975; Page and Burr 2011). The Guadalupe Bass inhabits swift moving rivers and streams within its native range of the Edwards Plateau region of central Texas (Hubbs 1957...

Enriquez, Edward James

2013-12-06T23:59:59.000Z

76

Schlumberger soundings in the Upper Raft River and Raft River...  

Open Energy Info (EERE)

Schlumberger soundings in the Upper Raft River and Raft River Valleys, Idaho and Utah Abstract In 1975, the U.S. Geological Survey made seventy Schlumberger resistivity...

77

Savannah River | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

River River Savannah River Following are compliance agreements for the Savannah River Site. Also included are short summaries of the agreements. Natural Resources Defense Council Consent Decree, May 26, 1988 Natural Resources Defense Council Consent Decree, May 26, 1988 Summary Savannah River Site Consent Order 99-155-W, October 11, 1999 Savannah River Site Consent Order 99-155-W, October 11, 1999 Summary Savannah River Site Consent Order 85-70-SW, November 7, 1985 Savannah River Site Consent Order 85-70-SW, November 7, 1985 Summary Savannah River Site Consent Order 95-22-HW, September 29, 1995 Savannah River Site Consent Order 95-22-HW, September 29, 1995 Summary Savannah River Site Consent Order 99-21-HW, July 13, 1999 Savannah River Site Consent Order 99-21-HW, July 13, 1999 Summary

78

Savannah River | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Savannah River Savannah River Savannah River Following are compliance agreements for the Savannah River Site. Also included are short summaries of the agreements. Natural Resources Defense Council Consent Decree, May 26, 1988 Natural Resources Defense Council Consent Decree, May 26, 1988 Summary Savannah River Site Consent Order 99-155-W, October 11, 1999 Savannah River Site Consent Order 99-155-W, October 11, 1999 Summary Savannah River Site Consent Order 85-70-SW, November 7, 1985 Savannah River Site Consent Order 85-70-SW, November 7, 1985 Summary Savannah River Site Consent Order 95-22-HW, September 29, 1995 Savannah River Site Consent Order 95-22-HW, September 29, 1995 Summary Savannah River Site Consent Order 99-21-HW, July 13, 1999 Savannah River Site Consent Order 99-21-HW, July 13, 1999 Summary

79

River Edge Redevelopment Zone (Illinois)  

Broader source: Energy.gov [DOE]

The purpose of the River Edge Redevelopment Program is to revive and redevelop environmentally challenged properties adjacent to rivers in Illinois.

80

The Nation's Rivers  

Science Journals Connector (OSTI)

...task of water quality assessment." Such interpretation...environment demands continuing assessment and interpretation...pro-cesses active in river systems and hence such measures...character of many river systems. To date, observations...money, observational tools must be designed to...

M. Gordon Wolman

1971-11-26T23:59:59.000Z

Note: This page contains sample records for the topic "river sockeye captive" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Columbia River Basin Accords -Narrative Proposal Form 1 Table 1. Proposal  

E-Print Network [OSTI]

for outmigration as sockeye, and if possible maintain a self sustaining resident kokanee population that can about 300 fish in 1973 and 1976 (O'Connor et al. 1993 as cited by Gustafson et al. 1997). A self-sustaining

82

Predicting the rivers blue line for fish conservation  

Science Journals Connector (OSTI)

...Basin (VRB), a tributary to the lower Colorado River that has been the poster child...rivers like the San Pedro River (also a Colorado River tributary in Arizona), citizen...reaches with zero flows (i.e., during floods) and hence colonize parts of the distant...

John L. Sabo

2014-01-01T23:59:59.000Z

83

Savannah River National Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Savannah River National Laboratory Savannah River National Laboratory srnl.doe.gov SRNL is a DOE National Laboratory operated by Savannah River Nuclear Solutions. At a glance Additive Manufacturing (3D Printing): Selectively Printed Conductive Pathways Researchers at the Savannah River National Laboratory (SRNL) have developed a rapid prototype conductive material that can be used for electrical shielding or circuit fabrication. Background Several rapid prototype technologies currently exist. A few of the technologies produce metallic parts, but the majority produce nonconductive parts made from various grades of plastic. In all of these technologies however, only conductive material or nonconductive material can be used within one part created. There is no known option for 3D printing conductive material for

84

Sioux River Ethanol LLC | Open Energy Information  

Open Energy Info (EERE)

Sioux River Ethanol LLC Jump to: navigation, search Name: Sioux River Ethanol LLC Place: Hudson, South Dakota Zip: 57034 Product: Farmer owned ethanol producer, Sioux River Ethanol...

85

Enforcement Letter, Westinghouse Savannah River Company - April...  

Broader source: Energy.gov (indexed) [DOE]

Savannah River Company - July 21, 1998 Enforcement Letter, Westinghouse Savannah River Company - March 29, 2000 Enforcement Letter, Savannah River Ecology Laboratory - June 7, 2000...

86

Natural Propagation and Habitat Improvement, Volume I, Oregon, Supplement C, White River Habitat Inventory, 1983 Annual Report.  

SciTech Connect (OSTI)

More than 130 miles of stream fish habitat was inventoried and evaluated on the Mt. Hood National Forest during the first year of this multi-year project. First year tasks included field inventory and evaluation of habitat conditions on the White River and tributary streams thought to have the highest potential for supporting anadromous fish populations. All streams inventoried were located on the Mt. Hood National Forest. The surveyed area appears to contain most of the high quality anadromous fish habitat in the drainage. Habitat conditions appear suitable for steelhead, coho, and chinook salmon, and possibly sockeye. One hundred and twenty-four miles of potential anadromous fish habitat were identifed in the survey. Currently, 32 miles of this habitat would be readily accessible to anadromous fish. An additional 72 miles of habitat could be accessed with only minor passage improvement work. About 20 miles of habitat, however, will require major investment to provide fish passage. Three large lakes (Boulder, 14 acres; Badger, 45 acres; Clear, 550 acres) appear to be well-suited for rearing anadromous fish, although passage enhancement would be needed before self-sustaining runs could be established in any of the lakes.

Heller, David

1984-04-01T23:59:59.000Z

87

Scenic River Protection Policy, Minnesota Wild and Scenic Rivers Act  

Broader source: Energy.gov (indexed) [DOE]

Scenic River Protection Policy, Minnesota Wild and Scenic Rivers Scenic River Protection Policy, Minnesota Wild and Scenic Rivers Act (Minnesota) Scenic River Protection Policy, Minnesota Wild and Scenic Rivers Act (Minnesota) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Minnesota Program Type Siting and Permitting

88

River Protection.PDF  

Broader source: Energy.gov (indexed) [DOE]

cc: cc: DOE/IG-0506 I N S P E C T I O N R E P O R T U.S. DEPARTMENT OF ENERGY OFFICE OF INSPECTOR GENERAL OFFICE OF INSPECTIONS I N S P E C T I O N O F SELECTED ASPECTS OF THE OFFICE OF RIVER PROTECTION PERFORMANCE-BASED INCENTIVE PROGRAM JUNE 2001 U.S. DEPARTMENT OF ENERGY Washington, DC 20585 June 14, 2001 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman /s/ Inspector General SUBJECT: INFORMATION: Report on "Inspection of Selected Aspects of the Office of River Protection Performance-Based Incentive Program" BACKGROUND The Office of River Protection (ORP), which reports to the Office of Environmental Management, is responsible for remediation of the radioactive waste stored in tanks at the Hanford Site in the State of Washington. For Fiscal Year (FY) 2000, ORP established 26 performance-based contract

89

Rivanna River Basin Commission (Virginia)  

Broader source: Energy.gov [DOE]

The Rivanna River Basin Commission is an independent local entity tasked with providing guidance for the stewardship and enhancement of the water quality and natural resources of the Rivanna River...

90

Ecotoxicology | Savannah River Ecology Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Savannah River NERP Research Opportunities Field Sites Data Research Facilities Low Dose Irradiation Facility Tritium Irrigation Facility Microsatellite Development Education...

91

River restoration Ellen Wohl,1  

E-Print Network [OSTI]

, massive expenditures, and the burgeoning industry of aquatic and riparian restoration, river ecosystems. Introduction: Problem Statement [2] Continuing degradation of river ecosystems and loss of aquatic biodiversityRiver restoration Ellen Wohl,1 Paul L. Angermeier,2 Brian Bledsoe,3 G. Mathias Kondolf,4 Larry Mac

Poff, N. LeRoy

92

Chao Phraya River  

Science Journals Connector (OSTI)

the river flow during low flow in January and 4% during high flow conditions in July 2004. The unit shoreline ...... since the water first became enriched in radium isotopes assuming no ... uranium-series isotopes (223Ra and 226Ra), estimating radium ages .... inventory into concentration by dividing by the water depth, which

2006-08-16T23:59:59.000Z

93

Condamine River Meteor Zamia  

E-Print Network [OSTI]

CONNORS Cape Townshend Townshend Island Island Long Broad Sound Condamine River Maran oa Comet Isaac Daws Roper Nogoa Ca llide Bungeworgorai North Balmy L ogan Denison L o t us Buck land Con ciliation Humb oldt Elphinstone Dam Eungella Dam R Ck Nebo RomaAmby Wowan Warra Miles Moura Dingo Comet Alpha Banana Rannes Marmor

Greenslade, Diana

94

Savannah River Site Robotics  

ScienceCinema (OSTI)

Meet Sandmantis and Frankie, two advanced robotic devices that are key to cleanup at Savannah River Site. Sandmantis cleans hard, residual waste off huge underground storage tanks. Frankie is equipped with unique satellite capabilities and sensing abilties that can determine what chemicals still reside in the tanks in a cost effective manner.

None

2012-06-14T23:59:59.000Z

95

The Nation's Rivers  

Science Journals Connector (OSTI)

...soil erosion and the need for soil conserva-tion were first clearly...residuals accumu-lated in soils, vegetation, and other organisms...from the Potomac River near Washing-ton, D.C., and doubtless...Ruhe and R. B. Daniels, J. Soil Water Conserv. 20, 52 (1965...

M. Gordon Wolman

1971-11-26T23:59:59.000Z

96

River meandering dynamics  

Science Journals Connector (OSTI)

The Ikeda, Parker, and Sawai river meandering model is reexamined using a physical approach employing an explicit equation of motion. For periodic river shapes as seen from above, a cross-stream surface elevation gradient creates a velocity shear that is responsible for the decay of small-wavelength meander bends, whereas secondary currents in the plane perpendicular to the downstream direction are responsible for the growth of large-wavelength bends. A decay length D=H/2Cf involving the river depth H and the friction coefficient Cf sets the scale for meandering, giving the downstream distance required for the fluid velocity profile to recover from changes in the channel curvature. Using this length scale and a time scale T, we explicitly trace the observed length scale invariance to the equations of motion, and predict similar time and velocity scale invariances. A general time-dependent nonlinear modal analysis for periodic rivers reveals that modes higher than the third mode are needed to describe upstream migration of bend apexes just before oxbow cutoff, and are important to accurate calculations of the time and sinuosity at cutoff.

Boyd F. Edwards and Duane H. Smith

2002-03-26T23:59:59.000Z

97

Salmonid Gamete Preservation in the Snake River Basin : 2000 Annual Report.  

SciTech Connect (OSTI)

Steelhead (Oncorhynchus mykiss) and chinook salmon (Oncorhynchus tshawytscha) populations in the Northwest are decreasing. Genetic diversity is being lost at an alarming rate. The Nez Perce Tribe (Tribe) strives to ensure availability of genetic samples of the existing male salmonid population by establishing and maintaining a germplasm repository. The sampling strategy, initiated in 1992, has been to collect and preserve male salmon and steelhead genetic diversity across the geographic landscape by sampling within the major river subbasins in the Snake River basin, assuming a metapopulation structure existed historically. Gamete cryopreservation conserves genetic diversity in a germplasm repository, but is not a recovery action for listed fish species. The Tribe was funded in 2000 by the Bonneville Power Administration (BPA) and the U.S. Fish and Wildlife Service Lower Snake River Compensation Plan (LSRCP) to coordinate gene banking of male gametes from Endangered Species Act listed steelhead and spring and summer chinook salmon in the Snake River basin. In 2000, a total of 349 viable chinook salmon semen samples from the Lostine River, Catherine Creek, upper Grande Ronde River, Lookingglass Hatchery (Imnaha River stock), Rapid River Hatchery, Lake Creek, the South Fork Salmon River weir, Johnson Creek, Big Creek, Capehorn Creek, Marsh Creek, Pahsimeroi Hatchery, and Sawtooth Hatchery (upper Salmon River stock) were cryopreserved. Also, 283 samples of male steelhead gametes from Dworshak Hatchery, Fish Creek, Grande Ronde River, Imnaha River, Little Sheep Creek, Pahsimeroi Hatchery and Oxbow Hatchery were also cryopreserved. The Tribe acquired 5 frozen steelhead samples from the Selway River collected in 1994 and 15 from Fish Creek sampled in 1993 from the U.S. Geological Survey, for addition into the germplasm repository. Also, 590 cryopreserved samples from the Grande Ronde chinook salmon captive broodstock program are being stored at the University of Idaho as a long-term archive, half of the total samples. A total of 2,420 cryopreserved samples from Snake River basin steelhead and spring and summer chinook salmon, from 1992 through 2000, are stored in two independent locations at the University of Idaho and Washington State University. Two large freezer tanks are located at each university, each of which holds approximately 25% of the cryopreserved sperm. One tank at each university is considered long-term archival storage, while the other is short-term. Fertility trials were conducted at each university to test the viability of the cryopreserved chinook salmon sperm. The experiments on the 2000 frozen and thawed sperm at both universities found a fertility rate of 60-70%. This document also summarizes 1999-2000 steelhead genetic analysis report. The results of mitochondrial, nuclear DNA and microsatellite analysis found differences and shared haplotypes between the stocks of fish sampled for cryopreservation. Recommendations for future gene banking efforts include the need for establishment of a regional genome resource bank, a greater emphasis on cryopreserving wild fish, continued fertility trials, exploring field cryopreservation and genetic analysis on all fish represented in the germplasm repository.

Armstrong, Robyn; Kucera, Paul A. [Nez Perce Tribe. Dept. of Fisheries Resource Management, Lapwai, ID (US)

2001-06-01T23:59:59.000Z

98

Savannah River Site - Enforcement Documents  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Enforcement Documents Enforcement Documents Savannah River Site Preliminary Notice of Violation issued to Savannah River Nuclear Solutions, LLC related to a Puncture Wound Injury resulting in a Radiological Uptake at the Savannah River Site, July 22, 2011 (NEA-2011-02) Consent Order issued to Parsons Infrastructure & Technology Group, Inc., related to Nuclear Facility Construction Deficiencies and Subcontractor Oversight at the Salt Waste Processing Facility at the Savannah River Site, April 13, 2010 Enforcement Letter issued to Amer Industrial Technologies, Inc. related to Weld Deficiencies at the Salt Waste Processing Facility at the Savannah River Site, April 13, 2010 Enforcement Letter issued to Parsons Technology Development & Fabrication Complex related to Deficiencies in the Fabrication of Safety Significant Embed Plates at the Salt Waste Processing Facility at the Savannah River Site, April 13, 2010

99

Susquehanna River Basin Compact (Maryland)  

Broader source: Energy.gov [DOE]

This legislation enables the state's entrance into the Susquehanna River Basin Compact, which provides for the conservation, development, and administration of the water resources of the...

100

Florida Nuclear Profile - Crystal River  

U.S. Energy Information Administration (EIA) Indexed Site

Crystal River1" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

Note: This page contains sample records for the topic "river sockeye captive" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

RIVER RESEARCH AND APPLICATIONS River Res. Applic. 21: 849864 (2005)  

E-Print Network [OSTI]

to assimilate wastewater treatment plant effluent. Our study illustrates the types of changes that river of future climate scenarios on flow regimes and how predicted changes might affect river ecosystems. We under future climate scenarios to describe the extent and type of changes predicted to occur. Daily

Poff, N. LeRoy

102

Enforcement Letter, Westinghouse Savannah River Company- November 14, 2003  

Broader source: Energy.gov [DOE]

Issued to Westinghouse Savannah River Company related to Criticality Safety Violations at the Savannah River Site

103

Enforcement Letter, Westinghouse Savannah River Company- April 19, 2004  

Broader source: Energy.gov [DOE]

Issued to Westinghouse Savannah River Company related to Employee Reprisal at the Savannah River Site

104

Pennsylvania Scenic Rivers Program | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Pennsylvania Scenic Rivers Program Pennsylvania Scenic Rivers Program Pennsylvania Scenic Rivers Program < Back Eligibility Utility Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Rural Electric Cooperative Transportation Savings Category Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Pennsylvania Program Type Environmental Regulations Siting and Permitting Provider Pennsylvania Department of Conservation and Natural Resources Rivers included in the Scenic Rivers System will be classified, designated and administered as Wild, Scenic, Pastoral, Recreational and Modified Recreational Rivers (Sections 4; (a) (1) of the Pennsylvania Scenic Rivers Act). Low dams are permitted on Modified Recreational Rivers, but are not

105

NERPs Definition | Savannah River National Environmental Park  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NERPS: Idaho, Hanford, Los Alamos, Oak Ridge, Fermilab, Nevada, and Savannah River. The Savannah River Site became the first NERP in 1972. Unlike National Parks, NERPs provide a...

106

Overview | Savannah River National Environmental Park  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Ecology Laboratory (SREL), USDA Forest Service - Savannah River (USFS-SR), and Savannah River National Laboratory (SRNL). As a research unit of UGA, SREL's primary function is...

107

Independent Oversight Review, Savannah River Operations Office...  

Energy Savers [EERE]

Savannah River Operations Office - July 2013 Independent Oversight Review, Savannah River Operations Office - July 2013 July 2013 Review of the Employee Concerns Program at the...

108

Independent Activity Report, Savannah River Operation - June...  

Broader source: Energy.gov (indexed) [DOE]

Operation - June 2010 Independent Activity Report, Savannah River Operation - June 2010 June 2010 Savannah River Operations Office Self-Assessment of the Technical Qualification...

109

Independent Activity Report, Savannah River Site - September...  

Office of Environmental Management (EM)

September 2010 Independent Activity Report, Savannah River Site - September 2010 Savannah River Site Salt Waste Processing Facility Effectiveness Review The U.S. Department of...

110

Independent Activity Report, Savannah River Remediation - July...  

Broader source: Energy.gov (indexed) [DOE]

Remediation - July 2010 Independent Activity Report, Savannah River Remediation - July 2010 July 2010 Savannah River Operations Office Integrated Safety Management System Phase II...

111

Independent Oversight Inspection, Savannah River Site, Summary...  

Broader source: Energy.gov (indexed) [DOE]

Savannah River Site, Summary Report - February 2004 February 2004 Inspection of Environment, Safety, and Health Management and Emergency Management at the Savannah River Site...

112

Savannah River Site Homepage  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7/2014 7/2014 SEARCH GO News Releases Video Releases Upcoming Events 12.31.13 Dr. Sam Fink Earns Donald Orth Lifetime Achievement Award 12.31.13 Savannah River Remediation Issues Fiscal Year 2013 Annual Report 12.18.13 Prototype System Brings Advantages of Wireless Technology to Secure Environment CLICK HERE FOR ADDITIONAL NEWS RELEASES CLICK HERE for our email news service, govDELIVERY 2013 PMI Project of the Year Award - Click to play on YouTube 2013 PMI Project of the Year Award Finalist: SRS Recovery Act Project PLAY VIDEO CLICK HERE FOR ADDITIONAL VIDEO RELEASES Enterprise.SRS - Safety and Security begin with me! SRS Status & Emergency Information * Cold War Patriot's Resource Fair - Aiken, SC (04.25.13) * 3rd Annual Small Modular Reactor Conference - Columbia, SC (04.16-17.13)

113

Wood River Levee Reconstruction, Madison County, IL  

E-Print Network [OSTI]

Wood River Levee Reconstruction, Madison County, IL 25 October 2006 Abstract: The recommended plan provides for flood damage reduction and restores the original degree of protection of the Wood River Levee-federal sponsor is the Wood River Drainage and Levee District. The Wood River Levee System was authorized

US Army Corps of Engineers

114

The Columbia River Estuary the Columbia River Basin  

E-Print Network [OSTI]

" fish and wildlife in the Columbia River as affected by development and operation of the hydroelectric modified in terms of physical and biological processes. The development and operation of the hydroelectric

115

SAVANNAH RIVER SITE A PUIIUCATION OF THE SAVANNAII RIVER ECOI"OGY LAIIORATORY  

E-Print Network [OSTI]

OF THE SAVANNAH RIVER SITE A PUIIUCATION OF THE SAVANNAII RIVER ECOI"OGY LAIIORATORY NATIONAL of the Savannah River Site National Environmental Research Park Program Publication number: SRO-NERP-2S Printed OF THE SAVANNAH RIVER SITE BY CHARLES E. DAVIS AND LAURA L. JANECEK A PUBLICATION OF THE SAVANNAH RIVER SITE

Georgia, University of

116

Categorical Exclusion Determinations: Bonneville Power Administration |  

Broader source: Energy.gov (indexed) [DOE]

June 8, 2010 June 8, 2010 CX-003092: Categorical Exclusion Determination Ross-Lexington Number 1 New Access Road Construction: 15/1 to 15/2 CX(s) Applied: B1.13 Date: 06/08/2010 Location(s): Clark County, Washington Office(s): Bonneville Power Administration June 8, 2010 CX-002771: Categorical Exclusion Determination Marion and Sand Springs Substations Radio Tower Projects CX(s) Applied: B1.19 Date: 06/08/2010 Location(s): Marion, Oregon Office(s): Bonneville Power Administration June 4, 2010 CX-002773: Categorical Exclusion Determination Idaho Department of Fish and Game Purchase of Crystal Springs Trout Farm - Snake River Sockeye Captive Propagation Program CX(s) Applied: A7 Date: 06/04/2010 Location(s): Springfield, Idaho Office(s): Bonneville Power Administration June 3, 2010

117

Microsoft Word - Springfield_CX.doc  

Broader source: Energy.gov (indexed) [DOE]

0 0 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Greg Baesler Project Manager - KEWU-4 Proposed Action: Provision of funds to Idaho Department of Fish and Game for purchase of 72.53 acres known as the Crystal Springs Trout Farm property under the Snake River Sockeye Captive Propagation Program. Fish and Wildlife Project Number: 2007-402-00, Contract # BPA-005203 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): A.7 - Transfer, lease, disposition or acquisition of interests in personal property (e.g., equipment and materials) or real property (e.g., permanent structures and land), if property use is to remain unchanged i.e., the type and magnitude of impacts would remain essentially the same.

118

Caney River | Open Energy Information  

Open Energy Info (EERE)

River River Jump to: navigation, search Name Caney River Facility Caney River Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Enel Green Power North America Inc. Developer Tradewind Energy LLC Energy Purchaser Tennessee Valley Authority Location Elk County KS Coordinates 37.448424°, -96.425027° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.448424,"lon":-96.425027,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

119

Marble River | Open Energy Information  

Open Energy Info (EERE)

River River Jump to: navigation, search Name Marble River Facility Marble River Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner EDP Renewables North America LLC Developer EDP Renewables North America LLC Energy Purchaser Merchant Location Churubusco NY Coordinates 44.9406848°, -73.9303307° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.9406848,"lon":-73.9303307,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

120

Missouri River Institute Research Symposium  

E-Print Network [OSTI]

.S. Army Corps of Engineers) Corps of Engineers Outreach and Education Programs 11:00 Dan Catlin (Virginia and Pesticides on Amphibians Along the 59-Mile Reach of the Missouri River Posters from various individuals

Sweeney, Mark R.

Note: This page contains sample records for the topic "river sockeye captive" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Two-dimensional river modeling  

E-Print Network [OSTI]

flow conditions. This thesis investigates the application of a recently developed two- dimensional river model system. The microcomputer version of FESWMS-2DH was developed for the Federal Highway Administration by the U. S. Geological Survey. Four... simulations are used to examine the performance of the two- dimensional river modeling system: flow in a simple channel, flow in a strongly curved channel bend, flow in a meandering creek, and flow in Buckhorn Creek, a single opening bridge crossing of a...

Thompson, James Cameron

2012-06-07T23:59:59.000Z

122

Comments of the Lower Colorado River Authority | Department of...  

Broader source: Energy.gov (indexed) [DOE]

the Lower Colorado River Authority Comments of the Lower Colorado River Authority Comments of the Lower Colorado River Authority on Implementing the National Broadband Plan by...

123

Flambeau River Papers Makes a Comeback with a Revised Energy...  

Office of Environmental Management (EM)

ITP LEADER Case Study: Flambeau River Papers Makes a Comeback With a Revised Energy Strategy Flambeau River Biofuels Demonstration-Scale Biorefinery FlambeauRiverBiofuels.pdf...

124

ITP LEADER Case Study: Flambeau River Papers Makes a Comeback...  

Office of Environmental Management (EM)

Documents & Publications Flambeau River Papers Makes a Comeback with a Revised Energy Strategy Flambeau River Biofuels Demonstration-Scale Biorefinery FlambeauRiverBiofuels.pdf...

125

EA-1692: Red River Environmental Products, LLC Activated Carbon...  

Broader source: Energy.gov (indexed) [DOE]

2: Red River Environmental Products, LLC Activated Carbon Manufacturing Facility, Red River Parish, LA EA-1692: Red River Environmental Products, LLC Activated Carbon Manufacturing...

126

Enforcement Documents - Savannah River Site | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

the Savannah River Site (EA-2000-08) June 7, 2000 Enforcement Letter, Savannah River Ecology Laboratory - June 7, 2000 Issued to Savannah River Ecology Laboratory related to...

127

Grande Ronde Endemic Spring Chinook Salmon Supplementation Program : Facility Operation and Maintenance Facilities, Annual Report 2003.  

SciTech Connect (OSTI)

Anadromous salmonid stocks have declined in both the Grande Ronde River Basin (Lower Snake River Compensation Plan (LSRCP) Status Review Symposium 1998) and in the entire Snake River Basin (Nehlsen et al. 1991), many to the point of extinction. The Grande Ronde River Basin historically supported large populations of fall and spring chinook (Oncorhynchus tshawytscha), sockeye (O. nerka), and coho (O. kisutch) salmon and steelhead trout (O. mykiss) (Nehlsen et al. 1991). The decline of chinook salmon and steelhead populations and extirpation of coho and sockeye salmon in the Grande Ronde River Basin was, in part, a result of construction and operation of hydroelectric facilities, over fishing, and loss and degradation of critical spawning and rearing habitat in the Columbia and Snake River basins (Nehlsen et al. 1991). Hatcheries were built in Oregon, Washington and Idaho under the Lower Snake River Compensation Plan (LSRCP) to compensate for losses of anadromous salmonids due to the construction and operation of the lower four Snake River dams. Lookingglass Hatchery (LGH) on Lookingglass Creek, a tributary of the Grande Ronde River, was completed under LSRCP in 1982 and has served as the main incubation and rearing site for chinook salmon programs for Grande Ronde and Imnaha rivers in Oregon. Despite these hatchery programs, natural spring chinook populations continued to decline resulting in the National Marine Fisheries Service (NMFS) listing Snake River spring/summer chinook salmon as ''threatened'' under the federal Endangered Species Act (1973) on 22 April 1992. Continuing poor escapement levels and declining population trends indicated that Grande Ronde River basin spring chinook salmon were in imminent danger of extinction. These continuing trends led fisheries co-managers in the basin to initiate the Grande Ronde Endemic Spring Chinook Salmon Supplementation Program (GRESCSSP) in order to prevent extinction and preserve options for use of endemic fish stocks in future artificial propagation programs. The GRESCSSP was implemented in three Grande Ronde River basin tributaries; the Lostine and upper Grande Ronde rivers and Catherine Creek. The GRESCSSP employs two broodstock strategies utilizing captive and conventional brood sources. The captive brood program began in 1995, with the collection of parr from the three tributary areas. The conventional broodstock component of the program began in 1997 with the collection of natural adults returning to these tributary areas. Although LGH was available as the primary production facility for spring chinook programs in the Grande Ronde Basin, there were never any adult or juvenile satellite facilities developed in the tributary areas that were to be supplemented. An essential part of the GRESCSSP was the construction of adult traps and juvenile acclimation facilities in these tributary areas. Weirs were installed in 1997 for the collection of adult broodstock for the conventional component of the program. Juvenile facilities were built in 2000 for acclimation of the smolts produced by the captive and conventional broodstock programs and as release sites within the natural production areas of their natal streams. The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) operate both the juvenile acclimation and adult trapping facilities located on Catherine Creek and the upper Grande Ronde River under this project. The Nez Perce Tribe (NPT) operate the facilities on the Lostine River under a sister project. Hatcheries were also built in Oregon, Washington and Idaho under the LSRCP to compensate for losses of summer steelhead due to the construction and operation of the lowest four Snake River dams. Despite these harvest-driven hatchery programs, natural summer steelhead populations continued to decline as evidenced by declining counts at Lower Granite Dam since 1995 (Columbia River Data Access in Real Time, DART) and low steelhead redd counts on index streams in the Grande Ronde Basin. Because of low escapement the Snake River summer steelhead were listed as threat

McLean, Michael L.; Seeger, Ryan; Hewitt, Laurie (Confederated Tribes of the Umatilla Indian Reservation, Department of Natural Resources, Pendleton, OR)

2004-01-01T23:59:59.000Z

128

Canadian River Compact (Texas) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Canadian River Compact (Texas) Canadian River Compact (Texas) Canadian River Compact (Texas) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Water Buying & Making Electricity Home Weatherization Program Info State Texas Program Type Siting and Permitting Provider Canadian River Compact Commission The Canadian River Commission administers the Canadian River Compact which includes the states of New Mexico, Oklahoma, and Texas. Signed in 1950 by

129

Savannah River Site | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Savannah River Site Savannah River Site Savannah River Site Savannah River Site | June 2011 Aerial View Savannah River Site | June 2011 Aerial View Savannah River Site (SRS) has mission responsibilities in nuclear weapons stockpile stewardship by ensuring the safe and reliable management of tritium resources; by contributing to the stockpile surveillance program; and by assisting in the development of alternatives for large-scale pit disassembly/conversion capability. SRS also manages excess nuclear materials and supports nuclear nonproliferation initiatives. Environmental stewardship activities include the management, treatment, and disposal of radioactive, hazardous, and mixed wastes. Enforcement April 13, 2010 Consent Order, Parsons Infrastructure & Technology Group, Inc. -

130

Deep drilling data, Raft River geothermal area, Idaho-Raft River geothermal  

Open Energy Info (EERE)

Deep drilling data, Raft River geothermal area, Idaho-Raft River geothermal Deep drilling data, Raft River geothermal area, Idaho-Raft River geothermal exploration well sidetrack-C Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Report: Deep drilling data, Raft River geothermal area, Idaho-Raft River geothermal exploration well sidetrack-C Details Activities (1) Areas (1) Regions (0) Abstract: Cassia County Idaho; data; geophysical surveys; Idaho; Raft River geothermal area; surveys; United States; USGS; Well No. 3; well-logging Author(s): Covington, H.R. Published: Open-File Report - U. S. Geological Survey, 1/1/1978 Document Number: Unavailable DOI: Unavailable Exploratory Well At Raft River Geothermal Area (1977) Raft River Geothermal Area Retrieved from "http://en.openei.org/w/index.php?title=Deep_drilling_data,_Raft_River_geothermal_area,_Idaho-Raft_River_geothermal_exploration_well_sidetrack-C&oldid=473365"

131

VIRUS DISEASE OF SOCKEYE SALMON Interim Report  

E-Print Network [OSTI]

pattern turin an epizootic Distribution 01 LnJ I i i-h in ha-. Symptomatology Factors possibly corr Demonstration of causative agent 21 Infectious nature 21 Filterability 21 Effect of storage 21 Effect of heat 23 caused severe losses in 3- to 12-month-old fingerling sock- eye salmon in hatcheries in the State

132

Government 'confusion' is harming sockeye salmon  

Science Journals Connector (OSTI)

... The DFO is planning to spend $70 million by 2013 to promote the competitiveness of Canadian aquaculture, while at the same time it is about to lay off ... Prime Minister Stephen Harper for amending the federal Fisheries Act in June to remove key provisions protecting the habitat of wild fish. The few protections that remain are only for ...

Gayathri Vaidyanathan

2012-11-02T23:59:59.000Z

133

Savannah River National Laboratory - Home  

Broader source: All U.S. Department of Energy (DOE) Office Webpages

SRNL Logo SRNL and DOE logo art SRNL Logo SRNL and DOE logo art Top Menu Bar SRNL Update: Embassy Fellows Report A report co-authored by Savannah River National Laboratory Senior Advisory Engineer, Dr. Robert Sindelar, has been released. The report to the Government of Japan - Ministry of the Environment provides observations and recommendations on decontamination work and progress... >>MORE Portable Power Research at SRNL Hadron Technologies, Inc., a microwave technology and systems development and manufacturing company with offices in Tennessee and Colorado, has signed a license for a Hybrid Microwave and Off-Gas Treatment System developed by the Savannah River National Laboratory, the Department of Energy's applied science laboratory located at the Savannah River Site. >>MORE

134

Savannah River Tank Waste Residuals  

Broader source: Energy.gov (indexed) [DOE]

Savannah Savannah River Savannah River Tank Waste Residuals HLW Corporate Board November 6, 2008 1 November 6, 2008 Presentation By Sherri R. Ross Department of Energy Savannah River Operations Office The Issue * How clean is clean? * Ultimate Challenge - Justify highly radioactive radionuclides have been removed to the maximum extent practical? 2 removed to the maximum extent practical? - Building compelling regulatory documentation that will withstand intense scrutiny §3116 Requirements 1. Does not require disposal in deep geological repository 2. Highly radioactive radionuclides removed to the maximum extent practical 3. Meet the performance objectives in 10 CFR Part 3 3. Meet the performance objectives in 10 CFR Part 61, Subpart C 4. Waste disposed pursuant to a State-approved closure plan or permit Note: If it is anticipated that Class C disposal limits will be exceeded, additional

135

Snake River Geothermal Project - Innovative Approaches to Geothermal...  

Broader source: Energy.gov (indexed) [DOE]

Snake River Geothermal Project - Innovative Approaches to Geothermal Exploration Snake River Geothermal Project - Innovative Approaches to Geothermal Exploration DOE Geothermal...

136

Enforcement Letter, Savannah River Ecology Laboratory- June 7, 2000  

Broader source: Energy.gov [DOE]

Issued to Savannah River Ecology Laboratory related to Radioactive Material Control Deficiencies at the Savannah River Site

137

Flambeau River Biofuels | Open Energy Information  

Open Energy Info (EERE)

Flambeau River Biofuels Flambeau River Biofuels Jump to: navigation, search Name Flambeau River Biofuels Place Park Falls, Wisconsin Sector Biomass Product A subsidiary of Flambeau River Papers LLC that plans to develop a Fischer Tropsch diesel project in Park Falls, Wisconsin that will process residual wood biomass from forest and agricultural sources. References Flambeau River Biofuels[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Flambeau River Biofuels is a company located in Park Falls, Wisconsin . References ↑ "Flambeau River Biofuels" Retrieved from "http://en.openei.org/w/index.php?title=Flambeau_River_Biofuels&oldid=345407" Categories: Clean Energy Organizations

138

Youghiogheny Wild and Scenic River (Maryland)  

Broader source: Energy.gov [DOE]

Portions of the Youghiogheny River are protected under the Scenic and Wild Rivers Act, and development on or near these areas is restricted. COMAR section 08.15.02 addresses permitted uses and...

139

Salinity Gradient Energy at River Mouths  

Science Journals Connector (OSTI)

Salinity Gradient Energy at River Mouths ... River mouths are potentially abundant locations for the exploitation of the clean and renewable salinity gradient energy (SGE) as here perpetually fresh water mixes with saline seawater. ...

Oscar Alvarez-Silva; Christian Winter; Andres F. Osorio

2014-09-03T23:59:59.000Z

140

Critical wavelength for river meandering  

Science Journals Connector (OSTI)

A fully nonlinear modal analysis identifies a critical centerline wave number qc for river meandering that separates long-wavelength bends, which grow to cutoff, from short-wavelength bends, which decay. Exact, numerical, and approximate analytical results for qc rely on the Ikeda, Parker, and Sawai [J. Fluid Mech. 112, 363 (1981)] model, supplemented by dynamical equations that govern the river migration and length. Predictions also include upvalley bend migration at long times and a peak in lateral migration rates at intermediate times. Experimental tests are suggested.

Boyd F. Edwards and Duane H. Smith

2001-03-28T23:59:59.000Z

Note: This page contains sample records for the topic "river sockeye captive" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Wild and Scenic Rivers | Open Energy Information  

Open Energy Info (EERE)

Retrieved from "http:en.openei.orgwindex.php?titleWildandScenicRivers&oldid612228" Category: NEPA Resources...

142

Columbia River Component Data Evaluation Summary Report  

SciTech Connect (OSTI)

The purpose of the Columbia River Component Data Compilation and Evaluation task was to compile, review, and evaluate existing information for constituents that may have been released to the Columbia River due to Hanford Site operations. Through this effort an extensive compilation of information pertaining to Hanford Site-related contaminants released to the Columbia River has been completed for almost 965 km of the river.

C.S. Cearlock

2006-08-02T23:59:59.000Z

143

Bayer Material Science (TRL 1 2 3 System)- River Devices to Recover Energy with Advanced Materials(River DREAM)  

Broader source: Energy.gov [DOE]

Bayer Material Science (TRL 1 2 3 System) - River Devices to Recover Energy with Advanced Materials(River DREAM)

144

SRO -NERP-1 THE SAVANNAH RIVER PLANT  

E-Print Network [OSTI]

AND TREATMENT by Whit Gibbons Savannah River Ecology Laboratory Aiken , South Carolina A PUBLICATION OF EROA 'S SAVANNAH RIVER NATIONAL ENVIRONMENTAL RESEARCH PARK -SEPTEMBER 1977 COPIES MAY BE OBTAINEO FROM SAVANNAHSRO -NERP-1 SNAKES OF THE SAVANNAH RIVER PLANT WITH INFORMATION ABOUT SNAKEBITE PREVENTION

Georgia, University of

145

Atlas of the Columbia River Basin  

E-Print Network [OSTI]

#12;Atlas of the Columbia River Basin Oregon State University Computer-Assisted Cartography Course & GEOVISUALIZATION GROUP UNIVERSITY #12;2013 Oregon State University Atlas of the Columbia River Basin FOREWORDAtlas, Montana, Nevada, Wyoming, and Utah. 2013 Oregon State University Atlas of the Columbia River Basin

Jenny, Bernhard

146

Resilience of river flow regimes  

Science Journals Connector (OSTI)

...Junk WJ Bayley PB Sparks RE ( 1989 ) The flood pulse concept in river-floodplain systems...F Ward JV ( 2000 ) An extension of the flood pulse concept...ZZQQhy2011 Bisbee (AZ) Bisbee (AZ) Summer Boulder Creek Arizona (United States) 98 1984...

Gianluca Botter; Stefano Basso; Ignacio Rodriguez-Iturbe; Andrea Rinaldo

2013-01-01T23:59:59.000Z

147

Resilience of river flow regimes  

Science Journals Connector (OSTI)

...Junk WJ Bayley PB Sparks RE ( 1989 ) The flood pulse concept in river-floodplain systems...F Ward JV ( 2000 ) An extension of the flood pulse concept...summer, autumn, winter Vallecito Creek Colorado (United States) 188 1963 ZZQQhy1997...

Gianluca Botter; Stefano Basso; Ignacio Rodriguez-Iturbe; Andrea Rinaldo

2013-01-01T23:59:59.000Z

148

Independent Activity Report, Washington River Protection Solutions -  

Broader source: Energy.gov (indexed) [DOE]

Washington River Protection Solutions Washington River Protection Solutions - September 2010 Independent Activity Report, Washington River Protection Solutions - September 2010 September 2010 Participation in the Washington River Protection Solutions, LLC Integrated Safety Management System Annual Review The U.S. Department of Energy, Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), participated in the review of the Washington River Protection Solutions, LLC Integrated Safety Management System Annual Review for 2010. The review was conducted during the period of August 23 to September 2, 2010, and focused on six functional areas: corrective action management, work planning and control, radiological protection, environmental protection, emergency preparedness, and

149

Daedalus: Free captive fish  

Science Journals Connector (OSTI)

... The fishing industry is approaching a crisis. Once-rich ... industry is approaching a crisis. Once-rich fishing grounds such as the Grand Banks off Newfoundland are denuded; important species such as ...

David Jones

1998-03-19T23:59:59.000Z

150

Schlumberger soundings in the Upper Raft River and Raft River Valleys,  

Open Energy Info (EERE)

soundings in the Upper Raft River and Raft River Valleys, soundings in the Upper Raft River and Raft River Valleys, Idaho and Utah Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Report: Schlumberger soundings in the Upper Raft River and Raft River Valleys, Idaho and Utah Details Activities (1) Areas (1) Regions (0) Abstract: In 1975, the U.S. Geological Survey made seventy Schlumberger resistivity soundings in the Upper Raft River Valley and in parts of the Raft River Valley. These soundings complement the seventy-nine soundings made previously in the Raft River Valley (Zohdy and others, 1975) and bring the total number of soundings to 149. This work was done as part of a hydrogeologic study of the area. The location, number, and azimuth of all 149 Schlumberger sounding stations are presented. The location of the new

151

G. A. Antaki Westinghouse Savannah River Company Savannah River Site  

Office of Scientific and Technical Information (OSTI)

W S R C: M S- 9 5 -0 0 0 8 W S R C: M S- 9 5 -0 0 0 8 Analytical Considerations in the Code Qualification of Piping Systems (U) by G. A. Antaki Westinghouse Savannah River Company Savannah River Site Aiken, South Carolina 29808 DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or respnsi- bility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Refer- ence herein to any specific commercial product, process, or service by trade name, trademark,

152

Independent Activity Report, Savannah River Operation - June 2010 |  

Broader source: Energy.gov (indexed) [DOE]

Savannah River Operation - June 2010 Savannah River Operation - June 2010 Independent Activity Report, Savannah River Operation - June 2010 June 2010 Savannah River Operations Office Self-Assessment of the Technical Qualification Program The U.S. Department of Energy (DOE), Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), participated in the DOE Savannah River Operations Office (DOE-SR) self-assessment of the Technical Qualification Program (TQP). Independent Activity Report, Savannah River Operation - June 2010 More Documents & Publications Independent Oversight Review, Savannah River Operations Office - July 2013 Independent Activity Report, Savannah River Remediation - July 2010 2011 Annual Workforce Analysis and Staffing Plan Report - Savannah River

153

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

Savannah River Operations Savannah River Operations Office Categorical Exclusion Determinations: Savannah River Operations Office Categorical Exclusion Determinations issued by Savannah River Operations Office. DOCUMENTS AVAILABLE FOR DOWNLOAD September 10, 2013 CX-010669: Categorical Exclusion Determination 484-17D Coal Yard Remediation CX(s) Applied: B6.1 Date: 06/07/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office August 1, 2013 CX-010837: Categorical Exclusion Determination Disassembly, Relocation, and Reassembly of a Metal-framed Quonset Hut CX(s) Applied: B1.22 Date: 08/01/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office August 1, 2013 CX-010836: Categorical Exclusion Determination Subcontractor Roof Repair at 717-12S CX(s) Applied: B1.3

154

The Columbia River System : the Inside Story.  

SciTech Connect (OSTI)

The Columbia Ricer is one of the greatest natural resources in the western United States. The river and its tributaries touch the lives of nearly every resident of the Northwest-from providing the world-famous Pacific salmon to supplying the clean natural fuel for over 75 percent of the region's electrical generation. Since early in the century, public and private agencies have labored to capture the benefits of this dynamic river. Today, dozens of major water resource projects throughout the region are fed by the waters of the Columbia Basin river system. And through cooperative efforts, the floods that periodically threaten developments near the river can be controlled. This publication presents a detailed explanation of the planning and operation of the multiple-use dams and reservoirs of the Columbia River system. It describes the river system, those who operate and use it, the agreements and policies that guide system operation, and annual planning for multiple-use operation.

United States. Bonneville Power Administration.

1991-09-01T23:59:59.000Z

155

Wing River Wind Farm | Open Energy Information  

Open Energy Info (EERE)

River Wind Farm River Wind Farm Jump to: navigation, search Name Wing River Wind Farm Facility Wing River Wind Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Wing River Wind Farm Developer Wing River Wind Farm Location Hewitt MN Coordinates 46.3254°, -95.0864° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":46.3254,"lon":-95.0864,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

156

DOE to Extend Savannah River Nuclear Solutions Contract at Savannah River  

Broader source: Energy.gov (indexed) [DOE]

to Extend Savannah River Nuclear Solutions Contract at Savannah to Extend Savannah River Nuclear Solutions Contract at Savannah River Site to September 2016 DOE to Extend Savannah River Nuclear Solutions Contract at Savannah River Site to September 2016 September 6, 2012 - 12:00pm Addthis Media Contact Bill Taylor 803-952-8564 bill.taylor@srs.gov Aiken, SC -- The Department of Energy's (DOE) Savannah River Operations Office today exercised its option to extend the current Savannah River Site Management and Operating contract with Savannah River Nuclear Solutions, LLC (SRNS) for an additional 38 months, from August 1, 2013 to September 2016. The SRNS contract was competatviely awareded January 10, 2008. The total value of the SRNS contract with the extension is approximately $8 billion. The current contract provides for management and operations of Savannah

157

Green River Locks and Dams 3, 4, 5, 6 and Barren River Lock and Dam 1 Disposition, Kentucky  

E-Print Network [OSTI]

Green River Locks and Dams 3, 4, 5, 6 and Barren River Lock and Dam 1 Disposition, Kentucky 16 September 2014 ABSTRACT: Green River Locks and Dams 3 through 6 and Barren River Lock and Dam 1 were. The Green River Locks and Dams 5 and 6 ceased operations in 1951 due to a marked decline in navigation

US Army Corps of Engineers

158

River Corridor Closure Project Partnering Performance Agreement...  

Office of Environmental Management (EM)

- March 2009 Voluntary Protection Program Onsite Review, River Corridor Closure Project - June 2012 Indoctrinating Subcontractors into the DOE Safety Culture and Expectations...

159

Savannah River National Laboratory Technologies Available for...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Available for Licensing The Savannah River National Laboratory (SRNL) "Puts Science to Work" to create and deploy practical, high-value, cost effective technology solutions. In...

160

Savannah River Laboratory monthly report, September 1991  

SciTech Connect (OSTI)

This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation, tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

Ferrell, J.M. [comp.

1991-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "river sockeye captive" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Home | Savannah River Ecology Laboratory Environmental Outreach...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the public about the diverse ecological research conducted by scientists at the Savannah River Ecology Laboratory. Today, the Outreach Program continues to provide a great variety...

162

Savannah River Remediation (SRR) Expanded Staff Meeting  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Savannah River Remediation Delivering the Mission Dave Olson President and Project Manager January 27, 2012 SRS Executive Management Community Discussion 2 * Liquid Waste Funding...

163

Kimberly Andrews | Savannah River Ecology Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Andrews with kingsnake Curriculum Vitae Faculty & Scientists SREL Home SREL Herpetology Kimberly Andrews Savannah River Ecology Laboratory P O Drawer E, Aiken, SC 29802 (803)...

164

Kurt Buhlmann | Savannah River Ecology Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Buhlmann Curriculum Vitae Faculty & Scientists SREL Home SREL Herpetology Kurt A. Buhlmann Savannah River Ecology Laboratory P O Drawer E, Aiken, SC 29802 (803) 725-5293 office...

165

J. Whitfield Gibbons | Savannah River Ecology Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Gibbons Curriculum Vitae Faculty & Scientists SREL Home SREL Herpetology J. Whitfield Gibbons Savannah River Ecology Laboratory P O Drawer E, Aiken, SC 29802 (803) 725-5852 ...

166

Justin D. Congdon | Savannah River Ecology Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Congdon Curriculum Vitae Faculty & Scientists SREL Home SREL Herpetology Justin D. Congdon Savannah River Ecology Laboratory P O Drawer E, Aiken, SC 29802 (803) 725-5341 office...

167

The Columbia River System Inside Story  

SciTech Connect (OSTI)

The Columbia River is one of the greatest natural resources in the western United States. The river and its tributaries touch the lives of nearly every resident of the Pacific Northwestfrom fostering world-famous Pacific salmon to supplying clean natural fuel for 50 to 65 percent of the regions electrical generation. Since early in the 20th century, public and private agencies have labored to capture the benefits of this dynamic river. Today, dozens of major water resource projects throughout the region are fed by the waters of the Columbia Basin river system.

none,

2001-04-01T23:59:59.000Z

168

Workplace Charging Challenge Partner: Salt River Project  

Broader source: Energy.gov [DOE]

The mission of Salt River Project's (SRP) Electric Vehicle Initiative is to encourage greater use of clean energy transportation. Under this program, SRP's headquarters received two Level 2...

169

Conference Center | Savannah River Ecology Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Conference Center front view UGA-SREL Conference Center large conference room Large conference room small conference room Small conference room The Savannah River Ecology...

170

Savannah River Needs Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

and concerns for the site. Savannah River Needs Assessment More Documents & Publications Oak Ridge Reservation Needs Assessment Oak Ridge Y-12 and ORNL Needs Assessment Former...

171

For the Federal Columbia River Power System  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

its products and services . BPA markets wholesale electrical power from 31 federal hydro projects in the Columbia River Basin, one nonfederal nuclear plant and several small...

172

Savannah River Laboratory monthly report, November 1991  

SciTech Connect (OSTI)

This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation; tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

Ferrell, J.M. (comp.)

1991-01-01T23:59:59.000Z

173

Savannah River Laboratory monthly report, November 1991  

SciTech Connect (OSTI)

This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation; tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

Ferrell, J.M. [comp.

1991-12-31T23:59:59.000Z

174

Wild and Scenic Rivers Act (Maryland)  

Broader source: Energy.gov [DOE]

It is state policy to protect the outstanding scenic, geologic, ecologic, historic, recreational, agricultural, fish, wildlife, cultural, and other similar values of certain rivers and adjacent...

175

Savannah River Laboratory monthly report, August 1991  

SciTech Connect (OSTI)

This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation, tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

Ferrell, J.M. (comp.)

1991-01-01T23:59:59.000Z

176

Savannah River Laboratory monthly report, August 1991  

SciTech Connect (OSTI)

This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation, tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

Ferrell, J.M. [comp.

1991-12-31T23:59:59.000Z

177

PIA - Savannah River Remediation Accreditation Boundary (SRR...  

Office of Environmental Management (EM)

PIA - Savannah River Nuclear Solution IBARS Srs Site Apps. Accreditation Boundary PIA - WEB Physical Security Major Application Occupational Medical Surveillance System (OMSS)...

178

The Columbia River System: Inside Story  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Falls Little Wood Reservoir Idaho Falls (City Plant) Idaho Falls (Lower Plant) Idaho Falls (Upper Plant) Ponds Lodge Ashton St. Anthony Felt Gem State Portneuf River Billingsley...

179

Root River Energy LLC | Open Energy Information  

Open Energy Info (EERE)

search Name: Root River Energy LLC Place: Minnesota Zip: 55961 Sector: Renewable Energy, Wind energy Product: Minesota-based wind development company tasked with developing...

180

Sandia National Laboratories: river current energy converters  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

is a partnered effort to develop marine hydrokinetic (MHK) reference models (RMs) for wave energy converters and tidal, ocean, and river current energy converters. The RMP team...

Note: This page contains sample records for the topic "river sockeye captive" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Manchester Spring Chinook Broodstock Project, 1998-1999 Annual Report.  

SciTech Connect (OSTI)

This yearly report concerned facilities upgrade and endangered Snake River spring/summer chinook salmon captive broodstock rearing.

McAuley, W.Carlin; Wastel, Michael R.; Flagg, Thomas A. (Northwest and Alaska Fisheries Science Center, Coastal Zone and Estuarine Studies Division, Seattle, WA)

2000-02-01T23:59:59.000Z

182

Upper White River Watershed Alliance Upper White River Watershed Alliance (UWRWA)  

E-Print Network [OSTI]

Upper White River Watershed Alliance Upper White River Watershed Alliance (UWRWA) P.O. Box 2065 integrity of the White River ecosystem. To successfully accomplish the vision of UWRWA, a 16-county was formed. It exists to improve and protect water quality on a watershed basis in the larger Upper White

183

Comparative Evaluation of Generalized River/Reservoir System Models  

E-Print Network [OSTI]

This report reviews user-oriented generalized reservoir/river system models. The terms reservoir/river system, reservoir system, reservoir operation, or river basin management "model" or "modeling system" are used synonymously to refer to computer...

Wurbs, Ralph A.

184

Wild and Scenic Rivers Act | Open Energy Information  

Open Energy Info (EERE)

Rivers Act Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Wild and Scenic Rivers ActLegal Abstract This Act classifies rivers as...

185

Hood River Passive House, Hood River, Oregon (Fact Sheet)  

SciTech Connect (OSTI)

The Hood River Passive Project was developed by Root Design Build of Hood River Oregon using the Passive House Planning Package (PHPP) to meet all of the requirements for certification under the European Passive House standards. The Passive House design approach has been gaining momentum among residential designers for custom homes and BEopt modeling indicates that these designs may actually exceed the goal of the U.S. Department of Energy's (DOE) Building America program to "reduce home energy use by 30%-50%" (compared to 2009 energy codes for new homes). This report documents the short term test results of the Shift House and compares the results of PHPP and BEopt modeling of the project. The design includes high R-Value assemblies, extremely tight construction, high performance doors and windows, solar thermal DHW, heat recovery ventilation, moveable external shutters and a high performance ductless mini-split heat pump. Cost analysis indicates that many of the measures implemented in this project did not meet the BA standard for cost neutrality. The ductless mini-split heat pump, lighting and advanced air leakage control were the most cost effective measures. The future challenge will be to value engineer the performance levels indicated here in modeling using production based practices at a significantly lower cost.

Not Available

2014-02-01T23:59:59.000Z

186

Pecos River Ecosystem Monitoring Project  

E-Print Network [OSTI]

2003 growing seasons, showing higher river flow during the 2001 irrigation season compared to 2002 or 2003. 3 4 5 6 7 8 9 10 11 Water Level (ft.) B4r 2001 B4r 2002 B4r 2003 JuneMayApril July August September October November 159... it to dS/m. The number is then multiplied by 640 making the number equivalent to ppm. A control using reagent-water was also performed here. Additionally, electrical conductivity measurements were made at two sites near Mentone, Texas...

McDonald, A.; Hart, C.

2004-01-01T23:59:59.000Z

187

Lesson Learned by Savannah River Site Activity-level Work Planning and Control  

Broader source: Energy.gov [DOE]

Slide Presentation by Bonnie Barnes, Savannah River Remediation. Work Planning and Control at Savannah River Remediation.

188

Oversight Reports - Savannah River Site | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

April 22, 2013 Independent Activity Report, Savannah River Site - March 2013 Oversight Scheduling an Operational Awareness at the Savannah River Site HIAR-SRS-2013-03-25...

189

Oversight Reports - Savannah River Site | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

December 9, 2009 Independent Oversight Inspection, Savannah River Site Office - December 2009 Inspection of Nuclear Safety at the Savannah River Site Office and the Tritium Program...

190

U.S. DEPARTMENT OF ENERGY * SAVANNAH RIVER ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Carbon Flux Measurements Super Site at Savannah River National Laboratory The Savannah River National Laboratory (SRNL) Carbon Flux Super Site provides a unique resource for...

191

Independent Oversight Follow-up Review, Savannah River National...  

Broader source: Energy.gov (indexed) [DOE]

Savannah River National Laboratory - January 2012 Independent Oversight Follow-up Review, Savannah River National Laboratory - January 2012 January 2012 Follow-up Review of...

192

Independent Activity Report, Savannah River Site - May 2010 ...  

Broader source: Energy.gov (indexed) [DOE]

May 2010 Independent Activity Report, Savannah River Site - May 2010 May 2010 Savannah River Site Salt Waste Processing Facility Construction Site Walkthrough The U.S. Department...

193

Independent Activity Report, Savannah River Site - June 2010...  

Broader source: Energy.gov (indexed) [DOE]

June 2010 Independent Activity Report, Savannah River Site - June 2010 June 2010 Savannah River Site Salt Waste Processing Facility Construction Site Orientation Visit The U.S....

194

Independent Activity Report, Savannah River Site - March 2013...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Activity Report, Savannah River Site - March 2013 Independent Activity Report, Savannah River Site - March 2013 March 2013 Oversight Scheduling an Operational Awareness at the...

195

Raft River Rural Electric Coop. Vigilante Electric Coop. Northern  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Raft River Rural Electric Coop. Vigilante Electric Coop. Northern Lights Bonners Ferry East End Mutual Heyburn Burley United Electric Albion Raft River Rural Electric Coop. Declo...

196

2013 Annual Planning Summary for the Savannah River Operations...  

Office of Environmental Management (EM)

for Savannah River Operations Office 2010 Annual Planning Summary for Savannah River Operations Office (SRS) 2012 Annual Planning Summary for Bonneville Power Administration...

197

Savannah River's Biomass Steam Plant Success with Clean and Renewable...  

Broader source: Energy.gov (indexed) [DOE]

Savannah River's Biomass Steam Plant Success with Clean and Renewable Energy Savannah River's Biomass Steam Plant Success with Clean and Renewable Energy In order to meet the...

198

PIA - Savannah River Nuclear Solutions (SRNS) Human Resource...  

Office of Environmental Management (EM)

Solutions (SRNS) Human Resource Management System (HRMS) PIA - Savannah River Nuclear Solutions (SRNS) Human Resource Management System (HRMS) PIA - Savannah River Nuclear...

199

Concept Testing and Development at the Raft River Geothermal...  

Broader source: Energy.gov (indexed) [DOE]

Concept Testing and Development at the Raft River Geothermal Field, Idaho Concept Testing and Development at the Raft River Geothermal Field, Idaho DOE 2010 Geothermal Technologies...

200

Concept Testing and Development at the Raft River Geothermal...  

Broader source: Energy.gov (indexed) [DOE]

Concept Testing and Development at the Raft River Geothermal Field, Idaho Concept Testing and Development at the Raft River Geothermal Field, Idaho Concept Testing and Development...

Note: This page contains sample records for the topic "river sockeye captive" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

CRAD, Engineering - Office of River Protection K Basin Sludge...  

Broader source: Energy.gov (indexed) [DOE]

System CRAD, Emergency Management - Office of River Protection K Basin Sludge Waste System CRAD, Conduct of Operations - Office of River Protection K Basin Sludge Waste System...

202

CRAD, Conduct of Operations - Office of River Protection K Basin...  

Broader source: Energy.gov (indexed) [DOE]

Conduct of Operations - Office of River Protection K Basin Sludge Waste System CRAD, Conduct of Operations - Office of River Protection K Basin Sludge Waste System May 2004 A...

203

CRAD, Management - Office of River Protection K Basin Sludge...  

Broader source: Energy.gov (indexed) [DOE]

CRAD, Emergency Management - Office of River Protection K Basin Sludge Waste System CRAD, Conduct of Operations - Office of River Protection K Basin Sludge Waste System CRAD,...

204

CRAD, Occupational Safety & Health - Office of River Protection...  

Broader source: Energy.gov (indexed) [DOE]

K Basin Sludge Waste System CRAD, Management - Office of River Protection K Basin Sludge Waste System CRAD, Conduct of Operations - Office of River Protection K Basin Sludge Waste...

205

Enforcement Letter, Westinghouse Savannah River Company- June 4, 1996  

Broader source: Energy.gov [DOE]

Issued to Westinghouse Savannah River Company related to Potential Violations of the Quality Assurance and Occupational Radiation Protection Rules at the Savannah River Site

206

CRAD, Emergency Management - Office of River Protection K Basin...  

Broader source: Energy.gov (indexed) [DOE]

Emergency Management - Office of River Protection K Basin Sludge Waste System CRAD, Emergency Management - Office of River Protection K Basin Sludge Waste System May 2004 A section...

207

Department of Energy Cites Savannah River Nuclear Solutions for...  

Broader source: Energy.gov (indexed) [DOE]

Savannah River Nuclear Solutions for Worker Safety and Health Violations Department of Energy Cites Savannah River Nuclear Solutions for Worker Safety and Health Violations October...

208

DOE - Office of Legacy Management -- Savannah River Swamp - SC...  

Office of Legacy Management (LM)

Savannah River Swamp - SC 01 FUSRAP Considered Sites Site: Savannah River Swamp (SC.01 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site...

209

Independent Oversight Review, Savannah River Site - July 2011...  

Broader source: Energy.gov (indexed) [DOE]

Independent Oversight Review, Savannah River Site - July 2011 July 2011 Review of Electrical System Configuration Management and Design Change Control at the Savannah River...

210

Tapping the Power of Alaska's Rivers | Department of Energy  

Office of Environmental Management (EM)

a practical River In-Stream Energy Conversion (RISEC)-a device that can produce electricity from free-flowing rivers not suited to conventional hydroelectric generation, and...

211

EA-1671: Big River Substation to Poston Substation 69-Kilovolt...  

Broader source: Energy.gov (indexed) [DOE]

671: Big River Substation to Poston Substation 69-Kilovolt Transmission Line Project, Arizona and California EA-1671: Big River Substation to Poston Substation 69-Kilovolt...

212

City of Wood River, Nebraska (Utility Company) | Open Energy...  

Open Energy Info (EERE)

Page Edit with form History Facebook icon Twitter icon City of Wood River, Nebraska (Utility Company) Jump to: navigation, search Name: City of Wood River Place: Nebraska...

213

Aeromagnetic Survey At Raft River Geothermal Area (1981) | Open...  

Open Energy Info (EERE)

at the Raft River geothermal area by the USGS. References Geological Survey, Denver, CO (USA) (1 January 1981) Total field aeromagnetic map of the Raft River known Geothermal...

214

Savannah River Site Environmental Report for 1998  

SciTech Connect (OSTI)

The mission at the Savannah River Site (SRS) is focused primarily on support of the national defense, nonproliferation, and environmental cleanup. SRS-through its prime operating contractor, Westinghouse Savannah River Company-continues to maintain a comprehensive environmental monitoring program.

Arnett, M.

1999-06-09T23:59:59.000Z

215

Geomorphic histories for river and catchment management  

Science Journals Connector (OSTI)

...area, changes in water temperature or pH, or disturbances to fish migration by the construction of weirs and dams. Therefore...river catchments of Asia by Clift [35]. Using high-quality seismic records for continental margins offshore from the large rivers...

2012-01-01T23:59:59.000Z

216

CedarCreekanticlineCedarCreekanticline Yellowstone River  

E-Print Network [OSTI]

Principal Aquifer Systems in the Williston and Powder River Structural Basins, United States and Canada #12;Cover. Conceptual block diagram of groundwater flow in the Williston structural basin. #12;Conceptual Model of the Uppermost Principal Aquifer Systems in the Williston and Powder River Structural Basins

217

Wind River Conference on Prokaryotic Biology2002  

Science Journals Connector (OSTI)

...as propionate and acetate as carbon and energy sources. Sirtuin-deficient strains lack...of Wisconsin) (2). CONCLUSIONS The Wind River Conference on Prokaryotic Biology...directly to their own research. The 47th Wind River Conference will be 4 to 8 June 2003...

Kenneth W. Bayles; Neil E. Welker; Malcolm E. Winkler; Uldis N. Streips

2003-01-01T23:59:59.000Z

218

EIS-0082-S2: Savannah River Site Salt Processing, Savannah River Site,  

Broader source: Energy.gov (indexed) [DOE]

082-S2: Savannah River Site Salt Processing, Savannah River 082-S2: Savannah River Site Salt Processing, Savannah River Site, Aiken, South Carolina EIS-0082-S2: Savannah River Site Salt Processing, Savannah River Site, Aiken, South Carolina SUMMARY This SEIS evaluates the potential environmental impacts of alternatives for separating the high-activity fraction from the low-activity fraction of the high-level radioactive waste salt solutions now stored in underground tanks at the Savannah River Site (SRS) near Aiken, South Carolina. The high-activity fraction of the high-level waste (HLW) salt solution would then be vitrified in the Defense Waste Processing Facility (DWPF) and stored until it could be disposed of as HLW in a geologic repository. The low activity fraction would be disposed of as low-level waste (saltstone)

219

River Data Package for Hanford Assessments  

SciTech Connect (OSTI)

This data package documents the technical basis for selecting physical and hydraulic parameters and input values that will be used in river modeling for Hanford assessments. This work was originally conducted as part of the Characterization of Systems Task of the Groundwater Remediation Project managed by Fluor Hanford, Inc. and revised as part of the Characterization of Systems Project managed by PNNL for DOE. The river data package provides calculations of flow and transport in the Columbia River system. The module is based on the legacy code for the Modular Aquatic Simulation System II (MASS2), which is a two-dimensional, depth-averaged model that provides the capability to simulate the lateral (bank-to-bank) variation of flow and contaminants. It simulates river hydrodynamics (water velocities and surface elevations), sediment transport, contaminant transport, biotic transport, and sediment-contaminant interaction, including both suspended sediments and bed sediments. This document presents the data assembled to run the river module components for the section of the Columbia River from Vernita Bridge to the confluence with the Yakima River. MASS2 requires data on the river flow rate, downstream water surface elevation, groundwater influx and contaminants flux, background concentrations of contaminants, channel bathymetry, and the bed and suspended sediment properties. Stochastic variability for some input parameters such as partition coefficient (kd) values and background radionuclide concentrations is generated by the Environmental Stochastic Preprocessor. River flow is randomized on a yearly basis. At this time, the conceptual model does not incorporate extreme flooding (for example, 50 to 100 years) or dam removal scenarios.

Rakowski, Cynthia L.; Guensch, Gregory R.; Patton, Gregory W.

2006-08-01T23:59:59.000Z

220

Independent Oversight Inspection, Savannah River Site, Summary Report- February 2004  

Broader source: Energy.gov [DOE]

Inspection of Environment, Safety, and Health Management and Emergency Management at the Savannah River Site

Note: This page contains sample records for the topic "river sockeye captive" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Independent Oversight Inspection, Savannah River Site- December 2009  

Broader source: Energy.gov [DOE]

Inspection of Reinforced Concrete Construction at the Savannah River Site Mixed Oxide Fuel Fabrication Facility

222

Independent Oversight Review, Savannah River Site- September 2011  

Broader source: Energy.gov [DOE]

Review of the Implementation Verification Review Processes at the Savannah River Site Environmental Management Nuclear Facilities

223

Columbia-Snake River Irrigators Association Eastern Oregon Irrigators Association  

E-Print Network [OSTI]

to river flows, reservoir elevations and hydroelectric power production. Its results are currently being

224

Pecos River Watershed Protection Plan Update  

E-Print Network [OSTI]

that connects the pump, distribution tank and holding ponds. As of April 15, 2013, three of the ponds were completed and have been lined with a synthetic liner to prevent seepage and leakage as this was a major problem in early projects. Pecos River WPP...Pecos River Watershed Protection Plan Update Funding Provided by the Texas State Soil and Water Conservation Board through a Clean Water Act 319(h) Nonpoint Source Grant from the U.S Environmental Protection Agency TR-447 October 2013 Pecos River...

Gregory, L.; Hauck, L.; Blumenthal, B.; Brown, M.; Porter, A.

2013-01-01T23:59:59.000Z

225

Kootenai River Ecosystem Finding of No Significant Impact (FONSI)  

Broader source: Energy.gov (indexed) [DOE]

Kootenai River Ecosystem Kootenai River Ecosystem Finding of No Significant Impact (FONSI) June 2005 1 Department of Energy BONNEVILLE POWER ADMINISTRATION Kootenai River Ecosystem Project Finding of No Significant Impact (FONSI) Summary: Bonneville Power Administration (BPA) is proposing to fund the Kootenai River Ecosystem Project. With this funding the Kootenai Tribe of Idaho (KTOI) and Idaho Fish and Game (IDFG) would add liquid nitrogen and phosphorus to the Kootenai River from late June through September for up to five years to replace nutrients lost to the hydrosystem. The goal of this project is to help enhance native fish populations and river health. The nutrients are expected to stimulate production in the Kootenai River's

226

Oversight Reports - Savannah River Site | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Savannah River Site Savannah River Site Oversight Reports - Savannah River Site September 4, 2013 Independent Oversight Review, Savannah River Site Salt Waste Processing Facility - August 2013 Review of the Savannah River Site Salt Waste Processing Facility Safety Basis and Design Development. August 5, 2013 Independent Oversight Review, Savannah River Operations Office - July 2013 Review of the Employee Concerns Program at the Savannah River Operations Office July 25, 2013 Independent Oversight Activity Report, Savannah River Site Waste Solidification Building Savannah River Site Waste Solidification Building Corrective Actions from the January 2013 Report on Construction Quality of Mechanical Systems Installation and Fire Protection Design [HIAR SRS-2013-5-07] April 22, 2013 Independent Activity Report, Savannah River Site - March 2013

227

Savannah River Remediation Intern Sees Nuclear Industry as Job Opportunity  

Broader source: Energy.gov (indexed) [DOE]

Savannah River Remediation Intern Sees Nuclear Industry as Job Savannah River Remediation Intern Sees Nuclear Industry as Job Opportunity Savannah River Remediation Intern Sees Nuclear Industry as Job Opportunity July 9, 2012 - 10:00am Addthis Spencer Isom, second year engineering intern for Savannah River Remediation (SRR) and fourth summer at Savannah River Site (SRS), performs a standard equipment check at Saltstone Production Facility. | Photo courtesy of Savannah River Site Spencer Isom, second year engineering intern for Savannah River Remediation (SRR) and fourth summer at Savannah River Site (SRS), performs a standard equipment check at Saltstone Production Facility. | Photo courtesy of Savannah River Site Maddie M. Blair Public Affairs Intern, Savannah River Remediation Why does she keep coming back? "There are so many fascinating processes, people, and work

228

Savannah River Remediation Intern Sees Nuclear Industry as Job Opportunity  

Broader source: Energy.gov (indexed) [DOE]

Savannah River Remediation Intern Sees Nuclear Industry as Job Savannah River Remediation Intern Sees Nuclear Industry as Job Opportunity Savannah River Remediation Intern Sees Nuclear Industry as Job Opportunity July 9, 2012 - 10:00am Addthis Spencer Isom, second year engineering intern for Savannah River Remediation (SRR) and fourth summer at Savannah River Site (SRS), performs a standard equipment check at Saltstone Production Facility. | Photo courtesy of Savannah River Site Spencer Isom, second year engineering intern for Savannah River Remediation (SRR) and fourth summer at Savannah River Site (SRS), performs a standard equipment check at Saltstone Production Facility. | Photo courtesy of Savannah River Site Maddie M. Blair Public Affairs Intern, Savannah River Remediation Why does she keep coming back? "There are so many fascinating processes, people, and work

229

EIS-0241: Hood River Fisheries Program | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1: Hood River Fisheries Program 1: Hood River Fisheries Program EIS-0241: Hood River Fisheries Program SUMMARY This EIS evaluates a BPA proposal to protect and improve anadromous salmonid populations in the Hood River Basin. These actions are proposed in an attempt to mitigate the losses of fish and wildlife associated with the construction and operation of Federal hydro-power facilities in the Columbia River Basin. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD December 4, 2008 EIS-0241-SA-02: Supplement Analysis for the Hood River Fisheries Project Supplement Analysis for the Hood River Fisheries Project May 16, 2005 EIS-0241-SA-01: Supplement Analysis for the Hood River Fisheries Project, Hood River County, Oregon Supplement Analysis for the Hood River Fisheries Project

230

EA-1981: Bonneville-Hood River Transmission Line Rebuild, Multnomah and Hood River Counties, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration (BPA) is preparing an EA to assess potential environmental impacts of a proposal to rebuild its 24-mile long, 115 kilovolt Bonneville-Hood River transmission line. The existing line runs between the Bonneville Powerhouse at Bonneville Dam in Multnomah County, Oregon, and BPA's existing Hood River Substation in Hood River County, Oregon. The project would include replacing structures and conductor wires, improving access roads, and constructing new access roads or trails where needed.

231

Elk River Wind Farm | Open Energy Information  

Open Energy Info (EERE)

River Wind Farm River Wind Farm Jump to: navigation, search Name Elk River Wind Farm Facility Elk River Wind Farm Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner PPM Energy Inc Developer PPM Energy Inc Energy Purchaser Empire District Electric Co. Location Butler County KS Coordinates 37.586575°, -96.547093° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.586575,"lon":-96.547093,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

232

Three Rivers Electric Coop | Open Energy Information  

Open Energy Info (EERE)

Rivers Electric Coop Rivers Electric Coop Jump to: navigation, search Name Three Rivers Electric Coop Place Missouri Utility Id 16751 Utility Location Yes Ownership C NERC Location SERC NERC SERC Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Outdoor Lighting HPS 100 W Lighting Outdoor Lighting HPS 100 W w/Metal Pole Lighting Residential Residential Average Rates Residential: $0.0926/kWh Commercial: $0.0791/kWh Industrial: $0.0688/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=Three_Rivers_Electric_Coop&oldid=411667"

233

North Sky River | Open Energy Information  

Open Energy Info (EERE)

Sky River Sky River Jump to: navigation, search Name North Sky River Facility North Sky River Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner NextEra Energy Resources Developer NextEra Energy Resources Energy Purchaser Pacific Gas & Electric Location Tehachapi CA Coordinates 35.335578°, -118.186347° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.335578,"lon":-118.186347,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

234

New River Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

New River Geothermal Area New River Geothermal Area (Redirected from New River Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: New River Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (13) 10 References Area Overview Geothermal Area Profile Location: California Exploration Region: Gulf of California Rift Zone GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed.

235

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

June 27, 2012 June 27, 2012 CX-008614: Categorical Exclusion Determination Repair Culvert on Road 3 CX(s) Applied: B1.3 Date: 06/27/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office June 27, 2012 CX-008613: Categorical Exclusion Determination Replace Awning, Building 735-A CX(s) Applied: B1.3 Date: 06/27/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office June 26, 2012 CX-008618: Categorical Exclusion Determination Evaluation of Sorbent/Ion Exchangers for Radiochemical and Metal Separations CX(s) Applied: B3.6 Date: 06/26/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office June 26, 2012 CX-008617: Categorical Exclusion Determination Savannah River National Laboratory Building 735-13A Power Addition CX(s) Applied: B1.15

236

Linda Lee | Savannah River Ecology Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Lee Faculty & Scientists SREL Home Linda Lee Savannah River Ecology Laboratory P O Drawer E, Aiken, SC 29802 (803) 725-5883 office (803) 725-3309 fax lee(at)srel.uga.edu I have a...

237

Peter Stangel | Savannah River Ecology Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Stangel Senior Vice President, U.S. Endowment for Forestry and Communities co Savannah River Ecology Laboratory P O Drawer E, Aiken, SC 29802 (404)-915-2763 (803) 725-8158...

238

Farmington River Power Company | Open Energy Information  

Open Energy Info (EERE)

Company Jump to: navigation, search Name: Farmington River Power Company Place: Connecticut References: EIA Form EIA-861 Final Data File for 2010 - File1a1 EIA Form 861 Data...

239

Raft River geoscience case study: appendixes  

SciTech Connect (OSTI)

The following are included in these appendices: lithology, x-ray analysis, and cores; well construction data; borehole geophysical logs; chemical analyses from wells at the Raft River geothermal site; and bibliography. (MHR)

Dolenc, M.R.; Hull, L.C.; Mizell, S.A.; Russell, B.F.; Skiba, P.A.; Strawn, J.A.; Tullis, J.A.

1981-11-01T23:59:59.000Z

240

James Beasley | Savannah River Ecology Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Beasley Curriculum Vitae Faculty & Scientists SREL Home James Beasley Savannah River Ecology Laboratory P O Drawer E, Aiken, SC 29802 (803) 725-5113 office (803) 725-3309 fax...

Note: This page contains sample records for the topic "river sockeye captive" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Robert A. Kennamer | Savannah River Ecology Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Kennamer Curriculum Vitae Faculty & Scientists SREL Home Robert A. Kennamer Savannah River Ecology Laboratory P O Drawer E, Aiken, SC 29802 (803) 725-0387 office (803) 725-3309 fax...

242

Gary Mills | Savannah River Ecology Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Mills Curriculum Vitae Faculty & Scientists SREL Home Gary Mills Savannah River Ecology Laboratory P O Drawer E, Aiken, SC 29802 (803) 725-5368 office (803) 725-3309 fax...

243

Judith L. Greene | Savannah River Ecology Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Greene Curriculum Vitae Faculty & Scientists SREL Home SREL Herpetology Judith L. Greene Savannah River Ecology Laboratory P O Drawer E, Aiken, SC 29802 (803) 725-7637 office (803)...

244

Thomas G. Hinton | Savannah River Ecology Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Hinton Curriculum Vitae Faculty & Scientists SREL Home Thomas G. Hinton Savannah River Ecology Laboratory P O Drawer E, Aiken, SC 29802 (803) 725-7454 office (803) 725-3309 fax...

245

David E. Scott | Savannah River Ecology Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Scott Curriculum Vitae Faculty & Scientists SREL Home David E. Scott Savannah River Ecology Laboratory P O Drawer E, Aiken, SC 29802 (803) 725-5747 office (803) 725-3309 fax...

246

Larry Bryan | Savannah River Ecology Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Bryan Curriculum Vitae Faculty & Scientists SREL Home Larry Bryan Savannah River Ecology Laboratory P O Drawer E, Aiken, SC 29802 (803) 725-2907 office (803) 725-3309 fax...

247

John Seaman | Savannah River Ecology Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Seaman Curriculum Vitae Faculty & Scientists SREL Home John Seaman Savannah River Ecology Laboratory P O Drawer E, Aiken, SC 29802 (803) 725-0977 office (803) 725-3309 fax...

248

Domy C. Adriano | Savannah River Ecology Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Adriano Curriculum Vitae Faculty & Scientists SREL Home Domy C. Adriano Savannah River Ecology Laboratory P O Drawer E, Aiken, SC 29802 (803) 725-5834 office (803) 725-3309 fax...

249

Shem D. Unger | Savannah River Ecology Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Unger Curriculum Vitae Faculty & Scientists SREL Home Shem D. Unger Savannah River Ecology Laboratory P O Drawer E, Aiken, SC 29802 (803) 725-5324 office (765) 414-5435 cell...

250

Savannah River Site Environmental Report for 1997  

SciTech Connect (OSTI)

The mission at the Savannah River Site has changed from the production of nuclear weapons materials for national defense to the management of waste, restoration of the environment, and the development of industry in and around the site.

Arnett, M.W.; Mamatey, A.R. [eds.

1998-08-01T23:59:59.000Z

251

Savannah River Site Achieves Waste Transfer First  

Broader source: Energy.gov [DOE]

AIKEN, S.C. The EM program and its liquid waste contractor at the Savannah River Site (SRS) made history recently by safely transferring radioactive liquid waste from F Tank Farm to H Tank Farm using a central control room.

252

Contractor Fee Payments- Office of River Protection  

Broader source: Energy.gov [DOE]

See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Office of River Protection on these charts.

253

Project Management Institute Highlights Savannah River Nuclear...  

Office of Environmental Management (EM)

Site's H Canyon Work Ensures Future Missions for Facility Restoration of a 90-acre powerhouse ash basin at the Savannah River Site, pictured here, is under way as workers remove...

254

Contractor Fee Payments- Savannah River Site Office  

Broader source: Energy.gov [DOE]

See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Savannah River Site Office on these charts.

255

Savannah River Site 1991 Road Erosion Inventory.  

SciTech Connect (OSTI)

Final Report. USDA Forest Service, Savannah River, Aiken, SC. 28 pp. Abstract - This paper explains the rationale and results of a 1991 road erosion inventory conducted by members of the USDA Forest Service Savannah River (FS-SR) and USDA Natural Resources Conservation Service (NRCS). The inventory provided information for the Department of Energy - Savannah River (DOE-SR) to justify the need for developing an erosion and sediment control program with appropriate funding, personnel, and equipment. Federally managed since the early 1950s, the SRS is located on 198,344 acres (80,301 hectares) in the South Carolina counties of Aiken, Barnwell, and Allendale. Located along the eastern border of the Savannah River, the SRS is located within the Upper and Lower Coastal Plains of South Carolina.

Jones, Cliff.

2007-06-22T23:59:59.000Z

256

Lumbee River EMC- Residential Weatherization Loan Program  

Broader source: Energy.gov [DOE]

Lumbee River Electric Membership Corporation (LREMC) offers low interest loans to help its residential members increase the energy efficiency of their homes. Loans up to $10,000 are available for...

257

Think water : reconditioning the Malden River  

E-Print Network [OSTI]

The purpose of this thesis is to link water, history and culture through architectural and urban design by researching the potential for the rejuvenation of a neglected industrial site at the edge of a river. The Malden ...

Oda, Kazuyo, 1969-

2003-01-01T23:59:59.000Z

258

Upcoming Seminars | Savannah River Ecology Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Upcoming Seminars Seminars will be held at the Savannah River Ecology Laboratory, Bldg. 737-A, in the Cypress Room, at 3:30 PM. Snacks will be provided at 3:15. DATE SPEAKER TITLE...

259

Sky River Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Sky River Wind Farm Sky River Wind Farm Jump to: navigation, search Name Sky River Wind Farm Facility Sky River Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner NextEra Energy Resources Developer Zond Systems Energy Purchaser Southern California Edison Co Location Tehachapi CA Coordinates 35.07665°, -118.25529° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.07665,"lon":-118.25529,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

260

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

February 24, 2011 February 24, 2011 CX-005504: Categorical Exclusion Determination Analytical Methods for Radiochemical Measurements CX(s) Applied: B3.6 Date: 02/24/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office February 24, 2011 CX-005503: Categorical Exclusion Determination Drain Line Replacement West of 735-A CX(s) Applied: B1.3 Date: 02/24/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office February 24, 2011 CX-005502: Categorical Exclusion Determination Implement Savannah River National Laboratory Defense Nuclear Facilities Safety Board 2004-2 Gap Closure Activity CX(s) Applied: B2.3 Date: 02/24/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office

Note: This page contains sample records for the topic "river sockeye captive" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Lower Columbia River Estuary Partnership. The  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

located just downstream of Longview, Wash. Vegetation is typical for disturbed tidal wetlands along the Columbia River; on-site vegetation is a mix of native and non-native...

262

RIVER PROTECTION PROJECT SYSTEM PLAN  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and disposal at the Waste Isolation Pilot Plant (WIPP) in New Mexico. (6) Deploying interim storage capacity for the immobilized high-level waste (IHLW) pending determination of the final disposal pathway. (7) Closing the SST and DST tank farms, ancillary facilities, and all associated waste management and treatment facilities. (8) Optimizing the overall mission by resolution of technical and programmatic uncertainties, configuring the tank farms to provide a steady, well-balanced feed to the WTP, and performing trade-offs of the required amount and type of supplemental treatment and of the amount of HLW glass versus LAW glass. ORP has made and continues to make modifications to the WTP contract as needed to improve projected plant performance and address known or emerging risks. Key elements needed to implement the strategy described above are included within the scope of the Tank Operations Contract (TOC). Interim stabilization of the SSTs was completed in March 2004. As of April 2009, retrieval of seven SSTs has been completed and retrieval of four additional SSTs has been completed to the limits of technology. Demonstration of supplemental LAW treatment technologies has stopped temporarily pending revision of mission need requirements. Award of a new contract for tank operations (TOC), the ongoing tank waste retrieval experience, HLW disposal issues, and uncertainties in waste feed delivery and waste treatment led to the revision of the Performance Measurement Baseline (PM B), which is currently under review prior to approval. 6 This System Plan is aligned with the current WTP schedule, with hot commissioning beginning in 2018, and full operations beginning in late 2019. Major decisions regarding the use of supplemental treatment and the associated technology, the ultimate needed capacity, and its relationship to the WTP have not yet been finalized. This System Plan assumes that the outcome of these decisions will be to provide a second LAW vitrification facility. No final implementation decisions regarding supplemental technology can be made until the Tank Closure and

CERTA PJ; KIRKBRIDE RA; HOHL TM; EMPEY PA; WELLS MN

2009-09-15T23:59:59.000Z

263

RIVER PROTECTION PROJECT SYSTEM PLAN  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, the ORP is responsible for the retrieval, treatment, and disposal of the approximately 57 million gallons of radioactive waste contained in the Hanford Site waste tanks and closure of all the tanks and associated facilities. The previous revision of the System Plan was issued in September 2003. ORP has approved a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. The ORP has established contracts to implement this strategy to establish a basic capability to complete the overall mission. The current strategy for completion of the mission uses a number of interrelated activities. The ORP will reduce risk to the environment posed by tank wastes by: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) for treatment and disposal; (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) and about half of the low-activity waste (LAW) contained in the tank farms, and maximizing its capability and capacity; (3) Developing and deploying supplemental treatment capability or a second WTP LAW Facility that can safely treat about half of the LAW contained in the tank farms; (4) Developing and deploying treatment and packaging capability for transuranic (TRU) tank waste for shipment to and disposal at the Waste Isolation Pilot Plant (WIPP); (5) Deploying interim storage capacity for the immobilized HLW and shipping that waste to Yucca Mountain for disposal; (6) Operating the Integrated Disposal Facility for the disposal of immobilized LAW, along with the associated secondary waste, (7) Closing the SST and DST tank farms, ancillary facilities, and al1 waste management and treatment facilities, (8) Developing and implementing technical solutions to mitigate the impact from substantial1y increased estimates of Na added during the pretreatment of the tank waste solids, This involves a combination of: (1) refining or modifying the flowsheet to reduce the required amount of additional sodium, (2) increasing the overall LAW vitrification capacity, (3) increasing the incorporation of sodium into the LAW glass, or (4) accepting an increase in mission duration, ORP has made and continues to make modifications to the WTP contract as needed to improve projected plant performance and address known or emerging risks, Key elements of the implementation of this strategy are included within the scope of the Tank Operations Contract, currently in procurement Since 2003, the ORP has conducted over 30 design oversight assessments of the Waste Treatment and Immobilization Plant (WTP). The estimated cost at completion has increased and the schedule for construction and commissioning of the WTP has extended, The DOE, Office of Environmental Management (EM), sanctioned a comprehensive review of the WTP flowsheet, focusing on throughput. In 2005, the TFC completed interim stabilization of the SSTs and as of March 2007, has completed the retrieval of seven selected SSTs. Demonstration of supplemental treatment technologies continues. The ongoing tank waste retrieval experience, progress with supplemental treatment technologies, and changes in WTP schedule led to the FY 2007 TFC baseline submittal in November 2006. The TFC baseline submittal was developed before the WTP schedule was fully understood and approved by ORP, and therefore reflects an earlier start date for the WTP facilities. This System Plan is aligned with the current WTP schedule with hot commissioning beginning in 2018 and full operations beginning in 2019. Major decisions regarding the use of supplemental treatment and the associated technology, the ultimate needed capacity, and its relationship to the WTP have not yet been finalized. This System Plan assumes that the outcome of

CERTA PJ

2008-07-10T23:59:59.000Z

264

Fact Sheets  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

habitat - July 2010 Big Island land purchase preserves McKenzie River habitat - June 2010 Bingham County land purchase is next step in recovering sockeye - June 2010 Easement would...

265

Columbia River Component Data Gap Analysis  

SciTech Connect (OSTI)

This Data Gap Analysis report documents the results of a study conducted by Washington Closure Hanford (WCH) to compile and reivew the currently available surface water and sediment data for the Columbia River near and downstream of the Hanford Site. This Data Gap Analysis study was conducted to review the adequacy of the existing surface water and sediment data set from the Columbia River, with specific reference to the use of the data in future site characterization and screening level risk assessments.

L. C. Hulstrom

2007-10-23T23:59:59.000Z

266

Linking ecosystem services, rehabilitation, and river hydrogeomorphology  

E-Print Network [OSTI]

, however, because of a developing trend in environmental sciences to emphasize the benefits and services provided by aquatic and terrestrial ecosystems (e.g., Postel and Carpenter 1997, Loomis et al. 2000, Nelson et al. 2009). This trend in- cludes... (Ricciardi and Rasmussen 1999). A focus on ecosystem ser- vices may also promote alternative river management options, including river rehabilitation. The USACEs objective in this area is related to mandates for national ecosystem restoration through...

Thorp, James H.

2010-01-01T23:59:59.000Z

267

Raft River Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Raft River Geothermal Area Raft River Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Raft River Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 DOE Involvement 4 Timeline 5 Regulatory and Environmental Issues 6 Future Plans 7 Raft River Unit II (26 MW) and Raft River Unit III (32 MW) 8 Enhanced Geothermal System Demonstration 9 Exploration History 10 Well Field Description 11 Technical Problems and Solutions 12 Geology of the Area 12.1 Regional Setting 12.2 Structure 12.3 Stratigraphy 12.3.1 Raft River Formation 12.3.2 Salt Lake Formation 12.3.3 Precambrian Rocks 13 Hydrothermal System 14 Heat Source 15 Geofluid Geochemistry 16 NEPA-Related Analyses (1) 17 Exploration Activities (77) 18 References Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":6,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"300px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.10166667,"lon":-113.38,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

268

E-Print Network 3.0 - assessment columbia river Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for: assessment columbia river Page: << < 1 2 3 4 5 > >> 1 352000 Columbia river Basin Fish and Wildlife Program "...the Council is adopting Summary: 352000 Columbia river Basin...

269

Indian River Hydroelectric Project Grant  

SciTech Connect (OSTI)

This Final Technical Report provides a concise retrospective and summary of all facets of the Sheldon Jackson College electrical Infrastructure Renovation portion of the Indian River Hydroelectric Project Grant of the City and Borough of Sitka, Alaska. The Project Overview describes the origins of the project, the original conditions that provided the impetus for the grant funding, how the grant amendment was developed, the conceptual design development, and the actual parameters of the final project as it went out to bid. The Project Overview also describes the ''before and after'' conditions of the project. The Objectives division of this Final Technical Report describes the amendment-funded goals of the project. It also describes the milestones of project development and implementation, as well as, the rationale behind the milestone array. The Description of Activities Performed division of this report provides an in-depth chronological analysis of progressive project implementation. Photographs will provide further illustration of particular functional aspects of the renovation project within project parameters. The Conclusions and Recommendations division of this report provides a comprehensive retrospective analysis of the project.

Rebecca Garrett

2005-04-29T23:59:59.000Z

270

Columbia River Plume andColumbia River Plume and California Current Ecosystem:California Current Ecosystem  

E-Print Network [OSTI]

­ Understand processes and develop tools (models and ocean indices) for forecasting salmonid survival and returns #12;EggEgg--smolt Potentialsmolt Potential-- Snake RiverSnake River Spring ChinookSpring Chinook 0 Recent `good' ocean 100 yr ave ocean `Poor' ocean #12;CHART OF SEA SURFACE TEMPERATURE · Note: warm water

271

Independent Oversight Follow-up Review, Savannah River National Laboratory  

Broader source: Energy.gov (indexed) [DOE]

Savannah River National Savannah River National Laboratory - January 2012 Independent Oversight Follow-up Review, Savannah River National Laboratory - January 2012 January 2012 Follow-up Review of Implementation Verification Reviews at the Savannah River National Laboratory Savannah River Site The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent review of the identification and implementation of safety basis hazard controls associated with "flashing spray release" and supporting information documented in the Savannah River National Laboratory (SRNL) WSRC-SA-2, SRNL Technical Area Documented Safety Analysis, Revision 10; WSRC-TS-97-00014, SRNL Technical Area Technical Safety Requirements,

272

Singing River Electric Power Association - Comfort Advantage Home Program |  

Broader source: Energy.gov (indexed) [DOE]

Singing River Electric Power Association - Comfort Advantage Home Singing River Electric Power Association - Comfort Advantage Home Program Singing River Electric Power Association - Comfort Advantage Home Program < Back Eligibility Residential Savings Category Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Heat Pumps Program Info State Mississippi Program Type Utility Rebate Program Rebate Amount Contact Singing River Electric Power Association Provider Singing River Electric Power Association Singing River Electric Power Association provides rebates on energy efficiency measures in new homes and heat pumps that meet [http://www.comfortadvantage.com/Comfort%20Advantage%20brochure.pdf Comfort Advantage] weatherization standards. To qualify for this rebate the home

273

Great River Energy (28 Member Cooperatives) - Commercial and Industrial  

Broader source: Energy.gov (indexed) [DOE]

Great River Energy (28 Member Cooperatives) - Commercial and Great River Energy (28 Member Cooperatives) - Commercial and Industrial Efficiency Rebates Great River Energy (28 Member Cooperatives) - Commercial and Industrial Efficiency Rebates < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Tribal Government Savings Category Heating & Cooling Commercial Heating & Cooling Heating Cooling Appliances & Electronics Heat Pumps Commercial Lighting Lighting Manufacturing Water Heating Program Info Funding Source Great River Energy State Minnesota Program Type Utility Rebate Program Rebate Amount Varies by measure and member cooperative offering. Provider Great River Energy Great River Energy, a generation and transmission cooperative which serves

274

Interstate Commission on the Potomac River Basin (Multiple States) |  

Broader source: Energy.gov (indexed) [DOE]

Interstate Commission on the Potomac River Basin (Multiple States) Interstate Commission on the Potomac River Basin (Multiple States) Interstate Commission on the Potomac River Basin (Multiple States) < Back Eligibility Commercial Construction Industrial Investor-Owned Utility Local Government Municipal/Public Utility Rural Electric Cooperative Systems Integrator Tribal Government Utility Savings Category Water Buying & Making Electricity Home Weatherization Program Info State District of Columbia Program Type Environmental Regulations Siting and Permitting Provider Interstate Commission on the Potomac River Basin The Interstate Commission on the Potomac River Basin's (ICPRB) mission is to enhance, protect, and conserve the water and associated land resources of the Potomac River and its tributaries through regional and interstate

275

River Hydrokinetic Resource Atlas | Open Energy Information  

Open Energy Info (EERE)

River Hydrokinetic Resource Atlas River Hydrokinetic Resource Atlas Jump to: navigation, search Tool Summary LAUNCH TOOL Name: River Hydrokinetic Resource Atlas Agency/Company /Organization: National Renewable Energy Laboratory Sector: Energy Focus Area: Water Power Resource Type: Maps, Software/modeling tools User Interface: Website Website: maps.nrel.gov/river_atlas Country: United States Web Application Link: maps.nrel.gov/river_atlas Cost: Free UN Region: Northern America Coordinates: 39.7412019515°, -105.172290802° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.7412019515,"lon":-105.172290802,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

276

New River Geothermal Exploration (Ram Power Inc.)  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

The New River Geothermal Exploration (DOE Award No. EE0002843) is located approximately 25km south of the Salton Sea, near town of Brawley in Imperial County and approximately 150km east of San Diego, California. A total of 182 MT Logger sites were completed covering the two separate Mesquite and New River grids. The data was collected over a frequency range of 320Hz to 0.001Hz with variable site spacing. A number of different inversion algorithms in 1D, 2D and 3D were used to produce resistivity-depth profiles and maps of subsurface resistivity variations over the survey area. For 2D inversions, a total of eighteen lines were constructed in east-west and north-south orientations crossing the entire survey area. For MT 3D inversion, the New River property was divided in two sub-grids, Mesquite and New River areas. The report comprises of two parts. For the first part, inversions and geophysical interpretation results are presented with some recommendations of the potential targets for future follow up on the property. The second part of the report describes logistics of the survey, survey parameters, methodology and the survey results (data) in digital documents. The report reviews a Spartan MT survey carried out by Quantec Geoscience Limited over the New River Project in California, USA on behalf of Ram Power Inc. Data was acquired over a period of 29 days from 2010/06/26 to 2010/07/24.

Clay Miller

277

Savannah River Site (SRS) environmental overview  

SciTech Connect (OSTI)

The environmental surveillance activities at and in the vicinity of the Savannah River Site (SRS) (formerly the Savannah River Plant (SRP)) comprise one of the most comprehensive and extensive environmental monitoring programs in the United States. This overview contains monitoring data from routine and nonroutine radiological and nonradiological environmental surveillance activities, summaries of environmental protection programs in progress, a summary of National Environmental Policy Act (NEPA) activities, and a listing of environmental permits (Appendix A) issued by regulatory agencies. This overview provides information about the impact of SRS operations on the public and the environment. The SRS occupies a large area of approximately 300 square miles along the Savannah River, principally in Aiken and Barnwell counties of South Carolina. SRS's primary function is the production of tritium, plutonium, and other special nuclear materials for national defense, for other governmental uses, and for some civilian purposes. From August 1950 to March 31, 1989, SRS was operated for the Department of Energy (DOE) by E. I. du Pont de Nemours Co. On April 1, 1989 the Westinghouse Savannah River Company assumed responsibility as the prime contractor for the Savannah River Site.

O'Rear, M.G. (USDOE Savannah River Operations Office, Aiken, SC (USA)); Steele, J.L.; Kitchen, B.G. (Westinghouse Savannah River Co., Aiken, SC (USA)) (eds.)

1990-01-01T23:59:59.000Z

278

New River Geothermal Exploration (Ram Power Inc.)  

SciTech Connect (OSTI)

The New River Geothermal Exploration (DOE Award No. EE0002843) is located approximately 25km south of the Salton Sea, near town of Brawley in Imperial County and approximately 150km east of San Diego, California. A total of 182 MT Logger sites were completed covering the two separate Mesquite and New River grids. The data was collected over a frequency range of 320Hz to 0.001Hz with variable site spacing. A number of different inversion algorithms in 1D, 2D and 3D were used to produce resistivity-depth profiles and maps of subsurface resistivity variations over the survey area. For 2D inversions, a total of eighteen lines were constructed in east-west and north-south orientations crossing the entire survey area. For MT 3D inversion, the New River property was divided in two sub-grids, Mesquite and New River areas. The report comprises of two parts. For the first part, inversions and geophysical interpretation results are presented with some recommendations of the potential targets for future follow up on the property. The second part of the report describes logistics of the survey, survey parameters, methodology and the survey results (data) in digital documents. The report reviews a Spartan MT survey carried out by Quantec Geoscience Limited over the New River Project in California, USA on behalf of Ram Power Inc. Data was acquired over a period of 29 days from 2010/06/26 to 2010/07/24.

Clay Miller

2013-11-15T23:59:59.000Z

279

Withlacoochee River Elec Coop | Open Energy Information  

Open Energy Info (EERE)

Withlacoochee River Elec Coop Withlacoochee River Elec Coop Jump to: navigation, search Name Withlacoochee River Elec Coop Place Florida Utility Id 20885 Utility Location Yes Ownership C NERC Location FRCC NERC FRCC Yes Activity Distribution Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png General Service Demand Commercial General Service Non-Demand Commercial Residential Service Residential Average Rates Residential: $0.1170/kWh Commercial: $0.0976/kWh Industrial: $0.0880/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a"

280

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

June 20, 2011 June 20, 2011 CX-006372: Categorical Exclusion Determination Well Installations at R-Area Operable Unit CX(s) Applied: B3.1 Date: 06/20/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office June 15, 2011 CX-006373: Categorical Exclusion Determination Connect 735-11A to the Central Plant Chilled Water System CX(s) Applied: B1.3 Date: 06/15/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office June 14, 2011 CX-006375: Categorical Exclusion Determination Replace Transfer Lines with Spare Lines CX(s) Applied: B1.3 Date: 06/14/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office June 14, 2011 CX-006374: Categorical Exclusion Determination

Note: This page contains sample records for the topic "river sockeye captive" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Cemex River Plant | Open Energy Information  

Open Energy Info (EERE)

Plant Plant Jump to: navigation, search Name Cemex River Plant Facility Cemex River Plant Sector Wind energy Facility Type Community Wind Facility Status In Service Owner Foundation Windpower Developer Foundation Windpower Energy Purchaser Cemex River Plant Location Victorville CA Coordinates 34.55527517°, -117.3012614° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":34.55527517,"lon":-117.3012614,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

282

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

November 29, 2012 November 29, 2012 CX-009607: Categorical Exclusion Determination 772-F Low-Activity Drain (LAD) Discharge Header Modification CX(s) Applied: B1.3 Date: 11/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office November 29, 2012 CX-008651: Categorical Exclusion Determination Dismantle and Remove (D&R) and Replace 773-A D-Wing Air Handling and Condensing Units CX(s) Applied: B1.3 Date: 05/17/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office November 29, 2012 CX-009608: Categorical Exclusion Determination Refurbish 607-53C Sanitary Sewer Lift Station CX(s) Applied: B1.3 Date: 11/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office November 27, 2012 CX-009611: Categorical Exclusion Determination

283

Savannah River Site | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Savannah River Site Savannah River Site Savannah River Site Work is under way to decommission the Heavy Water Components Test Reactor, which had been used to test experimental fuel assemblies for commercial heavy-water power reactors. SRS is scheduled to remove the dome of the reactor this month (January 2011). Workers also will displace the reactor vessel and steam generators, grout the remaining structure in place, and install a concrete cover over the reactor's footprint Work is under way to decommission the Heavy Water Components Test Reactor, which had been used to test experimental fuel assemblies for commercial heavy-water power reactors. SRS is scheduled to remove the dome of the reactor this month (January 2011). Workers also will displace the reactor vessel and steam generators, grout the remaining structure in place, and

284

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

June 23, 2009 June 23, 2009 CX-000497: Categorical Exclusion Determination F-Canyon Complex Deactivation CX(s) Applied: B1.28 Date: 06/23/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office June 15, 2009 CX-000495: Categorical Exclusion Determination M-Area Chemical Oxidation (MACO) - Installation of Southern Sector Coreholes and Monitoring Wells Date: 06/15/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office June 15, 2009 CX-000496: Categorical Exclusion Determination F Area Hazardous Waste Management Facility Silver Chloride Solution Injection Wells CX(s) Applied: B6.2 Date: 06/15/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office

285

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

July 31, 2013 July 31, 2013 CX-010844: Categorical Exclusion Determination Subcontractor Repair of Leak Over Entry Door #1 at 703-B CX(s) Applied: B1.3 Date: 07/31/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office July 30, 2013 CX-010846: Categorical Exclusion Determination Install Stud, Shims, and Nut in the L-Basin 70-Ton Cask Lid Support Structure CX(s) Applied: B2.5 Date: 07/30/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office July 23, 2013 CX-010850: Categorical Exclusion Determination Install Well Pump into the F-Tank Farm Catch Tank FL-241901-WTS-TK-1 CX(s) Applied: B1.3 Date: 07/23/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office July 23, 2013 CX-010849: Categorical Exclusion Determination

286

Carson River Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

River Geothermal Area River Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Carson River Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (0) 10 References Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":6,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"300px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.77,"lon":-119.715,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

287

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

September 2, 2009 September 2, 2009 CX-000521: Categorical Exclusion Determination Cut and Cap #325 Steam Supply Header, 261-H Consolidated Incineration Facility CX(s) Applied: B1.27 Date: 09/02/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office September 2, 2009 CX-000520: Categorical Exclusion Determination 690-N (Ford Building) Fire System Isolation and Sanitary Sewer Grouting CX(s) Applied: B1.27 Date: 09/02/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office September 1, 2009 CX-000519: Categorical Exclusion Determination E-Area Box Remediation Project CX(s) Applied: B6.6 Date: 09/01/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office

288

Huaneng Lancang River Hydropower | Open Energy Information  

Open Energy Info (EERE)

Lancang River Hydropower Lancang River Hydropower Jump to: navigation, search Name Huaneng Lancang River Hydropower Place Kunming, Yunnan Province, China Zip 650214 Sector Hydro, Solar Product Developer of hydro and solar power projects. Coordinates 25.051001°, 102.702011° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":25.051001,"lon":102.702011,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

289

Illinois River Energy LLC | Open Energy Information  

Open Energy Info (EERE)

River Energy LLC River Energy LLC Jump to: navigation, search Name Illinois River Energy LLC Place Rochelle, Illinois Zip 61068 Product Owns and operates the Rochelle bioethanol plant producing ethanol and feedstock from grain. Coordinates 38.301544°, -78.272893° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.301544,"lon":-78.272893,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

290

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

March 15, 2013 March 15, 2013 CX-010126: Categorical Exclusion Determination Operation of Induction Furnace Fabrication Lab CX(s) Applied: B3.6 Date: 03/15/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office March 15, 2013 CX-010125: Categorical Exclusion Determination Microfluidics for Advanced Separation and Ultrasensitive Detection CX(s) Applied: B3.6 Date: 03/15/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office March 15, 2013 CX-010131: Categorical Exclusion Determination Replacement of the 254-13H Safety Significant (SS) Standby Diesel Generator CX(s) Applied: B1.25 Date: 03/15/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office March 15, 2013 CX-010130: Categorical Exclusion Determination Mechanical Isolation of Plant Air System at TNX

291

Savannah River Site | National Nuclear Security Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Site | National Nuclear Security Administration Site | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Our Locations > Savannah River Site Savannah River Site http://www.srs.gov/general/srs-home.html Field Office: Located south of Aiken, South Carolina, the Savannah River Field Office (SRFO) is responsible for the NNSA Defense Program missions at

292

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

August 13, 2013 August 13, 2013 CX-011158: Categorical Exclusion Determination Subcontractor Repair of Roof Leaks at 717-11A CX(s) Applied: B1.3 Date: 08/13/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office August 13, 2013 CX-011157: Categorical Exclusion Determination Subcontractor Roof Repairs in Telecom Room at 702-C CX(s) Applied: B1.3 Date: 08/13/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office August 8, 2013 CX-011163: Categorical Exclusion Determination Subcontractor Repair of Roof Leaks at 730-4B CX(s) Applied: B1.3 Date: 08/08/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office August 8, 2013 CX-011162: Categorical Exclusion Determination Subcontractor Repair of Roof Leaks at 730-1B CX(s) Applied: B1.3

293

Great River Energy | Open Energy Information  

Open Energy Info (EERE)

Great River Energy Great River Energy Place Minnesota Utility Id 7570 Utility Location Yes Ownership C NERC Location MRO NERC MRO Yes ISO MISO Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates No Rates Available References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=Great_River_Energy&oldid=410764"

294

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

August 9, 2010 August 9, 2010 CX-003633: Categorical Exclusion Determination Install Platform and Stairs at F-10 Outfall CX(s) Applied: B2.3 Date: 08/09/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office August 4, 2010 CX-003635: Categorical Exclusion Determination D-Area Chemical Truck Unloading Station CX(s) Applied: B2.5 Date: 08/04/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office August 4, 2010 CX-003636: Categorical Exclusion Determination 484-D Sump Discharge Line Installation CX(s) Applied: B1.3 Date: 08/04/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office July 30, 2010 CX-003640: Categorical Exclusion Determination Howard T. Ricketts Laboratory (HTRL) Lab 134 CX(s) Applied: B3.6

295

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

April 20, 2011 April 20, 2011 CX-005766: Categorical Exclusion Determination Filter Testing with Static Test Cell CX(s) Applied: B3.6 Date: 04/20/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office April 19, 2011 CX-005769: Categorical Exclusion Determination Dismantle and Removal (D&R) and Enhance Chemical Cleaning (ECC) on Waste Tank 8F (General) CX(s) Applied: B1.28 Date: 04/19/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office April 15, 2011 CX-005771: Categorical Exclusion Determination Install Alternate Diesel Generator and Tie-In Connection for HB-Line CX(s) Applied: B2.5 Date: 04/15/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office

296

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

April 16, 2013 April 16, 2013 CX-010322: Categorical Exclusion Determination Research and Development Welding and Brazing Sample Preparation and Activities in Building 723-A CX(s) Applied: B3.6 Date: 04/16/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office April 16, 2013 CX-010321: Categorical Exclusion Determination Destructive Evaluation of Plutonium Storage Can Bundles CX(s) Applied: B3.6 Date: 04/16/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office April 16, 2013 CX-010320: Categorical Exclusion Determination Corrosion Testing in Aqueous Solutions CX(s) Applied: B3.6 Date: 04/16/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office April 15, 2013 CX-010324: Categorical Exclusion Determination 772-F Chase 174 Sprinkler Modification

297

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

February 23, 2010 February 23, 2010 CX-001128: Categorical Exclusion Determination Closure of 607-10G Septic Tank (Served 661-G) CX(s) Applied: B1.27 Date: 02/23/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office February 23, 2010 CX-001127: Categorical Exclusion Determination Ballistic Resistant Enclosure Hatch Counterbalance CX(s) Applied: B2.5 Date: 02/23/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office February 23, 2010 CX-000878: Categorical Exclusion Determination 293-F Stack Risk Reduction Project CX(s) Applied: B1.28 Date: 02/23/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office February 23, 2010

298

New River Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

New River Geothermal Area New River Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: New River Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (13) 10 References Area Overview Geothermal Area Profile Location: California Exploration Region: Gulf of California Rift Zone GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed. Add a new Operating Power Plant

299

Lower Colorado River Authority | Open Energy Information  

Open Energy Info (EERE)

River Authority River Authority Jump to: navigation, search Name Lower Colorado River Authority Place Texas Utility Id 11269 Utility Location Yes Ownership S NERC Location TRE NERC ERCOT Yes ISO Ercot Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes Activity Bundled Services Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates No Rates Available References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a"

300

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

July 24, 2012 July 24, 2012 CX-009067: Categorical Exclusion Determination Deactivation and Decommissioning of the D-Area Detritiation Cells and Relocation of Associated Handi-Houses CX(s) Applied: B1.23 Date: 07/24/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office July 24, 2012 CX-009066: Categorical Exclusion Determination Characterization of Downgradient Volatile Organic Compounds Plume and Installation of Monitoring Well CX(s) Applied: B3.1 Date: 07/24/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office July 24, 2012 CX-009065: Categorical Exclusion Determination Installation of Sentinel Wells ASB011B/011C for A-2 Air Stripper Shutdown CX(s) Applied: B3.1 Date: 07/24/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office

Note: This page contains sample records for the topic "river sockeye captive" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

August 11, 2009 August 11, 2009 CX-000513: Categorical Exclusion Determination Cone Penetration Test sampling at ECODS (Early Construction and Operational Disposal Sites) B3 and B5 CX(s) Applied: B3.1 Date: 08/11/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office August 5, 2009 CX-000511: Categorical Exclusion Determination Isolation of Domestic Water Line, 782-4G CX(s) Applied: B1.3 Date: 08/05/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office August 5, 2009 CX-000512: Categorical Exclusion Determination Tree Removal and Chipping at P-Area Ash Basin and R-Area Ash Basin and P-007 Outfall Date: 08/05/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office

302

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

October 25, 2010 October 25, 2010 CX-004445: Categorical Exclusion Determination Waste Treatment Plant Secondary Waste Radioactive Fluidized Bed Steam Reforming (Module A) CX(s) Applied: B3.6 Date: 10/25/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office October 15, 2010 CX-004450: Categorical Exclusion Determination Plutonium Glass Sectioning CX(s) Applied: B3.6 Date: 10/15/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office October 15, 2010 CX-004449: Categorical Exclusion Determination Bench Scale Testing to Provide Data on Precipitation Control in the Cesium Nitric Acid Recovery Process CX(s) Applied: B3.6 Date: 10/15/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office October 15, 2010

303

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

December 10, 2010 December 10, 2010 CX-004837: Categorical Exclusion Determination Measurement of Compressive Strength CX(s) Applied: B3.6 Date: 12/10/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office December 7, 2010 CX-004826: Categorical Exclusion Determination Piezometer Well Installation for 1,4-Dioxane Monitoring CX(s) Applied: B3.1 Date: 12/07/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office December 7, 2010 CX-004824: Categorical Exclusion Determination Dismantle and Remove Tank 6 Riser 7 for Waste Determination (WD) Sampling CX(s) Applied: B1.3 Date: 12/07/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office December 7, 2010 CX-004823: Categorical Exclusion Determination Consolidation of K- and L-Area Heavy Water in C-Area

304

Mary's River Geothermal Project | Open Energy Information  

Open Energy Info (EERE)

River Geothermal Project River Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Mary's River Geothermal Project Project Location Information Coordinates 41.750555555556°, -115.30194444444° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.750555555556,"lon":-115.30194444444,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

305

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

January 24, 2011 January 24, 2011 CX-005090: Categorical Exclusion Determination Stairway to FM-1H CX(s) Applied: B2.3 Date: 01/24/2011 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office January 21, 2011 CX-005109: Categorical Exclusion Determination Y589, Mobile Digital Radiography Identification System - Station CX(s) Applied: B1.15 Date: 01/21/2011 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office January 20, 2011 CX-005108: Categorical Exclusion Determination Thin Films for Whisker Growth CX(s) Applied: B3.6 Date: 01/20/2011 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office January 19, 2011 CX-005107: Categorical Exclusion Determination Karl Fisher Titration CX(s) Applied: B3.6 Date: 01/19/2011

306

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

November 29, 2010 November 29, 2010 CX-004808: Categorical Exclusion Determination Flowsheet Evaluation for the Neutralization of High Aluminum ? Low Uranium Used Nuclear Fuel (UNF) Solution CX(s) Applied: B3.6 Date: 11/29/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office November 29, 2010 CX-004809: Categorical Exclusion Determination Reactive Gas Reprocessing of Used Nuclear Fuel Simulants CX(s) Applied: B3.6 Date: 11/29/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office November 29, 2010 CX-004806: Categorical Exclusion Determination Volume Measurement of Solids by Gas Pycnometry CX(s) Applied: B3.6 Date: 11/29/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office November 12, 2010 CX-004805: Categorical Exclusion Determination

307

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

December 11, 2009 December 11, 2009 CX-000815: Categorical Exclusion Determination Hydrogen Technology Laboratory 140 - Chromatography, Wet Laboratory CX(s) Applied: B3.6 Date: 12/11/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office December 8, 2009 CX-000819: Categorical Exclusion Determination Thin-Film Development Laboratory CX(s) Applied: B3.6 Date: 12/08/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office December 8, 2009 CX-000820: Categorical Exclusion Determination Vacuum Induction Melting of Metals CX(s) Applied: B3.6 Date: 12/08/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office December 8, 2009 CX-000818: Categorical Exclusion Determination

308

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

July 20, 2012 July 20, 2012 CX-009070: Categorical Exclusion Determination A-Area Alternate Fire Water Supply CX(s) Applied: B1.3 Date: 07/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office July 20, 2012 CX-009069: Categorical Exclusion Determination Remove and Dispose of 107 A & B Tanks and Support Structure CX(s) Applied: B6.1 Date: 07/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office July 20, 2012 CX-009068: Categorical Exclusion Determination Hydrogen Charging Tritium Contaminated Metals CX(s) Applied: B3.6 Date: 07/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office July 16, 2012 CX-009077: Categorical Exclusion Determination F-Area Infrasturcture Improvement CX(s) Applied: B1.23 Date: 07/16/2012

309

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

August 30, 2012 August 30, 2012 CX-009100: Categorical Exclusion Determination Cooling Tower Water Sampling and Analysis for Legionella Pneumophila Density CX(s) Applied: B3.6 Date: 08/30/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office August 29, 2012 CX-009106: Categorical Exclusion Determination Dismantle/Remove Vacuum System and Related Equipment in 772-F CX(s) Applied: B1.3 Date: 08/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office August 29, 2012 CX-009105: Categorical Exclusion Determination 284-H Track Coal Hopper Pit Modifications CX(s) Applied: B1.28 Date: 08/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office August 29, 2012 CX-009104: Categorical Exclusion Determination Infrastructure Modification for the Mobile Plutonium Facility (MPF) at the

310

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

9, 2012 9, 2012 CX-008639: Categorical Exclusion Determination Establish Laydown Yard East of 281-3F CX(s) Applied: B1.15 Date: 05/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office May 29, 2012 CX-008638: Categorical Exclusion Determination Excavate to Repair Underground Domestic Water Leak between Tanks 5 and 7 CX(s) Applied: B1.3 Date: 05/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office May 29, 2012 CX-008637: Categorical Exclusion Determination Operation and Maintenance of Inductively Coupled Plasma Mass Spectrometry Method in 773, B142 CX(s) Applied: B3.6 Date: 05/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office May 29, 2012 CX-008636: Categorical Exclusion Determination Analysis of Organic Species by Gas Chromatography (GC) and Gas

311

Raft River Geothermal Facility | Open Energy Information  

Open Energy Info (EERE)

GEOTHERMAL ENERGYGeothermal Home GEOTHERMAL ENERGYGeothermal Home Raft River Geothermal Facility General Information Name Raft River Geothermal Facility Facility Raft River Sector Geothermal energy Location Information Location Cassia County, Idaho Coordinates 42.358036°, -113.5728501° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.358036,"lon":-113.5728501,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

312

Office of River Protection (Hanford) - Enforcement Documents  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Enforcement Documents Enforcement Documents Office of River Protection (Hanford) Enforcement Letter issued to Washington River Protection Solutions, LLC, related to a positive Unreviewed Safety Question involving the Tank Farm Waste Transfer System at the Hanford Site, (NEL-2012-01) February 28, 2012 Consent Order issued to Washington River Protection Solutions, LLC related to deficiencies in the corrective action management program, radiation control program, and sealed radioactive source accountability and control program (NCO-2011-01) May 27, 2011 Consent Order issued to Bechtel National, Inc. for Deficiencies in Vendor Commercial Grade Dedication Processes at the Hanford Waste Treatment and Immobilization Plant Project (NCO-2010-03) September 22, 2010 Preliminary Notice of Violation issued to Bechtel National, Inc., related to Deficiencies at the Waste Treatment and Immobilization Plant at the Hanford Site, December 3, 2008 (NEA-2008-04)

313

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

June 20, 2013 June 20, 2013 CX-010655: Categorical Exclusion Determination Roof Repair on Crane Maintenance Area Roof CX(s) Applied: B1.3 Date: 06/20/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office June 18, 2013 CX-010657: Categorical Exclusion Determination Western Sector Treatment System Soil Vapor Extraction Wells CX(s) Applied: B3.1 Date: 06/18/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office June 18, 2013 CX-010656: Categorical Exclusion Determination Stormwater Drainage Repair CX(s) Applied: B1.3 Date: 06/18/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office June 17, 2013 CX-010662: Categorical Exclusion Determination Reroute Diesel Water Cooling Line at 241-125H CX(s) Applied: B1.3 Date: 06/17/2013

314

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

May 21, 2013 May 21, 2013 CX-010489: Categorical Exclusion Determination Salt Batch 7 Qualification CX(s) Applied: B3.6 Date: 05/21/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office May 14, 2013 CX-010497: Categorical Exclusion Determination Electrical Operations to Perform Yard Maintenance in Electrical Substations CX(s) Applied: B1.3 Date: 05/14/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office May 14, 2013 CX-010496: Categorical Exclusion Determination Corrosion Tests on Carbon Steel Exposed to Oxalic Acid and a Sludge Simulant CX(s) Applied: B3.6 Date: 05/14/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office May 14, 2013 CX-010495: Categorical Exclusion Determination Advanced Fuel Cycle Initiative (AFCI) Am/Cm Separations

315

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

March 10, 2010 March 10, 2010 CX-001373: Categorical Exclusion Determination Analytical Development Tritium Support Laboratory for Mass Spectroscopy, Infrared Spectroscopy, and Raman CX(s) Applied: B3.6 Date: 03/10/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office March 10, 2010 CX-001372: Categorical Exclusion Determination On-Dock Rail Straddle Portal Prototype Project, Y580 CX(s) Applied: B3.6 Date: 03/10/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office March 4, 2010 CX-001129: Categorical Exclusion Determination Cut and Cap Firewater Line Tap-Off Near 714-7N CX(s) Applied: B1.3 Date: 03/04/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office

316

Arkansas River Power Authority | Open Energy Information  

Open Energy Info (EERE)

River Power Authority River Power Authority Jump to: navigation, search Name Arkansas River Power Authority Place Colorado Website www.arpapower.org/ Utility Id 712 Utility Location Yes Ownership P NERC Location WECC NERC WECC Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes Activity Wholesale Marketing Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates No Rates Available References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a"

317

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

July 20, 2011 July 20, 2011 CX-006620: Categorical Exclusion Determination Relocate Hydroburst System from 238-H to 234-7H CX(s) Applied: B1.31 Date: 07/20/2011 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office July 18, 2011 CX-006619: Categorical Exclusion Determination Install Seventeen Monitoring Wells Around 715-D CX(s) Applied: B3.1 Date: 07/18/2011 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office July 18, 2011 CX-006618: Categorical Exclusion Determination Disable F-Tank Farm (FTF) Air Compressor Sequencer CX(s) Applied: B1.3 Date: 07/18/2011 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office July 18, 2011 CX-006617: Categorical Exclusion Determination E Area Fire Water Extension CX(s) Applied: B1.15

318

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

January 17, 2012 January 17, 2012 CX-007642: Categorical Exclusion Determination Parking Lot Construction North of Pad 717-14F CX(s) Applied: B1.15 Date: 01/17/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office January 4, 2012 CX-007646: Categorical Exclusion Determination Insulation removal work in F-Tank Farm CX(s) Applied: B1.3 Date: 01/04/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office January 4, 2012 CX-007645: Categorical Exclusion Determination Nonproliferation Technology Section - Nanomaterials Research CX(s) Applied: B3.6 Date: 01/04/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office December 29, 2011 CX-007650: Categorical Exclusion Determination Control Room Consolidation CX(s) Applied: B2.2

319

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

April 16, 2010 April 16, 2010 CX-002207: Categorical Exclusion Determination Thin Films for Whisker Growth CX(s) Applied: B3.6 Date: 04/16/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office April 16, 2010 CX-002206: Categorical Exclusion Determination Real-Waste Testing of Enhanced Chemical Cleaning for Sludge Heel Removal CX(s) Applied: B3.6 Date: 04/16/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office April 16, 2010 CX-002208: Categorical Exclusion Determination Monitor Instruments Mass Spectrometer at Aiken County Technology Laboratory CX(s) Applied: B3.6 Date: 04/16/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office

320

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

November 1, 2012 November 1, 2012 CX-009620: Categorical Exclusion Determination Next Generation Solvent (NGS) Real Waste Testing CX(s) Applied: B3.6 Date: 11/01/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office October 31, 2012 CX-009624: Categorical Exclusion Determination High Activity Waste Trailer (HAWT) Disposition CX(s) Applied: B3.1 Date: 10/31/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office October 31, 2012 CX-009623: Categorical Exclusion Determination Technetium Precipitation Batch Testing CX(s) Applied: B3.6 Date: 10/31/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office October 25, 2012 CX-009625: Categorical Exclusion Determination Preparation and Temperature-Time Settling Treatment of Rheology Samples

Note: This page contains sample records for the topic "river sockeye captive" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Savannah River Site | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Site | National Nuclear Security Administration Site | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Our Locations > Savannah River Site Savannah River Site http://www.srs.gov/general/srs-home.html Field Office: Located south of Aiken, South Carolina, the Savannah River Field Office (SRFO) is responsible for the NNSA Defense Program missions at

322

Red River Biodiesel Ltd | Open Energy Information  

Open Energy Info (EERE)

River Biodiesel, Ltd. River Biodiesel, Ltd. Place Houston, Texas Zip 77006 Product Red River operates a biodiesel plant in Houstion, Texas with a capacity of 56.85mLpa (15m gallons per year). Coordinates 29.76045°, -95.369784° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":29.76045,"lon":-95.369784,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

323

Savannah River Site Waste Disposition Project  

Broader source: Energy.gov (indexed) [DOE]

Terrel J. Spears Terrel J. Spears Assistant Manager Waste Disposition Project DOE Savannah River Operations Office Savannah River Site Savannah River Site Waste Disposition Project Waste Disposition Project 2 Waste Disposition Project - Mission Radioactive Liquid Waste - Tank Waste Stabilization and Disposition - Disposition 36 million gallons of radioactive liquid waste - Close 49 underground storage tanks in which the waste now resides 3 36.7 Million 33.7 Mgal (92%) 3.0 Mgal (8%) Saltcake Sludge Salt Supernate Volume Curies 397 Million Curies (MCi) 212 MCi (54%) 185 MCi (46%) Gallons (Mgal) 36.5 Million 33.5 Mgal (92%) 3.0 Mgal (8%) Liquid Waste Background Liquid Waste Background * 2 tanks closed * 49 tanks remaining to close - aging, carbon steel - 27 compliant, 22 non-compliant - 12 have known leak sites

324

Snake and Columbia Rivers Sediment Sampling Project  

SciTech Connect (OSTI)

The disposal of dredged material in water is defined as a discharge under Section 404 of the Clean Water Act and must be evaluated in accordance with US Environmental Protection Agency regulation 40 CFR 230. Because contaminant loads in the dredged sediment or resuspended sediment may affect water quality or contaminant loading, the US Army Corps of Engineers (USACE), Walla Walla District, has requested Battelle/Marine Sciences Laboratory to collect and chemically analyze sediment samples from areas that may be dredged near the Port Authority piers on the Snake and Columbia rivers. Sediment samples were also collected at River Mile (RM) stations along the Snake River that may undergo resuspension of sediment as a result of the drawdown. Chemical analysis included grain size, total organic carbon, total volatile solids, ammonia, phosphorus, sulfides, oil and grease, total petroleum hydrocarbons, metals, polynuclear aromatic hydrocarbons, pesticides, polychlorinated biphenyls, and 21 congeners of polychlorinated dibenzodioxins and dibenzofurans.

Pinza, M.R.; Word, J.Q; Barrows, E.S.; Mayhew, H.L.; Clark, D.R. (Battelle/Marine Sciences Lab., Sequim, WA (United States))

1992-12-01T23:59:59.000Z

325

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

February 7, 2012 February 7, 2012 CX-007967: Categorical Exclusion Determination Electrochemical Fluorination in Molten Fluoride Salts CX(s) Applied: B3.6 Date: 02/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office February 7, 2012 CX-007966: Categorical Exclusion Determination Sampling of Legacy Material for Material, Control & Accountability (MC&A) Verification CX(s) Applied: B3.6 Date: 02/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office February 7, 2012 CX-007965: Categorical Exclusion Determination Grout Formulation & Variability Testing CX(s) Applied: B3.6 Date: 02/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office February 6, 2012 CX-007971: Categorical Exclusion Determination

326

Milky River Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Milky River Geothermal Area Milky River Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Milky River Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (0) 10 References Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":6,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"300px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":52.32,"lon":-174.1472,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

327

Platte River Power Authority | Open Energy Information  

Open Energy Info (EERE)

River Power Authority River Power Authority Jump to: navigation, search Name Platte River Power Authority Place Colorado Website www.prpa.org/ Utility Id 15143 Utility Location Yes Ownership P NERC Location WECC NERC WECC Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Wholesale Marketing Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates No Rates Available References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a"

328

Reese River Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Reese River Geothermal Area Reese River Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Reese River Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (3) 9 Exploration Activities (10) 10 References Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":6,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"300px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.89,"lon":-117.14,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

329

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

November 7, 2011 November 7, 2011 CX-007671: Categorical Exclusion Determination Heat Exchanger Removal and Disposition CX(s) Applied: B6.1 Date: 11/07/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office November 7, 2011 CX-007670: Categorical Exclusion Determination Maintenance Excavation of the B-07 Outfall Ditch CX(s) Applied: B1.3 Date: 11/07/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office November 7, 2011 CX-007669: Categorical Exclusion Determination Vegetative Response to Metal Exposure in a Growing Media CX(s) Applied: B3.6 Date: 11/07/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office October 27, 2011 CX-007672: Categorical Exclusion Determination Sampling of Nuclear Fuel Assembly CX(s) Applied: B3.6

330

Pea River Electric Coop | Open Energy Information  

Open Energy Info (EERE)

Pea River Electric Coop Pea River Electric Coop Jump to: navigation, search Name Pea River Electric Coop Place Alabama Utility Id 14602 Utility Location Yes Ownership C NERC Location SERC Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Security Light: 100 watt high pressure sodium Lighting Security Light: 1000 watt metal halide Lighting Security Light: 250 watt high pressure sodium (flood) Lighting Security Light: 250 watt high pressure sodium (street) Lighting Security Light: 400 watt high pressure sodium Lighting Average Rates Residential: $0.1150/kWh Commercial: $0.1200/kWh

331

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

July 20, 2010 July 20, 2010 CX-003668: Categorical Exclusion Determination Subsurface Soils Exploration for Potential Pit Disassembly and Conversion Project Sandfilter Footprint CX(s) Applied: B3.1 Date: 07/20/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office July 7, 2010 CX-003670: Categorical Exclusion Determination Improvements to L Area Sidewalks CX(s) Applied: B1.3 Date: 07/07/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office July 7, 2010 CX-002984: Categorical Exclusion Determination Improvements to L Area Sidewalks CX(s) Applied: B1.3 Date: 07/07/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office June 25, 2010 CX-003671: Categorical Exclusion Determination

332

Independent Oversight Follow-up Review, Savannah River National Laboratory- January 2012  

Broader source: Energy.gov [DOE]

Follow-up Review of Implementation Verification Reviews at the Savannah River National Laboratory Savannah River Site

333

Preliminary Notice of Violation, Westinghouse Savannah River Company- EA-2000-02  

Broader source: Energy.gov [DOE]

Issued to Westinghouse Savannah River Company, related to Procurement Quality Assurance and Quality Improvement Deficiencies at the Savannah River Site.

334

Exploratory Well At Raft River Geothermal Area (1977) | Open Energy  

Open Energy Info (EERE)

7) 7) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Exploratory Well At Raft River Geothermal Area (1977) Exploration Activity Details Location Raft River Geothermal Area Exploration Technique Exploratory Well Activity Date 1977 Usefulness not indicated DOE-funding Unknown Notes Raft River Geothermal Exploratory Hole No. 4, RRGE-4 drilled. During this time Raft River geothermal exploration well sidetrack-C also completed. References Kunze, J. F.; Stoker, R. C.; Allen, C. A. (14 December 1977) Update on the Raft River Geothermal Reservoir Covington, H.R. (1 January 1978) Deep drilling data, Raft River geothermal area, Idaho-Raft River geothermal exploration well sidetrack-C Retrieved from "http://en.openei.org/w/index.php?title=Exploratory_Well_At_Raft_River_Geothermal_Area_(1977)&oldid=473847"

335

Wabash River Heritage Corridor (Indiana) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Wabash River Heritage Corridor (Indiana) Wabash River Heritage Corridor (Indiana) Wabash River Heritage Corridor (Indiana) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor Industrial Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info Start Date 1991 State Indiana Program Type Siting and Permitting Provider Wabash River Heritage Corridor Commission The Wabash River Heritage Corridor, consisting of the Wabash River, the Little River, and the portage between the Little River and the Maumee

336

Savannah River Site Achieves Transuranic Waste Disposition Goal in 2013 |  

Broader source: Energy.gov (indexed) [DOE]

Savannah River Site Achieves Transuranic Waste Disposition Goal in Savannah River Site Achieves Transuranic Waste Disposition Goal in 2013 Savannah River Site Achieves Transuranic Waste Disposition Goal in 2013 December 24, 2013 - 12:00pm Addthis Workers gather behind a “Safety and Security begins with Me” banner at the Savannah River Site. Workers gather behind a "Safety and Security begins with Me" banner at the Savannah River Site. Workers sort through transuranic waste at the Savannah River Site. Workers sort through transuranic waste at the Savannah River Site. SRR employees Glenn Kelly and Fred Merriweather pour the final amount of grout into Tank 6. SRR employees Glenn Kelly and Fred Merriweather pour the final amount of grout into Tank 6. Workers gather behind a "Safety and Security begins with Me" banner at the Savannah River Site.

337

EIS-0217: Savannah River Site Waste Management | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

17: Savannah River Site Waste Management 17: Savannah River Site Waste Management EIS-0217: Savannah River Site Waste Management Summary This EIS evaluates the potential environmental impacts and costs of storing, treating, and/or disposing of liquid high-level radioactive, low-level radioactive, hazardous, mixed (radioactive and hazardous), and transuranic wastes at SRS. Public Comment Opportunities None available at this time. Documents Available for Download June 28, 2001 EIS-0217: Amended Record of Decision Savannah River Site Waste Management, Savannah River Operations Office, Aiken, South Carolina May 19, 1997 EIS-0217: Supplemental Record of Decision Savannah River Site Waste Management May 19, 1997 EIS-0217: Supplemental Record of Decision Savannah River Site Waste Management, Savannah River Operations Office,

338

Preliminary Notice of Violation, Westinghouse Savannah River Company - EA  

Broader source: Energy.gov (indexed) [DOE]

Preliminary Notice of Violation, Westinghouse Savannah River Preliminary Notice of Violation, Westinghouse Savannah River Company - EA 98-09 Preliminary Notice of Violation, Westinghouse Savannah River Company - EA 98-09 September 21, 1998 Preliminary Notice of Violation issued to Westinghouse Savannah River Company, related to Bioassay Program Deficiencies at the Savannah River Site, (EA-98-09) This letter refers to the Department of Energy's (DOE) investigation of the facts and circumstances concerning deficiencies in Westinghouse Savannah River Company's (WSRC) bioassay participation requirements and WSRC's corrective actions to remedy those deficiencies. Preliminary Notice of Violation, Westinghouse Savannah River Company - EA 98-09 More Documents & Publications Preliminary Notice of Violation, Westinghouse Savannah River Company -

339

Independent Activity Report, Savannah River Site - March 2013 | Department  

Broader source: Energy.gov (indexed) [DOE]

Savannah River Site - March 2013 Savannah River Site - March 2013 Independent Activity Report, Savannah River Site - March 2013 March 2013 Oversight Scheduling an Operational Awareness at the Savannah River Site [HIAR-SRS-2013-03-25] Activity Description/Purpose: The Independent Oversight Site Lead for the Savannah River Site traveled to the site to work with functional area managers to schedule nuclear safety oversight activities. The Site Lead reviewed the differing professional opinion (DPO) program at the Savannah River Operations Office (Department of Energy (DOE)-SR). Independent Activity Report, Savannah River Site - March 2013 More Documents & Publications Independent Oversight Review, Savannah River Operations Office - July 2013 Policy Flash 2013-74 Quarterly Notification of the DOE's Differing

340

Marketing the Colorado River: water allocations in the American Southwest  

Science Journals Connector (OSTI)

The Colorado River is the lifeline of the American ... market in the west is one current way western states seek to reallocate water and address ... unclear what the long-term affects of marketing Colorado River ...

April R. Summitt

2011-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "river sockeye captive" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

U. S. Department of Energy Savannah River Operations Office ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Savannah River Site Liquid Waste System Plans Archive Savannah River Site Liquid Waste System Plans Archive SRR-LWP-2009-00001 R-18 (June 2013) Adobe Acrobat PDF SRR-LWP-2009-00001...

342

Daily Reporting Rainfall Station HERBERT RIVER Manual Heavy Rainfall Station  

E-Print Network [OSTI]

Daily Reporting Rainfall Station HERBERT RIVER Manual Heavy Rainfall Station Manual River Station Central Mill AL Tung Oil AL Corsis AL Innisfail Clump Point Tide TM Mourilyan Harbour TM 0 10 kilometres

Greenslade, Diana

343

Savannah River Ecology Laboratory 2005 Annual Technical Progress Report  

SciTech Connect (OSTI)

2005 annual report of research conducted by the Savannah River Ecology Laboratory, a research unit of The University of Georgia operating on the Savannah River Site, Aiken, South Carolina

Paul M. Bertsch

2005-07-19T23:59:59.000Z

344

RETURN OF THE RIVER -2000 Chapter 5 Freshwater Habitats131  

E-Print Network [OSTI]

rivers of the world and also one of the most developed with ten major hydroelectric dams on the main the major hydroelectric projects and the owner-operator of each project. #12;RETURN OF THE RIVER - 2000

345

Savannah River Ecology Laboratory FY2006 Annual Technical Progress Report  

SciTech Connect (OSTI)

FY2006 annual report of research conducted by the Savannah River Ecology Laboratory, a research unit of the University of Georgia operating on the Savannah River Site in Aiken, County, SC.

Paul M. Bertsch

2006-10-23T23:59:59.000Z

346

Type B Accident Investigation of the Savannah River Site Arc...  

Broader source: Energy.gov (indexed) [DOE]

the Savannah River Site Arc Flash Burn Injury on September 23, 2009, in the D Area Powerhouse Type B Accident Investigation of the Savannah River Site Arc Flash Burn Injury on...

347

How to Save a River: a handbook for citizen action  

E-Print Network [OSTI]

How to Save a River: a handbook for citizen action. By DavidDavid M. How to Save a River: a handbook for citizen action.to create an effective handbook for citizens interested in

Glaser, Christopher D.

1997-01-01T23:59:59.000Z

348

Fish and river pollution (J. R. Erichsen Jones)  

Science Journals Connector (OSTI)

Fish and River. Pollution. Butterworth. Inc., Washington,. D.C. viii + 203 p. $9.75. Fish und River Pollution by J. R. Erichsen Jones fills the long-felt need for a...

1999-12-28T23:59:59.000Z

349

ISE 2012, Vienna USING RIVER RESTORATION OPERATIONS TO TEST  

E-Print Network [OSTI]

and hydroelectricity since the 19th century. A restoration program of the river started officially in 1998. It has, the Rhône River has been regulated for navigation, irrigation and hydroelectricity since the 19th century

Paris-Sud XI, Université de

350

Ohio River Valley Water Sanitation Commission (Multiple States)  

Broader source: Energy.gov [DOE]

The Ohio River Valley Water Sanitation Commission (ORSANCO), was established on June 30, 1948 to control and abate pollution in the Ohio River Basin. ORSANCO is an interstate commission...

351

Deep Challenges for Foundation Performance at Savannah River Site  

Broader source: Energy.gov [DOE]

Deep Challenges for Foundation Performance at Savannah River Site Frank H. Syms and Brent Gutierrez October 22, 2014

352

Greater Platte River Basins Symposium PROGRAM Thursday, October 7  

E-Print Network [OSTI]

of the Niobrara River in the National Scenic Reach, Nebraska ­ Jason Alexander, US Geological Survey ­ Nebraska

Nebraska-Lincoln, University of

353

Terrestrial Carbon Inventory at the Savannah River Site, 1951 2001.  

SciTech Connect (OSTI)

A Power Point slide presentation/report on the terestrial carbon inventory at the Savannah River Site.

US Forest Service - Annonymous,

2012-02-01T23:59:59.000Z

354

Baseline Hydrologic Studies in the Lower Elwha River Prior to  

E-Print Network [OSTI]

After the removal of two large, longstanding dams on the Elwha River, Washington, the additional loadChapter 4 4 Chapter Baseline Hydrologic Studies in the Lower Elwha River Prior to Dam Removal characteristics of the river and estuary before dam removal, several hydrologic data sets were collected

355

SURVEY OF THE COLUMBIA RIVER AND ITS TRIBUTARIES -Part VII  

E-Print Network [OSTI]

SURVEY OF THE COLUMBIA RIVER AND ITS TRIBUTARIES - Part VII I ^^^^'fie^BkJioJS SPECIAL SCIENTIFIC, Director Special Scientific Report - Fisheries No. UO SURVEY OF THE COLUMBIA RIVER AND ITS TRIBUTARIES PART these have been divided for con- venience into four sub-areas. On the Idaho side of the Snake River

356

CREEL CENSUS AND EXPENDITURE STUDY, NORTH FORK SUN RIVER,  

E-Print Network [OSTI]

CREEL CENSUS AND EXPENDITURE STUDY, NORTH FORK SUN RIVER, MONTANA, 1951 Marine Biological STUDY, NORTH FORK SUN RIVER, MONTANA, 1951 Marine Biological Laboratory JUN16 1954 WOODS HOLE, MASS MAP CREEL CENSUS SUN RIVER MONTANA DRAWN i*^ ^ TRACED- _2£jLt:l SUBMITTED . 1 V N 01 1 VN ei

357

from Savannah River Nuclear Solutions, LLC NEWS Savannah River Tritium Enterprise Achieves High Marks for  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tritium Enterprise Achieves High Marks for Tritium Enterprise Achieves High Marks for Support to Nation's Security Fiscal Year 2012 Performance Prepares Enterprise for Continued Service AIKEN, S.C. (February 7, 2013) - The National Nuclear Security Administration (NNSA) has rated the Savannah River Tritium Enterprise's overall Fiscal Year 2012 performance as "excel- lent," meaning that the Savannah River Site's tritium-related work has once again success- fully met and exceeded NNSA's Defense Programs goals. The Savannah River Tritium Enterprise (SRTE), which is managed for NNSA by Savannah River Nuclear Solutions (SRNS), earned the rating for its successful performance of the four missions it carries out in support of the nation's security: tritium supply, nuclear stockpile maintenance,

358

EIS-0268: Shutdown of River Water System at the Savannah River Site  

Broader source: Energy.gov [DOE]

This EIS evaluates the potential environmental impacts of a proposal to shut down the Savannah R]ver Site River Water System in order to save money; that is, to prevent further expenditure of the...

359

Developing a broader scientific foundation for river restoration: Columbia River food webs  

Science Journals Connector (OSTI)

...838 . 32 Malison RL Baxter CV ( 2010 ) The fire pulse: Wildfire stimulates flux of aquatic prey to terrestrial habitats driving...2003 ) A conservation plan for native fishes of the lower Colorado River . Bioscience 53 : 219 233 . 45 Fausch KD ( 2009...

Robert J. Naiman; J. Richard Alldredge; David A. Beauchamp; Peter A. Bisson; James Congleton; Charles J. Henny; Nancy Huntly; Roland Lamberson; Colin Levings; Erik N. Merrill; William G. Pearcy; Bruce E. Rieman; Gregory T. Ruggerone; Dennis Scarnecchia; Peter E. Smouse; Chris C. Wood

2012-01-01T23:59:59.000Z

360

Reese River Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Reese River Geothermal Area Reese River Geothermal Area (Redirected from Reese River Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Reese River Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (3) 9 Exploration Activities (10) 10 References Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":6,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"300px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.89,"lon":-117.14,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "river sockeye captive" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Chlorinated organic compounds in urban river sediments  

SciTech Connect (OSTI)

Among anthropogenic chemicals, many chlorinated organic compounds have been used as insecticides and detected frequently as contaminants in urban river sediments so far. However, the number and total amount of chemicals produced commercially and used are increasing year by year, though each amount of chemicals is not so high. New types of contaminants in the environment may be detected by the use of newly developed chemicals. Chlorinated organic compounds in the urban river sediments around Tokyo and Kyoto, large cities in Japan, were surveyed and recent trends of contaminants were studied. Contaminants of the river sediments in industrial areas had a variety, but PCB (polychlorinated biphenyls) was detected in common in industrial areas. Concentration of PCB related well to the number of factories on both sides of rivers, although the use of PCB was stopped 20 years ago. In domestic areas, Triclosan (5-chloro-2-(2,4-dichlorophenoxy)-phenol) and Triclocarban (3,4,4{prime}-trichlorocarbanilide)(both are contained in soap or shampoo for fungicides), p-dichlorobenzene (insecticides for wears) and TCEP(tris-chloroethyl phosphate) were detected. EOX(extracted organic halogen) in the sediments was 5 to 10 times of chlorinated organic compounds detected by GC/MS. Major part of organic halogen was suggested to be included in chlorinated organics formed by bleaching or sterilization.

Soma, Y.; Shiraishi, H.; Inaba, K. [National Inst. of Environmental Studies, Tsukuba, Ibaraki (Japan)

1995-12-31T23:59:59.000Z

362

The Savannah River Site's groundwater monitoring program  

SciTech Connect (OSTI)

This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted by EPD/EMS in the first quarter of 1991. In includes the analytical data, field data, data review, quality control, and other documentation for this program, provides a record of the program's activities and rationale, and serves as an official document of the analytical results.

Not Available

1991-10-18T23:59:59.000Z

363

Trough to trough The Colorado River  

E-Print Network [OSTI]

Trough to trough The Colorado River and the Salton Sea Robert E. Reynolds, editor Trough to trough....................................................................................5 Robert E. Reynolds The vegetation of the Mojave and Colorado deserts geological excursions and observations of the Colorado Desert region by William Phipps Blake, 1853 and 1906

de Lijser, Peter

364

The State of the Columbia River Basin  

E-Print Network [OSTI]

: The State of the Columbia River Basin in 2012 07 Northwest Energy Efficiency Achievements, 1978-2011 10 Council undertakes mid-term review of Sixth Power Plan 11 Energy Efficiency met most of the new and Commerce United states House of representatives and Committee on Natural resources United states House

365

Land Use Baseline Report Savannah River Site  

SciTech Connect (OSTI)

This document is to serve as a resource for Savannah River Site managers, planners, and SRS stakeholders by providing a general description of the site and land-use factors important to future use decisions and plans. The intent of this document is to be comprehensive in its review of SRS and the surrounding area.

Noah, J.C.

1995-06-29T23:59:59.000Z

366

The Savannah River Site's Groundwater Monitoring Program  

SciTech Connect (OSTI)

This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted during the first quarter of 1992. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program's activities; and serves as an official document of the analytical results.

Not Available

1992-08-03T23:59:59.000Z

367

Franklin Delano Roosevelt Drive East River Esplanade  

E-Print Network [OSTI]

Bioscience Center Weiss Café Peggy Rockefeller Plaza 65th Street Gate 64th Street Gate East 63rd Street66th Street Gate and Main Entrance 67th Street Gate 68th Street Gate TennisCourt 63rd October glory red maple OP Oriental plane RB River birch RM Red maple SA Saucer magnolia SB Shadblow SC

368

The State of the Columbia River Basin  

E-Print Network [OSTI]

, and Washington. The Act authorized the Council to serve as a comprehensive planning agency for energy policy and fish and wildlife policy in the Columbia River Basin and to inform the public about energy and fish Overview 11 Sixth Northwest Power Plan boosts energy efficiency, renewable energy, Energy efficiency

369

Savannah River Laboratory monthly report, February 1992  

SciTech Connect (OSTI)

This report is a progress report for the Savannah River Laboratory for the month of February 1992. The progress and activities in six categories were described in the report. The categories are reactor, tritium, separations, environmental, waste management, and general. Each category described numerous and varied activities. Some examples of these activities described are such things as radiation monitoring, maintenance, modifications, and remedial action.

Ferrell, J.M. (comp.); Ice, L.W. (ed.)

1992-02-01T23:59:59.000Z

370

Prospective Climate Change Impact on Large Rivers  

E-Print Network [OSTI]

.g. long-term trends could affect hydropower, ecosystems and aquatic species...). 1917 2005 Athabasca; #12;4 Reduced Water Supply from Reservoirs Climate Change Issues in the US 1. Rainfall vs Snowmelt; 21 Prospective Climate Change Impact on Large Rivers in the US and South Korea Pierre Y. Julien Dept

Julien, Pierre Y.

371

Lower Snake River I | Open Energy Information  

Open Energy Info (EERE)

Lower Snake River I Lower Snake River I Jump to: navigation, search Name Lower Snake River I Facility Lower Snake River I Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Puget Sound Energy Developer Puget Sound Energy Energy Purchaser Puget Sound Energy Location South of Pomeroy and north of Pataha Creek in Garfield County Coordinates 46.375632°, -117.703257° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":46.375632,"lon":-117.703257,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

372

Coal River Mountain Action Several people asked for more information about the 23 June civil disobedience near Coal River  

E-Print Network [OSTI]

Coal River Mountain Action Several people asked for more information about the 23 June civil disobedience near Coal River Mountain. We need Dickens to describe the local situation, but you can glean the practice of mountaintop removal. Vernon Haltom vernoncrmw@gmail.com, head of Coal River Mountain Watch

Hansen, James E.

373

EIS-0351: Operation of Flaming Gorge Dam, Colorado River Storage Project, Colorado River, UT  

Broader source: Energy.gov [DOE]

The Secretary of the United States Department of the Interior (Secretary), acting through the Bureau of Reclamation (Reclamation), is considering whether to implement a proposed action under which Flaming Gorge Dam would be operated to achieve the flow and temperature regimes recommended in the September 2000 report Flow and Temperature Recommendations for Endangered Fishes in the Green River Downstream of Flaming Gorge Dam (2000 Flow and Temperature Recommendations), published by the Upper Colorado River Endangered Fish Recovery Program (Recovery Program).

374

Independent Specific Administrative Controls Review, Office of River  

Broader source: Energy.gov (indexed) [DOE]

Office of Office of River Protection - December 2010 Independent Specific Administrative Controls Review, Office of River Protection - December 2010 December 2010 Specific Administrative Controls Review with the Office of Environmental Management at the Office of River Protection The U.S. Department of Energy Office of Independent Oversight, within the Office of Health, Safety and Security, participated in an Office of Environmental Management Office of Standards and Quality Assurance, EM-23, review of Specific Administrative Controls (SAC). The EM-23 review included selected Office of River Protection programs at the Hanford Site. Independent Specific Administrative Controls Review, Office of River Protection - December 2010 More Documents & Publications Independent Specific Administrative Controls Review, Richland Operations

375

Savannah River National Laboratory Meets with Historically Black Colleges  

Broader source: Energy.gov (indexed) [DOE]

Savannah River National Laboratory Meets with Historically Black Savannah River National Laboratory Meets with Historically Black Colleges and Universities Savannah River National Laboratory Meets with Historically Black Colleges and Universities February 1, 2013 - 9:00am Addthis South Carolina State University students William Dumpson, left, and Alejandra Chirino, center, talk with Savannah River National Laboratory Director Dr. Terry Michalske at a recent research exchange involving the laboratory and seven historically black colleges and universities. South Carolina State University students William Dumpson, left, and Alejandra Chirino, center, talk with Savannah River National Laboratory Director Dr. Terry Michalske at a recent research exchange involving the laboratory and seven historically black colleges and universities.

376

Pearl River Valley Electric Power Association - Residential Energy  

Broader source: Energy.gov (indexed) [DOE]

Pearl River Valley Electric Power Association - Residential Energy Pearl River Valley Electric Power Association - Residential Energy Efficiency Rebate Program Pearl River Valley Electric Power Association - Residential Energy Efficiency Rebate Program < Back Eligibility Residential Savings Category Heating & Cooling Commercial Heating & Cooling Heat Pumps Appliances & Electronics Water Heating Program Info State Mississippi Program Type Utility Rebate Program Rebate Amount New Homes Heat Pump: $150 - $500 Geothermal Heat Pump: $500 Electric Water Heater: $150 Existing Homes Heat Pump: $200 Gas to Electric Water Heater Conversion: $150 Provider Pearl River Valley Electric Power Association Pearl River Valley Electric Power Association provides incentives through its Comfort Advantage Program to encourage energy efficiency within the

377

Independent Oversight Review, Savannah River Site - September 2011 |  

Broader source: Energy.gov (indexed) [DOE]

Savannah River Site - September 2011 Savannah River Site - September 2011 Independent Oversight Review, Savannah River Site - September 2011 September 2011 Review of the Implementation Verification Review Processes at the Savannah River Site Environmental Management Nuclear Facilities The Office of Enforcement and Oversight (Independent Oversight) within the Office of Health, Safety and Security (HSS), conducted an independent review of the Implementation Verification Review (IVR) Processes at Savannah River Site Environmental Management Nuclear Facilities. The overall objective of the Independent Oversight IVR review process includes verification that contractors and site offices have developed and implemented appropriate methods for performing IVRs (including direction for scheduling and conducting IVR activities) and measurement of the

378

River Falls Municipal Utilities - Renewable Energy Finance Program |  

Broader source: Energy.gov (indexed) [DOE]

River Falls Municipal Utilities - Renewable Energy Finance Program River Falls Municipal Utilities - Renewable Energy Finance Program River Falls Municipal Utilities - Renewable Energy Finance Program < Back Eligibility Residential Savings Category Other Buying & Making Electricity Solar Heating & Cooling Commercial Heating & Cooling Heating Water Heating Wind Program Info State Wisconsin Program Type PACE Financing Provider River Falls Municipal Utilities River Falls Municipal Utilities (RFMU) offers loans of $2,500 - $50,000 to its residential customers for the installation of photovoltaic (PV), solar thermal, geothermal, wind electric systems. The program will also support the installation of energy efficiency measures in connection with a qualifying renewable energy project, provided that the renewable energy

379

Savannah River National Laboratory Meets with Historically Black Colleges  

Broader source: Energy.gov (indexed) [DOE]

Savannah River National Laboratory Meets with Historically Black Savannah River National Laboratory Meets with Historically Black Colleges and Universities Savannah River National Laboratory Meets with Historically Black Colleges and Universities February 1, 2013 - 9:00am Addthis South Carolina State University students William Dumpson, left, and Alejandra Chirino, center, talk with Savannah River National Laboratory Director Dr. Terry Michalske at a recent research exchange involving the laboratory and seven historically black colleges and universities. South Carolina State University students William Dumpson, left, and Alejandra Chirino, center, talk with Savannah River National Laboratory Director Dr. Terry Michalske at a recent research exchange involving the laboratory and seven historically black colleges and universities.

380

Rappahannock River Basin Commission (Virginia) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Rappahannock River Basin Commission (Virginia) Rappahannock River Basin Commission (Virginia) Rappahannock River Basin Commission (Virginia) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Virginia Program Type Siting and Permitting Provider Rappahannock River Basin Commission The Rappahannock River Basin Commission is an independent local entity

Note: This page contains sample records for the topic "river sockeye captive" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Lumbee River EMC - Residential and Commercial Energy Efficiency Program |  

Broader source: Energy.gov (indexed) [DOE]

Lumbee River EMC - Residential and Commercial Energy Efficiency Lumbee River EMC - Residential and Commercial Energy Efficiency Program Lumbee River EMC - Residential and Commercial Energy Efficiency Program < Back Eligibility Commercial Residential Savings Category Heating & Cooling Commercial Heating & Cooling Cooling Heat Pumps Appliances & Electronics Water Heating Program Info State North Carolina Program Type Utility Rebate Program Rebate Amount Programmable Thermostat: $15 Central AC: $25 - $50 Heat Pump: $60 - $195 Geothermal Heat Pump: $350 Water Heaters: $45 - $75 Heat Pump Water Heater: $425 Refrigerator/Freezer Recycling: $50 - $75 Provider Lumbee River Electric Membership Corporation Lumbee River EMC (LREMC) offers rebates to its residential customers who purchase and install qualified energy efficient products or services.

382

Salt River Electric - Residential Energy Efficiency Rebate Program |  

Broader source: Energy.gov (indexed) [DOE]

Salt River Electric - Residential Energy Efficiency Rebate Program Salt River Electric - Residential Energy Efficiency Rebate Program Salt River Electric - Residential Energy Efficiency Rebate Program < Back Eligibility Residential Savings Category Home Weatherization Commercial Weatherization Sealing Your Home Heating & Cooling Construction Commercial Heating & Cooling Design & Remodeling Other Ventilation Heat Pumps Program Info State Kentucky Program Type Utility Rebate Program Rebate Amount Varies by technology Provider Salt River Electric Cooperative Salt River Electric serves as the rural electric provider in Kentucky's Bullitt, Nelson, Spencer, and Washington counties. Residential customers are eligible for a variety of cash incentives for energy efficiency. The Touchstone Energy Home Program provides a rebate of up to $250 to customers

383

Flathead River Creel Report, 1992-1993. Final Report.  

SciTech Connect (OSTI)

A roving creel survey was conducted on the Flathead River system, May 1992 through May 1993, as part of Hungry Horse Dam Fisheries Mitigation, funded by Bonneville Power Administration. The Flathead River system is a tributary to the Clarks Fork of the Columbia River originating in northwest Montana and southern British Columbia. The river creel survey was conducted in conjunction with a Flathead Lake creel survey. This document summarizes the creel survey on the river system. The purpose of these creel surveys was to quantify fishery status prior to mitigation efforts and provide replicative survey methodology to measure success of future mitigation activities. 4 figs., 21 tabs.

Hanzel, Delano

1995-09-01T23:59:59.000Z

384

Enforcement Documents - Savannah River Site | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Savannah River Site Savannah River Site Enforcement Documents - Savannah River Site April 13, 2010 Consent Order, Parsons Infrastructure & Technology Group, Inc. - NCO-2010-02 Consent Order issued to Parsons Infrastructure & Technology Group, Inc. related to Nuclear Facility Construction Deficiencies and Subcontractor Oversight at the Salt Waste Processing Facility at the Savannah River Site April 13, 2010 Enforcement Letter, Parsons Technology Development & Fabrication Complex - April 13, 2010 Enforcement Letter issued to Parsons Technology Development & Fabrication Complex related to Deficiencies in the Fabrication of Safety Significant Embed Plates at the Salt Waste Processing Facility at the Savannah River Site, April 13, 2010 Enforcement Letter, Amer Industrial Technologies - April 13, 2010

385

Pair-Trawl Detection of PIT-Tagged Juvenile Salmonids Migrating in the Columbia River Estuary, 2008 Report of Research.  

SciTech Connect (OSTI)

In 2008, we sampled migrating juvenile Pacific salmonids Oncorhynchus spp. tagged with passive integrated transponder (PIT) tags using a surface pair trawl in the upper Columbia River estuary (rkm 61-83). The cod-end of the trawl was replaced with a cylindrical PIT-tag detection antenna with an 86-cm-diameter fish-passage opening and two detection coils connected in series. The pair trawl was 105 m long with a 91.5-m opening between the wings and a sample depth of 4.9 m. Also during 2008, we finalized the development of a prototype 'matrix' antenna, which was larger than previous antennas by a considerable magnitude. The matrix antenna consisted of 6 coils: a 3-coil front component and a 3-coil rear component, which were separated by 1.5-m of net mesh. The fish-passage opening was 2.5 m wide by 3.0 m tall and was attached to a standard-size pair trawl net. Intermittent sampling with a single crew began on 7 March and targeted yearling Chinook salmon O. tshawytscha and steelhead O. mykiss. Daily sampling using two crews began on 30 April and continued through 14 June; during this period we detected 2.7% of all juvenile salmonids previously detected at Bonneville Dam--a measure of sample efficiency. Sampling with a single crew continued through 20 August and targeted subyearling Chinook salmon. We detected 7,397 yearling Chinook salmon, 2,735 subyearling Chinook salmon, 291 coho salmon O. kisutch, 5,950 steelhead, and 122 sockeye salmon O. nerka in the upper estuary. We deployed the matrix antenna system and the older, cylindrical antenna system (86-cm-diameter fish-passage opening) simultaneously in mid-May 2008 to test matrix detection efficiency. The cylindrical antenna system had been used successfully in 2007 and early 2008. Because distribution of migrating salmonids in the estuary changes rapidly, we felt that a tandem sampling effort between the two systems was the only way to truly evaluate comparative detection efficiency. We deployed both systems within 1 km of each other during a period of high fish densities on 13, 14, and 15 May. Detections of the matrix system surpassed those of the cylindrical system by 53% in 14 h of simultaneous sampling (total detections 716 and 339, respectively). We believe that the higher detection rate observed with the matrix system was due to fewer smolts escaping the trawl entrance and to more smolts readily passing through the larger fish-passage opening. After tandem sampling, we continued exclusive use of the matrix system for the remainder of the 2008 juvenile migration season. Mean survival rates from Lower Granite to Bonneville Dam for yearling Chinook salmon and steelhead were 42% (SE = 3.7%) and 46% (SE = 1.5%), respectively. Over 358,000 PIT-tagged salmonids were transported, and we detected 4,619 of these fish.

Magie, Robert J.; Morris, Matthew S.; Ledgerwood, Richard D. [Northwest Fisheries Science Center

2009-06-03T23:59:59.000Z

386

An Inside Look at River Corridor | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

An Inside Look at River Corridor An Inside Look at River Corridor An Inside Look at River Corridor July 16, 2012 - 1:04pm Addthis "River Corridor" provides viewers with a look at the cleanup of hundreds of contaminated buildings and more than one thousand areas where soil was contaminated along the 50-mile stretch of the Columbia River that flows through the Hanford Site in southeast Washington State. Amanda Scott Amanda Scott Former Managing Editor, Energy.gov In the seventh chapter of The Handford Story, the Energy Department takes a look at the River Corridor -- a 50-mile stretch of the Columbia River that flows through the Hanford site in southeast Washington State. This video provides you with an insiders look at the cleanup of contaminated buildings and soil. Watch the video above to get a look inside the Energy

387

Deep drilling data Raft River geothermal area, Idaho | Open Energy  

Open Energy Info (EERE)

drilling data Raft River geothermal area, Idaho drilling data Raft River geothermal area, Idaho Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Report: Deep drilling data Raft River geothermal area, Idaho Details Activities (2) Areas (1) Regions (0) Abstract: Stratigraphy and geophysical logs of three petroleum test boreholes in the Raft River Valley are presented. The geophysical logs include: temperature, resistivity, spontaneous potential, gamma, caliper, and acoustic logs. Author(s): Oriel, S. S.; Williams, P. L.; Covington, H. R.; Keys, W. S.; Shaver, K. C. Published: DOE Information Bridge, 1/1/1978 Document Number: Unavailable DOI: 10.2172/6272996 Source: View Original Report Exploratory Well At Raft River Geothermal Area (1975) Exploratory Well At Raft River Geothermal Area (1976) Raft River Geothermal Area

388

Geophysical Method At Raft River Geothermal Area (1977) | Open Energy  

Open Energy Info (EERE)

Geophysical Method At Raft River Geothermal Area (1977) Geophysical Method At Raft River Geothermal Area (1977) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geophysical Method At Raft River Geothermal Area (1977) Exploration Activity Details Location Raft River Geothermal Area Exploration Technique Geophysical Techniques Activity Date 1977 Usefulness not indicated DOE-funding Unknown Notes Borehole geophysics were completed at the Raft River valley, Idaho. References Applegate, J.K.; Donaldson, P.R.; Hinkley, D.L.; Wallace, T.L. (1 February 1977) Borehole geophysics evaluation of the Raft River geothermal reservoir, Idaho Retrieved from "http://en.openei.org/w/index.php?title=Geophysical_Method_At_Raft_River_Geothermal_Area_(1977)&oldid=594349" Category: Exploration Activities

389

Geophysical Method At Raft River Geothermal Area (1975) | Open Energy  

Open Energy Info (EERE)

Method At Raft River Geothermal Area (1975) Method At Raft River Geothermal Area (1975) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geophysical Method At Raft River Geothermal Area (1975) Exploration Activity Details Location Raft River Geothermal Area Exploration Technique Geophysical Techniques Activity Date 1975 Usefulness not indicated DOE-funding Unknown Notes Geologic and geophysics studies were completed at the Raft River valley. References Williams, P.L.; Mabey, D.R.; Pierce, K.L.; Zohdy, A.A.R.; Ackermann, H.; Hoover, D.B. (1 May 1975) Geological and geophysical studies of a geothermal area in the southern Raft river valley, Idaho Retrieved from "http://en.openei.org/w/index.php?title=Geophysical_Method_At_Raft_River_Geothermal_Area_(1975)&oldid=59434

390

Independent Activity Report, Savannah River Site - July 2010 | Department  

Broader source: Energy.gov (indexed) [DOE]

Independent Activity Report, Savannah River Site - July 2010 Independent Activity Report, Savannah River Site - July 2010 Independent Activity Report, Savannah River Site - July 2010 July 2010 Savannah River Site Salt Waste Processing Facility Construction Project Review A Department of Energy Construction Project Review (CPR) of the Salt Waste Processing Facility (SWPF) project was conducted on July 19-22, 2010, at the request of the Principal Deputy Secretary, Office of Environmental Management (EM-2). The purpose of the review was to assess the cost, schedule, and technical progress against the approved Performance Baseline. Independent Activity Report, Savannah River Site - July 2010 More Documents & Publications Independent Activity Report, Savannah River Site - September 2010 Independent Activity Report, Savannah River Site - May 2010

391

Distribution of Chironomidae (Insecta: Diptera) in polluted rivers of the Juru River Basin, Penang, Malaysia  

Science Journals Connector (OSTI)

The influence of physical and chemical parameters on the abundance and diversity of chironomids was studied in six rivers with moderate to highly polluted water in the Juru River Basin. The rivers: Ceruk Tok Kun (CTKR) as reference site, and polluted rivers of Pasir (PR), Juru (JR), Permatang Rawa (PRR), Ara (AR) and Kilang Ubi (KUR) were sampled over a period of five months (November 2007-March 2008). Nine chirnomid species: Chironimus kiiensis, C. javanus, Polypedilum trigonus, Microchironomus sp., Dicrotendipes sp., Tanytarsus formosanus, Clinotanypus sp., Tanypus punctipennis and Fittkauimyia sp. were identified. Assessment of their relationships with several environmental parameters was performed using the canonical correspondence analysis (CCA). Tanytarsus formosanus was the most dominant in the relatively clean CTKR and moderately polluted JR with mean densities of 19.66 and 25.32 m?2, respectively while C. kiiensis was abundant in more polluted rivers. Tanytarsus formosanus, Dicrotendipes sp. and Microchironomus sp. were grouped under moderate to high water temperature, total organic matter (TOM), total suspended solids (TSS), velocity, pH, phosphates and sulphates. However, Tanypus punctipennis, Fittkauimyia sp., and Clinotanypus sp. were associated with high contents of river sediment such as TOM, Zn and Mn and water ammonium-N and nitrate-N and they were associated with higher dissolved oxygen (DO) content in the water. Chironomus kiiensis, C. javanus and P. trigonus showed positive relationships with TOM, ammonium-N and nitrate-N as well as trace metals of Zn, Cu and Mn. These three species could be considered as tolerant species since they have the ability to survive in extreme environmental conditions with low DO and high concentrations of pollutants. Based on the water parameter scores in all rivers, the highest diversity of chironomid larvae was reported in CTKR. With higher concentrations of organic and/or inorganic pollutants as reported in PPR, KUR and AR, the chironomid larval diversity decreased, and the abundance of tolerant species, mainly Chironomus spp., increased.

Salman A. Al-Shami; Che Salmah Md Rawi; Abu HassanAhmad; Siti Azizah Mohd Nor

2010-01-01T23:59:59.000Z

392

Office of River Protection (ORP) and Washingotn River Protection Solutions, LLC (WRPS) Partnering Agreement for the DOE-EM Tank Operations Project  

Broader source: Energy.gov [DOE]

The Mission of the Office of River Protection is to safely retrieve and treat Hanford's tank waste and close the Tank Farms to protect the Columbia River.

393

Reese River Geothermal Project | Open Energy Information  

Open Energy Info (EERE)

Reese River Geothermal Project Reese River Geothermal Project Project Location Information Coordinates 39.034444444444°, -116.67666666667° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.034444444444,"lon":-116.67666666667,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

394

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

December 17, 2009 December 17, 2009 CX-000810: Categorical Exclusion Determination Ceramic Synthesis and Gas Permeation Measurements in 735-11A CX(s) Applied: B3.6 Date: 12/17/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office December 17, 2009 CX-000809: Categorical Exclusion Determination Cut, Remove and Replace Off-Gas Exhaust Fan #2 and #3 foundation and Replace Air Monitor Fan #1 and #2 CX(s) Applied: B1.3 Date: 12/17/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office December 17, 2009 CX-000808: Categorical Exclusion Determination Howard T. Ricketts Regional Biocontainment Laboratory 134 CX(s) Applied: B3.6 Date: 12/17/2009 Location(s): Aiken, South Carolina

395

Microsoft Word - CX_Okanogan_River.docx  

Broader source: Energy.gov (indexed) [DOE]

4, 2012 4, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Dave Roberts Project Manager - KEWU-4 Proposed Action: Provision of funds to the Colville Confederated Tribes for the purchase of two parcels of land along the Okanogan River. Fish and Wildlife Project No.: 2007-224-00 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Transfer of land/habitat preservation, wildlife management. Location: The Okanogan River properties are located south of the town of Omak, in Okanogan County, Washington. Proposed by: Bonneville Power Administration (BPA) and the Colville Confederated Tribes (CCT). Description of the Proposed Action: BPA proposes to fund the acquisition of two properties

396

Hood River Electric Coop | Open Energy Information  

Open Energy Info (EERE)

Hood River Electric Coop Hood River Electric Coop Place Oregon Utility Id 8830 Utility Location Yes Ownership C NERC Location WECC NERC WECC Yes Activity Buying Transmission Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Commercial Commercial Irrigation Commercial Outdoor Lighting 100 watt HPS Light Lighting Outdoor Lighting 200 watt HPS Light Lighting Residential Residential Residential B Residential Residential Three Phase Residential Average Rates Residential: $0.0656/kWh Commercial: $0.0641/kWh Industrial: $0.0522/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a"

397

American River Ventures | Open Energy Information  

Open Energy Info (EERE)

American River Ventures American River Ventures Place Roseville, California Sector Efficiency Product Early-stage venture capital firm, ARV invests in new technologies which provide a platform for a sustainable future, specifically, energy efficiency, energy intelligence and advanced materials. Coordinates 41.865599°, -76.958585° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.865599,"lon":-76.958585,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

398

Salt River Project | Open Energy Information  

Open Energy Info (EERE)

Project Project Jump to: navigation, search Name Salt River Project Place Tempe, Arizona Utility Id 16572 Utility Location Yes Ownership P NERC Location WECC NERC WECC Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes Activity Wholesale Marketing Yes Activity Bundled Services Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] SGIC[2] Energy Information Administration Form 826[3] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Salt River Project Smart Grid Project was awarded $56,859,359 Recovery Act Funding with a total project value of $114,003,719.

399

Twin Rivers Technologies | Open Energy Information  

Open Energy Info (EERE)

Rivers Technologies Rivers Technologies Address 780 Washington Street Place Quincy, Massachusetts Zip 02169 Sector Biofuels Product Developing vegetable oil based biofuels Website http://www.twinriverstechnolog Coordinates 42.2452749°, -70.9698774° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.2452749,"lon":-70.9698774,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

400

Scenic Rivers Energy Coop | Open Energy Information  

Open Energy Info (EERE)

Scenic Rivers Energy Coop Scenic Rivers Energy Coop Place Wisconsin Utility Id 16740 Utility Location Yes Ownership C NERC Location MRO NERC MRO Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Commercial Power Commercial Commercial Power with Water Heater Load Control Commercial Controlled Electric Loads- Controlled Electric Residential Controlled Electric Loads- Off-Peak Storage Residential Large Power Industrial Large Power with Water Heater Load Control Industrial Multiple Site Single Phase Rate Residential Peak Alert Commercial Residential and Small Commercial Service Residential

Note: This page contains sample records for the topic "river sockeye captive" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Rock River Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Wind Farm Wind Farm Jump to: navigation, search Name Rock River Wind Farm Facility Rock River Wind Farm Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Shell Wind Energy Developer SeaWest Energy Purchaser PacifiCorp Location Arlington and Carbon Counties WY Coordinates 41.6996°, -107.003° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.6996,"lon":-107.003,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

402

The Savannah River Site's Groundwater Monitoring Program  

SciTech Connect (OSTI)

The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site's Groundwater Monitoring Program. During fourth quarter 1989 (October--December), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. An explanation of flagging criteria for the fourth quarter is presented in the Flagging Criteria section of this document. All analytical results from fourth quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

Not Available

1989-01-01T23:59:59.000Z

403

River Protection Project (RPP) Project Management Plan  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE), in accordance with the Strom Thurmond National Defense Authorization Act for Fiscal Year 1999, established the Office of River Protection (ORP) to successfully execute and manage the River Protection Project (RPP), formerly known as the Tank Waste Remediation System (TWRS). The mission of the RPP is to store, retrieve, treat, and dispose of the highly radioactive Hanford tank waste in an environmentally sound, safe, and cost-effective manner. The team shown in Figure 1-1 is accomplishing the project. The ORP is providing the management and integration of the project; the Tank Farm Contractor (TFC) is responsible for providing tank waste storage, retrieval, and disposal; and the Privatization Contractor (PC) is responsible for providing tank waste treatment.

SEEMAN, S.E.

2000-04-01T23:59:59.000Z

404

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

May 16, 2011 May 16, 2011 CX-006405: Categorical Exclusion Determination 707-C Storm Drain Repairs CX(s) Applied: B1.3 Date: 05/16/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office May 13, 2011 CX-006406: Categorical Exclusion Determination Silver Chloride Injection at the F Area Hazardous Waste Management Facilities Barrier Wall CX(s) Applied: B6.9 Date: 05/13/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office May 12, 2011 CX-006407: Categorical Exclusion Determination Removal of Inactive Chromate Water Isolation Valves CRW-V-170 and CRW-V-175 and Installation of 3 Inch Blind Flanges for F-area New Hill CX(s) Applied: B1.3 Date: 05/12/2011 Location(s): Aiken, South Carolina

405

Powder River Energy Corporation | Open Energy Information  

Open Energy Info (EERE)

Jump to: navigation, search Jump to: navigation, search Name Powder River Energy Corporation Place Sundance, Wyoming Website precorp.coop/ Utility Id 19156 Utility Location Yes Ownership C NERC Location WECC Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] SGIC[2] Energy Information Administration Form 826[3] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Powder River Energy Corporation Smart Grid Project was awarded $2,554,807 Recovery Act Funding with a total project value of $5,109,614. Utility Rate Schedules Grid-background.png General Service (GS)-Single Phase Commercial General Service (GS)-Three phase Commercial General Service-Coal Bed Methane (GS-CBM)-Single Phase Commercial

406

Crossing the River: Xiangxi Miao Spirit Mediumship  

E-Print Network [OSTI]

ones own or the other clan, they can cause sufferings and misfortunes, and should be exorcised through performing rituals (Wu 2001: 72). However, rituals of exorcism are usually performed by the zimei medium after a period of several years... Crossing the River: Xiangxi Miao Spirit Mediumship By Copyright 2010 Hexian Wu Submitted to the graduate degree program in the Department of Anthropology and the Graduate Faculty of the University of Kansas in partial...

Wu, Hexian

2010-12-16T23:59:59.000Z

407

Cesium in the Savannah River Site environment  

SciTech Connect (OSTI)

Cesium in the Savannah River Site Environment is published as a part of the Radiological Assessment Program (RAP). It is the fourth in a series of eight documents on individual radioisotopes released to the environment as a result of Savannah River Site (SRS) operations. The earlier documents describe the environmental consequences of tritium, iodine, and uranium. Documents on plutonium, strontium, carbon, and technetium will be published in the future. These are dynamic documents and current plans call for revising and updating each one on a two-year schedule.Radiocesium exists in the environment as a result of above-ground nuclear weapons tests, the Chernobyl accident, the destruction of satellite Cosmos 954, small releases from reactors and reprocessing plants, and the operation of industrial, medical, and educational facilities. Radiocesium has been produced at SRS during the operation of five production reactors. Several hundred curies of [sup 137]Cs was released into streams in the late 50s and 60s from leaking fuel elements. Smaller quantities were released from the fuel reprocessing operations. About 1400 Ci of [sup 137]Cs was released to seepage basins where it was tightly bound by clay in the soil. A much smaller quantity, about four Ci. was released to the atmosphere. Radiocesium concentration and mechanisms for atmospheric, surface water, and groundwater have been extensively studied by Savannah River Technology Center (SRTC) and ecological mechanisms have been studied by Savannah River Ecology Laboratory (SREL). The overall radiological impact of SRS releases on the offsite maximum individual can be characterized by total doses of 033 mrem (atmospheric) and 60 mrem (liquid), compared with a dose of 12,960 mrem from non-SRS sources during the same period of time. Isotope [sup 137]Cs releases have resulted in a negligible risk to the environment and the population it supports.

Carlton, W.H.; Bauer, L.R.; Evans, A.G.; Geary, L.A.; Murphy, C.E. Jr.; Pinder, J.E.; Strom, R.N.

1992-03-01T23:59:59.000Z

408

Cesium in the Savannah River Site environment  

SciTech Connect (OSTI)

Cesium in the Savannah River Site Environment is published as a part of the Radiological Assessment Program (RAP). It is the fourth in a series of eight documents on individual radioisotopes released to the environment as a result of Savannah River Site (SRS) operations. The earlier documents describe the environmental consequences of tritium, iodine, and uranium. Documents on plutonium, strontium, carbon, and technetium will be published in the future. These are dynamic documents and current plans call for revising and updating each one on a two-year schedule.Radiocesium exists in the environment as a result of above-ground nuclear weapons tests, the Chernobyl accident, the destruction of satellite Cosmos 954, small releases from reactors and reprocessing plants, and the operation of industrial, medical, and educational facilities. Radiocesium has been produced at SRS during the operation of five production reactors. Several hundred curies of {sup 137}Cs was released into streams in the late 50s and 60s from leaking fuel elements. Smaller quantities were released from the fuel reprocessing operations. About 1400 Ci of {sup 137}Cs was released to seepage basins where it was tightly bound by clay in the soil. A much smaller quantity, about four Ci. was released to the atmosphere. Radiocesium concentration and mechanisms for atmospheric, surface water, and groundwater have been extensively studied by Savannah River Technology Center (SRTC) and ecological mechanisms have been studied by Savannah River Ecology Laboratory (SREL). The overall radiological impact of SRS releases on the offsite maximum individual can be characterized by total doses of 033 mrem (atmospheric) and 60 mrem (liquid), compared with a dose of 12,960 mrem from non-SRS sources during the same period of time. Isotope {sup 137}Cs releases have resulted in a negligible risk to the environment and the population it supports.

Carlton, W.H.; Bauer, L.R.; Evans, A.G.; Geary, L.A.; Murphy, C.E. Jr.; Pinder, J.E.; Strom, R.N.

1992-03-01T23:59:59.000Z

409

Monitoring groundwater and river interaction along the Hanford reach of the Columbia River  

SciTech Connect (OSTI)

As an adjunct to efficient Hanford Site characterization and remediation of groundwater contamination, an automatic monitor network has been used to measure Columbia River and adjacent groundwater levels in several areas of the Hanford Site since 1991. Water levels, temperatures, and electrical conductivity measured by the automatic monitor network provided an initial database with which to calibrate models and from which to infer ground and river water interactions for site characterization and remediation activities. Measurements of the dynamic river/aquifer system have been simultaneous at 1-hr intervals, with a quality suitable for hydrologic modeling and for computer model calibration and testing. This report describes the equipment, procedures, and results from measurements done in 1993.

Campbell, M.D.

1994-04-01T23:59:59.000Z

410

Engineering assessment of inactive uranium mill tailings, Green River Site, Green River, Utah  

SciTech Connect (OSTI)

Ford, Bacon and Davis Utah Inc. has reevaluated the Green River site in order to revise the December 1977 engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Green River, Utah. This evaluation has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative remedial actions. Radon gas released from the 123,000 tons of tailings at the Green River site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors.

none,

1981-08-01T23:59:59.000Z

411

Potomac River Project Outage Schedule Clarification | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

River Project Outage Schedule Clarification River Project Outage Schedule Clarification Potomac River Project Outage Schedule Clarification Docket No. EO-05-01. Order No. 202-07-02: Based on the most current information we have for both circuits, the new outage dates are listed below: Outage Duration Feeder Out April 30, 2007 - June 1, 2007 Circuit 1 June 2, 2007 - July 1, 2007 Circuit 2 Potomac River Project Outage Schedule Clarification More Documents & Publications Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) evised plan for transmission outages for the 230 kV circuits PEPCO Comments on Special Environmental Analysis For Actions Taken Under U.S. Department of Energy Emergency Orders Regarding Operation of the Potomac River Generating Station in Alexandria, Virginia

412

Savannah River Site Contractor Receives Project Management Institute Award  

Broader source: Energy.gov (indexed) [DOE]

Savannah River Site Contractor Receives Project Management Savannah River Site Contractor Receives Project Management Institute Award Savannah River Site Contractor Receives Project Management Institute Award November 15, 2011 - 12:00pm Addthis SRR Bubbler Project Manager Bill Pepper, center, accepts the PMI Project of the Year award from Eloy Saldivar, left, president of the Savannah River Chapter of PMI. DWPF Facility Manager Les Sonnenberg is on the right. SRR Bubbler Project Manager Bill Pepper, center, accepts the PMI Project of the Year award from Eloy Saldivar, left, president of the Savannah River Chapter of PMI. DWPF Facility Manager Les Sonnenberg is on the right. AIKEN, S.C. - The local chapter of the Project Management Institute (PMI) recently honored the Savannah River Site liquid waste contractor with its

413

Enforcement Letter, Westinghouse Savannah River Company - April 15, 1997 |  

Broader source: Energy.gov (indexed) [DOE]

Savannah River Company - April 15, Savannah River Company - April 15, 1997 Enforcement Letter, Westinghouse Savannah River Company - April 15, 1997 April 15, 1997 Issued to Westinghouse Savannah River Company related to Potential Violations of Quality Assurance and Work Process Requirements at the Savannah River Site On February 11, 1997, the Office of Enforcement and Investigation (EH-10) met with members of your staff and the DOE Savannah River Operations Office (DOE-SR) to review your progress in correcting the noncompliances identified in the subject Noncompliance Tracking System (NTS) reports. A summary of our meeting and assessment of the information provided is enclosed with this letter. Your evaluation of the events and conditions leading to each of the occurrences, reported to EH-10 in the subject NTS reports, has identified

414

Potomac River Project Outage Schedule Clarification | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Potomac River Project Outage Schedule Clarification Potomac River Project Outage Schedule Clarification Potomac River Project Outage Schedule Clarification Docket No. EO-05-01. Order No. 202-07-02: Based on the most current information we have for both circuits, the new outage dates are listed below: Outage Duration Feeder Out April 30, 2007 - June 1, 2007 Circuit 1 June 2, 2007 - July 1, 2007 Circuit 2 Potomac River Project Outage Schedule Clarification More Documents & Publications Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) evised plan for transmission outages for the 230 kV circuits Notification of Planned 230kV Outage at Potomac River Generating Station PEPCO Comments on Special Environmental Analysis For Actions Taken Under U.S. Department of Energy Emergency Orders Regarding Operation of the

415

Independent Activity Report, Savannah River Site - June 2010 | Department  

Broader source: Energy.gov (indexed) [DOE]

June 2010 June 2010 Independent Activity Report, Savannah River Site - June 2010 June 2010 Savannah River Site Salt Waste Processing Facility Construction Site Orientation Visit The U.S. Department of Energy (DOE) Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), conducted an orientation visit on June 21-25, 2010, at the Salt Waste Processing Facility (SWPF) construction site at the DOE Savannah River Site (SRS). The purpose of the visit was to determine methods for HSS to carry out its independent oversight responsibilities with respect to this project in coordination with DOE's Savannah River Operations Office (DOE-SR). Independent Activity Report, Savannah River Site - June 2010 More Documents & Publications Independent Activity Report, Savannah River Site - May 2010

416

Wabash River Coal Gasification Repowering Project Final Technical Report  

Office of Scientific and Technical Information (OSTI)

Wabash River Coal Gasification Wabash River Coal Gasification Repowering Project Final Technical Report August 2000 Work Performed Under Cooperative Agreement DE-FC21-92MC29310 For: The U.S. Department of Energy Office of Fossil Energy National Energy Technology Laboratory Morgantown, West Virginia Prepared by: The Men and Women of Wabash River Energy Ltd. For Further Information Contact: Roy A. Dowd, CHMM Environmental Supervisor Wabash River Coal Gasification Repowering Project 444 West Sandford Avenue West Terre Haute, IN 47885 LEGAL NOTICE/DISCLAIMER This report was prepared by the Wabash River Coal Gasification Repowering Project Joint Venture pursuant to a Cooperative Agreement partially funded by the U.S. Department of Energy, and neither the Wabash River Coal Gasification Repowering

417

Magnetotellurics At Raft River Geothermal Area (1977) | Open Energy  

Open Energy Info (EERE)

Magnetotellurics At Raft River Geothermal Area (1977) Magnetotellurics At Raft River Geothermal Area (1977) Exploration Activity Details Location Raft River Geothermal Area Exploration Technique Magnetotellurics Activity Date 1977 Usefulness useful DOE-funding Unknown Notes Magnetotelluric soundings along a profile extending from the Raft River geothermal area in southern Idaho in Yellowstone National Park in Wyoming reveal a highly anomalous crustal structure involving a conductive zone at depths that range from 18 km in the central part of the eastern Snake River Plain to 7 km beneath the Raft River thermal area and as little as 5 km in Yellowstone. Resistivities in this conductive zone are less than 10 ohm-m and at some sites than 1 ohm-m. References Stanley, W.D.; Boehl, J.E.; Bostick, F.X.; Smith, H.W. (10 June

418

Independent Oversight Activity Report, Office of River Protection - May  

Broader source: Energy.gov (indexed) [DOE]

Office of River Protection - Office of River Protection - May 2013 Independent Oversight Activity Report, Office of River Protection - May 2013 May 2013 Operational Awareness Visit at the Office of River Protection [HAIR-HANFORD-2013-05-13] The Office of Health, Safety and Security (HSS) Office of Safety and Emergency Management Evaluations (HS-45) Site Lead conducted an operational awareness visit to the Office of River Protection (ORP) to observe contractor efforts to develop a hazards analysis for the Low Activity Waste facility of the Waste Treatment and Immobilization Plant (WTP), tour the WTP construction site, observe ORP's quality assurance audit of the WTP contractor (Bechtel National, Inc.), tour the Hanford Tank Farms, and observe tank waste retrieval operations. Independent Oversight Activity Report, Office of River Protection - May

419

A Milestone for Savannah River Site | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

A Milestone for Savannah River Site A Milestone for Savannah River Site A Milestone for Savannah River Site October 21, 2010 - 4:38pm Addthis Employees of the Savannah River Site's M Area Operable Unit (MAOU) gather at the completed site. Employees of the Savannah River Site's M Area Operable Unit (MAOU) gather at the completed site. Dr. Ines Triay I had the privilege yesterday to celebrate history and embrace the future at the first Savannah River Site (SRS) Area Completion under the American Recovery and Reinvestment Act. I was one of about 250 people gathered at the M Area Operable Unit (MAOU) area completion event that marked the end of an era at SRS. During the Cold War, M Area was the site of three support buildings used to fabricate fuel targets for the Site's reactors; home to the Liquid Effluent Treatment

420

MHK Technologies/Microturbine River In Stream | Open Energy Information  

Open Energy Info (EERE)

Microturbine River In Stream Microturbine River In Stream < MHK Technologies Jump to: navigation, search << Return to the MHK database homepage Microturbine River In Stream.png Technology Profile Primary Organization Whitestone Power Communications Project(s) where this technology is utilized *MHK Projects/Microturbine River In Stream Technology Resource Click here Current/Tidal Technology Type Click here Axial Flow Turbine Technology Readiness Level Click here TRL 5/6: System Integration and Technology Laboratory Demonstration Technology Description HDPE blades are the only moving parts in the water.This gives the turbine high resistance to silty or salty water. Blades designed to survive impact of 1500 lb object. HDPE provides flexibility and strength. Blades penetrate water 24 inches allowing for deep and shallow operation. Mounting design allows for variable depth operation for varying river conditions.All submerged prime-mover parts constructed from HDPE. No underwater gearboxes, generators or electrical cables. Velocity of blades 50% of velocity of river current.

Note: This page contains sample records for the topic "river sockeye captive" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Preliminary Notice of Violation, Savannah River Nuclear Solutions, LLC -  

Broader source: Energy.gov (indexed) [DOE]

Preliminary Notice of Violation, Savannah River Nuclear Solutions, Preliminary Notice of Violation, Savannah River Nuclear Solutions, LLC - WEA-2010-05 Preliminary Notice of Violation, Savannah River Nuclear Solutions, LLC - WEA-2010-05 October 7, 2010 Preliminary Notice of Violation issued to Savannah River Nuclear Solutions, LLC related to a Nitric Acid Spill Event and an Electrical Arc Flash Injury Event at the Savannah River Site This letter refers to the Office of Health, Safety and Security's Office of Enforcement investigation into the facts and circumstances surrounding the nitric acid spill event that occurred in F Area on August 18, 2009, and the electrical arc flash injury that occurred in the D Area powerhouse on September 23, 2009, at the Savannah River Site. Based on an evaluation of the evidence in this matter, the U.S. Department of Energy (DOE) has

422

A Milestone for Savannah River Site | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

A Milestone for Savannah River Site A Milestone for Savannah River Site A Milestone for Savannah River Site October 21, 2010 - 4:38pm Addthis Employees of the Savannah River Site's M Area Operable Unit (MAOU) gather at the completed site. Employees of the Savannah River Site's M Area Operable Unit (MAOU) gather at the completed site. Dr. Ines Triay I had the privilege yesterday to celebrate history and embrace the future at the first Savannah River Site (SRS) Area Completion under the American Recovery and Reinvestment Act. I was one of about 250 people gathered at the M Area Operable Unit (MAOU) area completion event that marked the end of an era at SRS. During the Cold War, M Area was the site of three support buildings used to fabricate fuel targets for the Site's reactors; home to the Liquid Effluent Treatment

423

Preliminary Notice of Violation,Savannah River Nuclear Solutions, LLC -  

Broader source: Energy.gov (indexed) [DOE]

Savannah River Nuclear Solutions, Savannah River Nuclear Solutions, LLC - NEA-2011-02 Preliminary Notice of Violation,Savannah River Nuclear Solutions, LLC - NEA-2011-02 July 22, 2011 Preliminary Notice of Violation issued to Savannah River Nuclear Solutions, LLC related to a Puncture Wound Injury resulting in a Radiological Uptake at the Savannah River Site This letter refers to the Office of Health, Safety and Security's Office of Enforcement and Oversight investigation into the facts and circumstances associated with the June 14, 2010, employee puncture wound injury, which occurred in the F-TRU Remediation Enclosure within the F-Canyon Facility, at the U.S. Department of Energy' s (DOE) Savannah River Site. This occurrence was reported in Noncompliance Tracking System (NTS) report NTS-SRSO--SRNS-CPWM-20IO-0002, Contaminated Puncture Wound During TRU Drum

424

Enforcement Letter, Savannah River Ecology Laboratory - June 7, 2000 |  

Broader source: Energy.gov (indexed) [DOE]

Savannah River Ecology Laboratory - June 7, Savannah River Ecology Laboratory - June 7, 2000 Enforcement Letter, Savannah River Ecology Laboratory - June 7, 2000 June 7, 2000 Issued to Savannah River Ecology Laboratory related to Radioactive Material Control Deficiencies at the Savannah River Site This letter refers to the Department of Energy's (DOE) evaluation of radioactive material control deficiencies occurring at the Savannah River Ecology Laboratory (SREL) in September 1999. During the underlying event, SREL investigators transported radioactive environmental samples from the Ukraine to SREL and University of Georgia facilities without appropriate labeling, monitoring, and controls. These deficiencies were identified in September 1999; however, they were not formally reported to DOE via the Noncompliance Tracking System (NTS) until March 14, 2000. The Office

425

Numerical Modeling At Raft River Geothermal Area (1983) | Open Energy  

Open Energy Info (EERE)

Raft River Geothermal Area (1983) Raft River Geothermal Area (1983) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Numerical Modeling At Raft River Geothermal Area (1983) Exploration Activity Details Location Raft River Geothermal Area Exploration Technique Numerical Modeling Activity Date 1983 Usefulness not indicated DOE-funding Unknown Notes The numerical modeling of the resistivity data is marginal for changes as small as those observed but the results suggest that changes of a few percent could be expected from a fracture zone extending from depth to within 100 m of the surface. References Sill, W. R. (1 September 1983) Resistivity measurements before and after injection Test 5 at Raft River KGRA, Idaho. Final report Retrieved from "http://en.openei.org/w/index.php?title=Numerical_Modeling_At_Raft_River_Geothermal_Area_(1983)&oldid=47387

426

Final Technical Resource Confirmation Testing at the Raft River Geothermal  

Open Energy Info (EERE)

Final Technical Resource Confirmation Testing at the Raft River Geothermal Final Technical Resource Confirmation Testing at the Raft River Geothermal Project, Cassia County, Idaho Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Report: Final Technical Resource Confirmation Testing at the Raft River Geothermal Project, Cassia County, Idaho Details Activities (1) Areas (1) Regions (0) Abstract: Incorporates the results of flow tests for geothermal production and injection wells in the Raft River geothermal field in southern Idaho. Interference testing was also accomplished across the wellfield. Author(s): Glaspey, Douglas J. Published: DOE Information Bridge, 1/30/2008 Document Number: Unavailable DOI: 10.2172/922630 Source: View Original Report Flow Test At Raft River Geothermal Area (2008) Raft River Geothermal Area Retrieved from

427

Sabine River Compact (Multiple States) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Sabine River Compact (Multiple States) Sabine River Compact (Multiple States) Sabine River Compact (Multiple States) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Water Buying & Making Electricity Home Weatherization Program Info State Texas Program Type Siting and Permitting Provider Sabine River Compact Commission The Sabine River Compact Commission administers the Sabine River Compact to ensure that Texas receives its equitable share of quality water from the

428

CRAD, Emergency Management - Office of River Protection K Basin Sludge  

Broader source: Energy.gov (indexed) [DOE]

Office of River Protection K Basin Office of River Protection K Basin Sludge Waste System CRAD, Emergency Management - Office of River Protection K Basin Sludge Waste System May 2004 A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a May 2004 assessment of the Emergency Management program at the Office of River Protection K Basin Sludge Waste System. CRADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, Emergency Management - Office of River Protection K Basin Sludge Waste System More Documents & Publications CRAD, Engineering - Office of River Protection K Basin Sludge Waste System

429

Independent Activity Report, Savannah River Site - May 2010 | Department of  

Broader source: Energy.gov (indexed) [DOE]

May 2010 May 2010 Independent Activity Report, Savannah River Site - May 2010 May 2010 Savannah River Site Salt Waste Processing Facility Construction Site Walkthrough The U.S. Department of Energy (DOE), Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), conducted a visit to the Savannah River Site (SRS) on May 4-5, 2010. The visit focused on the Salt Waste Processing Facility (SWPF) Construction Site, which is managed by Parsons with DOE line management program direction and oversight from the DOE Savannah River Operations Office. Independent Activity Report, Savannah River Site - May 2010 More Documents & Publications Independent Activity Report, Savannah River Site - June 2010 Consent Order, Parsons Infrastructure & Technology Group, Inc. -

430

Enforcement Letter, Savannah River Ecology Laboratory - June 7, 2000 |  

Broader source: Energy.gov (indexed) [DOE]

Savannah River Ecology Laboratory - June 7, Savannah River Ecology Laboratory - June 7, 2000 Enforcement Letter, Savannah River Ecology Laboratory - June 7, 2000 June 7, 2000 Issued to Savannah River Ecology Laboratory related to Radioactive Material Control Deficiencies at the Savannah River Site This letter refers to the Department of Energy's (DOE) evaluation of radioactive material control deficiencies occurring at the Savannah River Ecology Laboratory (SREL) in September 1999. During the underlying event, SREL investigators transported radioactive environmental samples from the Ukraine to SREL and University of Georgia facilities without appropriate labeling, monitoring, and controls. These deficiencies were identified in September 1999; however, they were not formally reported to DOE via the Noncompliance Tracking System (NTS) until March 14, 2000. The Office

431

Snake River Plain Geothermal Region | Open Energy Information  

Open Energy Info (EERE)

Snake River Plain Geothermal Region Snake River Plain Geothermal Region (Redirected from Snake River Plain) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Snake River Plain Geothermal Region Details Areas (8) Power Plants (1) Projects (2) Techniques (11) Map: {{{Name}}} "The Snake River Plain is a large arcuate structural trough that characterizes the topography of southern Idaho that can be divided into three sections: western, central, and eastern. The western Snake River Plain is a large tectonic graben or rift valley filled with several km of lacustrine (lake) sediments; the sediments are underlain by rhyolite and basalt, and overlain by basalt. The western plain began to form around 11-12 Ma with the eruption of rhyolite lavas and ignimbrites. The western plain is not parallel to North American Plate motion, and lies at a high

432

John C. Barnes of Savannah River Operations named 2012 Facility  

Broader source: Energy.gov (indexed) [DOE]

John C. Barnes of Savannah River Operations named 2012 Facility John C. Barnes of Savannah River Operations named 2012 Facility Representative of the Year John C. Barnes of Savannah River Operations named 2012 Facility Representative of the Year August 20, 2013 - 8:27am Addthis John C. Barnes of Savannah River Operations named 2012 Facility Representative of the Year About 200 Department of Energy (DOE) federal employees are Facility Representatives (FR) who provide day-to-day oversight of contractor operations at DOE facilities. Each year the Department presents the FR of the Year Award to recognize superior service. Mr. John C. Barnes from the Savannah River Operations Office was selected from a field of sixteen nominees as the 2012 DOE FR of the Year. He is responsible for operational oversight of key facilities at the Savannah River Site, including the F and

433

A study of Texas rivers with attention to river access and recreational fisheries  

E-Print Network [OSTI]

U e x 1876 TEXAS A&M UNIVERSITY Department of Wildlife & Fisheries Sciences 10001 January 5, 1998 Bob Smith 123 River Boulevard Troutville, TX 12345 Dear Bob: Next week you will receive a request to complete a questionnaire about your... Hall ~ College Station, Texas 77833-2258 ~ (i)09) 835-5777, FAX (409) 8x(5-3786 18 e U x U II TEXAS A&M UNIVERSITY Department of Wildlife & Fisheries Sciences lsts 10001 January 12, 1998 Bob Smith 123 River Boulevard Troutville, TX 12345...

Baker, Troy L

2013-02-22T23:59:59.000Z

434

Independent Activity Report, Washington River Protection Solutions, LLC -  

Broader source: Energy.gov (indexed) [DOE]

Solutions, Solutions, LLC - October 2011 Independent Activity Report, Washington River Protection Solutions, LLC - October 2011 October 2011 Industrial Hygiene Surveillance of the Washington River Protection Solutions, LLC Industrial Hygiene Program Strategy and Implementation of the Hanford Concerns Council Recommendations [HIAR-ORP-2011-10-26] Staff from the U.S. Department of Energy's (DOE) Office of Enforcement and Oversight, within the Office of Health, Safety and Security (HSS), in coordination with the Office of River Protection (ORP), reviewed the status and programmatic health of the Washington River Protection Solutions, LLC (WRPS) industrial hygiene program relative to the Hanford Concerns Council (HCC) Independent Review Panel (IRP) report on Chemical Vapors Industrial

435

The investigation of anomalous magnetization in the Raft River valley,  

Open Energy Info (EERE)

investigation of anomalous magnetization in the Raft River valley, investigation of anomalous magnetization in the Raft River valley, Idaho Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Conference Proceedings: The investigation of anomalous magnetization in the Raft River valley, Idaho Details Activities (1) Areas (1) Regions (0) Abstract: Cassia County Idaho; clastic sediments; economic geology; exploration; geophysical methods; geophysical surveys; geothermal energy; gravel; ground methods; Idaho; isothermal remanent magnetization; magnetic anomalies; magnetic methods; magnetic properties; magnetic susceptibility; magnetization; paleomagnetism; Raft River basin; remanent magnetization; sediments; surveys; United States Author(s): Anderson, L.A.; Mabey, D.R. Published: Abstracts - Society of Exploration Geophysicists International

436

Petrography of late cenozoic sediments, Raft River geothermal field, Idaho  

Open Energy Info (EERE)

of late cenozoic sediments, Raft River geothermal field, Idaho of late cenozoic sediments, Raft River geothermal field, Idaho Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Conference Proceedings: Petrography of late cenozoic sediments, Raft River geothermal field, Idaho Details Activities (1) Areas (1) Regions (0) Abstract: GEOTHERMAL ENERGY; RAFT RIVER VALLEY; GEOTHERMAL FIELDS; PETROGRAPHY; BIOTITE; CALCITE; CLAYS; LIMESTONE; PYRITE; SANDSTONES; SEDIMENTS; SHALES; VOLCANIC ROCKS; ZEOLITES; ALKALINE EARTH METAL COMPOUNDS; CALCIUM CARBONATES; CALCIUM COMPOUNDS; CARBON COMPOUNDS; CARBONATE ROCKS; CARBONATES; CHALCOGENIDES; IDAHO; IGNEOUS ROCKS; INORGANIC ION EXCHANGERS; ION EXCHANGE MATERIALS; IRON COMPOUNDS; IRON SULFIDES; MICA; MINERALS; NORTH AMERICA; ORES; OXYGEN COMPOUNDS; PACIFIC NORTHWEST REGION; PYRITES; ROCKS; SEDIMENTARY ROCKS; SULFIDES; SULFUR COMPOUNDS;

437

Ohio River Greenway Development Commission (Indiana) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Ohio River Greenway Development Commission (Indiana) Ohio River Greenway Development Commission (Indiana) Ohio River Greenway Development Commission (Indiana) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Indiana Program Type Environmental Regulations Siting and Permitting Provider Ohio River Greenway Commission

438

River Basins Advisory Commissions (South Carolina) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

River Basins Advisory Commissions (South Carolina) River Basins Advisory Commissions (South Carolina) River Basins Advisory Commissions (South Carolina) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State South Carolina Program Type Environmental Regulations Provider Catawba Wateree River Basin Advisory Commission

439

Borehole geophysics evaluation of the Raft River geothermal reservoir,  

Open Energy Info (EERE)

reservoir, reservoir, Idaho Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Journal Article: Borehole geophysics evaluation of the Raft River geothermal reservoir, Idaho Details Activities (1) Areas (1) Regions (0) Abstract: GEOTHERMAL ENERGY; GEOTHERMAL FIELDS; GEOPHYSICAL SURVEYS; RAFT RIVER VALLEY; GEOTHERMAL EXPLORATION; BOREHOLES; EVALUATION; HOT-WATER SYSTEMS; IDAHO; MATHEMATICAL MODELS; WELL LOGGING; CAVITIES; EXPLORATION; GEOTHERMAL SYSTEMS; HYDROTHERMAL SYSTEMS; NORTH AMERICA; PACIFIC NORTHWEST REGION; USA Author(s): Applegate, J.K.; Donaldson, P.R.; Hinkley, D.L.; Wallace, T.L. Published: Geophysics, 2/1/1977 Document Number: Unavailable DOI: Unavailable Source: View Original Journal Article Geophysical Method At Raft River Geothermal Area (1977) Raft River Geothermal Area

440

Missouri River Energy Services (23 Member Cooperatives) - Business Energy  

Broader source: Energy.gov (indexed) [DOE]

Missouri River Energy Services (23 Member Cooperatives) - Business Missouri River Energy Services (23 Member Cooperatives) - Business Energy Efficiency Rebate Missouri River Energy Services (23 Member Cooperatives) - Business Energy Efficiency Rebate < Back Eligibility Commercial Savings Category Heating & Cooling Commercial Heating & Cooling Heating Cooling Manufacturing Other Appliances & Electronics Heat Pumps Commercial Lighting Lighting Water Heating Program Info State Minnesota Program Type Utility Rebate Program Rebate Amount Varies by technology Provider Missouri River Energy Solutions Bright Energy Solutions offers energy efficiency cash incentive programs to [http://www.dsireusa.org/incentives/incentive.cfm?Incentive_Code=MN170F&r... residential] and business customers of municipal utilities that are members

Note: This page contains sample records for the topic "river sockeye captive" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Delaware River Basin Commission (Multiple States) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Delaware River Basin Commission (Multiple States) Delaware River Basin Commission (Multiple States) Delaware River Basin Commission (Multiple States) < Back Eligibility Utility Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Installer/Contractor Rural Electric Cooperative Tribal Government Systems Integrator Savings Category Water Buying & Making Electricity Home Weatherization Program Info Start Date 1961 State Delaware Program Type Environmental Regulations Siting and Permitting Provider Project Review Section The Delaware River Basin Commission (DRBC) is a federal-interstate compact government agency that was formed by concurrent legislation enacted in 1961 by the United States and the four basin states (Pennsylvania, New York, New

442

Independent Oversight Review, Savannah River Field Office Tritium  

Broader source: Energy.gov (indexed) [DOE]

Field Office Tritium Field Office Tritium Facilities - November 2013 Independent Oversight Review, Savannah River Field Office Tritium Facilities - November 2013 November 13, 2013 Review of Savannah River Field Office Tritium Facilities Radiological Controls Activity-Level Implementation This report documents the results of an independent oversight review of the radiological protection program at the Savannah River Site (SRS) tritium facilities implemented at the activity-level by Savannah River Nuclear Solutions, LLC and its subcontractors. The review was performed by the Office of Health, Safety and Security's Office of Safety and Emergency Management Evaluations within the broader context of an ongoing program of targeted assessments of radiological control programs, with an emphasis on

443

Workforce Statistics - Savannah River Field Office | National Nuclear  

National Nuclear Security Administration (NNSA)

Savannah River Field Office | National Nuclear Savannah River Field Office | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Workforce Statistics - Savannah River Field Office Home > About Us > Our Operations > Management and Budget > Office of Civil Rights > Workforce Statistics > Workforce Statistics - Savannah River Field

444

Voluntary Protection Program Onsite Review, Savannah River Site- May 2010  

Broader source: Energy.gov [DOE]

Evaluation to determine whether the Savannah River Site is continuing to perform at a level deserving DOE-VPP Star recognition.

445

Independent Oversight Review, Savannah River Site- January 2013  

Broader source: Energy.gov [DOE]

Review of the Savannah River Site, Waste Solidification Building, Construction Quality of Mechanical Systems Installation and Selected Aspects of Fire Protection System Design

446

OUTDOOR RECREATION DEMAND AND EXPENDITURES: LOWER SNAKE RIVER RESERVOIRS  

E-Print Network [OSTI]

i OUTDOOR RECREATION DEMAND AND EXPENDITURES: LOWER SNAKE RIVER RESERVOIRS John R. Mc . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v SECTION ONE - OUTDOOR RECREATION DEMAND . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Recreation Demand Methods

O'Laughlin, Jay

447

Simulation analysis of the unconfined aquifer, Raft River Geothermal...  

Open Energy Info (EERE)

the southern Raft River Valley that includes the known Geothermal Resource Area near Bridge, Idaho, was modelled numerically to evaluate the hydrodynamics of the unconfined...

448

PIA - Savannah River Operations Office Executive Commitment Action...  

Office of Environmental Management (EM)

River Operations Office Executive Commitment Action Tracking System More Documents & Publications PIA - GovTrip (DOE data) PIA - Bonneville Power Adminstration Ethics Helpline...

449

Savannah River Site Achieves Transuranic Waste Disposition Goal...  

Office of Environmental Management (EM)

liquid waste contractor, Savannah River Remediation (SRR): Closed two more underground tanks containing radioactive waste, helping reduce a significant environmental risk to South...

450

U. S. Department of Energy Savannah River Operations Office ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Contracts Contractor Performance DOE Seal U. S. Department of Energy Savannah River Operations Office P. O. Box A Aiken, SC 29802 (803) 952-7697 Site Operator: (803)...

451

FY 2009 Savannah River Nuclear Solutions, LLC, PER Summary |...  

National Nuclear Security Administration (NNSA)

Savannah River Nuclear Solutions, LLC, PER Summary | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing...

452

FY 2008 Washington Savannah River Company, LLC, PER Summary ...  

National Nuclear Security Administration (NNSA)

Washington Savannah River Company, LLC, PER Summary | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing...

453

Species for the screening assessment. Columbia River Comprehensive Impact Assessment  

SciTech Connect (OSTI)

Because of past nuclear production operations along the Columbia River, there is intense public and tribal interest in assessing any residual Hanford Site related contamination along the river from the Hanford Reach to the Pacific Ocean. The Columbia River Comprehensive Impact Assessment was proposed to address these concerns. The assessment of the Columbia River is being conducted in phases. The initial phase is a screening assessment of the risk, which addresses current environmental conditions for a range of potential uses. One component of the screening assessment estimates the risk from contaminants in the Columbia River to the environment. The objective of the ecological risk assessment is to determine whether contaminants from the Columbia River pose a significant threat to selected receptor species that exist in the river and riparian communities of the study area. This report (1) identifies the receptor species selected for the screening assessment of ecological risk and (2) describes the selection process. The species selection process consisted of two tiers. In Tier 1, a master species list was developed that included many plant and animal species known to occur in the aquatic and riparian systems of the Columbia River between Priest Rapids Dam and the Columbia River estuary. This master list was reduced to 368 species that occur in the study area (Priest Rapids Dam to McNary Dam). In Tier 2, the 181 Tier 1 species were qualitatively ranked based on a scoring of their potential exposure and sensitivity to contaminants using a conceptual exposure model for the study area.

Becker, J.M.; Brandt, C.A.; Dauble, D.D.; Maughan, A.D.; O`Neil, T.K.

1996-03-01T23:59:59.000Z

454

Savannah River Technology Center monthly report, January 1994  

SciTech Connect (OSTI)

This is the monthly progress report for the Savannah River Technology Center, which covers the following areas of interest, Tritium, Separation processes, Environmental Issues, and Waste Management.

Not Available

1994-01-01T23:59:59.000Z

455

Light Company Vigilante Electric Cooperative, Inc. Raft River...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Inland Power & Light Company Vigilante Electric Cooperative, Inc. Raft River Rural Electric Cooperative, Inc. Northern Lights, Inc. Lower Valley Energy, Inc. Clearwater Power...

456

Oregon Willamette River Basin Mitigation Agreement | Open Energy...  

Open Energy Info (EERE)

Willamette River Basin Mitigation Agreement Author State of Oregon Recipient Bonneville Power Administration Published Publisher Not Provided, 10222010 DOI Not Provided Check for...

457

EA-1981: Bonneville-Hood River Transmission Line Rebuild, Multnomah...  

Broader source: Energy.gov (indexed) [DOE]

Multnomah and Hood River Counties, Oregon Summary Bonneville Power Administration (BPA) is preparing an EA to assess potential environmental impacts of a proposal to rebuild...

458

COAL QUALITY AND GEOCHEMISTRY, POWDER RIVER BASIN, WYOMING AND MONTANA  

E-Print Network [OSTI]

in the Powder River Basin in Wyoming and Montana (fig. PQ-1) is considered to be "clean coal." For the location

459

U. S. Department of Energy Savannah River Operations Office ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Ronald T. Bartholomew Ronald T. Bartholomew Director - Office of Safeguards, Security and Emergency Services U. S. Department of Energy Savannah River Operations Office Ronald T....

460

American Society of Mechanical Engineers/Savannah River National...  

Broader source: Energy.gov (indexed) [DOE]

for Hydrogen Infrastructure Codes and Standards Workshop and the DOE Hydrogen Pipeline Working Group Workshop Agenda American Society of Mechanical EngineersSavannah River...

Note: This page contains sample records for the topic "river sockeye captive" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Final Technical Resource Confirmation Testing at the Raft River...  

Open Energy Info (EERE)

Resource Confirmation Testing at the Raft River Geothermal Project, Cassia County, Idaho Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Final Technical...

462

Concept Testing and Development at the Raft River Geothermal...  

Broader source: Energy.gov (indexed) [DOE]

3 4.1.2 Concept Testing and Development at the Raft River Geothermal Field, Idaho Presentation Number: 007 Investigator: Moore, Joseph (University of Utah) Objectives: Develop and...

463

Lower Watts Bar Reservoir Clinch River/Poplar Creek  

Broader source: Energy.gov [DOE]

This document explains the cleanup activities and any use limitations for the land surrounding the Lower Watts Bar Reservoir Clinch River/Poplar Creek.

464

Concept Testing and Development at the Raft River Geothermal...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

at the Raft River Geothermal Field, Idaho The Role of Geochemistry and Stress on Fracture Development and Proppant Behavior in EGS Reservoirs Economic Impact Analysis for EGS...

465

Cleaning Up the Hanford River Corridor and Improving Site Operations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

operations * Continue River Corridor cleanup, including remediation of 618-10 Burial Ground * Continue Plutonium Finishing Plant deactivation, decommissioning and demolition *...

466

Independent Oversight Review, Savannah River Site - June 2012...  

Broader source: Energy.gov (indexed) [DOE]

Independent Oversight Review, Savannah River Site - June 2012 June 2012 Review of Electrical System Configuration Management, Safety Instrumented System Commercial Grade...

467

Exploring the Raft River geothermal area, Idaho, with the dc...  

Open Energy Info (EERE)

geothermal area, Idaho, with the dc resistivity method (Abstract) Abstract GEOTHERMAL ENERGY; GEOTHERMAL FIELDS; ELECTRICAL SURVEYS; IDAHO; GEOTHERMAL EXPLORATION; RAFT RIVER...

468

PIA - Savannah River Nuclear Solution (SRNS) MedGate Occupational...  

Office of Environmental Management (EM)

Occupational Health and Safety Medical System (OHS) (Includes the Drug and Alcohol Testing System (Assistant)) PIA - Savannah River Nuclear Solution (SRNS) MedGate...

469

PIA - Savannah River Nuclear Solution (SRNS) Procurement Cycle...  

Energy Savers [EERE]

Occupational Health and Safety Medical System (OHS) (Includes the Drug and Alcohol Testing System (Assistant)) PIA - Savannah River Nuclear Solution (SRNS) Energy Employees...

470

PIA - Savannah River Nuclear Solution (SRNS) Energy Employees...  

Energy Savers [EERE]

Occupational Health and Safety Medical System (OHS) (Includes the Drug and Alcohol Testing System (Assistant)) PIA - Savannah River Nuclear Solution (SRNS) Procurement Cycle...

471

2011 Annual Planning Summary for Savannah River Operations Office (SRS)  

Broader source: Energy.gov [DOE]

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Savannah River Operations Office (SRS) (See also Environmental Management).

472

Re: Potomac River Generating Station Department of Energy, Case...  

Broader source: Energy.gov (indexed) [DOE]

the downtown area of the District of Columbia. Earlier scheduled maintenance on these lines was postponed because of the shutdown of Mirant's Potomac River Generating Plant, but...

473

Elk River Municipal Utilities- Residential Energy Efficiency Rebate Program  

Broader source: Energy.gov [DOE]

[http://www.elkriverutilities.com/index.php Elk River Municipal Utilities] provides rebates to their residential electric customers who purchase and install Energy Star rated appliances and HVAC...

474

American Society of Mechanical Engineers/Savannah River National...  

Broader source: Energy.gov (indexed) [DOE]

American Society of Mechanical EngineersSavannah River National Laboratory (ASMESRNL) Materials and Components for Hydrogen Infrastructure Codes and Standards Workshop and the...

475

2010 Annual Planning Summary for Savannah River Operations Office...  

Energy Savers [EERE]

Savannah River Operations Office (SRS) Annual Planning Summaries briefly describe the status of ongoing NEPA compliance activities, any EAs expected to be prepared in the next 12...

476

Dennis Yates Of Savannah River Operations Named 2013 Facility...  

Office of Environmental Management (EM)

River Site. The HB-Line is part of the H-Canyon, which conducts hazardous nuclear chemistry, packaging, and processing operations on plutonium and transuranic materials. Mr....

477

Department of Energy Cites Savannah River Nuclear Solutions,...  

Energy Savers [EERE]

Solutions, LLC for Worker Safety and Health Violations Department of Energy Cites Savannah River Nuclear Solutions, LLC for Worker Safety and Health Violations November 9, 2012 -...

478

Letter from Commonwealth to Mirant Potomac River Concerning Serious...  

Broader source: Energy.gov (indexed) [DOE]

Standards for Sulfur Dioxide Comments on Department of Energy's Emergency Order To Resume Limited Operation at Mirant's Potomac River Generating Station and Proposed Mirant...

479

Employment Verification at Savannah River Site, INS-O-09-05 ...  

Broader source: Energy.gov (indexed) [DOE]

Employment Verification at Savannah River Site, INS-O-09-05 Employment Verification at Savannah River Site, INS-O-09-05 The Department of Energy's Savannah River Operations Office...

480

E-Print Network 3.0 - area forked river Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

near .Iasper; vValnut Fork of the Piney River... of the White River are the War Eagle, Kings, BUffalo, and Little Red rivers, on the south, and the North Fork... of the Arkansas...

Note: This page contains sample records for the topic "river sockeye captive" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Bayer Material Science (TRL 1 2 3 System) - River Devices to...  

Broader source: Energy.gov (indexed) [DOE]

Bayer Material Science (TRL 1 2 3 System) - River Devices to Recover Energy with Advanced Materials(River DREAM) Bayer Material Science (TRL 1 2 3 System) - River Devices to...

482

Beyond Density: Measuring Neighborhood Form in New England's Upper Connecticut River Valley  

E-Print Network [OSTI]

in New Englands Upper Connecticut River Valley by Peterin New Englands Upper Connecticut River Valley by Peterof New Englands Upper Connecticut River Valley encompassing

Owens, Peter Marshall

2005-01-01T23:59:59.000Z

483

Field container as a regional strategy for revitalizing the Los Angeles River  

E-Print Network [OSTI]

This thesis is the study of the Los Angeles River as a multi-layered field with urban condensers that revitalize the river, connect and revitalize the municipal districts bordering the river, and restructure the region to ...

Ghole, Saba (Saba Ashfaq)

2007-01-01T23:59:59.000Z

484

Impact of Water Resource Development on Coastal Erosion, Brazos River, Texas  

E-Print Network [OSTI]

Major dam and reservoir development within the Brazos River Basin is correlative with a significant decrease in the suspended sediment load of the river and with increased coastal erosion rates near the delta. A hydrologic analysis of the river...

Mathewson, C. C.; Minter, L. L.

485

Biological surveys on the Savannah River in the vicinity of the Savannah River Plant (1951-1976)  

SciTech Connect (OSTI)

In 1951, the Academy of Natural Sciences of Philadelphia was contracted by the Savannah River Plant to initiate a long-term monitoring program in the Savannah River. The purpose of this program was to determine the effect of the Savannah River Plant on the Savannah River aquatic ecosystem. The data from this monitoring program have been computerized by the Savannah River Laboratory, and are summarized in this report. During the period from 1951-1976, 16 major surveys were conducted by the Academy in the Savannah River. Water chemistry analyses were made, and all major biological communities were sampled qualitatively during the spring and fall of each survey year. In addition, quantitative diatom data have been collected quarterly since 1953. Major changes in the Savannah River basin, in the Savannah River Plant's activities, and in the Academy sampling patterns are discussed to provide a historical overview of the biomonitoring program. Appendices include a complete taxonomic listing of species collected from the Savannah River, and summaries of the entire biological and physicochemical data base.

Matthews, R. A.

1982-04-01T23:59:59.000Z

486

A study to determine the feasibility of diverting a portion of the Red River into the Trinity, Neches and Sabine River basins  

E-Print Network [OSTI]

outlook ~Pt t 1 Trinity River Basin EconoInic outlook ~Pt t 1 Neches River Basin 10 10 Economic outlook 10 ~Pt t 1 Sabine River Basin Economic outlook 12 I I I. THE WATER RESOURCES DF THE NECHES AND RED RIVER BASINS 14 Neches River Basin 14.... Municipal and Industrial Water Requirements Page 13 LIST OF FIGURES Figure Page I- 1. State of Texas 2-1. Population Projection and Municipal and Industrial Water Requirements 3-1. Neches River Basin Reservoirs 19 3-2. Low Flow Events, Neches River...

Cook, John Henry

2012-06-07T23:59:59.000Z

487

Savannah River Site environmental report for 1988  

SciTech Connect (OSTI)

This volume of Savannah River Site Environmental report for 1988 (WSRC-RP-89-59-1) contains the figures and tables referenced in Volume 1. The figures contain graphic illustrations of sample locations and/or data. The tables contain summaries of the following types of data: Federal and State standards and guides applicable to SRS operations; concentrations of radioactivity in environmental media; the quantity of radioactivity released to the environment from SRS operations; offsite radiation dose commitments from SRS operations; measurements of physical properties, chemicals, and metals concentrations in environmental media; and interlaboratory comparison of analytical results.

Cummins, C.L.; Hetrick, C.S.; Stevenson, D.A. (eds.); Davis, H.A.; Martin, D.K.; Todd, J.L.

1989-01-01T23:59:59.000Z

488

Raft river geothermal pump disassembly and inspection  

SciTech Connect (OSTI)

The disassembly and postoperation inspection of the Peerless geothermal water pump used in teh RRGE-1 well at the Raft River Geothermal Test Site are summarized. Disassembly was hampered by scale that froze some of the pump bearings onto the impeller shaft after operation ceased. The pump appeared otherwise in generally excellent condition after more than 1600 h running time in a geothermal environment. Most postoperation diameters of rotating parts were still within factory tolerance. The few out-of-tolerance bearing diameters could not be attributed to wear and could have been out of tolerance when received. This possibility points to a need for preoperation quality-control inspection of the bearings.

Van Treeck, R.

1983-02-01T23:59:59.000Z

489

Salt River Project electric vehicle program  

SciTech Connect (OSTI)

Electric vehicles (EV) promise to be a driving force in the future of America. The quest for cleaner air and efforts to trim the nation's appetite for foreign oil are among the reasons why. America's EV future is rapidly approaching, with major automakers targeting EV mass production and sales before the end of the decade. This article describes the Salt River Project (SRP), a leader among electric utilities involved in EV research and development (R and D). R and D efforts are underway to plan and prepare for a significant number of EVs in SRP's service territory and to understand the associated recharging requirements for EVs.

Morrow, K.P.

1994-11-01T23:59:59.000Z

490

Meteorological Support at the Savanna River Site  

SciTech Connect (OSTI)

The Department of Energy (DOE) operates many nuclear facilities on large complexes across the United States in support of national defense. The operation of these many and varied facilities and processes require meteorological support for many purposes, including: for routine operations, to respond to severe weather events, such as lightning, tornadoes and hurricanes, to support the emergency response functions in the event of a release of materials to the environment, for engineering baseline and safety documentation, as well as hazards assessments etc. This paper describes a program of meteorological support to the Savannah River Site, a DOE complex located in South Carolina.

Addis, Robert P.

2005-10-14T23:59:59.000Z

491

Delta Flow Factors Influencing Stray Rate of Escaping Adult San Joaquin River Fall-Run Chinook Salmon (Oncorhynchus tshawytscha)  

E-Print Network [OSTI]

River, and the Golden Gate Bridge (GGB). Example releaseRiver, westward to the Golden Gate Bridge (Figure 1). Delta

2012-01-01T23:59:59.000Z

492

Preliminary Notice of Violation, Savannah River Nuclear Solutions, LLC- WEA-2012-04  

Broader source: Energy.gov [DOE]

Issued to Savannah River Nuclear Solutions (SRNS), LLC, related to a Worker Fall from a Scaffold in the K-Area Complex at the Savannah River Site.

493

Savannah River Technology Center Quarterly Report - July, Aug., and Sept., 1997  

SciTech Connect (OSTI)

This monthly report summarizes programs and accomplishments of the Savannah River Technology Center in support of activities at the Savannah River Site.

Ferrell, J.M.

1998-10-16T23:59:59.000Z

494

The Savannah River Site is owned by the U.S. Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Eloy Saldivar, Jr. Acting Director, Business and Workforce Management Savannah River National Laboratory Savannah River Nuclear Solutions, LLC Texas A&M University Bachelor of...

495

Preliminary Notice of Violation, Westinghouse Savannah River Company- EA-2002-01  

Broader source: Energy.gov [DOE]

Issued to Westinghouse Savannah River Company related to Safety Basis and Radiation Protection Violations at the Savannah River Site, March 19, 2002 (EA-2002-01)

496

SALINITY MANAGEMENT IN THE UPPER COLORADO RIVER BASIN: MODELING, MONITORING, AND COST-EQUITY CHALLENGES.  

E-Print Network [OSTI]

?? Salinity issues in the Upper Colorado River Basin have been a serious concern to the western United States and northern Mexico. The Colorado River (more)

Keum, Jongho

2014-01-01T23:59:59.000Z

497

The Savannah River Site is owned by the U.S. Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Steven Wach Strategic Development and Technical Partnerships Savannah River National Laboratory Savannah River Nuclear Solutions, LLC Georgia Institute of Technology Bachelor of...

498

The Savannah River Site is owned by the U.S. Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Terry A. Michalske, PhD Executive Vice President and Director, Savannah River National Laboratory Savannah River Nuclear Solutions, LLC Alfred University PhD, Ceramic Science...

499

Preliminary Notice of Violation, Savannah River Nuclear Solutions, LLC- WEA-2010-05  

Broader source: Energy.gov [DOE]

Issued to Savannah River Nuclear Solutions, LLC related to a Nitric Acid Spill Event and an Electrical Arc Flash Injury Event at the Savannah River Site

500

Preliminary Notice of Violation, Westinghouse Savannah River Company- EA 98-09  

Broader source: Energy.gov [DOE]

Preliminary Notice of Violation issued to Westinghouse Savannah River Company, related to Bioassay Program Deficiencies at the Savannah River Site, (EA-98-09)

First Page Previous Page 1 2 3 4 5 6 7 8 9