National Library of Energy BETA

Sample records for river power authority

  1. Platte River Power Authority | Open Energy Information

    Open Energy Info (EERE)

    search Name: Platte River Power Authority Place: Colorado Website: www.prpa.org Facebook: https:www.facebook.comPlatteRiverPower Outage Hotline: 1-888-748-5113 References:...

  2. Lower Colorado River Authority | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Lower Colorado River Authority's communications requirements Lower Colorado River Authority (134.07

  3. Lower Colorado River Authority | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    from Lower Colorado River Authority on Smart Grid communications requirements Lower Colorado River Authority (349.31

  4. Grand River Dam Authority | Open Energy Information

    Open Energy Info (EERE)

    River Dam Authority Place: Oklahoma Phone Number: 918-256-5545 Website: www.grda.com Twitter: @okgrda Facebook: https:www.facebook.compagesGrand-River-Dam-Authority...

  5. U.S. Department of Energy electric and hybrid vehicle Site Operator Program at Platte River Power Authority. Final report, July 3, 1991--August 31, 1996

    SciTech Connect (OSTI)

    Emmert, R.A.

    1996-12-31

    The Platte River Power Authority (Platte River) is a political subdivision of the state of Colorado, owned by the four municipalities of Fort Collins, Loveland, Longmont and Estes Park, Colorado. Platte River is a non-profit, publicly owned, joint-action agency formed to construct, operate and maintain generating plants, transmission systems and related facilities for the purpose of delivering to the four municipalities electric energy for distribution and resale. Platte River, as a participant in the US Department of Energy (DOE) Site Operator Program, worked to accomplish the Site Operator Program goals and objectives to field test and evaluate electric and electric-hybrid vehicles and electric vehicle systems in a real world application/environment. This report presents results of Platte River`s program (Program) during the five-years Platte River participated in the DOE Site Operator Program. Platte River participated in DOE Site Operator Program from July 3, 1991 through August 31, 1996. During its Program, Platte River conducted vehicle tests and evaluations, and electric vehicle demonstrations in the Front Range region of Northern Colorado. Platte River also investigated electric vehicle infrastructure issues and tested infrastructure components. Platte River`s Program objectives were as follows: evaluate the year round performance, operational costs, reliability, and life cycle costs of electric vehicles in the Front Range region of Northern Colorado; evaluate an electric vehicle`s usability and acceptability as a pool vehicle; test any design improvements or technological improvements on a component level that may be made available to PRPA and which can be retrofit into vehicles; and develop, test and evaluate, and demonstrate components to be used in charging electric vehicles.

  6. River of Power (1987)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Volume One Film Collection Volume Two 75th Anniversary Hydropower in the Northwest Woody Guthrie Videos Strategic Direction Branding & Logos Power of the River History Book...

  7. Brazos River Authority | Open Energy Information

    Open Energy Info (EERE)

    Place: Texas Phone Number: 1-888-922-6272 Website: www.brazos.org Facebook: https:www.facebook.compagesBrazos-River-Authority126719790675809?frefts Outage Hotline:...

  8. Lower Colorado River Authority | Open Energy Information

    Open Energy Info (EERE)

    Name: Lower Colorado River Authority Place: Texas Website: www.lcra.orgPagesdefault.asp Twitter: @lcra Facebook: https:www.facebook.comlowercoloradoriverauthority Outage...

  9. Dine Power Authority (DPA)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Use state-of-the-art technology, Highly efficient, environmentally-friendly, coal-fired power plant which meets applicable regulatory standards Efficient and optimum use of ...

  10. Silicon Valley Power and Oklahoma Municipal Power Authority Win...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Silicon Valley Power and Oklahoma Municipal Power Authority Win 2014 Public Power Wind Awards Silicon Valley Power and Oklahoma Municipal Power Authority Win 2014 Public Power Wind ...

  11. Comments of the Lower Colorado River Authority | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lower Colorado River Authority Comments of the Lower Colorado River Authority Comments of the Lower Colorado River Authority on Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy Comments of the Lower Colorado River Authority (54.12 KB) More Documents & Publications Lower Colorado River Authority Lower Colorado River Authority NBP RFI: Communications Requirements- Comments of Meeker Cooperative Light

  12. Western Area Power Administration Borrowing Authority, Recovery...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Western Area Power Administration Borrowing Authority, Recovery Act Western Area Power Administration Borrowing Authority, Recovery Act PDF icon Microsoft Word - PSRP May 15 2009 ...

  13. Guam Power Authority | Open Energy Information

    Open Energy Info (EERE)

    Power Authority Jump to: navigation, search Name: Guam Power Authority Place: Hagatna, GU References: EIA Form EIA-861 Final Data File for 2010 - File1a1 SGIC2 EIA Form 861...

  14. American Samoa Power Authority | Open Energy Information

    Open Energy Info (EERE)

    Samoa Power Authority Jump to: navigation, search Name: American Samoa Power Authority Place: American Samoa References: EIA Form EIA-861 Final Data File for 2010 - File1a1 EIA...

  15. Texas River Authority Website Links | Open Energy Information

    Open Energy Info (EERE)

    Legal Document- OtherOther: Texas River Authority Website LinksLegal Abstract The Texas Parks and Wildlife Department provides information on and links to each of the 23 river...

  16. PP-369 British Columbia Hydro and Power Authority | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PP-369 British Columbia Hydro and Power Authority PP-369 British Columbia Hydro and Power Authority Presidential Permit authorizing British Columbia and Power Authority to...

  17. Long Island Power Authority Solar Project | Open Energy Information

    Open Energy Info (EERE)

    Long Island Power Authority Solar Project Jump to: navigation, search Name Long Island Power Authority Solar Project Facility Long Island Power Authority Solar Project Sector Solar...

  18. Arizona Power Authority | Open Energy Information

    Open Energy Info (EERE)

    Arizona Power Authority Place: Arizona Phone Number: 602-368-4265 Website: www.powerauthority.org Outage Hotline: 602-368-4265 References: EIA Form EIA-861 Final Data File for...

  19. Silicon Valley Power and Oklahoma Municipal Power Authority Win 2014 Public Power Wind Awards

    Broader source: Energy.gov [DOE]

    The Energy Department and the American Public Power Association named Oklahoma Municipal Power Authority and Silicon Valley Power as the winners of the 2014 Public Power Wind Awards.

  20. Power of the River History Book

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Power-of-the-River-BPA-History-Book Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects &...

  1. Brochure: Federal Columbia River Power System (FCRPS)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    these agencies maximize the use of the Columbia River by generating power, protecting fish and wildlife, controlling floods, providing irrigation and navigation, and sustaining...

  2. ONSITE TRANSPORTATION AUTHORIZATION CHALLENGES AT THE SAVANNAH RIVER SITE

    SciTech Connect (OSTI)

    Watkins, R.; Loftin, B.; Hoang, D.; Maxted, M.

    2012-05-30

    Prior to 2008, transfers of radioactive material within the Savannah River Site (SRS) boundary, referred to as onsite transfers, were authorized by Transportation Safety Basis (TSB) documents that only required approval by the SRS contractor. This practice was in accordance with the existing SRS Transportation Safety Document (TSD). In 2008 the Department of Energy Savannah River Field Office (DOE-SR) requested that the SRS TSD be revised to require DOE-SR approval of all Transportation Safety Basis (TSB) documents. As a result, the primary SRS contractor embarked on a multi-year campaign to consolidate old or generate new TSB documents and obtain DOE-SR approval for each. This paper focuses on the challenges incurred during the rewriting or writing of and obtaining DOE-SR approval of all Savannah River Site Onsite Transportation Safety Basis documents.

  3. Yingjiang County Binglang River Hydroelectric Power Co Ltd |...

    Open Energy Info (EERE)

    Yingjiang County Binglang River Hydroelectric Power Co Ltd Jump to: navigation, search Name: Yingjiang County Binglang River Hydroelectric Power Co., Ltd. Place: Dehong Dai-Jingpo...

  4. Jichuan Taiyang River Hydro Power Development Co Ltd | Open Energy...

    Open Energy Info (EERE)

    Jichuan Taiyang River Hydro Power Development Co Ltd Jump to: navigation, search Name: Jichuan Taiyang River Hydro Power Development Co., Ltd. Place: Sichuan Province, China Zip:...

  5. Yunnan Daoyao County Duodi River Hydro Power Development Co Ltd...

    Open Energy Info (EERE)

    Daoyao County Duodi River Hydro Power Development Co Ltd Jump to: navigation, search Name: Yunnan Daoyao County Duodi River Hydro Power Development Co., Ltd. Place: Yunnan...

  6. Gansu Diantou Tao River Hydro Power Development Co Ltd | Open...

    Open Energy Info (EERE)

    River Hydro Power Development Co Ltd Jump to: navigation, search Name: Gansu Diantou Tao River Hydro Power Development Co. Ltd. Place: Lanzhou, Gansu Province, China Zip: 730030...

  7. Kings River Conservation District (KRCD) Solar Farm Solar Power...

    Open Energy Info (EERE)

    River Conservation District (KRCD) Solar Farm Solar Power Plant Jump to: navigation, search Name Kings River Conservation District (KRCD) Solar Farm Solar Power Plant Facility...

  8. Gengma County Tiechang River Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Gengma County Tiechang River Power Plant Jump to: navigation, search Name: Gengma County Tiechang River Power Plant Place: Lincang City, Yunnan Province, China Zip: 666100 Sector:...

  9. Zijin County East River Fengguang Likou Power Plant Development...

    Open Energy Info (EERE)

    Zijin County East River Fengguang Likou Power Plant Development Co Ltd Jump to: navigation, search Name: Zijin County East River Fengguang Likou Power Plant Development Co.Ltd...

  10. PP-56- Power Authority of the State of New York

    Broader source: Energy.gov [DOE]

    Presidential Permit authorizing Power Authority of the State of New York to construct, operate, and maintain electric transmission facilities at the U.S. - Canada Border.

  11. PP-22 British Columbia Hydro and Power Authority, Amendment 1967

    Broader source: Energy.gov [DOE]

    Presidential permit authorizing British Columbia Hydro and Power Authority to construct, operate, and maintain electric transmision facilities at the U.S-Canadian border.

  12. PP-369 British Columbia Hydro and Power Authority

    Broader source: Energy.gov [DOE]

    Presidential Permit authorizing British Columbia and Power Authority to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

  13. PP-30 New York Power Authority | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    New York Power Authority to construct, operate, and maintain electric transmissionf facilities at the U.S-Canada border. PDF icon PP-30 New York Power Authority More Documents & ...

  14. Long Island Power Authority | Open Energy Information

    Open Energy Info (EERE)

    Blvd Place: Uniondale, New York Zip: 11553 Region: Northeast - NY NJ CT PA Area Sector: Services Product: Green Power Marketer Website: www.lipower.org References: EIA Form...

  15. Smith River Rancheria - Wind and Biomass Power Generation Facility...

    Broader source: Energy.gov (indexed) [DOE]

    Greg Retzlaff Strategic Energy Solutions, Inc. Wind & Biomass Power Generation Smith River Rancheria 2 Smith River Rancheria * Coastal Community of 600 in Northern California and ...

  16. Smith River Rancheria - Wind and Biomass Power Generation Feasibility...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Greg Retzlaff Strategic Energy Solutions, Inc. Wind & Biomass Power Generation Smith River Rancheria 2 Smith River Rancheria * Coastal Community of 600 * Members Living in Oregon * ...

  17. Power Generation for River and Tidal Generators

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Power Generation for River and Tidal Generators Eduard Muljadi, Alan Wright, and Vahan Gevorgian National Renewable Energy Laboratory James Donegan, Cian Marnagh, and Jarlath McEntee Ocean Renewable Power Company Technical Report NREL/TP-5D00-66097 June 2016 NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency & Renewable Energy Operated by the Alliance for Sustainable Energy, LLC This report is available at no cost from the National Renewable Energy

  18. Oklahoma Municipal Power Authority- Commercial and Industrial Energy Efficiency Program

    Broader source: Energy.gov [DOE]

    The Oklahoma Municipal Power Authority (OMPA) offers the Demand and Energy Efficiency Program (DEEP) to eligible commercial, industrial, and municipal government customers served by OMPA. This...

  19. Oklahoma Municipal Power Authority- WISE Residential Energy Efficiency Rebate Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Oklahoma Municipal Power Authority (OMPA) offers residential customers rebates on a variety of HVAC equipment through its WISE Rebate program. This program encourages residential customers and...

  20. New River Geothermal Exploration (Ram Power Inc.)

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Miller, Clay

    The New River Geothermal Exploration (DOE Award No. EE0002843) is located approximately 25km south of the Salton Sea, near town of Brawley in Imperial County and approximately 150km east of San Diego, California. A total of 182 MT Logger sites were completed covering the two separate Mesquite and New River grids. The data was collected over a frequency range of 320Hz to 0.001Hz with variable site spacing. A number of different inversion algorithms in 1D, 2D and 3D were used to produce resistivity-depth profiles and maps of subsurface resistivity variations over the survey area. For 2D inversions, a total of eighteen lines were constructed in east-west and north-south orientations crossing the entire survey area. For MT 3D inversion, the New River property was divided in two sub-grids, Mesquite and New River areas. The report comprises of two parts. For the first part, inversions and geophysical interpretation results are presented with some recommendations of the potential targets for future follow up on the property. The second part of the report describes logistics of the survey, survey parameters, methodology and the survey results (data) in digital documents. The report reviews a Spartan MT survey carried out by Quantec Geoscience Limited over the New River Project in California, USA on behalf of Ram Power Inc. Data was acquired over a period of 29 days from 2010/06/26 to 2010/07/24.

  1. New River Geothermal Exploration (Ram Power Inc.)

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Miller, Clay

    2013-11-15

    The New River Geothermal Exploration (DOE Award No. EE0002843) is located approximately 25km south of the Salton Sea, near town of Brawley in Imperial County and approximately 150km east of San Diego, California. A total of 182 MT Logger sites were completed covering the two separate Mesquite and New River grids. The data was collected over a frequency range of 320Hz to 0.001Hz with variable site spacing. A number of different inversion algorithms in 1D, 2D and 3D were used to produce resistivity-depth profiles and maps of subsurface resistivity variations over the survey area. For 2D inversions, a total of eighteen lines were constructed in east-west and north-south orientations crossing the entire survey area. For MT 3D inversion, the New River property was divided in two sub-grids, Mesquite and New River areas. The report comprises of two parts. For the first part, inversions and geophysical interpretation results are presented with some recommendations of the potential targets for future follow up on the property. The second part of the report describes logistics of the survey, survey parameters, methodology and the survey results (data) in digital documents. The report reviews a Spartan MT survey carried out by Quantec Geoscience Limited over the New River Project in California, USA on behalf of Ram Power Inc. Data was acquired over a period of 29 days from 2010/06/26 to 2010/07/24.

  2. Workplace Charging Challenge Partner: New York Power Authority...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    In 2013, as part of the Power Authority's workplace charging pilot program, NYPA has installed three charging stations strictly for employee use at the main office in White Plains, ...

  3. Oklahoma Municipal Power Authority- WISE Energy Efficiency Loan Program

    Broader source: Energy.gov [DOE]

    The Oklahoma Municipal Power Authority (OMPA) offers loans for a variety of measures and equipment through its "Ways I Save Electricity" (WISE) Loan Program. This program encourages residential and...

  4. New York Power Authority- Energy Services Programs for Public Entities

    Broader source: Energy.gov [DOE]

    New York Power Authority (NYPA) provides energy efficiency improvements to eligible public sector organizations at no up-front cost. A range of energy efficient upgrades are available through Ene...

  5. Oklahoma Municipal Power Authority- WISE Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    The Oklahoma Municipal Power Authority (OMPA) offers rebates on a variety of HVAC equipment through its WISE Rebate program. This program encourages residential customers and builders to upgrade to...

  6. Singing River Electric Power Association- Comfort Advantage Home Program

    Broader source: Energy.gov [DOE]

    Singing River Electric Power Association provides rebates on energy efficiency measures in new homes and heat pumps that meet Comfort Advantage weatherization standards. To qualify for this rebate...

  7. PP-25 Power Authority of the State of New York and Long Sault...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 Power Authority of the State of New York and Long Sault Inc PP-25 Power Authority of the State of New York and Long Sault Inc Presidential permit authorizing Power Authority of ...

  8. Yun County Pan River Metal Electric Power Co Ltd | Open Energy...

    Open Energy Info (EERE)

    River Metal Electric Power Co Ltd Jump to: navigation, search Name: Yun County Pan River Metal Electric Power Co., Ltd Place: Lincang City, Yunnan Province, China Zip: 675803...

  9. Office of River Protection Scientist Helps Author Cover Story on Glass

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Study | Department of Energy Scientist Helps Author Cover Story on Glass Study Office of River Protection Scientist Helps Author Cover Story on Glass Study May 16, 2016 - 12:05pm Addthis A cover story on EM’s ancient glass study appeared in the American Ceramic Society Bulletin. A cover story on EM's ancient glass study appeared in the American Ceramic Society Bulletin. RICHLAND, Wash. - An EM Office of River Protection (ORP) scientist contributed to an in-depth cover story for an

  10. Qiaojia River Power Co Ltd Li County | Open Energy Information

    Open Energy Info (EERE)

    Changde City, Hainan Province, China Zip: 415500 Sector: Hydro Product: Hunan-based small hydro developer. References: Qiaojia River Power Co., Ltd, Li County1 This article is a...

  11. New River Light & Power Co | Open Energy Information

    Open Energy Info (EERE)

    Co Jump to: navigation, search Name: New River Light & Power Co Place: North Carolina Phone Number: (828) 264-8621 Website: nrlp.appstate.edu Outage Hotline: (828) 264-8621...

  12. Categorical Exclusion Determinations: Western Area Power Administration-Colorado River Storage Project Management Center

    Broader source: Energy.gov [DOE]

    Categorical Exclusion Determinations issued by Western Area Power Administration-Colorado River Storage Project Management Center.

  13. U. 5. COLUMBIA RIVER POWER SYS1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Bonneville Power Administration deposited 12,800,000 to the reclamation fund in the United States Treasury for the account of Columbia Basin Project, Yakima Project...

  14. Power Authority of the State of New York Smart Grid Demonstration...

    Open Energy Info (EERE)

    Authority of the State of New York Smart Grid Demonstration Project Jump to: navigation, search Project Lead Power Authority of the State of New York Country United States...

  15. PP-74 The Power Authority of the State of New York | Department...

    Broader source: Energy.gov (indexed) [DOE]

    The Power Authority of the State of New York to construct, operate, and maintain electric transmission facilities at the U.S. - Canada Border. PDF icon PP-74 The Power Authority of ...

  16. PP-70 The Power Authority of the State of New York | Department...

    Broader source: Energy.gov (indexed) [DOE]

    authorizing The Power Authority of the State of New York to construct, operate, and maintain electric transmission facilities at the U.S. - Canada Border. PDF icon PP-70 The Power ...

  17. DOE's Use of Federal Power Act Emergency Authority | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    On December 14, 2000, a Federal Power Act section 202(c) emergency order was issued in response to the California energy crisis. On August 16, 2002, due to concerns regarding the ...

  18. Diné Power Authority - Navajo Transmission Project and other...

    Broader source: Energy.gov (indexed) [DOE]

    ... DREP 2004 Air Permit Application 0.06 Air Permit * Desert Rock submitted an application with the lowest emission rates for any pulverized coal fired power plant in the US to ...

  19. (Bradfield Electric and Alaska Power Authority Presidential permit): Finding of no significant impact (FONSI)

    SciTech Connect (OSTI)

    Not Available

    1988-01-01

    The Economic Regulatory Administration (ERA) of the Department of Energy (DOE) is considering an application by Bradfield Electric, Inc. (Bradfield), and the Alaska Power Authority (APA) for a Presidential permit to construct, operate, maintain and connect a 69-kilovolt (kV) transmission line which would extend from the APA's Tyee Lake Hydroelectric Power Project located near Wrangell, Alaska, to a point on the US-Canadian international border just east of the South Fork Craig River. The DOE has reviewed an environmental assessment (EA) prepared by the US Forest Service (USFS) in connection with its issuance of a special use permit to construct the proposed line through the Tongass National Forest. Based on this EA, the USFS issued a decision notice and a finding of no significant impact (FONSI) for the proposed project on May 9, 1988. The DOE is adopting this EA as DOE/EA-0375 in partial satisfaction of its responsibilities under the National Environmental Policy Act of 1969 (NEPA) regarding the issuance of a Presidential permit.

  20. EERE Success Story-Tapping the Power of Alaska's Rivers | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Tapping the Power of Alaska's Rivers EERE Success Story-Tapping the Power of Alaska's Rivers April 10, 2013 - 2:06pm Addthis Partnering with Alaska's Whitestone Power, EERE is supporting efforts to develop a practical River In-Stream Energy Conversion (RISEC)-a device that can produce electricity from free-flowing rivers not suited to conventional hydroelectric generation, and that can do so in Alaska's weather conditions. Rural areas of Alaska frequently experience high electricity

  1. AUTHORIZING THE DOT SPECIFICATION 6M PACKAGING FOR CONTINUED USE AT THE SAVANNAH RIVER SITE

    SciTech Connect (OSTI)

    Watkins, R.; Loftin, B.; Hoang, D.

    2010-03-04

    The U.S. Department of Transportation (DOT) Specification 6M packaging was in extensive use for more than 40 years for in-commerce shipments of Type B quantities of fissile and radioactive material (RAM) across the USA, among the Department of Energy (DOE) laboratories, and between facilities in the DOE production complex. In January 2004, the DOT Research and Special Programs Administration (RSPA) Agency issued a final rule in the Federal Register to ammend requirements in the Hazardous Materials Regulations (HMR) pertaining to the transportation of radioactive materials. The final rule became effective on October 1, 2004. One of those changes discontinued the use of the DOT specification 6M, along with other DOT specification packagings, on October 1, 2008. A main driver for the change was due to the fact that 6M specification packagings were not supported by a Safety Analysis Report for Packagings (SARP) that was compliant with Title 10 of the Code of Federal Regulations (CFR) Part 71 (10 CFR 71). The regulatory rules for the discontinued use have been edited in Title 49 of the CFR Parts 100-185, 2004 edition and thereafter. Prior to October 1, 2008, the use of the 6M within the boundaries of the Savannah River Site (SRS), called an onsite transfer, was governed by an onsite transportation document that referenced 49 CFR Parts 100-185. SRS had to develop an Onsite Safety Assessment (OSA) which was independent of 49 CFR in order to justify the continued use of the DOT Specification 6M for the transfer of radioactive material (RAM) at the SRS after October 1, 2008. This paper will discuss the methodology for and difficulties associated with authorizing the DOT Specification 6M Packaging for continued use at the Savannah River Site.

  2. Pearl River Valley Electric Power Association- Residential Energy Efficiency Rebate Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    Pearl River Valley Electric Power Association provides incentives through its Comfort Advantage Program to encourage energy efficiency within the residential sector. Rebates are available for heat...

  3. Microsoft PowerPoint - Allison - Savannah River Presentation

    Office of Environmental Management (EM)

    September 30, 2009 September 30, 2009 JEFFREY M. ALLISON, MANAGER JEFFREY M. ALLISON, MANAGER Savannah River Operations Office Savannah River Operations Office The State of ...

  4. New York Power Authority/New York City Housing Authority refrigerator replacement program, first program year evaluation. Final report

    SciTech Connect (OSTI)

    Kinney, L.F.; Lewis, G.; Pratt, R.G.; Miller, J.

    1997-08-01

    Acting as an energy services provider, the New York Power Authority (NYPA) has initiated a long-term project through which 20,000 refrigerators per year will be replaced with the most energy-efficient units possible in apartments managed by the New York City Housing Authority (NYCHA). Using bulk purchasing as an incentive to appliance manufacturers to produce energy-efficient refrigerators suitable for use in apartments, replaced in the first year of the program, which ended in December 1996. These units, kWh per year. Savings were determined by field testing and laboratory testing of 220 existing refrigerators and 56 newly-installed units. In the next program year, a 15.0-cubic-foot Maytag refrigerator, newly-designed in response to bulk purchasing incentives, is being installed. The new unit has a label rating of 437 kWh per year, 31 percent better than 1993 energy standards. Old refrigerators removed from apartments are {open_quotes}demanufactured{close_quotes} in an environmentally-appropriate way and both metals and refrigerants are recovered for reuse.

  5. Smith River Rancheria - Wind and Biomass Power Generation Facility...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ed Wait Smith River Rancheria Feasibility Striving to build a healthy, self-reliant rural Indian economy for the benefit of Smith River Rancheria members and visitors. Working to ...

  6. REQUEST FOR RECORDS DISPOSITION AUTHORITY | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nuclear Power Plant Docket Records PDF icon REQUEST FOR RECORDS DISPOSITION AUTHORITY More Documents & Publications PIA - Savannah River Remediation Accreditation Boundary (SRR AB) ...

  7. The New York Power Authority`s energy-efficient refrigerator program for the New York City Housing Authority -- 1997 savings evaluation

    SciTech Connect (OSTI)

    Pratt, R.G.; Miller, J.D.

    1998-09-01

    This document describes the estimation of the annual energy savings achieved from the replacement of 20,000 refrigerators in New York City Housing Authority (NYCHA) public housing with new, highly energy-efficient models in 1997. The US Department of Housing and Urban Development (HUD) pays NYCHA`s electricity bills, and agreed to reimburse NYCHA for the cost of the refrigerator installations. Energy savings over the lifetime of the refrigerators accrue to HUD. Savings were demonstrated by a metering project and are the subject of the analysis reported here. The New York Power Authority (NYPA) identified the refrigerator with the lowest life-cycle cost, including energy consumption over its expected lifetime, through a request for proposals (RFP) issued to manufacturers for a bulk purchase of 20,000 units in 1997. The procurement was won by Maytag with a 15-ft{sup 3} top-freezer automatic-defrost refrigerator rated at 437 kilowatt-hours/year (kWh/yr). NYCHA then contracted with NYPA to purchase, finance, and install the new refrigerators, and demanufacture and recycle materials from the replaced units. The US Department of Energy (DOE) helped develop and plan the project through the ENERGY STAR{reg_sign} Partnerships program conducted by its Pacific Northwest National Laboratory (PNNL). PNNL designed the metering protocol and occupant survey used in 1997, supplied and calibrated the metering equipment, and managed and analyzed the data collected by NYPA. The objective of the 1997 metering study was to achieve a general understanding of savings as a function of refrigerator label ratings, occupant effects, indoor and compartment temperatures, and characteristics (such as size, defrost features, and vintage). The data collected in 1997 was used to construct models of refrigerator energy consumption as a function of key refrigerator and occupant characteristics.

  8. Tapping the Power of Alaska's Rivers | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (RISEC)-a device that can produce electricity from free-flowing rivers not suited to conventional hydroelectric generation, and that can do so in Alaska's weather conditions. ...

  9. Microsoft PowerPoint - Arkansa River System Operation.ppt

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Control * * Navigation Navigation * * Hydroelectric Power Hydroelectric Power * * Water ... surcharge surcharge Navigation lock and dams Navigation lock and dams Navigation lock ...

  10. Application for Presidential Permit OE Docket No. PP-369 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority

    Broader source: Energy.gov [DOE]

    Application from British Columbia Transmission Corporation and British Columbia Hydro and Power Authority to construct, operate, and maintain electric transmission facilities at the U.S. - Canada...

  11. Health hazard evaluation report HETA-95-0393-2633, Clinch River Power Plant, Cleveland, Virginia

    SciTech Connect (OSTI)

    Mattorano, D.A.

    1997-05-01

    In response to a request fromm the Building and Construction Trades Department oof the AFL-CIO, an investigation was begun into possible exposures during rebuilding of coal fired boilers at the Clinch River Power Plant (SIC-4911), Cleveland, Virginia. During the sampling period, boilermakers removed secondary inlet and secondary outlet boiler elements and removed and replaced portions of the steel boiler casting, exposing them to fly ash and fumes from air arc gouging, welding, and torch cutting. Laborers maintained the walkways and prepared work areas using sweeping and vacuuming techniques, primarily exposing them to fly ash. The highest personal breathing zone (PBZ) air sample concentrations of arsenic, beryllium, cadmium, nickel, lead, and respirable dust occurred when boilermakers performed job tasks inside the boiler and outside the boiler on the steel boiler casing. Air arc gouging, welding, oxyacetylene torch cutting, or grinding on or near the scale greatly increased the potential for the generation of airborne particles. Cristobalite was found in one PBZ sampel at 0.03mg/m3. The author concludes that there appears to be a potential for a health hazard at job sites where similar activities take place. The author recommends lowering worker exposures through the use of engineering controls and improvements in housekeeping procedures.

  12. Loveland Water & Power- Commercial and Industrial Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    Loveland Water & Power, in conjunction with the Platte River Power Authority provides businesses incentives for new construction projects and existing building retrofits. The Electric...

  13. Longmont Power & Communications- Commercial and Industrial Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    Longmont Power & Communications, in conjunction with the Platte River Power Authority provides businesses incentives for new construction projects and existing building retrofits. The Electric...

  14. Loveland Water & Power - Commercial and Industrial Energy Efficiency...

    Broader source: Energy.gov (indexed) [DOE]

    250 Office Lighting: 5 - 20 SensorsControls: 7 - 90 Summary Loveland Water & Power, in conjunction with the Platte River Power Authority provides businesses...

  15. Estes Park Light and Power Department - Commercial and Industrial...

    Broader source: Energy.gov (indexed) [DOE]

    Virtualization: 250 Office Lighting: 5 - 20 SensorsControls: 7 - 90 Summary Estes Park Power & Light, in conjunction with the Platte River Power Authority provides businesses...

  16. River resort owners find LPG a power behind their success

    SciTech Connect (OSTI)

    Not Available

    1991-01-01

    This paper reports on a restaurant and resort which runs entirely on LPG. It has two generators converted to LPG that supply the power for the complex. Energy supplied from the propane is used in the kitchens, to drive the water pump and provide electricity for lighting and other power needs, and to heat the swimming pool. Far more importantly for the owners has been the fuel cost savings of at least 60%.

  17. Oregon Willamette River Basin Mitigation Agreement | Open Energy...

    Open Energy Info (EERE)

    River Basin Mitigation Agreement Author State of Oregon Recipient Bonneville Power Administration Published Publisher Not Provided, 10222010 DOI Not Provided Check for DOI...

  18. Microsoft PowerPoint - Snippet 4.5 Authorized Unpriced Work 20140722...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Authorized Unpriced Work, or AUW, or as some refer to it, Authorized Not-Yet Negotiated. 1 Authorized Unpriced Work is the estimated cost (excluding fee or profit) for contract ...

  19. WABASH RIVER INTEGRATED METHANOL AND POWER PRODUCTION FROM CLEAN COAL TECHNOLOGIES (IMPPCCT)

    SciTech Connect (OSTI)

    Albert Tsang

    2003-03-14

    The Wabash River Integrated Methanol and Power Production from Clean Coal Technologies (IMPPCCT) project is evaluating integrated electrical power generation and methanol production through clean coal technologies. The project is conducted by a multi-industry team lead by Gasification Engineering Corporation (GEC), a company of Global Energy Inc., and supported by Air Products and Chemicals, Inc., Dow Chemical Company, Dow Corning Corporation, Methanex Corporation, and Siemens Westinghouse Power Corporation. Three project phases are planned for execution over several years, including: (1) Feasibility study and conceptual design for an integrated demonstration facility, and for fence-line commercial embodiment plants (CEP) operated at Dow Chemical or Dow Corning chemical plant locations (2) Research, development, and testing to define any technology gaps or critical design and integration issues (3) Engineering design and financing plan to install an integrated commercial demonstration facility at the existing Wabash River Energy Limited (WREL) plant in West Terre Haute, Indiana.

  20. Estes Park Light and Power Department- Commercial and Industrial Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    Estes Park Power & Light, in conjunction with the Platte River Power Authority provides businesses incentives for new construction projects and existing building retrofits. The Electric...

  1. Clinch River Breeder Reactor: an assessment of need for power and regulatory issues

    SciTech Connect (OSTI)

    Hamblin, D M; Tepel, R C; Bjornstad, D J; Hill, L J; Cantor, R A; Carroll, P J; Cohn, S M; Hadder, G R; Holcomb, B D; Johnson, K E

    1983-09-01

    The purpose of this report is to present the results of a research effort designed to assist the US Department of Energy in: (1) reviewing the need for power from the Clinch River Breeder Reactor (CRBR) in the Southeastern Electric Reliability Council (SERC) region, not including Florida, and (2) isolating specific regulatory and institutional issues and physical transmission capacities that may constrain the market for CRBR power. A review of existing electric power wheeling arrangements in the Southeast and specific federal and state regulatory obstacles that may affect power sales from the CRBR was undertaken. This review was a contributing factor to a decision to target the service territory to SERC-less Florida.

  2. Risk-based inspection guide for Crystal River Unit 3 Nuclear Power Plant

    SciTech Connect (OSTI)

    Smith, B.W.; Dukelow, J.S.; Vo, T.V.; Harris, M.S.; Gore, B.F.; Hunt, S.T. )

    1991-06-01

    The Level 1 probabilistic risk assessment (PRA) for Crystal River Unit 3 (CR-3) has been analyzed to identify plant systems and components important to minimizing public risk, as measured by system contributions to plant core damage frequency, and to identify the primary failure modes for these components. The report presents a series of tables, organized by system and prioritized by risk importance, which identify components associated with 98% of the inspectable risk due to plant operation. The systems addressed, in descending order to risk importance are: Low Pressure Injection, AC Power, Service Water, Demineralized Water, High Pressure Injection, DC Power, Emergency Feedwater, Reactor Coolant Pressure Control, and Power Conversion. This ranking is based on the Fussell-Vesely measure of risk importance, i.e., the fraction of the total core damage frequency which involves failures of the system of interest. 3 refs., 9 figs., 13 tabs.

  3. NEPA analysis of US-Canadian power transactions under the Columbia River Treaty

    SciTech Connect (OSTI)

    Pierce, K.S.; Weintraub, N.H.; Linehan, A.O.

    1995-12-01

    The Columbia River Treaty of 1961 led to the development of three hydroelectric projects on the Columbia River in Canada and one in the United States. Canada sold its share of the downstream power generation benefits of these facilities to US utilities for 30 years. The administrator of the Bonneville Power Administration (BPA) of the US Department of Energy is the {open_quotes}United States Entity{close_quotes} under the Columbia River Treaty with Canada. BPA prepared the {open_quotes}Delivery of the Canadian Entitlement{close_quotes} Environmental Impact Statement (EIS) to evaluate alternative means for the US to return to Canada the Canadian share of the downstream benefits when these 30-year agreements expire. Alternatives on both sides of the US-Canada border included new high-voltage transmission lines; new generating and conservation resources; and power sales, exchanges, and other transactions. BPA developed an EIS methodology and graphical representation technique for comparing the diverse options associated with the Delivery of the Canadian Entitlement that were instrumental in helping managers understand the impacts of alternatives in a timely manner. A graphical, modular approach helped convey complex relationships in ways that were easy to read and understand. In addition, analysis of potential environmental impacts in Canada was developed in order to provide relevant information to US decision-makers, without compromising the Canadian environmental review process. As a result, environmental analysis was fully integrated into the decision process. The EIS approach used in this project has become a prototype for other Department of Energy NEPA documents, both site-specific and programmatic.

  4. Microsoft PowerPoint - 2011_1012_Hansen_ColumbiaRiverComponent_Eco.pptx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Component Risk Assessment Volume I: Screening Level Ecological Risk Assessment (DOE/RL-2010-117, Draft A) Ri C id (DOE/RL 2010 117, Draft A) Overview and key findings River Corridor Closure Project River Corridor Closure Project y g O t b 2011 October, 2011 Protecting the Columbia River U.S. Department of Energy Richland Operations Office RIVER CORRIDOR CLOSURE PROJECT Columbia River Component Columbia River Component Ecological Risk Assessment * Scope - Screening level ecological risk

  5. WABASH RIVER INTEGRATED METHANOL AND POWER PRODUCTION FROM CLEAN COAL TECHNOLOGIES (IMPPCCT)

    SciTech Connect (OSTI)

    Thomas Lynch

    2004-01-07

    The Wabash River Integrated Methanol and Power Production from Clean Coal Technologies (IMPPCCT) project is evaluating integrated electrical power generation and methanol production through clean coal technologies. The project is conducted by a multi-industry team lead previously by Gasification Engineering Corporation (GEC). The project is now under the leadership of ConocoPhillips Company (COP) after it acquired GEC and the E-Gas{trademark} gasification technology from Global Energy in July 2003. The Phase I of this project was supported by Air Products and Chemicals, Inc., Dow Chemical Company, Dow Corning Corporation, Methanex Corporation, and Siemens Westinghouse Power Corporation, while the Phase II is supported by Gas Technology Institute, TDA Research, Inc., and Nucon International, Inc. The two project phases planned for execution include: (1) Feasibility study and conceptual design for an integrated demonstration facility at Global Energy's existing Wabash River Energy Limited (WREL) plant in West Terre Haute, Indiana, and for a fence-line commercial embodiment plants (CEP) operated at Dow Chemical or Dow Corning chemical plant locations (2) Research, development, and testing (RD&T) to define any technology gaps or critical design and integration issues. The WREL facility was designed, constructed, and operated under a project selected and co-funded under the Round IV of the United States Department of Energy's (DOE's) Clean Coal Technology Program. In this project, coal and/or other solid fuel feedstocks are gasified in an oxygen-blown, entrained-flow gasifier with continuous slag removal and a dry particulate removal system. The resulting product synthesis gas is used to fuel a combustion turbine generator whose exhaust is integrated with a heat recovery steam generator to drive a refurbished steam turbine generator. The gasifier uses technology initially developed by The Dow Chemical Company (the Destec Gasification Process), and now acquired and

  6. WABASH RIVER INTEGRATED METHANOL AND POWER PRODUCTION FROM CLEAN COAL TECHNOLOGIES (IMPPCCT)

    SciTech Connect (OSTI)

    Gary Harmond; Albert Tsang

    2003-03-14

    The Wabash River Integrated Methanol and Power Production from Clean Coal Technologies (IMPPCCT) project is evaluating integrated electrical power generation and methanol production through clean coal technologies. The project is conducted by a multi-industry team lead by Gasification Engineering Corporation (GEC), a company of Global Energy Inc., and supported by Air Products and Chemicals, Inc., Dow Chemical Company, Dow Corning Corporation, Methanex Corporation, and Siemens Westinghouse Power Corporation. Three project phases are planned for execution over a three year period, including: (1) Feasibility study and conceptual design for an integrated demonstration facility, and for fence-line commercial embodiment plants (CEP) operated at Dow Chemical or Dow Corning chemical plant locations (2) Research, development, and testing to define any technology gaps or critical design and integration issues (3) Engineering design and financing plan to install an integrated commercial demonstration facility at the existing Wabash River Energy Limited (WREL) plant in West Terre Haute, Indiana. The WREL facility is a project selected and co-funded under the Round IV of the U.S. Department of Energy's (DOE's) Clean Coal Technology Program. In this project, coal and/or other solid fuel feedstocks are gasified in an oxygen-blown, entrained-flow gasifier with continuous slag removal and a dry particulate removal system. The resulting product synthesis gas is used to fuel a combustion turbine generator whose exhaust is integrated with a heat recovery steam generator to drive a refurbished steam turbine generator. The gasifier uses technology initially developed by The Dow Chemical Company (the Destec Gasification Process), and now offered commercially by Global Energy, Inc., as the E-GAS{trademark} technology. In a joint effort with the DOE, a Cooperative Agreement was awarded under the Early Entrance Coproduction Plant (EECP) solicitation. GEC and an Industrial Consortium are

  7. WABASH RIVER IMPPCCT, INTEGRATED METHANOL AND POWER PRODUCTION FROM CLEAN COAL TECHNOLOGIES

    SciTech Connect (OSTI)

    Doug Strickland

    2001-09-28

    In a joint effort with the U.S. Department of Energy, working under a Cooperative Agreement Award from the ''Early Entrance Coproduction Plant'' (EECP) initiative, the Gasification Engineering Corporation and an Industrial Consortium are investigating the application of synthesis gas from the E-GAS{trademark} technology to a coproduction environment to enhance the efficiency and productivity of solid fuel gasification combined cycle power plants. The objectives of this effort are to determine the feasibility of an Early Entrance Coproduction Plant located at a specific site which produces some combination of electric power (or heat), fuels, and/or chemicals from synthesis gas derived from coal, or, coal in combination with some other carbonaceous feedstock. The project's intended result is to provide the necessary technical, financial, and environmental information that will be needed to move the EECP forward to detailed design, construction, and operation by industry. The Wabash River Integrated Methanol and Power Production from Clean Coal Technologies (IMPPCCT) project is evaluating integrated electrical power generation and methanol production through clean coal technologies. The project is conducted by a multi-industry team lead by Gasification Engineering Corporation (GEC), and supported by Air Products and Chemicals Inc., The Dow Chemical Company, Dow Corning Corporation, Methanex Corporation, and Siemens Westinghouse Power Corporation. Three project phases are planned for execution, including: (1) Feasibility Study and conceptual design for an integrated demonstration facility and for fence-line commercial plants operated at The Dow Chemical Company or Dow Corning Corporation chemical plant locations (i.e. the Commercial Embodiment Plant or CEP) (2) Research, development, and testing to address any technology gaps or critical design and integration issues (3) Engineering design and financing plan to install an integrated commercial demonstration facility at

  8. Negotiating river ecosystems: Impact assessment and conflict mediation in the cases of hydro-power construction

    SciTech Connect (OSTI)

    Karjalainen, Timo P., E-mail: timopauli.karjalainen@oulu.f [Thule Institute, University of Oulu, P.O. Box 7300, FI-90014 University of Oulu (Finland); Jaervikoski, Timo, E-mail: timo.jarvikoski@oulu.f [Unit of Sociology, University of Oulu, P.O. Box 2000, FI-90014 University of Oulu (Finland)

    2010-09-15

    In this paper we discuss how the legitimacy of the impact assessment process is a key issue in conflict mediation in environmental impact assessment. We contrast two EIA cases in hydro-power generation plans made for the Ii River, Finland in different decades, and evaluate how impact assessment in these cases has contributed to the creation, mediation and resolution of conflicts. We focus on the elements of distributional and procedural justice that made the former EIA process more legitimate and consensual and the latter more conflictual. The results indicate that it is crucial for conflict mediation to include all the values and interests of the parties in the goal-setting process and in the definition and assessment of alternatives. The analysis also indicates that procedural justice is the most important to help the people and groups involved to accept the legitimacy of the impact assessment process: how different parties and their values and interests are recognized, and how participation and distribution of power are organized in an impact assessment process. It is confirmed in this article that SIA may act as a mediator or a forum providing a process through which competing knowledge claims, various values and interests can be discussed and linked to the proposed alternatives and interventions.

  9. WABASH RIVER INTEGRATED METHANOL AND POWER PRODUCTION FROM CLEAN COAL TECHNOLOGIES (IMPPCCT)

    SciTech Connect (OSTI)

    Doug Strickland; Albert Tsang

    2002-10-14

    The Wabash River Integrated Methanol and Power Production from Clean Coal Technologies (IMPPCCT) project is evaluating integrated electrical power generation and methanol production through clean coal technologies. The project is conducted by a multi-industry team lead by Gasification Engineering Corporation (GEC), and supported by Air Products and Chemicals, Inc., Dow Chemical Company, Dow Corning Corporation, Methanex Corporation, and Siemens Westinghouse Power Corporation. Three project phases are planned for execution over a three year period, including: (1) Feasibility study and conceptual design for an integrated demonstration facility, and for fence-line commercial plants operated at Dow Chemical or Dow Corning chemical plant locations; (2) Research, development, and testing to define any technology gaps or critical design and integration issues; and (3) Engineering design and financing plan to install an integrated commercial demonstration facility at the existing Wabash River Energy Limited (WREL) plant in West Terre Haute, Indiana. This report describes management planning, work breakdown structure development, and feasibility study activities by the IMPPCCT consortium in support of the first project phase. Project planning activities have been completed, and a project timeline and task list has been generated. Requirements for an economic model to evaluate the West Terre Haute implementation and for other commercial implementations are being defined. Specifications for methanol product and availability of local feedstocks for potential commercial embodiment plant sites have been defined. The WREL facility is a project selected and co-funded under the fifth phase solicitation of the U.S. Department of Energy's Clean Coal Technology Program. In this project, coal and/or other solid fuel feedstocks are gasified in an oxygen-blown, entrained-flow gasifier with continuous slag removal and a dry particulate removal system. The resulting product synthesis gas

  10. WABASH RIVER INTEGRATED METHANOL AND POWER PRODUCTION FROM CLEAN COAL TECHNOLOGIES (IMPPCCT)

    SciTech Connect (OSTI)

    Albert Tsang

    2003-03-14

    The Wabash River Integrated Methanol and Power Production from Clean Coal Technologies (IMPPCCT) project is evaluating integrated electrical power generation and methanol production through clean coal technologies. The project is conducted by a multi-industry team lead by Gasification Engineering Corporation (GEC), and supported by Air Products and Chemicals, Inc., Dow Chemical Company, Dow Corning Corporation, Methanex Corporation, and Siemens Westinghouse Power Corporation. Three project phases are planned for execution, including: (1) Feasibility study and conceptual design for an integrated demonstration facility, and for fence-line commercial embodiment plants (CEP) operated at Dow Chemical or Dow Corning chemical plant locations (2) Research, development, and testing (RD&T) to define any technology gaps or critical design and integration issues (3) Engineering design and financing plan to install an integrated commercial demonstration facility at the existing Wabash River Energy Limited (WREL) plant in West Terre Haute, Indiana. The WREL facility is a project selected and co-funded under the Round IV of the United States Department of Energy's (DOE's) Clean Coal Technology Program. In this project, coal and/or other solid fuel feedstocks are gasified in an oxygen-blown, entrained-flow gasifier with continuous slag removal and a dry particulate removal system. The resulting product synthesis gas is used to fuel a combustion turbine generator whose exhaust is integrated with a heat recovery steam generator to drive a refurbished steam turbine generator. The gasifier uses technology initially developed by The Dow Chemical Company (the Destec Gasification Process), and now offered commercially by Global Energy, Inc., parent company of GEC and WREL, as the E-GAS{trademark} technology. In a joint effort with the DOE, a Cooperative Agreement was awarded under the Early Entrance Coproduction Plant (EECP) solicitation. GEC and an Industrial Consortium are

  11. WABASH RIVER INTEGRATED METHANOL AND POWER PRODUCTION FROM CLEAN COAL TECHNOLOGIES (IMPPCCT)

    SciTech Connect (OSTI)

    Albert Tsang

    2003-10-14

    The Wabash River Integrated Methanol and Power Production from Clean Coal Technologies (IMPPCCT) project is evaluating integrated electrical power generation and methanol production through clean coal technologies. The project is conducted by a multi-industry team lead by Gasification Engineering Corporation (GEC), and supported by Air Products and Chemicals, Inc., Dow Chemical Company, Dow Corning Corporation, Methanex Corporation, and Siemens Westinghouse Power Corporation. Two project phases are planned for execution, including: (1) Feasibility study and conceptual design for an integrated demonstration facility at the existing Wabash River Energy Limited (WREL) plant in West Terre Haute, Indiana, and for a fence-line commercial embodiment plants (CEP) operated at Dow Chemical or Dow Corning chemical plant locations (2) Research, development, and testing (RD&T) to define any technology gaps or critical design and integration issues. The WREL facility is a project selected and co-funded under the Round IV of the United States Department of Energy's (DOE's) Clean Coal Technology Program. In this project, coal and/or other solid fuel feedstocks are gasified in an oxygen-blown, entrained-flow gasifier with continuous slag removal and a dry particulate removal system. The resulting product synthesis gas is used to fuel a combustion turbine generator whose exhaust is integrated with a heat recovery steam generator to drive a refurbished steam turbine generator. The gasifier uses technology initially developed by The Dow Chemical Company (the Destec Gasification Process), and now offered commercially by Global Energy, Inc., parent company of GEC and WREL, as the E-GAS{trademark} technology. In a joint effort with the DOE, a Cooperative Agreement was awarded under the Early Entrance Coproduction Plant (EECP) solicitation. GEC and an Industrial Consortium are investigating the use of synthesis gas produced by the E-GAS{trademark} technology in a coproduction environment

  12. Microsoft PowerPoint - Columbia_River_Corridor_Rev_2_v2.ppt [Compatibility Mode]

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9 Columbia River Corridor The Columbia River Corridor projects selected for Recovery A t f di i l d d li hi f iliti di ti Act funding include demolishing facilities, remediating waste sites, and containing and treating contamination in groundwater. The projects support completing cleanup along the Columbia River and shrinking the active area of cleanup to the center of the Hanford Site (the Central Plateau) by 2015 1 of the Hanford Site (the Central Plateau) by 2015. May 2009 Shrinking the

  13. Wabash River Integrated Methanol and Power Production from Clean Coal Technologies (IMPPCCT)

    SciTech Connect (OSTI)

    Conocophillips

    2007-09-30

    The Wabash River Integrated Methanol and Power Production from Clean Coal Technologies (IMPPCCT) project was established to evaluate integrated electrical power generation and methanol production through clean coal technologies. The project was under the leadership of ConocoPhillips Company (COP), after it acquired Gasification Engineering Corporation (GEC) and the E-Gas gasification technology from Global Energy Inc. in July 2003. The project has completed both Phase 1 and Phase 2 of development. The two project phases include the following: (1) Feasibility study and conceptual design for an integrated demonstration facility at SG Solutions LLC (SGS), previously the Wabash River Energy Limited, Gasification Facility located in West Terre Haute, Indiana, and for a fence-line commercial embodiment plant (CEP) operated at the Dow Chemical Company or Dow Corning Corporation chemical plant locations. (2) Research, development, and testing (RD&T) to define any technology gaps or critical design and integration issues. Phase 1 of this project was supported by a multi-industry team consisting of Air Products and Chemicals, Inc., The Dow Chemical Company, Dow Corning Corporation, Methanex Corporation, and Siemens Westinghouse Power Corporation, while Phase 2 was supported by Gas Technology Institute, TDA Research Inc., and Nucon International, Inc. The SGS integrated gasification combined cycle (IGCC) facility was designed, constructed, and operated under a project selected and co-funded under the Round IV of the United States Department of Energy's (DOE's) Clean Coal Technology Program. In this project, coal and/or other carbonaceous fuel feedstocks are gasified in an oxygen-blown, entrained-flow gasifier with continuous slag removal and a dry particulate removal system. The resulting product synthesis gas (syngas) is used to fuel a combustion turbine generator whose exhaust is integrated with a heat recovery steam generator to drive a refurbished steam turbine generator

  14. WABASH RIVER INTEGRATED METHANOL AND POWER PRODUCTION FROM CLEAN COAL TECHNOLGIES (IMPPCCT)

    SciTech Connect (OSTI)

    Albert C. Tsang

    2004-03-26

    The Wabash River Integrated Methanol and Power Production from Clean Coal Technologies (IMPPCCT) project is evaluating integrated electrical power generation and methanol production through clean coal technologies. The project is under the leadership of ConocoPhillips Company (COP), after it acquired Gasification Engineering Corporation (GEC) and the E-Gas gasification technology from Global Energy in July 2003. The project has completed Phase I, and is currently in Phase II of development. The two project phases include: (1) Feasibility study and conceptual design for an integrated demonstration facility at Global Energy's existing Wabash River Energy Limited (WREL) plant in West Terre Haute, Indiana, and for a fence-line commercial embodiment plants (CEP) operated at Dow Chemical or Dow Corning chemical plant locations; and (2) Research, development, and testing (RD&T) to define any technology gaps or critical design and integration issues. The Phase I of this project was supported by a multi-industry team consisting of Air Products and Chemicals, Inc., Dow Chemical Company, Dow Corning Corporation, Methanex Corporation, and Siemens Westinghouse Power Corporation, while Phase II is supported by Gas Technology Institute, TDA Research Inc., and Nucon International, Inc. The WREL integrated gasification combined cycle (IGCC) facility was designed, constructed, and operated under a project selected and co-funded under the Round IV of the United States Department of Energy's (DOE's) Clean Coal Technology Program. In this project, coal and/or other solid fuel feedstocks are gasified in an oxygen-blown, entrained-flow gasifier with continuous slag removal and a dry particulate removal system. The resulting product synthesis gas is used to fuel a combustion turbine generator whose exhaust is integrated with a heat recovery steam generator to drive a refurbished steam turbine generator. The gasifier uses technology initially developed by The Dow Chemical Company (the

  15. Title: Author(s):

    Office of Scientific and Technical Information (OSTI)

    Fuel cells have been successfully demonstrated in a number of aerospace, utility and military applications, however, the high cost of fuel cells compared to conventional power ...

  16. Turbines Off NYC East River Will Provide Power to 9,500 Residents...

    Broader source: Energy.gov (indexed) [DOE]

    ... Addthis Related Articles Artist rendering of Ocean Power Technologies' proposed wave park off the coast of Oregon. | Photo courtesy of Ocean Power Technologies. Ocean Energy ...

  17. 2,"Laramie River Station","Coal","Basin Electric Power Coop",1710

    U.S. Energy Information Administration (EIA) Indexed Site

    Wyoming" ,"Plant","Primary energy source","Operating company","Net summer capacity (MW)" 1,"Jim Bridger","Coal","PacifiCorp",2111 2,"Laramie River Station","Coal","Basin Electric Power Coop",1710 3,"Dave Johnston","Coal","PacifiCorp",760 4,"Naughton","Coal","PacifiCorp",687 5,"Dry Fork Station","Coal","Basin

  18. Comments by the American Electric Power System on Proposed Coordination of Federal Authorizations for Electric Transmission Facilities

    Broader source: Energy.gov [DOE]

     Proposed Coordination of Federal Authorizations for Electric Transmission Facilities – Interim Final Rule and Proposed Rule (DOE, 10 CR Part 900): The utility operating companies of the American...

  19. Microsoft PowerPoint - River Protection Project HAB.ppt [Read-Only]

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    River Protection Project Waste Treatment & Disposition January 2009 1 2 Insights From External Review Analyses * No need to make LAW ST decision now: make in 2015 - 2017 once Na/Al uncertainties reduced, M-2/M-3 Pretreatment issues resolved, and improved overall integrated RPP system understanding in place (e.g., System Plan 4) * WTP LAW Facility alone cannot complete LAW immobilization mission in same timeframe as HLW mission even with 3 rd melter or higher capacity melters. Third melter

  20. Microsoft PowerPoint - Zachara HAB-River Plateau Mtg 1-8-09.ppt

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    M. Zachara Pacific Northwest National Laboratory, Richland, WA 99354 John M. Zachara Pacific Northwest National Laboratory, Richland, WA 99354 Hanford 300 A IFC River & Plateau Mtg January 8, 2009 Office of Science/Environmental Remediation Sciences Division (ERSD) Supported Research at Hanford: The PNNL Scientific Focus Area (SFA) and Integrated Field Research Challenge (IFRC) Office of Science/Environmental Remediation Sciences Division (ERSD) Supported Research at Hanford: The PNNL

  1. Guide to authorization procedures for the international export of electricity and electric power lines crossing international borders

    SciTech Connect (OSTI)

    1980-11-01

    The Economic Regulatory Administration (ERA) has prepared this guide to assist utilities and other entities in filing applications for (1) authorizations to export electricity and (2) Presidential Permits. The guide is not intended to be all inclusive; however, it will provide an applicant with the type of information required in the application, define lead times, and direct an applicant to the proper source documents for preparing a complete application. The booklet is organized into two sections. The first part outlines the procedures for preparing an application for authorization to export electricity. The second part outlines the procedures for applying for a Presidential Permit to construct, connect, operate, or maintain electric transmission facilities at international boundaries.

  2. Security during the Construction of New Nuclear Power Plants: Technical Basis for Access Authorization and Fitness-For-Duty Requirements

    SciTech Connect (OSTI)

    Branch, Kristi M.; Baker, Kathryn A.

    2009-09-01

    A technical letter report to the NRC summarizing the findings of a benchmarking study, literature review, and workshop with experts on current industry standards and expert judgments about needs for security during the construction phase of critical infrastructure facilities in the post-September 11 U.S. context, with a special focus on the construction phase of nuclear power plants and personnel security measures.

  3. PP-366 Twin Rivers Paper Company, Inc. | Department of Energy

    Office of Environmental Management (EM)

    6 Twin Rivers Paper Company, Inc. PP-366 Twin Rivers Paper Company, Inc. Presidential Permit authorizing Twin Rivers Paper Company, Inc. to construct, operate, and maintain ...

  4. EA-273 Rainy River Energy Corporation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rainy River Energy Corporation EA-273 Rainy River Energy Corporation Order authorizing Rainy River Energy Corporation to export electric energy to Canada. PDF icon EA-273 Rainy ...

  5. 1,"Robert Moses Niagara","Hydroelectric","New York Power Authority",2438.8

    U.S. Energy Information Administration (EIA) Indexed Site

    York" ,"Plant","Primary energy source","Operating company","Net summer capacity (MW)" 1,"Robert Moses Niagara","Hydroelectric","New York Power Authority",2438.8 2,"Ravenswood","Natural gas","TC Ravenswood LLC",2216.5 3,"Nine Mile Point Nuclear Station","Nuclear","Nine Mile Point Nuclear Sta LLC",1937 4,"Oswego Harbor

  6. Author Select

    Office of Scientific and Technical Information (OSTI)

    Authors Please use the pane on the left to start the selection process.

  7. Great River (1973)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Volume One Film Collection Volume Two 75th Anniversary Hydropower in the Northwest Woody Guthrie Videos Strategic Direction Branding & Logos Power of the River History Book...

  8. Author Guidelines

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of Energy (DOE). Authors of publications are required to report all ALS-related work, i.e., journal articles, conference presentations, books or book chapters, theses,...

  9. Author Select

    Office of Scientific and Technical Information (OSTI)

    Author Select Last Name First Name search Type in a name, or the first few letters of a name, in one or both of appropriate search boxes above and select "Go". An attempt will be made to match authors that most closely relate to the text you typed.

  10. River and Plateau Committee

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of Energy River Turbine Provides Clean Energy to Remote Alaskan Village River Turbine Provides Clean Energy to Remote Alaskan Village August 18, 2015 - 10:36am Addthis River Turbine Provides Clean Energy to Remote Alaskan Village Alison LaBonte Marine and Hydrokinetic Technology Manager To date, Ocean Renewable Power Company (ORPC) is the only company to have built, operated and delivered power to a utility grid from a hydrokinetic tidal project, and to a local microgrid from a hydrokinetic

  11. Passage Distribution and Federal Columbia River Power System Survival for Steelhead Kelts Tagged Above and at Lower Granite Dam, Year 2

    SciTech Connect (OSTI)

    Colotelo, Alison HA; Harnish, Ryan A.; Jones, Bryan W.; Hanson, Amanda C.; Trott, Donna M.; Greiner, Michael J.; McMichael, Geoffrey A.; Ham, Kenneth D.; Deng, Zhiqun; Brown, Richard S.; Weiland, Mark A.; Li, X.; Fu, Tao

    2014-03-28

    Steelhead (Oncorhynchus mykiss) populations have declined throughout their range in the last century and many populations, including those of the Snake River Basin are listed under the Endangered Species Act of 1973. The reasons for their decline are many and complex, but include habitat loss and degradation, overharvesting, and dam construction. The 2008 Biological Opinion calls for an increase in the abundance of female steelhead through an increase in iteroparity (i.e., repeat spawning) and this can be realized through a combination of reconditioning and in-river survival of migrating kelts. The goal of this study is to provide the data necessary to inform fisheries managers and dam operators of Snake River kelt migration patterns, survival, and routes of dam passage. Steelhead kelts (n = 487) were captured and implanted with acoustic transmitters and passive integrated transponder (PIT)-tags at the Lower Granite Dam (LGR) Juvenile Fish Facility and at weirs located in tributaries of the Snake and Clearwater rivers upstream of LGR. Kelts were monitored as they moved downstream through the Federal Columbia River Power System (FCRPS) by 15 autonomous and 3 cabled acoustic receiver arrays. Cabled receiver arrays deployed on the dam faces allowed for three-dimensional tracking of fish as they approached the dam face and were used to determine the route of dam passage. Overall, 27.3% of the kelts tagged in this study successfully migrated to Martin Bluff (rkm 126, as measured from the mouth of the Columbia River), which is located downstream of all FCRPS dams. Within individual river reaches, survival per kilometer estimates ranged from 0.958 to 0.999; the lowest estimates were observed in the immediate forebay of FCRPS dams. Steelhead kelts tagged in this study passed over the spillway routes (spillway weirs, traditional spill bays) in greater proportions and survived at higher rates compared to the few fish passed through powerhouse routes (turbines and juvenile

  12. Passage Distribution and Federal Columbia River Power System Survival for Steelhead Kelts Tagged Above and at Lower Granite Dam, Year 2

    SciTech Connect (OSTI)

    Colotelo, Alison H.A.; Harnish, Ryan A.; Jones, Bryan W.; Hanson, Amanda C.; Trott, Donna M.; Greiner, Michael J.; Mcmichael, Geoffrey A.; Ham, Kenneth D.; Deng, Zhiqun; Brown, Richard S.; Weiland, Mark A.; Li, Xinya; Fu, Tao

    2014-12-15

    Steelhead (Oncorhynchus mykiss) populations have declined throughout their range in the last century and many populations, including those of the Snake River Basin are listed under the Endangered Species Act of 1973. The reasons for their decline are many and complex, but include habitat loss and degradation, overharvesting, and dam construction. The 2008 Biological Opinion calls for an increase in the abundance of female steelhead through an increase in iteroparity (i.e., repeat spawning) and this can be realized through a combination of reconditioning and in-river survival of migrating kelts. The goal of this study is to provide the data necessary to inform fisheries managers and dam operators of Snake River kelt migration patterns, survival, and routes of dam passage. Steelhead kelts (n = 487) were captured and implanted with acoustic transmitters and passive integrated transponder (PIT)-tags at the Lower Granite Dam (LGR) Juvenile Fish Facility and at weirs located in tributaries of the Snake and Clearwater rivers upstream of LGR. Kelts were monitored as they moved downstream through the Federal Columbia River Power System (FCRPS) by 15 autonomous and 3 cabled acoustic receiver arrays. Cabled receiver arrays deployed on the dam faces allowed for three-dimensional tracking of fish as they approached the dam face and were used to determine the route of dam passage. Overall, 27.3% of the kelts tagged in this study successfully migrated to Martin Bluff (rkm 126, as measured from the mouth of the Columbia River), which is located downstream of all FCRPS dams. Within individual river reaches, survival per kilometer estimates ranged from 0.958 to 0.999; the lowest estimates were observed in the immediate forebay of FCRPS dams. Steelhead kelts tagged in this study passed over the spillway routes (spillway weirs, traditional spill bays) in greater proportions and survived at higher rates compared to the few fish passed through powerhouse routes (turbines and juvenile

  13. Author Select

    Office of Scientific and Technical Information (OSTI)

    Selection List Select "add" or "add all", which appear after author's names in the middle pane, to add to the search strategy that appears in this pane. Return to Search >>

  14. Author Select

    Office of Scientific and Technical Information (OSTI)

    Author Select Last Name First Name search Type in a name, or the first few letters of a name, in one or both of appropriate search boxes above and select "Go". An attempt will be...

  15. Author Select

    Office of Scientific and Technical Information (OSTI)

    Selection List Select "add" or "add all", which appear after author's names in the middle pane, to add to the search strategy that appears in this pane. Return to Search >>

  16. Elink - Authorities

    Office of Scientific and Technical Information (OSTI)

    Authorities These authority lists are established and used by DOE to standardize information in bibliographic records. Language, sponsoring organizations, originating research organizations, subject categories, and country of publication must be entered in required formats to optimize search and retrieval. The DOE Order 241.1B requires that DOE-funded STI include attribution to the sponsoring program with wording including DOE, the DOE program office, and the program office's subprogram(s)

  17. Export Authorizations | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Export Authorizations Export Authorizations Below is a listing of export authorizations grouped by Canada and Mexico. Export Authorizations - Canada Export Authorizations - Mexico Export Authorizations - Canada BACK TO TOP Docket No. Company Date Issued EA-63-C Northern States Power 01/18/06 EA-64 Basin Electric Power 03/06/80 EA-64-A Basin Electric Power 12/18/09 EA-66-B Citizens Utilities 02/13/95 EA-82 Joint Owners of the Highgate Project 07/07/92 EA-97-B Portland General Electric 03/05/98

  18. Subtask 7.4 - Power River Basin Subbituminous Coal-Biomass Cogasification Testing in a Transport Reactor

    SciTech Connect (OSTI)

    Michael Swanson; Daniel Laudal

    2009-03-01

    The U.S. Department of Energy (DOE) National Energy Technology Laboratory Office of Coal and Environmental Systems has as its mission to develop advanced gasification-based technologies for affordable, efficient, zero-emission power generation. These advanced power systems, which are expected to produce near-zero pollutants, are an integral part of DOE's Vision 21 Program. DOE has also been developing advanced gasification systems that lower the capital and operating costs of producing syngas for chemical production. A transport reactor has shown potential to be a low-cost syngas producer compared to other gasification systems since its high-throughput-per-unit cross-sectional area reduces capital costs. This work directly supports the Power Systems Development Facility utilizing the Kellogg Brown and Root transport reactor located at the Southern Company Services Wilsonville, Alabama, site. Over 3600 hours of operation on 17 different coals ranging from bituminous to lignite along with a petroleum coke has been completed to date in the pilot-scale transport reactor development unit (TRDU) at the Energy & Environmental Research Center (EERC). The EERC has established an extensive database on the operation of these various fuels in both air- and oxygen-blown modes utilizing a pilot-scale transport reactor gasifier. This database has been useful in determining the effectiveness of design changes on an advanced transport reactor gasifier and for determining the performance of various feedstocks in a transport reactor. The effects of different fuel types on both gasifier performance and the operation of the hot-gas filter system have been determined. It has been demonstrated that corrected fuel gas heating values ranging from 90 to 130 Btu/scf have been achieved in air-blown mode, while heating values up to 230 Btu/scf on a dry basis have been achieved in oxygen-blown mode. Carbon conversions up to 90% have also been obtained and are highly dependent on the oxygen

  19. BPA Power Generation (pbl/main)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Generation Hydro Power Wind Power Monthly GSP BPA White Book Dry Year Tools Firstgov Power Generation Hydro Power Federal Columbia River Power System (FCRPS) Hydro Projects FCRPS...

  20. Look to the River Columbia River Opens New Opportunities for...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Volume One Film Collection Volume Two 75th Anniversary Hydropower in the Northwest Woody Guthrie Videos Strategic Direction Branding & Logos Power of the River History Book...

  1. Export Authorizations - Procedures | Department of Energy

    Energy Savers [EERE]

    Export Authorizations - Procedures Export Authorizations - Procedures Part II, Section 202(e) of the Federal Power Act (FPA) states that exports of electric energy should be...

  2. Categorical Exclusion Determinations: Western Area PowerAdministratio...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Colorado River Storage Project Management Center Categorical Exclusion Determinations: Western Area Power Administration-Colorado River Storage Project Management Center ...

  3. Interagency Wild and Scenic Rivers Coordinating Council's WSRA...

    Open Energy Info (EERE)

    to use the flowcharts created by the Interagency Wild and Scenic Rivers Coordinating Council. Author The Interagency Wild and Scenic Rivers Coordinating Council Published The...

  4. EA-1973: Kootenai River Restoration at Bonners Ferry, Boundary...

    Energy Savers [EERE]

    73: Kootenai River Restoration at Bonners Ferry, Boundary County, Idaho EA-1973: Kootenai River Restoration at Bonners Ferry, Boundary County, Idaho Summary Bonneville Power...

  5. Trona Injection Tests: Mirant Potomac River Station, Unit 1,...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of the Potomac River Generating Station in Alexandria, Virginia Update 2 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant, Modeling Unit ...

  6. Hood River Production Program Review, Final Report 1991-2001.

    SciTech Connect (OSTI)

    Underwood, Keith; Chapman, Colin; Ackerman, Nicklaus

    2003-12-01

    This document provides a comprehensive review of Bonneville Power Administration (BPA) funded activities within the Hood River Basin from 1991 to 2001. These activities, known as the Hood River Production Program (HRPP), are intended to mitigate for fish losses related to operation of federal dams in the Columbia River Basin, and to contribute to recovery of endangered and/or threatened salmon and steelhead, as directed by Nation Oceanic and Atmospheric Administration - Fisheries (NOAA Fisheries). The Environmental Impact Statement (EIS) for the HRPP, which authorized BPA to fund salmon and steelhead enhancement activities in the Hood River Basin, was completed in 1996 (BPA 1996). The EIS specified seven years of monitoring and evaluation (1996-2002) after program implementation to determine if program actions needed modification to meet program objectives. The EIS also called for a program review after 2002, that review is reported here.

  7. CASL - Tennessee Valley Authority

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tennessee Valley Authority Chattanooga, TN The nation's largest public power company, TVA plans to use more nuclear energy in achieving its vision to be one of the nation's leading providers of low-cost and cleaner energy. Key Contributions Physical reactor design Commercial nuclear plant and nuclear fuel operating data Support for testing and validation Key Outcomes Benchmark and test Virtual Environment for Reactor Applications (VERA) with operating reactor data Facilitate early deployment of

  8. EA-273-A Rainy River Energy Corporation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    -A Rainy River Energy Corporation EA-273-A Rainy River Energy Corporation Order authorizing Rainy River Energy Corporation to export electric energy to Canada. PDF icon EA-273-A ...

  9. Coho Salmon Master Plan, Clearwater River Basin.

    SciTech Connect (OSTI)

    Nez Perce Tribe; FishPro

    2004-10-01

    The Nez Perce Tribe has a desire and a goal to reintroduce and restore coho salmon to the Clearwater River Subbasin at levels of abundance and productivity sufficient to support sustainable runs and annual harvest. Consistent with the Clearwater Subbasin Plan (EcoVista 2003), the Nez Perce Tribe envisions developing an annual escapement of 14,000 coho salmon to the Clearwater River Subbasin. In 1994, the Nez Perce Tribe began coho reintroduction by securing eggs through U.S. v. Oregon; by 1998 this agreement provided an annual transfer of 550,000 coho salmon smolts from lower Columbia River hatchery facilities for release in the Clearwater River Subbasin. In 1998, the Northwest Power and Conservation Council authorized the Bonneville Power Administration to fund the development of a Master Plan to guide this reintroduction effort. This Master Plan describes the results of experimental releases of coho salmon in the Clearwater River Subbasin, which have been ongoing since 1995. These data are combined with results of recent coho reintroduction efforts by the Yakama Nation, general coho life history information, and historical information regarding the distribution and life history of Snake River coho salmon. This information is used to assess a number of alternative strategies aimed at restoring coho salmon to historical habitats in the Clearwater River subbasin. These data suggest that there is a high probability that coho salmon can be restored to the Clearwater River subbasin. In addition, the data also suggest that the re-establishment of coho salmon could be substantially aided by: (1) the construction of low-tech acclimation facilities; (2) the establishment of a 'localized' stock of coho salmon; and (3) the construction of hatchery facilities to provide a source of juvenile coho salmon for future supplementation activities. The Nez Perce Tribe recognizes that there are factors which may limit the success of coho reintroduction. As a result of these

  10. Developing a Natural Gas-Powered Bus Rapid Transit Service: A Case Study on Leadership: Roaring Fork Transportation Authority (Presentation); NREL (National Renewable Energy Laboratory)

    SciTech Connect (OSTI)

    Schroeder, A.

    2015-03-01

    The Roaring Fork Transportation Authority (RFTA) represents a series of unique successes in alternative fuel deployment by pushing the envelope with innovative solutions. In the last year, RFTA demonstrated the ability to utilize compressed natural gas buses at a range of altitudes, across long distances, in extreme weather conditions and in a modern indoor fueling and maintenance facility - allwhile saving money and providing high-quality customer service. This case study will highlight how the leadership of organizations and communities that are implementing advances in natural gas vehicle technology is paving the way for broader participation.

  11. 1,"Coal Creek","Coal","Great River Energy",1144.5 2,"Antelope Valley","Coal","Basin Electric Power Coop",900

    U.S. Energy Information Administration (EIA) Indexed Site

    Dakota" ,"Plant","Primary energy source","Operating company","Net summer capacity (MW)" 1,"Coal Creek","Coal","Great River Energy",1144.5 2,"Antelope Valley","Coal","Basin Electric Power Coop",900 3,"Milton R Young","Coal","Minnkota Power Coop, Inc",684 4,"Leland Olds","Coal","Basin Electric Power Coop",667

  12. Ngatamariki Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Name Ngatamariki Geothermal Power Plant Facility Geothermal Power Plant Sector Geothermal energy Location Information Address Mighty River Power Ngahere House 283...

  13. Development of an Implementation Plan Related to Biological Opinion on Operation of the Federal Columbia River Power System ; Step 1: Review and Critique of Implementation Plans.

    SciTech Connect (OSTI)

    Neitzel, Duane A.; Bunn, Amoret

    2000-12-01

    The Draft Biological Opinion on Operation of the Federal Columbia River Power System calls for the development of 1- and 5-year implementation plans. These plans will provide the roadmap for planning and subsequent implementation of actions intended to meet specific performance standards (i.e., biological objectives) in a timely manner. To develop implementation plans the key tasks and sequences of steps must be determined. Those responsible for specific tasks must be identified and they must understand what they need to do. There must be assurances that the resources (human, physical, and fiscal) to complete the tasks are available. Motivation and incentive systems should be set up. Systems to coordinate efforts and guide activity must be devised and installed. An information management system must be designed to manage and analyze data and ensure that appropriate data are collected. This will aid managers in assessing whether individual activities or actions are tracking with stated goals and objectives. Training programs to improve managerial and worker capability in making and implementing plans should be designed. Managerial leadership to guide the efforts of all individuals in achieving the goals of the anadromous and resident fish recovery must be developed. It is the entire process of managing fish recovery in relationship to the Biological Opinion that will guide, coordinate, motivate, and control work and determine the effectiveness and efficiency of plan implementation.

  14. Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1988.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1987-10-01

    The FY 1988 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1988. The Work Plan focuses on individual Action Items found in the amended Program for which Bonneville Power Administration (BPA) has determined it has authority and responsibility to implement. The FY 1988 Work Plan emphasizes continuation of 95 ongoing projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. These continuing activities are summarized briefly by Program area: (1) mainstem passage; (2) artificial propagation; (3) natural propagation; (4) resident fish and wildlife; and (5) planning activities.

  15. PowerPoint Presentation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... CLEARWATER RESERVOIR MISSOURI ARKANSAS Lock and Dam No 1 10 CACHE RIVER LEGEND EXISTING ... Little Rock District, Southwestern Division Pine Mountain Dam * Authorized in 1965 and ...

  16. H.R. 599: A Bill to provide for the reconstitution of outstanding repayment obligations of the Administrator of the Bonneville Power Administration for the appropriated capital investments in the Federal Columbia River Power System. Introduced in the House of Representatives, One Hundred Fourth Congress, First session

    SciTech Connect (OSTI)

    1995-12-31

    This bill proposes to give the administrator of the Bonneville Power Administration the rights to refinance certain capital investments in the Federal Columbia River Power System. The act spells out how to distinguish old and new capital investments, how new principal amounts for old investments are calculated, interest rates and repayment dates. It also deals with interest rates for new capital investments during and after construction, appropriations for the Colville Reservation Grand Coulee Dam Settlement Act, and suggested contract provisions regarding future contracts.

  17. Southwestern Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    December 7, 2012 Southwestern Helps Restore Power After Hurricane Sandy Southwestern Aids Sandy Recovery Line crews from Southwestern repair distribution lines in Tom's River, New ...

  18. Export Authorizations - Procedures | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Export Authorizations - Procedures Export Authorizations - Procedures Part II, Section 202(e) of the Federal Power Act (FPA) states that exports of electric energy should be allowed unless the proposed export would impair the sufficiency of electric power supply within the U.S. or would impede or tend to impede the coordinated use of the U.S. power supply network. Based on these guidelines, DOE will grant authorization to export electric energy if it is determined that: 1.Sufficient generating

  19. Savannah River

    Broader source: Energy.gov [DOE]

    Following are compliance agreements for the Savannah River Site. Also included are short summaries of the agreements.

  20. EVALUATION OF THE EMISSION, TRANSPORT, AND DEPOSITION OF MERCURY, FINE PARTICULATE MATTER, AND ARSENIC FROM COAL-BASED POWER PLANTS IN THE OHIO RIVER VALLEY REGION

    SciTech Connect (OSTI)

    Kevin Crist

    2004-10-02

    Ohio University, in collaboration with CONSOL Energy, Advanced Technology Systems, Inc (ATS) and Atmospheric and Environmental Research, Inc. (AER) as subcontractors, is evaluating the impact of emissions from coal-fired power plants in the Ohio River Valley region as they relate to the transport and deposition of mercury, arsenic, and associated fine particulate matter. This evaluation will involve two interrelated areas of effort: ambient air monitoring and regional-scale modeling analysis. The scope of work for the ambient air monitoring will include the deployment of a surface air monitoring (SAM) station in southeastern Ohio. The SAM station will contain sampling equipment to collect and measure mercury (including speciated forms of mercury and wet and dry deposited mercury), arsenic, particulate matter (PM) mass, PM composition, and gaseous criteria pollutants (CO, NOx, SO{sub 2}, O{sub 3}, etc.). Laboratory analysis of time-integrated samples will be used to obtain chemical speciation of ambient PM composition and mercury in precipitation. Near-real-time measurements will be used to measure the ambient concentrations of PM mass and all gaseous species including Hg{sup 0} and RGM. Approximately of 18 months of field data will be collected at the SAM site to validate the proposed regional model simulations for episodic and seasonal model runs. The ambient air quality data will also provide mercury, arsenic, and fine particulate matter data that can be used by Ohio Valley industries to assess performance on multi-pollutant control systems. The scope of work for the modeling analysis will include (1) development of updated inventories of mercury and arsenic emissions from coal plants and other important sources in the modeled domain; (2) adapting an existing 3-D atmospheric chemical transport model to incorporate recent advancements in the understanding of mercury transformations in the atmosphere; (3) analyses of the flux of Hg{sup 0}, RGM, arsenic, and fine

  1. Evaluation of the Emission, Transport, and Deposition of Mercury and Fine Particulate Matter from Coal-Based Power Plants in the Ohio River Valley Region

    SciTech Connect (OSTI)

    Kevin Crist

    2008-12-31

    As stated in the proposal: Ohio University, in collaboration with CONSOL Energy, Advanced Technology Systems, Inc (ATS) and Atmospheric and Environmental Research, Inc. (AER) as subcontractors, evaluated the impact of emissions from coal-fired power plants in the Ohio River Valley region as they relate to the transport and deposition of mercury and associated fine particulate matter. This evaluation involved two interrelated areas of effort: ambient air monitoring and regional-scale modeling analysis. The scope of work for the ambient air monitoring included the deployment of a surface air monitoring (SAM) station in southeastern Ohio. The SAM station contains sampling equipment to collect and measure mercury (including speciated forms of mercury and wet and dry deposited mercury), particulate matter (PM) mass, PM composition, and gaseous criteria pollutants (CO, NOx, SO2, O3, etc.). Laboratory analyses of time-integrated samples were used to obtain chemical speciation of ambient PM composition and mercury in precipitation. Nearreal- time measurements were used to measure the ambient concentrations of PM mass and all gaseous species including Hg0 and RGM. Approximately 30 months of field data were collected at the SAM site to validate the proposed regional model simulations for episodic and seasonal model runs. The ambient air quality data provides mercury, and fine particulate matter data that can be used by Ohio Valley industries to assess performance on multi-pollutant control systems. The scope of work for the modeling analysis includes (1) development of updated inventories of mercury emissions from coal plants and other important sources in the modeled domain; (2) adapting an existing 3-D atmospheric chemical transport model to incorporate recent advancements in the understanding of mercury transformations in the atmosphere; (3) analyses of the flux of Hg0, RGM, and fine particulate matter in the different sectors of the study region to identify key transport

  2. The Savannah River Site (SRS) is located in south-central South...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for the Performance Assessment for the F-Tank Farm at the Savannah River Site February 2012 Prepared by: Savannah River Remediation LLC Closure and Waste Disposal Authority ...

  3. New York Power Authority | Open Energy Information

    Open Energy Info (EERE)

    Yes Activity Distribution Yes Activity Buying Distribution Yes Activity Wholesale Marketing Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes This article is a stub. You can...

  4. Update 3 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant, Modeling Units 1 and 4 Together

    Broader source: Energy.gov [DOE]

    Docket No. EO-05-01. Docket No. EO-05-01. This report describes dispersion modeling performed for Units 1 and 4 at Mirant's Potomac River Generating Station. The purpose of the modeling was to...

  5. Salt Waste Disposal at the Savannah River Site | Department of...

    Office of Environmental Management (EM)

    Salt Waste Disposal at the Savannah River Site Salt Waste Disposal at the Savannah River Site Section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal ...

  6. City of Wood River, Nebraska (Utility Company) | Open Energy...

    Open Energy Info (EERE)

    City of Wood River, Nebraska (Utility Company) Jump to: navigation, search Name: Wood River Municipal Power Place: Nebraska Phone Number: 308.583-2515; 308-583-2066 Website:...

  7. Disposal Authorization Statement

    Broader source: Energy.gov [DOE]

    The Saltstone Disposal Facility (SDF) is authorized to operate under this Disposal Authorization Statement (DAS) (Revision 1).  The revised DAS requirements ensure the facility does not pose a...

  8. About Us - Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Volume One Film Collection Volume Two 75th Anniversary Hydropower in the Northwest Woody Guthrie Videos Strategic Direction Branding & Logos Power of the River History Book...

  9. Hydroelectric power provides a cheap source of electricity with few carbon emissions. Yet, reservoirs are not operated sustainably, which we define as meeting societal needs for water and power while protecting long-term health of the river ecosystem. Reservoirs that generate hydropower are typically operated with the goal of maximizing energy reve

    SciTech Connect (OSTI)

    Jager, Yetta; Smith, Brennan T

    2008-02-01

    Hydroelectric power provides a cheap source of electricity with few carbon emissions. Yet, reservoirs are not operated sustainably, which we define as meeting societal needs for water and power while protecting long-term health of the river ecosystem. Reservoirs that generate hydropower are typically operated with the goal of maximizing energy revenue, while meeting other legal water requirements. Reservoir optimization schemes used in practice do not seek flow regimes that maximize aquatic ecosystem health. Here, we review optimization studies that considered environmental goals in one of three approaches. The first approach seeks flow regimes that maximize hydropower generation, while satisfying legal requirements, including environmental (or minimum) flows. Solutions from this approach are often used in practice to operate hydropower projects. In the second approach, flow releases from a dam are timed to meet water quality constraints on dissolved oxygen (DO), temperature and nutrients. In the third approach, flow releases are timed to improve the health of fish populations. We conclude by suggesting three steps for bringing multi-objective reservoir operation closer to the goal of ecological sustainability: (1) conduct research to identify which features of flow variation are essential for river health and to quantify these relationships, (2) develop valuation methods to assess the total value of river health and (3) develop optimal control softwares that combine water balance modelling with models that predict ecosystem responses to flow.

  10. Akenti Authorization System

    Energy Science and Technology Software Center (OSTI)

    2000-06-01

    Akenti is an authorization service for distributed resources. The authorization policy is kept in distributed certificates signed by one or more stakeholders for the resources. The package consists of the following components: Java GUI tools to create and sign the policy certificates C++ libraries to do make acess decisions based on the policy certificates A standalone authorization server that make access decisions C interfaces to the libraries and server

  11. Legal Authorities for UESC

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Authorities for UESC Hosted by: FEDERAL UTILITY PARTNERSHIP WORKING GROUP SEMINAR November 5-6, 2014 Cape Canaveral. Florida General UESC Authority * 42 U.S.C. § 8256(c) - Incentives for Agencies * Agencies may accept any financial incentive, goods, or services generally available from any utility * GSA recognizes financing as an authorized incentive * Guarantee: Savings v. Performance Federal Utility Partnership Working Group November 5-6, 2014 Cape Canaveral, FL Department of Defense

  12. MEMORANDUM FOR SCOTI L. SAMUELSON MANAGER OFFICE OF RIVER PROTE...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    c7 SUBJECT: ENVIRONMENTAL MANAGEMENT Delegation of Acquisition Executive Authority for Capital Asset Projects at Office of River Protection In accordance with the guidelines of...

  13. Terrestrial Carbon Inventory at the Savannah River Site, 1951 – 2001.

    SciTech Connect (OSTI)

    US Forest Service - Annonymous,

    2012-02-01

    A Power Point slide presentation/report on the terestrial carbon inventory at the Savannah River Site.

  14. Malheur River Wildlife Mitigation Project, Annual Report 2003.

    SciTech Connect (OSTI)

    Ashley, Paul

    2004-01-01

    Hydropower development within the Columbia and Snake River Basins has significantly affected riparian, riverine, and adjacent upland habitats and the fish and wildlife species dependent upon them. Hydroelectric dams played a major role in the extinction or major loss of both anadromous and resident salmonid populations and altered instream and adjacent upland habitats, water quality, and riparian/riverine function. Hydroelectric facility construction and inundation directly affected fish and wildlife species and habitats. Secondary and tertiary impacts including road construction, urban development, irrigation, and conversion of native habitats to agriculture, due in part to the availability of irrigation water, continue to affect wildlife and fish populations throughout the Columbia and Snake River Basins. Fluctuating water levels resulting from facility operations have created exposed sand, cobble, and/or rock zones. These zones are generally devoid of vegetation with little opportunity to re-establish riparian plant communities. To address the habitat and wildlife losses, the United States Congress in 1980 passed the Pacific Northwest Electric Power Planning and Conservation Act (Act) (P.L. 96-501), which authorized the states of Idaho, Montana, Oregon, and Washington to create the Northwest Power Planning Council (Council). The Act directed the Council to prepare a program in conjunction with federal, state, and tribal wildlife resource authorities to protect, mitigate, and enhance fish and wildlife species affected by the construction, inundation and operation of hydroelectric dams in the Columbia River Basin (NPPC 2000). Under the Columbia Basin Fish and Wildlife Program (Program), the region's fish and wildlife agencies, tribes, non-government organizations (NGOs), and the public propose fish and wildlife projects that address wildlife and fish losses resulting from dam construction and subsequent inundation. As directed by the Council, project proposals are

  15. Bonneville Project Act, Federal Columbia River Transmission System Act and Other Related Legislation.

    SciTech Connect (OSTI)

    Not Available

    1985-01-01

    Legislative texts are provided for: Bonneville Project Act which authorizes the completion, maintenance, and operation of Bonneville project for navigation, and for other purposes; Federal Columbia River Transmission system Act which enables the Secretary of the Interior to provide for operation, maintenance, and continued construction of the Federal transmission system in the Pacific Northwest by use of the revenues of the Federal Columbia River Power System and the proceeds of revenue bonds, and for other purposes; public law 88--552 which guarantees electric consumers of the Pacific Northwest first call on electric energy generated at Federal hydroelectric plants in that regions and reciprocal priority, and for other purposes; and public law 78--329 which provides for the partial construction of the Hungary Horse Dam on the South Fork of the Flathead River in the state of Montana, and for other purposes

  16. PowerPoint Presentation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Federal Columbia River Power System (FCRPS) FY 2013 THIRD QUARTER REVIEW Net Revenues and Reserves July 26, 2013 Projection for FY 2013 Page 2 This information has been made...

  17. CBR-1-H Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CBR-1-H Wholesale Power Rate Schedule CBR-1-H Wholesale Power Rate Schedule Area: Big Rivers and Henderson, KY System: CU This rate schedule shall be available to Big Rivers ...

  18. Potomac River Project Outage Schedule Clarification | Department...

    Office of Environmental Management (EM)

    Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) evised plan for transmission outages for the 230 kV circuits ...

  19. Columbia River Treaty 2014/2024 Review Phase 1 Report

    SciTech Connect (OSTI)

    2010-07-01

    Under the Columbia River Treaty (Treaty or CRT) of 1964, Canada and the United States (U.S.) jointly regulate and manage the Columbia River as it flows from British Columbia into the U.S. The Treaty has provided substantial flood control and power generation benefits to both nations. The Treaty established Canadian and U.S. Entities as implementing agents for each government. British Columbia Hydro and Power Authority (BC Hydro) was designated as the Canadian Entity. The Bonneville Power Administration (BPA) Administrator and the U.S. Army Corps of Engineers (Corps) Division Engineer, Northwestern Division, were designated as the U.S. Entity. The Canadian and U.S. Entities are empowered by their respective governments with broad discretion to implement the existing Columbia River Treaty. They are not, however, authorized to terminate, renegotiate, or otherwise modify the Treaty. In the U.S., authority over international treaties rests with the President, assisted in foreign relations and international negotiations by the Department of State and subject in certain cases to the advice and consent of the U.S. Senate. In Canada, international treaties are within the prerogative of the executive branch of the federal government. Under current policy, treaties are tabled in the House of Commons, and are subject to a waiting period before the executive branch brings the treaty into effect. In the case of the Columbia River Treaty, Canada has assigned certain rights and obligations relating to the Treaty to British Columbia pursuant to the Canada-B.C. Agreement. The Phase 1 report is provided to those respective governmental bodies to support possible independent and/or joint decisions that may be made with respect to the future of the Treaty. The Treaty contains two important provisions that take effect on and after September 16, 2024, that could impact the current power and flood control benefits: 1. Canadian flood control obligations automatically change from a pre

  20. PIA - Savannah River Operations Office Executive Commitment Action Tracking

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    System | Department of Energy Operations Office Executive Commitment Action Tracking System PIA - Savannah River Operations Office Executive Commitment Action Tracking System PIA - Savannah River Operations Office Executive Commitment Action Tracking System PIA - Savannah River Operations Office Executive Commitment Action Tracking System (2.9 MB) More Documents & Publications PIA - GovTrip (DOE data) PIA - Bonneville Power Adminstration Ethics Helpline

  1. Yakima River Basin Fish Passage Phase II Fish Screen Construction, Project Completion Report.

    SciTech Connect (OSTI)

    Hudson, R. Dennis

    2008-01-01

    On December 5, 1980, Congress passed the Pacific Northwest Electric Power Planning and Conservation Act (Public Law 96-501). The Act created the Northwest Power Planning Council (now the Northwest Power and Conservation Council). The Council was charged with the responsibility to prepare a Regional Conservation and Electric Power Plan and to develop a program to protect, mitigate, and enhance fish and wildlife including related spawning grounds and habitat on the Columbia River and its tributaries. The Council adopted its Fish and Wildlife Program on November 15, 1982. Section 800 of the Program addresses measures in the Yakima River Basin. The Yakima measures were intended to help mitigate hydroelectric impacts in the basin and provide off-site mitigation to compensate for fish losses caused by hydroelectric project development and operations throughout the Columbia River Basin. The Bonneville Power Administration (BPA) was designated as a major source of funding for such off-site mitigation measures and was requested to initiate discussions with the appropriate Federal project operators and the Council to determine the most expeditious means for funding and implementing the program. The primary measures proposed for rapid implementation in the Yakima River basin were the installation of fish passage and protective facilities. Sec. 109 of The Hoover Power Plant Act of 1984, authorized the Secretary of the Interior to design, construct, operate, and maintain fish passage facilities within the Yakima River Basin. Under Phase I of the program, improvements to existing fish passage facilities and installation of new fish ladders and fish screens at 16 of the largest existing diversion dams and canals were begun in 1984 and were completed in 1990. The Yakima Phase II fish passage program is an extension of the Phase I program. In 1988, the Yakama Nation (YN) submitted an application to amend Sections 803(b) and 1403(4.5) of the Northwest Power and Conservation Council

  2. Microsoft PowerPoint - SWL HPConf2010 (final).pptx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... WHITE RIVER NATIONAL0 WILDLIFE REFUGE Lock and Dam No 1 Little Rock District, Southwestern ... Pine Mountain Dam * Authorized in 1965 and reevaluated in 1980 * Authorized plan includes ...

  3. Ecotoxicology | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Savannah River NERP Research Opportunities Field Sites / Data Research Facilities Low Dose Irradiation Facility Tritium Irrigation Facility Microsatellite Development Education Graduate Undergraduate Radioecology Curriculum Outreach Outreach Program SREL Herpetology Information for Visitors SREL Conference Center Maps and Directions Airports and Lodging Security Requirements Reprints Employment Make a Gift University of Georgia logo University of Georgia search SREL GO powered by Google

  4. Smith River Rancheria- 2005 Project

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Smith River Rancheria located just south of the Oregon border, on the coast, knows that developing a power-generation facility is a crucial part of its multifaceted plan for both economic development and reduction of energy costs. The activities associated with this grant will include the basic steps necessary to determine whether a generation facility will, in fact, benefit the tribe.

  5. Wholesale Power Rate Schedules | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Power Rate Schedules October 1, 2011 CBR-1-H Wholesale Power Rate Schedule Area: Big Rivers and Henderson, KY System: CU October 1, 2011 CM-1-H Wholesale Power Rate...

  6. PP-41 Mirias River Electric Cooperative, Inc. | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 Mirias River Electric Cooperative, Inc. PP-41 Mirias River Electric Cooperative, Inc. Presidential Permit authorizing Mirias River Electric Cooperative, Inc. to constuct, operate, and maintain electric transmission facilities at the U.S.- Canada Border. PP-41 Mirias River Electric Cooperative, Inc. (575.76 KB) More Documents & Publications PP-42 Roseau Electric Cooperative, Inc. PP-67 North Central Electric Cooperative, Inc. PP-69 Vermont

  7. Microsoft PowerPoint - Bryan Hydro Conf 11 Jun 09.ppt

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    power, regulation of Red River flows, improvement of navigation, and recreation. ... Exceeded compliance goals. 4-year averages exceed compliance goals. - Red River: 625 ...

  8. EA-1981: Bonneville-Hood River Transmission Line Rebuild, Multnomah and Hood River Counties, Oregon

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration (BPA) is preparing an EA to assess potential environmental impacts of a proposal to rebuild its 24-mile long, 115 kilovolt Bonneville-Hood River transmission line. The existing line runs between the Bonneville Powerhouse at Bonneville Dam in Multnomah County, Oregon, and BPA's existing Hood River Substation in Hood River County, Oregon. The project would include replacing structures and conductor wires, improving access roads, and constructing new access roads or trails where needed.

  9. Enhanced BPA Balancing Authority (EBBA)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Expand Finance & Rates Involvement & Outreach Expand Involvement & Outreach Doing Business Expand Doing Business Skip navigation links Initiatives Columbia River Treaty Non...

  10. FFTF Authorization Agreement

    SciTech Connect (OSTI)

    DAUTEL, W.A.

    2000-02-25

    The purpose of the Authorization Agreement is to serve as a mechanism whereby the U.S. Department of Energy, Richland Operations Office (RL) and Fluor Hanford (FH) jointly clarify and agree to key conditions for conducting work safely and efficiently.

  11. Work Authorization System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-04-21

    To establish a work authorization and control process for work performed by designated site and facility management contractors, and other contractors as determined by the procurement executive, consistent with the budget execution and program evaluation requirements of the Department of Energy's (DOE's) Planning, Programming, Budgeting, and Evaluation process. Cancels DOE O 412.1.

  12. Site authorization service (SAZ)

    SciTech Connect (OSTI)

    Dane Skow; Igor Mandrichenko; Vijay Sehkri

    2003-10-01

    In this paper the authors present a methodology to provide an additional level of centralized control for the grid resources. This centralized control is applied to site-wide distribution of various grids and thus provides an upper hand in the maintenance.

  13. Work Authorization System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-04-21

    To establish a work authorization and control process for work performed by designated site and facility management contractors, and other contractors as determined by the procurement executive, consistent with the budget execution and program evaluation requirements of the Department of Energy's Planning, Programming, Budgeting, and Evaluation process. Admin Chg 1, dated 5-21-2014, cancels DOE O 412.1A.

  14. Work Authorization System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-04-20

    It establishes a work authorization and control process for work performed by designated management and operating (M&O), management and integrating (M&I), environmental restoration management contracts (ERMC) and other contracts determined by the Procurement Executive (hereafter referred to as M&O contractors). Cancels DOE O 5700.7C. Canceled by DOE O 412.1A.

  15. Re: Potomac River Generating Station Department of Energy Case...

    Energy Savers [EERE]

    Advanced Notice of Power Outages. Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: Advanced Notice of Power Outages. Docket No. EO-05-01. Order No. ...

  16. National Training and Education Resource Advanced Authoring Training

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Advanced Authoring Training Participant Guide NTER Advanced Authoring Training Participant Guide (03/2012 pw) 2 Contents OBJECTIVES ......................................................................................................................................... 3 HOW TO IMPORT POWERPOINT INTO NTER .................................................................................. 4 Several Ways to import PowerPoint

  17. Export Authorizations | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Export Authorizations Export Authorizations Below is a listing of export authorizations ... Avista 051203 EA-105-A NorAm Energy Services 082198 EA-106 Arizona Public Service ...

  18. "Title","Creator/Author","Publication Date","OSTI Identifier...

    Office of Scientific and Technical Information (OSTI)

    Valley Authority, Knoxville, TN (United States)","20 FOSSIL-FUELED POWER PLANTS; 32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION; 42 ENGINEERING NOT INCLUDED IN OTHER...

  19. Sandia National Laboratories Experts Co-Author DOE Reports on...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Experts Co-Author DOE Reports on Grid Integration and Concentrating Solar Power - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & ...

  20. FFTF Authorization Agreement

    SciTech Connect (OSTI)

    DAUTEL, W.A.

    2000-09-25

    The purpose of the Authorization Agreement is to serve as a mechanism whereby the U.S. Department of Energy, Richland Operations Office (RL) and Fluor Hanford (FH) jointly clarify and agree to key conditions for conducting work safely and efficiently in the Fast Flux Test Facility (FFTF). Work must be accomplished in a manner that achieves high levels of quality while protecting the environment and the safety and health of workers and the public, and complying with applicable contractual and regulatory requirements. It is the intent of this Agreement to address those items of significant importance in establishing and supporting the FFTF Authorization Envelope, but this Agreement in no way alters the terms and conditions of the Project Hanford Management Contract (PHMC), Contract Number DE-AC06-96RL13200.

  1. PP-10 Bonneville Power Administrator | Department of Energy

    Energy Savers [EERE]

    Bonneville Power Administrator PP-10 Bonneville Power Administrator Presidential permit authorizing Bonneville Power Administrator to construct, operate, and maintain electric ...

  2. PP-36 Bonneville Power Administration | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bonneville Power Administration PP-36 Bonneville Power Administration Presidential Permit authorizing Bonneville Power Administration to construct, operate, and maintain electric ...

  3. The Columbia Americas Greatest Power Stream

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Volume One Film Collection Volume Two 75th Anniversary Hydropower in the Northwest Woody Guthrie Videos Strategic Direction Branding & Logos Power of the River History Book...

  4. Grays River Watershed Geomorphic Analysis

    SciTech Connect (OSTI)

    Geist, David R.

    2005-04-30

    This investigation, completed for the Pacific Northwest National Laboratory (PNNL), is part of the Grays River Watershed and Biological Assessment commissioned by Bonneville Power Administration under project number 2003-013-00 to assess impacts on salmon habitat in the upper Grays River watershed and present recommendations for habitat improvement. This report presents the findings of the geomorphic assessment and is intended to support the overall PNNL project by evaluating the following: 􀂃 The effects of historical and current land use practices on erosion and sedimentation within the channel network 􀂃 The ways in which these effects have influenced the sediment budget of the upper watershed 􀂃 The resulting responses in the main stem Grays River upstream of State Highway 4 􀂃 The past and future implications for salmon habi

  5. Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Assessment of Radionuclide Monitoring in the CSRA Savannah River NERP Research ... Upcoming Seminars The Savannah River Ecology Laboratory is a research unit of the ...

  6. Bonneville Power Administration- The Power of The Columbia

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Power of the Columbia Our site is here to showcase the mighty Columbia River. We'll explore some of the history, beauty and magnificence of the northwest's great natural resource,...

  7. EA-337 Synergy Power Marketing, Inc. | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7 Synergy Power Marketing, Inc. EA-337 Synergy Power Marketing, Inc. Order authorizing Synergy Power Marketing, Inc to export electric energy to Canada EA-337 Synergy Power ...

  8. State authorization manual. Volume 1

    SciTech Connect (OSTI)

    Brugler-Jones, S.

    1990-10-01

    The State Authorization Manual (SAM) (Vol. I) provides guidance for States applying for program revisions to their authorized RCRA State program. The SAM is an updated version of the 1988 State Consolidated RCRA Authorization Manual (SCRAM). It focuses on program revision applications rather than initial applications since most States have received initial authorization for the RCRA program. The SCRAM should continue to be used to assist States not yet authorized under the RCRA program.

  9. Power Purchase Agreement Webinars

    Broader source: Energy.gov [DOE]

    Provides a listing of past power purchase agreement webinars and associated files. Author: U. S. Department of Energy, Energy Efficiency & Renewable Energy

  10. Solar Power Purchase Agreements

    Broader source: Energy.gov [DOE]

    Provides an overview of solar power purchase agreements including how they work, benefits and challenges and eligibility. Author: United States Environmental Protection Agency (EPA)

  11. Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) Concerning Planned Outages of the 230 kV circuits

    Office of Energy Efficiency and Renewable Energy (EERE)

    Docket No. EO-05-01. Order No. 202-07-02: Pursuant to the Department of Energy's Order No. 202-05-3 issued December 20, 2005 ("DOE Potomac River Order"), Pepco has filed notice of the planned...

  12. Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) Concerning Planned Outages of the 230 kV circuits

    Broader source: Energy.gov [DOE]

    Docket EO-05-01: Pursuant to the United States Department of Energy ("DOE") Order No. 202-05-3, issued December 20, 2005 ("DOE Potomac River Order") Pepco hereby files this revised notice of the...

  13. EIS-0241-SA-01: Supplement Analysis for the Hood River Fisheries...

    Broader source: Energy.gov (indexed) [DOE]

    Fisheries Project The project is consistent with the Northwest Power Planning Council's Fish and Wildlife Program, as well as BPA's Hood River Fisheries Project EIS (DOEEIS-0241)...

  14. RiverHeath: Neighborhood Loop Geothermal Exchange System (Technical...

    Office of Scientific and Technical Information (OSTI)

    The flowing water provides a tremendous amount of heat transfer. As a result, the ... RiverHeath will serve as a template for other projects adjacent to the water. Authors: ...

  15. Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    in 1997 and replaced with two other areas, both located in the Savannah River swamp. ... on the natural levy that parallels the Savannah River. Area: 1 2 3 4 5 6 7 8 9 10 11 ...

  16. River Corridor - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    River Corridor Richland Operations Office Richland Operations Office River Corridor B Reactor 300 Area 324 Building 618-10 and 618-11 Burial Grounds C Reactor D and DR Reactors F ...

  17. River Corridor Achievements

    Broader source: Energy.gov [DOE]

    Washington Closure Hanford and previous contractors have completed much of the cleanup work in the River Corridor, shown here.

  18. Free Flow Power Partners to Improve Hydrokinetic Turbine Performance and Cost

    Broader source: Energy.gov [DOE]

    Free Flow Power is working to enable American utilities to generate power from river sites not suited to conventional hydropower generation.

  19. EERE Success Story—Free Flow Power Partners to Improve Hydrokinetic Turbine Performance and Cost

    Office of Energy Efficiency and Renewable Energy (EERE)

    Free Flow Power is working to enable American utilities to generate power from river sites not suited to conventional hydropower generation.

  20. Tank Farms at the Savannah River Site | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Tank Farms at the Savannah River Site Tank Farms at the Savannah River Site Section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005 authorizes the Secretary of Energy, in consultation with the Nuclear Regulatory Commission, to reclassify certain waste from reprocessing spent nuclear fuel from high-level waste to low-level waste if it meets the criteria set forth in Section 3116. A Waste Determination Basis (WD Basis) provides the analysis to document the

  1. AUTHORITY

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Considerations Educational Institutions 92-2R 040893 Foreign Ownership, Control or Influence 92-3 051292 Contract Administration 92-5R 100192 Workplace Substance Abuse...

  2. Re: Potomac River Generating Station Department of Energy, Case...

    Broader source: Energy.gov (indexed) [DOE]

    Company (PEPCO) Concerning Planned Outages of the 230 kV circuits Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: Advanced Notice of Power Outages.

  3. Re: Potomac River Generating Station Department of Energy Case...

    Broader source: Energy.gov (indexed) [DOE]

    Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: Advanced Notice of Power Outages. Comments on Department of Energy's Emergency Order To Resume Limited ...

  4. Re: Potomac River Generating Station Department of Energy, Case...

    Office of Environmental Management (EM)

    Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) evised plan for transmission outages for the 230 kV circuits ...

  5. Operating Plan of Mirant Potomac River, LLC in Compliance with...

    Broader source: Energy.gov (indexed) [DOE]

    Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: Advanced Notice of Power Outages. Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages

  6. PowerPoint Presentation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N BPA continues to invest into the Federal Columbia River Power System and Columbia. Each year, BPA pays off...

  7. FAQ for Case Study Authors

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reviews FAQ for Case Study Authors Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Documents and Background...

  8. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  9. Oklahoma Municipal Power Authority - Geothermal Heat Pump Rebate...

    Broader source: Energy.gov (indexed) [DOE]

    < Back Eligibility Commercial Industrial Residential Agricultural Savings Category Geothermal Heat Pumps Commercial Refrigeration Equipment Maximum Rebate 1,000ton Program Info...

  10. Guam Power Authority Smart Grid Project | Open Energy Information

    Open Energy Info (EERE)

    can install devices that assist in managing electricity use and costs, including in-home displays and home area networks. The new AMI and distribution automation technologies...

  11. Long Island Power Authority Smart Grid Demonstration Project...

    Open Energy Info (EERE)

    distribution and consumer systems, such as smart meters, distribution automation, distributed energy resources, and electric vehicle charging stations. The projecct will also...

  12. Microsoft PowerPoint - MVD Hydrokinetics, SW Regional Hydropower...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... BUILDING STRONG 9 Confidential Information of Free Flow Power Corporation II. 25 Projects on Lower Mississippi River 2009 2009 * FFP filed for Preliminary Permits in June * ...

  13. Hydro Power to Make the American Dream Come True

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Volume One Film Collection Volume Two 75th Anniversary Hydropower in the Northwest Woody Guthrie Videos Strategic Direction Branding & Logos Power of the River History Book...

  14. Power Builds Ships Northwest Hydropower Helps Win World War II

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Volume One Film Collection Volume Two 75th Anniversary Hydropower in the Northwest Woody Guthrie Videos Strategic Direction Branding & Logos Power of the River History Book...

  15. Water Power Forum | OpenEI Community

    Open Energy Info (EERE)

    Water Power Forum Home > Water Power Forum > Posts by term > Water Power Forum Content Group Activity By term Q & A Feeds Term: Water power Type Term Title Author Replies Last Post...

  16. Before the House Natural Resources Subcommittee on Water and Power

    Broader source: Energy.gov [DOE]

    Subject: Federal Power Marketing Administration Borrowing Authority 
By: Timothy J. Meeks Administrator, Western Area Power Administration

  17. Author for correspondence: Jennifer E

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    EVALUATION OF PHOTOVOLTAIC SYSTEM POWER RATING METHODS FOR A CADMIUM TELLURIDE ARRAY Nelson L 1 and Hansen C 2 1 First Solar, Oakland, California, USA 2 Sandia National Laboratories, Albuquerque, New Mexico, USA ABSTRACT A variety of metrics are commonly used to assess whether or not a photovoltaic ("PV") system is operating as expected, but to date no standard metric has been accepted. Three commonly used metrics for assessing PV system power performance are the Power Performance

  18. Office of River Protection - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Office of River Protection Office of River Protection Office of River Protection Office of River Protection Email Email Page | Print Print Page |Text Increase Font Size Decrease...

  19. Raft River Geothermal Area Data Models - Conceptual, Logical and Fact Models

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Cuyler, David

    2012-07-19

    Conceptual and Logical Data Model for Geothermal Data Concerning Wells, Fields, Power Plants and Related Analyses at Raft River a. Logical Model for Geothermal Data Concerning Wells, Fields, Power Plants and Related Analyses, David Cuyler 2010 b. Fact Model for Geothermal Data Concerning Wells, Fields, Power Plants and Related Analyses, David Cuyler 2010 Derived from Tables, Figures and other Content in Reports from the Raft River Geothermal Project: "Technical Report on the Raft River Geothermal Resource, Cassia County, Idaho," GeothermEx, Inc., August 2002. "Results from the Short-Term Well Testing Program at the Raft River Geothermal Field, Cassia County, Idaho," GeothermEx, Inc., October 2004.

  20. Raft River Geothermal Area Data Models - Conceptual, Logical and Fact Models

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Cuyler, David

    Conceptual and Logical Data Model for Geothermal Data Concerning Wells, Fields, Power Plants and Related Analyses at Raft River a. Logical Model for Geothermal Data Concerning Wells, Fields, Power Plants and Related Analyses, David Cuyler 2010 b. Fact Model for Geothermal Data Concerning Wells, Fields, Power Plants and Related Analyses, David Cuyler 2010 Derived from Tables, Figures and other Content in Reports from the Raft River Geothermal Project: "Technical Report on the Raft River Geothermal Resource, Cassia County, Idaho," GeothermEx, Inc., August 2002. "Results from the Short-Term Well Testing Program at the Raft River Geothermal Field, Cassia County, Idaho," GeothermEx, Inc., October 2004.

  1. Work Authorization System | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Work Authorization System Work Authorization System PDF icon Work Authorization System More Documents & Publications Policy Flash 2014-30 DOE Order 412.1a, Work Authorization ...

  2. Natural Energy Laboratory of Hawaii Authority Partners with Sandia to

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Install Aquion EES Demo Natural Energy Laboratory of Hawaii Authority Partners with Sandia to Install Aquion EES Demo - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering

  3. Highlighting High Performance: Twenty River Terrace, Battery Park City, New York, New York

    SciTech Connect (OSTI)

    Not Available

    2002-08-01

    Case study on high performance building features of the Twenty River Terrace, Battery Park City building. Breezes off the Hudson River waft through Battery Park City, a planned development of residential and commercial buildings and open space at the tip of lower Manhattan. A riverfront walkway and several connecting public parks sprinkled with public art flank Battery Park City on one side, and New York's busy financial district vibrates on the other. Construction continues on Battery Park's newest building, Twenty River Terrace, the first residential apartment building to embrace sustainable design in a systematic way, and the first to follow the Hugh L. Carey Battery Park City Authority Residential Environmental Guidelines. According to the guidelines, which all future Battery Park City development must follow, they ''establish a process for the creation of environmentally responsible residential buildings that are appreciably ahead of current standards and practices for development.'' As a result of the guidelines, and the architects' commitment to incorporating best practices, this 27-story apartment building operates 35% more efficiently than required by the New York State Energy Code, and generates some of its own electricity from building-integrated photovoltaics, especially in the summer when New York power plants struggle to keep up with air-conditioning demands. The Authority hopes the guidelines will be a good model for other developments, in Manhattan and across the world, for incorporating energy-efficient design and renewable energy. The principles of environmentally sound, people-centered planning and development addressed by Twenty River Terrace continue to be a focus of the redevelopment of lower Manhattan.

  4. Savannah River National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Savannah River National Laboratory srnl.doe.gov SRNL is a DOE National Laboratory operated by Savannah River Nuclear Solutions. At a glance 'Tin whiskers' suppression method Researchers at the Savannah River National Laboratory (SRNL) have identified a treatment method that slows or prevents the formation of whiskers in lead-free solder. Tin whiskers spontaneously grow from thin films of tin, often found in microelectronic devices in the form of solders and platings. Background This problem was

  5. author | OpenEI Community

    Open Energy Info (EERE)

    data, and helpful information for OpenEI wiki authors Enabling developers to use energy web services on OpenEI, REEGLE.info, Data.gov and across the web. We help developers find...

  6. FAQ for Case Study Authors

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reviews » FAQ for Case Study Authors Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Documents and Background Materials FAQ for Case Study Authors BER Requirements Review 2015 ASCR Requirements Review 2015 Previous Reviews Requirements Review Reports Case Studies Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1 800-333-7638 (Inside US) 1 510-486-7600 (Globally) 1 510-486-7607 (Globally) Report Network Problems:

  7. Federal Authorities | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Authorities Federal Authorities DOE is the Sector Specific Agency (SSA) for Energy and within the Department ISER oversees all activities associated with the National Infrastructure Protection Plan (NIPP) and the Energy Sector Specific Plan (SSP). In doing so, ISER maintains a close partnership with the two Energy Sector Coordinating Councils (SCCs), the Electricity SCC and the Oil and Natural Gas SCC, and governmental partners through the Critical Infrastructure Protection Advisory

  8. Federal Power Act | Open Energy Information

    Open Energy Info (EERE)

    Regulatory commission) as the licensing authority certain interstate transmission and wholesale power sales and most hydroelectric power. Published NA Year Signed or Took Effect...

  9. Structure Learning in Power Distribution Networks (Technical...

    Office of Scientific and Technical Information (OSTI)

    Technical Report: Structure Learning in Power Distribution Networks Citation Details In-Document Search Title: Structure Learning in Power Distribution Networks Authors: Deka, ...

  10. REQUEST FOR RECORDS DISPOSITION AUTHORITY

    Office of Energy Efficiency and Renewable Energy (EERE)

    AEC – Power Reactor Records, Summaries of Data and Statistics Useful in the Control of Operations, Source Records Utilized in Compiling Summaries and Reports in Operations Control, II-NNA-2110

  11. EA-290 Ontario Power Generation, Inc. | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ontario Power Generation, Inc. EA-290 Ontario Power Generation, Inc. Order authorizing Ontario Power Generation, Inc. to export electric energy to Canada PDF icon EA-290 Ontario ...

  12. EA-196 Minnesota Power, Inc | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-196 Minnesota Power, Inc Order authorizing Minnesota Power, Inc to export electric energy to Canada. EA-196 Minnesota Power, Inc (33.61 KB) More Documents & Publications ...

  13. EA-200-A American Electric Power Service Corporation | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    -A American Electric Power Service Corporation EA-200-A American Electric Power Service Corporation Order authorizing American Electric Power Service Corporation to export electric ...

  14. EA-200 American Electric Power Service Corporation | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    200 American Electric Power Service Corporation EA-200 American Electric Power Service Corporation Order authorizing American Electric Power Service Corporation to export electric ...

  15. EA-236-A American Electric Power Service Corporation | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6-A American Electric Power Service Corporation EA-236-A American Electric Power Service Corporation Order authorizing American Electric Power Service Corporation to export ...

  16. EA-098 Western Systems Power Pool | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-098 Western Systems Power Pool Order authorizing Western Systems Power Pool to export electric energy to Canada PDF icon EA- 98 Western Systems Power Pool More Documents & ...

  17. PP-54 Ontario Hydro Electric Power Commission | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Ontario Hydro Electric Power Commission PP-54 Ontario Hydro Electric Power Commission Presidential Permit authorizing Ontario Hydro Electric Power Commission to construct, ...

  18. PP-13 Federal Power Commission | Department of Energy

    Office of Environmental Management (EM)

    3 Federal Power Commission PP-13 Federal Power Commission Presidential permit authorizing Federal Power Commission to construct, operate, and maintain electric transmission ...

  19. EA-345 New Brunswick Power Generation Corporation | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    New Brunswick Power Generation Corporation EA-345 New Brunswick Power Generation Corporation Order authorizing New Brunswick Power Generation Corporation to export electric energy ...

  20. EA-213 Coral Power, LLC | Department of Energy

    Office of Environmental Management (EM)

    Coral Power, LLC Order authorizing Coral Power, LLC to export electric energy to Canada. PDF icon EA-213 Coral Power, LLC More Documents & Publications EA-232 OGE Energy...

  1. EA-98-I Western Systems Power Pool | Department of Energy

    Energy Savers [EERE]

    Power Pool Order authorizing Western Systems Power Pool to export electric energy to Canada. PDF icon EA-98-I Western Systems Power Pool More Documents & Publications Application...

  2. Poster Title LA-UR Number Author(s) Thumbnail

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Water Individual Permit Posters 1 December 4, 2013 Poster Title LA-UR Number Author(s) Thumbnail Contributions of Nitrite-Nitrogen, Nitrate-Nitrogen, and Orthophosphate Levels in Surface Water Runoff from Wildfire Severity Classes from the Las Conchas Fire in the Jemez Mountains, New Mexico, 2012 July 2013 Student Symposium LA-UR-13-25819 Anita Lavadie Solid and Dissolved Phase Aluminum in Storm Water Runoff on the Pajarito Plateau July 2013 Student Symposium LA-UR-13-25505 Daria Cuthbertson

  3. Snake and Columbia Rivers Sediment Sampling Project

    SciTech Connect (OSTI)

    Pinza, M.R.; Word, J.Q; Barrows, E.S.; Mayhew, H.L.; Clark, D.R. )

    1992-12-01

    The disposal of dredged material in water is defined as a discharge under Section 404 of the Clean Water Act and must be evaluated in accordance with US Environmental Protection Agency regulation 40 CFR 230. Because contaminant loads in the dredged sediment or resuspended sediment may affect water quality or contaminant loading, the US Army Corps of Engineers (USACE), Walla Walla District, has requested Battelle/Marine Sciences Laboratory to collect and chemically analyze sediment samples from areas that may be dredged near the Port Authority piers on the Snake and Columbia rivers. Sediment samples were also collected at River Mile (RM) stations along the Snake River that may undergo resuspension of sediment as a result of the drawdown. Chemical analysis included grain size, total organic carbon, total volatile solids, ammonia, phosphorus, sulfides, oil and grease, total petroleum hydrocarbons, metals, polynuclear aromatic hydrocarbons, pesticides, polychlorinated biphenyls, and 21 congeners of polychlorinated dibenzodioxins and dibenzofurans.

  4. about Savannah River National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The EDM capability at the Savannah River National Laboratory (SRNL) is unique to the Savannah River Site. It allows for very fine, precise cutting of metal without destroying ...

  5. Emissions, Monitoring, and Control of Mercury from Subbituminous Coal-Fired Power Plants - Phase II

    SciTech Connect (OSTI)

    Alan Bland; Jesse Newcomer; Allen Kephart; Volker Schmidt; Gerald Butcher

    2008-10-31

    Western Research Institute (WRI), in conjunction with Western Farmers Electric Cooperative (WFEC), has teamed with Clean Air Engineering of Pittsburgh PA to conduct a mercury monitoring program at the WEFC Hugo plant in Oklahoma. Sponsored by US Department of Energy Cooperative Agreement DE-FC-26-98FT40323, the program included the following members of the Subbituminous Energy Coalition (SEC) as co-sponsors: Missouri Basin Power Project; DTE Energy; Entergy; Grand River Dam Authority; and Nebraska Public Power District. This research effort had five objectives: (1) determine the mass balance of mercury for subbituminous coal-fired power plant; (2) assess the distribution of mercury species in the flue gas (3) perform a comparison of three different Hg test methods; (4) investigate the long-term (six months) mercury variability at a subbituminous coal-fired power plant; and (5) assess operation and maintenance of the Method 324 and Horiba CEMS utilizing plant personnel.

  6. Instantaneous reactive power and power factor of instantaneous...

    Office of Scientific and Technical Information (OSTI)

    This provides a theoretical foundation for power quality monitoring, diagnostics, and compensation methods. Authors: Hsu, J.S. Publication Date: 1998-02-01 OSTI Identifier: 654174 ...

  7. Columbia River : Terminal Fisheries Research Report : Annual Report 1994.

    SciTech Connect (OSTI)

    Hirose, Paul; Miller, Marc; Hill, Jim

    1996-12-01

    In 1993 the Northwest Power Planning Council recommended in its Strategy for Salmon that terminal fishing sites be identified and developed. The Council called on the Bonneville Power Administration to fund a 10-year study to investigate the feasibility of creating and expanding terminal known stock fisheries in the Columbia River Basin.

  8. The Bowersock Mills and Power Company 1874

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Incremental Hydroelectric Energy The Bowersock Mills and Power Co., Lawrence, KS ... It comes from putting in better turbines in existing dams, it comes from run-of-the-river ...

  9. Savannah River Field Office | National Nuclear Security Administration |

    National Nuclear Security Administration (NNSA)

    (NNSA) Savannah River

  10. Water Power for a Clean Energy Future (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2010-07-01

    Water power technologies harness energy from rivers and oceans to generate electricity for the nation's homes and businesses, and can help the United States meet its pressing energy, environmental, and economic challenges. Water power technologies; fall into two broad categories: conventional hydropower and marine and hydrokinetic technologies. Conventional hydropower uses dams or impoundments to store river water in a reservoir. Marine and hydrokinetic technologies capture energy from waves, tides, ocean currents, free-flowing rivers, streams, and ocean thermal gradients.