National Library of Energy BETA

Sample records for river plant srp

  1. Objective and independent review system for SRP (Savannah River Plant) nonreactor facilities

    SciTech Connect (OSTI)

    Durant, W.S.

    1986-01-29

    The review system described in DPW-83-112 effectively provides objective and independent review for operation of SRP non-reactor nuclear facilities. Safe operation is ensured by trained personnel; an extensive system of Operational Safety Requirements, Technical Standards, written procedures and safety documents; incident investigation and reporting; and internal auditing. Implementation of DOE Order 5480.1A, Chapter V will be completed with issue of Operational Safety Requirements for all the non-reactor designated facilities in March 1986. 6 refs., 1 fig.

  2. Salt River Project SRP | Open Energy Information

    Open Energy Info (EERE)

    a percentage of its electricity from biomass plants. It is also involved in the solar power industry. Coordinates: 33.42551, -111.937419 Show Map Loading map......

  3. ENVIRONMENTAL SCIENCES; SAVANNAH RIVER PLANT; ENVIRONMENTAL EFFECTS...

    Office of Scientific and Technical Information (OSTI)

    5 audit of SRP radioactive waste Ashley, C. 05 NUCLEAR FUELS; 54 ENVIRONMENTAL SCIENCES; SAVANNAH RIVER PLANT; ENVIRONMENTAL EFFECTS; RADIOACTIVE EFFLUENTS; EMISSION; HIGH-LEVEL...

  4. SRP- Net Metering

    Broader source: Energy.gov [DOE]

    Note: Salt River Project (SRP) modified its existing net-metering program for residential customers in February 2015. These changes are effective with the April 2015 billing cycle.

  5. EIS-0082: Defense Waste Processing Facility, Savannah River Plant

    Broader source: Energy.gov [DOE]

    The Office of Defense Waste and Byproducts Management developed this EIS to provide environmental input into both the selection of an appropriate strategy for the permanent disposal of the high-level radioactive waste currently stored at the Savannah River Plant (SRP) and the subsequent decision to construct and operate a Defense Waste Processing Facility at the SRP site.

  6. Waterfowl of the Savannah River Plant: Comprehensive cooling water study. Final report

    SciTech Connect (OSTI)

    Mayer, J.J.; Kennamer, R.A.; Hoppe, R.T.

    1986-06-01

    Thirty-one species of waterfowl have been documented on the Savannah River Plant (SPR). The Savannah River Ecology Laboratory (SREL) has been conducting waterfowl research on the site for the past 15 years. This research has included work on waterfowl utilization of the SRP, wood duck reproductive biology, and waterfowl wintering ecology. Results are described.

  7. EIS-0121: Alternative Cooling Water Systems, Savannah River Plant, Aiken, South Carolina

    Broader source: Energy.gov [DOE]

    The purpose of this Environmental Impact Statement (EIS) is to provide environmental input into the selection and implementation of cooling water systems for thermal discharges from K– and C-Reactors and from a coal-fired powerhouse in the D-Area at the Savannah River Plant (SRP)

  8. EIS-0108: L-Reactor Operation, Savannah River Plant, Aiken, South Carolina

    Broader source: Energy.gov [DOE]

    This Environmental Impact Statement (EIS) was prepared to provide environmental input into the proposed decision to restart L-Reactor operation at the Savannah River Plant (SRP). The Savannah River Plant is a major U.S. Department of Energy (DOE) installation for the production of defense nuclear materials. The proposed restart of L–Reactor would provide defense nuclear materials (i.e. , plutonium) to wet current and near-term needs for national defense purposes.

  9. Emergency cooling simulation tests on an electrically heated channel typical of SRP (Savannah River Laboratory) reactor fuel channels - RIG B

    SciTech Connect (OSTI)

    Guerrero, H.N.

    1990-01-01

    Emergency cooling simulation tests were conducted on a single electrically heated test channel representative of Savannah River Plant fuel assembly flow channels. The primary objective was to investigate downflow, air-water hydraulic flow conditions that lead to the onset of a runaway thermal excursion in the range of superficial liquid and gas velocities, 1.4 m/sec and 1 m/sec, respectively. The thermal excursion power normalized by the power to reach fluid outlet saturation conditions, or R-factor, was found to decrease from values close to 2, at annular flow conditions to approximately 0.8 at low to zero void fractions. 3 refs., 9 figs.

  10. Environmental Survey preliminary report, Savannah River Plant, Aiken, South Carolina

    SciTech Connect (OSTI)

    Not Available

    1987-08-01

    This report contains the preliminary findings based on the first phase of an Environmental Survey at the Department of Energy (DOE) Savannah River Plant (SRP), located at Aiken, South Carolina. The Survey is being conducted by DOE's Office of Environment, Safety and Health. The following topics are discussed: general site information; air, soil, surface water and ground water; hydrogeology; waste management; toxic and chemical materials; release of tritium oxides; radioactivity in milk; contamination of ground water and wildlife; pesticide use; and release of radionuclides into seepage basins. 149 refs., 44 figs., 53 tabs.

  11. Defense waste salt disposal at the Savannah River Plant. [Cement-based waste form, saltstone

    SciTech Connect (OSTI)

    Langton, C A; Dukes, M D

    1984-01-01

    A cement-based waste form, saltstone, has been designed for disposal of Savannah River Plant low-level radioactive salt waste. The disposal process includes emplacing the saltstone in engineered trenches above the water table but below grade at SRP. Design of the waste form and disposal system limits the concentration of salts and radionuclides in the groundwater so that EPA drinking water standards will not be exceeded at the perimeter of the disposal site. 10 references, 4 figures, 3 tables.

  12. Releases of radioactivity at the Savannah River Plant, 1954--1985

    SciTech Connect (OSTI)

    Zeigler, C.C.; Lawrimore, I.B.

    1988-07-01

    Radioactive releases from Savannah River Plant (SRP) facilities to air, water and earthen seepage basins have been monitored and tabulated throughout the history of the site. The purpose of this report is to provide a source of data on routine releases of radioactivity to air, water and seepage basins that can be used for analyses of trends, environmental impact, etc. As used in this report, routine radioactive releases means radioactive materials that are released through established effluents from process facilities. This report is not intended to provide interpretation of the release values, their transport and impact or information on spills, leaks, buried waste or special use facilities. These subjects are covered in other SRP publications. This report provides a summary of radioactive releases that reflects the release values contained in records and documents from startup through 1985. Releases are tabulated in the following categories: Annual radioactive releases by emission source and radionuclide for 1954 through 1985; Annual radioactive releases by receptor medium and radionuclide for 1954 through 1985; Monthly releases by emission source and radionuclide for 1981 through 1985. The presentation of all SRP routine radioactive releases data in these categories provides a reference for historic data on SRP releases. 34 refs.

  13. EIS-0023: Long-Term Management of Defense High-Level Radioactive Wastes (Research and Development Program for Immobilization), Savannah River Plant, Aiken, South Carolina

    Broader source: Energy.gov [DOE]

    This environmental impact statement (EIS) analyzes the environmental implications of the proposed continuation of a large Federal research and development (R&D) program directed toward the immobilization of the high-level radioactive wastes resulting from chemical separations operations for defense radionuclides production at the DOE Savannah River Plant (SRP) near Aiken, South Carolina.

  14. SRP- Residential Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    SRP's Residential Energy Efficiency Rebate Program is designed to encourage residential SRP customers to utilize energy efficient appliances and measures at home. See program web site for a...

  15. Strontium Sorption onto SRP Soils

    SciTech Connect (OSTI)

    Hoeffner, S.L.

    2001-07-02

    This report discusses the effect of water and soil quality variables on the sorption of strontium onto SRP soils. The variables cover the range of conditions observed in the low-level waste burial ground.

  16. SRP RADIOACTIVE WASTE RELEASES S

    Office of Scientific and Technical Information (OSTI)

    . . . . . -- SRP RADIOACTIVE WASTE RELEASES S t a r t u p t h r o u g h 1 9 5 9 September 1 9 6 0 - R E C O R D - W O R K S T E C H N I C A L D E P A R T M E N T 1 J. E. C o l e , ...

  17. SRP- Business Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    SRP offers rebates to help SRP business customers manage energy usage and increase the energy efficiency of participating facilities. Within this program there are three types of rebates: Standard...

  18. Gengma County Tiechang River Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Gengma County Tiechang River Power Plant Jump to: navigation, search Name: Gengma County Tiechang River Power Plant Place: Lincang City, Yunnan Province, China Zip: 666100 Sector:...

  19. Zijin County East River Fengguang Likou Power Plant Development...

    Open Energy Info (EERE)

    Zijin County East River Fengguang Likou Power Plant Development Co Ltd Jump to: navigation, search Name: Zijin County East River Fengguang Likou Power Plant Development Co.Ltd...

  20. Code of Record Standard Review Plan (SRP) | Department of Energy

    Office of Environmental Management (EM)

    Code of Record Standard Review Plan (SRP) Code of Record Standard Review Plan (SRP) The objective of this Standard Review Plan (SRP) on Code of Record (COR) is to provide guidance ...

  1. SRP - Solar Water Heating Program | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    on SRCC rating) Summary NOTE: SRP no longer provides incentives for solar electric photovoltaic systems. SRP's Solar Electric Program provides incentives to its residential...

  2. 1969 AUDIT OF SRP RADIOACTIVE WASTE

    Office of Scientific and Technical Information (OSTI)

    969 AUDIT OF SRP RADIOACTIVE WASTE bY C . Ashley A p r i l 1970 Radiological Sciences ... CONTENTS Page I n t r o d u c t i o n . . . . . . . . . . . . . . . . . . . . . . . . 5 ...

  3. Savannah River Plant/Savannah River Laboratory radiation exposure report

    SciTech Connect (OSTI)

    Rogers, C.D.; Hyman, S.D.; Keisler, L.L. and Co., Aiken, SC . Savannah River Plant); Reeder, D.F.; Jolly, L.; Spoerner, M.T.; Schramm, G.R. and Co., Aiken, SC . Savannah River Lab.)

    1989-01-01

    The protection of worker health and safety is of paramount concern at the Savannah River Site. Since the site is one of the largest nuclear sites in the nation, radiation safety is a key element in the protection program. This report is a compendium of the results in 1988 of the programs at the Savannah River Plant and the Savannah River Laboratory to protect the radiological health of employees. By any measure, the radiation protection performance at this site in 1988 was the best since the beginning of operations. This accomplishment was made possible by the commitment and support at all levels of the organizations to reduce radiation exposures to ALARA (As Low As Reasonably Achievable). The report provides detailed information about the radiation doses received by departments and work groups within these organizations. It also includes exposure data for recent years to allow Plant and Laboratory units to track the effectiveness of their ALARA efforts. Many of the successful practices and methods that reduced radiation exposure are described. A new goal for personnel contamination cases has been established for 1989. Only through continual and innovative efforts to minimize exposures can the goals be met. The radiation protection goals for 1989 and previous years are included in the report. 27 figs., 58 tabs.

  4. Metal toxicity evaluation of Savannah River Plant saltstone comparison of EP and TCLP test results

    SciTech Connect (OSTI)

    Langton, C A

    1988-01-01

    Saltstone is the waste treatment and disposal concept for low-level defense waste at the Savannah River Plant. The waste is a sodium salt solution which has about 230 ..mu..CiL in addition to the hazardous characteristics of corrosivity and metal toxicity (Cr/sup +6/ > 100 ppM). Two EPA test procedures are routinely used at SRP to evaluate metal toxicity of wastes and wasteforms. 1) the Extraction Procedure (EP); and 2) the Toxicity Characterization Leaching Procedure (TCLP). The EP test is required by SCDHEC and EPA. The TCLP is used to evaluate the effect of increased surface area on metal leaching from the various SRP wasteforms. EP and TCLP test results are presented for two types of wasteforms, a cement-based saltstone and for a slag-based saltstone. The slag saltstone chemically stabilizes and also physically entraps the chromium. For waste solutions with low to intermediate metal concentrations (up to 5000 ppM), the TCLP extracts typically have lower metal values than the EP extracts. This is attributed to the faster neutralization of the acetic acid by the crushed TCLP sample. Crushing increases surface area and consequently releases more alkalinity from the wasteform matrix and the wasteform pore solution. Metal concentrations in the EP and TCLP extracts are proportional to the concentrations of metals in the pore solution for both the cement or slag-based wasteforms. The pore solution concentrations for cement wasteforms are directly related to the soluble metal concentration in the waste. The metal concentration in the slag wasteform pore solutions are significantly lower than the waste because these metals are reduced lower valences and precipitated as insoluble solid phases. 3 refs., 3 figs., 5 tabs.

  5. Safety analysis -- 200 Area Savannah River Plant, F-Canyon Operations. Supplement 4

    SciTech Connect (OSTI)

    Beary, M.M.; Collier, C.D.; Fairobent, L.A.; Graham, R.F.; Mason, C.L.; McDuffee, W.T.; Owen, T.L.; Walker, D.H.

    1986-02-01

    The F-Canyon facility is located in the 200 Separations Area and uses the Purex process to recover plutonium from reactor-irradiated uranium. The irradiated uranium is normally in the form of solid or hollow cylinders called slugs. These slugs are encased in aluminum cladding and are sent to the F-Canyon from the Savannah River Plant (SRP) reactor areas or from the Receiving Basin for Offsite Fuels (RBOF). This Safety Analysis Report (SAR) documents an analysis of the F-Canyon operations and is an update to a section of a previous SAR. The previous SAR documented an analysis of the entire 200 Separations Area operations. This SAR documents an analysis of the F-Canyon and is one of a series of documents for the Separations Area as specified in the Savannah River Implementation Plans. A substantial amount of the information supporting the conclusions of this SAR is found in the Systems Analysis. Some F-Canyon equipment has been updated during the time between the Systems Analysis and this SAR and a complete description of this equipment is included in this report. The primary purpose of the analysis was to demonstrate that the F-Canyon can be operated without undue risk to onsite or offsite populations and to the environment. In this report, risk is defined as the expected frequency of an accident, multiplied by the resulting radiological consequence in person-rem. The units of risk for radiological dose are person-rem/year. Maximum individual exposure values have also been calculated and reported.

  6. SRP- PowerWise Business Solutions Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    SRPBusiness Solutions is a program designed to help SRP business customers manage energy usage and increase the energy efficiency of participating facilities. Within this program there are several...

  7. Office of River Protection Prepares for Critical Waste Treatment Plant

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Testing | Department of Energy Prepares for Critical Waste Treatment Plant Testing Office of River Protection Prepares for Critical Waste Treatment Plant Testing May 16, 2016 - 12:40pm Addthis Workers remove the old test vessel from the Full-Scale Vessel Test Facility. Workers remove the old test vessel from the Full-Scale Vessel Test Facility. RICHLAND, Wash. - EM's Office of River Protection (ORP) removed a 30-ton stainless steel vessel to make way for a new one to fulfill a critical role

  8. Safety Design Strategy Standard Review Plan (SRP) | Department...

    Office of Environmental Management (EM)

    This SRP on Safety Design Strategy (SDS) provides the starting point for a set of corporate Performance Objectives and Criteria contain in Appendix A. Review teams are expected to ...

  9. Improved laboratory assays of Pu and U for SRP purification and finishing processes

    SciTech Connect (OSTI)

    Holland, M K; Dorsett, R S

    1986-01-01

    Significant improvements have been made in routine assay techniques for uranium and plutonium as part of an effort to improve accountability at the Savannah River Plant (SRP). Emphasis was placed on input/output accountability points and key physical inventory tanks associated with purification and finishing processes. Improvements were made in existing assay methods; new methods were implemented; and the application of these methods was greatly expanded. Prior to assays, samples were validated via density measurements. Digital density meters precise to four, five, and six decimal places were used to meet specific requirements. Improved plutonium assay techniques are now in routine use: controlled-potential coulometry, ion-exchange coulometry, and Pu(III) diode-array spectrophotometry. A new state-of-the-art coulometer was fabricated and used to ensure maximum accuracy in verifying standards and in measuring plutonium in product streams. The diode-array spectrophotometer for Pu(III) measurements was modified with fiber optics to facilitate remote measurements; rapid, precise measurements made the technique ideally suited for high-throughput assays. For uranium assays, the isotope-dilution mass spectrometric (IDMS) method was converted to a gravimetric basis. The IDMS method and the existing Davies-Gray titration (gravimetric basis) have met accountability requirements for uranium. More recently, a Pu(VI) diode-array spectrophotometric method was used on a test basis to measure plutonium in shielded-cell input accountability samples. In addition, tests to measure uranium via diode-array spectrophotometry were initiated. This rapid, precise method will replace IDMS for certain key sample points.

  10. 1969 AUDIT OF SRP RADIOACTIVE WASTE

    Office of Scientific and Technical Information (OSTI)

    Ashley A p r i l 1970 Radiological Sciences Division Savannah River Laboratory E. 1. du ... Images are produced from the best avaiiable original document. . . . CONTENTS Page I n t r ...

  11. Environmental Monitoring at the Savannah River Plant, Annual Report - 1981

    SciTech Connect (OSTI)

    Ashley, C.

    2001-07-26

    An environmental monitoring program has been in existence at SRP since 1951. The original preoperational surveys have evolved into an extensive environmental monitoring program in which sample types from approximately 500 locations are analyzed for radiological and/or nonradiological parameters. The results of these analyses for 1981 are presented in this report.

  12. Environmental Impacts from the Operation of Cooling Towers at SRP

    SciTech Connect (OSTI)

    Smith, F.G. III

    2001-06-26

    An assessment has been made of the environmental effects that would occur from the operation of cooling towers at the SRP reactors. A more realistic numerical model of the cooling tower plume has been used to reassess the environmental impacts. The following effects were considered: (1) the occurrence of fog and ice and their impact on nearby structures, (2) drift and salt deposition from the plume, (3) the length and height of the visible plume, and (4) the possible dose from tritium.

  13. Hydrogen production at run-of-river hydro plants

    SciTech Connect (OSTI)

    Tarnay, D.S.

    1983-12-01

    Production of energy from non-renewable petroleum, natural gas and coal is declining due to depletion and high prices. Presently, the research concentrates on reduction of consumption and more efficient use of traditional fuels, and on development of renewable sources of energy and new energy technologies. Most of the new energy sources, however, are not available in a convenient form for consumer. The new energy must be renewable, economically feasible and transportable. Not all the available renewable energy sources have these qualities. Many scientists and engineers believe that hydrogen meets these criteria best. Hydrogen can be produced from various renewable sources such as solar, wind, geothermal, tidal and glacier energies, ocean thermal energy conversion (OTEC), and obviously from - waterpower. The production of hydrogen at run-of-river hydropower plants via electrolysis could be the front-runner in developing new hydrogen energy technologies, and open the way to a new hydrogen era, similarly as the polyphase system and the a-c current generator of N. Tesla used at the Niagara Falls Hydropower Plant, opened the door to a new electrical age in 1895.

  14. Notice of Unplanned Outage at the Mirant Potomac River Plant | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Unplanned Outage at the Mirant Potomac River Plant Notice of Unplanned Outage at the Mirant Potomac River Plant Docket No. EO-05-01. Order No. 202-05-03: Pursuant to the United States Department of Energy ("DOE") Order No_ 202-05-3, issued December 20, 2005 ("DOE Potomac River Order"), Pepco hereby files this notice of an unplanned outage of one of the 230kV circuits serving the Potomac River Substation, and through that station, the District of Columbia. Notice

  15. Site Selection for Concrete Batch Plant to Support Plutonium Disposition Facilities at the Savannah River Site

    SciTech Connect (OSTI)

    Wike, L.D.

    2001-06-15

    WSRC conducted a site selection study to identify, assess, and rank candidate sites for an onsite concrete batch plant at the Savannah River Site in the vicinity of F-Area.

  16. Miles of Hanford Site Land Near River Restored During Planting Seasons

    Office of Energy Efficiency and Renewable Energy (EERE)

    RICHLAND, Wash. – EM’s Richland Operations Office (RL) and contractor Washington Closure Hanford (WCH) have cleaned, filled, and planted vegetation over hundreds of formers waste sites along the Columbia River in the past decade.

  17. Independent Activity Report, Office of River Protection Waste Treatment Plant and Tank Farms- February 2013

    Broader source: Energy.gov [DOE]

    Site Familiarization and Introduction of New Office of Safety and Emergency Management Evaluations Site Lead for the Office of River Protection Waste Treatment Plant and Tank Farms [HIAR-HANFORD-2013-02-25

  18. Natural Convection and Boiling for Cooling SRP Reactors During Loss of Circulation Conditions

    SciTech Connect (OSTI)

    Buckner, M.R.

    2001-06-26

    This study investigated natural convection and boiling as a means of cooling SRP reactors in the event of a loss of circulation accident. These studies show that single phase natural convection cooling of SRP reactors in shutdown conditions with the present piping geometry is probably not feasible.

  19. ATP-independent reversal of a membrane protein aggregate by a chloroplast SRP subunit

    SciTech Connect (OSTI)

    Jaru-Ampornpan, Peera; Shen, Kuang; Lam, Vinh Q.; Ali, Mona; Doniach, Sebastian; Jia, Tony Z.; Shan, Shu-ou (CIT); (Stanford)

    2010-07-23

    Membrane proteins impose enormous challenges to cellular protein homeostasis during their post-translational targeting, and they require chaperones to keep them soluble and translocation competent. Here we show that a novel targeting factor in the chloroplast signal recognition particle (cpSRP), cpSRP43, is a highly specific molecular chaperone that efficiently reverses the aggregation of its substrate proteins. In contrast to 'ATPases associated with various cellular activities' (AAA{sup +}) chaperones, cpSRP43 uses specific binding interactions with its substrate to mediate its 'disaggregase' activity. This disaggregase capability can allow targeting machineries to more effectively capture their protein substrates and emphasizes a close connection between protein folding and trafficking processes. Moreover, cpSRP43 provides the first example to our knowledge of an ATP-independent disaggregase and shows that efficient reversal of protein aggregation can be attained by specific binding interactions between a chaperone and its substrate.

  20. Radioactive waste management at the Savannah River Plant: a technical review. [Contains glossary

    SciTech Connect (OSTI)

    Not Available

    1981-01-01

    This report considers all SRP waste categories. The first part is descriptive: it deals with the SRP's physical environment, the radioactive wastes generated at the site and their current management, the associated monitoring procedures, and some of the hazards presented by the waste. The second part is a critique and evaluation of the practices and conditions described in the first part: it considers the major alternatives for long-range management and disposal of the waste, evaluates the effectiveness of current waste management practices and plans for future management and disposal, and presents the Panel's conclusions and recommendations for future action.

  1. Savannah River's Biomass Steam Plant Success with Clean and Renewable...

    Office of Environmental Management (EM)

    two energy efficient 30,000 lbshr steam boilers to replace a 1950s vintage coal-fired steam plant with a wood-burning (biomass) unit - a "renewable energy source" providing an ...

  2. EIS-0120: Waste Management Activities for Groundwater Protection, Savannah River Plant, Aiken, South Carolina

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy has prepared this environmental impact statement to assess the environmental consequences of the implementation of modified waste management activities for hazardous, low-level radioactive, and mixed wastes for the protection of groundwater, human health, and the environment at its Savannah River Plant in Aiken, South Carolina.

  3. EIS-0120: Waste Management Activities for Groundwater Protection, Savannah River Plant, Aiken, SC

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy has prepared this environmental impact statement to assess the environmental consequences of the implementation of modified waste management activities for hazardous, low-level radioactive, and mixed wastes for the protection of groundwater, human health, and the environment at its Savannah River Plant in Aiken, South Carolina.

  4. Savannah River Site (SRS) environmental overview

    SciTech Connect (OSTI)

    O'Rear, M.G. ); Steele, J.L.; Kitchen, B.G. )

    1990-01-01

    The environmental surveillance activities at and in the vicinity of the Savannah River Site (SRS) (formerly the Savannah River Plant (SRP)) comprise one of the most comprehensive and extensive environmental monitoring programs in the United States. This overview contains monitoring data from routine and nonroutine radiological and nonradiological environmental surveillance activities, summaries of environmental protection programs in progress, a summary of National Environmental Policy Act (NEPA) activities, and a listing of environmental permits (Appendix A) issued by regulatory agencies. This overview provides information about the impact of SRS operations on the public and the environment. The SRS occupies a large area of approximately 300 square miles along the Savannah River, principally in Aiken and Barnwell counties of South Carolina. SRS's primary function is the production of tritium, plutonium, and other special nuclear materials for national defense, for other governmental uses, and for some civilian purposes. From August 1950 to March 31, 1989, SRS was operated for the Department of Energy (DOE) by E. I. du Pont de Nemours Co. On April 1, 1989 the Westinghouse Savannah River Company assumed responsibility as the prime contractor for the Savannah River Site.

  5. Internal Technical Report, Safety Analysis Report 5 MW(e) Raft River Research and Development Plant

    SciTech Connect (OSTI)

    Brown, E.S.; Homer, G.B.; Shaber, C.R.; Thurow, T.L.

    1981-11-17

    The Raft River Geothermal Site is located in Southern Idaho's Raft River Valley, southwest of Malta, Idaho, in Cassia County. EG and G idaho, Inc., is the DOE's prime contractor for development of the Raft River geothermal field. Contract work has been progressing for several years towards creating a fully integrated utilization of geothermal water. Developmental progress has resulted in the drilling of seven major DOE wells. Four are producing geothermal water from reservoir temperatures measured to approximately 149 C (approximately 300 F). Closed-in well head pressures range from 69 to 102 kPa (100 to 175 psi). Two wells are scheduled for geothermal cold 60 C (140 F) water reinjection. The prime development effort is for a power plant designed to generate electricity using the heat from the geothermal hot water. The plant is designated as the ''5 MW(e) Raft River Research and Development Plant'' project. General site management assigned to EG and G has resulted in planning and development of many parts of the 5 MW program. Support and development activities have included: (1) engineering design, procurement, and construction support; (2) fluid supply and injection facilities, their study, and control; (3) development and installation of transfer piping systems for geothermal water collection and disposal by injection; and (4) heat exchanger fouling tests.

  6. Internal Technical Report, Safety Analysis Report 5 MW(e) Raft River Pilot Plant

    SciTech Connect (OSTI)

    Brown, E.S.; Homer, G.B.; Spencer, S.G.; Shaber, C.R.

    1980-05-30

    The Raft River Geothermal Site is located in Southern Idaho's Raft River Valley, southwest of Malta, Idaho, in Cassia County. EG and G idaho, Inc., is the DOE's prime contractor for development of the Raft River geothermal field. Contract work has been progressing for several years towards creating a fully integrated utilization of geothermal water. Developmental progress has resulted in the drilling of seven major DOE wells. Four are producing geothermal water from reservoir temperatures measured to approximately 149 C (approximately 300 F). Closed-in well head pressures range from 69 to 102 kPa (100 to 175 psi). Two wells are scheduled for geothermal cold 60 C (140 F) water reinjection. The prime development effort is for a power plant designed to generate electricity using the heat from the geothermal hot water. The plant is designated as the ''5 MW(e) Raft River Research and Development Plant'' project. General site management assigned to EG and G has resulted in planning and development of many parts of the 5 MW program. Support and development activities have included: (1) engineering design, procurement, and construction support; (2) fluid supply and injection facilities, their study, and control; (3) development and installation of transfer piping systems for geothermal water collection and disposal by injection; and (4) heat exchanger fouling tests.

  7. EFFECT OF CLIMATE CHANGE ON WATERSHED RUNOFF FLOW - UPPER COOSA RIVER BASIN UPSTREAM FROM PLANT HAMMOND

    SciTech Connect (OSTI)

    Chen, K.

    2011-10-24

    The ability of water managers to maintain adequate supplies in the coming decades depends on future weather conditions, as climate change has the potential to reduce stream flows from their current values due to potentially less precipitation and higher temperatures, and possibly rendering them unable to meet demand. The upper Coosa River basin, located in northwest Georgia, plays an important role in supplying water for industry and domestic use in northern Georgia, and has been involved in water disputes in recent times. The seven-day ten-year low flow (7Q10 flow) is the lowest average flow for seven consecutive days that has an average recurrence interval of 10 years. The 7Q10 flow is statistically derived from the observed historical flow data, and represents the low flow (drought) condition for a basin. The upper Coosa River basin also supplies cooling water for the 935MW coal-fired Hammond plant, which draws about 65% of the 7Q10 flow of the upper Coosa River to dissipate waste heat. The water is drawn through once and returned to the river directly from the generator (i.e., no cooling tower is used). Record low flows in 2007 led to use of portable cooling towers to meet temperature limits. Disruption of the Plant Hammond operation may trigger closure of area industrial facilities (e.g. paper mill). The population in Georgia is expected to double from 9 million to 18 million residents in the next 25 years, mostly in the metropolitan Atlanta area. Therefore, there will be an even greater demand for potable water and for waste assimilation. Climate change in the form of persistent droughts (causing low flows) and high ambient temperatures create regulatory compliance challenges for Plant Hammond operating with a once-through cooling system. Therefore, the Upper Coosa River basin was selected to study the effect of potential future weather change on the watershed runoff flow.

  8. Risk-based inspection guide for Crystal River Unit 3 Nuclear Power Plant

    SciTech Connect (OSTI)

    Smith, B.W.; Dukelow, J.S.; Vo, T.V.; Harris, M.S.; Gore, B.F.; Hunt, S.T. )

    1991-06-01

    The Level 1 probabilistic risk assessment (PRA) for Crystal River Unit 3 (CR-3) has been analyzed to identify plant systems and components important to minimizing public risk, as measured by system contributions to plant core damage frequency, and to identify the primary failure modes for these components. The report presents a series of tables, organized by system and prioritized by risk importance, which identify components associated with 98% of the inspectable risk due to plant operation. The systems addressed, in descending order to risk importance are: Low Pressure Injection, AC Power, Service Water, Demineralized Water, High Pressure Injection, DC Power, Emergency Feedwater, Reactor Coolant Pressure Control, and Power Conversion. This ranking is based on the Fussell-Vesely measure of risk importance, i.e., the fraction of the total core damage frequency which involves failures of the system of interest. 3 refs., 9 figs., 13 tabs.

  9. Riparian plant succession in the dam-regulated Colorado River: Why is saltcedar losing

    SciTech Connect (OSTI)

    Stevens, L. )

    1993-06-01

    Three modes of plant succession (inhibition, facilitation and tolerance) were tested to explain the replacement of exotic saltcedar (Tamarix ramosissima) by naive phreatophytes in the Colorado River corridor in the Grand Canyon. Dam construction reduced flood frequency and sediment transport, interrupting the [open quotes]perpetual succession[close quotes] of the pre-dam riparian vegetation and initially allowing saltcedar to proliferate. Inhibition results from direct or indirect competition, but field measurements and experiments demonstrate limited evidence of competitive superiority by naive species over saltcedar in three life stages. Field observations and experiments on germination, physiological responses to gradients and comparative life history analyses demonstrate that saltcedar is a stress tolerant, disturbance specialist in an ecologically stabilized river corridor where safe germination sites are increasingly rare. Altered flood frequency, increased soil coarseness and differential herbivory contribute to succession in this system.

  10. Comparative transportation risk assessment for borosilicate-glass and ceramic forms for immobilization of SRP Defense waste

    SciTech Connect (OSTI)

    Moyer, R A

    1982-04-01

    It is currently planned to immobilize the SRP high-level nuclear waste in solid form and then ship it from SRP to a federal repository. This report compared transportation operations and risks for SRP high-level waste in a borosilicate glass form and in a ceramic form. Radiological and nonradiological impacts from normal transport and from potential accidents during transit were determined using the Defense Waste Process Facility Environmental Impact Statement (DWPF EIS) as the source of basic data. Applicable regulations and some current regulatory uncertainties are also discussed.

  11. Safety Analysis: Evaluation of Accident Risks in the Transporation of Hazardous Materials by Truck and Rail at the Savannah River Plant

    SciTech Connect (OSTI)

    Blanchard, A.

    1999-04-15

    This report presents an analysis of the consequences and risks of accidents resulting from hazardous material transportation at the Savannah River Plant.

  12. Fossil plant maintenance optimization at FPC`s Crystal River Units 4 & 5

    SciTech Connect (OSTI)

    Cossey, J.; Pflasterer, R.; Colsher, R.; Toomey, G.; Smith, S.; Abbott, P.

    1996-07-01

    Florida Power Corporation recently completed a Fossil Plant Maintenance Optimization project at it`s Crystal River Units 4 and 5 coal fired power plant. The project combined Streamlined Reliability Centered Maintenance (SRCM) techniques with a Predictive Maintenance (PDM) Assessment to analyze eleven of the plants systems that represent the principal contributors to maintenance costs. The plant had an extensive existing maintenance program that included several types of condition monitoring. The Benefit-to-Cost analysis indicates that the annual savings associated with the project recommendations result in a payback period of less than one year. This paper summarizes the types of recommendations that were made and describes the processes used for both the SRCM analysis and the PDM Assessment. The SRCM analysis used proven techniques and software that have been used on other projects, including some sponsored by EPRI. The PDM Assessment process was similar to processes used previously for EPRI and non- EPRI utilities; however, this was the first project where the two processes were modified to take advantage of work performed using the other. All of the recommendations developed by the SRCM analysts were reviewed by the PDM analysts before they were finalized. The structure and flow of the project is also described including how the SRCM and PDM analysts interfaced with the plant staff and how implementation was facilitated. The analysis relied on plant experience related to the operation and maintenance history of the equipment. The recommendations for each system were reviewed by a team consisting of the first-line maintenance supervisors, the maintenance planners, and the plant technical services group. The project recommendations are essentially two-thirds implemented, with many of them implemented before the analysis was completed.

  13. Nucleotide-binding flexibility in ultrahigh-resolution structures of the SRP GTPase Ffh

    SciTech Connect (OSTI)

    Ramirez, Ursula D.; Focia, Pamela J.; Freymann, Douglas M.

    2008-10-01

    Crystal structures of the Ffh NG GTPase domain at < 1.24 resolution reveal multiple overlapping nucleotide binding modes. Two structures of the nucleotide-bound NG domain of Ffh, the GTPase subunit of the bacterial signal recognition particle (SRP), have been determined at ultrahigh resolution in similar crystal forms. One is GDP-bound and one is GMPPCP-bound. The asymmetric unit of each structure contains two protein monomers, each of which exhibits differences in nucleotide-binding conformation and occupancy. The GDP-bound Ffh NG exhibits two binding conformations in one monomer but not the other and the GMPPCP-bound protein exhibits full occupancy of the nucleotide in one monomer but only partial occupancy in the other. Thus, under the same solution conditions, each crystal reveals multiple binding states that suggest that even when nucleotide is bound its position in the Ffh NG active site is dynamic. Some differences in the positioning of the bound nucleotide may arise from differences in the crystal-packing environment and specific factors that have been identified include the relative positions of the N and G domains, small conformational changes in the P-loop, the positions of waters buried within the active site and shifts in the closing loop that packs against the guanine base. However, loose binding may have biological significance in promoting facile nucleotide exchange and providing a mechanism for priming the SRP GTPase prior to its activation in its complex with the SRP receptor.

  14. Nucleotide-binding flexibility in ultrahigh-resolution structures of the SRP GTPase Ffh

    SciTech Connect (OSTI)

    Ramirez, U.D.; Focia, P.J.; Freymann, D.M.

    2008-10-24

    Two structures of the nucleotide-bound NG domain of Ffh, the GTPase subunit of the bacterial signal recognition particle (SRP), have been determined at ultrahigh resolution in similar crystal forms. One is GDP-bound and one is GMPPCP-bound. The asymmetric unit of each structure contains two protein monomers, each of which exhibits differences in nucleotide-binding conformation and occupancy. The GDP-bound Ffh NG exhibits two binding conformations in one monomer but not the other and the GMPPCP-bound protein exhibits full occupancy of the nucleotide in one monomer but only partial occupancy in the other. Thus, under the same solution conditions, each crystal reveals multiple binding states that suggest that even when nucleotide is bound its position in the Ffh NG active site is dynamic. Some differences in the positioning of the bound nucleotide may arise from differences in the crystal-packing environment and specific factors that have been identified include the relative positions of the N and G domains, small conformational changes in the P-loop, the positions of waters buried within the active site and shifts in the closing loop that packs against the guanine base. However, 'loose' binding may have biological significance in promoting facile nucleotide exchange and providing a mechanism for priming the SRP GTPase prior to its activation in its complex with the SRP receptor.

  15. Application of Engineering and Technical Requirements for DOE Nuclear Facilities Standard Review Plan (SRP)

    Office of Energy Efficiency and Renewable Energy (EERE)

    This Standard Review Plan (SRP), Application of Engineering and Technical Requirements for DOE Nuclear Facilities, was developed by the Chief of Nuclear Safety (CNS)1, Office of the Under Secretary for Nuclear Security, to help strengthen the technical rigor of line management oversight and federal monitoring of DOE nuclear facilities. This SRP (hereafter refers to as the Engineering SRP) provides consistent review guidance to assure that engineering and technical requirements are appropriately applied for the design, operations and disposition2 of DOE nuclear facilities. It is one of a series of three SRPs developed by the CNS. The other two SRPs address: 1) nuclear safety basis program review; and 2) application of requirements of DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, and DOE-STD-1189, Integration of Safety into the Design Process, for DOE Critical Decision (CD) review and approval. These SRPs may be revised in the future to reflect changes in the DOE requirements, lessons learned, and experience/insights from nuclear facility design, operations, and disposition.

  16. Basic Data Report -- Defense Waste Processing Facility Sludge Plant, Savannah River Plant 200-S Area

    SciTech Connect (OSTI)

    Amerine, D.B.

    1982-09-01

    This Basic Data Report for the Defense Waste Processing Facility (DWPF)--Sludge Plant was prepared to supplement the Technical Data Summary. Jointly, the two reports were intended to form the basis for the design and construction of the DWPF. To the extent that conflicting information may appear, the Basic Data Report takes precedence over the Technical Data Summary. It describes project objectives and design requirements. Pertinent data on the geology, hydrology, and climate of the site are included. Functions and requirements of the major structures are described to provide guidance in the design of the facilities. Revision 9 of the Basic Data Report was prepared to eliminate inconsistencies between the Technical Data Summary, Basic Data Report and Scopes of Work which were used to prepare the September, 1982 updated CAB. Concurrently, pertinent data (material balance, curie balance, etc.) have also been placed in the Basic Data Report. It is intended that these balances be used as a basis for the continuing design of the DWPF even though minor revisions may be made in these balances in future revisions to the Technical Data Summary.

  17. Snake River Plain Play Fairway Analysis – Phase 1 Report

    SciTech Connect (OSTI)

    Shervais, John W.; Glen, Jonathan M.; Liberty, Lee M.; Dobson, Patrick; Gasperikova, Erika

    2015-09-01

    The Snake River volcanic province (SRP) overlies a thermal anomaly that extends deep into the mantle; it represents one of the highest heat flow provinces in North America. Our goals for this Phase 1 study are to: (1) adapt the methodology of Play Fairway Analysis for geothermal exploration to create a formal basis for its application to geothermal systems, (2) assemble relevant data for the SRP from publicly available and private sources, and (3) build a geothermal play fairway model for the SRP and identify the most promising plays, using software tools that are standard in the petroleum industry. The success of play fairway analysis in geothermal exploration depends critically on defining a systematic methodology that is grounded in theory (as developed within the petroleum industry over the last two decades) and within the geologic and hydrologic framework of real geothermal systems. Our preliminary assessment of the data suggests that important undiscovered geothermal resources may be located in several areas of the SRP, including the western SRP (associated with buried lineaments defined by gravity or magnetic anomalies, and capped by extensive deposits of lacustrine sediment), at lineament intersections in the central SRP (along the Banbury-Hagerman trend NW of Twin Falls, and along the northern margin of the Mt Bennett Hills-Camas Prairie area), and along the margins of the eastern SRP. Additional high temperature resources are likely associated with rhyolite domes and crypto-domes in the eastern SRP, but are masked by shallow groundwater flow leading to low upper crustal heat flow values. These blind resources may be exploitable with existing deep drilling technology. Groundwater modeling planned for later phases of the PFA project will address whether temperatures at viable producing depths are sufficient to support electricity production.

  18. Snake River Plain Play Fairway Analysis - Phase 1 Report

    SciTech Connect (OSTI)

    Shervais, John W.; Glen, Jonathan M.; Liberty, Lee M.; Dobson, Patrick; Gasperikova, Erika; Sonnenthal, Eric; Visser, Charles; Nielson, Dennis; Garg, Sabodh; Evans, James P.; Siler, Drew; DeAngelo, Jacob; Athens, Noah; Burns, Erick

    2015-09-02

    The Snake River volcanic province (SRP) overlies a thermal anomaly that extends deep into the mantle; it represents one of the highest heat flow provinces in North America. Our goals for this Phase 1 study are to: (1) adapt the methodology of Play Fairway Analysis for geothermal exploration to create a formal basis for its application to geothermal systems, (2) assemble relevant data for the SRP from publicly available and private sources, and (3) build a geothermal play fairway model for the SRP and identify the most promising plays, using software tools that are standard in the petroleum industry. The success of play fairway analysis in geothermal exploration depends critically on defining a systematic methodology that is grounded in theory (as developed within the petroleum industry over the last two decades) and within the geologic and hydrologic framework of real geothermal systems. Our preliminary assessment of the data suggests that important undiscovered geothermal resources may be located in several areas of the SRP, including the western SRP (associated with buried lineaments defined by gravity or magnetic anomalies, and capped by extensive deposits of lacustrine sediment), at lineament intersections in the central SRP (along the Banbury-Hagerman trend NW of Twin Falls, and along the northern margin of the Mt Bennett Hills-Camas Prairie area), and along the margins of the eastern SRP. Additional high temperature resources are likely associated with rhyolite domes and crypto-domes in the eastern SRP, but are masked by shallow groundwater flow leading to low upper crustal heat flow values. These blind resources may be exploitable with existing deep drilling technology. Groundwater modeling planned for later phases of the PFA project will address whether temperatures at viable producing depths are sufficient to support electricity production.

  19. TRAC analysis of the Crystal River Unit-3 Plant transient of February 26, 1980

    SciTech Connect (OSTI)

    Coddington, P.; Willcutt, G.J.E. Jr.

    1983-01-01

    This paper describes the application of the TRAC-PD2 and TRAC-PF1 codes to analyze the Crystal River transient. The PD2 and PF1 analyses used the three-dimensional and one-dimensional vessel models, respectively. Both calculations predicted the plant depressurization caused by the open PORV and the subsequent repressurization caused by closing the PORV and continuing high-pressure injection flow. Also, natural circulation was calculated in loop B following reestablishment of feedwater to the loop-B steam generator. After system repressurization, the codes calculated that pressure was relieved through the safety valves, and an intermittent flow occurred in loop A because of high-pressure-injection-driven density variations.

  20. The Conformation of Bound GMPPNP Suggests a Mechanism for Gating the Active Site of the SRP GTPase

    SciTech Connect (OSTI)

    Padmanabhan, S.; Freymann, D.

    2010-03-08

    The signal recognition particle (SRP) is a phylogenetically conserved ribonucleoprotein that mediates cotranslational targeting of secreted and membrane proteins to the membrane. Targeting is regulated by GTP binding and hydrolysis events that require direct interaction between structurally homologous 'NG' GTPase domains of the SRP signal recognition subunit and its membrane-associated receptor, SR{alpha}. Structures of both the apo and GDP bound NG domains of the prokaryotic SRP54 homolog, Ffh, and the prokaryotic receptor homolog, FtsY, have been determined. The structural basis for the GTP-dependent interaction between the two proteins, however, remains unknown. We report here two structures of the NG GTPase of Ffh from Thermus aquaticus bound to the nonhydrolyzable GTP analog GMPPNP. Both structures reveal an unexpected binding mode in which the {beta}-phosphate is kinked away from the binding site and magnesium is not bound. Binding of the GTP analog in the canonical conformation found in other GTPase structures is precluded by constriction of the phosphate binding P loop. The structural difference between the Ffh complex and other GTPases suggests a specific conformational change that must accompany movement of the nucleotide from an inactive to an active binding mode. Conserved side chains of the GTPase sequence motifs unique to the SRP subfamily may function to gate formation of the active GTP bound conformation. Exposed hydrophobic residues provide an interaction surface that may allow regulation of the GTP binding conformation, and thus activation of the GTPase, during the association of SRP with its receptor.

  1. Health hazard evaluation report HETA-95-0393-2633, Clinch River Power Plant, Cleveland, Virginia

    SciTech Connect (OSTI)

    Mattorano, D.A.

    1997-05-01

    In response to a request fromm the Building and Construction Trades Department oof the AFL-CIO, an investigation was begun into possible exposures during rebuilding of coal fired boilers at the Clinch River Power Plant (SIC-4911), Cleveland, Virginia. During the sampling period, boilermakers removed secondary inlet and secondary outlet boiler elements and removed and replaced portions of the steel boiler casting, exposing them to fly ash and fumes from air arc gouging, welding, and torch cutting. Laborers maintained the walkways and prepared work areas using sweeping and vacuuming techniques, primarily exposing them to fly ash. The highest personal breathing zone (PBZ) air sample concentrations of arsenic, beryllium, cadmium, nickel, lead, and respirable dust occurred when boilermakers performed job tasks inside the boiler and outside the boiler on the steel boiler casing. Air arc gouging, welding, oxyacetylene torch cutting, or grinding on or near the scale greatly increased the potential for the generation of airborne particles. Cristobalite was found in one PBZ sampel at 0.03mg/m3. The author concludes that there appears to be a potential for a health hazard at job sites where similar activities take place. The author recommends lowering worker exposures through the use of engineering controls and improvements in housekeeping procedures.

  2. Cement-based waste forms for disposal of Savannah River Plant low-level radioactive salt waste

    SciTech Connect (OSTI)

    Langton, C A; Dukes, M D; Simmons, R V

    1983-01-01

    Defense waste processing at the Savannah River Plant will include decontamination and disposal of approximately 100 million liters of soluble salts containing primarily NaNO/sub 3/, NaOH, NaNO/sub 2/, NaAl(OH)/sub 4/, and Na/sub 2/SO/sub 4/. A cement-based waste form, saltstone, has been designed for disposal of Savannah River Plant low-level radioactive salt waste. Bulk properties of this material have been tailored with respect to salt leach rate, permeability, and compressive strength. Microstructure and mineralogy of leached and unleached specimens were characterized by SEM and x-ray diffraction analyses, respectively. It has been concluded that the salt leach rate can be limited so that amounts of salt and radionuclides in the groundwater at the perimeter of the 100-acre disposal site will not exceed EPA drinking water standards. 7 references, 4 figures, 6 tables.

  3. A Synthesis of Environmental and Plant Community Data for Tidal Wetland Restoration Planning in the Lower Columbia River and Estuary

    SciTech Connect (OSTI)

    Diefenderfer, Heida L.; Borde, Amy B.; Cullinan, Valerie I.

    2013-12-01

    This report reanalyzes and synthesizes previously existing environmental and plant community data collected by PNNL at 55 tidal wetlands and 3 newly restored sites in the lower Columbia River and estuary (LCRE) between 2005 and 2011. Whereas data were originally collected for various research or monitoring objectives of five studies, the intent of this report is to provide only information that will have direct utility in planning tidal wetland restoration projects. Therefore, for this report, all tidal wetland data on plants and the physical environment, which were originally developed and reported by separate studies, were tabulated and reanalyzed as a whole. The geographic scope of the data collected in this report is from Bonneville Lock and Dam to the mouth of the Columbia River

  4. CHALLENGES AND OPPORTUNITIES--INTEGRATED LIFE-CYCLE OPTIMIZATION INITIATIVES FOR THE HANFORD RIVER PROTECTION PROJECT--WASTE TREATMENT PLANT

    SciTech Connect (OSTI)

    Auclair, K. D.

    2002-02-25

    This paper describes the ongoing integrated life-cycle optimization efforts to achieve both design flexibility and design stability for activities associated with the Waste Treatment Plant at Hanford. Design flexibility is required to support the Department of Energy Office of River Protection Balance of Mission objectives, and design stability to meet the Waste Treatment Plant construction and commissioning requirements in order to produce first glass in 2007. The Waste Treatment Plant is a large complex project that is driven by both technology and contractual requirements. It is also part of a larger overall mission, as a component of the River Protection Project, which is driven by programmatic requirements and regulatory, legal, and fiscal constraints. These issues are further complicated by the fact that both of the major contractors involved have a different contract type with DOE, and neither has a contract with the other. This combination of technical and programmatic drivers, constraints, and requirements will continue to provide challenges and opportunities for improvement and optimization. The Bechtel National, Inc. team is under contract to engineer, procure, construct, commission and test the Waste Treatment Plant on or ahead of schedule, at or under cost, and with a throughput capacity equal to or better than specified. The Department of Energy is tasked with the long term mission of waste retrieval, treatment, and disposal. While each mission is a compliment and inextricably linked to one another, they are also at opposite ends of the spectrum, in terms of expectations of one another. These mission requirements, that are seemingly in opposition to one another, pose the single largest challenge and opportunity for optimization: one of balance. While it is recognized that design maturation and optimization are the normal responsibility of any engineering firm responsible for any given project, the aspects of integrating requirements and the management

  5. EM Celebrates Ribbon Cutting for New Biomass Plant at Savannah River Site

    Office of Energy Efficiency and Renewable Energy (EERE)

    AIKEN, S.C. – Senior Advisor for Environmental Management David Huizenga and Under Secretary for Nuclear Security Thomas D’Agostino were among the officials who marked the operational startup of the Savannah River Site (SRS) Biomass Cogeneration Facility recently.

  6. Nuclear waste-form risk assessment for US Defense waste at Savannah River Plant. Annual report FY 1981

    SciTech Connect (OSTI)

    Cheung, H.; Edwards, L.L.; Harvey, T.F.; Jackson, D.D.; Revelli, M.A.

    1981-12-01

    Savannah River Plant has been supporting the Lawrence Livermore National Laboratory in its present effort to perform risk assessments of alternative waste forms for defense waste. This effort relates to choosing a suitable combination of solid form and geologic medium on the basis of risk of exposure to future generations; therefore, the focus is on post-closure considerations of deep geologic repositories. The waste forms being investigated include borosilicate glass, SYNROC, and others. Geologic media under consideration are bedded salt, basalt, and tuff. The results of our work during FY 1981 are presented in this, our second annual report. The two complementary tasks that comprise our program, analysis of waste-form dissolution and risk assessment, are described.

  7. TITLE AUTHORS SUBJECT SUBJECT RELATED DESCRIPTION PUBLISHER AVAILABILI...

    Office of Scientific and Technical Information (OSTI)

    audit of SRP radioactive waste Ashley C NUCLEAR FUELS ENVIRONMENTAL SCIENCES SAVANNAH RIVER PLANT ENVIRONMENTAL EFFECTS RADIOACTIVE EFFLUENTS EMISSION HIGH LEVEL RADIOACTIVE WASTES...

  8. Project Execution Plan for the River Protection Project Waste Treatment & Immobilization Plant

    SciTech Connect (OSTI)

    MELLINGER, G.B.

    2003-05-03

    The Waste Treatment and Immobilization Plant (WTP), Project W-530, is the cornerstone in the mission of the Hanford Site's cleanup of more than 50 million gallons of highly toxic, high-level radioactive waste contained in aging underground storage tanks.

  9. Health protection at the Savannah River Site: A guide to records series of the Department of Energy and its contractors

    SciTech Connect (OSTI)

    1996-09-01

    As part of the Department of Energy`s (DOE) Epidemiologic Records Inventory Project, History Associates Incorporated (HAI) prepared this guide to the records series pertaining to health protection activities at the DOE`s Savannah River Site (SRS). Since its inception in the early 1950s, the SRS, formerly known as the Savannah River Plant (SRP), has demonstrated significant interest in safeguarding facilities, protecting employees` health, and monitoring the environment. The guide describes records that concern health protection program administration, radiological monitoring of the plant and the environment, calibration and maintenance of monitoring instruments, internal and external dosimetry practices, medical surveillance of employees, occupational safety and training measures, site visitation, and electronic information systems. The introduction to the guide describes the Epidemiologic Records Inventory Project and HAI`s role in the project. It provides brief histories of the DOE, SRS, and the SRS organizational units responsible for health protection activities. This introduction also summarizes HAI`s methodology in developing criteria and conducting its verification of the SRS inventory of active and inactive SRS Health Protection records. Furthermore, it furnishes information on the production of the guide, the content of the records series descriptions, the location of the records, and the procedures for accessing records repositories.

  10. Plutonium immobilization plant using glass in existing facilities at the Savannah River Site

    SciTech Connect (OSTI)

    DiSabatino, A., LLNL

    1998-06-01

    The Plutonium Immobilization Plant (PIP) accepts plutonium (Pu) from pit conversion and from non-pit sources and, through a glass immobilization process, converts the plutonium into an immobilized form that can be disposed of in a high level waste (HLW) repository. The objective is to make an immobilized form, suitable for geologic disposal, in which the plutonium is as inherently unattractive and inaccessible as the plutonium in spent fuel from commercial reactors.

  11. Plutonium immobilization plant using glass in new facilities at the Savannah River Site

    SciTech Connect (OSTI)

    DiSabatino, A.

    1998-06-01

    The Plutonium Immobilization Plant (PIP) accepts plutonium (Pu) from pit conversion and from non-pit sources and, through a glass immobilization process, converts the plutonium into an immobilized form that can be disposed of in a high level waste (HLW) repository. This immobilization process is shown conceptually in Figure 1-1. The objective is to make an immobilized form, suitable for geologic disposal, in which the plutonium is as inherently unattractive and inaccessible as the plutonium in spent fuel from commercial reactors.

  12. Enhanced Geothermal System Potential for Sites on the Eastern Snake River Plain, Idaho

    SciTech Connect (OSTI)

    Robert K Podgorney; Thomas R. Wood; Travis L McLing; Gregory Mines; Mitchell A Plummer; Michael McCurry; Ahmad Ghassemi; John Welhan; Joseph Moore; Jerry Fairley; Rachel Wood

    2013-09-01

    The Snake River volcanic province overlies a thermal anomaly that extends deep into the mantle and represents one of the highest heat flow provinces in North America (Blackwell and Richards, 2004). This makes the Snake River Plain (SRP) one of the most under-developed and potentially highest producing geothermal districts in the United States. Elevated heat flow is typically highest along the margins of the topographic SRP and lowest along the axis of the plain, where thermal gradients are suppressed by the Snake River aquifer. Beneath this aquifer, however, thermal gradients rise again and may tap even higher heat flows associated with the intrusion of mafic magmas into the mid-crustal sill complex (e.g., Blackwell, 1989).

  13. Plutonium immobilization plant using ceramic in existing facilities at the Savannah River site

    SciTech Connect (OSTI)

    DiSabatino, A., LLNL

    1998-06-01

    The Plutonium Immobilization Plant (PIP) accepts plutonium (Pu) from pit conversion and from non-pit sources, and through a ceramic immobilization process converts the plutonium into an immobilized form that can be disposed of in a high level waste (HLW) repository. This immobilization process is shown conceptually in Figure 1-1. The objective is to make an immobilized form, suitable for geologic disposal, in which the plutonium is as inherently unattractive and inaccessible as the plutonium in spent fuel from commercial reactors. The ceramic immobilization alternative presented in this report consists of first converting the surplus material to an oxide, followed by incorporating the plutonium oxide into a titanate-based ceramic material that is placed in metal cans.

  14. Kings River Conservation District (KRCD) Solar Farm Solar Power...

    Open Energy Info (EERE)

    River Conservation District (KRCD) Solar Farm Solar Power Plant Jump to: navigation, search Name Kings River Conservation District (KRCD) Solar Farm Solar Power Plant Facility...

  15. Independent Activity Report, Office of River Protection Waste...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of River Protection Waste Treatment Plant and Tank Farms - February 2013 Independent Activity Report, Office of River Protection Waste Treatment Plant and Tank Farms - February...

  16. A comparative evaluation of conceptual models for the Snake River Plain aquifer at the Idaho Chemical Processing Plant, INEL

    SciTech Connect (OSTI)

    Prahl, C.J.

    1992-01-01

    Geologic and hydrologic data collected by the United States Geological Survey (USGS) are used to evaluate the existing ground water monitoring well network completed in the upper portion of the Snake River Plain aquifer (SRPA) beneath the Idaho Chemical Processing Plant (ICPP). The USGS data analyzed and compared in this study include: (a) lithologic, geophysical, and stratigraphic information, including the conceptual geologic models intrawell, ground water flow measurement (Tracejector tests) and (c) dedicated, submersible, sampling group elevations. Qualitative evaluation of these data indicate that the upper portion of the SRPA is both heterogeneous and anisotropic at the scale of the ICPP monitoring well network. Tracejector test results indicate that the hydraulic interconnection and spatial configuration of water-producing zones is extremely complex within the upper portion of the SRPA. The majority of ICPP monitoring wells currently are equipped to sample ground water only the upper lithostratigraphic intervals of the SRPA, primarily basalt flow groups E, EF, and F. Depth-specific hydrogeochemical sampling and analysis are necessary to determine if ground water quality varies significantly between the various lithostratigraphic units adjacent to individual sampling pumps.

  17. Savannah River Remediation, College Create Job Opportunities...

    Office of Environmental Management (EM)

    Remediation, College Create Job Opportunities for Graduates Savannah River Remediation, ... "With ongoing missions at the Savannah River Site and construction at Plant Vogtle and ...

  18. The Ohio River Valley CO2 Storage Project AEP Mountaineer Plant, West Virginia Numerical Simulation and Risk Assessment Report

    SciTech Connect (OSTI)

    Neeraj Gupta

    2008-03-31

    A series of numerical simulations of carbon dioxide (CO{sub 2}) injection were conducted as part of a program to assess the potential for geologic sequestration in deep geologic reservoirs (the Rose Run and Copper Ridge formations), at the American Electric Power (AEP) Mountaineer Power Plant outside of New Haven, West Virginia. The simulations were executed using the H{sub 2}O-CO{sub 2}-NaCl operational mode of the Subsurface Transport Over Multiple Phases (STOMP) simulator (White and Oostrom, 2006). The objective of the Rose Run formation modeling was to predict CO{sub 2} injection rates using data from the core analysis conducted on the samples. A systematic screening procedure was applied to the Ohio River Valley CO{sub 2} storage site utilizing the Features, Elements, and Processes (FEP) database for geological storage of CO{sub 2} (Savage et al., 2004). The objective of the screening was to identify potential risk categories for the long-term geological storage of CO{sub 2} at the Mountaineer Power Plant in New Haven, West Virginia. Over 130 FEPs in seven main classes were assessed for the project based on site characterization information gathered in a geological background study, testing in a deep well drilled on the site, and general site conditions. In evaluating the database, it was apparent that many of the items were not applicable to the Mountaineer site based its geologic framework and environmental setting. Nine FEPs were identified for further consideration for the site. These FEPs generally fell into categories related to variations in subsurface geology, well completion materials, and the behavior of CO{sub 2} in the subsurface. Results from the screening were used to provide guidance on injection system design, developing a monitoring program, performing reservoir simulations, and other risk assessment efforts. Initial work indicates that the significant FEPs may be accounted for by focusing the storage program on these potential issues. The

  19. SRP engineering and design history, Vol III, 200 F and H Areas

    SciTech Connect (OSTI)

    Banick, C.J.

    2000-04-17

    This volume combines the record of events relating to the development of design for both the 200-F and H Areas. Chronologically, the definition of plant facilities was first established for the 200-F Area. The second area, 200-H, was projected initially to be a supplementary plutonium separations facility. This history explains the differences in character and capacity of the manufacturing facilities in both areas as production requirements and experience with separations processes advanced.

  20. SAVANNAH RIVER SITE COLD WAR HISTORIC PROPERTY DOCUMENTATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PLANTS Aiken County, South Carolina SAVANNAH RIVER SITE COLD WAR HISTORIC PROPERTY DOCUMENTATION CMX AND TNX CMX AND TNX SA SA V V ANNAH RIVER'S ANNAH RIVER'S PILOT PLANTS ...

  1. The Savannah River Site is owned by the U.S. Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Paul Cloessner, PhD Laboratory Fellow Savannah River National Laboratory Savannah River ... target fabrication plant, which supplied the heavy water reactors at Savannah River. ...

  2. The Savannah River Site is owned by the U.S. Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Director, Science and Technology Savannah River National Laboratory Savannah River ... at the Savannah River National Laboratory and the Rocky Flats Plant in Colorado. ...

  3. Rebecca Sharitz | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Faculty & Scientists SREL Home UGA Plant Biology Rebecca Sharitz Savannah River Ecology ... We are also conducting studies on the population biology and conservation of rare plants, ...

  4. about Savannah River National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Gas Transfer Systems and Reservoir Development The Savannah River Site (SRS) is rich in ... and capabilities of the plant are considered when new systems are being developed. ...

  5. Comparison of SRP high-level waste disposal costs for borosilicate glass and crystalline ceramic waste forms

    SciTech Connect (OSTI)

    McDonell, W R

    1982-04-01

    An evaluation of costs for the immobilization and repository disposal of SRP high-level wastes indicates that the borosilicate glass waste form is less costly than the crystalline ceramic waste form. The wastes were assumed immobilized as glass with 28% waste loading in 10,300 reference 24-in.-diameter canisters or as crystalline ceramic with 65% waste loading in either 3400 24-in.-diameter canisters or 5900 18-in.-diameter canisters. After an interim period of onsite storage, the canisters would be transported to the federal repository for burial. Total costs in undiscounted 1981 dollars of the waste disposal operations, excluding salt processing for which costs are not yet well defined, were about $2500 million for the borosilicate glass form in reference 24-in.-diameter canisters, compared to about $2900 million for the crystalline ceramic form in 24-in.-diameter canisters and about $3100 million for the crystalline ceramic form in 18-in.-diameter canisters. No large differences in salt processing costs for the borosilicate glass and crystalline ceramic forms are expected. Discounting to present values, because of a projected 2-year delay in startup of the DWPF for the crystalline ceramic form, preserved the overall cost advantage of the borosilicate glass form. The waste immobilization operations for the glass form were much less costly than for the crystalline ceramic form. The waste disposal operations, in contrast, were less costly for the crystalline ceramic form, due to fewer canisters requiring disposal; however, this advantage was not sufficient to offset the higher development and processing costs of the crystalline ceramic form. Changes in proposed Nuclear Regulatory Commission regulations to permit lower cost repository packages for defense high-level wastes would decrease the waste disposal costs of the more numerous borosilicate glass forms relative to the crystalline ceramic forms.

  6. Advanced Mass Spectrometers for Hydrogen Isotope Analyses

    SciTech Connect (OSTI)

    Chastagner, P.

    2001-08-01

    This report is a summary of the results of a joint Savannah River Laboratory (SRL) - Savannah River Plant (SRP) ''Hydrogen Isotope Mass Spectrometer Evaluation Program''. The program was undertaken to evaluate two prototype hydrogen isotope mass spectrometers and obtain sufficient data to permit SRP personnel to specify the mass spectrometers to replace obsolete instruments.

  7. Trona Injection Tests: Mirant Potomac River Station, Unit 1,...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of the Potomac River Generating Station in Alexandria, Virginia Update 2 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant, Modeling Unit ...

  8. First Savannah River Shipment Arrives At WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    First Savannah River Site Shipment Arrives At WIPP CARLSBAD, N.M., May 10, 2001 - The U.S. ... from DOE's Savannah River Site has arrived at the Waste Isolation Pilot Plant (WIPP). ...

  9. Red River Biodiesel Ltd | Open Energy Information

    Open Energy Info (EERE)

    Ltd Jump to: navigation, search Name: Red River Biodiesel, Ltd. Place: Houston, Texas Zip: 77006 Product: Red River operates a biodiesel plant in Houstion, Texas with a capacity of...

  10. Enterprise Assessments Review of the Savannah River Site Emergency...

    Energy Savers [EERE]

    Savannah River Site Emergency Management Exercise Program November 2015 Office of ... plants, a heavy water extraction plant, a nuclear fuel and target fabrication ...

  11. EIS Data Call Report: Plutonium immobilization plant using ceramic in new facilities at the Savannah River Site

    SciTech Connect (OSTI)

    DiSabatino, A.

    1998-06-01

    The Plutonium Immobilization Plant (PIP) accepts plutonium (Pu) from pit conversion and from non-pit sources and, through a ceramic immobilization process, converts the plutonium into an immobilized form that can be disposed of in a high level waste (HLW) repository. This immobilization process is shown conceptually in Figure 1-1. The objective is to make an immobilized form, suitable for geologic disposal, in which the plutonium is as inherently unattractive and inaccessible as the plutonium in spent fuel from commercial reactors. The ceramic immobilization alternative presented in this report consists of first converting the surplus material to an oxide, followed by incorporating the plutonium oxide into a titanate-based ceramic material that is placed in metal cans.

  12. EVALUATION OF THE EMISSION, TRANSPORT, AND DEPOSITION OF MERCURY, FINE PARTICULATE MATTER, AND ARSENIC FROM COAL-BASED POWER PLANTS IN THE OHIO RIVER VALLEY REGION

    SciTech Connect (OSTI)

    Kevin Crist

    2004-10-02

    Ohio University, in collaboration with CONSOL Energy, Advanced Technology Systems, Inc (ATS) and Atmospheric and Environmental Research, Inc. (AER) as subcontractors, is evaluating the impact of emissions from coal-fired power plants in the Ohio River Valley region as they relate to the transport and deposition of mercury, arsenic, and associated fine particulate matter. This evaluation will involve two interrelated areas of effort: ambient air monitoring and regional-scale modeling analysis. The scope of work for the ambient air monitoring will include the deployment of a surface air monitoring (SAM) station in southeastern Ohio. The SAM station will contain sampling equipment to collect and measure mercury (including speciated forms of mercury and wet and dry deposited mercury), arsenic, particulate matter (PM) mass, PM composition, and gaseous criteria pollutants (CO, NOx, SO{sub 2}, O{sub 3}, etc.). Laboratory analysis of time-integrated samples will be used to obtain chemical speciation of ambient PM composition and mercury in precipitation. Near-real-time measurements will be used to measure the ambient concentrations of PM mass and all gaseous species including Hg{sup 0} and RGM. Approximately of 18 months of field data will be collected at the SAM site to validate the proposed regional model simulations for episodic and seasonal model runs. The ambient air quality data will also provide mercury, arsenic, and fine particulate matter data that can be used by Ohio Valley industries to assess performance on multi-pollutant control systems. The scope of work for the modeling analysis will include (1) development of updated inventories of mercury and arsenic emissions from coal plants and other important sources in the modeled domain; (2) adapting an existing 3-D atmospheric chemical transport model to incorporate recent advancements in the understanding of mercury transformations in the atmosphere; (3) analyses of the flux of Hg{sup 0}, RGM, arsenic, and fine

  13. Evaluation of the Emission, Transport, and Deposition of Mercury and Fine Particulate Matter from Coal-Based Power Plants in the Ohio River Valley Region

    SciTech Connect (OSTI)

    Kevin Crist

    2008-12-31

    As stated in the proposal: Ohio University, in collaboration with CONSOL Energy, Advanced Technology Systems, Inc (ATS) and Atmospheric and Environmental Research, Inc. (AER) as subcontractors, evaluated the impact of emissions from coal-fired power plants in the Ohio River Valley region as they relate to the transport and deposition of mercury and associated fine particulate matter. This evaluation involved two interrelated areas of effort: ambient air monitoring and regional-scale modeling analysis. The scope of work for the ambient air monitoring included the deployment of a surface air monitoring (SAM) station in southeastern Ohio. The SAM station contains sampling equipment to collect and measure mercury (including speciated forms of mercury and wet and dry deposited mercury), particulate matter (PM) mass, PM composition, and gaseous criteria pollutants (CO, NOx, SO2, O3, etc.). Laboratory analyses of time-integrated samples were used to obtain chemical speciation of ambient PM composition and mercury in precipitation. Nearreal- time measurements were used to measure the ambient concentrations of PM mass and all gaseous species including Hg0 and RGM. Approximately 30 months of field data were collected at the SAM site to validate the proposed regional model simulations for episodic and seasonal model runs. The ambient air quality data provides mercury, and fine particulate matter data that can be used by Ohio Valley industries to assess performance on multi-pollutant control systems. The scope of work for the modeling analysis includes (1) development of updated inventories of mercury emissions from coal plants and other important sources in the modeled domain; (2) adapting an existing 3-D atmospheric chemical transport model to incorporate recent advancements in the understanding of mercury transformations in the atmosphere; (3) analyses of the flux of Hg0, RGM, and fine particulate matter in the different sectors of the study region to identify key transport

  14. Workplace Charging Challenge Partner: Salt River Project | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Under this program, SRP's headquarters received two Level 2 charging stations in 2010. When demand for workplace charging increased in 2012, SRP added eight Level 2 and five Level ...

  15. Ngatamariki Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Name Ngatamariki Geothermal Power Plant Facility Geothermal Power Plant Sector Geothermal energy Location Information Address Mighty River Power Ngahere House 283...

  16. The Savannah River Site is owned by the U.S. Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Associate Laboratory Director, Clean Energy Savannah River National Laboratory Savannah River ... both the Defense Waste Processing Facility and the Hanford Waste Treatment Plant. Mr. ...

  17. Savannah River

    Broader source: Energy.gov [DOE]

    Following are compliance agreements for the Savannah River Site. Also included are short summaries of the agreements.

  18. Update 3 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant, Modeling Units 1 and 4 Together

    Broader source: Energy.gov [DOE]

    Docket No. EO-05-01. Docket No. EO-05-01. This report describes dispersion modeling performed for Units 1 and 4 at Mirant's Potomac River Generating Station. The purpose of the modeling was to...

  19. Novel protein and Mg[superscript 2+] configurations in the Mg[superscript 2+] GDP Complex of the SRP GTPase ffh

    SciTech Connect (OSTI)

    Focia, Pamela J.; Alam, Hena; Lu, Thanh; Ramirez, Ursula D.; Freymann, Douglas M.

    2010-03-05

    Ffh is the signal sequence recognition and targeting subunit of the prokaryotic signal recognition particle (SRP). Previous structural studies of the NG GTPase domain of Ffh demonstrated magnesium-dependent and magnesium-independent binding conformations for GDP and GMPPNP that are believed to reflect novel mechanisms for exchange and activation in this member of the GTPase superfamily. The current study of the NG GTPase bound to Mg{sup 2+} GDP reveals two new binding conformations - in the first the magnesium interactions are similar to those seen previously, however, the protein undergoes a conformational change that brings a conserved aspartate into its second coordination sphere. In the second, the protein conformation is similar to that seen previously, but the magnesium coordination sphere is disrupted so that only five oxygen ligands are present. The loss of the coordinating water molecule, at the position that would be occupied by the oxygen of the {gamma}-phosphate of GTP, is consistent with that position being privileged for exchange during phosphate release. The available structures of the GDP-bound protein provide a series of structural snapshots that illuminate steps along the pathway of GDP release following GTP hydrolysis.

  20. SRP RADIOACTIVE WASTE RELEASES S

    Office of Scientific and Technical Information (OSTI)

    h r o u g h 1 9 5 9 September 1 9 6 0 - R E C O R D - W O R K S T E C H N I C A L D E P A R T M E N T 1 J. E. C o l e , W i l n i 1 4 W. P. 3ebbii 3 H. Worthington, Wilm 16 C. ?. ...

  1. Analysis of Waste Isolation Pilot Plant (WIPP) Samples by the...

    Office of Environmental Management (EM)

    Analysis of Waste Isolation Pilot Plant (WIPP) Samples by the Savannah River National ... investigation into the radiological release event at the Waste Isolation Pilot Plant. ...

  2. Savannah River Laboratory monthly report

    SciTech Connect (OSTI)

    Not Available

    1985-12-01

    Efforts in the area of nuclear reactors and scientific computations are reported, including: robotics; reactor irradiation of nonend-bonded target slugs; computer link with Los Alamos National Laboratory; L-reactor thermal mitigation; aging of carbon in SRP reactor airborne activity confinement systems; and reactor risk assessment for earthquakes. Activities in chemical processes and environmental technology are reported, including: solids formation in a plutonium product stream; revised safety analysis reporting for F and H-Canyon operations; organic carbon analysis of DWPF samples; applications of Fourier transform infrared spectrometry; water chemistry analyzer for SRP reactors; and study of a biological community in Par Pond. Defense waste and laboratory operations activities include: Pu-238 waste incinerator startup; experimental canister frit blaster; saltstone disposal area design; powder metallurgy core diameter measurement; and a new maintenance shop facility. Nuclear materials planning encompasses decontamination and decommissioning of SRP facilities and a comprehensive compilation of environmental and nuclear safety issues. (LEW)

  3. Office of River Protection Prepares for Critical Waste Treatment...

    Office of Environmental Management (EM)

    Prepares for Critical Waste Treatment Plant Testing Office of River Protection Prepares for Critical Waste Treatment Plant Testing May 16, 2016 - 12:40pm Addthis Workers remove the ...

  4. Savannah River Site Waste Isolation Pilot Plant Disposal Program - Acceptable Knowledge Summary Report for Waste Stream: SR-T001-221-HET

    SciTech Connect (OSTI)

    Lunsford, G.F.

    2001-01-24

    This document, along with referenced supporting documents provides a defensible and auditable record of acceptable knowledge for one of the waste streams from the FB-Line. This heterogeneous debris transuranic waste stream was generated after January 25, 1990 and before March 20, 1997. The waste was packaged in 55-gallon drums, then shipped to the transuranic waste storage facility in ''E'' area of the Savannah River Site. This acceptable knowledge report includes information relating to the facility's history, configuration, equipment, process operations and waste management practices. Information contained in this report was obtained from numerous sources including: facility safety basis documentation, historical document archives, generator and storage facility waste records and documents, and interviews with cognizant personnel.

  5. Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    University of Georgia Old Laboratory Site This 113.1-acre (45.8 ha) Set-Aside Area, adjacent to the former location of the Savannah River Ecology Laboratory, is one of the original ten SREL habitat reserves and was selected to complement the old-field habitat/plant succession studies at Field 3-412 (Area #1) and Field 3-409 (Area #28). This relatively disturbed Set-Aside provided field study sites where manipulative research could be carried out on old-fields and radioecology experiments could

  6. PLANTS AS BIO-MONITORS FOR 137CS, 238PU, 239, 240PU AND 40K AT THE SAVANNAH RIVER SITE

    SciTech Connect (OSTI)

    Caldwell, E.; Duff, M.; Ferguson, C.

    2010-12-16

    The nuclear fuel cycle generates a considerable amount of radioactive waste, which often includes nuclear fission products, such as strontium-90 ({sup 90}Sr) and cesium-137 ({sup 137}Cs), and actinides such as uranium (U) and plutonium (Pu). When released into the environment, large quantities of these radionuclides can present considerable problems to man and biota due to their radioactive nature and, in some cases as with the actinides, their chemical toxicity. Radionuclides are expected to decay at a known rate. Yet, research has shown the rate of elimination from an ecosystem to differ from the decay rate due to physical, chemical and biological processes that remove the contaminant or reduce its biological availability. Knowledge regarding the rate by which a contaminant is eliminated from an ecosystem (ecological half-life) is important for evaluating the duration and potential severity of risk. To better understand a contaminants impact on an environment, consideration should be given to plants. As primary producers, they represent an important mode of contamination transfer from sediments and soils into the food chain. Contaminants that are chemically and/or physically sequestered in a media are less likely to be bio-available to plants and therefore an ecosystem.

  7. Waste Treatment And Immobilization Plant U. S. Department Of Energy Office Of River Protection Submerged Bed Scrubber Condensate Disposition Project - Abstract # 13460

    SciTech Connect (OSTI)

    Yanochko, Ronald M; Corcoran, Connie

    2012-11-15

    The Hanford Waste Treatment and Immobilization Plant (WTP) will generate an off-gas treatment system secondary liquid waste stream [submerged bed scrubber (SBS) condensate], which is currently planned for recycle back to the WTP Low Activity Waste (LAW) melter. This SBS condensate waste stream is high in Tc-99, which is not efficiently captured in the vitrified glass matrix. A pre-conceptual engineering study was prepared in fiscal year 2012 to evaluate alternate flow paths for melter off-gas secondary liquid waste generated by the WTP LAW facility. This study evaluated alternatives for direct off-site disposal of this SBS without pre-treatment, which mitigates potential issues associated with recycling.

  8. Environmental Information Document: L-reactor reactivation

    SciTech Connect (OSTI)

    Mackey, H.E. Jr.

    1982-04-01

    Purpose of this Environmental Information Document is to provide background for assessing environmental impacts associated with the renovation, restartup, and operation of L Reactor at the Savannah River Plant (SRP). SRP is a major US Department of Energy installation for the production of nuclear materials for national defense. The purpose of the restart of L Reactor is to increase the production of nuclear weapons materials, such as plutonium and tritium, to meet projected needs in the nuclear weapons program.

  9. Missouri Water Treatment Plant Upgraded

    Broader source: Energy.gov [DOE]

    The city of St. Peters, Missouri obtains its water from one of the best known rivers. Eight pumps from underground wells in the Mississippi River floodplain send water to a lime-softening water treatment plant where it is prepared for drinking water purposes. But because the demand for clean water exists at all times, the plant consumes noticeably large amounts of money and energy.

  10. Waste Treatment and Immobilization Plant U. S. Department of Energy Office of River Protection Submerged Bed Scrubber Condensate Disposition Project - 13460

    SciTech Connect (OSTI)

    Yanochko, Ronald M. [Washington River Protection Solutions, P.O. Box 850, Richland, Washington 99352 (United States)] [Washington River Protection Solutions, P.O. Box 850, Richland, Washington 99352 (United States); Corcoran, Connie [AEM Consulting, LLC, 1201 Jadwin Avenue, Richland, Washington 99352 (United States)] [AEM Consulting, LLC, 1201 Jadwin Avenue, Richland, Washington 99352 (United States)

    2013-07-01

    The Hanford Waste Treatment and Immobilization Plant (WTP) will generate an off-gas treatment system secondary liquid waste stream [submerged bed scrubber (SBS) condensate], which is currently planned for recycle back to the WTP Low Activity Waste (LAW) melter. This SBS condensate waste stream is high in Tc-99, which is not efficiently captured in the vitrified glass matrix [1]. A pre-conceptual engineering study was prepared in fiscal year 2012 to evaluate alternate flow paths for melter off-gas secondary liquid waste generated by the WTP LAW facility [2]. This study evaluated alternatives for direct off-site disposal of this SBS without pre-treatment, which mitigates potential issues associated with recycling. This study [2] concluded that SBS direct disposal is a viable option to the WTP baseline. The results show: - Off-site transportation and disposal of the SBS condensate is achievable and cost effective. - Reduction of approximately 4,325 vitrified WTP Low Activity Waste canisters could be realized. - Positive WTP operational impacts; minimal WTP construction impacts are realized. - Reduction of mass flow from the LAW Facility to the Pretreatment Facility by 66%. - Improved Double Shell Tank (DST) space management is a benefit. (authors)

  11. Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Assessment of Radionuclide Monitoring in the CSRA Savannah River NERP Research ... Upcoming Seminars The Savannah River Ecology Laboratory is a research unit of the ...

  12. LBB considerations for a new plant design

    SciTech Connect (OSTI)

    Swamy, S.A.; Mandava, P.R.; Bhowmick, D.C.; Prager, D.E.

    1997-04-01

    The leak-before-break (LBB) methodology is accepted as a technically justifiable approach for eliminating postulation of Double-Ended Guillotine Breaks (DEGB) in high energy piping systems. This is the result of extensive research, development, and rigorous evaluations by the NRC and the commercial nuclear power industry since the early 1970s. The DEGB postulation is responsible for the many hundreds of pipe whip restraints and jet shields found in commercial nuclear plants. These restraints and jet shields not only cost many millions of dollars, but also cause plant congestion leading to reduced reliability in inservice inspection and increased man-rem exposure. While use of leak-before-break technology saved hundreds of millions of dollars in backfit costs to many operating Westinghouse plants, value-impacts resulting from the application of this technology for future plants are greater on a per plant basis. These benefits will be highlighted in this paper. The LBB technology has been applied extensively to high energy piping systems in operating plants. However, there are differences between the application of LBB technology to an operating plant and to a new plant design. In this paper an approach is proposed which is suitable for application of LBB to a new plant design such as the Westinghouse AP600. The approach is based on generating Bounding Analyses Curves (BAC) for the candidate piping systems. The general methodology and criteria used for developing the BACs are based on modified GDC-4 and Standard Review Plan (SRP) 3.6.3. The BAC allows advance evaluation of the piping system from the LBB standpoint thereby assuring LBB conformance for the piping system. The piping designer can use the results of the BACs to determine acceptability of design loads and make modifications (in terms of piping layout and support configurations) as necessary at the design stage to assure LBB for the, piping systems under consideration.

  13. Cleaning Up the Hanford River Corridor and Improving Site Operations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Jon Peschong, Deputy Assistant Manager for the River and Plateau, Department of Energy Richland Operations Office September 2014 2 Richland Cleanup Priorities * Maintain safe, secure and compliant activities, facilities and operations * Continue River Corridor cleanup, including remediation of 618-10 Burial Ground * Continue Plutonium Finishing Plant deactivation, decommissioning and demolition * Continue groundwater pump and treat operations, and implement additional groundwater remedies 3

  14. SAVANNAH RIVER OPERATIONS OFFICE AIKEN, SC 29802 NEWS MEDIA CONTACT...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    tanks received over the weekend at the Savannah River Site (SRS) have been successfully ... Full plant operations are currently scheduled for late 2015. -MORE- SR-2012-03 2 Newly ...

  15. Secondary solvent cleanup using activated alumina: Laboratory development

    SciTech Connect (OSTI)

    Mailen, J.C.

    1987-01-01

    The primary cleanup of PUREX solvent removes short-chain acidic organic degradation products effectively but leaves a variety of degradation products. These materials cause problems with phase separation and retention of cations. A process using activated alumina to remove secondary degradation products received laboratory development at Oak Ridge National Laboratory using Savannah River Plant and Idaho Chemical Processing plant solvents, was further developed at Savannah River Laboratory using SRP solvent, and was tested at full scale at SRP. This paper describes the development at ORNL. 6 refs., 1 fig., 1 tab.

  16. Cemex River Plant | Open Energy Information

    Open Energy Info (EERE)

    W 3,200,000,000 mW 0.0032 GW Number of Units 2 Commercial Online Date 2012 Wind Turbine Manufacturer GE Energy References AWEA 2012 Market Report1 Loading map......

  17. Waste Treatment & Immobilization Plant - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Waste Treatment & Immobilization Plant Office of River Protection About ORP ORP Projects & Facilities Tank Farms Waste Treatment & Immobilization Plant 242-A Evaporator 222-S Laboratory Newsroom Contracts & Procurements Contact ORP Waste Treatment & Immobilization Plant Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size Waste Treatment Plant Overview Waste Treatment and Immobilization Plant Background Information The Hanford Site, located in

  18. Savannah River Technology Center. Monthly report

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    This document contains information about the research programs being conducted at the Savannah River Plant. Topics of discussion include: thermal cycling absorption process, development of new alloys, ion exchange, oxalate precipitation, calcination, environmental research, remedial action, ecological risk assessments, chemical analysis of salt cakes, natural phenomena hazards assessment, and sampling of soils and groundwater.

  19. Volvo Trucks Manufacturing Plant in Virginia

    Broader source: Energy.gov [DOE]

    Volvo Group North America’s 1.6-million-square-foot New River Valley Plant in Dublin, Virginia, is the company’s largest truck manufacturing plant in the world. The company has implemented many energy savings solutions as part of the Better Buildings, Better Plants Challenge.

  20. Raft River Geothermal Area Data Models - Conceptual, Logical and Fact Models

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Cuyler, David

    2012-07-19

    Conceptual and Logical Data Model for Geothermal Data Concerning Wells, Fields, Power Plants and Related Analyses at Raft River a. Logical Model for Geothermal Data Concerning Wells, Fields, Power Plants and Related Analyses, David Cuyler 2010 b. Fact Model for Geothermal Data Concerning Wells, Fields, Power Plants and Related Analyses, David Cuyler 2010 Derived from Tables, Figures and other Content in Reports from the Raft River Geothermal Project: "Technical Report on the Raft River Geothermal Resource, Cassia County, Idaho," GeothermEx, Inc., August 2002. "Results from the Short-Term Well Testing Program at the Raft River Geothermal Field, Cassia County, Idaho," GeothermEx, Inc., October 2004.

  1. Raft River Geothermal Area Data Models - Conceptual, Logical and Fact Models

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Cuyler, David

    Conceptual and Logical Data Model for Geothermal Data Concerning Wells, Fields, Power Plants and Related Analyses at Raft River a. Logical Model for Geothermal Data Concerning Wells, Fields, Power Plants and Related Analyses, David Cuyler 2010 b. Fact Model for Geothermal Data Concerning Wells, Fields, Power Plants and Related Analyses, David Cuyler 2010 Derived from Tables, Figures and other Content in Reports from the Raft River Geothermal Project: "Technical Report on the Raft River Geothermal Resource, Cassia County, Idaho," GeothermEx, Inc., August 2002. "Results from the Short-Term Well Testing Program at the Raft River Geothermal Field, Cassia County, Idaho," GeothermEx, Inc., October 2004.

  2. Savannah River Site Settlement Agreement, May 1, 1987 Summary

    Office of Environmental Management (EM)

    27-SW State South Carolina Agreement Type Settlement Agreement Legal Driver(s) RCRA Scope Summary Establish a course of action due to SRP's violation of the Department's Hazardous ...

  3. Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    in 1997 and replaced with two other areas, both located in the Savannah River swamp. ... on the natural levy that parallels the Savannah River. Area: 1 2 3 4 5 6 7 8 9 10 11 ...

  4. River Corridor - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    River Corridor Richland Operations Office Richland Operations Office River Corridor B Reactor 300 Area 324 Building 618-10 and 618-11 Burial Grounds C Reactor D and DR Reactors F ...

  5. River Corridor Achievements

    Broader source: Energy.gov [DOE]

    Washington Closure Hanford and previous contractors have completed much of the cleanup work in the River Corridor, shown here.

  6. Technical summary of groundwater quality protection program at the Savannah River Site (1952--1986). Volume 2, Groundwater monitoring results

    SciTech Connect (OSTI)

    Heffner, J.D.

    1991-11-01

    Data is presented regarding ground water monitoring results from the Savannah River Plant for the years of 1952-1986. (CBS)

  7. Radioiodine in the Savannah River Site environment

    SciTech Connect (OSTI)

    Kantelo, M.V.; Bauer, L.R.; Marter, W.L.; Murphy, C.E. Jr.; Zeigler, C.C.

    1993-01-15

    Radioiodine, which is the collective term for all radioactive isotopes of the element iodine, is formed at the Savannah River Site (SRS) principally as a by-product of nuclear reactor operations. Part of the radioiodine is released to the environment during reactor and reprocessing operations at the site. The purpose of this report is to provide an introduction to radioiodine production and disposition, its status in the environment, and the radiation dose and health risks as a consequence of its release to the environment around the Savannah River Plant. A rigorous dose reconstruction study is to be completed by thee Center for Disease Control during the 1990s.

  8. Office of River Protection - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Office of River Protection Office of River Protection Office of River Protection Office of River Protection Email Email Page | Print Print Page |Text Increase Font Size Decrease...

  9. Historical river flow rates for dose calculations

    SciTech Connect (OSTI)

    Carlton, W.H.

    1991-06-10

    Annual average river flow rates are required input to the LADTAP Computer Code for calculating offsite doses from liquid releases of radioactive materials to the Savannah River. The source of information on annual river flow rates used in dose calculations varies, depending on whether calculations are for retrospective releases or prospective releases. Examples of these types of releases are: Retrospective - releases from routine operations (annual environmental reports) and short term release incidents that have occurred. Prospective - releases that might be expected in the future from routine or abnormal operation of existing or new facilities (EIS`s, EID`S, SAR`S, etc.). This memorandum provides historical flow rates at the downstream gauging station at Highway 301 for use in retrospective dose calculations and derives flow rate data for the Beaufort-Jasper and Port Wentworth water treatment plants.

  10. Savannah River National Laboratory (SRNL) Environmental Sciences and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Biotechnology Support of Waste Isolation Pilot Plant (WIPP) | Department of Energy National Laboratory (SRNL) Environmental Sciences and Biotechnology Support of Waste Isolation Pilot Plant (WIPP) Savannah River National Laboratory (SRNL) Environmental Sciences and Biotechnology Support of Waste Isolation Pilot Plant (WIPP) This document was used to determine facts and conditions during the Department of Energy Accident Investigation Board's investigation into the radiological release event

  11. River and Plateau Committee

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of Energy River Turbine Provides Clean Energy to Remote Alaskan Village River Turbine Provides Clean Energy to Remote Alaskan Village August 18, 2015 - 10:36am Addthis River Turbine Provides Clean Energy to Remote Alaskan Village Alison LaBonte Marine and Hydrokinetic Technology Manager To date, Ocean Renewable Power Company (ORPC) is the only company to have built, operated and delivered power to a utility grid from a hydrokinetic tidal project, and to a local microgrid from a hydrokinetic

  12. Savannah River National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Savannah River National Laboratory srnl.doe.gov SRNL is a DOE National Laboratory operated by Savannah River Nuclear Solutions. At a glance 'Tin whiskers' suppression method Researchers at the Savannah River National Laboratory (SRNL) have identified a treatment method that slows or prevents the formation of whiskers in lead-free solder. Tin whiskers spontaneously grow from thin films of tin, often found in microelectronic devices in the form of solders and platings. Background This problem was

  13. Comments of Mirant Potomac River, LLC in Compliance with Order No.

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    202-06-01 | Department of Energy of Mirant Potomac River, LLC in Compliance with Order No. 202-06-01 Comments of Mirant Potomac River, LLC in Compliance with Order No. 202-06-01 Docket No. EO-05-01: Order No. 202-06-01: Pursuant to Order No. 202-06-1 issued by the Department of Energy ("DOE") on February 17, 2006, Mirant Potomac River, LLC ("Mirant") submits the following comments regarding the operation of the Potomac River Plant ("Plant") during certain days

  14. Great River (1973)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Volume One Film Collection Volume Two 75th Anniversary Hydropower in the Northwest Woody Guthrie Videos Strategic Direction Branding & Logos Power of the River History Book...

  15. River of Power (1987)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Volume One Film Collection Volume Two 75th Anniversary Hydropower in the Northwest Woody Guthrie Videos Strategic Direction Branding & Logos Power of the River History Book...

  16. Mirant Potomac River: DOE Case OE-05-01 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    River: DOE Case OE-05-01 Mirant Potomac River: DOE Case OE-05-01 Written presentation of information regarding the Potomac River power plant that Mirant shared with DOE, PEPCO and PJM at a meeting called by DOE on September 1, 2005. Mirant Potomac River: DOE Case OE-05-01 (232.7 KB) More Documents & Publications Comments on Department of Energy's Emergency Order To Resume Limited Operation at Mirant's Potomac River Generating Station and Proposed Mirant Compliance Plan Notice of Emergency

  17. Waste management units - Savannah River Site

    SciTech Connect (OSTI)

    Not Available

    1989-10-01

    This report is a compilation of worksheets from the waste management units of Savannah River Plant. Information is presented on the following: Solid Waste Management Units having received hazardous waste or hazardous constituents with a known release to the environment; Solid Waste Management Units having received hazardous waste or hazardous constituents with no known release to the environment; Solid Waste Management Units having received no hazardous waste or hazardous constituents; Waste Management Units having received source; and special nuclear, or byproduct material only.

  18. Property:AvgTempGeoFluidIntoPlant | Open Energy Information

    Open Energy Info (EERE)

    North Brawley Geothermal Power Plant + 520 + O Ormesa IH Geothermal Facility + 296 + R Raft River Geothermal Facility + 270 + Reykjanes Geothermal Power Station + 590 + Retrieved...

  19. Lower Colorado River Authority | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Lower Colorado River Authority's communications requirements Lower Colorado River Authority (134.07

  20. about Savannah River National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The EDM capability at the Savannah River National Laboratory (SRNL) is unique to the Savannah River Site. It allows for very fine, precise cutting of metal without destroying ...

  1. Wildflowers of the Savannah River Site

    SciTech Connect (OSTI)

    Seger, Tona

    2015-08-01

    This guidebook is a resource to help field personnel (nonbotanists) identify plants on the Savannah River Site (SRS) premises. Although not a complete flora guide, this publication contains information about 123 plant species found on the SRS. Plants are listed by their common names and arranged by the color of the flower. The SRS supports a diverse array of plant communities. Land use history, the establishment of the SRS, and current land management practices have shaped the flora presently found on the SRS. Located south of Aiken, SC, SRS spans 198,344 acres with land covering Aiken, Allendale, and Barnwell Counties. Situated on the Upper Coastal Plain and Sandhills physiographic provinces, the SRS has more than 50 distinct soil types. The topography is rolling to flat with elevation ranges from 50 to 400 feet above sea level.

  2. Savannah River Field Office | National Nuclear Security Administration |

    National Nuclear Security Administration (NNSA)

    (NNSA) Savannah River

  3. Louisiana Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    Louisiana nuclear power plants, summer capacity and net generation, 2010" "Plant Name/Total Reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net generation (Pprcent)","Owner" "River Bend Unit 1",974,"8,363",44.9,"Entergy Gulf States - LA LLC" "Waterford 3 Unit 3","1,168","10,276",55.1,"Entergy Louisiana Inc" "2 Plants 2

  4. EA-1973: Kootenai River Restoration at Bonners Ferry, Boundary County, Idaho

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration (BPA) is preparing an EA to assess the potential environmental impacts of funding the Kootenai Tribe of Idaho to restore portions of the Kootenai River near the town of Bonners Ferry, Idaho. The proposed project involves installing structures on the river banks, excavating areas in the river to create deeper pools, and developing and enhancing islands that would be planted with native vegetation.

  5. Snake River Plain Geothermal Play Fairway Analysis - Phase 1 Raster Files

    SciTech Connect (OSTI)

    John Shervais

    2015-10-09

    Snake River Plain Play Fairway Analysis - Phase 1 CRS Raster Files. This dataset contains raster files created in ArcGIS. These raster images depict Common Risk Segment (CRS) maps for HEAT, PERMEABILITY, AND SEAL, as well as selected maps of Evidence Layers. These evidence layers consist of either Bayesian krige functions or kernel density functions, and include: (1) HEAT: Heat flow (Bayesian krige map), Heat flow standard error on the krige function (data confidence), volcanic vent distribution as function of age and size, groundwater temperature (equivalue interval and natural breaks bins), and groundwater T standard error. (2) PERMEABILTY: Fault and lineament maps, both as mapped and as kernel density functions, processed for both dilational tendency (TD) and slip tendency (ST), along with data confidence maps for each data type. Data types include mapped surface faults from USGS and Idaho Geological Survey data bases, as well as unpublished mapping; lineations derived from maximum gradients in magnetic, deep gravity, and intermediate depth gravity anomalies. (3) SEAL: Seal maps based on presence and thickness of lacustrine sediments and base of SRP aquifer. Raster size is 2 km. All files generated in ArcGIS.

  6. River and Harbors Act

    Broader source: Energy.gov [DOE]

    Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403) prohibits the unauthorized obstruction or alteration of any navigable water of the United States.

  7. Savannah river site

    National Nuclear Security Administration (NNSA)

    at the Savannah River Site (SRS) to supply and process tritium, a radioactive form of hydrogen that is a vital component of nuclear weapons. SRS loads tritium and non-tritium...

  8. Plant Operational Status - Pantex Plant

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plant Operational Status Plant Operational Status Page Content Shift 1 - Day The Pantex Plant is open for normal Day Shift operations. Plant personnel are to report as assigned. Personnel may call 477-3000, Option 1 for additional details. Shift 2 - Swing The Pantex Plant is open for normal Swing Shift operations. Plant personnel are to report as assigned. Personnel may call 477-3000, Option 1 for additional details. Shift 3 - Grave The Pantex Plant is open for normal Graveyard Shift operations.

  9. Sioux River Ethanol LLC | Open Energy Information

    Open Energy Info (EERE)

    River Ethanol LLC Jump to: navigation, search Name: Sioux River Ethanol LLC Place: Hudson, South Dakota Zip: 57034 Product: Farmer owned ethanol producer, Sioux River Ethanol is...

  10. Office of River Protection - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Office of River Protection Office of River Protection About ORP ORP Projects & Facilities Newsroom Contracts & Procurements Contact ORP Office of River Protection Email Email Page...

  11. Savannah River Site | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Savannah River Site FY 2016 FY 2016 Performance Evaluation Plan, Savannah River Nuclear Solutions, LLC FY 2015 FY 2015 Performance Evaluation Report, Savannah River Nuclear ...

  12. Savannah River Site Waste Disposition Project

    Office of Environmental Management (EM)

    Terrel J. Spears Assistant Manager Waste Disposition Project DOE Savannah River Operations Office Savannah River Site Savannah River Site Waste Disposition Project Waste ...

  13. Sky River Wind Farm | Open Energy Information

    Open Energy Info (EERE)

    River Wind Farm Jump to: navigation, search Name Sky River Wind Farm Facility Sky River Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner...

  14. Flambeau River Biofuels | Open Energy Information

    Open Energy Info (EERE)

    Flambeau River Biofuels Jump to: navigation, search Name: Flambeau River Biofuels Place: Park Falls, Wisconsin Sector: Biomass Product: A subsidiary of Flambeau River Papers LLC...

  15. Raft River Geothermal Facility | Open Energy Information

    Open Energy Info (EERE)

    Facility Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Raft River Geothermal Facility General Information Name Raft River Geothermal Facility Facility Raft River...

  16. Wing River Wind Farm | Open Energy Information

    Open Energy Info (EERE)

    to: navigation, search Name Wing River Wind Farm Facility Wing River Wind Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Wing River...

  17. Exhibits | Savannah River Ecology Laboratory Environmental Outreach Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Exhibits The SREL Outreach Program presents displays at many local and regional events to promote awareness of our extraordinary ecosystem to large numbers of people from many diverse backgrounds. The exhibits use live animals and plants to demonstrate the biodiversity of local ecosystems. If you are interested in having the Savannah River Ecology Laboratory participate in your event with a live animal and plant exhibit, you need to make your request well in advance. Exhibits are often scheduled

  18. Cleaning Up the Hanford River Corridor and Improving Site Operations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plutonium Finishing Plant (PFP) Closure Update River & Plateau Committee Hanford Advisory Board Bryan Foley, Acting Federal Project Director PFP Closure Project June 10, 2014 2014 The Future 2 Plutonium Finishing Plant * Mission: Safely and compliantly demolish PFP to slab-on-grade by 2016 PFP: plutonium processing facility decades past its design life 3 PFP Recent Accomplishments * Continued Glovebox/Hood deactivation activities: * Removed HC-17 (HC-17P, HC-17DC, HC-17SBB) in March *

  19. DOE/EA-1927, Paducah Gaseous Diffusion Plant Final Environmental...

    Energy Savers [EERE]

    ... The Tennessee Valley Authority (TVA) Shawnee Fossil Plant uses water from the Ohio River for once-through cooling. With the thermoelectric category included, about 0.1 percent of ...

  20. Savannah River Site Promotes Sharing Technology Innovation Across DOE Complex

    Broader source: Energy.gov [DOE]

    AIKEN, S.C. – An innovative data collection technology for environmental compliance sampling developed and used by the Savannah River Site is now being deployed at the Portsmouth Gaseous Diffusion Plant in Piketon, Ohio to increase the efficiency of cleanup operations as EM continues to promote sharing lessons learned and new technologies across DOE sites.

  1. Cleaning Up the Hanford River Corridor and Improving Site Operations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Stacy Charboneau, Assistant Manager for Safety and Environment, Department of Energy Richland Operations Office June 2014 2 Richland Cleanup Priorities * Maintain safe, secure and compliant activities, facilities and operations * Continue River Corridor cleanup, including remediation of 618-10 Burial Ground * Continue Plutonium Finishing Plant deactivation, decommissioning and demolition * Continue groundwater pump and treat operations, and implement additional groundwater remedies 3 Richland

  2. Analysis of Waste Isolation Pilot Plant (WIPP) Underground and MgO Samples

    Office of Environmental Management (EM)

    by the Savannah River National Laboratory (SRNL) | Department of Energy Underground and MgO Samples by the Savannah River National Laboratory (SRNL) Analysis of Waste Isolation Pilot Plant (WIPP) Underground and MgO Samples by the Savannah River National Laboratory (SRNL) This document was used to determine facts and conditions during the Department of Energy Accident Investigation Board's investigation into the radiological release event at the Waste Isolation Pilot Plant. The Technical

  3. H-02 Constructed Wetland Studies: Amphibians and Plants | SREL Research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    H-02 Constructed Wetland Studies: Amphibians and Plants Amphibian Studies: Stacey Lance, David Scott, Wes Flynn, and Diana Soteropoulos Vegetation Surveys: Rebecca Sharitz, Linda Lee, and Paul Stankus The H-02 treatment wetland array associated with the H-Area facilities Buckets at sampling location Green treefrogs (Hyla cinerea) on planted bulrush stems Construction of the H-02 treatment wetlands adjacent to H-Area on the Savannah River Site (SRS) began during FY-2007. The Savannah River

  4. Schlumberger soundings in the Upper Raft River and Raft River...

    Open Energy Info (EERE)

    soundings in the Upper Raft River and Raft River Valleys, Idaho and Utah Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Schlumberger soundings in the...

  5. Savannah River Site Consent Order 85-70-SW, November 7, 1985...

    Office of Environmental Management (EM)

    Administrative Consent Order 85-70-SW State South Carolina Agreement Type Consent Order Legal Driver(s) RCRA Scope Summary Establish course of action due to SRP's violation of the ...

  6. Lower Colorado River Authority | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    from Lower Colorado River Authority on Smart Grid communications requirements Lower Colorado River Authority (349.31

  7. Reese River Geothermal Project | Open Energy Information

    Open Energy Info (EERE)

    River Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Reese River Geothermal Project Project Location Information...

  8. Linda Lee | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Lee Faculty & Scientists SREL Home Linda Lee Savannah River Ecology Laboratory P O Drawer E, Aiken, SC 29802 (803) 725-5883 office (803) 725-3309 fax lee(at)srel.uga.edu I have a broad range of interests including wetland ecology, habitat management and restoration, and plant conservation. One of my current projects is evaluating the erosion control potential of native grassland vegetation against two commonly-used turf grasses. I am also working with Audubon South Carolina on a new

  9. Florida Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    Florida nuclear power plants, summer capacity and net generation, 2010" "Plant name/total reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net generation (percent)","Owner" "Crystal River Unit 3",860,0,"--","Progress Energy Florida Inc" "St Lucie Unit 1, Unit 2","1,678","12,630",52.8,"Florida Power & Light Co" "Turkey Point

  10. Savannah River Site Robotics

    SciTech Connect (OSTI)

    2010-01-01

    Meet Sandmantis and Frankie, two advanced robotic devices that are key to cleanup at Savannah River Site. Sandmantis cleans hard, residual waste off huge underground storage tanks. Frankie is equipped with unique satellite capabilities and sensing abilties that can determine what chemicals still reside in the tanks in a cost effective manner.

  11. Savannah River Site Robotics

    ScienceCinema (OSTI)

    None

    2012-06-14

    Meet Sandmantis and Frankie, two advanced robotic devices that are key to cleanup at Savannah River Site. Sandmantis cleans hard, residual waste off huge underground storage tanks. Frankie is equipped with unique satellite capabilities and sensing abilties that can determine what chemicals still reside in the tanks in a cost effective manner.

  12. Kootenai River Biological Baseline Status Report : Annual Report, 1996.

    SciTech Connect (OSTI)

    Richards, Diana

    1997-02-01

    The Kootenai River ecosystem in Idaho, Montana and British Columbia (B.C.) Canada has been severely degraded during the past 50 years. This aquatic ecosystem has changed from one that was culturally eutrophic, to one that is oligotrophic due to channelization, diking, impoundment (construction and operation of Libby Dam), and pollution abatement measures in the watershed. As a result of these influences, flow regimes, temperature patterns, and water quality were altered, resulting in changes in primary production and aquatic insect and fish populations. Construction of Libby Dam (creation of Lake Koocanusa) and closure of Cominco`s fertilizer plant resulted in decreased phosphorus load to the Kootenai River to below historical levels. Dissolved orthophosphorus concentrations averaged 0.383 mg/L in 1970 as compared to 0.039 mg/L in 1979. Total phosphorus concentrations followed a similar pattern. Both total phosphorus and soluble reactive phosphorus concentrations remained below 0.05 mg/L from 1976 to 1994, characterizing the river as oligotrophic. Post Libby Dam primary productivity levels in the river represent an ultra-oligotrophic to mesotrophic system. Since the construction and operation of Libby Dam, invertebrate densities immediately downstream from the dam increased, but species diversity decreased. Insect diversity increased with increasing distance from the dam, but overall species diversity was lower than would be expected in a free-flowing river. Fish species composition and abundance has also changed as a result of the changes in the river and its watershed.

  13. Waste Treatment and Immobilation Plant Pretreatment Facility

    Office of Environmental Management (EM)

    7 Technology Readiness Assessment for the Waste Treatment and Immobilization Plant (WTP) Pretreatment Facility L. Holton D. Alexander M. Johnson H. Sutter August 2007 Prepared by the U.S. Department of Energy Office of River Protection Richland, Washington, 99352 07-DESIGN-047 Technology Readiness Assessment for the Waste Treatment and Immobilization Plant (WTP) Pretreatment Facilities L. Holton D. Alexander M. Johnson H. Sutter August 2007 Prepared by the U.S. Department of Energy Office of

  14. Hood River Passive House

    SciTech Connect (OSTI)

    Hales, D.

    2013-03-01

    The Hood River Passive Project was developed by Root Design Build of Hood River Oregon using the Passive House Planning Package (PHPP) to meet all of the requirements for certification under the European Passive House standards. The Passive House design approach has been gaining momentum among residential designers for custom homes and BEopt modeling indicates that these designs may actually exceed the goal of the U.S. Department of Energy's (DOE) Building America program to reduce home energy use by 30%-50% (compared to 2009 energy codes for new homes). This report documents the short term test results of the Shift House and compares the results of PHPP and BEopt modeling of the project.

  15. EA-1981: Bonneville-Hood River Transmission Line Rebuild, Multnomah...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    81: Bonneville-Hood River Transmission Line Rebuild, Multnomah and Hood River Counties, Oregon EA-1981: Bonneville-Hood River Transmission Line Rebuild, Multnomah and Hood River ...

  16. Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mixed Swamp Forest This Set-Aside is one of the original ten SREL habitat reserve areas selected in 1968 to represent a diversity of bottomland hardwood/floodplain forest communities of a southern river swamp system. The majority of this Set-Aside is confined to the floodplain and, for the most part, these communities are relatively undisturbed, older growth mixtures of bottomland hardwood and swamp forests. Represented are aquatic, semi-aquatic, and terrestrial habitats associated with

  17. Look to the River Columbia River Opens New Opportunities for...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Volume One Film Collection Volume Two 75th Anniversary Hydropower in the Northwest Woody Guthrie Videos Strategic Direction Branding & Logos Power of the River History Book...

  18. RiverHeath Appleton, WI

    Office of Energy Efficiency and Renewable Energy (EERE)

    The goal of the project is to produce a closed loop neighborhood-wide geothermal exchange system using the river as the source of heat exchange.

  19. Employment | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Employment Openings are posted on the UGA Human Resources website. To search for employment opportunities at SREL, select Department #267 (Savannah River Ecology Laboratory). UGA HR

  20. Smith River Rancheria- 2006 Project

    Office of Energy Efficiency and Renewable Energy (EERE)

    Smith River Rancheria has a strong commitment to becoming energy self-sufficient, reduce their energy costs, and stimulate economic development in the community.

  1. SAVANNAH RIVER OPERATIONS OFFICE ...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Providing steam from this new plant, will allow for the existing biomass cogeneration facility to direct more steam to the turbine generator resulting in approximately 3-4 MW of ...

  2. River Corridor - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    300 Area 324 Building 325 Building 400 AreaFast Flux Test Facility 618-10 and 618-11 Burial Grounds 700 Area B Plant B Reactor C Reactor Canister Storage Building and Interim ...

  3. North Sky River | Open Energy Information

    Open Energy Info (EERE)

    Sky River Jump to: navigation, search Name North Sky River Facility North Sky River Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner NextEra...

  4. River and Plateau Committee

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    December 2011) Page 1 Area RAP Committee Area of Interest Issue Manager(s) (*denotes lead) Other interested committee members Focus/Product For FY2012 Framing Questions/Issues (Articulated by Issue Managers) Cross- cutting River Corridor 100 & 300 Areas * 100 B/C Area * 100 K Area * 100 N Area * 100 D & H Areas * 100 F Area * 300 Area Shelley Cimon Dale Engstrom* Liz Mattson Jean Vanni Gerry Pollet Bob Suyama Wade Riggsbee 6 RODs RI/FS and Proposed Plans to be issued between now &

  5. River and Plateau Committee

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2/15 River and Plateau Committee Priorities for advice on FY17 budget Not in priority order, numbering refers to last year's related advice points, per DOE response  (#1) The Board strongly urges DOE-Headquarters (HQ) to request full funding from Congress to meet all legal requirements of the ongoing cleanup work in FY 2016 and 2017 in addition to the following specific requests.  (#5) The Board advises DOE-RL to restore funding for removal and treatment of thousands of stored containers

  6. Moving to the Powder River Basin in search of the American dream

    SciTech Connect (OSTI)

    Buchsbaum, L.

    2007-03-15

    As the Big Three American automakers cut jobs in Michigan, Wyoming's booming but isolated coal mining industry in the Powder River Basin is trying to lure some of these dissatisfied workers. DRM has attracted workers to the benefaction plant and P & H MinePro Services working on surface mining equipment has been successful, as have Peabody's Powder River coal subsidiary and Kiewitt's Buckshin mine. 2 photos.

  7. DOE Orders Mirant Power Plant to Operate Under Limited Circumstances |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Mirant Power Plant to Operate Under Limited Circumstances DOE Orders Mirant Power Plant to Operate Under Limited Circumstances December 20, 2005 - 11:44am Addthis DOE finds emergency; determines plant will help electric reliability WASHINGTON, D.C. - Secretary of Energy Samuel W. Bodman today issued an order requiring Mirant Corporation's Potomac River Generating Station in Alexandria, Virginia (Mirant) to immediately resume limited operation. The order will help provide

  8. Kenneth W. McLeod | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    McLeod Faculty & Scientists SREL Home Kenneth W. McLeod Savannah River Ecology Laboratory P O Drawer E, Aiken, SC 29802 (803) 725-5309 office (803) 725-3309 fax kwmcleod(at)srel.uga.edu As a plant ecophysiologist, I am interested in the unique mechanisms that allow plant species to inhabit marginal habitats and which contributes to their individual distribution patterns, from large-scale continental patterns to patterns of individual trees in a forest. The elucidation of these mechanisms has

  9. Enforcement Letter, Westinghouse Savannah River Company- November 14, 2003

    Broader source: Energy.gov [DOE]

    Issued to Westinghouse Savannah River Company related to Criticality Safety Violations at the Savannah River Site

  10. Enforcement Letter, Westinghouse Savannah River Company- April 19, 2004

    Broader source: Energy.gov [DOE]

    Issued to Westinghouse Savannah River Company related to Employee Reprisal at the Savannah River Site

  11. Wild and Scenic Rivers | Open Energy Information

    Open Energy Info (EERE)

    Scenic Rivers Jump to: navigation, search Retrieved from "http:en.openei.orgwindex.php?titleWildandScenicRivers&oldid612228" Feedback Contact needs updating Image...

  12. Kings River Conservation Dist | Open Energy Information

    Open Energy Info (EERE)

    Kings River Conservation Dist Jump to: navigation, search Name: Kings River Conservation Dist Place: California Phone Number: 559-237-5567 Website: www.krcd.org Facebook: https:...

  13. Green River Biodiesel Incorporated | Open Energy Information

    Open Energy Info (EERE)

    River Biodiesel Incorporated Jump to: navigation, search Name: Green River Biodiesel Incorporated Place: Houston, Texas Zip: 77056 Product: Biodiesel project developer and...

  14. Independent Oversight Inspection, Savannah River Site Office...

    Energy Savers [EERE]

    Office - December 2009 Independent Oversight Inspection, Savannah River Site Office - December 2009 December 2009 Inspection of Nuclear Safety at the Savannah River Site Office and ...

  15. Savannah River Remediation (SRR) Expanded Staff Meeting

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Savannah River Remediation Delivering the Mission Dave Olson President and Project Manager ... Liquid Waste Operations contractor Savannah River Remediation LLC * Began work in ...

  16. Beasley Lab | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    These studies are being conducted in habitats on the Savannah River Site where the ... activities on the Savannah River Site can expose wildlife that use contaminated areas. ...

  17. Educational Materials | Savannah River Ecology Laboratory Environmenta...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Research Snapshots The Savannah River Site National Environmental Research Park The History of Radioecology Research at the Savannah River Ecology Laboratory Gray Foxes of the ...

  18. Independent Oversight Inspection, Savannah River Site - January...

    Energy Savers [EERE]

    Independent Oversight Inspection, Savannah River Site - January 2010 January 2010 Inspection of Emergency Management at the Savannah River Site This report provides the results of ...

  19. Flambeau River Biofuels Demonstration-Scale Biorefinery

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    in Wisconsin (NewPage Corporation in Wisconsin Rapids and Flambeau River Papers, LLC in Park Falls). NewPage and Flambeau River have demonstrated successful collaboration on...

  20. Beijing Haohua Rivers International Water Engineering Consulting...

    Open Energy Info (EERE)

    Haohua Rivers International Water Engineering Consulting Co Ltd Jump to: navigation, search Name: Beijing Haohua Rivers International Water Engineering Consulting Co.Ltd. Place:...

  1. Withlacoochee River Elec Coop | Open Energy Information

    Open Energy Info (EERE)

    Withlacoochee River Elec Coop Jump to: navigation, search Name: Withlacoochee River Elec Coop Place: Florida Phone Number: 352-567-5133 Website: www.wrec.net Twitter: https:...

  2. Independent Oversight Activity Report, Savannah River Site -...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - February 2014 Independent Oversight Activity Report, Savannah River Site - February 2014 February 2014 Operational Awareness Visit of the Savannah River Site...

  3. River Hydrokinetic Resource Atlas | Open Energy Information

    Open Energy Info (EERE)

    dress":"","icon":"","group":"","inlineLabel":"","visitedicon":"" Hide Map Language: English River Hydrokinetic Resource Atlas Screenshot References: EPRI1 River Atlas2 The...

  4. Voluntary Protection Program Onsite Review, Washington River...

    Energy Savers [EERE]

    Washington River Protection Solutions, LLC, Hanford - Feb 2014 Voluntary Protection Program Onsite Review, Washington River Protection Solutions, LLC, Hanford - Feb 2014 February...

  5. Savannah River Analytical Laboratories Achieve International...

    National Nuclear Security Administration (NNSA)

    Savannah River Analytical Laboratories Achieve International Standard Accreditation Tuesday, September 8, 2015 - 12:55pm Savannah River National Laboratory's FH Analytical ...

  6. Grand River Dam Authority | Open Energy Information

    Open Energy Info (EERE)

    River Dam Authority Place: Oklahoma Phone Number: 918-256-5545 Website: www.grda.com Twitter: @okgrda Facebook: https:www.facebook.compagesGrand-River-Dam-Authority...

  7. Hood River Passive House

    SciTech Connect (OSTI)

    Hales, David

    2014-01-01

    The Hood River Passive Project was developed by Root Design Build of Hood River Oregon using the Passive House Planning Package (PHPP) to meet all of the requirements for certification under the European Passive House standards. The Passive House design approach has been gaining momentum among residential designers for custom homes and BEopt modeling indicates that these designs may actually exceed the goal of the U.S. Department of Energy's (DOE) Building America program to "reduce home energy use by 30%-50% (compared to 2009 energy codes for new homes). This report documents the short term test results of the Shift House and compares the results of PHPP and BEopt modeling of the project. The design includes high R-Value assemblies, extremely tight construction, high performance doors and windows, solar thermal DHW, heat recovery ventilation, moveable external shutters and a high performance ductless mini-split heat pump. Cost analysis indicates that many of the measures implemented in this project did not meet the BA standard for cost neutrality. The ductless mini-split heat pump, lighting and advanced air leakage control were the most cost effective measures. The future challenge will be to value engineer the performance levels indicated here in modeling using production based practices at a significantly lower cost.

  8. Hood River Passive House

    SciTech Connect (OSTI)

    Hales, D.

    2014-01-01

    The Hood River Passive Project was developed by Root Design Build of Hood River Oregon using the Passive House Planning Package (PHPP) to meet all of the requirements for certification under the European Passive House standards. The Passive House design approach has been gaining momentum among residential designers for custom homes and BEopt modeling indicates that these designs may actually exceed the goal of the U.S. Department of Energy's (DOE) Building America program to reduce home energy use by 30%-50% (compared to 2009 energy codes for new homes). This report documents the short term test results of the Shift House and compares the results of PHPP and BEopt modeling of the project. The design includes high R-Value assemblies, extremely tight construction, high performance doors and windows, solar thermal DHW, heat recovery ventilation, moveable external shutters and a high performance ductless mini-split heat pump. Cost analysis indicates that many of the measures implemented in this project did not meet the BA standard for cost neutrality. The ductless mini-split heat pump, lighting and advanced air leakage control were the most cost effective measures. The future challenge will be to value engineer the performance levels indicated here in modeling using production based practices at a significantly lower cost.

  9. RIVER PROTECTION PROJECT SYSTEM PLAN

    SciTech Connect (OSTI)

    CERTA PJ

    2008-07-10

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, the ORP is responsible for the retrieval, treatment, and disposal of the approximately 57 million gallons of radioactive waste contained in the Hanford Site waste tanks and closure of all the tanks and associated facilities. The previous revision of the System Plan was issued in September 2003. ORP has approved a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. The ORP has established contracts to implement this strategy to establish a basic capability to complete the overall mission. The current strategy for completion of the mission uses a number of interrelated activities. The ORP will reduce risk to the environment posed by tank wastes by: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) for treatment and disposal; (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) and about half of the low-activity waste (LAW) contained in the tank farms, and maximizing its capability and capacity; (3) Developing and deploying supplemental treatment capability or a second WTP LAW Facility that can safely treat about half of the LAW contained in the tank farms; (4) Developing and deploying treatment and packaging capability for transuranic (TRU) tank waste for shipment to and disposal at the Waste Isolation Pilot Plant (WIPP); (5) Deploying interim storage capacity for the immobilized HLW and shipping that waste to Yucca Mountain for disposal; (6) Operating the Integrated Disposal Facility for the disposal of immobilized LAW, along with the associated secondary waste, (7) Closing the SST and DST tank farms, ancillary facilities, and al1 waste

  10. RIVER PROTECTION PROJECT SYSTEM PLAN

    SciTech Connect (OSTI)

    CERTA PJ; KIRKBRIDE RA; HOHL TM; EMPEY PA; WELLS MN

    2009-09-15

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and disposal

  11. Savannah River Site environmental report for 1988

    SciTech Connect (OSTI)

    Cummins, C.L.; Hetrick, C.S.; Stevenson, D.A.; Davis, H.A.; Martin, D.K.; Todd, J.L.

    1989-01-01

    During 1988, as in previous years, Savannah River Site operations had no adverse impact on the general public or the environment. Based on the SRS site-specific code, the maximum radiation dose commitment to a hypothetical individual at the SRS boundary from 1988 SRS atmospheric releases of radioactive materials was 0.46 millirem (mrem) (0.0046 millisievert (mSv)). To obtain the maximum dose, an individual would have had to reside on the SRS boundary at the location of highest dose for 24 hours per day, 365 days per year, consume a maximum amount of foliage and meat which originated from the general vicinity of the plant boundary, and drink a maximum amount of milk from cows grazing at the plant boundary. The average radiation dose commitment from atmospheric releases to the hypothetical individual on the SRS boundary in 1988 was 0.18 mrem (0. 0018 mSv). This person, unlike the maximumly exposed individual, consumes an average amount of foliage, meat, and milk which originated from the foliage and animals living at the plant boundary.

  12. Waste immobilization process development at the Savannah River Plant

    SciTech Connect (OSTI)

    Charlesworth, D L

    1986-01-01

    Processes to immobilize various wasteforms, including waste salt solution, transuranic waste, and low-level incinerator ash, are being developed. Wasteform characteristics, process and equipment details, and results from field/pilot tests and mathematical modeling studies are discussed.

  13. MAJOR FOREST COMMUNITY TYPES OF THE SAVANNAH RIVER PLANT: AFIELD

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DESCRIPTIONS Loblolly pine-sweet gum-broom sedge Loblolly pine-black cherry- Japanese honeysuckle . . Loblolly pine-sweet gum-red bay Loblolly pine-swamp gum-naked withe-rod . . ...

  14. SAVANNAH RIVER PLANT I FABRICATION AND TESTING HISTORY

    Office of Legacy Management (LM)

    Delaware UNITED STATES ATOMIC ENERGY COMMISSION U. S. CONTRACT NO. ... Supply Facilities Cooling Water System Partitions, Enclosures and Storage Facilities Main Barricade ...

  15. Bagdad Plant

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bagdad Plant 585 Silicon Drive Leechburg, P A 15656 * ATI Allegheny "'I Ludlum e-mail: Raymond.Polinski@ATImetals.com Mr. James Raba U.S. Department of Energy Office of Energy ...

  16. Better Buildings, Better Plants: Volvo Boosting Energy Efficiency at Truck Manufacturing Facility

    Broader source: Energy.gov [DOE]

    Find out how Volvo Group North America has achieved energy savings at its New River facility in Virginia as part of the Energy Department's Better Buildings, Better Plants program.

  17. Savannah River Site generic data base development

    SciTech Connect (OSTI)

    Blanchard , A.

    2000-01-04

    This report describes the results of a project to improve the generic component failure database for the Savannah River Site (SRS). Additionally, guidelines were developed further for more advanced applications of database values. A representative list of components and failure modes for SRS risk models was generated by reviewing existing safety analyses and component failure data bases and from suggestions from SRS safety analysts. Then sources of data or failure rate estimates were identified and reviewed for applicability. A major source of information was the Nuclear Computerized Library for Assessing Reactor Reliability, or NUCLARR. This source includes an extensive collection of failure data and failure rate estimates for commercial nuclear power plants. A recent Idaho National Engineering Laboratory report on failure data from the Idaho Chemical Processing Plant was also reviewed. From these and other recent sources, failure data and failure rate estimates were collected for the components and failure modes of interest. For each component failure mode, this information was aggregated to obtain a recommended generic failure rate distribution (mean and error factor based on a lognormal distribution). Results are presented in a table in this report. A major difference between generic database and previous efforts is that this effort estimates failure rates based on actual data (failure events) rather than on existing failure rate estimates. This effort was successful in that over 75% of the results are now based on actual data. Also included is a section on guidelines for more advanced applications of failure rate data. This report describes the results of a project to improve the generic component failure database for the Savannah River site (SRS). Additionally, guidelines were developed further for more advanced applications of database values.

  18. Concept Paper Savannah River Nuclear Solutions, LLC Savannah River Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Paper Savannah River Nuclear Solutions, LLC Savannah River Site Aiken, SC 29808 Michael S. Navetta, PE Manager- Energy Park Initiative (803) 952-8806 michael.navetta@srs.gov U.S. EnergyFreedomCenter PREDECISIONAL DRAFT Today We Can Start To Unshackle America Decades of debate for ending America's dependence on foreign fossil fuels, climate change and environmentally positive energy has produced a myriad of technologies that independently offer a partial solution. Applying existing technologies

  19. Natural Resources Defense Council Consent Decree, May 26, 1988 Summary

    Office of Environmental Management (EM)

    Decree No. 1:85-2583-6 State South Carolina Agreement Type Consent Decree Legal Driver(s) RCRA Scope Summary Establish guidelines for the closure of certain facilities at the Savannah River Plant. Parties DOE (SRP); State of South Carolina (Department of Health and Environmental Control); US DOJ; Natural Resources Defense Council; Energy Research Foundation; Assistant U.S. Attorney of the District of South Carolina; South Carolina League of Women Voters Date 5/26/1988 SCOPE * Establish

  20. Table 2. Ten largest plants by generation capacity, 2014

    U.S. Energy Information Administration (EIA) Indexed Site

    Delaware" ,"Plant","Primary energy source","Operating company","Net summer capacity (MW)" 1,"Hay Road","Natural gas","Calpine Mid-Atlantic Generation LLC",1136 2,"Edge Moor","Natural gas","Calpine Mid-Atlantic Generation LLC",725 3,"Indian River Generating Station","Coal","Indian River Operations Inc",426.4 4,"Delaware City Plant","Other

  1. Raft River Idaho Magnetotelluric Data

    SciTech Connect (OSTI)

    Gregory Nash

    2015-05-13

    Raw magnetotelluric (MT) data covering the geothermal system at Raft River, Idaho. The data was acquired by Quantec Geoscience. This is a zipped file containing .edi raw MT data files.

  2. Microsoft Word - EIA-111 Form for 2018 FINAL 071015 with Picklists...

    Gasoline and Diesel Fuel Update (EIA)

    hours EIA-111 QUARTERLY ELECTRICITY IMPORTS AND EXPORTS REPORT ... Puget Sound Energy, Inc. PSEI Salt River Project Agricultural Improvement and Power District SRP Seattle City ...

  3. GASIFICATION PLANT COST AND PERFORMANCE OPTIMIZATION

    SciTech Connect (OSTI)

    Samuel S. Tam

    2002-05-01

    The goal of this series of design and estimating efforts was to start from the as-built design and actual operating data from the DOE sponsored Wabash River Coal Gasification Repowering Project and to develop optimized designs for several coal and petroleum coke IGCC power and coproduction projects. First, the team developed a design for a grass-roots plant equivalent to the Wabash River Coal Gasification Repowering Project to provide a starting point and a detailed mid-year 2000 cost estimate based on the actual as-built plant design and subsequent modifications (Subtask 1.1). This unoptimized plant has a thermal efficiency of 38.3% (HHV) and a mid-year 2000 EPC cost of 1,681 $/kW. This design was enlarged and modified to become a Petroleum Coke IGCC Coproduction Plant (Subtask 1.2) that produces hydrogen, industrial grade steam, and fuel gas for an adjacent Gulf Coast petroleum refinery in addition to export power. A structured Value Improving Practices (VIP) approach was applied to reduce costs and improve performance. The base case (Subtask 1.3) Optimized Petroleum Coke IGCC Coproduction Plant increased the power output by 16% and reduced the plant cost by 23%. The study looked at several options for gasifier sparing to enhance availability. Subtask 1.9 produced a detailed report on this availability analyses study. The Subtask 1.3 Next Plant, which retains the preferred spare gasification train approach, only reduced the cost by about 21%, but it has the highest availability (94.6%) and produces power at 30 $/MW-hr (at a 12% ROI). Thus, such a coke-fueled IGCC coproduction plant could fill a near term niche market. In all cases, the emissions performance of these plants is superior to the Wabash River project. Subtasks 1.5A and B developed designs for single-train coal and coke-fueled power plants. This side-by-side comparison of these plants, which contain the Subtask 1.3 VIP enhancements, showed their similarity both in design and cost (1,318 $/kW for the

  4. Dayao County Yupao River BasDayao County Yupao River Basin Hydro...

    Open Energy Info (EERE)

    Dayao County Yupao River BasDayao County Yupao River Basin Hydro electricity Development Co Ltd in Jump to: navigation, search Name: Dayao County Yupao River BasDayao County Yupao...

  5. DOE to Extend Savannah River Nuclear Solutions Contract at Savannah River

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Site to September 2016 | Department of Energy to Extend Savannah River Nuclear Solutions Contract at Savannah River Site to September 2016 DOE to Extend Savannah River Nuclear Solutions Contract at Savannah River Site to September 2016 September 6, 2012 - 12:00pm Addthis Media Contact Bill Taylor 803-952-8564 bill.taylor@srs.gov Aiken, SC -- The Department of Energy's (DOE) Savannah River Operations Office today exercised its option to extend the current Savannah River Site Management and

  6. BLM Humboldt River Field Office | Open Energy Information

    Open Energy Info (EERE)

    River Field Office Jump to: navigation, search Name: BLM Humboldt River Field Office Abbreviation: Humboldt River Address: 5100 E. Winnemucca Blvd. Place: Winnemucca, Nevada Zip:...

  7. Voluntary Protection Program Onsite Review, Savannah River Remediation...

    Office of Environmental Management (EM)

    River Remediation, Llc, Liquid Waste Contract, Savannah River Site - November 2014 Voluntary Protection Program Onsite Review, Savannah River Remediation, Llc, Liquid Waste ...

  8. Savannah River Site: Plutonium Preparation Project (PuPP) at...

    Energy Savers [EERE]

    Site: Plutonium Preparation Project (PuPP) at Savannah River Site Savannah River Site: Plutonium Preparation Project (PuPP) at Savannah River Site Full Document and Summary ...

  9. Savannah River Site - L-Area Southern Groundwater | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    L-Area Southern Groundwater Savannah River Site - L-Area Southern Groundwater January 1, ... InstallationName, State: Savannah River Site, SC Responsible DOE Office: Savannah River ...

  10. Savannah River Site - R-Area Groundwater Operable Unit | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    R-Area Groundwater Operable Unit Savannah River Site - R-Area Groundwater Operable Unit ... InstallationName, State: Savannah River Site, SC Responsible DOE Office: Savannah River ...

  11. PP-366 Twin Rivers Paper Company, Inc. | Department of Energy

    Office of Environmental Management (EM)

    6 Twin Rivers Paper Company, Inc. PP-366 Twin Rivers Paper Company, Inc. Presidential Permit authorizing Twin Rivers Paper Company, Inc. to construct, operate, and maintain ...

  12. Flambeau River Biofuels Demonstration-Scale Biorefinery | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Flambeau River Biofuels Demonstration-Scale Biorefinery Flambeau River Biofuels Demonstration-Scale Biorefinery The Flambeau River biorefinery will be added to an existing pulp and ...

  13. Independent Oversight Activity Report, Office of River Protection...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office of River Protection - May 2013 Independent Oversight Activity Report, Office of River Protection - May 2013 May 2013 Operational Awareness Visit at the Office of River...

  14. EA-1692: Red River Environmental Products, LLC Activated Carbon...

    Office of Environmental Management (EM)

    2: Red River Environmental Products, LLC Activated Carbon Manufacturing Facility, Red River Parish, LA EA-1692: Red River Environmental Products, LLC Activated Carbon Manufacturing ...

  15. EA-273 Rainy River Energy Corporation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rainy River Energy Corporation EA-273 Rainy River Energy Corporation Order authorizing Rainy River Energy Corporation to export electric energy to Canada. PDF icon EA-273 Rainy ...

  16. Snake River Plain Geothermal Region | Open Energy Information

    Open Energy Info (EERE)

    Survey At Snake River Plain Region (DOE GTP) Micro-Earthquake At Snake River Plain Geothermal Region (1976) Reflection Survey At Snake River Plain Region (DOE GTP)...

  17. Savannah River National Laboratory (SRNL) | Open Energy Information

    Open Energy Info (EERE)

    (Redirected from Savannah River National Laboratory) Jump to: navigation, search Logo: Savannah River National Laboratory Name: Savannah River National Laboratory Place: Aiken,...

  18. Conceptual design of the Clinch River Breeder Reactor spent-fuel shipping cask

    SciTech Connect (OSTI)

    Pope, R B; Diggs, J M [eds.

    1982-04-01

    Details of a baseline conceptual design of a spent fuel shipping cask for the Clinch River Breeder Reactor (CRBR) are presented including an assessment of shielding, structural, thermal, fabrication and cask/plant interfacing problems. A basis for continued cask development and for new technological development is established. Alternates to the baseline design are briefly presented. Estimates of development schedules, cask utilization and cost schedules, and of personnel dose commitments during CRBR in-plant handling of the cask are also presented.

  19. Air-cooled condensers eliminate plant water use

    SciTech Connect (OSTI)

    Wurtz, W.; Peltier, R.

    2008-09-15

    River or ocean water has been the mainstay for condensing turbine exhaust steam since the first steam turbine began generating electricity. A primary challenge facing today's plant developers, especially in drought-prone regions, is incorporating processes that reduce plant water use and consumption. One solution is to shed the conventional mindset that once-through cooling is the only option and adopt dry cooling technologies that reduce plant water use from a flood to a few sips. A case study at the Astoria Energy plant, New York City is described. 14 figs.

  20. Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Craig's Pond and Sarracenia Bay Sarracenia Bay (upper left) and Craig's Pond The 142.9-acre (57.84 ha) Craig’s Pond and Sarracenia Bay Set-Aside contains the paired Craig’s Pond and Sarracenia Bay which are semi-permanent, open-water, aquatic/herbaceous Carolina bays. A partial 200 m buffer area comprised of natural and recently planted plantation pines, mixed pine/hardwoods, and sandhill scrub oak/pine communities surrounds these bays. Craig’s Pond is one of the largest true bays on the SRS,

  1. Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ginger's Bay This relatively small 38.5-acre (15.6 ha) Set-Aside is comprised of the temporary pond Ginger’s Bay and a partial 200-m buffer area of planted pines, mixed pine/hardwood, and upland-to-mesic hardwood communities. The bay has virtually no buffer on the northwest side that borders Road A. Ginger’s Bay is 3.7 acres (1.5 ha) and is a relatively intact bay-like wetland depression which lacks the morphology and orientation of a true Carolina bay. Like Rainbow Bay (Area #16), this

  2. Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    09 This small 14.2-acre (5.8 ha) relatively disturbed, rectangularly-shaped Set-Aside is comprised of a section of an abandoned field (agricultural field numbered 3-409 in 1951) and a strip of mixed pines bordering Road 2.The section of Field 3-409 contained within this Set-Aside has undergone plant community succession from an herbaceous old-field in 1951 to a present day pine forest habitat. The Field 3-409 Set-Aside represents an abandoned, old-field community that has undergone natural

  3. Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Loblolly Pine Stand The 22-acre (8.9 ha) Loblolly Pine Stand Set-Aside is one of the original ten SREL habitat reserve areas which were selected to complement the old-field habitat/plant succession studies at Field 3-412 (Area #1) and Field 3-409 (Area #28). Known to researchers as Field 9-111, this Area is a small, square-shaped Set-Aside which has undergone secondary successsion for the past 46 years. Presently, the Loblolly Pine Stand Set-Aside is an undisturbed pine forest. Unlike Field

  4. Natural Gas Resources of the Greater Green River and Wind River...

    Office of Scientific and Technical Information (OSTI)

    Technical Report: Natural Gas Resources of the Greater Green River and Wind River Basins ... Resource Type: Technical Report Research Org: National Energy Technology Laboratory, ...

  5. Assessment of the Fishery Improvement Opportunities on the Pend Oreille River, 1988 Annual Report.

    SciTech Connect (OSTI)

    Barber, Michael R.; Willms, Roger A.; Scholz, Allan T.

    1989-10-01

    The purpose of this study is to assess the fishery improvement opportunities on the Box Canyon portion of the Pend Oreille River. This report contains the findings of the first year of the study. Chinook salmon (Oncorhynchus tshawytscha (Walbaum)) and steelhead (Oncorhynchus mykiss (Richardson)) were present in the Pend Oreille River prior to the construction of Grand Coulee Dam. The river also contained native cutthroat trout (Oncorhynchus clarki (Richardson)), bull trout (Salvelinus confluentus (Walbaum)) and mountain whitefish (Prosopium williamsoni (Girard)). Rainbow trout were planted in the river and some grew to lengths in excess of 30 inches. With the construction of Box Canyon Dam, in 1955, the most productive section of the river was inundated. Following the construction of the dam the trout fishery declined and the populations of spiny ray fish and rough fish increased. The objectives of the first year of the study were to determine the relative abundance of each species in the river and sloughs; the population levels in fish in the river and four selected tributaries; fish growth rates; the feeding habits and abundance of preferred prey; the migration patterns; and the total fishing pressure, catch per unit effort, and total harvest by conducting a year-round creel survey. 132 refs.

  6. Palladium on kieselguhr

    SciTech Connect (OSTI)

    Mosley, W.C.

    1988-01-11

    Palladium supported in kieselguhr (Pd/K) is a candidate material for processing of hydrogen isotopes at Savannah River Laboratory (SRL) and Savannah River Plant (SRP). Kieselguhr is a porous, sedimentary rock composed of silicified skeletal remains of single-celled aquatic plants called diatoms. SRL has developed a process for deposition of palladium on kieselguhr particles using immersion in an ammonical palladium chloride solution followed by heating in hydrogen to decompose the chloride to metallic palladium. The goal is to produce Pd/K particles with less than 250 ppm chlorine.

  7. WABASH RIVER COAL GASIFICATION REPOWERING PROJECT

    SciTech Connect (OSTI)

    Unknown

    2000-09-01

    The close of 1999 marked the completion of the Demonstration Period of the Wabash River Coal Gasification Repowering Project. This Final Report summarizes the engineering and construction phases and details the learning experiences from the first four years of commercial operation that made up the Demonstration Period under Department of Energy (DOE) Cooperative Agreement DE-FC21-92MC29310. This 262 MWe project is a joint venture of Global Energy Inc. (Global acquired Destec Energy's gasification assets from Dynegy in 1999) and PSI Energy, a part of Cinergy Corp. The Joint Venture was formed to participate in the Department of Energy's Clean Coal Technology (CCT) program and to demonstrate coal gasification repowering of an existing generating unit impacted by the Clean Air Act Amendments. The participants jointly developed, separately designed, constructed, own, and are now operating an integrated coal gasification combined-cycle power plant, using Global Energy's E-Gas{trademark} technology (E-Gas{trademark} is the name given to the former Destec technology developed by Dow, Destec, and Dynegy). The E-Gas{trademark} process is integrated with a new General Electric 7FA combustion turbine generator and a heat recovery steam generator in the repowering of a 1950's-vintage Westinghouse steam turbine generator using some pre-existing coal handling facilities, interconnections, and other auxiliaries. The gasification facility utilizes local high sulfur coals (up to 5.9% sulfur) and produces synthetic gas (syngas), sulfur and slag by-products. The Project has the distinction of being the largest single train coal gasification combined-cycle plant in the Western Hemisphere and is the cleanest coal-fired plant of any type in the world. The Project was the first of the CCT integrated gasification combined-cycle (IGCC) projects to achieve commercial operation.

  8. THE SNAKE RIVER PLAIN AQUIFER THE SNAKE RIVER PLAIN AQUIFER

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    aquifer THE INL & THE SNAKE RIVER PLAIN AQUIFER THE SNAKE RIVER PLAIN AQUIFER underneath the Idaho National Laboratory is one of the most productive groundwater resources in the U.S. Each year about 2 million acre-feet of water is drawn from the aquifer. Approximately 95 percent of the water withdrawn from the aquifer is used for irrigation, 3 per- cent for domestic water, and 2 percent for industrial purposes. The aquifer is the primary water source for more than 280,000 people in

  9. Waste Treatment and Immobilation Plant HLW Waste Vitrification Facility

    Office of Environmental Management (EM)

    6 Technology Readiness Assessment for the Waste Treatment and Immobilization Plant (WTP) HLW Waste Vitrification Facility L. Holton D. Alexander C. Babel H. Sutter J. Young August 2007 Prepared by the U.S. Department of Energy Office of River Protection Richland, Washington, 99352 07-DESIGN-046 Technology Readiness Assessment for the Waste Treatment and Immobilization Plant (WTP) HLW Waste Vitrification Facility L. Holton D. Alexander C. Babel H. Sutter J. Young August 2007 Prepared by the U.S.

  10. Geothermal Power Generation Plant; 2010 Geothermal Technology Program Peer

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Review Report | Department of Energy Power Generation Plant; 2010 Geothermal Technology Program Peer Review Report Geothermal Power Generation Plant; 2010 Geothermal Technology Program Peer Review Report DOE 2010 Geothermal Technologies Program Peer Review adse_003_lund.pdf (189.07 KB) More Documents & Publications Feasibility of EGS Development at Bradys Hot Springs, Nevada Concept Testing and Development at the Raft River Geothermal Field, Idaho Detecting Fractures Using Technology

  11. DOE Orders Mirant Power Plant to Operate Under Limited Circumstances |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Orders Mirant Power Plant to Operate Under Limited Circumstances DOE Orders Mirant Power Plant to Operate Under Limited Circumstances Docket No. EO-05-01. Order No. 202-05-3: Secretary of Energy Samuel W. Bodman today issued an order requiring Mirant Corporation's Potomac River Generating Station in Alexandria, Virginia (Mirant) to immediately resume limited operation. The order will help provide electric reliability for Washington, D.C., and will do so at the lowest

  12. Waste Isolation Pilot Plant Technical Assessment Team Report Revision 0 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Technical Assessment Team Report Revision 0 Waste Isolation Pilot Plant Technical Assessment Team Report Revision 0 This report provides the results of the Waste Isolation Pilot Plant (WIPP) technical assessment led by the Savannah River National Laboratory and conducted by a team of experts in pertinent disciplines from SRNL and Lawrence Livermore National Laboratory (LLNL), Oak Ridge National Laboratory (ORNL), Pacific Northwest National Laboratory (PNNL), and Sandia

  13. Independent Oversight Review, Waste Treatment and Immobilization Plant -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    January 2013 | Department of Energy January 2013 Independent Oversight Review, Waste Treatment and Immobilization Plant - January 2013 January 2013 Review of the Hanford Waste Treatment and Immobilization Plant Black-Cell and Hard-To-Reach Pipe Spools Procurement Process and the Office of River Protection Audit of That Process The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted a concurrent independent review with

  14. Grays River Watershed Geomorphic Analysis

    SciTech Connect (OSTI)

    Geist, David R.

    2005-04-30

    This investigation, completed for the Pacific Northwest National Laboratory (PNNL), is part of the Grays River Watershed and Biological Assessment commissioned by Bonneville Power Administration under project number 2003-013-00 to assess impacts on salmon habitat in the upper Grays River watershed and present recommendations for habitat improvement. This report presents the findings of the geomorphic assessment and is intended to support the overall PNNL project by evaluating the following: 􀂃 The effects of historical and current land use practices on erosion and sedimentation within the channel network 􀂃 The ways in which these effects have influenced the sediment budget of the upper watershed 􀂃 The resulting responses in the main stem Grays River upstream of State Highway 4 􀂃 The past and future implications for salmon habi

  15. Microsoft Word - SRP on Application of Engineering and Technical...

    Office of Environmental Management (EM)

    ... (DOE-STD-1066-99); Fire Protection Requirements from the International Building Code (IBC); Applicable National Fire Protection Association (NFPA) Codes and ...

  16. Microsoft Word - SDS SRP 4 14 2014.docx

    Office of Environmental Management (EM)

    The safety-in-design related SRPs follows the CD process and address key functional areas of project management, engineering and design, safety, environment, security, and quality ...

  17. Standard Review Plan (SRP) Modules | Department of Energy

    Energy Savers [EERE]

    Design Expectations Report Technology Readiness Assessment Report External Technical Review Report Preparation for Facility Operations RM Compilation of TRA Summaries Compilation ...

  18. 2,"Big Bend Dam","Hydroelectric","USCE-Missouri River District",520

    U.S. Energy Information Administration (EIA) Indexed Site

    Dakota" ,"Plant","Primary energy source","Operating company","Net summer capacity (MW)" 1,"Oahe","Hydroelectric","USCE-Missouri River District",714 2,"Big Bend Dam","Hydroelectric","USCE-Missouri River District",520 3,"Big Stone","Coal","Otter Tail Power Co",475.6 4,"Fort Randall","Hydroelectric","USCE-Missouri River District",360

  19. Enforcement Letter, Savannah River Ecology Laboratory- June 7, 2000

    Broader source: Energy.gov [DOE]

    Issued to Savannah River Ecology Laboratory related to Radioactive Material Control Deficiencies at the Savannah River Site

  20. Conceptual Model At Raft River Geothermal Area (1988) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Conceptual Model At Raft River Geothermal Area (1988) Exploration Activity Details Location Raft River...

  1. Conceptual Model At Raft River Geothermal Area (1977) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Conceptual Model At Raft River Geothermal Area (1977) Exploration Activity Details Location Raft River...

  2. Field Mapping At Raft River Geothermal Area (1977) | Open Energy...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Field Mapping At Raft River Geothermal Area (1977) Exploration Activity Details Location Raft River...

  3. Geophysical Method At Raft River Geothermal Area (1975) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geophysical Method At Raft River Geothermal Area (1975) Exploration Activity Details Location Raft River...

  4. Field Mapping At Raft River Geothermal Area (1980) | Open Energy...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Field Mapping At Raft River Geothermal Area (1980) Exploration Activity Details Location Raft River...

  5. Microearthquake surveys of Snake River plain and Northwest Basin...

    Open Energy Info (EERE)

    microearthquakes; Nevada; North America; passive systems; Pershing County Nevada; Raft River; reservoir rocks; seismic methods; seismicity; seismology; Snake River plain;...

  6. Core Analysis At Raft River Geothermal Area (1981) | Open Energy...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Core Analysis At Raft River Geothermal Area (1981) Exploration Activity Details Location Raft River...

  7. Field Mapping At Raft River Geothermal Area (1990) | Open Energy...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Field Mapping At Raft River Geothermal Area (1990) Exploration Activity Details Location Raft River...

  8. Conceptual Model At Raft River Geothermal Area (1987) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Conceptual Model At Raft River Geothermal Area (1987) Exploration Activity Details Location Raft River...

  9. Conceptual Model At Raft River Geothermal Area (1990) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Conceptual Model At Raft River Geothermal Area (1990) Exploration Activity Details Location Raft River...

  10. Conceptual Model At Raft River Geothermal Area (1983) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Conceptual Model At Raft River Geothermal Area (1983) Exploration Activity Details Location Raft River...

  11. Aeromagnetic Survey At Raft River Geothermal Area (1981) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Aeromagnetic Survey At Raft River Geothermal Area (1981) Exploration Activity Details Location Raft River...

  12. Core Analysis At Raft River Geothermal Area (1976) | Open Energy...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Core Analysis At Raft River Geothermal Area (1976) Exploration Activity Details Location Raft River...

  13. Geophysical Method At Raft River Geothermal Area (1977) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geophysical Method At Raft River Geothermal Area (1977) Exploration Activity Details Location Raft River...

  14. Exploratory Well At Raft River Geothermal Area (1977) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Exploratory Well At Raft River Geothermal Area (1977) Exploration Activity Details Location Raft River...

  15. Exploratory Well At Raft River Geothermal Area (1975) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Exploratory Well At Raft River Geothermal Area (1975) Exploration Activity Details Location Raft River...

  16. Tracer Testing At Raft River Geothermal Area (1983) | Open Energy...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Tracer Testing At Raft River Geothermal Area (1983) Exploration Activity Details Location Raft River...

  17. Aeromagnetic Survey At Raft River Geothermal Area (1978) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Aeromagnetic Survey At Raft River Geothermal Area (1978) Exploration Activity Details Location Raft River...

  18. Platte River Power Authority | Open Energy Information

    Open Energy Info (EERE)

    search Name: Platte River Power Authority Place: Colorado Website: www.prpa.org Facebook: https:www.facebook.comPlatteRiverPower Outage Hotline: 1-888-748-5113 References:...

  19. Beasley Lab | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AND DISEASE DYNAMICS OF WILD PIGS ON THE SAVANNAH RIVER SITE SREL Collaborators: Jim ... At the Savannah River Site alone between 30 and 40 pigs are struck by vehicles each year, ...

  20. Research | Savannah River National Environmental Park

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Over the years research on the Savannah River NERP has provided many insights into human ... research on the SRS and the establishment of the Savannah River Ecology Laboratory (SREL). ...

  1. Overview | Savannah River National Environmental Park

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Park Overview The Savannah River Site is an 803-km2 Department of Energy (DOE) facility ... of South Carolina, near Aiken, SC. The site is bordered on one side by the Savannah River. ...

  2. An Inside Look at River Corridor

    Broader source: Energy.gov [DOE]

    In the seventh chapter of The Handford Story, the Energy Department takes a look at the River Corridor -- a 50-mile stretch of the Columbia River that flows through the Hanford site in southeast...

  3. Preliminary Notice of Violation, Westinghouse Savannah River...

    Broader source: Energy.gov (indexed) [DOE]

    River Company - EA-97-11 Preliminary Notice of Violation, Westinghouse Savannah River Company - EA 98-09 Preliminary Notice of Violation, Kaiser-Hill Company, LLC - EA-1999-06...

  4. New Savannah River Site Deputy Manager Named

    Broader source: Energy.gov [DOE]

    AIKEN, S.C. – DOE’s Savannah River Operations Office selected Terrel “Terry” J. Spears as the deputy manager of the Savannah River Site (SRS) this month.

  5. Columbia River Component Data Evaluation Summary Report

    SciTech Connect (OSTI)

    C.S. Cearlock

    2006-08-02

    The purpose of the Columbia River Component Data Compilation and Evaluation task was to compile, review, and evaluate existing information for constituents that may have been released to the Columbia River due to Hanford Site operations. Through this effort an extensive compilation of information pertaining to Hanford Site-related contaminants released to the Columbia River has been completed for almost 965 km of the river.

  6. Savannah River Site - TNX | Department of Energy

    Office of Environmental Management (EM)

    TNX Savannah River Site - TNX January 1, 2013 - 12:00pm Addthis US Department of Energy Groundwater Database Groundwater Master Report InstallationName, State: Savannah River Site, SC Responsible DOE Office: Savannah River Site Plume Name: TNX Remediation Contractor: Savannah River Nuclear Solutions, LLC PBS Number: 30 Report Last Updated: 2013 Contaminants Halogenated VOCs/SVOCs Present?: Yes VOC Name Concentration (ppb) Regulatory Driver Cleanup Requirement TCE 110 Yes 5 Fuel Present? No

  7. Prescott Airport Solar Plant Solar Power Plant | Open Energy...

    Open Energy Info (EERE)

    Prescott Airport Solar Plant Solar Power Plant Jump to: navigation, search Name Prescott Airport Solar Plant Solar Power Plant Facility Prescott Airport Solar Plant Sector Solar...

  8. Deming Solar Plant Solar Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Deming Solar Plant Solar Power Plant Jump to: navigation, search Name Deming Solar Plant Solar Power Plant Facility Deming Solar Plant Sector Solar Facility Type Photovoltaic...

  9. Solana Generating Plant Solar Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Solana Generating Plant Solar Power Plant Jump to: navigation, search Name Solana Generating Plant Solar Power Plant Facility Solana Generating Plant Sector Solar Facility Type...

  10. Snake River Geothermal Consortium FORGE Logo | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Logo Snake River Geothermal Consortium FORGE Logo Snake River Geothermal Consortium FORGE Logo More Documents & Publications Snake River Geothermal Consortium FORGE Logo Snake River Geothermal Consortium FORGE Map Snake River Geothermal Consortium FORGE Logo Milford, Utah FORGE Logo Snake River Geothermal Consortium FORGE Logo West Flank FORGE Logo

  11. Snake River Geothermal Consortium FORGE Map | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Map Snake River Geothermal Consortium FORGE Map Snake River Geothermal Consortium FORGE Map More Documents & Publications Snake River Geothermal Consortium FORGE Map Snake River Geothermal Consortium FORGE Logo Snake River Geothermal Consortium FORGE Map Milford, Utah FORGE Map Snake River Geothermal Consortium FORGE Map Newberry FORGE Map

  12. Cleaning Up the Hanford River Corridor and Improving Site Operations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Americium Recovery Facility (The "McCluskey Room") Presented to River and Plateau Committee Hanford Advisory Board John Silko U.S Department of Energy Richland Operations Office 1 2 Americium Recovery Facility (The "McCluskey Room") 200 Area Central Plateau looking west (June 16, 2005) 3 Americium Recovery Facility (The "McCluskey Room") Plutonium Finishing Plant (PFP) before construction of 242-Z Americium Recovery Facility (ARF); also known as "McCluskey

  13. Bayer Material Science (TRL 1 2 3 System)- River Devices to Recover Energy with Advanced Materials(River DREAM)

    Broader source: Energy.gov [DOE]

    Bayer Material Science (TRL 1 2 3 System) - River Devices to Recover Energy with Advanced Materials(River DREAM)

  14. Failure mode analysis for lime/limestone FGD systems. Volume 3. Plant profiles. Part 2

    SciTech Connect (OSTI)

    Kenney, S.M.; Rosenberg, H.S.; Nilsson, L.I.O.; Oxley, J.H.

    1984-08-01

    Plant profiles are given for the following plants: Tombigbee 2, 3; Apache 2, 3; Cholla 1, 2; Four Corners 1, 2, 3; Laramie River 1; Green 1, 2; Duck Creek 1; Craig 1, 2; Conesville 5, 6; Coal Creek 1, 2; Elrama 1, 2, 3, 4; and Phillips 1, 2, 3, 4, 5, 6. (DLC)

  15. Better Plants

    Broader source: Energy.gov [DOE]

    Leading manufacturers and industrial-scale energy-using organizations demonstrate their commitment to improving energy performance by signing a voluntary pledge to reduce their energy intensity by 25% over a ten year period. The U.S. Department of Energys Better Buildings, Better Plants Program is an important partnership which consists of approximately 150 industrial companies, representing about 2,300 facilities and close to 11% of the total U.S. manufacturing energy footprint as well as several water and wastewater treatment organizations.

  16. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Charging Rate Incentive - The Salt River Project (SRP) SRP offers an experimental time-of-use (TOU) electricity rate for the first 10,000 customers with a qualified PEV. The TOU rate is for the super off-peak hours between 11pm and 5am daily. Participation is subject to certain equipment availability and other restrictions. For more information, see the SRP Electric Vehicle Price Plan website. Point of Contact Kathy Knoop Principal Environmental Scientist The Salt River Project Phone: (602)

  17. WABASH RIVER INTEGRATED METHANOL AND POWER PRODUCTION FROM CLEAN COAL TECHNOLOGIES (IMPPCCT)

    SciTech Connect (OSTI)

    Albert Tsang

    2003-03-14

    The Wabash River Integrated Methanol and Power Production from Clean Coal Technologies (IMPPCCT) project is evaluating integrated electrical power generation and methanol production through clean coal technologies. The project is conducted by a multi-industry team lead by Gasification Engineering Corporation (GEC), a company of Global Energy Inc., and supported by Air Products and Chemicals, Inc., Dow Chemical Company, Dow Corning Corporation, Methanex Corporation, and Siemens Westinghouse Power Corporation. Three project phases are planned for execution over several years, including: (1) Feasibility study and conceptual design for an integrated demonstration facility, and for fence-line commercial embodiment plants (CEP) operated at Dow Chemical or Dow Corning chemical plant locations (2) Research, development, and testing to define any technology gaps or critical design and integration issues (3) Engineering design and financing plan to install an integrated commercial demonstration facility at the existing Wabash River Energy Limited (WREL) plant in West Terre Haute, Indiana.

  18. Walla Walla River Basin Fish Habitat Enhancement Project, 2002-2003 Annual Report.

    SciTech Connect (OSTI)

    Volkman, Jed

    2005-12-01

    In 2002 and 2003, the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) Fisheries Habitat Program implemented stream habitat restoration and protection efforts on private properties in the Walla Walla River Basin with funding from Bonneville Power Administration (BPA). The objective of this effort is to protect and restore habitat critical to the recovery of weak or reintroduced populations of salmonid fish. The CTUIR has currently enrolled nine properties into this program: two on Couse Creek, two adjacent properties on Blue Creek, one on Patit Creek, and four properties on the mainstem Walla Walla River. Major accomplishments during the reporting period include the following: (1) Secured approximately $229,000 in project cost share; (2) Purchase of 46 acres on the mainstem Walla Walla River to be protected perpetually for native fish and wildlife; (3) Developed three new 15 year conservation easements with private landowners; (4) Installed 3000 feet of weed barrier tarp with new plantings within project area on the mainstem Walla Walla River; (5) Expanded easement area on Couse Creek to include an additional 0.5 miles of stream corridor and 32 acres of upland habitat; (6) Restored 12 acres on the mainstem Walla Walla River and 32 acres on Couse Creek to native perennial grasses; and (7) Installed 50,000+ new native plants/cuttings within project areas.

  19. Ecotoxicology | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Savannah River NERP Research Opportunities Field Sites / Data Research Facilities Low Dose Irradiation Facility Tritium Irrigation Facility Microsatellite Development Education Graduate Undergraduate Radioecology Curriculum Outreach Outreach Program SREL Herpetology Information for Visitors SREL Conference Center Maps and Directions Airports and Lodging Security Requirements Reprints Employment Make a Gift University of Georgia logo University of Georgia search SREL GO powered by Google

  20. Smith River Rancheria- 2005 Project

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Smith River Rancheria located just south of the Oregon border, on the coast, knows that developing a power-generation facility is a crucial part of its multifaceted plan for both economic development and reduction of energy costs. The activities associated with this grant will include the basic steps necessary to determine whether a generation facility will, in fact, benefit the tribe.

  1. The Savannah River Plant`s Groundwater Monitoring Program - second quarter 1987

    SciTech Connect (OSTI)

    1996-10-01

    This report is a summary of the groundwater monitoring program conducted by the Environmental Monitoring Group of the Health Protection Department in the second quarter of 1987 and includes the analytical results, field data, and detailed documentation for this program. The purpose of this report is twofold. First, the report provides a historical record of the activities and the rationale of the program; second, it provides an official document of the analytical results.

  2. HANFORD SITE RIVER CORRIDOR CLEANUP

    SciTech Connect (OSTI)

    BAZZELL, K.D.

    2006-02-01

    In 2005, the US Department of Energy (DOE) launched the third generation of closure contracts, including the River Corridor Closure (RCC) Contract at Hanford. Over the past decade, significant progress has been made on cleaning up the river shore that bordes Hanford. However, the most important cleanup challenges lie ahead. In March 2005, DOE awarded the Hanford River Corridor Closure Contract to Washington Closure Hanford (WCH), a limited liability company owned by Washington Group International, Bechtel National and CH2M HILL. It is a single-purpose company whose goal is to safely and efficiently accelerate cleanup in the 544 km{sup 2} Hanford river corridor and reduce or eliminate future obligations to DOE for maintaining long-term stewardship over the site. The RCC Contract is a cost-plus-incentive-fee closure contract, which incentivizes the contractor to reduce cost and accelerate the schedule. At $1.9 billion and seven years, WCH has accelerated cleaning up Hanford's river corridor significantly compared to the $3.2 billion and 10 years originally estimated by the US Army Corps of Engineers. Predictable funding is one of the key features of the new contract, with funding set by contract at $183 million in fiscal year (FY) 2006 and peaking at $387 million in FY2012. Another feature of the contract allows for Washington Closure to perform up to 40% of the value of the contract and subcontract the balance. One of the major challenges in the next few years will be to identify and qualify sufficient subcontractors to meet the goal.

  3. Mesaba next-generation IGCC plant

    SciTech Connect (OSTI)

    2006-01-01

    Through a US Department of Energy (DOE) cooperative agreement awarded in June 2006, MEP-I LLC plans to demonstrate a next generation integrated gasification-combined cycle (IGCC) electric power generating plant, the Mesaba Energy Project. The 606-MWe plant (the first of two similarly sized plants envisioned by project sponsors) will feature next-generation ConocoPhillips E-Gas{trademark} technology first tested on the DOE-funded Wabash River Coal Gasification Repowering project. Mesaba will benefit from recommendations of an industry panel applying the Value Improving Practices process to Wabash cost and performance results. The project will be twice the size of Wabash, while demonstrating better efficient, reliability and pollutant control. The $2.16 billion project ($36 million federal cost share) will be located in the Iron Range region north of Duluth, Minnesota. Mesaba is one of four projects selected under Round II of the Clean Coal Power Initiative. 1 fig.

  4. Process description and plant design for preparing ceramic high-level waste forms

    SciTech Connect (OSTI)

    Grantham, L.F.; McKisson, R.L.; Guon, J.; Flintoff, J.F.; McKenzie, D.E.

    1983-02-25

    The ceramics process flow diagram has been simplified and upgraded to utilize only two major processing steps - fluid-bed calcination and hot isostatic press consolidating. Full-scale fluid-bed calcination has been used at INEL to calcine high-level waste for 18 y; and a second-generation calciner, a fully remotely operated and maintained calciner that meets ALARA guidelines, started calcining high-level waste in 1982. Full-scale hot isostatic consolidation has been used by DOE and commercial enterprises to consolidate radioactive components and to encapsulate spent fuel elements for several years. With further development aimed at process integration and parametric optimization, the operating knowledge of full-scale demonstration of the key process steps should be rapidly adaptable to scale-up of the ceramic process to full plant size. Process flowsheets used to prepare ceramic and glass waste forms from defense and commercial high-level liquid waste are described. Preliminary layouts of process flow diagrams in a high-level processing canyon were prepared and used to estimate the preliminary cost of the plant to fabricate both waste forms. The estimated costs for using both options were compared for total waste management costs of SRP high-level liquid waste. Using our design, for both the ceramic and glass plant, capital and operating costs are essentially the same for both defense and commercial wastes, but total waste management costs are calculated to be significantly less for defense wastes using the ceramic option. It is concluded from this and other studies that the ceramic form may offer important advantages over glass in leach resistance, waste loading, density, and process flexibility. Preliminary economic calculations indicate that ceramics must be considered a leading candidate for the form to immobilize high-level wastes.

  5. Voluntary Protection Program Onsite Review, Savannah River Nuclear

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Solutions, Llc Savannah River Site - October 2014 | Department of Energy River Nuclear Solutions, Llc Savannah River Site - October 2014 Voluntary Protection Program Onsite Review, Savannah River Nuclear Solutions, Llc Savannah River Site - October 2014 October 2014 Recertification of SRNS as a Star Participant in the Department of Energy Voluntary Protection Program. This report summarizes the results from the evaluation of Savannah River Nuclear Solutions, LLC (SRNS), at the Savannah River

  6. Savannah River Laboratory Decontamination Program

    SciTech Connect (OSTI)

    Rankin, W.N.

    1991-01-01

    Savannah River Laboratory (SRL) has had a Decontamination and Decommissioning (D D) Technology program since 1981. The objective of this program is to provide state-of-the-art technology for use in D D operations that will enable our customers to minimize waste generated and personal exposure, increase productivity and safety, and to minimize the potential for release and uptake of radioactive material. The program identifies and evaluates existing technology, develops new technology, and provides technical assistance to implement its use onsite. This program has impacted not only the Savannah River Site (SRS), but the entire Department of Energy (DOE) complex. To document and communicate the technology generated by this program, 28 papers have been presented at National and International meetings in the United States and Foreign Countries.

  7. Savannah River Laboratory Decontamination Program

    SciTech Connect (OSTI)

    Rankin, W.N.

    1991-12-31

    Savannah River Laboratory (SRL) has had a Decontamination and Decommissioning (D&D) Technology program since 1981. The objective of this program is to provide state-of-the-art technology for use in D&D operations that will enable our customers to minimize waste generated and personal exposure, increase productivity and safety, and to minimize the potential for release and uptake of radioactive material. The program identifies and evaluates existing technology, develops new technology, and provides technical assistance to implement its use onsite. This program has impacted not only the Savannah River Site (SRS), but the entire Department of Energy (DOE) complex. To document and communicate the technology generated by this program, 28 papers have been presented at National and International meetings in the United States and Foreign Countries.

  8. about Savannah River National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tritium Effects on Materials In an effort to ensure the safety of the nation's nuclear weapons stockpile, the Savannah River National Laboratory (SRNL) maintains an active role in the research of tritium's impact on metal and the functionality of weapons systems. Not only does SRNL closely examine the material durability used in the construction of weapons, it examines performance quality in an effort to make certain the weapons stockpile is operating in a safe manner and at its best level. SRNL

  9. GASIFICATION PLANT COST AND PERFORMANCE OPTIMIZATION

    SciTech Connect (OSTI)

    Sheldon Kramer

    2003-09-01

    This project developed optimized designs and cost estimates for several coal and petroleum coke IGCC coproduction projects that produced hydrogen, industrial grade steam, and hydrocarbon liquid fuel precursors in addition to power. The as-built design and actual operating data from the DOE sponsored Wabash River Coal Gasification Repowering Project was the starting point for this study that was performed by Bechtel, Global Energy and Nexant under Department of Energy contract DE-AC26-99FT40342. First, the team developed a design for a grass-roots plant equivalent to the Wabash River Coal Gasification Repowering Project to provide a starting point and a detailed mid-year 2000 cost estimate based on the actual as-built plant design and subsequent modifications (Subtask 1.1). This non-optimized plant has a thermal efficiency to power of 38.3% (HHV) and a mid-year 2000 EPC cost of 1,681 $/kW.1 This design was enlarged and modified to become a Petroleum Coke IGCC Coproduction Plant (Subtask 1.2) that produces hydrogen, industrial grade steam, and fuel gas for an adjacent Gulf Coast petroleum refinery in addition to export power. A structured Value Improving Practices (VIP) approach was applied to reduce costs and improve performance. The base case (Subtask 1.3) Optimized Petroleum Coke IGCC Coproduction Plant increased the power output by 16% and reduced the plant cost by 23%. The study looked at several options for gasifier sparing to enhance availability. Subtask 1.9 produced a detailed report on this availability analyses study. The Subtask 1.3 Next Plant, which retains the preferred spare gasification train approach, only reduced the cost by about 21%, but it has the highest availability (94.6%) and produces power at 30 $/MW-hr (at a 12% ROI). Thus, such a coke-fueled IGCC coproduction plant could fill a near term niche market. In all cases, the emissions performance of these plants is superior to the Wabash River project. Subtasks 1.5A and B developed designs for

  10. Raft River geoscience case study

    SciTech Connect (OSTI)

    Dolenc, M.R.; Hull, L.C.; Mizell, S.A.; Russell, B.F.; Skiba, P.A.; Strawn, J.A.; Tullis, J.A.

    1981-11-01

    The Raft River Geothermal Site has been evaluated over the past eight years by the United States Geological Survey and the Idaho National Engineering Laboratory as a moderate-temperature geothermal resource. The geoscience data gathered in the drilling and testing of seven geothermal wells suggest that the Raft River thermal reservoir is: (a) produced from fractures found at the contact metamorphic zone, apparently the base of detached normal faulting from the Bridge and Horse Well Fault zones of the Jim Sage Mountains; (b) anisotropic, with the major axis of hydraulic conductivity coincident to the Bridge Fault Zone; (c) hydraulically connected to the shallow thermal fluid of the Crook and BLM wells based upon both geochemistry and pressure response; (d) controlled by a mixture of diluted meteoric water recharging from the northwest and a saline sodium chloride water entering from the southwest. Although the hydrogeologic environment of the Raft River geothermal area is very complex and unique, it is typical of many Basin and Range systems.

  11. Office of River Protection Mission Completion Strategy

    SciTech Connect (OSTI)

    Wiegman, S. A.; Hewitt, W. M.; Yuracko, K.; Holbrook, J. H.

    2002-02-26

    DOE's Office of River Protection (ORP) is readying itself to commence construction of a Waste Treatment Plant (WTP) that will start the process of turning Hanford tank waste into glass. The plant is state-of-the art and includes reasonable flexibility to improve operations as technology and operational understandings improve. During its 40 year design life the plant has the capability to treat half of the total volume of tank waste and reduce risk to the public by up to ninety percent. Looking beyond initial processing towards the project end state, however, it is apparent that ORP's baseline approach is part of the issue raised by the DOE Secretary when he said that $300 billion and 75 years is too costly and too long for DOE's environmental cleanups. ORP has reviewed its cost and schedule drivers and has started identifying areas where better technologies and risk-based strategies could substantially decrease its life cycle cost and schedule. Specific technologies under consideration will be discussed along with expected return on investment. ORP is totally committed to taking all steps necessary during cleanup to protect human health and the environment and to comply with appropriate regulations and commitments. But, ORP is also very conscious of the fact that the history of Hanford production and tank farm operations has resulted in very large tank-to-tank variabilities in the waste constituents. Not all tank wastes demand the same high level of rigor in treatment as provided by the WTP in order to protect people and the environment. Parallel treatment paths, keyed to the hazards and chemical challenges each tank presents, need to be developed. The WTP vitrification capabilities should be deployed for the higher risk wastes that require vitrification. By getting wastes in the proper paths for treatment based upon their chemical characteristics and inherent risks, ORP will be able to both accelerate the cleanup schedule and bring its life cycle and annual

  12. Bonneville Project Act, Federal Columbia River Transmission System Act and Other Related Legislation.

    SciTech Connect (OSTI)

    Not Available

    1985-01-01

    Legislative texts are provided for: Bonneville Project Act which authorizes the completion, maintenance, and operation of Bonneville project for navigation, and for other purposes; Federal Columbia River Transmission system Act which enables the Secretary of the Interior to provide for operation, maintenance, and continued construction of the Federal transmission system in the Pacific Northwest by use of the revenues of the Federal Columbia River Power System and the proceeds of revenue bonds, and for other purposes; public law 88--552 which guarantees electric consumers of the Pacific Northwest first call on electric energy generated at Federal hydroelectric plants in that regions and reciprocal priority, and for other purposes; and public law 78--329 which provides for the partial construction of the Hungary Horse Dam on the South Fork of the Flathead River in the state of Montana, and for other purposes

  13. The Columbia River System : the Inside Story.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1991-09-01

    The Columbia Ricer is one of the greatest natural resources in the western United States. The river and its tributaries touch the lives of nearly every resident of the Northwest-from providing the world-famous Pacific salmon to supplying the clean natural fuel for over 75 percent of the region's electrical generation. Since early in the century, public and private agencies have labored to capture the benefits of this dynamic river. Today, dozens of major water resource projects throughout the region are fed by the waters of the Columbia Basin river system. And through cooperative efforts, the floods that periodically threaten developments near the river can be controlled. This publication presents a detailed explanation of the planning and operation of the multiple-use dams and reservoirs of the Columbia River system. It describes the river system, those who operate and use it, the agreements and policies that guide system operation, and annual planning for multiple-use operation.

  14. Flambeau_River_Biofuels.pdf | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Flambeau_River_Biofuels.pdf Flambeau_River_Biofuels.pdf Flambeau_River_Biofuels.pdf Flambeau_River_Biofuels.pdf (26 KB) More Documents & Publications Pacific Ethanol, Inc Flambeau River Biofuels Demonstration-Scale Biorefinery NewPage Demonstration-Scale Biorefinery

  15. U. S. Department of Energy Savannah River Operations Office - Tenant

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Organizations Organizations Tenant Organizations Federal Offices National Nuclear Security Administration External Link Office of Environmental Management External Link U. S. Forest Service - Savannah River External Link Contractor Organizations Savannah River Nuclear Solutions External Link Savannah River National Laboratory External Link Savannah River Remediation External Link Centerra University of Georgia - Savannah River Ecology Laboratory External Link Shaw AREVA MOX Services External

  16. Three Rivers Builders The Three Rivers House 2015 Race to Zero Student Design Competition

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    i Three Rivers Builders The Three Rivers House 2015 Race to Zero Student Design Competition ii TABLE OF CONTENTS 1 Team Qualifications .............................................................................................................................. 1 1.1 Our Team ...................................................................................................................................... 1 1.2 Qualifications

  17. Deep drilling data, Raft River geothermal area, Idaho-Raft River...

    Open Energy Info (EERE)

    data, Raft River geothermal area, Idaho-Raft River geothermal exploration well sidetrack-C Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Deep drilling...

  18. Savannah River Site Vegetation Map | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Set-Aside Program SREL HOME Savannah River Site Vegetation Map swatch 1. Industrial swatch 2. Open water swatch 3. Bare soil / bare surface swatch 4. Sparse herbaceous vegetation swatch 5. Grasses and forbs swatch 6. Shrubs, grasses, and forbs swatch 7. Disturbed and revegetated in 1997 swatch 8. Marsh / aquatic macrophytes swatch 9. Young, open-canopy loblolly pine swatch 10. Open-canopy loblolly pine swatch 11. Young, dense-canopy loblolly pine swatch 12. Dense-canopy loblolly pine swatch 13.

  19. Total dissolved gas prediction and optimization in RiverWare

    SciTech Connect (OSTI)

    Stewart, Kevin M.; Witt, Adam M.; Hadjerioua, Boualem

    2015-09-01

    Management and operation of dams within the Columbia River Basin (CRB) provides the region with irrigation, hydropower production, flood control, navigation, and fish passage. These various system-wide demands can require unique dam operations that may result in both voluntary and involuntary spill, thereby increasing tailrace levels of total dissolved gas (TDG) which can be fatal to fish. Appropriately managing TDG levels within the context of the systematic demands requires a predictive framework robust enough to capture the operationally related effects on TDG levels. Development of the TDG predictive methodology herein attempts to capture the different modes of hydro operation, thereby making it a viable tool to be used in conjunction with a real-time scheduling model such as RiverWare. The end result of the effort will allow hydro operators to minimize system-wide TDG while meeting hydropower operational targets and constraints. The physical parameters such as spill and hydropower flow proportions, accompanied by the characteristics of the dam such as plant head levels and tailrace depths, are used to develop the empirically-based prediction model. In the broader study, two different models are developed a simplified and comprehensive model. The latter model incorporates more specific bubble physics parameters for the prediction of tailrace TDG levels. The former model is presented herein and utilizes an empirically based approach to predict downstream TDG levels based on local saturation depth, spillway and powerhouse flow proportions, and entrainment effects. Representative data collected from each of the hydro projects is used to calibrate and validate model performance and the accuracy of predicted TDG uptake. ORNL, in conjunction with IIHR - Hydroscience & Engineering, The University of Iowa, carried out model adjustments to adequately capture TDG levels with respect to each plant while maintaining a generalized model configuration. Validation results

  20. Washington River Protection Solutions - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Protection Solutions, LLC logo The operation of maintaining the underground waste storage tanks at Hanford falls under the jurisdiction of Washington River Protection...

  1. Preliminary Notice of Violation, Westinghouse Savannah River...

    Office of Environmental Management (EM)

    concerning the unnecessary radiation exposure of three Westinghouse Savannah River Company (WSRC) personnel and the subsequent falsification of radiation dose records. ...

  2. Enforcement Letter, Westinghouse Savannah River Company - November...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Company related to repeated criticality safety violations in 2002 and 2003 at the H-Canyon facility at DOE's Savannah River Site. PDF icon Enforcement Letter, Westinghouse...

  3. The Columbia River System Inside Story

    SciTech Connect (OSTI)

    2001-04-01

    The Columbia River is one of the greatest natural resources in the western United States. The river and its tributaries touch the lives of nearly every resident of the Pacific Northwest—from fostering world-famous Pacific salmon to supplying clean natural fuel for 50 to 65 percent of the region’s electrical generation. Since early in the 20th century, public and private agencies have labored to capture the benefits of this dynamic river. Today, dozens of major water resource projects throughout the region are fed by the waters of the Columbia Basin river system.

  4. New Columbia River Estuary purchases benefit salmon

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the mouth of the Columbia River to permanently protect riverside habitat for Northwest fish and wildlife, including threatened and endangered salmon and steelhead. The...

  5. Brochure: Federal Columbia River Power System (FCRPS)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    these agencies maximize the use of the Columbia River by generating power, protecting fish and wildlife, controlling floods, providing irrigation and navigation, and sustaining...

  6. Savannah River Laboratory monthly report, October 1991

    SciTech Connect (OSTI)

    Ferrell, J.M.

    1991-01-01

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation, tritium facilities and production; separations operations; environmental concerns; and waste management. (FI)

  7. Big Rivers Electric Corp | Open Energy Information

    Open Energy Info (EERE)

    (270) 827-2561 Website: www.bigrivers.com Facebook: https:www.facebook.compagesBig-Rivers-Electric-Corporation142180855818082?rf154289971250771 Outage Hotline: (270)...

  8. Lumbee River EMC- Residential Energy Efficiency Program

    Broader source: Energy.gov [DOE]

    Lumbee River EMC (LREMC) offers rebates to its residential customers who purchase and install qualified energy efficient products or services. Rebates are available for:

  9. Big River Resources LLC | Open Energy Information

    Open Energy Info (EERE)

    Resources LLC Jump to: navigation, search Name: Big River Resources LLC Place: West Burlington, Iowa Zip: 52655 Product: Dry-mill bioethanol producer with a cooperative structure....

  10. Cuivre River Electric- Energy Efficiency Rebate Programs

    Broader source: Energy.gov [DOE]

    Cuivre River Electric Cooperative, through the Take Control & Save program, offers rebates for cooperative members who purchase efficient geothermal and dual fuel heat pumps, and electric water...

  11. River Valley Technology Center | Open Energy Information

    Open Energy Info (EERE)

    Valley Technology Center Jump to: navigation, search Name: River Valley Technology Center Place: United States Sector: Services Product: General Financial & Legal Services (...

  12. Two Rivers Water & Light | Open Energy Information

    Open Energy Info (EERE)

    Water & Light Jump to: navigation, search Name: Two Rivers Water & Light Place: Wisconsin Phone Number: (920) 793-5550 Website: trwaterandlight.com Facebook: https:...

  13. Savannah River Laboratory monthly report, October 1991

    SciTech Connect (OSTI)

    Ferrell, J.M.

    1991-12-31

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation, tritium facilities and production; separations operations; environmental concerns; and waste management. (FI)

  14. Savannah River Laboratory monthly report, November 1991

    SciTech Connect (OSTI)

    Ferrell, J.M.

    1991-12-31

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation; tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

  15. Savannah River Laboratory monthly report, November 1991

    SciTech Connect (OSTI)

    Ferrell, J.M.

    1991-01-01

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation; tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

  16. Savannah River Laboratory monthly report, September 1991

    SciTech Connect (OSTI)

    Ferrell, J.M.

    1991-01-01

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation, tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

  17. Savannah River Laboratory monthly report, September 1991

    SciTech Connect (OSTI)

    Ferrell, J.M.

    1991-12-31

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation, tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

  18. Savannah River Laboratory monthly report, July 1991

    SciTech Connect (OSTI)

    Ferrell, J.M.

    1991-01-01

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation; tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

  19. Savannah River Laboratory monthly report, July 1991

    SciTech Connect (OSTI)

    Ferrell, J.M.

    1991-12-31

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation; tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

  20. Savannah River Laboratory monthly report, August 1991

    SciTech Connect (OSTI)

    Ferrell, J.M.

    1991-12-31

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation, tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

  1. Savannah River Laboratory monthly report, August 1991

    SciTech Connect (OSTI)

    Ferrell, J.M.

    1991-01-01

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation, tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

  2. Savannah River Needs Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This Needs Assessment for former Savannah River Site construction workers was developed for the purpose of collecting existing information relevant to exposure and health outcomes ...

  3. Power of the River History Book

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Power-of-the-River-BPA-History-Book Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects &...

  4. Preliminary Notice of Violation, Westinghouse Savannah River...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Achievable (ALARA) deficiencies that contributed to unplanned worker uptakes and the spread of contamination at DOE's Savannah River Site. PDF icon Preliminary Notice of...

  5. Brazos River Authority | Open Energy Information

    Open Energy Info (EERE)

    Place: Texas Phone Number: 1-888-922-6272 Website: www.brazos.org Facebook: https:www.facebook.compagesBrazos-River-Authority126719790675809?frefts Outage Hotline:...

  6. Independent Oversight Review, Savannah River Operations Office...

    Office of Environmental Management (EM)

    - July 2013 July 2013 Review of the Employee Concerns Program at the Savannah River ... O 442.1, DEPARTMENT OF ENERGY EMPLOYEE CONCERNS PROGRAM Independent Activity ...

  7. Gila River Indian Community- 2012 Project

    Broader source: Energy.gov [DOE]

    The Gila River Indian Community (GRIC) will conduct feasibility studies of potential renewable energy projects on its lands in south central Arizona.

  8. Beijing Changjiang River International Holding | Open Energy...

    Open Energy Info (EERE)

    100761 Sector: Services Product: Beijing Changjiang River International Holding is a Chinese emissions broker and services company. Coordinates: 39.90601, 116.387909 Show Map...

  9. Lower Colorado River Authority | Open Energy Information

    Open Energy Info (EERE)

    Name: Lower Colorado River Authority Place: Texas Website: www.lcra.orgPagesdefault.asp Twitter: @lcra Facebook: https:www.facebook.comlowercoloradoriverauthority Outage...

  10. PIA - Savannah River Remediation Accreditation Boundary (SRR...

    Energy Savers [EERE]

    PIA - Savannah River Nuclear Solution IBARS Srs Site Apps. Accreditation Boundary PIA - WEB Physical Security Major Application Occupational Medical Surveillance System (OMSS) PIA, ...

  11. Analysis of Waste Isolation Pilot Plant Samples: Integrated Summary Report

    SciTech Connect (OSTI)

    Britt, Phillip F

    2015-03-01

    Analysis of Waste Isolation Pilot Plant Samples: Integrated Summary Report. Summaries of conclusions, analytical processes, and analytical results. Analysis of samples taken from the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico in support of the WIPP Technical Assessment Team (TAT) activities to determine to the extent feasible the mechanisms and chemical reactions that may have resulted in the breach of at least one waste drum and release of waste material in WIPP Panel 7 Room 7 on February 14, 2014. This report integrates and summarizes the results contained in three separate reports, described below, and draws conclusions based on those results. Chemical and Radiochemical Analyses of WIPP Samples R-15 C5 SWB and R16 C-4 Lip; PNNL-24003, Pacific Northwest National Laboratory, December 2014 Analysis of Waste Isolation Pilot Plant (WIPP) Underground and MgO Samples by the Savannah River National Laboratory (SRNL); SRNL-STI-2014-00617; Savannah River National Laboratory, December 2014 Report for WIPP UG Sample #3, R15C5 (9/3/14); LLNL-TR-667015; Lawrence Livermore National Laboratory, January 2015 This report is also contained in the Waste Isolation Pilot Plant Technical Assessment Team Report; SRNL-RP-2015-01198; Savannah River National Laboratory, March 17, 2015, as Appendix C: Analysis Integrated Summary Report.

  12. Plant-based Materials

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plant-based Materials Catalysis Center for Energy Innovation teams with consumer goods and ... announced a research program with the Plant PET Technology Collaborative (PTC) to ...

  13. Umatilla River Basin Anadromous Fsh Habitat Enhancement Project : 2000 Annual Report.

    SciTech Connect (OSTI)

    Shaw, R. Todd

    2001-12-31

    The Umatilla River Basin Anadromous Fish Habitat Enhancement Project continued to identify impacted stream reaches throughout the Umatilla River Basin for habitat improvements during the 2000 project period. Public outreach efforts, biological and physical monitoring, and continued development of a Umatilla River Basin Watershed Assessment assisted the project in fostering public cooperation, targeting habitat deficiencies and determining habitat recovery measures. Habitat enhancement projects continued to be maintained on 44 private properties, four riparian easements and one in-stream enhancement agreement were secured, two new projects implemented and two existing projects improved to enhance anadromous fish habitat and natural fisheries production capabilities in the Umatilla River Basin. New project locations included sites on the mid Umatilla River and Buckaroo Creek. Improvements were implemented at existing project sites on the upper Umatilla River and Wildhorse Creek. A stream bank stabilization project was implemented at approximately River Mile 37.4 Umatilla River to stabilize 760 feet of eroding stream bank and improve in-stream habitat diversity. Habitat enhancements at this site included construction of six rock barbs with one large conifer root wad incorporated into each barb, stinging approximately 10,000 native willow cuttings, planting 195 tubling willows and 1,800 basin wildrye grass plugs, and seeding 40 pounds of native grass seed. Staff time to assist in development of a subcontract and fence materials were provided to establish eight spring sites for off-stream watering and to protect wetlands within the Buckaroo Creek Watershed. A gravel bar was moved and incorporated into an adjacent point bar to reduce stream energy and stream channel confinement within the existing project area at River Mile 85 Umatilla River. Approximately 10,000 native willow cuttings were stung and trenched into the stream channel margins and stream banks, and 360

  14. Hood River Passive House, Hood River, Oregon (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2014-02-01

    The Hood River Passive Project was developed by Root Design Build of Hood River Oregon using the Passive House Planning Package (PHPP) to meet all of the requirements for certification under the European Passive House standards. The Passive House design approach has been gaining momentum among residential designers for custom homes and BEopt modeling indicates that these designs may actually exceed the goal of the U.S. Department of Energy's (DOE) Building America program to "reduce home energy use by 30%-50%" (compared to 2009 energy codes for new homes). This report documents the short term test results of the Shift House and compares the results of PHPP and BEopt modeling of the project. The design includes high R-Value assemblies, extremely tight construction, high performance doors and windows, solar thermal DHW, heat recovery ventilation, moveable external shutters and a high performance ductless mini-split heat pump. Cost analysis indicates that many of the measures implemented in this project did not meet the BA standard for cost neutrality. The ductless mini-split heat pump, lighting and advanced air leakage control were the most cost effective measures. The future challenge will be to value engineer the performance levels indicated here in modeling using production based practices at a significantly lower cost.

  15. U.S. Department of Energy electric and hybrid vehicle Site Operator Program at Platte River Power Authority. Final report, July 3, 1991--August 31, 1996

    SciTech Connect (OSTI)

    Emmert, R.A.

    1996-12-31

    The Platte River Power Authority (Platte River) is a political subdivision of the state of Colorado, owned by the four municipalities of Fort Collins, Loveland, Longmont and Estes Park, Colorado. Platte River is a non-profit, publicly owned, joint-action agency formed to construct, operate and maintain generating plants, transmission systems and related facilities for the purpose of delivering to the four municipalities electric energy for distribution and resale. Platte River, as a participant in the US Department of Energy (DOE) Site Operator Program, worked to accomplish the Site Operator Program goals and objectives to field test and evaluate electric and electric-hybrid vehicles and electric vehicle systems in a real world application/environment. This report presents results of Platte River`s program (Program) during the five-years Platte River participated in the DOE Site Operator Program. Platte River participated in DOE Site Operator Program from July 3, 1991 through August 31, 1996. During its Program, Platte River conducted vehicle tests and evaluations, and electric vehicle demonstrations in the Front Range region of Northern Colorado. Platte River also investigated electric vehicle infrastructure issues and tested infrastructure components. Platte River`s Program objectives were as follows: evaluate the year round performance, operational costs, reliability, and life cycle costs of electric vehicles in the Front Range region of Northern Colorado; evaluate an electric vehicle`s usability and acceptability as a pool vehicle; test any design improvements or technological improvements on a component level that may be made available to PRPA and which can be retrofit into vehicles; and develop, test and evaluate, and demonstrate components to be used in charging electric vehicles.

  16. River Turbine Provides Clean Energy to Remote Alaskan Village...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    River Turbine Provides Clean Energy to Remote Alaskan Village River Turbine Provides Clean Energy to Remote Alaskan Village August 18, 2015 - 10:36am Addthis River Turbine Provides ...

  17. EA-273-A Rainy River Energy Corporation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    -A Rainy River Energy Corporation EA-273-A Rainy River Energy Corporation Order authorizing Rainy River Energy Corporation to export electric energy to Canada. PDF icon EA-273-A ...

  18. Energy-water challenge emerges in Colorado River flows

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy-water challenge emerges in Colorado River flows Energy-water challenge emerges in Colorado River flows Climate-driven heat-stress and forest mortality on the Colorado River ...

  19. Wild and Scenic Rivers Act (1968) | Department of Energy

    Office of Environmental Management (EM)

    Wild and Scenic Rivers Act (1968) The National Wild and Scenic Rivers System was created by Congress in 1968 (Public Law 90-542; 16 U.S.C. 1271 et seq.) to preserve certain rivers ...

  20. Louisiana Nuclear Profile - River Bend

    U.S. Energy Information Administration (EIA) Indexed Site

    River Bend" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date" 1,974,"8,363",98.0,"BWR","application/vnd.ms-excel","application/vnd.ms-excel" ,974,"8,363",98.0 "Data for 2010" "BWR = Boiling

  1. Florida Nuclear Profile - Crystal River

    U.S. Energy Information Administration (EIA) Indexed Site

    Crystal River1" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date" 3,860,0,"--","PWR","application/vnd.ms-excel","application/vnd.ms-excel" ,860,0,"--" "Data for 2010" "1 Unit was offline in 2010 for repairs." "-- Not applicable.

  2. Smith River Rancheria- 2003 Project

    Broader source: Energy.gov [DOE]

    Implement a planning effort that addresses current and future energy needs and results in a long-term sustainable plan for energy self-sufficiency on the Rancheria. The Smith River Rancheria, located in northern Del Norte County, California about four miles south of the Oregon border on the Pacific Ocean, composes 184.4 acres. This effort is intended to promote energy self-sufficiency and assist in meeting the tribe's goal to preserve and protect the aboriginal territory of the Tolowa People.

  3. AmeriFlux US-ORv Olentangy River Wetland Research Park

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Bohrer, Gil [The Ohio State University

    2016-01-01

    This is the AmeriFlux version of the carbon flux data for the site US-ORv Olentangy River Wetland Research Park. Site Description - The ORWRP site is a 21-ha large-scale, long-term wetland campus facility that is owned by Ohio State University. It is designed to provide teaching, research, and service related to wetland and river science and ecological engineering. The site has been developed in several phases: Phase 1 (1992 - 1994) - Construction of two 2.5-acre deepwater marshes and a river water delivery system began, with pumps installed on the floodplain to bring water from the Olentangy River. In May 1994, one wetland was planted with marsh vegetation, while the other remained as an unplanted control; Phase 2 (1994 - 1999) - Development of a research and teaching infrastructure took place with the construction of boardwalks, a pavilion, and a compound. The creation of the 7-acre naturally flooded oxbow was also included; Phase 3 (2000 - 2003) - As a research building was created, three additional wetlands were created in the vicinity of the building, including a stormwater wetland that receives runoff from the roof of the building; Phase 4 - The current phase involves research access to the Olentangy River.

  4. Malheur River Wildlife Mitigation Project, Annual Report 2003.

    SciTech Connect (OSTI)

    Ashley, Paul

    2004-01-01

    Hydropower development within the Columbia and Snake River Basins has significantly affected riparian, riverine, and adjacent upland habitats and the fish and wildlife species dependent upon them. Hydroelectric dams played a major role in the extinction or major loss of both anadromous and resident salmonid populations and altered instream and adjacent upland habitats, water quality, and riparian/riverine function. Hydroelectric facility construction and inundation directly affected fish and wildlife species and habitats. Secondary and tertiary impacts including road construction, urban development, irrigation, and conversion of native habitats to agriculture, due in part to the availability of irrigation water, continue to affect wildlife and fish populations throughout the Columbia and Snake River Basins. Fluctuating water levels resulting from facility operations have created exposed sand, cobble, and/or rock zones. These zones are generally devoid of vegetation with little opportunity to re-establish riparian plant communities. To address the habitat and wildlife losses, the United States Congress in 1980 passed the Pacific Northwest Electric Power Planning and Conservation Act (Act) (P.L. 96-501), which authorized the states of Idaho, Montana, Oregon, and Washington to create the Northwest Power Planning Council (Council). The Act directed the Council to prepare a program in conjunction with federal, state, and tribal wildlife resource authorities to protect, mitigate, and enhance fish and wildlife species affected by the construction, inundation and operation of hydroelectric dams in the Columbia River Basin (NPPC 2000). Under the Columbia Basin Fish and Wildlife Program (Program), the region's fish and wildlife agencies, tribes, non-government organizations (NGOs), and the public propose fish and wildlife projects that address wildlife and fish losses resulting from dam construction and subsequent inundation. As directed by the Council, project proposals are

  5. Comments of the Lower Colorado River Authority | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lower Colorado River Authority Comments of the Lower Colorado River Authority Comments of the Lower Colorado River Authority on Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy Comments of the Lower Colorado River Authority (54.12 KB) More Documents & Publications Lower Colorado River Authority Lower Colorado River Authority NBP RFI: Communications Requirements- Comments of Meeker Cooperative Light

  6. EA-1692: Red River Environmental Products, LLC Activated Carbon

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Manufacturing Facility, Red River Parish, LA | Department of Energy 2: Red River Environmental Products, LLC Activated Carbon Manufacturing Facility, Red River Parish, LA EA-1692: Red River Environmental Products, LLC Activated Carbon Manufacturing Facility, Red River Parish, LA June 1, 2010 EA-1692: Final Environmental Assessment Construction and Start-Up of an Activated Carbon Manufacturing Facility in Red River Parish, Louisiana June 11, 2010 EA-1692: Finding of No Significant Impact Red

  7. Voluntary Protection Program Onsite Review, Savannah River Remediation,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Llc, Liquid Waste Contract, Savannah River Site - November 2014 | Department of Energy River Remediation, Llc, Liquid Waste Contract, Savannah River Site - November 2014 Voluntary Protection Program Onsite Review, Savannah River Remediation, Llc, Liquid Waste Contract, Savannah River Site - November 2014 November 2014 Recertification of SRR as a Star Participant in the Department of Energy Voluntary Protection Program. This report summarizes the results from the evaluation of Savannah River

  8. The Savannah River Site`s Groundwater Monitoring Program. Second quarter 1994

    SciTech Connect (OSTI)

    Not Available

    1994-11-01

    This document contains information concerning the groundwater monitoring program at Savannah River Plant. The EPD/EMS (environmental protection department/environmental monitoring section) is responsible for monitoring constituents in the groundwater at approximately 135 waste sites in 16 areas at SRS. This report consolidates information from field reports, laboratory analysis, and quality control. The groundwater in these areas has been contaminated with radioactive materials, organic compounds, and heavy metals.

  9. Waste management units - Savannah River Site. Volume 1, Waste management unit worksheets

    SciTech Connect (OSTI)

    Not Available

    1989-10-01

    This report is a compilation of worksheets from the waste management units of Savannah River Plant. Information is presented on the following: Solid Waste Management Units having received hazardous waste or hazardous constituents with a known release to the environment; Solid Waste Management Units having received hazardous waste or hazardous constituents with no known release to the environment; Solid Waste Management Units having received no hazardous waste or hazardous constituents; Waste Management Units having received source; and special nuclear, or byproduct material only.

  10. Lesson Learned by Savannah River Site Activity-level Work Planning and Control

    Broader source: Energy.gov [DOE]

    Slide Presentation by Bonnie Barnes, Savannah River Remediation. Work Planning and Control at Savannah River Remediation.

  11. Voluntary Protection Program Onsite Review, Savannah River Nuclear...

    Broader source: Energy.gov (indexed) [DOE]

    Department of Energy Voluntary Protection Program. This report summarizes the results from the evaluation of Savannah River Nuclear Solutions, LLC (SRNS), at the Savannah River ...

  12. Lichuan City Yujiang River Valley Hydro Co Ltd | Open Energy...

    Open Energy Info (EERE)

    Lichuan City Yujiang River Valley Hydro Co Ltd Jump to: navigation, search Name: Lichuan City Yujiang River Valley Hydro Co., Ltd. Place: Hubei Province, China Zip: 445400 Sector:...

  13. COMPARISON OF THREE TRACER TESTS AT THE RAFT RIVER GEOTHERMAL...

    Office of Scientific and Technical Information (OSTI)

    TESTS AT THE RAFT RIVER GEOTHERMAL SITE Citation Details In-Document Search Title: COMPARISON OF THREE TRACER TESTS AT THE RAFT RIVER GEOTHERMAL SITE Three conservative ...

  14. Interagency Wild and Scenic Rivers Coordinating Council's WSRA...

    Open Energy Info (EERE)

    to use the flowcharts created by the Interagency Wild and Scenic Rivers Coordinating Council. Author The Interagency Wild and Scenic Rivers Coordinating Council Published The...

  15. PIA - Savannah River Operations Office Executive Commitment Action...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Operations Office Executive Commitment Action Tracking System PIA - Savannah River Operations Office Executive Commitment Action Tracking System PIA - Savannah River Operations ...

  16. Tongue River Electric Coop Inc | Open Energy Information

    Open Energy Info (EERE)

    Tongue River Electric Coop Inc Jump to: navigation, search Name: Tongue River Electric Coop Inc Place: Montana Phone Number: 406-784-2341 Website: tongueriverelectric.com...

  17. Exhibit D: Mirant Potomac River Schedule of Operations: January...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications Exhibit D: Mirant Potomac River Schedule of Unit Operations: January - March 2006 Exhibit D: Mirant Potomac River Schedule of Unit Operations: ...

  18. CRAD, Emergency Management - Office of River Protection K Basin...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Emergency Management - Office of River Protection K Basin Sludge Waste System CRAD, Emergency Management - Office of River Protection K Basin Sludge Waste System May 2004 A section ...

  19. 2012 Annual Planning Summary for Savannah River Operations Office...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Savannah River Operations Office 2012 Annual Planning Summary for Savannah River Operations Office The ongoing and projected Environmental Assessments and Environmental Impact ...

  20. Ventilation System to Improve Savannah River Site's Liquid Waste...

    Office of Environmental Management (EM)

    Ventilation System to Improve Savannah River Site's Liquid Waste Operations Ventilation System to Improve Savannah River Site's Liquid Waste Operations August 28, 2014 - 12:00pm ...

  1. PIA - Savannah River Operations Office Lotus Domino/Notes System...

    Broader source: Energy.gov (indexed) [DOE]

    Lotus DominoNotes System PDF icon PIA - Savannah River Operations Office Lotus DominoNotes System More Documents & Publications PIA - DOE Savannah River Operations Office PRISM ...

  2. FY 2012 Savannah River Nuclear Solutions, LLC, PER Summary |...

    National Nuclear Security Administration (NNSA)

    12 Savannah River Nuclear Solutions, LLC, PER Summary SUMMARY OF FY 2012 SAVANNAH RIVER NUCLEAR SOLUTIONS, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  3. Savannah River Site Salt Waste Processing Facility Technology...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Savannah River Site Salt Waste Processing Facility Technology Readiness Assessment Report Full Document and Summary Versions are available for download PDF icon Savannah River Site ...

  4. FY 2010 Savannah River Nuclear Solutions, LLC, PER Summary |...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0 Savannah River Nuclear Solutions, LLC, PER Summary SUMMARY OF FY 2010 SAVANNAH RIVER NUCLEAR SOLUTIONS, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  5. PIA - Savannah River Site Management and Operating Contractor...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Site Management and Operating Contractor (HRMS) PIA - Savannah River Site Management and Operating Contractor (HRMS) PIA - Savannah River Site Management and Operating Contractor ...

  6. FY 2008 Washington Savannah River Company, LLC, PER Summary ...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 Washington Savannah River Company, LLC, PER Summary SUMMARY OF FY 2008 WASHINGTON SAVANNAH RIVER COMPANY, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  7. Passive Groundwater Cleanup Measures Save Savannah River Site...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Passive Groundwater Cleanup Measures Save Savannah River Site Millions of Dollars Passive Groundwater Cleanup Measures Save Savannah River Site Millions of Dollars November 25, ...

  8. U. S. Department of Energy Savannah River Operations Office ...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Small Business Forum Technology Demos & opportunities The Department of Energy Office of Environmental Management, Savannah River Site and the Savannah River National Laboratory ...

  9. Savannah River Site - Salt Waste Processing Facility Independent...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Savannah River Site - Salt Waste Processing Facility Independent Technical Review Full Document and Summary Versions are available for download PDF icon Savannah River Site - Salt ...

  10. FY 2006 Washington Savannah River Company, LLC, PER Summary ...

    National Nuclear Security Administration (NNSA)

    6 Washington Savannah River Company, LLC, PER Summary SUMMARY OF FY 2006 WASHINGTON SAVANNAH RIVER COMPANY, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  11. Enterprise Assessments Review, Savannah River Site 2014 Site...

    Energy Savers [EERE]

    Savannah River Site 2014 Site-Level Exercise - January 2015 Enterprise Assessments Review, Savannah River Site 2014 Site-Level Exercise - January 2015 January 2015 Review of the ...

  12. Disposal Practices at the Savannah River Site | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Practices at the Savannah River Site Disposal Practices at the Savannah River Site Full Document and Summary Versions are available for download PDF icon Disposal Practices at the ...

  13. Dennis Yates Of Savannah River Operations Named 2013 Facility...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Dennis Yates Of Savannah River Operations Named 2013 Facility Representative Of The Year Dennis Yates Of Savannah River Operations Named 2013 Facility Representative Of The Year ...

  14. 2013 Annual Planning Summary for the Savannah River Operations...

    Broader source: Energy.gov (indexed) [DOE]

    Savannah River Operations Office. PDF icon NNSASROONEPA-APS-2013.pdf More Documents & Publications 2012 Annual Planning Summary for Savannah River Operations Office 2010 Annual ...

  15. Construction Workers Achieve Safety Milestone at Savannah River...

    Office of Environmental Management (EM)

    Construction Workers Achieve Safety Milestone at Savannah River Site Construction Workers Achieve Safety Milestone at Savannah River Site April 29, 2014 - 4:23pm Addthis Savannah ...

  16. Microsoft PowerPoint - Allison - Savannah River Presentation

    Office of Environmental Management (EM)

    September 30, 2009 September 30, 2009 JEFFREY M. ALLISON, MANAGER JEFFREY M. ALLISON, MANAGER Savannah River Operations Office Savannah River Operations Office The State of ...

  17. Savannah River Site Federal Facility Agreement, January 15, 1993...

    Office of Environmental Management (EM)

    Site Agreement Name Savannah River Site Federal Facility Agreement Under Section 120 of ... with past and present activities at the Savannah River Site are thoroughly investigated ...

  18. DOE Order 435.1 Performance Assessment Savannah River Site |...

    Energy Savers [EERE]

    Order 435.1 Performance Assessment Savannah River Site DOE Order 435.1 Performance Assessment Savannah River Site Performance Assessments (PA) are analyses conducted for low level ...

  19. Employee of Savannah River Site Contractor Recognized as Exemplary...

    Office of Environmental Management (EM)

    Employee of Savannah River Site Contractor Recognized as Exemplary in Safety and Health Employee of Savannah River Site Contractor Recognized as Exemplary in Safety and Health ...

  20. Vermont Watershed Management Rivers Program Website | Open Energy...

    Open Energy Info (EERE)

    Vermont Watershed Management Rivers Program Website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Vermont Watershed Management Rivers Program Website...

  1. ITP LEADER Case Study: Flambeau River Papers Makes a Comeback...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    LEADER Case Study: Flambeau River Papers Makes a Comeback With a Revised Energy Strategy ITP LEADER Case Study: Flambeau River Papers Makes a Comeback With a Revised Energy ...

  2. Ground Gravity Survey At Snake River Plain Region (DOE GTP) ...

    Open Energy Info (EERE)

    Ground Gravity Survey At Snake River Plain Region (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity Survey At Snake River...

  3. Yingjiang County Binglang River Hydroelectric Power Co Ltd |...

    Open Energy Info (EERE)

    Yingjiang County Binglang River Hydroelectric Power Co Ltd Jump to: navigation, search Name: Yingjiang County Binglang River Hydroelectric Power Co., Ltd. Place: Dehong Dai-Jingpo...

  4. Red River Hot Springs Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    Red River Hot Springs Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Red River Hot Springs Geothermal Area Contents 1 Area Overview 2 History and...

  5. Red River Hot Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Springs Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Red River Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility Red River Hot...

  6. Columbia River PUD- Commercial Energy Efficiency Rebate Programs

    Broader source: Energy.gov [DOE]

    Columbia River PUD offers a variety of rebates to commercial and industrial customers who make energy saving improvements to facilities. Visit Columbia River PUD's website for specific program...

  7. PIA - Savannah River Nuclear Solution SRNS ProRad Environment...

    Office of Environmental Management (EM)

    SRNS ProRad Environment Management PIA - Savannah River Nuclear Solution SRNS ProRad Environment Management PIA - Savannah River Nuclear Solution SRNS ProRad Environment Management ...

  8. 2013 Annual Planning Summary for the Office of River Protection...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    River Protection and Richland Operations Office 2013 Annual Planning Summary for the Office of River Protection and Richland Operations Office The ongoing and projected ...

  9. Geothermometry At New River Area (DOE GTP) | Open Energy Information

    Open Energy Info (EERE)

    New River Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geothermometry At New River Area (DOE GTP) Exploration Activity Details...

  10. Refraction Survey At Snake River Plain Region (DOE GTP) | Open...

    Open Energy Info (EERE)

    Snake River Plain Region (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Refraction Survey At Snake River Plain Region (DOE GTP)...

  11. Magnetotellurics At New River Area (DOE GTP) | Open Energy Information

    Open Energy Info (EERE)

    New River Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Magnetotellurics At New River Area (DOE GTP) Exploration Activity...

  12. Jichuan Taiyang River Hydro Power Development Co Ltd | Open Energy...

    Open Energy Info (EERE)

    Jichuan Taiyang River Hydro Power Development Co Ltd Jump to: navigation, search Name: Jichuan Taiyang River Hydro Power Development Co., Ltd. Place: Sichuan Province, China Zip:...

  13. Yunnan Daoyao County Duodi River Hydro Power Development Co Ltd...

    Open Energy Info (EERE)

    Daoyao County Duodi River Hydro Power Development Co Ltd Jump to: navigation, search Name: Yunnan Daoyao County Duodi River Hydro Power Development Co., Ltd. Place: Yunnan...

  14. Gansu Diantou Tao River Hydro Power Development Co Ltd | Open...

    Open Energy Info (EERE)

    River Hydro Power Development Co Ltd Jump to: navigation, search Name: Gansu Diantou Tao River Hydro Power Development Co. Ltd. Place: Lanzhou, Gansu Province, China Zip: 730030...

  15. Huanghe Hydropower Development Co Ltd Yellow River Group | Open...

    Open Energy Info (EERE)

    Huanghe Hydropower Development Co Ltd Yellow River Group Jump to: navigation, search Name: Huanghe Hydropower Development Co Ltd (Yellow River Group) Place: Xining, Qinghai...

  16. Hunan Rivers Bioengineering Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    Rivers Bioengineering Co Ltd Jump to: navigation, search Name: Hunan Rivers Bioengineering Co Ltd Place: Yiyang, Hunan Province, China Zip: 413000 Product: The company uses waste...

  17. EA-1973: Kootenai River Restoration at Bonners Ferry, Boundary...

    Energy Savers [EERE]

    73: Kootenai River Restoration at Bonners Ferry, Boundary County, Idaho EA-1973: Kootenai River Restoration at Bonners Ferry, Boundary County, Idaho Summary Bonneville Power...

  18. FY 2006 Washington Savannah River Company, LLC, PER Summary ...

    National Nuclear Security Administration (NNSA)

    FY 2006 Washington Savannah River Company, LLC, PER Summary SUMMARY OF FY 2006 WASHINGTON SAVANNAH RIVER COMPANY, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned ...

  19. FY 2007 Washington Savannah River Company, LLC, PER Summary ...

    National Nuclear Security Administration (NNSA)

    FY 2007 Washington Savannah River Company, LLC, PER Summary SUMMARY OF FY 2007 WASHINGTON SAVANNAH RIVER COMPANY, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned ...

  20. FY 2009 Savannah River Nuclear Solutions, LLC, PER Summary |...

    National Nuclear Security Administration (NNSA)

    FY 2009 Savannah River Nuclear Solutions, LLC, PER Summary SUMMARY OF FY 2009 SAVANNAH RIVER NUCLEAR SOLUTIONS, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  1. FY 2011 Savannah River Nuclear Solutions, LLC, PER Summary |...

    National Nuclear Security Administration (NNSA)

    FY 2011 Savannah River Nuclear Solutions, LLC, PER Summary SUMMARY OF FY 2011 SAVANNAH RIVER NUCLEAR SOLUTIONS, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  2. FY 2010 Savannah River Nuclear Solutions, LLC, PER Summary |...

    National Nuclear Security Administration (NNSA)

    FY 2010 Savannah River Nuclear Solutions, LLC, PER Summary SUMMARY OF FY 2010 SAVANNAH RIVER NUCLEAR SOLUTIONS, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  3. FY 2008 Washington Savannah River Company, LLC, PER Summary ...

    National Nuclear Security Administration (NNSA)

    FY 2008 Washington Savannah River Company, LLC, PER Summary SUMMARY OF FY 2008 WASHINGTON SAVANNAH RIVER COMPANY, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned ...

  4. Yingjiang Nanpian River Electricity Exploring Co Ltd | Open Energy...

    Open Energy Info (EERE)

    Nanpian River Electricity Exploring Co Ltd Jump to: navigation, search Name: Yingjiang Nanpian River Electricity Exploring Co., Ltd. Place: Dehong Dai-Jingpo Autonomous Prefecture,...

  5. Reed River Hot Spring Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    Reed River Hot Spring Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Reed River Hot Spring Geothermal Area Contents 1 Area Overview 2 History and...

  6. PIA - Savannah River Nuclear Solution IBARS Srs Site Apps. Accreditati...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    IBARS Srs Site Apps. Accreditation Boundary PIA - Savannah River Nuclear Solution IBARS Srs Site Apps. Accreditation Boundary PIA - Savannah River Nuclear Solution IBARS Srs Site ...

  7. Savannah River Field Office | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Us Our Operations Management and Budget Office of Civil Rights Workforce Statistics Savannah River Field Office Savannah River Field Office FY15 Year End Report Semi...

  8. Enforcement Letter, Westinghouse Savannah River Company- April 15, 1997

    Broader source: Energy.gov [DOE]

    Issued to Westinghouse Savannah River Company related to Potential Violations of Quality Assurance and Work Process Requirements at the Savannah River Site

  9. Lessons Learned and Best Practices in Savannah River Site Saltstone...

    Office of Environmental Management (EM)

    Lessons Learned and Best Practices in Savannah River Site Saltstone and Tank Farm Performance Assessments Lessons Learned and Best Practices in Savannah River Site Saltstone and...

  10. White River Electric Assn, Inc | Open Energy Information

    Open Energy Info (EERE)

    Assn, Inc Jump to: navigation, search Name: White River Electric Assn, Inc Place: Colorado Website: www.white-river-electric-assoc Twitter: @WREAColorado Facebook: https:...

  11. Mighty Microbes Where Rivers Run (Other) | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    Mighty Microbes Where Rivers Run Citation Details In-Document Search Title: Mighty Microbes Where Rivers Run Microbes and their influential role in Earth's climate take center ...

  12. Elk River Business Incubator Program | Open Energy Information

    Open Energy Info (EERE)

    Business Incubator Program Jump to: navigation, search Name: Elk River Business Incubator Program Place: Minnesota Zip: 55330 Product: Program run by Elk River Energy City....

  13. Injectivity Test At Raft River Geothermal Area (1979) | Open...

    Open Energy Info (EERE)

    navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Injectivity Test At Raft River Geothermal Area (1979) Exploration Activity Details Location Raft River...

  14. Flow Test At Raft River Geothermal Area (1979) | Open Energy...

    Open Energy Info (EERE)

    Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Raft River Geothermal Area (1979) Exploration Activity Details Location Raft River...

  15. Flow Test At Raft River Geothermal Area (2008) | Open Energy...

    Open Energy Info (EERE)

    Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Raft River Geothermal Area (2008) Exploration Activity Details Location Raft River...

  16. Flow Test At Raft River Geothermal Area (2004) | Open Energy...

    Open Energy Info (EERE)

    Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Raft River Geothermal Area (2004) Exploration Activity Details Location Raft River...

  17. Flow Test At Raft River Geothermal Area (2006) | Open Energy...

    Open Energy Info (EERE)

    Flow Test At Raft River Geothermal Area (2006) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Raft River Geothermal Area (2006)...

  18. John C. Barnes of Savannah River Operations named 2012 Facility...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    John C. Barnes of Savannah River Operations named 2012 Facility Representative of the Year John C. Barnes of Savannah River Operations named 2012 Facility Representative of the ...

  19. American Society of Mechanical Engineers/Savannah River National...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    American Society of Mechanical EngineersSavannah River National Laboratory (ASMESRNL) ... American Society of Mechanical EngineersSavannah River National Laboratory (ASMESRNL) ...

  20. DOE Selects Washington River Protection Solutions, LLC for Tank...

    Energy Savers [EERE]

    Washington River Protection Solutions, LLC for Tank Operations Contract at Hanford Site DOE Selects Washington River Protection Solutions, LLC for Tank Operations Contract at ...

  1. Department of Energy Awards Hanford River Corridor Contract To...

    Energy Savers [EERE]

    Hanford River Corridor Contract To Washington Closure, LLC Department of Energy Awards Hanford River Corridor Contract To Washington Closure, LLC March 23, 2005 - 10:56am Addthis ...

  2. Cleanup Performance Prompts Contract Changes at Hanford's River...

    Office of Environmental Management (EM)

    Performance Prompts Contract Changes at Hanford's River Corridor Cleanup Performance Prompts Contract Changes at Hanford's River Corridor June 30, 2015 - 12:00pm Addthis RICHLAND, ...

  3. Small Column Ion Exchange at Savannah River Site Technology Readiness...

    Broader source: Energy.gov (indexed) [DOE]

    Small Column Ion Exchange Technology at Savannah River Site Compilation of TRA Summaries External Technical Review Report for Small Column Ion Exchange Technology at Savannah River ...

  4. Ground Magnetics At Raft River Geothermal Area (1979) | Open...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1979) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Magnetics At Raft River Geothermal Area (1979)...

  5. Numerical Modeling At Raft River Geothermal Area (1983) | Open...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1983) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Numerical Modeling At Raft River Geothermal Area (1983)...

  6. Micro-Earthquake At Raft River Geothermal Area (1979) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Micro-Earthquake At Raft River Geothermal Area (1979) Exploration Activity Details Location Raft River...

  7. Fluid Inclusion Analysis At Raft River Geothermal Area (2011...

    Open Energy Info (EERE)

    Raft River Geothermal Area (2011) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Fluid Inclusion Analysis At Raft River Geothermal Area (2011)...

  8. Cuttings Analysis At Raft River Geothermal Area (1976) | Open...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1976) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Cuttings Analysis At Raft River Geothermal Area (1976)...

  9. Update on the Raft River Geothermal Reservoir | Open Energy Informatio...

    Open Energy Info (EERE)

    the Raft River Geothermal Reservoir Jump to: navigation, search OpenEI Reference LibraryAdd to library Conference Proceedings: Update on the Raft River Geothermal Reservoir...

  10. Groundwater Sampling At Raft River Geothermal Area (1974-1982...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Groundwater Sampling At Raft River Geothermal Area (1974-1982) Exploration Activity Details Location Raft River...

  11. Micro-Earthquake At Raft River Geothermal Area (2011) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Micro-Earthquake At Raft River Geothermal Area (2011) Exploration Activity Details Location Raft River...

  12. Electromagnetic Soundings At Raft River Geothermal Area (1977...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1977) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Electromagnetic Soundings At Raft River Geothermal Area (1977)...

  13. Thermochronometry At Raft River Geothermal Area (1993) | Open...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1993) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Thermochronometry At Raft River Geothermal Area (1993)...

  14. Isotopic Analysis-Fluid At Raft River Geothermal Area (1982)...

    Open Energy Info (EERE)

    GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Isotopic Analysis-Fluid At Raft River Geothermal Area (1982) Exploration Activity Details Location Raft River...

  15. Telluric Survey At Raft River Geothermal Area (1978) | Open Energy...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1978) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Telluric Survey At Raft River Geothermal Area (1978)...

  16. Ground Gravity Survey At Raft River Geothermal Area (1978) |...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity Survey At Raft River Geothermal Area (1978) Exploration Activity Details Location Raft River...

  17. Direct-Current Resistivity Survey At Raft River Geothermal Area...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1983) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Direct-Current Resistivity Survey At Raft River Geothermal Area...

  18. DC Resistivity Survey (Schlumberger Array) At Raft River Geothermal...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1974-1975) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: DC Resistivity Survey (Schlumberger Array) At Raft River...

  19. Development Wells At Raft River Geothermal Area (2004) | Open...

    Open Energy Info (EERE)

    Development Wells At Raft River Geothermal Area (2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Development Wells At Raft River Geothermal...

  20. Self Potential Measurements At Raft River Geothermal Area (1983...

    Open Energy Info (EERE)

    Measurements At Raft River Geothermal Area (1983) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Self Potential Measurements At Raft River...

  1. Audio-Magnetotellurics At Raft River Geothermal Area (1978) ...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1978) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Audio-Magnetotellurics At Raft River Geothermal Area (1978)...

  2. Earth Tidal Analysis At Raft River Geothermal Area (1984) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Earth Tidal Analysis At Raft River Geothermal Area (1984) Exploration Activity Details Location Raft River...

  3. Petrography Analysis At Raft River Geothermal Area (1980) | Open...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1980) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Petrography Analysis At Raft River Geothermal Area (1980)...

  4. Core Analysis At Raft River Geothermal Area (1979) | Open Energy...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1979) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Core Analysis At Raft River Geothermal Area (1979) Exploration...

  5. Geology and alteration of the Raft River geothermal system, Idaho...

    Open Energy Info (EERE)

    Raft River geothermal system, Idaho Jump to: navigation, search OpenEI Reference LibraryAdd to library Conference Proceedings: Geology and alteration of the Raft River geothermal...

  6. Airborne Electromagnetic Survey At Raft River Geothermal Area...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1979) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Airborne Electromagnetic Survey At Raft River Geothermal Area...

  7. Compound and Elemental Analysis At Raft River Geothermal Area...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1981) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Compound and Elemental Analysis At Raft River Geothermal Area...

  8. Isotopic Analysis-Fluid At Raft River Geothermal Area (1977)...

    Open Energy Info (EERE)

    GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Isotopic Analysis-Fluid At Raft River Geothermal Area (1977) Exploration Activity Details Location Raft River...

  9. Earth Tidal Analysis At Raft River Geothermal Area (1982) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Earth Tidal Analysis At Raft River Geothermal Area (1982) Exploration Activity Details Location Raft River...

  10. Earth Tidal Analysis At Raft River Geothermal Area (1980) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Earth Tidal Analysis At Raft River Geothermal Area (1980) Exploration Activity Details Location Raft River...

  11. Chemical Logging At Raft River Geothermal Area (1979) | Open...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1979) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Chemical Logging At Raft River Geothermal Area (1979)...

  12. Acoustic Logs At Raft River Geothermal Area (1979) | Open Energy...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1979) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Acoustic Logs At Raft River Geothermal Area (1979) Exploration...

  13. Fault Mapping At Raft River Geothermal Area (1993) | Open Energy...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1993) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Fault Mapping At Raft River Geothermal Area (1993) Exploration...

  14. Tianlin Baile River Hydropower Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    Baile River Hydropower Co Ltd Jump to: navigation, search Name: Tianlin Baile River Hydropower Co., Ltd. Place: Baise, Guangxi Autonomous Region, China Zip: 533300 Sector: Hydro...

  15. PIA - Savannah River Nuclear Solution SRNS Electronic Document...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SRNS Electronic Document Workflow RECORDS System (EDWS) PIA - Savannah River Nuclear Solution SRNS Electronic Document Workflow RECORDS System (EDWS) PIA - Savannah River Nuclear ...

  16. Enforcement Letter, Westinghouse Savannah River Company- June 4, 1996

    Broader source: Energy.gov [DOE]

    Issued to Westinghouse Savannah River Company related to Potential Violations of the Quality Assurance and Occupational Radiation Protection Rules at the Savannah River Site

  17. Savannah River Site Takes on Another Environmental Cleanup Challenge...

    Office of Environmental Management (EM)

    Savannah River Site Takes on Another Environmental Cleanup Challenge: Coal-Fired Ash Savannah River Site Takes on Another Environmental Cleanup Challenge: Coal-Fired Ash July 29, ...

  18. Micro-Earthquake At Snake River Plain Geothermal Region (1976...

    Open Energy Info (EERE)

    Micro-Earthquake At Snake River Plain Geothermal Region (1976) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Micro-Earthquake At Snake River...

  19. EIS-0509: Mississippi River LNG Project, Plaquemines Parish,...

    Office of Environmental Management (EM)

    9: Mississippi River LNG Project, Plaquemines Parish, Louisiana EIS-0509: Mississippi River LNG Project, Plaquemines Parish, Louisiana SUMMARY The Federal Energy Regulatory ...

  20. Independent Oversight Review, Savannah River Site Salt Waste...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    August 2013 Independent Oversight Review, Savannah River Site Salt Waste Processing Facility - August 2013 August 2013 Review of the Savannah River Site Salt Waste Processing...

  1. Savannah River National Laboratory (SRNL) | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search Logo: Savannah River National Laboratory Name: Savannah River National Laboratory Place: Aiken, South Carolina Zip: 29808 Website: srnl.doe.gov...

  2. Applicability of a Hybrid Retorting Technology in the Green River...

    Broader source: Energy.gov (indexed) [DOE]

    in the Green River Formation that is amenable to commercial development using such hybrid technology. Applicability of a Hybrid Retorting Technology in the Green River ...

  3. Office of River Protection's (ORP) Path to Reinvigorating Technology...

    Office of Environmental Management (EM)

    Office of River Protection's (ORP) Path to Reinvigorating Technology Development Presentation from the 2015 DOE National Cleanup Workshop by Kevin Smith, Manager, Office of River ...

  4. Smith River Rancheria - Feasibility Study for Wind and Biomass...

    Broader source: Energy.gov (indexed) [DOE]

    DOE Tribal Energy Program Program Review Meeting November 18, 2008 Smith River Rancheria Tribal Administrator Russ Crabtree Smith River Rancheria Grants and Contracts Director Ed ...

  5. Smith River Rancheria - Wind and Biomass Power Generation Facility...

    Broader source: Energy.gov (indexed) [DOE]

    Greg Retzlaff Strategic Energy Solutions, Inc. Wind & Biomass Power Generation Smith River Rancheria 2 Smith River Rancheria * Coastal Community of 600 in Northern California and ...

  6. Smith River Rancheria - Wind and Biomass Power Generation Feasibility...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Greg Retzlaff Strategic Energy Solutions, Inc. Wind & Biomass Power Generation Smith River Rancheria 2 Smith River Rancheria * Coastal Community of 600 * Members Living in Oregon * ...

  7. Savannah River Site Environmental Report for 1998

    SciTech Connect (OSTI)

    Arnett, M.

    1999-06-09

    The mission at the Savannah River Site (SRS) is focused primarily on support of the national defense, nonproliferation, and environmental cleanup. SRS-through its prime operating contractor, Westinghouse Savannah River Company-continues to maintain a comprehensive environmental monitoring program.

  8. Waste Isolation Pilot Plant

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Waste Isolation Pilot Plant AFFIDAVIT FOR SURVIVING RELATIVE STATE ) ) ss: COUNTY OF ) That I, , am the...

  9. Ethylene insensitive plants

    DOE Patents [OSTI]

    Ecker, Joseph R.; Nehring, Ramlah; McGrath, Robert B.

    2007-05-22

    Nucleic acid and polypeptide sequences are described which relate to an EIN6 gene, a gene involved in the plant ethylene response. Plant transformation vectors and transgenic plants are described which display an altered ethylene-dependent phenotype due to altered expression of EIN6 in transformed plants.

  10. Polyhydroxyalkanoate synthesis in plants

    DOE Patents [OSTI]

    Srienc, Friedrich; Somers, David A.; Hahn, J. J.; Eschenlauer, Arthur C.

    2000-01-01

    Novel transgenic plants and plant cells are capable of biosynthesis of polyhydroxyalkanoate (PHA). Heterologous enzymes involved in PHA biosynthesis, particularly PHA polymerase, are targeted to the peroxisome of a transgenic plant. Transgenic plant materials that biosynthesize short chain length monomer PHAs in the absence of heterologous .beta.-ketothiolase and acetoacetyl-CoA reductase are also disclosed.

  11. New coal technology to flourish at Kentucky plant

    SciTech Connect (OSTI)

    Blankinship, S.

    2007-08-15

    Within four years a 76 MW (net) advanced supercritical coal unit, TC2, will go into service at the Trimble County power plant on the Ohio River near Louiseville, KY, USA. The unit is designed to burn a blend of eastern bituminous and western sub-bituminous Powder River Basin coals. TC2 is one of four US power plants to receive a $125 m tax credit under the 2005 EPACT Qualifying Advanced Coal Program for high efficiency and low emission generating units. Trimble County is owned and operated by E.ON US subsidiaries Kentucky Utilities and Louiseville Gas & Electric. It was originally designed to accommodate four 500 MW coal-fired units fired by bituminous coal from the Illinois Basin. 1 photo.

  12. In-line chemical sensor deployment in a tritium plant

    SciTech Connect (OSTI)

    Wright, J.S.; Hope, D.T.; Torres, R.D.; Peters, B.; Tovo, L.L.

    2015-03-15

    The Savannah River Tritium Plant (TP) relies on well understood but aging sensor technology for process gas analysis. The use of alternative sensing and detection technologies for in-line and real-time analysis would aid process control and optimization. The TP upgrading follows a 2-phase projects. In the first phase, TP sensing requirements were determined by a team of process experts. Meanwhile, Savannah River National Laboratory sensor experts identified candidate technologies and related them to the TP processing requirements. The resulting road-map links the candidate technologies to actual plant needs. In the second phase an instrument demonstration station was established within a TP glove box in order to provide accurate assessments of how a candidate sensor technology would perform in a contaminated process environment.

  13. Waste Treatment Plant Overview

    Office of Environmental Management (EM)

    Waste Isolation Pilot Plant Waste Isolation Pilot Plant Waste Isolation Pilot Plant | June 2007 Salt Disposal Investigations Waste Isolation Pilot Plant | June 2007 Salt Disposal Investigations The mission of the Waste Isolation Pilot Plant site is to provide permanent, underground disposal of TRU and TRU-mixed wastes (wastes that also have hazardous chemical components). TRU waste consists of clothing, tools, and debris left from the research and production of nuclear weapons. TRU waste is

  14. Plant fatty acid hydroxylases

    DOE Patents [OSTI]

    Somerville, Chris; Broun, Pierre; van de Loo, Frank

    2001-01-01

    This invention relates to plant fatty acyl hydroxylases. Methods to use conserved amino acid or nucleotide sequences to obtain plant fatty acyl hydroxylases are described. Also described is the use of cDNA clones encoding a plant hydroxylase to produce a family of hydroxylated fatty acids in transgenic plants. In addition, the use of genes encoding fatty acid hydroxylases or desaturases to alter the level of lipid fatty acid unsaturation in transgenic plants is described.

  15. Microsoft PowerPoint - DOE Tribal Leader Solar Energy Forum.ppt [Compatibility Mode]

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Utility-Scale Solar Efforts at SRP Stephen Mellentine Senior Planning Analyst, Resource Planning l i j Salt River Project * Third largest public power tilit i th ti utility in the nation * Over 940,000 electric customers in Phoenix area customers in Phoenix area * 7,400 MW generation portfolio p * Largest water provider in Phoenix area * Delivers nearly 1 million acre- feet annually 2 DOE Tribal Leader Solar Energy Forum Mellentine SRP & Arizona Perspective of Utility Solar SRP & Arizona

  16. Waste Treatment and Immobilization Plant Communications Approach Tools and Techniques

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Waste Treatment and Immobilization Plant Communications Approach Author: Suyama, Mattson, Niles, Hudson, Catrell Originating Committee: Tank Waste Version: 1 Revision Date: 3/29/16 Summary The Hanford Advisory Board, following discussions conducted by the Board's committees on Tank Waste, and Public Involvement and Communication along with the U.S. Department of Energy, Office of River Protection (DOE), prepared this assessment and these recommendations for a communications approach regarding

  17. Improved wastewater treatment at Wheeling-Pittsburgh Steel Corporations`s Steubenville East Coke Plant

    SciTech Connect (OSTI)

    Goshe, A.J.; Nodianos, M.J.

    1995-12-01

    Wheeling-Pittsburgh Steel Corporation recently improved its wastewater treatment at it`s by-products coke plant. This has led to greatly improved effluent quality. Excess ammonia liquor, along with wastewater from the light oil recovery plant, desulfurization facility, and coal pile runoff, must be treated prior to being discharged into the Ohio River. This is accomplished using a biological wastewater treatment plant to remove 99.99% of the organic contaminants and ammonia. Biologically treated, clarified wastewater is now polished in the newly constructed tertiary treatment plant.

  18. Wabash River coal gasification repowering project -- first year operation experience

    SciTech Connect (OSTI)

    Troxclair, E.J.; Stultz, J.

    1997-12-31

    The Wabash River Coal Gasification Repowering Project (WRCGRP), a joint venture between Destec Energy, Inc. and PSI Energy, Inc., began commercial operation in November of 1995. The Project, selected by the United States Department of Energy (DOE) under the Clean Coal Program (Round IV) represents the largest operating coal gasification combined cycle plant in the world. This Demonstration Project has allowed PSI Energy to repower a 1950`s vintage steam turbine and install a new syngas fired combustion turbine to provide 262 MW (net) of electricity in a clean, efficient manner in a commercial utility setting while utilizing locally mined high sulfur Indiana bituminous coal. In doing so, the Project is also demonstrating some novel technology while advancing the commercialization of integrated coal gasification combined cycle technology. This paper discusses the first year operation experience of the Wabash Project, focusing on the progress towards achievement of the demonstration objectives.

  19. Five-megawatt geothermal-power pilot-plant project

    SciTech Connect (OSTI)

    Not Available

    1980-08-29

    This is a report on the Raft River Geothermal-Power Pilot-Plant Project (Geothermal Plant), located near Malta, Idaho; the review took place between July 20 and July 27, 1979. The Geothermal Plant is part of the Department of Energy's (DOE) overall effort to help commercialize the operation of electric power plants using geothermal energy sources. Numerous reasons were found to commend management for its achievements on the project. Some of these are highlighted, including: (a) a well-qualified and professional management team; (b) effective cost control, performance, and project scheduling; and (c) an effective and efficient quality-assurance program. Problem areas delineated, along with recommendations for solution, include: (1) project planning; (2) facility design; (3) facility construction costs; (4) geothermal resource; (5) drilling program; (6) two facility construction safety hazards; and (7) health and safety program. Appendices include comments from the Assistant Secretary for Resource Applications, the Controller, and the Acting Deputy Director, Procurement and Contracts Management.

  20. Conference Center | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    UGA-SREL Conference Center front view UGA-SREL Conference Center large conference room Large conference room small conference room Small conference room The University of Georgia - Savannah River Ecology Laboratory Conference Center is a 5,000-square-foot multi-purpose facility located on the U.S. Department of Energy's Savannah River Site (SRS) near Aiken, S.C. The facility is used by the Savannah River Ecology Laboratory, the Department of Energy, schools, businesses, and other groups, to host