Powered by Deep Web Technologies
Note: This page contains sample records for the topic "river operations office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Independent Oversight Review, Savannah River Operations Office...  

Energy Savers [EERE]

Savannah River Operations Office - July 2013 Independent Oversight Review, Savannah River Operations Office - July 2013 July 2013 Review of the Employee Concerns Program at the...

2

Savannah River Operations Office  

Broader source: Energy.gov (indexed) [DOE]

Concurrence: 'WcVlUi. Date: - - - - - - - - - - - - - -- - - - - - - Charles C. Harris, Director, Performance Assurance Division J rey M. Allison, Director, Office of...

3

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

Savannah River Operations Savannah River Operations Office Categorical Exclusion Determinations: Savannah River Operations Office Categorical Exclusion Determinations issued by Savannah River Operations Office. DOCUMENTS AVAILABLE FOR DOWNLOAD September 10, 2013 CX-010669: Categorical Exclusion Determination 484-17D Coal Yard Remediation CX(s) Applied: B6.1 Date: 06/07/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office August 1, 2013 CX-010837: Categorical Exclusion Determination Disassembly, Relocation, and Reassembly of a Metal-framed Quonset Hut CX(s) Applied: B1.22 Date: 08/01/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office August 1, 2013 CX-010836: Categorical Exclusion Determination Subcontractor Roof Repair at 717-12S CX(s) Applied: B1.3

4

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

February 24, 2011 February 24, 2011 CX-005504: Categorical Exclusion Determination Analytical Methods for Radiochemical Measurements CX(s) Applied: B3.6 Date: 02/24/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office February 24, 2011 CX-005503: Categorical Exclusion Determination Drain Line Replacement West of 735-A CX(s) Applied: B1.3 Date: 02/24/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office February 24, 2011 CX-005502: Categorical Exclusion Determination Implement Savannah River National Laboratory Defense Nuclear Facilities Safety Board 2004-2 Gap Closure Activity CX(s) Applied: B2.3 Date: 02/24/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office

5

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

June 20, 2011 June 20, 2011 CX-006372: Categorical Exclusion Determination Well Installations at R-Area Operable Unit CX(s) Applied: B3.1 Date: 06/20/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office June 15, 2011 CX-006373: Categorical Exclusion Determination Connect 735-11A to the Central Plant Chilled Water System CX(s) Applied: B1.3 Date: 06/15/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office June 14, 2011 CX-006375: Categorical Exclusion Determination Replace Transfer Lines with Spare Lines CX(s) Applied: B1.3 Date: 06/14/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office June 14, 2011 CX-006374: Categorical Exclusion Determination

6

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

August 11, 2009 August 11, 2009 CX-000513: Categorical Exclusion Determination Cone Penetration Test sampling at ECODS (Early Construction and Operational Disposal Sites) B3 and B5 CX(s) Applied: B3.1 Date: 08/11/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office August 5, 2009 CX-000511: Categorical Exclusion Determination Isolation of Domestic Water Line, 782-4G CX(s) Applied: B1.3 Date: 08/05/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office August 5, 2009 CX-000512: Categorical Exclusion Determination Tree Removal and Chipping at P-Area Ash Basin and R-Area Ash Basin and P-007 Outfall Date: 08/05/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office

7

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

June 23, 2009 June 23, 2009 CX-000497: Categorical Exclusion Determination F-Canyon Complex Deactivation CX(s) Applied: B1.28 Date: 06/23/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office June 15, 2009 CX-000495: Categorical Exclusion Determination M-Area Chemical Oxidation (MACO) - Installation of Southern Sector Coreholes and Monitoring Wells Date: 06/15/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office June 15, 2009 CX-000496: Categorical Exclusion Determination F Area Hazardous Waste Management Facility Silver Chloride Solution Injection Wells CX(s) Applied: B6.2 Date: 06/15/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office

8

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

September 2, 2009 September 2, 2009 CX-000521: Categorical Exclusion Determination Cut and Cap #325 Steam Supply Header, 261-H Consolidated Incineration Facility CX(s) Applied: B1.27 Date: 09/02/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office September 2, 2009 CX-000520: Categorical Exclusion Determination 690-N (Ford Building) Fire System Isolation and Sanitary Sewer Grouting CX(s) Applied: B1.27 Date: 09/02/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office September 1, 2009 CX-000519: Categorical Exclusion Determination E-Area Box Remediation Project CX(s) Applied: B6.6 Date: 09/01/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office

9

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

August 9, 2010 August 9, 2010 CX-003633: Categorical Exclusion Determination Install Platform and Stairs at F-10 Outfall CX(s) Applied: B2.3 Date: 08/09/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office August 4, 2010 CX-003635: Categorical Exclusion Determination D-Area Chemical Truck Unloading Station CX(s) Applied: B2.5 Date: 08/04/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office August 4, 2010 CX-003636: Categorical Exclusion Determination 484-D Sump Discharge Line Installation CX(s) Applied: B1.3 Date: 08/04/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office July 30, 2010 CX-003640: Categorical Exclusion Determination Howard T. Ricketts Laboratory (HTRL) Lab 134 CX(s) Applied: B3.6

10

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

April 20, 2011 April 20, 2011 CX-005766: Categorical Exclusion Determination Filter Testing with Static Test Cell CX(s) Applied: B3.6 Date: 04/20/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office April 19, 2011 CX-005769: Categorical Exclusion Determination Dismantle and Removal (D&R) and Enhance Chemical Cleaning (ECC) on Waste Tank 8F (General) CX(s) Applied: B1.28 Date: 04/19/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office April 15, 2011 CX-005771: Categorical Exclusion Determination Install Alternate Diesel Generator and Tie-In Connection for HB-Line CX(s) Applied: B2.5 Date: 04/15/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office

11

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

February 23, 2010 February 23, 2010 CX-001128: Categorical Exclusion Determination Closure of 607-10G Septic Tank (Served 661-G) CX(s) Applied: B1.27 Date: 02/23/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office February 23, 2010 CX-001127: Categorical Exclusion Determination Ballistic Resistant Enclosure Hatch Counterbalance CX(s) Applied: B2.5 Date: 02/23/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office February 23, 2010 CX-000878: Categorical Exclusion Determination 293-F Stack Risk Reduction Project CX(s) Applied: B1.28 Date: 02/23/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office February 23, 2010

12

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

October 25, 2010 October 25, 2010 CX-004445: Categorical Exclusion Determination Waste Treatment Plant Secondary Waste Radioactive Fluidized Bed Steam Reforming (Module A) CX(s) Applied: B3.6 Date: 10/25/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office October 15, 2010 CX-004450: Categorical Exclusion Determination Plutonium Glass Sectioning CX(s) Applied: B3.6 Date: 10/15/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office October 15, 2010 CX-004449: Categorical Exclusion Determination Bench Scale Testing to Provide Data on Precipitation Control in the Cesium Nitric Acid Recovery Process CX(s) Applied: B3.6 Date: 10/15/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office October 15, 2010

13

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

December 10, 2010 December 10, 2010 CX-004837: Categorical Exclusion Determination Measurement of Compressive Strength CX(s) Applied: B3.6 Date: 12/10/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office December 7, 2010 CX-004826: Categorical Exclusion Determination Piezometer Well Installation for 1,4-Dioxane Monitoring CX(s) Applied: B3.1 Date: 12/07/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office December 7, 2010 CX-004824: Categorical Exclusion Determination Dismantle and Remove Tank 6 Riser 7 for Waste Determination (WD) Sampling CX(s) Applied: B1.3 Date: 12/07/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office December 7, 2010 CX-004823: Categorical Exclusion Determination Consolidation of K- and L-Area Heavy Water in C-Area

14

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

January 24, 2011 January 24, 2011 CX-005090: Categorical Exclusion Determination Stairway to FM-1H CX(s) Applied: B2.3 Date: 01/24/2011 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office January 21, 2011 CX-005109: Categorical Exclusion Determination Y589, Mobile Digital Radiography Identification System - Station CX(s) Applied: B1.15 Date: 01/21/2011 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office January 20, 2011 CX-005108: Categorical Exclusion Determination Thin Films for Whisker Growth CX(s) Applied: B3.6 Date: 01/20/2011 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office January 19, 2011 CX-005107: Categorical Exclusion Determination Karl Fisher Titration CX(s) Applied: B3.6 Date: 01/19/2011

15

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

November 29, 2010 November 29, 2010 CX-004808: Categorical Exclusion Determination Flowsheet Evaluation for the Neutralization of High Aluminum ? Low Uranium Used Nuclear Fuel (UNF) Solution CX(s) Applied: B3.6 Date: 11/29/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office November 29, 2010 CX-004809: Categorical Exclusion Determination Reactive Gas Reprocessing of Used Nuclear Fuel Simulants CX(s) Applied: B3.6 Date: 11/29/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office November 29, 2010 CX-004806: Categorical Exclusion Determination Volume Measurement of Solids by Gas Pycnometry CX(s) Applied: B3.6 Date: 11/29/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office November 12, 2010 CX-004805: Categorical Exclusion Determination

16

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

December 11, 2009 December 11, 2009 CX-000815: Categorical Exclusion Determination Hydrogen Technology Laboratory 140 - Chromatography, Wet Laboratory CX(s) Applied: B3.6 Date: 12/11/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office December 8, 2009 CX-000819: Categorical Exclusion Determination Thin-Film Development Laboratory CX(s) Applied: B3.6 Date: 12/08/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office December 8, 2009 CX-000820: Categorical Exclusion Determination Vacuum Induction Melting of Metals CX(s) Applied: B3.6 Date: 12/08/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office December 8, 2009 CX-000818: Categorical Exclusion Determination

17

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

March 10, 2010 March 10, 2010 CX-001373: Categorical Exclusion Determination Analytical Development Tritium Support Laboratory for Mass Spectroscopy, Infrared Spectroscopy, and Raman CX(s) Applied: B3.6 Date: 03/10/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office March 10, 2010 CX-001372: Categorical Exclusion Determination On-Dock Rail Straddle Portal Prototype Project, Y580 CX(s) Applied: B3.6 Date: 03/10/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office March 4, 2010 CX-001129: Categorical Exclusion Determination Cut and Cap Firewater Line Tap-Off Near 714-7N CX(s) Applied: B1.3 Date: 03/04/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office

18

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

July 20, 2011 July 20, 2011 CX-006620: Categorical Exclusion Determination Relocate Hydroburst System from 238-H to 234-7H CX(s) Applied: B1.31 Date: 07/20/2011 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office July 18, 2011 CX-006619: Categorical Exclusion Determination Install Seventeen Monitoring Wells Around 715-D CX(s) Applied: B3.1 Date: 07/18/2011 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office July 18, 2011 CX-006618: Categorical Exclusion Determination Disable F-Tank Farm (FTF) Air Compressor Sequencer CX(s) Applied: B1.3 Date: 07/18/2011 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office July 18, 2011 CX-006617: Categorical Exclusion Determination E Area Fire Water Extension CX(s) Applied: B1.15

19

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

April 16, 2010 April 16, 2010 CX-002207: Categorical Exclusion Determination Thin Films for Whisker Growth CX(s) Applied: B3.6 Date: 04/16/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office April 16, 2010 CX-002206: Categorical Exclusion Determination Real-Waste Testing of Enhanced Chemical Cleaning for Sludge Heel Removal CX(s) Applied: B3.6 Date: 04/16/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office April 16, 2010 CX-002208: Categorical Exclusion Determination Monitor Instruments Mass Spectrometer at Aiken County Technology Laboratory CX(s) Applied: B3.6 Date: 04/16/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office

20

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

July 20, 2010 July 20, 2010 CX-003668: Categorical Exclusion Determination Subsurface Soils Exploration for Potential Pit Disassembly and Conversion Project Sandfilter Footprint CX(s) Applied: B3.1 Date: 07/20/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office July 7, 2010 CX-003670: Categorical Exclusion Determination Improvements to L Area Sidewalks CX(s) Applied: B1.3 Date: 07/07/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office July 7, 2010 CX-002984: Categorical Exclusion Determination Improvements to L Area Sidewalks CX(s) Applied: B1.3 Date: 07/07/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office June 25, 2010 CX-003671: Categorical Exclusion Determination

Note: This page contains sample records for the topic "river operations office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

June 27, 2012 June 27, 2012 CX-008614: Categorical Exclusion Determination Repair Culvert on Road 3 CX(s) Applied: B1.3 Date: 06/27/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office June 27, 2012 CX-008613: Categorical Exclusion Determination Replace Awning, Building 735-A CX(s) Applied: B1.3 Date: 06/27/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office June 26, 2012 CX-008618: Categorical Exclusion Determination Evaluation of Sorbent/Ion Exchangers for Radiochemical and Metal Separations CX(s) Applied: B3.6 Date: 06/26/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office June 26, 2012 CX-008617: Categorical Exclusion Determination Savannah River National Laboratory Building 735-13A Power Addition CX(s) Applied: B1.15

22

CRAD, Conduct of Operations - Office of River Protection K Basin...  

Broader source: Energy.gov (indexed) [DOE]

Conduct of Operations - Office of River Protection K Basin Sludge Waste System CRAD, Conduct of Operations - Office of River Protection K Basin Sludge Waste System May 2004 A...

23

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

March 15, 2013 March 15, 2013 CX-010126: Categorical Exclusion Determination Operation of Induction Furnace Fabrication Lab CX(s) Applied: B3.6 Date: 03/15/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office March 15, 2013 CX-010125: Categorical Exclusion Determination Microfluidics for Advanced Separation and Ultrasensitive Detection CX(s) Applied: B3.6 Date: 03/15/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office March 15, 2013 CX-010131: Categorical Exclusion Determination Replacement of the 254-13H Safety Significant (SS) Standby Diesel Generator CX(s) Applied: B1.25 Date: 03/15/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office March 15, 2013 CX-010130: Categorical Exclusion Determination Mechanical Isolation of Plant Air System at TNX

24

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

9, 2012 9, 2012 CX-008639: Categorical Exclusion Determination Establish Laydown Yard East of 281-3F CX(s) Applied: B1.15 Date: 05/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office May 29, 2012 CX-008638: Categorical Exclusion Determination Excavate to Repair Underground Domestic Water Leak between Tanks 5 and 7 CX(s) Applied: B1.3 Date: 05/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office May 29, 2012 CX-008637: Categorical Exclusion Determination Operation and Maintenance of Inductively Coupled Plasma Mass Spectrometry Method in 773, B142 CX(s) Applied: B3.6 Date: 05/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office May 29, 2012 CX-008636: Categorical Exclusion Determination Analysis of Organic Species by Gas Chromatography (GC) and Gas

25

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

May 21, 2013 May 21, 2013 CX-010489: Categorical Exclusion Determination Salt Batch 7 Qualification CX(s) Applied: B3.6 Date: 05/21/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office May 14, 2013 CX-010497: Categorical Exclusion Determination Electrical Operations to Perform Yard Maintenance in Electrical Substations CX(s) Applied: B1.3 Date: 05/14/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office May 14, 2013 CX-010496: Categorical Exclusion Determination Corrosion Tests on Carbon Steel Exposed to Oxalic Acid and a Sludge Simulant CX(s) Applied: B3.6 Date: 05/14/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office May 14, 2013 CX-010495: Categorical Exclusion Determination Advanced Fuel Cycle Initiative (AFCI) Am/Cm Separations

26

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

November 29, 2012 November 29, 2012 CX-009607: Categorical Exclusion Determination 772-F Low-Activity Drain (LAD) Discharge Header Modification CX(s) Applied: B1.3 Date: 11/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office November 29, 2012 CX-008651: Categorical Exclusion Determination Dismantle and Remove (D&R) and Replace 773-A D-Wing Air Handling and Condensing Units CX(s) Applied: B1.3 Date: 05/17/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office November 29, 2012 CX-009608: Categorical Exclusion Determination Refurbish 607-53C Sanitary Sewer Lift Station CX(s) Applied: B1.3 Date: 11/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office November 27, 2012 CX-009611: Categorical Exclusion Determination

27

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

July 31, 2013 July 31, 2013 CX-010844: Categorical Exclusion Determination Subcontractor Repair of Leak Over Entry Door #1 at 703-B CX(s) Applied: B1.3 Date: 07/31/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office July 30, 2013 CX-010846: Categorical Exclusion Determination Install Stud, Shims, and Nut in the L-Basin 70-Ton Cask Lid Support Structure CX(s) Applied: B2.5 Date: 07/30/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office July 23, 2013 CX-010850: Categorical Exclusion Determination Install Well Pump into the F-Tank Farm Catch Tank FL-241901-WTS-TK-1 CX(s) Applied: B1.3 Date: 07/23/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office July 23, 2013 CX-010849: Categorical Exclusion Determination

28

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

August 13, 2013 August 13, 2013 CX-011158: Categorical Exclusion Determination Subcontractor Repair of Roof Leaks at 717-11A CX(s) Applied: B1.3 Date: 08/13/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office August 13, 2013 CX-011157: Categorical Exclusion Determination Subcontractor Roof Repairs in Telecom Room at 702-C CX(s) Applied: B1.3 Date: 08/13/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office August 8, 2013 CX-011163: Categorical Exclusion Determination Subcontractor Repair of Roof Leaks at 730-4B CX(s) Applied: B1.3 Date: 08/08/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office August 8, 2013 CX-011162: Categorical Exclusion Determination Subcontractor Repair of Roof Leaks at 730-1B CX(s) Applied: B1.3

29

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

April 16, 2013 April 16, 2013 CX-010322: Categorical Exclusion Determination Research and Development Welding and Brazing Sample Preparation and Activities in Building 723-A CX(s) Applied: B3.6 Date: 04/16/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office April 16, 2013 CX-010321: Categorical Exclusion Determination Destructive Evaluation of Plutonium Storage Can Bundles CX(s) Applied: B3.6 Date: 04/16/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office April 16, 2013 CX-010320: Categorical Exclusion Determination Corrosion Testing in Aqueous Solutions CX(s) Applied: B3.6 Date: 04/16/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office April 15, 2013 CX-010324: Categorical Exclusion Determination 772-F Chase 174 Sprinkler Modification

30

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

July 24, 2012 July 24, 2012 CX-009067: Categorical Exclusion Determination Deactivation and Decommissioning of the D-Area Detritiation Cells and Relocation of Associated Handi-Houses CX(s) Applied: B1.23 Date: 07/24/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office July 24, 2012 CX-009066: Categorical Exclusion Determination Characterization of Downgradient Volatile Organic Compounds Plume and Installation of Monitoring Well CX(s) Applied: B3.1 Date: 07/24/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office July 24, 2012 CX-009065: Categorical Exclusion Determination Installation of Sentinel Wells ASB011B/011C for A-2 Air Stripper Shutdown CX(s) Applied: B3.1 Date: 07/24/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office

31

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

July 20, 2012 July 20, 2012 CX-009070: Categorical Exclusion Determination A-Area Alternate Fire Water Supply CX(s) Applied: B1.3 Date: 07/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office July 20, 2012 CX-009069: Categorical Exclusion Determination Remove and Dispose of 107 A & B Tanks and Support Structure CX(s) Applied: B6.1 Date: 07/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office July 20, 2012 CX-009068: Categorical Exclusion Determination Hydrogen Charging Tritium Contaminated Metals CX(s) Applied: B3.6 Date: 07/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office July 16, 2012 CX-009077: Categorical Exclusion Determination F-Area Infrasturcture Improvement CX(s) Applied: B1.23 Date: 07/16/2012

32

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

August 30, 2012 August 30, 2012 CX-009100: Categorical Exclusion Determination Cooling Tower Water Sampling and Analysis for Legionella Pneumophila Density CX(s) Applied: B3.6 Date: 08/30/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office August 29, 2012 CX-009106: Categorical Exclusion Determination Dismantle/Remove Vacuum System and Related Equipment in 772-F CX(s) Applied: B1.3 Date: 08/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office August 29, 2012 CX-009105: Categorical Exclusion Determination 284-H Track Coal Hopper Pit Modifications CX(s) Applied: B1.28 Date: 08/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office August 29, 2012 CX-009104: Categorical Exclusion Determination Infrastructure Modification for the Mobile Plutonium Facility (MPF) at the

33

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

June 20, 2013 June 20, 2013 CX-010655: Categorical Exclusion Determination Roof Repair on Crane Maintenance Area Roof CX(s) Applied: B1.3 Date: 06/20/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office June 18, 2013 CX-010657: Categorical Exclusion Determination Western Sector Treatment System Soil Vapor Extraction Wells CX(s) Applied: B3.1 Date: 06/18/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office June 18, 2013 CX-010656: Categorical Exclusion Determination Stormwater Drainage Repair CX(s) Applied: B1.3 Date: 06/18/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office June 17, 2013 CX-010662: Categorical Exclusion Determination Reroute Diesel Water Cooling Line at 241-125H CX(s) Applied: B1.3 Date: 06/17/2013

34

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

January 17, 2012 January 17, 2012 CX-007642: Categorical Exclusion Determination Parking Lot Construction North of Pad 717-14F CX(s) Applied: B1.15 Date: 01/17/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office January 4, 2012 CX-007646: Categorical Exclusion Determination Insulation removal work in F-Tank Farm CX(s) Applied: B1.3 Date: 01/04/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office January 4, 2012 CX-007645: Categorical Exclusion Determination Nonproliferation Technology Section - Nanomaterials Research CX(s) Applied: B3.6 Date: 01/04/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office December 29, 2011 CX-007650: Categorical Exclusion Determination Control Room Consolidation CX(s) Applied: B2.2

35

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

November 1, 2012 November 1, 2012 CX-009620: Categorical Exclusion Determination Next Generation Solvent (NGS) Real Waste Testing CX(s) Applied: B3.6 Date: 11/01/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office October 31, 2012 CX-009624: Categorical Exclusion Determination High Activity Waste Trailer (HAWT) Disposition CX(s) Applied: B3.1 Date: 10/31/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office October 31, 2012 CX-009623: Categorical Exclusion Determination Technetium Precipitation Batch Testing CX(s) Applied: B3.6 Date: 10/31/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office October 25, 2012 CX-009625: Categorical Exclusion Determination Preparation and Temperature-Time Settling Treatment of Rheology Samples

36

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

February 7, 2012 February 7, 2012 CX-007967: Categorical Exclusion Determination Electrochemical Fluorination in Molten Fluoride Salts CX(s) Applied: B3.6 Date: 02/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office February 7, 2012 CX-007966: Categorical Exclusion Determination Sampling of Legacy Material for Material, Control & Accountability (MC&A) Verification CX(s) Applied: B3.6 Date: 02/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office February 7, 2012 CX-007965: Categorical Exclusion Determination Grout Formulation & Variability Testing CX(s) Applied: B3.6 Date: 02/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office February 6, 2012 CX-007971: Categorical Exclusion Determination

37

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

November 7, 2011 November 7, 2011 CX-007671: Categorical Exclusion Determination Heat Exchanger Removal and Disposition CX(s) Applied: B6.1 Date: 11/07/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office November 7, 2011 CX-007670: Categorical Exclusion Determination Maintenance Excavation of the B-07 Outfall Ditch CX(s) Applied: B1.3 Date: 11/07/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office November 7, 2011 CX-007669: Categorical Exclusion Determination Vegetative Response to Metal Exposure in a Growing Media CX(s) Applied: B3.6 Date: 11/07/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office October 27, 2011 CX-007672: Categorical Exclusion Determination Sampling of Nuclear Fuel Assembly CX(s) Applied: B3.6

38

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

December 17, 2009 December 17, 2009 CX-000810: Categorical Exclusion Determination Ceramic Synthesis and Gas Permeation Measurements in 735-11A CX(s) Applied: B3.6 Date: 12/17/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office December 17, 2009 CX-000809: Categorical Exclusion Determination Cut, Remove and Replace Off-Gas Exhaust Fan #2 and #3 foundation and Replace Air Monitor Fan #1 and #2 CX(s) Applied: B1.3 Date: 12/17/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office December 17, 2009 CX-000808: Categorical Exclusion Determination Howard T. Ricketts Regional Biocontainment Laboratory 134 CX(s) Applied: B3.6 Date: 12/17/2009 Location(s): Aiken, South Carolina

39

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

May 16, 2011 May 16, 2011 CX-006405: Categorical Exclusion Determination 707-C Storm Drain Repairs CX(s) Applied: B1.3 Date: 05/16/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office May 13, 2011 CX-006406: Categorical Exclusion Determination Silver Chloride Injection at the F Area Hazardous Waste Management Facilities Barrier Wall CX(s) Applied: B6.9 Date: 05/13/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office May 12, 2011 CX-006407: Categorical Exclusion Determination Removal of Inactive Chromate Water Isolation Valves CRW-V-170 and CRW-V-175 and Installation of 3 Inch Blind Flanges for F-area New Hill CX(s) Applied: B1.3 Date: 05/12/2011 Location(s): Aiken, South Carolina

40

The Hanford Site Richland Operations Office Office of River Protection Office of Science  

E-Print Network [OSTI]

The Hanford Site Richland Operations Office Office of River Protection Office of Science Plateau;HANFORDSMALLBUSINESSCOUNCIL Richland Operations Office Sally A. Sieracki Small Business Program Manager E-mail: sally.sieracki@rl.doe.gov Web Site: www.hanford.gov/rl Office of River Protection Susan C. Johnson Small Business Program

Note: This page contains sample records for the topic "river operations office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

U. S. Department of Energy Savannah River Operations Office ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Ronald T. Bartholomew Ronald T. Bartholomew Director - Office of Safeguards, Security and Emergency Services U. S. Department of Energy Savannah River Operations Office Ronald T....

42

U. S. Department of Energy Savannah River Operations Office ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Contracts Contractor Performance DOE Seal U. S. Department of Energy Savannah River Operations Office P. O. Box A Aiken, SC 29802 (803) 952-7697 Site Operator: (803)...

43

PIA - Savannah River Operations Office Executive Commitment Action...  

Office of Environmental Management (EM)

River Operations Office Executive Commitment Action Tracking System More Documents & Publications PIA - GovTrip (DOE data) PIA - Bonneville Power Adminstration Ethics Helpline...

44

2011 Annual Planning Summary for Savannah River Operations Office (SRS)  

Broader source: Energy.gov [DOE]

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Savannah River Operations Office (SRS) (See also Environmental Management).

45

2010 Annual Planning Summary for Savannah River Operations Office...  

Energy Savers [EERE]

Savannah River Operations Office (SRS) Annual Planning Summaries briefly describe the status of ongoing NEPA compliance activities, any EAs expected to be prepared in the next 12...

46

U. S. Department of Energy Savannah River Operations Office ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Contacts Contacts Savannah River Operations Office U. S. Department of Energy P. O. Box A Aiken, SC 29802 Office of External Affairs - (803) 952-7697 DOE Seal U. S. Department of...

47

U. S. Department of Energy Savannah River Operations Office ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

PDF 4th Quarter FY 2013 Adobe Acrobat PDF DOE Seal U. S. Department of Energy Savannah River Operations Office P. O. Box A Aiken, SC 29802 (803) 952-7697 Site Operator: (803)...

48

U. S. Department of Energy Savannah River Operations Office ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

- September 30, 2011 Adobe Acrobat PDF DOE Seal U. S. Department of Energy Savannah River Operations Office P. O. Box A Aiken, SC 29802 (803) 952-7697 Site Operator: (803)...

49

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

October 3, 2011 October 3, 2011 CX-006944: Categorical Exclusion Determination Remove Insulation from High Point Flush Pump Drain Valve CX(s) Applied: B1.3 Date: 10/03/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, National Energy Technology Laboratory September 29, 2011 CX-006946: Categorical Exclusion Determination Operation of Accredited Industrial Hygiene (IH) Laboratory in Building 772-F, Revision 1 CX(s) Applied: B3.6 Date: 09/29/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, National Energy Technology Laboratory September 28, 2011 CX-006955: Categorical Exclusion Determination Repair Radiological Fixative Coatings in F Tank Farm CX(s) Applied: B1.3 Date: 09/28/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Sandia Site Office

50

Categorical Exclusion Determinations: Savannah River Operations Office |  

Broader source: Energy.gov (indexed) [DOE]

September 14, 2011 September 14, 2011 CX-006968: Categorical Exclusion Determination Sampling Cooling Tower Water at Savannah River Site and Performing and Analysis for Legionella Pneumophila Density CX(s) Applied: B3.1 Date: 09/14/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, National Energy Technology Laboratory September 14, 2011 CX-006987: Categorical Exclusion Determination Reconfigure and Standardize Piping to Floor Drain in Pump Pit 281-9H CX(s) Applied: B1.3 Date: 09/14/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, National Energy Technology Laboratory September 14, 2011 CX-006970: Categorical Exclusion Determination Replace Wooden Poles Around K Area CX(s) Applied: B1.3 Date: 09/14/2011 Location(s): Aiken, South Carolina

51

Operational Awareness Visit at the Office of River Protection  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

HAIR-HANFORD-2013-05-13 HAIR-HANFORD-2013-05-13 Site: HANFORD - Office of River Protection Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for Operational Awareness at the Office of River Protection Dates of Activity : 05/13-23/2013 Report Preparer: Robert. E. Farrell Activity Description/Purpose: The Office of Health, Safety and Security (HSS) Office of Safety and Emergency Management Evaluations (HS-45) Site Lead conducted an operational awareness visit to the Office of River Protection (ORP) to observe contractor efforts to develop a hazards analysis for the Low Activity Waste facility of the Waste Treatment and Immobilization Plant (WTP), tour the WTP construction site, observe ORP's quality assurance audit of the WTP contractor (Bechtel National, Inc.), tour the

52

Operational Awareness Visit at the Office of River Protection  

Broader source: Energy.gov (indexed) [DOE]

HAIR-HANFORD-2013-05-13 HAIR-HANFORD-2013-05-13 Site: HANFORD - Office of River Protection Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for Operational Awareness at the Office of River Protection Dates of Activity : 05/13-23/2013 Report Preparer: Robert. E. Farrell Activity Description/Purpose: The Office of Health, Safety and Security (HSS) Office of Safety and Emergency Management Evaluations (HS-45) Site Lead conducted an operational awareness visit to the Office of River Protection (ORP) to observe contractor efforts to develop a hazards analysis for the Low Activity Waste facility of the Waste Treatment and Immobilization Plant (WTP), tour the WTP construction site, observe ORP's quality assurance audit of the WTP contractor (Bechtel National, Inc.), tour the

53

U. S. Department of Energy Savannah River Operations Office ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of G4S-Government Solutions, is contracted by the U.S. Department of Energy's Savannah River Operations Office to provide security support services for the 310-square-mile...

54

U. S. Department of Energy Savannah River Operations Office ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Manager for Nuclear Material Stabilization Project U. S. Department of Energy Savannah River Operations Office Pat McGuire Patrick W. (Pat) McGuire was named the Assistant Manager...

55

U. S. Department of Energy Savannah River Operations Office ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

T. Zack Smith T. Zack Smith Deputy Manager U. S. Department of Energy Savannah River Operations Office T. Zack Smith Mr. Smith is the Deputy Manager for the U. S. Department of...

56

Savannah River Operations Office Interim Management of Nuclear  

Broader source: Energy.gov (indexed) [DOE]

0 0 Federal Register / Vol. 62, No. 70 / Friday, April 11, 1997 / Notices 1 The term ''failed'' means that the cladding on the fuel has been breached. The ROD, 60 Fed. Reg. 65300 (December 19, 1995), stated that failed fuel is indicated by gas releases from a fuel storage canister or visible failure of the cladding or canisters. select samples for specialized surveys for example on children's services or on access for persons with disabilities. [FR Doc. 97-9341 Filed 4-10-97; 8:45 am] BILLING CODE 4000-01-P DEPARTMENT OF ENERGY Savannah River Operations Office Interim Management of Nuclear Materials at the Savannah River Site AGENCY: Department of Energy. ACTION: Supplemental record of decision and supplement analysis determination. SUMMARY: The U.S. Department of Energy (DOE) prepared a final

57

2014 Annual Planning Summary for the NNSA Savannah River Operations Office  

Broader source: Energy.gov [DOE]

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2014 and 2015 within the NNSA Savannah River Operations Office.

58

Qualifying Officials Designation Letter - Savannah River Operations Office  

Broader source: Energy.gov (indexed) [DOE]

DOEP IUUI DOEP IUUI United States Government Department of Energy (DOE) memorandum Savannah River Operations Office (SR) DATE: REPLY TO ATTN OF: SUBJECT: NOV 3 o 2010 MGR (Moody, 2-9468) Technical Qualification Program (TQP) Qualifying Officials (QO) ro: DISTRIBUTION Each employee whose name appears on the attached listings is designated as a TQP QO. You were chosen by your supervisor because you have demonstrated an in-depth level of knowledge and abilities in the functional area or functional competency for which you are designated. As a designated TQP QO, you play a significant role in the qualification process of TQP participants and have a grave responsibility for maintaining the intent and integrity of the program. Your signature on the qualification record validates the

59

CRAD, Conduct of Operations - Office of River Protection K Basin Sludge  

Broader source: Energy.gov (indexed) [DOE]

Office of River Protection K Basin Office of River Protection K Basin Sludge Waste System CRAD, Conduct of Operations - Office of River Protection K Basin Sludge Waste System May 2004 A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a May 2004 assessment of the Conduct of Operations program at the Office of River Protection, K Basin Sludge Waste System. CRADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, Conduct of Operations - Office of River Protection K Basin Sludge Waste System More Documents & Publications CRAD, Occupational Safety & Health - Office of River Protection K Basin

60

Independent Oversight Review of the Employee Concerns Program at the Savannah River Operations Office, July 2013  

Broader source: Energy.gov (indexed) [DOE]

of the of the Employee Concerns Program at the Savannah River Operations Office May 2011 February 2013 July 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U. S. Department of Energy Table of Contents 1.0 Purpose.................................................................................................................................................... 1 2.0 Background ............................................................................................................................................. 1 3.0 Scope and Methodology ......................................................................................................................... 2 4.0 Results .................................................................................................................................................... 2

Note: This page contains sample records for the topic "river operations office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

U. S. Department of Energy Savannah River Operations Office ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Savannah River Site Liquid Waste System Plans Archive Savannah River Site Liquid Waste System Plans Archive SRR-LWP-2009-00001 R-18 (June 2013) Adobe Acrobat PDF SRR-LWP-2009-00001...

62

U. S. Department of Energy Savannah River Operations Office ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Infrastructure and Environmental Stewardship Ronald T. Bartholomew - Office of Safeguards, Security and Emergency Services Douglas E. Hintze - Assistant Manager for Mission...

63

CRAD, Conduct of Operations- Office of River Protection K Basin Sludge Waste System  

Broader source: Energy.gov [DOE]

A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a May 2004 assessment of the Conduct of Operations program at the Office of River Protection, K Basin Sludge Waste System.

64

Savannah River Operations Office Interim Managemnet of Nuclear  

Broader source: Energy.gov (indexed) [DOE]

099 099 Federal Register / Vol. 62, No. 220 / Friday, November 14, 1997 / Notices Barbara A. Carmichael, Alternate Air Force Federal Register Liaison Officer. [FR Doc. 97-29919 Filed 11-13-97; 8:45 am] BILLING CODE 3910-01-P DEPARTMENT OF EDUCATION Notice of Proposed Information Collection Requests AGENCY: Department of Education. ACTION: Proposed collection; comment request. SUMMARY: The Deputy Chief Information Officer, Office of the Chief Information Officer, invites comments on the proposed information collection requests as required by the Paperwork Reduction Act of 1995. DATES: Interested persons are invited to submit comments on or before January 13, 1998. ADDRESSES: Written comments and requests for copies of the proposed information collection requests should be addressed to Patrick J. Sherrill,

65

U. S. Department of Energy Savannah River Operations Office ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

or after December 31, 2008, may obtain the date received by this office and the estimated completion date by clicking the FOIA listing Adobe Acrobat PDF . You will need to know...

66

U. S. Department of Energy Savannah River Operations Office ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

supervising Federal facility representatives, who are responsible for overseeing conduct of operations by the contractor for nuclear material processing and storage...

67

U. S. Department of Energy Savannah River Operations Office - DOE-SR News  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Releases Releases DOE-SR News Releases GROUTING TO BEGIN TOMORROW ON TWO ADDITIONAL SRS WASTE TANKS SR-2013-08 Adobe Acrobat PDF PARSONS' SALT WASTE PROCESSING FACILITY PROJECT EARNS DOE VOLUNTARY PROTECTION PROGRAM MERIT AWARD SR-2013-07 Adobe Acrobat PDF Public Comment Sought for Savannah River Site Workforce Restructuring Plan SR-2013-06 Adobe Acrobat PDF Savannah River Site Citizens Advisory Board Seeking New Members SR-2013-05 Adobe Acrobat PDF Salt Waste Processing Facility: New Leadership SR-2013-04 Adobe Acrobat PDF Savannah River Site Exceeds Waste Shipment Goals SR-2013-03 Adobe Acrobat PDF Savannah River Operations Office Honors Federal Manager of the Year SR-2013-02 Adobe Acrobat PDF SRS Advisory Board to Hold Augusta Public Meeting March 25-26 SR-2013-01 Adobe Acrobat PDF

68

Office of River Protection (ORP) and Washingotn River Protection Solutions,  

Broader source: Energy.gov (indexed) [DOE]

Office of River Protection (ORP) and Washingotn River Protection Office of River Protection (ORP) and Washingotn River Protection Solutions, LLC (WRPS) Partnering Agreement for the DOE-EM Tank Operations Project Office of River Protection (ORP) and Washingotn River Protection Solutions, LLC (WRPS) Partnering Agreement for the DOE-EM Tank Operations Project The Mission of the Office of River Protection is to safely retrieve and treat Hanford's tank waste and close the Tank Farms to protect the Columbia River. Office of River Protection (ORP) and Washingotn River Protection Solutions, LLC (WRPS) Partnering Agreement for the DOE-EM Tank Operations Project More Documents & Publications 2011 Annual Workforce Analysis and Staffing Plan Report - Office of River Protection Consent Order, Washington River Protection Solutions, LLC - NCO-2011-01

69

Independent Activity Report, Savannah River Operation - June...  

Broader source: Energy.gov (indexed) [DOE]

Operation - June 2010 Independent Activity Report, Savannah River Operation - June 2010 June 2010 Savannah River Operations Office Self-Assessment of the Technical Qualification...

70

Office of River Protection Assessment of Contractor Quality Assurance and Operational Awareness at Tank Farms, June 2013  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

HIAR-HANFORD-2013-06-17 HIAR-HANFORD-2013-06-17 Site: Hanford, Office of River Protection Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for the Office of River Protection (ORP) Assessment of Contractor Quality Assurance, Operational Awareness at Hanford Tank Farms Dates of Activity : June 17-20, 2013 Report Preparer: Robert E. Farrell Activity Description/Purpose: The Office of Health, Safety and Security (HSS), Office of Safety and Emergency Management Evaluations (Independent Oversight) Site Lead conducted an operational awareness visit to the ORP Hanford Tank Farms, observed a Tank Farms morning meeting, toured the C Tank Farm, and observed a heavy (34,000 pound) lift. Result: Independent Oversight, together with the ORP Facility Representative, toured the C Tank Farm to observe workers setting

71

CRAD, Engineering - Office of River Protection K Basin Sludge...  

Broader source: Energy.gov (indexed) [DOE]

System CRAD, Emergency Management - Office of River Protection K Basin Sludge Waste System CRAD, Conduct of Operations - Office of River Protection K Basin Sludge Waste System...

72

CRAD, Management - Office of River Protection K Basin Sludge...  

Broader source: Energy.gov (indexed) [DOE]

CRAD, Emergency Management - Office of River Protection K Basin Sludge Waste System CRAD, Conduct of Operations - Office of River Protection K Basin Sludge Waste System CRAD,...

73

CRAD, Occupational Safety & Health - Office of River Protection...  

Broader source: Energy.gov (indexed) [DOE]

K Basin Sludge Waste System CRAD, Management - Office of River Protection K Basin Sludge Waste System CRAD, Conduct of Operations - Office of River Protection K Basin Sludge Waste...

74

2013 Annual Planning Summary for the Savannah River Operations...  

Office of Environmental Management (EM)

for Savannah River Operations Office 2010 Annual Planning Summary for Savannah River Operations Office (SRS) 2012 Annual Planning Summary for Bonneville Power Administration...

75

Office of River Protection (ORP) and Washingotn River Protection Solutions, LLC (WRPS) Partnering Agreement for the DOE-EM Tank Operations Project  

Broader source: Energy.gov [DOE]

The Mission of the Office of River Protection is to safely retrieve and treat Hanford's tank waste and close the Tank Farms to protect the Columbia River.

76

Independent Oversight Inspection, Richland Operations Office, Office of  

Broader source: Energy.gov (indexed) [DOE]

Richland Operations Office, Richland Operations Office, Office of River Protection, and Project Hanford Management Contract - November 2006 Independent Oversight Inspection, Richland Operations Office, Office of River Protection, and Project Hanford Management Contract - November 2006 November 2006 Inspection of Classification and Information Control Programs at the Richland Operations Office, Office of River Protection, and Project Hanford Management Contract This report presents the results of inspection activities by the U.S. Department of Energy (DOE) Office of Independent Oversight, Office of Security Evaluations in the area of classification and information control (CIC) at the two DOE offices at the Hanford Site-the Richland Operations Office (RL) and the Office of River Protection (ORP)-each of which

77

Independent Specific Administrative Controls Review, Office of River  

Broader source: Energy.gov (indexed) [DOE]

Office of Office of River Protection - December 2010 Independent Specific Administrative Controls Review, Office of River Protection - December 2010 December 2010 Specific Administrative Controls Review with the Office of Environmental Management at the Office of River Protection The U.S. Department of Energy Office of Independent Oversight, within the Office of Health, Safety and Security, participated in an Office of Environmental Management Office of Standards and Quality Assurance, EM-23, review of Specific Administrative Controls (SAC). The EM-23 review included selected Office of River Protection programs at the Hanford Site. Independent Specific Administrative Controls Review, Office of River Protection - December 2010 More Documents & Publications Independent Specific Administrative Controls Review, Richland Operations

78

U. S. Department of Energy Savannah River Operations Office - DOE-SR News  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Release Archive Release Archive DOE-SR News Release Archive 2012 News Releases Savannah River Site Reaches Significant Milestone with Waste Tank Closure SR-2012-06 Adobe Acrobat PDF DOE to Extend Savannah River Nuclear Solutions Contract at Savannah River Site to September 2016 SR-2012-05 Adobe Acrobat PDF Savannah River Site Federal Employees Volunteer for United Way Campaign SR-2012-04 Adobe Acrobat PDF Installation of Six Large Process Tanks Mark Big Step in Construction of Critical Waste Cleanup Facility at SRS SR-2012-03 Adobe Acrobat PDF Grouting Begins on First SRS Waste Tanks Since 1997 SR-2012-02 Adobe Acrobat PDF SRS Marks Successful Operational Startup of New Biomass Cogeneration Facility SR-2012-01 Adobe Acrobat PDF 2011 News Releases Recovery Act Funds Test Reactor Dome Removal in Historic D&D Project

79

Independent Activity Report, Savannah River Operation - June 2010 |  

Broader source: Energy.gov (indexed) [DOE]

Savannah River Operation - June 2010 Savannah River Operation - June 2010 Independent Activity Report, Savannah River Operation - June 2010 June 2010 Savannah River Operations Office Self-Assessment of the Technical Qualification Program The U.S. Department of Energy (DOE), Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), participated in the DOE Savannah River Operations Office (DOE-SR) self-assessment of the Technical Qualification Program (TQP). Independent Activity Report, Savannah River Operation - June 2010 More Documents & Publications Independent Oversight Review, Savannah River Operations Office - July 2013 Independent Activity Report, Savannah River Remediation - July 2010 2011 Annual Workforce Analysis and Staffing Plan Report - Savannah River

80

Independent Oversight Inspection of Environment, Safety, and Health Programs at the Savannah River Operations Office and Savannah River Site, January 2010  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy (DOE) Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), inspected environment, safety, and health (ES&H) programs at the DOE Savannah River Site.

Note: This page contains sample records for the topic "river operations office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Geoff Tyree, DOE Richland Operations Office  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

JOBS: HANFORD SITE HANFORD FUNDS (as of April 26, 2010) Allocated Spent to Date DOE Richland Operations Office 1,634,500,000 414,111,226 DOE Office of River Protection...

82

Independent Oversight Activity Report, Office of River Protection...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

May 2013 May 2013 Operational Awareness Visit at the Office of River Protection HAIR-HANFORD-2013-05-13 The Office of Health, Safety and Security (HSS) Office of Safety and...

83

Independent Oversight Activity Report, Office of River Protection - May  

Broader source: Energy.gov (indexed) [DOE]

Office of River Protection - Office of River Protection - May 2013 Independent Oversight Activity Report, Office of River Protection - May 2013 May 2013 Operational Awareness Visit at the Office of River Protection [HAIR-HANFORD-2013-05-13] The Office of Health, Safety and Security (HSS) Office of Safety and Emergency Management Evaluations (HS-45) Site Lead conducted an operational awareness visit to the Office of River Protection (ORP) to observe contractor efforts to develop a hazards analysis for the Low Activity Waste facility of the Waste Treatment and Immobilization Plant (WTP), tour the WTP construction site, observe ORP's quality assurance audit of the WTP contractor (Bechtel National, Inc.), tour the Hanford Tank Farms, and observe tank waste retrieval operations. Independent Oversight Activity Report, Office of River Protection - May

84

Savannah River Operations Office P.O. Box A Aiken, South Carolina...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

South Carolina 29802 BUSINESS SENSITIVE OEC 1 0 tuu9 Mr. Garry Flowen, President &. CEO Savannah River Nuclear Solutions, LLC Building 730- I a, Room 333 Aiken. SC 29808 Dear Mr....

85

2013 Annual Workforce Analysis and Staffing Plan Report- Savannah River Operations Office  

Broader source: Energy.gov [DOE]

Managers perform an annual workforce analysis of their organization and develop staffing plans that identify technical capabilities and positions they need to ensure safe operation of defense nuclear facilities.

86

2011 Annual Workforce Analysis and Staffing Plan Report- Savannah River Operations Office  

Broader source: Energy.gov [DOE]

Managers perform an annual workforce analysis of their organization and develop staffing plans that identify technical capabilities and positions they need to ensure safe operation of defense nuclear facilities.

87

2012 Annual Workforce Analysis and Staffing Plan Report- Savannah River Operations Office  

Broader source: Energy.gov [DOE]

Managers perform an annual workforce analysis of their organization and develop staffing plans that identify technical capabilities and positions they need to ensure safe operation of defense nuclear facilities.

88

2014 Annual Workforce Analysis and Staffing Plan Report- Savannah River Operations Office  

Broader source: Energy.gov [DOE]

Managers perform an annual workforce analysis of their organization and develop staffing plans that identify technical capabilities and positions they need to ensure safe operation of defense nuclear facilities.

89

2010 Annual Workforce Analysis and Staffing Plan Report- Savannah River Operations Office  

Broader source: Energy.gov [DOE]

Managers perform an annual workforce analysis of their organization and develop staffing plans that identify technical capabilities and positions they need to ensure safe operation of defense nuclear facilities.

90

Workforce Statistics - Savannah River Field Office | National Nuclear  

National Nuclear Security Administration (NNSA)

Savannah River Field Office | National Nuclear Savannah River Field Office | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Workforce Statistics - Savannah River Field Office Home > About Us > Our Operations > Management and Budget > Office of Civil Rights > Workforce Statistics > Workforce Statistics - Savannah River Field

91

U. S. Department of Energy Savannah River Operations Office - SRS Cold War  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SRS Cold War Historic Preservation SRS Cold War Historic Preservation SRS Cold War Historic Preservation Background on SRS Cold War Historic Preservation Background: The National Historic Preservation Act (NHPA) of 1966, as amended through 2000, requires that all Federal agencies consider the impacts to historic properties in all their undertakings, such as accelerated clean up. DOE-SR has been consulting with the South Carolina State Historic Preservation Office (SHPO) on NHPA. SHPO is the implementing agency for NHPA in South Carolina. Compliance with NHPA is usually done in three steps: 1) inventory resources; 2) evaluate for National Register eligibility; and 3) avoid or mitigate effects to historic properties. DOE-SR inventoried 732 facilities, all of which were constructed between 1950 and 1989. Two hundred and thirty-two SRS structures are considered

92

Categorical Exclusion Determinations: Office of River Protection-Richland  

Broader source: Energy.gov (indexed) [DOE]

August 22, 2011 August 22, 2011 CX-006835: Categorical Exclusion Determination 241-T Tank Farm Debris Barrier Fence CX(s) Applied: B1.11 Date: 08/22/2011 Location(s): Richland, Washington Office(s): River Protection-Richland Operations Office, Golden Field Office August 11, 2011 CX-006490: Categorical Exclusion Determination Bat Roost Tower Construction CX(s) Applied: B1.20 Date: 08/11/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office June 28, 2011 CX-006063: Categorical Exclusion Determination Limited Firebreak Maintenance on the Hanford Site During Calendar Year 2011 CX(s) Applied: B1.3 Date: 06/28/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office June 21, 2011 CX-006092: Categorical Exclusion Determination

93

Home Office Expenses Submitted by Fluor Federal Services, Inc., on Savannah River Nuclear Solutions, LLC's U.S. Department of Energy Management & Operating (M&O) Contract No. DE-AC09-08SR22470  

Broader source: Energy.gov (indexed) [DOE]

Home Office Expenses Submitted by Fluor Home Office Expenses Submitted by Fluor Federal Services, Inc., on Savannah River Nuclear Solutions, LLC's U.S. Department of Energy Management & Operating (M&O) Contract No. DE-AC09-08SR22470 OAS-L-13-08 April 2013 Department of Energy Washington, DC 20585 April 19, 2013 MEMORANDUM FOR THE MANAGER, SAVANNAH RIVER OPERATIONS OFFICE FROM: Rickey R. Hass Deputy Inspector General for Audits and Inspections Office of Inspector General SUBJECT: INFORMATION: Audit Report on "Home Office Expenses Submitted by Fluor Federal Services, Inc., on Savannah River Nuclear Solutions, LLC's U.S. Department of Energy Management & Operating (M&O) Contract No. DE-AC09-08SR22470" BACKGROUND The attached report presents the results of an audit of home office expenses submitted by Fluor

94

San Francisco Operations Office  

Office of Legacy Management (LM)

San Francisco Operations Office San Francisco Operations Office 1333 Broadway Oakland, California 94612 Dr. Joseph 0. Ward, Chief Radiological Health Section Department of Health Services 744 P Street Sacramento, California, 95814 SUBJECT: Certification Docket of Gilman Hall Dear Dr. Ward: The Department of Energy (DOE) has completed and reviewed the remedial ac- tions of Gilman Hall located at the University of California, Berkeley, California. Based on this review, DOE certifies that the condition of Gilman Hall is radiologically acceptable for restricted use under the con- trols of the University of California's State General License 1333-62 pro- vided that the University's Office of Environmental Health and Safety con- tinues to survey Gilman Hall and monitor whenever remodeling or renovation

95

Nevada Operations Office  

Office of Legacy Management (LM)

Nevada Operations Office Nevada Operations Office t' . 0. Box 14100, Las Vegas, NV 89114-4100 Lt. Col. Kent J. Rohlof; USAF Commander 554th Civil Engineering Support Squadron (TAC) Nellis Air Force Base, NV 89191 DISPOSAL OF LIQUID RADIOACTIVE WASTE--NELLIS AIR FORCE BASE Layton O'Neill and Thomas Graham of my office recently visited two sites at Nellis AFB, Area II, identified as locations for burial of radioactive waste. The purpose of this visit was to visually inspect the physical status of the sites, one identified as the location of the subject liquid wastes. Numerous readings were made with a hand-held Ludlum Model 125 Micro-R meter, for the purpose of personnel radiation protection walking into the controlled, posted radioactive waste compounds. No readings were above background.

96

Categorical Exclusion Determinations: Office of River Protection-Richland  

Broader source: Energy.gov (indexed) [DOE]

January 13, 2012 January 13, 2012 CX-007980: Categorical Exclusion Determination Washington River Protection Solutions LLC - Proposed Actions For Calendar Year 2012 Scheduled To Take Place CX(s) Applied: B1.22 Date: 01/13/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office January 13, 2012 CX-007979: Categorical Exclusion Determination Washington River Protection Solutions LLC - Proposed Actions For Calendar Year 2012 Scheduled To Take Place CX(s) Applied: B1.17 Date: 01/13/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office January 13, 2012 CX-007978: Categorical Exclusion Determination Washington River Protection Solutions LLC - Proposed Actions For Calendar Year 2012 CX(s) Applied: B1.16 Date: 01/13/2012 Location(s): Washington

97

Independent Activity Report, Office of River Protection - April 2011 |  

Broader source: Energy.gov (indexed) [DOE]

Independent Activity Report, Office of River Protection - April Independent Activity Report, Office of River Protection - April 2011 Independent Activity Report, Office of River Protection - April 2011 April 2011 Hanford Tank Farms Unreviewed Safety Question Process Review [HIAR-HORP-2011-04-18] The purpose of the activity, which was performed by the Office of Health, Safety and Security (HSS) as part of the Department of Energy (DOE) Office of River Protection's (ORP's) nuclear safety assessment and oversight, was to review and evaluate selected aspects of the Tank Farms Operating Contractor's (TOC's) implementation of the recently revised unreviewed safety question (USQ) procedure. A major aspect of the revised implemented process (Ref. 1) was to eliminate unnecessary screening and to streamline the USQ process by defining facility and procedure changes that are outside

98

Richland/Office of River Protection | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Richland/Office of River Protection Richland/Office of River Protection Richland/Office of River Protection Below are compliance agreements and accompanying summaries for the Richland Operations Office and Office of River Protection at the Hanford site. Settlement Agreement re: Washington v. Bodman, January 6, 2006 Administrative Order, June 13, 2000 Administrative Order, June 13, 2000 Summary Federal Facility Compliance Agreement on Storage of Polychlorinated Biphenyls, August 8, 1996 Federal Facility Compliance Agreement on Storage of Polychlorinated Biphenyls, August 8, 1996 Summary Tank Stabilization September 30, 1999 Tank Stabilization September 30, 1999 Summary U.S. Federal Facility Compliance Agreement for the Hanford Site, February 7, 1994 U.S. Federal Facility Compliance Agreement for the Hanford Site, February

99

CRAD, Emergency Management - Office of River Protection K Basin...  

Broader source: Energy.gov (indexed) [DOE]

Emergency Management - Office of River Protection K Basin Sludge Waste System CRAD, Emergency Management - Office of River Protection K Basin Sludge Waste System May 2004 A section...

100

Categorical Exclusion Determinations: Office of River Protection-Richland  

Broader source: Energy.gov (indexed) [DOE]

14, 2012 14, 2012 CX-009693: Categorical Exclusion Determination CH2MHill Plateau Remediation Company - Site Characterization and Environmental Monitoring, December 2012 to December 2013 CX(s) Applied: B3.1 Date: 12/14/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office December 14, 2012 CX-009692: Categorical Exclusion Determination CH2MHill Plateau Remediation Company - Cleanup Actions, December 2012 to December 2013 CX(s) Applied: B6.1 Date: 12/14/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office December 14, 2012 CX-009673: Categorical Exclusion Determination Washington River Protection Solutions LLC - Facility Safety and Environmental Improvements CX(s) Applied: B2.5 Date: 12/14/2012 Location(s): Washington

Note: This page contains sample records for the topic "river operations office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Albuquerque Operations Office  

Office of Legacy Management (LM)

%r © J~4 %r © J~4 aDepartment of Energy Albuquerque Operations Office P.O. Box 5400 Albuquerue. New Mexico 87118 JUIl 0 198 Vicinity Property No. CA-401 _ U l Address; Mayer Street Bridgeville, Pennsylvania Cyclops Corporation 650 Washington Road Pittsburgh, Pennsylvania 15228 Dear Sir: Under the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, the Department of Energy (DOE) is authorized to conduct remedial action at properties contaminated with residual radioactive material from inactive uranium mill sites. Evaluation of your property identified above has revealed the presence of residual radioactive material in excess of standards established by the Environmental Protection Agency (EPA). Therefore, your property has been formally included by DOE for remedial action in the Uranium Mill Tailings

102

Contractor Fee Payments- Office of River Protection  

Broader source: Energy.gov [DOE]

See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Office of River Protection on these charts.

103

Contractor Fee Payments- Savannah River Site Office  

Broader source: Energy.gov [DOE]

See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Savannah River Site Office on these charts.

104

Categorical Exclusion Determinations: Office of River Protection-Richland  

Broader source: Energy.gov (indexed) [DOE]

5, 2012 5, 2012 CX-009658: Categorical Exclusion Determination Mission Support Alliance Annual Categorical Exclusion for Small-Scale Research and Development, Laboratory Operations, and Pilot Projects under 10 CFR 1021, Subpart D, Appendix B CX(s) Applied: B3.6 Date: 12/05/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office December 5, 2012 CX-009657: Categorical Exclusion Determination Mission Support Alliance Annual Categorical Exclusion for Site Characterization and Environmental Monitoring under 10 CFR 1021, Subpart D, Appendix B CX(s) Applied: B3.1 Date: 12/05/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office December 5, 2012 CX-009656: Categorical Exclusion Determination Mission Support Alliance Annual Categorical Exclusion for Facility Safety

105

CRAD, Management - Office of River Protection K Basin Sludge Waste System |  

Broader source: Energy.gov (indexed) [DOE]

Office of River Protection K Basin Sludge Waste Office of River Protection K Basin Sludge Waste System CRAD, Management - Office of River Protection K Basin Sludge Waste System May 2004 A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a May 2004 assessment of the Management at the Office of River Protection K Basin Sludge Waste System. CRADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, Management - Office of River Protection K Basin Sludge Waste System More Documents & Publications CRAD, Emergency Management - Office of River Protection K Basin Sludge Waste System CRAD, Conduct of Operations - Office of River Protection K Basin Sludge

106

Much Accomplished at Hanford in 2010: Richland Operations Office Prime  

Broader source: Energy.gov (indexed) [DOE]

Much Accomplished at Hanford in 2010: Richland Operations Office Much Accomplished at Hanford in 2010: Richland Operations Office Prime Contractors Cite Past Year's Cleanup Progress Much Accomplished at Hanford in 2010: Richland Operations Office Prime Contractors Cite Past Year's Cleanup Progress January 5, 2011 - 12:00pm Addthis Media Contact Cameron Hardy, DOE (509) 376-5365 Cameron.Hardy@rl.doe.gov RICHLAND, WASH. - The Department of Energy (DOE) Richland Operations Office contractors achieved a great deal of cleanup progress at the Hanford Site in 2010. Below are just some of the major accomplishments of our River Corridor, Central Plateau, and Mission Support contractors: River Corridor To date, approximately half of the cleanup in the Hanford Site's 220-square-mile River Corridor is complete. The River Corridor cleanup

107

Office of Security Operations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Office of Physical Protection Office of Physical Protection Bill Dwyer Director, 202-586-7887 Mission The mission of the Office of Physical Protection is to implement and oversee dedicated human resources, processes, and equipment designed to protect personnel and assets entrusted to our care at Department of Energy (DOE) Headquarters facilities. The Office is comprised of dedicated DOE Federal security professionals, Headquarters Protective Force personnel, and Alarms and Access Control Technicians. These security subject matter experts work together to ensure compliance with DOE Safeguards and Security regulations, Interagency Security Committee guidance, and federal laws. The result of this collaboration is a security program designed to ensure a safe and secure working environment for all Headquarters employees.

108

Removal of 1,082-Ton Reactor Among Richland Operations Offices 2014 Accomplishments  

Broader source: Energy.gov [DOE]

RICHLAND, Wash. Workers with EMs Richland Operations Office and its contractors made progress this year in several areas of Hanford site cleanup that helped protect employees, the public, environment, and Columbia River.

109

Richland Operations Office technology summary  

SciTech Connect (OSTI)

This document has been prepared by the Department of Energy`s Environmental Management Office of Technology Development to highlight its research, development, demonstration, testing, and evaluation activities funded through the Richland Operations Office. Technologies and processes described have the potential to enhance cleanup and waste management efforts.

Not Available

1994-05-01T23:59:59.000Z

110

John C. Barnes of Savannah River Operations named 2012 Facility  

Broader source: Energy.gov (indexed) [DOE]

John C. Barnes of Savannah River Operations named 2012 Facility John C. Barnes of Savannah River Operations named 2012 Facility Representative of the Year John C. Barnes of Savannah River Operations named 2012 Facility Representative of the Year August 20, 2013 - 8:27am Addthis John C. Barnes of Savannah River Operations named 2012 Facility Representative of the Year About 200 Department of Energy (DOE) federal employees are Facility Representatives (FR) who provide day-to-day oversight of contractor operations at DOE facilities. Each year the Department presents the FR of the Year Award to recognize superior service. Mr. John C. Barnes from the Savannah River Operations Office was selected from a field of sixteen nominees as the 2012 DOE FR of the Year. He is responsible for operational oversight of key facilities at the Savannah River Site, including the F and

111

Richland Operations Office  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

treatment and the data should be available by the end of next week. * Status Conduct of Operations There have been several small incidents recently where observations of work...

112

Amended Record of Decision; Savannah River Site Waste Management, Savannah River Operations Office, Aiken, South Carolina (DOE/EIS-0217)(6/28/01)  

Broader source: Energy.gov (indexed) [DOE]

431 431 Federal Register / Vol. 66, No. 125 / Thursday, June 28, 2001 / Notices Avenue, SW., Room 4050, Regional Office Building 3, Washington, DC 20202-4651. Requests may also be electronically mailed to the internet address OCIO_IMG_Issues@ed.gov or faxed to 202-708-9346. Please specify the complete title of the information collection when making your request. Comments regarding burden and/or the collection activity requirements should be directed to Joseph Schubart at (202) 708-9266 or via his internet address Joe.Schubart@ed.gov. Individuals who use a telecommunications device for the deaf (TDD) may call the Federal Information Relay Service (FIRS) at 1-800-877- 8339. [FR Doc. 01-16231 Filed 6-27-01; 8:45 am] BILLING CODE 4000-01-U DEPARTMENT OF EDUCATION National Board of the Fund for the

113

Idaho Operations Office  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

adverse impacts 40 CFR 1508.27 (b)(l): The selected action establishes a capability to conduct outdoor linac operations at higher power and greater standoff distances. The SOX...

114

Independent Activity Report, Office of River Protection Waste...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Lead for the Office of River Protection Waste Treatment Plant and Tank Farms HIAR-HANFORD-2013-02-25 The Office of Health, Safety and Security's (HSS) Office of Safety and...

115

Independent Oversight Review, Savannah River Field Office Tritium  

Broader source: Energy.gov (indexed) [DOE]

Field Office Tritium Field Office Tritium Facilities - November 2013 Independent Oversight Review, Savannah River Field Office Tritium Facilities - November 2013 November 13, 2013 Review of Savannah River Field Office Tritium Facilities Radiological Controls Activity-Level Implementation This report documents the results of an independent oversight review of the radiological protection program at the Savannah River Site (SRS) tritium facilities implemented at the activity-level by Savannah River Nuclear Solutions, LLC and its subcontractors. The review was performed by the Office of Health, Safety and Security's Office of Safety and Emergency Management Evaluations within the broader context of an ongoing program of targeted assessments of radiological control programs, with an emphasis on

116

Office of River Protection (Hanford) - Enforcement Documents  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Enforcement Documents Enforcement Documents Office of River Protection (Hanford) Enforcement Letter issued to Washington River Protection Solutions, LLC, related to a positive Unreviewed Safety Question involving the Tank Farm Waste Transfer System at the Hanford Site, (NEL-2012-01) February 28, 2012 Consent Order issued to Washington River Protection Solutions, LLC related to deficiencies in the corrective action management program, radiation control program, and sealed radioactive source accountability and control program (NCO-2011-01) May 27, 2011 Consent Order issued to Bechtel National, Inc. for Deficiencies in Vendor Commercial Grade Dedication Processes at the Hanford Waste Treatment and Immobilization Plant Project (NCO-2010-03) September 22, 2010 Preliminary Notice of Violation issued to Bechtel National, Inc., related to Deficiencies at the Waste Treatment and Immobilization Plant at the Hanford Site, December 3, 2008 (NEA-2008-04)

117

Categorical Exclusion Determinations: Office of River Protection-Richland  

Broader source: Energy.gov (indexed) [DOE]

March 1, 2011 March 1, 2011 CX-005367: Categorical Exclusion Determination Project T-222 Hazardous Materials Management Emergency Response (HAMMER) Training Facility Water Main Extension for Fire Protection CX(s) Applied: B1.3, B1.15 Date: 03/01/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office March 1, 2011 CX-005366: Categorical Exclusion Determination Herbicide Applications Along Gravel and Paved Roads on the Hanford Site CX(s) Applied: B1.3 Date: 03/01/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office January 31, 2011 CX-005190: Categorical Exclusion Determination Project L-691, 200 West Area Sanitary Sewage Lagoon CX(s) Applied: B1.26 Date: 01/31/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office

118

Office of Headquarters Security Operations  

Broader source: Energy.gov [DOE]

The Office of Headquarters Security Operations strengthens national security by protecting personnel, facilities, property, classified information, and sensitive unclassified information for DOE Headquarters facilities in the National Capital Area under normal and abnormal (i.e., emergency) conditions; managing access authorization functions for Headquarters; ensuring that executives and dignitaries are fully protected, and supporting efforts to ensure the continuity of government in all circumstances as mandated by Presidential Decision Directive.

119

Independent Oversight Inspection, Savannah River Site Office - December  

Broader source: Energy.gov (indexed) [DOE]

Savannah River Site Office - Savannah River Site Office - December 2009 Independent Oversight Inspection, Savannah River Site Office - December 2009 December 2009 Inspection of Nuclear Safety at the Savannah River Site Office and the Tritium Program Facilities The U.S. Department of Energy (DOE) Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), conducted an inspection of nuclear safety at several National Nuclear Security Administration (NNSA) facilities located at DOE's Savannah River Site (SRS) during August and September 2009. The inspection was performed by the Office of Independent Oversight's Office of Environment, Safety and Health Evaluations. With some isolated exceptions, the current SRNS nuclear safety programs and processes at the Tritium Program facilities are effective. Facility and

120

Independent Activity Report, Office of River Protection Waste Treatment  

Broader source: Energy.gov (indexed) [DOE]

Office of River Protection Waste Office of River Protection Waste Treatment Plant and Tank Farms - February 2013 Independent Activity Report, Office of River Protection Waste Treatment Plant and Tank Farms - February 2013 February 2013 Site Familiarization and Introduction of New Office of Safety and Emergency Management Evaluations Site Lead for the Office of River Protection Waste Treatment Plant and Tank Farms [HIAR-HANFORD-2013-02-25] The Office of Health, Safety and Security's (HSS) Office of Safety and Emergency Management Evaluations (HS-45) assigned a new Site Lead to provide continuous oversight of activities at the Office of River Protection (ORP) Waste Treatment Plant (WTP) and tank farms. To gain familiarity with the site programs and personnel, the new Site Lead made two trips to the site, which included tours of the WTP construction site

Note: This page contains sample records for the topic "river operations office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Office of Headquarters Security Operations | Department of Energy  

Office of Environmental Management (EM)

Headquarters Security Operations Office of Headquarters Security Operations Mission The Office of Headquarters Security Operations strengthens national security by protecting...

122

CRAD, Emergency Management - Office of River Protection K Basin Sludge  

Broader source: Energy.gov (indexed) [DOE]

Office of River Protection K Basin Office of River Protection K Basin Sludge Waste System CRAD, Emergency Management - Office of River Protection K Basin Sludge Waste System May 2004 A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a May 2004 assessment of the Emergency Management program at the Office of River Protection K Basin Sludge Waste System. CRADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, Emergency Management - Office of River Protection K Basin Sludge Waste System More Documents & Publications CRAD, Engineering - Office of River Protection K Basin Sludge Waste System

123

Energy San Francisco Operations Office  

Office of Legacy Management (LM)

Depariment of ' Depariment of ' Energy San Francisco Operations Office 1333 Broadway Oakland, California 94612 FEB 6 1984 Mr. c:c. canners Energy Systems Group Rockwell International Corporation Post Office BOX 309 Canoga Park Dear 8 a CA 91304 G ers : Remedial action was taken to decontaminate the Hot Cave (Building 003) and Sodium Reactor Experiment (SRE) under Contract No. DE-AT03-76SF75008. The report of the post remedial survey, performed by Argonne National Laboratory, indicates that the levels of contamination are below the decontamination criteria agreed to between the State of California and DOE/SAN. Based on- this report and the enclosed letter from J. E. Baublitz to Dr. Wynveen, DOE/SAN is releasing for unrestricted use Building 003 and the SRE. Sincerely,

124

Chicago Operations Office: Technology summary  

SciTech Connect (OSTI)

This document has been prepared by the Department of Energy`s (DOE) Environmental Management (EM) Office of Technology Development (OTD) to highlight its research, development, demonstration, testing, and evaluation (RDDT and E) activities funded through the Chicago Operations Office. Technologies and processes described have the potential to enhance DOE`s cleanup and waste management efforts, as well as improve US Industry`s competitiveness in global environmental markets. The information has been assembled from recently produced OTD documents which highlight technology development activities within each of the OTD program elements. OTD technologies addresses three specific problem areas: (1) groundwater and soils cleanup; (2) waste retrieval and processing; and (3) pollution prevention. These problems are not unique to DOE, but are associated with other Federal agency and industry sites as well. Thus, technical solutions developed within OTD programs will benefit DOE, and should have direct applications in outside markets.

Not Available

1994-12-01T23:59:59.000Z

125

Independent Activity Report, Richland Operations Office - April...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Richland Operations Office - April 2011 April 2011 Operational Awareness Review of the Hanford Sludge Treatment Project HIAR-RL-2011-04-07 This Independent Activity Report...

126

Science Co-Operation Office, Middle East  

Science Journals Connector (OSTI)

... THE Science Co-operation ... Co-operation Office, Middle East, of Unesco, in Cairo publishes a list of the scientific papers ...

1949-02-12T23:59:59.000Z

127

Independent Activity Report, Hanford Operations Office - July...  

Broader source: Energy.gov (indexed) [DOE]

assessment included evaluation of work control, fall protection, quality assurance, and conduct of operations. Independent Activity Report, Hanford Operations Office - July 2010...

128

Categorical Exclusion Determinations: Idaho Operations Office | Department  

Broader source: Energy.gov (indexed) [DOE]

Idaho Operations Office Idaho Operations Office Categorical Exclusion Determinations: Idaho Operations Office Categorical Exclusion Determinations issued by Idaho Operations Office. DOCUMENTS AVAILABLE FOR DOWNLOAD July 11, 2013 CX-010699: Categorical Exclusion Determination North Boulevard Annex Lease Termination CX(s) Applied: B1.24 Date: 07/11/2013 Location(s): Idaho Offices(s): Idaho Operations Office July 11, 2013 CX-010698: Categorical Exclusion Determination Modeling and Validation of Sodium Plugging for Heat Exchangers in Sodium-cooled Fast Reactor Systems CX(s) Applied: B3.6 Date: 07/11/2013 Location(s): Illinois Offices(s): Idaho Operations Office June 25, 2013 CX-010701: Categorical Exclusion Determination Materials and Fuels Complex Diversion Dam CX(s) Applied: B2.5 Date: 06/25/2013

129

DOE - Office of Legacy Management -- Savannah River Swamp - SC...  

Office of Legacy Management (LM)

Savannah River Swamp - SC 01 FUSRAP Considered Sites Site: Savannah River Swamp (SC.01 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site...

130

Categorical Exclusion Determinations: Idaho Operations Office | Department  

Broader source: Energy.gov (indexed) [DOE]

January 25, 2011 January 25, 2011 CX-005187: Categorical Exclusion Determination Hex Block Shipment Project CX(s) Applied: B3.6 Date: 01/25/2011 Location(s): Idaho Office(s): Nuclear Energy, Idaho Operations Office January 5, 2011 CX-004926: Categorical Exclusion Determination Radioactive Waste Management Complex ? Analytical Laboratory Operations CX(s) Applied: B3.1 Date: 01/05/2011 Location(s): Idaho Office(s): Nuclear Energy, Idaho Operations Office December 10, 2010 CX-004645: Categorical Exclusion Determination CPP-663 Heating, Ventilation and Air Conditioning Systems Upgrade CX(s) Applied: B2.1 Date: 12/10/2010 Location(s): Idaho Office(s): Idaho Operations Office November 16, 2010 CX-004561: Categorical Exclusion Determination Idaho Nuclear Technology and Engineering Center - Light Water Breeder

131

Categorical Exclusion Determinations: Idaho Operations Office | Department  

Broader source: Energy.gov (indexed) [DOE]

March 15, 2010 March 15, 2010 CX-001231: Categorical Exclusion Determination Test Reactor Area-653 Heating, Ventilation, Air Conditioning Modifications CX(s) Applied: B2.1, B2.5 Date: 03/15/2010 Location(s): Idaho Office(s): Idaho Operations Office, Nuclear Energy March 15, 2010 CX-001230: Categorical Exclusion Determination Replace 200,000 Gallon Water Storage Tank at Material Fuels Complex CX(s) Applied: B1.15 Date: 03/15/2010 Location(s): Idaho Office(s): Idaho Operations Office, Nuclear Energy March 11, 2010 CX-001229: Categorical Exclusion Determination Characterization of Fluidized Beds by Pressure Fluctuation Analysis CX(s) Applied: B3.6 Date: 03/11/2010 Location(s): Idaho Office(s): Idaho Operations Office, Nuclear Energy February 23, 2010 CX-000865: Categorical Exclusion Determination

132

Independent Activity Report, Richland Operations Office - August...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

2011 Independent Activity Report, Richland Operations Office - August 2011 August 2011 Hanford Sludge Treatment Project HIAR-RL-2011-08-25 This Independent Activity Report...

133

Independent Activity Report, Richland Operations Office - April...  

Office of Environmental Management (EM)

April 2013 Operational Awareness of a Department of Energy Richland Operations Office Fire Protection Surveillance HIAR-RL-2013-04-08 The U.S. Department of Energy (DOE)...

134

Office of Security Operations: Headquarters Security Officers (HSO) Program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Headquarters Security Officers (HSO) Program Headquarters Security Officers (HSO) Program Responsible Individual/Contact: Wayne Berkebile - (301) 903-1163 - D-320 Scope: The Headquarters Security Officer (HSO) Program was established in 1990 by the Under Secretary of Energy in order to improve communications between the Office of Headquarters Security Operations and component organizations within DOE Headquarters. It is governed by DOE Headquarters Order 472.1, Headquarters Security Officer Program, dated 3-19-2010. Each Headquarters element is required to appoint at least one HSO and an Alternate HSO. HSOs perform a wide variety of security-related functions within their element such as obtaining security badges and clearances, maintaining Security Areas, acquiring security equipment, implementing procedures for protecting classified and sensitive information, conducting security inquiries, and arranging for required security services.

135

Contractor Fee Payments- Richland Operations Office  

Broader source: Energy.gov [DOE]

See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Richland Operations Office on these charts.

136

Office of Employee Development Operational Efficiency Project  

E-Print Network [OSTI]

Office of Employee Development Operational Efficiency Project Survey Summary from Supervisory Staff the University titled "Operational Efficiency Project." Its mandate was to gather information, evaluate current operations, review benchmarks and best practices, and develop organizational and/or cost saving alternatives

Huang, Jianyu

137

Idaho Operations Office | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Idaho Operations Idaho Operations Office Idaho Operations Office Idaho Operations Office INL combines the expertise of government, industry and academia in a single laboratory under the leadership of Battelle Energy Alliance (BEA), a team comprised of Battelle Memorial Institute, Washington Group International, BWXT Services, Inc., the Electric Power Research Institute and Massachusetts Institute of Technology. BEA manages the laboratory under a Management and Operating contract. This contract requires: Safe and efficient operation of all INL facilities. Cost reduction by better use of existing facilities and elimination of under-utilized or unneeded facilities. More cost effective accomplishment of mission objectives by use of upgraded and new infrastructure. The ongoing effort needed to maintain federal facilities and infrastructure

138

Independent Activity Report, Richland Operations Office - April 2013 |  

Broader source: Energy.gov (indexed) [DOE]

3 3 Independent Activity Report, Richland Operations Office - April 2013 April 2013 Operational Awareness of a Department of Energy Richland Operations Office Fire Protection Surveillance [HIAR-RL-2013-04-08] The U.S. Department of Energy (DOE) Office of Enforcement and Oversight, within the Office of Health, Safety and Security (HSS), performed an onsite operational awareness review of a DOE Richland Operations Office (DOE-RL) fire protection surveillance. Independent Activity Report, Richland Operations Office - April 2013 More Documents & Publications Independent Activity Report, Richland Operations Office - April 2011 Independent Activity Report, Hanford Sludge Treatment Project - February 2012 Independent Activity Report, Richland Operations Office - June 201

139

Oak Ridge Operations Office of Environmental Management Overview...  

Broader source: Energy.gov (indexed) [DOE]

of Environmental Management Overview Oak Ridge Operations Office of Environmental Management Overview Oak Ridge Operations Office of Environmental Management Overview More...

140

Employee Job Task Analysis (EJTA) PIA, Richland Operations Office...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Employee Job Task Analysis (EJTA) PIA, Richland Operations Office Employee Job Task Analysis (EJTA) PIA, Richland Operations Office Employee Job Task Analysis (EJTA) PIA, Richland...

Note: This page contains sample records for the topic "river operations office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Office of River Protection Looks Back on 2014 Achievements, Including Tank Retrieval Progress  

Broader source: Energy.gov [DOE]

RICHLAND, Wash. In 2014, EMs Office of River Protection (ORP) marked several accomplishments at the Hanford site, including continuing efforts to resolve remaining technical issues with the Waste Treatment and Immobilization Plant (WTP); restarting operations of the 242-A Evaporator; establishing waste acceptance limits for WTP; and continuing progress in waste tank retrievals.

142

Oversight Scheduling and Operational Awareness at the Savannah River Site, March 2013  

Broader source: Energy.gov (indexed) [DOE]

HSS Independent Activity Report - HSS Independent Activity Report - Rev. 0 Report Number: HIAR-SRS-2013-03-25 Site: Savannah River Site Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report on Oversight Scheduling and Operational Awareness at the Savannah River Site Dates of Activity : 03/25/2013 - 03/28/2013 Report Preparer: Phillip D. Aiken Activity Description/Purpose: 1. The Independent Oversight Site Lead for the Savannah River Site traveled to the site to work with functional area managers to schedule nuclear safety oversight activities. 2. The Site Lead reviewed the differing professional opinion (DPO) program at the Savannah River Operations Office (Department of Energy (DOE)-SR). Result: 1. The Site Lead scheduled a radiological program review at the National Nuclear Security Administration Savannah River

143

Categorical Exclusion Determinations: Idaho Operations Office | Department  

Broader source: Energy.gov (indexed) [DOE]

November 28, 2011 November 28, 2011 CX-007774: Categorical Exclusion Determination Rensselaer Infrastructure Upgrade to Enhance Research and Education in Nuclear Engineering - Rensselaer Polytechnic Institute CX(s) Applied: B3.6 Date: 11/28/2011 Location(s): New York Offices(s): Nuclear Energy, Idaho Operations Office November 28, 2011 CX-007773: Categorical Exclusion Determination An Integrated Upgrade of Scientific Equipment for Strengthening the Research and Education in Nuclear Energy at the Ohio State University CX(s) Applied: B1.2, B3.6 Date: 11/28/2011 Location(s): Ohio Offices(s): Nuclear Energy, Idaho Operations Office November 28, 2011 CX-007772: Categorical Exclusion Determination Idaho National Laboratory Asphalt Repair Project - North Wind Services, LLC CX(s) Applied: B1.3

144

Categorical Exclusion Determinations: Idaho Operations Office | Department  

Broader source: Energy.gov (indexed) [DOE]

May 22, 2012 May 22, 2012 CX-008744: Categorical Exclusion Determination Implementation of a Low-Level Gamma-Ray Counting Facility - University of Texas at Austin CX(s) Applied: B3.6 Date: 05/22/2012 Location(s): Idaho Offices(s): Idaho Operations Office May 22, 2012 CX-008738: Categorical Exclusion Determination Determination of Microstructure and Chemical State Changes in Ion-Irradiated Fuels and Structural Components with a High Kinetic Energy Electron Detector - Illinois Institute of Technology CX(s) Applied: B3.6 Date: 05/22/2012 Location(s): Idaho Offices(s): Idaho Operations Office May 22, 2012 CX-008737: Categorical Exclusion Determination Building Calorimetric and Thermogravimetric Analytical Instrumentation Capability at Oregon State University CX(s) Applied: B3.6 Date: 05/22/2012

145

Chief Operating Officer Joe Bengfort  

E-Print Network [OSTI]

Virtualization Engineer Jason Braatz Virtualization Engineer Dong Tran Sr. Intel/Citrix Systems Engineer Mark/Citrix Systems Engineer Hossain Bayat Sr. Desktop Systems Engineer Christopher Hester Desktop Systems Engineer Karen O'Neill Director ­ IT Operations Mark Uchi Field Services Manager Michael Fernandez FS Technical

Yamamoto, Keith

146

Chief Operating Officer Joe Bengfort  

E-Print Network [OSTI]

Engineer Jason Braatz Virtualization Engineer Dong Tran Sr. Intel/Citrix Systems Engineer Mark Sorbi Sr/Citrix Systems Engineer Hossain Bayat Sr. Desktop Systems Engineer Christopher Hester Desktop Systems Engineer'Neill Director ­ IT Operations Mark Uchi Field Services Manager Michael Fernandez FS Technical Lead Vacant FS

Derisi, Joseph

147

Office of Headquarters Personnel Security Operations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Headquarters Personnel Headquarters Personnel Director's Perspective Welcome to the Office of Headquarters Personnel Security Operations Stephanie Scott Grimes, Director The Office of Headquarters Personnel Security Operations serves the Department by providing a comprehensive Personnel Security Program for the DOE Headquarters complex. Our goal is to ensure that DOE classified information and materials are safeguarded from compromise by assuring that only trustworthy individuals are granted security clearances. This is accomplished through conscientious, just, and thoughtful application of Federal rules and statutes aimed at ensuring only individuals whose character, associations, and loyalty do not endanger the common defense are granted access to DOE classified information and materials.

148

Facility Operations Office, Brookhaven National Laboratory, BNL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Facility Operations Office Facility Operations Office Safely supporting the missions of the laboratory... The Facility Operations Office addresses key issues in work planning, maintenance engineering, service-delivery models, and annual facility-work plans. Facility Operations Center: The Facility Operations Center provides computer programs designed to assist in the planning, management and administrative procedures required for an effective maintenance and asset management process. As an information technology tool for managing the maintenance process, a Computerized Maintenance Management System (CMMS) is a mission-essential part of any organization, and a tool for success. Infrastructure Management: IM's goal is to ensure Brookhaven National Laboratory real property assets are planned for, managed, tracked, and upgraded as required in order to meet BNL's current and future programmatic needs. To accomplish this IM performs site and utilities master planning, manages BNL's new project request and prioritization system (3PBP), maintains utilities maps, manages BNL's space and facilities data base, and provides program management for BNL's GPP, Line Item and Operating Funded Project programs.

149

Independent Activity Report, Richland Operations Office - June 2011 |  

Broader source: Energy.gov (indexed) [DOE]

June 2011 June 2011 Independent Activity Report, Richland Operations Office - June 2011 June 2011 Hanford Cold Vacuum Drying Facility, Multi-Canister Overpack, Operational Proficiency Demonstration [HIAR-RL-2011-06-22] The U.S. Department of Energy's (DOE) Office of Enforcement and Oversight, within the Office of Health, Safety and Security (HSS), performed an operational awareness review of the Cold Vacuum Drying Facility, Multi-Canister Overpack, Operational Proficiency Demonstration. Independent Activity Report, Richland Operations Office - June 2011 More Documents & Publications Independent Oversight Review, Hanford K Basin and Cold Vacuum Drying Facility - August 2012 Independent Activity Report, Richland Operations Office - January 2011 Independent Activity Report, Richland Operations Office - June 2011

150

Office of Security Operations: Mission and Functions  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Mission and Functions Mission and Functions Mission The Office of Headquarters Security Operations strengthens national security by protecting personnel, facilities, property, classified information, and sensitive unclassified information for DOE Headquarters facilities in the National Capital Area under normal and abnormal (i.e., emergency) conditions; managing access authorization functions; ensuring that executives and dignitaries are fully protected, and supporting efforts to ensure the continuity of government in all circumstances as mandated by Presidential Decision Directive. The Office is the database owner for the principal personnel security information processing activities of the Department and personnel security administrative review process. Functions

151

Chicago Operations Office 9800 South Cass Avenue  

Office of Legacy Management (LM)

Office Office 9800 South Cass Avenue Argonne,, Illinois 60439 James L. Liver-man, Acting Assistant Secretary for Environment, HQ THE DOW CHEMICAL COMPANY On December 8, 1977, Edward J. Jascewsky, Department of Energy (DOE), and Walter Smith, Argonne National Laboratory (ANL), visited The Dow Chemical Company, Walnut'Creek, California. The purpose of the visit was to discuss the past operations at these facilities under Atomic Energy Commission (AEC), Contract AT (40-l)-GEN 236, which involved process studies on different uranium ores. Discussions were held with Dr. Charles Levine, Radiation Safety Officer. He identified four rooms (j/l, 2, 18, and 25) in the Research Building that were used during the period of the contract. A survey of the facility was performed by Messrs. Jascewsky and Smith.

152

EVG USAIX, Svergreen chalk River Liaison Office Ontario, Canada  

Office of Legacy Management (LM)

and Special Nuc.lear and Special Nuc.lear ?kk?rials kcc+ntabilitg EVG USAIX, Svergreen chalk River Liaison Office Ontario, Canada iulff USAEC, Washington Office See Div. of Rak Materials c~!:KRGO O?ER.i~TIONS ---.-- :ri:i!k USAZC, Ctricago Opnrations Office AGT General Electric Company AN? Project A.J,I Argonne Nat'1 Lab. AYL Al-tonne Nat'1 Lab. B XI Battelle Xfemorial Inst. CKX Vi.l;ro Carp, of America Em USAEC, East Hartford Area a TSC Ioxa State College ITS General Electric Company ANP Jk!pt, -%IAO IJSAK;, Lo&land Area Office . George L. ldercer P. 0. Box 59 Lemont, .Illinois P. 0. Box 132 Cincinnati 15, Ohio P. 0. Box 1096 Idaho Falls, Idaho P. 0. Box 299 -Lemont, Illinois 505 King Ave, Columbus, Ohio J. J. Uawning Lemont 800 bxt. 20~3 . . . . B. J. Sevold

153

DOE/EIS-0236, Oakland Operations Office, National Ignition Facility...  

Energy Savers [EERE]

DOEEIS-0236, Oakland Operations Office, National Ignition Facility Final Supplemental Environmental Impact Statement to the Stockpile Stewardship and Management Programmatic...

154

Independent Activity Report, Richland Operations Office - June 2011 |  

Broader source: Energy.gov (indexed) [DOE]

June 2011 June 2011 Independent Activity Report, Richland Operations Office - June 2011 June 2011 Hanford Cold Vacuum Drying Facility, Multi-Canister Overpack, Operational Proficiency Demonstration [HIAR-RL-2011-06-22] The U.S. Department of Energy's (DOE) Office of Enforcement and Oversight, within the Office of Health, Safety and Security (HSS), performed an operational awareness review of the Cold Vacuum Drying Facility, Multi-Canister Overpack, Operational Proficiency Demonstration. Independent Activity Report, Richland Operations Office - June 2011 More Documents & Publications Independent Oversight Review, Hanford K Basin and Cold Vacuum Drying Facility - August 2012 Independent Activity Report, Hanford Sludge Treatment Project - February 2012 Independent Activity Report, Richland Operations Office - June

155

Independent Activity Report, Richland Operations Office - June 2011 |  

Broader source: Energy.gov (indexed) [DOE]

Independent Activity Report, Richland Operations Office - June 2011 Independent Activity Report, Richland Operations Office - June 2011 Independent Activity Report, Richland Operations Office - June 2011 June 2011 Hanford Sludge Treatment Project Review [HIAR-RL-2011-06-17] The U.S. Department of Energy's (DOE) Office of Enforcement and Oversight, within the Office of Health, Safety and Security (HSS), performed operational awareness reviews of the Sludge Treatment Project (STP), Engineered Container Retrieval and Transfer System (ECRTS) during site visits. Independent Activity Report, Richland Operations Office - June 2011 More Documents & Publications Independent Activity Report, Richland Operations Office - April 2011 Independent Activity Report, Hanford Sludge Treatment Project - February 2012 Independent Activity Report, Richland Operations Office - August 2011

156

Independent Oversight Review, Richland Operations Office - November 2012 |  

Broader source: Energy.gov (indexed) [DOE]

Richland Operations Office - November Richland Operations Office - November 2012 Independent Oversight Review, Richland Operations Office - November 2012 November 2012 Review of the Richland Operations Office Oversight of Implementation Verification Review Processes This report documents the independent review of implementation verification review (IVR) processes at the Richland Operations Office (DOE-RL) conducted by the Office of Enforcement and Oversight (Independent Oversight), which is within the U.S. Department of Energy's (DOE) Office of Health, Safety and Security (HSS). The onsite review was performed by the HSS Office of Safety and Emergency Management Evaluations from August 13 to 17, 2012. The objective of this assessment was to evaluate the extent to which the DOE-RL has developed and employed appropriate methods for oversight of contractor

157

Chicago Operations Office 9800 South Cass Avenue  

Office of Legacy Management (LM)

y,: y; , i y,: y; , i 4- 1 .' f?Qj /J < b !. i-. .* ;+ ,.- Department of Energy Chicago Operations Office 9800 South Cass Avenue Argonne, Illinois 60439 : / *- I (jr-. _ __-rCILC-. .-WI __ James L. Liverman, Acting Assistant Secretary for Environment, HQ UNIVERSITY OF ARIZONA On January 17, 1978, Edward J. Jascewsky, Department of Energy (DOE), and Walter H. Smith, Argonne National Laboratory (AX), visited the University of Arizona. The purpose of the visit teas to discuss the past operations of c$rtain facilities that were previcusly used by the Bureau of Mines for the Atomic Energy Coxission xork. Enclosed are three drawings showing the location of these facilities. The Bureau of Mines activities have been closed down for abour fifteen years, and the property of concern is now owned by the L'niversiry of

158

CRAD, Occupational Safety & Health - Office of River Protection K Basin  

Broader source: Energy.gov (indexed) [DOE]

Office of River Protection K Office of River Protection K Basin Sludge Waste System CRAD, Occupational Safety & Health - Office of River Protection K Basin Sludge Waste System May 2004 A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a May 2004 assessment of the Environment, Safety and Health program at the Office of River Protection K Basin Sludge Waste System. CRADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, Occupational Safety & Health - Office of River Protection K Basin Sludge Waste System More Documents & Publications CRAD, Management - Office of River Protection K Basin Sludge Waste System

159

CRAD, Training - Office of River Protection K Basin Sludge Waste System |  

Broader source: Energy.gov (indexed) [DOE]

Office of River Protection K Basin Sludge Waste Office of River Protection K Basin Sludge Waste System CRAD, Training - Office of River Protection K Basin Sludge Waste System May 2004 A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a May 2004 assessment of the Environment, Safety and Health program at the Office of River Protection K Basin Sludge Waste System. CRADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, Training - Office of River Protection K Basin Sludge Waste System More Documents & Publications CRAD, Emergency Management - Office of River Protection K Basin Sludge

160

CRAD, Engineering - Office of River Protection K Basin Sludge Waste System  

Broader source: Energy.gov (indexed) [DOE]

Engineering - Office of River Protection K Basin Sludge Waste Engineering - Office of River Protection K Basin Sludge Waste System CRAD, Engineering - Office of River Protection K Basin Sludge Waste System May 2004 A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a May 2004 assessment of the Engineering program at the Office of River Protection K Basin Sludge Waste System. CRADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, Engineering - Office of River Protection K Basin Sludge Waste System More Documents & Publications CRAD, Emergency Management - Office of River Protection K Basin Sludge

Note: This page contains sample records for the topic "river operations office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Independent Activity Report, Office of River Protection Waste Treatment Plant and Tank Farms- February 2013  

Broader source: Energy.gov [DOE]

Site Familiarization and Introduction of New Office of Safety and Emergency Management Evaluations Site Lead for the Office of River Protection Waste Treatment Plant and Tank Farms [HIAR-HANFORD-2013-02-25

162

Cleaning Up the Hanford River Corridor and Improving Site Operations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

operations * Continue River Corridor cleanup, including remediation of 618-10 Burial Ground * Continue Plutonium Finishing Plant deactivation, decommissioning and demolition *...

163

Dennis Yates Of Savannah River Operations Named 2013 Facility...  

Office of Environmental Management (EM)

River Site. The HB-Line is part of the H-Canyon, which conducts hazardous nuclear chemistry, packaging, and processing operations on plutonium and transuranic materials. Mr....

164

Type B Accident Investigation Board Report of the Plutonium Intake between August 4, 1996, and February 10, 1997, by a Crane Operator at the Savannah River Site F-Canyon  

Broader source: Energy.gov [DOE]

This report is an independent product of an accident investigation board appointed by Dr. Mario P. Fiori, Manager, Savannah River Operations Office, U.S. Department of Energy.

165

Office of Headquarters Personnel Security Operations: Mission and Functions  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Office of Executive Protection Office of Executive Protection Home Sub Offices › HQ Security Officers (HSO) Program › Office of Security OperationsOffice of Information Security › Office of Headquarters Personnel › Office of Physical Protection › Office of Security Operations Mission & Functions › Security Operations › HQ Security Operations › HQ Personnel Security Op. › Special Operations HSO Program - 2010 Spotlights - 2009 Spotlights - Spotlights Archives (2008-2007) HSO Contacts Contact Us Headquarters Facilities Master Security Plan Security Reference Book HSS Logo Office of Headquarters Personnel Security Operations Reports to the Office of Security Operations Mission and Functions Mission Provide a comprehensive Personnel Security Program for the DOE Headquarters complex. Ensure that DOE classified information, materials, buildings and information systems are safeguarded from compromise by only granting security clearances and building access to trustworthy individuals. This is accomplished through conscientious, just, and thoughtful application of Federal rules and statutes with the goal of ensuring that only individuals whose character, associations, and loyalty do not endanger the common defense are granted access to DOE classified information, materials, buildings and information systems.

166

Oak Ridge Operations Office (ORO) & Wastren Advantage, Inc. (WAI)  

Broader source: Energy.gov (indexed) [DOE]

Ridge Operations Office (ORO) & Wastren Advantage, Inc. (WAI) Ridge Operations Office (ORO) & Wastren Advantage, Inc. (WAI) Partnering Agreement For The Transuranic Waste Processing Program Oak Ridge Operations Office (ORO) & Wastren Advantage, Inc. (WAI) Partnering Agreement For The Transuranic Waste Processing Program The Transuranic (TRU) Waste Partnering Team will be viewed as a virtual High-Performing Organization that is widely recognized for exceeding expectations through innovative technical and management strategies, and whose commitment to its employees, the EM Mission, and the stewardship of the Oak Ridge Site are its highest priorities. Oak Ridge Operations Office (ORO) & Wastren Advantage, Inc. (WAI) Partnering Agreement For The Transuranic Waste Processing Program More Documents & Publications

167

2011 Annual Planning Summary for Idaho Operations Office (ID)  

Broader source: Energy.gov [DOE]

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Idaho Operations Office (ID) (See Environmental Management).

168

2011 Annual Planning Summary for Chicago Operations Office (CH)  

Broader source: Energy.gov [DOE]

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Chicago Operations Office (CH) (See Science APS).

169

Independent Activity Report, Hanford Operations Office - July 2010 |  

Broader source: Energy.gov (indexed) [DOE]

Independent Activity Report, Hanford Operations Office - July 2010 Independent Activity Report, Hanford Operations Office - July 2010 Independent Activity Report, Hanford Operations Office - July 2010 July 2010 Joint Assessment of the Effectiveness of Corrective Actions for the Building 336 Accident The U.S. Department of Energy, Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), and the Richland Operations Office (RL) performed a joint effectiveness assessment of the corrective actions taken by Washington Closure Hanford, LLC (WCH) in response to the Building 336 Fall Event. The review was conducted from July 12-21, 2010, by a team consisting of four HSS and six RL personnel. The scope of the assessment included evaluation of work control, fall protection, quality assurance, and conduct of operations.

170

Independent Activity Report, Savannah River Remediation - July...  

Broader source: Energy.gov (indexed) [DOE]

Remediation - July 2010 Independent Activity Report, Savannah River Remediation - July 2010 July 2010 Savannah River Operations Office Integrated Safety Management System Phase II...

171

Independent Activity Report, Richland Operations Office - January 2011 |  

Broader source: Energy.gov (indexed) [DOE]

Independent Activity Report, Richland Operations Office - January Independent Activity Report, Richland Operations Office - January 2011 Independent Activity Report, Richland Operations Office - January 2011 January 2011 Presentation of Questions Associated With the Safety Analysis Report for Packaging (Onsite) Multi-Canister Overpack Cask [ARPT-RL-2011-001] The U.S. Department of Energy (DOE) Office of Independent Oversight, within the Office of Health, Safety and Security, during a site visit from January 10-14, 2011, presented the results of a technical review of the Safety Analysis Report (SAR) for Packaging (Onsite) Multi-Canister Overpack (MCO) Cask HNF-SD-SARP-017, Rev. 3, to DOE Richland Operations Office (RL) representatives. The presentation was supported by a detailed document that discussed the individual questions.

172

Office of River Protection (RPP) Interface Management in the Multi Contract Project Environment at Hanford  

SciTech Connect (OSTI)

The Office of River Protection (ORP) is implementing the River Protection Project (RPP) using two prime contractors. CH2M Hill Hanford Group, Inc. (CHG) is responsible for operating the existing tank system, delivering the waste feed to the waste treatment plant, and managing the resulting low- and high-level glass waste ''product'' through a performance-based fee type contract. A separate prime contractor will be responsible for designing, constructing and commissioning of a new Waste Treatment and Immobilization Plant (WTP), and preparing the waste for ultimate disposal. In addition to the prime contractors and their interfaces, the River Protection Project is being conducted on the Hanford Site, which is under the management of another DOE organization, DOE Richland Field Office (DOE-RL). The infrastructure and utilities are provided by DOE-RL, for example. In addition, there are multiple other technical interfaces with federal, state and other regulatory agencies that influence the management of the activities. This paper provides an overview of the approach employed by ORP to identify, coordinate, and manage the technical interfaces of RPP. In addition, this paper describes the approach and methodologies used to: Establish an overall framework for interface management. Establish the requirements for defining and managing interfaces for the prime contractors and DOE. Contractually requiring the prime contractors to control and manage the interfaces.

SHIKASHIO, L.A.

2000-09-22T23:59:59.000Z

173

Independent Oversight Review, Richland Operations Office - November 2012 |  

Broader source: Energy.gov (indexed) [DOE]

- November - November 2012 Independent Oversight Review, Richland Operations Office - November 2012 November 2012 Review of the Richland Operations Office Oversight of Implementation Verification Review Processes This report documents the independent review of implementation verification review (IVR) processes at the Richland Operations Office (DOE-RL) conducted by the Office of Enforcement and Oversight (Independent Oversight), which is within the U.S. Department of Energy's (DOE) Office of Health, Safety and Security (HSS). The onsite review was performed by the HSS Office of Safety and Emergency Management Evaluations from August 13 to 17, 2012. The objective of this assessment was to evaluate the extent to which the DOE-RL has developed and employed appropriate methods for oversight of contractor

174

Panel judges science office operation okay  

Science Journals Connector (OSTI)

A handful of members of a House subcommittee last week laid out the White House Office of Science & Technology Policy for diagnosis. After four hours of poking and jabbing by members and witnesses, OSTP was essentially pronounced good enough, considering. ...

WIL LEPKOWSKI

1988-02-22T23:59:59.000Z

175

Subcontracting Practices at the Nevada Operations Office and Its Management and Operating Contractor, WR-B-96-07  

Broader source: Energy.gov (indexed) [DOE]

DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY OFFICE OF INSPECTOR GENERAL SUBCONTRACTING PRACTICES AT THE NEVADA OPERATIONS OFFICE AND ITS MANAGEMENT AND OPERATING CONTRACTOR

176

Columbia River System Operation Review on Selecting an Operating Strategy for the Federal Columbia River Power System; 21Feb1997  

Broader source: Energy.gov (indexed) [DOE]

DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Bonneville Power Administration Columbia River System Operation Review on Selecting an Operating Strategy for the Federal Columbia River Power System (FCRPS) AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE) ACTION: Record of Decision (ROD) SUMMARY: The Columbia River System Operation Review (SOR) Environmental Impact Statement (EIS) assessed operations at the 14 Federal dams and reservoirs on the Columbia and lower Snake Rivers that have a major influence on the multiple purpose system operation, and for which power production is coordinated under the Pacific Northwest Coordination Agreement. Lead agencies for this six-year process were the U.S. Army Corps of Engineers (Corps), the U.S. Bureau of Reclamation

177

Office of Headquarters Security Operations | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Headquarters Security Headquarters Security Operations Office of Headquarters Security Operations Mission The Office of Headquarters Security Operations strengthens national security by protecting personnel, facilities, property, classified information, and sensitive unclassified information for DOE Headquarters facilities in the National Capital Area under normal and abnormal (i.e., emergency) conditions; managing access authorization functions; ensuring that executives and dignitaries are fully protected, and supporting efforts to ensure the continuity of government in all circumstances as mandated by Presidential Decision Directive. The Office is the database owner for the principal personnel security information processing activities of the Department and personnel security administrative review process.

178

Ventilation System to Improve Savannah River Site's Liquid Waste Operations  

Broader source: Energy.gov [DOE]

AIKEN, S.C. The EM program and its liquid waste contractor at the Savannah River Site are improving salt waste disposition work and preparing for eventual operations of the Salt Waste Processing Facility (SWPF) currently being constructed.

179

John C. Barnes of Savannah River Operations named 2012 Facility...  

Broader source: Energy.gov (indexed) [DOE]

the Savannah River Site, including the F and H-Canyons and the HB-Line. These facilities conduct hazardous nuclear chemistry, packaging, and processing operations on plutonium and...

180

EIS-0170: Columbia River System Operation Review, BPA Area  

Broader source: Energy.gov [DOE]

The Columbia River System Operation Review Final Environmental Impact Statement (EIS) evaluates the potential impacts of four alternatives that represent the likely range of allocations between the Federal and non-Federal projects.

Note: This page contains sample records for the topic "river operations office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Operational Awareness Rerview of a Department of Energy Richland Operations Office Fire Protection Surveillance, April 2013  

Broader source: Energy.gov (indexed) [DOE]

HIAR-RL-2013-04-08 HIAR-RL-2013-04-08 Site: DOE-Richland Operations Office Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for the Department of Energy Richland Operations Office Fire Protection Surveillance Dates of Activity : 04/08/2013 - 04/11/2013 Report Preparer: Jake Wechselberger Activity Description/Purpose: The U.S. Department of Energy (DOE) Office of Enforcement and Oversight, within the Office of Health, Safety and Security (HSS), performed an onsite operational awareness review of a DOE Richland Operations Office (DOE-RL) fire protection surveillance. Result: During the period April 8-11, 2013, an HSS representative participated in DOE-RL tours of various site facilities to review

182

Operational Awareness Rerview of a Department of Energy Richland Operations Office Fire Protection Surveillance, April 2013  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

HIAR-RL-2013-04-08 HIAR-RL-2013-04-08 Site: DOE-Richland Operations Office Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for the Department of Energy Richland Operations Office Fire Protection Surveillance Dates of Activity : 04/08/2013 - 04/11/2013 Report Preparer: Jake Wechselberger Activity Description/Purpose: The U.S. Department of Energy (DOE) Office of Enforcement and Oversight, within the Office of Health, Safety and Security (HSS), performed an onsite operational awareness review of a DOE Richland Operations Office (DOE-RL) fire protection surveillance. Result: During the period April 8-11, 2013, an HSS representative participated in DOE-RL tours of various site facilities to review

183

Independent Activity Report, Richland Operations Office - April 2011 |  

Broader source: Energy.gov (indexed) [DOE]

1 1 Independent Activity Report, Richland Operations Office - April 2011 April 2011 Operational Awareness Review of the Hanford Sludge Treatment Project [HIAR-RL-2011-04-07] The U.S. Department of Energy's Office of Enforcement and Oversight, within the Office of Health, Safety and Security (HSS), performed operational awareness reviews of the Sludge Treatment Project (STP), Engineered Container Retrieval and Transfer System (ECRTS) during site visits. On November 17, 2010, a HSS representative participated in a tour of the STP test facility. The HSS representative was also briefed by the Department of Energy Richland Operations Office (DOE-RL) Project Engineer, the CHPRC STP Design Manager, and the DOE-RL principal support contract engineer. The HSS representative walked down the major components of the

184

IDAHO OPERATIONS OFFICE NAMES NEW IDAHO CLEANUP PROJECT MANAGER |  

Broader source: Energy.gov (indexed) [DOE]

IDAHO OPERATIONS OFFICE NAMES NEW IDAHO CLEANUP PROJECT MANAGER IDAHO OPERATIONS OFFICE NAMES NEW IDAHO CLEANUP PROJECT MANAGER IDAHO OPERATIONS OFFICE NAMES NEW IDAHO CLEANUP PROJECT MANAGER June 29, 2011 - 12:00pm Addthis Media Contact Brad Bugger (208) 526-0833 Idaho Falls, ID - The Department of Energy Idaho Operations Office today announced that James Cooper has been named deputy manager of its highly-successful Idaho Cleanup Project, which oversees the environmental cleanup and waste management mission at DOE's Idaho site. Cooper has more than 30 years of experience in commercial and government engineering and management, including an eight month stint as acting Deputy Manager for EM. He has extensive experience in business management associated with program planning, development and administration. His experience includes all project phases from conceptual planning, cost and

185

EM's Richland Operations Office Celebrates Disposal Achievement in 2013 |  

Broader source: Energy.gov (indexed) [DOE]

EM's Richland Operations Office Celebrates Disposal Achievement EM's Richland Operations Office Celebrates Disposal Achievement in 2013 EM's Richland Operations Office Celebrates Disposal Achievement in 2013 December 24, 2013 - 12:00pm Addthis Workers sample a well used to monitor groundwater at the Hanford site. Workers sample a well used to monitor groundwater at the Hanford site. Workers separate a glove box for removal from Hanford’s Plutonium Finishing Plant. Workers separate a glove box for removal from Hanford's Plutonium Finishing Plant. Workers sample a well used to monitor groundwater at the Hanford site. Workers separate a glove box for removal from Hanford's Plutonium Finishing Plant. RICHLAND, Wash. - EM's Richland Operations Office's 2013 accomplishments ranged from cleaning up buildings and waste sites to treating a record

186

Oak Ridge Operations Office (ORO) & Wastren Advantage, Inc. ...  

Office of Environmental Management (EM)

1 o FaCility Representative Fred Heacker Director, Waste Programs, TWPC April 2011 1 of 5 OAK RIDGE OPERATIONS OFFICE (ORO) & WASTREN ADVANTAGE, INC. (WAI) WI PARTNERING AGREEMENT...

187

OFFICE OF FACILITIES ENGINEERING AND OPERATIONS Strategic and  

E-Print Network [OSTI]

Engineering Museum Support Services Bruce Kendall Director Sheryl Kolasinski DD/CoS Facilities Master Planning Management Engineering &Design Management Technical Services Fire Protection Occupational Safety OccupationalOFFICE OF FACILITIES ENGINEERING AND OPERATIONS Strategic and Administrative Management Julie

Mathis, Wayne N.

188

DOE Office of Science Computing Facility Operational Assessment...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Physics Lab NUG Meeting, 17 Sep 2007 Objective * The DOE Office of Science is required to conduct an Operational Assessment (OA) Review of the efficiencies in the steady-state...

189

Ms. Victoria A. White Chief Operating Officer Fermilab  

Broader source: Energy.gov (indexed) [DOE]

Ms. Victoria A. White Chief Operating Officer Fermilab P.O. Box 500 Batavia, I L 60510 Dear Ms. White: SUBJECT : NATIONA L ENVIRON MENTAL POLICY ACT DETERMI NATION AT FERMI...

190

Ms. Victoria A, White Chief Operating Officer Fermilab  

Broader source: Energy.gov (indexed) [DOE]

A, White Chief Operating Officer Fermilab P.O. Box 50Q Batavia, I L 60510 Dear Ms. White: SUBJECT: NATIONAL ENVIRONMEN TAL POLICY ACT DTRMINATI QN AT ERMs NATIONAL ACCELERATO R...

191

DOE Selects Washington River Protection Solutions, LLC for Tank Operations  

Broader source: Energy.gov (indexed) [DOE]

DOE Selects Washington River Protection Solutions, LLC for Tank DOE Selects Washington River Protection Solutions, LLC for Tank Operations Contract at Hanford Site DOE Selects Washington River Protection Solutions, LLC for Tank Operations Contract at Hanford Site May 29, 2008 - 12:51pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that Washington River Protection Solutions (WRPS), LLC has been selected as the tank operations contractor to store, retrieve and treat Hanford tank waste and close the tank farms at DOE's Hanford Site in southeastern Washington State. The contract is a cost-plus award-fee contract valued at approximately $7.1 billion over ten years (a five-year base period with options to extend it for up to five years). WRPS is a limited liability company comprised of Washington Group

192

DOE Selects Washington River Protection Solutions, LLC for Tank Operations  

Broader source: Energy.gov (indexed) [DOE]

Selects Washington River Protection Solutions, LLC for Tank Selects Washington River Protection Solutions, LLC for Tank Operations Contract at Hanford Site DOE Selects Washington River Protection Solutions, LLC for Tank Operations Contract at Hanford Site May 29, 2008 - 12:51pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that Washington River Protection Solutions (WRPS), LLC has been selected as the tank operations contractor to store, retrieve and treat Hanford tank waste and close the tank farms at DOE's Hanford Site in southeastern Washington State. The contract is a cost-plus award-fee contract valued at approximately $7.1 billion over ten years (a five-year base period with options to extend it for up to five years). WRPS is a limited liability company comprised of Washington Group

193

Office of Administrative Operations (GC-90)  

Broader source: Energy.gov [DOE]

John D. (Dan) Bullington, Director of Administrative Operations 202-586-7364dan.bullington@hq.doe.gov

194

Office of River Protection Waste Treatment and Immobilizatin Project Construction Site, Nov. 16-18, 2010  

Broader source: Energy.gov (indexed) [DOE]

Tour and Review of the Office of River Tour and Review of the Office of River Protection Waste Treatment and Immobilization Project Construction Site, November 16-18, 2010 The U.S. Department of Energy Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), conducted an orientation visit on November 16-18, 2010, at the Office of River Protection Waste Treatment Immobilization Project (WTP) at the Department of Energy (DOE) Hanford Site. The purposes of the visit were to plan and coordinate future HSS oversight activities and to review corrective actions to the most recent HSS review at WTP. The WTP is an industrial complex for separating and vitrifying millions of gallons of radioactive and chemical waste stored at the Hanford site. The WTP complex consists of five major

195

Independent Activity Report, Richland Operations Office - June...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

June 20-22, 2011, at the Cold Vacuum Drying Facility at the Department of Energy's Hanford Site. The activity consisted of observing an operational assessment of the facility's...

196

Office of Safety Training Operations - Mission and Functions  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Safety Training Operations Safety Training Operations The Office of Safety Training Operations supports the mission of the National Training Center (NTC) by providing competency-based safety training for professionals within the Department necessary to maintain the technical qualifications and professional skill base. Safety Training Operations offers training in the competencies outlined in the Technical Qualification Program Functional Area Qualification Standards. Please click on this link to go to the National Training Center. Mission The mission of the Office of Safety Training Operations is to develop and deliver safety training courses to ensure the technical proficiency necessary to maintain a qualified workforce within the Department of Energy (DOE)/National Nuclear Security Administration (NNSA). Safety Training Operations assists in maintaining the proficiency of the DOE/NNSA safety personnel through standardized safety training, education, and professional development services at the National Training Center.

197

EIS-0351: Operation of Flaming Gorge Dam, Colorado River Storage Project, Colorado River, UT  

Broader source: Energy.gov [DOE]

The Secretary of the United States Department of the Interior (Secretary), acting through the Bureau of Reclamation (Reclamation), is considering whether to implement a proposed action under which Flaming Gorge Dam would be operated to achieve the flow and temperature regimes recommended in the September 2000 report Flow and Temperature Recommendations for Endangered Fishes in the Green River Downstream of Flaming Gorge Dam (2000 Flow and Temperature Recommendations), published by the Upper Colorado River Endangered Fish Recovery Program (Recovery Program).

198

Independent Oversight Review of the Savannah River Field Office Tritium Facilities Radiological Controls Activity-Level Implementation, November 2013  

Broader source: Energy.gov (indexed) [DOE]

of the of the Savannah River Field Office Tritium Facilities Radiological Controls Activity-Level Implementation May 2011 November 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose................................................................................................................................................ 1 2.0 Scope................................................................................................................................................... 1 3.0 Background ......................................................................................................................................... 1

199

L-Reactor Operation Savannah River Plant Aiken, SC  

Broader source: Energy.gov (indexed) [DOE]

51371 (F.R.) 51371 (F.R.) NOTICES DEPARTMENT OF ENERGY L-Reactor Operation, Savannah River Plant Aiken, South Carolina; Finding of No Significant Impact Monday, August 23, 1982 *36691 The Department of Energy (DOE) proposes to resume operation of L- Reactor at its Savannah River Plant at Aiken, South Carolina, as soon as it is ready for operation, scheduled for October 1983. The environmental impacts of the resumption of operation have been evaluated in an environmental assessment (DOE/EA-0195), prepared in accordance with the National Environmental Policy Act of 1969 (NEPA) as implemented by regulations promulgated by the Council on Environmental Quality (CEQ) (40 CFR Parts 1500 -1508, November 1978) and DOE implementing guidelines (45 FR 20694, March 28, 1980). Based on the analysis in the assessment, DOE has

200

Ir L (I.~ DEPARTMENT OF ENERGY ALBUQUERQUE OPERATIONS OFFICE  

Office of Legacy Management (LM)

Ir Ir L (I.~ DEPARTMENT OF ENERGY ALBUQUERQUE OPERATIONS OFFICE I.: ~ CONTRACT NO. DE-AC04-83AL18796 1. Vicinity Property i: Completion Report i , . Remedial Actions , cContractor 4,. -~'~ ~for the Uranium Mill Tailings ~~~z ~ Remedial Actions Project - MK-FEROUSON COMPANY *C~Ad PEE *CMIWN>tfIOW VICINITY PROPERTY COMPLETION REPORT AT CA-401 MAYERS STREET BRIDGEVILLE, PA 15017 JUNE 30, 1987 FOR URANIUM MILL TAILINGS REMEDIAL ACTION PROJECT OFFICE ALBUQUERQUE OPERATIONS OFFICE U.S. DEPARTMENT OF ENERGY ALBUQUERQUE, NM BY MK-FERGUSON CC IPANY AND CHEM-NUCLEAR SYSTEMS, INC. MK-Ferguson Company has been granted authorization to perform remedial action under the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604. Remedial action was done in accordance to the EPA Standards for

Note: This page contains sample records for the topic "river operations office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

DOE - Office of Legacy Management -- Green River Mill Site - UT 0-01  

Office of Legacy Management (LM)

Green River Mill Site - UT 0-01 Green River Mill Site - UT 0-01 FUSRAP Considered Sites Site: Green River Mill Site (UT.0-01 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Green River, Utah, Disposal Site Documents Related to Green River Mill Site Data Validation Package for the June 2009 Groundwater and Surface Water Sampling at the Green River, Utah, Disposal Site; LMS/GRN/S0609; October 2009 2012 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites-Green River, Utah, Disposal Site. LMS/S09461. February 2013 Historic Fact Sheet: Green River Disposal Site Uranium ore was

202

Cleanup Progresses at the Office of River Protection | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Cleanup Progresses at the Office of River Protection Cleanup Progresses at the Office of River Protection Cleanup Progresses at the Office of River Protection December 24, 2013 - 12:00pm Addthis The concrete “core” is removed from Tank C-105 after workers cut a 55-inch hole in the tank dome. The concrete "core" is removed from Tank C-105 after workers cut a 55-inch hole in the tank dome. A composite image of dozens of individual-frame photos taken inside Tank C-110 provides a rare panoramic view of its interior. Portions of the tank floor and the Foldtrack waste-retrieval system are clearly visible. A composite image of dozens of individual-frame photos taken inside Tank C-110 provides a rare panoramic view of its interior. Portions of the tank floor and the Foldtrack waste-retrieval system are clearly visible.

203

Cleanup Progresses at the Office of River Protection | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Cleanup Progresses at the Office of River Protection Cleanup Progresses at the Office of River Protection Cleanup Progresses at the Office of River Protection December 24, 2013 - 12:00pm Addthis The concrete “core” is removed from Tank C-105 after workers cut a 55-inch hole in the tank dome. The concrete "core" is removed from Tank C-105 after workers cut a 55-inch hole in the tank dome. A composite image of dozens of individual-frame photos taken inside Tank C-110 provides a rare panoramic view of its interior. Portions of the tank floor and the Foldtrack waste-retrieval system are clearly visible. A composite image of dozens of individual-frame photos taken inside Tank C-110 provides a rare panoramic view of its interior. Portions of the tank floor and the Foldtrack waste-retrieval system are clearly visible.

204

Office of River Protection Women-Owned Small Business Contractor Receives  

Broader source: Energy.gov (indexed) [DOE]

River Protection Women-Owned Small Business Contractor River Protection Women-Owned Small Business Contractor Receives One-Year Extension Office of River Protection Women-Owned Small Business Contractor Receives One-Year Extension December 19, 2012 - 10:33am Addthis Richland - - The Energy Department's Office of River Protection announced the contract for Advanced Technologies and Laboratories International Inc. (ATL) has been extended for a second one-year option. ATL, a women-owned small business, will continue to provide analytical services and testing work at the Hanford Site 222-S Laboratory through January 2, 2014. "ORP values ATL's performance and commitment to safety," said Ellen Mattlin, Tank Farm Programs Division Director. "DOE appreciates the technical and management capabilities demonstrated by the ATL workforce."

205

Redelegation Order No. 00-002.04-01 to the Chief Operating Officer...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Assistant Secretary for Fossil Energy Delegate: Chief Operating Officer Office of Fossil Energy Status: Current Effective Date: May 02, 2011 Re-delegation Allowed: Yes...

206

Retrieval of Tenth Single-shell Tank Complete at Hanford's Office of River  

Broader source: Energy.gov (indexed) [DOE]

Retrieval of Tenth Single-shell Tank Complete at Hanford's Office Retrieval of Tenth Single-shell Tank Complete at Hanford's Office of River Protection Retrieval of Tenth Single-shell Tank Complete at Hanford's Office of River Protection December 27, 2012 - 12:00pm Addthis EM’s Office of River Protection has successfully removed waste from a tenth storage tank at the Hanford site. Located in C Farm, C-109 is one of 16 underground tanks ranging in capacity from 55,000 to 530,000 gallons. EM's Office of River Protection has successfully removed waste from a tenth storage tank at the Hanford site. Located in C Farm, C-109 is one of 16 underground tanks ranging in capacity from 55,000 to 530,000 gallons. Standing near a pipe providing access to the tank below, workers initiate a water soak aimed at loosening hard-to-remove-waste from the bottom of the underground tank known as C-109.

207

Department of Energy Idaho Operations Office - FOIA Homepage  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Electronic Reading Room Documents Electronic Reading Room Documents Freedom of Information Act (FOIA) More on FOIA/Privacy Act Electronic Request Form Frequently Ask Questions Frequently Requested Documents Guides Helpful Links Points of Contact and Privacy Act Advisory Privacy Act Reading Room DOE-ID Public Reading Room Research Library You are here: DOE-ID Home > FOIA Department of Energy Idaho Operations Office Freedom of Information Act (FOIA) The Freedom of Information Act (FOIA) allows you to obtain information from various agencies of the Federal government including the current Department of Energy Idaho Operations Office (DOE-ID) and its operating contractors, as well as predecessor organizations. The Privacy Act (PA) is a companion to the FOIA. The PA allows individuals to seek access to Federal agency

208

Exhibit D: Mirant Potomac River Schedule of Unit Operations: Supplement 4, January- March 2006  

Broader source: Energy.gov [DOE]

Docket No. EO-05-01: Exhibit D: Mirant Potomac River Schedule of Unit Operations in support of Supplement Number 4 to the Operating Plan of Mirant Potomac River, LLC

209

Exhibit D: Mirant Potomac River Schedule of Unit Operations: Supplement 3, January and February 2006  

Broader source: Energy.gov [DOE]

Docket No. EO-05-01: Exhibit D: Mirant Potomac River Schedule of Unit Operations, part of Supplement Number 3 to the Operating Plan of Mirant Potomac River, LLC

210

Exhibit D: Mirant Potomac River Schedule of Unit Operations: January- March 2006  

Broader source: Energy.gov [DOE]

Docket No. EO-05-01: Exhibit D: Mirant Potomac River Schedule of Unit Operations related to Supplement Number 4 of the Operating Plan of Mirant Potomac River, LLC

211

Exhibit D: Mirant Potomac River Schedule of Operations: January and February 2006  

Broader source: Energy.gov [DOE]

Docket No. EO-05-01. Exhibit D: Mirant Potomac River Schedule of Operations, January and February 2006

212

CRAD, Occupational Safety & Health- Office of River Protection K Basin Sludge Waste System  

Broader source: Energy.gov [DOE]

A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a May 2004 assessment of the Environment, Safety and Health program at the Office of River Protection K Basin Sludge Waste System.

213

CRAD, Engineering- Office of River Protection K Basin Sludge Waste System  

Broader source: Energy.gov [DOE]

A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a May 2004 assessment of the Engineering program at the Office of River Protection K Basin Sludge Waste System.

214

CRAD, Training- Office of River Protection K Basin Sludge Waste System  

Broader source: Energy.gov [DOE]

A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a May 2004 assessment of the Environment, Safety and Health program at the Office of River Protection K Basin Sludge Waste System.

215

CRAD, Emergency Management- Office of River Protection K Basin Sludge Waste System  

Broader source: Energy.gov [DOE]

A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a May 2004 assessment of the Emergency Management program at the Office of River Protection K Basin Sludge Waste System.

216

Richland Operations Office Completes Cleanup in Hanford's 300 Area North  

Broader source: Energy.gov (indexed) [DOE]

Richland Operations Office Completes Cleanup in Hanford's 300 Richland Operations Office Completes Cleanup in Hanford's 300 Area North Section Richland Operations Office Completes Cleanup in Hanford's 300 Area North Section March 28, 2013 - 12:00pm Addthis An aerial view of Hanford’s 300 Area North Section following completion of cleanup. An aerial view of Hanford's 300 Area North Section following completion of cleanup. Workers demolish the 384 Building, known as the Power House and Heating Plant, in the north portion of the 300 Area. Workers demolish the 384 Building, known as the Power House and Heating Plant, in the north portion of the 300 Area. More than 8,000 feet of pipe — part of the 300 Area’s process sewer system — was removed from the 300-15 Waste Site in the north section. More than 8,000 feet of pipe - part of the 300 Area's process sewer

217

Richland Operations Office Completes Cleanup in Hanford's 300 Area North  

Broader source: Energy.gov (indexed) [DOE]

Richland Operations Office Completes Cleanup in Hanford's 300 Richland Operations Office Completes Cleanup in Hanford's 300 Area North Section Richland Operations Office Completes Cleanup in Hanford's 300 Area North Section March 28, 2013 - 12:00pm Addthis An aerial view of Hanford’s 300 Area North Section following completion of cleanup. An aerial view of Hanford's 300 Area North Section following completion of cleanup. Workers demolish the 384 Building, known as the Power House and Heating Plant, in the north portion of the 300 Area. Workers demolish the 384 Building, known as the Power House and Heating Plant, in the north portion of the 300 Area. More than 8,000 feet of pipe — part of the 300 Area’s process sewer system — was removed from the 300-15 Waste Site in the north section. More than 8,000 feet of pipe - part of the 300 Area's process sewer

218

United States Government Department of Energy Idaho Operations Office  

Broader source: Energy.gov (indexed) [DOE]

0, 2012 0, 2012 Subject: Fiscal Year 2012 National Environmental Policy Act Planning Summary (OS-ETSD-12-011) To: Timothy G. Lynch, Acting General Counsel DOE-HQ, GC-IIFORS In accordance with DOE Order 451.1 B, the Department of Energy, Idaho Operations Office (DOE-ID) is submitting its Fiscal Year (FY) 2012 National Environmental Policy Act (NEPA) Planning Summary. The FY 2012 NEPA Planning Summary will be made available to the public as required by the Order. Estimated NEPA document costs are provided for actions that are well enough defined from a planning and budget perspective. If you have any questions concerning the attachment or the DOE-ID NEPA compliance program, please contact me or our NEP A Compliance Officer, Jack Depperschmidt, at (208) 526-5053.

219

Operating Plan of Mirant Potomac River, LLC in Compliance with Order No.  

Broader source: Energy.gov (indexed) [DOE]

Operating Plan of Mirant Potomac River, LLC in Compliance with Operating Plan of Mirant Potomac River, LLC in Compliance with Order No. 202-05-03 Operating Plan of Mirant Potomac River, LLC in Compliance with Order No. 202-05-03 Docket No. EO-05-01: Attached is the Operating Plan of Mirant Potomac River, LLC, which is being submitted in compliance with Order No. 202-05-03, issued by the Department of Energy on December 20, 2005, in the captioned proceeding. Operating Plan of Mirant Potomac River, LLC in Compliance with Order No. 202-05-03 More Documents & Publications Supplement Number 1 to Operating Plan of Mirnat Potomac River, LLC in Compliance with Order No. 202-05-03 Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: Advanced Notice of Power Outages. Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages

220

U. S. Department of Energy Savannah River Operations Office - Saltstone  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Saltstone Permit Reports Saltstone Permit Reports Saltstone Permit Reports SRS Saltstone Disposal Facility Performance Assessment External Link Saltstone Permit Report Website User's Guide Adobe Acrobat PDF Saltstone Permit Reporting Data -- Third Quarter 2013 Adobe Acrobat PDF Saltstone Permit Reporting Data -- Second Quarter 2013 (1) Adobe Acrobat PDF Saltstone Permit Reporting Data -- First Quarter 2013 (1) Adobe Acrobat PDF Saltstone Permit Reporting Data -- Fourth Quarter 2012 (1) Adobe Acrobat PDF Saltstone Permit Reporting Data -- Third Quarter 2012 (1) Adobe Acrobat PDF Saltstone Permit Reporting Data -- Second Quarter 2012 Adobe Acrobat PDF Saltstone Permit Reporting Data -- First Quarter 2012 Adobe Acrobat PDF Saltstone Permit Reporting Data -- Fourth Quarter 2011 (1) Adobe Acrobat PDF

Note: This page contains sample records for the topic "river operations office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

FTCP FAQ Standards Qualifying Officials List - Savannah River Operations Office  

Broader source: Energy.gov (indexed) [DOE]

SR TQP Functional Area Qualifying Officials SR TQP Functional Area Qualifying Officials Functional Area Name Phone Organization Chemical Processing Pat Suggs 803-208-2908 AMWDP I Ci vi] Structural Engineering Mike Dholakia 803-208-1228 AMWDP Brent Gutierrez 803-208-2969 AMWDP I Construction Management Robert Baker 803-644-3711 AMWDP William Huxford 803-952-4281 NNSA Criticality Safety Glenn Christenbury 803-208-3737 NNSA Norm Shepard 803-208-3618 AMNMSP Deactivation and Decommissioning Angelia Adams 803-952-8593 AMCP Helen Belencan 803-952-8696 AMCP Electrical Systems Fred Brown 803-208-2529 AMWDP Michael Mikolanis 803-208-1223 AMWDP Marc Woodworth 803-208-3966 AMNMSP Emergency Management Cindy Brizes 803-952-4290 NNSA Howard Burgess 803-952-5538 OS SES Environmental Compliance ·A very Hammett 803-952-7805 AMCP

222

Qualifying Officials Designation Form - Savannah River Operations Office  

Broader source: Energy.gov (indexed) [DOE]

SR 359 (Rev 1.0-2011) SR 359 (Rev 1.0-2011) SRM 300.1-1 C11ap1er 6. Sectiai 6.1 Request to Add/Remove TQP Qualifying Official (QO) Designation QO or Candidate (Print Name) Requesting Supervisor (Print Name) Supervisor (Signature) !control Number OHCM- I Date 0 Add the following QO designation(s) 0 Remove the following QO designation(s) Functional Area Print "ALL" or List Applicable Competencies 1 2 3 4 - I 5 --~-+ 6 7 8 9 10 Addition or Removal of the QO Designation is based on the following event, qualification, training or expertise: (Attach additional sheets if required) Comments r" 11..1"\ '-'-··--· '"''·-- \t ""' "alllt:/ r" lvl"\ l"11\jll01UIC/ ua1e AM/OD Approval (Print Name) AM/OD (Signature) Date

223

Senior Technical Safety Manger - Savannah River Operations Office  

Broader source: Energy.gov (indexed) [DOE]

Qualifying Officials Qualifying Officials Page 1 of l Functional Area: Senior Technical Safety Manager 11/1/2011 Number Qualifying Official(s): 2006: 1 Pat McGuire. Michael Mikolanis, Terry Spears 2006: 2 Edgar Gates 2006: 3 Pat McGuire. Michael Mikolanis, Terry Spears 2006: 4 Michael Mikolanis. Sheri Robinson, Brenda Mills 2006: 5 Pat McGuire. Michael Mikolanis. Terry Spears 2006: 6 Thomas Temple. Michael M1kolams. Charles Harris. James Kekacs 2006: 7 David Hoel. Philip Prater, Brenda Mills 2006: 8 Yvonne Gentry, Augie Maniez, * Paulette Kenner (h), Darren Parham 2006: 9 Cindy Brizes, Howard Burgess 2006: 10 Pat McGuire. Michael Mikolanis . Terry Spears 2006: 1 I Pat McGuire. Michael Mikolanis. Terry Spears 2006: 12 Pat McGuire, Michael Mikolanis, Terry Spears, Gary Borba

224

U. S. Department of Energy Savannah River Operations Office ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

On: DOE-SR Facebook DOE-SR Twitter DOE-SR YouTube DOE-SR Flickr Click below to view: German HEU Public Meeting Broadcast Local Weather News DOE-SR News Releases SRS Videos &...

225

U. S. Department of Energy Savannah River Operations Office ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

German HEU Project Documents German HEU Project Documents Potential Acceptance and Disposition of Gernam Pebble Bed Research Reactor Highly Enriched Uranium (HEU) Fuel...

226

PIA - Savannah River Operations Office File and Print Services...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and Print Services More Documents & Publications PIA - Bonneville Power Adminstration Ethics Helpline Integrated Safety Management Workshop Registration, PIA, Idaho National...

227

PIA - DOE Savannah River Operations Office PRISM System | Department...  

Broader source: Energy.gov (indexed) [DOE]

Registration, PIA, Idaho National Laboratory PIA - Bonneville Power Adminstration Ethics Helpline PIA - Advanced Test Reactor National Scientific User Facility Users Week 2009...

228

TQP Qualifying Official Training Approaches- Savannah River Operations Office  

Broader source: Energy.gov [DOE]

A QO is an individual who has the technical experience and/or education in a particular technical area and who, with the necessary training, is authorized to sign qualification cards for designated competencies.

229

FTCP Site Specific Information - Savannah River Operations Office...  

Broader source: Energy.gov (indexed) [DOE]

803952-8187 michael.mikolanis@srs.gov Annual Workforce Analysis and Staffing Plan Reports Calendar Year 2013 Calendar Year 2012 Calendar Year 2011 Calendar Year 2010 TQP...

230

U. S. Department of Energy Savannah River Operations Office ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

at Los Alamos National Laboratory (LANL), to include LANL's senior technical advisor to Rocky Flats for nuclear waste management and co-leader for the environmental restoration...

231

U. S. Department of Energy Savannah River Operations Office ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

group where she spent 17 years before going on to be named Project Manager for the Rocky Flats Environmental Remediation Project. There she was responsible for the...

232

U. S. Department of Energy Savannah River Operations Office ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Interest Freedom of Information Act Leadership Dr. David C. Moody III - Manager T. Zack Smith - Deputy Manager Sandra Waisley - Assistant Manager for Organizational Culture,...

233

DOE - Office of Legacy Management -- Wabash River Ordnance Works...  

Office of Legacy Management (LM)

None Location: Newport , Indiana IN.03-1 Evaluation Year: 1987 IN.03-2 Site Operations: Produced heavy water for the MED in the mid-1940s. IN.03-1 Site Disposition: Eliminated -...

234

Review of the Sandia Site Office Quality Assurance Assessment of the Manzano Nuclear Operations, January 2013  

Broader source: Energy.gov (indexed) [DOE]

of the of the Sandia Site Office Quality Assurance Assessment of the Manzano Nuclear Operations January 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose ................................................................................................................................................. 1 2.0 Scope.................................................................................................................................................... 1 3.0 Background ........................................................................................................................................... 1 4.0 Methodology ......................................................................................................................................... 2

235

Review of the Richland Operations Office Oversight of Implementation Verification Review Processes, November 2012  

Broader source: Energy.gov (indexed) [DOE]

Oversight Review Oversight Review of the Richland Operations Office Oversight of Implementation Verification Review Processes November 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose ................................................................................................................................................... 1 2.0 Background ............................................................................................................................................ 1 3.0 Scope....................................................................................................................................................... 2

236

UNITED STATES ATOMIC ENERGY COMMISSION CHICAGO OPERATIONS OFFICE  

Office of Legacy Management (LM)

$$ ,_, . $$ ,_, . UNITED STATES ATOMIC ENERGY COMMISSION CHICAGO OPERATIONS OFFICE TELEPHONE 9600 SOUTH CASS AVENUE (312) 739-7711 ARCONNE. ILLINOIS 60439 ^,/" _. i ' > ;.:a c. JAN 17 1975 Martin B. Biles, Director Division of Operational Safety, HQ _ DISPOSAL OF SCRAP COPPER, CYCLOTRON DISMANTLING PROJECT, NUCLEAR RESEARCH CENTER, CARNEGIE-MELLON UNIVERSITY (CMU) Enclosed for your information is a copy of the October 28, 1974, letter from T. Morris (CMD) to J. Krupa (CH) with pages 1-4 and 8-16 of its attachment (the October 23, 1974, F. Bomba to T. Morris, memo- randum; pages 5-7 are economically omitted as they were not relevant to the subject of this letter) regarding disposal of 4 to 6 tons of copper. The enclosure contains a summary of data obtained from

237

UNITED STATES ENERGY RESEARCH AND DEVELOPMENT CHICAGO OPERATIONS OFFICE  

Office of Legacy Management (LM)

CHICAGO OPERATIONS OFFICE 9800 SOUTH CASS AVENUE ARGONNE, ILLINOIS 80439 TELEPHONE (312) 739-7711 ADMINISTRATION JUL 11977 Hal Hollister, Acting Director Division of Operational and Environmental Safety, HQ RESURVEY PROGRAM - BRUSH BERYLLIUM COMPANY A visit to the Brush Beryllium Company (presently called Brush Wellman), Cleveland, Ohio was made by Edward J. Jascewsky and members of the Argonne National Laboratory survey team on May 17, 1977. The group met with Martin Powers and Nate Bass, Vice Presidents of Brush Wellman. The purpose of the visit was to determine if any radiological survey was needed as a result of past Atomic Energy Commission (AEC) contract work. The work performed by Brush Beryllium involving radioactive materials was done at two locations in the Cleveland area. One site was located

238

Independent Oversight Review, Richland Operations Office and CH2M Hill  

Broader source: Energy.gov (indexed) [DOE]

Richland Operations Office and CH2M Richland Operations Office and CH2M Hill Plateau Remediation Company and Mission Support Alliance - April 2012 Independent Oversight Review, Richland Operations Office and CH2M Hill Plateau Remediation Company and Mission Support Alliance - April 2012 April 2012 Review of Richland Operations Office and CH2M Hill Plateau Remediation Company and Mission Support Alliance Conduct of Operations The purpose of this independent oversight review by the U.S. Department of Energy (DOE) Office of Enforcement and Oversight, within the Office of Health, Safety and Security (HSS), was to observe and shadow1 a DOE Richland Operations Office (DOE-RL) assessment of its contractors at the Hanford Site. The HSS reviewer observed the implementation and effectiveness of the DOE-RL assessment of two of the contractors (CHPRC and

239

MAJOR BENJAMIN H. SMITH Major Benjamin H. Smith is the Operations Officer of the  

E-Print Network [OSTI]

BENJAMIN H. SMITH Major Benjamin H. Smith is the Operations Officer of the Air Force Reserve Officer Smith is a native of Omaha, Nebraska and entered the Air Force in June 2003. He received his commission

240

Analysis of potential impacts to resident fish from Columbia River System Operation alternatives  

Science Journals Connector (OSTI)

The US Army Corps of Engineers, the US Bureau of Reclamation, and the Bonneville Power Administration initiated the Columbia River System Operation Review...

David R. Geist; Lance W. Vail; Daniel J. Epstein

Note: This page contains sample records for the topic "river operations office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Employment Verification at Savannah River Site, INS-O-09-05 ...  

Broader source: Energy.gov (indexed) [DOE]

Employment Verification at Savannah River Site, INS-O-09-05 Employment Verification at Savannah River Site, INS-O-09-05 The Department of Energy's Savannah River Operations Office...

242

UNITED STATES ATOMIC ENERGY COMMISSION Iew York Operation8 Office  

Office of Legacy Management (LM)

fi ' fi ' J/ui : ,I/ /J ii%/~it~ - ,,(,C, \,\J,iT/~l \ 11, ?' UNITED STATES ATOMIC ENERGY COMMISSION Iew York Operation8 Office Files (.Thrur V.L.Parsegian, Director, Division of Technical Advisers) Decenber 19, 1950 9; G.Strc&e, Division of Technical Advisers COLD-DRAWING OF TJRAXItZI RODS A BXIDGEPORT BRATS CO'Ei+A!R Symbol: TAtFGSrmam On 12/11/50, an exper%mnt was conducted at the Bridgmort Brass Company in whioh an attanpt m m made to cold-draw hot-foiled rods of uranium tich had been pickled to remove the oxi:!e coating. In addition, a few mpickled bars were drawn. It can be uoncluded from this erperimmt that we x-me unable tith the lubricants used to draw the pickled rods of uranium. This' appears to verify the necessity for an oxide film on the uranium to

243

Dr. Bruce L. Chrisman Chief Operating Officer Fermilab  

Broader source: Energy.gov (indexed) [DOE]

Bruce L. Chrisman Bruce L. Chrisman Chief Operating Officer Fermilab P.O. Box 500 Batavia, IL 60510 Dear Dr. Chrisman: SUBJECT: NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) DETERMINATION AT FERMI NATIONAL ACCELERATOR LABORATORY (FERMILAB) - FERMILAB MUON CAMPUS, INCLUDING THE MUON TO ELECTRON CONVERSION (Mute) EXPERIMENT AND THE MC-1 BUILDING Reference: Letter, from B. Chrisman to M. Weis, dated June 6, 2012, Subject: NEPA Environmental Evaluation Notification Form (EENF) for the Fermilab Muon Campus, including the Mute Experiment and the MC-1 Building have reviewed the Fermilab EENF for the Fermilab Muon Campus, including the Mute Experiment and the MC-1 Building. Based on the information provided in the EENF, I have approved the following categorical exclusion (CX): Project Name Approved CX

244

Dr, Bruce L. Chrisman Chief Operating Officer F~rmilab  

Broader source: Energy.gov (indexed) [DOE]

Dr, Bruce L. Chrisman Dr, Bruce L. Chrisman Chief Operating Officer F~rmilab P.O. Box 500 Batavia, IL 60510 Dear Dr. Chrisman: SUBJECT": NATIONAL ENVIRQNMENTAL POLICY ACT (NEPI~) DETERMINATION .~T FERMI N,4TIONAL ACCELERATOR LABORATORY (FERMILAB~ - 35 TOE( LIQUID ARGON PROTOTYPE DETECTOR Reference: Letter, from B. Chrisman to M. Weis, dated Aprif 11, 2012, Subject: National Environmental Policy Act (NEPA) Environmental Evaluation Notification Forrri (EENF) for the 35 Ton Liquid Argon Prototype Detector have reviewed the Fermilab EENF for the 35 Ton Liquid Argon Prototype Detector. Based on the information provided in the EENF, I have approved the following categorical exclusion (CX): Project Name 35 Ton Liquid Argon Detector Approved CX 4/12/207 2 B3.6 am returning a signed copy of the EENF for your records. No further ~IEPA review is required.

245

Mr. Jack W. Anderson Chief Operating Officer Fermilab  

Broader source: Energy.gov (indexed) [DOE]

~y ~y ,~ !l` ~; Mr. Jack W. Anderson Chief Operating Officer Fermilab P.O. Box 500 Batavia, IL 60510 Dear Mr. Anderson: SUBJECT: NATIONAL ENVIRONM ENTAL POLICY ACT (NEPA) DETERMIN ATION AT FERMI NATIONAL ACCELERA TOR LABORATO RY (FERMILAB ) - NORTHERN ILLINOIS CENTER FOR ACCELERA TOR AND DETECTOR DEVELOPM ENT (NICADD) EXTRUSIO N LINE FACILITY Reference: Letter, from J. Anderson to M. Weis, dated February 13, 2013, Subject: NEPA Environment al Evaluation Notification Form (EENF) for the NICADD Extrusion Line Facility have reviewed the Fermilab EENF for the NICADD Extrusion Line Facility. Based on the information provided in the EENF, I have approved the following categorical exclusion (CX): Project Name A~groved CX NICADD Extrusion Line Facility 2/20/2013 B1.15 am returning a signed copy of the EENF for your records. No further NEPA review is required.

246

United States Government Department of Energy Idaho Operations Office  

Broader source: Energy.gov (indexed) [DOE]

1, 2011 1, 2011 Subject: 2011 National Environmental Policy Act Planning Summary (OS-ETSD-11-001) To: Scott Blake Harris, General Counsel DOE-HQ, GC-1IFORS In accordance with DOE Order 451.1 B, the Department of Energy, Idaho Operations Office (DOE-ID) is submitting its 2011 National Environmental Policy Act (NEPA) Planning Summary. The 2011 NEPA Planning Summary will be made available to the public as required by the Order. Estimated NEPA document costs are provided for actions that are well enough defined from a planning and budget perspective. If you have any questions concerning the attachment or the DOE-ID NEPA compliance program, please contact me or our NEPA Compli (208) 526-5053. ',Manager Attachment cc: C. M. Borgstrom, DOE-HQ, GC-54/FORS B. M. Angle, BBWI, MS-3428

247

Mr. Jack W. Anderson Chief Operating Officer Fermilab  

Broader source: Energy.gov (indexed) [DOE]

A~ ~ ~ 2013 A~ ~ ~ 2013 Mr. Jack W. Anderson Chief Operating Officer Fermilab P.O. Box 500 Batavia, IL 60510 Dear Mr. Anderson: SUBJECT: NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) DETERMINATION FOR' THE GEOTECHNICAL INVESTIGATION OF THE LONG BASELINE NEUTRINO EXPERIMENT (LBNE) DETECTOR SITE IN SOUTH DAKOTA Reference: Letter, from J. Anderson to M. Weis, dated March 21, 2013, Subject: NEPA Environmental Evaluation Notification Form (EENF) for the Geotechnical Investigation of the LBNE Detector Site in South Dakota have reviewed the EENF for the Geotechnical Investigation of the LBNE Detector Site in South Dakota. Based on the information provided in the EENF, I have approved the following categorical exclusion (CX): Protect Name Approved CX Geotechnical Investigation of the LBNE 3/27/2013 B3.1

248

ENERGY RESEARCH AND DEVELOPMENT ADMINISTRATION SAN FRANCISCO OPERATIONS OFFICE  

Office of Legacy Management (LM)

OR. I-s- - OR. I-s- - c" - ENERGY RESEARCH AND DEVELOPMENT ADMINISTRATION SAN FRANCISCO OPERATIONS OFFICE 1333 EIROAOWAY OAKLAND, CALIFORNIA 64612 f&t/ 12, 19-X E. K. Loop, Chief Process Facilities Safety Branch, Division of Safety, Standards and Compliance P'&.DIOLOGICAL SITUATION AT ALBANY METALLURGICAL RESEARCH CENTER The following information is submitted in response to your subject request. The enclosed table provides the history of the AEC and ERDA spon- sored research activities conducted at Albany Metallurgical Re- search Center (AMRC). None of these activities has been covered by an AEC or NRC license. However, AMRC has filed application for an amendment to an existing NRC license in order to cover the ongoing ERDA sponsored radioactive work.

249

Mr. Jack W. Anderson Chief Operating Officer Fermilab  

Broader source: Energy.gov (indexed) [DOE]

Jack W. Anderson Jack W. Anderson Chief Operating Officer Fermilab P.O. Box 500 Batavia, IL 60510 Dear Mr. Anderson: SUBJECT: NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) DETERMINATION AT i FERMI NATIONAL ACCELERATOR LABORATORY (FERMILAB) - HYDROSTATIC RELIEF ACTION AT THE NEUTRINOS AT THE MAIN INJECTOR (NUMI) Reference: Letter, from J. Anderson to M. Weis, dated January 16, 2013, Subject: NEPA Environmental Evaluation Notification Form (EENF) for the Hydrostatic Relief Action at NuMI have reviewed the Fermilab EENF for the Hydrostatic Relief Action at NuMI. Based on the information provided in the EENF, I have approved the following categorical exclusion (CX): Project Name Approved CX Hydrostatic Relief Action at NuMI 1/76/2013 B2.5 am returning a signed copy of the EENF for your records. No further NEPA review is required.

250

X013 Mr. Jack Anderson Chief Operating Officer Fermilab  

Broader source: Energy.gov (indexed) [DOE]

JUI~ 0 ~ JUI~ 0 ~ X013 Mr. Jack Anderson Chief Operating Officer Fermilab P.O. Box 500 Batavia, IL 60510 Dear Mr. Anderson: SUBJECT: NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) DETERMINATION AT FERMI NATIONAL ACCELERATOR LABORATORY (FERMILAB) - VARIOUS DEMOLITION JOBS 2013 Reference: Memorandum, from J. Anderson to M. Weis, dated May 28, 2013, Subject: National Environmental Policy Act (NEPA) Environmental Evaluation Notification Form (EENF) for Various Demolitions 2013 have reviewed the Fermilab EENF for the Various Demolition Jobs in 2013 that include 37-39 Shabbona, 31-33 Blackhawk, the Village Water Tower, Trailer 159, and the Site 50 T&M Barn and Building A. Based on the information provided in the EENF, I have approved the following categorical exclusion (CX):

251

Mr. Jack W. Anderson Chief Operating Officer Fermilab  

Broader source: Energy.gov (indexed) [DOE]

~' ~' Mr. Jack W. Anderson Chief Operating Officer Fermilab P.O. Box 500 Batavia, I L 60510 Dear Mr. Anderson: SUBJECT: NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) DETERMINATION AT FERMI NATIONAL ACCELERATOR LABORATORY (FERMILAB) - SITEWIDE DOMESTIC WATER SERVICE (DWS) REPLACEMENT PROJECT Reference: Letter, J. Anderson to M. Weis, dated August 30, 2012, Subject: National Environmental Policy Act (NEPA) Environmental Evaluation Notification Form (EENF) for the Sitewide Domestic Water Service Replacement Project have reviewed the Fermilab EENF for the Sitewide Domestic Water Service Replacement Project. Based on the information provided in the EENF, I have approved the following categorical exclusion (CX): Protect Name Approved CX Sitewide DWS 9/04/2012 B1.3, 81.15 Replacement Project

252

DOE Selects Savannah River Nuclear Solutions, LLC to Manage and Operate its  

Broader source: Energy.gov (indexed) [DOE]

DOE Selects Savannah River Nuclear Solutions, LLC to Manage and DOE Selects Savannah River Nuclear Solutions, LLC to Manage and Operate its Savannah River Site DOE Selects Savannah River Nuclear Solutions, LLC to Manage and Operate its Savannah River Site January 10, 2007 - 10:24am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that Savannah River Nuclear Solutions (SRNS), LLC has been selected as the management and operating contractor for DOE's Savannah River Site (SRS) in Aiken, South Carolina. The contract is a cost-plus award-fee contract valued at approximately $800 million per year and is for a five-year base period with the option to extend it for up to five additional years. SRNS is a limited liability corporation consisting of Fluor Federal Services, Inc., Honeywell International, Inc., and Newport News

253

DOE Selects Savannah River Nuclear Solutions, LLC to Manage and Operate its  

Broader source: Energy.gov (indexed) [DOE]

Savannah River Nuclear Solutions, LLC to Manage and Savannah River Nuclear Solutions, LLC to Manage and Operate its Savannah River Site DOE Selects Savannah River Nuclear Solutions, LLC to Manage and Operate its Savannah River Site January 10, 2007 - 10:24am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that Savannah River Nuclear Solutions (SRNS), LLC has been selected as the management and operating contractor for DOE's Savannah River Site (SRS) in Aiken, South Carolina. The contract is a cost-plus award-fee contract valued at approximately $800 million per year and is for a five-year base period with the option to extend it for up to five additional years. SRNS is a limited liability corporation consisting of Fluor Federal Services, Inc., Honeywell International, Inc., and Newport News

254

Independent Oversight Review, Richland Operations Office and CH2M Hill Plateau Remediation Company and Mission Support Alliance- April 2012  

Broader source: Energy.gov [DOE]

Review of Richland Operations Office and CH2M Hill Plateau Remediation Company and Mission Support Alliance Conduct of Operations

255

ISE 2012, Vienna USING RIVER RESTORATION OPERATIONS TO TEST  

E-Print Network [OSTI]

and hydroelectricity since the 19th century. A restoration program of the river started officially in 1998. It has, the Rhône River has been regulated for navigation, irrigation and hydroelectricity since the 19th century

Paris-Sud XI, Université de

256

United States Department of Energy Nevada Operations Office Environmental Compliance Handbook. Third edition  

SciTech Connect (OSTI)

The Environment, Safety & Health Division (ESHD) of the Nevada Operations Office has prepared this Environmental Compliance Handbook for all users of the Nevada Test Site (NTS) and other US Department of Energy, Nevada Operations Office (DOE/NV) facilities. The Handbook gives an overview of the important environmental laws and regulations that apply to the activities conducted by the Nevada Operations Office and other users of DOE/NV facilities in Nevada.

NONE

1998-03-01T23:59:59.000Z

257

Supplement Number 2 to the Operating Plan of Mirant Potomac River, LLC |  

Broader source: Energy.gov (indexed) [DOE]

2 to the Operating Plan of Mirant Potomac River, 2 to the Operating Plan of Mirant Potomac River, LLC Supplement Number 2 to the Operating Plan of Mirant Potomac River, LLC Docket No. EO-05-01. Order No. 202-05-03: Pursuant to Section 202(c) of the Federal Power Act, 16 USC §824a(c), Section 301(b) of the Department of Energy Organization Act, 42 USC §7151(b), and Order No. 202-05-3, issued by the Department of Energy ("DOE" or the "Department") on December 20,2005 ("Order"), Mirant Potomac River, LLC ("Mirant") hereby submits the following Supplement Number 2 to the Operating Plan submitted to the Department on December 30, 2005 (the "Operating Plan") in response to the Order. Supplement Number 2 to the Operating Plan of Mirant Potomac River, LLC More Documents & Publications

258

Supplement Number 1 to Operating Plan of Mirnat Potomac River, LLC in  

Broader source: Energy.gov (indexed) [DOE]

Supplement Number 1 to Operating Plan of Mirnat Potomac River, LLC Supplement Number 1 to Operating Plan of Mirnat Potomac River, LLC in Compliance with Order No. 202-05-03 Supplement Number 1 to Operating Plan of Mirnat Potomac River, LLC in Compliance with Order No. 202-05-03 Docket No. EO-05-01: Pursuant to Section 202(c) of the Federal Power Act, 16 USC §824a(c), Section 301 (b) of the Department of Energy Organization Act, 42 USC §7151 (b), and Order No. 202-05-3, issued by the Department of Energy ("DOE" or the "Department") on December 20, 2005 ("Order"), Mirant Potomac River, LLC ("Mirant") hereby submits the following Supplement Number 1 to the Operating Plan submitted to the Department on December 30, 2005 (the "Operating Plan") in response to the Order. Supplement Number 1 to Operating Plan of Mirnat Potomac River, LLC in

259

Supplement Number 4 to the Operating Plan of Mirant Potomac River, LLC |  

Broader source: Energy.gov (indexed) [DOE]

4 to the Operating Plan of Mirant Potomac River, 4 to the Operating Plan of Mirant Potomac River, LLC Supplement Number 4 to the Operating Plan of Mirant Potomac River, LLC Docket No. EO-05-01: Pursuant to Section 202(c) of the Federal Power Act, 16 USC § 824a(c), Section 301(b) of the Department of Energy Organization Act, 42 USC §7151 (b), and Order No, 202-05-3, isslled by the Department of Energy ("DOE" or the "Department") on December 20, 2005 ("Order"), Mirant Potomac River, LLC ("Mirant") hereby submits the following Supplement Number 4 to the Operating Plan submitted to the Department on December 30, 2005 (the "Operating Plan") in response to the Order, Supplement Number 4 to the Operating Plan of Mirant Potomac River, LLC More Documents & Publications

260

Supplement Number 3 to the Operating Plan of Mirant Potomac River, LLC |  

Broader source: Energy.gov (indexed) [DOE]

3 to the Operating Plan of Mirant Potomac River, 3 to the Operating Plan of Mirant Potomac River, LLC Supplement Number 3 to the Operating Plan of Mirant Potomac River, LLC Docket No. EO-05-01:Pursuant to Section 202(c) of the Federal Power Act, 16 USC §824a(c), Section 301 (b) of the Department of Energy Organization Act, 42 USC §7151 (b), and Order No. 202-05-3, issued by the Department of Energy ("DOE" or the "Department") on December 20, 2005 ("Order"), Mirant Potomac River, LLC ("Mirant") hereby submits the following Supplement Number 3 to the Operating Plan submitted to the Department on December 30, 2005 (the "Operating Plan") in response to the Order. Supplement Number 3 to the Operating Plan of Mirant Potomac River, LLC More Documents & Publications

Note: This page contains sample records for the topic "river operations office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Supplement Number 5 to the Operating Plan of Mirant Potomac River, LLC in  

Broader source: Energy.gov (indexed) [DOE]

5 to the Operating Plan of Mirant Potomac River, 5 to the Operating Plan of Mirant Potomac River, LLC in Compliance with Order No. 202-05-03 Supplement Number 5 to the Operating Plan of Mirant Potomac River, LLC in Compliance with Order No. 202-05-03 Docket No. EO-05-01: Pursuant to Section 202(c) of the Federal Power Act, 16 USC §824a(c), Section 301(b) of the Department of Energy Organization Act, 42 USC §7151(b), and Order No. 202-05-3, issued by the Department of Energy ("DOE" or the "Department") on December 20, 2005 ("Order"), Mirant Potomac River, LLC ("Mirant") hereby submits the following Supplement Number 5 to the Operating Plan submitted to the Department on December 30, 2005 (the "Operating Plan") in response to the Order. Supplement Number 5 to the Operating Plan of Mirant Potomac River, LLC in

262

Operational Readiness Review: Savannah River Replacement Tritium Facility  

SciTech Connect (OSTI)

The Operational Readiness Review (ORR) is one of several activities to be completed prior to introducing tritium into the Replacement Tritium Facility (RTF) at the Savannah River Site (SRS). The Secretary of Energy will rely in part on the results of this ORR in deciding whether the startup criteria for RTF have been met. The RTF is a new underground facility built to safely service the remaining nuclear weapons stockpile. At RTF, tritium will be unloaded from old components, purified and enriched, and loaded into new or reclaimed reservoirs. The RTF will replace an aging facility at SRS that has processed tritium for more than 35 years. RTF has completed construction and is undergoing facility startup testing. The final stages of this testing will require the introduction of limited amounts of tritium. The US Department of Energy (DOE) ORR was conducted January 19 to February 4, 1993, in accordance with an ORR review plan which was developed considering previous readiness reviews. The plan also considered the Defense Nuclear Facilities Safety Board (DNFSB) Recommendations 90-4 and 92-6, and the judgements of experienced senior experts. The review covered three major areas: (1) Plant and Equipment Readiness, (2) Personnel Readiness, and (3) Management Systems. The ORR Team was comprised of approximately 30 members consisting of a Team Leader, Senior Safety Experts, and Technical Experts. The ORR objectives and criteria were based on DOE Orders, industry standards, Institute of Nuclear Power Operations guidelines, recommendations of external oversight groups, and experience of the team members.

Not Available

1993-02-01T23:59:59.000Z

263

Inspection of Westinghouse Savannah River Company Fees for Managing and Operating the Savannah River Site, IG-0377  

Broader source: Energy.gov (indexed) [DOE]

IG-1 IG-1 INFORMATION: Report on "Inspection of Westinghouse Savannah River Company Fees for Managing and Operating the Savannah River Site" The Secretary BACKGROUND: During the first five years of its contract with the Department of Energy, Westinghouse Savannah River Company was paid over $130 million in fees to manage and operate the Savannah River Site. Fees paid to Westinghouse steadily increased over the five year period. For example, fees paid for the last six months of this five year period were over three times as large as fees paid for the first six months. The purpose of this inspection was to review the Department's annual negotiation of total available fees with Westinghouse, and to examine the reasons for the growth

264

Review of the Sandia Site Office Quality Assurance Assessment of the Manzano Nuclear Operations, January 2013  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Review of the Review of the Sandia Site Office Quality Assurance Assessment of the Manzano Nuclear Operations January 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose ................................................................................................................................................. 1 2.0 Scope.................................................................................................................................................... 1 3.0 Background ........................................................................................................................................... 1 4.0 Methodology ......................................................................................................................................... 2

265

U.S. Department of Energy, Richland Operations Office And CH2M HILL Plateau  

Broader source: Energy.gov (indexed) [DOE]

U.S. Department of Energy, Richland Operations Office And CH2M HILL U.S. Department of Energy, Richland Operations Office And CH2M HILL Plateau Remediation Company Partnering Charter For Partnering Performance Agreement U.S. Department of Energy, Richland Operations Office And CH2M HILL Plateau Remediation Company Partnering Charter For Partnering Performance Agreement The U.S. Department of Energy (DOE) Richland Operations Office (DOE-RL) and CH2M HILL Plateau Remediation Company (CHPRC) are committed to continuous improvement and will utilize principles of the DOE Environmental Management (DOE-EM) Partnering Policy to enhance teaming to further execute the Plateau Remediation Contract. U.S. Department of Energy, Richland Operations Office And CH2M HILL Plateau Remediation Company Partnering Charter For Partnering Performance Agreement

266

Contacts for Field Counsel Offices | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Field Counsel Offices Field Counsel Offices Contacts for Field Counsel Offices We welcome your comments and questions. Please click on an office below for a list of contacts: Chicago Office Integrated Support Center Office of Legal Services (OLS) at the Environmental Management Consolidated Business Center Golden Field Office Idaho Operations Office Oak Ridge Operations Office Richland Operations Office Savannah River Operations Office NNSA Service Center Strategic Petroleum Reserve CHICAGO OFFICE INTEGRATED SUPPORT CENTER- Office of the Chief Counsel A full list of contacts for the Chicago Office Integrated Support Center can be found HERE. Office of Legal Services (OLS) at the Environmental Management Consolidated Business Center (EMCBC) A full list of contacts for the EMCBC Office of Legal Services can be found

267

Independent Oversight Review, Richland Operations Office and CH2M Hill  

Broader source: Energy.gov (indexed) [DOE]

and CH2M and CH2M Hill Plateau Remediation Company and Mission Support Alliance - April 2012 Independent Oversight Review, Richland Operations Office and CH2M Hill Plateau Remediation Company and Mission Support Alliance - April 2012 April 2012 Review of Richland Operations Office and CH2M Hill Plateau Remediation Company and Mission Support Alliance Conduct of Operations The purpose of this independent oversight review by the U.S. Department of Energy (DOE) Office of Enforcement and Oversight, within the Office of Health, Safety and Security (HSS), was to observe and shadow1 a DOE Richland Operations Office (DOE-RL) assessment of its contractors at the Hanford Site. The HSS reviewer observed the implementation and effectiveness of the DOE-RL assessment of two of the contractors (CHPRC and

268

FY94 Office of Technology Development Mixed Waste Operations Robotics Demonstration  

SciTech Connect (OSTI)

The Department of Energy (DOE) Office of Technology Development (OTD) develops technologies to help solve waste management and environmental problems at DOE sites. The OTD includes the Robotics Technology Development Program (RTDP) and the Mixed Waste Integrated Program (MWIP). Together these programs will provide technologies for DOE mixed waste cleanup projects. Mixed waste contains both radioactive and hazardous constituents. DOE sites currently store over 240,000 cubic meters of low level mixed waste and cleanup activities will generate several hundred thousand more cubic meters. Federal and state regulations require that this waste must be processed before final disposal. The OTD RTDP Mixed Waste Operations (MWO) team held several robotic demonstrations at the Savannah River Site (SRS) during November of 1993. Over 330 representatives from DOE, Government Contractors, industry, and universities attended. The MWO team includes: Fernald Environmental Management Project (FEMP), Idaho National Engineering Laboratory (INEL), Lawrence Livermore National Laboratory (LLNL), Oak Ridge National Engineering Laboratory (ORNL), Sandia National Laboratory (SNL), and Savannah River Technology Center (SRTC). SRTC is the lead site for MWO and provides the technical coordinator. The primary demonstration objective was to show that robotic technologies can make DOE waste facilities run better, faster, more cost effective, and safer. To meet the primary objective, the demonstrations successfully showed the following remote waste drum processing activities: non-destructive drum examination, drum transportation, drum opening, removing waste from a drum, characterize and sort waste items, scarify metal waste, and inspect stored drums. To further meet the primary objective, the demonstrations successfully showed the following remote waste box processing activities: swing free crane control, workcell modeling, and torch standoff control.

Kriikku, E.M.

1994-08-30T23:59:59.000Z

269

Design and Operation of Fan-Coil Units in Using River Water as Chilled Water  

E-Print Network [OSTI]

Based on the case research for China's first central air conditioning system utilizing natural cool river water as chilled water, this paper analyzes the technical design-and-innovation process and operating characteristics of Fan-Coil Units (FCUs...

Jiang, A.; Chen, H.; Ma, W.; Zhu, H.

2006-01-01T23:59:59.000Z

270

U.S. Department of Energy, Oak Ridge Operations Office Nuclear Facility  

Broader source: Energy.gov (indexed) [DOE]

Energy, Oak Ridge Operations Office Nuclear Energy, Oak Ridge Operations Office Nuclear Facility Safety Basis Fundamentals Self-Study Guide [Fulfills ORO Safety Basis Competency 1, 2 (Part 1), or 7 (Part 1)] U.S. Department of Energy, Oak Ridge Operations Office Nuclear Facility Safety Basis Fundamentals Self-Study Guide [Fulfills ORO Safety Basis Competency 1, 2 (Part 1), or 7 (Part 1)] "This self-study guide provides an overview of safety basis terminology, requirements, and activities that are applicable to DOE and Oak Ridge Operations Office (ORO) nuclear facilities on the Oak Ridge Reservation. By completing this self-study guide, the reader will fulfill ORO Safety Basis Qualification Standard Competency 1, 2 (Part 1), or 7 (Part 1) and gain a familiarity level of knowledge regarding the following:

271

EA-1107: Construction and Operation of a Office Building at the Stanford  

Broader source: Energy.gov (indexed) [DOE]

7: Construction and Operation of a Office Building at the 7: Construction and Operation of a Office Building at the Stanford Linear Accelerator Center, Berkeley, California EA-1107: Construction and Operation of a Office Building at the Stanford Linear Accelerator Center, Berkeley, California SUMMARY This EA evaluates the environmental impacts of the proposed project to modify existing Building 51B at the U.S. Department of Energy's Lawrence Berkeley National Laboratory to install and conduct experiments on a new Induction Linear Accelerator System. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD September 8, 1995 EA-1107: Finding of No Significant Impact Construction and Operation of a Office Building at the Stanford Linear Accelerator Center September 8, 1995 EA-1107: Final Environmental Assessment

272

U.S. Department of Energy, Oak Ridge Operations Office Nuclear Facility  

Broader source: Energy.gov (indexed) [DOE]

U.S. Department of Energy, Oak Ridge Operations Office Nuclear U.S. Department of Energy, Oak Ridge Operations Office Nuclear Facility Safety Basis Fundamentals Self-Study Guide [Fulfills ORO Safety Basis Competency 1, 2 (Part 1), or 7 (Part 1)] U.S. Department of Energy, Oak Ridge Operations Office Nuclear Facility Safety Basis Fundamentals Self-Study Guide [Fulfills ORO Safety Basis Competency 1, 2 (Part 1), or 7 (Part 1)] "This self-study guide provides an overview of safety basis terminology, requirements, and activities that are applicable to DOE and Oak Ridge Operations Office (ORO) nuclear facilities on the Oak Ridge Reservation. By completing this self-study guide, the reader will fulfill ORO Safety Basis Qualification Standard Competency 1, 2 (Part 1), or 7 (Part 1) and gain a familiarity level of knowledge regarding the following:

273

Savannah River Operations Office; Interim Management of Nuclear Materials at the Savannah River Site  

Broader source: Energy.gov (indexed) [DOE]

474 474 Federal Register / Vol. 61, No. 179 / Friday, September 13, 1996 / Notices James R. Holbein, United States Secretary, NAFTA Secretariat, Suite 2061, 14th and Constitution Avenue, Washington, DC 20230, (202) 482-5438. SUPPLEMENTARY INFORMATION: On April 30, 1996 the Binational Panel issued its decision affirming in part and remanding in part the Final Determination in this matter. The Determination Remand was filed by the International Trade Administration on June 14, 1996. No challenge to that Redetermination on Remand was filed under Rule 73 of the Article 1904 Panel Rules. Therefore, pursuant to Rule 73(5) the Panel issued an Order on July 19, 1996 affirming the Redetermination on Remand and instructing the Secretariat to issue a Notice of Final Panel Action. The Notice of Final Panel Action was

274

Report on Inspection of the Performance Based Incentive Program at the Richland Operations Office, IG-0401  

Broader source: Energy.gov (indexed) [DOE]

(8-89) EFG (07-90) United States Government Department of Energy MEMORANDUM DATE: March 10, 1997 REPLY TO ATTN OF: IG-1 SUBJECT: INFORMATION: Report on "Inspection of the Performance Based Incentive Program at the Richland Operations Office" TO: The Acting Secretary BACKGROUND: The subject final report is provided for your information. While conducting other inspection work at the Richland Operations Office (Richland), the Office of Inspector General identified the Fiscal Year 1995 Richland Performance Based Incentive (PBI) Program as an area of concern. Specifically, we were unable to identify any

275

Savannah River Site - Reports  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Reports Reports Savannah River Site Review Reports 2013 Independent Oversight Review of the Savannah River Field Office Tritium Facilities Radiological Controls Activity-Level Implementation, November 2013 Independent Oversight Review of the Savannah River Site Salt Waste Processing Facility Safety Basis and Design Development, August 2013 Independent Oversight Review of the Employee Concerns Program at the Savannah River Operations Office, July 2013 Assessment of Nuclear Safety Culture at the Salt Waste Processing Facility Project, January 2013 Review of the Savannah River Site, Waste Solidification Building, Construction Quality of Mechanical Systems Installation and Selected Aspects of Fire Protection System Design, January 2013 Activity Reports 2013 Savannah River Site Waste Solidification Building Corrective Actions from the January 2013 Report on Construction Quality of Mechanical Systems Installation and Fire Protection Design, May 2013

276

Oversight Scheduling and Operational Awareness at the Savannah...  

Office of Environmental Management (EM)

Office of Safety and Emergency Management Evaluations Activity Report on Oversight Scheduling and Operational Awareness at the Savannah River Site Dates of Activity : 0325...

277

Columbia River System Operation Review : Final Environmental Impact Statement, Appendix D: Exhibits.  

SciTech Connect (OSTI)

The Columbia River and its tributaries are the primary water system in the Pacific Northwest, draining some 219,000 square miles in seven states and another 39,500 square miles in British Columbia. Beginning in the 1930`s, the Columbia River has been significantly modified by construction of 30 major dams on the river and its tributaries, along with dozens of non-Federal projects. Construction and subsequent operation of these water development projects have contributed to eight primary uses of the river system, including navigation, flood control, irrigation, electric power generation, fish migration, fish and wildlife habitat, recreation, and water supply and quality considerations. Increasing stress on the water development of the Columbia River and its tributaries has led primary Federal agencies to undertake intensive analysis and evaluation of the operation of these projects. These agencies are the U.S. Army Corps of Engineers and the Bureau of Reclamation, who operate the large Federal dams on the river, and the Bonneville Power Administration who sells the power generated at the dams. This review, termed the System Operation Review (SOR), has as its ultimate goal to define a strategy for future operation of the major Columbia River projects which effectively considers the needs of all river uses. This volume, Appendix D: Cultural resources appendix, Technical imput includes the following: Development of geomorphology based framework for cultural resources management, Dworshak Reservoir, Idaho; Impact profiles for SOR reservoirs; comments from the following Native American tribes: Burns Paiute Tribe; Coville Confederated Tribes; Confederated Tribes of the Warm Springs Indian Reservation; Confederated Tribes and bands of the Yakama Indian Nation (comments); Nez Perce Tribe; Coeur D`Alene Tribe; Spokane Tribe of Indians; The confederated Tribes of the Umatilla Indian Reservation.

Columbia River System Operation Review (U.S.)

1995-11-01T23:59:59.000Z

278

Columbia River System Operation Review : Final Environmental Impact Statement, Appendix N: Wildlife.  

SciTech Connect (OSTI)

The Columbia River System is a vast and complex combination of Federal and non-Federal facilities used for many purposes including power production, irrigation, navigation, flood control, recreation, fish and wildlife habitat and municipal and industrial water supply. Each river use competes for the limited water resources in the Columbia River Basin. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The environmental impact statement (EIS) itself and some of the other appendices present analyses of the alternative approaches to the other three decisions considered as part of the SOR. This document is the product of the Wildlife Work Group, focusing on wildlife impacts but not including fishes. Topics covered include the following: scope and process; existing and affected environment, including specific discussion of 18 projects in the Columbia river basin. Analysis, evaluation, and alternatives are presented for all projects. System wide impacts to wildlife are also included.

Columbia River System Operation Review (U.S.)

1995-11-01T23:59:59.000Z

279

Report on Audit of the Department of Energy Program Offices' Use of Management and Operating Contractor Employees, IG-0392  

Broader source: Energy.gov (indexed) [DOE]

U.S. DEPARTMENT OF ENERGY OFFICE OF INSPECTOR GENERAL OFFICE OF AUDIT SERVICES AUDIT OF THE DEPARTMENT OF ENERGY PROGRAM OFFICES' USE OF MANAGEMENT AND OPERATING CONTRACTOR EMPLOYEES The Office of Inspector General wants to make the distrution of its reports as customer friendly and cost effective as possible. Therefore, this report will be available electronically through the

280

Operations Program Management (OPM) Homepage | U.S. DOE Office...  

Office of Science (SC) Website

Information Operations Program Management U.S. Department of Energy SC-33Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-8429 F: (301)...

Note: This page contains sample records for the topic "river operations office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Final Environmental Impact Statement (Supplement to ERDA-1537, September 1977) Waste Management Operations Double-Shell Tanks for Defense High-Level Radioactive Waste Storage Savannah River Plant  

Broader source: Energy.gov (indexed) [DOE]

Do Do E/EIS-0062 FINAL ENVIRONMENTAL IMPACT mATEIUIENT (Supplement to ERDA-1537, September 1977) Waste ~ Management Operations Savannah River Plant ! Aiken, South Carolina Double-Shell Tanks for Defense High-Level Radioactive Waste Storage April 1980 U.S. DEPARTMENT OF ENERGY WASHINGTON. D.C.20545 1980 WL 94273 (F.R.) NOTICES DEPARTMENT OF ENERGY Office of Deputy Assistant Secretary for Nuclear Waste Management Double-Shell Tanks for Defense High-Level Radioactive Waste Storage, Savannah River Plant, Aiken, S.C. Wednesday, July 9, 1980 *46154 Record of Decision Decision. The decision has been made to complete the construction of the 14 double-shell tanks and use them to store defense high-level radioactive waste at the Savannah River Plant (SRP). Background. The SRP, located near Aiken, South Carolina, is a major installation of the

282

EIS-0108: L-Reactor Operation, Savannah River Plant, Aiken, South Carolina  

Broader source: Energy.gov [DOE]

This Environmental Impact Statement (EIS) was prepared to provide environmental input into the proposed decision to restart L-Reactor operation at the Savannah River Plant (SRP). The Savannah River Plant is a major U.S. Department of Energy (DOE) installation for the production of defense nuclear materials. The proposed restart of LReactor would provide defense nuclear materials (i.e. , plutonium) to wet current and near-term needs for national defense purposes.

283

Review of Richland Operations Office and CH2M Hill Plateau Remediation Company and Mission Support Alliance Conduct of Operations, April 2012  

Broader source: Energy.gov (indexed) [DOE]

Oversight Review of Oversight Review of Richland Operations Office and CH2M HILL Plateau Remediation Company and Mission Support Alliance Conduct of Operations April 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................... 1 2.0 Background ............................................................................................................................................ 1 3.0 Scope ...................................................................................................................................................... 2

284

Review of Richland Operations Office and CH2M Hill Plateau Remediation Company and Mission Support Alliance Conduct of Operations, April 2012  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Independent Oversight Review of Independent Oversight Review of Richland Operations Office and CH2M HILL Plateau Remediation Company and Mission Support Alliance Conduct of Operations April 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................... 1 2.0 Background ............................................................................................................................................ 1 3.0 Scope ...................................................................................................................................................... 2

285

Site Familiarization and Introduction of New Office of Safety and Emergency Management Evaluations Site Lead for the Office of River Protection Waste Treatment Plant and Tank Farms, February 2013  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

HIAR-HANFORD-2013-02-25 HIAR-HANFORD-2013-02-25 Site: Hanford - Office of River Production Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for Site Familiarization and Introduction of New Office of Safety and Emergency Management Evaluations Site Lead Dates of Activity : 02/25/13 - 03/07/13 and 03/18-28/13 Report Preparer: Robert E. Farrell Activity Description/Purpose: The Office of Health, Safety and Security's (HSS) Office of Safety and Emergency Management Evaluations (HS-45) assigned a new Site Lead to provide continuous oversight of activities at the Office of River Protection (ORP) Waste Treatment Plant (WTP) and tank farms. To gain familiarity with the site programs and personnel, the new Site Lead made

286

Site Familiarization and Introduction of New Office of Safety and Emergency Management Evaluations Site Lead for the Office of River Protection Waste Treatment Plant and Tank Farms, February 2013  

Broader source: Energy.gov (indexed) [DOE]

HIAR-HANFORD-2013-02-25 HIAR-HANFORD-2013-02-25 Site: Hanford - Office of River Production Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for Site Familiarization and Introduction of New Office of Safety and Emergency Management Evaluations Site Lead Dates of Activity : 02/25/13 - 03/07/13 and 03/18-28/13 Report Preparer: Robert E. Farrell Activity Description/Purpose: The Office of Health, Safety and Security's (HSS) Office of Safety and Emergency Management Evaluations (HS-45) assigned a new Site Lead to provide continuous oversight of activities at the Office of River Protection (ORP) Waste Treatment Plant (WTP) and tank farms. To gain familiarity with the site programs and personnel, the new Site Lead made

287

Field Operations Organization | U.S. DOE Office of Science (SC)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Field Operations Organization Field Operations Organization Deputy Director for Field Operations Deputy Director Home Mission & Functions Deputy Director Biography Organization Organization Chart .pdf file (77KB) Field Offices Laboratory Policy and Evaluation (LPE) Safety, Security and Infrastructure (SSI) Oversight Operations Improvement Committee Contact Information Deputy Director for Field Operations U.S. Department of Energy SC-3/Forrestal Building 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5434 F: (202) 586-4120 E: sc.science@science.doe.gov Field Operations Organization Print Text Size: A A A RSS Feeds FeedbackShare Page Field Operations is led by Deputy Director Joseph McBrearty and consists of three major elements - Site Offices, a Support Center, and Headquarters

288

Audit of the Richland Operations Office Site Characterization Program, IG-0368  

Broader source: Energy.gov (indexed) [DOE]

0, 1995 0, 1995 IG-1 INFORMATION: Report on "Audit of the Richland Operations Office Site Characterization Program" The Secretary BACKGROUND: With its designation as an environmental cleanup site in 1989, the Hanford Site has represented a major activity of the Department of Energy (Department). The final cleanup of this site is estimated to take over 50 years and cost close to $100 billion. Although there are many factors influencing the operations at Hanford, the Department and the Richland Operations Office (Richland) are ultimately responsible for its success. The Department and Richland are responsible for establishing procedures that ensure program goals are accomplished using the most cost-effective methods. DISCUSSION:

289

Unesco Science Co-operation Office for Latin America  

Science Journals Connector (OSTI)

... As an outcome of the Latin-American conference for the development of science, held in Montevideo in September 1948, the Unesco ... , held in Montevideo in September 1948, the Unesco Science Co-operation ...

1950-05-27T23:59:59.000Z

290

EA-1906: Operations, Consolidation, and Upgrades at the Office of Secure  

Broader source: Energy.gov (indexed) [DOE]

6: Operations, Consolidation, and Upgrades at the Office of 6: Operations, Consolidation, and Upgrades at the Office of Secure Transportation Western Command Site, Albuquerque, NM EA-1906: Operations, Consolidation, and Upgrades at the Office of Secure Transportation Western Command Site, Albuquerque, NM Summary This EA evaluates environmental impacts associated with the siting and construction of several proposed buildings, including a new vehicle maintenance facility and mobile equipment maintenance building (and their support structures) at the Western Command Site, Albuquerque, NM. Public Comment Opportunities None available at this time. Documents Available for Download July 10, 2012 EA-1906: Finding of No Significant Impact Operations, Upgrades, and Consolidation at the Western Command Site, NM July 10, 2012 EA-1906: Final Environmental Assessment

291

CERCLA Preliminary Assessment of DOE'S Nevada Operations Office Nuclear Weapons Testing  

Office of Legacy Management (LM)

tudies/B ackground tudies/B ackground Book 1 CERCLA Preliminary Assessment of DOE'S Nevada Operations Office Nuclear Weapons Testing Areas Vol. 11, April 1988 DISCLAIMER Portions of this document may be illegible in electronic image products. Images are produced from the best available original document. CERCLA PRELIMINARY ASSESSMENT OF DOE'S NEVADA OPERATIONS OFFICE WCILEAR WEAPONS T E S r n G AREAS Prepared by Water Resources Center Desert Research Institute University of Nevada System ,Prepared for U . S . Department of Energy Nevada Operations Office Las Vegas, Nevada under contract DE-AC08-85NV10384 A p r i l 1988 CONTENTS VOLUME I I. INTRODUCTION 1.1 11. NEVADA TEST SITE TESTING AREAS 2.1 Frenchman Flat (Area 5) 2.1.1 2.2 Yucca Flat (Areas 1, 2, 3, 4, 6, 7, 8, 9, 10, 11, and 15)

292

U.S. Department of Energy, Richland Operations Office And CH2M HILL Plateau  

Broader source: Energy.gov (indexed) [DOE]

CH2M HILL CH2M HILL Plateau Remediation Company Partnering Charter For Partnering Performance Agreement U.S. Department of Energy, Richland Operations Office And CH2M HILL Plateau Remediation Company Partnering Charter For Partnering Performance Agreement The U.S. Department of Energy (DOE) Richland Operations Office (DOE-RL) and CH2M HILL Plateau Remediation Company (CHPRC) are committed to continuous improvement and will utilize principles of the DOE Environmental Management (DOE-EM) Partnering Policy to enhance teaming to further execute the Plateau Remediation Contract. U.S. Department of Energy, Richland Operations Office And CH2M HILL Plateau Remediation Company Partnering Charter For Partnering Performance Agreement More Documents & Publications CH2M HILL Plateau Remediation Company

293

DOE/EIS-0236, Oakland Operations Office, National Ignition Facility Final  

Broader source: Energy.gov (indexed) [DOE]

DOE/EIS-0236, Oakland Operations Office, National Ignition Facility DOE/EIS-0236, Oakland Operations Office, National Ignition Facility Final Supplemental Environmental Impact Statement to the Stockpile Stewardship and Management Programmatic Environmental Impact Statement Volume II: Response to Public Comments (January 2 DOE/EIS-0236, Oakland Operations Office, National Ignition Facility Final Supplemental Environmental Impact Statement to the Stockpile Stewardship and Management Programmatic Environmental Impact Statement Volume II: Response to Public Comments (January 2 DOE issued the Draft SEIS for public review and comment by mailings to stakeholders and by announcements in the Federal Register (FR) on November 5, 1999, (64 FR 60430) (Attachment 4 of Volume I) and on November 12, 1999 (64 FR 61635) correcting a document title (Attachment 5 of Volume I). On

294

U.S. Department of Energy, Richland Operations Office And Mission Support  

Broader source: Energy.gov (indexed) [DOE]

Mission Mission Support Alliance, LLC Partnering Charter For Partnering Performance Agreement U.S. Department of Energy, Richland Operations Office And Mission Support Alliance, LLC Partnering Charter For Partnering Performance Agreement The U.S. Department of Energy, Richland Operations Office (DOE-RL) and the Mission Support Alliance, LLC (MSA) are committed to continuous improvement and will partner together to enchance teaming to further execute the Mission Support Contract. This focused partnership is intended to improve the mission of the Hanford Site cleanup, emphasizing project safety, compliance and delivery completed on time and within cost. U.S. Department of Energy, Richland Operations Office And Mission Support Alliance, LLC Partnering Charter For Partnering Performance Agreement

295

Department of Energy - Idaho Operations Office FY-2013 and Beyond Strategic Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

- Idaho Operations Office - Idaho Operations Office FY-2013 and Beyond Strategic Plan Introduction The Department of Energy Idaho Operations Office (DOE-ID) 2013 Strategic Plan and Beyond outlines the Federal workforce mission, vision, strategies, objectives, responsibilities, and expectations that will sustain the successful accomplishment of the Idaho National Laboratory (INL) Site mission. DOE-ID's Strategic Plan is aligned with the DOE Headquarters Strategic Plan and DOE-ID's efforts toward becoming an internationally recognized world class laboratory. By implementing this Strategic Plan, DOE-ID is playing an important supporting role in achieving DOE's overall mission to ensure America's security and prosperity by addressing its energy, environmental, and nuclear challenges through transformative science and

296

Oversight Reports - Savannah River Site | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Savannah River Site Savannah River Site Oversight Reports - Savannah River Site September 4, 2013 Independent Oversight Review, Savannah River Site Salt Waste Processing Facility - August 2013 Review of the Savannah River Site Salt Waste Processing Facility Safety Basis and Design Development. August 5, 2013 Independent Oversight Review, Savannah River Operations Office - July 2013 Review of the Employee Concerns Program at the Savannah River Operations Office July 25, 2013 Independent Oversight Activity Report, Savannah River Site Waste Solidification Building Savannah River Site Waste Solidification Building Corrective Actions from the January 2013 Report on Construction Quality of Mechanical Systems Installation and Fire Protection Design [HIAR SRS-2013-5-07] April 22, 2013 Independent Activity Report, Savannah River Site - March 2013

297

Business Policy and Operations Homepage | U.S. DOE Office of Science (SC)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Organization » BPO Home Organization » BPO Home Business Policy and Operations (BPO) BPO Home Leadership Organization Chart .pdf file (195KB) Business Management and Planning (BMP) Division SC Systems and Operations (SCSO) Division Contact Information Business Policy & Operations U.S. Department of Energy SC-45/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-0192 F: (301) 903-2481 More Information » Print Text Size: A A A Subscribe FeedbackShare Page The Office of Business Policy and Operations (BPO) is the provider of information technology and information resource services for systems supporting the DOE Office of Science (SC) Headquarters. We are a focused group committed to implementing the organization's strategic and operating plans, and helping our customers accelerate business innovation through

298

Daily/Hourly Hydrosystem Operation : How the Columbia River System Responds to Short-Term Needs.  

SciTech Connect (OSTI)

The System Operation Review, being conducted by the Bonneville Power Administration, the US Army Corps of Engineers, and the US Bureau of Reclamation, is analyzing current and potential future operations of the Columbia River System. One goal of the System Operations Review is to develop a new System Operation Strategy. The strategy will be designed to balance the many regionally and nationally important uses of the Columbia River system. Short-term operations address the dynamics that affect the Northwest hydro system and its multiple uses. Demands for electrical power and natural streamflows change constantly and thus are not precisely predictable. Other uses of the hydro system have constantly changing needs, too, many of which can interfere with other uses. Project operators must address various river needs, physical limitations, weather, and streamflow conditions while maintaining the stability of the electric system and keeping your lights on. It takes staffing around the clock to manage the hour-to-hour changes that occur and the challenges that face project operators all the time.

Columbia River System Operation Review (U.S.)

1994-02-01T23:59:59.000Z

299

How Run-of-River Operation Affects Hydropower Generation Henriette I. Jager Mark S. Bevelhimer  

E-Print Network [OSTI]

How Run-of-River Operation Affects Hydropower Generation and Value Henriette I. Jager ? Mark S) are mandated to protect aquatic biota, (2) decrease hydropower generation per unit flow, and (3) decrease energy revenue. We tested these three assump- tions by reviewing hydropower projects with license

Jager, Henriette I.

300

Office of Headquarters Security Operations: Questions and Answers on the  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Questions and Answers on the New Access Control System at DOE Headquarters Questions and Answers on the New Access Control System at DOE Headquarters Q1 Why is the current access control system to security areas being changed? Q2 How is the new access control system different from the existing one? Q3 Who is affected? Q4 When will the new proximity card readers be installed? Q5 How will affected personnel at DOE HQ be notified about the installation of the proximity card readers that will affect their access to the HQ facilities and security areas, and the actions they will be required to take to assure their HSPD-12 badge will operate in the new readers? Q6 What will DOE HQ "Q" and "L" badged employees need to do? Q7 Will all DOE HQ security areas be changed out to the new access control system at the same time?

Note: This page contains sample records for the topic "river operations office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Independent Activity Report, Savannah River Site - September 2010 |  

Broader source: Energy.gov (indexed) [DOE]

September 2010 September 2010 Independent Activity Report, Savannah River Site - September 2010 Savannah River Site Salt Waste Processing Facility Effectiveness Review The U.S. Department of Energy (DOE), Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), participated in the DOE Savannah River Operations Office (DOE-SR), Salt Waste Processing Facility Project Office (SWPFPO), Salt Waste Processing Facility (SWPF) Integrated Safety Management System (ISMS) Effectiveness Review. The HSS participation, through its Site Lead program, provided HSS with an opportunity to maintain operational awareness and evaluate site programs, while supporting DOE line management efforts to safely and securely accomplish their missions. The onsite review was conducted during the

302

Conduct Operations Assessment Plan - Developed By NNSA/Nevada Site Office Independent Oversight Division  

Broader source: Energy.gov (indexed) [DOE]

August 2003 - Conduct of Operations (Programmatic Implementation) August 2003 - Conduct of Operations (Programmatic Implementation) Utilize Conduct of Operations - 5480.19 Utilize BN PD-0021.001 - Formality of Operations Utilize LLNL, LANL comparable documents (WSS) Requirements matrix at the senior management level Flow-down of requirements into facilities VALUE ADDED FOR: AMTS Contractor Assurance Focus Area AMTS ISM Improvements Focus Area AMTS Nuclear Operations Focus Area AMTS Performance Assurance Division AMNS Programs CONDUCT OF OPERATIONS Assessment Plan NNSA/Nevada Site Office Independent Oversight Division Performance Objective: The purpose of this assessment is to verify programmatic implementation of DOE O 5480.19, "Conduct of Operations Requirements of DOE Facilities" Criteria: Operations at DOE facilities shall be conducted in a manner to assure an

303

Safety analysis, 200 Area, Savannah River Plant: Separations area operations  

SciTech Connect (OSTI)

The nev HB-Line, located on the fifth and sixth levels of Building 221-H, is designed to replace the aging existing HB-Line production facility. The nev HB-Line consists of three separate facilities: the Scrap Recovery Facility, the Neptunium Oxide Facility, and the Plutonium Oxide Facility. There are three separate safety analyses for the nev HB-Line, one for each of the three facilities. These are issued as supplements to the 200-Area Safety Analysis (DPSTSA-200-10). These supplements are numbered as Sup 2A, Scrap Recovery Facility, Sup 2B, Neptunium Oxide Facility, Sup 2C, Plutonium Oxide Facility. The subject of this safety analysis, the, Plutonium Oxide Facility, will convert nitrate solutions of {sup 238}Pu to plutonium oxide (PuO{sub 2}) powder. All these new facilities incorporate improvements in: (1) engineered barriers to contain contamination, (2) barriers to minimize personnel exposure to airborne contamination, (3) shielding and remote operations to decrease radiation exposure, and (4) equipment and ventilation design to provide flexibility and improved process performance.

Perkins, W.C.; Lee, R.; Allen, P.M.; Gouge, A.P.

1991-07-01T23:59:59.000Z

304

Type B Accident Investigation Board Report on the September 1, 1999, Plutonium Intakes at the Savannah River Site FB-Line  

Broader source: Energy.gov [DOE]

This report is an independent product of the Type B Accident Investigation Board appointed by Greg Rudy, Manager, Savannah River Operations Office, U.S. Department of Energy.

305

Independent Activity Report, Savannah River Site - March 2013 | Department  

Broader source: Energy.gov (indexed) [DOE]

Savannah River Site - March 2013 Savannah River Site - March 2013 Independent Activity Report, Savannah River Site - March 2013 March 2013 Oversight Scheduling an Operational Awareness at the Savannah River Site [HIAR-SRS-2013-03-25] Activity Description/Purpose: The Independent Oversight Site Lead for the Savannah River Site traveled to the site to work with functional area managers to schedule nuclear safety oversight activities. The Site Lead reviewed the differing professional opinion (DPO) program at the Savannah River Operations Office (Department of Energy (DOE)-SR). Independent Activity Report, Savannah River Site - March 2013 More Documents & Publications Independent Oversight Review, Savannah River Operations Office - July 2013 Policy Flash 2013-74 Quarterly Notification of the DOE's Differing

306

Independent Activity Report, Savannah River Remediation - July 2010 |  

Broader source: Energy.gov (indexed) [DOE]

Remediation - July 2010 Remediation - July 2010 Independent Activity Report, Savannah River Remediation - July 2010 July 2010 Savannah River Operations Office Integrated Safety Management System Phase II Verification Review of Savannah River Remediation The U.S. Department of Energy (DOE), Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), participated in the DOE Savannah River Operations Office (DOE-SR), Office of Safety and Quality Assurance (OSQA), Technical Support Division (TSD) Integrated Safety Management System (ISMS), Phase II Verification of Savannah River Remediation (SRR). The purpose of the DOE-SR Phase II ISMS Verification was to verify that the SRR ISMS Description that was submitted to and approved by the DOE-SR Manager is being effectively implemented at the Savannah

307

Operations Improvement Committee | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Operations Improvement Committee Operations Improvement Committee Deputy Director for Field Operations Deputy Director Home Mission & Functions Deputy Director Biography Organization Oversight Operations Improvement Committee Contact Information Deputy Director for Field Operations U.S. Department of Energy SC-3/Forrestal Building 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5434 F: (202) 586-4120 E: sc.science@science.doe.gov Operations Improvement Committee Print Text Size: A A A RSS Feeds FeedbackShare Page The U.S. Department of Energy's Office of Science (SC)-the lead federal agency supporting fundamental scientific research for energy and the Nation's largest supporter of basic research in the physical sciences-has two principal thrusts: direct support of scientific research and direct

308

Walla Walla River Fish Passage Operations Project : Annual Progress Report October 2007 - September 2008.  

SciTech Connect (OSTI)

In the late 1990s, the Confederated Tribes of the Umatilla Indian Reservation, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife, along with many other agencies, began implementing fisheries restoration activities in the Walla Walla Basin. An integral part of these efforts is to alleviate the inadequate fish migration conditions in the basin. Migration concerns are being addressed by removing diversion structures, constructing fish passage facilities, implementing minimum instream flow requirements, and providing trap and haul efforts when needed. The objective of the Walla Walla River Fish Passage Operations Project is to increase the survival of migrating adult and juvenile salmonids in the Walla Walla River basin. The project is responsible for coordinating operation and maintenance of ladders, screen sites, bypasses, trap facilities, and transportation equipment. In addition, the project provides technical input on passage and trapping facility design, operation, and criteria. Operation of the various passage facilities and passage criteria guidelines are outlined in an annual operations plan that the project develops. Beginning in March of 2007, two work elements from the Walla Walla Fish Passage Operations Project were transferred to other projects. The work element Enumeration of Adult Migration at Nursery Bridge Dam is now conducted under the Walla Walla Basin Natural Production Monitoring and Evaluation Project and the work element Provide Transportation Assistance is conducted under the Umatilla Satellite Facilities Operation and Maintenance Project. Details of these activities can be found in those project's respective annual reports.

Bronson, James P.; Duke, Bill; Loffink, Ken

2008-12-30T23:59:59.000Z

309

Environmental Assessment for the Replacement Source of Steam for A Area at the Savannah River Site  

Broader source: Energy.gov (indexed) [DOE]

8 8 OCTOBER 2006 U. S. DEPARTMENT OF ENERGY SAVANNAH RIVER OPERATIONS OFFICE SAVANNAH RIVER SITE ENVIRONMENTAL ASSESSMENT FOR THE REPLACEMENT SOURCE OF STEAM FOR A AREA AT THE SAVANNAH RIVER SITE DOE/EA-1568 ENVIRONMENTAL ASSESSMENT FOR THE REPLACEMENT SOURCE OF STEAM FOR A AREA AT THE SAVANNAH RIVER SITE OCTOBER 2006 U. S. DEPARTMENT OF ENERGY SAVANNAH RIVER OPERATIONS OFFICE SAVANNAH RIVER SITE ii TABLE OF CONTENTS Page 1.0 INTRODUCTION ...............................................................................................1 1.1 Background ..............................................................................................1 1.2 Purpose and Need for Proposed Action.....................................................1 2.0 PROPOSED ACTION AND ALTERNATIVES

310

DOE/EA-1606 ENVIRONMENTAL ASSESSMENT FOR THE PROPOSED USE OF SAVANNAH RIVER  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

EA-1606 EA-1606 ENVIRONMENTAL ASSESSMENT FOR THE PROPOSED USE OF SAVANNAH RIVER SITE LANDS FOR MILITARY TRAINING December 2011 U.S. DEPARTMENT OF ENERGY SAVANNAH RIVER OPERATIONS OFFICE SAVANNAH RIVER SITE DOE/EA-1606 ENVIRONMENTAL ASSESSMENT FOR THE PROPOSED USE OF SAVANNAH RIVER SITE LANDS FOR MILITARY TRAINING December 2011 U.S. DEPARTMENT OF ENERGY SAVANNAH RIVER OPERATIONS OFFICE SAVANNAH RIVER SITE ii This page is intentionally left blank iii TABLE OF CONTENTS PAGE 1.0 INTRODUCTION ...................................................................................................1 1.1 Background ..................................................................................................1 1.2 Purpose and Need for Action .......................................................................3

311

Process centrifuge operating problems and equipment failures in canyon reprocessing facilities at the Savannah River Site  

SciTech Connect (OSTI)

The Savannah River Laboratory (SRL) maintains a compilation of operating problems and equipment failures that have occurred in the fuel reprocessing areas of the Savannah River Site (SRS). At present, the data bank contains more than 230,000 entries ranging from minor equipment malfunctions to incidents with the potential for injury or contamination of personnel, or for economic loss. The data bank has been used extensively for a wide variety of purposes, such as failure analyses, trend analyses, and preparation of safety analyses. Typical of the data are problems associated with the canyon process centrifuges. This report contains a compilation of the centrifuge operating problems and equipment failures primarily as an aid to organizations with related equipment. Publication of these data was prompted by a number of requests for this information by other Department of Energy (DOE) sites. 11 refs., 2 figs., 4 tabs.

Durant, W.S.; Baughman, D.F.

1990-03-01T23:59:59.000Z

312

Columbia River System Operation Review : Final Environmental Impact Statement, Main Report.  

SciTech Connect (OSTI)

The System Operation Review (SOR) Final EIS addresses four actions: (a) need to develop coordinated strategy for managing the multiple uses of the Federal Columbia River system (System Operating Strategy [SOS]); (b) need to provide interested parties other than management agencies with a long-term role in system planning (Forum); (c) need to renew or change current Canadian Entitlement Allocation Agreements (CEAA); and (d) need to renegotiate and renew the Pacific Northwest Coordination Agreement (PNCA). SOS alternatives analyzed are: (1) operation prior to Endangered Species Act listings of salmon stocks; (2) current operations (no action); (3) stable storage project operation; (4) natural river operation; (5) fixed drawdown; (6) operating strategies proposed by the U.S. Fish and Wildlife Service, National Marine Fisheries Service, State fisheries agencies, Native American tribes, and Federal operating agencies; and (7) Preferred Alternative. The seven Forum alternatives analyzed are: (1) decisionmaking by the SOR lead agencies (preferred alternative); (2) decisionmaking by SOR lead agencies and recommendations by an existing regional entity; (3) decisionmaking by SOR lead agencies and recommendations by a new regional entity; (4) decisionmaking by a Federal consultation forum; (5) decisionmaking by a new entity; (6) decisionmaking by one Federal operating agency; (7) decisionmaking by a Federal agency other than an operating agency. PNCA alternatives analyzed are: (1) no replacement contract; (2) contract to maximize regional power benefits; (3) roll over existing PNCA; (4) current PNCA with modified operating procedures (preferred alternative); (5) current PNCA with nonpower modifications. CEAA alternatives include: (1) no action (no replacement of current allocation agreements); (2) entitlement allocation: 55 percent Federal; 45 percent non-Federal; (3) entitlement allocation: 70 percent Federal, 30 percent non-Federal (preferred alternative); (4) no agreement.

Columbia River System Operation Review (U.S.); United States. Bonneville Power Administration; United States. Army. Corps of Engineers. North Pacific Division; United States. Bureau of Reclamation. Pacific Northwest Region.

1995-11-01T23:59:59.000Z

313

Columbia River System Operation Review : Final Environmental Impact Statement, Appendix R: Pacific Northwest Coordination agreement (PNCA).  

SciTech Connect (OSTI)

Currently, the Federal government coordinates the planning and operation of the Federal Columbia River Power System (FCRPS) with projects owned and operated by the region`s non-Federal hydrogenerating utilities pursuant to the Pacific North-west Coordination Agreement (PNCA). The Bureau of Reclamation (Reclamation), the Corps of Engineers (Corps), and the Bonneville Power Administration (BPA) are parties to the PNCA on behalf of the government of the United States. The PNCA is a complex agreement that provides an opportunity for the region`s power producers to maximize the power system`s reliability and economy while meeting their multiple-use objectives. The PNCA does not dictate the operation of the resources it coordinates. It is essentially an accounting mechanism that exchanges the power produced among the parties in order to improve the reliability of the system and reduce regional power costs. Project owners retain complete autonomy to operate as needed to meet their multiple-use requirements. The PNCA was executed in 1964 as an important component of regional plans to maximize the Northwest`s hydro resource capability. Maximization also included the development of storage projects on the Columbia River in Canada pursuant to the terms of the 1964 Columbia River Treaty. Because of the link between power coordination and Treaty issues, the current parties to the PNCA, currently are contemplating entering into a replacement or renewed power coordination agreement. Because the power coordination agreement is a consensual arrangement, its ultimate provisions must be acceptable to all of its signatories. This Appendix R to the Final Environmental Impact Statement of the Columbia River System is a presentation of the Pacific North-west Coordination Agreement.

Columbia River System Operation Review (U.S.)

1995-11-01T23:59:59.000Z

314

ENERGY RESEARCH AND DEVELOPMENT ADMlNlSTRATldN CHICAGO OPERATIONS OFFICE  

Office of Legacy Management (LM)

RESEARCH AND DEVELOPMENT ADMlNlSTRATldN RESEARCH AND DEVELOPMENT ADMlNlSTRATldN CHICAGO OPERATIONS OFFICE 9999 SOUTH CASS AVENUE - .~-- ARGONNE, ILL!&+ bt.499 _ In Reply Refer TO: SEP. 1 61975 Martin B. Biles, Director Division of Operational Safety, HQ CARNEGIE-MELLON UNIVERSITY (CMU) CYCLOTRON DISMANTLING PROJECT The purpose of this memorandum is to summarize the dismantling activities which have been performed or are planned at the CMU, Nuclear Research Center, Saxonburg, Pennsylvania, site for purposes of preparing the site for unrestricted release from a radiological standpoint. Facility Description and Background Attachment 1 shows a schematic of the main building (which housed the synchrocyclotron, laboratories, machine shop, and offices) and adjacent ancillary facilities. Not shown (direction of location shown by arrows)

315

Audit of the Contractor Incentive Program at the Nevada Operations Office, IG-0412  

Broader source: Energy.gov (indexed) [DOE]

20, 1997 20, 1997 MEMORANDUM FOR THE SECRETARY FROM: John C. Layton Inspector General SUBJECT: INFORMATION: Report on "Audit of the Contractor Incentive Program at the Nevada Operations Office" BACKGROUND: The Department of Energy (Department) is using performance-based contracts to address problems associated with its traditional management and operating contracts. Under this approach, contractor performance is to be evaluated against performance measures which are clearly stated, results-oriented, and established prior to performance. The performance measures, which reflect the Department's expectations of the contractor, are the basis for rewarding superior contractor performance

316

DOE to Extend Savannah River Nuclear Solutions Contract at Savannah River  

Broader source: Energy.gov (indexed) [DOE]

to Extend Savannah River Nuclear Solutions Contract at Savannah to Extend Savannah River Nuclear Solutions Contract at Savannah River Site to September 2016 DOE to Extend Savannah River Nuclear Solutions Contract at Savannah River Site to September 2016 September 6, 2012 - 12:00pm Addthis Media Contact Bill Taylor 803-952-8564 bill.taylor@srs.gov Aiken, SC -- The Department of Energy's (DOE) Savannah River Operations Office today exercised its option to extend the current Savannah River Site Management and Operating contract with Savannah River Nuclear Solutions, LLC (SRNS) for an additional 38 months, from August 1, 2013 to September 2016. The SRNS contract was competatviely awareded January 10, 2008. The total value of the SRNS contract with the extension is approximately $8 billion. The current contract provides for management and operations of Savannah

317

US Department of Energy, Bonneville Power Administration US Army Corps of Engineers, North Pacific Division Columbia River System Operation Review Canadian Entitlement Allocation Extension Agreements Record of Decision; April 29, 1997  

Broader source: Energy.gov (indexed) [DOE]

Columbia River System Operation Review Columbia River System Operation Review Final Environmental Impact Statement Canadian Entitlement Allocation Extension Agreements Record of Decision Summary The Administrator and Chief Executive Officer (CEO) of the Bonneville Power Administration (BPA), acting for BPA, and, as Chairman of the United States Entity (the Administrator and the Division Engineer, North Pacific Division of the United States Army Corps of Engineers), acting on behalf of the United States Entity, has decided to adopt for the Canadian Entitlement Allocation Extension Agreements (CEAEA) a federal hydroelectric projects allocation of 72.5 percent and a non-Federal hydroelectric projects allocation of 27.5 percent. The Columbia River Treaty (Treaty), ratified in 1964, required the construction of three

318

EIS-0217: Savannah River Site Waste Management | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

17: Savannah River Site Waste Management 17: Savannah River Site Waste Management EIS-0217: Savannah River Site Waste Management Summary This EIS evaluates the potential environmental impacts and costs of storing, treating, and/or disposing of liquid high-level radioactive, low-level radioactive, hazardous, mixed (radioactive and hazardous), and transuranic wastes at SRS. Public Comment Opportunities None available at this time. Documents Available for Download June 28, 2001 EIS-0217: Amended Record of Decision Savannah River Site Waste Management, Savannah River Operations Office, Aiken, South Carolina May 19, 1997 EIS-0217: Supplemental Record of Decision Savannah River Site Waste Management May 19, 1997 EIS-0217: Supplemental Record of Decision Savannah River Site Waste Management, Savannah River Operations Office,

319

Sluiceway Operations to Pass Juvenile Salmonids at The Dalles Dam, Columbia River, USA  

SciTech Connect (OSTI)

Existing ice and trash sluiceways are commonly used to pass juvenile salmonids downstream at hydropower dams through a benign, non-turbine route. At The Dalles Dam on the Columbia River, managers undertook optimizing operations of sluiceway weirs to maximize survival of juvenile salmonids at the powerhouse. We applied fixed-location hydroacoustic methods to compare fish passage rates and sluiceway efficiencies for two weir configurations during 2004 and 2005: three weirs versus six weirs, located at the mid- versus east powerhouse, respectively. We also analyzed horizontal distributions of passage at the sluiceway and turbines and the effects of operating turbines beneath open sluiceway gates to provide supporting data relevant to operations optimization. Based on the findings, we recommend the following for long-term operations for the sluiceway at The Dalles Dam: open six rather than three sluiceway weirs to take advantage of the maximum hydraulic capacity of the sluiceway; open the three weirs above the western-most operating main turbine unit (MU) and the three weirs at MU 8 where turbine passage rates are relatively high; operate the turbine units below open sluiceway weirs as a standard procedure; operate the sluiceway 24 h/d year-round to maximize its benefits to juvenile salmonids; and use the same operations for spring and summer emigrants. These operational concepts are transferable to dams where sluiceway surface flow outlets are used protect downstream migrating fishes.

Johnson, Gary E.; Khan, Fenton; Skalski, J. R.; Klatte, Bernard A.

2013-11-20T23:59:59.000Z

320

Machine Shop Safe Operations Assessment Plan - Developed By NNSA/Nevada Site Office Facility Representative Division  

Broader source: Energy.gov (indexed) [DOE]

July 2003 - Machine Shop Safe Operations July 2003 - Machine Shop Safe Operations Utilize 29 CFR 1910 Utilize applicable LLNL, LANL, DTRA, BN procedures VALUE ADDED FOR: AMTS Contractor Assurance Focus Area AMTS ISM Improvements Focus Area AMTS Safety Precursors/Hazards Analysis Focus Area AMTS Environment, Safety, & Health Division MACHINE SHOP SAFE OPERATIONS Assessment Plan NNSA/Nevada Site Office Independent Oversight Division Performance Objective: The purpose of this assessment is to verify that machine shop operators are provided a safe and healthful workplace which will reduce or prevent injuries, illnesses, and accidental losses. Criteria: A worker protection program shall be implemented that provides a place of employment free from recognized hazards that are causing or likely to cause

Note: This page contains sample records for the topic "river operations office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Priority Based Reservoir Optimization using Linear Programming: Application to Flood Operation of the Iowa/Des Moines River System  

E-Print Network [OSTI]

for preservation of selected operating priorities and the effect that operating constraints have on systemPriority Based Reservoir Optimization using Linear Programming: Application to Flood Operation of the Iowa/Des Moines River System By MATTHEW JASON BROWN B.S. (The Pennsylvania State University) 1995

Lund, Jay R.

322

Savannah River Regional High School Science Bowl | U.S. DOE Office of  

Office of Science (SC) Website

Carolina Regions » Savannah River Carolina Regions » Savannah River Regional High School Science Bowl National Science Bowl® (NSB) NSB Home About High School High School Students High School Coaches High School Regionals High School Rules, Forms, and Resources Middle School Attending National Event Volunteers 2013 Competition Results News Media WDTS Home Contact Information National Science Bowl® U.S. Department of Energy SC-27/ Forrestal Building 1000 Independence Ave., SW Washington, DC 20585 P: 202-586-6702 E: National.Science.Bowl@science.doe.gov South Carolina Regions Savannah River Regional High School Science Bowl Print Text Size: A A A RSS Feeds FeedbackShare Page Regional Coordinator Information Name: Kim Mitchell Email: kimberly.mitchell@srs.gov Regional Event Information Date: Saturday, March 1, 2014

323

DOE/EA-1605: Environmental Assessment for Biomass Cogeneration and Heating Facilities at the Savannah River Site (August 2008)  

Broader source: Energy.gov (indexed) [DOE]

605 605 ENVIRONMENTAL ASSESSMENT FOR BIOMASS COGENERATION AND HEATING FACILITIES AT THE SAVANNAH RIVER SITE AUGUST 2008 U. S. DEPARTMENT OF ENERGY SAVANNAH RIVER OPERATIONS OFFICE SAVANNAH RIVER SITE DOE/EA-1605 ENVIRONMENTAL ASSESSMENT FOR BIOMASS COGENERATION AND HEATING FACILITIES AT THE SAVANNAH RIVER SITE AUGUST 2008 U.S. DEPARTMENT OF ENERGY SAVANNAH RIVER OPERATIONS OFFICE SAVANNAH RIVER SITE This page intentionally left blank - i - TABLE OF CONTENTS Page 1.0 INTRODUCTION ...................................................................................................1 1.1 Background and Proposed Action ...............................................................1 1.2 Purpose and Need ........................................................................................4

324

Federal Energy and Water Management Award Winner 22nd Operations Group Fuel Efficiency Office  

Broader source: Energy.gov (indexed) [DOE]

Efficiency Efficiency Office U.S. Air Force McConnell Air Force Base, Kansas During FY 2012, the 22nd Operations Group Fuel Efficiency Office (FEO) designed and implemented multiple measures, including a focus on institutional culture change, to reduce inefficiency in fuel management of the KC-135 aircraft and save the Air Force $4.3 million during a 42 percent rise in local sorties (the deployment of aircraft for missions of national defense or aircrew proficiency). These efforts included reducing KC-135 landing fuel by 5000 lb per sortie to save 1.94 million gallons per year; changing the KC-135 standard landing configuration to save 50 lb of fuel per approach; and implementing a new training configuration to reduce aircraft basic weight by 1,600 lb. The FEO also incorporated Mission Index Flying

325

Deputy Director for Field Operations Homepage | U.S. DOE Office of Science  

Office of Science (SC) Website

Home Home Deputy Director for Field Operations Deputy Director Home Mission & Functions Deputy Director Biography Organization Oversight Operations Improvement Committee Contact Information Deputy Director for Field Operations U.S. Department of Energy SC-3/Forrestal Building 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5434 F: (202) 586-4120 E: sc.science@science.doe.gov Print Text Size: A A A Subscribe FeedbackShare Page The DOE laboratory system is the most comprehensive research system of its kind in the world, and constitutes a critical strategic scientific and technical resource. The Office of Science has responsibility for 10 of the 17 DOE laboratories, helping to ensure they deliver exceptional scientific productivity benefiting the taxpayer. Each laboratory is

326

Office of Analysis and Evaluation of Operational Data 1989 annual report, Power reactors  

SciTech Connect (OSTI)

The annual report of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during 1989. The report is published in two separate parts. This document, NUREG-1272, Vol. 4, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about the trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports, diagnostic evaluations, and reports to the NRC's Operations Center. This report also compiles the status of staff actions resulting from previous Incident Investigation Team (IIT) reports. 16 figs., 9 tabs.

None

1990-07-01T23:59:59.000Z

327

Remedial investigation/feasibility study of the Clinch River/Poplar Creek operable unit. Volume 5  

SciTech Connect (OSTI)

This volume is in support of the findings of an investigation into contamination of the Clinch River and Poplar Creek near the Oak Ridge Reservation (for more than 50 years, various hazardous and radioactive substances have been released to the environment as a result of operations and waste management activities there). It addresses the quality assurance objectives for measuring the data, presents selected historical data, contains data from several discrete water characterization studies, provides data supporting the sediment characterization, and contains data related to several biota characterization studies.

NONE

1996-03-01T23:59:59.000Z

328

2011 Annual Workforce Analysis and Staffing Plan Report - Idaho Operations Office  

Broader source: Energy.gov (indexed) [DOE]

January 19~ 2012 Subject: Annual Workforce Analysis and Staffing Plan Report for Calendar Year 2011 (OS-DM-12-004) To: Karen L. Boardman, Chairperson Federal Technical Capability Panel National Nuclear Security Administration Reference: Memorandum, Karen Boardman to Distribution, "Annual Workforce Analysis and Staffing Plan Report for Calendar Year 2011," dated October 13,2011 In accordance with direction in the reference, the Department of Energy, Idaho Operations Office (DOE-ID) performed a workforce analysis and developed an Annual Workforce Analysis and Staffing Report. The Report is hereby submitted for the Federal Technical Capability Program (FTCP) review and incorporation into the FTCP Annual Report to the Secretary.

329

Ed Jascevsky Safety Division ChIcago Operations Office MIT CONTFACT INFCE"ATION  

Office of Legacy Management (LM)

;/:4,4 (; . 1.; ;/:4,4 (; . 1.; e octo: ' J : 18, 1976 Ed Jascevsky Safety Division ChIcago Operations Office MIT CONTFACT INFCE"ATION During the discussions on October 8, 1976, you iquired about information relative to work done by MIT as background infomation for survey planning. The enclosed information is parephrased frorc an unpublished history of program work carried out by the Process Eevclopncnt Group of the Dl.ti,si.on of Raw Katerids, I believe this work was done under contract nuder AT(30-1)956. Robert IE. Allen Process Facilities Safety Branch Division of Safety, Standards, and Compliance Fnclosure: As stated I I . ..--@q$?.. .... ............................................ ........ ..- .......................... . ... ... .- ................... .._ ................ .... ..__ ..............

330

TO : S. R. Sapirie, Manager C&c Ridge Operations Office FROM  

Office of Legacy Management (LM)

3@ceW 3@ceW emdtid#m . UNITED STATES GOVERNMENT TO : S. R. Sapirie, Manager C&c Ridge Operations Office FROM SULtJECTC TESTING OF SARPLR GF THORITE 'XRXX3lTRATE Symbol: RMtCWT ' .. DATE November 21r, 19% W&have received several inquirie s recently from mine owners and operators'in the western states, principally Colorado, who are potential producers of thorite concentrates. Upon the basis of preliminary data presently available there is a possibility that significant quantities of thorium may become available from this source at reasonable prices. In connection with our discussions with these potential suppliers it would be helpful to have information concerning the processing 4; ( which would be required to convert thorite concentrates jllto

331

C&ago Operations and Regional Office 9800 South Cass Avenue  

Office of Legacy Management (LM)

)53u Y )53u Y De artment of Energy . C&ago Operations and Regional Office 9800 South Cass Avenue Argonne, Illinois 60439 P P. R July 14, 1981 Billy D. ghfpp, Director Operational end Rwironmental Safety Division SDBJECT: CARPENTER ISCNNOLQGY GORPORATION, CARPENTER STIWL DIVISION, l&WING, P!6lQWTLVAMA A visit wea made to Carpenter Technology Corp., Carpenter Steel Division, Rnading, Pennsylvania, on June 7, 1981, by Paul Neeaon, DOE, end personnel of Argonne National Laboratory (ANL). ' Ihe AML perronnel included U. Smith, J. Thereon, D. Reilly, and C. Mayes. I0e group met with Mike Echalk, legal counsel, for Cerpsnter. ' Ihe purpose of the virit wee to perform a cursory rediological rurvey of certain area, at the above location, and to gather

332

Operations Authorization Assessment plan - Developed By NNSA/Nevada Site Office Facility Representative Division  

Broader source: Energy.gov (indexed) [DOE]

Operations Authorization Operations Authorization Assessment Plan NNSA/Nevada Site Office Independent Oversight Division Performance Objective: The objective of this assessment is to verify there is documentation in place which accurately describes the safety envelope for a facility, program or project. Criteria: Conditions and requirements should be established to ensure programs addressing all applicable functional areas are adequately implemented to support safe performance of the work. The extent of documentation and level of authority for agreement shall be tailored to the complexity and hazards associated with the work. Personnel shall be responsible and accountable for performance of work in accordance with the controls established. Controls established for safety are a discernible part of the plan for

333

Environmental Monitoring Plan United States Department of Energy Richland Operations Office. Revision 2  

SciTech Connect (OSTI)

This Environmental Monitoring Plan was prepared for the US Department of Energy`s (DOE`s) Richland Operations Office (RL) to implement the requirements of DOE Order 5400.1. According to the Order, each DOE site, facility, or activity that uses, generates, releases, or manages significant pollutants or hazardous materials shall prepare a written environmental monitoring plan covering two major activities: (1) effluent monitoring and (2) environmental surveillance. The plan is to contain information discussing the rationale and design criteria for the monitoring programs, sampling locations and schedules, quality assurance requirements, program implementation procedures, analytical procedures, and reporting requirements. The plan`s purpose is to assist DOE in the management of environmental activities at the Hanford Site and to help ensure that operations on the site are conducted in an environmentally safe and sound manner.

NONE

1997-11-10T23:59:59.000Z

334

This letter is in response to the Department of Energy Emergency Order to Resume Limited Operation at the Potomac River Genera  

Broader source: Energy.gov (indexed) [DOE]

7 7 th , 2007 Anthony J. Como Permitting, Siting, and Analysis Division Office of Electricity Delivery and Energy Reliability Department of Energy 1000 Independence Avenue, SW Washington, DC 20585-0119 Dear Mr.Como: This letter is in response to the Department of Energy Special Environmental Analysis for Actions Taken under the U.S Department of Energy Emergency Orders Regarding Operation of the Potomac River Generating Station in Alexandria, Virginia. Air Quality impacts This study neglects to report the spatial distribution of modeled pollutant concentrations The only information provided in this regard is that maximum modeled pollutant concentrations occur in Alexandria. Were there modeled NAAQS exceedances elsewhere, such as in the District of Columbia ?

335

Review of the Hanford Waste Treatment and Immobilization Project Black-Cell and Hard-to-Reach Pipe Spools Procurement Process and the Office of River Protection Audit of That Process  

Broader source: Energy.gov (indexed) [DOE]

Independent Oversight Review of the Independent Oversight Review of the Hanford Waste Treatment and Immobilization Plant Black-Cell and Hard-To-Reach Pipe Spools Procurement Process and the Office of River Protection Audit of That Process January 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U. S. Department of Energy Table of Contents 1.0 Purpose................................................................................................................................................... 1 2.0 Scope...................................................................................................................................................... 1 3.0 Background ............................................................................................................................................ 2

336

Review of the Hanford Waste Treatment and Immobilization Project Black-Cell and Hard-to-Reach Pipe Spools Procurement Process and the Office of River Protection Audit of That Process  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Independent Oversight Review of the Independent Oversight Review of the Hanford Waste Treatment and Immobilization Plant Black-Cell and Hard-To-Reach Pipe Spools Procurement Process and the Office of River Protection Audit of That Process January 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U. S. Department of Energy Table of Contents 1.0 Purpose................................................................................................................................................... 1 2.0 Scope...................................................................................................................................................... 1 3.0 Background ............................................................................................................................................ 2

337

Grande Ronde Endemic Spring Chinook Salmon Supplementation Project; Lostine River Operations and Maintenance 2007 Smolt Acclimation and Adult Return Report.  

SciTech Connect (OSTI)

The Nez Perce Tribe (NPT), through funding provided by the Bonneville Power Administration (BPA), has implemented a Chinook salmon supplementation program (250,000 smolts) on the Lostine River, a tributary to the Grande Ronde River of Oregon. The Grande Ronde Endemic Spring Chinook Salmon Supplementation project, which involves supplementation of the Upper Grande Ronde River and Catherine Creek in addition to the Lostine River, was established to prevent extirpation and increase the number of threatened Snake River spring/summer Chinook salmon (Oncorhynchus tshawytscha) returning to the Grande Ronde River. This report covers the eleventh season (1997-2007) of adult Chinook salmon broodstock collection in the Lostine River and the ninth season (1999-2007) of acclimation of resulting Lostine River progeny. Production of Lostine River spring Chinook salmon smolts currently occurs at Lookingglass Fish Hatchery (LGH). The Lostine River supplementation program utilizes two strategies to obtain egg source for production of smolts for supplementation: captive broodstock and conventional broodstock. The captive broodstock strategy involves (1) capture of natural juvenile spring Chinook salmon smolts from the Lostine River, (2) rearing those to adult and spawning them, and (3) rearing the resultant progeny for eventual acclimation and release back into the Lostine River. The conventional broodstock strategy involves (1) capture of natural and hatchery origin adults returning to the Lostine River, (2) holding those adults and spawning them, and (3) rearing the resultant progeny for acclimation and release back into the Lostine River. This report focuses on (1) the trapping and collection of adult spring Chinook salmon that return to the Lostine River, which provides the broodstock source for the conventional strategy and (2) the acclimation and release of juvenile spring Chinook salmon produced from the captive broodstock and conventional broodstock strategies In 2007, acclimation of Lostine River spring Chinook salmon smolts occurred from 3/5/07 through to 4/17/07 and a total of 230,010 smolts were acclimated and released. These smolts were produced from the brood year (BY) 2005 egg source and included captive brood (24,604) and conventional (205,406) origin smolts that were all progeny of Lostine River spring Chinook salmon. Operation of the Lostine River adult monitoring and collection facility in 2007 began May 14th. The first Chinook was captured on June 2, 2007 and the last Chinook was captured on September 25, 2007. The weir and trap were removed on October 1, 2007. A total of 637 adult Chinook, including jacks, were captured during the season. The composition of the run included 240 natural origin fish and 397 hatchery supplementation fish. There were no identified 'stray' hatchery fish from other programs trapped. Of the fish captured, 41 natural and 81 hatchery supplementation adults were retained for broodstock and transported to LGH for holding and spawning, 403 adult Chinook were passed or transported above the weir to spawn naturally, and only hatchery origin jack Chinook were transported and outplanted in the Wallowa River and Bear Creek in underseeded habitat. Of the 122 adult fish retained for broodstock, 20 natural females and 40 supplementation females were represented in spawning. The eggs from these females produced a total of 267,350 eggs at fertilization. Eye-up was 86.73% which yielded a total of 231,882 conventional program eyed eggs. The fecundity averaged 4,456 eggs per female. These eggs will be incubated and reared at Lookingglass Hatchery until they are smolts in the spring of 2009. Captive brood program eggs/fish will be added to the conventional program eggs to make up the entire juvenile release for the Lostine River program in 2009. Due to the success of the 2007 egg collection, the number of fish produced exceeded program needs and facility capabilities. As a result, there are plans to outplant fry in 2008 and parr in early 2009 to underseeded habitat in the Wallowa River.

Zollman, Richard L.; Eschler, Russell; Sealey, Shawn [Nez Perce Tribe

2009-03-31T23:59:59.000Z

338

Audit of Work Force Restructuring at the Oak Ridge Operations Office, ER-B-95-06  

Broader source: Energy.gov (indexed) [DOE]

OFFICE OF INSPECTOR GENERAL AUDIT OF WORK FORCE RESTRUCTURING AT THE OAK RIDGE OPERATIONS OFFICE The Office of Inspector General wants to make the distribution of its reports as customer friendly and cost effective as possible. Therefore, this report will be available electronically through the Internet five to seven days after publication at the following alternative addresses: Department of Energy Headquarters Gopher gopher.hr.doe.gov Department of Energy Headquarters Anonymous FTP vm1.hqadmin.doe.gov U.S. Department of Energy Human Resources and Administration Home Page

339

Independent Activity Report, Savannah River Site - June 2010 | Department  

Broader source: Energy.gov (indexed) [DOE]

June 2010 June 2010 Independent Activity Report, Savannah River Site - June 2010 June 2010 Savannah River Site Salt Waste Processing Facility Construction Site Orientation Visit The U.S. Department of Energy (DOE) Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), conducted an orientation visit on June 21-25, 2010, at the Salt Waste Processing Facility (SWPF) construction site at the DOE Savannah River Site (SRS). The purpose of the visit was to determine methods for HSS to carry out its independent oversight responsibilities with respect to this project in coordination with DOE's Savannah River Operations Office (DOE-SR). Independent Activity Report, Savannah River Site - June 2010 More Documents & Publications Independent Activity Report, Savannah River Site - May 2010

340

Independent Activity Report, Savannah River Site - May 2010 | Department of  

Broader source: Energy.gov (indexed) [DOE]

May 2010 May 2010 Independent Activity Report, Savannah River Site - May 2010 May 2010 Savannah River Site Salt Waste Processing Facility Construction Site Walkthrough The U.S. Department of Energy (DOE), Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), conducted a visit to the Savannah River Site (SRS) on May 4-5, 2010. The visit focused on the Salt Waste Processing Facility (SWPF) Construction Site, which is managed by Parsons with DOE line management program direction and oversight from the DOE Savannah River Operations Office. Independent Activity Report, Savannah River Site - May 2010 More Documents & Publications Independent Activity Report, Savannah River Site - June 2010 Consent Order, Parsons Infrastructure & Technology Group, Inc. -

Note: This page contains sample records for the topic "river operations office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

2011 Annual Workforce Analysis and Staffing Plan Report- Savannah River Site Office  

Broader source: Energy.gov [DOE]

Managers perform an annual workforce analysis of their organization and develop staffing plans that identify technical capabilities and positions they need to ensure safe operation of defense nuclear facilities.

342

2014 Annual Workforce Analysis and Staffing Plan Report- Savannah River Field Office  

Broader source: Energy.gov [DOE]

Managers perform an annual workforce analysis of their organization and develop staffing plans that identify technical capabilities and positions they need to ensure safe operation of defense nuclear facilities.

343

2013 Annual Workforce Analysis and Staffing Plan Report- Office of River Protection  

Broader source: Energy.gov [DOE]

Managers perform an annual workforce analysis of their organization and develop staffing plans that identify technical capabilities and positions they need to ensure safe operation of defense nuclear facilities.

344

2012 Annual Workforce Analysis and Staffing Plan Report- Savannah River Site Office  

Broader source: Energy.gov [DOE]

Managers perform an annual workforce analysis of their organization and develop staffing plans that identify technical capabilities and positions they need to ensure safe operation of defense nuclear facilities.

345

2011 Annual Workforce Analysis and Staffing Plan Report- Office of River Protection  

Broader source: Energy.gov [DOE]

Managers perform an annual workforce analysis of their organization and develop staffing plans that identify technical capabilities and positions they need to ensure safe operation of defense nuclear facilities.

346

2013 Annual Workforce Analysis and Staffing Plan Report- Savannah River Field Office  

Broader source: Energy.gov [DOE]

Managers perform an annual workforce analysis of their organization and develop staffing plans that identify technical capabilities and positions they need to ensure safe operation of defense nuclear facilities.

347

2012 Annual Workforce Analysis and Staffing Plan Report- Office of River Protection  

Broader source: Energy.gov [DOE]

Managers perform an annual workforce analysis of their organization and develop staffing plans that identify technical capabilities and positions they need to ensure safe operation of defense nuclear facilities.

348

2010 Annual Workforce Analysis and Staffing Plan Report- Office of River Protection  

Broader source: Energy.gov [DOE]

Managers perform an annual workforce analysis of their organization and develop staffing plans that identify technical capabilities and positions they need to ensure safe operation of defense nuclear facilities.

349

Grande Ronde Endemic Spring Chinook Salmon Supplementation Project; Lostine River Operations and Maintenance 2004 Smolt Acclimation and Adult Return Report.  

SciTech Connect (OSTI)

The Nez Perce Tribe (NPT), through funding provided by the Bonneville Power Administration (BPA), has implemented a Chinook salmon supplementation program (250,000 smolts) on the Lostine River, a tributary to the Grande Ronde River of Oregon. The Grande Ronde Endemic Spring Chinook Salmon Supplementation project, which involves supplementation of the Upper Grande Ronde River and Catherine Creek in addition to the Lostine River, was established to prevent extirpation and increase the number of threatened Snake River spring/summer Chinook salmon (Oncorhynchus tshawytscha) returning to the Grande Ronde River. This report covers the eighth season (1997-2004) of adult Chinook salmon broodstock collection in the Lostine River and the sixth season (1999-2004) of acclimation of resulting Lostine River progeny. Production of Lostine River spring Chinook salmon smolts currently occurs at Lookingglass Fish Hatchery (LGH). The Lostine River supplementation program utilizes two strategies to obtain egg source for production of smolts for supplementation: captive broodstock and conventional broodstock. The captive broodstock strategy involves (1) capture of natural juvenile spring Chinook salmon smolts from the Lostine River, (2) rearing those to adult and spawning them, and (3) rearing the resultant progeny for eventual acclimation and release back into the Lostine River. The conventional broodstock strategy involves (1) capture of natural and hatchery origin adults returning to the Lostine River, (2) holding those adults and spawning them, and (3) rearing the resultant progency for acclimation and release back into the Lostine River. This report focuses on (1) the trapping and collection of adult spring Chinook salmon that return to the Lostine River, which provides the broodstock source for the conventional strategy and (2) the acclimation and release of juvenile spring Chinook salmon produced from the captive broodstock and conventional broodstock strategies. In 2004, acclimation of Lostine River spring Chinook salmon smolts occurred from March 1, 2004 through to April 14, 2004 and a total of 250,249 smolts were acclimated and released. These smolts were produced from the brood year (BY) 2002 egg source and included captive brood (133,781) and conventional (116,468) origin smolts that were all progeny of Lostine River spring Chinook salmon. Operation of the Lostine River adult monitoring and collection facility in 2004 began May 10, the first Chinook was captured on May 19, 2004 and the last Chinook was captured on September 16, 2004. The weir and trap were removed on October 1, 2004. A total of 1,091 adult Chinook, including jacks, were captured during the season. The composition of the run included 299 natural origin fish and 792 hatchery supplementation fish. There were no identified 'stray' hatchery fish from other programs trapped. Of the fish captured, 46 natural and 69 hatchery supplementation adults were retained for broodstock and transported to Lookingglass Hatchery for holding and spawning, 537 adult Chinook were passed or transported above the weir to spawn naturally, and 447 hatchery origin adult Chinook were transported and outplanted in the Wallowa River and Bear Creek to spawn in underseeded habitat. Of the 107 adults retained (eight additional hatchery females were collected and then later returned to the Lostine River to spawn naturally) for broodstock at Lookingglass Hatchery, 22 natural females and 30 supplementation females were represented in spawning. These females produced a total of 221,889 eggs at fertilization. Eye-up was 94.9% which yielded a total of 210,661 conventional program eyed eggs. The fecundity averaged 4,267 eggs per female. These eggs were incubated and at Lookingglass Hatchery until eyed stage and then transferred to Oxbow Hatchery where they will be reared to the fingerling stage. They will then be transported back to LGH and reared to the smolt stage and then transported to the Lostine acclimation facility for release in the spring of 2006. Captive brood program eggs/fish will be added to

Zollman, Richard L.; Eschler, Russell; Sealey, Shawn [Nez Perce Tribe

2009-03-31T23:59:59.000Z

350

Grande Ronde Endemic Spring Chinook Salmon Supplementation Project; Lostine River Operations and Maintenance 2006 Smolt Acclimation and Adult Return Report.  

SciTech Connect (OSTI)

The Nez Perce Tribe (NPT), through funding provided by the Bonneville Power Administration (BPA), has implemented a Chinook salmon supplementation program (250,000 smolts) on the Lostine River, a tributary to the Grande Ronde River of Oregon. The Grande Ronde Endemic Spring Chinook Salmon Supplementation project, which involves supplementation of the Upper Grande Ronde River and Catherine Creek in addition to the Lostine River, was established to prevent extirpation and increase the number of threatened Snake River spring/summer Chinook salmon (Oncorhynchus tshawytscha) returning to the Grande Ronde River. This report covers the tenth season (1997-2006) of adult Chinook salmon broodstock collection in the Lostine River and the eighth season (1999-2006) of acclimation of resulting Lostine River progeny. Production of Lostine River spring Chinook salmon smolts currently occurs at Lookingglass Fish Hatchery (LGH). The Lostine River supplementation program utilizes two strategies to obtain egg source for production of smolts for supplementation: captive broodstock and conventional broodstock. The captive broodstock strategy involves (1) capture of natural juvenile spring Chinook salmon smolts from the Lostine River, (2) rearing those to adult and spawning them, and (3) rearing the resultant progeny for eventual acclimation and release back into the Lostine River. The conventional broodstock strategy involves (1) capture of natural and hatchery origin adults returning to the Lostine River, (2) holding those adults and spawning them, and (3) rearing the resultant progeny for acclimation and release back into the Lostine River. This report focuses on (1) the trapping and collection of adult spring Chinook salmon that return to the Lostine River, which provides the broodstock source for the conventional strategy and (2) the acclimation and release of juvenile spring Chinook salmon produced from the captive broodstock and conventional broodstock strategies In 2006, acclimation of Lostine River spring Chinook salmon smolts occurred from February 27, 2006 through to April 10, 2006 and a total of 240,568 smolts were acclimated and released. These smolts were produced from the brood year (BY) 2004 egg source and included captive brood (40,982) and conventional (199,586) origin smolts that were all progeny of Lostine River spring Chinook salmon. Operation of the Lostine River adult monitoring and collection facility in 2006 began May 15th, the first Chinook was captured on June 14, 2006 and the last Chinook was captured on September 27, 2006. The weir and trap were removed on October 1, 2006. A total of 534 adult Chinook, including jacks, were captured during the season. The composition of the run included 205 natural origin fish and 329 hatchery supplementation fish. There were no identified 'stray' hatchery fish from other programs trapped. Of the fish captured, 33 natural and 120 hatchery supplementation adults were retained for broodstock and transported to LGH for holding and spawning and 397 adult Chinook were passed or transported above the weir to spawn naturally. In 2006, no hatchery origin adult Chinook were transported and out planted in the Wallowa River and Bear Creek to spawn in under seeded habitat. In order to meet egg take goals for the conventional portion of the program, a determination was made that approximately 147 adults were needed for broodstock. As a result 16 (8 males and 8 females) of the 153 fish collected for broodstock were returned to the Lostine River to spawn naturally. Females that were spawned and provided the brood source were made up of 12 natural females and 45 supplementation females. One of these females tested positive for high levels of Bacterial Kidney Disease and consequently this females eggs were destroyed. The remaining females produced a total of 241,372 eggs at fertilization. Eye-up was 85.47% which yielded a total of 206,309 conventional program eyed eggs. The fecundity averaged 4,162 eggs per female. The brood year 2006 eggs will be incubated and reared at Lookingglass Hatchery until

Zollman, Richard L.; Eschler, Russell; Sealey, Shawn [Nez Perce Tribe

2009-03-31T23:59:59.000Z

351

Warehouses in New York, New York To: J. LaGrone Manager Oak Ridge Operations Office  

Office of Legacy Management (LM)

,' ,' .sd "IcI.V.2 U".W.. . ..* . . .._ inemo+indUm DATE: ADO 031sso .~.. - -.-. - ._ xiveI,,-r &8/ ",P& -gm?j4P hw 4 1 REPLY t-0 ATTNOF: EM-40 (A. Williams, 3-5439) /"Y . SUBJECT: Authorization for Remedial Action at the Former Baker and Williams Warehouses in New York, New York To: J. LaGrone Manager Oak Ridge Operations Office The site of the former Baker and Williams Warehouses in New York City is hereby authorized for remedial action under the Formerly Utilized Sites Remedial Action Project (FUSRAP). The designation survey performed by ORAU found contamination in one of the three warehouses in excess of DOE guidelines on floors and lower walls in the east bay of the basement and on the floor of the west bay of the first floor.

352

2012 Annual Workforce Analysis and Staffing Plan Report - Idaho Operations Office  

Broader source: Energy.gov (indexed) [DOE]

4, 2013 4, 2013 Subject: Annual Workforce Analysis and Staffing Plan Report for Calendar Year 2012 (EM-NSPD-13-003) To: Karen L. Boardman, Chairman Federal Technical Capability Panel National Nuclear Security Administration Reference: Memorandum, Karen Boardman to Distribution, "Annual Workforce Analysis and Staffing Plan Report for Calendar Year 2012," dated October 24, 2012 In accordance with direction in the reference, the Department of Energy, Idaho Operations Office (DOE-ID) performed a workforce analysis and developed an Annual Workforce Analysis and Staffing Report. The Report is herby submitted for the Federal Technical Capability Program (FTCP) review and incorporation into the FTCP Annual Report to the Secretary. Questions may be addressed to the DOE-ID FTCP Agent, Mark C. Brown at (208) 526-

353

Ch P cage Operations and Regional Office 9800 South Cass Avenue  

Office of Legacy Management (LM)

artment of Energy artment of Energy Ch P cage Operations and Regional Office 9800 South Cass Avenue Argonne, Illinois 60439 OCT 2 1 1980 Ki.lliam E. Mott, Director Environmental Cinttol Technology Division, KC! SUBJECT I PREHIER MANUFACTURING - SPRINGDALE, PEhVSYLVA?UA A visit to Premier Manufacturing, 644 Garfield, Springdalc, Pennsylvania, was made en October 6, 1980, by Edward J. Jascewsky and Art Whitman, Department of Energy, and Walter R. Smith, Argonne National Laboratory. The group met with Edward McClesky, Premier Manufacturing and Bud Schnoor, PPG Industries, Inc. The purpose of the visit was to perform a cursory radiological survey of the facility at the above location. In addition, discussions were held with Mr. Schnoor whose family previously owned the facility and performed the

354

Office for Analysis and Evaluation of Operational Data 1996 annual report. Volume 10, Number 1: Reactors  

SciTech Connect (OSTI)

This annual report of the US Nuclear Regulatory Commission`s Office for Analysis and Evaluation of Operational Data (AEOD) describes activities conducted during 1996. The report is published in three parts. NUREG-1272, Vol. 10, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports and reports to the NRC`s Operations Center. NUREG-1272, Vol. 10, No. 2, covers nuclear materials and presents a review of the events and concerns during 1996 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. Both reports also contain a discussion of the Incident Investigation Team program and summarize both the Incident Investigation Team and Augmented Inspection Team reports. Each volume contains a list of the AEOD reports issued from CY 1980 through 1996. NUREG-1272, Vol. 10, No. 3, covers technical training and presents the activities of the Technical Training Center in support of the NRC`s mission in 1996.

NONE

1997-12-01T23:59:59.000Z

355

Office for Analysis and Evaluation of Operational Data 1990 annual report  

SciTech Connect (OSTI)

The annual report of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during 1990. The report is published in two separate parts. This document NUREG-1272, Vol. 5, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about the trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports, diagnostic evaluations, and reports to the NRC's Operations Center. NUREG-1272, Vol.5, No. 2, covers nonreactors and presents a review of the events and concerns during 1990 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. The reports contain a discussion of the Incident Investigation Team program and summarize the Incident Investigation Team and Augmented Inspection Team reports for that group of licensees. Each volume contains a list of the AEOD reports issued for 1980 through 1990. 9 figs., 8 tabs.

None

1991-07-01T23:59:59.000Z

356

Grande Ronde Endemic Spring Chinook Salmon Supplementation Project; Lostine River Operations and Maintenance 2003 Smolt Acclimation and Adult Return Report.  

SciTech Connect (OSTI)

The Nez Perce Tribe (NPT), through funding provided by the Bonneville Power Administration (BPA), has implemented a Chinook salmon supplementation program (250,000 smolts) on the Lostine River, a tributary to the Grande Ronde River of Oregon. The Grande Ronde Endemic Spring Chinook Salmon Supplementation project, which involves supplementation of the Upper Grande Ronde River and Catherine Creek in addition to the Lostine River, was established to prevent extirpation and increase the number of threatened Snake River spring/summer Chinook salmon (Oncorhynchus tshawytscha) returning to the Grande Ronde River. This report covers the seventh season (1997-2003) of adult Chinook salmon broodstock collection in the Lostine River and the fifth season (1999-2003) of acclimating the resultant progeny. Production of Lostine River spring Chinook salmon smolts currently occurs at Lookingglass Fish Hatchery (LGH). The Lostine River supplementation program utilizes two strategies to obtain egg source for production of smolts for supplementation: captive broodstock and conventional broodstock. The captive broodstock strategy involves (1) capture of natural juvenile spring Chinook salmon smolts from the Lostine River, (2) rearing those to adult and spawning them, and (3) rearing the resultant progeny for eventual acclimation and release back into the Lostine River. The conventional broodstock strategy involves (1) capture of natural and hatchery origin adults returning to the Lostine River, (2) holding those adults and spawning them, and (3) rearing the resultant progeny for acclimation and release back into the Lostine River. This report focuses on (1) the trapping and collection of adult spring Chinook salmon that return to the Lostine River, which provides the broodstock source for the conventional strategy and (2) the acclimation and release of juvenile spring Chinook salmon produced from the captive broodstock and conventional broodstock strategies. In 2003, acclimation of Lostine River spring Chinook salmon smolts occurred from March 3, 2003 through to April 14, 2003 and a total of 242,776 smolts were acclimated and released. These smolts were produced from the brood year (BY) 2001 egg source and included captive broodstock (141,860) and conventional broodstock (100,916) origin smolts that were all progeny of Lostine River spring Chinook salmon. Operation of the Lostine River adult monitoring and collection facility in 2003 began April 30th, the first Chinook was captured on May 16, 2003 and the last Chinook was captured on September 21, 2003. The weir and trap were removed on October 1, 2003. A total of 464 adult Chinook, including jacks, were captured during the season. The composition of the run included 239 natural origin fish and 225 hatchery supplementation fish. There were no identified 'stray' hatchery fish from other programs trapped. Of the fish captured, 45 natural and 4 hatchery supplementation adults were retained for broodstock and transported to LGH for holding and spawning, 366 adult Chinook were passed or transported above the weir to spawn naturally, and 49 hatchery origin adult jack Chinook were transported and outplanted in the Wallowa River and Bear Creek to spawn in underseeded habitat. Of the 49 adults retained for broodstock at Lookingglass Hatchery, 21 natural females and no hatchery origin females were represented in spawning. These females produced a total of 106,609 eggs at fertilization. Eye-up was 95.50% which yielded a total of 101,811 conventional program eyed eggs. The fecundity averaged 5,077 eggs per female. These eggs were incubated and at Lookingglass Hatchery until eyed stage. At eye they were transferred to Oxbow Hatchery where they were reared to the fingerling state at which time they were transported back to LGH until they were smolts in the spring of 2005. Captive brood program eggs/fish will be added to the conventional program eggs to make up the entire juvenile release for the Lostine River program in 2005.

Zollman, Richard L.; Eschler, Russell; Sealey, Shawn [Nez Perce Tribe

2009-03-31T23:59:59.000Z

357

Record of Decision: Savannah River Site Waste Management, Savannah Rive Operations Office, Aiken, SC  

Broader source: Energy.gov (indexed) [DOE]

249 249 Federal Register / Vol. 60, No. 209 / Monday, October 30, 1995 / Notices of application notices for discretionary grant competitions, can be viewed on the Department's electronic bulletin board (ED Board), telephone (202) 260- 9950; or on the Internet Gopher Server at GPOHER.ED.GOV (under Announcements, Bulletins, and Press Releases). However, the official application notice for a discretionary grant competition is the notice published in the Federal Register. Program Authority: 20 U.S.C. 1135-1135a- 3. Dated: October 23, 1995. David A. Longanecker, Assistant Secretary for Postsecondary Education. [FR Doc. 95-26751 Filed 10-27-95; 8:45 am] BILLING CODE 4000-01-M DEPARTMENT OF ENERGY Availability of Implementation Plan for the Medical Isotopes Production Project: Molybdenum-99 and Related

358

U. S. Department of Energy Savannah River Operations Office - F and H Tank  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

F and H Tank Farm Closure Documents F and H Tank Farm Closure Documents F and H Tank Farm Closure Documents F Tank Farm Closure Documents F Tank Farm Performance Assessment F Tank Farm Performance Assessment -- Revision 1 Tank 18/Tank 19 Special Analysis Industrial Wastewater General Closure Plan for F-Area Waste Tank System -- Final Industrial Wastewater Closure Module for the Liquid Waste Tanks 18 and 19 DOE agreement to cease waste removal SC approval to Closure Module and agreement to cease waste removal EPA agreement to cease waste removal Tanks 17 and 20 Closure Errata Industrial Wastewater Closure Module for the High-Level Waste Tank 17 System Industrial Wastewater Closure Module for the High-Level Waste Tank 20 System Draft Basis for Section 3116 Determination for Closure of F Tank Farm at SRS

359

Technical Qualification Program Self-Assessment Report- Savannah River Operations Office- 2010  

Broader source: Energy.gov [DOE]

A set of disciplined Criteria, Review, and Approach Documents (CRADs) were developed by the Team Leader utilizing criteria and objectives provided on the FTCP website. Specific "lines of inquiry" were tailored to the organization and assessment processes of the DOE-SR.

360

EIS-0147: Continued Operation of the K-,L-, and P- Reactors, Savannah River Site, Aiken, South Carolina  

Broader source: Energy.gov [DOE]

This environmental impact statement (EIS) analyzes the environmental impacts of the proposed action, which is to continue operation of K-, L-, and P-Reactors at the Savannah River Site (SRS) to ensure the capability to produce nuclear materials, and to produce nuclear materials as necessary for United States defense and nondefense programs.

Note: This page contains sample records for the topic "river operations office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Operational Awareness Oversight of the Portsmouth/Paducah Project Office Performance of the Contractor Assurance System Program, April 2013  

Broader source: Energy.gov (indexed) [DOE]

HIAR PORTS-2012-09-24 HIAR PORTS-2012-09-24 Site: Portsmouth Gaseous Diffusion Plant Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for Operational Awareness Oversight of the Portsmouth/Paducah Project Office (PPPO) Performance of the Contractor Assurance System (CAS) Program Dates of Activity : 09/24/12 - 10/04/12 Report Preparer: Joseph P. Drago Activity Description/Purpose: The Office of Health, Safety and Security (HSS) shadowed PPPO's review of specific elements of the Fluor-B&W Portsmouth (FBP) CAS program at the Portsmouth Gaseous Diffusion Plant (PORTS). The review was limited to three requirements of Department of Energy (DOE) Order 226.1B, Implementation of Department of Energy Oversight Policy:

362

DOE Nevada Operations Office Environmental Protection Implementation Plan, November 9, 1993--November 9, 1994  

SciTech Connect (OSTI)

DOE Order 5400.1, ``General Environmental Protection Program,`` established environmental protection program requirements, authorities, and responsibilities to assure that the Department of Energy (DOE) operations are in compliance with applicable federal, state, and local environmental protection laws and regulations, executive orders, and internal department policies. Chapter III of DOE Order 5400.1 required that each field organization prepare a plan for implementing the requirements of this order by no later than November 9, 1989, and update the plan annually. Therefore, the Department of Energy/Nevada Operations Office (DOE/NV) has prepared this fourth annual update of its Environmental Protection Implementation Plan (EPIP). The Order and corresponding guidances also require estimated budgetary resources necessary for implementation of the Order be identified in the Environmental Protection Implementation Plan. To satisfy this requirement, the estimated costs to effectuate necessary changes in existing programs or processes and to institute new programs or processes for compliance with the Order are provided in the following sections of this plan. The DOE/NV Assistant Manager for Environment, Safety, Security, & Health (AMESSH), in consultation with other organizations responsible for line management of plan implementation, is responsible for annual plan revisions.

Elle, D.R. [USDOE Nevada Operations Office, Las Vegas, NV (United States); Townsend, Y.E. [ed.; Latham, A.R.; Black, S.C. [Reynolds Electrical and Engineering Co., Inc., Las Vegas, NV (United States)

1993-11-01T23:59:59.000Z

363

Workers Demolish Reactor Support Facility as Part of River Corridor Contract  

Broader source: Energy.gov [DOE]

RICHLAND, Wash. EMs Richland Operations Office and cleanup contractor Washington Closure Hanford recently completed the cleanout and demolition of the last reactor support facility as part of the River Corridor Closure Contract.

364

Redesignation Order No. 00-09.01-01 to the Manager of Department of Energy Idaho Operations Office  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Redesignation of the Manager of the Idaho Operations Office as the representative to perform as the "authorized representative," as that term is used in the NRC regulations at 10 CFR 72.16(b), and as name holder of the NRC license under 10 CFR 72 for the Idaho Spent Fuel Facility Independent Spent Fuel Storage Installation.

2006-05-12T23:59:59.000Z

365

Office of River Protection (DOE-ORP) Hanford Tank Waste Treatment Alternatives March 2000  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) is currently planning to retrieve, pretreat, immobilize and safely dispose of 53 million gallons of highly radioactive waste currently stored in underground tanks at Hanford Site. The DOE plan is a two-phased approach to privatizing the processing of hazardous and radioactive waste. Phase 1 is a proof-of-concept/commercial demonstration-scale effort whose objectives are to: demonstrate, the technical and business viability of using privatized facilities to treat Hanford tank waste; define and maintain required levels of radiological, nuclear, process and occupational safety; maintain environmental protection and compliance; and substantially reduce life-cycle costs and time required to treat Hanford tank waste. The Phase 1 effort consists of Part A and Part B. On September 25, 1996 (Reference 1), DOE signed a contract with BNFL, Inc. (BNFL) to commence with Phase 1, Part A. In August 1998, BNFL was authorized to proceed with Phase I, Part 6-1, a 24-month design phase that will-provide sufficient engineering and financial maturity to establish fixed-unit prices and financing terms for tank waste processing services in privately-owned and -operated facilities. By August 2000, DOE will decide whether to authorize BNFL to proceed with construction and operation of the proposed processing facilities, or pursue a different path. To support of the decision, DOE is evaluating alternatives to potentially enhance the BNFL tank waste processing contract, as well as, developing an alternate path forward should DOE decide to not continue the BNFL contract. The decision on whether to continue with the current privatization strategy (BNFL contract) or to pursue an alternate can not be made until the evaluation process leading up to the decision on whether to authorize BNFL to proceed with construction and operation (known as the Part 8-2 decision) is completed. The evaluation process includes reviewing and evaluating the information BNFL is scheduled to submit in April 2000, and negotiating the best mutually acceptable contract terms. The alternatives studies completed to-date are summarized in Reference 2.

WODRICH, D.D.

2000-03-24T23:59:59.000Z

366

Oversight Reports - Savannah River Site | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

December 9, 2009 Independent Oversight Inspection, Savannah River Site Office - December 2009 Inspection of Nuclear Safety at the Savannah River Site Office and the Tritium Program...

367

Assessment of the Portsmouth/Paducah Project Office Conduct of Operations Oversight of the Depleted Uranium Hexafluoride Conversion Plants, May 2012  

Broader source: Energy.gov (indexed) [DOE]

Assessment of the Assessment of the Portsmouth/Paducah Project Office Conduct of Operations Oversight of the Depleted Uranium Hexafluoride Conversion Plants May 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................... 1 2.0 Background ............................................................................................................................................ 1 3.0 Scope ...................................................................................................................................................... 2

368

Assessment of the Portsmouth/Paducah Project Office Conduct of Operations Oversight of the Depleted Uranium Hexafluoride Conversion Plants, May 2012  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Assessment of the Assessment of the Portsmouth/Paducah Project Office Conduct of Operations Oversight of the Depleted Uranium Hexafluoride Conversion Plants May 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................... 1 2.0 Background ............................................................................................................................................ 1 3.0 Scope ...................................................................................................................................................... 2

369

Categorical Exclusion Determinations: Office of Energy Efficiency and  

Broader source: Energy.gov (indexed) [DOE]

27, 2011 27, 2011 CX-006929: Categorical Exclusion Determination Florida-City-Gainesville CX(s) Applied: A9, B1.32, B2.5, B5.1 Date: 09/27/2011 Location(s): Gainesville, Florida Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory September 27, 2011 CX-007075: Categorical Exclusion Determination Wisconsin-City-Green Bay CX(s) Applied: A1, A9, A11, B1.32, B2.5, B5.1 Date: 09/27/2011 Location(s): Green Bay, Wisconsin Office(s): Energy Efficiency and Renewable Energy, Savannah River Operations Office September 27, 2011 CX-006971: Categorical Exclusion Determination Clean Energy Coalition - Michigan Green Fleets CX(s) Applied: A7, B5.1 Date: 09/27/2011 Location(s): Detroit, Michigan Office(s): Energy Efficiency and Renewable Energy, Savannah River

370

Columbia River System Operation Review : Final Environmental Impact Statement, Appendix T (Second Continued Volume): Comments & Responses.  

SciTech Connect (OSTI)

This is Appendix T (second continued volume) giving public comments and responses to the final environmental impact statement for the Columbia River System.

Columbia River System Operation Review (U.S.)

1995-11-01T23:59:59.000Z

371

NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC.  

E-Print Network [OSTI]

& Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. Contract No. DE-AC36-08GO28308.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance

372

Office for Analysis and Evaluation of Operational Data. Annual report, 1994-FY 95  

SciTech Connect (OSTI)

The United States Nuclear Regulatory Commission`s Office for Analysis and Evaluation of Operational Data (AEOD) has published reports of its activities since 1984. The first report covered January through June of 1984, and the second report covered July through December 1984. Since those first two semiannual reports, AEOD has published annual reports of its activities from 1985 through 1993. Beginning with the report for 1986, AEOD Annual Reports have been published as NUREG-1272. Beginning with the report for 1987, NUREG-1272 has been published in two parts, No. 1 covering power reactors and No. 2 covering nonreactors (changed to {open_quotes}nuclear materials{close_quotes} with the 1993 report). The 1993 AEOD Annual Report was NUREG-1272, Volume 8. AEOD has changed its annual report from a calendar year to a fiscal year report to be consistent with the NRC Annual Report and to conserve staff resources. NUREG-1272, Volume 9, No. 1 and No. 2, therefore, are combined calendar year 1994 (1994) and fiscal year 1995 (FY 95) reports which describe activities conducted between January 1, 1994, and September 30, 1995. Certain data which have historically been reported on a calendar year basis, however, are complete through calendar year 1995. Throughout this report, whenever information is presented for fiscal year 1995, it is designated as FY 95 data. Calendar year information is always designated by the four digits of the calendar year. This report, NUREG-1272, Volume 9, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective. NUREG-1272, Vol. 9, No. 2, covers nuclear materials and presents a review of the events and concerns associated with the use of licensed material in non-power reactor applications. A new part has been added, NUREG-1272, Volume 9, No. 3, which covers technical training and presents the activities of the Technical Training Center in FY 95 in support of the NRC`s mission.

none,

1996-07-01T23:59:59.000Z

373

Vehicle Technologies Office Merit Review 2014: High Compression Ratio Turbo Gasoline Engine Operation Using Alcohol Enhancement  

Broader source: Energy.gov [DOE]

Presentation given by Massachusetts Institute of Technology at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about high...

374

Report on Inspection of an Intelligence Work-For-Others Project at the Idaho Operations Office, IG-0367  

Broader source: Energy.gov (indexed) [DOE]

REPORT ON INSPECTION OF AN INTELLIGENCE WORK-FOR-OTHERS PROJECT AT THE IDAHO OPERATIONS OFFICE The Office of Inspections wants to make the distribution of its inspection reports as customer friendly and cost effective as possible. Therefore, we are making this report available electronically through the Internet at the following alternative addresses: Department of Energy Headquarters Gopher gopher.hr.doe.gov Department of Energy Headquarters Anonymous FTP vml.hqadmin.doe.gov We are experimenting with various options to facilitate audit report distribution. Your comments would be appreciated and can be provided on the Customer Comment Form attached to the

375

Environmental Assessment for the Construction, Operation, and Closure of the Burma Road II Borrow Pit at the Savannah River Site  

Broader source: Energy.gov (indexed) [DOE]

Construction, Operation, and Closure of the Construction, Operation, and Closure of the Burma Road II Borrow Pit at the Savannah River Site Agency: U.S. Department of Energy Action: Finding of No Significant Impact Summary: The U.S. Department of Energy (DOE) has prepared an environmental assessment (EA) (DOE/EA-1501) to analyze the potential environmental impacts of a new borrow pit, and its alternatives, at the Savannah River Site (SRS), located near Aiken, South Carolina. Based on the analyses in the EA, DOE has determined that this action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA). Therefore, the preparation of an environmental impact statement (EIS) is not

376

Enforcement Letter, Westinghouse Savannah River Company - April 15, 1997 |  

Broader source: Energy.gov (indexed) [DOE]

Savannah River Company - April 15, Savannah River Company - April 15, 1997 Enforcement Letter, Westinghouse Savannah River Company - April 15, 1997 April 15, 1997 Issued to Westinghouse Savannah River Company related to Potential Violations of Quality Assurance and Work Process Requirements at the Savannah River Site On February 11, 1997, the Office of Enforcement and Investigation (EH-10) met with members of your staff and the DOE Savannah River Operations Office (DOE-SR) to review your progress in correcting the noncompliances identified in the subject Noncompliance Tracking System (NTS) reports. A summary of our meeting and assessment of the information provided is enclosed with this letter. Your evaluation of the events and conditions leading to each of the occurrences, reported to EH-10 in the subject NTS reports, has identified

377

OFFICE OF RIVER PROTECTION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

declaration and management of Potential Inadequacies in the Safety Basis (PISA's); c) Upgrading of the 242-A Evaporator DSA to comply with DOE-STD-3009 CN3 d) Unreviewed Safety...

378

Mitigation measures for fish habitat improvement in Alpine rivers affected by hydropower operations  

E-Print Network [OSTI]

to their ecological effectiveness. Compensation basins and powerhouse outflow deviation achieved the best cost of the turbines produce highly unsteady flow in the river downstream of the powerhouse (Moog, 1993). This so

379

Enhanced Operation Strategies for Air-Conditioning and Lighting Systems Toward Peak Power Reduction for an Office Building in Kuwait  

E-Print Network [OSTI]

Enhanced?Operation?Strategies?for?Air? Conditioning?and?Lighting? Systems?Toward?Peak?Power?Reduction? for?an?Office?Building?in?Kuwait F. Alghimlas A. Al-Mulla G.P. Maheshwari D. Al-Nakib Building and Energy Technologies Department... Environment and Urban Development Division ICEBO 2012 Manchester, United Kingdom October 23-26, 2012 Electricity?Use?by?Sector?in?Kuwait Percentages?of?Primary?Energy?Utilization Percentages?of?Electricity?Utilization Yearly?Increase?in...

Alghimlas, F.; Al-Mulla, A.; Maheshwari, G.P.; Al-Nakib, D.

2012-01-01T23:59:59.000Z

380

Use of Noncompetitive Procurements to Obtain Services at the Savannah River Site, IG-0862  

Broader source: Energy.gov (indexed) [DOE]

Use of Noncompetitive Use of Noncompetitive Procurements to Obtain Services at the Savannah River Site DOE/IG-0862 April 2012 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 April 10, 2012 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Audit Report on "Use of Noncompetitive Procurements to Obtain Services at the Savannah River Site" INTRODUCTION AND OBJECTIVE Savannah River Nuclear Solutions, LLC (SRNS), assumed management and operating responsibility for the Department of Energy's Savannah River Site located near Aiken, South Carolina, in August 2008. Under its contract, SRNS is responsible for environmental cleanup,

Note: This page contains sample records for the topic "river operations office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Record of Decision, Shutdown of the River Water System at the Savannah River Site, Savannah River Operations Office, Aiken, South Carolina  

Broader source: Energy.gov (indexed) [DOE]

6 6 Federal Register / Vol. 63, No. 18 / Wednesday, January 28, 1998 / Notices have to be addressed during dismantlement. The no action alternative would involve keeping the defueled S3G and D1G Prototype reactor plants in protective storage indefinitely. Since there is some residual radioactivity with long half-lives, such as nickel-59, in the defueled reactor plant, this alternative would leave some radioactivity at the Kesselring Site indefinitely. The Naval Reactors Program distributed the Draft Environmental Impact Statement on the Disposal of the S3G and D1G Prototype Reactor Plants in July 1997. Comments from 14 individuals and agencies were received in either oral or written statements at a public hearing or in comment letters. Approximately one-third of the commenters expressed a preference for

382

Integrated Hatchery Operations Team: Operations Plans for Anadromous Fish Production Facilities in the Columbia River Basin, Volume IV of IV; Washington: Rocky Reach Hatchery Addendum, 1992 Annual Report.  

SciTech Connect (OSTI)

Rocky Reach Hatchery is located along the Columbia Paver, just downstream from Rocky Reach Dam. Site elevation is 800 feet above sea level. The Turtle Rock Island facility, located 2 miles upstream, is operated as a satellite facility (shared with the Washington Department of Wildlife). The facility is staffed with 2.75 FTE`S. The hatchery was originally designed as a mile-long spawning channel at Turtle Rock Island. Rearing units consist of eight vinyl raceways at Rocky Reach and four rearing ponds at Turtle Rock. Water rights are held by Chelan County PUD and total 3,613 gpm from the Columbia River. Water available for use in the Turtle Rock rearing ponds averages 12,000 gpm from the Columbia River. Rocky Reach Hatchery and the Turtle Rock satellite facility are owned by Chelan County PUD. They are operated as mitigation facilities for the fishery impacts caused by the construction and operation of Rocky Reach Dam. Rocky Reach Hatchery is used for incubation and early rearing of upriver bright (URB) fall chinook. Fingerlings are later transferred to the Turtle Rock facility for final rearing and release.

Peck, Larry

1993-08-01T23:59:59.000Z

383

OFFICE OF NEPA POLICY AND COMPLIANCE - STAFF DIRECTORY | Department of  

Broader source: Energy.gov (indexed) [DOE]

OFFICE OF NEPA POLICY AND COMPLIANCE - STAFF DIRECTORY OFFICE OF NEPA POLICY AND COMPLIANCE - STAFF DIRECTORY OFFICE OF NEPA POLICY AND COMPLIANCE - STAFF DIRECTORY Carol Borgstrom, Director 202-586-4600 Carol.Borgstrom@hq.doe.gov Lettie Wormley, Secretary 202-586-4610 Lettie.Wormley@hq.doe.gov Eastern Energy and Waste Management Unit Contact Program/Responsibility Special Projects or Topics Brian Costner Brian.Costner@hq.doe.gov 202-586-9924 Unit Leader Yardena Mansoor Yardena.Mansoor@hq.doe.gov 202-586-9326 Office of Environmental Management * Oak Ridge Office * Savannah River Operations Office Office of Fossil Energy * Strategic Reserves * Liquefied Natural Gas (LNG) Office of Electricity Delivery and Energy Reliability * Champlain Hudson Power Express Western Area Power Administration Bonneville Power Administration

384

Office of Legal Counsel U.S. Department of Justice *1 GOVERNMENT OPERATIONS IN THE EVENT OF A  

Broader source: Energy.gov (indexed) [DOE]

95 WL 17216091 (O.L.C.) 95 WL 17216091 (O.L.C.) (Preliminary Print) Office of Legal Counsel U.S. Department of Justice *1 GOVERNMENT OPERATIONS IN THE EVENT OF A LAPSE IN APPROPRIATIONS August 16, 1995 A government agency may employ personal services in advance of appropriations only when there is a reasonable and articulable connection between the function to be performed and the safety of human life or the protection of property, and when there is some reasonable likelihood that either or both would be compromised in some significant degree by the delay in the performance of the function in question. MEMORANDUM OPINION FOR THE DIRECTOR OFFICE OF MANAGEMENT AND BUDGET This memorandum responds to your request to the Attorney General for advice regarding the permissible scope of

385

Audit of Electrical System Construction Projects at the Nevada Operations Office, WR-B-97-01  

Broader source: Energy.gov (indexed) [DOE]

ELECTRICAL SYSTEM CONSTRUCTION PROJECTS ELECTRICAL SYSTEM CONSTRUCTION PROJECTS AT THE NEVADA OPERATIONS OFFICE The Office of Inspector General wants to make the distribution of its reports as customer friendly and cost-effective as possible. Therefore, this report will be available electronically through the Internet five to seven days after publication at the following alternative addresses: Department of Energy Headquarters Gopher gopher.hr.doe.gov Department of Energy Headquarters Anonymous FTP vm1.hqadmin.doe.gov Department of Energy Human Resources and Administration Home Page http://www.hr.doe.gov/refshelf.html Your comments would be appreciated and can be provided on the Customer Response form attached to the report. This report can be obtained from the U.S. Department of Energy

386

Project Execution Plan, Waste Management Division, Nevada Operations Office, U.S. Department of Energy, April 2000  

SciTech Connect (OSTI)

This plan addresses project activities encompassed by the U.S. Department of Energy/Nevada Operations Office Waste Management Division and conforms to the requirements contained in the ''Life Cycle Asset Management,'' U.S. Department of Energy Order O430.1A; the Joint Program Office Policy on Project Management in Support of DOE Order O430.1, and the Project Execution and Engineering Management Planning Guide. The plan also reflects the milestone philosophies of the Federal Facility Agreement and Consent Order, as agreed to by the state of Nevada; and traditional project management philosophies such as the development of life cycle costs, schedules, and work scope; identification of roles and responsibilities; and baseline management and controls.

DOE /NV

2000-04-01T23:59:59.000Z

387

Environmental assessment for the construction, operation, and decommissioning of the Waste Segregation Facility at the Savannah River Site  

SciTech Connect (OSTI)

This Environmental Assessment (EA) has been prepared by the Department of Energy (DOE) to assess the potential environmental impacts associated with the construction, operation and decontamination and decommissioning (D&D) of the Waste Segregation Facility (WSF) for the sorting, shredding, and compaction of low-level radioactive waste (LLW) at the Savannah River Site (SRS) located near Aiken, South Carolina. The LLW to be processed consists of two waste streams: legacy waste which is currently stored in E-Area Vaults of SRS and new waste generated from continuing operations. The proposed action is to construct, operate, and D&D a facility to process low-activity job-control and equipment waste for volume reduction. The LLW would be processed to make more efficient use of low-level waste disposal capacity (E-Area Vaults) or to meet the waste acceptance criteria for treatment at the Consolidated Incineration Facility (CIF) at SRS.

NONE

1998-01-01T23:59:59.000Z

388

Savannah River Sites Liquid Waste Operations Adds Multi-Functional Laboratory  

Broader source: Energy.gov [DOE]

AIKEN, S.C. A new multi-functional laboratory supporting high-level waste processing at the Savannah River Site (SRS) gives workers a new and improved place to provide back-up laboratory support and more space for chemical storage.

389

Carlsbad Field Office Manager Selected  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Carlsbad Field Office Manager Selected CARLSBAD, N.M., November 10, 2011 - The U.S. Department of Energy's (DOE) Richland Operations Office (RL) Assistant Manager for the River Corridor Joe Franco was selected as Manager for the Carlsbad Field Office (CBFO), which oversees the Waste Isolation Pilot Plant (WIPP). CBFO Deputy Manager Ed Ziemianski has been acting in the CBFO Manager's position for the past year and will continue to serve as Deputy Manager. In operation since 1999, WIPP is a DOE facility designed to safely isolate defense-related transuranic (TRU) waste from people and the environment. Since 2006, Franco was responsible for cleanup and restoration of the 220 square miles of the

390

Continuous Energy Management of the HVAC&R System in an Office Building System Operation and Energy Consumption for the Eight Years after Building Completion  

E-Print Network [OSTI]

The authors continuously studied the energy consumption of a heating, ventilating, air- conditioning and refrigerating (HVAC&R) system in an office for the operation of the system in terms of its expected performance. A fault in the system control...

Akashi, Y.; Shinozaki, M.; Kusuda, R.; Ito, S.

2006-01-01T23:59:59.000Z

391

Environmental Assessment for the construction and operation of the Health Physics Site Support Facility on the Savannah River Site  

SciTech Connect (OSTI)

DOE has prepared an environmental assessment for the proposed construction and operation of the Health Physics Site Support Facility on the Savannah River Site. This (new) facility would meet requirements of the site radiological protection program and would ensure site compliance with regulations. It was determined that the proposed action is not a major Federal action significantly affecting the quality of the environment within the meaning of NEPA. Therefore, a finding of no significant impact is made, and no environmental impact statement is needed.

NONE

1995-07-01T23:59:59.000Z

392

SC Systems and Operations (SCSO) Division | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

SC Systems SC Systems and Operations (SCSO) Division Business Policy and Operations (BPO) BPO Home Leadership Organization Chart .pdf file (195KB) Business Management and Planning (BMP) Division SC Systems and Operations (SCSO) Division Contact Information Business Policy & Operations U.S. Department of Energy SC-45/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-0192 F: (301) 903-2481 More Information » SC Systems and Operations (SCSO) Division Print Text Size: A A A RSS Feeds FeedbackShare Page The SC Systems and Operations Division (SCSO) provides support for the SC HQ users in the areas of operations and maintenance for SC's network infrastructure, operational applications, cyber security, Science web sites and portals, COOP/ disaster recovery, IT property and asset management, and

393

References for radioactive releases to the Columbia River from Hanford Operations, 1944--1957  

SciTech Connect (OSTI)

A search was made for published documents related to discharges of radioactive material from Hanford Site facilities to the Columbia River from 1944--1957. The purpose was to list documents that contain data that might be useful in developing a source term for waterborne releases. Source term development work will take place in FY 1992, and FY 1993. This tabulation of published summaries of release data shows the type of measurements that were being made from 1944--1957 and the magnitude of discharges to the Columbia River. In the early years, very little data were collected that related to specific radionuclides. However, most of the key radionuclides were known to be present in effluents from occasional specific radionuclide analyses.

Hall, R.B.

1991-11-01T23:59:59.000Z

394

Evaluation of System Level Modeling and Simulation Tools in Support of Savannah River Site Liquid Waste Process  

Broader source: Energy.gov (indexed) [DOE]

Savannah River Site Liquid Waste Process Savannah River Site Liquid Waste Process June 2009 Monica C. Regalbuto Office of Waste Processing DOE/EM Kevin G. Brown Vanderbilt University and CRESP David W. DePaoli Oak Ridge National Laboratory Candido Pereira Argonne National Laboratory John R. Shultz Office of Waste Processing DOE/EM Sahid C. Smith Office of Waste Processing DOE/EM External Technical Review for Evaluation of System Level Modeling and Simulation Tools in Support of Savannah River Site Liquid Waste Process June 2009 ACKNOWLEDGEMENTS The Review Team thanks Ms. Sonitza Blanco, Team Lead Planning and Coordination Waste Disposition Project U.S. Department of Energy Savannah River Operations Office and Mr. Pete Hill, Liquid Waste Planning Manager for Washington Savannah River Company, for their

395

U.S. Department of Energy, Nevada Operations Office, environmental data report for the Nevada Test Site -- 1995  

SciTech Connect (OSTI)

The US Department of Energy (DOE) Order 5400.1, ``General Environmental Protection Program,`` establishes environmental protection program requirements, authorities, and responsibilities for DOE operations. These mandates require compliance with applicable federal, state, and local environmental protection regulations. During calendar year (CY) 1995 environmental protection and monitoring programs were conducted at the Nevada Test Site (NTS) and other DOE Nevada Operations Office (DOE/NV) managed sites in Nevada and across the United States. A detailed discussion of these environmental protection and monitoring programs, and summary data and assessments for environmental monitoring results at these sites in CY 1995 are provided in the DOE/NV, Annual Site Environmental Report--1995, (ASER) DOE/NV/11718-037. A brief description of the scope of this environmental monitoring is provided below, categorized by ``on-NTS`` and ``off-NTS`` monitoring.

Black, S.C.; Townsend, Y.E. [eds.; Kinnison, R.R.

1997-10-01T23:59:59.000Z

396

Operational Awarness at Hanford Tank Farms, April 2013  

Broader source: Energy.gov (indexed) [DOE]

HSS Independent Activity Report - HSS Independent Activity Report - Rev. 0 Report Number: HIAR-HANFORD-2013-04-15 Site: Hanford - Office of River Protection Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for Operational Awareness at the Hanford Tank Farms Dates of Activity : 04/15-26/2013 Report Preparer: Robert E. Farrell Activity Description/Purpose: The Office of Health, Safety and Security (HSS) Office of Safety and Emergency Management Evaluations (HS-45) Site Lead conducted an operational awareness visit to the Office of River Protection (ORP) to tour the Hanford Tank Farms, observe video inspection of single shell and double shell tanks, and observe Tank Farm project and staff meetings. Result:

397

Categorical Exclusion Determinations: Office of Energy Efficiency and  

Broader source: Energy.gov (indexed) [DOE]

2, 2011 2, 2011 CX-007008: Categorical Exclusion Determination Unique Lanthanide-Free Motor Construction CX(s) Applied: B3.6 Date: 09/22/2011 Location(s): Oak Ridge, Tennessee Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory September 22, 2011 CX-007006: Categorical Exclusion Determination Unique Lanthanide-Free Motor Construction CX(s) Applied: B3.6 Date: 09/22/2011 Location(s): Golden, Colorado Office(s): Energy Efficiency and Renewable Energy September 22, 2011 CX-007004: Categorical Exclusion Determination Unique Lanthanide-Free Motor Construction CX(s) Applied: B3.6 Date: 09/22/2011 Location(s): Ames, Iowa Office(s): Energy Efficiency and Renewable Energy, Savannah River Operations Office September 22, 2011 CX-006981: Categorical Exclusion Determination

398

Categorical Exclusion Determinations: Office of Energy Efficiency and  

Broader source: Energy.gov (indexed) [DOE]

8, 2011 8, 2011 CX-006928: Categorical Exclusion Determination Next Generation Inverter Design CX(s) Applied: B3.6 Date: 09/28/2011 Location(s): Oak Ridge, Tennessee Office(s): Energy Efficiency and Renewable Energy September 28, 2011 CX-006926: Categorical Exclusion Determination Next Generation Inverter Design CX(s) Applied: B3.6 Date: 09/28/2011 Location(s): Golden, Colorado Office(s): Energy Efficiency and Renewable Energy, Savannah River Operations Office September 28, 2011 CX-006921: Categorical Exclusion Determination Development of High Energy Density Lithium-Sulfur Cells CX(s) Applied: B3.6 Date: 09/28/2011 Location(s): Milwaukee, Wisconsin Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory September 28, 2011 CX-006919: Categorical Exclusion Determination

399

DOE/EIS-0279; Savannah River Site Spent Nuclear Fuel Management Final Environmental Impact Statement (March 2000)  

Broader source: Energy.gov (indexed) [DOE]

March 2000 Cover Sheet iii COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Savannah River Site, Spent Nuclear Fuel Management Final Environmental Impact Statement (DOE/EIS-0279) CONTACT: For additional information on this environmental impact statement, write or call: Andrew R. Grainger, NEPA Compliance Officer U.S. Department of Energy, Savannah River Operations Office, Building 742A, Room 183

400

2012 Annual Workforce Analysis and Staffing Plan Report- Richland Operations Office  

Broader source: Energy.gov [DOE]

Managers perform an annual workforce analysis of their organization and develop staffing plans that identify technical capabilities and positions they need to ensure safe operation of defense nuclear facilities.

Note: This page contains sample records for the topic "river operations office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

2012 Annual Workforce Analysis and Staffing Plan Report- Idaho Operations Office  

Broader source: Energy.gov [DOE]

Managers perform an annual workforce analysis of their organization and develop staffing plans that identify technical capabilities and positions they need to ensure safe operation of defense nuclear facilities.

402

2011 Annual Workforce Analysis and Staffing Plan Report- Richland Operations Office  

Broader source: Energy.gov [DOE]

Managers perform an annual workforce analysis of their organization and develop staffing plans that identify technical capabilities and positions they need to ensure safe operation of defense nuclear facilities.

403

2011 Annual Workforce Analysis and Staffing Plan Report- Idaho Operations Office  

Broader source: Energy.gov [DOE]

Managers perform an annual workforce analysis of their organization and develop staffing plans that identify technical capabilities and positions they need to ensure safe operation of defense nuclear facilities.

404

2013 Annual Workforce Analysis and Staffing Plan Report- Idaho Operations Office  

Broader source: Energy.gov [DOE]

Managers perform an annual workforce analysis of their organization and develop staffing plans that identify technical capabilities and positions they need to ensure safe operation of defense nuclear facilities.

405

2014 Annual Workforce Analysis and Staffing Plan Report- Idaho Operations Office  

Broader source: Energy.gov [DOE]

Managers perform an annual workforce analysis of their organization and develop staffing plans that identify technical capabilities and positions they need to ensure safe operation of defense nuclear facilities.

406

Management and Operating (M&O) Contracts | U.S. DOE Office of...  

Office of Science (SC) Website

IL 60439 P: (630) 252-2110 Larry Kelly U.S. Department of Energy 200 Administration Road Oak Ridge, TN 37830 P: (865) 576-0885 Acquisition and Assistance Management and Operating...

407

U.S. Department of Energy, Oak Ridge Operations Office Nuclear...  

Broader source: Energy.gov (indexed) [DOE]

Orders Self-Study Program Safety Basis Documentation Requirements in DOE O 5480.19, Conduct of Operations Requirements for DOE Facilities Cross-referenced to DOE O 422.1,...

408

2013 Annual Workforce Analysis and Staffing Plan Report- Richland Operations Office  

Broader source: Energy.gov [DOE]

Managers perform an annual workforce analysis of their organization and develop staffing plans that identify technical capabilities and positions they need to ensure safe operation of defense nuclear facilities.

409

2014 Annual Workforce Analysis and Staffing Plan Report- Richland Operations Office  

Broader source: Energy.gov [DOE]

Managers perform an annual workforce analysis of their organization and develop staffing plans that identify technical capabilities and positions they need to ensure safe operation of defense nuclear facilities.

410

Savannah River Site | National Nuclear Security Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Site | National Nuclear Security Administration Site | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Our Locations > Savannah River Site Savannah River Site http://www.srs.gov/general/srs-home.html Field Office: Located south of Aiken, South Carolina, the Savannah River Field Office (SRFO) is responsible for the NNSA Defense Program missions at

411

Savannah River Site | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Site | National Nuclear Security Administration Site | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Our Locations > Savannah River Site Savannah River Site http://www.srs.gov/general/srs-home.html Field Office: Located south of Aiken, South Carolina, the Savannah River Field Office (SRFO) is responsible for the NNSA Defense Program missions at

412

Savannah River Tank Waste Residuals  

Broader source: Energy.gov (indexed) [DOE]

Savannah Savannah River Savannah River Tank Waste Residuals HLW Corporate Board November 6, 2008 1 November 6, 2008 Presentation By Sherri R. Ross Department of Energy Savannah River Operations Office The Issue * How clean is clean? * Ultimate Challenge - Justify highly radioactive radionuclides have been removed to the maximum extent practical? 2 removed to the maximum extent practical? - Building compelling regulatory documentation that will withstand intense scrutiny §3116 Requirements 1. Does not require disposal in deep geological repository 2. Highly radioactive radionuclides removed to the maximum extent practical 3. Meet the performance objectives in 10 CFR Part 3 3. Meet the performance objectives in 10 CFR Part 61, Subpart C 4. Waste disposed pursuant to a State-approved closure plan or permit Note: If it is anticipated that Class C disposal limits will be exceeded, additional

413

Report on Matters Identified at the Richland Operations Office During the Audit of the Department's Consolidated Statement of Financial Position as of September 30, 1995, WR-FS-96-01  

Broader source: Energy.gov (indexed) [DOE]

DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY OFFICE OF INSPECTOR GENERAL REPORT ON MATTERS IDENTIFIED AT THE RICHLAND OPERATIONS OFFICE DURING THE AUDIT OF THE DEPARTMENTmS CONSOLIDATED STATEMENT OF FINANCIAL POSITION AS OF SEPTEMBER 30, 1995

414

Report on Matters Identified at the Richland Operations Office During the Audit of the Department's Consolidated Fiscal Year 1996 Financial Statements, WR-FS-97-04  

Broader source: Energy.gov (indexed) [DOE]

REPORT ON MATTERS IDENTIFIED AT THE RICHLAND OPERATIONS OFFICE DURING THE AUDIT OF THE DEPARTMENT S CONSOLIDATED FISCAL YEAR 1996 FINANCIAL STATEMENTS The Office of Inspector General wants to make the distribution of its audit reports as customer friendly and cost effective as possible. Therefore, this report will be available electronically through the Internet five to seven days after publication at the following alternative addresses: Department of Energy Headquarters Gopher gopher.hr.doe.gov

415

Simulation Support for Optimizing the Design and Operation of a Large Open-Space Office Building  

E-Print Network [OSTI]

University of Technology PBA International Mech. Eng. Faculty Building Physics & Systems Prague 7 Prague 6, Czech Republic Eindhoven, Netherlands Czech Republic ABSTRACT This paper deals with design and post-design operational optimization studies... inverters. Some of the air is extracted ESL-IC-08-10-74 Proceedings of the Eighth International Conference for Enhanced Building Operations, Berlin, Germany, October 20-22, 2008 20 22 24 26 28 30 32 34 12.7 13.7 14.7 15.7 16.7 17.7 18.7 19.7 A i r t e m...

Lain, M.; Hensen, J.; Zemlicka, J.

416

John C. Barnes of Savannah River Operations named 2012 Facility Representative of the Year  

Broader source: Energy.gov [DOE]

About 200 Department of Energy (DOE) federal employees are Facility Representatives (FR) who provide day-to-day oversight of contractor operations at DOE facilities. Each year the Department...

417

Business Operations  

Office of Energy Efficiency and Renewable Energy (EERE)

The Office of Business Operations is the central organization for all Office of Energy Efficiency and Renewable Energy (EERE) business products, processes, and systems. The three main offices of...

418

EIS-0082: Defense Waste Processing Facility, Savannah River Plant  

Broader source: Energy.gov [DOE]

The Office of Defense Waste and Byproducts Management developed this EIS to provide environmental input into both the selection of an appropriate strategy for the permanent disposal of the high-level radioactive waste currently stored at the Savannah River Plant (SRP) and the subsequent decision to construct and operate a Defense Waste Processing Facility at the SRP site.

419

Environmental assessment for the expansion and operation of the Central Shops Borrow Pit at the Savannah River Site  

SciTech Connect (OSTI)

The Department of Energy (DOE) prepared this Environmental Assessment (EA) to assess the potential environmental impacts of the proposed expansion and operation of an existing borrow pit at the Savannah River Site (SRS), located near Aiken, South Carolina. A borrow pit is defined as an excavated area where material has been dug for use as fill at another location. The proposed action would entail the areal enlargement, continued operation, and eventual close-out of the established facility known as the Central Shops Borrow Pit. Operations at SRS supporting waste site closure and the construction and maintenance of site facilities and infrastructure require readily available suitable soil for use as fill material. With the recent depletion of the other existing on-site sources for such material, DOE proposes to expand the existing facility. The National Environmental Policy Act requires the assessment of environmental consequences of Federal actions that may affect the quality of the human environment. Based on the potential for impacts described herein, DOE will either publish a Finding of No Significant Impact or prepare an Environmental Impact Statement (EIS).

NONE

1997-03-01T23:59:59.000Z

420

35 COFibE, Series A. U. S. ATOXIC ENERGY CCMMISSION r'C Cj NE# YORK OPERATIONS OFFICE  

Office of Legacy Management (LM)

COFibE, Series A. COFibE, Series A. - U. S. ATOXIC ENERGY CCMMISSION r'C Cj NE# YORK OPERATIONS OFFICE HEkLTH AND SAFETY DIVISION (Merril Eicsnbud, Dirsator) MONTHLY REPORT OF FIELD ACTIVITIES (This report%v,rs%~~~nth period) Indusorial Ii~iene Branoh m a . . 0 . . c . . . o W. B. Harris, Chief Radiation Branch . y y e 0e . e . e . . . . e . . . Hanson Blatz, Chief Fi:e and Accident Branch D e a o o . . . ..s . . B. J. Kehoe, Chief Medical Advioer, Dr. J. A. Quiglsy Siometrician, Dr. A. E. Brandt TABLF OF COEpTmS PRODUCTION COWTRACTORS ._ Feed Nabrlals Production Centor '$iiddlcsexSampling Plnnt Harshaw ChuoicalCompa~ Wlin&rodt Chen!icrl Works tie. Ontario Storage Area b Vit*o Mnufacturing CompaW B4ikhem Steel F'lrnt - IpcknuMnr Clifton Roducts CompvIy Drush Bcx@.Uun~ Company - Luckcy

Note: This page contains sample records for the topic "river operations office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Preliminary remediation goals for use at the U.S. Department of Energy Oak Ridge Operations Office  

SciTech Connect (OSTI)

This report presents Preliminary Remediation Goals (PRGs) for use in human health risk assessment efforts under the United States Department of Energy, Oak Ridge Operations Office Environmental Restoration (ER) Division. Chemical-specific PRGs are concentration goals for individual chemicals for specific medium and land use combinations. The PRGs are referred to as risk-based because they have been calculated using risk assessment procedures. Risk-based calculations set concentration limits using both carcinogenic or noncarcinogenic toxicity values under specific exposure pathways. The PRG is a concentration that is derived from a specified excess cancer risk level or hazard quotient. This report provides the ER Division with standardized PRGs which are integral to the Remedial Investigation/Feasibility Study process. By managing the assumptions and systems used in PRG derivation, the Environmental Restoration Risk Assessment Program will be able to control the level of quality assurance associated with these risk-based guideline values.

NONE

1995-06-01T23:59:59.000Z

422

Preliminary remediation goals for use at the US Department of Energy Oak Ridge Operations Office. Revision 1  

SciTech Connect (OSTI)

This technical memorandum presents Preliminary Remediation Goals (PRGs) for use in human health risk assessment efforts under the United States Department of Energy, Oak Ridge Operations Office Environmental Restoration (ER) Division. This document provides the ER Division with standardized PRGs which are integral to the Remedial Investigation/Feasibility Study process. They are used during project scooping (Data Quality Objectives development), in screening level risk assessments to support early action or No Further Investigation decisions, and in the baselines risk assessment where they are employed in the selection of chemicals of potential concern. The primary objective of this document is to standardize these values and eliminate any duplication of effort by providing PRGs to all contractors involved in risk activities. In addition, by managing the assumptions and systems used in PRG derivation, the ER Risk Assessment Program will be able to control the level of quality assurance associated with these risk-based guideline values.

NONE

1996-05-01T23:59:59.000Z

423

Office for Analysis and Evaluation of Operational Data 1996 annual report. Volume 10, Number 3: Technical training  

SciTech Connect (OSTI)

This annual report of the US Nuclear Regulatory Commission`s Office for Analysis and Evaluation of Operational Data (AEOD) describes activities conducted during 1996. The report is published in three parts. NUREG-1272, Vol. 10, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports and reports to the NRC`s Operations Center. NUREG-1272, Vol. 10, No. 2, covers nuclear materials and presents a review of the events and concerns during 1996 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. Both reports also contain a discussion of the Incident Investigation Team program and summarize both the Incident Investigation Team and Augmented Inspection Team reports. Each volume contains a list of the AEOD reports issued from CY 1980 through 1996. NUREG-1272, Vol. 10, No. 3, covers technical training and presents the activities of the Technical Training Center in support of the NRC`s mission in 1996.

NONE

1997-12-01T23:59:59.000Z

424

Office for Analysis and Evaluation of Operational Data 1992 annual report: Power reactors. Volume 7, No. 1  

SciTech Connect (OSTI)

The annual report of the US Nuclear Regulatory Commission`s Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during 1992. The report is published in two separate parts. NUREG-1272, Vol. 7, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about the trends of some key performance, measures. The report also includes the principal findings and issues identified in AEOD studies over the past year, and summarizes information from such sources as licensee event report% diagnostic evaluations, and reports to the NRC`s Operations Center. The reports contain a discussion of the Incident Investigation Team program and summarize the Incident Investigation Team and Augmented Inspection Team reports for that group of licensees. NUREG-1272, Vol. 7, No. 2, covers nonreactors and presents a review of the events and concerns during 1992 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. Each volume contains a list of the AEOD reports issued for 1984--1992.

none,

1993-07-01T23:59:59.000Z

425

Office of Inspector General report on audit of Department of Energy management and operating contractor available fees  

SciTech Connect (OSTI)

The Office of Procurement and Assistance Management has proposed changes to the method used to annually calculate and negotiate ``for profit`` management and operating contractor available fees. This proposal will increase contractor fees in exchange for the contractor`s purported assumption of additional risk. In 1991, the Department, through the Accountability Rule, increased contractor fees as an incentive to improve contractor performance and accountability. Despite the lack of measurable benefits of this effort, the Department is crafting a new fee policy which will, depending upon how it is executed, increase fees above the amount provided through the Accountability Rule as an incentive to the Department`s management and operating contractors. The objective of the audit was to determine whether the Department`s proposed change to the fee structure for determining management and operating contractor fees will be cost effective. This report describes the study`s approach, its findings and recommendations, management and auditor comments, and includes appendices with further data.

NONE

1996-05-01T23:59:59.000Z

426

Implemntation of the Recovery Act at the Savannah River Site  

Broader source: Energy.gov (indexed) [DOE]

Implementation of the Recovery Act Implementation of the Recovery Act at the Savannah River Site OAS-RA-L-11-12 September 2011 Department of Energy Washington, DC 20585 September 29, 2011 MEMORANDUM FOR THE MANAGER, SAVANNAH RIVER OPERATIONS OFFICE FROM: Daniel M. Weeber, Director Environment, Technology, and Corporate Audits Division Office of Inspector General SUBJECT: INFORMATION: Audit Report on "Implementation of the Recovery Act at the Savannah River Site" Audit Report Number: OAS-RA-L-11-12 BACKGROUND The American Recovery and Reinvestment Act of 2009 (Recovery Act) provided the Department of Energy (Department) $5.1 billion for Defense Environmental Cleanup. These funds have afforded the Department's Office of Environmental Management (EM) the opportunity to reduce

427

The Savannah River Site's liquid radioactive waste operations involves the man  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Site's liquid radioactive waste operations involves the management of space in the Site's Site's liquid radioactive waste operations involves the management of space in the Site's 49 underground waste tanks, including the removal of waste materials. Once water is removed from the waste tanks, two materials remain: salt and sludge waste. Removing salt waste, which fills approximately 90 percent of the tank space in the SRS tank farms, is a major step toward closing the Site's waste tanks that currently contain approximately 38 million gallons of waste. Due to the limited amount of tank space available in new-style tanks, some salt waste must be dispositioned in the interim to ensure sufficient tank space for continued sludge washing and to support the initial start-up and salt processing operations at the Salt Waste Processing Facility (SWPF).

428

River Protection.PDF  

Broader source: Energy.gov (indexed) [DOE]

cc: cc: DOE/IG-0506 I N S P E C T I O N R E P O R T U.S. DEPARTMENT OF ENERGY OFFICE OF INSPECTOR GENERAL OFFICE OF INSPECTIONS I N S P E C T I O N O F SELECTED ASPECTS OF THE OFFICE OF RIVER PROTECTION PERFORMANCE-BASED INCENTIVE PROGRAM JUNE 2001 U.S. DEPARTMENT OF ENERGY Washington, DC 20585 June 14, 2001 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman /s/ Inspector General SUBJECT: INFORMATION: Report on "Inspection of Selected Aspects of the Office of River Protection Performance-Based Incentive Program" BACKGROUND The Office of River Protection (ORP), which reports to the Office of Environmental Management, is responsible for remediation of the radioactive waste stored in tanks at the Hanford Site in the State of Washington. For Fiscal Year (FY) 2000, ORP established 26 performance-based contract

429

Crystallization In High Level Waste (HLW) Glass Melters: Operational Experience From The Savannah River Site  

SciTech Connect (OSTI)

processing strategy for the Hanford Tank Waste Treatment and Immobilization Plant (WTP). The basis of this alternative approach is an empirical model predicting the crystal accumulation in the WTP glass discharge riser and melter bottom as a function of glass composition, time, and temperature. When coupled with an associated operating limit (e.g., the maximum tolerable thickness of an accumulated layer of crystals), this model could then be integrated into the process control algorithms to formulate crystal tolerant high level waste (HLW) glasses targeting higher waste loadings while still meeting process related limits and melter lifetime expectancies. This report provides a review of the scaled melter testing that was completed in support of the Defense Waste Processing Facility (DWPF) melter. Testing with scaled melters provided the data to define the DWPF operating limits to avoid bulk (volume) crystallization in the un-agitated DWPF melter and provided the data to distinguish between spinels generated by K-3 refractory corrosion versus spinels that precipitated from the HLW glass melt pool. This report includes a review of the crystallization observed with the scaled melters and the full scale DWPF melters (DWPF Melter 1 and DWPF Melter 2). Examples of actual DWPF melter attainment with Melter 2 are given. The intent is to provide an overview of lessons learned, including some example data, that can be used to advance the development and implementation of an empirical model and operating limit for crystal accumulation for WTP. Operation of the first and second (current) DWPF melters has demonstrated that the strategy of using a liquidus temperature predictive model combined with a 100 C offset from the normal melter operating temperature of 1150 C (i.e., the predicted liquidus temperature (TL) of the glass must be 1050 C or less) has been successful in preventing any detrimental accumulation of spinel in the DWPF melt pool, and spinel has not been observed in any of the pour stream glass samples. Spinel was observed at the bottom of DWPF Melter 1 as a result of K-3 refractory corrosion. Issues have occurred with accumulation of spinel in the pour spout during periods of operation at higher waste loadings. Given that both DWPF melters were or have been in operation for greater than 8 years, the service life of the melters has far exceeded design expectations. It is possible that the DWPF liquidus temperature approach is conservative, in that it may be possible to successfully operate the melter with a small degree of allowable crystallization in the glass. This could be a viable approach to increasing waste loading in the glass assuming that the crystals are suspended in the melt and swept out through the riser and pour spout. Additional study is needed, and development work for WTP might be leveraged to support a different operating limit for the DWPF. Several recommendations are made regarding considerations that need to be included as part of the WTP crystal tolerant strategy based on the DWPF development work and operational data reviewed here. These include: Identify and consider the impacts of potential heat sinks in the WTP melter and glass pouring system; Consider the contributions of refractory corrosion products, which may serve to nucleate additional crystals leading to further accumulation; Consider volatilization of components from the melt (e.g., boron, alkali, halides, etc.) and determine their impacts on glass crystallization behavior; Evaluate the impacts of glass REDuction/OXidation (REDOX) conditions and the distribution of temperature within the WTP melt pool and melter pour chamber on crystal accumulation rate; Consider the impact of precipitated crystals on glass viscosity; Consider the impact of an accumulated crystalline layer on thermal convection currents and bubbler effectiveness within the melt pool; Evaluate the impact of spinel accumulation on Joule heating of the WTP melt pool; and Include noble metals in glass melt experiments because of their potential to act as nucleation site

Fox, K. M.

2014-02-27T23:59:59.000Z

430

DEPARTMENT OF ENERGY OFFICE OF HEARINGS AND APPEALS Appeal  

Broader source: Energy.gov (indexed) [DOE]

3, 2007 3, 2007 DEPARTMENT OF ENERGY OFFICE OF HEARINGS AND APPEALS Appeal Name of Case: Fredrick Abbott Date of Filing: February 21, 2007 Case Number: TBU-0062 Fredrick Abbott (the complainant or Abbott), appeals the dismissal of his complaint of retaliation filed under 10 C.F.R. Part 708, the Department of Energy (DOE) Contractor Employee Protection Program. As explained below, I have determined that the dismissal of the complaint should be sustained and the appeal denied. I. Background The complainant is an employee with Washington Savannah River Company (WSRC), which operates the DOE's Savannah River site located in Aiken, South Carolina. Pursuant to Part 708, on April 13, 2006, he filed a complaint of retaliation against WSRC with the DOE's Savannah River Operations Office. In his complaint,

431

2013 Federal Energy and Water Management Award Winner 22nd Operations Group Fuel Efficiency Office  

Broader source: Energy.gov (indexed) [DOE]

E ciency O ce E ciency O ce U.S. Air Force McConnell Air Force Base, Kansas During FY 2012, the 22nd Operations Group Fuel E ciency O ce (FEO) designed and implemented multiple measures, including a focus on institutional culture change, to reduce ine ciency in fuel management of the KC-135 aircraft and save the Air Force $4.3 million during a 42 percent rise in local sorties (the deployment of aircraft for missions of national defense or aircrew proficiency). These e orts included reducing KC-135 landing fuel by 5000 lb per sortie to save 1.94 million gallons per year; changing the KC-135 standard landing configuration to save 50 lb of fuel per approach; and implementing a new training configuration to reduce aircraft basic weight by 1,600 lb. The FEO also incorporated Mission Index Flying

432

US Department of Energy Nevada Operations Office annual site environmental report, 1992. Volume 1  

SciTech Connect (OSTI)

This report contains the environmental monitoring and assessment results for the Nevada Test Site for 1992. Monitoring and surveillance on and around the NTS by DOE contractors and Site user organizations during 1992 indicated that underground nuclear testing operations were conducted in compliance with regulations, i.e., the dose the maximally exposed offsite individual could have received was less than 0.15 percent of the guideline for air exposure. All 1992 nuclear events took place during the first three quarters of the calendar year prior to the Congressional testing moratorium. All discharges of radioactive liquids remained onsite in containment ponds, and there was no indication of potential migration of radioactivity to the offsite area through groundwater. Surveillance around the NTS indicated that airborne radioactivity from test operations was not detectable offsite, and no measurable net exposure to members of the offsite population was detected through the offsite dosimetry program. Using the CAP88-PC model and NTS radionuclide emissions data, the calculated maximum effective dose equivalent offsite would have been 0.012 mrem. Any person receiving this dose was also exposed to 78 mrem from natural background radiation. There were no nonradiological releases to the offsite area. Hazardous wastes were shipped to EPA-approved disposal facilities. Compliance with the various regulations stemming from the National Environmental Policy Act is being achieved and, where mandated, permits for air and water discharges and waste management have been obtained from the appropriate agencies. Non-NTS support facilities complied with the requirements of air quality permits and state or local wastewater discharge and hazardous waste permits.

Black, S.C.; Latham, A.R.; Townsend, Y.E. [eds.

1993-09-01T23:59:59.000Z

433

Office of the Director  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Dr. Bochenek, G. Deputy: Klara, S. Chief Operating Officer: Zeh, C. Senior Operations Advisor: Monahan, M. SMTA: Duda, J. EEO Manager: Vargas, N. Supervisory Administrative...

434

US Department of Energy Nevada Operations Office annual site environmental report: 1993. Volume 1  

SciTech Connect (OSTI)

Monitoring and surveillance on and around the Nevada Test Site (NTS) by DOE contractors and NTS user organizations during 1993 indicated that operations on the NTS were conducted in compliance with applicable federal and DOE guidelines, i.e., the dose the maximally exposed offsite individual could have received was less than 0.04 percent of the 10 mrem per year guide for air exposure. No nuclear tests were conducted due to the moratorium. All discharges of radioactive liquids remained onsite in containment ponds, and there was no indication of potential migration of radioactivity to the offsite area through groundwater. Surveillance around the NTS indicated that airborne radioactivity from diffusion, evaporation of effluents, or resuspension was not detectable offsite, and no measurable net exposure to members of the offsite population was detected through the offsite dosimetry program. Using the CAP88-PC model and NTS radionuclide emissions data, the calculated effective dose equivalent to the maximally exposed individual offsite would have been 0.004 mrem. Any person receiving this dose would also have received 97 mrem from natural background radiation. There were no nonradiological releases to the offsite area. Hazardous wastes were shipped offsite to approved disposal facilities. Compliance with the various regulations stemming from the National Environmental Policy Act is being achieved and, where mandated, permits for air and water discharges and waste management have been obtained from the appropriate agencies. Support facilities at off-NTS locations compiled with the requirements of air quality permits and state or local wastewater discharge and hazardous waste permits.

Black, S.C.; Glines, W.M.; Townsend, Y.E. [eds.

1994-09-01T23:59:59.000Z

435

NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC.  

E-Print Network [OSTI]

% post consumer waste. #12;iii Acknowledgments This work was funded by the U.S. Department of EnergyNREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. Contract No. DE-AC36-08GO28308 Using

436

NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC.  

E-Print Network [OSTI]

% post consumer waste. #12;iii Acknowledgments This work was funded by the U.S. Department of EnergyNREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. Contract No. DE-AC36-08GO28308

437

NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC.  

E-Print Network [OSTI]

NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. Contract No. DE-AC36-08GO28308 Feasibility Study of Economics and Performance of Biopower at the Chanute Air Force Base in Rantoul, Illinois

438

DOE/EA-1538; Environmental Assessment for the Safeguards and Security Upgrades for the Storage of Plutonium Materials at the Savannah River Site  

Broader source: Energy.gov (indexed) [DOE]

8 8 December 2005 U. S. DEPARTMENT OF ENERGY SAVANNAH RIVER OPERATIONS OFFICE SAVANNAH RIVER SITE ENVIRONMENTAL ASSESSMENT FOR THE SAFEGUARDS AND SECURITY UPGRADES FOR STORAGE OF PLUTONIUM MATERIALS AT THE SAVANNAH RIVER SITE DOE/EA-1538 ENVIRONMENTAL ASSESSMENT FOR THE SAFEGUARDS AND SECURITY UPGRADES FOR STORAGE OF PLUTONIUM MATERIALS AT THE SAVANNAH RIVER SITE December 2005 U. S. DEPARTMENT OF ENERGY SAVANNAH RIVER OPERATIONS OFFICE SAVANNAH RIVER SITE ii This page is intentionally left blank iii TABLE OF CONTENTS Page 1.0 INTRODUCTION 1 1.1 Background 1 1.2 Purpose and Need for Action 3 2.0 PROPOSED ACTION AND ALTERNATIVES 3 2.1 Proposed Action 3 2.1.1 Modified Storage Capability within K Area for

439

Assessment of the Plutonium Finishing Plant Criticality Alarm System U.S. Department of Energy Richland Operations Office  

SciTech Connect (OSTI)

At the request of the Assistant Manager for Safety and Engineering, the U.S. Department of Energy Richland Operations Office (RL) Engineering Support Division, performed an oversight review of the Plutonium Finishing Plant (PFP) nuclear Criticality Alarm System (CAS). The review was conducted to satisfy requirements and agreements associated with Defense Nuclear Facility Safety Board (DNFSB) Recommendation 2000-2, ''Vital Safety Systems.'' The PFP is managed by Fluor Hanford, Inc. for RL. The field assessment and staff interviews were conducted August 12 through August 19,2002. This was a limited scope assessment that consisted of a review of the nuclear CAS operations, maintenance, and compliance with National Consensus Standards Requirements. The main purpose of the assessment was to determine the adequacy of the existing alarm system and its associated infrastructure to support the PFP facility mission through the remaining facility lifetime. The Review Plan was modeled upon Criteria and Review Approach Documents (CRAD) developed for DNFSB Recommendation 2000-2 reviews conducted across the Hanford Site. Concerns regarding component degradation and failure, increasing numbers of occurrence reports associated with the alarm system, and reliability issues were addressed. Additionally, RL performed a review of the engineering aspects of the CAS including the functions of design authorities and aspects of systems engineering. However, the focus of the assessment was on operations, maintenance, and reliability of the CAS, associated procurement practices, adequacy of safety and engineering policies and procedures, safety documentation, and fundamental engineering practices including training, qualification, and systems engineering. This assessment revealed that the PFP CAS and its associated infrastructure, administrative procedures, and conduct of operations are generally effective. There are no imminent criticality safety issues associated with the operation of the existing CAS. The Assessment Team believes that the CAS, as it presently exists at the PFP facility, is adequate to support the remaining mission lifetime of the facility while continuing to ensure personnel safety. This conclusion is dependent upon a continued level of funding adequate to support the required maintenance and occasional system upgrade. Two findings were identified during this assessment. Additionally, the report identified eight observations and two recommendations. The assessment revealed that recent changes to OSR compliance procedures and other documents do not contain the signature of the CSR as required by procedure. Lack of appropriate approval signatures is a noncompliance with site-level procedures.

NIRIDER, L.T.

2002-10-01T23:59:59.000Z

440

Final Environmental Impact Statement Waste Management Activities for Groundwater Protection Savannah River Plant Aiken, South Carolina  

Broader source: Energy.gov (indexed) [DOE]

Els-o120 Els-o120 Final Environmental Impact Statement I Waste Management Activities for Groundwater Protection Savannah River Plant Aiken, South Carolina of Energy 1 COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy ACTIVITY: Final Environmental Impact Statement, Waste Management I TC Activities for Groundwater Protection at the Savannah River Plant, Aiken, South Carolina. CONTACT: ABSTRACT: Additional information concerning this Statement can be obtained from: Mr. S. R. Wright Director, Environmental Division U.S. Department of Energy Savannah River Operations Office Post Office Box A Aiken, South Carolina 29802 (803) 725-3957 I TC For general information on the Department of Energy qs EIS process contact: Office of the Assistant Secretary for Environment, Safety, and Health U.S. Department of Energy Attn: Ms. Carol Bergstrom (EH-25) Acting Director, Office of

Note: This page contains sample records for the topic "river operations office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

CAUSTIC SIDE SOLVENT EXTRACTION AT THE SAVANNAH RIVER SITE OPERATING EXPERIENCE AND LESSONS LEARNED  

SciTech Connect (OSTI)

The Modular Caustic-Side Solvent Extraction Unit (MCU) is the first, production-scale Caustic-Side Solvent Extraction process for cesium separation to be constructed. The process utilizes an engineered solvent to remove cesium from waste alkaline salt solution resulting from nuclear processes. While the application of this solvent extraction process is unique, the process uses commercially available centrifugal contactors for the primary unit operation as well as other common methods of physical separation of immiscible liquids. The fission product, cesium-137, is the primary focus of the process due to the hazards associated with its decay. The cesium is extracted from the waste, concentrated, and stripped out of the solvent resulting in a low-level waste salt solution and a concentrated cesium nitrate stream. The concentrated cesium stream can be vitrified into borosilicate glass with almost no increase in glass volume, and the salt solution can be dispositioned as a low-level grout. The unit is deployed as an interim process to disposition waste prior to start-up of the Salt Waste Processing Facility. The Salt Waste Processing Facility utilizes the same cesium removal technology, but will treat more contaminated waste. The MCU is not only fulfilling a critical need, it is the first demonstration of the process at production-scale.

Brown, S.

2010-01-06T23:59:59.000Z

442

EA-1606: Proposed Use of Savannah River Site Lands for Military Training,  

Broader source: Energy.gov (indexed) [DOE]

06: Proposed Use of Savannah River Site Lands for Military 06: Proposed Use of Savannah River Site Lands for Military Training, South Carolina EA-1606: Proposed Use of Savannah River Site Lands for Military Training, South Carolina Summary This EA evaluates the environmental impacts of a proposal for the Department of Defense and Department of Homeland Security to use the Savannah River Site, near Aiken, South Carolina, for military training purposes. For more information, contact: Mr. Andrew R. Grainger NEPA Compliance Officer U. S. Department of Energy Savannah River Operations Office Building 730-1B, Room 3150 Aiken, SC 29808 Telephone: 803-952-8001 Fax/telephone: 1-800-881-7292 Electronic mail: nepa@srs.gov Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download

443

Principal Media Contact: DT Townsend Savannah River Nuclear Solutions, LLC  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NNSA Honors 41 Savannah River Site Employees with Defense NNSA Honors 41 Savannah River Site Employees with Defense Programs Awards of Excellence AIKEN, S.C. (September 20, 2013) - Forty-one Savannah River Nuclear Solutions employ- ees were honored for excellence in support of the National Nuclear Security Administration's Defense Programs. Doug Dearolph, manager of the NNSA Savannah River Field Office presented NNSA Defense Programs Awards of Excellence to one individual and two teams for their "signif- icant achievement in quality, productivity, cost savings, safety, or creativity in support of NNSA's nuclear weapons program." Honorees included Rick Poland of Savannah River National Laboratory, the Tritium Control Room Operator Training Team, and the B83 Alt 353 Implementation Team. Poland was honored for his multi-year work as Director of the Federal Working Group on

444

Lempke visits Savannah River Site | National Nuclear Security  

National Nuclear Security Administration (NNSA)

visits Savannah River Site | National Nuclear Security visits Savannah River Site | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > Lempke visits Savannah River Site Lempke visits Savannah River Site Posted By Office of Public Affairs NNSA Associate Principal Deputy Administrator Michael Lempke recently visited the Savannah River Site, getting an up-close look at facilities

445

Savannah River Nuclear Solutions awards family scholarships | National  

National Nuclear Security Administration (NNSA)

Savannah River Nuclear Solutions awards family scholarships | National Savannah River Nuclear Solutions awards family scholarships | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > Savannah River Nuclear Solutions awards family scholarships Savannah River Nuclear Solutions awards family scholarships Posted By Office of Public Affairs Savannah River Nuclear Solutions awards family scholarships

446

Effects of Hydroelectric Dam Operations on the Restoration Potential of Snake River Fall Chinook Salmon (Oncorhynchus tshawytscha) Spawning Habitat Final Report, October 2005 - September 2007.  

SciTech Connect (OSTI)

This report describes research conducted by the Pacific Northwest National Laboratory for the Bonneville Power Administration (BPA) as part of the Fish and Wildlife Program directed by the Northwest Power and Conservation Council. The study evaluated the restoration potential of Snake River fall Chinook salmon spawning habitat within the impounded lower Snake River. The objective of the research was to determine if hydroelectric dam operations could be modified, within existing system constraints (e.g., minimum to normal pool levels; without partial removal of a dam structure), to increase the amount of available fall Chinook salmon spawning habitat in the lower Snake River. Empirical and modeled physical habitat data were used to compare potential fall Chinook salmon spawning habitat in the Snake River, under current and modified dam operations, with the analogous physical characteristics of an existing fall Chinook salmon spawning area in the Columbia River. The two Snake River study areas included the Ice Harbor Dam tailrace downstream to the Highway 12 bridge and the Lower Granite Dam tailrace downstream approximately 12 river kilometers. These areas represent tailwater habitat (i.e., riverine segments extending from a dam downstream to the backwater influence from the next dam downstream). We used a reference site, indicative of current fall Chinook salmon spawning areas in tailwater habitat, against which to compare the physical characteristics of each study site. The reference site for tailwater habitats was the section extending downstream from the Wanapum Dam tailrace on the Columbia River. Fall Chinook salmon spawning habitat use data, including water depth, velocity, substrate size and channelbed slope, from the Wanapum reference area were used to define spawning habitat suitability based on these variables. Fall Chinook salmon spawning habitat suitability of the Snake River study areas was estimated by applying the Wanapum reference reach habitat suitability criteria to measured and modeled habitat data from the Snake River study areas. Channel morphology data from the Wanapum reference reach and the Snake River study areas were evaluated to identify geomorphically suitable fall Chinook salmon spawning habitat. The results of this study indicate that a majority of the Ice Harbor and Lower Granite study areas contain suitable fall Chinook salmon spawning habitat under existing hydrosystem operations. However, a large majority of the currently available fall Chinook salmon spawning habitat in the Ice Harbor and Lower Granite study areas is of low quality. The potential for increasing, through modifications to hydrosystem operations (i.e., minimum pool elevation of the next downstream dam), the quantity or quality of fall Chinook salmon spawning habitat appears to be limited. Estimates of the amount of potential fall Chinook salmon spawning habitat in the Ice Harbor study area decreased as the McNary Dam forebay elevation was lowered from normal to minimum pool elevation. Estimates of the amount of potential fall Chinook salmon spawning habitat in the Lower Granite study area increased as the Little Goose Dam forebay elevation was lowered from normal to minimum pool elevation; however, 97% of the available habitat was categorized within the range of lowest quality. In both the Ice Harbor and Lower Granite study areas, water velocity appears to be more of a limiting factor than water depth for fall Chinook salmon spawning habitat, with both study areas dominated by low-magnitude water velocity. The geomorphic suitability of both study areas appears to be compromised for fall Chinook salmon spawning habitat, with the Ice Harbor study area lacking significant bedforms along the longitudinal thalweg profile and the Lower Granite study area lacking cross-sectional topographic diversity. To increase the quantity of available fall Chinook salmon spawning habitat in the Ice Harbor and Lower Granite study area, modifications to hydroelectric dam operations beyond those evaluated in this study likely would be necessary. M

Hanrahan, Timothy P.; Richmond, Marshall C.; Arntzen, Evan V. [Pacific Northwest National Laboratory

2007-11-13T23:59:59.000Z

447

Oak Ridge Office Document Management Ststem(HummingbirdDM) PIA...  

Energy Savers [EERE]

Document Management Ststem(HummingbirdDM) PIA, Oak Ridge Operations Office Oak Ridge Office Document Management Ststem(HummingbirdDM) PIA, Oak Ridge Operations Office Oak Ridge...

448

Small-scale hydroelectric power demonstration project: Broad River Electric Cooperative, Inc. , Cherokee Falls, South Carolina: Final operations and maintenance report  

SciTech Connect (OSTI)

The purpose of this report is to give a final accounting of the costs and benefits derived from the first two years of operation of the Cherokee Falls, Broad River Hydroelectric Demonstration Project which was built at Cherokee Falls, South Carolina. Prior to construction, Broad River Electric Cooperative, Inc. (BREC) executed a Cooperative Agreement with the US Department of Energy (DOE) Number FC07-80ID12125 which provided $1,052,664 toward the construction of the facility. This agreement requires that BREC document for DOE a summary of the complete operating statistics, operating and maintenance cost, and revenues from power sales for a two-year operating period. A complete reporting covering the design, technical, construction, legal, institutional, environmental and other related aspects of the total project was furnished to DOE previously for publication as the ''Final Technical and Construction Cost Report''. For this reason these elements will not be addressed in detail in this report. In order to make this account a more meaningful discussion of the initial two-year and four month production period, it is necessary to detail several unique events concerning the project which set Cherokee Falls apart from other projects developed under similar Cooperative Agreements with DOE. Accordingly, this report will discuss certain major problems experienced with the design, operation and maintenance, energy production, as well as the operation and maintenance cost and value of the power produced for the first 28 months of operation. 3 figs.

Not Available

1988-08-01T23:59:59.000Z

449

Office of River Protection, plan for Developing Hanford Tank Waste Processing Alternatives, Revision 1, December 15, 1999  

SciTech Connect (OSTI)

In August 2000, The Department of Energy (DOE) must decide whether to authorize BNFL Inc. (BNFL) to construct and operate tank waste processing facilities as proposed or to take another path. This will be a multi-billion dollar commitment, requiring that the best path forward be chosen. The plan for reaching this decision is described in reference 1. The alternative evaluations in this plan are directed toward acquiring information needed for the August 2000 decision and for preparing an alternate path plan, should an acceptable agreement with BNFL not be reached. Many of the alternatives considered may still be applicable for failures that could occur after the year 2000, however, depending on the cause of later failures, others alternatives may need to be developed.

WODRICH, D.D.

2000-01-03T23:59:59.000Z

450

United States Army; Fort Gordon, Georgia, Range Control Operations  

Broader source: Energy.gov (indexed) [DOE]

DRAFT DRAFT Joint Standard Operating Procedures (JSOP) For Military Training at the Savannah River Site August 2011 U.S. Department of Energy, Savannah River Operations Office, Savannah River Site And U.S. Department Of The Army, Fort Gordon, Georgia DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. 2 Chapter 1 General, 1.1 Purpose, page 8 1.2 Scope, page 8 1.3 Explanation of abbreviation and terms, page 8 1.4 Applicability, page 8 1.5 Deviations and Amendments, page 8 Chapter 2 Responsibilities 2.1 DOE-Savannah River Point of Contact (DOE-SR POC), page 10 2.2 DOE-Assistant Manager for Integration and Planning (AMIP), page 10 2.3 SRNS Interface Management Office, page 10 2.4 Directorate of Plans, Training, Mobilization, and Security (DPTMS), Page 10

451

Idaho Operations Office  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

A A p r i l 12, 2007 SUBJECT: Final Environmental Assessment for the National Security Test Range and Finding of No Significant Impact (TD&D-NS-07-013) Dear Interested Party: The U.S. Department of Energy (DOE) has completed the Final Environmental Assessment (EA) for the National Security Test Range at the Idaho National Laboratory and determined that a Finding of No Significant Impact (FONSI) was appropriate. The draft EA was made available for 37-day public review and comment period on December 6,2006. DOE considered all comments made on the draft EA when developing the final EA and selecting the alternative that best meets the purpose and need. A Response to Comments section has been provided as Appendix C of the Final EA. If you have any questions regarding the final EA or FONSI, please contact Don Michaelson at

452

Idaho Operations Office  

Broader source: Energy.gov (indexed) [DOE]

March 8, 2011 March 8, 2011 SUBJECT: Final Environmental Assessment for the Idaho National Laboratory Stand-Off Experiment Range and Finding of No Significant Impact Dear Interested Party: The U.S. Department of Energy (DOE) has completed the Final Environmental Assessment (EA) for the Idaho National Laboratory Stand-Off Experiment (SOX) Range and determined that a Finding of No Significant Impact (FONSI) is appropriate. The draft EA was made available for 38-day public review and comment period on December 22,2010. DOE considered all comments made on the draft EA when developing the final EA and in making its determination. A Public Comment and Response section has been included as Appendix B of the final EA. The FONSI and final EA can be accessed on the DOE website at www.id.doe.gov. Thank you

453

Richland Operations Office  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

as needed. Work cooperatively with private landowners to develop elk hunting season strategies that will control elk populations and reduce or eliminate damage problems. 2....

454

Richland Operations Office  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AT-45-1I-GEN 21 between the Atomic Energy Commission and the Northern Pacific Railway Company dated December 7, 1948. We have conducted a thorough search and were unable to...

455

Richland Operations Office  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

co ued c m nain 9)73 11iic 6--3lh anlbhrd Site, inadvertentv failed to include EUI 973 as a prop.osed FE-Ol1 deletion in tihe original renewval application. This...

456

Rich land Operations Office  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

-350(3)(e) - A list of all emergency X X X equipment at the facility (such as fire Hanford Fire Section 9.0 Section 7.4 extinguishing systems, spill control Department:...

457

Richland Operations Office  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

direction of the BED. The Incident 15 Command Post (ICP) is managed by either the senior Hanford Fire Department member present or senior 16 Hanford Patrol member present on the...

458

Idaho Operations Office  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

';b "* orl'W'f l - '75 ' Z' ' "Wi'ttrto% NEPA Document Title, Location, Document Number No MAPs anticipated Annual NEPA Planning Summary Mitigation Action Plan...

459

Richland Operations Office  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the defect was repaired. The subsequent driver would review the DVIR and inspect the repair. If the driver agrees that defect was repaired, the driver also signs the DVIR as...

460

Savannah River Site Waste Disposition Project  

Broader source: Energy.gov (indexed) [DOE]

Terrel J. Spears Terrel J. Spears Assistant Manager Waste Disposition Project DOE Savannah River Operations Office Savannah River Site Savannah River Site Waste Disposition Project Waste Disposition Project 2 Waste Disposition Project - Mission Radioactive Liquid Waste - Tank Waste Stabilization and Disposition - Disposition 36 million gallons of radioactive liquid waste - Close 49 underground storage tanks in which the waste now resides 3 36.7 Million 33.7 Mgal (92%) 3.0 Mgal (8%) Saltcake Sludge Salt Supernate Volume Curies 397 Million Curies (MCi) 212 MCi (54%) 185 MCi (46%) Gallons (Mgal) 36.5 Million 33.5 Mgal (92%) 3.0 Mgal (8%) Liquid Waste Background Liquid Waste Background * 2 tanks closed * 49 tanks remaining to close - aging, carbon steel - 27 compliant, 22 non-compliant - 12 have known leak sites

Note: This page contains sample records for the topic "river operations office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Columbia River Treaty  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

an understanding of the implications for post-2024 Treaty planning and Columbia River operations. The joint effort by the Entities to conduct initial post-2024 modeling and...

462

Office of Congressional and Intergovernmental Affairs  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

OFFICE OF RIVER PROTECTION NUCLEAR WASTE PROGRAM RICHLAND, WA 99352 RICHLAND, WA 99354 NEWS MEDIA CONTACTS: FOR IMMEDIATE RELEASE: Lori Gamache, ORP, (509) 372-9130 December 12,...

463

DOE/EA-1528: Environmental Assessment for the Storage of Tritium-Producing Burnable Absorber RODs in K-Area Transfer Bay at the Savannah River Site (6/2/05)  

Broader source: Energy.gov (indexed) [DOE]

28 28 JUNE 2005 U. S. DEPARTMENT OF ENERGY SAVANNAH RIVER OPERATIONS OFFICE SAVANNAH RIVER SITE ENVIRONMENTAL ASSESSMENT FOR THE STORAGE OF TRITIUM-PRODUCING BURNABLE ABSORBER RODS IN K-AREA TRANSFER BAY AT THE SAVANNAH RIVER SITE DOE/EA-1528 ENVIRONMENTAL ASSESSMENT FOR THE STORAGE OF TRITIUM-PRODUCING BURNABLE ABSORBER RODS IN K-AREA TRANSFER BAY AT THE SAVANNAH RIVER SITE June 2005 U. S. DEPARTMENT OF ENERGY SAVANNAH RIVER OPERATIONS OFFICE SAVANNAH RIVER SITE This page is intentionally left blank ii TABLE OF CONTENTS Page 1.0 INTRODUCTION 1 1.1 Background 1 1.2 Purpose and Need for Action 2 2.0 PROPOSED ACTION AND ALTERNATIVES 2 2.1 Proposed Action 2 2.2 Alternatives to the Proposed Action 3

464

Docket No. EO-05-01: Letter from Kevin Kolevar, Director Office of  

Broader source: Energy.gov (indexed) [DOE]

from Kevin Kolevar, Director Office of from Kevin Kolevar, Director Office of Electricity Delivery and Energy Reliability, to Mr. Robert Driscoll, CEO Mirant Mid-Atlantic, LLC Docket No. EO-05-01: Letter from Kevin Kolevar, Director Office of Electricity Delivery and Energy Reliability, to Mr. Robert Driscoll, CEO Mirant Mid-Atlantic, LLC Docket No. EO-05-01: On December 20, 2005, the Secretary of Energy issued DOE Order No. 202-05-3, pursuant to section 202(c) of the Federal Power Act, 16 U.S.c. § 824a(c), ordering the operation of the Potomac River Generating Station (the Plant) owned by Mirant Potomac River, LLC (Mirant). DOE has determined that the operation of the Plant under Option A pursuant to DOE's January 4, 2006 instructions does not provide an adequate level of electric reliability to the Central D.C. area under current circumstances. Operation

465

Kurt Buhlmann | Savannah River Ecology Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Buhlmann Curriculum Vitae Faculty & Scientists SREL Home SREL Herpetology Kurt A. Buhlmann Savannah River Ecology Laboratory P O Drawer E, Aiken, SC 29802 (803) 725-5293 office...

466

Justin D. Congdon | Savannah River Ecology Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Congdon Curriculum Vitae Faculty & Scientists SREL Home SREL Herpetology Justin D. Congdon Savannah River Ecology Laboratory P O Drawer E, Aiken, SC 29802 (803) 725-5341 office...

467

Columbia River System Operation Review : Final Environmental Impact Statement, Appendix F: Irrigation, Municipal and Industrial/Water Supply.  

SciTech Connect (OSTI)

Since the 1930`s, the Columbia River has been harnessed for the benefit of the Northwest and the nation. Federal agencies have built 30 major dams on the river and its tributaries. Dozens of non-Federal projects have been developed as well. The dams provide flood control, irrigation, navigation, hydro-electric power generation, recreation, fish and wildlife, and streamflows for wildlife, anadromous fish, resident fish, and water quality. This is Appendix F of the Environmental Impact Statement for the Columbia River System, focusing on irrigation issues and concerns arrising from the Irrigation and Mitigation of impacts (M&I) working Group of the SOR process. Major subheadings include the following: Scope and process of irrigation/M&I studies; Irrigation/M&I in the Columbia Basin Today including overview, irrigated acreage and water rights, Irrigation and M&I issues basin-wide and at specific locations; and the analysis of impacts and alternative for the Environmental Impact Statement.

Columbia River System Operations Review (U.S.); United States. Bonneville Power Administration; United States. Army. Corps of Engineers. North Pacific Division; United States. Bureau of Reclamation. Pacific Northwest Region.

1995-11-01T23:59:59.000Z

468

Arrangement between the Office for Nuclear Regulation of Great Britain and the United States Department of Energy for the Exchange of Information and Co-operation in the Area of Nuclear Safety Matters  

Broader source: Energy.gov [DOE]

Arrangement between the Office for Nuclear Regulation of Great Britain and the United States Department of Energy for the Exchange of Information and Co-operation in the Area of Nuclear Safety Matters.

469

U.S. Department of Energy, Oak Ridge Operations Office Nuclear Facility Safety Basis Fundamentals Self-Study Guide [Fulfills ORO Safety Basis Competency 1, 2 (Part 1), or 7 (Part 1)  

Broader source: Energy.gov [DOE]

"This self-study guide provides an overview of safety basis terminology, requirements, and activities that are applicable to DOE and Oak Ridge Operations Office (ORO) nuclear facilities on the Oak...

470

Office of Information Resources  

Broader source: Energy.gov (indexed) [DOE]

US Department of Energy US Department of Energy FOIA/PA Contact List Operations Offices Chicago Office Privacy Act Officer FOIA Officer Miriam Legan Miriam Legan U.S. Department of Energy Chicago Office 9800 S. Cass Avenue Argonne, IL 60439 miriam.legan@ch.doe.gov Phone: 630-252-2041 Fax: 630-252-2183 U.S. Department of Energy Chicago Office 9800 S. Cass Avenue Argonne, IL 60439 miriam.legan@ch.doe.gov Phone: 630-252-2041 Fax: 630-252-2183 Idaho Operations Office Clayton Ogilvie Clayton Ogilvie U.S. Department of Energy 1955 Fremont Ave. MS 1203 Idaho Falls, Idaho 83401 Phone: (208) 526-5190 Fax: 208-526-8789 U.S. Department of Energy 1955 Fremont Ave. MS 1203 Idaho Falls, Idaho 83401 Phone: (208) 526-5190 Fax: 208-526-8789 Oak Ridge Office Amy Rothrock Amy Rothrock

471

Office of Information Resources  

Broader source: Energy.gov (indexed) [DOE]

Freedom of Information and Privacy Act Database Freedom of Information and Privacy Act Database Bureau: DOE-ID Project Unique ID: Date: May 8,2008 A. CONTACT INFORMATION 1. Who is the person completing this document? Nicole Brooks Title: FOIA/PA Officer Organization: DOE-ID Public Affairs Office Address: 1955 N. Fremont Ave, MS 1203 Idaho Falls, Idaho 83415 2. Who is the system owner? Nicole Brooks, FOIA/PA Officer U.S. DOE, Idaho Operations Office DOE-ID Public Affairs Office Address: 1955 N. Fremont Ave, MS 1203 Idaho Falls, Idaho 834 15 3. Who is the system manager for this system o r application? Nicole Brooks, FOIA/PA Officer U.S. DOE, Idaho Operations Office DOE-ID Public Affairs Office Address: 1955 N. Fremont Ave, MS 1203 Idaho Falls, Idaho 83415 4. Who is the IT Security Manager who reviewed this document?

472

Office of Information Resources  

Broader source: Energy.gov (indexed) [DOE]

Office of Personnel Management (OPM) Billing System Office of Personnel Management (OPM) Billing System Bureau: Department of Energy Project Unique ID: 01 9-1 0-01 -22-02-3048-00 Date: 02/08/2008 A. CONTACT INFORMATION 1) Who is the person completing this document? Joanne Csordas (HS-1.21), Office of Business Operations, Office of Resource Management, Office of Health, Safety and Security, U.S. Department of Energy, HS-1.21, 1000 Independence Avenue, SW, Washington D.C. 20585, (301) 903-3573 2) Who is the system owner? Joanne Csordas (HS-1.2 l), Office of Business Operations, Office of Resource Management, Office of Health, Safety and Security, U.S. Department of Energy, HS- 1.2 1, 1000 Independence Avenue, SW, Washington D.C. 20585, (301) 903-3573 3) Who is the system manager for this system or application?

473

Property:ManagingFieldOffice | Open Energy Information  

Open Energy Info (EERE)

ManagingFieldOffice ManagingFieldOffice Jump to: navigation, search Property Name ManagingFieldOffice Property Type Page Pages using the property "ManagingFieldOffice" Showing 25 pages using this property. (previous 25) (next 25) B BLM-NV-WN-ES-08-01-1310, NV-020-08-01 + BLM Humboldt River Field Office + C CA-017-05-051 + BLM Bishop Field Office + CA-170-02-15 + BLM Bishop Field Office + D DOE-EA-1116 + DOE Golden Field Office + DOE-EA-1621 + DOE Golden Field Office + DOE-EA-1733 + DOE Golden Field Office + DOE-EA-1759 + DOE Golden Field Office + DOE-EA-1849 + DOE Golden Field Office + DOI-BLM-CA-C050-2009-0005-EA + BLM Ukiah Field Office + DOI-BLM-CA-ES-2013-002+1793-EIS + BLM Bishop Field Office + DOI-BLM-ID-110-2009-3825-CE + BLM Four Rivers Field Office +

474

Mixed waste disposal facilities at the Savannah River Site  

SciTech Connect (OSTI)

The Savannah River Site (SRS) is a key installation of the US Department of Energy (DOE). The site is managed by DOE's Savannah River Field Office and operated under contract by the Westinghouse Savannah River Company (WSRC). The Site's waste management policies reflect a continuing commitment to the environment. Waste minimization, recycling, use of effective pre-disposal treatments, and repository monitoring are high priorities at the site. One primary objective is to safely treat and dispose of process wastes from operations at the site. To meet this objective, several new projects are currently being developed, including the M-Area Waste Disposal Project (Y-Area) which will treat and dispose of mixed liquid wastes, and the Hazardous Waste/Mixed Waste Disposal Facility (HW/MWDF), which will store, treat, and dispose of solid mixed and hazardous wastes. This document provides a description of this facility and its mission.

Wells, M.N.; Bailey, L.L.

1991-01-01T23:59:59.000Z

475

Mixed waste disposal facilities at the Savannah River Site  

SciTech Connect (OSTI)

The Savannah River Site (SRS) is a key installation of the US Department of Energy (DOE). The site is managed by DOE`s Savannah River Field Office and operated under contract by the Westinghouse Savannah River Company (WSRC). The Site`s waste management policies reflect a continuing commitment to the environment. Waste minimization, recycling, use of effective pre-disposal treatments, and repository monitoring are high priorities at the site. One primary objective is to safely treat and dispose of process wastes from operations at the site. To meet this objective, several new projects are currently being developed, including the M-Area Waste Disposal Project (Y-Area) which will treat and dispose of mixed liquid wastes, and the Hazardous Waste/Mixed Waste Disposal Facility (HW/MWDF), which will store, treat, and dispose of solid mixed and hazardous wastes. This document provides a description of this facility and its mission.

Wells, M.N.; Bailey, L.L.

1991-12-31T23:59:59.000Z

476

Columbia River System Operation Review : Final Environmental Impact Statement, Appendix C: Anadromous Fish and Juvenile Fish Transportation.  

SciTech Connect (OSTI)

This Appendix C of the Final Environmental Impact Statement for the Columbia River System discusses impacts on andromous fish and juvenile fish transportation. The principal andromous fish in the Columbia basin include salmonid species (Chinook, coho, and sockeye salmon, and steelhead) and nonsalmoinid andromous species (sturgeon, lamprey, and shad). Major sections in this document include the following: background, scope and process; affected environment for salmon and steelhead, shaded, lamprey, sturgeon; study methods; description of alternatives: qualitative and quantitative findings.

Columbia River System Operation Review (U.S.)

1995-11-01T23:59:59.000Z

477

Business Operations Contacts  

Office of Energy Efficiency and Renewable Energy (EERE)

If you have a question for the Office of Business Operations, you can use this contact information to reach the office you're interested in:

478

Purchase of Computers for the U.S. Department of Agriculture Forest Service at the Savannah River Site, OAS-M-12-03  

Broader source: Energy.gov (indexed) [DOE]

Audits and Inspections Audits and Inspections Management Alert Purchase of Computers for the U.S. Department of Agriculture Forest Service at the Savannah River Site OAS-M-12-03 March 2012 Department of Energy Washington, DC 20585 March 23, 2012 MEMORANDUM FOR THE MANAGER, SAVANNAH RIVER OPERATIONS OFFICE FROM: Rickey R. Hass Deputy Inspector General for Audits and Inspections Office of Inspector General SUBJECT: INFORMATION: Management Alert on "Purchase of Computers for the U.S. Department of Agriculture Forest Service at the Savannah River Site" IMMEDIATE CONCERN In October 2011, the Office of Inspector General received a complaint that the U.S. Department of Agriculture Forest Service - Savannah River (Forest Service) had purchased a number of

479

ORO Office Safeguards and Security Clearance Tracking System...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Office Safeguards and Security Clearance Tracking System and Visitor Control System PIA, Oak Ridge Operations Office ORO Office Safeguards and Security Clearance Tracking System...

480

Remedial investigation/feasibility study of the Clinch River/Poplar Creek Operable Unit. Volume 5. Appendixes J, K, L, M, and N-other supporting information  

SciTech Connect (OSTI)

This report presents the findings of an investigation into contamination of the Clinch River and Poplar Creek near the U.S. Department of Energy`s (DOE`s) Oak Ridge Reservation (ORR) in eastern Tennessee. For more than 50 years, various hazardous and radioactive substances have been released to the environment as a result of operations and waste management activities at the ORR. In 1989, the ORR was placed on the National Priorities List (NPL), established and maintained under the federal Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under CERCLA, NPL sites must be investigated to determine the nature and extent of contamination at the site, assess the risk to human health and the environment posed by the site, and, if necessary, identify feasible remedial alternatives that could be used to clean the site and reduce risk. To facilitate the overall environmental restoration effort at the ORR, CERCLA activities are being implemented individually as distinct operable units (OUs). This document is Volume 5 of the combined Remedial Investigation and Feasibility Study Report for the Clinch River