Powered by Deep Web Technologies
Note: This page contains sample records for the topic "river experi mental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Raft River Geothermal Aquaculture Experiment. Phase II  

DOE Green Energy (OSTI)

Channel catfish, tilapia and Malaysian prawns were cultured directly in geothermal water for approximately seven months at the Department of Energy, Raft River Geothermal Site, to evaluate the organisms throughout a grow-out cycle. Parameters evaluated included survival, growth, bioaccumulation of metals and fluoride, collagen synthesis, and bone calcium levels. Growth at Raft River was slightly lower than at a companion commercial facility at Buhl, Idaho, but was attributed to facility differences rather than an adverse impact of geothermal water. No significant differences were recorded between Raft River and Buhl fish for bone calcium or collagen concentrations. No significant accumulation of heavy metals by fish or prawns was recorded.

Campbell, D.K.; Rose, F.L.; Kent, J.C.; Watson, L.R.; Sullivan, J.F.

1979-08-01T23:59:59.000Z

2

Nuclear fuels accounting interface: River Bend experience  

SciTech Connect

This presentation describes nuclear fuel accounting activities from the perspective of nuclear fuels management and its interfaces. Generally, Nuclear Fuels-River Bend Nuclear Group (RBNG) is involved on a day-by-day basis with nuclear fuel materials accounting in carrying out is procurement, contract administration, processing, and inventory management duties, including those associated with its special nuclear materials (SNM)-isotopics accountability oversight responsibilities as the Central Accountability Office for the River Bend Station. As much as possible, these duties are carried out in an integrated, interdependent manner. From these primary functions devolve Nuclear Fuels interfacing activities with fuel cost and tax accounting. Noting that nuclear fuel tax accounting support is of both an esoteric and intermittent nature, Nuclear Fuels-RBNG support of developments and applications associated with nuclear fuel cost accounting is stressed in this presentation.

Barry, J.E.

1986-01-01T23:59:59.000Z

3

Raft River well stimulation experiments: geothermal reservoir well stimulation program  

DOE Green Energy (OSTI)

The Geothermal Reservoir Well Stimulation Program (GRWSP) performed two field experiments at the Raft River KGRA in 1979. Wells RRGP-4 and RRGP-5 were selected for the hydraulic fracture stimulation treatments. The well selection process, fracture treatment design, field execution, stimulation results, and pre- and post-job evaluations are presented.

Not Available

1980-08-01T23:59:59.000Z

4

Adverse experiences with nitric acid at the Savannah River Site  

SciTech Connect

Nitric acid is used routinely at the Savannah River Site (SRS) in many processes. However, the site has experienced a number of adverse situations in handling nitric acid. These have ranged from minor injuries to personnel to significant explosions. This document compiles many of these events and includes discussions of process upsets, fires, injuries, and toxic effects of nitric acid and its decomposition products. The purpose of the publication is to apprise those using the acid that it is a potentially dangerous material and can react in many ways as demonstrated by SRS experience. 10 refs.

Durant, W.S.; Craig, D.K.; Vitacco, M.J.; McCormick, J.A.

1991-06-01T23:59:59.000Z

5

THE IPOS FRAMEWORK: LINKING FISH SWIMMING PERFORMANCE IN ALTERED FLOWS FROM LABORATORY EXPERIMENTS TO RIVERS  

Science Conference Proceedings (OSTI)

Current understanding of the effects of turbulence on the swimming performance of fish 32 is primarily derived from laboratory experiments under pressurized flow swim tunnels 33 and open channel flow facilities. These studies have produced valuable information on 34 the swimming mechanics and behavior of fish in turbulent flow. However, laboratory 35 studies have limited representation of the flows fish experience in nature. The complex 36 flow structure in rivers is imparted primarily by the highly heterogeneous and non37 uniform bed and planform geometry. Our goal is to direct future laboratory and field 38 studies to adopt a common framework that will shape the integration of both approaches. 39 This paper outlines four characteristics of turbulent flow, which we suggest should be 40 evaluated when generalizing results from fish turbulent studies in both the laboratory and 41 the field. The framework is based on four turbulence characteristics that are summarized 42 under the acronym IPOS: Intensity, Periodicity, Orientation, and Scale.

Neary, Vincent S [ORNL

2011-01-01T23:59:59.000Z

6

Asbestos--cement pipeline experience at the Raft River Geothermal Project  

DOE Green Energy (OSTI)

The first buried asbestos-cement (Transite) pipeline used in high temperature (approximately 300/sup 0/F) service for transport of geothermal fluids was installed in the fall of 1975, and has seen 1/sup 1///sub 2/ years of service. The line is 4000 ft long, between the deep geothermal wells No. 1 and No. 2, in the Raft River Valley of Idaho. The experience in using this pipeline has been satisfactory, and methods have been developed for minimizing the thermal expansion/thermal shock breakage problems. Recommendations on improved design and construction practices for future pipelines are given. The substantially reduced cost (factor of 2) of an asbestos-cement pipeline compared to the conventional steel pipeline, plus the esthetically desirable effect of a buried pipeline dictate adoption of this type as standard practice for moderate temperature geothermal developments. The Raft River Geothermal Project intends to connect all future wells with pipelines of asbestos-cement, insulated with 1 to 2-inches of urethane, and buried between 2 and 3 ft. Total cost will be approximately $110,000/mile for 10-inch diameter pipe, $125,000/mile for 12-inch diameter.

Miller, L.G.; Kunze, J.F.; Sanders, R.D.

1977-04-01T23:59:59.000Z

7

Savannah River Site Experiences in In Situ Field Measurements of Radioactive Materials  

Science Conference Proceedings (OSTI)

This paper discusses some of the field gamma-ray measurements made at the Savannah River Site, the equipment used for the measurements, and lessons learned during in situ identification and characterization of radioactive materials.

Moore, F.S.

1999-10-07T23:59:59.000Z

8

Impacts of the Snake River drawdown experiment on fisheries resources in Little Goose and Lower Granite Reservoirs, 1992  

DOE Green Energy (OSTI)

In March 1992, the US Army Corps of Engineers initiated a test to help evaluate physical and environmental impacts resulting from the proposed future drawdown of Snake River reservoirs. Drawdown would reduce water levels in Snake River reservoirs and is being proposed as a solution to decrease the time it takes for salmon and steelhead smolts to migrate to the ocean. The Pacific Northwest Laboratory evaluated impacts to specific fisheries resources during the drawdown experiment by surveying Lower Granite Reservoir to determine if fall chinook salmon (Oncorhynchus tshawytscha) spawning areas and steelhead (0. mykiss) access to tributary creeks were affected. In addition, shoreline areas of Little Goose Reservoir were monitored to evaluate the suitability of these areas for spawning by fall chinook salmon. Relative abundance of fish species in nearshore areas was also determined during the drawdown, and stranded resident fish and other aquatic organisms were observed.

Dauble, D D; Geist, D R

1992-09-01T23:59:59.000Z

9

Injection in basin and range-type reservoirs: the Raft River experience  

DOE Green Energy (OSTI)

Injection testing at the Raft River KGRA has yielded some interesting results which can be useful in planning injection systems in Basin and Range type reservoirs. Because of inhomogeneities and possible fracturing in basin fill sediment, rapid pressure response to injection has been observed in one shallow monitor well, but not others. In some monitor wells in the injection field, pressure drops are observed during injection suggesting plastic deformation of the sediments. Seismicity, however, has not accompanied these observed water level changes.

Petty, S.; Spencer, S.

1981-01-01T23:59:59.000Z

10

Material management: experience on the Alaska North Slope Project. [Kuparuk River Project  

SciTech Connect

The Kuparuk River Unit Project started in 1978, with the first major production facility sea lifted to the construction site on the North Slope of Alaska in the summer of 1981. The oil production field is located approximately 25 miles west of the Prudhoe Bay facility and 250 miles north of the Arctic Circle. The size of the Kuparuk site is 215 square miles, overlaying a projected recoverable reservoir of 1.2 billion barrels of oil. The present plan calls for approximately 50 drillsite pads, with the possibility of up to 32 wells on each pad. Modular construction was the most cost-effective method to use. The need for intensive material management on the Kuparuk River Unit Project became evident as the scope of engineering effort increased, shortening the amount of time available for acquisition of purchased materials and for the construction of the modules to meet the annual six-week sea-lift delivery period. The logistics of the Kuparuk construction site, the timeframe required to do the modular construction, the support facilities necessary, and several contractors and types of contracts, required Stearns Catalytic Corporation to consider a sophisticated material control system to identify the various areas of concern. The computerized system set up to solve the problems is discussed here generically.

Humphreys, R.B.

1985-08-01T23:59:59.000Z

11

Beneficial uses of geothermal energy description and preliminary results for phase 1 of the Raft River irrigation experiment  

DOE Green Energy (OSTI)

The first phase of an experiment using geothermal water for irrigation is described and preliminary results are discussed. The water was from a moderate temperature well, having salinity of about 2000 ppM, and is considered characteristic of the types of geothermal fluids that will be obtained from the young volcanic/young sediment formations of the northern intermountain west. The activity was completed at a location adjacent to ERDA's Raft River Geothermal Project in southern Idaho. About 12.5 acres, of which part had no previous cultivation, were subdivided by crops and irrigation practices for investigation with the geothermal water and a control comparison water from the relatively pure Raft River. Flood and sprinkler application techniques were used and wheat, barley, oats, grasses, alfalfa, potatoes, and garden vegetables were successfully grown. An accompanying experiment evaluated the behavior of an established alfalfa crop located nearby, when most of the irrigation water was geothermal. The experiment addressed heavy metal uptake in plants, plant fluoride retention and damage, plant tolerances to salts, soil alterations and other behavior as a result of the geothermal fluids, all of which were largely believed to eliminate geothermal water from contention for crop growing utilization. Not all analyses and results are complete in this reporting, but first results indicate no apparent difference between the geothermal watered crops and those obtained using the fresh water control. Extensive chemical analyses, neutron activation analyses, and other evaluations of crop samples are discussed, and some of the findings are presented. Although evaluation of crop yields was not an objective, extrapolations from samples indicate that yield results were comparable to those commonly found in the area, and the yield varied little between water sources. (JGB)

Schmitt, R.C.; Spencer, S.G.

1977-01-01T23:59:59.000Z

12

Fluidized-bed potato waste drying experiments at the Raft River Geothermal Test Site  

SciTech Connect

A fluidized-bed dryer was built and operated at the Raft River Geothermal Test Site in south central Idaho to test the feasibility of using low-temperature (145/sup 0/C or lower) geothermal fluids as an energy source for drying operations. The dryer performed successfully on two potato industry waste products that had a solid content of 5 to 13%. The dried product was removed as a sand-like granular material or as fines with a flour-like texture. Test results, observations, and design recommendations are presented. Also presented is an economic evaluation for commercial-scale drying plants using either geothermal low-temperature water or oil as a heat source.

Cole, L.T.; Schmitt, R.C.

1980-06-01T23:59:59.000Z

13

On developmental mental architectures  

Science Conference Proceedings (OSTI)

This paper presents a computational theory of developmental mental architectures for artificial and natural systems, motivated by neuroscience. The work is an attempt to approximately model biological mental architectures using mathematical tools. Six ... Keywords: Agent architecture, Autonomous mental development, Autonomous planning, Cognitive development, Computational neural science, Developmental robots, Developmental vision, Language acquisition, Learning types, Mental architecture, Reasoning, Speech recognition, Thinking

Juyang Weng

2007-08-01T23:59:59.000Z

14

River Thames River Thames  

E-Print Network (OSTI)

C BD A River Thames River Thames Waterloo & City Southwark Northwood Northwood Hills North Harrow Oaks South Croydon East Croydon Streatham Common West Norwood Gipsy Hill Crystal Palace Birkbeck Penge

Delmotte, Nausicaa

15

Technology in mental health  

Science Conference Proceedings (OSTI)

Mental illness has been identified as one of the greatest challenges facing society in the coming decades. However, there are significant barriers to access for many people suffering from mental illness, including overburdened public health care systems, ... Keywords: cognitive rehabilitation, computer based treatment, engagement, ethics, exposure therapy, mental health, psychotherapy, stigma, universal design, user centered design

Gavin Doherty; John Sharry; Magnus Bang; Mariano Alcaiz; Rosa Baos

2008-04-01T23:59:59.000Z

16

Hydrological Cycle over South and Southeast Asian River Basins as Simulated by PCMDI/CMIP3 Experiments  

E-Print Network (OSTI)

We investigate how CMIP3 climate models describe the hydrological cycle over four major South Asian river basins (Indus, Ganges, Brahmaputra and Mekong) for the XX, XXI, and XXII centuries. For the XX century, models simulated water balance and total runoff quantities are neither consistent with the observed mean river discharges nor among the models. Most of the models underestimate the water balance for the Ganges, Brahmaputra and Mekong basin and overestimate it for the Indus basin. The only modest inter-model agreement is found for the Indus basin in terms of precipitation, evaporation and the strength of the hydrological cycle and for the Brahmaputra basin in terms of evaporation. While some models show inconsistencies for the Indus and the Ganges basins, most of the models seem to conserve water at the river basin scale up to a good degree of approximation. Models agree on a negative change of the water balance for Indus and a positive change in the strength of the hydrological cycle, whereas for Brahma...

Hasson, Shabeh ul; Pascale, Salvatore

2013-01-01T23:59:59.000Z

17

Why Analyze Mental Models of Local Climate Change? A Case from Southern Mozambique  

Science Conference Proceedings (OSTI)

People construct mental models of local climate change based on their observations and experiences of past climate events and changes. These mental models offer critical insight into locally important factors that trigger responses to new climate ...

L. Jen Shaffer; Leocadia Naiene

2011-10-01T23:59:59.000Z

18

Mental retardation, hereditary?  

NLE Websites -- All DOE Office Websites (Extended Search)

Mental retardation, hereditary? Mental retardation, hereditary? Name: Karthikk Status: N/A Age: N/A Location: N/A Country: N/A Date: N/A Question: If a mentally retarded couple had a child, would it be mentally retarded? Replies: Karthikk, Just a short answer. The likelihood you ask about would vary according to what type of mental retardation is present in each of the parents. Some (probably most) forms of mental retardation are genetic in nature and therefore would be inheritable. There are of course cases where non-mentally retarded parents produce a child which is mentally retarded. These cases occur through errors in either production of the sex cells, possibly due to exposure to radiation, for example, or in errors in cell division leading up to and through conception. A good deal of research is currently underway mapping the human chromosomes. I would suspect in the not-so-distant future, an exact answer could be given to your question by looking at the chromosomes of the parents and producing at least a statistical prediction of heritable mental retardation.

19

EXPERIENCE MONITORING FOR LOW LEVEL NEUTRON RADIATION AT THE H-CANYON AT THE SAVANNAH RIVER SITE  

Science Conference Proceedings (OSTI)

Department of Energy contractors are required to monitor external occupational radiation exposure of an individual likely to receive an effective dose equivalent to the whole body of 0.1 rem (0.001sievert) or more in a year. For a working year of 2000 hours, this translates to a dose rate of 0.05 mrem/hr (0.5 {micro}Sv/hr). This can be a challenging requirement for neutron exposure because traditional surveys with shielded BF{sub 3} proportional counters are difficult to conduct, particularly at low dose rates. A modified survey method was used at the Savannah River Site to find low dose rates in excess of 0.05 mrem/hr. An unshielded He{sup 3} detector was used to find elevated gross slow neutron counts. Areas with high count rates on the unshielded He{sup 3} detector were further investigated with shielded BF{sub 3} proportional counters and thermoluminescent neutron dosimeters were placed in the area of interest. An office area was investigated with this method. The data initially suggested that whole body neutron dose rates to office workers could be occurring at levels significantly higher than 0.1 rem (0.001sievert). The final evaluation, however, showed that the office workers were exposed to less than 0.1 rem/yr (0.001sievert/yr) of neutron radiation.

HOGUE, MARK

2005-10-07T23:59:59.000Z

20

Studying team shared mental models  

Science Conference Proceedings (OSTI)

As technology is used to support team-based activities, one important factor affecting the performance of teams is the kind of mental model shared between team members. This paper describes a novel conceptual graph based methodology to study these mental ... Keywords: conceptual graphs, mental models, shared mental models, taskwork, team communication, team effectiveness, team performance, teamwork

Sandra Carpenter; Julie L. Fortune; Harry S. Delugach; Letha H. Etzkorn; Dawn R. Utley; Phillip A. Farrington; Shamsnaz Virani

2008-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "river experi mental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Organizational Readiness in Specialty Mental Health Care  

E-Print Network (OSTI)

the organizational social context (OSC) of mental healthOrganizational Readiness in Specialty Mental Health Careorganizational assessment in specialty mental health, in

Hamilton, Alison B.; Cohen, Amy N.; Young, Alexander S.

2010-01-01T23:59:59.000Z

22

Experiences  

NLE Websites -- All DOE Office Websites (Extended Search)

Experiences Experiences with 100Gbps Network Applications Mehmet Balman, Eric Pouyoul, Yushu Yao, E. Wes Bethel Burlen Loring, Prabhat, John Shalf, Alex Sim, and Brian L. Tierney Lawrence Berkeley National Laboratory One Cyclotron Road Berkeley, CA, 94720, USA {mbalman,epouyoul,yyao,ewbethel,bloring,prabhat,jshalf,asim,btierney}@lbl.gov ABSTRACT 100Gbps networking has finally arrived, and many research and educational institutions have begun to deploy 100Gbps routers and services. ESnet and Internet2 worked together to make 100Gbps networks available to researchers at the Supercomputing 2011 con- ference in Seattle Washington. In this paper, we describe two of the first applications to take advantage of this network. We demon- strate a visualization application that enables remotely located sci- entists to gain insights from large datasets. We also demonstrate climate

23

On mental privacy: the having of mental states  

E-Print Network (OSTI)

In three chapters this thesis seeks to demonstrate that (i) there historically has been no consensus in the use of the term 'mental privacy' and that several problematic doctrines are based on confused accounts of this term; (ii) there are contemporary debates which are maintained, in large order, by the opposing sides subscribing to different notions of mental privacy; and (iii) a preliminary investigation makes clear that both mental states with propositional content and mental states with non-propositional content are private in that both require the agent to have the state.

Dembitzer, Simon David

1998-01-01T23:59:59.000Z

24

Our River  

NLE Websites -- All DOE Office Websites (Extended Search)

River River Nature Bulletin No. 22 July 7, 1945 Forest Preserve District of Cook County Clayton F. Smith, President Roberts Mann, Superintendent of Conservation OUR RIVER The people of Cook County are missing a bet. They are not using their DesPlaines River. The other day we took a boat trip down that river from Lake County to Lawndale Avenue in Summit. It being a week day, we saw few people other than an occasional fisherman or pairs of strolling boys. Except for a bridge now and then, there were no signs or sounds of civilization. Chicago might have been a thousand miles away. We rested. There was isolation. There was peace. Once in a while a heron flew ahead of us; or a squirrel scampered up a tree; once we saw a family of young muskrats playing around the entrance to their den in the bank; twice we saw and heard a wood duck; again and again big fish plowed ripples surging ahead of us. It was shady and cool and still beneath the arching trees. We thought of the centuries this river had traveled. We were babes nuzzling again at the breast of Mother Nature.

25

Design and Analysis of Salmonid Tagging Studies in the Columbia Basin. Volume III, Experiment Designs and Statistical Models to Estimate the Effect of Transportation on Survival of Columbia River System Salmonids.  

DOE Green Energy (OSTI)

Experiment designs to estimate the effect of transportation on survival and return rates of Columbia River system salmonids are discussed along with statistical modeling techniques. Besides transportation, river flow and dam spill are necessary components in the design and analysis, otherwise questions as to the effects of reservoir drawdowns and increased dam spill may never be satisfactorily answered. Four criteria for comparing different experiment designs are: (1) feasibility; (2) clarity of results; (3) scope of inference; and (4) time to learn. A controlled experiment with treatments that are a combination of transport status (transported or left in-river), river flow level, and dam spill level should provide the clearest results of transport effect. The potential for bias due to interactions between year effects and the treatments is minimized by running as many treatments as possible within a single outmigration year. Relatedly, the most rapid learning will occur if several different treatments are implemented at randomly chosen time periods within thesame outmigration season. If the range of flow and dam manipulation includes scenarios of interest to managers, the scope of inference should be satisfactory. On the other hand these designs may be the least feasible; trying to manage the river system under a sequence of deliberately chosen flow regimes within a single season, for example, may be quite impractical. At the other end of the spectrum are designs that simply have two treatment combinations, transportation and being left in-river, and the influence of flow and spill are controlled for, if possible, in after-the-fact statistical analysis. Because of possible confounding influences of flow and spill on the transportation effect, these designs could yield the most ambiguous results and require the most years of experimentation to learn. If flows and spill are not manipulated in a planned, well defined, and impartial manner the scope and quality of inference may not be satisfactory. On the other hand, these designs are the simplest to implement. Implementation issues are: (1) The nature of flow and spill level manipulations will need clear definition, either in absolute terms, cfs, or relative terms, such as spilling 10% of the water. (2) Relatedly, system wide implementation of flow and spill levels will provide simpler interpretation of results than will mixing spill rates, for instance, between dams. Transporting fish from just one location will also simplify interpretation. (3) Tagging of experimental fish should be done well upstream of the dams with random assignment to transport or in-river groups done later, near the dams, to minimize biases from delayed tagging mortality. (4) Tagging with PIT tags and CWTs in combination will provide evidence of any potential homing problems. (5) High PIT tag retention rates are important to minimizing potential analysis problems (thus on-going research to improve retention is vital). (6) Approximate sample sizes to achieve a desired level of precision can be calculated fairly easily using formulas provided in the report.

Newman, Ken

1997-06-01T23:59:59.000Z

26

Savannah River Site  

NLE Websites -- All DOE Office Websites (Extended Search)

River Site Savannah River Site Savannah River Site (SRS) has mission responsibilities in nuclear weapons stockpile stewardship by ensuring the safe and reliable management of...

27

River Steamboats  

NLE Websites -- All DOE Office Websites (Extended Search)

River Steamboats River Steamboats Nature Bulletin No. 628-A February 12, 1977 Forest Preserve District of Cook County George W. Dunne, President Roland F. Eisenbeis, Supt. of Conservation RIVER STEAMBOATS The westward migration of the pioneer settlers and the rapid growth of agriculture, commerce and industry in the Middle West is in large part the story of water transportation on our inland waterways. The two main water routes were the chain of Great Lakes on the north and the Ohio River on the south. Sailing vessels carrying hundreds of tons were able to navigate on the Great Lakes almost as freely as on the ocean. Also, on the Ohio and Mississippi rivers heavy loads could be floated downstream from Pittsburgh to New Orleans -- almost 2000 miles. But boats had to be hauled back upstream by manpower -- grueling labor, stretching over weeks or months to move a few tons a few hundred miles. The coming of the steamboat a century and a half ago changed all this.

28

Red River Compact (Texas)  

Energy.gov (U.S. Department of Energy (DOE))

The Red River Compact Commission administers the Red River Compact to ensure that Texas receives its equitable share of quality water from the Red River and its tributaries as apportioned by the...

29

River Basin Commissions (Indiana)  

Energy.gov (U.S. Department of Energy (DOE))

This legislation establishes river basin commissions, for the Kankakee, Maumee, St. Joseph, and Upper Wabash Rivers. The commissions facilitate and foster cooperative planning and coordinated...

30

Maine Rivers Policy (Maine)  

Energy.gov (U.S. Department of Energy (DOE))

The Maine Rivers Policy accompanies the Maine Waterway Development and Conservation Act and provides additional protection for some river and stream segments, which are designated as outstanding...

31

Pecos River Compact (Texas)  

Energy.gov (U.S. Department of Energy (DOE))

This legislation authorizes the state's entrance into the Pecos River Compact, a joint agreement between the states of New Mexico and Texas. The compact is administered by the Pecos River Compact...

32

Sex education for the mentally handicapped  

Science Conference Proceedings (OSTI)

What will happen if sex education programs are presented to our ... effect of sex education on mentally handicapped individuals? .... Higher level films, on the.

33

Inhibition & mental effort: a moderation hypothesis.  

E-Print Network (OSTI)

??This investigation addresses the relationship between cognitive inhibition as an executive function of the working memory system and cognitive load as the mental effort experienced (more)

Yeigh, David Anthony

2011-01-01T23:59:59.000Z

34

Time Trends in Dutch Children's Mental Health.  

E-Print Network (OSTI)

??This study investigated time trends in Dutch children's and adolescent's mental health problems by comparing population samples from different time periods. From 1983 to 2003, (more)

Tick, N.T.

2007-01-01T23:59:59.000Z

35

Savannah River National Laboratory  

At a glance Remote Electrical Throw Device Engineers at the Savannah River National Laboratory ... sufficient manufacturing capacity, established dist ...

36

History of the Priest River Experiment Station  

E-Print Network (OSTI)

Swift fox reintroductions on the Blackfeet Indian Reservation, Montana, USA David E. Ausbanda, the Blackfeet Tribe and Defenders of Wildlife reintroduced 123 captive-raised swift foxes from 1998 to 2002 to the Blackfeet Indian Reservation, Montana, USA. We used two success criteria, a population growth rate P1

Wellner, Jon A.

37

Savannah River Site - Reports  

NLE Websites -- All DOE Office Websites (Extended Search)

Reports Reports Savannah River Site Review Reports 2013 Independent Oversight Review of the Savannah River Field Office Tritium Facilities Radiological Controls Activity-Level Implementation, November 2013 Independent Oversight Review of the Savannah River Site Salt Waste Processing Facility Safety Basis and Design Development, August 2013 Independent Oversight Review of the Employee Concerns Program at the Savannah River Operations Office, July 2013 Assessment of Nuclear Safety Culture at the Salt Waste Processing Facility Project, January 2013 Review of the Savannah River Site, Waste Solidification Building, Construction Quality of Mechanical Systems Installation and Selected Aspects of Fire Protection System Design, January 2013 Activity Reports 2013 Savannah River Site Waste Solidification Building Corrective Actions from the January 2013 Report on Construction Quality of Mechanical Systems Installation and Fire Protection Design, May 2013

38

Analysis of the Changing Microbial Phase in an Underground River Anaerobic Digestion Reactor  

Science Conference Proceedings (OSTI)

The underground river anaerobic fermentation system was adopted in this experiment was that a pipeline buried underground just like an underground river. The hydrolysis, acidification and degradation of initial fermentation were carried out when raw ... Keywords: underground river anaerobic digestion reactor, microbial phase, methane-producing bacteria, dominant bacteria

Bingbing Li; Xiao Bo; Zhiquan Hu

2009-10-01T23:59:59.000Z

39

Office of River Protection (ORP) and Washingotn River Protection Solutions,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of River Protection (ORP) and Washingotn River Protection Office of River Protection (ORP) and Washingotn River Protection Solutions, LLC (WRPS) Partnering Agreement for the DOE-EM Tank Operations Project Office of River Protection (ORP) and Washingotn River Protection Solutions, LLC (WRPS) Partnering Agreement for the DOE-EM Tank Operations Project The Mission of the Office of River Protection is to safely retrieve and treat Hanford's tank waste and close the Tank Farms to protect the Columbia River. Office of River Protection (ORP) and Washingotn River Protection Solutions, LLC (WRPS) Partnering Agreement for the DOE-EM Tank Operations Project More Documents & Publications 2011 Annual Workforce Analysis and Staffing Plan Report - Office of River Protection Consent Order, Washington River Protection Solutions, LLC - NCO-2011-01

40

Savannah River National Laboratory  

located in every town and city have the potential to be used as environmental ... Savannah River Nuclear Solutions, LLC. SRNS is responsible for

Note: This page contains sample records for the topic "river experi mental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Savannah River Remediation Procurement  

NLE Websites -- All DOE Office Websites (Extended Search)

and procedures, rules and regulations, terms and conditions and the orders and directives under which Savannah River Remediation LLC (SRR) develops, issues, administers and...

42

Savannah River Ecology Laboratory  

NLE Websites -- All DOE Office Websites

Field Sites SREL is supported largely by external funding. Major sources include DOE Environmental Management, Savannah River Nuclear Solutions, USGS, US Department of the...

43

Savannah River National Laboratory  

The coupling also provided excellent response to impact. ... used as a means of remote camera and equipment, ... Savannah River Nuclear Solutions, ...

44

Savannah River National Laboratory  

Savannah River Nuclear Solutions, LLC. SRNS is responsible for transferring its technologies to the private sector so that these technologies may have ...

45

Schlumberger soundings in the Upper Raft River and Raft River...  

Open Energy Info (EERE)

soundings in the Upper Raft River and Raft River Valleys, Idaho and Utah Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Report: Schlumberger soundings in the Upper...

46

Savannah River | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

River River Savannah River Following are compliance agreements for the Savannah River Site. Also included are short summaries of the agreements. Natural Resources Defense Council Consent Decree, May 26, 1988 Natural Resources Defense Council Consent Decree, May 26, 1988 Summary Savannah River Site Consent Order 99-155-W, October 11, 1999 Savannah River Site Consent Order 99-155-W, October 11, 1999 Summary Savannah River Site Consent Order 85-70-SW, November 7, 1985 Savannah River Site Consent Order 85-70-SW, November 7, 1985 Summary Savannah River Site Consent Order 95-22-HW, September 29, 1995 Savannah River Site Consent Order 95-22-HW, September 29, 1995 Summary Savannah River Site Consent Order 99-21-HW, July 13, 1999 Savannah River Site Consent Order 99-21-HW, July 13, 1999 Summary

47

about Savannah River National Laboratory  

S R N The Savannah River Site and the Savannah River National Laboratory are owned by the U.S. Department of Energy, and are managed and operated by Savannah River ...

48

Savannah River | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Savannah River Savannah River Following are compliance agreements for the Savannah River Site. Also included are short summaries of the agreements. Natural Resources Defense Council Consent Decree, May 26, 1988 Natural Resources Defense Council Consent Decree, May 26, 1988 Summary Savannah River Site Consent Order 99-155-W, October 11, 1999 Savannah River Site Consent Order 99-155-W, October 11, 1999 Summary Savannah River Site Consent Order 85-70-SW, November 7, 1985 Savannah River Site Consent Order 85-70-SW, November 7, 1985 Summary Savannah River Site Consent Order 95-22-HW, September 29, 1995 Savannah River Site Consent Order 95-22-HW, September 29, 1995 Summary Savannah River Site Consent Order 99-21-HW, July 13, 1999 Savannah River Site Consent Order 99-21-HW, July 13, 1999 Summary

49

Mental Representations Formed From Educational Website Formats  

Science Conference Proceedings (OSTI)

The increasing popularity of web-based distance education places high demand on distance educators to format web pages to facilitate learning. However, limited guidelines exist regarding appropriate writing styles for web-based distance education. This study investigated the effect of four different writing styles on readers mental representation of hypertext. Participants studied hypertext written in one of four web-writing styles (e.g., concise, scannable, objective, and combined) and were then administered a cued association task intended to measure their mental representations of the hypertext. It is hypothesized that the scannable and combined styles will bias readers to scan rather than elaborately read, which may result in less dense mental representations (as identified through Pathfinder analysis) relative to the objective and concise writing styles. Further, the use of more descriptors in the objective writing style will lead to better integration of ideas and more dense mental representations than the concise writing style.

Elizabeth T. Cady; Kimberly R. Raddatz; Tuan Q. Tran; Bernardo de la Garza; Peter D. Elgin

2006-10-01T23:59:59.000Z

50

River Edge Redevelopment Zone (Illinois)  

Energy.gov (U.S. Department of Energy (DOE))

The purpose of the River Edge Redevelopment Program is to revive and redevelop environmentally challenged properties adjacent to rivers in Illinois.

51

from Savannah River National Laboratory  

operated by Savannah River Nuclear Solutions. SRNL offers innovative solutions ... The decommissioning of F Area at the Savannah River Site involves long-term management

52

Web Sites Related to Mental Health Web Sites Related to Mental Health  

E-Print Network (OSTI)

Web Sites Related to Mental Health Web Sites Related to Mental Health American Academy of Child://www.usdoj.gov/crt/ada/adahom1.htm file:///C|/Program%20Files/Adobe/Adobe%20Dreamweaver%...inks/Web%20Sites%20Related%20to%20

de Lijser, Peter

53

Savannah River National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

Savannah River National Laboratory Savannah River National Laboratory srnl.doe.gov SRNL is a DOE National Laboratory operated by Savannah River Nuclear Solutions. At a glance Additive Manufacturing (3D Printing): Selectively Printed Conductive Pathways Researchers at the Savannah River National Laboratory (SRNL) have developed a rapid prototype conductive material that can be used for electrical shielding or circuit fabrication. Background Several rapid prototype technologies currently exist. A few of the technologies produce metallic parts, but the majority produce nonconductive parts made from various grades of plastic. In all of these technologies however, only conductive material or nonconductive material can be used within one part created. There is no known option for 3D printing conductive material for

54

Sioux River Ethanol LLC | Open Energy Information  

Open Energy Info (EERE)

River Ethanol LLC Jump to: navigation, search Name Sioux River Ethanol LLC Place Hudson, South Dakota Zip 57034 Product Farmer owned ethanol producer, Sioux River Ethanol is...

55

Scenic River Protection Policy, Minnesota Wild and Scenic Rivers Act  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Scenic River Protection Policy, Minnesota Wild and Scenic Rivers Scenic River Protection Policy, Minnesota Wild and Scenic Rivers Act (Minnesota) Scenic River Protection Policy, Minnesota Wild and Scenic Rivers Act (Minnesota) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Minnesota Program Type Siting and Permitting

56

A Framework for Measurement Feedback to Improve Decision-Making in Mental Health  

E-Print Network (OSTI)

The organizational context of childrens mental healthorganizational norms such as culture and climate in mental health

2010-01-01T23:59:59.000Z

57

Three fold system (3FS) for mental health domain  

Science Conference Proceedings (OSTI)

Along with an increase in the number of mentally ill people, research into all aspects of mental health has increased in recent years. In all disciplines information is the key to success but major problems adversely affect the efficiency and effectiveness ... Keywords: data mining, health information systems, intelligent information retrieval, mental health research, ontology-based multi-agent systems

Maja Hadzic; Roberta Ann Cowan

2007-11-01T23:59:59.000Z

58

Tracer Testing At Raft River Geothermal Area (1983) | Open Energy  

Open Energy Info (EERE)

3) 3) Exploration Activity Details Location Raft River Geothermal Area Exploration Technique Tracer Testing Activity Date 1983 Usefulness not indicated DOE-funding Unknown Exploration Basis To develop chemical tracing procedures for geothermal areas. Notes Two field experiments were conducted to develop chemical tracer procedures for use with injection-backflow testing, one on the fracture-permeability Raft River reservoir and the other on the matrix-permeability East Mesa reservoir. Results from tests conducted with incremental increases in the injection volume at both East Mesa and Raft River suggests that, for both reservoirs, permeability remained uniform with increasing distance from the well bore. Increased mixing during quiescent periods, between injection and

59

Modeling the mental differentiation task with EEG  

Science Conference Proceedings (OSTI)

Differentiation in human beings is the act of perceiving the difference in or between objects. In other words, it is the mental process taking place to discriminate one thing from others, a common task performed by a person on a very regular basis. Making ... Keywords: BCI, EEG, artifical neural network, biosignal processing, differencitation tasks

Tan Vo; Tom Gedeon; Dat Tran

2012-11-01T23:59:59.000Z

60

Shared mental models in improvisational theatre  

Science Conference Proceedings (OSTI)

This article presents our currents findings from an empirical study of the cognition employed by performers in improvisational theatre. Improvised theatrical performance is an activity in which one or more individuals create a dramatic or comedic performance ... Keywords: cognition, improvisation, intelligent agents, mental models, theatre

Daniel Fuller; Brian Magerko

2011-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "river experi mental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

River Protection.PDF  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

cc: cc: DOE/IG-0506 I N S P E C T I O N R E P O R T U.S. DEPARTMENT OF ENERGY OFFICE OF INSPECTOR GENERAL OFFICE OF INSPECTIONS I N S P E C T I O N O F SELECTED ASPECTS OF THE OFFICE OF RIVER PROTECTION PERFORMANCE-BASED INCENTIVE PROGRAM JUNE 2001 U.S. DEPARTMENT OF ENERGY Washington, DC 20585 June 14, 2001 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman /s/ Inspector General SUBJECT: INFORMATION: Report on "Inspection of Selected Aspects of the Office of River Protection Performance-Based Incentive Program" BACKGROUND The Office of River Protection (ORP), which reports to the Office of Environmental Management, is responsible for remediation of the radioactive waste stored in tanks at the Hanford Site in the State of Washington. For Fiscal Year (FY) 2000, ORP established 26 performance-based contract

62

Rivanna River Basin Commission (Virginia)  

Energy.gov (U.S. Department of Energy (DOE))

The Rivanna River Basin Commission is an independent local entity tasked with providing guidance for the stewardship and enhancement of the water quality and natural resources of the Rivanna River...

63

from Savannah River National Laboratory  

Operated by Savannah River Nuclear Solutions for the U.S. Department of Energy near Aiken, S.C. E from Savannah River National Laboratory PAGE 2 OF 2 ...

64

Savannah River Nuclear Solutions LLC  

Savannah River Nuclear Solutions LLC Permission to Publish KNOW ALL MEN BY THESE PRESENTS, that the undersigned (hereinafter referred to

65

Aquatic Supplement Hood River Subbasin  

E-Print Network (OSTI)

crystal springs 4 Crystal Sp WD bypass reach to overflow? ? 4 dog river 3 City of TD none 3 no infoAppendix B Aquatic Supplement Contents Hood River Subbasin Tables and Figures: Table 1. Current estimated peak summer withdrawals from the Hood River Table 2. Historic lake stocking and fish introductions

66

Kootenai River Resident Fish Assessment, FY2008 KTOI Progress Report.  

DOE Green Energy (OSTI)

The overarching goal of project 1994-049-00 is to recover a productive, healthy and biologically diverse Kootenai River ecosystem, with emphasis on native fish species rehabilitation. It is especially designed to aid the recovery of important fish stocks, i.e. white sturgeon, burbot, bull trout, kokanee and several other salmonids important to the Kootenai Tribe of Idaho and regional sport-fisheries. The objectives of the project have been to address factors limiting key fish species within an ecosystem perspective. Major objectives include: establishment of a comprehensive and thorough biomonitoring program, investigate ecosystem--level in-river productivity, test the feasibility of a large-scale Kootenai River nutrient addition experiment (completed), to evaluate and rehabilitate key Kootenai River tributaries important to the health of the lower Kootenai River ecosystem, to provide funding for Canadian implementation of nutrient addition and monitoring in the Kootenai River ecosystem (Kootenay Lake) due to lost system productivity created by construction and operation of Libby Dam, mitigate the cost of monitoring nutrient additions in Arrow Lakes due to lost system productivity created by the Libby-Arrow water swap, provide written summaries of all research and activities of the project, and, hold a yearly workshop to convene with other agencies and institutions to discuss management, research, and monitoring strategies for this project and to provide a forum to coordinate and disseminate data with other projects involved in the Kootenai River basin.

Holderman, Charles

2009-06-26T23:59:59.000Z

67

Hood River Passive House  

Science Conference Proceedings (OSTI)

The Hood River Passive Project was developed by Root Design Build of Hood River Oregon using the Passive House Planning Package (PHPP) to meet all of the requirements for certification under the European Passive House standards. The Passive House design approach has been gaining momentum among residential designers for custom homes and BEopt modeling indicates that these designs may actually exceed the goal of the U.S. Department of Energy's (DOE) Building America program to reduce home energy use by 30%-50% (compared to 2009 energy codes for new homes). This report documents the short term test results of the Shift House and compares the results of PHPP and BEopt modeling of the project.

Hales, D.

2013-03-01T23:59:59.000Z

68

North Woods River: The St. Croix River in Upper Midwest History  

E-Print Network (OSTI)

Review: North Woods River: The St. Croix River in Upperand Karamanski, Theodore J. North Woods River: The St. Croixbeauty and splendor. In North Woods River, Eileen M. McMahon

Karalus, Daniel E

2011-01-01T23:59:59.000Z

69

Savannah River Site - Enforcement Documents  

NLE Websites -- All DOE Office Websites (Extended Search)

Enforcement Documents Enforcement Documents Savannah River Site Preliminary Notice of Violation issued to Savannah River Nuclear Solutions, LLC related to a Puncture Wound Injury resulting in a Radiological Uptake at the Savannah River Site, July 22, 2011 (NEA-2011-02) Consent Order issued to Parsons Infrastructure & Technology Group, Inc., related to Nuclear Facility Construction Deficiencies and Subcontractor Oversight at the Salt Waste Processing Facility at the Savannah River Site, April 13, 2010 Enforcement Letter issued to Amer Industrial Technologies, Inc. related to Weld Deficiencies at the Salt Waste Processing Facility at the Savannah River Site, April 13, 2010 Enforcement Letter issued to Parsons Technology Development & Fabrication Complex related to Deficiencies in the Fabrication of Safety Significant Embed Plates at the Salt Waste Processing Facility at the Savannah River Site, April 13, 2010

70

Florida Nuclear Profile - Crystal River  

U.S. Energy Information Administration (EIA) Indexed Site

Crystal River1" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

71

Louisiana Nuclear Profile - River Bend  

U.S. Energy Information Administration (EIA) Indexed Site

River Bend" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

72

about Savannah River National Laboratory  

Savannah River Nuclear Solutions ... Office of Environmental Management Applied research ... in the areas of national security, clean energy and environmental stewardship

73

Susquehanna River Basin Compact (Maryland)  

Energy.gov (U.S. Department of Energy (DOE))

This legislation enables the state's entrance into the Susquehanna River Basin Compact, which provides for the conservation, development, and administration of the water resources of the...

74

from Savannah River National Laoratory  

of Energys Savannah River Site near Aiken, South Carolina ... guidance for understanding natural complexity and heterogeneity in the environment. Impact

75

about Savannah River National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

Tritium Effects on Materials In an effort to ensure the safety of the nation's nuclear weapons stockpile, the Savannah River National Laboratory (SRNL) maintains an active role in...

76

Energy and Water Cycles in a High-Latitude, North-Flowing River System  

Science Conference Proceedings (OSTI)

The MacKenzie Global Energy and Water Cycle Experiment (GEWEX) Study, Phase 1, seeks to improve understanding of energy and water cycling in the Mackenzie River basin (MRB) and to initiate and test atmospheric, hydrologic, and coupled models that ...

W. R. Rouse; E. M. Blyth; R. W. Crawford; J. R. Gyakum; J. R. Janowicz; B. Kochtubajda; H. G. Leighton; P. Marsh; L. Martz; A. Pietroniro; H. Ritchie; W. M. Schertzer; E. D. Soulis; R. E. Stewart; G. S. Strong; M. K. Woo

2003-01-01T23:59:59.000Z

77

Using a Mental Measurements Yearbook Review to Evaluate a Test  

E-Print Network (OSTI)

1 Using a Mental Measurements Yearbook Review to Evaluate a Test Anthony J. Nitko Professor, University of Arizona Introduction Once you have located a test, you will want to read its Mental Measurements Yearbook (MMY) review. You need to use the review to make judgments about the quality of the test

Graham, Nick

78

Technology-Mediated Collaboration, Shared Mental Model and Task Performance  

Science Conference Proceedings (OSTI)

This study takes a direct observation research approach to examine how the impact of collaboration mode on team productivity and process satisfaction is mediated by shared mental model. Team cognition and social impact theories are integrated to provide ... Keywords: Behavior Rating, Observer Rating, Shared Mental Model, Team Cognition, Teamwork, Technology-Mediated Collaboration, Virtual Team

Hayward P. Andres

2012-01-01T23:59:59.000Z

79

Mental models of ambient systems: a modular research framework  

Science Conference Proceedings (OSTI)

This paper outlines our current research program in the fields of ambient intelligence and context-aware computing and the tools we are building to accomplish this research program. From a discussion of our conception of mental models in the domain of ... Keywords: ambient intelligence, context awareness, mental models

Felix Schmitt; Jrg Cassens; Martin Christof Kindsmller; Michael Herczeg

2011-09-01T23:59:59.000Z

80

The implementation research institute: training mental health implementation researchers in the United States  

E-Print Network (OSTI)

Public Health Epidemiology b Organizational Behavior andor study of organizational factors in mental health serviceOrganizational issues in implementing EBP in child welfare and mental health

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "river experi mental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Policy to implementation: evidence-based practice in community mental health study protocol  

E-Print Network (OSTI)

Institutes of Health; OSC: Organizational Social Context;evidence from organizational theory to mental health serviceon Youth Mental health: Assessing the organizational social

2013-01-01T23:59:59.000Z

82

Evidence-Based Mental Health Programs in Schools: Barriers and Facilitators of Successful Implementation  

E-Print Network (OSTI)

mental health services, than the organizational climate ofof mental health services in schools, school organizationalhealth services: intervention charac- teristics, practitioner characteristics, client characteristics, service delivery characteristics, organizational

Langley, Audra K.; Nadeem, Erum; Kataoka, Sheryl H.; Stein, Bradley D.; Jaycox, Lisa H.

2010-01-01T23:59:59.000Z

83

Linking post-disaster mental health to the erosion of social fabric.  

E-Print Network (OSTI)

??This dissertation aimed to dissect the complex nature of post-disaster mental health problems. Current (research) perspectives define disaster mental health as a construct that is (more)

Wind, T.R.

2013-01-01T23:59:59.000Z

84

Evidence-Based Mental Health Programs in Schools: Barriers and Facilitators of Successful Implementation  

E-Print Network (OSTI)

based interventions in schools: Developers views onbarriers and facilitators. School Mental Health, 1, 2636.D. , & Robinson, G. (2005). School mental health services in

Langley, Audra K.; Nadeem, Erum; Kataoka, Sheryl H.; Stein, Bradley D.; Jaycox, Lisa H.

2010-01-01T23:59:59.000Z

85

Pennsylvania Scenic Rivers Program | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pennsylvania Scenic Rivers Program Pennsylvania Scenic Rivers Program Pennsylvania Scenic Rivers Program < Back Eligibility Utility Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Rural Electric Cooperative Transportation Savings Category Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Pennsylvania Program Type Environmental Regulations Siting and Permitting Provider Pennsylvania Department of Conservation and Natural Resources Rivers included in the Scenic Rivers System will be classified, designated and administered as Wild, Scenic, Pastoral, Recreational and Modified Recreational Rivers (Sections 4; (a) (1) of the Pennsylvania Scenic Rivers Act). Low dams are permitted on Modified Recreational Rivers, but are not

86

Wisconsin River Power Company | Open Energy Information  

Open Energy Info (EERE)

River Power Company Jump to: navigation, search Name Wisconsin River Power Company Place Wisconsin Utility Id 20863 Utility Location Yes Ownership I NERC Location RFC NERC MRO Yes...

87

Canadian River Compact (Texas) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Administration Other Agencies You are here Home Savings Canadian River Compact (Texas) Canadian River Compact (Texas) Eligibility Utility Fed. Government Commercial...

88

Hydrologic Variability of the Cosumnes River Floodplain  

E-Print Network (OSTI)

Preserve (CRP) floodplain, Michigan Bar streamflow gage,and mean monthly streamflow streamflow at River at Michiganat Michigan Bar. at Cosumnes Cosumnes River Bar. SAN

Booth, Eric; Mount, Jeff; Viers, Joshua H.

2006-01-01T23:59:59.000Z

89

Big River Resources LLC | Open Energy Information  

Open Energy Info (EERE)

Name Big River Resources LLC Place West Burlington, Iowa Zip 52655 Product Dry-mill bioethanol producer with a cooperative structure. References Big River Resources LLC1...

90

Ohio River Ecological Research Program  

Science Conference Proceedings (OSTI)

This report presents the results of the 2009 Ohio River Ecological Research Program (ORERP) fish community sampling near 14 Ohio River power plants. The sampling program consisted of adult/juvenile fish, habitat, and water quality field studies conducted upstream and downstream of the participating power plants.

2012-02-28T23:59:59.000Z

91

Savannah River Site ECS-2 tests uncertainty report  

SciTech Connect

This document presents a measurement uncertainty analysis for the instruments used in the ECS-2 test series conducted for the Savannah River Site at the Idaho National Engineering Laboratory. The tests are a series of downflow dryout heat transfer experiments designed to support computer code development and verification in setting limits for the Savannah River Production reactors. The measurements include input current, voltage, and power; air and water flows, fluid and metal temperatures, and absolute and differential pressures. An analysis of the data acquisition system as it relates to these measurements is also included. 18 refs., 6 figs., 12 tabs.

Wilkins, S.C.; Larson, R.A.

1990-07-01T23:59:59.000Z

92

RIVER PROTECTION PROJECT SYSTEM PLAN  

SciTech Connect

The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, the ORP is responsible for the retrieval, treatment, and disposal of the approximately 57 million gallons of radioactive waste contained in the Hanford Site waste tanks and closure of all the tanks and associated facilities. The previous revision of the System Plan was issued in September 2003. ORP has approved a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. The ORP has established contracts to implement this strategy to establish a basic capability to complete the overall mission. The current strategy for completion of the mission uses a number of interrelated activities. The ORP will reduce risk to the environment posed by tank wastes by: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) for treatment and disposal; (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) and about half of the low-activity waste (LAW) contained in the tank farms, and maximizing its capability and capacity; (3) Developing and deploying supplemental treatment capability or a second WTP LAW Facility that can safely treat about half of the LAW contained in the tank farms; (4) Developing and deploying treatment and packaging capability for transuranic (TRU) tank waste for shipment to and disposal at the Waste Isolation Pilot Plant (WIPP); (5) Deploying interim storage capacity for the immobilized HLW and shipping that waste to Yucca Mountain for disposal; (6) Operating the Integrated Disposal Facility for the disposal of immobilized LAW, along with the associated secondary waste, (7) Closing the SST and DST tank farms, ancillary facilities, and al1 waste management and treatment facilities, (8) Developing and implementing technical solutions to mitigate the impact from substantial1y increased estimates of Na added during the pretreatment of the tank waste solids, This involves a combination of: (1) refining or modifying the flowsheet to reduce the required amount of additional sodium, (2) increasing the overall LAW vitrification capacity, (3) increasing the incorporation of sodium into the LAW glass, or (4) accepting an increase in mission duration, ORP has made and continues to make modifications to the WTP contract as needed to improve projected plant performance and address known or emerging risks, Key elements of the implementation of this strategy are included within the scope of the Tank Operations Contract, currently in procurement Since 2003, the ORP has conducted over 30 design oversight assessments of the Waste Treatment and Immobilization Plant (WTP). The estimated cost at completion has increased and the schedule for construction and commissioning of the WTP has extended, The DOE, Office of Environmental Management (EM), sanctioned a comprehensive review of the WTP flowsheet, focusing on throughput. In 2005, the TFC completed interim stabilization of the SSTs and as of March 2007, has completed the retrieval of seven selected SSTs. Demonstration of supplemental treatment technologies continues. The ongoing tank waste retrieval experience, progress with supplemental treatment technologies, and changes in WTP schedule led to the FY 2007 TFC baseline submittal in November 2006. The TFC baseline submittal was developed before the WTP schedule was fully understood and approved by ORP, and therefore reflects an earlier start date for the WTP facilities. This System Plan is aligned with the current WTP schedule with hot commissioning beginning in 2018 and full operations beginning in 2019. Major decisions regarding the use of supplemental treatment and the associated technology, the ultimate needed capacity, and its relationship to the WTP have not yet been finalized. This System Plan assumes that the outcome of

CERTA PJ

2008-07-10T23:59:59.000Z

93

RIVER PROTECTION PROJECT SYSTEM PLAN  

Science Conference Proceedings (OSTI)

The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and disposal at the Waste Isolation Pilot Plant (WIPP) in New Mexico. (6) Deploying interim storage capacity for the immobilized high-level waste (IHLW) pending determination of the final disposal pathway. (7) Closing the SST and DST tank farms, ancillary facilities, and all associated waste management and treatment facilities. (8) Optimizing the overall mission by resolution of technical and programmatic uncertainties, configuring the tank farms to provide a steady, well-balanced feed to the WTP, and performing trade-offs of the required amount and type of supplemental treatment and of the amount of HLW glass versus LAW glass. ORP has made and continues to make modifications to the WTP contract as needed to improve projected plant performance and address known or emerging risks. Key elements needed to implement the strategy described above are included within the scope of the Tank Operations Contract (TOC). Interim stabilization of the SSTs was completed in March 2004. As of April 2009, retrieval of seven SSTs has been completed and retrieval of four additional SSTs has been completed to the limits of technology. Demonstration of supplemental LAW treatment technologies has stopped temporarily pending revision of mission need requirements. Award of a new contract for tank operations (TOC), the ongoing tank waste retrieval experience, HLW disposal issues, and uncertainties in waste feed delivery and waste treatment led to the revision of the Performance Measurement Baseline (PM B), which is currently under review prior to approval. 6 This System Plan is aligned with the current WTP schedule, with hot commissioning beginning in 2018, and full operations beginning in late 2019. Major decisions regarding the use of supplemental treatment and the associated technology, the ultimate needed capacity, and its relationship to the WTP have not yet been finalized. This System Plan assumes that the outcome of these decisions will be to provide a second LAW vitrification facility. No final implementation decisions regarding supplemental technology can be made until the Tank Closure and

CERTA PJ; KIRKBRIDE RA; HOHL TM; EMPEY PA; WELLS MN

2009-09-15T23:59:59.000Z

94

RIVER PROTECTION PROJECT SYSTEM PLAN  

SciTech Connect

The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and disposal at the Waste Isolation Pilot Plant (WIPP) in New Mexico. (6) Deploying interim storage capacity for the immobilized high-level waste (IHLW) pending determination of the final disposal pathway. (7) Closing the SST and DST tank farms, ancillary facilities, and all associated waste management and treatment facilities. (8) Optimizing the overall mission by resolution of technical and programmatic uncertainties, configuring the tank farms to provide a steady, well-balanced feed to the WTP, and performing trade-offs of the required amount and type of supplemental treatment and of the amount of HLW glass versus LAW glass. ORP has made and continues to make modifications to the WTP contract as needed to improve projected plant performance and address known or emerging risks. Key elements needed to implement the strategy described above are included within the scope of the Tank Operations Contract (TOC). Interim stabilization of the SSTs was completed in March 2004. As of April 2009, retrieval of seven SSTs has been completed and retrieval of four additional SSTs has been completed to the limits of technology. Demonstration of supplemental LAW treatment technologies has stopped temporarily pending revision of mission need requirements. Award of a new contract for tank operations (TOC), the ongoing tank waste retrieval experience, HLW disposal issues, and uncertainties in waste feed delivery and waste treatment led to the revision of the Performance Measurement Baseline (PM B), which is currently under review prior to approval. 6 This System Plan is aligned with the current WTP schedule, with hot commissioning beginning in 2018, and full operations beginning in late 2019. Major decisions regarding the use of supplemental treatment and the associated technology, the ultimate needed capacity, and its relationship to the WTP have not yet been finalized. This System Plan assumes that the outcome of these decisions will be to provide a second LAW vitrification facility. No final implementation decisions regarding supplemental technology can be made until the Tank Closure and

CERTA PJ; KIRKBRIDE RA; HOHL TM; EMPEY PA; WELLS MN

2009-09-15T23:59:59.000Z

95

RIVER PROTECTION PROJECT SYSTEM PLAN  

SciTech Connect

The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, the ORP is responsible for the retrieval, treatment, and disposal of the approximately 57 million gallons of radioactive waste contained in the Hanford Site waste tanks and closure of all the tanks and associated facilities. The previous revision of the System Plan was issued in September 2003. ORP has approved a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. The ORP has established contracts to implement this strategy to establish a basic capability to complete the overall mission. The current strategy for completion of the mission uses a number of interrelated activities. The ORP will reduce risk to the environment posed by tank wastes by: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) for treatment and disposal; (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) and about half of the low-activity waste (LAW) contained in the tank farms, and maximizing its capability and capacity; (3) Developing and deploying supplemental treatment capability or a second WTP LAW Facility that can safely treat about half of the LAW contained in the tank farms; (4) Developing and deploying treatment and packaging capability for transuranic (TRU) tank waste for shipment to and disposal at the Waste Isolation Pilot Plant (WIPP); (5) Deploying interim storage capacity for the immobilized HLW and shipping that waste to Yucca Mountain for disposal; (6) Operating the Integrated Disposal Facility for the disposal of immobilized LAW, along with the associated secondary waste, (7) Closing the SST and DST tank farms, ancillary facilities, and al1 waste management and treatment facilities, (8) Developing and implementing technical solutions to mitigate the impact from substantial1y increased estimates of Na added during the pretreatment of the tank waste solids, This involves a combination of: (1) refining or modifying the flowsheet to reduce the required amount of additional sodium, (2) increasing the overall LAW vitrification capacity, (3) increasing the incorporation of sodium into the LAW glass, or (4) accepting an increase in mission duration, ORP has made and continues to make modifications to the WTP contract as needed to improve projected plant performance and address known or emerging risks, Key elements of the implementation of this strategy are included within the scope of the Tank Operations Contract, currently in procurement Since 2003, the ORP has conducted over 30 design oversight assessments of the Waste Treatment and Immobilization Plant (WTP). The estimated cost at completion has increased and the schedule for construction and commissioning of the WTP has extended, The DOE, Office of Environmental Management (EM), sanctioned a comprehensive review of the WTP flowsheet, focusing on throughput. In 2005, the TFC completed interim stabilization of the SSTs and as of March 2007, has completed the retrieval of seven selected SSTs. Demonstration of supplemental treatment technologies continues. The ongoing tank waste retrieval experience, progress with supplemental treatment technologies, and changes in WTP schedule led to the FY 2007 TFC baseline submittal in November 2006. The TFC baseline submittal was developed before the WTP schedule was fully understood and approved by ORP, and therefore reflects an earlier start date for the WTP facilities. This System Plan is aligned with the current WTP schedule with hot commissioning beginning in 2018 and full operations beginning in 2019. Major decisions regarding the use of supplemental treatment and the associated technology, the ultimate needed capacity, and its relationship to the WTP have not yet been finalized. This System Plan assumes that the outcom

CERTA PJ

2008-07-10T23:59:59.000Z

96

Savannah River Site Homepage  

NLE Websites -- All DOE Office Websites (Extended Search)

7/2014 7/2014 SEARCH GO News Releases Video Releases Upcoming Events 12.31.13 Dr. Sam Fink Earns Donald Orth Lifetime Achievement Award 12.31.13 Savannah River Remediation Issues Fiscal Year 2013 Annual Report 12.18.13 Prototype System Brings Advantages of Wireless Technology to Secure Environment CLICK HERE FOR ADDITIONAL NEWS RELEASES CLICK HERE for our email news service, govDELIVERY 2013 PMI Project of the Year Award - Click to play on YouTube 2013 PMI Project of the Year Award Finalist: SRS Recovery Act Project PLAY VIDEO CLICK HERE FOR ADDITIONAL VIDEO RELEASES Enterprise.SRS - Safety and Security begin with me! SRS Status & Emergency Information * Cold War Patriot's Resource Fair - Aiken, SC (04.25.13) * 3rd Annual Small Modular Reactor Conference - Columbia, SC (04.16-17.13)

97

Field Mapping At Raft River Geothermal Area (1993) | Open Energy  

Open Energy Info (EERE)

Exploration Activity: Field Mapping At Raft River Geothermal Area (1993) Exploration Activity: Field Mapping At Raft River Geothermal Area (1993) Exploration Activity Details Location Raft River Geothermal Area Exploration Technique Field Mapping Activity Date 1993 Usefulness not indicated DOE-funding Unknown Exploration Basis To determine the importance of Early to Middle Miocene period in the northern Basin and Range region. Notes New apatite fission track cooling age and track length data, supplemented by other information, point to the Early to Middle Miocene as an additional time of very significant extension-induced uplift and range formation. Many ranges in a 700-km-long north-south corridor from the Utah-Nevada-Idaho border to southernmost Nevada experience extension and major exhumation in Early to Middle Miocene time. Reconnaissance apatite ages from the Toiyabe

98

Marble River | Open Energy Information  

Open Energy Info (EERE)

River River Jump to: navigation, search Name Marble River Facility Marble River Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner EDP Renewables North America LLC Developer EDP Renewables North America LLC Energy Purchaser Merchant Location Churubusco NY Coordinates 44.9406848°, -73.9303307° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.9406848,"lon":-73.9303307,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

99

Black Hawk Lake Fresno River  

E-Print Network (OSTI)

Black Hawk Lake Fresno River R D 4 0 0 RD 415 HWY41 RD 207 REVISRD YO SEM ITE SP RINGS P KY LILLEY County Rosedale Ranch Revis Mountain Daulton Spring Red Top Lookout Buford Mountain Black Hawk Lake

Wang, Zhi

100

Caney River | Open Energy Information  

Open Energy Info (EERE)

River River Jump to: navigation, search Name Caney River Facility Caney River Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Enel Green Power North America Inc. Developer Tradewind Energy LLC Energy Purchaser Tennessee Valley Authority Location Elk County KS Coordinates 37.448424°, -96.425027° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.448424,"lon":-96.425027,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "river experi mental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

River-Forced Estuarine Plumes  

Science Conference Proceedings (OSTI)

The development, maintenance, and dissipation of river-forced estuarine plumes with and without seaward sloping bottom are studied by use of a three-dimensional, primitive-equation model. Inside the estuary, discussion is focused on how the ...

Shenn-Yu Chao

1988-01-01T23:59:59.000Z

102

Savannah River Operations Office Homepage  

NLE Websites -- All DOE Office Websites

Savannah River Operations banner art and link to DOE Link to Energy.gov Link to Energy.gov National Day of Remembrance NOTICE TO USERS Use of this system constitutes consent to...

103

Colorado River Basin Hydroclimatic Variability  

Science Conference Proceedings (OSTI)

An analysis of annual hydroclimatic variability in the Upper Colorado River basin (UCRB) for the period of 19062006 was performed to understand the dominant modes of multidecadal variability. First, wavelet-based spectral analysis was employed ...

Kenneth Nowak; Martin Hoerling; Balaji Rajagopalan; Edith Zagona

2012-06-01T23:59:59.000Z

104

Mental health and the impact of ubiquitous technologies  

Science Conference Proceedings (OSTI)

This Theme issue focuses on the emerging research of ubiquitous technologies to support mental health. So far, the majority of work presented in the field of ubiquitous healthcare has focused on supporting people affected by somatic diseases. However, ...

Bert Arnrich; Venet Osmani; Jakob Bardram

2013-02-01T23:59:59.000Z

105

Savannah River Site (SRS) Experience with Preparing Salt Batches  

Beneficially reuse existing waste. 6 SRS Liquid Waste System Salt Processing. 7 Background Tk49 is the feed tank to ARP / MCU facilities

106

BLM Humboldt River Field Office | Open Energy Information  

Open Energy Info (EERE)

Humboldt River Field Office Jump to: navigation, search Name BLM Humboldt River Field Office Short Name Humboldt River Parent Organization BLM Winnemucca District Office Address...

107

Accelerating Clean-up at Savannah River | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Accelerating Clean-up at Savannah River Accelerating Clean-up at Savannah River Accelerating Clean-up at Savannah River More Documents & Publications Integrated Project Team RM...

108

Savannah River Site: Plutonium Preparation Project (PuPP) at...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site: Plutonium Preparation Project (PuPP) at Savannah River Site Savannah River Site: Plutonium Preparation Project (PuPP) at Savannah River Site Full Document and Summary...

109

Comments of the Lower Colorado River Authority | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lower Colorado River Authority Comments of the Lower Colorado River Authority Comments of the Lower Colorado River Authority on Implementing the National Broadband Plan by Studying...

110

The 'Watcher's Stage' in Lower Colorado River Indian Agriculture  

E-Print Network (OSTI)

Primitive Subsistence on the Lower Colorado and Gila Rivers.Watcher's Stage' in Lower Colorado River Indian AgricultureIndian tribes along the Colorado River to various interior

Lawton, Harry W.; Wilke, Philip J.

1977-01-01T23:59:59.000Z

111

PP-41 Mirias River Electric Cooperative, Inc. | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 Mirias River Electric Cooperative, Inc. PP-41 Mirias River Electric Cooperative, Inc. Presidential Permit authorizing Mirias River Electric Cooperative, Inc. to constuct,...

112

Adult Salmonid PIT-TAG Returns to Columbia River`s Lower Granite Dam.  

DOE Green Energy (OSTI)

The results of an analysis of the returns of PIT-tagged Snake River spring chinook and steelhead detected at Lower Granite Dam are summarized. Included is theoretical work on statistical power calculations for tests of return rates. The phrase return rate will be taken to mean return and detection rate. Knowledge that a fish has returned depends upon it being detected at Lower Granite Dam. Some returns are unaccounted for because they go through the navigation lock or manage to go through the adult bypass undetected. (1) Adult PIT tag recoveries to date are informative at least from a qualitative perspective. (2) The tagging levels by geographic region, rearing type, and, for chinook, life history stage have varied considerably since PIT tagging began on the Columbia River system. Early tagging studies were directed at Juvenile problems rather than adult return rates. As a result, comparisons in adult return rates between years, regions, etc., are more difficult. Global conclusions about the effect of potential treatments and/or natural factors, such as region of origin, on adult return rates are difficult to make until a more balanced. more consistent tagging study is implemented. (3) Along the same lines, tagging levels will need to be increased considerably if experiments are to be conducted to determine factors that affect return rates. E.g., approximately 46,000 fish in both the control and the treatment groups need to be PIT-tagged to detect a statistically significant difference with 80% probability. (4) Analysis of the available data suggests that life stage (parr or smolt), rearing type (hatchery or wild), and geographic location all affect the return rates for spring chinook. The data are limited, however. (5) Return rates for Snake River steelhead are roughly an order of magnitude greater than Snake River spring chinook return rates.

Newman, Ken

1995-04-01T23:59:59.000Z

113

Deep drilling data, Raft River geothermal area, Idaho-Raft River...  

Open Energy Info (EERE)

Deep drilling data, Raft River geothermal area, Idaho-Raft River geothermal exploration well sidetrack-C Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Report: Deep...

114

Savannah River Site Retires Coal-Fired D-Area Powerhouse after Nearly 60  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Retires Coal-Fired D-Area Powerhouse after Savannah River Site Retires Coal-Fired D-Area Powerhouse after Nearly 60 Years of Service Savannah River Site Retires Coal-Fired D-Area Powerhouse after Nearly 60 Years of Service May 1, 2012 - 12:00pm Addthis SRNS Maintenance Supervisor Steve Cooper, left to right, Control Room Operator Robert Dicks, and Deputy Operations Manager Ren Hatfield stand near a boiler unit of the DArea powerhouse. The three workers have a combined experience of 83 years at the facility. SRNS Maintenance Supervisor Steve Cooper, left to right, Control Room Operator Robert Dicks, and Deputy Operations Manager Ren Hatfield stand near a boiler unit of the DArea powerhouse. The three workers have a combined experience of 83 years at the facility. AIKEN, S.C. - The Savannah River Site (SRS) has shut down the massive,

115

Savannah River Site | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Savannah River Site Savannah River Site Savannah River Site | June 2011 Aerial View Savannah River Site | June 2011 Aerial View Savannah River Site (SRS) has mission responsibilities in nuclear weapons stockpile stewardship by ensuring the safe and reliable management of tritium resources; by contributing to the stockpile surveillance program; and by assisting in the development of alternatives for large-scale pit disassembly/conversion capability. SRS also manages excess nuclear materials and supports nuclear nonproliferation initiatives. Environmental stewardship activities include the management, treatment, and disposal of radioactive, hazardous, and mixed wastes. Enforcement April 13, 2010 Consent Order, Parsons Infrastructure & Technology Group, Inc. -

116

Canadian River Compact (Texas) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Canadian River Compact (Texas) Canadian River Compact (Texas) Canadian River Compact (Texas) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Water Buying & Making Electricity Home Weatherization Program Info State Texas Program Type Siting and Permitting Provider Canadian River Compact Commission The Canadian River Commission administers the Canadian River Compact which includes the states of New Mexico, Oklahoma, and Texas. Signed in 1950 by

117

Deep drilling data, Raft River geothermal area, Idaho-Raft River geothermal  

Open Energy Info (EERE)

Deep drilling data, Raft River geothermal area, Idaho-Raft River geothermal Deep drilling data, Raft River geothermal area, Idaho-Raft River geothermal exploration well sidetrack-C Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Report: Deep drilling data, Raft River geothermal area, Idaho-Raft River geothermal exploration well sidetrack-C Details Activities (1) Areas (1) Regions (0) Abstract: Cassia County Idaho; data; geophysical surveys; Idaho; Raft River geothermal area; surveys; United States; USGS; Well No. 3; well-logging Author(s): Covington, H.R. Published: Open-File Report - U. S. Geological Survey, 1/1/1978 Document Number: Unavailable DOI: Unavailable Exploratory Well At Raft River Geothermal Area (1977) Raft River Geothermal Area Retrieved from "http://en.openei.org/w/index.php?title=Deep_drilling_data,_Raft_River_geothermal_area,_Idaho-Raft_River_geothermal_exploration_well_sidetrack-C&oldid=473365"

118

The organizational social context of mental health services and clinician attitudes toward evidence-based practice: A United States national study  

E-Print Network (OSTI)

is that mental health clinic organizational culture andCA: The organizational context of children's mental healthThe organizational social context of mental health services

2012-01-01T23:59:59.000Z

119

Building Bayesian Network Models in Medicine: The MENTOR Experience  

Science Conference Proceedings (OSTI)

An experiment in Bayesian model building from a large medical dataset for Mental Retardation is discussed in this paper. We give a step by step description of the practical aspects of building a Bayesian Network from a dataset. We enumerate and briefly ... Keywords: Bayesian networks, artificial intelligence in medicine, machine learning

Subramani Mani; Marco Valtorta; Suzanne McDermott

2005-03-01T23:59:59.000Z

120

Federal-State Conflicts over the Colorado River  

E-Print Network (OSTI)

A RIVER No MORE: THE COLORADO RIVER AND THE WEST (1981). 3.agricultural use in the Colorado River Basin in California.and California's dispute over Colorado River water, spanning

Kaplan, David

1987-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "river experi mental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Savannah River National Laboratory - Home  

NLE Websites -- All DOE Office Websites

SRNL Logo SRNL and DOE logo art SRNL Logo SRNL and DOE logo art Top Menu Bar SRNL Update: Embassy Fellows Report A report co-authored by Savannah River National Laboratory Senior Advisory Engineer, Dr. Robert Sindelar, has been released. The report to the Government of Japan - Ministry of the Environment provides observations and recommendations on decontamination work and progress... >>MORE Portable Power Research at SRNL Hadron Technologies, Inc., a microwave technology and systems development and manufacturing company with offices in Tennessee and Colorado, has signed a license for a Hybrid Microwave and Off-Gas Treatment System developed by the Savannah River National Laboratory, the Department of Energy's applied science laboratory located at the Savannah River Site. >>MORE

122

Grays River Watershed Geomorphic Analysis  

SciTech Connect

This investigation, completed for the Pacific Northwest National Laboratory (PNNL), is part of the Grays River Watershed and Biological Assessment commissioned by Bonneville Power Administration under project number 2003-013-00 to assess impacts on salmon habitat in the upper Grays River watershed and present recommendations for habitat improvement. This report presents the findings of the geomorphic assessment and is intended to support the overall PNNL project by evaluating the following: The effects of historical and current land use practices on erosion and sedimentation within the channel network The ways in which these effects have influenced the sediment budget of the upper watershed The resulting responses in the main stem Grays River upstream of State Highway 4 The past and future implications for salmon habi

Geist, David R.

2005-04-30T23:59:59.000Z

123

Savannah River Tank Waste Residuals  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah Savannah River Savannah River Tank Waste Residuals HLW Corporate Board November 6, 2008 1 November 6, 2008 Presentation By Sherri R. Ross Department of Energy Savannah River Operations Office The Issue * How clean is clean? * Ultimate Challenge - Justify highly radioactive radionuclides have been removed to the maximum extent practical? 2 removed to the maximum extent practical? - Building compelling regulatory documentation that will withstand intense scrutiny §3116 Requirements 1. Does not require disposal in deep geological repository 2. Highly radioactive radionuclides removed to the maximum extent practical 3. Meet the performance objectives in 10 CFR Part 3 3. Meet the performance objectives in 10 CFR Part 61, Subpart C 4. Waste disposed pursuant to a State-approved closure plan or permit Note: If it is anticipated that Class C disposal limits will be exceeded, additional

124

River Network Routing on the NHDPlus Dataset  

Science Conference Proceedings (OSTI)

The mapped rivers and streams of the contiguous United States are available in a geographic information system (GIS) dataset called National Hydrography Dataset Plus (NHDPlus). This hydrographic dataset has about 3 million river and water body ...

Cdric H. David; David R. Maidment; Guo-Yue Niu; Zong-Liang Yang; Florence Habets; Victor Eijkhout

2011-10-01T23:59:59.000Z

125

Flambeau River Biofuels | Open Energy Information  

Open Energy Info (EERE)

Flambeau River Biofuels Flambeau River Biofuels Jump to: navigation, search Name Flambeau River Biofuels Place Park Falls, Wisconsin Sector Biomass Product A subsidiary of Flambeau River Papers LLC that plans to develop a Fischer Tropsch diesel project in Park Falls, Wisconsin that will process residual wood biomass from forest and agricultural sources. References Flambeau River Biofuels[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Flambeau River Biofuels is a company located in Park Falls, Wisconsin . References ↑ "Flambeau River Biofuels" Retrieved from "http://en.openei.org/w/index.php?title=Flambeau_River_Biofuels&oldid=345407" Categories: Clean Energy Organizations

126

Savannah River Site Environmental Implentation Plan  

SciTech Connect

This report describes the organizational responsibilities for the Savannah River Site Environmental program. Operations, Engineering and projects, Environment, safety, and health, Quality assurance, and the Savannah River Laboratory are described.

1989-08-01T23:59:59.000Z

127

Youghiogheny Wild and Scenic River (Maryland)  

Energy.gov (U.S. Department of Energy (DOE))

Portions of the Youghiogheny River are protected under the Scenic and Wild Rivers Act, and development on or near these areas is restricted. COMAR section 08.15.02 addresses permitted uses and...

128

River Corridor Closure Project Partnering Performance Agreement  

Energy.gov (U.S. Department of Energy (DOE))

WCH and DOE have a mission to complete the clsoure of the Hanford River Corridor by 2015. Early and efficient completion of this work scope law the River Corridor Closure Contract (DE-AC06...

129

A Family By Yellow River  

E-Print Network (OSTI)

River, opposite to Shenxi Province across the River, is within the central zone of Huangtu Plateau Culture in midland China. In history Qikou was a transport hinge connecting Sichuan to the west and Baotou (Inner Mongolia) to the northwest. Still seen... . They own seven mu (a mu is one fifteenth of a hectare) of jujube trees, which is an area expanded on a basis of one mu last year. The labour is tough with a typical droughty climate of Loess Plateau. Shouldering a pole with two buckets at either end...

China Central Television (CCTV)

2005-04-06T23:59:59.000Z

130

Columbia River Component Data Evaluation Summary Report  

Science Conference Proceedings (OSTI)

The purpose of the Columbia River Component Data Compilation and Evaluation task was to compile, review, and evaluate existing information for constituents that may have been released to the Columbia River due to Hanford Site operations. Through this effort an extensive compilation of information pertaining to Hanford Site-related contaminants released to the Columbia River has been completed for almost 965 km of the river.

C.S. Cearlock

2006-08-02T23:59:59.000Z

131

Westinghouse independent safety review of Savannah River production reactors  

Science Conference Proceedings (OSTI)

Westinghouse Electric Corporation has performed a safety assessment of the Savannah River production reactors (K,L, and P) as requested by the US Department of Energy. This assessment was performed between November 1, 1988, and April 1, 1989, under the transition contract for the Westinghouse Savannah River Company's preparations to succeed E.I. du Pont de Nemours Company as the US Department of Energy contractor for the Savannah River Project. The reviewers were drawn from several Westinghouse nuclear energy organizations, embody a combination of commercial and government reactor experience, and have backgrounds covering the range of technologies relevant to assessing nuclear safety. The report presents the rationale from which the overall judgment was drawn and the basis for the committee's opinion on the phased restart strategy proposed by E.I. du Pont de Nemours Company, Westinghouse, and the US Department of Energy-Savannah River. The committee concluded that it could recommend restart of one reactor at partial power upon completion of a list of recommended upgrades both to systems and their supporting analyses and after demonstration that the organization had assimilated the massive changes it will have undergone.

Leggett, W.D.; McShane, W.J. (Westinghouse Hanford Co., Richland, WA (USA)); Liparulo, N.J.; McAdoo, J.D.; Strawbridge, L.E. (Westinghouse Electric Corp., Pittsburgh, PA (USA). Nuclear and Advanced Technology Div.); Toto, G. (Westinghouse Electric Corp., Pittsburgh, PA (USA). Nuclear Services Div.); Fauske, H.K. (Fauske and Associates, Inc., Burr Ridge, IL (USA)); Call, D.W. (Westinghouse Savannah R

1989-04-01T23:59:59.000Z

132

Detecting atmospheric rivers in large climate datasets  

Science Conference Proceedings (OSTI)

Extreme precipitation events on the western coast of North America are often traced to an unusual weather phenomenon known as atmospheric rivers. Although these storms may provide a significant fraction of the total water to the highly managed western ... Keywords: atmospheric rivers, automatic detection of atmospheric rivers, connected component labeling, extreme climate events

Surendra Byna; Prabhat; Michael F. Wehner; Kesheng John Wu

2011-11-01T23:59:59.000Z

133

Smoky Hill and River Valleys  

E-Print Network (OSTI)

.............................................................................3 - 13 Wind Energy and the Meridian Way Wind Farm County. This location is the site of a new wind farm development by Westar Energy, Horizon Wind EnergySmoky Hill and Republican River Valleys Water, Wind, and Economic Development 2008 Field Conference

Peterson, Blake R.

134

Impact of mental representational systems on design interface.  

SciTech Connect

The purpose of the studies conducted at Argonne National Laboratory is to understand the impact mental representational systems have in identifying how user comfort parameters influence how information is to best be presented. By understanding how each individual perceives information based on the three representational systems (visual, auditory and kinesthetic modalities), it has been found that a different approach must be taken in the design of interfaces resulting in an outcome that is much more effective and representative of the users mental model. This paper will present current findings and future theories to be explored.

Brown-VanHoozer, S. A.

1998-02-25T23:59:59.000Z

135

Critical time course of right frontoparietal involvement in mental number space  

Science Conference Proceedings (OSTI)

Neuropsychological, neurophysiological, and neuroimaging studies suggest that right frontoparietal circuits may be necessary for the processing of mental number space, also known as the mental number line MNL. Here we sought to specify the critical time ...

Elena Rusconi; Martynas Dervinis; Frederick Verbruggen; Christopher D. Chambers

2013-03-01T23:59:59.000Z

136

HANFORD SITE RIVER CORRIDOR CLEANUP  

SciTech Connect

In 2005, the US Department of Energy (DOE) launched the third generation of closure contracts, including the River Corridor Closure (RCC) Contract at Hanford. Over the past decade, significant progress has been made on cleaning up the river shore that bordes Hanford. However, the most important cleanup challenges lie ahead. In March 2005, DOE awarded the Hanford River Corridor Closure Contract to Washington Closure Hanford (WCH), a limited liability company owned by Washington Group International, Bechtel National and CH2M HILL. It is a single-purpose company whose goal is to safely and efficiently accelerate cleanup in the 544 km{sup 2} Hanford river corridor and reduce or eliminate future obligations to DOE for maintaining long-term stewardship over the site. The RCC Contract is a cost-plus-incentive-fee closure contract, which incentivizes the contractor to reduce cost and accelerate the schedule. At $1.9 billion and seven years, WCH has accelerated cleaning up Hanford's river corridor significantly compared to the $3.2 billion and 10 years originally estimated by the US Army Corps of Engineers. Predictable funding is one of the key features of the new contract, with funding set by contract at $183 million in fiscal year (FY) 2006 and peaking at $387 million in FY2012. Another feature of the contract allows for Washington Closure to perform up to 40% of the value of the contract and subcontract the balance. One of the major challenges in the next few years will be to identify and qualify sufficient subcontractors to meet the goal.

BAZZELL, K.D.

2006-02-01T23:59:59.000Z

137

Independent Activity Report, Washington River Protection Solutions -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Washington River Protection Solutions Washington River Protection Solutions - September 2010 Independent Activity Report, Washington River Protection Solutions - September 2010 September 2010 Participation in the Washington River Protection Solutions, LLC Integrated Safety Management System Annual Review The U.S. Department of Energy, Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), participated in the review of the Washington River Protection Solutions, LLC Integrated Safety Management System Annual Review for 2010. The review was conducted during the period of August 23 to September 2, 2010, and focused on six functional areas: corrective action management, work planning and control, radiological protection, environmental protection, emergency preparedness, and

138

The implementation research institute: training mental health implementation researchers in the United States  

E-Print Network (OSTI)

contribution to IRI training; administrative support frommethodological, and training challenges. Adm Policy Mentresearch institute: training mental health implementation

2013-01-01T23:59:59.000Z

139

G. A. Antaki Westinghouse Savannah River Company Savannah River Site  

Office of Scientific and Technical Information (OSTI)

W S R C: M S- 9 5 -0 0 0 8 W S R C: M S- 9 5 -0 0 0 8 Analytical Considerations in the Code Qualification of Piping Systems (U) by G. A. Antaki Westinghouse Savannah River Company Savannah River Site Aiken, South Carolina 29808 DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or respnsi- bility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Refer- ence herein to any specific commercial product, process, or service by trade name, trademark,

140

Schlumberger soundings in the Upper Raft River and Raft River Valleys,  

Open Energy Info (EERE)

soundings in the Upper Raft River and Raft River Valleys, soundings in the Upper Raft River and Raft River Valleys, Idaho and Utah Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Report: Schlumberger soundings in the Upper Raft River and Raft River Valleys, Idaho and Utah Details Activities (1) Areas (1) Regions (0) Abstract: In 1975, the U.S. Geological Survey made seventy Schlumberger resistivity soundings in the Upper Raft River Valley and in parts of the Raft River Valley. These soundings complement the seventy-nine soundings made previously in the Raft River Valley (Zohdy and others, 1975) and bring the total number of soundings to 149. This work was done as part of a hydrogeologic study of the area. The location, number, and azimuth of all 149 Schlumberger sounding stations are presented. The location of the new

Note: This page contains sample records for the topic "river experi mental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

An Investigation of User's Mental Models on Website  

Science Conference Proceedings (OSTI)

Since mid 1990s Internet has been developing rapidly to become the most booming and emerging media in recent history and played an important role in human livelihood. People's demands on website interface interaction have thus been increasing. How to ... Keywords: Interactive Qualitative Analysis (IQA), Mental model, website user

Hui-Jiun Hu; Jen Yen

2009-07-01T23:59:59.000Z

142

TRIO experiment  

DOE Green Energy (OSTI)

The TRIO experiment is a test of in-situ tritium recovery and heat transfer performance of a miniaturized solid breeder blanket assembly. The assembly (capsule) was monitored for temperature and neutron flux profiles during irradiation and a sweep gas flowed through the capsule to an anaytical train wherein the amounts of tritium in its various chemical forms were determined. The capsule was designed to operate at different temperatures and sweep gas conditions. At the end of the experiment the amount of tritium retained in the solid was at a concentration of less than 0.1 wppM. More than 99.9% of tritium generated during the experiment was successfully recovered. The results of the experiment showed that the tritium inventories at the beginning and at the end of the experiment follow a relationship which appears to be characteristic of intragranular diffusion.

Clemmer, R.G.; Finn, P.A.; Malecha, R.F.; Misra, B.; Billone, M.C.; Bowers, D.L.; Fischer, A.K.; Greenwood, L.R.; Mattas, R.F.; Tam, S.W.

1984-09-01T23:59:59.000Z

143

Independent Activity Report, Savannah River Operation - June 2010 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Operation - June 2010 Savannah River Operation - June 2010 Independent Activity Report, Savannah River Operation - June 2010 June 2010 Savannah River Operations Office Self-Assessment of the Technical Qualification Program The U.S. Department of Energy (DOE), Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), participated in the DOE Savannah River Operations Office (DOE-SR) self-assessment of the Technical Qualification Program (TQP). Independent Activity Report, Savannah River Operation - June 2010 More Documents & Publications Independent Oversight Review, Savannah River Operations Office - July 2013 Independent Activity Report, Savannah River Remediation - July 2010 2011 Annual Workforce Analysis and Staffing Plan Report - Savannah River

144

Approved Experiments  

NLE Websites -- All DOE Office Websites (Extended Search)

Cycle 31OCT97 Exp Spokesperson Experiment Title Days 666 Clark Magnetic Rotation in 104Sn 5 667 Janssens Unsafe COULEX of the 240Pu Nucleus 3 670 Smith Exotic Structures in very...

145

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Operations Savannah River Operations Office Categorical Exclusion Determinations: Savannah River Operations Office Categorical Exclusion Determinations issued by Savannah River Operations Office. DOCUMENTS AVAILABLE FOR DOWNLOAD September 10, 2013 CX-010669: Categorical Exclusion Determination 484-17D Coal Yard Remediation CX(s) Applied: B6.1 Date: 06/07/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office August 1, 2013 CX-010837: Categorical Exclusion Determination Disassembly, Relocation, and Reassembly of a Metal-framed Quonset Hut CX(s) Applied: B1.22 Date: 08/01/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office August 1, 2013 CX-010836: Categorical Exclusion Determination Subcontractor Roof Repair at 717-12S CX(s) Applied: B1.3

146

The Columbia River System : the Inside Story.  

DOE Green Energy (OSTI)

The Columbia Ricer is one of the greatest natural resources in the western United States. The river and its tributaries touch the lives of nearly every resident of the Northwest-from providing the world-famous Pacific salmon to supplying the clean natural fuel for over 75 percent of the region's electrical generation. Since early in the century, public and private agencies have labored to capture the benefits of this dynamic river. Today, dozens of major water resource projects throughout the region are fed by the waters of the Columbia Basin river system. And through cooperative efforts, the floods that periodically threaten developments near the river can be controlled. This publication presents a detailed explanation of the planning and operation of the multiple-use dams and reservoirs of the Columbia River system. It describes the river system, those who operate and use it, the agreements and policies that guide system operation, and annual planning for multiple-use operation.

United States. Bonneville Power Administration.

1991-09-01T23:59:59.000Z

147

Wing River Wind Farm | Open Energy Information  

Open Energy Info (EERE)

River Wind Farm River Wind Farm Jump to: navigation, search Name Wing River Wind Farm Facility Wing River Wind Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Wing River Wind Farm Developer Wing River Wind Farm Location Hewitt MN Coordinates 46.3254°, -95.0864° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":46.3254,"lon":-95.0864,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

148

DOE to Extend Savannah River Nuclear Solutions Contract at Savannah River  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to Extend Savannah River Nuclear Solutions Contract at Savannah to Extend Savannah River Nuclear Solutions Contract at Savannah River Site to September 2016 DOE to Extend Savannah River Nuclear Solutions Contract at Savannah River Site to September 2016 September 6, 2012 - 12:00pm Addthis Media Contact Bill Taylor 803-952-8564 bill.taylor@srs.gov Aiken, SC -- The Department of Energy's (DOE) Savannah River Operations Office today exercised its option to extend the current Savannah River Site Management and Operating contract with Savannah River Nuclear Solutions, LLC (SRNS) for an additional 38 months, from August 1, 2013 to September 2016. The SRNS contract was competatviely awareded January 10, 2008. The total value of the SRNS contract with the extension is approximately $8 billion. The current contract provides for management and operations of Savannah

149

North Woods River: The St. Croix River in Upper Midwest History  

E-Print Network (OSTI)

>, PhD Student, Department of History, PO Box 6023, BuildingRiver in Upper Midwest History. By McMahon, Eileen M. andRiver in Upper Midwest History. Madison, WI: University of

Karalus, Daniel E

2011-01-01T23:59:59.000Z

150

SAVANNAH RIVER NATIONAL LABORATORY HYDROGEN TECHNOLOGY RESEARCH  

DOE Green Energy (OSTI)

The Savannah River National Laboratory (SRNL) is a U.S. Department of Energy research and development laboratory located at the Savannah River Site (SRS) near Aiken, South Carolina. SRNL has over 50 years of experience in developing and applying hydrogen technology, both through its national defense activities as well as through its recent activities with the DOE Hydrogen Programs. The hydrogen technical staff at SRNL comprises over 90 scientists, engineers and technologists, and it is believed to be the largest such staff in the U.S. SRNL has ongoing R&D initiatives in a variety of hydrogen storage areas, including metal hydrides, complex hydrides, chemical hydrides and carbon nanotubes. SRNL has over 25 years of experience in metal hydrides and solid-state hydrogen storage research, development and demonstration. As part of its defense mission at SRS, SRNL developed, designed, demonstrated and provides ongoing technical support for the largest hydrogen processing facility in the world based on the integrated use of metal hydrides for hydrogen storage, separation, and compression. The SRNL has been active in teaming with academic and industrial partners to advance hydrogen technology. A primary focus of SRNL's R&D has been hydrogen storage using metal and complex hydrides. SRNL and its Hydrogen Technology Research Laboratory have been very successful in leveraging their defense infrastructure, capabilities and investments to help solve this country's energy problems. SRNL has participated in projects to convert public transit and utility vehicles for operation using hydrogen fuel. Two major projects include the H2Fuel Bus and an Industrial Fuel Cell Vehicle (IFCV) also known as the GATOR{trademark}. Both of these projects were funded by DOE and cost shared by industry. These are discussed further in Section 3.0, Demonstration Projects. In addition to metal hydrides technology, the SRNL Hydrogen group has done extensive R&D in other hydrogen technologies, including membrane filters for H2 separation, doped carbon nanotubes, storage vessel design and optimization, chemical hydrides, hydrogen compressors and hydrogen production using nuclear energy. Several of these are discussed further in Section 2, SRNL Hydrogen Research and Development.

Danko, E

2008-02-08T23:59:59.000Z

151

Independent Oversight Activity Report, Savannah River Site -...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Security (HSS) (Reference 1). Meet with the SRS WSB project staff and Savannah River Nuclear Solutions (SRNS) engineers to discuss the proposed corrective actions discussed in...

152

Savannah River Site Waste Solidification Building Corrective...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HIAR SRS-2013-5-07 Site: Savannah River Site Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for the Savannah...

153

from Savannah River Nuclear Solutions, LLC NEWS  

NLE Websites -- All DOE Office Websites (Extended Search)

and communications campaign known as "Safety Begins with Me" led by Savannah River Nuclear Solutions, LLC (SRNS). Banners are flying over roadways, safety-related stories fill...

154

Wild and Scenic Rivers Act (Maryland)  

Energy.gov (U.S. Department of Energy (DOE))

It is state policy to protect the outstanding scenic, geologic, ecologic, historic, recreational, agricultural, fish, wildlife, cultural, and other similar values of certain rivers and adjacent...

155

Savannah River Site, Health Physics Instrument Calibration ...  

Science Conference Proceedings (OSTI)

... Send E-Mail to Laboratory: Savannah River Nuclear Solutions, LLC ... for Alarming Personal Radiation Detection for Homeland Security, Clause 7 ...

2013-09-20T23:59:59.000Z

156

Kings River Conservation Dist | Open Energy Information  

Open Energy Info (EERE)

Kings River Conservation Dist Place California Utility Id 10325 Utility Location Yes Ownership P NERC Location WECC NERC WECC Yes ISO CA Yes Operates Generating Plant Yes Activity...

157

about Savannah River National Laboratory  

nuclear fuel reprocessing, environmental monitoring, and materials science. This experience and knowledge driven environment allows SRNL to be a ...

158

Development, calibration and evaluation of two mathematical models for pollutant transport in a small river  

Science Conference Proceedings (OSTI)

The present research has two main objectives (1) to build two models for concentration prediction in a stream subject to a pollutant release and (2) to investigate options for estimating the parameters of the models. The models rely on the fundamental ... Keywords: Advection-dispersion equation, Dispersion coefficient estimation, Murray Burn, Pollutant transport modelling, River water quality, Tracer experiments, Velocity estimation

Elisabeta-Cristina Ani; Steve Wallis; Andrzej Kraslawski; Paul Serban Agachi

2009-10-01T23:59:59.000Z

159

WASTE INVENTORY DATA AT OAK RIDGEAND SAVANNAH RIVER, IG-0434...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WASTE INVENTORY DATA AT OAK RIDGEAND SAVANNAH RIVER, IG-0434 WASTE INVENTORY DATA AT OAK RIDGEAND SAVANNAH RIVER, IG-0434 The Oak Ridge and Savannah River Operations Offices are...

160

U.S. DEPARTMENT OF ENERGY * SAVANNAH RIVER ...  

NLE Websites -- All DOE Office Websites (Extended Search)

The Savannah River Site and the Savannah River National Laboratory are owned by the U.S. Department of Energy, and are managed and operated by Savannah River Nuclear...

Note: This page contains sample records for the topic "river experi mental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Accelerating Clean-up at Savannah River | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Accelerating Clean-up at Savannah River Accelerating Clean-up at Savannah River Accelerating Clean-up at Savannah River More Documents & Publications Accelerating Clean-up at...

162

Accelerating Clean-up at Savannah River | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Accelerating Clean-up at Savannah River Accelerating Clean-up at Savannah River Accelerating Clean-up at Savannah River More Documents & Publications Project NameDescription Slide...

163

U.S. DEPARTMENT OF ENERGY * SAVANNAH RIVER ...  

NLE Websites -- All DOE Office Websites (Extended Search)

validity of data Patent applied for Savannah River National Laboratory The Savannah River Site and the Savannah River National Laboratory are owned by the U.S. Department of...

164

Water supply analysis for restoring the Colorado River Delta, Mexico  

E-Print Network (OSTI)

Environmental Flows in the Colorado River Delta. Figure 7Cost of Minimum Flows in the Colorado River Delta. Figure 8and Ecological Health on the Colorado River Delta region."

Medellin-Azuara, Josue; Lund, Jay R.; Howitt, Richard E.

2007-01-01T23:59:59.000Z

165

Tritium in the Savannah River Site environment  

Science Conference Proceedings (OSTI)

Tritium is released to the environment from many of the operations at the Savannah River Site. The releases from each facility to the atmosphere and to the soil and streams, both from normal operations and inadvertent releases, over the period of operation from the early 1950s through 1988 are presented. The fate of the tritium released is evaluated through environmental monitoring, special studies, and modeling. It is concluded that approximately 91% of the tritium remaining after decay is now in the oceans. A dose and risk assessment to the population around the site is presented. It is concluded that about 0.6 fatal cancers may be associated with the tritium released during all the years of operation to the population of about 625,000. This same population (based on the overall US cancer statistics) is expected to experience about 105,000 cancer fatalities from all types of cancer. Therefore, it is considered unlikely that a relationship between any of the cancer deaths occurring in this population and releases of tritium from the SRS will be found.

Murphy, C.E. Jr.; Bauer, L.R.; Hayes, D.W.; Marter, W.L.; Zeigler, C.C.; Stephenson, D.E.; Hoel, D.D.; Hamby, D.M.

1991-05-01T23:59:59.000Z

166

Experience with Palladium Diffusers in Tritium Processing  

DOE Green Energy (OSTI)

Hydrogen isotopes are separated from other gases by permeation through palladium and palladium-silver alloy diffusers in the Tritium Facilities at the US Department of Energy Savannah River Site (SRS). Diffusers have provided effective service for almost forty years. This paper is an overview of the operational experience with the various diffuser types that have been employed at SRS. Alternative technologies being developed at SRS for purifying hydrogen isotopes are also discussed.

Motyka, T.; Clark, E.A.; Dauchess, D.A.; Heung, L.K.; Rabum, R.L.

1995-01-27T23:59:59.000Z

167

PIA - Savannah River Operations Office Executive Commitment Action...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Executive Commitment Action Tracking System PIA - Savannah River Operations Office Executive Commitment Action Tracking System PIA - Savannah River Operations Office Executive...

168

PIA - Savannah River Operations Office Executive Commitment Action...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PIA - Savannah River Operations Office Executive Commitment Action Tracking System PIA - Savannah River Operations Office Executive Commitment Action Tracking System PIA - Savannah...

169

PIA - Savannah River Nuclear Solution SRNS ProRad Environment...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SRNS ProRad Environment Management PIA - Savannah River Nuclear Solution SRNS ProRad Environment Management PIA - Savannah River Nuclear Solution SRNS ProRad Environment Management...

170

Department of Energy Cites Savannah River Nuclear Solutions,...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Nuclear Solutions, LLC for Worker Safety and Health Violations Department of Energy Cites Savannah River Nuclear Solutions, LLC for Worker Safety and Health...

171

Raft River monitor well potentiometric head responses and water...  

Open Energy Info (EERE)

River site was initiated in 1974 by the IDWR. This effort consisted of semiannual chemical sampling of 22 irrigation wells near the Raft River geothermal development area. This...

172

New River Geothermal Research Project, Imperial Valley, California...  

Open Energy Info (EERE)

New River Geothermal Research Project, Imperial Valley, California Geothermal Project Jump to: navigation, search Last modified on July 22, 2011. Project Title New River Geothermal...

173

Trona Injection Tests: Mirant Potomac River Station, Unit 1,...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Trona Injection Tests: Mirant Potomac River Station, Unit 1, November 12 to December 23, 2005, Summary Report Trona Injection Tests: Mirant Potomac River Station, Unit 1, November...

174

DOE - Office of Legacy Management -- Elk River Reactor - MN 01  

Office of Legacy Management (LM)

Elk River Reactor - MN 01 FUSRAP Considered Sites Site: Elk River Reactor (MN.01 ) Eliminated from consideration under FUSRAP - Reactor was dismantled and decommissioned by 1974...

175

PIA - Savannah River Nuclear Solutions Training Records and Informatio...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Training Records and Information Network (TRAIN) PIA - Savannah River Nuclear Solutions Training Records and Information Network (TRAIN) PIA - Savannah River Nuclear Solutions...

176

PIA - Savannah River Nuclear Solutions Training Records and Informatio...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PIA - Savannah River Nuclear Solutions Training Records and Information Network (TRAIN) PIA - Savannah River Nuclear Solutions Training Records and Information Network (TRAIN) PIA...

177

Savannah River's Biomass Steam Plant Success with Clean and Renewable...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River's Biomass Steam Plant Success with Clean and Renewable Energy Savannah River's Biomass Steam Plant Success with Clean and Renewable Energy In order to meet the...

178

Savannah River's Biomass Steam Plant Success with Clean and Renewable...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

River's Biomass Steam Plant Success with Clean and Renewable Energy Savannah River's Biomass Steam Plant Success with Clean and Renewable Energy In order to meet the federal energy...

179

Consolidation of Surplus Plutonium at Savannah River Site | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waste Management Nuclear Materials & Waste Consolidation of Surplus Plutonium at Savannah River Site Consolidation of Surplus Plutonium at Savannah River Site Waste...

180

DOE Selects Washington River Protection Solutions, LLC for Tank...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Washington River Protection Solutions, LLC for Tank Operations Contract at Hanford Site DOE Selects Washington River Protection Solutions, LLC for Tank Operations Contract at...

Note: This page contains sample records for the topic "river experi mental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

EA-1969: Clark Fork River Delta Restoration Project, Bonner County...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1969: Clark Fork River Delta Restoration Project, Bonner County, Idaho EA-1969: Clark Fork River Delta Restoration Project, Bonner County, Idaho Summary Bonneville Power...

182

Independent Oversight Review, Savannah River Site Salt Waste...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Salt Waste Processing Facility - August 2013 Independent Oversight Review, Savannah River Site Salt Waste Processing Facility - August 2013 August 2013 Review...

183

Principal Media Contact: DT Townsend Savannah River Nuclear Solutions...  

NLE Websites -- All DOE Office Websites (Extended Search)

Central Savannah River Area that have previously participated in the DOE Savannah River Science Bowl academic competition. These students have a demonstrated interest and...

184

Savannah River National Laboratory Meets with Historically Black...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River National Laboratory Meets with Historically Black Colleges and Universities Savannah River National Laboratory Meets with Historically Black Colleges and...

185

2013 Annual Planning Summary for the Savannah River Operations...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 Annual Planning Summary for the Savannah River Operations Office 2013 Annual Planning Summary for the Savannah River Operations Office 2013 Annual Planning Summary for the...

186

2013 Annual Planning Summary for the Office of River Protection...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

River Protection and Richland Operations Office 2013 Annual Planning Summary for the Office of River Protection and Richland Operations Office 2013 Annual Planning Summary for the...

187

2013 Annual Planning Summary for the Savannah River Operations...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2013 Annual Planning Summary for the Savannah River Operations Office 2013 Annual Planning Summary for the Savannah River Operations Office 2013 Annual Planning Summary for the...

188

Refraction Survey At Snake River Plain Region (DOE GTP) | Open...  

Open Energy Info (EERE)

Refraction Survey At Snake River Plain Region (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Refraction Survey At Snake River Plain...

189

Magnetotellurics At New River Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Magnetotellurics At New River Area (DOE GTP) Exploration Activity Details Location New River Area Exploration Technique Magnetotellurics Activity Date Usefulness not indicated...

190

Ground Gravity Survey At Snake River Plain Region (DOE GTP) ...  

Open Energy Info (EERE)

Snake River Plain Region (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity Survey At Snake River Plain Region (DOE GTP)...

191

Geothermometry At New River Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Geothermometry At New River Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geothermometry At New River Area (DOE GTP) Exploration...

192

Inspection of Savannah River Operations Office Managementof Emergency...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Operations Office Managementof Emergency Response and Law Enforcement-Related Grants, IG-0604 Inspection of Savannah River Operations Office Managementof Emergency...

193

EIS-0037: Springfield City Utilities, James River Generating...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

37: Springfield City Utilities, James River Generating Station, Power Plants 3 and 4, Springfield, Greene County, Missouri EIS-0037: Springfield City Utilities, James River...

194

Belle Fourche River Compact (South Dakota) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Other Agencies You are here Home Savings Belle Fourche River Compact (South Dakota) Belle Fourche River Compact (South Dakota) Eligibility Agricultural...

195

CRAD, Emergency Management - Office of River Protection K Basin...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Emergency Management - Office of River Protection K Basin Sludge Waste System CRAD, Emergency Management - Office of River Protection K Basin Sludge Waste System May 2004 A section...

196

Understanding Uncertainties in Future Colorado River Streamflow  

Science Conference Proceedings (OSTI)

The Colorado River is the primary water source for more than 30 million people in the U.S. and Mexico. Recent studies that project streamflow changes in the Colorado River all project annual declines, but the magnitude of the projected decreases range ...

Julie A. Vano; Bradley Udall; Daniel R. Cayan; Jonathan T. Overpeck; Levi D. Brekke; Tapash Das; Holly C. Hartmann; Hugo G. Hidalgo; Martin Hoerling; Gregory J. McCabe; Kiyomi Morino; Robert S. Webb; Kevin Werner; Dennis P. Lettenmaier

197

Savannah River Site Environmental Report for 1998  

Science Conference Proceedings (OSTI)

The mission at the Savannah River Site (SRS) is focused primarily on support of the national defense, nonproliferation, and environmental cleanup. SRS-through its prime operating contractor, Westinghouse Savannah River Company-continues to maintain a comprehensive environmental monitoring program.

Arnett, M.

1999-06-09T23:59:59.000Z

198

Powder River 0 20 40 KILOMETERS  

E-Print Network (OSTI)

1 Monitoring Coal Bed Methane Production: A Case Study from the Powder River Basin, Wyoming, United The growing significance of the Powder River Basin's Coal Bed Methane (CBM) to United States domestic energy% of gas mostly methane, hence the name Coal Bed Methane (CBM). The types of coal, in increasing order

199

American Eel in the Susquehanna River  

Science Conference Proceedings (OSTI)

This report reviews and synthesizes factors affecting the potential benefits and adverse consequences of providing upstream passage for the American eel at hydroelectric facilities on the main stem of the Susquehanna River and other rivers on the Atlantic and Gulf Coasts of North America.

2011-09-26T23:59:59.000Z

200

Willamette River Habitat Protection and Restoration Program  

E-Print Network (OSTI)

.............................................................................6 a. The Challenge of Restoration in a Large River/Flood Plain System.............6 b. The Need Goals: Anchor Habitats as Stepping Stones....................20 f. Measuring Results-purpose dams and reservoirs as part of the Federal Columbia River Power System, as well as 42 miles of bank

Note: This page contains sample records for the topic "river experi mental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

EIS-0082-S2: Savannah River Site Salt Processing, Savannah River Site,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

082-S2: Savannah River Site Salt Processing, Savannah River 082-S2: Savannah River Site Salt Processing, Savannah River Site, Aiken, South Carolina EIS-0082-S2: Savannah River Site Salt Processing, Savannah River Site, Aiken, South Carolina SUMMARY This SEIS evaluates the potential environmental impacts of alternatives for separating the high-activity fraction from the low-activity fraction of the high-level radioactive waste salt solutions now stored in underground tanks at the Savannah River Site (SRS) near Aiken, South Carolina. The high-activity fraction of the high-level waste (HLW) salt solution would then be vitrified in the Defense Waste Processing Facility (DWPF) and stored until it could be disposed of as HLW in a geologic repository. The low activity fraction would be disposed of as low-level waste (saltstone)

202

Environmental flow for Monsoon Rivers in India: The Yamuna River as a case study  

E-Print Network (OSTI)

We consider the flows of Monsoon Rivers in India that will permit the river to perform all its natural functions. About 80% of the total flow for Indian rivers is during the monsoon and the remaining 20% is during the non monsoon period. By carrying out a case study of the river Yamuna in Delhi we find that at least 50% of the virgin monsoon (July to September) flow is required for the transport of the full spectrum of soil particles in the river sediment. A similar flow is needed for adequate recharge of the floodplain aquifers along river. For the non monsoon period (October to June) about 60% of the virgin flow is necessary to avoid the growth of still water algae and to support river biodiversity.

Soni, Vikram; Singh, Diwan

2013-01-01T23:59:59.000Z

203

SANE experiment  

SciTech Connect

The Spin Asymmetries of the Nucleon Experiment (SANE) is a measurement of parallel and near-perpendicular double spin asymmetries in an inclusive electron scattering. The main goal of the experiment was to measure A{sub {parallel}} and A{sub 80} and extract the spin asymmetries of the proton A{sub 1}{sup p}, A{sub 2}{sup p} and spin structure functions g{sub 1}{sup p} and g{sub 2}{sup p}. Using the Thomas Jefferson National Accelerator Facility's polarized electron beam and the University of Virginia's polarized frozen ammonia ({sup 14}NH{sub 3}) target in Hall C, the experiment ran in 2009, collecting data in a Q{sup 2} region from 2.5 to 6.5 GeV{sup 2} and between Bjorken x of 0.3 to 0.8. Particle detection was accomplished using the Big Electron Telescope Array (BETA), a novel non-magnetic detector. This talk will address the progress of the analysis designed to extract the proton spin asymmetries and structure functions. Preliminary results will be presented.

H. Baghdasaryan, SANE Collaboration

2012-04-01T23:59:59.000Z

204

Results of short-term corrosion evaluation tests at Raft River  

DOE Green Energy (OSTI)

Four categories of short-term materials evaluation tests were conducted in geothermal fluid from Raft River Geothermal Experiment, Well No. 1, to obtain corrosion data relevant to the design of the Raft River Thermal Loop Facility. Test programs are described and the testing philosophies are discussed. All materials and configurations which were tested are identified and details of posttest visual examinations are presented. The materials are then assigned to appropriate performance categories on the basis of test behavior, and the possible service limitations are appraised.

Miller, R.L.

1977-10-01T23:59:59.000Z

205

What Predicts Recovery Orientation in County Departments of Mental Health? A Pilot Study  

E-Print Network (OSTI)

H. (2003). Does organizational culture in?uence health careOrganizational measurement and the implementation of innovations in mental healthmental health care each have distinctive organizational

Brown, Timothy T.; Mahoney, Christine B.; Adams, Neal; Felton, Mistique; Pareja, Candy

2010-01-01T23:59:59.000Z

206

Exposure to, perceptions and levels of mental skills among tertiary institution field hockey players / Maryke Eloff.  

E-Print Network (OSTI)

??The importance of mental skills training (MST) is emphasized by previous/available research findings which show that by combining MST with physical training it enhances players (more)

Eloff, Maryke

2010-01-01T23:59:59.000Z

207

The Effect of Placement Change on Foster Children's Utilization of Emergency Mental Health Services  

E-Print Network (OSTI)

C. R. (2008). Children's mental health emergencies- part2: Emergency department evaluation and treatment of childrenhealth disorders. Pediatric Emergency Care, 24(7), Barth, R.

Fawley-King, Kya

2010-01-01T23:59:59.000Z

208

Ichthyoplankton entrainment study at the SRS Savannah River water intakes for Westinghouse Savannah River Company  

SciTech Connect

Cooling water for L and K Reactors and makeup water for Par Pond is pumped from the Savannah River at the 1G, 3G, and 5G pump houses. Ichthyoplankton (drifting fish larvae and eggs) from the river are entrained into the reactor cooling systems with the river water and passed through the reactor's heat exchangers where temperatures may reach 70[degrees]C during full power operation. Ichthyoplankton mortality under such conditions is assumed to be 100 percent. The number of ichthyoplankton entrained into the cooling system depends on a variety of variables, including time of year, density and distribution of ichthyoplankton in the river, discharge levels in the river, and the volume of water withdrawn by the pumps. Entrainment at the 1 G pump house, which is immediately downstream from the confluence of Upper Three Runs Creek and the Savannah River, is also influenced by discharge rates and ichthyoplankton densities in Upper Three Runs Creek. Because of the anticipated restart of several SRS reactors and the growing concern surrounding striped bass and American shad stocks in the Savannah River, the Department of Energy requested that the Environmental Sciences Section (ESS) of the Savannah River Laboratory sample ichthyoplankton at the SRS Savannah River intakes. Dams Moore, Inc., under a contract with Westinghouse Savannah River Company performed the sampling and data analysis for the ESS.

Paller, M. (Westinghouse Savannah River Co., Aiken, SC (United States))

1992-03-26T23:59:59.000Z

209

Effects of irrigation on crops and soils with Raft River geothermal water  

DOE Green Energy (OSTI)

The Raft River Irrigation Experiment investigated the suitability of using energy-expended geothermal water for irrigation of selected field-grown crops. Crop and soil behavior on plots sprinkled or surface irrigated with geothermal water was compared to crop and soil behavior on plots receiving water from shallow irrigation wells and the Raft River. In addition, selected crops were produced, using both geothermal irrigation water and special management techniques. Crops irrigated with geothermal water exhibited growth rates, yields, and nutritional values similar to comparison crops. Cereal grains and surface-irrigated forage crops did not exhibit elevated fluoride levels or accumulations of heavy metals. However, forage crops sprinkled with geothermal water did accumulate fluorides, and leaching experiments indicate that new soils receiving geothermal water may experience increased salinity, exchangeable sodium, and decreased permeability. Soil productivity may be maintained by leaching irrigations.

Stanley, N.E.; Schmitt, R.C.

1980-01-01T23:59:59.000Z

210

Rapid River Hatchery - Spring Chinook, Final Report  

SciTech Connect

This report presents the findings of the independent audit of the Rapid River Hatchery (Spring Chinook). The hatchery is located in the lower Snake River basin near Riggins Idaho. The hatchery is used for adult collection, egg incubation, and rearing of spring chinook. The audit was conducted in April 1996 as part of a two-year effort that will include 67 hatcheries and satellite facilities located on the Columbia and Snake River system in Idaho, Oregon, and Washington. The hatchery operating agencies include the US Fish and Wildlife Service, Idaho Department of Fish and Game, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife.

Watson, M.

1996-05-01T23:59:59.000Z

211

Independent Oversight Review, Savannah River Operations Office- August 2013  

Energy.gov (U.S. Department of Energy (DOE))

Review of the Savannah River Site Salt Waste Processing Facility Safety Basis and Design Development.

212

Iteratively constructive sequential design of experiments and surveys with nonlinear parameter-data relationships  

E-Print Network (OSTI)

uncer- tainties are related [Atkinson and Donev, 1992; Box and Lucas, 1959; Silvey, 1980]. [5] Let et al., 1995] and classical nonlinear design methods [Atkinson and Donev, 1992; Box and Lucas, 1959 nonlinear estimate for the quality of an experi- mental design can be used [Atkinson and Donev, 1992; Box

213

Kootenai River Ecosystem Finding of No Significant Impact (FONSI)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Kootenai River Ecosystem Kootenai River Ecosystem Finding of No Significant Impact (FONSI) June 2005 1 Department of Energy BONNEVILLE POWER ADMINISTRATION Kootenai River Ecosystem Project Finding of No Significant Impact (FONSI) Summary: Bonneville Power Administration (BPA) is proposing to fund the Kootenai River Ecosystem Project. With this funding the Kootenai Tribe of Idaho (KTOI) and Idaho Fish and Game (IDFG) would add liquid nitrogen and phosphorus to the Kootenai River from late June through September for up to five years to replace nutrients lost to the hydrosystem. The goal of this project is to help enhance native fish populations and river health. The nutrients are expected to stimulate production in the Kootenai River's

214

Ohio River Ecological Research Program (ORERP): 2007 Ohio River Monitoring Results  

Science Conference Proceedings (OSTI)

The Ohio River Ecological Research Program (ORERP) is the largest collaborative power plant research program in the world. This report presents the results of the 2007 ORERP fish population sampling near 10 Ohio River power plants that covered nearly the entire (1,000 mile) length of the river. The sampling program consisted of adult/juvenile fish, habitat, and water quality field studies conducted upstream and downstream of the participating power plants.

2009-10-20T23:59:59.000Z

215

Ohio River Ecological Research Program (ORERP): 011 Ohio River Monitoring Results  

Science Conference Proceedings (OSTI)

The 2011 Ohio River Ecological Research Program (ORERP) consisted of adult and juvenile fish surveys, habitat evaluations, and water quality studies that were conducted upstream and downstream of 11 participating power plants that cover nearly 600 river miles. The principal research objectives of this study were to evaluate possible effects of thermal effluents on the temporal and spatial distributions of juvenile and adult fish in the Ohio River and to investigate associations with hydrological, ...

2013-09-05T23:59:59.000Z

216

Ohio River Ecological Research Program (ORERP): 2010 Ohio River Monitoring Results  

Science Conference Proceedings (OSTI)

The 2010 Ohio River Ecological Research Program (ORERP) consisted of adult and juvenile fish surveys, habitat evaluations, and water quality studies conducted upstream and downstream of 11 participating power plants that cover nearly 600 river miles. The principal research objectives of this study were to evaluate possible effects of thermal effluents on the temporal and spatial distributions of juvenile and adult fish in the Ohio River, and to investigate associations with hydrological, water ...

2012-10-12T23:59:59.000Z

217

Ohio River Ecological Research Program (ORERP): 2006 Ohio River Monitoring Results  

Science Conference Proceedings (OSTI)

The Ohio River Ecological Research Program (ORERP) is the largest collaborative power plant research program in the world. This report presents the results of the 2006 ORERP fish population sampling near 12 Ohio River power plants that covered nearly the entire (1000 mile) length of the river. The sampling program consisted of adult/juvenile fish, habitat, and water quality field studies upstream and downstream of the participating power plants.

2008-10-13T23:59:59.000Z

218

Ohio River Ecological Research Program (ORERP): 2005 Ohio River Monitoring Results  

Science Conference Proceedings (OSTI)

The Ohio River Ecological Research Program (ORERP) is the largest collaborative power plant research program in the world. This report presents the results of the 2005 ORERP fish population sampling near the Ohio River power stations. In 2005, the program consisted of adult/juvenile fish, habitat, and water quality field studies near 17 electric generating stations that covered nearly the entire (~1000 mile) length of the river.

2007-12-17T23:59:59.000Z

219

Savannah River Remediation Intern Sees Nuclear Industry as Job Opportunity  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Remediation Intern Sees Nuclear Industry as Job Savannah River Remediation Intern Sees Nuclear Industry as Job Opportunity Savannah River Remediation Intern Sees Nuclear Industry as Job Opportunity July 9, 2012 - 10:00am Addthis Spencer Isom, second year engineering intern for Savannah River Remediation (SRR) and fourth summer at Savannah River Site (SRS), performs a standard equipment check at Saltstone Production Facility. | Photo courtesy of Savannah River Site Spencer Isom, second year engineering intern for Savannah River Remediation (SRR) and fourth summer at Savannah River Site (SRS), performs a standard equipment check at Saltstone Production Facility. | Photo courtesy of Savannah River Site Maddie M. Blair Public Affairs Intern, Savannah River Remediation Why does she keep coming back? "There are so many fascinating processes, people, and work

220

Savannah River Remediation Intern Sees Nuclear Industry as Job Opportunity  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Remediation Intern Sees Nuclear Industry as Job Savannah River Remediation Intern Sees Nuclear Industry as Job Opportunity Savannah River Remediation Intern Sees Nuclear Industry as Job Opportunity July 9, 2012 - 10:00am Addthis Spencer Isom, second year engineering intern for Savannah River Remediation (SRR) and fourth summer at Savannah River Site (SRS), performs a standard equipment check at Saltstone Production Facility. | Photo courtesy of Savannah River Site Spencer Isom, second year engineering intern for Savannah River Remediation (SRR) and fourth summer at Savannah River Site (SRS), performs a standard equipment check at Saltstone Production Facility. | Photo courtesy of Savannah River Site Maddie M. Blair Public Affairs Intern, Savannah River Remediation Why does she keep coming back? "There are so many fascinating processes, people, and work

Note: This page contains sample records for the topic "river experi mental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Oversight Reports - Savannah River Site | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Savannah River Site Oversight Reports - Savannah River Site September 4, 2013 Independent Oversight Review, Savannah River Site Salt Waste Processing Facility - August 2013 Review of the Savannah River Site Salt Waste Processing Facility Safety Basis and Design Development. August 5, 2013 Independent Oversight Review, Savannah River Operations Office - July 2013 Review of the Employee Concerns Program at the Savannah River Operations Office July 25, 2013 Independent Oversight Activity Report, Savannah River Site Waste Solidification Building Savannah River Site Waste Solidification Building Corrective Actions from the January 2013 Report on Construction Quality of Mechanical Systems Installation and Fire Protection Design [HIAR SRS-2013-5-07] April 22, 2013 Independent Activity Report, Savannah River Site - March 2013

222

EIS-0241: Hood River Fisheries Program | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Hood River Fisheries Program 1: Hood River Fisheries Program EIS-0241: Hood River Fisheries Program SUMMARY This EIS evaluates a BPA proposal to protect and improve anadromous salmonid populations in the Hood River Basin. These actions are proposed in an attempt to mitigate the losses of fish and wildlife associated with the construction and operation of Federal hydro-power facilities in the Columbia River Basin. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD December 4, 2008 EIS-0241-SA-02: Supplement Analysis for the Hood River Fisheries Project Supplement Analysis for the Hood River Fisheries Project May 16, 2005 EIS-0241-SA-01: Supplement Analysis for the Hood River Fisheries Project, Hood River County, Oregon Supplement Analysis for the Hood River Fisheries Project

223

WABASH RIVER COAL GASIFICATION REPOWERING PROJECT  

Science Conference Proceedings (OSTI)

The close of 1999 marked the completion of the Demonstration Period of the Wabash River Coal Gasification Repowering Project. This Final Report summarizes the engineering and construction phases and details the learning experiences from the first four years of commercial operation that made up the Demonstration Period under Department of Energy (DOE) Cooperative Agreement DE-FC21-92MC29310. This 262 MWe project is a joint venture of Global Energy Inc. (Global acquired Destec Energy's gasification assets from Dynegy in 1999) and PSI Energy, a part of Cinergy Corp. The Joint Venture was formed to participate in the Department of Energy's Clean Coal Technology (CCT) program and to demonstrate coal gasification repowering of an existing generating unit impacted by the Clean Air Act Amendments. The participants jointly developed, separately designed, constructed, own, and are now operating an integrated coal gasification combined-cycle power plant, using Global Energy's E-Gas{trademark} technology (E-Gas{trademark} is the name given to the former Destec technology developed by Dow, Destec, and Dynegy). The E-Gas{trademark} process is integrated with a new General Electric 7FA combustion turbine generator and a heat recovery steam generator in the repowering of a 1950's-vintage Westinghouse steam turbine generator using some pre-existing coal handling facilities, interconnections, and other auxiliaries. The gasification facility utilizes local high sulfur coals (up to 5.9% sulfur) and produces synthetic gas (syngas), sulfur and slag by-products. The Project has the distinction of being the largest single train coal gasification combined-cycle plant in the Western Hemisphere and is the cleanest coal-fired plant of any type in the world. The Project was the first of the CCT integrated gasification combined-cycle (IGCC) projects to achieve commercial operation.

Unknown

2000-09-01T23:59:59.000Z

224

Production of benthic macroinvertebrates in a river used for commercial navigation :Kanawha River, West Virginia.  

E-Print Network (OSTI)

?? The purpose of this study was to analyze the production of the benthic macroinvertebrates in a commercially navigated river in order to assess the (more)

Layton, Raymond Jay

2009-01-01T23:59:59.000Z

225

Evaluating Cumulative Ecosystem Evaluating Cumulative Ecosystem Response of the Columbia River Response of the Columbia River  

E-Print Network (OSTI)

Fish ­ presence, abundance, res. time, diet, growth rate, fitness Exchange ­ plant biomass, TOC, NOAA Fisheries, Hammond, OR Northwest Power and Conservation Council Columbia River Estuary Science

226

The NOvA Experiment: Status and Outlook  

E-Print Network (OSTI)

The NOvA long-baseline neutrino oscillation experiment is currently under construction and will use an upgraded NuMI neutrino source at Fermilab and a 14-kton detector at Ash River, Minnesota to explore the neutrino sector. NOvA uses a highly active, finely segmented detector design that offers superb event identification capability, allowing precision measurements of \

R. B. Patterson; for the NOvA Collaboration

2012-09-04T23:59:59.000Z

227

River Data Package for the 2004 Composite Analysis  

Science Conference Proceedings (OSTI)

Beginning in fiscal year 2003, the DOE Richland Operations Office initiated activities, including the development of data packages, to support the 2004 Composite Analysis. The river data package provides calculations of flow and transport in the Columbia River system. This document presents the data assembled to run the river module components for the section of the Columbia River from Vernita Bridge to the confluence with the Yakima River.

Rakowski, Cynthia L.; Guensch, Gregory R.; Patton, Gregory W.

2004-08-01T23:59:59.000Z

228

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 27, 2012 June 27, 2012 CX-008614: Categorical Exclusion Determination Repair Culvert on Road 3 CX(s) Applied: B1.3 Date: 06/27/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office June 27, 2012 CX-008613: Categorical Exclusion Determination Replace Awning, Building 735-A CX(s) Applied: B1.3 Date: 06/27/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office June 26, 2012 CX-008618: Categorical Exclusion Determination Evaluation of Sorbent/Ion Exchangers for Radiochemical and Metal Separations CX(s) Applied: B3.6 Date: 06/26/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office June 26, 2012 CX-008617: Categorical Exclusion Determination Savannah River National Laboratory Building 735-13A Power Addition CX(s) Applied: B1.15

229

Predicting the Discharge of Global Rivers  

Science Conference Proceedings (OSTI)

The ability to simulate coupled energy and water fluxes over large continental river basins, in particular streamflow, was largely nonexistent a decade ago. Since then, macroscale hydrological models (MHMs) have been developed, which predict such ...

Bart Nijssen; Greg M. O'Donnell; Dennis P. Lettenmaier; Dag Lohmann; Eric F. Wood

2001-08-01T23:59:59.000Z

230

DuPage River Project - Student Page  

NLE Websites -- All DOE Office Websites (Extended Search)

Mini Lessons You will chose from a list of mini-lessons designed to teach you the skills you need to conduct river monitoring, care and raise smallmouth bass, maintain...

231

Savannah River Site Environmental Report for 1997  

Science Conference Proceedings (OSTI)

The mission at the Savannah River Site has changed from the production of nuclear weapons materials for national defense to the management of waste, restoration of the environment, and the development of industry in and around the site.

Arnett, M.W.; Mamatey, A.R. [eds.

1998-08-01T23:59:59.000Z

232

River Falls Municipal Utilities - Business Energy Efficiency...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Will match Focus on Energy incentive to 5,000 Commercial Central AC Tune-Up: 50 LED Exit Signs: Free Installation River Falls Municipal Utility (RFMU) offers a variety of...

233

Elk River Wind Farm | Open Energy Information  

Open Energy Info (EERE)

River Wind Farm River Wind Farm Jump to: navigation, search Name Elk River Wind Farm Facility Elk River Wind Farm Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner PPM Energy Inc Developer PPM Energy Inc Energy Purchaser Empire District Electric Co. Location Butler County KS Coordinates 37.586575°, -96.547093° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.586575,"lon":-96.547093,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

234

Three Rivers Electric Coop | Open Energy Information  

Open Energy Info (EERE)

Rivers Electric Coop Rivers Electric Coop Jump to: navigation, search Name Three Rivers Electric Coop Place Missouri Utility Id 16751 Utility Location Yes Ownership C NERC Location SERC NERC SERC Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Outdoor Lighting HPS 100 W Lighting Outdoor Lighting HPS 100 W w/Metal Pole Lighting Residential Residential Average Rates Residential: $0.0926/kWh Commercial: $0.0791/kWh Industrial: $0.0688/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=Three_Rivers_Electric_Coop&oldid=411667"

235

North Sky River | Open Energy Information  

Open Energy Info (EERE)

Sky River Sky River Jump to: navigation, search Name North Sky River Facility North Sky River Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner NextEra Energy Resources Developer NextEra Energy Resources Energy Purchaser Pacific Gas & Electric Location Tehachapi CA Coordinates 35.335578°, -118.186347° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.335578,"lon":-118.186347,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

236

New River Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

New River Geothermal Area New River Geothermal Area (Redirected from New River Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: New River Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (13) 10 References Area Overview Geothermal Area Profile Location: California Exploration Region: Gulf of California Rift Zone GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed.

237

The Des Plaines River -- Part Two  

NLE Websites -- All DOE Office Websites (Extended Search)

a canal through the Chicago Portage, down the Des Plaines valley, and thence to LaSalle-Peru where the Illinois River became navigable in all seasons. The Northwest Territory...

238

Relating River Plume Structure to Vertical Mixing  

Science Conference Proceedings (OSTI)

The structure of a river plume is related to the vertical mixing using an isohaline-based coordinate system. Salinity coordinates offer the advantage of translating with the plume as it moves or expanding as the plume grows. This coordinate ...

Robert D. Hetland

2005-09-01T23:59:59.000Z

239

First Savannah River Shipment Arrives At WIPP  

NLE Websites -- All DOE Office Websites (Extended Search)

First Savannah River Site Shipment Arrives At WIPP CARLSBAD, N.M., May 10, 2001 - The U.S. Department of Energy's (DOE) Carlsbad Field Office today announced that the first...

240

Contractor Fee Payments- Savannah River Site Office  

Energy.gov (U.S. Department of Energy (DOE))

See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Savannah River Site Office on these charts.

Note: This page contains sample records for the topic "river experi mental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Lance Lab Research | Savannah River Ecology Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

from a Cu study On the Savannah River Site we have access to several areas with coal fly ash contamination. We also are looking at the effects of coal combustion wastes on...

242

Think water : reconditioning the Malden River  

E-Print Network (OSTI)

The purpose of this thesis is to link water, history and culture through architectural and urban design by researching the potential for the rejuvenation of a neglected industrial site at the edge of a river. The Malden ...

Oda, Kazuyo, 1969-

2003-01-01T23:59:59.000Z

243

Raft River geoscience case study: appendixes  

DOE Green Energy (OSTI)

The following are included in these appendices: lithology, x-ray analysis, and cores; well construction data; borehole geophysical logs; chemical analyses from wells at the Raft River geothermal site; and bibliography. (MHR)

Dolenc, M.R.; Hull, L.C.; Mizell, S.A.; Russell, B.F.; Skiba, P.A.; Strawn, J.A.; Tullis, J.A.

1981-11-01T23:59:59.000Z

244

Flint River Drought Protection Act (Georgia)  

Energy.gov (U.S. Department of Energy (DOE))

The purpose of the Flint River Drought Protection Act is to maintain in-stream flow in times of drought by providing incentives for farmers to take acres out of irrigation. It allows Environmental...

245

Radionuclide transport in the Yenisei River  

E-Print Network (OSTI)

Data characterizing the pollution of the Yenisei River (water and bottom sediment) by radionuclide resulting from the use of the river water for cooling industrial reactors in the Mining-Chemical Complex are presented. Studies have been made of the contamination of the river during the period when reactors with direct flow cooling were used and after these were shut down. Distinctive features of the migration of radionuclide in the Yenisei are noted, in particular, their distribution between the solid and liquid phases. The amounts of 137Cs, 65Zn, 60Co, 54Mn, and 152Eu in the channel are determined from the effluent discharge site to Dudinka port. The rate of continuous self removal of 137Cs is estimated to be 0.19 1/year, corresponding to a half purification time of 3.6 years for a 600 km long segment of the river bed.

S. M. Vakulovsky; E. G. Tertyshnik; A. I. Kabanov

2012-11-15T23:59:59.000Z

246

Probabilistic Quantitative Precipitation Forecasts for River Basins  

Science Conference Proceedings (OSTI)

A methodology has been formulated to aid a field forecaster in preparing probabilistic quantitative precipitation forecasts (QPFs) for river basins. The format of probabilistic QPF is designed to meet three requirements: (i) it is compatible with ...

Roman Krzysztofowicz; William J. Drzal; Theresa Rossi Drake; James C. Weyman; Louis A. Giordano

1993-12-01T23:59:59.000Z

247

Sky River Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Sky River Wind Farm Sky River Wind Farm Jump to: navigation, search Name Sky River Wind Farm Facility Sky River Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner NextEra Energy Resources Developer Zond Systems Energy Purchaser Southern California Edison Co Location Tehachapi CA Coordinates 35.07665°, -118.25529° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.07665,"lon":-118.25529,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

248

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 24, 2011 February 24, 2011 CX-005504: Categorical Exclusion Determination Analytical Methods for Radiochemical Measurements CX(s) Applied: B3.6 Date: 02/24/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office February 24, 2011 CX-005503: Categorical Exclusion Determination Drain Line Replacement West of 735-A CX(s) Applied: B1.3 Date: 02/24/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office February 24, 2011 CX-005502: Categorical Exclusion Determination Implement Savannah River National Laboratory Defense Nuclear Facilities Safety Board 2004-2 Gap Closure Activity CX(s) Applied: B2.3 Date: 02/24/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office

249

Columbia River Component Data Gap Analysis  

SciTech Connect

This Data Gap Analysis report documents the results of a study conducted by Washington Closure Hanford (WCH) to compile and reivew the currently available surface water and sediment data for the Columbia River near and downstream of the Hanford Site. This Data Gap Analysis study was conducted to review the adequacy of the existing surface water and sediment data set from the Columbia River, with specific reference to the use of the data in future site characterization and screening level risk assessments.

L. C. Hulstrom

2007-10-23T23:59:59.000Z

250

Ohio River Basin Trading Project Listening Workshops  

Science Conference Proceedings (OSTI)

In March 2010, American Farmland Trust held two listening workshops in the Wabash River Watershed to provide information and collect feedback on the Ohio River Basin Trading Project. Each session began with a basic primer on water quality trading given by Jim Klang of Kieser Associates. The presentations were followed by facilitated discussions. Participants were prompted with several questions, developed from earlier listening sessions, addressing issues that producers will likely face in water quality ...

2010-09-15T23:59:59.000Z

251

Monitoring of mental workload levels during an everyday life office-work scenario  

Science Conference Proceedings (OSTI)

Personal and ubiquitous healthcare applications offer new opportunities to prevent long-term health damage due to increased mental workload by continuously monitoring physiological signs related to prolonged high workload and providing just-in-time feedback. ... Keywords: Heart rate variability, Mental workload, Office-work, Personal and ubiquitous healthcare, Stress

Burcu Cinaz; Bert Arnrich; Roberto Marca; Gerhard Trster

2013-02-01T23:59:59.000Z

252

Mixing psychology and HCI in evaluation of augmented reality mental health technology  

Science Conference Proceedings (OSTI)

Recent studies present Augmented Reality Exposure Therapy (ARET) as a potentially effective technology in the Mental Health (MH) field. This study evaluates the ARET system applied to treatment of cockroach phobia in a clinical setting. The results seem ... Keywords: augmented reality, mental health, small animal phobia

Maja Wrzesien; Jean-Marie Burkhardt; Mariano Alcaiz Raya; Cristina Botella

2011-05-01T23:59:59.000Z

253

Raft River Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Raft River Geothermal Area Raft River Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Raft River Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 DOE Involvement 4 Timeline 5 Regulatory and Environmental Issues 6 Future Plans 7 Raft River Unit II (26 MW) and Raft River Unit III (32 MW) 8 Enhanced Geothermal System Demonstration 9 Exploration History 10 Well Field Description 11 Technical Problems and Solutions 12 Geology of the Area 12.1 Regional Setting 12.2 Structure 12.3 Stratigraphy 12.3.1 Raft River Formation 12.3.2 Salt Lake Formation 12.3.3 Precambrian Rocks 13 Hydrothermal System 14 Heat Source 15 Geofluid Geochemistry 16 NEPA-Related Analyses (1) 17 Exploration Activities (77) 18 References Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":6,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"300px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.10166667,"lon":-113.38,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

254

Snake River Basin environmental program  

DOE Green Energy (OSTI)

The Snake River Basin Environmental Program was designed to evaluate existing environmental data with respect to potential geothermal development in eight Known Geothermal Resource Areas (KGRAs) in Idaho. State and federal agencies, public interest groups, consulting groups, and universities participated in the DOE program. Final reports for the program are intended to be utilized as reference documents and planning tools for future environmental studies. Evaluation of the data indicated that the majority of the existing data base is adequate for small-scale direct-use developments. The potential impacts of development on water quality and water supply are the primary environmental concern. Preliminary data suggest that subsidence and induced seismicity may be a problem in several of the KGRAs. Sensitive animal species and habitats have been identified in each area; development in the Castle Creek KGRA may be restricted due to the Birds of Prey Natural Area. Two workshops provided public input on concerns and land use planning for geothermal development in Idaho. Based on the data evaluation and public input, a plan for supplementing the existing environmental data base was prepared.

Spencer, S.G.; Sullivan, J.F.

1979-09-01T23:59:59.000Z

255

Indian River Hydroelectric Project Grant  

Science Conference Proceedings (OSTI)

This Final Technical Report provides a concise retrospective and summary of all facets of the Sheldon Jackson College electrical Infrastructure Renovation portion of the Indian River Hydroelectric Project Grant of the City and Borough of Sitka, Alaska. The Project Overview describes the origins of the project, the original conditions that provided the impetus for the grant funding, how the grant amendment was developed, the conceptual design development, and the actual parameters of the final project as it went out to bid. The Project Overview also describes the ''before and after'' conditions of the project. The Objectives division of this Final Technical Report describes the amendment-funded goals of the project. It also describes the milestones of project development and implementation, as well as, the rationale behind the milestone array. The Description of Activities Performed division of this report provides an in-depth chronological analysis of progressive project implementation. Photographs will provide further illustration of particular functional aspects of the renovation project within project parameters. The Conclusions and Recommendations division of this report provides a comprehensive retrospective analysis of the project.

Rebecca Garrett

2005-04-29T23:59:59.000Z

256

Geochemical modeling at Raft River  

DOE Green Energy (OSTI)

Chemical analysis of water from three depth regimes at the Raft River KGRA indicate the presence of at least two distinct hydrothermal fluids. One fluid predominates in the fracture system on the west side of the valley, known as the Bridge Fault. This fluid is characterized by low conductivity (2,000 to 3,000 ..mu..s) and 6 to 9 ..mu..g/ml F/sup -/. The second fluid, encountered in the center of the valley, appears to be associated with the Narrows Structure and is characterized by a conductivity of 6,000 to 11,000 ..mu..s and F/sup -/ of 3 to 6 ..mu..g/ml. Contour mapping of conductivity and Cl/sup -//F/sup -/ ratios indicates upwelling of both deep geothermal fluids into the shallow system. This recharge into the intermediate and shallow zones produces high-conductivity water which is used for irrigation. Application of a simple mixing model shows that all the water sampled in intermediate and deep zones can be described by mixtures of two nearly pure fluids. One mechanism, consistent with the known data, is deep upwelling of a highly mineralized fluid which is heated by the basement rock and then penetrates sediment layers through fractures. The second fluid is relatively recent meteoric water conductively heated by the basement rock.

Allen, C.A.; Chaney, R.E.; McAtee, R.E.

1979-01-01T23:59:59.000Z

257

Minimally-invasive Wearable Sensors and Data Processing Methods for Mental Stress Detection  

E-Print Network (OSTI)

Chronic stress is endemic to modern society. If we could monitor our mental state, we may be able to develop insights about how we respond to stress. However, it is unfeasible to continuously annotate stress levels all the time. In the studies conducted for this dissertation, a minimally-invasive wearable sensor platform and physiological data processing methods were developed to analyze a number of physiological correlates of mental stress. We present a minimally obtrusive wearable sensor system that incorporates embedded and wireless communication technologies. The system is designed such that it provides a balance between data collection and user comfort. The system records the following stress related physiological and contextual variables: heart rate variability (HRV), respiratory activity, electrodermal activity (EDA), electromyography (EMG), body acceleration, and geographical location. We assume that if the respiratory influences on HRV can be removed, the residual HRV will be more salient to stress in comparison with raw HRV. We develop three signal processing methods to separate HRV into a respiration influenced and residual HRV. The first method consists of estimating respiration-induced portion of HRV using a linear system identification method (autoregressive moving average model with exogenous inputs). The second method consists of decomposing HRV into respiration-induced principal dynamic mode and residual using nonlinear dynamics decomposition method (principal dynamic mode analysis). The third method consists of splitting HRV into respiration-induced power spectrum and residual in frequency domain using spectral weighting method. These methods were validated on a binary discrimination problem of two psychophysiological conditions: mental stress and relaxation. The linear system identification method, nonlinear dynamics decomposition method, and spectral weighting method classified stress and relaxation conditions at 85.2 %, 89.2 %, and 81.5 % respectively. When tonic and phasic EDA features were combined with the linear system identification method, the nonlinear dynamics decomposition method, and the spectral weighting method, the average classification rates were increased to 90.4 %, 93.2 %, and 88.1 % respectively. To evaluate the developed wearable sensors and signal processing methods on multiple subjects, we performed case studies. In the first study, we performed experiments in a laboratory setting. We used the wearable sensors and signal processing methods to discriminate between stress and relaxation conditions. We achieved 81 % average classification rate in the first case study. In the second study, we performed experiments to detect stress in ambulatory settings. We collected data from the subjects who wore the sensors during regular daily activities. Relaxation and stress conditions were allocated during daily activities. We achieved a 72 % average classification rate in ambulatory settings. Together, the results show achievements in recognizing stress from wearable sensors in constrained and ambulatory conditions. The best results for stress detection were achieved by removing respiratory influence from HRV and combining features from EDA.

Choi, Jongyoon

2011-12-01T23:59:59.000Z

258

Precipitation Features Observed by Doppler Radar at Tuktoyaktuk, Northwest Territories, Canada, during the Beaufort and Arctic Storms Experiment  

Science Conference Proceedings (OSTI)

In the fall of 1994, the Beaufort and Arctic Storms Experiment (BASE) was held to collect information on the structure and evolution of mesoscale weather systems over the southern Beaufort Sea and the Mackenzie River delta of the western Canadian ...

Yoshio Asuma; Soshi Iwata; Katsuhiro Kikuchi; G. W. Kent Moore; Ryuji Kimura; Kazuhisa Tsuboki

1998-09-01T23:59:59.000Z

259

An Assessment of Lower Snake River Hydrosystem Alternatives on Survival and Recovery of Snake River Salmonids  

E-Print Network (OSTI)

River, New Jersey: Prentice-Hall. Palmer, T. 1991. The Snake River: Window to the West. Washington, DC in the American West. Seattle, Washington: University of Washington Press. Goble, D.D., and P.W. Hirt (editors). 1999. Northwest Lands, Northwest Peoples: Readings in Environmental History. Seattle, Washington

260

Commercial integration and partnering at Savannah River Site  

Science Conference Proceedings (OSTI)

Savannah River Site (SRS), particularly the Savannah River Technology Center (SRTC) with the experience from the first successful Integrated Technology Demonstration, can provide an excellent foundation for meeting DOE-EM`s objectives with the new DOE-EM five focus area approach. With this in mind, SRTC established an activity to pursue full commercialization of environmental technologies. This report is an assessment of the status of commercialization at SRS and provides recommendations for enhancement as well as some tools critical to implementation. A review was made of the current situation at SRS with regards to taking technology development to commercial fruition. This was done from the perspective of comparing it to known commercialization models and processes. It was found that SRTC already works through many of the steps in these processes. With integration and action-oriented efforts of the inclusion of business and market factors, SRTC could become an aggressive, successful developer of commercialized technologies. Commercial success criteria tools were developed with regards to integrating them with SRTC selection criteria to ensure that all critical factors are covered in technology commercialization project evaluations. Private investors are very clear that their interest lies in funding commercial enterprises, not merely technologies. Mobilizing private capital is critical to real job growth and long-term economic development. Also, potential industry partners were identified that are willing to be involved with SRS` technology applications and regional development efforts. As another important component to success, regional support organizations were reviewed and evaluated.

Steele, J.R. [Westinghouse Savannah River Co., Aiken, SC (United States); Babione, R.A.; Shikashio, L.A.; Wacaster, A.J.; Paterson, A.D. [SCIENTECH, Inc., Idaho Falls, ID (United States)

1994-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "river experi mental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

MENTAL POLICY ACT IMPLE- MENTING PROCEDURES Subpart A-General  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 Department of Energy § 1021.102 PART 1021-NATIONAL ENVIRON- MENTAL POLICY ACT IMPLE- MENTING PROCEDURES Subpart A-General Sec. 1021.100 Purpose. 1021.101 Policy. 1021.102 Applicability. 1021.103 Adoption of CEQ NEPA regulations. 1021.104 Definitions. 1021.105 Oversight of Agency NEPA activi- ties. Subpart B-DOE Decisionmaking 1021.200 DOE planning. 1021.210 DOE decisionmaking. 1021.211 Interim actions: Limitations on ac- tions during the NEPA process. 1021.212 Research, development, demonstra- tion, and testing. 1021.213 Rulemaking. 1021.214 Adjudicatory proceedings. 1021.215 Applicant process. 1021.216 Procurement, financial assistance, and joint ventures. Subpart C-Implementing Procedures 1021.300 General requirements. 1021.301 Agency review and public participa-

262

Great River Energy (28 Member Cooperatives) - Commercial and Industrial  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Great River Energy (28 Member Cooperatives) - Commercial and Great River Energy (28 Member Cooperatives) - Commercial and Industrial Efficiency Rebates Great River Energy (28 Member Cooperatives) - Commercial and Industrial Efficiency Rebates < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Tribal Government Savings Category Heating & Cooling Commercial Heating & Cooling Heating Cooling Appliances & Electronics Heat Pumps Commercial Lighting Lighting Manufacturing Water Heating Program Info Funding Source Great River Energy State Minnesota Program Type Utility Rebate Program Rebate Amount Varies by measure and member cooperative offering. Provider Great River Energy Great River Energy, a generation and transmission cooperative which serves

263

Independent Oversight Follow-up Review, Savannah River National Laboratory  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River National Savannah River National Laboratory - January 2012 Independent Oversight Follow-up Review, Savannah River National Laboratory - January 2012 January 2012 Follow-up Review of Implementation Verification Reviews at the Savannah River National Laboratory Savannah River Site The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent review of the identification and implementation of safety basis hazard controls associated with "flashing spray release" and supporting information documented in the Savannah River National Laboratory (SRNL) WSRC-SA-2, SRNL Technical Area Documented Safety Analysis, Revision 10; WSRC-TS-97-00014, SRNL Technical Area Technical Safety Requirements,

264

Singing River Electric Power Association - Comfort Advantage Home Program |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Singing River Electric Power Association - Comfort Advantage Home Singing River Electric Power Association - Comfort Advantage Home Program Singing River Electric Power Association - Comfort Advantage Home Program < Back Eligibility Residential Savings Category Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Heat Pumps Program Info State Mississippi Program Type Utility Rebate Program Rebate Amount Contact Singing River Electric Power Association Provider Singing River Electric Power Association Singing River Electric Power Association provides rebates on energy efficiency measures in new homes and heat pumps that meet [http://www.comfortadvantage.com/Comfort%20Advantage%20brochure.pdf Comfort Advantage] weatherization standards. To qualify for this rebate the home

265

Interstate Commission on the Potomac River Basin (Multiple States) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interstate Commission on the Potomac River Basin (Multiple States) Interstate Commission on the Potomac River Basin (Multiple States) Interstate Commission on the Potomac River Basin (Multiple States) < Back Eligibility Commercial Construction Industrial Investor-Owned Utility Local Government Municipal/Public Utility Rural Electric Cooperative Systems Integrator Tribal Government Utility Savings Category Water Buying & Making Electricity Home Weatherization Program Info State District of Columbia Program Type Environmental Regulations Siting and Permitting Provider Interstate Commission on the Potomac River Basin The Interstate Commission on the Potomac River Basin's (ICPRB) mission is to enhance, protect, and conserve the water and associated land resources of the Potomac River and its tributaries through regional and interstate

266

Coho Salmon Master Plan, Clearwater River Basin.  

DOE Green Energy (OSTI)

The Nez Perce Tribe has a desire and a goal to reintroduce and restore coho salmon to the Clearwater River Subbasin at levels of abundance and productivity sufficient to support sustainable runs and annual harvest. Consistent with the Clearwater Subbasin Plan (EcoVista 2003), the Nez Perce Tribe envisions developing an annual escapement of 14,000 coho salmon to the Clearwater River Subbasin. In 1994, the Nez Perce Tribe began coho reintroduction by securing eggs through U.S. v. Oregon; by 1998 this agreement provided an annual transfer of 550,000 coho salmon smolts from lower Columbia River hatchery facilities for release in the Clearwater River Subbasin. In 1998, the Northwest Power and Conservation Council authorized the Bonneville Power Administration to fund the development of a Master Plan to guide this reintroduction effort. This Master Plan describes the results of experimental releases of coho salmon in the Clearwater River Subbasin, which have been ongoing since 1995. These data are combined with results of recent coho reintroduction efforts by the Yakama Nation, general coho life history information, and historical information regarding the distribution and life history of Snake River coho salmon. This information is used to assess a number of alternative strategies aimed at restoring coho salmon to historical habitats in the Clearwater River subbasin. These data suggest that there is a high probability that coho salmon can be restored to the Clearwater River subbasin. In addition, the data also suggest that the re-establishment of coho salmon could be substantially aided by: (1) the construction of low-tech acclimation facilities; (2) the establishment of a 'localized' stock of coho salmon; and (3) the construction of hatchery facilities to provide a source of juvenile coho salmon for future supplementation activities. The Nez Perce Tribe recognizes that there are factors which may limit the success of coho reintroduction. As a result of these uncertainties, the Nez Perce Tribe proposes to utilize a phased approach for coho reintroductions. This Master Plan seeks authorization and funding to move forward to Step 2 in the Northwest Power and Conservation Council 3-Step review process to further evaluate Phase I of the coho reintroduction program, which would focus on the establishment of a localized coho salmon stock capable of enduring the migration to the Clearwater River subbasin. To achieve this goal, the Nez Perce Tribe proposes to utilize space at existing Clearwater River subbasin hatchery facilities in concert with the construction of two low-tech acclimation facilities, to capitalize on the higher survival observed for acclimated versus direct stream released coho. In addition, Phase I would document the natural productivity of localized coho salmon released in two targeted tributaries within the Clearwater River subbasin. If Phase I is successful at establishing a localized coho salmon stock in an abundance capable of filling existing hatchery space, the rates of natural productivity are promising, and the interspecific interactions between coho and sympatric resident and anadromous salmonids are deemed acceptable, then Phase II would be triggered. Phase II of the coho reintroduction plan would focus on establishing natural production in a number of Clearwater River subbasin tributaries. To accomplish this goal, Phase II would utilize existing Clearwater River subbasin hatchery facilities, and expand facilities at the Nez Perce Tribal Hatchery Site 1705 facility to rear approximately 687,700 smolts annually for use in a rotating supplementation schedule. In short, this document identifies a proposed alternative (Phase I), complete with estimates of capital, operations and maintenance, monitoring and evaluation, and permitting that is anticipated to raise average smolt replacement rates from 0.73 (current) to 1.14 using primarily existing facilities, with a limited capital investment for low-tech acclimation facilities. This increase in survival is expected to provide the opportunity for the establishm

Nez Perce Tribe; FishPro

2004-10-01T23:59:59.000Z

267

River Hydrokinetic Resource Atlas | Open Energy Information  

Open Energy Info (EERE)

River Hydrokinetic Resource Atlas River Hydrokinetic Resource Atlas Jump to: navigation, search Tool Summary LAUNCH TOOL Name: River Hydrokinetic Resource Atlas Agency/Company /Organization: National Renewable Energy Laboratory Sector: Energy Focus Area: Water Power Resource Type: Maps, Software/modeling tools User Interface: Website Website: maps.nrel.gov/river_atlas Country: United States Web Application Link: maps.nrel.gov/river_atlas Cost: Free UN Region: Northern America Coordinates: 39.7412019515°, -105.172290802° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.7412019515,"lon":-105.172290802,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

268

Three Mile Island-1, Crystal River-3, and Davis-Besse Fuel Crud Observations Assessment and Root Cause  

Science Conference Proceedings (OSTI)

This report shares information pertaining to elevated crud observed on fuel at Babcock Wilcox (BW) plants Crystal River-3, Davis-Besse, and Three Mile Island-1 and the subsequent causal investigation performed by AREVA, Inc. Discussion of industry operating experience, effects of crud, fuel inspection results, and preventive and corrective actions in future operating cycles are also included.

2011-10-26T23:59:59.000Z

269

ARM - Field Campaign - Ganges Valley Aerosol Experiment (GVAX)  

NLE Websites -- All DOE Office Websites (Extended Search)

govCampaignsGanges Valley Aerosol Experiment (GVAX) govCampaignsGanges Valley Aerosol Experiment (GVAX) Campaign Links Science Plan AMF India Deployment Website Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send Campaign : Ganges Valley Aerosol Experiment (GVAX) 2011.06.13 - 2012.03.31 Website : http://www.arm.gov/sites/amf/pgh/ Lead Scientist : V. Rao Kotamarthi Description The Ganges valley region is one of the largest and most rapidly developing sections of the Indian subcontinent. The Ganges River, which provides the region with water needed for sustaining life, is fed primarily by snow and rainfall associated with Indian summer monsoon. Impacts of changes in precipitation patterns, temperature, and the flow of the snow-fed rivers could be immense. Recent satellite-based measurements have indicated that

270

HyTech - The Hydrogen Technology Laboratory at Savannah River  

DOE Green Energy (OSTI)

SRS recently announced the formation of the Hydrogen Technology Laboratory (HyTech) to work with industry and government in developing technologies based on the site`s four decades of experience with tritium and other forms of H. HyTech will continue to sustain the site`s ongoing role in H technology applications for defense programs. In addition, the laboratory will work with the chemical, transportation, power, medical, and other industries to develop and test related technologies. HyTech, which is located in the Savannah River Technology Center, will make use of its facilities and staff, as well as the infrastructure within the site`s Tritium Facilities. More than 80 SRS scientists, engineers, and technical professionals with backgrounds in chemistry, engineering, materials science, metallurgy, physics, and computer science will work with the laboratory. This paper describes some of HyTech`s current initiatives in the area of H storage, transportation, and energy applications.

Motyka, T.; Knight, J.R.; Heung, L.K.; Lee, M.W.

1995-12-31T23:59:59.000Z

271

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 20, 2012 July 20, 2012 CX-009070: Categorical Exclusion Determination A-Area Alternate Fire Water Supply CX(s) Applied: B1.3 Date: 07/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office July 20, 2012 CX-009069: Categorical Exclusion Determination Remove and Dispose of 107 A & B Tanks and Support Structure CX(s) Applied: B6.1 Date: 07/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office July 20, 2012 CX-009068: Categorical Exclusion Determination Hydrogen Charging Tritium Contaminated Metals CX(s) Applied: B3.6 Date: 07/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office July 16, 2012 CX-009077: Categorical Exclusion Determination F-Area Infrasturcture Improvement CX(s) Applied: B1.23 Date: 07/16/2012

272

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 30, 2012 August 30, 2012 CX-009100: Categorical Exclusion Determination Cooling Tower Water Sampling and Analysis for Legionella Pneumophila Density CX(s) Applied: B3.6 Date: 08/30/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office August 29, 2012 CX-009106: Categorical Exclusion Determination Dismantle/Remove Vacuum System and Related Equipment in 772-F CX(s) Applied: B1.3 Date: 08/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office August 29, 2012 CX-009105: Categorical Exclusion Determination 284-H Track Coal Hopper Pit Modifications CX(s) Applied: B1.28 Date: 08/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office August 29, 2012 CX-009104: Categorical Exclusion Determination Infrastructure Modification for the Mobile Plutonium Facility (MPF) at the

273

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2012 9, 2012 CX-008639: Categorical Exclusion Determination Establish Laydown Yard East of 281-3F CX(s) Applied: B1.15 Date: 05/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office May 29, 2012 CX-008638: Categorical Exclusion Determination Excavate to Repair Underground Domestic Water Leak between Tanks 5 and 7 CX(s) Applied: B1.3 Date: 05/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office May 29, 2012 CX-008637: Categorical Exclusion Determination Operation and Maintenance of Inductively Coupled Plasma Mass Spectrometry Method in 773, B142 CX(s) Applied: B3.6 Date: 05/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office May 29, 2012 CX-008636: Categorical Exclusion Determination Analysis of Organic Species by Gas Chromatography (GC) and Gas

274

Raft River Geothermal Facility | Open Energy Information  

Open Energy Info (EERE)

GEOTHERMAL ENERGYGeothermal Home GEOTHERMAL ENERGYGeothermal Home Raft River Geothermal Facility General Information Name Raft River Geothermal Facility Facility Raft River Sector Geothermal energy Location Information Location Cassia County, Idaho Coordinates 42.358036°, -113.5728501° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.358036,"lon":-113.5728501,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

275

Office of River Protection (Hanford) - Enforcement Documents  

NLE Websites -- All DOE Office Websites (Extended Search)

Enforcement Documents Enforcement Documents Office of River Protection (Hanford) Enforcement Letter issued to Washington River Protection Solutions, LLC, related to a positive Unreviewed Safety Question involving the Tank Farm Waste Transfer System at the Hanford Site, (NEL-2012-01) February 28, 2012 Consent Order issued to Washington River Protection Solutions, LLC related to deficiencies in the corrective action management program, radiation control program, and sealed radioactive source accountability and control program (NCO-2011-01) May 27, 2011 Consent Order issued to Bechtel National, Inc. for Deficiencies in Vendor Commercial Grade Dedication Processes at the Hanford Waste Treatment and Immobilization Plant Project (NCO-2010-03) September 22, 2010 Preliminary Notice of Violation issued to Bechtel National, Inc., related to Deficiencies at the Waste Treatment and Immobilization Plant at the Hanford Site, December 3, 2008 (NEA-2008-04)

276

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 20, 2013 June 20, 2013 CX-010655: Categorical Exclusion Determination Roof Repair on Crane Maintenance Area Roof CX(s) Applied: B1.3 Date: 06/20/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office June 18, 2013 CX-010657: Categorical Exclusion Determination Western Sector Treatment System Soil Vapor Extraction Wells CX(s) Applied: B3.1 Date: 06/18/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office June 18, 2013 CX-010656: Categorical Exclusion Determination Stormwater Drainage Repair CX(s) Applied: B1.3 Date: 06/18/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office June 17, 2013 CX-010662: Categorical Exclusion Determination Reroute Diesel Water Cooling Line at 241-125H CX(s) Applied: B1.3 Date: 06/17/2013

277

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 21, 2013 May 21, 2013 CX-010489: Categorical Exclusion Determination Salt Batch 7 Qualification CX(s) Applied: B3.6 Date: 05/21/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office May 14, 2013 CX-010497: Categorical Exclusion Determination Electrical Operations to Perform Yard Maintenance in Electrical Substations CX(s) Applied: B1.3 Date: 05/14/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office May 14, 2013 CX-010496: Categorical Exclusion Determination Corrosion Tests on Carbon Steel Exposed to Oxalic Acid and a Sludge Simulant CX(s) Applied: B3.6 Date: 05/14/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office May 14, 2013 CX-010495: Categorical Exclusion Determination Advanced Fuel Cycle Initiative (AFCI) Am/Cm Separations

278

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 10, 2010 March 10, 2010 CX-001373: Categorical Exclusion Determination Analytical Development Tritium Support Laboratory for Mass Spectroscopy, Infrared Spectroscopy, and Raman CX(s) Applied: B3.6 Date: 03/10/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office March 10, 2010 CX-001372: Categorical Exclusion Determination On-Dock Rail Straddle Portal Prototype Project, Y580 CX(s) Applied: B3.6 Date: 03/10/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office March 4, 2010 CX-001129: Categorical Exclusion Determination Cut and Cap Firewater Line Tap-Off Near 714-7N CX(s) Applied: B1.3 Date: 03/04/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office

279

Arkansas River Power Authority | Open Energy Information  

Open Energy Info (EERE)

River Power Authority River Power Authority Jump to: navigation, search Name Arkansas River Power Authority Place Colorado Website www.arpapower.org/ Utility Id 712 Utility Location Yes Ownership P NERC Location WECC NERC WECC Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes Activity Wholesale Marketing Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates No Rates Available References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a"

280

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 20, 2011 July 20, 2011 CX-006620: Categorical Exclusion Determination Relocate Hydroburst System from 238-H to 234-7H CX(s) Applied: B1.31 Date: 07/20/2011 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office July 18, 2011 CX-006619: Categorical Exclusion Determination Install Seventeen Monitoring Wells Around 715-D CX(s) Applied: B3.1 Date: 07/18/2011 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office July 18, 2011 CX-006618: Categorical Exclusion Determination Disable F-Tank Farm (FTF) Air Compressor Sequencer CX(s) Applied: B1.3 Date: 07/18/2011 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office July 18, 2011 CX-006617: Categorical Exclusion Determination E Area Fire Water Extension CX(s) Applied: B1.15

Note: This page contains sample records for the topic "river experi mental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 17, 2012 January 17, 2012 CX-007642: Categorical Exclusion Determination Parking Lot Construction North of Pad 717-14F CX(s) Applied: B1.15 Date: 01/17/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office January 4, 2012 CX-007646: Categorical Exclusion Determination Insulation removal work in F-Tank Farm CX(s) Applied: B1.3 Date: 01/04/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office January 4, 2012 CX-007645: Categorical Exclusion Determination Nonproliferation Technology Section - Nanomaterials Research CX(s) Applied: B3.6 Date: 01/04/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office December 29, 2011 CX-007650: Categorical Exclusion Determination Control Room Consolidation CX(s) Applied: B2.2

282

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 16, 2010 April 16, 2010 CX-002207: Categorical Exclusion Determination Thin Films for Whisker Growth CX(s) Applied: B3.6 Date: 04/16/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office April 16, 2010 CX-002206: Categorical Exclusion Determination Real-Waste Testing of Enhanced Chemical Cleaning for Sludge Heel Removal CX(s) Applied: B3.6 Date: 04/16/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office April 16, 2010 CX-002208: Categorical Exclusion Determination Monitor Instruments Mass Spectrometer at Aiken County Technology Laboratory CX(s) Applied: B3.6 Date: 04/16/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office

283

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 1, 2012 November 1, 2012 CX-009620: Categorical Exclusion Determination Next Generation Solvent (NGS) Real Waste Testing CX(s) Applied: B3.6 Date: 11/01/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office October 31, 2012 CX-009624: Categorical Exclusion Determination High Activity Waste Trailer (HAWT) Disposition CX(s) Applied: B3.1 Date: 10/31/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office October 31, 2012 CX-009623: Categorical Exclusion Determination Technetium Precipitation Batch Testing CX(s) Applied: B3.6 Date: 10/31/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office October 25, 2012 CX-009625: Categorical Exclusion Determination Preparation and Temperature-Time Settling Treatment of Rheology Samples

284

Savannah River Site | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Site | National Nuclear Security Administration Site | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Our Locations > Savannah River Site Savannah River Site http://www.srs.gov/general/srs-home.html Field Office: Located south of Aiken, South Carolina, the Savannah River Field Office (SRFO) is responsible for the NNSA Defense Program missions at

285

Red River Biodiesel Ltd | Open Energy Information  

Open Energy Info (EERE)

River Biodiesel, Ltd. River Biodiesel, Ltd. Place Houston, Texas Zip 77006 Product Red River operates a biodiesel plant in Houstion, Texas with a capacity of 56.85mLpa (15m gallons per year). Coordinates 29.76045°, -95.369784° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":29.76045,"lon":-95.369784,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

286

Savannah River Site Waste Disposition Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Terrel J. Spears Terrel J. Spears Assistant Manager Waste Disposition Project DOE Savannah River Operations Office Savannah River Site Savannah River Site Waste Disposition Project Waste Disposition Project 2 Waste Disposition Project - Mission Radioactive Liquid Waste - Tank Waste Stabilization and Disposition - Disposition 36 million gallons of radioactive liquid waste - Close 49 underground storage tanks in which the waste now resides 3 36.7 Million 33.7 Mgal (92%) 3.0 Mgal (8%) Saltcake Sludge Salt Supernate Volume Curies 397 Million Curies (MCi) 212 MCi (54%) 185 MCi (46%) Gallons (Mgal) 36.5 Million 33.5 Mgal (92%) 3.0 Mgal (8%) Liquid Waste Background Liquid Waste Background * 2 tanks closed * 49 tanks remaining to close - aging, carbon steel - 27 compliant, 22 non-compliant - 12 have known leak sites

287

Withlacoochee River Elec Coop | Open Energy Information  

Open Energy Info (EERE)

Withlacoochee River Elec Coop Withlacoochee River Elec Coop Jump to: navigation, search Name Withlacoochee River Elec Coop Place Florida Utility Id 20885 Utility Location Yes Ownership C NERC Location FRCC NERC FRCC Yes Activity Distribution Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png General Service Demand Commercial General Service Non-Demand Commercial Residential Service Residential Average Rates Residential: $0.1170/kWh Commercial: $0.0976/kWh Industrial: $0.0880/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a"

288

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 20, 2011 June 20, 2011 CX-006372: Categorical Exclusion Determination Well Installations at R-Area Operable Unit CX(s) Applied: B3.1 Date: 06/20/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office June 15, 2011 CX-006373: Categorical Exclusion Determination Connect 735-11A to the Central Plant Chilled Water System CX(s) Applied: B1.3 Date: 06/15/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office June 14, 2011 CX-006375: Categorical Exclusion Determination Replace Transfer Lines with Spare Lines CX(s) Applied: B1.3 Date: 06/14/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office June 14, 2011 CX-006374: Categorical Exclusion Determination

289

Cemex River Plant | Open Energy Information  

Open Energy Info (EERE)

Plant Plant Jump to: navigation, search Name Cemex River Plant Facility Cemex River Plant Sector Wind energy Facility Type Community Wind Facility Status In Service Owner Foundation Windpower Developer Foundation Windpower Energy Purchaser Cemex River Plant Location Victorville CA Coordinates 34.55527517°, -117.3012614° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":34.55527517,"lon":-117.3012614,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

290

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 29, 2012 November 29, 2012 CX-009607: Categorical Exclusion Determination 772-F Low-Activity Drain (LAD) Discharge Header Modification CX(s) Applied: B1.3 Date: 11/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office November 29, 2012 CX-008651: Categorical Exclusion Determination Dismantle and Remove (D&R) and Replace 773-A D-Wing Air Handling and Condensing Units CX(s) Applied: B1.3 Date: 05/17/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office November 29, 2012 CX-009608: Categorical Exclusion Determination Refurbish 607-53C Sanitary Sewer Lift Station CX(s) Applied: B1.3 Date: 11/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office November 27, 2012 CX-009611: Categorical Exclusion Determination

291

Savannah River Site | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Savannah River Site Savannah River Site Work is under way to decommission the Heavy Water Components Test Reactor, which had been used to test experimental fuel assemblies for commercial heavy-water power reactors. SRS is scheduled to remove the dome of the reactor this month (January 2011). Workers also will displace the reactor vessel and steam generators, grout the remaining structure in place, and install a concrete cover over the reactor's footprint Work is under way to decommission the Heavy Water Components Test Reactor, which had been used to test experimental fuel assemblies for commercial heavy-water power reactors. SRS is scheduled to remove the dome of the reactor this month (January 2011). Workers also will displace the reactor vessel and steam generators, grout the remaining structure in place, and

292

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 23, 2009 June 23, 2009 CX-000497: Categorical Exclusion Determination F-Canyon Complex Deactivation CX(s) Applied: B1.28 Date: 06/23/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office June 15, 2009 CX-000495: Categorical Exclusion Determination M-Area Chemical Oxidation (MACO) - Installation of Southern Sector Coreholes and Monitoring Wells Date: 06/15/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office June 15, 2009 CX-000496: Categorical Exclusion Determination F Area Hazardous Waste Management Facility Silver Chloride Solution Injection Wells CX(s) Applied: B6.2 Date: 06/15/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office

293

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 31, 2013 July 31, 2013 CX-010844: Categorical Exclusion Determination Subcontractor Repair of Leak Over Entry Door #1 at 703-B CX(s) Applied: B1.3 Date: 07/31/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office July 30, 2013 CX-010846: Categorical Exclusion Determination Install Stud, Shims, and Nut in the L-Basin 70-Ton Cask Lid Support Structure CX(s) Applied: B2.5 Date: 07/30/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office July 23, 2013 CX-010850: Categorical Exclusion Determination Install Well Pump into the F-Tank Farm Catch Tank FL-241901-WTS-TK-1 CX(s) Applied: B1.3 Date: 07/23/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office July 23, 2013 CX-010849: Categorical Exclusion Determination

294

Carson River Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

River Geothermal Area River Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Carson River Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (0) 10 References Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":6,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"300px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.77,"lon":-119.715,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

295

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 2, 2009 September 2, 2009 CX-000521: Categorical Exclusion Determination Cut and Cap #325 Steam Supply Header, 261-H Consolidated Incineration Facility CX(s) Applied: B1.27 Date: 09/02/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office September 2, 2009 CX-000520: Categorical Exclusion Determination 690-N (Ford Building) Fire System Isolation and Sanitary Sewer Grouting CX(s) Applied: B1.27 Date: 09/02/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office September 1, 2009 CX-000519: Categorical Exclusion Determination E-Area Box Remediation Project CX(s) Applied: B6.6 Date: 09/01/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office

296

Huaneng Lancang River Hydropower | Open Energy Information  

Open Energy Info (EERE)

Lancang River Hydropower Lancang River Hydropower Jump to: navigation, search Name Huaneng Lancang River Hydropower Place Kunming, Yunnan Province, China Zip 650214 Sector Hydro, Solar Product Developer of hydro and solar power projects. Coordinates 25.051001°, 102.702011° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":25.051001,"lon":102.702011,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

297

Illinois River Energy LLC | Open Energy Information  

Open Energy Info (EERE)

River Energy LLC River Energy LLC Jump to: navigation, search Name Illinois River Energy LLC Place Rochelle, Illinois Zip 61068 Product Owns and operates the Rochelle bioethanol plant producing ethanol and feedstock from grain. Coordinates 38.301544°, -78.272893° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.301544,"lon":-78.272893,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

298

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 15, 2013 March 15, 2013 CX-010126: Categorical Exclusion Determination Operation of Induction Furnace Fabrication Lab CX(s) Applied: B3.6 Date: 03/15/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office March 15, 2013 CX-010125: Categorical Exclusion Determination Microfluidics for Advanced Separation and Ultrasensitive Detection CX(s) Applied: B3.6 Date: 03/15/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office March 15, 2013 CX-010131: Categorical Exclusion Determination Replacement of the 254-13H Safety Significant (SS) Standby Diesel Generator CX(s) Applied: B1.25 Date: 03/15/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office March 15, 2013 CX-010130: Categorical Exclusion Determination Mechanical Isolation of Plant Air System at TNX

299

Savannah River Site | National Nuclear Security Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

Site | National Nuclear Security Administration Site | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Our Locations > Savannah River Site Savannah River Site http://www.srs.gov/general/srs-home.html Field Office: Located south of Aiken, South Carolina, the Savannah River Field Office (SRFO) is responsible for the NNSA Defense Program missions at

300

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 13, 2013 August 13, 2013 CX-011158: Categorical Exclusion Determination Subcontractor Repair of Roof Leaks at 717-11A CX(s) Applied: B1.3 Date: 08/13/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office August 13, 2013 CX-011157: Categorical Exclusion Determination Subcontractor Roof Repairs in Telecom Room at 702-C CX(s) Applied: B1.3 Date: 08/13/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office August 8, 2013 CX-011163: Categorical Exclusion Determination Subcontractor Repair of Roof Leaks at 730-4B CX(s) Applied: B1.3 Date: 08/08/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office August 8, 2013 CX-011162: Categorical Exclusion Determination Subcontractor Repair of Roof Leaks at 730-1B CX(s) Applied: B1.3

Note: This page contains sample records for the topic "river experi mental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Great River Energy | Open Energy Information  

Open Energy Info (EERE)

Great River Energy Great River Energy Place Minnesota Utility Id 7570 Utility Location Yes Ownership C NERC Location MRO NERC MRO Yes ISO MISO Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates No Rates Available References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=Great_River_Energy&oldid=410764"

302

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 9, 2010 August 9, 2010 CX-003633: Categorical Exclusion Determination Install Platform and Stairs at F-10 Outfall CX(s) Applied: B2.3 Date: 08/09/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office August 4, 2010 CX-003635: Categorical Exclusion Determination D-Area Chemical Truck Unloading Station CX(s) Applied: B2.5 Date: 08/04/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office August 4, 2010 CX-003636: Categorical Exclusion Determination 484-D Sump Discharge Line Installation CX(s) Applied: B1.3 Date: 08/04/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office July 30, 2010 CX-003640: Categorical Exclusion Determination Howard T. Ricketts Laboratory (HTRL) Lab 134 CX(s) Applied: B3.6

303

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 20, 2011 April 20, 2011 CX-005766: Categorical Exclusion Determination Filter Testing with Static Test Cell CX(s) Applied: B3.6 Date: 04/20/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office April 19, 2011 CX-005769: Categorical Exclusion Determination Dismantle and Removal (D&R) and Enhance Chemical Cleaning (ECC) on Waste Tank 8F (General) CX(s) Applied: B1.28 Date: 04/19/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office April 15, 2011 CX-005771: Categorical Exclusion Determination Install Alternate Diesel Generator and Tie-In Connection for HB-Line CX(s) Applied: B2.5 Date: 04/15/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office

304

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 16, 2013 April 16, 2013 CX-010322: Categorical Exclusion Determination Research and Development Welding and Brazing Sample Preparation and Activities in Building 723-A CX(s) Applied: B3.6 Date: 04/16/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office April 16, 2013 CX-010321: Categorical Exclusion Determination Destructive Evaluation of Plutonium Storage Can Bundles CX(s) Applied: B3.6 Date: 04/16/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office April 16, 2013 CX-010320: Categorical Exclusion Determination Corrosion Testing in Aqueous Solutions CX(s) Applied: B3.6 Date: 04/16/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office April 15, 2013 CX-010324: Categorical Exclusion Determination 772-F Chase 174 Sprinkler Modification

305

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 23, 2010 February 23, 2010 CX-001128: Categorical Exclusion Determination Closure of 607-10G Septic Tank (Served 661-G) CX(s) Applied: B1.27 Date: 02/23/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office February 23, 2010 CX-001127: Categorical Exclusion Determination Ballistic Resistant Enclosure Hatch Counterbalance CX(s) Applied: B2.5 Date: 02/23/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office February 23, 2010 CX-000878: Categorical Exclusion Determination 293-F Stack Risk Reduction Project CX(s) Applied: B1.28 Date: 02/23/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office February 23, 2010

306

New River Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

New River Geothermal Area New River Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: New River Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (13) 10 References Area Overview Geothermal Area Profile Location: California Exploration Region: Gulf of California Rift Zone GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed. Add a new Operating Power Plant

307

Lower Colorado River Authority | Open Energy Information  

Open Energy Info (EERE)

River Authority River Authority Jump to: navigation, search Name Lower Colorado River Authority Place Texas Utility Id 11269 Utility Location Yes Ownership S NERC Location TRE NERC ERCOT Yes ISO Ercot Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes Activity Bundled Services Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates No Rates Available References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a"

308

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 24, 2012 July 24, 2012 CX-009067: Categorical Exclusion Determination Deactivation and Decommissioning of the D-Area Detritiation Cells and Relocation of Associated Handi-Houses CX(s) Applied: B1.23 Date: 07/24/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office July 24, 2012 CX-009066: Categorical Exclusion Determination Characterization of Downgradient Volatile Organic Compounds Plume and Installation of Monitoring Well CX(s) Applied: B3.1 Date: 07/24/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office July 24, 2012 CX-009065: Categorical Exclusion Determination Installation of Sentinel Wells ASB011B/011C for A-2 Air Stripper Shutdown CX(s) Applied: B3.1 Date: 07/24/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office

309

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 11, 2009 August 11, 2009 CX-000513: Categorical Exclusion Determination Cone Penetration Test sampling at ECODS (Early Construction and Operational Disposal Sites) B3 and B5 CX(s) Applied: B3.1 Date: 08/11/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office August 5, 2009 CX-000511: Categorical Exclusion Determination Isolation of Domestic Water Line, 782-4G CX(s) Applied: B1.3 Date: 08/05/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office August 5, 2009 CX-000512: Categorical Exclusion Determination Tree Removal and Chipping at P-Area Ash Basin and R-Area Ash Basin and P-007 Outfall Date: 08/05/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office

310

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 25, 2010 October 25, 2010 CX-004445: Categorical Exclusion Determination Waste Treatment Plant Secondary Waste Radioactive Fluidized Bed Steam Reforming (Module A) CX(s) Applied: B3.6 Date: 10/25/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office October 15, 2010 CX-004450: Categorical Exclusion Determination Plutonium Glass Sectioning CX(s) Applied: B3.6 Date: 10/15/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office October 15, 2010 CX-004449: Categorical Exclusion Determination Bench Scale Testing to Provide Data on Precipitation Control in the Cesium Nitric Acid Recovery Process CX(s) Applied: B3.6 Date: 10/15/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office October 15, 2010

311

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 10, 2010 December 10, 2010 CX-004837: Categorical Exclusion Determination Measurement of Compressive Strength CX(s) Applied: B3.6 Date: 12/10/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office December 7, 2010 CX-004826: Categorical Exclusion Determination Piezometer Well Installation for 1,4-Dioxane Monitoring CX(s) Applied: B3.1 Date: 12/07/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office December 7, 2010 CX-004824: Categorical Exclusion Determination Dismantle and Remove Tank 6 Riser 7 for Waste Determination (WD) Sampling CX(s) Applied: B1.3 Date: 12/07/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office December 7, 2010 CX-004823: Categorical Exclusion Determination Consolidation of K- and L-Area Heavy Water in C-Area

312

Mary's River Geothermal Project | Open Energy Information  

Open Energy Info (EERE)

River Geothermal Project River Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Mary's River Geothermal Project Project Location Information Coordinates 41.750555555556°, -115.30194444444° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.750555555556,"lon":-115.30194444444,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

313

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 24, 2011 January 24, 2011 CX-005090: Categorical Exclusion Determination Stairway to FM-1H CX(s) Applied: B2.3 Date: 01/24/2011 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office January 21, 2011 CX-005109: Categorical Exclusion Determination Y589, Mobile Digital Radiography Identification System - Station CX(s) Applied: B1.15 Date: 01/21/2011 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office January 20, 2011 CX-005108: Categorical Exclusion Determination Thin Films for Whisker Growth CX(s) Applied: B3.6 Date: 01/20/2011 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office January 19, 2011 CX-005107: Categorical Exclusion Determination Karl Fisher Titration CX(s) Applied: B3.6 Date: 01/19/2011

314

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 29, 2010 November 29, 2010 CX-004808: Categorical Exclusion Determination Flowsheet Evaluation for the Neutralization of High Aluminum ? Low Uranium Used Nuclear Fuel (UNF) Solution CX(s) Applied: B3.6 Date: 11/29/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office November 29, 2010 CX-004809: Categorical Exclusion Determination Reactive Gas Reprocessing of Used Nuclear Fuel Simulants CX(s) Applied: B3.6 Date: 11/29/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office November 29, 2010 CX-004806: Categorical Exclusion Determination Volume Measurement of Solids by Gas Pycnometry CX(s) Applied: B3.6 Date: 11/29/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office November 12, 2010 CX-004805: Categorical Exclusion Determination

315

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 11, 2009 December 11, 2009 CX-000815: Categorical Exclusion Determination Hydrogen Technology Laboratory 140 - Chromatography, Wet Laboratory CX(s) Applied: B3.6 Date: 12/11/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office December 8, 2009 CX-000819: Categorical Exclusion Determination Thin-Film Development Laboratory CX(s) Applied: B3.6 Date: 12/08/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office December 8, 2009 CX-000820: Categorical Exclusion Determination Vacuum Induction Melting of Metals CX(s) Applied: B3.6 Date: 12/08/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office December 8, 2009 CX-000818: Categorical Exclusion Determination

316

Raft River Geothermal Exploratory Hole No. 3  

DOE Green Energy (OSTI)

Raft River Geothermal Exploratory Hole No. 3 (RRGE-3) is an exploratory hole with three directional legs, drilled to depths ranging from approximately 5,500 to 6,000 feet into intruded quartz monzonite basement rock of the Raft River valley of southeastern Idaho. The goal of the Raft River Geothermal R and D program is to determine the feasibility of developing and utilizing medium temperature (300/sup 0/F) geothermal resources for power generation and nonelectrical applications. This well was drilled to provide data to further investigate and evaluate the geothermal reservoir, as well as to optimize the location of possible future resource and/or injection wells and to develop methods to reduce the cost of geothermal wells. The drilling and completion of RRGE-3 is described and the daily drilling reports, drill bit records, descriptions of the casing, cementing, logging and coring programs, and the containment techniques employed on RRGE-3 are included.

Shoopman, H.H. (comp.)

1977-06-01T23:59:59.000Z

317

Historical river flow rates for dose calculations  

Science Conference Proceedings (OSTI)

Annual average river flow rates are required input to the LADTAP Computer Code for calculating offsite doses from liquid releases of radioactive materials to the Savannah River. The source of information on annual river flow rates used in dose calculations varies, depending on whether calculations are for retrospective releases or prospective releases. Examples of these types of releases are: Retrospective - releases from routine operations (annual environmental reports) and short term release incidents that have occurred. Prospective - releases that might be expected in the future from routine or abnormal operation of existing or new facilities (EIS`s, EID`S, SAR`S, etc.). This memorandum provides historical flow rates at the downstream gauging station at Highway 301 for use in retrospective dose calculations and derives flow rate data for the Beaufort-Jasper and Port Wentworth water treatment plants.

Carlton, W.H.

1991-06-10T23:59:59.000Z

318

Flood Forecasting in River System Using ANFIS  

Science Conference Proceedings (OSTI)

The aim of the present study is to investigate applicability of artificial intelligence techniques such as ANFIS (Adaptive Neuro-Fuzzy Inference System) in forecasting flood flow in a river system. The proposed technique combines the learning ability of neural network with the transparent linguistic representation of fuzzy system. The technique is applied to forecast discharge at a downstream station using flow information at various upstream stations. A total of three years data has been selected for the implementation of this model. ANFIS models with various input structures and membership functions are constructed, trained and tested to evaluate efficiency of the models. Statistical indices such as Root Mean Square Error (RMSE), Correlation Coefficient (CORR) and Coefficient of Efficiency (CE) are used to evaluate performance of the ANFIS models in forecasting river flood. The values of the indices show that ANFIS model can accurately and reliably be used to forecast flood in a river system.

Ullah, Nazrin; Choudhury, P. [Dept. of Civil Eng., NIT, Silchar (India)

2010-10-26T23:59:59.000Z

319

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 7, 2012 February 7, 2012 CX-007967: Categorical Exclusion Determination Electrochemical Fluorination in Molten Fluoride Salts CX(s) Applied: B3.6 Date: 02/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office February 7, 2012 CX-007966: Categorical Exclusion Determination Sampling of Legacy Material for Material, Control & Accountability (MC&A) Verification CX(s) Applied: B3.6 Date: 02/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office February 7, 2012 CX-007965: Categorical Exclusion Determination Grout Formulation & Variability Testing CX(s) Applied: B3.6 Date: 02/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office February 6, 2012 CX-007971: Categorical Exclusion Determination

320

Milky River Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Milky River Geothermal Area Milky River Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Milky River Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (0) 10 References Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":6,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"300px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":52.32,"lon":-174.1472,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "river experi mental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Platte River Power Authority | Open Energy Information  

Open Energy Info (EERE)

River Power Authority River Power Authority Jump to: navigation, search Name Platte River Power Authority Place Colorado Website www.prpa.org/ Utility Id 15143 Utility Location Yes Ownership P NERC Location WECC NERC WECC Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Wholesale Marketing Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates No Rates Available References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a"

322

Reese River Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Reese River Geothermal Area Reese River Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Reese River Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (3) 9 Exploration Activities (10) 10 References Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":6,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"300px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.89,"lon":-117.14,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

323

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 7, 2011 November 7, 2011 CX-007671: Categorical Exclusion Determination Heat Exchanger Removal and Disposition CX(s) Applied: B6.1 Date: 11/07/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office November 7, 2011 CX-007670: Categorical Exclusion Determination Maintenance Excavation of the B-07 Outfall Ditch CX(s) Applied: B1.3 Date: 11/07/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office November 7, 2011 CX-007669: Categorical Exclusion Determination Vegetative Response to Metal Exposure in a Growing Media CX(s) Applied: B3.6 Date: 11/07/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office October 27, 2011 CX-007672: Categorical Exclusion Determination Sampling of Nuclear Fuel Assembly CX(s) Applied: B3.6

324

Pea River Electric Coop | Open Energy Information  

Open Energy Info (EERE)

Pea River Electric Coop Pea River Electric Coop Jump to: navigation, search Name Pea River Electric Coop Place Alabama Utility Id 14602 Utility Location Yes Ownership C NERC Location SERC Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Security Light: 100 watt high pressure sodium Lighting Security Light: 1000 watt metal halide Lighting Security Light: 250 watt high pressure sodium (flood) Lighting Security Light: 250 watt high pressure sodium (street) Lighting Security Light: 400 watt high pressure sodium Lighting Average Rates Residential: $0.1150/kWh Commercial: $0.1200/kWh

325

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 20, 2010 July 20, 2010 CX-003668: Categorical Exclusion Determination Subsurface Soils Exploration for Potential Pit Disassembly and Conversion Project Sandfilter Footprint CX(s) Applied: B3.1 Date: 07/20/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office July 7, 2010 CX-003670: Categorical Exclusion Determination Improvements to L Area Sidewalks CX(s) Applied: B1.3 Date: 07/07/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office July 7, 2010 CX-002984: Categorical Exclusion Determination Improvements to L Area Sidewalks CX(s) Applied: B1.3 Date: 07/07/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office June 25, 2010 CX-003671: Categorical Exclusion Determination

326

High Resolution River Hydraulic and Water Quality Characterization Using Rapidly Deployable Networked Infomechanical Systems (NIMS RD)  

E-Print Network (OSTI)

High Resolution River Hydraulic and Water Quality1594. High Resolution River Hydraulic and Water Qualityobserving spatiotemporal hydraulic and chemical properties

Thomas C. Harmon; Richard F. Ambrose; Robert M. Gilbert; Jason C. Fisher; Michael Stealey; William J. Kaiser

2006-01-01T23:59:59.000Z

327

Independent Oversight Follow-up Review, Savannah River National Laboratory- January 2012  

Energy.gov (U.S. Department of Energy (DOE))

Follow-up Review of Implementation Verification Reviews at the Savannah River National Laboratory Savannah River Site

328

EIS-0217: Savannah River Site Waste Management | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

17: Savannah River Site Waste Management 17: Savannah River Site Waste Management EIS-0217: Savannah River Site Waste Management Summary This EIS evaluates the potential environmental impacts and costs of storing, treating, and/or disposing of liquid high-level radioactive, low-level radioactive, hazardous, mixed (radioactive and hazardous), and transuranic wastes at SRS. Public Comment Opportunities None available at this time. Documents Available for Download June 28, 2001 EIS-0217: Amended Record of Decision Savannah River Site Waste Management, Savannah River Operations Office, Aiken, South Carolina May 19, 1997 EIS-0217: Supplemental Record of Decision Savannah River Site Waste Management May 19, 1997 EIS-0217: Supplemental Record of Decision Savannah River Site Waste Management, Savannah River Operations Office,

329

Preliminary Notice of Violation, Westinghouse Savannah River Company - EA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Preliminary Notice of Violation, Westinghouse Savannah River Preliminary Notice of Violation, Westinghouse Savannah River Company - EA 98-09 Preliminary Notice of Violation, Westinghouse Savannah River Company - EA 98-09 September 21, 1998 Preliminary Notice of Violation issued to Westinghouse Savannah River Company, related to Bioassay Program Deficiencies at the Savannah River Site, (EA-98-09) This letter refers to the Department of Energy's (DOE) investigation of the facts and circumstances concerning deficiencies in Westinghouse Savannah River Company's (WSRC) bioassay participation requirements and WSRC's corrective actions to remedy those deficiencies. Preliminary Notice of Violation, Westinghouse Savannah River Company - EA 98-09 More Documents & Publications Preliminary Notice of Violation, Westinghouse Savannah River Company -

330

Independent Activity Report, Savannah River Site - March 2013 | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site - March 2013 Savannah River Site - March 2013 Independent Activity Report, Savannah River Site - March 2013 March 2013 Oversight Scheduling an Operational Awareness at the Savannah River Site [HIAR-SRS-2013-03-25] Activity Description/Purpose: The Independent Oversight Site Lead for the Savannah River Site traveled to the site to work with functional area managers to schedule nuclear safety oversight activities. The Site Lead reviewed the differing professional opinion (DPO) program at the Savannah River Operations Office (Department of Energy (DOE)-SR). Independent Activity Report, Savannah River Site - March 2013 More Documents & Publications Independent Oversight Review, Savannah River Operations Office - July 2013 Policy Flash 2013-74 Quarterly Notification of the DOE's Differing

331

Climatic Aspects of the 1993 Upper Mississippi River Basin Flood  

Science Conference Proceedings (OSTI)

The 1993 record-breaking summer flood in the Upper Mississippi River Basin resulted from an unprecedentedly persistent heavy rain pattern. Rainfall totals for the Upper Mississippi River Basin were, by a large margin, the largest of this century ...

Kenneth E. Kunkel; Stanley A. Changnon; James R. Angel

1994-05-01T23:59:59.000Z

332

The Water Budget of the Kuparuk River Basin, Alaska  

Science Conference Proceedings (OSTI)

A water budget study that considers precipitation, river runoff, evapotranspiration, and soil moisture for the Kuparuk River basin on the North Slope of Alaska is presented. Numerical simulations of hydrologic processes using the NASA Catchment-...

Stephen J. Dry; Marc Stieglitz; sa K. Rennermalm; Eric F. Wood

2005-10-01T23:59:59.000Z

333

Surface-to-Atmosphere Exchange in a River Valley Environment  

Science Conference Proceedings (OSTI)

Observations of the turbulent exchange between a river surface and the atmosphere in a mountainous area in southern Brazil are presented and discussed. A micrometeorological tower was installed directly above the surface of a 60-m-wide river. ...

Otvio C. Acevedo; Osvaldo L. L. Moraes; Rodrigo da Silva; Vagner Anabor; Daniel P. Bittencourt; Hans R. Zimmermann; Roberto O. Magnago; Gervsio A. Degrazia

2007-08-01T23:59:59.000Z

334

Exploratory Well At Raft River Geothermal Area (1977) | Open Energy  

Open Energy Info (EERE)

7) 7) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Exploratory Well At Raft River Geothermal Area (1977) Exploration Activity Details Location Raft River Geothermal Area Exploration Technique Exploratory Well Activity Date 1977 Usefulness not indicated DOE-funding Unknown Notes Raft River Geothermal Exploratory Hole No. 4, RRGE-4 drilled. During this time Raft River geothermal exploration well sidetrack-C also completed. References Kunze, J. F.; Stoker, R. C.; Allen, C. A. (14 December 1977) Update on the Raft River Geothermal Reservoir Covington, H.R. (1 January 1978) Deep drilling data, Raft River geothermal area, Idaho-Raft River geothermal exploration well sidetrack-C Retrieved from "http://en.openei.org/w/index.php?title=Exploratory_Well_At_Raft_River_Geothermal_Area_(1977)&oldid=473847"

335

Wabash River Heritage Corridor (Indiana) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Wabash River Heritage Corridor (Indiana) Wabash River Heritage Corridor (Indiana) Wabash River Heritage Corridor (Indiana) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor Industrial Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info Start Date 1991 State Indiana Program Type Siting and Permitting Provider Wabash River Heritage Corridor Commission The Wabash River Heritage Corridor, consisting of the Wabash River, the Little River, and the portage between the Little River and the Maumee

336

Savannah River Site Achieves Transuranic Waste Disposition Goal in 2013 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Achieves Transuranic Waste Disposition Goal in Savannah River Site Achieves Transuranic Waste Disposition Goal in 2013 Savannah River Site Achieves Transuranic Waste Disposition Goal in 2013 December 24, 2013 - 12:00pm Addthis Workers gather behind a “Safety and Security begins with Me” banner at the Savannah River Site. Workers gather behind a "Safety and Security begins with Me" banner at the Savannah River Site. Workers sort through transuranic waste at the Savannah River Site. Workers sort through transuranic waste at the Savannah River Site. SRR employees Glenn Kelly and Fred Merriweather pour the final amount of grout into Tank 6. SRR employees Glenn Kelly and Fred Merriweather pour the final amount of grout into Tank 6. Workers gather behind a "Safety and Security begins with Me" banner at the Savannah River Site.

337

BLM Four Rivers Field Office | Open Energy Information  

Open Energy Info (EERE)

Four Rivers Field Office Jump to: navigation, search Name BLM Four Rivers Field Office Address 3948 Development Ave. Place Boise, ID Zip 83705 Phone number 208-384-3300 Website...

338

Ohio River Valley Water Sanitation Commission (Multiple States)  

Energy.gov (U.S. Department of Energy (DOE))

The Ohio River Valley Water Sanitation Commission (ORSANCO), was established on June 30, 1948 to control and abate pollution in the Ohio River Basin. ORSANCO is an interstate commission...

339

Re: Potomac River Generating Station Department of Energy Case...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Potomac River Generating Station Department of Energy Case No. EO-05-01: Advanced Notice of Power Outages. Notification of Planned 230kV Outage at Potomac River Generating Station...

340

Re: Potomac River Generating Station Department of Energy, Case...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2005 ("DOE Potomac River Order") Pepco hereby files this revised notice of the planned outage of the 230 kV circuits serving the Potomac River Substation, and through that...

Note: This page contains sample records for the topic "river experi mental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

U. S. Department of Energy Savannah River Operations Office ...  

NLE Websites -- All DOE Office Websites (Extended Search)

River Operations Office Mission Welcome to the Savannah River Operations Office (DOE-SR) website. DOE-SR is a U.S. Department of Energy (DOE) organization that serves as...

342

U. S. Department of Energy Savannah River Operations Office ...  

NLE Websites -- All DOE Office Websites (Extended Search)

Financial Officer for the U.S. Department of Energy Savannah River Operations Office (DOE-SR) at the Savannah River Site (SRS) in Aiken, South Carolina. Serving dual roles as...

343

U.S. DEPARTMENT OF ENERGY * SAVANNAH RIVER ...  

NLE Websites -- All DOE Office Websites (Extended Search)

SRNL Office of Communications 803.725.4396 Located at the U.S. Department of Energy's Savannah River Site near Aiken, South Carolina Operated by Savannah River Nuclear Solutions...

344

DOE Issues Salt Waste Determination for the Savannah River Site...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Salt Waste Determination for the Savannah River Site DOE Issues Salt Waste Determination for the Savannah River Site January 18, 2006 - 10:49am Addthis WASHINGTON, DC - The U.S....

345

Exhibit D: Mirant Potomac River Schedule of Unit Operations:...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4, January - March 2006 Exhibit D: Mirant Potomac River Schedule of Unit Operations: Supplement 4, January - March 2006 Docket No. EO-05-01: Exhibit D: Mirant Potomac River...

346

Exhibit D: Mirant Potomac River Schedule of Unit Operations:...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January - March 2006 Exhibit D: Mirant Potomac River Schedule of Unit Operations: January - March 2006 Docket No. EO-05-01: Exhibit D: Mirant Potomac River Schedule of Unit...

347

Savannah River Ecology Laboratory FY2006 Annual Technical Progress Report  

SciTech Connect

FY2006 annual report of research conducted by the Savannah River Ecology Laboratory, a research unit of the University of Georgia operating on the Savannah River Site in Aiken, County, SC.

Paul M. Bertsch

2006-10-23T23:59:59.000Z

348

How to Save a River: a handbook for citizen action  

E-Print Network (OSTI)

How to Save a River: a handbook for citizen action. By DavidDavid M. How to Save a River: a handbook for citizen action.to create an effective handbook for citizens interested in

Glaser, Christopher D.

1997-01-01T23:59:59.000Z

349

Savannah River Ecology Laboratory 2004 Annual Technical Progress Report  

SciTech Connect

2004 annual report of research conducted by the Savannah River Ecology Laboratory, a research unit of The University of Georgia operating on the Savannah River Site in Aiken, South Carolina

Paul M. Bertsch

2004-07-29T23:59:59.000Z

350

Savannah River Ecology Laboratory 2005 Annual Technical Progress Report  

SciTech Connect

2005 annual report of research conducted by the Savannah River Ecology Laboratory, a research unit of The University of Georgia operating on the Savannah River Site, Aiken, South Carolina

Paul M. Bertsch

2005-07-19T23:59:59.000Z

351

Cultural Relations of the Gila River and Lower Colorado Tribes  

E-Print Network (OSTI)

OF THE GILA RIVER AND LOWER COLORADO TRIBES Included in theGila River and Lower Colorado Tribes" by Professor Leslieof the Yumans on the Lower Colorado, but that the Pima, at

Gifford, Edward Winslow

1936-01-01T23:59:59.000Z

352

Lower Colorado River Peoples: Hostilities and Hunger, 1850-1857  

E-Print Network (OSTI)

Office. White, C 1974 Lower Colorado River Area AboriginalJ. 1965 Warriors of the Colorado: The Yumans of the QuechanJ. C 1861 Report Upon the Colorado River of the West . . .

Kroeber, Clifton B

1980-01-01T23:59:59.000Z

353

SAVANNAH RIVER TECHNOLOGY CENTER MONTHLY REPORT AUGUST 1992  

Science Conference Proceedings (OSTI)

'This monthly report summarizes Programs and Accomplishments of the Savannah River Technology Center in support of activities at the Savannah River Site. The following categories are addressed: Reactor, Tritium, Separations, Environmental, Waste Management, General, and Items of Interest.'

Ferrell, J.M.

1999-06-21T23:59:59.000Z

354

Evaluate Status of Pacific Lamprey in the Clearwater River and Salmon River Drainages, Idaho, 2009 Technical Report.  

DOE Green Energy (OSTI)

Pacific lamprey Lampetra tridentata have received little attention in fishery science until recently, even though abundance has declined significantly along with other anadromous fish species in Idaho. Pacific lamprey in Idaho have to navigate over eight lower Snake River and Columbia River hydroelectric facilities for migration downstream as juveniles to the Pacific Ocean and again as adults migrating upstream to their freshwater spawning grounds in Idaho. The number of adult Pacific lamprey annually entering the Snake River basin at Ice Harbor Dam has declined from an average of over 18,000 during 1962-1969 to fewer than 600 during 1998-2006. Based on potential accessible streams and adult escapement over Lower Granite Dam on the lower Snake River, we estimate that no more than 200 Pacific lamprey adult spawners annually utilize the Clearwater River drainage in Idaho for spawning. We utilized electrofishing in 2000-2006 to capture, enumerate, and obtain biological information regarding rearing Pacific lamprey ammocoetes and macropthalmia to determine the distribution and status of the species in the Clearwater River drainage, Idaho. Present distribution in the Clearwater River drainage is limited to the lower sections of the Lochsa and Selway rivers, the Middle Fork Clearwater River, the mainstem Clearwater River, the South Fork Clearwater River, and the lower 7.5 km of the Red River. In 2006, younger age classes were absent from the Red River.

Cochnauer, Tim; Claire, Christopher [Idaho Department of Fish and Game

2009-05-07T23:59:59.000Z

355

River Protection Project (RPP) Level 0 Logic  

SciTech Connect

The following modifications were made to the River Protection Project Level-0 logic in going from Rev. I to Rev. 2. The first change was the change to the heading at the top of the drawing: ''TWRS Program Logic'' to ''River Protection Project Mission Logic''. Note that purely format changes (e.g., fonts, location of boxes, date format, addition of numbers to ''ghost'' boxes) are not discussed. However, the major format change was to show DOE-BNFL Inc. Interface Control Documents (ICDs) on the logic.

SEEMAN, S.E.

2000-01-20T23:59:59.000Z

356

Radioiodine in the Savannah River Site environment  

Science Conference Proceedings (OSTI)

Radioiodine, which is the collective term for all radioactive isotopes of the element iodine, is formed at the Savannah River Site (SRS) principally as a by-product of nuclear reactor operations. Part of the radioiodine is released to the environment during reactor and reprocessing operations at the site. The purpose of this report is to provide an introduction to radioiodine production and disposition, its status in the environment, and the radiation dose and health risks as a consequence of its release to the environment around the Savannah River Plant. A rigorous dose reconstruction study is to be completed by thee Center for Disease Control during the 1990s.

Kantelo, M.V.; Bauer, L.R.; Marter, W.L.; Murphy, C.E. Jr.; Zeigler, C.C.

1993-01-15T23:59:59.000Z

357

The Ecology of the Navasota River, Texas  

E-Print Network (OSTI)

A general Limnological Survey was made of the Navasota River, Texas, a tributary of the Brazos River, between February, 1968 and March, 1970. Five stations on the main channel were visited twice monthly from February, 1968 to January, 1970, and three major tributaries were visited twice monthly from April, 1969 to March, 1970, at a station near the mouth of each. In addition, collections of fishes and benthos were made from 144 sites distributed throughout the watershed. Data provided include, discharge, temperature, pH, specific conductance, chloride, sulfate, nitrate, hardness, organics, trace elements, bacteria, zooplankton, macro-drift, algae, benthos and fishes (with distribution maps of fish species).

Clark, W. J.

1973-12-01T23:59:59.000Z

358

PIA - Savannah River Nuclear Solution (SRNS) Energy Employees...  

NLE Websites -- All DOE Office Websites (Extended Search)

Employees Occupational Illness Compensation Program Act (EEOICPA) PIA - Savannah River Nuclear Solution (SRNS) Energy Employees Occupational Illness Compensation Program Act...

359

2012 Annual Planning Summary for Office of River Protection  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within Office of River Protection.

360

Reconnaissance geothermal exploration at Raft River, Idaho from...  

Open Energy Info (EERE)

Reconnaissance geothermal exploration at Raft River, Idaho from thermal infrared scanning Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Journal Article:...

Note: This page contains sample records for the topic "river experi mental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

2012 Annual Planning Summary for Savannah River Operations Office  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within Savannah River Operations Office.

362

Terrestrial Carbon Inventory at the Savannah River Site, 1951 2001.  

Science Conference Proceedings (OSTI)

A Power Point slide presentation/report on the terestrial carbon inventory at the Savannah River Site.

US Forest Service - Annonymous,

2012-02-01T23:59:59.000Z

363

Potlatch River Watershed Restoration, Annual Report 2002-2003.  

DOE Green Energy (OSTI)

The project's goal is to improve instream fish habitat in the Potlatch River and the lower Clearwater River through comprehensive watershed planning, implementation of best management practices and expanded water quality and fish habitat monitoring. This proposal has two primary objectives: (1) complete the Potlatch River watershed implementation plan; and, (2) augment existing monitoring efforts in the Potlatch River to broaden the water quality and fish resource data baseline.

Stinson, Kenneth

2003-09-01T23:59:59.000Z

364

TemporalSpatial Climate Variability in the Headwater Drainage Basins of the Yangtze River and Yellow River, China  

Science Conference Proceedings (OSTI)

Variability of the climate in the headwater drainage basins of the Yangtze River and Yellow River during 19612010 was investigated by examining four typical climatic variables: daily minimum, mean, and maximum temperatures and daily ...

Yan-Fang Sang; Zhonggen Wang; Changming Liu; Tongliang Gong

2013-07-01T23:59:59.000Z

365

Numerical Prediction of Precipitation and River Flow over the Russian River Watershed during the January 1995 California Storms  

Science Conference Proceedings (OSTI)

Precipitation and river flow during a January 1995 flood event over the Russian River watershed in the northern Coastal Range of California were simulated using the University of California Lawrence Livermore National Laboratory's Coupled ...

Norman L. Miller; Jinwon Kim

1996-01-01T23:59:59.000Z

366

River flow estimation using adaptive neuro fuzzy inference system  

Science Conference Proceedings (OSTI)

Accurate estimation of River flow changes is a quite important problem for a wise and sustainable use. Such a problem is crucial to the works and decisions related to the water resources and management. In this study, an adaptive network-based fuzzy ... Keywords: ANFIS, ANN, Fuzzy logic, Great Menderes River, River flow estimation

Mahmut Firat; Mahmud Gngr

2007-07-01T23:59:59.000Z

367

An integrated modelling framework for regulated river systems  

Science Conference Proceedings (OSTI)

Management of regulated water systems has become increasingly complex due to rapid socio-economic growth and environmental changes in river basins over recent decades. This paper introduces the Source Integrated Modelling System (IMS), and describes ... Keywords: Murray-Darling Basin, Rainfall-runoff modelling, River management and operations, River system modelling, Source IMS

Wendy D. Welsh; Jai Vaze; Dushmanta Dutta; David Rassam; Joel M. Rahman; Ian D. Jolly; Peter Wallbrink; Geoffrey M. Podger; Matthew Bethune; Matthew J. Hardy; Jin Teng; Julien Lerat

2013-01-01T23:59:59.000Z

368

Adult Mental Health Needs in California: Findings from the 2007 California Health Interview Survey  

E-Print Network (OSTI)

do for you. Funded by the California Department of MentalSuite 1550 Los Angeles, California 90024 Phone: 310.794.0909to represent the adult California population living in

Grant, David; Padilla-Frausto, Imelda; Aydin, May; Streja, Leanne; Aguilar-Gaxiola, Sergio; Caldwell, Julia

2011-01-01T23:59:59.000Z

369

from Savannah River Nuclear Solutions, LLC NEWS Savannah River Tritium Enterprise Achieves High Marks for  

NLE Websites -- All DOE Office Websites (Extended Search)

Tritium Enterprise Achieves High Marks for Tritium Enterprise Achieves High Marks for Support to Nation's Security Fiscal Year 2012 Performance Prepares Enterprise for Continued Service AIKEN, S.C. (February 7, 2013) - The National Nuclear Security Administration (NNSA) has rated the Savannah River Tritium Enterprise's overall Fiscal Year 2012 performance as "excel- lent," meaning that the Savannah River Site's tritium-related work has once again success- fully met and exceeded NNSA's Defense Programs goals. The Savannah River Tritium Enterprise (SRTE), which is managed for NNSA by Savannah River Nuclear Solutions (SRNS), earned the rating for its successful performance of the four missions it carries out in support of the nation's security: tritium supply, nuclear stockpile maintenance,

370

Reese River Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Reese River Geothermal Area Reese River Geothermal Area (Redirected from Reese River Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Reese River Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (3) 9 Exploration Activities (10) 10 References Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":6,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"300px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.89,"lon":-117.14,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

371

Land Use Baseline Report Savannah River Site  

Science Conference Proceedings (OSTI)

This document is to serve as a resource for Savannah River Site managers, planners, and SRS stakeholders by providing a general description of the site and land-use factors important to future use decisions and plans. The intent of this document is to be comprehensive in its review of SRS and the surrounding area.

Noah, J.C.

1995-06-29T23:59:59.000Z

372

Savannah River Laboratory monthly report, February 1992  

Science Conference Proceedings (OSTI)

This report is a progress report for the Savannah River Laboratory for the month of February 1992. The progress and activities in six categories were described in the report. The categories are reactor, tritium, separations, environmental, waste management, and general. Each category described numerous and varied activities. Some examples of these activities described are such things as radiation monitoring, maintenance, modifications, and remedial action.

Ferrell, J.M. [comp.; Ice, L.W. [ed.

1992-02-01T23:59:59.000Z

373

Raft River condenser-tube examination  

DOE Green Energy (OSTI)

In the program of development of a water treatment for the 5 MW Raft River power plants' carbon steel heat rejection system, four carbon steel tubes were analyzed in this batch. The results of visual and scanning electron microscope examination of the tubes are presented. (MHR)

Suciu, D.F.

1981-04-03T23:59:59.000Z

374

Savannah River Technology Center. Monthly report  

SciTech Connect

This is a monthly progress report from the Savannah River Laboratory for the month of January 1993. It has sections with work in the areas of reactor safety, tritium processes and absorption, separations programs and wastes, environmental concerns and responses, waste management practices, and general concerns.

Not Available

1993-01-01T23:59:59.000Z

375

PillowPillow--lavalava Columbia River Basalt  

E-Print Network (OSTI)

#12;PillowPillow--lavalava Columbia River Basalt (~15 Ma) Ocean floor Basalt (recent) #12;maficMechanisms of Crystalof Crystal FractionationFractionation InwardInward CrystallizationCrystallization The crystal mush crystallization process. #12;MechanismsMechanisms of Crystalof Crystal FractionationFractionation Inward

Siebel, Wolfgang

376

Lower Snake River I | Open Energy Information  

Open Energy Info (EERE)

Lower Snake River I Lower Snake River I Jump to: navigation, search Name Lower Snake River I Facility Lower Snake River I Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Puget Sound Energy Developer Puget Sound Energy Energy Purchaser Puget Sound Energy Location South of Pomeroy and north of Pataha Creek in Garfield County Coordinates 46.375632°, -117.703257° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":46.375632,"lon":-117.703257,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

377

Ecology of the river dolphin, Inia geoffrensis, in the Cinaruco River, Venezuela  

E-Print Network (OSTI)

The Cinaruco River is a tributary of the Orinoco River, and forms the southern boundary of Venezuela's newest national park, Santos Luzardo. Like other rivers of this region, the Cinaruco River undergoes an extreme seasonal flood cycle. River dolphins were studied from November 1993 to June 1994 to gather baseline data regarding their ecology, including distribution, habitat affinity, group size, population composition, and prey availability. Transects from watercraft were used to count river dolphins, and observation effort was recorded. River dolphin habitat was characterized by broad hydrologic features (i.e., river, lagoon, side channel or confluence), structural composition (i.e., beach, rocks, cutbank, submerged vegetation) and complexity. Population composition by age class was determined according to size. Photo-identification was used to recognize individual dolphins. Potential preyfish availability within habitats was determined by using seine nets and gillnets. Dolphin diet was inferred from one stomach sample and the literature. Dolphins were seen most often during falling water, and least often during rising water. Dolphins were most often seen in confluence areas, and were seldom seen in side channels. The presence of rocks or beaches was associated with a greater frequency of dolphin sightings, and sightings increased with habitat complexity. Average group size for the 8-mo study was 2.0 (O?.05) dolphins, and was greatest during rising water. Greatest densities occurred during failing water, at 3.8 (+O.54) dolphins/km. Calves were first sighted at the end of the dry season and became more common as the waters rose. Six individuals were recognized and resighted by photo-identification; one of these was sighted 8 times over a period of 186 days. The fish diversity of the study area was high, and comprised at least 161 species. The stomach of one Inia contained 15 fish, representing at least 4 species.

McGuire, Tamara Lee

1995-01-01T23:59:59.000Z

378

Coal River Mountain Action Several people asked for more information about the 23 June civil disobedience near Coal River  

E-Print Network (OSTI)

Coal River Mountain Action Several people asked for more information about the 23 June civil disobedience near Coal River Mountain. We need Dickens to describe the local situation, but you can glean the practice of mountaintop removal. Vernon Haltom vernoncrmw@gmail.com, head of Coal River Mountain Watch

Hansen, James E.

379

Savannah River National Laboratory Meets with Historically Black Colleges  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River National Laboratory Meets with Historically Black Savannah River National Laboratory Meets with Historically Black Colleges and Universities Savannah River National Laboratory Meets with Historically Black Colleges and Universities February 1, 2013 - 9:00am Addthis South Carolina State University students William Dumpson, left, and Alejandra Chirino, center, talk with Savannah River National Laboratory Director Dr. Terry Michalske at a recent research exchange involving the laboratory and seven historically black colleges and universities. South Carolina State University students William Dumpson, left, and Alejandra Chirino, center, talk with Savannah River National Laboratory Director Dr. Terry Michalske at a recent research exchange involving the laboratory and seven historically black colleges and universities.

380

Rappahannock River Basin Commission (Virginia) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rappahannock River Basin Commission (Virginia) Rappahannock River Basin Commission (Virginia) Rappahannock River Basin Commission (Virginia) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Virginia Program Type Siting and Permitting Provider Rappahannock River Basin Commission The Rappahannock River Basin Commission is an independent local entity

Note: This page contains sample records for the topic "river experi mental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Lumbee River EMC - Residential and Commercial Energy Efficiency Program |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lumbee River EMC - Residential and Commercial Energy Efficiency Lumbee River EMC - Residential and Commercial Energy Efficiency Program Lumbee River EMC - Residential and Commercial Energy Efficiency Program < Back Eligibility Commercial Residential Savings Category Heating & Cooling Commercial Heating & Cooling Cooling Heat Pumps Appliances & Electronics Water Heating Program Info State North Carolina Program Type Utility Rebate Program Rebate Amount Programmable Thermostat: $15 Central AC: $25 - $50 Heat Pump: $60 - $195 Geothermal Heat Pump: $350 Water Heaters: $45 - $75 Heat Pump Water Heater: $425 Refrigerator/Freezer Recycling: $50 - $75 Provider Lumbee River Electric Membership Corporation Lumbee River EMC (LREMC) offers rebates to its residential customers who purchase and install qualified energy efficient products or services.

382

Salt River Electric - Residential Energy Efficiency Rebate Program |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Salt River Electric - Residential Energy Efficiency Rebate Program Salt River Electric - Residential Energy Efficiency Rebate Program Salt River Electric - Residential Energy Efficiency Rebate Program < Back Eligibility Residential Savings Category Home Weatherization Commercial Weatherization Sealing Your Home Heating & Cooling Construction Commercial Heating & Cooling Design & Remodeling Other Ventilation Heat Pumps Program Info State Kentucky Program Type Utility Rebate Program Rebate Amount Varies by technology Provider Salt River Electric Cooperative Salt River Electric serves as the rural electric provider in Kentucky's Bullitt, Nelson, Spencer, and Washington counties. Residential customers are eligible for a variety of cash incentives for energy efficiency. The Touchstone Energy Home Program provides a rebate of up to $250 to customers

383

Flathead River Creel Report, 1992-1993. Final Report.  

DOE Green Energy (OSTI)

A roving creel survey was conducted on the Flathead River system, May 1992 through May 1993, as part of Hungry Horse Dam Fisheries Mitigation, funded by Bonneville Power Administration. The Flathead River system is a tributary to the Clarks Fork of the Columbia River originating in northwest Montana and southern British Columbia. The river creel survey was conducted in conjunction with a Flathead Lake creel survey. This document summarizes the creel survey on the river system. The purpose of these creel surveys was to quantify fishery status prior to mitigation efforts and provide replicative survey methodology to measure success of future mitigation activities. 4 figs., 21 tabs.

Hanzel, Delano

1995-09-01T23:59:59.000Z

384

Independent Specific Administrative Controls Review, Office of River  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Office of River Protection - December 2010 Independent Specific Administrative Controls Review, Office of River Protection - December 2010 December 2010 Specific Administrative Controls Review with the Office of Environmental Management at the Office of River Protection The U.S. Department of Energy Office of Independent Oversight, within the Office of Health, Safety and Security, participated in an Office of Environmental Management Office of Standards and Quality Assurance, EM-23, review of Specific Administrative Controls (SAC). The EM-23 review included selected Office of River Protection programs at the Hanford Site. Independent Specific Administrative Controls Review, Office of River Protection - December 2010 More Documents & Publications Independent Specific Administrative Controls Review, Richland Operations

385

Savannah River National Laboratory Meets with Historically Black Colleges  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River National Laboratory Meets with Historically Black Savannah River National Laboratory Meets with Historically Black Colleges and Universities Savannah River National Laboratory Meets with Historically Black Colleges and Universities February 1, 2013 - 9:00am Addthis South Carolina State University students William Dumpson, left, and Alejandra Chirino, center, talk with Savannah River National Laboratory Director Dr. Terry Michalske at a recent research exchange involving the laboratory and seven historically black colleges and universities. South Carolina State University students William Dumpson, left, and Alejandra Chirino, center, talk with Savannah River National Laboratory Director Dr. Terry Michalske at a recent research exchange involving the laboratory and seven historically black colleges and universities.

386

Pearl River Valley Electric Power Association - Residential Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pearl River Valley Electric Power Association - Residential Energy Pearl River Valley Electric Power Association - Residential Energy Efficiency Rebate Program Pearl River Valley Electric Power Association - Residential Energy Efficiency Rebate Program < Back Eligibility Residential Savings Category Heating & Cooling Commercial Heating & Cooling Heat Pumps Appliances & Electronics Water Heating Program Info State Mississippi Program Type Utility Rebate Program Rebate Amount New Homes Heat Pump: $150 - $500 Geothermal Heat Pump: $500 Electric Water Heater: $150 Existing Homes Heat Pump: $200 Gas to Electric Water Heater Conversion: $150 Provider Pearl River Valley Electric Power Association Pearl River Valley Electric Power Association provides incentives through its Comfort Advantage Program to encourage energy efficiency within the

387

Independent Oversight Review, Savannah River Site - September 2011 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site - September 2011 Savannah River Site - September 2011 Independent Oversight Review, Savannah River Site - September 2011 September 2011 Review of the Implementation Verification Review Processes at the Savannah River Site Environmental Management Nuclear Facilities The Office of Enforcement and Oversight (Independent Oversight) within the Office of Health, Safety and Security (HSS), conducted an independent review of the Implementation Verification Review (IVR) Processes at Savannah River Site Environmental Management Nuclear Facilities. The overall objective of the Independent Oversight IVR review process includes verification that contractors and site offices have developed and implemented appropriate methods for performing IVRs (including direction for scheduling and conducting IVR activities) and measurement of the

388

River Falls Municipal Utilities - Renewable Energy Finance Program |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

River Falls Municipal Utilities - Renewable Energy Finance Program River Falls Municipal Utilities - Renewable Energy Finance Program River Falls Municipal Utilities - Renewable Energy Finance Program < Back Eligibility Residential Savings Category Other Buying & Making Electricity Solar Heating & Cooling Commercial Heating & Cooling Heating Water Heating Wind Program Info State Wisconsin Program Type PACE Financing Provider River Falls Municipal Utilities River Falls Municipal Utilities (RFMU) offers loans of $2,500 - $50,000 to its residential customers for the installation of photovoltaic (PV), solar thermal, geothermal, wind electric systems. The program will also support the installation of energy efficiency measures in connection with a qualifying renewable energy project, provided that the renewable energy

389

Enforcement Documents - Savannah River Site | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Savannah River Site Enforcement Documents - Savannah River Site April 13, 2010 Consent Order, Parsons Infrastructure & Technology Group, Inc. - NCO-2010-02 Consent Order issued to Parsons Infrastructure & Technology Group, Inc. related to Nuclear Facility Construction Deficiencies and Subcontractor Oversight at the Salt Waste Processing Facility at the Savannah River Site April 13, 2010 Enforcement Letter, Parsons Technology Development & Fabrication Complex - April 13, 2010 Enforcement Letter issued to Parsons Technology Development & Fabrication Complex related to Deficiencies in the Fabrication of Safety Significant Embed Plates at the Salt Waste Processing Facility at the Savannah River Site, April 13, 2010 Enforcement Letter, Amer Industrial Technologies - April 13, 2010

390

Intelligent human interface based on mental cloning-based software  

Science Conference Proceedings (OSTI)

This paper reports on our experience in adapting emotional experiences of the software engineers in the evolutionary design of software systems. This paper represents the progress report on the development relative to the state of art needed to have ... Keywords: Cognitive modeling, Facial analysis, Human computer interaction, Intelligent software, Software development, Sound analysis

Hamido Fujita; Jun Hakura; Masaki Kurematu

2009-04-01T23:59:59.000Z

391

Geophysical Method At Raft River Geothermal Area (1975) | Open Energy  

Open Energy Info (EERE)

Method At Raft River Geothermal Area (1975) Method At Raft River Geothermal Area (1975) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geophysical Method At Raft River Geothermal Area (1975) Exploration Activity Details Location Raft River Geothermal Area Exploration Technique Geophysical Techniques Activity Date 1975 Usefulness not indicated DOE-funding Unknown Notes Geologic and geophysics studies were completed at the Raft River valley. References Williams, P.L.; Mabey, D.R.; Pierce, K.L.; Zohdy, A.A.R.; Ackermann, H.; Hoover, D.B. (1 May 1975) Geological and geophysical studies of a geothermal area in the southern Raft river valley, Idaho Retrieved from "http://en.openei.org/w/index.php?title=Geophysical_Method_At_Raft_River_Geothermal_Area_(1975)&oldid=59434

392

Independent Activity Report, Savannah River Site - July 2010 | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Activity Report, Savannah River Site - July 2010 Independent Activity Report, Savannah River Site - July 2010 Independent Activity Report, Savannah River Site - July 2010 July 2010 Savannah River Site Salt Waste Processing Facility Construction Project Review A Department of Energy Construction Project Review (CPR) of the Salt Waste Processing Facility (SWPF) project was conducted on July 19-22, 2010, at the request of the Principal Deputy Secretary, Office of Environmental Management (EM-2). The purpose of the review was to assess the cost, schedule, and technical progress against the approved Performance Baseline. Independent Activity Report, Savannah River Site - July 2010 More Documents & Publications Independent Activity Report, Savannah River Site - September 2010 Independent Activity Report, Savannah River Site - May 2010

393

An Inside Look at River Corridor | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

An Inside Look at River Corridor An Inside Look at River Corridor An Inside Look at River Corridor July 16, 2012 - 1:04pm Addthis "River Corridor" provides viewers with a look at the cleanup of hundreds of contaminated buildings and more than one thousand areas where soil was contaminated along the 50-mile stretch of the Columbia River that flows through the Hanford Site in southeast Washington State. Amanda Scott Amanda Scott Former Managing Editor, Energy.gov In the seventh chapter of The Handford Story, the Energy Department takes a look at the River Corridor -- a 50-mile stretch of the Columbia River that flows through the Hanford site in southeast Washington State. This video provides you with an insiders look at the cleanup of contaminated buildings and soil. Watch the video above to get a look inside the Energy

394

Deep drilling data Raft River geothermal area, Idaho | Open Energy  

Open Energy Info (EERE)

drilling data Raft River geothermal area, Idaho drilling data Raft River geothermal area, Idaho Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Report: Deep drilling data Raft River geothermal area, Idaho Details Activities (2) Areas (1) Regions (0) Abstract: Stratigraphy and geophysical logs of three petroleum test boreholes in the Raft River Valley are presented. The geophysical logs include: temperature, resistivity, spontaneous potential, gamma, caliper, and acoustic logs. Author(s): Oriel, S. S.; Williams, P. L.; Covington, H. R.; Keys, W. S.; Shaver, K. C. Published: DOE Information Bridge, 1/1/1978 Document Number: Unavailable DOI: 10.2172/6272996 Source: View Original Report Exploratory Well At Raft River Geothermal Area (1975) Exploratory Well At Raft River Geothermal Area (1976) Raft River Geothermal Area

395

Geophysical Method At Raft River Geothermal Area (1977) | Open Energy  

Open Energy Info (EERE)

Geophysical Method At Raft River Geothermal Area (1977) Geophysical Method At Raft River Geothermal Area (1977) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geophysical Method At Raft River Geothermal Area (1977) Exploration Activity Details Location Raft River Geothermal Area Exploration Technique Geophysical Techniques Activity Date 1977 Usefulness not indicated DOE-funding Unknown Notes Borehole geophysics were completed at the Raft River valley, Idaho. References Applegate, J.K.; Donaldson, P.R.; Hinkley, D.L.; Wallace, T.L. (1 February 1977) Borehole geophysics evaluation of the Raft River geothermal reservoir, Idaho Retrieved from "http://en.openei.org/w/index.php?title=Geophysical_Method_At_Raft_River_Geothermal_Area_(1977)&oldid=594349" Category: Exploration Activities

396

arXiv:1306.4135v1[hep-ex]18Jun2013 First results on low-mass WIMP from the CDEX-1 experiment  

E-Print Network (OSTI)

Long River Hydropower Development Company, Chengdu 610051 7 Institute of Physics, Academia Sinica, Taipei-contact germanium (PPCGe) detec- tor with a crystal mass of 994 g. The experiment took place in China Jinping

397

EXPERIMENTS MODEL PK-101  

E-Print Network (OSTI)

to Quizzes 3 Introduction to Basic Components 4 Experiment #1: The Light Bulb 8 More About Resistors 10 Detector 17 Introduction to Capacitors 18 Experiment #8: Slow Light Bulb 20 Experiment #9: Small Dominates Light Bulbs 26 Introduction to Transistors 27 Experiment #14: The Electronic Switch 28 Experiment #15

Kachroo, Pushkin

398

SRNL RADIONUCLIDE FIELD LYSIMETER EXPERIMENT: BASELINE CONSTRUCTION AND IMPLEMENTATION  

SciTech Connect

The purpose of this document is to compile information regarding experimental design, facility design, construction, radionuclide source preparation, and path forward for the ten year Savannah River National Laboratory (SRNL) Radionuclide Field Lysimeter Experiment at the Savannah River Site (SRS). This is a collaborative effort by researchers at SRNL and Clemson University. The scientific objectives of this study are to: Study long-term radionuclide transport under conditions more representative of vadose zone conditions than laboratory experiments; Provide more realistic quantification of radionuclide transport and geochemistry in the vadose zone, providing better information pertinent to radioactive waste storage solutions than presently exists; Reduce uncertainty and improve justification for geochemical models such as those used in performance assessments and composite analyses.

Roberts, K.; Kaplan, D.; Bagwell, L.; Powell, B.; Almond, P.; Emerson, H.; Hixon, A.; Jablonski, J.; Buchanan, C.; Waterhouse, T.

2012-10-17T23:59:59.000Z

399

TESTING OF THE RADBALL TECHNOLOGY AT SAVANNAH RIVER NATIONAL LABORATORY  

SciTech Connect

The United Kingdom's National Nuclear Laboratory (NNL) has developed a remote, nonelectrical, radiation-mapping device known as RadBall (patent pending), which offers a means to locate and quantify radiation hazards and sources within contaminated areas of the nuclear industry. Positive results from initial deployment trials in nuclear waste reprocessing plants at Sellafield in the United Kingdom and the anticipated future potential use of RadBall throughout the U.S. Department of Energy Complex have led to the NNL partnering with the Savannah River National Laboratory (SRNL) to further test, underpin, and strengthen the technical performance of the technology. The study completed at SRNL addresses key aspects of the testing of the RadBall technology. The first set of tests was performed at Savannah River Nuclear Solutions Health Physics Instrument Calibration Laboratory (HPICL) using various gamma-ray sources and an x-ray machine with known radiological characteristics. The objective of these preliminary tests was to identify the optimal dose and collimator thickness. The second set of tests involved a highly contaminated hot cell. The objective of this testing was to characterize a hot cell with unknown radiation sources. The RadBall calibration experiments and hot cell deployment were successful in that for each trial radiation tracks were visible. The deployment of RadBall can be accomplished in different ways depending on the size and characteristics of the contaminated area (e.g., a hot cell that already has a crane/manipulator available or highly contaminated room that requires the use of a remote control device with sensor and video equipment to position RadBall). This report also presents SRNL-designed RadBall accessories for future RadBall deployment (a harness, PODS, and robot).

Farfan, E.; Foley, T.

2010-02-10T23:59:59.000Z

400

MEASUREMENT AND PREDICTION OF RADIOLYTIC HYDROGEN PRODUCTION IN DEFENSE WASTE PROCESSING SLURRIES AT SAVANNAH RIVER SITE  

DOE Green Energy (OSTI)

This paper presents results of measurements and predictions of radiolytic hydrogen production rates from two actual process slurries in the Defense Waste Processing Facility (DWPF) at Savannah River Site (SRS). Hydrogen is a flammable gas and its production in nuclear facilities can be a safety hazard if not mitigated. Measurements were made in the Shielded Cells of Savannah River National Laboratory (SRNL) using a sample of Sludge Batch 3 (SB3) currently being processed by the DWPF. Predictions were made using published values for rates of radiolytic reactions producing H{sub 2} in aqueous solutions and the measured radionuclide and chemical compositions of the two slurries. The agreement between measured and predicted results for nine experiments ranged from complete agreement to 24% difference. This agreement indicates that if the composition of the slurry being processed is known, the rate of radiolytic hydrogen production can be reasonably estimated.

Bibler, N; John Pareizs, J; Terri Fellinger, T; Cj Bannochie, C

2007-01-10T23:59:59.000Z

Note: This page contains sample records for the topic "river experi mental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Scenic Rivers Energy Coop | Open Energy Information  

Open Energy Info (EERE)

Scenic Rivers Energy Coop Scenic Rivers Energy Coop Place Wisconsin Utility Id 16740 Utility Location Yes Ownership C NERC Location MRO NERC MRO Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Commercial Power Commercial Commercial Power with Water Heater Load Control Commercial Controlled Electric Loads- Controlled Electric Residential Controlled Electric Loads- Off-Peak Storage Residential Large Power Industrial Large Power with Water Heater Load Control Industrial Multiple Site Single Phase Rate Residential Peak Alert Commercial Residential and Small Commercial Service Residential

402

Rock River Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Wind Farm Wind Farm Jump to: navigation, search Name Rock River Wind Farm Facility Rock River Wind Farm Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Shell Wind Energy Developer SeaWest Energy Purchaser PacifiCorp Location Arlington and Carbon Counties WY Coordinates 41.6996°, -107.003° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.6996,"lon":-107.003,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

403

Reese River Geothermal Project | Open Energy Information  

Open Energy Info (EERE)

Reese River Geothermal Project Reese River Geothermal Project Project Location Information Coordinates 39.034444444444°, -116.67666666667° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.034444444444,"lon":-116.67666666667,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

404

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 17, 2009 December 17, 2009 CX-000810: Categorical Exclusion Determination Ceramic Synthesis and Gas Permeation Measurements in 735-11A CX(s) Applied: B3.6 Date: 12/17/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office December 17, 2009 CX-000809: Categorical Exclusion Determination Cut, Remove and Replace Off-Gas Exhaust Fan #2 and #3 foundation and Replace Air Monitor Fan #1 and #2 CX(s) Applied: B1.3 Date: 12/17/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office December 17, 2009 CX-000808: Categorical Exclusion Determination Howard T. Ricketts Regional Biocontainment Laboratory 134 CX(s) Applied: B3.6 Date: 12/17/2009 Location(s): Aiken, South Carolina

405

Microsoft Word - CX_Okanogan_River.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4, 2012 4, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Dave Roberts Project Manager - KEWU-4 Proposed Action: Provision of funds to the Colville Confederated Tribes for the purchase of two parcels of land along the Okanogan River. Fish and Wildlife Project No.: 2007-224-00 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Transfer of land/habitat preservation, wildlife management. Location: The Okanogan River properties are located south of the town of Omak, in Okanogan County, Washington. Proposed by: Bonneville Power Administration (BPA) and the Colville Confederated Tribes (CCT). Description of the Proposed Action: BPA proposes to fund the acquisition of two properties

406

Hood River Electric Coop | Open Energy Information  

Open Energy Info (EERE)

Hood River Electric Coop Hood River Electric Coop Place Oregon Utility Id 8830 Utility Location Yes Ownership C NERC Location WECC NERC WECC Yes Activity Buying Transmission Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Commercial Commercial Irrigation Commercial Outdoor Lighting 100 watt HPS Light Lighting Outdoor Lighting 200 watt HPS Light Lighting Residential Residential Residential B Residential Residential Three Phase Residential Average Rates Residential: $0.0656/kWh Commercial: $0.0641/kWh Industrial: $0.0522/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a"

407

American River Ventures | Open Energy Information  

Open Energy Info (EERE)

American River Ventures American River Ventures Place Roseville, California Sector Efficiency Product Early-stage venture capital firm, ARV invests in new technologies which provide a platform for a sustainable future, specifically, energy efficiency, energy intelligence and advanced materials. Coordinates 41.865599°, -76.958585° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.865599,"lon":-76.958585,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

408

Salt River Project | Open Energy Information  

Open Energy Info (EERE)

Project Project Jump to: navigation, search Name Salt River Project Place Tempe, Arizona Utility Id 16572 Utility Location Yes Ownership P NERC Location WECC NERC WECC Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes Activity Wholesale Marketing Yes Activity Bundled Services Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] SGIC[2] Energy Information Administration Form 826[3] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Salt River Project Smart Grid Project was awarded $56,859,359 Recovery Act Funding with a total project value of $114,003,719.

409

Twin Rivers Technologies | Open Energy Information  

Open Energy Info (EERE)

Rivers Technologies Rivers Technologies Address 780 Washington Street Place Quincy, Massachusetts Zip 02169 Sector Biofuels Product Developing vegetable oil based biofuels Website http://www.twinriverstechnolog Coordinates 42.2452749°, -70.9698774° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.2452749,"lon":-70.9698774,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

410

Geology of Kuparuk River Oil Field, Alaska  

SciTech Connect

The Kuparuk River Oil Field is located on the Alaskan Arctic North Slope in the Colville-Prudhoe Trough ca. 25 miles west of the Prudhoe Bay Field. The 23 API crude is similar in type to that in the Prudhoe Bay Field. However, the Kuparuk Reservoir is in early Cretaceous clastics of the Kuparuk River Formation, stratigraphically higher than at Prudhoe. The origin of the oil is believed to be predominantly from the Jurassic Kingak formation with migration occurring along the basal Cretaceous unconformity. The dominant trapping mechanism is stratigraphic pinch-out and truncation of the reservoir at an intraformational unconformity along the southern and western flanks of a southeast plunging antiform. Structural dip closure exists along the northern and eastern flanks with a tilted oil-water contact at ca. 6675 ft subsea. The reservoir sandstones occur within cleaning and coarsening-upward sequences which are interpreted as shallow-marine and sublittoral in origin.

Hardwick, P.; Carman, G.R.

1982-05-01T23:59:59.000Z

411

The Savannah River Site's Groundwater Monitoring Program  

Science Conference Proceedings (OSTI)

The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site's Groundwater Monitoring Program. During fourth quarter 1989 (October--December), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. An explanation of flagging criteria for the fourth quarter is presented in the Flagging Criteria section of this document. All analytical results from fourth quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

Not Available

1989-01-01T23:59:59.000Z

412

River Protection Project (RPP) Project Management Plan  

SciTech Connect

The U.S. Department of Energy (DOE), in accordance with the Strom Thurmond National Defense Authorization Act for Fiscal Year 1999, established the Office of River Protection (ORP) to successfully execute and manage the River Protection Project (RPP), formerly known as the Tank Waste Remediation System (TWRS). The mission of the RPP is to store, retrieve, treat, and dispose of the highly radioactive Hanford tank waste in an environmentally sound, safe, and cost-effective manner. The team shown in Figure 1-1 is accomplishing the project. The ORP is providing the management and integration of the project; the Tank Farm Contractor (TFC) is responsible for providing tank waste storage, retrieval, and disposal; and the Privatization Contractor (PC) is responsible for providing tank waste treatment.

SEEMAN, S.E.

2000-04-01T23:59:59.000Z

413

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 16, 2011 May 16, 2011 CX-006405: Categorical Exclusion Determination 707-C Storm Drain Repairs CX(s) Applied: B1.3 Date: 05/16/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office May 13, 2011 CX-006406: Categorical Exclusion Determination Silver Chloride Injection at the F Area Hazardous Waste Management Facilities Barrier Wall CX(s) Applied: B6.9 Date: 05/13/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office May 12, 2011 CX-006407: Categorical Exclusion Determination Removal of Inactive Chromate Water Isolation Valves CRW-V-170 and CRW-V-175 and Installation of 3 Inch Blind Flanges for F-area New Hill CX(s) Applied: B1.3 Date: 05/12/2011 Location(s): Aiken, South Carolina

414

Powder River Energy Corporation | Open Energy Information  

Open Energy Info (EERE)

Jump to: navigation, search Jump to: navigation, search Name Powder River Energy Corporation Place Sundance, Wyoming Website precorp.coop/ Utility Id 19156 Utility Location Yes Ownership C NERC Location WECC Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] SGIC[2] Energy Information Administration Form 826[3] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Powder River Energy Corporation Smart Grid Project was awarded $2,554,807 Recovery Act Funding with a total project value of $5,109,614. Utility Rate Schedules Grid-background.png General Service (GS)-Single Phase Commercial General Service (GS)-Three phase Commercial General Service-Coal Bed Methane (GS-CBM)-Single Phase Commercial

415

Office of River Protection (ORP) and Washingotn River Protection Solutions, LLC (WRPS) Partnering Agreement for the DOE-EM Tank Operations Project  

Energy.gov (U.S. Department of Energy (DOE))

The Mission of the Office of River Protection is to safely retrieve and treat Hanford's tank waste and close the Tank Farms to protect the Columbia River.

416

Operating Experience Summaries  

NLE Websites -- All DOE Office Websites (Extended Search)

Operating Experience Summaries The Office of Health, Safety and Security (HSS) Office of Analysis publishes the Operating Experience Summary to exchange lessons-learned information...

417

STATUS REPORT NO. 4 ON CLINCH RIVER STUDY  

SciTech Connect

The status of radioactive contamination of the Clinch and Tennessee River systems from Nov. 1961 to April 1962 is reviewed. Data are included from studies on the fate of radioactive materials discharged to the Clinch River by the Oak Ridge National Laboratory, the mechanisms of dispersion of radionuclides released to the river, the direct and indirect hazards of waste disposal practices during the period, an evaluation of the over-all usefulness of this river for radioactive disposal purposes, and an evaluation of long-term monitoring procedures. The management of liquid wastes at ORNL is discussed and results are reported from studies on the accumulation and movement of radionuclides in White Oak Creek basin, the contamination of river biota, hydrologic measurements and analyses, measurements of radioactivity in the river system and in community water systems downstream from the Clinch River, and calculation of estimated radiation dosages from drinking Clinch River and Tennessee River water or immersion in the water at various downstream points. Results are included from a preimpoundment study of ecological conditions of Melton Hill Lake and estimates of the effects of Melton Hill Lake and power releases from Melton Hill Dam on hydrologic conditions in the river system. (C.H.)

Morton, R.J. ed.

1963-09-25T23:59:59.000Z

418

STATUS REPORT NO. 1 ON CLINCH RIVER STUDY  

SciTech Connect

A study of the Clinch River below Oak Ridge National Laboratory was initiated in Feb. 1960 to obtain fundamental information on the physical, chemical, and biological dy namics of this fresh-water stream which receives large volumes of low-level radioactive wastes. The fate of radioactive materials discharged to the river, the mechanisms of dispersion of radionuclides released to the river, the direct and indirect hazards of current disposal practice in the river, and the over-all usefulness of this river for radioactive waste disposal purposes will be studied. In formation obtained will have important implications for problems involving large-scale environmental contamination such as the over- all diluent capacity of fresh-water environments for the continuous input of large volume low-level radioactive wastes and the long-term indirect impact of radioactive contamination on such an environment. White Oak Creek, which drains the site ot Oak National Laboratory, flows into the Clinch River, a tributary of the Tennessee River. The Clinch and Tennessee Rivers are described and available data on the physical, chemical, and biological conditions of the rivers are summarized. Data are included from preliminary studies on the properties of water and bottom sediments, studies on radionuclide interactions with minerals and river sediment, biological studies on plants and animals, and hydrologic studies. (C.H.)

Morton, R.J. ed.

1961-08-01T23:59:59.000Z

419

Raft River 5MW Geothermal Pilot Plant  

SciTech Connect

Elements of design of the 5 MW(e) binary cycle plant to be built in the Raft River Valley in Idaho are discussed. Advantages of the dual boiling cycle for use with moderate temperature (250 to 350/sup 0/F) resources are discussed. A breakdown of the heat loads and power requirements is presented. Various components, including pumps, heat exchangers, cooling tower, turbine-generators, and production and injection systems, are described. (JGB)

Whitbeck, J.F.; Piscitella, R.R.

1978-01-01T23:59:59.000Z

420

Groundwater protection EIS: Existing environment: Savannah River  

SciTech Connect

Per Groundwater Protection EIS commitments, a baseline of surface water hydrology and chemistry of each onsite stream is needed to define the existing environment of each watershed so that environmental impacts associated with the various waste site closure options can be assessed. This report summarizes the existing water quality of the Savannah River; lists the various waste sites encompassing this watershed; and summarizes the availability of surface water and floodplain sediment monitoring data, both radiochemical and physiochemical, collected from this watershed.

Stejskal, G.F.

1985-10-25T23:59:59.000Z

Note: This page contains sample records for the topic "river experi mental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Savannah River Technology Center monthly report  

Science Conference Proceedings (OSTI)

This is a monthly report published by Westinghouse Savannah River Company. Topics discussed in this progress report are: Terrazzo reservoir, Replacement Tritium Facility Final Safety Analysis Report, tritium processing and disposal, separation processes, environmental effects and future impacts, laboratory performance evaluation, groundwater characterization, mixed waste management facility, Raman Spectroscopy, waste processing, Defense Waste Processing Facility, mercury recycling, off-gas components testing, incineration facility blowdown solidification, and weld residual stress minimization study.

Ferrell, J.M.

1993-09-01T23:59:59.000Z

422

Fermilab | Science at Fermilab | Experiments & Projects | Experiments...  

NLE Websites -- All DOE Office Websites (Extended Search)

Particle Physics News Image Bank Fermilab in the News Quantum Diaries In this Section: Energy Frontier Intensity Frontier Cosmic Frontier Experiments at the Cosmic Frontier How...

423

Schlumberger soundings in the Upper Raft River and Raft River Valleys, Idaho and Utah  

DOE Green Energy (OSTI)

In 1975, the U.S. Geological Survey made seventy Schlumberger resistivity soundings in the Upper Raft River Valley and in parts of the Raft River Valley. These soundings complement the seventy-nine soundings made previously in the Raft River Valley (Zohdy and others, 1975) and bring the total number of soundings to 149. This work was done as part of a hydrogeologic study of the area. The location, number, and azimuth of all 149 Schlumberger sounding stations are presented. The location of the new stations is shown with solid circles, whereas the location of the previous stations is shown with open circles. The new stations are numbered from 201 to 270. The data and interpretation of the new soundings are presented.

Zohdy, A.A.R.; Bisdorf, R.J.

1976-01-01T23:59:59.000Z

424

Enforcement Letter, Savannah River Ecology Laboratory - June 7, 2000 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Ecology Laboratory - June 7, Savannah River Ecology Laboratory - June 7, 2000 Enforcement Letter, Savannah River Ecology Laboratory - June 7, 2000 June 7, 2000 Issued to Savannah River Ecology Laboratory related to Radioactive Material Control Deficiencies at the Savannah River Site This letter refers to the Department of Energy's (DOE) evaluation of radioactive material control deficiencies occurring at the Savannah River Ecology Laboratory (SREL) in September 1999. During the underlying event, SREL investigators transported radioactive environmental samples from the Ukraine to SREL and University of Georgia facilities without appropriate labeling, monitoring, and controls. These deficiencies were identified in September 1999; however, they were not formally reported to DOE via the Noncompliance Tracking System (NTS) until March 14, 2000. The Office

425

Numerical Modeling At Raft River Geothermal Area (1983) | Open Energy  

Open Energy Info (EERE)

Raft River Geothermal Area (1983) Raft River Geothermal Area (1983) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Numerical Modeling At Raft River Geothermal Area (1983) Exploration Activity Details Location Raft River Geothermal Area Exploration Technique Numerical Modeling Activity Date 1983 Usefulness not indicated DOE-funding Unknown Notes The numerical modeling of the resistivity data is marginal for changes as small as those observed but the results suggest that changes of a few percent could be expected from a fracture zone extending from depth to within 100 m of the surface. References Sill, W. R. (1 September 1983) Resistivity measurements before and after injection Test 5 at Raft River KGRA, Idaho. Final report Retrieved from "http://en.openei.org/w/index.php?title=Numerical_Modeling_At_Raft_River_Geothermal_Area_(1983)&oldid=47387

426

Final Technical Resource Confirmation Testing at the Raft River Geothermal  

Open Energy Info (EERE)

Final Technical Resource Confirmation Testing at the Raft River Geothermal Final Technical Resource Confirmation Testing at the Raft River Geothermal Project, Cassia County, Idaho Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Report: Final Technical Resource Confirmation Testing at the Raft River Geothermal Project, Cassia County, Idaho Details Activities (1) Areas (1) Regions (0) Abstract: Incorporates the results of flow tests for geothermal production and injection wells in the Raft River geothermal field in southern Idaho. Interference testing was also accomplished across the wellfield. Author(s): Glaspey, Douglas J. Published: DOE Information Bridge, 1/30/2008 Document Number: Unavailable DOI: 10.2172/922630 Source: View Original Report Flow Test At Raft River Geothermal Area (2008) Raft River Geothermal Area Retrieved from

427

Sabine River Compact (Multiple States) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sabine River Compact (Multiple States) Sabine River Compact (Multiple States) Sabine River Compact (Multiple States) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Water Buying & Making Electricity Home Weatherization Program Info State Texas Program Type Siting and Permitting Provider Sabine River Compact Commission The Sabine River Compact Commission administers the Sabine River Compact to ensure that Texas receives its equitable share of quality water from the

428

CRAD, Emergency Management - Office of River Protection K Basin Sludge  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of River Protection K Basin Office of River Protection K Basin Sludge Waste System CRAD, Emergency Management - Office of River Protection K Basin Sludge Waste System May 2004 A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a May 2004 assessment of the Emergency Management program at the Office of River Protection K Basin Sludge Waste System. CRADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, Emergency Management - Office of River Protection K Basin Sludge Waste System More Documents & Publications CRAD, Engineering - Office of River Protection K Basin Sludge Waste System

429

Potomac River Project Outage Schedule Clarification | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

River Project Outage Schedule Clarification River Project Outage Schedule Clarification Potomac River Project Outage Schedule Clarification Docket No. EO-05-01. Order No. 202-07-02: Based on the most current information we have for both circuits, the new outage dates are listed below: Outage Duration Feeder Out April 30, 2007 - June 1, 2007 Circuit 1 June 2, 2007 - July 1, 2007 Circuit 2 Potomac River Project Outage Schedule Clarification More Documents & Publications Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) evised plan for transmission outages for the 230 kV circuits PEPCO Comments on Special Environmental Analysis For Actions Taken Under U.S. Department of Energy Emergency Orders Regarding Operation of the Potomac River Generating Station in Alexandria, Virginia

430

Savannah River Site Contractor Receives Project Management Institute Award  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Contractor Receives Project Management Savannah River Site Contractor Receives Project Management Institute Award Savannah River Site Contractor Receives Project Management Institute Award November 15, 2011 - 12:00pm Addthis SRR Bubbler Project Manager Bill Pepper, center, accepts the PMI Project of the Year award from Eloy Saldivar, left, president of the Savannah River Chapter of PMI. DWPF Facility Manager Les Sonnenberg is on the right. SRR Bubbler Project Manager Bill Pepper, center, accepts the PMI Project of the Year award from Eloy Saldivar, left, president of the Savannah River Chapter of PMI. DWPF Facility Manager Les Sonnenberg is on the right. AIKEN, S.C. - The local chapter of the Project Management Institute (PMI) recently honored the Savannah River Site liquid waste contractor with its

431

Enforcement Letter, Westinghouse Savannah River Company - April 15, 1997 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Company - April 15, Savannah River Company - April 15, 1997 Enforcement Letter, Westinghouse Savannah River Company - April 15, 1997 April 15, 1997 Issued to Westinghouse Savannah River Company related to Potential Violations of Quality Assurance and Work Process Requirements at the Savannah River Site On February 11, 1997, the Office of Enforcement and Investigation (EH-10) met with members of your staff and the DOE Savannah River Operations Office (DOE-SR) to review your progress in correcting the noncompliances identified in the subject Noncompliance Tracking System (NTS) reports. A summary of our meeting and assessment of the information provided is enclosed with this letter. Your evaluation of the events and conditions leading to each of the occurrences, reported to EH-10 in the subject NTS reports, has identified

432

Potomac River Project Outage Schedule Clarification | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Potomac River Project Outage Schedule Clarification Potomac River Project Outage Schedule Clarification Potomac River Project Outage Schedule Clarification Docket No. EO-05-01. Order No. 202-07-02: Based on the most current information we have for both circuits, the new outage dates are listed below: Outage Duration Feeder Out April 30, 2007 - June 1, 2007 Circuit 1 June 2, 2007 - July 1, 2007 Circuit 2 Potomac River Project Outage Schedule Clarification More Documents & Publications Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) evised plan for transmission outages for the 230 kV circuits Notification of Planned 230kV Outage at Potomac River Generating Station PEPCO Comments on Special Environmental Analysis For Actions Taken Under U.S. Department of Energy Emergency Orders Regarding Operation of the

433

Independent Activity Report, Savannah River Site - June 2010 | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 2010 June 2010 Independent Activity Report, Savannah River Site - June 2010 June 2010 Savannah River Site Salt Waste Processing Facility Construction Site Orientation Visit The U.S. Department of Energy (DOE) Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), conducted an orientation visit on June 21-25, 2010, at the Salt Waste Processing Facility (SWPF) construction site at the DOE Savannah River Site (SRS). The purpose of the visit was to determine methods for HSS to carry out its independent oversight responsibilities with respect to this project in coordination with DOE's Savannah River Operations Office (DOE-SR). Independent Activity Report, Savannah River Site - June 2010 More Documents & Publications Independent Activity Report, Savannah River Site - May 2010

434

Wabash River Coal Gasification Repowering Project Final Technical Report  

Office of Scientific and Technical Information (OSTI)

Wabash River Coal Gasification Wabash River Coal Gasification Repowering Project Final Technical Report August 2000 Work Performed Under Cooperative Agreement DE-FC21-92MC29310 For: The U.S. Department of Energy Office of Fossil Energy National Energy Technology Laboratory Morgantown, West Virginia Prepared by: The Men and Women of Wabash River Energy Ltd. For Further Information Contact: Roy A. Dowd, CHMM Environmental Supervisor Wabash River Coal Gasification Repowering Project 444 West Sandford Avenue West Terre Haute, IN 47885 LEGAL NOTICE/DISCLAIMER This report was prepared by the Wabash River Coal Gasification Repowering Project Joint Venture pursuant to a Cooperative Agreement partially funded by the U.S. Department of Energy, and neither the Wabash River Coal Gasification Repowering

435

Magnetotellurics At Raft River Geothermal Area (1977) | Open Energy  

Open Energy Info (EERE)

Magnetotellurics At Raft River Geothermal Area (1977) Magnetotellurics At Raft River Geothermal Area (1977) Exploration Activity Details Location Raft River Geothermal Area Exploration Technique Magnetotellurics Activity Date 1977 Usefulness useful DOE-funding Unknown Notes Magnetotelluric soundings along a profile extending from the Raft River geothermal area in southern Idaho in Yellowstone National Park in Wyoming reveal a highly anomalous crustal structure involving a conductive zone at depths that range from 18 km in the central part of the eastern Snake River Plain to 7 km beneath the Raft River thermal area and as little as 5 km in Yellowstone. Resistivities in this conductive zone are less than 10 ohm-m and at some sites than 1 ohm-m. References Stanley, W.D.; Boehl, J.E.; Bostick, F.X.; Smith, H.W. (10 June

436

Independent Oversight Activity Report, Office of River Protection - May  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of River Protection - Office of River Protection - May 2013 Independent Oversight Activity Report, Office of River Protection - May 2013 May 2013 Operational Awareness Visit at the Office of River Protection [HAIR-HANFORD-2013-05-13] The Office of Health, Safety and Security (HSS) Office of Safety and Emergency Management Evaluations (HS-45) Site Lead conducted an operational awareness visit to the Office of River Protection (ORP) to observe contractor efforts to develop a hazards analysis for the Low Activity Waste facility of the Waste Treatment and Immobilization Plant (WTP), tour the WTP construction site, observe ORP's quality assurance audit of the WTP contractor (Bechtel National, Inc.), tour the Hanford Tank Farms, and observe tank waste retrieval operations. Independent Oversight Activity Report, Office of River Protection - May

437

A Milestone for Savannah River Site | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A Milestone for Savannah River Site A Milestone for Savannah River Site A Milestone for Savannah River Site October 21, 2010 - 4:38pm Addthis Employees of the Savannah River Site's M Area Operable Unit (MAOU) gather at the completed site. Employees of the Savannah River Site's M Area Operable Unit (MAOU) gather at the completed site. Dr. Ines Triay I had the privilege yesterday to celebrate history and embrace the future at the first Savannah River Site (SRS) Area Completion under the American Recovery and Reinvestment Act. I was one of about 250 people gathered at the M Area Operable Unit (MAOU) area completion event that marked the end of an era at SRS. During the Cold War, M Area was the site of three support buildings used to fabricate fuel targets for the Site's reactors; home to the Liquid Effluent Treatment

438

MHK Technologies/Microturbine River In Stream | Open Energy Information  

Open Energy Info (EERE)

Microturbine River In Stream Microturbine River In Stream < MHK Technologies Jump to: navigation, search << Return to the MHK database homepage Microturbine River In Stream.png Technology Profile Primary Organization Whitestone Power Communications Project(s) where this technology is utilized *MHK Projects/Microturbine River In Stream Technology Resource Click here Current/Tidal Technology Type Click here Axial Flow Turbine Technology Readiness Level Click here TRL 5/6: System Integration and Technology Laboratory Demonstration Technology Description HDPE blades are the only moving parts in the water.This gives the turbine high resistance to silty or salty water. Blades designed to survive impact of 1500 lb object. HDPE provides flexibility and strength. Blades penetrate water 24 inches allowing for deep and shallow operation. Mounting design allows for variable depth operation for varying river conditions.All submerged prime-mover parts constructed from HDPE. No underwater gearboxes, generators or electrical cables. Velocity of blades 50% of velocity of river current.

439

Preliminary Notice of Violation, Savannah River Nuclear Solutions, LLC -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Preliminary Notice of Violation, Savannah River Nuclear Solutions, Preliminary Notice of Violation, Savannah River Nuclear Solutions, LLC - WEA-2010-05 Preliminary Notice of Violation, Savannah River Nuclear Solutions, LLC - WEA-2010-05 October 7, 2010 Preliminary Notice of Violation issued to Savannah River Nuclear Solutions, LLC related to a Nitric Acid Spill Event and an Electrical Arc Flash Injury Event at the Savannah River Site This letter refers to the Office of Health, Safety and Security's Office of Enforcement investigation into the facts and circumstances surrounding the nitric acid spill event that occurred in F Area on August 18, 2009, and the electrical arc flash injury that occurred in the D Area powerhouse on September 23, 2009, at the Savannah River Site. Based on an evaluation of the evidence in this matter, the U.S. Department of Energy (DOE) has

440

A Milestone for Savannah River Site | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A Milestone for Savannah River Site A Milestone for Savannah River Site A Milestone for Savannah River Site October 21, 2010 - 4:38pm Addthis Employees of the Savannah River Site's M Area Operable Unit (MAOU) gather at the completed site. Employees of the Savannah River Site's M Area Operable Unit (MAOU) gather at the completed site. Dr. Ines Triay I had the privilege yesterday to celebrate history and embrace the future at the first Savannah River Site (SRS) Area Completion under the American Recovery and Reinvestment Act. I was one of about 250 people gathered at the M Area Operable Unit (MAOU) area completion event that marked the end of an era at SRS. During the Cold War, M Area was the site of three support buildings used to fabricate fuel targets for the Site's reactors; home to the Liquid Effluent Treatment

Note: This page contains sample records for the topic "river experi mental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Preliminary Notice of Violation,Savannah River Nuclear Solutions, LLC -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Nuclear Solutions, Savannah River Nuclear Solutions, LLC - NEA-2011-02 Preliminary Notice of Violation,Savannah River Nuclear Solutions, LLC - NEA-2011-02 July 22, 2011 Preliminary Notice of Violation issued to Savannah River Nuclear Solutions, LLC related to a Puncture Wound Injury resulting in a Radiological Uptake at the Savannah River Site This letter refers to the Office of Health, Safety and Security's Office of Enforcement and Oversight investigation into the facts and circumstances associated with the June 14, 2010, employee puncture wound injury, which occurred in the F-TRU Remediation Enclosure within the F-Canyon Facility, at the U.S. Department of Energy' s (DOE) Savannah River Site. This occurrence was reported in Noncompliance Tracking System (NTS) report NTS-SRSO--SRNS-CPWM-20IO-0002, Contaminated Puncture Wound During TRU Drum

442

Independent Activity Report, Savannah River Site - May 2010 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 2010 May 2010 Independent Activity Report, Savannah River Site - May 2010 May 2010 Savannah River Site Salt Waste Processing Facility Construction Site Walkthrough The U.S. Department of Energy (DOE), Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), conducted a visit to the Savannah River Site (SRS) on May 4-5, 2010. The visit focused on the Salt Waste Processing Facility (SWPF) Construction Site, which is managed by Parsons with DOE line management program direction and oversight from the DOE Savannah River Operations Office. Independent Activity Report, Savannah River Site - May 2010 More Documents & Publications Independent Activity Report, Savannah River Site - June 2010 Consent Order, Parsons Infrastructure & Technology Group, Inc. -

443

Enforcement Letter, Savannah River Ecology Laboratory - June 7, 2000 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Ecology Laboratory - June 7, Savannah River Ecology Laboratory - June 7, 2000 Enforcement Letter, Savannah River Ecology Laboratory - June 7, 2000 June 7, 2000 Issued to Savannah River Ecology Laboratory related to Radioactive Material Control Deficiencies at the Savannah River Site This letter refers to the Department of Energy's (DOE) evaluation of radioactive material control deficiencies occurring at the Savannah River Ecology Laboratory (SREL) in September 1999. During the underlying event, SREL investigators transported radioactive environmental samples from the Ukraine to SREL and University of Georgia facilities without appropriate labeling, monitoring, and controls. These deficiencies were identified in September 1999; however, they were not formally reported to DOE via the Noncompliance Tracking System (NTS) until March 14, 2000. The Office

444

Snake River Plain Geothermal Region | Open Energy Information  

Open Energy Info (EERE)

Snake River Plain Geothermal Region Snake River Plain Geothermal Region (Redirected from Snake River Plain) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Snake River Plain Geothermal Region Details Areas (8) Power Plants (1) Projects (2) Techniques (11) Map: {{{Name}}} "The Snake River Plain is a large arcuate structural trough that characterizes the topography of southern Idaho that can be divided into three sections: western, central, and eastern. The western Snake River Plain is a large tectonic graben or rift valley filled with several km of lacustrine (lake) sediments; the sediments are underlain by rhyolite and basalt, and overlain by basalt. The western plain began to form around 11-12 Ma with the eruption of rhyolite lavas and ignimbrites. The western plain is not parallel to North American Plate motion, and lies at a high

445

John C. Barnes of Savannah River Operations named 2012 Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

John C. Barnes of Savannah River Operations named 2012 Facility John C. Barnes of Savannah River Operations named 2012 Facility Representative of the Year John C. Barnes of Savannah River Operations named 2012 Facility Representative of the Year August 20, 2013 - 8:27am Addthis John C. Barnes of Savannah River Operations named 2012 Facility Representative of the Year About 200 Department of Energy (DOE) federal employees are Facility Representatives (FR) who provide day-to-day oversight of contractor operations at DOE facilities. Each year the Department presents the FR of the Year Award to recognize superior service. Mr. John C. Barnes from the Savannah River Operations Office was selected from a field of sixteen nominees as the 2012 DOE FR of the Year. He is responsible for operational oversight of key facilities at the Savannah River Site, including the F and

446

HYDROGEN TECHNOLOGY RESEARCH AT THE SAVANNAH RIVER NATIONAL LABORATORY  

DOE Green Energy (OSTI)

The Savannah River National Laboratory (SRNL) is a U.S. Department of Energy research and development laboratory located at the Savannah River Site (SRS) near Aiken, South Carolina. SRNL has over 50 years of experience in developing and applying hydrogen technology, both through its national defense activities as well as through its recent activities with the DOE Hydrogen Programs. The hydrogen technical staff at SRNL comprises over 90 scientists, engineers and technologists, and it is believed to be the largest such staff in the U.S. SRNL has ongoing R&D initiatives in a variety of hydrogen storage areas, including metal hydrides, complex hydrides, chemical hydrides and carbon nanotubes. SRNL has over 25 years of experience in metal hydrides and solid-state hydrogen storage research, development and demonstration. As part of its defense mission at SRS, SRNL developed, designed, demonstrated and provides ongoing technical support for the largest hydrogen processing facility in the world based on the integrated use of metal hydrides for hydrogen storage, separation, and compression. The SRNL has been active in teaming with academic and industrial partners to advance hydrogen technology. A primary focus of SRNL's R&D has been hydrogen storage using metal and complex hydrides. SRNL and its Hydrogen Technology Research Laboratory have been very successful in leveraging their defense infrastructure, capabilities and investments to help solve this country's energy problems. SRNL has participated in projects to convert public transit and utility vehicles for operation using hydrogen fuel. Two major projects include the H2Fuel Bus and an Industrial Fuel Cell Vehicle (IFCV) also known as the GATOR{trademark}. Both of these projects were funded by DOE and cost shared by industry. These are discussed further in Section 3.0, Demonstration Projects. In addition to metal hydrides technology, the SRNL Hydrogen group has done extensive R&D in other hydrogen technologies, including membrane filters for H2 separation, doped carbon nanotubes, storage vessel design and optimization, chemical hydrides, hydrogen compressors and hydrogen production using nuclear energy. Several of these are discussed further in Section 2, SRNL Hydrogen Research and Development.

Danko, E

2009-03-02T23:59:59.000Z

447

South Fork Clearwater River Habitat Enhancement, Nez Perce National Forest.  

SciTech Connect

In 1984, the Nez Perce National forest and the Bonneville Power Administration entered into a contractual agreement which provided for improvement of spring chinook salmon and summer steelhead trout habitat in south Fork Clearwater River tributaries. Project work was completed in seven main locations: Crooked River, Red River, Meadow Creek Haysfork Gloryhole, Cal-Idaho Gloryhole, Fisher Placer and Leggett Placer. This report describes restoration activities at each of these sites.

Siddall, Phoebe

1992-04-01T23:59:59.000Z

448

Provides leadership for a national program to increase knowledge and advance effective strategies to deal with problems and issues in the promotion of mental health and the prevention and treatment of mental illness;  

E-Print Network (OSTI)

and supports mental health services research concerned with the impact of the organization, financing, and management of health services on the quality, cost, access to, and outcomes of care; · Provides assistance to to deal with problems and issues in the promotion of mental health and the prevention and treatment

Bandettini, Peter A.

449

Delaware River Basin Commission (Multiple States) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Delaware River Basin Commission (Multiple States) Delaware River Basin Commission (Multiple States) Delaware River Basin Commission (Multiple States) < Back Eligibility Utility Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Installer/Contractor Rural Electric Cooperative Tribal Government Systems Integrator Savings Category Water Buying & Making Electricity Home Weatherization Program Info Start Date 1961 State Delaware Program Type Environmental Regulations Siting and Permitting Provider Project Review Section The Delaware River Basin Commission (DRBC) is a federal-interstate compact government agency that was formed by concurrent legislation enacted in 1961 by the United States and the four basin states (Pennsylvania, New York, New

450

Independent Oversight Review, Savannah River Field Office Tritium  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Field Office Tritium Field Office Tritium Facilities - November 2013 Independent Oversight Review, Savannah River Field Office Tritium Facilities - November 2013 November 13, 2013 Review of Savannah River Field Office Tritium Facilities Radiological Controls Activity-Level Implementation This report documents the results of an independent oversight review of the radiological protection program at the Savannah River Site (SRS) tritium facilities implemented at the activity-level by Savannah River Nuclear Solutions, LLC and its subcontractors. The review was performed by the Office of Health, Safety and Security's Office of Safety and Emergency Management Evaluations within the broader context of an ongoing program of targeted assessments of radiological control programs, with an emphasis on

451

Workforce Statistics - Savannah River Field Office | National Nuclear  

National Nuclear Security Administration (NNSA)

Savannah River Field Office | National Nuclear Savannah River Field Office | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Workforce Statistics - Savannah River Field Office Home > About Us > Our Operations > Management and Budget > Office of Civil Rights > Workforce Statistics > Workforce Statistics - Savannah River Field

452

River Restoration for a Socially and Ecologically Devastated Border City  

E-Print Network (OSTI)

Devastated Border Cit Noah Friedman LA222 Introduction Thea case for intervention nOah frodman the t i j u a n a river

Friedman, Noah

2008-01-01T23:59:59.000Z

453

Lumbee River EMC - Solar Water Heating Loan Program (North Carolina...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Loan Program (North Carolina) Lumbee River EMC - Solar Water Heating Loan Program (North Carolina) < Back Eligibility Residential Savings Category Heating & Cooling Solar Water...

454

Lumbee River EMC - Solar Water Heating Rebate Program (North...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rebate Program (North Carolina) Lumbee River EMC - Solar Water Heating Rebate Program (North Carolina) < Back Eligibility Residential Savings Category Heating & Cooling Solar Water...

455

Independent Oversight Review, Savannah River Site- June 2012  

Energy.gov (U.S. Department of Energy (DOE))

Review of Electrical System Configuration Management, Safety Instrumented System Commercial Grade Dedication, Setpoint Calculations, and Software Testing at the Savannah River Site, Waste Solidification Building Project

456

Independent Activity Report, Washington River Protection Solutions, LLC -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solutions, Solutions, LLC - October 2011 Independent Activity Report, Washington River Protection Solutions, LLC - October 2011 October 2011 Industrial Hygiene Surveillance of the Washington River Protection Solutions, LLC Industrial Hygiene Program Strategy and Implementation of the Hanford Concerns Council Recommendations [HIAR-ORP-2011-10-26] Staff from the U.S. Department of Energy's (DOE) Office of Enforcement and Oversight, within the Office of Health, Safety and Security (HSS), in coordination with the Office of River Protection (ORP), reviewed the status and programmatic health of the Washington River Protection Solutions, LLC (WRPS) industrial hygiene program relative to the Hanford Concerns Council (HCC) Independent Review Panel (IRP) report on Chemical Vapors Industrial

457

The investigation of anomalous magnetization in the Raft River valley,  

Open Energy Info (EERE)

investigation of anomalous magnetization in the Raft River valley, investigation of anomalous magnetization in the Raft River valley, Idaho Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Conference Proceedings: The investigation of anomalous magnetization in the Raft River valley, Idaho Details Activities (1) Areas (1) Regions (0) Abstract: Cassia County Idaho; clastic sediments; economic geology; exploration; geophysical methods; geophysical surveys; geothermal energy; gravel; ground methods; Idaho; isothermal remanent magnetization; magnetic anomalies; magnetic methods; magnetic properties; magnetic susceptibility; magnetization; paleomagnetism; Raft River basin; remanent magnetization; sediments; surveys; United States Author(s): Anderson, L.A.; Mabey, D.R. Published: Abstracts - Society of Exploration Geophysicists International

458

Petrography of late cenozoic sediments, Raft River geothermal field, Idaho  

Open Energy Info (EERE)

of late cenozoic sediments, Raft River geothermal field, Idaho of late cenozoic sediments, Raft River geothermal field, Idaho Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Conference Proceedings: Petrography of late cenozoic sediments, Raft River geothermal field, Idaho Details Activities (1) Areas (1) Regions (0) Abstract: GEOTHERMAL ENERGY; RAFT RIVER VALLEY; GEOTHERMAL FIELDS; PETROGRAPHY; BIOTITE; CALCITE; CLAYS; LIMESTONE; PYRITE; SANDSTONES; SEDIMENTS; SHALES; VOLCANIC ROCKS; ZEOLITES; ALKALINE EARTH METAL COMPOUNDS; CALCIUM CARBONATES; CALCIUM COMPOUNDS; CARBON COMPOUNDS; CARBONATE ROCKS; CARBONATES; CHALCOGENIDES; IDAHO; IGNEOUS ROCKS; INORGANIC ION EXCHANGERS; ION EXCHANGE MATERIALS; IRON COMPOUNDS; IRON SULFIDES; MICA; MINERALS; NORTH AMERICA; ORES; OXYGEN COMPOUNDS; PACIFIC NORTHWEST REGION; PYRITES; ROCKS; SEDIMENTARY ROCKS; SULFIDES; SULFUR COMPOUNDS;

459

Ohio River Greenway Development Commission (Indiana) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ohio River Greenway Development Commission (Indiana) Ohio River Greenway Development Commission (Indiana) Ohio River Greenway Development Commission (Indiana) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Indiana Program Type Environmental Regulations Siting and Permitting Provider Ohio River Greenway Commission

460

River Basins Advisory Commissions (South Carolina) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

River Basins Advisory Commissions (South Carolina) River Basins Advisory Commissions (South Carolina) River Basins Advisory Commissions (South Carolina) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State South Carolina Program Type Environmental Regulations Provider Catawba Wateree River Basin Advisory Commission

Note: This page contains sample records for the topic "river experi mental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Borehole geophysics evaluation of the Raft River geothermal reservoir,  

Open Energy Info (EERE)

reservoir, reservoir, Idaho Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Journal Article: Borehole geophysics evaluation of the Raft River geothermal reservoir, Idaho Details Activities (1) Areas (1) Regions (0) Abstract: GEOTHERMAL ENERGY; GEOTHERMAL FIELDS; GEOPHYSICAL SURVEYS; RAFT RIVER VALLEY; GEOTHERMAL EXPLORATION; BOREHOLES; EVALUATION; HOT-WATER SYSTEMS; IDAHO; MATHEMATICAL MODELS; WELL LOGGING; CAVITIES; EXPLORATION; GEOTHERMAL SYSTEMS; HYDROTHERMAL SYSTEMS; NORTH AMERICA; PACIFIC NORTHWEST REGION; USA Author(s): Applegate, J.K.; Donaldson, P.R.; Hinkley, D.L.; Wallace, T.L. Published: Geophysics, 2/1/1977 Document Number: Unavailable DOI: Unavailable Source: View Original Journal Article Geophysical Method At Raft River Geothermal Area (1977) Raft River Geothermal Area

462

Missouri River Energy Services (23 Member Cooperatives) - Business Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Missouri River Energy Services (23 Member Cooperatives) - Business Missouri River Energy Services (23 Member Cooperatives) - Business Energy Efficiency Rebate Missouri River Energy Services (23 Member Cooperatives) - Business Energy Efficiency Rebate < Back Eligibility Commercial Savings Category Heating & Cooling Commercial Heating & Cooling Heating Cooling Manufacturing Other Appliances & Electronics Heat Pumps Commercial Lighting Lighting Water Heating Program Info State Minnesota Program Type Utility Rebate Program Rebate Amount Varies by technology Provider Missouri River Energy Solutions Bright Energy Solutions offers energy efficiency cash incentive programs to [http://www.dsireusa.org/incentives/incentive.cfm?Incentive_Code=MN170F&r... residential] and business customers of municipal utilities that are members

463

NETL: News Release - Great River Energy Unveils Prototype Module...  

NLE Websites -- All DOE Office Websites (Extended Search)

August 9, 2005 Great River Energy Unveils Prototype Module Coal Dryer Novel Technology Expected to Improve Marketability and Environmental Performance of High-Moisture Coal...

464

Elk River, Idaho: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Edit with form History Share this page on Facebook icon Twitter icon Elk River, Idaho: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates...

465

Priest River, Idaho: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

with form History Share this page on Facebook icon Twitter icon Priest River, Idaho: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates...

466

PIA - Savannah River Nuclear Solution SRNS Electronic Document...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management System (HRMS) PIA - Savannah River Nuclear Solution (SRNS) MedGate Occupational Health and Safety Medical System (OHS) (Includes the Drug and Alcohol Testing...

467

PIA - Savannah River Nuclear Solution (SRNS) MedGate Occupational...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MedGate Occupational Health and Safety Medical System (OHS) (Includes the Drug and Alcohol Testing System (Assistant)) PIA - Savannah River Nuclear Solution (SRNS) MedGate...

468

PIA - Savannah River Nuclear Solution (SRNS) Procurement Cycle...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management System (HRMS) PIA - Savannah River Nuclear Solution (SRNS) MedGate Occupational Health and Safety Medical System (OHS) (Includes the Drug and Alcohol Testing...

469

PIA - Savannah River Nuclear Solutions (SRNS) Human Resource...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Procurement Cycle System (PCS) PIA - Savannah River Nuclear Solution (SRNS) MedGate Occupational Health and Safety Medical System (OHS) (Includes the Drug and Alcohol Testing...

470

Columbia River PUD - Commercial Lighting Retrofit Program (Oregon...  

Open Energy Info (EERE)

Share this page on Facebook icon Twitter icon Columbia River PUD - Commercial Lighting Retrofit Program (Oregon) This is the approved revision of this page, as well as...

471

from Savannah River Nuclear Solutions, LLC NEWS SRNS Education...  

NLE Websites -- All DOE Office Websites (Extended Search)

the CSRA AIKEN, S.C. (August 23, 2012) - As another school year begins, Savannah River Nuclear Solutions, LLC Education Outreach Programs (EOP) prepares for another year of...

472

U.S. DEPARTMENT OF ENERGY * SAVANNAH RIVER ...  

NLE Websites -- All DOE Office Websites (Extended Search)

Boron-structured Nano-proportional Counters for Neutron Detection Scientists at the Savannah River National Laboratory (SRNL) have explored the use of nanotechnology to improve the...

473

Behavior and survival of fish migrating downstream in regulated rivers.  

E-Print Network (OSTI)

??Dams present obstacles to fish migrating between freshwater and marine habitats. This thesis evaluated downstream migrations of fish in five rivers in Sweden and North (more)

Ferguson, John

2008-01-01T23:59:59.000Z

474

DOE Selects Savannah River Remediation, LLC for Liquid Waste...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2009. Savannah River Remediation, LLC is a limited liability company consisting of URS Washington Division; Babcock & Wilcox Technical Services Group, Inc.; Bechtel National,...

475

Savannah River Site Fire Protection engineers work in the community...  

National Nuclear Security Administration (NNSA)

work in the community Posted By Office of Public Affairs Members of the Savannah River Tritium Enterprise's Fire Protection department have taken their expertise out into the local...

476

Savannah River maintains safety focus through multiple tasks...  

National Nuclear Security Administration (NNSA)

focus through multiple tasks Posted By Office of Public Affairs The Savannah River Tritium Enterprise took advantage of a recent multi-week outage to safely complete a...

477

2020 Electric Car Exterior Design for Pearl River Delta Region.  

E-Print Network (OSTI)

??Pearl River Delta (PRD) is one of the fastest economic development regions in China. The big cities in PRD attract a great many young high-educated (more)

Zhu, H.

2012-01-01T23:59:59.000Z

478

Powder River Basin (WY, MT) Coal and Coalbed Methane: Evaluating...  

Open Energy Info (EERE)

Powder River Basin (WY, MT) Coal and Coalbed Methane: Evaluating and Revising 100 Years of Studies The USGS published a USGS Professional Paper in 2010 entitled

479

Powder River Basin (WY, MT) Coal and Coalbed Methane: Evaluating...  

Open Energy Info (EERE)

Search Share this page on Facebook icon Twitter icon Powder River Basin (WY, MT) Coal and Coalbed Methane: Evaluating and Revising 100 Years of Studies Dataset Summary...

480

EA-1671: Big River Substation to Poston Substation 69-Kilovolt...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Line Project, Arizona and California EA-1671: Big River Substation to Poston Substation 69-Kilovolt Transmission Line Project, Arizona and California Summary The...

Note: This page contains sample records for the topic "river experi mental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Microsoft Word - Tualatin_River_Pipeline_Crossing_Site_LURR_19940060...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Memorandum Julie Goodrich - TERR-3 Project Manager Proposed Action: Tualatin River Pipeline Crossing Site - Monitoring Well Redevelopment Categorical Exclusion Applied (from...

482

Ground Gravity Survey At Raft River Geothermal Area (1978) |...  

Open Energy Info (EERE)

Activity Details Location Raft River Geothermal Area Exploration Technique Ground Gravity Survey Activity Date 1978 Usefulness not indicated DOE-funding Unknown Exploration...

483

Exploring the Raft River geothermal area, Idaho, with the dc...  

Open Energy Info (EERE)

Home Journal Article: Exploring the Raft River geothermal area, Idaho, with the dc resistivity method (Abstract) edit Details Activities (1) Areas (1) Regions (0)...

484

DC Resistivity Survey (Schlumberger Array) At Raft River Geothermal...  

Open Energy Info (EERE)

Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon DC Resistivity Survey (Schlumberger Array) At Raft River Geothermal Area (1974-1975) Jump...

485

Department of Energy Awards Hanford River Corridor Contract To...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

River Corridor Contract To Washington Closure, LLC March 23, 2005 - 10:56am Addthis WASHINGTON, DC - U.S. Energy Secretary Samuel Bodman today announced that Washington...

486

Environmental Justice and Fish Consumption Advisories on the Detroit River.  

E-Print Network (OSTI)

??The Detroit River serves as a source of recreation, food, transportation and is an international demarcation. Decades of industrial and municipal pollution have threatened this (more)

Kalkirtz, Victoria; Martinez, Michelle

2008-01-01T23:59:59.000Z

487

Record of Decision for the Savannah River Site Spent Nuclear...  

NLE Websites -- All DOE Office Websites (Extended Search)

Management Final Environmental Impact Statement, Aiken, SC AGENCY: Department of Energy (DOE). ACTION: Record of decision. SUMMARY: The Savannah River Site Spent Nuclear Fuel...

488

Simulation analysis of the unconfined aquifer, Raft River Geothermal...  

Open Energy Info (EERE)

Simulation analysis of the unconfined aquifer, Raft River Geothermal Area, Idaho-Utah Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Report: Simulation analysis of...

489

GEOLOGY AND HYDROTHERMAL ALTERATION OF THE RAFT RIVER GEOTHERMAL...  

Open Energy Info (EERE)

GEOLOGY AND HYDROTHERMAL ALTERATION OF THE RAFT RIVER GEOTHERMAL SYSTEM, IDAHO Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Conference Proceedings: GEOLOGY AND...

490

FLUID GEOCHEMISTRY AT THE RAFT RIVER GEOTHERMAL FIELD, IDAHO...  

Open Energy Info (EERE)

FLUID GEOCHEMISTRY AT THE RAFT RIVER GEOTHERMAL FIELD, IDAHO- NEW DATA AND HYDROGEOLOGICAL IMPLICATIONS Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Conference...

491

Hydrochemistry of selected parameters at the Raft River KGRA...  

Open Energy Info (EERE)

Hydrochemistry of selected parameters at the Raft River KGRA, Cassia County, Idaho Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Report: Hydrochemistry of selected...

492

Final Technical Resource Confirmation Testing at the Raft River...  

Open Energy Info (EERE)

Resource Confirmation Testing at the Raft River Geothermal Project, Cassia County, Idaho Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Report: Final Technical...

493

Total field aeromagnetic map of the Raft River known Geothermal...  

Open Energy Info (EERE)

field aeromagnetic map of the Raft River known Geothermal Resource Area, Idaho by the US Geological Survey Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Report:...

494

The investigation of anomalous magnetization in the Raft River...  

Open Energy Info (EERE)

anomalous magnetization in the Raft River valley, Idaho Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Conference Proceedings: The investigation of anomalous...

495

Borehole geophysics evaluation of the Raft River geothermal reservoir...  

Open Energy Info (EERE)

reservoir, Idaho Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Journal Article: Borehole geophysics evaluation of the Raft River geothermal reservoir, Idaho Details...

496

Rheological control on the initial geometry of the Raft River...  

Open Energy Info (EERE)

Rheological control on the initial geometry of the Raft River detachment fault and shear zone, western United States Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home...

497

Review of the Savannah River Site Tritium Facilities Implementation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Tritium Facilities Implementation Verification Review Processes June 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and...

498

Review of Safety Basis Development for the Savannah River Site...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Subject: Review of Safety Basis Development for the Savannah River Site Salt Waste Processing Facility - Inspection Criteria, Approach, and Line: HS: Rev:...

499

Stretches of Upper Mississippi River near record-low levels ...  

U.S. Energy Information Administration (EIA)

As a result of last year's drought, stretches of the Upper Mississippi River have approached record lows. These low water levels have jeopardized commercial barge ...

500

2011 Annual Planning Summary for Savannah River Operations Office (SRS)  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Savannah River Operations Office (SRS) (See also Environmental Management).