Sample records for river company aiken

  1. Environmental Survey preliminary report, Savannah River Plant, Aiken, South Carolina

    SciTech Connect (OSTI)

    Not Available

    1987-08-01T23:59:59.000Z

    This report contains the preliminary findings based on the first phase of an Environmental Survey at the Department of Energy (DOE) Savannah River Plant (SRP), located at Aiken, South Carolina. The Survey is being conducted by DOE's Office of Environment, Safety and Health. The following topics are discussed: general site information; air, soil, surface water and ground water; hydrogeology; waste management; toxic and chemical materials; release of tritium oxides; radioactivity in milk; contamination of ground water and wildlife; pesticide use; and release of radionuclides into seepage basins. 149 refs., 44 figs., 53 tabs.

  2. EIS-0120: Waste Management Activities for Groundwater Protection, Savannah River Plant, Aiken, South Carolina

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy has prepared this environmental impact statement to assess the environmental consequences of the implementation of modified waste management activities for hazardous, low-level radioactive, and mixed wastes for the protection of groundwater, human health, and the environment at its Savannah River Plant in Aiken, South Carolina.

  3. EIS-0120: Waste Management Activities for Groundwater Protection, Savannah River Plant, Aiken, SC

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy has prepared this environmental impact statement to assess the environmental consequences of the implementation of modified waste management activities for hazardous, low-level radioactive, and mixed wastes for the protection of groundwater, human health, and the environment at its Savannah River Plant in Aiken, South Carolina.

  4. Biological monitoring of Upper Three Runs Creek, Savannah River Plant, Aiken County, South Carolina

    SciTech Connect (OSTI)

    Specht, W.L.

    1991-10-01T23:59:59.000Z

    In anticipation of the fall 1988 start up of effluent discharges into Upper Three Creek by the F/H Area Effluent Treatment Facility of the Savannah River Site, Aiken, SC, a two and one half year biological study was initiated in June 1987. Upper Three Runs Creek is an intensively studied fourth order stream known for its high species richness. Designed to assess the potential impact of F H area effluent on the creek, the study includes qualitative and quantitative macroinvertebrate stream surveys at five sites, chronic toxicity testing of the effluent, water chemistry and bioaccumulation analysis. This final report presents the results of both pre-operational and post-operational qualitative and quantitative (artificial substrate) macroinvertebrate studies. Six quantitative and three qualitative studies were conducted prior to the initial release of the F/H ETF effluent and five quantitative and two qualitative studies were conducted post-operationally.

  5. Determination of transport parameters of coincident inorganic and organic plumes in the Savannah River Plant M-Area, Aiken, South Carolina

    E-Print Network [OSTI]

    Cauffman, Toya Lyn

    1987-01-01T23:59:59.000Z

    DETERMINATION OF TRANSPORT PARAMETERS OF COINCIDENT INORGANIC AND ORGANIC PLUMES IN THE SAVANNAH RIVER PLANT M-AREA, AIKEN, SOUTH CAROLINA A Thesis by TOYA. LYN CAUFFMAN Submitted to the Graduate College of Texas A&M University in partial... fulfillment of the requirements for the degree of MASTER OF SCIENCE December 1987 Major Subject: Geology DETERMINATION OF TRANSPORT PARAMETERS OF COINCIDENT INORGANIC AND ORGANIC PLUMES IN THE SAVANNAH RIVER PLANT M-AREA, AIKEN& SOUTH CAROLINA A Thesis...

  6. Office of Inspector General audit report on Westinghouse Savannah River Company`s health benefit plan

    SciTech Connect (OSTI)

    NONE

    1999-01-01T23:59:59.000Z

    Westinghouse Savannah River Company (Westinghouse) manages and operates the Savannah River Site, located in Aiken, South Carolina, for the US Department of Energy (Department). Westinghouse was self-insured for health benefits and contracted with Aetna Insurance to administer the plan (service payments to providers) from Calendar Year (CY) 1989 through 1996. Westinghouse`s administrative service contract with Aetna Insurance expired on December 31, 1996. Westinghouse chose Blue Cross/Blue Shield of South Carolina (BC/BS) to administer its health plan, effective January 1, 1997. After the contract was awarded to BC/BS, 47 health care providers in the Aiken area submitted their resignations as preferred providers for BC/BS. The health care providers complained that the fees received from BC/BS were less than they were previously paid through Aetna Insurance. As a result, Westinghouse instructed BC/BS to negotiate a modified fee schedule for all the health care providers in the Aiken area. The audit objective was to determine whether the health benefit costs incurred by Westinghouse under the BC/BS contract were necessary and reasonable.

  7. EIS-0023: Long-Term Management of Defense High-Level Radioactive Wastes (Research and Development Program for Immobilization), Savannah River Plant, Aiken, South Carolina

    Broader source: Energy.gov [DOE]

    This environmental impact statement (EIS) analyzes the environmental implications of the proposed continuation of a large Federal research and development (R&D) program directed toward the immobilization of the high-level radioactive wastes resulting from chemical separations operations for defense radionuclides production at the DOE Savannah River Plant (SRP) near Aiken, South Carolina.

  8. Enforcement Letter, Westinghouse Savannah River Company - November...

    Broader source: Energy.gov (indexed) [DOE]

    Savannah River Site On November 14, 2003, the U.S. Department of Energy (DOE) issued a nuclear safety Enforcement Letter to Westinghouse Savannah River Company related to...

  9. Savannah River Operations Office P.O. Box A Aiken, South Carolina 29802

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of ScienceandMesa del Sol HomeFacebook Twitter Principal Investigators PostdoctoralSashaAiken, South

  10. Savannah River Operations Office P.O. Box A Aiken. South Carolina 29802

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of ScienceandMesa del Sol HomeFacebook Twitter Principal Investigators PostdoctoralSashaAiken,

  11. Superfund Record of Decision (EPA Region 4): Savannah River Site (USDOE), Operable Unit 5, Aiken, SC, March 27, 1997

    SciTech Connect (OSTI)

    NONE

    1997-11-01T23:59:59.000Z

    This decision document presents the selected remedial action for the Gunsite 113 Access Road Unit located at the Savannah River Site near Aiken, South Carolina. Based on the results of the remedial investigation, no action is necessary at the Gunsite 113 Access Road Unit to ensure the protection of human health and the environment. Since the Gunsite 113 Access Road Unit poses no threat to human health or the environment, and no action is needed, the CERCLA Section 121 requirements are not applicable. This action is protective of human health and the environment and is meant to be a permanent solution, final action, for the Gunsite 113 Access Road Unit. No five-year remedy review is needed or will be performed.

  12. Biological monitoring of Upper Three Runs Creek, Savannah River Site, Aiken County, South Carolina, March 1990--July 1991

    SciTech Connect (OSTI)

    Not Available

    1991-12-01T23:59:59.000Z

    In anticipation of the fall 1988 start up of effluent discharges into Upper Three Runs Creek by the F/H Area Effluent Treatment Facility of the Savannah River Site, Aiken, SC, a two and one half year biological study was initiated in June 1987. Upper Three Runs Creek is an intensively studied fourth order stream known for its high species richness. Designed to assess the potential impact of F/H area effluent on the creek, the study included qualitative and quantitative macroinvertebrate stream surveys at five sites (see map), chronic toxicity testing of the effluent, water chemistry and bioaccumulation analysis. In a March 1990 study of the potential impact of F/H Area effluent on the macroinvertebrate communities of Upper Three Runs Creek was extended, with reductions in the number of sites to be sampled and in the frequency of water chemistry sampling. This report presents the results of macroinvertebrate stream surveys at three sites, chronic toxicity testing of the effluent and water chemistry analysis of the three stream sites and the effluent from March 1990 to July 1991.

  13. EIS-0108: L-Reactor Operation, Savannah River Plant, Aiken, South Carolina

    Broader source: Energy.gov [DOE]

    This Environmental Impact Statement (EIS) was prepared to provide environmental input into the proposed decision to restart L-Reactor operation at the Savannah River Plant (SRP). The Savannah River Plant is a major U.S. Department of Energy (DOE) installation for the production of defense nuclear materials. The proposed restart of L–Reactor would provide defense nuclear materials (i.e. , plutonium) to wet current and near-term needs for national defense purposes.

  14. EIS-0121: Alternative Cooling Water Systems, Savannah River Plant, Aiken, South Carolina

    Broader source: Energy.gov [DOE]

    The purpose of this Environmental Impact Statement (EIS) is to provide environmental input into the selection and implementation of cooling water systems for thermal discharges from K– and C-Reactors and from a coal-fired powerhouse in the D-Area at the Savannah River Plant (SRP)

  15. An aerial radiological survey of the Central Savannah River Site, Aiken, South Carolina

    SciTech Connect (OSTI)

    Feimster, E.L.

    1991-09-01T23:59:59.000Z

    An aerial radiological survey was conducted over a 194-square- kilometer (75-square-mile) area encompassing the central portion of the Savannah River Site (SRS). The survey was flown during February 10--27, 1987. These radiological measurements were used as baseline data for the central area and for determining the extent of man-made radionuclide distribution. Previous SRS surveys included small portions of the area; the 1987 survey was covered during the site- wide survey conducted in 1979. Man-made radionuclides (including cobalt-60, cesium-137, protactinium-234m, and elevated levels of uranium-238 progeny) that were detected during the survey were typical of those produced by the reactor operations and material processing activities being conducted in the area. The natural terrestrial radiation levels were consistent with those measured during prior surveys of other SRS areas. 1 refs., 4 figs.

  16. Minimizing Characterization - Derived Waste at the Department of Energy Savannah River Site, Aiken, South Carolina

    SciTech Connect (OSTI)

    Van Pelt, R. S.; Amidon, M. B.; Reboul, S. H.

    2002-02-25T23:59:59.000Z

    Environmental restoration activities at the Department of Energy Savannah River Site (SRS) utilize innovative site characterization approaches and technologies that minimize waste generation. Characterization is typically conducted in phases, first by collecting large quantities of inexpensive data, followed by targeted minimally invasive drilling to collect depth-discrete soil/groundwater data, and concluded with the installation of permanent multi-level groundwater monitoring wells. Waste-reducing characterization methods utilize non-traditional drilling practices (sonic drilling), minimally intrusive (geoprobe, cone penetrometer) and non-intrusive (3-D seismic, ground penetration radar, aerial monitoring) investigative tools. Various types of sensor probes (moisture sensors, gamma spectroscopy, Raman spectroscopy, laser induced and X-ray fluorescence) and hydrophobic membranes (FLUTe) are used in conjunction with depth-discrete sampling techniques to obtain high-resolution 3-D plume profiles. Groundwater monitoring (short/long-term) approaches utilize multi-level sampling technologies (Strata-Sampler, Cone-Sipper, Solinst Waterloo, Westbay) and low-cost diffusion samplers for seepline/surface water sampling. Upon collection of soil and groundwater data, information is portrayed in a Geographic Information Systems (GIS) format for interpretation and planning purposes. At the SRS, the use of non-traditional drilling methods and minimally/non intrusive investigation approaches along with in-situ sampling methods has minimized waste generation and improved the effectiveness and efficiency of characterization activities.

  17. Persistent source influences on the trailing edge of a groundwater plume, and natural attenuation timeframes: The F-Area Savannah River Site

    E-Print Network [OSTI]

    Wan, J.

    2013-01-01T23:59:59.000Z

    and FSB-110D; Savannah River National Laboratory: Aiken, SC,Berkeley CA Savannah River National Laboratory (SRNL), Aiken

  18. Intensive archaeological survey of the F/H Surface Enhancement Project Area, Savannah River Site, Aiken and Barnwell Counties, South Carolina

    SciTech Connect (OSTI)

    Sassaman, K.E.; Gillam, J.C.

    1993-08-01T23:59:59.000Z

    Twelve archaeological sites and four artifact occurrences were located by intensive survey of two tracts of land for the F and H Surface Enhancement Project on the Savannah River Site, Aiken and Barnwell Counties, South Carolina. Fieldwork in the 480-acre project area included surface reconnaissance of 3.6 linear kilometers of transects, 140 shovel tests along 4.2 linear kilometers of transects, an additional 162 shovel tests at sites and occurrences, and the excavation of six l {times} 2 m test units. All but one of the sites contained artifacts of the prehistoric era; the twelfth site consists of the remains of a twentieth-century home place. The historic site and six of the prehistoric sites consist of limited and/or disturbed contexts of archaeological deposits that have little research potential and are therefore considered ineligible for nomination to the National Register of Historic Places (NRHP). The remaining five sites have sufficient content and integrity to yield information important to ongoing investigations into upland site use. These sites (38AK146, 38AK535, 38AK539, 38AK541, and 38AK543) are thus deemed eligible for nomination to the NRHP and the Savannah River Archaeological Research Program (SRARP) recommends that they be preserved through avoidance or data recovery.

  19. EA-1605: Biomass Cogeneration and Heating Facilities at the Savannah River Site; Aiken, Allendale and Barnwell Counties, South Carolina

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) prepared this environmental assessment (EA) to analyze the potential environmental impacts of the proposed construction and operation of new biomass cogeneration and heating facilities at the Savannah River Site (SRS).

  20. Wisconsin River Power Company | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty Edit withTianlinPapers Home Kyoung's pictureWindManitoba,Wisconsin River Power Company

  1. EIS-0147: Continued Operation of the K-,L-, and P- Reactors, Savannah River Site, Aiken, South Carolina

    Broader source: Energy.gov [DOE]

    This environmental impact statement (EIS) analyzes the environmental impacts of the proposed action, which is to continue operation of K-, L-, and P-Reactors at the Savannah River Site (SRS) to ensure the capability to produce nuclear materials, and to produce nuclear materials as necessary for United States defense and nondefense programs.

  2. Characterization and reclamation assessment for the Central Shops Diesel Storage Facility, Savannah River Site, Aiken, South Carolina

    SciTech Connect (OSTI)

    Fliermans, C.B.; Hazen, T.C.; Bledsoe, H.

    1993-10-01T23:59:59.000Z

    The contamination of subsurface terrestrial environments by organic contaminants is a global phenomenon. The remediation of such environments requires innovative assessment techniques and strategies for successful clean-ups. Central Shops Diesel Storage Facility at Savannah River Site was characterized to determine the extent of subsurface diesel fuel contamination using innovative approaches and effective bioremediation techniques for clean-up of the contaminant plume have been established.

  3. Lance water injection tests adjacent to the 281-3H retention basin at the Savannah River Site, Aiken, South Carolina

    SciTech Connect (OSTI)

    Freifeld, B.; Myer, L.; Moridis, G.; Cook, P.; James, A.; Pellerin, L.; Pruess, K.

    1996-09-01T23:59:59.000Z

    A pilot-scale field demonstration of waste isolation using viscous- liquid containment barriers has been planned for the 281-3H retention basin at the Savannah River Site, Aiken, SC. The 281-3H basin is a shallow retention/seepage basin contaminated mainly by radionuclides. The viscous-liquid containment barrier utilizes the permeation of liquid grout to either entomb the contaminants within a monolithic grout structure or to isolate the waste by drastically reducing the permeability, of the soils around the plume. A clear understanding of the hydrogeologic setting of the retention basin is necessary for proper design of the viscous liquid barrier. To aid in the understanding of the hydrogeology of the 281-3H retention basin, and to obtain critical parameters necessary for grout injection design, a series of tests were undertaken in a region immediately adjacent to the basin. The objectives of the LWIT were: 1. To evaluate the general performance of the Lance Injection Technique for grout emplacement at the site, including the range and upper limits of injection pressures, the flow rates applicable for site conditions, as well as the mechanical forces needed for lance penetration. 2. To obtain detailed information on the injectability of the soils immediately adjacent to the H-area retention basin. 3. To identify any high permeability zones suitable for injection and evaluate their spatial distribution. 4. To perform ground penetrating radar (GPR) to gain information on the structure of the soil column and to compare the results with LWIT data. This report will focus on results pertinent to these objectives.

  4. Interim activities report. [Westinghouse Savannah River Company

    SciTech Connect (OSTI)

    Majzlik, E.H. Jr.

    1992-01-01T23:59:59.000Z

    Several developments have occurred since the 32nd WANTO Meeting that effect the status of the Savannah River Site. A request to restart K-Reactor was issued after nearly three years of intensive engineering analysis, procedure revisions and enhanced operator training to upgrade all aspects of reactor operation. In early December 1991, the Westinghouse Savannah River Company requested permission from DOE to start the K-Reactor. In mid-December the DOE and the Defense Nuclear Facility Safety Board concurred with readiness to operate and a Federal Circuit Court of Appeals ruled against a lawsuit to delay restart until a cooling tower is completed. The K-Reactor was restarted and has been in an evaluation and testing mode. Full power operation at thirty percent of maximum capacity is projected for March 1992 after which actual tritium generation will begin. Operation will continue until October when the cooling tower will be tied into the reactor cooling system. In conjunction with the restart of K-Reactor, the P-Reactor has been placed in permanent shutdown status and the L-Reactor has been placed in warm stand-by. In another reactor related situation, the DOE will delay the decision on construction of the New Production Reactor (NPR) until 1993. The choice of reactor type and location of the NPR will be integrated into the overall programmatic decision on Reconfiguration of the Weapons Complex. Finally, construction of the Replacement Tritium Facility (RTF) was resumed in December 1991 after several months stoppage for evaluation and revision of project funding procedures.

  5. Superfund record of decision (EPA Region 4): Savannah River Site (USDOE), Motor Shops Seepage Basin (716-A), Aiken, SC, June 26, 1998

    SciTech Connect (OSTI)

    NONE

    1998-10-01T23:59:59.000Z

    The Motor Shops Seepage Basin (716-A) (MSSB) is listed as a Resource Conservation and Recovery Act (RCRA) 3004(u) solid waste management unit/Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) unit in Appendix C of the Federal Facility Agreement (FFA) (FFA 1993) for the Savannah River Site (SRS), in Aiken, South Carolina. The selected alternative was developed in accordance with CERCLA, as amended, and to the extent practicable, the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The selected remedy for MSSB is No Action. Investigation of this operable unit was performed to determine if hazardous substances had been released to the environment. The Baseline Risk Assessment indicated that there were no significant releases to the environment. Therefore, it appears that either there were no significant discharges of hazardous materials to the seepage basin or natural remediation processes (i.e., bioremediation) have reduced the levels of hazardous materials to the extent that they no longer pose risk to human health or the environment. The Baseline Risk Assessment considered both the future residential and future industrial land use scenarios. Benzo(a)pyrene was the only preliminary constituent of concern (human health) detected in the soil at MSSB. Benzo(a)pyrene was detected only in the top foot of soil at levels which give risk values greater than 1 {times} 16{sup {minus}6} (but less than 1 {times} 10{sup {minus}4}) for the future adult/child resident. Further uncertainty analysis indicated that benzo(a)pyrene should not be considered a constituent of concern for the MSSB due to: (1) low frequency of detection; (2) unit history that strongly suggests it came from an adjacent source; and (3) conservative methodology was utilized in the risk assessment. No ecological or contaminant migration constituents of concern were identified at this unit. Therefore, No Action is the appropriate remedy and a five year ROD review will not be required. The South Carolina Department of Health and Environmental Control has modified the SRS RCRA permit to incorporate the No Action remedy.

  6. VBR-0002- In the Matter of Westinghouse Savannah River Company

    Broader source: Energy.gov [DOE]

    This supplemental order concerns a Motion for Reconsideration (Case No. VBR-0002) filed by Westinghouse Savannah River Company (WSRC) on November 12, 1999. The reconsideration motion relates to an...

  7. AIKEN TECHNICAL COLLEGE CAMPUS

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOnItemResearch >InternshipDepartmentNeutrino-Induced1 TEMPERATUREiiO E / E I A -AIKEN

  8. Biological monitoring of Upper Three Runs Creek, Savannah River Plant, Aiken County, South Carolina. Final report on macroinvertebrate stream assessments for F/H area ETF effluent discharge, July 1987--February 1990

    SciTech Connect (OSTI)

    Specht, W.L.

    1991-10-01T23:59:59.000Z

    In anticipation of the fall 1988 start up of effluent discharges into Upper Three Creek by the F/H Area Effluent Treatment Facility of the Savannah River Site, Aiken, SC, a two and one half year biological study was initiated in June 1987. Upper Three Runs Creek is an intensively studied fourth order stream known for its high species richness. Designed to assess the potential impact of F?H area effluent on the creek, the study includes qualitative and quantitative macroinvertebrate stream surveys at five sites, chronic toxicity testing of the effluent, water chemistry and bioaccumulation analysis. This final report presents the results of both pre-operational and post-operational qualitative and quantitative (artificial substrate) macroinvertebrate studies. Six quantitative and three qualitative studies were conducted prior to the initial release of the F/H ETF effluent and five quantitative and two qualitative studies were conducted post-operationally.

  9. Farmington River Power Company | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual SiteofEvaluating A PotentialJumpGerman AerospaceEfficiency IncentivesCoop, IncFarmington River

  10. Ichthyoplankton entrainment study at the SRS Savannah River water intakes for Westinghouse Savannah River Company

    SciTech Connect (OSTI)

    Paller, M. (Westinghouse Savannah River Co., Aiken, SC (United States))

    1992-03-26T23:59:59.000Z

    Cooling water for L and K Reactors and makeup water for Par Pond is pumped from the Savannah River at the 1G, 3G, and 5G pump houses. Ichthyoplankton (drifting fish larvae and eggs) from the river are entrained into the reactor cooling systems with the river water and passed through the reactor's heat exchangers where temperatures may reach 70[degrees]C during full power operation. Ichthyoplankton mortality under such conditions is assumed to be 100 percent. The number of ichthyoplankton entrained into the cooling system depends on a variety of variables, including time of year, density and distribution of ichthyoplankton in the river, discharge levels in the river, and the volume of water withdrawn by the pumps. Entrainment at the 1 G pump house, which is immediately downstream from the confluence of Upper Three Runs Creek and the Savannah River, is also influenced by discharge rates and ichthyoplankton densities in Upper Three Runs Creek. Because of the anticipated restart of several SRS reactors and the growing concern surrounding striped bass and American shad stocks in the Savannah River, the Department of Energy requested that the Environmental Sciences Section (ESS) of the Savannah River Laboratory sample ichthyoplankton at the SRS Savannah River intakes. Dams Moore, Inc., under a contract with Westinghouse Savannah River Company performed the sampling and data analysis for the ESS.

  11. Savannah River Site Saves $10 Million with Innovative Commercial Procurement Practices

    Broader source: Energy.gov [DOE]

    AIKEN, S.C. – The management and operations contractor for the EM program at the Savannah River Site (SRS) created more than $10 million in cost savings in fiscal year 2013 by adopting successful purchasing practices used by America’s top companies.

  12. Baseline mapping study of the Steed Pond aquifer and vadose zone beneath A/M Area, Savannah River Site, Aiken, South Carolina

    SciTech Connect (OSTI)

    Jackson, D.G. Jr.

    2000-01-27T23:59:59.000Z

    This report presents the second phase of a baseline mapping project conducted for the Environmental Restoration Department (ERD) at Savannah River Site. The purpose of this second phase is to map the structure and distribution of mud (clay and silt-sized sediment) within the vadose zone beneath A/M Area. The results presented in this report will assist future characterization and remediation activities in the vadose zone and upper aquifer zones in A/M Area.

  13. Numerical simulation of groundwater flow and contaminant transport at the K, L, and P areas of the Savannah River Site, Aiken, South Carolina

    SciTech Connect (OSTI)

    Not Available

    1989-11-01T23:59:59.000Z

    The Department of Energy (DOE) is preparing an Environmental Impact Statement (EIS) as part of the process for continuing operation of three reactors at the Savannah River Site (SRS). As required by the National Environmental Policy Act (NEPA), the EIS must address the potential environmental consequences to human health and the environment of this major federal action.'' Some of the possible consequences are related to subsurface transport of radionuclides released to seepage basins during normal reactor operation. To assist in the evaluation of the potential subsurface environmental impacts of these releases, Camp Dresser McKee Inc. (CDM) was contracted in June of 1989 to develop a three-dimensional groundwater flow and contaminant transport model which will simulate the movement of radionuclides at each of the reactor areas after they enter the groundwater system through the seepage basins. This report describes the development, calibration, and simulation results of the groundwater flow and contaminant transport model developed for this task. 10 refs., 63 figs., 11 tabs.

  14. SAVANNAH RIVER OPERATIONS OFFICE AIKEN, SC 29802

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Scienceand Requirements RecentlyElectronicResourcesjobs Running jobsS2. Receipts and QualityH

  15. Ichthyoplankton entrainment study at the SRS Savannah River water intakes for Westinghouse Savannah River Company. Final report

    SciTech Connect (OSTI)

    Paller, M. [Westinghouse Savannah River Co., Aiken, SC (United States)

    1992-03-26T23:59:59.000Z

    Cooling water for L and K Reactors and makeup water for Par Pond is pumped from the Savannah River at the 1G, 3G, and 5G pump houses. Ichthyoplankton (drifting fish larvae and eggs) from the river are entrained into the reactor cooling systems with the river water and passed through the reactor`s heat exchangers where temperatures may reach 70{degrees}C during full power operation. Ichthyoplankton mortality under such conditions is assumed to be 100 percent. The number of ichthyoplankton entrained into the cooling system depends on a variety of variables, including time of year, density and distribution of ichthyoplankton in the river, discharge levels in the river, and the volume of water withdrawn by the pumps. Entrainment at the 1 G pump house, which is immediately downstream from the confluence of Upper Three Runs Creek and the Savannah River, is also influenced by discharge rates and ichthyoplankton densities in Upper Three Runs Creek. Because of the anticipated restart of several SRS reactors and the growing concern surrounding striped bass and American shad stocks in the Savannah River, the Department of Energy requested that the Environmental Sciences Section (ESS) of the Savannah River Laboratory sample ichthyoplankton at the SRS Savannah River intakes. Dams & Moore, Inc., under a contract with Westinghouse Savannah River Company performed the sampling and data analysis for the ESS.

  16. Aiken Electric Coop Inc | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty Edit withTianlinPapersWindeySanta2004) |Agawam,Ahmeek, Michigan:County, SouthAiken

  17. Aiken Standard: Japanese company learns management techniques from SRNL |

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed off Energy.gov. Are you0 ARRA Newsletters 20103-03Energy AdvancedJudge | Department ofDepartment

  18. Savannah River Ecology Laboratory FY2006 Annual Technical Progress Report

    SciTech Connect (OSTI)

    Paul M. Bertsch

    2006-10-23T23:59:59.000Z

    FY2006 annual report of research conducted by the Savannah River Ecology Laboratory, a research unit of the University of Georgia operating on the Savannah River Site in Aiken, County, SC.

  19. Savannah River Ecology Laboratory 2004 Annual Technical Progress Report

    SciTech Connect (OSTI)

    Paul M. Bertsch

    2004-07-29T23:59:59.000Z

    2004 annual report of research conducted by the Savannah River Ecology Laboratory, a research unit of The University of Georgia operating on the Savannah River Site in Aiken, South Carolina

  20. Savannah River Ecology Laboratory 2005 Annual Technical Progress Report

    SciTech Connect (OSTI)

    Paul M. Bertsch

    2005-07-19T23:59:59.000Z

    2005 annual report of research conducted by the Savannah River Ecology Laboratory, a research unit of The University of Georgia operating on the Savannah River Site, Aiken, South Carolina

  1. Kern River Cogeneration Company Box 80478, Bakers'field, CA 93380 (661) 615-4630 Neil E. Burgess, Executive Director

    E-Print Network [OSTI]

    with enhanced Dry Low NOx (DLNI +) combustors, four (4) unfired heat recovery steam generators (HRSGs), each the operation of the combustion gas turbine units at Kern River Cogeneration Company in an extended startup mode as the normal two hour startup period. The 12 hour startup period is used to tune the units, typically following

  2. Nonlinear Complex-Resistivity Survey for DNAPL at the Savannah River Site A-014 Outfall Robert E. Grimm1,4

    E-Print Network [OSTI]

    Grimm, Robert E.

    , 1500 Illinois St., Golden, Colo. 80401 6 Savannah River National Laboratory, Building 773-42a, Aiken, SNonlinear Complex-Resistivity Survey for DNAPL at the Savannah River Site A-014 Outfall Robert E at the A-014 Outfall at the Savannah River Site, Aiken, SC. The purpose of this experiment was to field

  3. SRO -NERP-1 THE SAVANNAH RIVER PLANT

    E-Print Network [OSTI]

    Georgia, University of

    AND TREATMENT by Whit Gibbons Savannah River Ecology Laboratory Aiken , South Carolina A PUBLICATION OF EROA 'S SAVANNAH RIVER NATIONAL ENVIRONMENTAL RESEARCH PARK -SEPTEMBER 1977 COPIES MAY BE OBTAINEO FROM SAVANNAHSRO -NERP-1 SNAKES OF THE SAVANNAH RIVER PLANT WITH INFORMATION ABOUT SNAKEBITE PREVENTION

  4. Faces of the Recovery Act: Jobs at Savannah River Site

    Broader source: Energy.gov [DOE]

    The Savannah River Site in Aiken, SC has been able to create/save thousands of jobs through the Recovery Act. These are the stories of just a few of the new hires.

  5. Faces of the Recovery Act: Jobs at Savannah River Site

    ScienceCinema (OSTI)

    Skila Harris

    2010-09-01T23:59:59.000Z

    The Savannah River Site in Aiken, SC has been able to create/save thousands of jobs through the Recovery Act. These are the stories of just a few of the new hires.

  6. Faces of the Recovery Act: Jobs at Savannah River Site

    ScienceCinema (OSTI)

    Clark, Doug; Picciano, Bill; Culpepper, Kelli; Cole, Nancy; Oliver, Rahmel;

    2013-05-29T23:59:59.000Z

    The Savannah River Site in Aiken, SC has been able to create/save thousands of jobs through the Recovery Act. These are the stories of just a few of the new hires.

  7. U.S. Department of Energy Office of Inspector General report on inspection of Westinghouse Savannah River Company fees for managing and operating the Savannah River Site

    SciTech Connect (OSTI)

    NONE

    1995-08-03T23:59:59.000Z

    During the first five years of its contract with the Department of Energy, Westinghouse Savannah River Company was paid over $130 million in fees to manage and operate the Savannah River Site. Fees paid to Westinghouse steadily increased over the five year period. For example, fees paid for the last six months of this five year period were over three times as large as fees paid for the first six months. The purpose of this inspection was to review the Department`s annual negotiation of total available fees with Westinghouse, and to examine the reasons for the growth in fees over this five year period. The review disclosed that, after Fiscal Year 1989, the Department used an increasing number of fee bases in calculating Westinghouse Savannah River Company`s fixed-fee-equivalents from the maximum fee schedules within the Department of Energy Acquisition Regulation. The authors found that the Department had significantly increased the percentage of the dollar value of subcontracts being placed in Westinghouse`s fee bases for fee calculation purposes. They found that the Department had effectively increased Westinghouse`s fixed-fee-equivalents by approximately $3 million in both Fiscal Year 1993 and 1994 to, in large part, fund an unallowable employee incentive compensation program. They found that Westinghouse`s total paid fees for the five year period increased significantly over what they would have been had the terms resulting from the original competitive negotiations been maintained. The authors recommended that the Deputy Assist Secretary for Procurement and Assistance Management require that changes in either the number or composition of fee bases used in calculating fees from the maximum fee schedules be submitted to the Department`s Procurement Executive for approval.

  8. Conrad Aiken's manipulation of point of view in selected short stories

    E-Print Network [OSTI]

    Abbe, Margaret Ann

    1975-01-01T23:59:59.000Z

    thank Dr. Harry Kroitor for his encouragement in the preparation of this thesis and his guidance in the understanding of point of view. Finally, I went to thank my husband and my parents for their encouragement, support, and patience. viii TABIZ... of tone. Most criticisms briefly explicate Aiken'8 short stories or deal with symbolic meanings within them. Frederick Hoffman, for example, explicates several of Aiken's stories in his book Conrad Aiken and 10 also deals briefly with symbolic meaning...

  9. Federal Facilities Liaison Weighs in on EM Achievements, Challenges at Savannah River Site

    Broader source: Energy.gov [DOE]

    AIKEN, S.C. – For more than two decades, Shelly Wilson has been working with the Savannah River Site (SRS) as an employee of South Carolina Department of Health and Environmental Control (SCDHEC)....

  10. Community-Minded Interns at Savannah River Site Help Area Residents in Need with Home Repairs

    Broader source: Energy.gov [DOE]

    AIKEN, S.C. – More than two dozen college interns who worked at the Savannah River Site (SRS) this summer joined other volunteers and headed into area neighborhoods to help people in need with home repairs.

  11. A PUBLICATION OF DOE'S SAVANNAH RIVER SITE NATIONAL ENVIRONMENTAL RESEARCH PARK

    E-Print Network [OSTI]

    Georgia, University of

    #12;A PUBLICATION OF DOE'S SAVANNAH RIVER SITE NATIONAL ENVIRONMENTAL RESEARCH PARK April 1990 River Ecology Laboratory Drawer E Aiken, SC 29802 USA #12;VEGETATION OF THE SAVANNAH RIVER SITE: MAJOR COMMUNITY TYPES Sarah W. Workman Kenneth W. McLeod Savannah River Ecology Laboratory A Publication

  12. eo SRQ-NERP-15 FLORA OF THE SAVANNAH RIVER PLANT

    E-Print Network [OSTI]

    Georgia, University of

    of the S.vann.h River PI.nt National Environm.nta. R····rch Park Program #12;FLORA OF TIlE SAVANNAH RIVER 29808 and J . nrOHAS JONES JEANNINE S. ANGERMAN Savannah River Ecology Laboratory Drawer E, Aiken, SC 29801 A Publication of the Savannah River Plant National Environmeneal Res.arch Park Program 1985

  13. A Publication of the Savannah River Ecology Laboratory National Environmental Research Park Program

    E-Print Network [OSTI]

    Georgia, University of

    A Publication of the Savannah River Ecology Laboratory National Environmental Research Park Program of the Savannah River Site National Environmental Research Park Program SRO-NERP-28 2005 Prepared under the auspices of The University of Georgia Savannah River Ecology Laboratory P.O. Drawer E Aiken, South Carolina

  14. EIS-0082-S2: Savannah River Site Salt Processing, Savannah River Site, Aiken, South Carolina

    Broader source: Energy.gov [DOE]

    This SEIS evaluates the potential environmental impacts of alternatives for separating the high-activity fraction from the low-activity fraction of the high-level radioactive waste salt solutions...

  15. Design and construction of the defense waste processing facility project at the Savannah River Plant

    SciTech Connect (OSTI)

    Baxter, R G

    1986-01-01T23:59:59.000Z

    The Du Pont Company is building for the Department of Energy a facility to vitrify high-level radioactive waste at the Savannah River Plant (SRP) near Aiken, South Carolina. The Defense Waste Processing Facility (DWPF) will solidify existing and future radioactive wastes by immobilizing the waste in Processing Facility (DWPF) will solidify existing and future radioactives wastes by immobilizing the waste in borosilicate glass contained in stainless steel canisters. The canisters will be sealed, decontaminated and stored, prior to emplacement in a federal repository. At the present time, engineering and design is 90% complete, construction is 25% complete, and radioactive processing in the $870 million facility is expected to begin by late 1989. This paper describes the SRP waste characteristics, the DWPF processing, building and equipment features, and construction progress of the facility.

  16. Savannah River Site’s H Canyon Begins 2012 with New and Continuing Missions- Transuranic waste remediation, new mission work are the focus of the nation’s only active nuclear chemical separations facility in 2012

    Broader source: Energy.gov [DOE]

    AIKEN, S.C. – The Savannah River Site (SRS) is breathing new life into the H Canyon, the only active nuclear chemical separations facility still operating in the U.S.

  17. Waste certification review program at the Savannah River Site

    SciTech Connect (OSTI)

    Faulk, G.W.; Kinney, J.C. [Westinghouse Savannah River Co., Aiken, SC (United States); Knapp, D.C. [Bechtel Savannah River Inc., Aiken, SC (United States); Burdette, T.E. [Science Applications International Corp., Oak Ridge, TN (United States)

    1996-02-01T23:59:59.000Z

    After approving the waste certification programs for 45 generators of low-level radioactive and mixed waste, Westinghouse Savannah River Company (WSRC) moved forward to implement a performance-based approach for assuring that approved waste generators maintain their waste certification programs. WSRC implemented the Waste Certification Review Program, which is comprised of two sitewide programs, waste generator self-assessments and Facility Evaluation Board reviews, integrated with the WSRC Solid Waste Management Department Waste Verification Program Evaluations. The waste generator self-assessments ensure compliance with waste certification requirements, and Facility Evaluation Board reviews provide independent oversight of generators` waste certification programs. Waste verification evaluations by the TSD facilities serve as the foundation of the program by confirming that waste contents and generator performance continue to meet waste acceptance criteria (WSRC 1994) prior to shipment to treatment, storage, and disposal facilities. Construction of the Savannah River Site (SRS) was started by the US Government in 1950. The site covers approximately 300 square miles located along the Savannah River near Aiken, South Carolina. It is operated by the US Department of Energy (DOE). Operations are conducted by managing and operating contractors, including the Westinghouse Savannah River Company (WSRC). Historically, the primary purpose of the SRS was to produce special nuclear materials, primarily plutonium and tritium. In general, low-level radioactive and mixed waste is generated through activities in operations. Presently, 47 SRS facilities generate low-level radioactive and mixed waste. The policies, guidelines, and requirements for managing these wastes are determined by DOE and are reflected in DOE Order 5820.2A (US DOE 1988).

  18. U.S. DEPARTMENT OF ENERGY * SAVANNAH RIVER SITE * AIKEN * SC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over OurThe Iron Spin Transition in2,EHSS A-Zandofpoint motional%^ U NCrudeD e pa r t

  19. U.S. DEPARTMENT OF ENERGY * SAVANNAH RIVER SITE * AIKEN * SC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over OurThe Iron Spin Transition in2,EHSS A-Zandofpoint motional%^ U NCrudeD e pa r

  20. U.S. DEPARTMENT OF ENERGY * SAVANNAH RIVER SITE * AIKEN * SC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over OurThe Iron Spin Transition in2,EHSS A-Zandofpoint motional%^ U NCrudeD e pa

  1. U.S. DEPARTMENT OF ENERGY * SAVANNAH RIVER SITE * AIKEN * SC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over OurThe Iron Spin Transition in2,EHSS A-Zandofpoint motional%^ U NCrudeD e paThe

  2. U.S. DEPARTMENT OF ENERGY * SAVANNAH RIVER SITE * AIKEN * SC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over OurThe Iron Spin Transition in2,EHSS A-Zandofpoint motional%^ U NCrudeD e

  3. U.S. DEPARTMENT OF ENERGY * SAVANNAH RIVER SITE * AIKEN * SC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over OurThe Iron Spin Transition in2,EHSS A-Zandofpoint motional%^ U NCrudeD e Scaled

  4. U.S. DEPARTMENT OF ENERGY * SAVANNAH RIVER SITE * AIKEN * SC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over OurThe Iron Spin Transition in2,EHSS A-Zandofpoint motional%^ U NCrudeD e

  5. U.S. DEPARTMENT OF ENERGY * SAVANNAH RIVER SITE * AIKEN * SC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over OurThe Iron Spin Transition in2,EHSS A-Zandofpoint motional%^ U NCrudeD eAn Overview

  6. U.S. DEPARTMENT OF ENERGY * SAVANNAH RIVER SITE * AIKEN * SC

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic2Uranium Transferon theTedRegion | DepartmentEnergy 31, 2007 -* SAVANNAH

  7. WSRC-MS-93-362 IN-SITU BIOREMEDIATION VIA HORIZONTAL WELLS (U)

    E-Print Network [OSTI]

    Hazen, Terry

    RiverCompany SavannahRiver Site Aiken,SouthCarolina29808 B. B. Looney M. Enzien M. M. Franck C. B, M. M. Franck, C. B. Fliermans, and C. A. Eddy Westinghouse Savannah River Technology Center, Aiken. The Savannah River Site Integrated Demonstration focuses on the clean-up of soils and groundwater contaminated

  8. Toy to the World: Savannah River Site Celebrates 21 Years of Bringing Joy to Kids

    Broader source: Energy.gov [DOE]

    AIKEN, S.C. – Santa Claus and his elves are getting a lot of help from DOE’s Savannah River Site (SRS) this year. Federal employees and contractors donated more than 14,200 toys to support the U.S. Marine Reserves Toys for Tots campaign.

  9. EM Completes Salt Waste Disposal Units $8 Million under Budget at Savannah River Site

    Broader source: Energy.gov [DOE]

    AIKEN, S.C. – The EM program at Savannah River Site (SRS) has built two more low-level salt waste disposal units ahead of schedule and under budget. This work is essential to the mission of cleaning and closing the site's underground waste tanks.

  10. 2nd Annual DOE-ERSP PI Meeting: Abstracts

    E-Print Network [OSTI]

    Hazen, Terry C.

    2007-01-01T23:59:59.000Z

    H. Nitsche 4 Savannah River National Laboratory, Aiken, SCColumbia, SC Savannah River National Laboratory, Aiken, SCE. Turick Savannah River National Laboratory, Aiken, SC

  11. Inovative Site Characteristics of Microbes T.C. Hazen*1

    E-Print Network [OSTI]

    Hazen, Terry

    J.M. Dougherty4 C.B. Fliermans1 John Wear5 C.A. Eddy-Dilek1 1. Westinghouse Savannah River Company, SRTC, Aiken, SC 29808 2. Bechtel Savannah River Inc., Savannah River Technology Center, Aiken, SC 29808 3. Argonne National Laboratory, 9700 S. Cass Ave., ES/362, Argon, IL 60439-4815 4. US Environmental

  12. Cutting-Edge Savannah River Site Project Avoids Millions in Costs, Removes Chemical Solvents from Underground: Project avoided costs totaling more than $15 million, removed tons of chemical solvents from beneath the Savannah River Site

    Broader source: Energy.gov [DOE]

    AIKEN, S.C. – Workers recently completed a multiyear project that removed more than 33,000 gallons of non-radioactive chemical solvents from beneath a portion of the Savannah River Site (SRS), preventing those pollutants from entering the local water table and helping the site avoid costs of more than $15 million.

  13. Sanitary landfill local-scale flow and transport modeling in support of alternative concentrations limit demonstrations, Savannah River Site

    SciTech Connect (OSTI)

    Kelly, V.A.; Beach, J.A.; Statham, W.H.; Pickens, J.F. [INTERA, Inc., Austin, TX (United States)

    1993-02-19T23:59:59.000Z

    The Savannah River Site (SRS) is a Department of Energy (DOE) facility located near Aiken, South Carolina which is currently operated and managed by Westinghouse Savannah River Company (WSRC). The Sanitary Landfill (Sanitary Landfill) at the SRS is located approximately 2,000 feet Northwest of Upper Three Runs Creek (UTRC) on an approximately 70 acre site located south of Road C between the SRS B-Area and UTRC. The Sanitary Landfill has been receiving wastes since 1974 and operates as an unlined trench and fill operation. The original landfill site was 32 acres. This area reached its capacity around 1987 and a Northern Expansion of 16 acres and a Southern Expansion of 22 acres were added in 1987. The Northern Expansion has not been used for waste disposal to date and the Southern Expansion is expected to reach capacity in 1992 or 1993. The waste received at the Sanitary Landfill is predominantly paper, plastics, rubber, wood, metal, cardboard, rags saturated with degreasing solvents, pesticide bags, empty cans, and asbestos in bags. The landfill is not supposed to receive any radioactive wastes. However, tritium has been detected in the groundwater at the site. Gross alpha and gross beta are also evaluated at the landfill. The objectives of this modeling study are twofold: (1) to create a local scale Sanitary Landfill flow model to study hydraulic effects resulting from capping the Sanitary Landfill; and (2) to create a Sanitary Landfill local scale transport model to support ACL Demonstrations for a RCRA Part B Permit Renewal.

  14. Savannah River Site Team Wins Carolina Challenge at 2012 DOE Security Protection Officer Competition

    Broader source: Energy.gov [DOE]

    Savannah River Site, Aiken, S.C. – Security Protection Officers from Savannah River Site’s (SRS) security contractor WSI-SRS, today won the Department of Energy (DOE) Secretary’s Trophy as the top DOE team in the 2012 Security Protection Officer Team Competition (SPOTC)- 2012 Carolina Challenge, held here, April 22-26. It was the 40th anniversary of the SPOTC competition.

  15. Savannah River Site environmental report for 1991

    SciTech Connect (OSTI)

    Arnett, M.W.; Karapatakis, L.K.; Mamatey, A.R.; Todd, J.L.

    1991-01-01T23:59:59.000Z

    This report describes environmental activities conducted on and in the vicinity of the Savannah River Site (SRS) in Aiken, S.C., from Jan. 1 to Dec. 31, 1991, with an update on compliance activities through April 1, 1992. The report is a single volume with a separate summary pamphlet highlighting the major findings for 1991. The report is divided into an executive summary and 14 chapters containing information on environmental compliance issues, environmental monitoring methods and programs, and environmental research activities for 1991, as well as historical data from previous years. Analytical results, figures, charts, and data tables relevant to the environmental monitoring program for 1991 at SRS are included.

  16. Identifying key controls on the behavior of an acidic-U(VI) plume in the Savannah River Site using reactive transport modeling

    E-Print Network [OSTI]

    Hubbard, Susan

    National Lab., 1 Cyclotron Road Mail Stop 90R1116, Berkeley, CA 94720-8126, United States b Savannah RiverIdentifying key controls on the behavior of an acidic-U(VI) plume in the Savannah River Site using National Lab., Bldg. 773-42A, Aiken, SC 29808, United States a r t i c l e i n f o a b s t r a c t Article

  17. Geochemical and physical properties of wetland soils at the Savannah River site

    SciTech Connect (OSTI)

    Dixon, K.L; Rogers, V.A.; Conner, S.P.; Cummings, C.L.; Gladden, J.B.; Weber, J.M.

    1996-05-01T23:59:59.000Z

    The Savannah River Site (SRS), located in Aiken, Allendale, and Barnwell Counties, South Carolina, is a nuclear production facility operated for the U.S. Department of Energy (DOE) by Westinghouse Savannah River Company (WSRC). To facilitate future human health and ecological risk assessments, treatability studies, remedial investigations, and feasibility studies for its wetland areas, SRS needs a database of background geochemical and physical properties of wetland soils. These data are needed for comparison to data collected from wetland soils that may have been affected by SRS operations. SRS contains 36,000 acres of wetlands and an additional 5,000 acres of bottom land soils subject to flooding. Recent studies of wetland soils near various waste units at SRS show that some wetlands have been impacted by releases of contaminants resulting from SRS operations (WSRC, 1992). Waste waters originating from the operations facilities typically have been discharged into seepage basins located in upland soils, direct discharge of waste water to wetland areas has been minimal. This suggests that impacted wetland areas have been affected indirectly as a result of transport mechanisms such as surface runoff, groundwater seeps, fluvial or sediment transport, and leaching. Looney et al. (1990) conducted a study to characterize the geochemical and physical properties of upland soils and shallow sediments on the SRS. A primary objective of the upland study was to collect the data needed to assess the qualitative and quantitative impacts of SRS operations on the environment. By comparing the upland soils data to data collected from waste units located in similar soils, SRS impacts could be assessed. The data were also intended to aid in selection of remediation alternatives. Because waste units at SRS have historically been located in upland areas, wetland soils were not sampled. (Abstract Truncated)

  18. Preliminary Notice of Violation, Westinghouse Savannah River...

    Broader source: Energy.gov (indexed) [DOE]

    March 19, 2002 Issued to Westinghouse Savannah River Company related to Safety Basis and Radiation Protection Violations at the Savannah River Site, On March 19, 2002, the U.S....

  19. Preliminary Notice of Violation, Westinghouse Savannah River...

    Broader source: Energy.gov (indexed) [DOE]

    December 5, 1997 Issued to Westinghouse Savannah River Company, related to an Unplanned Radioactive Material Intake at the Savannah River Site, (EA-97-12) On December 5, 1997, the...

  20. EIS-0220: Interim Management of Nuclear Materials at the Savannah River Site

    Broader source: Energy.gov [DOE]

    This environmental impact statement assesses the potential environmental impacts of actions necessary to manage nuclear materials at the Savannah River Site (SRS) in Aiken, South Carolina, until decisions on their ultimate disposition are made and implemented. The Department of Energy has decided to initiate actions which will stabilize certain of the SRS materials that represent environment, safety and health vulnerabilities in their current storage condition or which may represent a vulnerability within the next 10 years.

  1. Preliminary Notice of Violation, Westinghouse Savannah River...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice of Violation, Westinghouse Savannah River Company - EA-2000-08 Type B Accident Investigation Board Report on the September 1, 1999, Plutonium Intakes at the...

  2. Preliminary Notice of Violation, Westinghouse Savannah River...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Westinghouse Savannah River Company - EA-2000-08 More Documents & Publications Type B Accident Investigation Board Report on the September 1, 1999, Plutonium Intakes at the...

  3. EIS-0062: Double-Shell Tanks for Defense High Level Waste Storage, Savannah River Site, Aiken, SC

    Broader source: Energy.gov [DOE]

    This EIS analyzes the impacts of the various design alternatives for the construction of fourteen 1.3 million gallon high-activity radioactive waste tanks. The EIS further evaluates the effects of these alternative designs on tank durability, on the ease of waste retrieval from such tanks, and the choice of technology and timing for long-term storage or disposal of the wastes.

  4. Regional groundwater flow model for C, K. L. and P reactor areas, Savannah River Site, Aiken, SC

    SciTech Connect (OSTI)

    Flach, G.P.

    2000-02-11T23:59:59.000Z

    A regional groundwater flow model encompassing approximately 100 mi2 surrounding the C, K, L, and P reactor areas has been developed. The reactor flow model is designed to meet the planning objectives outlined in the General Groundwater Strategy for Reactor Area Projects by providing a common framework for analyzing groundwater flow, contaminant migration and remedial alternatives within the Reactor Projects team of the Environmental Restoration Department. The model provides a quantitative understanding of groundwater flow on a regional scale within the near surface aquifers and deeper semi-confined to confined aquifers. The model incorporates historical and current field characterization data up through Spring 1999. Model preprocessing is automated so that future updates and modifications can be performed quickly and efficiently. The CKLP regional reactor model can be used to guide characterization, perform scoping analyses of contaminant transport, and serve as a common base for subsequent finer-scale transport and remedial/feasibility models for each reactor area.

  5. Soil cleaning at Czechowice Refinery A. Worsztynowicz1

    E-Print Network [OSTI]

    Hazen, Terry

    . Kossutha 6, Poland 2. Westinghouse Savannah River Company, Aiken, South Carolina, 29808 USA 3. Lawrence Berkeley National Laboratory, Berkeley, California, 94720 USA Abstract. As a part of the US DOE - IETU

  6. Hazen, T. C., A. J. Tien, A. Worsztynowicz, D. J. Altman, K. Ulfig, and T. Manko. 2003. Biopiles for Remediation of Petroleum-Contaminated Soils: A Polish Case Study. NATO Advanced Research

    E-Print Network [OSTI]

    Hazen, Terry

    . ALTMAN2 , K. ULFIG3 , AND T. MANKO3 1 Lawrence Berkeley National Laboratory, MS 70A-3317, One Cyclotron Rd., Berkeley, CA 94720 USA, 2 Westinghouse Savannah River Company, Bldg 704-8T, Aiken, SC 29808 USA

  7. Savannah River Site environmental report for 1991. [Contains Glossary

    SciTech Connect (OSTI)

    Arnett, M.W.; Karapatakis, L.K.; Mamatey, A.R.; Todd, J.L.

    1991-01-01T23:59:59.000Z

    This report describes environmental activities conducted on and in the vicinity of the Savannah River Site (SRS) in Aiken, S.C., from Jan. 1 to Dec. 31, 1991, with an update on compliance activities through April 1, 1992. The report is a single volume with a separate summary pamphlet highlighting the major findings for 1991. The report is divided into an executive summary and 14 chapters containing information on environmental compliance issues, environmental monitoring methods and programs, and environmental research activities for 1991, as well as historical data from previous years. Analytical results, figures, charts, and data tables relevant to the environmental monitoring program for 1991 at SRS are included.

  8. Management approaches for environmental restoration at the U.S. Department of Energy Weapons Complex, Savannah River Site: A case study

    SciTech Connect (OSTI)

    Johnson, S.V. [USDOE Savannah River Operations Office, Aiken, SC (United States); Mayberry, J.J. [Ebasco Environmental Div., Augusta, GA (United States)

    1993-12-31T23:59:59.000Z

    This paper introduces the management approaches for environmental restoration at the US Department of Energy Weapons Complex. A brief chronology of environmental restoration complex-wide is presented. This chronology, which focuses on the changing climate at DOE facilities, is then keyed to activities at the Savannah River Site (SRS) in Aiken, South Carolina, USA. Past, present, and future environmental restoration activities at SRS are discussed, reflecting the change in emphasis at the site.

  9. APPLIED AND ENVIRONMENTAL MICROBIOLOGY, June 1994, p. 2200-2204 Vol. 60, No. 6 0099-2240/94/$04.00+0

    E-Print Network [OSTI]

    Hazen, Terry

    . HAZEN,'* R. G. ARNOLD,2 AND CARL B. FLIERMANS1 Savannah River Technology Center, Westinghouse Savannah Demonstration at the Savannah River Site for the in situ * Corresponding author. Mailing address: Savannah River Technol- ogy Center, Westinghouse Savannah River Company, Bldg. 704-8T, Aiken, SC 29802. Phone: (803) 725

  10. Molecular Interactions of Plutonium(VI) with Synthetic Manganese-Substituted Goethite

    E-Print Network [OSTI]

    Hu, Yung-Jin

    2011-01-01T23:59:59.000Z

    WA 99352 Savannah River National Laboratory, Aiken, SCWork at the Savannah River National Laboratory (SRNL) was

  11. Investment companies

    E-Print Network [OSTI]

    Sauer, Edward F

    1961-01-01T23:59:59.000Z

    stockholder challenged the management fee paid to F. Eberstadt & Co. , Inc. , manager and distributor of Chemical Fund. The court dismissed the case on the grounds that excessive fees had not been proved. This case, however, could hardly be considered a... Tax-Exempt Bond Funds. . . . . . . . Daily Pricing of Mutual Investment Company Shares. 56 57 59 59 60 iv Management Fees. . . . . Tax-Free Exchange Funds . 61 62 V. CONCLUSIONS 63 BIBLIOGRAPHY GLOSSARY OF TERMS Balanced fund...

  12. Environmental audit of the Savannah River Ecology Laboratory (SREL)

    SciTech Connect (OSTI)

    Not Available

    1993-09-01T23:59:59.000Z

    This report documents the results of the environmental audit conducted at the Savannah River Ecology Laboratory (SREL) at the Savannah River Site (SRS), principally in Aiken and Barnwell Counties, South Carolina. The audit was conducted by the US Department of Energy`s (DOE`s), Office of Environmental Audit (EH-24), beginning September 13, 1993, and ending September 23, 1993. The scope of the audit at SREL was comprehensive, addressing environmental activities in the technical areas of air; surface water/drinking water; groundwater/soil, sediment, and biota; waste management; toxic and chemical materials; inactive Waste sites; radiation; quality assurance; and environmental management. Specifically assessed was the compliance of SREL operations and activities with Federal, state, and local regulations; DOE Orders; and best management practices.

  13. Bioremediation of a Process Waste Lagoon at a Southern Polish Oil Refinery -DoE's First Demonstration Project in Poland

    E-Print Network [OSTI]

    Hazen, Terry

    2 Westinghouse Savannah River Company, Aiken, South Carolina, 29808 USA 3 Institute for Ecology of Industrial Areas, Katowice, 40-833, Poland 4 Lawrence Berkeley National Laboratory, Berkeley, California Savannah River Company (WSRC) for the United States Department of Energy (DOE), the Institute for Ecology

  14. G. A. Antaki Westinghouse Savannah River Company Savannah River...

    Office of Scientific and Technical Information (OSTI)

    configurations. Recognizing the excessive costs and the limited value added of wholesale analysis, the nuclear industry, through EPRI, has developed rules for the seismic...

  15. G. A. Antaki Westinghouse Savannah River Company Savannah River Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField8,Dist.Newof EnergyFunding OpportunityF G F ! ( ! ( ! ( ! ( ! (W S R

  16. Savannah River Site Environmental Report for 1998

    SciTech Connect (OSTI)

    Arnett, M.

    1999-06-09T23:59:59.000Z

    The mission at the Savannah River Site (SRS) is focused primarily on support of the national defense, nonproliferation, and environmental cleanup. SRS-through its prime operating contractor, Westinghouse Savannah River Company-continues to maintain a comprehensive environmental monitoring program.

  17. Groundwater Surface Water Interactions in a Gold-mined Floodplain of the Merced River

    E-Print Network [OSTI]

    Sullivan, Lynn Sager

    2013-01-01T23:59:59.000Z

    river flows and initial dredging efforts at the northeastare abandoned channels from the dredging era. The hydraulichit, the Snelling Gold Dredging Company and others acquired

  18. Environmental Assessment and Finding of No Significant Impact: Implementation of the Wetland Mitigation Bank Program at the Savannah River Site

    SciTech Connect (OSTI)

    N /A

    1999-04-28T23:59:59.000Z

    The Department of Energy (DOE) has prepared an environmental assessment (EA) (DOE/EA-1205) for the proposed implementation of a wetland mitigation bank program at the Savannah River Site (SRS), located near Aiken, South Carolina. Based on the analyses in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA). Therefore, the preparation of an environmental impact statement (EIS) is not required, and DOE is issuing this Finding of No Significant Impact (FONSI) and Floodplain Statement of Findings.

  19. Environmental Assessment and Finding of No Significant Impact: Pond B Dam Repair Project at the Savannah River Site

    SciTech Connect (OSTI)

    N /A

    1999-09-27T23:59:59.000Z

    The Department of Energy (DOE) has prepared an environmental assessment (EA) (DOE/EA-1285) for the proposed repair of the Pond B dam at the Savannah River Site (SRS), located near Aiken, South Carolina. Based on the analyses in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA). Therefore, the preparation of an environmental impact statement (EIS) is not required, and DOE is issuing this Finding of No Significant Impact (FONSI) and Floodplain Statement of Findings.

  20. Competitor Analysis Company Description

    E-Print Network [OSTI]

    Dahl, David B.

    chemical company providing the household and industrial detergent, personal care, lubricant, oilfield

  1. October 1, 1989 tornado at the Savannah River Site

    SciTech Connect (OSTI)

    Parker, M.J.; Kurzeja, R.J.

    1990-01-01T23:59:59.000Z

    A tornado with wind speeds in the 113 to 157 mph range struck the southern portion of the Savannah River Site near Aiken, SC at around 7:30 pm on October 1, 1989. The tornado was spawned from a severe thunderstorm with a height of 57,000 ft in a warm and humid air mass. Two million dollars in timber damage occurred over 2,500 acres along a ten-mile swath, but no onsite structural damage or personal injury occurred. Tree-fall patterns indicated that some of this damage was the result of thunderstorm downbursts which accompanied the tornado. Ground-based and aerial photography showed both snapped and mowed over trees which indicate that the tornado was elevated at times. 4 refs., 25 figs., 2 tabs.

  2. Implementation of ISO140001 at the Savannah River Site

    SciTech Connect (OSTI)

    Marra, S.L. [Westinghouse Savannah River Company, AIKEN, SC (United States); Reeves, R.D.

    1998-04-20T23:59:59.000Z

    The Department of Energy`s Savannah River Site (SRS) in Aiken, SC recently received ISO14001 certification. ISO14001 is an internationally recognized standard that delineates the elements of an effective environmental management system (EMS) and enhances environmental stewardship. SRS preparations for ISO14001 certification involved a comparison of existing programs to the requirements of the standard. Gaps in the program were identified and work initiated to fill those gaps. Primarily, these deficiencies were related to documentation of the SRS EMS and employee training. Certification was granted after an extensive review by a team of independent auditors. The review included personnel interviews, documentation reviews, and work practice observations. An overview of the preparation process as well as the independent review will be presented.

  3. Consumer Products Companies Company Website Headquarters

    E-Print Network [OSTI]

    McGaughey, Alan

    . www.coach.com New York, NY Coca-Cola Company www.thecoca-colacompany.com Atlanta, GA Cole & Ashcroft L

  4. Superfund record of decision (EPA Region 4): Savannah River (USDOE) M-area, west unit (631-21g), Aiken, SC, September 11, 1995

    SciTech Connect (OSTI)

    NONE

    1996-03-01T23:59:59.000Z

    The results of the Resource, Conservation and Recovery Act Facility Investigation/Comprehensive Environmental Response Compensation and Liability Act Remedial Investigation, indicate that the M-Area West unit poses no human health or the environment. Therefore, no action is needed at the M-Area West unit. Since M-Area West poses no threat to human health or the environment, and no action is needed, the CERCLA Section 121 requirements are not applicable. No five-year remedy review is needed or will be performed.

  5. EIS-0023: Long-Term Management of Defense High-Level Radioactive Wastes (Research and Development Program for Immobilization) Savannah River Plant, Aiken, South Carolina

    Broader source: Energy.gov [DOE]

    This EIS analyzes the potential environmental implications of the proposed continuation of a large Federal research and development (R&D) program directed toward the immobilization of the high...

  6. Gas Companies Program (Tennessee)

    Broader source: Energy.gov [DOE]

    The Gas Companies program is a set of rules that encourage the development of the natural gas industry in Tennessee. They empower gas companies to lay piped and extend conductors through the...

  7. Market Research Company Description

    E-Print Network [OSTI]

    Dahl, David B.

    development - Market research for enterprise and education adoption - Plan and execute a company-wide pingMarket Research Company Description: A company focused on developing web-based graphical and future products and then develop the necessary strategies and collateral to stay on the bleeding edge

  8. EIS-0217: Record of Decision

    Broader source: Energy.gov [DOE]

    Savannah River Site Waste Management, Savannah Rive Operations Office, Aiken, South Carolina (October 1995)

  9. Quantifying Individual Potential Contributions of the Hybrid Sulfur Electrolyzer

    E-Print Network [OSTI]

    Weidner, John W.

    Computational Sciences Directorate, Savannah River National Laboratory, Aiken, South Carolina 29808, USA

  10. Humans produce large amounts of waste that must be processed or stored so that it does not contaminate the

    E-Print Network [OSTI]

    Hodgson, Michael E.

    on the Savannah River National Laboratory near Aiken, South Carolina. Introduction Hazardous waste site management

  11. Environmental assessment operation of the HB-Line facility and frame waste recovery process for production of Pu-238 oxide at the Savannah River Site

    SciTech Connect (OSTI)

    NONE

    1995-04-01T23:59:59.000Z

    The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0948, addressing future operations of the HB-Line facility and the Frame Waste Recovery process at the Savannah River Site (SRS), near Aiken, South Carolina. Based on the analyses in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, DOE has concluded that, the preparation of an environmental impact statement is not required, and is issuing this Finding of No Significant Impact.

  12. U.S. Department of Energy Categorical Exclusion ...

    Broader source: Energy.gov (indexed) [DOE]

    Solids Savannah River Site AikenAikenSouth Carolina Flowsheet development for K-Area Materials Storage and the Nuclear Material Disposition Project may include the...

  13. U.S. Department of Energy Categorical Exclusion ...

    Broader source: Energy.gov (indexed) [DOE]

    Plasma Pen Decontamination Research Savannah River Site AikenAikenSouth Carolina The Plasma Pen is being researched as an alternative method of tritium surface decontamination....

  14. U.S. Department of Energy Categorical Exclusion ...

    Broader source: Energy.gov (indexed) [DOE]

    Operation and Maintenance of Inductively Coupled Plasma Mass Spectrometry Method in 773, B142 Savannah River Site AikenAikenSouth Carolina The Analytical Development Section will...

  15. U.S. Department of Energy Categorical Exclusion ...

    Broader source: Energy.gov (indexed) [DOE]

    River Site AikenAikenSouth Carolina Soil bores will be advanced with a Rotosonic drilling rig to confirm the effectiveness of the Western Sector Dynamic Underground Stripping...

  16. U.S. Department of Energy Categorical Exclusion ...

    Broader source: Energy.gov (indexed) [DOE]

    Scaled Saltstone Facility Testing Savannah River Site AikenAikenSouth Carolina Tests will be conducted in the Engineering Development Laboratory (EDL, bldg. 786-A) to investigate...

  17. U.S. Department of Energy Categorical Exclusion ...

    Broader source: Energy.gov (indexed) [DOE]

    Caustic Side Solvent Extraction Unit (MCU) Life Extension Support Testing Savannah River Site AikenAikenSouth Carolina SRNL, and Engineering Developmental Laboratory (EDL) in...

  18. U.S. Department of Energy Categorical Exclusion ...

    Broader source: Energy.gov (indexed) [DOE]

    Scaled Saltstone Mixer Commissioning Savannah River Site AikenAikenSouth Carolina Tests will be conducted in the Engineering Development Laboratory (EDL, bldg. 786-A) to...

  19. U.S. Department of Energy Categorical Exclusion ...

    Broader source: Energy.gov (indexed) [DOE]

    Scaled Saltstone Mixer Wear Test Savannah River Site AikenAikenSouth Carolina Tests will be conducted in the Engineering Development Laboratory (EDL, bldg. 786-A) to investigate...

  20. U.S. Department of Energy Categorical Exclusion ...

    Broader source: Energy.gov (indexed) [DOE]

    Abandonment of the Western Sector Dynamic Underground Stripping (DUS) Project Steam Injection Wells Savannah River Site AikenAikenSouth Carolina The steam injection phase at the...

  1. U.S. Department of Energy Categorical Exclusion ...

    Broader source: Energy.gov (indexed) [DOE]

    Spectroscopy Savannah River Site AikenAikenSouth Carolina Raman and absorption spectroscopy instrumentation will be used in various labs at SRNL to determine the chemical and...

  2. U.S. Department of Energy Categorical Exclusion ...

    Broader source: Energy.gov (indexed) [DOE]

    Spectroscopy Savannah River Site AikenAikenSouth Carolina Raman and absorption spectroscopy instrumentation will be used in various labs at HTRL to determine the chemical and...

  3. U.S. Department of Energy Categorical Exclusion ...

    Broader source: Energy.gov (indexed) [DOE]

    Construction of a Connector Road Between the Construction Administration Complex (CAC) and the MOX Administration Complex (M Savannah River Site AikenAikenSouth Carolina MOX...

  4. QER- Comment of Southern Company

    Broader source: Energy.gov [DOE]

    Southern Company Services, Inc., as agent for Alabama Power Company, Georgia Power Company, Gulf Power Company, and Mississippi Power Company, (collectively, “Southern Companies”), are pleased to hereby provide their comments to the Department of Energy as it prepares the Quadrennial Energy Review. If there is anything else that we can do in this regard, please feel free to contact us.

  5. SAVANNAH RIVER NATIONAL LABORATORYREGENERATIVE FUEL CELL PROJECT

    SciTech Connect (OSTI)

    Motyka, T

    2008-11-11T23:59:59.000Z

    A team comprised of governmental, academic and industrial partners led by the Savannah River National Laboratory developed and demonstrated a regenerative fuel cell system for backup power applications. Recent market assessments have identified emergency response and telecommunication applications as promising near-term markets for fuel cell backup power systems. The Regenerative Fuel Cell System (RFC) consisted of a 2 kg-per-day electrolyzer, metal-hydride based hydrogen storage units and a 5 kW fuel cell. Coupling these components together created a system that can produce and store its own energy from the power grid much like a rechargeable battery. A series of test were conducted to evaluate the performance of the RFC system under both steady-state and transit conditions that might be encountered in typical backup power applications. In almost all cases the RFC functioned effectively. Test results from the demonstration project will be used to support recommendations for future fuel cell and hydrogen component and system designs and support potential commercialization activities. In addition to the work presented in this report, further testing of the RFC system at the Center for Hydrogen Research in Aiken County, SC is planned including evaluating the system as a renewable system coupled with a 20kW-peak solar photovoltaic array.

  6. Westinghouse Hanford Company Conduct of Operations Manual: GOCO Cross-Cultivation Committee, Operational Excellence Task Force

    SciTech Connect (OSTI)

    Schilperoort, D.

    1991-11-01T23:59:59.000Z

    This manual has been prepared to establish guidelines that are to be used at all Westinghouse Government Operations Business Unit (GOBU) sites and Westinghouse Savannah River Company (WSRC). The purpose of the manual is to establish standards that comply with the requirements of Department of Energy (DOE) Order 5480.19, ``Conduct of Operations Requirements for DOE Facilities`` and that will be used at all Westinghouse Government Operations Business Unit sites and Westinghouse Savannah River Company.

  7. Westinghouse Hanford Company Conduct of Operations Manual: GOCO Cross-Cultivation Committee, Operational Excellence Task Force

    SciTech Connect (OSTI)

    Schilperoort, D.

    1991-11-01T23:59:59.000Z

    This manual has been prepared to establish guidelines that are to be used at all Westinghouse Government Operations Business Unit (GOBU) sites and Westinghouse Savannah River Company (WSRC). The purpose of the manual is to establish standards that comply with the requirements of Department of Energy (DOE) Order 5480.19, Conduct of Operations Requirements for DOE Facilities'' and that will be used at all Westinghouse Government Operations Business Unit sites and Westinghouse Savannah River Company.

  8. Capital Reporting Company Quadrennial ...

    Office of Environmental Management (EM)

    3 05-27-2014 (866) 448 - DEPO www.CapitalReportingCompany.com 2014 1 QUADRENNIAL ENERGY REVIEW STAKEHOLDER MEETING 3 PETROLEUM TRANSMISSION, STORAGE AND DISTRIBUTION ISSUES...

  9. Capital Reporting Company Quadrennial ...

    Broader source: Energy.gov (indexed) [DOE]

    (866) 448 - DEPO www.CapitalReportingCompany.com 2014 1 UNITED STATES DEPARTMENT OF ENERGY OFFICE OF ENERGY POLICY AND SYSTEMS ANALYSIS QUADRENNIAL ENERGY REVIEW STAKEHOLDER...

  10. Capital Reporting Company Quadrennial ...

    Broader source: Energy.gov (indexed) [DOE]

    - DEPO www.CapitalReportingCompany.com 2014 1 UNITED STATE OF AMERICA DEPARTMENT OF ENERGY ---: : IN RE: : : QUADRENNIAL ENERGY REVIEW : : NEW...

  11. Energy Service Companies

    Broader source: Energy.gov [DOE]

    Energy service companies (ESCOs) develop, design, build, and fund projects that save energy, reduce energy costs, decrease operations and maintenance costs at their customers' facilities.

  12. Marketing Plan Company Description

    E-Print Network [OSTI]

    Dahl, David B.

    productivity without the jitters/crash of normal energy drinks and shots. Short Project Name: Internet groups would generate the most profit? How can we cross-market/up-sell to our email database and 20K the model) Company Description: We are a rapidly growing, subscription-based, finance and technology company

  13. Public Service Companies, General Provisions (Virginia)

    Broader source: Energy.gov [DOE]

    Public Service Companies includes gas, pipeline, electric light, heat, power and water supply companies, sewer companies, telephone companies, and all persons authorized to transport passengers or...

  14. Pennsylvania Scenic Rivers Program

    Broader source: Energy.gov [DOE]

    Rivers included in the Scenic Rivers System will be classified, designated and administered as Wild, Scenic, Pastoral, Recreational and Modified Recreational Rivers (Sections 4; (a) (1) of the...

  15. This article was downloaded by: [University of Georgia] On: 04 February 2014, At: 13:21

    E-Print Network [OSTI]

    Georgia, University of

    b a Savannah River National Laboratory, Savannah River Site, Aiken, SC 29808, USA b Savannah River. Fletcherb and Andrew M. Grosseb,y a Savannah River National Laboratory, Savannah River Site, Aiken, SC 29808, USA; b Savannah River Ecology Laboratory, University of Georgia, Aiken, SC 29808, USA (Received 30

  16. Environmental assessment for the A-01 outfall constructed wetlands project at the Savannah River Site

    SciTech Connect (OSTI)

    NONE

    1998-10-01T23:59:59.000Z

    The Department of Energy (DOE) prepared this environmental assessment (EA) to analyze the potential environmental impacts associated with the proposed A-01 outfall constructed wetlands project at the Savannah River site (SRS), located near aiken, South Carolina. The proposed action would include the construction and operation of an artificial wetland to treat effluent from the A-01 outfall located in A Area at SRS. The proposed action would reduce the outfall effluent concentrations in order to meet future outfall limits before these go into effect on October 1, 1999. This document was prepared in compliance with the National Environmental Policy Act (NEPA) of 1969, as amended; the requirements of the Council on Environmental Quality Regulations for Implementing NEPA (40 CFR Parts 1500--1508); and the DOE Regulations for Implementing NEPA (10 CFR Part 1021).

  17. Time-dependent study of Chernobyl fallout near Savannah River Site

    SciTech Connect (OSTI)

    Winn, W.G.; Kantelo, M.V.

    1989-01-01T23:59:59.000Z

    During 1986, atmospheric fallout from the Chernobyl reactor accident in April was detected from early May until late August near the Savannah River site (SRS) in Aiken, South Carolina. A total of 17 man-made nuclides were identified in the fallout, of which {sup 103}Ru, {sup 131}I, {sup 134}Cs, and {sup 137}Cs were predominant. The SRS capabilities for routine atmospheric monitoring were easily extended to study the Chernobyl fallout. The local impact of this fallout was quite minor. Calculations yielded a total inhaled dose of 0.09 {mu}Sv and a thyroid dose of 1.1 {mu}Sv. The {sup 137}Cs levels returned to preaccident levels by August. This indicates that the Chernobly fallout had only a short-term effect on airborne {sup 137}Cs concentrations, which are still dominated by historical fallout from nuclear weapons tests.

  18. HANFORD SITE RIVER CORRIDOR CLEANUP

    SciTech Connect (OSTI)

    BAZZELL, K.D.

    2006-02-01T23:59:59.000Z

    In 2005, the US Department of Energy (DOE) launched the third generation of closure contracts, including the River Corridor Closure (RCC) Contract at Hanford. Over the past decade, significant progress has been made on cleaning up the river shore that bordes Hanford. However, the most important cleanup challenges lie ahead. In March 2005, DOE awarded the Hanford River Corridor Closure Contract to Washington Closure Hanford (WCH), a limited liability company owned by Washington Group International, Bechtel National and CH2M HILL. It is a single-purpose company whose goal is to safely and efficiently accelerate cleanup in the 544 km{sup 2} Hanford river corridor and reduce or eliminate future obligations to DOE for maintaining long-term stewardship over the site. The RCC Contract is a cost-plus-incentive-fee closure contract, which incentivizes the contractor to reduce cost and accelerate the schedule. At $1.9 billion and seven years, WCH has accelerated cleaning up Hanford's river corridor significantly compared to the $3.2 billion and 10 years originally estimated by the US Army Corps of Engineers. Predictable funding is one of the key features of the new contract, with funding set by contract at $183 million in fiscal year (FY) 2006 and peaking at $387 million in FY2012. Another feature of the contract allows for Washington Closure to perform up to 40% of the value of the contract and subcontract the balance. One of the major challenges in the next few years will be to identify and qualify sufficient subcontractors to meet the goal.

  19. MACHINE AND FOUNDRY COMPANY

    Office of Legacy Management (LM)

    MACHINE AND FOUNDRY COMPANY kt '- : :' ENGINEERING DIVISIOJ ---. Cl FIELD iRIP ,REP@?T ,' i;:z;zy MEETING REPORT : .I.-.-' Y ::,:I :. &, .I7 ENGINEERING REPORT- : T, ...

  20. Capital Reporting Company Quadrennial ...

    Energy Savers [EERE]

    11-2014 (866) 448 - DEPO www.CapitalReportingCompany.com 2014 1 QUADRENNIAL ENERGY REVIEW PUBLIC MEETING 10: Infrastructure Constraints Monday, August 11, 2014 New Mexico State...

  1. Capital Reporting Company Quadrennial ...

    Office of Environmental Management (EM)

    07-21-2014 (866) 448 - DEPO www.CapitalReportingCompany.com 2014 1 QUADRENNIAL ENERGY REVIEW PUBLIC MEETING 6 MONDAY, JULY 21, 2014 HELD AT: RASHID AUDITORIUM-HILLMAN CENTER...

  2. Capital Reporting Company Quadrenntial ...

    Broader source: Energy.gov (indexed) [DOE]

    Quadrenntial Energy Review 04-21-2014 (866) 448 - DEPO www.CapitalReportingCompany.com 2014 1 NEW ENGLAND REGIONAL INFRASTRUCTURE CONSTRAINTS A Public Meeting on the Quadrennial...

  3. Breeding bird populations and habitat associations within the Savannah River Site (SRS).

    SciTech Connect (OSTI)

    Gauthreaux, Sidney, A.; Steven J. Wagner.

    2005-06-29T23:59:59.000Z

    Gauthreaux, Sidney, A., and Steven J. Wagner. 2005. Breeding bird populations and habitat associations within the Savannah River Site (SRS). Final Report. USDA Forest Service, Savannah River, Aiken, SC. 48 pp. Abstract: During the 1970's and 1980's a dramatic decline occurred in the populations of Neotropical migratory birds, species that breed in North America and winter south of the border in Central and South America and in the Caribbean. In 1991 an international initiative was mounted by U. S. governmental land management agencies, nongovernmental conservation agencies, and the academic and lay ornithological communities to understand the decline of Neotropical migratory birds in the Americas. In cooperation with the USDA Forest Service - Savannah River (FS - SR) we began 1992 a project directed to monitoring population densities of breeding birds using the Breeding Bird Census (BBC) methodology in selected habitats within the Savannah River Site SRS. In addition we related point count data on the occurrence of breeding Neotropical migrants and other bird species to the habitat data gathered by the Forest Inventory and Analysis (FIA) program of the USDA Forest Service and data on habitat treatments within forest stands.

  4. ORIGINAL ARTICLE Microarray-based whole-genome

    E-Print Network [OSTI]

    Hazen, Terry

    of Oklahoma, Norman, OK, USA; 2 Environmental Sciences Division, Oak Ridge National Laboratory, Oak Ridge, TN, Westinghouse Savannah River Company, Aiken, SC, USA; 8 Center for Microbial Ecology, Michigan State University, East Lansing, MI, USA and 9 Earth Sciences Division, Lawrence Berkeley National Laboratory, Berkeley

  5. Company Level Imports Archives

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal Stocks at CommercialDecadeReservesYear21Company Level Imports Company Level

  6. Integrated Project Management Planning for the Deactivation of the Savannah River Site F-Canyon Complex

    SciTech Connect (OSTI)

    Clark, T.G.

    2000-12-01T23:59:59.000Z

    This paper explains the planning process that is being utilized by the Westinghouse Savannah River Company to take the F-Canyon Complex facilities from operations to a deactivated condition awaiting final decommissioning.

  7. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Fix, N. J.

    2008-11-30T23:59:59.000Z

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  8. Feasibility Study Company Description

    E-Print Network [OSTI]

    Dahl, David B.

    houses which are built in areas where there is no sewer drain line. In order to covert black waters (sewage water) into irrigation water for gardens or in water that can go back by infiltration to the soil avoiding contamination to the mantle water table or their back yards or lakes and rivers close

  9. Hiring Company: Chevron Oronite Technology Group, a Chevron Company

    E-Print Network [OSTI]

    Southern California, University of

    additives for fuels and lubricating oils. We are a Global company and a subsidiary of Chevron Corporation

  10. Entrainment sampling at the Savannah River Site (SRS) Savannah River water intakes (1991)

    SciTech Connect (OSTI)

    Paller, M.

    1990-11-01T23:59:59.000Z

    Cooling water for the Westinghouse Savannah River Company (WSRC) L-Reactor, K-Reactor, and makeup water for Par Pond is pumped from the Savannah River at the 1G, 3G, and 5G pumphouses. Ichthyoplankton (drifting fish larvae and eggs) from the river are entrained into the reactor cooling systems with the river water. They are passed through the reactor heat exchangers where temperatures may reach 70{degree}C during full power operation. Ichthyoplankton mortality under such conditions is presumably 100%. Apart from a small pilot study conducted in 1989, ichthyoplankton samples have not been collected from the vicinity of the SRS intake canals since 1985. The Department of Energy (DOE) has requested that the Environmental Sciences Section (ESS) of the Savannah River Laboratory (SRL) resume ichthyoplankton sampling for the purpose of assessing entrainment at the SRS Savannah River intakes. This request is due to the anticipated restart of several SRS reactors and the growing concern surrounding striped bass and American shad stocks in the Savannah River. The following scope of work presents a sampling plan that will collect information on the spatial and temporal distribution of fish eggs and larvae near the SRS intake canal mouths. This data will be combined with information on water movement patterns near the canal mouths in order to determine the percentage of ichthyoplankton that are removed from the Savannah River by the SRS intakes. The following sampling plan incorporates improvements in experimental design that resulted from the findings of the 1989 pilot study. 1 fig.

  11. Environmental assessment for the reuse of TNX as a multi-purpose pilot plant campus at the Savannah River Site

    SciTech Connect (OSTI)

    NONE

    1998-07-01T23:59:59.000Z

    The Department of Energy (DOE) prepared this environmental assessment (EA) to analyze the potential environmental and safety impacts of DOE planning to allow asset reuse of the TNX Area at the Savannah River Site (SRS) located near Aiken, South Carolina. The proposed action would include providing for a location for the Centers of Excellence at or adjacent to SRS and entering into a cooperative agreement with a non-profit management and operations (management firm) contractor to operate and market the TNX facilities and equipment. The area (formerly TNX) would be called a Multi-Purpose Pilot Plant Campus (MPPC) and would be used: (1) as location for technology research, development, demonstration, and commercial operations; (2) to establish partnerships with industry to develop applied technologies for commercialization; and (3) serve as administrative headquarters for Centers of Excellence in the program areas of soil remediation, radioecology, groundwater contamination, and municipal solid waste minimization.

  12. No Company Is An Island

    E-Print Network [OSTI]

    Maddox, A.

    No company is an island. Utilities and their industrial customers are discovering that collaboration can breed opportunity while isolation can lead to ruin. Inter company relationships have changed over recent years and HL&P and its customers...

  13. Benham Companies ESCO Qualification Sheet

    Broader source: Energy.gov [DOE]

    Document outlines the energy service company (ESCO) qualifications for Leidos Engineering (part of Benham Companies) in relation to the U.S. Department of Energy's (DOE) energy savings performance contracts (ESPC).

  14. Red River Compact (Texas)

    Broader source: Energy.gov [DOE]

    The Red River Compact Commission administers the Red River Compact to ensure that Texas receives its equitable share of quality water from the Red River and its tributaries as apportioned by the...

  15. City of Black River Falls, Wisconsin (Utility Company) | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand JumpConceptual Model, click here.TelluricPowerCity of Aplington, Iowa

  16. PP-366 Twin Rivers Paper Company, Inc. | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the.pdfBreaking ofOilNEWResponse(Expired) | Department ofINCREASES1 Northern9-15 Trico26

  17. PP-366 Twin Rivers Paper Company, Inc. | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn'tOrigin of Contamination in235-1 Termoelectrica U.S LLC PP-235-1PP-32 EasternPP-362

  18. City of Thief River Falls, Minnesota (Utility Company) | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Siteof EnergyInnovationin UrbanCity ofCity of Spencer, IowaCitySuperior,Tenakee

  19. Preliminary Notice of Violation, Westinghouse Savannah River Company -

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn April 23, 2014, an OHA AdministrativeofDepartment of-Department| DepartmentEA-2000-02 |

  20. Preliminary Notice of Violation, Westinghouse Savannah River Company -

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn April 23, 2014, an OHA AdministrativeofDepartment of-Department| DepartmentEA-2000-02

  1. Preliminary Notice of Violation, Westinghouse Savannah River Company -

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn April 23, 2014, an OHA AdministrativeofDepartment of-Department|

  2. Preliminary Notice of Violation, Westinghouse Savannah River Company -

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn April 23, 2014, an OHA AdministrativeofDepartment of-Department|EA-97-12 | Department of

  3. Preliminary Notice of Violation, Westinghouse Savannah River Company - EA

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn April 23, 2014, an OHA AdministrativeofDepartment of-Department|EA-97-12 | Department

  4. Preliminary Notice of Violation, Westinghouse Savannah River Company - EA

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn April 23, 2014, an OHA AdministrativeofDepartment of-Department|EA-97-12 |

  5. City of Eagle River, Wisconsin (Utility Company) | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Siteof EnergyInnovationin Urban Transport |CityCity of Dayton, IowaDothan,CityDysart,

  6. City of Elk River, Minnesota (Utility Company) | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Siteof EnergyInnovationin Urban Transport |CityCity of Dayton,City of EastElba,CityCity of

  7. City of River Falls, Wisconsin (Utility Company) | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Siteof EnergyInnovationin UrbanCity of Okolona,Plummer, IdahoCity ofRed Bud,CityCity

  8. FY 2006 Washington Savannah River Company, LLC, PER Summary | National

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA Approved: 5-13-14Russianvolunteer0017 Federal

  9. FY 2007 Washington Savannah River Company, LLC, PER Summary | National

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA Approved: 5-13-14Russianvolunteer0017

  10. FY 2008 Washington Savannah River Company, LLC, PER Summary | National

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA Approved: 5-13-14Russianvolunteer0017National NuclearAdministration

  11. Enforcement Letter, Westinghouse Savannah River Company - April 15, 1997 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny:RevisedAdvisoryStandard |inHVACEnforcement Letter, WEL-2013-04 -Department

  12. Enforcement Letter, Westinghouse Savannah River Company - April 19, 2004 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny:RevisedAdvisoryStandard |inHVACEnforcement Letter, WEL-2013-04

  13. Enforcement Letter, Westinghouse Savannah River Company - July 21, 1998 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny:RevisedAdvisoryStandard |inHVACEnforcement Letter, WEL-2013-04Department of

  14. Enforcement Letter, Westinghouse Savannah River Company - June 4, 1996 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny:RevisedAdvisoryStandard |inHVACEnforcement Letter, WEL-2013-04Department

  15. Enforcement Letter, Westinghouse Savannah River Company - March 29, 2000 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny:RevisedAdvisoryStandard |inHVACEnforcement Letter, WEL-2013-04DepartmentDepartment

  16. Enforcement Letter, Westinghouse Savannah River Company - November 14, 2003

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny:RevisedAdvisoryStandard |inHVACEnforcement Letter, WEL-2013-04DepartmentDepartment|

  17. City of Park River, North Dakota (Utility Company) | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand JumpConceptual Model, clickInformation Smyrna Beach, Florida (UtilityOnida,Painesville,City

  18. City of Wood River, Nebraska (Utility Company) | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand JumpConceptual Model, clickInformation Smyrna Beach,Stuart,

  19. Borough of South River, New Jersey (Utility Company) | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Siteof EnergyInnovation in CarbonofBiotins EnergiaMilltown,Information Borough of

  20. River Basin Commissions (Indiana)

    Broader source: Energy.gov [DOE]

    This legislation establishes river basin commissions, for the Kankakee, Maumee, St. Joseph, and Upper Wabash Rivers. The commissions facilitate and foster cooperative planning and coordinated...

  1. Maine Rivers Policy (Maine)

    Broader source: Energy.gov [DOE]

    The Maine Rivers Policy accompanies the Maine Waterway Development and Conservation Act and provides additional protection for some river and stream segments, which are designated as “outstanding...

  2. SAVANNAH RIVER NATIONAL LABORATORY HYDROGEN TECHNOLOGY RESEARCH

    SciTech Connect (OSTI)

    Danko, E

    2008-02-08T23:59:59.000Z

    The Savannah River National Laboratory (SRNL) is a U.S. Department of Energy research and development laboratory located at the Savannah River Site (SRS) near Aiken, South Carolina. SRNL has over 50 years of experience in developing and applying hydrogen technology, both through its national defense activities as well as through its recent activities with the DOE Hydrogen Programs. The hydrogen technical staff at SRNL comprises over 90 scientists, engineers and technologists, and it is believed to be the largest such staff in the U.S. SRNL has ongoing R&D initiatives in a variety of hydrogen storage areas, including metal hydrides, complex hydrides, chemical hydrides and carbon nanotubes. SRNL has over 25 years of experience in metal hydrides and solid-state hydrogen storage research, development and demonstration. As part of its defense mission at SRS, SRNL developed, designed, demonstrated and provides ongoing technical support for the largest hydrogen processing facility in the world based on the integrated use of metal hydrides for hydrogen storage, separation, and compression. The SRNL has been active in teaming with academic and industrial partners to advance hydrogen technology. A primary focus of SRNL's R&D has been hydrogen storage using metal and complex hydrides. SRNL and its Hydrogen Technology Research Laboratory have been very successful in leveraging their defense infrastructure, capabilities and investments to help solve this country's energy problems. SRNL has participated in projects to convert public transit and utility vehicles for operation using hydrogen fuel. Two major projects include the H2Fuel Bus and an Industrial Fuel Cell Vehicle (IFCV) also known as the GATOR{trademark}. Both of these projects were funded by DOE and cost shared by industry. These are discussed further in Section 3.0, Demonstration Projects. In addition to metal hydrides technology, the SRNL Hydrogen group has done extensive R&D in other hydrogen technologies, including membrane filters for H2 separation, doped carbon nanotubes, storage vessel design and optimization, chemical hydrides, hydrogen compressors and hydrogen production using nuclear energy. Several of these are discussed further in Section 2, SRNL Hydrogen Research and Development.

  3. Wabash River Heritage Corridor (Indiana)

    Broader source: Energy.gov [DOE]

    The Wabash River Heritage Corridor, consisting of the Wabash River, the Little River, and the portage between the Little River and the Maumee River, is considered a protected area, where...

  4. Montana contains the headwaters for three continental watersheds-the St. Mary's River, the Columbia River, and the Missouri River. The St. Mary's

    E-Print Network [OSTI]

    Maxwell, Bruce D.

    -the largest in Montana-drains more than one half of the state's land area, but yields less than one, wind-sailing, and wildlife watching. You can float 207 miles from Montana Power Company's Morony Dam of the state. The major watersheds of Montana are those carved by the Columbia River's tributaries

  5. Regional companies eye growth

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Scienceand Requirements Recently Approved JustificationBio-Inspired PowerRegional companies eye

  6. Company Name Company Name Address Place Zip Sector Product Website

    Open Energy Info (EERE)

    Photovoltaics Spain S L REPS Renewable Energies and Photovoltaics Spain S L REPS Spain Solar Spanish solar project developer The firm is a subsidiary of Norwegian energy company...

  7. Company Name Company Name Address Place Zip Sector Product Website

    Open Energy Info (EERE)

    significantly better heating efficiency than conventional coiled wire elements A O Smith A O Smith Wisconsin Efficiency Solar Wisconsin based based company that makes both...

  8. SciTech Connect:

    Office of Scientific and Technical Information (OSTI)

    Site Office Savannah River Ecology Laboratory (SREL), Aiken, SC (United States) Savannah River National Laboratory (formerly SRTC) (United States) Savannah River Operations...

  9. 4th Annual DOE-ERSP PI Meeting: Abstracts

    E-Print Network [OSTI]

    Hazen, Terry C.

    2009-01-01T23:59:59.000Z

    Kaplan, Savannah River National Laboratory Elliot StableDaniel Kaplan, Savannah River National Laboratory (lead PI),I. Kaplan, Savannah River National Laboratory, Aiken, SC,

  10. Advanced simulation capability for environmental management (ASCEM): An overview of initial results

    E-Print Network [OSTI]

    Williamson, M.

    2012-01-01T23:59:59.000Z

    WA, USA ¶Savannah River National Laboratory, Aiken, SC,Ridge and Savannah River National Laboratory (SRNL), Idahofrom Savannah River National Laboratory. Dr. Williamson has

  11. EA-1538: Finding of No Significant Impact

    Broader source: Energy.gov [DOE]

    Safeguards and Security Upgrades for Storage of Plutonium Materials at the Savannah River Site, Aiken, South Carolina

  12. Columbia River Basin Seasonal Volumes and Statistics, 1928-1989. 1990 Level Modified Streamflows Computed Seasonal Volumes 61-Year Statistics.

    SciTech Connect (OSTI)

    A.G. Crook Company

    1993-04-01T23:59:59.000Z

    This report was prepared by the A.G. Crook Company, under contract to Bonneville Power Administration, and provides statistics of seasonal volumes and streamflow for 28 selected sites in the Columbia River Basin.

  13. Kansas Certified Development Companies (Kansas)

    Broader source: Energy.gov [DOE]

    Kansas Certified Development Companies (CDC) assist businesses by developing loan packages that meet the financial need of a project. These packages often contain multiple sources of project...

  14. Regulations For Gas Companies (Tennessee)

    Broader source: Energy.gov [DOE]

    The Regulations for Gas Companies, implemented by the Tennessee Regulatory Authority (Authority) outline the standards for metering, distribution and electricity generation for utilities using gas....

  15. Savannah River Ecology Laboratory. Annual technical progress report of ecological research

    SciTech Connect (OSTI)

    Smith, M.H.

    1996-07-31T23:59:59.000Z

    The Savannah River Ecology Laboratory (SREL) is a research unit of the University of Georgia (UGA). The overall mission of the Laboratory is to acquire and communicate knowledge of ecological processes and principles. SREL conducts basic and applied ecological research, as well as education and outreach programs, under a contract with the U.S. Department of Energy (DOE) at the Savannah River Site (SRS) near Aiken, South Carolina. Significant accomplishments were made during the past year in the areas of research, education and service. The Laboratory`s research mission was fulfilled with the publication of two books and 143 journal articles and book chapters by faculty, technical and students, and visiting scientists. An additional three books and about 80 journal articles currently are in press. Faculty, technician and students presented 193 lectures, scientific presentations, and posters to colleges and universities, including minority institutions. Dr. J Vaun McArthur organized and conducted the Third Annual SREL Symposium on the Environment: New Concepts in Strewn Ecology: An Integrative Approach. Dr. Michael Newman conducted a 5-day course titled Quantitative Methods in Ecotoxicology, and Dr. Brian Teppen of The Advanced Analytical Center for Environmental Sciences (AACES) taught a 3-day short course titled Introduction to Molecular Modeling of Environmental Systems. Dr. I. Lehr Brisbin co-hosted a meeting of the Crocodile Special Interest Group. Dr. Rebecca Sharitz attended four symposia in Japan during May and June 1996 and conducted meetings of the Executive Committee and Board of the International Association for Ecology (ENTECOL).

  16. STATISTICAL SAMPLING FOR IN-SERVICE INSPECTION OF LIQUID WASTE TANKS AT THE SAVANNAH RIVER SITE

    SciTech Connect (OSTI)

    Harris, S.; Baxter, L.

    2011-04-07T23:59:59.000Z

    Savannah River Remediation, LLC (SRR) is implementing a statistical sampling strategy for In-Service Inspection (ISI) of Liquid Waste (LW) Tanks at the United States Department of Energy's Savannah River Site (SRS) in Aiken, South Carolina. As a component of SRS's corrosion control program, the ISI program assesses tank wall structural integrity through the use of ultrasonic testing (UT). The statistical strategy for ISI is based on the random sampling of a number of vertically oriented unit areas, called strips, within each tank. The number of strips to inspect was determined so as to attain, over time, a high probability of observing at least one of the worst 5% in terms of pitting and corrosion across all tanks. The probability estimation to determine the number of strips to inspect was performed using the hypergeometric distribution. Statistical tolerance limits for pit depth and corrosion rates were calculated by fitting the lognormal distribution to the data. In addition to the strip sampling strategy, a single strip within each tank was identified to serve as the baseline for a longitudinal assessment of the tank safe operational life. The statistical sampling strategy enables the ISI program to develop individual profiles of LW tank wall structural integrity that collectively provide a high confidence in their safety and integrity over operational lifetimes.

  17. Aditya A. Shah Deere & Company,

    E-Print Network [OSTI]

    Aditya A. Shah Deere & Company, Dubuque, IA 52001 e-mail: shahadityaa@johndeere.com Christiaan J. J 30332 e-mail: chris.paredis@me.gatech.edu Roger Burkhart Deere & Company, Moline, IL 61265 e it to an example of a hydraulic log splitter. Based on this initial example, we discuss two advantages

  18. Pecos River Compact (Texas)

    Broader source: Energy.gov [DOE]

    This legislation authorizes the state's entrance into the Pecos River Compact, a joint agreement between the states of New Mexico and Texas. The compact is administered by the Pecos River Compact...

  19. Canadian River Compact (Texas)

    Broader source: Energy.gov [DOE]

    The Canadian River Commission administers the Canadian River Compact which includes the states of New Mexico, Oklahoma, and Texas. Signed in 1950 by the member states, the Compact was subsequently...

  20. Platte River Cooperative Agreement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Agreement Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Platte River Cooperative Agreement PEIS, NE, WY, CO, DOE...

  1. Company Name Company Name Address Place Zip Sector Product Website

    Open Energy Info (EERE)

    HF ReEnergy has focused its most recent efforts on the desire to create grid quality electricity from landfill waste The company also plans to focus on making existing coal plants...

  2. A variety of opportunities exist for geology graduates in the private and public sectors and in education. Petroleum companies, petroleum service companies, mining companies,

    E-Print Network [OSTI]

    and in education. Petroleum companies, petroleum service companies, mining companies, power companies, computer software companies, and entrepreneurs hire geologists for exploration, development, mining, production, hydrologist, mining geologist, oceanographer, production geologist, researcher, resource evaluator

  3. A variety of opportunities exist for geology graduates in the private and public sectors and in education. Petroleum companies, petroleum service companies, mining companies,

    E-Print Network [OSTI]

    and in education. Petroleum companies, petroleum service companies, mining companies, power companies, computer software companies, and entrepreneurs hire geologists for exploration, development, mining, production geologist, geologist, geophysicist, hydrologist, mining geologist, oceanographer, production geologist

  4. Westinghouse independent safety review of Savannah River production reactors

    SciTech Connect (OSTI)

    Leggett, W.D.; McShane, W.J. (Westinghouse Hanford Co., Richland, WA (USA)); Liparulo, N.J.; McAdoo, J.D.; Strawbridge, L.E. (Westinghouse Electric Corp., Pittsburgh, PA (USA). Nuclear and Advanced Technology Div.); Toto, G. (Westinghouse Electric Corp., Pittsburgh, PA (USA). Nuclear Services Div.); Fauske, H.K. (Fauske and Associates, Inc., Burr Ridge, IL (USA)); Call, D.W. (Westinghouse Savannah R

    1989-04-01T23:59:59.000Z

    Westinghouse Electric Corporation has performed a safety assessment of the Savannah River production reactors (K,L, and P) as requested by the US Department of Energy. This assessment was performed between November 1, 1988, and April 1, 1989, under the transition contract for the Westinghouse Savannah River Company's preparations to succeed E.I. du Pont de Nemours Company as the US Department of Energy contractor for the Savannah River Project. The reviewers were drawn from several Westinghouse nuclear energy organizations, embody a combination of commercial and government reactor experience, and have backgrounds covering the range of technologies relevant to assessing nuclear safety. The report presents the rationale from which the overall judgment was drawn and the basis for the committee's opinion on the phased restart strategy proposed by E.I. du Pont de Nemours Company, Westinghouse, and the US Department of Energy-Savannah River. The committee concluded that it could recommend restart of one reactor at partial power upon completion of a list of recommended upgrades both to systems and their supporting analyses and after demonstration that the organization had assimilated the massive changes it will have undergone.

  5. New Business Opportunity Company Description

    E-Print Network [OSTI]

    Dahl, David B.

    report and analysis Company Description: A billion dollar, middle market private equity firm. We just trading and transaction comps from relevant databases. Assist in valuing new deals and marking to market organization of radiant heating

  6. energy company opens American branch

    E-Print Network [OSTI]

    Lin, C.-Y. Cynthia

    in clean-energy investment and delivering unique projects and innovative products and servicesenergy company opens American branch in West Sacramento Substainible energy for sustainable energy supply. Ecostream markets such things as solar roof panel installations and other long

  7. How companies can leverage crowdsourcing

    E-Print Network [OSTI]

    Cheung, Sunny

    2012-01-01T23:59:59.000Z

    Crowdsourcing is an increasingly popular phenomenon where companies solicit the help of the public in helping accomplish some of the activities commonly performed by employees or contractors. These activities can range ...

  8. The valuation of construction companies

    E-Print Network [OSTI]

    Sassine, Edmond, 1980-

    2004-01-01T23:59:59.000Z

    The main objective of this thesis is to study the valuation of construction companies in mergers and acquisitions. The thesis is divided into three main parts; Mergers and Acquisitions, Valuation, and a Case Study. Mergers ...

  9. Deere & Company Energy Management Program 

    E-Print Network [OSTI]

    Darby, D. F.

    1981-01-01T23:59:59.000Z

    An overview of the Deere & Company Energy Management Program is discussed. A review is made of seven key elements which have contributed to the success of the program. Installed projects and established programs are identified and discussed...

  10. Eastern Kodak Company

    SciTech Connect (OSTI)

    Y.S. Tyan

    2009-06-30T23:59:59.000Z

    Lighting consumes more than 20% of electricity generated in the United States. Solid state lighting relies upon either inorganic or organic light-emitting diodes (OLEDs). OLED devices because of their thinness, fast response, excellent color, and efficiency could become the technology of choice for future lighting applications, provided progress is made to increase power efficiency and device lifetime and to develop cost-effective manufacturing processes. As a first step in this process, Eastman Kodak Company has demonstrated an OLED device architecture having an efficacy over 50 lm/W that exceeds the specifications of DOE Energy Star Program Requirements for Solid State Lighting. The project included work designed to optimize an OLED device, based on a stacked-OLED structure, with performance parameters of: low voltage; improved light extraction efficiency; improved internal quantum efficiency; and acceptable lifetime. The stated goal for the end of the project was delivery of an OLED device architecture, suitable for development into successful commercial products, having over 50 lum/W power efficiency and 10,000 hours lifetime at 1000 cd/m{sup 2}. During the project, Kodak developed and tested a tandem hybrid IES device made with a fluorescent blue emitter, a phosphorescent yellow emitter, and a phosphorescent red emitter in a stacked structure. The challenge was to find low voltage materials that do not absorb excessive amounts of emitted light when the extraction enhancement structure is applied. Because an extraction enhancement structure forces the emitted light to travel several times through the OLED layers before it is emitted, it exacerbates the absorption loss. A variety of ETL and HTL materials was investigated for application in the low voltage SSL device structure. Several of the materials were found to successfully yield low operating device voltages without incurring excessive absorption loss when the extraction enhancement structure was applied. An internal extraction layer comprises two essential components: a light extraction element (LEE) that does the actual extraction of emitted light and a light coupling layer (LCL) that allows the emitted light to interact with the extraction element. Modeling results show that the optical index of the LCL needs to be high, preferably higher than that of the organic layers with an n value of {approx}1.8. In addition, since the OLED structure needs to be built on top of it the LCL needs to be physically and chemically benign. As the project concluded, our focus was on the tandem hybrid device, which proved to be the more efficient architecture. Cost-efficient device fabrication will provide the next challenges with this device architecture in order to allow this architecture to be commercialized.

  11. DOE Research Set-Aside Areas of the Savannah River Site

    SciTech Connect (OSTI)

    Davis, C.E.; Janecek, L.L.

    1997-08-31T23:59:59.000Z

    Designated as the first of seven National Environmental Research Parks (NERPs) by the Atomic Energy Commission (now the Department of Energy), the Savannah River Site (SRS) is an important ecological component of the Southeastern Mixed Forest Ecoregion located along the Savannah River south of Aiken, South Carolina. Integral to the Savannah River Site NERP are the DOE Research Set-Aside Areas. Scattered across the SRS, these thirty tracts of land have been set aside for ecological research and are protected from public access and most routine Site maintenance and forest management activities. Ranging in size from 8.5 acres (3.44 ha) to 7,364 acres (2,980 ha), the thirty Set-Aside Areas total 14,005 acres (5,668 ha) and comprise approximately 7% of the Site`s total area. This system of Set-Aside Areas originally was established to represent the major plant communities and habitat types indigenous to the SRS (old-fields, sandhills, upland hardwood, mixed pine/hardwood, bottomland forests, swamp forests, Carolina bays, and fresh water streams and impoundments), as well as to preserve habitats for endangered, threatened, or rare plant and animal populations. Many long-term ecological studies are conducted in the Set-Asides, which also serve as control areas in evaluations of the potential impacts of SRS operations on other regions of the Site. The purpose of this document is to give an historical account of the SRS Set-Aside Program and to provide a descriptive profile of each of the Set-Aside Areas. These descriptions include a narrative for each Area, information on the plant communities and soil types found there, lists of sensitive plants and animals documented from each Area, an account of the ecological research conducted in each Area, locator and resource composition maps, and a list of Site-Use permits and publications associated with each Set-Aside.

  12. Savannah River Ecology Laboratory annual technical progress report of ecological research for the year ending July 31, 1995

    SciTech Connect (OSTI)

    Smith, M.H.

    1995-07-01T23:59:59.000Z

    The Savannah River Ecology Laboratory (SREL) is a research unit of the University of Georgia (UGA). The overall mission of the Laboratory is to acquire and communicate knowledge of ecological processes and principles. SREL conducts basic and applied ecological research, as well as education and outreach programs, under a contract with the US Department of Energy (DOE) at the Savannah River Site near Aiken, South Carolina. Significant accomplishments were made during the past year in the areas of research, education and service. Major additions to SREL Facilities were completed that will enhance the Laboratory`s work in the future. Following several years of planning, opening ceremonies were held for the 5000 ft{sup 2} multi-purpose conference center that was funded by the University of Georgia Research Foundation (UGARF). The center is located on 68 acres of land that was provided by the US Department of Energy. This joint effort between DOE and UGARF supports DOE`s new initiative to develop partnerships with the private sector and universities. The facility is being used for scientific meetings and environmental education programs for students, teachers and the general public. A 6000 ft{sup 2} office and library addition to S@s main building officially opened this year, and construction plans are underway on a new animal care facility, laboratory addition, and receiving building.

  13. Implementing the Pecos River Watershed Protection Plan through a Heliborne Electromagnetic (EM) Survey: Final Report

    E-Print Network [OSTI]

    Gregory, L.; Sheng, Z.; Hassan, A.; McDonald, A.; Porter, A.

    2014-01-01T23:59:59.000Z

    , completing financial status reports, hosting the program website, developing the project final report, facilitating the acceptance of bids from companies capable of collecting heliborne electromagnetic (HEM) data, awarding the HEM contract, and ultimately..., and the contract was awarded in May 2013. SkyTEM was the company that provided the bid with the best value and met data collection requirements. As a part of the Pecos River WPP Implementation Project (TSSWCB 08-08), public meetings were held in the watershed...

  14. SPD SEIS References for Appendix H | National Nuclear Security...

    National Nuclear Security Administration (NNSA)

    Analysis for Construction and Operation of a Waste Solidification Building at the Savannah River Site, DOEEIS-0283-SA-2, Savannah River Operations Office, Aiken, South...

  15. SPD SEIS References for Appendix A | National Nuclear Security...

    National Nuclear Security Administration (NNSA)

    Final Supplemental Environmental Impact Statement, Defense Waste Processing Facility, Savannah River Site, Aiken, South Carolina, DOEEIS-0082-S, Savannah River Operations...

  16. Demonstration and evaluation of the pulsed ultraviolet-irradiation gas-treatment system, Savannah River Site

    SciTech Connect (OSTI)

    Schneider, J.; Wilkey, M.; Peters, R.; Tomczyk, N.; Friedlund, J.; Farber, P. [Argonne National Lab., IL (United States). Energy Systems Div.; Mass, B.; Haag, W. [Purus, Inc., San Jose, CA (United States)

    1994-10-01T23:59:59.000Z

    Argonne National Laboratory was asked to demonstrate and evaluate a pulsed ultraviolet-irradiation system developed by Purus, Inc., at the Volatile Organic Compounds Non-Arid Integrated Demonstration at the Savannah River Site near aiken, South Carolina. The Purus system consists of four reactor chambers, each containing a xenon flash lamp. During the two weeks of testing, samples were taken and analyzed from the inlet and outlet sides of the Purus system. The contaminants of concern on the inlet were tetrachloroethylene (PCE), trichloroethylene (TCE), and 1,1,1-trichloroethane (TCA); the contaminants of concern on the outlet were PCE, TCE, TCA, carbon tetrachloride (CT), and chloroform. The evaluation of the Purus system included an examination of the reduction of both TCE and PCE and a search for any change in the concentrations. (Operating conditions included flow rates, ranging from 25 to 100 standard cubic feet per minute; inlet concentration of PCE, ranging from 360 to 10,700 parts per million volume; and flash lamp rates, ranging from 1 to 30 hertz.) The Purus system was quite efficient at reducing the concentrations of both PCE and TCE. The potential by-products, TCA, CT, and chloroform, showed no significant increases throughout the range of the various operating parameters. Overall, the Purus system appears to be a cost-efficient means of reducing the concentrations of PCE and TCE, while the removal of the initial photo-oxidation products and TCA is slower and needs further evaluation.

  17. Savannah River Site Spent Nuclear Fuel Management Final Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2000-04-14T23:59:59.000Z

    The proposed DOE action considered in this environmental impact statement (EIS) is to implement appropriate processes for the safe and efficient management of spent nuclear fuel and targets at the Savannah River Site (SRS) in Aiken County, South Carolina, including placing these materials in forms suitable for ultimate disposition. Options to treat, package, and store this material are discussed. The material included in this EIS consists of approximately 68 metric tons heavy metal (MTHM) of spent nuclear fuel 20 MTHM of aluminum-based spent nuclear fuel at SRS, as much as 28 MTHM of aluminum-clad spent nuclear fuel from foreign and domestic research reactors to be shipped to SRS through 2035, and 20 MTHM of stainless-steel or zirconium-clad spent nuclear fuel and some Americium/Curium Targets stored at SRS. Alternatives considered in this EIS encompass a range of new packaging, new processing, and conventional processing technologies, as well as the No Action Alternative. A preferred alternative is identified in which DOE would prepare about 97% by volume (about 60% by mass) of the aluminum-based fuel for disposition using a melt and dilute treatment process. The remaining 3% by volume (about 40% by mass) would be managed using chemical separation. Impacts are assessed primarily in the areas of water resources, air resources, public and worker health, waste management, socioeconomic, and cumulative impacts.

  18. DISTRIBUTION AND RANGE OF RADIONUCLIDE SORPTION COEFFICIENTS IN A SAVANNAH RIVER SITE SUBSURFACE: STOCHASTIC MODELING CONSIDERATIONS

    SciTech Connect (OSTI)

    Kaplan, D.; et. al

    2010-01-11T23:59:59.000Z

    The uncertainty associated with the sorption coefficient, or K{sub d} value, is one of the key uncertainties in estimating risk associated with burying low-level nuclear waste in the subsurface. The objective of this study was to measure >648 K{sub d} values and provide a measure of the range and distribution (normal or log-normal) of radionuclide K{sub d} values appropriate for the E-Area disposal site, within the Savannah River Site, near Aiken South Carolina. The 95% confidence level for the mean K{sub d} was twice the mean in the Aquifer Zone (18-30.5 m depth), equal to the mean for the Upper Vadose Zone (3.3-10 m depth), and half the mean for the Lower Vadose Zone (3.10-18 m depth). The distribution of K{sub d} values was log normal in the Upper Vadose Zone and Aquifer Zone, and normal in the Lower Vadose Zone. To our knowledge, this is the first report of natural radionuclide Kd variability in the literature. Using ranges and distribution coefficients that are specific to the hydrostratigraphic unit improved model accuracy and reduced model uncertainty. Unfortunately, extension of these conclusions to other sites is likely not appropriate given that each site has its own sources of hydrogeological variability. However, this study provides one of the first examples of the development stochastic ranges and distributions of K{sub d} values for a hydrological unit for stochastic modeling.

  19. Demonstration of Eastman Christensen horizontal drilling system -- Integrated Demonstration Site, Savannah River Site

    SciTech Connect (OSTI)

    Not Available

    1992-12-01T23:59:59.000Z

    An innovative horizontal drilling system was used to install two horizontal wells as part of an integrated demonstration project at the Savannah River Site (SRS), Aiken, South Carolina. The SRS is located in south-central South Carolina in the upper Coastal Plain physiographic province. The demonstration site is located near the A/M Area, and is currently known as the Integated Demonstration Site. The Department of Energy's Office of Technology Development initiated an integrated demonstration of innovative technologies for cleanup of volatile organic compounds (VOCS) in soils and groundwater at the SRS in 1989. The overall goal of the program is to demonstrate, at a single location, multiple technologies in the fields of drilling, characterization, monitoring, and remediation. Innovative technologies are compared to one another and to baseline technologies in terms of technical performance and cost effectiveness. Transfer of successfully demonstrated technologies and systems to DOE environmental restoration organizations, to other government agencies, and to industry is a critical part of the program.

  20. Demonstration of Eastman Christensen horizontal drilling system -- Integrated Demonstration Site, Savannah River Site

    SciTech Connect (OSTI)

    Not Available

    1992-12-01T23:59:59.000Z

    An innovative horizontal drilling system was used to install two horizontal wells as part of an integrated demonstration project at the Savannah River Site (SRS), Aiken, South Carolina. The SRS is located in south-central South Carolina in the upper Coastal Plain physiographic province. The demonstration site is located near the A/M Area, and is currently known as the Integated Demonstration Site. The Department of Energy`s Office of Technology Development initiated an integrated demonstration of innovative technologies for cleanup of volatile organic compounds (VOCS) in soils and groundwater at the SRS in 1989. The overall goal of the program is to demonstrate, at a single location, multiple technologies in the fields of drilling, characterization, monitoring, and remediation. Innovative technologies are compared to one another and to baseline technologies in terms of technical performance and cost effectiveness. Transfer of successfully demonstrated technologies and systems to DOE environmental restoration organizations, to other government agencies, and to industry is a critical part of the program.

  1. Treatment of M-area mixed wastes at the Savannah River Site

    SciTech Connect (OSTI)

    Not Available

    1994-06-01T23:59:59.000Z

    The Department of Energy has prepared this environmental assessment, DOE/EA-0918, to assess the potential environmental impacts of the treatment of mixed wastes currently stored in the M-Area at the Savannah River Site, near Aiken, South Carolina. DOE is proposing to treat and stabilize approximately 700,000 gallons of mixed waste currently stored in the Interim Treatment/Storage Facility (IT/SF) and Mixed Waste Storage Shed (MWSS). This waste material is proposed to be stabilized using a vitrification process and temporarily stored until final disposal is available by the year 2005. This document has been prepared to assess the potential environmental impacts attributable to the treatment and stabilization of M-area mixed wastes, the closure of the interim storage area, and storage of the vitrified waste until disposal in onsite RCRA vaults. Based on the analyses in the environmental assessment, the Department of Energy has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement is not required, and the Department of Energy is issuing this finding of no significant impact.

  2. Regional Nuclear Workforce Development in the Central Savannah...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nuclear Workforce Development in the Central Savannah River Area Dr. Susan A. Winsor Aiken Technical College President: P.O. Box 696, Aiken, SC 29802, winsors@atc.edu Mindy Mets...

  3. U.S. Department of Energy Categorical Exclusion ...

    Broader source: Energy.gov (indexed) [DOE]

    Corrosion Tests on Carbon Steel Exposed to Oxalic Acid and a Sludge Simulant Savannah River Site AikenAikenSouth Carolina Corrosion tests with carbon steel exposed to oxalic acid...

  4. U.S. Department of Energy Categorical Exclusion ...

    Broader source: Energy.gov (indexed) [DOE]

    Vapor Space Corrosion Testing of Carbon Steel Savannah River Site AikenAikenSouth Carolina Corrosion tests of carbon steel exposed to a simulant solution will be performed in...

  5. U.S. Department of Energy Categorical Exclusion ...

    Broader source: Energy.gov (indexed) [DOE]

    H-Canyon Dissolver Corrosion Rate Assessment Savannah River Site AikenAikenSouth Carolina This is an EEC to cover the corrosion testing of materials in aqueous solutions which...

  6. CX-002208: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Monitor Instruments Mass Spectrometer at Aiken County Technology LaboratoryCX(s) Applied: B3.6Date: 04/16/2010Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office

  7. U.S. Department of Energy Categorical Exclusion ...

    Broader source: Energy.gov (indexed) [DOE]

    Cleaning of Depleted Uranium metal Savannah River Site AikenAikenSouth Carolina Depleted Uranium (DU) metal will be 1) degreased using either ethanol or hexane 2) dried, then 3)...

  8. U.S. Department of Energy Categorical Exclusion ...

    Broader source: Energy.gov (indexed) [DOE]

    Fabrication of alloys with trace depleted uranium in 1750 C tube furnace with argon cover in D-0142 Savannah River Site AikenAikenSouth Carolina A commercial, argon atmosphere...

  9. U.S. Department of Energy Categorical Exclusion ...

    Broader source: Energy.gov (indexed) [DOE]

    Removal of Out-of-Service Steam Line Segment; D-Area to Ameresco Biomass Cogeneration Facility Savannah River Site AikenAikenSouth Carolina Dismantle and removal (D&R) of the...

  10. U.S. Department of Energy Categorical Exclusion ...

    Broader source: Energy.gov (indexed) [DOE]

    Vacuum System Testing for 235-F Risk Reduction Project Savannah River Site AikenAikenSouth Carolina Testing of a vacuum system using "Pixie Dust" simulant. B3.6 - Small-scale...

  11. Environmental Assessment for the construction and operation of the Three Rivers Solid Waste Authority regional waste management center at the Savannah River Site

    SciTech Connect (OSTI)

    NONE

    1995-12-01T23:59:59.000Z

    This Environmental Assessment (EA) has been prepared by the US Department of Energy (DOE) to assess the potential environmental impacts associated with the construction and operation of a landfill and technology center for regionally-generated municipal solid waste at the Savannah River Site (SRS) near Aiken, South Carolina. The facility would serve the municipal solid waste disposal needs for SRS and at least nine of the surrounding counties who currently comprise the Three Rivers Solid Waste Authority (TRSWA). Additional counties could become included in the proposed action at some future date. Current Federal and state requirements do not afford individual counties and municipalities within the region encompassing SRS the ability to efficiently or economically operate modern waste management facilities. In addition, consolidation of regional municipal solid waste at one location would have the benefit of reducing the duplicity of environmental consequences associated with the construction and operation of county-level facilities. The option to seek a combined disposal and technology development facility based on a regionally-cooperative effort was selected as a viable alternative to the existing individual SRS or county disposal activities. This document was prepared in compliance with the National Environmental Policy Act (NEPA) of 1969, as amended, the requirements of the Council on Environmental Quality Regulations for Implementing NEPA (40 CFR Part 1021). NEPA requires the assessment of environmental consequences of Federal actions that may affect the quality of the human environment. Based on the potential for impacts described for impacts described herein, DOE will either publish a Finding of No Significant Impact or prepare an environmental impact statement (EIS).

  12. Saving a Dwindling River

    E-Print Network [OSTI]

    Wythe, Kathy

    2007-01-01T23:59:59.000Z

    information on this research is available by downloading TWRI Technical Report 291, ?Reconnaissance Survey of Salt Sources and Loading into the Pecos River,? at http://twri.tamu.edu/reports.php. The research team has also compared flow and salinity data from... Water Act, Section 319 from the U.S. Environmental Protection Agency. ?The river?s importance?historically, biologically, hydrologically and economically?to the future of the entire Pecos River Basin and the Rio Grande is huge,? said Will Hatler, project...

  13. Sabine River Compact (Multiple States)

    Broader source: Energy.gov [DOE]

    The Sabine River Compact Commission administers the Sabine River Compact to ensure that Texas receives its equitable share of quality water from the Sabine River and its tributaries as apportioned...

  14. Natural gas annual 1993 supplement: Company profiles

    SciTech Connect (OSTI)

    Not Available

    1995-02-01T23:59:59.000Z

    The Natural Gas Annual provides information on the supply and disposition of natural gas to a wide audience including industry, consumers, Federal and State agencies, and educational institutions. This report, the Natural Gas Annual 1993 Supplement: Company Profiles, presents a detailed profile of 45 selected companies in the natural gas industry. The purpose of this report is to show the movement of natural gas through the various States served by the companies profiled. The companies in this report are interstate pipeline companies or local distribution companies (LDC`s). Interstate pipeline companies acquire gas supplies from company owned production, purchases from producers, and receipts for transportation for account of others. Pipeline systems, service area maps, company supply and disposition data are presented.

  15. River Edge Redevelopment Zone (Illinois)

    Broader source: Energy.gov [DOE]

    The purpose of the River Edge Redevelopment Program is to revive and redevelop environmentally challenged properties adjacent to rivers in Illinois.

  16. HYDROGEN TECHNOLOGY RESEARCH AT THE SAVANNAH RIVER NATIONAL LABORATORY

    SciTech Connect (OSTI)

    Danko, E

    2009-03-02T23:59:59.000Z

    The Savannah River National Laboratory (SRNL) is a U.S. Department of Energy research and development laboratory located at the Savannah River Site (SRS) near Aiken, South Carolina. SRNL has over 50 years of experience in developing and applying hydrogen technology, both through its national defense activities as well as through its recent activities with the DOE Hydrogen Programs. The hydrogen technical staff at SRNL comprises over 90 scientists, engineers and technologists, and it is believed to be the largest such staff in the U.S. SRNL has ongoing R&D initiatives in a variety of hydrogen storage areas, including metal hydrides, complex hydrides, chemical hydrides and carbon nanotubes. SRNL has over 25 years of experience in metal hydrides and solid-state hydrogen storage research, development and demonstration. As part of its defense mission at SRS, SRNL developed, designed, demonstrated and provides ongoing technical support for the largest hydrogen processing facility in the world based on the integrated use of metal hydrides for hydrogen storage, separation, and compression. The SRNL has been active in teaming with academic and industrial partners to advance hydrogen technology. A primary focus of SRNL's R&D has been hydrogen storage using metal and complex hydrides. SRNL and its Hydrogen Technology Research Laboratory have been very successful in leveraging their defense infrastructure, capabilities and investments to help solve this country's energy problems. SRNL has participated in projects to convert public transit and utility vehicles for operation using hydrogen fuel. Two major projects include the H2Fuel Bus and an Industrial Fuel Cell Vehicle (IFCV) also known as the GATOR{trademark}. Both of these projects were funded by DOE and cost shared by industry. These are discussed further in Section 3.0, Demonstration Projects. In addition to metal hydrides technology, the SRNL Hydrogen group has done extensive R&D in other hydrogen technologies, including membrane filters for H2 separation, doped carbon nanotubes, storage vessel design and optimization, chemical hydrides, hydrogen compressors and hydrogen production using nuclear energy. Several of these are discussed further in Section 2, SRNL Hydrogen Research and Development.

  17. Oil and Gas Company Oil and Gas Company Address Place Zip Website

    Open Energy Info (EERE)

    Dhahran Saudi Arabia http www saudiaramco com en home html Saudi Aramco Mobile Refinery Company SAMREF Saudi Aramco Mobile Refinery Company SAMREF P O Box Yanbu S audi...

  18. Reed-Joseph International Company

    E-Print Network [OSTI]

    is offering field downloadable GPS/VHF logging collars and Solar Powered GPS/VHF backpack loggers for birds of battery powered and solar powered PTTs in a wide range of sizes, exclusively for birds. We will startReed-Joseph International Company 55 YEARS OF EXCELLENCE IN BIRD AND WILDLIFE CONTROL THE U

  19. IBM Software Lincoln Trust Company

    E-Print Network [OSTI]

    into account several "lessons learned" from the company's past pre-divestiture past. A process improve- ment team had existed several years prior, but was decommissioned due to lack of meaningful automation, there were also lessons from the past that needed to be integrated into the new program. Prior attempts

  20. Energy Management at Deere & Company 

    E-Print Network [OSTI]

    Boyd, M. P.

    1979-01-01T23:59:59.000Z

    Deere & Company appreciates the opportunity to discuss energy management and conservation with you. Energy is a topic that will occupy our thoughts for many years to come and certainly will be in the forefront in the near future. It is a subject...

  1. Natural gas annual 1992: Supplement: Company profiles

    SciTech Connect (OSTI)

    Not Available

    1994-01-01T23:59:59.000Z

    The data for the Natural Gas Annual 1991 Supplement : Company Profiles are taken from Form EIA-176, (open quotes) Annual Report of Natural and Supplemental Gas Supply and Disposition (close quotes). Other sources include industry literature and corporate annual reports to shareholders. The companies appearing in this report are major interstate natural gas pipeline companies, large distribution companies, or combination companies with both pipeline and distribution operations. The report contains profiles of 45 corporate families. The profiles describe briefly each company, where it operates, and any important issues that the company faces. The purpose of this report is to show the movement of natural gas through the various States served by the 45 large companies profiled.

  2. Designing for cost In an aerospace company

    E-Print Network [OSTI]

    Hammar, Elizabeth (Elizabeth Deming)

    2014-01-01T23:59:59.000Z

    Companies take different approaches, and achieve different degrees of implementation, in designing products for cost. This thesis discusses Target Costing and its application at The Boeing Company. Target Costing is a ...

  3. Southern Company: DOE Smart Grid RFI Addressing Policy and Logistical...

    Broader source: Energy.gov (indexed) [DOE]

    Southern Company: DOE Smart Grid RFI Addressing Policy and Logistical Challenges Southern Company: DOE Smart Grid RFI Addressing Policy and Logistical Challenges Southern Company:...

  4. LETTER TO SUCCESSFUL COMPANY OR ESCO | Department of Energy

    Office of Environmental Management (EM)

    SUCCESSFUL COMPANY OR ESCO LETTER TO SUCCESSFUL COMPANY OR ESCO Document features a letter template and sample to help Federal agencies inform an energy services company (ESCO)...

  5. LETTER TO UNSUCCESSFUL COMPANY OR ESCO | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    UNSUCCESSFUL COMPANY OR ESCO LETTER TO UNSUCCESSFUL COMPANY OR ESCO Document features a letter template and sample to help Federal agencies inform energy service companies (ESCOs)...

  6. Nevada Geothermal Power Company, Inc. (Blue Mountain) | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nevada Geothermal Power Company, Inc. (Blue Mountain) Nevada Geothermal Power Company, Inc. (Blue Mountain) Nevada Geothermal Power Company, Inc. (Blue Mountain) Nevada Geothermal...

  7. Energy Audit Helps Small Company Stay Competitive

    Broader source: Energy.gov [DOE]

    The recommended improvements are saving the West Linn Paper Company in Oregon an annual cost of about $380,000.

  8. UNDERSTANDING OUR COMPANY AN IBM PROSPECTUS

    E-Print Network [OSTI]

    a company or planned venture so that individuals can make informed decisions. Fully understanding the future lay in consolidation, and chose to bulk up. And then some companies just concluded that their core confidence in IBM's future. We have done much in recent years to transform our company. In a number

  9. ENERGY SERVICES COMPANIES SUMMARY OF RESPONSES

    E-Print Network [OSTI]

    a survey of the Energy Services Companies doing business in California. An Energy Services Company (ESCO. In addition, an ESCO frequently guarantees that the project's energy cost savings will be adequate to payCALIFORNIA ENERGY COMMISSION SUMMARY OF ENERGY SERVICES COMPANIES SUMMARY OF RESPONSES STAFFREPORT

  10. ESPC ENABLE Energy Service Companies

    Broader source: Energy.gov [DOE]

    Energy Savings Performance Contract (ESPC) ENABLE projects use General Services Administration (GSA) Federal Supply Schedule 84, SIN 246-53 to select a qualified energy service company (ESCO). The ESCO is required to go through a two-step qualification process to become an eligible ESPC ENABLE or Schedule 84 service provider. The two-step process includes first, becoming Department of Energy (DOE)- qualified and second, being awarded a contract under the GSA Schedule.

  11. Illinois Company Implementing Solar Energy

    Office of Energy Efficiency and Renewable Energy (EERE)

    J.F. Family Limited Partnership has been awarded $191,000 through the Recovery Act toward the use of solar energy at its Lakefront Parkway property in Edwardsville, Ill., which is the company headquarters for J.F. Electric Inc. The funding will be used to install a 75-kW solar photovoltaic system on the building’s roof, creating electricity on-site and creating or saving a total of 14 jobs.

  12. On tropospheric rivers

    E-Print Network [OSTI]

    Hu, Yuanlong, 1964-

    2002-01-01T23:59:59.000Z

    In this thesis, we investigate atmospheric water vapor transport through a distinct synoptic phenomenon, namely, the Tropospheric River (TR), which is a local filamentary structure on a daily map of vertically integrated ...

  13. Deere & Company Energy Management Program

    E-Print Network [OSTI]

    Darby, D. F.

    1981-01-01T23:59:59.000Z

    for evaluating each unit's ene~gy savings techniques. Two more key elements merit attention. These are "energy ethic" and "feedback". The people that comprise a company can enhance a conservation program if they are convinced it is for their good as well... vital but "good business" as well. Meet Lester! One of our factories has had an an:i mated movie produced which ~eatures a polar bear: hero. He represents the central theme of an ene~gy conservation awareness program. The program con~ tinues...

  14. Broin Companies | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: Theof Energy Future of CSP: ChallengesEnergyEnergyBroin Companies

  15. Wyrulec Company | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTownDells, Wisconsin: EnergyWyandanch, New York:State ParksWyrulec Company Jump to:

  16. Benjamin Company | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Siteof Energy 2,AUDIT REPORT Americium/CuriumAguaBBBWind LtdFengliBenjamin Company Jump

  17. DISTRIBUTION AND RANGE OF RADIONUCLIDE SORPTIOIN COEFFICIENTS IN A SAVANNAH RIVER SITE SUBSURFACE: STOCHASTIC MODELING CONSIDERATIONS - 10259

    SciTech Connect (OSTI)

    Kaplan, D.

    2010-01-04T23:59:59.000Z

    The uncertainty associated with the sorption coefficient, or K{sub d} value, is one of the key uncertainties in estimating risk associated with burying low-level nuclear waste in the subsurface. The objective of this study was to measure >648 K{sub d} values and provide a measure of the range and distribution (normal or log-normal) of radionuclide K{sub d} values appropriate for the E-Area disposal site, within the Savannah River Site, near Aiken South Carolina. The 95% confidence level for the mean K{sub d} was twice the mean in the Aquifer Zone (18-30.5 m depth), equal to the mean for the Upper Vadose Zone (3.3-10 m depth), and half the mean for the Lower Vadose Zone (3.3-18 m depth). The distribution of K{sub d} values was log normal in the Upper Vadose Zone and Aquifer Zone, and normal in the Lower Vadose Zone. To our knowledge, this is the first report of natural radionuclide K{sub d} variability in the literature. Using ranges and distribution coefficients that are specific to the hydrostratigraphic unit improved model accuracy and reduced model uncertainty. Unfortunately, extension of these conclusions to other sites is likely not appropriate given that each site has its own sources of hydrogeological variability. However, this study provides one of the first examples of the development stochastic ranges and distributions of K{sub d} values for a hydrological unit for stochastic modeling.

  18. State of the art design: A closure system for the largest hazardous waste landfill at the Savannah River Site

    SciTech Connect (OSTI)

    Bartlett, S.F.; Serrato, M.G.; McMullin, S.R.

    1992-12-31T23:59:59.000Z

    This paper discusses the cover system proposed for a 55-acre, hazardous waste closure of the sanitary landfill at the Savannah River Site, near Aiken, South Carolina. The proposed cover system has been designed to accommodate a significant amount of post-closure settlement while maintaining a permeability of 1 {times} 10{sup {minus}7} cm/s or less throughout its 30-year, regulatory lifetime. A composite cover consisting of a geomembrane (GM) underlain by a geosynthetic clay liner (GCL) was selected because of its extremely low permeability, ability to elongate without tearing, and capacity to ``self-heal`` if punctured. These characteristics will enable the cover system to accommodate differential settlement without cracking or tearing, this providing long-term protection with minimal maintenance. Also, to improve the ability of the cover system to span voids that may develop in the underlying waste, a geogrid has been included in the foundation layer. A gas vent layer has been included to allow for the safe collection and venting of landfill gases.

  19. State of the art design: A closure system for the largest hazardous waste landfill at the Savannah River Site

    SciTech Connect (OSTI)

    Bartlett, S.F.; Serrato, M.G.; McMullin, S.R.

    1992-01-01T23:59:59.000Z

    This paper discusses the cover system proposed for a 55-acre, hazardous waste closure of the sanitary landfill at the Savannah River Site, near Aiken, South Carolina. The proposed cover system has been designed to accommodate a significant amount of post-closure settlement while maintaining a permeability of 1 [times] 10[sup [minus]7] cm/s or less throughout its 30-year, regulatory lifetime. A composite cover consisting of a geomembrane (GM) underlain by a geosynthetic clay liner (GCL) was selected because of its extremely low permeability, ability to elongate without tearing, and capacity to self-heal'' if punctured. These characteristics will enable the cover system to accommodate differential settlement without cracking or tearing, this providing long-term protection with minimal maintenance. Also, to improve the ability of the cover system to span voids that may develop in the underlying waste, a geogrid has been included in the foundation layer. A gas vent layer has been included to allow for the safe collection and venting of landfill gases.

  20. New Mexico Gas Company- Commercial Efficiency Programs

    Broader source: Energy.gov [DOE]

    The New Mexico Gas Company Commercial Energy Efficiency programs provide energy savings for businesses using natural gas for cooking and water heating. Prescriptive incentives for specified...

  1. Panasonic Corporation Energy Company formerly Matsushita Battery...

    Open Energy Info (EERE)

    to: navigation, search Name: Panasonic Corporation Energy Company (formerly Matsushita Battery Industrial Co) Place: Moriguchi, Osaka, Japan Zip: 570-8511 Product: Producer of...

  2. Colonial Pipeline Company Timothy C. Felt

    Broader source: Energy.gov (indexed) [DOE]

    that are critically important to our nation's economy. History In 1961, a handful of energy companies came together to build what was then the single largest privately funded...

  3. POWER PURCHASE AGREEMENT DELMARVA POWER & LIGHT COMPANY

    E-Print Network [OSTI]

    Firestone, Jeremy

    POWER PURCHASE AGREEMENT between DELMARVA POWER & LIGHT COMPANY ("Buyer") and BLUEWATER WIND 3.5 Energy Forecasts, Scheduling and Balancing.......................................... 39 3

  4. MENTOR MEET New Student/Company Information

    E-Print Network [OSTI]

    MENTOR MEET New Student/Company Information Venture Connection Mentor Meet Info ________ Mentoring ________ Funding ________ NEXT STEPS - Office use Mentor: Actions Who By Date Other

  5. Aiken Electric Cooperative Inc | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Siteof Energy 2,AUDITCaliforniaWeifangwikiAgoura Hills,Oeste Paulista JumpResearch

  6. Rivanna River Basin Commission (Virginia)

    Broader source: Energy.gov [DOE]

    The Rivanna River Basin Commission is an independent local entity tasked with providing guidance for the stewardship and enhancement of the water quality and natural resources of the Rivanna River...

  7. Yellowstone River Compact (North Dakota)

    Broader source: Energy.gov [DOE]

    The Yellowstone River Compact, agreed to by the States of Montana, North Dakota, and Wyoming, provides for an equitable division and apportionment of the waters of the Yellowstone River, as well as...

  8. P. Julien S. Ikeda River Engineering and

    E-Print Network [OSTI]

    Julien, Pierre Y.

    1 P. Julien S. Ikeda River Engineering and Stream Restoration Pierre Y. Julien Hong Kong - December 2004 River Engineering and Stream Restoration I - Stream Restoration Objectives Brief overview of River Engineering and Stream Restoration with focus on : 1. River Equilibrium; 2. River Dynamics; 3. River

  9. The Bowersock Mills and Power Company 1874

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    - Project Engineer * Civil, Structural, Mechanical, Geotechnical, Electrical & some hydraulic eg river study * Some Permitting - Non-FERC + highly involved providing data for...

  10. (Data in thousand metric tons of metal, unless otherwise noted) Domestic Production and Use: In 2002, 11 companies operated 16 primary aluminum reduction plants; 6 smelters

    E-Print Network [OSTI]

    and Use: In 2002, 11 companies operated 16 primary aluminum reduction plants; 6 smelters were temporarily idled. The 11 smelters east of the Mississippi River accounted for 75% of the production; whereas the remaining 11 smelters, which included the 9 Pacific Northwest smelters, accounted for only 25%. Based upon

  11. Pecos River Ecosystem Monitoring Project

    E-Print Network [OSTI]

    McDonald, A.; Hart, C.

    2004-01-01T23:59:59.000Z

    TR- 272 2004 Pecos River Ecosystem Monitoring Project C. Hart A. McDonald Texas Water Resources Institute Texas A&M University - 146 - 2003 Pecos River Ecosystem Monitoring Project... Charles R. Hart, Extension Range Specialist, Fort Stockton Alyson McDonald, Extension Assistant – Hydrology, Fort Stockton SUMMARY The Pecos River Ecosystem Project is attempting to minimize the negative impacts of saltcedar on the river ecosystem...

  12. Rio Grande River

    E-Print Network [OSTI]

    Hills Photo Shop

    2011-09-05T23:59:59.000Z

    FORKS BIRDBEAR-NISKU JEFFERSON GROUP DUPEROW O (IJ o BEAVER HILL LAKE GR UP ELK POINT GROUP SOURIS RIVER Ist. RED BED DAWSON BAY 2ll(IRED BED PRAIRIE EVAP WI NI ASHERN INTERLAKE STONY MOUNTAIN RED RIVER WINN IP EG Figure 3... and is bounded by the Sioux Arch, the Black Hills Uplift, the Miles City Arch, and the Bowdoin Dome. The structural trends within the basin parallel the major structural trends of the Rocky Mountain Belt. The Williston Basin is characterized by gently...

  13. Savannah River site environmental report for 1996

    SciTech Connect (OSTI)

    Arnett, M.; Mamatey, A. [eds.

    1998-12-31T23:59:59.000Z

    The mission at the Savannah River Site (SRS) has changed from the production of nuclear weapons materials for national defense to the management of site-generated waste, restoration of the surrounding environment, and the development of industry in and around the site. However, SRS-through its prime operating contractor, Westinghouse Savannah River Company (WSRC)-continues to maintain a comprehensive environmental monitoring program. In 1996, effluent monitoring and environmental surveillance were conducted within a 31,000-square-mile area in and around SRS that includes neighboring cities, towns, and counties in Georgia and South Carolina and extends up to 100 miles from the site. Though the environmental monitoring program was streamlined in 1996-to improve its cost-effectiveness without compromising data quality or reducing its overall ability to produce critical information-thousands of samples of air, surface water, groundwater, food products, drinking water, wildlife, rainwater, soil, sediment, and vegetation were collected and analyzed for radioactive and nonradioactive contaminants.

  14. Muddy River Restoration Project Begins

    E-Print Network [OSTI]

    US Army Corps of Engineers

    Muddy River Restoration Project Begins Page 5 #12;2 YANKEE ENGINEER February 2013 Yankee Voices of the Muddy River Restoration project. Inset photo: Flooding at the Muddy River. Materials provided by Mike Project Manager, on the passing of his father in law, Francis James (Jim) Murray, Jan. 9. ... to Laura

  15. FLOOD WARNING SYSTEM JOHNSTONE RIVER

    E-Print Network [OSTI]

    Greenslade, Diana

    Warning Centre in Brisbane. The system provides early warning of heavy rainfall and river risesFLOOD WARNING SYSTEM for the JOHNSTONE RIVER This brochure describes the flood warning system ALERT System Flood Warnings and Bulletins Interpreting Flood Warnings and River Height Bulletins Flood

  16. FLOOD WARNING SYSTEM NERANG RIVER

    E-Print Network [OSTI]

    Greenslade, Diana

    ALERT System The Nerang River ALERT flood warning system was completed in the early 1990's as a coFLOOD WARNING SYSTEM for the NERANG RIVER This brochure describes the flood warning system operated Nerang ALERT System Flood Warnings and Bulletins Interpreting Flood Warnings and River Height Bulletins

  17. B Allison Adams, BSBA `91 Caspers Company

    E-Print Network [OSTI]

    Wu, Dapeng Oliver

    Jeremy Foley UF Athletic Association B Kristen Foley Nielsen B Dr. James R. Follain Nelson A. Rockefeller Acquisition Center B Darin Cook, BS `87 Infinite Energy B Kyle Cooper, BSBA `05 Orlando Predators B James Columbia Timber Company B Katie Davis James Moore & Company B Stuart Davis, BSAc '80, MAcc `81 Titan

  18. Company number 5857955 Wellcome Trust Finance plc

    E-Print Network [OSTI]

    Rambaut, Andrew

    Company number 5857955 Wellcome Trust Finance plc Annual Report and Financial Statements Year ended 30 September 2012 #12;Company number 5857955 Wellcome Trust Finance plc Contents Page Directors Trust Finance plc Directors' Report for the year ended 30 September 2012 Report of the Directors

  19. Company number 5857955 Wellcome Trust Finance plc

    E-Print Network [OSTI]

    Rambaut, Andrew

    Company number 5857955 Wellcome Trust Finance plc Annual Report and Financial Statements Year ended 30 September 2013 #12;Company number 5857955 Wellcome Trust Finance plc Contents Page Directors Trust Finance plc Directors' Report For the year ended 30 September 2013 Report of the Directors

  20. Researching Careers, Industries, and Companies Tracie Thomas

    E-Print Network [OSTI]

    Shull, Kenneth R.

    /Industry ­ Increased certainty when selecting an internship ­ Demonstrates a sincere interest in working this internship?" "I have always been interested in working in Finance, and Ford Motor Company is a well-know company" OR " I am very interested in working for a top-3 automaker in the US especially since Ford

  1. Savannah River Site Robotics

    SciTech Connect (OSTI)

    None

    2010-01-01T23:59:59.000Z

    Meet Sandmantis and Frankie, two advanced robotic devices that are key to cleanup at Savannah River Site. Sandmantis cleans hard, residual waste off huge underground storage tanks. Frankie is equipped with unique satellite capabilities and sensing abilties that can determine what chemicals still reside in the tanks in a cost effective manner.

  2. Savannah River Site Robotics

    ScienceCinema (OSTI)

    None

    2012-06-14T23:59:59.000Z

    Meet Sandmantis and Frankie, two advanced robotic devices that are key to cleanup at Savannah River Site. Sandmantis cleans hard, residual waste off huge underground storage tanks. Frankie is equipped with unique satellite capabilities and sensing abilties that can determine what chemicals still reside in the tanks in a cost effective manner.

  3. Rainfall-River Forecasting

    E-Print Network [OSTI]

    US Army Corps of Engineers

    ;2Rainfall-River Forecasting Joint Summit II NOAA Integrated Water Forecasting Program · Minimize losses due management and enhance America's coastal assets · Expand information for managing America's Water Resources, Precipitation and Water Quality Observations · USACE Reservoir Operation Information, Streamflow, Snowpack

  4. Results of a baseflow tritium survey of surface water in Georgia across from the Savannah River Site

    SciTech Connect (OSTI)

    Nichols, R.L.

    1993-03-03T23:59:59.000Z

    In October 1991 the Georgia Department of Natural Resources (GDNR) issued a press release notifying the public that tritium had been measured in elevated levels (1,200 - 1,500 pCi/1) in water samples collected from drinking water wells in Georgia across from the Savannah River Site in Aiken Co. South Carolina. None of the elevated results were above the Primary Drinking Water Standard for tritium of 20,000 pCi/l. The GDNR initiated 2 surveys to determine the source and extent of elevated tritium: (1) baseflow survey of surface water quality, and (2) well evaluation program. Results from the 2 surveys indicate that the tritium measured in groundwater wells in Georgia is not the result of a groundwater flow from South Carolina under the Savannah River and into Georgia. Atmospheric transport and consequent rainout and infiltration has resulted in an increase of tritium in the water-table aquifer in the vicinity. Water samples collected from drinking water wells believed to have been installed in the aquifer beneath the water-table aquifer were actually from the shallower water-table aquifer. Water samples collected from the wells contain the amount of tritium expected for the water-table aquifer in the sample area. The measured tritium levels in the well samples and baseflow samples do not exceed Primary Drinking Water Standards. Tritium levels in the water-table in Georgia will decline as the atmospheric releases from SRS decline, tritium undergoes natural decay, and infiltration water with less tritium flushes through the subsurface.

  5. New Composite Membranes for High Throughput Solid-Liquid Separations at the Savannah River Site

    SciTech Connect (OSTI)

    Bhave, Ramesh R [ORNL

    2012-01-01T23:59:59.000Z

    New Composite Membranes for High Throughput Solid-Liquid Separations at the Savannah River Site R. Bhave (Oak Ridge National Laboratory. Oak Ridge, TN) and M. R. Poirier* (Savannah River National Laboratory, Aiken SC) Solid-liquid separation is the limiting step for many waste treatment processes at the Savannah River Site. SRNL researchers have identified the rotary microfilter as a technology to improve the rate of solid-liquid separation processes. SRNL is currently developing the rotary microfilter for radioactive service and plans to deploy the technology as part of the small column ion exchange process. The rotary microfilter can utilize any filter media that is available as a flat sheet. The current baseline membrane is a 0.5 micron (nominal) porous metal filter (Pall PMM050). Previous testing with tubular filters showed that filters composed of a ceramic membrane on top of a stainless steel support produce higher flux than filters composed only of porous metal. The authors are working to develop flat sheet filter media composed of a ceramic membrane and/or ceramic-metal composite on top of a porous stainless steel support that can be used with the rotary microfilter to substantially increase filter flux resulting in a more compact, energy efficient and cost-effective high level radioactive waste treatment system. Composite membranes with precisely controlled pore size distribution were fabricated on porous metal supports. High quality uniform porous metal (316SS) supports were fabricated to achieve high water permeability. Separative layers of several different materials such as ultrafine metal particles and ceramic oxides were used to fabricate composite membranes. The fabrication process involved several high temperature heat treatments followed by characterization of gas and liquid permeability measurements and membrane integrity analysis. The fabricated composite membrane samples were evaluated in a static test cell manufactured by SpinTek. The composite membranes were evaluated on several feed slurries: 1 wt. % strontium carbonate in deionized water, 1 wt. % monosodium titanate in simulated salt solution, and 1 wt. % simulated sludge in simulated salt solution and deionized water. Flux as a function of feed flow rate and transmembrane pressure was measured for each of the above described feed slurries. The authors will discuss the new membrane development efforts, waste slurry filtration performance evaluations and scale-up considerations.

  6. Savannah River Site Footprint Reduction Results under the American Recovery and Reinvestment Act - 13302

    SciTech Connect (OSTI)

    Flora, Mary [Savannah River Nuclear Solutions Bldg. 730-4B, Aiken, SC 29808 (United States)] [Savannah River Nuclear Solutions Bldg. 730-4B, Aiken, SC 29808 (United States); Adams, Angelia [United States Department of Energy Bldg. 730-B, Aiken, SC 29808 (United States)] [United States Department of Energy Bldg. 730-B, Aiken, SC 29808 (United States); Pope, Robert [United States Environmental Protection Agency Region IV Atlanta, GA 30303 (United States)] [United States Environmental Protection Agency Region IV Atlanta, GA 30303 (United States)

    2013-07-01T23:59:59.000Z

    The Savannah River Site (SRS) is an 802 square-kilometer United States Department of Energy (US DOE) nuclear facility located along the Savannah River near Aiken, South Carolina, managed and operated by Savannah River Nuclear Solutions. Construction of SRS began in the early 1950's to enhance the nation's nuclear weapons capability. Nuclear weapons material production began in the early 1950's, eventually utilizing five production reactors constructed to support the national defense mission. Past operations have resulted in releases of hazardous constituents and substances to soil and groundwater, resulting in 515 waste sites with contamination exceeding regulatory thresholds. More than 1,000 facilities were constructed onsite with approximately 300 of them considered radiological, nuclear or industrial in nature. In 2003, SRS entered into a Memorandum of Agreement with its regulators to accelerate the cleanup using an Area Completion strategy. The strategy was designed to focus cleanup efforts on the 14 large industrial areas of the site to realize efficiencies of scale in the characterization, assessment, and remediation activities. This strategy focuses on addressing the contaminated surface units and the vadose zone and addressing groundwater plumes subsequently. This approach streamlines characterization and remediation efforts as well as the required regulatory documentation, while enhancing the ability to make large-scale cleanup decisions. In February 2009, Congress approved the American Reinvestment and Recovery Act (ARRA) to create jobs and promote economic recovery. At SRS, ARRA funding was established in part to accelerate the completion of environmental remediation and facility deactivation and decommissioning (D and D). By late 2012, SRS achieved 85 percent footprint reduction utilizing ARRA funding by accelerating and coupling waste unit remediation with D and D of remnant facilities. Facility D and D activities were sequenced and permitted with waste unit remediation activities to streamline regulatory approval and execution. Achieving footprint reduction fulfills the Government's responsibility to address legacy contamination; allows earlier completion of legally enforceable compliance agreement milestones; and enables future potential reuse of DOE resources, including land and infrastructure for other missions. Over the last 3.5 years significant achievements were met that contributed to footprint reduction, including the closure of 41 waste units (including 20 miles of radiologically contaminated stream) and decommissioning of 30 facilities (including the precedent setting in situ closure of two former production reactors, the first in the DOE Complex). Other notable achievements included the removal of over 39,750 cubic meters of debris and 68,810 cubic meters of contaminated soils, including 9175 cubic meters of lead-contaminated soil from a former site small arms testing range and treatment of 1,262 cubic meters of tritium-laden soils and concrete using a thermal treatment system. (authors)

  7. Tennessee Small Business Investment Company Credit Act (Tennessee)

    Broader source: Energy.gov [DOE]

    The Tennessee Small Business Company Credit Act offers $120 million in gross premiums tax credits to insurance companies that invest in companies certified by the State of Tennessee as TNInvestcos....

  8. Sun Life Assurance Company of Canada is a member of the Sun Life Financial group of companies. 2005 Sun Life Assurance Company of Canada. All rights reserved.

    E-Print Network [OSTI]

    Mullins, Dyche

    JL 5/26/09 Sun Life Assurance Company of Canada is a member of the Sun Life Financial group of companies. © 2005 Sun Life Assurance Company of Canada. All rights reserved. Sun Life Financial and the globe symbol are registered trademarks of Sun Life Assurance Company of Canada. SLPC 5302 07/02 H I G H

  9. Record of Decision/Remedial Alternative Selection for the Motor Shops Seepage Basin (716-A)

    SciTech Connect (OSTI)

    Palmer, E.

    1999-02-03T23:59:59.000Z

    This decision document presents the selected remedial alternative for the Motor Shops Seepage Basin located at the Savannah River Site in Aiken, South Carolina

  10. Journal of Herpetology, Vol. 47, No. 2, 361368, 2013 Copyright 2013 Society for the Study of Amphibians and Reptiles

    E-Print Network [OSTI]

    Richter, Stephen C.

    University, Richmond, Kentucky 40475 USA 2 Savannah River Ecology Lab, University Georgia, Aiken, South National Wildlife Refuge, Madison, Indiana 47250 USA 6 Biology Department, Hanover College, Hanover

  11. EIS-0082-S2: Notice of Intent to Prepare a Supplemental Environmental...

    Office of Environmental Management (EM)

    Precipitation Process at the Savannah River Site, Aiken, South Carolina The Department of Energy (DOE) intends to prepare a supplemental environmental impact statement (SEIS) on...

  12. SPD SEIS References for Appendix C | National Nuclear Security...

    National Nuclear Security Administration (NNSA)

    Energy), 1982, Final Environmental Impact Statement, Defense Waste Processing Facility, Savannah River Plant, Aiken, S.C., DOEEIS-0082, Office of Defense Waste and Byproducts...

  13. June 2015 Most Viewed Documents for Fission And Nuclear Technologies...

    Office of Scientific and Technical Information (OSTI)

    Savannah River Co., Aiken, SC (United States)) (1992) 245 Cleaning Contaminated Water at Fukushima Rende, Dean; Nenoff, Tina (2013) 204 Flow-induced vibration of circular...

  14. Kinetic and Friction Head Loss Impacts on Horizontal Water Supply and Aquifer Storage and Recovery Wells

    E-Print Network [OSTI]

    Blumenthal, Benjamin

    2014-12-02T23:59:59.000Z

    -03) .............................................. 45 Castle Pines North Metro District, Colorado (2004) .................................... 49 Directional Environmental Wells ..................................................................... 53 Savannah River Site, Aiken, South Carolina (1988...

  15. EM National Laboratory’s Solvent to Save an Estimated $1.35 Billion

    Broader source: Energy.gov [DOE]

    AIKEN, S.C. – For the Savannah River National Laboratory (SRNL), successful deployment is the ultimate validation of science and technology’s value to the EM program.

  16. CX-006632: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    773-A, C-001 Roof Replacement Date: 08/02/2011Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office

  17. EIS-0023: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Long-Term Management of Defense High-Level Radioactive Wastes (Research and Development Program for Immobilization) Savannah River Plant, Aiken, South Carolina

  18. EIS-0062: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Waste Management Operations Double-Shell Tanks for Defense High-Level Radioactive Waste Storage Savannah River Plant, Aiken, South Carolina

  19. Hood River Passive House

    SciTech Connect (OSTI)

    Hales, D.

    2013-03-01T23:59:59.000Z

    The Hood River Passive Project was developed by Root Design Build of Hood River Oregon using the Passive House Planning Package (PHPP) to meet all of the requirements for certification under the European Passive House standards. The Passive House design approach has been gaining momentum among residential designers for custom homes and BEopt modeling indicates that these designs may actually exceed the goal of the U.S. Department of Energy's (DOE) Building America program to reduce home energy use by 30%-50% (compared to 2009 energy codes for new homes). This report documents the short term test results of the Shift House and compares the results of PHPP and BEopt modeling of the project.

  20. Private Company Uses EERE-Supported Chemistry Model to Substantially...

    Office of Environmental Management (EM)

    Private Company Uses EERE-Supported Chemistry Model to Substantially Improve Combustion Engine Simulation Software Private Company Uses EERE-Supported Chemistry Model to...

  1. Vermont Wind Measurement Company Still Strong | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Vermont Wind Measurement Company Still Strong Vermont Wind Measurement Company Still Strong April 9, 2010 - 3:16pm Addthis NRG's new building utilizes solar power, but their...

  2. Regulation of Gas, Electric, and Water Companies (Maryland)

    Broader source: Energy.gov [DOE]

    The Public Service Commission is responsible for regulating gas, electric, and water companies in the state. This legislation contains provisions for such companies, addressing planning and siting...

  3. National Interest Security Company NISC Formerly Technology Management...

    Open Energy Info (EERE)

    National Interest Security Company NISC Formerly Technology Management Services TMS Inc Jump to: navigation, search Name: National Interest Security Company (NISC) (Formerly...

  4. Sandia National Laboratories: UOP-a Honeywell Company

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    UOP-a Honeywell Company ECIS and UOP (a Honewell Company): CSTs Clean Radioactive Waste in Fukushima and Worldwide On February 14, 2013, in Energy, Materials Science, Nuclear...

  5. Dow Chemical Company: Assessment Leads to Steam System Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Dow Chemical Company: Assessment Leads to Steam System Energy Savings in a Petrochemical Plant Dow Chemical Company: Assessment Leads to Steam System Energy Savings in a...

  6. Sandia National Laboratories: Ocean Renewable Power Company TidGen®...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Company TidGen turbine High-Fidelity Hydrostructural Analysis of Ocean Renewable Power Company's (ORPC's) TidGen Turbine On March 19, 2014, in Computational Modeling &...

  7. Inspection of Westinghouse Savannah River Company Fees for Managing and Operating the Savannah River Site, IG-0377

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently Asked Questions for DOEtheInspection Report: INS-O-15-01 InspectionSummary

  8. Swift Creek Hydroelectric Project rehabilitation, Swift Creek Power Company, Inc

    SciTech Connect (OSTI)

    Not Available

    1992-10-01T23:59:59.000Z

    The purpose of this report is to re-evaluate and update the original environmental analysis of the Swift Crook Hydroelectric Project rehabilitation. That analysis and the decision to allow the proponent toproceed with the project as described in the EA alternatives 3, 4, and 5 was completed an May 8, 1981. Since that decision, no action has been taken and no special-use permit has ever been issued. The Bridger-Trton National Forest completed a Forest Plan in March of 1990 which sets current direction for all lands within the Forest and new and significant issues pertaining to the amount of water to be bypassed have been raised by the public in response to this proposed project. The original proponent, Lower Valley Power and Light, sold the project and existing facilities to Swift Crack Power Company Inc. in 1984. Swift Crock Power Company has submitted a proposal to rehabilitate the existing power generation facility in Swift Creek Canyon, which will involve some significant construction and alteration of the river corridor. Theyhave also submitted an application for relicense to the Federal Energy Regulatory Commission who has asked for the Forest Service to comment on the application and to submit recommended conditions for approval (4e requirements). The proposed rehabilitation of existing facilities includes replacement of the existing damaged penstock (pipe) with a new, larger one; dredging two existing reservoirs and removal, refurbishment, and reinstallation of the turbines and generators in the two powerhouses with relocation and reconstruction of the lower powerhouse that is located on privately owned land below the Forest boundary.

  9. THE FRESHWATER DECAPOD CRUSTACEANS (Pa/aemon/dae, Cambar/dae)

    E-Print Network [OSTI]

    Georgia, University of

    A Publication of the Savannah River Plant, National Environmental Research Park Program #12 Springfield , Ohio 45501 James H. Thorp Savannah River Ecology Laboratory Drawer E, Aiken, South Carolina 29801 and Gilbert E . Anderson Savannah River Ecology Laboratory Drawer E, Aiken , South Carolina 2980 1

  10. New Mexico Gas Company- Residential Efficiency Programs

    Broader source: Energy.gov [DOE]

    The New Mexico Gas Company provides incentives for energy saving measures and improvements to residential homes. Rebates are available for adding insulation and for homes which attain Energy Star...

  11. Deere and Company Energy Management Program

    E-Print Network [OSTI]

    Boyd, P. M.

    1980-01-01T23:59:59.000Z

    An overview of the Deere & Company energy management program is discussed. A review is made of seven key elements which have contributed to the success of the program. Installed projects and established programs are identified and discussed...

  12. Fall 2012 FUPWG Meeting Welcome: Southern Company

    Broader source: Energy.gov [DOE]

    Presentation—given at the Fall 2012 Federal Utility Partnership Working Group (FUPWG) meeting—covers the Southern Company's retail service territory, financials, customers and sales, power generation, U.S. military projects, and more.

  13. CompanieswithPNNLRoots All of these companies

    E-Print Network [OSTI]

    Devary Communications ­ 1995 Directed Technologies Drilling, Inc. ­ 1992 Ebasco, (Foster Wheeler Toro Prepaid, Inc., now Coinstar) ­ 1997 New Horizon Technologies, Inc. ­ 1995 Nortec (formerlyCompanieswithPNNLRoots All of these companies have received foundational technology and

  14. Deere and Company Energy Management Program 

    E-Print Network [OSTI]

    Boyd, P. M.

    1980-01-01T23:59:59.000Z

    An overview of the Deere & Company energy management program is discussed. A review is made of seven key elements which have contributed to the success of the program. Installed projects and established programs are identified and discussed...

  15. HILL Plateau Remediation Company are using American

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to remove contaminants and protect the Columbia River. Construction of a pump-and-treat system near the D Reactors on the Hanford Site began in July 2009. The 20 million...

  16. A virtual company concept for reservoir management

    SciTech Connect (OSTI)

    Martin, F.D. [Dave Martin and Associates, Inc. (United States); Kendall, R.P.; Whitney, E.M. [Los Alamos National Lab., NM (United States)

    1998-12-31T23:59:59.000Z

    This paper describes how reservoir management problems were pursued with a virtual company concept via the Internet and World Wide Web. The focus of the paper is on the implementation of virtual asset management teams that were assembled with small independent oil companies. The paper highlights the mechanics of how the virtual team transferred data and interpretations, evaluated geological models of complex reservoirs, and used results of simulation studies to analyze various reservoir management strategies.

  17. An analysis of the bank holding company

    E-Print Network [OSTI]

    Facka, David William

    1969-01-01T23:59:59.000Z

    company exercises more supervision over the investments of each affiliate bank than over any of the other affiliate bank's activities. This service improves the flow of information, thus increasing the productivity of investments . Many of the services...) the conven- ience, needs, and welfare of the communities and the area concerned; and (5) whether or not the effect of such acquisition or merger or consolidation would be to expand the size or extent of the bank holding company system involved beyond...

  18. Louisiana Nuclear Profile - River Bend

    U.S. Energy Information Administration (EIA) Indexed Site

    River Bend" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

  19. Florida Nuclear Profile - Crystal River

    U.S. Energy Information Administration (EIA) Indexed Site

    Crystal River1" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

  20. Rappahannock River Basin Commission (Virginia)

    Broader source: Energy.gov [DOE]

    The Rappahannock River Basin Commission is an independent local entity tasked with providing guidance for the stewardship and enhancement of the water quality and natural resources of the...

  1. Susquehanna River Basin Compact (Maryland)

    Broader source: Energy.gov [DOE]

    This legislation enables the state's entrance into the Susquehanna River Basin Compact, which provides for the conservation, development, and administration of the water resources of the...

  2. WABASH RIVER INTEGRATED METHANOL AND POWER PRODUCTION FROM CLEAN COAL TECHNOLOGIES (IMPPCCT)

    SciTech Connect (OSTI)

    Albert Tsang

    2003-03-14T23:59:59.000Z

    The Wabash River Integrated Methanol and Power Production from Clean Coal Technologies (IMPPCCT) project is evaluating integrated electrical power generation and methanol production through clean coal technologies. The project is conducted by a multi-industry team lead by Gasification Engineering Corporation (GEC), a company of Global Energy Inc., and supported by Air Products and Chemicals, Inc., Dow Chemical Company, Dow Corning Corporation, Methanex Corporation, and Siemens Westinghouse Power Corporation. Three project phases are planned for execution over several years, including: (1) Feasibility study and conceptual design for an integrated demonstration facility, and for fence-line commercial embodiment plants (CEP) operated at Dow Chemical or Dow Corning chemical plant locations (2) Research, development, and testing to define any technology gaps or critical design and integration issues (3) Engineering design and financing plan to install an integrated commercial demonstration facility at the existing Wabash River Energy Limited (WREL) plant in West Terre Haute, Indiana.

  3. South Carolina Scenic Rivers Act (South Carolina)

    Broader source: Energy.gov [DOE]

    The goal of the Scenic Rivers Act is to protect selected rivers or river segments of the State with outstanding scenic, recreational, geologic, botanical, fish, wildlife, historic, or cultural...

  4. Ohio River Greenway Development Commission (Indiana)

    Broader source: Energy.gov [DOE]

    The Ohio River Greenway Development Commission administers the Ohio River Greenway Project, which is a park along a 7-mile stretch of the Ohio River. The Commission developed a master plan for the...

  5. Fall Chinook Salmon Spawning Ground Surveys in the Snake River Basin Upriver of Lower Granite Dam, 2005 Annual Report.

    SciTech Connect (OSTI)

    Garcia, A.P.; Bradbury, S.; Arnsberg, B.D.; Rocklage, S.J.; Groves, P.A.

    2006-10-01T23:59:59.000Z

    Redd counts are routinely used to document the spawning distribution of fall Chinook salmon (Oncorhynchus tshawytscha) in the Snake River basin upriver of Lower Granite Dam. The first reported redd counts were from aerial searches conducted intermittently between 1959 and 1978 (Irving and Bjornn 1981, Witty 1988; Groves and Chandler 1996)(Appendix 1). In 1986, the Washington Department of Fish and Wildlife began an annual monitoring program that, in addition to the Snake River, included aerial searches of the Grande Ronde River the first year (Seidel and Bugert 1987), and the Imnaha River in subsequent years (Seidel et al. 1988; Bugert et al. 1989-1991; Mendel et al. 1992). The U. S. Fish and Wildlife Service and Idaho Power Company began contributing to this effort in 1991 by increasing the number of aerial searches conducted each year and adding underwater searches in areas of the Snake River that were too deep to be searched from the air (Connor et al. 1993; Garcia et al. 1994a, 1994b, 1996-2005; Groves 1993; Groves and Chandler 1996). The Nez Perce Tribe added aerial searches in the Clearwater River basin beginning in 1988 (Arnsberg et. al 1992), and the Salmon River beginning in 1992. Currently searches are conducted cooperatively by the Nez Perce Tribe, Idaho Power Company, and U.S. Fish and Wildlife Service. Our objective for this report was to consolidate the findings from annual redd searches into a single document, containing detailed information about the searches from the most recent spawning season, and summary information from previous years. The work conducted in 2005 was funded by the Bonneville Power Administration and Idaho Power Company.

  6. Fall Chinook Salmon Spawning Ground Surveys in the Snake River Basin Upriver of Lower Granite Dam, 2007 Annual Report.

    SciTech Connect (OSTI)

    Garcia, A.P.; Bradbury, S. [U.S. Fish and Wildlife Service; Arnsberg, B.D. [Nez Perce Tribe; Groves, P.A. [Idaho Power Company

    2008-11-25T23:59:59.000Z

    Redd counts are routinely used to document the spawning distribution of fall Chinook salmon (Oncorhynchus tshawytscha) in the Snake River basin upriver of Lower Granite Dam. The first reported redd counts were from aerial searches conducted intermittently between 1959 and 1978 (Irving and Bjornn 1981, Witty 1988; Groves and Chandler 1996)(Appendix 1). In 1986, the Washington Department of Fish and Wildlife began an annual monitoring program that, in addition to the Snake River, included aerial searches of the Grande Ronde River the first year (Seidel and Bugert 1987), and the Imnaha River in subsequent years (Seidel et al. 1988; Bugert et al. 1989-1991; Mendel et al. 1992). The U. S. Fish and Wildlife Service and Idaho Power Company began contributing to this effort in 1991 by increasing the number of aerial searches conducted each year and adding underwater searches in areas of the Snake River that were too deep to be searched from the air (Connor et al. 1993; Garcia et al. 1994a, 1994b, 1996-2007; Groves 1993; Groves and Chandler 1996). The Nez Perce Tribe added aerial searches in the Clearwater River basin beginning in 1988 (Arnsberg et. al 1992), and the Salmon River beginning in 1992. Currently searches are conducted cooperatively by the Nez Perce Tribe, Idaho Power Company, and U. S. Fish and Wildlife Service. Our objective for this report was to consolidate the findings from annual redd searches counted upstream of Lower Granite Dam into a single document, containing detailed information about the searches from the most recent spawning season, and summary information from previous years. The work conducted in 2007 was funded by the Bonneville Power Administration and Idaho Power Company.

  7. Savannah River National Laboratory (SRNL) Environmental Sciences...

    Office of Environmental Management (EM)

    Savannah River National Laboratory (SRNL) Environmental Sciences and Biotechnology Support of Waste Isolation Pilot Plant (WIPP) Savannah River National Laboratory (SRNL)...

  8. Independent Activity Report, Washington River Protection Solutions...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Washington River Protection Solutions, LLC - October 2011 October 2011 Industrial Hygiene Surveillance of the Washington River Protection Solutions, LLC Industrial Hygiene...

  9. Independent Oversight Activity Report, Savannah River Site -...

    Office of Environmental Management (EM)

    Activity Report, Savannah River Site - February 2014 February 2014 Operational Awareness Visit of the Savannah River Site HIAR-SRS-2014-02-25 This Independent Activity...

  10. Independent Oversight Inspection, Savannah River Site - January...

    Energy Savers [EERE]

    2010 More Documents & Publications Independent Oversight Review, Savannah River Site Tritium Facilities - December 2012 Enterprise Assessments Review, Savannah River Site 2014...

  11. Parallel Processing Letters fc World Scientific Publishing Company

    E-Print Network [OSTI]

    Calheiros, Rodrigo N.

    World Scientific Publishing Company http://ejournals.wspc.com.sg/ppl/ppl.shtml SCHEDULING AND MANAGEMENT

  12. Great River (1973)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC) Environmental AssessmentsGeoffrey(SC)Graphite Reactor 'In the- EnergyGreat-River

  13. FLOOD WARNING SYSTEM HAUGHTON RIVER

    E-Print Network [OSTI]

    Greenslade, Diana

    . The system provides early warning of heavy rainfall and river rises in the catchment and enables moreFLOOD WARNING SYSTEM for the HAUGHTON RIVER This brochure describes the flood warning system Flooding Flood Forecasting Local Information Haughton ALERT System Flood Warnings and Bulletins

  14. FLOOD WARNING SYSTEM BURDEKIN RIVER

    E-Print Network [OSTI]

    Greenslade, Diana

    . The system provides early warning of heavy rainfall and river rises in the catchment below the DamFLOOD WARNING SYSTEM for the BURDEKIN RIVER This brochure describes the flood warning system Local Information Burdekin ALERT System Flood Warnings and Bulletins Interpreting Flood Warnings

  15. Hood River Passive House

    SciTech Connect (OSTI)

    Hales, D.

    2014-01-01T23:59:59.000Z

    The Hood River Passive Project was developed by Root Design Build of Hood River Oregon using the Passive House Planning Package (PHPP) to meet all of the requirements for certification under the European Passive House standards. The Passive House design approach has been gaining momentum among residential designers for custom homes and BEopt modeling indicates that these designs may actually exceed the goal of the U.S. Department of Energy's (DOE) Building America program to reduce home energy use by 30%-50% (compared to 2009 energy codes for new homes). This report documents the short term test results of the Shift House and compares the results of PHPP and BEopt modeling of the project. The design includes high R-Value assemblies, extremely tight construction, high performance doors and windows, solar thermal DHW, heat recovery ventilation, moveable external shutters and a high performance ductless mini-split heat pump. Cost analysis indicates that many of the measures implemented in this project did not meet the BA standard for cost neutrality. The ductless mini-split heat pump, lighting and advanced air leakage control were the most cost effective measures. The future challenge will be to value engineer the performance levels indicated here in modeling using production based practices at a significantly lower cost.

  16. Achieving Accelerated Cleanup of Cesium Contaminated Stream at the Savannah River Site; Collaboration between Stakeholders, Regulators, and the Federal Government - 13182

    SciTech Connect (OSTI)

    Bergren, Chris; Flora, Mary; Socha, Ron; Burch, Joseph [Savannah River Nuclear Solutions, LLC, Bldg. 730-4B, Aiken, SC 29808 (United States)] [Savannah River Nuclear Solutions, LLC, Bldg. 730-4B, Aiken, SC 29808 (United States); Freeman, Candice; Hennessey, Brian [United States Department of Energy, Bldg. 730-B, Aiken, SC 29808 (United States)] [United States Department of Energy, Bldg. 730-B, Aiken, SC 29808 (United States)

    2013-07-01T23:59:59.000Z

    The Savannah River Site (SRS) is a 310-square-mile United States Department of Energy (US DOE) nuclear facility located along the Savannah River near Aiken, South Carolina that contains six primary stream/river systems. The Lower Three Runs Stream (LTR) is one of the primary streams within the site that is located in the southeast portion of the Savannah River Site and is a large black water stream system that originates in the northeast portion of SRS and follows a southerly direction before it enters the Savannah River. During reactor operations, secondary reactor cooling water, storm sewer discharges, and miscellaneous wastewater was discharged and contaminated a 36 kilometer stretch of Lower Three Runs Stream that narrows providing a limited buffer of US DOE property along the stream and flood plain. Based on data collected during 2009 and 2010 under Recover Act Funding, the stream was determined to be contaminated with cesium-137 at levels that exceeded acceptable risk based limits. As efficiencies were realized within the SRS Recovery Act Program, funding was made available to design, permit and execute remediation of the LTR. This accelerated Project allowed for the remediation of 36 kilometers of LTR in only nine months from inception to completion, contributing significantly to the Foot Print Reduction of SRS. The scope consisted of excavation and disposal of more than 2064 cubic meters of contaminated soil, and installing 11 kilometers of fence and 2,000 signs at 1000 locations. Confirmatory sampling and analysis, and radiological surveying were performed demonstrating that soil concentrations met the cleanup goals. The project completed with a very good safety record considering the harsh conditions including, excessive rain in the early stages of the project, high summer temperatures, swampy terrain, snakes, wild boar, insects and dense vegetation. The regulatory approval process was compressed by over 75% and required significant efforts from SRS's stakeholders including the regulators, U. S. Environmental Protection Agency (US EPA) and the South Carolina Department of Health and Environmental Control (SCDHEC), and the public including local property owners and the SRS Citizens Advisory Board. Stakeholder buy-in was critical in the up-front planning in order to achieve this challenging cleanup. (authors)

  17. Property:CompanyType | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual SiteofEvaluatingGroupPerfectenergyInformationProjectAffiliated CompaniesCompanyType Jump

  18. Oman Oil Company | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to: navigation, searchOfRoseConcernsCompany Oil and Gas CompanyOklahoma/WindOkpilakIIOmahaOman

  19. SAVANNAH RIVER SITE A PUIIUCATION OF THE SAVANNAII RIVER ECOI"OGY LAIIORATORY

    E-Print Network [OSTI]

    Georgia, University of

    OF THE SAVANNAH RIVER SITE A PUIIUCATION OF THE SAVANNAII RIVER ECOI"OGY LAIIORATORY NATIONAL of the Savannah River Site National Environmental Research Park Program Publication number: SRO-NERP-2S Printed OF THE SAVANNAH RIVER SITE BY CHARLES E. DAVIS AND LAURA L. JANECEK A PUBLICATION OF THE SAVANNAH RIVER SITE

  20. The Pecos River Ecosystem Project Progress Report

    E-Print Network [OSTI]

    Hart, C.

    planting saltcedar for stream bank erosion control along such rivers as the Pecos River in New Mexico. The plant has spread down the Pecos River into Texas and is now known to occur along the river south of Interstate 10. More recently the plant has become...

  1. Kern River CogenerationCompany I Box 80478, Bakers Neil E. Burgess, ExecutiveDirector

    E-Print Network [OSTI]

    turbines equipped with dry Low NOx (DLN)combustors, four (4)unfired heat recovery steam generators (HRSGs: This petition is being submitted to allow KRCC to add additional DLNl+ equipment in KRCC Units 2 and 4 and to replace the existing dry low NOx combustors in KRCC Units 1 and 3 with DLNl+ combustors. KRCC has applied

  2. Preliminary Notice of Violation, Savannah River Company - EA-97-11 |

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn April 23, 2014, an OHA AdministrativeofDepartment of-Department ofof| Department

  3. ‘Safety Begins with Me’ Works toward an Injury-Free Workplace at Savannah River Site- Employees embrace high-quality safety awareness campaign

    Broader source: Energy.gov [DOE]

    AIKEN, S.C. – Banners decorate overpasses, safety-related stories fill internal communications, posters adorn walls, and badges and stickers with the words “Safety Begins with Me” appear on badge lanyards, filing cabinets, building doors and vehicle dashboards.

  4. Hydrogen Technology Park DTE Energy -Company Overview

    E-Print Network [OSTI]

    Gas Production Detroit Edison Power Generation Energy Services* Energy Trading Biomass Energy Coal billion · 2.6 million customers · 11,000 MW of generation · 600 BCF natural gas delivery · 11,000 employees #12;3 Diversified Energy and Energy Technology Company * Energy Services: Coal Based Fuels

  5. Search Business News, Stocks, Funds, Companies

    E-Print Network [OSTI]

    Yaghi, Omar M.

    To capture the carbon dioxide generated by coal plants, chemical companies like Dow Chemical Co. and energy in Business » Search All NYTimes.com Energy & Environment WORLD U.S. N.Y. / REGION BUSINESS TECHNOLOGY SCIENCE's Revival May Combat Climate Change Build a Better Carbon Trap and ... And Now, Climate Bill's Supporters

  6. Grid Reliability- An Electric Utility Company's Perspective

    Broader source: Energy.gov [DOE]

    Presentation—given at the Federal Utility Partnership Working Group (FUPWG) Fall 2008 meeting—covers Southern Company's business continuity, North American Electric Reliability Corporation (NERC) cybersecurity, and homeland security as well as physical recovery after a major outage, and five questions to ask your local utility.

  7. AD CONTENT CHECK LIST: o Company logo

    E-Print Network [OSTI]

    Zakharov, Vladimir

    AD CONTENT CHECK LIST: o Company logo o Address o Contact Info: Phone, web site, and/or e-mail o that will perfectly reflect your image! Acceptable Formats For Logos/Graphics/Photos High-Res (300 dpi) PDF, EPS

  8. Portland General Electric Company Pilot Evaluation and

    E-Print Network [OSTI]

    . The purposes of this pilot were to measure the load impact of turning off water heaters during peak hours, test customer acceptance of remote control of their water heater, determine the company's capability to control) was installed in each participant's home. Water heaters were shut off remotely (curtailed), using the paging

  9. Aeroseal, LLC a JMD, Inc Company

    E-Print Network [OSTI]

    Aeroseal, LLC a JMD, Inc Company 6838 Ellicott Drive East Syracuse, NY 13057 www.aeroseal.com Seal the Savings! May 26, 2011 Brady Peeks Northwest test procedure using an Aeroseal SmartSeal system. The total leakage of the duct system to the outside

  10. Aquatic Supplement Hood River Subbasin

    E-Print Network [OSTI]

    of Oregon and Washington stream temperature data Figure 4 and 5. Herman Creek (Oxbow Hatchery): 7-Day Moving.7 (10 cfs) 50 powerhouse discharge river mile 4.51 (20 cfs) Upper Lenz or Odell cr no info Davis water

  11. Massachusetts Rivers Protection Act (Massachusetts)

    Broader source: Energy.gov [DOE]

    The law creates a 200-foot riverfront area that extends on both sides of rivers and streams. The riverfront area is 25 feet in the following municipalities: Boston, Brockton, Cambridge, Chelsea,...

  12. Case Studies in River Management

    E-Print Network [OSTI]

    Julien, Pierre Y.

    of the Middle Rio Grande --Discharge Analysis --Reservoir Level Analysis Site Description and Background --History of the Middle Rio Grande --Discharge Analysis --Reservoir Level Analysis Aggradation of Abandoned Channels Cheongmi Stream and Mangyeong River Cheongmi Stream South Korea In Collaboration

  13. Niobrara Scenic River Act (Nebraska)

    Broader source: Energy.gov [DOE]

    This act establishes the Niobrara Council, to assist in all aspects of the management of the Niobrara scenic river corridor and promulgate rules and regulations related to the preservation of the...

  14. Dayao County Yupao River BasDayao County Yupao River Basin Hydro...

    Open Energy Info (EERE)

    Dayao County Yupao River BasDayao County Yupao River Basin Hydro electricity Development Co Ltd in Jump to: navigation, search Name: Dayao County Yupao River BasDayao County Yupao...

  15. EA-1692: Red River Environmental Products, LLC Activated Carbon...

    Office of Environmental Management (EM)

    2: Red River Environmental Products, LLC Activated Carbon Manufacturing Facility, Red River Parish, LA EA-1692: Red River Environmental Products, LLC Activated Carbon Manufacturing...

  16. Operational improvements at Jewell Coal and Coke Company`s non-recovery ovens

    SciTech Connect (OSTI)

    Ellis, C.E.; Pruitt, C.W.

    1995-12-01T23:59:59.000Z

    Operational improvements at Jewell Coal and Coke Company over the past five years includes safety and environmental concerns, product quality, equipment availability, manpower utilization, and productivity. These improvements with Jewell`s unique process has allowed Jewell Coal and Coke Company to be a consistent, high quality coke producer. The paper briefly explains Jewell`s unique ovens, their operating mode, improved process control, their maintenance management program, and their increase in productivity.

  17. CONTRIBUTIONS OF INTENSIVELY MANAGED FORESTS TO THE SUSTAINABILITY OF WILDLIFE COMMUNITIES IN THE SOUTH

    E-Print Network [OSTI]

    Mitchell, Mike

    Sciences, 11 West Jones Street, Raleigh, NC 27601-1029 (JAG); Savannah River Ecology Lab, Drawer E, Aiken University, Box 8002, Raleigh, NC, 27695-8002 (RAL); Savannah River Ecology Lab, Drawer E, Aiken, SC, 29802 to sustaining wildlife communities in the South. National Council for Air and Stream Improvement, Inc., PO Box

  18. Atmos. Meas. Tech., 7, 647687, 2014 www.atmos-meas-tech.net/7/647/2014/

    E-Print Network [OSTI]

    Wisconsin at Madison, University of

    , USA 6Savannah River National Laboratory, Aiken, SC, USA 7Savannah River Nuclear Solutions, LLC, Aiken, USA 5Environmental Energy Technologies Division, Lawrence Berkeley National Laboratory, Berkeley, CA4 measurements from tall towers in the NOAA Earth System Research Laboratory's Global Greenhouse Gas

  19. Deep drilling data, Raft River geothermal area, Idaho-Raft River...

    Open Energy Info (EERE)

    Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Deep drilling data, Raft River geothermal area, Idaho-Raft River geothermal exploration well...

  20. Sediment transport and topographic evolution of a coupled river and river plume system

    E-Print Network [OSTI]

    Sediment transport and topographic evolution of a coupled river and river plume system inundation from storms, hurricanes, and tsunamis [Tornqvist et al., 2007; Blum and Roberts, 2009; Jerolmack

  1. Biomass Company Sets Up Shop in High School Lab | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Biomass Company Sets Up Shop in High School Lab Biomass Company Sets Up Shop in High School Lab March 30, 2010 - 2:45pm Addthis Stephen Graff Former Writer & editor for Energy...

  2. SEP Success Story: Green Launching Pad Taps Six More Companies...

    Office of Environmental Management (EM)

    Green Launching Pad Taps Six More Companies for Take-off SEP Success Story: Green Launching Pad Taps Six More Companies for Take-off April 29, 2011 - 9:58am Addthis Yesterday, U.S....

  3. Geothermal Business on the Rise for Kansas Company | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Business on the Rise for Kansas Company Geothermal Business on the Rise for Kansas Company April 16, 2010 - 4:43pm Addthis Paul Lester Communications Specialist, Office of Energy...

  4. Special Provisions Affecting Gas, Water, or Pipeline Companies (South Carolina)

    Broader source: Energy.gov [DOE]

    This legislation confers the rights and privileges of telegraph and telephone companies (S.C. Code 58-9) on pipeline and water companies, and contains several additional provisions pertaining to...

  5. Corporate Energy Management: A Survey of Large Manufacturing Companies

    E-Print Network [OSTI]

    Norland, D. L.; Lind, L.

    Corporate practices regarding energy management vary substantially from one company to another. Some companies pay close attention to energy use throughout the corporation while others pay scant attention. This paper first describes what we call...

  6. SunShot Incubator Awardee Helps Companies Offer Discount Solar...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SunShot Incubator Awardee Helps Companies Offer Discount Solar as Employee Perk SunShot Incubator Awardee Helps Companies Offer Discount Solar as Employee Perk March 31, 2015 -...

  7. Matching Gift Companies LEHIGH UNIVERSITY 1 3M Corporation

    E-Print Network [OSTI]

    Gilchrist, James F.

    Corporation Foundation The Eaton Charitable Fund Electroline Corporation Eli Lilly and Company FoundationMatching Gift Companies LEHIGH UNIVERSITY 1 3M Corporation Abbott Laboratories Accenture Foundation Technologies, Inc. Air Products Air Products Foundation Albemarle Corporation Alcoa Foundation Alliance Capital

  8. Intern experience at URS Company: an internship report

    E-Print Network [OSTI]

    Elkarmi, Fawwaz, 1950-

    2013-03-13T23:59:59.000Z

    This report describes the author's internship experience with URS Company - Dallas, Texas, from May 1980 to May 1981. The internship company is a consulting engineering firm engaged in providing professional services...

  9. Optimal capital structure of deep sea foreign freight transportation companies

    E-Print Network [OSTI]

    Georgiadis, Vasilis

    2014-01-01T23:59:59.000Z

    This thesis aims to understand the optimal leverage range for shipping companies (maritime foreign freight transportation companies - SIC 4412), through data analysis. This study confirms that in a traditional industry ...

  10. Current Size and Remaining Market Potential of the U.S. Energy Service Company Industry

    E-Print Network [OSTI]

    Stuart, Elizabeth

    2014-01-01T23:59:59.000Z

    disadvantage compared to solar companies that are verticallydisadvantage compared to solar companies that are verticallysolar leasing models with no upfront costs). These companies

  11. Public health assessment for Reynolds Metals Company, Troutdale, Multnomah County, Oregon, Region 10. Cerclis No. ORD009412677. Final report

    SciTech Connect (OSTI)

    NONE

    1997-01-14T23:59:59.000Z

    The Reynolds Metals Company in Troutdale, Oregon, is a primary aluminum plant. When operating, the plant produced wastes that were contaminated with aluminum, mercury, fluoride, polynuclear aromatic hydrocarbons (PAHs), polychlorinated biphenyls (PCBs), and cyanide. Studies are currently underway to determine the extent of environmental contamination and subsequent clean-up efforts which will be required. People may be exposed to contaminated soils and sediments in the area bordering the Columbia and Sandy rivers. Contamination at the site may have contributed to contamination of fish in the Columbia River, although it is difficult to determine what effect the site may have. Workers at the Reynolds site may also be exposed to contaminated soils and sediments, particularly those workers who are involved in outdoor activities.

  12. Evaluation and redesign of a company's distribution network

    E-Print Network [OSTI]

    Burgos Fuentes, Sergio Armando

    2004-11-15T23:59:59.000Z

    EVALUATION AND REDESIGN OF A COMPANY?S DISTRIBUTION NETWORK A Record of Study by SERGIO ARMANDO BURGOS FUENTES Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements... for the degree of DOCTOR OF ENGINEERING August 2004 Major Subject: Engineering College of Engineering EVALUATION AND REDESIGN OF A COMPANY?S DISTRIBUTION NETWORK A Record of Study by SERGIO ARMANDO BURGOS FUENTES Approved...

  13. Pacific Gas and Electric Company_14-36-NG_3422

    Broader source: Energy.gov (indexed) [DOE]

    ) PACIFIC GAS AND ELECTRIC COMPANY ) DOCKET NO. 14-36-NG ) ORDER GRANTING BLANKET AUTHORIZATION TO IMPORT NATURAL GAS FROM...

  14. Evaluation and redesign of a company's distribution network 

    E-Print Network [OSTI]

    Burgos Fuentes, Sergio Armando

    2004-11-15T23:59:59.000Z

    EVALUATION AND REDESIGN OF A COMPANY?S DISTRIBUTION NETWORK A Record of Study by SERGIO ARMANDO BURGOS FUENTES Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements... for the degree of DOCTOR OF ENGINEERING August 2004 Major Subject: Engineering College of Engineering EVALUATION AND REDESIGN OF A COMPANY?S DISTRIBUTION NETWORK A Record of Study by SERGIO ARMANDO BURGOS FUENTES Approved...

  15. Software Quality Modeling Experiences at an Oil Company Constanza Lampasona &

    E-Print Network [OSTI]

    Basili, Victor R.

    Software Quality Modeling Experiences at an Oil Company Constanza Lampasona & Jens Heidrich by Ecopetrol, a Colombian oil and gas company. The general approach taken is illustrated and excerpts from is to become one of the 30 most important companies in the oil and gas domain by 2020. IT plays an important

  16. Company Name: Oracle Web Site: www.oracle.com

    E-Print Network [OSTI]

    New Hampshire, University of

    , current product ownership, current and future technology plans and targeted areas of opportunity To viewCompany Name: Oracle Web Site: www.oracle.com Industry: Technology Brief Company Overview: Oracle company. With more than 370,000 customers including 100 of the Fortune 100 in more than 145 countries

  17. Dutch Wholesale Company Highway 57 North Elnora, IN 47529

    E-Print Network [OSTI]

    2011 Dutch Wholesale Company Highway 57 North · Elnora, IN 47529 TOLL FREE: (800) 472-9178 · FAX States only. J enclosed is a check payable to Dutch Wholesale Company J J please send payment with your! Thank You! Dutch Wholesale Company Highway 57 North Elnora, IN 47529 Phone: (800) 472-9178 Fax: (812

  18. Kharisma Jaya Gemilang (KJG), an Indonesian company part-

    E-Print Network [OSTI]

    companies based in Asia, Africa, and South America. We are also engaged in timber trade policy initiativesKharisma Jaya Gemilang (KJG), an Indonesian company part- nering with TTAP received the Tropical verification through a variety of site visits of companies engaged in the process. Rachel But- ler, Head

  19. A Start-up company to start your career

    E-Print Network [OSTI]

    A Start-up company to start your career Professional Development Seminar March 6, 2013 #12;What is a start-up company? · Small, just started · Typically 1-5 years old · Often no products, no sales · Developing something totally new · May, or may not be a market #12;What is a start-up company? · Funding

  20. Research Investments in Large Indian Software Companies Pankaj Jalote

    E-Print Network [OSTI]

    Jalote, Pankaj

    of the company can use to improve the business. Research is typically not a business or a profit center to bring out newer products in the market place. But why does a service company need investment in researchResearch Investments in Large Indian Software Companies Pankaj Jalote Professor, Department

  1. THE STRUCTURE OF PATENT AUTHORSHIP NETWORKS IN JAPANESE MANUFACTURING COMPANIES

    E-Print Network [OSTI]

    Thawonmas, Ruck

    THE STRUCTURE OF PATENT AUTHORSHIP NETWORKS IN JAPANESE MANUFACTURING COMPANIES Kohei Tsuda, Frank of these strategies is the creation of patents, which help eliminate or contain competition. Companies seek to learn the research strategies of their competitors. At the same time, all companies try to hide their own strategies

  2. Analysis of Strategies of Companies under Carbon Constraint: Relationship between Profit Structure of Companies and Carbon/Fuel Price Uncertainty

    E-Print Network [OSTI]

    Hashimoto, Susumu

    This paper examines the relationship between future carbon prices and the expected profit of companies by case studies with model companies. As the future carbon price will vary significantly in accordance with the political ...

  3. Company Name: The Timken Company Web Site: http://www.timken.com/en-us/careers/Pages/default.aspx

    E-Print Network [OSTI]

    New Hampshire, University of

    Company Name: The Timken Company Web Site: http, clean steel making, precision manufacturing, metrology, and engineered surfaces and coatings they typically recruit: Engineering Brief description of typical entry-level position: Sales Engineering, Field

  4. Meeting State Carbon Emission Requirements through Industrial Energy Efficiency: The Southern California Gas Company’s Industrial End User Program

    Broader source: Energy.gov [DOE]

    This case study describes the Southern California Gas Company’s Industrial End User program, which helps large industrial customers increase energy efficiency and reduce energy use and greenhouse gas emissions.

  5. Foreign Energy Company Competitiveness: Background information

    SciTech Connect (OSTI)

    Weimar, M.R.; Freund, K.A.; Roop, J.M.

    1994-10-01T23:59:59.000Z

    This report provides background information to the report Energy Company Competitiveness: Little to Do With Subsidies (DOE 1994). The main body of this publication consists of data uncovered during the course of research on this DOE report. This data pertains to major government energy policies in each country studied. This report also provides a summary of the DOE report. In October 1993, the Office of Energy Intelligence, US Department of Energy (formerly the Office of Foreign Intelligence), requested that Pacific Northwest Laboratory prepare a report addressing policies and actions used by foreign governments to enhance the competitiveness of their energy firms. Pacific Northwest Laboratory prepared the report Energy Company Competitiveness Little to Do With Subsidies (DOE 1994), which provided the analysis requested by DOE. An appendix was also prepared, which provided extensive background documentation to the analysis. Because of the length of the appendix, Pacific Northwest Laboratory decided to publish this information separately, as contained in this report.

  6. Status of Tampa Electric Company IGCC Project

    SciTech Connect (OSTI)

    Jenkins, S.D.

    1992-01-01T23:59:59.000Z

    Tampa Electric Company will utilize Integrated Gasification Combined Cycle technology for its new Polk Power Station Unit [number sign]1. The project is partially funded under the Department of Energy Clean Coal Technology Program Round III. This paper describes the technology to be used, process details, demonstration of a new hot gas clean-up system, and the schedule, leading to commercial operation in July 1996.

  7. Status of Tampa Electric Company IGCC Project

    SciTech Connect (OSTI)

    Jenkins, S.D.

    1992-10-01T23:59:59.000Z

    Tampa Electric Company will utilize Integrated Gasification Combined Cycle technology for its new Polk Power Station Unit {number_sign}1. The project is partially funded under the Department of Energy Clean Coal Technology Program Round III. This paper describes the technology to be used, process details, demonstration of a new hot gas clean-up system, and the schedule, leading to commercial operation in July 1996.

  8. Company Template (Fixed Support) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative FuelsNovember 13, 2014 BuildingEnergy EfficiencyPast ProjectsCommunityCompany Template

  9. Enterprise Assessments Review, Savannah River Site 2014 Site...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications Independent Oversight Inspection, Savannah River Site - January 2010 Independent Oversight Review, Savannah River Site Tritium Facilities - December...

  10. Elm Fork of the Trinity River Floodplain Management Study

    E-Print Network [OSTI]

    Tickle, Greg; Clary, Melinda

    2001-01-01T23:59:59.000Z

    ELM FORK OF THE TRINITY RIVER FLOODPLAIN MANAGEMENT STUDYof the Elm Fork of the Trinity River, Dallas County, Dallas,

  11. HYDROGEN TECHNOLOGY RESEARCH AT THE SAVANNAH RIVER NATIONAL LABORATORY, CENTER FOR HYDROGEN RESEARCH, AND THE HYDROGEN TECHNOLOGY RESEARCH LABORATORY

    SciTech Connect (OSTI)

    Danko, E

    2007-02-26T23:59:59.000Z

    The Savannah River National Laboratory (SRNL) is a U.S. Department of Energy research and development laboratory located at the Savannah River Site (SRS) near Aiken, South Carolina. SRNL has over 50 years of experience in developing and applying hydrogen technology, both through its national defense activities as well as through its recent activities with the DOE Hydrogen Programs. The hydrogen technical staff at SRNL comprises over 90 scientists, engineers and technologists, and it is believed to be the largest such staff in the U.S. SRNL has ongoing R&D initiatives in a variety of hydrogen storage areas, including metal hydrides, complex hydrides, chemical hydrides and carbon nanotubes. SRNL has over 25 years of experience in metal hydrides and solid-state hydrogen storage research, development and demonstration. As part of its defense mission at SRS, SRNL developed, designed, demonstrated and provides ongoing technical support for the largest hydrogen processing facility in the world based on the integrated use of metal hydrides for hydrogen storage, separation and compression. The SRNL has been active in teaming with academic and industrial partners to advance hydrogen technology. A primary focus of SRNL's R&D has been hydrogen storage using metal and complex hydrides. SRNL and its Hydrogen Technology Laboratory have been very successful in leveraging their defense infrastructure, capabilities and investments to help solve this country's energy problems. Many of SRNL's programs support dual-use applications. SRNL has participated in projects to convert public transit and utility vehicles for operation on hydrogen fuel. Two major projects include the H2Fuel Bus and an Industrial Fuel Cell Vehicle (IFCV) also known as the GATOR{trademark}. Both of these projects were funded by DOE and cost shared by industry. These are discussed further in Section 3.0, Demonstration Projects. In addition to metal hydrides technology, the SRNL Hydrogen group has done extensive R&D in other hydrogen technologies, including membrane filters for H2 separation, doped carbon nanotubes, storage vessel design and optimization, chemical hydrides, hydrogen compressors and hydrogen production using nuclear energy. Several of these are discussed further in Section 2, SRNL Hydrogen Research and Development.

  12. Lakes and Rivers Improvement Act (Ontario, Canada)

    Broader source: Energy.gov [DOE]

    The Lakes and Rivers Improvement Act proscribes the management, protection, preservation and use of the waters of the lakes and rivers of Ontario and the land under them. The Act also details...

  13. An Inside Look at River Corridor

    Broader source: Energy.gov [DOE]

    In the seventh chapter of The Handford Story, the Energy Department takes a look at the River Corridor -- a 50-mile stretch of the Columbia River that flows through the Hanford site in southeast...

  14. Belle Fourche River Compact (South Dakota)

    Broader source: Energy.gov [DOE]

    The Belle Fourche River Compact, agreed to by South Dakota and Wyoming, seeks to provide for the most efficient use of the waters of the Belle Fourche River Basin for multiple purposes, and to...

  15. Youghiogheny Wild and Scenic River (Maryland)

    Broader source: Energy.gov [DOE]

    Portions of the Youghiogheny River are protected under the Scenic and Wild Rivers Act, and development on or near these areas is restricted. COMAR section 08.15.02 addresses permitted uses and...

  16. River System Hydrology in Texas

    E-Print Network [OSTI]

    Wurbs, R.; Zhang, Y.

    2014-01-01T23:59:59.000Z

    ,700 86,700 Proctor Leon River USACE 1963 59,400 54,702 310,100 Belton Leon River USACE 1954 457,600 432,978 640,000 Stillhouse Hollow Lampasas River USACE 1968 235,700 224,279 390,660 Georgetown San Gabriel R USACE 1980 37,100 36,980 87,600 Granger... San Gabriel R USACE 1980 65,500 50,540 162,200 Somerville Yequa Creek USACE 1967 160,110 154,254 337,700 Hubbard Creek Hubbard Creek WCTMWD 1962 317,750 317,750 í Post NF Double Mt WRMWD proposed 57,420 í í Alan Henry SF Double Mt Lubbock 1993 115...

  17. Grays River Watershed Geomorphic Analysis

    SciTech Connect (OSTI)

    Geist, David R.

    2005-04-30T23:59:59.000Z

    This investigation, completed for the Pacific Northwest National Laboratory (PNNL), is part of the Grays River Watershed and Biological Assessment commissioned by Bonneville Power Administration under project number 2003-013-00 to assess impacts on salmon habitat in the upper Grays River watershed and present recommendations for habitat improvement. This report presents the findings of the geomorphic assessment and is intended to support the overall PNNL project by evaluating the following: 􀂃 The effects of historical and current land use practices on erosion and sedimentation within the channel network 􀂃 The ways in which these effects have influenced the sediment budget of the upper watershed 􀂃 The resulting responses in the main stem Grays River upstream of State Highway 4 􀂃 The past and future implications for salmon habi

  18. South Platte River Compact and U.S. Supreme Court Decree for North Platte River

    E-Print Network [OSTI]

    Nebraska-Lincoln, University of

    1 South Platte River Compact and U.S. Supreme Court Decree for North Platte River J. Michael Jess Platte, and Arkansas rivers, for example, have been resolved through litigation brought before the U and Kansas are examples. In the Platte River watershed the State of Nebraska has experience allocating water

  19. Prepared in cooperation with the Platte River Recovery Implementation Program River Channel Topographic Surveys Collected Prior

    E-Print Network [OSTI]

    Prepared in cooperation with the Platte River Recovery Implementation Program River Channel Topographic Surveys Collected Prior to and Following Elevated Flows in the Central Platte River, Spring 2008 Flows in the Central Platte River, Nebraska, Spring 2008 By Paul J. Kinzel Prepared in cooperation

  20. Effect of spill on adult salmon passage delay at Columbia River and Snake River dams

    E-Print Network [OSTI]

    Washington at Seattle, University of

    Effect of spill on adult salmon passage delay at Columbia River and Snake River dams W. Nicholas dams in the Columbia/Snake River hydrosystem may delay the upstream passage of the adults. To evaluate-to-day variations of spill and upstream fish passage at the eight dams of the Columbia/Snake river hydrosystem

  1. Historical Ecology of the lower santa clara river, Ventura river, and oxnard Plain

    E-Print Network [OSTI]

    Historical Ecology of the lower santa clara river, Ventura river, and oxnard Plain: an analysis. Historical ecology of the lower Santa Clara River,Ventura River, and Oxnard Plain: an analysis of terrestrial layers are available on SFEI's website, at www.sfei.org/projects/VenturaHE. Permissions rights for images

  2. Bayer Material Science (TRL 1 2 3 System)- River Devices to Recover Energy with Advanced Materials(River DREAM)

    Broader source: Energy.gov [DOE]

    Bayer Material Science (TRL 1 2 3 System) - River Devices to Recover Energy with Advanced Materials(River DREAM)

  3. The river model of black holes

    E-Print Network [OSTI]

    Andrew J. S. Hamilton; Jason P. Lisle

    2006-08-31T23:59:59.000Z

    This paper presents an under-appreciated way to conceptualize stationary black holes, which we call the river model. The river model is mathematically sound, yet simple enough that the basic picture can be understood by non-experts. %that can by understood by non-experts. In the river model, space itself flows like a river through a flat background, while objects move through the river according to the rules of special relativity. In a spherical black hole, the river of space falls into the black hole at the Newtonian escape velocity, hitting the speed of light at the horizon. Inside the horizon, the river flows inward faster than light, carrying everything with it. We show that the river model works also for rotating (Kerr-Newman) black holes, though with a surprising twist. As in the spherical case, the river of space can be regarded as moving through a flat background. However, the river does not spiral inward, as one might have anticipated, but rather falls inward with no azimuthal swirl at all. Instead, the river has at each point not only a velocity but also a rotation, or twist. That is, the river has a Lorentz structure, characterized by six numbers (velocity and rotation), not just three (velocity). As an object moves through the river, it changes its velocity and rotation in response to tidal changes in the velocity and twist of the river along its path. An explicit expression is given for the river field, a six-component bivector field that encodes the velocity and twist of the river at each point, and that encapsulates all the properties of a stationary rotating black hole.

  4. Columbia River Component Data Evaluation Summary Report

    SciTech Connect (OSTI)

    C.S. Cearlock

    2006-08-02T23:59:59.000Z

    The purpose of the Columbia River Component Data Compilation and Evaluation task was to compile, review, and evaluate existing information for constituents that may have been released to the Columbia River due to Hanford Site operations. Through this effort an extensive compilation of information pertaining to Hanford Site-related contaminants released to the Columbia River has been completed for almost 965 km of the river.

  5. Decommissioning an Active Historical Reactor Facility at the Savannah River Site - 13453

    SciTech Connect (OSTI)

    Bergren, Christopher L.; Long, J. Tony; Blankenship, John K. [Savannah River Nuclear Solutions, LLC, Bldg. 730-4B, Aiken, SC 29808 (United States)] [Savannah River Nuclear Solutions, LLC, Bldg. 730-4B, Aiken, SC 29808 (United States); Adams, Karen M. [United States Department of Energy, Bldg. 730-B, Aiken, SC 29808 (United States)] [United States Department of Energy, Bldg. 730-B, Aiken, SC 29808 (United States)

    2013-07-01T23:59:59.000Z

    The Savannah River Site (SRS) is an 802 square-kilometer United States Department of Energy (US DOE) nuclear facility located along the Savannah River near Aiken, South Carolina, where Management and Operations are performed by Savannah River Nuclear Solutions (SRNS). In 2004, DOE recognized SRS as structure within the Cold War Historic District of national, state and local significance composed of the first generation of facilities constructed and operated from 1950 through 1989 to produce plutonium and tritium for our nation's defense. DOE agreed to manage the SRS 105-C Reactor Facility as a potentially historic property due to its significance in supporting the U.S. Cold War Mission and for potential for future interpretation. This reactor has five primary areas within it, including a Disassembly Basin (DB) that received irradiated materials from the reactor, cooled them and prepared the components for loading and transport to a Separation Canyon for processing. The 6,317 square meter area was divided into numerous work/storage areas. The walls between the individual basin compartments have narrow vertical openings called 'slots' that permit the transfer of material from one section to another. Data indicated there was over 830 curies of radioactivity associated with the basin sediments and approximately 9.1 M liters of contaminated water, not including a large quantity of activated reactor equipment, scrap metal, and debris on the basin floor. The need for an action was identified in 2010 to reduce risks to personnel in the facility and to eliminate the possible release of contaminants into the environment. The release of DB water could potentially migrate to the aquifer and contaminate groundwater. DOE, its regulators [U. S. Environmental Protection Agency (USEPA)-Region 4 and the South Carolina Department of Health and Environmental Control (SCDHEC)] and the SC Historical Preservation Office (SHPO) agreed/concurred to perform a non-time critical removal action for the In Situ Decommissioning (ISD) of the 105-C Disassembly Basin. ISD consisted of stabilization/isolation of remaining contaminated water, sediment, activated reactor equipment, and scrap metal by filling the DB with underwater non-structural grout to the appropriate (-4.877 meter) grade-level, thence with dry area non-structural grout to the final -10 centimeter level. The roof over the DB was preserved due to its potential historical significance and to prevent the infiltration of precipitation. Forced evaporation was the form of treatment implemented to remove the approximately 9.1 M liters of contaminated basin water. Using specially formulated grouts, irradiated materials and sediment were treated by solidification/isolation thus reducing their mobility, reducing radiation exposure and creating an engineered barrier thereby preventing access to the contaminants. Grouting provided a low permeability barrier to minimize any potential transport of contaminants to the aquifer. Efforts were made to preserve the historical significance of the Reactor in accordance with the National Historic Preservation Act. ISD provides a cost effective means to isolate and contain residual radioactivity from past nuclear operations allowing natural radioactive decay to reduce hazards to manageable levels. This method limits release of radiological contamination to the environment, minimizes radiation exposure to workers, prevents human/animal access to the hazardous substances, and allows for ongoing monitoring of the decommissioned facility. Field construction was initiated in August 2011; evaporator operations commenced January 2012 and ended July 2012 with over 9 M liters of water treated/removed. Over 8,525 cubic meters of grout were placed, completing in August 2012. The project completed with an excellent safety record, on schedule and under budget. (authors)

  6. The Columbia River Estuary the Columbia River Basin

    E-Print Network [OSTI]

    River estuary was a high-energy environment dominated by physical forces, with extensive sand Riddell November 28, 2000 ISAB 2000-5 #12;ISAB 2000-5 Estuary Report i EXECUTIVE SUMMARY The Northwest to an informed response to the Council. Consequently, this report has been prepared as a preliminary reply

  7. FLOOD WARNING SYSTEM LOGAN & ALBERT RIVERS

    E-Print Network [OSTI]

    Greenslade, Diana

    . The system provides early warning of heavy rainfalls and river rises throughout the catchment and enablesFLOOD WARNING SYSTEM for the LOGAN & ALBERT RIVERS This brochure describes the flood warning system of Meteorology operates a flood warning system for the Logan and Albert River catchments based on a rainfall

  8. Oil and Gas Company Oil and Gas Company Address Place Zip Website

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to: navigation, searchOfRoseConcernsCompany Oil and Gas Company Address Place Zip Website Abu

  9. DOI: 10.1007/s00340-008-3056-9 Appl. Phys. B 92, 103109 (2008)

    E-Print Network [OSTI]

    2008-01-01T23:59:59.000Z

    , TX 77005, USA 2 Hydrogen Technology Research Laboratory, Savannah River National Laboratory, Aiken processes used at the Savannah River National Laboratory site, which was the main motivation to carry out

  10. A. J. Garrett, C. Salvaggio, and M. V. Casterline, "Thermodynamics of partially frozen cooling lakes," in Proceedings of SPIE, SPIE Defense and Security, Thermosense XXXII, Utilities and Fluid Dynamics, 7661,

    E-Print Network [OSTI]

    Salvaggio, Carl

    Salvaggiob a Savannah River National Laboratory, Highway 1, Aiken SC b Rochester Institute of Technology and atmospheric variables. The Savannah River National Laboratory (SRNL) used the data collected by RIT and a 3-D

  11. CX-004452: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Shipping Savannah River Site Heavy Water to Atomic Energy of Canada LimitedCX(s) Applied: A7, B1.30Date: 10/07/2010Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office

  12. Pennsylvania company prepares year-end review

    SciTech Connect (OSTI)

    Not Available

    1990-04-12T23:59:59.000Z

    Equitable Resources, Inc., in Pittsburgh, Pennsylvania, reports that consolidated income for calendar year 1989 was $50.9 million, or $2.43 per share, up from 1988's $47.1 million, or $2.27 per share. The difference was primarily due to a general increase in retail rates which became effective in January 1989 for distribution customers in the state. A December 1989 settlement of a pipeline subsidiary's rate increase also added to the increase. The rate increase had been in effect since 1986, but the full effect had been reserved pending the outcome of regulatory proceedings, the company stated.

  13. Maan Development Company | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer Plant Jump to:LandownersLuther, Oklahoma:EnergyECO AugerMaan Development Company Jump to:

  14. First Hydro Company | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual SiteofEvaluating A PotentialJumpGermanFife Energy Park at MethilGlobalFirstFirst Hydro Company

  15. Western Ethanol Company LLC | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown ofNationwideWTED JumpHills, NewWestbrook, Minnesota:Western Ethanol Company LLC

  16. Category:MHK Companies | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand JumpConceptual Model, click here. Category:Conceptual ModelLists for Companies" TheLists

  17. Shanghai TL Chemical Company | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro Industries Pvt Ltd JumpInformationScottsOklahoma:SevinShamilTL Chemical Company Jump to:

  18. Shenzhen Chuangyin Industrial Company | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro Industries Pvt LtdShawangunk, New York: Energy ResourcesShelton,Chuangyin Industrial Company

  19. Evans Capacitor Company | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand JumpConceptual Model,DOEHazelPennsylvania: Energy Resources(RECP) inEuricoOpenCompany Jump to:

  20. Green Hydrogen Company | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Siteof Energy 2,AUDIT REPORTEnergyFarms A SUKHydrogen Company Jump to: navigation, search

  1. Hydroenergy Company Ltd | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Siteof Energy 2,AUDIT REPORTEnergyFarms AHefeiHydroenergy Company Ltd Jump to: navigation,

  2. Xinjiang Wind Energy Company | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Siteof Energy 2,AUDITCaliforniaWeifang SwisselectronicXian Jieli ElectricHuitongCompany

  3. Wellsboro Electric Company | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-fTri GlobalJump to: navigation,Goff, 2002)Wellington Middle SchoolCompany

  4. Winslow Management Company LLC | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-fTriWildcat 1 Wind Project Jump to:WilsonIIa extension679°,Manitoba:Company

  5. Property:Affiliated Companies | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual SiteofEvaluatingGroupPerfectenergyInformationProjectAffiliated Companies Jump to:

  6. Property:CompanyOwnership | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual SiteofEvaluatingGroupPerfectenergyInformationProjectAffiliated Companies

  7. OpenEI Community - Utility Companies

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to: navigation, searchOfRoseConcernsCompany Oil and GasOff thedriving

  8. Ovonic Battery Company Inc | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to: navigation, searchOfRoseConcernsCompany OilInformationPre-TaxShelf Lands

  9. Phasor Energy Company Inc | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to: navigation, searchOfRoseConcernsCompanyPCNInformation USPerseus| Open EnergyU.S. DOEII

  10. Phoenix Canada Oil Company | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to: navigation, searchOfRoseConcernsCompanyPCNInformationLumileds Lighting Co Jump to:Phoenix

  11. Corsicana Chemical Company | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Siteof EnergyInnovationinConcentratingEnergyCoosa ValleyCorsicana Chemical Company Jump

  12. DMS Company Ltd | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Siteof EnergyInnovationinConcentratingEnergyCoosaPageEnergyDLC+VIT4IP CountryDMS Company

  13. Woodward Governor Company | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTownDells, Wisconsin: Energy ResourcesWoods County,NewWoodward Governor Company Jump

  14. Center Ethanol Company LLC | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Siteof EnergyInnovation inOpenadd: China Datang CorporationCenter Ethanol Company LLC Jump

  15. Narayanpur Power Company Ltd | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual SiteofEvaluatingGroup |JilinLu anMicrogreenMoonNASA/AmesNSNanotectureNarayanpur Power Company

  16. Ocean Energy Company LLC | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer PlantMunhall,Missouri: EnergyExcellence SeedNunn,andOasys WaterCity, New Jersey:OceanCompany

  17. BP Energy Company (Washington) | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty EditCalifornia: EnergyAvignon, France: Energy ResourcesBurleyBLMUSFWSBP Energy Company

  18. Diablo Research Company | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand JumpConceptual Model,DOE Facility DatabaseMichigan:Dewey-Humboldt, Arizona:Research Company Place:

  19. Tecumseh Products Company | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro Industries PvtStratosolar Jump to:HoldingsTechint Spa JumpTVC Jump to:TecogenProducts Company

  20. The Social Carbon Company | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro Industries PvtStratosolarTharaldson Ethanol LLC Jump to:UncertaintySocial Carbon Company Jump

  1. JM E3 Company | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual SiteofEvaluatingGroup | OpenHunanInformation sourceInvensysIsland GasItronJM E3 Company

  2. The Timken Company | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty Edit with formSoutheasternInformationPolicyREDD+ Book JumpTimken Company Jump to:

  3. Ameren Illinois Company | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-fTriWildcat Place:Alvan Blanch GreenAmeren Illinois Company Jump to:

  4. Chevron Hydrogen Company LLC | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty EditCalifornia:PowerCER.png El CER es unaChelmsford,VolcanicChevron Hydrogen Company

  5. Community Management Company | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty EditCalifornia:PowerCER.png ElColumbia, NorthCommunity Management Company Jump to:

  6. Nevis Engine Company | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer PlantMunhall, Pennsylvania: EnergyEnergyPPCR)Nevis Engine Company Jump to: navigation,

  7. Utility Companies | OpenEI Community

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty Edit withTianlin BaxinUmwelt Management AGUser page EditUsinasource HistoryCompanies

  8. United Oil Company | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown of Ladoga, IndianaTurtleCooperative Place: Beaver Dam,PopulationOil Company

  9. AgriFuel Company | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Siteof Energy 2,AUDITCaliforniaWeifangwikiAgoura Hills, California:AgriFuel Company Jump

  10. Peninsula Light Company | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual SiteofEvaluatingGroup |JilinLuOpenNorthOlympiaAnalysis)Pearl River ValleyPeninsula

  11. Peninsula Power Company Ltd | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual SiteofEvaluatingGroup |JilinLuOpenNorthOlympiaAnalysis)Pearl River ValleyPeninsulaPower

  12. Form:Company | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are8COaBulkTransmissionSitingProcess.pdf Jump to:ar-80m.pdfFillmoreGabbs ValleyCity,Forked River, NewDENERGY'CBECSbelow

  13. Certification process of safety analysis and risk management computer codes at the Savannah River Site

    SciTech Connect (OSTI)

    Ades, M.J. [Westinghouse Savannah River Co., Aiken, SC (United States); Toffer, H.; Lewis, C.J.; Crowe, R.D. [Westinghouse Hanford Co., Richland, WA (United States)

    1992-05-01T23:59:59.000Z

    The commitment by Westinghouse Savannah River Company (WSRC) to bring safety analysis and risk management codes into compliance with national and sitewide quality assurance requirements necessitated a systematic, structured approach. As a part of this effort, WSRC, in cooperation with the Westinghouse Hanford Company, has developed and implemented a certification process for the development and control of computer software. Safety analysis and risk management computer codes pertinent to reactor analyses were selected for inclusion in the certification process. As a first step, documented plans were developed for implementing verification and validation of the codes, and establishing configuration control. User qualification guidelines were determined. The plans were followed with an extensive assessment of the codes with respect to certification status. Detailed schedules and work plans were thus determined for completing certification of the codes considered. Although the software certification process discussed is specific to the application described, it is sufficiently general to provide useful insights and guidance for certification of other software.

  14. Certification process of safety analysis and risk management computer codes at the Savannah River Site

    SciTech Connect (OSTI)

    Ades, M.J. (Westinghouse Savannah River Co., Aiken, SC (United States)); Toffer, H.; Lewis, C.J.; Crowe, R.D. (Westinghouse Hanford Co., Richland, WA (United States))

    1992-01-01T23:59:59.000Z

    The commitment by Westinghouse Savannah River Company (WSRC) to bring safety analysis and risk management codes into compliance with national and sitewide quality assurance requirements necessitated a systematic, structured approach. As a part of this effort, WSRC, in cooperation with the Westinghouse Hanford Company, has developed and implemented a certification process for the development and control of computer software. Safety analysis and risk management computer codes pertinent to reactor analyses were selected for inclusion in the certification process. As a first step, documented plans were developed for implementing verification and validation of the codes, and establishing configuration control. User qualification guidelines were determined. The plans were followed with an extensive assessment of the codes with respect to certification status. Detailed schedules and work plans were thus determined for completing certification of the codes considered. Although the software certification process discussed is specific to the application described, it is sufficiently general to provide useful insights and guidance for certification of other software.

  15. Group Retirement Services are provided by Sun Life Assurance Company of Canada, a member of the Sun Life Financial group of Sun Life Assurance Company of Canada, 2011.

    E-Print Network [OSTI]

    Northern British Columbia, University of

    Group Retirement Services are provided by Sun Life Assurance Company of Canada, a member of the Sun Life Financial group of companies. © Sun Life Assurance Company of Canada, 2011. McLean Budden name

  16. Crossing the River: Attitudes of Invasion in the Revolutionary Ohio Country

    E-Print Network [OSTI]

    Zeltner, Oliver

    2004-03-01T23:59:59.000Z

    the Ohio and Miami land companies received Congressional land grants to survey and sell tracts north and west of the river, the United States government, as well as many individual founders, were betting on this result.31 When Lord Dunmore's War broke..., without much fatigue to himself, could here supply daily one hundred men with meat."40 While stationed at Fort Jefferson (present-day Greenville), a soldier recorded that, "Dear & bear are so plenty here it is common for them to am through our camp [and...

  17. QER- Comment of Pacific Gas and Electric Company

    Broader source: Energy.gov [DOE]

    PG&E is committed to protecting our customers' privacy. To learn more, please visit http://www.pge.com/about/company/privacy/customer/

  18. Asset Score Webinar Slides: Energy Efficiency Services Companies...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Score Webinar Slides: Energy Efficiency Services Companies The Asset Score is a free, web-based software tool developed by DOE and the Pacific Northwest National Laboratory...

  19. Thirteen Major Companies Join Energy Department's Workplace Charging...

    Energy Savers [EERE]

    electric vehicles is expanding dramatically, giving drivers more options to save money on gasoline while reducing carbon pollution," said Secretary Chu. "These 13 companies are...

  20. Campbell Soup Company: Harmonizing Processes and Empowering Workers

    E-Print Network [OSTI]

    Ross, Jeanne W.

    2008-06-01T23:59:59.000Z

    In 2007 Campbell Soup Company was implementing Project Harmony: a multi-year effort to implement SAP and create more standardized and integrated business processes across

  1. Model Energy Service Company Pre-Qualification Contract

    Broader source: Energy.gov [DOE]

    This page contains information and documents for creating a contract between an Energy Service Company and a state energy office (or other entity managing a performance contracting program).

  2. US Energy Service Company Industry: History and Business Models

    Broader source: Energy.gov (indexed) [DOE]

    Energy Service Company Industry: History and Business Models Don Gilligan President, NAESCO May 6, 2011 Overview of Presentation * US ESCO industry evolution: Five phases *...

  3. Dutch Company Powers Streetlights With Living Plants; Will Your...

    Open Energy Info (EERE)

    Dutch Company Powers Streetlights With Living Plants; Will Your Cell Phone Be Next? Home > Groups > OpenEI Community Central Dc's picture Submitted by Dc(266) Contributor 16...

  4. Gas Companies Operating Within the State of Connecticut (Connecticut)

    Broader source: Energy.gov [DOE]

    These regulations apply a broad definition of “gas company”, which includes any person or entity involved in the manufacture or transportation of gas within Connecticut. The regulations set...

  5. Geothermal: Sponsored by OSTI -- ESMERALDA ENERGY COMPANY FINAL...

    Office of Scientific and Technical Information (OSTI)

    ESMERALDA ENERGY COMPANY FINAL SCIENTIFIC TECHNICAL REPORT, January 2008, EMIGRANT SLIMHOLE DRILLING PROJECT, DOE GRED III (DE-FC36-04GO14339) Geothermal Technologies Legacy...

  6. AEP Public Service Company of Oklahoma- Residential Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    The Public Service Company of Oklahoma (PSO), an electric utility, encourages residential energy efficiency under a variety of incentive programs. General rebates for HVAC equipment, appliances and...

  7. Sandia National Laboratories: Public Service Company of New Mexico

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Public Service Company of New Mexico Electric Car Challenge Sparks Students' STEM Interest On January 9, 2015, in Energy, Energy Storage, News, News & Events, Partnership,...

  8. New Energy Dept., Berkeley Lab Report on Energy Service Company...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Lawrence Berkeley National Laboratory today released a new report on the market size, trends and growth projections for America's energy service company (ESCO)...

  9. Laclede Gas Company- Residential High Efficiency Heating Rebate Program

    Broader source: Energy.gov [DOE]

    Laclede Gas Company offers various rebates to residential customers for investing in energy efficient equipment and appliances. Residential customers can qualify for rebates on boilers, furnaces,...

  10. Peninsula Light Company- Commercial Efficient Lighting Rebate Program

    Broader source: Energy.gov [DOE]

    Peninsula Light Company (PLC) offers a rebate program for commercial customers who wish to upgrade to energy efficient lighting. Participating customers must be served by PLC commercial service....

  11. Peninsula Light Company- Residential Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    Peninsula Light Company offers a rebate program for residential customers who want to install energy efficient products in homes. Rebates are provided for window replacements, water heaters, heat...

  12. Joint Maintenance Status Report of Potomac Electric Power Company...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    amd PJM Interconnection, LLC Docket No. EO-05-01: Potomac Electric Power Company ("Pepco") and PJM Interconnection, L.L.C. ("PJM") hereby jointly submit this Maintenance...

  13. EECBG Success Story: Seven Cities and a Utility Company Team...

    Broader source: Energy.gov (indexed) [DOE]

    management software company OPOWER to help nearly 100,000 residents reduce their home energy consumption. The program, which was made possible in part by Energy Efficiency and...

  14. Savannah River Plant/Savannah River Laboratory radiation exposure report

    SciTech Connect (OSTI)

    Rogers, C.D.; Hyman, S.D.; Keisler, L.L. (Du Pont de Nemours (E.I.) and Co., Aiken, SC (USA). Savannah River Plant); Reeder, D.F.; Jolly, L.; Spoerner, M.T.; Schramm, G.R. (Du Pont de Nemours (E.I.) and Co., Aiken, SC (USA). Savannah River Lab.)

    1989-01-01T23:59:59.000Z

    The protection of worker health and safety is of paramount concern at the Savannah River Site. Since the site is one of the largest nuclear sites in the nation, radiation safety is a key element in the protection program. This report is a compendium of the results in 1988 of the programs at the Savannah River Plant and the Savannah River Laboratory to protect the radiological health of employees. By any measure, the radiation protection performance at this site in 1988 was the best since the beginning of operations. This accomplishment was made possible by the commitment and support at all levels of the organizations to reduce radiation exposures to ALARA (As Low As Reasonably Achievable). The report provides detailed information about the radiation doses received by departments and work groups within these organizations. It also includes exposure data for recent years to allow Plant and Laboratory units to track the effectiveness of their ALARA efforts. Many of the successful practices and methods that reduced radiation exposure are described. A new goal for personnel contamination cases has been established for 1989. Only through continual and innovative efforts to minimize exposures can the goals be met. The radiation protection goals for 1989 and previous years are included in the report. 27 figs., 58 tabs.

  15. The River Runs Dry: Examining Water Shortages in the Yellow River Basin

    E-Print Network [OSTI]

    Zusman, Eric

    2000-01-01T23:59:59.000Z

    Runs Dry: Examining Water Shortages in the Yellow Riverof the severity of water shortages in the river’s basin. Ina median level of runoff water shortages in the basin would

  16. The Davey Tree Expert Company Davey Foundation Arbor Grant Program

    E-Print Network [OSTI]

    of intent explaining future plans and financial need must be attached. Grades do not have to be fromThe Davey Tree Expert Company Davey Foundation Arbor Grant Program Purpose To provide financial Administrator, Education and Training Services The Davey Tree Expert Company 1500 North Mantua Street Kent, Ohio

  17. Faculty of MANAGEMENT Alberta Oil & Gas Company1

    E-Print Network [OSTI]

    Nakayama, Marvin K.

    Faculty of MANAGEMENT Alberta Oil & Gas Company1 Daphne Jackson, operations manager for Alberta Oil & Gas Company (AOGC) hangs up the phone in her home. Her boss, Will Russell, has phoned from Calgary's interest in the Waptaman oil field. Ordinarily, Will would lead such negotiations himself, but he has been

  18. The Boeing Company Project Fuel Tank Design Project Recap

    E-Print Network [OSTI]

    Demirel, Melik C.

    which consist of a 15o double angle displacement, 10 to 12 oscillations per minute oscillation frequencyThe Boeing Company Project Fuel Tank Design Project Recap The Boeing Company came to the Pennsylvania State University with a project for the mitigation of fuel slosh by utilizing different baffle

  19. Internet Security Systems, an IBM Company Threat Insight Monthly

    E-Print Network [OSTI]

    Internet Security Systems, an IBM Company X-Force ® Threat Insight Monthly www . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 Contents www.iss.netwww.iss.net Internet Security Systems, an IBM Company X-Force Threat Insight Monthly April 2007 #12;X-Force® Threat Insight Monthly > April 2007 www.iss.netwww.iss.net About

  20. The Cost of Power Disturbances to Industrial & Digital Economy Companies

    E-Print Network [OSTI]

    Schrijver, Karel

    's Consortium for Electric Infrastructure for a Digital Society (CEIDS) By 1001 Fourier Drive, Suite 200 MadisonThe Cost of Power Disturbances to Industrial & Digital Economy Companies Submitted to: EPRI To Client #12;The Cost of Power Disturbances to Industrial & Digital Economy Companies Confidential

  1. Vet’s company installing solar across Massachusetts

    Broader source: Energy.gov [DOE]

    Dan Leary, a U.S. Army veteran, is president of Nexamp Inc., a clean energy company that specializes in solar installation. Dan founded the company in 2006 and has witnessed its impressive growth from six employees to 65 and counting as of July 2010.

  2. Company name PhiloMetron, Inc. Contact name Carl Edman

    E-Print Network [OSTI]

    Wang, Deli

    description of your company PhiloMetron is a technology incubator with a primary focus on wireless "smart band-aids". We are located in Sorrento Valley. Our first spinout company, Corventis, is focused on at-home heart failure and arrhymia markets. Our current platform derives and expands from this core physiological

  3. The state of the energy service company today

    SciTech Connect (OSTI)

    Mozzo, M.A. Jr.

    1998-10-01T23:59:59.000Z

    Energy service companies have been around for several years. Every year, experts predict their demise. The traditional energy service company (ESCo), whose work utilizes utility rebates, will probably be long gone as rebates disappear. The new energy service company will arise in this industry. This new company will be one that can provide a vast menu of services to their customers. These services can include, but are not necessarily limited to, the following: (1) corporate energy management services, (2) natural gas transportation services, (3) electrical deregulation services, (4) energy engineering services, (5) economics and forecasting, and (6) project financing. The new energy service company must have the engineering, financial, and managerial resources and skills to provide these services. It must also have the ability to recognize the needs of a changing industry and adapt to these changes in order to survive and ultimately provide a benefit to society.

  4. New Columbia River Estuary purchases benefit salmon

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the mouth of the Columbia River to permanently protect riverside habitat for Northwest fish and wildlife, including threatened and endangered salmon and steelhead. The...

  5. Project Management Institute Highlights Savannah River Nuclear...

    Office of Environmental Management (EM)

    employee Matthew Gay uses critical electronic rounds to take a reading at the Savannah River National Laboratory. In one Continuous Improvement initiative, SRNS switched to...

  6. Savannah River Laboratory monthly report, July 1991

    SciTech Connect (OSTI)

    Ferrell, J.M. [comp.

    1991-12-31T23:59:59.000Z

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation; tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

  7. Savannah River Laboratory monthly report, July 1991

    SciTech Connect (OSTI)

    Ferrell, J.M. (comp.)

    1991-01-01T23:59:59.000Z

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation; tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

  8. PIA - Savannah River Nuclear Solutions Electronic Safeguards...

    Energy Savers [EERE]

    System (E3S) PIA - Savannah River Nuclear Solutions Electronic Safeguards Security System (E3S) More Documents & Publications PIA - 10th International Nuclear Graphite...

  9. Lumbee River EMC- Residential Energy Efficiency Program

    Broader source: Energy.gov [DOE]

    Lumbee River EMC (LREMC) offers rebates to its residential customers who purchase and install qualified energy efficient products or services. Rebates are available for water heaters, refrigerator...

  10. The Columbia River System Inside Story

    SciTech Connect (OSTI)

    none,

    2001-04-01T23:59:59.000Z

    The Columbia River is one of the greatest natural resources in the western United States. The river and its tributaries touch the lives of nearly every resident of the Pacific Northwest—from fostering world-famous Pacific salmon to supplying clean natural fuel for 50 to 65 percent of the region’s electrical generation. Since early in the 20th century, public and private agencies have labored to capture the benefits of this dynamic river. Today, dozens of major water resource projects throughout the region are fed by the waters of the Columbia Basin river system.

  11. Savannah River Laboratory monthly report, August 1991

    SciTech Connect (OSTI)

    Ferrell, J.M. [comp.

    1991-12-31T23:59:59.000Z

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation, tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

  12. Savannah River Laboratory monthly report, August 1991

    SciTech Connect (OSTI)

    Ferrell, J.M. (comp.)

    1991-01-01T23:59:59.000Z

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation, tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

  13. South River EMC- Energy Efficient Rebate Program

    Broader source: Energy.gov [DOE]

    South River EMC offers a variety of rebates encouragings its members to invest in energy efficient appliances, equipment, and home upgrades. Incentives are available for clothes washers,...

  14. Wild and Scenic Rivers Act (Maryland)

    Broader source: Energy.gov [DOE]

    It is state policy to protect the outstanding scenic, geologic, ecologic, historic, recreational, agricultural, fish, wildlife, cultural, and other similar values of certain rivers and adjacent...

  15. Savannah River Laboratory monthly report, September 1991

    SciTech Connect (OSTI)

    Ferrell, J.M. (comp.)

    1991-01-01T23:59:59.000Z

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation, tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

  16. Savannah River Laboratory monthly report, September 1991

    SciTech Connect (OSTI)

    Ferrell, J.M. [comp.

    1991-12-31T23:59:59.000Z

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation, tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

  17. Sandia National Laboratories: river current energy converters

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    marine hydrokinetic (MHK) reference models (RMs) for wave energy converters and tidal, ocean, and river current energy converters. The RMP team includes a partnership between...

  18. LBNL/ Adopt Fall Protection Program 2010 Here is the Company Letter Certification Template to address if your company has

    E-Print Network [OSTI]

    Eisen, Michael

    LBNL/ Adopt Fall Protection Program 2010 Here is the Company Letter Certification Template to address if your company has decided to work under LBNL fall protection program. See attached Chapter 30 protection matrix. All fall protection equipment will be inspected before work begins by LBNL SME of fall

  19. Position: Polymer Chemist Company: ExxonMobil Research and Engineering Company, a wholly owned subsidiary of Exxon Mobil

    E-Print Network [OSTI]

    Alpay, S. Pamir

    candidate will apply his or her knowledge to improve existing olefin-based products and develop new ones productive collaborations internally and with outside research organizations, and grow new science areas. JobPosition: Polymer Chemist Company: ExxonMobil Research and Engineering Company, a wholly owned

  20. Comparative Evaluation of Generalized River/Reservoir System Models

    E-Print Network [OSTI]

    Wurbs, Ralph A.

    This report reviews user-oriented generalized reservoir/river system models. The terms reservoir/river system, reservoir system, reservoir operation, or river basin management "model" or "modeling system" are used synonymously to refer to computer...