Sample records for risked technically recoverable

  1. Technically recoverable Devonian shale gas in Ohio

    SciTech Connect (OSTI)

    Kuushraa, V.A.; Wicks, D.E.; Sawyer, W.K.; Esposito, P.R.

    1983-07-01T23:59:59.000Z

    The technically recoverable gas from Devonian shale (Lower and Middle Huron) in Ohio is estimated to range from 6.2 to 22.5 Tcf, depending on the stimulation method and pattern size selected. This estimate of recovery is based on the integration of the most recent data and research on the Devonian Age gas-bearing shales of Ohio. This includes: (1) a compilation of the latest geologic and reservoir data for the gas in-place; (2) analysis of the key productive mechanisms; and, (3) examination of alternative stimulation and production strategies for most efficiently recovering this gas. Beyond a comprehensive assembly of the data and calculation of the technically recoverable gas, the key findings of this report are as follows: a substantial volume of gas is technically recoverable, although advanced (larger scale) stimulation technology will be required to reach economically attractive gas production rates in much of the state; well spacing in certain of the areas can be reduced by half from the traditional 150 to 160 acres per well without severely impairing per-well gas recovery; and, due to the relatively high degree of permeability anisotropy in the Devonian shales, a rectangular, generally 3 by 1 well pattern leads to optimum recovery. Finally, although a consistent geological interpretation and model have been constructed for the Lower and Middle Huron intervals of the Ohio Devonian shale, this interpretation is founded on limited data currently available, along with numerous technical assumptions that need further verification. 11 references, 21 figures, 32 tables.

  2. Technically recoverable Devonian shale gas in West Virginia

    SciTech Connect (OSTI)

    Kuuskraa, V.A.; Wicks, D.E.

    1984-12-01T23:59:59.000Z

    This report evaluates the natural gas potential of the Devonian Age shales of West Virginia. For this, the study: (1) compiles the latest geological and reservoir data to establish the gas in-place; (2) analyzes and models the dominant gas production mechanisms; and (3) examines alternative well stimulation and production strategies for most efficiently recovering the in-place gas. The major findings of the study include the following: (1) The technically recoverable gas from Devonian shale (Huron, Rhinestreet, and Marcellus intervals) in West Virginia is estimated to range from 11 to 44 trillion cubic feet. (2) The Devonian shales in this state entail great geological diversity; the highly fractured, permeable shales in the southwest respond well to traditional development practices while the deep, tight shales in the eastern and northern parts of the state will require new, larger scale well stimulation technology. (3) Beyond the currently developed Huron and Rhinestreet shale intervals, the Marcellus shale offers a third attractive gas zone, particularly in the north central portion of the state. 21 references, 53 figures, 27 tables.

  3. A Methodology to Determine both the Technically Recoverable Resource and the Economically Recoverable Resource in an Unconventional Gas Play

    E-Print Network [OSTI]

    Almadani, Husameddin Saleh A.

    2010-10-12T23:59:59.000Z

    Ultimate Recovery (EUR) for all the wells in a given gas play, to determine the values of the P10 (10th percentile), P50 (50th percentile), and P90 iv (90th percentile) from the CDF. We then use these probability values to calculate the technically... recoverable resource EUR estimated ultimate recovery F&DC finding and development cost LOE lease operating expenses Mcf million cubic feet Mcfe million cubic feet equivalent OGIP original gas in place P(EUR) cumulative distribution...

  4. Figure 8. Technically Recoverable and Commercially Developable Oil

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40CoalLease(Billion2,12803 Table A1.Gas Proved Reserves, WetGasCubic38. Technically

  5. RISK ASSESSMENT TECHNICAL EXPERT WORKING GROUP

    Broader source: Energy.gov [DOE]

    The Risk Assessment Technical Expert Working Group (RWG) is established to assist the Department of Energy (DOE) with the appropriate and effective use of quantitative risk assessment in nuclear...

  6. Managing Technical Risk: Understanding Private Sector

    E-Print Network [OSTI]

    action. Our study seeks to inform the decisions of both government managers and private entrepreneursApril 2000 Managing Technical Risk: Understanding Private Sector Decision Making on Early Stage 00-787 Managing Technical Risk Understanding Private Sector Decision Making on Early Stage Technology

  7. Preliminary Technical Risk Analysis for the Geothermal Technologies...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Preliminary Technical Risk Analysis for the Geothermal Technologies Program Preliminary Technical Risk Analysis for the Geothermal Technologies Program This report explains the...

  8. RISK REDUCTION THROUGH USE OF EXTERNAL TECHNICAL REVIEWS, TECHNOLOGY READINESS ASSESSMENTS AND TECHNICAL RISK RATINGS - 9174

    SciTech Connect (OSTI)

    Cercy, M; Steven P Schneider, S; Kurt D Gerdes, K

    2008-12-12T23:59:59.000Z

    The U.S. Department of Energy's Office of Environmental Management (DOE-EM) was established to achieve the safe and compliant disposition of legacy wastes and facilities from defense nuclear applications. A large majority of these wastes and facilities are 'one-of-a-kind' and unique to DOE. Many of the programs to treat these wastes have been 'first-of-a-kind' and unprecedented in scope and complexity. This has meant that many of the technologies needed to successfully disposition these wastes were not yet developed or required significant re-engineering to be adapted for DOE-EM's needs. The DOE-EM program believes strongly in reducing the technical risk of its projects and has initiated several efforts to reduce those risks: (1) Technology Readiness Assessments to reduce the risks of deployment of new technologies; (2) External Technical Reviews as one of several steps to ensure the timely resolution of engineering and technology issues; and (3) Technical Risk Ratings as a means to monitor and communicate information about technical risks. This paper will present examples of how Technology Readiness Assessments, External Technical Reviews, and Technical Risk Ratings are being used by DOE-EM to reduce technical risks.

  9. RISK REDUCTION THROUGH USE OF EXTERNAL TECHNICAL REVIEWS, TECHNOLOGY READINESS ASSESSMENTS AND TECHNICAL RISK RATINGS - 9174

    SciTech Connect (OSTI)

    Cercy, M; Steven P Schneider, S; Kurt D Gerdes, K

    2009-01-15T23:59:59.000Z

    The U.S. Department of Energy's Office of Environmental Management (DOE-EM) was established to achieve the safe and compliant disposition of legacy wastes and facilities from defense nuclear applications. A large majority of these wastes and facilities are 'one-of-a-kind' and unique to DOE. Many of the programs to treat these wastes have been 'first-of-a-kind' and unprecedented in scope and complexity. This has meant that many of the technologies needed to successfully disposition these wastes were not yet developed or required significant re-engineering to be adapted for DOE-EM's needs. The DOE-EM program believes strongly in reducing the technical risk of its projects and has initiated several efforts to reduce those risks: (1) Technology Readiness Assessments to reduce the risks of deployment of new technologies; (2) External Technical Reviews as one of several steps to ensure the timely resolution of engineering and technology issues; and (3) Technical Risk Ratings as a means to monitor and communicate information about technical risks. This paper will present examples of how Technology Readiness Assessments, External Technical Reviews, and Technical Risk Ratings are being used by DOE-EM to reduce technical risks.

  10. Figure 8. Technically Recoverable and Commercially Developable...

    U.S. Energy Information Administration (EIA) Indexed Site

    the Alaska North Slope fig8.jpg (38547 bytes) Source: United States Geological Survey, "Economics of Undiscovered Oil in the 1002 Area of the Arctic National Wildlife Refuge," 1998...

  11. Environmental effects of dredging. Risk assessment: An overview of the process. Technical note

    SciTech Connect (OSTI)

    Dillon, T.M.; Engler, R.M.

    1991-12-01T23:59:59.000Z

    This technical note provides a nontechnical overview of the risk assessment process. A companion technical note regarding risk assessment terminology will be published in the near future.

  12. TWRS safety and technical integration risk management plan

    SciTech Connect (OSTI)

    Fordham, R.A.

    1996-03-12T23:59:59.000Z

    The objectives of the Tank Waste Remediation System (TWRS) Safety and Technical Integration (STI) programmatic risk management program are to assess, analyze, and handle risks associated with TWRS STI responsibilities and to communicate information about the actions being taken and the results to enable decision making. The objective of this TWRS STI Risk Management Plan is to communicate a consistent approach to risk management that will be used by the organization.

  13. Technical, economic and risk analysis of multilateral wells

    E-Print Network [OSTI]

    Arcos Rueda, Dulce Maria

    2009-05-15T23:59:59.000Z

    TECHNICAL, ECONOMIC AND RISK ANALYSIS OF MULTILATERAL WELLS A Thesis by DULCE MARIA ARCOS RUEDA Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree... of MASTER OF SCIENCE December 2008 Major Subject: Petroleum Engineering TECHNICAL, ECONOMIC AND RISK ANALYSIS OF MULTILATERAL WELLS A Thesis by DULCE MARIA ARCOS RUEDA Submitted to the Office of Graduate Studies of Texas A...

  14. A socio-technical account of risk

    E-Print Network [OSTI]

    Dean, Wesley Raymond

    1994-01-01T23:59:59.000Z

    to determining risk. Roger E. and Jeanne X. Kasperson propose a conception of risk that is nevertheless still a species of the positivist concept. Unlike Starr and Whipple, the Kaspersons conception of risk focuses heavily on the influence of the human... Roger and Jeanne Kasperson. Not only does she question the manner in which risks are chosen for analysis, she also challenges the legitimacy of the methodologies associated with quantitative risk analysis. Jasanoff does this by performing a cross...

  15. A socio-technical account of risk 

    E-Print Network [OSTI]

    Dean, Wesley Raymond

    1994-01-01T23:59:59.000Z

    . The final task of this thesis is to apply this expanded contextualist notion of risk to a case study. The explanations provided by two investigatory teams involved in an outbreak of anencephalic births in Cameron County, Texas will be examined. These two...

  16. Dredging/dredged material management risk assessment. Technical note

    SciTech Connect (OSTI)

    NONE

    1998-09-01T23:59:59.000Z

    This technical note explains the use of risk assessment to facilitate dredged material management decision-making in navigable waterways by US Army Corps of Engineer (USACE) project managers and field operations personnel. The document does not promote risk assessment as a tool for use in every dredged material management decision. It is likely to be most useful, and most used, in those cases that constitute the exception rather than the rule. The use of risk assessment is intended to supplement the analytical options currently available to dredged material managers by building on the existing technical framework (US Environmental Protection Agency (USEPA)/USACE 1992) and the existing tiered approaches (USEPA/USACE 1991, 1998).

  17. Quantitative analysis of the economically recoverable resource

    SciTech Connect (OSTI)

    Pulle, C.V.; Seskus, A.P.

    1981-05-01T23:59:59.000Z

    The objective of this study is to obtain estimates of the economically recoverable gas in the Appalachian Basin. The estimates were obtained in terms of a probability distribution, which quantifies the inherent uncertainty associated with estimates where geologic and production uncertainties prevail. It is established that well productivity on a county and regional basis is lognormally distributed, and the total recoverable gas is Normally distributed. The expected (mean), total economically recoverable gas is 20.2 trillion cubic feet (TCF) with a standard deviation of 1.6 TCF, conditional on the use of shooting technology on 160-acre well-spacing. From properties of the Normal distribution, it is seen that a 95 percent probability exists for the total recoverable gas to lie between 17.06 and 23.34 TCF. The estimates are sensitive to well spacings and the technology applied to a particular geologic environment. It is observed that with smaller well spacings - for example, at 80 acres - the estimate is substantially increased, and that advanced technology, such as foam fracturing, has the potential of significantly increasing gas recovery. However, the threshold and optimum conditions governing advanced exploitation technology, based on well spacing and other parameters, were not analyzed in this study. Their technological impact on gas recovery is mentioned in the text where relevant; and on the basis of a rough projection an additional 10 TCF could be expected with the use of foam fracturing on wells with initial open flows lower than 300 MCFD. From the exploration point of view, the lognormal distribution of well productivity suggests that even in smaller areas, such as a county basis, intense exploration might be appropriate. This is evident from the small tail probabilities of the lognormal distribution, which represent the small number of wells with relatively very high productivity.

  18. Risk Assessment Technical Experts Working Group | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's PossibleRadiation Protection TechnicalResonantNovember 15 to March 15A MegawattElectricity: 30Risk

  19. Feasibility assessment of a risk-based approach to technical specifications

    SciTech Connect (OSTI)

    Atefi, B.; Gallagher, D.W. (Science Applications International Corp., McLean, VA (USA))

    1991-05-01T23:59:59.000Z

    To assess the potential use of risk and reliability techniques for improving the effectiveness of the technical specifications to control plant operational risk, the Technical Specifications Branch of the Nuclear Regulatory Commission initiated an effort to identify and evaluate alternative risk-based approaches that could bring greater risk perspective to these requirements. In the first phase four alternative approaches were identified and their characteristics were analyzed. Among these, the risk-based approach to technical specifications is the most promising approach for controlling plant operational risk using technical specifications. The second phase of the study concentrated on detailed characteristics of the real time risk-based approach. It is concluded that a real time risk-based approach to technical specifications has the potential to improve both plant safety and availability. 33 figs., 5 figs., 6 tabs.

  20. Risk Assessment Technical Expert Working Group (RWG) Conference Call Minutes, March 8, 2010

    Broader source: Energy.gov [DOE]

    Risk Assessment Technical Experts Working Group Charter – The steeringcommittee discussed the draft charter. Two recommended changes were agreed upon:• A sentence will be added to identify that the...

  1. Risk Assessment Technical Expert Working Group (RWG)Conference Call Minutes, February 20, 2010

    Broader source: Energy.gov [DOE]

    Risk Assessment Technical Experts Working Group Charter – discussed whoshould sign and at what level the charter should be authorized. It was concluded thatthe Under Secretaries as the Central...

  2. Technically Recoverable Shale Oil and Shale Gas Resources

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our InstagramStructureProposedPAGESafety Tag:8,, 20153 To.T. J.

  3. Feasibility assessment of a risk-based approach to technical specifications

    SciTech Connect (OSTI)

    Atefi, B.; Gallagher, D.W. (Science Applications International Corp., McLean, VA (USA))

    1991-05-01T23:59:59.000Z

    The first phase of the assessment concentrates on (1) identification of selected risk-based approaches for improving current technical specifications, (2) appraisal of characteristics of each approach, including advantages and disadvantages, and (3) recommendation of one or more approaches that might result in improving current technical specification requirements. The second phase of the work concentrates on assessment of the feasibility of implementation of a pilot program to study detailed characteristics of the preferred approach. The real time risk-based approach was identified as the preferred approach to technical specifications for controlling plant operational risk. There do not appear to be any technical or institutional obstacles to prevent initiation of a pilot program to assess the characteristics and effectiveness of such an approach. 2 tabs.

  4. Environmental effects of dredging. Risk-based testing of dredged material for aquatic disposal evaluations. Technical note

    SciTech Connect (OSTI)

    Dillon, T.M.; Engler, R.M.; Patin, T.R.

    1992-12-01T23:59:59.000Z

    This technical note describes a risk-based framework for testing and evaluating dredged material scheduled for open-water disposal.

  5. A Methodology to Determine both the Technically Recoverable Resource and the Economically Recoverable Resource in an Unconventional Gas Play 

    E-Print Network [OSTI]

    Almadani, Husameddin Saleh A.

    2010-10-12T23:59:59.000Z

    for unconventional plays. To develop our methodology, we have performed an extensive economic analysis using data from the Barnett Shale, as a representative case study. We have used the cumulative distribution function (CDF) of the values of the Estimated Ultimate...

  6. Handbook of methods for risk-based analysis of Technical Specification requirements

    SciTech Connect (OSTI)

    Samanta, P.K.; Vesely, W.E.

    1993-12-31T23:59:59.000Z

    Technical Specifications (TS) requirements for nuclear power plants define the Limiting Conditions for Operation (LCOs) and Surveillance Requirements (SRs) to assure safety during operation. In general, these requirements were based on deterministic analysis and engineering judgments. Experiences with plant operation indicate that some elements of the requirements are unnecessarily restrictive, while others may not be conducive to safety. Improvements in these requirements are facilitated by the availability of plant specific Probabilistic Safety Assessments (PSAs). The use of risk and reliability-based methods to improve TS requirements has gained wide interest because these methods can: quantitatively evaluate the risk impact and justify changes based on objective risk arguments. Provide a defensible basis for these requirements for regulatory applications. The United States Nuclear Regulatory Commission (USNRC) Office of Research is sponsoring research to develop systematic risk-based methods to improve various aspects of TS requirements. The handbook of methods, which is being prepared, summarizes such risk-based methods. The scope of the handbook includes reliability and risk-based methods for evaluating allowed outage times (AOTs), action statements requiring shutdown where shutdown risk may be substantial, surveillance test intervals (STIs), defenses against common-cause failures, managing plant configurations, and scheduling maintenances. For each topic, the handbook summarizes methods of analysis and data needs, outlines the insights to be gained, lists additional references, and presents examples of evaluations.

  7. Table 15. Recoverable Coal Reserves at Producing Mines, Estimated Recoverable Reserves, and Demonstrated Reserve Base by Mining

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTownDells,1Stocks Nov-14 Dec-14TableConferenceInstalled:a. AverageRecoverable

  8. Advanced Small Modular Reactor (SMR) Probabilistic Risk Assessment (PRA) Technical Exchange Meeting

    SciTech Connect (OSTI)

    Curtis Smith

    2013-09-01T23:59:59.000Z

    During FY13, the INL developed an advanced SMR PRA framework which has been described in the report Small Modular Reactor (SMR) Probabilistic Risk Assessment (PRA) Detailed Technical Framework Specification, INL/EXT-13-28974 (April 2013). In this framework, the various areas are considered: Probabilistic models to provide information specific to advanced SMRs Representation of specific SMR design issues such as having co-located modules and passive safety features Use of modern open-source and readily available analysis methods Internal and external events resulting in impacts to safety All-hazards considerations Methods to support the identification of design vulnerabilities Mechanistic and probabilistic data needs to support modeling and tools In order to describe this framework more fully and obtain feedback on the proposed approaches, the INL hosted a technical exchange meeting during August 2013. This report describes the outcomes of that meeting.

  9. Heavy oil reservoirs recoverable by thermal technology. Annual report

    SciTech Connect (OSTI)

    Kujawa, P.

    1981-02-01T23:59:59.000Z

    This volume contains reservoir, production, and project data for target reservoirs thermally recoverable by steam drive which are equal to or greater than 2500 feet deep and contain heavy oil in the 8 to 25/sup 0/ API gravity range. Data were collected from three source types: hands-on (A), once-removed (B), and twice-removed (C). In all cases, data were sought depicting and characterizing individual reservoirs as opposed to data covering an entire field with more than one producing interval or reservoir. The data sources are listed at the end of each case. This volume also contains a complete listing of operators and projects, as well as a bibliography of source material.

  10. Handbook of methods for risk-based analyses of technical specifications

    SciTech Connect (OSTI)

    Samanta, P.K.; Kim, I.S. [Brookhaven National Lab., Upton, NY (United States); Mankamo, T. [Avaplan Oy, Espoo (Finland); Vesely, W.E. [Science Applications International Corp., Dublin, OH (United States)

    1994-12-01T23:59:59.000Z

    Technical Specifications (TS) requirements for nuclear power plants define the Limiting Conditions for Operation (LCOs) and Surveillance Requirements (SRs) to assure safety during operation. In general, these requirements are based on deterministic analysis and engineering judgments. Experiences with plant operation indicate that some elements of the requirements are unnecessarily restrictive, while a few may not be conducive to safety. The US Nuclear Regulatory Commission (USNRC) Office of Research has sponsored research to develop systematic risk-based methods to improve various aspects of TS requirements. This handbook summarizes these risk-based methods. The scope of the handbook includes reliability and risk-based methods for evaluating allowed outage times (AOTs), scheduled or preventive maintenance, action statements requiring shutdown where shutdown risk may be substantial, surveillance test intervals (STIs), and management of plant configurations resulting from outages of systems, or components. For each topic, the handbook summarizes analytic methods with data needs, outlines the insights to be gained, lists additional references, and gives examples of evaluations.

  11. Data development technical support document for the aircraft crash risk analysis methodology (ACRAM) standard

    SciTech Connect (OSTI)

    Kimura, C.Y.; Glaser, R.E.; Mensing, R.W.; Lin, T.; Haley, T.A.; Barto, A.B.; Stutzke, M.A.

    1996-08-01T23:59:59.000Z

    The Aircraft Crash Risk Analysis Methodology (ACRAM) Panel has been formed by the US Department of Energy Office of Defense Programs (DOE/DP) for the purpose of developing a standard methodology for determining the risk from aircraft crashes onto DOE ground facilities. In order to accomplish this goal, the ACRAM panel has been divided into four teams, the data development team, the model evaluation team, the structural analysis team, and the consequence team. Each team, consisting of at least one member of the ACRAM plus additional DOE and DOE contractor personnel, specializes in the development of the methodology assigned to that team. This report documents the work performed by the data development team and provides the technical basis for the data used by the ACRAM Standard for determining the aircraft crash frequency. This report should be used to provide the generic data needed to calculate the aircraft crash frequency into the facility under consideration as part of the process for determining the aircraft crash risk to ground facilities as given by the DOE Standard Aircraft Crash Risk Assessment Methodology (ACRAM). Some broad guidance is presented on how to obtain the needed site-specific and facility specific data but this data is not provided by this document.

  12. Technical Needs for Enhancing Risk Monitors with Equipment Condition Assessment for Advanced Small Modular Reactors

    SciTech Connect (OSTI)

    Coble, Jamie B.; Coles, Garill A.; Ramuhalli, Pradeep; Meyer, Ryan M.; Berglin, Eric J.; Wootan, David W.; Mitchell, Mark R.

    2013-04-04T23:59:59.000Z

    Advanced small modular reactors (aSMRs) can provide the United States with a safe, sustainable, and carbon-neutral energy source. The controllable day-to-day costs of aSMRs are expected to be dominated by operation and maintenance costs. Health and condition assessment coupled with online risk monitors can potentially enhance affordability of aSMRs through optimized operational planning and maintenance scheduling. Currently deployed risk monitors are an extension of probabilistic risk assessment (PRA). For complex engineered systems like nuclear power plants, PRA systematically combines event likelihoods and the probability of failure (POF) of key components, so that when combined with the magnitude of possible adverse consequences to determine risk. Traditional PRA uses population-based POF information to estimate the average plant risk over time. Currently, most nuclear power plants have a PRA that reflects the as-operated, as-modified plant; this model is updated periodically, typically once a year. Risk monitors expand on living PRA by incorporating changes in the day-by-day plant operation and configuration (e.g., changes in equipment availability, operating regime, environmental conditions). However, population-based POF (or population- and time-based POF) is still used to populate fault trees. Health monitoring techniques can be used to establish condition indicators and monitoring capabilities that indicate the component-specific POF at a desired point in time (or over a desired period), which can then be incorporated in the risk monitor to provide a more accurate estimate of the plant risk in different configurations. This is particularly important for active systems, structures, and components (SSCs) proposed for use in aSMR designs. These SSCs may differ significantly from those used in the operating fleet of light-water reactors (or even in LWR-based SMR designs). Additionally, the operating characteristics of aSMRs can present significantly different requirements, including the need to operate in different coolant environments, higher operating temperatures, and longer operating cycles between planned refueling and maintenance outages. These features, along with the relative lack of operating experience for some of the proposed advanced designs, may limit the ability to estimate event probability and component POF with a high degree of certainty. Incorporating real-time estimates of component POF may compensate for a relative lack of established knowledge about the long-term component behavior and improve operational and maintenance planning and optimization. The particular eccentricities of advanced reactors and small modular reactors provide unique challenges and needs for advanced instrumentation, control, and human-machine interface (ICHMI) techniques such as enhanced risk monitors (ERM) in aSMRs. Several features of aSMR designs increase the need for accurate characterization of the real-time risk during operation and maintenance activities. A number of technical gaps in realizing ERM exist, and these gaps are largely independent of the specific reactor technology. As a result, the development of a framework for ERM would enable greater situational awareness regardless of the specific class of reactor technology. A set of research tasks are identified in a preliminary research plan to enable the development, testing, and demonstration of such a framework. Although some aspects of aSMRs, such as specific operational characteristics, will vary and are not now completely defined, the proposed framework is expected to be relevant regardless of such uncertainty. The development of an ERM framework will provide one of the key technical developments necessary to ensure the economic viability of aSMRs.

  13. 2009 Technical Risk and Uncertainty Analysis of the U.S. Department of Energy's Solar Energy Technologies Program Concentrating Solar Power and Photovoltaics R&D

    SciTech Connect (OSTI)

    McVeigh, J.; Lausten, M.; Eugeni, E.; Soni, A.

    2010-11-01T23:59:59.000Z

    The U.S. Department of Energy (DOE) Solar Energy Technologies Program (SETP) conducted a 2009 Technical Risk and Uncertainty Analysis to better assess its cost goals for concentrating solar power (CSP) and photovoltaic (PV) systems, and to potentially rebalance its R&D portfolio. This report details the methodology, schedule, and results of this technical risk and uncertainty analysis.

  14. Light Water Reactor Sustainability Program Technical Basis Guide Describing How to Perform Safety Margin Configuration Risk Management

    SciTech Connect (OSTI)

    Curtis Smith; James Knudsen; Bentley Harwood

    2013-08-01T23:59:59.000Z

    The INL has carried out a demonstration of the RISMC approach for the purpose of configuration risk management. We have shown how improved accuracy and realism can be achieved by simulating changes in risk – as a function of different configurations – in order to determine safety margins as the plant is modified. We described the various technical issues that play a role in these configuration-based calculations with the intent that future applications can take advantage of the analysis benefits while avoiding some of the technical pitfalls that are found for these types of calculations. Specific recommendations have been provided on a variety of topics aimed at improving the safety margin analysis and strengthening the technical basis behind the analysis process.

  15. Uncertainty Quantification in the Reliability and Risk Assessment of Generation IV Reactors: Final Scientific/Technical Report

    SciTech Connect (OSTI)

    Vierow, Karen; Aldemir, Tunc

    2009-09-10T23:59:59.000Z

    The project entitled, “Uncertainty Quantification in the Reliability and Risk Assessment of Generation IV Reactors”, was conducted as a DOE NERI project collaboration between Texas A&M University and The Ohio State University between March 2006 and June 2009. The overall goal of the proposed project was to develop practical approaches and tools by which dynamic reliability and risk assessment techniques can be used to augment the uncertainty quantification process in probabilistic risk assessment (PRA) methods and PRA applications for Generation IV reactors. This report is the Final Scientific/Technical Report summarizing the project.

  16. Disposal of NORM-contaminated oil field wastes in salt caverns -- Legality, technical feasibility, economics, and risk

    SciTech Connect (OSTI)

    Veil, J.A.; Smith, K.P.; Tomasko, D.; Elcock, D.; Blunt, D.; Williams, G.P.

    1998-07-01T23:59:59.000Z

    Some types of oil and gas production and processing wastes contain naturally occurring radioactive materials (NORM). If NORM is present at concentrations above regulatory levels in oil field waste, the waste requires special disposal practices. The existing disposal options for wastes containing NORM are limited and costly. This paper evaluates the legality, technical feasibility, economics, and human health risk of disposing of NORM-contaminated oil field wastes in salt caverns. Cavern disposal of NORM waste is technically feasible and poses a very low human health risk. From a legal perspective, there are no fatal flaws that would prevent a state regulatory agency from approaching cavern disposal of NORM. On the basis of the costs charged by caverns currently used for disposal of nonhazardous oil field waste (NOW), NORM waste disposal caverns could be cost competitive with existing NORM waste disposal methods when regulatory agencies approve the practice.

  17. Reduction of risk to the marine environment from oilfield chemicals - balancing environmental and technical needs

    SciTech Connect (OSTI)

    O`Neill, J.E.; Hill, D.G.

    1996-12-31T23:59:59.000Z

    The study argues that the regulation of offshore use of hazardous chemicals for oilfield stimulation and Completion applications is an important but not a total solution to reduce marine pollution from offshore sources. The aim of the study is to demonstrate that for a complete solution, chemical reformulation must be considered hand-in-band with improved operational practices to provide a maximum effect on overall risk reduction. The study is directed at one major service company`s approach to the whole issue of chemical management in the 1990s, based mainly on North Sea experience in cementing, drilling fluid and stimulation activities. Oilfield chemicals are incorporated into a fluid design to solve a specific technical problem in a well, such as well completion, stimulation and damage removal. While it is desirable to replace all the harmful chemicals, the practicalities of doing so are limited if the industry is to continue to produce efficiently. Other alternatives need consideration. By their very chemistry, some chemicals have primary active ingredients which may be harmful if discharged into the environment. Improving the characteristics of chemicals to marine life requires the change of previously acceptable products, such as the elimination of banned materials as well as incorporating components with reduced toxicity and greater biodegradability. The idealistic goal is the immediate replacement of all chemicals by nontoxic, biodegrade alternatives; the practical solution is replacement reformulation where possible and the improved isolation the oilwell and marine environments through improvements in continuous-mix technology along with reduction of the chemicals by better job design.

  18. A model problem concerning recoverable strains of shape-memory polycrystals

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    A model problem concerning recoverable strains of shape-memory polycrystals K. Bhattacharya(1- tivated by the study of the shape-memory effect in polycrystalline media. Specifi- cally, it numerically This paper addresses a model problem of nonlinear homogenization in the plane motivated by the shape-memory

  19. Recoverable Resource Estimate of Identified Onshore Geopressured Geothermal Energy in Texas and Louisiana (Presentation)

    SciTech Connect (OSTI)

    Esposito, A.; Augustine, C.

    2012-04-01T23:59:59.000Z

    Geopressured geothermal reservoirs are characterized by high temperatures and high pressures with correspondingly large quantities of dissolved methane. Due to these characteristics, the reservoirs provide two sources of energy: chemical energy from the recovered methane, and thermal energy from the recovered fluid at temperatures high enough to operate a binary power plant for electricity production. Formations with the greatest potential for recoverable energy are located in the gulf coastal region of Texas and Louisiana where significantly overpressured and hot formations are abundant. This study estimates the total recoverable onshore geopressured geothermal resource for identified sites in Texas and Louisiana. In this study a geopressured geothermal resource is defined as a brine reservoir with fluid temperature greater than 212 degrees F and a pressure gradient greater than 0.7 psi/ft.

  20. Risk Informed Assessment of Regulatory and Design Requirements for Future Nuclear Power Plants - Final Technical Report

    SciTech Connect (OSTI)

    Ritterbusch, Stanley; Golay, Michael; Duran, Felicia; Galyean, William; Gupta, Abhinav; Dimitrijevic, Vesna; Malsch, Marty

    2003-01-29T23:59:59.000Z

    OAK B188 Summary of methods proposed for risk informing the design and regulation of future nuclear power plants. All elements of the historical design and regulation process are preserved, but the methods proposed for new plants use probabilistic risk assessment methods as the primary decision making tool.

  1. Risk Assessment Technical Expert Working Group (RWG)Conference Call Minutes, May 6, 2010

    Broader source: Energy.gov [DOE]

    Risk Assessment Information Notice (IN): HSS provided the draft IN to safety basis experts fromSNL, Y-12 and PNNL for their review and comment. Their comments were addressed and the IN isback into...

  2. Technical Report on Preliminary Methodology for Enhancing Risk Monitors with Integrated Equipment Condition Assessment

    SciTech Connect (OSTI)

    Ramuhalli, Pradeep; Coles, Garill A.; Coble, Jamie B.; Hirt, Evelyn H.

    2013-09-17T23:59:59.000Z

    Small modular reactors (SMRs) generally include reactors with electric output of ~350 MWe or less (this cutoff varies somewhat but is substantially less than full-size plant output of 700 MWe or more). Advanced SMRs (AdvSMRs) refer to a specific class of SMRs and are based on modularization of advanced reactor concepts. AdvSMRs may provide a longer-term alternative to traditional light-water reactors (LWRs) and SMRs based on integral pressurized water reactor concepts currently being considered. Enhancing affordability of AdvSMRs will be critical to ensuring wider deployment. AdvSMRs suffer from loss of economies of scale inherent in small reactors when compared to large (~greater than 600 MWe output) reactors. Some of this loss can be recovered through reduced capital costs through smaller size, fewer components, modular fabrication processes, and the opportunity for modular construction. However, the controllable day-to-day costs of AdvSMRs will be dominated by operation and maintenance (O&M) costs. Technologies that help characterize real-time risk are important for controlling O&M costs. Risk monitors are used in current nuclear power plants to provide a point-in-time estimate of the system risk given the current plant configuration (e.g., equipment availability, operational regime, and environmental conditions). However, current risk monitors are unable to support the capability requirements listed above as they do not take into account plant-specific normal, abnormal, and deteriorating states of active components and systems. This report documents technology developments that are a step towards enhancing risk monitors that, if integrated with supervisory plant control systems, can provide the capability requirements listed and meet the goals of controlling O&M costs. The report describes research results from an initial methodology for enhanced risk monitors by integrating real-time information about equipment condition and POF into risk monitors.

  3. Process for removing copper in a recoverable form from solid scrap metal

    DOE Patents [OSTI]

    Hartman, Alan D. (Albany, OR); Oden, Laurance L. (Albany, OR); White, Jack C. (Albany, OR)

    1995-01-01T23:59:59.000Z

    A process for removing copper in a recoverable form from a copper/solid ferrous scrap metal mix is disclosed. The process begins by placing a copper/solid ferrous scrap metal mix into a reactor vessel. The atmosphere within the reactor vessel is purged with an inert gas or oxidizing while the reactor vessel is heated in the area of the copper/solid ferrous scrap metal mix to raise the temperature within the reactor vessel to a selected elevated temperature. Air is introduced into the reactor vessel and thereafter hydrogen chloride is introduced into the reactor vessel to obtain a desired air-hydrogen chloride mix. The air-hydrogen chloride mix is operable to form an oxidizing and chloridizing atmosphere which provides a protective oxide coating on the surface of the solid ferrous scrap metal in the mix and simultaneously oxidizes/chloridizes the copper in the mix to convert the copper to a copper monochloride gas for transport away from the solid ferrous scrap metal. After the copper is completely removed from the copper/solid ferrous scrap metal mix, the flows of air and hydrogen chloride are stopped and the copper monochloride gas is collected for conversion to a recoverable copper species.

  4. Geopressured Geothermal Resource and Recoverable Energy Estimate for the Wilcox and Frio Formations, Texas (Presentation)

    SciTech Connect (OSTI)

    Esposito, A.; Augustine, C.

    2011-10-01T23:59:59.000Z

    An estimate of the total and recoverable geopressured geothermal resource of the fairways in the Wilcox and Frio formations is made using the current data available. The flow rate of water and methane for wells located in the geopressured geothermal fairways is simulated over a 20-year period utilizing the TOUGH2 Reservoir Simulator and research data. The model incorporates relative permeability, capillary pressure, rock compressibility, and leakage from the bounding shale layers. The simulations show that permeability, porosity, pressure, sandstone thickness, well spacing, and gas saturation in the sandstone have a significant impact on the percent of energy recovered. The results also predict lower average well production flow rates and a significantly higher production of natural gas relative to water than in previous studies done from 1975 to 1980. Previous studies underestimate the amount of methane produced with hot brine. Based on the work completed in this study, multiphase flow processes and reservoir boundary conditions greatly influence the total quantity of the fluid produced as well as the ratio of gas and water in the produced fluid.

  5. Recoverable natural gas reserves from Jurassic Norphlet Formation, Alabama coastal waters

    SciTech Connect (OSTI)

    Mancini, E.A.; Mink, R.M.; Bearden, B.L.; Hamilton, R.P.

    1987-09-01T23:59:59.000Z

    To date, 11 Norphlet gas fields have been established in offshore Alabama. These fields are part of a deep Jurassic gas trend that extends across southern Mississippi and Alabama into the Gulf of Mexico. Recoverable gas reserves of 4.9-8.1 tcf are estimated for the Norphlet Formation in Alabama's coastal waters. Proven gas reserves are estimated to be 3.7-4.6 tcf and potential reserves are estimated to be 1.2-3.5 tcf. The natural gas is trapped in a series of generally east-west-trending salt anticlines. The mechanism of structure formation appears to be salt flowage that has formed broad, low-relief anticlines, most of which are faulted, and many of which are related to small-scale growth faults. Salt movement is the critical factor in the formation of these petroleum traps. The primary Norphlet reservoir lithofacies are eolian dune and interdune sandstones that range in thickness from 140 to over 600 ft in Alabama's coastal waters. Gas pay can exceed 280 ft in thickness. Porosity is principally secondary, developed as a result of decementation and grain dissolution. Jurassic Smackover algal carbonate mudstones were the main source for the Norphlet hydrocarbons. The seal for the gas is the nonpermeable upper portion of the Norphlet Formation. The overlying lower Smackover carbonates are also nonpermeable and may serve as part of the seal.

  6. Report on the technical workshop on WTI incinerator risk issues. Held in Washington, DC on December 8-9, 1993

    SciTech Connect (OSTI)

    Not Available

    1993-12-01T23:59:59.000Z

    The report includes information and materials from a peer review workshop organized by EPA's Risk Assessment Forum (RAF) for the Office of Solid Waste and Emergency Response and Region 5. The meeting was held in Washington, DC, at the Holiday Inn Capitol on December 8-9, 1993. The subject of the peer review was a draft project plan prepared by EPA Region 5 for assessing risk at an incinerator operated by Waste Technologies Industries (WTI) in East Liverpool, Ohio. The peer review panel was convened to evaluate the project plan as the scientific foundation for a risk assessment, which will be used in setting final permit conditions for the WTI facility.

  7. Reference computations of public dose and cancer risk from airborne releases of plutonium. Nuclear safety technical report

    SciTech Connect (OSTI)

    Peterson, V.L.

    1993-12-23T23:59:59.000Z

    This report presents results of computations of doses and the associated health risks of postulated accidental atmospheric releases from the Rocky Flats Plant (RFP) of one gram of weapons-grade plutonium in a form that is respirable. These computations are intended to be reference computations that can be used to evaluate a variety of accident scenarios by scaling the dose and health risk results presented here according to the amount of plutonium postulated to be released, instead of repeating the computations for each scenario. The MACCS2 code has been used as the basis of these computations. The basis and capabilities of MACCS2 are summarized, the parameters used in the evaluations are discussed, and results are presented for the doses and health risks to the public, both the Maximum Offsite Individual (a maximally exposed individual at or beyond the plant boundaries) and the population within 50 miles of RFP. A number of different weather scenarios are evaluated, including constant weather conditions and observed weather for 1990, 1991, and 1992. The isotopic mix of weapons-grade plutonium will change as it ages, the {sup 241}Pu decaying into {sup 241}Am. The {sup 241}Am reaches a peak concentration after about 72 years. The doses to the bone surface, liver, and whole body will increase slightly but the dose to the lungs will decrease slightly. The overall cancer risk will show almost no change over this period. This change in cancer risk is much smaller than the year-to-year variations in cancer risk due to weather. Finally, x/Q values are also presented for other applications, such as for hazardous chemical releases. These include the x/Q values for the MOI, for a collocated worker at 100 meters downwind of an accident site, and the x/Q value integrated over the population out to 50 miles.

  8. Technical Brief

    E-Print Network [OSTI]

    Depleted Uranium; Brian Littleton

    2006-01-01T23:59:59.000Z

    ii iiiFOREWARD The Depleted Uranium Technical Brief is designed to convey available information and knowledge about depleted uranium to EPA Remedial Project Managers, On-Scene Coordinators, contractors, and other Agency managers involved with the remediation of sites contaminated with this material. It addresses relative questions regarding the chemical and radiological health concerns involved with depleted uranium in the environment. This technical brief was developed to address the common misconception that depleted uranium represents only a radiological health hazard. It provides accepted data and references to additional sources for both the radiological and chemical characteristics, health risk as well as references for both the monitoring and measurement and applicable treatment techniques for depleted uranium. Please Note: This document has been changed from the original publication dated

  9. Urban Mining: Quality and quantity of recyclable and recoverable material mechanically and physically extractable from residual waste

    SciTech Connect (OSTI)

    Di Maria, Francesco, E-mail: francesco.dimaria@unipg.it; Micale, Caterina; Sordi, Alessio; Cirulli, Giuseppe; Marionni, Moreno

    2013-12-15T23:59:59.000Z

    Highlights: • Material recycling and recovery from residual waste by physical and mechanical process has been investigated. • About 6% of recyclable can be extracted by NIR and 2-3Dimension selector. • Another 2% of construction materials can be extracted by adopting modified soil washing process. • Extracted material quality is quite high even some residual heavy metal have been detected by leaching test. - Abstract: The mechanically sorted dry fraction (MSDF) and Fines (<20 mm) arising from the mechanical biological treatment of residual municipal solid waste (RMSW) contains respectively about 11% w/w each of recyclable and recoverable materials. Processing a large sample of MSDF in an existing full-scale mechanical sorting facility equipped with near infrared and 2-3 dimensional selectors led to the extraction of about 6% w/w of recyclables with respect to the RMSW weight. Maximum selection efficiency was achieved for metals, about 98% w/w, whereas it was lower for Waste Electrical and Electronic Equipment (WEEE), about 2% w/w. After a simulated lab scale soil washing treatment it was possible to extract about 2% w/w of inert exploitable substances recoverable as construction materials, with respect to the amount of RMSW. The passing curve showed that inert materials were mainly sand with a particle size ranging from 0.063 to 2 mm. Leaching tests showed quite low heavy metal concentrations with the exception of the particles retained by the 0.5 mm sieve. A minimum pollutant concentration was in the leachate from the 10 and 20 mm particle size fractions.

  10. MATHEMATICAL ENGINEERING TECHNICAL REPORTS

    E-Print Network [OSTI]

    Yamamoto, Hirosuke

    MATHEMATICAL ENGINEERING TECHNICAL REPORTS Modeling of Contagious Credit Events and Risk Analysis holder. #12;Modeling of Contagious Credit Events and Risk Analysis of Credit Portfolios Suguru YAMANAKA This paper presents a new model of the intensities of contagious credit events such as rating changes

  11. RADTRAN 6 technical manual.

    SciTech Connect (OSTI)

    Weiner, Ruth F.; Neuhauser, Karen Sieglinde; Heames, Terence John; O'Donnell, Brandon M.; Dennis, Matthew L.

    2014-01-01T23:59:59.000Z

    This Technical Manual contains descriptions of the calculation models and mathematical and numerical methods used in the RADTRAN 6 computer code for transportation risk and consequence assessment. The RADTRAN 6 code combines user-supplied input data with values from an internal library of physical and radiological data to calculate the expected radiological consequences and risks associated with the transportation of radioactive material. Radiological consequences and risks are estimated with numerical models of exposure pathways, receptor populations, package behavior in accidents, and accident severity and probability.

  12. RESOURCE ASSESSMENT OF THE IN-PLACE AND POTENTIALLY RECOVERABLE DEEP NATURAL GAS RESOURCE OF THE ONSHORE INTERIOR SALT BASINS, NORTH CENTRAL AND NORTHEASTERN GULF OF MEXICO

    SciTech Connect (OSTI)

    Ernest A. Mancini

    2004-04-16T23:59:59.000Z

    The University of Alabama and Louisiana State University have undertaken a cooperative 3-year, advanced subsurface methodology resource assessment project, involving petroleum system identification, characterization and modeling, to facilitate exploration for a potential major source of natural gas that is deeply buried (below 15,000 feet) in the onshore interior salt basins of the North Central and Northeastern Gulf of Mexico areas. The project is designed to assist in the formulation of advanced exploration strategies for funding and maximizing the recovery from deep natural gas domestic resources at reduced costs and risks and with minimum impact. The results of the project should serve to enhance exploration efforts by domestic companies in their search for new petroleum resources, especially those deeply buried (below 15,000 feet) natural gas resources, and should support the domestic industry's endeavor to provide an increase in reliable and affordable supplies of fossil fuels. The principal research effort for Year 1 of the project is data compilation and petroleum system identification. The research focus for the first nine (9) months of Year 1 is on data compilation and for the remainder of the year the emphasis is on petroleum system identification. The objectives of the study are: to perform resource assessment of the in-place deep (>15,000 ft) natural gas resource of the onshore interior salt basins of the North Central and Northeastern Gulf of Mexico areas through petroleum system identification, characterization and modeling and to use the petroleum system based resource assessment to estimate the volume of the in-place deep gas resource that is potentially recoverable and to identify those areas in the interior salt basins with high potential to recover commercial quantities of the deep gas resource. The project objectives will be achieved through a 3-year effort. First, emphasis is on petroleum system identification and characterization in the North Louisiana Salt Basin, the Mississippi Interior Salt Basin, the Manila Sub-basin and the Conecuh Sub-basin of Louisiana, Mississippi, Alabama and Florida panhandle. This task includes identification of the petroleum systems in these basins and the characterization of the overburden, source, reservoir and seal rocks of the petroleum systems and of the associated petroleum traps. Second, emphasis is on petroleum system modeling. This task includes the assessment of the timing of deep (>15,000 ft) gas generation, expulsion, migration, entrapment and alteration (thermal cracking of oil to gas). Third, emphasis is on resource assessment. This task includes the volumetric calculation of the total in-place hydrocarbon resource generated, the determination of the volume of the generated hydrocarbon resource that is classified as deep (>15,000 ft) gas, the estimation of the volume of deep gas that was expelled, migrated and entrapped, and the calculation of the potential volume of gas in deeply buried (>15,000 ft) reservoirs resulting from the process of thermal cracking of liquid hydrocarbons and their transformation to gas in the reservoir. Fourth, emphasis is on identifying those areas in the onshore interior salt basins with high potential to recover commercial quantities of the deep gas resource.

  13. Recoverable Robust Knapsacks: ?-Scenarios

    E-Print Network [OSTI]

    2011-02-24T23:59:59.000Z

    Comparing all test instances, Figure 1 shows the geometric mean resp. maximum gain of recovery ... ning and configuration of 4G multi-hop relay networks.

  14. Technical Guidance

    Broader source: Energy.gov [DOE]

    The Office of Technical Guidance, within the Office of Health, Safety and Security develops and issues Government-wide and Department-wide technical guidance to ensure that classified nuclear...

  15. FLAMMABLE GAS TECHNICAL BASIS DOCUMENT

    SciTech Connect (OSTI)

    KRIPPS, L.J.

    2003-10-09T23:59:59.000Z

    This technical basis document was developed to support of the Tank Farms Documented Safety Analysis (DSA) and describes the risk binning process for the flammable gas representative accidents and associated represented hazardous conditions. The purpose of the risk binning process is to determine the need for safety-significant structures, systems, and components (SSC) and technical safety requirement (TSR)-level controls for a given representative accident or represented hazardous condition based on an evaluation of the event frequency and consequence. Note that the risk binning process is not applied to facility workers, because all facility worker hazardous conditions are considered for safety-significant SSC and/or TSR-level controls.

  16. Organic solvent technical basis document

    SciTech Connect (OSTI)

    SANDGREN, K.R.

    2003-03-22T23:59:59.000Z

    This technical basis document was developed to support the Tank Farms Documented Safety Analysis (DSA), and describes the risk binning process and the technical basis for assigning risk bins for the organic solvent fire representative and associated represented hazardous conditions. The purpose of the risk binning process is to determine the need for safety-significant structures, systems, and components (SSC) and technical safety requirement (TSR)-level controls for a given representative accident or represented hazardous conditions based on an evaluation of the frequency and consequence. Note that the risk binning process is not applied to facility workers, because all facility worker hazardous conditions are considered for safety-significant SSCs and/or TSR-level controls. Determination of the need for safety-class SSCs was performed in accordance with DOE-STD-3009-94, Preparation Guide for US Department of Energy Nonreactor Nuclear Facility Documented Safety Analyses, as described in this report.

  17. Technical basis for the aboveground structure failure and associated represented hazardous conditions

    SciTech Connect (OSTI)

    GOETZ, T.G.

    2003-07-25T23:59:59.000Z

    This technical basis document describes the risk binning process and the technical basis for assigning risk bins for the aboveground structure failure representative accident and associated represented hazardous conditions. This document was developed to support the documented safety analysis.

  18. Report on the US EPA technical workshop on WTI incinerator risk assessment issues. Held in Washington, DC on January 11, 1996

    SciTech Connect (OSTI)

    NONE

    1996-05-01T23:59:59.000Z

    This report presents information and materials from a peer review workshop organized by EPA`s Risk Assessment Forum for Region 5 and the Office of Solid Waste and Emergency Response. The subject of the peer review was a draft document prepared by Region 5 assessing risk at an incinerator operated by Waste Technologies Industries (WTI) in East Liverpool, Ohio. This report summarizes the discussions that took place at the peer review workshop. The report opens with an overview of the workshop and a history of EPA`s WTI incinerator risk assessment activities (section 1), then presents the chairperson`s summary (section 2) and the five work group chairs` summaries (section 3). The body of the report ends with highlights of the peer reviewers` preliminary comments and of the comments offered by workshop observers (section 4).

  19. Technical basis document for natural event hazards

    SciTech Connect (OSTI)

    CARSON, D.M.

    2003-08-28T23:59:59.000Z

    This technical basis document was developed to support the documented safety analysis (DSA) and describes the risk binning process and the technical basis for assigning risk bins for natural event hazard (NEH)-initiated accidents. The purpose of the risk binning process is to determine the need for safety-significant structures, systems, and components (SSC) and technical safety requirement (TSR)-level controls for a given representative accident or represented hazardous conditions based on an evaluation of the frequency and consequence. Note that the risk binning process is not applied to facility workers, because all facility worker hazardous conditions are considered for safety-significant SSCs and/or TSR-level controls This report documents the technical basis for assigning risk bins for Natural Event Hazards Representative Accident and associated represented hazardous conditions.

  20. Resource Assessment of the In-Place and Potentially Recoverable Deep Natural Gas Resource of the Onshore Interior Salt Basins, North Central and Northeastern Gulf of Mexico

    SciTech Connect (OSTI)

    Ernest A. Mancini; Donald A. Goddard

    2004-10-28T23:59:59.000Z

    The objectives of the study are: to perform resource assessment of the in-place deep (>15,000 ft) natural gas resource of the onshore interior salt basins of the North Central and Northeastern Gulf of Mexico areas through petroleum system identification, characterization and modeling and to use the petroleum system based resource assessment to estimate the volume of the in-place deep gas resource that is potentially recoverable and to identify those areas in the interior salt basins with high potential to recover commercial quantities of the deep gas resource. The principal research effort for Year 1 of the project is data compilation and petroleum system identification. The research focus for the first nine (9) months of Year 1 is on data compilation and for the remainder of the year the emphasis is on petroleum system identification.

  1. FLAMMABLE GAS TECHNICAL BASIS DOCUMENT

    SciTech Connect (OSTI)

    KRIPPS, L.J.

    2005-03-03T23:59:59.000Z

    This document describes the qualitative evaluation of frequency and consequences for DST and SST representative flammable gas accidents and associated hazardous conditions without controls. The evaluation indicated that safety-significant structures, systems and components (SSCs) and/or technical safety requirements (TSRs) were required to prevent or mitigate flammable gas accidents. Discussion on the resulting control decisions is included. This technical basis document was developed to support WP-13033, Tank Farms Documented Safety Analysis (DSA), and describes the risk binning process for the flammable gas representative accidents and associated represented hazardous conditions. The purpose of the risk binning process is to determine the need for safety-significant structures, systems, and components (SSC) and technical safety requirement (TSR)-level controls for a given representative accident or represented hazardous condition based on an evaluation of the event frequency and consequence.

  2. Minimizing Project Risk Through Financing Strategies

    E-Print Network [OSTI]

    Michaelson, M.

    One of the major barriers to greater corporate investment in energy conservation, cogeneration and alternative energy projects is the level of risk associated with these investments. Potential risks include technical malfunction of the equipment and...

  3. Risk Informed Assessment of Regulatory and Design Requirements for Future Nuclear Power Plants (Cooperative Agreement DE-FC03-99SF21902, Am. M004) Final Technical Report

    SciTech Connect (OSTI)

    Stanley E. Ritterbusch, et. al.

    2003-01-29T23:59:59.000Z

    OAK-B135 Research under this project addresses the barriers to long term use of nuclear-generated electricity in the United States. It was agreed that a very basic and significant change to the current method of design and regulation was needed. That is, it was believed that the cost reduction goal could not be met by fixing the current system (i.e., an evolutionary approach) and a new, more advanced approach for this project would be needed. It is believed that a completely new design and regulatory process would have to be developed--a ''clean sheet of paper'' approach. This new approach would start with risk-based methods, would establish probabilistic design criteria, and would implement defense-in-depth only when necessary (1) to meet public policy issues (e.g., use of a containment building no matter how low the probability of a large release is) and (2) to address uncertainties in probabilistic methods and equipment performance. This new approach is significantly different from the Nuclear Regulatory Commission's (NRC) current risk-informed program for operating plants. For our new approach, risk-based methods are the primary means for assuring plant safety, whereas in the NRC's current approach, defense-in-depth remains the primary means of assuring safety. The primary accomplishments in the first year--Phase 1 were (1) the establishment of a new, highly risk-informed design and regulatory framework, (2) the establishment of the preliminary version of the new, highly risk-informed design process, (3) core damage frequency predictions showing that, based on new, lower pipe rupture probabilities, the design of the emergency core cooling system equipment can be simplified without reducing plant safety, and (4) the initial development of methods for including uncertainties in a new integrated structures-systems design model. Under the new regulatory framework, options for the use of ''design basis accidents'' were evaluated. It is expected that design basis accidents would be an inherent part of the Probabilistic Safety Assessment for the plant and their evaluation would be probabilistic. Other first year accomplishments include (1) the conversion of an NRC database for cross-referencing NRC criteria and industry codes and standards to Microsoft 2000 software, (2) an assessment of the NRC's hearing process which concluded that the normal cross-examination during public hearings is not actually required by the U.S. Administrative Procedures Act, (3) the identification and listing of reliability data sources, and (4) interfacing with other industry groups (e.g., NEI and IAEA) and NRC at workshops for risk-informing regulations. The major accomplishments during the second year consisted of (1) issuance of the final report for Subtask 1.1, ''Identify Current Applicable Regulatory Requirements [and Industry Standards],'' (2) issuance of the final report for Subtask 1.2,'' Identify Structures, Systems, and Components and Their Associate d Costs for a Typical Plant,'' (3) extension of the new, highly risk-informed design and regulatory framework to non-light-water-reactor technology, (4) completion of more detailed thermal-hydraulic and probabilistic analyses of advanced conceptual reactor system/component designs, (6) initial evaluation and recommendations for improvement of the NRC design review process, and (7) initial development of the software format, procedures and statistical routines needed to store, analyze and retrieve the available reliability data. Final reports for Subtasks 1.1 (regulatory and design criteria) and 1.2 (costs for structures, systems, and components) were prepared and issued. A final report for Subtask 1.3 (Regulatory Framework) was drafted with the aim to issue it in Phase 3 (Year 3). One technical report was produced for Subtask 1.4 (methods development) and two technical reports were produced for Subtask 1.6 (sample problem analysis). An interim report on the NRC design review process (Subtask 1.7) was prepared and issued. Finally, a report on Subtask 2.2 (database weaknesses) addressed the i

  4. A new approach to risk analysis with a focus on organizational risk factors

    E-Print Network [OSTI]

    Marais, Karen, 1973-

    2005-01-01T23:59:59.000Z

    Preventing accidents in complex socio-technical systems requires an approach to risk management that continuously monitors risk and identifies potential areas of concern before they lead to hazards, and constrains hazards ...

  5. TECHNICAL BASIS DOCUMENT FOR NATURAL EVENT HAZARDS

    SciTech Connect (OSTI)

    KRIPPS, L.J.

    2006-07-31T23:59:59.000Z

    This technical basis document was developed to support the documented safety analysis (DSA) and describes the risk binning process and the technical basis for assigning risk bins for natural event hazard (NEH)-initiated accidents. The purpose of the risk binning process is to determine the need for safety-significant structures, systems, and components (SSC) and technical safety requirement (TSR)-level controls for a given representative accident or represented hazardous conditions based on an evaluation of the frequency and consequence. Note that the risk binning process is not applied to facility workers, because all facility worker hazardous conditions are considered for safety-significant SSCs and/or TSR-level controls.

  6. Technical basis document for natural event hazards

    SciTech Connect (OSTI)

    CARSON, D.M.

    2003-03-20T23:59:59.000Z

    This technical basis document was developed to support the Tank Farms Documented Safety Analysis (DSA), and describes the risk binning process and the technical basis for assigning risk bins for natural event hazards (NEH)-initiated representative accident and associated represented hazardous conditions. The purpose of the risk binning process is to determine the need for safety-significant structures, systems, and components (SSC) and technical safety requirement (TSR)-level controls for a given representative accident or represented hazardous conditions based on an evaluation of the frequency and consequence. Note that the risk binning process is not applied to facility workers, because all facility worker hazardous conditions are considered for safety-significant SSCs and/or TSR-level controls. Determination of the need for safety-class SSCs was performed in accordance with DOE-STD-3009-94, ''Preparation Guide for US Department of Energy Nonreactor Nuclear Facility Documented Safety Analyses'', as described in this report.

  7. Air Risk Information Support Center

    SciTech Connect (OSTI)

    Shoaf, C.R.; Guth, D.J. [Environmental Protection Agency, Washington, DC (United States)

    1990-12-31T23:59:59.000Z

    The Air Risk Information Support Center (Air RISC) was initiated in early 1988 by the US Environmental Protection Agency`s (EPA) Office of Health and Environmental Assessment (OHEA) and the Office of Air Quality Planning and Standards (OAQPS) as a technology transfer effort that would focus on providing information to state and local environmental agencies and to EPA Regional Offices in the areas of health, risk, and exposure assessment for toxic air pollutants. Technical information is fostered and disseminated by Air RISCs three primary activities: (1) a {open_quotes}hotline{close_quotes}, (2) quick turn-around technical assistance projects, and (3) general technical guidance projects. 1 ref., 2 figs.

  8. Risk Management Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-09-16T23:59:59.000Z

    This Guide provides a framework for identifying and managing key technical, schedule, and cost risks through applying the requirements of DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, dated 7-28-06. Canceled by DOE G 413.3-7A, dated 1-12-11. Does not cancel other directives.

  9. Technical information

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal StocksProvedFeet)ThousandNumber andCrude StreamCrudeTechnical

  10. Technical Sessions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our InstagramStructureProposedPAGESafety Tag:8,, 20153 To synchronizeTechnical

  11. FLAMMABLE GAS TECHNICAL BASIS DOCUMENT

    SciTech Connect (OSTI)

    KRIPPS, L.J.

    2005-02-18T23:59:59.000Z

    This document describes the qualitative evaluation of frequency and consequences for double shell tank (DST) and single shell tank (SST) representative flammable gas accidents and associated hazardous conditions without controls. The evaluation indicated that safety-significant SSCs and/or TSRS were required to prevent or mitigate flammable gas accidents. Discussion on the resulting control decisions is included. This technical basis document was developed to support of the Tank Farms Documented Safety Analysis (DSA) and describes the risk binning process for the flammable gas representative accidents and associated represented hazardous conditions. The purpose of the risk binning process is to determine the need for safety-significant structures, systems, and components (SSC) and technical safety requirement (TSR)-level controls for a given representative accident or represented hazardous condition based on an evaluation of the event frequency and consequence.

  12. Report: Technical Uncertainty and Risk Reduction

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic2 OPAM615_CostNSAR -Department ofEM Communications AugustSMALLTECHNICAL

  13. Radiation and Chemical Risk Management | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Radiation & Chemical Risk Mgmt. Argonne assists technical problems as diverse as chemically and radiologically contaminated soil, military munitions disposal areas, and groundwater...

  14. Systematic risk analysis: first steps towards

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    implementable. Keywords: Quantitative finance, risk analysis, beta, alpha, trends, technical analysisSystematic risk analysis: first steps towards a new definition of beta Michel FLIESS , Cédric JOIN studies systematic (or market) risks in quantitative finance via the well known coefficient (see, e

  15. Technical Consultant Report Template

    Broader source: Energy.gov [DOE]

    Technical Consultant Report Template, from the Tool Kit Framework: Small Town University Energy Program (STEP).

  16. MIXING OF INCOMPATIBLE MATERIALS IN WASTE TANKS TECHNICAL BASIS DOCUMENT

    SciTech Connect (OSTI)

    SANDGREN, K.R.

    2003-10-15T23:59:59.000Z

    This document presents onsite radiological, onsite toxicological, and offsite toxicological consequences, risk binning, and control decision results for the mixing of incompatible materials in waste tanks representative accident. This technical basis document was developed to support the tank farms documented safety analysis (DSA) and describes the risk binning process, the technical basis for assigning risk bins, and the controls selected for the mixing of incompatible materials representative accident and associated represented hazardous conditions. The purpose of the risk binning process is to determine the need for safety-significant structures, systems, and components (SSC) and/or technical safety requirement (TSR)-level controls for a given representative accident or represented hazardous conditions based on an evaluation of the frequency and consequence. Note that the risk binning process is not applied to facility workers, because all facility worker hazardous conditions are considered for safety-significant SSCs and/or TSR-level controls.

  17. Annex 2 Risk Guidance Science Programme Office Project Management

    E-Print Network [OSTI]

    1 Annex 2 ­ Risk Guidance Science Programme Office Project Management Guidance on Risk Management and technical performance. However, with appropriate procedures, risks can be managed and in so doing, present as bad things happening. The objective of risk management is to identify, assess, reduce, accept

  18. Security Risk Management using Internal Controls Simon Foley,

    E-Print Network [OSTI]

    Foley, Simon

    Security Risk Management using Internal Controls Simon Foley, Department of Computer Science technical concern, it should be considered as just another risk that needs to be managed alongside all other business risks. An Internal Controls approach to security risk management is proposed whereby automated

  19. Annex 2 Risk Management Guidance and Template SPO Project Management

    E-Print Network [OSTI]

    1 Annex 2 ­ Risk Management Guidance and Template SPO Project Management Guidance on Risk Management Introduction Risk is any action or event that affects a project's ability to achieve its on cost, schedule and technical performance. However, with appropriate procedures, risks can be managed

  20. ENVIRONMENTAL HEALTH, SAFETY, AND RISK MANAGEMENT COMPREHENSIVE MANUAL

    E-Print Network [OSTI]

    Shihadeh, Alan

    and healthy environment, to develop and facilitate emergency management best practices, to assist and educateENVIRONMENTAL HEALTH, SAFETY, AND RISK MANAGEMENT COMPREHENSIVE MANUAL Table of Contents Mission Manual Chapter VIII - Radiation Safety Technical Manual Chapter IX - Risk Management Technical Manual

  1. Lger A., Duval C., Weber P., Levrat E., Farret R. "BAYESIAN NETWORK MODELLING THE RISK ANALYSIS OF COMPLEX SOCIO TECHNICAL SYSTEMS". Submitted to: 4th Workshop on Advanced Control and Diagnosis, Nancy -France, 16 et 17 nov., 2006.

    E-Print Network [OSTI]

    Boyer, Edmond

    , Probabilistic risk assessment. 1. INTRODUCTION In classified installations1 (nuclear power plants, chemical impacts on system components ...). In these objectives, this article presents principles of a risk for the environment. 2 Major Accident Reporting System. probability of damage and its gravity. It can also be defined

  2. Technical basis for the aboveground structure failure accident & associated represented hazardous conditions

    SciTech Connect (OSTI)

    GOETZ, T.G.

    2003-05-15T23:59:59.000Z

    This technical basis document describes the risk binning process and the technical basis for assigning risk bins for the above-ground structure failure representative accident and associated represented hazardous conditions. This document was developed to support the documented safety analysis.

  3. Federal Technical Capability Manual

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2004-05-18T23:59:59.000Z

    Provides requirements and responsibilities to ensure recruitment and hiring of technically capable personnel to retain critical technical capabilities within the Department at all times. Cancels DOE M 426.1-1. Canceled by DOE O 426.1.

  4. Technical Fact Sheets

    Broader source: Energy.gov [DOE]

    Technical Fact Sheets (TFS) provide summary-level information on the impact of new, deployed, applied, and/or planned technical approaches supporting EM cleanup projects.  The TFS is presented as a...

  5. Initial Risk Analysis and Decision Making Framework

    SciTech Connect (OSTI)

    Engel, David W.

    2012-02-01T23:59:59.000Z

    Commercialization of new carbon capture simulation initiative (CCSI) technology will include two key elements of risk management, namely, technical risk (will process and plant performance be effective, safe, and reliable) and enterprise risk (can project losses and costs be controlled within the constraints of market demand to maintain profitability and investor confidence). Both of these elements of risk are incorporated into the risk analysis subtask of Task 7. Thus far, this subtask has developed a prototype demonstration tool that quantifies risk based on the expected profitability of expenditures when retrofitting carbon capture technology on a stylized 650 MW pulverized coal electric power generator. The prototype is based on the selection of specific technical and financial factors believed to be important determinants of the expected profitability of carbon capture, subject to uncertainty. The uncertainty surrounding the technical performance and financial variables selected thus far is propagated in a model that calculates the expected profitability of investments in carbon capture and measures risk in terms of variability in expected net returns from these investments. Given the preliminary nature of the results of this prototype, additional work is required to expand the scope of the model to include additional risk factors, additional information on extant and proposed risk factors, the results of a qualitative risk factor elicitation process, and feedback from utilities and other interested parties involved in the carbon capture project. Additional information on proposed distributions of these risk factors will be integrated into a commercial implementation framework for the purpose of a comparative technology investment analysis.

  6. Federal Technical Capability

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2009-11-19T23:59:59.000Z

    This directive defines requirements and responsibilities for meeting the Department of Energy (DOE) commitment to recruiting, deploying, developing, and retaining a technically competent workforce that will accomplish DOE missions in a safe and efficient manner through the Federal Technical Capability Program (FTCP). Cancels DOE M 426.1-1A, Federal Technical Capability Manual.

  7. Technical Standards Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-02-23T23:59:59.000Z

    The Order promotes DOE's use of Voluntary Consensus Standards (VCS) as the primary method for application of technical standards and establishes and manages the DOE Technical Standards Program (TSP) including technical standards development, information, activities, issues, and interactions. Admin Chg 1 dated 3-12-13.

  8. Technical Standards Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-11-19T23:59:59.000Z

    The Technical Standards Program (TSP) promotes the use of voluntary consensus standards by the Department of Energy (DOE), provides DOE with the means to develop needed technical standards, and manages overall technical standards information, activities, issues, and interactions. Cancels DOE O 1300.2A. Canceled by DOE O 252.1A

  9. Technical basis document for the evaporator dump accident

    SciTech Connect (OSTI)

    GOETZ, T.G.

    2003-03-22T23:59:59.000Z

    This technical basis document was developed to support the documented safety analysis (DSA) and describes the risk binning process and the technical basis for assigning risk bins for the evaporator dump representative accident and associated represented hazardous conditions. The purpose of the risk binning process is to determine the need for safety-significant structures, systems, and components (SSC) and/or technical safety requirement (TSR)-level controls for a given representative accident or represented hazardous conditions based on an evaluation of the frequency and consequence. Note that the risk binning process is not applied to facility workers, because all facility worker hazardous conditions are considered for safety-significant SSCs and/or TSR-level controls. Determination of the need for safety-class SSCs was performed in accordance with DOE-STD-3009-94, ''Preparation Guide for US Department of Energy Nonreactor Nuclear Facility Documented Safety Analyses'', as described in this report.

  10. Mixing of incompatible materials in waste tanks technical basis document

    SciTech Connect (OSTI)

    SANDGREN, K.R.

    2003-03-21T23:59:59.000Z

    This technical basis document was developed to support the Tank Farms Documented Safety Analysis (DSA) and describes the risk binning process, the technical basis for assigning risk bins, and the controls selected for the mixing of incompatible materials representative accident and associated represented hazardous conditions. The purpose of the risk binning process is to determine the need for safety-significant structures, systems, and components (SSCs) and/or technical safety requirement (TSR)-level controls for a given representative accident or represented hazardous conditions based on an evaluation of the frequency and consequence. Note that the risk binning process is not applied to facility workers, because all facility worker hazardous conditions are considered for safety-significant SSCs and/or TSR level controls. Determination of the need for safety-class SSCs was performed in accordance with DOE-STD-3009-94, ''Preparation Guide for US Department of Energy Nonreactor Nuclear Facility Documented Safety Analyses'', as described in this report.

  11. Dynamic Evolution for Risk-Neutral Densities

    E-Print Network [OSTI]

    2008-10-27T23:59:59.000Z

    specifications of the data are as follows: the spot asset price is 590, the risk- free interest rate is ... than 10) the recovered risk-neutral densities exhibit less smoothness than in the cases .... Technical report, Purdue University, 1995. [31] A. M. ...

  12. EC Transmission Line Risk Identification and Analysis

    SciTech Connect (OSTI)

    Bigelow, Tim S [ORNL

    2012-04-01T23:59:59.000Z

    The purpose of this document is to assist in evaluating and planning for the cost, schedule, and technical project risks associated with the delivery and operation of the EC (Electron cyclotron) transmission line system. In general, the major risks that are anticipated to be encountered during the project delivery phase associated with the implementation of the Procurement Arrangement for the EC transmission line system are associated with: (1) Undefined or changing requirements (e.g., functional or regulatory requirements) (2) Underperformance of prototype, first unit, or production components during testing (3) Unavailability of qualified vendors for critical components Technical risks associated with the design and operation of the system are also identified.

  13. Technical Talks Timing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    a technical talk is to communicate information to the audience. The Speaker Keep in mind that your objective is communication of information. Mumbling, monotone speech and use...

  14. DOE Technical Assistance Program

    Broader source: Energy.gov (indexed) [DOE]

    Designing Effective Residential Retrofit Programs eere.energy.gov The Parker Ranch installation in Hawaii DOE Technical Assistance Program Quality Assurance for Residential...

  15. The Future of Technical Assistance, Funding and Finding Alternatives

    E-Print Network [OSTI]

    Oliver, R.

    2011-01-01T23:59:59.000Z

    ? Tools ? Local and individual technical support ? Budget analysis for operations and maintenance ? Cost analysis and management ? Financial alternatives ? Grant writing ? Construction and retrofit alternatives ? Back office Putting an energy...The Future of Technical Assistance, Funding and Financing Alternatives Rich Oliver, McKinstry More ?no cost or at risk? assistance in Texas than ever before ? Mentoring by Private Sector ? Education and outreach services ? Documents...

  16. Technical basis document for the release from contaminated facility representative accident and associated represented hazardous conditions

    SciTech Connect (OSTI)

    OBERG, B.D.

    2003-03-22T23:59:59.000Z

    This document supports the Tank Farms Documented Safety Analysis and describes the risk binning process and the technical basis for assigning risk bins for the release from contaminated facility representative accident and associated represented hazardous conditions. The representative accidents qualitatively considered are fires, deflagrations, and load drops in contaminated areas. The risks from a separate evaluation of compressed gas hazards are also summarized.

  17. Federal Technical Capability

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2009-11-19T23:59:59.000Z

    To define requirements and responsibilities for meeting the Department of Energy (DOE) commitment to recruiting, deploying, developing, and retaining a technically competent workforce that will accomplish DOE missions in a safe and efficient manner through the Federal Technical Capability Program (FTCP). Chg. 1 dated 9-20-11 Cancels DOE O 426.1. Cancels DOE P 426.1.

  18. About Technical Assistance

    Broader source: Energy.gov [DOE]

    As technologies proceed along the development pipeline, most face major hurdles as they attempt to enter commercial markets. Our Technical Assistance program helps lower a range of institutional barriers to prepare innovative, energy-efficient technologies and energy management systems for full commercial deployment. These projects and activities address barriers that are not technical, Technology Readiness Level 9.

  19. Technical Report Computer Laboratory

    E-Print Network [OSTI]

    Haddadi, Hamed

    the opportunity to consider a physical attack, with very little to lose. We thus set out to analyse the deviceTechnical Report Number 592 Computer Laboratory UCAM-CL-TR-592 ISSN 1476-2986 Unwrapping J. Murdoch Technical reports published by the University of Cambridge Computer Laboratory are freely

  20. Federal Technical Capability Manual

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-06-05T23:59:59.000Z

    The Federal Technical Capability Manual provides the process for the recruitment, deployment, development, and retention of Federal personnel with the demonstrated technical capability to safely accomplish the Departments missions and responsibilities at defense nuclear facilities. Canceled by DOE M 426.1-1A. Does not cancel other directives.

  1. Depleted Uranium Technical Brief

    E-Print Network [OSTI]

    Depleted Uranium Technical Brief United States Environmental Protection Agency Office of Air and Radiation Washington, DC 20460 EPA-402-R-06-011 December 2006 #12;#12;Depleted Uranium Technical Brief EPA of Radiation and Indoor Air Radiation Protection Division ii #12;iii #12;FOREWARD The Depleted Uranium

  2. MATHEMATICAL ENGINEERING TECHNICAL REPORTS

    E-Print Network [OSTI]

    Yamamoto, Hirosuke

    MATHEMATICAL ENGINEERING TECHNICAL REPORTS A Subband Coding Approach to Control under Limited Data Rates and Message Losses Hideaki ISHII and Shinji HARA (Communicated by Kazuo Murota) METR 2006­22 April METR technical reports are published as a means to ensure timely dissemination of scholarly

  3. Quantifying and managing the risk of information security breaches participants in a supply chain

    E-Print Network [OSTI]

    Bellefeuille, Cynthia Lynn

    2005-01-01T23:59:59.000Z

    Technical integration between companies can result in an increased risk of information security breaches. This thesis proposes a methodology for quantifying information security risk to a supply chain participant. Given a ...

  4. MELCOR technical assessment at SNL

    SciTech Connect (OSTI)

    Kmetyk, L.N.; Tautges, T.J.

    1993-12-01T23:59:59.000Z

    MELCOR is a fully integrated, engineering-level computer code that models the progression of severe accidents in light water reactor (LWR) nuclear power plants, which is being developed at Sandia National Laboratories for the US Nuclear Regulatory Commission (US-NRC). The entire spectrum of severe accident phenomena, including reactor coolant system and containment thermal/hydraulic response, core heatup, degradation and relocation, and fission product release and transport, is treated in MELCOR in a unified framework for both boiling water reactors (PRWs). The MELCOR computer code has been developed to the point that is now being successfully applied in severe accident analyses, particularly in probabilistic risk assessment (PRA) studies. MELCOR was the first of the severe accident analysis code to undergo a formal peer review process. One of the major conclusions of the recent MELCOR Peer Review was the need for a more comprehensive and more systematic program of MELCOR assessment. This report provides a discussion of this technical assessment.

  5. Lessons Learned in Risk Management on NCSX

    SciTech Connect (OSTI)

    G.H. Neilson, C.O. Gruber, J.H. Harris, D.J. Rej, R.T. Simmons, and R.L. Strykowsky

    2009-02-11T23:59:59.000Z

    The National Compact Stellarator Experiment (NCSX) was designed to test physics principles of an innovative stellarator design developed by the Princeton Plasma Physics Laboratory and Oak Ridge National Laboratory. Construction of some of the major components and sub-assemblies was completed, but the estimated cost and schedule for completing the project grew as the technical requirements and risks became better understood, leading to its cancellation in 2008. The project's risks stemmed from its technical challenges, primarily the complex component geometries and tight tolerances that were required. The initial baseline, established in 2004, was supported by a risk management plan and risk-based contingencies, both of which proved to be inadequate. Technical successes were achieved in the construction of challenging components and subassemblies, but cost and schedule growth was experienced. As part of an effort to improve project performance, a new risk management program was devised and implemented in 2007-08. It led to a better understanding of project risks, a sounder basis for contingency estimates, and improved management tools. Although the risks ultimately were unacceptable to the sponsor, valuable lessons in risk management were learned through the experiences with the NCSX project.

  6. Lessons Learned in Risk Management on NCSX

    SciTech Connect (OSTI)

    Neilson, G. H.; Gruber, C. O.; Harris, J. H.; Rej, D. J.; Simmons, R. T.; Strykowsky, R. L.

    2009-07-21T23:59:59.000Z

    The National Compact Stellarator Experiment (NCSX) was designed to test physics principles of an innovative stellarator design developed by the Princeton Plasma Physics Laboratory and Oak Ridge National Laboratory. Construction of some of the major components and sub-assemblies was completed, but the estimated cost and schedule for completing the project grew as the technical requirements and risks became better understood, leading to its cancellation in 2008. The project's risks stemmed from its technical challenges, primarily the complex component geometries and tight tolerances that were required. The initial baseline, established in 2004, was supported by a risk management plan and risk-based contingencies, both of which proved to be inadequate. Technical successes were achieved in the construction of challenging components and subassemblies, but cost and schedule growth was experienced. As part of an effort to improve project performance, a new risk management program was devised and implemented in 2007-08. It led to a better understanding of project risks, a sounder basis for contingency estimates, and improved management tools. Although the risks ultimately were unacceptable to the sponsor, valuable lessons in risk management were learned through the experiences with the NCSX project.

  7. Active Technical Standards Managers List

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    TECHNICAL STANDARDS PROGRAM ASSIGNMENT TELEPHONEFAXEMAIL NAME DOE FACILITYADDRESS LOC CODE AU-30 Jeff D. Feit DOE Technical Standards Program, Manager U.S. Department of Energy...

  8. ?-Fe{sub 2}O{sub 3} nanoparticles: An easily recoverable effective photo-catalyst for the degradation of rose bengal and methylene blue dyes in the waste-water treatment plant

    SciTech Connect (OSTI)

    Dutta, Amit Kumar; Maji, Swarup Kumar; Adhikary, Bibhutosh, E-mail: bibhutoshadhikary@yahoo.in

    2014-01-01T23:59:59.000Z

    Graphical abstract: - Highlights: • ?-Fe{sub 2}O{sub 3} NPs from a single-source precursor and characterized by XRD, TEM, UV–vis spectra. • The NPs were tested as effective photocatalyst toward degradation of RB and MB dyes. • The possible pathway of the photocatalytic decomposition process has been discussed. • The active species, OH·, was detected by TA photoluminescence probing techniques. - Abstract: ?-Fe{sub 2}O{sub 3} nanoparticles (NPs) were synthesized from a single-source precursor complex [Fe{sub 3}O(C{sub 6}H{sub 5}COO){sub 6}(H{sub 2}O){sub 3}]NO{sub 3} by a simple thermal decomposition process and have been characterized by X-ray diffraction analysis (XRD), transmission electron microscopy (TEM) and UV–vis spectroscopic techniques. The NPs were highly pure and well crystallized having hexagonal morphology with an average particle size of 35 nm. The prepared ?-Fe{sub 2}O{sub 3} (maghemite) NPs show effective photo-catalytic activity toward the degradation of rose bengal (RB) and methylene blue (MB) dyes under visible light irradiation and can easily be recoverable in the presence of magnetic field for successive re-uses. The possible photo-catalytic decomposition mechanism is discussed through the detection of hydroxyl radical (OH·) by terephthalic acid photo-luminescence probing technique.

  9. Technical Foundations of the Agent Contest 2008

    E-Print Network [OSTI]

    Zachmann, Gabriel

    (Technical Computer Science) Prof. Dr. Gabriel Zachmann (Computer Graphics) #12;Technical Foundations

  10. Technical Standards, Style Guide- August 1, 2000

    Broader source: Energy.gov [DOE]

    Style Guide for the Preparation of DOE Technical Standards (Standards, Handbooks, and Technical Standards Lists)

  11. Integrated risk information system (IRIS)

    SciTech Connect (OSTI)

    Tuxen, L. [Environmental Protection Agency, Washington, DC (United States)

    1990-12-31T23:59:59.000Z

    The Integrated Risk Information System (IRIS) is an electronic information system developed by the US Environmental Protection Agency (EPA) containing information related to health risk assessment. IRIS is the Agency`s primary vehicle for communication of chronic health hazard information that represents Agency consensus following comprehensive review by intra-Agency work groups. The original purpose for developing IRIS was to provide guidance to EPA personnel in making risk management decisions. This original purpose for developing IRIS was to guidance to EPA personnel in making risk management decisions. This role has expanded and evolved with wider access and use of the system. IRIS contains chemical-specific information in summary format for approximately 500 chemicals. IRIS is available to the general public on the National Library of Medicine`s Toxicology Data Network (TOXNET) and on diskettes through the National Technical Information Service (NTIS).

  12. Status Updates on the Performance and Risk Assessment Community...

    Broader source: Energy.gov (indexed) [DOE]

    NV December 11-12, 2014 To view all the P&RA CoP 2014 Technical Exchange Meeting videos click here. Video Presentation Status Updates on the Performance and Risk Assessment...

  13. Risk Analysis and Decision-Making Under Uncertainty: A Strategy...

    Office of Environmental Management (EM)

    Estimation Since 2002 To view all the P&RA CoP 2014 Technical Exchange Meeting videos click here. Video Presentation - Part 1 Video Presentation - Part 2 Risk Analysis and...

  14. Dynamical systems probabilistic risk assessment.

    SciTech Connect (OSTI)

    Denman, Matthew R.; Ames, Arlo Leroy

    2014-03-01T23:59:59.000Z

    Probabilistic Risk Assessment (PRA) is the primary tool used to risk-inform nuclear power regulatory and licensing activities. Risk-informed regulations are intended to reduce inherent conservatism in regulatory metrics (e.g., allowable operating conditions and technical specifications) which are built into the regulatory framework by quantifying both the total risk profile as well as the change in the risk profile caused by an event or action (e.g., in-service inspection procedures or power uprates). Dynamical Systems (DS) analysis has been used to understand unintended time-dependent feedbacks in both industrial and organizational settings. In dynamical systems analysis, feedback loops can be characterized and studied as a function of time to describe the changes to the reliability of plant Structures, Systems and Components (SSCs). While DS has been used in many subject areas, some even within the PRA community, it has not been applied toward creating long-time horizon, dynamic PRAs (with time scales ranging between days and decades depending upon the analysis). Understanding slowly developing dynamic effects, such as wear-out, on SSC reliabilities may be instrumental in ensuring a safely and reliably operating nuclear fleet. Improving the estimation of a plant's continuously changing risk profile will allow for more meaningful risk insights, greater stakeholder confidence in risk insights, and increased operational flexibility.

  15. Technical Planning Basis

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-07-11T23:59:59.000Z

    The Guide assists DOE/NNSA field elements and operating contractors in identifying and analyzing hazards at facilities and sites to provide the technical planning basis for emergency management programs. Cancels DOE G 151.1-1, Volume 2.

  16. Technical Standards Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-02-23T23:59:59.000Z

    The order establishes the DOE Technical Standards Program. Cancels DOE O 252.1 and DOE G 252.1-1. Admin Chg 1, dated 3-12-13 cancels DOE O 252.1A.

  17. OSH technical reference manual

    SciTech Connect (OSTI)

    Not Available

    1993-11-01T23:59:59.000Z

    In an evaluation of the Department of Energy (DOE) Occupational Safety and Health programs for government-owned contractor-operated (GOCO) activities, the Department of Labor`s Occupational Safety and Health Administration (OSHA) recommended a technical information exchange program. The intent was to share written safety and health programs, plans, training manuals, and materials within the entire DOE community. The OSH Technical Reference (OTR) helps support the secretary`s response to the OSHA finding by providing a one-stop resource and referral for technical information that relates to safe operations and practice. It also serves as a technical information exchange tool to reference DOE-wide materials pertinent to specific safety topics and, with some modification, as a training aid. The OTR bridges the gap between general safety documents and very specific requirements documents. It is tailored to the DOE community and incorporates DOE field experience.

  18. DOE Technical Assistance Program

    Broader source: Energy.gov (indexed) [DOE]

    Solid-State Solutions for Municipal Lighting: What You'll Need to Know eere.energy.gov The Parker Ranch installation in Hawaii DOE Technical Assistance Program Solid-State...

  19. TECHNICAL BASIS FOR THE NUCLEAR CRITICALITY REPRESENTATIVE ACCIDENT & ASSOCIATED REPRESENTED HAZARDOUS CONDITIONS

    SciTech Connect (OSTI)

    GOETZ, T.G.

    2003-06-17T23:59:59.000Z

    This document was developed to support the documented safety analysis (DSA) and describes the process and basis for assigning risk bins for the nuclear criticality representative accident and associated hazardous conditions. Revision 1 incorporates ORP IRT comments to enhance the technical presentation and also makes editorial changes. This technical basis document was developed to support the documented safety analysis (DSA), and describes the risk binning process and the technical basis for assigning risk bins for the nuclear criticality representative accident and associated hazardous conditions. The purpose of the risk binning process is to determine the need for safety-significant structures, systems, and components (SSC) and technical safety requirement (TSR)-level controls for a given representative accident or represented hazardous condition based on an evaluation of the frequency and consequence.

  20. TECHNICAL BASIS FOR THE NUCLEAR CRITICALITY REPRESENTATIVE ACCIDENT & ASSOCIATED REPRESENTED HAZARDOUS CONDITIONS

    SciTech Connect (OSTI)

    GRIGSBY, J.M.

    2005-03-03T23:59:59.000Z

    Technical Basis Document for the Nuclear Criticality Representative Accident and Associate Represented Hazardous Conditions. Revision 2 of RPP-12371 provides accident consequence estimates for a hypothetical criticality event in an above grade facility (e.g. DBVS, CH-TRUM, and S-109 PWRS). This technical basis document was developed to support RPP-13033, ''Tank Farms Documented Safety Analysis (DSA)'', and describes the risk binning process and the technical basis for assigning risk bins for the nuclear criticality representative accident and associated hazardous conditions. The purpose of the risk binning process is to determine the need for safety-significant structures, systems, and components (SSC) and technical safety requirement (TSR)-level controls for a given representative accident or represented hazardous condition based on an evaluation of the frequency and consequence. Note that the risk binning process is not applied to facility workers, because all facility worker hazardous conditions are considered for safety-significant SSCs and/or TSR-level controls.

  1. GENERAL TECHNICAL REPORT PSW-GTR-245 Management Adaptation to Fires in the

    E-Print Network [OSTI]

    Standiford, Richard B.

    GENERAL TECHNICAL REPORT PSW-GTR-245 357 Management Adaptation to Fires in the Wildland-Urban Risk result in major socio-economic losses and in the worst cases loss of human life. Specifically Institute). #12;GENERAL TECHNICAL REPORT PSW-GTR-245 358 Its configuration has occurred coincidently

  2. Assessing Risk and Driving Risk Mitigation for First-of-a-Kind Advanced Reactors

    SciTech Connect (OSTI)

    John W. Collins

    2011-09-01T23:59:59.000Z

    Planning and decision making amidst programmatic and technological risks represent significant challenges for projects. This presentation addresses the four step risk-assessment process needed to determine clear path forward to mature needed technology and design, license, and construct advanced nuclear power plants, which have never been built before, including Small Modular Reactors. This four step process has been carefully applied to the Next Generation Nuclear Plant. STEP 1 - Risk Identification Risks are identified, collected, and categorized as technical risks, programmatic risks, and project risks, each of which result in cost and schedule impacts if realized. These include risks arising from the use of technologies not previously demonstrated in a relevant application. These risks include normal and accident scenarios which the SMR could experience including events that cause the disablement of engineered safety features (typically documented in Phenomena Identification Ranking Tables (PIRT) as produced with the Nuclear Regulatory Commission) and design needs which must be addressed to further detail the design. Product - Project Risk Register contained in a database with sorting, presentation, rollup, risk work off functionality similar to the NGNP Risk Management System . STEP 2 - Risk Quantification The risks contained in the risk register are then scored for probability of occurrence and severity of consequence, if realized. Here the scoring methodology is established and the basis for the scoring is well documented. Product - Quantified project risk register with documented basis for scoring. STEP 3 - Risk Handling Strategy Risks are mitigated by applying a systematic approach to maturing the technology through Research and Development, modeling, test, and design. A Technology Readiness Assessment is performed to determine baseline Technology Readiness Levels (TRL). Tasks needed to mature the technology are developed and documented in a roadmap. Product - Risk Handling Strategy. STEP 4 - Residual Risk Work off The risk handling strategy is entered into the Project Risk Allocation Tool (PRAT) to analyze each task for its ability to reduce risk. The result is risk-informed task prioritization. The risk handling strategy is captured in the Risk Management System, a relational database that provides conventional database utility, including data maintenance, archiving, configuration control, and query ability. The tool's Hierarchy Tree allows visualization and analyses of complex relationships between risks, risk mitigation tasks, design needs, and PIRTs. Product - Project Risk Allocation Tool and Risk Management System which depict project plan to reduce risk and current progress in doing so.

  3. Cold Vacuum Drying (CVD) Facility Technical Safety Requirements

    SciTech Connect (OSTI)

    KRAHN, D.E.

    1999-12-16T23:59:59.000Z

    The Technical Safety Requirements (TSRs) for the Cold Vacuum Drying Facility define acceptable conditions, safe boundaries, bases thereof, and management or administrative controls required to ensure safe operation. Controls required for public safety, significant defense-in-depth, significant worker safety, and for maintaining radiological and toxicological consequences below risk evaluation guidelines are included.

  4. Technical Assistance to Developers

    SciTech Connect (OSTI)

    Rockward, Tommy [Los Alamos National Laboratory; Borup, Rodney L. [Los Alamos National Laboratory; Garzon, Fernando H. [Los Alamos National Laboratory; Mukundan, Rangachary [Los Alamos National Laboratory; Spernjak, Dusan [Los Alamos National Laboratory

    2012-07-17T23:59:59.000Z

    This task supports the allowance of technical assistance to fuel-cell component and system developers as directed by the DOE. This task includes testing of novel materials and participation in the further development and validation of single cell test protocols. This task also covers technical assistance to DOE Working Groups, the U.S. Council for Automotive Research (USCAR) and the USCAR/DOE Driving Research and Innovation for Vehicle efficiency and Energy sustainability (U.S. Drive) Fuel Cell Technology Team. Assistance includes technical validation of new fuel cell materials and methods, single cell fuel cell testing to support the development of targets and test protocols, and regular advisory participation in other working groups and reviews. This assistance is made available to PEM fuel cell developers by request and DOE Approval. The objectives are to: (1) Support technically, as directed by DOE, fuel cell component and system developers; (2) Assess fuel cell materials and components and give feedback to developers; (3) Assist the DOE Durability Working Group with the development of various new material durability Testing protocols; and (4) Provide support to the U.S. Council for Automotive Research (USCAR) and the USCAR/DOE Fuel Cell Technology Team. FY2012 specific technical objectives are: (1) Evaluate novel MPL materials; (2) Develop of startup/ shutdown protocol; (3) Test the impact of hydrophobic treatment on graphite bi-polar plates; (4) Perform complete diagnostics on metal bi-polar plates for corrosion; and (5) Participate and lead efforts in the DOE Working Groups.

  5. RAMS (Risk Analysis - Modular System) methodology

    SciTech Connect (OSTI)

    Stenner, R.D.; Strenge, D.L.; Buck, J.W. [and others

    1996-10-01T23:59:59.000Z

    The Risk Analysis - Modular System (RAMS) was developed to serve as a broad scope risk analysis tool for the Risk Assessment of the Hanford Mission (RAHM) studies. The RAHM element provides risk analysis support for Hanford Strategic Analysis and Mission Planning activities. The RAHM also provides risk analysis support for the Hanford 10-Year Plan development activities. The RAMS tool draws from a collection of specifically designed databases and modular risk analysis methodologies and models. RAMS is a flexible modular system that can be focused on targeted risk analysis needs. It is specifically designed to address risks associated with overall strategy, technical alternative, and `what if` questions regarding the Hanford cleanup mission. RAMS is set up to address both near-term and long-term risk issues. Consistency is very important for any comparative risk analysis, and RAMS is designed to efficiently and consistently compare risks and produce risk reduction estimates. There is a wide range of output information that can be generated by RAMS. These outputs can be detailed by individual contaminants, waste forms, transport pathways, exposure scenarios, individuals, populations, etc. However, they can also be in rolled-up form to support high-level strategy decisions.

  6. Enterprise Risk Management Program

    E-Print Network [OSTI]

    Hayden, Nancy J.

    Enterprise Risk Management Program DRAFT Introduction to Enterprise Risk Management at UVM 1 #12;Enterprise Risk Management Program DRAFT What is Enterprise Risk Management? Enterprise risk management governance, and accountability · Facilitates effective management of the uncertainty and associated risks

  7. Risk Assessment Risk communication 1997

    E-Print Network [OSTI]

    Hung, Shih-Hao

    · 1 1997 2003 WHO #12;6060 NTU Alumni Bimonthly No.87 Fault tree Event tree [2] Nuclear reactor of nuclear power plants. Reliability Engineering and Safety System, 52:297-314. [4] Jonas Hagmann. 2012. Fukushima: probing the analytical and epistemological limits of risk analysis. Journal of Risk Research. 15

  8. Climate Vison: Resources and Links - Technical Information

    Office of Scientific and Technical Information (OSTI)

    Technical Information Publications Case Studies Publications DOE BestPractices Technical Publications The DOE BestPractices team offers a broad selection of technical publications...

  9. Technical Consultant RFP | Department of Energy

    Energy Savers [EERE]

    RFP Technical Consultant RFP Technical Consultant RFP, from the Tool Kit Framework: Small Town University Energy Program (STEP). C3b Technical Consultant RFP.pdf More Documents &...

  10. h~EPA Risk Assessments Methodology

    E-Print Network [OSTI]

    Impact Statement (EIS) has been prepared in support of the rulemaking. The EIS consists of the following levels, the benefits and costs of emission controls, and economic impact evaluations. Copies of the EIS significant technical support in the preparation of the EIS, #12;TABLE OF CONTENTS VOLLIYlE I: RISK ASSESSMENT

  11. Market Based Risk Mitigation: Risk Management vs. Risk Avoidance

    E-Print Network [OSTI]

    Market Based Risk Mitigation: Risk Management vs. Risk Avoidance Shmuel Oren University of the critical infrastructures in our society. Risk assessment and systematic consideration of risk in the design knowledge for engineers, like physics for instance, consideration of risk has penetrated all engineering

  12. Technical Report Computer Laboratory

    E-Print Network [OSTI]

    Haddadi, Hamed

    for criminal activity. One general attack route to breach the security is to carry out physical attack afterTechnical Report Number 829 Computer Laboratory UCAM-CL-TR-829 ISSN 1476-2986 Microelectronic report is based on a dissertation submitted January 2009 by the author for the degree of Doctor

  13. RELEASE OF DRIED RADIOACTIVE WASTE MATERIALS TECHNICAL BASIS DOCUMENT

    SciTech Connect (OSTI)

    KOZLOWSKI, S.D.

    2007-05-30T23:59:59.000Z

    This technical basis document was developed to support RPP-23429, Preliminary Documented Safety Analysis for the Demonstration Bulk Vitrification System (PDSA) and RPP-23479, Preliminary Documented Safety Analysis for the Contact-Handled Transuranic Mixed (CH-TRUM) Waste Facility. The main document describes the risk binning process and the technical basis for assigning risk bins to the representative accidents involving the release of dried radioactive waste materials from the Demonstration Bulk Vitrification System (DBVS) and to the associated represented hazardous conditions. Appendices D through F provide the technical basis for assigning risk bins to the representative dried waste release accident and associated represented hazardous conditions for the Contact-Handled Transuranic Mixed (CH-TRUM) Waste Packaging Unit (WPU). The risk binning process uses an evaluation of the frequency and consequence of a given representative accident or represented hazardous condition to determine the need for safety structures, systems, and components (SSC) and technical safety requirement (TSR)-level controls. A representative accident or a represented hazardous condition is assigned to a risk bin based on the potential radiological and toxicological consequences to the public and the collocated worker. Note that the risk binning process is not applied to facility workers because credible hazardous conditions with the potential for significant facility worker consequences are considered for safety-significant SSCs and/or TSR-level controls regardless of their estimated frequency. The controls for protection of the facility workers are described in RPP-23429 and RPP-23479. Determination of the need for safety-class SSCs was performed in accordance with DOE-STD-3009-94, Preparation Guide for US. Department of Energy Nonreactor Nuclear Facility Documented Safety Analyses, as described below.

  14. TECHNICAL STANDARDS PROGRAM TOPICAL COMMITTEES

    Broader source: Energy.gov [DOE]

    PurposeThis procedure describes how topical committees are organized and recognized under the Technical Standards Program. 

  15. NGNP Risk Management through Assessing Technology Readiness

    SciTech Connect (OSTI)

    John W. Collins

    2010-08-01T23:59:59.000Z

    Throughout the Next Generation Nuclear Plant (NGNP) project life cycle, technical risks are identified, analyzed, and mitigated and decisions are made regarding the design and selection of plant and sub-system configurations, components and their fabrication materials, and operating conditions. Risk resolution and decision making are key elements that help achieve project completion within budget and schedule constraints and desired plant availability. To achieve this objective, a formal decision-making and risk management process was developed for NGNP, based on proven systems engineering principles that have guided aerospace and military applications.

  16. Monotonicity of quantum relative entropy and recoverability

    E-Print Network [OSTI]

    Mario Berta; Marius Lemm; Mark M. Wilde

    2014-12-18T23:59:59.000Z

    The relative entropy is a principal measure of distinguishability in quantum information theory, with its most important property being that it is non-increasing under noisy quantum operations. Here, we establish a remainder term for this inequality that quantifies how well one can recover from a loss of information by employing a rotated Petz recovery map. The main approach for proving this refinement is to combine the methods of [Fawzi and Renner, arXiv:1410.0664] with the notion of a relative typical subspace from [Bjelakovic and Siegmund-Schultze, arXiv:quant-ph/0307170]. It remains an open question if the same bound holds for the Petz recovery map (and not merely for a rotated Petz recovery map). A well known result states that the monotonicity of relative entropy under quantum operations is equivalent to any of the following inequalities: strong subadditivity of entropy, concavity of conditional entropy, joint convexity of relative entropy, and monotonicity of relative entropy under partial trace. We show that this equivalence holds true for refinements of all these inequalities in terms of the Petz recovery map. So either all of these refinements are true or all are false.

  17. Recoverable Robust Knapsacks: the Discrete Scenario Case

    E-Print Network [OSTI]

    kutschka

    Admission control problems have been studied extensively in the past. ... In case of slight deviations the customer still expects the promised quality of service. ... The objective is to select a subset X of these items such that the total profit of X is.

  18. The recoverable robust tail assignment problem

    E-Print Network [OSTI]

    2012-12-17T23:59:59.000Z

    In August 2011 the on-time performance of the airline industry of Australia ... robustness into the aircraft routing problem is via key performance indicators, ...

  19. Periodic Comet Recoverers James V. Scotti

    E-Print Network [OSTI]

    Scotti, Jim

    . . . . . . . . . . . . . . . . . . . . . . . . . 14 3.10 Tom Gehrels . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 3.11 James B. Gibson . . . . . . . . . . . . . . . . . . . . . . . 18 3.19 Stephen M. Larson . . . . . . . . . . . . . . . . . . . . . . . . 18 3.20 Robert H. Mc

  20. Business Case for Technical Qualification Program Accreditation...

    Broader source: Energy.gov (indexed) [DOE]

    Business Case for Technical Qualification Program Accreditation Incentives Business Case for Technical Qualification Program Accreditation Incentives TQP Accreditation standardize...

  1. Characterization, Coordination, and Legitimization of Risk in Cross-Disciplinary Situations

    E-Print Network [OSTI]

    Andreas, Dorothy Collins

    2011-10-21T23:59:59.000Z

    , & Read, 1994; Fischoff, 1995; McComas, 2006; Plough & Krimsky, 1987; Renn, 1998; Slovic, 1999; Uggla, 2008). This literature review focuses on three main processes regarding risk communication among experts: how they characterize risk, how... paradigm to describe how people use different cognitive frames to arrive at their risk judgments. Plough and Krimsky (1987) characterized risk communication as an interaction between people with ?technical? and ?cultural? ways of understanding risk...

  2. Technical basis document for the steam intrusion from interfacing systems accident

    SciTech Connect (OSTI)

    GOETZ, T.G.

    2003-03-21T23:59:59.000Z

    This technical basis document was developed to support the Documented Safety Analysis (DSA) and describes the risk binning process and the technical basis for assigning risk bins for the steam intrusion from interfacing systems representative accident and associated represented hazardous conditions. The purpose of the risk binning process is to determine the need for safety-significant structures, systems, and components (SSC) and technical safety requirement (TSR)-level controls for a given representative accident or represented hazardous conditions based on an evaluation of the frequency and consequence. Note that the risk binning process is not applied to facility workers, because all facility worker hazardous conditions are considered for safety-significant SSCs and/or TSR-level controls. Determination of the need for safety-class SSCs was performed in accordance with DOE-STD-3009-94, ''Preparation Guide for US Department of Energy Nonreactor Nuclear Facility Documented Safety Analyses'', as described in this report.

  3. Technical basis for the nuclear criticality representative accident and associated represented hazardous conditions

    SciTech Connect (OSTI)

    CARSON, D.M.

    2003-03-20T23:59:59.000Z

    This technical basis document was developed to support the Tank Farms Documented Safety Analysis (DSA), and describes the risk binning process and the technical basis for assigning risk bins for the nuclear criticality representative accident and associated hazardous conditions. The purpose of the risk binning process is to determine the need for safety-significant structures, systems, and components (SSC) and technical safety requirement (TSR)-level controls for a given representative accident or represented hazardous condition based on an evaluation of the frequency and consequence. Note that the risk binning process is not applied to facility workers, because all facility worker hazardous conditions are considered for safety-significant SSCs and/or TSR-level controls. Determination of the need for safety-class SSCs was performed in accordance with DOE-STD-3009-94, ''Preparation Guide for US Department of Energy Nonreactor Nuclear Facility Documented Safety Analyses'', as described in this report.

  4. Technical basis for the tank bump representative accident and associated hazardous conditions

    SciTech Connect (OSTI)

    WILLIAMS, J.C.

    2003-03-21T23:59:59.000Z

    This technical basis document was developed to support the Tank Farms Documented Safety Analysis (DSA) and describes the risk binning process and the technical basis for assigning risk bins for the tank bump representative accident and associated hazardous conditions. The purpose of the risk binning process is to determine the need for safety-significant structures, systems, and components (SSC) and/or technical safety requirement (TSR)-level controls for a given representative accident or represented hazardous conditions based on an evaluation of the frequency and consequence. Note that the risk binning process is not applied to facility workers, because all facility worker hazardous conditions are considered for safety-significant SSCs and/or TSR-level controls. Determination of the need for safety-class SSCs was performed in accordance with DOE-STD-3009-94, ''Preparation Guide for US Department of Energy Nonreactor Nuclear Facility Safety Analysis Reports'', as described in this report.

  5. Final Technical Report

    SciTech Connect (OSTI)

    Maxwell, Mike, J., P.E.

    2012-08-30T23:59:59.000Z

    The STI product is the Final Technical Report from ReliOn, Inc. for contract award DE-EE0000487: Recovery Act PEM Fuel Cell Systems Providing Emergency Reserve and Backup Power. The program covered the turnkey deployment of 431 ReliOn fuel cell systems at 189 individual sites for AT&T and PG&E with ReliOn functioning as the primary equipment supplier and the project manager. The Final Technical Report provides an executive level summary, a comparison of the actual accomplishments vs. the goals and objectives of the project, as well as a summary of the project activity from the contract award date of August 1, 2009 through the contract expiration date of December 31, 2011. Two photos are included in the body of the report which show hydrogen storage and bulk hydrogen refueling technologies developed as a result of this program.

  6. Honda Transmission Technical Center

    High Performance Buildings Database

    Russells Point, OH The Honda Transmission Technical Center is located on the Honda of America Manufacturing Plant facility site in Russells Point, Ohio. This facility is used for product engineering and market quality testing and analysis of automatic transmissions. The building contains a large workshop area for ten cars, a future dynamometer, two laboratories, an open office area, three conference rooms, a break room, restrooms, and related support areas.

  7. Technical Surveillance Countermeasures Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1993-06-18T23:59:59.000Z

    To prescribe policies, responsibilities and authorities to establish Department of Energy (DOE) Technical Surveillance Countermeasures (TSCM) Program. This order implements the DOE TSCM Procedural Guide, DOE TSCM Operations Manual, DOE TSCM Report Writing Guide and Threat Assessment Scheduling System (TASS) which contain classified policies and procedures concerning the DOE TSCM Program. Cancels DOE 5636.3A. Canceled by DOE O 471.2 dated 9-28-95.

  8. Technical approach document

    SciTech Connect (OSTI)

    Not Available

    1989-12-01T23:59:59.000Z

    The Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law 95-604 (PL95-604), grants the Secretary of Energy the authority and responsibility to perform such actions as are necessary to minimize radiation health hazards and other environmental hazards caused by inactive uranium mill sites. This Technical Approach Document (TAD) describes the general technical approaches and design criteria adopted by the US Department of Energy (DOE) in order to implement remedial action plans (RAPS) and final designs that comply with EPA standards. It does not address the technical approaches necessary for aquifer restoration at processing sites; a guidance document, currently in preparation, will describe aquifer restoration concerns and technical protocols. This document is a second revision to the original document issued in May 1986; the revision has been made in response to changes to the groundwater standards of 40 CFR 192, Subparts A--C, proposed by EPA as draft standards. New sections were added to define the design approaches and designs necessary to comply with the groundwater standards. These new sections are in addition to changes made throughout the document to reflect current procedures, especially in cover design, water resources protection, and alternate site selection; only minor revisions were made to some of the sections. Sections 3.0 is a new section defining the approach taken in the design of disposal cells; Section 4.0 has been revised to include design of vegetated covers; Section 8.0 discusses design approaches necessary for compliance with the groundwater standards; and Section 9.0 is a new section dealing with nonradiological hazardous constituents. 203 refs., 18 figs., 26 tabs.

  9. Hanford waste vitrification systems risk assessment

    SciTech Connect (OSTI)

    Miller, W.C.; Hamilton, D.W.; Holton, L.K.; Bailey, J.W.

    1991-09-01T23:59:59.000Z

    A systematic Risk Assessment was performed to identify the technical, regulatory, and programmatic uncertainties and to quantify the risks to the Hanford Site double-shell tank waste vitrification program baseline (as defined in December 1990). Mitigating strategies to reduce the overall program risk were proposed. All major program elements were evaluated, including double-shell tank waste characterization, Tank Farms, retrieval, pretreatment, vitrification, and grouting. Computer-based techniques were used to quantify risks to proceeding with construction of the Hanford Waste Vitrification Plant on the present baseline schedule. Risks to the potential vitrification of single-shell tank wastes and cesium and strontium capsules were also assessed. 62 refs., 38 figs., 26 tabs.

  10. Russian risk assessment methods and approaches

    SciTech Connect (OSTI)

    Dvorack, M.A.; Carlson, D.D.; Smith, R.E.

    1996-07-01T23:59:59.000Z

    One of the benefits resulting from the collapse of the Soviet Union is the increased dialogue currently taking place between American and Russian nuclear weapons scientists in various technical arenas. One of these arenas currently being investigated involves collaborative studies which illustrate how risk assessment is perceived and utilized in the Former Soviet Union (FSU). The collaborative studies indicate that, while similarities exist with respect to some methodologies, the assumptions and approaches in performing risk assessments were, and still are, somewhat different in the FSU as opposed to that in the US. The purpose of this paper is to highlight the present knowledge of risk assessment methodologies and philosophies within the two largest nuclear weapons laboratories of the Former Soviet Union, Arzamas-16 and Chelyabinsk-70. Furthermore, This paper will address the relative progress of new risk assessment methodologies, such as Fuzzy Logic, within the framework of current risk assessment methods at these two institutes.

  11. AN INTEGRATED VISION TO ASSIST THE EVOLUTION IN INDUSTRIAL RISK MANAGEMENT PROCESS IN FRANCE

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    AN INTEGRATED VISION TO ASSIST THE EVOLUTION IN INDUSTRIAL RISK MANAGEMENT PROCESS IN FRANCE Management in the field of environmental protection and risk prevention has evolved to the increasing with the complexity of risk management issues, in particular for those related to land-use planning. As technical

  12. Influence Diagrams as Decision-Making Tools for Pesticide Risk Management

    E-Print Network [OSTI]

    Newman, Michael C.

    Influence Diagrams as Decision-Making Tools for Pesticide Risk Management John F Carriger-based decisions about pesticide usage. Aside from technical data, pesticide risk management relies on diverse information on spraying efficacy and valuation of outcomes that would be necessary for making risk management

  13. Preliminary Technical Risk Analysis for the Geothermal Technologies Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the.pdfBreakingMay 2015 < prev next > Sun Mon2015 | DepartmentNEA-2011-02 ||

  14. Preliminary Technical Risk Analysis for the Geothermal Technologies Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn'tOrigin of Contamination in235-1DepartmentPreheatedDepartmentofEA-97-12 |—Ź A national laboratory

  15. Risk and Realities | Jefferson Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's PossibleRadiation Protection TechnicalResonantNovember 15 to March 15ARisk IdentificationRisk and

  16. Ideal Based Cyber Security Technical Metrics for Control Systems

    SciTech Connect (OSTI)

    W. F. Boyer; M. A. McQueen

    2007-10-01T23:59:59.000Z

    Much of the world's critical infrastructure is at risk from attack through electronic networks connected to control systems. Security metrics are important because they provide the basis for management decisions that affect the protection of the infrastructure. A cyber security technical metric is the security relevant output from an explicit mathematical model that makes use of objective measurements of a technical object. A specific set of technical security metrics are proposed for use by the operators of control systems. Our proposed metrics are based on seven security ideals associated with seven corresponding abstract dimensions of security. We have defined at least one metric for each of the seven ideals. Each metric is a measure of how nearly the associated ideal has been achieved. These seven ideals provide a useful structure for further metrics development. A case study shows how the proposed metrics can be applied to an operational control system.

  17. Boiler MACT Technical Assistance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: The FutureCommentsEnergyandapproximately 10|BlueFireBoiler MACT Technical

  18. Final Technical Report

    SciTech Connect (OSTI)

    Sobecky, Patricia A; Taillefert, Martial

    2013-03-29T23:59:59.000Z

    This final technical report describes results and findings from a research project to examine the role of microbial phosphohydrolase enzymes in naturally occurring subsurface microorganisms for the purpose of promoting the immobilization of the radionuclide uranium through the production of insoluble uranium phosphate minerals. The research project investigated the microbial mechanisms and the physical and chemical processes promoting uranium biomineralization and sequestration in oxygenated subsurface soils. Uranium biomineralization under aerobic conditions can provide a secondary biobarrier strategy to immobilize radionuclides should the metal precipitates formed by microbial dissimilatory mechanisms remobilize due to a change in redox state.

  19. SPEAR3 | Technical Documentation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's PossibleRadiation Protection245C Unlimited ReleaseWelcome ton n u a l r e p o Technical

  20. Technical Review Panel Report

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently AskedEnergyIssuesEnergy Solar Decathlon | DepartmentEnergyOffice -TechnicalTRP

  1. External Technical Review Report

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122Commercial602 1,39732 DOEDepartment of EnergyEric J.ExploringExternal Technical

  2. ARM - Technical Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOnItem NotEnergy,ARMForms About Become a UsergovAboutRecoverygovPublicationsTechnical

  3. Mechanical Engineering Department Technical Review

    SciTech Connect (OSTI)

    Carr, R.B.; Denney, R.M. (eds.)

    1981-07-01T23:59:59.000Z

    The Mechanical Engineering Department Technical Review is published to inform readers of various technical activities within the Department, promote exchange of ideas, and give credit to personnel who are achieving the results. The report is presented in two parts: technical achievements and publication abstracts. The first is divided into seven sections, each of which reports on an engineering division and its specific activities related to nuclear tests, nuclear explosives, weapons, energy systems, engineering sciences, magnetic fusion, and materials fabrication.

  4. Mechanical Engineering Department technical abstracts

    SciTech Connect (OSTI)

    Denney, R.M. (ed.)

    1982-07-01T23:59:59.000Z

    The Mechanical Engineering Department publishes listings of technical abstracts twice a year to inform readers of the broad range of technical activities in the Department, and to promote an exchange of ideas. Details of the work covered by an abstract may be obtained by contacting the author(s). Overall information about current activities of each of the Department's seven divisions precedes the technical abstracts.

  5. Mechanical engineering department technical review

    SciTech Connect (OSTI)

    Carr, R.B. Denney, R.M. (eds.)

    1981-01-01T23:59:59.000Z

    The Mechanical Engineering Department Technical Review is published to: (1) inform the readers of various technical activities within the department, (2) promote exchange of ideas, and (3) give credit to the personnel who are achieving the results. The report is formatted into two parts: technical acievements and publication abstracts. The first is divided into eight sections, one for each division in the department providing the reader with the names of the personnel and the division accomplishing the work.

  6. Ecological Risk Assessments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ecological Risk Assessments Ecological Risk Assessments Ecological risk assessment is the appraisal of potential adverse effects of exposure to contaminants on plants and animals....

  7. Risk Without Return

    E-Print Network [OSTI]

    Goldberg, Lisa R.; Mahmoud, Ola

    2013-01-01T23:59:59.000Z

    and Mitra, I. (2010). Extreme risk analysis. The Journal offrom the fact that the risk parity strategy was diversifiedboth in capital and in risk weights. Further research into

  8. Scientific and Technical Information Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2003-10-14T23:59:59.000Z

    The Order establishes requirements and responsibilities for managing DOE's scientific and technical information. Cancels DOE O 241.1. Canceled by DOE O 241.1B.

  9. Technical Services | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    noteworthy for their unique technical capabilities: Central Shops facility performs welding and brazing for high-vacuum applications, machining of radioactive materials, and a...

  10. Hydrogen Storage Technical Team Roadmap

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and technology pathways are impacted by their analyses. These technical teams include Fuel Cells, Fuel Pathway Integration, Hydrogen Delivery, Hydrogen Production, Materials,...

  11. APS Technical Systems Monitoring Page

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Photon Source Technical Systems Accelerator Systems Storage Ring Status for the past 24 hours with real Time of Day User beam delineated. Current, Lifetime, History with 24-hr...

  12. Risk Dynamics?An Analysis for the Risk of Change

    E-Print Network [OSTI]

    Huang, Tailin

    2010-01-01T23:59:59.000Z

    Is Quantitative Risk Assessment?" Risk Analysis, Aubrey,quantitative methods of how people do science, engineering and risk analysisthe Quantitative Definition of Risk." Risk Analysis, 1(1),

  13. MILITARY TECHNICAL ACADEMY Vol. XXII, No. 4

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    #12;MILITARY TECHNICAL ACADEMY Vol. XXII, No. 4 © Military Technical Academy Publishing House Technical Academy of Bucharest, Romania Col. Prof. Eng. IOAN NICOLAESCU, Ph.D. The Military Technical Academy of Bucharest, Romania Prof. Eng. VICTOR-VALERIU PATRICIU, Ph.D. The Military Technical Academy

  14. Joint Technical Operations Team | National Nuclear Security Administra...

    National Nuclear Security Administration (NNSA)

    Render Safe Joint Technical Operations Team Joint Technical Operations Team JTOT Logo NNSA's Joint Technical Operations Team (JTOT) provides specialized technical...

  15. Enterprise Risk Management Program

    E-Print Network [OSTI]

    Hayden, Nancy J.

    Enterprise Risk Management Program Guide to Risk Assessment & Response August 16, 2012 #12; i ...........26 List of Figures Figure 1: The Risk Management Process.......................................................................................................12 #12; 1 Overview The risk management process--of identifying, analyzing, evaluating

  16. Credit Risk Analyst

    Broader source: Energy.gov [DOE]

    The incumbent in this position will serve as a Credit Risk Analyst in the Transacting and Credit Risk Management department of the Office of Risk Management. The Transacting and Credit Risk...

  17. Memorandum, Department of Energy Standard for Control and Use of Probabilistic Risk Assessments

    Broader source: Energy.gov [DOE]

    The purpose of this memorandum is to distribute for interim use and comment a new draft Department of Energy (DOE) Technical Standard for Control and Use of Probabilistic Risk Assessments.

  18. Texas Phosphorus Index TECHNICAL NOTES

    E-Print Network [OSTI]

    Mukhtar, Saqib

    for West Texas, see Figure 1. NRCS and Extension Service specialists in Texas developed the P indicesTexas Phosphorus Index TECHNICAL NOTES U.S. DEPARTMENT OF AGRICULTURE NATURAL RESOURCES CONSERVATION SERVICE TEXAS Revised December, 2012 AGRONOMY TECHNICAL NOTE NUMBER ­ 15 PHOSPHORUS ASSESSMENT

  19. Computer Science Department Technical Report

    E-Print Network [OSTI]

    Shahriar, Selim

    of computing #12;Virtuoso: A System for Virtual Machine Marketplaces Technical Report NWU-CS-04-39 Alex that presents the abstraction of a new raw physical machine on the buyer's network. This report describesComputer Science Department Technical Report NWU-CS-04-39 July 20, 2004 Virtuoso: A System

  20. Technical planning activity: Final report

    SciTech Connect (OSTI)

    Not Available

    1987-01-01T23:59:59.000Z

    In April 1985, the US Department of Energy's (DOE's) Office of Fusion Energy commissioned the Technical Planning Activity (TPA). The purpose of this activity was to develop a technical planning methodology and prepare technical plans in support of the strategic and policy framework of the Magnetic Fusion Program Plan issued by DOE in February 1985. Although this report represents the views of only the US magnetic fusion community, it is international in scope in the sense that the technical plans contained herein describe the full scope of the tasks that are prerequisites for the commercialization of fusion energy. The TPA has developed a well-structured methodology that includes detailed definitions of technical issues, definitions of program areas and elements, statements of research and development objectives, identification of key decision points and milestones, and descriptions of facility requirements.

  1. Technical applications of aerogels

    SciTech Connect (OSTI)

    Hrubesh, L.W.

    1997-08-18T23:59:59.000Z

    Aerogel materials posses such a wide variety of exceptional properties that a striking number of applications have developed for them. Many of the commercial applications of aerogels such as catalysts, thermal insulation, windows, and particle detectors are still under development and new application as have been publicized since the ISA4 Conference in 1994: e.g.; supercapacitors, insulation for heat storage in automobiles, electrodes for capacitive deionization, etc. More applications are evolving as the scientific and engineering community becomes familiar with the unusual and exceptional physical properties of aerogels, there are also scientific and technical application, as well. This paper discusses a variety of applications under development at Lawrence Livermore National Laboratory for which several types of aerogels are formed in custom sizes and shapes. Particular discussions will focus on the uses of aerogels for physics experiments which rely on the exceptional, sometimes unique, properties of aerogels.

  2. FINAL/ SCIENTIFIC TECHNICAL REPORT

    SciTech Connect (OSTI)

    McDonald, Henry; Singh, Suminderpal

    2006-08-28T23:59:59.000Z

    The overall objective of the Chattanooga fuel cell demonstrations project was to develop and demonstrate a prototype 5-kW grid-parallel, solid oxide fuel cell (SOFC) system that co-produces hydrogen, based on Ion America’s technology. The commercial viability of the 5kW SOFC system was tested by transporting, installing and commissioning the SOFC system at the Alternative Energy Laboratory at the University of Tennessee – Chattanooga. The system also demonstrated the efficiency and the reliability of the system running on natural gas. This project successfully contributed to the achievement of DOE technology validation milestones from the Technology Validation section of the Hydrogen, Fuel Cells and Infrastructure Technologies Program Multi-Year Research, Development and Demonstration Plan. Results of the project can be found in the final technical report.

  3. LLNL 1981: technical horizons

    SciTech Connect (OSTI)

    Not Available

    1981-07-01T23:59:59.000Z

    Research programs at LLNL for 1981 are described in broad terms. In his annual State of the Laboratory address, Director Roger Batzel projected a $481 million operating budget for fiscal year 1982, up nearly 13% from last year. In projects for the Department of Energy and the Department of Defense, the Laboratory applies its technical facilities and capabilities to nuclear weapons design and development and other areas of defense research that include inertial confinement fusion, nonnuclear ordnances, and particle-beam technology. LLNL is also applying its unique experience and capabilities to a variety of projects that will help the nation meet its energy needs in an environmentally acceptable manner. A sampling of recent achievements by LLNL support organizations indicates their diversity. (GHT)

  4. Risk Management, Mar 2012 Risk Management

    E-Print Network [OSTI]

    Risk Management, Mar 2012 Risk Management Conditions of Volunteer Service (Please send completed form to the Office of Risk Management) riskmanagement@uoregon.edu Fax: 541-346-7008 As a volunteer Tort Claims Act, ORS 30.260-300, and Oregon Department of Administrative Services Risk Management

  5. CANCER RISKS AM I AT RISK?

    E-Print Network [OSTI]

    Hardy, Christopher R.

    CANCER RISKS AM I AT RISK? It is often hard to explain why one person develops cancer and another does not. There are risk factors that could increase a person's likelihood of developing cancer, however, some people may have many of these risk factors and never get cancer. When thinking about your

  6. Boiler Maximum Achievable Control Technology (MACT) Technical...

    Energy Savers [EERE]

    Boiler Maximum Achievable Control Technology (MACT) Technical Assistance - Fact Sheet, April 2015 Boiler Maximum Achievable Control Technology (MACT) Technical Assistance - Fact...

  7. Building America Residential Energy Efficiency Technical Update...

    Energy Savers [EERE]

    Residential Energy Efficiency Technical Update Meeting: August 2011 Building America Residential Energy Efficiency Technical Update Meeting: August 2011 On this page, you may link...

  8. Low Emission Development Strategies (LEDS): Technical, Institutional...

    Open Energy Info (EERE)

    Strategies (LEDS): Technical, Institutional and Policy Lessons Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Low Emission Development Strategies (LEDS): Technical,...

  9. Independent Oversight Review, Babcock & Wilcox Technical Services...

    Office of Environmental Management (EM)

    Independent Oversight Review, Babcock & Wilcox Technical Services Y-12, LLC - July 2012 Independent Oversight Review, Babcock & Wilcox Technical Services Y-12, LLC - July 2012 July...

  10. Federal Energy Management Program (FEMP) Technical Assistance...

    Energy Savers [EERE]

    Federal Energy Management Program (FEMP) Technical Assistance Request Portal User Guide Federal Energy Management Program (FEMP) Technical Assistance Request Portal User Guide...

  11. Vice President, Engineering and Technical Services

    Broader source: Energy.gov [DOE]

    The Engineering and Technical Services organization is responsible for implementing the transmission capital program, providing technical support for the transmission maintenance program and...

  12. A Technical Databook for Geothermal Energy Utilization

    E-Print Network [OSTI]

    Phillips, S.L.

    1981-01-01T23:59:59.000Z

    A TECHNICAL DATABOOK FOR GEOTHERMAL ENERGY UTILIZATION S.L.Technical Databook for Geothermal Energy Utilization* s. L.Survey, Menlo Park, CA. Geothermal Energy Development, CA.

  13. Space Conditioning Standing Technical Commitee Presentation ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Commitee Presentation Space Conditioning Standing Technical Commitee Presentation This presentation outlines the goals of the Space Conditioning Standing Technical ommittee, as...

  14. Technical Consultant Report Template | Department of Energy

    Energy Savers [EERE]

    C3d Technical Consultant Report Template.pdf More Documents & Publications External Independent Review (EIR) Report Template Technical Consultant Contract Evaluation Consultant RFP...

  15. Previous Technical Assistance | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Technical assistance provided to WGAWIEB by the Electricity Market Studies Group of LBNL and The Regulatory Assistance Project (RAP); and More limited technical assistance...

  16. Energy Department Technical Assistance Bolsters Tribal Clean...

    Energy Savers [EERE]

    Technical Assistance Bolsters Tribal Clean Energy Deployment Energy Department Technical Assistance Bolsters Tribal Clean Energy Deployment December 2, 2011 - 3:39pm Addthis The...

  17. Ocean Thermal Extractable Energy Visualization: Final Technical...

    Office of Environmental Management (EM)

    Ocean Thermal Extractable Energy Visualization: Final Technical Report Ocean Thermal Extractable Energy Visualization: Final Technical Report Report about the Ocean Thermal...

  18. Technical Journal The Bendix Technical Journal publishes noteworthy results of

    E-Print Network [OSTI]

    Rathbun, Julie A.

    ADVISORY BOARD E. C. Johnson, Chairman R. E. Esch W. E. Kock L. J. Larsen TECHNICAL CONSULTANTS ALSEP: The Scientific Voice of the Moon L. R. Lewis Some Aspects of ALSEP Structural/Thermal Design J. L

  19. The Independent Technical Analysis Process

    SciTech Connect (OSTI)

    Duberstein, Corey A.; Ham, Kenneth D.; Dauble, Dennis D.; Johnson, Gary E.

    2007-04-13T23:59:59.000Z

    The Bonneville Power Administration (BPA) contracted with the Pacific Northwest National Laboratory (PNNL) to provide technical analytical support for system-wide fish passage information (BPA Project No. 2006-010-00). The goal of this project was to produce rigorous technical analysis products using independent analysts and anonymous peer reviewers. In the past, regional parties have interacted with a single entity, the Fish Passage Center to access the data, analyses, and coordination related to fish passage. This project provided an independent technical source for non-routine fish passage analyses while allowing routine support functions to be performed by other well-qualified entities.

  20. GEM Technical Design Report

    SciTech Connect (OSTI)

    Not Available

    1993-07-31T23:59:59.000Z

    The GEM collaboration was formed in June 1991 to develop a major detector for the SSC. The primary physics objectives of GEM are those central to the motivation for the SSC, to study high p{sub T} physics - exemplified by the search for Higgs bosons - and to search for new physics beyond the standard model. The authors present in this Technical Design Report (TDR) a detector with broad capabilities for the discovery and subsequent study of electroweak symmetry breaking, the origin of mass and flavor, and other physics requiring precise measurements of gammas, electrons, and muons - hence the name, GEM. In addition, as a design goal, they have taken care to provide the robustness needed to do the physics that requires high luminosity. Finally, good coverage and hermeticity allow the detection of missing transverse energy, E{sub T}. The GEM design emphasizes clean identification and high resolution measurement of the primary physics signatures for high p{sub T} physics. The approach is to make precise energy measurements that maximize the sensitivity to rare narrow resonances, to detect the elementary interaction products (quarks, leptons, and photons), and to build in the features required to reduce backgrounds.

  1. Final Technical Report

    SciTech Connect (OSTI)

    Stoessel, Chris

    2013-11-13T23:59:59.000Z

    This project developed a new high-performance R-10/high SHGC window design, reviewed market positioning and evaluated manufacturing solutions required for broad market adoption. The project objectives were accomplished by: identifying viable technical solutions based on modeling of modern and potential coating stacks and IGU designs; development of new coating material sets for HM thin film stacks, as well as improved HM IGU designs to accept multiple layers of HM films; matching promising new coating designs with new HM IGU designs to demonstrate performance gains; and, in cooperation with a window manufacturer, assess the potential for high-volume manufacturing and cost efficiency of a HM-based R-10 window with improved solar heat gain characteristics. A broad view of available materials and design options was applied to achieve the desired improvements. Gated engineering methodologies were employed to guide the development process from concept generation to a window demonstration. The project determined that a slightly de-rated window performance allows formulation of a path to achieve the desired cost reductions to support end consumer adoption.

  2. FINAL TECHNICAL REPORT

    SciTech Connect (OSTI)

    STEFAN VASILE; ZHENG LI

    2010-06-17T23:59:59.000Z

    High-resolution tracking detectors based on Active Pixel Sensor (APS) have been valuable tools in Nuclear Physics and High-Energy Physics research, and have contributed to major discoveries. Their integration time, radiation length and readout rate is a limiting factor for the planed luminosity upgrades in nuclear and high-energy physics collider-based experiments. The goal of this program was to demonstrate and develop high-gain, high-resolution tracking detector arrays with faster readout, and shorter radiation length than APS arrays. These arrays may operate as direct charged particle detectors or as readouts of high resolution scintillating fiber arrays. During this program, we developed in CMOS large, high-resolution pixel sensor arrays with integrated readout, and reset at pixel level. Their intrinsic gain, high immunity to surface and moisture damage, will allow operating these detectors with minimal packaging/passivation requirements and will result in radiation length superior to APS. In Phase I, we designed and fabricated arrays with calorimetric output capable of sub-pixel resolution and sub-microsecond readout rate. The technical effort was dedicated to detector and readout structure development, performance verification, as well as to radiation damage and damage annealing.

  3. 2011 PERFORMANCE ASSESSMENT COMMUNITY OF PRACTICE TECHNICAL EXCHANGE - SUMMARY

    SciTech Connect (OSTI)

    Seitz, R.

    2011-12-30T23:59:59.000Z

    The Performance Assessment Community of Practice (PA CoP) was developed in 2008 to improve consistency and quality in the preparation of performance assessments (PAs) and risk assessments across the Department of Energy (DOE) Complex. The term, PA, is used to represent all of these modeling applications in this report. The PA CoP goals are to foster the exchange of information among PA practitioners and to share lessons learned from PAs conducted for DOE, commercial disposal facilities, and international entities. Technical exchanges and workshops are a cornerstone of PA CoP activities. Previous technical exchanges have addressed Engineered Barriers (2009 - http://www.cresp.org/education/workshops/pacop/), the Advanced Simulation Capability for Environmental Management and the Cementitious Barriers Partnership (2010 - http://srnl.doe.gov/copexchange/links.htm). Each technical exchange also includes summary presentations regarding activities at DOE, the Nuclear Regulatory Commission (NRC) and other organizations (e.g., International Atomic Energy Agency (IAEA)) as well as a number of presentations from selected sites to provide insight and perspective from on-going modeling activities. Through the deployment of PA Assistance Teams, the PA CoP has also been engaged in the development of new PAs across the DOE Complex. As a way of improving consistency in the preparation of new PAs, the teams provide technical advice and share experiences, noteworthy practices, and lessons learned from previous Low-Level Waste Disposal Facility Federal Review Group (LFRG) reviews. Teams have provided support for PAs at Hanford, Idaho, Paducah and Portsmouth. The third annual PA CoP Technical Exchange was held on May 25-26, 2011 in Atlanta, GA. The PA CoP Steering Committee Meeting held its first meeting on May 24 prior to the Technical Exchange. Decision making using models and software quality assurance were the topical emphasis for the exchange. A new feature at the 2011 technical exchange was the use of panel discussions to solicit feedback from regulators and practitioners. This report summarizes discussions and recommendations from the steering committee meeting and presentations and feedback obtained at the technical exchange. Appendix I includes the steering committee meeting agenda and Appendix II includes the agenda for the technical exchange and a screenshot of the presentations and video files that are available online.

  4. Istanbul Technical University Istanbul, Turkey

    E-Print Network [OSTI]

    Duchowski, Andrew T.

    and ocean engineering Faculty of science and letters Faculty of management Faculty of Aeronautics Engineering Shipbuilding and Ocean Engineering Mathematics Engineering Physics Engineering Chemistry distinguished in Turkey with its engineering and architecture education. Istanbul Technical University

  5. Offshoring and Directed Technical Change

    E-Print Network [OSTI]

    Acemoglu, Daron

    2012-11-24T23:59:59.000Z

    To study the short-run and long-run implications on wage inequality, we introduce directed technical change into a Ricardian model of offshoring. A unique final good is produced by combining a skilled and an unskilled ...

  6. Technical challenges for dismantlement verification

    SciTech Connect (OSTI)

    Olinger, C.T.; Stanbro, W.D.; Johnston, R.G.; Nakhleh, C.W.; Dreicer, J.S.

    1997-11-01T23:59:59.000Z

    In preparation for future nuclear arms reduction treaties, including any potential successor treaties to START I and II, the authors have been examining possible methods for bilateral warhead dismantlement verification. Warhead dismantlement verification raises significant challenges in the political, legal, and technical arenas. This discussion will focus on the technical issues raised by warhead arms controls. Technical complications arise from several sources. These will be discussed under the headings of warhead authentication, chain-of-custody, dismantlement verification, non-nuclear component tracking, component monitoring, and irreversibility. The authors will discuss possible technical options to address these challenges as applied to a generic dismantlement and disposition process, in the process identifying limitations and vulnerabilities. They expect that these considerations will play a large role in any future arms reduction effort and, therefore, should be addressed in a timely fashion.

  7. Facility worker technical basis document

    SciTech Connect (OSTI)

    SHULTZ, M.V.

    2003-08-28T23:59:59.000Z

    This technical basis document was developed to support the Tank Farm Documented Safety Analysis (DSA). It describes the criteria and methodology for allocating controls to hazardous conditions with significant facility work consequence and presents the results of the allocation.

  8. Risk Management Strategy Introduction

    E-Print Network [OSTI]

    Edinburgh, University of

    Risk Management Strategy Introduction 1. The risk of adverse consequences is inherent in all activity. Dynamic enterprise will inevitably create new risks. Risk management is about ensuring that all significant relevant risks are understood and prioritised as part of normal management

  9. EPA's Financial and Technical Resources

    E-Print Network [OSTI]

    Perea, S. M.

    2011-01-01T23:59:59.000Z

    EPA?s Financial and Technical Resources Suzanna M. Perea, EPA Region VI CATEE Conference November 9, 2011 EPA?s Primary Role Where and how communities are built has a major impact on the environment and on public health. Many programs... are aimed at supporting activities that build more sustainable communities. Protecting Human Health and the Environment Smart Growth Implementation Assistance (SGIA) Grants http://www.epa.gov/smartgrowth/sgia.htm Building Blocks Technical...

  10. Guam Initial Technical Assessment Report

    SciTech Connect (OSTI)

    Baring-Gould, I.; Conrad, M.; Haase, S.; Hotchkiss, E.; McNutt, P.

    2011-04-01T23:59:59.000Z

    Under an interagency agreement, funded by the Department of Interior's (DOI) Office of Insular Affairs (OIA), the National Renewable Energy Laboratory (NREL) was tasked to deliver technical assistance to the island of Guam by conducting an island initial technical assessment that would lay out energy consumption and production data and establish a baseline. This assessment will be used to conduct future analysis and studies by NREL that will estimate energy efficiency and renewable energy potential for the island of Guam.

  11. CTBT technical issues handbook

    SciTech Connect (OSTI)

    Zucca, J.J. [ed.

    1994-05-01T23:59:59.000Z

    The purpose of this handbook is to give the nonspecialist in nuclear explosion physics and nuclear test monitoring an introduction to the topic as it pertains to a Comprehensive Test Ban Treaty (CTBT). The authors have tried to make the handbook visually oriented, with figures paired to short discussions. As such, the handbook may be read straight through or in sections. The handbook covers four main areas and ends with a glossary, which includes both scientific terms and acronyms likely to be encountered during CTBT negotiations. The following topics are covered: (1) Physics of nuclear explosion experiments. This is a description of basic nuclear physics and elementary nuclear weapon design. Also discussed are testing practices. (2) Other nuclear experiments. This section discusses experiments that produce small amounts of nuclear energy but differ from explosion experiments discussed in the first chapter. This includes the type of activities, such as laser fusion, that would continue after a CTBT is in force. (3) Monitoring tests in various environments. This section describes the different physical environments in which a test could be conducted (underground, in the atmosphere, in space, underwater, and in the laboratory); the sources of non-nuclear events (such as earthquakes and mining operations); and the opportunities for evasion. (4) On-site inspections. A CTBT is likely to include these inspections as an element of the verification provisions, in order to resolve the nature of ambiguous events. This chapter describes some technical considerations and technologies that are likely to be useful. (5) Selecting verification measures. This chapter discusses the uncertain nature of the evidence from monitoring systems and how compliance judgments could be made, taking the uncertainties into account. It also discusses how to allocate monitoring resources, given the likelihood of testing by various countries in various environments.

  12. Final Technical Report

    SciTech Connect (OSTI)

    Joel Walls, Richard Uden, Scott Singleton, Rone Shu, Gary Mavko

    2005-04-12T23:59:59.000Z

    Using current methods, oil and gas in the subsurface cannot be reliably predicted from seismic data. This causes domestic oil and gas fields to go undiscovered and unexploited, thereby increasing the need to import energy. The general objective of this study was to demonstrate a simple and effective methodology for estimating reservoir properties (gas saturation in particular, but also including lithology, net to gross ratios, and porosity) from seismic attenuation and other attributes using P and S-waves. Phase I specific technical objectives: • Develop Empirical or Theoretical Rock Physics Relations for Qp and Qs • Create P-wave and S-wave Synthetic Seismic Modeling Algorithms with Q • Compute P-wave and S-wave Q Attributes from Multi-component Seismic Data All objectives defined in the Phase I proposal were accomplished. During the course of this project, a new class of seismic analysis was developed based on compressional and shear wave inelastic rock properties (attenuation). This method provides a better link between seismic data and the presence of hydrocarbons. The technique employs both P and S-wave data to better discriminate between attenuation due to hydrocarbons versus energy loss due to other factors such as scattering and geometric spreading. It was demonstrated that P and S attenuation can be computed from well log data and used to generate synthetic seismograms. Rock physics models for P and S attenuation were tested on a well from the Gulf of Mexico. The P and S-wave Q attributes were computed on multi-component 2D seismic data intersecting this well. These methods generated reasonable results, and most importantly, the Q attributes indicated gas saturation.

  13. Final Technical Report

    SciTech Connect (OSTI)

    Juan Camilo Serrano

    2011-12-16T23:59:59.000Z

    New and novel material and process technologies applied in wind blade designs and production are critical to increasing the competitiveness of wind power generation against traditional sources of energy. In this project, through collaboration between PPG Industries and MAG Industrial Automation Systems, the potential of using automated manufacturing for the production of fiber glass composite wind blades was evaluated from both technical and economic points of view. Further, it was demonstrated that by modifying the standard blade raw material forms through the use of cost effective pre-impregnated rovings coupled with using an automated fiber placement machine to lay up the parts, it is possible to produce state of the art composite laminates with significantly improved mechanical performance and with higher processing rates than standard blade production technology allows for today, thereby lowering the cost of energy over turbine blades made using traditional processes and materials. In conformity with the scope of work of the submitted proposal, the project team completed each task and documented and reported its findings on the appropriate quarterly report submitted to the DOE project team. The activities and this report are divided into 5 subtasks: (1) Material Investigation - Reviews traditional materials and key specifications and testing methods; (2) Manufacturing and Automation - Identifies new candidate material forms and automated layup processes; (3) Process Development - Performs trials of candidate materials and processes; (4) Predictive Analysis - Assesses impact of new material forms and automated processes on a model blade design; and (5) Feasibility Assessment - Compares traditional manufacturing processes and materials to new candidate material forms and automated processes.

  14. A risk evaluation for the fuel retrieval sub-project

    SciTech Connect (OSTI)

    Carlisle, B.S.

    1996-10-11T23:59:59.000Z

    This study reviews the technical, schedule and budget baselines of the sub-project to assure all significant issues have been identified on the sub-project issues management list. The issue resolution dates are identified and resolution plans established. Those issues that could adversely impact procurement activities have been uniquely identified on the list and a risk assessment completed.

  15. A Stochastic Processes Toolkit for Risk Management Damiano Brigo

    E-Print Network [OSTI]

    Brigo, Damiano

    in the quantitative analysis. The broad qualitative features addressed here are fat tails and mean reversion. We give technical analysis of the product or the entity under scrutiny. The quantitative analysis is not the finalA Stochastic Processes Toolkit for Risk Management Damiano Brigo , Antonio Dalessandro , Matthias

  16. Taking Risk Assessment and Management to the Next Level: Program-Level Risk Analysis to Enable Solid Decision-Making on Priorities and Funding

    SciTech Connect (OSTI)

    Nelson, J. G.; Morton, R. L.; Castillo, C.; Dyer, G.; Johnson, N.; McSwain, J. T.

    2011-02-01T23:59:59.000Z

    A multi-level (facility and programmatic) risk assessment was conducted for the facilities in the Nevada National Security Site (NNSS) Readiness in Technical Base and Facilities (RTBF) Program and results were included in a new Risk Management Plan (RMP), which was incorporated into the fiscal year (FY) 2010 Integrated Plans. Risks, risk events, probability, consequence(s), and mitigation strategies were identified and captured, for most scope areas (i.e., risk categories) during the facilitated risk workshops. Risk mitigations (i.e., efforts in addition to existing controls) were identified during the facilitated risk workshops when the risk event was identified. Risk mitigation strategies fell into two broad categories: threats or opportunities. Improvement projects were identified and linked to specific risks they mitigate, making the connection of risk reduction through investments for the annual Site Execution Plan. Due to the amount of that was collected, analysis to be performed, and reports to be generated, a Risk Assessment/ Management Tool (RAMtool) database was developed to analyze the risks in real-time, at multiple levels, which reinforced the site-level risk management process and procedures. The RAMtool database was developed and designed to assist in the capturing and analysis of the key elements of risk: probability, consequence, and impact. The RAMtool calculates the facility-level and programmatic-level risk factors to enable a side-by-side comparison to see where the facility manager and program manager should focus their risk reduction efforts and funding. This enables them to make solid decisions on priorities and funding to maximize the risk reduction. A more active risk management process was developed where risks and opportunities are actively managed, monitored, and controlled by each facility more aggressively and frequently. risk owners have the responsibility and accountability to manage their assigned risk in real-time, using the RAMtool database.

  17. BUILDING A RISK MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PL LDING A RISK MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PLAN

    E-Print Network [OSTI]

    Florida, University of

    BUILDING A RISK MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PL LDING A RISK MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PLAN MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PLAN BUILDING A R RISK MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PLAN BUILDIN T PLAN BUILDING A RISK MANAGEMENT PLAN BUILDING A RISK MANAGEM

  18. Enterprise Risk Management Framework

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Framework The Enterprise Risk Management (ERM) framework includes four steps: identify the risks, determine the probability and impact of each one, identify controls that are...

  19. Development of hot dry rock geothermal resources; technical and economic issues

    SciTech Connect (OSTI)

    Tester, J.W.

    1980-01-01T23:59:59.000Z

    Technical and economic issues related to the commercial feasibility of hot dry rock geothermal energy for producing electricity and heat are discussed. Topics covered include resource characteristics, reservoir thermal capacity and lifetime, drilling and surface plant costs, financial risk and anticipated rate of return. The current status of research and deveopment efforts in the US are also summarized.

  20. Technical basis for the transportation related handling representative accidents and associated hazards condition

    SciTech Connect (OSTI)

    TOMASZEWSKI, T.A.

    2003-03-21T23:59:59.000Z

    This technical basis document was developed to support the Tank Farms Documented Safety Analysis (DSA), and describes the risk binning process and the technical basis for assigning risk bins for the handling and movement of tank farm waste sample containers, and mixed, low-level, and hazardous operational waste containers incidental to onsite vehicle transportation representative accident and associated hazardous conditions. The purpose of the risk binning process is to determine the need for safety-significant structures, systems, and components (SSC) and technical safety requirement (TSR)-level controls for a given representative accident or represented hazardous conditions based on an evaluation of the frequency and consequence. Note that the risk binning process is not applied to facility workers because all facility worker hazardous conditions are considered for safety-significant SSCs and/or TSR-level controls. See RPP-14286, Facility Worker Technical Basis Document, for these considerations. Determination of the need for safety-class SSCs was performed in accordance with DOE-STD-3009-94, Preparation Guide for US. Department of Energy Nonreactor Nuclear Facility Documented Safety Analyses, as described in this report.

  1. Technical Support and Transfer of Geothrmal Technical Knowledge and Information

    SciTech Connect (OSTI)

    John W. Lund

    2007-11-14T23:59:59.000Z

    The Geo-Heat Center (GHC) staff provided responses to 1442 technical support requests during the contract period (April 1, 2006 to September 30, 2007), which were six quarters under this contract. Our website, consisting of 1900 files, also contributes to our technical assistance activity. Downloaded files were 1,889,323 (3,448 per day) from our website, the total number of users was 1,365,258 (2,491 per day), and the total number of hits were 6,008,500 (10,064 per day). The GHC staff attended 60 workshops, short course and professional meeting and made 29 technical presentations. The staff also prepared and mailed out 2,000 copies of each of five issues of the GHC Quaterly Bulletin which contained 26 articles. We also mailed out approximately 5,000 papers and publications to interested individuals and organizations.

  2. Nutrient Management TrainingNutrient Management Training for Technical Service Providersfor Technical Service Providers

    E-Print Network [OSTI]

    Nutrient ManagementNutrient Management ­­ Record KeepingRecord Keeping ­­ Feed ManagementFeed ManagementNutrient Management TrainingNutrient Management Training for Technical Service Providersfor Management Planning Technical Guidance.Management Planning Technical Guidance. Manure and Wastewater Handling

  3. Risk Analysis and Decision Making FY 2013 Milestone Report

    SciTech Connect (OSTI)

    Engel, David W.; Dalton, Angela C.; Dale, Crystal; Jones, Edward; Thompson, J.

    2013-06-01T23:59:59.000Z

    Risk analysis and decision making is one of the critical objectives of CCSI, which seeks to use information from science-based models with quantified uncertainty to inform decision makers who are making large capital investments. The goal of this task is to develop tools and capabilities to facilitate the development of risk models tailored for carbon capture technologies, quantify the uncertainty of model predictions, and estimate the technical and financial risks associated with the system. This effort aims to reduce costs by identifying smarter demonstrations, which could accelerate development and deployment of the technology by several years.

  4. The role of risk management in the design of diagnostics for fusion reactors

    SciTech Connect (OSTI)

    Ingesson, L. C. [Fusion for Energy, Josep Pla 2, Torres Diagonal Litoral B3, 08019 Barcelona (Spain); Collaboration: F4E Diagnostic Project Team

    2014-08-21T23:59:59.000Z

    A project-oriented approach is beneficial for the selection and design of viable diagnostics for fusion reactors because of the associated complex physical and organizational environment. The project-oriented approach includes rigorous risk management. The nature and impact of risks related to technical, organizational and commercial aspects in relation to the development of ITER diagnostics under EU responsibility are analyzed. The majority of risks are related to organizational aspects and technical feasibility issues. The experience with ITER is extrapolated to DEMO and beyond. It should not be taken for granted that technical solutions will be found, while a risk analysis of various diagnostic techniques with quantitative assessments undertaken early in the design of DEMO would be beneficial.

  5. A surety engineering framework to reduce cognitive systems risks.

    SciTech Connect (OSTI)

    Caudell, Thomas P. (University of New Mexico, Albuquerque, NM); Peercy, David Eugene; Caldera, Eva O. (University of New Mexico, Albuquerque, NM); Shaneyfelt, Wendy L.

    2008-12-01T23:59:59.000Z

    Cognitive science research investigates the advancement of human cognition and neuroscience capabilities. Addressing risks associated with these advancements can counter potential program failures, legal and ethical issues, constraints to scientific research, and product vulnerabilities. Survey results, focus group discussions, cognitive science experts, and surety researchers concur technical risks exist that could impact cognitive science research in areas such as medicine, privacy, human enhancement, law and policy, military applications, and national security (SAND2006-6895). This SAND report documents a surety engineering framework and a process for identifying cognitive system technical, ethical, legal and societal risks and applying appropriate surety methods to reduce such risks. The framework consists of several models: Specification, Design, Evaluation, Risk, and Maturity. Two detailed case studies are included to illustrate the use of the process and framework. Several Appendices provide detailed information on existing cognitive system architectures; ethical, legal, and societal risk research; surety methods and technologies; and educing information research with a case study vignette. The process and framework provide a model for how cognitive systems research and full-scale product development can apply surety engineering to reduce perceived and actual risks.

  6. Global Climate & Catastrophic Risk

    E-Print Network [OSTI]

    de Lijser, Peter

    Global Climate & Catastrophic Risk Forum 2012 A Joint Program with LA RIMS Education Day Rethinking Catastrophic Risk in Risk Management: Earthquake-Related Challenges Featuring: Keynote Speaker Dr. Frank Beuthin, Willis Group Holdings Plc. Yohei Miyamoto, Aon Risk Solutions Curtis deVera, Marsh

  7. Technical Publications | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently AskedEnergyIssuesEnergy Solar Decathlon | Department ofHeating1TechnicalTechnical

  8. US DRIVE Materials Technical Team Roadmap | Department of Energy

    Energy Savers [EERE]

    Materials Technical Team Roadmap US DRIVE Materials Technical Team Roadmap The Materials Technical Team (MTT) focuses primarily on reducing the mass of structural systems such as...

  9. FreedomCAR and Fuel Partnership 2008 Highlights of Technical...

    Energy Savers [EERE]

    8 Highlights of Technical Accomplishments FreedomCAR and Fuel Partnership 2008 Highlights of Technical Accomplishments Report containing brief summaries of key technical...

  10. FreedomCAR and Fuel Partnership 2007 Highlights of Technical...

    Energy Savers [EERE]

    7 Highlights of Technical Accomplishments FreedomCAR and Fuel Partnership 2007 Highlights of Technical Accomplishments Report containing brief summaries of key technical...

  11. FreedomCAR and Fuel Partnership 2009 Highlights of Technical...

    Energy Savers [EERE]

    9 Highlights of Technical Accomplishments FreedomCAR and Fuel Partnership 2009 Highlights of Technical Accomplishments This report summarizes key technical accomplishments achieved...

  12. FreedomCAR and Fuel Partnership 2010 Highlights of Technical...

    Energy Savers [EERE]

    10 Highlights of Technical Accomplishments FreedomCAR and Fuel Partnership 2010 Highlights of Technical Accomplishments This report summarizes key technical accomplishments...

  13. FreedomCAR and Fuel Partnership 2006 Highlights of Technical...

    Energy Savers [EERE]

    6 Highlights of Technical Accomplishments FreedomCAR and Fuel Partnership 2006 Highlights of Technical Accomplishments Report containing brief summaries of key technical...

  14. FreedomCAR and Fuel Partnership 2005 Highlights of Technical...

    Energy Savers [EERE]

    5 Highlights of Technical Accomplishments FreedomCAR and Fuel Partnership 2005 Highlights of Technical Accomplishments Report containing brief summaries of key technical...

  15. Table I: Technical Targets for Catalyst Coated Membranes (CCMs...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    I: Technical Targets for Catalyst Coated Membranes (CCMs): Automotive Table I: Technical Targets for Catalyst Coated Membranes (CCMs): Automotive Technical targets for fuel cell...

  16. Next Generation Nuclear Plant Project Technology Development Roadmaps: The Technical Path Forward for 750–800°C Reactor Outlet Temperature

    SciTech Connect (OSTI)

    John Collins

    2009-08-01T23:59:59.000Z

    This document presents the NGNP Critical PASSCs and defines their technical maturation path through Technology Development Roadmaps (TDRMs) and their associated Technology Readiness Levels (TRLs). As the critical PASSCs advance through increasing levels of technical maturity, project risk is reduced and the likelihood of within-budget and on-schedule completion is enhanced. The current supplier-generated TRLs and TDRMs for a 750–800°C reactor outlet temperature (ROT) specific to each supplier are collected in Appendix A.

  17. Cold Vacuum Drying (CVD) Facility Technical Safety Requirements

    SciTech Connect (OSTI)

    KRAHN, D.E.

    2000-08-08T23:59:59.000Z

    The Technical Safety Requirements (TSRs) for the Cold Vacuum Drying Facility define acceptable conditions, safe boundaries, bases thereof, and management or administrative controls required to ensure safe operation during receipt of multi-canister overpacks (MCOs) containing spent nuclear fuel. removal of free water from the MCOs using the cold vacuum drying process, and inerting and testing of the MCOs before transport to the Canister Storage Building. Controls required for public safety, significant defense in depth, significant worker safety, and for maintaining radiological and toxicological consequences below risk evaluation guidelines are included.

  18. Final Technical Report: Development of Post?Installation Monitoring Capabilities

    SciTech Connect (OSTI)

    Polagye, Brian [University of Washington] [University of Washington

    2014-03-31T23:59:59.000Z

    The development of approaches to harness marine and hydrokinetic energy at large?scale is predicated on the compatibility of these generation technologies with the marine environment. At present, aspects of this compatibility are uncertain. Demonstration projects provide an opportunity to address these uncertainties in a way that moves the entire industry forward. However, the monitoring capabilities to realize these advances are often under?developed in comparison to the marine and hydrokinetic energy technologies being studied. Public Utility District No. 1 of Snohomish County has proposed to deploy two 6?meter diameter tidal turbines manufactured by OpenHydro in northern Admiralty Inlet, Puget Sound, Washington. The goal of this deployment is to provide information about the environmental, technical, and economic performance of such turbines that can advance the development of larger?scale tidal energy projects, both in the United States and internationally. The objective of this particular project was to develop environmental monitoring plans in collaboration with resource agencies, while simultaneously advancing the capabilities of monitoring technologies to the point that they could be realistically implemented as part of these plans. In this, the District was joined by researchers at the Northwest National Marine Renewable Energy Center at the University of Washington, Sea Mammal Research Unit, LLC, H.T. Harvey & Associates, and Pacific Northwest National Laboratory. Over a two year period, the project team successfully developed four environmental monitoring and mitigation plans that were adopted as a condition of the operating license for the demonstration project that issued by the Federal Energy Regulatory Commission in March 2014. These plans address nearturbine interactions with marine animals, the sound produced by the turbines, marine mammal behavioral changes associated with the turbines, and changes to benthic habitat associated with colonization of the subsea base support structure. In support of these plans, the project team developed and field tested a strobe?illuminated stereooptical camera system suitable for studying near?turbine interactions with marine animals. The camera system underwent short?term field testing at the proposed turbine deployment site and a multi?month endurance test in shallower water to evaluate the effectiveness of biofouling mitigation measures for the optical ports on camera and strobe pressure housings. These tests demonstrated that the camera system is likely to meet the objectives of the near?turbine monitoring plan and operate, without maintenance, for periods of at least three months. The project team also advanced monitoring capabilities related to passive acoustic monitoring of marine mammals and monitoring of tidal currents. These capabilities will be integrated in a recoverable monitoring package that has a single interface point with the OpenHydro turbines, connects to shore power and data via a wet?mate connector, and can be recovered to the surface for maintenance and reconfiguration independent of the turbine. A logical next step would be to integrate these instruments within the package, such that one instrument can trigger the operation of another.

  19. CCSI Risk Estimation: An Application of Expert Elicitation

    SciTech Connect (OSTI)

    Engel, David W.; Dalton, Angela C.

    2012-10-01T23:59:59.000Z

    The Carbon Capture Simulation Initiative (CCSI) is a multi-laboratory simulation-driven effort to develop carbon capture technologies with the goal of accelerating commercialization and adoption in the near future. One of the key CCSI technical challenges is representing and quantifying the inherent uncertainty and risks associated with developing, testing, and deploying the technology in simulated and real operational settings. To address this challenge, the CCSI Element 7 team developed a holistic risk analysis and decision-making framework. The purpose of this report is to document the CCSI Element 7 structured systematic expert elicitation to identify additional risk factors. We review the significance of and established approaches to expert elicitation, describe the CCSI risk elicitation plan and implementation strategies, and conclude by discussing the next steps and highlighting the contribution of risk elicitation toward the achievement of the overarching CCSI objectives.

  20. DuPont Chemical Vapor Technical Report

    SciTech Connect (OSTI)

    MOORE, T.L.

    2003-10-03T23:59:59.000Z

    DuPont Safety Resources was tasked with reviewing the current chemical vapor control practices and providing preventive recommendations on best commercial techniques to control worker exposures. The increased focus of the tank closure project to meet the 2024 Tri-Party Agreement (TPA) milestones has surfaced concerns among some CH2MHill employees and other interested parties. CH2MHill is committed to providing a safe working environment for employees and desires to safely manage the tank farm operations using appropriate control measures. To address worker concerns, CH2MHill has chartered a ''Chemical Vapors Project'' to integrate the activities of multiple CH2MHill project teams, and solicit the expertise of external resources, including an independent Industrial Hygiene expert panel, a communications consultant, and DuPont Safety Resources. Over a three-month time period, DuPont worked with CH2MHill ESH&Q, Industrial Hygiene, Engineering, and the independent expert panel to perform the assessment. The process included overview presentations, formal interviews, informal discussions, documentation review, and literature review. DuPont Safety Resources concluded that it is highly unlikely that workers in the tank farms are exposed to chemicals above established standards. Additionally, the conventional and radiological chemistry is understood, the inherent chemical hazards are known, and the risk associated with chemical vapor exposure is properly managed. The assessment highlighted management's commitment to addressing chemical vapor hazards and controlling the associated risks. Additionally, we found the Industrial Hygiene staff to be technically competent and well motivated. The tank characterization data resides in a comprehensive database containing the tank chemical compositions and relevant airborne concentrations.

  1. Computer Science Department Technical Report

    E-Print Network [OSTI]

    Shahriar, Selim

    questions on querying and attack-resilience of CDDHT are also discussed. #12;Keywords: security, distributed intrusion detection systems, distributed hash table #12;1 Cyber Disease Monitoring with Distributed HashComputer Science Department Technical Report NWU-CS-04-40 July 12, 2004 Cyber Disease Monitoring

  2. Invite Paper Fall Technical Meeting

    E-Print Network [OSTI]

    Gomez, Alessandro

    within which it is sensible to make predictions, combustion is here to stay. In addition to oil1 Invite Paper Fall Technical Meeting of the Eastern States Section of the Combustion Institute: A Laboratory-Scale Benchmark for Turbulent Combustion Studies Alessandro Gomez Department of Mechanical

  3. Technical Note 499 December1990

    E-Print Network [OSTI]

    Technical Note 499 · December1990 Interpretation as Abduction Jerry R. Hobbs, Mark Stickel;Interpretation as Abduction Jerry R. Hobbs, Mark Stickel, Douglas Appelt, and Paul Martin Artificial Intelligence Center SRI International Abstract Abduction is inference to the best explanation. In the TACITUS project

  4. DOE FINAL TECHNICAL REPORT RP

    SciTech Connect (OSTI)

    RUSS PETERMAN

    2012-01-01T23:59:59.000Z

    The City of Georgetown Utility Systems (GUS) patnered with the private sector, the American Public Power Association (APPA) and Southwestern University to design, construct, test and monitor a solar co-generation system directly connected to the GUS electric distribution system. This report consists of the Primary Technical Report and 3 attachments.

  5. Modularized training for technical editors

    SciTech Connect (OSTI)

    Murphy, P.W.

    1988-09-08T23:59:59.000Z

    This paper outlines the editorial services provided at the Lawrence Livermore National Laboratory (LLNL), sketches a syllabus of basic training for technical editors, describes the approach being used to develop this cost-effective individualized instruction for editors (experienced or not) new to work at LLNL, and enumerates the advantages of this approach. 8 refs.

  6. Defense Technical Information Center thesaurus

    SciTech Connect (OSTI)

    Dickert, J.H. [ed.] [comp.

    1996-10-01T23:59:59.000Z

    This DTIC Thesaurus provides a basic multidisciplinary subject term vocabulary used by DTIC to index and retrieve scientific and technical information from its various data bases and to aid DTIC`s users in their information storage and retrieval operations. It includes an alphabetical posting term display, a hierarchy display, and a Keywork Out of Context (KWOC) display.

  7. Facility worker technical basis document

    SciTech Connect (OSTI)

    EVANS, C.B.

    2003-03-21T23:59:59.000Z

    This report documents the technical basis for facility worker safety to support the Tank Farms Documented Safety Analysis and described the criteria and methodology for allocating controls to hazardous conditions with significant facility worker consequences and presents the results of the allocation.

  8. Mechanical Engineering Department technical review

    SciTech Connect (OSTI)

    Carr, R.B.; Abrahamson, L.; Denney, R.M.; Dubois, B.E (eds.) [eds.

    1982-01-01T23:59:59.000Z

    Technical achievements and publication abstracts related to research in the following Divisions of Lawrence Livermore Laboratory are reported in this biannual review: Nuclear Fuel Engineering; Nuclear Explosives Engineering; Weapons Engineering; Energy Systems Engineering; Engineering Sciences; Magnetic Fusion Engineering; and Material Fabrication. (LCL)

  9. Deleware Water Resources Center Annual Technical Report

    E-Print Network [OSTI]

    of best management practices (BMPs) by private businesses, and improved storm water management & wetlandsDeleware Water Resources Center Annual Technical Report FY 2002 Introduction Delaware Water Resources Center Annual Technical Report Introduction and Program Management/Administration Description FY

  10. Biodiesel ASTM Update and Future Technical Needs

    Broader source: Energy.gov (indexed) [DOE]

    ASTM Update and Future Technical Needs Steve Howell Technical Director National Biodiesel Board ASTM Current Status ASTM D6751 is the approved standard for B100 for blending up to...

  11. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-00-1795-S 2. Government Accession No. 3. Distribution Statement No restrictions. This document is available to the public through the National Technical

  12. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-05/0-4485-1 2. Government Accession No. 3 No restrictions. This document is available to the public through the National Technical Information Service

  13. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-00/0-1843-1 2. Government Accession No. 3 No restrictions. This document is available to the public through the National Technical Information Service

  14. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-03/4083-2 2. Government Accession No. 3. This document is available to the public through the National Technical Information Service, Springfield

  15. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Zornberg, Jorge G.

    Technical Report Documentation Page 1. Report No. FHWA/TX-12/5-4829-01-3 2. Government Accession No No restrictions. This document is available to the public through the National Technical Information Service

  16. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-0-1814-1 2. Government Accession No. 3 No restrictions. This document is available to the public through the National Technical Information Service

  17. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Zornberg, Jorge G.

    Technical Report Documentation Page 1. Report No. FHWA/TX-10/0-5812-1 2. Government Accession No. 3. This document is available to the public through the National Technical Information Service, Springfield

  18. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-03-1838-8 2. Government Accession No. 3. Distribution Statement No restrictions. This document is available to the public through the National Technical

  19. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-00/1754-1 2. Government Accession No. 3 No restrictions. This document is available to the public through the National Technical Information Service

  20. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-05/9-580/589-2 2. Government Accession No. Distribution Statement No restrictions. This document is available to the public through the National Technical

  1. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-04/1778-4 2. Government Accession No. 3 No restrictions. This document is available to the public through the National Technical Information Service

  2. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-04/0-1734-S 2. Government Accession No. 3 No restrictions. This document is available to the public through the National Technical Information Service

  3. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-11/0-6348-1 2. Government Accession No. 3. Distribution Statement No restrictions. This document is available to the public through the National Technical

  4. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-00/1785-2 2. Government Accession No. 3 No restrictions. This document is available to the public through the National Technical Information Service

  5. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-03/4386-1 2. Government Accession No. 3. Distribution Statement No restrictions. This document is available to the public through the National Technical

  6. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-06/0-4085-5 2. Government Accession No. 3. Distribution Statement No restrictions. This document is available to the public through the National Technical

  7. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-06/0-1401-2 2. Government Accession No. 3. Distribution Statement No restrictions. This document is available to the public through the National Technical

  8. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-10/0-5974-1 2. Government Accession No. 3. Distribution Statement No restrictions. This document is available to the public through the National Technical

  9. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-04/0-1471-4 2. Government Accession No. 3. Distribution Statement No restrictions. This document is available to the public through the National Technical

  10. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-0-1748-2 2. Government Accession No. 3. This document is available to the public through the National Technical Information Service, Springfield

  11. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-04/0-4808-1 2. Government Accession No. 3. This document is available to the public through the National Technical Information Service, Springfield

  12. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-04/5-3933-01-P1-4 2. Government Accession No restrictions. This document is available to the public through the National Technical Information Service

  13. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-06/0-4437-1 2. Government Accession No. 3. This document is available to the public through the National Technical Information Service, Springfield

  14. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-06/5-4975-01-1 2. Government Accession No. This document is available to the public through the National Technical Information Service, Springfield

  15. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-06/0-4185-4 2. Government Accession No. 3. This document is available to the public through the National Technical Information Service, Springfield

  16. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-06/0-4958-1 2. Government Accession No. 3 No restrictions. This document is available to the public through the National Technical Information Service

  17. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-11/0-6095-2 2. Government Accession No. 3 Statement No restrictions. This document is available to the public through the National Technical

  18. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-07/0-1700-7 2. Government Accession No. 3. Distribution Statement No restrictions. This document is available to the public through the National Technical

  19. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-07/0-5410-1 2. Government Accession No. 3 No restrictions. This document is available to the public through the National Technical Information Service

  20. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-05/0-4661-1 2. Government Accession No. 3. This document is available to the public through the National Technical Information Service, Springfield

  1. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-04/0-1700-1 2. Government Accession No. 3. Distribution Statement No restrictions. This document is available to the public through the National Technical

  2. PRELIMINARY REVIEW COPY Technical Report Documentation Page

    E-Print Network [OSTI]

    Zornberg, Jorge G.

    PRELIMINARY REVIEW COPY Technical Report Documentation Page 1. Report No. FHWA/TX-13/0-6603-2 2 No restrictions. This document is available to the public through the National Technical Information Service

  3. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-04/4576-3 2. Government Accession No. 3 Statement No restrictions. This document is available to the public through the National Technical

  4. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-09/0-5799-1 2. Government Accession No. 3 Statement No restrictions. This document is available to the public through the National Technical

  5. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-7-4957-1 2. Government Accession No. 3 No restrictions. This document is available to the public through the National Technical Information Service

  6. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-05/0-4416-1 2. Government Accession No. 3 No restrictions. This document is available to the public through the National Technical Information Service

  7. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-07/0-1895-1 2. Government Accession No. 3. Distribution Statement No restrictions. This document is available to the public through the National Technical

  8. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-0-2129-1 2. Government Accession No. 3. Distribution Statement No restrictions. This document is available to the public through the National Technical

  9. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-07/0-5068-2 2. Government Accession No. 3 No restrictions. This document is available to the public through the National Technical Information Service

  10. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-05/0-4410-2 2. Government Accession No. 3. Distribution Statement No restrictions. This document is available to the public through the National Technical

  11. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-09/0-5830-1 2. Government Accession No. 3 No restrictions. This document is available to the public through the National Technical Information Service

  12. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-05/0-4069-1 2. Government Accession No. 3. This document is available to the public through the National Technical Information Service, Springfield

  13. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. 9-572-1 2. Government Accession No. 3. Recipient Statement No restrictions. This document is available to the public through the National Technical

  14. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-06/0-4661-2 2. Government Accession No. 3. Distribution Statement No restrictions. This document is available to the public through the National Technical

  15. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-05/0-1713-1 2. Government Accession No. 3 No restrictions. This document is available to the public through the National Technical Information Service

  16. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Zornberg, Jorge G.

    Technical Report Documentation Page 1. Report No. FHWA/TX-07/0-5202-2 2. Government Accession No. 3 No restrictions. This document is available to the public through the National Technical Information Service

  17. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-05/0-4185-3 2. Government Accession No. 3 Statement No restrictions. This document is available to the public through the National Technical

  18. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-10/0-5973-2 2. Government Accession No. 3. Distribution Statement No restrictions. This document is available to the public through the National Technical

  19. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Zornberg, Jorge G.

    Technical Report Documentation Page 1. Report No. FHWA/TX-13/5-4829-01-2 2. Government Accession No. This document is available to the public through the National Technical Information Service, Springfield

  20. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-05/0-1713-2 2. Government Accession No. 3. Distribution Statement No restrictions. This document is available to the public through the National Technical

  1. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-07/0-5176-2 2. Government Accession No. 3. Distribution Statement No restrictions. This document is available to the public through the National Technical

  2. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-05/5-1924-01-1 2. Government Accession No No restrictions. This document is available to the public through the National Technical Information Service

  3. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-09/0-5668-1 2. Government Accession No. 3. Distribution Statement No restrictions. This document is available to the public through the National Technical

  4. Final Technical Report

    SciTech Connect (OSTI)

    Shayya, Walid

    2007-03-20T23:59:59.000Z

    The state of New York through the New York State Energy Research and Development Authority (NYSERDA) has developed a suite of digester projects throughout the state to assess the potential for anaerobic digestion systems to improve manure management and concurrently produce energy through the production of heat and electrical power using the biogas produced from the digesters. Dairies comprise a significant part of the agribusiness and economy of the state of New York. Improving the energy efficiency and environmental footprint of dairies is a goal of NYSERDA. SUNY Morrisville State College (MSC) is part of a collection of state universities, dairy farms, cooperatives, and municipalities examining anaerobic digestion systems to achieve the goals of NYSERDA, the improvement of manure management, and reducing emissions to local dairy animal sites. The process for siting a digester system at the MSC’s free-stall Dairy Complex was initiated in 2002. The project involved the construction of an anaerobic digester that can accommodate the organic waste generated at Dairy complex located about a mile southeast of the main campus. Support for the project was provided through funding from the New York State Energy Research and Development Authority (NYSERDA) and the New York State Department of Agriculture and Markets. The DOE contribution to the project provided additional resources to construct an expanded facility to handle waste generated from the existing free-stall dairy and the newly-constructed barns. Construction on the project was completed in 2006 and the production of biogas started soon after the tanks were filled with the effluent generated at the Dairy Complex. The system has been in operation since December 17, 2006. The generated biogas was consistently flared starting from December 20, 2006, and until the operation of the internal combustion engine/generator set were first tested on the 9th of January, 2007. Flaring the biogas continued until the interconnect with the power grid was approved by NYSEG (the electrical power provider) and the combined heat and power generation (CHP) system was authorized to start on February 27, 2007. The system has been in operation since February 28, 2007, and is generating 45 to 50 kW of electrical power on continuous basis. The completed project will ultimately allow for investigating the facility of utilizing organic waste from a dairy operation in a hard-top plug-flow methane digester with the ultimate goal of reducing environmental risk, increasing economic benefits, and demonstrating the viability of an anaerobic methane digestion system. Many benefits are expected as a result of the completed project including our better understanding of the anaerobic digestion process and its management as well as the facility to utilize the methane digester as a demonstration site for dairy producers, farmers, and organic waste producers in New York State and the Northeast. Additional benefits include helping current and future students in dairy science and technology, agricultural business, environmental sciences, agricultural engineering, and other disciplines develop better understanding of underutilized biomass alternative energy technologies, environmental conservation, environmental stewardship, and sustainable agriculture.

  5. Space Conditioning Standing Technical Committee Strategic Plan

    Broader source: Energy.gov [DOE]

    This strategic plan document outlines the gaps, barriers, and opportunities identified by the Building America Space Conditioning Standing Technical Committee.

  6. Supporting Technical Documents | Department of Energy

    Office of Environmental Management (EM)

    Environmental Department (NMED) Los Alamos National Laboratory (LANL) Hazardous Waste Facility Permit Supporting Technical Document for the Radiological Release Accident...

  7. UNITED STATES NUCLEAR WASTE TECHNICAL REVIEW BOARD

    E-Print Network [OSTI]

    UNITED STATES NUCLEAR WASTE TECHNICAL REVIEW BOARD 2300 Clarendon Boulevard, Suite 1300 Arlington are pleased to transmit a technical report prepared by the Nuclear Waste Technical Review Board (Board. Based on its review of data gathered by the DOE and the Center for Nuclear Waste Regulatory Analyses

  8. Effective Community-Wide Policy Technical Assistance

    E-Print Network [OSTI]

    Effective Community-Wide Policy Technical Assistance: The DOE/NREL Approach NREL is a national: The DOE/NREL Approach Effective Community-Wide Policy Technical Assistance: The DOE/NREL Approach HelpingVoss, Sarah Busche, Eric Lantz, Lynn Billman, and Dan Beckley. The layout and technical editing were

  9. Risk Communication - HPMC Occupational Health Services

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's PossibleRadiation Protection TechnicalResonantNovember 15 to March 15A MegawattElectricity:Risk

  10. Risk-based evaluation of Allowed Outage Times (AOTs) considering risk of shutdown

    SciTech Connect (OSTI)

    Mankamo, T. [Avaplan Oy, Espoo (Finland); Kim, I.S.; Samanta, P.K. [Brookhaven National Lab., Upton, NY (United States)

    1992-12-31T23:59:59.000Z

    When safety systems fail during power operation, Technical Specifications (TS) usually limit the repair within Allowed Outage Time (AOT). If the repair cannot be completed within the AOT, or no AOT is allowed, the plant is required to be shut down for the repair. However, if the capability to remove decay heat is degraded, shutting down the plant with the need to operate the affected decay-heat removal systems may impose a substantial risk compared to continued power operation over a usual repair time. Thus, defining a proper AOT in such situations can be considered as a risk-comparison between the repair in frill power state with a temporarily increased level of risk, and the altemative of shutting down the plant for the repair in zero power state with a specific associated risk. The methodology of the risk-comparison approach, with a due consideration of the shutdown risk, has been further developed and applied to the AOT considerations of residual heat removal and standby service water systems of a boiling water reactor (BWR) plant. Based on the completed work, several improvements to the TS requirements for the systems studied can be suggested.

  11. Risk-based evaluation of Allowed Outage Times (AOTs) considering risk of shutdown

    SciTech Connect (OSTI)

    Mankamo, T. (Avaplan Oy, Espoo (Finland)); Kim, I.S.; Samanta, P.K. (Brookhaven National Lab., Upton, NY (United States))

    1992-01-01T23:59:59.000Z

    When safety systems fail during power operation, Technical Specifications (TS) usually limit the repair within Allowed Outage Time (AOT). If the repair cannot be completed within the AOT, or no AOT is allowed, the plant is required to be shut down for the repair. However, if the capability to remove decay heat is degraded, shutting down the plant with the need to operate the affected decay-heat removal systems may impose a substantial risk compared to continued power operation over a usual repair time. Thus, defining a proper AOT in such situations can be considered as a risk-comparison between the repair in frill power state with a temporarily increased level of risk, and the altemative of shutting down the plant for the repair in zero power state with a specific associated risk. The methodology of the risk-comparison approach, with a due consideration of the shutdown risk, has been further developed and applied to the AOT considerations of residual heat removal and standby service water systems of a boiling water reactor (BWR) plant. Based on the completed work, several improvements to the TS requirements for the systems studied can be suggested.

  12. Rangeland Risk Management for Texans: Types of Risk

    E-Print Network [OSTI]

    White, Larry D.; Hanselka, C. Wayne

    2000-11-01T23:59:59.000Z

    Types of risk associated with range ecosystems include climatic, biological, financial and political risks. These risks are explained so that managers can know how to handle them....

  13. Risk Dynamics?An Analysis for the Risk of Change

    E-Print Network [OSTI]

    Huang, Tailin

    2010-01-01T23:59:59.000Z

    Bookstaber, R. (1999). "Risk Management in ComplexG. E. (2004). "How Useful Is Quantitative Risk Assessment?"Risk Analysis, Aubrey, A. (2010). "Preventing Diabetes:

  14. Finance and Risk & ENGINEERING

    E-Print Network [OSTI]

    Aronov, Boris

    Finance and Risk & ENGINEERING Charles S. Tapiero Department Head and Morton and Angela Topfer · Corporate Finance and Financial Markets · Computational Finance · Risk Finance · Technology and Algorithmic Finance A Collective Leadership Students participation #12;RESEARCH STRENGTHS · Black Swans and Fragility

  15. Linac4 Technical Design Report

    E-Print Network [OSTI]

    Arnaudon, L; Baylac, M; Bellodi, G; Body, Y; Borburgh, J; Bourquin, P; Broere, J; Brunner, O; Bruno, L; Carli, C; Caspers, Friedhelm; Cousineau, S M; Cuvet, Y; De Almeida Martins, C; Dobers, T; Fowler, T; Garoby, R; Gerigk, F; Goddard, B; Hanke, K; Hori, M; Jones, M; Kahle, K; Kalbreier, Willi; Kroyer, T; Küchler, D; Lombardi, A M; López-Hernandez, L A; Magistris, M; Martini, M; Maury, S; Page, E; Paoluzzi, M; Pasini, M; Raich, U; Rossi, C; Royer, J P; Sargsyan, E; Serrano, J; Scrivens, R; Silari, M; Timmins, M; Venturini-Delsolaro, W; Vretenar, M; Wegner, R; Weterings, W; Zickler, T

    2006-01-01T23:59:59.000Z

    Linac4 is an H- linear accelerator, intended to replace Linac2 as injector to the PS Booster (PSB). By delivering to the PSB a beam at 160 MeV energy, Linac4 will provide the conditions to double the brightness and intensity of the beam from the PSB, thus removing the first bottleneck towards higher brightness for the LHC and simplifying operation. Moreover, this new linac constitutes an essential component of any of the envisaged LHC upgrade scenarios and could open the way to future extensions of the CERN accelerator complex towards higher performance. This Technical Design Report presents a detailed technical overview of the Linac4 design as it stands at end 2006.

  16. Needs for Risk Informing Environmental Cleanup Decision Making - 13613

    SciTech Connect (OSTI)

    Zhu, Ming; Moorer, Richard [U.S. Department of Energy, Washington, DC 20585 (United States)] [U.S. Department of Energy, Washington, DC 20585 (United States)

    2013-07-01T23:59:59.000Z

    This paper discusses the needs for risk informing decision making by the U.S. Department of Energy (DOE) Office of Environmental Management (EM). The mission of the DOE EM is to complete the safe cleanup of the environmental legacy brought about from the nation's five decades of nuclear weapons development and production and nuclear energy research. This work represents some of the most technically challenging and complex cleanup efforts in the world and is projected to require the investment of billions of dollars and several decades to complete. Quantitative assessments of health and environmental risks play an important role in work prioritization and cleanup decisions of these challenging environmental cleanup and closure projects. The risk assessments often involve evaluation of performance of integrated engineered barriers and natural systems over a period of hundreds to thousands of years, when subject to complex geo-environmental transformation processes resulting from remediation and disposal actions. The requirement of resource investments for the cleanup efforts and the associated technical challenges have subjected the EM program to continuous scrutiny by oversight entities. Recent DOE reviews recommended application of a risk-informed approach throughout the EM complex for improved targeting of resources. The idea behind this recommendation is that by using risk-informed approaches to prioritize work scope, the available resources can be best utilized to reduce environmental and health risks across the EM complex, while maintaining the momentum of the overall EM cleanup program at a sustainable level. In response to these recommendations, EM is re-examining its work portfolio and key decision making with risk insights for the major sites. This paper summarizes the review findings and recommendations from the DOE internal reviews, discusses the needs for risk informing the EM portfolio and makes an attempt to identify topics for R and D in integrated risk assessment that could assist in the EM prioritization efforts. (authors)

  17. FACILITY WORKER TECHNICAL BASIS DOCUMENT

    SciTech Connect (OSTI)

    SHULTZ, M.V.

    2005-03-31T23:59:59.000Z

    This technical basis document was developed to support RPP-13033, ''Tank Farms Documented Safety Analysis (DSA). It describes the criteria and methodology for allocating controls to hazardous conditions with significant facility worker (FW) consequence and presents the results of the allocation. The criteria and methodology for identifying controls that address FW safety are in accordance with DOE-STD-3009-94, ''Preparation Guide for US Department of Energy Nonreactor Nuclear Facility Documented Safety Analyses''.

  18. Technical Assistance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuels Data Center HomeIdle ReductionOffices Offices AllFeeds RSSSustainableTechnical

  19. Sandia Energy - Security Risk Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Security Risk Assessment Home Climate & Earth Systems WaterEnergy Nexus Water Monitoring & Treatment Technology Security Risk Assessment Security Risk Assessmentcwdd2015-05-04T21:...

  20. Subjective Risk, Confidence, and Ambiguity

    E-Print Network [OSTI]

    Traeger, Christian P.

    2011-01-01T23:59:59.000Z

    Paper 1103) Subjective Risk, Confidence, and Ambiguityby author(s). Subjective Risk, Con?dence, and Ambiguity ?567. Ellsberg, D. (1961), ‘Risk, ambiguity and the savage

  1. Essays in time and risk

    E-Print Network [OSTI]

    Sprenger, Charles

    2011-01-01T23:59:59.000Z

    4.4.1 Risk Attitudes . . . . . . . . . . . . . . . . .3.3.1 Additional Risk Preference Measures . . . . . . . .An Endowment Effect for Risk: Experimental Tests of

  2. Learning and risk aversion

    E-Print Network [OSTI]

    Oyarzun, Carlos

    2009-06-02T23:59:59.000Z

    This dissertation contains three essays on learning and risk aversion. In the first essay we consider how learning may lead to risk averse behavior. A learning rule is said to be risk averse if it is expected to add more probability to an action...

  3. Livestock Risk Protection

    E-Print Network [OSTI]

    Thompson, Bill; Bennett, Blake; Jones, Diana

    2008-10-21T23:59:59.000Z

    risk insurance with an ending date of coverage that meets their risk management objectives. Feeder cattle producers may want the end date of coverage to match the William Thompson, Blake Bennett and DeDe Jones* Figure 1: Livestock Risk Protection...

  4. Technical basis document for the unplanned excavation/drilling of 200 area soils

    SciTech Connect (OSTI)

    STEPHENS, L.S.

    2003-03-21T23:59:59.000Z

    This technical basis document was developed to support the Tank Farms Documented Safety Analysis (DSA) and describes the risk binning process and the technical basis for assigning risk bins for the unplanned excavation/drilling of 200 Area soils representative accident and associated represented hazardous conditions. The purpose of the risk binning process is to determine the need for safety-significant structures, systems, and components (SSC) and/or technical safety requirement (TSR)-level controls for a given representative accident or represented hazardous conditions based on an evaluation of the frequency and consequence. Note that the risk binning process is not applied to facility workers, because all facility worker hazardous conditions are considered for safety-significant SSCs and/or TSR-level controls. Determination of the need for safety-class SSCs was performed in accordance with DOE-STD-3009-94, Preparation Guide for US. Department of Energy Nonreactor Nuclear Facility Documented Safety Analyses, as described in this report.

  5. International Linear Collider-A Technical Progress Report

    SciTech Connect (OSTI)

    Elsen, Eckhard; /DESY; Harrison, Mike; /Brookhaven; Hesla, Leah; /Fermilab; Ross, Marc; /Fermilab; Royole-Degieux, Perrine; /Paris, IN2P3; Takahashi, Rika; /KEK, Tsukuba; Walker, Nicholas; /DESY; Warmbein, Barbara; /DESY; Yamamoto, Akira; /KEK, Tsukuba; Yokoya, Kaoru; /KEK, Tsukuba; Zhang, Min; /Beijing, Inst. High Energy Phys.

    2011-11-04T23:59:59.000Z

    The International Linear Collider: A Technical Progress Report marks the halfway point towards the Global Design Effort fulfilling its mandate to follow up the ILC Reference Design Report with a more optimised Technical Design Report (TDR) by the end of 2012. The TDR will be based on much of the work reported here and will contain all the elements needed to propose the ILC to collaborating governments, including a technical design and implementation plan that are realistic and have been better optimised for performance, cost and risk. We are on track to develop detailed plans for the ILC, such that once results from the Large Hadron Collider (LHC) at CERN establish the main science goals and parameters of the next machine, we will be in good position to make a strong proposal for this new major global project in particle physics. The two overriding issues for the ILC R&D programme are to demonstrate that the technical requirements for the accelerator are achievable with practical technologies, and that the ambitious physics goals can be addressed by realistic ILC detectors. This GDE interim report documents the impressive progress on the accelerator technologies that can make the ILC a reality. It highlights results of the technological demonstrations that are giving the community increased confidence that we will be ready to proceed with an ILC project following the TDR. The companion detector and physics report document likewise demonstrates how detector designs can meet the ambitious and detailed physics goals set out by the ILC Steering Committee. LHC results will likely affect the requirements for the machine design and the detectors, and we are monitoring that very closely, intending to adapt our design as those results become available.

  6. Risk & QualityRisk & Quality ManagementManagement

    E-Print Network [OSTI]

    liability."" [Balsaono RR, Brown[Balsaono RR, Brown MK, Risk ManagementMK, Risk Management inin Legal

  7. Technical Report Confirms Reliability of Yucca Mountain Technical Work |

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Siteof Energy 2, 2015 - January 16,Administrative Forms TechnicalDepartment of Energy

  8. ALLOCATING VENDOR RISKS IN THE HANFORD WASTE CLEANUP

    SciTech Connect (OSTI)

    Keisler, Jeff M.; Buehring, William A.; McLaughlin, Peter D.; Robershotte, Mark A.; Whitfield, Ronald G.

    2004-05-15T23:59:59.000Z

    Organizations may view outsourcing as a way to eliminate risk. This application uses a decision analytic approach to determine which risks can be shared or shifted to vendors and which ones should be borne by the buyer. In this case, we found that allocating risks incorrectly could increase costs dramatically. This approach was used to develop the Request for Proposals (RFP) for the U.S. Department of Energy's (DOE's) privatization initiative for the Hanford Tank Waste Remediation System (TWRS). We describe this application and summarize technical and organizational lessons learned in the years following. The model used an assessment protocol to predict how vendors would react to proposed risk allocations in terms of their actions and their pricing.

  9. Assumptions to the Annual Energy Outlook 2013

    Gasoline and Diesel Fuel Update (EIA)

    assumptions regarding technically recoverable oil resources. Inputs to these resource estimates include the USGS World Petroleum Assessment of 2000 and oil reserves...

  10. International Energy Module

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    assumptions regarding technically recoverable oil resources. Inputs to these resource estimates include the USGS World Petroleum Assessment of 2000 and oil reserves...

  11. U.S. Energy Information Administration (EIA) - Sector

    Gasoline and Diesel Fuel Update (EIA)

    unproved technically recoverable tight oil resources as of January 1, 2010 BasinPlay Area (square miles) Average well spacing (wells per square mile) Percent of area untested...

  12. Mapping and Assessment of the United States Ocean Wave Energy...

    Open Energy Info (EERE)

    Mapping and Assessment of the United States Ocean Wave Energy Resource This project estimates the naturally available and technically recoverable U.S. wave energy resources, using...

  13. Press Room - Press Releases - U.S. Energy Information Administration...

    Gasoline and Diesel Fuel Update (EIA)

    developing shale gas plays, estimates of technically recoverable resources and well productivity remain highly uncertain. Over the past decade, as more shale formations have gone...

  14. Treatment of Passive Component Reliability in Risk-Informed Safety Margin Characterization FY 2010 Report

    SciTech Connect (OSTI)

    Robert W Youngblood

    2010-09-01T23:59:59.000Z

    The Risk-Informed Safety Margin Characterization (RISMC) pathway is a set of activities defined under the U.S. Department of Energy (DOE) Light Water Reactor Sustainability Program. The overarching objective of RISMC is to support plant life-extension decision-making by providing a state-of-knowledge characterization of safety margins in key systems, structures, and components (SSCs). A technical challenge at the core of this effort is to establish the conceptual and technical feasibility of analyzing safety margin in a risk-informed way, which, unlike conventionally defined deterministic margin analysis, is founded on probabilistic characterizations of SSC performance.

  15. Final Scientific/Technical Report

    SciTech Connect (OSTI)

    Dr. Michael Strasik

    2007-06-29T23:59:59.000Z

    Boeing Phantom Works and its team originally proposed a three-year Phase III SPI project to develop a 30-kWh flywheel with a 100 kW power capability as a power risk management system (RMS) for power users and providers. The chief objectives for the Risk Management System Flywheel were to (1) demonstrate its ability to protect a critical load such as a small data center from swings in power availability, cost, and power factor and (2) show that the RMS flywheel can perform these functions with reduced noise, emissions, and operating costs when compared with non-HTS competitors including batteries, diesel generators, and microturbines.

  16. Risk Policy and Risk Management Procedures The University's Risk Policy sets out The University's approach to risk and its

    E-Print Network [OSTI]

    Aickelin, Uwe

    Risk Policy and Risk Management Procedures Preface The University's Risk Policy sets out The University's approach to risk and its management together with the means for identifying, analysing and managing risk in order to minimise its frequency and impact. The risks considered significant

  17. Professional Certificate in Risk Management

    E-Print Network [OSTI]

    Carleton University

    Professional Certificate in Risk Management 2010 Program 3 Part-time Courses CRM01: Essentials of Risk Management ­ Next Session Fall 2010 CRM02: Risk Control ­ Jan. 12 - April 26, 2010 CRM03: Risk to apply for the Canadian Risk Management (CRM) designation. #12;Professional Certificate in Risk

  18. Hanford safety analysis and risk assessment handbook (SARAH)

    SciTech Connect (OSTI)

    GARVIN, L.J.

    2003-01-20T23:59:59.000Z

    The purpose of the Hanford Safety Analysis and Risk Assessment Handbook (SARAH) is to support the development of safety basis documentation for Hazard Category 1,2, and 3 U.S. Department of Energy (DOE) nuclear facilities. SARAH describes currently acceptable methodology for development of a Documented Safety Analysis (DSA) and derivation of technical safety requirements (TSR) based on 10 CFR 830, ''Nuclear Safety Management,'' Subpart B, ''Safety Basis Requirements,'' and provides data to ensure consistency in approach.

  19. Scientific and Technical Information Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-04-09T23:59:59.000Z

    To establish Department of Energy (DOE) requirements and responsibilities to ensure that scientific and technical information (STI) is identified, processed, disseminated, and preserved in a manner that (a) enables the scientific community and the public to locate and use the unclassified and unlimited STI resulting from DOE's research and related endeavors and (b) ensures access to classified and sensitive unclassified STI is protected according to legal or Departmental requirements. Cancels DOE O 241.1. Canceled by DOE O 241.1A Chg 1.

  20. PVWatts Version 1 Technical Reference

    SciTech Connect (OSTI)

    Dobos, A. P.

    2013-10-01T23:59:59.000Z

    The NREL PVWatts(TM) calculator is a web application developed by the National Renewable Energy Laboratory (NREL) that estimates the electricity production of a grid-connected photovoltaic system based on a few simple inputs. PVWatts combines a number of sub-models to predict overall system performance, and makes several hidden assumptions about performance parameters. This technical reference details the individual sub-models, documents assumptions and hidden parameters, and explains the sequence of calculations that yield the final system performance estimation.

  1. Technical Assistance | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed offOCHCO Overview OCHCOSystems Analysis Success Stories SystemsTara Trujillo AboutTechnical

  2. Technical Assistance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the.pdfBreakingMayDepartment ofEnergyTeam Cumberland » TeamTechnical Assistance

  3. SAM Photovoltaic Model Technical Reference

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's PossibleRadiation Protection TechnicalResonantNovember 15Rotary FiringRobertSAC HomePastSAM

  4. Report Back from Technical Editor

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's PossibleRadiation Protection Technical s o Freiberge s 3 % A PB 2 7 7 2 x> - ^Rep.LANSv_^ '

  5. Technical Reports | ornl.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of ScienceandMesa del SolStrengthening a solidSynthesis of 2D AlloysTrails News Home |21-6-9Technical

  6. TECHNICAL ADVANCEMENTS AND ISSUES ASSOCIATED WITH

    E-Print Network [OSTI]

    of Energy United States Nuclear Waste Technical Review Board #12;#12;U.S. Nuclear Waste Technical Review in the report are those of the Board and not necessarily those of the reviewers. #12;U.S. NUCLEAr WASTE TECh.D., P.E. Duke University Durham, North Carolina #12;NUCLEAr WASTE TEChNiCAL rEviEW BOArD STAff EXECUTIVE

  7. Technical Qualification Program Description - Integrated Support...

    Broader source: Energy.gov (indexed) [DOE]

    to begin the 18 month qualification period). Technical Qualification Program Description Revision 2, November 2010 5 The position's inclusion in the TQP is: * Specified in the PD...

  8. Technical Position, Regarding Acceptable Methods for Assessing...

    Office of Environmental Management (EM)

    Regarding Acceptable Methods for Assessing and Recording Radiation Doses to Individuals Technical Position, Regarding Acceptable Methods for Assessing and Recording Radiation Doses...

  9. Dampers for Natural Draft Heaters: Technical Report

    E-Print Network [OSTI]

    Lutz, James D.

    2009-01-01T23:59:59.000Z

    Oil? Fired Residential Water Heaters. Berkeley Heights, Newof Residential Gas Water Heaters. Chicago, IL, Gas ApplianceDampers for Natural Draft Water Heaters: Technical Report.

  10. Technical Consultant Contract | Department of Energy

    Energy Savers [EERE]

    Program (STEP). C3c Technical Consultant Contract.pdf More Documents & Publications Communication Consultant Contract Communications Consultant RFP Loan Loss Reserve Agreement...

  11. APPA Engineering and Operations Technical Conference

    Office of Energy Efficiency and Renewable Energy (EERE)

    The 2014 APPA Engineering and Operations Technical Conference is designed for public power professionals charged with designing, developing, and maintaining the nation's electric system.

  12. Space Conditioning Standing Technical Committee Strategic Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Committee Strategic Plan Space Conditioning Standing Technical Committee Strategic Plan This strategic plan document outlines the gaps, barriers, and opportunities identified by...

  13. TR-003 Ecology March 2000 Technical Report

    E-Print Network [OSTI]

    TR-003 Ecology March 2000 Technical Report Research Disciplines: Ecology ~ Geology ~ Geomorphology: Ecology ~ Geology ~ Geomorphology ~ Hydrology ~ Pedology ~ Silviculture ~ Wildlife CONTENTS ABSTRACT

  14. Technical Standards, Program Project Justification Statement...

    Energy Savers [EERE]

    Standards, Program Project Justification Statement - August 29, 2012 August 29, 2012 DOE Technical Standards Program Project Justification Statement As part of the new...

  15. FAQS Reference Guide – General Technical Base

    Broader source: Energy.gov [DOE]

    This reference guide addresses the competency statements in the December 2007 edition of DOE-STD-1146-2007, General Technical Base Functional Area Qualification Standard.

  16. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. 1732-S 2. Government Accession No. 3. Recipients, geometric design, entrance ramps, exit ramps 18. Distribution Statement No restrictions. This document

  17. PRELIMINARY REVIEW COPY Technical Report Documentation Page

    E-Print Network [OSTI]

    Texas at Austin, University of

    PRELIMINARY REVIEW COPY Technical Report Documentation Page 1. Report No. 2941-3 Preliminary Review, long-term monitoring 18. Distribution Statement No restrictions. This document is available

  18. Estimating radiogenic cancer risks

    SciTech Connect (OSTI)

    NONE

    1994-06-01T23:59:59.000Z

    This document presents a revised methodology for EPA`s estimation of cancer risks due to low-LET radiation exposures in light of information that has become available since the publication of BIER III, especially new information on the Japanese atomic bomb survivors. For most cancer sites, the risk model is one in which the age-specific relative risk coefficients are obtained by taking the geometric mean of coefficients derived from the atomic bomb survivor data employing two different methods for transporting risks from Japan to the U.S. (multiplicative and NIH projection methods). Using 1980 U.S. vital statistics, the risk models are applied to estimate organ-specific risks, per unit dose, for a stationary population.

  19. Soladigm DOE Final Technical Report

    SciTech Connect (OSTI)

    None

    2011-12-31T23:59:59.000Z

    Soladigm's research has produced a fundamental improvement in the technology for dynamic windows by successfully transitioning a low-cost, high-performance dynamic glass fabrication process from a simple 2" research prototype into a full-scale manufacturing environment capable of producing commercial dynamic insulated glass units (IGUs), and developing and optimizing the production process to meet all specifications for mass commercial production. The technology developed under this project is a revolutionary process for fabricating electrochromic glass that today exceeds DOE's 2020 performance and reliability targets at a compelling consumer price point. Before this project, we had demonstrated 2" prototypes using our deposition process that met these performance targets. The goal of this project was to prove that we could transition this lab-scale process to a scalable, "inline" manufacturing process, leveraging existing manufacturing tools capable of achieving a commercially attractive pricepoint in the near-term. Under this project we demonstrated the technical effectiveness of our manufacturing process by achieving or exceeding all of our technical and performance targets for inline fabrication of electrochromic IGUs. These performance specifications exceed DOE's 2020 performance and reliability targets. We also demonstrated the economic feasibility of our manufacturing process by reaching an initial production process that will achieve our target costs, which are compatible with mass adoption.

  20. Conditional Risk Mappings

    E-Print Network [OSTI]

    Megiddo

    2006-09-30T23:59:59.000Z

    Key words: Risk; Conjugate Duality; Stochastic Optimization; Dynamic ... MSC2000 Subject Classification: Primary: 90C15,90C48; Secondary: 91B30,

  1. Roadmap: Technical and Applied Studies NonprofitHuman Services Bachelor of Technical and Applied Studies

    E-Print Network [OSTI]

    Sheridan, Scott

    Roadmap: Technical and Applied Studies ­ Nonprofit­Human Services ­ Bachelor of Technical-Aug-12/TET This roadmap is a recommended semester-by-semester plan of study for this major. However / SOC 32570 COMM 35864, COMT 36318 or Visit www.kent.edu/catalog/elr 2.000 2.000 #12;Roadmap: Technical

  2. Environmental effects of dredging technical notes. Assessment of the genotoxic potential of dredged material. Technical notes

    SciTech Connect (OSTI)

    NONE

    1996-08-01T23:59:59.000Z

    This technical note describes an approach for assessing the genotoxic potential of dredged material. The use of integrated batteries of rapid and mechanistically interpretable in vitro and in vivo assays in a tiered approach is fundamental to applied toxicology. The research described here brings this approach to the testing of sediments. Work completed to date and future work will mesh to form an advanced and cost-effective methodology. The purpose of this methodology is to increase the accuracy of environmental risk assessments and facilitate making decisions concerning open-water disposal of dredged material. A great number of the contaminants typically found in dredged material are toxic to exposed organisms through effects on DNA. Such effects are usually the result of low-level chronic exposures. These effects can result in reproductive failure of organisms, impaired growth and development of offspring, and tumors (often cancerous) in vertebrates. Collectively, such effects are called `genotoxicity` and result from damage to the genome of a cell. The damage is heritable, that is, passed on to future cell generations upon duplication of the affected cells.

  3. Technical support services to assist the Office of Environmental Audit in conducting the DOE Environmental Survey and to provide technical assistance on Environmental Compliance issues. Technical progress report, August 14, 1990--February 15, 1991

    SciTech Connect (OSTI)

    NONE

    1995-07-01T23:59:59.000Z

    NUS received authorization from DOE on August 14, 1987 to provide technical support services to assist the Office of Environmental Audit (OEV) in conducting the DOE Environmental Survey and to provide technical assistance on environmental compliance issues. The overall contract is to accomplish a one-time, no-fault baseline Survey of all DOE operating facilities, and to provide technical assistance and support for the resolution of environmental compliance issues. NUS has completed the Preliminary Reports and continues to support DOE on the Prioritization and Tiger Team Assessment efforts. The project requires a broad range of environmental protection expertise, necessitating senior-level personnel as the primary project staff. Many of the tasks assigned by DOE require quick startup and performance, and several tasks may be active at any one time. The objective of the DOE Environmental Survey Program is to identify and prioritize areas of existing environmental risk at 36 DOE facilities. NUS`role is to technically assist the Office of Environmental Audit in the implementation of the Surveys.

  4. Conceptual Model of Offshore Wind Environmental Risk Evaluation System

    SciTech Connect (OSTI)

    Anderson, Richard M.; Copping, Andrea E.; Van Cleve, Frances B.; Unwin, Stephen D.; Hamilton, Erin L.

    2010-06-01T23:59:59.000Z

    In this report we describe the development of the Environmental Risk Evaluation System (ERES), a risk-informed analytical process for estimating the environmental risks associated with the construction and operation of offshore wind energy generation projects. The development of ERES for offshore wind is closely allied to a concurrent process undertaken to examine environmental effects of marine and hydrokinetic (MHK) energy generation, although specific risk-relevant attributes will differ between the MHK and offshore wind domains. During FY10, a conceptual design of ERES for offshore wind will be developed. The offshore wind ERES mockup described in this report will provide a preview of the functionality of a fully developed risk evaluation system that will use risk assessment techniques to determine priority stressors on aquatic organisms and environments from specific technology aspects, identify key uncertainties underlying high-risk issues, compile a wide-range of data types in an innovative and flexible data organizing scheme, and inform planning and decision processes with a transparent and technically robust decision-support tool. A fully functional version of ERES for offshore wind will be developed in a subsequent phase of the project.

  5. Risk-Based Comparison of Carbon Capture Technologies

    SciTech Connect (OSTI)

    Engel, David W.; Dalton, Angela C.; Dale, Crystal; Jones, Edward

    2013-05-01T23:59:59.000Z

    In this paper, we describe an integrated probabilistic risk assessment methodological framework and a decision-support tool suite for implementing systematic comparisons of competing carbon capture technologies. Culminating from a collaborative effort among national laboratories under the Carbon Capture Simulation Initiative (CCSI), the risk assessment framework and the decision-support tool suite encapsulate three interconnected probabilistic modeling and simulation components. The technology readiness level (TRL) assessment component identifies specific scientific and engineering targets required by each readiness level and applies probabilistic estimation techniques to calculate the likelihood of graded as well as nonlinear advancement in technology maturity. The technical risk assessment component focuses on identifying and quantifying risk contributors, especially stochastic distributions for significant risk contributors, performing scenario-based risk analysis, and integrating with carbon capture process model simulations and optimization. The financial risk component estimates the long-term return on investment based on energy retail pricing, production cost, operating and power replacement cost, plan construction and retrofit expenses, and potential tax relief, expressed probabilistically as the net present value distributions over various forecast horizons.

  6. UNITED STATES NUCLEAR WASTE TECHNICAL REVIEW BOARD

    E-Print Network [OSTI]

    con144vf UNITED STATES NUCLEAR WASTE TECHNICAL REVIEW BOARD 2300 Clarendon Boulevard, Suite 1300 Dear Speaker Hastert, Senator Thurmond, and Secretary Richardson: The Nuclear Waste Technical Review with provisions of the Nuclear Waste Policy Amendments Act of 1987, Public Law 100-203. The Act requires the Board

  7. Appendix A Nuclear Waste Technical Review Board

    E-Print Network [OSTI]

    39 Appendices Appendices #12;Appendix A Nuclear Waste Technical Review Board Members: Curricula to the Nuclear Waste Technical Review Board. President Clinton appointed Dr. Cohon chairman on January 17, 1997, and Asia and on energy facility siting, including nuclear waste ship- ping and storage. In addition to his

  8. Appendix A Nuclear Waste Technical Review Board

    E-Print Network [OSTI]

    59 Appendices Appendices #12;Appendix A Nuclear Waste Technical Review Board Members: Curricula Cohon to serve on the Nuclear Waste Technical Review Board. President Clinton appointed Dr. Cohon, and Asia and on energy-facility siting, including nuclear waste shipping and storage. In addition to his

  9. UNITED STATES NUCLEAR WASTE TECHNICAL REVIEW BOARD

    E-Print Network [OSTI]

    UNITED STATES NUCLEAR WASTE TECHNICAL REVIEW BOARD 2300 Clarendon Boulevard, Suite 1300 Arlington.C. 20585 Dear Speaker Hastert, Senator Stevens, and Secretary Bodman: The Nuclear Waste Technical Review Board was created by Congress in the Nuclear Waste Policy Amendments Act (NWPAA) of 1987 and charged

  10. UNITED STATES NUCLEAR WASTE TECHNICAL REVIEW BOARD

    E-Print Network [OSTI]

    JEC187V3 UNITED STATES NUCLEAR WASTE TECHNICAL REVIEW BOARD 2300 Clarendon Boulevard, Suite 1300 of Energy 1000 Independence Avenue, SW Washington, DC 20585 Dear Secretary O'Leary: At the Nuclear Waste UNITED STATES NUCLEAR WASTE TECHNICAL REVIEW BOARD 2300 Clarendon Boulevard, Suite 1300 Arlington, VA

  11. UNITED STATES NUCLEAR WASTE TECHNICAL REVIEW BOARD

    E-Print Network [OSTI]

    UNITED STATES NUCLEAR WASTE TECHNICAL REVIEW BOARD 2300 Clarendon Boulevard, Suite 1300 Arlington Dear Speaker Pelosi, Senator Byrd, and Secretary Bodman: The Nuclear Waste Technical Review Board, and transporting high-level radioactive waste and spent nuclear fuel. The Board is required to report its findings

  12. Water Resources Center Annual Technical Report

    E-Print Network [OSTI]

    Inactivation of Microorganisms in Drinking Water using Ultraviolet (UV) Radiation and Residual Chlorine. DrWater Resources Center Annual Technical Report FY 2009 Water Resources Center Annual Technical Report FY 2009 1 #12;Introduction This is a report on the projects of the Rhode Island Water Resources

  13. UNITED STATES NUCLEAR WASTE TECHNICAL REVIEW BOARD

    E-Print Network [OSTI]

    of the overall system for managing spent fuel and defense high-level waste. The Board includes its findingsjlc029va UNITED STATES NUCLEAR WASTE TECHNICAL REVIEW BOARD 2300 Clarendon Boulevard, Suite 1300, D.C. 20585 Dear Speaker Gingrich, Senator Thurmond, and Secretary Peńa: The Nuclear Waste Technical

  14. Water Resources Center Annual Technical Report

    E-Print Network [OSTI]

    Water Resources Center Annual Technical Report FY 2001 Introduction Three research projects were. The technical transfer project set up a RI Water Resources Center Website to allow easy access to the Center treatment devices, such as oil/sediment separators, that have been widely installed in urbanized areas have

  15. Arkansas Water Resources Center Annual Technical Report

    E-Print Network [OSTI]

    Arkansas Water Resources Center Annual Technical Report FY 2010 Arkansas Water Resources Center Annual Technical Report FY 2010 1 #12;Introduction The Arkansas Water Resources Center located at the University of Arkansas, Fayetteville, Arkansas is part of the network of 54 water institutes established

  16. Arkansas Water Resources Center Annual Technical Report

    E-Print Network [OSTI]

    Arkansas Water Resources Center Annual Technical Report FY 2011 Arkansas Water Resources Center Annual Technical Report FY 2011 1 #12;Introduction The Arkansas Water Resources Center located at the University of Arkansas at Fayetteville, is part of the network of 54 water institutes established

  17. Colorado Water Institute Annual Technical Report

    E-Print Network [OSTI]

    Colorado Water Institute Annual Technical Report FY 2012 Colorado Water Institute Annual Technical Report FY 2012 1 #12;Introduction Colorado Water Institute Annual Report for the period: March 1, 2012 ­ February 28, 2013 Water research is more pertinent than ever in Colorado. Whether the project explores

  18. Colorado Water Institute Annual Technical Report

    E-Print Network [OSTI]

    Colorado Water Institute Annual Technical Report FY 2011 Colorado Water Institute Annual Technical Report FY 2011 1 #12;Introduction Water research is more pertinent than ever in Colorado. Whether the project explores the effects of decentralized wastewater treatment systems on water quality, optimal

  19. Arkansas Water Resources Center Annual Technical Report

    E-Print Network [OSTI]

    Arkansas Water Resources Center Annual Technical Report FY 2013 Arkansas Water Resources Center Annual Technical Report FY 2013 1 #12;Introduction The Arkansas Water Resources Center is part of the network of 54 water institutes established by the Water Resources Research Act of 1964 and is located

  20. Arkansas Water Resources Center Annual Technical Report

    E-Print Network [OSTI]

    Arkansas Water Resources Center Annual Technical Report FY 2009 Arkansas Water Resources Center Annual Technical Report FY 2009 1 #12;Introduction The Arkansas Water Resources Center located at the University of Arkansas, Fayetteville, Arkansas is part of the network of 54 water institutes established

  1. Colorado Water Institute Annual Technical Report

    E-Print Network [OSTI]

    Colorado Water Institute Annual Technical Report FY 2013 Colorado Water Institute Annual Technical Report FY 2013 1 #12;Introduction Water research is more important than ever in Colorado. Whether the project explores the effects of decentralized wastewater treatment systems on water quality, optimal

  2. Colorado Water Institute Annual Technical Report

    E-Print Network [OSTI]

    Colorado Water Institute Annual Technical Report FY 2009 Colorado Water Institute Annual Technical Report FY 2009 1 #12;Introduction Water research is more pertinent than ever in Colorado. Whether the research explores the effects of decentralized wastewater treatment systems on water quality, optimal

  3. Water Resources Center Annual Technical Report

    E-Print Network [OSTI]

    Water Resources Center Annual Technical Report FY 2007 Water Resources Center Annual Technical Report FY 2007 1 #12;Introduction The Rhode Island Water Resources Center has supported one information transfer project, "Clean Drinking Water in Rhode Island" and one research project "Enhancing Drinking Water

  4. Iowa Water Center Annual Technical Report

    E-Print Network [OSTI]

    Iowa Water Center Annual Technical Report FY 2010 Iowa Water Center Annual Technical Report FY 2010 1 #12;Introduction The Iowa Water Center is a multi-campus and multi-organizational center focusing-institutional water research that can improve Iowa's water quality and provide adequate water supplies to meet both

  5. Iowa Water Center Annual Technical Report

    E-Print Network [OSTI]

    Iowa Water Center Annual Technical Report FY 2011 Iowa Water Center Annual Technical Report FY 2011 1 #12;Introduction The Iowa Water Center is a multi-campus and multi-organizational center focusing-institutional water research that can improve Iowa's water quality and provide adequate water supplies to meet both

  6. Iowa Water Center Annual Technical Report

    E-Print Network [OSTI]

    Iowa Water Center Annual Technical Report FY 2012 Iowa Water Center Annual Technical Report FY 2012 1 #12;Introduction The Iowa Water Center is a multi-campus and multi-organizational center focusing-institutional water research that can improve Iowa's water quality and provide adequate water supplies to meet both

  7. Colorado Water Institute Annual Technical Report

    E-Print Network [OSTI]

    Colorado Water Institute Annual Technical Report FY 2010 Colorado Water Institute Annual Technical Report FY 2010 1 #12;Introduction Water research is more pertinent than ever in Colorado. Whether the project explores the effects of decentralized wastewater treatment systems on water quality, optimal

  8. Water Resources Center Annual Technical Report

    E-Print Network [OSTI]

    , and nitrogen in non-conventional onsite wastewater treatment processes: a technical and economic analysis Basic treatment processes: a technical and economic analysis Project Number: 2002CA1B Start Date: 3/1/2002 End for the Onsite Treatment of Wastewater in California, Center for Water Resources Engineering, University

  9. Waste transfer leaks technical basis document

    SciTech Connect (OSTI)

    ZIMMERMAN, B.D.

    2003-03-22T23:59:59.000Z

    This document provides technical support for the onsite radiological and toxicological, and offsite toxicological, portions of the waste transfer leak accident presented in the Documented Safety Analysis. It provides the technical basis for frequency and consequence bin selection, and selection of safety SSCs and TSRs.

  10. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-05 / 0-4562-1 2.Government accession No and Friction Losses in Multi-Strand Post- Tensioning Tendons Including the Effects of Emulsifiable Oils 6 Austin, TX 78705-2650 11. Contract or Grant No. 0-4562 13. Type of Report and Period Covered Technical

  11. BNL/SNS TECHNICAL NOTE R. Witkover

    E-Print Network [OSTI]

    BNL/SNS TECHNICAL NOTE NO. 049 R. Witkover September 23, 1998 ALTERNATING GRADIENT SYNCHROTRON-In-Gap" Monitor for the Spallation Neutron Source #12;SNS Technical Note Considerations in Designing a "Beam of approximately 550 nsec. With a design intensity of 1014 per pulse, un-controlled losses must be kept to a level

  12. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-05/0-1778-3 2. Government Accession No. 3, and others. A number of reports, tables, and queries have been prepared and documented herein showing example. This document is available to the public through the National Technical Information Service, Springfield

  13. Technical Documentation and Verification for the

    E-Print Network [OSTI]

    PNNL-15202 Technical Documentation and Verification for the Buildings Module in the Visual Sample://www.ntis.gov/ordering.htm This document was printed on recycled paper. (9/2003) #12;PNNL-15202 Technical Documentation and Verification ...................................................................... 1 2.0 Documentation of Statistical Methods and Computations

  14. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-05/0-1778-6 2. Government Accession No. 3 summarizes the tasks conducted under TxDOT Project 0-1778 "TxDOT Rigid Pavement Database." This document report is the final technical document prepared for the project. Additional information is provided

  15. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-04/0-4266-2 2. Government Accession No. 3 significant changes in traffic operation and safety. A review of the design standard documents shows Statement No restrictions. This document is available to the public through the National Technical

  16. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-10/0-5517-1 2. Government Accession No. 3 for a series of tire bale case histories. The following document outlines all the work conducted as part Statement No restrictions. This document is available to the public through the National Technical

  17. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-04/0-1405-7 2. Government Accession No. 3 researchers, after an extensive literature review. This report documents the final evaluation of the long No restrictions. This document is available to the public through the National Technical Information Service

  18. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-04/5-1873-01-1 2. Government Accession No to improve safety and facilitate traffic flow. Finally, they documented these design considerations. This document is available to the public through the National Technical Information Service, Springfield

  19. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-10/0-6044-1 2. Government Accession No. 3 the researchers' understanding of the general T&R approach used by the industry, (c) documents the research No restrictions. This document is available to the public through the National Technical Information Service

  20. Essays on risk aversion

    E-Print Network [OSTI]

    Jindapon, Paan

    2006-10-30T23:59:59.000Z

    the preferred distribution by a simple mean-preserving spread and the cost is a utility cost. Higher-order increases in risk lead to higher-order generalizations, and the com- parative statics method yields a unified approach to the problem of comparative risk...

  1. Improvements to Technical Specifications surveillance requirements

    SciTech Connect (OSTI)

    Lobel, R.; Tjader, T.R.

    1992-12-01T23:59:59.000Z

    In August 1983 an NRC task group was formed to investigate problems with surveillance testing required by Technical Specifications, and to recommend approaches to effect improvements. NUREG-1024 ( Technical Specifications-Enhancing Safety Impact'') resulted, and it contained recommendations to review the basis for test frequencies; to ensure that the tests promote safety and do not degrade equipment; and to review surveillance tests so that they do not unnecessarily burden personnel. The Technical Specifications Improvement Program (TSIP) was established in December 1984 to provide the framework for rewriting and improving the Technical Specifications. As an element of the TSIP, all Technical Specifications surveillance requirements were comprehensively examined as recommended in NUREG-1024. The results of that effort are presented in this report. The study found that while some testing at power is essential to verify equipment and system operability, safety can be improved, equipment degradation decreased, and unnecessary personnel burden relaxed by reducing the amount of testing at power.

  2. TWRS privatization process technical baseline

    SciTech Connect (OSTI)

    Orme, R.M.

    1996-09-13T23:59:59.000Z

    The U.S. Department of Energy (DOE) is planning a two-phased program for the remediation of Hanford tank waste. Phase 1 is a pilot program to demonstrate the procurement of treatment services. The volume of waste treated during the Phase 1 is a small percentage of the tank waste. During Phase 2, DOE intends to procure treatment services for the balance of the waste. The TWRS Privatization Process Technical Baseline (PPTB) provides a summary level flowsheet/mass balance of tank waste treatment operations which is consistent with the tank inventory information, waste feed staging studies, and privatization guidelines currently available. The PPTB will be revised periodically as privatized processing concepts are crystallized.

  3. Technical abstracts: Mechanical engineering, 1990

    SciTech Connect (OSTI)

    Broesius, J.Y. (comp.)

    1991-03-01T23:59:59.000Z

    This document is a compilation of the published, unclassified abstracts produced by mechanical engineers at Lawrence Livermore National Laboratory (LLNL) during the calendar year 1990. Many abstracts summarize work completed and published in report form. These are UCRL-JC series documents, which include the full text of articles to be published in journals and of papers to be presented at meetings, and UCID reports, which are informal documents. Not all UCIDs contain abstracts: short summaries were generated when abstracts were not included. Technical Abstracts also provides descriptions of those documents assigned to the UCRL-MI (miscellaneous) category. These are generally viewgraphs or photographs presented at meetings. An author index is provided at the back of this volume for cross referencing.

  4. US DRIVE Advanced Combustion and Emission Control Technical Team...

    Energy Savers [EERE]

    Advanced Combustion and Emission Control Technical Team Roadmap US DRIVE Advanced Combustion and Emission Control Technical Team Roadmap The ACEC focuses on advanced engine and...

  5. annual technical meeting: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Water Resources Research Institute Annual Technical Report FY 2012 New Jersey Water 322 Kansas Water Resources Research Institute Annual Technical Report Geosciences Websites...

  6. annual meeting technical: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Water Resources Research Institute Annual Technical Report FY 2012 New Jersey Water 322 Kansas Water Resources Research Institute Annual Technical Report Geosciences Websites...

  7. annual international technical: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Water Resources Research Institute Annual Technical Report FY 2012 New Jersey Water 286 Kansas Water Resources Research Institute Annual Technical Report Geosciences Websites...

  8. Net Zero Waste - Tools and Technical Support ...and other observations...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Net Zero Waste - Tools and Technical Support ...and other observations Net Zero Waste - Tools and Technical Support ...and other observations Presentation at Waste-to-Energy using...

  9. US DRIVE Electrochemical Energy Storage Technical Team Roadmap...

    Office of Environmental Management (EM)

    Electrochemical Energy Storage Technical Team Roadmap US DRIVE Electrochemical Energy Storage Technical Team Roadmap This U.S. DRIVE electrochemical energy storage roadmap...

  10. Sources of Technical Variability in Quantitative LC-MS Proteomics...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Sources of Technical Variability in Quantitative LC-MS Proteomics: Human Brain Tissue Sample Analysis. Sources of Technical Variability in Quantitative LC-MS Proteomics: Human...

  11. Building America Analysis Methods and Tools Standing Technical...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Building America Analysis Methods and Tools Standing Technical Committee Presentation Building America Analysis Methods and Tools Standing Technical Committee Presentation This...

  12. actinide halides technical: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    University, Department of Engineering, Technical Report 97-25, December 1997. Based Pont, Michael J. 276 CERTIFICATE PROGRAM in TECHNICAL WRITING Biology and Medicine Websites...

  13. Application of Engineering and Technical Requirements for DOE...

    Office of Environmental Management (EM)

    Engineering and Technical Requirements for DOE Nuclear Facilities Standard Review Plan (SRP) Application of Engineering and Technical Requirements for DOE Nuclear Facilities...

  14. Enforcement Letter, Babcock & Wilcox Technical Services Y-12...

    Energy Savers [EERE]

    Enforcement Letter, Babcock & Wilcox Technical Services Y-12, LLC - July 10, 2009 Enforcement Letter, Babcock & Wilcox Technical Services Y-12, LLC - July 10, 2009 July 10, 2009...

  15. NSRD-2015-TD01, Technical Report for Calculations of Atmospheric...

    Office of Environmental Management (EM)

    NSRD-2015-TD01, Technical Report for Calculations of Atmospheric Dispersion at Onsite Locations for DOE Nuclear Facilities NSRD-2015-TD01, Technical Report for Calculations of...

  16. WORKSHOP REPORT:Light-Duty Vehicles Technical Requirements and...

    Energy Savers [EERE]

    Light-Duty Vehicles Technical Requirements and Gaps for Lightweight and Propulsion Materials WORKSHOP REPORT:Light-Duty Vehicles Technical Requirements and Gaps for Lightweight and...

  17. WORKSHOP REPORT: Trucks and Heavy-Duty Vehicles Technical Requirements...

    Energy Savers [EERE]

    Heavy-Duty Vehicles Technical Requirements and Gaps for Lightweight and Propulsion Materials WORKSHOP REPORT: Trucks and Heavy-Duty Vehicles Technical Requirements and Gaps for...

  18. 2013 Geothermal Technologies Office Peer Review Technical Report...

    Energy Savers [EERE]

    2013 Geothermal Technologies Office Peer Review Technical Report 2013 Geothermal Technologies Office Peer Review Technical Report March 5, 2014 - 12:00am Addthis Foro Energy, Inc....

  19. Explanations of FreedomCAR/DOE Hydrogen Storage Technical Targets...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Explanations of FreedomCARDOE Hydrogen Storage Technical Targets Explanations of FreedomCARDOE Hydrogen Storage Technical Targets Summary of FreedomCAR Targets and Basis for...

  20. STEP Energy Coach and Technical Consultant Job Descriptions ...

    Energy Savers [EERE]

    Consultant Job Descriptions.pdf More Documents & Publications Technical Consultant RFP Tool Kit Framework: Small Town University Energy Program (STEP) Technical Consultant...

  1. assessment grant technical: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    rockfish management and conservation in the northeast Pacific 24 Technical Instrument Report CDBS 2009-01 Assessment and Delivery of Physics Websites Summary: Technical Instrument...

  2. Effective Community-Wide Policy Technical Assistance: The NREL...

    Open Energy Info (EERE)

    Wide Policy Technical Assistance: The NRELDOE Approach Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Effective Community-Wide Policy Technical Assistance: The NREL...

  3. 2011 Residential Energy Efficiency Technical Update Meeting Summary...

    Energy Savers [EERE]

    2011 Residential Energy Efficiency Technical Update Meeting Summary Report: Denver, Colorado - August 9-11, 2011 2011 Residential Energy Efficiency Technical Update Meeting Summary...

  4. Automated Home Energy Management (AHEM) Standing Technical Committee...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Home Energy Management (AHEM) Standing Technical Committee Strategic Plan - February 2012 Automated Home Energy Management (AHEM) Standing Technical Committee Strategic Plan -...

  5. Energy Department Announces New Technical Assistance for Tribal...

    Office of Environmental Management (EM)

    Energy Department Announces New Technical Assistance for Tribal Clean Energy Projects Energy Department Announces New Technical Assistance for Tribal Clean Energy Projects May 20,...

  6. Africa - Technical Potential of Solar Energy to Address Energy...

    Open Energy Info (EERE)

    Africa - Technical Potential of Solar Energy to Address Energy Poverty and Avoid GHG Emissions Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Technical Potential of...

  7. FreedomCAR and Fuel Partnership 2004 Highlights of Technical...

    Energy Savers [EERE]

    4 Highlights of Technical Accomplishments FreedomCAR and Fuel Partnership 2004 Highlights of Technical Accomplishments Report containing brief summaries of key accomplishments of...

  8. FAQS Gap Analysis Qualification Card - Senior Technical Safety...

    Office of Environmental Management (EM)

    Gap Analysis Qualification Card - Senior Technical Safety Manager FAQS Gap Analysis Qualification Card - Senior Technical Safety Manager Functional Area Qualification Standard Gap...

  9. FAQS Job Task Analyses - Safeguards and Security General Technical...

    Broader source: Energy.gov (indexed) [DOE]

    Base More Documents & Publications FAQS Qualification Card - Safeguards and Security General Technical Base FAQS Job Task Analyses - General Technical Base FAQS Qualification Card...

  10. Recent Research to Address Technical Barriers to Increased Use...

    Broader source: Energy.gov (indexed) [DOE]

    Recent Research to Address Technical Barriers to Increased Use of Biodiesel Recent Research to Address Technical Barriers to Increased Use of Biodiesel 2005 Diesel Engine Emissions...

  11. Task Order Awarded for Environmental Technical Services | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Project Office Audit Task Order Awarded for Technical and Safety Support Services DOE Issues Request for Quotations for Depleted Uranium Hexafluoride Conversion Technical Services...

  12. Task Order Awarded for Technical and Safety Support Services...

    Broader source: Energy.gov (indexed) [DOE]

    Order Awarded for Environmental Technical Services DOE Issues Request for Quotations for Depleted Uranium Hexafluoride Conversion Technical Services DOE Awards Small Business...

  13. aging final technical: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    abundance Oakley, Jeremy 32 Technical Brief CiteSeer Summary: ii iiiFOREWARD The Depleted Uranium Technical Brief is designed to convey available information and knowledge about...

  14. artery origin technical: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    arteries Atalar, Ergin 19 Technical Brief CiteSeer Summary: ii iiiFOREWARD The Depleted Uranium Technical Brief is designed to convey available information and knowledge about...

  15. Technical Assessment of Compressed Hydrogen Storage Tank Systems...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Compressed Hydrogen Storage Tank Systems for Automotive Applications Technical Assessment of Compressed Hydrogen Storage Tank Systems for Automotive Applications Technical report...

  16. Hydrogen and Fuel Cell Technical Advisory Committee Biennial...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hydrogen and Fuel Cell Technical Advisory Committee Biennial Report to the Secretary of Energy Hydrogen and Fuel Cell Technical Advisory Committee Biennial Report to the Secretary...

  17. Department of Energy Technical Support Document National Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    This Technical Support Document supplements the Department of Energy's (DOE's) Notice of Proposed Rulemaking. In this Technical Support Document, the Department of Energy presents...

  18. Risk Management in Biopharmaceutical Supply Chains

    E-Print Network [OSTI]

    Ma, Yao

    2011-01-01T23:59:59.000Z

    Supply Chain Risk Managementof Recent Work on Supply Chain Risk Management . . . . .M. , Supply chain risk management: Outlining an agenda for

  19. Systemic risk in consumer finance

    E-Print Network [OSTI]

    Poon, Martha

    2011-01-01T23:59:59.000Z

    Systemic risk in consumer finance Uncertain about risk HowComplexity, Ecology, Finance The Pre-History of ResilienceSystemic risk in consumer finance Martha Poon, NYU At the

  20. (Energy Risk Professional, ERP), (GARP),

    E-Print Network [OSTI]

    Kaplan, Alexander

    · ­ Dragana Pilipovic. Energy Risk: Valuing and Managing Energy Derivatives,2nd Edition (New York: Mc). 9: Risk Management of Energy Derivatives · ­ Alexander Triantis. Handbook of Modern Finance (New 1 ( ) : . (Energy Risk Professional, ERP

  1. Risk in the Weapons Stockpile

    SciTech Connect (OSTI)

    Noone, Bailey C [Los Alamos National Laboratory

    2012-08-14T23:59:59.000Z

    When it comes to the nuclear weapons stockpile, risk must be as low as possible. Design and care to keep the stockpile healthy involves all aspects of risk management. Design diversity is a method that helps to mitigate risk.

  2. Review of the Limerick Generating Station Probabilistic Risk Assessment

    SciTech Connect (OSTI)

    Papazoglou, I.A.; Karol, R.; Shiu, K.; Fiarman, S.; Lederman, L.; Ludewig, H.; Pratt, W.T.; Bari, R.A.

    1983-02-01T23:59:59.000Z

    A review of the Probabilistic Risk Assessment of the Limerick Generating Station was conducted with the broad objective of evaluating its risks in relation to those identified in the Reactor Safety Study (WASH-1400). The review included a technical assessment of the assumptions and methods used in the Limerick study. It also included a re-evaluation of the main results within the scope and general methodological framework of the study. This included both qualitative and quantitative analyses of accident initiators, data bases, accident sequences which result in core damage, core melt phenomena, fission product behavior, and offsite consequences. Specific comparisons were made between the Limerick study, the Brookhaven review, and the WASH-1400 reactor for the core damage frequency and the average frequencies of acute and latent fatalities. The effect of uncertainties was considered throughout the review process and the uncertainty bands for the risk indices were quantified.

  3. accumulated recoverable oil: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    simulation to optimize carbon dioxide (CO2) sequestration and enhance oil recovery (CO2-EOR) based on known 191 Algeria's New Oil Strategy Lahouari ADDI Physics Websites...

  4. Heavy oil reservoirs recoverable by thermal technology. Annual report

    SciTech Connect (OSTI)

    Kujawa, P.

    1981-02-01T23:59:59.000Z

    This volume contains reservoir, production, and project data for target reservoirs which contain heavy oil in the 8 to 25/sup 0/ API gravity range and are susceptible to recovery by in situ combustion and steam drive. The reservoirs for steam recovery are less than 2500 feet deep to comply with state-of-the-art technology. In cases where one reservoir would be a target for in situ combustion or steam drive, that reservoir is reported in both sections. Data were collectd from three source types: hands-on (A), once-removed (B), and twice-removed (C). In all cases, data were sought depicting and characterizing individual reservoirs as opposed to data covering an entire field with more than one producing interval or reservoir. The data sources are listed at the end of each case. This volume also contains a complete listing of operators and projects, as well as a bibliography of source material.

  5. Heavy oil reservoirs recoverable by thermal technology. Annual report

    SciTech Connect (OSTI)

    Kujawa, P.

    1981-02-01T23:59:59.000Z

    The purpose of this study was to compile data on reservoirs that contain heavy oil in the 8 to 25/sup 0/ API gravity range, contain at least ten million barrels of oil currently in place, and are non-carbonate in lithology. The reservoirs within these constraints were then analyzed in light of applicable recovery technology, either steam-drive or in situ combustion, and then ranked hierarchically as candidate reservoirs. The study is presented in three volumes. Volume I presents the project background and approach, the screening analysis, ranking criteria, and listing of candidate reservoirs. The economic and environmental aspects of heavy oil recovery are included in appendices to this volume. This study provides an extensive basis for heavy oil development, but should be extended to include carbonate reservoirs and tar sands. It is imperative to look at heavy oil reservoirs and projects on an individual basis; it was discovered that operators, and industrial and government analysts will lump heavy oil reservoirs as poor producers, however, it was found that upon detailed analysis, a large number, so categorized, were producing very well. A study also should be conducted on abandoned reservoirs. To utilize heavy oil, refiners will have to add various unit operations to their processes, such as hydrotreaters and hydrodesulfurizers and will require, in most cases, a lighter blending stock. A big problem in producing heavy oil is that of regulation; specifically, it was found that the regulatory constraints are so fluid and changing that one cannot settle on a favorable recovery and production plan with enough confidence in the regulatory requirements to commit capital to the project.

  6. Recoverable immobilization of transuranic elements in sulfate ash

    DOE Patents [OSTI]

    Greenhalgh, Wilbur O. (Richland, WA)

    1985-01-01T23:59:59.000Z

    Disclosed is a method of reversibly immobilizing sulfate ash at least about 20% of which is sulfates of transuranic elements. The ash is mixed with a metal which can be aluminum, cerium, samarium, europium, or a mixture thereof, in amounts sufficient to form an alloy with the transuranic elements, plus an additional amount to reduce the transuranic element sulfates to elemental form. Also added to the ash is a fluxing agent in an amount sufficient to lower the percentage of the transuranic element sulfates to about 1% to about 10%. The mixture of the ash, metal, and fluxing agent is heated to a temperature sufficient to melt the fluxing agent and the metal. The mixture is then cooled and the alloy is separated from the remainder of the mixture.

  7. ORISE: Crisis and Risk Communication

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Crisis and Risk Communication Crisis and Risk Communication Because a natural disaster, act of terrorism or other public emergency can happen without notice, having a planned,...

  8. Risk Management Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-01-18T23:59:59.000Z

    This Guide provides non-mandatory risk management approaches for implementing the requirements of DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets. Cancels DOE G 413.3-7.

  9. RISK ASSESSMENT CLOUD COMPUTING

    E-Print Network [OSTI]

    Columbia University

    SECURITY RESEARCH PRIVACY RISK ASSESSMENT AMC DATA FISMA CLOUD COMPUTING MOBILE DEVICES OPERATIONS application hosted in the cloud · Alaska DHHS fined $1.7M ­ Portable device stolen from vehicle · Mass Eye

  10. Performance Assessment Community of Practice Technical Exchange

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Interagency Performance and Risk Assessment Community of Practice The Interagency Performance and Risk Assessment Community of Practice (P&RA CoP) was formed to provide a forum to...

  11. Limiting Future Proliferation and Security Risks

    SciTech Connect (OSTI)

    Bari, R.

    2011-03-13T23:59:59.000Z

    A major new technical tool for evaluation of proliferation and security risks has emerged over the past decade as part the activities of the Generation IV International Forum. The tool has been developed by a consensus group from participating countries and organizations and is termed the Proliferation Resistance and Physical Protection (PR&PP) Evaluation Methodology. The methodology defines a set of challenges, analyzes system response to these challenges, and assesses outcomes. The challenges are the threats posed by potential actors (proliferant states or sub-national adversaries). It is of paramount importance in an evaluation to establish the objectives, capabilities, resources, and strategies of the adversary as well as the design and protection contexts. Technical and institutional characteristics are both used to evaluate the response of the system and to determine its resistance against proliferation threats and robustness against sabotage and terrorism threats. The outcomes of the system response are expressed in terms of a set of measures, which thereby define the PR&PP characteristics of the system. This paper summarizes results of applications of the methodology to nuclear energy systems including reprocessing facilities and large and small modular reactors. The use of the methodology in the design phase a facility will be discussed as it applies to future safeguards concepts.

  12. Technical basis for dose reconstruction

    SciTech Connect (OSTI)

    Anspaugh, L.R.

    1996-01-31T23:59:59.000Z

    The purpose of this paper is to consider two general topics: technical considerations of why dose-reconstruction studies should or should not be performed and methods of dose reconstruction. The first topic is of general and growing interest as the number of dose-reconstruction studies increases, and one asks the question whether it is necessary to perform a dose reconstruction for virtually every site at which, for example, the Department of Energy (DOE) has operated a nuclear-related facility. And there is the broader question of how one might logically draw the line at performing or not performing dose-reconstruction (radiological and chemical) studies for virtually every industrial complex in the entire country. The second question is also of general interest. There is no single correct way to perform a dose-reconstruction study, and it is important not to follow blindly a single method to the point that cheaper, faster, more accurate, and more transparent methods might not be developed and applied.

  13. 1990 Resource Program : Technical Report.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1990-07-01T23:59:59.000Z

    This Technical Report is a detailed presentation of the actions Bonneville Power Administration (BPA) will take to develop new resources to meet the power requirements of its customers. The primary focus of this report is on what BPA will do in Fiscal Years (FY's) 1992 and 1993. However, much care has been taken to define near-term actions aimed at meeting BPA's long-term needs. An aggressive, steadily increasing conservation program forms the foundation of the 1990 Resource Program and resource acquisitions for FY's 1992 and 1993. BPA's commitment to a steady ramp-up of the conservation program is key to achieving the least-cost approach to resource development, and to making the conservation resource deliverable in the long run. By itself, conservation can meet much of the likely range of load growth that BPA faces. A diverse mix of generation resources in small increments is the second cornerstone of the 1990 Resource Program. These generation resources can meet the rest of the likely range of BPA resource needs. Finally, a Resource Contingency Plan prepares BPA to reliably meet load in the event that load growth exceeds the likely range. 14 figs., 27 tabs.

  14. Final Scientific/Technical Report

    SciTech Connect (OSTI)

    Chang, Yale [JHU/APL; Thomas, Michael E. [JHU/APL; Siegrist, Karen M. [JHU/APL; Lennon, Andrew M. [JHU/APL; Hunter, Lawrence W. [JHU/APL; Oguz, Hasan O. [JHU/APL

    2014-07-01T23:59:59.000Z

    JHU/APL conducted solid propellant fire characterization tests in warm, humid, ambient conditions near sea level. Yttria and ceria surrogate materials were placed in the fires. The substrates simulating ground surfaces were concrete from a Kennedy Space Center launch pad, and steel covered with a protective ablative material representing a launch platform. In-situ instrumentation consisted of witness materials, thermocouples, air handlers, filters, and cascade impactors; remote instrumentation consisted of optical cameras and spectrometers. Test and analysis team members included the Naval Air Warfare Center Aircraft Division, Sandia National Laboratories (SNL), Alliant Techsystems, and the Johns Hopkins University. Test data were analyzed, reported, and delivered, including plume rise and transport captured on video. Derivation of the alumina particle size distributions formed the basis for condensing vapor and agglomeration estimates. Assessment of alumina mass in the plume, along with the surrogate fraction from filter forensics, provided an estimate of airborne surrogate mass. Technical interchange meetings were held with SNL and the Jet Propulsion Laboratory. Specifications for the fire environment were developed and delivered. A thermochemistry model that simultaneously provides the maximum temperature and heat flux was developed and delivered. An SPIE paper on 3D pyrometry of the fire was written and presented.

  15. Risk Identification and Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's PossibleRadiation Protection TechnicalResonantNovember 15 to March 15ARisk Identification and

  16. Risk Perceptions and Risk Management Strategies in French

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    EA 4272 Risk Perceptions and Risk Management Strategies in French Oyster Farming Véronique le Bihan Perceptions and Risk Management Strategies in French Oyster Farming Véronique Le Bihan, Sophie Pardo, Patrice and their businesses contribute to defining their degree of risk perception and reliance on management tools. Beyond

  17. THE FUNDAMENTAL RISK QUADRANGLE IN RISK MANAGEMENT, OPTIMIZATION

    E-Print Network [OSTI]

    Uryasev, Stanislav

    THE FUNDAMENTAL RISK QUADRANGLE IN RISK MANAGEMENT, OPTIMIZATION AND STATISTICAL ESTIMATION1 R be confronted in numerous situations. Dealing with them systematically for purposes in risk management Statistical estimation is inevitably a partner with risk management in handling hazards, which may be known

  18. Technical University of Denmark rsted DTU Automation

    E-Print Network [OSTI]

    Technical University of Denmark �rsted · DTU Automation Project: SICAM - SIngle Conversion stage based SICAM using an LC-network Petar Ljusev, MSc., Ph.D. student, �rsted · DTU Automation e-mail: pl

  19. Technical University of Denmark rsted DTU Automation

    E-Print Network [OSTI]

    Technical University of Denmark �rsted · DTU Automation Project: SICAM - SIngle Conversion stage, �rsted · DTU Automation e-mail: pl@oersted.dtu.dk Abstract In this report an isolated PWM DC-AC SICAM

  20. Energy Technical Assistance: Industrial Processes Program

    E-Print Network [OSTI]

    McClure, J. D.

    1980-01-01T23:59:59.000Z

    The Energy Technical Assistance Division of Texas Engineering Extension Service (TEEX) has implemented an energy conservation program to assist small industry in using energy more efficiently. This full time service, an outgrowth of the Texas A...

  1. Financial and Technical Resources The HUD Perspective 

    E-Print Network [OSTI]

    Jensen, J.

    2011-01-01T23:59:59.000Z

    Financial and Technical Resources The HUD Perspective U.S. Department of Housing and Urban Development Jerry Jensen, HUD Fort Worth Regional Office CATEE Conference November 9, 2011 Partnership for Sustainable Communities: Livability...

  2. Technical requirements specification for tank waste retrieval

    SciTech Connect (OSTI)

    Lamberd, D.L.

    1996-09-26T23:59:59.000Z

    This document provides the technical requirements specification for the retrieval of waste from the underground storage tanks at the Hanford Site. All activities covered by this scope are conducted in support of the Tank Waste Remediation System (TWRS) mission.

  3. Water Resources Research Institute Annual Technical Report

    E-Print Network [OSTI]

    Water Resources Research Institute Annual Technical Report FY 1999 Introduction ABSTRACT The FY 1999 Oregon Water Resources Research Institute (OWRRI) program included four research projects funded Coastal Lakes: Water Quality Status and Management Implications Based on Nutrient Loading OWRRI sponsored

  4. Hydraulic and Habitat Suitability Analyses Technical Memorandum

    E-Print Network [OSTI]

    Appendix D Hydraulic and Habitat Suitability Analyses Technical Memorandum #12;COPYRIGHT DECEMBER Series 2 and Pond Series 3 Hydraulic and Habitat Suitability Analyses Prepared for Bureau of Reclamation HILL, INC. III Hydraulic and Habitat Suitability Analyses

  5. Fifth technical contractors' conference on peat

    SciTech Connect (OSTI)

    Not Available

    1982-01-01T23:59:59.000Z

    The Fifth Technical Contractors' Conference on Peat was held April 28 to 29, 1982, at Bethesda, Maryland. Thirty papers have been entered into EDB and ERA; two had been entered previously from other sources. (LTN)

  6. TR-017 Ecology March 2002 Technical Report

    E-Print Network [OSTI]

    TR-017 Ecology March 2002 Technical Report Forest Research Vancouver Forest Region 2100 Labieux Region Coarse Woody Debris Working Group Research Disciplines: Ecology ~ Geology ~ Geomorphology Research Section, Vancouver Forest Region, BCMOF Research Disciplines: Ecology ~ Geology ~ Geomorphology

  7. Texas Water Resources Institute Annual Technical Report

    E-Print Network [OSTI]

    Texas Water Resources Institute Annual Technical Report FY 2003 Introduction The Mission of the Texas Water Resources Institute is to: (1) Provide leadership for Experiment Station and Extension research and education water programs statewide, coordinating with scientists, specialists, county agents

  8. Arkansas Water Resources Center Annual Technical Report

    E-Print Network [OSTI]

    and heavy metals to surface runoff following storm events. Evaluating runoff water quality response, innovative domestic wastewater disposal systems, ground water modeling and landuse mapping, erosionArkansas Water Resources Center Annual Technical Report FY 2008 Arkansas Water Resources Center

  9. Water Research Institute Annual Technical Report

    E-Print Network [OSTI]

    : Ground-water Flow and Transport Focus Category: Non Point Pollution, Surface Water, Toxic Substances Descriptors: Benthos, Bioindicators, Biomonitoring, Ecosystems, Heavy metals, Insects, Land use, PollutantsWater Research Institute Annual Technical Report FY 2001 Introduction Introduction - Research

  10. Contributions to Metric Number Technical Report

    E-Print Network [OSTI]

    Dent, Alexander W.

    Contributions to Metric Number Theory Paul Rowe Technical Report RHUL­MA­2002­2 5 December 2002, Professor Glyn Harman, for sug- gestions of problems to attempt, helpful advice on methods and help

  11. Utility Variable Generation Integration Group Fall Technical...

    Broader source: Energy.gov (indexed) [DOE]

    15, 2014 9:00AM CDT to October 17, 2014 3:00PM CDT The Utility Variable Generation Integration Group (UVIG) Fall Technical Workshop in San Antonio, Texas will provide attendees...

  12. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    to evaluate the technical suitability of AC overlays on CRCP. These criteria are, namely, a profile criterion, based on the remaining life concept and on the formulation of a dynamic load factor; a condition survey

  13. Fuel Pathway Integration Technical Team Roadmap

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fuel Pathway Integration Technical Team Roadmap June 2013 This roadmap is a document of the U.S. DRIVE Partnership. U.S. DRIVE (Driving Research and Innovation for Vehicle...

  14. Nebraska Water Resources Center Annual Technical Report

    E-Print Network [OSTI]

    : Groundwater, Models, Water Use Descriptors: Aquifer parameters, conjuntive use, groundwater modeling, surface-groundwater modeling, Surface- groundwater Relationships, Well hydraulics Problem and research objectives: ProblemNebraska Water Resources Center Annual Technical Report FY 2000 Introduction Welcome

  15. Energy Technical Assistance: Industrial Processes Program 

    E-Print Network [OSTI]

    McClure, J. D.

    1980-01-01T23:59:59.000Z

    The Energy Technical Assistance Division of Texas Engineering Extension Service (TEEX) has implemented an energy conservation program to assist small industry in using energy more efficiently. This full time service, an outgrowth of the Texas A...

  16. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-02/1884-2 2. Government Accession No. 3, paratransit systems 18. Distribution Statement No restrictions. This document is available to the public

  17. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-09/0-5367-1 2. Government Accession No. 3, deck, slab, shear, fatigue 18. Distribution Statement No restrictions. This document is available

  18. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-03/4382-1 2. Government Accession No. 3, concrete pavement, sensitivity, fatigue, distress 18. Distribution Statement No restrictions. This document

  19. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Zornberg, Jorge G.

    Technical Report Documentation Page 1. Report No. FHWA/TX-10/5-4829-01-1 2. Government Accession No, stiffness 18. Distribution Statement No restrictions. This document is available to the public through

  20. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. 1747-3 2. Government Accession No. 3. Recipient, Information Technology 18. Distribution Statement No restrictions. This document is available to the public

  1. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Zornberg, Jorge G.

    Technical Report Documentation Page 1. Report No. FHWA/TX-10/5-5517-01-1 2. Government Accession No, field monitoring 18. Distribution Statement No restrictions. This document is available to the public

  2. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-0-2122-1 2. Government Accession No. 3, regulations, vehicle characteristics 18. Distribution Statement No restrictions. This document is available

  3. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FWHA/TX-05/0-1774-3 2. Government Accession No. 3, rehabilitation, encapsulation 18. Distribution Statement No restrictions. This document is available

  4. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-09/0-5197-4 2. Government Accession No. 3 consolidating concrete, microcracking 18. Distribution Statement No restrictions. This document is available

  5. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-03/1892-1 2. Government Accession No. 3, nondestructive testing 18. Distribution Statement No restrictions. This document is available to the public

  6. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-05/9-580/589-1 2. Government Accession No resistance, creep, shrinkage 18. Distribution Statement No restrictions. This document is available

  7. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-08/0-4562-2 2. Government Accession No. 3 concrete 18. Distribution Statement No restrictions. This document is available to the public through

  8. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-04/0-1405-9 2. Government Accession No. 3 joints, reinforcement coatings 18. Distribution Statement No restrictions. This document is available

  9. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-03/1898-1 2. Government Accession No. 3 after the deck had hardened. 17. Key Words 18. Distribution Statement No restrictions. This document

  10. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-00/1795-1 2. Government Accession No. 3 strategies 18. Distribution Statement No restrictions. This document is available to the public through

  11. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-02/1395-2F 2. Government Accession No. 3 Bracing, Brace Forces, Torsional Stiffness 18. Distribution Statement No restrictions. This document

  12. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-02-1810-2 2. Government Accession No. 3 in Texas 18. Distribution Statement No restrictions. This document is available to the public through

  13. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-04/5-1291-01-1 2. Government Accession No),PASSER II, GEOPAK, Vehicle Turn Templates 18. Distribution Statement No restrictions. This document

  14. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    i Technical Report Documentation Page 1. Report No. FHWA/TX-07 / 0-1774-4 2. Government Accession, encapsulation 18. Distribution Statement No restrictions. This document is available to the public through

  15. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-10/0-5185-3 2. Government Accession No. 3 Pavement. 18. Distribution Statement No restrictions. This document is available to the public through

  16. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-02/1852-1 2. Government Accession No. 3 concrete mix design 18. Distribution Statement No restrictions. This document is available to the public

  17. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-08/5-4958-01-1 2. Government Accession No lens 18. Distribution Statement No restrictions. This document is available to the public through

  18. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    Technical Report Documentation Page 1. Report No. FHWA/TX-03-1810-3 2. Government Accession No. 3, Highway user taxes, Highway finance 18. Distribution Statement No restrictions. This document is available

  19. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Texas at Austin, University of

    FINAL COPY Technical Report Documentation Page 1. Report No. FHWA/TX-05/0-1700-2 2. Government-based specifications. 18. Distribution Statement No restrictions. This document is available to the public through

  20. Technical Report Documentation Page 1. Report No.

    E-Print Network [OSTI]

    Zornberg, Jorge G.

    Technical Report Documentation Page 1. Report No. FHWA/TX-07/0-5202-3 2. Government Accession No. 3 Shale, Paris Clay, Beaumont Clay. 18. Distribution Statement No restrictions. This document is available