Powered by Deep Web Technologies
Note: This page contains sample records for the topic "risk-based preliminary remediation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Risk Assessment Guidance for Superfund: Volume I - Human Health Evaluation Manual (Part B, Development of Risk-based Preliminary Remediation Goals)  

NLE Websites -- All DOE Office Websites (Extended Search)

B, B, Development of Risk-based Preliminary Remediation Goals) Interim United States Office of Research and EPA/540/R-92/003 Environmental Protection Development December 1991 Agency Washington, DC 20460 EPA/540/R-92/003 Publication 9285.7-01 B December 1991 Risk Assessment Guidance for Superfund: Volume I - Human Health Evaluation Manual (Part B, Development of Risk-based Preliminary Remediation Goals) Interim Office of Emergency and Remedial Response U.S. Environmental Protection Agency Washington, DC 20460 Printed on Recycled Paper N O T I C E The policies set out in this document are intended solely as guidance; they are not final U.S. Environmental Protection Agency (EPA) actions. These policies are not intended, nor can they be relied upon, to create any rights enforceable by any party in litigation with the United States. EPA officials may

2

Preliminary Notice of Violation, Rocky Mountain Remediation Services -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rocky Mountain Remediation Rocky Mountain Remediation Services - EA-97-04 Preliminary Notice of Violation, Rocky Mountain Remediation Services - EA-97-04 June 6, 1997 Preliminary Notice of Violation issued to Rocky Mountain Remediation Services related to a Radioactive Material Release during Trench Remediation at the Rocky Flats Environmental Technology Site, (EA-97-04) This letter refers to the Department of Energy's (DOE) evaluation of noncompliances associated with the dispersal of radioactive material during the remediation of trenches. Preliminary Notice of Violation, Rocky Mountain Remediation Services - EA-97-04 More Documents & Publications Preliminary Notice of Violation, Kaiser-Hill Company - EA-97-03 Consent Order, Kaiser-Hill Company, LLC - EA 98-03 Preliminary Notice of Violation , Rocky Flats Environmental Technology Site

3

Preliminary remediation goals for use at the U.S. Department of Energy Oak Ridge Operations Office  

SciTech Connect

This report presents Preliminary Remediation Goals (PRGs) for use in human health risk assessment efforts under the United States Department of Energy, Oak Ridge Operations Office Environmental Restoration (ER) Division. Chemical-specific PRGs are concentration goals for individual chemicals for specific medium and land use combinations. The PRGs are referred to as risk-based because they have been calculated using risk assessment procedures. Risk-based calculations set concentration limits using both carcinogenic or noncarcinogenic toxicity values under specific exposure pathways. The PRG is a concentration that is derived from a specified excess cancer risk level or hazard quotient. This report provides the ER Division with standardized PRGs which are integral to the Remedial Investigation/Feasibility Study process. By managing the assumptions and systems used in PRG derivation, the Environmental Restoration Risk Assessment Program will be able to control the level of quality assurance associated with these risk-based guideline values.

NONE

1995-06-01T23:59:59.000Z

4

Preliminary Notice of Violation, Rocky Mountain Remediation Services- EA-97-04  

Energy.gov (U.S. Department of Energy (DOE))

Preliminary Notice of Violation issued to Rocky Mountain Remediation Services related to a Radioactive Material Release during Trench Remediation at the Rocky Flats Environmental Technology Site, (EA-97-04)

5

Preliminary remediation goals for use at the US Department of Energy Oak Ridge Operations Office. Revision 1  

SciTech Connect

This technical memorandum presents Preliminary Remediation Goals (PRGs) for use in human health risk assessment efforts under the United States Department of Energy, Oak Ridge Operations Office Environmental Restoration (ER) Division. This document provides the ER Division with standardized PRGs which are integral to the Remedial Investigation/Feasibility Study process. They are used during project scooping (Data Quality Objectives development), in screening level risk assessments to support early action or No Further Investigation decisions, and in the baselines risk assessment where they are employed in the selection of chemicals of potential concern. The primary objective of this document is to standardize these values and eliminate any duplication of effort by providing PRGs to all contractors involved in risk activities. In addition, by managing the assumptions and systems used in PRG derivation, the ER Risk Assessment Program will be able to control the level of quality assurance associated with these risk-based guideline values.

NONE

1996-05-01T23:59:59.000Z

6

Preliminary Notice of Violation, Rocky Mountain Remediation Services...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Services related to a Radioactive Material Release during Trench Remediation at the Rocky Flats Environmental Technology Site, (EA-97-04) On June 6, 1997, the U.S. Department...

7

Remediation  

SciTech Connect

The three most frequently used remediation technologies are discussed: (1) NAPL removal, (2) Pump-and-Treat, (3) Soil Vapor Extraction.

Oostrom, Mart; Falta, Ron W.; Mayer, Alex S.; Javandel, I.; Hassanizadeh, S. M.

2005-12-06T23:59:59.000Z

8

University Responses to MPCA's Preliminary Written Comments to the UMore East Remedial Investigation Report  

E-Print Network (OSTI)

Remedial Investigation Report (July 12, 2012) Shortly before a meeting at the Minnesota Pollution Control: The ecological risk screening numbers were taken from the USACE site investigation reports. An RI Addendum may be consistent with MPCA and EPA guidelines for the investigative part, however the U of M still

Netoff, Theoden

9

Risk-Based Remediation Approach for Cs-137 Contaminated Sediment/Soils at the Savannah River Site (SRS) Lower Three Runs Tail (U) - 13348 - SRNS-RP-2012-00546  

SciTech Connect

Lower Three Runs is a large blackwater stream that runs through the eastern and southern portion of the Savannah River Site. The Lower Three Runs watershed includes two SRS facility areas: P Area (P Reactor) and R Area (R Reactor) that provided effluent discharges to Lower Three Runs. During reactor operations, effluent discharges were well above natural (pre-industrial) or present day stream discharges. The watershed contains a 2,500-acre mainstream impoundment (PAR Pond), several smaller pre-cooler ponds, and a canal system that connects the pre-cooler ponds and discharges surface water to PAR Pond. From the PAR Pond dam, Lower Three Runs flows approximately 36 kilometers braiding through bottom-land/flood-plain forests before it enters the Savannah River. About eight kilometers downstream from the PAR Pond dam, the SRS boundary narrows (termed the Lower Three Runs tail) providing a limited buffer of DOE property for the Lower Three Runs stream and associated flood-plain. Previous screening characterization efforts revealed Cs-137 contamination in the sediment/soils of the flood-plain. As a part of the American Recovery and Reinvestment Act stimulus package, a comprehensive characterization effort was executed on the sediment/soils of the Lower Three Runs tail flood-plain providing a comprehensive look at the contaminant signature of the area. As a follow-up to that characterization, a regulatory decision Core Team, comprised of members of the South Carolina Department of Health and Environmental Control, Environmental Protection Agency - Region IV, and DOE, conducted negotiations on a risk-based approach to address the level of contamination found in the tail flood-plain as an early action that provided a long-term solution to exposure scenarios. For evaluation purposes, the adolescent trespasser was selected as the most likely human receptor for the Lower Three Runs tail portion because of the natural attractiveness of the area for recreational activities (i.e., hunting, fishing, hiking etc.) and access from public property. Exposure of the adolescent trespasser to Cs-137 contaminated sediment/soil at concentrations greater than 23.7 pico curies per gram have been calculated to result in an unacceptable cancer risk (> 1 x 10{sup -4}). Comparing the characterization sampling results conducted in 2009 with the benchmark concentration of 23.7 pCi/g, identified elevated risk levels along three sampling areas in the Lower Three Runs tail portion. On January 5, 2012, it was agreed by the core team that a Removal Action in the Lower Three Runs tail was to be conducted for the identified soil/sediment locations in the three identified areas that exceed the 1 x 10{sup -4} risk (23.7 pCi/g) for the adolescent trespasser receptor. The addition of Land Use Controls following the Removal Action was appropriate to protect human health and the environment. A systematic screening matrix was initiated at the identified hot spots (i.e., sampling points with Cs-137 activities greater than 23.7 pCi/g) to identify the limits of the excavation area. Sediment/soil within the defined removal areas would be excavated to the depth necessary to achieve the cleanup goal and disposed of in a CERCLA Off-Site Rule approved disposal facility. It was agreed that this removal action would adequately reduce the volume of available Cs-137 in the Lower Three Runs tail and consequently residual activities of the Cs-137 would decay over time reducing the amount of Cs-137 available in the tail which would curtail risk. The Land Use Controls consist of installation of an additional seven miles of fencing at major road crossings, utility easements, and at areas that showed a higher probability of access. In addition, signs were placed along the entire SRS perimeter of the Lower Three Runs tail approximately every 200 feet. Sign posts included both a No Trespassing sign and a Contaminant Warning sign. The project initiated a subcontract for both the removal action and the installation of fencing and signs on May 1, 2012. All field activities were completed

Freeman, Candice [Department of Energy- Savannah River Site, Aiken, SC (United States)] [Department of Energy- Savannah River Site, Aiken, SC (United States); Bergren, Christopher; Blas, Susan; Kupar, James [Area Completion Projects, Savannah River Nuclear Solutions, LLC (United States)] [Area Completion Projects, Savannah River Nuclear Solutions, LLC (United States)

2013-07-01T23:59:59.000Z

10

Field Test Report: Preliminary Aquifer Test Characterization Results for Well 299-W15-225: Supporting Phase I of the 200-ZP-1 Groundwater Operable Unit Remedial Design  

SciTech Connect

This report examines the hydrologic test results for both local vertical profile characterization and large-scale hydrologic tests associated with a new extraction well (well 299-W15-225) that was constructed during FY2009 for inclusion within the future 200-West Area Groundwater Treatment System that is scheduled to go on-line at the end of FY2011. To facilitate the analysis of the large-scale hydrologic test performed at newly constructed extraction well 299-W15-225 (C7017; also referred to as EW-1 in some planning documents), the existing 200-ZP-1 interim pump-and-treat system was completely shut-down ~1 month before the performance of the large-scale hydrologic test. Specifically, this report 1) applies recently developed methods for removing barometric pressure fluctuations from well water-level measurements to enhance the detection of hydrologic test and pump-and-treat system effects at selected monitor wells, 2) analyzes the barometric-corrected well water-level responses for a preliminary determination of large-scale hydraulic properties, and 3) provides an assessment of the vertical distribution of hydraulic conductivity in the vicinity of newly constructed extraction well 299-W15-225. The hydrologic characterization approach presented in this report is expected to have universal application for meeting the characterization needs at other remedial action sites located within unconfined and confined aquifer systems.

Spane, Frank A.; Newcomer, Darrell R.

2009-09-23T23:59:59.000Z

11

Salmon Site Remedial Investigation Report, Exhibit 2  

SciTech Connect

This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the installation of a water supply system that will provide potable water to the site and residence in the proximity to the site; (2) continued maintenance of surface institutional controls and subsurface restrictions; and (3) continue to implement the long-term hydrologic monitoring program. The Salmon Site will be relinquished the State of Mississippi as mandated by Public Law 104-201-September 23, 1996, to be used as a demonstration forest/wildlife refuge. Should the land use change in the future and/or monitoring information indicates a change in the site conditions, the DOE will reassess the risk impacts to human health and the environment.

USDOE NV

1999-09-01T23:59:59.000Z

12

Salmon Site Remedial Investigation Report, Exhibit 4  

SciTech Connect

This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the installation of a water supply system that will provide potable water to the site and residence in the proximity to the site; (2) continued maintenance of surface institutional controls and subsurface restrictions; and (3) continue to implement the long-term hydrologic monitoring program. The Salmon Site will be relinquished the State of Mississippi as mandated by Public Law 104-201-September 23, 1996, to be used as a demonstration forest/wildlife refuge. Should the land use change in the future and/or monitoring information indicates a change in the site conditions, the DOE will reassess the risk impacts to human health and the environment.

USDOE /NV

1999-09-01T23:59:59.000Z

13

Salmon Site Remedial Investigation Report, Exhibit 5  

SciTech Connect

This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the installation of a water supply system that will provide potable water to the site and residence in the proximity to the site; (2) continued maintenance of surface institutional controls and subsurface restrictions; and (3) continue to implement the long-term hydrologic monitoring program. The Salmon Site will be relinquished the State of Mississippi as mandated by Public Law 104-201-September 23, 1996, to be used as a demonstration forest/wildlife refuge. Should the land use change in the future and/or monitoring information indicates a change in the site conditions, the DOE will reassess the risk impacts to human health and the environment.

USDOE /NV

1999-09-01T23:59:59.000Z

14

Screening and comparison of remedial alternatives for the South Field and flyash piles at the Fernald site  

SciTech Connect

The South Field, the Inactive Flyash Pile, and the Active Flyash Pile are in close proximity to each other and are part of Operable Unit 2 (OU2) at the Fernald Environmental Management Project (FEMP). The baseline risk assessment indicated that the exposure pathways which pose the most significant risk are external radiation from radionuclides in surface soils and use of uranium contaminated groundwater. This paper presents screening and comparison of various remedial alternatives considered to mitigate risks from the groundwater pathway. Eight remedial alternatives were developed which consisted of consolidation and capping, excavation and off-site disposal with or without treatment, excavation and on-site disposal with or without treatment and combinations of these. Risk-based source (soil) preliminary remediation levels (PRLs) and waste acceptance criteria (WACs) were developed for consolidation and capping, excavation, and on-site disposal cell. The PRLs and WACs were developed using an integrated modeling tool consisting of an infiltration model, a surface water model, a vadose zone model, and a three-dimensional contaminant migration model in saturated media. The PRLs and WACs were then used to determine need for soil treatment, determine excavation volumes, and screen remedial alternatives. The selected remedial alternative consisted of excavation and on-site disposal with off-site disposal of the fraction exceeding the WAC.

Bumb, A.C. [Fluor Daniel Inc., Greenville, SC (United States); Jones, G.N. [Fernald Environmental Restoration Management Corp., Cincinnati, OH (United States). Fernald Environmental Management Project; Warner, R.D. [Dept. of Energy, Fernald, OH (United States)

1996-05-01T23:59:59.000Z

15

Salmon Site Remedial Investigation Report, Appendix B (Part 2)  

SciTech Connect

This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the installation of a water supply system that will provide potable water to the site and residence in the proximity to the site; (2) continued maintenance of surface institutional controls and subsurface restrictions; and (3) continue to implement the long-term hydrologic monitoring program. The Salmon Site will be relinquished the State of Mississippi as mandated by Public Law 104-201-September 23, 1996, to be used as a demonstration forest/wildlife refuge. Should the land use change in the future and/or monitoring information indicates a change in the site conditions, the DOE will reassess the risk impacts to human health and the environment.

USDOE /NV

1999-09-01T23:59:59.000Z

16

A Risk-Based Sensor Placement Methodology  

SciTech Connect

A risk-based sensor placement methodology is proposed to solve the problem of optimal location of sensors or detectors to protect population against the exposure to and effects of known and/or postulated chemical, biological, and/or radiological threats. Risk is calculated as a quantitative value representing population at risk from exposure against standard exposure levels. Historical meteorological data are used to characterize weather conditions as the frequency of wind speed and direction pairs. The meteorological data drive atmospheric transport and dispersion modeling of the threats, the results of which are used to calculate risk values. Sensor locations are determined via an iterative dynamic programming algorithm whereby threats captured or detected by sensors placed in prior stages are removed from consideration in subsequent stages. In addition to the risk-based placement algorithm, the proposed methodology provides a quantification of the marginal utility of each additional sensor or detector. Thus, the criterion for halting the iterative process can be the number of detectors available, a threshold marginal utility value, or the cumulative detection of a minimum factor of the total risk value represented by all threats. The methodology quantifies the effect of threat reduction measures, such as reduced probability of one or more threats due to administrative and/or engineering controls.

Lee, Ronald W [ORNL; Kulesz, James J [ORNL

2008-01-01T23:59:59.000Z

17

Determination of risk-based, site-specific cleanup levels for an industrial site in Seattle, Washington  

SciTech Connect

Risk-based, site-specific cleanup criteria were developed for an active industrial site where shallow soil was contaminated with bunker fuel. This approach resulted in defensible cleanup levels that eliminated the need for complicated and disruptive remedial measures and is expediting site closure under Washington State Department of Ecology`s (Ecology) Independent Remedial Action Program. Initially, in anticipation of the sale of the property, a site investigation was conducted to provide information on the extent of contamination resulting from a leaking underground storage tank. Results of the investigation indicated that at least 3,600 cubic yards of soil contained bunker fuel at concentrations exceeding Ecology`s Model Toxics Control Act (MTCA) default Method A cleanup value for heavy oil of 200 milligrams per kilogram. The contamination extended under two of the site structures. Following Ecology`s new interim policy for cleanup of total petroleum hydrocarbons under MTCA, a risk-based cleanup criterion was calculated using an approach in which aliphatic and aromatic fractions of weathered bunker fuel were represented by surrogates of known toxicity. The cleanup criterion yielded by the quantitative evaluation was more than an order of magnitude higher than the default MTCA Method A value for heavy oil. Cleanup criteria for carcinogenic polynuclear aromatic hydrocarbons (cPAHs) were also derived. Use of these risk-based cleanup levels eliminated the need for remedial measures outside of the immediate vicinity of the former tank location, reducing the volume of soil that required remediation from 3,600 cubic yards to 70 cubic yards.

Birkner, P.D.; Gaulke, S.W.; Tirao, A.C.; Veilleux, A.L. [Shannon & Wilson, Inc., Seattle, WA (United States)

1997-12-31T23:59:59.000Z

18

PRELIMINARY ASSESSMENT/SITE INSPECTION REPORT AND SOLm W ASTE...  

NLE Websites -- All DOE Office Websites (Extended Search)

products, metals, and radionuclides. N ASTE QUANTITY: Preliminary information from the Remedial InvestigationFeasibility Study RIfFS) indicate the presence of watersludge in...

19

Remediation Experiences in Finland  

Science Journals Connector (OSTI)

This chapter discusses remediation practices for addressing gasoline-impacted soil and ground water at several hundred Neste Marketing Limited (Neste ... in Finland. The first systematic investigation and remediation

Martti R. Suominen; Nancy E. Milkey P.G.

2003-01-01T23:59:59.000Z

20

Pinellas Remediation Agreement Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pinellas Pinellas Agreement Name Remediation Agreement for the Four and One-Half Acre Site in Largo, Pinellas County, Florida State Florida Agreement Type Remediation Agreement Legal Driver(s) CERCLA/ Atomic Energy Act of 1954, as amended/ Florida Air and Water Pollution Control Act Scope Summary Remediation of property adjacent to the former Pinellas Plant Parties DOE; Florida Department of Environmental Protection Date 3/12/2001 SCOPE * Remediate the groundwater under a parcel of property adjacent to DOE's former Pinellas Plant to levels consistent with industrial use. * Complete remedial actions at the site in accordance with a Remedial Action Plan prepared by DOE and approved by FDEP. * Submit quarterly reports of interim remedial actions at the Site.

Note: This page contains sample records for the topic "risk-based preliminary remediation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Practical risk-based decision making: Good decisions made efficiently  

SciTech Connect

The Robotics and Process Systems Division of the Oak Ridge National Laboratory and the Westinghouse Savannah River Company have teamed with JBF Associates, Inc. to address risk-based robotic planning. The objective of the project is to provide systematic, risk-based relative comparisons of competing alternatives for solving clean-up problems at DOE facilities. This paper presents the methodology developed, describes the software developed to efficiently apply the methodology, and discusses the results of initial applications for DOE. The paper also addresses current work in applying the approach to problems in other industries (including an example from the hydrocarbon processing industry).

Haire, M.J. [Oak Ridge National Lab., TN (United States); Guthrie, V.; Walker, D. [JBF Associates, Inc., Knoxville, TN (United States); Singer, R. [Westinghouse Savannah River Co., Aiken, SC (United States)

1995-12-01T23:59:59.000Z

22

Groundwater Remediation and Modeling  

Science Journals Connector (OSTI)

Because of the author’s vantage point, this chapter is necessarily based on experience in ground-water remediation in the United States. Much of that...

Peter Shanahan

1995-01-01T23:59:59.000Z

23

Environmental restoration risk-based prioritization work package planning and risk ranking methodology. Revision 2  

SciTech Connect

This document presents the risk-based prioritization methodology developed to evaluate and rank Environmental Restoration (ER) work packages at the five US Department of Energy, Oak Ridge Field Office (DOE-ORO) sites [i.e., Oak Ridge K-25 Site (K-25), Portsmouth Gaseous Diffusion Plant (PORTS), Paducah Gaseous Diffusion Plant (PGDP), Oak Ridge National Laboratory (ORNL), and the Oak Ridge Y-12 Plant (Y-12)], the ER Off-site Program, and Central ER. This prioritization methodology was developed to support the increased rigor and formality of work planning in the overall conduct of operations within the DOE-ORO ER Program. Prioritization is conducted as an integral component of the fiscal ER funding cycle to establish program budget priorities. The purpose of the ER risk-based prioritization methodology is to provide ER management with the tools and processes needed to evaluate, compare, prioritize, and justify fiscal budget decisions for a diverse set of remedial action, decontamination and decommissioning, and waste management activities. The methodology provides the ER Program with a framework for (1) organizing information about identified DOE-ORO environmental problems, (2) generating qualitative assessments of the long- and short-term risks posed by DOE-ORO environmental problems, and (3) evaluating the benefits associated with candidate work packages designed to reduce those risks. Prioritization is conducted to rank ER work packages on the basis of the overall value (e.g., risk reduction, stakeholder confidence) each package provides to the ER Program. Application of the methodology yields individual work package ``scores`` and rankings that are used to develop fiscal budget requests. This document presents the technical basis for the decision support tools and process.

Dail, J.L.; Nanstad, L.D.; White, R.K.

1995-06-01T23:59:59.000Z

24

Risk based ISI application to a boiling water reactor  

SciTech Connect

The ASME Section XI Working Group on Implementation of Risk-Based Examination produced a code case to define risk-based selection rules that could be used for In-Service Inspection (ISI) of Class 1, 2, and 3 piping. To provide guidelines for practical implementation of the code case, EPRI sponsored work to develop evaluation procedures and criteria. As part of an EPRI sponsored pilot study, these procedures have been applied to a BWR plant. Piping within the scope of the existing Section XI program has been analyzed. The results of this effort indicate that implementation of RBISI programs can significantly reduce the cost and radiation exposure associated with in-service inspections. The revised program was compared to the previous program and a net gain in safety benefit was demonstrated.

Smith, A. [New York Power Authority, White Plains, NY (United States); Dimitrijevic, V.B.; O`Regan, P.J. [Yankee Atomic Electric Co., Bolton, MA (United States)

1996-12-01T23:59:59.000Z

25

A Framework for Sustainable Remediation  

Science Journals Connector (OSTI)

However, after more than 30 years of experience with remediation projects, it is now clear that remedial actions are frequently energy intensive, may produce their own pollutant emissions, and may disturb and cause controversy in neighboring communities. ... Regulators, industry, and communities recognize that sustainability principles must be integrated into remediation activities, and various sustainable remediation guidance documents have been developed. ...

Karin S. Holland

2011-08-11T23:59:59.000Z

26

Attenuation Based Remedies  

Energy.gov (U.S. Department of Energy (DOE))

The mission of the Attenuation Based Remedies in the Subsurface Applied Field Research Initiative is to seek holistic solutions to DOE’s groundwater contamination problems that consider not only...

27

Preliminary Screening  

Energy.gov (U.S. Department of Energy (DOE))

The first step in assessing renewable energy options is to conduct a preliminary screening to decide which technologies are worth investigating and which can be eliminated immediately. Preliminary...

28

Sustainable Soil Remediation:  

Science Journals Connector (OSTI)

...wastes and creating new markets for the end products...study of the treatment of diesel-contaminated soil indicated...size and location of markets relative to waste production...remediation scenario for a diesel-contaminated site using...catabolic activity in diesel contaminated soil following...

David L. Jones; John R. Healey

29

Sustainable Soil Remediation:  

Science Journals Connector (OSTI)

...recognised since the birth of agriculture, the landspreading of industrial...full life cycle assessment (LCA). For example, blending high-nutrient-content...cradle-to-grave) of an LCA can also lead to misleading...remediation option is best. In LCA, impacts are classified as...

David L. Jones; John R. Healey

30

Recommendations for Remedial Action at Everest, Kansas.  

SciTech Connect

On September 7, 2005, the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) presented a Scoping Memo (Argonne 2005) for preliminary consideration by the Kansas Department of Health and Environment (KDHE). This document suggested possible remedial options for the carbon tetrachloride contamination in groundwater at Everest, Kansas. The suggested approaches were discussed by representatives of the KDHE, the CCC/USDA, and Argonne at the KDHE office in Topeka on September 8-9, 2005, along with other technical and logistic issues related to the Everest site. In response to these discussions, the KDHE recommended (KDHE 2005) evaluation of several remedial processes, either alone or in combination, as part of a Corrective Action Study (CAS) for Everest. The primary remedial processes suggested by the KDHE included the following: (1) Hydraulic control by groundwater extraction with aboveground treatment; (2) Air sparging-soil vapor extraction (SVE) in large-diameter boreholes; and (3) Phytoremediation. As a further outcome of the 2005 meeting and as a precursor to the proposed CAS, the CCC/USDA completed the following supplemental investigations at Everest to address several specific technical concerns discussed with the KDHE: (1) Construction of interpretive cross sections at strategic locations selected by the KDHE along the main plume migration pathway, to depict the hydrogeologic characteristics affecting groundwater flow and contaminant movement (Argonne 2006a); (2) A field investigation in early 2006 (Argonne 2006c), as follows: (a) Installation and testing of a production well and associated observation points, at locations approved by the KDHE, to determine the response of the Everest aquifer to groundwater extraction near the Nigh property; (b) Groundwater sampling for the analysis of volatile organic compounds (VOCs) and the installation of additional permanent monitoring points at locations selected by the KDHE, to further constrain the existing contaminant plume; and (c) Resampling of all existing permanent monitoring points for VOCs and biodegradation parameter analyses, at the request of the KDHE. On the basis of these studies (Argonne 2006a,c) and the CCC/USDA's past investigations at Everest (Argonne 2006b), the CCC/USDA concluded that groundwater extraction is not an effective remedial option for this site, and the KDHE concurred (KDHE 2006). As outlined in the next section, the CCC/USDA also believes that air sparging does not represent a viable remedial alternative. The CCC/USDA therefore proposes to collect the technical data required to evaluate the potential viability of a phytoremediation approach for this site and, if appropriate, to support the development of a remedial design.

LaFreniere, L. M. (Environmental Science Division)

2007-02-15T23:59:59.000Z

31

Remedial Action Performed  

Office of Legacy Management (LM)

General Motors Site in General Motors Site in Adrian, Michigan Department of Energy OiZce of Assistant Manager for Environmental Management Oak Ridge Operations January 2001 69 Printed on recycledhcydable paper. CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE GENERAL MOTORS SITE ADRIAN, MICHIGAN JANUARY 200 1 Prepared for United States Army Corps of Engineers Under Contract No. DACW45-98-D-0028 BY Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS FIGURES .............................................................................................................................................. TABLES ...............................................................................................................................................

32

CENTRAL PLATEAU REMEDIATION  

SciTech Connect

A systematic approach to closure planning is being implemented at the Hanford Site's Central Plateau to help achieve the goal of closure by the year 2035. The overall objective of Central Plateau remediation is to protect human health and the environment from the significant quantity of contaminated material that resulted from decades of plutonium production in support of the nation's defense. This goal will be achieved either by removing contaminants or placing the residual contaminated materials in a secure configuration that minimizes further migration to the groundwater and reduces the potential for inadvertent intrusion into contaminated sites. The approach to Central Plateau cleanup used three key concepts--closure zones, closure elements, and closure process steps--to create an organized picture of actions required to complete remediation. These actions were merged with logic ties, constraints, and required resources to produce an integrated time-phased schedule and cost profile for Central Plateau closure. Programmatic risks associated with implementation of Central Plateau closure were identified and analyzed. Actions to mitigate the most significant risks are underway while high priority remediation projects continue to make progress.

ROMINE, L.D.

2006-02-01T23:59:59.000Z

33

CENTRAL PLATEAU REMEDIATION OPTIMIZATION STUDY  

SciTech Connect

THE CENTRAL PLATEAU REMEDIATION OPTIMIZATION STUDY WAS CONDUCTED TO DEVELOP AN OPTIMAL SEQUENCE OF REMEDIATION ACTIVITIES IMPLEMENTING THE CERCLA DECISION ON THE CENTRAL PLATEAU. THE STUDY DEFINES A SEQUENCE OF ACTIVITIES THAT RESULT IN AN EFFECTIVE USE OF RESOURCES FROM A STRATEGIC PERSPECTIVE WHEN CONSIDERING EQUIPMENT PROCUREMENT AND STAGING, WORKFORCE MOBILIZATION/DEMOBILIZATION, WORKFORCE LEVELING, WORKFORCE SKILL-MIX, AND OTHER REMEDIATION/DISPOSITION PROJECT EXECUTION PARAMETERS.

BERGMAN TB; STEFANSKI LD; SEELEY PN; ZINSLI LC; CUSACK LJ

2012-09-19T23:59:59.000Z

34

Risk-based inspection in ASME Section XI  

SciTech Connect

By 1970 the first edition of the ASME Code Section XI, Inservice Inspection of Nuclear Reactor Coolant Systems was published. From its inception, the Section XI inservice inspection scope was based on a fundamental risk-based selection process. In other words the inservice inspection scope included components where the consequences of a pressure boundary failure were high. Once the consequence significant system boundaries were established, inspections would then be performed at locations believed to be most susceptible service induced failure. Current Section XI requirements require that inspection locations be selected on the basis of peak stress and fatigue usage values contained in the Design Reports. These original stress calculations were designed to qualify a design and assure that the plant would provide reliable service throughout its design life. For the most part, the fatigue usage values in these reports do not provide an accurate measure of service life. As service history has demonstrated, the use of Design Report stresses and fatigue usage values can be misleading. The Section XI ISI inspection requirements have always been intended to focus inspections at those locations in the plant that pose the greater risk to reactor safety. This fundamental principle behind the Section XI inspection requirements has guided Section XI since its inception. However, today Utility resources are limited. The move in many states to deregulate utilities and growing competition from independent power producers is challenging Owners to reduce operating and maintenance cost without sacrificing safety. These programs should allow plants to focus limited resources on those locations where damage mechanisms are active and consequences are high. This will provide for efficient use of plants resources and improve safety.

Lance, J.J.

1996-12-01T23:59:59.000Z

35

Remedial Action Performed  

Office of Legacy Management (LM)

Baker and Williams Baker and Williams Warehouses Site in New York, New York, 7997 - 7993 Department of Energy Former Sites Restoration Division Oak Ridge Operations Office November 7 995 CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE BAKER AND WILLIAMS WAREHOUSES SITE IN NEW YORK, NEW YORK, 1991-1993 NOVEMBER 1995 Prepared for United States Department of Energy Oak Ridge Operations Office Under Contract No. DE-AC05-910R21949 BY Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 __ CONTENTS .- ~_- _- ..- ^_ FIGURES . ...,.,.....,,........,,.,_.....,.,.,.__,....,,,,, v TABLES ,.,__...,,....,..._._..,,,,_._...,.,.,,.,,,..._,,,, vi ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..v~

36

Remedial Action Performed  

Office of Legacy Management (LM)

' ' at the C. H. Schnoor Site, Springdale, Pennsylvania, in 1 994 Department of Energy Former Sites Restoration Division Oak Ridge Operations Office November 1996 CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE C. H. SCHNOOR SITE SPRINGDALE, PENNSYLVANIA, IN 1994 NOVEMBER 1996 prep&ed for United States Department of ~nergy Oak Ridge Operations Off= r Under Contract No. DE-AC05-910R21949 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. '14501 CONTENTS FIGURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v TABLES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vi UNITS OF MEASURE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vii

37

Remedial Action Performed  

Office of Legacy Management (LM)

Alba Craft Laboratory and Alba Craft Laboratory and Vicinity Properties Site in Oxford, Ohio C Department of Energy Former Sites Restoration Division Oak Ridge Operations Office January 1997 $$@T Op% 3 @!B . i~d!l Ab Printed on recycled/recyclable paper. CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE FORMER ALBA CRAFT LABORATORY AND VICINITY PROPERTIES SITE IN OXFORD, OHIO JANUARY 1997 Prepared for United States Department of Energy Oak Ridge Operations Office Under Contract No. DE-AC0591 OR2 1949 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS Page FIGURES .............................................................................................................................................. v TABLES.. .............................................................................................................................................. vi

38

Remedial Action Performed  

Office of Legacy Management (LM)

Aliquippa Forge Site Aliquippa Forge Site in Aliquippa, Pennsylvania Department of Energy Former Sites Restoration Division Oak Ridge Operations Office November 1996 CERTIFICATION DOCKE.~ FOR THE REMEDIAL ACTION PERFORMED AT THE ALIQUIPPA FORGE SITE IN ALIQUIPPA, PENNSYLVANIA NOVEMBER 1996 Prepared for . UNITED STATES DEPARTMENT OF ENERGY Oak Ridge Operations Office Under Contract No. DE-AC05-9 1 OR2 1949 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS Page FIGURES v . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . TABLES vii . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . viii UNITSOFMEASURE ix . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . INTRODUCTION xi . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

39

Advanced Remediation Technologies  

SciTech Connect

The United States Department of Energy (DOE), Office of Environmental Management (EM) is responsible for the cleanup of nation's nuclear weapons program legacy wastes, along with waste associated with nuclear energy programs and research. The EM cleanup efforts continue to progress, however the cleanup continues to be technologically complex, heavily regulated, long-term; and the effort also has a high life cycle cost estimate (LCCE) effort. Over the past few years, the EM program has undergone several changes to accelerate its cleanup efforts with varying degrees of success. This article will provide some insight into the Advanced Remediation Technologies (ART) projects that may enhance cleanup efforts and reduce life cycle costs. (authors)

Krahn, St.; Miller, C.E. [The United States Department of Energy, Office of Environmental Management, Washington, D.C. (United States)

2008-07-01T23:59:59.000Z

40

Saxton soil remediation project  

SciTech Connect

The Saxton Nuclear Experimental Facility (SNEF) consists of a 23-MW(thermal) pressurized light water thermal reactor located in south central Pennsylvania. The Saxton Nuclear Experimental Corporation (SNEC), a wholly owned subsidiary of the General Public Utilities (GPU) Corporation, is the licensee for the SNEF. Maintenance and decommissioning activities at the site are conducted by GPU Nuclear, also a GPU subsidiary and operator of the Three Mile Island and Oyster Creek nuclear facilities. The remediation and radioactive waste management of contaminated soils is described.

Holmes, R.D. [GPU Nuclear Corporation, Middletown, PA (United States)

1995-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "risk-based preliminary remediation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Surfactants and subsurface remediation  

SciTech Connect

Because of the limitations of pump-and-treat technology, attention is now focused on the feasibility of surfactant use to increase its efficiency. Surfactants have been studied for use in soil washing and enhanced oil recovery. Although similarities exist between the applications, there are significant differences in the objectives of the technologies and the limitations placed on surfactant use. In this article we review environmental studies concerned with the fate and transport of surface-active compounds in the subsurface environment and discuss key issues related to their successful use for in situ aquifer remediation, particularly with respect to nonaqueous-phase liquids.

West, C.C.; Harwell, J.H.

1992-01-01T23:59:59.000Z

42

Approved CAMU equals faster, better, cheaper remediation at the Fernald Environmental Management Project  

SciTech Connect

A 1,050 acre Corrective Action Management Unit (CAMU) was approved for the Fernald Protection Agency Environmental Management Project (FEMP) by the US Environmental Protection Agency (USEPA) to manage environmental media remediation waste in the Operable Unit 5 Record of Decision, 1995. Debris is also proposed for management as remediation waste under the CAMU Rule in the Operable Unit 3 Remedial Investigation/Feasibility Study (RI/FS) Report, as of December 1995. Application of the CAMU Rule at the FEMP will allow consolidation of low-level mixed waste and hazardous waste that presents minimal threat from these two operable units in an on-property engineered disposal facility without triggering land disposal restrictions (LDRs). The waste acceptance criteria for the on property disposal facility are based on a combination of site-specific risk-based concentration standards, as opposed to non-site-specific requirements imposed by regulatory classifications.

Dupuis-Nouille, E.M. [Fernald Environmental Restoration Management Corp., Cincinnati, OH (United States)] [Fernald Environmental Restoration Management Corp., Cincinnati, OH (United States); Goidell, L.C.; Strimbu, M.J. [Jacobs Engineering Co., Cincinnati, OH (United States)] [Jacobs Engineering Co., Cincinnati, OH (United States); Nickel, K.A. [US Dept. of Energy-Fernald, CIncinnati, OH (United States)] [US Dept. of Energy-Fernald, CIncinnati, OH (United States)

1996-03-01T23:59:59.000Z

43

Evaluation of previous remedial construction along the Duquesne Bluff  

Science Journals Connector (OSTI)

The Boulevard of the Allies is a major four lane roadway in Pittsburgh, Pennsylvania that is constructed atop a near vertical, 35 meter high rock slope known locally as the Duquesne Bluff. Stratigraphic relief observed on the bluff consists of alternating sequences of flat lying sedimentary deposits of sandstone, siltstone, shale, carbonaceous shale, claystone and limestone. Expsoure of alternating sequences of durable and less durable rock has resulted in differential weathering and the formation of precarious overhanging conditions. In the interest of motorist safety and roadway improvement, a major remedial program was undertaken by the Pennsylvania Department of Transportation (PennDOT) in the mid 1980s. Primary remedial activities included rock trimming, rock bolting, the construction of dental concrete buttressing for overhanging rock support and shotcrete slope facing to arrest continued weathering of less durable claystone and carbonaceous shale exposures. As part of a current roadway improvement project, PennDOT and their consultant, Gannett Fleming, Inc., are evaluating the performance of previous remedial construction and are developing preliminary alternatives for future remediation. This paper will discuss the slope geology, overall favorable performance of the previous remedial construction and unfavorable slope conditions that may have resulted from large scale trimming operations.

J.W. Kovacs; W.R. Adams Jr.

1997-01-01T23:59:59.000Z

44

BUILDING 96 RECOMMENDATION FOR SOURCE AREA REMEDIATION  

E-Print Network (OSTI)

of the 1999 Operable Unit (OU) III Remedial Investigation/Feasibility Study(RI/FS) and was designated as AreaOU III BUILDING 96 RECOMMENDATION FOR SOURCE AREA REMEDIATION FINAL Prepared by: Brookhaven REMEDIATION Executive Summary

45

Independent Activity Report, Savannah River Remediation - July...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Remediation - July 2010 Independent Activity Report, Savannah River Remediation - July 2010 July 2010 Savannah River Operations Office Integrated Safety Management System Phase II...

46

Charities and Political Campaigning: The Impact of Risk-Based Regulation  

Science Journals Connector (OSTI)

This article examines the effects of the Charity Commission’s implementation of risk-based regulation on the political campaigning activities of charities. In doing so ... with a brief exploration of the emergenc...

Karen Atkinson

2008-08-01T23:59:59.000Z

47

UNIVERSITY OF MINNESOTA UMore Park Remedial Investigation  

E-Print Network (OSTI)

UNIVERSITY OF MINNESOTA UMore Park Remedial Investigation Frequently Asked Questions What is a remedial investigation? A remedial investigation is a technical assessment that characterizes the soil. A remedial investigation includes the analysis of soil and water samples as well as evaluating existing data

Netoff, Theoden

48

ICDF Complex Remedial Action Report  

SciTech Connect

This Idaho CERCLA Disposal Facility (ICDF) Remedial Action Report has been prepared in accordance with the requirements of Section 6.2 of the INEEL CERCLA Disposal Facility Remedial Action Work Plan. The agency prefinal inspection of the ICDF Staging, Storage, Sizing, and Treatment Facility (SSSTF) was completed in June of 2005. Accordingly, this report has been developed to describe the construction activities completed at the ICDF along with a description of any modifications to the design originally approved for the facility. In addition, this report provides a summary of the major documents prepared for the design and construction of the ICDF, a discussion of relevant requirements and remedial action objectives, the total costs associated with the development and operation of the facility to date, and identification of necessary changes to the Agency-approved INEEL CERCLA Disposal Facility Remedial Action Work Plan and the ICDF Complex Operations and Maintenance Plan.

W. M. Heileson

2007-09-26T23:59:59.000Z

49

Remediation alternatives for low-level herbicide contaminated groundwater  

SciTech Connect

In early 1995, an evaluation of alternatives for remediation of a shallow groundwater plume containing low-levels of an organic herbicide was conducted at BASF Corporation, a petrochemical facility located in Ascension Parish, Louisiana. The contaminated site is located on an undeveloped portion of property within 1/4 mile of the east bank of the Mississippi River near the community of Geismar. Environmental assessment data indicated that about two acres of the thirty acre site had been contaminated from past waste management practices with the herbicide bentazon. Shallow soils and groundwater between 5 to 15 feet in depth were affected. Maximum concentrations of bentazon in groundwater were less than seven parts per million. To identify potentially feasible remediation alternatives, the environmental assessment data, available research, and cost effectiveness were reviewed. After consideration of a preliminary list of alternatives, only two potentially feasible alternatives could be identified. Groundwater pumping, the most commonly used remediation alternative, followed by carbon adsorption treatment was identified as was a new innovative alternative known as vegetative transpiration. This alternative relies on the natural transpiration processes of vegetation to bioremediate organic contaminants. Advantages identified during screening suggest that the transpiration method could be the best remediation alternative to address both economic and environmental factors. An experiment to test critical factors of the vegetatived transpiration alternative with bentazon was recommended before a final decision on feasibility can be made.

Conger, R.M. [BASF Corp., Geismar, LA (United States)

1995-10-01T23:59:59.000Z

50

Oak Ridge Operations Formerly Utilized Sites Remedial Action Program  

Office of Legacy Management (LM)

IC77GLg /'-Oi. SEP 20 1982 IC77GLg /'-Oi. SEP 20 1982 10-05-04B-001 Deportment of Energy Oak Ridge Operations Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DE-AC05-810R20722 PRELIMINARY ENGINEERING EVALUATION OF REMEDIAL ACTION ALTERNATIVES BAYO CANYON SITE, LOS ALAMOS, NEW MEXICO SEPTEMBER 1982 Bechtel Job 14501 Bechtel National, Inc. Nuclear Fuel Operations LEGAL NOTICE This report was prepared as an account of work sponsored by the United States Government. Neither the United States nor the United States Department of Energy, nor any of their employees, nor any of their contractors, subcontractors, or their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness or usefulness of any information, apparatus, product or process disclosed, or represents that its use

51

PRELIMINARY SURVEY OF VITRO CORPORATION  

Office of Legacy Management (LM)

PRELIMINARY SURVEY OF VITRO CORPORATION (VITRO LABORATORIES) WEST ORANGE, NEW JERSEY Work performed by the Health and Safety Research Division Oak Ridge National Laboratory Oak Ridge, Tennessee 37830 March 1980 OAK RIDGE NATIONAL LABORATORY operated by UNION CARBIDE CORPORATION for the DEPARTMENT OF ENERGY as part of the Formerly Utilized Sites-- Remedial Actton Program VITRO CORPORATION (VITRO LABORATORIES) WEST ORANGE, NEW JERSEY At the request of the Department of Energy (DOE), a preliminary survey was performed at the former Vitro Corporation Laboratory in West Orange, New Jersey (see Fig 1), on November 30, 1977, to assess the radiological status of those facilities utilized under Atomic Energy Commission (AEC) contract during the late 1950s and early 1960s. This

52

Surfactants for ground water remediation  

Science Journals Connector (OSTI)

Ground water contamination is a most intractable form of pollution. Spilled solvent or fuel liquids are trapped below the water table by colloidal forces. Surfactants may be used to dramatically improve contaminated aquifer remediation rates. Principal remediation mechanisms include micellar solubilization and mobilization of the trapped liquids by lowering of the oil/water interfacial tension. Surfactant selection is a key to the successful design of a remediation effort, and involves consideration of factors including Krafft Point, surfactant adsorption onto the aquifer solids, and the phase behavior of the oil/water/surfactant system. Successful field demonstrations have occurred in recent months and the technology is moving rapidly toward commercialization. Critical research issues remain including acceptable clean-up levels, surfactant/contaminant in situ biodegradation rates, and surfactant decontamination and reuse.

Jeffrey H. Harwell; David A. Sabatini; R.C. Knox

1999-01-01T23:59:59.000Z

53

Streamline simulation of Surfactant Enhanced Aquifer Remediation  

E-Print Network (OSTI)

Nonaqueous Phase Liquids (NAPLS) are a recognized source of groundwater contamination. Surfactant Enhanced Aquifer Remediation (SEAR) shows promise in increasing the efficiency and effectiveness over traditional "pump and treat" NAPL remediation...

Tunison, Douglas Irvin

1996-01-01T23:59:59.000Z

54

Use of Risk Analysis on Remedial Alternatives  

Science Journals Connector (OSTI)

Quantitative risk assessment (RA) is a tool used in determining a remedial alternative’s effectiveness of reducing public health ... to occur at a site. Under the Remedial Investigation/Feasibility Study (RI/FS) ...

Teresa A. Schuller; Denice H. Wardrop…

1991-01-01T23:59:59.000Z

55

Assessment of Remedial Actions for Contaminated Sites  

Science Journals Connector (OSTI)

During the investigation in the field of remedial actions on contaminated land, an appropriate concept ... site, an evaluation of the existing alternative remedial techniques is necessary. The comparative evaluat...

Th. Neteler; H. L. Jessberger

1993-01-01T23:59:59.000Z

56

Preliminary Characterization of a NAPL-Contaminated Site using Borehole Geophysical Techniques  

E-Print Network (OSTI)

preliminary results from an on-going geophysical investigation of the former DOE Pinel- las site, a site and side-effects from previous remediation activities. Continuing research at the Pinellas site will focus presents preliminary results from our on-going geophysical investigation of a former U.S. Department

Ajo-Franklin, Jonathan

57

Toxic Remediation System And Method  

DOE Patents (OSTI)

What is disclosed is a novel toxic waste remediation system designed to provide on-site destruction of a wide variety of hazardous organic volatile hydrocarbons, including but not limited to halogenated and aromatic hydrocarbons in the vapor phase. This invention utilizes a detoxification plenum and radiation treatment which transforms hazardous organic compounds into non-hazardous substances.

Matthews, Stephen M. (Alameda County, CA); Schonberg, Russell G. (Santa Clara County, CA); Fadness, David R. (Santa Clara County, CA)

1996-07-23T23:59:59.000Z

58

Residential radon remediation: performance over 17 years  

Science Journals Connector (OSTI)

......covering about 1000 m2. Water drains into the basin...sub-slab ventilation remediation system installed, i...sub-slab ventilation remediation (Bq mSE). Measured...concentration with height above ground level. For example...had a sub-slab radon remediation system installed that......

Naomi H. Harley; Passaporn Chittaporn; Anthony Marsicano

2011-05-01T23:59:59.000Z

59

Bargaining over Remedies in Merger Bruce Lyons  

E-Print Network (OSTI)

on the internationally standard 2-phase investigation structure and remedy negotiations of the form practiced by the EC jurisdictions, remedies can be agreed in either phase of investigation. In particular, both the EU and US merger regulations allow remedies to be agreed in either phase of the investigation. Either de jure (as in the EU

Feigon, Brooke

60

Preliminary Notice of Violation, Westinghouse Savannah River Company - EA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Preliminary Notice of Violation, Westinghouse Savannah River Preliminary Notice of Violation, Westinghouse Savannah River Company - EA 98-09 Preliminary Notice of Violation, Westinghouse Savannah River Company - EA 98-09 September 21, 1998 Preliminary Notice of Violation issued to Westinghouse Savannah River Company, related to Bioassay Program Deficiencies at the Savannah River Site, (EA-98-09) This letter refers to the Department of Energy's (DOE) investigation of the facts and circumstances concerning deficiencies in Westinghouse Savannah River Company's (WSRC) bioassay participation requirements and WSRC's corrective actions to remedy those deficiencies. Preliminary Notice of Violation, Westinghouse Savannah River Company - EA 98-09 More Documents & Publications Preliminary Notice of Violation, Westinghouse Savannah River Company -

Note: This page contains sample records for the topic "risk-based preliminary remediation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

A practical approach to risk-based inservice inspection in U.S. nuclear power plants  

SciTech Connect

To provide guidelines for practical implementation of risk-based ISI, EPRI sponsored work to develop evaluation procedures and criteria for defining risk-based inservice inspection programs for nuclear power plant piping. These procedures and criteria include efficient means to identify risk significant piping segments, inspection locations, and available inspection techniques. These procedures were applied in a pilot study to assess the feasibility of successfully implementing risk-based inservice inspection programs at nuclear plants. The results from the pilot study indicate that implementation of risk-based inservice inspection programs can reduce the cost and radiation exposure associated with inservice inspection, while maintaining a high level of safety. The list of references provides additional details of these procedures and plant-specific applications. Also, an EPRI technical report has been published to document these procedures. Software has been developed to support and fully document this procedure. Additional development is adding an expert system to the present data base system. The approach compares well to approaches used (or being considered) in other industries and can easily be adapted to these other industries and to address economic and personnel safety in addition to public safety measures.

Gosselin, S.R. [Electric Power Research Inst., Charlotte, NC (United States); Gamble, R. [Sartrex Corp., Rockville, MD (United States); Dimitrijevic, V.B.; O`Regan, P.J.; Chapman, J.R. [Yankee Atomic Electric Co., Bolton, MS (United States)

1996-12-01T23:59:59.000Z

62

Algorithmic Decision Theory and Risk-based Decision Making in the  

E-Print Network (OSTI)

1 Algorithmic Decision Theory and Risk-based Decision Making in the Maritime Environment Fred S. Roberts Director of CCICADA Rutgers University #12;2 Algorithmic Decision Theory ·Today's decision makers speeds and quantities 2 #12;3 Algorithmic Decision Theory ·These tools and resources will enable better

63

Preliminary Notice of Violation EA 97-04  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Clegg Crawford Clegg Crawford [ ] Rocky Mountain Remediation Services, L.L.C. Rocky Flats Environmental Technology Site P.O. Box 464 Golden, CO 80402-0464 EA 97-04 Subject: Preliminary Notice of Violation (NTS-RFO--KHLL-ENVOPS-1996-0001) Dear Mr. Crawford: This letter refers to the Department of Energy's (DOE) evaluation of noncompliances associated with the dispersal of radioactive material during the remediation of trenches [ ]. On October 9, 1996, Kaiser-Hill Company, L.L.C. (KHLL), submitted Noncompliance Tracking System (NTS) report NTS-RFO--KHLL-ENVOPS-1996-0001 that described the release of radioactive material during compaction of a radioactively contaminated drum carcass in support of the remediation of trenches [ ] located [at] the Rocky Flats site. The actual work was performed by Rocky Mountain Remediation Services, L.L.C.

64

Summary Protocol: Identification, Characterization, Designation, Remedial  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summary Protocol: Identification, Characterization, Designation, Summary Protocol: Identification, Characterization, Designation, Remedial Action, Certification Summary Protocol: Identification, Characterization, Designation, Remedial Action, Certification Summary Protocol: Identification, Characterization, Designation, Remedial Action, Certification (January 1986) Summary Protocol: Identification, Characterization, Designation, Remedial Action, Certification (January 1986) More Documents & Publications Supplement No. 1 to the FUSRAP Summary Protocol - Designation/Elimination Protocol Pre-MARSSIM Surveys in a MARSSIM World: Demonstrating How Pre-MARSSIM Radiological Data Demonstrate Protectiveness at Formerly Utilized Sites Remedial Action Program Sites U.S. Department of Energy Guidelines for Residual Radioactive Material at

65

Soil & Groundwater Remediation | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Soil & Groundwater Soil & Groundwater Remediation Soil & Groundwater Remediation Soil & Groundwater Remediation The U.S. Department of Energy (DOE) manages the largest groundwater and soil remediation effort in the world. The inventory at the DOE sites includes 6.5 trillion liters of contaminated groundwater, an amount equal to about four times the daily U.S. water consumption, and 40 million cubic meters of soil and debris contaminated with radionuclides, metals, and organics. The Office of Groundwater and Soil Remediation is working with DOE site managers around the country regarding specific technical issues. At the large sites such as Hanford, Savannah River, and Oak Ridge, the Office of Groundwater and Soil Remediation has conducted research and demonstration projects to test new technologies and remediation

66

Risk assessment and optimization (ALARA) analysis for the environmental remediation of Brookhaven National Laboratory`s hazardous waste management facility  

SciTech Connect

The Department of Energy`s (DOE) Office of Environment, Safety, and Health (EH) sought examples of risk-based approaches to environmental restoration to include in their guidance for DOE nuclear facilities. Extensive measurements of radiological contamination in soil and ground water have been made at Brookhaven National Laboratory`s Hazardous Waste Management Facility (HWMF) as part of a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) remediation process. This provided an ideal opportunity for a case study. This report provides a risk assessment and an {open_quotes}As Low as Reasonably Achievable{close_quotes} (ALARA) analysis for use at other DOE nuclear facilities as an example of a risk-based decision technique.

Dionne, B.J.; Morris, S. III; Baum, J.W. [and others

1998-03-01T23:59:59.000Z

67

Field Summary Report for Remedial Investigation of Hanford Site Releases to the Coumbia River, Hanford Site, Washington  

SciTech Connect

This report summarizes field sampling activities conducted in support of WCH’s Remedial Investigation of Hanford Site Releases to the Columbia River. This work was conducted form 2008 through 2010. The work included preliminary mapping and measurement of Hanford Site contaminants in sediment, pore water, and surface water located in areas where groundwater upwelling were found.

L.C. Hulstrom

2010-11-10T23:59:59.000Z

68

Microsoft PowerPoint - S05-04_Hoffman_Risk-Based Corrosion.ppt  

NLE Websites -- All DOE Office Websites (Extended Search)

Based Corrosion Studies at SRS Based Corrosion Studies at SRS EM Waste Processing Technical Exchange 2010 E.N. Hoffman Senior Engineer A Savannah River National Laboratory November 17th, 2010 SRNL-STI-2010-00692 Print Close 2 Risk Based Corrosion Studies at SRS, SRNL-STI-2010-00692 Contributors Tommy Edwards, SRNL Tracy Murphy, SRNL Bruce Wiersma, SRNL Philip Zapp, SRNL Brenda Garcia-Diaz, SRNL Print Close 3 Risk Based Corrosion Studies at SRS, SRNL-STI-2010-00692 Type III 1.3 Mgal 1966-1981 Type I 750 kgal 1951-1953 Type II 1.0 Mgal 1955-1956 SRS Waste Tank Design and Fabrication TYPE I and II (ASTM 285-B) Experienced stress corrosion cracking (SCC) 2 have been closed; 22 scheduled for closure by 2017 No active leak sites today TYPE III (ASTM A516-70 and A537 Class I) * Post-fabrication relief of weld residual stresses

69

RCRA closure of an explosive ordnance disposal (EOD) range, Wright-Patterson Air Force Base, Ohio: Circumstances leading to a risk based approach  

SciTech Connect

After approximately 40 years of operation of an Explosive Ordnance Disposal (EOD) Range at Wright-Patterson Air Force Base (WPAFB) near Dayton, Ohio, operations were suspended in late 1990 by the Ohio Environmental Protection Agency (OEPA). The closure of several notice of violations and reopening of the EOD Range were the initial objectives, but in 1995 a formal commitment for RCRA closure was made. The EOD Range, used for disposal of ordnance via open burning and open detonation, is a fenced 5 acre site and is located in a 100 year flood plain. Investigations performed in 1991 through 1994 to fully characterize the site indicated the presence of heavy metals and petroleum contamination in soils. Of particular concern were elevated levels of arsenic and lead. Localized remediations were attempted in 1993, but because of continued disagreement on cleanup levels with OEPA, these remediations were unsuccessful. Strict interpretation of OEPA RCRA closure guidance would have required the removal of soil from the entire five acre EOD Range to a depth of 4--5 feet, at a cost of approximately $6,000,000. However, in early 1995 a partnering session held with OEPA led to an improved regulatory relationship with OEPA. This improved relationship, along with new information compiled on industrial background concentrations of heavy metals at RCRA sites in Ohio, and emerging OEPA guidance on broader risk ranges for closure may prove to be key in reducing closure requirements. A draft Closure Plan has been submitted to OEPA which proposes a risk-based approach for closure. The plan is currently under review by OEPA. If approved, the AF could realize a substantial savings of greater than $5,000,000. This paper details the sequence of events in performing a RCRA closure at the EOD range, including the site conditions and field activities, and the evolution of closure requirements.

Tumbusch, C. [Air Force, Wright-Patterson AFB, OH (United States). Office of Environmental Management; Martin, J. [International Technology Corp., Cincinnati, OH (United States)

1997-12-31T23:59:59.000Z

70

Isis: An expert system for risk-based inservice inspection assessment  

SciTech Connect

The ASME Section XI Working Group on Implementation of Risk-Based (RB) Examination produced a code case to define risk-based selection rules that could be used for In-Service Inspection (ISI) of Class 1, 2 and 3 piping. To provide guidelines for practical implementation of the code case, EPRI sponsored work to develop evaluation procedures and criteria. The approach focuses inspections on locations which are selected based upon an explicit consideration of experienced degradation mechanisms and potential consequences. Software has been developed to execute and document this approach. Data and expert system modules address system operating characteristics, design attributes, the potential for damage mechanisms and the impact of component failures (i.e., loss of pressure boundary integrity). These modules are integrated in a stand alone software package. In addition, because the system is microcomputer based, the software is not cumbersome or costly to deploy. The goal of this effort was to develop a tool that will accomplish two tasks. That is, (1) Reduce the cost of the Risk Based Inservice Inspection (RBISI) evaluation effort by increasing the productivity of the BISI analyst, and (2) Provide a structured analytical and documentation package that lends itself to increases in consistency within an individual plant application, as well as across the industry.

Barbetta, N.L.; Dimitrijevic, V.B.; Eivers, G.D.; O`Regan, P.J. [Yankee Nuclear Services Division, Bolton, MA (United States)

1996-12-01T23:59:59.000Z

71

X-701B Groundwater Remedy Portsmouth Ohio  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

X-701B Groundwater Remediation X-701B Groundwater Remediation ETR Report Date: December 2008 ETR-20 United States Department of Energy Office of Environmental Management (DOE-EM) External Technical Review of the X-701B Groundwater Remedy, Portsmouth, Ohio Why DOE-EM Did This Review The Department of Energy (DOE) Portsmouth Paducah Project Office (PPPO) has responsibility for remediation of the X-701B ground water plume with the key contaminant of trichloroethene (TCE). The remedy has been divided into four phases: Phase I- Initial Source Area Treatment, Phase II-Expanded Source Area Treatment, Phase III-Evaluation and Reporting, and Phase IV- Downgradient Remediation and Confirmation of Source Area Treatment. Phase II treatment has injected

72

DOE Selects CH2M Hill Plateau Remediation Company for Plateau Remediation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CH2M Hill Plateau Remediation Company for Plateau CH2M Hill Plateau Remediation Company for Plateau Remediation Contract at its Hanford Site DOE Selects CH2M Hill Plateau Remediation Company for Plateau Remediation Contract at its Hanford Site June 19, 2008 - 1:29pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that CH2M Hill Plateau Remediation Company has been selected as the plateau remediation contractor for DOE's Hanford Site in southeastern Washington State. The contract is a cost-plus award-fee contract valued at approximately $4.5 billion over ten years (a five-year base period with the option to extend it for another five years). CH2M Hill Plateau Remediation Company is a limited liability company formed by CH2M Hill Constructors, Inc. The team also includes AREVA Federal

73

Summary - Mitigation and Remediation of Mercury Contamination...  

Office of Environmental Management (EM)

and surface water Hg remediation strategy for adequacy in reducing Hg levels in the fish and to indentify opportunities to achieve cost and technical improvements andor to...

74

Savannah River Remediation (SRR) Expanded Staff Meeting  

NLE Websites -- All DOE Office Websites (Extended Search)

Savannah River Remediation Delivering the Mission Dave Olson President and Project Manager January 27, 2012 SRS Executive Management Community Discussion 2 * Liquid Waste Funding...

75

Recommendation 192: Comments on Remediation Effectiveness Report  

Energy.gov (U.S. Department of Energy (DOE))

The ORSSAB Recommendations and Comments on the Draft 2010 Remediation Effectiveness Report for the U.S. Department of Energy Oak Ridge Reservation.

76

Consideration of Reliability in System Design for Ground Water Remediation  

Science Journals Connector (OSTI)

A remedial action design system is described that may be used to evaluate candidate remediation systems and select the preferred alternative under conditions of uncertainty. The remedial action design method i...

W. Woldt; I. Bogardi; L. Duckstein

1991-01-01T23:59:59.000Z

77

Groundwater Remediation Strategy Using Global Optimization Algorithms  

E-Print Network (OSTI)

. DOI: 10.1061/ ASCE 0733-9496 2002 128:6 431 CE Database keywords: Ground water; Remedial action; Algorithms; Ground-water management. Introduction The contamination of groundwater is a widespread problemGroundwater Remediation Strategy Using Global Optimization Algorithms Shreedhar Maskey1 ; Andreja

Neumaier, Arnold

78

Remediation of the Maxey Flats Site  

SciTech Connect

This report describes issues associated with remedial action of Maxey Flats, a low-level radioactive waste disposal site from 1963-1977, located in Fleming County, Kentucky. Present remedial action alternatives being considered are discussed along with emergency plans, ground water monitoring plans, and budgets.

Not Available

1990-01-12T23:59:59.000Z

79

Experience with the implementation of a risk-based ISI program and inspection qualification  

SciTech Connect

Rolls Royce and Associates (RRA) are the Design Authority (DA) for Nuclear Steam Raising Plant (NSRP) used for the Royal Naval Nuclear Fleet. Over the past seven years RRA, with support from the Ministry of Defense, has developed and implemented a risk based in-service inspection (RBISI) strategy for the NSRP. Having used risk as a means of optimizing where to inspect, an inspection qualification (IQ) process has now been put in place to ensure that proposed inspections deliver the expected gains assumed. This qualification process follows very closely that currently being put forward by the European Network on Inspection Qualification (ENIQ).

Chapman, O.J.V. [Rolls Royce and Associates Ltd., Derby (United Kingdom)

1996-12-01T23:59:59.000Z

80

Agencies plan continued DOE landfill remediation  

NLE Websites -- All DOE Office Websites (Extended Search)

Agencies plan continued DOE landfill remediation Agencies plan continued DOE landfill remediation The U.S. Department of Energy (DOE), Idaho Department of Environmental Quality and U.S. Environmental Protection Agency have released a planning document that specifies how DOE will continue to remediate a landfill containing hazardous and transuranic waste at DOE's Idaho Site located in eastern Idaho. The Phase 1 Remedial Design/Remedial Action Work Plan for Operable Unit 7-13/14 document was issued after the September 2008 Record of Decision (ROD) and implements the retrieval of targeted waste at the Subsurface Disposal Area (SDA) within the Radioactive Waste Management Complex (RWMC). The SDA began receiving waste in 1952 and contains radioactive and chemical waste in approximately 35 acres of disposal pits, trenches and soil vaults.

Note: This page contains sample records for the topic "risk-based preliminary remediation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Remediation of Mercury and Industrial Contaminants Applied Field...  

Office of Environmental Management (EM)

Remediation of Mercury and Industrial Contaminants Applied Field Research Initiative (RoMIC-AFRI) Remediation of Mercury and Industrial Contaminants Applied Field Research...

82

Building C-400 Thermal Treatment 90% Remedial Design Report and...  

Energy Savers (EERE)

Building C-400 Thermal Treatment 90% Remedial Design Report and Site Investigation Building C-400 Thermal Treatment 90% Remedial Design Report and Site Investigation Full Document...

83

Groundwater remediation technologies for trichloroethylene and technetium-99.  

E-Print Network (OSTI)

??M. Eng. The Technical Advisory Group (TAG) of the Innovative Treatment Remediation Demonstration Program (ITRD) made technology recommendations after reviewing thirty in situ remediation technologies… (more)

Uhl, John Nicholas, 1960-

2005-01-01T23:59:59.000Z

84

Surfactant-enhanced electrokinetic remediation of hydrocarbon-contaminated soils.  

E-Print Network (OSTI)

??Concern over soil and groundwater contamination has created a demand for new and efficient remediation technologies. Surfactant-enhanced electrokinetic remediation is an innovative technique which has… (more)

Thomas, Steven P.

2012-01-01T23:59:59.000Z

85

Operable Unit 3-14, Tank Farm Soil and INTEC Groundwater Remedial Design/Remedial Action Scope of Work  

SciTech Connect

This Remedial Design/Remedial Action (RD/RA) Scope of Work pertains to OU 3-14 Idaho Nuclear Technology and Engineering Center and the Idaho National Laboratory and identifies the remediation strategy, project scope, schedule, and budget that implement the tank farm soil and groundwater remediation, in accordance with the May 2007 Record of Decision. Specifically, this RD/RA Scope of Work identifies and defines the remedial action approach and the plan for preparing the remedial design documents.

D. E. Shanklin

2007-07-25T23:59:59.000Z

86

Innovative vitrification for soil remediation  

SciTech Connect

The objective of this DOE demonstration program is to validate the performance and operation of the Vortec Cyclone Melting System (CMS{trademark}) for the processing of LLW contaminated soils found at DOE sites. This DOE vitrification demonstration project has successfully progressed through the first two phases. Phase 1 consisted of pilot scale testing with surrogate wastes and the conceptual design of a process plant operating at a generic DOE site. The objective of Phase 2, which is scheduled to be completed the end of FY 95, is to develop a definitive process plant design for the treatment of wastes at a specific DOE facility. During Phase 2, a site specific design was developed for the processing of LLW soils and muds containing TSCA organics and RCRA metal contaminants. Phase 3 will consist of a full scale demonstration at the DOE gaseous diffusion plant located in Paducah, KY. Several DOE sites were evaluated for potential application of the technology. Paducah was selected for the demonstration program because of their urgent waste remediation needs as well as their strong management and cost sharing financial support for the project. During Phase 2, the basic nitrification process design was modified to meet the specific needs of the new waste streams available at Paducah. The system design developed for Paducah has significantly enhanced the processing capabilities of the Vortec vitrification process. The overall system design now includes the capability to shred entire drums and drum packs containing mud, concrete, plastics and PCB`s as well as bulk waste materials. This enhanced processing capability will substantially expand the total DOE waste remediation applications of the technology.

Jetta, N.W.; Patten, J.S.; Hart, J.G.

1995-12-01T23:59:59.000Z

87

Preliminary Impact Evaluation BBNP  

Energy.gov (U.S. Department of Energy (DOE))

Preliminary Impact Evaluation of the U.S. Department of Energy's Better Buildings Neighborhood Program, 2013.

88

Application of risk-based methods to inservice inspection of piping systems  

SciTech Connect

Research efforts have been underway in the American Society of Mechanical Engineers (ASME) and industry to define appropriate methods for the application of risk-based technology in the development of inservice inspection (ISI) programs for piping systems in nuclear power plants. This paper discusses a pilot application of these methods to the inservice inspection of piping systems of Northeast Utilities Millstone Unit 3 nuclear power station. This demonstration study, which has been sponsored by the Westinghouse Owners Group (WOG), applies probabilistic safety assessment (PSA) models that have already been developed to meet regulatory requirements for an individual plant examination (IPE). The approach calculates the relative importance for each component within the systems of interest. This risk-importance is based on the frequency of core damage resulting from the structural failure of the component. The process inductively determines the effects that such failures have on the desired operational characteristics of the system being analyzed. Structural reliability/risk assessment (SRRA) models based on probabilistic structural mechanics methods are used to estimate failure probabilities for important components. Locations within a system with varying failure probabilities can be defined to focus ISI resources. This paper will discuss the above process and results to show that application of risk-based methods in the development of ISI programs can potentially result in significant savings while maintaining a high level of safety.

Closky, N.B.; Balkey, K.R. [Westinghouse Electric Corp., Pittsburgh, PA (United States); Oswald, E.; West, R. [Northeast Utilities, Hartford, CT (United States)

1996-12-01T23:59:59.000Z

89

Linking deposit morphology and clogging in subsurface remediation: Final Technical Report  

SciTech Connect

Groundwater is a crucial resource for water supply, especially in arid and semiarid areas of the United States west of the 100th meridian. Accordingly, remediation of contaminated groundwater is an important application of science and technology, particularly for the U.S. Department of Energy (DOE), which oversees a number of groundwater remediation sites from Cold War era mining. Groundwater remediation is complex, because it depends on identifying, locating, and treating contaminants in the subsurface, where remediation reactions depend on interacting geological, hydrological, geochemical, and microbiological factors. Within this context, permeability is a fundamental concept, because it controls the rates and pathways of groundwater flow. Colloid science is intimately related to permeability, because when colloids are present (particles with equivalent diameters between 1 nanometer and 10 micrometers), changes in hydrological or geochemical conditions can trigger a detrimental reduction in permeability called clogging. Accordingly, clogging is a major concern in groundwater remediation. Several lines of evidence suggest that clogging by colloids depends on (1) colloid deposition, and (2) deposit morphology, that is, the structure of colloid deposits, which can be quantified as a fractal dimension. This report describes research, performed under a 2-year, exploratory grant from the DOE’s Subsurface Biogeochemical Research (SBR) program. This research employed a novel laboratory technique to simultaneously measure flow, colloid deposition, deposit morphology, and permeability in a flow cell, and also collected field samples from wells at the DOE’s Old Rifle remediation site. Field results indicate that suspended solids at the Old Rifle site have fractal structures. Laboratory results indicate that clogging is associated with colloid deposits with smaller fractal dimensions, in accordance with previous studies on initially clean granular media. Preliminary modeling has identified the deposit radius of gyration as a candidate variable to account for clogging as a function of (1) colloid accumulation and (2) deposit morphology.

Mays, David C. [University of Colorado Denver

2013-12-11T23:59:59.000Z

90

Applied Field Research Initiative Attenuation Based Remedies  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PA00133 - March 2011 PA00133 - March 2011 Applied Field Research Initiative Attenuation Based Remedies in the Subsurface Located at the Savannah River Site in Aiken, South Carolina, the Attenuation-Based Remedies in the Subsurface Applied Field Research Initiative (ABRS AFRI) was established to develop the tools, approaches and technologies that will be required to address the technical challenges associated characteriza- tion, remediation and long-term monitoring of recalcitrant compounds in the subsurface at Department of Energy (DOE) Environmental Management (EM) sites. The ABRS AFRI site provides a unique setting for researchers in both applied and basic science fields. A wealth of subsurface data is available to support research activities and remedial decision making.

91

Remediation of Mercury and Industrial Contaminants  

Energy.gov (U.S. Department of Energy (DOE))

The mission of the Remediation of Mercury and Industrial Contaminants Applied Field Research Initiative is to control the flux of contaminants in soil and water environments for the purpose of...

92

Engineered Polymeric Nanoparticles for Soil Remediation  

Science Journals Connector (OSTI)

compds. in soil-water systems in which surfactants play a role in contaminant remediation or facilitated transport. ... (9)?Abdul, A. S.; Ang, C. C. Ground Water 1994, 32, 727. ...

Warapong Tungittiplakorn; Leonard W. Lion; Claude Cohen; Ju-Young Kim

2004-01-28T23:59:59.000Z

93

SITE MAINTENANCE PLAN CSMRI SITE REMEDIATION  

E-Print Network (OSTI)

...............................................................................................................5 5.2 Ground and Surface Water MonitoringSITE MAINTENANCE PLAN CSMRI SITE REMEDIATION June 29, 2004 Prepared by: Colorado School of Mines .................................................................................................4 5.0 SITE AIR AND WATER MONITORING

94

Avoiding Destructive Remediation at DOE Sites  

Science Journals Connector (OSTI)

...Pollutants, Radioactive 0 Water Pollutants, Radioactive...States Government Agencies Water Pollutants, Radioactive...management government agencies ground water policy pollutants pollution...pumping radioactive waste remediation risk assessment soils...

F. W. Whicker; T. G. Hinton; M. M. MacDonell; J. E. Pinder III; L. J. Habegger

2004-03-12T23:59:59.000Z

95

In situ Groundwater Remediation Using Treatment Walls  

Science Journals Connector (OSTI)

Development of treatment wall technology for the clean up of contaminated ground-water resources has expanded in the past few...ex situ and other in situ ground-water remediation approaches is reduced operation a...

Radisav D. Vidic; Frederick G. Pohland

2002-01-01T23:59:59.000Z

96

Electrolytic remediation of chromated copper arsenate wastes  

E-Print Network (OSTI)

While chromated copper arsenate (CCA) has proven to be exceptionally effective in protecting wood from rot and infestation, its toxic nature has led to the problem of disposal of CCA-treated lumber and remediation of waters ...

Stern, Heather A. G. (Heather Ann Ganung)

2006-01-01T23:59:59.000Z

97

SAMPLING AND ANALYSIS PLAN CSMRI SITE REMEDIATION  

E-Print Network (OSTI)

Littleton, CO 80127 #12;CSMRI Site Remediation Quality Assurance Project Plan March 30, 2004 SAMPLING Environmental Consultants, Inc. Approved By: Date: Sally Cuffin Project Quality Assurance Manager New Horizons...................................................................................................................................3 2.5 Decision Rules

98

Options for improving hazardous waste cleanups using risk-based criteria  

SciTech Connect

This paper explores how risk- and technology-based criteria are currently used in the RCRA and CERCLA cleanup programs. It identifies ways in which risk could be further incorporated into RCRA and CERCLA cleanup requirements and the implications of risk-based approaches. The more universal use of risk assessment as embodied in the risk communication and risk improvement bills before Congress is not addressed. Incorporating risk into the laws and regulations governing hazardous waste cleanup, will allow the use of the best scientific information available to further the goal of environmental protection in the United States while containing costs. and may help set an example for other countries that may be developing cleanup programs, thereby contributing to enhanced global environmental management.

Elcock, D.

1995-06-01T23:59:59.000Z

99

Operable Unit 3-13, Group 3, Other Surface Soils Remediation Sets 4-6 (Phase II) Remedial Design/Remedial Action Work Plan  

SciTech Connect

This Remedial Design/Remedial Action Work Plan provides the framework for defining the remedial design requirements, preparing the design documentation, and defining the remedial actions for Waste Area Group 3, Operable Unit 3-13, Group 3, Other Surface Soils, Remediation Sets 4-6 (Phase II) located at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory. This plan details the design developed to support the remediation and disposal activities selected in the Final Operable Unit 3-13, Record of Decision.

D. E. Shanklin

2006-06-01T23:59:59.000Z

100

A computational framework for risk-based power systems operations under uncertainty. Part I: Theory  

Science Journals Connector (OSTI)

Abstract With larger penetrations of wind power, the uncertainty increases in power systems operations. The wind power forecast errors must be accounted for by adapting existing operating tools or designing new ones. A switch from the deterministic framework used today to a probabilistic one has been advocated. This two-part paper presents a framework for risk-based operations of power systems. This framework builds on the operating risk defined as the probability of the system to be outside the stable operation domain, given probabilistic forecasts for the uncertainty (load and wind power generation levels) and outage rates of chosen elements of the system (generators and transmission lines). This operating risk can be seen as a probabilistic formulation of the N ? 1 criterion. The stable operation domain is defined by voltage-stability limits, small-signal stability limits, thermal stability limits and other operating limits. In Part I of the paper, a previous method for estimating the operating risk is extended by using a new model for the joint distribution of the uncertainty. This new model allows for a decrease in computation time of the method, which allows for the use of later and more up-to-date forecasts. In Part II, the accuracy and the computation requirements of the method using this new model will be analyzed and compared to the previously used model for the uncertainty. The method developed in this paper is able to tackle the two challenges associated with risk-based real-time operations: accurately estimating very low operating risks and doing so in a very limited amount of time.

Camille Hamon; Magnus Perninge; Lennart Söder

2015-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "risk-based preliminary remediation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Hazardous waste treatment and environmental remediation research  

SciTech Connect

Los Alamos National Laboratory (LANL) is currently evaluating hazardous waste treatment and environmental remediation technologies in existence and under development to determine applicability to remediation needs of the DOE facilities under the Albuquerque Operations Office and to determine areas of research need. To assist LANL is this effort, Science Applications International Corporation (SAIC) conducted an assessment of technologies and monitoring methods that have been demonstrated or are under development. The focus of this assessment is to: (1) identify existing technologies for hazardous waste treatment and environmental remediation of old waste sites; (2) identify technologies under development and the status of the technology; (3) assess new technologies that need development to provide adequate hazardous waste treatment and remedial action technologies for DOD and DOE sites; and (4) identify hazardous waste and remediation problems for environmental research and development. There are currently numerous research and development activities underway nationwide relating to environmental contaminants and the remediation of waste sites. To perform this effort, SAIC evaluated current technologies and monitoring methods development programs in EPA, DOD, and DOE, as these are the primary agencies through which developmental methods are being demonstrated. This report presents this evaluation and provides recommendations as to pertinent research needs or activities to address waste site contamination problems. The review and assessment have been conducted at a programmatic level; site-specific and contaminant-specific evaluations are being performed by LANL staff as a separate, related activity.

Not Available

1989-09-29T23:59:59.000Z

102

Overview of Green and Sustainable Remediation for Soil and Groundwater Remediation - 12545  

SciTech Connect

Making remediation efforts more 'sustainable' or 'green' is a topic of great interest in the remediation community. It has been spurred on by Executive Orders from the White House, as well as Department of Energy (DOE) sustainability plans. In private industry, it is motivated by corporate sustainability goals and corporate social responsibility. It has spawned new organizations, areas of discussion, tools and practices, and guidance documents around sustainable remediation or green remediation. Green remediation can be thought of as a subset of sustainable remediation and is mostly focused on reducing the environmental footprint of cleanup efforts. Sustainable remediation includes both social and economic considerations, in addition to environmental. Application of both green and sustainable remediation (GSR) may involve two primary activities. The first is to develop technologies and alternatives that are greener or more sustainable. This can also include making existing remediation approaches greener or more sustainable. The second is to include GSR criteria in the evaluation of remediation alternatives and strategies. In other words, to include these GSR criteria in the evaluation of alternatives in a feasibility study. In some cases, regulatory frameworks allow the flexibility to include GSR criteria into the evaluation process (e.g., state cleanup programs). In other cases, regulations allow less flexibility to include the evaluation of GSR criteria (e.g., Comprehensive Environmental Response Compensation, and Liability Act (CERCLA)). New regulatory guidance and tools will be required to include these criteria in typical feasibility studies. GSR provides a number of challenges for remediation professionals performing soil and groundwater remediation projects. Probably the most significant is just trying to stay on top of the ever changing landscape of products, tools, and guidance documents coming out of various groups, the US EPA, and states. However, this process also provides new opportunities to think differently and look at the bigger picture of the overall benefit we are providing with our remediation projects. The opportunities from the move towards GSR are very real. They will help us make remedial actions truly more beneficial to the environment and to society. They will also allow (or force) remediation practitioners to think outside of the usual realm of approaches to find newer and more beneficial technologies. (authors)

Simpkin, Thomas J. [CH2M HILL, Denver, Colorado (United States); Favara, Paul [CH2M HILL, Gainesville, Florida (United States)

2012-07-01T23:59:59.000Z

103

Application of EPRI risk-based inservice inspection procedure to combustion engineering design of nuclear power plant  

SciTech Connect

The EPRI developed risk-based inservice inspection procedure is used to select the elements for inservice inspection on a section of the high pressure safety injection system of the Entergy Operations ANO2 nuclear plant. This plant is the pilot plant in a six utility-eleven plant EPRI tailored collaboration program to apply the general EPRI procedures to Combustion Engineering NSSS designs. The procedure results in a reduction of candidate inspection locations from 14, based on current ASME Section XI rules for B-J welds to 3, based on the risk-based selection criteria.

Lubin, B.T. [ABB Combustion Engineering, Windsor, CT (United States). Nuclear Operations; Fourgerousse, R. [Entergy Operations-ANO2, Russellville, AR (United States)

1996-12-01T23:59:59.000Z

104

In Situ Remediation Integrated Program: Technology summary  

SciTech Connect

The In Situ Remediation Integrated Program (ISR IP) was instituted out of recognition that in situ remediation could fulfill three important criteria: significant cost reduction of cleanup by eliminating or minimizing excavation, transportation, and disposal of wastes; reduced health impacts on workers and the public by minimizing exposure to wastes during excavation and processing; and remediation of inaccessible sites, including: deep subsurfaces, in, under, and around buildings. Buried waste, contaminated soils and groundwater, and containerized wastes are all candidates for in situ remediation. Contaminants include radioactive wastes, volatile and non-volatile organics, heavy metals, nitrates, and explosive materials. The ISR IP intends to facilitate development of in situ remediation technologies for hazardous, radioactive, and mixed wastes in soils, groundwater, and storage tanks. Near-term focus is on containment of the wastes, with treatment receiving greater effort in future years. ISR IP is an applied research and development program broadly addressing known DOE environmental restoration needs. Analysis of a sample of 334 representative sites by the Office of Environmental Restoration has shown how many sites are amenable to in situ remediation: containment--243 sites; manipulation--244 sites; bioremediation--154 sites; and physical/chemical methods--236 sites. This needs assessment is focused on near-term restoration problems (FY93--FY99). Many other remediations will be required in the next century. The major focus of the ISR EP is on the long term development of permanent solutions to these problems. Current needs for interim actions to protect human health and the environment are also being addressed.

Not Available

1994-02-01T23:59:59.000Z

105

Multiscale modeling of surfactant phase behavior in the remediation of DNAPL contamination.  

E-Print Network (OSTI)

??The brine barrier remediation technique (BBRT) has been proposed as a novel Brine barrier remediation techniques (BBRT) that use surfactants have been proposed for remediating… (more)

Fan, Xiangyu.

2008-01-01T23:59:59.000Z

106

Remediation of water contamination using catalytic technologies  

Science Journals Connector (OSTI)

Remediation of contaminated ground and underground water is becoming a critical issue in Europe and worldwide. We discuss here the role of catalysis in water remediation, with reference to two specific examples of catalytic water remediation technologies: (i) the elimination of nitrate and pesticides from water contaminated as a result of agricultural practices and (ii) the conversion of methyl tert-butyl ether (MTBE) in contaminated underground water. Of particular interest is a technology based on catalytic membranes for remediation of water contaminated by nitrate, which offers various advantages with respect to conventional technologies. Using a Pd-Cu-based catalytic membrane, a reaction temperature below 15 °C, a mixed 4:1 CO2:H2 feed and controlling bulk solution pH by \\{HCl\\} addition, it is possible to obtain a nitrate conversion higher than 80% even with ammonium ion formation below 0.5 ppm, i.e. the maximum concentration allowed to meet the requirements for drinking water quality. In MTBE conversion in contaminated underground water, acid zeolites with suitable pore structures (channel structure and pore openings) such as H-ZSM-5 and H-BEA can be used as catalytic permeable reactive barriers for in situ remediation. These zeolites not only act as adsorbents for both MTBE and its reaction products, but also effectively catalyze the hydrolysis of MTBE to t-butyl alcohol (TBA) and methanol (MeOH) which then can be rapidly biodegraded by indigenous microorganisms.

Gabriele Centi; Siglinda Perathoner

2003-01-01T23:59:59.000Z

107

ICDF Complex Remedial Action Work Plan  

SciTech Connect

This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

W. M. Heileson

2006-12-01T23:59:59.000Z

108

Risk-based Inspection Scheduling Planning for Intelligent Agent in the Autonomous Fault Management  

SciTech Connect

This paper developed an autonomous fault management focusing to the inspection scheduling planning which was implemented to the advanced small nuclear reactor without on-site refuelling to assure the safety without human intervention. The inspection scheduling planning was developed optimally on the risk-based approach compromising between two important constraints related to the risk of action planning as such failure probability and shortest path. Performance was represented using computer simulation implemented to the DURESS components location and failure probability. It could be concluded that the first priority to be inspected was flow sensor FB2 which had the largest comparation value of 0.104233 comparing with the other components. The next route would be visited were sequentially FB1, FA2, FA1, FB, FA, VB, pump B, VA, pump A, VB2, VB1, VA2, VA1, reservoir 2, reservoir 1, FR2, and FR1. The movement route planning could be transferred to activate the robot arm which reflected as intelligent agent.

Hari Nugroho, Djoko; Sudarno [Center for Reactor Technology and Nuclear Safety-BATAN, Indonesia Building no 80 PUSPIPTEK Area, Serpong (Indonesia)

2010-06-22T23:59:59.000Z

109

Auxiliary feedwater system risk-based inspection guide for the Byron and Braidwood nuclear power plants  

SciTech Connect

In a study sponsored by the US Nuclear Regulatory Commission (NRC), Pacific Northwest Laboratory has developed and applied a methodology for deriving plant-specific risk-based inspection guidance for the auxiliary feedwater (AFW) system at pressurized water reactors that have not undergone probabilistic risk assessment (PRA). This methodology uses existing PRA results and plant operating experience information. Existing PRA-based inspection guidance information recently developed for the NRC for various plants was used to identify generic component failure modes. This information was then combined with plant-specific and industry-wide component information and failure data to identify failure modes and failure mechanisms for the AFW system at the selected plants. Byron and Braidwood were selected for the fourth study in this program. The produce of this effort is a prioritized listing of AFW failures which have occurred at the plants and at other PWRs. This listing is intended for use by NRC inspectors in the preparation of inspection plans addressing AFW risk-important components at the Byron/Braidwood plants. 23 refs., 1 fig., 1 tab.

Moffitt, N.E.; Gore, B.F.: Vo, T.V. (Pacific Northwest Lab., Richland, WA (USA))

1991-07-01T23:59:59.000Z

110

Auxiliary feedwater system risk-based inspection guide for the H. B. Robinson nuclear power plant  

SciTech Connect

In a study sponsored by the US Nuclear Regulatory Commission (NRC), Pacific Northwest Laboratory has developed and applied a methodology for deriving plant-specific risk-based inspection guidance for the auxiliary feedwater (AFW) system at pressurized water reactors that have not undergone probabilistic risk assessment (PRA). This methodology uses existing PRA results and plant operating experience information. Existing PRA-based inspection guidance information recently developed for the NRC for various plants was used to identify generic component failure modes. This information was then combined with plant-specific and industry-wide component information and failure data to identify failure modes and failure mechanisms for the AFW system at the selected plants. H. B. Robinson was selected as one of a series of plants for study. The product of this effort is a prioritized listing of AFW failures which have occurred at the plant and at other PWRs. This listing is intended for use by NRC inspectors in the preparation of inspection plans addressing AFW risk-important components at the H. B. Robinson plant.

Moffitt, N.E.; Lloyd, R.C.; Gore, B.F.; Vo, T.V. [Pacific Northwest Lab., Richland, WA (United States); Garner, L.W. [Nuclear Regulatory Commission, Washington, DC (United States)

1993-08-01T23:59:59.000Z

111

Auxiliary feedwater system risk-based inspection guide for the McGuire nuclear power plant  

SciTech Connect

In a study sponsored by the US Nuclear Regulatory Commission (NRC), Pacific Northwest Laboratory has developed and applied a methodology for deriving plant-specific risk-based inspection guidance for the auxiliary feedwater (AFW) system at pressurized water reactors that have not undergone probabilistic risk assessment (PRA). This methodology uses existing PRA results and plant operating experience information. Existing PRA-based inspection guidance information recently developed for the NRC for various plants was used to identify generic component failure modes. This information was then combined with plant-specific and industry-wide component information and failure data to identify failure modes and failure mechanisms for the AFW system at the selected plants. McGuire was selected as one of a series of plants for study. The product of this effort is a prioritized listing of AFW failures which have occurred at the plant and at other PWRs. This listing is intended for use by NRC inspectors in the preparation of inspection plans addressing AFW risk-important components at the McGuire plant.

Bumgardner, J.D.; Lloyd, R.C.; Moffitt, N.E.; Gore, B.F.; Vo, T.V. [Pacific Northwest Lab., Richland, WA (United States)

1994-05-01T23:59:59.000Z

112

Auxiliary feedwater system risk-based inspection guide for the South Texas Project nuclear power plant  

SciTech Connect

In a study sponsored by the US Nuclear Regulatory Commission (NRC), Pacific Northwest Laboratory has developed and applied a methodology for deriving plant-specific risk-based inspection guidance for the auxiliary feedwater (AFW) system at pressurized water reactors that have not undergone probabilistic risk assessment (PRA). This methodology uses existing PRA results and plant operating experience information. Existing PRA-based inspection guidance information recently developed for the NRC for various plants was used to identify generic component failure modes. This information was then combined with plant-specific and industry-wide component information and failure data to identify failure modes and failure mechanisms for the AFW system at the selected plants. South Texas Project was selected as a plant for study. The product of this effort is a prioritized listing of AFW failures which have occurred at the plant and at other PWRs. This listing is intended for use by the NRC inspectors in preparation of inspection plans addressing AFW risk important components at the South Texas Project plant.

Bumgardner, J.D.; Nickolaus, J.R.; Moffitt, N.E.; Gore, B.F.; Vo, T.V. [Pacific Northwest Lab., Richland, WA (United States)

1993-12-01T23:59:59.000Z

113

How to accelerate the Fernald remediation  

SciTech Connect

The Fernald Environmental Management Project is unique among Department of Energy (DOE) sites by virtue of successful efforts by the Fernald Environmental Restoration Management Corporation (FERMCO) and DOE-Fernald Area Office (FN) in securing a stak-eholder-assisted final site closure vision and all Record of Decisions (ROD) or Interim RODs required to set the stage for final remediation. DOE and FERMCO have agreed in principle on a Ten Year Plan which accelerates all activities to remediate the site in approximately half the target schedule. This paper presents the path that led to the current Ten Year Plan, the key elements of the plan and the implementation strategies.

Yates, M.K. [Fernald Environmental Restoration Management Corp., Cincinnati, OH (United States). Fernald Environmental Management Project; Reising, J. [USDOE Cincinnati, OH (United States)

1996-01-10T23:59:59.000Z

114

Limiting factors in ground water remediation  

Science Journals Connector (OSTI)

If one is charged with restoring a contaminated aquifer today, the procedure of pumping contaminated water to the surface for treatment and discharge is most often the state-of-practice technology. The perceived success of pump-and-treat technology can be misleading if the hydrology and contaminant characteristics at the site are not adequately understood. A failure to understand the processes controlling contaminant transport can result in extremely long pumping periods and, consequently, costly and inefficient remediation. Effects of tailing, sorption, and residual immiscible fluids on time required for pump-and-treat remediation of ground water are discussed.

Clinton W. Hall; Jeffrey A. Johnson

1992-01-01T23:59:59.000Z

115

Nonaqueous-Phase Liquid Characterization and Post-Remediation Verification  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nonaqueous-Phase Liquid Characterization and Post-Remediation Nonaqueous-Phase Liquid Characterization and Post-Remediation Verification Sampling Nonaqueous-Phase Liquid Characterization and Post-Remediation Verification Sampling Proceedings of the Fourth International Conference on Remediation of Chlorinated and Recalcitrant Compounds. May 2004, Monterey, California. Charles Tabor, Randall Juhlin, Paul Darr, Julian Caballero, Joseph Daniel, David Ingle Nonaqueous-Phase Liquid Characterization and Post-Remediation Verification Sampling More Documents & Publications Steam and ET-DSP Combined for DNAPL Remediation: Full-Scale Site Restoration at Young - Rainey STAR Center Project Overview: Successful Field-Scale In Situ Thermal NAPL Remediation Successful Field-Scale In Situ Thermal NAPL Remediation at the Young - Rainey STAR Center

116

Nonaqueous-Phase Liquid Characterization and Post-Remediation Verification  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nonaqueous-Phase Liquid Characterization and Post-Remediation Nonaqueous-Phase Liquid Characterization and Post-Remediation Verification Sampling Nonaqueous-Phase Liquid Characterization and Post-Remediation Verification Sampling Proceedings of the Fourth International Conference on Remediation of Chlorinated and Recalcitrant Compounds. May 2004, Monterey, California. Charles Tabor, Randall Juhlin, Paul Darr, Julian Caballero, Joseph Daniel, David Ingle Nonaqueous-Phase Liquid Characterization and Post-Remediation Verification Sampling More Documents & Publications Project Overview: Successful Field-Scale In Situ Thermal NAPL Remediation Successful Field-Scale In Situ Thermal NAPL Remediation at the Young - Rainey STAR Center Steam and ET-DSP Combined for DNAPL Remediation: Full-Scale Site Restoration at Young - Rainey STAR Center

117

Mitigation and Remediation of Mercury Contamination at the Y...  

Office of Environmental Management (EM)

Mitigation and Remediation of Mercury Contamination at the Y-12 Plant Oak Ridge Mitigation and Remediation of Mercury Contamination at the Y-12 Plant Oak Ridge Full Document and...

118

Hydrocarbon pollution control and remediation of groundwater: a brief review  

Science Journals Connector (OSTI)

...oil-contaminated sediments. There are two main remediation techniques: soil washing and bio- remediation. With soil washing, contaminated soil is leached with water containing a surfactant to assist in hydrocarbon removal. In situ washing is undertaken...

L. Clark

119

Remedial Costs for MTBE in Soil and Ground Water  

Science Journals Connector (OSTI)

The contamination of MTBE in ground water has introduced concerns about the increased cost of remediating MTBE/BTEX releases compared to remediating sites with BTEX only contamination. In an attempt to evaluat...

Barbara H. Wilson; John T. Wilson Ph.D.

2003-01-01T23:59:59.000Z

120

Draft Final Remedial Investigation/Feasibility Study and Proposed Plan  

E-Print Network (OSTI)

Draft Final Remedial Investigation/Feasibility Study and Proposed Plan Colorado School of Mines, Colorado 80021 #12;The S.M. Stoller Corporation Flood Plain Remedial Investigation / Feasibility Study ..................................................................................................... 1-8 1.6 Previous Investigations

Note: This page contains sample records for the topic "risk-based preliminary remediation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Leg 192 Preliminary Report72 Leg 192 Preliminary Report  

E-Print Network (OSTI)

Leg 192 Preliminary Report72 Figure 21 cm 70 75 80 65 60 #12;Leg 192 Preliminary Report Figure 22 73 Basalt C D E F A B #12;Leg 192 Preliminary Report74 Figure 23 #12;Leg192PreliminaryReport Figure207002120021300 21100 21000 20900 20800 Shotpoints #12;Leg192PreliminaryReport76 Figure 25 Nannofossils

122

Validated analytical data summary report for White Oak Creek Watershed remedial investigation supplemental sampling, Oak Ridge National Laboratory, Oak Ridge, Tennessee  

SciTech Connect

CDM Federal Programs Corporation (CDM Federal) was tasked by the Environmental Restoration Program of Lockheed Martin Energy Systems Inc. (Energy Systems), to collect supplemental surface soil data for the remedial investigation/feasibility study (RI/FS) for the White Oak Creek (WOC) watershed. The WOC watershed RI/FS is being conducted to define a remediation approach for complying with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) at Oak Ridge National Laboratory (ORNL). The data generated from these supplemental sampling activities will be incorporated into the RUFS to aid decision makers and stakeholders with the selection of remedial alternatives and establish remediation goals for the WOC watershed. A series of Data Quality Objective (DQO) meetings were held in February 1996 to determine data needs for the WOC watershed RI/FS. The meetings were attended by representatives from the Tennessee Department of Environment and Conservation, the U.S. Environmental Protection Agency (EPA), the U.S. Department of Energy (DOE), and contractors to DOE. During the DQO meetings, it was determined that the human health risk associated with exposure to radionuclides was high enough to establish a baseline for action; however, it was also determined that the impacts associated with other analytes (mainly metals) were insufficient for determining the baseline ecological risk. Based on this premise, it was determined that additional sampling would be required at four of the Waste Area Groupings (WAGs) included in the WOC watershed to fulfill this data gap.

NONE

1996-09-01T23:59:59.000Z

123

Example of a Risk-Based Disposal Approval: Solidification of Hanford Site Transuranic Waste  

SciTech Connect

The Hanford Site requested, and the U.S. Environmental Protection Agency (EPA) Region 10 approved, a Toxic Substances Control Act of 1976 (TSCA) risk-based disposal approval (RBDA) for solidifying approximately four cubic meters of waste from a specific area of one of the K East Basin: the North Loadout Pit (NLOP). The NLOP waste is a highly radioactive sludge that contained polychlorinated biphenyls (PCBs) regulated under TSCA. The prescribed disposal method for liquid PCB waste under TSCA regulations is either thermal treatment or decontamination. Due to the radioactive nature of the waste, however, neither thermal treatment nor decontamination was a viable option. As a result, the proposed treatment consisted of solidifying the material to comply with waste acceptance criteria at the Waste Isolation Pilot Plant (WIPP) in Carlsbad, New Mexico, or possibly the Environmental Restoration Disposal Facility at the Hanford Site, depending on the resulting transuranic (TRU) content of the stabilized waste. The RBDA evaluated environmental risks associated with potential airborne PCBs. In addition, the RBDA made use of waste management controls already in place at the treatment unit. The treatment unit, the T Plant Complex, is a Resource Conservation and Recovery Act of 1976 (RCRA)-permitted facility used for storing and treating radioactive waste. The EPA found that the proposed activities did not pose an unreasonable risk to human health or the environment. Treatment took place from October 26, 2005 to June 9, 2006, and 332 208-liter (55-gallon) containers of solidified waste were produced. All treated drums assayed to date are TRU and will be disposed at WIPP. (authors)

Barnes, B.M.; Hyatt, J.E.; Martin, P.W.; Prignano, A.L. [Fluor Hanford, Inc., Richland, WA (United States)

2008-07-01T23:59:59.000Z

124

Risk-based site-specific water quality criteria for treated mine-tailings effluent  

SciTech Connect

A mine development project proposes to discharge a combined effluent into marine waters in southeast Alaska. The discharge will consist of sewage, storm water, and tailings pond effluent. With the exception of arsenic, the discharge and its subsequent dispersion will comply with state and federal water quality criteria. The proposed discharge will comply with acute and chronic arsenic standards for the protection of marine life, but will not comply with the arsenic standard for the protection of human health via consumption of seafood. The arsenic standard for the protection of human health is based on a risk management objective that the likelihood of skin cancer be no more than 1 excess case per 100,000 people (10{sup {minus}5}) who ingest arsenic in seafood. Based on USEPA methodology for developing ambient water quality criteria, the seawater concentration that corresponds to this risk management objective is 1.4,{micro}g/L, which is less than the naturally-occurring arsenic concentration in seawater. Consequently, a site-specific risk-based evaluation was conducted to identify more realistic and achievable goals for arsenic in seawater that are consistent with the risk management objective of 10{sup {minus}5}. Parameters evaluated were discharge transport, chemical speciation and fate of arsenic, fish exposure, bioaccumulation and metabolism, patterns of fish catch and consumption, and toxic potency of arsenic. Results of the evaluation showed numerous, substantial differences between the assumptions inherent in the risk assessment model used by USEPA to estimate water quality criteria, and site-specific values that could be applied to the proposed discharge. Overall, the collective weight of evidence indicates that the concentration of arsenic in seawater that corresponds to the 10{sup {minus}5} risk management objective may be substantially (i.e., 10 to 1,000 times) higher than the 1.4 {micro}g/L criterion.

Williams, L.G.; Fendick, E.; LaKind, J.; Stern, B.; Strand, J.A.; Tardiff, R.G. [EA Engineering, Science, and Technology, Redmond, WA (United States)

1995-12-31T23:59:59.000Z

125

ESCO PRELIMINARY ASSESSMENT TEMPLATE  

Energy.gov (U.S. Department of Energy (DOE))

Document presents a template and example to help energy service companies (ESCOs) conduct preliminary assessments required for Federal energy savings performance contract (ESPC) projects.

126

Acoustically enhanced remediation, Phase 2: Technology scaling  

SciTech Connect

Weiss Associates is conducting the following three phase program investigating the in-situ application of acoustically enhanced remediation (AER) of contaminated unconsolidated soil and ground water under both saturated and unsaturated conditions: Phase I-- laboratory scale parametric investigation; Phase II--technology Scaling; and Phase III--large scale field tests. AER addresses the need for NAPL (either lighter or denser than water: LNAPL or DNAPL, respectively) in high and low permeability sediments, and the remediation of other types of subsurface contaminants (e.g., metals, radionuclides) in low permeability soils. This program has been placed in the U.S. Department of Energy`s (DOE`s) DNAPL product. Phase I indicated that AER could be used to effectively remediate NAPL in high permeability soil, and that removal of NAPL from low permeability soil could be increased since the water flux through these soils was significantly increased. Phase II, Technology Scaling, the subject of this paper, focused on (1) evaluating the characteristics of an AER field deployment system, (2) developing DNAPL flow and transport performance data under acoustic excitation, (3) predicting the effect of acoustic remediation in three-dimensional unconsolidated hydrogeologic conditions, (4) conducting an engineering analysis of acoustical sources, and (5) identifying candidate field site(s) for large-scale field testing of the technology.

Iovenitti, J.L.; Hill, D.G. [Weiss Associates, Emeryville, CA (United States); Rynne, T.M.; Spadaro, J.F.; Hutchinson, W. [Scientific Applications and Research Associates, Inc., Huntington Beach, CA (United States); Illangasakere, T. [Colorado Univ., Boulder, CO (United States). Dept. of Civil, Environmental, and Architectural Engineering

1996-12-31T23:59:59.000Z

127

groundwater nitrogen source identification and remediation  

E-Print Network (OSTI)

producer profits. This will, in turn, benefit water bodies in the area that receive stream baseflow fromgroundwater nitrogen source identification and remediation The Seymour Aquifer is a shallow aquifer water withdraws are used for irrigation while the cities of Vernon, Burk- burnett and Electra and many

128

Gamma Ray Imaging for Environmental Remediation  

SciTech Connect

This program is the development of germanium strip detectors for environmental remediation. It is a collaboration between the Naval Research Laboratory and Lawrence Berkeley National Lab. The goal is to develop detectors that are simultaneously capable of excellent spectroscopy and imaging of gamma radiation.

B.F. Philips; R.A. Kroeger: J.D. Kurfess: W.N. Johnson; E.A. Wulf; E. I. Novikova

2004-11-12T23:59:59.000Z

129

Targeted Health Assessment for Wastes Contained at the Niagara Falls Storage Site to Guide Planning for Remedial Action Alternatives - 13428  

SciTech Connect

The U.S. Army Corps of Engineers (USACE) is evaluating potential remedial alternatives at the 191-acre Niagara Falls Storage Site (NFSS) in Lewiston, New York, under the Formerly Utilized Sites Remedial Action Program (FUSRAP). The Manhattan Engineer District (MED) and Atomic Energy Commission (AEC) brought radioactive wastes to the site during the 1940's and 1950's, and the U.S. Department of Energy (US DOE) consolidated these wastes into a 10-acre interim waste containment structure (IWCS) in the southwest portion of the site during the 1980's. The USACE is evaluating remedial alternatives for radioactive waste contained within the IWCS at the NFSS under the Feasibility Study phase of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process. A preliminary evaluation of the IWCS has been conducted to assess potential airborne releases associated with uncovered wastes, particularly during waste excavation, as well as direct exposures to uncovered wastes. Key technical issues for this assessment include: (1) limitations in waste characterization data; (2) representative receptors and exposure routes; (3) estimates of contaminant emissions at an early stage of the evaluation process; (4) consideration of candidate meteorological data and air dispersion modeling approaches; and (5) estimates of health effects from potential exposures to both radionuclides and chemicals that account for recent updates of exposure and toxicity factors. Results of this preliminary health risk assessment indicate if the wastes were uncovered and someone stayed at the IWCS for a number of days to weeks, substantial doses and serious health effects could be incurred. Current controls prevent such exposures, and the controls that would be applied to protect onsite workers during remedial action at the IWCS would also effectively protect the public nearby. This evaluation provides framing context for the upcoming development and detailed evaluation of remedial alternatives for the IWCS. (authors)

Busse, John; Keil, Karen; Staten, Jane; Miller, Neil; Barker, Michelle [U.S. Army Corps of Engineers, Buffalo District, 1776 Niagara Street, Buffalo, NY (United States)] [U.S. Army Corps of Engineers, Buffalo District, 1776 Niagara Street, Buffalo, NY (United States); MacDonell, Margaret; Peterson, John; Chang, Young-Soo; Durham, Lisa [Argonne National Laboratory, Environmental Science Division, 9700 S. Cass Ave., Argonne, IL 60439 (United States)] [Argonne National Laboratory, Environmental Science Division, 9700 S. Cass Ave., Argonne, IL 60439 (United States)

2013-07-01T23:59:59.000Z

130

PRELIMINARY NOTICE OF VIOLATION, January 4, 2002  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 4, 2002 January 4, 2002 Mr. Woodrow Jameson President Fluor Fernald, Inc. P.O. Box 538704 Cincinnati, OH 45253-8704 EA-2001-06 Subject: Preliminary Notice of Violation and Proposed Imposition of Civil Penalty ($55,000) Dear Mr. Jameson: This letter refers to the Department of Energy's (DOE) evaluation of several problems and events occurring during calendar years 2000 and 2001 in association with the Waste Pits Remedial Action Project (WPRAP). In August 2000 your staff identified a problem with elevated airborne radioactivity levels at the WPRAP T321 trailer. This long-standing deficiency resulted in a significant number of workers receiving unplanned and unmonitored radiation exposures. DOE also evaluated deficiencies related to WPRAP operator training and qualification,

131

Observational Approach to Chromium Site Remediation - 13266  

SciTech Connect

Production reactors at the U.S. Department of Energy's (DOE) Hanford Site in Richland, Washington, required massive quantities of water for reactor cooling and material processing. To reduce corrosion and the build-up of scale in pipelines and cooling systems, sodium dichromate was added to the water feedstock. Spills and other releases at the makeup facilities, as well as leaks from miles of pipelines, have led to numerous areas with chromium-contaminated soil and groundwater, threatening fish populations in the nearby Columbia River. Pump-and-treat systems have been installed to remove chromium from the groundwater, but significant contamination remain in the soil column and poses a continuing threat to groundwater and the Columbia River. Washington Closure Hanford, DOE, and regulators are working on a team approach that implements the observational approach, a strategy for effectively dealing with the uncertainties inherent in subsurface conditions. Remediation of large, complex waste sites at a federal facility is a daunting effort. It is particularly difficult to perform the work in an environment of rapid response to changing field and contamination conditions. The observational approach, developed by geotechnical engineers to accommodate the inherent uncertainties in subsurface conditions, is a powerful and appropriate method for site remediation. It offers a structured means of quickly moving into full remediation and responding to the variations and changing conditions inherent in waste site cleanups. A number of significant factors, however, complicate the application of the observational approach for chromium site remediation. Conceptual models of contamination and site conditions are difficult to establish and get consensus on. Mid-stream revisions to the design of large excavations are time-consuming and costly. And regulatory constraints and contract performance incentives can be impediments to the flexible responses required under the observational approach. The WCH project team is working closely with stakeholders and taking a number of steps to meet these challenges in a continuing effort to remediate chromium contaminated soil in an efficient and cost-effective manner. (authors)

Scott Myers, R. [Washington Closure Hanford, 2620 Fermi, Richland, Washington 99354 (United States)] [Washington Closure Hanford, 2620 Fermi, Richland, Washington 99354 (United States)

2013-07-01T23:59:59.000Z

132

Preliminary Flood Plain Characterization Appendix A  

E-Print Network (OSTI)

Appendix A Preliminary Flood Plain Characterization #12;Appendix A Preliminary Flood Plain ................................................................................................................................. 1 1.1 Flood Plain Preliminary Characterization Objectives.......................................................................1 2 Flood Plain Preliminary Characterization Activities

133

Risk based corrective action: An application to closure of a fuel oil bunker site  

SciTech Connect

An evaluation of the potential risk of adversely impacting the site ground water was conducted at a food processing facility in California. The facility stored fuel oil in a 50,000-gallon concrete bunker in addition to gasoline and kerosene tanks onsite. In response to an environmental impact assessment, a site remediation plan was implemented which consisted of removal of the concrete bunker and majority of the impacted soils to a depth of about 45 ft (13.72 m) below ground surface (bgs). Some of the soil samples collected at depths between 45 and 50 ft (13.72 and 15.24 m) indicated TPH levels as high as 5,275 mg/kg. A risk evaluation was conducted for a worst case scenario to document the fate and transport of the residual compounds reaching the shallow ground water flow system. It was demonstrated that the residual fuel oil present in the overlying soil did not impact the ground water at the time of investigation, and is not likely to have adverse impact on the shallow ground water beneath the site. Therefore, no further corrective action was needed and the site was closed.

Panigrahi, B.K.; Acharya, B.P.

1999-07-01T23:59:59.000Z

134

Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase III  

SciTech Connect

The remedial design/remedial action for Operable Unit 6-05 (Waste Area Group 6) and Operable Unit 10-04 (Waste Area Group 10) - collectively called Operable Unit 10-04 has been divided into four phases. Phase I consists of developing and implementing institutional controls at Operable Unit 10-04 sites and developing and implementing Idaho National Laboratory-wide plans for both institutional controls and ecological monitoring. Phase II will remediate sites contaminated with trinitrotoluene and Royal Demolition Explosive. Phase III will remediate lead contamination at a gun range, and Phase IV will remediate hazards from unexploded ordnance. This Phase III remedial Design/Remedial Action Work Plan addresses the remediation of lead-contaminated soils found at the Security Training Facility (STF)-02 Gun Range located at the Idaho National Laboratory. Remediation of the STF-02 Gun Range will include excavating contaminated soils; physically separating copper and lead for recycling; returning separated soils below the remediation goal to the site; stabilizing contaminated soils, as required, and disposing of the separated soils that exceed the remediation goal; encapsulating and disposing of creosote-contaminated railroad ties and power poles; removing and disposing of the wooden building and asphalt pads found at the STF-02 Gun Range; sampling and analyzing soil to determine the excavation requirements; and when the remediation goals have been met, backfilling and contouring excavated areas and revegetating the affected area.

R. P. Wells

2006-09-19T23:59:59.000Z

135

Development and application of proposed ASME Section XI Code changes for risk-based inspection of piping  

SciTech Connect

This synopsis has been written to describe a perspective on the development and application of ASME Section XI Code changes for risk-based inspection of piping. The content is specifically related to the use of risk-based technology for Inservice Inspection (ISI) of piping and efforts made to support the ASME Research/Westinghouse Owners Group/Millstone Unit 3 approach for use of this technology. The opinions contained herein may or may not reflect those of the ASME Codes and Standards Committees responsible for these activities. In order to take such a detailed technical subject and put it into an understandable format, the author has chosen to provide an analogy to simplify what is actually taking place. Risk-based technology in the ISI of piping can be likened to the process of making and using specifically ground prescription glasses to allow for better vision. It provides a process to develop and use these uniquely ground glasses that will dynamically focus on all the locations and obstacles within a plant`s piping systems that could cause that plant to trip and fall; more importantly it identifies the locations where the fall could possibly hurt someone else. In this way, Nuclear Safety is being addressed.

West, R.A. [Northeast Utilities Millstone Nuclear Power Station-USA, Hartford, CT (United States)

1996-12-01T23:59:59.000Z

136

WASTE PACKAGE REMEDIATION SYSTEM DESCRIPTION DOCUMENT  

SciTech Connect

The Waste Package Remediation System remediates waste packages (WPs) and disposal containers (DCs) in one of two ways: preparation of rejected DC closure welds for repair or opening of the DC/WP. DCs are brought to the Waste Package Remediation System for preparation of rejected closure welds if testing of the closure weld by the Disposal Container Handling System indicates an unacceptable, but repairable, welding flaw. DC preparation of rejected closure welds will require removal of the weld in such a way that the Disposal Container Handling System may resume and complete the closure welding process. DCs/WPs are brought to the Waste Package Remediation System for opening if the Disposal Container Handling System testing of the DC closure weld indicates an unrepairable welding flaw, or if a WP is recovered from the subsurface repository because suspected damage to the WP or failure of the WP has occurred. DC/WP opening will require cutting of the DC/WP such that a temporary seal may be installed and the waste inside the DC/WP removed by another system. The system operates in a Waste Package Remediation System hot cell located in the Waste Handling Building that has direct access to the Disposal Container Handling System. One DC/WP at a time can be handled in the hot cell. The DC/WP arrives on a transfer cart, is positioned within the cell for system operations, and exits the cell without being removed from the cart. The system includes a wide variety of remotely operated components including a manipulator with hoist and/or jib crane, viewing systems, machine tools for opening WPs, and equipment used to perform pressure and gas composition sampling. Remotely operated equipment is designed to facilitate DC/WP decontamination and hot cell equipment maintenance, and interchangeable components are provided where appropriate. The Waste Package Remediation System interfaces with the Disposal Container Handling System for the receipt and transport of WPs and DCs. The Waste Handling Building System houses the system, and provides the facility, safety, and auxiliary systems required to support operations. The system receives power from the Waste Handling Building Electrical System. The system also interfaces with the various DC systems.

N.D. Sudan

2000-06-22T23:59:59.000Z

137

Waste Feed Delivery System Phase 1 Preliminary Reliability and Availability and Maintainability Analysis [SEC 1 and 2  

SciTech Connect

The document presents updated results of the preliminary reliability, availability, maintainability analysis performed for delivery of waste feed from tanks 241-AZ-101 and 241-AN-105 to British Nuclear Fuels Limited, inc. under the Tank Waste Remediation System Privatization Contract. The operational schedule delay risk is estimated and contributing factors are discussed.

CARLSON, A.B.

1999-11-11T23:59:59.000Z

138

Rethinking remediation technologies for desertified landscapes  

SciTech Connect

Shrub-dominated communities have replaced native grasslands throughout much of the arid Southwest during the past 120 years. Most currently available remediation technologies are uneconomical due to large inputs of energy, fertilizers, herbicides and labor, or are ecologically ineffective due to harsh environments and the highly competitive nature of these native shrubs. Our analysis of these historical remediation technologies together with new information on ecosystem processes has led us to pursue an ecologically-based approach in which more limited inputs are targeted to promote natural processes of regeneration. Advantages to this approach include lower costs, reduced reliance on agronomic practices, and maintenance of natural landscape features. Disadvantages include longer time required for desired changes to occur, and a need for increased understanding of arid land processes.

Herrick, J.E.; Havstad, K.M. [New Mexico State Univ., Las Cruces, NM (United States); Coffin, D.P. [Colorado State Univ., Fort Collins, CO (United States)

1997-07-01T23:59:59.000Z

139

The role of innovative remediation technologies  

SciTech Connect

There are currently over 1200 sites on the US Superfund's National Priorities List (NPL) of hazardous waste sites, and there are over 30, 000 sites listed by the Comprehensive Environmental Responsibility, Compensation and Liability Information System (CERCLIS). The traditional approach to remediating sites in the US has been to remove the material and place it in a secure landfill, or in the case of groundwater, pump and treat the effluent. These technologies have proven to be very expensive and don't really fix the problem. The waste is just moved from one place to another. In recent years, however, alternative and innovative technologies have been increasingly used in the US to replace the traditional approaches. This paper will focus on just such innovative remediation technologies in the US, looking at the regulatory drivers, the emerging technologies, some of the problems in deploying technologies, and a case study.

Doesburg, J.M.

1992-05-01T23:59:59.000Z

140

The role of innovative remediation technologies  

SciTech Connect

There are currently over 1200 sites on the US Superfund`s National Priorities List (NPL) of hazardous waste sites, and there are over 30, 000 sites listed by the Comprehensive Environmental Responsibility, Compensation and Liability Information System (CERCLIS). The traditional approach to remediating sites in the US has been to remove the material and place it in a secure landfill, or in the case of groundwater, pump and treat the effluent. These technologies have proven to be very expensive and don`t really fix the problem. The waste is just moved from one place to another. In recent years, however, alternative and innovative technologies have been increasingly used in the US to replace the traditional approaches. This paper will focus on just such innovative remediation technologies in the US, looking at the regulatory drivers, the emerging technologies, some of the problems in deploying technologies, and a case study.

Doesburg, J.M.

1992-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "risk-based preliminary remediation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

2010sr31_box-remediation.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

Thursday, November 18, 2010 Thursday, November 18, 2010 james-r.giusti@srs.gov Paivi Nettamo, SRNS, (803) 292-2484 paivi.nettamo@srs.gov SRS Recovery Act TRU Waste Project Ahead of Schedule with Box Remediation Program Aiken, SC - The U.S. Department of Energy's Savannah River Site (SRS) started off the last 12 months of the American Recovery and Reinvestment Act with an enormous success in its legacy transuranic (TRU) waste program. The H-Canyon

142

Remediation and Recycling of Linde FUSRAP Materials  

SciTech Connect

During World War II, the Manhattan Engineering District (MED) utilized facilities in the Buffalo, New York area to extract natural uranium from uranium-bearing ores. The Linde property is one of several properties within the Tonawanda, New York Formerly Utilized Sites Remedial Action Program (FUSRAP) site, which includes Linde, Ashland 1, Ashland 2, and Seaway. Union Carbide Corporation's Linde Division was placed under contract with the Manhattan Engineering District (MED) from 1942 to 1946 to extract uranium from seven different ore sources: four African pitchblende ores and three domestic ores. Over the years, erosion and weathering have spread contamination from the residuals handled and disposed of at Linde to adjacent soils. The U.S. Department of Energy (DOE) and the U.S. Environmental Protection Agency (EPA) negotiated a Federal Facilities Agreement (FFA) governing remediation of the Linde property. In Fiscal Year (FY) 1998, Congress transferred cleanup management responsibility for the sites in the FUSRAP program, including the Linde Site, from the DOE to the U.S. Army Corps of Engineers (USACE), with the charge to commence cleanup promptly. All actions by the USACE at the Linde Site are being conducted subject to the administrative, procedural, and regulatory provisions of the Comprehensive Environmental Response Compensation and Liability Act (CERCLA) and the existing FFA. USACE issued a Proposed Plan for the Linde Property in 1999 and a Final Record of Decision (ROD) in 2000. USACE worked with the local community near the Tonawanda site, and after considering public comment, selected the remedy calling for removing soils that exceed the site-specific cleanup standard, and transporting the contaminated material to off-site locations. The selected remedy is protective of human health and the environment, complies with Federal and State requirements, and meets commitments to the community.

Coutts, P. W.; Franz, J. P.; Rehmann, M. R.

2002-02-27T23:59:59.000Z

143

Thixotropic gel for vadose zone remediation  

DOE Patents (OSTI)

A thixotropic gel suitable for use in subsurface bioremediation is provided along with a process of using the gel. The thixotropic gel provides a non-migrating injectable substrate that can provide below ground barrier properties. In addition, the gel components provide for a favorable environment in which certain contaminants are preferentially sequestered in the gel and subsequently remediated by either indigenous or introduced microorganisms.

Rhia, Brian D. (Augusta, GA)

2011-03-01T23:59:59.000Z

144

Innovative mathematical modeling in environmental remediation  

Science Journals Connector (OSTI)

There are two different ways to model reactive transport: ad hoc and innovative reaction-based approaches. The former, such as the Kd simplification of adsorption, has been widely employed by practitioners, while the latter has been mainly used in scientific communities for elucidating mechanisms of biogeochemical transport processes. It is believed that innovative mechanistic-based models could serve as protocols for environmental remediation as well. This paper reviews the development of a mechanistically coupled fluid flow, thermal transport, hydrologic transport, and reactive biogeochemical model and example-applications to environmental remediation problems. Theoretical bases are sufficiently described. Four example problems previously carried out are used to demonstrate how numerical experimentation can be used to evaluate the feasibility of different remediation approaches. The first one involved the application of a 56-species uranium tailing problem to the Melton Branch Subwatershed at Oak Ridge National Laboratory (ORNL) using the parallel version of the model. Simulations were made to demonstrate the potential mobilization of uranium and other chelating agents in the proposed waste disposal site. The second problem simulated laboratory-scale system to investigate the role of natural attenuation in potential off-site migration of uranium from uranium mill tailings after restoration. It showed inadequacy of using a single Kd even for a homogeneous medium. The third example simulated laboratory experiments involving extremely high concentrations of uranium, technetium, aluminum, nitrate, and toxic metals (e.g., Ni, Cr, Co). The fourth example modeled microbially-mediated immobilization of uranium in an unconfined aquifer using acetate amendment in a field-scale experiment. The purposes of these modeling studies were to simulate various mechanisms of mobilization and immobilization of radioactive wastes and to illustrate how to apply reactive transport models for environmental remediation.

Gour-Tsyh Yeh; Jin-Ping Gwo; Malcolm D. Siegel; Ming-Hsu Li; Yilin Fang; Fan Zhang; Wensui Luo; Steve B. Yabusaki

2013-01-01T23:59:59.000Z

145

Remedial design through effective electronic associations  

SciTech Connect

Black and Veatch Special Projects Corp. (BVSPC) used an environmental data management system (EDMS) to consolidate x-ray fluorescence (XRF), global positioning system (GPS), and laboratory analytical data into a unique and flexible electronic database. Cost savings were acknowledged in all phases of the remedial design due to the development and use of the EDMS and its distinct associations with various electronic software packages. The EDMS allowed effective and efficient completion of the remedial design investigation of the Oronogo-Duenweg Mining Belt Site. The Site is a 125-year old mining community in Jasper County, Missouri. Approximately 6,500 residences are now located within the 60 square-mile Superfund Site where lead and zinc were mined. Smelting and mining activities were conducted in several areas throughout the community. These operations left approximately 9 million tons of mine wastes at the Site upon completion of the mining activities. The purpose of the remedial design investigation was to quantify and identify the residential yards that were adversely affected by these activities.

Deis, J.L.; Wankum, R.D.

1999-07-01T23:59:59.000Z

146

PRELIMINARY SURVEY OF WINCHESTER ENGINEERING AND ANALYTICAL CENTER  

Office of Legacy Management (LM)

WINCHESTER ENGINEERING AND ANALYTICAL CENTER WINCHESTER ENGINEERING AND ANALYTICAL CENTER Winchester, Massachusetts Work performed by the Health and Safety Research Division Oak Ridge National Laboratory Oak Ridge, Tennessee 37830 March 1980 . .- _ 2. / f OAK RIDGE NATIONAL LABORATORY operated by UNION CARBIDE CORPOdATIOt'i for the DEPARTMENT OF ENERGY as part of the Formerly Utilized Sites-- Remedial Action PL;ogram .-__ - - .--..--_ ~. _.. -. THE FORMER WINCHESTER ENGINEERING AND ANALYTICAL CENTER Winchester, Massachusetts At the request of the Department of Energy (DOE, then ERDA), a preliminary survey was performed at the former Winchester Engineering and Analytical Center, Winchester, Massachusetts (see Fig. 1), on January 25, 1977, to assess the radiological status of this facility

147

Workbook for prioritizing petroleum industry exploration and production sites for remediation  

SciTech Connect

The purpose of this Workbook is to provide a screening-level method for prioritizing petroleum exploration and production sites for remediation that is based on readily available information, but which does not require a full characterization of the sites being evaluated. The process draws heavily from the Canadian National Classification System for Contaminated Sites, and fits into the framework for ecological risk assessment provided in guidance from the US Environmental Protection Agency. Using this approach, scoring guidelines are provided for a number of Evaluation Factors relating to: (1) the contaminants present at the site; (2) the potential exposure pathways for these contaminants; and (3) the potential receptors of those contaminants. The process therefore incorporates a risk-based corrective action (RBCA) framework to estimate the relative threat posed by a site to human health and to ecological systems. Physical (non-toxic) disturbance factors have also been incorporated into the process. It should also be noted that the process described in this Workbook has not yet been field tested at petroleum E and P sites. The first logical step in the field testing of this process is to apply the method at a small number of sites to assess the availability of the information that is needed to score each evaluation factor. Following this evaluation, the Workbook process should be applied at a series of sites to determine the effectiveness of the process at ranking sites according to their relative need for remediation. Upon completion of these tests, the Workbook should be revised to reflect the findings of the field tests.

White, G.J.

1998-08-03T23:59:59.000Z

148

California Energy Commission PRELIMINARY  

E-Print Network (OSTI)

California Energy Commission PRELIMINARY STATE ENERGY PROGRAM GUIDELINES JULY 16, 2009 CEC-150 Recovery and Reinvestment Act State Energy Program Guidelines 5 A. Background ....................................................................................................................... 12 R. Reallocation of Funds

149

Preliminary Drill Sites  

SciTech Connect

Preliminary locations for intermediate depth temperature gradient holes and/or resource confirmation wells based on compilation of geological, geophysical and geochemical data prior to carrying out the DOE-funded reflection seismic survey.

Lane, Michael

2013-06-28T23:59:59.000Z

150

Preliminary Drill Sites  

DOE Data Explorer (OSTI)

Preliminary locations for intermediate depth temperature gradient holes and/or resource confirmation wells based on compilation of geological, geophysical and geochemical data prior to carrying out the DOE-funded reflection seismic survey.

Lane, Michael

151

Evaluation of Final Radiological Conditions at Areas of the Niagara Falls Storage Site Remediated under the Formerly Utilized Sites Remedial Action Program  

Energy.gov (U.S. Department of Energy (DOE))

Evaluation of Final Radiological Conditions at Areas of the Niagara Falls Storage Site Remediated under the Formerly Utilized Sites Remedial Action Program (March 2012)

152

Preliminary Notice of Violation , Rocky Flats Environmental Technology Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Violation , Rocky Flats Environmental Violation , Rocky Flats Environmental Technology Site - EA-96-05 Preliminary Notice of Violation , Rocky Flats Environmental Technology Site - EA-96-05 October 7, 1996 Preliminary Notice of Violation issued to Safe Sites of Colorado related to Radiological and Work Control Deficiencies associated with Two Radiological Release Events at the Rocky Flats Environmental Technology Site, (EA-96-05) Based on our evaluation of these matters, DOE has concluded that violations of DOE's Occupational Radiation Protection Rule (10 CFR 835) and Quality Assurance Rule (10 CFR 830.120) likely occurred. An enforcement conference was held with you, as well as senior management of KHLL and Rocky Mountain Remediation Services (RMRS), on September 10, 1996. This conference included a discussion of the facts and circumstances surrounding these

153

Preliminary Notice of Violation,Savannah River Nuclear Solutions, LLC -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Nuclear Solutions, Savannah River Nuclear Solutions, LLC - NEA-2011-02 Preliminary Notice of Violation,Savannah River Nuclear Solutions, LLC - NEA-2011-02 July 22, 2011 Preliminary Notice of Violation issued to Savannah River Nuclear Solutions, LLC related to a Puncture Wound Injury resulting in a Radiological Uptake at the Savannah River Site This letter refers to the Office of Health, Safety and Security's Office of Enforcement and Oversight investigation into the facts and circumstances associated with the June 14, 2010, employee puncture wound injury, which occurred in the F-TRU Remediation Enclosure within the F-Canyon Facility, at the U.S. Department of Energy' s (DOE) Savannah River Site. This occurrence was reported in Noncompliance Tracking System (NTS) report NTS-SRSO--SRNS-CPWM-20IO-0002, Contaminated Puncture Wound During TRU Drum

154

PRELIMINARY SURVEY O F INTERNATIONAL M INERALS AND CHEMICAL CORPORATION  

Office of Legacy Management (LM)

Pk.. = "p' Pk.. = "p' . PRELIMINARY SURVEY O F INTERNATIONAL M INERALS AND CHEMICAL CORPORATION M u lberry, F lorida I Work performed by the Health and Safety Research Division Oak Ridge National Laboratory Oak Ridge, Tennessee 37830 March 1980 OAK.RIDGE NATIONAL LABORATORY operated by UNION CARBIDE CORPORATION for the DEPARTMENT O F ENERGY as part of the Formerly Utilized Sites-- Remedial Action Program .-. _ ._-. .__._ ..-...- -. .,. _... I_-.-.- INTERNATIONAL MINERALS AND CHEMICAL CORPORATION Mulberry, Florida At the request of the Department of Energy (DOE, then ERDA), a preliminary survey was performed at the International Minerals and Chemical Corporation in Mulberry, Florida (see Fig. 1), on April 6, 1977, to assess the radiological status of the facilities utilized under

155

Remediation of Mercury and Industrial Contaminants Applied Field Research  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Remediation of Mercury and Industrial Contaminants Applied Field Remediation of Mercury and Industrial Contaminants Applied Field Research Initiative (RoMIC-AFRI) Remediation of Mercury and Industrial Contaminants Applied Field Research Initiative (RoMIC-AFRI) Remediation of Mercury and Industrial Contaminants Applied Field Research Initiative (RoMIC-AFRI) Located on the Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee, the RoMIC-AFRI was established to protect water resources by addressing the challenge of preventing contamination. The initiative at Oak Ridge is a collaborative effort that leverages DOE investments in basic science and applied research and the work of site contractors to address the complex challenges in the remediation of legacy waste at the Oak Ridge Reservation. The mission of the Remediation of Mercury and Industrial Contaminants

156

Savannah River Remediation Intern Sees Nuclear Industry as Job Opportunity  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Remediation Intern Sees Nuclear Industry as Job Savannah River Remediation Intern Sees Nuclear Industry as Job Opportunity Savannah River Remediation Intern Sees Nuclear Industry as Job Opportunity July 9, 2012 - 10:00am Addthis Spencer Isom, second year engineering intern for Savannah River Remediation (SRR) and fourth summer at Savannah River Site (SRS), performs a standard equipment check at Saltstone Production Facility. | Photo courtesy of Savannah River Site Spencer Isom, second year engineering intern for Savannah River Remediation (SRR) and fourth summer at Savannah River Site (SRS), performs a standard equipment check at Saltstone Production Facility. | Photo courtesy of Savannah River Site Maddie M. Blair Public Affairs Intern, Savannah River Remediation Why does she keep coming back? "There are so many fascinating processes, people, and work

157

Independent Activity Report, CH2M Hill Plateau Remediation Company -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Activity Report, CH2M Hill Plateau Remediation Company Independent Activity Report, CH2M Hill Plateau Remediation Company - January 2011 Independent Activity Report, CH2M Hill Plateau Remediation Company - January 2011 January 2011 Review of the CH2M Hill Plateau Remediation Company Unreviewed Safety Question Procedure [ARPT-RL-2011-003] The U.S. Department of Energy Office of Independent Oversight, within the Office of Health, Safety and Security, during a site visit from January 10-14, 2011, presented the results of a technical review of the CH2M Hill Plateau Remediation Company (PRC) Unreviewed Safety Question (USQ) Procedure. Independent Activity Report, CH2M Hill Plateau Remediation Company - January 2011 More Documents & Publications CX-009415: Categorical Exclusion Determination Independent Activity Report, Richland Operations Office - January 2011

158

Savannah River Remediation Intern Sees Nuclear Industry as Job Opportunity  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Remediation Intern Sees Nuclear Industry as Job Savannah River Remediation Intern Sees Nuclear Industry as Job Opportunity Savannah River Remediation Intern Sees Nuclear Industry as Job Opportunity July 9, 2012 - 10:00am Addthis Spencer Isom, second year engineering intern for Savannah River Remediation (SRR) and fourth summer at Savannah River Site (SRS), performs a standard equipment check at Saltstone Production Facility. | Photo courtesy of Savannah River Site Spencer Isom, second year engineering intern for Savannah River Remediation (SRR) and fourth summer at Savannah River Site (SRS), performs a standard equipment check at Saltstone Production Facility. | Photo courtesy of Savannah River Site Maddie M. Blair Public Affairs Intern, Savannah River Remediation Why does she keep coming back? "There are so many fascinating processes, people, and work

159

Gas: A Neglected Phase in Remediation of Metals and Radionuclides  

SciTech Connect

The gas phase is generally ignored in remediation of metals and radionuclides because it is assumed that there is no efficient way to exploit it. In the literal sense, all remediations involve the gas phase because this phase is linked to the liquid and solid phases by vapor pressure and thermodynamic relationships. Remediation methods that specifically use the gas phase as a central feature have primarily targeted volatile organic contaminants, not metals and radionuclides. Unlike many organic contaminants, the vapor pressure and Henry's Law constants of metals and radionuclides are not generally conducive to direct air stripping of dissolved contaminants. Nevertheless, the gas phase can play an important role in remediation of inorganic contaminants and provide opportunities for efficient, cost effective remediation. The objective here is to explore ways in which manipulation of the gas phase can be used to facilitate remediation of metals and radionuclides.

Denham, Miles E.; Looney, Brian B

2005-09-28T23:59:59.000Z

160

Invited paper in the Proceedings of the United Engineering Foundation Conference on Risk-Based Decision-Making in Water Resources IX, "20-Year Retrospective and Prospective of  

E-Print Network (OSTI)

1 Invited paper in the Proceedings of the United Engineering Foundation Conference on Risk- Based with information from other sources, in the form of a business case [Bowles 2000b] for proceeding with dam safety

Bowles, David S.

Note: This page contains sample records for the topic "risk-based preliminary remediation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Soils Project Risk-Based Corrective Action Evaluation Process with ROTC 1 and ROTC 2, Revision 0  

SciTech Connect

This document formally defines and clarifies the NDEP-approved process the NNSA/NSO Soils Activity uses to fulfill the requirements of the FFACO and state regulations. This process is used to establish FALs in accordance with the risk-based corrective action (RBCA) process stipulated in Chapter 445 of the Nevada Administrative Code (NAC) as described in the ASTM International (ASTM) Method E1739-95 (NAC, 2008; ASTM, 1995). It is designed to provide a set of consistent standards for chemical and radiological corrective actions.

Matthews, Patrick; Sloop, Christina

2012-04-01T23:59:59.000Z

162

Preliminary Notice of Violation, Babcock & Wilcox of Ohio, Inc - EA-98-12 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Ohio, Inc - of Ohio, Inc - EA-98-12 Preliminary Notice of Violation, Babcock & Wilcox of Ohio, Inc - EA-98-12 November 16, 1998 Preliminary Notice of Violation issued to Babcock & Wilcox of Ohio, Inc., related to Radiological Work Controls and Bioassay Program Deficiencies at the Mound Site, (EA-98-12) This letter refers to the Department of Energy's (DOE) investigation of the facts and circumstances concerning a number of significant deficiencies in Babcock & Wilcox of Ohio, Inc., (BWO) radiological work controls and bioassay program at the DOE Mound Site and its corrective actions to remedy those deficiencies. Preliminary Notice of Violation, Babcock & Wilcox of Ohio, Inc - EA-98-12 More Documents & Publications Preliminary Notice of Violation EA 98-12

163

Part 2: Quality Assurance Project Plan Remedial Investigation, UMore East  

E-Print Network (OSTI)

Part 2: Quality Assurance Project Plan Remedial Investigation, UMore East Dakota County, Minnesota\\23191092 UMore 1948 Parcel Remedial Inv\\WorkFiles\\SAP\\Part 2-QAPP Umore East v2.1\\QAPP rev. 2.1.doc A2 Table\\19\\23191092 UMore 1948 Parcel Remedial Inv\\WorkFiles\\SAP\\Part 2-QAPP Umore East v2.1\\QAPP rev. 2

Netoff, Theoden

164

Utah Division of Environmental Response and Remediation Underground...  

Open Energy Info (EERE)

Division of Environmental Response and Remediation Underground Storage Tank Branch Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Utah...

165

Remediation of environmental contaminants by novel organoclay adsorbents.  

E-Print Network (OSTI)

??Naturally occuring layer silicate clay minerals could be value-added by modifying the surface properties in order to enhance their efficacy in the remediation of environmental… (more)

Sarkar, Binoy

2011-01-01T23:59:59.000Z

166

SBA Increases Size Standards for Waste Remediation Services ...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Remediation Services & InformationAdmin Support December 12, 2012 - 10:22am Addthis John Hale III John Hale III Director, Office of Small and Disadvantaged Business Utilization...

167

EPA - National Remedy Review Board webpage | Open Energy Information  

Open Energy Info (EERE)

Review Board webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: EPA - National Remedy Review Board webpage Abstract This webpage provides...

168

Hydrogen Embrittlement of Pipeline Steels: Causes and Remediation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Embrittlement of Pipeline Steels: Causes and Remediation P. Sofronis, I. M. Robertson, D. D. Johnson University of Illinois at Urbana-Champaign Hydrogen Pipeline Working Group...

169

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

DOE has determined that the contamination is not attirbutable to the AEC-sponsored operations. Therefore, DOE does not have legal authority to conduct remedial actions at...

170

100-D/H Remedial Investigation/ Feasibility Study /Proposed...  

NLE Websites -- All DOE Office Websites (Extended Search)

Remedial Investigation Feasibility Study Proposed Plan Nina Menard Washington State Department of Ecology 100-DH RIFSPP * Received Draft RIFSPP on December 14, 2012 *...

171

Hydrogen Embrittlement of Pipeline Steels: Causes and Remediation...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Barriers: Hydrogen embrittlement of pipelines and remediation (mixing with water vapor?) hpwgwembrittlementsteelssofronis.pdf More Documents & Publications Webinar: I2CNER: An...

172

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

DOW CHEMICAL COMPANY WALNUT CREEK, CALIFORNIA Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site...

173

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

RADIOLOGICAL HEALTH LABORATORY) WINCHESTER, MASSACHUSE'ITS Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and...

174

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

PITTSBURGH PLANT FOREST HILLS PITTSBURGH, PENNSYLVANIA Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and...

175

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

SYLVANIA-CORNING NUCLEAR CORPORATION BAYSIDE, NEW YORK VW. Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and...

176

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

COLUMBIA UNIVERSITY NEW YORK, NEW YORK Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning...

177

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

OF ARIZONA (U.S. BUREAU OF MINES) TUCSON, ARIZONA Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and...

178

Waterjet injection of powdered activated carbon for sediment remediation .  

E-Print Network (OSTI)

??"In situ sediment remediation through waterjet-activated carbon amendment delivery is an innovative means to mitigate the dangers posed by hydrophobic organic compounds. Ease of use… (more)

Redell, Chris J.

2011-01-01T23:59:59.000Z

179

Attenuation-Based Remedies in the Subsurface Applied Field Research...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

setting for researchers in both applied and basic science fields. A wealth of subsurface data is available to support research activities and remedial decision making. Led by the...

180

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

ELECTRIC CORPORATION BUILDING 7 BLOOMFIELD, NEW JERSEY SW 30 1985 Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of...

Note: This page contains sample records for the topic "risk-based preliminary remediation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

MANAGEMENT ALERT Remediation of Selected Transuranic Waste Drums...  

Office of Environmental Management (EM)

MANAGEMENT ALERT Remediation of Selected Transuranic Waste Drums at Los Alamos National Laboratory - Potential Impact on the Shutdown of the Department's Waste Isolation Plant DOE...

182

Innovative mathematical modeling in environmental remediation  

SciTech Connect

There are two different ways to model reactive transport: ad hoc and innovative reaction-based approaches. The former, such as the Kd simplification of adsorption, has been widely employed by practitioners, while the latter has been mainly used in scientific communities for elucidating mechanisms of biogeochemical transport processes. It is believed that innovative mechanistic-based models could serve as protocols for environmental remediation as well. This paper reviews the development of a mechanistically coupled fluid flow, thermal transport, hydrologic transport, and reactive biogeochemical model and example-applications to environmental remediation problems. Theoretical bases are sufficiently described. Four example problems previously carried out are used to demonstrate how numerical experimentation can be used to evaluate the feasibility of different remediation approaches. The first one involved the application of a 56-species uranium tailing problem to the Melton Branch Subwatershed at Oak Ridge National Laboratory (ORNL) using the parallel version of the model. Simulations were made to demonstrate the potential mobilization of uranium and other chelating agents in the proposed waste disposal site. The second problem simulated laboratory-scale system to investigate the role of natural attenuation in potential off-site migration of uranium from uranium mill tailings after restoration. It showed inadequacy of using a single Kd even for a homogeneous medium. The third example simulated laboratory experiments involving extremely high concentrations of uranium, technetium, aluminum, nitrate, and toxic metals (e.g.,Ni, Cr, Co).The fourth example modeled microbially-mediated immobilization of uranium in an unconfined aquifer using acetate amendment in a field-scale experiment. The purposes of these modeling studies were to simulate various mechanisms of mobilization and immobilization of radioactive wastes and to illustrate how to apply reactive transport models for environmental remediation.The second problem simulated laboratory-scale system to investigate the role of natural attenuation in potential off-site migration of uranium from uranium mill tailings after restoration. It showed inadequacy of using a single Kd even for a homogeneous medium.

Yeh, Gour T. [Taiwan Typhoon and Flood Research Institute (Taiwan); National Central Univ. (Taiwan); Univ. of Central Florida (United States); Gwo, Jin Ping (Jack) [Nuclear Regulatory Commission (NRC), Rockville, MD (United States); Siegel, Malcolm D. [Sandia National Laboratories, Albuquerque, NM (United States); Li, Ming-Hsu [National Central Univ. (Taiwan); ; Fang, Yilin [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Zhang, Fan [Inst. of Tibetan Plateau Research, Chinese Academy of Sciences (China); Luo, Wensui [Inst. of Tibetan Plateau Research, Chinese Academy of Sciences (China); Yabusaki, Steven B. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States)

2013-05-12T23:59:59.000Z

183

Remedial investigation/feasibility study Work Plan and addenda for Operable Unit 4-12: Central Facilities Area Landfills II and III at the Idaho National Engineering Laboratory  

SciTech Connect

This document is divided into two main sections -- the Work Plan and the addenda. The Work Plan describes the regulatory history and physical setting of Operable Unit 4-12, previous sampling activities, and data. It also identifies a preliminary conceptual model, preliminary remedial action alternatives, and preliminary applicable or relevant and appropriate requirements. In addition, the Work Plan discusses data gaps and data quality objectives for proposed remedial investigation activities. Also included are tasks identified for the remedial investigation/feasibility study (RI/FS) and a schedule of RI/FS activities. The addenda include details of the proposed field activities (Field Sampling Plan), anticipated quality assurance activities (Quality Assurance Project Plan), policies and procedures to protect RI/FS workers and the environment during field investigations (Health and Safety Plan), and policies, procedures, and activities that the Department of Energy will use to involve the public in the decision-making process concerning CFA Landfills II and III RI/FS activities (Community Relations Plan).

Keck, K.N.; Stormberg, G.J.; Porro, I.; Sondrup, A.J.; McCormick, S.H.

1993-07-01T23:59:59.000Z

184

New Pump and Treat Facility Remedial Action Work Plan for Test Area North (TAN) Final Groundwater Remediation, Operable Unit 1-07B  

SciTech Connect

This remedial action work plan identifies the approach and requirements for implementing the medical zone remedial action for Test Area North, Operable Unit 1-07B, at the Idaho National Engineering and Environmental Laboratory (INEEL). This plan details management approach for the construction and operation of the New Pump and Treat Facility. As identified in the remedial design/remedial action scope of work, a separate remedial design/remedial action work plan will be prepared for each remedial component of the Operable Unit 1-07B remedial action. This work plan was originally prepared as an early implementation of the final Phase C remediation. At that time, The Phase C implementation strategy was to use this document as the overall Phase C Work Plan and was to be revised to include the remedial actions for the other remedial zones (hotspot and distal zones). After the completion of Record of Decision Amendment: Technical Support Facility Injection Well (TSF-05) and Surrounding Groundwater Contamination (TSF-23) and Miscellaneous No Action Sites, Final Remedial Action, it was determined that each remedial zone would have it own stand-alone remedial action work plan. Revision 1 of this document converts this document to a stand-alone remedial action plan specific to the implementation of the New Pump and Treat Facility used for plume remediation within the medical zone of the OU 1-07B contaminated plume.

D. Vandel

2003-09-01T23:59:59.000Z

185

Preliminary Safety Design RM | Department of Energy  

Office of Environmental Management (EM)

Preliminary Safety Design RM Preliminary Safety Design RM The Preliminary Safety Design (PSD) Review Module (RM) is a tool that assists DOE federal project review teams in...

186

Access to Courts and Preemption of State Remedies in Collective Action Perspective  

E-Print Network (OSTI)

application of preemption doctrine to state judicial remedies. This article applies a “collective action” framework for preemption analysis to the issue of remedial preemption. Our analysis suggests that while remedial preemption may be justified in some...

Glicksman, Robert L.; Levy, Richard E.

2009-01-01T23:59:59.000Z

187

RCRA Information Brief, June 1996: Conditional remedies under RCRA correction action  

SciTech Connect

This document describes conditional remedies under RCRA corrective action. The definition of conditional remedies, criteria that must be met, applications to DOE facilities, applicable clean-up standards, and implementation of conditional remedies are discussed in the document.

NONE

1996-06-01T23:59:59.000Z

188

Characterization of complex mineral assemblages: Implications for contaminant transport and environmental remediation  

Science Journals Connector (OSTI)

...W P ( 1996 ) Ground Water 34 : 778 – 783...environmental remediation. | Surface...and biological remediation strategies...environmental effects ground water humic acids humic...pollutants pollution remediation risk assessment...

Paul M. Bertsch; John C. Seaman

1999-01-01T23:59:59.000Z

189

Microsoft PowerPoint - 2011_1012_Hansen_100-K_Remediation.pptx  

NLE Websites -- All DOE Office Websites (Extended Search)

K Area Remediation Summary of Draft Su a y o a t Remedial InvestigationFeasibility Study and Proposed Plan Study and Proposed Plan October 2011 Purpose * The 100-K Remedial...

190

New Pump and Treat Facility Remedial Action Work Plan For Test Area North Final Groundwater Remediation, Operable Unit 1-07B  

SciTech Connect

This remedial action work plan identifies the approach and requirements for implementing the medial zone remedial action for Test Area North, Operable Unit 1-07B, at the Idaho National Laboratory. This plan details the management approach for the construction and operation of the New Pump and Treat Facility (NPTF). As identified in the remediatial design/remedial action scope of work, a separate remedial design/remedial action work plan will be prepared for each remedial component of the Operable Unit 1-07B remedial action.

Nelson, L. O.

2007-06-12T23:59:59.000Z

191

Hydrogen Embrittlement of Pipeline Steels: Causes and Remediation  

E-Print Network (OSTI)

Hydrogen Embrittlement of Pipeline Steels: Causes and Remediation P. Sofronis, I. M. Robertson, D% · Contractor share: 25% · Barriers ­ Hydrogen embrittlement of pipelines and remediation (mixing with water;Objectives · To come up with a mechanistic understanding of hydrogen embrittlement in pipeline steels

192

Integration of biotechnology in remediation and pollution prevention activities  

SciTech Connect

The North American Free Trade Agreement/North American Agreement on Environmental Cooperation provides a mechanism for an international collaboration between the US, Canada, and Mexico to jointly develop, modify, or refine technologies that remediate or protect the environment. These countries have a vested interest in this type of collaboration because contaminants do not respect the boundaries of a manufacturing site, region, city, state, or country. The Environmental Sciences Division (ESD) at Oak Ridge National Laboratory (ORNL) consists of a diverse group of individuals who address a variety of environmental issues. ESD is involved in basic and applied research on the fate, transport, and remediation of contaminants; environmental assessment; environmental engineering; and demonstrations of advanced remediation technologies. The remediation and protection of the environment includes water, air, and soils for organic, inorganic, and radioactive contaminants. In addition to remediating contaminated sites, research also focuses on life-cycle analyses of industrial processes and the production of green technologies. The author focuses this discussion on subsurface remediation and pollution prevention; however, the research activities encompass water, soil and air and many of the technologies are applicable to all environments. The discussion focuses on the integration of biotechnology with remediation activities and subsequently linking these biological processes to other remediation technologies.

Strong-Gunderson, J.M. [Oak Ridge National Lab., TN (United States). Environmental Sciences Div.

1996-02-01T23:59:59.000Z

193

Remediation of the Maxey Flats Site. Final report  

SciTech Connect

This report describes issues associated with remedial action of Maxey Flats, a low-level radioactive waste disposal site from 1963-1977, located in Fleming County, Kentucky. Present remedial action alternatives being considered are discussed along with emergency plans, ground water monitoring plans, and budgets.

Not Available

1990-01-12T23:59:59.000Z

194

EA-1331: Remediation of Subsurface and Groundwater Contamination at the  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

331: Remediation of Subsurface and Groundwater Contamination at 331: Remediation of Subsurface and Groundwater Contamination at the Rock Springs in situ Oil Shale Retort Site, Sweetwater County, Wyoming EA-1331: Remediation of Subsurface and Groundwater Contamination at the Rock Springs in situ Oil Shale Retort Site, Sweetwater County, Wyoming SUMMARY This EA evaluates the environmental impacts for the proposal for the Rock Springs In-Situ Oil Shale Retort Test Site remediation that would be performed at the Rock Springs site in Sweetwater County, Wyoming. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD July 31, 2000 EA-1331: Finding of No Significant Impact Remediation of Subsurface and Groundwater Contamination at the Rock Springs in situ Oil Shale Retort Site July 31, 2000 EA-1331: Final Environmental Assessment

195

EIS-0198: Uranium Mill Tailings Remedial Action Groundwater Project |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

198: Uranium Mill Tailings Remedial Action Groundwater Project 198: Uranium Mill Tailings Remedial Action Groundwater Project EIS-0198: Uranium Mill Tailings Remedial Action Groundwater Project SUMMARY This EIS assesses the potential programmatic impacts of conducting the Ground Water Project, provides a method for determining the site-specific ground water compliance strategies, and provides data and information that can be used to prepare site-specific environmental impacts analyses more efficiently. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD April 28, 1997 EIS-0198: Record of Decision Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project (April 1997) December 1, 1996 EIS-0198: Programmatic Environmental Impact Statement Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project

196

Implementation of the Formerly Utilized Sites Remedial Action Program:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Implementation of the Formerly Utilized Sites Remedial Action Implementation of the Formerly Utilized Sites Remedial Action Program: Coordination Between the U.S. Department of Energy and the U.S. Army Corps of Engineers Implementation of the Formerly Utilized Sites Remedial Action Program: Coordination Between the U.S. Department of Energy and the U.S. Army Corps of Engineers Implementation of the Formerly Utilized Sites Remedial Action Program: Coordination Between the U.S. Department of Energy and the U.S. Army Corps of Engineers (Waste Management Conference 2010) Implementation of the Formerly Utilized Sites Remedial Action Program: Coordination Between the U.S. Department of Energy and the U.S. Army Corps of Engineers (Waste Management Conference 2010) More Documents & Publications Recent Developments in DOE FUSRAP

197

Summary - X-701B Groundwater Remedy, Portsmouth, Ohio  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

X-701B Groundwater Remediation ETR Report Date: December 2008 ETR-20 United States Department of Energy Office of Environmental Management (DOE-EM) External Technical Review of the X-701B Groundwater Remedy, Portsmouth, Ohio Why DOE-EM Did This Review The Department of Energy (DOE) Portsmouth Paducah Project Office (PPPO) has responsibility for remediation of the X-701B ground water plume with the key contaminant of trichloroethene (TCE). The remedy has been divided into four phases: Phase I- Initial Source Area Treatment, Phase II-Expanded Source Area Treatment, Phase III-Evaluation and Reporting, and Phase IV- Downgradient Remediation and Confirmation of Source Area Treatment. Phase II treatment has injected catalyzed hydrogen peroxide without meeting the

198

Independent Activity Report, Savannah River Remediation - July 2010 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Remediation - July 2010 Remediation - July 2010 Independent Activity Report, Savannah River Remediation - July 2010 July 2010 Savannah River Operations Office Integrated Safety Management System Phase II Verification Review of Savannah River Remediation The U.S. Department of Energy (DOE), Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), participated in the DOE Savannah River Operations Office (DOE-SR), Office of Safety and Quality Assurance (OSQA), Technical Support Division (TSD) Integrated Safety Management System (ISMS), Phase II Verification of Savannah River Remediation (SRR). The purpose of the DOE-SR Phase II ISMS Verification was to verify that the SRR ISMS Description that was submitted to and approved by the DOE-SR Manager is being effectively implemented at the Savannah

199

DOE Awards Contract for Environmental Remediation Services at California  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Remediation Services at Environmental Remediation Services at California Santa Susana Field Laboratory DOE Awards Contract for Environmental Remediation Services at California Santa Susana Field Laboratory September 27, 2012 - 12:00pm Addthis Media Contact Bill Taylor bill.taylor@srs.gov 803-952-8564 Cincinnati - The Department of Energy (DOE) today awarded a task order (contract) to CDM, A Joint Venture, of Fairfax, Virginia, to provide environmental remediation services for the Energy Technology Engineering Center at the Santa Susana Field Laboratory, Canoga Park, California. The cost-plus incentive fee task order has a 36-month performance period and a value of $11.3 million. CDM will continue to assist DOE in chemical sampling, the preparation of a chemical data gap analysis and preparing a soils remediation action

200

DEMONSTRATION OF ELECTROCHEMICAL REMEDIATION TECHNOLOGIES-INDUCED COMPLEXATION  

SciTech Connect

The Project Team is submitting this Topical Report on the results of its bench-scale demonstration of ElectroChemical Remediation Technologies (ECRTs) and in particular the Induced Complexation (ECRTs-IC) process for remediation of mercury contaminated soils at DOE Complex sites. ECRTs is an innovative, in-situ, geophysically based soil remediation technology with over 50 successful commercial site applications involving remediation of over two million metric tons of contaminated soils. ECRTs-IC has been successfully used to remediate 220 cu m of mercury-contaminated sediments in the Union Canal, Scotland. In that operation, ECRTs-IC reduced sediment total mercury levels from an average of 243 mg/kg to 6 mg/kg in 26 days of operation. The clean up objective was to achieve an average total mercury level in the sediment of 20 mg/kg.

Barry L. Burks

2002-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "risk-based preliminary remediation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Promoting decision making through a Sustainable Remediation Assessment Matrix (SRAM)  

Science Journals Connector (OSTI)

This paper describes the steps taken in a decision making process through a Sustainable Remediation Assessment Matrix (SRAM). The development of the SRAM deals with Complex, Large-scale Interconnected, Open, and Socio-technical System (CLIOS). For both large and small contaminated areas, considers potential impacts on neighbouring areas, the contribution to air emissions from the materials of the proposed project and the energy to be consumed. Along this line, the research focused on setting up a model under a systems perspective. A systemigram, from remedial investigation to project closeout, has been developed. For each stage of the remediation project, the process to identify stakeholders has been outlined. Moreover, and as an illustrative example, environmental, social, and economic aspects of remedial operations have been addressed on a specific case using the US Air Force Sustainable Remediation Tool (SRT).

Aspasia Kalomoiri; Washington Braida

2013-01-01T23:59:59.000Z

202

E-Print Network 3.0 - active chemical remediation Sample Search...  

NLE Websites -- All DOE Office Websites (Extended Search)

.405 Discovery or notification. 300.410 Removal site evaluation. 300.415 Removal action. 300.420 Remedial site... evaluation. 300.425 Establishing remedial...

203

Verification of Active and Passive Ground-Water Contamination Remediation Efforts  

Science Journals Connector (OSTI)

The verification of ground-water contamination remediation efforts requires thorough documentation of subsurface conditions ... comprehensive approach to the design and operation of remediation efforts with an em...

M. J. Barcelona

1995-01-01T23:59:59.000Z

204

An investigation of school factors related to enrollment in remedial writing at postsecondary institutions in Montana.  

E-Print Network (OSTI)

?? Remedial postsecondary coursework, while ubiquitous, is a high cost means for students to become prepared to complete the rigors of postsecondary education. Remedial coursework… (more)

Shipman, Dustin Harry

2011-01-01T23:59:59.000Z

205

An investigation of school factors related to enrollment in remedial writing at postsecondary institutions in Montana.  

E-Print Network (OSTI)

??Remedial postsecondary coursework, while ubiquitous, is a high cost means for students to become prepared to complete the rigors of postsecondary education. Remedial coursework represents… (more)

Shipman, Dustin Harry.

2011-01-01T23:59:59.000Z

206

120 Ground Water Monitoring & Remediation 32, no. 1/ Winter 2012/pages 120130 NGWA.org Ground Water Monitoring & Remediation  

E-Print Network (OSTI)

120 Ground Water Monitoring & Remediation 32, no. 1/ Winter 2012/pages 120­130 NGWA.org Ground Water Monitoring & Remediation © 2011, National Ground Water Association. Published 2011. This article known as emerging contaminants (ECs) to surrounding groundwater and surface water. ECs consist

207

DWPF SMECT PVV SAMPLE CHARACTERIZATION AND REMEDIATION  

SciTech Connect

On April 2, 2013, a solid sample of material collected from the Defense Waste Processing Facility’s Process Vessel Vent (PVV) jumper for the Slurry Mix Evaporator Condensate Tank (SMECT) was received at the Savannah River National Laboratory (SRNL). DWPF has experienced pressure spikes within the SMECT and other process vessels which have resulted in processing delays while a vacuum was re-established. Work on this sample was requested in a Technical Assistance Request (TAR). This document reports the results of chemical and physical property measurements made on the sample, as well as insights into the possible impact to the material using DWPF’s proposed remediation methods. DWPF was interested in what the facility could expect when the material was exposed to either 8M nitric acid or 90% formic acid, the two materials they have the ability to flush through the PVV line in addition to process water once the line is capped off during a facility outage.

Bannochie, C.; Crawford, C.

2013-06-18T23:59:59.000Z

208

Tank waste remediation system engineering plan  

SciTech Connect

This Engineering Plan describes the engineering process and controls that will be in place to support the Technical Baseline definition and manage its evolution and implementation to the field operations. This plan provides the vision for the engineering required to support the retrieval and disposal mission through Phase 1 and 2, which includes integrated data management of the Technical Baseline. Further, this plan describes the approach for moving from the ``as is`` condition of engineering practice, systems, and facilities to the desired ``to be`` configuration. To make this transition, Tank Waste Remediation System (TWRS) Engineering will become a center of excellence for TWRS which,will perform engineering in the most effective manner to meet the mission. TWRS engineering will process deviations from sitewide systems if necessary to meet the mission most effectively.

Rifaey, S.H.

1998-01-09T23:59:59.000Z

209

Environmental remediation and waste management information systems  

SciTech Connect

The purpose of this paper is to document a few of the many environmental information systems that currently exist worldwide. The paper is not meant to be a comprehensive list; merely a discussion of a few of the more technical environmental database systems that are available. Regulatory databases such as US Environmental Protection Agency`s (EPA`s) RODS (Records of Decision System) database [EPA, 1993] and cost databases such as EPA`s CORA (Cost of Remedial Action) database [EPA, 1993] are not included in this paper. Section 2 describes several US Department of Energy (DOE) Environmental Restoration and Waste Management (EM) information systems and databases. Section 3 discusses several US EPA information systems on waste sites and technologies. Section 4 summarizes a few of the European Community environmental information systems, networks, and clearinghouses. And finally, Section 5 provides a brief overview of Geographical Information Systems. Section 6 contains the references, and the Appendices contain supporting information.

Harrington, M.W.; Harlan, C.P.

1993-12-31T23:59:59.000Z

210

USING A RISK-BASED METHODOLOGY FOR THE TRANSFER OF RADIOACTIVE MATERIAL WITHIN THE SAVANNAH RIVER SITE BOUNDARY  

SciTech Connect

Shipment of radioactive materials (RAM) is discussed in the Code of Federal Regulations in parts of both 49 CFR and 10 CFR. The regulations provide the requirements and rules necessary for the safe shipment of RAM across public highways, railways, waterways, and through the air. These shipments are sometimes referred to as in-commerce shipments. Shipments of RAM entirely within the boundaries of Department of Energy sites, such as the Savannah River Site (SRS), can be made using methodology allowing provisions to maintain equivalent safety while deviating from the regulations for in-commerce shipments. These onsite shipments are known as transfers at the SRS. These transfers must follow the requirements approved in a site-specific Transportation Safety Document (TSD). The TSD defines how the site will transfer materials so that they have equivalence to the regulations. These equivalences are documented in an Onsite Safety Assessment (OSA). The OSA can show how a particular packaging used onsite is equivalent to that which would be used for an in-commerce shipment. This is known as a deterministic approach. However, when a deterministic approach is not viable, the TSD allows for a risk-based OSA to be written. These risk-based assessments show that if a packaging does not provide the necessary safety to ensure that materials are not released (during normal or accident conditions) then the worst-case release of materials does not result in a dose consequence worse than that defined for the SRS. This paper will discuss recent challenges and successes using this methodology at the SRS.

Loftin, B.; Watkins, R.; Loibl, M.

2010-06-03T23:59:59.000Z

211

Y-12 Plant remedial action Technology Logic Diagram: Volume 3, Technology evaluation data sheets: Part A, Remedial action  

SciTech Connect

The Y-12 Plant Remedial Action Technology Logic Diagram (TLD) was developed to provide a decision-support tool that relates environmental restoration (ER) problems at the Y-12 Plant to potential technologies that can remediate these problems. The TLD identifies the research, development, demonstration, testing, and evaluation needed for sufficient development of these technologies to allow for technology transfer and application to remedial action (RA) activities. The TLD consists of three volumes. Volume 1 contains an overview of the TLD, an explanation of the program-specific responsibilities, a review of identified technologies, and the rankings of remedial technologies. Volume 2 contains the logic linkages among environmental management goals, environmental problems and the various technologies that have the potential to solve these problems. Volume 3 contains the TLD data sheets. This report is Part A of Volume 3 and contains the Remedial Action section.

NONE

1994-09-01T23:59:59.000Z

212

Remedial investigation report for J-Field, Aberdeen Proving Ground, Maryland. Volume 1: Remedial investigation results  

SciTech Connect

This report presents the results of the remedial investigation (RI) conducted at J-Field in the Edgewood Area of Aberdeen Proving Ground (APG), a U.S. Army installation located in Harford County, Maryland. Since 1917, activities in the Edgewood Area have included the development, manufacture, and testing of chemical agents and munitions and the subsequent destruction of these materials at J-Field by open burning and open detonation. These activities have raised concerns about environmental contamination at J-Field. This RI was conducted by the Environmental Conservation and Restoration Division, Directorate of Safety, Health and Environmental Division of APG, pursuant to requirements outlined under the Comprehensive Environmental Response, Compensation, and Liability Act, as amended (CERCLA). The RI was accomplished according to the procedures developed by the U.S. Environmental Protection Agency (EPA 1988). The RI provides a comprehensive evaluation of the site conditions, nature of contaminants present, extent of contamination, potential release mechanisms and migration pathways, affected populations, and risks to human health and the environment. This information will be used as the basis for the design and implementation of remedial actions to be performed during the remedial action phase, which will follow the feasibility study (FS) for J-Field.

Yuen, C. R.; Martino, L. E.; Biang, R. P.; Chang, Y. S.; Dolak, D.; Van Lonkhuyzen, R. A.; Patton, T. L.; Prasad, S.; Quinn, J.; Rosenblatt, D. H.; Vercellone, J.; Wang, Y. Y.

2000-03-14T23:59:59.000Z

213

National Electric Transmission Congestion Study: Preliminary...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Electric Transmission Congestion Study: Preliminary Findings National Electric Transmission Congestion Study: Preliminary Findings The Department hosted three webinars in...

214

NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report The following information...

215

Effects of remediation amendments on vadose zone microorganisms  

SciTech Connect

Surfactant-based foam delivery technology has been studied to remediate Hanford 200 area deep vadose zone sediment. However, the surfactants and remediation amendments have an unknown effect on indigenous subsurface microorganisms. Microbial populations are important factors to consider in remediation efforts due to their potential to alter soil geochemistry. This project focuses on measuring microbial metabolic responses to remediation amendments in batch and column studies using Deep Vadose Zone Sediments. Initial studies of the microbes from Hanford 200 area deep vadose zone sediment showed surfactants sodium dodecyl sulfate (SDS) and cocamidopropyl betaine (CAPB) and remediation amendment calcium polysulfide (CPS) had no affect on microbial growth using BiologTM Ecoplates. To move towards a more realistic field analog, soil columns were packed with Hanford 200 Area sediment. Once microbial growth in the column was verified by observing growth of the effluent solution on tryptic soy agar plates, remedial surfactants were injected into the columns, and the resulting metabolic diversity was measured. Results suggest surfactant sodium dodecyl sulfate (SDS) stimulates microbial growth. The soil columns were also visualized using X-ray microtomography to inspect soil packing and possibly probe for evidence of biofilms. Overall, BiologTM Ecoplates provide a rapid assay to predict effects of remediation amendments on Hanford 200 area deep vadose zone microorganisms.

Miller, Hannah M.; Tilton, Fred A.

2012-08-10T23:59:59.000Z

216

Preliminary Safety Design RM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Preliminary Safety Design Review Module Preliminary Safety Design Review Module March 2010 CD-0 O 0 OFFICE OF Pr C CD-1 F ENVIRO Standard R reliminar Rev Critical Decis CD-2 M ONMENTAL Review Plan ry Safety view Module sion (CD) Ap CD March 2010 L MANAGE n (SRP) y Design e pplicability D-3 EMENT CD-4 Post Ope eration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM project review process encompasses key milestones established by DOE O 413.3A, Change 1, Program and Project Management for the Acquisition of Capital Assets, DOE-STD-1189-2008,

217

Preliminary Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Walla Walla-Tucannon River Transmission Line Walla Walla-Tucannon River Transmission Line Rebuild Project Revision Sheet for the Environmental Assessment Finding of No Significant Impact Mitigation Action Plan DOE/EA-1731 Bonneville Power Administration May 2011 Walla Walla-Tucannon Transmission Line Rebuild Project 1 Revision Sheet for Final Environmental Assessment Revision Sheet for the Walla Walla-Tucannon River Transmission Line Rebuild Project Final Environmental Assessment DOE/EA-1731 Summary This revision sheet documents the changes to be incorporated into the Walla Walla-Tucannon River Transmission Line Rebuild Project Preliminary Environmental Assessment (EA). With the addition of these changes, the Preliminary EA will not be reprinted and will serve as the Final

218

Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site, Maybell, Colorado. Remedial action selection report: Attachment 2, Geology report, Final  

SciTech Connect

The Maybell uranium mill tailings site is 25 miles (mi) (40 kilometers [km]) west of the town of Craig, Colorado, in Moffat County, in the northwestern part of the state. The unincorporated town of Maybell is 5 road mi (8 km) southwest of the site. The designated site covers approximately 110 acres (ac) (45 hectares [ha]) and consists of a concave-shaped tailings pile and rubble from the demolition of the mill buildings buried in the former mill area. Contaminated materials at the Maybell processing site include the tailings pile, which has an average depth of 20 feet (ft) (6 meters [m]) and contains 2.8 million cubic yards (yd{sup 3}) (2.1 million cubic meters [m{sup 3}]) of tailings. The former mill processing area is on the north side of the site and contains 20,000 yd{sup 3} (15,000 m{sup 3}) of contaminated demolition debris. Off-pile contamination is present and includes areas adjacent to the tailings pile, as well as contamination dispersed by wind and surface water flow. The volume of off-pile contamination to be placed in the disposal cell is 550,000 yd{sup 3} (420,000 m{sup 3}). The total volume of contaminated materials to be disposed of as part of the remedial action is estimated to be 3.37 million yd{sup 3} (2.58 million m{sup 3}). Information presented in this Final Remedial Action Plan (RAP) and referenced in supporting documents represents the current disposal cell design features and ground water compliance strategy proposed by the US Department of Energy (DOE) for the Maybell, Colorado, tailings site. Both the disposal cell design and the ground water compliance strategy have changed from those proposed prior to the preliminary final RAP document as a result of prudent site-specific technical evaluations.

Not Available

1994-06-01T23:59:59.000Z

219

FORMERLY REMEDIAL UTILIZED SITES ACTION PROGRAM ELIMINATION REPORT ELIMINATION REPORT  

Office of Legacy Management (LM)

(' (' . . FORMERLY REMEDIAL UTILIZED SITES ACTION PROGRAM ELIMINATION REPORT ELIMINATION REPORT FORMER VITRO LABORATORIES FORMER VITRO LABORATORIES VITRO CORPORATION VITRO CORPORATION WEST ORANGE, NEW JERSEY WEST ORANGE, NEW JERSEY SEP 30 1985 SEP 30 1985 Department of Energy Office of Nuclear Waste Office of Remedial Action and Waste Technology Division of Facility and Site Deconxnissioning Projects . CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES iii Page 7 3 4 - _- mI _---. ELSMINATION REPORT FORMER VITRO LABORATORIES, VITRO CORPORATION, WEST ORAN6E, NEW JERSEY INTRODUCTION . The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site

220

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM . ELIMINATION REPORT FOR AL-TECH SPECIALTY STEEL CORPORATION (THE FORMER ALLEGHENY-LUDLUM STEEL CORPORATION) _ WATERYLIET, NEW YORK, AND DUNKIRK, NEW YORK SEP 301985 Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects ----- ----_l_.._- .._. _- CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES iii .- --- .- Page . 1 4 ELIMINATION REPORT AL-TECH SPECIALTY STEEL CORPORATION (THE FORMER ALLEGHENY-LUDLUM STEEL CORPORATION) WATERYLIET, NEW YORK, AND DUNKIRK, NEW YORK 1 INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office

Note: This page contains sample records for the topic "risk-based preliminary remediation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

I I c. ,..I -. i FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT FOR BRIDGEPORT BRASS COMPANY HAVENS LABORATORY (REACTIVE METALS, INC.) KOSSUTH AND PULASKI STREETS BRIDGEPORT, CONNECTICUT i Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decomnissioning Projects CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES Page 1 . 2 ii .-_. _.--_- "~ ELIMINATION REPORT FORMER BRIDGEPORT BRASS COMPANY HAVENS LABORATORY (REACTIVE METALS, INC. 1 KOSSUTH AND PULASKI STREETS BRIDGEPORT, CONNECTICUT INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and kaste Technology, Division of Facility and Site

222

Sulfate Reduction in Groundwater: Characterization and Applications for Remediation  

SciTech Connect

Sulfate is ubiquitous in groundwater, with both natural and anthropogenic sources. Sulfate reduction reactions play a significant role in mediating redox conditions and biogeochemical processes for subsurface systems. They also serve as the basis for innovative in-situ methods for groundwater remediation. An overview of sulfate reduction in subsurface environments is provided, with a specific focus on implications for groundwater remediation. A case study presenting the results of a pilot-scale ethanol injection test illustrates the advantages and difficulties associated with the use of electron-donor amendments for sulfate remediation.

Miao, Z.; Brusseau, M. L.; Carroll, Kenneth C.; Carreon-Diazconti, C.; Johnson, B.

2012-06-01T23:59:59.000Z

223

Iowa Land Recycling and Environmental Remediation Standards Act (Iowa) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Iowa Land Recycling and Environmental Remediation Standards Act Iowa Land Recycling and Environmental Remediation Standards Act (Iowa) Iowa Land Recycling and Environmental Remediation Standards Act (Iowa) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Iowa Program Type Environmental Regulations Provider Iowa Department of Natural Resources

224

PRELIMINARY SURVEY OF U.S. STEEL CORPORATION--AGRI-CHEMICAL  

Office of Legacy Management (LM)

PRELIMINARY SURVEY OF PRELIMINARY SURVEY OF U.S. STEEL CORPORATION--AGRI-CHEMICAL (former Armour Fertilizer Works) Bartow, Florida Work performed by the Health and Safety Research Division Oak Ridge National Laboratory Oak Ridge, Tennessee 37830 March 1980 OAK RIDGE NATIONAL LABORATORY operated by UNION CARBIDE CORPORATION for the DEPARTMENT OF ENERGY as part of the Formerly Utilized Sites-- Remedial Action Program ..- _ "." --~ ____- - .___ _ --.. U.S. STEEL CORPORATION--AGRI-CHEMICAL (former Armour Fertilizer Works) Bartow, Florida At the request of the Department of Energy (DOE, then ERDA), a preliminary survey was performed at the U.S. Steel Corporation--Agri- Chemical Plant near Bartow, Florida (see Fig. l), on April 4, 1977, to assess the radiological status of those facilities utilized under Atomic

225

WATER AS A REAGENT FOR SOIL REMEDIATION  

SciTech Connect

SRI International is conducting experiments to develop and evaluate hydrothermal extraction technology or hot water extraction (HWE) technology for remediating petroleum-contaminated soils. Most current remediation practices either fail to remove the polycyclic aromatic hydrocarbons (PAHs) found in petroleum-contaminated sites, are too costly, or require the use of organic solvents at the expense of additional contamination and with the added cost of recycling solvents. Hydrothermal extraction offers the promise of efficiently extracting PAHs and other kinds of organics from contaminated soils at moderate temperatures and pressures, using only water and inorganic salts such as carbonate. SRI has conducted experiments to measure the solubility and rate of solubilization of selected PAHs (fluoranthene, pyrene, chrysene, 9,10-dimethylanthracene) in water using SRI's hydrothermal optical cell with the addition of varying amounts of sodium carbonate to evaluate the efficiency of the technology for removing PAHs from the soil. SRI data shows a very rapid increase in solubility of PAHs with increase in temperature in the range 25-275 C. SRI also measured the rate of solubilization, which is a key factor in determining the reactor parameters. SRI results for fluoranthene, pyrene, chrysene, and 9,10-dimethylanthracene show a linear relationship between rate of solubilization and equilibrium solubility. Also, we have found the rate of solubilization of pyrene at 275 C to be 6.5 ppm/s, indicating that the equilibrium solubilization will be reached in less than 3 min at 275 C; equilibrium solubility of pyrene at 275 C is 1000 ppm. Also, pyrene and fluoranthene appear to have higher solubilities in the presence of sodium carbonate. In addition to this study, SRI studied the rate of removal of selected PAHs from spiked samples under varying conditions (temperature, pore sizes, and pH). We have found a higher removal of PAHs in the presence of sodium carbonate in both sand and bentonite systems. Also, sodium carbonate greatly reduces the possible reactor corrosion under hydrothermal conditions. Our results show that a water-to-sand ratio of at least 3:1 is required to efficiently remove PAH from soil under static conditions.

Indira S. Jayaweera; Montserrat Marti-Perez; Jordi Diaz-Ferrero; Angel Sanjurjo

2001-03-29T23:59:59.000Z

226

THE RELATIONSHIP BETWEEN THE RADIATION SURVEY AND SITE INVESTIGATION PROCESS, THE CERCLA REMEDIAL OR REMOVAL  

E-Print Network (OSTI)

Assessment Site Inspection Remedial Investigation Feasibility Study Remedial Design/ Remedial Action PassAPPENDIX F THE RELATIONSHIP BETWEEN THE RADIATION SURVEY AND SITE INVESTIGATION PROCESS, THE CERCLA REMEDIAL OR REMOVAL PROCESS, AND THE RCRA CORRECTIVE ACTION PROCESS This appendix presents a discussion

227

Managing Legacy Records for Formerly Utilized Sites Remedial Action Program Sites  

Energy.gov (U.S. Department of Energy (DOE))

Managing Legacy Records for Formerly Utilized Sites Remedial Action Program Sites (Waste Management Conference 2008)

228

REMEDIATION OF HIGH WATER CONTENT GEOMATERIALS: A REVIEW OF GEOTEXTILE FILTER PERFORMANCE  

E-Print Network (OSTI)

costly remediation alternatives is capping of surface impoundments such as lagoons, ponds or old quarries

Aydilek, Ahmet

229

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT FOR OCCIDENTAL CHEMICAL CORPORATION ( FORMER HOOKER ELECTROCHEMICAL COMPANY ) NIAGARA FALLS, NEW YORK SEP 30 1985 Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects ELIMINATION REPORT FOR OCCIDENTAL CHEMICAL CORPORATION (FORMER HOOKER ELECTROCHEMICAL COMPANY) L NIAGARA FALLS, NEW YORK- INTRODUCTION The Department ' of Energy (DDE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decommissioning Projects (and/or the predecessor agencies, offices, and divisions), has reviewed the past activities of the Manhattan Engineer District (MED) and the Atomic Energy Commission (MED/AEC) at

230

CH2M HILL Plateau Remediation Company | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CH2M HILL Plateau Remediation Company CH2M HILL Plateau Remediation Company CH2M HILL Plateau Remediation Company The Office of Hea1th, Safety and Security's Office of Enforcement and Oversight has evaluated the facts and circumstances of a series of radiological work deficiencies at the Plutonium Finishing Plant (PFP) and the 105 K-East Reactor Facility (105KE Reactor) by CH2M HILL Plateau Remediation Company (CHPRC). The radiological work deficiencies at PFP are documented in the April 29, 2011, Department of Energy Richland Operations Office (DOE-RL) Surveillance Report S-11-SED-CHP~C-PFP-002, Planning and Execution of Radiological Work. S-11-SED-CHPRC-PFP-002 documented four examples where inadequate hazard analysis resulted in airborne radioactivity that exceeded the limits of the controlling radiological work permit.

231

Integrated Systems-Based Approach to Monitoring Environmental Remediation  

SciTech Connect

The US Department of Energy (DOE) is responsible for risk reduction and cleanup of its nuclear weapons complex. Remediation strategies for some of the existing contamination use techniques that mitigate risk, but leave contaminants in place. Monitoring to verify remedy performance and long-term mitigation of risk is a key element for implementing these strategies and can be a large portion of the total cost of remedy implementation. Especially in these situations, there is a need for innovative monitoring approaches that move away from the cost and labor intensive point-source monitoring. A systems-based approach to monitoring design focuses monitoring on controlling features and processes to enable effective interpretation of remedy performance.

Bunn, Amoret L.; Truex, Michael J.; Oostrom, Martinus; Carroll, Kenneth C.; Wellman, Dawn M.

2013-02-24T23:59:59.000Z

232

Integrated Systems-Based Approach to Monitoring Environmental Remediation - 13211  

SciTech Connect

The US Department of Energy (DOE) is responsible for risk reduction and cleanup of its nuclear weapons complex. Remediation strategies for some of the existing contamination use techniques that mitigate risk, but leave contaminants in place. Monitoring to verify remedy performance and long-term mitigation of risk is a key element for implementing these strategies and can be a large portion of the total cost of remedy implementation. Especially in these situations, there is a need for innovative monitoring approaches that move away from the cost and labor intensive point-source monitoring. A systems-based approach to monitoring design focuses monitoring on controlling features and processes to enable effective interpretation of remedy performance. (authors)

Truex, Mike; Oostrom, Mart; Carroll, K.C.; Bunn, Amoret; Wellman, Dawn [Pacific Northwest National Laboratory (PNNL), Richland, Washington (United States)] [Pacific Northwest National Laboratory (PNNL), Richland, Washington (United States)

2013-07-01T23:59:59.000Z

233

Oak Ridge Associated Universities OF Preparedfor REMEDIAL ACTIONS  

Office of Legacy Management (LM)

-7 8,-7 C 7 I 2o.1-1o 1 ORAU 891-29 Prepared by VERIFICATION Oak Ridge Associated Universities OF Preparedfor REMEDIAL ACTIONS ecommissioning ALBANY RESEARCH CENTER...

234

Groundwater remediation at a former oil service site  

E-Print Network (OSTI)

not only because I spent more time on it than any other project, but also because it represents the broadness and depth of a typical URS remediation project. In this report, findings from previous environmental investigations were summarized and used...

Han, Liping

2005-08-29T23:59:59.000Z

235

DRAFT HAB Advice: Remedial Investigation/Feasibility Study and...  

NLE Websites -- All DOE Office Websites (Extended Search)

HAB Advice: Remedial InvestigationFeasibility Study and Proposed Plan for the 100-FR-1, 100-FR-2, 100-FR-3, 100-IU-2 and 100-IU-6 Operable Units; DOERL Authors; Shelley Cimon,...

236

Summary - Building C-400 Thermal Treatment Remedial Design Report...  

Office of Environmental Management (EM)

Management (DOE-EM) External Technical Review of Building C-400 Thermal Treatment 90% Remedial Design Report and Site Investigation, Paducah Kentucky Why DOE-EM Did This Review...

237

300 Area Remedial Investigation/Feasibility Study and Proposed...  

NLE Websites -- All DOE Office Websites (Extended Search)

S. Hudson Page 1 of 2 300 Area Remedial InvestigationFeasibility Study and Proposed Plan Deconstruct Advice Points (paragraph number ) 4-1 The Board believes the Tri-Party...

238

Applications of triazine chemistry: education, remediation, and drug delivery  

E-Print Network (OSTI)

and its effect on the environment and society. The modification of chitosan for herbicide remediation has been accomplished using triazine chemistry, as well. Treatment of chitosan iteratively with cyanuric chloride followed by piperazine produces...

Hatfield, Susan Elizabeth

2009-05-15T23:59:59.000Z

239

Transfer and commercialisation of contaminated groundwater remediation technologies  

Science Journals Connector (OSTI)

High costs and poor performance of conventional groundwater remediation technologies have brought a call for the deployment of innovative technologies capable of attaining regulatory standards while satisfying time and budget constraints. To develop an innovative technology in the laboratory and ultimately transition it to full-scale commercialisation, presents challenges at various levels. Scientific and engineering problems and regulatory and legal issues exist that must be dealt with when moving a technology from the laboratory to the field. Importantly, cost and performance data must be presented in a manner that convinces stakeholders that the technology can accomplish remediation more economically, safely and efficiently than conventional technologies. The challenges of transferring and commercialising innovative groundwater remediation technologies and strategies that may be used to help overcome these challenges are discussed. Case studies of groundwater remediation technology transfer are presented.

Mark N. Goltz; Kenneth J. Williamson

2002-01-01T23:59:59.000Z

240

Uranium mining legacies remediation and renaissance development: an international overview  

Science Journals Connector (OSTI)

The uranium mining industry has a record of environmental management that has been very variable over the past 50 years. Although there have been examples of good remediation in some countries, sadly there are...

Peter Waggitt

2008-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "risk-based preliminary remediation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

SBA Increases Size Standards for Waste Remediation Services &  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SBA Increases Size Standards for Waste Remediation Services & SBA Increases Size Standards for Waste Remediation Services & Information/Admin Support SBA Increases Size Standards for Waste Remediation Services & Information/Admin Support December 12, 2012 - 10:22am Addthis John Hale III John Hale III Director, Office of Small and Disadvantaged Business Utilization Earlier this week, the U.S. Small Business Administration announced that they have revised size definitions for small businesses in Administrative and Support & Waste Management and Remediation Services categories, saying these revisions "reflect changes in marketplace conditions." The new standards are published in the Federal Register. Increases to size standards will enable some growing small businesses in these sectors to retain their small business status; will give federal

242

Leg 193 Preliminary Report 81 82 Leg 193 Preliminary Report  

E-Print Network (OSTI)

Leg 193 Preliminary Report 81 Figure 28 cm 122 128 116 114 118 120 124 128 130 Figure 28 #12;82 Leg 193 Preliminary Report Figure 29A Depth(mbsf) 0 100 50 UNITS 2 and 3 UNITS 4­14 UNIT 15 UNITS 16Green silica-clay alteration Figure 29A #12;Leg 193 Preliminary Report 83 Depth(mbsf) 100 50 150 200 1 2 3 4 5

243

The 100-C-7 Remediation Project. An Overview of One of DOE's Largest Remediation Projects - 13260  

SciTech Connect

The U.S. Department of Energy Richland Operations Office (RL), U.S. Environmental Protection Agency (EPA) and Washington Closure Hanford LLC (WCH) completed remediation of one of the largest waste sites in the U.S. Department of Energy complex. The waste site, 100-C-7, covers approximately 15 football fields and was excavated to a depth of 85 feet (groundwater). The project team removed a total of 2.3 million tons of clean and contaminated soil, concrete debris, and scrap metal. 100-C-7 lies in Hanford's 100 B/C Area, home to historic B and C Reactors. The waste site was excavated in two parts as 100-C-7 and 100-C-7:1. The pair of excavations appear like pit mines. Mining engineers were hired to design their tiered sides, with safety benches every 17 feet and service ramps which allowed equipment access to the bottom of the excavations. The overall cleanup project was conducted over a span of almost 10 years. A variety of site characterization, excavation, load-out and sampling methodologies were employed at various stages of remediation. Alternative technologies were screened and evaluated during the project. A new method for cost effectively treating soils was implemented - resulting in significant cost savings. Additional opportunities for minimizing waste streams and recycling were identified and effectively implemented by the project team. During the final phase of cleanup the project team applied lessons learned throughout the entire project to address the final, remaining source of chromium contamination. The C-7 cleanup now serves as a model for remediating extensive deep zone contamination sites at Hanford. (authors)

Post, Thomas C. [U.S. Department of Energy Richland Operations Office, Richland, WA 99352 (United States)] [U.S. Department of Energy Richland Operations Office, Richland, WA 99352 (United States); Strom, Dean [Washington Closure Hanford LLC, 2620 Fermi Avenue, Richland, WA 99354 (United States)] [Washington Closure Hanford LLC, 2620 Fermi Avenue, Richland, WA 99354 (United States); Beulow, Laura [U.S. Environmental Protection Agency, 309 Bradley Boulevard, Suite 115, Richland, WA 99352 (United States)] [U.S. Environmental Protection Agency, 309 Bradley Boulevard, Suite 115, Richland, WA 99352 (United States)

2013-07-01T23:59:59.000Z

244

Remediation of Uranium Impacted Sediments in a Watercourse - 12486  

SciTech Connect

In 2009, remediation was initiated for a non-operational fuel cycle facility previously used for government contract work. Between 2009 and the spring of 2011, remediation efforts were focused on demolition of contaminated buildings and removal of contaminated soil. In the late spring of 2011, the last phase of remediation commenced involving the removal of contaminated sediments from portions of a 1,200 meter long gaining stream. Planning and preparation for remediation of the stream began in 2009 with submittal of permit applications to undertake construction activities in a wetland area. The permitting process was lengthy and involved securing permits from multiple agencies. However, early and frequent communication with stakeholders played an integral role in efficiently obtaining the permit approvals. Frequent communication with stakeholders throughout the planning and remediation process also proved to be a key factor in timely completion of the project. The remediation of the stream involved the use of temporary bladder berms to divert surface water flow, water diversion piping, a sediment vacuum removal system, excavation of sediments using small front-end loaders, sediment dewatering, and waste packaging, transportation and disposal. Many safeguards were employed to protect several species of concern in the work area, water management during project activities, challenges encountered during the project, methods of Final Status Survey, and stream restoration. The planning and permitting effort for the Site Brook remediation began in May 2009 and permits were approved and in place by February 2011. The remediation and restoration of the Site Brook began in April 2011 and was completed in November 2011. The remediation of the Site Brook involved the use of temporary bladder berms to divert surface water flow, water diversion piping, a sediment vacuum removal system, excavation of sediments using small front-end loaders, sediment dewatering, and waste packaging, transportation, disposal, FSS, and restoration. Early and frequent communications with stakeholders proved to be a key factor in timely completion of the project. Challenges encountered during the remediation effort were overcome by proper planning and having preparedness procedures in place prior to executing the work. With the remediation and restoration successfully completed, the only remaining task is to monitor/maintain the restoration for 10 years. (authors)

Shephard, E.; Walter, N.; Downey, H.; Collopy, P. [AMEC E and I, Inc., 511 Congress Street, Suite 200, Portland, ME 04101 (United States); Conant, J. [ABB, Inc., 5 Waterside Crossing, Windsor, CT 06095 (United States)

2012-07-01T23:59:59.000Z

245

FOAM: NOVEL DELIVERY TECHNOLOGY FOR REMEDIATION OF VADOSE ZONE ENVIRONMENTS  

SciTech Connect

Deep vadose zone environments can be a primary source and pathway for contaminant migration to groundwater. These environments present unique characterization and remediation challenges that necessitate scrutiny and research. The thickness, depth, and intricacies of the deep vadose zone, combined with a lack of understanding of the key subsurface processes (e.g., biogeochemical and hydrologic) affecting contaminant migration, make it difficult to create validated conceptual and predictive models of subsurface flow dynamics and contaminant behavior across multiple scales. These factors also make it difficult to design and deploy sustainable remedial approaches and monitor long-term contaminant behavior after remedial actions. Functionally, the methods for addressing contamination must remove and/or reduce transport of contaminants. This problem is particularly challenging in the arid western United States where the vadose zone is hundreds of feet thick, rendering transitional excavation methods exceedingly costly and ineffective. Delivery of remedial amendments is one of the most challenging and critical aspects for all remedy-based approaches. The conventional approach for delivery is through injection of aqueous remedial solutions. However, heterogeneous deep vadose zone environments present hydrologic and geochemical challenges which limit the effectiveness. Because the flow of solution infiltration is dominantly controlled by gravity and suction, injected liquid preferentially percolates through highly permeable pathways, by-passing low-permeability zones which frequently contain the majority of contamination. Moreover, the wetting front can readily mobilize and enhance contaminant transport to the underlying aquifer prior to stabilization. Development of innovative, in-situ technologies may be the only way to meet remedial action objectives and long-term stewardship goals. Surfactants can be used to lower the liquid surface tension and create stabile foams, which readily penetrate low permeability zones. Although surfactant foams have been utilized for subsurface mobilization efforts in the oil and gas industry, so far, the concept of using foams as a delivery mechanism for transporting remedial amendments into deep vadose zone environments to stabilize metal and long-lived radionuclide contaminants has not been explored. Foam flow can be directed by pressure gradients, rather than being dominated by gravity; and, foam delivery mechanisms limit the volume of water (< 5% vol.) required for remedy delivery and emplacement, thus mitigating contaminant mobilization. We will present the results of a numerical modeling and integrated laboratory- / intermediate-scale investigation to simulate, develop, demonstrate, and monitor (i.e. advanced geophysical techniques and advanced predictive biomarkers) foam-based delivery of remedial amendments to remediate metals and radionuclides in vadose zone environments.

Jansik, Danielle P.; Wellman, Dawn M.; Mattigod, Shas V.; Zhong, Lirong; Wu, Yuxin; Foote, Martin; Zhang, Z. F.; Hubbard, Susan

2011-07-05T23:59:59.000Z

246

Salmon Site Remedial Investigation Report - Volume I  

Office of Legacy Management (LM)

494-VOL I/REV 1 494-VOL I/REV 1 U.S. Department of Energy Nevada Operations Office E nv i r onm ent al R es t or at i on D i v i s i on N ev ada E nv i r onm ent al R es t or at i on Pr oj ect S al m on S i t e R em edi al Inv es t i gat i on R epor t Vol u m e I R ev i s i on N o. : 1 S ept em ber 1999 Approved for public release; further dissemination unlimited. This page intentionally left blank DOE/NV--494-VOL I/REV 1 SALMON SITE REMEDIAL INVESTIGATION REPORT DOE Nevada Operations Office Las Vegas, Nevada Revision No.: 1 September 1999 Approved for public release; further dissemination unlimited. Available to the public from - U.S. Department of Commerce National Technical Information Service 5285 Port Royal Road Springfield, VA 22161 (703) 487-4650 Available electronically at http://www.doe.gov/bridge. Available to U.S. Department of Energy and its contractors in paper from -

247

WATER AS A REAGENT FOR SOIL REMEDIATION  

SciTech Connect

SRI International conducted experiments in a two-year, two-phase process to develop and evaluate hydrothermal extraction technology, also known as hot water extraction (HWE) technology, to separate petroleum-related contaminants and other hazardous pollutants from soil and sediments. In this process, water with added electrolytes (inexpensive and environmentally friendly) is used as the extracting solvent under subcritical conditions (150-300 C). The use of electrolytes allows us to operate reactors under mild conditions and to obtain high separation efficiencies that were hitherto impossible. Unlike common organic solvents, water under subcritical conditions dissolves both organics and inorganics, thus allowing opportunities for separation of both organic and inorganic material from soil. In developing this technology, our systematic approach was to (1) establish fundamental solubility data, (2) conduct treatability studies with industrial soils, and (3) perform a bench-scale demonstration using a highly contaminated soil. The bench-scale demonstration of the process has shown great promise. The next step of the development process is the successful pilot demonstration of this technology. Once pilot tested, this technology can be implemented quite easily, since most of the basic components are readily available from mature technologies (e.g., steam stripping, soil washing, thermal desorption). The implementation of this technology will revolutionize the conventional use of water in soil remediation technologies and will provide a stand-alone technology for removal of both volatile and heavy components from contaminated soil.

Indira S. Jayaweera; Montserrat Marti-Perez; Jordi Diaz-Ferrero; Angel Sanjurjo

2001-11-12T23:59:59.000Z

248

Remedial Action and Waste Disposal Conduct of OperationsMatrix  

SciTech Connect

This Conduct of Operations (CONOPS) matrix incorporates the Environmental Restoration Disposal Facility (ERDF) CONOPS matrix (BHI-00746, Rev. 0). The ERDF CONOPS matrix has been expanded to cover all aspects of the RAWD project. All remedial action and waste disposal (RAWD) operations, including waste remediation, transportation, and disposal at the ERDF consist of construction-type activities as opposed to nuclear power plant-like operations. In keeping with this distinction, the graded approach has been applied to the developmentof this matrix.

M. A. Casbon.

1999-05-24T23:59:59.000Z

249

Commencement Bay Nearshore/Tideflats Remedial Investigation. summary report  

SciTech Connect

The report summarizes work complete under the U.S. EPA/WDOE Cooperative Agreement for the Commencement Bay Nearshore/Tideflats Remedial Investigation of the Waterways/Shoreline area. The Commencement Bay Superfund Investigation includes various integrated program management and technical components. These include assessments of chemical contamination, biological effects, toxicity, and public health concerns; identification of sources; and identification of potential remedial actions and technologies.

Not Available

1985-08-01T23:59:59.000Z

250

A New Approach to Wastewater Remediation Based on Bifunctional Electrodes  

Science Journals Connector (OSTI)

A New Approach to Wastewater Remediation Based on Bifunctional Electrodes ... To illustrate this innovative technique, TiO2/Ti/Ta2O5?IrO2 bifunctional electrodes were prepared using a facile thermal decomposition technique and employed in this study. ... The establishment and enforcement of limits for the discharge and/or disposal of toxic and hazardous materials has required the development of new technologies to effectively remediate a variety of gaseous and liquid effluents, solid waste and sludge. ...

Robert Matthew Asmussen; Min Tian; Aicheng Chen

2009-05-29T23:59:59.000Z

251

Preliminary performance of HT datalink  

SciTech Connect

Preliminary performance of HT HS datalink at room temperature over 5000ft of wireline. The data shows ablility of the datalink to adapt by decreasing speed.

Cieslewski, Grzegorz

2014-02-11T23:59:59.000Z

252

AEO2014: Preliminary Industrial Output  

Gasoline and Diesel Fuel Update (EIA)

Elizabeth Sendich, Analyst, and Kay Smith, Team Leader Macroeconomic Analysis Team September 26, 2013 Preliminary AEO2014 Macroeconomic Industrial Results DO NOT CITE OR...

253

Preliminary performance of HT datalink  

DOE Data Explorer (OSTI)

Preliminary performance of HT HS datalink at room temperature over 5000ft of wireline. The data shows ablility of the datalink to adapt by decreasing speed.

Cieslewski, Grzegorz

254

Optimized remedial groundwater extraction using linear programming  

SciTech Connect

Groundwater extraction systems are typically installed to remediate contaminant plumes or prevent further spread of contamination. These systems are expensive to install and maintain. A traditional approach to designing such a wellfield uses a series of trial-and-error simulations to test the effects of various well locations and pump rates. However, the optimal locations and pump rates of extraction wells are difficult to determine when objectives related to the site hydrogeology and potential pumping scheme are considered. This paper describes a case study of an application of linear programming theory to determine optimal well placement and pump rates. The objectives of the pumping scheme were to contain contaminant migration and reduce contaminant concentrations while minimizing the total amount of water pumped and treated. Past site activities at the area under study included disposal of contaminants in pits. Several groundwater plumes have been identified, and others may be present. The area of concern is bordered on three sides by a wetland, which receives a portion of its input budget as groundwater discharge from the pits. Optimization of the containment pumping scheme was intended to meet three goals: (1) prevent discharge of contaminated groundwater to the wetland, (2) minimize the total water pumped and treated (cost benefit), and (3) avoid dewatering of the wetland (cost and ecological benefits). Possible well locations were placed at known source areas. To constrain the problem, the optimization program was instructed to prevent any flow toward the wetland along a user-specified border. In this manner, the optimization routine selects well locations and pump rates so that a groundwater divide is produced along this boundary.

Quinn, J.J.

1995-12-31T23:59:59.000Z

255

PRELIMINARY SURVEY OF SYLVANIA-CORNING NUCLEAR CORPORATION METALLURGICAL LABORATORY  

Office of Legacy Management (LM)

SYLVANIA-CORNING NUCLEAR CORPORATION SYLVANIA-CORNING NUCLEAR CORPORATION METALLURGICAL LABORATORY BAYSIDE, NEW YORK Work performed by the Health and Safety Research Division Oak Ridge National Laboratory Oak Ridge, Tennessee 37830 March 1980 OAK RIDGE NATIONAL LABORATORY operated by UNION CARBIDE CORPORATION for the DEPARTMENT OF ENERGY as part of the Formerly Utilized Sites-- Remedial Action Program SYLVANIA-CORNING NUCLEAR CORPORATION METALLURGICAL LABORATORY BAYSIDE, NEW YORK At the request of the Department of Energy (DOE), a preliminary survey was performed at the former Sylvania-Corning Nuclear Corporation in Bayside, New York (see Fig. l), on November 29, 1977, to assess the radiological status of those facilities uti 7 Commission (AEC) contract during the 1950s. _ _ ._. __

256

PRELIMINARY SURVEY OF BETHLEHEM STEEL LACKAWANNA, NEW YORK  

Office of Legacy Management (LM)

BETHLEHEM STEEL BETHLEHEM STEEL LACKAWANNA, NEW YORK Work oerformed bi the Health and Safety Research Division Oak Ridge National Laboratory Oak Ridge, Tennessee 37830 March 1980 OAK RIDGE NATIONAL LABORATORY operated by UNION CARBIDE CORPORATION for the DEPARTMENT OF ENERGY as part of the Formerly Utilized Sites-- Remedial Action Program BETHLEHEM STEEL LACKAWANNA, NEW YORK At the request of the Department of Energy (DOE, then ERDA), a preliminary survey was performed at the Bethlehem Steel Corporation's plant in Lackawanna, New York (see Fig. l), on August 26, 1976, to assess the radiological status of those facilities utilized under Atomic Energy Commission (AEC) contract during the period 1949 through 1951. Anthony LaMastra of Bethlehem Steel, who was in charge of radiation

257

Preliminary Notice of Violation EA 98-12  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mr. Peyton S. Baker Mr. Peyton S. Baker [ ] Babcock & Wilcox of Ohio, Inc. 1 Mound Road Miamisburg, Ohio 45343-3030 EA 98-12 Subject: Preliminary Notice of Violation and Proposed Imposition of Civil Penalty - $165,000 (NTS-OH-MB-BWO-BWO04-1998-0001, NTS-OH-MB-BWO-BWO04-1998-0002, and NTS-OH-MB-BWO-BWO06-1998-0001) Dear Mr. Baker: This letter refers to the Department of Energy's (DOE) investigation of the facts and circumstances concerning a number of significant deficiencies in Babcock & Wilcox of Ohio, Inc., (BWO) radiological work controls and bioassay program at the DOE Mound Site and its corrective actions to remedy those deficiencies. DOE initiated an investigation in March 1998 for the radiological work control deficiencies during the WD-Building filter change and in May 1998 for the bioassay

258

PRELIMINARY SURVEY OF W. R. GRACE COMPANY Ridgewood, Florida  

Office of Legacy Management (LM)

W. R. GRACE COMPANY W. R. GRACE COMPANY Ridgewood, Florida Work performed by the Health and Safety Research Division Oak Ridge National Laboratory Oak Ridge, Tennessee 37830 March 1980 OAK RIDGE NATIONAL LABORATORY operated by UNION CARBIDE CORPORATION for the DEPARTMENT OF ENERGY as part of the Formerly Utilized Sites-- Remedial Action Program W. R. GRACE COMPANY Ridgewood, Florida At the request of the Department of Energy (DOE, then ERDA), a preliminary survey was performed at the W. R. Grace and Company, Agricultural Chemicals Division plant in Ridgewood, Florida, on April 6, 1977, to assess the radiological status of those facilities utilized under an Atomic Energy Commission (AEC) raw materials contract during the period 7954 through 1955. Gene Terry, General Manager,

259

PRELIMINARY SURVEY OF OLIN MATHIESON CHEMICAL CORPORATION Pasadena, Texas  

Office of Legacy Management (LM)

OLIN MATHIESON CHEMICAL CORPORATION OLIN MATHIESON CHEMICAL CORPORATION Pasadena, Texas . Work performed by the Health and Safety Research Division Oak Ridge National Laboratory Oak Ridge, Tennessee 37830 March 1980 OAK RIDGE NATIONAL LABORATORY operated by UNION CARBIDE CORPORATION for the DEPARTMENT OF ENERGY as part of the Formerly Utilized Sites-- Remedial Action Program -- OLIN MATHIESON CHEMICAL CORPORATION Pasadena, Texas At the request of the Department of Energy (DOE), a preliminary survey was performed at the Olin Mathieson Chemical Corporation plant in Pasadena, Texas (see Fig. l), on November 18, 1977, to assess the radio- logical status of those facilities utilized under an Atomic Energy Commission raw materials contract for a period determined to be during the early 1950s. M. S. Davenport, Plant Manager, provided information

260

Preliminary Notice of Violation EA 97-03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Robert G. Card Robert G. Card [ ] Kaiser-Hill Company, L.L.C. Rocky Flats Environmental Technology Site P.O. Box 464 Golden, CO 80402-0464 EA 97-03 Subject: Preliminary Notice of Violation (NTS-RFO--KHLL-ENVOPS-1996-0001) Dear Mr. Card: This letter refers to the Department of Energy's (DOE) evaluation of noncompliances associated with an increasing trend in the number of criticality safety infractions and an unauthorized movement of six drums in a criticality infracted room of [building]. These issues were identified by your staff through self-assessment and timely awareness of management to the unauthorized movement. This letter also refers to an incident involving an unplanned dispersal of radioactive material during remediation of trenches [ ]. Noncompliance Tracking System (NTS) reports filed by you concerning the criticality

Note: This page contains sample records for the topic "risk-based preliminary remediation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

PRELIMINARY SURVEY OF ROHM AND HAAS COMPANY Philadelphia, Pennsylvania  

Office of Legacy Management (LM)

ROHM AND HAAS COMPANY ROHM AND HAAS COMPANY Philadelphia, Pennsylvania Work performed by the Health and Safety Research Division Oak Ridge National Laboratory Oak Ridge, Tennessee 37830 March 1980 OAK. RIDGE NATIONAL LABORATORY operated by UNION CARBIDE CORPORATION for the DEPARTMENT OF ENERGY as part of the Formerly Utilized Sites-- Remedial Action Program ." .".I_I----C_X_^-_.. -. --_ ROHM AND HAAS COMPANY Philadelphia, Pennsylvania At the request of the Department of Energy (DOE), a preliminary survey was performed at the Rohm and Haas Company plant in Philadelphia, Pennsylvania (see Fig. 1), on December 1, 1977, to assess the radio- logical status of those facilities utilized under Atomic Energy Commission (AEC) Contract AT(49-l)-535 (the contract was destroyed at some point

262

PRELIMINARY SURVEY OF BRIDGEPORT BRASS COMPANY SEYMOUR, CONNECTICUT  

Office of Legacy Management (LM)

BRIDGEPORT BRASS COMPANY BRIDGEPORT BRASS COMPANY SEYMOUR, CONNECTICUT Work performed by the Health and Safety Research Division Oak Ridge National Laboratory Oak Ridge, Tennessee 37830 March 1980 OAK RIDGE NATIONAL LABORATORY operated by UNION CARBIDE CORPORATION for the DEPARTMENT OF ENERGY as part of the Formerly Utilized Sites-- Remedial Action Program BRIDGEPORT BRASS COMPANY SEYMOUR, CONNECTICUT At the request of the Department of Energy (then ERDA), a preliminary survey was performed at the Bridgeport Brass Company in Seymour, Connecticut (Fig. 1) on January 26, 1977, to assess the radiological status of those facilities used under Atomic Energy Commission (AEC) contract during the period 1962 through 1964. Mr. Edwin F. Rich, Plant Engineer, provided information about the project and identified those

263

Preliminary Notice of Violation EA-2001-06  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4, 2002 4, 2002 Mr. Woodrow Jameson [ ] Fluor Fernald, Inc. P.O. Box 538704 Cincinnati, OH 45253-8704 EA-2001-06 Subject: Preliminary Notice of Violation and Proposed Imposition of Civil Penalty ($55,000) Dear Mr. Jameson: This letter refers to the Department of Energy's (DOE) evaluation of several problems and events occurring during calendar years 2000 and 2001 in association with the Waste Pits Remedial Action Project (WPRAP). In August 2000 your staff identified a problem with elevated airborne radioactivity levels at the WPRAP T321 trailer. This long-standing deficiency resulted in a significant number of workers receiving unplanned and unmonitored radiation exposures. DOE also evaluated deficiencies related to WPRAP operator training and qualification, and the performance of Conduct of Operations (ConOps) surveillances. These

264

Preliminary Notice of Violation EA 98-09  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ambrose L. Schwallie Ambrose L. Schwallie [ ] Westinghouse Savannah River Company Building 703-A P.O. Box 616 Aiken, SC 29802 EA 98-09 Subject: Preliminary Notice of Violation and Proposed Imposition of Civil Penalty - $75,000 (NTS-SR--WSRC-ESH-1997-0001) Dear Mr. Schwallie: This letter refers to the Department of Energy's (DOE) investigation of the facts and circumstances concerning deficiencies in Westinghouse Savannah River Company's (WSRC) bioassay participation requirements and WSRC's corrective actions to remedy those deficiencies. The Office of Enforcement and Investigation initiated an investigation of this event in April 1998. Based on a review of relevant facility documentation and discussions with WSRC and DOE's Savannah River Operations Office (DOE-SR) personnel during

265

PRELIMINARY SURVEY OF WESTINGHOUSE ELECTRIC CORPORATION EAST PITTSBURGH, PENNSYLVANIA  

Office of Legacy Management (LM)

WESTINGHOUSE ELECTRIC CORPORATION WESTINGHOUSE ELECTRIC CORPORATION EAST PITTSBURGH, PENNSYLVANIA Work performed by the Health and Safety Research Division Oak Ridge National Laboratory Oak Ridge, Tennessee 37830 March 1980 OAK RIDGE NATIONAL LABORATORY operated by UNION CARBIDE CORPORATION for the DEPARTMENT OF ENERGY as part of the Formerly Utilized Sites-- Remedial Action Program WESTINGHOUSE ELECTRIC CORPORATION EAST PITTSBURGH, PENNSYLVANIA At the request of the Department of Energy (DOE, then ERDA), a preliminary survey was performed at the Westinghouse Electric Corporation's East Pittsburgh Plant in East Pittsburgh, Pennsylvania (see Fig. l), on October 22, 1976, to assess the radiological status of those facilities utilized under AEC/MED contract during an early phase of the Manhattan

266

Phyto remediation groundwater trends at the DOE portsmouth gaseous  

SciTech Connect

This paper describes the progress of a phyto-remediation action being performed at the Department of Energy (DOE) Portsmouth Gaseous Diffusion Plant (PORTS) X-740 Waste Oil Handling Facility to remediate contaminated groundwater under a Resource Conservation and Recovery Act (RCRA) closure action. This action was effected by an Ohio Environmental Protection Agency (OEPA) decision to use phyto-remediation as the preferred remedy for the X-740 groundwater contamination. This remedy was recognized as a cost-effective, low-maintenance, and promising method to remediate groundwater contaminated with volatile organic compounds (VOCs), primarily trichloroethylene (TCE). During 1999, prior to the tree installation at the X-740 Phyto-remediation Area, water level measurements in the area were collected from 10 monitoring wells completed in the Gallia Formation. The Gallia is the uppermost water-bearing zone and contains most of the groundwater contamination at PORTS. During the tree installation which took place during the summer of 1999, four new Gallia monitoring wells were installed at the X-740 Area in addition to the 10 Gallia wells which had been installed in the same area during the early 1990's. Manual water level measurements were collected quarterly from these 14 Gallia monitoring wells between 1998 and 2001. These manual water level measurements were collected to monitor the combined impact of the trees on the groundwater prior to root development. Beginning in 2001, water level measurements were collected monthly during the growing season (April-September) and quarterly during the dormant season (October-March). A total of eight water level measurements were collected annually to monitor the phyto-remediation system's effect on the groundwater in the X- 740 Area. The primary function of the X-740 Phyto-remediation Area is to hydraulically prevent further spreading of the TCE plume. This process utilizes deep-rooted plants, such as poplar trees, to extract large quantities of water from the saturated zone. The focus of any phyto-remediation system is to develop a cone of depression under the entire plantation area. This cone of depression can halt migration of the contaminant plume and can create a hydraulic barrier, thereby maintaining plume capture. While a cone of depression is not yet evident at the X-740 Phyto-remediation Area, water level measurements in 2004 and 2005 differed from measurements taken in previous years, indicating that the now mature trees are influencing groundwater flow direction and gradient at the site. Water level measurements taken from 2003 through 2005 indicate a trend whereby groundwater elevations steadily decreased in the X-740 Phyto-remediation System. During this time, an average groundwater table drop of 0.30 feet was observed. Although the time for the phyto-remediation system to mature had been estimated at two to three years, these monitoring data indicate a period of four to five years for the trees to reach maturity. Although, these trends are not apparent from analysis of the potentiometric surface contours, it does appear that the head gradient across the site is higher during the spring and lower during the fall. It is not clear, however, whether this trend was initiated by the installation of the phyto-remediation system. This paper will present the groundwater data collected to date to illustrate the effects of the trees on the groundwater table. (authors)

Lewis, A.C.; Baird, D.R. [CDM, Piketon, OH (United States)

2007-07-01T23:59:59.000Z

267

Remediation of contaminated soils and sediments using Daramend bioremediation  

SciTech Connect

Soils and sediments containing polyaromatic hydrocarbons (PAH), petroleum hydrocarbons, heavy oils, chlorinated phenols, pesticides, herbicides and phthalates, either individually or in combination, have been difficult to remediate in the past. Not only the species of contaminant, but contaminant concentrations were roadblocks to successful use of bioremediation. Daramend{sup Tm} remediation has removed many of these obstacles through extensive research. Bench-scale, pilot-scale and full-scale demonstrations have been conducted at a variety of industrial sites. At a manufactured gas site, 295 days of Daramend remediation reduced concentrations of chrysene and fluoranthene from 38.9 mg/kg to 5.9 mg/kg and 84.6 mg/kg to 7.8 mg/kg respectively. Elsewhere, the total PAH concentration in a silty soil was reduced from 1,442 mg/kg to 36 mg/kg. Concentrations of even the most refractory PAHs (e.g. pyrene, benzo(a)pyrene) were reduced to below the established clean-up guidelines. Total petroleum hydrocarbons (diesel fuel) have also been reduced from 8,700 mg/kg to 34 mg/kg after 182 days of treatment. Similarly, in a clay soil contaminated by crude oil processing, the concentrations of high molecular weight aliphatic hydrocarbons were rapidly reduced (138 days) to below the remediation criteria. Demonstrations with wood treatment site soils have proven Daramend remediation effective in enhancing the target compound degradation rates. Soils containing 2170 mg PCP/kg were shown to contain only 11 mg PCP/kg after 280 days of Darmend remediation. The issue of toxicity of soil containing increased amounts of pentachlorophenols was solved. Performance data collected during these projects indicate that Daramend remediation provides a cost effective method for clean-up of soils and sediments containing a variety of organic compounds.

Burwell, S.W.; Bucens, P.G.; Seech, A.G.

1996-05-01T23:59:59.000Z

268

Chapter 28 - Nanotechnology for Contaminated Subsurface Remediation: Possibilities and Challenges  

Science Journals Connector (OSTI)

Groundwater represents a significant source of potable and industrial process water throughout the world. With population growth the availability of this precise resource is becoming increasingly scarce. Historically, the subsurface was thought to act as a natural filter of wastes injected into the ground. The potential for these wastes to persist in the subsurface for decades, potentially contaminating drinking water sources was ignored. Not only do toxic compounds have significant detrimental impacts on the environment and human health, there are also economic and social costs associated with contaminated groundwater. Due to increased demands on groundwater resources and historical contamination there is a need to remediate contaminated groundwater to meet current and future demands. At many hazardous sites, however, current remediation technologies routinely defy attempts at satisfactory restoration. As a result new, innovative remediation technologies are required. Nanomaterials are receiving widespread interest in a variety of fields due to their unique, beneficial chemical, physical, and mechanical properties. They have recently been proposed to address a number of environmental problems including the remediation of the contaminated subsurface. A wide variety of nanoparticles, such as metallic (e.g., zero valent iron or bimetallic nanoparticles) and carbon based nanoparticles (e.g., C60 nanoparticles) have been investigated to assess their potential for contaminated site remediation. Studies suggest that nanoparticles have the ability to convert or sequester a wide variety of subsurface contaminants (e.g., chlorinated solvents and heavy metals). In addition they are more reactive than similar, larger sized, reactive materials. The majority of these studies have, however, been conducted at the batch scale. Considerable work is necessary prior to the application of nanotechnology for contaminated site remediation. One problem, for example, is the delivery of reactive nanometals to the contaminated source zone where they will react. This chapter will summarize the use of nanoparticles for contaminated site remediation and highlight some of the challenges that remain unresolved.

Denis M. O’Carroll

2014-01-01T23:59:59.000Z

269

Preliminary Screening | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Preliminary Screening Preliminary Screening Preliminary Screening October 16, 2013 - 5:12pm Addthis The first step in assessing renewable energy options is to conduct a preliminary screening to decide which technologies are worth investigating and which can be eliminated immediately. Preliminary screening involves using resource maps and other basic tools to choose technologies to pursue further. This should occur in the planning phase and can be completed at the agency level with some simple training. There should be no need to hire an outside consultant at this stage. When narrowing technology options during this phase of assessment, a range of factors are considered, such as: Available Renewable Resources Ability to Connect to the Grid Available Renewable Resources Renewable energy resources refer to the amount of energy that can be

270

Radioactive Tank Waste Remediation Focus Area. Technology summary  

SciTech Connect

In February 1991, DOE`s Office of Technology Development created the Underground Storage Tank Integrated Demonstration (UST-ID), to develop technologies for tank remediation. Tank remediation across the DOE Complex has been driven by Federal Facility Compliance Agreements with individual sites. In 1994, the DOE Office of Environmental Management created the High Level Waste Tank Remediation Focus Area (TFA; of which UST-ID is now a part) to better integrate and coordinate tank waste remediation technology development efforts. The mission of both organizations is the same: to focus the development, testing, and evaluation of remediation technologies within a system architecture to characterize, retrieve, treat, concentrate, and dispose of radioactive waste stored in USTs at DOE facilities. The ultimate goal is to provide safe and cost-effective solutions that are acceptable to both the public and regulators. The TFA has focused on four DOE locations: the Hanford Site in Richland, Washington, the Idaho National Engineering Laboratory (INEL) near Idaho Falls, Idaho, the Oak Ridge Reservation in Oak Ridge, Tennessee, and the Savannah River Site (SRS) in Aiken, South Carolina.

NONE

1995-06-01T23:59:59.000Z

271

Remediation plan for fluorescent light fixtures containing polychlorinated biphenyls (PCBs)  

SciTech Connect

This report describes the remedial action to achieve compliance with 29 CFR 1910 Occupational Safety and Health Administration (OSHA) requirements of fluorescent light fixtures containing PCBs at K-25 site. This remedial action is called the Remediation Plan for Fluorescent Light Fixtures Containing PCBs at the K-25 Site (The Plan). The Plan specifically discusses (1) conditions of non-compliance, (2) alternative solutions, (3) recommended solution, (4) remediation plan costs, (5) corrective action, (6) disposal of PCB waste, (7) training, and (8) plan conclusions. The results from inspections by Energy Systems personnel in 2 buildings at K-25 site and statistical extension of this data to 91 selected buildings at the K-25 site indicates that there are approximately 28,000 fluorescent light fixtures containing 47,036 ballasts. Approximately 38,531 contain PCBs and 2,799 of the 38,531 ballasts are leaking PCBs. Review of reportable occurrences at K-25 for the 12 month period of September 1990 through August 1991 shows that Energy Systems personnel reported 69 ballasts leaking PCBs. Each leaking ballast is in non-compliance with 29 CFR 1910 - Table Z-1-A. The age of the K-25 facilities indicate a continued and potential increase in ballasts leaking PCBs. This report considers 4 alternative solutions for dealing with the ballasts leaking PCBs. The advantages and disadvantages of each alternative solution are discussed and ranked using cost of remediation, reduction of health risks, and compliance with OSHA as criteria.

NONE

1992-04-30T23:59:59.000Z

272

Used Fuel Disposition Campaign Preliminary Quality Assurance...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Preliminary Quality Assurance Implementation Plan Used Fuel Disposition Campaign Preliminary Quality Assurance Implementation Plan The primary objective of this report is to...

273

DOD - Preliminary Screening Tool | Open Energy Information  

Open Energy Info (EERE)

Screening Tool Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: DOD - Preliminary Screening Tool Abstract This webpage contains the DOD preliminary...

274

Preliminary Notice of Violation, Washington Group International...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- EA-2003-07 More Documents & Publications Preliminary Notice of Violation, RTS Wright Industries, LLC - EA-2003-08 Preliminary Notice of Violation, URS Global Management &...

275

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

itI.2 -2 itI.2 -2 FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT FOR THE FORMER BRUSH BERYLLIUM COMPANY CLEVELAND, OHIO Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects __I__,_-. - ---.. ____- .- CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES Pa e -5 2 2 2 4 4 4 ii ELIMINATION REPORT THE FORMER BRUSH BERYLLIUM COMPANY CLEVELAND, OHIO INTRODUCTION The Oepartment of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decorrnnissioning Projects (and/or predecessor agencies, offices and divisionsa has reviewed the past activities of the Manhattan Engineer

276

Geoengineering: Plan B Remedy for Global Warming Andrew A. Lacis  

NLE Websites -- All DOE Office Websites (Extended Search)

Geoengineering: Plan B Remedy for Global Warming Geoengineering: Plan B Remedy for Global Warming Andrew A. Lacis NASA Goddard Institute for Space Studies Accelerated melting of Greenland ice is a clear indication that consequences of global warming are real and impending. The underlying causes of global warming are well enough understood, but the necessary reduction of greenhouse gases to prevent irreversible climate change is unlikely to happen before the point of no return is reached. To reverse the impending sea level rise, geoengineering counter- measures may be required to counter the current global energy imbalance due to global warming. Of the many proposed remedies, deploying aerosols within the stratosphere offers realistic prospects. Sulfur injections in the lower stratosphere would have the cooling effect of naturally occurring volcanic aerosols. Soot at

277

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

fi.q 2, fi.q 2, I: * FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT FOR WESTINGHOUSE ATOMIC POWER DEVELOPMENT PLANT EAST PITTSBURGH PLANT FOREST HILLS PITTSBURGH, PENNSYLVANIA Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects INTRODUCTION BACKGROUND CONTENTS Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES Page 1 4 iii ELIMINATION REPORT WESTINGHOUSE ATOMIC POWER DEVELOPMENT PLANT EAST PITTSBURGH PLANT FOREST HILLS PITTSBURGH, PENNSYLVANIA INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decormnissioning Projects (and/or predecessor agencies, offices and

278

Northeast Site Area A NAPL Remediation Final Report.doc  

Office of Legacy Management (LM)

82-TAC 82-TAC U.S. Department of Energy Work Performed Under DOE Contract No. for the U.S. Department of Energy DE-AC13-02GJ79491 Approved for public release; distribution is unlimited. Pinellas Environmental Restoration Project Northeast Site Area A NAPL Remediation Final Report September 2003 N0065200 GJO- 2003- 482- TAC GJO- PIN 13.12.10 Pinellas Environmental Restoration Project Northeast Site Area A NAPL Remediation Final Report Young - Rainey STAR Center September 2003 Prepared by U.S. Department of Energy Grand Junction Office Grand Junction, Colorado Work Performed Under DOE Contract Number DE-AC13- 02GJ79491 Document Number N0065200 Contents DOE/Grand Junction Office Northeast Site Area A NAPL Remediation Final Report September 2003 Page iii

279

The mission of the Remediation of Mercury and Industrial  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Remediation of Mercury and Industrial Remediation of Mercury and Industrial Contaminants Applied Field Research Initiative is to control the flux of contaminants in soil and water environments for the purpose of protecting surface water, groundwater, and ecological receptors. For more information, contact: Eric Pierce Oak Ridge National Laboratory 1 Bethel Valley Road, MS 6038 Oak Ridge, TN 37831 pierceem@ornl.gov (865) 574-9968 Kurt Gerdes DOE-EM Office of Groundwater and Soil Remediation kurt.gerdes@em.doe.gov (301) 903-7289 Sediment Biota Groundwater Flow Fluctuating Water Table Hg in building structures and rubble Waterborne mercury (mercury being transported via water being released from the facilities to the creeks) Hg currently present in the creek and sediments along the base of the creek

280

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

-p,l-I -p,l-I . . FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT FOR MOBIL MINING AND MINERALS COMPANY (THE FORMER MATHIESON CHEMICAL COMPANY) PASADENA, TEXAS D Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES Page 1 2 2 2 3 3 4 ii --. ELIMINATION REPORT MOBIL MINING AND MINERALS COMPANY (THE FORMER MATHIESON CHEMICAL COMPANY) PASADENA, TEXAS INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decommissioning Projects (and/or predecessor offices and divisions),

Note: This page contains sample records for the topic "risk-based preliminary remediation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Review on electrical discharge plasma technology for wastewater remediation  

Science Journals Connector (OSTI)

Abstract As wastewater remediation becomes a global concern, the development of innovative advanced oxidation processes for wastewater treatment is still a major challenge. With regard to its fast removal rate and environmental compatibility, plasma technology is considered as a promising remediation technology for water remediation. The principles of electrical plasma with liquids for pollutant removal and the reactors of various electrical discharge types are outlined in this review. To improve energy efficiency, combination of plasma technology with catalysts has attracted significant attention. The present review is concerned about present understanding of the mechanisms involved in these combined processes. Further on, detailed discussions are given of the effects of various factors on the performance of pulsed electrical plasma technology in water treatment processes. Finally, special attention is paid to the future challenges of plasma technology utilized for industrial wastewater treatment.

Bo Jiang; Jingtang Zheng; Shi Qiu; Mingbo Wu; Qinhui Zhang; Zifeng Yan; Qingzhong Xue

2014-01-01T23:59:59.000Z

282

Linde FUSRAP Site Remediation: Engineering Challenges and Solutions of Remedial Activities on an Active Industrial Facility - 13506  

SciTech Connect

The Linde FUSRAP Site (Linde) is located in Tonawanda, New York at a major research and development facility for Praxair, Inc. (Praxair). Successful remediation activities at Linde combines meeting cleanup objectives of radiological contamination while minimizing impacts to Praxair business operations. The unique use of Praxair's property coupled with an array of active and abandoned utilities poses many engineering and operational challenges; each of which has been overcome during the remedial action at Linde. The U.S. Army Corps of Engineers - Buffalo District (USACE) and CABRERA SERVICES, INC. (CABRERA) have successfully faced engineering challenges such as relocation of an aboveground structure, structural protection of an active water line, and installation of active mechanical, electrical, and communication utilities to perform remediation. As remediation nears completion, continued success of engineering challenges is critical as remaining activities exist in the vicinity of infrastructure essential to business operations; an electrical substation and duct bank providing power throughout the Praxair facility. Emphasis on engineering and operations through final remediation and into site restoration will allow for the safe and successful completion of the project. (authors)

Beres, Christopher M.; Fort, E. Joseph [Cabrera Services, Inc., 473 Silver Lane, East Hartford, CT 06118 (United States)] [Cabrera Services, Inc., 473 Silver Lane, East Hartford, CT 06118 (United States); Boyle, James D. [United States Army Corps of Engineers - Buffalo, 1776 Niagara Street, Buffalo, NY 14207 (United States)] [United States Army Corps of Engineers - Buffalo, 1776 Niagara Street, Buffalo, NY 14207 (United States)

2013-07-01T23:59:59.000Z

283

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

,: /A (,) i_ - z ,: /A (,) i_ - z FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT FOR FORMERLY UTILIZED PORTIONS OF THE WATERTOWN ARSENAL WATERTOWN, MASSACHUSETTS Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decotwnissioning Projects CONTENTS INTRODUCTION BACKGROUND Site Function Radiological History and Status ELIMINATION ANALYSIS Findings and Recommendation 6 REFERENCES iii Page 1 1 1 3 4 7 "..*.w..,, -. ._ ..- ". --. AUTHORITY REVIEW WATERTOWN ARSENAL WATERTOWN, MASSACHUSETTS INTRODUCTION The purpose of this review is to present information pertaining to work performed under the sponsorship of the Atomic Energy Commission (AEC) Manhattan Engineer District (MED) and the facts and circum-

284

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

SENECA ARMY DEPOT SENECA ARMY DEPOT ROMULUS, NEW YORK Department of Energy Office of Nuclear Energy Office of Remedial Action and kaste Technology. Division of Facility and Site Decommissioning Projects INTRODUCTION t3ACKGROUND CONTENTS . -Page Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES 1 4 ii .___ -_-_..--. ._.".. ELIMINATION REPORT SENECA ARMY DEPOT ROMULUS, NEW YORK . INTRODUCTION The Department pf Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decommissioning Projects (and/or predecessor agencies, offices, and divisions) has reviewed the past activities of the Manhattan Engineer District (MED) at Seneca Army Depot, Romulus, hew York. Based on the

285

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

\ \ ,.-c , 2 2 a. . FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM . ELIMINATION REPORT FOR THE FORMER GENERAL SERVICES ADMINISTRATION 39TH STREET WAREHOUSE 1716 PERSHING ROAD CHICAGO, ILLINOIS SEP301985 Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects __--... -_ -._.-_- _"_-. .___.. -... .._ ..-. .-. ..--- . , ' , CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES iii 4 __-.I ._-----.- --- ELIMINATION REPORT FOR THE FORMER GENERAL SERVICES ADMINISTRATION 39TH STREET WAREHOUSE 1716 PERSHING ROAD CHICAGO, ILLINOIS INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office

286

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

CF INDUSTRIES, INC. CF INDUSTRIES, INC. ( THE FORMER INTERNATIONAL MI NERALS AND CHEMICAL CORPORATION) BARTON, FLORIDA Department of Energy Office of Nuclear Energy. Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects - - .._. ..--.. . . I."__ . - INTRODUCTION CONTENTS Page BACKGROUND Site Function Site Description Radiological. History and Status ELIMINATION ANALYSIS REFERENCES Summary of Findings ii 7 8 --..I--- - ..-___-_--.___-"-- -- ' . ELIMINATION REPORT CF INDUSTRIES, INC. (THE FORMER INTERNATIONAL MINERALS AND CHEMICAL CORPORATION) BARTOW, FLORIDA INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decommissioning Projects (and/or predecessor agencies, offices, and

287

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

ROHM & HAAS COMPANY ROHM & HAAS COMPANY PHILADELPHIA, PENNSYLYANIA Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects CONTENTS Page INTRODUCTIOk BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES 2 2 2 2 3 3 iii ELIMINATION REPORT ROHM & HAAS COMPANY PHILADELPHIA, PENNSYLVANXA INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decommissioning Projects (and/or predecessor offices and divisions) has reviewed the past activities of the Atomic Energy Commission (AEC) at the Rohm & Haas Company, Philadelphia, Pennsylvania. Based on a

288

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

BETHLEHEM STEEL CORPORATION BETHLEHEM STEEL CORPORATION LACKAWANNA, NEW YORK Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects P bl@ C.' , 1 & cr INTRODUCTION BACKGROUND CONTENTS Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES Page 1 5 iii ELIMINATION REPORT BETHLEHEM STEEL CORPORATION LACKAWANNA, NEW YORK INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decommissioning Projects (and/or predecessor agencies, offices and divisions), has reviewed the past activities of the Atomic Energy Commission (AEC) at the Bethlehem Steel Corporation, Lackawanna, New

289

Designation of Sites for Remedial Action - Metal Hydrides, Beverly,  

Office of Legacy Management (LM)

T: T: Designation of Sites for Remedial Action - Metal Hydrides, Beverly, MA; Bridgeport Brass, Adrian, MI and Seymour, Chicago, IL CT; National Guard Armory, 0: Joe LaGrone, Manager Oak Ridge Operations Office Based on the attached radiological survey data (Attachments 1 through 3) and an appropriate authority review, the following properties are being authorized for remedial action. It should be noted that the attached survey data are for designation purposes only and that Bechtel National, Inc. (BNI) should conduct appropriate comprehensive characterization studies to determine the extent'and magnitude of contamination on properties. Site Location Priority Former Bridgeport Brass Co. (General Motors) Adrian, MI Low Former Bridgeport Brass Co.

290

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

UNIVERSITY OF ARIZONA UNIVERSITY OF ARIZONA (U.S. BUREAU OF MINES) TUCSON, ARIZONA Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects -- --- .- _- --__ CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES ii - ,. -- Page 1 4 4 ..I___ - ~-___- ELIMINATION REPORT UNIVERSITY OF ARIZONA (U.S. BUREAU OF MINES) TUCSON, ARIZONA INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decommissioning Projects (and/or predecessor offices and divisions) has reviewed the past activities of the Atomic Energy Commission (AEC)

291

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

NATIONAL BUREAU OF STANDARDS BUILDINGS NATIONAL BUREAU OF STANDARDS BUILDINGS VAN NESS STREET WASHINGTON, D.C. Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects - __-~---- -._.. .._ .-. .- INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status CONTENTS ELIMINATION ANALYSIS REFERENCES ii Paqe 1 4 INiRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decommissioning Projects (and/or predecessor agencies, offices, and divisions) has reviewed the past activities conducted for the Atomic Energy Commission and the Manhattan Engineer District (MED) (DOE predecessors) at

292

Tank waste remediation system systems engineering management plan  

SciTech Connect

This Systems Engineering Management Plan (SEMP) describes the Tank Waste Remediation Systems (TWRS) implementation of U.S. Department of Energy (DOE) Systems Engineering (SE) policy provided in Tank Waste Remediation System Systems Engineering Management Policy, DOE/RL letter, 95-RTI-107, Oct. 31, 1995. This SEMP defines the products, process, organization, and procedures used by the TWRS Program to accomplish SE objectives. This TWRS SEMP is applicable to all aspects of the TWRS Program and will be used as the basis for tailoring SE to apply necessary concepts and principles to develop and mature the processes and physical systems necessary to achieve the desired end states of the program.

Peck, L.G.

1996-02-06T23:59:59.000Z

293

Duct Remediation Program: Material characterization and removal/handling  

SciTech Connect

Remediation efforts were successfully performed at Rocky Flats to locate, characterize, and remove plutonium holdup from process exhaust ducts. Non-Destructive Assay (NDA) techniques were used to determine holdup locations and quantities. Visual characterization using video probes helped determine the physical properties of the material, which were used for remediation planning. Assorted equipment types, such as vacuum systems, scoops, brushes, and a rotating removal system, were developed to remove specific material types. Personnel safety and material handling requirements were addressed throughout the project.

Beckman, T.d.; Davis, M.M.; Karas, T.M.

1992-11-01T23:59:59.000Z

294

Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites  

Energy.gov (U.S. Department of Energy (DOE))

This document summarizes radiological conditions at sites remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP) and transferred to the U.S. Department of Energy (DOE) for...

295

Integrated Remediation Process for a High Salinity Industrial Soil Sample Contaminated with Heavy Oil and Metals  

Science Journals Connector (OSTI)

A highly saline industrial soil sample contaminated with heavy oils and several heavy metals, was tested for remediation using NRC’s Solvent Extraction Soil Remediation (SESR) process. The sample was provided ...

Abdul Majid; Bryan D. Sparks

2002-01-01T23:59:59.000Z

296

E-Print Network 3.0 - animal-based folk remedies Sample Search...  

NLE Websites -- All DOE Office Websites (Extended Search)

2009 Determinants of the success of remedy offers W: www.uea.ac.ukccp T... : +44 (0)1603 593715 A: UEA, Norwich, NR4 7TJ Determinants of the success of remedy offers:...

297

In Situ Vitrification an Innovative Melting Technology for the Remediation of Contaminated Soil  

Science Journals Connector (OSTI)

The remediation of contaminated sites is an increasingly serious problem in industrialised countries. There is a growing need for efficient techniques for remedial actions, especially for on-site treatment of ...

Dipl.-Ing. Hans Joachim Hampel; V. F. Fitzpatrick

1988-01-01T23:59:59.000Z

298

Steam and ET-DSP Combined for DNAPL Remediation: Full-Scale Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Steam and ET-DSP Combined for DNAPL Remediation: Full-Scale Site Steam and ET-DSP Combined for DNAPL Remediation: Full-Scale Site Restoration at Young - Rainey STAR Center Steam and ET-DSP Combined for DNAPL Remediation: Full-Scale Site Restoration at Young - Rainey STAR Center Proceedings of the Fourth International Conference on Remediation of Chlorinated and Recalcitrant Compounds. May 2004, Monterey, California. Gorm Heron, Steven Carroll, Hank Sowers, Bruce McGee, Randall Juhlin, Joe Daniel, David S. Ingle Steam and ET-DSP Combined for DNAPL Remediation: Full-Scale Site Restoration at Young - Rainey STAR Center More Documents & Publications Successful Field-Scale In Situ Thermal NAPL Remediation at the Young - Rainey STAR Center Project Overview: Successful Field-Scale In Situ Thermal NAPL Remediation Nonaqueous-Phase Liquid Characterization and Post-Remediation Verification

299

Recommendation 170: Remedial Investigation/Feasibility Study for East Tennessee Technology Park  

Energy.gov (U.S. Department of Energy (DOE))

The ORSSAB Recommendation to DOE on a Remedial Investigation/Feasibility Study for East Tennessee Technology Park.

300

Overview of the U.S. Department of Energy Formerly Utilized Sites Remedial Action Program  

Energy.gov (U.S. Department of Energy (DOE))

Overview of the U.S. Department of Energy Formerly Utilized Sites Remedial Action Program (March 2012)

Note: This page contains sample records for the topic "risk-based preliminary remediation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Voluntary Protection Program Onsite Review, Soil and Groundwater Remediation Project- March 2007  

Energy.gov (U.S. Department of Energy (DOE))

Evaluation to determine whether Soil and Groundwater Remediation Project is performing at a level deserving DOE-VPP recognition.

302

Assessing and Implementing LTS&M Requirements for Remediation Sites Under the FUSRAP Program  

Energy.gov (U.S. Department of Energy (DOE))

Assessing and Implementing LTS&M Requirements for Remediation Sites Under the FUSRAP Program (Waste Management Conference 2007)

303

Description of the Formerly Utilized Sites Remedial Action Program  

SciTech Connect

The background and the results to date of the Department of Energy program to identify and evaluate the radiological conditions at sites formerly utilized by the Corps of Engineers' Manhattan Engineer District (MED) and the US Atomic Energy Commission (AEC) are summarized. The sites of concern were federally, privately, and institutionally owned and were used primarily for research, processing, and storage of uranium and thorium ores, concentrates, or residues. Some sites were subsequently released for other purposes without radiological restriction. Surveys have been conducted since 1974 to document radiological conditions at such sites. Based on radiological surveys, sites are identified in this document that require, or are projected to require, remedial action to remove potential restrictions on the use of the property due to the presence of residual low-level radioactive contamination. Specific recommendations for each site will result from more detailed environmental and engineering surveys to be conducted at those sites and, if necessary, an environmental impact assessment or environmental impact statement will be prepared. Section 3.0 describes the current standards and guidelines now being used to conduct remedial actions. Current authority of the US Department of Energy (DOE) to proceed with remedial actions and the new authority required are summarized. A plan to implement the Formerly Utilized Sites Remedial Action Program (FUSRAP) in accordance with the new authority is presented, including the objectives, scope, general approach, and a summary schedule. Key issues affecting schedule and cost are discussed.

Not Available

1980-09-01T23:59:59.000Z

304

A large scale environmental assessment: The Clinch River Remedial Investigation  

SciTech Connect

The USEPA identified the Department of Energy Oak Ridge Reservation (ORR) in east Tennessee as a Superfund National Priorities List site in 1989. Facilities at the ORR have released a variety of radiological, organic, and inorganic contaminants to the local aquatic environment as a result of nuclear weapons production, uranium enrichment, and energy research and development activities from the mid 1940s to the present. The Clinch River Remedial Investigation (CRRI) was initiated to meet the Resource Conservation Recovery Act (RCRA) and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements to determine the nature and extent of hazardous releases to the aquatic environment. Phase 1 of the CRRI consisted of sampling and analysis of selected sites representing differing levels of contamination to determine the range of contaminant concentrations present in off-site water, sediment, and fish. Sampling activities in support of Phase 2 of the remedial investigation were designed to assist in defining the nature and extent of the contaminants of concern in sediment, water and biota, and to provide information for assessing the potential risks to human health and the environment associated with those contaminants. A concurrent study evaluated potential remedial alternatives and identified effective and acceptable corrective measures. An overview of the CRRI, including a history of the facilities and their contaminant releases, and the regulatory context in which the remedial investigation occurred is presented.

LeHew, R.; Harris, R. [Oak Ridge National Lab., TN (United States)

1995-12-31T23:59:59.000Z

305

Adapting Advances in Remediation Science to Long-Term Surveillance  

SciTech Connect

Several facets of groundwater remediation stand to gain from the advances made during recent years in disciplines that contribute to remediation science. Engineered remedies designed to aggressively remove subsurface contamination should benefit from this progress, and more passive cleanup methods and the long-term monitoring of such passive approaches may benefit equally well if not more. The U.S. Department of Energy Office of Legacy Management (LM) has adopted a strategic plan that is designed to take advantage of technological improvements in the monitoring and assessment of both active and passive groundwater remedies. Flexible adaptation of new technologies, as they become available, to long-term surveillance at LM sites is expected to reduce site stewardship costs while ensuring the future protection of human health and the environment. Some of the technologies are expected to come from government initiatives that focus on the needs of subsurface monitoring. Additional progress in monitoring science will likely result from continual improvements in our understanding of contaminant fate-and-transport processes in the groundwater and the vadose zone.

Peterson, Dave [S.M. Stoller Corporation

2006-03-01T23:59:59.000Z

306

FY-95 technology catalog. Technology development for buried waste remediation  

SciTech Connect

The US Department of Energy`s (DOE) Buried Waste Integrated Demonstration (BWID) program, which is now part of the Landfill Stabilization Focus Area (LSFA), supports applied research, development, demonstration, and evaluation of a multitude of advanced technologies dealing with underground radioactive and hazardous waste remediation. These innovative technologies are being developed as part of integrated comprehensive remediation systems for the effective and efficient remediation of buried waste sites throughout the DOE complex. These efforts are identified and coordinated in support of Environmental Restoration (EM-40) and Waste Management (EM-30) needs and objectives. Sponsored by the DOE Office of Technology Development (EM-50), BWID and LSFA work with universities and private industry to develop technologies that are being transferred to the private sector for use nationally and internationally. This report contains the details of the purpose, logic, and methodology used to develop and demonstrate DOE buried waste remediation technologies. It also provides a catalog of technologies and capabilities with development status for potential users. Past FY-92 through FY-94 technology testing, field trials, and demonstrations are summarized. Continuing and new FY-95 technology demonstrations also are described.

NONE

1995-10-01T23:59:59.000Z

307

In-situ remediation system for groundwater and soils  

DOE Patents (OSTI)

The present invention relates to a system for in-situ remediation of contaminated groundwater and soil. In particular the present invention relates to stabilizing toxic metals in groundwater and soil. The United States Government has rights in this invention pursuant to Contract No. DE-AC09-89SR18035 between the US Department of Energy and Westinghouse Savannah River Company.

Corey, J.C.; Kaback, D.S.; Looney, B.B.

1991-01-01T23:59:59.000Z

308

Managing Complex Environmental Remediation amidst Aggressive Facility Revitalization Milestones  

SciTech Connect

Unlike the final closure projects at Rocky Flats and Fernald, many of the Department of Energy's future CERCLA and RCRA closure challenges will take place at active facilities, such as the Oak Ridge National Laboratory (ORNL) central campus. ORNL has aggressive growth plans for a Research Technology Park and cleanup must address and integrate D and D, soil and groundwater remediation, and on-going and future business plans for the Park. Different planning and tracking tools are needed to support closures at active facilities. To support some large Airport redevelopment efforts, we created tools that allowed the Airline lease-holder to perform environmental remediation on the same schedule as building D and D and new building construction, which in turn allowed them to migrate real estate from unusable to usable within an aggressive schedule. In summary: The FIM and OpenGate{sup TM} spatial analysis system were two primary tools developed to support simultaneous environmental remediation, D and D, and construction efforts at an operating facility. These tools helped redevelopers to deal with environmental remediation on the same schedule as building D and D and construction, thereby meeting their goals of opening gates, restarting their revenue streams, at the same time complying with all environmental regulations. (authors)

Richter Pack, S. [PMP Science Applications International Corporation, Oak Ridge, TN (United States)

2008-07-01T23:59:59.000Z

309

In-Situ Thermal Remediation of Contaminated Soil1  

E-Print Network (OSTI)

differentials at the electrodes. Water is also pumped into the soil via the injection well and out of the groundChapter 1 In-Situ Thermal Remediation of Contaminated Soil1 Written by Huaxiong Huang,2 Serguei meters under the ground) has been proposed by McMillan-McGee Corp. The process can be described

Lapin, Sergey

310

Remediation of arsenic-contaminated soils and groundwaters  

DOE Patents (OSTI)

An in situ method is described for extraction of arsenic contaminants from a soil medium and remediation of the medium including contacting the medium with an extractant solution, directing the solution within and through the medium, and collecting the solution and contaminants. The method can also be used for arsenate and/or arsenite removal. 8 figs.

Peters, R.W.; Frank, J.R.; Feng, X.

1998-06-23T23:59:59.000Z

311

Application of groundwater modeling in remedial action development  

Science Journals Connector (OSTI)

The development and implementation of a remedial program usually is a costly process. Available scientific and engineering data should be used to optimize the investigation program which will lead to the development of a cost-effective remedial action. As part of the scope of the Remedial Investigation (RI), the data needs and significance of the key parameters as related to the final remedial design should be assessed and determined to obtain necessary data in a timely and cost-effective manner. Properly verified groundwater computer models are powerful tools for both identifying data gaps which must be filled before an appropriate design can be prepared and for assessing the significance of site features on the problem and solution. These models can be used effectively during both the RI and Feasibility Study (FS) phases. In the RI phase, the models can be used for optimization of field and laboratory testing programs and in data analysis to assess adequateness of the field investigation and provide basic data for

Sirous H. Djafari; David E. Troxell

1990-01-01T23:59:59.000Z

312

Savannah River Remediation, College Create Job Opportunities for Graduates  

Energy.gov (U.S. Department of Energy (DOE))

AIKEN, S.C. – Savannah River Remediation (SRR), the liquid waste contractor for the EM program at the Savannah River Site (SRS), requires workers with unique skills to protect employees from radiation as the company works safely toward completing its mission.

313

Remedial action work plan for the Colonie site. Revision 1  

SciTech Connect

The Colonie site is a DOE Formerly Utilized Sites Remedial Action Program (FUSRAP) site located in the Town of Colonie, New York, and consisting of an interim storage site and several vicinity properties. The Colonie Interim Storage Site (CISS) is the former National Lead (NL) Industries plant located at 1130 Central Avenue. There are 11 vicinity properties that received remedial action in 1984: 7 located south of the site on Yardboro and Palmer Avenues just across the Colonie-Albany town limits in Albany, and 4 located northwest of the site along Central Avenue in Colonie. Of these properties, nine are residences and two are commercial properties. This document describes the engineering design, construction, and associated plans for remedial action on the vicinity properties and the interim storage site. These plans include both radiological and chemical work. Radiological work includes: excavating the above-guideline radioactive wastes on the vicinity properties; designing required facilities for the interim storage site; preparing the interim storage site to receive these contaminated materials; transporting the contaminated materials to the interim waste storage stockpile; and preparing necessary schedules for accomplishing the remedial actions. Chemical work involves: developing the Resource Conservation and Recovery Act (RCRA) closure plans; neutralizing chemical hazards associated with plating solutions; inventorying on-site chemicals; and disposal of chemicals and/or residues. 17 refs., 5 figs., 1 tab.

Not Available

1985-08-01T23:59:59.000Z

314

In situ Remediation Technologies Associated with Sanitation Improvement  

E-Print Network (OSTI)

by poor levels of sanitation and inadequate water and wastewater management. Pressure from urban areas12 In situ Remediation Technologies Associated with Sanitation Improvement: An Opportunity, the implementation of sanitation infrastructure is also necessary. With the increase of the negative environmental

Paris-Sud XI, Université de

315

Preliminary Notice of Violation, Fluor Fernald, Inc - EA-2001-06 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Inc - EA-2001-06 Inc - EA-2001-06 Preliminary Notice of Violation, Fluor Fernald, Inc - EA-2001-06 January 4, 2002 Preliminary Notice of Violation issued to Fluor Fernald, Inc., related to Unplanned Radiation Exposures and Quality Improvement Deficiencies at the Fernald Environmental Management Project, EA-2001-06 This letter refers to the Department of Energy's (DOE) evaluation of several problems and events occurring during calendar years 2000 and 2001 in association with the Waste Pits Remedial Action Project (WPRAP). In August 2000 your staff identified a problem with elevated airborne radioactivity levels at the WPRAP T321 trailer. This long-standing deficiency resulted in a significant number of workers receiving unplanned and unmonitored radiation exposures. DOE also evaluated deficiencies related to WPRAP operator training and

316

Preliminary Notice of Violation, Fluor Fernald, Inc - EA-2001-06 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fluor Fernald, Inc - EA-2001-06 Fluor Fernald, Inc - EA-2001-06 Preliminary Notice of Violation, Fluor Fernald, Inc - EA-2001-06 January 4, 2002 Preliminary Notice of Violation issued to Fluor Fernald, Inc., related to Unplanned Radiation Exposures and Quality Improvement Deficiencies at the Fernald Environmental Management Project, EA-2001-06 This letter refers to the Department of Energy's (DOE) evaluation of several problems and events occurring during calendar years 2000 and 2001 in association with the Waste Pits Remedial Action Project (WPRAP). In August 2000 your staff identified a problem with elevated airborne radioactivity levels at the WPRAP T321 trailer. This long-standing deficiency resulted in a significant number of workers receiving unplanned and unmonitored radiation exposures.

317

PRELIMINARY SURVEY OF THE UNION CARBIDE CORPORATION METALS DIVISION PLANT, NIAGARA FALLS, NEW YORK  

Office of Legacy Management (LM)

e e - .' N"lr 7% PRELIMINARY SURVEY OF THE UNION CARBIDE CORPORATION METALS DIVISION PLANT, NIAGARA FALLS, NEW YORK Work performed by the Health and Safety Research Division Oak Ridge Natjonal Laboratory Oak Ridge, Tennessee 37830 December 1980 OAK RIDGE NATIONAL LABORATORY operated by UNION CARBIDE CORPORATION for the DEPARTMENT OF ENERGY as part of the Formerly Utilized Sites-- Remedial Action Program PRELIMINARY SURVEY OF THE UNION CARBIDE CORPORATION METALS DIVISION PLANT, NIAGARA FALLS, NEW YORK B. A. Berven and R. W. Doane Introduction On September 2;, 1980, two representatives from Oak Ridge National Laboratory visited Union Carbide Corporation's Metal Division Plant (UCC-MD) in Niagara Falls, New York. The purpose of the visit was to

318

PRELIMINARY SURVEY OF AL-TECH SPECIALTY STEEL CORPORATION WATERVLIET, NEW YORK  

Office of Legacy Management (LM)

. . PRELIMINARY SURVEY OF AL-TECH SPECIALTY STEEL CORPORATION WATERVLIET, NEW YORK Work performed by the Health and Safety Research Division 3ak Ridge Natior!+l Laboratory Oak Ridge, Tennessee 37830 March 1980 OAK RIDGE NATIONAL LABORATORY operated by lJNIuN CARBIDE CORPORATIOi; for the DEPARTMEI?T OF EI4ERGY as part of the Formerly Utilized Sites-- Remedial Action Program --, . -. I .__ . . __ .*l-..l- __. ..-_.-- - - _- - .-- AL-TECH SPECIALTY STEEL CORPORATION WATERVLIET, NEW YORK At the request of the' Department of Energy (DOE, then ERDA), a preliminary survey was performed at the Al-Tech Specialty Steel Corporation plant in Watervliet, New York (see Fig. 1), on August 19, 1976, to assess the radiological status of those facilities utilized in Atomic

319

Remediation of Petroleum-Contaminated Groundwater Using High Carbon Content Fly Ash  

E-Print Network (OSTI)

1 Remediation of Petroleum-Contaminated Groundwater Using High Carbon Content Fly Ash M. Melih for retardation of petroleum contaminants in barrier applications. Sorbed amounts measured in batch scale tests on remediation efficiency. INTRODUCTION Remediation of groundwater contaminated with petroleum-based products has

Aydilek, Ahmet

320

CSMRI Site Remediation Quality Assurance Project Plan March 30, 2004 TABLE OF CONTENTS  

E-Print Network (OSTI)

..........................................................................................................................................5 9.0 Ground- and Surface-Water MonitoringCSMRI Site Remediation Quality Assurance Project Plan March 30, 2004 TASK PLAN TABLE OF CONTENTS 1 .............................................................................................5 FIGURES #12;CSMRI Site Remediation Task Plan March 31, 2004 TASK PLAN CSMRI SITE REMEDIATION 1

Note: This page contains sample records for the topic "risk-based preliminary remediation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

A Hydraulic Capture Application for Optimal Remediation Design K. R. Fowlera  

E-Print Network (OSTI)

. INTRODUCTION Hydraulic capture methods for remediation attempt to control the direction of ground- water1 A Hydraulic Capture Application for Optimal Remediation Design K. R. Fowlera , C. T. Kelley b , C Carolina Chapel Hill, NC 27599-7400, USA The goal of a hydraulic capture model for remediation purposes

322

Final Hazard Categorization for the Remediation of the 116-C-3 Chemical Waste Tanks  

SciTech Connect

This final hazard categorization (FHC) document examines the hazards, identifies appropriate controls to manage the hazards, and documents the commitments for the 116-C-3 Chemical Waste Tanks Remediation Project. The remediation activities analyzed in this FHC are based on recommended treatment and disposal alternatives described in the Engineering Evaluation for the Remediation to the 116-C-3 Chemical Waste Tanks (BHI 2005e).

T. M. Blakley; W. D. Schofield

2007-09-10T23:59:59.000Z

323

Minnesota Pollution Control Agency Public Meeting -5/19/2011 Remedial Investigation of UMore Park East  

E-Print Network (OSTI)

Minnesota Pollution Control Agency Public Meeting - 5/19/2011 Remedial Investigation of UMore Park MINNESOTA POLLUTION CONTROL AGENCY University of Minnesota Remedial Investigation of UMore Park East Dakota Public Meeting - 5/19/2011 Remedial Investigation of UMore Park East (763) 591-0535 or (800) 591

Netoff, Theoden

324

Relationship Between Solute Permeability and Osmotic Remediability in a Galactose-Negative Strain of Saccharomyces cerevisiae  

Science Journals Connector (OSTI)

...workers defined an osmotic remedial mutant as one in which the...inorganic, are effective osmotic remedial agents. The results reported here are a continuation of an investigation into the genetic and physiological...galactose-negative, osmotic remedial mutant. In S. cerevisiae...

John Bassel; Howard C. Douglas

1970-11-01T23:59:59.000Z

325

Community Involvement Plan: Remedial Investigation of UMore Park East, Dakota County, Minnesota  

E-Print Network (OSTI)

i Community Involvement Plan: Remedial Investigation of UMore Park East, Dakota County, Minnesota Appendix A Fact Sheet on Planned Remedial Investigation of UMore Park East UMP012331 #12;1 1.0 Overview participation in the planned Remedial Investigation (RI) of the eastern portion of the University of Minnesota

Netoff, Theoden

326

Osmotic Remedial Response in a Galactose-negative Mutant of Saccharomyces cerevisiae  

Science Journals Connector (OSTI)

...proposed that an osmotic remedial allele produces an...The object of this investigation was to examine the...particular osmotic remedial mutant in some detail...possibility that the osmotic remedial response affects trans...is currently under investigation. ACKNOWLEDGMENTS This...

John Bassel; H. C. Douglas

1968-03-01T23:59:59.000Z

327

The prevalence of folate-remedial MTHFR enzyme variants in humans  

Science Journals Connector (OSTI)

...The hypothesis that folate-remedial alleles of MTHFR are those...response that is currently under investigation. In this way the activity...function and would be nutrient remedial. The contribution from common...The prevalence of folate-remedial MTHFR enzyme variants in humans...

Nicholas J. Marini; Jennifer Gin; Janet Ziegle; Kathryn Hunkapiller Keho; David Ginzinger; Dennis A. Gilbert; Jasper Rine

2008-01-01T23:59:59.000Z

328

Guide to ground water remediation at CERCLA response action and RCRA corrective action sites  

SciTech Connect

This Guide contains the regulatory and policy requirements governing remediation of ground water contaminated with hazardous waste [including radioactive mixed waste (RMW)], hazardous substances, or pollutants/contaminants that present (or may present) an imminent and substantial danger. It was prepared by the Office of Environmental Policy and Assistance, RCRA/CERCLA Division (EH-413), to assist Environmental Program Managers (ERPMs) who often encounter contaminated ground water during the performance of either response actions under CERCLA or corrective actions under Subtitle C of RCRA. The Guide begins with coverage of the regulatory and technical issues that are encountered by ERPM`s after a CERCLA Preliminary Assessment/Site Investigation (PA/SI) or the RCRA Facility Assessment (RFA) have been completed and releases into the environment have been confirmed. It is based on the assumption that ground water contamination is present at the site, operable unit, solid waste management unit, or facility. The Guide`s scope concludes with completion of the final RAs/corrective measures and a determination by the appropriate regulatory agencies that no further response action is necessary.

NONE

1995-10-01T23:59:59.000Z

329

Evaluation of remedial alternatives for the Solar Ponds Plume, Rocky Flats Environmental Technology Site  

SciTech Connect

This paper describes the process used to select a remedial alternative for handling contaminated groundwater emanating from the Solar Evaporation Ponds (Solar Ponds) at the Rocky Flats Environmental Technology Site (RFETS) and prevent it from reaching the nearest surface water body, North Walnut Creek. Preliminary results of field investigations conducted to provide additional information for the alternatives analysis are also presented. The contaminated groundwater is referred to as the Solar Ponds Plume (SPP). The primary contaminants in the SPP are nitrate and uranium; however, some metals exceed the site action levels at several locations and volatile organic compounds, originating from other sources, also have been detected. Currently the SPP, local surface water runoff, and infiltrated precipitation are collected by a trench system located downgradient of the Solar Ponds and pumped to three storage tanks. The water (two to three million gallons annually) is then pumped to an on-site treatment plant for evaporation at an approximate cost of $7.57 per liter.

Hranac, K.C. [Morrison Knudsen Corp., Golden, CO (United States). Rocky Flats Environmental Technology Site; Chromec, F.W.; Fiehweg, R. [Rocky Mountain Remediation Services, Golden, CO (United States). Rocky Flats Environmental Technology Site; Hopkins, J. [Rocky Mountain Remediation Services, Los Alamos, NM (United States)

1998-07-01T23:59:59.000Z

330

Bioremediation in oil-contaminated sites: Bacteria and surfactant accelerated remediation  

SciTech Connect

In Mexico, there are several environmental issues which are being addressed under the current governmental legislation. One of the important issues is restoring sites belonging to Petroleos Mexicanos (PEMEX). PEMEX is a large government owned oil company that regulates and manages the oil reserves. These sites are primarily contaminated with weathered hydrocarbons which are a consequence of extracting millions of barrels of oil. Within the southern regions of Mexico there are sites which were contaminated by activities and spills that have occurred during the past 30 years. PEMEX has taken the leadership in correcting environmental problems and is very concerned about cleaning up the contaminated sites as quickly as possible. The most significant contaminated sites are located to the north of Veracruz and south of Tabasco. These site areas are close to refineries or locations of oil exploration. The primary category of contaminants are hydrocarbons, among them asphaltenes, aromatic and other contaminants. The concentration of the contaminants varies depending on the location of the sites, but it can reach as high as 500,000 ppm. PEMEX has been searching for appropriate, and cost-effective technologies to clean up these sites. Biologically based remediation activities are of primary interest to PEMEX. However, other treatment technologies such as chemical-physical methods, encapsulation and incineration are also being considered. The present report summarizes preliminary experiments that measured the feasibility of bioremediation for a contaminated site in southern Mexico.

Strong-Gunderson, J.M. [Oak Ridge National Lab., TN (United States). Environmental Sciences Div.; Guzman, F. [Inst. Mexicano del Petroleo, Mexico City (Mexico)

1996-12-31T23:59:59.000Z

331

Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase IV  

SciTech Connect

This Phase IV Remedial Design/Remedial Action Work Plan addresses the remediation of areas with the potential for UXO at the Idaho National Laboratory. These areas include portions of the Naval Proving Ground, the Arco High-Altitude Bombing Range, and the Twin Buttes Bombing Range. Five areas within the Naval Proving Ground that are known to contain UXO include the Naval Ordnance Disposal Area, the Mass Detonation Area, the Experimental Field Station, The Rail Car Explosion Area, and the Land Mine Fuze Burn Area. The Phase IV remedial action will be concentrated in these five areas. For other areas, such as the Arco High-Altitude Bombing Range and the Twin Buttes Bombing Range, ordnance has largely consisted of sand-filled practice bombs that do not pose an explosion risk. Ordnance encountered in these areas will be addressed under the Phase I Operations and Maintenance Plan that allows for the recovery and disposal of ordnance that poses an imminent risk to human health or the environment.

R. P. Wells

2006-11-14T23:59:59.000Z

332

Savannah River Remediation Donates $10,000 to South Carolina State Nuclear  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Remediation Donates $10,000 to South Carolina State Savannah River Remediation Donates $10,000 to South Carolina State Nuclear Engineering Program Savannah River Remediation Donates $10,000 to South Carolina State Nuclear Engineering Program September 28, 2012 - 9:27am Addthis Savannah River Remediation presents a $10,000 to South Carolina State University to support its Nuclear Engineering Program. In the photo, from left: Kayla Miller, Savannah River Remediation Procurement Department and South Carolina State University 2010 graduate; Dr. John Corbitt, Acting Chairman of the South Carolina State University Board of Trustees; Dr. Cynthia Warrick, Interim South Carolina State University President; and Dave Olson, Savannah River Remediation President and Project Manager. Savannah River Remediation presents a $10,000 to South Carolina State

333

The U.S. Department of Energy Formerly Utilized Sites Remedial Action  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The U.S. Department of Energy Formerly Utilized Sites Remedial The U.S. Department of Energy Formerly Utilized Sites Remedial Action Program: Ensuring Protectiveness and Preserving Knowledge The U.S. Department of Energy Formerly Utilized Sites Remedial Action Program: Ensuring Protectiveness and Preserving Knowledge The U.S. Department of Energy Formerly Utilized Sites Remedial Action Program: Ensuring Protectiveness and Preserving Knowledge (Waste Management Conference 2010) The U.S. Department of Energy Formerly Utilized Sites Remedial Action Program: Ensuring Protectiveness and Preserving Knowledge More Documents & Publications Implementation of the Formerly Utilized Sites Remedial Action Program: Coordination Between the U.S. Department of Energy and the U.S. Army Corps of Engineers Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP

334

Preliminary Process and Market Evaluation  

NLE Websites -- All DOE Office Websites (Extended Search)

- February 13, 2013 - February 13, 2013 BBNP Preliminary Process & Market Study ? LBNL Project Manager: Ed Vine DOE Project Manager: Jeff Dowd Project Team: Research Into Action, Inc., NMR Group, Evergreen Economic Consulting, and Nexant, Inc. Page 2 - February 13, 2013 BBNP Preliminary Process & Market Study ? Who we are We are a team of evaluators... independent of the BBNP program with whom DOE has contracted to assess the performance of BBNP and identify lessons learned We are: Research Into Action, NMR Group, Nexant, and Evergreen Economics Page 3 - February 13, 2013 BBNP Preliminary Process & Market Study ? What we are doing, what we hope to learn We are assessing the national BBNP program, not individual grantees or their programs

335

Applicable or Relevant and Appropriate Requirements (ARARs) for Remedial Action at the Oak Ridge Reservation: A compendium of major environmental laws. Environmental Restoration Program  

SciTech Connect

Section 121 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 specifies that remedial actions for cleanup of hazardous substances must comply with applicable or relevant and appropriate requirements (ARARS) or standards under federal and state environmental laws. The US Department of Energy (DOE) Oak Ridge Reservation (ORR) was placed on the National Priorities List by the US Environmental Protection Agency (EPA) on November 21, 1989, effective December 21, 1989. As a result of this listing, DOE, EPA, and the Tennessee Department of Environment and Conservation have signed a Federal Facility Agreement (FFA) for the environmental restoration of the ORR. Section XXI(F) of the FFA calls for the preparation of a draft listing of all ARARs as mandated by CERCLA {section}121. This report supplies a preliminary list of available federal and state ARARs that might be considered for remedial response at the ORR. A description of the terms ``applicable`` and ``relevant and appropriate`` is provided, as well as definitions of chemical-, location-, and action-specific ARARS. ARARs promulgated by the federal government and by the state of Tennessee are listed in tables. In addition, the major provisions of the Resource Conservation and Recovery Act, the Safe Drinking Water Act, the Clean Water Act, the Clean Air and other acts, as they apply to hazardous waste cleanup, are discussed. In the absence of ARARS, CERCLA {section}121 provides for the use of nonpromulgated federal criteria, guidelines, and advisories in evaluating the human risk associated with remedial action alternatives. Such nonpromulgated standards are classified as ``to-be-considered`` (TBC) guidance. A ion of available guidance is given; summary tables fist the available federal standards and guidance information. In addition, the substantive contents of the DOE orders as they apply to remediation of radioactively contaminated sites are discussed as TBC guidance.

Etnier, E.L.; McDonald, E.P.; Houlberg, L.M.

1993-07-01T23:59:59.000Z

336

Feasibility study for remedial action for the groundwater operable units at the chemical plant area and the ordnance works area, Weldon Spring, Missouri  

SciTech Connect

The U.S. Department of Energy (DOE) and the U.S. Department of Army (DA) are conducting an evaluation to identify the appropriate response action to address groundwater contamination at the Weldon Spring Chemical Plant (WSCP) and the Weldon Spring Ordnance Works (WSOW), respectively. The two areas are located in St. Charles County, about 48 km (30 rni) west of St. Louis. The groundwater operable unit (GWOU) at the WSCP is one of four operable units being evaluated by DOE as part of the Weldon Spring Site Remedial Action Project (WSSRAP). The groundwater operable unit at the WSOW is being evaluated by the DA as Operable Unit 2 (OU2); soil and pipeline contamination are being managed under Operable Unit 1 (OU1). Remedial activities at the WSCP and the WSOW are being conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Consistent with DOE policy, National Environmental Policy Act (NEPA) values have been incorporated into the CERCLA process. A remedial investigation/feasibility study (RI/FS) work plan summarizing initial site conditions and providing site hydrogeological and exposure models was published in August of 1995 (DOE 1995). The remedial investigation (RI) and baseline risk assessment (BRA) have also recently been completed. The RI (DOE and DA 1998b) discusses in detail the nature, extent, fate, and transport of groundwater and spring water contamination. The BRA (DOE and DA 1998a) is a combined baseline assessment of potential human health and ecological impacts and provides the estimated potential health risks and ecological impacts associated with groundwater and springwater contamination if no remedial action were taken. This feasibility study (FS) has been prepared to evaluate potential options for addressing groundwater contamination at the WSCP and the WSOW. A brief description of the history and environmental setting of the sites is presented in Section 1.1, key information relative to the nature and extent of contamination is presented in Section 1.2, and the results of the BRA are summarized in Section 1.3. The objective of this FS is discussed in Section 1.4, and preliminary remediation goals are identified in Section 1.5. The organization of the remaining chapters of this FS is outlined in Section 1.6.

NONE

1999-07-15T23:59:59.000Z

337

ENVIRONMENTAL ASSESSMENT OF No REMEDIAL ACTION AT THE INACTIVE URANIFEROUS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 206 7 206 REV. 0 ENVIRONMENTAL ASSESSMENT OF No REMEDIAL ACTION AT THE INACTIVE URANIFEROUS LIGNITE ASHING SITES AT BELFIELD AND BOWMAN. NORTH DAKOTA United States Department of Energy Uranium Mill Tailings Remedial Action Project June 1997 INTENDED FOR PUBLIC RELEASE This report has been reproduced from the best available copy. Available in paper copy and microfiche Number of pages in this report: 5 8 DOE and DOE contractors can obtain copies of this report from: Office of Scientific and Technical Information P.O. Box 62 Oak Ridge, TN 37831 (61 5) 576-8401 This report is publicly available from: National Technical Information Service Department of Commerce 5285 Port Royai Road Springfield, VA 22161 (703) 487-4650 DOE/EA-1206 REV. 0 ENVIRONMENTAL ASSESSMENT

338

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIkNATION REPORT  

Office of Legacy Management (LM)

ELIkNATION REPORT ELIkNATION REPORT .FOR WESTINGHOUSE .ATOMIC POWER DEVELOPMENT PLANT EAST PITTSBURGH PLANT FOREST HILLS PITTSBURGH, PENNSYLVANIA Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Deconrmissioning Projects l CONTENTS INTRODUCTICIN BACKGROUND. Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES Page 1 2 2 2' 4 4 iii ELIMINATION~REPORT WESTINGHOUSE ATOMIC POWER,DEVELOPMENT,PLANT: EAST PITTSBURGH PLANT: 'FOREST HILLS ,PITTS.BURGH, PENNSYLVANIA INTRODUCTION The Department of,Energy (DOE), Office of Nuclear Energy, Office of 'Remedial Action and Waste Technology, Division of Facility and Site Decommissioning Projects (and/or predecessor agencies, offices and

339

In Situ Biological Uranium Remediation within a Highly Contaminated Aquifer  

NLE Websites -- All DOE Office Websites (Extended Search)

In Situ Biological Uranium Remediation In Situ Biological Uranium Remediation within a Highly Contaminated Aquifer Matthew Ginder-Vogel1, Wei-Min Wu1, Jack Carley2, Phillip Jardine2, Scott Fendorf1 and Craig Criddle1 1Stanford University, Stanford, CA 2Oak Ridge National Laboratory, Oak Ridge, TN Microbial Respiration Figure 1. Uranium(VI) reduction is driven by microbial respiration resulting in the precipitation of uraninite. Uranium contamination of ground and surface waters has been detected at numerous sites throughout the world, including agricultural evaporation ponds (1), U.S. Department of Energy nuclear weapons manufacturing areas, and mine tailings sites (2). In oxygen-containing groundwater, uranium is generally found in the hexavalent oxidation state (3,4), which is a relatively soluble chemical form. As U(VI) is transported through

340

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM - ELIMINATION REPORT FOR  

Office of Legacy Management (LM)

- - ELIMINATION REPORT FOR . UNIVERSITY OF NEVADA MACKAY SCHOOL OF MINES RENO, NEVADA s,d k I",, ici ;3J(, i Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES 1 , Page . 1 2 2 2' 3 3 iii The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decommissioning Projects (and/or predecessor offices and divisions) has reviewed the past activities conducted under contract to the Atomic Energy Conrmission (AEC) at the University of Nevada, Mackay

Note: This page contains sample records for the topic "risk-based preliminary remediation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

FORMER ALLIED CHEMICAL CORPORATION, CHEMICALS COMPANY FORMER ALLIED CHEMICAL CORPORATION, CHEMICALS COMPANY (NOW GENERAL CHEMICAL CORPORATION) NORTH CLAYMONT, DELAWARE Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioni.ng Projects " .___ . ..-. --.- ------ ". CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES Page 1 1 1 2 2 2 4 ii INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decommissioning Projects (and/or predecessor agencies, offices, and divisions) has reviewed the past activities of the Manhattan Engineer -- District (MED) and the Atomic Energy Commission (AEC) at the Allied Chemical

342

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

AMOCO CHEMICAL COMPANY AMOCO CHEMICAL COMPANY (THE FORMER TEXAS CITY CHEMICALS, INC.) TEXAS CITY, TEXAS Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS Summary of Findings REFERENCES ii --.. ---_ .l.- _-__II__-_. -. Page 1 7 7 ' c . ELIMINATION REPORT AMOCO CHEMICAL COMPANY (THE FORMER TEXAS CITY CHEMICALS, INC.) TEXAS CITY, TEXAS INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decommissioning Projects (and/or predecessor offices and divisions), has reviewed the past activities conducted on behalf of the Atomic

343

Hydrogen Embrittlement of Pipeline Steels: Causes and Remediation  

NLE Websites -- All DOE Office Websites (Extended Search)

Embrittlement Embrittlement of Pipeline Steels: Causes and Remediation P. Sofronis, I. M. Robertson, D. D. Johnson University of Illinois at Urbana-Champaign Hydrogen Pipeline Working Group Workshop Augusta, GA, August 30, 2005 Funding and Duration * Timeline - Project start date: 7/20/05 - Project end date: 7/19/09 - Percent complete: 0.1% * Budget: Total project funding: 300k/yr * DOE share: 75% * Contractor share: 25% * Barriers - Hydrogen embrittlement of pipelines and remediation (mixing with water vapor?) - Assessment of hydrogen compatibility of the existing natural gas pipeline system for transporting hydrogen - Suitable steels, and/or coatings, or other materials to provide safe and reliable hydrogen transport and reduced capital cost 2 Team and Collaborators 3 * Industrial Partners: SECAT

344

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

SYLVANIA-CORNING NUCLEAR CORPORATION SYLVANIA-CORNING NUCLEAR CORPORATION BAYSIDE, NEW YORK VW. Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects ..- .-- ---- CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES ii Page 1 L 2 2 3 3 5 5 - --__( -_..... _ .._ ELIMINATION REPORT THE FORMER SYLVANIA-CORNING NUCLEAR CORPORATION BAYSIDE, NEW YORK L -rc c INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decommissioning Projects (and/or predecessor agencies, offices, and divisions) has reviewed the past activities of the Atomic Energy

345

NE-24 Unlverslty of Chicayo Remedial Action Plan  

Office of Legacy Management (LM)

(YJ 4 tlsj .?I2 (YJ 4 tlsj .?I2 416 17 1983 NE-24 Unlverslty of Chicayo Remedial Action Plan 22&d 7 IA +-- E. I.. Keller, Director Technical Services Division Oak Ridge Operations Ufflce In response to your memorandum dated July 29, 1983, the Field Task Proposal/Agreement (FTP/A) received frw Aryonne National Laboratory (ANL) appears to be satisfactory, and this office concurs in the use of ANL to provide the decontamination effort as noted in the FTP/A. The final decontaminatton report should Include the data needed for certiff- cation of the cleanup and any contamination left In place, e.g., sewer lines should be so documented in the permanent records of the University as well as the certification documents and reports. The remedial action to be conducted appears to be clearly InsIgnifIcant from an environmental

346

Monticello Mill Tailings Site Operable Unit Ill Interim Remedial Action  

Office of Legacy Management (LM)

Site Site Operable Unit Ill Interim Remedial Action Mark Perfxmed Under DOE Contrici No. DE-AC13-96CJ873.35 for th3 U.S. De[:ar!menf of Energy app~oveJioi'ptiL#ic re1ease;dCinWlionis Unlimilra' This page intentionally left blank Monticello Mill Tailings Site Operable Unit I11 Interim Remedial Action Annual Status Report August 1999 Prepared for U.S. Department of Energy Albuquerque Operations Office Grand Junction Office Project Number MSG-035-0011-00-000 Document Number Q0017700 Work Performed Under DOE Contract Number DE-AC13-96GJ87335 Task Order Number MAC99-03 This page intentionally blank Document Number Q0017700 Acronyms Contents Page ACRONYMS .............................................................................................................................. V

347

Final Report Northeast Site Area B NAPL Remediation Project  

Office of Legacy Management (LM)

Northeast Site Area B Northeast Site Area B NAPL Remediation Project at the Young - Rainey STAR Center Largo, Pinellas County, Florida April 2007 Office of Legacy Management DOE M/1457 2007 - -L Work Performed Under DOE Contract No. for the U.S. Department of Energy Office of Legacy Management. DE-AC01-02GJ79491 Approved for public release; distribution is unlimited. Office of Legacy Management Office of Legacy Management Office of Legacy Management U.S. Department of Energy This page intentionally left blank DOE-LM/1457-2007 Final Report Northeast Site Area B NAPL Remediation Project at the Young - Rainey STAR Center Largo, Pinellas County, Florida April 2007 Work Performed by S.M. Stoller Corporation under DOE Contract No. DE-AC01-02GJ79491 for the U.S. Department of Energy Office of Legacy Management, Grand Junction, Colorado

348

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT,  

Office of Legacy Management (LM)

REPORT, REPORT, FOR AL-TECH SPECIALTY STEEL CORPORATION (THE FORMER ALLEGHENY-LUDLUM STEEL CORPORATION) WATERVLIET, NEW YORK, AND DUNKIRK, NEW YORK Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste.Technology Division of Facility and Site Decommissioning Projects CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES * 1 2 2 2 3 4 4 . . . 111 ELIMINATION REPORT AL-TECH SPECIALTY STEEL CORPORATION (THE FORMER ALLEGHENY-LUDLUM STEEL CORPORATION) WATERVLIET. NEW YORK, AND DUNKIRK, NEW YORK INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decommissioning Projects (and/or predecessor agencies, offices, and

349

Remedial Alternative Selection for the F Area Tank Farm,  

NLE Websites -- All DOE Office Websites (Extended Search)

Notice of Availability: Notice of Availability: Explanation of Significant Difference for Incorporating Tanks 18 and 19 into Revision 1 Interim Record Of Decision Remedial Alternative Selection for the F Area Tank Farm, Waste Tanks 17 and 20 at the Savannah River Site The Explanation of Significant Difference for Incorporating Tanks 18 and 19 into Revision 1 Interim Record of Decision Remedial Alternative Selection for the F Area Tank Farm, (hereafter referred to as the Tank 18 and 19 ESD) is being issued by the U.S. Department of Energy (DOE), the lead agency for the Savannah River Site (SRS), with concurrence by the U.S. Environmental Protection Agency - Region 4 (EPA), and South Carolina Department of Health and Environmental Control (SCDHEC). The Tank 18 and 19 ESD modifies

350

In-situ groundwater remediation by selective colloid mobilization  

DOE Patents (OSTI)

An in-situ groundwater remediation pump and treat technique effective for reclamation of aquifers that have been contaminated with a mixed, metal-containing waste, which promotes selective mobilization of metal oxide colloids with a cationic surfactant, preferably a quaternary alkylammonium surfactant, without significantly reducing formation permeability that often accompanies large-scale colloid dispersion, thus increasing the efficiency of the remediation effort by enhancing the capture of strongly sorbing contaminants associated with the oxide phases. The resulting suspension can be separated from the bulk solution with controlled pH adjustments to destabilize the oxide colloids, and a clear supernatant which results that can be recycled through the injection well without further waste treatment.

Seaman, John C. (New Ellenton, SC); Bertch, Paul M. (Aiken, SC)

1998-01-01T23:59:59.000Z

351

In situ RF/microwave remediation of soil experiment overview  

SciTech Connect

Contaminant plumes are significant waste problems that require remediation in both the government and private sectors. The authors are developing an in situ process that uses RF/microwave stimulation to remove pollutants from contaminated soils. This process is more efficient than existing technologies, creates less secondary pollution, and is applicable to situations that are not amenable to treatment by existing technologies. Currently, the most commonly used process is soil vapor extraction. However, even when it is successful, this technology is energy inefficient. The authors objective is to combine RF/microwave energy application with soil vapor extraction to help mobilize and efficiently remove the soil contaminants, specifically demonstrating the viability of RF/microwave induced, in situ, soil remediation of light and dense non-aqueous phase liquids (LNAPL, DNAPL) contaminants.

Regan, A.H.; Palomares, M.E.; Polston, C.; Rees, D.E.; Roybal, W.T. [Los Alamos National Lab., NM (United States); Ross, T.J. [Univ. of New Mexico, Albuquerque, NM (United States)

1995-09-01T23:59:59.000Z

352

Clean option: An alternative strategy for Hanford Tank Waste Remediation  

SciTech Connect

Plans for remediation of the Hanford underground storage tanks are currently undergoing reevaluation. As part of this process, many options are being considered for the Tank Waste Remediation System (MRS). The clean option'' described here proposes an aggressive waste processing strategy to achieve the three ma or objectives: Greatly reduce the volume of high-level waste (HLW) to lessen demands on geologic repository space; decrease by several orders of magnitude the amount of radioactivity and toxicity now in the waste tanks that will be left permanently onsite as low-level solid waste (LLW); and accomplish the first two objectives without significantly increasing the total amount of waste for disposal. The study discussed here focuses on process chemistry, as it provides the foundation for achieving the clean option objectives. Because demonstrated separation steps have been identified and connected in a way that meets these objectives, the study concludes that the process chemistry rests on a firm technical basis.

Straalsund, J.L.; Swanson, J.L.; Baker, E.G.; Jones, E.O.; Kuhn, W.L. (Pacific Northwest Lab., Richland, WA (United States)); Holmes, J.J. (Westinghouse Hanford Co., Richland, WA (United States))

1992-12-01T23:59:59.000Z

353

A method for desalination and water remediation by hydrodynamic cavitation  

Science Journals Connector (OSTI)

Water is becoming an increasingly valuable commodity with population growth demanding more and more amounts of this limited resource. Increased efforts are directed toward recycling and remediation as well as desalination of the large quantities of seawater available. Dr. Bertwin Langenecker was a pioneer in utilizing hydrodynamic cavitation in a variety of applications that would remove dissolved solids from water and other liquids. His combination of intense cavitation using a rotor-stator combination as well as simultaneously adding an adsorbent demonstrated impressive results in desalination and waste water remediation. In this presentation a description will be given of Dr. Langenecker’s technology as well as a sampling of some of his most impressive results. Speculations as to why this approach works as well as it does will be presented.

2013-01-01T23:59:59.000Z

354

A method for desalination and water remediation by hydrodynamic cavitation  

Science Journals Connector (OSTI)

Water is becoming an increasingly valuable commodity with population growth demanding more and more amounts of this limited resource. Increased efforts are directed toward recycling and remediation as well as desalination of the large quantities of seawater available. Dr. Bertwin Langenecker was a pioneer in utilizing hydrodynamic cavitation in a variety of applications that would remove dissolved solids from water and other liquids. His combination of intense cavitation using a rotor-stator combination as well as simultaneously adding an adsorbent demonstrated impressive results in desalination and waste water remediation. In this presentation a description will be given of Dr. Langenecker's technology as well as a sampling of some of his most impressive results. Speculations as to why this approach works as well as it does will be presented.

Lawrence A. Crum; Michael Skinner; Scott Zeilinger

2013-01-01T23:59:59.000Z

355

Decontamination formulation with additive for enhanced mold remediation  

DOE Patents (OSTI)

Decontamination formulations with an additive for enhancing mold remediation. The formulations include a solubilizing agent (e.g., a cationic surfactant), a reactive compound (e.g., hydrogen peroxide), a carbonate or bicarbonate salt, a water-soluble bleaching activator (e.g., propylene glycol diacetate or glycerol diacetate), a mold remediation enhancer containing Fe or Mn, and water. The concentration of Fe.sup.2+ or Mn.sup.2+ ions in the aqueous mixture is in the range of about 0.0001% to about 0.001%. The enhanced formulations can be delivered, for example, as a foam, spray, liquid, fog, mist, or aerosol for neutralization of chemical compounds, and for killing certain biological compounds or agents and mold spores, on contaminated surfaces and materials.

Tucker, Mark D. (Albuquerque, NM); Irvine, Kevin (Huntsville, AL); Berger, Paul (Rome, NY); Comstock, Robert (Bel Air, MD)

2010-02-16T23:59:59.000Z

356

In-situ groundwater remediation by selective colloid mobilization  

DOE Patents (OSTI)

An in-situ groundwater remediation pump and treat technique is described which is effective for reclamation of aquifers that have been contaminated with a mixed, metal-containing waste, and which promotes selective mobilization of metal oxide colloids with a cationic surfactant, preferably a quaternary alkylammonium surfactant, without significantly reducing formation permeability that often accompanies large-scale colloid dispersion, thus increasing the efficiency of the remediation effort by enhancing the capture of strongly sorbing contaminants associated with the oxide phases. The resulting suspension can be separated from the bulk solution with controlled pH adjustments to destabilize the oxide colloids, and a clear supernatant which results that can be recycled through the injection well without further waste treatment. 3 figs.

Seaman, J.C.; Bertch, P.M.

1998-12-08T23:59:59.000Z

357

Preliminary Fuel Cell Manufacturing R&D Topics | Department of...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Preliminary Fuel Cell Manufacturing R&D Topics Preliminary Fuel Cell Manufacturing R&D Topics Preliminary draft research topics subject to revision prior to a soliciatation being...

358

FORMERLY REMEDIAL UTILIZED SITES ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

REMEDIAL UTILIZED SITES ACTION PROGRAM ELIMINATION REPORT FOR FORMER CARPENTER STEEL COMPANY; 101 WEST BERN STREET; READING, PENNSYLVANIA December 1991 U.S. Department of Energy Office of Environmental Restoration Elimination Report Former Carpenter Steel Company CONTENTS INTRODUCTION ........................... 1 BACKGROUND ............................ 1 Site Function ......................... Site Description. ....................... : Radiological History and Status ................ 2 ELIMINATION ANALYSIS ....................... 3 REFERENCES ............................ 4 Elimination Report Former Carpenter Steel Company INTRODUCTION The Department of Energy (DOE), Office of Environmental Restoration, has reviewed the past activities of the Manhattan Engineer District (MEO) and

359

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

< < .. ,:. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT FOR JESSOP STEEL COMPANY; 500 GREEN STREET: WASHINGTON, PENNSYLVANIA December 1991 U.S. Department of Energy Office of Environmental Restoration Elimination Report Jessop Steel Company CONTENTS INTRODUCTION ...................... .'. .... 1 BACKGROUND ............................. 1 Site Function Site Description : : : : : : : .................................... : Radiological History and Status ................. 2 ELIMINATION ANALYSIS ........................ 3 REFERENCES .............................. 4 Elimination Report Jessop Steel Company 1 INTRODUCTION The Department of Energy (DOE)., Office of Environmental Restoration, has reviewed the past activities of the Manhattan Engineer District (MED) and

360

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

REMEDIAL ACTION PROGRAM ELIMINATION REPORT SONABOND ULTRASONICS FORMERLY AEROPROJECTS, INC. 200-T E. ROSEDALE AVENUE WEST CHESTER,~PENNSYLVANIA December 1991 U.S. Department of Energy Office of Environmental Restoration and Waste Management Office of Environmental Restoration Office of Eastern Area Programs . . . CONTENTS INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . BACKGROUND . . . . . . . . . . . . . . . . . . . . . . . . Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS . . . . . . . . . . . . . . . . . . . REFERENCES . . . . . . . . . . . . . . . . . . . . . . . . m . . 1 . . 1 . . 2 . . 2 I . . ELIMINATIO N REPO R T SONABOND ULTRASONICS FORMERLY AEROPROJECTS, INC. 200-T E. ROSEDALE AVENUE W EST CHESTER, PENNSYLVANIA

Note: This page contains sample records for the topic "risk-based preliminary remediation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Mercury contaminated sediment sites—An evaluation of remedial options  

SciTech Connect

Mercury (Hg) is a naturally-occurring element that is ubiquitous in the aquatic environment. Though efforts have been made in recent years to decrease Hg emissions, historically-emitted Hg can be retained in the sediments of aquatic bodies where they may be slowly converted to methylmercury (MeHg). Consequently, Hg in historically-contaminated sediments can result in high levels of significant exposure for aquatic species, wildlife and human populations consuming fish. Even if source control of contaminated wastewater is achievable, it may take a very long time, perhaps decades, for Hg-contaminated aquatic systems to reach relatively safe Hg levels in both water and surface sediment naturally. It may take even longer if Hg is present at higher concentration levels in deep sediment. Hg contaminated sediment results from previous releases or ongoing contributions from sources that are difficult to identify. Due to human activities or physical, chemical, or biological processes (e.g. hydrodynamic flows, bioturbation, molecular diffusion, and chemical transformation), the buried Hg can be remobilized into the overlying water. Hg speciation in the water column and sediments critically affect the reactivity (i.e. conversion of inorganic Hg(II) to MeHg), transport, and its exposure to living organisms. Also, geochemical conditions affect the activity of methylating bacteria and its availability for methylation. This review paper discusses remedial considerations (e.g. key chemical factors in fate and transport of Hg, source characterization and control, environmental management procedures, remediation options, modeling tools) and includes practical case studies for cleaning up Hg-contaminated sediment sites. -- Highlights: ? Managing mercury-contaminated sediment sites are challenging to remediate. ? Remediation technologies are making a difference in managing these sites. ? Partitioning plays a dominant role in the distribution of mercury species. ? Mathematical models can be used to help us understand the chemistry and processes.

Randall, Paul M., E-mail: randall.paul@epa.gov [U.S. Environmental Protection Agency, Office of Research and Development, National Risk Management Research Laboratory, 26 West Martin Luther King Drive, Cincinnati, OH 45268 (United States); Chattopadhyay, Sandip, E-mail: Sandip.Chattopadhyay@tetratech.com [Tetra Tech, Inc., 250 West Court Street, Suite 200W, Cincinnati, OH 45202 (United States)] [Tetra Tech, Inc., 250 West Court Street, Suite 200W, Cincinnati, OH 45202 (United States)

2013-08-15T23:59:59.000Z

362

Integrating GIS and GPS in environmental remediation oversight  

SciTech Connect

This paper presents findings on Ohio EPA Office of Federal Facilities Oversight`s (OFFO) use of GIS and GPS for environmental remediation oversight at the U.S. Department of Energy`s (DOE) Fernald Site. The Fernald site is a former uranium metal production facility within DOE`s nuclear weapons complex. Significant uranium contamination of soil and groundwater is being remediated under state and federal regulations. OFFO uses GIS/GPS to enhance environmental monitoring and remediation oversight. These technologies are utilized within OFFO`s environmental monitoring program for sample location and parameter selection, data interpretation and presentation. GPS is used to integrate sample data into OFFO`s GIS and for permanently linking precise and accurate geographic data to samples and waste units. It is important to identify contamination geographically as all visual references (e.g., buildings, infrastructure) will be removed during remediation. Availability of the GIS allows OFFO to perform independent analysis and review of DOE contractor generated data, models, maps, and designs. This ability helps alleviate concerns associated with {open_quotes}black box{close_quotes} models and data interpretation. OFFO`s independent analysis has increased regulatory confidence and the efficiency of design reviews. GIS/GPS technology allows OFFO to record and present complex data in a visual format aiding in stakeholder education and awareness. Presented are OFFO`s achievements within the aforementioned activities and some reasons learned in implementing the GIS/GPS program. OFFO`s two years of GIS/GPS development have resulted in numerous lessons learned and ideas for increasing effectiveness through the use of GIS/GPS.

Kaletsky, K.; Earle, J.R.; Schneider, T.A. [Ohio EPA, Dayton, OH (United States)

1996-12-31T23:59:59.000Z

363

Remedial Action Work Plan Amchitka Island Mud Pit Closures  

SciTech Connect

This remedial action work plan presents the project organization and construction procedures developed for the performance of the remedial actions at U.S. Department of Energy (DOE's) sites on Amchitka Island, Alaska. During the late1960s and early 1970s, the U.S. Department of Defense and the U.S. Atomic Energy Commission (the predecessor agency to DOE) used Amchitka Island as a site for underground nuclear tests. A total of nine sites on the Island were considered for nuclear testing; however, tests were only conducted at three sites (i.e., Long Shot in 1965, Milrow in 1969, and Cannikin in 1971). In addition to these three sites, large diameter emplacement holes were drilled in two other locations (Sites D and F) and an exploratory hole was in a third location (Site E). It was estimated that approximately 195 acres were disturbed by drilling or preparation for drilling in conjunction with these activities. The disturbed areas include access roads, spoil-disposal areas, mud pits which have impacted the environment, and an underground storage tank at the hot mix plant which was used to support asphalt-paving operations on the island. The remedial action objective for Amchitka Island is to eliminate human and ecological exposure to contaminants by capping drilling mud pits, removing the tank contents, and closing the tank in place. The remedial actions will meet State of Alaska regulations, U.S. Fish and Wildlife Service refuge management goals, address stakeholder concerns, and address the cultural beliefs and practices of the native people. The U.S. Department of Energy, Nevada Operations Office will conduct work on Amchitka Island under the authority of the Comprehensive Emergency Response, Compensation, and Liability Act. Field activities are scheduled to take place May through September 2001. The results of these activities will be presented in a subsequent Closure Report.

DOE/NV

2001-04-05T23:59:59.000Z

364

FORMERLY UTILIZED elTEB REMEDIAL ACTION PROORAM [FUSRAP] AND  

Office of Legacy Management (LM)

bE8IQM CRITERIA FOR bE8IQM CRITERIA FOR r FORMERLY UTILIZED elTEB REMEDIAL ACTION PROORAM [FUSRAP] AND r 8URPLUS FACIL~TIES MANAOEMENT PROQRAM [SFMPI FEBRUARY 1886 i r s o i - o o - ~ c - o l - 1 ~ R e v . 1 DESIGN CRITERIA FOR FORMERLY UTILIZED Sf TES REMEDIAL' ACTION PROGAM ( PUSRAPL AND . . -- SURPLUS F A C I L I T I E S UANAGEMENT PROGRAM ( SFMP ( I S S U E D FOR CLIENT APPROVAL) SF proved by: 2-24-86 D a t e T e c h n i c a l Services D i v i s i o n A p p r o v e d by: 2-24-86 D a t e C o n s t r u c t i o n a n d E n g i n e e r i n g Oak R i d g e O p e r a t i o n s O f f ice 14SOl-00-PC-01 Rev. 1 PREFACE T O DESIGN CRITERIA These design criteria have been written in a generic form that sunmarizes criteria applicabl'e for remedial action and long-tern ranasenent activities associated with t h e radioactive wastes at the FOSRAP *and SFflP sites. Site-specific information i

365

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

WINCHESTER ENGINEERING AND ANALYTICAL CENTER WINCHESTER ENGINEERING AND ANALYTICAL CENTER (NORTHEASTERN RADIOLOGICAL HEALTH LABORATORY) WINCHESTER, MASSACHUSE'ITS Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects . . I . I C O N T E N T S IN T R O D U C T IO N B A C K G R O U N D S i te F u n c ti o n S i te D e s c ri p ti o n R a d i o l o g i c a l H i s to ry a n d S ta tu s E L IM IN A T IO N A N A L Y S IS R E F E R E N C E S - P a g e 1 2 2 2 3 5 5 i i i -..- - ELIMINATION REPORT WINCHESTER ENGINEERING AND ANALYTICAL CENTER (NORTHEASTERN RADIOLOGICAL HEALTH LABORATORY) WINCHESTER, MASSACHUSETTS INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of Terminal Waste Disposal and Remedial Action, Division of Remedial Action Projects (and/or predecessor agencies, offices and divisions,)

366

Remediation of a uranium-contamination in ground water  

SciTech Connect

The former production site of NUKEM where nuclear fuel-elements were developed and handled from 1958 to 1988 was situated in the centre of an industrial park for various activities of the chemical and metallurgical industry. The size of the industrially used part is about 300.000 m{sup 2}. Regulatory routine controls showed elevated CHC (Chlorinated Hydro-Carbons) values of the ground water at the beginning of the 1990's in an area which represented about 80.000 m{sup 2} down-gradient of locations where CHC compounds were stored and handled. Further investigations until 1998 proved that former activities on the NUKEM site, like the UF{sub 6} conversion process, were of certain relevance. The fact that several measured values were above the threshold values made the remediation of the ground water mandatory. This was addressed in the permission given by the Ministry for Nuclear Installations and Environment of Hesse according to chap. 7 of the German atomic law in October 2000. Ground water samples taken in an area of about 5.000 m{sup 2} showed elevated values of total Uranium activity up to between 50 and 75 Bq/l in 2002. Furthermore in an area of another 20.000 m{sup 2} the samples were above threshold value. In this paper results of the remediation are presented. The actual alpha-activities of the ground waters of the remediation wells show values of 3 to 9 Bq/l which are dominated by 80 to 90 % U-234 activity. The mass-share of total Uranium for this nuclide amounts to 0,05% on average. The authority responsible for conventional water utilisation defined target values for remediation: 20 {mu}g/l for dissolved Uranium and 10 {mu}g/l for CHC. Both values have not yet been reached for an area of about 10.000 m{sup 2}. The remediation process by extracting water from four remediation wells has proved its efficiency by reduction of the starting concentrations by a factor of 3 to 6. Further pumping will be necessary especially in that area of the site where the contaminations were found later during soil remediation activities. Only two wells have been in operation since July 2002 when the remediation technique was installed and an apparatus for direct gamma-spectroscopic measurement of the accumulated activities on the adsorbers was qualified. Two further remediation wells have been in operation since August 2006, when the installed remediation technique was about to be doubled from a throughput of 5 m{sup 3}/h to 10 m{sup 3}/h. About 20.000 m{sup 3} of ground water have been extracted since from these two wells and the decrease of their Uranium concentrations behaves similar to that of the two other wells being extracted since the beginning of remediation. Both, total Uranium-concentrations and the weight-share of the nuclides U-234, U-235 and U-238 are measured by ICP-MS (Inductively Coupled Plasma - Mass Spectrometry) besides measurements of Uranium-Alpha-Activities in addition to the measurement of CHC components of which PCE (Per-chlor-Ethene) is dominant in the contaminated area. CHC compounds are measured by GC (Gas Chromatography). Down-gradient naturally attenuated products are detected in various compositions. Overall 183.000 m{sup 3} of ground water have been extracted. Using a pump and treat method 11 kg Uranium have been collected on an ion-exchange material based on cellulose, containing almost 100 MBq U-235 activity, and almost 15 kg of CHC, essentially PCE, were collected on GAC (Granules of Activated Carbon). Less than 3% of the extracted Uranium have passed the adsorber-system of the remediation plant and were adsorbed by the sewage sludge of the industrial site's waste water treatment. The monthly monitoring of 19 monitoring wells shows that an efficient artificial barrier was built up by the water extraction. The Uranium contamination of two ground water plumes has drastically been reduced by the used technique dependent on the amounts of extracted water. The concentration of the CHC contamination has changed depending on the location of temporal pumping. Thereby maximum availability of this contaminan

Woerner, Joerg; Margraf, Sonja; Hackel, Walter [RD Hanau GmbH (Germany)

2007-07-01T23:59:59.000Z

367

Environmental restoration and remediation technical data management plan  

SciTech Connect

The tasks performed in the Remedial Investigation/Feasibility Study (RI/FS) work plan for each Hanford Site operable unit must meet the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) and the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et. al 1992). An extensive amount of data will be generated in the evaluation and remediation of hazardous waste sites at the Site. The data must be of sufficient quality, as they will be used to evaluate the need, select the method(s), and support the full remediation of the waste sites as stipulated in the Tri-Party Agreement. In particular, a data management plan (DMP) is to be included in an RI/FS work plan for managing the technical data obtained during the characterization of an operable unit, as well as other data related to the study of the operable unit. Resource Conservation and Recovery Act of 1976 (RCRA) sites are involved in the operable unit. Thus, the data management activities for the operable unit should be applied consistently to RCRA sites in the operable unit as well. This DMP provides common direction for managing-the environmental technical data of all defined operable units at the Hanford Site during the RI/FS activities. Details specific to an operable unit will be included in the actual work plan of that operable unit.

Key, K.T.; Fox, R.D.

1994-02-01T23:59:59.000Z

368

ELECTROCHEMICAL REMEDIATION OF ARSENIC-CONTAMINATED GROUNDWATER — RESULTS OF PROTOTYPE FIELD TESTS IN BANGLADESH  

SciTech Connect

According to the World Health Organization (WHO), more than 50 million people in Bangladesh drink arsenic-laden water, making it the largest case of mass poisoning in human history. Many methods of arsenic removal (mostly using chemical adsorbents) have been studied, but most of these are too expensive and impractical to be implemented in poor countries such as Bangladesh. This project investigates ElectroChemical Arsenic Remediation (ECAR) as an affordable means of removing arsenic. Experiments were performed on site in Bangladesh using a prototype termed “sushi”. This device consists of carbon steel sheets that serve as electrodes wrapped into a cylinder, separated by plastic mesh and surrounded by a tube-like container that serves as a holding cell in which the water is treated electrochemically. During the electrochemical process, current is applied to both electrodes causing iron to oxidize to various forms of iron (hydr)oxides. These species bind to arsenic(V) with very high affi nity. ECAR also has the advantage that As(III), the more toxic form of arsenic, oxidizes to As(V) in situ. Only As(V) is known to complex with iron (hydr)oxides. One of the main objectives of this research is to demonstrate the ability of the new prototype to reduce arsenic concentrations in Bangladesh groundwater from >200 ppb to below the WHO limit of 10 ppb. In addition, varying fl ow rate and dosage and the effect on arsenic removal was investigated. Experiments showed that ECAR reduced Bangladeshi water with an initial arsenic concentration as high as 250 ppb to below 10 ppb. ECAR proved to be effective at dosages as high as 810 Coulombs/Liter (C/L) and as low as 386 C/L (current 1 A, voltage 12 V). These results are encouraging and provide great promise that ECAR is an effi cient method in the remediation of arsenic from contaminated groundwater. A preliminary investigation of arsenic removal trends with varying Coulombic dosage, complexation time and fi ltration methods is also presented.

Kowolik, K; Addy, S.E.A.; Gadgil, A.

2009-01-01T23:59:59.000Z

369

PRELIMINARY ASSESSMENT OF ENERGY ISSUES  

E-Print Network (OSTI)

PRELIMINARY ASSESSMENT OF ENERGY ISSUES ASSOCIATED WITH THE KLAMATH HYDROELECTRIC PROJECT Kevin OF ENERGY ISSUES ASSOCIATED WITH THE KLAMATH HYDROELECTRIC PROJECT Summary As requested by the California Hydroelectric Project (FERC No. 2082). Staff's assessment indicates that, from the perspective of potential

370

EA-1679: Preliminary Environmental Assessment | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Preliminary Environmental Assessment Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington...

371

Discussion Draft of the Preliminary Cybersecurity Framework Discussion Draft of the Preliminary  

E-Print Network (OSTI)

1 Discussion Draft of the Preliminary Cybersecurity Framework Discussion Draft of the Preliminary Cybersecurity Framework August 28, 2013 #12;5 10 15 20 25 30 35 Discussion Draft of the Preliminary Cybersecurity Framework 2 3 A Discussion Draft of the Preliminary Cybersecurity Framework for improving critical

Bentz, Dale P.

372

EIS-0355: Remediation of the Moab Uranium Mill Tailings, Grand and San Juan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

355: Remediation of the Moab Uranium Mill Tailings, Grand and 355: Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah EIS-0355: Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah Summary The Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah, Environmental Impact Statement and associated supplements and amendments provides information on the environmental impacts of the U.S. Department of Energy's (DOE's) proposal to (1) remediate approximately 11.9 million tons of contaminated materials located on the Moab site and approximately 39,700 tons located on nearby vicinity properties and (2) develop and implement a ground water compliance strategy for the Moab site using the framework of the Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Ground Water

373

DOE/OR/20722-88 Formerly Utilized Sites Remedial Action Program (FUSRAP)  

Office of Legacy Management (LM)

88 88 . Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DE-AC05-810R20722 POST-REMEDIAL ACTION REPORT FOR THE WAYNE SITE - 1985 AND 1987 Wayne, New Jersey March 1989 Bechtel National, Inc. DOE/OR/20722-88 POST-REMEDIAL ACTION REPORT FOR THE WAYNE SITE - 1985 AND 1987 WAYNE, NEW JERSEY MARCH 1989 Prepared for UNITED STATES DEPARTMENT OF ENERGY OAK RIDGE OPERATIONS OFFICE Under Contract No. DE-AC05-810R20722 BY R. M. Howard Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 TABLE OF CONTENTS Paqe 1.0 2.0 3.0 4.0 Introduction 1.1 Background 1.2 History Remedial Action Guidelines 5 Remedial Action 3.1 Cleanup/Decontamination Activities 3.2 Contamination Control During the Cleanup 8 8 11 Post-Remedial-Action Sampling 13

374

Remediation of Methyl Iodide in Aqueous Solution and Soils Amended with Thiourea  

Science Journals Connector (OSTI)

Remediation of Methyl Iodide in Aqueous Solution and Soils Amended with Thiourea ... Therefore, spraying thiourea on the soil surface to form a “reactive surface barrier” may be an effective and innovative strategy for controlling fumigant emissions to the atmosphere and for improving environmental protection. ... Currently, new and innovative remediation technologies including bioremediation, phytoremediation, and chemical remediation have been proposed for use in cleaning polluted soil and groundwater. ...

Wei Zheng; Sharon K. Papiernik; Mingxin Guo; Scott R. Yates

2004-01-08T23:59:59.000Z

375

Remedial System Performance Improvement for the 200-ZP-1_PW-1 Operable Units at Hanford  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hanford Operations Review Report: Feasibility Study Strategies and Remedial System Performance Improvement for the 200- ZP-1/PW-1 Operable Units at Hanford Prepared for Office of Groundwater and Soil Remediation Office of Environmental Management February 9, 2007 i EXECUTIVE SUMMARY At the request of the U.S. Department of Energy, Headquarters' Office of Environmental Management, the Office of Groundwater and Soil Remediation (EM-22), performed a Remediation System Evaluation (RSE) of the 200-ZP-1/PW-1 groundwater pump and treat (P&T) system, as well as the vadose zone Soil Vapor Extraction (SVE) system at the Hanford

376

DOE/OFVZ1949402 Formerly Utilized Sites Remedial Action Program (FUSRAP)  

Office of Legacy Management (LM)

DOE/OFVZ1949402 DOE/OFVZ1949402 Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DE-ACO5-9%OR21949 Post-Remedial Action Report for the Former Baker Brothers Site Toledd, Ohio . February 1997 . . DOWORRl949-402 POST-REMEDIAL ACTION REPORT FOR THE REMEDIAL ACTION ATTHE FORMER BAKER BROTHERS SITE TOLEDO. OHIO FEBRUARY 1997 . United States Department of Energy I OakRidgeOpcrationsOfficc Under Contract No. DE-AC059 I OR2 1949 BY Bcchtcl National, Inc. . . : ; '.' OakRldnc.Tc~~~.- ~--~-' -------m . . Be&cl Job No. 14501 CQNTENTS FIGURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..~~................................................................................ iv TABLES . . . . . . . ..i.................................................................................................................................

377

Remedial design work plan for Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee  

SciTech Connect

The Remedial Design Work Plan (RDWP) for Lower East Fork Poplar Creek (EFPC) Operable Unit (OU) in Oak Ridge, Tennessee. This remedial action fits into the overall Oak Ridge Reservation (ORR) cleanup strategy by addressing contaminated floodplain soil. The objective of this remedial action is to minimize the risk to human health and the environment from contaminated soil in the Lower EFPC floodplain pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the Federal Facility Agreement (FFA) (1992). In accordance with the FFA, a remedial investigation (RI) (DOE 1994a) and a feasibility study (DOE 1994b) were conducted to assess contamination of the Lower EFPC and propose remediation alternatives. The remedial investigation determined that the principal contaminant is mercury, which originated from releases during Y-12 Plant operations, primarily between 1953 and 1963. The recommended alternative by the feasibility study was to excavate and dispose of floodplain soils contaminated with mercury above the remedial goal option. Following the remedial investigation/feasibility study, and also in accordance with the FFA, a proposed plan was prepared to more fully describe the proposed remedy.

NONE

1995-10-01T23:59:59.000Z

378

E-Print Network 3.0 - area remediation case Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

Short Courses Module F: Remediation... for professionals working in or intending to enter the field of contaminated site assessment, ... Source: Baird, Mark - Climate and...

379

E-Print Network 3.0 - accelerated remedial strategy Sample Search...  

NLE Websites -- All DOE Office Websites (Extended Search)

Short Courses Module F: Remediation... for professionals working in or intending to enter the field of contaminated site assessment, ... Source: Baird, Mark - Climate and...

380

E-Print Network 3.0 - advanced remediation technologies Sample...  

NLE Websites -- All DOE Office Websites (Extended Search)

in humid gas streams Ann C. Gentilea)and Mark J. Kushnerb) Summary: remediation in humid gas streams is an efficient technology for disposal of volatile organic compounds......

Note: This page contains sample records for the topic "risk-based preliminary remediation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

The effects of viscosity and subsurface heterogeneity on a brine barrier approach to DNAPL remediation.  

E-Print Network (OSTI)

??Dense nonaqueous phase liquids (DNAPLs) are a long-term source of groundwater contamination. Difficulties of current remediation methods have led to the study of a novel… (more)

Murphy, Lauren L.

2006-01-01T23:59:59.000Z

382

Record of Decision/Remedial Alternative Selection for the Motor Shops Seepage Basin (716-A)  

SciTech Connect

This decision document presents the selected remedial alternative for the Motor Shops Seepage Basin located at the Savannah River Site in Aiken, South Carolina

Palmer, E.

1999-02-03T23:59:59.000Z

383

Voluntary Protection Program Onsite Review, CHPlateau Remediation Contract Hanford Site- March 2011  

Energy.gov (U.S. Department of Energy (DOE))

Evaluation to determine whether Plateau Remediation Contract Hanford Site is continuing to perform at a level deserving DOE-VPP Star recognition.

384

Rules and Regulations for the Investigation and Remediation of Hazardous Material Releases (Rhode Island)  

Energy.gov (U.S. Department of Energy (DOE))

These regulations establish procedures for the investigation and remediation of contamination resulting from the unpermitted release of hazardous materials. The regulations aim to protect water...

385

Successful Field-Scale In Situ Thermal NAPL Remediation at the Young- Rainey STAR Center  

Energy.gov (U.S. Department of Energy (DOE))

Proceedings of the Fourth International Conference on Remediation of Chlorinated and Recalcitrant Compounds.May 2004, Monterey, California.Randall Juhlin, Michael Butherus, Joseph Daniel, David S....

386

INVESTIGATION OF REMEDIAL EDUCATION COURSE SCORES AS A PREDICTOR OF FRESHMAN-LEVEL COURSE PERFORMANCES.  

E-Print Network (OSTI)

??This study sought to determine the relationship between the performance in remedial courses (English and math) and college-level course performances among students in a large… (more)

Ulmer, Larry

2010-01-01T23:59:59.000Z

387

Lovato learning: a guide for interactive, differential instruction in a high school remedial math class.  

E-Print Network (OSTI)

??The implementation of different instructional strategies and their affects on student attitudes toward learning will be investigated in two Northern Humboldt High School remedial math… (more)

Lovato, Susan

2006-01-01T23:59:59.000Z

388

Drought remedial measures through resistivity investigations in a typical crystalline region  

Science Journals Connector (OSTI)

Systematic geoelectrical investigations were carried out in a typical drought ... of Andhra Pradesh, India, for evolving drought remedial strategies. Depth to basement maps, geoelectrical...

B. H. Briz-Kishore

389

Innovative Soil and Groundwater Remediation; Applications and Demonstrations: The Site Program Experience  

Science Journals Connector (OSTI)

The Superfund Innovative Technology Evaluation (SITE) program of the ... United States Environmental Protection Agency (EPA) evaluates innovative hazardous waste remediation technologies. The program works with t...

S. Rock; J. Martin

1995-01-01T23:59:59.000Z

390

EIS-0195: Remedial Actions at Operable Unit 4, Fernald Environmental Management Project, Fernald, Ohio  

Energy.gov (U.S. Department of Energy (DOE))

This EIS evaluates the potential environmental impacts of a proposal to conduct remedial action at Operable Unit 4 at the Fernald Environmental Management Project.

391

Value tradeoffs for the Hanford Tank Waste Remediation System (TWRS) program  

SciTech Connect

The Tank Waste Remediation System (TWRS) program at the Hanford Site of the Department of Energy has adopted a logical approach to making decisions that uses decision analysis to structure and analyze decision alternatives and public values to evaluate them. This report is the third in a series to support this effort. The first identified a set of objectives (called {open_quotes}ends objectives{close_quotes}) that characterize the ultimate goals and desires of Hanford decision makers and stakeholders. The second report developed operational measures for these ends objectives (called {open_quotes}ends measures{close_quotes}) and it also developed a set of performance objectives and associated performance measures that are more directly related to how well decision alternatives in the TWRS program perform to achieve the ends objectives. The present report describes the development of quantitative value tradeoffs for both the ends measures and the performance measures. First, five national value experts were interviewed to obtain value tradeoffs for units of the ends measures identified in Keeney and von Winterfeldt (1996). The results of this assessment are shown in Table S1. Second, the implied value tradeoffs for the units of the performance measures were calculated from the value tradeoffs for units of the ends measures provided by the national experts. When calculating the value tradeoffs for the units of the performance measures, very simple quantitative relationships between ends and performance measures were assumed. The results of this calculation are shown in Table S2. The results of this report shown in Tables S1 and S2 should be considered preliminary and largely illustrative of the principles for developing value tradeoffs. The report lists several important caveats and recommendations for how future work can improve on the assessment of value tradeoffs.

Keeney, R.L.; Winterfeldt, D. von [Decision Insights, Inc., Irvine, CA (United States)

1997-09-01T23:59:59.000Z

392

Evaluation of Final Radiological Conditions at Areas of the Niagara Falls Storage Site Remediated under the Formerly Utilized Sites Remedial Action Program -12184  

SciTech Connect

The U. S. Department of Energy (DOE) methods and protocols allow evaluation of remediation and final site conditions to determine if remediated sites remain protective. Two case studies are presented that involve the Niagara Falls Storage Site (NFSS) and associated vicinity properties (VPs), which are being remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). These properties are a part of the former Lake Ontario Ordnance Works (LOOW). In response to stakeholders concerns about whether certain remediated NFSS VPs were putting them at risk, DOE met with stakeholders and agreed to evaluate protectiveness. Documentation in the DOE records collection adequately described assessed and final radiological conditions at the completed VPs. All FUSRAP wastes at the completed sites were cleaned up to meet DOE guidelines for unrestricted use. DOE compiled the results of the investigation in a report that was released for public comment. In conducting the review of site conditions, DOE found that stakeholders were also concerned about waste from the Separations Process Research Unit (SPRU) at the Knolls Atomic Power Laboratory (KAPL) that was handled at LOOW. DOE agreed to determine if SPRU waste remained at that needed to be remediated. DOE reviewed records of waste characterization, historical handling locations and methods, and assessment and remediation data. DOE concluded that the SPRU waste was remediated on the LOOW to levels that pose no unacceptable risk and allow unrestricted use and unlimited exposure. This work confirms the following points as tenets of an effective long-term surveillance and maintenance (LTS&M) program: ? Stakeholder interaction must be open and transparent, and DOE must respond promptly to stakeholder concerns. ? DOE, as the long-term custodian, must collect and preserve site records in order to demonstrate that remediated sites pose no unacceptable risk. ? DOE must continue to maintain constructive relationships with the U.S. Army Corps of Engineers and state and federal regulators.

Clayton, Christopher [U.S Department of Energy Office of Legacy Management, Washington, DC; Kothari, Vijendra [U.S Department of Energy Office of Legacy Management, Morgantown, West Virginia; Starr, Ken [U.S Department of Energy Office of Legacy Management, Westminster, Colorado; Widdop, Michael; Gillespie, Joey [SM Stoller Corporation, Grand Junction, Colorado

2012-02-26T23:59:59.000Z

393

FORMERLY USED SITES REMEDIAL ACTION PROGRAM DESIGNATION SUMMARY  

Office of Legacy Management (LM)

USED SITES USED SITES REMEDIAL ACTION PROGRAM DESIGNATION SUMMARY FOR ALBA CRAFT LABORATORY OXFORD, OHIO October 1, 1992 U.S. DEPARTMENT OF ENERGY OFFICE OF ENVIRONMENTAL RESTORATION Designation Summary Alba Craft Laboratory. Oxford CONTENTS INTRODUCTION .......... . . ..................... 1 BACKGROUND Site Function ......................... Site Description ..................... 1 Owner History ................. .. 2 Radiological History and Status............ 2 Authority Review .................... .. 3 DESIGNATION DETERMINATION ........ ....... 3 REFERENCES . ............ .... . 3 Designation Summary Alba Craft Laboratory, Oxford INTRODUCTION The Department of Energy (DOE), Office of Environmental Restoration, has reviewed the past activities of the Atomic Energy Commission (AEC) at the

394

Enhancement of in situ microbial remediation of aquifers  

DOE Patents (OSTI)

Methods are provided for remediating subsurface areas contaminated by toxic organic compounds. An innocuous oil, such as vegetable oil, mineral oil, or other immiscible organic liquid, is introduced into the contaminated area and permitted to move therethrough. The oil concentrates or strips the organic contaminants, such that the concentration of the contaminants is reduced and such contaminants are available to be either pumped out of the subsurface area or metabolized by microorganisms. Microorganisms may be introduced into the contaminated area to effect bioremediation of the contamination. The methods may be adapted to deliver microorganisms, enzymes, nutrients and electron donors to subsurface zones contaminated by nitrate in order to stimulate or enhance denitrification.

Fredrickson, James K. (Kennewick, WA); Brockman, Fred J. (Kennewick, WA); Streile, Gary P. (both or Richland, WA); Cary, John W. (both or Richland, WA); McBride, John F. (Carrboro, NC)

1993-01-01T23:59:59.000Z

395

Surfactant-enhanced remediation of organic contaminated soil and water  

Science Journals Connector (OSTI)

Surfactant based remediation technologies for organic contaminated soil and water (groundwater or surface water) is of increasing importance recently. Surfactants are used to dramatically expedite the process, which in turn, may reduce the treatment time of a site compared to use of water alone. In fact, among the various available remediation technologies for organic contaminated sites, surfactant based process is one of the most innovative technologies. To enhance the application of surfactant based technologies for remediation of organic contaminated sites, it is very important to have a better understanding of the mechanisms involved in this process. This paper will provide an overview of the recent developments in the area of surfactant enhanced soil and groundwater remediation processes, focusing on (i) surfactant adsorption on soil, (ii) micellar solubilization of organic hydrocarbons, (iii) supersolubilization, (iv) density modified displacement, (v) degradation of organic hydrocarbon in presence surfactants, (vi) partitioning of surfactants onto soil and liquid organic phase, (vii) partitioning of contaminants onto soil, and (viii) removal of organics from soil in presence of surfactants. Surfactant adsorption on soil and/or sediment is an important step in this process as it results in surfactant loss reduced the availability of the surfactants for solubilization. At the same time, adsorbed surfactants will retained in the soil matrix, and may create other environmental problem. The biosurfactants are become promising in this application due to their environmentally friendly nature, nontoxic, low adsorption on to soil, and good solubilization efficiency. Effects of different parameters like the effect of electrolyte, pH, soil mineral and organic content, soil composition etc. on surfactant adsorption are discussed here. Micellar solubilization is also an important step for removal of organic contaminants from the soil matrix, especially for low aqueous solubility organic contaminants. Influences of different parameters such as single and mixed surfactant system, hydrophilic and hydrophobic chain length, HLB value, temperature, electrolyte, surfactant type that are very important in micellar solubilization are reviewed here. Microemulsion systems show higher capacity of organic hydrocarbons solubilization than the normal micellar system. In the case of biodegradation of organic hydrocarbons, the rate is very slow due to low water solubility and dissolution rate but the presence of surfactants may increase the bioavailability of hydrophobic compounds by solubilization and hence increases the degradation rate. In some cases the presence of it also reduces the rate. In addition to fundamental studies, some laboratory and field studies on removal of organics from contaminated soil are also reviewed to show the applicability of this technology.

Santanu Paria

2008-01-01T23:59:59.000Z

396

Adaptive management: a paradigm for remediation of public facilities  

SciTech Connect

Public facility restoration planning traditionally focused on response to natural disasters and hazardous materials accidental releases. These plans now need to integrate response to terrorist actions. Therefore, plans must address a wide range of potential vulnerabilities. Similar types of broad remediation planning are needed for restoration of waste and hazardous material handling areas and facilities. There are strong similarities in damage results and remediation activities between unintentional and terrorist actions; however, the uncertainties associated with terrorist actions result in a re-evaluation of approaches to planning. Restoration of public facilities following a release of a hazardous material is inherently far more complex than in confined industrial settings and has many unique technical, economic, social, and political challenges. Therefore, they arguably involve a superset of drivers, concerns and public agencies compared to other restoration efforts. This superset of conditions increases complexity of interactions, reduces our knowledge of the initial conditions, and even condenses the timeline for restoration response. Therefore, evaluations of alternative restoration management approaches developed for responding to terrorist actions provide useful knowledge for large, complex waste management projects. Whereas present planning documents have substantial linearity in their organization, the 'adaptive management' paradigm provides a constructive parallel operations paradigm for restoration of facilities that anticipates and plans for uncertainty, multiple/simUltaneous public agency actions, and stakeholder participation. Adaptive management grew out of the need to manage and restore natural resources in highly complex and changing environments with limited knowledge about causal relationships and responses to restoration actions. Similarities between natural resource management and restoration of a facility and surrounding area(s) after a disruptive event suggest numerous advantages over preset linearly-structured plans by incorporating the flexibility and overlap of processes inherent in effective facility restoration. We discuss three restoration case studies (e.g., the Hart Senate Office Building anthrax restoration, Rocky Flats actinide remediation, and hurricane destruction restoration), that implement aspects of adaptive management but not a formal approach. We propose that more formal adoption of adaptive management principles could be a basis for more flexible standards to improve site-specific remediation plans under conditions of high uncertainty.

Janecky, David R [Los Alamos National Laboratory; Whicker, Jeffrey J [Los Alamos National Laboratory; Doerr, Ted B [NON LANL

2009-01-01T23:59:59.000Z

397

Raman spectroscopy of selected arsenates—implications for soil remediation  

Science Journals Connector (OSTI)

The contamination of soils with heavy metals such as As, Cr and Cu is of great importance; the remediation of such soils even more so. Arsenic compounds are prevalent in soils either through leaching of mine tailings, the use of Cu/Cr/As as a wood preservative or through the use of arsenic in cattle dips. The arsenic compounds in soils and leachates can be highly reactive and mobile, resulting in the formation of metal arsenate compounds. Of these compounds, one such set of minerals that can be formed is the vivianite arsenate minerals. Raman spectroscopy has been used to characterise the vivianite arsenates and to identify arsenic contaminants in a soil.

Ray L. Frost; Theo Kloprogge; Matthew L. Weier; Wayde N. Martens; Z. Ding; Howell G.H. Edwards

2003-01-01T23:59:59.000Z

398

Preliminary site characterization - final report  

SciTech Connect

This report summarizes the ecological unit reconnaissance conducted at the F-Area Burning/Rubble Pit(s) RCRA/CERCLA Unit (F-Area BRP) on August 30 and 31, 1993 as part of the RFI/RI baseline risk assessment for the waste unit The baseline risk assessment will assess the potential endangerment to human health and the environment associated with the unit and will be used to evaluate remediation criteria, if needed. The information presented in this report will be used in subsequent stages of the ecological risk assessment to refine the conceptual site model, assist in the selection of contaminants of concern, identify potential ecological receptors, and evaluate trophic relationships and other exposure pathways. The unit reconnaissance survey was conducted in accordance with Specification No. E-18272, Rev. 1 dated August 5, 1993, and the Draft {open_quotes}Ecological Risk Assessment Program Plan for Evaluation of Waste Sites on the Savannah River Site{close_quotes}. The objectives of the site reconnaissance were to: Assess the general characteristics of on-unit biological communities including mammals, birds, reptiles, amphibians, and any aquatic communities present. Determine the location, extent, and characteristics of on-unit ecological resources, such as forested areas and wetlands, that could serve as important wildlife habitat or provide other ecological functions. Identify any overt effects of contamination on biological communities. The field investigations included mapping and describing all wetland and terrestrial habitats; recording wildlife observations of birds, mammals, and reptiles; and investigating ecological resources in nearby downgradient and downstream areas which could be affected by mobile contaminants or future remedial actions. In preparation for the field investigation, existing unit information including aerial photographs and reports were reviewed to help identify and describe ecological resources at the waste unit.

Clark, D.; Smith, L.B.

1993-12-01T23:59:59.000Z

399

Mountaineer Commercial Scale Carbon Capture and Storage Project Topical Report: Preliminary Public Design Report  

SciTech Connect

This Preliminary Public Design Report consolidates for public use nonproprietary design information on the Mountaineer Commercial Scale Carbon Capture & Storage project. The report is based on the preliminary design information developed during the Phase I - Project Definition Phase, spanning the time period of February 1, 2010 through September 30, 2011. The report includes descriptions and/or discussions for: (1) DOE's Clean Coal Power Initiative, overall project & Phase I objectives, and the historical evolution of DOE and American Electric Power (AEP) sponsored projects leading to the current project; (2) Alstom's Chilled Ammonia Process (CAP) carbon capture retrofit technology and the carbon storage and monitoring system; (3) AEP's retrofit approach in terms of plant operational and integration philosophy; (4) The process island equipment and balance of plant systems for the CAP technology; (5) The carbon storage system, addressing injection wells, monitoring wells, system monitoring and controls logic philosophy; (6) Overall project estimate that includes the overnight cost estimate, cost escalation for future year expenditures, and major project risks that factored into the development of the risk based contingency; and (7) AEP's decision to suspend further work on the project at the end of Phase I, notwithstanding its assessment that the Alstom CAP technology is ready for commercial demonstration at the intended scale.

Guy Cerimele

2011-09-30T23:59:59.000Z

400

Scheduling the Remediation of Port Hope: Logistical and Regulatory Challenges of a Multiple Site Urban Remediation Project - 13119  

SciTech Connect

The Port Hope Project is part of the larger CAN$1.28 billion Port Hope Area Initiative (PHAI), a community-based program for the development and implementation of a safe, local, long-term management solution for historic Low-Level Radioactive Waste (LLRW) in the Municipalities of Port Hope and Clarington, Ontario, Canada. Atomic Energy of Canada (AECL) is the Project Proponent, Public Works and Government Services (PWGSC) is managing the procurement of services and the MMM Group Limited - Conestoga Rovers and Associates Joint Venture (MMM-CRA Joint Venture) is providing detailed design and construction oversight and administration services for the Project. The Port Hope Project includes the construction of a long-term waste management facility (LTWMF) in the Municipality of Port Hope and the remediation of 18 (eighteen) large-scale LLRW, numerous small-scale sites still being identified and industrial sites within the Municipality. The total volume to be remediated is over one million cubic metres and will come from sites that include temporary storage sites, ravines, beaches, parks, private commercial and residential properties and vacant industrial sites all within the urban area of Port Hope. Challenges that will need to be overcome during this 10 year project include: - Requirements stipulated by the Environmental Assessment (EA) that affect Project logistics and schedule. - Coordination of site remediation with the construction schedule at the LTWMF. - Physical constraints on transport routes and at sites affecting production rates. - Despite being an urban undertaking, seasonal constrains for birds and fish (i.e., nesting and spawning seasons). - Municipal considerations. - Site-specific constraints. - Site interdependencies exist requiring consideration in the schedule. Several sites require the use of an adjacent site for staging. (authors)

Ferguson Jones, Andrea; Lee, Angela [MMM Group Limited, 100 Commerce Valley Drive West, Thornhill, Ontario, L3T 0A1 (Canada)] [MMM Group Limited, 100 Commerce Valley Drive West, Thornhill, Ontario, L3T 0A1 (Canada); Palmeter, Tim [Public Works and Government Services Canada, 4900 Yonge Street, Toronto, Ontario, M2N 6A6 (Canada)] [Public Works and Government Services Canada, 4900 Yonge Street, Toronto, Ontario, M2N 6A6 (Canada)

2013-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "risk-based preliminary remediation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Review of the Vortec soil remediation demonstration program  

SciTech Connect

The principal objective of the METC/Vortec program is to develop and demonstrate the effectiveness of the Vortec CMS in remediating soils contaminated with hazardous materials and/or low levels of radionuclides. To convincingly demonstrate the CMS`s capability, a Demonstration Plant will be constructed and operated at a DOE site that has a need for the remediation of contamination soil. The following objectives will be met during the program: (1) establish the glass chemistry requirements to achieve vitrification of contaminated soils found at the selected DOE site; (2) complete the design of a fully integrated soil vitrification demonstration plant with a capacity to process 25 TPD of soil; (3) establish the cost of a fully integrated soil demonstration plant with a capacity to process 25 TPD of soil; (4) construct and operate a fully integrated demonstration plant; (5) analyze all influent and effluent streams to establish the partitioning of contaminants and to demonstrate compliance with all applicable health, safety, and environmental requirements; (6) demonstrate that the CMS technology has the capability to produce a vitrified product that will immobilize the hazardous and radionuclide materials consistent with the needs of the specific DOE waste repositories.

Patten, J.S.

1994-12-31T23:59:59.000Z

402

Technique for rapid establishment of American lotus in remediation efforts  

SciTech Connect

A technique for increasing the establishment rate of American lotus (Nelumbo lutea) and simplifying planting was developed as part of a pond remediation project. Lotus propagation techniques typically require scarification of the seed, germination in heated water, and planting in nursery containers. Then mature (~ 1 yr) nursery-grown stock is transferred to planting site or scarified seed are broadcast applied. Mature plants should grow more quickly, but can be sensitive to handling, require more time to plant, and cost more. Scarified seeds are easier to plant and inexpensive, but have a lag time in growth, can fail to germinate, and can be difficult to site precisely. We developed an intermediate technique using small burlap bags that makes planting easier, provides greater germination success, and avoids lag time in growth. Data on survival and growth from experiments using mature stock, scarified seeds, and bag lotus demonstrate that bag lotus grow rapidly in a variety of conditions, have a high survival rate, can be processed and planted easily and quickly, and are very suitable for a variety of remediation projects

Ryon, Michael G [ORNL; Fortner, Allison M [ORNL; Goins, Kenneth N [ORNL; Jett, Robert T [ORNL; McCracken, Kitty [ORNL; Morris, Gail Wright [ORNL; Riazzi, Adam [Lincoln County HS, Hamlin WV; Roy, W Kelly [ORNL

2013-01-01T23:59:59.000Z

403

Risk assessment in the DOE Assurance Program for Remedial Action  

SciTech Connect

This document provides information obtained during the performance of risk assessment tasks in support of the Assurance Program for Remedial Action (APRA) sponsored by the Office of Operational Safety of the Department of Energy. We have presented a method for the estimation of projected health effects at properties in the vicinity of uranium mill tailing piles due to transported tailings or emissions from the piles. Because radon and radon daughter exposure is identified as the principal factor contributing to health effects at such properties, the basis for estimating lung cancer risk as a result of such exposure is discussed in detail. Modeling of health risk due to a secondary pathway, ingestion of contaminated, home-grown food products, is also discussed since it is a potentially important additional source of exposure in certain geographic locations. Risk assessment methods used in various mill tailings reports are reviewed. The protocols for radiological surveys conducted in DOE-sponsored remedial action programs are critically reviewed with respect to their relevance to the needs of health risk estimation. The relevance of risk assessment to the APRA program is discussed briefly.

Marks, S.; Cross, F.T.; Denham, D.H.; Kennedy, W.E.; Stenner, R.D.

1985-08-01T23:59:59.000Z

404

Missouri State information handbook: formerly utilized sites remedial action program  

SciTech Connect

This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Missouri. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature chairmen, and a summary of recent relevant legislative action; a description of the organization and structure of local governments affected by remedial action at the St. Louis area sites; a summary of relevant local ordinances and regulations; an identification of relevant public interest groups; a list of radio stations, television stations, and newspapers that provide public information to the St. Louis area or to Jefferson City; and the full text of relevant statutes and regulations.

none,

1980-12-31T23:59:59.000Z

405

Preliminary  

NLE Websites -- All DOE Office Websites (Extended Search)

Beamline Development Policy May 25, 2011 Beamline Development Policy May 25, 2011 i NSLS-II Beamline Development Policy May 25, 2011 NSLS-II Beamline Development Policy May 25, 2011 ii TABLE OF CONTENTS ACRONYMS ........................................................................................................................................................... III APPROVALS .......................................................................................................................................................... IV CHANGE SYNOPSIS................................................................................................................................................. V

406

In-Situ Arsenic Remediation in Carson Valley, Douglas County, West-Central Nevada  

E-Print Network (OSTI)

In-Situ Arsenic Remediation in Carson Valley, Douglas County, West-Central Nevada Scientific in Carson Valley, Douglas County, West-Central Nevada By Angela P. Paul, Douglas K. Maurer, Kenneth G.G., and Welch, A.H., 2010, In-situ arsenic remediation in Carson Valley, Douglas County, west-central Nevada: U

407

Consequences of propene and propane on plasma remediation of NOx Rajesh Doraia)  

E-Print Network (OSTI)

. INTRODUCTION Plasma remediation of exhaust from internal combustion engines, and diesel engines in particular of achieving high E/N electric field/ gas number density are promising in this regard.11 Actual diesel exhaust discharge DBD reactors are being investigated for plasma remediation of NOx from the exhaust of internal

Kushner, Mark

408

Remediation of old environmental liabilities in the Nuclear Research Institute Rez plc  

SciTech Connect

The Nuclear Research Institute Rez plc (NRI) is a leading institution in all areas of nuclear R and D in the Czech Republic. The NRI's activity encompasses nuclear physics, chemistry, nuclear power, experiments at research nuclear reactors and many other topics. The NRI operates two research nuclear reactors, many facilities as a hot cell facility, research laboratories, technology for radioactive waste (RAW) management, radionuclide irradiators, an electron accelerator, etc. After 50 years of activities in the nuclear field, there are some environmental liabilities that shall be remedied in the NRI. There are three areas of remediation: (1) decommissioning of old obsolete facilities (e.g. decay tanks, RAW treatment technology, special sewage system), (2) treatment of RAW from operation and dismantling of nuclear facilities, and (3) elimination of spent fuel from research nuclear reactors operated by the NRI. The goal is to remedy the environmental liabilities and eliminate the potential negative impact on the environment. Based on this postulate, optimal remedial actions have been selected and recommended for the environmental remediation. Remediation of the environmental liabilities started in 2003 and will be finished in 2012. Some liabilities have already been successfully remedied. The most significant items of environmental liabilities are described in the paper together with information about the history, the current state, the progress, and the future activities in the field of remediation of environmental liabilities in the NRI. (authors)

Podlaha, J. [Nuclear Research Institute Rez plc (Czech Republic)

2007-07-01T23:59:59.000Z

409

Microstreamer dynamics during plasma remediation of NO using atmospheric pressure dielectric barrier discharges  

E-Print Network (OSTI)

Microstreamer dynamics during plasma remediation of NO using atmospheric pressure dielectric- ate toxins from atmospheric pressure gas streams. Plasma remediation is one technique which has been methods for the removal of oxides of nitrogen NxOy from atmospheric gas streams and among those techniques

Kushner, Mark

410

Geophysical Monitoring of Foam used to Deliver Remediation1 Treatments within the Vadose Zone2  

E-Print Network (OSTI)

for transport of pollutants from the ground surface37 to ground water. Contaminants in the vadose zone1 Geophysical Monitoring of Foam used to Deliver Remediation1 Treatments within the Vadose Zone2 3 amendments into the vadose zone for in situ11 remediation; it is an approach being considered for in situ

Hubbard, Susan

411

Supplemental Groundwater Remediation Technologies to Protect the Columbia River at the Hanford Site, Washington - An Update  

SciTech Connect

This paper provides an update on supplemental groundwater remediation technologies to protect the Columbia River at the Hanford Site in Washington State. Major groundwater contaminants at the Hanford Site are described, along with the technologies and remedial activities that will address these environmental challenges.

Thompson, K. M.; Rowley, R. B.; Petersen, Scott W.; Fruchter, Jonathan S.

2008-06-02T23:59:59.000Z

412

PCB Concentration in Fish in a River System after Remediation of Contaminated Sediment  

Science Journals Connector (OSTI)

An 1991 investigation of PCB concentrations in water and fish along a river was repeated in 1996 after the completion of a remediation of PCB-containing sediment in a lake within the river system. ... The results indicated, that changes in background exposure must be taken into account when evaluating the success of remedial actions measures carried out over several years. ...

Gudrun Bremle; Per Larsson

1998-09-30T23:59:59.000Z

413

VEGETATED ROOFS FOR URBAN ECOSYSTEM REMEDIATION: PERFORMANCE AND POLICY IN THE TANYARD BRANCH WATERSHED  

E-Print Network (OSTI)

VEGETATED ROOFS FOR URBAN ECOSYSTEM REMEDIATION: PERFORMANCE AND POLICY IN THE TANYARD BRANCH their environmental impact, innovative practices must be developed that replace ecosystem services lost during systems for urban ecosystem remediation. The stormwater retention performance of a thin-layer green roof

Rosemond, Amy Daum

414

A Regional Perspective on Contaminated Site Remediation—Fate of Materials and Pollutants  

Science Journals Connector (OSTI)

A Regional Perspective on Contaminated Site Remediation—Fate of Materials and Pollutants ... Other innovative treatment technologies such as bioremediation showed a decreasing trend, although they could be very effective treatment alternatives for PHCs (6). ... Anderson, W. C. Innovative Site Remediation Technology. ...

1999-07-15T23:59:59.000Z

415

Nuclear facility decommissioning and site remedial actions. Volume 6. A selected bibliography  

SciTech Connect

This bibliography of 683 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the sixth in a series of annual reports prepared for the US Department of Energy's Remedial Action Programs. Foreign as well as domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's remedial action program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Facilities Contaminated with Natural Radioactivity; (5) Uranium Mill Tailings Remedial Action Program; (6) Grand Junction Remedial Action Program; (7) Uranium Mill Tailings Management; (8) Technical Measurements Center; and (9) General Remedial Action Program Studies. Chapter sections for chapters 1, 2, 5, and 7 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate affiliation or by publication description.

Owen, P.T.; Michelson, D.C.; Knox, N.P.

1985-09-01T23:59:59.000Z

416

APS Preliminary Beamline Design Report Guide  

NLE Websites -- All DOE Office Websites (Extended Search)

PRELIMINARY BEAMLINE DESIGN REPORT PRELIMINARY BEAMLINE DESIGN REPORT December 5, 1994 5.1 Preliminary Beamline Design: General Guidelines The Preliminary Design of the beamline represents an approximately 30% design level of each of the beamline components. This level of design permits the CAT to develop cost estimates for the construction of the beamline, as well as a realistic timeline for completion of the construction tasks. A committee from the APS has been charged with reviewing the Preliminary Design Reports and has established the evaluation criteria described below. The Preliminary Beamline Report is expected to expand upon the Conceptual Design Report in the following areas: Beamline Layout Component Design Work Breakdown Structure Cost and Schedule Additional Operational Requirements

417

Scientists decipher genome of bacterium that remediates uranium contamination, generates electricity Public release date: 11-Dec-2003  

E-Print Network (OSTI)

a microbe's capability to generate electricity and to help clean up radioactive contamination, scientistsScientists decipher genome of bacterium that remediates uranium contamination, generates that remediates uranium contamination, generates electricity Analysis of Geobacter sulfurreducens genes reveals

Lovley, Derek

418

Preliminary Notice of Violation, Fluor Hanford, Incorporated...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Hanford, Incorporated - EA-2002-03 Preliminary Notice of Violation, Fluor Hanford, Incorporated - EA-2002-03 August 12, 2002 Issued to Fluor Hanford, Incorporated, related to...

419

Preliminary Notice of Violation, Fluor Hanford Incorporated ...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Hanford Incorporated - EA-2005-07 Preliminary Notice of Violation, Fluor Hanford Incorporated - EA-2005-07 December 16, 2005 Issued to Fluor Hanford, Incorporated, related to...

420

Preliminary Notice of Violation, Sandia National Laboratories...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

provides information related to a Preliminary Notice of Violation issued by the National Nuclear Security Administration to Sandia Corporation on June 1, 2010, for violations of...

Note: This page contains sample records for the topic "risk-based preliminary remediation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Preliminary Notice of Violation, Lawrence Livermore National...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Lawrence Livermore National Laboratory, (EA-2003-04) On September 3, 2003, the National Nuclear Security Administration issued a Preliminary Notice of Violation (EA-2003-04) to...

422

2014 Energy Storage Peer Review- Preliminary Agenda  

Energy.gov (U.S. Department of Energy (DOE))

The 2014 Energy Storage Peer Review will be held September 19-19, 2014, in Washington, DC. The preliminary agenda is available for downloading.

423

Preliminary Notice of Violation, National Security Technologies...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

a Preliminary Notice of Violation (SEA-2014-02) to National Security Technologies, LLC (NSTec), for violations of Department of Energy's classified information security program...

424

Title Preliminary Assessment of Geothermal Potential Author  

National Nuclear Security Administration (NNSA)

NTSEIS ADMINISTRATIVE RECORD PRELIMINARY ASSESSMENT OF GEOTHERMAL POTENTIAL NEVADA TEST SITE j NYE COUNTY, NEVADA Prepared for: UNITED STATES DEPARTMENT OF ENERGY Prepared by:...

425

Preliminary Notice of Violation, Brookhaven Science Associates...  

Office of Environmental Management (EM)

Associates, LLC - WEA-2013-01 Preliminary Notice of Violation, Brookhaven Science Associates, LLC - WEA-2013-01 August 29, 2013 Issued to Brookhaven Science Associates, LLC,...

426

Preliminary Notice of Violation, Brookhaven Science Associates...  

Office of Environmental Management (EM)

Associates - EA-1999-02 Preliminary Notice of Violation, Brookhaven Science Associates - EA-1999-02 April 15, 1999 Issued to Brookhaven Science Associates related to Radiological...

427

Preliminary Notice of Violation, Sandia Corporation - September...  

Office of Environmental Management (EM)

Sandia Corporation - September 25, 2014 September 25, 2014 Worker Safety and Health Enforcement Preliminary Notice of Violation issued to Sandia Corporation. On September...

428

Preliminary Notice of Violation, Lawrence Livermore National...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

National Security, LLC - September 25, 2014 September 25, 2014 Worker Safety and Health Enforcement Preliminary Notice of Violation issued to Lawrence Livermore National...

429

Preliminary Release: March 28, 2011",,,,,,,,,,,,"Released: April...  

U.S. Energy Information Administration (EIA) Indexed Site

Energy Consumption Survey: Final Housing Characteristics Tables" "Preliminary Release: March 28, 2011" "Final Release: April 2013" "Table HC5.6 Computers and Other Electronics in...

430

AHRI Preliminary Plan for Retrospective Analysis | Department...  

Energy Savers (EERE)

Existing Rules Air-Conditioning, Heating, and Refrigeration Institute (AHRI) Regulatory Burden RFI A.O. Smith Corporation Response to Preliminary Plan for Retrospective Analysis of...

431

Preliminary Notice of Violation, LATA Environmental Services...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

More Documents & Publications Preliminary Notice of Violation, Battelle Energy Alliance, LLC - NEA-2012-01 Notice of Violation, Battelle Energy Alliance, LLC - WEA-2008-01...

432

Innovative fossil fuel fired vitrification technology for soil remediation. Volume 1, Phase 1: Annual report, September 28, 1992--August 31, 1993  

SciTech Connect

Vortex has successfully completed Phase 1 of the ``Innovative Fossil Fuel Fired Vitrification Technology for Soil Remediation`` program with the Department of Energy (DOE) Morgantown Energy Technology Center (METC). The Combustion and Melting System (CMS) has processed 7000 pounds of material representative of contaminated soil that is found at DOE sites. The soil was spiked with Resource Conversation and Recovery Act (RCRA) metals surrogates, an organic contaminant, and a surrogate radionuclide. The samples taken during the tests confirmed that virtually all of the radionuclide was retained in the glass and that it did not leach to the environment. The organic contaminant, anthracene, was destroyed during the test with a Destruction and Removal Efficiency (DRE) of at least 99.99%. RCRA metal surrogates, that were in the vitrified product, were retained and will not leach to the environment--as confirmed by the TCLP testing. Semi-volatile RCRA metal surrogates were captured by the Air Pollution Control (APC) system, and data on the amount of metal oxide particulate and the chemical composition of the particulate were established for use in the Phase 2 APC system design. This topical report will present a summary of the activities conducted during Phase 1 of the ``Innovative Fossil Fuel Fired Vitrification Technology for Soil Remediation`` program. The report includes the detail technical data generated during the experimental program and the design and cost data for the preliminary Phase 2 plant.

Not Available

1993-08-01T23:59:59.000Z

433

The Use of Ecological Restoration Principles To Achieve Remedy Protection at the Fernald Preserve and Weldon Spring Sites  

Energy.gov (U.S. Department of Energy (DOE))

The Use of Ecological Restoration Principles To Achieve Remedy Protection at the Fernald Preserve and Weldon Spring Sites

434

Independent Oversight Review, Richland Operations Office and CH2M Hill Plateau Remediation Company and Mission Support Alliance- April 2012  

Energy.gov (U.S. Department of Energy (DOE))

Review of Richland Operations Office and CH2M Hill Plateau Remediation Company and Mission Support Alliance Conduct of Operations

435

PORFLOW MODELING FOR A PRELIMINARY ASSESSMENT OF THE PERFORMANCE OF NEW SALTSTONE DISPOSAL UNIT DESIGNS  

SciTech Connect

At the request of Savannah River Remediation (SRR), SRNL has analyzed the expected performance obtained from using seven 32 million gallon Saltstone Disposal Units (SDUs) in the Z-Area Saltstone Disposal Facility (SDF) to store future saltstone grout. The analysis was based on preliminary SDU final design specifications. The analysis used PORFLOW modeling to calculate the release of 20 radionuclides from an SDU and transport of the radionuclides and daughters through the vadose zone. Results from this vadose zone analysis were combined with previously calculated releases from existing saltstone vaults and FDCs and a second PORFLOW model run to calculate aquifer transport to assessment points located along a boundary 100 m from the nearest edge of the SDF sources. Peak concentrations within 12 sectors spaced along the 100 m boundary were determined over a period of evaluation extending 20,000 years after SDF closure cap placement. These peak concentrations were provided to SRR to use as input for dose calculations.

Smith, F.

2012-08-06T23:59:59.000Z

436

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

CONTENTS CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES ii Pa e -5 1 : 2 2 4 ELIMINATION REPORT THE FORMER VIRGINIA-CAROLINA CHEMICAL CORPORATION RICHMOND, VIRGINIA INTROUUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decommissioning Projects (and/or predecessor agencies, offices and divisions, has reviewed the past activities of the Atomic Energy Commission (AEC) at the former Virginia-Carolina Chemical Corporation, Richmond, Virginia. On the basis of historical information, DOE has determined that any radioactive material potentially remaining from these activities would be insignificant in terms of both its quantity and the hazard it would

437

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

. . CONTENTS INTROOUCTION BACKGROUND Site Function Site Description Radiological History,and Status ELIMINATION ANALYSIS REFERENCES 9 1 1 2 2 2 4 ii ELIMINATION REPORT THE FORMER VIRGINIA-CAROLINA CHEMICAL CORPORATION RICHMOND. VIRGINIA INTROLJUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of ,Remedial Action and Waste Technology, Division of Facility and Site Deconunissioning Projects (and/or predecessor agencies, offices and divisions, has reviewed the past activities of the Atomic Energy Carmission (AEC) at the former Virginia-Carolina Chemical Corporation, Richmond, Virginia. On the basis of historical information, DOE has determined that any radioactive material potentially remaining from these activities would oe insignificant in terms of both its quantity and the hazard it would

438

UC-70A Formerly Utilized Sites Remedial Action Program (FUSRAP)  

Office of Legacy Management (LM)

F. a% F. a% .~~~~~~":~,~~~~,~. .-+smiii"-l ," ^.-. _ _I ,a ,' ~, *p2 - QRkl~ oR,o~ DOE/OR/20722- 29 UC-70A Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DE-ACO5-81OR20722 CI c F c F F c CI c c F P RADIOLOGICAL SURVEY OF THE ALBANY RESEARCH CENTER Albany, O regon Bechtel National, inc. Advanced Technology Division L- ..^___ ~. _ .._.. -.~~_-- ._ ._.. .._ .^.". January 1985 Technical information Center Office of Scientific and Technical Information U.S. Department of Energy LEGAL NOTICE This report was prepared as an account of work sponsored by the United States Government. Neither the United States nor the United States Department of Energy, nor any of their employees, nor any of their contractors, subcontractors, or their employees, makes any warranty, express or implied,

439

Remedial Action Certification Docket - Sodium Reactor Experiment (SRE)  

Office of Legacy Management (LM)

c~-?i-- c~-?i-- I ,3-l Remedial Action Certification Docket - Sodium Reactor Experiment (SRE) .Complex and the Hot Cave Facility (Bldg. 003), Santa Susana ,Fie!d Laboratory, Chatsworth, California ..:'..~::Yerlette Gatl in, MA-232 I am attaching for entry into the Public Document Room, one copy of the N -23 subject documentat ion. These documents are the backup data for the certification that the facilfties are radiologically acceptable for b- unrestricted use as noted in the certification statement published in the &aney Federal Register. Inasmuch as the certification for unrestricted use is 9/2(/85 being published in the Federal Register, it is prudent that the attached documentation also be available to the public. These documents should be retained In accordance with DOE Order 1324.2--disposal schedule 25.

440

Tank waste remediation system systems engineering management plan  

SciTech Connect

This Systems Engineering Management Plan (SEMP) describes the Tank Waste Remediation System (TWRS) implementation of the US Department of Energy (DOE) systems engineering policy provided in 97-IMSD-193. The SEMP defines the products, process, organization, and procedures used by the TWRS Project to implement the policy. The SEMP will be used as the basis for tailoring the systems engineering applications to the development of the physical systems and processes necessary to achieve the desired end states of the program. It is a living document that will be revised as necessary to reflect changes in systems engineering guidance as the program evolves. The US Department of Energy-Headquarters has issued program management guidance, DOE Order 430. 1, Life Cycle Asset Management, and associated Good Practice Guides that include substantial systems engineering guidance.

Peck, L.G.

1998-01-08T23:59:59.000Z

Note: This page contains sample records for the topic "risk-based preliminary remediation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Massachusetts state information handbook: formerly utilized sites remedial action program  

SciTech Connect

This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of Massachusetts. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full text of relevant statutes and regulations.

None

1981-02-09T23:59:59.000Z

442

Technology needs for remediation: Hanford and other DOE sites  

SciTech Connect

Technologies are being developed under the Buried Waste Integrated Demonstration (BWID) program to facilitate remediation of the US Department of Energy's (DOE) buried and stored low-level radioactive, transuranic (TRU), and mixed radioactive and hazardous buried wastes. The BWID program is being coordinated by the Idaho National Engineering Laboratory (INEL) in southeastern Idaho, a DOE site that has large volumes of buried radioactive wastes. The program is currently focusing its efforts on the problems at INEL's Subsurface Disposal Area (SDA) of the Radioactive Waste Management Complex (RWMC). As specific technologies are successfully demonstrated, they will be available for transfer to applications at other DOE buried waste sites. The purpose of this study is to present buried waste technology needs that have been identified for DOE sites other than INEL.

Stapp, D.C.

1993-01-01T23:59:59.000Z

443

Florida state information handbook: formerly utilized sites remedial action program  

SciTech Connect

This volume is one of a series produced under contract with DOE, Office of Nuclear Waste Management, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the federal and state levels, the pertinent programs they administer, each affected state legislature, and current federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Florida. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

None

1981-02-27T23:59:59.000Z

444

Oregon state information handbook: formerly utilized sites remedial action program  

SciTech Connect

This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Oregon. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

none,

1980-12-31T23:59:59.000Z

445

Maryland State information handbook: formerly utilized sites remedial action program  

SciTech Connect

This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Handbook Series Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Maryland. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

none,

1980-12-31T23:59:59.000Z

446

Enhancement of in situ microbial remediation of aquifers  

DOE Patents (OSTI)

Methods are provided for remediating subsurface areas contaminated by toxic organic compounds. An innocuous oil, such as vegetable oil, mineral oil, or other immiscible organic liquid, is introduced into the contaminated area and permitted to move therethrough. The oil concentrates or strips the organic contaminants, such that the concentration of the contaminants is reduced and such contaminants are available to be either pumped out of the subsurface area or metabolized by microorganisms. Microorganisms may be introduced into the contaminated area to effect bioremediation of the contamination. The methods may be adapted to deliver microorganisms, enzymes, nutrients and electron donors to subsurface zones contaminated by nitrate in order to stimulate or enhance denitrification. 4 figures.

Fredrickson, J.K.; Brockman, F.J.; Streile, G.P.; Cary, J.W.; McBride, J.F.

1993-11-30T23:59:59.000Z

447

Oregon state information handbook formerly utilized sites remedial action program  

SciTech Connect

This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administater, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Oregon. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

none,

1980-12-31T23:59:59.000Z

448

California state information handbook: formerly utilized sites remedial action program  

SciTech Connect

This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of California. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full text of relevant statutes and regulations.

none,

1981-02-09T23:59:59.000Z

449

DOE/EA-1155 Uranium Mill Tailing Remedial Action Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

55 55 Uranium Mill Tailing Remedial Action Project Environmental Assessment of Ground- Water Compliance Activities At the Uranium Mill Tailings Site Spook, Wyoming February 1997 Prepared by U.S. Department of Energy Albuquerque Operations Office Grand Junction Office This page intentionally blank : illegible Portions of tbis DISCLAIMER document may be in electronic image products. Images are produced fiom the best available original dOClMXlf?IlL DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, make any warranty, express or implied, or assumes any legal liabili- ty or responsibility for the accuracy, completeness,

450

Summary of the landfill remediation problems and technology needs of the Oak Ridge Reservation Environmental Restoration Programs  

SciTech Connect

This report discusses the following topics: brief description of the Oak Ridge Reservation Environmental Restoration Program; descriptions of representative waste burials at each site; ongoing, planned, or potential remediation; known or anticipated remediation problems; potential applications for robotics in the remediation of Oak Ridge Reservation landfills.

Not Available

1991-01-01T23:59:59.000Z

451

NGWA.org Ground Water Monitoring & Remediation 00, no. 0/ xxxx 0000/pages 0000 1 2012, The Author(s)  

E-Print Network (OSTI)

NGWA.org Ground Water Monitoring & Remediation 00, no. 0/ xxxx 0000/pages 00­00 1 © 2012, The Author(s) Ground Water Monitoring & Remediation © 2012, National Ground Water Association. doi: 10.1111/j). Bioaugmentation remediation methods that employ Dehalococcoides sp. (DHC) have been widely tested for treating

Clement, Prabhakar

452

Remedial Investigation of UMore Park East, Dakota County, Minnesota Minnesota Pollution Control Agency and University of Minnesota  

E-Print Network (OSTI)

Remedial Investigation of UMore Park East, Dakota County, Minnesota Minnesota Pollution Control Control Agency 6:45 Remedial Investigation of UMore Park East ­ Jim Eidem, Project Manager, Barr Engineering Description of the UMore East Remedial Investigation process Summary of findings 7:05 Next steps

Netoff, Theoden

453

Investigating habitat value to inform contaminant remediation options: Approach  

Science Journals Connector (OSTI)

Habitat valuation methods are most often developed and used to prioritize candidate lands for conservation. In this study the intent of habitat valuation was to inform the decision-making process for remediation of chemical contaminants on specific lands or surface water bodies. Methods were developed to summarize dimensions of habitat value for six representative aquatic and terrestrial contaminated sites at the East Tennessee Technology Park (ETTP) on the US Department of Energy Oak Ridge Reservation in Oak Ridge, TN, USA. Several general valuation metrics were developed for three broad categories: site use by groups of organisms, site rarity, and use value added from spatial context. Examples of use value metrics are taxa richness, a direct measure of number of species that inhabit an area, complexity of habitat structure, an indirect measure of potential number of species that may use the area, and land use designation, a measure of the length of time that the area will be available for use. Measures of rarity included presence of rare species or communities. Examples of metrics for habitat use value added from spatial context included similarity or complementarity of neighboring habitat patches and presence of habitat corridors. More specific metrics were developed for groups of organisms in contaminated streams, ponds, and terrestrial ecosystems. For each of these metrics, cutoff values for high, medium, and low habitat value were suggested, based on available information on distributions of organisms and landscape features, as well as habitat use information. A companion paper describes the implementation of these habitat valuation metrics and scoring criteria in the remedial investigation for ETTP.

Rebecca A. Efroymson; Mark J. Peterson; Christopher J. Welsh; Daniel L. Druckenbrod; Michael G. Ryon; John G. Smith; William W. Hargrove; Neil R. Giffen; W. Kelly Roy; Harry D. Quarles

2008-01-01T23:59:59.000Z

454

Investigating Habitat Value in Support of Contaminant Remediation Decisions: Approach  

SciTech Connect

Habitat valuation methods are most often developed and used to prioritize candidate lands for conservation. In this study the intent of habitat valuation was to inform the decision-making process for remediation of chemical contaminants on specific lands or surface water bodies. Methods were developed to summarize dimensions of habitat value for six representative aquatic and terrestrial contaminated sites at the East Tennessee Technology Park (ETTP) on the US Department of Energy Oak Ridge Reservation in Oak Ridge, TN, USA. Several general valuation metrics were developed for three broad categories: site use by groups of organisms, site rarity, and use value added from spatial context. Examples of use value metrics are taxa richness, a direct measure of number of species that inhabit an area, complexity of habitat structure, an indirect measure of potential number of species that may use the area, and land use designation, a measure of the length of time that the area will be available for use. Measures of rarity included presence of rare species or communities. Examples of metrics for habitat use value added from spatial context included similarity or complementarity of neighboring habitat patches and presence of habitat corridors. More specific metrics were developed for groups of organisms in contaminated streams, ponds, and terrestrial ecosystems. For each of these metrics, cutoff values for high, medium, and low habitat value were suggested, based on available information on distributions of organisms and landscape features, as well as habitat use information. A companion paper describes the implementation of these habitat valuation metrics and scoring criteria in the remedial investigation for ETTP.

Efroymson, Rebecca Ann [ORNL; Peterson, Mark J [ORNL; Welsh, Christopher John Edward [ORNL; Druckenbrod, Daniel L [ORNL; Ryon, Michael G [ORNL; Smith, John G [ORNL; Hargrove, William Walter [ORNL; Giffen, Neil R [ORNL; Roy, W Kelly [ORNL; Quarles III, Harry Dewitt [ORNL

2008-01-01T23:59:59.000Z

455

Ecological effects of contaminants and remedial actions in Bear Creek  

SciTech Connect

Ecological studies of the Bear Creek watershed, which drains the area surrounding several Oak Ridge Y-12 Plant waste disposal facilities, were initiated in May 1984 and are continuing at present. These studies consisted of an initial, detailed characterization of the benthic invertebrate and fish communities in Bear Creek, and they were followed by a presently ongoing monitoring phase that involves reduced sampling intensities. The characterization phase utilized two approaches: (1) instream sampling of benthic invertebrate and fish communities in Bear Creek to identify spatial and temporal patterns in distribution and abundance and (2) laboratory bioassays on water samples from Bear Creek and selected tributaries to identify potential sources of toxicity to biota. The monitoring phase of the ecological program relates to the long-term goals of identifying and prioritizing contaminant sources and assessing the effectiveness of remedial actions. It continues activities of the characterization phase at less frequent intervals. The Bear Greek Valley is a watershed that drains the area surrounding several closed Oak Ridge Y-12 Plant waste disposal facilities. Past waste disposal practices in Bear Creek Valley resulted in contamination of Bear Creek and consequent ecological damage. Extensive remedial actions have been proposed at waste sites, and some of the have been implemented or are now underway. The proposed study plan consists of an initial, detailed characterization of the benthic invertebrate and fish communities in Bear Creek in the first year followed by a reduction in sampling intensity during the monitoring phase of the plan. The results of sampling conducted from May 1984 through early 1989 are presented in this report.

Southworth, G.R.; Loar, J.M.; Ryon, M.G.; Smith, J.G.; Stewart, A.J. [Oak Ridge National Lab., TN (United States); Burris, J.A. [C. E. Environmental, Inc., Tallahassee, FL (United States)

1992-01-01T23:59:59.000Z

456

Scientific Opportunity to Reduce Risk in Groundwater and Soil Remediation  

SciTech Connect

In this report, we start by examining previous efforts at linking science and DOE EM research with cleanup activities. Many of these efforts were initiated by creating science and technology roadmaps. A recurring feature of successfully implementing these roadmaps into EM applied research efforts and successful cleanup is the focus on integration. Such integration takes many forms, ranging from combining information generated by various scientific disciplines, to providing technical expertise to facilitate successful application of novel technology, to bringing the resources and creativity of many to address the common goal of moving EM cleanup forward. Successful projects identify and focus research efforts on addressing the problems and challenges that are causing “failure” in actual cleanup activities. In this way, basic and applied science resources are used strategically to address the particular unknowns that are barriers to cleanup. The brief descriptions of the Office of Science basic (Environmental Remediation Science Program [ERSP]) and EM’s applied (Groundwater and Soil Remediation Program) research programs in subsurface science provide context to the five “crosscutting” themes that have been developed in this strategic planning effort. To address these challenges and opportunities, a tiered systematic approach is proposed that leverages basic science investments with new applied research investments from the DOE Office of Engineering and Technology within the framework of the identified basic science and applied research crosscutting themes. These themes are evident in the initial portfolio of initiatives in the EM groundwater and soil cleanup multi-year program plan. As stated in a companion document for tank waste processing (Bredt et al. 2008), in addition to achieving its mission, DOE EM is experiencing a fundamental shift in philosophy from driving to closure to enabling the long-term needs of DOE and the nation.

Pierce, Eric M.; Freshley, Mark D.; Hubbard, Susan S.; Looney, Brian B.; Zachara, John M.; Liang, Liyuan; Lesmes, D.; Chamberlain, G. M.; Skubal, Karen L.; Adams, V.; Denham, Miles E.; Wellman, Dawn M.

2009-08-25T23:59:59.000Z

457

Use of hazard assessments to support risk-based decision making in the US Department of Energy Stockpile Stewardship (SS-21) Program  

SciTech Connect

This paper summarizes the nuclear explosive hazard assessment activities performed to support the US Department of Energy (DOE) Stockpile Stewardship (SS-21) Integrated Safety or ``Seamless Safety`` program. Past practice within the DOE Complex dictated the use of a significant number of post-design/ fabrication safety reviews to analyze the safety associated with operations on nuclear explosives and to answer safety questions. These practices have focused on reviewing-in or auditing-in safety vs incorporating safety in the design process. SS-21 was proposed by the DOE as an avenue to develop a program to ``integrate established, recognized, verifiable safety criteria into the process at the design stage rather than continuing the reliance on reviews, evaluations and audits.`` The cornerstone of the SS-21 design process is the hazard assessment, which is performed concurrently with process and tooling design. The hazard assessment is used as the key management tool to guide overall risk management associated with the nuclear explosive activity through supporting risk-based decisions made with respect to process design.

Fischer, S.R.; Konkel, H.; Rainbolt, M.

1996-04-01T23:59:59.000Z

458

The role of historical operations information for supporting remedial investigation work at the former Harshaw Chemical Site - 8279.  

SciTech Connect

In the early stages of hazardous, toxic, and radioactive waste (HTRW) site investigations, basic record searches are performed to help direct the agencies investigating contaminated sites to areas of concern and to identify contaminants of interest (COI). Plans developed on the basis of this preliminary research alone are often incomplete and result in unexpected discoveries either while in the field investigating the site or after the reports have been written. Many of the sites investigated under the Formerly Utilized Sites Remedial Action program (FUSRAP) have complex histories that are slowly uncovered over the life of the project. Because of programmatic constraints, nuances of these sites are often discovered late in their programs and result in increased expenditures in order to fully characterize the site, perform a robust feasibility study, and recommend appropriate alternatives for remediation. By identifying resources for public records, classified records, historic aerial photographs, and other sources of site-specific historical information, a process can be established to optimize the collection of information and to develop efficient and complete project plans. In many cases, interviews with past site employees are very useful tools. In combining what is found in the records, observed on historic aerial photographs, and heard from former employees and family members, teams investigating these sites can begin to compile sound and more complete conceptual site models (CSMs). The former Harshaw Chemical Site (HCS) illustrates this discovery process. HCS is part of FUSRAP. Preliminary investigations by the US Department of Energy (DOE) in the 1970s provided an initial CSM of activities that had taken place that may have resulted in contamination. The remedial investigation (RI) conducted by the US Army Corps of Engineers (USACE) was designed around this CSM. The RI work, however, identified a number of site conditions that were unexpected, including new potential COI associated with recycled uranium and contaminant locations that were inconsistent with the original CSM. As part of an RI Addendum effort, the USACE reconsidered its understanding of HCS historical activities. This effort included an intensive review of available historical aerial photography, an in-depth Potentially Responsible Parties (PRP) investigation, additional analysis of the production processes in place at HCS, and targeted supplemental data collection. The result of this effort was a revised CSM that included a number of previously unidentified potential COI and a much clearer understanding of the processes and resulting waste streams potentially associated with environmental contamination. Because of their complex and often poorly documented operational histories, unexpected discoveries will always be a part of investigating sites such as HCS. Taking advantage of available resources and expending funds for thorough historical research early in the life of a project will help to reduce the chances for expensive field remobilizations and significant schedule delays. A complete and accurate site history also allows for more efficient long-term technical and budgetary planning, thus eliminating many obstacles associated with the ultimate disposition of HTRW sites.

Johnson, R.; Peterson, J.; Picel, K.; Kolhoff, A.; Devaughn, J.; Environmental Science Division; U. S.Army Corps of Engineers, Buffalo District; Science Applications International Corp.

2008-01-01T23:59:59.000Z

459

The Role of Historical Operations Information for Supporting Remedial Investigation Work at the Former Harshaw Chemical Site  

SciTech Connect

In the early stages of hazardous, toxic, and radioactive waste (HTRW) site investigations, basic record searches are performed to help direct the agencies investigating contaminated sites to areas of concern and to identify contaminants of interest (COI). Plans developed on the basis of this preliminary research alone are often incomplete and result in unexpected discoveries either while in the field investigating the site or after the reports have been written. Many of the sites investigated under the Formerly Utilized Sites Remedial Action Program (FUSRAP) have complex histories that are slowly uncovered over the life of the project. Because of programmatic constraints, nuances of these sites are often discovered late in their programs and result in increased expenditures in order to fully characterize the site, perform a robust feasibility study, and recommend appropriate alternatives for remediation. By identifying resources for public records, classified records, historic aerial photographs, and other sources of site-specific historical information, a process can be established to optimize the collection of information and to develop efficient and complete project plans. In many cases, interviews with past site employees are very useful tools. In combining what is found in the records, observed on historic aerial photographs, and heard from former employees and family members, teams investigating these sites can begin to compile sound and more complete conceptual site models (CSM(s). The former Harshaw Chemical Site (HCS) illustrates this discovery process. HCS is part of FUSRAP. Preliminary investigations by the U.S. Department of Energy (DOE) in the 1970's provided an initial CSM of activities that had taken place that may have resulted in contamination. The remedial investigation (RI) conducted by the U.S. Army Corps of Engineers (USACE) was designed around this CSM. The RI work, however, identified a number of site conditions that were unexpected, including new potential COI associated with recycled uranium and contaminant locations that were inconsistent with the original CSM. As part of an RI Addendum effort, the USACE reconsidered its understanding of HCS historical activities. This effort included an intensive review of available historical aerial photography, an in-depth Potentially Responsible Parties (PRP) investigation, additional analysis of the production processes in place at HCS, and targeted supplemental data collection. The result of this effort was a revised CSM that included a number of previously unidentified potential COI and a much clearer understanding of the processes and resulting waste streams potentially associated with environmental contamination. Because of their complex and often poorly documented operational histories, unexpected discoveries will always be a part of investigating sites such as HCS. Taking advantage of available resources and expending funds for thorough historical research early in the life of a project will help to reduce the chances for expensive field re-mobilizations and significant schedule delays. A complete and accurate site history also allows for more efficient long-term technical and budgetary planning, thus eliminating many obstacles associated with the ultimate disposition of HTRW sites. (authors)

Kolhoff, A. [U.S. Army Corps of Engineers - Buffalo District, Buffalo, NY (United States); Johnson, R.; Peterson, J.; Picel, K. [Argonne National Laboratory, Argonne, IL (United States); DeVaughn, J. [Science Applications International Corporation, Twinsburg, OH (United States)

2008-07-01T23:59:59.000Z

460

Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 12  

SciTech Connect

The 664 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the twelfth in a series of reports prepared annually for the US Department of Energy Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy Remedial Action Programs. Major sections are (1) Decontamination and Decommissioning Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects, analyzes, and disseminates information on environmental restoration and remedial actions. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at FTS 624-7764 or (615) 574-7764.

Not Available

1991-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "risk-based preliminary remediation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 12. Environmental Restoration Program  

SciTech Connect

The 664 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the twelfth in a series of reports prepared annually for the US Department of Energy Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy Remedial Action Programs. Major sections are (1) Decontamination and Decommissioning Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects, analyzes, and disseminates information on environmental restoration and remedial actions. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at FTS 624-7764 or (615) 574-7764.

Not Available

1991-09-01T23:59:59.000Z

462

Nuclear facility decommissioning and site remedial actions: a selected bibliography. Volume 5  

SciTech Connect

This bibliography of 756 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the fifth in a series of annual reports prepared for the US Department of Energy, Division of Remedial Action Projects. Foreign as well as domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Uranium Mill Tailings Remedial Action Program; (5) Grand Junction Remedial Action Program; (6) Uranium Mill Tailings Management; and (7) Technical Measurements Center. Chapter sections for chapters 1, 2, 4, and 6 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for the categories of author, corporate affiliation, title, publication description, geographic location, and keywords. The Appendix contains a list of frequently used acronyms.

Owen, P.T.; Knox, N.P.; Chilton, B.D.; Baldauf, M.F.

1984-09-01T23:59:59.000Z

463

An economic decision framework using modeling for improving aquifer remediation design  

SciTech Connect

Reducing cost is a critical challenge facing environmental remediation today. One of the most effective ways of reducing costs is to improve decision-making. This can range from choosing more cost- effective remediation alternatives (for example, determining whether a groundwater contamination plume should be remediated or not) to improving data collection (for example, determining when data collection should stoop). Uncertainty in site conditions presents a major challenge for effective decision-making. We present a framework for increasing the effectiveness of remedial design decision-making at groundwater contamination sites where there is uncertainty in many parameters that affect remediation design. The objective is to provide an easy-to-use economic framework for making remediation decisions. The presented framework is used to 1) select the best remedial design from a suite of possible ones, 2) estimate if additional data collection is cost-effective, and 3) determine the most important parameters to be sampled. The framework is developed by combining elements from Latin-Hypercube simulation of contaminant transport, economic risk-cost-benefit analysis, and Regional Sensitivity Analysis (RSA).

James, B.R.; Gwo, J.P.; Toran, L.E.

1995-11-01T23:59:59.000Z

464

Enhanced remedial amendment delivery through fluid viscosity modifications: Experiments and numerical simulations  

Science Journals Connector (OSTI)

Low-permeability zones are typically bypassed when remedial fluids are injected into subsurface heterogeneous aquifer systems. Therefore, contaminants in the bypassed areas may not be contacted by the amendments in the remedial fluid, which may significantly prolong remediation operations. Laboratory experiments and numerical studies have been conducted to investigate the use of a shear-thinning polymer (Xanthan gum) to improve access to low-permeability zones in heterogeneous systems. The chemicals sodium mono-phosphate and the surfactant MA-80 were used as the remedial amendments. The impact of polymer concentration, fluid injection rate, and permeability contrast in the heterogeneous systems has been studied in a series of eleven two-dimensional flow cell experiments. The Subsurface Transport over Multiple Phases (STOMP) simulator was modified to include polymer-induced shear-thinning effects. The experimental and simulation results clearly show that using the polymer leads to an enhanced delivery of remedial amendments to lower-permeability zones and an increased sweeping efficiency. An added benefit of using the polymer is the stabilization of the displacing front when density differences exist between displaced and displacing fluids. The modified STOMP simulator was able to predict the experimental observed fluid displacing behavior well and might be used to predict subsurface remediation performance when a shear-thinning fluid is used to remediate a heterogeneous system at larger scales.

L. Zhong; M. Oostrom; T.W. Wietsma; M.A. Covert

2008-01-01T23:59:59.000Z

465

Overview of the U.S. Department of Energy Formerly Utilized Sites Remedial Action Program - 12189  

SciTech Connect

The U.S. Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) was established in 1974 to address residual radiological contamination at sites where work was performed for the Manhattan Engineer District and U.S. Atomic Energy Commission. Initially, FUSRAP activities began with a records search for sites that had the potential to contain residual radiological contamination; 46 sites were identified that were eligible for and required remediation. Remedial action began in 1979. In 1997, Congress assigned responsibility for the remediation of FUSRAP sites to the U.S. Army Corps of Engineers (USACE). DOE retains responsibility for determining if sites are eligible for FUSRAP remediation and for providing long-term surveillance and maintenance (LTS&M) of remediated FUSRAP sites. DOE LTS&M activities are designed to ensure that FUSRAP sites remain protective of human health and the environment and to preserve knowledge regarding FUSRAP sites. Additional elements include eligibility determinations, transition of remediated sites from USACE to DOE, LTS&M operations such as inspections and institutional controls management, stakeholder support, preservation of records, and real property and reuse. DOE maintains close coordination with USACE and regulators to ensure there is no loss of protectiveness when sites transition to DOE for LTS&M.

Clayton, Christopher [U.S. Department of Energy Office of Legacy Management, Washington, DC; Kothari, Vijendra [U.S. Department of Energy Office of Legacy Management, Morgantown, West Virginia; Starr, Ken [U.S. Department of Energy Office of Legacy Management, Westminster, Colorado; Gillespie, Joey [S.M. Stoller Corporation, Contractor for the U.S. Department of Energy Office of Legacy Management, Grand Junction, Colorado; Widdop, Michael [S.M. Stoller Corporation, Contractor for the U.S. Department of Energy Office of Legacy Management, Grand Junction, Colorado; none,

2012-02-26T23:59:59.000Z

466

BJC Preliminary Notice of Violation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Enclosure Enclosure Preliminary Notice of Violation Bechtel Jacobs Company, LLC East Tennessee Technology Park WEA-2010-01 As a result of a U.S. Department of Energy (DOE) investigation into the facts and circumstances surrounding the electrical arc event that occurred in building K-1210 at the East Tennessee Technology Park (ETTP) on March 19, 2009, multiple violations of DOE worker safety and health requirements by Bechtel Jacobs Company, LLC (BJC) were identified. The violations involved deficiencies in electrical hazard identification and assessment of existing conditions; electrical hazard verification and control; training and information; and implementation of the BJC electrical safety program. The violations have been determined to be three Severity Level I violations and one Severity

467

Final audit report of remedial action construction at the UMTRA Project Mexican Hat, Utah -- Monument Valley, Arizona, sites  

SciTech Connect

The final audit report for remedial action at the Mexican Hat, Utah, Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and QA remedial action close-out inspections performed by the US Department of Energy (DOE) and the Technical Assistance Contractor (TAC); on-site construction reviews (OSCR) performed by the US Nuclear Regulatory Commission (NRC); and a surveillance performed by the Navajo Nation. This report refers to remedial action activities performed at the Mexican Hat, Utah--Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites.

NONE

1995-10-01T23:59:59.000Z

468

A comparison of the RCRA Corrective Action and CERCLA Remedial Action Processes  

SciTech Connect

This document provides a comprehensive side-by-side comparison of the RCRA corrective action and the CERCLA remedial action processes. On the even-numbered pages a discussion of the RCRA corrective action process is presented and on the odd-numbered pages a comparative discussion of the CERCLA remedial action process can be found. Because the two programs have a difference structure, there is not always a direct correlation between the two throughout the document. This document serves as an informative reference for Departmental and contractor personnel responsible for oversight or implementation of RCRA corrective action and CERCLA remedia