  1. Risk Management Tool Attributes: | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Risk Management Tool Attributes: Risk Management Tool Attributes: PDF icon Risk Management Tool Attributes: More Documents & Publications Heating Ventilation and Air Conditioning ...

  2. Risk Assessment/Management Tool

    Energy Science and Technology Software Center (OSTI)

    2010-12-31

    RAMTool performs the following: • A tool to perform facility and programmatic risk assessments, produce risk registers, develop risk management plans (RMPs), link risks to improvement/risk-reduction projects, and actively manage risks • Ability to conduct risk assessments. Ease of determination of probability and consequence based on industry standard risk matrices. Complies with site risk management performance document. Provides multiple outputs/report for required risk forms. Conduct quick risk data analysis. • Performs/calculates a facility risk factormore » (RF) and a programmatic RF. Supports project and initiative prioritization and funding in order to make solid decisions on risk reduction. Assigns responsibility and accountability at a risk owner (RO) level. Monitors and tracks progress toward completing mitigation strategies. Ability to import massive amounts of data at the push of a button. Integrates development of a Risk Management Plan (RMP) Built for ease-of-use – design, built, and used by technical/management personnel. Can be customized (functions and/or reports) for further analysis« less

  3. Bio Risk Assessment Tool

    Energy Science and Technology Software Center (OSTI)

    2004-07-22

    The Biosecurity Risk Assessment Tool (BRAT) is a new type of computer application for the screening-level assessment of risk to dairy operations. BRAT for Dairies is designed to be intuitive and easy to use. Users enter basic data-property address, feed management, employee population, and so on - into the interface. Using these data and rules found in an expert system. BRAT for Dairies consults appropriate sections of its database. The expert system determines the riskmore » implications of the basic data, e.g. diseases are closely tied to pen location with respect to the outside world, When the analysis is complete, BRAT for Dairies evaluates and allocates the risk for each hazard, ranks the risks, and displays the results graphically.« less

  4. Oracle Management Tool Suite

    Energy Science and Technology Software Center (OSTI)

    2007-06-01

    The Oracle Management Tool Suite is used to automatically manage Oracle based systems. This includes startup and shutdown of databases and application servers as well as backup, space management, workload management and log file management.

  5. Risk Management Process Overview

    Broader source: Energy.gov [DOE]

    The cybersecurity risk management process explained in the Electricity Sector Cybersecurity Risk Management Process (RMP) Guideline has two primary components: the risk management model and the the risk management cycle.

  6. NGNP Risk Management Database: A Model for Managing Risk

    SciTech Connect (OSTI)

    John Collins

    2009-09-01

    To facilitate the implementation of the Risk Management Plan, the Next Generation Nuclear Plant (NGNP) Project has developed and employed an analytical software tool called the NGNP Risk Management System (RMS). A relational database developed in Microsoft Access, the RMS provides conventional database utility including data maintenance, archiving, configuration control, and query ability. Additionally, the tools design provides a number of unique capabilities specifically designed to facilitate the development and execution of activities outlined in the Risk Management Plan. Specifically, the RMS provides the capability to establish the risk baseline, document and analyze the risk reduction plan, track the current risk reduction status, organize risks by reference configuration system, subsystem, and component (SSC) and Area, and increase the level of NGNP decision making.

  7. Budget Risk & Prioritization Analysis Tool

    Energy Science and Technology Software Center (OSTI)

    2010-12-31

    BRPAtool performs the following: ?Assists managers in making solid decisions on what scope/activities to reduce and/or eliminate, to meet constrained budgets, based on multiple risk factors ?Enables analysis of different budget scenarios ?Can analyze risks and cost for each activity based on technical, quantifiable risk criteria and management-determined risks ?Real-time analysis ?Enables managers to determine the multipliers and where funding is best applied ?Promotes solid budget defense

  8. Risk Management Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-01-12

    The purpose of this guide is to describe effective risk management processes. The continuous and iterative process includes updating project risk documents and the risk management plan and emphasizes implementation communication of the risks and actions taken.

  9. Managing risk in software systems

    SciTech Connect (OSTI)

    Fletcher, S.K.; Jansma, R.M.; Murphy, M.D.

    1995-07-01

    A methodology for risk management in the design of software systems is presented. It spans security, safety, and correct operation of software within the context of its environment, and produces a risk analysis and documented risk management strategy. It is designed to be iteratively applied, to attain appropriate levels of detail throughout the analysis. The methodology and supporting tools are discussed. The methodology is critiqued relative to other research in the field. Some sample applications of the methodology are presented.

  10. Budget Risk & Prioritization Analysis Tool

    Energy Science and Technology Software Center (OSTI)

    2010-12-31

    BRPAtool performs the following: •Assists managers in making solid decisions on what scope/activities to reduce and/or eliminate, to meet constrained budgets, based on multiple risk factors •Enables analysis of different budget scenarios •Can analyze risks and cost for each activity based on technical, quantifiable risk criteria and management-determined risks •Real-time analysis •Enables managers to determine the multipliers and where funding is best applied •Promotes solid budget defense

  11. The Enterprise Risk Management Model

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Enterprise Risk Management Model Using the Risk Assessment Tool to Prepare a Justification Memorandum for the Development and Revision of Departmental Directives * On January 14, 2011, Secretary Chu issued a memorandum outlining goals for improving mission execution. * An Integrated Management System (IMS) Team consisting of both Federal managers, subject matters experts and contractors has been engaging leadership across the Department to develop a plan for creating and implementing an

  12. Risk Management RM

    Broader source: Energy.gov [DOE]

    This tool is the process of continuous and iterative identification and control of project risks and opportunities. Risks can be technical, financial, or programmatic. The goal for the risk...

  13. Enterprise Risk Management Framework

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Framework The Enterprise Risk Management (ERM) framework includes four steps: identify the risks, determine the probability and impact of each one, identify controls that are...

  14. Loan Specialist (Risk Management)

    Broader source: Energy.gov [DOE]

    This position is located in the U.S. Department of Energy (DOE), Loan Programs Office (LPO), Risk Management Division (RMD), and Enterprise Risk Management & Compliance Branch. The LPO mission...

  15. Analysis of Cluster Management Tools

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Analysis of Configuration Management Tools Computer System, Cluster, and Networking Summer Institute Team: Evan Leeseberg, James Kang, Katherine Nystrom Mentors: Kevin Tegtmeier,...

  16. Risk Assessment & Management Information

    Broader source: Energy.gov [DOE]

    NRC - A Proposed Risk Management Regulatory Framework, April 2012 Risk Assessment Technical Experts Working Group (RWG) web page DOE Standard on Development and Use of Probabilistic Risk Assessment in DOE Nuclear Safety Applications (draft), December 2010 Consortium for Risk Evaluation with Stakeholder Participation Workshop on Risk Assessment and Safety Decision Making Under Uncertainty

  17. Tank waste remediation system risk management list

    SciTech Connect (OSTI)

    Collard, L.B.

    1995-10-31

    The Tank Waste Remedation System (TWRS) Risk Management List and it`s subset of critical risks, the Critical Risk Management List, provide a tool to senior RL and WHC management (Level-1 and -2) to manage programmatic risks that may significantly impact the TWRS program. The programmatic risks include cost, schedule, and performance risks. Performance risk includes technical risk, supportability risk (such as maintainability and availability), and external risk (i.e., beyond program control, for example, changes in regulations). The risk information includes a description, its impacts, as evaluation of the likelihood, consequences and risk value, possible mitigating actions, and responsible RL and WHC managers. The issues that typically form the basis for the risks are presented in a separate table and the affected functions are provided on the management lists.

  18. ARM - Metadata Management Tool

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Engineering Home Workflow Graphic Engineering Workflow Document Tools for Workflow ECR ECO BCR Ingests Value-Added Products Reprocessing Instruments Data System Elements Field...

  19. Enterprise Risk Management Model

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Model The Enterprise Risk Management (ERM) Model is a system used to analyze the cost and benefit of addressing risks inherent in the work performed by the Department of Energy. This system measures risk using a combination of qualitative and quantitative methods to set a standard method for analyzing risk across the many functions within the department. Risks generally fall within five categories regardless ofthe subject matter ofthe subsystem. These categories are (1) risks to people, (2)

  20. Risk Management Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-01-18

    This Guide provides non-mandatory risk management approaches for implementing the requirements of DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets. Supersedes DOE G 413.3-7.

  1. Enterprise Risk Management Framework

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Framework The Enterprise Risk Management (ERM) framework includes four steps: identify the risks, determine the probability and impact of each one, identify controls that are already in place that mitigate that risk, and propose additional controls if needed. Step 1: Identify Risks - What can go wrong? This step should identify the negative outcomes that could result from an action or decision . It is important to consider a wide range of risks, and so the Department's ERM framework includes

  2. Issues Management Tool

    Energy Science and Technology Software Center (OSTI)

    2010-12-31

    IMTool performs the following: • The IMTool can manage issues, actions, and activities from one screen. • Provides enhanced and intuitive searching, sorting, and filtering capabilities. Grids allow for filtering any column instantly by any data heading. • IMTool uses drop-down menus to ensure date is entered accurately with consistency. • User-friendly system – highly utilized commitment tracking screen functions. Information is viewed on the left side of the screen and managed on the right.

  3. Innovative Computational Tools for Reducing Exploration Risk...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Risk Through Integration of Water-Rock Interactions and Magnetotelluric Surveys Innovative Computational Tools for Reducing Exploration Risk Through Integration of Water-Rock ...

  4. D&D and Risk Assessment Tools

    Broader source: Energy.gov [DOE]

    ORISE and PNNL both developed tools to assist in the risk assessment and planning of D&D activities. PNNL developed a Risk D&D tool, a rapid prototype computerbased model, to evaluate...

  5. Risk Management Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-09-16

    This Guide provides a framework for identifying and managing key technical, schedule, and cost risks through applying the requirements of DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, dated 7-28-06. Canceled by DOE G 413.3-7A, dated 1-12-11. Does not cancel other directives.

  6. Systems approach to project risk management

    SciTech Connect (OSTI)

    Kindinger, J. P.

    2002-01-01

    This paper describes the need for better performance in the planning and execution of projects and examines the capabilities of two different project risk analysis methods for improving project performance. A quantitative approach based on concepts and tools adopted from the disciplines of systems analysis, probabilistic risk analysis, and other fields is advocated for managing risk in large and complex research & development projects. This paper also provides an overview of how this system analysis approach for project risk management is being used at Los Alamos National Laboratory along with examples of quantitative risk analysis results and their application to improve project performance.

  7. Federal Energy Management Tools | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Tools Federal Energy Management Tools logo_femp.png The Federal Energy Management Program (FEMP) offers links to tools that can help agencies reduce energy use and meet federal laws and requirements. Tools include software, calculators, data sets, and databases created by the U.S. Department of Energy and other federal organizations. To find a tool, browse by title, description, type, or category. Click a column heading to sort the table. Title Description Type Category Building Life Cycle Cost

  8. Risk assessment meta tool LDRD final report.

    SciTech Connect (OSTI)

    Bouchard, Ann Marie; Osbourn, Gordon Cecil

    2006-12-01

    The goal of this project was to develop a risk analysis meta tool--a tool that enables security analysts both to combine and analyze data from multiple other risk assessment tools on demand. Our approach was based on the innovative self-assembling software technology under development by the project team. This technology provides a mechanism for the user to specify his intentions at a very high level (e.g., equations or English-like text), and then the code self-assembles itself, taking care of the implementation details. The first version of the meta tool focused specifically in importing and analyzing data from Joint Conflict and Tactical Simulation (JCATS) force-on-force simulation. We discuss the problem, our approach, technical risk, and accomplishments on this project, and outline next steps to be addressed with follow-on funding.

  9. Tank Waste Remediation System Characterization Project Programmatic Risk Management Plan

    SciTech Connect (OSTI)

    Baide, D.G.; Webster, T.L.

    1995-12-01

    The TWRS Characterization Project has developed a process and plan in order to identify, manage and control the risks associated with tank waste characterization activities. The result of implementing this process is a defined list of programmatic risks (i.e. a risk management list) that are used by the Project as management tool. This concept of risk management process is a commonly used systems engineering approach which is being applied to all TWRS program and project elements. The Characterization Project risk management plan and list are subset of the overall TWRS risk management plan and list.

  10. NGNP Risk Management Database: A Model for Managing Risk

    SciTech Connect (OSTI)

    John Collins; John M. Beck

    2011-11-01

    The Next Generation Nuclear Plant (NGNP) Risk Management System (RMS) is a database used to maintain the project risk register. The RMS also maps risk reduction activities to specific identified risks. Further functionality of the RMS includes mapping reactor suppliers Design Data Needs (DDNs) to risk reduction tasks and mapping Phenomena Identification Ranking Table (PIRTs) to associated risks. This document outlines the basic instructions on how to use the RMS. This document constitutes Revision 1 of the NGNP Risk Management Database: A Model for Managing Risk. It incorporates the latest enhancements to the RMS. The enhancements include six new custom views of risk data - Impact/Consequence, Tasks by Project Phase, Tasks by Status, Tasks by Project Phase/Status, Tasks by Impact/WBS, and Tasks by Phase/Impact/WBS.

  11. Lessons Learned in Risk Management on NCSX

    SciTech Connect (OSTI)

    Neilson, G. H.; Gruber, C. O.; Harris, J. H.; Rej, D. J.; Simmons, R. T.; Strykowsky, R. L.

    2009-07-21

    The National Compact Stellarator Experiment (NCSX) was designed to test physics principles of an innovative stellarator design developed by the Princeton Plasma Physics Laboratory and Oak Ridge National Laboratory. Construction of some of the major components and sub-assemblies was completed, but the estimated cost and schedule for completing the project grew as the technical requirements and risks became better understood, leading to its cancellation in 2008. The project's risks stemmed from its technical challenges, primarily the complex component geometries and tight tolerances that were required. The initial baseline, established in 2004, was supported by a risk management plan and risk-based contingencies, both of which proved to be inadequate. Technical successes were achieved in the construction of challenging components and subassemblies, but cost and schedule growth was experienced. As part of an effort to improve project performance, a new risk management program was devised and implemented in 2007-08. It led to a better understanding of project risks, a sounder basis for contingency estimates, and improved management tools. Although the risks ultimately were unacceptable to the sponsor, valuable lessons in risk management were learned through the experiences with the NCSX project.

  12. Lessons Learned in Risk Management on NCSX

    SciTech Connect (OSTI)

    Neilson, G. H.; Gruber, C. O.; Harris, Jeffrey H; Rej, D. J.; Simmons, R. T.; Strykowsky, R. L.

    2010-01-01

    The National Compact Stellarator Experiment (NCSX) was designed to test physics principles of an innovative stellarator design developed by Princeton Plasma Physics Laboratory and Oak Ridge National Laboratory. Construction of some of the major components and subassemblies was completed, but the estimated cost and schedule for completing the project grew as the technical requirements and risks became better understood, leading to its cancellation in 2008. The project's risks stemmed from its technical challenges, primarily the complex component geometries and tight tolerances that were required. The initial baseline, which was established in 2004, was supported by a risk management plan and risk-based contingencies, both of which proved to be inadequate. Technical successes were achieved in the construction of challenging components and subassemblies, but cost and schedule growth was experienced. As part of an effort to improve project performance, a new risk management program was devised and implemented in 2007-2008. It led to a better understanding of project risks, a sounder basis for contingency estimates, and improved management tools. Although the risks were ultimately unacceptable to the sponsor, valuable lessons in risk management were learned through the experiences with the NCSX project.

  13. Management System Verification (MSV) Tool

    Broader source: Energy.gov [DOE]

    The MSV process developed by ACC is a tool (not a requirement) that DOE sites may consider to help determine whether their ES&H program is truly integrated into all work at all levels by all employees.

  14. Federal Flood Risk Management Standard

    Broader source: Energy.gov [DOE]

    The Federal Flood Risk Management Standard builds upon Executive Order (E.O.) 11988 and is to be incorporated into existing Federal department and agency processes used to implement E.O. 11988.

  15. Envisory Financial Risk Management | Open Energy Information

    Open Energy Info (EERE)

    Envisory Financial Risk Management Jump to: navigation, search Name: Envisory Financial Risk Management Place: Mnchen, Bavaria, Germany Zip: 80331 Sector: Renewable Energy...

  16. Designs for Risk Evaluation and Management

    SciTech Connect (OSTI)

    2015-12-01

    The Designs for Risk Evaluation and Management (DREAM) tool was developed as part of the effort to quantify the risk of geologic storage of carbon dioxide (CO2) under the U.S. Department of Energy’s National Risk Assessment Partnership (NRAP). DREAM is an optimization tool created to identify optimal monitoring schemes that minimize the time to first detection of CO2 leakage from a subsurface storage formation. DREAM acts as a post-processer on user-provided output from subsurface leakage simulations. While DREAM was developed for CO2 leakage scenarios, it is applicable to any subsurface leakage simulation of the same output format. The DREAM tool is comprised of three main components: (1) a Java wizard used to configure and execute the simulations, (2) a visualization tool to view the domain space and optimization results, and (3) a plotting tool used to analyze the results. A secondary Java application is provided to aid users in converting common American Standard Code for Information Interchange (ASCII) output data to the standard DREAM hierarchical data format (HDF5). DREAM employs a simulated annealing approach that searches the solution space by iteratively mutating potential monitoring schemes built of various configurations of monitoring locations and leak detection parameters. This approach has proven to be orders of magnitude faster than an exhaustive search of the entire solution space. The user’s manual illustrates the program graphical user interface (GUI), describes the tool inputs, and includes an example application.

  17. Training and Required Reading Management Tool

    Energy Science and Technology Software Center (OSTI)

    2009-08-13

    This tool manages training and required reading for groups, facilities, etc – abilities beyond the site training systems. TRRMTool imports training data from controlled site data sources/systems and provides greater management and reporting. Clients have been able to greatly reduce the time and effort required to manage training, have greater accuracy, foster individual accountability, and be proactive in verifying training of support personnel, to maintain compliance.

  18. Hopper File Management Tool (Conference) | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    Conference: Hopper File Management Tool Citation Details In-Document Search Title: Hopper File Management Tool You are accessing a document from the Department of Energy's (DOE) ...

  19. Marine and Hydrokinetic Technology Development Risk Management Framework

    SciTech Connect (OSTI)

    Snowberg, David; Weber, Jochem

    2015-09-01

    Over the past decade, the global marine and hydrokinetic (MHK) industry has suffered a number of serious technological and commercial setbacks. To help reduce the risks of industry failures and advance the development of new technologies, the U.S. Department of Energy (DOE) and the National Renewable Energy Laboratory (NREL) developed an MHK Risk Management Framework. By addressing uncertainties, the MHK Risk Management Framework increases the likelihood of successful development of an MHK technology. It covers projects of any technical readiness level (TRL) or technical performance level (TPL) and all risk types (e.g. technological risk, regulatory risk, commercial risk) over the development cycle. This framework is intended for the development and deployment of a single MHK technology—not for multiple device deployments within a plant. This risk framework is intended to meet DOE’s risk management expectations for the MHK technology research and development efforts of the Water Power Program (see Appendix A). It also provides an overview of other relevant risk management tools and documentation.1 This framework emphasizes design and risk reviews as formal gates to ensure risks are managed throughout the technology development cycle. Section 1 presents the recommended technology development cycle, Sections 2 and 3 present tools to assess the TRL and TPL of the project, respectively. Section 4 presents a risk management process with design and risk reviews for actively managing risk within the project, and Section 5 presents a detailed description of a risk registry to collect the risk management information into one living document. Section 6 presents recommendations for collecting and using lessons learned throughout the development process.

  20. Overview of the Hanford risk management plan

    SciTech Connect (OSTI)

    Halverson, T.G.

    1998-03-26

    The Project Hanford Management Contract called for the enhancement of site-wide decision processes, and development of a Hanford Risk Management Plan to adopt or develop a risk management system for the Hanford Site. This Plan provides a consistent foundation for Site issues and addresses site-wide management of risks of all types. It supports the Department of Energy planning and sitewide decision making policy. Added to this requirement is a risk performance report to characterize the risk management accomplishments. This paper presents the development of risk management within the context of work planning and performance. Also discussed are four risk elements which add value to the context.

  1. Development of an Automated Security Risk Assessment Methodology Tool for Critical Infrastructures.

    SciTech Connect (OSTI)

    Jaeger, Calvin D.; Roehrig, Nathaniel S.; Torres, Teresa M.

    2008-12-01

    This document presents the security automated Risk Assessment Methodology (RAM) prototype tool developed by Sandia National Laboratories (SNL). This work leverages SNL's capabilities and skills in security risk analysis and the development of vulnerability assessment/risk assessment methodologies to develop an automated prototype security RAM tool for critical infrastructures (RAM-CITM). The prototype automated RAM tool provides a user-friendly, systematic, and comprehensive risk-based tool to assist CI sector and security professionals in assessing and managing security risk from malevolent threats. The current tool is structured on the basic RAM framework developed by SNL. It is envisioned that this prototype tool will be adapted to meet the requirements of different CI sectors and thereby provide additional capabilities.

  2. New risk metrics and mathematical tools for risk analysis: Current and future challenges

    SciTech Connect (OSTI)

    Skandamis, Panagiotis N. Andritsos, Nikolaos Psomas, Antonios Paramythiotis, Spyridon

    2015-01-22

    The current status of the food safety supply world wide, has led Food and Agriculture Organization (FAO) and World Health Organization (WHO) to establishing Risk Analysis as the single framework for building food safety control programs. A series of guidelines and reports that detail out the various steps in Risk Analysis, namely Risk Management, Risk Assessment and Risk Communication is available. The Risk Analysis approach enables integration between operational food management systems, such as Hazard Analysis Critical Control Points, public health and governmental decisions. To do that, a series of new Risk Metrics has been established as follows: i) the Appropriate Level of Protection (ALOP), which indicates the maximum numbers of illnesses in a population per annum, defined by quantitative risk assessments, and used to establish; ii) Food Safety Objective (FSO), which sets the maximum frequency and/or concentration of a hazard in a food at the time of consumption that provides or contributes to the ALOP. Given that ALOP is rather a metric of the public health tolerable burden (it addresses the total failure that may be handled at a national level), it is difficult to be interpreted into control measures applied at the manufacturing level. Thus, a series of specific objectives and criteria for performance of individual processes and products have been established, all of them assisting in the achievement of FSO and hence, ALOP. In order to achieve FSO, tools quantifying the effect of processes and intrinsic properties of foods on survival and growth of pathogens are essential. In this context, predictive microbiology and risk assessment have offered an important assistance to Food Safety Management. Predictive modelling is the basis of exposure assessment and the development of stochastic and kinetic models, which are also available in the form of Web-based applications, e.g., COMBASE and Microbial Responses Viewer), or introduced into user-friendly softwares, (e.g., Seafood Spoilage Predictor) have evolved the use of information systems in the food safety management. Such tools are updateable with new food-pathogen specific models containing cardinal parameters and multiple dependent variables, including plate counts, concentration of metabolic products, or even expression levels of certain genes. Then, these tools may further serve as decision-support tools which may assist in product logistics, based on their scientifically-based and momentary expressed spoilage and safety level.

  3. Designs for Risk Evaluation and Management

    Energy Science and Technology Software Center (OSTI)

    2015-12-01

    The Designs for Risk Evaluation and Management (DREAM) tool was developed as part of the effort to quantify the risk of geologic storage of carbon dioxide (CO2) under the U.S. Department of Energy’s National Risk Assessment Partnership (NRAP). DREAM is an optimization tool created to identify optimal monitoring schemes that minimize the time to first detection of CO2 leakage from a subsurface storage formation. DREAM acts as a post-processer on user-provided output from subsurface leakagemore » simulations. While DREAM was developed for CO2 leakage scenarios, it is applicable to any subsurface leakage simulation of the same output format. The DREAM tool is comprised of three main components: (1) a Java wizard used to configure and execute the simulations, (2) a visualization tool to view the domain space and optimization results, and (3) a plotting tool used to analyze the results. A secondary Java application is provided to aid users in converting common American Standard Code for Information Interchange (ASCII) output data to the standard DREAM hierarchical data format (HDF5). DREAM employs a simulated annealing approach that searches the solution space by iteratively mutating potential monitoring schemes built of various configurations of monitoring locations and leak detection parameters. This approach has proven to be orders of magnitude faster than an exhaustive search of the entire solution space. The user’s manual illustrates the program graphical user interface (GUI), describes the tool inputs, and includes an example application.« less

  4. First Capitol Risk Management LLC | Open Energy Information

    Open Energy Info (EERE)

    Capitol Risk Management LLC Jump to: navigation, search Name: First Capitol Risk Management, LLC Place: Galena, Illinois Zip: 61036 Product: First Capitol Risk Management...

  5. Risk Management Guide - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7A, Risk Management Guide by John Makepeace Functional areas: Risk Management, Safety and Security This Guide provides non-mandatory risk management approaches for implementing the...

  6. Quantitative Risk reduction estimation Tool For Control Systems, Suggested Approach and Research Needs

    SciTech Connect (OSTI)

    Miles McQueen; Wayne Boyer; Mark Flynn; Sam Alessi

    2006-03-01

    For the past year we have applied a variety of risk assessment technologies to evaluate the risk to critical infrastructure from cyber attacks on control systems. More recently, we identified the need for a stand alone control system risk reduction estimation tool to provide owners and operators of control systems with a more useable, reliable, and credible method for managing the risks from cyber attack. Risk is defined as the probability of a successful attack times the value of the resulting loss, typically measured in lives and dollars. Qualitative and ad hoc techniques for measuring risk do not provide sufficient support for cost benefit analyses associated with cyber security mitigation actions. To address the need for better quantitative risk reduction models we surveyed previous quantitative risk assessment research; evaluated currently available tools; developed new quantitative techniques [17] [18]; implemented a prototype analysis tool to demonstrate how such a tool might be used; used the prototype to test a variety of underlying risk calculational engines (e.g. attack tree, attack graph); and identified technical and research needs. We concluded that significant gaps still exist and difficult research problems remain for quantitatively assessing the risk to control system components and networks, but that a useable quantitative risk reduction estimation tool is not beyond reach.

  7. Federal Flood Risk Management Standard (2015)

    Broader source: Energy.gov [DOE]

    The Federal Flood Risk Management Standard (FFRMS (2015)) expands upon E.O. 11988, Floodplain Management, (1977) by directing that federal agencies use a higher vertical flood elevation and...

  8. Risk Reduction with a Fuzzy Expert Exploration Tool

    SciTech Connect (OSTI)

    Weiss, William W.; Broadhead, Ron; Mundorf, William R.

    2003-03-06

    A state-of-the-art exploration ''expert'' tool, relying on a computerized database and computer maps generated by neural networks, was developed through the use of ''fuzzy'' logic, a relatively new mathematical treatment of imprecise or non-explicit parameters and values. Oil prospecting risk can be reduced with the use of a properly developed and validated ''Fuzzy Expert Exploration (FEE) Tool.'' This FEE Tool can be beneficial in many regions of the U.S. by enabling risk reduction in oil and gas prospecting as well as decreased prospecting and development costs.

  9. Risk Management II Summit Agenda | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Risk Management II Summit Agenda Risk Management II Summit Agenda PDF icon Risk Management Summit Agenda.pdf More Documents & Publications ICAM Workshop Radio and Spectrum Management Ad Hoc Meetings

  10. Hopper File Management Tool (Conference) | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    Conference: Hopper File Management Tool Citation Details In-Document Search Title: Hopper File Management Tool Hopper is a powerful interactive tool that allows users to transfer and manipulate files and directories by means of a graphical user interface. Users can connect to and manage resources using the major file transfer protocols. Implemented in Java, Hopper can be run almost anywhere: from an individual's desktop machine to large production machines. In a high-performance computing

  11. Federal Energy Managment Program Investment Grade Audit Tool | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Managment Program Investment Grade Audit Tool Federal Energy Managment Program Investment Grade Audit Tool Zip file contains the Federal Energy Management Program's Investment Grade Audit (IGA) Tool that is used by energy service companies during the ESPC ENABLE process. Package icon enable_igatool.zip More Documents & Publications Energy Savings Performance Contract (ESPC) ENABLE Program ESPC ENABLE NOTICE OF INTENT TO AWARD GUIDE AND TEMPLATE Energy Savings Performance

  12. Bottling Electricity: Storage as a Strategic Tool for Managing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bottling Electricity: Storage as a Strategic Tool for Managing Variability and Capacity Concerns in the Modern Grid - EAC Report (December 2008) Bottling Electricity: Storage as a ...

  13. Risk Management Techniques and Practice Workshop Workshop Report

    SciTech Connect (OSTI)

    Quinn, T; Zosel, M

    2008-12-02

    At the request of the Department of Energy (DOE) Office of Science (SC), Lawrence Livermore National Laboratory (LLNL) hosted a two-day Risk Management Techniques and Practice (RMTAP) workshop held September 18-19 at the Hotel Nikko in San Francisco. The purpose of the workshop, which was sponsored by the SC/Advanced Scientific Computing Research (ASCR) program and the National Nuclear Security Administration (NNSA)/Advanced Simulation and Computing (ASC) program, was to assess current and emerging techniques, practices, and lessons learned for effectively identifying, understanding, managing, and mitigating the risks associated with acquiring leading-edge computing systems at high-performance computing centers (HPCCs). Representatives from fifteen high-performance computing (HPC) organizations, four HPC vendor partners, and three government agencies attended the workshop. The overall workshop findings were: (1) Standard risk management techniques and tools are in the aggregate applicable to projects at HPCCs and are commonly employed by the HPC community; (2) HPC projects have characteristics that necessitate a tailoring of the standard risk management practices; (3) All HPCC acquisition projects can benefit by employing risk management, but the specific choice of risk management processes and tools is less important to the success of the project; (4) The special relationship between the HPCCs and HPC vendors must be reflected in the risk management strategy; (5) Best practices findings include developing a prioritized risk register with special attention to the top risks, establishing a practice of regular meetings and status updates with the platform partner, supporting regular and open reviews that engage the interests and expertise of a wide range of staff and stakeholders, and documenting and sharing the acquisition/build/deployment experience; and (6) Top risk categories include system scaling issues, request for proposal/contract and acceptance testing, and vendor technical or business problems. HPC, by its very nature, is an exercise in multi-level risk management. Every aspect of stewarding HPCCs into the petascale era, from identification of the program drivers to the details of procurement actions and simulation environment component deployments, represents unprecedented challenges and requires effective risk management. The fundamental purpose of this workshop was to go beyond risk management processes as such and learn how to weave effective risk management practices, techniques, and methods into all aspects of migrating HPCCs into the next generation of leadership computing systems. This workshop was a follow-on to the Petascale System Integration Workshop hosted by Lawrence Berkeley National Laboratory (LBNL)/NERSC last year. It was intended to leverage and extend the risk management experience of the participants by looking for common best practices and unique processes that have been especially successful. This workshop assessed the effectiveness of tools and techniques that are or could be helpful in HPCC risk management, with a special emphasis on how practice meets process. As the saying goes: 'In theory, there is no difference between theory and practice. In practice there is'. Finally, the workshop brought together a network of experts who shared information as technology moves into the petascale era and beyond.

  14. New Technical Risk Management Development for Carbon Capture Process

    SciTech Connect (OSTI)

    Engel, David W.; Letellier, Bruce; Edwards, Brian; Leclaire, Rene; Jones, Edward

    2012-04-30

    The basic CCSI objective of accelerating technology development and commercial deployment of carbon capture technologies through the extensive use of numerical simulation introduces a degree of unfamiliarity and novelty that potentially increases both of the traditional risk elements. In order to secure investor confidence and successfully accelerate the marketability of carbon capture technologies, it is critical that risk management decision tools be developed in parallel with numerical simulation capabilities and uncertainty quantification efforts. The focus of this paper is on the development of a technical risk model that incorporates the specific technology maturity development (level).

  15. Radiation risk management at DOE accelerator facilities

    SciTech Connect (OSTI)

    Dyck, O.B. van

    1997-01-01

    The DOE accelerator contractors have been discussing among themselves and with the Department how to improve radiation safety risk management. This activity-how to assure prevention of unplanned high exposures-is separate from normal exposure management, which historically has been quite successful. The ad-hoc Committee on the Accelerator Safety Order and Guidance [CASOG], formed by the Accelerator Section of the HPS, has proposed a risk- based approach, which will be discussed. Concepts involved are risk quantification and comparison (including with non-radiation risk), passive and active (reacting) protection systems, and probabilistic analysis. Different models of risk management will be presented, and the changing regulatory environment will also be discussed..

  16. ELECTRICITY SUBSECTOR CYBERSECURITY RISK MANAGEMENT PROCESS

    Energy Savers [EERE]

    CYBERSECURITY RISK MANAGEMENT PROCESS U.S. Department of Energy May 2012 DOE/OE-0003 Acknowledgments This electricity subsector cybersecurity Risk Management Process (RMP) guideline was developed by the Department of Energy (DOE), in collaboration with the National Institute of Standards and Technology (NIST) and the North American Electric Reliability Corporation (NERC). Members of industry and utility-specific trade groups were included in authoring this guidance designed to be meaningful and

  17. Survey of tools for risk assessment of cascading outages

    SciTech Connect (OSTI)

    Papic, Milorad; Bell, Keith; Chen, Yousu; Dobson, Ian; Fonte, Louis; Haq, Enamul; Hines, Paul; Kirschen, Daniel; Luo, Xiaochuan; Miller, Stephen; Samaan, Nader A.; Vaiman, Marianna; Varghese, Matthew; Zhang, Pei

    2011-10-01

    Abstract-This paper is a result of ongoing activity carried out by Understanding, Prediction, Mitigation and Restoration of Cascading Failures Task Force under IEEE Computer Analytical Methods Subcommittee (CAMS). The task force's previous papers [1, 2] are focused on general aspects of cascading outages such as understanding, prediction, prevention and restoration from cascading failures. This is the second of two new papers, which extend this previous work to summarize the state of the art in cascading failure risk analysis methodologies and modeling tools. The first paper reviews the state of the art in methodologies for performing risk assessment of potential cascading outages [3]. This paper describes the state of the art in cascading failure modeling tools, documenting the view of experts representing utilities, universities and consulting companies. The paper is intended to constitute a valid source of information and references about presently available tools that deal with prediction of cascading failure events. This effort involves reviewing published literature and other documentation from vendors, universities and research institutions. The assessment of cascading outages risk evaluation is in continuous evolution. Investigations to gain even better understanding and identification of cascading events are the subject of several research programs underway aimed at solving the complexity of these events that electrical utilities face today. Assessing the risk of cascading failure events in planning and operation for power transmission systems require adequate mathematical tools/software.

  18. RISK REDUCTION WITH A FUZZY EXPERT EXPLORATION TOOL

    SciTech Connect (OSTI)

    Robert S. Balch; Ron Broadhead

    2005-03-01

    Incomplete or sparse data such as geologic or formation characteristics introduce a high level of risk for oil exploration and development projects. ''Expert'' systems developed and used in several disciplines and industries have demonstrated beneficial results when working with sparse data. State-of-the-art expert exploration tools, relying on a database, and computer maps generated by neural networks and user inputs, have been developed through the use of ''fuzzy'' logic, a mathematical treatment of imprecise or non-explicit parameters and values. Oil prospecting risk has been reduced with the use of these properly verified and validated ''Fuzzy Expert Exploration (FEE) Tools.'' Through the course of this project, FEE Tools and supporting software were developed for two producing formations in southeast New Mexico. Tools of this type can be beneficial in many regions of the U.S. by enabling risk reduction in oil and gas prospecting as well as decreased prospecting and development costs. In today's oil industry environment, many smaller exploration companies lack the resources of a pool of expert exploration personnel. Downsizing, volatile oil prices, and scarcity of domestic exploration funds have also affected larger companies, and will, with time, affect the end users of oil industry products in the U.S. as reserves are depleted. The FEE Tools benefit a diverse group in the U.S., allowing a more efficient use of scarce funds, and potentially reducing dependence on foreign oil and providing lower product prices for consumers.

  19. Information needs for risk management/communication

    SciTech Connect (OSTI)

    Bennett, D.A.

    1990-12-31

    The hazardous waste cleanup program under the Comprehensive Environmental Response, Compensation, and Liability Act (Superfund) is delegated to the ten Regions of the US Environmental Protection Agency (EPA) and has, to date, identified more than 33,000 sites for consideration. The size and complexity of the program places great demands on those who would provide information to achieve national consistency in application of risk assessment while meeting site-specific needs for risk management and risk communication.

  20. New Draft of Cybersecurity Risk Management Process (RMP) Guideline...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft of Cybersecurity Risk Management Process (RMP) Guideline Now Available for Public Comment (March 2012) New Draft of Cybersecurity Risk Management Process (RMP) Guideline Now ...

  1. UNEP-GEF Renewable Energy Project Financial Risk Management in...

    Open Energy Info (EERE)

    GEF Renewable Energy Project Financial Risk Management in Developing Countries Jump to: navigation, search Name UNEP-GEF Renewable Energy Project Financial Risk Management in...

  2. Enterprise Risk Management (ERM) Model - DOE Directives, Delegations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Enterprise Risk Management (ERM) Model by Website Administrator The Enterprise Risk Management Model is a new standardized framework that the Department will be using to develop,...

  3. Cryptographic Key Management and Critical Risk Assessment

    SciTech Connect (OSTI)

    Abercrombie, Robert K

    2014-05-01

    The Department of Energy Office of Electricity Delivery and Energy Reliability (DOE-OE) CyberSecurity for Energy Delivery Systems (CSEDS) industry led program (DE-FOA-0000359) entitled "Innovation for Increasing CyberSecurity for Energy Delivery Systems (12CSEDS)," awarded a contract to Sypris Electronics LLC to develop a Cryptographic Key Management System for the smart grid (Scalable Key Management Solutions for Critical Infrastructure Protection). Oak Ridge National Laboratory (ORNL) and Sypris Electronics, LLC as a result of that award entered into a CRADA (NFE-11-03562) between ORNL and Sypris Electronics, LLC. ORNL provided its Cyber Security Econometrics System (CSES) as a tool to be modified and used as a metric to address risks and vulnerabilities in the management of cryptographic keys within the Advanced Metering Infrastructure (AMI) domain of the electric sector. ORNL concentrated our analysis on the AMI domain of which the National Electric Sector Cyber security Organization Resource (NESCOR) Working Group 1 (WG1) has documented 29 failure scenarios. The computational infrastructure of this metric involves system stakeholders, security requirements, system components and security threats. To compute this metric, we estimated the stakes that each stakeholder associates with each security requirement, as well as stochastic matrices that represent the probability of a threat to cause a component failure and the probability of a component failure to cause a security requirement violation. We applied this model to estimate the security of the AMI, by leveraging the recently established National Institute of Standards and Technology Interagency Report (NISTIR) 7628 guidelines for smart grid security and the International Electrotechnical Commission (IEC) 63351, Part 9 to identify the life cycle for cryptographic key management, resulting in a vector that assigned to each stakeholder an estimate of their average loss in terms of dollars per day of system operation. To further address probabilities of threats, information security analysis can be performed using game theory implemented in dynamic Agent Based Game Theoretic (ABGT) simulations. Such simulations can be verified with the results from game theory analysis and further used to explore larger scale, real world scenarios involving multiple attackers, defenders, and information assets. The strategy for the game was developed by analyzing five electric sector representative failure scenarios contained in the AMI functional domain from NESCOR WG1. From these five selected scenarios, we characterized them into three specific threat categories affecting confidentiality, integrity and availability (CIA). The analysis using our ABGT simulation demonstrated how to model the AMI functional domain using a set of rationalized game theoretic rules decomposed from the failure scenarios in terms of how those scenarios might impact the AMI network with respect to CIA.

  4. D&D and Risk Assessment Tools

    Office of Environmental Management (EM)

    Page 1 of 2 Oak Ridge Institute for Science and Education Pacific Northwest National Laboratory Tennessee Washington D&D and Risk Assessment Tools Challenge The Department of Energy has numerous facilities which require deactivation and decommissioning (D&D). While carrying out the D&D of these facilities various health, safety and environmental requirements must be met. The challenge addressed in this study is to develop tools to assist the D&D workforce to be in compliance

  5. Survey of Tools for Risk Assessment of Cascading Outages

    SciTech Connect (OSTI)

    Papic, Milorad; Bell, Keith; Chen, Yousu; Dobson, Ian; Fonte, Louis; Haq, Enamul; Hines, Paul; Kirschen, Daniel; Luo, Xiaochuan; Miller, Stephen; Samaan, Nader A.; Vaiman, Marianna; Varghese, Matthew; Zhang, Pei

    2011-10-17

    Cascading failure can cause large blackouts, and a variety of methods are emerging to study this challenging topic. In parts 1 and 2 of this paper, the IEEE task force on cascading failure seeks to consolidate and review the progress of the field towards methods and tools of assessing the risk of cascading failure. Part 2 summarizes and discusses the state of the art in the available cascading failure modeling tools. The discussion integrates industry and research perspectives from a variety of institutions. Strengths, weaknesses, and gaps in current approaches are indicated.

  6. File and Directory Management Tool: view, organize, transfer...

    Office of Scientific and Technical Information (OSTI)

    Title: File and Directory Management Tool: view, organize, transfer files Not Specified Authors: Smith, N. G. ; O'Neill, N. J. ; Spencer, P. N. ; Long, J. W. Publication Date: ...

  7. Bottling Electricity: Storage as a Strategic Tool for Managing Variability

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Capacity Concerns in the Modern Grid - EAC Report (December 2008) | Department of Energy Bottling Electricity: Storage as a Strategic Tool for Managing Variability and Capacity Concerns in the Modern Grid - EAC Report (December 2008) Bottling Electricity: Storage as a Strategic Tool for Managing Variability and Capacity Concerns in the Modern Grid - EAC Report (December 2008) The objectives of this report are to provide the Secretary of Energy with the Electricity Advisory Committee's

  8. EERE Success Story-New Geothermal Exploration and Management Tools |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Geothermal Exploration and Management Tools EERE Success Story-New Geothermal Exploration and Management Tools April 18, 2013 - 12:00am Addthis To better isolate potential geothermal resources that lack surface manifestations, EERE partnered with the Colorado School of Mines to advance resource discovery. The university developed a method to comprehensively target geothermal drilling by combining geophysical data sets to generate more complete images of the subsurface

  9. Future Air traffic management Concepts Evaluation Tool (FACET) - Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Innovation Portal Analysis Energy Analysis Find More Like This Return to Search Future Air traffic management Concepts Evaluation Tool (FACET) National Aeronautics and Space Administration Ames Laboratory Contact NASA About This Technology Technology Marketing Summary The NASA Ames Research Center offers the opportunity to license and co-develop FACET, a flexible software tool for air traffic management. With thousands of planes flying overhead in the U.S. at any given time, there is an

  10. A New Tool for Effective and Efficient Project Management

    SciTech Connect (OSTI)

    Willett, Jesse A.

    2011-12-01

    Organizations routinely handle thousands of projects per year, and it is difficult to manage all these projects concurrently. Too often, projects do not get the attention they need when they need it. Management inattention can lead to late projects or projects with less than desirable content and/or deliverables. This paper discusses the application of Visual Project Management (VPM) as a method to track and manage projects. The VPM approach proved to be a powerful management tool without the overhead and restrictions of traditional management methods.

  11. Role of LEPCs in risk management and risk communication

    SciTech Connect (OSTI)

    Mannan, M.

    1995-12-31

    Under Section 112(r) of Title III of the Clean Air Act Amendments, the US Environmental Protection Agency (EPA) is required to develop regulations that would require development and implementation of risk management programs at facilities that manufacture, process, use, store, or otherwise handle regulated substances in quantities that exceed specified threshold quantities. On January 31, 1994, EPA published the final rule establishing the List of Regulated Substances and Thresholds for Accidental Release Prevention. The proposed rule will require covered facilities to develop and implement a risk management program. The proposed rule will also require facilities to communicate various information to the local emergency planning committee (LEPC). This information may be provided in the form of consultation and communication during the development of various elements of the risk management program and/or by providing access to the risk management plan (RMP). These requirements not only place an additional regulatory burden on facilities but also create the need for the LEPCs to start planning for strategies to deal with significant amount of technical information in a meaningful and effective manner. This paper presents a summary of EPA`s proposed rule, the role of LEPCs in the implementation of many aspects of the rule, and a description of the potential contents of an RMP. Covered facilities as well as the LEPCs may gain a significant advantage by engaging in early dialogue and proactive education to determine mutual needs.

  12. RISK REDUCTION WITH A FUZZY EXPERT EXPLORATION TOOL

    SciTech Connect (OSTI)

    Robert Balch

    2004-04-08

    Incomplete or sparse information on types of data such as geologic or formation characteristics introduces a high level of risk for oil exploration and development projects. ''Expert'' systems developed and used in several disciplines and industries have demonstrated beneficial results. A state-of-the-art exploration ''expert'' tool, relying on a computerized database and computer maps generated by neural networks, is being developed through the use of ''fuzzy'' logic, a relatively new mathematical treatment of imprecise or non-explicit parameters and values. Oil prospecting risk can be reduced with the use of a properly developed and validated ''Fuzzy Expert Exploration (FEE) Tool.'' This FEE Tool can be beneficial in many regions of the U.S. by enabling risk reduction in oil and gas prospecting as well as decreased prospecting and development costs. In the 1998-1999 oil industry environment, many smaller exploration companies lacked the resources of a pool of expert exploration personnel. Downsizing, low oil prices, and scarcity of exploration funds have also affected larger companies, and will, with time, affect the end users of oil industry products in the U.S. as reserves are depleted. The FEE Tool will benefit a diverse group in the U.S., leading to a more efficient use of scarce funds, and possibly decreasing dependence on foreign oil and lower product prices for consumers. This fifth annual (and tenth of 12 semi-annual reports) contains a summary of progress to date, problems encountered, plans for the next year, and an assessment of the prospects for future progress. The emphasis during the March 2003 through March 2004 period was directed toward completion of the Brushy Canyon FEE Tool and to Silurian-Devonian geology, and development of rules for the Devonian fuzzy system, and on-line software.

  13. NGNP Risk Management through Assessing Technology Readiness

    SciTech Connect (OSTI)

    John W. Collins

    2010-08-01

    Throughout the Next Generation Nuclear Plant (NGNP) project life cycle, technical risks are identified, analyzed, and mitigated and decisions are made regarding the design and selection of plant and sub-system configurations, components and their fabrication materials, and operating conditions. Risk resolution and decision making are key elements that help achieve project completion within budget and schedule constraints and desired plant availability. To achieve this objective, a formal decision-making and risk management process was developed for NGNP, based on proven systems engineering principles that have guided aerospace and military applications.

  14. RISK REDUCTION WITH A FUZZY EXPERT EXPLORATION TOOL

    SciTech Connect (OSTI)

    Robert Balch

    2003-04-15

    Incomplete or sparse information on types of data such as geologic or formation characteristics introduces a high level of risk for oil exploration and development projects. ''Expert'' systems developed and used in several disciplines and industries have demonstrated beneficial results. A state-of-the-art exploration ''expert'' tool, relying on a computerized database and computer maps generated by neural networks, is being developed through the use of ''fuzzy'' logic, a relatively new mathematical treatment of imprecise or non-explicit parameters and values. Oil prospecting risk can be reduced with the use of a properly developed and validated ''Fuzzy Expert Exploration (FEE) Tool.'' This FEE Tool can be beneficial in many regions of the U.S. by enabling risk reduction in oil and gas prospecting as well as decreased prospecting and development costs. In the 1998-1999 oil industry environment, many smaller exploration companies lacked the resources of a pool of expert exploration personnel. Downsizing, low oil prices, and scarcity of exploration funds have also affected larger companies, and will, with time, affect the end users of oil industry products in the U.S. as reserves are depleted. The pool of experts is much reduced today. The FEE Tool will benefit a diverse group in the U.S., leading to a more efficient use of scarce funds, and possibly decreasing dependence on foreign oil and lower product prices for consumers. This fourth of five annual reports contains a summary of progress to date, problems encountered, plans for the next year, and an assessment of the prospects for future progress. The emphasis during the April 2002 through March 2003 period was directed toward Silurian-Devonian geology, development of rules for the fuzzy system, and on-line software.

  15. RISK REDUCTION WITH A FUZZY EXPERT EXPLORATION TOOL

    SciTech Connect (OSTI)

    Robert Balch

    2003-10-15

    Incomplete or sparse information on types of data such as geologic or formation characteristics introduces a high level of risk for oil exploration and development projects. ''Expert'' systems developed and used in several disciplines and industries have demonstrated beneficial results. A state-of-the-art exploration ''expert'' tool, relying on a computerized database and computer maps generated by neural networks, is being developed through the use of ''fuzzy'' logic, a relatively new mathematical treatment of imprecise or non-explicit parameters and values. Oil prospecting risk can be reduced with the use of a properly developed and validated ''Fuzzy Expert Exploration (FEE) Tool.'' This FEE Tool can be beneficial in many regions of the U.S. by enabling risk reduction in oil and gas prospecting as well as decreased prospecting and development costs. In the 1998-1999 oil industry environment, many smaller exploration companies lacked the resources of a pool of expert exploration personnel. Downsizing, low oil prices, and scarcity of exploration funds have also affected larger companies, and will, with time, affect the end users of oil industry products in the U.S. as reserves are depleted. The FEE Tool will benefit a diverse group in the U.S., leading to a more efficient use of scarce funds, and possibly decreasing dependence on foreign oil and lower product prices for consumers. This ninth of ten semi-annual reports contains a summary of progress to date, problems encountered, plans for the next year, and an assessment of the prospects for future progress. The emphasis during the March 2003 through September 2003 period was directed toward Silurian-Devonian geology, development of rules for the fuzzy system, and on-line software.

  16. RISK REDUCTION WITH A FUZZY EXPERT EXPLORATION TOOL

    SciTech Connect (OSTI)

    William W. Weiss

    2001-09-30

    Incomplete or sparse information on types of data such as geologic or formation characteristics introduces a high level of risk for oil exploration and development projects. ''Expert'' systems developed and used in several disciplines and industries have demonstrated beneficial results. A state-of-the-art exploration ''expert'' tool, relying on a computerized database and computer maps generated by neural networks, is being developed through the use of ''fuzzy'' logic, a relatively new mathematical treatment of imprecise or non-explicit parameters and values. Oil prospecting risk can be reduced with the use of a properly developed and validated ''Fuzzy Expert Exploration (FEE) Tool.'' This FEE Tool can be beneficial in many regions of the U.S. by enabling risk reduction in oil and gas prospecting as well as decreased prospecting and development costs. In the 1998-1999 oil industry environment, many smaller exploration companies lacked the resources of a pool of expert exploration personnel. Downsizing, low oil prices, and scarcity of exploration funds have also affected larger companies, and will, with time, affect the end users of oil industry products in the U.S. as reserves are depleted. As a result, today's pool of experts is much reduced. The FEE Tool will benefit a diverse group in the U.S., leading to a more efficient use of scarce funds and lower product prices for consumers. This fifth of ten semi-annual reports contains a summary of progress to date, problems encountered, plans for the next year, and an assessment of the prospects for future progress. The emphasis during the May 2001 through September 2001 was directed toward development of rules for the fuzzy system.

  17. Risk D&D Rapid Prototype: Scenario Documentation and Analysis Tool

    SciTech Connect (OSTI)

    Unwin, Stephen D.; Seiple, Timothy E.

    2009-05-28

    Report describes process and methodology associated with a rapid prototype tool for integrating project risk analysis and health & safety risk analysis for decontamination and decommissioning projects.

  18. The Integrated Waste Tracking System - A Flexible Waste Management Tool

    SciTech Connect (OSTI)

    Anderson, Robert Stephen

    2001-02-01

    The US Department of Energy (DOE) Idaho National Engineering and Environmental Laboratory (INEEL) has fully embraced a flexible, computer-based tool to help increase waste management efficiency and integrate multiple operational functions from waste generation through waste disposition while reducing cost. The Integrated Waste Tracking System (IWTS)provides comprehensive information management for containerized waste during generation,storage, treatment, transport, and disposal. The IWTS provides all information necessary for facilities to properly manage and demonstrate regulatory compliance. As a platformindependent, client-server and Web-based inventory and compliance system, the IWTS has proven to be a successful tracking, characterization, compliance, and reporting tool that meets the needs of both operations and management while providing a high level of management flexibility.

  19. Proposed framework for the Western Area Power Administration Environmental Risk Management Program

    SciTech Connect (OSTI)

    Glantz, C.S.; DiMassa, F.V.; Pelto, P.J.; Brothers, A.J.; Roybal, A.L.

    1994-12-01

    The Western Area Power Administration (Western) views environmental protection and compliance as a top priority as it manages the construction, operation, and maintenance of its vast network of transmission lines, substations, and other facilities. A recent Department of Energy audit of Western`s environmental management activities recommends that Western adopt a formal environmental risk program. To accomplish this goal, Western, in conjunction with Pacific Northwest Laboratory, is in the process of developing a centrally coordinated environmental risk program. This report presents the results of this design effort, and indicates the direction in which Western`s environmental risk program is heading. Western`s environmental risk program will consist of three main components: risk communication, risk assessment, and risk management/decision making. Risk communication is defined as an exchange of information on the potential for threats to human health, public safety, or the environment. This information exchange provides a mechanism for public involvement, and also for the participation in the risk assessment and management process by diverse groups or offices within Western. The objective of risk assessment is to evaluate and rank the relative magnitude of risks associated with specific environmental issues that are facing Western. The evaluation and ranking is based on the best available scientific information and judgment and serves as input to the risk management process. Risk management takes risk information and combines it with relevant non-risk factors (e.g., legal mandates, public opinion, costs) to generate risk management options. A risk management tool, such as decision analysis, can be used to help make risk management choices.

  20. NREL: Transportation Research - Vehicle Thermal Management Models and Tools

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Models and Tools image of three models of semi truck cabs. Truck cab models drawn from CAD geometry using CoolCalc (left and center), and a model with overlay of computational fluid dynamics flow (right) indicate areas of heat absorption and loss. Illustrations by Jason Lustbader, Matt Jeffers, and Larry Chaney, NREL The National Renewable Energy Laboratory's (NREL's) vehicle thermal management modeling tools allow researchers to assess the trade-offs and calculate the potential benefits of

  1. Radiation and Chemical Risk Management | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Radiation & Chemical Risk Mgmt. Argonne assists technical problems as diverse as ... Argonne's work in radiation and chemical risk management includes the development of ...

  2. File and Directory Management Tool: view, organize, transfer files () |

    Office of Scientific and Technical Information (OSTI)

    SciTech Connect File and Directory Management Tool: view, organize, transfer files Citation Details Software Request Title: File and Directory Management Tool: view, organize, transfer files Not Specified Authors: Smith, N. G. ; O'Neill, N. J. ; Spencer, P. N. ; Long, J. W. Publication Date: 2008-03-14 OSTI Identifier: 1231070 Report Number(s): Hopper V2.0; 002218MLTPL00 LLNL-CODE-403380 DOE Contract Number: AC52-07NA27344 Software Revision: 00 Software Package Number: 002218 Software

  3. Understanding and managing risk in software systems

    SciTech Connect (OSTI)

    Fletcher, S.K.; Jansma, R.; Lim, J.; Murphy, M.; Wyss, G.

    1995-07-01

    When software is used in safety-critical, security-critical, or mission-critical situations, it is imperative to understand and manage the risks involved. A risk assessment methodology and toolset have been developed which are specific to software systems. This paper describes the concepts of the methodology, with emphasis on the experience of designing a toolset to support the methodology. Also presented are results of applying the methodology to two real software-based products: the software toolset itself, and a network firewall.

  4. Risk Informed Margins Management as part of Risk Informed Safety Margin Characterization

    SciTech Connect (OSTI)

    Curtis Smith

    2014-06-01

    The ability to better characterize and quantify safety margin is important to improved decision making about Light Water Reactor (LWR) design, operation, and plant life extension. A systematic approach to characterization of safety margins and the subsequent margin management options represents a vital input to the licensee and regulatory analysis and decision making that will be involved. In addition, as research and development in the LWR Sustainability (LWRS) Program and other collaborative efforts yield new data, sensors, and improved scientific understanding of physical processes that govern the aging and degradation of plant SSCs needs and opportunities to better optimize plant safety and performance will become known. To support decision making related to economics, readability, and safety, the Risk Informed Safety Margin Characterization (RISMC) Pathway provides methods and tools that enable mitigation options known as risk informed margins management (RIMM) strategies.

  5. Development and Demonstration of Advanced Forecasting, Power and Environmental Planning and Management Tools and Best Practices

    Broader source: Energy.gov [DOE]

    Development and Demonstration of Advanced Forecasting, Power and Environmental Planning and Management Tools and Best Practices

  6. The building codes and the forgotten basics of risk management

    SciTech Connect (OSTI)

    Norte, M.

    1995-12-01

    Building codes specifically developed to identify and manage chronic, endemic, facilities, risks, and the information and monitoring resources that must support them, are fundamental elements of a broadly based and comprehensive system of conventional risk management and compliance processes. This presentation discusses the proper role of building codes in atruly mature risk management and regulatory compliance strategy.

  7. Tank waste remediation system tank waste retrieval risk management plan

    SciTech Connect (OSTI)

    Klimper, S.C.

    1997-11-07

    This Risk Management Plan defines the approach to be taken to manage programmatic risks in the TWRS Tank Waste Retrieval program. It provides specific instructions applicable to TWR, and is used to supplement the guidance given by the TWRS Risk Management procedure.

  8. A risk assessment software tool for evaluating potential risks to human health and the environment

    SciTech Connect (OSTI)

    Drendel, G.; Allen, B.; Gentry, R.; Shipp, A.; Van Landingham, C.

    1994-12-31

    The Ecology and National Environmental Policy Act Division (END), is providing a sitewide evaluation of alternative strategies for the final disposition of the Rocky Flats Plant material inventory. This analysis is known as the Systems Engineering Analysis (SEA) for the Rocky Flats Plant. The primary intent of the SEA is to support the Rocky Flats Plant decision-making. As part of the SEA project, a risk assessment software tool has been developed which will assist in the analysis by providing an evaluation of potential risks to human health and the environment for the purpose of augmenting future decisions at the site.

  9. Taking Risk Assessment and Management to the Next Level: Program-Level Risk Analysis to Enable Solid Decision-Making on Priorities and Funding

    SciTech Connect (OSTI)

    Nelson, J. G.; Morton, R. L.; Castillo, C.; Dyer, G.; Johnson, N.; McSwain, J. T.

    2011-02-01

    A multi-level (facility and programmatic) risk assessment was conducted for the facilities in the Nevada National Security Site (NNSS) Readiness in Technical Base and Facilities (RTBF) Program and results were included in a new Risk Management Plan (RMP), which was incorporated into the fiscal year (FY) 2010 Integrated Plans. Risks, risk events, probability, consequence(s), and mitigation strategies were identified and captured, for most scope areas (i.e., risk categories) during the facilitated risk workshops. Risk mitigations (i.e., efforts in addition to existing controls) were identified during the facilitated risk workshops when the risk event was identified. Risk mitigation strategies fell into two broad categories: threats or opportunities. Improvement projects were identified and linked to specific risks they mitigate, making the connection of risk reduction through investments for the annual Site Execution Plan. Due to the amount of that was collected, analysis to be performed, and reports to be generated, a Risk Assessment/ Management Tool (RAMtool) database was developed to analyze the risks in real-time, at multiple levels, which reinforced the site-level risk management process and procedures. The RAMtool database was developed and designed to assist in the capturing and analysis of the key elements of risk: probability, consequence, and impact. The RAMtool calculates the facility-level and programmatic-level risk factors to enable a side-by-side comparison to see where the facility manager and program manager should focus their risk reduction efforts and funding. This enables them to make solid decisions on priorities and funding to maximize the risk reduction. A more active risk management process was developed where risks and opportunities are actively managed, monitored, and controlled by each facility more aggressively and frequently. risk owners have the responsibility and accountability to manage their assigned risk in real-time, using the RAMtool database.

  10. IP address management : augmenting Sandia's capabilities through open source tools.

    SciTech Connect (OSTI)

    Nayar, R. Daniel

    2005-08-01

    Internet Protocol (IP) address management is an increasingly growing concern at Sandia National Laboratories (SNL) and the networking community as a whole. The current state of the available IP addresses indicates that they are nearly exhausted. Currently SNL doesn't have the justification to obtain more IP address space from Internet Assigned Numbers Authority (IANA). There must exist a local entity to manage and allocate IP assignments efficiently. Ongoing efforts at Sandia have been in the form of a multifunctional database application notably known as Network Information System (NWIS). NWIS is a database responsible for a multitude of network administrative services including IP address management. This study will explore the feasibility of augmenting NWIS's IP management capabilities utilizing open source tools. Modifications of existing capabilities to better allocate available IP address space are studied.

  11. TWRS safety and technical integration risk management plan

    SciTech Connect (OSTI)

    Fordham, R.A.

    1996-03-12

    The objectives of the Tank Waste Remediation System (TWRS) Safety and Technical Integration (STI) programmatic risk management program are to assess, analyze, and handle risks associated with TWRS STI responsibilities and to communicate information about the actions being taken and the results to enable decision making. The objective of this TWRS STI Risk Management Plan is to communicate a consistent approach to risk management that will be used by the organization.

  12. Risk Management for Sodium Fast Reactors.

    SciTech Connect (OSTI)

    Denman, Matthew R; Groth, Katrina; Cardoni, Jeffrey N; Wheeler, Timothy A.

    2015-01-01

    Accident management is an important component to maintaining risk at acceptable levels for all complex systems, such as nuclear power plants. With the introduction of self - correcting, or inherently safe, reactor designs the focus has shifted from management by operators to allowing the syste m's design to manage the accident. While inherently and passively safe designs are laudable, extreme boundary conditions can interfere with the design attributes which facilitate inherent safety , thus resulting in unanticipated and undesirable end states. This report examines an inherently safe and small sodium fast reactor experiencing a beyond design basis seismic event with the intend of exploring two issues : (1) can human intervention either improve or worsen the potential end states and (2) can a Bayes ian Network be constructed to infer the state of the reactor to inform (1). ACKNOWLEDGEMENTS The author s would like to acknowledge the U.S. Department of E nergy's Office of Nuclear Energy for funding this research through Work Package SR - 14SN100303 under the Advanced Reactor Concepts program. The authors also acknowledge the PRA teams at A rgonne N ational L aborator y , O ak R idge N ational L aborator y , and I daho N ational L aborator y for their continue d contributions to the advanced reactor PRA mission area.

  13. Risk Assessment Tool - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Risk Assessment Technical Experts Working Group Risk Assessment Technical Experts Working Group The Risk Assessment Technical Experts Working Group (RWG) is established to assist DOE in the appropriate and effective use of quantitative risk assessment in nuclear safety related activities. The activities of the group will help DOE ensure that risk assessments supporting nuclear safety decisions are conducted in a consistent manner, of appropriate quality, properly tailored to the needs of the

  14. Assistant Director, Credit Modeling and Transaction Risk Management Division

    Broader source: Energy.gov [DOE]

    The Risk Management Division (RMD) is the group within the U.S. Department of Energys Loan Program Office (LPO) that is responsible for oversight of all risks that have the potential to impede the...

  15. Supply Chain Risk Management (SCRM) Awareness Toolkit | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Supply Chain Risk Management (SCRM) Awareness Toolkit Supply Chain Risk Management (SCRM) Awareness Toolkit The Office of the Chief Information Officer (OCIO) Supply Chain Risk Management (SCRM) Resource Center developed the SCRM Awareness Toolkit to introduce DOE employees to the basic terms and concepts of the technology supply chain and associated threats. For additional information on the DOE Enterprise SCRM Resource Center and program initiatives, please contact Sue Farrand at

  16. Cybersecurity Risk Management Process (RMP) Guideline - Final (May 2012) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Risk Management Process (RMP) Guideline - Final (May 2012) Cybersecurity Risk Management Process (RMP) Guideline - Final (May 2012) This electricity subsector cybersecurity Risk Management Process (RMP) guideline was developed by the Department of Energy, in collaboration with the National Institute of Standards and Technology (NIST) and the North American Electric Reliability Corporation (NERC). The RMP is written with the goal of enabling organizations- regardless of

  17. DOE Releases Electricity Subsector Cybersecurity Risk Management Process

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (RMP) Guideline | Department of Energy Electricity Subsector Cybersecurity Risk Management Process (RMP) Guideline DOE Releases Electricity Subsector Cybersecurity Risk Management Process (RMP) Guideline May 23, 2012 - 9:30am Addthis News Media Contact: (202) 586-4940 For Immediate Release: May 23, 2012 Department of Energy Releases Electricity Subsector Cybersecurity Risk Management Process (RMP) Guideline Public-Private Sector Collaboration Produces Guidance to Help Electric Utilities

  18. WPN 12-4: Weatherization Assistance Program Financial Management Training Tool Kit

    Broader source: Energy.gov [DOE]

    To issue the Financial Management Training Tool Kit to all Grantee for use in the Weatherization Assistance Program.

  19. United States Environmental Protection Agency: Use of risk assessment and risk management methodologies. Master's thesis

    SciTech Connect (OSTI)

    Lamuro, R.J.

    1992-09-30

    Make a full investigation of the policy implications and appropriate uses of risk assessment and risk management in regulatory programs under various Federal laws to prevent cancer and other chronic health effects which may result from exposure to hazardous substances. This is the primary mission of the Risk Assessment and Management Commission (Risk Commission). The Clean Air Act Amendments of 1990 (CAAA), created the Risk Commission reflecting Congress' concern over agency use of risk assessment and risk management techniques and methodologies to implement federal laws protective of human health. The Risk Commission is to consider: methods for measuring and describing risks of chronic health effects from hazardous substances; methods to reflect uncertainties associated with estimation techniques, and whether it is possible or desirable to develop a consistent risk assessment methodology or a consistent standard of acceptable risk for various federal programs.

  20. Enterprise Risk Management Framework - DOE Directives, Delegations, and

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Requirements Framework by Website Administrator PDF document icon Enterprise_Risk_Managment_Framework.pdf - PDF document, 359 KB (368207

  1. Enterprise Risk Management Model - DOE Directives, Delegations, and

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Requirements Model by Website Administrator PDF document icon Enterprise_Risk_Management_Model.pdf - PDF document, 863 KB (884517

  2. "Insurance as a Risk Management Instrument for Energy Infrastructure...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Infrastructure Security and Resilience" Report (March 2013) "Insurance as a Risk Management Instrument for Energy Infrastructure Security and Resilience" Report (March 2013) The ...

  3. Statistical tools for prognostics and health management of complex systems

    SciTech Connect (OSTI)

    Collins, David H; Huzurbazar, Aparna V; Anderson - Cook, Christine M

    2010-01-01

    Prognostics and Health Management (PHM) is increasingly important for understanding and managing today's complex systems. These systems are typically mission- or safety-critical, expensive to replace, and operate in environments where reliability and cost-effectiveness are a priority. We present background on PHM and a suite of applicable statistical tools and methods. Our primary focus is on predicting future states of the system (e.g., the probability of being operational at a future time, or the expected remaining system life) using heterogeneous data from a variety of sources. We discuss component reliability models incorporating physical understanding, condition measurements from sensors, and environmental covariates; system reliability models that allow prediction of system failure time distributions from component failure models; and the use of Bayesian techniques to incorporate expert judgments into component and system models.

  4. Managing the Risks of Climate Change and Terrorism

    SciTech Connect (OSTI)

    Rosa, Eugene; Dietz, Tom; Moss, Richard H.; Atran, Scott; Moser, Susanne

    2012-04-07

    Society has difficult decisions to make about how best to allocate its resources to ensure future sustainability. Risk assessment can be a valuable tool: it has long been used to support decisions to address environmental problems. But in a time when the risks to sustainability range from climate change to terrorism, applying risk assessment to sustainability will require careful rethinking. For new threats, we will need a new approach to risk assessment.

  5. IEA-Risk Quantification and Risk Management in Renewable Energy...

    Open Energy Info (EERE)

    Energy Topics: Finance, Implementation, Market analysis Resource Type: Presentation, Lessons learnedbest practices Website: www.iea-retd.orgfilesRISK%20IEA-RETD%20(2011-6)....

  6. Mathematics, Pricing, Market Risk Management and Trading Strategies for Financial Derivatives (2/3)

    ScienceCinema (OSTI)

    None

    2011-10-06

    Market Trading and Risk Management of Vanilla FX Options - Measures of Market Risk - Implied Volatility - FX Risk Reversals, FX Strangles - Valuation and Risk Calculations - Risk Management - Market Trading Strategies

  7. Continuing Developments in PV Risk Management: Strategies, Solutions, and Implications

    SciTech Connect (OSTI)

    Lowder, T.; Mendelsohn, M.; Speer, B.; Hill, R.

    2013-02-01

    As the PV industry matures, successful risk management practices will become more imperative to ensure investor confidence, control costs, and facilitate further growth. This report discusses several key aspects of risk management during the commercial- and utility-scale project life cycle, from identification of risks, to the process of mitigating and allocating those risks among project parties, to transferring those risks through insurance. The report also explores novel techniques in PV risk management, options to offload risks onto the capital markets, and innovative insurance policies (namely warranty policies) that address risks unique to the PV sector. One of the major justifications for robust risk management in the PV industry is the cost-reduction opportunities it affords. If the PV industry can demonstrate the capability to successfully manage its risks, thereby inspiring confidence in financiers, it may be able to obtain a lower cost of capital in future transactions. A lower cost of capital translates to a lower cost of energy, which will in turn enhance PV?s competitiveness at a time when it will have to rely less on subsidies to support its market penetration.

  8. New Tools to Monitor Carbon Storage Risks Released for Testing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    February 11, 2016 - 10:37am Addthis Carbon Storage Model Carbon Storage Model The National Risk Assessment Partnership (NRAP), led by the U.S. Department of Energy's (DOE) National ...

  9. DOE - Office of Legacy Management -- Era Tool and Engineering...

    Office of Legacy Management (LM)

    Era Tool and Engineering Co - IL 29 FUSRAP Considered Sites Site: Era Tool and Engineering Co. (IL.29 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated...

  10. Integrated Waste Treatment Unit GFSI Risk Management Plan

    SciTech Connect (OSTI)

    W. A. Owca

    2007-06-21

    This GFSI Risk Management Plan (RMP) describes the strategy for assessing and managing project risks for the Integrated Waste Treatment Unit (IWTU) that are specifically within the control and purview of the U.S. Department of Energy (DOE), and identifies the risks that formed the basis for the DOE contingency included in the performance baseline. DOE-held contingency is required to cover cost and schedule impacts of DOE activities. Prior to approval of the performance baseline (Critical Decision-2) project cost contingency was evaluated during a joint meeting of the Contractor Management Team and the Integrated Project Team for both contractor and DOE risks to schedule and cost. At that time, the contractor cost and schedule risk value was $41.3M and the DOE cost and schedule risk contingency value is $39.0M. The contractor cost and schedule risk value of $41.3M was retained in the performance baseline as the contractor's management reserve for risk contingency. The DOE cost and schedule risk value of $39.0M has been retained in the performance baseline as the DOE Contingency. The performance baseline for the project was approved in December 2006 (Garman 2006). The project will continue to manage to the performance baseline and change control thresholds identified in PLN-1963, ''Idaho Cleanup Project Sodium-Bearing Waste Treatment Project Execution Plan'' (PEP).

  11. A phased approach to induced seismicity risk management

    SciTech Connect (OSTI)

    White, Joshua A.; Foxall, William

    2014-01-01

    This work describes strategies for assessing and managing induced seismicity risk during each phase of a carbon storage project. We consider both nuisance and damage potential from induced earthquakes, as well as the indirect risk of enhancing fault leakage pathways. A phased approach to seismicity management is proposed, in which operations are continuously adapted based on available information and an on-going estimate of risk. At each project stage, specific recommendations are made for (a) monitoring and characterization, (b) modeling and analysis, and (c) site operations. The resulting methodology can help lower seismic risk while ensuring site operations remain practical and cost-effective.

  12. A phased approach to induced seismicity risk management

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    White, Joshua A.; Foxall, William

    2014-01-01

    This work describes strategies for assessing and managing induced seismicity risk during each phase of a carbon storage project. We consider both nuisance and damage potential from induced earthquakes, as well as the indirect risk of enhancing fault leakage pathways. A phased approach to seismicity management is proposed, in which operations are continuously adapted based on available information and an on-going estimate of risk. At each project stage, specific recommendations are made for (a) monitoring and characterization, (b) modeling and analysis, and (c) site operations. The resulting methodology can help lower seismic risk while ensuring site operations remain practical andmore » cost-effective.« less

  13. Planning Tools For Seismic Risk Mitigation. Rules And Applications

    SciTech Connect (OSTI)

    De Paoli, Rosa Grazia

    2008-07-08

    Recently, Italian urban planning research in the field of seismic risk mitigation are renewing. In particular, it promotes strategies that integrate urban rehabilitation and aseismic objectives, and also politicizes that are directed to revitalizes urban systems, coupling physical renewal and socio-economic development.In Italy the first law concerning planning for seismic mitigation dates back 1974, the law n. 64 'Regulation for buildings with particular rules for the seismic areas' where the rules for buildings in seismic areas concerning also the local hazard. This law, in fact, forced the municipalities to acquire, during the formation of the plans, a preventive opinion of compatibility between planning conditions and geomorphology conditions of the territory. From this date the conviction that the seismic risk must be considered inside the territorial planning especially in terms of strategies of mitigation has been strengthened.The town planners have started to take an interest in seismic risk in the [80]s when the Irpinia's earthquake took place. The researches developed after this earthquake have established that the principal cause of the collapse of buildings are due to from the wrong location of urban settlements (on slopes or crowns) After Irpinia's earthquake the first researches on seismic risk mitigation, in particular on the aspects related to the hazards and to the urban vulnerability were made.

  14. Risk Reduction with a Fuzzy Expert Exploration Tool

    SciTech Connect (OSTI)

    Weiss, William W.; Broadhead, Ron

    2002-06-27

    In the first three years of the Fee Tool Project, an immense amount of data on the Delaware Basin has been accumulated. Data on geology, structure, production, regional information such as gravity as well as local data, such as well logs. This data, organized and cataloged into several online databases, is available for the Expert System and users as needed and as appropriate in analyzing production potential.

  15. AN ADVANCED TOOL FOR APPLIED INTEGRATED SAFETY MANAGEMENT

    SciTech Connect (OSTI)

    Potts, T. Todd; Hylko, James M.; Douglas, Terence A.

    2003-02-27

    WESKEM, LLC's Environmental, Safety and Health (ES&H) Department had previously assessed that a lack of consistency, poor communication and using antiquated communication tools could result in varying operating practices, as well as a failure to capture and disseminate appropriate Integrated Safety Management (ISM) information. To address these issues, the ES&H Department established an Activity Hazard Review (AHR)/Activity Hazard Analysis (AHA) process for systematically identifying, assessing, and controlling hazards associated with project work activities during work planning and execution. Depending on the scope of a project, information from field walkdowns and table-top meetings are collected on an AHR form. The AHA then documents the potential failure and consequence scenarios for a particular hazard. Also, the AHA recommends whether the type of mitigation appears appropriate or whether additional controls should be implemented. Since the application is web based, the information is captured into a single system and organized according to the >200 work activities already recorded in the database. Using the streamlined AHA method improved cycle time from over four hours to an average of one hour, allowing more time to analyze unique hazards and develop appropriate controls. Also, the enhanced configuration control created a readily available AHA library to research and utilize along with standardizing hazard analysis and control selection across four separate work sites located in Kentucky and Tennessee. The AHR/AHA system provides an applied example of how the ISM concept evolved into a standardized field-deployed tool yielding considerable efficiency gains in project planning and resource utilization. Employee safety is preserved through detailed planning that now requires only a portion of the time previously necessary. The available resources can then be applied to implementing appropriate engineering, administrative and personal protective equipment controls in the field.

  16. Risk analysis tools for force protection and infrastructure/asset protection

    SciTech Connect (OSTI)

    Jaeger, C.D.; Duggan, R.A.; Paulus, W.K.

    1998-09-01

    The Security Systems and Technology Center at Sandia National Laboratories has for many years been involved in the development and use of vulnerability assessment and risk analysis tools. In particular, two of these tools, ASSESS and JTS, have been used extensively for Department of Energy facilities. Increasingly, Sandia has been called upon to evaluate critical assets and infrastructures, support DoD force protection activities and assist in the protection of facilities from terrorist attacks using weapons of mass destruction. Sandia is involved in many different activities related to security and force protection and is expanding its capabilities by developing new risk analysis tools to support a variety of users. One tool, in the very early stages of development, is EnSURE, Engineered Surety Using the Risk Equation. EnSURE addresses all of the risk equation and integrates the many components into a single, tool-supported process to help determine the most cost-effective ways to reduce risk. This paper will briefly discuss some of these risk analysis tools within the EnSURE framework.

  17. Marine and Hydrokinetic Technology Development Risk Management...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Bureau of Shipping ALARA as low as reasonably achievable API ... of Knowledge PMI Project Management Institute PTO power ... TPL technology performance level TRL technology readiness ...

  18. New Cost Tool Helps Fleet Managers Evaluate Hybrid Vehicles - News Releases

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    | NREL New Cost Tool Helps Fleet Managers Evaluate Hybrid Vehicles August 3, 2005 Golden, Colo. - A new software tool that compares the costs and emissions of hybrid electric vehicles (HEVs) to conventional vehicles is now available for government and business fleet managers interested in reducing fuel costs and protecting air quality. The tool, called the Hybrid Electric Vehicle Fleet Cost and Benefits Calculator Tool, was developed by the U.S. Department of Energy's (DOE's) National

  19. Microsoft Word - EM_CM_3_Risk_Management_Best Practices and Gaps...

    Energy Savers [EERE]

    EMCM3RiskManagementBest Practices and Gaps.doc Microsoft Word - EMCM3RiskManagementBest Practices and Gaps.doc Microsoft Word - EMCM3RiskManagementBest Practices and...

  20. New Executive Order Establishes a Federal Flood Risk Management Standard

    Broader source: Energy.gov [DOE]

    President Obama signed Executive Order (E.O.) 13690, Establishing a Federal Flood Risk Management Standard and a Process for Further Soliciting and Considering Stakeholder Input, on January 30, 2015.

  1. New Executive Order Establishes a Federal Flood Risk Management...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (E.O.) 13690, Establishing a Federal Flood Risk Management Standard and a Process for Further Soliciting and Considering Stakeholder Input, on January 30, 2015. The new E.O. ...

  2. Managing the Risks of Climate Change and Terrorism

    SciTech Connect (OSTI)

    Rosa, Eugene; Dietz, Tom; Moss, Richard H.; Atran, Scott; Moser, Susanne

    2012-04-07

    The article describes challenges to comparative risk assessment, a key approach for managing uncertainty in decision making, across diverse threats such as terrorism and climate change and argues new approaches will be particularly important in addressing decisions related to sustainability.

  3. Energy Department Seeks Information on Geothermal Risk and Uncertainty Management

    Broader source: Energy.gov [DOE]

    The Energy Department's Office of Energy Efficiency and Renewable Energy (EERE) has issued a Request for Information (RFI) to help quantify and manage risk in geothermal exploration, in an effort...

  4. APPLICATION OF RISK MANAGEMENT PRACTICES TO NNSA TRITIUM READINESS SUBPROGRAM

    SciTech Connect (OSTI)

    Shete, S; Srini Venkatesh, S

    2007-01-31

    The National Nuclear Security Administration (NNSA), Office of Stockpile Technology (NNSA/NA-123) chartered a risk assessment of the Tritium Readiness (TR) Subprogram to identify risks and to develop handling strategies with specific action items that could be scheduled and tracked to completion in order to minimize program failures. This assessment was performed by a team of subject matter experts (SMEs) comprised of representatives from various organizations participating in the TR Subprogram. The process was coordinated by Savannah River Site, Systems Engineering (SRS/SE) with support from Subprogram Team. The Risk Management Process steps performed during this risk assessment were: Planning, Identification, Grading, Handling, and Impact Determination. All of the information captured during the risk assessment was recorded in a database. The team provided estimates for the cost and schedule impacts of implementing the recommended handling strategies and facilitated the risk based cost contingency analysis. The application of the Risk Management Practices to the NNSA Tritium Readiness Subprogram resulted in: (1) The quarterly review and update of the Risk Management Database to include an evaluation of all existing risks and the identification/evaluation of any potential new risks. (2) The risk status and handling strategy action item tracking mechanism that has visibility and buy-in throughout the Tritium Readiness Subprogram to ensure that approved actions are completed as scheduled and that risk reduction is being achieved. (3) The generation of a risk-based cost contingency estimate that may be used by the Tritium Readiness Subprogram Manager in establishing future year program budgets.

  5. Deactivation & Decommissioning Knowledge Management Information Tool (D&D

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    KM-IT) | Department of Energy Knowledge Management Information Tool (D&D KM-IT) Deactivation & Decommissioning Knowledge Management Information Tool (D&D KM-IT) Deactivation & Decommissioning Knowledge Management Information Tool (D&D KM-IT) The Deactivation and Decommissioning Knowledge Management Information Tool (D&D KM-IT) serves as a centralized repository providing a common interface for all D&D related activities. It assists users in gathering, analyzing,

  6. Risk Management Process Overview | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The process is designed to 1) accommodate any size or type of organization; 2) support a mission and business focused approach, and 3) support improved communication of risk across ...

  7. AUDIT REPORT The Department of Energy's Cybersecurity Risk Management Framework

    Energy Savers [EERE]

    Cybersecurity Risk Management Framework DOE-OIG-16-02 November 2015 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 November 4, 2015 MEMORANDUM FOR THE SECRETARY FROM: Rickey R. Hass Acting Inspector General SUBJECT: INFORMATION: Audit Report: "The Department of Energy's Cybersecurity Risk Management Framework" BACKGROUND Cyber attacks on information systems have become aggressive, disciplined,

  8. Enterprise Risk Management (ERM) Framework for Directives

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2012-09-30

    Explains the new ERM framework for developing, revising, and reviewing directives. This memo directs the Office of Management to institutionalize ERM into the directives process no later than September 30, 2012.

  9. CRiSTAL Project Management Tool | Open Energy Information

    Open Energy Info (EERE)

    modeling tools User Interface: Spreadsheet Website: www.iisd.orgcristaltool Cost: Free Language: "English, French, Portuguese, Spanish; Castilian" is not in the list of...

  10. Getting Data Center Energy Management Started with Profiler Tools

    Broader source: Energy.gov [DOE]

    Webinar will introduce the Data Center Profiler (DC Pro) Tools available to help data centers estimate power usage effectiveness (PUE) without submetering.

  11. Risk and Work Configuration Management as a Function of Integrated Safety Management

    SciTech Connect (OSTI)

    Lana Buehrer, Michele Kelly, Fran Lemieux, Fred Williams

    2007-11-30

    National Security Technologies, LLC (NSTec), has established a work management program and corresponding electronic Facilities and Operations Management Information System (e-FOM) to implement Integrated Safety Management (ISM). The management of work scopes, the identification of hazards, and the establishment of implementing controls are reviewed and approved through electronic signatures. Through the execution of the program and the implementation of the electronic system, NSTec staff work within controls and utilize feedback and improvement process. The Integrated Work Control Manual further implements the five functions of ISM at the Activity level. By adding the Risk and Work Configuration Management program, NSTec establishes risk acceptance (business and physical) for liabilities within the performance direction and work management processes. Requirements, roles, and responsibilities are specifically identified in the program while e-FOM provides the interface and establishes the flowdown from the Safety Chain to work and facilities management processes to company work-related directives, and finally to Subject Matter Expert concurrence. The Program establishes, within the defined management structure, management levels for risk identification, risk mitigation (controls), and risk acceptance (business and physical) within the Safety Chain of Responsibility. The Program also implements Integrated Safeguards and Security Management within the NSTec Safety Chain of Responsibility. Once all information has been entered into e-FOM, approved, and captured as data, the information becomes searchable and sortable by hazard, location, organization, mitigating controls, etc.

  12. Cyber Security Requirements for Risk Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2004-02-19

    The Notice ensures that system owners consistently assess the threats to and vulnerabilities of systems in order to implement adequate security controls. The Notice will also ensure compliance with the requirements of DOE O 205.1, Department of Energy Cyber Security Management Program, dated 3-21-03, and protect DOE information and information systems from unauthorized access, use, disclosure, modification, or destruction. DOE N 205.15, dated 3/18/05, extends this directive until 3/18/06.

  13. Preservation technologies; tools for enhanced cultural resource management

    SciTech Connect (OSTI)

    Culbertson, J.D.

    1995-12-01

    Legislation enacted since the mid sixties has defined requirements for cultural resource management. This is an important area of environmental management that has received only limited attention. Cultural resources are integral to environmental systems; they need to be considered in any resource management activities. They also provide important information about long term changes in environmental systems and the effects of human activity.

  14. DOE - Office of Legacy Management -- Landis Machine Tool Co ...

    Office of Legacy Management (LM)

    Also see Documents Related to LANDIS MACHINE TOOL CO. PA.34-1 - DOE Memorandum; A. Williams to the File; Subject: Elimination of the Landis Machine Company site; April 24, 1991...

  15. DOE - Office of Legacy Management -- Bloomfield Tool Co - NJ 21

    Office of Legacy Management (LM)

    Bloomfield Tool Co - NJ 21 FUSRAP Considered Sites Site: Bloomfield Tool Co. (NJ.21 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Bloomfield , New Jersey NJ.21-1 Evaluation Year: 1987 NJ.21-2 Site Operations: During a small-scale experiment, uranium slugs were machined. NJ.21-3 Site Disposition: Eliminated - Potential for contamination considered remote due to limited scope and duration of the operations NJ.21-4 Radioactive Materials

  16. DOE Project Management Risk Committee (PMRC) SOP | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Management Risk Committee (PMRC) SOP DOE Project Management Risk Committee (PMRC) SOP In addition to the PMRC Charter, this PMRC SOP serves as a reference for the PMRC Secretariat and Programs on the processes and procedures for how the PMRC is conducted and operates. The SOP also serves as a reference to assist Programs and project teams on how to interface with and prepare for sessions with the PMRC. April 21, 2016 PDF icon DOE PMRC SOP Key Resources PMCDP EVMS PARS IIe FPD Resource

  17. Tools for Forest Carbon Inventory, Management, and Reporting...

    Open Energy Info (EERE)

    of carbon in forests are crucial for forest carbon management, carbon credit trading, national reporting of greenhouse gas inventories to the United Nations Framework...

  18. MO-E-9A-01: Risk Based Quality Management: TG100 In Action

    SciTech Connect (OSTI)

    Huq, M; Palta, J; Dunscombe, P; Thomadsen, B

    2014-06-15

    One of the goals of quality management in radiation therapy is to gain high confidence that patients will receive the prescribed treatment correctly. To accomplish these goals professional societies such as the American Association of Physicists in Medicine (AAPM) has published many quality assurance (QA), quality control (QC), and quality management (QM) guidance documents. In general, the recommendations provided in these documents have emphasized on performing device-specific QA at the expense of process flow and protection of the patient against catastrophic errors. Analyses of radiation therapy incidents find that they are most often caused by flaws in the overall therapy process, from initial consult through final treatment, than by isolated hardware or computer failures detectable by traditional physics QA. This challenge is shared by many intrinsically hazardous industries. Risk assessment tools and analysis techniques have been developed to define, identify, and eliminate known and/or potential failures, problems, or errors, from a system, process and/or service before they reach the customer. These include, but are not limited to, process mapping, failure modes and effects analysis (FMEA), fault tree analysis (FTA), and establishment of a quality management program that best avoids the faults and risks that have been identified in the overall process. These tools can be easily adapted to radiation therapy practices because of their simplicity and effectiveness to provide efficient ways to enhance the safety and quality of treatment processes. Task group 100 (TG100) of AAPM has developed a risk-based quality management program that uses these tools. This session will be devoted to a discussion of these tools and how these tools can be used in a given radiotherapy clinic to develop a risk based QM program. Learning Objectives: Learn how to design a process map for a radiotherapy process. Learn how to perform a FMEA analysis for a given process. Learn what Fault tree analysis is all about. Learn how to design a quality management program based upon the information obtained from process mapping, FMEA and FTA.

  19. Risk assessment and management of radiofrequency radiation exposure

    SciTech Connect (OSTI)

    Dabala, Dana; Surducan, Emanoil; Surducan, Vasile; Neamtu, Camelia

    2013-11-13

    Radiofrequency radiation (RFR) industry managers, occupational physicians, security department, and other practitioners must be advised on the basic of biophysics and the health effects of RF electromagnetic fields so as to guide the management of exposure. Information on biophysics of RFR and biological/heath effects is derived from standard texts, literature and clinical experiences. Emergency treatment and ongoing care is outlined, with clinical approach integrating the circumstances of exposure and the patient's symptoms. Experimental risk assessment model in RFR chronic exposure is proposed. Planning for assessment and monitoring exposure, ongoing care, safety measures and work protection are outlining the proper management.

  20. Knowledge Discovery, Knowledge Management and Enterprise-Wide Information Technology Tools Final Report

    SciTech Connect (OSTI)

    Patton, Robert M; Symons, Christopher T; Gorman, Bryan L; Treadwell, Jim N

    2012-04-01

    A final report on an ORNL task to establish a knowledge discovery and management tool to retrieve and recommend information from existing S&T documents for the Office of Naval Research Global.

  1. Preparing for CAAA risk management plans: The lessons of OSHA PSM process safety management

    SciTech Connect (OSTI)

    Gillespie, D.P. [Control Systems Consultants, Inc., Ashland, KY (United States)

    1994-12-31

    29 CFR 1910.119 OSHA Process Safety Management (PSM) became law in 1992, presenting covered facilities with extraordinarily comprehensive and demanding requirements for information management. This paper reports an approach adopted by petrochemical plants that have pioneered automated, integrated compliance with PSM information requirements. The approach is worthy of consideration by the many additional plants that will be covered by 40 CFR Part 67 Risk Management Programs for Chemical Accidental Release Prevention (RNT), which closely parallels PSM`s information requirements.

  2. A mathematically guided strategy for risk assessment and management.

    SciTech Connect (OSTI)

    Cooper, James Arlin

    2005-03-01

    Strategies for risk assessment and management of high consequence operations are often based on factors such as physical analysis, analysis of software and other logical processing, and analysis of statistically determined human actions. Conventional analysis methods work well for processing objective information. However, in practical situations, much or most of the data available are subjective. Also, there are potential resultant pitfalls where conventional analysis might be unrealistic, such as improperly using event tree and fault tree failure descriptions where failures or events are soft (partial) rather than crisp (binary), neglecting or misinterpreting dependence (positive, negative, correlation), and aggregating nonlinear contributions linearly. There are also personnel issues that transcend basic human factors statistics. For example, sustained productivity and safety in critical operations can depend on the morale of involved personnel. In addition, motivation is significantly influenced by 'latent effects', which are pre-occurring influences. This paper addresses these challenges and proposes techniques for subjective risk analysis, latent effects risk analysis and a hybrid analysis that also includes objective risk analysis. The goal is an improved strategy for risk management.

  3. Microsoft Word - EM_CM_3_Risk_Management_Best Practices and Gaps...

    Energy Savers [EERE]

    risk procedures; available personnel and their skill levels relative to risk management; and available data and its validation. Attachment 2 lists the Best Practices...

  4. RESRAD for Radiological Risk Assessment. Comparison with EPA CERCLA Tools - PRG and DCC Calculators

    SciTech Connect (OSTI)

    Yu, C.; Cheng, J. -J.; Kamboj, S.

    2015-07-01

    The purpose of this report is two-fold. First, the risk assessment methodology for both RESRAD and the EPA’s tools is reviewed. This includes a review of the EPA’s justification for 2 using a dose-to-risk conversion factor to reduce the dose-based protective ARAR from 15 to 12 mrem/yr. Second, the models and parameters used in RESRAD and the EPA PRG and DCC Calculators are compared in detail, and the results are summarized and discussed. Although there are suites of software tools in the RESRAD family of codes and the EPA Calculators, the scope of this report is limited to the RESRAD (onsite) code for soil contamination and the EPA’s PRG and DCC Calculators also for soil contamination.

  5. Fairness hypothesis and managing the risks of societal technology choices

    SciTech Connect (OSTI)

    Cantor, R.; Rayner, S.

    1986-08-01

    Much of the literature on risk perception and management has asked how society should resolve the question, ''How safe is safe enough'' There has been political and technical disagreement over the types of answers that may be given, as well as over the social values attached to perceived probabilities and magnitudes of various outcomes. Despite controversy, there seems to have been a large measure of consensus that, ''How safe is safe enough'' is the right question to ask. This paper sets out to question that assumption. Various ingenious techniques of risk analysis have sought to discover the real risks inherent in various activities, but from a sociocultural viewpoint it can be seen that no single answer can be given to the problem of adequate safety in a complex society which contains a wide variety of perceptual biases about danger, expectations of the good life, and levels of demand for safety. The paper argues that, from a societal risk-management perspective, we should be addressing a different range of questions that views societal risk as a whole rather than as the sum of individual hazards. Resolving the question, ''How safe is safe enough'' is less important in making societal technology choices than ''How fair is safe enough.'' A recent empirical pilot study is reported which explored the fairness hypotheses in the context of nuclear power. The results indicate that the process of technology choice should recognize explicitly the preferred principles different parties hold with respect to obtaining consent from those affected by the risks, distributing the liabilities, and justifying trust in the relevant institutions. The paper closes with a discussion of future prospects for the fairness approach in areas such as noxious facility siting.

  6. Microsoft PowerPoint -Risk_Portfolio_Manager(RPM)_overview_Under...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PowerPoint - RiskPortfolioManager(RPM)overviewUnderSecDOE2011V4 Final 3-22-2011.ppt Read-Only Compatibili Microsoft PowerPoint - RiskPortfolioManager(RPM)overviewUn...

  7. NEAMS Nuclear Waste Management IPSC : evaluation and selection of tools for the quality environment.

    SciTech Connect (OSTI)

    Bouchard, Julie F.; Stubblefield, William Anthony; Vigil, Dena M.; Edwards, Harold Carter (Org. 1444 : Multiphysics Simulation Technology)

    2011-05-01

    The objective of the U.S. Department of Energy Office of Nuclear Energy Advanced Modeling and Simulation Nuclear Waste Management Integrated Performance and Safety Codes (NEAMS Nuclear Waste Management IPSC) is to provide an integrated suite of computational modeling and simulation (M&S) capabilities to quantitatively assess the long-term performance of waste forms in the engineered and geologic environments of a radioactive-waste storage facility or disposal repository. These M&S capabilities are to be managed, verified, and validated within the NEAMS Nuclear Waste Management IPSC quality environment. M&S capabilities and the supporting analysis workflow and simulation data management tools will be distributed to end-users from this same quality environment. The same analysis workflow and simulation data management tools that are to be distributed to end-users will be used for verification and validation (V&V) activities within the quality environment. This strategic decision reduces the number of tools to be supported, and increases the quality of tools distributed to end users due to rigorous use by V&V activities. This report documents an evaluation of the needs, options, and tools selected for the NEAMS Nuclear Waste Management IPSC quality environment. The objective of the U.S. Department of Energy (DOE) Office of Nuclear Energy Advanced Modeling and Simulation Nuclear Waste Management Integrated Performance and Safety Codes (NEAMS Nuclear Waste Management IPSC) program element is to provide an integrated suite of computational modeling and simulation (M&S) capabilities to assess quantitatively the long-term performance of waste forms in the engineered and geologic environments of a radioactive-waste storage facility or disposal repository. This objective will be fulfilled by acquiring and developing M&S capabilities, and establishing a defensible level of confidence in these M&S capabilities. The foundation for assessing the level of confidence is based upon the rigor and results from verification, validation, and uncertainty quantification (V&V and UQ) activities. M&S capabilities are to be managed, verified, and validated within the NEAMS Nuclear Waste Management IPSC quality environment. M&S capabilities and the supporting analysis workflow and simulation data management tools will be distributed to end-users from this same quality environment. The same analysis workflow and simulation data management tools that are to be distributed to end-users will be used for verification and validation (V&V) activities within the quality environment. This strategic decision reduces the number of tools to be supported, and increases the quality of tools distributed to end users due to rigorous use by V&V activities. NEAMS Nuclear Waste Management IPSC V&V and UQ practices and evidence management goals are documented in the V&V Plan. This V&V plan includes a description of the quality environment into which M&S capabilities are imported and V&V and UQ activities are managed. The first phase of implementing the V&V plan is to deploy an initial quality environment through the acquisition and integration of a set of software tools. An evaluation of the needs, options, and tools selected for the quality environment is given in this report.

  8. Process safety management (OSHA) and process risk management (CAA) application. Application to a coke plant

    SciTech Connect (OSTI)

    Graeser, W.C.; Mentzer, W.P.

    1995-12-01

    Risk Management Programs for Chemical Accidental Release Prevention is the name of the proposed rule for the RMP Risk Management Program. The RMP was written in response to several catastrophic releases of hazardous substances. The rule is applicable to facilities that store, process or use greater than threshold quantities of 62 listed flammable chemicals and another 100 listed toxic substances. Additionally, a Risk Management Plan is registered with the EPA, Chemical Safety and Hazardous Investigation Board, state governments and the local emergency planning commission. The Clean Air Act Amendments of 1990 (specifically Section 112r) required the EPA to develop a three phase Risk Management Plan for industry: prevention program; hazard assessment; and emergency response program. The Prevention Program closely follows the OSHA`s Process Safety Management Standard. The Hazard Assessment section requires facilities to develop plans for a worst case scenario. The Emergency Response section defines the steps the facility and each employee will take if a release occurs. This section also needs to be coordinated with the Local Emergency Planning Commission. These regulations are described using Clairton Works as an example of compliance.

  9. Interim Status Report for Risk Management for SFRs

    SciTech Connect (OSTI)

    Jankovsky, Zachary Kyle; Denman, Matthew R.; Groth, Katrina; Wheeler, Timothy A.

    2015-10-01

    Accident management is an important component to maintaining risk at acceptable levels for all complex systems, such as nuclear power plants. With the introduction of passive, or inherently safe, reactor designs the focus has shifted from management by operators to allowing the system's design to take advantage of natural phenomena to manage the accident. Inherently and passively safe designs are laudable, but nonetheless extreme boundary conditions can interfere with the design attributes which facilitate inherent safety, thus resulting in unanticipated and undesirable end states. This report examines an inherently safe and small sodium fast reactor experiencing a variety of beyond design basis events with the intent of exploring the utility of a Dynamic Bayesian Network to infer the state of the reactor to inform the operator's corrective actions. These inferences also serve to identify the instruments most critical to informing an operator's actions as candidates for hardening against radiation and other extreme environmental conditions that may exist in an accident. This reduction in uncertainty serves to inform ongoing discussions of how small sodium reactors would be licensed and may serve to reduce regulatory risk and cost for such reactors.

  10. Chasing a specter: Risk management for global environmental change

    SciTech Connect (OSTI)

    O'Riordan, T. ); Rayner, S. )

    1989-10-01

    Global environmental change is both a concept and a process that changes in meaning with scientific discovery, public concern, and political responsiveness. It is the relationship between the problems as perceived and the various institutions that help shape and adapt to such problems that defines global environmental change. There is a kind of race between scientific detective work and political adjustment to lessen the likely impacts that predictive science is trying to verify. Risk analysis, because of its capacity to recognize this relationship in many spheres of problem identification, can contribute to the political debate, mostly by proposing institutional redesign of the relationship among scientific research, public entry, and experimental readjustments to consensus formation and international action. This paper discusses the factors involved in global environmental change, the risk management involved, the holistic interpretation, and the environmental impacts. 21 refs., 5 figs., 5 tabs.

  11. Innovative Computational Tools for Reducing Exploration Risk Through Integration of Water-Rock Interactions and Magnetotelluric Surveys

    Broader source: Energy.gov [DOE]

    Innovative Computational Tools for Reducing Exploration Risk Through Integration of Water-Rock Interactions and Magnetotelluric Surveys presentation at the April 2013 peer review meeting held in Denver, Colorado.

  12. Tools

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tools Jon Dugan (acting) ESnet Director 
 Scientific Networking Division Director Inder Monga (Interim) Division Deputy for Technology Department Head for Research and Development Inder Monga Infrastructure Systems Brooklin Gore Office of the CTO Inder Monga Network Engineering and Operations TBD Advanced Network Technologies Brian Tierney Department Head for Networking and Systems Patty Giuntoli Division Deputy for Operations Susan Lucas Cybersecurity Denise Sumikawa Science Engagement Lauren

  13. Chemical risk management strategies for product stewardship and community partnership

    SciTech Connect (OSTI)

    Armstrong, C.E. )

    1993-01-01

    With the recent enactments of the environment, health and safety statutes, the once protective walls of an industrial facility are opening to the scrutiny of an inquisitive public. Indeed, the Emergency Planning and Community Right-to-Know Act (EPCRA), Process Safety Management under OSHA 1910.119, and Title III of the Clean Air Act Amendments impose substantial reporting requirements under the auspices of community right to know'' and require written program plans that must be submitted to become public documents. Through these Acts, the public and industry are becoming partners in the understanding and management of human health and environmental risks posed by the chemical inventories, processes, and emissions from an industrial facility. The types of information required by the Act to be available to the public can include quantities, locations, process throughputs, environmental fates, and emissions volumes of manufacturer-specific chemicals for certain industrial facilities. With their implementation of compliance measures with these requirements, industrial facilities have an opportunity to become a public educator about the chemicals they use in the process of making their products. By proactively soliciting a partnership with communities to learn about their concerns, companies can more effectively communicate risks to the public and provide a new kind of stewardship to their products.

  14. California Levee Risk, Now and in the Future:Identifying Research and Tool Development Needs

    SciTech Connect (OSTI)

    Newmark, R L; Hanemann, M; Farber, D

    2006-11-28

    The Center for Catastrophic Risk Management (CCRM) and the California Center for Environmental Law and Policy (CCELP) at UC Berkeley and the Lawrence Livermore National Laboratory (LLNL) joined together to cosponsor a workshop to define research requirements to mitigate the hazards facing the Sacramento-San Joaquin Delta Levee system. The Workshop was intended to provide a forum to (1) Report assessments of current vulnerabilities facing the levees, such as structural failure, seismic loading, flooding, terrorism; (2) Consider longer term challenges such as climate change, sea level rise; and (3) Define research requirements to fill gaps in knowledge and reduce uncertainties in hazard assessments.

  15. WM2014 Conference- Building the Community of Practice for Performance and Risk Assessment in Support of Risk-Informed Environmental Management Decisions

    Broader source: Energy.gov [DOE]

    WM2014 Conference - Building the Community of Practice for Performance and Risk Assessment in Support of Risk-Informed Environmental Management Decisions - 14575

  16. EO 13690: Establishing a Federal Flood Risk Management Standard and a

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Process for Further Soliciting and Considering Stakeholder Input (2015) | Department of Energy 690: Establishing a Federal Flood Risk Management Standard and a Process for Further Soliciting and Considering Stakeholder Input (2015) EO 13690: Establishing a Federal Flood Risk Management Standard and a Process for Further Soliciting and Considering Stakeholder Input (2015) Executive Order (E.O.) 13690, Establishing a Federal Flood Risk Management Standard [FFRMS] and a Process for Further

  17. Using Measurement and Verification to Manage Risk in Federal Energy- and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Water-Saving Projects | Department of Energy Using Measurement and Verification to Manage Risk in Federal Energy- and Water-Saving Projects Using Measurement and Verification to Manage Risk in Federal Energy- and Water-Saving Projects "Risk," in the context of measurement and verification (M&V), refers to the uncertainty that expected savings will be realized. Assumption of risk implies acceptance of the potential monetary consequences. Energy service companies (ESCOs) and

  18. The Integrated Waste Tracking Systems (IWTS) - A Comprehensive Waste Management Tool

    SciTech Connect (OSTI)

    Robert S. Anderson

    2005-09-01

    The US Department of Energy (DOE) Idaho National Laboratory (INL) site located near Idaho Falls, ID USA, has developed a comprehensive waste management and tracking tool that integrates multiple operational activities with characterization data from waste declaration through final waste disposition. The Integrated Waste Tracking System (IWTS) provides information necessary to help facility personnel properly manage their waste and demonstrate a wide range of legal and regulatory compliance. As a client?server database system, the IWTS is a proven tracking, characterization, compliance, and reporting tool that meets the needs of both operations and management while providing a high level of flexibility. This paper describes some of the history involved with the development and current use of IWTS as a comprehensive waste management tool as well as a discussion of IWTS deployments performed by the INL for outside clients. Waste management spans a wide range of activities including: work group interactions, regulatory compliance management, reporting, procedure management, and similar activities. The IWTS documents these activities and performs tasks in a computer-automated environment. Waste characterization data, container characterization data, shipments, waste processing, disposals, reporting, and limit compliance checks are just a few of the items that IWTS documents and performs to help waste management personnel perform their jobs. Throughout most hazardous and radioactive waste generating, storage and disposal sites, waste management is performed by many different groups of people in many facilities. Several organizations administer their areas of waste management using their own procedures and documentation independent of other organizations. Files are kept, some of which are treated as quality records, others not as stringent. Quality records maintain a history of: changes performed after approval, the reason for the change(s), and a record of whom and when the changes were made. As regulations and permits change, and as the proliferation of personal computers flourish, procedures and data files begin to be stored in electronic databases. With many different organizations, contractors, and unique procedures, several dozen databases are used to track and maintain aspects of waste management. As one can see, the logistics of collecting and certifying data from all organizations to provide comprehensive information would not only take weeks to perform, but usually presents a variety of answers that require an immediate unified resolution. A lot of personnel time is spent scrubbing the data in order to determine the correct information. The issue of disparate data is a concern in itself, and is coupled with the costs associated with maintaining several separate databases. In order to gain waste management efficiencies across an entire facility or site, several waste management databases located among several organizations would need to be consolidated. The IWTS is a system to do just that, namely store and track containerized waste information for an entire site. The IWTS has proven itself at the INL since 1995 as an efficient, successful, time saving management tool to help meet the needs of both operations and management for hazardous and radiological containerized waste. Other sites have also benefited from IWTS as it has been deployed at West Valley Nuclear Services Company DOE site as well as Ontario Power Ge

  19. E.O. 13690 (2015): Establishing a Federal Flood Risk Management...

    Broader source: Energy.gov (indexed) [DOE]

    On January 30, 2015, President Obama signed an Executive Order (E.O.) 13690, Establishing a Federal Flood Risk Management Standard and a Process for Further Soliciting and...

  20. Tools for Designing Thermal Management of Batteries in Electric Drive Vehicles (Presentation)

    SciTech Connect (OSTI)

    Pesaran, A.; Keyser, M.; Kim, G. H.; Santhanagopalan, S.; Smith, K.

    2013-02-01

    Temperature has a significant impact on life, performance, and safety of lithium-ion battery technology, which is expected to be the energy storage of choice for electric drive vehicles (xEVs). High temperatures degrade Li-ion cells faster while low temperatures reduce power and energy capabilities that could have cost, reliability, range, or drivability implications. Thermal management of battery packs in xEVs is essential to keep the cells in the desired temperature range and also reduce cell-to-cell temperature variations, both of which impact life and performance. The value that the battery thermal management system provides in reducing battery life and improving performance outweighs its additional cost and complexity. Tools that are essential for thermal management of batteries are infrared thermal imaging, isothermal calorimetry, thermal conductivity meter and computer-aided thermal analysis design software. This presentation provides details of these tools that NREL has used and we believe are needed to design right-sized battery thermal management systems.

  1. Risk Level Based Management System: a control banding model for occupational health and safety risk management in a highly regulated environment

    SciTech Connect (OSTI)

    Zalk, D; Kamerzell, R; Paik, S; Kapp, J; Harrington, D; Swuste, P

    2009-05-27

    The Risk Level Based Management System (RLBMS) is an occupational risk management (ORM) model that focuses occupational safety, hygeiene, and health (OSHH) resources on the highest risk procedures at work. This article demonstrates the model's simplicity through an implementation within a heavily regulated research institution. The model utilizes control banding strategies with a stratification of four risk levels (RLs) for many commonly performed maintenance and support activities, characterizing risk consistently for comparable tasks. RLBMS creates an auditable tracking of activities, maximizes OSHH professional field time, and standardizes documentation and control commensurate to a given task's RL. Validation of RLs and their exposure control effectiveness is collected in a traditional quantitative collection regime for regulatory auditing. However, qualitative risk assessment methods are also used within this validation process. Participatory approaches are used throughout the RLBMS process. Workers are involved in all phases of building, maintaining, and improving this model. This work participation also improves the implementation of established controls.

  2. Information technology and decision support tools for stakeholder-driven river basin salinity management

    SciTech Connect (OSTI)

    Quinn, N.W.T; Cozad, D.B.; Lee, G.

    2010-01-01

    Innovative strategies for effective basin-scale salinity management have been developed in the Hunter River Basin of Australia and more recently in the San Joaquin River Basin of California. In both instances web-based stakeholder information dissemination has been a key to achieving a high level of stakeholder involvement and the formulation of effective decision support salinity management tools. A common element to implementation of salinity management strategies in both river basins has been the concept of river assimilative capacity for controlling export salt loading and the potential for trading of the right to discharge salt load to the river - the Hunter River in Australia and the San Joaquin River in California. Both rivers provide basin drainage and the means of exporting salt to the ocean. The paper compares and contrasts the use of monitoring, modeling and information dissemination in the two basins to achieve environmental compliance and sustain irrigated agriculture in an equitable and socially and politically acceptable manner.

  3. Peaking of world oil production: Impacts, mitigation, & risk management

    SciTech Connect (OSTI)

    Hirsch, R.L.; Bezdek, Roger; Wendling, Robert

    2005-02-01

    The peaking of world oil production presents the U.S. and the world with an unprecedented risk management problem. As peaking is approached, liquid fuel prices and price volatility will increase dramatically, and, without timely mitigation, the economic, social, and political costs will be unprecedented. Viable mitigation options exist on both the supply and demand sides, but to have substantial impact, they must be initiated more than a decade in advance of peaking.... The purpose of this analysis was to identify the critical issues surrounding the occurrence and mitigation of world oil production peaking. We simplified many of the complexities in an effort to provide a transparent analysis. Nevertheless, our study is neither simple nor brief. We recognize that when oil prices escalate dramatically, there will be demand and economic impacts that will alter our simplified assumptions. Consideration of those feedbacks will be a daunting task but one that should be undertaken. Our aim in this study is to-- • Summarize the difficulties of oil production forecasting; • Identify the fundamentals that show why world oil production peaking is such a unique challenge; • Show why mitigation will take a decade or more of intense effort; • Examine the potential economic effects of oil peaking; • Describe what might be accomplished under three example mitigation scenarios. • Stimulate serious discussion of the problem, suggest more definitive studies, and engender interest in timely action to mitigate its impacts.

  4. Applying value engineering and modern assessment tools in managing NEPA: Improving effectiveness of the NEPA scoping and planning process

    SciTech Connect (OSTI)

    ECCLESTON, C.H.

    1998-09-03

    While the National Environmental Policy Act (NEPA) implementing regulations focus on describing ''What'' must be done, they provide surprisingly little direction on ''how'' such requirements are to be implemented. Specific implementation of these requirements has largely been left to the discretion of individual agencies. More than a quarter of a century after NEPA's enactment, few rigorous tools, techniques, or methodologies have been developed or widely adopted for implementing the regulatory requirements. In preparing an Environmental Impact Statement, agencies are required to conduct a public scoping process to determine the range of actions, alternatives, and impacts that will be investigated. Determining the proper scope of analysis is an element essential in the successful planning and implementation of future agency actions. Lack of rigorous tools and methodologies can lead to project delays, cost escalation, and increased risk that the scoping process may not adequately capture the scope of decisions that eventually might need to be considered. Recently, selected Value Engineering (VE) techniques were successfully used in managing a prescoping effort. A new strategy is advanced for conducting a pre-scoping/scoping effort that combines NEPA with VE. Consisting of five distinct phases, this approach has potentially wide-spread implications in the way NEPA, and scoping in particular, is practiced.

  5. "Insurance as a Risk Management Instrument for Energy Infrastructure

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Security and Resilience" Report (March 2013) | Department of Energy "Insurance as a Risk Management Instrument for Energy Infrastructure Security and Resilience" Report (March 2013) "Insurance as a Risk Management Instrument for Energy Infrastructure Security and Resilience" Report (March 2013) The Office of Electricity Delivery and Energy Reliability has released a report that examines the key risks confronting critical energy infrastructure and ways in which the

  6. Insurance as a Risk Management Instrument for Energy Infrastructure Security and Resilience Report Now Available

    Broader source: Energy.gov [DOE]

    The Office of Electricity Delivery and Energy Reliability has released a report that examines the key risks confronting critical energy infrastructure and ways in which the insurance industry can help manage these risks. In most developed countries, insurance is one of the principal risk management instruments for aiding in recovery after a disaster and for encouraging future investments that are more resilient to potential hazards.

  7. Cybersecurity Risk Management Process (RMP) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Related Links Integrating Electricity Subsector Failure Scenarios into a Risk Assessment Methodology (December 2013) Energy Sector Cybersecurity Framework Implementation Guidance ...

  8. Notice of Publication of Electricity Subsector Cybersecurity Risk Management Process: Federal Register Notice Volume 77, No. 100- May 23, 2012

    Broader source: Energy.gov [DOE]

    This serves as public notification of the publication, by the Department of Energy (DOE) of the Electricity Subsector Cybersecurity Risk Management Process guideline. The guideline describes a risk...

  9. Preliminary characterization of risks in the nuclear waste management system based on information in the literature

    SciTech Connect (OSTI)

    Daling, P.M.; Rhoads, R.E.; Van Luick, A.E.; Fecht, B.A.; Nilson, S.A.; Sevigny, N.L.; Armstrong, G.R.; Hill, D.H.; Rowe, M.; Stern, E.

    1992-01-01

    This document presents preliminary information on the radiological and nonradiological risks in the nuclear waste management system. The objective of the study was to (1) review the literature containing information on risks in the nuclear waste management system and (2) use this information to develop preliminary estimates of the potential magnitude of these risks. Information was collected on a broad range of risk categories to assist the US Department of Energy (DOE) in communicating information about the risks in the waste management systems. The study examined all of the portions of the nuclear waste management system currently expected to be developed by the DOE. The scope of this document includes the potential repository, the integral MRS facility, and the transportation system that supports the potential repository and the MRS facility. Relevant literature was reviewed for several potential repository sites and geologic media. A wide range of ``risk categories`` are addressed in this report: (1) public and occupational risks from accidents that could release radiological materials, (2) public and occupational radiation exposure resulting from routine operations, (3) public and occupational risks from accidents involving hazards other than radioactive materials, and (4) public and occupational risks from exposure to nonradioactive hazardous materials during routine operations. The report is intended to provide a broad spectrum of risk-related information about the waste management system. This information is intended to be helpful for planning future studies.

  10. PARALLELS OF RADIATION- AND FINANCIAL-RISK MANAGEMENT ON PUBLIC ACCEPTANCE

    SciTech Connect (OSTI)

    Hogue, M.

    2010-01-04

    The financial collapse of 2007 provides an opportunity for a cross-discipline comparison of risk assessments. Flaws in financial risk assessments bear part of the blame for the financial collapse. There may be a potential for similar flaws to be made in radiological risk assessments. Risk assessments in finance and health physics are discussed in the context of a broader view of the risk management environment. Flawed risk assessments can adversely influence public acceptance of radiological technologies, so the importance of quality is magnified.

  11. An examination of the role of risk assessment in superfund program management, implementation, and evaluation

    SciTech Connect (OSTI)

    Bala, S.

    1995-12-01

    Human health risk assessment is playing an increasing role in the characterization of the nature and extent of human health threats posed by Superfund hazardous waste sites, and the prioritization of these sites for remediation activities. Risk assessment also plays a central role in initiatives to measure and evaluate the program`s progress in remediating these sites, and in efforts to communicate that progress to a diverse audience. This paper examines the current role of risk assessment in Superfund`s program management, implementation, and evaluation activities, and advocates the need for a comprehensive plan to enhance and systematically apply risk assessment information across all of these activities. Specifically, this paper examines the role of risk assessment at three levels: (1) the current role of risk information in Superfund`s program management activities; (2) the current role of risk information in the implementation of site cleanup; (3) profile of Superfund`s approach to measuring, evaluating, and communicating site remediation progress via Environmental Indicators (EIs). Building on this three-level examination, this paper calls for the development of a comprehensive plan for the enhanced and systematic application of risk assessment information in Superfund`s program management, implementation, and evaluation activities. This paper also draws upon the current literature on risk assessment and measurement, risk-based planning and decision-making, and risk communication.

  12. Stored CO2 and Methane Leakage Risk Assessment and Monitoring Tool Development: CO2 Capture Project Phase 2 (CCP2)

    SciTech Connect (OSTI)

    Dan Kieki

    2008-09-30

    The primary project goal is to develop and test tools for optimization of ECBM recovery and geologic storage of CO{sub 2} in coalbeds, in addition to tools for monitoring CO{sub 2} sequestration in coalbeds to support risk assessment. Three critical topics identified are (1) the integrity of coal bed methane geologic and engineered systems, (2) the optimization of the coal bed storage process, and (3) reliable monitoring and verification systems appropriate to the special conditions of CO{sub 2} storage and flow in coals.

  13. Independent Verification and Validation Of SAPHIRE 8 Risk Management Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2009-11-01

    This report provides an evaluation of the risk management. Risk management is intended to ensure a methodology for conducting risk management planning, identification, analysis, responses, and monitoring and control activities associated with the SAPHIRE project work, and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  14. PROJECT MANAGEMENT RISK COMMITTEE (PMRC) STANDARD OPERATING PROCEDURE

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Any deviation to this procedure must be approved by the PMRC Chair. Secretariat Functions ... advising the PMRC Chair and the Chief Executive for Project Management (CE) on all ...

  15. Moving Forward with the Electric Sector Cybersecurity Risk Management Maturity Initiative

    Broader source: Energy.gov [DOE]

    Since the January 5, 2012 launch of the “Electric Sector Cybersecurity Risk Management Maturity” program, a White House initiative led by the Department of Energy in partnership with the Department...

  16. New Draft of Cybersecurity Risk Management Process (RMP) Guideline Now Available for Public Comment (March 2012)

    Broader source: Energy.gov [DOE]

    The Department of Energy, in collaboration with the National Institute of Standards and Technology and the North American Electric Reliability Corporation, has released the second draft of the Electricity Subsector Cybersecurity Risk Management Process (RMP) Guideline for public comment.

  17. Scientific basis for risk assessment and management of uranium mill tailings

    SciTech Connect (OSTI)

    Not Available

    1986-01-01

    A National Research Council study panel, convened by the Board on Radioactive Waste Management, has examined the scientific basis for risk assessment and management of uranium mill tailings and issued this final report containing a number of recommendations. Chapter 1 provides a brief introduction to the problem. Chapter 2 examines the processes of uranium extraction and the mechanisms by which radionuclides and toxic chemicals contained in the ore can enter the environment. Chapter 3 is devoted to a review of the evidence on health risks associated with radon and its decay products. Chapter 4 provides a consideration of conventional and possible new technical alternatives for tailings management. Chapter 5 explores a number of issues of comparative risk, provides a brief history of uranium mill tailings regulation, and concludes with a discussion of choices that must be made in mill tailing risk management. 211 refs., 30 figs., 27 tabs.

  18. Topographical Risk Assessment

    Energy Science and Technology Software Center (OSTI)

    2002-09-24

    TRA was developed as a computer tool for the DOE Office of River Protection (ORP) that will provides the capability to visualize and rapidly understand information about the risks associated with the River protection Project (RPP). Previously, technical and programmatic risk management within ORP had relied heavily on risk lists and other techniques that presented risk information but did not place it in perspective of the overall project. This made it difficult for ORP seniormore » management to understand the risk information presented, prioritize their activities, and provide direction to ORP staff and contractors about how to manage specific risk events. The TRA visualization tool, provides the appropriate context and perspective that allows senior management to effectively manage risks. Basically, the TRA overlays information about risks associated with specific activities and their magnitudes on top of the project baseline schedule. this provides senior management with information about the magnitudes of specific risk events as well as their timing, and allows them to focus their attention and resources on the risks that merit attention and possible further action. The TRA tool can also be used to display other types of information associated with scheduled activities, such as cost to date, technical performance, schedule performance, etc. Additionally, the base of the 3-dimensional representation can be changed to other types of graphics, such as maps, process flow diagrams, etc., which allows the display of other types of informatio, such as hazards, health and safety risks, and system availability.« less

  19. Using Measurement and Verification to Manage Risk in Federal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    "Risk," in the context of measurement and verification (M&V), refers to the uncertainty ... and holding certain parameters fixed in the M&V plan can match up responsibilities. ...

  20. Total quality management (TQM) and the future of the environmental industry: Integration of quality tools and techniques among competing interests

    SciTech Connect (OSTI)

    Bicknell, B.A.; Bicknell, K.D. )

    1993-01-01

    One of the most difficult problems facing industry, regulators, consultants and attorneys involved in the environmental arena is the lack of a functional method of prioritization of the seemingly unreconcilable interests of the varying entities involved in waste reduction, elimination and cleanup. This paper and presentation will address this problem by presenting methodology for problem solving that can be adopted by the competing interests to form a unified systems analysis that has enjoyed widespread use and success in both commercial business and industry, and other regulated government industries such as defense, aerospace and communication. The authors will employ specific examples of case studies with focus on hazardous waste reduction and how the quality tools and techniques commonly referred to as Total Quality Management (such as Quality Function Deployment, Experimental Design, Statistical Process Control and Functional Analysis) are and can be utilized in the process. The authors will illustrate the application of TQM techniques to areas such as process integration (e.g. implementation of the NEPA decision-making), as well as functional implementation in risk assessment, cost analysis and concurrent engineering (in the case of waste minimization technology development).

  1. Derivatives and Risk Management in the Petroleum, Natural Gas, and Electricity Industries

    Reports and Publications (EIA)

    2002-01-01

    In February 2002 the Secretary of Energy directed the Energy Information Administration (EIA) to prepare a report on the nature and use of derivative contracts in the petroleum, natural gas, and electricity industries. Derivatives are contracts ('financial instruments') that are used to manage risk, especially price risk.

  2. Advanced Risk Management (FQN 301), SRS | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This is a Level 3 core course for certification in the Project Management Career ... credit. Course Format: 3.5 days Instructor-led classroom delivery Equivalent Courses: None

  3. Risk management considerations for cost-effective environmental decisionmaking

    SciTech Connect (OSTI)

    Gonzalez, M.A.

    1995-09-14

    Scientific publications and media reports continually remind us about the environmental hazards that surround us. We are appraised of the environmental legacies left by chemical industries, the defense complex, and even our local dry cleaning establishments. Governmental regulations have dictated that industry provide detailed listings of their input materials, wastes, and emissions to the public and perform risk assessments to demonstrate compliance with standards. These regulations were designed to make industry more accountable and to give the public information that would allow them to understand risks and either work for change or accept their living conditions. This process would appear to be rational, fair, and acceptable to both industry and the public. However, our inability to reach agreement on questions such as ``How Clean is Clean?`` or ``Is It Safe?`` after more than ten years of scientific and public discussions, coupled with the frequency of environmental demonstrations throughout the world, serves as evidence that ``acceptable risk`` has not yet been defined.

  4. Federal Energy Management Program Report Template | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications Testing and Validation of Vehicle to Grid Communication Standards Risk Management Tool Attributes: Taking It from Brown to Green: Renewable Energy on ...

  5. Report to the Environmental Management Advisory Board

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Evaluation of the United States Department of Energy Environmental Management Strategic Planning Communication Tool Submitted by the Risk Communications Subcommittee September ...

  6. DOE - Office of Legacy Management -- McKinney Tool and Manufacturing...

    Office of Legacy Management (LM)

    McKinney Tool and Manufacturing Co - OH 17 FUSRAP Considered Sites Site: MCKINNEY TOOL & MANUFACTURING CO. ( OH.17 ) Eliminated from further consideration under FUSRAP Designated...

  7. Corporate planning for compliance with EPA`s proposed risk management program rule

    SciTech Connect (OSTI)

    Mannan, M.; Keeney, R.C.

    1995-12-31

    On October 20, 1993, the US Environmental Protection Agency (EPA) published in the Federal Register the proposed rule entitled Risk Management Programs for Chemical Accidental Release Prevention (40 CFR 68). Subsequently, on January 31, 1994, EPA published in the Federal Register the finalized list of 77 regulated toxic substances and 63 regulated flammable substances that are to be covered under the rule along with the associated threshold quantities for each substance. This list of substances will dictate which stationary sources will have to comply with the requirements of the proposed risk management program rule. The risk management program rule will most likely be finalized sometime after mid-1995. Covered facilities will then have a total of three years to achieve complete compliance with the requirements of the rule. This paper presents an approach for corporations with multiple sites to develop action plans for implementation of the risk management program rule. The process starts with a determination of which facilities are potentially covered, development of a matrix of requirements that each facility must comply with, and finally, common strategies that may be used in achieving compliance. Thus, a multi-facility corporation can develop a baseline compliance guideline document that individual plants can use in developing and implementing their risk management programs.

  8. Waste management project's alternatives: A risk-based multi-criteria assessment (RBMCA) approach

    SciTech Connect (OSTI)

    Karmperis, Athanasios C.; Sotirchos, Anastasios; Aravossis, Konstantinos; Tatsiopoulos, Ilias P.

    2012-01-15

    Highlights: Black-Right-Pointing-Pointer We examine the evaluation of a waste management project's alternatives. Black-Right-Pointing-Pointer We present a novel risk-based multi-criteria assessment (RBMCA) approach. Black-Right-Pointing-Pointer In the RBMCA the evaluation criteria are based on the quantitative risk analysis of the project's alternatives. Black-Right-Pointing-Pointer Correlation between the criteria weight values and the decision makers' risk preferences is examined. Black-Right-Pointing-Pointer Preference to the multi-criteria against the one-criterion evaluation process is discussed. - Abstract: This paper examines the evaluation of a waste management project's alternatives through a quantitative risk analysis. Cost benefit analysis is a widely used method, in which the investments are mainly assessed through the calculation of their evaluation indicators, namely benefit/cost (B/C) ratios, as well as the quantification of their financial, technical, environmental and social risks. Herein, a novel approach in the form of risk-based multi-criteria assessment (RBMCA) is introduced, which can be used by decision makers, in order to select the optimum alternative of a waste management project. Specifically, decision makers use multiple criteria, which are based on the cumulative probability distribution functions of the alternatives' B/C ratios. The RBMCA system is used for the evaluation of a waste incineration project's alternatives, where the correlation between the criteria weight values and the decision makers' risk preferences is analyzed and useful conclusions are discussed.

  9. PylotDB - A Database Management, Graphing, and Analysis Tool Written in Python

    SciTech Connect (OSTI)

    2012-01-04

    PylotDB, written completely in Python, provides a user interface (UI) with which to interact with, analyze, graph data from, and manage open source databases such as MySQL. The UI mitigates the user having to know in-depth knowledge of the database application programming interface (API). PylotDB allows the user to generate various kinds of plots from user-selected data; generate statistical information on text as well as numerical fields; backup and restore databases; compare database tables across different databases as well as across different servers; extract information from any field to create new fields; generate, edit, and delete databases, tables, and fields; generate or read into a table CSV data; and similar operations. Since much of the database information is brought under control of the Python computer language, PylotDB is not intended for huge databases for which MySQL and Oracle, for example, are better suited. PylotDB is better suited for smaller databases that might be typically needed in a small research group situation. PylotDB can also be used as a learning tool for database applications in general.

  10. PylotDB - A Database Management, Graphing, and Analysis Tool Written in Python

    Energy Science and Technology Software Center (OSTI)

    2012-01-04

    PylotDB, written completely in Python, provides a user interface (UI) with which to interact with, analyze, graph data from, and manage open source databases such as MySQL. The UI mitigates the user having to know in-depth knowledge of the database application programming interface (API). PylotDB allows the user to generate various kinds of plots from user-selected data; generate statistical information on text as well as numerical fields; backup and restore databases; compare database tables acrossmore » different databases as well as across different servers; extract information from any field to create new fields; generate, edit, and delete databases, tables, and fields; generate or read into a table CSV data; and similar operations. Since much of the database information is brought under control of the Python computer language, PylotDB is not intended for huge databases for which MySQL and Oracle, for example, are better suited. PylotDB is better suited for smaller databases that might be typically needed in a small research group situation. PylotDB can also be used as a learning tool for database applications in general.« less

  11. Applications of risk management to waste combustion in boilers and industrial furnaces

    SciTech Connect (OSTI)

    Chrostowski, P.C.; Foster, S.A.; Kimball, H.J.

    1996-12-31

    Human health and ecological risk assessments have become routine for waste combustion in boilers and industrial furnaces (BIFs) as a result of USEPA`s Combustion Strategy, questions raised by citizens about the health effects of incineration, and the desire for the regulated community to have a level playing field regarding emissions regulations. The USEPA, National Academy of Sciences, various trade organizations, and individual researchers have published widely regarding methods for facility-specific risk assessments. Often these risk assessments are highly complex, site-specific documents that use advanced techniques such as Monte Carlo simulation. However, the risks that are calculated in these risk assessments are usually only used to compare to criteria for health effects and, thereby, develop permit conditions that are protective of health and the environment. Thus, the risk assessment is only used to derive a simple set of numbers and most of the information derived in the complex risk computations is lost. The object of this paper is to demonstrate how to derive more information from risk assessments that can be used in making management decisions. This paper will discuss the theory of risk management and present applications to combustion of waste in BIFs. For example, a permit applicant needed to make a decision among alternative air pollution control (APC) equipment sequences including scrubbers, fabric filters, and electrostatic precipitators. Limited life cycle analysis was used to determine the amount of direct and total waste produced by each of the alternatives. Monte Carlo risk assessment was used to determine the health risks associated with each of the alternatives and reliability analysis was employed to minimize both waste production and health risk.

  12. RAVEN as a tool for dynamic probabilistic risk assessment: Software overview

    SciTech Connect (OSTI)

    Alfonsi, A.; Rabiti, C.; Mandelli, D.; Cogliati, J. J.; Kinoshita, R. A.

    2013-07-01

    RAVEN is a software tool under development at the Idaho National Laboratory (INL) that acts as the control logic driver and post-processing tool for the newly developed Thermal-Hydraulic code RELAP-7. The scope of this paper is to show the software structure of RAVEN and its utilization in connection with RELAP-7. A short overview of the mathematical framework behind the code is presented along with its main capabilities such as on-line controlling/ monitoring and Monte-Carlo sampling. A demo of a Station Black Out PRA analysis of a simplified Pressurized Water Reactor (PWR) model is shown in order to demonstrate the Monte-Carlo and clustering capabilities. (authors)

  13. RAVEN AS A TOOL FOR DYNAMIC PROBABILISTIC RISK ASSESSMENT: SOFTWARE OVERVIEW

    SciTech Connect (OSTI)

    Alfonsi Andrea; Mandelli Diego; Rabiti Cristian; Joshua Cogliati; Robert Kinoshita

    2013-05-01

    RAVEN is a software tool under development at the Idaho National Laboratory (INL) that acts as the control logic driver and post-processing tool for the newly developed Thermo-Hydraylic code RELAP- 7. The scope of this paper is to show the software structure of RAVEN and its utilization in connection with RELAP-7. A short overview of the mathematical framework behind the code is presented along with its main capabilities such as on-line controlling/monitoring and Monte-Carlo sampling. A demo of a Station Black Out PRA analysis of a simplified Pressurized Water Reactor (PWR) model is shown in order to demonstrate the Monte-Carlo and clustering capabilities.

  14. DOE - Office of Legacy Management -- C-B Tool Products Co - IL...

    Office of Legacy Management (LM)

    C-B Tool Products Co - IL 31 FUSRAP Considered Sites Site: C-B Tool Products Co. (IL.31 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name:...

  15. TH-C-18A-08: A Management Tool for CT Dose Monitoring, Analysis, and Protocol Review

    SciTech Connect (OSTI)

    Wang, J; Chan, F; Newman, B; Larson, D; Leung, A; Fleischmann, D; Molvin, L; Marsh, D; Zorich, C; Phillips, L

    2014-06-15

    Purpose: To develop a customizable tool for enterprise-wide managing of CT protocols and analyzing radiation dose information of CT exams for a variety of quality control applications Methods: All clinical CT protocols implemented on the 11 CT scanners at our institution were extracted in digital format. The original protocols had been preset by our CT management team. A commercial CT dose tracking software (DoseWatch,GE healthcare,WI) was used to collect exam information (exam date, patient age etc.), scanning parameters, and radiation doses for all CT exams. We developed a Matlab-based program (MathWorks,MA) with graphic user interface which allows to analyze the scanning protocols with the actual dose estimates, and compare the data to national (ACR,AAPM) and internal reference values for CT quality control. Results: The CT protocol review portion of our tool allows the user to look up the scanning and image reconstruction parameters of any protocol on any of the installed CT systems among about 120 protocols per scanner. In the dose analysis tool, dose information of all CT exams (from 05/2013 to 02/2014) was stratified on a protocol level, and within a protocol down to series level, i.e. each individual exposure event. This allows numerical and graphical review of dose information of any combination of scanner models, protocols and series. The key functions of the tool include: statistics of CTDI, DLP and SSDE, dose monitoring using user-set CTDI/DLP/SSDE thresholds, look-up of any CT exam dose data, and CT protocol review. Conclusion: our inhouse CT management tool provides radiologists, technologists and administration a first-hand near real-time enterprise-wide knowledge on CT dose levels of different exam types. Medical physicists use this tool to manage CT protocols, compare and optimize dose levels across different scanner models. It provides technologists feedback on CT scanning operation, and knowledge on important dose baselines and thresholds.

  16. The fairness hypothesis and managing the risks of societal technology choices

    SciTech Connect (OSTI)

    Cantor, R.; Rayner, S.

    1987-01-01

    Much of the literature on risk perception and management published over the last few years has asked how society should resolve the question, ''How safe is safe enough.'' This paper argues that, from a societal risk-management perspective, we should be addressing a different range of questions that views societal risk as a whole rather than as the sum of individual hazards. Resolving the question, ''How safe is safe enough.'' is less important in making societal technology choices than ''How fair is safe enough.'' A recent empirical pilot study is reported which explored the fairness hypothesis in the context of nuclear power. The results indicate that the process of technology choice should recognize explicitly the preferred principles different parties hold with respect to obtaining consent from those affected by the risks, distributing the liabilities, and justifying trust in the relevant institutions. The paper closes with a discussion of future prospects for the fairness approach to areas such as noxious facility siting.

  17. A Risk Management Approach to the "Insider Threat"

    SciTech Connect (OSTI)

    Bishop, Matt; Engle, Sophie J.; Frincke, Deborah A.; Gates, Carrie; Greitzer, Frank L.; Peisert, Sean; Whalen, Sean

    2010-09-01

    Abstract Recent surveys indicate that the financial impact and operating losses due to insider intrusions are increasing. But these studies often disagree on what constitutes an insider; indeed, many define it only implicitly. In theory, appropriate selection of, and enforcement of, properly specified security policies should prevent legitimate users from abusing their access to computer systems, information, and other resources. However, even if policies could be expressed precisely, the natural mapping between the natural language expression of a security policy, and the expression of that policy in a form that can be implemented on a computer system or network, creates gaps in enforcement. This paper defines insider precisely, in terms of these gaps, and explores an access-based model for analyzing threats that include those usually termed insider threats. This model enables an organization to order its resources based on the business value for that resource and of the information it contains. By identifying those users with access to high-value resources, we obtain an ordered list of users who can cause the greatest amount of damage. Concurrently with this, we examine psychological indicators in order to determine which users are at the greatest risk of acting inappropriately.We conclude by examining how to merge this model with one of forensic logging and auditing.

  18. Proliferation and Terrorism Risk Assessment

    Broader source: Energy.gov [DOE]

    The objective of the PTRA program is to develop new tools and approaches for understanding, limiting, and managing the risks of proliferation and physical security for fuel cycle options. NE, in...

  19. Geographic Information System Tools for Management of US DOE Sites - 13489

    SciTech Connect (OSTI)

    Carpenter, Cliff; Pilz, Elaine; Pawel, Steve

    2013-07-01

    The DOE Office of Legacy Management (LM) uses a variety of GIS tools to support long-term surveillance and maintenance (LTS and M) activities at DOE closure sites. These geo-spatial applications provide access to data both for external public viewing and for internal analysis and decision making. LM uses a custom geo-spatial application called geo-spatial Environmental Mapping System (GEMS) that draws validated information from a database of 4.6 million analytical results and 232,000 water level measurements for 58 LTS and M sites. These data were collected from transferred sites over a period of 40 years. The database is used to capture and store historical environmental information such as analytical chemistry data, groundwater depths and elevations, well logs, well construction data, geo-referenced boundaries, site physical features, and sampling locations from LTS and M sites. Stakeholders, regulators, and project personnel can use this Web-based application and data to display information in several forms, such as a tabular report, a graph, and a geo-spatial display, or the data can be labeled or highlighted in a map view. Institutional controls, with their LTS and M requirements and documentation, have recently been incorporated into a prototype GEMS Web page for the Weldon Spring, Missouri, Site. LM uses multiple internal GIS viewers to help ensure the future protection of human health and the environment. For example, at the Rocky Flats, Colorado, Site, LM uses a GIS application to display real property interests on authoritative maps. Another project is used to facilitate discussions at stakeholder meetings for the Rocky Flats site's Original Landfill. The Uranium Leasing Program uses multiple interactive maps that assist in ongoing monitoring and the oversight of lease-holders' activities. (authors)

  20. Risk management of undesirable substances in feed following updated risk assessments

    SciTech Connect (OSTI)

    Verstraete, Frans

    2013-08-01

    Directive 2002/32/EC of 7 May 2002 of the European Parliament and of the Council on undesirable substances in animal feed is the framework for the EU action on undesirable substances in feed. This framework Directive provides: ?that products intended for animal feed may enter for use in the Union from third countries, be put into circulation and/or used in the Union only if they are sound, genuine and of merchantable quality and therefore when correctly used do not represent any danger to human health, animal health or to the environment or could adversely affect livestock production. ?that in order to protect animal and public health and the environment, maximum levels for specific undesirable substances shall be established where necessary. ?for mandatory consultation of a scientific body (EFSA) for all provisions which may have an effect upon public health or animal health or on the environment. ?that products intended for animal feed containing levels of an undesirable substance that exceed the established maximum level may not be mixed for dilution purposes with the same, or other, products intended for animal feed and may not be used for the production of compound feed. Based on the provisions and principles laid down in this framework Directive, maximum levels for a whole range of undesirable substances have been established at EU level. During the discussions in view of the adoption of Directive 2002/32/EC, the European Commission made the commitment to review all existing provisions on undesirable substances on the basis of updated scientific risk assessments. Following requests of the European Commission, the Panel on Contaminants in the Food Chain (CONTAM) from the European Food Safety Authority (EFSA) has completed a series of 30 risk assessments undertaken over the last 5 years on undesirable substances in animal feed reviewing the possible risks for animal and human health due to the presence of these substances in animal feed. EU legislation on undesirable substances has undergone recently several changes to take account of these most recent scientific opinions. Furthermore EFSA has assessed the risks for public and animal health following the unavoidable carry-over of coccidiostats into non target feed. Maximum levels for the unavoidable carry-over have been established for the non-target feed and the food of animal origin from non-target animal species.

  1. Intent, Capability and Opportunity: A Holistic Approach to Addressing Proliferation as a Risk Management Issue

    SciTech Connect (OSTI)

    Amanda Rynes; Trond Bjornard

    2011-07-01

    Currently, proliferation risk assessment models are designed to evaluate only a portion of the overall risk, focusing exclusively on either technological or social factors to determine the extent of a threat. Many of these models are intended to act as a means of predicting proliferation potential rather than assessing the system as a whole, ignoring the ability to enhance mitigating factors and manage, rather just establish the presence of, the threat. While the information garnered through these forms of analysis is necessary, it remains incomplete. By incorporating political, social, economic and technical capabilities as well as human factors such as intent into a single, multi-faceted risk management model, proliferation risk can be evaluated more effectively. Framing this information around how to improve and expand the Regime already in place and establishing where there are gaps in the system allows for a more complete approach to risk management, mitigation and resource allocation. The research conducted here seeks to combine all three elements (intent, capability and opportunity) in a comprehensive evaluation which incorporates an assessment of state-level variables, possible proliferation pathways and technical capability. Each portion of the analysis is carried out independently then combined to illustrate the full scope of a State's nuclear infrastructure while showing areas of weakness in the institutional framework.

  2. Hanford Site Environmental Safety and Health Fiscal Year 2001 Budget-Risk management summary

    SciTech Connect (OSTI)

    REEP, I.E.

    1999-05-12

    The Hanford Site Environment, Safety and Health (ES&H) Budget-Risk Management Summary report is prepared to support the annual request to sites in the U.S. Department of Energy (DOE) Complex by DOE, Headquarters. The request requires sites to provide supplementary crosscutting information related to ES&H activities and the ES&H resources that support these activities. The report includes the following: (1) A summary status of fiscal year (FY) 1999 ES&H performance and ES&H execution commitments; (2)Status and plans of Hanford Site Office of Environmental Management (EM) cleanup activities; (3) Safety and health (S&H) risk management issues and compliance vulnerabilities of FY 2001 Target Case and Below Target Case funding of EM cleanup activities; (4) S&H resource planning and crosscutting information for FY 1999 to 2001; and (5) Description of indirect-funded S&H activities.

  3. Summary of Training Workshop on the Use of NASA tools for Coastal Resource Management in the Gulf of Mexico

    SciTech Connect (OSTI)

    Judd, Chaeli; Judd, Kathleen S.; Gulbransen, Thomas C.; Thom, Ronald M.

    2009-03-01

    A two-day training workshop was held in Xalapa, Mexico from March 10-11 2009 with the goal of training end users from the southern Gulf of Mexico states of Campeche and Veracruz in the use of tools to support coastal resource management decision-making. The workshop was held at the computer laboratory of the Institute de Ecologia, A.C. (INECOL). This report summarizes the results of that workshop and is a deliverable to our NASA client.

  4. The role of risk management in the design of diagnostics for fusion reactors

    SciTech Connect (OSTI)

    Ingesson, L. C.; Collaboration: F4E Diagnostic Project Team

    2014-08-21

    A project-oriented approach is beneficial for the selection and design of viable diagnostics for fusion reactors because of the associated complex physical and organizational environment. The project-oriented approach includes rigorous risk management. The nature and impact of risks related to technical, organizational and commercial aspects in relation to the development of ITER diagnostics under EU responsibility are analyzed. The majority of risks are related to organizational aspects and technical feasibility issues. The experience with ITER is extrapolated to DEMO and beyond. It should not be taken for granted that technical solutions will be found, while a risk analysis of various diagnostic techniques with quantitative assessments undertaken early in the design of DEMO would be beneficial.

  5. DOE - Office of Legacy Management -- Simmons Machine and Tool Inc - NY 35

    Office of Legacy Management (LM)

    Simmons Machine and Tool Inc - NY 35 FUSRAP Considered Sites Site: SIMMONS MACHINE AND TOOL, INC (NY.35) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: 1000 North Broadway , Albany , New York NY.35-1 Evaluation Year: 1987 NY.35-2 Site Operations: Tested equipment and machined uranium to test the equipment (one time event). NY.35-1 NY.35-2 Site Disposition: Eliminated - Potential for contamination considered remote due to limited scope

  6. Tools for Closure Project and Contract Management: Development of the Rocky Flats Integrated Closure Project Baseline

    SciTech Connect (OSTI)

    Gelles, C. M.; Sheppard, F. R.

    2002-02-26

    This paper details the development of the Rocky Flats Integrated Closure Project Baseline - an innovative project management effort undertaken to ensure proactive management of the Rocky Flats Closure Contract in support of the Department's goal for achieving the safe closure of the Rocky Flats Environmental Technology Site (RFETS) in December 2006. The accelerated closure of RFETS is one of the most prominent projects within the Department of Energy (DOE) Environmental Management program. As the first major former weapons plant to be remediated and closed, it is a first-of-kind effort requiring the resolution of multiple complex technical and institutional challenges. Most significantly, the closure of RFETS is dependent upon the shipment of all special nuclear material and wastes to other DOE sites. The Department is actively working to strengthen project management across programs, and there is increasing external interest in this progress. The development of the Rocky Flats Integrated Closure Project Baseline represents a groundbreaking and cooperative effort to formalize the management of such a complex project across multiple sites and organizations. It is original in both scope and process, however it provides a useful precedent for the other ongoing project management efforts within the Environmental Management program.

  7. Notice of Public Comment on Electricity Sector Cybersecurity Risk Management Process Guideline: Federal Register Notice Volume 76, No. 180- Sep. 16, 2011

    Broader source: Energy.gov [DOE]

    The Department of Energy invited public comment on DOE’s intent to publish the Electricity Sector Cybersecurity Risk Management Process Guideline. The guideline describes a risk management process...

  8. Re-engineering the Federal planning process: A total Federal planning strategy, integrating NEPA with modern management tools

    SciTech Connect (OSTI)

    Eccleston, C.H.

    1997-09-05

    The National Environmental Policy Act (NEPA) of 1969 was established by Congress more than a quarter of a century ago, yet there is a surprising lack of specific tools, techniques, and methodologies for effectively implementing these regulatory requirements. Lack of professionally accepted techniques is a principal factor responsible for many inefficiencies. Often, decision makers do not fully appreciate or capitalize on the true potential which NEPA provides as a platform for planning future actions. New approaches and modem management tools must be adopted to fully achieve NEPA`s mandate. A new strategy, referred to as Total Federal Planning, is proposed for unifying large-scale federal planning efforts under a single, systematic, structured, and holistic process. Under this approach, the NEPA planning process provides a unifying framework for integrating all early environmental and nonenvironmental decision-making factors into a single comprehensive planning process. To promote effectiveness and efficiency, modem tools and principles from the disciplines of Value Engineering, Systems Engineering, and Total Quality Management are incorporated. Properly integrated and implemented, these planning tools provide the rigorous, structured, and disciplined framework essential in achieving effective planning. Ultimately, the goal of a Total Federal Planning strategy is to construct a unified and interdisciplinary framework that substantially improves decision-making, while reducing the time, cost, redundancy, and effort necessary to comply with environmental and other planning requirements. At a time when Congress is striving to re-engineer the governmental framework, apparatus, and process, a Total Federal Planning philosophy offers a systematic approach for uniting the disjointed and often convoluted planning process currently used by most federal agencies. Potentially this approach has widespread implications in the way federal planning is approached.

  9. Communities of Practice: A Tool for Creating Institutional Change in Support of the Mission of the Federal Energy Management Program

    Broader source: Energy.gov [DOE]

    Report describes how the Federal Energy Management Program could use communities of practice as tools to stimulate organizational, social, and cultural change to support energy efficiency, renewable energy, and water conservation efforts. Done right, communities of practice have great potential to leverage existing resources. The paper describes the behavior and organizational principles that underlie communities of practices, provides examples of different types of communities of practice, for example, the American Council for an Energy-Efficient Economy Summer Study, EVALTALK, and the Home Energy Pros website. The paper also provides guidance about how to establish a community of practice and a checklist for doing so.

  10. Pilot study risk assessment for selected problems at the Fernald Environmental Management Project (FEMP)

    SciTech Connect (OSTI)

    Hamilton, L.D.; Meinhold, A.F.; Baxter, S.L.; Holtzman, S.; Morris, S.C.; Pardi, R.; Rowe, M.D.; Sun, C.; Anspaugh, L.; Layton, D.

    1993-03-01

    Two important environmental problems at the USDOE Fernald Environmental Management Project (FEMP) facility in Fernald, Ohio were studied in this human health risk assessment. The problems studied were radon emissions from the K-65 waste silos, and offsite contamination of ground water with uranium. Waste from the processing of pitchblende ore is stored in the K-65 silos at the FEMP. Radium-226 in the waste decays to radon gas which escapes to the outside atmosphere. The concern is for an increase in lung cancer risk for nearby residents associated with radon exposure. Monitoring data and a gaussian plume transport model were used to develop a source term and predict exposure and risk to fenceline residents, residents within 1 and 5 miles of the silos, and residents of Hamilton and Cincinnati, Ohio. Two release scenarios were studied: the routine release of radon from the silos and an accidental loss of one silo dome integrity. Exposure parameters and risk factors were described as distributions. Risks associated with natural background radon concentrations were also estimated.

  11. Software and Tools

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Software and Tools Software and Tools The table below shows the software installed on Euclid that is managed by modules. Package Category Version Module Install Date Date Made...

  12. Baseline Risk Assessment Supporting Closure at Waste Management Area C at the Hanford Site Washington

    SciTech Connect (OSTI)

    Singleton, Kristin M.

    2015-01-07

    The Office of River Protection under the U.S. Department of Energy is pursuing closure of the Single-Shell Tank (SST) Waste Management Area (WMA) C under the requirements of the Hanford Federal Facility Agreement and Consent Order (HFFACO). A baseline risk assessment (BRA) of current conditions is based on available characterization data and information collected at WMA C. The baseline risk assessment is being developed as a part of a Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI)/Corrective Measures Study (CMS) at WMA C that is mandatory under Comprehensive Environmental Response, Compensation, and Liability Act and RCRA corrective action. The RFI/CMS is needed to identify and evaluate the hazardous chemical and radiological contamination in the vadose zone from past releases of waste from WMA C. WMA C will be under Federal ownership and control for the foreseeable future, and managed as an industrial area with restricted access and various institutional controls. The exposure scenarios evaluated under these conditions include Model Toxics Control Act (MTCA) Method C, industrial worker, maintenance and surveillance worker, construction worker, and trespasser scenarios. The BRA evaluates several unrestricted land use scenarios (residential all-pathway, MTCA Method B, and Tribal) to provide additional information for risk management. Analytical results from 13 shallow zone (0 to 15 ft. below ground surface) sampling locations were collected to evaluate human health impacts at WMA C. In addition, soil analytical data were screened against background concentrations and ecological soil screening levels to determine if soil concentrations have the potential to adversely affect ecological receptors. Analytical data from 12 groundwater monitoring wells were evaluated between 2004 and 2013. A screening of groundwater monitoring data against background concentrations and Federal maximum concentration levels was used to determine vadose zone contamination impacts on groundwater. Waste Management Area C is the first of the Hanford tank farms to begin the closure planning process. The current baseline risk assessment will provide valuable information for making corrective actions and closure decisions for WMA C, and will also support the planning for future tank farm soil investigation and baseline risk assessments.

  13. EO 13690 (2015): Establishing a Federal Flood Risk Management Standard and a Process for Further Soliciting and Considering Stakeholder Input

    Broader source: Energy.gov [DOE]

    Executive Order (E.O.) 13690, Establishing a Federal Flood Risk Management Standard [FFRMS] and a Process for Further Soliciting and Considering Stakeholder Input (2015) amends E.O. 11988,...

  14. Report to the Environmental Management Advisory Board

    Energy Savers [EERE]

    Report to the Environmental Management Advisory Board Evaluation of the United States Department of Energy Environmental Management Strategic Planning Communication Tool Submitted by the Risk Communications Subcommittee Date - June 14, 2013 Background: In December 2012, during an Environmental Management Advisory Board (EMAB) meeting, representatives from the United States Department of Energy (DOE) recommended that a subgroup of the Risk Subcommittee review a strategic planning tool under

  15. Nuclear Safety Risk Management in Refueling Outage of Qinshan Nuclear Power Plant

    SciTech Connect (OSTI)

    Meijing Wu; Guozhang Shen [Qinshan Nuclear power company (China)

    2006-07-01

    The NPP is used to planning maintenance, in-service inspection, surveillance test, fuel handling and design modification in the refueling outage; the operator response capability will be reduced plus some of the plant systems out of service or loss of power at this time. Based on 8 times refueling outage experiences of the Qinshan NPP, this article provide some good practice and lesson learned for the nuclear safety risk management focus at four safety function areas of Residual Heat Removal Capability, Inventory Control, Power availability and Reactivity control. (authors)

  16. Groundwater contamination. Volume 2: Management, containment, risk assessment and legal issues

    SciTech Connect (OSTI)

    Rail, C.D.

    2000-07-01

    This book explains in a comprehensive way the sources for groundwater contamination, the regulations governing it, and the technologies for abating it. Volume 2 discusses aquifer management, including technologies to control and stabilize multiple influxes into the water table. This volume outlines strategies for stormwater control and groundwater restoration and presents numerous case histories of site analysis and remediation based on DOE and state documents. Among the many new features of this edition are a full discussion of risk assessment, the preparation of groundwater protection plans, and references linking the text to over 2,300 water-related Web sites.

  17. Managing the global environmental risks in Russia: The missing links and external influences

    SciTech Connect (OSTI)

    Sokolov, V.

    1996-12-31

    Based on analysis of management history of three global environmental issues in Russia--climate change, ozone depletion and acid rains--the author suggests a few explanations of failure to build-up the nationwide strategy to manage global risks. Among them are specific factors related to the science-policy relationship on global changes processes and impacts. Particular attention is given to such internal factors as: the monopolization of these issues by the single state agency Hydromet until the late 1980s; the interest of the Soviet military in global atmospheric issues; the absence of any major input from the public or the media; and the manner in which the discussion of these issues was nested within the Soviet government`s broader foreign policy agenda.

  18. Single Audit Act Initiatives by the Office of Risk Management, Office of the Chief Financial Officer Activities

    Broader source: Energy.gov [DOE]

    This Flash forwards a memorandum from the Chief Financial Officer on new initiatives relating to the Single Audit Act and Office of Management and Budget Circular A-1 33. The Office of Risk Management will provide services to assist DOE'S acquisition and financial assistance personnel in the review and use of audits performed under the Act and Circular.

  19. The AmeriFlux Data Activity and Data System: An Evolving Collection of Data Management Techniques, Tools, Products and Services

    SciTech Connect (OSTI)

    Boden, Thomas A; Krassovski, Misha B; Yang, Bai

    2013-01-01

    The Carbon Dioxide Information Analysis Center (CDIAC) at Oak Ridge National Laboratory (ORNL), USA has provided scientific data management support for the U.S. Department of Energy and international climate change science since 1982. Over this period, climate change science has expanded from research focusing on basic understanding of geochemical cycles, particularly the carbon cycle, to integrated research addressing climate change impacts, vulnerability, adaptation, and mitigation. Interests in climate change data and information worldwide have grown remarkably and, as a result, so have demands and expectations for CDIAC s data systems. To meet the growing demands, CDIAC s strategy has been to design flexible data systems using proven technologies blended with new, evolving technologies and standards. CDIAC development teams are multidisciplinary and include computer science and information technology expertise, but also scientific expertise necessary to address data quality and documentation issues and to identify data products and system capabilities needed by climate change scientists. CDIAC has learned there is rarely a single commercial tool or product readily available to satisfy long-term scientific data system requirements (i.e., one size does not fit all and the breadth and diversity of environmental data are often too complex for easy use with commercial products) and typically deploys a variety of tools and data products in an effort to provide credible data freely to users worldwide. Like many scientific data management applications, CDIAC s data systems are highly customized to satisfy specific scientific usage requirements (e.g., developing data products specific for model use) but are also designed to be flexible and interoperable to take advantage of new software engineering techniques, standards (e.g., metadata standards) and tools and to support future Earth system data efforts (e.g., ocean acidification). CDIAC has provided data management support for numerous long-term measurement projects crucial to climate change science. One current example is the AmeriFlux measurement network. AmeriFlux provides continuous measurements from forests, grasslands, wetlands, and croplands in North, Central, and South America and offers important insight about carbon cycling in terrestrial ecosystems. We share our approaches in satisfying the challenges of delivering AmeriFlux data worldwide to benefit others with similar challenges handling climate change data, further heighten awareness and use of an outstanding ecological data resource, and highlight expanded software engineering applications being used for climate change measurement data.

  20. One size fits all? An assessment tool for solid waste management at local and national levels

    SciTech Connect (OSTI)

    Broitman, Dani; Ayalon, Ofira; Kan, Iddo

    2012-10-15

    Highlights: Black-Right-Pointing-Pointer Waste management schemes are generally implemented at national or regional level. Black-Right-Pointing-Pointer Local conditions characteristics and constraints are often neglected. Black-Right-Pointing-Pointer We developed an economic model able to compare multi-level waste management options. Black-Right-Pointing-Pointer A detailed test case with real economic data and a best-fit scenario is described. Black-Right-Pointing-Pointer Most efficient schemes combine clear National directives with local level flexibility. - Abstract: As environmental awareness rises, integrated solid waste management (WM) schemes are increasingly being implemented all over the world. The different WM schemes usually address issues such as landfilling restrictions (mainly due to methane emissions and competing land use), packaging directives and compulsory recycling goals. These schemes are, in general, designed at a national or regional level, whereas local conditions and constraints are sometimes neglected. When national WM top-down policies, in addition to setting goals, also dictate the methods by which they are to be achieved, local authorities lose their freedom to optimize their operational WM schemes according to their specific characteristics. There are a myriad of implementation options at the local level, and by carrying out a bottom-up approach the overall national WM system will be optimal on economic and environmental scales. This paper presents a model for optimizing waste strategies at a local level and evaluates this effect at a national level. This is achieved by using a waste assessment model which enables us to compare both the economic viability of several WM options at the local (single municipal authority) level, and aggregated results for regional or national levels. A test case based on various WM approaches in Israel (several implementations of mixed and separated waste) shows that local characteristics significantly influence WM costs, and therefore the optimal scheme is one under which each local authority is able to implement its best-fitting mechanism, given that national guidelines are kept. The main result is that strict national/regional WM policies may be less efficient, unless some type of local flexibility is implemented. Our model is designed both for top-down and bottom-up assessment, and can be easily adapted for a wide range of WM option comparisons at different levels.

  1. Evaluation of injection well risk management potential in the Williston Basin

    SciTech Connect (OSTI)

    1989-09-01

    The UIC regulations promulgated by the EPA under the Safe Drinking Water Act (SDWA) provide the EPA, or an EPA approved state agency, with authority to regulate subsurface injection of fluids to protect USDWs. Oil and gas producing industry interests are concerned primarily with Class 2 wells whose uses as defined by UIC regulations are: disposal of fluids brought to the surface and liquids generated in connection with oil and gas production (SWD); injection of fluids for enhanced oil recovery (EOR); and storage of liquid hydrocarbons. The Williston Basin was chosen for the pilot study of the feasibility of using the risk approach in managing Class 2 injection operations for the following reasons: it is one of the nine geologic basins which was classified as having a significant potential for external casing corrosion, which permitted an evaluation of the effectiveness of the injection well corrosion control measures used by industry; there are 731 active, 22 shut in and 203 temporarily abandoned SWD and water injection wells in the basin; and the basin covers three states. The broad objective of the Williston Basin study is to define requirements and to investigate the feasibility of incorporating risk management into administration of the UIC program. The study does not address the reporting aspects of UIC regulatory and compliance activities but the data base does contain essentially all the information required to develop the reports needed to monitor those activities. 16 refs., 10 figs., 11 tabs.

  2. Centralized Cryptographic Key Management and Critical Risk Assessment - CRADA Final Report For CRADA Number NFE-11-03562

    SciTech Connect (OSTI)

    Abercrombie, R. K.; Peters, Scott

    2014-05-28

    The Department of Energy Office of Electricity Delivery and Energy Reliability (DOE-OE) Cyber Security for Energy Delivery Systems (CSEDS) industry led program (DE-FOA-0000359) entitled "Innovation for Increasing Cyber Security for Energy Delivery Systems (12CSEDS)," awarded a contract to Sypris Electronics LLC to develop a Cryptographic Key Management System for the smart grid (Scalable Key Management Solutions for Critical Infrastructure Protection). Oak Ridge National Laboratory (ORNL) and Sypris Electronics, LLC as a result of that award entered into a CRADA (NFE-11-03562) between ORNL and Sypris Electronics, LLC. ORNL provided its Cyber Security Econometrics System (CSES) as a tool to be modified and used as a metric to address risks and vulnerabilities in the management of cryptographic keys within the Advanced Metering Infrastructure (AMI) domain of the electric sector. ORNL concentrated our analysis on the AMI domain of which the National Electric Sector Cyber security Organization Resource (NESCOR) Working Group 1 (WG1) has documented 29 failure scenarios. The computational infrastructure of this metric involves system stakeholders, security requirements, system components and security threats. To compute this metric, we estimated the stakes that each stakeholder associates with each security requirement, as well as stochastic matrices that represent the probability of a threat to cause a component failure and the probability of a component failure to cause a security requirement violation. We applied this model to estimate the security of the AMI, by leveraging the recently established National Institute of Standards and Technology Interagency Report (NISTIR) 7628 guidelines for smart grid security and the International Electrotechnical Commission (IEC) 63351, Part 9 to identify the life cycle for cryptographic key management, resulting in a vector that assigned to each stakeholder an estimate of their average loss in terms of dollars per day of system operation. To further address probabilities of threats, information security analysis can be performed using game theory implemented in dynamic Agent Based Game Theoretic (ABGT) simulations. Such simulations can be verified with the results from game theory analysis and further used to explore larger scale, real world scenarios involving multiple attackers, defenders, and information assets. The strategy for the game was developed by analyzing five electric sector representative failure scenarios contained in the AMI functional domain from NESCOR WG1. From these five selected scenarios, we characterized them into three specific threat categories affecting confidentiality, integrity and availability (CIA). The analysis using our ABGT simulation demonstrated how to model the AMI functional domain using a set of rationalized game theoretic rules decomposed from the failure scenarios in terms of how those scenarios might impact the AMI network with respect to CIA.

  3. Accidental release prevention requirement: Risk management programs under Clean Air Act section 112(r)(7)

    SciTech Connect (OSTI)

    Hahn, J. [Integrated Waste Services Association, Fairfield, NJ (United States)

    1997-12-01

    The Occupational Safety and Health Administration promulgates and enforces regulations that govern the health and safety of workers. OSHA rules often are considered to govern what happens {open_quotes}inside the fence line,{close_quotes} or within the physical boundaries of the facility. In some ways, the U.S. Environmental Protection Agency takes over where OSHA leaves off. The U.S. EPA is responsible for environmental programs {open_quotes}outside the fence line.{close_quotes} The concept is as simple as drawing a line, or is it? Anyone developing and implementing compliance programs, whether for OSHA or EPA, will tell you nothing is that simple. EPA`s recent promulgation of rules pertaining to risk management programs is a case in point. A new EPA rule is intended to compliment OSHA requirements under the Process Safety Management (PSM) rule. Under the OSHA rule, plant operators developed programs that ensure safe measures are in use when handling certain chemicals. During the past three years, waste-to-energy facilities faced difficult decisions when complying with the PSM requirements. Earlier this year, the US EPA promulgated its 112(r)(7) rule that is intended to `complement` OSHA`s PSM requirements. This is not always the case. Unfortunately, these new Clean Air Act requirements do not always complement, but may instead confuse plant operators. For example, EPA`s 112(r) rule may force plant operators to change, once again, their decisions on the use of selected chemicals. The US EPA estimates that approximately 66,000 facilities, including the 114 waste-to-energy facilities nationwide, may be affected by the list and risk management planning rules. The facilities include chemical and many other manufacturers, cold storage facilities with ammonia refrigeration systems, public water treatment systems, wholesalers and distributors of these chemicals, propane retailers, utilities, and federal facilities.

  4. Relative Hazard and Risk Measure Calculation Methodology

    SciTech Connect (OSTI)

    Stenner, Robert D.; Strenge, Dennis L.; Elder, Matthew S.

    2004-03-20

    The relative hazard (RH) and risk measure (RM) methodology and computer code is a health risk-based tool designed to allow managers and environmental decision makers the opportunity to readily consider human health risks (i.e., public and worker risks) in their screening-level analysis of alternative cleanup strategies. Environmental management decisions involve consideration of costs, schedules, regulatory requirements, health hazards, and risks. The RH-RM tool is a risk-based environmental management decision tool that allows managers the ability to predict and track health hazards and risks over time as they change in relation to mitigation and cleanup actions. Analysis of the hazards and risks associated with planned mitigation and cleanup actions provides a baseline against which alternative strategies can be compared. This new tool allows managers to explore “what if scenarios,” to better understand the impact of alternative mitigation and cleanup actions (i.e., alternatives to the planned actions) on health hazards and risks. This new tool allows managers to screen alternatives on the basis of human health risk and compare the results with cost and other factors pertinent to the decision. Once an alternative or a narrow set of alternatives are selected, it will then be more cost-effective to perform the detailed risk analysis necessary for programmatic and regulatory acceptance of the selected alternative. The RH-RM code has been integrated into the PNNL developed Framework for Risk Analysis In Multimedia Environmental Systems (FRAMES) to allow the input and output data of the RH-RM code to be readily shared with the more comprehensive risk analysis models, such as the PNNL developed Multimedia Environmental Pollutant Assessment System (MEPAS) model.

  5. New Guidelines for Implementing Executive Order 11988, "Floodplain Management," And Executive Order 13690, "Establishing a Federal Flood Risk Management Standard..."

    Broader source: Energy.gov [DOE]

    The Federal Emergency Management Agency (FEMA) announced that the interagency Water Resources Council  issued "Guidelines for Implementing Executive Order 11988, Floodplain Management, and...

  6. Forest Irrigation Of Tritiated Water: A Proven Tritiated Water Management Tool

    SciTech Connect (OSTI)

    Vangelas, Karen; Blount, Gerald; Kmetz, Thomas; Prater, Phil

    2012-11-08

    Tritium releases from the Old Radioactive Waste Burial Ground (ORWBG) at the SRS in South Carolina has impacted groundwater and surface water. Tritiated groundwater plumes discharge into Fourmile Branch which is a small tributary of the Savannah River, a regional water resource. Taking advantage of the groundwater flow paths and the local topography a water collection and irrigation system was constructed and has been used at the SRS for over a decade to reduce these tritiated water releases to Fourmile Branch. The tritiated water is transferred to the atmosphere by evaporation from the pond surface, and after irrigation, wetted surface evaporation and evapotranspiration through the forest vegetation. Over the last decade SRS has irrigated over 120,000,000 gallons of tritiated water, which diverted over 6000 curies away from Fourmile Branch and the Savannah River. The system has been effective in reducing the flux of tritiated groundwater by approximately 70%. Mass balance studies of tritium in the forest soils before operations and over the last decade indicate that approximately 90% of the tritiated water that is irrigated is transferred to the atmosphere. Dose studies indicate that exposure to site workers and offsite maximally exposed individual is very low, approximately 6 mrem/year and 0.004 mrem/year, respectively. To consistently meet the flux reduction goal of tritium into Fourmile Branch optimization activities are proposed. These efforts will increase irrigation capacity and area. An additional 17 acres are proposed for an expansion of the area to be irrigated and a planting of approximately 40 acres of pine forest plantations is underway to expand irrigation capacity. Co-mingled with the tritiated groundwater are low concentrations of chlorinated volatile organic compounds (cVOCs), and 1,4-dioxane. Research studies and SRS field data indicate the forest irrigation system may have an added benefit of reducing the mass of these co-contaminants via degradation. This semi-passive system makes use of natural processes of hydrology and evapotranspiration to manage tritium-contaminated water by reducing its entrance into site streams and the Savannah River, as well as treating low levels of co-mingled VOCs. SRS expects to operate the system until the tritium decays to levels that represent a minimal impact to Fourmile Branch and the Savannah River, and meets the stakeholder expectations.

  7. Regulatory Tools

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Regulatory Tools Home CRA - 2004 Final Recertification Decision CRA Comments & Responses CCA - 1996 CRA CARDs & TSDs CCA CARDs & TSDs Regulatory Tools Title 40 CFR Part 191 Environmental Radiation Protection Standards for Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes. Title 40 CFR Part 194 Criteria for the Certification and Re-Certification of the Waste Isolation Pilot Plant's Compliance With the 40 CFR Part 191 Disposal Regulations.

  8. Risk management study for the retired Hanford Site facilities: Qualitative risk evaluation for the retired Hanford Site facilities. Volume 3

    SciTech Connect (OSTI)

    Coles, G.A.; Shultz, M.V.; Taylor, W.E.

    1993-09-01

    This document provides a risk evaluation of the 100 and 200 Area retired, surplus facilities on the Hanford Site. Also included are the related data that were compiled by the risk evaluation team during investigations performed on the facilities. Results are the product of a major effort performed in fiscal year 1993 to produce qualitative information that characterizes certain risks associated with these facilities. The retired facilities investigated for this evaluation are located in the 100 and 200 Areas of the 1,450-km{sup 2} (570-mi{sup 2}) Hanford Site. The Hanford Site is a semiarid tract of land in southeastern Washington State. The nearest population center is Richland, Washington, (population 32,000) 30-km (20 mi) southeast of the 200 Area. During walkdown investigations of these facilities, data on real and potential hazards that threatened human health or safety or created potential environmental release issues were identified by the risk evaluation team. Using these findings, the team categorized the identified hazards by facility and evaluated the risk associated with each hazard. The factors contributing to each risk, and the consequence and likelihood of harm associated with each hazard also are included in this evaluation.

  9. November 10, 2015 Webinar- Congressionally Mandated Review of the Use Of Risk-Informed Management in the DOE EM Program

    Broader source: Energy.gov [DOE]

    P&RA CoP Webinar - November 10, 2015 Webinar - Congressionally Mandated Review of the Use Of Risk-Informed Management in the DOE EM Program. (Dr. Michael Greenberg, Rutgers University; Dr. Steven Krahn, Vanderbilt University; and Mr. Timothy Fields, MDB, Inc.).

  10. Status of Environmental Management Initiatives to Accelerate the Reduction of Environmental Risks and Challenges Posed by the Legacy of the Cold War

    SciTech Connect (OSTI)

    2009-01-01

    Fifty years of nuclear weapons production and energy research in the United States during the Cold War generated large amounts of radioactive wastes, spent nuclear fuel (SNF), excess plutonium and uranium, thousands of contaminated facilities, and contaminated soil and groundwater. During most of that half century, the Nation did not have the environmental regulatory structure or nuclear waste cleanup technologies that exist today. The result was a legacy of nuclear waste that was stored and disposed of in ways now considered unacceptable. Cleaning up and ultimately disposing of these wastes is the responsibility of the U.S. Department of Energy (DOE). In 1989, DOE established the Office of Environmental Management (EM) to solve the large scale and technically challenging risks posed by the world's largest nuclear cleanup. This required EM to build a new nuclear cleanup infrastructure, assemble and train a technically specialized workforce, and develop the technologies and tools required to safely decontaminate, disassemble, stabilize, disposition, and remediate unique radiation hazards. The sites where nuclear activities produced legacy waste and contamination include the original Manhattan Project sites--Los Alamos, New Mexico; Hanford, Washington; and Oak Ridge, Tennessee--as well as major Cold War sites, such as Savannah River Site, South Carolina; the Idaho National Laboratory, Idaho; Rocky Flats Plant, Colorado; and Fernald, Ohio. Today EM has responsibility for nuclear cleanup activities at 21 sites covering more than two million acres in 13 states, and employs more than 30,000 Federal and contractor employees, including scientists, engineers and hazardous waste technicians. This cleanup poses unique, technically complex problems, which must be solved under the most hazardous of conditions, and which will require billions of dollars a year for several more decades. The EM program focus during its first 10 years was on managing the most urgent risks and maintaining safety at each site while negotiating state and Federal environmental compliance agreements. The program also concentrated on characterizing waste and nuclear materials and assessing the magnitude and extent of environmental contamination. By the late 1990s, EM had made significant progress in identifying and characterizing the extent of contamination and cleanup required and began transitioning from primarily a characterization and stabilization program to an active cleanup and closure program. During that time, EM formulated multi-year cleanup and closure plans, which contributed to cleanup progress; however, reducing the overall environmental risk associated with the cleanup program remained a challenge. In response, the Secretary of Energy directed a review of the EM program be undertaken. The resulting 'Top-to Bottom Review' re-directed the program focus from managing risks to accelerating the reduction of these risks.

  11. Risk perception on management of nuclear high-level and transuranic waste storage

    SciTech Connect (OSTI)

    Dees, L.A.

    1994-08-15

    The Department of Energy`s program for disposing of nuclear High-Level Waste (HLW) and transuranic (TRU) waste has been impeded by overwhelming political opposition fueled by public perceptions of actual risk. Analysis of these perceptions shows them to be deeply rooted in images of fear and dread that have been present since the discovery of radioactivity. The development and use of nuclear weapons linked these images to reality and the mishandling of radioactive waste from the nations military weapons facilities has contributed toward creating a state of distrust that cannot be erased quickly or easily. In addition, the analysis indicates that even the highly educated technical community is not well informed on the latest technology involved with nuclear HLW and TRU waste disposal. It is not surprising then, that the general public feels uncomfortable with DOE`s management plans for with nuclear HLW and TRU waste disposal. Postponing the permanent geologic repository and use of Monitored Retrievable Storage (MRS) would provide the time necessary for difficult social and political issues to be resolved. It would also allow time for the public to become better educated if DOE chooses to become proactive.

  12. Software and Tools

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Software and Tools Software and Tools The table below shows the software installed on Euclid that is managed by modules. Package Category Version Module Install Date Date Made Default Last edited: 2016-03-21 13:44:4

  13. Commissioning the neutron production of a Linac: Development of a simple tool for second cancer risk estimation

    SciTech Connect (OSTI)

    Romero-Expsito, M.; Snchez-Nieto, B.; Terrn, J. A.; Lopes, M. C.; Ferreira, B. C.; Grishchuk, D.; Sandn, C.; Moral-Snchez, S.; Melchor, M.; Domingo, C.; and others

    2015-01-15

    Purpose: Knowing the contribution of neutron to collateral effects in treatments is both a complex and a mandatory task. This work aims to present an operative procedure for neutron estimates in any facility using a neutron digital detector. Methods: The authors previous work established a linear relationship between the total second cancer risk due to neutrons (TR{sup n}) and the number of MU of the treatment. Given that the digital detector also presents linearity with MU, its response can be used to determine the TR{sup n} per unit MU, denoted as m, normally associated to a generic Linac model and radiotherapy facility. Thus, from the number of MU of each patient treatment, the associated risk can be estimated. The feasibility of the procedure was tested by applying it in eight facilities; patients were evaluated as well. Results: From the reading of the detector under selected irradiation conditions, m values were obtained for different machines, ranging from 0.25 10{sup ?4}% per MU for an Elekta Axesse at 10 MV to 6.5 10{sup ?4}% per MU for a Varian Clinac at 18 MV. Using these values, TR{sup n} of patients was estimated in each facility and compared to that from the individual evaluation. Differences were within the range of uncertainty of the authors methodology of equivalent dose and risk estimations. Conclusions: The procedure presented here allows an easy estimation of the second cancer risk due to neutrons for any patient, given the number of MU of the treatment. It will enable the consideration of this information when selecting the optimal treatment for a patient by its implementation in the treatment planning system.

  14. Tools | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Information Resources » Tools Tools Below are links to tools that assist users with project planning and analysis. Spectrally Enhanced Lighting Spectrally Enhanced Lighting (SEL) is a cost-effective, low-risk design method for achieving significant energy savings by shifting lamp color from the warmer to the cooler (whiter) end of the color spectrum, more closely matching daylight. Residential Lighting Usage Estimate Tool The Residential Lighting Usage Estimate Tool is a companion to the

  15. The Department of Energy Releases Draft of Cybersecurity Risk Management Process (RMP) Guideline for Public Comment

    Broader source: Energy.gov [DOE]

    Public-Private Sector Collaboration Produces Guidance to Help Electric UtilitiesBetter Understand and Assess Cybersecurity Risk

  16. Lustre Administrative Tool

    Energy Science and Technology Software Center (OSTI)

    2003-12-24

    The Lustre Administrative Tools (LAT) is a set of programs and utilities designed to facilitate management of the Lustre File System by System Administrators.

  17. Reducing Risk for the Next Generation Nuclear Plant

    SciTech Connect (OSTI)

    John M. Beck II; Harold J. Heydt; Emmanuel O. Opare; Kyle B. Oswald

    2010-07-01

    The Next Generation Nuclear Plant (NGNP) Project, managed by the Idaho National Laboratory (INL), is directed by the Energy Policy Act of 2005, to research, develop, design, construct, and operate a prototype forth generation nuclear reactor to meet the needs of the 21st Century. As with all large projects developing and deploying new technologies, the NGNP has numerous risks that need to be identified, tracked, mitigated, and reduced in order for successful project completion. A Risk Management Plan (RMP) was created to outline the process the INL is using to manage the risks and reduction strategies for the NGNP Project. Integral to the RMP is the development and use of a Risk Management System (RMS). The RMS is a tool that supports management and monitoring of the project risks. The RMS does not only contain a risk register, but other functionality that allows decision makers, engineering staff, and technology researchers to review and monitor the risks as the project matures.

  18. Managing the risks of extreme events and disasters to advance climate change adaptation. Special report of the Intergovernmental Panel on Climate Change (IPCC)

    SciTech Connect (OSTI)

    Field, C.B.; Barros, V.; Stocker, T.F.

    2012-07-01

    This Special Report on Managing the Risks of Extreme Events and Disasters to Advance Climate Change Adaptation (SREX) has been jointly coordinated by Working Groups I (WGI) and II (WGII) of the Intergovernmental Panel on Climate Change (IPCC). The report focuses on the relationship between climate change and extreme weather and climate events, the impacts of such events, and the strategies to manage the associated risks. This Special Report, in particular, contributes to frame the challenge of dealing with extreme weather and climate events as an issue in decision making under uncertainty, analyzing response in the context of risk management. The report consists of nine chapters, covering risk management; observed and projected changes in extreme weather and climate events; exposure and vulnerability to as well as losses resulting from such events; adaptation options from the local to the international scale; the role of sustainable development in modulating risks; and insights from specific case studies. (LN)

  19. Assessing Risk and Driving Risk Mitigation for First-of-a-Kind Advanced Reactors

    SciTech Connect (OSTI)

    John W. Collins

    2011-09-01

    Planning and decision making amidst programmatic and technological risks represent significant challenges for projects. This presentation addresses the four step risk-assessment process needed to determine clear path forward to mature needed technology and design, license, and construct advanced nuclear power plants, which have never been built before, including Small Modular Reactors. This four step process has been carefully applied to the Next Generation Nuclear Plant. STEP 1 - Risk Identification Risks are identified, collected, and categorized as technical risks, programmatic risks, and project risks, each of which result in cost and schedule impacts if realized. These include risks arising from the use of technologies not previously demonstrated in a relevant application. These risks include normal and accident scenarios which the SMR could experience including events that cause the disablement of engineered safety features (typically documented in Phenomena Identification Ranking Tables (PIRT) as produced with the Nuclear Regulatory Commission) and design needs which must be addressed to further detail the design. Product - Project Risk Register contained in a database with sorting, presentation, rollup, risk work off functionality similar to the NGNP Risk Management System . STEP 2 - Risk Quantification The risks contained in the risk register are then scored for probability of occurrence and severity of consequence, if realized. Here the scoring methodology is established and the basis for the scoring is well documented. Product - Quantified project risk register with documented basis for scoring. STEP 3 - Risk Handling Strategy Risks are mitigated by applying a systematic approach to maturing the technology through Research and Development, modeling, test, and design. A Technology Readiness Assessment is performed to determine baseline Technology Readiness Levels (TRL). Tasks needed to mature the technology are developed and documented in a roadmap. Product - Risk Handling Strategy. STEP 4 - Residual Risk Work off The risk handling strategy is entered into the Project Risk Allocation Tool (PRAT) to analyze each task for its ability to reduce risk. The result is risk-informed task prioritization. The risk handling strategy is captured in the Risk Management System, a relational database that provides conventional database utility, including data maintenance, archiving, configuration control, and query ability. The tool's Hierarchy Tree allows visualization and analyses of complex relationships between risks, risk mitigation tasks, design needs, and PIRTs. Product - Project Risk Allocation Tool and Risk Management System which depict project plan to reduce risk and current progress in doing so.

  20. New Flood Risk Management Standard Responds to Effects of Climate Change |

    Energy Savers [EERE]

    of Energy Financing Tool Expands Market to Institutional Investors New Financing Tool Expands Market to Institutional Investors Photo of the wheel and helm of a boat. A new financing platform designed to open the market for energy efficiency to institutional investors, known as Warehouse for Energy Efficiency Loans (WHEEL), was launched in April 2014. WHEEL leverages public funds with private capital to provide low-cost, large-scale financing for residential energy efficiency programs. The

  1. Disaster risk management in prospect mining area Blitar district, East Java, using microtremor analysis and ANP (analytical network processing) approach

    SciTech Connect (OSTI)

    Parwatiningtyas, Diyan E-mail: erlinunindra@gmail.com; Ambarsari, Erlin Windia E-mail: erlinunindra@gmail.com; Marlina, Dwi E-mail: erlinunindra@gmail.com; Wiratomo, Yogi E-mail: erlinunindra@gmail.com

    2014-03-24

    Indonesia has a wealth of natural assets is so large to be managed and utilized, either from its own local government and local communities, especially in the mining sector. However, mining activities can change the state of the surface layer of the earth that have a high impact disaster risk. This could threaten the safety and disrupt human life, environmental damage, loss of property, and the psychological impact, sulking to the rule of law no 24 of 2007. That's why we strive to manage and minimize the risk of mine disasters in the region, how to use the method of calculation of Amplification Factor (AF) from the analysis based microtremor sulking Kanai and Nakamura, and decision systems were tested by analysis of ANP. Based on the amplification factor and Analytical Network Processing (ANP) obtained, some points showed instability in the surface layer of a mining area include the site of the TP-7, TP-8, TP-9, TP-10, (Birowo2). If in terms of structure, location indicated unstable due to have a sloping surface layer, resulting in the occurrence of landslides and earthquake risk is high. In the meantime, other areas of the mine site can be said to be a stable area.

  2. Waste management health risk assessment: A case study of a solid waste landfill in South Italy

    SciTech Connect (OSTI)

    Davoli, E.; Fattore, E.; Paiano, V.; Colombo, A.; Palmiotto, M.; Rossi, A.N.; Il Grande, M.; Fanelli, R.

    2010-08-15

    An integrated risk assessment study has been performed in an area within 5 km from a landfill that accepts non hazardous waste. The risk assessment was based on measured emissions and maximum chronic population exposure, for both children and adults, to contaminated air, some foods and soil. The toxic effects assessed were limited to the main known carcinogenic compounds emitted from landfills coming both from landfill gas torch combustion (e.g., dioxins, furans and polycyclic aromatic hydrocarbons, PAHs) and from diffusive emissions (vinyl chloride monomer, VCM). Risk assessment has been performed both for carcinogenic and non-carcinogenic effects. Results indicate that cancer and non-cancer effects risk (hazard index, HI) are largely below the values accepted from the main international agencies (e.g., WHO, US EPA) and national legislation ( and ).

  3. Light Water Reactor Sustainability Program Technical Basis Guide Describing How to Perform Safety Margin Configuration Risk Management

    SciTech Connect (OSTI)

    Curtis Smith; James Knudsen; Bentley Harwood

    2013-08-01

    The INL has carried out a demonstration of the RISMC approach for the purpose of configuration risk management. We have shown how improved accuracy and realism can be achieved by simulating changes in risk as a function of different configurations in order to determine safety margins as the plant is modified. We described the various technical issues that play a role in these configuration-based calculations with the intent that future applications can take advantage of the analysis benefits while avoiding some of the technical pitfalls that are found for these types of calculations. Specific recommendations have been provided on a variety of topics aimed at improving the safety margin analysis and strengthening the technical basis behind the analysis process.

  4. Advance Liquid Metal Reactor Discrete Dynamic Event Tree/Bayesian Network Analysis and Incident Management Guidelines (Risk Management for Sodium Fast Reactors)

    SciTech Connect (OSTI)

    Denman, Matthew R.; Groth, Katrina M.; Cardoni, Jeffrey N.; Wheeler, Timothy A.

    2015-04-01

    Accident management is an important component to maintaining risk at acceptable levels for all complex systems, such as nuclear power plants. With the introduction of self-correcting, or inherently safe, reactor designs the focus has shifted from management by operators to allowing the system's design to manage the accident. Inherently and passively safe designs are laudable, but nonetheless extreme boundary conditions can interfere with the design attributes which facilitate inherent safety, thus resulting in unanticipated and undesirable end states. This report examines an inherently safe and small sodium fast reactor experiencing a beyond design basis seismic event with the intend of exploring two issues : (1) can human intervention either improve or worsen the potential end states and (2) can a Bayesian Network be constructed to infer the state of the reactor to inform (1). ACKNOWLEDGEMENTS The authors would like to acknowledge the U.S. Department of Energy's Office of Nuclear Energy for funding this research through Work Package SR-14SN100303 under the Advanced Reactor Concepts program. The authors also acknowledge the PRA teams at Argonne National Laboratory, Oak Ridge National Laboratory, and Idaho National Laboratory for their continue d contributions to the advanced reactor PRA mission area.

  5. Database and Analytical Tool Development for the Management of Data Derived from US DOE (NETL) Funded Fine Particulate (PM2.5) Research

    SciTech Connect (OSTI)

    Robinson Khosah

    2007-07-31

    Advanced Technology Systems, Inc. (ATS) was contracted by the U. S. Department of Energy's National Energy Technology Laboratory (DOE-NETL) to develop a state-of-the-art, scalable and robust web-accessible database application to manage the extensive data sets resulting from the DOE-NETL-sponsored ambient air monitoring programs in the upper Ohio River valley region. The data management system was designed to include a web-based user interface that will allow easy access to the data by the scientific community, policy- and decision-makers, and other interested stakeholders, while providing detailed information on sampling, analytical and quality control parameters. In addition, the system will provide graphical analytical tools for displaying, analyzing and interpreting the air quality data. The system will also provide multiple report generation capabilities and easy-to-understand visualization formats that can be utilized by the media and public outreach/educational institutions. The project was conducted in two phases. Phase One included the following tasks: (1) data inventory/benchmarking, including the establishment of an external stakeholder group; (2) development of a data management system; (3) population of the database; (4) development of a web-based data retrieval system, and (5) establishment of an internal quality assurance/quality control system on data management. Phase Two involved the development of a platform for on-line data analysis. Phase Two included the following tasks: (1) development of a sponsor and stakeholder/user website with extensive online analytical tools; (2) development of a public website; (3) incorporation of an extensive online help system into each website; and (4) incorporation of a graphical representation (mapping) system into each website. The project is now technically completed.

  6. Database and Analytical Tool Development for the Management of Data Derived from US DOE (NETL) Funded Fine Particulate (PM2.5) Research

    SciTech Connect (OSTI)

    Robinson P. Khosah; Frank T. Alex

    2007-02-11

    Advanced Technology Systems, Inc. (ATS) was contracted by the U. S. Department of Energy's National Energy Technology Laboratory (DOE-NETL) to develop a state-of-the-art, scalable and robust web-accessible database application to manage the extensive data sets resulting from the DOE-NETL-sponsored ambient air monitoring programs in the upper Ohio River valley region. The data management system was designed to include a web-based user interface that will allow easy access to the data by the scientific community, policy- and decision-makers, and other interested stakeholders, while providing detailed information on sampling, analytical and quality control parameters. In addition, the system will provide graphical analytical tools for displaying, analyzing and interpreting the air quality data. The system will also provide multiple report generation capabilities and easy-to-understand visualization formats that can be utilized by the media and public outreach/educational institutions. The project is being conducted in two phases. Phase One includes the following tasks: (1) data inventory/benchmarking, including the establishment of an external stakeholder group; (2) development of a data management system; (3) population of the database; (4) development of a web-based data retrieval system, and (5) establishment of an internal quality assurance/quality control system on data management. Phase Two, which is currently underway, involves the development of a platform for on-line data analysis. Phase Two includes the following tasks: (1) development of a sponsor and stakeholder/user website with extensive online analytical tools; (2) development of a public website; (3) incorporation of an extensive online help system into each website; and (4) incorporation of a graphical representation (mapping) system into each website. The project is now into its forty-eighth month of development activities.

  7. DATABASE AND ANALYTICAL TOOL DEVELOPMENT FOR THE MANAGEMENT OF DATA DERIVED FROM US DOE (NETL) FUNDED FINE PARTICULATE (PM2.5) RESEARCH

    SciTech Connect (OSTI)

    Robinson P. Khosah; Charles G. Crawford

    2003-03-13

    Advanced Technology Systems, Inc. (ATS) was contracted by the U. S. Department of Energy's National Energy Technology Laboratory (DOE-NETL) to develop a state-of-the-art, scalable and robust web-accessible database application to manage the extensive data sets resulting from the DOE-NETL-sponsored ambient air monitoring programs in the upper Ohio River valley region. The data management system was designed to include a web-based user interface that will allow easy access to the data by the scientific community, policy- and decision-makers, and other interested stakeholders, while providing detailed information on sampling, analytical and quality control parameters. In addition, the system will provide graphical analytical tools for displaying, analyzing and interpreting the air quality data. The system will also provide multiple report generation capabilities and easy-to-understand visualization formats that can be utilized by the media and public outreach/educational institutions. The project is being conducted in two phases. Phase 1, which is currently in progress and will take twelve months to complete, will include the following tasks: (1) data inventory/benchmarking, including the establishment of an external stakeholder group; (2) development of a data management system; (3) population of the database; (4) development of a web-based data retrieval system, and (5) establishment of an internal quality assurance/quality control system on data management. In Phase 2, which will be completed in the second year of the project, a platform for on-line data analysis will be developed. Phase 2 will include the following tasks: (1) development of a sponsor and stakeholder/user website with extensive online analytical tools; (2) development of a public website; (3) incorporation of an extensive online help system into each website; and (4) incorporation of a graphical representation (mapping) system into each website. The project is now into its sixth month of Phase 1 development activities.

  8. Draft Waste Management Programmatic Environmental Impact Statement for managing treatment, storage, and disposal of radioactive and hazardous waste. Volume 3, Appendix A: Public response to revised NOI, Appendix B: Environmental restoration, Appendix C, Environmental impact analysis methods, Appendix D, Risk

    SciTech Connect (OSTI)

    1995-08-01

    Volume three contains appendices for the following: Public comments do DOE`s proposed revisions to the scope of the waste management programmatic environmental impact statement; Environmental restoration sensitivity analysis; Environmental impacts analysis methods; and Waste management facility human health risk estimates.

  9. Decision Support Tool for the Management of Debris from Radiological Dispersal Devices and Other Incidents of National Significance

    SciTech Connect (OSTI)

    Lemieux, P.; Thorneloe, S.; Hayes, C.; Rodgers, M.; Christman, R.

    2008-07-01

    Unique challenges exist for the handling, transport, and disposal of debris resulting from homeland security incidents, disasters or other national emergencies. Access to guidance to facilitate decision making to ensure the safe and timely disposal of debris is critical to helping restore a community or region and prevent further contamination or spread of disease. For a radiological dispersal device (RDD), proper characterization of the quantity, properties, and level of contamination of debris can have a significant impact on cleanup costs and timelines. A suite of decision support tools (DSTs) is being developed by the U.S. EPA's Office of Research and Development to assist individuals responsible for making decisions associated with handling, transport, and disposal of such debris. The DSTs are location-specific to help identify specific facilities and contacts for making final disposal decisions. The DSTs provide quick reference to technical information, regulations, and other information to provide decision makers with assistance in guiding disposal decisions that are important for the protection of public health, first responders, and the environment. These tools are being developed in partnership with other U.S. government agencies, EPA program offices, industry, and state and local emergency response programs. (authors)

  10. Managing Carbon Regulatory Risk in Utility Resource Planning: Current Practices in the Western United States

    SciTech Connect (OSTI)

    Barbose, Galen; Wiser, Ryan; Phadke, Amol; Goldman, Charles

    2008-07-11

    Concerns about global climate change have substantially increased the likelihood that future policy will seek to minimize carbon dioxide emissions. As such, even today, electric utilities are making resource planning and investment decisions that consider the possible implications of these future carbon regulations. In this article, we examine the manner in which utilities assess the financial risks associated with future carbon regulations within their long-term resource plans. We base our analysis on a review of the most recent resource plans filed by fifteen electric utilities in the Western United States. Virtually all of these utilities made some effort to quantitatively evaluate the potential cost of future carbon regulations when analyzing alternate supply- and demand-side resource options for meeting customer load. Even without Federal climate regulation in the U.S., the prospect of that regulation is already having an impact on utility decision-making and resource choices. That said, the methods and assumptions used by utilities to analyze carbon regulatory risk, and the impact of that analysis on their choice of a particular resource strategy, vary considerably, revealing a number of opportunities for analytic improvement. Though our review focuses on a subset of U.S. electric utilities, this work holds implications for all electric utilities and energy policymakers who are seeking to minimize the compliance costs associated with future carbon regulations.

  11. Managing Carbon Regulatory Risk in Utility Resource Planning:Current Practices in the Western United States

    SciTech Connect (OSTI)

    Barbose, Galen; Wiser, Ryan; Phadke, Amol; Goldman, Charles

    2008-05-16

    Concerns about global climate change have substantially increased the likelihood that future policy will seek to minimize carbon dioxide emissions. Assuch, even today, electric utilities are making resource planning and investment decisions that consider the possible implications of these future carbon regulations. In this article, we examine the manner in which utilities assess the financial risks associated with future carbon regulations within their long-term resource plans. We base our analysis on a review of the most recent resource plans filed by fifteen electric utilities in the Western United States. Virtually all of these utilities made some effort to quantitatively evaluate the potential cost of future carbon regulations when analyzing alternate supply- and demand-side resource options for meeting customer load. Even without Federal climate regulation in the U.S., the prospect of that regulation is already having an impact on utility decision-making and resource choices. That said, the methods and assumptions used by utilities to analyze carbon regulatory risk, and the impact of that analysis on their choice of a particular resource strategy, vary considerably, revealing a number of opportunities for analytic improvement. Though our review focuses on a subset of U.S. electric utilities, this work holds implications for all electric utilities and energy policymakers who are seeking to minimize the compliance costs associated with future carbon regulations

  12. Risk management considerations for seismic upgrading of an older facility for short-term residue stabilization

    SciTech Connect (OSTI)

    Additon, S.L.; Peregoy, W.L.; Foppe, T.L.

    1999-06-01

    Building 707 and its addition, Building 707A, were selected, after the production mission of Rocky Flats was terminated a few years ago, to stabilize many of the plutonium residues remaining at the site by 2002. The facility had undergone substantial safety improvements to its safety systems and conduct of operations for resumption of plutonium operations in the early 1990s and appeared ideally suited for this new mission to support accelerated Site closure. During development of a new authorization basis, a seismic evaluation was performed. This evaluation addressed an unanalyzed expansion joint and suspect connection details for the precast concrete tilt-up construction and concluded that the seismic capacity of the facility is less than half of that determined by previous analysis. Further, potential seismic interaction was identified between a collapsing Building 707 and the seismically upgraded Building 707A, possibly causing the partial collapse of the latter. Both the operating contractor and the Department of Energy sought a sound technical basis for deciding how to proceed. This paper addresses the risks of the as-is facility and possible benefits of upgrades to support a decision on whether to upgrade the seismic capacity of Building 707, accept the risk of the as-is facility for its short remaining mission, or relocate critical stabilization missions. The paper also addresses the Department of Energy`s policy on natural phenomena.

  13. Improved Radiation Dosimetry/Risk Estimates to Facilitate Environmental Management of Plutonium-Contaminated Sites

    SciTech Connect (OSTI)

    Scott, Bobby R.; Tokarskaya, Zoya B.; Zhuntova, Galina V.; Osovets, Sergey V.; Syrchikov, Victor A., Belyaeva, Zinaida D.

    2007-12-14

    This report summarizes 4 years of research achievements in this Office of Science (BER), U.S. Department of Energy (DOE) project. The research described was conducted by scientists and supporting staff at Lovelace Respiratory Research Institute (LRRI)/Lovelace Biomedical and Environmental Research Institute (LBERI) and the Southern Urals Biophysics Institute (SUBI). All project objectives and goals were achieved. A major focus was on obtaining improved cancer risk estimates for exposure via inhalation to plutonium (Pu) isotopes in the workplace (DOE radiation workers) and environment (public exposures to Pu-contaminated soil). A major finding was that low doses and dose rates of gamma rays can significantly suppress cancer induction by alpha radiation from inhaled Pu isotopes. The suppression relates to stimulation of the body's natural defenses, including immunity against cancer cells and selective apoptosis which removes precancerous and other aberrant cells.

  14. From Risk to Opportunity. How Insurers Can Proactively and Profitably Manage Climate Change

    SciTech Connect (OSTI)

    Mills, E.; Lecomte, E.

    2006-08-15

    Last year's USD 45 billion of insured losses from Hurricane Katrina was only the latest reminder of why investors and consumers are concerned about the impacts of climate change on the insurance industry. Twelve months after the devastating storm hit New Orleans, insurers and their shareholders are still feeling the ripples. Record insured losses, rating downgrades, coverage pullbacks and class-action lawsuits are just a few of the reverberations that have been felt across the industry. Meanwhile, consumers are feeling the combined sting of price shocks and reduced availability. So serious is the issue that 20 leading investors, representing over $800 billion in assets, called on the nation's largest insurance companies to disclose their financial exposure from climate change and steps they are taking to reduce those financial impacts. But, while most of the attention is focused on the growing risks, climate change also creates vast business opportunities to be part of the solution to global warming. Just as the industry has historically asserted its leadership to minimize risks from building fires and earthquakes, insurers have a huge opportunity today to develop creative loss-prevention products and services that will reduce climate-related losses for consumers, governments and insurers, while trimming the emissions causing global warming. This report focuses on the encouraging progress made by insurers to develop these new products and services. It identifies more than 190 concrete examples available, or soon-to-be-available, from dozens of insurance providers in 16 countries. In addition to benefiting insurers' core business and investment activities, these programs afford insurers the opportunity to differentiate their products from their competitors, while also enhancing their reputation with customers who are increasingly looking for all sectors of the industry to come forward with effective responses to the threats caused by climate change. More than half of the products come from U.S. companies, covering such services as green building design, hurricane-resistant construction, carbon emissions trading and renewable energy.

  15. Advanced Simulation Capability for Environmental Management (ASCEM) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Advanced Simulation Capability for Environmental Management (ASCEM) Advanced Simulation Capability for Environmental Management (ASCEM) Advanced Simulation Capability for Environmental Management (ASCEM) ASCEM is being developed to provide a tool and approach to facilitate robust and standardized development of performance and risk assessments for cleanup and closure activities throughout the EM complex. The ASCEM team is composed of scientists from eight National

  16. Rapid Risk Assessment: FY05 Annual Summary Report

    SciTech Connect (OSTI)

    Whelan, Gene; Millard, W. David; Gelston, Gariann M.; Pelton, Mitch A.; Yang, Zhaoqing; Strenge, Dennis L.; Lee, Cheegwan; Sivaraman, Chitra; Simpson, Mary J.; Young, Joan K.; Khangaonkar, Tarang P.; Downing, Timothy R.; Hoopes, Bonnie L.; Hachmeister, Lon E.

    2006-03-06

    The Pacific Northwest National Laboratory (PNNL) is developing decision support tools that will assist in the transition of incident information into Protective Action Recommendations (PARs) that are understandable and can be executed in a real-world, operational environment. During emergencies, responders must rapidly assess risks and decide on the best course of actionall within minutes to hours. PNNL is blending existing modeling and decision support technology to develop new methods for transitioning science-based threat assessment to PARs. The rapid risk assessment tool will be both understandable and applicable to the emergency management community and would be a valuable tool during any water security-related incident. In 2005, PNNL demonstrated the integration of the multi-thematic modeling with emergency management decision support tools to create a Rapid Risk Assessment (RRA) tool that will transition risk to PARs that assist in responding to or mitigating the direct and indirect impacts of the incident(s). The RRA tool does this by aligning multi-thematic modeling capabilities with real-world response zones established by emergency and site operations managers. The RRA tool uses the risk assessment tool to drive prognostic models that use the type of incident, time of impact, severity of impact, and duration of impact to select the most appropriate PAR. Because PARs (and the thresholds by which they are selected) are jointly established by the technologists and the emergency management and operations decision makers, the science-based risk assessment can transition into a recommendation that can be understood and executed by people in the field.

  17. Development Tools

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    More Python Tools Python is an interpreted, general-purpose high-level programming language that is usually accompanied by a variety of useful tools for scientific programming...

  18. Demand Response Analysis Tool

    Energy Science and Technology Software Center (OSTI)

    2012-03-01

    Demand Response Analysis Tool is a software developed at the Lawrence Berkeley National Laboratory. It is initially funded by Southern California Edison. Our goal in developing this tool is to provide an online, useable, with standardized methods, an analysis tool to evaluate demand and demand response performance of commercial and industrial facilities. The tool provides load variability and weather sensitivity analysis capabilities as well as development of various types of baselines. It can be usedmore » by researchers, real estate management firms, utilities, or any individuals who are interested in analyzing their demand and demand response capabilities.« less

  19. Demand Response Analysis Tool

    SciTech Connect (OSTI)

    2012-03-01

    Demand Response Analysis Tool is a software developed at the Lawrence Berkeley National Laboratory. It is initially funded by Southern California Edison. Our goal in developing this tool is to provide an online, useable, with standardized methods, an analysis tool to evaluate demand and demand response performance of commercial and industrial facilities. The tool provides load variability and weather sensitivity analysis capabilities as well as development of various types of baselines. It can be used by researchers, real estate management firms, utilities, or any individuals who are interested in analyzing their demand and demand response capabilities.

  20. Other Workflow Tools

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tools Other Workflow Tools This page serves as a point of reference to point our users to tools being used by other NERSC projects to see if these can meet their needs. This includes other tools in the workflow ecosystem as well as auxiliary services to enable custom workflows. qdo QDO is a toolkit for managing many many small tasks within a larger batch framework. QDO separates the queue of tasks to perform from the batch jobs that actually perform the tasks. Read More » Galaxy Galaxy - Galaxy

  1. Air Sparging Decision Tool

    Energy Science and Technology Software Center (OSTI)

    1996-06-10

    The Air Sparging Decision Tool is a computer decision aid to help environmental managers and field practitioners in evaluating the applicability of air sparging to a wide range of sites and for refining the operation of air sparging systems. The program provides tools for the practitioner to develop the conceptual design for an air sparging system suitable for the identified site. The Tool provides a model of the decision making process, not a detailed designmore » of air sparging systems. The Tool will quickly and cost effectively assist the practitioner in screening for applicability of the technology at a proposed site.« less

  2. Sierra Nevada Tools

    Energy Science and Technology Software Center (OSTI)

    2004-01-01

    SNTools is a general framework for managing, through the use of policies, development tools used to create software. To date, most implementations written under the framework focus on managing revision control, building and testing. The Sierra implementation of the SNTools is used in the development and installation of the SIERRA Framework and its applications, SNTools is used as a method of managing or codifying software quality engineering practices.

  3. Geographic Information Systems- Tools For Geotherm Exploration...

    Open Energy Info (EERE)

    Information Systems- Tools For Geotherm Exploration, Tracers Data Analysis, And Enhanced Data Distribution, Visualization, And Management Abstract Geographic information...

  4. management

    National Nuclear Security Administration (NNSA)

    5%2A en Management and Budget http:www.nnsa.energy.govaboutusouroperationsmanagementandbudget

  5. Deactivation & Decommissioning Knowledge Management Information...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Knowledge Management Information Tool (D&D KM-IT) Deactivation & Decommissioning Knowledge Management Information Tool (D&D KM-IT) Deactivation & Decommissioning Knowledge ...

  6. Bibliographic Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and more from varied resources and databases to organize references, keep notes to stay ahead of the game. Questions? 505-667-5809 Email Bibliographic management tools allow...

  7. management

    National Nuclear Security Administration (NNSA)

    5%2A en Management and Budget http:nnsa.energy.govaboutusouroperationsmanagementandbudget

    P...

  8. Summary Report on Information Technology Integration Activities For project to Enhance NASA Tools for Coastal Managers in the Gulf of Mexico and Support Technology Transfer to Mexico

    SciTech Connect (OSTI)

    Gulbransen, Thomas C.

    2009-04-27

    Deliverable to NASA Stennis Space Center summarizing summarizes accomplishments made by Battelle and its subcontractors to integrate NASA's COAST visualization tool with the Noesis search tool developed under the Gulf of Mexico Regional Collaborative project.

  9. Biosecurity Risk Assessment Methodology (BioRAM) v. 2.0

    Energy Science and Technology Software Center (OSTI)

    2009-06-08

    Sandia National Laboratories International Biological Threat Reduction Dept (SNL/IBTR) has an ongoing mission to enhance biosecurity assessment methodologies, tools, and guise. These will aid labs seeking to implement biosecurity as advocated in the recently released WHO's Biorisk Management: Lab Biosecurity Guidance. BioRAM 2.0 is the software tool developed initially using the SNL LDRD process and designed to complement the "Laboratory Biosecurity Risk Handbook" written by Ren Salerno and Jennifer Gaudioso defining biosecurity risk assessment methodologies.

  10. Percussion tool

    DOE Patents [OSTI]

    Reed, Teddy R.

    2006-11-28

    A percussion tool is described and which includes a housing mounting a tool bit; a reciprocally moveable hammer borne by the housing and which is operable to repeatedly strike the tool bit; and a reciprocally moveable piston enclosed within the hammer and which imparts reciprocal movement to the reciprocally moveable hammer.

  11. Risk Management RM

    Office of Environmental Management (EM)

    ... Standard Review Plan provides guidelines for preparing a Review Plan and a final report. ... Readiness Assessment (TRA)Technology Maturation Plan (TMP) Process Guide EM ...

  12. Project Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Management Project Management Some of the Project Management Division’s many functions involve developing risk management plans, managing project risks, and providing input on prime contractor performance. Some of the Project Management Division's many functions involve developing risk management plans, managing project risks, and providing input on prime contractor performance. Employees in our Project Management Division address projects' planning and execution, as specified in

  13. AMERIND Risk Annual Conference and Trade Fair

    Broader source: Energy.gov [DOE]

    Hosted by the AMERIND Risk, this three-day conference includes risk management training, workers' safety, human resources, and more.

  14. Revised Guidelines for Implementing Executive Order 11988, "Floodplain Management," and Executive Order 13690, "Establishing a Federal Flood Risk Management Standard and a Process for Further Soliciting and Considering Stakeholder Input" (2015)

    Broader source: Energy.gov [DOE]

    The Water Resources Council approved revised implementing guidelines for E.O. 11988 (as amended) (2015) and E.O. 13690 (2015) in October 2015. The revised implementing guidelines explain the use of natural systems, ecosystem processes, and nature-based approaches for identifying alternatives, and provide other technical guidance for implementing E.0. 11988 (as amended) (2015) and the Federal Flood Risk Management Standard (FFRMS).

  15. Global Climate Change: Risk to Bank Loans | Open Energy Information

    Open Energy Info (EERE)

    Risk to Bank Loans Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Global Climate Change: Risk to Bank Loans AgencyCompany Organization: United Nations...

  16. Initial Risk Analysis and Decision Making Framework

    SciTech Connect (OSTI)

    Engel, David W.

    2012-02-01

    Commercialization of new carbon capture simulation initiative (CCSI) technology will include two key elements of risk management, namely, technical risk (will process and plant performance be effective, safe, and reliable) and enterprise risk (can project losses and costs be controlled within the constraints of market demand to maintain profitability and investor confidence). Both of these elements of risk are incorporated into the risk analysis subtask of Task 7. Thus far, this subtask has developed a prototype demonstration tool that quantifies risk based on the expected profitability of expenditures when retrofitting carbon capture technology on a stylized 650 MW pulverized coal electric power generator. The prototype is based on the selection of specific technical and financial factors believed to be important determinants of the expected profitability of carbon capture, subject to uncertainty. The uncertainty surrounding the technical performance and financial variables selected thus far is propagated in a model that calculates the expected profitability of investments in carbon capture and measures risk in terms of variability in expected net returns from these investments. Given the preliminary nature of the results of this prototype, additional work is required to expand the scope of the model to include additional risk factors, additional information on extant and proposed risk factors, the results of a qualitative risk factor elicitation process, and feedback from utilities and other interested parties involved in the carbon capture project. Additional information on proposed distributions of these risk factors will be integrated into a commercial implementation framework for the purpose of a comparative technology investment analysis.

  17. Omics Tools

    Energy Science and Technology Software Center (OSTI)

    2012-12-21

    The Omics Tools package provides several small trivial tools for work in genomics. This single portable package, the “omics.jar” file, is a toolbox that works in any Java-based environment, including PCs, Macs, and supercomputers. The number of tools is expected to grow. One tool (called cmsearch.hadoop or cmsearch.local), calls the external cmsearch program to predict non-coding RNA in a genome. The cmsearch program is part of the third-party Infernal package. Omics Tools does not containmore » Infernal. Infernal may be installed separately. The cmsearch.hadoop subtool requires Apache Hadoop and runs on a supercomputer, though cmsearch.local does not and runs on a server. Omics Tools does not contain Hadoop. Hadoop mat be installed separartely The other tools (cmgbk, cmgff, fastats, pal, randgrp, randgrpr, randsub) do not interface with third-party tools. Omics Tools is written in Java and Scala programming languages. Invoking the “help” command shows currently available tools, as shown below: schaumbe@gpint06:~/proj/omics$ java -jar omics.jar help Known commands are: cmgbk : compare cmsearch and GenBank Infernal hits cmgff : compare hits among two GFF (version 3) files cmsearch.hadoop : find Infernal hits in a genome, on your supercomputer cmsearch.local : find Infernal hits in a genome, on your workstation fastats : FASTA stats, e.g. # bases, GC content pal : stem-loop motif detection by palindromic sequence search (code stub) randgrp : random subsample without replacement, of groups randgrpr : random subsample with replacement, of groups (fast) randsub : random subsample without replacement, of file lines For more help regarding a particular command, use: java -jar omics.jar command help Usage: java -jar omics.jar command args« less

  18. State Assistance with Risk-Based Data Management: Inventory and needs assessment of 25 state Class II Underground Injection Control programs. Phase 1

    SciTech Connect (OSTI)

    Not Available

    1992-07-01

    As discussed in Section I of the attached report, state agencies must decide where to direct their limited resources in an effort to make optimum use of their available manpower and address those areas that pose the greatest risk to valuable drinking water sources. The Underground Injection Practices Research Foundation (UIPRF) proposed a risk-based data management system (RBDMS) to provide states with the information they need to effectively utilize staff resources, provide dependable documentation to justify program planning, and enhance environmental protection capabilities. The UIPRF structured its approach regarding environmental risk management to include data and information from production, injection, and inactive wells in its RBDMS project. Data from each of these well types is critical to the complete statistical evaluation of environmental risk and selected automated functions. This comprehensive approach allows state Underground Injection Control (UIC) programs to effectively evaluate the risk of contaminating underground sources of drinking water, while alleviating the additional work and associated problems that often arise when separate data bases are used. CH2M Hill and Digital Design Group, through a DOE grant to the UIPRF, completed an inventory and needs assessment of 25 state Class II UIC programs. The states selected for participation by the UIPRF were generally chosen based on interest and whether an active Class II injection well program was in place. The inventory and needs assessment provided an effective means of collecting and analyzing the interest, commitment, design requirements, utilization, and potential benefits of implementing a in individual state UIC programs. Personal contacts were made with representatives from each state to discuss the applicability of a RBDMS in their respective state.

  19. Reading the Tea Leaves: How Utilities in the West Are Managing Carbon Regulatory Risk in their Resource Plans

    SciTech Connect (OSTI)

    Barbose, Galen; Wiser, Ryan; Phadke, Amol; Goldman, Charles

    2008-02-01

    The long economic lifetime and development lead-time of many electric infrastructure investments requires that utility resource planning consider potential costs and risks over a lengthy time horizon. One long-term -- and potentially far-reaching -- risk currently facing the electricity industry is the uncertain cost of future carbon dioxide (CO2) regulations. Recognizing the importance of this issue, many utilities (sometimes spurred by state regulatory requirements) are beginning to actively assess carbon regulatory risk within their resource planning processes, and to evaluate options for mitigating that risk. However, given the relatively recent emergence of this issue and the rapidly changing political landscape, methods and assumptions used to analyze carbon regulatory risk, and the impact of this analysis on the selection of a preferred resource portfolio, vary considerably across utilities. In this study, we examine the treatment of carbon regulatory risk in utility resource planning, through a comparison of the most-recent resource plans filed by fifteen investor-owned and publicly-owned utilities in the Western U.S. Together, these utilities account for approximately 60percent of retail electricity sales in the West, and cover nine of eleven Western states. This report has two related elements. First, we compare and assess utilities' approaches to addressing key analytical issues that arise when considering the risk of future carbon regulations. Second, we summarize the composition and carbon intensity of the preferred resource portfolios selected by these fifteen utilities and compare them to potential CO2 emission benchmark levels.

  20. Communities of Practice: A Tool for Creating Institutional Change...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Communities of Practice: A Tool for Creating Institutional Change in Support of the Mission of the Federal Energy Management Program Communities of Practice: A Tool for Creating ...

  1. Evaluation Prompts ENERGY STAR Program to Replace Web Tool, Saving...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Prompts ENERGY STAR Program to Replace Web Tool, Saving 90 Percent of Annual Costs A ... program managers decided to drop the web tool, eventually replacing it with a ...

  2. SEP Cost Effectiveness ("Screening Tool") | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ("Screening Tool") File Screening Tool More Documents & Publications Adjustment Data Report for Fiscal Years Prior to 2008 Office of Legacy Management FY 2009 Energy...

  3. Research Tools

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Software & Tools Development Network R&D Software-Defined Networking (SDN) Experimental Network Testbeds Performance (perfSONAR) Software & Tools Development Data for Researchers Partnerships Publications Workshops Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1 800-333-7638 (Inside US) 1 510-486-7600 (Globally) 1 510-486-7607 (Globally) Report Network Problems: trouble@es.net Provide Web Site Feedback: info@es.net Software & Tools Development Over the years, ESnet

  4. Federal Energy Management Program (FEMP) Training Resources ...

    Open Energy Info (EERE)

    Management Program (FEMP) Training Resources Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Federal Energy Management Program (FEMP) Training Resources AgencyCompany...

  5. Software Tools

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Software Tools Software Tools Copyright materials are released under different mechanisms: Open Source Software and Portfolio Software. CONTACT thumbnail of Kathleen McDonald Head of Intellectual Property, Business Development Executive Kathleen McDonald Richard P. Feynman Center for Innovation (505) 665-9090 Email The Richard P. Feynman Center for Innovation (FCI) releases copyright materials from Los Alamos under different mechanisms. Open Source Software GitHub Explore all open source

  6. Planning Tool for Strategic Evaluation of Facility Plans - 13570

    SciTech Connect (OSTI)

    Magoulas, Virginia; Cercy, Michael; Hall, Irin

    2013-07-01

    Savannah River National Laboratory (SRNL) has developed a strategic planning tool for the evaluation of the utilization of its unique resources for processing and research and development of nuclear materials. The Planning Tool is a strategic level tool for assessing multiple missions that could be conducted utilizing the SRNL facilities and showcasing the plan. Traditional approaches using standard scheduling tools and laying out a strategy on paper tended to be labor intensive and offered either a limited or cluttered view for visualizing and communicating results. A tool that can assess the process throughput, duration, and utilization of the facility was needed. SRNL teamed with Newport News Shipbuilding (NNS), a division of Huntington Ingalls Industries, to create the next generation Planning Tool. The goal of this collaboration was to create a simulation based tool that allows for quick evaluation of strategies with respect to new or changing missions, and clearly communicates results to the decision makers. This tool has been built upon a mature modeling and simulation software previously developed by NNS. The Planning Tool provides a forum for capturing dependencies, constraints, activity flows, and variable factors. It is also a platform for quickly evaluating multiple mission scenarios, dynamically adding/updating scenarios, generating multiple views for evaluating/communicating results, and understanding where there are areas of risks and opportunities with respect to capacity. The Planning Tool that has been developed is useful in that it presents a clear visual plan for the missions at the Savannah River Site (SRS). It not only assists in communicating the plans to SRS corporate management, but also allows the area stakeholders a visual look at the future plans for SRS. The design of this tool makes it easily deployable to other facility and mission planning endeavors. (authors)

  7. Software and Tools

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Software and Tools Software and Tools The table below shows the software installed on Edison that is managed by modules. Package Category Version Module Install Date Date Made Default A Fortran interface to the GNU Scientific Library (GSL) libraries/ math 1.0.0 fgsl/1.0.0 2015-04-14 2015-04-14 ABINIT applications/ material sciences 7.0.5 abinit/7.0.5 2013-03-12 2013-03-12 ABINIT applications/ material sciences 7.10.2 abinit/7.10.2 2015-01-27 ABINIT applications/ material sciences 7.10.4

  8. Outyear Budgeting Tool

    Energy Science and Technology Software Center (OSTI)

    2010-12-31

    OBTool performs the following: • Consistent method and tool to develop/estimate fiscal year (FY) 2010 and outyear budget/estimates • Maintain configuration control on resource rates and changes to outyear budget estimates, while allowing for accessibility, accountability, and tracking shared access between program managers, facility managers (FMs), project managers (PMs), cost account managers (CAMs), and project controls engineers (PCEs) • Consistency in budget estimating methodology, including scope, requirements, basis of estimates, resources, activities, escalation, and presentationmore » of documentation in tasks and execution plans and reports • Ability to sync (i.e. export) and import data into Primavera and Cobra to the lifecycle baseline file« less

  9. GUIDELINES FOR IMPLEMENTATION OF AN ADVANCED OUTAGE CONTROL CENTER TO IMPROVE OUTAGE COORDINATION, PROBLEM RESOLUTION, AND OUTAGE RISK MANAGEMENT

    SciTech Connect (OSTI)

    Germain, Shawn St; Farris, Ronald; Whaley, April M; Medema, Heather; Gertman, David

    2014-09-01

    This research effort is a part of the Light-Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by Department of Energy (DOE) and performed in close collaboration with industry R&D programs that provide the technical foundations for licensing and managing the long-term, safe, and economical operation of current nuclear power plants. The LWRS program serves to help the U.S. nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. Managing NPP outages is a complex and difficult task due to the large number of maintenance and repair activities that are accomplished in a short period of time. During an outage, the outage control center (OCC) is the temporary command center for outage managers and provides several critical functions for the successful execution of the outage schedule. Essentially, the OCC functions to facilitate information inflow, assist outage management in processing information, and to facilitate the dissemination of information to stakeholders. Currently, outage management activities primarily rely on telephone communication, face to face reports of status, and periodic briefings in the OCC. It is a difficult task to maintain current the information related to outage progress and discovered conditions. Several advanced communication and collaboration technologies have shown promise for facilitating the information flow into, across, and out of the OCC. The use of these technologies will allow information to be shared electronically, providing greater amounts of real-time information to the decision makers and allowing OCC coordinators to meet with supporting staff remotely. Passively monitoring status electronically through advances in the areas of mobile worker technologies, computer-based procedures, and automated work packages will reduce the current reliance on manually reporting progress. The use of these technologies will also improve the knowledge capture and management capabilities of the organization. The purpose of this research is to improve management of NPP outages through the development of an advanced outage control center (AOCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. This technical report for industry implementation outlines methods and considerations for the establishment of an AOCC. This report provides a process for implementation of a change management plan, evaluation of current outage processes, the selection of technology, and guidance for the implementation of the selected technology. Methods are presented for both adoption of technologies within an existing OCC and for a complete OCC replacement, including human factors considerations for OCC design and setup.

  10. Rotor Design Tools

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Design Tools - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management Programs Advanced Nuclear

  11. Risk in the Weapons Stockpile

    SciTech Connect (OSTI)

    Noone, Bailey C

    2012-08-14

    When it comes to the nuclear weapons stockpile, risk must be as low as possible. Design and care to keep the stockpile healthy involves all aspects of risk management. Design diversity is a method that helps to mitigate risk.

  12. Study of Risk Assessment Programs at Federal Agencies and Commercial Industry Related to the Conduct or Regulation of High Hazard Operations

    SciTech Connect (OSTI)

    Bari, R.; Rosenbloom, S.; O'Brien, J.

    2011-03-13

    In the Department of Energy (DOE) Implementation Plan (IP) for Defense Nuclear Facilities Safety Board's Recommendation 2009-1, the DOE committed to studying the use of quantitative risk assessment methodologies at government agencies and industry. This study consisted of document reviews and interviews of senior management and risk assessment staff at six organizations. Data were collected and analyzed on risk assessment applications, risk assessment tools, and controls and infrastructure supporting the correct usage of risk assessment and risk management tools. The study found that the agencies were in different degrees of maturity in the use of risk assessment to support the analysis of high hazard operations and to support decisions related to these operations. Agencies did not share a simple, 'one size fits all' approach to tools, controls, and infrastructure needs. The agencies recognized that flexibility was warranted to allow use of risk assessment tools in a manner that is commensurate with the complexity of the application. The study also found that, even with the lack of some data, agencies application of the risk analysis structured approach could provide useful insights such as potential system vulnerabilities. This study, in combination with a companion study of risk assessment programs in the DOE Offices involved in high hazard operations, is being used to determine the nature and type of controls and infrastructure needed to support risk assessments at the DOE.

  13. Using OSHA`s requirement for the revalidation of PHA`s to comply with EPA`s proposed risk management rule

    SciTech Connect (OSTI)

    Him, M.S.; Mannan, M. [RMT/Jones and Neuse, Inc., Austin, TX (United States)

    1996-11-01

    OSHA`s Process Safety Management rule not only requires the performance of process hazards analyses (PHA`s) of covered areas, but the revalidation of these PHA`s every 5 years. With the May 26, 1997 deadline for the completion of initial PHA`s nearing and the pending approval on or before March 1996 of EPA`s Risk Management Programs (RMP) for Chemical Accidental Release Prevention ({section}40 CFR 68), PSM-covered facilities must start developing plans for compliance with one or more of the requirements of these regulations. This paper discusses some of the strategies that companies falling under Tier 3 of EPA`s RMP rule may use to comply with OSHA`s revalidation of PHA`s and the upcoming EPA rule. The paper also provides details on the use of other PSM elements for PHA revalidation (such as compliance audits and management of change), the development of schedules for PHA revalidation, preparation time, the revalidation process, and the documentation/identification of RMP hazard scenarios.

  14. Using OSHA`s requirement for the revalidation of PHA`STo comply with EPA`s proposed risk management rule

    SciTech Connect (OSTI)

    Him, M.S.; Mannan, M. [RMT/Jones & Neuse, Inc., Austin, TX (United States)

    1996-08-01

    OSHA`s Process Safety Management rule not only requires the performance of process hazards analyses (PHA`s) of covered areas, but the revalidation of these PHA`s every 5 years. With the May 26, 1997 deadline for the completion of initial PHA`s nearing and the pending approval on or before March 1996 of EPA`s Risk Management Programs (RMP) for Chemical Accidental Release Prevention ({section}40 CFR 68), PSM-covered facilities must start developing plans for compliance with one or more of the requirements of these regulations. This paper discusses some of the strategies that companies falling under Tier 3 of EPA`s RMP rule may use to comply with OSHA`s revalidation of PHA`s and the upcoming EPA rule. The paper also provides details on the use of other PSM elements for PHA revalidation (such as compliance audits and management of change), the development of schedules for PHA revalidation, preparation time, the revalidation process, and the documentation/identification of RMP hazard scenarios.

  15. Downhole tool

    DOE Patents [OSTI]

    Hall, David R.; Muradov, Andrei; Pixton, David S.; Dahlgren, Scott Steven; Briscoe, Michael A.

    2007-03-20

    A double shouldered downhole tool connection comprises box and pin connections having mating threads intermediate mating primary and secondary shoulders. The connection further comprises a secondary shoulder component retained in the box connection intermediate a floating component and the primary shoulders. The secondary shoulder component and the pin connection cooperate to transfer a portion of makeup load to the box connection. The downhole tool may be selected from the group consisting of drill pipe, drill collars, production pipe, and reamers. The floating component may be selected from the group consisting of electronics modules, generators, gyroscopes, power sources, and stators. The secondary shoulder component may comprises an interface to the box connection selected from the group consisting of radial grooves, axial grooves, tapered grooves, radial protrusions, axial protrusions, tapered protrusions, shoulders, and threads.

  16. DOE - Office of Legacy Management -- Mound Site

    Office of Legacy Management (LM)

    U.S. Department of Energy Miamisburg Closure Project Risk Management Plan Volume III Legacy Management Transition Risks April 30, 2005 Site Transition Process Upon Cleanup ...

  17. Towards risk-based management of critical infrastructures : enabling insights and analysis methodologies from a focused study of the bulk power grid.

    SciTech Connect (OSTI)

    Richardson, Bryan T.; LaViolette, Randall A.; Cook, Benjamin Koger

    2008-02-01

    This report summarizes research on a holistic analysis framework to assess and manage risks in complex infrastructures, with a specific focus on the bulk electric power grid (grid). A comprehensive model of the grid is described that can approximate the coupled dynamics of its physical, control, and market components. New realism is achieved in a power simulator extended to include relevant control features such as relays. The simulator was applied to understand failure mechanisms in the grid. Results suggest that the implementation of simple controls might significantly alter the distribution of cascade failures in power systems. The absence of cascade failures in our results raises questions about the underlying failure mechanisms responsible for widespread outages, and specifically whether these outages are due to a system effect or large-scale component degradation. Finally, a new agent-based market model for bilateral trades in the short-term bulk power market is presented and compared against industry observations.

  18. Supplemental information related to risk assessment for the off-site transportation of low-level waste for the U.S. Department of Energy waste management programmatic environmental impact statement

    SciTech Connect (OSTI)

    Monette, F.A.; Biwer, B.M.; LePoire, D.J.; Chen, S.Y. [Argonne National Lab., IL (United States). Environmental Assessment Div.

    1996-12-01

    This report presents supplemental information to support the human health risk assessment conducted for the transportation of low-level waste (LLW) in support of the US Department of Energy Waste Management Programmatic Environmental Impact Statement (WM PEIS). Detailed descriptions of the transportation health risk assessment method and results of the assessment are presented in Appendix E of the WM PEIS and are not repeated in this report. This report presents additional information that is not presented in Appendix E but that was needed to conduct the transportation risk assessment for Waste Management (WM) LLW. Included are definition of the LLW alternatives considered in the WM PEIS, data related to the inventory and to the physical and radiological characteristics of WM LLW, an overview of the risk assessment method, and detailed results of the assessment for each WM LLW alternative considered.

  19. Design and field test of collaborative tools in the service of an innovative organization

    SciTech Connect (OSTI)

    De Beler, N.; Parfouru, S. [EdF R and D -Industrial Risk Management Dept., Human Factors Group, 1, avenue du General de Gaulle, 92 141 Clamart Cedex (France)

    2012-07-01

    This paper presents the design process of collaborative tools, based on ICT, aiming at supporting the tasks of the team that manages an outage of an energy production plant for maintenance activities. The design process follows an iterative and multidisciplinary approach, based on a collective tasks modeling of the outage management team in the light of Socio Organizational and Human (SOH) field studies, and on the state of the art of ICT. Field test of the collaborative tools designed plays a great place in this approach, allowing taking into account the operational world but involves also some risks which must be managed. To implement tools on all the production plants, we build an 'operational concept' with a level of description which authorizes the evolution of tools and allows some local adaptations. The field tests provide lessons on the ICT topics. For examples: the status of the remote access tools, the potential of use of a given information input by an actor for several individual and collective purposes, the actors perception of the tools meaning, and the requirements for supporting the implementation of change. (authors)

  20. Collaboration Tools | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services » Information Systems » Collaboration Tools Collaboration Tools Collaboration is much more than just sharing information. It is a form of teamwork and a process of exchanging ideas that positively impacts progress. While it is relatively easy to collaborate with your peers in the office, effective collaboration is difficult to achieve within distributed teams without use of technology. In order to bridge the distance between project teams, Office of Project Management Oversight &

  1. NREL: Transportation Research - Data, Models, and Tools

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Data, Models, and Tools NREL offers models, tools, data, and other resources for vehicle fleet managers, researchers, developers, and others interested in the viability, analysis, and development of advanced transportation technologies and systems. ADOPT: Automotive Deployment Options Projection Tool Modeling tool that predicts consumer demand for different vehicle types based on income distribution and other demographic attributes in a given region. ADOPT's market predictions have been

  2. Cray Reveal Tool Training: Sept 18, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cray Reveal Tool Cray Reveal Tool Training: Sept 18, 2014 Revealplot1 Cray Reveal Webinar: A Tool to Help Porting to Manycore Heidi Poxon, Cray 10:00 - 11:00 PDT, September 18, 2014 Presented as a Web Event only Heidi Poxon, Technical Lead and Manager of Cray Performance Tools, will present a web training on the Cray Reveal Tool for porting to manycore systems. Reveal is a performance analysis and code optimization tool. Reveal assists users optimizing code by providing variable scoping feedback

  3. Records Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Records Management (RM) refers to the systematic identification, creation, capture, organization, maintenance, retrieval, protection, storage and disposition of records, regardless of media, created or received in the transaction of Sandia's scientific investigations and long-term repository performance calculations within a regulatory context. Our disciplined approach to records management makes many things possible: assurance that regulatory requirements are met; reduced risk of expensive

  4. USAID-Forestry Conflict Management Training | Open Energy Information

    Open Energy Info (EERE)

    Forestry Conflict Management Training Jump to: navigation, search Tool Summary LAUNCH TOOL Name: USAID-Forestry Conflict Management Training AgencyCompany Organization: United...

  5. Managing the National Greenhouse Gas Inventory Process | Open...

    Open Energy Info (EERE)

    Managing the National Greenhouse Gas Inventory Process Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Managing the National Greenhouse Gas Inventory Process Agency...

  6. A macro environmental risk assessment methodology for establishing priorities among risks to human health and the environment in the Philippines

    SciTech Connect (OSTI)

    Gernhofer, S.; Oliver, T.J.; Vasquez, R.

    1994-12-31

    A macro environmental risk assessment (ERA) methodology was developed for the Philippine Department of Environment and Natural Resources (DENR) as part of the US Agency for International Development Industrial Environmental Management Project. The DENR allocates its limited resources to mitigate those environmental problems that pose the greatest threat to human health and the environment. The National Regional Industry Prioritization Strategy (NRIPS) methodology was developed as a risk assessment tool to establish a national ranking of industrial facilities. The ranking establishes regional and national priorities, based on risk factors, that DENR can use to determine the most effective allocation of its limited resources. NRIPS is a systematic framework that examines the potential risk to human health and the environment from hazardous substances released from a facility, and, in doing so, generates a relative numerical score that represents that risk. More than 3,300 facilities throughout the Philippines were evaluated successfully with the NRIPS.

  7. Westinghouse Waste Simulation and Optimization Software Tool - 13493

    SciTech Connect (OSTI)

    Mennicken, Kim [Westinghouse Electric Germany GmbH, Global Waste Management, Dudenstrasse 44, D-68167 Mannheim (Germany)] [Westinghouse Electric Germany GmbH, Global Waste Management, Dudenstrasse 44, D-68167 Mannheim (Germany); Aign, Joerg [Westinghouse Electric Germany GmbH, Global Waste Management, Tarpenring 6, D-22419 Hamburg (Germany)] [Westinghouse Electric Germany GmbH, Global Waste Management, Tarpenring 6, D-22419 Hamburg (Germany)

    2013-07-01

    Radioactive waste is produced during NPP operation and NPP D and D. Different kinds of waste with different volumes and properties have to be treated. Finding a technically and commercially optimized waste treatment concept is a difficult and time consuming process. The Westinghouse waste simulation and optimization software tool is an approach to study the total life cycle cost of any waste management facility. The tool enables the user of the simulation and optimization software to plan processes and storage buildings and to identify bottlenecks in the overall waste management design before starting detailed planning activities. Furthermore, application of the software enables the user to optimize the number of treatment systems, to determine the minimum design capacity for onsite storage facilities, to identify bottlenecks in the overall design and to identify the most cost-effective treatment paths by maintaining optimal waste treatment technologies. In combination with proven waste treatment equipment and integrated waste management solutions, the waste simulation and optimization software provides reliable qualitative results that lead to an effective planning and minimization of the total project planning risk of any waste management activity. (authors)

  8. AMERIND Risk Annual Conference and Trade Fair

    Broader source: Energy.gov [DOE]

    Hosted by the AMERIND Risk, this three-day conference includes trainings in risk management, workers' safety, human resources, and more.

  9. Potential enhancements to addressing programmatic risk in the tank waste remediation system (TWRS) program

    SciTech Connect (OSTI)

    Brothers, A.; Fassbender, L.; Bilyard, G.; Levine, L.

    1996-04-01

    Pacific Northwest National Laboratory (PNNL) conducted a Tank Waste Remediation System (TWRS) Risk Management methodology development task. The objective of this task was to develop risk management methodology focused on (1) the use of programmatic risk information in making TWRS architecture selection decisions and (2) the identification/evaluation/selection of TWRS risk-handling actions. Methods for incorporating programmatic risk/uncertainty estimates into trade studies are provided for engineers/analysts. Methods for identifying, evaluating, and selecting risk-handling actions are provided for managers. The guidance provided in this report is designed to help decision-makers make difficult judgments. Current approaches to architecture selection decisions and identification/evaluation/selection of risk-handling actions are summarized. Three categories of sources of programmatic risk (parametric, external, and organizational) are examined. Multiple analytical approaches are presented to enhance the current alternative generation and analysis (AGA) and risk-handling procedures. Appendix A describes some commercially available risk management software tools and Appendix B provides a brief introduction to quantification of risk attitudes. The report provides three levels of analysis for enhancing the AGA Procedure: (1) qualitative discussion coupled with estimated uncertainty ranges for scores in the alternatives-by-criteria matrix; (2) formal elicitation of probability distributions for the alternative scores; and (3) a formal, more structured, comprehensive risk analysis. A framework is also presented for using the AGA programmatic risk analysis results in making better decisions. The report also presents two levels of analysis for evaluation and selection of risk-handling actions: (1) qualitative analysis and judgmental rankings of alternative actions, and (2) Simple Multi-Attribute Rating Technique (SMART).

  10. Ecological Risk Assessments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Community, Environment » Environmental Stewardship » Environmental Protection » Ecological Risk Assessments Ecological Risk Assessments Ecological risk assessment is the appraisal of potential adverse effects of exposure to contaminants on plants and animals. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email The ECORISK Database is a screening tool that helps scientists evaluate impacts on LANL's ecology. Assessing our

  11. Real Property Asset Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    new tools and processes to mitigate risk and maximize performance and lower risks ... Communication & Engagement Intergovernmental Programs EMAB EM SSAB Tribal Programs ...

  12. Frequency Response Analysis Tool

    SciTech Connect (OSTI)

    Etingov, Pavel V.; Kosterev, Dmitry; Dai, T.

    2014-12-31

    Frequency response has received a lot of attention in recent years at the national level, which culminated in the development and approval of North American Electricity Reliability Corporation (NERC) BAL-003-1 Frequency Response and Frequency Bias Setting Reliability Standard. This report is prepared to describe the details of the work conducted by Pacific Northwest National Laboratory (PNNL) in collaboration with the Bonneville Power Administration and Western Electricity Coordinating Council (WECC) Joint Synchronized Information Subcommittee (JSIS) to develop a frequency response analysis tool (FRAT). The document provides the details on the methodology and main features of the FRAT. The tool manages the database of under-frequency events and calculates the frequency response baseline. Frequency response calculations are consistent with frequency response measure (FRM) in NERC BAL-003-1 for an interconnection and balancing authority. The FRAT can use both phasor measurement unit (PMU) data, where available, and supervisory control and data acquisition (SCADA) data. The tool is also capable of automatically generating NERC Frequency Response Survey (FRS) forms required by BAL-003-1 Standard.

  13. Climate Change: Risks and Opportunities for the Finance Sector...

    Open Energy Info (EERE)

    Finance Sector Online Course Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Climate Change: Risks and Opportunities for the Finance Sector Online Course Agency...

  14. Training and Tools | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services » Environment » Radiation Protection of the Public and the Environment » Training and Tools Training and Tools RESidual RADiation (RESRAD) Family of Codes: REDRAD family of Codes are a series of software codes developed by Argonne National Labs (ANL) which are designed to estimate radiation doses and risks from RESidual RADioactive materials. The RESRAD computer codes are important tools that are widely used by the Department, other Federal agencies, and the commercial nuclear

  15. Supervisory Loan Specialist (Strategic Risk)

    Broader source: Energy.gov [DOE]

    This position is located in the Department of Energy (DOE) Loans Programs Office (LPO), Risk Management Division (RMD or LP-40) Strategic Risk Group (LP-40). The incumbent is the supervisor for the...

  16. Proliferation and Terrorism Risk Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Proliferation and Terrorism Risk Assessment Proliferation and Terrorism Risk Assessment The objective of the PTRA program is to develop new tools and approaches for understanding, ...

  17. ORISE: Crisis and Risk Communication

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    U.S. Department of Energy (DOE) Oak Ridge Office (ORO), ORISE provides crisis and risk communication support through the management of its Joint Information Center (JIC)...

  18. Document Flowdown Tool

    SciTech Connect (OSTI)

    2010-12-31

    DFTool performs the following: ? A tool to conduct, capture, document, and manage a systematic review and flowdown of contractual requirements/documents to the site, facility, and project-level implementing documents. ? Ability to alert/email document owners to impending changes/updates and impacts to upper-level linked documents. ? Custom ability to generate reports and/or include custom functionalities based on other needs or consideration for site use. ? Ability to be accessed by all personnel (particularly document owners). ? Shows both document flow-up and flow-down. ? Provides visibility where links/flowdown does not currently exist or is incorrect so it can be changed/updated (no visibility currently exists). ? Ability to capture requirements and ultimately link to an existing/proven requirements-based commitment tracking system which can be used (electively) at the facility/organizational-level

  19. Document Flowdown Tool

    Energy Science and Technology Software Center (OSTI)

    2010-12-31

    DFTool performs the following: • A tool to conduct, capture, document, and manage a systematic review and flowdown of contractual requirements/documents to the site, facility, and project-level implementing documents. • Ability to alert/email document owners to impending changes/updates and impacts to upper-level linked documents. • Custom ability to generate reports and/or include custom functionalities based on other needs or consideration for site use. • Ability to be accessed by all personnel (particularly document owners). •more » Shows both document flow-up and flow-down. • Provides visibility where links/flowdown does not currently exist or is incorrect so it can be changed/updated (no visibility currently exists). • Ability to capture requirements and ultimately link to an existing/proven requirements-based commitment tracking system which can be used (electively) at the facility/organizational-level« less

  20. ENERGY STAR® Portfolio Manager® Guidance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Portfolio Manager Guidance ENERGY STAR Portfolio Manager Guidance EPA's ENERGY STAR Portfolio Manager is an online tool you can use to measure and track energy and water ...

  1. Category:Community Energy Tools | Open Energy Information

    Open Energy Info (EERE)

    Finance H Hara Environmental and Energy Management Solution HOMER Hybrid Car Calculator Hydrogen Demand and Resource Assessment Tool I ICLEI and REN21 Local Renewables Web Portal...

  2. Arizona Online Environmental Review Tool | Open Energy Information

    Open Energy Info (EERE)

    Online Environmental Review ToolInfo GraphicMapChart Abstract The Arizona Game and Fish Department's Heritage Data Management System (HDMS) and Project Evaluation Program...

  3. Augmented reality building operations tool

    DOE Patents [OSTI]

    Brackney, Larry J.

    2014-09-09

    A method (700) for providing an augmented reality operations tool to a mobile client (642) positioned in a building (604). The method (700) includes, with a server (660), receiving (720) from the client (642) an augmented reality request for building system equipment (612) managed by an energy management system (EMS) (620). The method (700) includes transmitting (740) a data request for the equipment (612) to the EMS (620) and receiving (750) building management data (634) for the equipment (612). The method (700) includes generating (760) an overlay (656) with an object created based on the building management data (634), which may be sensor data, diagnostic procedures, or the like. The overlay (656) is configured for concurrent display on a display screen (652) of the client (642) with a real-time image of the building equipment (612). The method (700) includes transmitting (770) the overlay (656) to the client (642).

  4. Project Management Methodology | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    provides the tools and guidance necessary to ensure consistent and effective management oversight of performer performance and consolidated reporting. The project management...

  5. Report to the Environmental Management Advisory Board

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Report to the Environmental Management Advisory Board Evaluation of the United States Department of Energy Environmental Management Strategic Planning Communication Tool Submitted ...

  6. New Geothermal Exploration and Management Tools | Department...

    Broader source: Energy.gov (indexed) [DOE]

    The university developed a method to comprehensively target geothermal drilling by combining geophysical data sets to generate more complete images of the subsurface and fluid flow ...

  7. Computer Security Risk Assessment

    Energy Science and Technology Software Center (OSTI)

    1992-02-11

    LAVA/CS (LAVA for Computer Security) is an application of the Los Alamos Vulnerability Assessment (LAVA) methodology specific to computer and information security. The software serves as a generic tool for identifying vulnerabilities in computer and information security safeguards systems. Although it does not perform a full risk assessment, the results from its analysis may provide valuable insights into security problems. LAVA/CS assumes that the system is exposed to both natural and environmental hazards and tomore » deliberate malevolent actions by either insiders or outsiders. The user in the process of answering the LAVA/CS questionnaire identifies missing safeguards in 34 areas ranging from password management to personnel security and internal audit practices. Specific safeguards protecting a generic set of assets (or targets) from a generic set of threats (or adversaries) are considered. There are four generic assets: the facility, the organization''s environment; the hardware, all computer-related hardware; the software, the information in machine-readable form stored both on-line or on transportable media; and the documents and displays, the information in human-readable form stored as hard-copy materials (manuals, reports, listings in full-size or microform), film, and screen displays. Two generic threats are considered: natural and environmental hazards, storms, fires, power abnormalities, water and accidental maintenance damage; and on-site human threats, both intentional and accidental acts attributable to a perpetrator on the facility''s premises.« less

  8. Preset pivotal tool holder

    DOE Patents [OSTI]

    Asmanes, Charles

    1979-01-01

    A tool fixture is provided for precise pre-alignment of a radiused edge cutting tool in a tool holder relative to a fixed reference pivot point established on said holder about which the tool holder may be selectively pivoted relative to the fixture base member to change the contact point of the tool cutting edge with a workpiece while maintaining the precise same tool cutting radius relative to the reference pivot point.

  9. Real Time Grid Reliability Management 2005

    SciTech Connect (OSTI)

    Eto, Joe; Eto, Joe; Lesieutre, Bernard; Lewis, Nancy Jo; Parashar, Manu

    2008-07-07

    The increased need to manage California?s electricity grid in real time is a result of the ongoing transition from a system operated by vertically-integrated utilities serving native loads to one operated by an independent system operator supporting competitive energy markets. During this transition period, the traditional approach to reliability management -- construction of new transmission lines -- has not been pursued due to unresolved issues related to the financing and recovery of transmission project costs. In the absence of investments in new transmission infrastructure, the best strategy for managing reliability is to equip system operators with better real-time information about actual operating margins so that they can better understand and manage the risk of operating closer to the edge. A companion strategy is to address known deficiencies in offline modeling tools that are needed to ground the use of improved real-time tools. This project: (1) developed and conducted first-ever demonstrations of two prototype real-time software tools for voltage security assessment and phasor monitoring; and (2) prepared a scoping study on improving load and generator response models. Additional funding through two separate subsequent work authorizations has already been provided to build upon the work initiated in this project.

  10. Environmental restoration risk-based prioritization work package planning and risk ranking methodology. Revision 2

    SciTech Connect (OSTI)

    Dail, J.L.; Nanstad, L.D.; White, R.K.

    1995-06-01

    This document presents the risk-based prioritization methodology developed to evaluate and rank Environmental Restoration (ER) work packages at the five US Department of Energy, Oak Ridge Field Office (DOE-ORO) sites [i.e., Oak Ridge K-25 Site (K-25), Portsmouth Gaseous Diffusion Plant (PORTS), Paducah Gaseous Diffusion Plant (PGDP), Oak Ridge National Laboratory (ORNL), and the Oak Ridge Y-12 Plant (Y-12)], the ER Off-site Program, and Central ER. This prioritization methodology was developed to support the increased rigor and formality of work planning in the overall conduct of operations within the DOE-ORO ER Program. Prioritization is conducted as an integral component of the fiscal ER funding cycle to establish program budget priorities. The purpose of the ER risk-based prioritization methodology is to provide ER management with the tools and processes needed to evaluate, compare, prioritize, and justify fiscal budget decisions for a diverse set of remedial action, decontamination and decommissioning, and waste management activities. The methodology provides the ER Program with a framework for (1) organizing information about identified DOE-ORO environmental problems, (2) generating qualitative assessments of the long- and short-term risks posed by DOE-ORO environmental problems, and (3) evaluating the benefits associated with candidate work packages designed to reduce those risks. Prioritization is conducted to rank ER work packages on the basis of the overall value (e.g., risk reduction, stakeholder confidence) each package provides to the ER Program. Application of the methodology yields individual work package ``scores`` and rankings that are used to develop fiscal budget requests. This document presents the technical basis for the decision support tools and process.

  11. Smart Grid Tools and Technology

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tools and Technology - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management Programs Advanced

  12. Solar Glare Hazard Analysis Tool

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Glare Hazard Analysis Tool - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management Programs

  13. ENERGY STAR Webinar: Portfolio Manager 201

    Broader source: Energy.gov [DOE]

    This webinar continues on the U.S. Environmental Protection Agency's (EPA's) new ENERGY STAR Portfolio Manager tool.

  14. Some aspects of computer aided decision making for the crisis management of unstable slopes

    SciTech Connect (OSTI)

    Faure, R.M.; Pairault, T.; Pham, M.; Bernardeau-Moreau, A.; Fayolle, G.; Robinson, J.C.; Foucheyrand, G.

    1995-12-31

    The authors present here the developments in their risk management research; software tools based on object oriented techniques, an image and graphics based man-machine interface, a new algorithm which allows the quick construction of a GIS, strong links with analysis software with the possibility of using fuzzy logic reasoning. The case of the threatening landslide at Sechilienne (Isere, France), studied using these tools, is briefly presented. The authors will show that is management is facilitated through the use of networks as in the WASSS project approach.

  15. Energy Performance Indicator Tool | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Performance Indicator Tool Energy Performance Indicator Tool October 22, 2014 - 10:57am Addthis The EnPI V4.0 is a regression analysis based tool developed by the U.S. Department of Energy to help plant and corporate managers establish a normalized baseline of energy consumption, track annual progress of intensity improvements, energy savings, Superior Energy Performance (SEP) EnPIs, and other EnPIs that account for variations due to weather, production, and other variables. The tool is

  16. Ootw Tool Requirements in Relation to JWARS

    SciTech Connect (OSTI)

    Hartley III, D.S.; Packard, S.L.

    1998-01-01

    This document reports the results of the CMke of the Secretary of Defense/Program Analysis & Evaluation (OSD/PA&E) sponsored project to identify how Operations Other Than War (OOTW) tool requirements relate to the Joint Warfare Simulation (JWARS) and, more generally, to joint analytical modeling and simulation (M&S) requirements. It includes recommendations about which OOTW tools (and functionality within tools) should be included in JWARS, which should be managed as joint analytical modeling and simulation (M&S) tools, and which should be left for independent development.

  17. Alternative D and D Planning Tool - 12466

    SciTech Connect (OSTI)

    Starling, D.A.; Schubert, A.L.; Bergener, T.W.

    2012-07-01

    On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began cleanup of the East Tennessee Technology Park (ETTP). UCOR's $2.2 billion contract has an initial five-year term and a four-year option period for completing the cleanup of ETTP and performing surveillance and maintenance and waste management operations at both the Oak Ridge National Laboratory and the Y-12 National Security Complex. ETTP D and D work includes disposition of large, complex, contaminated, Manhattan Project-era facilities such as the K-25 and K-27 uranium enrichment facilities. At ETTP, UCOR views the D and D process as a 'Waste Factory' with waste production lines from the point-of-generation to the point-of-disposal. Safely transforming vertically-standing buildings into horizontally-lying waste in a disposal facility is the primary cleanup objective. Whereas a factory produces widgets, D and D produces waste-lots of waste. In support of the Waste Factory view, UCOR is developing a systems planning tool to help better plan how to effect cleanup by improving waste planning, uniting waste generator with waste dis-positioner, and represent the 'waste factory' in a computer model that allows the D and D and waste management teams to better understand available disposal paths, waste uncertainties and potential consequences, driving variables, and sensitivity to changes. Any model of reality represents a compromise. Part of the Waste Factory Model's value may be in providing standardization and relative direction for assisting decision making as opposed to absolute cost or schedule answers. From that relative direction, management can commission detailed planning and estimating. Also, the model's output credibility is tied directly to its input quality. That is why, as discussed above, the Waste Factory Model's key informational component will be the standardized waste streams (e.g., Structure/Debris disposed at EMWMF) and associated standardized unit costs. The model development process generally, and the development team's collaboration, specifically, is most important. Building-in this integrity up-front, transparently, will help ensure that the model outputs are known, understood, and credible (no mysterious 'black-box' components). The Waste Factory Model is envisioned to help improve understanding of a given project's waste implications; help reveal and suggest the important few variables out of the trivial many; reveal likely process bottlenecks, and help focus risk mitigation and assumption management efforts to better manage the projected total cost. In the long term, the UCOR team's goal is to incorporate an information feedback loop to help improve the accuracy of key model attributes, such as the standardized cost information. This way, by design, the model output should improve over time and thus help the model mature into both a credible scenario tool and a standardized project planning resource. The initial model capabilities may be narrow, but with time and effort it may prove to be a timely and cost-effective tool. (authors)

  18. Interactive Activity Detection Tools

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Activity Detection Tools Interactive Activity Detection Tools Tools for detecting specified activities in video data provide a key intelligence capability. High numbers of false alarms, however, reduce tool effectiveness and analyst patience. User feedback reduces false alarms * This project will reduce the number of false alarms generated by activity detection tools (including single vehicle start / stop, multi-vehicle meetings and coordinated driving patterns) by exploiting user feedback in a

  19. Performance and Debugging Tools

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tools Performance and Debugging Tools NERSC provides many popular debugging and profiling tools. Some of them are general-purpose tools and others are geared toward more specific tasks. A quick guideline on when to use which debugging tool is as follows: DDT and TotalView: general purpose parallel debuggers allowing users to interactively control the pace of execution of a program using a graphical user interface gdb: serial command line mode debugger; can be useful in quickly examining core

  20. 2016 DOE Project Management Workshop | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to project management, the Project Management Risk Committee, congressional views, ethics, and program perspectives from Environmental Management, Science, and the National...

  1. 2007 Wholesale Power Rate Case Initial Proposal : Risk Analysis Study Documentation.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    2005-11-01

    The RiskMod Model is comprised of a set of risk simulation models, collectively referred to as RiskSim; a set of computer programs that manages data referred to as Data Management Procedures; and RevSim, a model that calculates net revenues. RiskMod interacts with the AURORA Model, the RAM2007, and the ToolKit Model during the process of performing the Risk Analysis Study. AURORA is the computer model being used to perform the Market Price Forecast Study (see Market Price Forecast Study, WP-07-E-BPA-03); the RAM2007 is the computer model being used to calculate rates (see Wholesale Power Rate Development Study, WP-07-E-BPA-05); and the ToolKit is the computer model being used to develop the risk mitigation package that achieves BPA's 92.6 percent TPP standard (see Section 3 in the Risk Analysis Study, WP-07-E-BPA-04). Variations in monthly loads, resources, natural gas prices, forward market electricity prices, transmission expenses, and aluminum smelter benefit payments are simulated in RiskSim. Monthly spot market electricity prices for the simulated loads, resources, and natural gas prices are estimated by the AURORA Model. Data Management Procedures facilitate the format and movement of data that flow to and/or from RiskSim, AURORA, and RevSim. RevSim estimates net revenues using risk data from RiskSim, spot market electricity prices from AURORA, loads and resources data from the Load Resource Study, WP-07-E-BPA-01, various revenues from the Revenue Forecast component of the Wholesale Power Rate Development Study, WP-07-E-BPA-05, and rates and expenses from the RAM2007. Annual average surplus energy revenues, purchased power expenses, and section 4(h)(10)(C) credits calculated by RevSim are used in the Revenue Forecast and the RAM2007. Heavy Load Hour (HLH) and Light Load Hour (LLH) surplus and deficit energy values from RevSim are used in the Transmission Expense Risk Model. Net revenues estimated for each simulation by RevSim are input into the ToolKit Model to develop the risk mitigation package that achieves BPA's 92.6 percent TPP standard. The processes and interaction between each of the models and studies are depicted in Graph 1.

  2. 2007 Wholesale Power Rate Case Final Proposal : Risk Analysis Study Documentation.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    2006-07-01

    The RiskMod Model is comprised of a set of risk simulation models, collectively referred to as RiskSim; a set of computer programs that manages data referred to as Data Management Procedures; and RevSim, a model that calculates net revenues. RiskMod interacts with the AURORA Model, the RAM2007, and the ToolKit Model during the process of performing the Risk Analysis Study. AURORA is the computer model being used to perform the Market Price Forecast Study (see Market Price Forecast Study, WP-07-FS-BPA-03); the RAM2007 is the computer model being used to calculate rates (see Wholesale Power Rate Development Study, WP-07-FS-BPA-05); and the ToolKit is the computer model being used to develop the risk mitigation package that achieves BPA's 92.6 percent TPP standard (see Section 3 in the Risk Analysis Study, WP-07-FS-BPA-04). Variations in monthly loads, resources, natural gas prices, forward market electricity prices, transmission expenses, and aluminum smelter benefit payments are simulated in RiskSim. Monthly spot market electricity prices for the simulated loads, resources, and natural gas prices are estimated by the AURORA Model. Data Management Procedures facilitate the format and movement of data that flow to and/or from RiskSim, AURORA, and RevSim. RevSim estimates net revenues using risk data from RiskSim, spot market electricity prices from AURORA, loads and resources data from the Load Resource Study, WP-07-FS-BPA-01, various revenues from the Revenue Forecast component of the Wholesale Power Rate Development Study, WP-07-FSBPA-05, and rates and expenses from the RAM2007. Annual average surplus energy revenues, purchased power expenses, and section 4(h)(10)(C) credits calculated by RevSim are used in the Revenue Forecast and the RAM2007. Heavy Load Hour (HLH) and Light Load Hour (LLH) surplus and deficit energy values from RevSim are used in the Transmission Expense Risk Model. Net revenues estimated for each simulation by RevSim are input into the ToolKit Model to develop the risk mitigation package that achieves BPA's 92.6 percent TPP standard. The processes and interaction between each of the models and studies are depicted in Graph 1.

  3. Executive Order 11988: Floodplain Management | Department of...

    Energy Savers [EERE]

    Management More Documents & Publications EO 13690: Establishing a Federal Flood Risk Management Standard and a Process for Further Soliciting and Considering Stakeholder...

  4. Data Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Data Management Data Management PDSF and IHEP, in Beijing, China, are the two main computing facitilies for the Daya Bay experiment with PDSF being used primarily by North American collaborators and IHEP by Asian collaborators. All raw data from the experimental facility is first transferred to IHEP and then transferred to PDSF. Data transfer rates of 5 to 10 MB/s result in up to about 500GB transferred daily. The tool used to transfer the data is called SPADE and has also been used at PDSF by

  5. ENERGY STAR Portfolio Manager 101

    Broader source: Energy.gov [DOE]

    Join us as we introduce and demonstrate the core functionality of EPA’s ENERGY STAR Portfolio Manager tool. Attendees will learn how to: navigate Portfolio Manager; add a property and enter details...

  6. ENERGY STAR Portfolio Manager 201

    Broader source: Energy.gov [DOE]

    Continue to learn about EPA’s new ENERGY STAR Portfolio Manager tool, with a deeper dive into more advanced functionalities such as: managing and tracking changes to your property uses over time;...

  7. Facilities Information Management System (FIMS)

    Broader source: Energy.gov [DOE]

     FIMS is DOE’s corporate database for real property as required by DOE Order 430.1B, Real Property Asset Management. The system provides DOE with an accurate inventory and management tool that...

  8. Tool grinding machine

    DOE Patents [OSTI]

    Dial, Sr., Charles E.

    1980-01-01

    The present invention relates to an improved tool grinding mechanism for grinding single point diamond cutting tools to precise roundness and radius specifications. The present invention utilizes a tool holder which is longitudinally displaced with respect to the remainder of the grinding system due to contact of the tool with the grinding surface with this displacement being monitored so that any variation in the grinding of the cutting surface such as caused by crystal orientation or tool thickness may be compensated for during the grinding operation to assure the attainment of the desired cutting tool face specifications.

  9. Improved tool grinding machine

    DOE Patents [OSTI]

    Dial, C.E. Sr.

    The present invention relates to an improved tool grinding mechanism for grinding single point diamond cutting tools to precise roundness and radius specifications. The present invention utilizes a tool holder which is longitudinally displaced with respect to the remainder of the grinding system due to contact of the tool with the grinding surface with this displacement being monitored so that any variation in the grinding of the cutting surface such as caused by crystal orientation or tool thicknesses may be compensated for during the grinding operation to assure the attainment of the desired cutting tool face specifications.

  10. The risk assessment information system

    SciTech Connect (OSTI)

    Kerr, S.B.; Bonczek, R.R.; McGinn, C.W.; Land, M.L.; Bloom, L.D.; Sample, B.E.; Dolislager, F.G.

    1998-06-01

    In an effort to provide service-oriented environmental risk assessment expertise, the Department of Energy (DOE) Center for Risk Excellence (CRE) and DOE Oak Ridge Operations Office (ORO) are sponsoring Oak Ridge National Laboratory (ORNL) to develop a web-based system for disseminating risk tools and information to its users. This system, the Risk Assessment Information System (RAIS), was initially developed to support the site-specific needs of the DOE-ORO Environmental Restoration Risk Assessment Program. With support from the CRE, the system is currently being expanded to benefit all DOE risk information users and can be tailored to meet site-specific needs. Taking advantage of searchable and executable databases, menu-driven queries, and data downloads, using the latest World Wide Web technologies, the RAIS offers essential tools that are used in the risk assessment process or anywhere from project scoping to implementation. The RAIS tools can be located directly at http://risk.lsd.ornl.gov/homepage/rap{_}tool.htm or through the CRE`s homepage at http://www.doe.gov/riskcenter/home.html.

  11. NERSC Data Management Policies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Data Management Policies NERSC Data Management Policies Introduction NERSC provides its users with the means to store, manage, and share their research data products. In addition to systems specifically tailored for data-intensive computations, we provide a variety of storage resources optimized for different phases of the data lifecycle; tools to enable users to manage, protect, and control their data; high-speed networks for intra-site and inter-site (ESnet) data transfer; gateways and portals

  12. ARM - Data Tools

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    govDataData Tools Data Tools Software for Working with ARM NetCDF Data Most ARM data are archived and made available as time-series data in netCDF format. NetCDF (designed by ...

  13. OOTW COST TOOLS

    SciTech Connect (OSTI)

    HARTLEY, D.S.III; PACKARD, S.L.

    1998-09-01

    This document reports the results of a study of cost tools to support the analysis of Operations Other Than War (OOTW). It recommends the continued development of the Department of Defense (DoD) Contingency Operational Support Tool (COST) as the basic cost analysis tool for 00TWS. It also recommends modifications to be included in future versions of COST and the development of an 00TW mission planning tool to supply valid input for costing.

  14. Demand Response Dispatch Tool

    SciTech Connect (OSTI)

    2012-08-31

    The Demand Response (DR) Dispatch Tool uses price profiles to dispatch demand response resources and create load modifying profiles. These annual profiles are used as inputs to production cost models and regional planning tools (e.g., PROMOD). The tool has been effectively implemented in transmission planning studies conducted by the Western Electricity Coordinating Council via its Transmission Expansion Planning and Policy Committee. The DR Dispatch Tool can properly model the dispatch of DR resources for both reliability and economic conditions.

  15. Caliper and contour tool

    DOE Patents [OSTI]

    Fink, C.F.

    The disclosure relates to a tool for borehole logging comprising a plurality of extendable caliper arms to determine borehole contour.

  16. Caliper and contour tool

    DOE Patents [OSTI]

    Fink, Conrad F. (Los Alamos, NM)

    1981-01-01

    The disclosure relates to a tool for borehole logging comprising a plurality of extendable caliper arms to determine borehole contour.

  17. Using High Performance Libraries and Tools

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    High Performance Libraries and Tools Using High Performance Libraries and Tools Memkind Library on Edison The memkind library is a user extensible heap manager built on top of jemalloc which enables control of memory characteristics and a partitioning of the heap between kinds of memory (including user defined kinds of memory). This library can be used to simulate the benefit of the high bandwidth memory that will be available on KNL system on the dual socket Edison compute nodes (the two

  18. Fluid sampling tool

    DOE Patents [OSTI]

    Garcia, Anthony R.; Johnston, Roger G.; Martinez, Ronald K.

    2000-01-01

    A fluid-sampling tool for obtaining a fluid sample from a container. When used in combination with a rotatable drill, the tool bores a hole into a container wall, withdraws a fluid sample from the container, and seals the borehole. The tool collects fluid sample without exposing the operator or the environment to the fluid or to wall shavings from the container.

  19. Configuration Management Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Configuration Management Plan Configuration Management Plan This template is used for documenting the configuration management methodology, tools, techniques, roles and responsibilities and tasks for a systems development project. PDF icon Configuration Management Plan More Documents & Publications SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Software Configuration Management Checklist NMMSS Software Quality Assurance Plan Software Configuration Management (SCM) A Practical Guid

  20. DOE-Energy 101: Energy Management Monthly Training | Open Energy...

    Open Energy Info (EERE)

    DOE-Energy 101: Energy Management Monthly Training (Redirected from Energy 101 Training) Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Energy 101 Training Agency...

  1. DOE-Energy 101: Energy Management Monthly Training | Open Energy...

    Open Energy Info (EERE)

    Energy 101: Energy Management Monthly Training Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Energy 101 Training AgencyCompany Organization: United States Department...

  2. Project Management Coordination Office | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Management Coordination Office Project Management Coordination Office The Project Management Coordination Office (PMCO) provides guidance, leadership, training, and tools in program and project management.to Office of Energy Efficiency and Renewable Energy (EERE) Headquarters and field employees. PMCO is an internal business operations office with a mission to provide EERE executive managers, line managers, and staff offices the unified corporate tools, products, and services that enable

  3. EISA 432 Energy Audits Best Practices: Software Tools

    SciTech Connect (OSTI)

    Maryl Fisher

    2014-11-01

    Five whole building analysis software tools that can aid an energy manager with fulfilling energy audit and commissioning/retro-commissioning requirements were selected for review in this best practices study. A description of each software tool is provided as well as a discussion of the user interface and level of expertise required for each tool, a review of how to use the tool for analyzing energy conservation opportunities, the format and content of reports generated by the tool, and a discussion on the applicability of the tool for commissioning.

  4. Tool setting device

    DOE Patents [OSTI]

    Brown, Raymond J.

    1977-01-01

    The present invention relates to a tool setting device for use with numerically controlled machine tools, such as lathes and milling machines. A reference position of the machine tool relative to the workpiece along both the X and Y axes is utilized by the control circuit for driving the tool through its program. This reference position is determined for both axes by displacing a single linear variable displacement transducer (LVDT) with the machine tool through a T-shaped pivotal bar. The use of the T-shaped bar allows the cutting tool to be moved sequentially in the X or Y direction for indicating the actual position of the machine tool relative to the predetermined desired position in the numerical control circuit by using a single LVDT.

  5. Status of Environmental Management Initiatives to Accelerate the Reduction of Environmental Risks and Challenges Posed by the Legacy of the Cold War

    Broader source: Energy.gov [DOE]

    This Report to Congress was prepared pursuant to section 3130 of the National Defense Authorization Act (NDAA) for Fiscal Year (FY) 2008, and summarized the EM program and initiatives to accelerate the reduction of environmental risks and challenges posed by the legacy of the Cold War.

  6. Resources for global risk assessment: The International Toxicity Estimates for Risk (ITER) and Risk Information Exchange (RiskIE) databases

    SciTech Connect (OSTI)

    Wullenweber, Andrea Kroner, Oliver; Kohrman, Melissa; Maier, Andrew; Dourson, Michael; Rak, Andrew; Wexler, Philip; Tomljanovic, Chuck

    2008-11-15

    The rate of chemical synthesis and use has outpaced the development of risk values and the resolution of risk assessment methodology questions. In addition, available risk values derived by different organizations may vary due to scientific judgments, mission of the organization, or use of more recently published data. Further, each organization derives values for a unique chemical list so it can be challenging to locate data on a given chemical. Two Internet resources are available to address these issues. First, the International Toxicity Estimates for Risk (ITER) database ( (www.tera.org/iter)) provides chronic human health risk assessment data from a variety of organizations worldwide in a side-by-side format, explains differences in risk values derived by different organizations, and links directly to each organization's website for more detailed information. It is also the only database that includes risk information from independent parties whose risk values have undergone independent peer review. Second, the Risk Information Exchange (RiskIE) is a database of in progress chemical risk assessment work, and includes non-chemical information related to human health risk assessment, such as training modules, white papers and risk documents. RiskIE is available at (http://www.allianceforrisk.org/RiskIE.htm), and will join ITER on National Library of Medicine's TOXNET ( (http://toxnet.nlm.nih.gov/)). Together, ITER and RiskIE provide risk assessors essential tools for easily identifying and comparing available risk data, for sharing in progress assessments, and for enhancing interaction among risk assessment groups to decrease duplication of effort and to harmonize risk assessment procedures across organizations.

  7. Tools for the Mentee | Department of Energy

    Energy Savers [EERE]

    Superior Energy Performance » Toolbox and Expertise Toolbox and Expertise Superior Energy Performance logo Proven tools, expert guidance, training, and other resources are available that you can use to improve energy management at your facility. The free DOE eGuide provides step-by-step guidance to standup or enhance your energy management system (EnMS). Hire experts to fill gaps or train in-house staff. Contact your utility and consider becoming a Better Plant Partner to gain additional

  8. integrated-planning-and-operational-tools

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Announcement Presentation at Argonne TRACC March 29, 2011 11:00 AM(CST) Dr. Yue Liu Assistant Professor Department of Civil Engineering University of Wisconsin - Milwaukee Integrated planning and operational tools for emergency evacuation traffic management: case studies and system application in Washington DC Metropolitan Area ABSTRACT The evacuation of large municipal areas in an efficient manner during emergencies and disasters is one of the critical tasks faced by emergency management

  9. Integrated Planning and Performance Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Process Maintain Lab Agenda Prepare ALP Program Execution Plan PEMP PreparationApproval POG Support CAS M-3 Implementation FNAL Enterprise Risk Management...

  10. Alternative Fuels Data Center: Tools

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Tools to someone by E-mail Share Alternative Fuels Data Center: Tools on Facebook Tweet about Alternative Fuels Data Center: Tools on Twitter Bookmark Alternative Fuels Data Center: Tools on Google Bookmark Alternative Fuels Data Center: Tools on Delicious Rank Alternative Fuels Data Center: Tools on Digg Find More places to share Alternative Fuels Data Center: Tools on AddThis.com... Tools The Alternative Fuels Data Center offers a large collection of helpful tools. These calculators,

  11. High Risk Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDF icon High Risk Plan More Documents & Publications DOE Site Facility Management Contracts Internet Posting DOE Head of Contracting Activity and Procurement Directors' Directory ...

  12. Summary - Major Risk Factors Integrated Facility Disposition...

    Office of Environmental Management (EM)

    Office of Environmental Management (DOE-EM) External Technical Review of the Major Risk Factors Integrated Facility Disposition Project (IFDP) Oak Ridge, TN Why DOE-EM Did...

  13. Machine tool locator

    DOE Patents [OSTI]

    Hanlon, John A.; Gill, Timothy J.

    2001-01-01

    Machine tools can be accurately measured and positioned on manufacturing machines within very small tolerances by use of an autocollimator on a 3-axis mount on a manufacturing machine and positioned so as to focus on a reference tooling ball or a machine tool, a digital camera connected to the viewing end of the autocollimator, and a marker and measure generator for receiving digital images from the camera, then displaying or measuring distances between the projection reticle and the reference reticle on the monitoring screen, and relating the distances to the actual position of the autocollimator relative to the reference tooling ball. The images and measurements are used to set the position of the machine tool and to measure the size and shape of the machine tool tip, and examine cutting edge wear. patent

  14. Understanding and managing health and environmental risks of CIS, CGS, and CdTe photovoltaic module production and use: A workshop

    SciTech Connect (OSTI)

    Moskowitz, P.D.; Zweibel, K.; DePhillips, M.P.

    1994-04-28

    Environmental, health and safety (EH&S) risks presented by CIS, CGS and CdTe photovoltaic module production, use and decommissioning have been reviewed and discussed by several authors. Several EH&S concerns exit. The estimated EH&S risks are based on extrapolations of toxicity, environmental mobility, and bioavailability data for other related inorganic compounds. Sparse data, however, are available for CIS, CGS or CdTe. In response to the increased interest in these materials, Brookhaven National Laboratory (BNL) has been engaged in a cooperative research program with the National Renewable Energy Laboratory (NREL), the Fraunhofer Institute for Solid State Technology (IFT), the Institute of Ecotoxicity of the GSF Forschungszentrum fair Umwelt und Gesundheit, and the National Institute of Environmental Health Sciences (NIEHS) to develop fundamental toxicological and environmental data for these three compounds. This workshop report describes the results of these studies and describes their potential implications with respect to the EH&S risks presented by CIS, CGS, and CdTe module production, use and decommissioning.

  15. Wachs Cutter Tooling Station (4495)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    purchase, build and install Wachs cutter tooling. The Wachs Cutter Tooling Station is similar to previously operated facility tooling and will utilize an existing hydraulic unit....

  16. Software Tools | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Windows and Building Envelope Software Tools Software Tools See past projects. Fenestration Software Tools Lead Performer: Lawrence Berkeley National Laboratory - Berkeley, CA

  17. Pumping System Assessment Tool

    Broader source: Energy.gov [DOE]

    The Pumping System Assessment Tool (PSAT) is a free online software tool to help industrial users assess the efficiency of pumping system operations. PSAT uses achievable pump performance data from Hydraulic Institute standards and motor performance data from the MotorMaster+ database to calculate potential energy and associated cost savings. The tool also enables users to save and retrieve log files, default values, and system curves for sharing analyses with other users.

  18. HPC_Tools.pptx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5, 2011 * Introduction * Debugging * Performance / Optimization Outline 3 * Scope of Today's Talks - Debugging and optimization tools - Some basic strategies * Take Aways - Common problems and strategies - How tools work in general - A few specific tools you can try Introduction 4 * Types of problems - "Serial" * Invalid memory references * Array reference out of bounds * Divide by zero * Uninitialized variables - Parallel * Unmatched sends/receives * Blocking receive before

  19. Management Rachana Ananthakrishnan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Globus for Data Management Rachana Ananthakrishnan (ranantha@uchicago.edu) Computation Institute Data Management Challenges * "Transfers often take longer than expected based on available network capacities" * "Lack of an easy to use interface to some of the high-performance tools" * "Tools [are] too difficult to install and use" * "Time and interruption to other work required to supervise large data transfers" * "Need data transfer tools that are

  20. Using DOE Tools

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... sf): - Phipps Center for Sustainable Landscape (CSL) 23,000 sf - Ft Belvoir 48,000 sf ... less time than many building assessment tools. * Simplified input criteria ...

  1. lustre-tools-llnl

    Energy Science and Technology Software Center (OSTI)

    2010-12-17

    lustre-tools-llnl is a small set of commands that are helpful for using and administering a lustre file system.

  2. AIRMaster+ Tool Introduction

    Broader source: Energy.gov [DOE]

    This presentation discusses typical compressed air system operation and discusses methods of system efficiency improvement through use of the AIRMaster+ and CAC LogTool software.

  3. Manifold tool guide

    DOE Patents [OSTI]

    Djordjevic, A.

    1983-12-27

    A tool guide is described that makes possible the insertion of cleaning and/or inspection tools into a manifold pipe that will dislocate and extract the accumulated sediment in such manifold pipes. The tool guide basically comprises a right angled tube (or other angled tube as required) which can be inserted in a large tube and locked into a radially extending cross pipe by adjustable spacer rods and a spring-loaded cone, whereby appropriate cleaning tools can be inserted into the cross pipe for cleaning, inspection, etc. 3 figs.

  4. Manifold tool guide

    DOE Patents [OSTI]

    Djordjevic, Aleksandar

    1983-12-27

    A tool guide that makes possible the insertion of cleaning and/or inspection tools into a manifold pipe that will dislocate and extract the accumulated sediment in such manifold pipes. The tool guide basically comprises a right angled tube (or other angled tube as required) which can be inserted in a large tube and locked into a radially extending cross pipe by adjustable spacer rods and a spring-loaded cone, whereby appropriate cleaning tools can be inserted into to cross pipe for cleaning, inspection, etc.

  5. EE Maximization Tool

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    News & Events Skip navigation links Marketing Resources Reports, Publications, and Research Utility Toolkit Utility Potential Calculator EE Maximization Tool Conduit Utility...

  6. Double diameter boring tool

    DOE Patents [OSTI]

    Ashbaugh, F.A.; Murry, K.R.

    1986-02-10

    A boring tool and a method of operation are provided for boring two concentric holes of precision diameters and depths in a single operation. The boring tool includes an elongated tool body, a shank for attachment to a standard adjustable boring head which is used on a manual or numerical control milling machine and first and second diametrically opposed cutting flutes formed for cutting in opposite directions. The diameter of the elongated tool body is substantially equal to the distance from the first flute tip to the axis of rotation plus the distance from the second flute tip to the axis of rotation. The axis of rotation of the tool is spaced from the tool centerline a distance substantially equal to one-half the distance from the second flute tip to the axis of rotation minus one-half the distance from the first flute tip to the axis of rotation. The method includes the step of inserting the boring tool into the boring head, adjusting the distance between the tool centerline and the tool axis of rotation as described above and boring the two concentric holes.

  7. Double diameter boring tool

    DOE Patents [OSTI]

    Ashbaugh, Fred N.; Murry, Kenneth R.

    1988-12-27

    A boring tool and a method of operation are provided for boring two concentric holes of precision diameters and depths in a single operation. The boring tool includes an elongated tool body, a shank for attachment to a standard adjustable boring head which is used on a manual or numerical control milling machine and first and second diametrically opposed cutting edges formed for cutting in opposite directions. The diameter of the elongated tool body is substantially equal to the distance from the first cutting edge tip to the axis of rotation plus the distance from the second cutting edge tip to the axis of rotation. The axis of rotation of the tool is spaced from the tool centerline a distance substantially equal to one-half the distance from the second cutting edge tip to the axis of rotation minus one-half the distance from the first cutting edge tip to the axis of rotation. The method includes the step of inserting the boring tool into the boring head, adjusting the distance between the tool centerline and the tool axis of rotation as described above and boring the two concentric holes.

  8. Tools for Public Information

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    including Intellus, an online tool that provides transparency and accessibility to the environmental monitoring data from in and around Los Alamos National Laboratory. August 1,...

  9. Strain gauge installation tool

    DOE Patents [OSTI]

    Conard, Lisa Marie

    1998-01-01

    A tool and a method for attaching a strain gauge to a test specimen by maaining alignment of, and applying pressure to, the strain gauge during the bonding of the gauge to the specimen. The tool comprises rigid and compliant pads attached to a spring-loaded clamp. The pads are shaped to conform to the specimen surface to which the gauge is to be bonded. The shape of the pads permits the tool to align itself to the specimen and to maintain alignment of the gauge to the specimen during the bond curing process. A simplified method of attaching a strain gauge is provided by use of the tool.

  10. Demand Response Dispatch Tool

    Energy Science and Technology Software Center (OSTI)

    2012-08-31

    The Demand Response (DR) Dispatch Tool uses price profiles to dispatch demand response resources and create load modifying profiles. These annual profiles are used as inputs to production cost models and regional planning tools (e.g., PROMOD). The tool has been effectively implemented in transmission planning studies conducted by the Western Electricity Coordinating Council via its Transmission Expansion Planning and Policy Committee. The DR Dispatch Tool can properly model the dispatch of DR resources for bothmore » reliability and economic conditions.« less

  11. Manifold tool guide

    DOE Patents [OSTI]

    Djordjevic, A.

    1982-07-08

    A tool guide that makes possible the insertion of cleaning and/or inspection tools into a manifold pipe that will dislocate and extract the accumulated sediment in such manifold pipes. The tool guide basically comprises a right angled tube (or other angled tube as required) which can be inserted in a large tube and locked into a radially extending cross pipe by adjustable spacer rods and a spring-loaded cone, whereby appropriate cleaning tools can be inserted into to cross pipe for cleaning, inspection, etc.

  12. Energy Management Webinar Series

    Broader source: Energy.gov [DOE]

    Boost your knowledge on how to implement an energy management system through this four-part webinar series from the Superior Energy Performance program. Each webinar introduces various elements of the ISO 50001 energy management standard—based on the Plan-Do-Check-Act approach—and the associated steps of DOE's eGuide for ISO 50001 software tool.

  13. Computational Tools to Accelerate Commercial Development

    SciTech Connect (OSTI)

    Miller, David C.

    2013-01-01

    The goals of the work reported are: to develop new computational tools and models to enable industry to more rapidly develop and deploy new advanced energy technologies; to demonstrate the capabilities of the CCSI Toolset on non-proprietary case studies; and to deploy the CCSI Toolset to industry. Challenges of simulating carbon capture (and other) processes include: dealing with multiple scales (particle, device, and whole process scales); integration across scales; verification, validation, and uncertainty; and decision support. The tools cover: risk analysis and decision making; validated, high-fidelity CFD; high-resolution filtered sub-models; process design and optimization tools; advanced process control and dynamics; process models; basic data sub-models; and cross-cutting integration tools.

  14. Time and Resource Estimation Tool

    Energy Science and Technology Software Center (OSTI)

    2004-06-08

    RESTORE is a computer software tool that allows one to model a complex set of steps required to accomplish a goal (e.g., repair a ruptured natural gas pipeline and restore service to customers). However, the time necessary to complete step may be uncertain and may be affected by conditions, such as the weather, the time of day, the day of the week. Therefore, "nature" can influence which steps are taken and the time needed tomore » complete each step. In addition, the tool allows one to model the costs for each step, which also may be uncertain. RESTORE allows the user to estimate the time and cost, both of which may be uncertain, to achieve an intermediate stage of completion, as well as overall completion. The software also makes it possible to model parallel, competing groups of activities (i.e., parallel paths) so that progreSs at a ‘merge point’ can proceed before other competing activities are completed. For example, RESTORE permits one to model a workaround and a simultaneous complete repair to determine a probability distribution for the earliest time service can be restored to a critical customer. The tool identifies the ‘most active path’ through the network of tasks, which is extremely important information for assessing the most effective way to speed-up or slow-down progress. Unlike other project planning and risk analysis tools, RESTORE provides an intuitive, graphical, and object-oriented environment for structuring a model and setting its parameters.« less

  15. Risk communication in environmental assessment

    SciTech Connect (OSTI)

    Rahm-Crites, L.

    1996-08-26

    Since the enactment of NEPA and other environmental legislation, the concept of `risk communication` has expanded from simply providing citizens with scientific information about risk to exploring ways of making risk information genuinely meaningful to the public and facilitating public involvement in the very processes whereby risk is analyzed and managed. Contemporary risk communication efforts attempt to find more effective ways of conveying increasingly complex risk information and to develop more democratic and proactive approaches to community involvement, in particular to ensuring the participation of diverse populations in risk decisions. Although considerable progress has been made in a relatively short time, risk communication researchers and practitioners currently face a number of challenges in a time of high expectations, low trust, and low budgets.

  16. Development of Methodologies for Technology Deployment for Advanced Outage Control Centers that Improve Outage Coordination, Problem Resolution and Outage Risk Management

    SciTech Connect (OSTI)

    Shawn St. Germain; Ronald Farris; Heather Medeman

    2013-09-01

    This research effort is a part of the Light-Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by Department of Energy (DOE) and performed in close collaboration with industry R&D programs that provides the technical foundations for licensing and managing the long-term, safe, and economical operation of current nuclear power plants. The LWRS program serves to help the U.S. nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. The long term viability of existing nuclear power plants in the U.S. will depend upon maintaining high capacity factors, avoiding nuclear safety issues and reducing operating costs. The slow progress in the construction on new nuclear power plants has placed in increased importance on maintaining the output of the current fleet of nuclear power plants. Recently expanded natural gas production has placed increased economic pressure on nuclear power plants due to lower cost competition. Until recently, power uprate projects had steadily increased the total output of the U.S. nuclear fleet. Errors made during power plant upgrade projects have now removed three nuclear power plants from the U.S. fleet and economic considerations have caused the permanent shutdown of a fourth plant. Additionally, several utilities have cancelled power uprate projects citing economic concerns. For the past several years net electrical generation from U.S. nuclear power plants has been declining. One of few remaining areas where significant improvements in plant capacity factors can be made is in minimizing the duration of refueling outages. Managing nuclear power plant outages is a complex and difficult task. Due to the large number of complex tasks and the uncertainty that accompanies them, outage durations routinely exceed the planned duration. The ability to complete an outage on or near schedule depends upon the performance of the outage management organization. During an outage, the outage control center (OCC) is the temporary command center for outage managers and provides several critical functions for the successful execution of the outage schedule. Essentially, the OCC functions to facilitate information inflow, assist outage management in processing information and to facilitate the dissemination of information to stakeholders. Currently, outage management activities primarily rely on telephone communication, face to face reports of status and periodic briefings in the OCC. Much of the information displayed in OCCs is static and out of date requiring an evaluation to determine if it is still valid. Several advanced communication and collaboration technologies have shown promise for facilitating the information flow into, across and out of the OCC. Additionally, advances in the areas of mobile worker technologies, computer based procedures and electronic work packages can be leveraged to improve the availability of real time status to outage managers.

  17. Fluid sampling tool

    DOE Patents [OSTI]

    Johnston, Roger G.; Garcia, Anthony R. E.; Martinez, Ronald K.

    2001-09-25

    The invention includes a rotatable tool for collecting fluid through the wall of a container. The tool includes a fluid collection section with a cylindrical shank having an end portion for drilling a hole in the container wall when the tool is rotated, and a threaded portion for tapping the hole in the container wall. A passageway in the shank in communication with at least one radial inlet hole in the drilling end and an opening at the end of the shank is adapted to receive fluid from the container. The tool also includes a cylindrical chamber affixed to the end of the shank opposite to the drilling portion thereof for receiving and storing fluid passing through the passageway. The tool also includes a flexible, deformable gasket that provides a fluid-tight chamber to confine kerf generated during the drilling and tapping of the hole. The invention also includes a fluid extractor section for extracting fluid samples from the fluid collecting section.

  18. OOTW Force Design Tools

    SciTech Connect (OSTI)

    Bell, R.E.; Hartley, D.S.III; Packard, S.L.

    1999-05-01

    This report documents refined requirements for tools to aid the process of force design in Operations Other Than War (OOTWs). It recommends actions for the creation of one tool and work on other tools relating to mission planning. It also identifies the governmental agencies and commands with interests in each tool, from whom should come the user advisory groups overseeing the respective tool development activities. The understanding of OOTWs and their analytical support requirements has matured to the point where action can be taken in three areas: force design, collaborative analysis, and impact analysis. While the nature of the action and the length of time before complete results can be expected depends on the area, in each case the action should begin immediately. Force design for OOTWs is not a technically difficult process. Like force design for combat operations, it is a process of matching the capabilities of forces against the specified and implied tasks of the operation, considering the constraints of logistics, transport and force availabilities. However, there is a critical difference that restricts the usefulness of combat force design tools for OOTWs: the combat tools are built to infer non-combat capability requirements from combat capability requirements and cannot reverse the direction of the inference, as is required for OOTWs. Recently, OOTWs have played a larger role in force assessment, system effectiveness and tradeoff analysis, and concept and doctrine development and analysis. In the first Quadrennial Defense Review (QDR), each of the Services created its own OOTW force design tool. Unfortunately, the tools address different parts of the problem and do not coordinate the use of competing capabilities. These tools satisfied the immediate requirements of the QDR, but do not provide a long-term cost-effective solution.

  19. RAPID MAPPING TOOL: AN ARCMAP EXTENSION

    SciTech Connect (OSTI)

    STEVE P. LINGER; PAUL M. RICH; DOUG WALTHER; MARC S. WITKOWSKI; MARCIA A. JONES; HARI S. KHALSA

    2002-06-18

    Cartographic production laboratories produce large volumes of maps for diverse customers. Turnaround time and consistency are key concerns. The Rapid Mapping Tool is an ArcMap based tool that enables rapid creation of maps to meet customer needs. This tool was constructed using VB/VBA, ArcObjects, and ArcGIS templates. The core capability of ArcMap is extended for custom map production by storing specifications associated with a map or template in a companion XML document. These specifications include settings and preferences used to create custom maps. The tool was developed as a component of an enterprise GIS, which enables spatial data management and delivery using ArcSDE, ArcIMS, Oracle, and a web-based request tracking system.

  20. Reduce Risk, Increase Clean Energy: How States and Cities are...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    How States and Cities are Using Old Finance Tools to Scale Up a New Industry Reduce Risk, Increase Clean Energy: How States and Cities are Using Old Finance Tools to Scale Up a New ...

  1. Eclipse Parallel Tools Platform

    Energy Science and Technology Software Center (OSTI)

    2005-02-18

    Designing and developing parallel programs is an inherently complex task. Developers must choose from the many parallel architectures and programming paradigms that are available, and face a plethora of tools that are required to execute, debug, and analyze parallel programs i these environments. Few, if any, of these tools provide any degree of integration, or indeed any commonality in their user interfaces at all. This further complicates the parallel developer's task, hampering software engineering practices,more » and ultimately reducing productivity. One consequence of this complexity is that best practice in parallel application development has not advanced to the same degree as more traditional programming methodologies. The result is that there is currently no open-source, industry-strength platform that provides a highly integrated environment specifically designed for parallel application development. Eclipse is a universal tool-hosting platform that is designed to providing a robust, full-featured, commercial-quality, industry platform for the development of highly integrated tools. It provides a wide range of core services for tool integration that allow tool producers to concentrate on their tool technology rather than on platform specific issues. The Eclipse Integrated Development Environment is an open-source project that is supported by over 70 organizations, including IBM, Intel and HP. The Eclipse Parallel Tools Platform (PTP) plug-in extends the Eclipse framwork by providing support for a rich set of parallel programming languages and paradigms, and a core infrastructure for the integration of a wide variety of parallel tools. The first version of the PTP is a prototype that only provides minimal functionality for parallel tool integration of a wide variety of parallel tools. The first version of the PTP is a prototype that only provides minimal functionality for parallel tool integration, support for a small number of parallel architectures, and basis Fortran integration. Future versions will extend the functionality substantially, provide a number of core parallel tools, and provide support across a wide rang of parallel architectures and languages.« less

  2. Risk Analysis

    Broader source: Energy.gov [DOE]

    Almost any new technology involves some risk. Risks involved in working with hydrogen can be minimized through adherence to standard design parameters for equipment and procedures. The Fuel Cell...

  3. A risk-based focused decision-management approach for justifying characterization of Hanford tank waste. June 1996, Revision 1; April 1997, Revision 2

    SciTech Connect (OSTI)

    Colson, S.D.; Gephart, R.E.; Hunter, V.L.; Janata, J.; Morgan, L.G.

    1997-12-31

    This report describes a disciplined, risk-based decision-making approach for determining characterization needs and resolving safety issues during the storage and remediation of radioactive waste stored in Hanford tanks. The strategy recommended uses interactive problem evaluation and decision analysis methods commonly used in industry to solve problems under conditions of uncertainty (i.e., lack of perfect knowledge). It acknowledges that problem resolution comes through both the application of high-quality science and human decisions based upon preferences and sometimes hard-to-compare choices. It recognizes that to firmly resolve a safety problem, the controlling waste characteristics and chemical phenomena must be measurable or estimated to an acceptable level of confidence tailored to the decision being made.

  4. Engineer Russ Feder leads development of diagnostic tools for...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Engineer Russ Feder leads development of diagnostic tools for US ITER as physicist Dave ... In a rare transition, engineer Russ Feder has stepped into a management job that a ...

  5. Graphitic packing removal tool

    DOE Patents [OSTI]

    Meyers, Kurt Edward; Kolsun, George J.

    1997-01-01

    Graphitic packing removal tools for removal of the seal rings in one piece. he packing removal tool has a cylindrical base ring the same size as the packing ring with a surface finish, perforations, knurling or threads for adhesion to the seal ring. Elongated leg shanks are mounted axially along the circumferential center. A slit or slits permit insertion around shafts. A removal tool follower stabilizes the upper portion of the legs to allow a spanner wrench to be used for insertion and removal.

  6. Graphitic packing removal tool

    DOE Patents [OSTI]

    Meyers, K.E.; Kolsun, G.J.

    1997-11-11

    Graphitic packing removal tools for removal of the seal rings in one piece are disclosed. The packing removal tool has a cylindrical base ring the same size as the packing ring with a surface finish, perforations, knurling or threads for adhesion to the seal ring. Elongated leg shanks are mounted axially along the circumferential center. A slit or slits permit insertion around shafts. A removal tool follower stabilizes the upper portion of the legs to allow a spanner wrench to be used for insertion and removal. 5 figs.

  7. Biosafety Risk Assessment Model

    Energy Science and Technology Software Center (OSTI)

    2011-05-27

    Software tool based on a structured methodology for conducting laboratory biosafety risk assessments by biosafety experts. Software is based upon an MCDA scheme and uses peer reviewed criteria and weights. The software was developed upon Microsoft’s .net framework. The methodology defines likelihood and consequence of a laboratory exposure for thirteen unique scenarios and provides numerical relative risks for each of the relevant thirteen. The software produces 2-d graphs reflecting the relative risk and a sensitivitymore » analysis which highlights the overall importance of each factor. The software works as a set of questions with absolute scales and uses a weighted additive model to calculate the likelihood and consequence.« less

  8. Initial Decision and Risk Analysis

    SciTech Connect (OSTI)

    Engel, David W.

    2012-02-29

    Decision and Risk Analysis capabilities will be developed for industry consideration and possible adoption within Year 1. These tools will provide a methodology for merging qualitative ranking of technology maturity and acknowledged risk contributors with quantitative metrics that drive investment decision processes. Methods and tools will be initially introduced as applications to the A650.1 case study, but modular spreadsheets and analysis routines will be offered to industry collaborators as soon as possible to stimulate user feedback and co-development opportunities.

  9. Strain gauge installation tool

    DOE Patents [OSTI]

    Conard, L.M.

    1998-06-16

    A tool and a method are disclosed for attaching a strain gauge to a test specimen by maintaining alignment of, and applying pressure to, the strain gauge during the bonding of the gauge to the specimen. The tool comprises rigid and compliant pads attached to a spring-loaded clamp. The pads are shaped to conform to the specimen surface to which the gauge is to be bonded. The shape of the pads permits the tool to align itself to the specimen and to maintain alignment of the gauge to the specimen during the bond curing process. A simplified method of attaching a strain gauge is provided by use of the tool. 6 figs.

  10. Smart tool holder

    DOE Patents [OSTI]

    Day, Robert Dean; Foreman, Larry R.; Hatch, Douglas J.; Meadows, Mark S.

    1998-01-01

    There is provided an apparatus for machining surfaces to accuracies within the nanometer range by use of electrical current flow through the contact of the cutting tool with the workpiece as a feedback signal to control depth of cut.

  11. UNIX Public Tools

    Broader source: Energy.gov [DOE]

    SATAN, the System Administrator Tool for Analyzing Networks, is a network security analyzer designed by Dan Farmer and Wietse Venema. SATAN scans systems connected to the network noting the...

  12. Friction stir welding tool

    DOE Patents [OSTI]

    Tolle; Charles R. , Clark; Denis E. , Barnes; Timothy A.

    2008-04-15

    A friction stir welding tool is described and which includes a shank portion; a shoulder portion which is releasably engageable with the shank portion; and a pin which is releasably engageable with the shoulder portion.

  13. Lustre Monitoring Tools

    Energy Science and Technology Software Center (OSTI)

    2007-05-05

    The Lustre Monitoring Tools software package is a set of utilities developed to facilitate real-time and historical monitoring of the performance of a Lustre FileSystem.

  14. Safety Walkthrough Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Walkthrough Management

  15. Tools for Public Information

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy Tools for Discovery Offer Potential Hope for Huntington's Tools for Discovery Offer Potential Hope for Huntington's May 25, 2011 - 3:24pm Addthis Flora Meilleur prepares protein solutions for structural investigation with neutrons. | Courtesy of ORNL Flickr / Jason Richards Flora Meilleur prepares protein solutions for structural investigation with neutrons. | Courtesy of ORNL Flickr / Jason Richards Charles Rousseaux Charles Rousseaux Senior Communications Specialist (detailee) What

  16. Device Simulation Tool - JCAP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PAZ0036_v2.jpg Device Simulation Tool Research Why Solar Fuels Goals & Objectives Thrust 1 Thrust 2 Thrust 3 Thrust 4 Publications Research Highlights Videos Innovations User Facilities Expert Team Benchmarking Database Device Simulation Tool XPS Spectral Database Research Introduction Why Solar Fuels? Goals & Objectives Thrusts Thrust 1 Thrust 2 Thrust 3 Thrust 4 Library Publications Research Highlights Videos Resources User Facilities Expert Team Benchmarking Database Device Simulation

  17. ORISE: Training and Tools

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Training and Tools Chronic diseases such as diabetes, heart disease and cancer afflict more people every year and have resulted in increased demand for trained health care providers and accessible health information. Because health care workers and the public are becoming more technology savvy, e-learning or computer-based training experiences that are visually interesting and interactive are increasingly desirable. Computer and Web-based learning tools offer a cost-effective and flexible

  18. Velo: Knowledge and Tool

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Velo: Knowledge and Tool Integration for Collaborative Scientific Projects Carina Lansing, Kerstin Kleese van Dam 1 Scientific Project Life Cycle 2 Conceptual Modeling Simulation Execution Visualization & Analytics Data Input Data Uncertainty Quantification Validation, Diagnostics, & Monitoring Reference Data / Data Mining Challenges to Scientists ! Has someone done something similar before? Is there a good example? ! How do I find the information I need? ! What are the best tools to

  19. FEMP Launches New Training Search Tool | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Search Tool FEMP Launches New Training Search Tool November 18, 2014 - 4:58pm Addthis The Federal Energy Management Program (FEMP) recently launched the FEMP Training Search, a Web tool that lists free training opportunities to help agencies meet Federal energy, water, and sustainability laws and requirements. The new user-centered FEMP Training Search provides additional options to easily find and select training offerings by topic area, topic series, course format and type, and by level of

  20. Commercial Building Energy Asset Rating Tool User's Guide

    SciTech Connect (OSTI)

    Wang, Na; Makhmalbaf, Atefe; Matsumoto, Steven W.

    2012-05-01

    The U.S. Department of Energy’s Commercial Building Energy Asset Rating Tool is a web-based system that is designed to allow building owners, managers, and operators to more accurately assess the energy performance of their commercial buildings. This document provide a step-by-step instruction on how to use the tool.

  1. Metadata staging tools

    Energy Science and Technology Software Center (OSTI)

    2013-08-01

    Django application providing a user-interface for building a file and metadata management system. Operates in conjunction with https://github.com/usgin/metadata-server.

  2. Management Alert: OAS-RA-12-01 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Specifically, Western had not initially required MATL to establish an earned value management system and a risk-based management reserve. Without an earned value management system, ...

  3. The Role Risk Assessments Have Played in Proposed CERCLA Decision Documents

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Risk Assessments in Proposed CERCLA Decision Documents for Hanford River Corridor Larry Gadbois - EPA Presentation to the Hanford Advisory Board April 12, 2012 Risk Assessments in CERCLA * Assess risk * Establish the basis for action * Identify risks that need to be mitigated * One of the tools used to establish cleanup levels Waste Site or Groundwater contamination information Risk Assessment What is the risk? Is risk within acceptable limits? Risk Assessment: assess risk establish basis for

  4. Quantifiably secure power grid operation, management, and evolution : a study of uncertainties affecting the grid integration of renewables.

    SciTech Connect (OSTI)

    Gray, Genetha Anne; Watson, Jean-Paul; Silva Monroy, Cesar Augusto; Gramacy, Robert B.

    2013-09-01

    This report summarizes findings and results of the Quantifiably Secure Power Grid Operation, Management, and Evolution LDRD. The focus of the LDRD was to develop decisionsupport technologies to enable rational and quantifiable risk management for two key grid operational timescales: scheduling (day-ahead) and planning (month-to-year-ahead). Risk or resiliency metrics are foundational in this effort. The 2003 Northeast Blackout investigative report stressed the criticality of enforceable metrics for system resiliency - the grid's ability to satisfy demands subject to perturbation. However, we neither have well-defined risk metrics for addressing the pervasive uncertainties in a renewable energy era, nor decision-support tools for their enforcement, which severely impacts efforts to rationally improve grid security. For day-ahead unit commitment, decision-support tools must account for topological security constraints, loss-of-load (economic) costs, and supply and demand variability - especially given high renewables penetration. For long-term planning, transmission and generation expansion must ensure realized demand is satisfied for various projected technological, climate, and growth scenarios. The decision-support tools investigated in this project paid particular attention to tailoriented risk metrics for explicitly addressing high-consequence events. Historically, decisionsupport tools for the grid consider expected cost minimization, largely ignoring risk and instead penalizing loss-of-load through artificial parameters. The technical focus of this work was the development of scalable solvers for enforcing risk metrics. Advanced stochastic programming solvers were developed to address generation and transmission expansion and unit commitment, minimizing cost subject to pre-specified risk thresholds. Particular attention was paid to renewables where security critically depends on production and demand prediction accuracy. To address this concern, powerful filtering techniques for spatio-temporal measurement assimilation were used to develop short-term predictive stochastic models. To achieve uncertaintytolerant solutions, very large numbers of scenarios must be simultaneously considered. One focus of this work was investigating ways of reasonably reducing this number.

  5. ENERGY STAR Webinar: Portfolio Manager 101

    Broader source: Energy.gov [DOE]

    Hosted by the U.S. Environmental Protection Agency's (EPA's) ENERGY STAR, this webinar will introduce and demonstrate the EPA's ENERGY STAR Portfolio Manager tool.

  6. Program Management Initiative | Department of Energy

    Office of Environmental Management (EM)

    disciplined systems and processes, highly motivated and capable professionals, useful tools and job aids, and a management approach that emphasizes results. To achieve...

  7. Integrated Safety Management- Building Mission Success

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    In 1996, the Department of Energy committed to the Integrated Safety Management System (ISMS) as a tool for DOE and ... maintenance around your home, YOU are ultimately ...

  8. Career Map: Finance Manager | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Math skills. Financial managers must be skilled in math, including algebra. An understanding of finance tools, markets and complex financial documents is also is important. ...

  9. Fermilab | Directorate | Office of Project Management Oversight...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    We work with project teams to establish standard project management processes, tools and training designed to both maximize project success and comply with DOE and Fermilab rules ...

  10. A Multiple Objective Decision Support Tool (MODS)

    Energy Science and Technology Software Center (OSTI)

    2003-12-14

    The Multiple Objective Decision Support (MODS) tool is an automated tool used to assist decision makers and policy analysts with multiple-objective decision problems. The classes of problems that this decision support tool addresses have both multiple objectives and multiple stakeholders. Decision problems, which have multiple objectives that in general cannot be maximized simultaneously, and multiple stakeholders, who have different perspectives about the relative importance of the objectives, require analytic approaches and tools that can providemore » flexible support to decision makers. This tool provides capabilities for the management, analysis, and graphical display for these types of decision problems drawn from diverse problem domains. The MODS tool is a unique integration of analysis algorithms, an information database, and a graphical user interface. This collection of algorithms, the combination of an information database with the analysis into a single tool, and the graphical user interface provides a technically advanced tool to decision makers and policy analysts. There are two main issues when addressing problems of this type: what set of attributes should be used to characterize the tokens in the domain of interest, and how should the values of these attributes and their weights be determined and combined to provide a relative ordering to the tokens. This tool addresses both of these issues. This decision support tool provides a flexible way to derive and use a chosen set of attributes. For example, the tool could be used to first perform a paired comparison of a large set of attributes and from this evaluation select those attributes that have the highest weights. The flexibility of the tool allows experimentation with various attribute sets and this capability, along with domain expertise, addresses the first issue. To address the second issue, several algorithms have been implemented. For example, two algorithms that have been implemented are the geometric mean and the product of the weighted attributes. These, and other algorithms, are described in detail in the following sections. The algorithms can be selected easily and various evaluations can be compared. The tool also provides flexible methods for assigning weights to the attributes. A range of values can be assigned to an attribute when there is uncertainty as to which specific value should be assigned.« less

  11. Program & Project Management For The Acquisition Of Capital Assets

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    How Will We Define Success? * Project Success: (For Capital Asset Projects) - Project ... Management for the Acquisition of Capital Assets DOE G 413.3-7, Risk Management ...

  12. Manipulative Virtual Tools for Tool Mark Characterization | The...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Manipulative Virtual Tools for Tool Mark Characterization FWPProject Description: The goal of this project is to develop a methodology whereby a three-dimensional (3-D) computer...

  13. Manipulative Virtual Tools for Tool Mark Characterization | The...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Manipulative Virtual Tools for Tool Mark Characterization DESCRIPTION: The goal of this project is to develop a methodology whereby a three-dimensional (3-D) computer simulation of...

  14. Asset Revitalization Guide for Asset Management and Reuse

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-07-16

    Pursuant to the objectives of the Order, the “Asset Revitalization (AR) Guide for Asset Management and Reuse” (AR Guide) was developed to assist DOE and NNSA sites and program offices offer unneeded assets with remaining capacity to the public or other government agencies. DOE continually refines strategies and tools, enabling it to share unique assets, including land, facilities, infrastructure, equipment, and technologies with the public. Real property planning, acquisition, sustainment, and disposal decisions are balanced to accomplish DOE’s mission; reduce risks to workers, the public, and the environment; and minimize lifecycle costs. Does not cancel/supersede other directives.

  15. EPA ENERGY STAR Webcast- Portfolio Manager 101

    Broader source: Energy.gov [DOE]

    Join us as we introduce and demonstrate the core functionality of EPA’s new ENERGY STAR Portfolio Manager tool. Attendees will learn how to: navigate the new Portfolio Manager; add a property and...

  16. ENERGY STAR Webinar: Portfolio Manager 101

    Broader source: Energy.gov [DOE]

    Join us as we introduce and demonstrate the core functionality of EPA’s new ENERGY STAR Portfolio Manager tool. Attendees will learn how to: navigate the new Portfolio Manager; add a property and...

  17. EPA ENERGY STAR Webcast: Portfolio Manager 101

    Broader source: Energy.gov [DOE]

    Join us as we introduce and demonstrate the core functionality of EPAs new ENERGY STAR Portfolio Manager tool. Attendees will learn how to: navigate the new Portfolio Manager; add a property and...

  18. EPA ENERGY STAR Webcast- Portfolio Manager 201

    Broader source: Energy.gov [DOE]

    Continue to learn about EPA’s new ENERGY STAR Portfolio Manager tool, with a deeper dive into more advanced functionalities such as: managing and tracking changes to your property uses over time;...

  19. EPA ENERGY STAR Webcast: Portfolio Manager 201

    Broader source: Energy.gov [DOE]

    Continue to learn about EPA’s new ENERGY STAR Portfolio Manager tool, with a deeper dive into more advanced functionalities such as: managing and tracking changes to your property uses over time;...

  20. ENERGY STAR Webinar: Portfolio Manager 201

    Broader source: Energy.gov [DOE]

    This webinar continues on the U.S. Environmental Protection Agency's (EPA's) new ENERGY STAR Portfolio Manager tool. Attendees will learn the more advanced functionalities, such as managing and...

  1. EPA ENERGY STAR Webcast: Portfolio Manager 101

    Broader source: Energy.gov [DOE]

    Join us as we introduce and demonstrate the core functionality of EPA’s new ENERGY STAR Portfolio Manager tool. Attendees will learn how to: navigate the new Portfolio Manager; add a property and...

  2. EPA ENERGY STAR Webcast: Portfolio Manager 201

    Broader source: Energy.gov [DOE]

    Continue to learn about EPAs new ENERGY STAR Portfolio Manager tool, with a deeper dive into more advanced functionalities such as: managing and tracking changes to your property uses over time;...

  3. Software Tools | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Software Tools Software Tools AMO's tools help manufacturers increase industrial energy efficiency at the plant-level and in specific systems. Learn step-by-step ways to identify ...

  4. mirabootcamp-tools-2014.pptx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BGQ Performance Tools Sco P arker Mira P erformance B oot C amp: M ay 2 1, 2 014 Argonne L eadership C ompuBng F acility Mira Tools Status Tool N ame Source Provides Q S tatus...

  5. QuickPEP Tool Demonstration

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... QuickPEP Tool Demonstration SSSTSSAT PHAST N X EAT MotorMaster+ AirMaster+ PSAT 3E+ CHP Tool FSAT QuickPEP Tool Results Identify Energy Savings Opportunities By System Establish ...

  6. Probabilistic Risk Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Risk Assessment - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management Programs Advanced Nuclear

  7. Security Risk Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Security Risk Assessment - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management Programs Advanced

  8. RSP Tooling Technology

    SciTech Connect (OSTI)

    2001-11-20

    RSP Tooling{trademark} is a spray forming technology tailored for producing molds and dies. The approach combines rapid solidification processing and net-shape materials processing in a single step. The general concept involves converting a mold design described by a CAD file to a tooling master using a suitable rapid prototyping (RP) technology such as stereolithography. A pattern transfer is made to a castable ceramic, typically alumina or fused silica (Figure 1). This is followed by spray forming a thick deposit of a tooling alloy on the pattern to capture the desired shape, surface texture, and detail. The resultant metal block is cooled to room temperature and separated from the pattern. The deposit's exterior walls are machined square, allowing it to be used as an insert in a standard mold base. The overall turnaround time for tooling is about 3 to 5 days, starting with a master. Molds and dies produced in this way have been used in high volume production runs in plastic injection molding and die casting. A Cooperative Research and Development Agreement (CRADA) between the Idaho National Engineering and Environmental Laboratory (INEEL) and Grupo Vitro has been established to evaluate the feasibility of using RSP Tooling technology for producing molds and dies of interest to Vitro. This report summarizes results from Phase I of this agreement, and describes work scope and budget for Phase I1 activities. The main objective in Phase I was to demonstrate the feasibility of applying the Rapid Solidification Process (RSP) Tooling method to produce molds for the manufacture of glass and other components of interest to Vitro. This objective was successfully achieved.

  9. The GNEMRE Dendro Tool.

    SciTech Connect (OSTI)

    Merchant, Bion John

    2007-10-01

    The GNEMRE Dendro Tool provides a previously unrealized analysis capability in the field of nuclear explosion monitoring. Dendro Tool allows analysts to quickly and easily determine the similarity between seismic events using the waveform time-series for each of the events to compute cross-correlation values. Events can then be categorized into clusters of similar events. This analysis technique can be used to characterize historical archives of seismic events in order to determine many of the unique sources that are present. In addition, the source of any new events can be quickly identified simply by comparing the new event to the historical set.

  10. Fenestration Software Tools

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    dccurcija@lbl.gov Lawrence Berkeley National Laboratory Fenestration Software Tools 2014 Building Technologies Office Peer Review 2 Project Summary Timeline: Start date: 10/1/2013 (longer term effort through different projects in the past) Planned end date: 9/30/2018 Key Milestones 1. Released version of the next generation of fenestration software tools 2. Addition of full set of models for cellular shades and pleated shades Budget: Total DOE $ to date: $265k Total future DOE $: $2,000k Key

  11. Drum lid removal tool

    DOE Patents [OSTI]

    Pella, Bernard M.; Smith, Philip D.

    2010-08-24

    A tool for removing the lid of a metal drum wherein the lid is clamped over the drum rim without protruding edges, the tool having an elongated handle with a blade carried by an angularly positioned holder affixed to the midsection of the handle, the blade being of selected width to slice between lid lip and the drum rim and, when the blade is so positioned, upward motion of the blade handle will cause the blade to pry the lip from the rim and allow the lid to be removed.

  12. ARM - Data Tools

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    govData Tools Data Tools Software for Working with ARM NetCDF Data Most ARM data are archived and made available as time-series data in netCDF format. NetCDF (designed by Unidata) is relatively compact, appendable, capable of storing descriptive "metadata" along with measurement data, and is platform-independent. Resources for assisting with the reading, writing, displaying, and manipulation of ARM NetCDF data are available on this page. Learning About netCDF and Obtaining netCDF

  13. Grid Client Tools

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Client Tools Grid Client Tools Using OSG and Globus client software You can either run the OSG/Globus client software directly on the NERSC systems via "modules" or by downloading it to your workstation. On your workstation: Download and install the OSG client software. Then run the following to setup your environment: % . $INSTALL_DIR/setup.sh or % source $INSTALL_DIR/setup.csh On NERSC Compute Systems: Use the module command to load the OSG or Globus toolkit. Where possible, you

  14. PCard Data Analysis Tool

    Energy Science and Technology Software Center (OSTI)

    2005-04-01

    The Procurement Card data analysis and monitoring tool enables due-diligence review using predefined user-created queries and reports. The system tracks individual compliance emails. More specifically, the tool: - Helps identify exceptions or questionable and non-compliant purchases, - Creates audit random sample on request, - Allows users to create and run new or ad-hoc queries and reports, - Monitors disputed charges, - Creates predefined Emails to Cardholders requesting documentation and/or clarification, - Tracks audit status, notes,more » Email status (date sent, response), audit resolution.« less

  15. Software and Tools

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tools Software and Tools Chos Chos is used to select your operating system at PDSF. Read More » Modules Module is a system which you can use to specify what software you want to use... Read More » Project Accounts You can use a shared project account to facilitate collaboration... Read More » Checking Quotas To check your quotas use the myquota command... Read More » Accelerating Remote X Performance You can use NX to greatly improve the performance of X window applications. Read More »

  16. Energy efficiency assessment methods and tools evaluation

    SciTech Connect (OSTI)

    McMordie, K.L.; Richman, E.E.; Keller, J.M.; Dixon, D.R.

    1994-08-01

    Many different methods of assessing the energy savings potential at federal installations, and identifying attractive projects for capital investment have been used by the different federal agencies. These methods range from high-level estimating tools to detailed design tools, both manual and software assisted. These methods have different purposes and provide results that are used for different parts of the project identification, and implementation process. Seven different assessment methods are evaluated in this study. These methods were selected by the program managers at the DoD Energy Policy Office, and DOE Federal Energy Management Program (FEMP). Each of the methods was applied to similar buildings at Bolling Air Force Base (AFB), unless it was inappropriate or the method was designed to make an installation-wide analysis, rather than focusing on particular buildings. Staff at Bolling AFB controlled the collection of data.

  17. CLEAP_Tools_DRAFT_nameupdate

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Zoning Check Climate Explorer Smart Location Database Coastal Resilience Mapping Tool ... Cost of renewable energy spreadsheet tool JEDI Open PV Database OpenEI Datasets BEDES ...

  18. Risk assessment handbook

    SciTech Connect (OSTI)

    Farmer, F.G.; Jones, J.L.; Hunt, R.N.; Roush, M.L.; Wierman, T.E.

    1990-09-01

    The Probabilistic Risk Assessment Unit at EG G Idaho has developed this handbook to provide guidance to a facility manager exploring the potential benefit to be gained by performance of a risk assessment properly scoped to meet local needs. This document is designed to help the manager control the resources expended commensurate with the risks being managed and to assure that the products can be used programmatically to support future needs in order to derive maximum beneflt from the resources expended. We present a logical and functional mapping scheme between several discrete phases of project definition to ensure that a potential customer, working with an analyst, is able to define the areas of interest and that appropriate methods are employed in the analysis. In addition the handbook is written to provide a high-level perspective for the analyst. Previously, the needed information was either scattered or existed only in the minds of experienced analysts. By compiling this information and exploring the breadth of knowledge which exists within the members of the PRA Unit, the functional relationships between the customers' needs and the product have been established.

  19. Risk assessment handbook

    SciTech Connect (OSTI)

    Farmer, F.G.; Jones, J.L.; Hunt, R.N.; Roush, M.L.; Wierman, T.E.

    1990-09-01

    The Probabilistic Risk Assessment Unit at EG&G Idaho has developed this handbook to provide guidance to a facility manager exploring the potential benefit to be gained by performance of a risk assessment properly scoped to meet local needs. This document is designed to help the manager control the resources expended commensurate with the risks being managed and to assure that the products can be used programmatically to support future needs in order to derive maximum beneflt from the resources expended. We present a logical and functional mapping scheme between several discrete phases of project definition to ensure that a potential customer, working with an analyst, is able to define the areas of interest and that appropriate methods are employed in the analysis. In addition the handbook is written to provide a high-level perspective for the analyst. Previously, the needed information was either scattered or existed only in the minds of experienced analysts. By compiling this information and exploring the breadth of knowledge which exists within the members of the PRA Unit, the functional relationships between the customers` needs and the product have been established.

  20. Electrically powered hand tool

    DOE Patents [OSTI]

    Myers, Kurt S.; Reed, Teddy R.

    2007-01-16

    An electrically powered hand tool is described and which includes a three phase electrical motor having a plurality of poles; an electrical motor drive electrically coupled with the three phase electrical motor; and a source of electrical power which is converted to greater than about 208 volts three-phase and which is electrically coupled with the electrical motor drive.

  1. Clean Cities Tools

    SciTech Connect (OSTI)

    2014-12-19

    The U.S. Department of Energy's Clean Cities offers a large collection of Web-based tools on the Alternative Fuels Data Center. These calculators, interactive maps, and data searches can assist fleets, fuels providers, and other transportation decision makers in their efforts to reduce petroleum use.

  2. Chizu Task Mapping Tool

    Energy Science and Technology Software Center (OSTI)

    2014-07-01

    Chizu is a tool for Mapping MPI processes or tasks to physical processors or nodes for optimizing communication performance. It takes the communication graph of a High Performance Computing (HPC) application and the interconnection topology of a supercomputer as input. It outputs a new MPI rand to processor mapping, which can be used when launching the HPC application.

  3. Smart tool holder

    DOE Patents [OSTI]

    Day, R.D.; Foreman, L.R.; Hatch, D.J.; Meadows, M.S.

    1998-09-08

    There is provided an apparatus for machining surfaces to accuracies within the nanometer range by use of electrical current flow through the contact of the cutting tool with the workpiece as a feedback signal to control depth of cut. 3 figs.

  4. Frequency Response Tool

    Energy Science and Technology Software Center (OSTI)

    2014-03-13

    According to the North American Electric Reliability Corporation (NERC) definition: “Frequency response is a measure of an Interconnection’s ability to stabilize frequency immediately following the sudden loss of generation or load, and is a critical component of the reliable operation of the Bulk-Power System, particularly during disturbances and recoveries. Failure to maintain frequency can disrupt the operation of equipment and initiate disconnection of power plant equipment to prevent it from being damaged, which could leadmore » to wide-spread blackouts.” Frequency Response Tool automates the power system frequency response analysis process. The tool performs initial estimation of the system frequency parameters (initial frequency, minimum frequency, settling point). User can visually inspect and adjust these parameters. The tool also calculates the frequency response performance metrics of the system, archives the historic events and baselines the system performance. Frequency response performance characteristics of the system are calculated using phasor measurement unit (PMU) information. Methodology of the frequency response performance assessment implemented in the tool complies with the NERC Frequency response standard.« less

  5. Energy Footprint Tool

    Broader source: Energy.gov [DOE]

    Developed by the U.S. Department of Energy, the Energy Footprint Tool can help manufacturing, commercial and institutional facilities to track their energy consumption, factors related to energy use, and significant energy end-use. This is collectively referred to as the facility’s energy footprint.

  6. MULTIPLE SHAFT TOOL HEAD

    DOE Patents [OSTI]

    Colbert, H.P.

    1962-10-23

    An improved tool head arrangement is designed for the automatic expanding of a plurality of ferruled tubes simultaneously. A plurality of output shafts of a multiple spindle drill head are driven in unison by a hydraulic motor. A plurality of tube expanders are respectively coupled to the shafts through individual power train arrangements. The axial or thrust force required for the rolling operation is provided by a double acting hydraulic cylinder having a hollow through shaft with the shaft cooperating with an internally rotatable splined shaft slidably coupled to a coupling rigidly attached to the respectlve output shaft of the drill head, thereby transmitting rotary motion and axial thrust simultaneously to the tube expander. A hydraulic power unit supplies power to each of the double acting cylinders through respective two-position, four-way valves, under control of respective solenoids for each of the cylinders. The solenoids are in turn selectively controlled by a tool selection control unit which in turn is controlled by signals received from a programmed, coded tape from a tape reader. The number of expanders that are extended in a rolling operation, which may be up to 42 expanders, is determined by a predetermined program of operations depending upon the arrangement of the ferruled tubes to be expanded in the tube bundle. The tape reader also supplies dimensional information to a machine tool servo control unit for imparting selected, horizontal and/or vertical movement to the tool head assembly. (AEC)

  7. Competency Management and Cross-Cutting Activities | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Business Operations » Project Management Coordination Office » Competency Management and Cross-Cutting Activities Competency Management and Cross-Cutting Activities PMCO works with the Workforce Management Office to provide project and risk management training and certification support. Goals and Priorities Provide project and risk management training and certification as well as knowledge sharing. Blog News Mission Leadership Budget EERE Offices Business Operations Budget Workforce Management

  8. State and Regional Energy Risk Assessment Initiative

    Broader source: Energy.gov [DOE]

    OE is leading a State and Regional Energy Risk Assessment Initiative to help States better understand risks to their energy infrastructure so they can be better prepared to make informed decisions about their investments, resilience and hardening strategies, and asset management. As part of this Initiative, OE has developed a series of State and Regional Energy Risk Profiles that examine the relative magnitude of the risks that each State's energy infrastructure routinely encounters in comparison with the probable impacts.

  9. The Utility Management Conference

    Broader source: Energy.gov [DOE]

    The Utility Management Conference™ 2016 in San Diego is the place to be for leading utility and consulting staff. The technical program has been expanded to 36 sessions running in four concurrent rooms in order to provide utility leaders with the latest tools, techniques, best practices, and emerging solutions you need for effective utility management. This event will empower attendees, leading the water sector “On the Road to the Utilities of the Future.”

  10. Community-based Risk Screening Tool - Adaptation & Livelihoods...

    Open Energy Info (EERE)

    (IISD), Stockholm Environment Institute (SEI), International Union for Conservation of Nature (IUCN), HELVETAS Swiss Intercooperation Sector: Climate, Energy, Land, Water Focus...

  11. Integrated risk information system (IRIS)

    SciTech Connect (OSTI)

    Tuxen, L.

    1990-12-31

    The Integrated Risk Information System (IRIS) is an electronic information system developed by the US Environmental Protection Agency (EPA) containing information related to health risk assessment. IRIS is the Agency`s primary vehicle for communication of chronic health hazard information that represents Agency consensus following comprehensive review by intra-Agency work groups. The original purpose for developing IRIS was to provide guidance to EPA personnel in making risk management decisions. This original purpose for developing IRIS was to guidance to EPA personnel in making risk management decisions. This role has expanded and evolved with wider access and use of the system. IRIS contains chemical-specific information in summary format for approximately 500 chemicals. IRIS is available to the general public on the National Library of Medicine`s Toxicology Data Network (TOXNET) and on diskettes through the National Technical Information Service (NTIS).

  12. Fluid blade disablement tool

    DOE Patents [OSTI]

    Jakaboski, Juan-Carlos; Hughs, Chance G.; Todd, Steven N.

    2012-01-10

    A fluid blade disablement (FBD) tool that forms both a focused fluid projectile that resembles a blade, which can provide precision penetration of a barrier wall, and a broad fluid projectile that functions substantially like a hammer, which can produce general disruption of structures behind the barrier wall. Embodiments of the FBD tool comprise a container capable of holding fluid, an explosive assembly which is positioned within the container and which comprises an explosive holder and explosive, and a means for detonating. The container has a concavity on the side adjacent to the exposed surface of the explosive. The position of the concavity relative to the explosive and its construction of materials with thicknesses that facilitate inversion and/or rupture of the concavity wall enable the formation of a sharp and coherent blade of fluid advancing ahead of the detonation gases.

  13. Building energy analysis tool

    DOE Patents [OSTI]

    Brackney, Larry; Parker, Andrew; Long, Nicholas; Metzger, Ian; Dean, Jesse; Lisell, Lars

    2016-04-12

    A building energy analysis system includes a building component library configured to store a plurality of building components, a modeling tool configured to access the building component library and create a building model of a building under analysis using building spatial data and using selected building components of the plurality of building components stored in the building component library, a building analysis engine configured to operate the building model and generate a baseline energy model of the building under analysis and further configured to apply one or more energy conservation measures to the baseline energy model in order to generate one or more corresponding optimized energy models, and a recommendation tool configured to assess the one or more optimized energy models against the baseline energy model and generate recommendations for substitute building components or modifications.

  14. Log-Tool

    Energy Science and Technology Software Center (OSTI)

    2012-05-21

    Log files are typically semi- or un-structured. To be useable for visualization and machine learning, they need to be parsed into a standard, structured format. Log-tool is a tool for facilitating the parsing, structuring, and routing of log files (e.g. intrusion detection long, web server logs, system logs). It consists of three main components: (1) Input – it will input data from files, standard input, and syslog, (2) Parser – it will parse the logmore » file based on regular expressions into structured data (JSNO format), (3) Output – it will output structured data into commonly used formats, including Redis (a database), standard output, and syslog.« less

  15. Pneumatic soil removal tool

    DOE Patents [OSTI]

    Neuhaus, J.E.

    1992-10-13

    A soil removal tool is provided for removing radioactive soil, rock and other debris from the bottom of an excavation, while permitting the operator to be located outside of a containment for that excavation. The tool includes a fixed jaw, secured to one end of an elongate pipe, which cooperates with a movable jaw pivotably mounted on the pipe. Movement of the movable jaw is controlled by a pneumatic cylinder mounted on the pipe. The actuator rod of the pneumatic cylinder is connected to a collar which is slidably mounted on the pipe and forms part of the pivotable mounting assembly for the movable jaw. Air is supplied to the pneumatic cylinder through a handle connected to the pipe, under the control of an actuator valve mounted on the handle, to provide movement of the movable jaw. 3 figs.

  16. Pneumatic soil removal tool

    DOE Patents [OSTI]

    Neuhaus, John E.

    1992-01-01

    A soil removal tool is provided for removing radioactive soil, rock and other debris from the bottom of an excavation, while permitting the operator to be located outside of a containment for that excavation. The tool includes a fixed jaw, secured to one end of an elongate pipe, which cooperates with a movable jaw pivotably mounted on the pipe. Movement of the movable jaw is controlled by a pneumatic cylinder mounted on the pipe. The actuator rod of the pneumatic cylinder is connected to a collar which is slidably mounted on the pipe and forms part of the pivotable mounting assembly for the movable jaw. Air is supplied to the pneumatic cylinder through a handle connected to the pipe, under the control of an actuator valve mounted on the handle, to provide movement of the movable jaw.

  17. Stack Trace Analysis Tool

    Energy Science and Technology Software Center (OSTI)

    2013-02-19

    STAT is a light weight debugging tool that gathers and merges stack traces from all of the processes in a parallell application. STAT uses the MRNet tree based overlay network to broadcast commands from the tool front-end to the STAT daemons and for the front-end to gather the traces from the STAT daemons. As the traces propagate through the MRNet network tree, they are merged across all tasks to from a single call prefix tree.more » The call prefix tree can be examined to identify tasks with similar function call patterns and to delineate a small set of equivalence slasses. A representative task from each of these classes can then be fed into a full feature debugger like TotalView for root cause analysis.« less

  18. List of Programming Tools

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Programming Tools List List of Programming Tools Package Platform Version Module Install Date Date Made Default 7zip genepool 9.20.1 7zip/9.20.1 2013-01-14 2013-01-14 7zip phoebe 9.20.1 7zip/9.20.1 2013-01-14 2013-06-26 ABINIT cori 7.10.4 abinit/7.10.4 2015-09-24 2015-09-24 ABINIT edison 7.0.5 abinit/7.0.5 2013-03-12 2013-03-12 ABINIT edison 7.10.2 abinit/7.10.2 2015-01-27 ABINIT edison 7.10.4 abinit/7.10.4 2015-07-31 ABINIT edison 7.4.2 abinit/7.4.2 2014-06-26 2014-06-26 ABINIT edison 7.6.4

  19. Algal functional annotation tool

    SciTech Connect (OSTI)

    Lopez, D.; Casero, D.; Cokus, S. J.; Merchant, S. S.; Pellegrini, M.

    2012-07-01

    The Algal Functional Annotation Tool is a web-based comprehensive analysis suite integrating annotation data from several pathway, ontology, and protein family databases. The current version provides annotation for the model alga Chlamydomonas reinhardtii, and in the future will include additional genomes. The site allows users to interpret large gene lists by identifying associated functional terms, and their enrichment. Additionally, expression data for several experimental conditions were compiled and analyzed to provide an expression-based enrichment search. A tool to search for functionally-related genes based on gene expression across these conditions is also provided. Other features include dynamic visualization of genes on KEGG pathway maps and batch gene identifier conversion.

  20. Load Model Data Tool

    Energy Science and Technology Software Center (OSTI)

    2013-04-30

    The LMDT software automates the process of the load composite model data preparation in the format supported by the major power system software vendors (GE and Siemens). Proper representation of the load composite model in power system dynamic analysis is very important. Software tools for power system simulation like GE PSLF and Siemens PSSE already include algorithms for the load composite modeling. However, these tools require that the input information on composite load to bemore » provided in custom formats. Preparation of this data is time consuming and requires multiple manual operations. The LMDT software enables to automate this process. Software is designed to generate composite load model data. It uses the default load composition data, motor information, and bus information as an input. Software processes the input information and produces load composition model. Generated model can be stored in .dyd format supported by GE PSLF package or .dyr format supported by Siemens PSSE package.« less

  1. Stack Trace Analysis Tool

    Energy Science and Technology Software Center (OSTI)

    2008-01-16

    STAT is a light weight debugging tool that gathers and merges stack traces from all of the processes in a parallel application. STAT uses the MRNet free based overlay network to broadcast commands from the tool front-end to the STAT daemons and for the front-end to gather the traces from the STAT daemons. As the traces propagate through the MRNet network tree, they are merged across all tasks to form a single call prefix tree.more » The call prefix tree can be examined to identify tasks with similar function call patterns and to delineate a small set of equivalence classes. A representative task from each of these classes can then be fed into a full feature debugger like TotalView for root cause analysis.« less

  2. Manager`s views of public involvement

    SciTech Connect (OSTI)

    Branch, K.M.; Heerwagen, J.; Bradbury, J.

    1995-12-01

    Four issues commonly form the framework for debates about the acceptability of proposed projects or technologies--the substantive decision or technological choice; the treatment of the community by the proponent organization; the way the decision-making process has been structured and managed; and the status of institutional safeguards and protection. One of the clear messages of cultural theory is that differences in perspectives are a normal and inevitable part of society, and that attempts to resolve differences by persuasion are not likely to work. These findings are useful when considering the goals and possibilities of public involvement as a decision-making tool, and when designing or evaluating public involvement training programs for managers. The research reported here examines the viewpoints and concerns of managers and decision-makers about the four issues identified above, with particular emphasis on their perspectives and concerns about opening decision-making processes to the public and about managers` roles and responsibilities for structuring and managing open decision-making processes. Implications of these findings for public involvement training for managers is also discussed. The data presented in this paper were obtained from face-to-face interviews with managers and decision-makers with experience managing a variety of hazardous waste management decision-making processes. We conducted these interviews in the course of four separate research projects: needs assessments to support the design and development of a public involvement training program for managers; a study of community residents` and managers` perspectives on the chemical stockpile disposal program; an evaluation of the effectiveness of public involvement training for managers in the Department of Energy; and a study to develop indicators of the benefits and costs of public involvement.

  3. REMOTE RETRIEVING TOOL

    DOE Patents [OSTI]

    Fromm, L.W. Jr.

    1958-08-19

    A retrieving tool is described to securely grasp an object for emplacement in, or withdrawal from, an elongated tube. The object is grasped by hooks actuated by a wedge and cann mechanism. The mechanism on the end of a long rodlike structure is controlled by levers or bars at the access end of the tube. This device is particularly useful for positioning fuel elements within a reactor core.

  4. Environmental Compliance Assistance Tool

    Energy Science and Technology Software Center (OSTI)

    1999-04-16

    ENVIROCAT is a database/knowledge base software system designed to assist in environment, safety and health (ES&H) regulatory compliance assessments of manufacturing processes. Materials and processes are mapped to ES&H regulations. The regulations database identifies materials'' quantities and limits of compliance. Materials are identified per descriptive name or CAS number. ENVIROCAT has an interactive user/tool capability such that a question and answer session on materials and processes is custom tailored to a particular manufacturing site.

  5. Software and Tools

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    File Storage Software and Tools Performance and Optimization Retirement Plans Jesup Dirac Edison Phase I Euclid - Retired 01/31/2013 Franklin - Retired 04/30/12 Bassi Storage & File Systems Data & Analytics Connecting to NERSC Queues and Scheduling Job Logs & Statistics Application Performance Training & Tutorials Software Policies User Surveys NERSC Users Group User Announcements Help Staff Blogs Request Repository Mailing List Operations for: Passwords & Off-Hours Status

  6. Software and Tools

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Franklin Queues and Policies File storage and I/O Software and Tools Debugging and profiling Cray XT Documentation Franklin is Being Retired Bassi Storage & File Systems Data & Analytics Connecting to NERSC Queues and Scheduling Job Logs & Statistics Application Performance Training & Tutorials Software Policies User Surveys NERSC Users Group User Announcements Help Staff Blogs Request Repository Mailing List Operations for: Passwords & Off-Hours Status 1-800-66-NERSC,

  7. Software and Tools

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    File Storage and I/O Software and Tools Debugging and profiling Performance and Optimization Cray XE Documentation Cluster Compatibility Mode Hopper, Cray XE6 Carver Jesup Dirac Edison Phase I Euclid - Retired 01/31/2013 Franklin - Retired 04/30/12 Bassi Storage & File Systems Data & Analytics Connecting to NERSC Queues and Scheduling Job Logs & Statistics Application Performance Training & Tutorials Software Policies User Surveys NERSC Users Group User Announcements Help Staff

  8. ORISE: National Security and Emergency Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Emergency Management Emergency Response Crisis and Risk Communication Forensic Science How ORISE is Making a Difference Overview Exercises and Planning Training and Technology...

  9. Fluid sampling tool

    DOE Patents [OSTI]

    Garcia, Anthony R.; Johnston, Roger G.; Martinez, Ronald K.

    1999-05-25

    A fluid sampling tool for sampling fluid from a container. The tool has a fluid collecting portion which is drilled into the container wall, thereby affixing it to the wall. The tool may have a fluid extracting section which withdraws fluid collected by the fluid collecting section. The fluid collecting section has a fluted shank with an end configured to drill a hole into a container wall. The shank has a threaded portion for tapping the borehole. The shank is threadably engaged to a cylindrical housing having an inner axial passageway sealed at one end by a septum. A flexible member having a cylindrical portion and a bulbous portion is provided. The housing can be slid into an inner axial passageway in the cylindrical portion and sealed to the flexible member. The bulbous portion has an outer lip defining an opening. The housing is clamped into the chuck of a drill, the lip of the bulbous section is pressed against a container wall until the shank touches the wall, and the user operates the drill. Wall shavings (kerf) are confined in a chamber formed in the bulbous section as it folds when the shank advances inside the container. After sufficient advancement of the shank, an o-ring makes a seal with the container wall.

  10. Fluid sampling tool

    DOE Patents [OSTI]

    Garcia, A.R.; Johnston, R.G.; Martinez, R.K.

    1999-05-25

    A fluid sampling tool is described for sampling fluid from a container. The tool has a fluid collecting portion which is drilled into the container wall, thereby affixing it to the wall. The tool may have a fluid extracting section which withdraws fluid collected by the fluid collecting section. The fluid collecting section has a fluted shank with an end configured to drill a hole into a container wall. The shank has a threaded portion for tapping the borehole. The shank is threadably engaged to a cylindrical housing having an inner axial passageway sealed at one end by a septum. A flexible member having a cylindrical portion and a bulbous portion is provided. The housing can be slid into an inner axial passageway in the cylindrical portion and sealed to the flexible member. The bulbous portion has an outer lip defining an opening. The housing is clamped into the chuck of a drill, the lip of the bulbous section is pressed against a container wall until the shank touches the wall, and the user operates the drill. Wall shavings (kerf) are confined in a chamber formed in the bulbous section as it folds when the shank advances inside the container. After sufficient advancement of the shank, an o-ring makes a seal with the container wall. 6 figs.

  11. Energy Storage Computational Tool | Open Energy Information

    Open Energy Info (EERE)

    Energy Storage Computational Tool Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Energy Storage Computational Tool AgencyCompany Organization: Navigant Consulting...

  12. Decision Support Tool: Integrated REDD+ accounting frameworks...

    Open Energy Info (EERE)

    Decision Support Tool: Integrated REDD+ accounting frameworks: Nested national approaches Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Decision Support Tool:...

  13. Renewable Energy Financial Instruments Guidance Tool (REFINe...

    Open Energy Info (EERE)

    Guidance Tool (REFINe) Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Renewable Energy Financial Instruments Guidance Tool (REFINe) Focus Area: Renewable Energy...

  14. LEDSGP/tools | Open Energy Information

    Open Energy Info (EERE)

    Data & Tools Publications Training Knowledge Portals LEDS Benefits Back to top Peer-Learning Tools LEDS Activity and Tool Inventory Our LEDS Activity and Tool Inventory provides...

  15. Approaches to acceptable risk: a critical guide

    SciTech Connect (OSTI)

    Fischhoff, B.; Lichtenstein, S.; Slovic, P.; Keeney, R.; Derby, S.

    1980-12-01

    Acceptable-risk decisions are an essential step in the management of technological hazards. In many situations, they constitute the weak (or missing) link in the management process. The absence of an adequate decision-making methodology often produces indecision, inconsistency, and dissatisfaction. The result is neither good for hazard management nor good for society. This report offers a critical analysis of the viability of various approaches as guides to acceptable-risk decisions. This report seeks to define acceptable-risk decisions and to examine some frequently proposed, but inappropriate, solutions. 255 refs., 22 figs., 25 tabs.

  16. Algal functional annotation tool

    Energy Science and Technology Software Center (OSTI)

    2012-07-12

    Abstract BACKGROUND: Progress in genome sequencing is proceeding at an exponential pace, and several new algal genomes are becoming available every year. One of the challenges facing the community is the association of protein sequences encoded in the genomes with biological function. While most genome assembly projects generate annotations for predicted protein sequences, they are usually limited and integrate functional terms from a limited number of databases. Another challenge is the use of annotations tomore » interpret large lists of 'interesting' genes generated by genome-scale datasets. Previously, these gene lists had to be analyzed across several independent biological databases, often on a gene-by-gene basis. In contrast, several annotation databases, such as DAVID, integrate data from multiple functional databases and reveal underlying biological themes of large gene lists. While several such databases have been constructed for animals, none is currently available for the study of algae. Due to renewed interest in algae as potential sources of biofuels and the emergence of multiple algal genome sequences, a significant need has arisen for such a database to process the growing compendiums of algal genomic data. DESCRIPTION: The Algal Functional Annotation Tool is a web-based comprehensive analysis suite integrating annotation data from several pathway, ontology, and protein family databases. The current version provides annotation for the model alga Chlamydomonas reinhardtii, and in the future will include additional genomes. The site allows users to interpret large gene lists by identifying associated functional terms, and their enrichment. Additionally, expression data for several experimental conditions were compiled and analyzed to provide an expression-based enrichment search. A tool to search for functionally-related genes based on gene expression across these conditions is also provided. Other features include dynamic visualization of genes on KEGG pathway maps and batch gene identifier conversion. CONCLUSIONS: The Algal Functional Annotation Tool aims to provide an integrated data-mining environment for algal genomics by combining data from multiple annotation databases into a centralized tool. This site is designed to expedite the process of functional annotation and the interpretation of gene lists, such as those derived from high-throughput RNA-seq experiments. The tool is publicly available at http://pathways.mcdb.ucla.edu.« less

  17. Algal functional annotation tool

    SciTech Connect (OSTI)

    2012-07-12

    Abstract BACKGROUND: Progress in genome sequencing is proceeding at an exponential pace, and several new algal genomes are becoming available every year. One of the challenges facing the community is the association of protein sequences encoded in the genomes with biological function. While most genome assembly projects generate annotations for predicted protein sequences, they are usually limited and integrate functional terms from a limited number of databases. Another challenge is the use of annotations to interpret large lists of 'interesting' genes generated by genome-scale datasets. Previously, these gene lists had to be analyzed across several independent biological databases, often on a gene-by-gene basis. In contrast, several annotation databases, such as DAVID, integrate data from multiple functional databases and reveal underlying biological themes of large gene lists. While several such databases have been constructed for animals, none is currently available for the study of algae. Due to renewed interest in algae as potential sources of biofuels and the emergence of multiple algal genome sequences, a significant need has arisen for such a database to process the growing compendiums of algal genomic data. DESCRIPTION: The Algal Functional Annotation Tool is a web-based comprehensive analysis suite integrating annotation data from several pathway, ontology, and protein family databases. The current version provides annotation for the model alga Chlamydomonas reinhardtii, and in the future will include additional genomes. The site allows users to interpret large gene lists by identifying associated functional terms, and their enrichment. Additionally, expression data for several experimental conditions were compiled and analyzed to provide an expression-based enrichment search. A tool to search for functionally-related genes based on gene expression across these conditions is also provided. Other features include dynamic visualization of genes on KEGG pathway maps and batch gene identifier conversion. CONCLUSIONS: The Algal Functional Annotation Tool aims to provide an integrated data-mining environment for algal genomics by combining data from multiple annotation databases into a centralized tool. This site is designed to expedite the process of functional annotation and the interpretation of gene lists, such as those derived from high-throughput RNA-seq experiments. The tool is publicly available at http://pathways.mcdb.ucla.edu.

  18. An Overview of Public Domain Tools for Measuring the Sustainability of Environmental Remediation - 12060

    SciTech Connect (OSTI)

    Claypool, John E.; Rogers, Scott

    2012-07-01

    The application of sustainability principles to the investigation and remediation of contaminated sites is an area of rapid development within the environmental profession, with new business practices, tools, and performance standards for identifying, evaluating, and managing the 'collateral' impacts of cleanup projects to the environment, economy and society coming from many organizations. Guidelines, frameworks, and standards of practice for 'green and sustainable remediation' (GSR) have been released and are under development by the Sustainable Remediation Forum (SURF), the American Society for Testing Materials (ASTM), the Interstate Technology Roundtable Commission (ITRC) and other organizations in the U.S. and internationally. In response to Executive Orders from the President, Federal government agencies have developed policies, procedures and guidelines for evaluating and reporting the sustainability of their environmental restoration projects. Private sector companies in the petroleum, utility, manufacturing, defense, and other sectors are developing their own corporate GSR programs to improve day-to-day management of contaminated sites and to support external reporting as part of their corporate social responsibility (CSR) efforts. The explosion of mandates, policy, procedures and guidance raises the question of how to determine whether a remediation technology or cleanup approach is green and/or sustainable. The environmental profession has responded to this question by designing, developing and deploying a wide array of tools, calculators, and databases that enable regulatory agencies, site managers and environmental professionals to calculate the collateral impacts of their remediation projects in the environmental, social, and economic domains. Many of these tools are proprietary ones developed by environmental engineering/consulting firms for use in their consulting engagements and/or tailored specifically to meet the needs of their clients. When it comes to the public domain, Federal government agencies are spearheading the development of software tools to measure and report emissions of air pollutants (e.g., carbon dioxide, other greenhouse gases, criteria air pollutants); consumption of energy, water and natural resources; accident and safety risks; project costs and other economic metrics. Most of the tools developed for the Government are available to environmental practitioners without charge, so they are growing in usage and popularity. The key features and metrics calculated by the available public-domain tools for measuring the sustainability of environmental remediation projects share some commonalities but there are differences amongst the tools. The SiteWise{sup TM} sustainability tool developed for the Navy and US Army will be compared with the Sustainable Remediation Tool (SRT{sup TM}) developed for the US Air Force (USAF). In addition, the USAF's Clean Solar and Wind Energy in Environmental Programs (CleanSWEEP), a soon-to-be-released tool for evaluating the economic feasibility of utilizing renewal energy for powering remediation systems will be described in the paper. (authors)

  19. Redis database administration tool

    Energy Science and Technology Software Center (OSTI)

    2013-02-13

    MyRedis is a product of the Lorenz subproject under the ASC Scirntific Data Management effort. MyRedis is a web based utility designed to allow easy administration of instances of Redis databases. It can be usedd to view and manipulate data as well as run commands directly against a variety of different Redis hosts.

  20. Activity-level Work Planning and Control in the Hanford Site Worker Evaluation Tool

    Broader source: Energy.gov [DOE]

    Slide Presentation by Ted Giltz, Volpentest HAMMER Federal Training Center. Hanford Site Worker Eligibility Tool, Verifying Activity-Level Worker Medical Clearance and Training. The Hanford Site Worker Eligibility Tool (HSWET) provides line management an easy to use tool to determine if workers are medically cleared and trained to perform work safely.