National Library of Energy BETA

Sample records for rio colorado project

  1. EIS-0395: San Luis Rio Colorado Project, AZ

    Broader source: Energy.gov [DOE]

    This EIS analyzes DOE's decision to construct and operate a proposed transmission line originating at the proposed San Luis Rio Colorado (SLRC) Power Center in Sonora, Mexico, interconnect with Western's existing Gila Substation, and continue to Arizona Public Service Company’s (APS) North Gila Substation

  2. Rio Grande County, Colorado: Energy Resources | Open Energy Informatio...

    Open Energy Info (EERE)

    B. Places in Rio Grande County, Colorado Center, Colorado Del Norte, Colorado Monte Vista, Colorado South Fork, Colorado Retrieved from "http:en.openei.orgw...

  3. Colorado

    U.S. Energy Information Administration (EIA) Indexed Site

    Colorado

  4. Field Projects: Durango, Colorado

    Broader source: Energy.gov [DOE]

    Personnel from Sandia National Laboratories in New Mexico installed four permeable reactive barriers  PRBs at the Durango, Colorado, Uranium Mill Tailings Radiation Control Act Title I site in...

  5. EIS-0519: Rio Grande LNG Project and Rio Bravo Pipeline Project...

    Office of Environmental Management (EM)

    19: Rio Grande LNG Project and Rio Bravo Pipeline Project; Kleberg, Kenedy, Willacy, and Cameron Counties, Texas EIS-0519: Rio Grande LNG Project and Rio Bravo Pipeline Project; ...

  6. EA-2008: Colorado River Storage Project Programmatic Operations...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Programmatic Operations and Maintenance Project; Coconino, Maricopa, Navajo, ... EA-2008: Colorado River Storage Project Programmatic Operations and Maintenance Project; ...

  7. Colorado Green Wind Power Project | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search Name Colorado Green Wind Power Project Facility Colorado Green Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service...

  8. DOE - Office of Legacy Management -- Rio_Monitoring

    Office of Legacy Management (LM)

    RioMonitoring Rio Blanco, Colorado, Site Natural Gas Well Monitoring Results Project Rio Blanco Monitoring Results Fourth Quarter 2010 Separated Water at a Natural Gas Plant, ...

  9. EA-1611: Colorado Highlands Wind Project, Logan County, Colorado

    Broader source: Energy.gov [DOE]

    DOE’s Western Area Power Administration prepared an EA in 2009 to assess the potential environmental impacts of interconnecting the proposed Colorado Highlands Wind Project to Western’s transmission system. The EA analyzed a proposal for 60 wind turbine generators with a total output nameplate capacity of 90 megawatts (MW). Western prepared a supplemental EA to assess the potential environmental impacts of the proposed expansion of the project by 11 wind turbine generators that would add approximately 20 MW. Additional information is available on the Western Area Power Administration webpage for this project.

  10. Tectonic analysis of the Rio Grande Rift Zone, central Colorado...

    Open Energy Info (EERE)

    Rift Zone, central ColoradoThesisDissertation Abstract Abstract unavailable. Author D.H. Knepper Organization Colorado School of Mines Published Publisher Not Provided, 1974...

  11. May 2012 Groundwater and Surface Water Sampling at the Rio Blanco, Colorado, Site (Data Validation Package)

    SciTech Connect (OSTI)

    2012-12-01

    Annual sampling was conducted at the Rio Blanco, Colorado, site for the Long-Term Hydrologic Monitoring Program May 9-10, 2012, to monitor groundwater and surface water for potential radionuclide contamination. Sampling and analyses were conducted as specified in Sampling and Analysis Plan for the U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated). A duplicate sample was collected from location Johnson Artesian WL. Samples were analyzed for gamma-emitting radionuclides by high-resolution gamma spectrometry and for tritium using the conventional and enrichment methods. Results of this monitoring at the Rio Blanco site demonstrate that groundwater and surface water outside the site boundaries have not been affected by project-related contaminants.

  12. May 2011 Groundwater and Surface Water Sampling at the Rio Blanco, Colorado, Site (Data Validation Package)

    SciTech Connect (OSTI)

    2011-12-01

    Annual sampling was conducted at the Rio Blanco, Colorado, site for the Long-Term Hydrologic Monitoring Program May 16-17, 2011, to monitor groundwater and surface water for potential radionuclide contamination. Sampling and analyses were conducted as specified in Sampling and Analysis Plan for the U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated). A duplicate sample was collected from location Johnson Artesian WL. Samples were analyzed by the U.S. Environmental Protection Agency (EPA) Radiation&Indoor Environments National Laboratory in Las Vegas, Nevada. Samples were analyzed for gamma-emitting radionuclides by high-resolution gamma spectrometry, and for tritium using the conventional method. Tritium was not measured using the enrichment method because the EPA laboratory no longer offers that service. Results of this monitoring at the Rio Blanco site demonstrate that groundwater and surface water outside the boundaries have not been affected by project-related contaminants.

  13. DOE - Office of Legacy Management -- Project Rio Blanco - CO 0-09

    Office of Legacy Management (LM)

    Rio Blanco - CO 0-09 FUSRAP Considered Sites Site: Project Rio Blanco (CO.0-09) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: ~ 52 miles north of Grand Junction, Co. , Rio Blanco County , Colorado CO.0-09-1 Evaluation Year: 1985 CO.0-09-1 Site Operations: The project was a cooperative research effort undertaken in 1973 between CER Geonuclear Corp, Continental Oil Co (Conoco), and the US Energy Research and Development Administration

  14. Commercial-Scale Project Development and Finance Workshop: Colorado...

    Energy Savers [EERE]

    Project Development and Finance Workshop: Colorado Commercial-Scale Project Development and Finance Workshop: Colorado September 1, 2015 - 12:00pm Addthis Sept. 1-3, 2015 Golden, ...

  15. Commercial-Scale Project Development and Finance Workshop: Colorado |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Project Development and Finance Workshop: Colorado Commercial-Scale Project Development and Finance Workshop: Colorado September 1, 2015 - 12:00pm Addthis Sept. 1-3, 2015 Golden, Colorado National Renewable Energy Laboratory The DOE Office of Indian Energy hosted a Commercial-Scale Renewable Energy Project Development and Finance Workshop on Sept. 1-3, 2015, at the National Renewable Energy Laboratory in Golden, Colorado. Download workshop agenda and presentations.

  16. Commercial-Scale Renewable Energy Project Development Workshop: Colorado |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Workshop: Colorado Commercial-Scale Renewable Energy Project Development Workshop: Colorado July 29, 2014 - 9:52am Addthis July 29-31, 2014 Golden, Colorado National Renewable Energy Laboratory The Office of Indian Energy hosted a Commercial-Scale Renewable Energy Project Development and Finance Workshop July 29-31, 2014, at the National Renewable Energy Laboratory in Golden, Colorado. Download the agenda and presentations. Addthis Related Articles Commercial-Scale

  17. EIS-0370: Windy Gap Firming Project, Colorado

    Broader source: Energy.gov [DOE]

    This EIS, prepared by the Department of the Interior (Bureau of Reclamation, Great Plains Region), with DOE's Western Area Power Administration as a cooperating agency, evaluates the environmental impacts of a proposal to construct new water storage reservoir capacity southwest of Loveland, Colorado. Western has jurisdiction over the transmission line that would be relocated if the proposed action is implemented and would market additional power that may be generated as a result of the project.

  18. New developments in Colorado geothermal energy projects | Open...

    Open Energy Info (EERE)

    library Journal Article: New developments in Colorado geothermal energy projects Authors J. Held and F. Henderson Published Journal Geothermal Resources Council- Transactions,...

  19. PROJECT PROFILE: Colorado State University (PVRD-SIPS) | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Colorado State University (PVRD-SIPS) PROJECT PROFILE: Colorado State University (PVRD-SIPS) Project Name: Novel Approach to Front-Contact Passivation for Cadmium Telluride Photovoltaics Funding Opportunity: PVRD-SIPS SunShot Subprogram: Photovoltaics Location: Fort Collins, CO SunShot Award Amount: $150,000 Awardee Cost Share: $16,667 Project Investigator: Jason Kephart This project aims to develop front contact passivation for cadmium telluride (CdTe) photovoltaics (PV) through the

  20. Rio Blanco, Colorado, Long-Term Hydrologic Monitoring Program Sampling and Analysis Results for 2009

    SciTech Connect (OSTI)

    2009-12-21

    The U.S. Department of Energy (DOE) Office of Legacy Management conducted annual sampling at the Rio Blanco, Colorado, Site, for the Long-Term Hydrologic Monitoring Program (LTHMP) on May 13 and 14, 2009. Samples were analyzed by the U.S. Environmental Protection Agency (EPA) Radiation&Indoor Environments National Laboratory in Las Vegas, Nevada. Samples were analyzed for gamma-emitting radionuclides by high-resolution gamma spectroscopy and tritium using the conventional and enriched methods.

  1. Categorical Exclusion Determinations: Western Area Power Administration-Colorado River Storage Project Management Center

    Broader source: Energy.gov [DOE]

    Categorical Exclusion Determinations issued by Western Area Power Administration-Colorado River Storage Project Management Center.

  2. Colorado Better Buildings Project Final Report

    SciTech Connect (OSTI)

    Strife, Susie; Yancey, Lea

    2013-12-30

    The Colorado Better Buildings project intended to bring new and existing energy efficiency model programs to market with regional collaboration and funding partnerships. The goals for Boulder County and its program partners were to advance energy efficiency investments, stimulate economic growth in Colorado and advance the state’s energy independence. Collectively, three counties set out to complete 9,025 energy efficiency upgrades in 2.5 years and they succeeded in doing so. Energy efficiency upgrades have been completed in more than 11,000 homes and businesses in these communities. Boulder County and its partners received a $25 million BetterBuildings grant from the U.S. Department of Energy under the American Recovery and Reinvestment Act in the summer of 2010. This was also known as the Energy Efficiency and Conservation Block Grants program. With this funding, Boulder County, the City and County of Denver, and Garfield County set out to design programs for the residential and commercial sectors to overcome key barriers in the energy upgrade process. Since January 2011, these communities have paired homeowners and business owners with an Energy Advisor – an expert to help move from assessment to upgrade with minimal hassle. Pairing this step-by-step assistance with financing incentives has effectively addressed many key barriers, resulting in energy efficiency improvements and happy customers. An expert energy advisor guides the building owner through every step of the process, coordinating the energy assessment, interpreting results for a customized action plan, providing a list of contractors, and finding and applying for all available rebates and low-interest loans. In addition to the expert advising and financial incentives, the programs also included elements of social marketing, technical assistance, workforce development and contractor trainings, project monitoring and verification, and a cloud-based customer data system to coordinate among field

  3. May 2013 Groundwater and Surface Water Sampling at the Rio Blanco, Colorado, Site (Data Validation Package)

    SciTech Connect (OSTI)

    2013-10-01

    Annual sampling was conducted at the Rio Blanco, Colorado, site for the Long-Term Hydrologic Monitoring Program May 14-16, 2013, to monitor groundwater and surface water for potential radionuclide contamination. Sampling and analyses were conducted as specified in Sampling and Analysis Plan for the U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated). A duplicate sample was collected from location CER #1 Black Sulphur. Samples were analyzed for gamma-emitting radionuclides by high-resolution gamma spectrometry and for tritium using the conventional and enrichment methods.

  4. Environmental assessment, expanded Ponnequin wind energy project, Weld County, Colorado

    SciTech Connect (OSTI)

    1999-02-01

    The US Department of Energy (DOE) has considered a proposal from the State of Colorado, Office of Energy Conservation (OEC), for funding construction of the Expanded Ponnequin Wind Project in Weld County, Colorado. OEC plans to enter into a contracting arrangement with Public Service Company of Colorado (PSCo) for the completion of these activities. PSCo, along with its subcontractors and business partners, are jointly developing the Expanded Ponnequin Wind Project. The purpose of this Final Environmental Assessment (EA) is to provide DOE and the public with information on potential environmental impacts associated with the Expanded Ponnequin Wind Energy Project. This EA, and public comments received on it, were used in DOE`s deliberations on whether to release funding for the expanded project under the Commercialization Ventures Program.

  5. EA-1825: Limon Wind Project, Lincoln County, Colorado

    Broader source: Energy.gov [DOE]

    DOE’s Western Area Power Administration is preparing this EA to evaluate the environmental impacts of a proposal to interconnect the proposed Limon Wind Project, in Lincoln County, Colorado, to Western’s transmission grid. NOTE: Proponent has postponed development of the project and withdrawn its interconnection requeest with WAPA.

  6. Economic impact study of the Uranium Mill Tailings Remedial Action project in Colorado: Colorado state fiscal year 1995

    SciTech Connect (OSTI)

    1995-12-01

    This Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year (FY) 1995 (1 July 1994 through 30 June 1995). To capture employment information, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Gunnison, Maybell, Naturita, Rifle, and Slick Rock, Colorado. Economic data were requested from the Remedial Action Contractor (RAC), the Technical Assistance Contractor (TAC) and the US Department of Energy (DOE). The most significant benefits associated with the UMTRA Project in Colorado are summarized.

  7. 2015 Long-Term Hydrologic Monitoring Program Sampling and Analysis Results at Rio Blanco, Colorado

    SciTech Connect (OSTI)

    Findlay, Rick; Kautsky, Mark

    2015-12-01

    The U.S. Department of Energy (DOE) Office of Legacy Management conducted annual sampling at the Rio Blanco, Colorado, Site for the Long-Term Hydrologic Monitoring Program (LTHMP) on May 20–21, 2015. This report documents the analytical results of the Rio Blanco annual monitoring event, the trip report, and the data validation package. The groundwater and surface water monitoring samples were shipped to the GEL Group Inc. laboratories for conventional analysis of tritium and analysis of gamma-emitting radionuclides by high-resolution gamma spectrometry. A subset of water samples collected from wells near the Rio Blanco site was also sent to GEL Group Inc. for enriched tritium analysis. All requested analyses were successfully completed. Samples were collected from a total of four onsite wells, including two that are privately owned. Samples were also collected from two additional private wells at nearby locations and from nine surface water locations. Samples were analyzed for gamma-emitting radionuclides by high-resolution gamma spectrometry, and they were analyzed for tritium using the conventional method with a detection limit on the order of 400 picocuries per liter (pCi/L). Four locations (one well and three surface locations) were analyzed using the enriched tritium method, which has a detection limit on the order of 3 pCi/L. The enriched locations included the well at the Brennan Windmill and surface locations at CER-1, CER-4, and Fawn Creek 500 feet upstream.

  8. An evaluation of baseline conditions at lease tract C-a, Rio Blanco County, Colorado

    SciTech Connect (OSTI)

    Barteaux, W.L.; Biezugbe, G.

    1987-09-01

    An analysis was made of baseline groundwater quality data from oil shale lease tract C-a, managed by Rio Blanco Oil Shale Company. The data are limited in several respects. All conclusions drawn from the data must be qualified with these limitations. Baseline conditions were determined by analyzing data from wells in the upper bedrock and lower bedrock aquifers and from the alluvial wells. Baseline data were considered all data collected before mining operations began. The water quality was then evaluated using the 1987 Colorado State Basic Standards for Ground Water as a basis. The maximum baseline values for several parameters in each aquifer exceed the standard values. The quality of the upper lower bedrock aquifers varies from region to region within the site. Data on the lower bedrock aquifer are insufficient for speculation on the cause of the variations. Variations in the upper bedrock aquifer are possibly caused by leakage of the lower bedrock aquifer. 16 refs., 9 figs., 9 tabs.

  9. EIS-0370: Windy Gap Firming Project; North Central Colorado

    Broader source: Energy.gov [DOE]

    This EIS, prepared by the Department of the Interior (Bureau of Reclamation, Great Plains Region), with DOE's Western Area Power Administration as a cooperating agency, evaluates the environmental impacts of a proposal to construct new water storage reservoir capacity southwest of Loveland, Colorado. Western has jurisdiction over the transmission line that would be relocated if the proposed action is implemented and would market additional power that may be generated as a result of the project.

  10. Environmental Assessment Expanded Ponnequin Wind Energy Project Weld County, Colorado

    SciTech Connect (OSTI)

    N /A

    1999-03-02

    The U.S.Department of Energy (DOE) has considered a proposal from the State of Colorado, Office of Energy Conservation (OEC), for funding construction of the Expanded Ponnequin Wind Project in Weld County, Colorado. OEC plans to enter into a contracting arrangement with Public Service Company of Colorado (PSCO) for the completion of these activities. PSCo, along with its subcontractors and business partners, are jointly developing the Expanded Ponnequin Wind Project. DOE completed an environmental assessment of the original proposed project in August 1997. Since then, the geographic scope and the design of the project changed, necessitating additional review of the project under the National Environmental Policy Act. The project now calls for the possible construction of up to 48 wind turbines on State and private lands. PSCo and its partners have initiated construction of the project on private land in Weld County, Colorado. A substation, access road and some wind turbines have been installed. However, to date, DOE has not provided any funding for these activities. DOE, through its Commercialization Ventures Program, has solicited applications for financial assistance from state energy offices, in a teaming arrangement with private-sector organizations, for projects that will accelerate the commercialization of emerging renewable energy technologies. The Commercialization Ventures Program was established by the Renewable Energy and Energy Efficiency Technology Competitiveness Act of 1989 (P.L. 101-218) as amended by the Energy Policy Act of 1992 (P.L. 102-486). The Program seeks to assist entry into the marketplace of newly emerging renewable energy technologies, or of innovative applications of existing technologies. In short, an emerging renewable energy technology is one which has already proven viable but which has had little or no operational experience. The Program is managed by the Department of Energy, Office of Energy Efficiency and Renewable Energy. The

  11. Economic impact study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado State fiscal year 1994. Revision 1

    SciTech Connect (OSTI)

    Not Available

    1994-12-01

    The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year 1994 (1 July 1993 through 30 June 1994). To capture employment information, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Naturita, Gunnison, and Rifle, Colorado. Economic data were requested from each site prime subcontractor, as well as from the Remedial Action Contractor. Information on wages, taxes, and subcontract expenditures in combination with estimates and economic multipliers is used to estimate the dollar economic benefits to Colorado during the state fiscal year. Finally, the fiscal year 1994 estimates are compared to fiscal year 1993 employment and economic information.

  12. Ground Water Compliance Action Plan for the Durango, Colorado,UMTRA Project Site

    Office of Legacy Management (LM)

    for the U.S. Department of Energy Approved for public release; distribution is unlimited. Ground Water Compliance Action Plan for the Durango, Colorado, UMTRA Project Site February 2008 This page intentionally left blank U0165200 Ground Water Compliance Action Plan for the Durango, Colorado, UMTRA Project Site February 2008 Prepared by U.S. Department of Energy Grand Junction Office Grand Junction, Colorado Work Performed under DOE Contract No. DE-AC13-02GJ79491 This page intentionally left

  13. Economic impact study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado state fiscal year 1994

    SciTech Connect (OSTI)

    Not Available

    1994-11-01

    The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year 1994. To capture employment information, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Naturita, Gunnison, and Rifle, Colorado. Economic data were requested from each site prime subcontractor, as well as from the Remedial Action Contractor. The most significant benefits associated with the UMTRA Project in Colorado are summarized. This study assesses benefits associated with the Grand Junction, Gunnison, Naturita, and Rifle UMTRA Projects sites for the 1-year period under study. Work at the Naturita site was initiated in April 1994 and involved demolition of buildings at the processing site. Actual start-up of remediation of Naturita is planned to begin in the spring of 1995. Work at the Slick Rock and Maybell sites is expected to begin in 1995. The only current economic benefits associated with these sites are related to UMTRA Project support work.

  14. PROJECT PROFILE: University of Colorado Boulder (PVRD-SIPS) | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Colorado Boulder (PVRD-SIPS) PROJECT PROFILE: University of Colorado Boulder (PVRD-SIPS) Project Name: Theoretical Design and Discovery of the Most Promising Previously Overlooked Hybrid Perovskites Compounds Funding Opportunity: PVRD-SIPS SunShot Subprogram: Photovoltaics Location: Boulder, CO SunShot Award Amount: $225,000 Awardee Cost Share: $25,000 Project Investigator: Alex Zunger This project uses theoretical design to discover promising prospects for stable and lead-free hybrid

  15. EIS-0370: Windy Gap Firming Project, Colorado | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    a cooperating agency, evaluates the environmental impacts of a proposal to construct new water storage reservoir capacity southwest of Loveland, Colorado. Western has jurisdiction...

  16. Economic impact study of the Uranium Mill Tailings Remedial Action project in Colorado: Colorado state fiscal year 1995. Revision 1

    SciTech Connect (OSTI)

    1995-12-01

    As required by the Romer-Twining Agreement of 1990, the US Department of Energy (DOE) has prepared this annual economic impact study for the state of Colorado. This report assesses the economic impacts related to the DOE Uranium Mill Tailings Remedial Action (UMTRA) Project in Colorado during the state fiscal year (FY) between 1 July 1994 and 30 June 1995. To estimate net economic benefit, employment, salaries and wages, and other related economic benefits are discussed, quantified, and then compared to the state`s 10 percent share of the remedial action costs. Actual data obtained from sites currently undergoing remedial action were used as the basis for analyses. If data were not available, estimates were used to derive economic indicators. This study describes the types of employment associated with the UMTRA Project and estimates of the numbers of people employed by UMTRA Project subcontractors in Colorado during state FY 1995. Employment totals are reported in estimated average annual jobs; however, the actual number of workers at the site fluctuates depending on weather and on the status of remedial action activities. In addition, the actual number of people employed on the Project during the year may be higher than the average annual employment reported due to the temporary nature of some of the jobs.

  17. Field Projects: Cañon City, Colorado

    Broader source: Energy.gov [DOE]

    In June 2000, Cotter Corporation installed a PRB at its uranium ore processing millsite in Cañon City, Colorado. The PRB contains zero-valent iron (ZVI) that treated molybdenum and uranium...

  18. EIS-0351: Operation of Flaming Gorge Dam, Colorado River Storage Project, Colorado River, UT

    Broader source: Energy.gov [DOE]

    The Secretary of the United States Department of the Interior (Secretary), acting through the Bureau of Reclamation (Reclamation), is considering whether to implement a proposed action under which Flaming Gorge Dam would be operated to achieve the flow and temperature regimes recommended in the September 2000 report Flow and Temperature Recommendations for Endangered Fishes in the Green River Downstream of Flaming Gorge Dam (2000 Flow and Temperature Recommendations), published by the Upper Colorado River Endangered Fish Recovery Program (Recovery Program).

  19. CNCC Craig Campus Geothermal Project …Craig, Colorado | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy CNCC Craig Campus Geothermal Project …Craig, Colorado CNCC Craig Campus Geothermal Project …Craig, Colorado Feasibility study of GHP technology for new Craig Campus and conducted energy analysis modeling with Architect and Engineers. 96-well closed loop GHP well field to provide geothermal energy as a common utility for a new community college campus. gshp_boyd_cncc_craig_campus.pdf (698.36 KB) More Documents & Publications Comparison of building energy use before and after GSHP

  20. Geology and chemical analyses of coal, Mesaverde Group (Cretaceous), Lower White River coal field, Moffat and Rio Blanco Counties, Colorado

    SciTech Connect (OSTI)

    Hildebrand, R.T.; Garrigues, R.S.

    1981-01-01

    The Lower White River coal field comprises an area of approximately 930 square miles underlain by coal-bearing strata in Moffat and Rio Blanco Counties, northwestern Colorado (Landis, 1959; Hornbaker and others, 1976). The field lies along the northwestern edge of the Piceance Creek basin near the Utah border. Significant coal deposits in the Lower White River field occur in the Mesaverda Group of Late Cretaceous age; original resources are estimated to be as much as 11,763 million short tons to a depth of 6000 feet (Hornbaker and others, 1976). A total of 13 samples of coal (10 core samples and 3 samples of drill cuttings) were collected from five drill holes in the northwestern part of the Lower White River field during exploratory drilling conducted by the US Geological Survey in 1976 (see Garrigues, 1976; Barnum and others, 1977). These samples represent several coal beds in the middle part of the Mesaverde Group. Table 1 gives brief descriptions of the samples; the general geology of the area and sample localities are shown in figure 2.

  1. EA-1812: Haxtun Wind Energy Project, Logan and Phillips County, Colorado

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of a proposal to authorize the expenditure of Federal funding through the Community Renewable Energy Deployment Program to Phillips County for design, permitting, and construction of an approximately 30-megawatt wind energy project, known as Haxtun Wind Project, within Phillips and Logan counties in northeastern Colorado. The proposed project consists of 18 wind turbines that would interconnect to the Highline Electric Cooperative equipment inside Western Area Power Administration's Haxtun substation just south of the Town of Haxtun.

  2. EIS-0450: TransWest Express Transmission Project; Wyoming, Colorado, Utah, and Nevada

    Broader source: Energy.gov [DOE]

    This EIS, prepared jointly by DOE's Western Area Power Administration and the Department of the Interior's Bureau of Land Management (Wyoming State Office), evaluates the potential environmental impacts of granting a right-of-way for the TransWest Express Transmission Project and amending a land use plan. The project consists of an overhead transmission line that would extend approximately 725 miles from south-central Wyoming, through Colorado and Utah. Western proposes to be a joint owner of the project.

  3. Colorado - Compare - U.S. Energy Information Administration (EIA)

    U.S. Energy Information Administration (EIA) Indexed Site

    Colorado Colorado

  4. Colorado - Rankings - U.S. Energy Information Administration (EIA)

    U.S. Energy Information Administration (EIA) Indexed Site

    Colorado Colorado

  5. Colorado - Search - U.S. Energy Information Administration (EIA)

    U.S. Energy Information Administration (EIA) Indexed Site

    Colorado Colorado

  6. Commercial-Scale Project Development and Finance Workshop Agenda and Presentations: Colorado

    Office of Energy Efficiency and Renewable Energy (EERE)

    Download the agenda and available presentations from guest speakers at the DOE Office of Indian Energy's Commercial-Scale Tribal Renewable Energy Project Development and Finance workshop held Sept. 1-3, 2015, at the National Renewable Energy Laboratory in Golden, Colorado.

  7. Environmental Assessment of Ground Water Compliance at the Durango, Colorado, UMTRA Project Site

    SciTech Connect (OSTI)

    N /A

    2002-11-29

    The U.S. Department of Energy (DOE) is proposing a ground water compliance strategy for the Uranium Mill Tailings Remedial Action (UMTRA) Project site near Durango, Colorado. DOE has prepared this environmental assessment to provide the public with information concerning the potential effects of this proposed strategy.

  8. Geologic report on the Sand Wash Drilling Project, Moffat and Routt Counties, Colorado

    SciTech Connect (OSTI)

    Carter, T.E.; Wayland, T.E.

    1981-09-01

    The Sand Wash Basin Drilling Project comprises twenty-seven (27) drill holes located in Moffat and Routt Counties, northwest Colorado, having an aggregate depth of 26,107.5 feet (7957.6 m). The holes penetrate the Browns Park Formation of Miocene age, which is a tuffaceous continental sandstone deposited in fluvial, eolian, and lacustrine environments. Partly based on project drilling results, uranium potential resource estimates for this formation in the $50/lb U/sub 3/O/sub 8/ forward-cost category have been increased by 34,476 tons U/sub 3/O/sub 8/ (35,036 metric tons). Three areas between Maybell and Craig, Colorado, considered favorable for uranium occurrences were verified as favorable by project drilling, and a fourth favorable area northwest of Maybell has been expanded. In addition, project drilling results indicate two new favorable areas, one north and northwest and one south of Steamboat Springs, Colorado. Anomalous radioactivity was detected in drill holes in all six study areas of the project. The most important factor in concentrating significant amounts of uranium in the target formation appears to be the availability of gaseous or liquid hydrocarbons and/or hydrogen sulfide gas as reductants. Where subjacent formations supply these reductants to the Browns Park Formation, project drilling encountered 0.05 percent to 0.01 percent uranium concentrations. Potential, though unproven, sources of these reductants are believed to underlie parts of all six project study areas.

  9. EIS-0390: Eastern Plains Transmission Project, Colorado and Kansas.

    Broader source: Energy.gov [DOE]

    This EIS is for Western Area Power Administration's proposal to participate with Tri-State Generation and Transmission Association, Inc. (Tri-State), to construct the proposed Eastern Plains Transmission Project (Project). Western’s participation with Tri-State would be in exchange for capacity rights on the transmission lines.

  10. Lower Rio Grande Valley transboundary air pollution project (TAPP). Project report 1996--1997

    SciTech Connect (OSTI)

    Mukerjee, S.; Shadwick, D.S.; Dean, K.E.; Carmichael, L.Y.; Bowser, J.J.

    1999-04-01

    The Lower Rio Grande Valley Transboundary Air Pollution Project (TAPP) was a US-Mexico Border XXI project to find out if air pollutants were moving across the border from Mexico into the Lower Rio Grande Valley of Texas and to see what levels of air pollutants were present. Ambient measurements and meteorology were collected data for a year (March 1996-March 1997) at three fixed sites in and near Brownsville, Texas very close to the US-Mexico border on a continuous and 24-h internal basis. Overall levels of air pollution were similar to or lower than other areas in Texas and elsewhere. Based on wind sector analyses, transport of air pollution across the border did not appear to adversely impact air quality on the US side of the Valley. Southeasterly winds from the Gulf of Mexico were largely responsible for the clean air conditions.

  11. EA-0930: Facility Operations at the U.S. DOE Grand Junction Projects Office, Grand Junction, Colorado

    Office of Energy Efficiency and Renewable Energy (EERE)

    This EA evaluates the environmental impacts of the proposal to expand and upgrade the U.S. Department of Energy's Grand Junction Projects Office facilities and operations in Grand Junction, Colorado.

  12. Colorado: Energy Modeling Products Support Energy Efficiency Projects

    Broader source: Energy.gov [DOE]

    Xcel Energy, a Minnesota-based utility that supplies electricity and natural gas to eight states, employed two EERE-developed products in developing a program management tool for its Energy Design Assistance (EDA) program. Through EDA, Xcel provides energy consulting services to construction projects to encourage efficient energy use.

  13. DOE - Office of Legacy Management -- Rio

    Office of Legacy Management (LM)

    Other Documents Rio Blanco Site Environmental Management End State ... Rio Blanco Underground Nuclear Test Site, Colorado ... Please see the Privacy and Security page for more ...

  14. UMTRA project water sampling and analysis plan, Naturita, Colorado. Revision 1

    SciTech Connect (OSTI)

    1995-09-01

    Planned, routine ground water sampling activities for calendar year 1995 to 1997 at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site near Naturita, Colorado, are described in this water sampling and analysis plan. The following plan identifies and justifies the sampling locations, analytical parameters, detection limits, sampling frequency, and specific rationale for each routine monitoring station at the site. The regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from the US Environmental Protection Agency (EPA) regulations in 40 CFR Part 192. Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site.

  15. UMTRA Project water sampling and analysis plan, Grand Junction, Colorado. Revision 1, Version 6

    SciTech Connect (OSTI)

    1995-09-01

    This water sampling and analysis plan describes the planned, routine ground water sampling activities at the Grand Junction US DOE Uranium Mill Tailings Remedial Action (UMTRA) Project site (GRJ-01) in Grand Junction, Colorado, and at the Cheney Disposal Site (GRJ-03) near Grand Junction. The plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequencies for the routine monitoring stations at the sites. Regulatory basis is in the US EPA regulations in 40 CFR Part 192 (1994) and EPA ground water quality standards of 1995 (60 FR 2854). This plan summarizes results of past water sampling activities, details water sampling activities planned for the next 2 years, and projects sampling activities for the next 5 years.

  16. Surface and subsurface cleanup protocol for radionuclides, Gunnison, Colorado, UMTRA project processing site. Final [report

    SciTech Connect (OSTI)

    Not Available

    1993-09-01

    Surface and subsurface soil cleanup protocols for the Gunnison, Colorado, processing sits are summarized as follows: In accordance with EPA-promulgated land cleanup standards (40 CFR 192), in situ Ra-226 is to be cleaned up based on bulk concentrations not exceeding 5 and 15 pCi/g in 15-cm surface and subsurface depth increments, averaged over 100-m{sup 2} grid blocks, where the parent Ra-226 concentrations are greater than, or in secular equilibrium with, the Th-230 parent. A bulk interpretation of these EPA standards has been accepted by the Nuclear Regulatory Commission (NRC), and while the concentration of the finer-sized soil fraction less than a No. 4 mesh sieve contains the higher concentration of radioactivity, the bulk approach in effect integrates the total sample radioactivity over the entire sample mass. In locations where Th-230 has differentially migrated in subsoil relative to Ra-226, a Th-230 cleanup protocol has been developed in accordance with Supplemental Standard provisions of 40 CFR 192 for NRC/Colorado Department of Health (CDH) approval for timely implementation. Detailed elements of the protocol are contained in Appendix A, Generic Protocol from Thorium-230 Cleanup/Verification at UMTRA Project Processing Sites. The cleanup of other radionuclides or nonradiological hazards that pose a significant threat to the public and the environment will be determined and implemented in accordance with pathway analysis to assess impacts and the implications of ALARA specified in 40 CFR 192 relative to supplemental standards.

  17. Environmental Assessment of Ground Water Compliance at the Gunnison, Colorado, UMTRA Project Site

    SciTech Connect (OSTI)

    N /A

    2002-08-13

    The U.S. Department of Energy (DOE) is in the process of selecting a ground water compliance strategy for the Gunnison, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project site. This Environmental Assessment (EA) discusses two alternatives and the effects associated with each. The two alternatives are (1) natural flushing coupled with institutional controls and continued monitoring and (2) no action. The compliance strategy must meet U.S. Environmental Protection Agency (EPA) ground water standards defined in Title 40 ''Code of Federal Regulations'' Part 192, Subpart B, in areas where ground water beneath and around the site is contaminated as a result of past milling operations. It has been determined that contamination in the ground water at the Gunnison site consists of soluble residual radioactive material (RRM) as defined in the Uranium Mill Tailings Radiation Control Act (UMTRCA).

  18. Solar Technology Acceleration Center (SolarTAC): Solar Resource & Meteorological Assessment Project (SOLRMAP); Aurora, Colorado (Data)

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Wilcox, S.; Andreas, A.

    Located in Colorado, near Denver International Airport, SolarTAC is a private, member-based, 74-acre outdoor facility where the solar industry tests, validates, and demonstrates advanced solar technologies. SolarTAC was launched in 2008 by a public-private consortium, including Midwest Research Institute (MRI). As a supporting member of SolarTAC, the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) has established a high quality solar and meteorological measurement station at this location. This Solar Resource and Meteorological Assessment Project (SOLRMAP) provides high quality measurements to support deployment of power projects in the United States. The no-funds-exchanged collaboration brings NREL solar resource assessment expertise together with industry needs for measurements. The end result is high quality data sets to support the financing, design, and monitoring of large scale solar power projects for industry in addition to research-quality data for NREL model development. NREL provides consultation for instrumentation and station deployment, along with instrument calibrations, data acquisition, quality assessment, data distribution, and summary reports. Industry participants provide equipment, infrastructure, and station maintenance.

  19. Solar Technology Acceleration Center (SolarTAC): Solar Resource & Meteorological Assessment Project (SOLRMAP); Aurora, Colorado (Data)

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Wilcox, S.; Andreas, A.

    2011-02-11

    Located in Colorado, near Denver International Airport, SolarTAC is a private, member-based, 74-acre outdoor facility where the solar industry tests, validates, and demonstrates advanced solar technologies. SolarTAC was launched in 2008 by a public-private consortium, including Midwest Research Institute (MRI). As a supporting member of SolarTAC, the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) has established a high quality solar and meteorological measurement station at this location. This Solar Resource and Meteorological Assessment Project (SOLRMAP) provides high quality measurements to support deployment of power projects in the United States. The no-funds-exchanged collaboration brings NREL solar resource assessment expertise together with industry needs for measurements. The end result is high quality data sets to support the financing, design, and monitoring of large scale solar power projects for industry in addition to research-quality data for NREL model development. NREL provides consultation for instrumentation and station deployment, along with instrument calibrations, data acquisition, quality assessment, data distribution, and summary reports. Industry participants provide equipment, infrastructure, and station maintenance.

  20. Site observational work plan for the UMTRA Project Site at Grand Junction, Colorado

    SciTech Connect (OSTI)

    1996-03-01

    The U.S. Department of Energy (DOE) has prepared this initial site observational work plan (SOWP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project site in Grand Junction, Colorado. This SOWP is one of the first UMTRA Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards (40 CFR Part 192, as amended by 60 FR 2854) for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement (PEIS). This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The DOE goal is to use the observational method to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation based on the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards.

  1. Final audit report of remedial action construction at the UMTRA Project, Grand Junction, Colorado, processing site

    SciTech Connect (OSTI)

    1995-02-01

    This final audit report (FAR) for remedial action at the Grand Junction, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project processing site consists of a summary of the radiological surveillances/ audits, the quality assurance (QA) in-process surveillances, and the QA final close-out inspection performed by the US Department of Energy (DOE) and Technical Assistance Contractor (TAC). The FAR also summarizes other surveillances performed by the US Nuclear Regulatory Commission (NRC). To summarize, a total of one finding and 127 observations were noted during DOE/TAC audit and surveillance activities. The NRC noted general site-related observations during the OSCRs. Follow-up to responses required from MK-Ferguson for the DOE/TAC finding and observations indicated that all issues related to the Grand Junction processing site were resolved and closed out to the DOE`s satisfaction. The NRC OSCRs resulted in no issues related to the Grand Junction processing site requiring a response from MK-Ferguson.

  2. Weld County, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Colorado Hudson, Colorado Johnstown, Colorado Keenesburg, Colorado Kersey, Colorado La Salle, Colorado Lochbuie, Colorado Longmont, Colorado Mead, Colorado Milliken, Colorado...

  3. Sidney-North Yuma 230-kV Transmission Line Project, Colorado and Nebraska

    SciTech Connect (OSTI)

    Not Available

    1991-06-01

    This report describes the need for a 230-kV overhead transmission line to supply power from Sidney, Nebraska to eastern Colorado. The alternative scenario compared to construction of the line is No Action. Rejected alternatives include underground lines and different routing paths, with a possible extension to the Sterling area. Both scenarios are evaluated for environmental effects, cost, and consequences for the eastern Colorado region. The proposed route is determined to be the environmentally preferred choice. 120 refs., 6 figs., 13 tabs. (MHB)

  4. Annual report on the U.S. Department of Energy`s cultural resource activities at Colorado UMTRA Project sites for October 1995--September 1996

    SciTech Connect (OSTI)

    1996-09-01

    This report summarizes the results of cultural resource activities conducted by the U.S. Department of Energy (DOE) at Uranium Mill Tailings Remedial Action (UMTRA) Project sites in Colorado for the period of October 1, 1995 through September 30, 1996. The inactive uranium mill tailings sites in Colorado are at Durango, Grand Junction, Gunnison, Maybell, Naturita, Rifle, and Slick Rock. On December 6, 1984, the DOE, the Advisory Council on Historic Preservation, and the Colorado State Historic Preservation Officer (SHPO) entered into a programmatic memorandum of understanding (PMOU). This PMOU requires the DOE to fulfillment of its obligations under various state and federal regulations for the protection and preservation of cultural resources. This report provides the state of Colorado with an annual report on the cultural resource activities performed for all UMTRA Project sites in Colorado. Due to the completion of surface activities at the UMTRA Project sites, this will be the last annual report to the state of Colorado. Cultural resources activities subsequent to this report will be reported to the state through site-specific correspondence.

  5. Savery Project, preference right coal lease applications, Carbon County, State of Wyoming, Moffat and Routt counties, State of Colorado

    SciTech Connect (OSTI)

    Not Available

    1982-11-01

    An abstract of the draft environmental impact statement (EIS) describes a rejected mining plan of the Gulf Oil Corp. to remove subsurface coal in Wyoming, with tunneling under the Little Snake River into Colorado. Rejection by the Federal Energy Regulatory Commission will permit competitive leasing on neighboring tracts, which would have become undervalued if the proposed plan were to proceed. This would have had negative economic and social impacts on the surrounding area. A negative impact from the rejection is the loss of employment and the unmined coal associated with the project. The Federal Coal Leasing Amendments Act of 1975 and the Mineral Leasing Act of 1920 provide legal mandates for the EIS.

  6. EA-2018: Front Range-Midway Solar Interconnection Project; El Paso County, Colorado

    Office of Energy Efficiency and Renewable Energy (EERE)

    Public Comment Period Ends: 08/19/2016 Western Area Power Administration is preparing an EA that analyzes the potential environmental impacts of interconnecting a proposed photovoltaic solar facility adjacent to Western’s existing Midway Substation in El Paso County, Colorado.

  7. DOE - Office of Legacy Management -- Rio

    Office of Legacy Management (LM)

    Colorado Rio Blanco, Colorado, Site A Nevada Offsite rioblanco_map The DOE Office of Legacy Management assumed responsibility for long-term surveillance and maintenance at the Rio Blanco site in 2008. The Rio Blanco site requires monitoring of nearby natural gas wells, groundwater wells, and surface water locations; routine inspection and maintenance; records-related activities; and stakeholder support. For more information about the Rio Blanco site, view the fact sheet. Site Documents and Links

  8. EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado

    Office of Energy Efficiency and Renewable Energy (EERE)

    Western Area Power Administration (Western) – with USDA Forest Service, Arapaho and Roosevelt National Forest, as a cooperating agency – is preparing an EIS that analyzes the potential environmental impacts of a proposal to rebuild and upgrade two 115-kilovolt single-circuit transmission lines between the Flatiron Substation and the intersection of Mall Road and U.S. Highway 36 in Estes Park, Larimer County, Colorado.

  9. Larimer County, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Colorado Fort Collins, Colorado Johnstown, Colorado Laporte, Colorado Loveland, Colorado Red Feather Lakes, Colorado Timnath, Colorado Wellington, Colorado Windsor, Colorado...

  10. Boulder County, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Colorado Boulder, Colorado Eldora, Colorado Eldorado Springs, Colorado Erie, Colorado Gold Hill, Colorado Gunbarrel, Colorado Jamestown, Colorado Lafayette, Colorado Longmont,...

  11. EA-2008: Colorado River Storage Project Programmatic Operations and Maintenance Project; Coconino, Maricopa, Navajo, and Yavapai Counties (Arizona) and San Juan County (Utah)

    Broader source: Energy.gov [DOE]

    Western Area Power Administration is preparing an EA that assesses the potential environmental impacts of Western’s programmatic operations and management (O&M) process and an integrated vegetation management (IVM) program on the Colorado River Storage Project System. O&M activities would consist of aerial and ground patrols, regular and preventive maintenance, inspections and repairs, and road repair. The IVM program would remove vegetation to protect facilities from fire, control the spread of noxious weeds to protect environmental quality, establish and maintain stable, low-growing plant communities in the ROW, and activities for public and worker safety around transmission lines and other facilities.

  12. DOE/EA-2008: Colorado River Storage Project Programmatic Operations and Maintenance Project; Coconino, Maricopa, Navajo, and Yavapai Counties (Arizona) and San Juan County (Utah)

    Broader source: Energy.gov [DOE]

    Western Area Power Administration is preparing an EA that assesses the potential environmental impacts of Westerns programmatic operations and management (O&M) process and an integrated vegetation management (IVM) program on the Colorado River Storage Project System. O&M activities would consist of aerial and ground patrols, regular and preventive maintenance, inspections and repairs, and road repair. The IVM program would remove vegetation to protect facilities from fire, control the spread of noxious weeds to protect environmental quality, establish and maintain stable, low-growing plant communities in the ROW, and activities for public and worker safety around transmission lines and other facilities.

  13. Southern Colorado Plateau Geothermal Region | Open Energy Information

    Open Energy Info (EERE)

    Home Southern Colorado Plateau Geothermal Region Details Areas (0) Power Plants (0) Projects (0) Techniques (0) Map: Name "The Colorado Plateau is a high...

  14. Environmental monitoring report on the US Department of Energy's Grand Junction Projects Office facility, Grand Junction, Colorado, for calendar year 1987

    SciTech Connect (OSTI)

    Not Available

    1988-05-01

    This report presents results of environmental monitoring activities conducted in 1987 at the US Department of Energy's (DOE) Grand Junction Projects Office (GJPO) Facility in Colorado. The site is included under the DOE's Defense Decontamination and Decommissioning (Defense D and D) Program.

  15. Screening Assessment of Potential Human-Health Risk from Future Natural-Gas Drilling Near Project Rulison in Western Colorado

    SciTech Connect (OSTI)

    Daniels Jeffrey I.,Chapman Jenny B.

    2012-01-01

    The Project Rulison underground nuclear test was conducted in 1969 at a depth of 8,400 ft in the Williams Fork Formation of the Piceance Basin, west-central Colorado (Figure 1). The U.S. Department of Energy Office of Legacy Management (LM) is the steward of the site. Their management is guided by data collected from past site investigations and current monitoring, and by the results of calculations of expected behavior of contaminants remaining in the deep subsurface. The purpose of this screening risk assessment is to evaluate possible health risks from current and future exposure to Rulison contaminants so the information can be factored into LM's stewardship decisions. For example, these risk assessment results can inform decisions regarding institutional controls at the site and appropriate monitoring of nearby natural-gas extraction activities. Specifically, the screening risk analysis can provide guidance for setting appropriate action levels for contaminant monitoring to ensure protection of human health.

  16. Environmental assessment of facility operations at the U.S. Department of Energy Grand Junction Projects Office, Grand Junction, Colorado

    SciTech Connect (OSTI)

    1996-06-01

    The US Department of Energy (DOE) has prepared a sitewide environmental assessment (EA) of the proposed action to continue and expand present-day activities on the DOE Grand Junction Projects Office (GJPO) facility in Grand Junction, Colorado. Because DOE-GJPO regularly proposes and conducts many different on-site activities, DOE decided to evaluate these activities in one sitewide EA rather than in multiple, activity-specific documents. On the basis of the information and analyses presented in the EA, DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment, as defined by the National Environmental Policy Act (NEPA) of 1969. Therefore, preparation of an environmental impact statement is not required for facility operations, and DOE is issuing this Finding of No Significant Impact (FONSI).

  17. DOE - Office of Legacy Management -- Colorado

    Office of Legacy Management (LM)

    Colorado Colorado 2014co Durango Sites (2) Grand Junction Sites (3) Gunnison Sites (2) Maybell Site Maybell West Site Naturita Sites (2) Rifle Sites (3) Rio Blanco Site Rocky Flats Site Rulison Site Slick Rock Sites (2) Last Updated: 12/15/2015

  18. MHK Projects/Colorado River Indian Tribes IRR DI | Open Energy...

    Open Energy Info (EERE)

    Organization Marine Power Water Inc Project Licensing FERC License Docket Number P-13350 Environmental Monitoring and Mitigation Efforts See Tethys << Return to the MHK database...

  19. Advanced Secondary Recovery Project for the Sooner ''D'' Sand Unit, Weld County, Colorado

    SciTech Connect (OSTI)

    Sippel, Mark A.

    1996-07-01

    The objective of this project is to increase production from the Cretaceous D Sandstone in the Denver-Julesburg (D-J) Basin through geologically targeted infill drilling and improved reservoir management of waterflood operations. This project involves multi-disciplinary reservoir characterization using high-density 3D seismic, detailed stratigraphy and reservoir simulation studies. Infill drilling, water-injection conversion and re-completing some wells to add short-radius laterals will be based on the results of the reservoir characterization studies. Production response will be evaluated using reservoir simulation and production tests. Technology transfer will utilize workshops, presentations and technical papers which will emphasize the economic advantages of implementing the demonstrated technologies. The success of this project and effective technology transfer should prompt-reappraisal of older waterflood projects and implementation of new projects in oil provinces such as the D-J Basin.

  20. Geothermal Prospects in Colorado

    Broader source: Energy.gov [DOE]

    Geothermal Prospects in Colorado presentation at the April 2013 peer review meeting held in Denver, Colorado.

  1. Final Environmental Assessment and Finding of No Significant Impact: Ground Water Compliance at the Slick Rock, Colorado, UMTRA Project Site

    SciTech Connect (OSTI)

    N /A

    2003-03-13

    This environmental assessment addresses the environmental effects of a proposed action and the no action alternative to comply with U.S. Environmental Protection Agency (EPA) ground water standards at the Slick Rock, Colorado, Uranium Mill Tailings Remedial Action Project sites. The sites consist of two areas designated as the North Continent (NC) site and the Union Carbide (UC) site. In 1996, the U.S. Department of Energy (DOE) completed surface cleanup at both sites and encapsulated the tailings in a disposal cell 5 miles east of the original sites. Maximum concentration limits (MCLs) referred to in this environmental assessment are the standards established in Title 40 ''Code of Federal Regulations'' Part 192 (40 CFR 192) unless noted otherwise. Ground water contaminants of potential concern at the NC site are uranium and selenium. Uranium is more prevalent, and concentrations in the majority of alluvial wells at the NC site exceed the MCL of 0.044 milligram per liter (mg/L). Selenium contamination is less prevalent; samples from only one well had concentrations exceeding the MCL of 0.01 mg/L. To achieve compliance with Subpart B of 40 CFR 192 at the NC site, DOE is proposing the strategy of natural flushing in conjunction with institutional controls and continued monitoring. Ground water flow and transport modeling has predicted that concentrations of uranium and selenium in the alluvial aquifer will decrease to levels below their respective MCLs within 50 years.

  2. Advanced secondary recovery project for the Sooner D Sand Unit, Weld County, Colorado: Final report

    SciTech Connect (OSTI)

    Sippel, M.A.; Cammon, T.J.

    1986-06-01

    The objective of this project was to increase production at the Sooner D Sand Unit through geologically targeted infill drilling and improved reservoir management of waterflood operations. The Sooner D Sand Unit demonstration project should be an example for other operators to follow for reservoir characterization and exploitation methodologies to increase production by waterflood from the Cretaceous D Sandstone in the Denver-Julesburg (D-J) Basin. This project involved multi-disciplinary reservoir characterization using high-density 3D seismic, detailed stratigraphy and reservoir simulation studies. Infill drilling, water-injection conversion and re-completing some wells to add short-radius laterals were based on the results of the reservoir characterization studies. Production response were evaluated using reservoir simulation and production tests. Technology transfer utilized workshops, presentations and technical papers which emphasized the economic advantages of implementing the demonstrated technologies.

  3. Solar Resource & Meteorological Assessment Project (SOLRMAP): Sun Spot Two; Swink, Colorado (Data)

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Wilcox, S.; Andreas, A.

    2010-11-10

    The U.S. Department of Energy's National Renewable Energy Laboratory collaborates with the solar industry to establish high quality solar and meteorological measurements. This Solar Resource and Meteorological Assessment Project (SOLRMAP) provides high quality measurements to support deployment of power projects in the United States. The no-funds-exchanged collaboration brings NREL solar resource assessment expertise together with industry needs for measurements. The end result is high quality data sets to support the financing, design, and monitoring of large scale solar power projects for industry in addition to research-quality data for NREL model development. NREL provides consultation for instrumentation and station deployment, along with instrument calibrations, data acquisition, quality assessment, data distribution, and summary reports. Industry participants provide equipment, infrastructure, and station maintenance.

  4. Solar Resource & Meteorological Assessment Project (SOLRMAP): Sun Spot Two; Swink, Colorado (Data)

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Wilcox, S.; Andreas, A.

    The U.S. Department of Energy's National Renewable Energy Laboratory collaborates with the solar industry to establish high quality solar and meteorological measurements. This Solar Resource and Meteorological Assessment Project (SOLRMAP) provides high quality measurements to support deployment of power projects in the United States. The no-funds-exchanged collaboration brings NREL solar resource assessment expertise together with industry needs for measurements. The end result is high quality data sets to support the financing, design, and monitoring of large scale solar power projects for industry in addition to research-quality data for NREL model development. NREL provides consultation for instrumentation and station deployment, along with instrument calibrations, data acquisition, quality assessment, data distribution, and summary reports. Industry participants provide equipment, infrastructure, and station maintenance.

  5. Colorado - C.R.S. 24-38.5-108, Colorado Energy Office-State Agency...

    Open Energy Info (EERE)

    Colorado - C.R.S. 24-38.5-108, Colorado Energy Office-State Agency Coordination of Review of Federal License and Exemption Applications for Hydroelectric Energy Projects Jump to:...

  6. EERE Success Story—Colorado: Energy Modeling Products Support Energy Efficiency Projects

    Broader source: Energy.gov [DOE]

    Xcel Energy, a Minnesota-based utility that supplies electricity and natural gas to eight states, employed two EERE-developed products in developing a program management tool for its Energy Design Assistance (EDA) program. Through EDA, Xcel provides energy consulting services to construction projects to encourage efficient energy use.

  7. Surface and subsurface cleanup protocol for radionuclides Gunnison, Colorado, UMTRA Project Processing Site. Revision 3, Final report

    SciTech Connect (OSTI)

    Not Available

    1994-05-01

    The supplemental standards provisions of Title 40, Code of Federal Regulations, Part 192 (40 CFR Part 192) require the cleanup of radionuclides other than radium-226 (Ra-226) to levels ``as low as reasonably achievable`` (ALARA), taking into account site-specific conditions, if sufficient quantities and concentrations are present to constitute a significant radiation hazard. In this context, thorium-230 (Th-230) at the Gunnison, Colorado, processing site will require remediation. However, a seasonally fluctuating groundwater table at the site significantly complicates conventional remedial action with respect to cleanup. Characterization data indicate that in the offpile areas, the removal of residual in situ bulk Ra-226 and Th-230 such that the 1000-year projected Ra-226 concentration (Ra-226 concentration in 1000 years due to the decay of in situ Ra-226 and the in-growth of Ra-226 from in situ Th-230) complies with the US Environmental Protection Agency (EPA) cleanup standard for in situ Ra-226 and the cleanup protocol for in situ Th-230 can be readily achieved using conventional excavation techniques for bulk contamination without encountering significant impacts due to groundwater. The EPA cleanup standard and criterion for Ra-226 and the 1000-year projected Ra-226 are 5 and 15 picocuries per gram (pCi/g) above background, respectively, averaged over 15-centimeter (cm) deep surface and subsurface intervals and 100-square-meter (m{sup 2}) grid areas. Significant differential migration of Th-230 relative to Ra-226 has occurred over 40 percent of the subpile area. To effectively remediate the site with respect to Ra-226 and Th-230, supplemental standard is proposed and discussed in this report.

  8. Western Gas Sands Project: production histories of the Piceance and Uinta basins of Colorado and Utah

    SciTech Connect (OSTI)

    Anderson, S.; Kohout, J.

    1980-11-20

    Current United States geological tight sand designations in the Piceance and Uinta Basins' Western Gas Sands Project include the Mesaverde Group, Fort Union and Wasatch Formations. Others, such as the Dakota, Cedar Mountain, Morrison and Mancos may eventually be included. Future production from these formations will probably be closely associated with existing trends. Cumulative gas production through December 1979, of the Mesaverde Group, Fort Union and Wasatch Formations in the Piceance and Uinta Basins is less than 275 billion cubic feet. This contrasts dramatically with potential gas in place estimates of 360 trillion cubic feet. If the geology can be fully understood and engineering problems surmounted, significant potential reserves can be exploited.

  9. Site observational work plan for the UMTRA project site at Grand Junction, Colorado

    SciTech Connect (OSTI)

    1996-01-01

    This site observational work plan (SOWP) is one of the first Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement. This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The US Department of Energy (DOE) goal is to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation with the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards. The conceptual model demonstrates that the uranium processing-related contamination at the site has affected the unconfined alluvial aquifer, but not the deeper confined aquifer.

  10. Douglas County, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Estates, Colorado Highlands Ranch, Colorado Larkspur, Colorado Littleton, Colorado Lone Tree, Colorado Louviers, Colorado Meridian, Colorado Parker, Colorado Perry Park, Colorado...

  11. Colorado oil shale development on policy and impact mitigation plan. Final report, March 31, 1980-November 30, 1982

    SciTech Connect (OSTI)

    Not Available

    1984-01-01

    The impacts of accelerated oil shale development in four northwestern Colorado counties, Moffat, Rio Blanco, Mesa, and Garfield are being monitored and managed through a grant to the Colorado Department of Highways.

  12. Colorado Energy Office: Colorado Small Hydropower Handbook |...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Colorado Energy Office: Colorado Small Hydropower HandbookPermitting...

  13. Rio do Lobo Energia | Open Energy Information

    Open Energy Info (EERE)

    Lobo Energia Jump to: navigation, search Name: Rio do Lobo Energia Place: Erechim, Rio Grande do Sul, Brazil Sector: Hydro Product: Brazilian based small hydro project company,...

  14. Desert Peak EGS Project

    Broader source: Energy.gov [DOE]

    Desert Peak EGS Project presentation at the April 2013 peer review meeting held in Denver, Colorado.

  15. Commercial-Scale Renewable Energy Project Development Workshop...

    Energy Savers [EERE]

    Workshop: Colorado Commercial-Scale Renewable Energy Project Development Workshop: Colorado July 29, 2014 - 9:52am Addthis July 29-31, 2014 Golden, Colorado National Renewable ...

  16. DE-EE0005690 Developing Solar Friendly Communities Colorado Solar...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EE0005690 Developing Solar Friendly Communities Colorado Solar Energy Industries ... A. PROJECT OBJECTIVES The goal of the Solar Friendly Communities project is to achieve ...

  17. Microbiological, Geochemical and Hydrologic Processes Controlling Uranium Mobility: An Integrated Field-Scale Subsurface Research Challenge Site at Rifle, Colorado, Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Fix, N. J.

    2008-01-07

    The U.S. Department of Energy (DOE) is cleaning up and/or monitoring large, dilute plumes contaminated by metals, such as uranium and chromium, whose mobility and solubility change with redox status. Field-scale experiments with acetate as the electron donor have stimulated metal-reducing bacteria to effectively remove uranium [U(VI)] from groundwater at the Uranium Mill Tailings Site in Rifle, Colorado. The Pacific Northwest National Laboratory and a multidisciplinary team of national laboratory and academic collaborators has embarked on a research proposed for the Rifle site, the object of which is to gain a comprehensive and mechanistic understanding of the microbial factors and associated geochemistry controlling uranium mobility so that DOE can confidently remediate uranium plumes as well as support stewardship of uranium-contaminated sites. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Rifle Integrated Field-Scale Subsurface Research Challenge Project.

  18. Rio Grande

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Rio Grande Rio Grande In New Mexico, the Rio Grande flows from one sediment-filled basin to another, cutting canyons between the basins and supporting a fragile ecosystem on its...

  19. EIS-0477: San Juan Basin Energy Connect Project, San Juan County, New Mexico and La Plata County, Colorado

    Broader source: Energy.gov [DOE]

    The Department of the Interior’s Bureau of Land Management is preparing an EIS to evaluate the potential environmental impacts of a proposal to construct a 230-kilovolt transmission line from the Farmington area in northwest New Mexico to Ignacio, Colorado, to relieve transmission constraints, serve new loads, and offer economic development through renewable energy development in the San Juan Basin. DOE’s Western Area Power Administration is a cooperating agency; the proposed transmission line would require an interconnection with Western's Shiprock Substation, near Farmington, and a new Three Rivers Substation on Western's reserved lands.

  20. Rio Blanco, Colorado, Site Fact Sheet

    Office of Legacy Management (LM)

    test in partnership with CER Geonuclear Corporation and Continental Oil Company (Conoco). ... The principal land uses in the area are livestock grazing and recreation; oil and gas ...

  1. Green Colorado Credit Reserve

    Broader source: Energy.gov [DOE]

    The Green Colorado Credit Reserve (GCCR) is a loan loss reserve that was created by the Colorado Energy Office (CEO) to incentivize private lenders in Colorado to make small commercial loans up to ...

  2. Colorado: Colorado's Clean Energy Resources and Economy

    SciTech Connect (OSTI)

    2013-03-15

    This document highlights the Office of Energy Efficiency and Renewable Energy's investments and impacts in the state of Colorado.

  3. Colorado School of Mines 2014 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Colorado School of Mines 2014 Colorado School of Mines 2014 Back row: Alex Dell, Zachary Weber, Aaron Troyer, Cabe Bonner, Jeremy Webb. Front row: Katherine Rooney, Jyotsana Gandhi, Kevin Tan, Kelsey Wokasch. Photo from Colorado School of Mines. Back row: Alex Dell, Zachary Weber, Aaron Troyer, Cabe Bonner, Jeremy Webb. Front row: Katherine Rooney, Jyotsana Gandhi, Kevin Tan, Kelsey Wokasch. Photo from Colorado School of Mines. Project Description Named after the Greek god of the west wind, Team

  4. Colorado School of Mines - Colorado Energy Research Institute...

    Open Energy Info (EERE)

    Mines - Colorado Energy Research Institute Jump to: navigation, search Name: Colorado School of Mines - Colorado Energy Research Institute Address: 1500 Illinois Street Place:...

  5. City of Colorado Springs, Colorado (Utility Company) | Open Energy...

    Open Energy Info (EERE)

    from Colorado Springs Utilities) Jump to: navigation, search Name: Colorado Springs City of Place: Colorado Phone Number: 719-448-4800 Website: www.csu.orgPagesresidential....

  6. Eagle County, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Colorado Edwards, Colorado El Jebel, Colorado Gypsum, Colorado Minturn, Colorado Red Cliff, Colorado Vail, Colorado Retrieved from "http:en.openei.orgw...

  7. Las Animas County, Colorado: Energy Resources | Open Energy Informatio...

    Open Energy Info (EERE)

    in Las Animas County, Colorado Aguilar, Colorado Branson, Colorado Cokedale, Colorado Kim, Colorado Starkville, Colorado Trinidad, Colorado Retrieved from "http:en.openei.org...

  8. Rio Grande

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Rio Grande Rio Grande In New Mexico, the Rio Grande flows from one sediment-filled basin to another, cutting canyons between the basins and supporting a fragile ecosystem on its flood plain. August 1, 2013 river bank Banks of the Rio Grande Groundwater at LANL discharges to springs along the Rio Grande. Stream flow resulting from heavy storms and snowmelt also has the potential to reach the Rio Grande. RELATED IMAGES http://farm3.staticflickr.com/2818/9628464665_3a972e1387_t.jpg Enlarge

  9. Uinta Arch Project: investigations of uranium potential in Precambrian X and older metasedimentary rocks in the Unita and Wasatch ranges, Utah and Colorado

    SciTech Connect (OSTI)

    Graff, P.J.; Sears, J.W.; Holden, G.S.

    1980-06-01

    This study is part of the United States Department of Energy's National Uranium Resource Evaluation Program to understand the geologic setting, amount, and availability of uranium resources within the boundaries of the United States. The systematic study of Precambrian quartz-pebble conglomerates and areas that may contain such conglomerates is an integral part of DOE's resource evaluation program, because deposits of world-wide importance occur in such terrains in Canada and South Africa, and because terrains similar to those producing uranium from quartz-pebble conglomerates exist elsewhere in the United States. Because of the ready availability of Tertiary sandstone and Colorado Plateau-type uranium deposits, large areas of Precambrian rocks in the US have not been fully assessed for uranium potential. Thus, the Uinta Arch Project was undertaken to assess the favorability of Precambrian metasedimentary rocks in northern Utah for deposits of uranium in Precambrian quartz-pebble conglomerates. Rocks of interest to this study are the thick, clastic sequences within the Uinta Arch that are considered to be of Early Proterozoic age. The Uinta Arch area is known to contain rocks which generally fit the lithologic characteristics that are understood to limit the occurrence of Precambrian fossil placers. However, detailed geology of these rocks and their exact fit to the model described for uraniferous conglomerates was not known. The primary goal of the Uinta Arch Project was to determine how well these Precambrian rocks resemble known deposits and to describe the favorability of placer uranium deposits.

  10. DOE and Colorado Mesa University Education Agreement Expands...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Addthis Related Articles News Release: Energy Department Signs Option and Lease for Durango Solar Project Preservationists Tour Historic Log Cabin at the Grand Junction, Colorado, ...

  11. Saguache County, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Places in Saguache County, Colorado Bonanza, Colorado Center, Colorado Crestone, Colorado Moffat, Colorado Saguache, Colorado Retrieved from "http:en.openei.orgw...

  12. Prowers County, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    County, Colorado Granada, Colorado Hartman, Colorado Holly, Colorado Lamar, Colorado Wiley, Colorado Retrieved from "http:en.openei.orgwindex.php?titleProwersCounty,Color...

  13. Biofuels of Colorado LLC | Open Energy Information

    Open Energy Info (EERE)

    of Colorado LLC Jump to: navigation, search Name: Biofuels of Colorado LLC Place: Denver, Colorado Zip: 80216 Product: Biodiesel producer in Denver, Colorado. References: Biofuels...

  14. University of Colorado | Open Energy Information

    Open Energy Info (EERE)

    Colorado Jump to: navigation, search Name: University of Colorado Place: Boulder, Colorado Zip: 80309 Product: A public university in Colorado. Coordinates: 42.74962,...

  15. Colorado Ground Water Commission | Open Energy Information

    Open Energy Info (EERE)

    Colorado Ground Water Commission Jump to: navigation, search Name: Colorado Ground Water Commission Place: Colorado Website: water.state.co.usgroundwater References: Colorado...

  16. BLM Colorado State Office | Open Energy Information

    Open Energy Info (EERE)

    Colorado State Office Jump to: navigation, search Logo: BLM Colorado State Office Name: BLM Colorado State Office Abbreviation: Colorado Address: 2850 Youngfield Street Place:...

  17. Recovery Act State Memos Colorado

    Broader source: Energy.gov (indexed) [DOE]

    Colorado For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  18. Uranium Mining and Milling near Rifle, Colorado | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Uranium Mining and Milling near Rifle, Colorado Uranium Mining and Milling near Rifle, Colorado April 19, 2016 - 4:42pm Addthis What does this project do? Goal 1. Protect Human Health and the Environment The small town of Rifle, Colorado, has an interesting history related to uranium and vanadium production. A mineral found near Rifle, called roscolite, contains both vanadium and uranium but was originally mined and milled for its vanadium content. Union Carbide Corporation began milling the ore

  19. Rio Grande

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    In New Mexico, the Rio Grande flows from one sediment-filled basin to another, cutting canyons between the basins and supporting a fragile ecosystem on its flood plain. August 1, ...

  20. Colorado, Processing Sites

    Office of Legacy Management (LM)

    Old and New Rifle, Colorado, Processing Sites September 2014 LMS/RFO-RFN/S11940 This page intentionally left blank LMS/RFO-RFN/S11940 2014 Verification Monitoring Report for the Old and New Rifle, Colorado, Processing Sites September 2014 This page intentionally left blank U.S. Department of Energy 2014 Verification Monitoring Report for the Old and New Rifle, Colorado, Processing Sites September 2014 Doc. No. S11940 Page i Contents Abbreviations

  1. Colorado Springs, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Registered Energy Companies in Colorado Springs, Colorado American Agri diesel LLC American Solar Technology Diamond Wire Technology LLC Larankelo Mobile Energy...

  2. Lower Colorado River Authority | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Lower Colorado River Authority's communications requirements Lower Colorado River Authority (134.07

  3. Rio Bonito Energia Ltda | Open Energy Information

    Open Energy Info (EERE)

    Bonito Energia Ltda Jump to: navigation, search Name: Rio Bonito Energia Ltda. Place: Santa Catarina, Brazil Sector: Hydro Product: Brazilian project developer small hydro company...

  4. OpenEI Community - Colorado

    Open Energy Info (EERE)

    Colorado Meeting http:en.openei.orgcommunityblogcolorado-meeting

    Yesterday, we held a meeting with Colorado state agencies and geothemral developers to review the...

  5. Ch. I, Report on Waunita Hot Springs Project, Gunnison County...

    Open Energy Info (EERE)

    Report: Ch. I, Report on Waunita Hot Springs Project, Gunnison County, Colorado Author K. W. Nickerson and Associates Editor T. G. Zacharakis Published Colorado Geological...

  6. Interpretation of Water Sample Analysis, Waunita Hot Spring Project...

    Open Energy Info (EERE)

    of Water Sample Analysis, Waunita Hot Spring Project, Gunnison County, Colorado Author R. H. Carpenter Organization Colorado Geological Survey in Cooperation with the U.S....

  7. Environmental Assessment and Finding of No Significant Impact: Curecanti-Lost Canyon 230-kV Transmission Line Reroute Project, Montrose County, Colorado

    SciTech Connect (OSTI)

    N /A

    2000-03-20

    The Department of Energy (DOE), Western Area Power Administration (Western) is proposing to reroute a section of the Curecanti-Lost Canyon 230-kilovolt (kV) transmission line, in Montrose County, Colorado. A portion of the transmission line, situated 11 miles southeast of Montrose, Colorado, crosses Waterdog Peak, an area of significant geologic surface activity, which is causing the transmission line's lattice steel towers to shift. This increases stress to structure hardware and conductors, and poses a threat to the integrity of the transmission system. Western proposes to relocate the lattice steel towers and line to a more geologically stable area. The existing section of transmission line and the proposed relocation route cross Bureau of Land Management and private land holdings.

  8. Chaffee County, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Colorado BBI International Sun Dog Energy Places in Chaffee County, Colorado Buena Vista, Colorado Poncha Springs, Colorado Salida, Colorado Retrieved from "http:...

  9. Elbert County, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Climate Zone Number 5 Climate Zone Subtype B. Places in Elbert County, Colorado Elizabeth, Colorado Kiowa, Colorado Ponderosa Park, Colorado Simla, Colorado Retrieved from...

  10. Eagle County, Colorado Data Dashboard

    Broader source: Energy.gov [DOE]

    The data dashboard for Eagle County, Colorado, a partner in the Better Buildings Neighborhood Program.

  11. EIS-0395: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Decision EIS-0395: Record of Decision San Luis Rio Colorado Project PDF icon Record of Decision for the Western Area Power Administration San Luis Rio Colorado Project, DOE...

  12. Craig-Bonanza 345-kV Transmission Line Project: Environmental assessment

    SciTech Connect (OSTI)

    Not Available

    1988-01-01

    The Department of Energy (DOE), and the Western Area Power Administration (Western) proposes to construct and maintain a 345- kilovolt (kV) transmission line between Craig, Colorado, and Bonanza in eastern Utah. The project began in 1986 and construction is scheduled to be completed in 1989. The project, known as the Craig-Bonanza 345-kV Transmission Line Project (Project), will be located in Moffat and Rio Blanco counties in Colorado and Uintah County in Utah. Western has the lead role for project development and management, including environmental studies and construction. Cooperating federal agencies include the Bureau of Land Management (BLM), Rural Electrification Administration, US Fish and Wildlife Service, and Bureau of Indian Affairs. This environmental assessment was prepared in compliance with the National Environmental Policy Act (NEPA) and the regulations of the Council on Environmental Quality (CEQ), the DOE and the BLM. 360 refs., 33 figs., 21 tabs.

  13. Fort Collins, Colorado on Track to Net Zero

    Broader source: Energy.gov [DOE]

    The City of Fort Collins, Colorado, is embarking on an exciting new project that aims to reduce peak demand and help the city reduce its energy footprint to zero. Yes, zero. Find out how.

  14. Colorado Recovery Act State Memo | Department of Energy

    Office of Environmental Management (EM)

    The Recovery Act investments in Colorado are supporting a broad range of clean energy projects, from energy efficiency and the smart grid to solar power and biofuels. Through these ...

  15. Denver, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Organizations in Denver, Colorado Northern Colorado Clean Energy Cluster Wirth Chair in Sustainable Development, University of Colorado Denver Registered Energy Companies in...

  16. Colorado Renewable Energy Society | Open Energy Information

    Open Energy Info (EERE)

    Colorado Renewable Energy Society Name: Colorado Renewable Energy Society Address: PO Box 933 Place: Golden, Colorado Zip: 80402 Region: Rockies Area Website: www.cres-energy.org...

  17. Loveland, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    County, Colorado. It falls under Colorado's 4th congressional district.12 Registered Energy Companies in Loveland, Colorado Abound Solar Bekk Tech BekkTech LLC Hydraulic...

  18. Aspen, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Fork Valley - Energy Efficient Appliance Program (Colorado) Roaring Fork Valley - Energy Smart Colorado Renewable Energy Rebate Program (Colorado) References US Census Bureau...

  19. Alliance for Sustainable Colorado | Open Energy Information

    Open Energy Info (EERE)

    for Sustainable Colorado Jump to: navigation, search Logo: Alliance for Sustainable Colorado Name: Alliance for Sustainable Colorado Address: 1536 Wynkoop Street Place: Denver,...

  20. Denver, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Registered Policy Organizations in Denver, Colorado Northern Colorado Clean Energy Cluster Wirth Chair in Sustainable Development, University of Colorado Denver Registered...

  1. Colorado Electrical Transmission Grid

    SciTech Connect (OSTI)

    Zehner, Richard E.

    2012-02-01

    Citation Information: Originator: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Originator: Xcel Energy Publication Date: 2012 Title: Colorado XcelEnergy NonXcel Transmission Network Edition: First Publication Information: Publication Place: Earth Science & Observation Center, Cooperative Institute for Research in Environmental Science (CIRES), University of Colorado, Boulder Publisher: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Description: This layer contains transmission network of Colorado Spatial Domain: Extent: Top: 4540689.017558 m Left: 160606.141934 m Right: 758715.946645 m Bottom: 4098910.893397m Contact Information: Contact Organization: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Contact Person: Khalid Hussein Address: CIRES, Ekeley Building Earth Science & Observation Center (ESOC) 216 UCB City: Boulder State: CO Postal Code: 80309-0216 Country: USA Contact Telephone: 303-492-6782 Spatial Reference Information: Coordinate System: Universal Transverse Mercator (UTM) WGS’1984 Zone 13N False Easting: 500000.00000000 False Northing: 0.00000000 Central Meridian: -105.00000000 Scale Factor: 0.99960000 Latitude of Origin: 0.00000000 Linear Unit: Meter Datum: World Geodetic System ’1984 (WGS ’1984) Prime Meridian: Greenwich Angular Unit: Degree Digital Form: Format Name: Shapefile

  2. Colorado Regional Faults

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Hussein, Khalid

    2012-02-01

    Citation Information: Originator: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Originator: Colorado Geological Survey (CGS) Publication Date: 2012 Title: Regional Faults Edition: First Publication Information: Publication Place: Earth Science & Observation Center, Cooperative Institute for Research in Environmental Science, University of Colorado, Boulder Publisher: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Description: This layer contains the regional faults of Colorado Spatial Domain: Extent: Top: 4543192.100000 m Left: 144385.020000 m Right: 754585.020000 m Bottom: 4094592.100000 m Contact Information: Contact Organization: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Contact Person: Khalid Hussein Address: CIRES, Ekeley Building Earth Science & Observation Center (ESOC) 216 UCB City: Boulder State: CO Postal Code: 80309-0216 Country: USA Contact Telephone: 303-492-6782 Spatial Reference Information: Coordinate System: Universal Transverse Mercator (UTM) WGS’1984 Zone 13N False Easting: 500000.00000000 False Northing: 0.00000000 Central Meridian: -105.00000000 Scale Factor: 0.99960000 Latitude of Origin: 0.00000000 Linear Unit: Meter Datum: World Geodetic System 1984 (WGS ’984) Prime Meridian: Greenwich Angular Unit: Degree Digital Form: Format Name: Shape file

  3. Ft. Carson Army Base, Colorado Springs, Colorado | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ft. Carson Army Base, Colorado Springs, Colorado Ft. Carson Army Base, Colorado Springs, Colorado Photo of High-Bay Aviation Maintenance Facility at Butts Army Airfield Fort Carson U.S. Army Base is located south of Colorado Springs, Colorado. It was the first Federal facility to install a "solar wall"-a solar ventilation air preheating system. The solar wall heats Ft. Carson's new high-bay aviation maintenance facility at Butts Army Airfield by pre-warming air as much as 54°F and

  4. Lower Colorado River Authority | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    from Lower Colorado River Authority on Smart Grid communications requirements Lower Colorado River Authority (349.31

  5. Colorado: Colorado's Clean Energy Resources and Economy (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2013-03-01

    This document highlights the Office of Energy Efficiency and Renewable Energy's investments and impacts in the state of Colorado.

  6. Colorado Potential Geothermal Pathways

    SciTech Connect (OSTI)

    Zehner, Richard E.

    2012-02-01

    Citation Information: Originator: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Publication Date: 2012 Title: Colorado PRS Cool Fairways Edition: First Publication Information: Publication Place: Earth Science & Observation Center, Cooperative Institute for Research in Environmental Science (CIRES), University of Colorado, Boulder Publisher: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Description: This layer contains the weakened basement rocks. Isostatic gravity was utilized to identify structural basin areas, characterized by gravity low values reflecting weakened basement rocks. Together interpreted regional fault zones and basin outlines define geothermal "exploration fairways", where the potential exists for deep, superheated fluid flow in the absence of Pliocene or younger volcanic units Spatial Domain: Extent: Top: 4544698.569273 m Left: 144918.141004 m Right: 763728.391299 m Bottom: 4094070.397932 m Contact Information: Contact Organization: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Contact Person: Khalid Hussein Address: CIRES, Ekeley Building Earth Science & Observation Center (ESOC) 216 UCB City: Boulder State: CO Postal Code: 80309-0216 Country: USA Contact Telephone: 303-492-6782 Spatial Reference Information: Coordinate System: Universal Transverse Mercator (UTM) WGS’1984 Zone 13N False Easting: 500000.00000000 False Northing: 0.00000000 Central Meridian: -105.00000000 Scale Factor: 0.99960000 Latitude of Origin: 0.00000000 Linear Unit: Meter Datum: World Geodetic System ’1984 (WGS ’1984) Prime Meridian: Greenwich Angular Unit: Degree Digital Form: Format Name: Shape file

  7. Final Project Report

    SciTech Connect (OSTI)

    Wang, Qiang; Dandy, David S.

    2015-05-15

    This is the final technical report of the DOE project DE-FG02-07ER46448 awarded to Colorado State University.

  8. Costilla County, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Subtype B. Places in Costilla County, Colorado Blanca, Colorado Fort Garland, Colorado San Luis, Colorado Retrieved from "http:en.openei.orgwindex.php?titleCostillaCounty,...

  9. Colorado/Wind Resources/Full Version | Open Energy Information

    Open Energy Info (EERE)

    Distributed Wind Energy Association Colorado Wind Resources Colorado Energy Office AWEA State Wind Energy Statistics: Colorado Colorado Center for Renewable Energy...

  10. Sedgwick County, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    5 Climate Zone Subtype B. Places in Sedgwick County, Colorado Julesburg, Colorado Ovid, Colorado Sedgwick, Colorado Retrieved from "http:en.openei.orgw...

  11. Ouray County, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Subtype B. Registered Energy Companies in Ouray County, Colorado Alternative Power Enterprises Places in Ouray County, Colorado Loghill Village, Colorado Ouray, Colorado Ridgway,...

  12. Colorado's 3rd congressional district: Energy Resources | Open...

    Open Energy Info (EERE)

    Appliance Program (Colorado) Roaring Fork Valley - Energy Smart Colorado Renewable Energy Rebate Program (Colorado) Utility Companies in Colorado's 3rd congressional district Black...

  13. Raptor Use of the Rio Grande Gorge

    SciTech Connect (OSTI)

    Ponton, David A.

    2015-03-20

    The Rio Grande Gorge is a 115 km long river canyon located in Southern Colorado (15 km) and Northern New Mexico (100 km). The majority of the canyon is under the administration of the Bureau of Land Management {BLM), and 77 km of the canyon south of the Colorado/New Mexico border are designated Wild River under the National Wild and Scenic Rivers Act of 1968. Visits I have made to the Rio Grande Gorge over the past 15 .years disclosed some raptor utilization. As the Snake River Birds of Prey Natural Area gained publicity, its similarity to the Rio Grande Gorge became obvious, and I was intrigued by the possibility of a high raptor nesting density in the Gorge. A survey in 1979 of 20 km of the northern end of the canyon revealed a moderately high density of red-tailed hawks and prairie falcons. With the encouragement of that partial survey, and a need to assess the impact of river-running on nesting birds of prey, I made a more comprehensive survey in 1980. The results of my surveys, along with those of a 1978 helicopter survey by the BLM, are presented in this report, as well as general characterization of the area, winter use by raptors, and an assessment of factors influencing the raptor population.

  14. Commercial-Scale Renewable Energy Project Development and Finance Workshop:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Colorado | Department of Energy and Finance Workshop: Colorado Commercial-Scale Renewable Energy Project Development and Finance Workshop: Colorado July 9, 2013 - 5:27pm Addthis July 9-11, 2013 Golden, Colorado National Renewable Energy Laboratory The Office of Indian Energy hosted a Commercial-Scale Renewable Energy Project Development and Finance Workshop July 9-11 at the National Renewable Energy Laboratory in Golden, Colorado. Twenty participants from 13 Tribes took part in this training

  15. Geothermal Prospects in Colorado | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Prospects in Colorado Geothermal Prospects in Colorado Geothermal Prospects in Colorado presentation at the April 2013 peer review meeting held in Denver, Colorado. garrett_peer2013.pdf (2 MB) More Documents & Publications Geothermal Prospects in Colorado Stanford Geothermal Workshop 2012 Annual Meeting Fiscal Year 2013 Budget Request Briefing

  16. Usina Rio Vermelho de Energia Ltda | Open Energy Information

    Open Energy Info (EERE)

    de Energia Ltda Jump to: navigation, search Name: Usina Rio Vermelho de Energia Ltda. Place: So Bento do Sul, Santa Catarina, Brazil Sector: Hydro Product: Small Hydro project...

  17. Colorado Geothermal Commercialization Program

    SciTech Connect (OSTI)

    Healy, F.C.

    1980-04-01

    Chaffee County, located in central Colorado, has immense potential for geothermal development. This report has been prepared to assist residents and developers in and outside the area to develop the hydrothermal resources of the county. Data has been collected and interpreted from numerous sources in order to introduce a general description of the area, estimate energy requirements, describe the resources and postulate a development plan. Electric power generation and direct heat application potential for the region are described.

  18. Presidential Climate Action Project | Open Energy Information

    Open Energy Info (EERE)

    Page Edit with form History Presidential Climate Action Project Jump to: navigation, search Name: Presidential Climate Action Project Place: Denver, Colorado Zip: 80217-3364...

  19. Colorado Water Courts | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Colorado Water Courts Abstract This is the website for Colorado Water Courts. Author Colorado...

  20. AMF Deployment, Steamboat Springs, Colorado

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Colorado Steamboat Deployment AMF Home Steamboat Springs Home Storm Peak Lab Data Plots and Baseline Instruments Data Sets Experiment Planning STORMVEX Proposal Abstract and...

  1. Rulison, Colorado, Site Fact Sheet

    Office of Legacy Management (LM)

    4 Fact Sheet This fact sheet provides information about the Rulison, Colorado, Site. This site is managed by the U.S. Department of Energy Office of Legacy Management. Rulison, Colorado, Site Location of the Rulison, Colorado, Site Site Description and History The Rulison site is located 8,154 feet above sea level on the north fank of Battlement Mesa in western Colorado, approximately 12 miles southwest of the town of Rife and 8 miles southeast of the town of Parachute. On September 10, 1969,

  2. Colombia-World Bank Climate Projects | Open Energy Information

    Open Energy Info (EERE)

    Offset Project "The Colombia Rio Frio Carbon Offset Project aims to reduce greenhouse gas emissions fro the wastewater treatment sector in Colombia by modernizing the Rio Frio...

  3. Upper Rio Grande Simulation Model (URGSIM)

    Energy Science and Technology Software Center (OSTI)

    2010-08-05

    URGSIM estimates the location of surface water and groundwater resources in the upper Rio Grande Basin between the Colorado-New Mexico state line, and Caballo Reservoir from 1975 - 2045. It is a mass balance hydrology model of the Upper Rio Grande surface water, groundwater, and water demand systems which runs at a monthly timestep from 1975-1999 in calibration mode, 2000 – 2004 in validation mode, and 2005 – 2045 in scenario analysis mode.

  4. Golden, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    in Golden, Colorado Ampulse Ampulse Corporation Blue Sun Biodiesel LLC Colorado Fuel Cell Center CFCC Energistic Systems Energy Solutions Partners, LLC Industrial Solar...

  5. Colorado - Access Permit Application File Review Checklist |...

    Open Energy Info (EERE)

    Jump to: navigation, search OpenEI Reference LibraryAdd to library General: Colorado - Access Permit Application File Review Checklist Author Colorado Department of Transportation...

  6. Colorado/Incentives | Open Energy Information

    Open Energy Info (EERE)

    Yes Building Energy Code (Colorado) Building Energy Code Yes City and County of Denver - Solar Panel Permitting (Colorado) SolarWind Permitting Standards Yes City of Aspen -...

  7. Colorado: Isothermal Battery Calorimeter Quantifies Heat Flow...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Colorado: Isothermal Battery Calorimeter Quantifies Heat Flow, Helps Make Safer, Longer-lasting Batteries Colorado: Isothermal Battery Calorimeter Quantifies Heat Flow, Helps Make ...

  8. Colorado Renewable Resource Cooperative | Open Energy Information

    Open Energy Info (EERE)

    Product: Colorado-based cooperative and forestry producer, that targets the use of woody biomass to generate heat or electricity. References: Colorado Renewable Resource...

  9. Northern Colorado Clean Cities | Open Energy Information

    Open Energy Info (EERE)

    Cities Jump to: navigation, search Name: Northern Colorado Clean Cities Address: PO Box 759 Place: Johnstown, Colorado Zip: 80534 Region: Rockies Area Number of Employees:...

  10. Colorado Meeting | OpenEI Community

    Open Energy Info (EERE)

    Colorado Meeting Home > Blogs > Kyoung's blog Kyoung's picture Submitted by Kyoung(150) Contributor 7 March, 2013 - 10:24 1031 regulations Colorado Yesterday, we held a meeting...

  11. Colorado Water Quality Certification General Information | Open...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Colorado Water Quality Certification General InformationLegal Abstract The Colorado Department of...

  12. Colorado Renewable Energy Collaboratory | Open Energy Information

    Open Energy Info (EERE)

    Collaboratory Jump to: navigation, search Logo: Colorado Renewable Energy Collaboratory Name: Colorado Renewable Energy Collaboratory Address: 410 17th Street, Suite 1400 Place:...

  13. Golden, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Society Registered Energy Companies in Golden, Colorado Ampulse Ampulse Corporation Blue Sun Biodiesel LLC Colorado Fuel Cell Center CFCC Energistic Systems Energy Solutions...

  14. Colorado Construction Dewatering General Permit | Open Energy...

    Open Energy Info (EERE)

    Colorado Construction Dewatering General Permit Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Colorado Construction Dewatering...

  15. Colorado Energy Office | Open Energy Information

    Open Energy Info (EERE)

    Office Jump to: navigation, search Name: Colorado Energy Office Address: 1580 Logan Street, Suite 100 Place: Denver, CO Zip: 80203 Website: www.colorado.govenergy Coordinates:...

  16. Carbondale, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    3rd congressional district.12 Registered Policy Organizations in Carbondale, Colorado Sustainability Center of the Rockies Registered Energy Companies in Carbondale, Colorado...

  17. Niwot, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    place in Boulder County, Colorado.1 Registered Energy Companies in Niwot, Colorado Quantum Energy LLC References US Census Bureau 2005 Place to 2006 CBSA Retrieved from...

  18. Colorado Natural Gas- Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    Colorado Natural Gas offers the Excess is Out Program for residential and commercial customers in Colorado. Incentives are available for purchasing and installing energy efficient furnaces, boilers...

  19. Colorado General Permit for Construction Dewatering Activities...

    Open Energy Info (EERE)

    Frequently Asked Questions. Colorado Department of Public Health and Environment. 4p. GuideHandbook sent to Retrieved from "http:en.openei.orgwindex.php?titleColorado...

  20. Colorado Division of Wildlife | Open Energy Information

    Open Energy Info (EERE)

    Wildlife Jump to: navigation, search Name: Colorado Parks and Wildlife Address: 1313 Sherman Street, Suite 618 Place: Denver, Colorado Zip: 80203 Phone Number: (303) 866-3437...

  1. High Performance Photovoltaic Project: Identifying Critical Pathways, Phase 1 Review Meeting, 15-16 July 2002, Denver, Colorado (CD-ROM)

    SciTech Connect (OSTI)

    Symko-Davies, M.; Robinson, P.

    2002-12-01

    The High-Performance PV Project, Phase 1 objectives are: Accelerate the development of PV in the 21st century to meet economic and environmental needs, and double sunlight-to-electricity conversion efficiency of cost-competitive PV technologies. Cost-competitive technologies: high-flux concentrators-high-efficiency multijunction cells, single-axis concentrators using thin-film cells; and low-cost multijunction thin films for large-area, monolithically interconnected flat-plate modules. Subcontracts are under way toward project targets; polycrystalline in-house efforts focus on the top cell of a tandem structure; and the III-V multijunction in-house effort focuses on the GaInAsN junction.

  2. Microsoft Word - DOE-ID-11-007 Colorado Mines EC.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 SECTION A. Project Title: Imaging Upgrades for the Colorado School of Mines Nuclear Science and Engineering Program - Colorado School of Mines SECTION B. Project Description This project has three objectives: 1. Upgrade the Transmission Electron Microscope in the Active Materials Characterization Laboratory (ActMCL) with a digital imaging system 2. Upgrade the ActMCL and Nuclear Fuel Development Lab (NFDL) with modern radiation detection and measurement equipment, for both research and

  3. Microsoft Word - DOE-ID-12-009 Colorado School of Mines.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    09 SECTION A. Project Title: Upgrades to the Colorado School of Mines Neutron Imaging Beam-Line SECTION B. Project Description The Colorado School Mines project has three objectives: - Upgrade CSM's Neutron Imaging Beam-Line, including the addition of several modular filters that will allow fine-tuning of the resulting neutron beam - Provide additional neutron detection and measurement equipment to allow direct measurement of the beam's neutron flux and energy spectrum by purchasing a gamma+

  4. Microsoft Word - DOE-ID-12-022 Colorado State.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 SECTION A. Project Title: Revitalizing Health Physics Education for Nuclear Energy Careers - Colorado State University SECTION B. Project Description The objectives of this Colorado State University project are to update instrumentation to reflect current instruments utilized at nuclear power plants and national laboratories, utilize measurement equipment to perform research, and achieve ISO 17025 accreditation. This will be accomplished by purchasing a CZT-based portable detector, alpha

  5. Rio Arriba Leadership Summit

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Rio Arriba Leadership Summit addresses challenges, opportunities July 6, 2016 Two-dozen community leaders gathered on the seventh floor of the Santa Claran Hotel on June 27 for the second Rio Arriba Leadership Summit, hosted by the Rio Arriba County Commission. After a welcome and call to order by Commission Chair Alex Naranjo, the afternoon unfolded into a productive conversation about the opportunities and challenges facing businesses and organizations in and around Rio Arriba County-the 5,896

  6. Colorado STEP Training

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Colorado Natural Gas Gross Withdrawals (Million Cubic Feet) Colorado Natural Gas Gross Withdrawals (Million Cubic Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1991 21,103 24,172 24,435 25,590 23,263 23,548 23,557 24,550 23,440 24,584 25,178 31,698 1992 28,269 26,307 25,490 26,125 27,205 27,139 26,396 27,842 27,128 28,391 29,527 34,175 1993 32,694 29,383 33,718 34,380 36,385 33,931 32,995 34,802 33,910 35,488 36,448 39,870 1994 39,207 35,941 38,103 38,734 41,588 36,686 38,457 39,010

  7. Community- and Facility-Scale Tribal Renewable Energy Project Development

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Finance Workshop: Colorado | Department of Energy and Facility-Scale Tribal Renewable Energy Project Development and Finance Workshop: Colorado Community- and Facility-Scale Tribal Renewable Energy Project Development and Finance Workshop: Colorado September 18, 2013 - 2:20pm Addthis September 18-20, 2013 Golden, Colorado National Renewable Energy Laboratory The Office of Indian Energy held a Community- and Facility-Scale Tribal Renewable Energy Project Development and Finance Workshop

  8. Colorado Community Readiness Efforts for PEVs Support State Policy Development

    Office of Energy Efficiency and Renewable Energy (EERE)

    Project FEVER (Fostering Electric Vehicle Expansion in the Rockies), funded by EEREs Clean Cities plug-in electric vehicle community readiness award, has supported the development of Colorado state policies to accelerate the adoption of plug-in electric vehicles (PEVs).

  9. Microsoft Word - DOE-ID-12-013 Colorado School of Mines.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    School of Mines SECTION B. Project Description The Colorado School of Mines will purchase a Robo-Met.3D automated polishing, serial-sectioning, and image acquisition station. ...

  10. Town of Estes Park, Colorado (Utility Company) | Open Energy...

    Open Energy Info (EERE)

    Estes Park, Colorado (Utility Company) Jump to: navigation, search Name: Town of Estes Park Place: Colorado Phone Number: 970-586-5331 Website: www.colorado.govpacifictowno...

  11. Adams County, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Colorado Access Venture Partners Energy Generation Facilities in Adams County, Colorado Metro Wastewater Reclamation District Biomass Facility Places in Adams County, Colorado...

  12. Colorado Governor s Energy Office | Open Energy Information

    Open Energy Info (EERE)

    Governor s Energy Office Jump to: navigation, search Name: Colorado Governor's Energy Office Place: Denver, Colorado Zip: 80203 Product: Governor's Energy Office of Colorado...

  13. Colorado Fuel Cell Center CFCC | Open Energy Information

    Open Energy Info (EERE)

    Center CFCC Jump to: navigation, search Name: Colorado Fuel Cell Center (CFCC) Place: Golden, Colorado Zip: 80401 Product: A center planned to meet State of Colorado targets for...

  14. Fort Collins, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Program (Colorado) Fort Collins Utilities - Residential and Small Commercial Appliance Rebate Program (Colorado) Utility Companies in Fort Collins, Colorado City of Fort...

  15. Colorado's 4th congressional district: Energy Resources | Open...

    Open Energy Info (EERE)

    Program (Colorado) Fort Collins Utilities - Residential and Small Commercial Appliance Rebate Program (Colorado) Utility Companies in Colorado's 4th congressional district City...

  16. Colorado Regions | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    state, county, city, or district. For more information, please visit the Middle School Coach page. Colorado Region Middle School Regional Colorado Colorado Regional Middle School...

  17. Colorado Region | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    designated for your school's state, county, city, or district. For more information, please visit the High School Coach page. Colorado Region High School Regional Colorado Colorado...

  18. Denver County, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Policy Organizations in Denver County, Colorado Northern Colorado Clean Energy Cluster Wirth Chair in Sustainable Development, University of Colorado Denver Registered...

  19. Evolution of a Groundwater Treatment System-Rocky Flats, Colorado, Site |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Evolution of a Groundwater Treatment System-Rocky Flats, Colorado, Site Evolution of a Groundwater Treatment System-Rocky Flats, Colorado, Site January 13, 2015 - 5:18pm Addthis What does this project do? Goal 1. Protect human health and the environment. A project to reconfigure the East Trenches Plume Treatment System (ETPTS) at the Rocky Flats site, to improve treatment effectiveness and meet the strict water quality standards in the area, is scheduled to be completed

  20. Microsoft Word - DOE-ID-13-074 Colorado EC B3-6.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 SECTION A. Project Title: Microwave Readout Techniques for Very Large Arrays of Nuclear Sensors - University of Colorado SECTION B. Project Description The University of Colorado, in collaboration with the National Institute for Standards & Technology (NIST), proposes to develop an inexpensive yet powerful readout technique based on microwave transmission and reflection that will enable very large arrays of diverse sensor types for nuclear materials quantification and tracking.

  1. EERE Success Story-Two Colorado-Based Electric Cooperatives Selected as

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2014 Wind Cooperatives of the Year. | Department of Energy Two Colorado-Based Electric Cooperatives Selected as 2014 Wind Cooperatives of the Year. EERE Success Story-Two Colorado-Based Electric Cooperatives Selected as 2014 Wind Cooperatives of the Year. March 24, 2015 - 10:55am Addthis Huerfano River Wind project; Photo courtesy of San Isabel Electric Association , Inc. Huerfano River Wind project; Photo courtesy of San Isabel Electric Association , Inc. Tri-State Generation and

  2. Solar Home in Boulder, Colorado

    Office of Energy Efficiency and Renewable Energy (EERE)

    This photograph features a 2.04-kilowatt grid-tied solar photovoltaic (PV) electric system on the Edwards home in Colorado that generates clean, carbon-free electricity. Generous utility and...

  3. Smart Grid Pilot Program- Colorado

    Broader source: Energy.gov [DOE]

    This b-roll shows a pilot program to modernize the electrical distribution system in Fort Collins, Colorado, where a smart grid connects industrial and commercial buildings employing renewable...

  4. Public Involvment Plan - Rifle, Colorado

    Office of Legacy Management (LM)

    ... Atomic Energy Commission (AEC) records from 1947 to 1958 show that 761,000 tons of ore ... that included the upgrading facilities at Slick Rock, Colorado, and Green River, Utah. ...

  5. Code of Colorado Regulations 5 CCR 1002-61, Colorado Discharge...

    Open Energy Info (EERE)

    Code of Colorado Regulations 5 CCR 1002-61, Colorado Discharge Permit System Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document-...

  6. Community- and Facility-Scale Tribal Renewable Energy Project...

    Office of Environmental Management (EM)

    and Facility-Scale Tribal Renewable Energy Project Development and Finance Workshop: Colorado Community- and Facility-Scale Tribal Renewable Energy Project Development and Finance ...

  7. Commercial-Scale Project Development and Finance Workshop Agenda...

    Energy Savers [EERE]

    Commercial-Scale Project Development and Finance Workshop Agenda and Presentations: Colorado Commercial-Scale Project Development and Finance Workshop Agenda and Presentations: ...

  8. Multifamily Projects | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Multifamily Projects Multifamily Projects Presents Energy Smart Colorado's approach to driving demand for multifamily residential energy efficiency upgrades. Energy Smart Colorado presentation (991.06 KB) More Documents & Publications Information Technology Tools for Multifamily Building Programs Track C - Market-Driven Research Solutions Building America Whole-House Solutions for New Homes: Pulte Homes and Communities of Del Webb, Las Vegas, Nevada

  9. Radionuclide Migration at the Rio Blanco Site, A Nuclear-stimulated Low-permeability Natural Gas Reservoir

    SciTech Connect (OSTI)

    Clay A. Cooper; Ming Ye; Jenny Chapman; Craig Shirley

    2005-10-01

    The U.S. Department of Energy and its predecessor agencies conducted a program in the 1960s and 1970s that evaluated technology for the nuclear stimulation of low-permeability gas reservoirs. The third and final project in the program, Project Rio Blanco, was conducted in Rio Blanco County, in northwestern Colorado. In this experiment, three 33-kiloton nuclear explosives were simultaneously detonated in a single emplacement well in the Mesaverde Group and Fort Union Formation, at depths of 1,780, 1,899, and 2,039 m below land surface on May 17, 1973. The objective of this work is to estimate lateral distances that tritium released from the detonations may have traveled in the subsurface and evaluate the possible effect of postulated natural-gas development on radionuclide migration. Other radionuclides were considered in the analysis, but the majority occur in relatively immobile forms (such as nuclear melt glass). Of the radionuclides present in the gas phase, tritium dominates in terms of quantity of radioactivity in the long term and contribution to possible whole body exposure. One simulation is performed for {sup 85}Kr, the second most abundant gaseous radionuclide produced after tritium.

  10. RAPID/Overview/Geothermal/Exploration/Colorado | Open Energy...

    Open Energy Info (EERE)

    Colorado < RAPID | Overview | Geothermal | Exploration(Redirected from RAPIDAtlasGeothermalExplorationColorado) Redirect page Jump to: navigation, search REDIRECT...

  11. Colorado Solar Inc | Open Energy Information

    Open Energy Info (EERE)

    ","group":"","inlineLabel":"","visitedicon":"" Hide Map References: Colorado Solar Inc Web Site1 This article is a stub. You can help OpenEI by expanding it. Colorado Solar...

  12. Pueblo, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Hide Map This article is a stub. You can help OpenEI by expanding it. Pueblo is a city in Pueblo County, Colorado. It falls under Colorado's 3rd congressional...

  13. Colorado State University | Open Energy Information

    Open Energy Info (EERE)

    University Jump to: navigation, search Name: Colorado State University Place: Colorado Phone Number: (970) 491-1101 or 907-491-6444 Website: www.colostate.edu Outage Hotline:...

  14. Colorado Nonpoint Source Website | Open Energy Information

    Open Energy Info (EERE)

    Source Website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Colorado Nonpoint Source Website Abstract This is the website of the Colorado...

  15. Aurora, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Hide Map This article is a stub. You can help OpenEI by expanding it. Aurora is a city in Adams County and Arapahoe County and Douglas County, Colorado. It falls under Colorado's...

  16. Geothermal resources of Colorado | Open Energy Information

    Open Energy Info (EERE)

    OpenEI Reference LibraryAdd to library Report: Geothermal resources of Colorado Author R.H. Pearl Published Colorado Geological Survey Special Publication, 1972 DOI Not Provided...

  17. Westminster, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    This article is a stub. You can help OpenEI by expanding it. Westminster is a city in Adams County and Jefferson County, Colorado. It falls under Colorado's 2nd congressional...

  18. Thornton, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Map This article is a stub. You can help OpenEI by expanding it. Thornton is a city in Adams County and Weld County, Colorado. It falls under Colorado's 2nd congressional district...

  19. Arvada, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Map This article is a stub. You can help OpenEI by expanding it. Arvada is a city in Adams County and Jefferson County, Colorado. It falls under Colorado's 7th congressional...

  20. Aurora, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Map This article is a stub. You can help OpenEI by expanding it. Aurora is a city in Adams County and Arapahoe County and Douglas County, Colorado. It falls under Colorado's 7th...

  1. Brighton, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Map This article is a stub. You can help OpenEI by expanding it. Brighton is a city in Adams County and Weld County, Colorado. It falls under Colorado's 7th congressional district...

  2. Colorado DWR GWS-31 | Open Energy Information

    Open Energy Info (EERE)

    1 Jump to: navigation, search OpenEI Reference LibraryAdd to library Reference: Colorado DWR GWS-31 Published Colorado Division of Water Resources, Date Not Provided DOI Not...

  3. Grand Junction, Colorado, Site Fact Sheet

    Office of Legacy Management (LM)

    D D&D Page 1 of 3 Fact Sheet Grand Junction, Colorado, Site This fact sheet provides information about the Grand Junction, Colorado, Site. This site is managed by the U.S. ...

  4. Avon, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Hide Map This article is a stub. You can help OpenEI by expanding it. Avon is a town in Eagle County, Colorado. It falls under Colorado's 2nd congressional...

  5. Denver, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Colorado Renewable Energy Collaboratory Denver University - International Institute for Environment and Enterprise Institute for Environmental Solutions Secure Smart Grid...

  6. Programmatic Agreement for Colorado | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Programmatic Agreement for Colorado Programmatic Agreement for Colorado U.S. Department of Energy (DOE), Energy Efficiency and Conservation Block Grant Program (EECBG), Weatherization Assistance Program (WAP), State Energy Plan (SEP), Colorado State Historic Preservation Office (SHPO), Colorado Governors Energy Office (GEO), historic preservation, Section 106 of the National Historic Preservation Act, National Register of Historic Places, National Historic Preservation Act (NHPA), Programmatic

  7. Colorado State University Technology Marketing Summaries - Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Innovation Portal Colorado State University Technology Marketing Summaries Here you'll find marketing summaries for technologies available for licensing from the Colorado State University (CSU). The summaries provide descriptions of the technologies including their benefits, applications and industries, and development stage. Colorado State University 16 Technology Marketing Summaries Category Title and Abstract Laboratories Date Advanced Materials Biomass and Biofuels Industrial

  8. EERE Success Story-Colorado Community Readiness Efforts for PEVs Support

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    State Policy Development | Department of Energy Community Readiness Efforts for PEVs Support State Policy Development EERE Success Story-Colorado Community Readiness Efforts for PEVs Support State Policy Development August 7, 2014 - 10:55am Addthis Project FEVER (Fostering Electric Vehicle Expansion in the Rockies), funded by EERE's Clean Cities plug-in electric vehicle community readiness award, has supported the development of Colorado state policies to accelerate the adoption of plug-in

  9. EIS-0116-S1: Final Supplemental Environmental Impact Statement for the Blue River-Gore Pass Portion of the Hayden-Blue River Transmission Line Project, Grand and Summit Counties, Colorado

    Broader source: Energy.gov [DOE]

    This supplemental environmental impact statement by the Western Area Power Administration assesses the environmental effects of constructing, operating, and maintaining about 30 miles of 230/345-kV transmission line between the existing Gore Pass Substation northwest of Kremmling, Colorado, and a proposed new substation (not part of this action) near the Ute Pass Road. Alternatives assessed included routing and design alternatives plus the alternatives addressed in the Hayden-Blue River Final EIS, issued by the Rural Electrification Administration in July 1982 and adopted by DOE in June 1985 (see DOE/EIS-0116).

  10. Microsoft Word - DOE-ID-15-034 Colorado SofM EC B3-6.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 SECTION A. Project Title: Kr/Xe Separation over Metal Organic Framework Membranes - Colorado School of Mines SECTION B. Project Description The Colorado School of Mines proposes to establish a solid fundamental science program leading to the rational design of a novel family of membranes, composed of metal organic frameworks which offer the possibility of demonstrating high separation performance for Kr/Xe gas mixtures. Specific objectives include 1) the development of continuous and

  11. Microsoft Word - DOE-ID-15-035 Colorado SofM EC B3-6.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 SECTION A. Project Title: Assessment of Aging Degradation Mechanisms of Alloy 709 for Sodium Fast Reactors - Colorado School of Mines SECTION B. Project Description The Colorado School of Mines proposes to develop sufficient understanding of the mechanisms responsible for behavior of NF 709 under accelerated testing conditions to confidently predict long-term creep and creep-fatigue behavior at the times (500,000 hours) and temperatures (550 o C) of interest for fast reactor structural

  12. Geology of the lower Yellow Creek Area, Northwestern Colorado

    SciTech Connect (OSTI)

    Hail, W.J.

    1990-01-01

    The lower Yellow Creek area is located in Rio Blanco and Moffat Counties of northwestern Colorado, about midway between the towns of Rangely and Meeker. The study area is in the northwestern part of the Piceance Creek basin, a very deep structural and sedimentary basin that formed during the Laramide orogeny. Potentially important resources in the area are oil shale and related minerals, oil and gas, coal, and uranium. Topics discussed in the report include: Stratigraphy (Subsurface rocks, Cretaceous rocks, Tertiary rocks, and Quaternary deposits); Structure (Midland anticline, graben at Pinyon Ridge, and Crooked Wash syncline, Folds and faults in the vicinity of the White River, Red Wash syncline and central graben zone, Yellow Creek anticlinal nose); Economic geology (Oil shale and associated minerals, Coal, Oil and gas, Uranium, Gravel).

  13. Colorado Scientists Win National Award

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Scientists Win National Award For more information contact: e:mail: Public Affairs Golden, Colo., July 14, 1999 — Two Colorado scientists will share a major national award for their part in developing a process that can help turn common waste from city landfills and the paper mill industry into environmentally friendly products, such as biodegradable pesticides and gasoline additives. Dr. Joseph Bozell and Dr. Luc Moens at the U.S. Department of Energy's (DOE) National Renewable Energy

  14. Categorical Exclusion Determinations: Colorado | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Colorado Categorical Exclusion Determinations: Colorado Location Categorical Exclusion Determinations issued for actions in Colorado. DOCUMENTS AVAILABLE FOR DOWNLOAD July 5, 2016 CX-100650 Categorical Exclusion Determination Device Architecture for Next-Generation CdTe PV Award Number: DE-EE0007543 CX(s) Applied: A9, B3.6 Solar Energy Technology Office Date: 6/21/2016 Location(s): CO Office(s): Golden Field Office June 13, 2016 CX-100643 Categorical Exclusion Determination NWTC Diesel Storage

  15. Garfield County, Colorado | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Garfield County, Colorado Garfield County, Colorado Garfield Clean Energy Location: Garfield County, Colorado Seed Funding: $545,000 - a portion of Boulder County's $25 million funding Target Building Types: Residential and commercial Website: www.garfieldcleanenergy.org Learn more: Explore the Energy Navigator Facebook: Garfield Clean Energy Read Garfield New Energy Communities Initiative: Results Based on DOLA Contract Exhibit A Read program newsletter Review case studies See program publicity

  16. Colorado Industrial Energy Challenge | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    State and Utility Engagement Activities » Colorado Industrial Energy Challenge Colorado Industrial Energy Challenge Colorado The U.S. Department of Energy's (DOE's) Advanced Manufacturing Office (AMO; formerly the Industrial Technologies Program) has developed multiple resources and a Best Practices suite of tools to help industrial manufacturers reduce their energy intensity. AMO adopted the Energy Policy Act of 2005 objective of reducing industrial energy intensity 2.5% annually over the next

  17. Colorado E85 Dispensing Waiver Letter

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Date: December 27, 2006 FROM: Colorado Division of Oil and Public Safety Colorado Division of Fire Safety Fire Marshals' Association of Colorado Governor's Office of Energy Management and Conservation TO: All Interested Parties RE: E-85 Dispensers On October 5, 2006, Underwriters Laboratories (UL) suspended authorization for manufacturers to use UL Markings (listing or recognition) on components for fuel dispensing devices that specifically reference compatibility with alcohol blended fuels that

  18. RAPID/Geothermal/Transmission Siting & Interconnection/Colorado...

    Open Energy Info (EERE)

    Colorado CRS 29-20-108, Location, Construction, or Improvement of Major Electrical or Natural Gas Facilities Colorado Department of Local Affairs Colorado - C.R.S. 40-1-103 -...

  19. Energy-water challenge emerges in Colorado River flows

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy-water challenge emerges in Colorado River flows Energy-water challenge emerges in Colorado River flows Climate-driven heat-stress and forest mortality on the Colorado River ...

  20. Evans, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Evans, Colorado: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 40.3763701, -104.6921874 Show Map Loading map... "minzoom":false,"mappingservi...

  1. Colorado Public Utilities Commission | Open Energy Information

    Open Energy Info (EERE)

    CBONDORA1251633139779 Retrieved from "http:en.openei.orgwindex.php?titleColoradoPublicUtilitiesCommission&oldid886925" Feedback Contact needs updating Image needs...

  2. Cleantech Solutions (Colorado) | Open Energy Information

    Open Energy Info (EERE)

    Place: Boulder, Colorado Zip: 80301 Region: Rockies Area Sector: Efficiency Product: Energy efficiency solutions and consumption monitoring systems for buildings Website:...

  3. ,"Colorado Natural Gas Gross Withdrawals and Production"

    U.S. Energy Information Administration (EIA) Indexed Site

    Name","Description"," Of Series","Frequency","Latest Data for" ,"Data 1","Colorado Natural Gas Gross Withdrawals and Production",10,"Annual",2014,"06301967" ,"Release...

  4. Colorado Dairy Industry Boosts Energy Efficiency | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Through the Colorado Dairy and Irrigation Efficiency Pilot, eight dairies received a free energy audit and energy-saving recommendations. If the farms followed the recommendations, ...

  5. REC Solar (Colorado) | Open Energy Information

    Open Energy Info (EERE)

    Court Place: Westminster, Colorado Zip: 80030 Region: Rockies Area Sector: Solar Product: Solar panel installer Website: recsolar.com Coordinates: 39.860526, -105.066446 Show...

  6. Protonex Technology Corporation (Colorado) | Open Energy Information

    Open Energy Info (EERE)

    510 Compton Street Place: Broomfield, Colorado Zip: 80020 Region: Rockies Area Sector: Hydrogen Product: Portable fuel cells Website: www.protonex.com Coordinates: 39.924172,...

  7. Colorado State University Hydrodynamics | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search Hydro | Hydrodynamic Testing Facilities Name Colorado State University Address Daryl B. Simons Building, Engineering Research Center, 1320 Campus...

  8. Pierce, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Pierce, Colorado: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 40.635536, -104.7552458 Show Map Loading map... "minzoom":false,"mappingservi...

  9. Boulder, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    (E2) Hogan & Hartson Registered Energy Companies in Boulder, Colorado A2BE Carbon Capture LLC Albeo Technologies Also Energy American Environmental Products American Solar...

  10. Wellington, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Wellington, Colorado: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 40.7038712, -105.0085856 Show Map Loading map... "minzoom":false,"mapping...