Powered by Deep Web Technologies
Note: This page contains sample records for the topic "ring status schedules" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Weekly Petroleum Status Report Schedule  

Gasoline and Diesel Fuel Update (EIA)

Weekly Petroleum Status Report Weekly Petroleum Status Report Release Schedule The wpsrsummary.pdf, overview.pdf, and Tables 1-14 in CSV and XLS formats, are released to the Web site after 10:30 a.m. (Eastern Time) on Wednesday. All other PDF and HTML files are released to the Web site after 1:00 p.m. (Eastern Time) on Wednesday. Appendix D is produced during the winter heating season, which extends from October through March of each year. For some weeks which include holidays, releases are delayed by one day. Holiday Release Schedule The standard release time and day of the week will be at 10:30 a.m. (Eastern time) on Wednesdays with the following exceptions. All times are Eastern. Data for the week ending Alternate Release Date Release Day Release Time Holiday October 11, 2013 October 21, 2013 Monday 10:30 a.m. Columbus/EIA Closed

2

Status of the SLC damping rings  

SciTech Connect (OSTI)

Electron beams of full design energy 1.21 GeV and nearly full design intensity 4 x 10/sup 10/ particles/pulse (design 5 x 10/sup 10/) have been extracted from the Stanford Linac and successfully stored in the electron damping ring. Beams of less intensity have been extracted from the ring and reinjected into the Linac. The present intensity limits are not thought to be fundamental. The operating experience with the electron ring and the status of the construction of the positron ring will be discussed. 11 refs., 1 fig., 2 tabs.

Hutton, A.M.; Davies-White, W.A.; Delahaye, J.P.; Fieguth, T.H.; Hofmann, A.; Jager, J.; Kloeppel, P.K.; Lee, M.J.; Linebarger, W.A.; Rivkin, L.

1985-06-01T23:59:59.000Z

3

The PEP-II Project: Low-Energy Ring Design and Project Status  

SciTech Connect (OSTI)

We describe the present status of the PEP-II project. The project comprises four major systems: Injector, High-Energy Ring (HER), Low-Energy Ring (LER), and Interaction Region (IR). We focus in detail on the design of the LER, as its parameters and requirements are most closely related to those required for the Beijing Tau-Charm Factory rings. The PEP-II LER is a high-current, 3.1-GeV positron ring mounted above the 9-GeV HER. The LER uses a wiggler located in one of its six straight sections to provide emittance control and additional damping. We describe the rather complicated IR, which must transport the LER beam into the plane of the HER, focus it to a common beam size, and separate the beams after the head-on collisions. Both permanent magnet and conventional electromagnets are used in this area. The LER lattice has now adopted a simplified non-interleaved sextupole correction scheme that has reduced the required number of sextupoles substantially. We describe the LER vacuum system, one of the most challenging subsystems in PEP-II. It employs several technologies. In the arcs, aluminum extrusions and titanium sublimation pumps are employed; the straight sections use stainless steel chambers with lumped ion pumps. In the wiggler area, an extended copper photon dump with nonevaporable getter (NEG) pumps is employed to handle the very large synchrotron radiation power. The design of the room-temperature RF system, the bunch-by-bunch longitudinal and transverse feedback systems, and some of the special diagnostics will be described briefly. The PEP-II project remains on schedule to begin commissioning of the HER in April 1997, followed by the LER a year later.

Zisman, Michael S.

2006-01-02T23:59:59.000Z

4

Status of Studies of Achromat-based 6D Ionization Cooling Rings for Muons  

SciTech Connect (OSTI)

Six dimensional ionization cooling of muons is needed to achieve the necessary luminosity for a muon collider. If that cooling could occur over multiple turns in a closed ring, there would be significant cost savings over a single-pass cooling channel. We report on the status of a cooling ring with achromatic arcs. The achromatic design permits the design to easily switch between a closed ring and a snaking geometry on injection or extraction from the ring. The ring is designed with sufficient space in each superperiod for injection and extraction magnets. We describe the ring's lattice design, performance, and injection/extraction requirements.

Ding, X.; Kirk, H.; Cline, D.; Garren, A.A.; Berg, J.S.

2011-09-04T23:59:59.000Z

5

Schedules  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Schedules Schedules Schedules Print Current Long-Term Operating Schedule August-December 2013 Upcoming Long-Term Operating Schedule January-July 2014 New! ALS Operating Schedule on Google Calendar Past Long-Term Operating Schedules January-July 2013 July-December 2012 January-June 2012 July-December 2011 January-June 2011 July-December 2010 January-June 2010 July-December 2009 January-June 2009 July-December 2008 January-June 2008 July-December 2007 February-June 2007 July 2006-February 2007 January-June 2006 July-December 2005 January-June 2005 June-December 2004 December 2003-May 2004 June 2003-November 2003 December 2002-May 2003 June 2002-November 2002 December 2001-May 2002 May 2001-December 2001 January 2001-April 2001 July 2000-December 2000 January 2000-June 2000 April 1999-December 1999

6

Status Report on the Development of Micro-Scheduling Software for the Advanced Outage Control Center Project  

SciTech Connect (OSTI)

The long-term viability of existing nuclear power plants (NPPs) in the United States (U.S.) is dependent upon a number of factors, including maintaining high capacity factors, maintaining nuclear safety, and reducing operating costs, particularly those associated with refueling outages. Refueling outages typically take 20-30 days, and for existing light water NPPs in the U.S., the reactor cannot be in operation during the outage. Furthermore, given that many NPPs generate between $1-1.5 million/day in revenue when in operation, there is considerable interest in shortening the length of refueling outages. Yet, refueling outages are highly complex operations, involving multiple concurrent and dependent activities that are difficult to coordinate. Finding ways to improve refueling outage performance while maintaining nuclear safety has proven to be difficult. The Advanced Outage Control Center project is a research and development (R&D) demonstration activity under the Light Water Reactor Sustainability (LWRS) Program. LWRS is a R&D program which works with industry R&D programs to establish technical foundations for the licensing and managing of long-term, safe, and economical operation of current NPPs. The Advanced Outage Control Center project has the goal of improving the management of commercial NPP refueling outages. To accomplish this goal, this INL R&D project is developing an advanced outage control center (OCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. This report describes specific recent efforts to develop a capability called outage Micro-Scheduling. Micro-Scheduling is the ability to allocate and schedule outage support task resources on a sub-hour basis. Micro-Scheduling is the real-time fine-tuning of the outage schedule to react to the actual progress of the primary outage activities to ensure that support task resources are optimally deployed with the least amount of delay and unproductive use of resources. The remaining sections of this report describe in more detail the scheduling challenges that occur during outages, how a Micro-Scheduling capability helps address those challenges, and provides a status update on work accomplished to date and the path forward.

Shawn St. Germain; Kenneth Thomas; Ronald Farris; Jeffrey Joe

2014-09-01T23:59:59.000Z

7

FIFTH INTERIM STATUS REPORT: MODEL 9975 PCV O-RING FIXTURE LONG-TERM LEAK PERFORMANCE  

SciTech Connect (OSTI)

A series of experiments to monitor the aging performance of Viton{sup reg.} GLT O-rings used in the Model 9975 package has been ongoing for six years at the Savannah River National Laboratory. Sixty-seven mock-ups of 9975 Primary Containment Vessels (PCVs) were assembled and heated to temperatures ranging from 200 to 450 F. They were leak-tested initially and have been tested at nominal six month intervals to determine if they meet the criterion of leaktightness defined in ANSI standard N14.5-97. Fourteen additional tests were initiated in 2008 with GLT-S O-rings heated to temperatures ranging from 200 to 400 F. High temperature aging continues for 36 GLT O-ring fixtures at 200--350 F. Room temperature leak test failures have been experienced in 5 of the GLT O-ring fixtures aging at 300 and 350 F, and in all 3 of the GLT O-ring fixtures aging at higher temperatures. No failures have yet been observed in GLT O-ring fixtures aging at 200 F for 30--48 months, which is still bounding to O-ring temperatures during storage in KAMS. High temperature aging continues for 6 GLT-S O-ring fixtures at 200--300 F. Room temperature leak test failures have been experienced in all 8 of the GLT-S O-ring fixtures aging at 350 and 400 F. No failures have yet been observed in GLT-S O-ring fixtures aging at 200 or 300 F for 19 months. For O-ring fixtures that have failed the room temperature leak test and been disassembled, the O-rings displayed a compression set ranging from 51--95%. This is significantly greater than seen to date for packages inspected during KAMS field surveillance (23% average). For GLT O-rings, service life based on the room temperature leak rate criterion is comparable to that predicted by compression stress relaxation (CSR) data at higher temperatures (350--400 F). While there are no comparable failure data yet at aging temperatures below 300 F, extrapolations of the data for GLT O-rings suggests that CSR model predictions provide a conservative prediction of service life relative to the leak rate criterion. Failure data at lower temperatures is needed to verify this apparent trend. Insufficient failure data exist currently to perform a similar comparison for GLT-S O-rings. Aging and periodic leak testing will continue for the remaining fixtures.

Daugherty, W.; Hoffman, E.

2010-11-01T23:59:59.000Z

8

FIFTH INTERIM STATUS REPORT: MODEL 9975 PCV O-RING FIXTURE LONG-TERM LEAK PERFORMANCE  

SciTech Connect (OSTI)

A series of experiments to monitor the aging performance of Viton{reg_sign} GLT O-rings used in the Model 9975 package has been ongoing for six years at the Savannah River National Laboratory. Sixty-seven mock-ups of 9975 Primary Containment Vessels (PCVs) were assembled and heated to temperatures ranging from 200 to 450 F. They were leak-tested initially and have been tested at nominal six month intervals to determine if they meet the criterion of leaktightness defined in ANSI standard N14.5-97. Fourteen additional tests were initiated in 2008 with GLT-S O-rings heated to temperatures ranging from 200 to 400 F. High temperature aging continues for 36 GLT O-ring fixtures at 200-350 F. Room temperature leak test failures have been experienced in 6 of the GLT O-ring fixtures aging at 300 and 350 F, and in all 3 of the GLT O-ring fixtures aging at higher temperatures. No failures have yet been observed in GLT O-ring fixtures aging at 200 F for 30-48 months, which is still bounding to O-ring temperatures during storage in KAMS. High temperature aging continues for 6 GLT-S O-ring fixtures at 200-300 F. Room temperature leak test failures have been experienced in all 8 of the GLT-S O-ring fixtures aging at 350 and 400 F. No failures have yet been observed in GLT-S O-ring fixtures aging at 200 or 300 F for 19 months. For O-ring fixtures that have failed the room temperature leak test and been disassembled, the Orings displayed a compression set ranging from 51-95%. This is significantly greater than seen to date for packages inspected during KAMS field surveillance (23% average). For GLT O-rings, service life based on the room temperature leak rate criterion is comparable to that predicted by compression stress relaxation (CSR) data at higher temperatures (350-400 F). While there are no comparable failure data yet at aging temperatures below 300 F, extrapolations of the data for GLT O-rings suggests the CSR model predictions provide a conservative prediction of service life relative to the leak rate criterion. Failure data at lower temperatures are needed to verify this apparent trend. Insufficient failure data exist currently to perform a similar comparison for GLT-S O-rings. Aging and periodic leak testing will continue for the remaining fixtures.

Daugherty, W.; Hoffman, E.

2011-04-11T23:59:59.000Z

9

NINTH INTERIM STATUS REPORT: MODEL 9975 PCV O-RING FIXTURE LONG-TERM LEAK PERFORMANCE  

SciTech Connect (OSTI)

A series of experiments to monitor the aging performance of Viton GLT O-rings used in the Model 9975 package has been ongoing since 2004 at the Savannah River National Laboratory. One approach has been to periodically evaluate the leak performance of O-rings being aged in mock-up 9975 Primary Containment Vessels (PCVs) at elevated temperatures. Other methods such as compression-stress relaxation (CSR) tests and field surveillance are also on-going to evaluate O-ring behavior. Seventy tests using PCV mock-ups were assembled and heated to temperatures ranging from 200 to 450 F. They were leak-tested initially and have been tested periodically to determine if they continue to meet the leak-tightness criterion defined in ANSI standard N14.5-97. Due to material substitution, fourteen additional tests were initiated in 2008 with GLT-S O-rings heated to temperatures ranging from 200 to 400 F. High temperature aging continues for 23 GLT O-ring fixtures at 200 270 F. Room temperature leak test failures have been experienced in all of the GLT O-ring fixtures aging at 350 F and higher temperatures, and in 8 fixtures aging at 300 F. The earliest 300 F GLT O-ring fixture failure was observed at 34 months. The remaining GLT O-ring fixtures aging at 300 F have been retired from testing following more than 5 years at temperature without failure. No failures have yet been observed in GLT O-ring fixtures aging at 200 F for 72 - 96 months, which bounds O-ring temperatures anticipated during storage in K-Area Complex (KAC). Based on expectations that the 200 F fixtures will remain leak-tight for a significant period yet to come, 2 additional fixtures began aging in 2011 at 270 F, with hopes that they may reach a failure condition before the 200 F fixtures, thus providing additional time to failure data. High temperature aging continues for 6 GLT-S O-ring fixtures at 200 300 F. Room temperature leak test failures have been experienced in all 8 of the GLT-S O-ring fixtures aging at 350 and 400 F. No failures have yet been observed in GLT-S O-ring fixtures aging at 200 - 300 F for 54 - 57 months. No additional O-ring failures have been observed since the last interim report was issued. Aging and periodic leak testing will continue for the remaining PCV fixtures. Additional irradiation of several fixtures is recommended to maintain a balance between thermal and radiation exposures similar to that experienced in storage, and to show the degree of consistency of radiation response between GLT and GLT-S O-rings.

Daugherty, W.

2014-08-06T23:59:59.000Z

10

SIXTH INTERIM STATUS REPORT: MODEL 9975 PCV O-RING FIXTURE LONG-TERM LEAK PERFORMANCE  

SciTech Connect (OSTI)

A series of experiments to monitor the aging performance of Viton{reg_sign} GLT O-rings used in the Model 9975 package has been ongoing for seven years at the Savannah River National Laboratory. Seventy tests using mock-ups of 9975 Primary Containment Vessels (PCVs) were assembled and heated to temperatures ranging from 200 to 450 F. They were leak-tested initially and have been tested periodically to determine if they meet the criterion of leak-tightness defined in ANSI standard N14.5-97. Fourteen additional tests were initiated in 2008 with GLT-S O-rings heated to temperatures ranging from 200 to 400 F. High temperature aging continues for 33 GLT O-ring fixtures at 200-300 F. Room temperature leak test failures have been experienced in all of the GLT O-ring fixtures aging at 350 F and higher temperatures, and in 7 fixtures aging at 300 F. No failures have yet been observed in GLT O-ring fixtures aging at 200 F for 41-60 months, which is still bounding to O-ring temperatures during storage in K-Area Complex (KAC). Based on expectations that the fixtures aging at 200 F will remain leak-tight for a significant period yet to come, 2 additional fixtures began aging within the past year at an intermediate temperature of 270 F, with hopes that they may leak before the 200 F fixtures. High temperature aging continues for 6 GLT-S O-ring fixtures at 200-300 F. Room temperature leak test failures have been experienced in all 8 of the GLT-S O-ring fixtures aging at 350 and 400 F. No failures have yet been observed in GLT-S O-ring fixtures aging at 200-300 F for up to 26 months. For O-ring fixtures that have failed the room temperature leak test and been disassembled, the Orings displayed a compression set ranging from 51-96%. This is greater than seen to date for packages inspected during KAC field surveillance (24% average). For GLT O-rings, separate service life estimates have been made based on the O-ring fixture leak test data and based on compression stress relaxation (CSR) data. These two predictive models show reasonable agreement at higher temperatures (350-400 F). However, at 300 F, the room temperature leak test failures to date experienced longer aging times than predicted by the CSR-based model. This suggests that extrapolations of the CSR model predictions to temperatures below 300 F will provide a conservative prediction of service life relative to the leak rate criterion. Leak test failure data at lower temperatures are needed to verify this apparent trend. Insufficient failure data exist currently to perform a similar comparison for GLT-S O-rings. Aging and periodic leak testing will continue for the remaining fixtures.

Daugherty, W.

2011-08-31T23:59:59.000Z

11

STATUS REPORT FOR AGING STUDIES OF EPDM O-RING MATERIAL FOR THE H1616 SHIPPING PACKAGE  

SciTech Connect (OSTI)

This is an interim status report for tasks carried out per Task Technical Plan SRNL-STI-2011-00506. A series of tasks/experiments are being performed at the Savannah River National Laboratory to monitor the aging performance of ethylene propylene diene monomer (EPDM) Orings used in the H1616 shipping package. The data will support the technical basis to extend the annual maintenance of the EPDM O-rings in the H1616 shipping package and to predict the life of the seals at bounding service conditions. Current expectations are that the O-rings will maintain a seal at bounding normal temperatures in service (152 F) for at least 12 months. The baseline aging data review suggests that the EPDM O-rings are likely to retain significant mechanical properties and sealing force at bounding service temperatures to provide a service life of at least 2 years. At lower, more realistic temperatures, longer service life is likely. Parallel compression stress relaxation and vessel leak test efforts are in progress to further validate this assessment and quantify a more realistic service life prediction. The H1616 shipping package O-rings were evaluated for baseline property data as part of this test program. This was done to provide a basis for comparison of changes in material properties and performance parameters as a function of aging. This initial characterization was limited to physical and mechanical properties, namely hardness, thickness and tensile strength. These properties appear to be consistent with O-ring specifications. Three H1616-1 Containment Vessels were placed in test conditions and are aging at temperatures ranging from 160 to 300 F. The vessels were Helium leak-tested initially and have been tested at periodic intervals after cooling to room temperature to determine if they meet the criterion of leaktightness defined in ANSI standard N14.5-97 (< 1E-07 std cc air/sec at room temperature). To date, no leak test failures have occurred. The cumulative time at temperature ranges from 174 days for the 300 F vessel to 189 days for the 160 F vessel as of 8/1/2012. The compression stress-relaxation (CSR) behavior of H1616 shipping package O-rings is being evaluated to develop an aging model based on material properties. O-ring segments were initially aged at four temperatures (175 F, 235 F, 300 F and 350 F). These temperatures were selected to bound normal service temperatures and to challenge the seals within a reasonable aging period. Currently, samples aging at 300 F and 350 F have reached the mechanical failure point (end of life) which is defined in this study as 90% loss of initial sealing force. As a result, additional samples more recently began aging at {approx}270 F to provide additional data for the aging model. Aging and periodic leak testing of the full containment vessels, as well as CSR testing of O-ring segments is ongoing. Continued testing per the Task Technical Plan is recommended in order to validate the assumptions outlined in this status report and to quantify and validate the long-term performance of O-ring seals under actual service conditions.

Stefek, T.; Daugherty, W.; Skidmore, E.

2012-08-31T23:59:59.000Z

12

Live Status  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

For Users For Users Live Status Global Queue Look Scheduled Outages Outage Log Edison Login Node Status Hopper Login Node Status Hopper User Environment Monitoring Carver Login Node Status PDSF Login Node Status PDSF Monitoring Science Gateway Status Now Computing Highlights My NERSC Getting Started Computational Systems Data & File Systems Network Connections Queues and Scheduling Job Logs & Analytics Training & Tutorials Software Accounts & Allocations Policies Data Analytics & Visualization Data Management Policies Science Gateways User Surveys NERSC Users Group User Announcements Help Operations for: Passwords & Off-Hours Status 1-800-66-NERSC, option 1 or 510-486-6821 Account Support https://nim.nersc.gov accounts@nersc.gov 1-800-66-NERSC, option 2 or 510-486-8612

13

Live Status  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Global Queue Look Scheduled Outages Outage Log Edison Login Node Status Hopper Login Node Status Hopper User Environment Monitoring Carver Login Node Status PDSF Login Node Status PDSF Monitoring Science Gateway Status Now Computing Highlights My NERSC Getting Started Computational Systems Data & File Systems Network Connections Queues and Scheduling Job Logs & Analytics Training & Tutorials Software Accounts & Allocations Policies Data Analytics & Visualization Data Management Policies Science Gateways User Surveys NERSC Users Group User Announcements Help Operations for: Passwords & Off-Hours Status 1-800-66-NERSC, option 1 or 510-486-6821 Account Support https://nim.nersc.gov accounts@nersc.gov 1-800-66-NERSC, option 2 or 510-486-8612 Consulting http://help.nersc.gov

14

The Fermilab recycler ring  

SciTech Connect (OSTI)

The Fermilab Recycler is a permanent magnet storage ring for the accumulation of antiprotons from the Antiproton Source, and the recovery and cooling of the antiprotons remaining at the end of a Tevatron store. It is an integral part of the Fermilab III luminosity upgrade. The following paper describes the design features, operational and commissioning status of the Recycler Ring.

Martin Hu

2001-07-24T23:59:59.000Z

15

AD-7/GBAR status report for the 2015 CERN SPSC  

E-Print Network [OSTI]

The GBAR experiment will use one of the low energy antiproton beam lines from the ELENA ring that is being prepared and scheduled to start operating in 2017. The apparatus is broadly divided into four sections: antiproton deceleration and focussing, positron production and accumulation, antihydrogen cooling and preparation, and detection. In the following, we give updates on the different parts and the status of preparation for installation in the AD hall, referring to the previous report that was submitted in April of 2014

Banerjee, D; Brook-Roberge, D; Charlton, M; Clad, P; Comini, P; Crivelli, P; Dalkarov, O; Debu, P; Douillet, A; Dufour, G; Dupr, P; Eriksson, S; Froelich, P; Grandemange, P; Guellati, S; Gurout, R; Heinrich, J-M; Hervieux, P-A; Hilico, L; Husson, A; Indelicato, P; Jonsell, S; Karr, J-P; Khabarova, K; Kolachevsky, N; Kuroda, N; Lambrecht, A; Leite, A M M; Liszkay, L; Lotrus, P; Lunney, D; Madsen, N; Manfredi, G; Mansouli, B; Matsuda, Y; Mohri, A; Mortensen, T; Nagashima, Y; Nesvizhevsky, V; Nez, F; Prez, P; Regenfus, C; Rey, J-M; Reymond, J-M; Rouss, J-Y; Reynaud, S; Rubbia, A; Sacquin, Y; Schmidt-Kaler, F; Sillitoe, N; Staszczak, M; Szabo-Foster, C I; Torii, H; Vallage, B; Valdes, M; van der Werf, D P; Voronin, A; Walz, J; Wolf, S; Wronka, S; Yamazaki, Y

2015-01-01T23:59:59.000Z

16

The Schedule  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The schedule is one of the building blocks for project development. A schedule helps determine the duration of the project, the critical activities, and when funds are required. This chapter will briefly discuss some scheduling basics.

1997-03-28T23:59:59.000Z

17

Rate Schedules  

Broader source: Energy.gov [DOE]

One of the major responsibilities of Southeastern is to design, formulate, and justify rate schedules. Repayment studies prepared by the agency determine revenue requirements and appropriate rate...

18

NSLS VUV Storage Ring  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

VUV Storage Ring VUV Storage Ring VUV Normal Operations Operating Parameters (pdf) Insertion Devices Flux & Brightness Orbit Stability Lattice Information (pdf) Lattice : MAD Dataset Mechanical Drawing (pdf) VUV Operating Schedule Introduction & History The VUV Ring at the National Synchrotron Light Source was one of the first of the 2nd generation light sources to operate in the world. Initially designed in 1976 the final lattice design was completed in 1978 shortly after funding was approved. Construction started at the beginning of FY 1979 and installation of the magnets was well underway by the end of FY 1980. The first stored beam was achieved in December of 1981 at 600 MeV and the first photons were delivered to beamlines in May 1982, with routine beam line operations underway by the start of FY 1983. The number of beam

19

Storage Ring Operation Modes  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Longitudinal bunch profile and Up: APS Storage Ring Parameters Longitudinal bunch profile and Up: APS Storage Ring Parameters Previous: Source Parameter Table Storage Ring Operation Modes Standard Operating Mode, top-up Fill pattern: 102 mA in 24 singlets (single bunches) with a nominal current of 4.25 mA and a spacing of 153 nanoseconds between singlets. Lattice configuration: Low emittance lattice with effective emittance of 3.1 nm-rad and coupling of 1%. Bunch length (rms): 33.5 ps. Refill schedule: Continuous top-up with single injection pulses occurring at a minimum of two minute intervals, or a multiple of two minute intervals. Special Operating Mode - 324 bunches, non top-up Fill pattern: 102 mA in 324 uniformly spaced singlets with a nominal single bunch current of 0.31 mA and a spacing of 11.37 nanoseconds between singlets.

20

ADMINISTRATIVE RECORDS SCHEDULE 23: ADMINISTRATIVE RECORDS SCHEDULE...  

Broader source: Energy.gov (indexed) [DOE]

ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES ADMINISTRATIVE RECORDS SCHEDULE 23: ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES This...

Note: This page contains sample records for the topic "ring status schedules" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

SI Group Scheduling Page  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Personnel On-Call Page Beamline Validation Schedule Group Organizational Chart Reviews Presentations Group Scheduling Page Project Scheduling Information Ops Scheduling Info Project / Scheduling Info APS fy2005 Annual Schedule ( html ) PSS Validation Schedule APS fy2006 Annual Schedule (html) PSS Validation Teams Latest Machine Studies Schedule (pdf) (html) New Builds Schedule (For SI GROUP Reference Only) Parasitic Beam Operations Schedule Ops Scheduling Page Shutdown Information Work Schedules August/September Shutdown Shutdown Work List Validation Schedule Safety Info Work Request Links ISM Core Functions Enter / Search Work Requests APS Safety Page Modify / Approve Work Requests Radiation Safety Policy APS TMS Training Profiles MSDS Search This page maintained by Joe Budz

22

Rate schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Firm Power Service Provided by Rate/Charges Firm Power Service Provided by Rate/Charges Rate/Charges Effective Through (or until superceded) Firm Sales (SLIP-F9) Composite Rate SLIP 29.62 mills/kWh 9/30/2015 Demand Charge SLIP $5.18/kW-month 9/30/2015 Energy Charge SLIP 12.19 mills/kWh 9/30/2015 Cost Recovery Charge (CRC) SLIP 0 mills/kWh 9/30/2015 Transmission Service Provided by Current Rates effective10/12 - 9/15 (or until superceded) Rate Schedule Effective Through Firm Point-to-Point Transmission (SP-PTP7) CRSP $1.14 per kW-month $13.69/kW-year $0.00156/kW-hour $0.04/kW-day $0.26/kW-week 10/1/2008-9/30/2015 Network Integration Transmission (SP-NW3) CRSP see rate schedule 10/1/2008-9/30/2015 Non-Firm Point-to-Point Transmission (SP-NFT6) CRSP see rate schedule 10/1/2008-9/30/2015 Ancillary Services Provided by Rate Rate Schedule

23

Presentation Schedule  

Broader source: Energy.gov (indexed) [DOE]

Presentation Schedule Presentation Schedule (30 Min) Dave Wade - Dose Comparisons of once-thru and closed fuel cycles. (30 Min) Ralph Bennett - Roadmap Overview (15 Min) Neil Todreas - GRNS Perspectives and Recommendations (75 Min) Neil Todreas / - NERAC DISCUSSION Sal Levy 2 Generation IV Roadmap NERAC Subcommittee (GRNS) Bobby Abrams* Duke Engineering Douglas Chapin MPR Associates B. John Garrick Independent Consultant Dan Kammen University of California- Berkeley 3 Salomon Levy ** Levy & Associates Ted Marston Electrical Power Research Institute Bill Naughton Exelon Neil Todreas ** Massachusetts Institute of Technology * Resigned, July 2002 ** Co-chair GRNS Recruited Working Group Co-Chairs Jack Devine TWG-1 Water Cooled Phil Hildebrandt TWG-2 Gas Cooled Steve Rosen TWG-3 Metal Cooled Bill Rasin

24

Shifts & Schedules  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Shifts & Schedules This page provides links to the various shifts and schedules that are used by the User ESH Support Group. FC Shift Schedule This page lists the current Operational Shift Schedule for the Floor Coordinators. FC DOR Schedule This page lists the current DOR Schedule for the Floor Coordinators. FC Off Shift Pager Schedule This tool lists the current schedule for the Floor Coordinator carring the 0101 during APS Shutdown periods. Long Range Operations Schedule This page lists the schedule of Operations for the current APS fiscal year. Machine Studies Schedule This page lists the current schedule of Operations for the Accelerator Systems during Machine Studies. PSS Validation Schedule This page lists the beamlines currently scheduled to have their Personnel Safety Systems validated.

25

Routine Operational Environmental Monitoring schedule, CY 1994  

SciTech Connect (OSTI)

This document provides Health Physics (HP) a schedule in accordance with the Environmental Compliance Manual, WHC-CM-7-5, of monitoring and sampling routines for the Operational Environmental Monitoring (OEM) Program during calendar year (CY) 1994. The survey frequencies for particular sites are determined by the technical judgment of EES and may depend on the site history, radiological status, use, and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive waste sites are scheduled to be surveyed annually at a minimum. Any newly discovered waste sites not documented by this schedule will be included in the revised schedule for CY 1995. This schedule does not discuss the manpower needs nor does it list the monitoring equipment to be used in completing specific routines.

Schmidt, J.W.

1993-12-01T23:59:59.000Z

26

PROVOST CHALLENGE OVERVIEW STATUS REPORT  

E-Print Network [OSTI]

PROVOST CHALLENGE OVERVIEW STATUS REPORT December 2013 # Project Status Project Name · Project Lead report) Joyce O'Halloran and Rachel Webb, The Fariborz Maseeh Department of Mathematics and Statistics 54 ON SCHEDULE Online Academic Advising & Career Development Modules. (Link to detailed report) Mary Ann Barham

Lafferriere, Gerardo

27

E-Print Network 3.0 - acid-induced status epilepticus Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

concentric ring electrodes for controlling pilocarpine generated status epilepticus in rats. Methods: Male... was able to control (modulate) status epilepticus ... Source: Besio,...

28

Status and Schedule | Advanced Photon Source  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

is ongoing. Dec, 14 2014 16:28:19 Sr orbit correction was restarted at 16:25 The BPM issue was resolved, and the SR orbit correction was restarted at 16:25 Dec, 14 2014...

29

Implementing Lottery Scheduling: Matching the Specializations in Traditional Schedulers  

E-Print Network [OSTI]

present in traditional non- real time process schedulers. Lottery scheduling enables flexible control over this while maintaining lottery scheduling's flexible control over relative execution rates and loadImplementing Lottery Scheduling: Matching the Specializations in Traditional Schedulers David

30

DOE Administrative Records Schedules Changes | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Administrative Records Schedules Changes DOE Administrative Records Schedules Changes Changes posted to Administrative Records Schedules DOE Administrative Records Schedules...

31

March 29, 2008 OS:CPU Scheduling 1 CPU Scheduling  

E-Print Network [OSTI]

control of the CPU to the process selected by the short-term scheduler. Its function involves: SwitchingMarch 29, 2008 OS:CPU Scheduling 1 CPU Scheduling #12;March 29, 2008 OS:CPU Scheduling 2 Objectives Basic Concepts + Scheduling Criteria + Scheduling Algorithms + Scheduling Algorithm Evaluation + Summary

Adam, Salah

32

BCDA Machine Status Link  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Machine Status Link Machine Status Link Version 1.33 (December 2005) David M. Kline. The Machine Status Link (MSL) is responsible for distributing the digitized beam current, injection status, P0 clock, and other statuses over a single fiber to several locations around the Storage Ring. The MRD100 is a VME-based module that is part of the MSL and was specifically designed for the APS. It receives and interprets information from the XMS100 module by means of copper or fiber. Signals from the XMS100 module are sent at a P0 rate (3.667 microseconds). It sends two registers every cycle and all in about 12 cycles. Refer to the ASD website for additional information regarding the MSL. The focus of this page is to provide information of how to configure the MRD100 for a beamline IOC and to discuss the sample IOC

33

Disposition Schedules | Department of Energy  

Office of Environmental Management (EM)

Disposition Schedules Disposition Schedules The DOE Records Disposition Schedules provide the authority for the transfer, or disposal of records created and maintained by the...

34

SSRL- Experimental Run Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

FY2008 Experimental Run Schedules 2008 Run Ends August 11, 2008. User Operations will resume November 2008. Operating Maintenance Beam Line Schedule FY2009 FY2008 X-ray (1-4,...

35

SRI2007 Conference - Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Home Registration Abstract Submission Proceedings Manuscript Review Conference Schedule Poster Session Satellite Workshops Conference Committee Accommodations Vendors Travel tips...

36

Stirling engine piston ring  

DOE Patents [OSTI]

A piston ring design for a Stirling engine wherein the contact pressure between the piston and the cylinder is maintained at a uniform level, independent of engine conditions through a balancing of the pressure exerted upon the ring's surface and thereby allowing the contact pressure on the ring to be predetermined through the use of a preloaded expander ring.

Howarth, Roy B. (Clifton Park, NY)

1983-01-01T23:59:59.000Z

37

SLAC - KEK: ISG8 Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Agenda Agenda ISG8 Home Page Working Groups: WG1: Parameters, Design, Instrumentation and Tuning, Bldg.212 Cascades Conference Rm. WG2: Damping Rings and ATF, Bldg.214 Fuji Conference Rm WG3: RF Sources, Orange Rm (half) WG4:Structures, Orange Rm (half) WG5: Ground Motion; Site Requirements and Investigations, Bldg.281 Conventional Facilities Rm. Monday: 09:00 Plenary Sessions (Auditorium) Welcome - J. Dorfan Views from KEK - K. Takata TRC News - G. Loew Goals for ISG-8 - D. Burke / N. Toge Working Group Plans (5 min ea) - WG Conveners 11:00 Working Group Sessions 12:00 Lunch 13:30 Working Group Sessions Tuesday: 09:00 Daily Schedule Update (Orange Rm) - WG Conveners (5min ea) 09:30 Working Group Sessions 12:00 Lunch 13:30 Working Group Sessions Wednesday:

38

A pipeline scheduling model  

E-Print Network [OSTI]

A PIPELINE SCHEDULING MODEL A Thesis by THOMAS MELVIN BEATTY Submitted to the Graduate College of Texas AAM University in partial fulfillment of the requirement for the degree of MASTER QF SCIENCE August 1975 Major Subject: Computing... Science R PIPELINE SCHEDULING MODEL A Thesis by THOMAS MELVIN BEATTY Approved as to style and content by: Chairman of ommittee Member (Head o f Department ) Member August 1975 ABSTRACT A PIPELINE SCHEDULING MODEL (August 1975) Thomas Melvin...

Beatty, Thomas Melvin

2012-06-07T23:59:59.000Z

39

ADMINISTRATIVE RECORDS SCHEDULE 6: ACCOUNTABLE OFFICERS' ACCOUNTS...  

Office of Environmental Management (EM)

ADMINISTRATIVE RECORDS SCHEDULE 6: ACCOUNTABLE OFFICERS' ACCOUNTS RECORDS ADMINISTRATIVE RECORDS SCHEDULE 6: ACCOUNTABLE OFFICERS' ACCOUNTS RECORDS This schedule covers accountable...

40

Bicycling Black Rings  

E-Print Network [OSTI]

We present detailed physics analyses of two different 4+1-dimensional asymptotically flat vacuum black hole solutions with spin in two independent planes: the doubly spinning black ring and the bicycling black ring system ("bi-rings"). The latter is a new solution describing two concentric orthogonal rotating black rings which we construct using the inverse scattering technique. We focus particularly on extremal zero-temperature limits of the solutions. Such limits exist for both types of solutions; for the bi-rings it is obtained when the two rings drag each other to extremality through the effect of gravitational frame-dragging. We construct the phase diagram of currently known zero-temperature vacuum black hole solutions with a single event horizon, and discuss the non-uniqueness introduced by more exotic black hole configurations such as bi-rings and multi-ring saturns.

Elvang, Henriette

2008-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "ring status schedules" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

ADMINISTRATIVE RECORDS SCHEDULE 23:  

Broader source: Energy.gov (indexed) [DOE]

ADMINISTRATIVE RECORDS SCHEDULE 23: ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES June 2007 Revision 1 This schedule provides for the disposal of certain records common to most offices. It covers administrative subject files; facilitative records such as suspense files, tracking and control records, calendars, and indexes; and documents of transitory value. This schedule does not apply to any materials determined to be non-record or to materials such as calendars or work schedules claimed as personal. Office Administrative Files described under item 1 are records retained by an originating office as its record of initiation of an action, request, or response to requests for information. This item may be applied only to separate administrative files containing such records as copies of

42

Definition: Dynamic Interchange Schedule Or Dynamic Schedule | Open Energy  

Open Energy Info (EERE)

Schedule Or Dynamic Schedule Schedule Or Dynamic Schedule Jump to: navigation, search Dictionary.png Dynamic Interchange Schedule Or Dynamic Schedule A telemetered reading or value that is updated in real time and used as a schedule in the AGC/ACE equation and the integrated value of which is treated as a schedule for interchange accounting purposes. Commonly used for scheduling jointly owned generation to or from another Balancing Authority Area.[1] Related Terms balancing authority, balancing authority area, smart grid References ↑ Glossary of Terms Used in Reliability Standards An in LikeLike UnlikeLike You like this.Sign Up to see what your friends like. line Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Dynamic_Interchange_Schedule_Or_Dynamic_Schedule&oldid=502492

43

2014 CAMD Users Meeting Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Schedule Friday, April 25th, 2014 LTRC Transportation Training and Education Center (TTEC), 4099 Gourrier Avenue Printable Schedule here 8:00 - 8:30 - REGISTRATION Morning Session...

44

Reclaimer Scheduling: Complexity and Algorithms  

E-Print Network [OSTI]

Feb 17, 2014 ... Abstract: We study a number of variants of an abstract scheduling problem inspired by the scheduling of reclaimers in the stockyard of a coal...

Enrico Angelelli

2014-02-17T23:59:59.000Z

45

ADMINISTRATIVE RECORDS SCHEDULE 22:  

Broader source: Energy.gov (indexed) [DOE]

ADMINISTRATIVE RECORDS SCHEDULE 22: ADMINISTRATIVE RECORDS SCHEDULE 22: AUDIT/INVESTIGATIVE RECORDS June 2007 Revision 1 Section I of this schedule covers records associated with investigations other than those performed by the Office of the Inspector General (OIG). Types of investigations may include: routine and significant internal program investigations, specific purpose investigations, audits, inspections, appraisals, and management reviews. Investigations may be described or referred to as audits, appraisals, surveillance, self-assessments, management assessments, or evaluations. Investigations may be conducted by DOE or by its contractors. Section II covers records created by the Department's OIG investigations. OIG investigations serve to prevent or reduce waste and fraud in Departmental programs,

46

ADMINISTRATIVE RECORDS SCHEDULE 16:  

Broader source: Energy.gov (indexed) [DOE]

2 2 ADMINISTRATIVE RECORDS SCHEDULE 16: ADMINISTRATIVE MANAGEMENT RECORDS June 2007 Revision 1 This schedule covers those administrative management activities not covered by other Administrative Schedules. Included are disposable records created in the course of organizational planning, development, and simplification of procedures; records management activities; and administration of management improvement programs. See ADM 1 (items 12 and 13) for the disposition of case files on individuals involved in incentive award and similar types of management improvement programs. The organizational locations and titles of administrative management units vary. They may be scattered at numerous levels or locations, or may be centralized. For the purposes

47

ADMINISTRATIVE RECORDS SCHEDULE 11:  

Broader source: Energy.gov (indexed) [DOE]

ADMINISTRATIVE RECORDS SCHEDULE 11: ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS June 2007 Revision 1 This schedule provides for the disposal of all copies, wherever located in the Department, of records relating to space and maintenance, except as indicated below. Records documenting these functions pertain to the acquisition, allocation, utilization, and release of space and include related correspondence and reports submitted to the General Services Administration (or equivalent agency with similar Government-wide responsibilities) as directed by law and regulation (41 CFR 101-17); correspondence and forms relating to the compilation of directory service listings; identification credentials and related accountable records; requests for building and equipment services;

48

Administrative Records Schedule: Communication Records | Department...  

Office of Environmental Management (EM)

Administrative Records Schedule: Communication Records Administrative Records Schedule: Communication Records The principal records documenting communication function...

49

Implementing Lottery Scheduling: Matching the Specializations Traditional Schedulers  

E-Print Network [OSTI]

in traditional non­ real time process schedulers. Lottery scheduling enables flexible control over relative. We achieve this while maintaining lottery scheduling's flexible control over relative execution rates a recently troduced proportional­share scheduler that enables flexible control over relative rates which CPU

50

Symmetry in Scheduling Problems  

E-Print Network [OSTI]

Nov 16, 2010 ... one is determining production schedules for identical machines. ...... j(t)) gives the cost of generator j producing pj(t) units of electricity at time t.

2010-11-16T23:59:59.000Z

51

ADMINISTRATIVE RECORDS SCHEDULE 21:  

Broader source: Energy.gov (indexed) [DOE]

ADMINISTRATIVE RECORDS SCHEDULE 21: AUDIOVISUAL RECORDS June 2007 Revision 1 This schedule covers audiovisual and related records created by or for Department and those acquired in the normal course of business. For audiovisual records that are not described in this schedule, an SF 115, Request for Records Disposition Authority, must be submitted to the National Archives and Records Administration (NARA). Audiovisual records include still and motion picture photography, graphic materials, and sound and video recordings. Related documentation includes (1) production files or other files documenting the creation, justification, ownership, and rights to the records and (2) finding aids used to identify or access the records. This schedule does not cover: (1) cartographic records, (2) remote sensing imagery

52

Hopper Updates and Status  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Updates and Status Current Status: Up Open Issues List of known problems, submitted bug reports and issues we are actively working on. Read More » Hopper Featured Announcements A list of key Hopper announcements and system changes. Read More » Hopper Email Announcements Archive An archive of email announcements sent to NERSC users regarding Hopper. Read More » Announcements Hopper OS upgrade and new SW set to default next Wed, Feb 27 21 February 2013, 10:29 am Hopper scheduled maintenance tomorrow (Sept 19) and /project outage 18 September 2012, 4:46 pm Please use "gres" settings in your batch scripts 4 September 2012, 2:03 pm high thruput queue now available on Hopper 30 August 2012, 4:27 pm max walltime for low queue is increased to 24 hrs on Hopper

53

CHALLENGES FOR THE SNS RING ENERGY UPGRADE  

SciTech Connect (OSTI)

The Oak Ridge Spallation Neutron Source accumulator ring presently operates at a beam power of about 1 MW with a beam energy of about 910 MeV. A power upgrade is planned to increase the beam energy to 1.3 GeV. For the accumulator ring this mostly involves modifications to the injection and extraction sections. A variety of modifications to the existing injection section were necessary to achieve 1 MW, and the tools developed and the lessons learned from this work are now being applied to the design of the new injection section. This paper will discuss the tools and the lessons learned, and also present the design and status of the upgrades to the accumulator ring.

Plum, Michael A [ORNL; Gorlov, Timofey V [ORNL; Holmes, Jeffrey A [ORNL; Hunter, W Ted [ORNL; Roseberry, Jr., R Tom [ORNL; Wang, Jian-Guang [ORNL

2012-01-01T23:59:59.000Z

54

Moral Status  

E-Print Network [OSTI]

Chapters One through Three present the following view: (i) I explain moral status as follows: something has moral status just in case we have reasons not to cause harms to it simply in virtue of the badness of the harms ...

Harman, Elizabeth, 1975-

2003-01-01T23:59:59.000Z

55

Bicycling Black Rings  

E-Print Network [OSTI]

We present detailed physics analyses of two different 4+1-dimensional asymptotically flat vacuum black hole solutions with spin in two independent planes: the doubly spinning black ring and the bicycling black ring system ("bi-rings"). The latter is a new solution describing two concentric orthogonal rotating black rings which we construct using the inverse scattering technique. We focus particularly on extremal zero-temperature limits of the solutions. We construct the phase diagram of currently known zero-temperature vacuum black hole solutions with a single event horizon, and discuss the non-uniqueness introduced by more exotic black hole configurations such as bi-rings and multi-ring saturns.

Henriette Elvang; Maria J. Rodriguez

2008-01-25T23:59:59.000Z

56

DOE Records Disposition Schedule Changes | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Records Disposition Schedule Changes DOE Records Disposition Schedule Changes Disposition Schedule Changes DOE Records Disposition Schedule Changes More Documents & Publications...

57

JGI - CSP Proposal Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Proposal Schedule Proposal Schedule CSP | Overview | How to Propose a Project | Review Process | DOE Relevance Proposal Schedule | FAQ Small-scale Microbial/Metagenome Proposals - reviewed twice yearly Small-scale proposals for specific types of microbial and metagenome projects are accepted on a continuous basis and will be reviewed twice a year. Letters of intent are not required. Deadline for submission is 60 days prior to the review date. Next review dates (submission deadline in parentheses): January 2014 (Nov 22, 2013) July 2014 (May 23, 2014) Submit small-scale microbial/metagenome proposals anytime using the Work Initiation Process (WIP) interface. Synthetic Biology proposals Synthetic biology proposals are accepted on a continuous basis and will be reviewed twice a year. Letters of intent are not required. Deadline for

58

SRS CAB - Meeting Schedules  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SRS CAB Meeting Schedule SRS CAB Meeting Schedule Savannah River Site - Citizens Advisory Board 2013 Schedule To join current Online Meetings or view archived Online Meetings click on the buttons in the right-hand column. CAB Full Board and Combined Committees Meetings are not presented in the Online Meeting format. Instructions for Accessing Committee Meetings Online To request a copy of an archived online meeting, scroll down to the date of the meeting you wish to request, and click on the green "Request Archived Online Meeting" button. Your email browser will open and generate a new email to srscitizensadvisoryboard@srs.gov with the committee meeting you wish to request in the subject line. Please, include your name and mailing address in the body of the email. Once we receive the email, we will send

59

NERSC Holiday Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NERSC NERSC Holiday Schedule NERSC Holiday Schedule December 20, 2013 by Francesca Verdier (0 Comments) All NERSC computing and storage systems will remain in full operation throughout the holiday season (Tuesday December 24 through Wednesday January 1). From Tuesday December 24 through Wednesday January 1, NERSC Consulting and Account Support services will be available *only* on Friday December 27 and Monday December 30, from 8:00 to 5:00 Pacific Time. Normal Consulting and Account Support schedules will resume on Thursday, January 2. As always, critical system problems may be reported at any time to NERSC Operations at 1-800-666-3772, menu option 1, or 1-510-486-6821. You should also contact Operations if you need to have your password reset (or login failures cleared) over the holidays.

60

ADMINISTRATIVE RECORDS SCHEDULE 20:  

Broader source: Energy.gov (indexed) [DOE]

20: 20: ELECTRONIC RECORDS April 2008 Revision 2 This schedule authorizes the disposition of specified electronic records and hard-copy or microform records and are integrally related to them. The electronic records may either be created or received. Included are records created by computer operators, programmers, analysts, systems administrators, and all personnel with access to a computer. Disposition authority is provided for certain master files, including some tables that are components of data base management systems, and certain files created from master files for specific purposes. In addition, this schedule covers certain disposable electronic records produced by end users in office automation applications. These disposition authorities apply to the

Note: This page contains sample records for the topic "ring status schedules" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

GENERAL RECORDS SCHEDULE 1  

Broader source: Energy.gov (indexed) [DOE]

39 39 DEPARTMENT OF ENERGY ADMIN1STRATIVE RECORDS SCHEDULE 1: PERSONNEL RECORDS June 2007 Revision 2 As do all Administrative Records Schedules (ADMs), ADM-1 covers records of the Department and its contractors. The records include, employee concerns programs, labor agreements and negotiations, labor relations, academic and outreach programs, apprenticeship programs, job vacancies, unemployment compensation, recruitment and employee health. The most important types of records are the Official Personnel Folders, the Service Record Cards, and the Employee Medical Folders. Those for Federal employees are maintained according to The Guide to Personnel Recordkeeping, an Office of Personnel Management directive that prescribes a system of recordkeeping for Federal

62

EGov PMA Scorecard Cost, Schedule & Performance Standard...  

Energy Savers [EERE]

EGov PMA Scorecard Cost, Schedule & Performance Standard.tif EGov PMA Scorecard Cost, Schedule & Performance Standard.tif EGov PMA Scorecard Cost, Schedule &...

63

Recent Progress at the Photon Factory Storage Ring  

SciTech Connect (OSTI)

The present status of the Photon Factory storage ring (PF ring) at High Energy Accelerator Research Organization (KEK), including recent progress for the machine developments, is reported. Due to the establishment of the simultaneous injection to the three rings (PF, HER, LER) from the KEK injector linac since April 2009, the PF ring currently operates almost all the time in a top-up mode available to users at a stored current of 450 mA in multi-bunch mode, and at a stored current of 51 mA in single-bunch mode, except the time while the KEK linac injection to the PF-AR twice daily. The third in-vacuum short gap undulator was installed at PF ring in September 2009.

Miyauchi, Hiroshi [Photon Factory, High Energy Accelerator Research Organization, KEK, Oho, Tsukuba, Ibaraki 305-0801 (Japan)

2010-06-23T23:59:59.000Z

64

Factors affecting piston ring friction  

E-Print Network [OSTI]

The piston ring pack friction is a major contributor to the internal combustion engine mechanical friction loss. The oil control ring decides the oil supply to the top two rings in addition to being the major friction ...

Liao, Kai, Ph. D. Massachusetts Institute of Technology

2013-01-01T23:59:59.000Z

65

Project Scheduling (3) Corequisite  

E-Print Network [OSTI]

) CMGT 111 Construction Materials & Methods Lab (1) CMGT 460 Project Cost Controls (3) FA SP CMGT 320 FASYMBOLS CMGT 417 Project Scheduling (3) Corequisite Offered FALL Only CMGT 240 Intro) CMGT 475 Construction Project Management (3) MATH 108 College Algebra (4) Construction Elective

Barrash, Warren

66

Project Scheduling (3) Corequisite  

E-Print Network [OSTI]

460 Project Cost Controls (3) FA SP FA CE 210/211 Surveying & Lab (3) CMGT 410 Concrete FormworkSYMBOLS CMGT 417 Project Scheduling (3) Corequisite Offered FALL Only CMGT 240 Intro Construction Project Management (3) MATH 108 College Algebra (4) MGMT 301 Leadership Skills (3) ENGL 101

Barrash, Warren

67

TOWARDS UNIFYING DATABASE SCHEDULING AND  

E-Print Network [OSTI]

1 TOWARDS UNIFYING DATABASE SCHEDULING AND CONCURRENCY CONTROL: A FRONTIER APPROACH Gregory Jones previous work in real-time database concurrency control indexconcur- rency control and scheduling has focused on combiningvariations of traditional concurrency control techniques with real-time scheduling

Rhode Island, University of

68

Optimal Power Schedule for Distributed MIMO Links  

E-Print Network [OSTI]

an integration of link scheduling and power control for MIMOmedium access control, space-time power scheduling. Fig. 1.

Rong, Yue; Hua, Yingbo

2008-01-01T23:59:59.000Z

69

ADMINISTRATIVE RECORDS SCHEDULE 14: INFORMATIONAL SERVICES RECORDS...  

Broader source: Energy.gov (indexed) [DOE]

4: INFORMATIONAL SERVICES RECORDS ADMINISTRATIVE RECORDS SCHEDULE 14: INFORMATIONAL SERVICES RECORDS This schedule covers certain records pertaining to informational services...

70

APS Long Range Operations Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Shutdown Planning Shutdown Planning Planning Templates Shutdown Planning Schedules: Current Shutdown Schedule Archives: 2006 - 2013 APS Long-Range Operations Schedule: 2014 Archives: 2013 | 2012 2011 | 2010 | 2009 | 2008 2007 | 2006 | 2005 | 2004 2003 | 2002 | 2001 | 2000 1999 | 1998 | 1997 | 1996 APS Long-Range Operations Schedule (Fiscal Year 2014) Alternate Formats: iCal | Excel | PDF APS Long-Range Operation Schedule 2013-3 2014-1 2014-2 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2

71

Department of Energy refurbish power supply/distribution system: Phase 2, Y-12 Plant, Oak Ridge. Project status report No. 40, December 1--31, 1994  

SciTech Connect (OSTI)

A status report on the refurbishing of the power supply and distribution system for the Y-12 Plant is presented. A milestone schedule is included.

NONE

1994-12-31T23:59:59.000Z

72

Study of ring and ring-disk electrodes  

SciTech Connect (OSTI)

Rotating ring and ring-disk electrodes were modeled. The primary, secondary, and below-the-limiting current distributions for ring electrodes were computed. The ring-disk system was modeled for secondary and below-the-limiting current distributions. Mass transfer measurements in laminar, transition, and turbulent flows were made for thin rotating rings. The effect of cell walls on the potential distribution of disk electrodes was computed.

Pierini, P.E.

1981-05-01T23:59:59.000Z

73

ADMINISTRATIVE RECORDS SCHEDULE 14:  

Broader source: Energy.gov (indexed) [DOE]

5 5 ADMINISTRATIVE RECORDS SCHEDULE 14: INFORMATIONAL SERVICES RECORDS June 2007 Revision 1 This schedule covers certain records pertaining to informational services performed by the Department in their day-to-day affairs and in their relations with the public, including records created in administering Freedom of Information Act (FOIA) and Privacy Act ) programs. Except as otherwise specified in individual items, it applies to copies of these records wherever located. Item 4 applies only to files maintained in office responsible for the operation of the information activities. Items 11 through 15 describe the files accumulated in carrying out the provisions of the FOIA, and items 21 through 26 describe the files created in administering the provisions of the Privacy Act. Items 31

74

Transportation Baseline Schedule  

SciTech Connect (OSTI)

The 1999 National Transportation Program - Transportation Baseline Report presents data that form a baseline to enable analysis and planning for future Department of Energy (DOE) Environmental Management (EM) waste/material transportation. The companion 1999 Transportation Barriers Analysis analyzes the data and identifies existing and potential problems that may prevent or delay transportation activities based on the data presented. The 1999 Transportation Baseline Schedule (this report) uses the same data to provide an overview of the transportation activities of DOE EM waste/materials. This report can be used to identify areas where stakeholder interface is needed, and to communicate to stakeholders the quantity/schedule of shipments going through their area. Potential bottlenecks in the transportation system can be identified; the number of packages needed, and the capacity needed at receiving facilities can be planned. This report offers a visualization of baseline DOE EM transportation activities for the 11 major sites and the Geologic Repository Disposal site (GRD).

Fawcett, Ricky Lee; John, Mark Earl

2000-01-01T23:59:59.000Z

75

BNL | ATF Beam Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Beam Schedule (pdf) Beam Schedule (pdf) Sunday Monday Tuesday Wednesday Thursday Friday Saturday 22 1/2 Holiday Holiday 28 January Holiday 4 5 Maintenance 11 12 Maintenance 18 19 Holiday AE52 - DWFA (Euclid), BL2 25 February AE52 - DWFA (Euclid), BL2 1 2 AE50 - PWFA in QNR (UCLA), BL2 8 9 AE50 - PWFA in QNR (UCLA), BL2 15 16 Holiday AE50 - PWFA in QNR (UCLA), BL2 22 March 1 2 AE53 - Nonlinear Compton (UCLA) 8 9 AE53 - Nonlinear Compton (UCLA) 15 16 AE53 - Nonlinear Compton (UCLA) 22 23 29 Sunday Monday Tuesday Wednesday Thursday Friday Saturday User operations (E-beam in use) Ions - Ion generation User operations (laser in use) PWFA - Plasma Wakefield Acceleration User operations (E-beam and laser in use)

76

1993 Wholesale Power and Transmission Rate Schedules.  

SciTech Connect (OSTI)

Bonneville Power Administration 1993 Wholesale Power Rate Schedules and General Rate Schedule Provisions and 1993 Transmission Rate Schedules and General Transmission Rate Schedule Provisions, contained herein, were approved on an interim basis effective October 1, 1993. These rate schedules and provisions were approved by the Federal Energy Commission, United States Department of Energy, in September, 1993. These rate schedules and provisions supersede the Administration`s Wholesale Power Rate Schedules and General Rate Schedule Provisions and Transmission Rate Schedules and General Transmission Rate Schedule Provisions effective October 1, 1991.

US Bonneville Power Administration

1993-10-01T23:59:59.000Z

77

SMARTS status  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SMARTS INSTRUMENT STATUS SMARTS INSTRUMENT STATUS Instrument Status (Last updated: 2014/01/11 12:06:58) Run Number: 87401 Title: Sample1 Pretested [4.06,150.00,-0.75,45.00] Run Status: running Last Script Activity: 2014/01/11 11:52:36: Start run 87401; mah 1200000 move 4.06 150.00 -0.75 45.00 View full script Next Script Command: mah 1200000 move -0.75 120.00 -0.60 45.00 Proposal#: 4808 Sample#: 977 MAH: 837309 Monitor: 306052 Beam Current: 100 Shutter Status: OPEN Used disk space on /home: 52% Used disk space on /disk2: 74% Crate Status smartsdaq1 smartsdaq2 smartsdaq3 smartsdaq4 smartsdaq5 T0's in Run 16946 16959 16971 16984 16997 T0's Processed 16946 16959 16971 16984 16997 Events 726326 649097 794699 702610 3750460 Events/T0 42.86 38.27 46.83 41.37 220.65

78

2007 Wholesale Power Rate Schedules : 2007 General Rate Schedule Provisions.  

SciTech Connect (OSTI)

This schedule is available for the contract purchase of Firm Power to be used within the Pacific Northwest (PNW). Priority Firm (PF) Power may be purchased by public bodies, cooperatives, and Federal agencies for resale to ultimate consumers, for direct consumption, and for Construction, Test and Start-Up, and Station Service. Rates in this schedule are in effect beginning October 1, 2006, and apply to purchases under requirements Firm Power sales contracts for a three-year period. The Slice Product is only available for public bodies and cooperatives who have signed Slice contracts for the FY 2002-2011 period. Utilities participating in the Residential Exchange Program (REP) under Section 5(c) of the Northwest Power Act may purchase Priority Firm Power pursuant to the Residential Exchange Program. Rates under contracts that contain charges that escalate based on BPA's Priority Firm Power rates shall be based on the three-year rates listed in this rate schedule in addition to applicable transmission charges. This rate schedule supersedes the PF-02 rate schedule, which went into effect October 1, 2001. Sales under the PF-07 rate schedule are subject to BPA's 2007 General Rate Schedule Provisions (2007 GRSPs). Products available under this rate schedule are defined in the 2007 GRSPs. For sales under this rate schedule, bills shall be rendered and payments due pursuant to BPA's 2007 GRSPs and billing process.

United States. Bonneville Power Administration.

2006-11-01T23:59:59.000Z

79

Rate Schedules | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Rate Schedules Rate Schedules Rate Schedules One of the major responsibilities of Southeastern is to design, formulate, and justify rate schedules. Repayment studies prepared by the agency determine revenue requirements and appropriate rate levels and these studies for each of Southeastern's four power marketing systems are updated annually. They demonstrate the adequacy of the rates for each system. Rates are considered to be adequate when revenues are sufficient to repay all costs associated with power production and transmission costs, which include the amortization of the Federal investment allocated to power. Latest Rate Schedules October 1, 2012 ALA-1-N Wholesale Power Rate Schedule Area: PowerSouth Energy Cooperative System: Georgia-Alabama-South Carolina October 1, 2012

80

Chemotherapy Operations Planning and Scheduling  

E-Print Network [OSTI]

Feb 12, 2010 ... ning and scheduling methods for chemotherapy patients with the ... growth, control or prevent the spread of cancer cells, and/or relieve cancer...

2010-02-13T23:59:59.000Z

Note: This page contains sample records for the topic "ring status schedules" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Construction Schedule | Advanced Photon Source  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Construction Schedule Current Projects 27-ID and 35-ID APS Vibration Reporting Protocol Summary of Construction Equipment Tests and Activities Jan 2014 Past Projects APCF LOM438...

82

Archives and History Office: Records Schedules  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Services > Records Schedules Services > Records Schedules Records Schedules Note: Some links on this page open pdf files, which require the free Acrobat Reader. SLAC Current Organizational Unit File Plans / Records Control Schedules For assistance in applying or developing a records schedule for your unit, please contact either the SLAC Archives and History Office (x3091 -- directorate and research records) or the SLAC Records Manager (x4342 -- business and safety records). Directorate Organizational Unit Applicable File Plans(s) / Records Control Schedule(s) Director's Office SLAC DO Schedule Advisor for Science and Technology DOE Administrative Records schedules and DOE R&D Schedule Chief Research Officer DOE Administrative Records schedules and DOE R&D Schedule Communications Office DOE Administrative Records schedules (particularly ADM14 and ADM21)

83

Localisation in Enveloping Rings  

Science Journals Connector (OSTI)

......right ideal E of R, 3 an n such that (1) If R is commutative this condition becomes, 3n such that (2) where K(I) = (x\\xcel for some ce#). We say that an ideal / of a ring R has the AR property if, for any right ideal E of R, 3n such that E n......

J. C. McConnell

1968-01-01T23:59:59.000Z

84

Green Scheduling: Scheduling of Control Systems for Peak Power Reduction  

E-Print Network [OSTI]

approach to fine-grained coordination of energy demand by scheduling energy consuming control systems of the system variables only, control system execution (i.e. when energy is supplied to the system-Scheduling; Energy Systems; Peak Power Reduction; Load Balancing; I. INTRODUCTION During a major sporting event

Pappas, George J.

85

Automation Status  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NREL Manufacturing R&D Workshop NREL Manufacturing R&D Workshop NREL H2/FC Manufacturing R&D Workshop Automation Status Garry Sperrick garry@sperkllc.com 585-259-0311 August 11, 2011 Automation Status NREL Manufacturing R&D Workshop Presentation Overview ƒ Brief Introduction ƒ DOE / NREL - Review & Discussion ƒ Automation Platforms ƒ Automation Processes ƒ Automation Considerations of the Manufacturer ƒ Manufacturer and the Supplier ƒ Three (3) Automation Programs Following these Guidelines ƒ Automotive Component Manufacturing ƒ Medical Manufacturing ƒ Membrane Electrode Assembly Manufacturing ƒ Hypothetical Fuel Cell Manufacturing Platforms August 11, 2011 Automation Status NREL Manufacturing R&D Workshop Professional Bio ƒ Automation Technician - Mobil Chemical

86

DOERS Records Schedule Cross Index to DOE Administrative Records...  

Office of Environmental Management (EM)

DOERS Records Schedule Cross Index to DOE Administrative Records Disposition Schedules DOERS Records Schedule Cross Index to DOE Administrative Records Disposition Schedules...

87

Status and Future of TRANSCOM  

Broader source: Energy.gov (indexed) [DOE]

Steve Casey Steve Casey U.S. Dept. of Energy Carlsbad Field Office  Current Program status g  Upcoming Changes  Glimpse at future options  DOE Commitments 2 6/3/2010 2  Current Program status g * Computer Based Training * User Support Site * Program Support * Program Accomplishments U i Ch  Upcoming Changes  Glimpse at future options  DOE Commitments 3  1 st release - December 2009 9  Covers general user training  Allows organizations access to training without waiting for a traditional class  Computer security module to be added Autumn 2010 Autumn 2010  Shipper/Scheduler training - being considered 4 6/3/2010 3  Completely overhauled in p y 2009  Features are user friendly  Layout more intuitive

88

The Load Distribution Problem in a Ring of Processors Francis C.M. Lau \\Lambda  

E-Print Network [OSTI]

into the following phases: load measurement, calculation of load average, generation of load distribution scheduleThe Load Distribution Problem in a Ring of Processors Francis C.M. Lau \\Lambda Department of Computer Science The University of Hong Kong March 1998 Abstract Given a global picture of the system load

Lau, Francis C.M.

89

_PART I - THE SCHEDULE  

National Nuclear Security Administration (NNSA)

15 dated 9/9/13 Contract No. DE-AC04-94AL85000 15 dated 9/9/13 Contract No. DE-AC04-94AL85000 Modification No. M202 Part I - The Schedule Sections B through H TABLE OF CONTENTS B-1 SERVICES BEING ACQUIRED ...................................................................................... 4 B-2 CONTRACT TYPE AND VALUE (Rev. M218, M222, M236, M241, M261, M266, M288, M293, M312, M319, M344, M365, M400, M404, M443, M448, M473, M484, M0512, A0514) ............................................................................................................................ 4 B-3 AVAILABILITY OF APPROPRIATED FUNDS ................................................................. 8 B-9999 AMERICAN RECOVERY AND REINVESTMENT ACT WORK VALUES (Added M331; Modified: A335, A336, A340, A341, A342, A346, A347, A348, A349, A350,

90

Structure Breakdown Workshop Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Breakdown Breakdown Workshop SLAC, Orange Room August 28 - 30 , 2000 Announcement Workshop Poster Workshop Goals: The Goal of the workshop is to review understanding of warm structure breakdown phenomena, to define common terms for comparing tests and to identify avenues for further study. For a partial bibliography, please view the following URL : http://www-project.slac.stanford.edu/lc/wkshp/RFBreakdwn/references/publist.htm Schedule and Presentations: Monday, August 28 8:30 - Operation Experience and Definition of Problem Moderator - G. Loew (initial questions) Opening remarks and introduction (C. Adolphsen) (15min) CERN Structure Operation Results (W. Wuensch) (30 min) NLCTA Structure Operation Results (C. Adolphsen) (30 min) ASTA Structure Operation Results (R. Loewen) (20 min)

91

Speaker Host Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

User Science Seminar User Science Seminar Previous Speakers User Science Seminar Host Schedule User seminar is hosted by a different XSD group leader every two weeks. If you have any suggestions for possible speakers for the following dates, please contact the appropiate group leader below. Month Host 2012 October 5 & 12, 2012 Peter Chupas October 19 & 26,2012 Jon Almer November 2 & 9,2012 Francesco Decarlo November 16, 2012 Stefan Vogt November 23, 2012 Cancelled - Thanksgiving Holiday December 7, 2012 Stefan Vogt December 14 & 21, 2012 Randy Winans December 28, 2012 Cancelled - Xmas Holiday 2013 Janurary 4-25, 2013 Cancelled - January Shutdown February 1 & 8 , 2013 Lahsen Assoufid February 15 & 22, 2013 Thomas Gog March 1 & 8, 2013 Jonathan Lang

92

schedule_2006.xls  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6 Long Range Operations Schedule 6 Long Range Operations Schedule (October 2005 - September 2006) 1 1 1 1 → 1 1 1 4 → 1 1 1 1 1 1 2 2 4 → 2 1 → 2 2 2 4 2 2 2 2 2 1 → 2 3 3 4 3 1 → 3 3 3 4 3 3 3 3 3 1 → 3 4 4 4 4 1 → 4 4 4 4 4 4 4 4 4 1 → 4 5 5 4 5 1 → 5 5 5 4 5 5 5 5 5 1 → 5 6 6 4 6 1 6 6 6 4 6 6 6 6 6 1 → 6 7 7 4 7 1 → 7 7 7 4 7 7 7 7 7 1 → 7 8 8 4 8 1 → 8 8 8 4 → 8 8 8 8 8 1 8 9 9 9 1 → 9 9 9 4 9 9 9 9 9 1 → 9 10 10 10 1 → 10 10 10 4 10 10 10 10 10 1 → 10 11 11 11 1 → 11 11 11 4 11 11 11 11 11 1 → 11 12 12 12 1 → 12 12 12 4 12 1 → 12 12 12 4 → 12 1 → 12 13 13 13 1 13 13 13 4 13 1 → 13 13 13 4 13 1 → 13 14 14 14 5 → 14 14 14 14 1 → 14 14 14 4 14 1 → 14 15 15 15 5 15 15 15 15 1 → 15 15 15 4 15 1 15 16 16 16 5 16 16 16 16 1

93

Wholesale Power Rate Schedules | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Services » Rate Schedules » Wholesale Power Rate Schedules Services » Rate Schedules » Wholesale Power Rate Schedules Wholesale Power Rate Schedules October 1, 2012 ALA-1-N Wholesale Power Rate Schedule Area: PowerSouth Energy Cooperative System: Georgia-Alabama-South Carolina October 1, 2012 Duke-1-E Wholesale Power Rate Schedule Area: Duke On-System System: Georgia-Alabama-South Carolina October 1, 2012 Duke-2-E Wholesale Power Rate Schedule Area: Central System: Georgia-Alabama-South Carolina October 1, 2012 Duke-3-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina October 1, 2012 Duke-4-E Wholesale Power Rate Schedule Area: Duke Self-Schedulers System: Georgia-Alabama-South Carolina October 1, 2012 MISS-1-N Wholesale Power Rate Schedule Area: South Mississippi Electric Power Association

94

Wholesale Power Rate Schedules | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Services » Rate Schedules » Wholesale Power Rate Schedules Services » Rate Schedules » Wholesale Power Rate Schedules Wholesale Power Rate Schedules October 1, 2012 ALA-1-N Wholesale Power Rate Schedule Area: PowerSouth Energy Cooperative System: Georgia-Alabama-South Carolina October 1, 2012 Duke-1-E Wholesale Power Rate Schedule Area: Duke On-System System: Georgia-Alabama-South Carolina October 1, 2012 Duke-2-E Wholesale Power Rate Schedule Area: Central System: Georgia-Alabama-South Carolina October 1, 2012 Duke-3-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina October 1, 2012 Duke-4-E Wholesale Power Rate Schedule Area: Duke Self-Schedulers System: Georgia-Alabama-South Carolina October 1, 2012 MISS-1-N Wholesale Power Rate Schedule Area: South Mississippi Electric Power Association

95

Scheduling algorithms for arbitrary communication networks  

E-Print Network [OSTI]

We consider the problem of designing scheduling schemes for networks with arbitrary topology and scheduling constraints. We address the optimality of scheduling schemes for packet networks in terms of throughput, delay and ...

Jagabathula, Srikanth

2008-01-01T23:59:59.000Z

96

Accelerated ring laser  

Science Journals Connector (OSTI)

The behavior of a ring laser rotating with nonuniform angular velocity has become of interest, both experimental and theoretical. Within a framework of modest idealizations, we present a classical, relativistically exact theoretical analysis. The beat frequency, we find, is given by an expression of the Sagnac form but with the instantaneous angular velocity in place of the usual constant velocity. One has an "instantaneous Sagnac effect."

Takamasa Takahashi and Ralph Baierlein

1977-02-01T23:59:59.000Z

97

SNS Operating Status | ORNL Neutron Sciences  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SNS Operating Status Alerts SNS Operating Status Alerts Receive updates about the SNS beam status via text messages to your cell phone and/or e-mail by signing up here. The instrument hall coordinators will communicate any significant beam status changes including beam start, beam down, planned and unplanned outages, and unanticipated schedule changes such as delays. On the registration, enter your e-mail address to receive e-mail updates or to receive text messages enter the information below that is specific to your cell phone provider: Carrier Email to SMS Gateway Alltel [10-digit phone number]@message.alltel.com Example:1234567890@message.alltel.com AT&T (formerly Cingular) [10-digit phone number]@txt.att.net [10-digit phone number]@mms.att.net (MMS) [10-digit phone number]@cingularme.com

98

Precooler Ring Vacuum System  

SciTech Connect (OSTI)

The precooler vacuum system, as proposed by FNAL, is based on a suitable modification of the existing Electron Cooling Ring System. Because of the magnetic cycle of the bending magnets, distributed ion pumping, as exists in the Electron Cooling Ring, is not applicable. Instead, the proposed pumping will be done with commercial appendage ion pumps mounted approximately every two meters around the circumference of the ring. The loss of effective pumping speed and non-uniformity of system pressure with appendage pumps may not be major considerations but the large number required does effect experimental and analytical equipment placement considerations. There is a distributed pumping technique available which: (1) is not affected by the magnetic cycle of the bending magnets; (2) will provide a minimum of four times the hydrogen pumping speed of the proposed appendage ion pumps; (3) will require no power during pumping after the strip is activated; (4) will provide the heat source for bakeout; (5) is easily replaceable; and (6) can be purchased, installed, and operated at a generous economic advantage over the presently proposed ion pumped system. The pumping technique referred to is non-evaporable gettering with ST101 Zr/Al pumping strip. A technical description of this pumping strip is given on Data Sheet 1 and 2 attached to this report.

Moenich, J.

1980-10-02T23:59:59.000Z

99

ADMINISTRATIVE RECORDS SCHEDULE 9: TRAVEL AND TRANSPORTATION...  

Broader source: Energy.gov (indexed) [DOE]

9: TRAVEL AND TRANSPORTATION RECORDS ADMINISTRATIVE RECORDS SCHEDULE 9: TRAVEL AND TRANSPORTATION RECORDS This schedule covers records documenting the movement of goods and persons...

100

ADMINISTRATIVE RECORDS SCHEDULE 9: TRAVEL AND TRANSPORTATION...  

Energy Savers [EERE]

9: TRAVEL AND TRANSPORTATION RECORDS (Revision 2) ADMINISTRATIVE RECORDS SCHEDULE 9: TRAVEL AND TRANSPORTATION RECORDS (Revision 2) This schedule covers records documenting the...

Note: This page contains sample records for the topic "ring status schedules" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

INSTRUCTIONS for COMPLETING SCHEDULE CARD WEB FORMS  

E-Print Network [OSTI]

Mar 22, 2012 ... Instructions for completing schedule card web forms. The following students are required to complete schedule card web forms. all returning...

Kelly Beranger

2012-03-22T23:59:59.000Z

102

ADMINISTRATIVE RECORDS SCHEDULE 20: ELECTRONIC RECORDS | Department...  

Office of Environmental Management (EM)

20: ELECTRONIC RECORDS ADMINISTRATIVE RECORDS SCHEDULE 20: ELECTRONIC RECORDS This schedule authorizes the disposition of specified electronic records and hard-copy or microform...

103

ADMINISTRATIVE RECORDS SCHEDULE 21: AUDIOVISUAL RECORDS | Department...  

Broader source: Energy.gov (indexed) [DOE]

AUDIOVISUAL RECORDS ADMINISTRATIVE RECORDS SCHEDULE 21: AUDIOVISUAL RECORDS This schedule covers audiovisual and related records created by or for Department and those acquired in...

104

ADMINISTRATIVE RECORDS SCHEDULE 21:AUDIOVISUAL RECORDS (Revision...  

Broader source: Energy.gov (indexed) [DOE]

AUDIOVISUAL RECORDS (Revision 1) ADMINISTRATIVE RECORDS SCHEDULE 21:AUDIOVISUAL RECORDS (Revision 1) This schedule covers audiovisual and related records created by or for...

105

ADMINISTRATIVE RECORDS SCHEDULE 20: ELECTRONIC RECORDS | Department...  

Office of Environmental Management (EM)

0: ELECTRONIC RECORDS ADMINISTRATIVE RECORDS SCHEDULE 20: ELECTRONIC RECORDS This schedule authorizes the disposition of specified electronic records and hard-copy or microform...

106

Patrick Ring | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Patrick Ring Patrick Ring About Us Patrick Ring - Team Leader, Benefits Continuity Team Patrick Ring is the team leader for the continuity of contractor pension and postretirement benefit programs for contractor workers formerly employed at DOE closure sites. Mr. Ring has more than 31 years of federal service between the U.S. Department of Energy (DOE), U.S. Department of Defense, and the Pension Benefit Guaranty Corporation. His experience has provided him extensive knowledge and experience in dealing with contractor retirement benefit programs. Mr. Ring joined the Office of Legacy Management (LM) in October 2005 as a contractor industrial relations specialist/actuary and a member of the Benefits Continuity Team. Prior to joining LM, Mr. Ring was employed as an actuary with the Defense

107

Current Status  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Current Status Current Status > Content on this page requires a newer version of Adobe Flash Player. Get Adobe Flash player July 31, 1942 The Army Corp of Engineers leases 1,025 acres of the Cook County Forest Preserve to build a research facility. November 1942 Under the direction of Enrico Fermi, a group of scientists at the University of Chicago begin building Chicago Pile-1 (CP-1). Security and secracy were essential. December 2, 1942 Enrico Fermi's team creates the world's first self-sustaining nuclear chain reaction using the CP-1 reactor under Stagg Field at the University of Chicago. CP-1 1943 The experiments under Stagg Field shut down, and the scientists move to a 19 acre section of the leased forest preserve, known as Site A. CP-1 is reconstructed and modified at Site A and renamed Chicago Pile 2 (CP-2).

108

LCLS Operating Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

LCLS Operating Schedule LCLS Operating Schedule August - December 2009 Ver: 2 10/30/09 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 S Su M T W Th F S Su M T W Th F S Su M T W Th F S Su M T W Th F S Su M 0000-0800 MD MD MD MD MD 0800-1600 ROD MD AMO ROD MD AMO 1600-2400 MD MD Commissioning MD MD Comm. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 T W Th F S Su M T W Th F S Su M T W Th F S Su M T W Th F S Su M T W 0000-0800 MD MD MD MD MD MD MD MD MD 0800-1600 MD ROD AMO MD ROD AMO MD ROD AMO MD ROD AMO ROD 1600-2400 MD MD Commissioning MD MD Commissioning MD MD Commissioning MD MD Commissioning MD 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Th F S Su M T W Th F S Su M T W Th F S Su M T W Th F S Su M T W Th F S 0000-0800 MD MD MD MD MD MD MD MD MD 0800-1600 Young MD ROD DiMauro MD ROD Berrah MD ROD Coffee MD ROD Young-II 1600-2400 L018 MD MD L026 MD MD L015 MD MD L027 MD MD L017 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Su

109

Wholesale Power Rate Schedules | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Schedules Schedules Wholesale Power Rate Schedules October 1, 2011 CBR-1-H Wholesale Power Rate Schedule Area: Big Rivers and Henderson, KY System: CU October 1, 2011 CSI-1-H Wholesale Power Rate Schedule Area: Southern Illinois System: CU October 1, 2011 CK-1-H Wholesale Power Rate Schedule Area: KU Area System: CU October 1, 2011 CEK-1-H Wholesale Power Rate Schedule Area: East Kentucky System: CU October 1, 2011 CC-1-I Wholesale Power Rate Schedule Area: CP&L Area, Western Division System: CU September 20, 2011 JW-1-J Wholesale Power Rate Schedule Area: Woodruff Preference Customer System: Jim Woodruff September 20, 2011 JW-2-F Wholesale Power Rate Schedule Area: Florida Power Corporation System: Jim Woodruff November 17, 2010 AP-1-B Wholesale Power Rate Schedule Area: American Electric Power

110

Ring Ring. Who's There? A Wind Expert | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Ring Ring. Who's There? A Wind Expert Ring Ring. Who's There? A Wind Expert Ring Ring. Who's There? A Wind Expert August 23, 2010 - 10:44am Addthis Stephen Graff Former Writer & editor for Energy Empowers, EERE Have a question about wind energy? You're not alone. In 2009, about 1,200 people- ranging from farmers, teachers, county commissioners, developers and green job hopefuls -called or emailed Minnesota-based Windustry's wind hotline to learn more about the renewable energy. "The questions are all over the map," said David Tidball, who has been fielding calls since early 2009. "It's everything from, 'What's a wind turbine look like?' to 'How do I get involved in a wind project of my own?'" Windustry's mission is to provide accurate, unbiased and accessible information to the public about wind energy and help people across the

111

EIA Records Schedule 0011.doc  

Broader source: Energy.gov (indexed) [DOE]

RECORD SCHEDULE N1-434-94-001 RECORD SCHEDULE N1-434-94-001 EIA Records Schedule N1-434-94-001 Approved by NARA April 3, 1995 (Some surveys are no longer in use. Read notes at bottom of last page) ITEM NO. DESCRIPTION OF RECORDS AUTHORIZED DISPOSITION Item 1) COAL DISTRIBUTION DATA, 1980-1988. This file contains data on the distribution of U.S. coal by coal-producing district of origin, consumer end-use category, state of destination and method of transportation; also included is export shipment information. This is a closed series. Disposition: PERMANENT. Transfer a copy of the data files and documentation to the National Archives upon approval of this schedule by the Archivist of the United States Item 2) HISTORICAL PLANT COST AND ANNUAL PRODUCTION EXPENSE DATA, 1979-1991.

112

On parallel machine scheduling 1  

E-Print Network [OSTI]

On parallel machine scheduling 1 machines with setup times. The setup has to be performed by a single server. The objective is to minimize even for the case of two identical parallel machines. This paper presents a pseudopolynomial

Magdeburg, Universität

113

Task merging for better scheduling  

Science Journals Connector (OSTI)

This paper proposes a new algorithm to restructure task graphs for suitable scheduling. The algorithm reduces communication costs by merging those tasks within a task graph whose communication costs exceeds their execution time. Task duplication techniques ...

Saeed Parsa; Neda Reza Soltani; Saeed Shariati

2009-08-01T23:59:59.000Z

114

Delay tails in MapReduce scheduling  

Science Journals Connector (OSTI)

MapReduce/Hadoop production clusters exhibit heavy-tailed characteristics for job processing times. These phenomena are resultant of the workload features and the adopted scheduling algorithms. Analytically understanding the delays under different schedulers ... Keywords: MapReduce, coupling scheduler, fair scheduler, first in first out, hadoop, heavy-tails, processor sharing

Jian Tan; Xiaoqiao Meng; Li Zhang

2012-06-01T23:59:59.000Z

115

Provably Efficient Two-Level Adaptive Scheduling  

E-Print Network [OSTI]

processor reallocation, our schedulers provide control over the scheduling overhead and ensure effectiveProvably Efficient Two-Level Adaptive Scheduling Yuxiong He1 , Wen-Jing Hsu1 , and Charles E. Multiprocessor scheduling in a shared multiprogramming en- vironment can be structured in two levels, where

Feitelson, Dror

116

Wireless Link Scheduling under Physical Interference Model  

E-Print Network [OSTI]

approximation algorithms for link scheduling with or without power control. Index Terms--Link schedulingWireless Link Scheduling under Physical Interference Model Peng-Jun Wan, Ophir Frieder, Xiaohua Jia: jia@cs.cityu.edu.hk, csfyao@cityu.edu.hk Abstract--Link scheduling is a fundamental problem in multi

Jia, Xiaohua

117

Energies of strained silica rings  

Science Journals Connector (OSTI)

The energies of strained two-member and three-member rings of SiO4 tetrahedra are calculated using models based on continuous SiO2 networks. These rings are considered to form highly reactive ``defect'' centers in vitreous SiO2 and at its surface. The calculations are based on a generalized gradient approximation to density-functional theory, and give strain energies of 1.23 and 0.25 eV for two- and three-member rings, considerably smaller than those previously estimated from Hartree-Fock calculations applied to small hydrogen-terminated molecular models. Structural results are compared with experiment for solids and molecules containing such rings. Changes in bond charge densities due to ring strain are illustrated, and modifications of the electronic states of relaxed SiO2 networks caused by strained ring defects are discussed.

D. R. Hamann

1997-06-01T23:59:59.000Z

118

Tevatron status  

SciTech Connect (OSTI)

The Fermilab Tevatron is both the world's highest energy accelerator system and first large-scale superconducting synchrotron. Since Tevatron commissioning in July 1983, the accelerator has operated in 1984, 1985 and 1987 with extracted beams of 800 GeV for three runs of fixed target physics, and in 1987, and 1988, with proton-antiproton colliding beams at 900 /times/ 900 GeV. This paper will focus on the collider operation of the Tevatron: its present status and the outlook for its longer-term future evolution. 18 refs., 3 figs., 2 tabs.

Dugan, G.

1989-03-01T23:59:59.000Z

119

Viscosity of Ring Polymer Melts  

Science Journals Connector (OSTI)

Viscosity of Ring Polymer Melts ... The ratio of the zero-shear viscosities of linear polymer melts ?0,linear to their ring counterparts ?0,ring at isofrictional conditions is discussed as a function of the number of entanglements Z. ... For this reason we have determined the viscosities by fitting the complex viscosity curves with different methods to obtain reliable estimates and error bars (see Supporting Information). ...

Rossana Pasquino; Thodoris C. Vasilakopoulos; Youn Cheol Jeong; Hyojoon Lee; Simon Rogers; George Sakellariou; Jrgen Allgaier; Atsushi Takano; Ana R. Brs; Taihyun Chang; Sebastian Gooen; Wim Pyckhout-Hintzen; Andreas Wischnewski; Nikos Hadjichristidis; Dieter Richter; Michael Rubinstein; Dimitris Vlassopoulos

2013-09-17T23:59:59.000Z

120

Bringing the User Back into Scheduling: Two Case Studies of Interaction with Intelligent Scheduling Assistants  

E-Print Network [OSTI]

of scheduling, or they demand too much control of an important aspect of the individual's working world. PTIMEBringing the User Back into Scheduling: Two Case Studies of Interaction with Intelligent Scheduling This position paper discusses the scheduling problem as collaboration between human and automated scheduling

Yorke-Smith, Neil

Note: This page contains sample records for the topic "ring status schedules" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Ground Movement in SSRL Ring  

SciTech Connect (OSTI)

Users of the Stanford Synchrotron Radiation Lightsource (SSRL) are being affected by diurnal motion of the synchrotron's storage ring, which undergoes structural changes due to outdoor temperature fluctuations. In order to minimize the effects of diurnal temperature fluctuations, especially on the vertical motion of the ring floor, scientists at SSRL tried three approaches: painting the storage ring white, covering the asphalt in the middle of the ring with highly reflective Mylar and installing Mylar on a portion of the ring roof and walls. Vertical motion in the storage ring is measured by a Hydrostatic Leveling System (HLS), which calculates the relative height of water in a pipe that extends around the ring. The 24-hr amplitude of the floor motion was determined using spectral analysis of HLS data, and the ratio of this amplitude before and after each experiment was used to quantitatively determine the efficacy of each approach. The results of this analysis showed that the Mylar did not have any significant effect on floor motion, although the whitewash project did yield a reduction in overall HLS variation of 15 percent. However, further analysis showed that the reduction can largely be attributed to a few local changes rather than an overall reduction in floor motion around the ring. Future work will consist of identifying and selectively insulating these local regions in order to find the driving force behind diurnal floor motion in the storage ring.

Sunikumar, Nikita; /UCLA /SLAC

2011-08-25T23:59:59.000Z

122

Split ring containment attachment device  

DOE Patents [OSTI]

A containment attachment device 10 for operatively connecting a glovebag 200 to plastic sheeting 100 covering hazardous material. The device 10 includes an inner split ring member 20 connected on one end 22 to a middle ring member 30 wherein the free end 21 of the split ring member 20 is inserted through a slit 101 in the plastic sheeting 100 to captively engage a generally circular portion of the plastic sheeting 100. A collar potion 41 having an outer ring portion 42 is provided with fastening means 51 for securing the device 10 together wherein the glovebag 200 is operatively connected to the collar portion 41.

Sammel, Alfred G. (Pittsburgh, PA)

1996-01-01T23:59:59.000Z

123

Semigroups and ring endomorphisms  

E-Print Network [OSTI]

. Consequently, Im A consists of only the 0 element of R which means that A is the zero map of R. Since this con- tradicts the hypothesis, we conclude that B is not one to one. ~Pttf 1. 2. zf A d B d phd f * r g R such that BB = A or BA = A then Ker B... contradicts the hypothesis. Thus Ker B/ImB ~ft ttd I I . . If B I ~ ** 1 Id ttty d PB- ism of a ring R such that BB ~ B then (1) Ker B P Im B (2) B is not one to one (3) B fixes every element in Im B (4) R is the group direct sum of Im B and Ker B...

McDaniel, Johnnie Carl

2012-06-07T23:59:59.000Z

124

Reversible Seeding in Storage Rings  

SciTech Connect (OSTI)

We propose to generate steady-state microbunching in a storage ring with a reversible seeding scheme. High gain harmonic generation (HGHG) and echo-enabled harmonic generation (EEHG) are two promising methods for microbunching linac electron beams. Because both schemes increase the energy spread of the seeded beam, they cannot drive a coherent radiator turn-by-turn in a storage ring. However, reversing the seeding process following the radiator minimizes the impact on the electron beam and may allow coherent radiation at or near the storage ring repetition rate. In this paper we describe the general idea and outline a proof-of-principle experiment. Electron storage rings can drive high average power light sources, and free-electron lasers (FELs) are now producing coherent light sources of unprecedented peak brightness While there is active research towards high repetition rate FELs (for example, using energy recovery linacs), at present there are still no convenient accelerator-based sources of high repetition rate, coherent radiation. As an alternative avenue, we recently proposed to establish steady-state microbunching (SSMB) in a storage ring. By maintaining steady-state coherent microbunching at one point in the storage ring, the beam generates coherent radiation at or close to the repetition rate of the storage ring. In this paper, we propose a method of generating a microbunched beam in a storage ring by using reversible versions of linac seeding schemes.

Ratner, Daniel; Chao, Alex; /SLAC

2011-12-14T23:59:59.000Z

125

CPP Status  

Broader source: Energy.gov (indexed) [DOE]

Protection Program (CPP) Protection Program (CPP) Status FY10 Jeff Mauth Project Manager May 19, 2010 1 Agenda  Sensor Integration  Sensor Deployment  CPP Portal  Mercury  Parting Comments  Questions 2 Sensor Integration Task Lead: Greg Thomas  Flo and Flower: Session Data  Snort: Network Intrusion Detection Data  AMP: Various Types of Network Data  PopQuiz: Various Types of Network Data  T3: Data Movement and Sensor Control 3 Sensor Deployment Task Lead: Liz Faultersack Certification and Accreditation Continued Expansion Hardware Refresh to Begin FY11 9 CPP Portal Task lead: Brett Didier Features Sharing Policy Data and Releases 13 CPP Portal Provides DOE cyber analysts access to CPP collected "DOE enterprise" data

126

1996 Wholesale Power and Transmission Rate Schedules.  

SciTech Connect (OSTI)

Bonneville Power Administration`s (BPA) 1996 Wholesale Power Rate Schedules, 1996 Ancillary Products and Services Rate Schedule, 1996 Transmission Rate Schedules, and General Rate Schedule Provisions, contained herein, were approved on an interim basis effective October 1, 1996. These rate schedules and provisions were approved by the Federal Energy Regulatory Commission (FERC), United States Department of Energy, in September 1996 (Docket Nos EF96-2011-000 and EF96f-2021-000). These rate schedules and General Rate Schedule Provisions were approved on a final basis by the FERC July 30, 1997, in Dept. of Energy--Bonneville Power Administration, Docket Nos. EF96-2011-000 and EF96-2021-000. Except as noted elsewhere, these 1996 rate schedules and provisions supersede BPA`s Wholesale Power Rate Schedules and General Rate Schedule Provisions, and Transmission Rate Schedules and General Transmission Rate Schedule Provisions, effective October 1, 1995. These rate schedules and general rate schedule provisions include all errata.

United States. Bonneville Power Administration.

1996-10-01T23:59:59.000Z

127

The Advanced Photon Source: A status report  

SciTech Connect (OSTI)

The Advanced Photon Source (APS) currently under construction at Argonne National Laboratory is scheduled for completion in early 1996. Both conventional facilities construction and technical fabrication is well underway. An update on the current state of civil construction as well as progress on storage ring and beamline technical component development will be presented. User activities have also proceeded at a rapid pace, particularly over the last year. In response to a call for Proposals for sectors, the APS received proposals for over twenty sectors from prospective Collaborative Access Teams (CATs). It is anticipated that beamline construction in the experiment hall could begin in approximately 18 months.

Mills, D.M.

1992-01-01T23:59:59.000Z

128

Argonne National Lab Cleanup schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Takes Steps to Complete Clean-Up of Argonne by 2003; Takes Steps to Complete Clean-Up of Argonne by 2003; Schedule for Shipping Waste to WIPP is 'Good News' for Illinois CARLSBAD, N.M., May 15, 2000 - The U.S. Department of Energy (DOE) reinforced plans to complete the clean-up of its Argonne National Laboratory-East site in Illinois by 2003 by accelerating its schedule for shipping transuranic waste to DOE's permanent disposal site in New Mexico. Previously, the shipments were not expected to begin before 2003. Under the accelerated schedule, shipments to DOE's Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico, are expected to begin in Spring 2001 and be completed by the end of the calendar year. Characterization of the waste currently stored at Argonne will begin this October. This agreement is a major step in honoring Argonne and DOE's commitment to the community to

129

NSLS-II Project Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NSLS-II Project Schedule NSLS-II Project Schedule Major Milestone Event Major Milestone Event Preliminary Schedule CD-0 (approve Mission Need) 4th quarter, FY2005 CD-1 (approve Alternative Selection and Cost Range) 4th quarter, FY2007 CD-2 (approve Performance Baseline) 1st quarter, FY2008 CD-3 (approve Start of Construction) 2nd quarter, FY2009 CD-4 (approve Start of Operations) FY2015 Critical Decisions The five Critical Decisions are major milestones approved by the Secretarial Acquisition Executive or Acquisition Executive that establish the mission need, recommended alternative, Acquisition Strategy, the Performance Baseline, and other essential elements required to ensure that the project meets applicable mission, design, security, and safety requirements. Each Critical Decision marks an increase in commitment of

130

Technical Qualification Program Accreditation Schedule  

Broader source: Energy.gov (indexed) [DOE]

Qualification Program (TQP) Accreditation Schedule Qualification Program (TQP) Accreditation Schedule (Note 1) Year 2013 2014 Month Jan Feb Mar Apr May Jun July Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec P Site/Office EM Sites/Offices Y Carlsbad Field Office ? Consolidated Business Center Y Office of River Protection (Note 3) ? Office of Site Support and Small Projects N Portsmouth/Paducah Project Office Y Richland Operations Office (Note 3) Y Savannah River Operations Office N Office of Environmental Management SC Sites/Offices

131

Multi-agent Cluster Scheduling for Scalability and Flexibility  

E-Print Network [OSTI]

of clusters scheduling and classical concurrency controlotherwise push control of task scheduling and execution towhich actively controls and modifies scheduling domains as

Konwinski, Andrew David

2012-01-01T23:59:59.000Z

132

Adaptive Scheduling in Ad Hoc and Cellular Wireless Networks  

E-Print Network [OSTI]

2004. 3 Joint Scheduling and Power Control for Multicastingusers. This joint scheduling and power control problem is38 Joint Scheduling and Power Control for Multicasting in

Tan, Choo Chin

2013-01-01T23:59:59.000Z

133

A Hybrid Bin-Packing Heuristic to Multiprocessor Scheduling  

E-Print Network [OSTI]

Abstract. The multiprocessor scheduling problem consists in schedul- ...... parallel machine scheduling", Production Planning and Control 9 (1998), 685{689. 9.

134

Pump-1-A Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1-A Wholesale Power Rate Schedule Pump-1-A Wholesale Power Rate Schedule Area: Carters & Russell Pumping System: Georgia-Alabama-South Carolina This rate schedule shall be...

135

Audit/Investigative Records Schedule (Revision 2) | Department...  

Office of Environmental Management (EM)

Investigative Records Schedule (Revision 2) AuditInvestigative Records Schedule (Revision 2) This schedule covers records associated with investigations other than those performed...

136

DOE RECORDS SCHEDULE FOR ENVIRONMENTAL RECORDS | Department of...  

Office of Environmental Management (EM)

DOE RECORDS SCHEDULE FOR ENVIRONMENTAL RECORDS DOE RECORDS SCHEDULE FOR ENVIRONMENTAL RECORDS This schedule provides for the disposition of U.S. Department of Energy (DOE) records...

137

Ion Rings for Magnetic Fusion  

SciTech Connect (OSTI)

This Final Technical Report presents the results of the program, Ion Rings for Magnetic Fusion, which was carried out under Department of Energy funding during the period August, 1993 to January, 2005. The central objective of the program was to study the properties of field-reversed configurations formed by ion rings. In order to reach this objective, our experimental program, called the Field-reversed Ion Ring Experiment, FIREX, undertook to develop an efficient, economical technology for the production of field-reversed ion rings. A field-reversed configuration (FRC) in which the azimuthal (field-reversing) current is carried by ions with gyro-radius comparable to the magnetic separatrix radius is called a field-reversed ion ring. A background plasma is required for charge neutralization of the ring, and this plasma will be confined within the ring's closed magnetic flux. Ion rings have long been of interest as the basis of compact magnetic fusion reactors, as the basis for a high-power accelerator for an inertial fusion driver, and for other applications of high power ion beams or plasmas of high energy density. Specifically, the FIREX program was intended to address the longstanding question of the contribution of large-orbit ions to the observed stability of experimental FRCs to the MHD tilt mode. Typical experimental FRCs with s {approx} 2-4, where s is the ratio of separatrix radius to ion gyro-radius, have been stable to tilting, but desired values for a fusion reactor, s > 20, should be unstable. The FIREX ring would consist of a plasma with large s for the background ions, but with s {approx} 1 for the ring ions. By varying the proportions of these two populations, the minimum proportion of large-orbit ions necessary for stability could be determined. The incorporation of large-orbit ions, perhaps by neutral-beam injection, into an FRC has been advanced for the purpose of stabilizing, heating, controlling angular momentum, and aiding the formation of a reactor-scale FRC, and the FIREX program was intended to test the ideas behind this approach. We will describe in this report the technological development path and advances in physics understanding that allowed FIREX to reach a regime in which ion rings were reproducibly created with up to about half the current necessary to produce field reversal. Unfortunately, the experiments were limited to this level by a fundamental, unanticipated aspect of the physics of strong ion rings in plasma. The FIREX ring is a strongly anisotropic, current-carrying population of ions moving faster than the Alfven speed in the background plasma. The rapidly changing ring current excites very large-amplitude Alfven waves in the plasma, and these waves strongly affect the ring, causing rapid energy loss in a way that is not compatible with the success of the ring trapping scenario around which FIREX was designed. The result was that FIREX rings were always very short-lived. We will discuss the implication of these results for possible future use of large-orbit ions in FRCs. In short, it appears that a certain range of the parameters characterizing the ring Alfven mach number and distribution function must be avoided to allow the existence of a long-lived energetic ion component in an FRC. This report will explain why FIREX experimental results cannot be directly scaled to quantitatively predict this range for a particular FRC configuration. This will require accurate, three-dimensional simulations. FIREX results do constitute a very good dataset for validating such a code, and simulations already carried out during this program provide a guide to the important physics involved.

Greenly, John, B.

2005-07-31T23:59:59.000Z

138

Friction between Ring Polymer Brushes  

E-Print Network [OSTI]

Friction between ring-polymer brushes at melt densities sliding past each other are studied using extensive course-grained molecular dynamics simulations and scaling arguments, and the results are compared to the friction between linear-polymer brushes. We show that for a velocity range spanning over three decades, the frictional forces measured for ring-polymer brushes are half the corresponding friction in case of linear brushes. In the linear-force regime, the weak inter-digitation of two ring brushes compared to linear brushes also leads to a lower number of binary collisions between the monomers of opposing brushes. At high velocities, where the thickness of the inter-digitation layer between two opposing brushes is on the order monomer size regardless of brush topology, stretched segments of ring polymers take a double-stranded conformation. As a result, monomers of the double-stranded segments collide less with the monomers of the opposing ring brush even though a similar number of monomers occupies the inter-digitation layer for ring and linear-brush bilayers. The numerical data obtained from our simulations is consistent with the proposed scaling analysis. Conformation-dependent frictional reduction observed in ring brushes can have important consequences in non-equilibrium bulk systems.

A. Erbas; J. Paturej

2015-01-07T23:59:59.000Z

139

SCHEDULE OF FEES Wet Milling  

E-Print Network [OSTI]

SCHEDULE OF FEES Wet Milling 100 g.......................$120..per sample* 1 kilogram of Illinois offers five milling procedures to determine processing characteristics of corn. Laboratory times. WET MILLING The wet milling process is used to produce starch (99.6% purity) as the primary

Illinois at Urbana-Champaign, University of

140

Optimization of Injection Scheduling in  

E-Print Network [OSTI]

SGP-TR-I12 Optimization of Injection Scheduling in Geothermal Fields James Lovekin May 1987&injection optimization problem is broke$ into two subpmbkm:(1) choosing a configuration of injectorsfrom an existing set is defined as the fieldwide break- through lindex, B. Injection is optimized by choosing injection wells

Stanford University

Note: This page contains sample records for the topic "ring status schedules" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Scheduling & Resources - Power Marketing - Sierra Nevada Region...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Marketing > Scheduling & Resources Scheduling & Resources - Greenbook 2004 (PDF - 1.04MB) - CVP Gross Power (XLS - 5.25MB) - CVP BaseResource (XLS - 2.02MB) - WY2002 Analysis (XLS...

142

Human aspects of scheduling : a case study  

E-Print Network [OSTI]

This work presents a look at real-life production-floor scheduling, comparing and contrasting it to both normative OR theory and Cognitive Psychology theory. Relevant literature in OR, scheduling and psychology is reviewed, ...

Boasson, Yishai, 1973-

2006-01-01T23:59:59.000Z

143

Medical Exam Scheduling - HPMC Occupational Health Services  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Analysis Human Reliability Program (HRP) Industrial Rehabilitation & Ergonomics Infection Control & Immunizations Influenza Immunization Program Medical Exam Scheduling Medical...

144

Multi-Year Schedule | Department of Energy  

Energy Savers [EERE]

DOE's currently scheduled rulemaking activities for energy conservation standards and test procedures. multiyearscheduleaug2011.pdf More Documents & Publications 9th...

145

ADMINISTRATIVE RECORDS SCHEDULE 17: CARTOGRAPHIC, AERIAL PHOTOGRAPHIC...  

Office of Environmental Management (EM)

CARTOGRAPHIC, AERIAL PHOTOGRAPHIC, ARCHITECTURAL, ENGINEERING, AND FACILITY MANAGEMENT RECORDS ADMINISTRATIVE RECORDS SCHEDULE 17: CARTOGRAPHIC, AERIAL PHOTOGRAPHIC, ARCHITECTURAL,...

146

ADMINISTRATIVE RECORDS SCHEDULE 5: BUDGET PREPARATION, PRESENTATION...  

Broader source: Energy.gov (indexed) [DOE]

5: BUDGET PREPARATION, PRESENTATION, AND APPORTIONMENT RECORDS ADMINISTRATIVE RECORDS SCHEDULE 5: BUDGET PREPARATION, PRESENTATION, AND APPORTIONMENT RECORDS Budget and...

147

ADMINISTRATIVE RECORDS SCHEDULE 5: BUDGET PREPARATION, PRESENTATION...  

Broader source: Energy.gov (indexed) [DOE]

5: BUDGET PREPARATION, PRESENTATION, AND APPORTIONMENT ADMINISTRATIVE RECORDS SCHEDULE 5: BUDGET PREPARATION, PRESENTATION, AND APPORTIONMENT Budget and apportionment records...

148

Move Frame Scheduling and Mixed SchedulingAllocation for the Automated Synthesis of Digital Systems y  

E-Print Network [OSTI]

steps: 1) Data path synthe­ sis (operation scheduling and hardware allocation), and 2) Control path design. In the scheduling phase, operations are assigned to the appropriate control steps. The allocaMove Frame Scheduling and Mixed Scheduling­Allocation for the Automated Synthesis of Digital

Nourani, Mehrdad

149

DYNAMIC SCHEDULING M. C. H. Wright  

E-Print Network [OSTI]

for a time interval after which control is returned to the scheduling program to determine the best project who wants more time to evaluate their data can return control to the scheduling program, and come backDYNAMIC SCHEDULING M. C. H. Wright Radio Astronomy Laboratory, University of California, Berkeley

Militzer, Burkhard

150

CPU Inheritance Scheduling Bryan Ford Sai Susarla  

E-Print Network [OSTI]

, providing much greater scheduling flexibil­ ity. Modular, hierarchical control can be provided over systems control the sharing of the machine's CPU resources among threads using a fixed scheduling schemeCPU Inheritance Scheduling Bryan Ford Sai Susarla Department of Computer Science University of Utah

Ford, Bryan

151

CPU Inheritance Scheduling Bryan Ford Sai Susarla  

E-Print Network [OSTI]

, providing much greater scheduling flexibil- ity. Modular, hierarchical control can be provided overCPU Inheritance Scheduling Bryan Ford Sai Susarla Department of Computer Science University of Utah processor scheduling mechanisms in operat- ing systems are fairly rigid, often supportingonly one fixed

Ford, Bryan

152

Models for Train Scheduling Krishna C. Jha  

E-Print Network [OSTI]

Models for Train Scheduling Krishna C. Jha Vice President - Research & Development krishna/analytics, and packaging into web-based map-based interfaces. Innovative Scheduling Overview #12;-3- The train schedule is one of most critical components in the passenger or freight transportations. The quality of a train

Bustamante, Fabián E.

153

Batch Scheduling with Deadlines on Parallel Machines  

E-Print Network [OSTI]

Batch Scheduling with Deadlines on Parallel Machines Peter Brucker Mikhail Y. Kovalyov, Yakov M of scheduling G groups of jobs on m parallel machines is considered. Each group consists of several identical) and to schedule the batches on the machines. It is possible for different batches of the same group

Magdeburg, Universität

154

Ring resonant cavities for spectroscopy  

DOE Patents [OSTI]

Ring-shaped resonant cavities for spectroscopy allow a reduction in optical feedback to the light source, and provide information on the interaction of both s- and p-polarized light with samples. A laser light source is locked to a single cavity mode. An intracavity acousto-optic modulator may be used to couple light into the cavity. The cavity geometry is particularly useful for Cavity Ring-Down Spectroscopy (CRDS). 6 figs.

Zare, R.N.; Martin, J.; Paldus, B.A.; Xie, J.

1999-06-15T23:59:59.000Z

155

Flow shop scheduling with peak power consumption constraints  

E-Print Network [OSTI]

Mar 29, 2012 ... Flow shop scheduling with peak power consumption constraints ... Keywords: scheduling, flow shop, energy, peak power consumption, integer...

K. Fang

2012-03-29T23:59:59.000Z

156

Double acting stirling engine piston ring  

DOE Patents [OSTI]

A piston ring design for a Stirling engine wherein the contact pressure between the piston and the cylinder is maintained at a uniform level, independent of engine conditions through a balancing of the pressure exerted upon the ring's surface and thereby allowing the contact pressure on the ring to be predetermined through the use of a preloaded expander ring.

Howarth, Roy B. (Clifton Park, NY)

1986-01-01T23:59:59.000Z

157

Quantum Fourier Transform Over Galois Rings  

E-Print Network [OSTI]

Galois rings are regarded as "building blocks" of a finite commutative ring with identity. There have been many papers on classical error correction codes over Galois rings published. As an important warm-up before exploring quantum algorithms and quantum error correction codes over Galois rings, we study the quantum Fourier transform (QFT) over Galois rings and prove it can be efficiently preformed on a quantum computer. The properties of the QFT over Galois rings lead to the quantum algorithm for hidden linear structures over Galois rings.

Yong Zhang

2009-04-16T23:59:59.000Z

158

Microsoft Word - Changes-to-Schedules _Recovered_  

Broader source: Energy.gov (indexed) [DOE]

Changes-to-Schedules Changes-to-Schedules REV 5 DOE Administrative Records Schedules Changes Last revised: 12/10/2010 Date DOE Admin Schedule Item(s) Change Authorizing Document 9/15/10 - 12/10/2010 1-6, 9, 11-12, 14, 16-18, 22- 23 Various Removal of items at the end of each schedule for e-mail and word processing copies, which were added to the GRS in Transmittal Number 8. For schedules in which this item is located elsewhere and removal would cause changes in the sequence of item numbers, the item was changed to "Reserved" (Schedules ,4,5, and 14.) GRS Transmittal Number 22 9/15/2010 1 23.b.(3) Deleted citation, 5 CFR 214. GRS Transmittal Number 22 1 25.a. Text deleted "and as described in 29 CFR 1614." GRS Transmittal Number 22

159

This Week In Petroleum Schedule  

U.S. Energy Information Administration (EIA) Indexed Site

This Week In Petroleum Schedule This Week In Petroleum Schedule Holiday Release Schedule for the This Week In Petroleum The standard release time and day of the week will be after 1:00 p. m. (Eastern time) on Wednesdays with the following exceptions. Data for the week ending Alternate Release Date Release Day Release Time Holiday November 8, 2013 November 14, 2013 Thursday after 1:00 p.m. Veterans December 20, 2013 December 27, 2013 Friday after 1:00 p.m. Christmas December 27, 2013 January 3, 2014 Friday after 1:00 p.m. New Year's January 17, 2014 January 23, 2014 Thursday after 1:00 p.m. Martin Luther King Jr. February 14, 2014 February 20, 2014 Thursday after 1:00 p.m. President's May 23, 2014 May 29, 2014 Thursday after 1:00 p.m. Memorial August 29, 2014 September 4, 2014 Thursday after 1:00 p.m. Labor

160

1998 SSRL Accelerator Physics Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SSRL Accelerator Physics Schedule SSRL Accelerator Physics Schedule Proposal Deadline Schedule Announcement Experimental Period Duration Tue, Nov 11, 17:00 Wed, Nov 12, '97 17:00 Mon, Nov 17, '97 18:00-Wed, Nov 19, '97 02:00 32 hrs Mon, Dec 01, '97 17:00 Tue, Dec 02, '97 13:00 Mon, Dec 08, '97 06:00-Wed, Dec 10, '97 02:00 44 hrs Mon, Jan 05, 17:00 Tue, Jan 06, 13:00 Mon, Jan 12, 18:00-Wed, Jan 14, 02:00 32 hrs Fri, Jan 16, 17:00 Tue, Jan 20, 13:00 Mon, Jan 26, 06:00-Wed, Jan 28, 02:00 44 hrs Mon, Feb 02, 17:00 Tue, Feb 03, 13:00 Tue, Feb 10, 18:00-Thu, Feb 12, 02:00 32 hrs Tue, Feb 17, 17:00 Wed, Feb 18, 17:00 Mon, Feb 23, 06:00-Wed, Feb 25, 02:00 44 hrs Mon, Mar 02, 17:00 Tue, Mar 03, 13:00 Mon, Mar 09, 18:00-Wed, Mar 11, 02:00 32 hrs Mon, Mar 16, 17:00 Tue, Mar 17, 13:00 Mon, Mar 23, 06:00-Wed, Mar 25, 02:00 44 hrs

Note: This page contains sample records for the topic "ring status schedules" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

1997 SSRL Accelerator Physics Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SSRL Accelerator Physics Schedule SSRL Accelerator Physics Schedule Proposal Deadline Schedule Announcement Experimental Period Duration Mon, Nov 11, '96 17:00 Tue, Nov 12, '96 13:00 Tue, Nov 19, '96 15:00-Wed, Nov 20, '96 02:00 11 hrs Mon, Dec 02, '96 17:00 Tue, Dec 03, '96 13:00 Mon, Dec 09, '96 06:00-Wed, Dec 11, '96 02:00 44 hrs Mon, Jan 06, 17:00 Tue, Jan 07, 13:00 Mon, Jan 13, 18:00-Wed, Jan 15, 02:00 32 hrs Mon, Jan 20, 17:00 Tue, Jan 21, 13:00 Mon, Jan 27, 06:00-Wed, Jan 29, 02:00 44 hrs Mon, Feb 03, 17:00 Tue, Feb 04, 13:00 Tue, Feb 11, 18:00-Thu, Feb 13, 02:00 32 hrs Mon, Feb 18, 09:30 Tue, Feb 18, 13:00 Mon, Feb 24, 06:00-Wed, Feb 26, 02:00 44 hrs Mon, Mar 03, 17:00 Tue, Mar 04, 13:00 Mon, Mar 10, 18:00-Wed, Mar 12, 02:00 32 hrs Mon, Mar 17, 17:00 Tue, Mar 18, 13:00 Mon, Mar 24, 06:00-Wed, Mar 26, 02:00 44 hrs

162

2000 SSRL Accelerator Physics Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SSRL Accelerator Physics Schedule SSRL Accelerator Physics Schedule Proposal Deadline Schedule Announcement Experimental Period Duration Mon, Nov 08, '99 17:00 Tue, Nov 09, '99 13:00 Mon, Nov 15, '99 18:00-Wed, Nov 17, '99 02:00 32 hrs Mon, Nov 29, '99 17:00 Tue, Nov 30, '99 13:00 Mon, Dec 06, '99 06:00-Wed, Dec 08, '99 02:00 44 hrs Mon, Jan 03, 17:00 Tue, Jan 04, 13:00 Mon, Jan 10, 18:00-Wed, Jan 12, 02:00 32 hrs Fri, Jan 14, 17:00 Tue, Jan 18, 13:00 Mon, Jan 24, 06:00-Wed, Jan 26, 02:00 44 hrs Mon, Feb 14, 17:00 Tue, Feb 15, 17:00 Tue, Feb 22, 06:00-Thu, Feb 24, 02:00 44 hrs Mon, Feb 28, 17:00 Tue, Feb 29, 13:00 Mon, Mar 06, 18:00-Wed, Mar 08, 02:00 32 hrs Mon, Mar 13, 17:00 Tue, Mar 14, 13:00 Mon, Mar 20, 06:00-Wed, Mar 22, 02:00 44 hrs Mon, Apr 10, 17:00 Tue, Apr 11, 13:00 Mon, Apr 17, 06:00-Wed, Apr 19, 02:00 44 hrs

163

2002 SSRL Accelerator Physics Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SSRL Accelerator Physics Schedule SSRL Accelerator Physics Schedule Proposal Deadline Schedule Announcement Experimental Period Duration Mon, Nov 05, '01 17:00 Tue, Nov 06, '01 13:00 Mon, Nov 12, '01 18:00-Wed, Nov 14, '01 02:00 32 hrs Mon, Dec 03, '01 17:00 Tue, Dec 04, '01 13:00 Mon, Dec 10, '01 06:00-Wed, Dec 12, '01 02:00 44 hrs Mon, Dec 17, '01 09:00 Tue, Dec 18, '01 13:00 Mon, Jan 07, 18:00-Wed, Jan 9, 02:00 32 hrs Mon, Jan 14, 12:00 Tue, Jan 15, 13:00 Tue, Jan 22, 06:00-Thu, Jan 24, 02:00 44 hrs Mon, Jan 28, 17:00 Tue, Jan 29, 17:00 Tue, Feb 05, 18:00-Thu, Feb 07, 02:00 32 hrs Mon, Feb 11, 17:00 Tue, Feb 12, 17:00 Tue, Feb 19, 06:00-Wed, Feb 20, 02:00 20 hrs Mon, Feb 25, 17:00 Tue, Feb 26, 13:00 Mon, Mar 04, 18:00-Wed, Mar 06, 02:00 32 hrs Mon, Mar 11, 17:00 Tue, Mar 12, 13:00 Mon, Mar 18, 06:00-Wed, Mar 20, 02:00 44 hrs

164

1999 SSRL Accelerator Physics Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

9 SSRL Accelerator Physics Schedule 9 SSRL Accelerator Physics Schedule Proposal Deadline Schedule Announcement Experimental Period Duration Mon, Nov 30, '98 17:00 Tue, Dec 01, '98 13:00 Mon, Dec 07, '98 06:00-Wed, Dec 09, '98 02:00 44 hrs Mon, Jan 04, 17:00 Tue, Jan 05, 13:00 Mon, Jan 11, 18:00-Wed, Jan 13, 02:00 32 hrs Fri, Jan 15, 17:00 Tue, Jan 19, 13:00 Mon, Jan 25, 06:00-Wed, Jan 27, 02:00 44 hrs Mon, Feb 01, 17:00 Tue, Feb 02, 13:00 Tue, Feb 09, 18:00-Thu, Feb 11, 02:00 32 hrs Tue, Feb 16, 17:00 Wed, Feb 17, 17:00 Mon, Feb 22, 06:00-Wed, Feb 24, 02:00 44 hrs Mon, Mar 01, 17:00 Tue, Mar 02, 13:00 Mon, Mar 08, 18:00-Wed, Mar 10, 02:00 32 hrs Mon, Mar 15, 17:00 Tue, Mar 16, 13:00 Mon, Mar 22, 06:00-Wed, Mar 24, 02:00 44 hrs Mon, Apr 12, 17:00 Tue, Apr 13, 13:00 Mon, Apr 19, 06:00-Wed, Apr 21, 02:00 44 hrs

165

NSLS Booster & Linac Ring  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Booster & Linac Ring Booster & Linac Ring Booster Operating Parameters (pdf) Lattice Information (pdf) Mechanical Drawing (pdf) Standard Operating Mode Electrons are injected into the NSLS storage rings from a 750 MeV booster synchrotron fed by a 120 MeV linac. The electrons are first produced in a 100 KeV triode electron gun. The gun is pulsed at the booster revolution period, 94.6 nsec, seven times per booster cycle. Each pulse is 5 nsec long and supplies about 17 microbunches in the linac. After acceleration in the linac, the beam is injected into the booster on seven successive turns. Multi-turn injection in the booster is accomplished in the following way: The beam is deflected into the booster by a septum magnet. The first linac pulse goes around the booster and returns to the injection point just as

166

Microsoft Word - PoRiver Project Schedule - Letter to DOE_042807.doc  

Broader source: Energy.gov (indexed) [DOE]

30, 2007 30, 2007 Lawrence Mansueti Office of Electricity Delivery and Energy Reliability U.S. Department of Energy Rm. 8H-033 1000 Independence Avenue Washington, D.C. 20585 Re: Potomac River Project Outage Schedule Clarification Dear Mr. Mansueti: I am writing to clarify the upcoming outage schedule for the Potomac River project and to explain certain discrepancies that are present in Pepco's most recent communications. 1 The monthly status report submitted to the Federal Energy Regulatory Commission ("FERC") on April 16, 2007 shows the upcoming outages for the two additional transmission circuits as May 1, 2007 through May 21, 2007 (Circuit 1) and as May 24, 2007 through June 21, 2007 (Circuit 2). In an e-mail sent by Steve Alexander on April 27, 2007, Pepco reflected the current outage schedule for Circuit 1.

167

Modules over principal ideal rings  

E-Print Network [OSTI]

need to note, however, , the difference between the two types of "union" of a set of submodules N 1 of a module N, The first is the "set-theoretic union" con- sisting of representatives of all the distinct elements to be found in the Ni... ideal R, which cons1sts of the elements of the ring. Consider the subset B of R of all elements of the form ra + na, where r and a are ring ele- ments and n is an integer. If rla + nla, r2a + n2a s B, then la + nla 2 2a la r2a + la 2 = (rl - r2)a...

Vieaux, Jules Bellin

2012-06-07T23:59:59.000Z

168

Magnetism in tunable quantum rings  

Science Journals Connector (OSTI)

We have studied the spin structure of circular four-electron quantum rings using tunable confinement potentials. The calculations were done using the exact diagonalization method. Our results indicate that ringlike systems can have oscillatory flips between ferromagnetic and antiferromagnetic behavior as a function of the magnetic field. Furthermore, at constant external magnetic fields there were seen similar oscillatory changes between ferromagnetism and antiferromagnetism when the system parameters were changed. According to our results, the magnetism of quantum rings could be tuned by system parameters.

G. Brdsen; E. Tl; A. Harju

2009-11-10T23:59:59.000Z

169

VPP Participant Status  

Broader source: Energy.gov [DOE]

The VPP Participant Status document lists all the DOE VPP participants and their current status within the VPP Program. Additionally, participant information includes governing program office and estimated number of employees for each participant.

170

Plans and Schedules | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Appliance & Equipment Standards » About » Plans and Schedules Appliance & Equipment Standards » About » Plans and Schedules Plans and Schedules The Appliances and Equipment Standards program maintains a multi-year rulemaking schedule. The currently scheduled rulemaking activities are described in the program's semi-annual implementation report to Congress. The program will also issue other plans and schedules when needed. The most recent 5-year plan was released in October 2010 and outlines how the program planned to meet all the statutory requirements established in the Energy Policy and Conservation Act of 1975, as amended. Expedited Rulemakings In November 2010, the Department of Energy (DOE) adopted new procedures that enable certain rulemakings to be expedited or improve the efficiency of the rulemaking process:

171

Definition: Net Interchange Schedule | Open Energy Information  

Open Energy Info (EERE)

Interchange Schedule Interchange Schedule Jump to: navigation, search Dictionary.png Net Interchange Schedule The algebraic sum of all Interchange Schedules with each Adjacent Balancing Authority.[1] Related Terms Balancing Authority, Adjacent Balancing Authority, Interchange, Interchange Schedule, smart grid References ↑ Glossary of Terms Used in Reliability Standards An inli LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ne Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Net_Interchange_Schedule&oldid=502531" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load)

172

APS Long Range Operations Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2) 2) Alternate Formats: iCal | Excel | PDF APS Long-Range Operation Schedule 2011-3 2012-1 2012-2 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5

173

APS Long Range Operations Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1) 1) Alternate Formats: iCal | Excel | PDF APS Long-Range Operation Schedule 2010-3 2011-1 2011-2 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5

174

APS Long Range Operations Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3) 3) Alternate Formats: iCal | Excel | PDF APS Long-Range Operation Schedule 2012-3 2013-1 2013-2 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5

175

Cavity-locked ring down spectroscopy  

DOE Patents [OSTI]

Distinct locking and sampling light beams are used in a cavity ring-down spectroscopy (CRDS) system to perform multiple ring-down measurements while the laser and ring-down cavity are continuously locked. The sampling and locking light beams have different frequencies, to ensure that the sampling and locking light are decoupled within the cavity. Preferably, the ring-down cavity is ring-shaped, the sampling light is s-polarized, and the locking light is p-polarized. Transmitted sampling light is used for ring-down measurements, while reflected locking light is used for locking in a Pound-Drever scheme.

Zare, Richard N. (Stanford, CA); Paldus, Barbara A. (Stanford, CA); Harb, Charles C. (Palo Alto, CA); Spence, Thomas (Union City, CA)

2000-01-01T23:59:59.000Z

176

Status report on resolution of Waste Tank Safety Issues at the Hanford Site. Revision 1  

SciTech Connect (OSTI)

The purpose of this report is to provide and update the status of activities supporting the resolution of waste tank safety issues and system deficiencies at the Hanford Site. This report provides: (1) background information on safety issues and system deficiencies; (2) a description of the Tank Waste Remediation System and the process for managing safety issues and system deficiencies; (3) changes in safety issue description, prioritization, and schedules; and (4) a summary of the status, plans, order of magnitude, cost, and schedule for resolving safety issues and system deficiencies.

Dukelow, G.T.; Hanson, G.A. [Los Alamos Technical Associates, Inc., Kennewick, WA (United States)

1995-05-01T23:59:59.000Z

177

Scheduling of a parallel workload: Implementation and use of the argonne easy scheduler at PDC  

Science Journals Connector (OSTI)

Scheduling of a workload of parallel jobs on a large parallel computer puts specific demands on a scheduling system. Especially if the objective is to give a good service for the largest parallel jobs. In this pa...

Lars Malinowsky; Per ster

1998-01-01T23:59:59.000Z

178

Robustness in Combinatorial Optimization and Scheduling Theory ...  

E-Print Network [OSTI]

ten years in the area of combinatorial optimization and scheduling theory .... with robust reformulation of optimization model by adapting robust control...

2006-09-26T23:59:59.000Z

179

Scheduling with Fixed Maintenance, Shared Resources and ...  

E-Print Network [OSTI]

Nov 17, 2014 ... The resulting problem is a non-linear scheduling problem with .... Once the grade control plan is constructed we need to solve the utilization...

2014-11-24T23:59:59.000Z

180

EM Quality Assurance Assessment Schedule FY 2010  

Broader source: Energy.gov [DOE]

Attached for planning and coordination purposes is the updated Quality Assurance(QA) assessment schedule for the remainder of fiscal year (FY) 2010.

Note: This page contains sample records for the topic "ring status schedules" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Rate Schedule PACI-T3  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

receipt, adjusted for losses, and delivered to points of delivery. This service includes scheduling and system control and dispatch service needed to support the transmission...

182

Proposal Submittal and Scheduling Procedures Entry Page  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Proposal Submittal and Scheduling Procedures for Research at SSRL X-rayVUV Macromolecular Crystallography SSRL is funded by the Department of Energy, Office of Basic Energy...

183

Machine scheduling using the Bees algorithm.  

E-Print Network [OSTI]

??Single-machine scheduling is the process of assigning a group of jobs to a machine. The jobs are arranged so that a performance measure, such as (more)

Phrueksanant, Janyarat

2013-01-01T23:59:59.000Z

184

Construction project scheduling problem with uncertain resource ...  

E-Print Network [OSTI]

... on-going activities. 7 Conclusions and future work .... constrained construction scheduling, Journal of Computing in Civil Engineering, 13(3),. 207-216. [23] Liu...

2004-06-01T23:59:59.000Z

185

Work Schedules | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

job performance, improve morale and help reduce work-related stress, as well as reduce air pollution and traffic congestion. Participation in either the alternate work schedule...

186

ADMINISTRATIVE RECORDS SCHEDULE 4: PROPERTY DISPOSAL RECORDS...  

Broader source: Energy.gov (indexed) [DOE]

4: PROPERTY DISPOSAL RECORDS (Revision 2) ADMINISTRATIVE RECORDS SCHEDULE 4: PROPERTY DISPOSAL RECORDS (Revision 2) These records pertain to the sales by agencies of real and...

187

ADMINISTRATIVE RECORDS SCHEDULE 17: CARTOGRAPHIC, AERIAL PHOTOGRAPHIC...  

Broader source: Energy.gov (indexed) [DOE]

activities. Many of these records have continuing historical value after they are no longer of use to the Department. This records schedule covers only disposable records...

188

Renewable Fuel Standard Schedule | Open Energy Information  

Open Energy Info (EERE)

Standard Schedule Standard Schedule Jump to: navigation, search Name Renewable Fuel Standard Schedule Sector Liquid Transportation Fuels Spatial Resolution National Geographic Scope United States Temporal Resolution Annual The United States Environmental Protection Agency, under the National Renewable Fuel Standard program and as required by the Energy Independence and Security Act of 2007 (EISA), periodically revises the volumetric standards for cellulosic biofuel, biomass-based diesel, advanced biofuel, and total renewable fuel that must be used in transportation fuel each year. The table below lists the current RFS2 schedule in billions of gallons: Year Renewable Biofuel Advanced Biofuel Cellulosic Biofuel Biomass-based Diesel Undifferentiated Total 2008 9 9

189

APS Long Range Schedule 2000  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

APS FY2000 Beamline Operations Schedule APS FY2000 Beamline Operations Schedule JAN Monday Tuesday Wednesday Thursday Friday Saturday Sunday Week 1 10 11 12 13 14 15 16 0000-0800 SM SM SM SM SM MS MS 0800 - 1600 SM SM SM SM MS MS MS 1600 - 2400 SM SM SM SM MS MS MS Week 2 17 18 19 20 21 22 23 0000 - 0800 MS MS MS UO UO UO UO 0800 - 1600 MS MS UO UO UO UO UO 1600 - 2400 MS MS UO UO UO UO UO Week 3 24 25 26 27 28 29 30 0000 - 0800 UO UO UO UO UO UO UO 0800 - 1600 UO MS UO UO UO UO UO 1600 - 2400 UO UO UO UO UO UO UO JAN/FEB 31 1 2 3 4 5 6 0000 - 0800 UO MS MS UO UO UO UO 0800 - 1600 MS MS UO UO UO UO UO 1600 - 2400 MS MS UO UO UO UO UO Week 5 7 8 9 10 11 12 13 0000 - 0800 UO UO UO UO UO UO UO

190

Environmental surveillance master sampling schedule  

SciTech Connect (OSTI)

This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of the onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site.

Bisping, L.E.

1994-02-01T23:59:59.000Z

191

Schedule optimization study implementation plan  

SciTech Connect (OSTI)

This Implementation Plan is intended to provide a basis for improvements in the conduct of the Environmental Restoration (ER) Program at Hanford. The Plan is based on the findings of the Schedule Optimization Study (SOS) team which was convened for two weeks in September 1992 at the request of the U.S. Department of Energy (DOE) Richland Operations Office (RL). The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit (OU) Remedial Investigation/Feasibility Study (RI/FS) Work Plan. The SOS team was comprised of independent professionals from other federal agencies and the private sector experienced in environmental restoration within the federal system. The objective of the team was to examine reasons for the lengthy RI/FS process and recommend ways to expedite it. The SOS team issued their Final Report in December 1992. The report found the most serious impediments to cleanup relate to a series of management and policy issues which are within the control of the three parties managing and monitoring Hanford -- the DOE, U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology). The SOS Report identified the following eight cross-cutting issues as the root of major impediments to the Hanford Site cleanup. Each of these eight issues is quoted from the SOS Report followed by a brief, general description of the proposed approach being developed.

Not Available

1993-11-01T23:59:59.000Z

192

Used Fuel Disposition Campaign Phase I Ring Compression Testing...  

Broader source: Energy.gov (indexed) [DOE]

Phase I Ring Compression Testing of High Burnup Cladding Used Fuel Disposition Campaign Phase I Ring Compression Testing of High Burnup Cladding The purpose of ring compression...

193

Heuristic status polling  

DOE Patents [OSTI]

Methods, compute nodes, and computer program products are provided for heuristic status polling of a component in a computing system. Embodiments include receiving, by a polling module from a requesting application, a status request requesting status of a component; determining, by the polling module, whether an activity history for the component satisfies heuristic polling criteria; polling, by the polling module, the component for status if the activity history for the component satisfies the heuristic polling criteria; and not polling, by the polling module, the component for status if the activity history for the component does not satisfy the heuristic criteria.

Archer, Charles J. (Rochester, MN); Blocksome, Michael A. (Rochester, MN); Heidelberger, Philip (Cortlandt Manor, NY); Kumar, Sameer (White Plains, NY); Parker, Jeffrey J. (Rochester, MN); Ratterman, Joseph D. (Rochester, MN)

2011-06-07T23:59:59.000Z

194

Genetic-based scheduling to solve the parcel hub scheduling problem  

Science Journals Connector (OSTI)

The parcel hub scheduling problem (PHSP) is scheduling problem that is common in the parcel delivery industry. The PHSP consists of scheduling a set of inbound trailers containing a batch of heterogeneous parcels to a set of unload docks with the objective ... Keywords: Distribution, Genetic algorithm, Parcel, Sortation, Work load balancing

Douglas L. McWilliams

2009-05-01T23:59:59.000Z

195

An Optimal General Purpose Scheduler for Networked Control Systems  

E-Print Network [OSTI]

An Optimal General Purpose Scheduler for Networked Control Systems Ahmed Elmahdi , Ahmad F Taha to control the time delay is to im- prove the scheduling criterion. This paper proposes an optimal scheduling the stability of the control system. The proposed optimal schedul- ing protocol is a hybrid scheduling criterion

Sun, Dengfeng

196

Pattern formation in the exciton inner ring  

Science Journals Connector (OSTI)

We report on the two-beam study of indirect excitons in the inner ring in the exciton emission pattern. One laser beam generates the inner ring and a second weaker beam is positioned in the inner ring. The beam positioned in the inner ring is found to locally suppress the exciton emission intensity. We also report on the inner ring fragmentation and formation of multiple rings in the inner ring region. These features are found to originate from a weak spatial modulation of the excitation beam intensity in the inner ring region. The modulation of exciton emission intensity anticorrelates with the modulation of the laser excitation intensity. The three phenomenainner ring fragmentation, formation of multiple rings in the inner ring region, and emission suppression by a weak laser beam in the inner ringhave a common feature: a reduction of exciton emission intensity in the region of enhanced laser excitation. This effect is explained in terms of exciton transport and thermalization.

M. Remeika, A. T. Hammack, S. V. Poltavtsev, L. V. Butov, J. Wilkes, A. L. Ivanov, K. L. Campman, M. Hanson, and A. C. Gossard

2013-09-17T23:59:59.000Z

197

Retail Store Scheduling for Profit Nicolas Chapadosa  

E-Print Network [OSTI]

Retail Store Scheduling for Profit Nicolas Chapadosa , Marc Joliveaub , Pierre L'Ecuyera , Louis for retail stores has received relatively scant attention. Current approaches typically attempt to minimize the retail scheduling problem in terms of operating profit maximization, explicitly recognizing the dual role

L'Ecuyer, Pierre

198

Online Deadline Scheduling with Bounded Energy Efficiency  

E-Print Network [OSTI]

Online Deadline Scheduling with Bounded Energy Efficiency Joseph Wun-Tat Chan1 , Tak-Wah Lam 2 concern when compared to throughput and the schedules targeted may be very poor in energy efficiency subject to a user-defined threshold of energy efficiency. We first show that all deterministic online

Wong, Prudence W.H.

199

PROJECT SCHEDULING: IMPROVED APPROACH TO INCORPORATE  

E-Print Network [OSTI]

] project scheduling inevitably involves uncertainty. The basic inputs (i.e., time, cost, and resourcesPROJECT SCHEDULING: IMPROVED APPROACH TO INCORPORATE UNCERTAINTY USINC BAYESIAN NETWORKS VAHID, there is a causal relationship between these uncertainty sources and project parameters; this causality

Neil, Martin

200

Modeling realistic hybrid flexible flowshop scheduling problems  

Science Journals Connector (OSTI)

This paper aims to contribute to the recent research efforts to bridge the gap between the theory and the practice of scheduling by modelizing a realistic manufacturing environment and analyzing the effect of the inclusion of several characteristics ... Keywords: Hybrid flexible flowshop, Precedence constraints, Realistic scheduling, Sequence-dependent setup times

Rubn Ruiz; Funda Sivrikaya ?erifo?lu; Thijs Urlings

2008-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "ring status schedules" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Electrical Engineering Technology (EET) LONG RANGE SCHEDULE  

E-Print Network [OSTI]

and Machinery C T C T EET 365W Electrical Power & Machinery Laboratory C C, V V C C, V V EET 370T Energy=Virtual Laboratory, W=Web based This schedule is tentative. All Course offerings are subject to minimum enrollmentElectrical Engineering Technology (EET) LONG RANGE SCHEDULE Course Number and Name Fall 2010 Spr

202

Operations scheduling in job-shops  

E-Print Network [OSTI]

This thesis is in the area of operations scheduling in an automated or semi-automated job-shop system, where parts with various routings contend for service on the resources in the system. The classical job-shop scheduling problem has usually been...

Srinivasan, Anand

2012-06-07T23:59:59.000Z

203

Stabilizer Codes over Frobenius Rings  

E-Print Network [OSTI]

elements so that B = fjxi jx 2 Rg: 20 The addition and multiplication in the ring R will be used to de ne unitary shift and multiplication operators on Cq. Indeed, for each a in R, we de ne a shift operator X(a) : Cq ! Cq by X(a)jxi = jx+ ai for all x...((ajb)) to be the number of indices i such that ai 6= 0 or bi 6= 0. It follows from these de nitions that wt(!cX(a)Z(b)) = swt((ajb)): Let R be a ring with q elements. Let S be a subgroup of Gn. The stabilizer code Fix(S) associated with S is given by Fix(S) = fv 2 Cq...

Nadella, Sushma

2012-07-16T23:59:59.000Z

204

45329 SCHEDULING POSTER.ai  

Broader source: Energy.gov (indexed) [DOE]

These courses have immediate open registraton These courses have immediate open registraton PLEASE LOOK FOR US AT http://energy.gov/dvu/professional-skills-and-technical-training OFFICE OF LEARNING & WORKFORCE DEVELOPMENT Professional Skills & Technical Training Program FY 2014 Corporate Schedule Points of Contact: If you have any logistical/registration questions please contact: Shira Kimble at 202-586-8449 or 301-903-5116. Course Title: Course Date: Time: CHRIS Code: Session: Location: Trustworthy Customer Services NEW January 15-16, 2014 8:30am-4:00pm 002452 0001 Forrestal RM GH- 043 CSRS Retirement Seminar January 28-30, 2014 8:30am-4:00pm 000033 0091 Forrestal RM GH- 043 Managing Up Down & Across February 11-12, 2014

205

Inspection/Sampling Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Inspection/Sampling Schedule Inspection/Sampling Schedule Inspection/Sampling Schedule Site Inspection and Water Sampling Schedules Note: The following schedules are subject to change without prior notice and will be updated periodically. Site Name Inspection Date Sampling Week Ambrosia Lake, NM, Disposal Site August 18, 2014 November 20, 2013 Bluewater, NM, Disposal Site August 18, 2014 November 20, 2013 January 28, 2014 May 12, 2014 Boiling Nuclear Superheater (BONUS), PR, Decommissioned Reactor Site Next event 2017 Burrell, PA, Disposal Site December 9, 2013 November 20, 2013 Canonsburg, PA, Disposal Site December 9, 2013 November 19, 2013 Durango, CO, Disposal Site May 19, 2014 June 2, 2014 Durango, CO, Processing Site N/A June 2, 2014 September 1, 2014 Edgemont, SD, Disposal Site June 23, 2014 N/A

206

EIA RECORDS SCHEDULE (EIARS) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIA RECORDS SCHEDULE (EIARS) EIA RECORDS SCHEDULE (EIARS) EIA RECORDS SCHEDULE (EIARS) The establishment of the Energy Information Administration (EIA) as an independent statistical agency within the U.S. Department of Energy in 1977 was a result of enabling legislation that charged the EIA to maintain a comprehensive data and information program relevant to energy resources and reserves, energy production, energy demand, energy technologies, and related financial and statistical information relevant to the adequacy of energy resources to meet the Nations demands in the near and longer term future EIA RECORDS SCHEDULE (EIARS) More Documents & Publications Request For Records Disposition ADMINISTRATIVE RECORDS SCHEDULE 17: CARTOGRAPHIC, AERIAL PHOTOGRAPHIC, ARCHITECTURAL, ENGINEERING, AND FACILITY MANAGEMENT RECORDS

207

Administrative Records Schedules | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Administrative Records Schedules Administrative Records Schedules Administrative Records Schedules Administrative Records Schedules NOTE: Most of the files below are in PDF, you will need Acrobat® Reader(tm) to view these files. SCHEDULE TITLE DATE LAST CHANGED AUTHORIZATION NUMBER 1 Personnel Records (pdf) 09/15/10 N1-434-98-4 2 Payroll & Pay Administration Records (pdf) 09/15/10 N1-434-98-5 3 Procurement, Supply, and Grant Records (pdf) 09/15/10 N1-434-98-6 N1-434-95-1 4 Property Disposal Records (pdf) 12/10/10 --- 5 Budget Preparation, Presentation and Apportionment Records (pdf) 12/10/10 N1-434-98-8 6 Accountable Officers' Accounts Records (pdf) 09/15/10 N1-434-98-9 7 Expenditure Accounting Records --- GRS 7 8 Stores, Plants and Cost Accounting Records --- GRS 8

208

Distributed and Networked Dynamic Resource Allocation, Scheduling, and Control Experiments  

E-Print Network [OSTI]

Distributed and Networked Dynamic Resource Allocation, Scheduling, and Control Experiments Nicanor into decentralized and networked dynamic resource allocation, scheduling, and control. 2 Questions 1. What, "Experiments for decentralized and networked dynamic resource allocation, scheduling, and control," Submitted

209

Enhancing feedback process scheduling via a predictive control approach  

E-Print Network [OSTI]

Enhancing feedback process scheduling via a predictive control approach Alessandro Vittorio the application possibilities at an affordable additional cost. Keywords: feedback scheduling; control that preemptive process schedulers in multitasking operating systems can be viewed, and above all designed

Como, Giacomo

210

Energy Efficiency Exchange 2015 Schedule | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Schedule Energy Efficiency Exchange 2015 Schedule The schedule for Energy Efficiency Exchange 2015 is available below. Monday, August 10, 2015 12 p.m.-5:30 p.m. Registration...

211

CTV-1-H Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

CTV-1-H Wholesale Power Rate Schedule CTV-1-H Wholesale Power Rate Schedule Area: Tennessee Valley Authority System: CU This rate schedule shall be available to the Tennessee...

212

CBR-1-H Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

CBR-1-H Wholesale Power Rate Schedule CBR-1-H Wholesale Power Rate Schedule Area: Big Rivers and Henderson, KY System: CU This rate schedule shall be available to Big Rivers...

213

Reflex ring laser amplifier system  

DOE Patents [OSTI]

The invention is a method and apparatus for providing a reflex ring laser system for amplifying an input laser pulse. The invention is particularly useful in laser fusion experiments where efficient production of high-energy and high power laser pulses is required. The invention comprises a large aperture laser amplifier in an unstable ring resonator which includes a combination spatial filter and beam expander having a magnification greater than unity. An input pulse is injected into the resonator, e.g., through an aperture in an input mirror. The injected pulse passes through the amplifier and spatial filter/expander components on each pass around the ring. The unstable resonator is designed to permit only a predetermined number of passes before the amplified pulse exits the resonator. On the first pass through the amplifier, the beam fills only a small central region of the gain medium. On each successive pass, the beam has been expanded to fill the next concentric non-overlapping region of the gain medium.

Summers, M.A.

1983-08-31T23:59:59.000Z

214

Wavelength-tunable optical ring resonators  

DOE Patents [OSTI]

Optical ring resonator devices are disclosed that can be used for optical filtering, modulation or switching, or for use as photodetectors or sensors. These devices can be formed as microdisk ring resonators, or as open-ring resonators with an optical waveguide having a width that varies adiabatically. Electrical and mechanical connections to the open-ring resonators are made near a maximum width of the optical waveguide to minimize losses and thereby provide a high resonator Q. The ring resonators can be tuned using an integral electrical heater, or an integral semiconductor junction.

Watts, Michael R. (Albuquerque, NM); Trotter, Douglas C. (Albuquerque, NM); Young, Ralph W. (Albuquerque, NM); Nielson, Gregory N. (Albuquerque, NM)

2009-11-10T23:59:59.000Z

215

Rings in central-force network dynamics  

Science Journals Connector (OSTI)

The central-force network dynamics model for glasses is extended to treat networks involving small regular rings of bonds. In particular, band-limit formulas are obtained for an A2X3 glass consisting of regular puckered six-membered A3X3 rings. The special case of planar rings is compared with observations on vitreous B2O3. This continuous random network of "boroxol" rings shows improved agreement with experiment over a model not containing rings. The remaining discrepancies illustrate the need to include noncentral forces in the network dynamics of v-B2O3.

F. L. Galeener and M. F. Thorpe

1983-11-15T23:59:59.000Z

216

Wavelength-tunable optical ring resonators  

DOE Patents [OSTI]

Optical ring resonator devices are disclosed that can be used for optical filtering, modulation or switching, or for use as photodetectors or sensors. These devices can be formed as microdisk ring resonators, or as open-ring resonators with an optical waveguide having a width that varies adiabatically. Electrical and mechanical connections to the open-ring resonators are made near a maximum width of the optical waveguide to minimize losses and thereby provide a high resonator Q. The ring resonators can be tuned using an integral electrical heater, or an integral semiconductor junction.

Watts, Michael R. (Albuquerque, NM); Trotter, Douglas C. (Albuquerque, NM); Young, Ralph W. (Albuquerque, NM); Nielson, Gregory N. (Albuquerque, NM)

2011-07-19T23:59:59.000Z

217

Approximate resolution of a resource-constrained scheduling problem  

E-Print Network [OSTI]

hard resource-constrained scheduling problem which arises in relation to .... schedules in which the temperature is allowed to increase. 5 ...... Systems & Control.

218

A Mathematical approach applied to train scheduling in Brazilian ...  

E-Print Network [OSTI]

Abstract In this paper, a mathematical approach was used to schedule trains in ... Nowadays, due this criticality, the main decision about the train schedule over.

2014-07-15T23:59:59.000Z

219

Parallel machine match-up scheduling with manufacturing cost considerations  

E-Print Network [OSTI]

approach for the single machine scheduling problem. Journaldecisions on parallel CNC machines: -constraint approach.mechanism for the CNC machine scheduling problems with

Aktrk, M. Selim; Atamtrk, Alper; Grel, Sinan

2010-01-01T23:59:59.000Z

220

CSI-1-H Wholesale Power Rate Schedule | Department of Energy  

Energy Savers [EERE]

Area: Southern Illinois System: CU This rate schedule shall be available to Southern Illinois Power Cooperative (hereinafter the Customer). This rate schedule shall be...

Note: This page contains sample records for the topic "ring status schedules" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES...  

Broader source: Energy.gov (indexed) [DOE]

3: RECORDS COMMON TO MOST OFFICES (Revision 2) ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES (Revision 2) This schedule provides for the disposal of certain...

222

ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS...  

Broader source: Energy.gov (indexed) [DOE]

1: SPACE AND MAINTENANCE RECORDS ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS This schedule provides for the disposal of all copies, wherever located in the...

223

ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES...  

Office of Environmental Management (EM)

23: RECORDS COMMON TO MOST OFFICES ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES This schedule covers those administrative management activities not covered by...

224

PROCEDURE FOR PREPARING RECORDS INVENTORY AND DISPOSITION SCHEDULES...  

Broader source: Energy.gov (indexed) [DOE]

PROCEDURE FOR PREPARING RECORDS INVENTORY AND DISPOSITION SCHEDULES (RIDS) PROCEDURE FOR PREPARING RECORDS INVENTORY AND DISPOSITION SCHEDULES (RIDS) This document lists the...

225

Rate Schedule CV-RFS4  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

RFS4 RFS4 (Supersedes Schedule CV-RFS3) UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT SCHEDULE OF RATE FOR REGULATION AND FREQUENCY RESPONSE SERVICE Effective: October 1, 2011, through September 30, 2016. Available: Within the marketing area served by the Western Area Power Administration (Western), Sierra Nevada Customer Service Region. Applicable: To customers receiving Regulation and Frequency Response Service (regulation). Character and Conditions of Service: Regulation is necessary to provide for the continuous balancing of resources and interchange with load and for maintaining scheduled interconnection frequency at 60-cycles per second. Formula Rate: The formula rate for regulation includes three components:

226

UCPath Project Status Report Report Date February 22, 2013 Project Director  

E-Print Network [OSTI]

1 UCPath Project Status Report Report Date February 22, 2013 Project Director Anthony Lo Anthony.Lo@ucop.edu Executive Sponsors Nathan Brostrom Peter Taylor Project Summary Scope Schedule Budget Resources for early March. The UCPath Center team is focused on development of internal operating procedures

Fainman, Yeshaiahu

227

Status Report, Department of Energy's Chronic Beryllium Disease Prevention  

Broader source: Energy.gov (indexed) [DOE]

Status Report, Department of Energy's Chronic Beryllium Disease Status Report, Department of Energy's Chronic Beryllium Disease Prevention Program - February 2006 Status Report, Department of Energy's Chronic Beryllium Disease Prevention Program - February 2006 February 2006 Report on Implementation of 10 CFR Part 850, Chronic Beryllium Disease Prevention Program During calendar year 2005, the Office of Independent Oversight, within the Office of Security and Safety Performance Assurance, evaluated the effectiveness of U.S. Department of Energy (DOE) chronic beryllium disease protection programs (CBDPPs) at five sites as part of regularly scheduled inspections. These reviews focused on site programs for ensuring that workers are protected in accordance with the requirements of 10 CFR 850. This report summarizes the observations, insights, and lessons learned from

228

Status Report, Department of Energy's Chronic Beryllium Disease Prevention  

Broader source: Energy.gov (indexed) [DOE]

Status Report, Department of Energy's Chronic Beryllium Disease Status Report, Department of Energy's Chronic Beryllium Disease Prevention Program - February 2006 Status Report, Department of Energy's Chronic Beryllium Disease Prevention Program - February 2006 February 2006 Report on Implementation of 10 CFR Part 850, Chronic Beryllium Disease Prevention Program During calendar year 2005, the Office of Independent Oversight, within the Office of Security and Safety Performance Assurance, evaluated the effectiveness of U.S. Department of Energy (DOE) chronic beryllium disease protection programs (CBDPPs) at five sites as part of regularly scheduled inspections. These reviews focused on site programs for ensuring that workers are protected in accordance with the requirements of 10 CFR 850. This report summarizes the observations, insights, and lessons learned from

229

CRYOGENIC AND VACUUM TECHNOLOGICAL ASPECTS OF THE LOW-ENERGY ELECTROSTATIC CRYOGENIC STORAGE RING  

SciTech Connect (OSTI)

The cryogenic and vacuum concepts for the electrostatic Cryogenic ion Storage Ring (CSR), under construction at the Max-Planck-Institut fuer Kernphysik in Heidelberg, is presented. The ring will operate in a broad temperature range from 2 to 300 K and is required to be bakeable up to 600 K. Extremely high vacuum and low temperatures are necessary to achieve long lifetimes of the molecular ions stored in the ring so that the ions will have enough time to cool by radiation to their vibrational and rotational ground states. To test cryogenic and vacuum technological aspects of the CSR, a prototype is being built and will be connected to the commercial cryogenic refrigerator recently installed, including a specialized 2-K connection system. The first results and the status of current work with the prototype are also presented.

Orlov, D. A.; Lange, M.; Froese, M.; Hahn, R. von; Grieser, M.; Mallinger, V.; Sieber, T.; Weber, T.; Wolf, A. [Max-Planck-Institut fuer Kernphysik, Heidelberg, 69029 Germany (Germany); Rappaport, M. [Weizmann Institute of Science, Rehovot 76100 (Israel)

2008-03-16T23:59:59.000Z

230

Definition: Scheduling Path | Open Energy Information  

Open Energy Info (EERE)

Scheduling Path Scheduling Path Jump to: navigation, search Dictionary.png Scheduling Path The Transmission Service arrangements reserved by the Purchasing-Selling Entity for a Transaction.[1] Related Terms transmission lines, Purchasing-Selling Entity, Transmission Service, transmission line References ↑ Glossary of Terms Used in Reliability Standards An inl LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ine Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Scheduling_Path&oldid=480301" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation:

231

Definition: Interchange Schedule | Open Energy Information  

Open Energy Info (EERE)

Schedule Schedule Jump to: navigation, search Dictionary.png Interchange Schedule An agreed-upon Interchange Transaction size (megawatts), start and end time, beginning and ending ramp times and rate, and type required for delivery and receipt of power and energy between the Source and Sink Balancing Authorities involved in the transaction.[1] Related Terms Interchange transaction References ↑ Glossary of Terms Used in Reliability Standards An LikeLike UnlikeLike You like this.Sign Up to see what your friends like. inline Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Interchange_Schedule&oldid=480572" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link

232

DOE HQ Shuttle Bus Route and Schedule  

Broader source: Energy.gov (indexed) [DOE]

Shuttle Bus Route and Schedule Shuttle Bus Route and Schedule The DOE Shuttle Buses follow the same schedules between the two main Headquarters locations, Forrestal and Germantown. The buses start their routes at each Headquarters facility at the same times, see the schedule below. The subsequent stops at the other facilities are relative to the departure time of each route. Headquarters employees are reminded of the statutory provisions that authorize and limit the use of the shuttle bus service. Specific authority for the use of appropriated funds to pay for transportation for official purposes is contained in section 1344(a)(1) of Title 31, U.S. Code. Use of this transportation for any other purpose is

233

Undergraduate Program Time Limits and Work Schedules  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Time Limits and Work Schedules Time Limits and Work Schedules Undergraduate Program Time Limits and Work Schedules Point your career towards LANL: work with the best minds on the planet in an inclusive environment that is rich in intellectual vitality and opportunities for growth. Contact Student Programs (505) 665-8899 Email Time limits The length of participation in the undergraduate program is limited to a maximum of six years for students pursuing a bachelor's degree and three years for students pursuing an associate's degree. Work schedules Year-round students Students participating in some special undergraduate programs, post-baccalaureate appointments, post-master's appointments, and GRA students working on a thesis or dissertation are excluded from the 30-hour per week work restriction.

234

Graduate Program Time Limits and Work Schedules  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Time Limits and Work Schedules Time Limits and Work Schedules Graduate Program Time Limits and Work Schedules Point your career towards LANL: work with the best minds on the planet in an inclusive environment that is rich in intellectual vitality and opportunities for growth. Contact Student Programs (505) 665-8899 Email Time Limits The length of participation in the graduate program is limited as follows: With a bachelor's pursuing a master's degree: 4 years With a bachelor's pursuing a PhD: 7 years With a master's pursuing a second master's degree: 2 years With a master's pursuing a PhD: 4 years With a master's pursuing a master's and PhD in a new field: 6 years Students may remain in the GRA program for up to three months after receiving their PhD. Work schedules Year-round students Students participating in the MBA program, post-baccalaureate appointments,

235

APCF Construction Schedule | Advanced Photon Source  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

APCF APCF Past APCF Memoranda APCF, Construction Schedule This is a tentative schedule of the daily construction at APCF. For the preliminary two to three week look ahead schedule, please click the PDF calendar to the left. The potential for ground vibration is noted in the "Impact" column (None, Small, Moderate, High, Very High). Daily schedule for dates up to 01.17.2014 Day Activity Impact Monday - 08.05.13 Studs and Drywall None Ceiling Piping None Curtain Wall None Site Grading Low Tuesday - 08.06.13 Studs and Drywall None Ceiling Piping None Curtain Wall None Landscaping Low Wednesday - 08.07.13 Studs and Drywall None Ceiling Piping None Curtain Wall None Landscaping Low Thursday - 08.08.13 Studs and Drywall None Ceiling Piping None Curtain Wall None

236

Batch Queues and Scheduling Policies on Edison  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Queues and Policies Queues and Scheduling Policies Users submit jobs to a submit queue and wait in line until nodes become available to run a job. NERSC's queue structures are...

237

Transportation resource scheduling in food retail industry  

E-Print Network [OSTI]

The objective of this thesis is to find an appropriate analytical method for scheduling the daily driver tasks in the grocery industry. The goal is to maximize driver utilization. A "Bin-packing" approach is employed to ...

Akkas, Arzum, 1978-

2004-01-01T23:59:59.000Z

238

Production Scheduling with Energy Efficiency Constraints  

E-Print Network [OSTI]

This research is motivated by a real world production scheduling problem in a continuous manufacturing system involving multiple objectives, multiple products and multiple processing lines with various inventory, production and energy efficiency...

Lee, J.; Kozman, T. A.; Wang, X.

2007-01-01T23:59:59.000Z

239

DOE Announces New WIPP Tour Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Announces New WIPP Tour Schedule CARLSBAD, N.M., March 14, 2001 - The U.S. Department of Energy's (DOE) Carlsbad Field Office today announced changes in the public tour program at...

240

Provably Efficient Adaptive Scheduling for Parallel Jobs  

E-Print Network [OSTI]

Scheduling competing jobs on multiprocessors has always been an important issue for parallel and distributed systems. The challenge is to ensure global, system-wide efficiency while offering a level of fairness to user ...

He, Yuxiong

Note: This page contains sample records for the topic "ring status schedules" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

PARS II Training Schedule | Department of Energy  

Office of Environmental Management (EM)

will certify that user to receive a PARS II user account. PARSIITrainingSchedule03-06-2014.pdf More Documents & Publications Slide 1 Slide 1 PARS II Course Registration Form...

242

Scheduling of Mobile Robots with Preemptive Tasks  

Science Journals Connector (OSTI)

This paper deals with the problem of scheduling of mobile robots taking into account preemption cases in a ... capability of transporting materials between some machines, mobile robots are able to perform manufac...

Izabela Nielsen; Quang-Vinh Dang

2014-01-01T23:59:59.000Z

243

Online optimization in routing and scheduling  

E-Print Network [OSTI]

In this thesis we study online optimization problems in routing and scheduling. An online problem is one where the problem instance is revealed incrementally. Decisions can (and sometimes must) be made before all information ...

Wagner, Michael R. (Michael Robert), 1978-

2006-01-01T23:59:59.000Z

244

WEBVIEWER INSTRUCTION PACKET Facilities Planning and Scheduling  

E-Print Network [OSTI]

-mail: scheduling@mail.wvu.edu Website: http://facilitiesscheduling.wvu.edu http://webviewer.wvu.edu #12;2 WebViewer: Detailed Instructions Table of Contents Purpose of WebViewer.................................................................................................................................3 Tour of Web

Mohaghegh, Shahab

245

Rate Schedule CV-EID4  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

EID4 EID4 (Supersedes Schedule CV-EID3) UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT SCHEDULE OF RATE FOR ENERGY IMBALANCE SERVICE Effective: October 1, 2011, through September 30, 2016. Available: Within the marketing area served by the Western Area Power Administration (Western), Sierra Nevada Customer Service Region. Applicable: To customers receiving Energy Imbalance (EI) service. Character and Conditions of Service: EI is provided when a difference occurs between the scheduled and the actual delivery of energy to a load within the Sub-Balancing Authority (SBA) over an hour or in accordance with approved policies and procedures. The deviation, in megawatts, is the net scheduled amount of

246

Project Schedule Optimization in a Telecommunications Environment  

E-Print Network [OSTI]

Veritas Corporation is a thriving company in the fast-paced telecommunications industry. To keep up with the dynamic industry, a significant quantity of projects must be scheduled in a short time period without impacting ...

Taliaferro, Chris

2013-12-20T23:59:59.000Z

247

Nuclear proliferation status report. Status report  

SciTech Connect (OSTI)

This report contains information concerning the nuclear proliferation status of the following countries: (1) Russia, (2) Ukraine, (3) Belarus, (4) Kazakhstan, (5) Israel, (6) India, (7) Pakistan, (8) South Africa, (9) North Korea, (10) Iraq, (11) Iran, (12) Lybia, (13) Algeria, (14) Syria, (15) Brazil, (16) Argentina, and (17) Taiwan.

NONE

1992-07-01T23:59:59.000Z

248

Cooling system for three hook ring segment  

DOE Patents [OSTI]

A triple hook ring segment including forward, midsection and aft mounting hooks for engagement with respective hangers formed on a ring segment carrier for supporting a ring segment panel, and defining a forward high pressure chamber and an aft low pressure chamber on opposing sides of the midsection mounting hook. An isolation plate is provided on the aft side of the midsection mounting hook to form an isolation chamber between the aft low pressure chamber and the ring segment panel. High pressure air is supplied to the forward chamber and flows to the isolation chamber through crossover passages in the midsection hook. The isolation chamber provides convection cooling air to an aft portion of the ring segment panel and enables a reduction of air pressure in the aft low pressure chamber to reduce leakage flow of cooling air from the ring segment.

Campbell, Christian X.; Eng, Darryl; Lee, Ching-Pang; Patat, Harry

2014-08-26T23:59:59.000Z

249

Knowledge-Based Design of Scheduling Systems Jrgen Sauer  

E-Print Network [OSTI]

have to decide and control within the scheduling process. In different application areas scheduling1 Knowledge-Based Design of Scheduling Systems Jürgen Sauer Universität Oldenburg, FB Informatik Escherweg 2 D-26121 Oldenburg, Germany sauer@informatik.uni-oldenburg.de Abstract A Scheduling system shall

Appelrath, Hans-Jürgen

250

Survey of Gain-Scheduling Analysis & Design WE.Leithead  

E-Print Network [OSTI]

ranging from aerospace to process control. Despite the wide application of gain-scheduling controllers of gain-scheduling controllers and a diverse academic literature relating to gain- scheduling extendingSurvey of Gain-Scheduling Analysis & Design D.J.Leith WE.Leithead Department of Electronic

Duffy, Ken

251

Rate of Growth of Fungus Rings  

Science Journals Connector (OSTI)

... MR. O. G. S. CRAWFORD'S letter in NATURE of December 26, page 938, concerning the age of fairy rings, seems to warrant a letter ...

J. RAMSBOTTOM

1926-01-30T23:59:59.000Z

252

Condenser for illuminating a ring field  

DOE Patents [OSTI]

A series of segments of a parent aspheric mirror having one foci at at a si-point source of radiation and the other foci at the radius of a ring field have all but one or all of their beams translated and rotated by sets of mirrors such that all of the beams pass through the real entrance pupil of a ring field camera about one of the beams and fall onto the ring field radius as a coincident image as an arc of the ring field.

Sweatt, William C. (Albuquerque, NM)

1994-01-01T23:59:59.000Z

253

Condenser for illuminating a ring field  

DOE Patents [OSTI]

A series of segments of a parent aspheric mirror having one foci at a point source of radiation and the other foci at the radius of a ring field have all but one or all of their beams translated and rotated by sets of mirrors such that all of the beams pass through the real entrance pupil of a ring field camera about one of the beams and fall onto the ring field radius as a coincident image as an arc of the ring field. 5 figs.

Sweatt, W.C.

1994-11-01T23:59:59.000Z

254

Concentric ring flywheel with hooked ring carbon fiber separator/torque coupler  

DOE Patents [OSTI]

A concentric ring flywheel with expandable separators, which function as torque couplers, between the rings to take up the gap formed between adjacent rings due to differential expansion between different radius rings during rotation of the flywheel. The expandable separators or torque couplers include a hook-like section at an upper end which is positioned over an inner ring and a shelf-like or flange section at a lower end onto which the next adjacent outer ring is positioned. As the concentric rings are rotated the gap formed by the differential expansion there between is partially taken up by the expandable separators or torque couplers to maintain torque and centering attachment of the concentric rings.

Kuklo, Thomas C. (Oakdale, CA)

1999-01-01T23:59:59.000Z

255

Annual Hanford Site Environmental Permitting status report  

SciTech Connect (OSTI)

The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. Condition II.W further specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of this Permit Condition, ''best efforts'' mean submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies.

SONNICHSEN, J.C.

1999-10-18T23:59:59.000Z

256

Predicting construction cost and schedule success using artificial neural networks ensemble and support vector machines classification models  

Science Journals Connector (OSTI)

It is commonly perceived that how well the planning is performed during the early stage will have significant impact on final project outcome. This paper outlines the development of artificial neural networks ensemble and support vector machines classification models to predict project cost and schedule success, using status of early planning as the model inputs. Through industry survey, early planning and project performance information from a total of 92 building projects is collected. The results show that early planning status can be effectively used to predict project success and the proposed artificial intelligence models produce satisfactory prediction results.

Yu-Ren Wang; Chung-Ying Yu; Hsun-Hsi Chan

2012-01-01T23:59:59.000Z

257

Steam in the Ring Discharge  

Science Journals Connector (OSTI)

The behaviour of steam and its decomposition products in the ring discharge has been examined. Dry hydrogen is not dissociated. The production of atomic hydrogen is dependent upon the presence of steam which dissociates into hydroxyl and atomic hydrogen. A secondary source of atomic hydrogen is then afforded by the interaction of hydroxyl with molecular hydrogen. The escape from the discharge of atomic hydrogen, a long-lived species, favours the dissociation of steam. Mercury vapour, on the other hand, inhibits the formation of atomic hydrogen and thus leads to a high equilibrium steam concentration. Unlike dry hydrogen, dry oxygen is dissociated into atoms, but these have a short life as such and recombine in the discharge to form molecular oxygen and ozone. The reaction mechanisms occurring in the discharge are discussed in the light of spectrographic results.

G I Finch

1949-01-01T23:59:59.000Z

258

On rings of structural numbers  

E-Print Network [OSTI]

structural numbers over the set X, and let B(X) have the operations defined above with equality also as before. Theorem I. l. If X is any set, then B(X) is a commutative ring with identity. Proof. The structural number 0 is the additive identity element... with identity g. Definition I. 7. If A, B e S(X) then A'B = (P U q ( p e A, q e B, p Il q = &f and p U q can be formed in an odd number of ways). ~E1 t. 4. L t A = (( . b), (bj. 7 )) 4 B = ((b, c), (b), (a)) be in S(X) for some X. Then AD B = {{b, a), {a...

Powell, Wayne Bruce

2012-06-07T23:59:59.000Z

259

US RERTR Program: overview, status and plans  

SciTech Connect (OSTI)

The status of the Reduced Enrichment Research and Test Reactor (RERTR) Program is reviewed. After a brief review of the accomplishments which the RERTR Program, in cooperation with its many international partners, had achieved by the end of 1983 in the area of LEU research reactor fuels development and application, emphasis is placed on the RERTR Program developments which took place during 1984 and on current plans and schedules. The RERTR progress in 1984 has been significant, with solid accomplishments and few surprises. Most LEU U/sub 3/Si/sub 2/-Al irradiation tests with 4.8 g U/cm/sup 3/ have been successfully completed, and contract negotiations are under way for the procurement of a whole-core demonstration of this fuel in the ORR. The demonstration is to begin in mid-1985 and to last for approximately eighteen months. Qualification of U/sub 3/Si/sub 2/-Al fuel with 7 g U/cm/sup 3/ is scheduled for 1989. International cooperation among fuel developers, commercial vendors, and reactor operators has been essential to the progress which has been achieved. With continued international cooperation, it will be feasible to significantly reduce HEU usage in research reactors in the next few years.

Travelli, A.

1984-01-01T23:59:59.000Z

260

FILM AND VIDEO COLLECTION SCHEDULING REQUEST Date: Send To: Video Scheduling  

E-Print Network [OSTI]

FILM AND VIDEO COLLECTION SCHEDULING REQUEST Date: Requestor: Send To: Video Scheduling Film and Video Collection Department University of Delaware Library (302) 831-8419 FAX (302) 831-6197 Media within seven days, please check out media at the Film and Video Collection Department Service Desk

Cakoni, Fioralba

Note: This page contains sample records for the topic "ring status schedules" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

REGULATORY STATUS: AOC  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

184 UNIT NAME: Concrete Rubble pile 129) REGULATORY STATUS: AOC LOCATION: Outside plant security south of C-611 Water Treatment Plant. Estimated to be less than 5 cubic feet....

262

Status of Solar Photovoltaics  

Science Journals Connector (OSTI)

Before our discussions on the technical aspects of solar photovoltaics, we will first review the status of solar photovoltaics. This chapter begins with a review on ... known barrier to large-scale deployment of ...

Meng Tao

2014-01-01T23:59:59.000Z

263

Reducing Pausing at Rich-to-Lean Schedule Transitions: Effects of Variable-Ratio Schedules and Noncontingent Timeouts  

E-Print Network [OSTI]

-schedule component), which may maintain responding in the lean component when there is insufficient reinforcement. 4 General Introduction The Basic Problem: Pausing on FR Schedules Fixed-ratio (FR) schedules require that a certain number of responses occur.... In the context of a FR schedule, pausing may be considered counterproductive (or maladaptive) because it postpones the receipt of a reinforcer for a food-deprived organism. A host of variables affect pausing on FR schedules; for example, pausing increases as a...

Brewer, Adam Thornton

2012-08-31T23:59:59.000Z

264

Bernstein instability driven by thermal ring distribution  

SciTech Connect (OSTI)

The classic Bernstein waves may be intimately related to banded emissions detected in laboratory plasmas, terrestrial, and other planetary magnetospheres. However, the customary discussion of the Bernstein wave is based upon isotropic thermal velocity distribution function. In order to understand how such waves can be excited, one needs an emission mechanism, i.e., an instability. In non-relativistic collision-less plasmas, the only known Bernstein wave instability is that associated with a cold perpendicular velocity ring distribution function. However, cold ring distribution is highly idealized. The present Brief Communication generalizes the cold ring distribution model to include thermal spread, so that the Bernstein-ring instability is described by a more realistic electron distribution function, with which the stabilization by thermal spread associated with the ring distribution is demonstrated. The present findings imply that the excitation of Bernstein waves requires a sufficiently high perpendicular velocity gradient associated with the electron distribution function.

Yoon, Peter H., E-mail: yoonp@umd.edu [Institute for Physical Science and Technology, University of Maryland, College Park, Maryland 20742 (United States); School of Space Research, Kyung Hee University, Yongin-Si, Gyeonggi-Do 446-701 (Korea, Republic of); Hadi, Fazal; Qamar, Anisa [Institute of Physics and Electronics, University of Peshawar, Peshawar 25000 (Pakistan)

2014-07-15T23:59:59.000Z

265

EM Quality Assurance Assessment Schedule FY 2010  

Broader source: Energy.gov (indexed) [DOE]

DR. STFDlN L. KRAHN DR. STFDlN L. KRAHN DEPUTY ASSlS SAFETY ENVIRONhtENTAL MANAGEMENT SUBJECT: U p d a t e d F i Year 2010 Environmental Mmagemmt Quality Assurance Assessment Schedule AWhed for planuing and coordination purposes is t h e updated Ql&ty Amtrance {OA) asesmmt schedule for the remainder of fiscal year $Y) 2010. . - , The schedule is organized per the various types of QA asmmum@ that will k led by the Office of S t a n e and Quality Assurance (EM-23) or the Field elements. Please provide your feedbadc on the suggested self-atxwssment dates by Monday, Apd 12,2010 (item 2, below). Tht scope a n d tim'mg of plaoned asseasments are designed to be relevant, timely, and & I value to enhaace QA performame of specific projects. EM-23 has developed the attached oversight prioritization methodology plan that takes into

266

Rate Schedule CV-NWT5  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NWT5 NWT5 (Supersedes Schedule CV-NWT4) UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT SCHEDULE OF RATE FOR NETWORK INTEGRATION TRANSMISSION SERVICE Effective: October 1, 2011, through September 30, 2016. Available: Within the marketing area served by the Western Area Power Administration (Western), Sierra Nevada Customer Service Region. Applicable: To customers receiving Central Valley Project (CVP) Network Integration Transmission Service (NITS). Character and Conditions of Service: Transmission service for three-phase, alternating current at 60-hertz, delivered and metered at the voltages and points of delivery or receipt, adjusted for losses, and delivered to points of delivery. This service includes scheduling and system control and dispatch service needed to

267

Scheduling and allocation algorithm for an elliptic filter  

E-Print Network [OSTI]

A new evolutionary algorithm for scheduling and allocation algorithm is developed for an elliptic filter. The elliptic filter is scheduled and allocated in the proposed work which is then compared with the different scheduling algorithms like As Soon As Possible algorithm, As Late As Possible algorithm, Mobility Based Shift algorithm, FDLS, FDS and MOGS. In this paper execution time and resource utilization is calculated using different scheduling algorithm for an Elliptic Filter and reported that proposed Scheduling and Allocation increases the speed of operation by reducing the control step. The proposed work to analyse the magnitude, phase and noise responses for different scheduling algorithm in an elliptic filter.

Marikkannan, Sangeetha

2012-01-01T23:59:59.000Z

268

On dynamic scheduling of a parallel server system with certain graph structure  

E-Print Network [OSTI]

Primitives 2.3 Scheduling Control . Chapter 3 Sequence ofto be mutually independent. Scheduling Control The system isand service rates and scheduling control are allowed to vary

Pesic, Vladimir N.

2011-01-01T23:59:59.000Z

269

An Online Scheduling Algorithm with Advance Reservation for Large-Scale Data Transfers  

E-Print Network [OSTI]

Flow scheduling and endpoint rate control in gridnetworks.granularity and ?ner control in scheduling with a cost ofMukherjee. Control plane for advance bandwidth scheduling in

Balman, Mehmet

2012-01-01T23:59:59.000Z

270

Space-Time Power Scheduling of MIMO LinksFairness and QoS Considerations  

E-Print Network [OSTI]

design of link scheduling and power control. This would be aPower control, beamforming and link scheduling are alllink scheduling (temporal freedom) with MIMO power control (

Rong, Yue; Hua, Yingbo

2008-01-01T23:59:59.000Z

271

Energy Consumption Scheduling in Smart Grid: A Non-Cooperative Game Approach  

E-Print Network [OSTI]

on Game- Theoretic Energy Consumption Scheduling for theIn this paper, energy consumption scheduling based on non-Energy Consumption Scheduling in Smart Grid: A Non-

Ma, Kai; Hu, Guoqiang; Spanos, Costas J

2014-01-01T23:59:59.000Z

272

Molecular Model of the Contractile Ring  

E-Print Network [OSTI]

We present a model for the actin contractile ring of adherent animal cells. The model suggests that the actin concentration within the ring and consequently the power that the ring exerts both increase during contraction. We demonstrate the crucial role of actin polymerization and depolymerization throughout cytokinesis, and the dominance of viscous dissipation in the dynamics. The physical origin of two phases in cytokinesis dynamics ("biphasic cytokinesis") follows from a limitation on the actin density. The model is consistent with a wide range of measurements of the midzone of dividing animal cells.

D. Biron; E. Alvarez-Lacalle; Tsvi Tlusty; Elisha Moses

2010-08-05T23:59:59.000Z

273

Disposition of excess highly enriched uranium status and update  

SciTech Connect (OSTI)

This paper presents the status of the US DOE program charged with the disposition of excess highly enriched uranium (HEU). Approximately 174 metric tonnes of HEU, with varying assays above 20 percent, has been declared excess from US nuclear weapons. A progress report on the identification and characterization of specific batches of excess HEU is provided, and plans for processing it into commercial nuclear fuel or low-level radioactive waste are described. The resultant quantities of low enriched fuel material expected from processing are given, as well as the estimated schedule for introducing the material into the commercial reactor fuel market. 2 figs., 3 tabs.

Williams, C.K. III; Arbital, J.G.

1997-09-01T23:59:59.000Z

274

SUMMARY ON TITANIUM NITRIDE COATING OF SNS RING VACUUM CHAMBERS.  

SciTech Connect (OSTI)

The inner surfaces of the 248 m Spallation Neutron Source (SNS) accumulator ring vacuum chambers are coated with {approx}100nm of titanium nitride (TiN) to reduce the secondary electron yield (SEY) of the chamber walls. There are approximately 135 chambers and kicker modules, some up to 5m in length and 36cm in diameter, coated with TiN. The coating is deposited by means of reactive DC magnetron sputtering -using a - cylindrical cathode with internal permanent magnets. This cathode configuration generates a deposition-rate sufficient to meet the required production schedule and produces stoichiometric films with good adhesion, low SEY and acceptable outgassing. Moreover, the cathode magnet configuration allows for simple changes in length and has been adapted to coat the wide variety of chambers and components contained within the arcs, injection, extraction, collimation and RF straight sections. Chamber types and quantities as well as the cathode configurations are presented herein. The unique coating requirements of the injection kicker ceramic chambers and the extraction kicker ferrite surface will be emphasized. A brief summary of the salient coating properties is given including the interdependence of SEY as a function of surface roughness and its effect on outgassing.

TODD, R.; HE, P.; HSEUH, H.C.; WEISS, D.

2005-05-16T23:59:59.000Z

275

Crosswalk between DOERS and Admin Schedules  

Broader source: Energy.gov (indexed) [DOE]

2/00 2/00 Cross-Walk -DOERS to Admin Sched rev2.wpd DOERS Records Schedule Cross Index to DOE Administrative Records Disposition Schedules DOERS Item Number Description of Records DOE Administrative or Programmatic Schedule Number / Item NARA Case Number DOERS 1, Medical, Health and Safety Records DOERS 1, Item 1a Safety Management Records DOE Admin18, Item 11.1a, NC-326-75-2 DOERS 1, item 1 (b, c, d, & e) Safety Management Records DOE Admin 18, item 11.1 (c, d, e & f) II NNA-1023(2) II NNA-310(6) II NNA-1023(3) II NNA-409(25) DOERS 1, Item 2 Fire Unit Records DOE Admin18 ,Item 11.4 (a thru g) NC-430-76-2(3) II NNA-1858(1B) II NNA-2939 II NNA-1858(1C) II NNA-1858(E) II NNA-1858(1F) DOERS 1, Item 3 Medical or Health Research Project Case Files R & D Programmatic Schedule

276

Scheduling with Advanced Process Control Constraints  

E-Print Network [OSTI]

companies have to pay great attention to lower their produc- tion costs and guarantee high quality machine parameters so as to achieve satisfactory product quality. When there is a conflict between quality and scheduling ob- jectives, quality usually has to be satisfied. This paper studies the interaction between

Hasenbein, John

277

Hanford Treats Groundwater Ahead of Schedule  

Broader source: Energy.gov [DOE]

RICHLAND, Wash. EMs Richland Operations Office and contractor CH2M HILL Plateau Remediation Company (CH2M HILL) are ahead of schedule in meeting EM's annual goals for treating contaminated groundwater at the Hanford site in southeast Washington state.

278

Energy Conscious Scheduling Johnatan E. Pecero  

E-Print Network [OSTI]

Energy Conscious Scheduling Johnatan E. Pecero University of Luxembourg January 18, 2012 Green Days of Luxembourg Friday, January 20, 2012 #12;Johnatan E. Pecero Green Approaches · Hardware approach ­ Energy, microsoft) 9 Friday, January 20, 2012 #12;Johnatan E. Pecero Green Approaches · Hardware approach ­ Energy

Lefèvre, Laurent

279

Advance Resource Provisioning in Bulk Data Scheduling  

SciTech Connect (OSTI)

Today?s scientific and business applications generate mas- sive data sets that need to be transferred to remote sites for sharing, processing, and long term storage. Because of increasing data volumes and enhancement in current net- work technology that provide on-demand high-speed data access between collaborating institutions, data handling and scheduling problems have reached a new scale. In this paper, we present a new data scheduling model with ad- vance resource provisioning, in which data movement operations are defined with earliest start and latest comple- tion times. We analyze time-dependent resource assign- ment problem, and propose a new methodology to improve the current systems by allowing researchers and higher-level meta-schedulers to use data-placement as-a-service, so they can plan ahead and submit transfer requests in advance. In general, scheduling with time and resource conflicts is NP-hard. We introduce an efficient algorithm to organize multiple requests on the fly, while satisfying users? time and resource constraints. We successfully tested our algorithm in a simple benchmark simulator that we have developed, and demonstrated its performance with initial test results.

Balman, Mehmet

2012-10-01T23:59:59.000Z

280

ALA-1-N Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

ALA-1-N Wholesale Power Rate Schedule ALA-1-N Wholesale Power Rate Schedule ALA-1-N Wholesale Power Rate Schedule Area: PowerSouth Energy Cooperative System: Georgia-Alabama-South Carolina This rate schedule shall be available to the PowerSouth Energy Cooperative. This rate schedule shall be applicable to power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters, and Richard B. Russell Projects and sold under contract between the Cooperative and the Government. This rate schedule does not apply to energy from pumping operations at the Carters and Richard B. Russell Projects. Document Available for Download ALA-1-N Rate Schedule More Documents & Publications MISS-1-N Wholesale Power Rate Schedule

Note: This page contains sample records for the topic "ring status schedules" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

CM-1-H Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

CM-1-H Wholesale Power Rate Schedule CM-1-H Wholesale Power Rate Schedule CM-1-H Wholesale Power Rate Schedule Area: MEAM, MDEA, and SMEPA System: CU This rate schedule shall be available to the South Mississippi Electric Power Association, Municipal Energy Agency of Mississippi, and Mississippi Delta Energy Agency. This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereinafter called collectively the "Cumberland Projects") and sold in wholesale quantities. Document Available for Download CM-1-H Rate Schedule More Documents & Publications CEK-1-H Wholesale Power Rate Schedule CSI-1-H Wholesale Power Rate Schedule

282

CM-1-H Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

CM-1-H Wholesale Power Rate Schedule CM-1-H Wholesale Power Rate Schedule CM-1-H Wholesale Power Rate Schedule Area: MEAM, MDEA, and SMEPA System: CU This rate schedule shall be available to the South Mississippi Electric Power Association, Municipal Energy Agency of Mississippi, and Mississippi Delta Energy Agency. This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereinafter called collectively the "Cumberland Projects") and sold in wholesale quantities. Document Available for Download CM-1-H Rate Schedule More Documents & Publications CEK-1-H Wholesale Power Rate Schedule CSI-1-H Wholesale Power Rate Schedule

283

Gain Scheduled Control Using the Dual Youla Parameterization  

E-Print Network [OSTI]

Stability is a critical issue in gain-scheduled control problems in that the closed loop system may not be stable during the transitions between operating conditions despite guarantees that the gain-scheduled controller stabilizes the plant model...

Chang, Young Joon

2011-08-08T23:59:59.000Z

284

Weapon Scheduling Method for Cooperative Air-Defense Operation  

Science Journals Connector (OSTI)

By defining the weapon scheduling plan and weapon combat action, the mathematical formulation of weapon scheduling problem for cooperative air-defense operation ... the basis of discussing the primary constraints...

Liang Yu; Changfeng Xing

2012-01-01T23:59:59.000Z

285

A Modified Energy Saving Scheduling Algorithm on Heterogeneous Systems  

Science Journals Connector (OSTI)

Efficient application scheduling with low energy consumption is critical for achieving high performance ... a new schedule scheme which concentrates on the energy consumption of supply voltages varying and a mod...

An Shen; Yuming Xu

2014-01-01T23:59:59.000Z

286

University at Buffalo (SUNY) Department of Industrial Engineering Scheduling Theory  

E-Print Network [OSTI]

University at Buffalo (SUNY) Department of Industrial Engineering IE 661 Scheduling Theory Chapter 1 Rakesh Nagi Department of Industrial Engineering University at Buffalo (SUNY) #12;University at Buffalo (SUNY) Department of Industrial Engineering Chapter 1: Introduction Role of Scheduling Allocation

Nagi, Rakesh

287

Y-12 Finishes Initial HEUMF Loading Ahead of Schedule | National...  

National Nuclear Security Administration (NNSA)

Production Office NPO News Releases Y-12 Finishes Initial HEUMF Loading Ahead of Schedule Y-12 Finishes Initial HEUMF Loading Ahead of Schedule applicationmsword icon NR-01-10...

288

Impact of User Mobility and Asymmetry on Multiuser Scheduler Performance  

E-Print Network [OSTI]

Impact of User Mobility and Asymmetry on Multiuser Scheduler Performance Pengcheng Zhan, Ramesh throughput for fairness across UTs by scheduling the UTs based on the instantaneous channel Pengcheng Zhan

Swindlehurst, A. Lee

289

The positron accumulator ring for the APS  

SciTech Connect (OSTI)

The Positron Accumulator Ring (PAR) is designed to accumulate and damp positrons from the 450-MeV linac during the 0.5-s cycle time of the injector synchrotron for the APS 7-GeV storage ring. During 0.4 s of each synchrotron cycle, up to 24 linac pulses are injected into the horizontal phase space of the PAR at a 60-Hz rate. Each injected pulse occupies about 1.3 of the circumference of the accumulator ring. After 0.1 s for longitudinal damping, the single accumulated bunch is transferred to one of the 353-MHz buckets of the injector synchrotron RF system. The bunch is accelerated to 7 GeV and transferred to the storage ring, while the PAR accumulates the next bunch of positrons. 2 refs., 3 figs., 2 tabs.

Crosbie, E.A.

1989-01-01T23:59:59.000Z

290

RingCentral Mailboxes | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Description RingCentral Mailboxes Responsible Contacts Bruce Murray HR Policy Advisor E-mail bruce.murray@hq.doe.gov Phone 202-586-3372 More Documents & Publications...

291

The MAX IV storage ring project  

Science Journals Connector (OSTI)

The design of the MAX IV 3 GeV ultralow-emittance storage ring is presented and the implementation of solutions to the technological challenges imposed by the compact multi-bend achromat lattice are described.

Tavares, P.F.

2014-08-27T23:59:59.000Z

292

Optimal vortex rings and aquatic propulsion mechanisms  

Science Journals Connector (OSTI)

...vortex rings and aquatic propulsion mechanisms P. F. Linden...fluid mechanics behind these propulsion mechanisms and show that...over the cycle. 4. FISH PROPULSION BY UNDULATORY SWIMMING Most marine organisms have only discrete...

2004-01-01T23:59:59.000Z

293

Storage rings for spin-polarized hydrogen  

Science Journals Connector (OSTI)

A strong-focusing storage ring is proposed for the long-term magnetic confinement of a collisional gas of neutral spin-polarized hydrogen atoms in the |a? and |b? hyperfine states. The...

Thompson, D; Lovelace, R V E; Lee, D M

1989-01-01T23:59:59.000Z

294

Low thermal expansion seal ring support  

DOE Patents [OSTI]

Today, the trend is to increase the temperature of operation of gas turbine engines. To cool the components with compressor discharge air, robs air which could otherwise be used for combustion and creates a less efficient gas turbine engine. The present low thermal expansion sealing ring support system reduces the quantity of cooling air required while maintaining life and longevity of the components. Additionally, the low thermal expansion sealing ring reduces the clearance "C","C'" demanded between the interface between the sealing surface and the tip of the plurality of turbine blades. The sealing ring is supported by a plurality of support members in a manner in which the sealing ring and the plurality of support members independently expand and contract relative to each other and to other gas turbine engine components.

Dewis, David W. (San Diego, CA); Glezer, Boris (Del Mar, CA)

2000-01-01T23:59:59.000Z

295

Power Ring LLC | Open Energy Information  

Open Energy Info (EERE)

Ring LLC Ring LLC Jump to: navigation, search Name Power Ring LLC Place Goleta, California Zip 93117 Product Power Ring is a power storage technology developer working on technology developed by parent firm LaunchPoint Technologies. Coordinates 34.435682°, -119.824105° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":34.435682,"lon":-119.824105,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

296

Optimal investment and scheduling of distributed energy resources with uncertainty in electric vehicles driving schedules  

SciTech Connect (OSTI)

The large scale penetration of electric vehicles (EVs) will introduce technical challenges to the distribution grid, but also carries the potential for vehicle-to-grid services. Namely, if available in large enough numbers, EVs can be used as a distributed energy resource (DER) and their presence can influence optimal DER investment and scheduling decisions in microgrids. In this work, a novel EV fleet aggregator model is introduced in a stochastic formulation of DER-CAM [1], an optimization tool used to address DER investment and scheduling problems. This is used to assess the impact of EV interconnections on optimal DER solutions considering uncertainty in EV driving schedules. Optimization results indicate that EVs can have a significant impact on DER investments, particularly if considering short payback periods. Furthermore, results suggest that uncertainty in driving schedules carries little significance to total energy costs, which is corroborated by results obtained using the stochastic formulation of the problem.

Center for Energy and Innovative Technologies; NEC Laboratories America Inc.; Cardoso, Goncalo; Stadler, Michael; Bozchalui, Mohammed C.; Sharma, Ratnesh; Marnay, Chris; Barbosa-Povoa, Ana; Ferrao, Paulo

2013-10-27T23:59:59.000Z

297

TRU Waste Management Program. Cost/schedule optimization analysis  

SciTech Connect (OSTI)

This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.

Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.; Hastings, G.A.

1985-10-01T23:59:59.000Z

298

ESPC Task Order Schedules and Placement of Pricing Information  

Broader source: Energy.gov [DOE]

Document provides task order (TO) schedule descriptions and information on the placement of pricing for energy savings performance contracts (ESPCs).

299

Dynamic Multilevel Hybrid Scheduling Algorithms for Grid Computing  

Science Journals Connector (OSTI)

A Grid is an infrastructure for resource sharing. It is used for large-scale data processing, many of the applications being scientific ones. Grid scheduling is a vital component of a Grid infrastructure. Reliability, efficiency (in terms of time consumption) and effectiveness in resource utilization are the desired characteristics of Grid scheduling systems. Many algorithms have been developed for Grid scheduling. In our previous work, we proposed two scheduling algorithms (the Multilevel Hybrid Scheduling Algorithm and the Multilevel Dual Queue Scheduling Algorithm) for optimum utilization of processors in a Grid computing environment. In this paper, we propose two more flavours of Multilevel Hybrid scheduling algorithms; i.e. the Dynamic Multilevel Hybrid Scheduling Algorithm using Median and the Dynamic Multilevel Hybrid Scheduling Algorithm using Square root. We evaluate our proposed Grid scheduling using real workload traces, taken from leading computational centers. The main idea of the proposed algorithms is to execute jobs optimally, i.e. with minimum average waiting, turnaround and response times. An extensive performance comparison is presented using real workload traces to evaluate the efficiency of scheduling algorithms. To facilitate the research, a software tool has been developed which produces a comprehensive simulation of a number of Grid scheduling algorithms. The tool's output is in the form of scheduling performance metrics. The experimental results, based on performance metrics, demonstrate that the performances of our Grid scheduling algorithms give good results. Our proposed scheduling algorithms also support true scalability, that is, they maintain an efficient approach when increasing the number of processors or nodes. This paper also includes a statistical analysis of real workload traces to present the nature and behavior of jobs. Our proposed scheduling algorithms are unique. They have three key features. First, they favor the shortest job for execution. Second, they execute the job on the basis of a dynamic time quantum, to fairly distribute processor time among Grid jobs. A third feature is that they always execute the longest job, thus avoiding starvation.

Syed Nasir Mehmood Shah; Ahmad Kamil Bin Mahmood; Alan Oxley

2011-01-01T23:59:59.000Z

300

5 - Load Balance Scheduling for Cloud Data Centers  

Science Journals Connector (OSTI)

This chapter introduces online load balance scheduling for Cloud data centers. One of the challenging scheduling problems in Cloud data centers is the allocation and migration of reconfigurable virtual machines and integrated features of hosting physical machines. We first propose an online resource scheduling algorithm (OLRSA), which considers real-time and multidimensional resource scheduling. Besides OLRSA, a Lowest Integrated-load First Algorithm (LIF) is also introduced. Performance evaluation of both algorithms against other existing algorithms is provided by simulation.

Wenhong Tian; Yong Zhao

2015-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "ring status schedules" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Order Acceptance and Scheduling Problem in Two-machine Flow ...  

E-Print Network [OSTI]

Jul 29, 2014 ... Order Acceptance and Scheduling Problem in Two-machine Flow Shops: New Mixed Integer Programming Formulations.

Rasul Esmaeilbeigi

2014-07-29T23:59:59.000Z

302

Efficient Scheduling and Grant Sizing Methods for WDM PONs  

Science Journals Connector (OSTI)

Bandwidth allocation and transmission grant scheduling are problems of particular interest to multichannel passive optical networks (PONs). While ...

Kiaei, Mohammad S; Meng, Lehan; Assi, Chadi; Maier, Martin

2010-01-01T23:59:59.000Z

303

Hybrid Time Formulation for Diesel Blending and Distribution Scheduling  

Science Journals Connector (OSTI)

Hybrid Time Formulation for Diesel Blending and Distribution Scheduling ... Schematic of diesel in-line blending and distribution infrastructure. ...

Srgio M. S. Neiro; Valria V. Murata; Jos M. Pinto

2014-06-13T23:59:59.000Z

304

The endomorphism near ring on D?  

E-Print Network [OSTI]

THE FNDOMORPHISM NEAR RING ON Dg A Thesis by Fdgar Raymond Guthrie Submitted to the Graduate College of Texas A&M University in partial fulfillment of the requirements for the degree of MASTFR OF SCIENCE ~A 1969 (Month) (Year) Major... Subject: Mathematics THE ENDOMORPHISM NEAR RING ON Dg A Thesis by Edgar Raymond Guthrie Approved as to style and content by: (Cha' of Committee) (YAead of Department) (Member) (Member) (Member) (Member) ~AA 1969 (Month) (Year) ABSTRACT...

Guthrie, Edgar Raymond

1969-01-01T23:59:59.000Z

305

Using a SAT-solver to schedule sports leagues  

Science Journals Connector (OSTI)

Tournament schedules of sports leagues have to satisfy several types of constraints such as stadium unavailability, fixed matches, forbidden matches, minimum number of breaks. Usually, there is no schedule satisfying all given constraints and, hence, ... Keywords: Propositional satisfiability, Round robin tournaments, Soft constraints, Sports, Sports league scheduling, Timetabling

Andrei Horbach; Thomas Bartsch; Dirk Briskorn

2012-02-01T23:59:59.000Z

306

Design and Evaluation of a Feedback Control EDF Scheduling Algorithm *  

E-Print Network [OSTI]

Design and Evaluation of a Feedback Control EDF Scheduling Algorithm * * Supported in part by NSF. In this paper, we present a feedback control real­time scheduling algorithm and its evaluation. Performance}@cs.virginia.edu, + gt9s@virginia.edu Abstract Despite the significant body of results in real­time scheduling, many real

Son, Sang H.

307

Symbolic Scheduling Techniques 1 Ivan Radivojevi c, Forrest Brewer  

E-Print Network [OSTI]

- constrained scheduling which allows speculative operation execution in arbitrary forward-branching control subject to data/control-flow dependencies and resource constraints. Priority- based heuristic scheduling on detection of mutual exclusiveness in control/data-flow graphs (CDFGs). Tree scheduling (TS) [8] uses a tree

Brewer, Forrest D.

308

Stochastic Sensor Scheduling for Networked Control Systems Farhad Farokhi  

E-Print Network [OSTI]

Stochastic Sensor Scheduling for Networked Control Systems Farhad Farokhi and Karl H. Johansson Abstract Optimal sensor scheduling with applications to networked estimation and control systems to optimal control of Markov chains, we extract an optimal scheduling policy to fairly allocate the network

Johansson, Karl Henrik

309

Queueing-Theoretic Approaches for Dynamic Scheduling: Daria Terekhova  

E-Print Network [OSTI]

, 1999) Scheduling and control of flexible manufacturing sys- tems: a critical review (Basnet and MizeQueueing-Theoretic Approaches for Dynamic Scheduling: A Survey Daria Terekhova , Douglas G. DownbMaster University, Canada downd@mcmaster.ca Within the combinatorial scheduling community, there has been

Down, Doug

310

Constraint-based Scheduling Markus P.J. Fromherz  

E-Print Network [OSTI]

such as product assembly se- quencing. This makes constraint-based scheduling interesting to the control community planning, scheduling, and control tasks. This tutorial gives a brief introduction to constraint and reconfigurable con- trol, and the integration of various planning, scheduling, and control tasks

Fromherz, Markus P.J.

311

The Control of Burstiness in Fair Queueing Scheduling Liat Ashkenazi  

E-Print Network [OSTI]

The Control of Burstiness in Fair Queueing Scheduling Liat Ashkenazi and Hanoch Levy School to other scheduling algorithms. Those algorithms, in contrast, are subject to the burstiness problem. This paper studies the issue of bursty transmission in packet scheduling algo- rithms. We propose the Burst

Levy, Hanoch

312

Design of Gain-Scheduled Strictly Positive Real Controllers  

E-Print Network [OSTI]

Design of Gain-Scheduled Strictly Positive Real Controllers Using Numerical Optimization the linear SPR controllers, which compose the gain-scheduled controller. Second, we formulate the optimization problem associ- ated with the gain-scheduled controller itself. Restricting our in- vestigation

Damaren, Christopher J.

313

Energy Efficient Scheduling with Power Control for Wireless Networks  

E-Print Network [OSTI]

Energy Efficient Scheduling with Power Control for Wireless Networks Bastian Katz Institute the complexity of scheduling with power control in the SINRG model of interference. Based on a novel scheme) and less energy consumption: power control admits schedules that would otherwise violate interference

Paris-Sud XI, Université de

314

Feedback Control RealTime Scheduling: Framework, Modeling, and Algorithms *  

E-Print Network [OSTI]

1 Feedback Control Real­Time Scheduling: Framework, Modeling, and Algorithms * Chenyang Lu John A}@virginia.edu Abstract This paper presents a feedback control real­time scheduling (FCS) framework for adaptive real. In particular, we establish a dynamic model and performance analysis of several feedback control scheduling

Son, Sang H.

315

Multichannel Scheduling and Its Connection to Queueing Network Control Problem  

E-Print Network [OSTI]

Multichannel Scheduling and Its Connection to Queueing Network Control Problem Pouya Tehrani , Qing scheduling problem and a closed queueing network control problem which is known to be EXP-complete, we obtain {potehrani,qzhao}@ucdavis.edu Abstract--We consider the multichannel scheduling problem where the data rate

Islam, M. Saif

316

Computing Schedules for Time-Triggered Control using Genetic Algorithms  

E-Print Network [OSTI]

Computing Schedules for Time-Triggered Control using Genetic Algorithms Truong Nghiem Georgios E scheduling problem for timed-triggered controllers (OSTTC) and the time complexity of the corresponding search. Keywords: Scheduling; Digital control; Genetic algorithms; 1. INTRODUCTION Digital control theory

Fainekos, Georgios E.

317

Scheduling and Feedback Co-Design for Networked Control Systems  

E-Print Network [OSTI]

Scheduling and Feedback Co-Design for Networked Control Systems Michael S. Branicky,1 Stephen M mes- sages are transmitted). In the past, control system design and CPU scheduling or network scheduling design have normally been sepa- rated. This separation has allowed the control commu- nity

Branicky, Michael S.

318

A Cooperative Approach for Job Shop Scheduling under Uncertainties  

E-Print Network [OSTI]

control, consists to use a two-level resolution scheme: an off-line scheduling level builds upA Cooperative Approach for Job Shop Scheduling under Uncertainties C. BRIANDa,1 , S. OURARIb and B on job shop scheduling problems in a cooperative environment. Unlike classical deterministic approaches

Briand, Cyril

319

A QUALITY CONTROL FRAMEWORK FOR BUS SCHEDULE RELIABILITY  

E-Print Network [OSTI]

A QUALITY CONTROL FRAMEWORK FOR BUS SCHEDULE RELIABILITY JIE LIN*, University of Illinois Institute A QUALITY CONTROL FRAMEWORK FOR BUS SCHEDULE RELIABILITY Abstract This paper develops and demonstrates a quality control framework for bus schedule reliability. Automatic Vehicle Location (AVL) devices

Illinois at Chicago, University of

320

Feedback Control Real-Time Scheduling: Framework, Modeling, and Algorithms*  

E-Print Network [OSTI]

1 Feedback Control Real-Time Scheduling: Framework, Modeling, and Algorithms* Chenyang Lu John A}@virginia.edu Abstract This paper presents a feedback control real-time scheduling (FCS) framework for adaptive real. In particular, we establish a dynamic model and performance analysis of several feedback control scheduling

Son, Sang H.

Note: This page contains sample records for the topic "ring status schedules" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

A Novel Approach to Workflow Scheduling in MediGRID  

E-Print Network [OSTI]

A Novel Approach to Workflow Scheduling in MediGRID Dietmar Sommerfeld1 and Harald Richter2 If (Hardware and Robotics) #12;A Novel Approach to Workflow Scheduling in MediGRID Dietmar Sommerfeld1 four problems inherent to Grid scheduling that could be identified by means of measurements in the D-Grid

Zachmann, Gabriel

322

A New I/O Scheduler for Solid State Devices  

E-Print Network [OSTI]

parameters of solid state drives. Using the information from the parameter extraction, we present a new I/O scheduler design which utilizes the structure of solid state devices to efficiently schedule writes. The new scheduler, implemented on a 2.6 Linux...

Dunn, Marcus P.

2010-10-12T23:59:59.000Z

323

ON THE CONFIGURATION-LP FOR SCHEDULING ON UNRELATED MACHINES  

E-Print Network [OSTI]

ON THE CONFIGURATION-LP FOR SCHEDULING ON UNRELATED MACHINES JOS? VERSCHAE AND ANDREAS WIESE Abstract. One of the most important open problems in machine scheduling is the problem of scheduling a set of jobs on unrelated machines to minimize the makespan. The best known approximation algorithm

Nabben, Reinhard

324

Opportunistic Scheduling for utility maximization under QoS constraints  

E-Print Network [OSTI]

1 Opportunistic Scheduling for utility maximization under QoS constraints Neung-Hyung Lee, Jin. Our opportunistic scheduling aims at maximizing the utility which is usually expressed as a function of user throughput. In this paper we derive an off-line optimal scheduling policy by optimization theory

Bahk, Saewoong

325

Utility Accrual Real-Time Scheduling for Multiprocessor Embedded Systems  

E-Print Network [OSTI]

Utility Accrual Real-Time Scheduling for Multiprocessor Embedded Systems Hyeonjoong Cho a Binoy We present the first Utility Accrual (or UA) real-time scheduling algorithm for mul- tiprocessors, called global Multiprocessor Utility Accrual scheduling algorithm (or gMUA). The algorithm considers

Ravindran, Binoy

326

PREEMPTIVE RESUME SCHEDULING Alain Roy and Miron Livny  

E-Print Network [OSTI]

Chapter 9 CONDOR AND PREEMPTIVE RESUME SCHEDULING Alain Roy and Miron Livny Department of Computer. This introduces a number of problems, some of which are solved by Condor's preemptive resume scheduling, which is the focus of this paper. Pre- emptive resume scheduling allows jobs to be interrupted while running

Roy, Alain

327

Molecular Model of the Ring-Opening and Ring-Closure Reaction of a Fluorinated Indolylfulgide  

Science Journals Connector (OSTI)

Next, the role of the seam is elucidated by focusing on the energetic and structural characteristics of two further CoIns from that seam, one in the closed-ring region (CoInC) and one in the open-ring region (CoIncZc/tZc). ... A similar constellation is found at the open-ring side, where CoIncZc/tZc could be located (Figure 6, bottom). ... ring opening process in pyrrole has been investigated by performing classical on-the-fly dynamics using the multiconfiguration SCF method for the computation of energies and energy gradients. ...

Artur Nenov; Wolfgang J. Schreier; Florian O. Koller; Markus Braun; Regina de Vivie-Riedle; Wolfgang Zinth; Igor Pugliesi

2012-09-29T23:59:59.000Z

328

An Earned Schedule-based regression model to improve cost estimate at completion  

Science Journals Connector (OSTI)

Abstract Traditional Earned Value Management (EVM) index-based methods for Cost Estimate at Completion (CEAC) of an ongoing project have been known for their limitations inherent with both the assumption that past EVM data is the best available information and early-stage unreliability. In an attempt to overcome such limitations, a new CEAC methodology is proposed based on a modified index-based formula predicting expected cost for the remaining work with the Gompertz growth model via nonlinear regression curve fitting. Moreover, the proposed equation accounts for the schedule progress as a factor of cost performance. To this end, it integrates into its equation an Earned Schedule-based factor indicating expected duration at completion. The proposed model shows itself to be more accurate and precise in all early, middle, and late stage estimates than those of four compared traditional index-based formulae. The developed methodology is a practical tool for Project Managers to better incorporate the progress status into the task of computing CEAC and is a contribution to extending EVM research to better capture the inherent relation between cost and schedule factors.

Timur Narbaev; Alberto De Marco

2014-01-01T23:59:59.000Z

329

Automation Status | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Automation Status Automation Status Presented at the NREL Hydrogen and Fuel Cell Manufacturing R&D Workshop in Washington, DC, August 11-12, 2011. mfg2011plenarysperrick.pdf More...

330

A Joint Transmission Grant Scheduling and Wavelength Assignment in Multichannel SG-EPON  

Science Journals Connector (OSTI)

In this paper, we investigate the problem of transmission grant scheduling in multichannel optical access networks using a scheduling theoretic ...

Meng, Lehan; El-Najjar, Jad; Alazemi, Hamed; Assi, Chadi

2009-01-01T23:59:59.000Z

331

The Completion of an Archimedean f-Ring  

Science Journals Connector (OSTI)

......archimedean /-ring has a completion; in fact, every such ring...and closed sets in SC. THE COMPLETION OF AN ABCHIMEDEAN /-RING...there is a point ye% and and index AeA such that/A(y...Theorem except LEMMA 3. The completion of an archimedean f-ring......

D. G. Johnson

1965-01-01T23:59:59.000Z

332

Process for Scheduling Electives The Student Affairs/MSP Office collects core clerkship scheduling requests from rising M-3 and  

E-Print Network [OSTI]

rotations for this time and have no control over other schools' scheduling processes. wwwUICOM - UC Process for Scheduling Electives The Student Affairs/MSP Office collects core clerkship scheduling requests from rising M-3 and M-4 students. Individual clinical departments arrange other

Gilbert, Matthew

333

Abstract--A simple method is presented to reduce the number of scheduling parameters for gain-scheduled  

E-Print Network [OSTI]

to a zero- parameter or LTI controller design problem in the dimensionless domain. The dimensionless gain-scheduling. Index Terms--Gain scheduling, gantry control, pi theorem, dimensionless parameters, nondimensional representation I. INTRODUCTION AIN scheduling is a popular method to control systems whose linearized model

Brennan, Sean

334

Tune measurement in the APS ring  

SciTech Connect (OSTI)

The APS system will contain three rings. The first is a positron accumulator ring (PAR). Its function is to coalesce 24, 30-ns-long positron bunches into one 290-ps bunch. The second is the injector synchrotron (IS). It accelerates the 450-MeV positron bunches to 7 Gev for injection into the storage ring (SR). Betatron and synchrotron motion frequently occurs in circular machines, without any deliberate excitation. However, the amplitudes of this motion cannot be predicted. Therefore, it is desirable to have controlled ways to excite these modes. Two types of devices will be used to excite the beam. One will be a magnetic kicker or bumper. All rings already have these devices planned for the horizontal direction for injecting and extracting beams. Some of these magnets will be used for exiting horizontal betatron motion. In the storage ring, a special kicker will be installed to produce up to 1 mm amplitude motion in the vertical direction. Two 8.4-in striplines (SL) (1/4 wavelength at 352 MHz) will be installed on all rings. One stripline in each ring will be used to drive all three tunes, and the other stripline will be used as a pickup. In the PAR and IS, the pickup stripline will be in a dispersive region. This will allow observation of both betatron and synchrotron motions. In the SR, the stripline will be in a nondispersive region because it is not practical to install it in a dispersive region. To do synchrotron tune measurements in the SR, one of the button BPMs located in a dispersive region will be used. To minimize development effort, as much of the BPM system electronics as possible will be used in the tune measurement system. The BPM electronics uses the AMP/PM conversion technique. This system operates at 352 MHz. Thus, tune measurement components were also designed to operate at 352 MHz.

Sellyey, W.; Kahana, E.; Wang, X.

1993-07-01T23:59:59.000Z

335

Current status of the Taiwan Photon Source project  

SciTech Connect (OSTI)

The progress of establishment of a high brightness and low emittance mid-energy storage ring is reported. The status of the 3 GeV Taiwan Photon Source (TPS) currently under construction will be presented. The progress on the civil construction, manufacturing of machine components, as well as the opportunity of using low emittace synchrotron source and phase I beamlines at TPS will be mentioned. The future planning of phase II beamlines and related research will be sketched. Future developments will be also briefly outlined.

Chang, Shih-Lin [National Synchrotron Radiation Research Center, 101 Hsin-Ann Road, Hsinchu Science Park, Hsinchu, 30076 Taiwan (China)

2014-03-05T23:59:59.000Z

336

"Annual NEPA Planning Summary Status of Ongoing NEPA Compliance Activities: Environmental Assessments"  

Broader source: Energy.gov (indexed) [DOE]

Status of Ongoing NEPA Compliance Activities: Environmental Assessments" Status of Ongoing NEPA Compliance Activities: Environmental Assessments" "NNSA NA-21" "January 2012" "#","*Title, Location","Estimated Cost","Estimated Schedule (**NEPA Milestones)",,"Description" ,"U.S.-origin Spent Nuclear Fuel Returned to the United States from Austria in 2025",250000,"Determination Date:","February 2012","NA-21 seeks to analyze the impacts of U.S.-origin spent nuclear fuel returned to the United States from Austria in 2025 since current NEPA documentation for the U.S.-Origin Remove Program does not address this scenario." ,,,"Transmittal to State:","March 2012"

337

Jefferson Lab Science Series - Current Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Current Science Series Schedule Current Science Series Schedule Lectures are free and open to students and adults with an interest in science. All lectures begin at 7:00 pm in CEBAF Center Auditorium [Download a Map] [Locate Jefferson Lab on Google Maps] [Display a QR Code for Scanning] and last for about an hour. Seating in the CEBAF Center Auditorium and overflow area is limited to about 300 people. Seating is on a first come, first served basis. Unfortunately, people arriving once capacity has been reached will be turned away. A live video stream will be available for those not able to attend in person. Lectures will be added to the video archive for on-demand viewing upon approval from the presenter. NOTICE: For security purposes, everyone over 16 is asked to carry a photo I.D. Security guards may inspect vehicles, book bags and purses.

338

Proposal Submittal and Scheduling Procedures for Macromolecular  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Proposal Submittal and Scheduling Procedures for Macromolecular Proposal Submittal and Scheduling Procedures for Macromolecular Crystallography Beam time for macromolecular crystallography projects is obtained by submitting an SSRL Macromolecular Crystallography Proposal. This proposal is peer reviewed by the Structural Molecular Biology and Biophysics subpanel of the SSRL Proposal Review Panel (PRP) for scientific merit and rating and for criticality of synchrotron radiation use. Proposal Forms New Proposal Request Form (note: you must be a registered user to submit a proposal through our User Portal. Click on "Become a New User" link to register.) Extension Application for Macromolecular Crystallography Proposals Rapid Access Application Form Types of Proposals Proposals should be submitted under one of the following classifications.

339

400A Construction Schedule | Advanced Photon Source  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

APCF APCF Past APCF Memoranda APCF Past Construction Past APCF Construction Day Activity Impact Monday - 10.01.12 Excavation Small Concrete Small Site Utilities Small Tuesday - 10.02.12 Excavation Small Concrete Small Site Utilities Small Wednesday - 10.03.12 Excavation Small Concrete Small Site Utilities Moderate Thursday - 10.04.12 Excavation Small Concrete Small Site Utilities Moderate Friday - 10.05.12 Excavation Small Concrete Small Site Utilities Moderate Site Utility water line hot tap Moderate Saturday - 10.06.12 No work is scheduled for the weekends -/- Sunday - 10.07.12 No work is scheduled for the weekends -/- Monday - 10.08.12 Excavation Small Concrete Small Interior underground plumbing Small Site Utilities Moderate Site Utility water line hot tap Moderate

340

Physical Chemistry of Ionic Liquids Symposium Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(Tentative Schedule, locations and times to be determined) (Tentative Schedule, locations and times to be determined) Sunday Morning Structure and Heterogeneity of Ionic Liquids I. James Wishart and Edward Castner Introductory Remarks Andre Pinkert Hydroxyamine ionic liquids and their properties Thomas Strassner TAAILs - Tunable Aryl-Alkyl Ionic Liquids: A new generation of ionic liquids Laura Sprunger Grubbs Thermodynamic Properties of New Generation Ionic Liquids Christopher Hardacre Prediction methods for physical properties of ionic liquids BREAK Patricia Hunt What happens when you functionalise an ionic liquid with a "silicone" side chain? Edward L Quitevis Effect of cation symmetry and nanoscale segregation on the morphology, physical properties, and low-frequency vibrational dynamics of 1,3-dialkylimidazolium cation ionic liquids

Note: This page contains sample records for the topic "ring status schedules" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Rate Schedule COTP-T3  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

COTP-T3 COTP-T3 (Supersedes Schedule COTP-T2) UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CALIFORNIA-OREGON TRANSMISSION PROJECT SCHEDULE OF RATE FOR POINT-TO-POINT TRANSMISSION SERVICE Effective: October 1, 2011, through September 30, 2016. Available: Within the marketing area served by the Western Area Power Administration (Western), Sierra Nevada Customer Service Region. Applicable: To customers receiving California-Oregon Transmission Project (COTP) firm and/or non-firm point-to-point (PTP) transmission service. Character and Conditions of Service: Transmission service for three-phase, alternating current at 60-hertz, delivered and metered at the voltages and points of delivery or receipt, adjusted for losses, and delivered to points of

342

Hilton Alexandria Mark Center Shuttle Schedule  

Broader source: Energy.gov (indexed) [DOE]

Hilton Alexandria Mark Center Shuttle Schedule Hilton Alexandria Mark Center Shuttle Schedule 5000 Seminary Road, Alexandria, VA 22311 703-845-1010 The Hilton Alexandria Mark Center offers complimentary shuttle service every half hour at :00 and :30, 7 days a week. Our first departure from the hotel is 6:00 AM and our last departure from the hotel is 10:30 pm, to Pentagon City Mall/Metro (on the blue and yellow line) and Ronald Reagan Washington National Airport The van arrives at Pentagon City at approximately 10 and 40 minutes after the hour. Our last pick up is at approximately 10:40pm. Upon exiting the metro, exit left, and take the escalator outside. We pick up at the island in front of the Ritz Carlton and Fashion Center Mall. The next stop is Ronald Reagan Washington National Airport The van arrives at the airport at approximately 20 and 50 minutes after the

343

Rate Schedule CV-F13  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

F13 F13 (Supersedes Schedule CV-F12) UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT SCHEDULE OF RATES FOR BASE RESOURCE AND FIRST PREFERENCE POWER Effective: October 1, 2011, through September 30, 2016. Available: Within the marketing area served by the Western Area Power Administration (Western), Sierra Nevada Customer Service Region. Applicable: To the Base Resource (BR) and First Preference (FP) Power Customers. Character and Conditions of Service: Alternating current, 60-hertz, three-phase, delivered and metered at the voltages and points established by contract. This service includes the Central Valley Project (CVP) transmission (to include reactive supply and voltage control from Federal generation sources needed to support

344

Rate Schedule CV-TPT7  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

TPT7 TPT7 (Supersedes Schedule CV-TPT6) UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT SCHEDULE OF RATE FOR TRANSMISSION OF WESTERN POWER BY OTHERS Effective: October 1, 2011, through September 30, 2016. Available: Within the marketing area served by the Western Area Power Administration (Western), Sierra Nevada Customer Service Region. Applicable: To Western's power service customers who require transmission service by a third party to receive power sold by Western. Character and Conditions of Service: Transmission service for three-phase, alternating current at 60-hertz, delivered and metered at the voltages and points of delivery or receipt, adjusted for losses, and delivered to points as

345

Duke-1-E Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1-E Wholesale Power Rate Schedule 1-E Wholesale Power Rate Schedule Duke-1-E Wholesale Power Rate Schedule Area: Duke On-System System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina to whom power may be transmitted and scheduled pursuant to contracts between the Government and Duke Energy Company (hereinafter called the Company) and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does

346

Replacement-1 Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Replacement-1 Wholesale Power Rate Schedule Replacement-1 Wholesale Power Rate Schedule Replacement-1 Wholesale Power Rate Schedule Area: Replacement Energy System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, Florida, South Carolina, or North Carolina to whom power is provided pursuant to contracts between the Government and the Customer. This rate schedule shall be applicable to the sale at wholesale energy purchased to meet contract minimum energy and sold under appropriate contracts between the Government and the Customer. Document Available for Download Replacement-1 Rate Schedule More Documents & Publications Replacement-3 Wholesale Power Rate Schedule

347

CC-1-I Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

CC-1-I Wholesale Power Rate Schedule CC-1-I Wholesale Power Rate Schedule CC-1-I Wholesale Power Rate Schedule Area: Carolina Power & Light Company, Western Division System: CU This rate schedule shall be available to public bodies and cooperatives served through the facilities of Carolina Power & Light Company, Western Division (hereinafter called the Customers). This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereinafter called collectively the "Cumberland Projects") and sold in wholesale quantities. Document Available for Download CC-1-I Rate Schedule More Documents & Publications CM-1-H Wholesale Power Rate Schedule

348

Santee-3-E Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3-E Wholesale Power Rate Schedule 3-E Wholesale Power Rate Schedule Santee-3-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter call the Customer) in South Carolina to whom power may be scheduled pursuant to contracts between the Government and South Carolina Public Service Authority (hereinafter called the Authority). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does

349

Santee-1-E Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1-E Wholesale Power Rate Schedule 1-E Wholesale Power Rate Schedule Santee-1-E Wholesale Power Rate Schedule Area: Central, Bamberg, and Georgetown System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter call the Customer) in South Carolina to whom power may be wheeled and scheduled pursuant to contracts between the Government and South Carolina Public Service Authority (hereinafter called the Authority). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does

350

Pump-2 Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2 Wholesale Power Rate Schedule 2 Wholesale Power Rate Schedule Pump-2 Wholesale Power Rate Schedule Area: Carters & Russell Pumping-Self Schedulers System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives who provide their own scheduling arrangement and elect to allow Southeastern to use a portion of their allocation for pumping (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, Florida, South Carolina, or North Carolina to whom power is provided pursuant to contracts between the Government and the Customer. This rate schedule shall be applicable to the sale at wholesale energy generated from pumping operations at the Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and

351

Integrated test schedule for buried waste integrated demonstration  

SciTech Connect (OSTI)

The Integrated Test Schedule incorporates the various schedules the Buried Waste Integrated Demonstration (BWID) supports into one document. This document contains the Federal Facilities Agreement and Consent Order schedules for the Idaho National Engineering Laboratory, Hanford Reservation, Oak Ridge Reservation, and Fernald Environmental Materials Center. Included in the Integrated Test Schedule is the Buried Waste Integrated Demonstration ``windows of opportunity`` schedule. The ``windows of opportunity`` schedule shows periods of time in which Buried Waste Integrated Demonstration Program-sponsored technology demonstrations could support key decisions in the Federal Facilities Agreement and Consent Order. Schedules for the Buried Waste Integrated Demonstration-sponsored technology task plans are categorized by technology area and divided by current fiscal year and out-year. Total estimated costs for Buried Waste Integrated Demonstration-sponsored Technology Task Plans for FY-92 through FY-97 are $74.756M.

Brown, J.T.; McDonald, J.K.

1992-05-01T23:59:59.000Z

352

Integrated test schedule for buried waste integrated demonstration  

SciTech Connect (OSTI)

The Integrated Test Schedule incorporates the various schedules the Buried Waste Integrated Demonstration (BWID) supports into one document. This document contains the Federal Facilities Agreement and Consent Order schedules for the Idaho National Engineering Laboratory, Hanford Reservation, Oak Ridge Reservation, and Fernald Environmental Materials Center. Included in the Integrated Test Schedule is the Buried Waste Integrated Demonstration windows of opportunity'' schedule. The windows of opportunity'' schedule shows periods of time in which Buried Waste Integrated Demonstration Program-sponsored technology demonstrations could support key decisions in the Federal Facilities Agreement and Consent Order. Schedules for the Buried Waste Integrated Demonstration-sponsored technology task plans are categorized by technology area and divided by current fiscal year and out-year. Total estimated costs for Buried Waste Integrated Demonstration-sponsored Technology Task Plans for FY-92 through FY-97 are $74.756M.

Brown, J.T.; McDonald, J.K.

1992-05-01T23:59:59.000Z

353

Duke-4-E Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4-E Wholesale Power Rate Schedule 4-E Wholesale Power Rate Schedule Duke-4-E Wholesale Power Rate Schedule Area: Duke Self-Schedulers System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina served through the transmission facilities of Duke Energy Company (hereinafter called the Company) and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does

354

CC-1-I Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

CC-1-I Wholesale Power Rate Schedule CC-1-I Wholesale Power Rate Schedule CC-1-I Wholesale Power Rate Schedule Area: Carolina Power & Light Company, Western Division System: CU This rate schedule shall be available to public bodies and cooperatives served through the facilities of Carolina Power & Light Company, Western Division (hereinafter called the Customers). This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereinafter called collectively the "Cumberland Projects") and sold in wholesale quantities. Document Available for Download CC-1-I Rate Schedule More Documents & Publications CM-1-H Wholesale Power Rate Schedule

355

Adaptable search neighborhoods for Resource Constrained Scheduling  

E-Print Network [OSTI]

dispatching rule. When evaluating the merit of the schedule associated with (L, p), the original data set, ps, is usecl. Three msiu advantages result from the use of these new search spaces. First, problem specific knowledge is incorporated into the search...) dispatching if the perfcrmance is based on completion times (makespsn. or f. . 'ow-tirres), or use earliest-due-date (EDD) dispatching if the performance is due-dste based (tardiness). In order to illustrate the implementation of these concepts, examples...

Balakrishnan, Ramamoorthy

1993-01-01T23:59:59.000Z

356

Weekly Petroleum Status Report  

U.S. Energy Information Administration (EIA) Indexed Site

Petrolem Reports Petrolem Reports Weekly Petroleum Status Report Data for week ending Dec. 13, 2013 | Release Date: Dec. 18, 2013 | Next Release Date: Dec. 27, 2013 | full report Previous Issues Week: December 18, 2013 December 11, 2013 December 4, 2013 November 27, 2013 November 20, 2013 November 14, 2013 November 6, 2013 October 30, 2013 October 23, 2013 October 21, 2013 October 9, 2013 October 2, 2013 prior issues Go The petroleum supply situation in the context of historical information and selected prices. Released after 10:30 a.m. 1:00 p.m. Highlights Weekly Petroleum Status Report Highlights PDF PDF Data Overview (Combined Table 1 and Table 9) PDF Tables 1 U.S. Petroleum Balance Sheet CSV XLS PDF 2 U.S. Inputs and Production by PAD District CSV XLS PDF

357

Small Business Status  

Broader source: Energy.gov (indexed) [DOE]

Impact of Teaming Arrangements on Impact of Teaming Arrangements on Small Business Status The Department of Energy is planning to set aside for small businesses a number of acquisitions of a very complex nature, requiring a myriad of capabilities on the part of offerors, which might result in teaming arrangements or joint ventures being formed. Given this, the Department believes that potential offerors should be aware of the Small Business Administration's regulations regarding affiliation. As such, DOE will include the following provision in solicitations where it expects teaming or joint ventures to propose. GUIDANCE FOR PROSPECTIVE OFFERORS - IMPACT OF TEAMING ARRANGEMENTS ON SMALL BUSINESS STATUS (a) This procurement has been set aside for small business. In order to ensure that award

358

ESnet Planning, Status,  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ESnet Planning, Status, ESnet Planning, Status, and Future Issues William E. Johnston, ESnet Department Head and Senior Scientist Joe Burrescia, General Manager Mike Collins, Chin Guok, and Eli Dart, Engineering Brian Tierney, Advanced Development Jim Gagliardi, Operations and Deployment Stan Kluz, Infrastructure and ECS Mike Helm, Federated Trust Dan Peterson, Security Officer Gizella Kapus, Business Manager and the rest of the ESnet Team wej@es.net, this talk is available at www.es.net Energy Sciences Network Lawrence Berkeley National Laboratory Networking for the Future of Science ASCAC, August 2008 2 DOE Office of Science and ESnet - the ESnet Mission * ESnet is an Office of Science ("SC") facility in the Office of Advanced Scientific Computing Research ("ASCR")

359

Site Specific Records Schedules | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Site Specific Records Schedules Site Specific Records Schedules Site Specific Records Schedules NOTE: Most of the files below are in PDF, you will need Acrobat® Reader(tm) to view these files. TITLE DATE LAST CHANGED AUTHORIZATION NUMBER AEC -- Administrative Record (pdf) 01/15/01 II-NNA-6754 AEC -- Nuclear Power Plant Docket Records (pdf) 01/15/01 NC-174-231 AEC -- Power Reactor Records (pdf) 01/15/01 II-NNA-2110 Alaska Power Administration (pdf) 02/09/01 N1-447-97-1 Appointee Clearance and Vetting Files (pdf) 09/10/02 N1-434-96-3 Bettis Atomic Laboratory Naval Reactors (pdf) 09/09/91 N1-434-91-8 Bonneville Power Administration (pdf) 08/06/07 N1-305-07-1 Cyclotron Records, Lawrence Berkeley National Laboratory (pdf) 12/22/88 N1-434-89-7 Energy Information Administration (EIARS) (pdf) 10/21/03 N1-434-96-2

360

Hanford Site Environmental Surveillance Master Sampling Schedule  

SciTech Connect (OSTI)

Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program: and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling design is described in the Operations Office, Environmental Monitoring Plan, United States Department of Energy, Richland DOE/RL-91-50, Rev.2, U.S. Department of Energy, Richland, Washington. This document contains the CY 2000 schedules for the routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section includes sampling locations, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis and may not be collected in 2000 in which case the anticipated year for collection is provided. In addition, a map showing approximate sampling locations is included for each media scheduled for collection.

LE Bisping

2000-01-27T23:59:59.000Z

Note: This page contains sample records for the topic "ring status schedules" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Weekly Natural Gas Storage Report Schedule  

Weekly Natural Gas Storage Report (EIA)

Weekly Natural Gas Storage Report Schedule Weekly Natural Gas Storage Report Schedule Holiday Release Schedule The standard release time and day of the week will be at 10:30 a.m. (Eastern time) on Thursdays with the following exceptions. All times are Eastern. Alternate Release Date Release Day Release Time Holiday 11/27/2013 Wednesday 12:00 p.m. 11/28/2013 (Thursday) is Thanksgiving Day 12/27/2013 Friday 10:30 a.m. 12/25/2013 (Wednesday) is Christmas Day 1/3/2014 Friday 10:30 a.m. 1/1/2014 (Wednesday) is New Year's Day 11/14/2014 Friday 10:30 a.m. 11/11/2014 (Tuesday) is Veterns Day 11/26/2014 Wednesday 12:00 p.m. 11/27/2014 (Thursday) is Thanksgiving Day 12/24/2014 Wednesday 12:00 p.m. 12/25/2014 (Thursday) is Christmas Day 12/31/2014 Wednesday 12:00 p.m. 1/1/2015 (Thursday) is New Year's Day

362

Gasket and snap ring installation tool  

DOE Patents [OSTI]

A tool for installing a gasket and a snap ring including a shaft, a first plate attached to the forward end of the shaft, a second plate slidably carried by the shaft, a spring disposed about the shaft between the first and second plates, and a sleeve that is free to slide over the shaft and engage the second plate. The first plate has a loading surface with a loading groove for receiving a snap ring and a shoulder for holding a gasket. A plurality of openings are formed through the first plate, communicating with the loading groove and approximately equally spaced about the groove. A plurality of rods are attached to the second plate, each rod slidable in one of the openings. In use, the loaded tool is inserted into a hollow pipe or pipe fitting having an internal flange and an internal seating groove, such that the gasket is positioned against the flange and the ring is in the approximate plane of the seating groove. The sleeve is pushed against the second plate, sliding the second plate towards the first plate, compressing the spring and sliding the rods forwards in the openings. The rods engage the snap ring and urge the ring from the loading groove into the seating groove.

Southerland, Jr., James M. (Aiken, SC); Barringer, Jr., Curtis N. (Orangeburg, SC)

1994-01-01T23:59:59.000Z

363

Application for Research Affiliate Associate & Student Status...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Research Affiliate Program Application for Research Affiliate Associate & Student Status Application for Research Affiliate Associate & Student Status The following application...

364

National Hydrogen Learning Demonstration Status | Department...  

Energy Savers [EERE]

Hydrogen Learning Demonstration Status National Hydrogen Learning Demonstration Status Download presentation slides from the Fuel Cell Technologies Program webinar "National...

365

Status of JUPITER Program  

SciTech Connect (OSTI)

To obtain the data necessary for evaluating the nuclear design method of a large-scale fast breeder reactor, criticality tests with a large- scale homogeneous reactor were conducted as part of a joint research program by Japan and the U.S. Analyses of the tests are underway in both countries. The purpose of this paper is to describe the status of this project.

Inoue, T.; Shirakata, K.; Kinjo, K.; Ikegami, T.; Yamamoto, M.

1981-03-10T23:59:59.000Z

366

MARS Flight Engineering Status  

SciTech Connect (OSTI)

The Multi-sensor Airborne Radiation Survey Flight Engineering project (MARS FE) has designed a high purity germanium (HPGe) crystal array for conducting a wide range of field measurements. In addition to the HPGe detector system, a platform-specific shock and vibration isolation system and environmental housing have been designed to support demonstration activities in a maritime environment on an Unmanned Surface Vehicle (USV). This report describes the status of the equipment as of the end of FY09.

Fast, James E.; Dorow, Kevin E.; Morris, Scott J.; Thompson, Robert C.; Willett, Jesse A.

2010-04-06T23:59:59.000Z

367

SNS Ring, Spallation Neutron Source, SNS  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

RING RING Lattice Version 1.0 in MAD structure Version 1.1: SNSRing.v.1.1 | 623_620_00.mad Version 1.2 SNSRing.v.1.2 | 623_620_00.mad Matching example MAD optics outputs UAL compatible input example Schematic (one super-period) and mechanical drawing Diagnostics Impedance budget Magnets List and mechanical parameters Mechanical drawings Magnetic field modeling and measurements Installation and survey Power supplies summary and changes Polarity conventions tech.memo and schematic (A polarity) Magnet assemblies Documentation ASAC review presentations DOE review presentations SNS/BNL tech.notes, conference and journal papers SNS/ORNL papers SNS project documentation Other links SNS ring aperture, collimation and beam losses SNS transfer lines SNS/BNL Accelerator Physics SNS/ORNL Accelerator Physics

368

Photoneutron production inside the APS Storage Ring  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

4 4 Neutron Fluence Estimates Inside the APS Storage Ring During Normal Operation P.K. Job and J. Alderman Advanced Photon Source Argonne National Laboratory April 2002 Neutron Fluence Estimates Inside the APS Storage Ring During Normal Operation P.K. Job and J. Alderman Advanced Photon Source Argonne National Laboratory April 2002 Introduction In an electron storage ring, neutrons are generated as a result of the electron beam interaction with high-Z materials, such as scrapers and collimators [1]. When the energy of the incident electron beam is sufficiently high, it can produce high-energy photons, which subsequently interact with a nucleus, resulting in the emission of nucleons. This interaction is known as a photonuclear interaction. For photons with energies above the

369

Coherence and persistent currents in mesoscopic rings  

Science Journals Connector (OSTI)

We calculate, to first order in the screened electron-electron interaction, the grand potential and the equilibrium current in a mesoscopic normal-metal ring threaded by a magnetic flux. The average current in an ensemble of such rings is found to be periodic in the flux with period h/2e, and to be given at zero temperature in order of magnitude by I?evFl/L2, where l is the mean free path and L the circumference of the ring. Interference between time-reversed paths, as in the theory of weak localization, is the crucial ingredient. The effect decreases exponentially with temperature on a scale determined by the coherence energy ?hD/L2, where D is the electronic diffusion constant. The results are in good agreement with recent measurements.

Vinay Ambegaokar and Ulrich Eckern

1990-07-16T23:59:59.000Z

370

On cohomology rings of infinite groups.  

E-Print Network [OSTI]

Let R be any ring (with 1), \\Gamma a group and R\\Gamma the corresponding group ring. Let Ext_{R\\Gamma}^{*}(M,M) be the cohomology ring associated to the R\\Gamma-module M. Let H be a subgroup of finite index of \\Gamma. The following is a special version of our main Theorem: Assume the profinite completion of \\Gamma is torsion free. Then an element \\zeta in Ext_{R\\Gamma}^{*}(M,M) is nilpotent (under Yoneda's product) if and only if its restriction to Ext_{RH}^{*}(M,M)$ is nilpotent. In particular this holds for the Thompson group. There are torsion free groups for which the analogous statement is false.

Eli Aljadeff

371

EBIS Project Status Meeting  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

4, 2012 4, 2012 Electron Lens 2 E-Lens Magnet, Tooling Magnet * Cold mass, cryostat drawing work continues (SP/PK/SS) * Yoke NLE Restraint Cylinder - 1 more rework for leads (RC/SP) * Part orders being prioritized, released; bellows, cryo valve, heat shield, etc. (SRP) Tooling * Testing Top Hat assembly complete (RM/SD/DC/WM etc.) * Cryostatting, pressure test fixture Mods in CS (PK) - supporting schedule * Magnetic Needle Tooling - COMPLETE 3 Main Solenoid Coils 2 nd main solenoid * CS machining complete * Stainless steel support machining complete 4 AFF, FF Solenoid coils * FF coil #1 - FF coil #4 * Mods complete to ID to fit to main support tube * AFF #3 Final electrical tests complete (DI) * AFF #4 overwrap & cure, Final electrical tests complete (DI) 5 eLens - Cold Test Assembly Magnet #1:

372

EBIS Project Status Meeting  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

April 12, 2011 April 12, 2011 Electron Lens 2 Outline Corrector coils Main solenoid coils Anti-Fringe field, Fringe Field coils Schedule 3 Corrector coils * 1 st Coil winding complete * 2 nd Coil winding started * OVEN - need "retort" for final cure (AM/RC) 4 Main Solenoid Coils * Support tube insulated, Kapton wrinkled due to out-gassing during cure; re-insulated & cured without problem * Internal support flanges installed, insulated * Hipot complete * Lead end "lead" flange received * Released winding travelers are available * Parts deliveries 90% complete * Dimensional issue investigated, resolved - to be checked Monday 4/11 (LR) * Winding should start ~ 4/13 5 AFF, FF Solenoid coils * AFF support hub, Winding machine upgrade are complete * AFF Coil #1 * complete * AFF Coil #2

373

Ground Ring Of Two Dimensional String Theory  

E-Print Network [OSTI]

String theories with two dimensional space-time target spaces are characterized by the existence of a ``ground ring'' of operators of spin $(0,0)$. By understanding this ring, one can understand the symmetries of the theory and illuminate the relation of the critical string theory to matrix models. The symmetry groups that arise are, roughly, the area preserving diffeomorphisms of a two dimensional phase space that preserve the fermi surface (of the matrix model) and the volume preserving diffeomorphisms of a three dimensional cone. The three dimensions in question are the matrix eigenvalue, its canonical momentum, and the time of the matrix model.

Edward Witten

1991-08-16T23:59:59.000Z

374

NOAA Technical Memorandum NMFS-AFSC-212 Status Review of the Ringed Seal  

E-Print Network [OSTI]

. Kelly, J. L. Bengtson, P. L. Boveng, M. F. Cameron, S. P. Dahle, J. K. Jansen, E. A. Logerwell, J. E. Kelly, J. L. Bengtson, P. L. Boveng, M. F. Cameron, S. P. Dahle, J. K. Jansen, E. A. Logerwell, J. E for Fisheries B. P. Kelly1 , J. L. Bengtson1 , P. L. Boveng1 , M. F. Cameron1 , S. P. Dahle1 , J. K. Jansen1 , E

375

Distributed Generation Status Update  

Broader source: Energy.gov (indexed) [DOE]

0 DOE Peer Review Presentation 0 DOE Peer Review Presentation © Chevron 2010 CERTS Microgrid Demonstration with Large scale Energy Storage & Renewable Generation November 5, 2010 Presented By: Craig Gee, Project Manager (for Mr. Eduardo Alegria - Principal Investigator) Energy Solutions November 2010 DOE Peer Review Presentation © Chevron 2010 Agenda * Introduction - Who we are * Project Team & Site * Project Purpose & Objectives * Project Impacts * System Elements * Project Status * Research Elements * Recent Developments in California * Questions & Comments November 2010 DOE Peer Review Presentation © Chevron 2010 Chevron Energy Solutions Designed & Implemented over 900 Projects in the U.S.  Chevron ES, a division of Chevron USA, Inc. is committed to delivering economically & environmentally advantageous green

376

CHEF: a status report  

SciTech Connect (OSTI)

CHEF refers both to a framework and to an interactive application emphasizing accelerator optics calculations. The framework supports multiple domains of applications: e.g. nonlinear analysis, perturbation theory, and tracking. Its underlying philosophy is to provide an infrastructure with minimum hidden implicit assumptions, general enough to facilitate both routine and specialized computational tasks, and to minimize the duplication of necessary, complex bookkeeping tasks. CHEF was already described in recent conferences. This paper is a status report on recent developments, including issues related to applications to high energy linacs.

Ostiguy, J.-F.; Michelotti, L.; /Fermilab

2007-06-01T23:59:59.000Z

377

Status of Climate Change  

E-Print Network [OSTI]

Status of Climate Change 2013 CaTee Conference San Antonio 2013 ESL-KT-13-12-56 CATEE 2013: Clean Air Through Energy Efficiency Conference, San Antonio, Texas Dec. 16-18 Menu for Today IPCC 2013: Assessment Report #5 Facts about Climate Change... Who will Win, Who will Lose What Needs to be Done ESL-KT-13-12-56 CATEE 2013: Clean Air Through Energy Efficiency Conference, San Antonio, Texas Dec. 16-18 IPCC #5 No great surprises - Sharper language Uncertainties are still large Essentially...

North, G.

2013-01-01T23:59:59.000Z

378

Model Validation Status Review  

SciTech Connect (OSTI)

The primary objective for the Model Validation Status Review was to perform a one-time evaluation of model validation associated with the analysis/model reports (AMRs) containing model input to total-system performance assessment (TSPA) for the Yucca Mountain site recommendation (SR). This review was performed in response to Corrective Action Request BSC-01-C-01 (Clark 2001, Krisha 2001) pursuant to Quality Assurance review findings of an adverse trend in model validation deficiency. The review findings in this report provide the following information which defines the extent of model validation deficiency and the corrective action needed: (1) AMRs that contain or support models are identified, and conversely, for each model the supporting documentation is identified. (2) The use for each model is determined based on whether the output is used directly for TSPA-SR, or for screening (exclusion) of features, events, and processes (FEPs), and the nature of the model output. (3) Two approaches are used to evaluate the extent to which the validation for each model is compliant with AP-3.10Q (Analyses and Models). The approaches differ in regard to whether model validation is achieved within individual AMRs as originally intended, or whether model validation could be readily achieved by incorporating information from other sources. (4) Recommendations are presented for changes to the AMRs, and additional model development activities or data collection, that will remedy model validation review findings, in support of licensing activities. The Model Validation Status Review emphasized those AMRs that support TSPA-SR (CRWMS M&O 2000bl and 2000bm). A series of workshops and teleconferences was held to discuss and integrate the review findings. The review encompassed 125 AMRs (Table 1) plus certain other supporting documents and data needed to assess model validity. The AMRs were grouped in 21 model areas representing the modeling of processes affecting the natural and engineered barriers, plus the TSPA model itself Description of the model areas is provided in Section 3, and the documents reviewed are described in Section 4. The responsible manager for the Model Validation Status Review was the Chief Science Officer (CSO) for Bechtel-SAIC Co. (BSC). The team lead was assigned by the CSO. A total of 32 technical specialists were engaged to evaluate model validation status in the 21 model areas. The technical specialists were generally independent of the work reviewed, meeting technical qualifications as discussed in Section 5.

E.L. Hardin

2001-11-28T23:59:59.000Z

379

Solar Decathlon 2005 Daily Event Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DAILY EVENT SCHEDULE DAILY EVENT SCHEDULE Last updated on September 30, 2005 Note: This schedule is not part of the official Rules and Regulations and is subject to change at any time. Weds, Sept 28 12:00 AM 12:30 AM 1:00 AM 1:30 AM 2:00 AM 2:30 AM 3:00 AM 3:30 AM 4:00 AM 4:30 AM 5:00 AM 5:30 AM 6:00 AM 6:30 AM 7:00 AM 7:30 AM 8:00 AM 8:30 AM 9:00 AM 9:30 AM 10:00 AM 10:30 AM 11:00 AM 11:30 AM 12:00 PM 12:30 PM 1:00 PM 1:30 PM 2:00 PM 2:30 PM 3:00 PM 3:30 PM 4:00 PM 4:30 PM 5:00 PM 5:30 PM 6:00 PM 6:30 PM 7:00 PM 7:30 PM 8:00 PM 8:30 PM 9:00 PM 9:30 PM 10:00 PM 10:30 PM 11:00 PM 11:30 PM Registration Forrestal Bldg (DOE) Cafeteria National Mall Team/Organizer meeting and Safety Orientation Thurs, Sept 29 12:00 AM 12:30 AM 1:00 AM 1:30 AM 2:00 AM 2:30 AM 3:00 AM 3:30 AM 4:00 AM 4:30 AM 5:00 AM 5:30 AM 6:00 AM 6:30 AM 7:00

380

SOCO-1-E Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1-E Wholesale Power Rate Schedule 1-E Wholesale Power Rate Schedule SOCO-1-E Wholesale Power Rate Schedule Area: AMEA, Unaffil AL Munis and Coops, Hampton, East Miss., SMEPA off-System System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, and Florida to whom power may be transmitted and scheduled pursuant to contracts between the Government and Southern Company Services, Incorporated (hereinafter called the Company) and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F.

Note: This page contains sample records for the topic "ring status schedules" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

NC-1-B Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

NC-1-B Wholesale Power Rate Schedule NC-1-B Wholesale Power Rate Schedule NC-1-B Wholesale Power Rate Schedule Area: Virginia Power/CP&L System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina to whom power may be transmitted pursuant to a contract between the Government and Virginia Electric and Power Company (hereinafter called the Virginia Power) and PJM Interconnection LLC (hereinafter called PJM), scheduled pursuant to a contract between the Government and Carolina Power & Light Company (hereinafter called CP&L), and billed pursuant to contracts between the Government and the Customer. This rate schedule shall be applicable to the sale at wholesale of power

382

VA-4-B Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4-B Wholesale Power Rate Schedule 4-B Wholesale Power Rate Schedule VA-4-B Wholesale Power Rate Schedule Area: Virginia Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina served through the transmission facilities of Virginia Electric and Power Company (hereinafter called the Company) and PJM Interconnection LLC (hereinafter called PJM). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects (hereinafter called the Projects) and sold under appropriate contracts between the Government and the Customer. Document Available for Download VA-4-B Rate Schedule More Documents & Publications

383

Descriptions of Task Order Schedules and Placement of Pricing Information  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

RFP DE-RP36-06GO96031 RFP DE-RP36-06GO96031 10/11/2007 ATTACHMENT J-5 DESCRIPTIONS OF TASK ORDER SCHEDULES AND PLACEMENT OF PRICING INFORMATION J-5.1 DESCRIPTIONS OF TASK ORDER (TO) SCHEDULES (SCHEDULE TEMPLATES ARE PROVIDED IN ATTACHMENT J-6) J-5.1.1 Schedule TO-1 (Preliminary Assessment - PA) - Proposed Guaranteed Cost Savings and Contractor Payments - Schedule TO-1 (PA) shall be submitted to present the contractor's estimated cost savings, proposed guaranteed cost savings, and contractor payments. TO-1 (PA) values submitted may be in estimated ranges. Based on the preliminary survey and agency discussions, the contractor shall submit a completed Schedule TO-1 (PA) containing: A. Column (a) - Contractor submits proposed estimated cost savings during the implementation period, prior to full project acceptance (see most recent version

384

MISS-1-N Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

MISS-1-N Wholesale Power Rate Schedule MISS-1-N Wholesale Power Rate Schedule MISS-1-N Wholesale Power Rate Schedule Area: South Mississippi Electric Power Association System: Georgia-Alabama-South Carolina This rate schedule shall be available to the South Mississippi Electric Power Association (hereinafter called the Customer) to whom power may be wheeled pursuant to contracts between the Government and PowerSouth Energy Cooperative (hereinafter called PowerSouth). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does

385

SOCO-3-E Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3-E Wholesale Power Rate Schedule 3-E Wholesale Power Rate Schedule SOCO-3-E Wholesale Power Rate Schedule Area: MEAG, Dalton System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, and Florida to whom power may be scheduled pursuant to contracts between the Government and Southern Company Services, Incorporated (hereinafter called the Company) and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects (hereinafter referred to collectively as the Projects) and sold under appropriate contracts between

386

AP-4-B Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4-B Wholesale Power Rate Schedule 4-B Wholesale Power Rate Schedule AP-4-B Wholesale Power Rate Schedule Area: American Electric Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia served through the facilities of American Electric Power Service Corporation (hereinafter called the Company) and PJM Interconnection LLC (hereinafter called PJM). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects (hereinafter called the Projects) and sold under appropriate contracts between the Government and the Customer. Document Available for Download AP-4-B Rate Schedule More Documents & Publications

387

Replacement-2-A Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2-A Wholesale Power Rate Schedule 2-A Wholesale Power Rate Schedule Replacement-2-A Wholesale Power Rate Schedule Area: Replacement Energy System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and Virginia to whom power is provided pursuant to contracts between the Government and the customer from the John H. Kerr and Philpott Projects (or Kerr-Philpott System). This rate schedule shall be applicable to the sale of wholesale energy purchased to meet contract minimum energy and sold under appropriate contracts between the Government and the Customer. Document Available for Download Replacement-2-A Rate Schedule More Documents & Publications Southeastern Power Administration 2010 Annual Report

388

AP-3-B Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3-B Wholesale Power Rate Schedule 3-B Wholesale Power Rate Schedule AP-3-B Wholesale Power Rate Schedule Area: American Electric Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia to whom power may be scheduled pursuant to contracts between the Government, American Electric Power Service Corporation (hereinafter called the Company), PJM Interconnection LLC (hereinafter called PJM), and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects (hereinafter called the Projects) and sold under appropriate contracts between the Government and the Customer. Document Available for Download

389

Santee-4-E Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4-E Wholesale Power Rate Schedule 4-E Wholesale Power Rate Schedule Santee-4-E Wholesale Power Rate Schedule Area: Santee-Cooper System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter call the Customer) in South Carolina served through the transmission facilities of South Carolina Public Service Authority (hereinafter called the Authority). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does not apply to energy from pumping operations at the Carters and Richard B.

390

Descriptions of Task Order Schedules and Placement of Pricing Information  

Broader source: Energy.gov (indexed) [DOE]

RFP DE-RP36-06GO96031 RFP DE-RP36-06GO96031 10/11/2007 ATTACHMENT J-5 DESCRIPTIONS OF TASK ORDER SCHEDULES AND PLACEMENT OF PRICING INFORMATION J-5.1 DESCRIPTIONS OF TASK ORDER (TO) SCHEDULES (SCHEDULE TEMPLATES ARE PROVIDED IN ATTACHMENT J-6) J-5.1.1 Schedule TO-1 (Preliminary Assessment - PA) - Proposed Guaranteed Cost Savings and Contractor Payments - Schedule TO-1 (PA) shall be submitted to present the contractor's estimated cost savings, proposed guaranteed cost savings, and contractor payments. TO-1 (PA) values submitted may be in estimated ranges. Based on the preliminary survey and agency discussions, the contractor shall submit a completed Schedule TO-1 (PA) containing: A. Column (a) - Contractor submits proposed estimated cost savings during the implementation period, prior to full project acceptance (see most recent version

391

Duke-3-E Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3-E Wholesale Power Rate Schedule 3-E Wholesale Power Rate Schedule Duke-3-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina to whom power may be scheduled pursuant to contracts between the Government and Duke Energy Company (hereinafter called the Company) and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer.

392

Duke-2-E Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2-E Wholesale Power Rate Schedule 2-E Wholesale Power Rate Schedule Duke-2-E Wholesale Power Rate Schedule Area: Central System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina to whom power may be transmitted pursuant to contracts between the Government and Duke Energy Company (hereinafter called the Company) and the Customer. The Customer is responsible for providing a scheduling arrangement with the Government. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate

393

Santee-2-E Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2-E Wholesale Power Rate Schedule 2-E Wholesale Power Rate Schedule Santee-2-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter call the Customer) in South Carolina to whom power may be wheeled pursuant to contracts between the Government and South Carolina Public Service Authority (hereinafter called the Authority). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does

394

SOCO-1-E Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

SOCO-1-E Wholesale Power Rate Schedule SOCO-1-E Wholesale Power Rate Schedule SOCO-1-E Wholesale Power Rate Schedule Area: AMEA, Unaffil AL Munis and Coops, Hampton, East Miss., SMEPA off-System System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, and Florida to whom power may be transmitted and scheduled pursuant to contracts between the Government and Southern Company Services, Incorporated (hereinafter called the Company) and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F.

395

AP-1-B Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1-B Wholesale Power Rate Schedule 1-B Wholesale Power Rate Schedule AP-1-B Wholesale Power Rate Schedule Area: American Electric Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia to whom power may be transmitted and scheduled pursuant to contracts between the Government, American Electric Power Service Corporation (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects and sold under appropriate contracts between the Government and the Customer.

396

CTVI-1-A Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

CTVI-1-A Wholesale Power Rate Schedule CTVI-1-A Wholesale Power Rate Schedule CTVI-1-A Wholesale Power Rate Schedule Area: Former customers of TVA System: Cumberland This rate schedule shall be available to customers (hereinafter called the Customer) who are or were formerly in the Tennessee Valley Authority (hereinafter called TVA) service area. This rate schedule shall be applicable to electric capacity and energy generated at the Dale Hollow, Center Hill, Wolf Creek, Old Hickory, Cheatham, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereafter called collectively the "Cumberland Projects") and the Laurel Project sold under agreement between the Department of Energy and the Customer. Document Available for Download CTVI-1-A Rate Schedule More Documents & Publications

397

Dissociative recombination: Results from storage rings  

SciTech Connect (OSTI)

The focus of this article is on the measurement of product branching ratios in the dissociative recombination of polyatomic molecular ions with electrons by means of ion storage rings. Recombination of ions of interest in astrophysics, plasma-assisted combustion, thermonuclear fusion, protein fragmentation, and atmospheric physics are reviewed and discussed.

Larsson, Mats [Department of Physics, AlbaNova, Stockholm University, Stockholm, SE-106 91 (Sweden)

2005-05-27T23:59:59.000Z

398

Correction magnets for the Fermilab Recycler Ring  

SciTech Connect (OSTI)

In the commissioning of the Fermilab Recycler ring the need for higher order corrector magnets in the regions near beam transfers was discovered. Three types of permanent magnet skew quadrupoles, and two types of permanent magnet sextupoles were designed and built. This paper describes the need for these magnets, the design, assembly, and magnetic measurements.

James T Volk et al.

2003-05-27T23:59:59.000Z

399

Knot localization in adsorbing polymer rings  

E-Print Network [OSTI]

We study by Monte Carlo simulations a model of knotted polymer ring adsorbing onto an impenetrable, attractive wall. The polymer is described by a self-avoiding polygon (SAP) on the cubic lattice. We find that the adsorption transition temperature, the crossover exponent $\\phi$ and the metric exponent $\

B. Marcone; E. Orlandini; A. L. Stella

2007-09-10T23:59:59.000Z

400

Persistent Currents in Normal Metal Rings  

Science Journals Connector (OSTI)

...C) the 793-nm array for T = 323 mK, {theta} = 6; and (D) the 418-nm ring for 365 mK, {theta} = 45. In each case, a smooth...using measurements of the PC to search for ultralow temperature phase transitions (6...

A. C. Bleszynski-Jayich; W. E. Shanks; B. Peaudecerf; E. Ginossar; F. von Oppen; L. Glazman; J. G. E. Harris

2009-10-09T23:59:59.000Z

Note: This page contains sample records for the topic "ring status schedules" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

RF SYSTEM FOR THE SNS ACCUMULATOR RING.  

SciTech Connect (OSTI)

During accumulation the RF beam current in the spallation neutron source ring rises from 0 to 50 amperes. A clean, 250 nanosecond gap is needed for the extraction kicker risetime. Large momentum spread and small peak current are needed to prevent instabilities and stopband related losses. A robust RF system meeting these requirements has been designed.

BLASKIEWICZ, M.; BRENNAN, J.M.; BRODOWSKI, J.; DELONG, J.; METH, M.; SMITH, K.; ZALTSMAN, A.

2001-06-18T23:59:59.000Z

402

APS Long Range Operations Schedule FY2010  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

10) 10) Alternate Formats: iCal | Excel | PDF APS Long-Range Operation Schedule 2009-3 2010-1 2010-2 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5

403

APS Long Range Operations Schedule FY2009  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

09) 09) Alternate Formats: iCal | Excel | PDF APS Long Range Operation Schedule (FY2009) 2008-3 2009-1 2009-2 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5

404

Interaction Region Design for a Ring-Ring LHeC  

E-Print Network [OSTI]

tively low energy and moderately high intensity provides high luminosity TeV-scale e-p collisions at one of the LHC interaction points, running simultaneously with existing experiments. Two designs are studied; an electron ring situated in the LHC tunnel, and an electron linac. The focus of this paper is on the ring design. Designing an e-p machine presents interesting accelerator physics and design challenges, particularly when considering the interaction region. These include coupled optics, beam separation and unconventional mini-beta focusing schemes. Designs are constrained by an array of interdependent factors, including beam-beam interaction, detector dimensions and acceptance, luminosity and synchrotron radiation. Methods of addressing these complex issues are discussed. The current designs for the LHeC Ring-Ring interaction region and long straight section are presented and discussed, in the context of the project goals and design challenges encountered. Future developments and work are also discusse...

Thompson, L N S; Bernard, N R; Fitterer, M; Holzer, B; Klein, M; Kostka, P

2011-01-01T23:59:59.000Z

405

Optimal investment and scheduling of distributed energy resources with  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

investment and scheduling of distributed energy resources with investment and scheduling of distributed energy resources with uncertainty in electric vehicles driving schedules Title Optimal investment and scheduling of distributed energy resources with uncertainty in electric vehicles driving schedules Publication Type Journal Article LBNL Report Number LBNL-6471E Year of Publication 2013 Authors Cardoso, Gonçalo, Michael Stadler, Mohammad Bozchalui, Ratnesh Sharma, Chris Marnay, Ana Barbosa-Póvoa, and Paulo Ferrão Journal Energy Date Published 10/2013 Abstract The large scale penetration of electric vehicles (EVs) will introduce technical challenges to the distribution grid, but also carries the potential for vehicle-to-grid services. Namely, if available in large enough numbers, EVs can be used as a distributed energy resource (DER) and their presence can influence optimal DER investment and scheduling decisions in microgrids. In this work, a novel EV fleet aggregator model is introduced in a stochastic formulation of DER-CAM [1], an optimization tool used to address DER investment and scheduling problems. This is used to assess the impact of EV interconnections on optimal DER solutions considering uncertainty in EV driving schedules. Optimization results indicate that EVs can have a significant impact on DER investments, particularly if considering short payback periods. Furthermore, results suggest that uncertainty in driving schedules carries little significance to total energy costs, which is corroborated by results obtained using the stochastic formulation of the problem.

406

Water pollution Control Permit Fee Schedules (West Virginia) | Department  

Broader source: Energy.gov (indexed) [DOE]

pollution Control Permit Fee Schedules (West Virginia) pollution Control Permit Fee Schedules (West Virginia) Water pollution Control Permit Fee Schedules (West Virginia) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State West Virginia Program Type Fees Siting and Permitting Provider Department of Environmental Protection This rule establishes schedules of permit application fees and annual permit fees for state water pollution control permits and national

407

MIT Plasma Science & Fusion left: research>alctor>meetings scheduled  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of larger Directory of Plasma Conferences list with some additions (see also the Nuclear Fusion calendar). ITPA meetings schedule Fusion meetings calendars Conference, Workshop,...

408

Simulation Optimization for the Stochastic Economic Lot Scheduling ...  

E-Print Network [OSTI]

constant functions as well as control policies that can be described by a small set ... We address the problem of scheduling production of multiple products on a...

2012-01-12T23:59:59.000Z

409

Simulation Optimization for the Stochastic Economic Lot Scheduling ...  

E-Print Network [OSTI]

The integration of lot-sizing, scheduling and safety stock planning is a major challenge in multi- product inventory .... Generic policy search for production control.

2014-03-31T23:59:59.000Z

410

Scheduling co-operating stacking cranes with predetermined ...  

E-Print Network [OSTI]

Nov 7, 2011 ... Crane scheduling in container terminals is known as a difficult optimization problem .... an overview focussing on design and control issues.

2011-11-19T23:59:59.000Z

411

Oversight Scheduling and Operational Awareness at the Savannah...  

Office of Environmental Management (EM)

Office of Safety and Emergency Management Evaluations Activity Report on Oversight Scheduling and Operational Awareness at the Savannah River Site Dates of Activity : 0325...

412

Optimization Online - Fast Approximations for Online Scheduling of ...  

E-Print Network [OSTI]

Jun 19, 2014 ... Fast Approximations for Online Scheduling of Outpatient Procedure Centers. Berg(bberg2 ***at*** gmu.edu) Denton(btdenton ***at***...

Berg

2014-06-19T23:59:59.000Z

413

FLEX TIME (ALTERNATIVE WORK SCHEDULE) REQUEST EMPLOYEE INFORMATION  

E-Print Network [OSTI]

(Hours) Proposed Alternative Work Schedule (Hours) Days On-Site Off-Site On-Site Off-Site Monday Tuesday

Dasgupta, Dipankar

414

National Labs Commission Phase I Public Schedule | Department...  

Broader source: Energy.gov (indexed) [DOE]

National Labs Commission Phase I Public Schedule More Documents & Publications Hydrogen Generator Appliance Natural Gas and Hydrogen Infrastructure Opportunities Workshop Agenda...

415

Single-Machine Two-Agent Scheduling Problems with ...  

E-Print Network [OSTI]

Jan 24, 2014 ... Abstract: We address a class of deterministic scheduling problems in which two agents compete for the usage of a single machine. The agents...

Gaia Nicosia

2014-01-24T23:59:59.000Z

416

A hybrid Lagrangean metaheuristic for single machine scheduling ...  

E-Print Network [OSTI]

Aug 8, 2014 ... A hybrid Lagrangean metaheuristic for single machine scheduling problem with sequence-dependent setup times and due dates.

Thiago Henrique Nogueira

2014-08-08T23:59:59.000Z

417

Parallel machine match-up scheduling with manufacturing cost considerations  

E-Print Network [OSTI]

decisions on parallel CNC machines: -constraint approach.bounding mechanism for the CNC machine scheduling problemsprocessing times is the CNC turning operation where

Aktrk, M. Selim; Atamtrk, Alper; Grel, Sinan

2010-01-01T23:59:59.000Z

418

ADMINISTRATIVE RECORDS SCHEDULE 3: PROCUREMENT, SUPPLY, AND GRANT...  

Broader source: Energy.gov (indexed) [DOE]

3: PROCUREMENT, SUPPLY, AND GRANT RECORDS ADMINISTRATIVE RECORDS SCHEDULE 3: PROCUREMENT, SUPPLY, AND GRANT RECORDS The basic procurement files reflect a considerable range of...

419

Flow Shop Scheduling with Peak Power Consumption Constraints  

E-Print Network [OSTI]

To conduct our experiments, we considered a hypothetical flow shop scheduling ... There are two types of machines with different operations: face milling. 16...

2012-09-23T23:59:59.000Z

420

Stochastic flow shop scheduling model for the Panama Canal.  

E-Print Network [OSTI]

??The Panama Canal can be modeled as a stochastic flexible flow shop for the purpose of scheduling. A metaheuristic stochastic optimization method (Nested Partition) was (more)

de Castillo, Zoila Yadira Guerra

2006-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "ring status schedules" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Optimization Online - Stochastic Real-Time Scheduling of Wind ...  

E-Print Network [OSTI]

Jan 3, 2015 ... Stochastic Real-Time Scheduling of Wind-thermal Generation Units in ... Keywords: conditional value at risk, uncertainty modeling, wind energy.

Alireza Soroudi

2015-01-03T23:59:59.000Z

422

ADMINISTRATIVE RECORDS SCHEDULE 2: PAYROLL AND PAY ADMINISTRATION...  

Broader source: Energy.gov (indexed) [DOE]

: PAYROLL AND PAY ADMINISTRATION RECORDS ADMINISTRATIVE RECORDS SCHEDULE 2: PAYROLL AND PAY ADMINISTRATION RECORDS Payrolling and pay administration records pertain to the...

423

ADMINISTRATIVE RECORDS SCHEDULE 2: PAYROLL AND PAY ADMINISTRATION...  

Broader source: Energy.gov (indexed) [DOE]

2: PAYROLL AND PAY ADMINISTRATION RECORDS-Revision 2 ADMINISTRATIVE RECORDS SCHEDULE 2: PAYROLL AND PAY ADMINISTRATION RECORDS-Revision 2 Payrolling and pay administration records...

424

Annual Hanford Site environmental permitting status report  

SciTech Connect (OSTI)

The information contained and/or referenced in this Annual Hanford Site Environmental Permitting Status Report (Status Report) addresses the State Environmental Policy Act (SEPA) of 1971 and Condition II.W. of the Resource Conservation and Recovery Act (RCRA) of 1976 Permit, Dangerous Waste Portion (DW Portion). Condition II.W. of the RCRA Permit specifies the Permittees are responsible for all other applicable federal, state, and local permits for the development and operation of the Hanford Facility. Condition II.W. of the RCRA Permit specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of permit condition, `best efforts` means submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies. This Status Report includes information on all existing and anticipated environmental permitting. Environmental permitting required by RCRA, the Hazardous and Solid Waste Amendments (HSWA) of 1984, and non-RCRA permitting (solid waste handling, Clean Air Act Amendments of 1990, Clean Water Act Amendments of 1987, Washington State waste discharge, and onsite sewage system) is addressed. Information on RCRA and non-RCRA is current as of July 31, 1998. For the purposes of RCRA and the State of Washington Hazardous Waste Management Act of 1976 [as administered through the Dangerous Waste Regulations, Washington Active Code (WAC) 173-303], the Hanford Facility is considered a single facility. As such, the Hanford Facility has been issued one US Environmental Protection Agency (EPA)/State Identification Number (WA7890008967). This EPA/State identification number encompasses over 60 treatment, storage, and/or disposal (TSD) units. The Washington State Department of Ecology (Ecology) has been delegated authority by the EPA to administer the RCRA, including mixed waste authority. The RCRA permitting approach for the Hanford Facility is addressed in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). Pursuant to the Tri-Party Agreement, a single RCRA permit was issued by Ecology and the EPA to cover the Hanford Facility. The RCRA Permit, through the permit modification process, eventually will incorporate all TSD units.

Sonnichsen, J.C.

1998-09-17T23:59:59.000Z

425

RingCentral User Guide | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

called RingCentral. RingCentral User Guide Responsible Contacts Bruce Murray HR Policy Advisor E-mail bruce.murray@hq.doe.gov Phone 202-586-3372 More Documents & Publications US...

426

APS Long Range Schedule FY1997  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7 Beamline Operations Schedule 7 Beamline Operations Schedule January Monday Tuesday Wednesday Thursday Friday Saturday Sunday 6 7 8 9 10 11 12 00:00-08:00 MS MS UO UO UO UO UO 08:00-16:00 MS UO UO UO SV UO UO 16:00-24:00 MS UO UO UO UO UO UO 13 14 15 16 17 18 19 00:00-08:00 UO UO UO UO UO MS MS 08:00-16:00 UO SV SV Contingency UO MS MS MS 16:00-24:00 UO UO UO UO MS MS MS 20 21 22 23 24 25 26 00:00-08:00 MS UO UO UO UO UO MS 08:00-16:00 UO UO SV Contingency UO UO MS MS 16:00-24:00 UO UO UO UO UO MS MS 27 28 29 30 31 1 2 00:00-08:00 MS SM SM SM SM SM SM 08:00-16:00 MS SM SM SM SM SM SM 16:00-24:00 MS SM SM SM SM SM SM FEB Monday Tuesday Wednesday Thursday Friday Saturday Sunday

427

APS Long Range Schedule FY1998  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

8 Beamline Operations Schedule 8 Beamline Operations Schedule JAN Monday Tuesday Wednesday Thursday Friday Saturday Sunday Week 1 5 6 7 8 9 10 11 0000 - 0800 SM SM SM MS MS MS MS 0800 - 1600 SM SM* MS MS MS MS MS 1600 - 2400 SM SM MS MS MS MS MS Week 2 12 13 14 15 16 17 18 0000 - 0800 MS MS UO UO UO UO UO 0800 - 1600 MS* UO UO UO UO UO UO 1600 - 2400 MS UO UO UO UO UO UO Week 3 19 20 21 22 23 24 25 0000 - 0800 UO MS UO UO UO UO UO 0800 - 1600 MS UO UO UO UO UO UO 1600 - 2400 MS UO UO UO UO UO UO JAN/FEB 26 27 28 29 30 31 1 0000 - 0800 UO MS UO UO UO UO UO 0800 - 1600 MS SOM UO UO UO UO UO 1600 - 2400 MS UO UO UO UO UO UO Week 5 2 3 4 5 6 7 8 0000 - 0800 UO MS UO UO UO UO UO

428

APS Long Range Schedule FY1999  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

9 Beamline Operations Schedule 9 Beamline Operations Schedule JAN Monday Tuesday Wednesday Thursday Friday Saturday Sunday Week 1 18 19 20 21 22 23 24 0000 - 0800 MS MS MS MS UO UO UO 0800 - 1600 MS MS MS UO UO UO UO 1600 - 2400 MS MS MS UO UO UO UO Week 2 25 26 27 28 29 30 31 0000 - 0800 UO UO UO UO UO UO UO 0800 - 1600 UO MS UO UO UO UO UO 1600 - 2400 UO UO UO UO UO UO UO FEB 1 2 3 4 5 6 7 0000 - 0800 UO MS MS UO UO UO UO 0800 - 1600 MS MS UO UO UO UO UO 1600 - 2400 MS MS UO UO UO UO UO Week 4 8 9 10 11 12 13 14 0000 - 0800 UO UO UO UO UO UO UO 0800 - 1600 UO MS UO UO* UO UO UO 1600 - 2400 UO UO UO UO UO UO UO Week 5 15 16 17 18 19 20 21 0000 - 0800 UO MS MS UO UO U O UO

429

APS Long Range Schedule FY1996  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Long Range Commissioning Schedule for FY1996 Long Range Commissioning Schedule for FY1996 Date First Shift 0:00-8:00 Second Shift 8:00-16:00 Third Shift 16:00-24:00 3/15/96 SR Studies 1-ID-A Shielding Verification SR Studies 3/23/96 SR Studies 3-ID-A , 2-ID-A , 3-ID-B Shielding Verifications User Beam 3/24/96 User Beam User Beam User Beam 3/25/96 User Beam 19-ID-A Shielding Verification User Beam 3/26/96 User Beam 2-ID-A , 12-BM-A Shielding Verifications User Beam 3/27/96 User Beam 5-BM-A Shielding Verification User Beam 3/28/96 User Beam 19-ID-C Shielding Verification User Beam until 20:00 3/29/96 SR Studies SR Studies SR Studies 3/30/96 SR Studies SR Studies SR Studies 3/31/96 SR Studies SR Studies SR Studies 4/1/96 SR Studies SR Studies SR Studies 4/2/96 SR Studies 5-BM-B Shielding Verification User Beam

430

Hanford Site Environmental Surveillance Master Sampling Schedule  

SciTech Connect (OSTI)

Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, ''General Environmental protection Program,'' and DOE Order 5400.5, ''Radiation Protection of the Public and the Environment.'' The sampling methods are described in the Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office, DOE/RL-91-50, Rev.2, U.S. Department of Energy, Richland, Washington. This document contains the CY1999 schedules for the routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section includes the sampling location, sample type, and analyses to be performed on the sample. In some cases, samples are scheduled on a rotating basis and may not be collected in 1999 in which case the anticipated year for collection is provided. In addition, a map is included for each media showing approximate sampling locations.

LE Bisping

1999-02-12T23:59:59.000Z

431

Weekly Natural Gas Storage Report Schedule  

U.S. Energy Information Administration (EIA) Indexed Site

‹ Weekly Natural Gas Storage Report ‹ Weekly Natural Gas Storage Report Weekly Natural Gas Storage Report Schedule Holiday Release Schedule The standard release time and day of the week will be at 10:30 a.m. (Eastern time) on Thursdays with the following exceptions. All times are Eastern. Alternate Release Date Release Day Release Time Holiday 7/6/2012 Friday 10:30 a.m. 7/4/2012 (Wednesday) is Independence Day 11/21/2012 Wednesday 12:00 p.m. 11/22/2012 (Thursday) is Thanksgiving Day 12/28/2012 Friday 10:30 a.m. 12/25/2012 (Tuesday) is Christmas Day 1/4/2013 Friday 10:30 a.m. 1/1/2013 (Tuesday) is New Year's Day 7/3/2013 Wednesday 12:00 p.m. 7/4/2013 (Thursday) is Independence Day 10/22/2013 Tuesday 10:30 a.m. EIA Closed 11/27/2013 Wednesday 12:00 p.m. 11/28/2013 (Thursday) is Thanksgiving Day

432

Gas insulated transmission line having tapered particle trapping ring  

DOE Patents [OSTI]

A gas-insulated transmission line includes an outer sheath, an inner conductor, insulating supports and an insulating gas. A particle-trapping ring is secured to each insulating support, and it is comprised of a central portion and two tapered end portions. The ends of the particle trapping ring have a smaller diameter than the central portion of the ring, so as to enable the use of the particle trapping ring in a curved transmission line.

Cookson, Alan H. (Pittsburgh, PA)

1982-01-01T23:59:59.000Z

433

Transient injection-locking of an unstable ring dye laser  

SciTech Connect (OSTI)

The transient injection-locking properties of an unstable ring resonator dye laser have been investigated. When a narrow line optical pulse was injected into the ring resonator, the energy emitted from the ring increased and the lasing spectrum narrowed to that of the injected pulse. However, the polarization control of the emitted radiation was incomplete.

Harris, D.G.; Waite, T.R.; Holmes, D.A. (Rockwell International, Rocketdyne Division, Canoga Park, California 91303 (USA))

1990-04-20T23:59:59.000Z

434

Study of CMOS APS Responsivity Enhancement: Ring-Shaped Photodiode  

E-Print Network [OSTI]

Study of CMOS APS Responsivity Enhancement: Ring-Shaped Photodiode Tatiana Danov, Igor Shcherback obtained from various ring-shaped pixel photodiodes with different inner radius, implemented in a standard illumination. We show that the photodiodes with a small ring-opening exhibit better sensitivity in the blue

435

M57 Ring Nebulae M57 -The famously named "Ring Nebula" is located in the northern constellation of Lyra, and  

E-Print Network [OSTI]

M57 ­ Ring Nebulae M57 - The famously named "Ring Nebula" is located in the northern constellation by ultraviolet energy from the central star. _ _ _ _ _ _ Credits: Wikpedia; NASA/SCSTi/AURA #12;

436

A coupled model for ring dynamics, gas flow, and oil flow through the ring grooves in IC engines  

E-Print Network [OSTI]

Oil flows through ring/groove interface play a critical role in oil transport among different regions the piston ring pack of internal combustion engines. This thesis work is intended to improve the understanding and ...

Jia, Ke, S. M. Massachusetts Institute of Technology

2009-01-01T23:59:59.000Z

437

Fuel Cell Development Status  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Development Status Michael Short Systems Engineering Manager United Technologies Corporation Research Center Hamilton Sundstrand UTC Power UTC Fire & Security Fortune 50 corporation $52.9B in annual sales in 2009 ~60% of Sales are in building technologies Transportation Stationary Fuel Cells Space & Defense * Fuel cell technology leader since 1958 * ~ 550 employees * 768+ Active U.S. patents, more than 300 additional U.S. patents pending * Global leader in efficient, reliable, and sustainable fuel cell solutions UTC Power About Us PureCell ® Model 400 Solution Process Overview Power Conditioner Converts DC power to high-quality AC power 3 Fuel Cell Stack Generates DC power from hydrogen and air 2 Fuel Processor Converts natural gas fuel to hydrogen

438

DFC Technology Status  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Pinakin Patel Pinakin Patel Mohammad Farooque FuelCell Energy, Inc. 3 Great Pasture Road Danbury, Ct 06813 DFC Technology Status * Distributed generation puts power where it's needed * Increases power reliability * Near zero emissions allow units to be sited almost anywhere - even polluted urban areas * Reduces need for central generation plants * Reduces grid congestion and need for new transmission lines * Distributed generation enables smart grid * Balances the grid with 24/7 power * Meets requirements for low carbon technology * Smaller projects enable faster permitting, financing, and execution DFC power plant is an enabler for broad distributed generation 600 kW at M&L Commodities Distributed Generation FuelCell Energy Products Fuel Cell Stack DFC300 Single Module

439

RIA Overview and Status  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Office of Science Office of Science U.S. Department of Energy Guy Savard Argonne National Laboratory & University of Chicago Based on Material presented at the ATLAS Operation's Review December 8-10, 2003 by The Californium Source Upgrade 2 Pioneering Science and Technology Office of Science U.S. Department of Energy 12/8-10/2003 ATLAS Upgrade Guy Savard ATLAS Status * ATLAS only low-energy accelerator for stable ions operating as a User Facility with well documented characteristics (reliability, beam quality, transmission, timing,...) * Excellent and varied physics program with a large User community * What lies ahead for ATLAS * Maintain position as premier low-energy heavy ion accelerator * Address open physics/technical questions leading to RIA * Help the community in the "pre-RIA"

440

Mass and Lifetime Measurements in Storage Rings  

SciTech Connect (OSTI)

Masses of nuclides covering a large area of the chart of nuclides can be measured in storage rings where many ions circulate at the same time. In this paper the recent progress in the analysis of Schottky mass spectrometry data is presented as well as the technical improvements leading to higher accuracy for isochronous mass measurements with a time-of-flight detector. The high sensitivity of the Schottky method down to single ions allows to measure lifetimes of nuclides by observing mother and daughter nucleus simultaneously. In this way we investigated the decay of bare and H-like 140Pr. As we could show the lifetime can be even shortened compared to those of atomic nuclei despite of a lower number of electrons available for internal conversion or electron capture.All these techniques will be implemented with further improvements at the storage rings of the new FAIR facility at GSI in the future.

Weick, H.; Beckert, K.; Beller, P.; Bosch, F.; Dimopoulou, C.; Kozhuharov, C.; Kurcewicz, J.; Mazzocco, M.; Nociforo, C.; Nolden, F.; Steck, M.; Sun, B.; Winkler, M. [Gesellschaft fuer Schwerionenforschung mbH, 64291 Darmstadt (Germany); Brandau, C.; Chen, L.; Geissel, H.; Knoebel, R.; Litvinov, S. A.; Litvinov, Yu. A.; Scheidenberger, C. [Gesellschaft fuer Schwerionenforschung mbH, 64291 Darmstadt (Germany); II. Phys. Institut, Justus-Liebig-Universitaet Giessen, 35392 Giessen (Germany)] (and others)

2007-05-22T23:59:59.000Z

Note: This page contains sample records for the topic "ring status schedules" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Sediment resuspension and erosion by vortex rings  

Science Journals Connector (OSTI)

Particle resuspension and erosion induced by a vortex ringinteracting with a sediment layer was investigated experimentally using flow visualization (particle image velocimetry) high-speed video and a recently developed light attenuation method for measuring displacements in bed level. Near-spherical sediment particles were used throughout with relative densities of 1.27 and diameters ( d ) ranging between 90 and 1600 ? ? m . Attention was focused on initially smooth horizontal bedforms with the vortex ring aligned to approach the bed vertically. Interaction characteristics were investigated in terms of the dimensionless Shields parameter defined using the vortex-ring propagation speed. The critical conditions for resuspension (whereby particles are only just resuspended) were determined as a function of particle Reynolds number (based on the particle settling velocity and d ). The effects of viscous damping were found to be significant for d / ? resuspension volumes are analyzed as a function interaction time impact condition and sediment size.

R. J. Munro; N. Bethke; S. B. Dalziel

2009-01-01T23:59:59.000Z

442

Monopole-Antimonopole Chains and Vortex Rings  

E-Print Network [OSTI]

We consider static axially symmetric solutions of SU(2) Yang-Mills-Higgs theory. The simplest such solutions represent monopoles, multimonopoles and monopole-antimonopole pairs. In general such solutions are characterized by two integers, the winding number m of their polar angle, and the winding number n of their azimuthal angle. For solutions with n=1 and n=2, the Higgs field vanishes at m isolated points along the symmetry axis, which are associated with the locations of m monopoles and antimonopoles of charge n. These solutions represent chains of m monopoles and antimonopoles in static equilibrium. For larger values of n, totally different configurations arise, where the Higgs field vanishes on one or more rings, centered around the symmetry axis. We discuss the properties of such monopole-antimonopole chains and vortex rings, in particular their energies and magnetic dipole moments, and we study the influence of a finite Higgs self-coupling constant on these solutions.

Burkhard Kleihaus; Jutta Kunz; Yasha Shnir

2004-05-19T23:59:59.000Z

443

2007 Solar Decathlon Detailed Event Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DETAILED EVENT SCHEDULE DETAILED EVENT SCHEDULE Last updated on September 14, 2007 Note: This schedule is subject to change at any time. 12:00 AM 12:30 AM 1:00 AM 1:30 AM 2:00 AM 2:30 AM 3:00 AM 3:30 AM 4:00 AM 4:30 AM 5:00 AM 5:30 AM 6:00 AM 6:30 AM 7:00 AM 7:30 AM 8:00 AM 8:30 AM 9:00 AM 9:30 AM 10:00 AM 10:30 AM 11:00 AM 11:30 AM 12:00 PM 12:30 PM 1:00 PM 1:30 PM 2:00 PM 2:30 PM 3:00 PM 3:30 PM 4:00 PM 4:30 PM 5:00 PM 5:30 PM 6:00 PM 6:30 PM 7:00 PM 7:30 PM 8:00 PM 8:30 PM 9:00 PM 9:30 PM 10:00 PM 10:30 PM 11:00 PM 11:30 PM 12:00 AM 12:30 AM 1:00 AM 1:30 AM 2:00 AM 2:30 AM 3:00 AM 3:30 AM 4:00 AM 4:30 AM 5:00 AM 5:30 AM 6:00 AM 6:30 AM 7:00 AM 7:30 AM 8:00 AM 8:30 AM 9:00 AM 9:30 AM 10:00 AM 10:30 AM 11:00 AM 11:30 AM 12:00 PM 12:30 PM 1:00 PM 1:30 PM 2:00 PM 2:30 PM 3:00 PM 3:30 PM 4:00 PM 4:30 PM 5:00 PM 5:30 PM 6:00 PM 6:30 PM 7:00 PM 7:30 PM 8:00

444

Optimal combined scheduling of generation and demand response with demand resource constraints  

Science Journals Connector (OSTI)

Demand response (DR) extends customer participation to power systems and results in a paradigm shift from simplex to interactive operation in power systems due to the advancement of smart grid technology. Therefore, it is important to model the customer characteristics in DR. This paper proposes customer information as the registration and participation information of DR, thus providing indices for evaluating customer response, such as DR magnitude, duration, frequency and marginal cost. The customer response characteristics are modeled from this information. This paper also introduces the new concept of virtual generation resources, whose marginal costs are calculated in the same manner as conventional generation marginal costs, according to customer information. Finally, some of the DR constraints are manipulated and expressed using the information modeled in this paper with various status flags. Optimal scheduling, combined with generation and DR, is proposed by minimizing the system operation cost, including generation and DR costs, with the generation and DR constraints developed in this paper.

Hyung-Geun Kwag; Jin-O Kim

2012-01-01T23:59:59.000Z

445

Module 4Module 4 CPU SchedulingCPU Scheduling Reading: Chapter 5Reading: Chapter 5Reading: Chapter 5Reading: Chapter 5  

E-Print Network [OSTI]

to execute, and then give the control to it If we want efficient resource utilization, we need CPU scheduling preemptive scheduling? DispatcherDispatcher Dispatcher module gives control of the CPU to the process1 Module 4Module 4 ­­ CPU SchedulingCPU Scheduling Reading: Chapter 5Reading: Chapter 5Reading

Stojmenovic, Ivan

446

: A Testbed for Empirically Comparing Real-Time Multiprocessor Schedulers  

E-Print Network [OSTI]

on M processors any pe- riodic task system with total utilization at most M [2], and the global-deadline-first (EDF) scheduling, pre- emptive and nonpreemptive global EDF scheduling, and two variants of the global-real-time constraints. To our knowledge, this paper is the first attempt by anyone to compare partitioned and global

Anderson, James

447

ORIE 6335: THE DESIGN & ANALYSIS OF SCHEDULING ALGORITHMS Spring 2009  

E-Print Network [OSTI]

of algorithms will be very useful. Course Requirements: There will be four to five problem sets; the last one. This course will cover the basic techniques in the design of efficient algorithms for scheduling problemsORIE 6335: THE DESIGN & ANALYSIS OF SCHEDULING ALGORITHMS Spring 2009 Instructor: David Shmoys

Keinan, Alon

448

Polynomial Time Algorithms for Minimum Energy Scheduling Philippe Baptiste1  

E-Print Network [OSTI]

algorithm for computing the minimum energy schedule when all jobs have unit length. 1 Introduction PowerPolynomial Time Algorithms for Minimum Energy Scheduling Philippe Baptiste1 , Marek Chrobak2 policies is to reduce the amount of energy consumed by computer systems while maintaining satisfactory

Chrobak, Marek

449

Optimizing Throughput and Energy in Online Deadline Scheduling  

E-Print Network [OSTI]

of all jobs. An optimal schedule is expected to maximize the throughput, and furthermore, its energy a scheduling algorithm, one has to face the dilemma of selecting more jobs and being conservative in energy jobs; O(1)-competitive online algorithms with respect to energy usage have been known [Yao et al. 1995

Wong, Prudence W.H.

450

Physics & Astronomy Open House Schedule UH Manoa Watanabe Hall  

E-Print Network [OSTI]

Physics & Astronomy Open House Schedule UH Manoa Watanabe Hall 22 November 2014 0830 - 1245 *** Physics & Astronomy info. available at www.phys.hawaii.edu *** Welcome & Overview: Prof. Pui Lam in Physical Science 217 at 0830 ** schedules for groups 1 to 10 below for 0900-1100 ** **solar observing

451

A behavior priority driven approach for resource reservation scheduling  

Science Journals Connector (OSTI)

In this paper a behavioral distinction of soft real-time tasks is introduced. The distinction is based on the behavior of the previous instance of each task and it is used to propose a scheduling algorithm. The algorithm, called BIDS, uses well-known ... Keywords: behavior, importance, real-time, scheduling, server

Leo Ordnez; David Donari; Rodrigo Santos

2008-03-01T23:59:59.000Z

452

Coordinated Hospital Patient Scheduling Keith Decker and Jinjiang Li  

E-Print Network [OSTI]

Coordinated Hospital Patient Scheduling Keith Decker and Jinjiang Li Department of Computer and Information Sciences University of Delaware (decker,jli)@cis.udel.edu Abstract Hospital Patient Scheduling is an inherently distributed problem because of the way real hospitals are organized. As medical procedures have

Decker, Keith S.

453

Single Machine Scheduling with a Non-renewable Financial Resource  

E-Print Network [OSTI]

Single Machine Scheduling with a Non-renewable Financial Resource Evgeny R. Gafarov a , Alexander A with a non-renewable resource. For example, money or fuel provide natural examples of such a non-renewable resource. Such problems with a non-renewable resource are also referred to as financial scheduling problems

Magdeburg, Universität

454

Incentivizing Advanced Load Scheduling in Smart Homes , and David Irwin  

E-Print Network [OSTI]

Incentivizing Advanced Load Scheduling in Smart Homes Ye Xu , and David Irwin , and Prashant Shenoy Department of Electrical and Computer Engineering School of Computer Science University of Massachusetts Amherst ABSTRACT In recent years, researchers have proposed numerous advanced load scheduling algorithms

Massachusetts at Amherst, University of

455

Iterative improvement to solve the parcel hub scheduling problem  

Science Journals Connector (OSTI)

This paper presents iterative improvement algorithms to solve the parcel hub scheduling problem (PHSP). The PHSP is combinatorial optimization problem that consists of scheduling a set of inbound trailers to a small number of unload docks. At the unload ... Keywords: Cross docks, Genetic algorithms, Local search, Parcel delivery industry, Simulated annealing

Douglas L. McWilliams

2010-08-01T23:59:59.000Z

456

POWER SCHEDULING IN A HYDROTHERMAL SYSTEM UNDER UNCERTAINTY  

E-Print Network [OSTI]

de­ composition. Numerical results are re­ ported for realistic data from a German power utility. Keywords: Power scheduling, uncertain elec­ trical load, stochastic Lagrangian decomposi­ tion, scenarioPOWER SCHEDULING IN A HYDRO­THERMAL SYSTEM UNDER UNCERTAINTY C.C. Carøe 1 , M.P. Nowak 2 , W. R

Römisch, Werner

457

A Meeting Scheduling System Based on Open Constraint Programming  

E-Print Network [OSTI]

- ences can be programmed using the OCP reactors language. CLP is suitable to be used in meetingA Meeting Scheduling System Based on Open Constraint Programming Kenny Qili Zhu and Andrew E a meeting scheduling system based on open constraint programming (OCP) paradigm. OCP is an extension

Zhu, Kenny Q.

458

Queue Prediction: an efficient scheduler for fast ATM cell transmission  

E-Print Network [OSTI]

Queue Prediction: an efficient scheduler for fast ATM cell transmission Peter Fenwick Department, if not impossible within the time constraints of fast ATM transmission (622 Mbps or higher). This paper presents a solution to this problem. By scheduling in advance the transmissions from queues it allows all output

Fenwick, Peter

459

GreenSlot: Scheduling Energy Consumption in Green Datacenters  

E-Print Network [OSTI]

GreenSlot: Scheduling Energy Consumption in Green Datacenters Íñigo Goiri UPC/BSC and Rutgers Univ grid (as a backup). GreenSlot predicts the amount of solar energy that will be available in the near future, and schedules the workload to maximize the green energy consumption while meet- ing the jobs

460

Renewable Energy Scheduling for Fading Channels with Maximum Power Constraint  

E-Print Network [OSTI]

Renewable Energy Scheduling for Fading Channels with Maximum Power Constraint Zhe Wang Electrical--In this paper, we develop efficient algorithm to obtain the optimal energy schedule for fading channel with energy harvesting. We assume that the side information of both the channel states and energy harvesting

Greenberg, Albert

Note: This page contains sample records for the topic "ring status schedules" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Smooth Inequalities and Equilibrium Inefficiency in Scheduling Games  

E-Print Network [OSTI]

, that permits to bal- ance overall quality of service and fairness. Our goal is to design schedul- ing policies that schedules the jobs non-preemptively in order of increasing processing times. We show that the price on Internet and Network Economics (WINE 2012), Liverpool : United Kingdom (2012)" DOI : 10

Paris-Sud XI, Université de

462

Performance evaluation of bound diamond ring tools  

SciTech Connect (OSTI)

LLNL is collaborating with the Center for Optics Manufacturing (COM) and the American Precision Optics Manufacturers Association (APOMA) to optimize bound diamond ring tools for the spherical generation of high quality optical surfaces. An important element of this work is establishing an experimentally-verified link between tooling properties and workpiece quality indicators such as roughness, subsurface damage and removal rate. In this paper, we report on a standardized methodology for assessing ring tool performance and its preliminary application to a set of commercially-available wheels. Our goals are to (1) assist optics manufacturers (users of the ring tools) in evaluating tools and in assessing their applicability for a given operation, and (2) provide performance feedback to wheel manufacturers to help optimize tooling for the optics industry. Our paper includes measurements of wheel performance for three 2-4 micron diamond bronze-bond wheels that were supplied by different manufacturers to nominally- identical specifications. Preliminary data suggests that the difference in performance levels among the wheels were small.

Piscotty, M.A.; Taylor, J.S.; Blaedel, K.L.

1995-07-14T23:59:59.000Z

463

Plan and schedule for disposition and regulatory compliance for miscellaneous streams. Revision 1  

SciTech Connect (OSTI)

On December 23, 1991, the U.S. Department of Energy, Richland Operations Office (RL) and the Washington State Department of Ecology (Ecology) agreed to adhere to the provisions of Department of Ecology Consent Order No. DE 91NM-177 (Consent Order). The Consent Order lists regulatory milestones for liquid effluent streams at the Hanford Site to comply with the permitting requirements of Washington Administrative Code (WAC) 173-216 (State Waste Discharge Permit Program) or WAC 173-218 (Washington Underground Injection Control Program) where applicable. Hanford Site liquid effluent streams discharging to the soil column have been categorized in the Consent Order as follows: Phase I Streams Phase II Streams Miscellaneous Streams. Phase I and Phase II Streams are addressed in two RL reports: {open_quotes}Plan and Schedule to Discontinue Disposal of Contaminated Liquids into the Soil Column at the Hanford Site{close_quotes} (DOE-RL 1987), and {open_quotes}Annual Status of the Report of the Plan and Schedule to Discontinue Disposal of Contaminated Liquids into the Soil Column at the Hanford Site{close_quotes}. Miscellaneous Streams are those liquid effluent streams discharged to the ground that are not categorized as Phase I or Phase II Streams. Miscellaneous Streams discharging to the soil column at the Hanford Site are subject to the requirements of several milestones identified in the Consent Order. This document provides a plan and schedule for the disposition of Miscellaneous Streams. The disposition process for the Miscellaneous Streams is facilitated using a decision tree format. The decision tree and corresponding analysis for determining appropriate disposition of these streams is presented in this document.

NONE

1994-12-01T23:59:59.000Z

464

NuSTORM {\\mu} Ring -- Design and Injection Optimization  

E-Print Network [OSTI]

The design of the NuSTORM muon production beam line and storage ring is discussed. The facility includes a pion production target station with a pion collection horn and transport into a straight section of a storage ring. {\\pi} decay within that straight section provides {\\mu}'s that are stored within the ring for subsequent decay providing precision electron and muon neutrino beams. The ring and transport designs are described and optimized. Genetic Algorithm optimization of the horn and transport into the ring has been performed, providing a significant increase in intensity

Neuffer, David; Bross, A

2015-01-01T23:59:59.000Z

465

ARM - Value-Added Products - Status  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Process Status Software Status Status Updated On Notes Released Version SGP C1 Green led Running Green led Released 2012-08-06 SGP.C1 (Lamont, OK) 1997-2009 v2.0:...

466

Expanding Your Horizons scheduled for March 2  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Expanding Your Horizons Expanding Your Horizons Community Connections: Our link to Northern New Mexico Communities Latest Issue:Dec. 2013 - Jan. 2014 All Issues » submit Expanding Your Horizons scheduled for March 2 The conference offers fifth- to 12th-grade girls opportunities to participate in hands-on workshops about science, technology, engineering, math and related fields. February 1, 2013 dummy image Read our archives. Contacts Editor Linda Anderman Email Community Programs Office Kurt Steinhaus Email Up to 250 young women are expected to participate in the workshops that will include subjects such as computers and robots, veterinary medicine, cryptography and ocean science. This year the Santa Fe and Los Alamos Expanding Your Horizons (EYH) conferences are combined into one, all-day session to be held on March 2 at

467

DOE HQ Shuttle Bus Schedule and Route | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

DOE HQ Shuttle Bus Schedule and Route DOE HQ Shuttle Bus Schedule and Route DOE HQ Shuttle Bus Schedule and Route The DOE Shuttle Buses follow the same schedules between the two main Headquarters locations, Forrestal and Germantown. The buses start their routes at each Headquarters facility at the same times, see the schedule below. The subsequent stops at the other facilities are relative to the departure time of each route. Headquarters employees are reminded of the statutory provisions that authorize and limit the use of the shuttle bus service. Specific authority for the use of appropriated funds to pay for transportation for official purposes is contained in section 1344(a)(1) of Title 31, U.S. Code. Use of this transportation for any other purpose is inappropriate and against the law.

468

AP-2-B Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2-B Wholesale Power Rate Schedule 2-B Wholesale Power Rate Schedule AP-2-B Wholesale Power Rate Schedule Area: American Electric Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia to whom power may be transmitted pursuant to contracts between the Government, American Electric Power Service Corporation (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects and sold under appropriate contracts between the Government and the Customer. Document Available for Download

469

SOCO-2-E Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2-E Wholesale Power Rate Schedule 2-E Wholesale Power Rate Schedule SOCO-2-E Wholesale Power Rate Schedule Area: PowerSouth Off-System System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, and Florida to whom power may be transmitted pursuant to contracts between the Government and Southern Company Services, Incorporated (hereinafter called the Company) and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate

470

SOCO-4-E Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4-E Wholesale Power Rate Schedule 4-E Wholesale Power Rate Schedule SOCO-4-E Wholesale Power Rate Schedule Area: OPC System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, and Florida served through the transmission facilities of Southern Company Services, Inc. (hereinafter called the Company) or the Georgia Integrated Transmission System. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects (hereinafter referred to collectively as the Projects) and sold under appropriate contracts between

471

HSO SPOTLIGHT No 01 2012 HSO Meeting Schedule for 2012  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

HSO SPOTLIGHT No. 01-2012: 2012 Schedule of Quarterly HSO Meetings HSO SPOTLIGHT No. 01-2012: 2012 Schedule of Quarterly HSO Meetings What is the issue? Meeting and Training Schedule Why do we need this? Informational Who is impacted? HSOs What does the HSO need to do? This is an informational Spotlight only NOTICE: The information in all HSO Spotlights applies only at Department of Energy (DOE) Headquarters facilities in the Washington, DC area. They are not intended to apply at DOE field sites, which may have entirely different local procedures. The HSO Program Manager has established the schedule below for quarterly HSO meetings in 2012. Please note that the topics listed are subject to change. HSO Quarterly Meeting and Training Schedule 2011 10:00 to Noon each day FORS Date / Room

472

CM-1-H Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

CM-1-H Wholesale Power Rate Schedule CM-1-H Wholesale Power Rate Schedule CM-1-H Wholesale Power Rate Schedule October 1, 2011 - 3:22pm Addthis Availability: This rate schedule shall be available to the South Mississippi Electric Power Association, Municipal Energy Agency of Mississippi, and Mississippi Delta Energy Agency (hereinafter called the Customers). Applicability: This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereinafter called collectively the "Cumberland Projects") and sold in wholesale quantities. Character of Service: The electric capacity and energy supplied hereunder will be three phase

473

Department Sets Aggressive Schedule for New Appliance Standards |  

Broader source: Energy.gov (indexed) [DOE]

Sets Aggressive Schedule for New Appliance Standards Sets Aggressive Schedule for New Appliance Standards Department Sets Aggressive Schedule for New Appliance Standards February 1, 2006 - 8:52am Addthis WASHINGTON, DC - The Department of Energy (DOE) today released a schedule for setting new appliance efficiency standards. The five-year plan outlines how DOE will work with all of its partners to address the appliance standards rulemaking backlog and meet all of the statutory requirements established in the Energy Policy and Conservation Act and the Energy Policy Act of 2005 (EPACT 2005). "Improved efficiency saves Americans money and energy," said Acting Assistant Secretary for Energy Efficiency and Renewable Energy, Douglas L. Faulkner. "This aggressive schedule shows our commitment to greater

474

Balancing Authority Cooperation Concepts - Intra-Hour Scheduling  

SciTech Connect (OSTI)

The overall objective of this study was to understand, on an Interconnection-wide basis, the effects intra-hour scheduling compared to hourly scheduling. Moreover, the study sought to understand how the benefits of intra-hour scheduling would change by altering the input assumptions in different scenarios. This report describes results of three separate scenarios with differing key assumptions and comparing the production costs between hourly scheduling and 10-minute scheduling performance. The different scenarios were chosen to provide insight into how the estimated benefits might change by altering input assumptions. Several key assumptions were different in the three scenarios, however most assumptions were similar and/or unchanged among the scenarios.

Hunsaker, Matthew; Samaan, Nader; Milligan, Michael; Guo, Tao; Liu, Guangjuan; Toolson, Jacob

2013-03-29T23:59:59.000Z

475

Department Sets Aggressive Schedule for New Appliance Standards |  

Broader source: Energy.gov (indexed) [DOE]

Department Sets Aggressive Schedule for New Appliance Standards Department Sets Aggressive Schedule for New Appliance Standards Department Sets Aggressive Schedule for New Appliance Standards February 1, 2006 - 8:52am Addthis WASHINGTON, DC - The Department of Energy (DOE) today released a schedule for setting new appliance efficiency standards. The five-year plan outlines how DOE will work with all of its partners to address the appliance standards rulemaking backlog and meet all of the statutory requirements established in the Energy Policy and Conservation Act and the Energy Policy Act of 2005 (EPACT 2005). "Improved efficiency saves Americans money and energy," said Acting Assistant Secretary for Energy Efficiency and Renewable Energy, Douglas L. Faulkner. "This aggressive schedule shows our commitment to greater

476

DEPARTMENT OF ENERGY RESEARCH AND DEVELOPMENT RECORDS SCHEDULE  

Broader source: Energy.gov (indexed) [DOE]

13 13 DEPARTMENT OF ENERGY RESEARCH AND DEVELOPMENT RECORDS SCHEDULE N1-434-96-9, N1-434-07-01, and N1-434-08-02 Revision 2 June 2008 Scope. This schedule encompasses research and development (R&D) records generated within the Department of Energy (DOE) complex, which consists of all DOE offices and its contractor organizations, such as the National Laboratories. It applies to all applicable records regardless of media or format, including paper, audio and visual, and electronic records. Excluded from this schedule are R&D records pertaining to (a) nuclear weapons, which are covered by DOE Nuclear Weapons Schedule (NI-434-96-5 and N1-434-98- 27), and (b) Work for Others, Cooperative Research and Development Agreements (CRADA), and cost sharing agreements, which are covered by DOE Schedule N1-434-

477

VA-2-B Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2-B Wholesale Power Rate Schedule 2-B Wholesale Power Rate Schedule VA-2-B Wholesale Power Rate Schedule Area: Virginia Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina to whom power may be transmitted pursuant to contracts between the Government, Virginia Electric and Power Company (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects and sold under appropriate contracts between the Government and the Customer. Document Available for Download

478

Robust scheduling of smart appliances with uncertain electricity prices in a heterogeneous population  

Science Journals Connector (OSTI)

Abstract Majority of the research conducted in the field of optimal scheduling of smart appliances does not consider the inherent uncertainties in this problem. Besides, the ones that count for the uncertainty usually assume full knowledge about the exact form of the probability distribution of the uncertain parameters. This assumption is hardly fulfilled in reality. In this paper, we seek to find solutions that are robust with respect to the probability distribution of the uncertain parameters while making no explicit assumptions about their exact forms. Accordingly, we define a chance-constrained model to find the optimal schedule and use robust optimization to characterize its solution and the associated uncertain parameters. We also consider the effect of heterogeneous populations on the optimal solution while simultaneously determining the most appropriate classification for accurate predictions. In the process, we investigate the effect of delays in information sharing on computed optimal conditions and we develop a new classification for in-house appliances. We explore features of our model using price data from the Olympic Peninsula project. We anticipate that by pursuing optimal options, a typical customer can save up to 33% in her electricity bills while sacrificing 19% of her comfort level. Moreover, in a heterogeneous population, while the results suggest no direct dependency between savings and income level, a meaningful correlation is detected between savings and employment status.

Nastaran Bassamzadeh; Roger Ghanem; Shuai Lu; Seyed Jalal Kazemitabar

2014-01-01T23:59:59.000Z

479

Rate Schedule CV-T3 (Supersedes Schedules CV- T2) UNITED STATES DEPARTMENT OF ENERGY  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

T3 T3 (Supersedes Schedules CV- T2) UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT SCHEDULE OF RATE FOR POINT-TO-POINT TRANSMISSION SERVICE Effective: October 1, 2011, through September 30, 2016. Available: Within the marketing area served by the Western Area Power Administration (Western), Sierra Nevada Customer Service Region. Applicable: To customers receiving Central Valley Project (CVP) firm and/or non-firm Point-to-Point (PTP) transmission service. Character and Conditions of Service: Transmission service for three-phase, alternating current at 60-hertz, delivered and metered at the voltages and points of delivery or receipt, adjusted for losses, and delivered to points of

480

Achieving Queue-Length Stability Through Maximal Scheduling in Wireless Networks  

E-Print Network [OSTI]

stability region; however, these scheduling strategies also require centralized control. Although [5], [6Achieving Queue-Length Stability Through Maximal Scheduling in Wireless Networks Prasanna Chaporkar through distributed scheduling in wireless networks. We consider a simple, local information based

Sarkar, Saswati

Note: This page contains sample records for the topic "ring status schedules" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Power Control and Transmission Scheduling for Network Utility Maximization in Wireless Networks  

E-Print Network [OSTI]

Power Control and Transmission Scheduling for Network Utility Maximization in Wireless Networks Min power control and transmis- sion scheduling problem in wireless networks with average power constraints. Index Terms--Network utility maximization, power control, transmission scheduling, column generation I

Sharma, Vinod

482

On Dynamic Scheduling of a Parallel Server System with Partial Pooling  

E-Print Network [OSTI]

proposed and refined by Harrison et al., we approximate the scheduling control problem for this parallel Scheduling of Parallel Servers. Keywords and phrases: Stochastic networks, dynamic control, resource pooling.3 Scheduling Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 3 Sequence

483

Maximising the net present value for resource-constrained project scheduling  

Science Journals Connector (OSTI)

The Resource-constrained Project Scheduling Problem (Rcpsp), in which a schedule must obey the resource constraints and the precedence constraints between pairs of activities, is one of the most studied scheduling problems. An important variation of ...

Andreas Schutt; Geoffrey Chu; Peter J. Stuckey; Mark G. Wallace

2012-05-01T23:59:59.000Z

484

Frostbite Theater - Liquid Nitrogen Experiments - The Flying Ring!  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Liquid Nitrogen and the Tea Kettle Mystery! Liquid Nitrogen and the Tea Kettle Mystery! Previous Video (Liquid Nitrogen and the Tea Kettle Mystery!) Frostbite Theater Main Index Next Video (Pewter Bells) Pewter Bells The Flying Ring! A copper ring leaps off an electromagnet when it's turned on. What happens when the ring's resistance is lowered using liquid nitrogen? [ Show Transcript ] Announcer: Frostbite Theater presents... Cold Cuts! No baloney! Joanna and Steve: Just science! Joanna: Hi! I'm Joanna! Steve: And I'm Steve! Joanna: And this is an AC powered electromagnet. And this is a copper ring. When I place the copper ring on the electromagnet and turn it on, the magnet's changing magnetic field will induce an electric current in the copper ring. The current in the ring will then create it's own magnetic

485

Joining mechanism with stem tension and interlocked compression ring  

DOE Patents [OSTI]

A stem (34) extends from a second part (30) through a hole (28) in a first part (22). A groove (38) around the stem provides a non-threaded contact surface (42) for a ring element (44) around the stem. The ring element exerts an inward force against the non-threaded contact surface at an angle that creates axial tension (T) in the stem, pulling the second part against the first part. The ring element is formed of a material that shrinks relative to the stem by sintering. The ring element may include a split collet (44C) that fits partly into the groove, and a compression ring (44E) around the collet. The non-threaded contact surface and a mating distal surface (48) of the ring element may have conic geometries (64). After shrinkage, the ring element is locked onto the stem.

James, Allister W.; Morrison, Jay A.

2012-09-04T23:59:59.000Z

486

Machine Status | Argonne Leadership Computing Facility  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

User Support User Support Machine Status Presentations Training & Outreach User Survey Machine Status Science on Mira Cores Core Hours Catalyst 65536 114771.01226563 Large scale...

487

"Annual NEPA Planning Summary Status of Ongoing NEPA Compliance Activities - Environmental Impact Statements"  

Broader source: Energy.gov (indexed) [DOE]

Status of Ongoing NEPA Compliance Activities - Environmental Impact Statements" "Bonneville Power Administration Annual NEPA Planning Summary Status of Ongoing NEPA Compliance Activities Environmental Impact Statements" "application/vnd.ms-excel" "#","*Title, Location","Estimated Cost","Estimated Schedule (**NEPA Milestones)",,"Description" ,"I-5 Corridor Reinforcement Project Cowlitz and Clark Counties, WA and Multnomah County, OR",5000000,"Determination Date:","application/vnd.ms-excel"," Construct about 70 miles of new 500-kV line between a new proposed substation near Castle Rock, WA and an exsting BPA substation in Troutdale, OR"

488

GRR Status Update - given 2013-06-26.pptx  

Open Energy Info (EERE)

Doug Hollett Doug Hollett Geothermal Technologies Program Manager Kate Young NREL Principal Investigator June 26, 2013 2 | US DOE Geothermal Program eere.energy.gov Status U pdate * Roadmap C ontent * Analyses * Web I nterface * White P apers Moving F orward Meeting Agenda 3 | US DOE Geothermal Program eere.energy.gov Colorado * Colorado agency/industry review: March 6, 2013 * Completed à through agency and legal review * Now available online Texas * Texas agency/industry review: June 12, 2013 * Comments being incorporated and re-reviewed by agencies * Flowcharts available online * Full content with legal review: scheduled for July 15 GRR Content Technology W hite P apers Web I nterface Roadmap Future P lans PermiBng A nalysis 4 | US DOE Geothermal Program eere.energy.gov

489

Status of the Boeing Dish Engine Critical Component project  

SciTech Connect (OSTI)

The Boeing Company's Dish Engine Critical Component (DECC) project started in April of 1998. It is a continuation of a solar energy program started by McDonnel Douglas (now Boeing) and United Stirling of Sweden in the mid 1980s. The overall objectives, schedule, and status of this project are presented in this paper. The hardware test configuration, hardware background, operation, and test plans are also discussed. A summary is given of the test data, which includes the daily power performance, generated energy, working-gas usage, mirror reflectivity, solar insolation, on-sun track time. Generating time, and system availability. The system performance based upon the present test data is compared to test data from the 1984/88 McDonnel Douglas/United Stirling AB/Southern California Edison test program. The test data shows that the present power, energy, and mirror performance is comparable to when the hardware was first manufactured 14 years ago.

Stone, K.W.; Nelving, H.; Braun, H.W.; Clark, T.B.; Diver, R.B.

1999-07-01T23:59:59.000Z

490

ANAIS: Status and prospects  

E-Print Network [OSTI]

ANAIS experiment will look for dark matter annual modulation with large mass of ultra-pure NaI(Tl) scintillators at the Canfranc Underground Laboratory (LSC), aiming to confirm the DAMA/LIBRA positive signal in a model-independent way. Two 12.5 kg each NaI(Tl) crystals provided by Alpha Spectra are currently taking data at the LSC. Present status of ANAIS detectors background and general performance is summarized; in particular, thanks to the high light collection efficiency prospects of lowering the threshold down to 1 keVee are reachable. Crystal radiopurity goals are fulfilled for $^{232}$Th and $^{238}$U chains and $^{40}$K activity, although higher than original goal, could be accepted; however, high $^{210}$Pb contamination out-of-equilibrium has been identified. More radiopure detectors are being built by Alpha Spectra. The ongoing high quantum efficiency PMT tests and muon veto characterization are also presented. Finally, the sensitivity of the experiment for the annual modulation in the WIMP signal,...

Amar, Julio; Cuesta, Clara; Garca, Eduardo; Ginestra, Carlos; Martnez, Mara; Olivn, Miguel A; Ortigoza, Ysrael; de Solrzano, Alfonso Ortz; Pobes, Carlos; Puimedn, Jorge; Sarsa, Mara Luisa; Villar, Jos ngel; Villar, Patricia

2015-01-01T23:59:59.000Z

491

E-Print Network 3.0 - action scheduling tool Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Lab Collection: Computer Technologies and Information Sciences 62 DesigntoCriteria Scheduling: RealTime Agent Control ? Summary: or the Design-to-Criteria scheduler. The...

492

E-Print Network 3.0 - altered fractionation schedules Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Sciences 18 Scheduling Space-Ground Communications for the Air Force Satellite Control Network Summary: Scheduling Space-Ground Communications for the Air Force...

493

E-Print Network 3.0 - appointments and schedules Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

students are required to schedule routine appoint-ments with their respective academic advisor. Summary: All EOFPEPCARR students are required to schedule routine appoint- ments...

494

E-Print Network 3.0 - aware packet scheduling Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

packets. Through simulation we show the improved performance of our scheduling algorithm... Flow N Scheduler Queues CPU Handler Packets Leaving Active Node Packets Entering...

495

PARS II End-of-Month Checklist and Processing Schedule | Department...  

Energy Savers [EERE]

and Processing Schedule PARS II End-of-Month Checklist and Processing Schedule Slide 1 More Documents & Publications Slide 1 PMCDPNewsletterOctober2010SHR.pdf October...

496

Status of Oregon's Bull Trout.  

SciTech Connect (OSTI)

Limited historical references indicate that bull trout Salvelinus confluentus in Oregon were once widely spread throughout at least 12 basins in the Klamath River and Columbia River systems. No bull trout have been observed in Oregon's coastal systems. A total of 69 bull trout populations in 12 basins are currently identified in Oregon. A comparison of the 1991 bull trout status (Ratliff and Howell 1992) to the revised 1996 status found that 7 populations were newly discovered and 1 population showed a positive or upgraded status while 22 populations showed a negative or downgraded status. The general downgrading of 32% of Oregon's bull trout populations appears largely due to increased survey efforts and increased survey accuracy rather than reduced numbers or distribution. However, three populations in the upper Klamath Basin, two in the Walla Walla Basin, and one in the Willamette Basin showed decreases in estimated population abundance or distribution.

Buchanan, David V.; Hanson, Mary L.; Hooton, Robert M.

1997-10-01T23:59:59.000Z

497

Self-seeding ring optical parametric oscillator  

DOE Patents [OSTI]

An optical parametric oscillator apparatus utilizing self-seeding with an external nanosecond-duration pump source to generate a seed pulse resulting in increased conversion efficiency. An optical parametric oscillator with a ring configuration are combined with a pump that injection seeds the optical parametric oscillator with a nanosecond duration, mJ pulse in the reverse direction as the main pulse. A retroreflecting means outside the cavity injects the seed pulse back into the cavity in the direction of the main pulse to seed the main pulse, resulting in higher conversion efficiency.

Smith, Arlee V. (Albuquerque, NM); Armstrong, Darrell J. (Albuquerque, NM)

2005-12-27T23:59:59.000Z

498

Water mass distribution in cyclonic rings  

E-Print Network [OSTI]

WATER SASS DISTR'-NUT(ON Til Cy'UON I i RL i( S A Thesis NONA M, RTE JANOPAUL Submitted to the Gvsdust CoiieSe of Texas A&N Univetslty Pst'tiel fuifl11meot of the te(N|ltem 1'lt ot the de[ ee of RASTER OP SC1ENCE i)eceml:er 1979 Nv jot Sue... lect: Phy, . ical Ocean Staphy NATRR MASS DTSPRTblJTTON 1N C". CJ. ONTO RTNGS NONA MARIE . TANOPAUL Approved as to style. and content by: (Chairman. of Committee) (Member) I( December 1979 ABS'IRACT Water Mass Distribution in Cyclonic Rings...

Janopaul, Mona Marie

2012-06-07T23:59:59.000Z

499

ARRT Courses & Schedule | Y-12 National Security Complex  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ARRT Courses & Schedule ARRT Courses & Schedule ARRT Courses & Schedule Advanced Radiological Response Techniques (ARRT) Courses The ARRT series, developed by the Defense Nuclear Weapons School, was designed specifically for the National Guard Bureau's Weapons of Mass Destruction's Civil Support Teams. The course, however, is open to other agencies that may have radiological response missions. Scenario-driven exercises cover everything from radiation fundamentals and material detection to handling and safely containing nuclear materials. The ARRT series can be used as either initial training or a refresher for attendees. Topics include the following: Consequence Management Contaminated Casualty Extraction Contamination Control Decontamination Hotline Operations Material Packaging

500

Approximating Artinian Rings by Gorenstein Rings and 3-Standardness of the Maximal Ideal  

E-Print Network [OSTI]

associated to an Artin local ring, called its Gorenstein colength . We study the basic properties and give bounds on this number in this chapter. We extend results due to W. Teter, C.Huneke and A. Vraciu by studying the relation of Gorenstein colength...

Hariharan, Ananthnarayan

2009-07-23T23:59:59.000Z