National Library of Energy BETA

Sample records for ring status schedules

  1. Document Status & Schedules | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Document Status & Schedules Document Status & Schedules Schedules of Key Environmental Impact Statements This document graphically displays the milestone dates and projected ...

  2. Machine Status and Schedule | Advanced Photon Source

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    @apsnotify on Twitter | RSS feed Email lists: APS Notify | XRAYOPS APSStatus App: Android Beamline Status Beamline Status Beam Properties Beam Properties Storage Ring...

  3. APS Storage Ring Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ring Under Maintenance Operations Messages: Operators in Charge : Dmitriy Ronzhin Floor Coordinator : Wendy VanWingeren (2-0101) Fill Pattern : Problem Information : Last DumpTrip...

  4. Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Please contact the beamline staff to schedule data collection. CAMD's operation schedule

  5. Status of the ATF Damping Ring BPM Upgrade Project

    SciTech Connect (OSTI)

    Briegel, C.; Eddy, N.; Haynes, B.; May, J.; McCormick, D.; Nelson, J.; Nicklaus, D.; Prieto, P.; Rechenmacher, R.; Smith, T.; Teranuma, N.; Urakawa, J.; Voy, D.; Wendt, M.; Woodley, M.; /SLAC

    2011-12-01

    A substantial upgrade of the beam position monitors (BPM) at the ATF (Accelerator Test Facility) damping ring is currently in progress. Implementing digital read-out signal processing techniques in line with an optimized, low-noise analog downconverter, a resolution well below 1 mum could be demonstrated at 20 (of 96) upgraded BPM stations. The narrowband, high resolution BPM mode permits investigation of all types of non-linearities, imperfections and other obstacles in the machine which may limit the very low target aimed vertical beam emittance of < 2 pm. The technical status of the project, first beam measurements and an outlook to it's finalization are presented.

  6. Schedules

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Schedules Schedules Print Current Long-Term Operating Schedule February 2016-June 2016 Upcoming Long-Term Operating Schedule July 2016-December 2016 Past Long-Term Operating Schedules July 2015-January 2016 (.xls) January-June 2015 (.xls) July-December 2014 (.xls) January-June 2014 (.xls) August-December 2013 (.xls) January-July 2013 July-December 2012 January-June 2012 July-December 2011 January-June 2011 July-December 2010 January-June 2010 July-December 2009 January-June 2009 July-December

  7. Schedules

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Schedules Print Current Long-Term Operating Schedule February 2016-June 2016 Upcoming Long-Term Operating Schedule July 2016-December 2016 Past Long-Term Operating Schedules July 2015-January 2016 (.xls) January-June 2015 (.xls) July-December 2014 (.xls) January-June 2014 (.xls) August-December 2013 (.xls) January-July 2013 July-December 2012 January-June 2012 July-December 2011 January-June 2011 July-December 2010 January-June 2010 July-December 2009 January-June 2009 July-December 2008

  8. The PEP-II Project: Low-Energy Ring Design and Project Status

    SciTech Connect (OSTI)

    Zisman, Michael S.

    2006-01-02

    We describe the present status of the PEP-II project. The project comprises four major systems: Injector, High-Energy Ring (HER), Low-Energy Ring (LER), and Interaction Region (IR). We focus in detail on the design of the LER, as its parameters and requirements are most closely related to those required for the Beijing Tau-Charm Factory rings. The PEP-II LER is a high-current, 3.1-GeV positron ring mounted above the 9-GeV HER. The LER uses a wiggler located in one of its six straight sections to provide emittance control and additional damping. We describe the rather complicated IR, which must transport the LER beam into the plane of the HER, focus it to a common beam size, and separate the beams after the head-on collisions. Both permanent magnet and conventional electromagnets are used in this area. The LER lattice has now adopted a simplified non-interleaved sextupole correction scheme that has reduced the required number of sextupoles substantially. We describe the LER vacuum system, one of the most challenging subsystems in PEP-II. It employs several technologies. In the arcs, aluminum extrusions and titanium sublimation pumps are employed; the straight sections use stainless steel chambers with lumped ion pumps. In the wiggler area, an extended copper photon dump with nonevaporable getter (NEG) pumps is employed to handle the very large synchrotron radiation power. The design of the room-temperature RF system, the bunch-by-bunch longitudinal and transverse feedback systems, and some of the special diagnostics will be described briefly. The PEP-II project remains on schedule to begin commissioning of the HER in April 1997, followed by the LER a year later.

  9. Status and Early Commissioning Results for the PEP-II High Energy Ring

    Office of Scientific and Technical Information (OSTI)

    (Technical Report) | SciTech Connect and Early Commissioning Results for the PEP-II High Energy Ring Citation Details In-Document Search Title: Status and Early Commissioning Results for the PEP-II High Energy Ring The High Energy Ring of the PEP-II B-Factory has been constructed in the PEP tunnel. It is now beginning beam commissioning. This report will address the status of the ring systems and our experience in commissioning the systems as well as the first beam running. Authors:

  10. Status of the MEIC ion collider ring design (Conference) | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    Status of the MEIC ion collider ring design Citation Details In-Document Search Title: Status of the MEIC ion collider ring design We present an update on the design of the ion collider ring of the Medium-energy Electron-Ion Collider (MEIC) proposed by Jefferson Lab. The design is based on the use of super-ferric magnets. It provides the necessary momentum range of 8 to 100 GeV/c for protons and ions, matches the electron collider ring design using PEP-II components, fits readily on the JLab

  11. Status of the PEP-II B-Factory High Energy Ring (Technical Report) |

    Office of Scientific and Technical Information (OSTI)

    SciTech Connect of the PEP-II B-Factory High Energy Ring Citation Details In-Document Search Title: Status of the PEP-II B-Factory High Energy Ring The 9 GeV High Energy Ring (HER) of the PEP-II B Factory is an electron storage ring under construction at SLAC. Significant progress has been made in the last year on all systems. As of mid 1996, all 192 dipoles have been installed, with installation of the quadrupoles underway. The vacuum system, for design currents up to 3 A average, is in

  12. Status and Early Commissioning Results for the PEP-II High Energy Ring

    Office of Scientific and Technical Information (OSTI)

    (Technical Report) | SciTech Connect and Early Commissioning Results for the PEP-II High Energy Ring Citation Details In-Document Search Title: Status and Early Commissioning Results for the PEP-II High Energy Ring × You are accessing a document from the Department of Energy's (DOE) SciTech Connect. This site is a product of DOE's Office of Scientific and Technical Information (OSTI) and is provided as a public service. Visit OSTI to utilize additional information resources in energy

  13. Status of the PEP-II B-Factory High Energy Ring (Technical Report) |

    Office of Scientific and Technical Information (OSTI)

    SciTech Connect of the PEP-II B-Factory High Energy Ring Citation Details In-Document Search Title: Status of the PEP-II B-Factory High Energy Ring × You are accessing a document from the Department of Energy's (DOE) SciTech Connect. This site is a product of DOE's Office of Scientific and Technical Information (OSTI) and is provided as a public service. Visit OSTI to utilize additional information resources in energy science and technology. A paper copy of this document is also available

  14. Live Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    For Users Live Status Queue Look Classic Queue Look Scheduled Outages Outage Log Science Gateway Status Login Node Status Filesystem Status My NERSC Move to CRT Getting Started...

  15. Schedule - 88-Inch Cyclotron

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Schedule Cyclotron Schedule

  16. Status Report on the Development of Micro-Scheduling Software for the Advanced Outage Control Center Project

    SciTech Connect (OSTI)

    Shawn St. Germain; Kenneth Thomas; Ronald Farris; Jeffrey Joe

    2014-09-01

    The long-term viability of existing nuclear power plants (NPPs) in the United States (U.S.) is dependent upon a number of factors, including maintaining high capacity factors, maintaining nuclear safety, and reducing operating costs, particularly those associated with refueling outages. Refueling outages typically take 20-30 days, and for existing light water NPPs in the U.S., the reactor cannot be in operation during the outage. Furthermore, given that many NPPs generate between $1-1.5 million/day in revenue when in operation, there is considerable interest in shortening the length of refueling outages. Yet, refueling outages are highly complex operations, involving multiple concurrent and dependent activities that are difficult to coordinate. Finding ways to improve refueling outage performance while maintaining nuclear safety has proven to be difficult. The Advanced Outage Control Center project is a research and development (R&D) demonstration activity under the Light Water Reactor Sustainability (LWRS) Program. LWRS is a R&D program which works with industry R&D programs to establish technical foundations for the licensing and managing of long-term, safe, and economical operation of current NPPs. The Advanced Outage Control Center project has the goal of improving the management of commercial NPP refueling outages. To accomplish this goal, this INL R&D project is developing an advanced outage control center (OCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. This report describes specific recent efforts to develop a capability called outage Micro-Scheduling. Micro-Scheduling is the ability to allocate and schedule outage support task resources on a sub-hour basis. Micro-Scheduling is the real-time fine-tuning of the outage schedule to react to the actual progress of the primary outage activities to ensure that support task resources are optimally deployed with the least amount of delay and unproductive use of resources. The remaining sections of this report describe in more detail the scheduling challenges that occur during outages, how a Micro-Scheduling capability helps address those challenges, and provides a status update on work accomplished to date and the path forward.

  17. Aging Study Of EPDM O-Ring Material For The H1616 Shipping Package - Three Year Status

    SciTech Connect (OSTI)

    Stefek, T.; Daugherty, W.; Skidmore, E.

    2015-11-05

    This is a 3-year status report for tasks carried out per Task Technical Plan SRNL-STI-2011-00506. A series of tasks/experiments were performed at the Savannah River National Laboratory (SRNL) to monitor the aging performance of ethylene propylene diene monomer (EPDM) O-rings used in the H1616 shipping package. The test data provide a technical basis to extend the annual maintenance of the H1616 shipping package to three years and to predict the life of the EPDM O-rings at the bounding service conditions.

  18. FIFTH INTERIM STATUS REPORT: MODEL 9975 PCV O-RING FIXTURE LONG-TERM LEAK PERFORMANCE

    SciTech Connect (OSTI)

    Daugherty, W.; Hoffman, E.

    2010-11-01

    A series of experiments to monitor the aging performance of Viton{sup reg.} GLT O-rings used in the Model 9975 package has been ongoing for six years at the Savannah River National Laboratory. Sixty-seven mock-ups of 9975 Primary Containment Vessels (PCVs) were assembled and heated to temperatures ranging from 200 to 450 F. They were leak-tested initially and have been tested at nominal six month intervals to determine if they meet the criterion of leaktightness defined in ANSI standard N14.5-97. Fourteen additional tests were initiated in 2008 with GLT-S O-rings heated to temperatures ranging from 200 to 400 F. High temperature aging continues for 36 GLT O-ring fixtures at 200--350 F. Room temperature leak test failures have been experienced in 5 of the GLT O-ring fixtures aging at 300 and 350 F, and in all 3 of the GLT O-ring fixtures aging at higher temperatures. No failures have yet been observed in GLT O-ring fixtures aging at 200 F for 30--48 months, which is still bounding to O-ring temperatures during storage in KAMS. High temperature aging continues for 6 GLT-S O-ring fixtures at 200--300 F. Room temperature leak test failures have been experienced in all 8 of the GLT-S O-ring fixtures aging at 350 and 400 F. No failures have yet been observed in GLT-S O-ring fixtures aging at 200 or 300 F for 19 months. For O-ring fixtures that have failed the room temperature leak test and been disassembled, the O-rings displayed a compression set ranging from 51--95%. This is significantly greater than seen to date for packages inspected during KAMS field surveillance (23% average). For GLT O-rings, service life based on the room temperature leak rate criterion is comparable to that predicted by compression stress relaxation (CSR) data at higher temperatures (350--400 F). While there are no comparable failure data yet at aging temperatures below 300 F, extrapolations of the data for GLT O-rings suggests that CSR model predictions provide a conservative prediction of service life relative to the leak rate criterion. Failure data at lower temperatures is needed to verify this apparent trend. Insufficient failure data exist currently to perform a similar comparison for GLT-S O-rings. Aging and periodic leak testing will continue for the remaining fixtures.

  19. FIFTH INTERIM STATUS REPORT: MODEL 9975 PCV O-RING FIXTURE LONG-TERM LEAK PERFORMANCE

    SciTech Connect (OSTI)

    Daugherty, W.; Hoffman, E.

    2011-04-11

    A series of experiments to monitor the aging performance of Viton{reg_sign} GLT O-rings used in the Model 9975 package has been ongoing for six years at the Savannah River National Laboratory. Sixty-seven mock-ups of 9975 Primary Containment Vessels (PCVs) were assembled and heated to temperatures ranging from 200 to 450 F. They were leak-tested initially and have been tested at nominal six month intervals to determine if they meet the criterion of leaktightness defined in ANSI standard N14.5-97. Fourteen additional tests were initiated in 2008 with GLT-S O-rings heated to temperatures ranging from 200 to 400 F. High temperature aging continues for 36 GLT O-ring fixtures at 200-350 F. Room temperature leak test failures have been experienced in 6 of the GLT O-ring fixtures aging at 300 and 350 F, and in all 3 of the GLT O-ring fixtures aging at higher temperatures. No failures have yet been observed in GLT O-ring fixtures aging at 200 F for 30-48 months, which is still bounding to O-ring temperatures during storage in KAMS. High temperature aging continues for 6 GLT-S O-ring fixtures at 200-300 F. Room temperature leak test failures have been experienced in all 8 of the GLT-S O-ring fixtures aging at 350 and 400 F. No failures have yet been observed in GLT-S O-ring fixtures aging at 200 or 300 F for 19 months. For O-ring fixtures that have failed the room temperature leak test and been disassembled, the Orings displayed a compression set ranging from 51-95%. This is significantly greater than seen to date for packages inspected during KAMS field surveillance (23% average). For GLT O-rings, service life based on the room temperature leak rate criterion is comparable to that predicted by compression stress relaxation (CSR) data at higher temperatures (350-400 F). While there are no comparable failure data yet at aging temperatures below 300 F, extrapolations of the data for GLT O-rings suggests the CSR model predictions provide a conservative prediction of service life relative to the leak rate criterion. Failure data at lower temperatures are needed to verify this apparent trend. Insufficient failure data exist currently to perform a similar comparison for GLT-S O-rings. Aging and periodic leak testing will continue for the remaining fixtures.

  20. Status of the MEIC ion collider ring design (Conference) | SciTech...

    Office of Scientific and Technical Information (OSTI)

    ring design You are accessing a document from the Department of Energy's (DOE) SciTech Connect. This site is a product of DOE's Office of Scientific and Technical Information ...

  1. SEVENTH INTERIM STATUS REPORT: MODEL 9975 PCV O-RING FIXTURE LONG-TERM LEAK PERFORMANCE

    SciTech Connect (OSTI)

    Daugherty, W.

    2012-08-30

    A series of experiments to monitor the aging performance of Viton GLT O-rings used in the Model 9975 package has been ongoing since 2004 at the Savannah River National Laboratory. Seventy tests using mock-ups of 9975 Primary Containment Vessels (PCVs) were assembled and heated to temperatures ranging from 200 to 450 F. They were leak-tested initially and have been tested periodically to determine if they meet the criterion of leak-tightness defined in ANSI standard N14.5-97. Fourteen additional tests were initiated in 2008 with GLT-S O-rings heated to temperatures ranging from 200 to 400 F. High temperature aging continues for 23 GLT O-ring fixtures at 200 270 F. Room temperature leak test failures have been experienced in all of the GLT O-ring fixtures aging at 350 F and higher temperatures, and in 8 fixtures aging at 300 F. The remaining GLT O-ring fixtures aging at 300 F have been retired from testing following more than 5 years at temperature without failure. No failures have yet been observed in GLT O-ring fixtures aging at 200 F for 54-72 months, which is still bounding to O-ring temperatures during storage in K-Area Complex (KAC). Based on expectations that the fixtures aging at 200 F will remain leak-tight for a significant period yet to come, 2 additional fixtures began aging in 2011 at an intermediate temperature of 270 F, with hopes that they may reach a failure condition before the 200 F fixtures. High temperature aging continues for 6 GLT-S O-ring fixtures at 200 300 F. Room temperature leak test failures have been experienced in all 8 of the GLT-S O-ring fixtures aging at 350 and 400 F. No failures have yet been observed in GLT-S O-ring fixtures aging at 200 - 300 F for 30 - 36 months. For O-ring fixtures that have failed the room temperature leak test and been disassembled, the O-rings displayed a compression set ranging from 51 96%. This is greater than seen to date for any packages inspected during KAC field surveillance (24% average). For GLT O-rings, separate service life estimates have been made based on the O-ring fixture leak test data and based on compression stress relaxation (CSR) data. These two predictive models show reasonable agreement at higher temperatures (350 400 F). However, at 300 F, the room temperature leak test failures to date experienced longer aging times than predicted by the CSRbased model. This suggests that extrapolations of the CSR model predictions to temperatures below 300 F will provide a conservative prediction of service life relative to the leak rate criterion. Leak test failure data at lower temperatures are needed to verify this apparent trend. Insufficient failure data exist currently to perform a similar comparison for GLT-S O-rings. Aging and periodic leak testing will continue for the remaining PCV O-ring fixtures.

  2. NINTH INTERIM STATUS REPORT: MODEL 9975 PCV O-RING FIXTURE LONG-TERM LEAK PERFORMANCE

    SciTech Connect (OSTI)

    Daugherty, W.

    2014-08-06

    A series of experiments to monitor the aging performance of Viton GLT O-rings used in the Model 9975 package has been ongoing since 2004 at the Savannah River National Laboratory. One approach has been to periodically evaluate the leak performance of O-rings being aged in mock-up 9975 Primary Containment Vessels (PCVs) at elevated temperatures. Other methods such as compression-stress relaxation (CSR) tests and field surveillance are also on-going to evaluate O-ring behavior. Seventy tests using PCV mock-ups were assembled and heated to temperatures ranging from 200 to 450 F. They were leak-tested initially and have been tested periodically to determine if they continue to meet the leak-tightness criterion defined in ANSI standard N14.5-97. Due to material substitution, fourteen additional tests were initiated in 2008 with GLT-S O-rings heated to temperatures ranging from 200 to 400 F. High temperature aging continues for 23 GLT O-ring fixtures at 200 270 F. Room temperature leak test failures have been experienced in all of the GLT O-ring fixtures aging at 350 F and higher temperatures, and in 8 fixtures aging at 300 F. The earliest 300 F GLT O-ring fixture failure was observed at 34 months. The remaining GLT O-ring fixtures aging at 300 F have been retired from testing following more than 5 years at temperature without failure. No failures have yet been observed in GLT O-ring fixtures aging at 200 F for 72 - 96 months, which bounds O-ring temperatures anticipated during storage in K-Area Complex (KAC). Based on expectations that the 200 F fixtures will remain leak-tight for a significant period yet to come, 2 additional fixtures began aging in 2011 at 270 F, with hopes that they may reach a failure condition before the 200 F fixtures, thus providing additional time to failure data. High temperature aging continues for 6 GLT-S O-ring fixtures at 200 300 F. Room temperature leak test failures have been experienced in all 8 of the GLT-S O-ring fixtures aging at 350 and 400 F. No failures have yet been observed in GLT-S O-ring fixtures aging at 200 - 300 F for 54 - 57 months. No additional O-ring failures have been observed since the last interim report was issued. Aging and periodic leak testing will continue for the remaining PCV fixtures. Additional irradiation of several fixtures is recommended to maintain a balance between thermal and radiation exposures similar to that experienced in storage, and to show the degree of consistency of radiation response between GLT and GLT-S O-rings.

  3. EIGHTH INTERIM STATUS REPORT: MODEL 9975 PCV O-RING FIXTURE LONG-TERM LEAK PERFORMANCE

    SciTech Connect (OSTI)

    Daugherty, W. L.

    2013-09-03

    A series of experiments to monitor the aging performance of Viton GLT O-rings used in the Model 9975 package has been ongoing since 2004 at the Savannah River National Laboratory. Seventy tests using mock-ups of 9975 Primary Containment Vessels (PCVs) were assembled and heated to temperatures ranging from 200 to 450 F. They were leak-tested initially and have been tested periodically to determine if they meet the criterion of leak-tightness defined in ANSI standard N14.5-97. Fourteen additional tests were initiated in 2008 with GLT-S O-rings heated to temperatures ranging from 200 to 400 F. High temperature aging continues for 23 GLT O-ring fixtures at 200 270 F. Room temperature leak test failures have been experienced in all of the GLT O-ring fixtures aging at 350 F and higher temperatures, and in 8 fixtures aging at 300 F. The remaining GLT O-ring fixtures aging at 300 F have been retired from testing following more than 5 years at temperature without failure. No failures have yet been observed in GLT O-ring fixtures aging at 200 F for 61 - 85 months, which is still bounding to O-ring temperatures during storage in KArea Complex (KAC). Based on expectations that the fixtures aging at 200 F will remain leaktight for a significant period yet to come, 2 additional fixtures began aging in 2011 at an intermediate temperature of 270 F, with hopes that they may reach a failure condition before the 200 F fixtures. High temperature aging continues for 6 GLT-S O-ring fixtures at 200 300 F. Room temperature leak test failures have been experienced in all 8 of the GLT-S O-ring fixtures aging at 350 and 400 F. No failures have yet been observed in GLT-S O-ring fixtures aging at 200 - 300 F for 41 - 45 months. Aging and periodic leak testing will continue for the remaining PCV fixtures.

  4. SIXTH INTERIM STATUS REPORT: MODEL 9975 PCV O-RING FIXTURE LONG-TERM LEAK PERFORMANCE

    SciTech Connect (OSTI)

    Daugherty, W.

    2011-08-31

    A series of experiments to monitor the aging performance of Viton{reg_sign} GLT O-rings used in the Model 9975 package has been ongoing for seven years at the Savannah River National Laboratory. Seventy tests using mock-ups of 9975 Primary Containment Vessels (PCVs) were assembled and heated to temperatures ranging from 200 to 450 F. They were leak-tested initially and have been tested periodically to determine if they meet the criterion of leak-tightness defined in ANSI standard N14.5-97. Fourteen additional tests were initiated in 2008 with GLT-S O-rings heated to temperatures ranging from 200 to 400 F. High temperature aging continues for 33 GLT O-ring fixtures at 200-300 F. Room temperature leak test failures have been experienced in all of the GLT O-ring fixtures aging at 350 F and higher temperatures, and in 7 fixtures aging at 300 F. No failures have yet been observed in GLT O-ring fixtures aging at 200 F for 41-60 months, which is still bounding to O-ring temperatures during storage in K-Area Complex (KAC). Based on expectations that the fixtures aging at 200 F will remain leak-tight for a significant period yet to come, 2 additional fixtures began aging within the past year at an intermediate temperature of 270 F, with hopes that they may leak before the 200 F fixtures. High temperature aging continues for 6 GLT-S O-ring fixtures at 200-300 F. Room temperature leak test failures have been experienced in all 8 of the GLT-S O-ring fixtures aging at 350 and 400 F. No failures have yet been observed in GLT-S O-ring fixtures aging at 200-300 F for up to 26 months. For O-ring fixtures that have failed the room temperature leak test and been disassembled, the Orings displayed a compression set ranging from 51-96%. This is greater than seen to date for packages inspected during KAC field surveillance (24% average). For GLT O-rings, separate service life estimates have been made based on the O-ring fixture leak test data and based on compression stress relaxation (CSR) data. These two predictive models show reasonable agreement at higher temperatures (350-400 F). However, at 300 F, the room temperature leak test failures to date experienced longer aging times than predicted by the CSR-based model. This suggests that extrapolations of the CSR model predictions to temperatures below 300 F will provide a conservative prediction of service life relative to the leak rate criterion. Leak test failure data at lower temperatures are needed to verify this apparent trend. Insufficient failure data exist currently to perform a similar comparison for GLT-S O-rings. Aging and periodic leak testing will continue for the remaining fixtures.

  5. STATUS REPORT FOR AGING STUDIES OF EPDM O-RING MATERIAL FOR THE H1616 SHIPPING PACKAGE

    SciTech Connect (OSTI)

    Stefek, T.; Daugherty, W.; Skidmore, E.

    2012-08-31

    This is an interim status report for tasks carried out per Task Technical Plan SRNL-STI-2011-00506. A series of tasks/experiments are being performed at the Savannah River National Laboratory to monitor the aging performance of ethylene propylene diene monomer (EPDM) Orings used in the H1616 shipping package. The data will support the technical basis to extend the annual maintenance of the EPDM O-rings in the H1616 shipping package and to predict the life of the seals at bounding service conditions. Current expectations are that the O-rings will maintain a seal at bounding normal temperatures in service (152 F) for at least 12 months. The baseline aging data review suggests that the EPDM O-rings are likely to retain significant mechanical properties and sealing force at bounding service temperatures to provide a service life of at least 2 years. At lower, more realistic temperatures, longer service life is likely. Parallel compression stress relaxation and vessel leak test efforts are in progress to further validate this assessment and quantify a more realistic service life prediction. The H1616 shipping package O-rings were evaluated for baseline property data as part of this test program. This was done to provide a basis for comparison of changes in material properties and performance parameters as a function of aging. This initial characterization was limited to physical and mechanical properties, namely hardness, thickness and tensile strength. These properties appear to be consistent with O-ring specifications. Three H1616-1 Containment Vessels were placed in test conditions and are aging at temperatures ranging from 160 to 300 F. The vessels were Helium leak-tested initially and have been tested at periodic intervals after cooling to room temperature to determine if they meet the criterion of leaktightness defined in ANSI standard N14.5-97 (< 1E-07 std cc air/sec at room temperature). To date, no leak test failures have occurred. The cumulative time at temperature ranges from 174 days for the 300 F vessel to 189 days for the 160 F vessel as of 8/1/2012. The compression stress-relaxation (CSR) behavior of H1616 shipping package O-rings is being evaluated to develop an aging model based on material properties. O-ring segments were initially aged at four temperatures (175 F, 235 F, 300 F and 350 F). These temperatures were selected to bound normal service temperatures and to challenge the seals within a reasonable aging period. Currently, samples aging at 300 F and 350 F have reached the mechanical failure point (end of life) which is defined in this study as 90% loss of initial sealing force. As a result, additional samples more recently began aging at {approx}270 F to provide additional data for the aging model. Aging and periodic leak testing of the full containment vessels, as well as CSR testing of O-ring segments is ongoing. Continued testing per the Task Technical Plan is recommended in order to validate the assumptions outlined in this status report and to quantify and validate the long-term performance of O-ring seals under actual service conditions.

  6. Operation Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operation Schedule Daily Hours of Operation

  7. Tenth interim status report: Model 9975 O-ring fixture long-term leak performance

    SciTech Connect (OSTI)

    Daugherty, W. L.

    2015-08-26

    A series of experiments to monitor the aging performance of Viton® GLT O-rings used in the Model 9975 package has been ongoing since 2004 at the Savannah River National Laboratory. One approach has been to periodically evaluate the leak performance of O-rings being aged in mock-up 9975 Primary Containment Vessels (PCVs) at elevated temperatures. Other methods such as compression-stress relaxation (CSR) tests and field surveillance are also on-going to evaluate O-ring behavior. Seventy tests using PCV mock-ups were assembled and heated to temperatures ranging from 200 to 450 °F. They were leak-tested initially and have been tested periodically to determine if they continue to meet the leak-tightness criterion defined in ANSI standard N14.5-97. Due to material substitution, fourteen additional tests were initiated in 2008 with GLT-S O-rings heated to temperatures ranging from 200 to 400 °F.

  8. Project organizations and schedules

    SciTech Connect (OSTI)

    Briggs, R.J.

    1990-07-01

    The Superconducting Super Collider Laboratory (SSCL) faces the challenge of simultaneously carrying out a large-scale construction project with demanding cost, schedule, and performance goals; and creating a scientific laboratory capable of exploiting this unique scientific instrument. This paper describes the status of the laboratory organization developed to achieve these goals, and the major near-term schedule objectives of the project.

  9. The Schedule

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    The schedule is one of the building blocks for project development. A schedule helps determine the duration of the project, the critical activities, and when funds are required. This chapter will briefly discuss some scheduling basics.

  10. Live Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Queue Look Classic Queue Look Scheduled Outages Outage Log Science Gateway Status Login Node Status Filesystem Status My NERSC Getting Started Accounts & Allocations Cori Phase II Schedule Computational Systems Storage & File Systems Data & Analytics Connecting to NERSC Queues and Scheduling Job Logs & Statistics Application Performance Training & Tutorials Software Policies User Surveys NERSC Users Group User Announcements Help Staff Blogs Request Repository Mailing List

  11. Rate Schedules

    Broader source: Energy.gov [DOE]

    One of the major responsibilities of Southeastern is to design, formulate, and justify rate schedules. Repayment studies prepared by the agency determine revenue requirements and appropriate rate...

  12. Weekly Petroleum Status Report Schedule

    Gasoline and Diesel Fuel Update (EIA)

    1 Appendix A Table A1. Petroleum Supply Summary, April 2016 (derived from weekly data) Category April 2016 March 2016 Difference April 2015 Percent Change WPSR to PSM Comparison February 2016 PSM February 2016 Difference Stocks (Million Barrels) Total Stocks (Including SPR) 1 ..................... 2,065.5 2,052.1 13.4 1,941.1 6.4 2,041.0 2,044.6 -3.6 Crude Oil ................................................... 1,237.5 1,225.0 12.5 1,178.0 5.1 1,215.3 1,214.8 0.5 SPR 2

  13. 2016 Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CAMD 2016 User Meeting Schedule Printable Schedule (pdf) Printable Poster Abstracts (pdf) Printable Talk Abstracts (pdf) Friday, April 29th, 2016 CAMD, 6980 Jefferson Highway, Baton Rouge, LA 70806 10:00 AM - 12:20 PM Morning Session Registration near CAMD Conference Room, 2nd office building 10:00 - 11:20 Experiment Hall; Visit Multipole Wiggler Beamlines as well as newly installed or rebuilt beamlines SAXS, 5-m TGM and LEXAS; CAMD Beamline Scientists will be available to discuss capabilities

  14. Current Schedule of Experiments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Current Schedule of Experiments Current Schedule of Experiments - Updated 4/2016

  15. LANSCE-NS Block Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LANSCE Planned Run Schedule - 2015/2016 run_schedule

  16. Module 3- Project Scheduling

    Broader source: Energy.gov [DOE]

    This module differentiates between planning and scheduling and outlines basic scheduling concepts, the logic relationships and critical path, and different schedule formats.

  17. UGE Scheduler Cycle Time

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    UGE Scheduler Cycle Time UGE Scheduler Cycle Time Genepool Cycle Time Genepool Daily Genepool Weekly Phoebe Cycle Time Phoebe Daily Phoebe Weekly What is the Scheduler Cycle? The...

  18. Cori Phase II Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Queues and Scheduling Job Logs & Statistics Application Performance Training & Tutorials Software Policies User Surveys NERSC Users Group User Announcements Help Staff Blogs Request Repository Mailing List Operations for: Passwords & Off-Hours Status 1-800-66-NERSC, option 1 or 510-486-6821 Account Support https://nim.nersc.gov accounts@nersc.gov 1-800-66-NERSC, option 2 or 510-486-8612 Consulting http://help.nersc.gov consult@nersc.gov 1-800-66-NERSC, option 3 or 510-486-8611 Home

  19. UGE Scheduler Cycle Time

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    UGE Scheduler Cycle Time UGE Scheduler Cycle Time Genepool Cycle Time Genepool Scheduler Cycle Time Genepool Jobs Dispatched / Hour What is the Scheduler Cycle? The Univa Grid Engine Scheduler cycle performs a number of important tasks, including: Prioritizing Jobs Reserving Resources for jobs requesting more resources (slots / memory) Dispatching jobs or tasks to the compute nodes Evaluating job dependencies The "cycle time" is the length of time it takes the scheduler to complete all

  20. LANSCE | User Resources | Schedules

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Schedules You will be notified of your experiment schedule at least 3-6 weeks prior to your start date. Two (2) weeks post-review, beam-time will be scheduled by the Instrument Scientist in consultation with the user. Three (3) weeks post review, schedule letters are sent to the Principal Investigator. After scheduling experiments, the LANSCE User Office will contact you to determine and schedule applicable training, assist with travel arrangements, initiate and required foreign national access

  1. 2012 Transmission Rate Schedules

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2014 Transmission, Ancillary, and Control Area Service Rate Schedules and General Rate Schedule Provisions (FY 2014-2015) October 2013 United States Department of Energy...

  2. Accelerator and Experiment Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nominal Dates for Scheduling Requests (updated July 10, 2014) Please see the information for the requirements before scheduling can be requested at http:www.jlab.org...

  3. ADMINISTRATIVE RECORDS SCHEDULE 23: ADMINISTRATIVE RECORDS SCHEDULE...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This schedule provides for the disposal of certain records common to most offices. It covers administrative subject files; facilitative records such as suspense files, tracking and ...

  4. Storage Ring Synchrotron Radiation Sources

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    srlogo_t.gif (19784 bytes) As of March 1, 2005 this WEB page is no longer updated. For future information about light sources go to Hyperlinks in the "RING (INST. )" column will bring up the facility's home page. Hyperlinks in the "NOTES" column will bring up the present status of the storage ring. LOCATION RING (INST.) ELECTRON ENERGY [GeV] NOTES ARMENIA Yerevan Candle 3.2 Design/Dedicated AUSTRALIA Melbourne Australian Synchrotron 3 Dedicated* BRAZIL Campinas LNLS 1.35

  5. Dedicated heterogeneous node scheduling including backfill scheduling

    DOE Patents [OSTI]

    Wood, Robert R. (Livermore, CA); Eckert, Philip D. (Livermore, CA); Hommes, Gregg (Pleasanton, CA)

    2006-07-25

    A method and system for job backfill scheduling dedicated heterogeneous nodes in a multi-node computing environment. Heterogeneous nodes are grouped into homogeneous node sub-pools. For each sub-pool, a free node schedule (FNS) is created so that the number of to chart the free nodes over time. For each prioritized job, using the FNS of sub-pools having nodes useable by a particular job, to determine the earliest time range (ETR) capable of running the job. Once determined for a particular job, scheduling the job to run in that ETR. If the ETR determined for a lower priority job (LPJ) has a start time earlier than a higher priority job (HPJ), then the LPJ is scheduled in that ETR if it would not disturb the anticipated start times of any HPJ previously scheduled for a future time. Thus, efficient utilization and throughput of such computing environments may be increased by utilizing resources otherwise remaining idle.

  6. Accelerator mass spectrometry facility at the University of Washington: current status, and an application to the /sup 14/C profile of a tree ring

    SciTech Connect (OSTI)

    Farwell, G.W.; Grootes, P.M.; Leach, D.D.; Schmidt, F.H.

    1984-01-01

    The University of Washington Model FN Tandem accelerator (1) is used for Accelerator Mass Spectrometry (AMS) of /sup 10/Be and /sup 14/C. This paper describes our basic system, our methods for rare-isotope normalization, final ion detection, and sample preparation, and the general problem of adapting an existing accelerator to meet the stringent stability requirements of precision AMS measurements while retaining human and technical compatibility with other users and uses of the accelerator. Recent preliminary data obtained on /sup 14/C in thin sequential sections of a single Sitka spruce tree ring (1963) are presented.

  7. SSRL- Experimental Run Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FY2008 Experimental Run Schedules 2008 Run Ends August 11, 2008. User Operations will resume November 2008. Operating Maintenance Beam Line Schedule FY2009 FY2008 X-ray (1-4,...

  8. ADMINISTRATIVE RECORDS SCHEDULES COMPILED

    Broader source: Energy.gov [DOE]

    The Administrative Records Schedules are intended to provide a consolidated and customized DOE listing of schedule information compiled from NARA-approved GRS and DOE-specific Records Control...

  9. PART I - THE SCHEDULE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    124 i PART I - THE SCHEDULE SECTION F - DELIVERIES OR PERFORMANCE TABLE OF CONTENTS F.1 PERIOD OF PERFORMANCE ......

  10. NERSC Holiday Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Holiday Schedule NERSC Holiday Schedule December 20, 2013 by Francesca Verdier All NERSC computing and storage systems will remain in full operation throughout the holiday season (Tuesday December 24 through Wednesday January 1). From Tuesday December 24 through Wednesday January 1, NERSC Consulting and Account Support services will be available *only* on Friday December 27 and Monday December 30, from 8:00 to 5:00 Pacific Time. Normal Consulting and Account Support schedules will resume on

  11. SRI2007 Conference - Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Photo Gallery Manuscript Submission Conference Schedule SRI2007 conference will feature oral and poster sessions on synchrotron-radiation related topics; sources, beamlines,...

  12. Disposition Schedules | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Disposition Schedules Disposition Schedules keyboard-70506__180.jpg Records Disposition Schedules The DOE Records Disposition Schedules provide the authority for transfer and disposal of records created and maintained by the Department. Disposition Schedules and the citations to the disposition authorities are available at the following links: DOE Administrative Records Schedules -- provides a list of records contained in the NARA General Records Schedule as customized to the needs of the

  13. Hopper scheduled maintenance tomorrow (Sept 19) and /project outage

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    scheduled maintenance tomorrow (Sept 19) and /project outage Hopper scheduled maintenance tomorrow (Sept 19) and /project outage September 18, 2012 by Helen He There will be a scheduled hardware and software maintenance for Hopper next Wednesday, Sept 19, from 6:30 am to midnight Pacific time. Please plan your work accordingly and check the NERSC Message of the Day (MOTD) for status update: http://www.nersc.gov/live-status/motd/. The /project file system (also known as /global/project) will be

  14. Updates and Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Status Updates and Status Current Status: Up Open Issues List of known problems, submitted bug reports and issues we are actively working on. Read More » Hopper Featured Announcements A list of key Hopper announcements and system changes. Read More » Hopper Email Announcements Archive An archive of email announcements sent to NERSC users regarding Hopper. Read More » Announcements Hopper OS upgrade and new SW set to default next Wed, Feb 27 21 February 2013, 10:29 am Hopper scheduled

  15. Wholesale Power Rate Schedules | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rate Schedules Wholesale Power Rate Schedules Wholesale Power Rate Schedules October 1, 2012 ALA-1-N Wholesale Power Rate Schedule Area: PowerSouth Energy Cooperative System:...

  16. _PART I - THE SCHEDULE

    National Nuclear Security Administration (NNSA)

    I - THE SCHEDULE TABLE OF CONTENTS SECTION B: SUPPLIES OR SERVICES AND PRICES/COSTS ......................................................................... 1 B-1 SERVICES BEING ACQUIRED ........................................................................................................ 1 CLIN 0001 MANAGEMENT AND OPERATION OF THE NATIONAL SECURITY CAMPUS ..................... 1 CLIN 0001A TRANSITION TERM

  17. PART I - THE SCHEDULE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    G Contract No. DE-AC06-09RL14728 G-i PART I - THE SCHEDULE SECTION G CONTRACT ADMINISTRATION DATA TABLE OF CONTENTS G.1 CONTRACT ADMINISTRATION ......

  18. PART I - THE SCHEDULE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    G Contract No. DE-AC27-08RV14800 Modification No. 020 G-i PART I - THE SCHEDULE SECTION G CONTRACT ADMINISTRATION DATA TABLE OF CONTENTS G.1 CONTRACT ADMINISTRATION...

  19. PART I - THE SCHEDULE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    G Contract No. DE-AC06-08RL14788 G-i PART I - THE SCHEDULE SECTION G CONTRACT ADMINISTRATION DATA TABLE OF CONTENTS G.1 CONTRACT ADMINISTRATION ......

  20. Schedule of Technical Meetings

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    River Fish Mitigation plant-in-service schedule Process used to review CRFM program Benchmarking mid-C hydro projects Timing for spill tests on Snake River Cost management efforts...

  1. NERSC Scheduled System Outages

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NERSC Scheduled System Outages NERSC Outages Your browser does not appear to support JavaScript, but this page needs to use JavaScript to display correctly. You can visit the...

  2. Energy Exchange Schedule

    Broader source: Energy.gov [DOE]

    The schedule for Energy Exchange is now available. Attendees will have the option of attending a variety of training sessions offered within 10 tracks during the times listed below. Session details...

  3. Re: 'BPA Upcoming Schedule'

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Re: 'BPA Upcoming Schedule' Larson,Cheryl A - PS-6 From: Kari, Don (Perkins Coie) DKari@perkinscoie.com Sent: Monday, July 14, 2008 9:36 AM To: Larson,Cheryl A - PS-6 Cc:...

  4. _PART I - THE SCHEDULE

    National Nuclear Security Administration (NNSA)

    572 dated 3215 Contract No. DE-AC04-94AL85000 Modification No. M202 Page 2 Part I - The Schedule Sections B through H TABLE OF CONTENTS B-1 SERVICES BEING ACQUIRED...

  5. _PART I - THE SCHEDULE

    National Nuclear Security Administration (NNSA)

    93015 to Mod 0588 Contract No. DE-AC04-94AL85000 Modification No. M202 Page 2 Part I - The Schedule Sections B through H TABLE OF CONTENTS B-1 SERVICES BEING ACQUIRED...

  6. Experiment Scheduling Committee

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Experiment Scheduling Committee Title Name Phome Email Deputy Director for Research Bob McKeown (757) 269-6481 bmck@jlab.org Physics Division AD (co-chair) Rolf Ent (757) 269-7373...

  7. Pushing schedule derivation method

    SciTech Connect (OSTI)

    Henriquez, B.

    1996-12-31

    The development of a Pushing Schedule Derivation Method has allowed the company to sustain the maximum production rate at CSH`s Coke Oven Battery, in spite of having single set oven machinery with a high failure index as well as a heat top tendency. The stated method provides for scheduled downtime of up to two hours for machinery maintenance purposes, periods of empty ovens for decarbonization and production loss recovery capability, while observing lower limits and uniformity of coking time.

  8. Asymmetric dipolar ring

    DOE Patents [OSTI]

    Prosandeev, Sergey A.; Ponomareva, Inna V.; Kornev, Igor A.; Bellaiche, Laurent M.

    2010-11-16

    A device having a dipolar ring surrounding an interior region that is disposed asymmetrically on the ring. The dipolar ring generates a toroidal moment switchable between at least two stable states by a homogeneous field applied to the dipolar ring in the plane of the ring. The ring may be made of ferroelectric or magnetic material. In the former case, the homogeneous field is an electric field and in the latter case, the homogeneous field is a magnetic field.

  9. Upcoming Long-Term Operating Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Upcoming Long-Term Operating Schedule Print This schedule is also available as an .xls spreadsheet.

  10. Upcoming Long-Term Operating Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Upcoming Long-Term Operating Schedule Print This schedule is also available as an .xls spreadsheet.

  11. Upcoming Long-Term Operating Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Upcoming Long-Term Operating Schedule Print This schedule is also available as an .xls spreadsheet.

  12. Current Long-Term Operating Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Current Long-Term Operating Schedule Print This schedule is also available as an .xls spreadsheet.

  13. Current Long-Term Operating Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Current Long-Term Operating Schedule Print This schedule is also available as an .xls spreadsheet.

  14. Current Long-Term Operating Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Current Long-Term Operating Schedule Print This schedule is also available as an .xls spreadsheet.

  15. Weekly User Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Weekly User Schedule Print Requests for special operations use of the "scrubbing" shift should be sent directly to Warren Byrne (486-7517) by 1:00 p.m. Friday. Any requests for changes in beam energy, bucket fill pattern, scrubbing shifts, or machine setup must be submitted to This e-mail address is being protected from spambots. You need JavaScript enabled to view it by 4:00 pm on Wednesday, the week before the scheduled run, for consideration during Thursday's Physics meeting. These

  16. Weekly User Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Weekly User Schedule Print Requests for special operations use of the "scrubbing" shift should be sent directly to Warren Byrne (486-7517) by 1:00 p.m. Friday. Any requests for changes in beam energy, bucket fill pattern, scrubbing shifts, or machine setup must be submitted to This e-mail address is being protected from spambots. You need JavaScript enabled to view it by 4:00 pm on Wednesday, the week before the scheduled run, for consideration during Thursday's Physics meeting. These

  17. Stirling engine piston ring

    DOE Patents [OSTI]

    Howarth, Roy B.

    1983-01-01

    A piston ring design for a Stirling engine wherein the contact pressure between the piston and the cylinder is maintained at a uniform level, independent of engine conditions through a balancing of the pressure exerted upon the ring's surface and thereby allowing the contact pressure on the ring to be predetermined through the use of a preloaded expander ring.

  18. Vertical-emitting, ring-geometry, ultra-low threshold and ultra-high-speed quantum-well lasers for optical interconnect. Status report No. 6, Jun-Sep 90

    SciTech Connect (OSTI)

    Mittelstein, M.; Bar-Chaim, N.

    1990-09-01

    Emphasis was placed on the following efforts: design and implementation of a test station for vertical emitting lasers; ridge waveguide structure and ring configiuration lasers; refinement of grating fabrication for repeatability; and single quantum well material investigation, Keywords: Ring lasers; Optical waveguides; Lasers (R.H.)

  19. LCLS Operating Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LCLS Operating Schedule August - December 2009 Ver: 2 103009 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 S Su M T W Th F S Su M T W Th F S...

  20. PART I - SCHEDULE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Universities DE-AC05-06OR23100 Modification 0515 Section H - Page 1 of 47 PART I - SCHEDULE SECTION H SPECIAL CONTRACT REQUIREMENTS H.1 CONSECUTIVE NUMBERING (MAY 1997) ......................................................................... 5 H.2 MODIFICATION AUTHORITY (MAY 1997) ....................................................................... 5 H.3 OVERSIGHT OF CONTRACTOR (REVISED MODIFICATION 0515) ............................ 5 H.4 DOE-H-1058 SMALL BUSINESS SUBCONTRACTING PLAN (JULY

  1. PART I - THE SCHEDULE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract No. DE-AC27-10RV15051 Conformed Thru Contract Modification No. A001 i PART I - THE SCHEDULE SECTION E - INSPECTION AND ACCEPTANCE TABLE OF CONTENTS E.1 FAR 52.246-5 INSPECTION OF SERVICES - COST-REIMBURSEMENT (APR 1984) ................................................................................................ 1 E.2 ACCEPTANCE .......................................................................................... 1 E.3

  2. PART I - THE SCHEDULE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract No. DE-AC27-10RV15051 Conformed thru Contract Modification No. 109 i PART I - THE SCHEDULE SECTION G CONTRACT ADMINISTRATION DATA TABLE OF CONTENTS G.1 CORRESPONDENCE PROCEDURES .................................................... 1 G.2 CONTRACT ADMINISTRATION .............................................................. 2 G.3 CONTRACTOR'S POINT OF CONTACT ................................................. 3 G.4 DOE CONTRACTING OFFICER'S REPRESENTATIVE ......................... 3 G.5

  3. PART I - THE SCHEDULE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    D Contract No. DE-AC06-09RL14728 D-i PART I - THE SCHEDULE SECTION D PACKAGING AND MARKING TABLE OF CONTENTS D.1 PACKAGING ................................................................................................................ D-1 D.2 MARKING .................................................................................................................... D-1 D.3 SECURITY REQUIREMENTS ...................................................................................... D-1 Mission

  4. PART I - THE SCHEDULE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    D Contract No. DE-AC27-08RV14800 D-i PART I - THE SCHEDULE SECTION D PACKAGING AND MARKING TABLE OF CONTENTS D.1 PACKAGING ................................................................................................................ D-1 D.2 MARKING .................................................................................................................... D-1 D.3 SECURITY REQUIREMENTS ...................................................................................... D-1 Tank

  5. PART I - THE SCHEDULE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    F Contract No. DE-AC27-08RV14800 Modification No. A015 F-i PART I - THE SCHEDULE SECTION F DELIVERIES OR PERFORMANCE TABLE OF CONTENTS F.1 PERIOD OF PERFORMANCE ........................................................................................................ 1 F.2 PRINCIPAL PLACE OF PERFORMANCE ...................................................................................... 1 F.3 FAR 52.242-15, STOP-WORK ORDER (AUG 1989) -- ALTERNATE I (APR 1984) ...................... 2 Tank

  6. _PART I - THE SCHEDULE

    National Nuclear Security Administration (NNSA)

    B - H, Page i PART I - THE SCHEDULE TABLE OF CONTENTS SECTION B: SUPPLIES OR SERVICES AND PRICES/COSTS ......................................................................... 3 B-1 SERVICES BEING ACQUIRED ........................................................................................................ 3 CLIN 0001 MANAGEMENT AND OPERATION OF THE NEVADA NATIONAL SECURITY SITE ............. 3 CLIN 0001A TRANSITION TERM

  7. _PART I - THE SCHEDULE

    National Nuclear Security Administration (NNSA)

    Part I - The Schedule Sections B through H TABLE OF CONTENTS Section B - SUPPLIES OR SERVICES AND PRICES/COSTS ............................................................. 4 B-1 ......SERVICES BEING ACQUIRED.................................................................................................. 4 B-2 ......CONTRACT TYPE AND VALUE ............................................................................................... 4 Section C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

  8. ADMINISTRATIVE RECORDS SCHEDULE 23: ADMINISTRATIVE RECORDS SCHEDULE 23:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    RECORDS COMMON TO MOST OFFICES | Department of Energy ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES ADMINISTRATIVE RECORDS SCHEDULE 23: ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES This schedule provides for the disposal of certain records common to most offices. It covers administrative subject files; facilitative records such as suspense files, tracking and control records, calendars, and indexes; and documents of transitory value PDF icon

  9. APS User Operations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Schedules APS Schedule Useful Links Beamline Design Library (former Design Exchange) Machine Status Link Bunch Clock Information APS Systems Status Storage Ring Operating Status...

  10. Professional Skills Program Course Schedule

    Broader source: Energy.gov [DOE]

    Professional Skills Program Training Schedule lists all courses that are offered to DOE program offices, field sites, and national laboratories.

  11. PART I - THE SCHEDULE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    F Contract No. DE-AC06-09RL14728 Modification 343 PART I - THE SCHEDULE SECTION F DELIVERIES OR PERFORMANCE TABLE OF CONTENTS F.1 PERIOD OF PERFORMANCE .................................................................................... F-1 F.2 PRINCIPAL PLACE OF PERFORMANCE .................................................................. F-1 F.3 FAR 52.242-15, STOP-WORK ORDER (AUG 1989) - ALTERNATE I (APR 1984) ..... F-2 F-i Mission Support Contract Section F Contract No. DE-AC06-09RL14728

  12. PART I - THE SCHEDULE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    E Contract No. DE-AC27-08RV14800 Modification No. A015 E-i PART I - THE SCHEDULE SECTION E INSPECTION AND ACCEPTANCE TABLE OF CONTENTS E.1 DOE INSPECTION AND ACCEPTANCE ........................................................................................... 1 E.2 FAR 52.246-3, INSPECTION OF SUPPLIES - COST-REIMBURSEMENT (MAY 2001) ................. 2 E.3 FAR 52.246-5, INSPECTION OF SERVICES - COST REIMBURSEMENT (APR 1984) ................. 3 Tank Operations Contract Section E Contract No.

  13. Queues and Scheduling Policies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Queues and Policies Queues and Scheduling Policies Users submit jobs to a submit queue and wait in line until nodes become available to run a job. NERSC's queue structures are intended to be fair and to allow jobs of various sizes to run efficiently. Balancing the job size and throughput requirements of a large number of users is always a challenge. We encourage users to send questions, feedback, or concerns about the queue structures, to the consultants. Queue Classes Submit Queue Execution

  14. DMSE Equipment Scheduling | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Scheduling Equipment ownercustodian reserves the right to override the schedule for maintenance andor other justified reasons. Abuse of the scheduling system or equipment may...

  15. _PART I - THE SCHEDULE

    National Nuclear Security Administration (NNSA)

    ... VIPERS allows vendors to check the payment status of any voucher submitted to the DOE. To obtain access to and use VIPERS, please visit the web page at https:vipers.oro.doe.gov. ...

  16. Patrick Ring | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Patrick Ring About Us Patrick Ring Team Leader, Benefits Continuity Team Acting Team Leader, Financial, Audits, and Contracts Services Team Patrick Ring has more than 31 years of ...

  17. Model Energy Savings Performance Contract, Schedules, and Exhibits...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Financing Agreement and Payment Schedule Schedule J: Compensation to ESCO for Annual Services Schedule K: Rebates, Incentives and Grants Schedule L: Contingency Fund Schedules M-P: ...

  18. ARM - Tree Rings

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PastTree Rings Outreach Home Room News Publications Traditional Knowledge Kiosks Barrow, Alaska Tropical Western Pacific Site Tours Contacts Students Study Hall About ARM Global Warming FAQ Just for Fun Meet our Friends Cool Sites Teachers Teachers' Toolbox Lesson Plans Tree Rings Tree rings are formed on an annual basis. They are caused by a more rapid growth in the spring followed by slower growth the rest of the year. Using a tree ring borer you can examine these rings and glean the following

  19. _PART I - THE SCHEDULE

    National Nuclear Security Administration (NNSA)

    9/30/15 to Mod 0588 Contract No. DE-AC04-94AL85000 Modification No. M202 Page 2 Part I - The Schedule Sections B through H TABLE OF CONTENTS B-1 SERVICES BEING ACQUIRED ......................................................................................... 4 B-2 CONTRACT TYPE AND VALUE (Rev. M218, M222, M236, M241, M261, M266, M288, M293, M312, M319, M344, M365, M400, M404, M443, M448, M473, M484, M0512, M0528, M0538, M0541, M0563, M0567, A0588)

  20. WNR Monthly Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Home WNR Schedule Text and Schedule Bar Color Key Previous Next May 2016 Flight Path S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 WNR 4FP15L-A/20m 4FP15L-B/90m 4FP15R 4FP30L-A/ICE House 4FP30L-B 4FP30R/ICE II 4FP60R/GEANIE 4FP90L/TPC Miscellaneous 7008Proposal: NS-2015-7008-F PI: Matthew Devlin Institution: Los Alamos National Laboratory Title: Start

  1. Beam Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Beam Status Beam Status Print Loading... You can also view the Operations Group's Beam History archives.

  2. 1993 Wholesale Power and Transmission Rate Schedules.

    SciTech Connect (OSTI)

    US Bonneville Power Administration

    1993-10-01

    Bonneville Power Administration 1993 Wholesale Power Rate Schedules and General Rate Schedule Provisions and 1993 Transmission Rate Schedules and General Transmission Rate Schedule Provisions, contained herein, were approved on an interim basis effective October 1, 1993. These rate schedules and provisions were approved by the Federal Energy Commission, United States Department of Energy, in September, 1993. These rate schedules and provisions supersede the Administration`s Wholesale Power Rate Schedules and General Rate Schedule Provisions and Transmission Rate Schedules and General Transmission Rate Schedule Provisions effective October 1, 1991.

  3. Construction Schedule | Advanced Photon Source

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Construction Schedule Current Projects 27-ID and 35-ID APS Vibration Reporting Protocol Summary of Construction Equipment Tests and Activities Jan 2014 Past Projects APCF LOM438...

  4. Extensible Argonne SP Scheduling System

    Energy Science and Technology Software Center (OSTI)

    1996-01-24

    The Argonne SP Scheduler provides deterministic queuing of jobs for exclusive access to the SP nodes for either batch or interactive use.

  5. Regulated Schedule 9

    U.S. Energy Information Administration (EIA) Indexed Site

    UTILITY","UTILITY_NAME","PLANT_ID","PLANT_NAME","SCHEDULE","LINENO","COL1AMOUNT","DESCRIPTION" 2002,298,"Alexandria City of",6558,"D G Hunter",9,1,"STEAM","Kind of Plant" 2002,298,"Alexandria City of",6558,"D G Hunter",9,2,1956,"Year Originally Constructed" 2002,298,"Alexandria City of",6558,"D G Hunter",9,3,1974,"Year Last Unit

  6. ARM Summer Training Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ARM Summer Training Schedule Time Wed 15 Thu 16 Fri 17 Sat 18 Sun 19 Mon 20 Tue 21 Wed 22 Thu 23 Fri 24 8:30- 10:00 Welcome, introduction & logistics L+Q: Herman Russchenberg SGP visit L+Q: Virendra Ghate Free day L+Q: Matthew Kumjian L+Q: Ewan O'Connor L+Q: David Mechem L+Q: Allison McComiskey Working Group final presentations 10:00- 10:30 Introductory Lectures Break Break Break Break Break Break Break 10:30- 12:00 L+Q: David Turner L+Q: Thijs Heus L+Q: Pavlos Kollias L+Q: Kerstin Ebell

  7. DOERS Records Schedule Cross Index to DOE Administrative Records

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Disposition Schedules | Department of Energy DOERS Records Schedule Cross Index to DOE Administrative Records Disposition Schedules DOERS Records Schedule Cross Index to DOE Administrative Records Disposition Schedules Crosswalk between DOERS and Admin Schedules PDF icon DOERS Records Schedule Cross Index to DOE Administrative Records Disposition Schedules More Documents & Publications DOE Records Disposition Schedule Changes ADMINISTRATIVE RECORDS SCHEDULE 17: CARTOGRAPHIC, AERIAL

  8. PDSF Login Node Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PDSF Login Node Status Getting Started Hardware Configuration Using the PDSF Batch System Performance and Optimization Software and Tools Announcements and Meetings Cluster Statistics Getting help Group Pages Using Carver for PDSF jobs PDSF Completed Jobs Genepool Testbeds Retired Systems Storage & File Systems Data & Analytics Connecting to NERSC Queues and Scheduling Job Logs & Statistics Application Performance Training & Tutorials Software Policies User Surveys NERSC Users

  9. LCLS Operating Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LCLS Operating Schedule August - December 2009 Ver: 2 10/30/09 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 S Su M T W Th F S Su M T W Th F S Su M T W Th F S Su M T W Th F S Su M 0000-0800 MD MD MD MD MD 0800-1600 ROD MD AMO ROD MD AMO 1600-2400 MD MD Commissioning MD MD Comm. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 T W Th F S Su M T W Th F S Su M T W Th F S Su M T W Th F S Su M T W 0000-0800 MD MD MD MD MD MD MD MD

  10. Argonne National Lab Cleanup schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Takes Steps to Complete Clean-Up of Argonne by 2003; Schedule for Shipping Waste to WIPP is 'Good News' for Illinois CARLSBAD, N.M., May 15, 2000 - The U.S. Department of Energy (DOE) reinforced plans to complete the clean-up of its Argonne National Laboratory-East site in Illinois by 2003 by accelerating its schedule for shipping transuranic waste to DOE's permanent disposal site in New Mexico. Previously, the shipments were not expected to begin before 2003. Under the accelerated schedule,

  11. Administrative Records Schedules | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Administrative Records Schedules Administrative Records Schedules Administrative Records Schedules NOTE: Most of the files below are in PDF, you will need Acrobat® Reader(tm) to view these files. SCHEDULE TITLE DATE LAST CHANGED AUTHORIZATION NUMBER Administrative Records Schedules Compiled - (Schedules 1 & 2) (pdf) 01/06/15 --- 1 Personnel Records - Superseded - See Compiled (pdf) 09/15/10 N1-434-98-4 2 Payroll & Pay Administration Records - Superseded - See Compiled (pdf) 09/15/10

  12. Model Energy Savings Performance Contract, Schedules, and Exhibits...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Schedule BB: ESCO's Maintenance Responsibilities Schedule CC: Institution's Maintenance Responsibilities Schedule DD: Facility Maintenance Checklist Schedules EE-II: Left blank for ...

  13. Application Schedule - Combustion Energy Frontier Research Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Application Schedule Application Schedule Applications for the Combustion Energy Research Fellows program are considered on a rolling basis. Applicant selection occurs three times...

  14. Alexandria Hilton Shuttle Schedule | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Schedule.doc More Documents & Publications 2015 APM Workshop - Sheraton Pentagon Shuttle Fact Sheet Shuttle Schedule Phoenix Area Transportation Information for Energy Exchange...

  15. ADMINISTRATIVE RECORDS SCHEDULE 9: TRAVEL AND TRANSPORTATION...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: TRAVEL AND TRANSPORTATION RECORDS (Revision 2) ADMINISTRATIVE RECORDS SCHEDULE 9: TRAVEL AND TRANSPORTATION RECORDS (Revision 2) This schedule covers records documenting the ...

  16. PMCDP Training Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Training Schedule PMCDP Training Schedule -Download FY2016 listing of all PMCDP training courses. For a calendar view of the upcoming training courses, please visit PMCDP Training ...

  17. LCLS Operations Schedule January February...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations Schedule January February March April May June July August September October November December 2009 Run 1 Oct. 1-Dec. 17 2010 Run 2 Run 3 May 6 - Sep. 13 Oct. 7 - Dec....

  18. FY 2016 PMCDP Training Schedule

    Energy Savers [EERE]

    Last Update February 29, 2016 1 | P a g e FY 2016 PMCDP Training Schedule Q1 FY 2016: Course Title Length Planned Delivery Timeframe Location Platform Equivalent Training Planning ...

  19. Intensive Observation Period Projects Scheduled

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 Intensive Observation Period Projects Scheduled Several IOP projects have been scheduled for the SGP CART site this spring. These projects either have already begun or will begin shortly. Radiosondes The RS-90 Transition IOP is currently under way. The RS-90 model radiosonde is gradually replacing the older RS-80 model. Radiosondes are instrument packages attached to and launched by weather balloons. The instruments measure atmospheric pressure, temperature, and relative humidity as the

  20. APS Storage Ring Parameters

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    next up previous Next: Main Parameters APS Storage Ring Parameters M. Borland, G. Decker, L. Emery, W. Guo, K. Harkay, V. Sajaev, C.-Y. Yao Advanced Photon Source September 8, 2010...

  1. Technical Qualification Program Accreditation Schedule | Department of

    Energy Savers [EERE]

    Energy Schedule Technical Qualification Program Accreditation Schedule Technical Qualification Program (TQP) Accreditation Schedule for CY 2013 and 2014. PDF icon TQP Accreditation Schedule More Documents & Publications Technical Qualification Program Self-Assessment Report - Nevada Site Office - 2009 Technical Qualification Program Self-Assessment Report - Richland Operations Office - 2014 FTCP Corrective Action Plan - Revision 1

  2. Administrative Records Schedule 1 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Administrative Records Schedule 1 Administrative Records Schedule 1 ADM-1 covers records of the Department and its contractors. The records include, employee concerns programs, labor agreements and negotiations, labor relations, academic and outreach programs, apprenticeship programs, job vacancies, unemployment compensation, recruitment and employee health PDF icon Administrative Records Schedule 1 More Documents & Publications ADMINISTRATIVE RECORDS SCHEDULE 1: PERSONNEL RECORDS

  3. Administrative Records Schedule: Communication Records | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Administrative Records Schedule: Communication Records Administrative Records Schedule: Communication Records The principal records documenting communication function PDF icon Administrative Records Schedule: Communication Records More Documents & Publications ADMINISTRATIVE RECORDS SCHEDULE 12: COMMUNICATIONS RECORDS ADM 12 PDF Communications Records

  4. Wholesale Power Rate Schedules | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rate Schedules » Wholesale Power Rate Schedules Wholesale Power Rate Schedules October 1, 2015 KP-AP-1-C Wholesale Power Rate Schedule Area: American Electric Power System: Kerr-Philpott October 1, 2015 KP-AP-2-C Wholesale Power Rate Schedule Area: American Electric Power System: Kerr-Philpott October 1, 2015 KP-AP-3-C Wholesale Power Rate Schedule Area: American Electric Power System: Kerr-Philpott October 1, 2015 CU-CC-1-J Wholesale Power Rate Schedule Area: Duke Energy Progress, Western

  5. Environmental surveillance master sampling schedule

    SciTech Connect (OSTI)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons.

  6. DOE Records Disposition Schedule Changes | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Records Disposition Schedule Changes DOE Records Disposition Schedule Changes Disposition Schedule Changes PDF icon DOE Records Disposition Schedule Changes More Documents & Publications DOE Administrative Records Schedules Changes DOERS Records Schedule Cross Index to DOE Administrative Records Disposition Schedules ADMINISTRATIVE RECORDS SCHEDULE 18: SECURITY, EMERGENCY PLANNING, AND SAFETY RECORDS

  7. Unidirectional ring lasers

    DOE Patents [OSTI]

    Hohimer, J.P.; Craft, D.C.

    1994-09-20

    Unidirectional ring lasers formed by integrating nonreciprocal optical elements into the resonant ring cavity is disclosed. These optical elements either attenuate light traveling in a nonpreferred direction or amplify light traveling in a preferred direction. In one preferred embodiment the resonant cavity takes the form of a circle with an S-shaped crossover waveguide connected to two points on the interior of the cavity such that light traveling in a nonpreferred direction is diverted from the cavity into the crossover waveguide and reinjected out of the other end of the crossover waveguide into the cavity as light traveling in the preferred direction. 21 figs.

  8. Unidirectional ring lasers

    DOE Patents [OSTI]

    Hohimer, John P.; Craft, David C.

    1994-01-01

    Unidirectional ring lasers formed by integrating nonreciprocal optical elements into the resonant ring cavity. These optical elements either attenuate light traveling in a nonpreferred direction or amplify light traveling in a preferred direction. In one preferred embodiment the resonant cavity takes the form of a circle with an S-shaped crossover waveguide connected to two points on the interior of the cavity such that light traveling in a nonpreferred direction is diverted from the cavity into the crossover waveguide and reinjected out of the other end of the crossover waveguide into the cavity as light traveling in the preferred direction.

  9. Microsoft Word - PoRiver Project Schedule - Letter to DOE_042807.doc

    Energy Savers [EERE]

    30, 2007 Lawrence Mansueti Office of Electricity Delivery and Energy Reliability U.S. Department of Energy Rm. 8H-033 1000 Independence Avenue Washington, D.C. 20585 Re: Potomac River Project Outage Schedule Clarification Dear Mr. Mansueti: I am writing to clarify the upcoming outage schedule for the Potomac River project and to explain certain discrepancies that are present in Pepco's most recent communications. 1 The monthly status report submitted to the Federal Energy Regulatory Commission

  10. Fermilab Recycler Ring: Technical design report. Revision 1.1

    SciTech Connect (OSTI)

    Jackson, G.

    1996-07-01

    This report describes the technical design of the Fermilab Recycler Ring. The purpose of the Recycler is to augment the luminosity increase anticipated from the implementation of the Fermi III upgrade project, which has as its main component the Fermilab Main Injector construction project. The Recycler is a fixed 8 GeV kinetic energy storage ring. It is located in the Main Injector tunnel directly above the Main Injector beamline, near the ceiling. The construction schedule calls for the installation of the Recycler ring before the installation shutdown of the Main Injector. This aggressive construction schedule is made possible by the exclusive use of permanent magnets in the ring lattice, removing the need for expensive conventional iron/copper magnet construction along with the related power supplies, cooling water system, and electrical safety systems. The location, operating energy, and mode of construction are chosen to minimize operational impacts on both Fermilab`s ongoing High Energy Physics program and the Main Injector construction project.

  11. Ring laser scatterometer

    DOE Patents [OSTI]

    Ackermann, Mark; Diels, Jean-Claude

    2005-06-28

    A scatterometer utilizes the dead zone resulting from lockup caused by scatter from a sample located in the optical path of a ring laser at a location where counter-rotating pulses cross. The frequency of one pulse relative to the other is varied across the lockup dead zone.

  12. Storage Ring Parameters

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Storage Ring Parameters Print General Parameters Parameter Value Beam particle electron Beam energy 1.9 GeV (1.0-1.9 GeV possible) Injection energy 1.9 GeV (1.0-1.9 GeV possible)...

  13. Beam Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Beam Status Print Loading... You can also view the Operations Group's Beam History archives

  14. Storage Ring | Advanced Photon Source

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The Electron Storage Ring The 7-GeV electrons are injected into the 1104-m-circumference storage ring, a circle of more than 1,000 electromagnets and associated equipment, located...

  15. DOE Administrative Records Schedules Changes | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Administrative Records Schedules Changes DOE Administrative Records Schedules Changes Changes posted to Administrative Records Schedules PDF icon DOE Administrative Records Schedules Changes More Documents & Publications DOE Records Disposition Schedule Changes ADMINISTRATIVE RECORDS SCHEDULE 18: SECURITY, EMERGENCY PLANNING, AND SAFETY RECORDS ADMINISTRATIVE RECORDS SCHEDULE 12: COMMUNICATIONS RECORDS

  16. Storage Ring Parameters

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Storage Ring Parameters Storage Ring Parameters Print General Parameters Parameter Value Beam particle electron Beam energy 1.9 GeV (1.0-1.9 GeV possible) Injection energy 1.9 GeV (1.0-1.9 GeV possible) Beam current (all operation is in top-off with ΔI/I ≤ 0.3%) 500 mA in multibunch mode 2 x 17.5 mA in two-bunch mode Filling pattern (multibunch mode) 256-320 bunches; possibility of one or two 5- to 6-mA "camshaft" bunches in filling gaps Bunch spacing: multibunch mode 2 ns Bunch

  17. 2014-2015 Power Rate Schedules

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 Power Rate Schedules and General Rate Schedule Provisions (FY 2014-2015) October 2013 United States Department of Energy Bonneville Power Administration 905 N.E. 11th Avenue...

  18. Wholesale Power Rate Schedules | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Power Rate Schedules October 1, 2011 CBR-1-H Wholesale Power Rate Schedule Area: Big Rivers and Henderson, KY System: CU October 1, 2011 CM-1-H Wholesale Power Rate...

  19. Graduate Program Time Limits and Work Schedules

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Time Limits and Work Schedules Graduate Program Time Limits and Work Schedules Point your career towards Los Alamos Lab: work with the best minds on the planet in an inclusive...

  20. Undergraduate Program Time Limits and Work Schedules

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Time Limits and Work Schedules Undergraduate Program Time Limits and Work Schedules Point your career towards Los Alamos Lab: work with the best minds on the planet in an inclusive...

  1. ALS Operating Schedule on Google Calendar

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ALS Operating Schedule on Google Calendar Print ALS Operating Schedule Your browser does not appear to support JavaScript, but this page needs to use JavaScript to display...

  2. ADMINISTRATIVE RECORDS SCHEDULE 12: COMMUNICATIONS RECORDS |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The principal records documenting communication functions include messenger service ... ADM 12 PDF Communications Records Administrative Records Schedule: Communication Records

  3. Multi-Year Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Year Schedule Multi-Year Schedule Table 2 presents DOE's currently scheduled rulemaking activities for energy conservation standards and test procedures. PDF icon multiyear_schedule_aug_2011.pdf More Documents & Publications 9th Semi-Annual Report to Congress on Appliance Energy Efficiency Rulemakings - Implementation Report: Energy Conservation Standards Activities 11th Semi-Annual Report to Congress on Appliance Energy Efficiency Rulemakings - Implementation Report: Energy Conservation

  4. ADMINISTRATIVE RECORDS SCHEDULE 17: CARTOGRAPHIC, AERIAL PHOTOGRAPHIC...

    Energy Savers [EERE]

    7: CARTOGRAPHIC, AERIAL PHOTOGRAPHIC, ARCHITECTURAL, ENGINEERING, AND FACILITY MANAGEMENT RECORDS ADMINISTRATIVE RECORDS SCHEDULE 17: CARTOGRAPHIC, AERIAL PHOTOGRAPHIC,...

  5. Inspection/Sampling Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Inspection/Sampling Schedule Inspection/Sampling Schedule Site Inspection and Water Sampling Schedules Note: The following schedules are subject to change without prior notice and will be updated periodically. Site Name Inspection Date Sampling Week Ambrosia Lake, NM, Disposal Site August 22, 2016 December 3, 2015 Bluewater, NM, Disposal Site August 22, 2016 December 2, 2015 May 9, 2016 BONUS, PR, Decommissioned Reactor Site FY 2017 No annual inspections N/A Burrell, PA, Disposal Site October

  6. ADMINISTRATIVE RECORDS SCHEDULE 5: BUDGET PREPARATION, PRESENTATION...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5: BUDGET PREPARATION, PRESENTATION, AND APPORTIONMENT ADMINISTRATIVE RECORDS SCHEDULE 5: BUDGET PREPARATION, PRESENTATION, AND APPORTIONMENT Budget and apportionment records ...

  7. ADMINISTRATIVE RECORDS SCHEDULE 5: BUDGET PREPARATION, PRESENTATION...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5: BUDGET PREPARATION, PRESENTATION, AND APPORTIONMENT RECORDS ADMINISTRATIVE RECORDS SCHEDULE 5: BUDGET PREPARATION, PRESENTATION, AND APPORTIONMENT RECORDS Budget and ...

  8. ADMINISTRATIVE RECORDS SCHEDULE 1: PERSONNEL RECORDS (Revision...

    Broader source: Energy.gov (indexed) [DOE]

    programs, job vacancies, unemployment compensation, recruitment and employee health ADM 10.pdf More Documents & Publications Administrative Records Schedule 1 ADMINISTRATIVE...

  9. 1998 SSRL Accelerator Physics Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 SSRL Accelerator Physics Schedule Proposal Deadline Schedule Announcement Experimental Period Duration Tue, Nov 11, 17:00 Wed, Nov 12, '97 17:00 Mon, Nov 17, '97 18:00-Wed, Nov 19, '97 02:00 32 hrs Mon, Dec 01, '97 17:00 Tue, Dec 02, '97 13:00 Mon, Dec 08, '97 06:00-Wed, Dec 10, '97 02:00 44 hrs Mon, Jan 05, 17:00 Tue, Jan 06, 13:00 Mon, Jan 12, 18:00-Wed, Jan 14, 02:00 32 hrs Fri, Jan 16, 17:00 Tue, Jan 20, 13:00 Mon, Jan 26, 06:00-Wed, Jan 28, 02:00 44 hrs Mon, Feb 02, 17:00 Tue, Feb 03,

  10. 1999 SSRL Accelerator Physics Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SSRL Accelerator Physics Schedule Proposal Deadline Schedule Announcement Experimental Period Duration Mon, Nov 30, '98 17:00 Tue, Dec 01, '98 13:00 Mon, Dec 07, '98 06:00-Wed, Dec 09, '98 02:00 44 hrs Mon, Jan 04, 17:00 Tue, Jan 05, 13:00 Mon, Jan 11, 18:00-Wed, Jan 13, 02:00 32 hrs Fri, Jan 15, 17:00 Tue, Jan 19, 13:00 Mon, Jan 25, 06:00-Wed, Jan 27, 02:00 44 hrs Mon, Feb 01, 17:00 Tue, Feb 02, 13:00 Tue, Feb 09, 18:00-Thu, Feb 11, 02:00 32 hrs Tue, Feb 16, 17:00 Wed, Feb 17, 17:00 Mon, Feb

  11. 2000 SSRL Accelerator Physics Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SSRL Accelerator Physics Schedule Proposal Deadline Schedule Announcement Experimental Period Duration Mon, Nov 08, '99 17:00 Tue, Nov 09, '99 13:00 Mon, Nov 15, '99 18:00-Wed, Nov 17, '99 02:00 32 hrs Mon, Nov 29, '99 17:00 Tue, Nov 30, '99 13:00 Mon, Dec 06, '99 06:00-Wed, Dec 08, '99 02:00 44 hrs Mon, Jan 03, 17:00 Tue, Jan 04, 13:00 Mon, Jan 10, 18:00-Wed, Jan 12, 02:00 32 hrs Fri, Jan 14, 17:00 Tue, Jan 18, 13:00 Mon, Jan 24, 06:00-Wed, Jan 26, 02:00 44 hrs Mon, Feb 14, 17:00 Tue, Feb 15,

  12. 2001 SSRL Accelerator Physics Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SSRL Accelerator Physics Schedule Proposal Deadline Schedule Announcement Experimental Period Duration Mon, Nov 06, '00 17:00 Tue, Nov 07, '00 13:00 Mon, Nov 13, '00 18:00-Wed, Nov 15, '00 02:00 32 hrs Mon, Dec 04, '00 17:00 Tue, Dec 05, '00 13:00 Mon, Dec 11, '00 06:00-Wed, Dec 13, '00 02:00 44 hrs Mon, Jan 01, 17:00 Tue, Jan 02, 13:00 Mon, Jan 08, 18:00-Wed, Jan 10, 02:00 32 hrs Fri, Jan 12, 12:00 Tue, Jan 16, 13:00 Mon, Jan 22, 06:00-Wed, Jan 24, 02:00 44 hrs Mon, Jan 29, 17:00 Tue, Jan 30,

  13. 2002 SSRL Accelerator Physics Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SSRL Accelerator Physics Schedule Proposal Deadline Schedule Announcement Experimental Period Duration Mon, Nov 05, '01 17:00 Tue, Nov 06, '01 13:00 Mon, Nov 12, '01 18:00-Wed, Nov 14, '01 02:00 32 hrs Mon, Dec 03, '01 17:00 Tue, Dec 04, '01 13:00 Mon, Dec 10, '01 06:00-Wed, Dec 12, '01 02:00 44 hrs Mon, Dec 17, '01 09:00 Tue, Dec 18, '01 13:00 Mon, Jan 07, 18:00-Wed, Jan 9, 02:00 32 hrs Mon, Jan 14, 12:00 Tue, Jan 15, 13:00 Tue, Jan 22, 06:00-Thu, Jan 24, 02:00 44 hrs Mon, Jan 28, 17:00 Tue,

  14. 2003 SSRL Accelerator Physics Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SSRL Accelerator Physics Schedule Proposal Deadline Schedule Announcement Experimental Period Duration Mon, Dec 02, '02 17:00 Tue, Dec 03, '02 13:00 Mon, Dec 09, '02 18:00-Wed, Dec 11, '02 02:00 32 hrs Tue, Jan 07, 09:00 Tue, Jan 07, 13:00 Mon, Jan 13, 18:00-Wed, Jan 15, 02:00 32 hrs Mon, Feb 03, 17:00 Tue, Feb 04, 17:00 Mon, Feb 10, 18:00-Wed, Feb 12, 02:00 32 hrs Mon, Feb 24, 17:00 Tue, Feb 25, 13:00 Mon, Mar 03, 18:00-Wed, Mar 05, 02:00 32 hrs SLAC SSRL SSRL Last Updated: 25 February 2003

  15. Environmental surveillance master sampling schedule

    SciTech Connect (OSTI)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program.

  16. FY 2016 PMCDP Training Schedule

    Energy Savers [EERE]

    Last Update February 29, 2016 1 | P a g e FY 2016 PMCDP Training Schedule Q1 FY 2016: Course Title Length Planned Delivery Timeframe Location/ Platform Equivalent Training Planning for Safety in Project Management FPM 408 CHRIS Code: 001035/0058 28 CLPs November (start) NA/desktop delivery None; DOE custom course required Facilitating Conflict Resolution FLD 141 CHRIS Code: 01558/0019 24 CLPs November 12(start) 22 completed NA/desktop delivery None; DOE custom course required Managing Contract

  17. 2015 Procurement Evaluation and Re-engineering Team (PERT) Schedule...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    15 Procurement Evaluation and Re-engineering Team (PERT) Schedule 2015 Procurement Evaluation and Re-engineering Team (PERT) Schedule PDF icon PERT Schedule 2015.pdf More Documents ...

  18. Replacement-2-A Wholesale Power Rate Schedule | Department of...

    Office of Environmental Management (EM)

    2-A Wholesale Power Rate Schedule Replacement-2-A Wholesale Power Rate Schedule Area: Replacement Energy System: Kerr-Philpott This rate schedule shall be available to public...

  19. Earth Week 2015 Schedule of Events | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Schedule of Events Schedule of Events for Energy Department Earth Week 2015 PDF icon doeearthday2015schedule.pdf More Documents & Publications DOE Headquarters Earth Day 2015...

  20. ADMINISTRATIVE RECORDS SCHEDULE 1: PERSONNEL RECORDS (Superseded) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy : PERSONNEL RECORDS (Superseded) ADMINISTRATIVE RECORDS SCHEDULE 1: PERSONNEL RECORDS (Superseded) The records include, employee concerns programs, labor agreements and negotiations, labor relations, academic and outreach programs, apprenticeship programs, job vacancies, unemployment compensation, recruitment and employee health PDF icon Administrative Records Schedule 1-Personnel Records.pdf More Documents & Publications ADMINISTRATIVE RECORDS SCHEDULE 2: PAYROLL

  1. Microsoft Word - Changes-to-Schedules _Recovered_

    Energy Savers [EERE]

    Changes-to-Schedules REV 5 DOE Administrative Records Schedules Changes Last revised: 12/10/2010 Date DOE Admin Schedule Item(s) Change Authorizing Document 9/15/10 - 12/10/2010 1-6, 9, 11-12, 14, 16-18, 22- 23 Various Removal of items at the end of each schedule for e-mail and word processing copies, which were added to the GRS in Transmittal Number 8. For schedules in which this item is located elsewhere and removal would cause changes in the sequence of item numbers, the item was changed to

  2. Edison Queues and Scheduling Policies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Queues and Policies Edison Queues and Scheduling Policies Users submit jobs to a partition and wait in line until nodes become available to run a job. NERSC's queue structures are intended to be fair and to allow jobs of various sizes to run efficiently. Note that the intended use of each system differs. Edison's purpose is to run large jobs, so the queue policy significantly favors large jobs using more than 682 nodes. If your workload requires smaller jobs (using less than 682 nodes), we

  3. Split ring containment attachment device

    DOE Patents [OSTI]

    Sammel, Alfred G.

    1996-01-01

    A containment attachment device 10 for operatively connecting a glovebag 200 to plastic sheeting 100 covering hazardous material. The device 10 includes an inner split ring member 20 connected on one end 22 to a middle ring member 30 wherein the free end 21 of the split ring member 20 is inserted through a slit 101 in the plastic sheeting 100 to captively engage a generally circular portion of the plastic sheeting 100. A collar potion 41 having an outer ring portion 42 is provided with fastening means 51 for securing the device 10 together wherein the glovebag 200 is operatively connected to the collar portion 41.

  4. Storage Ring Parameters

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Storage Ring Parameters Print General Parameters Parameter Value Beam particle electron Beam energy 1.9 GeV (1.0-1.9 GeV possible) Injection energy 1.9 GeV (1.0-1.9 GeV possible) Beam current (all operation is in top-off with ΔI/I ≤ 0.3%) 500 mA in multibunch mode 2 x 17.5 mA in two-bunch mode Filling pattern (multibunch mode) 256-320 bunches; possibility of one or two 5- to 6-mA "camshaft" bunches in filling gaps Bunch spacing: multibunch mode 2 ns Bunch spacing: two-bunch mode 328

  5. Storage Ring Parameters

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Storage Ring Parameters Print General Parameters Parameter Value Beam particle electron Beam energy 1.9 GeV (1.0-1.9 GeV possible) Injection energy 1.9 GeV (1.0-1.9 GeV possible) Beam current (all operation is in top-off with ΔI/I ≤ 0.3%) 500 mA in multibunch mode 2 x 17.5 mA in two-bunch mode Filling pattern (multibunch mode) 256-320 bunches; possibility of one or two 5- to 6-mA "camshaft" bunches in filling gaps Bunch spacing: multibunch mode 2 ns Bunch spacing: two-bunch mode 328

  6. Storage Ring Parameters

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Storage Ring Parameters Print General Parameters Parameter Value Beam particle electron Beam energy 1.9 GeV (1.0-1.9 GeV possible) Injection energy 1.9 GeV (1.0-1.9 GeV possible) Beam current (all operation is in top-off with ΔI/I ≤ 0.3%) 500 mA in multibunch mode 2 x 17.5 mA in two-bunch mode Filling pattern (multibunch mode) 256-320 bunches; possibility of one or two 5- to 6-mA "camshaft" bunches in filling gaps Bunch spacing: multibunch mode 2 ns Bunch spacing: two-bunch mode 328

  7. Storage Ring Parameters

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Photon Source Parameters Storage Ring Parameters Print General Parameters Parameter Value Beam particle electron Beam energy 1.9 GeV (1.0-1.9 GeV possible) Injection energy 1.9 GeV (1.0-1.9 GeV possible) Beam current (all operation is in top-off with ΔI/I ≤ 0.3%) 500 mA in multibunch mode 2 x 17.5 mA in two-bunch mode Filling pattern (multibunch mode) 256-320 bunches; possibility of one or two 5- to 6-mA "camshaft" bunches in filling gaps Bunch spacing: multibunch mode 2 ns Bunch

  8. Storage Ring Parameters

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Storage Ring Parameters Print General Parameters Parameter Value Beam particle electron Beam energy 1.9 GeV (1.0-1.9 GeV possible) Injection energy 1.9 GeV (1.0-1.9 GeV possible) Beam current (all operation is in top-off with ΔI/I ≤ 0.3%) 500 mA in multibunch mode 2 x 17.5 mA in two-bunch mode Filling pattern (multibunch mode) 256-320 bunches; possibility of one or two 5- to 6-mA "camshaft" bunches in filling gaps Bunch spacing: multibunch mode 2 ns Bunch spacing: two-bunch mode 328

  9. ADMINISTRATIVE RECORDS SCHEDULE 14: INFORMATIONAL SERVICES RECORDS |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 4: INFORMATIONAL SERVICES RECORDS ADMINISTRATIVE RECORDS SCHEDULE 14: INFORMATIONAL SERVICES RECORDS This schedule covers certain records pertaining to informational services performed by the Department in their day-to-day affairs and in their relations with the public, including records created in administering Freedom of Information Act (FOIA) and Privacy Act ) programs PDF icon ADMINISTRATIVE RECORDS SCHEDULE 14: INFORMATIONAL SERVICES RECORDS More Documents &

  10. ADMINISTRATIVE RECORDS SCHEDULE 14: INFORMATIONAL SERVICES RECORDS |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 4: INFORMATIONAL SERVICES RECORDS ADMINISTRATIVE RECORDS SCHEDULE 14: INFORMATIONAL SERVICES RECORDS This schedule covers certain records pertaining to informational services performed by the Department in their day-to-day affairs and in their relations with the public, including records created in administering Freedom of Information Act (FOIA) and Privacy Act ) programs. PDF icon ADMINISTRATIVE RECORDS SCHEDULE 14: INFORMATIONAL SERVICES RECORDS More Documents &

  11. SSRL Experimental Run Schedule | Stanford Synchrotron Radiation...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Experimental Run Schedule NOTICE TO SSRL USERS: We experienced a vacuum fault during SPEAR startup last week. Troubleshooting continues this week, which will delay the user...

  12. ADMINISTRATIVE RECORDS SCHEDULE 6: ACCOUNTABLE OFFICERS' ACCOUNTS...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This schedule covers accountable officers' returns and related records, including records under the cognizance of the General Accountability Office (GAO). PDF icon ADMINISTRATIVE ...

  13. Professional Skills and Technical Training Schedule

    Broader source: Energy.gov [DOE]

    Professional Skills and Technical Training Schedule lists all courses that are offered to DOE program offices, field sites, and national laboratories.

  14. AVLIS production plant project schedule and milestones

    SciTech Connect (OSTI)

    Not Available

    1984-11-15

    An AVLIS Production Plant Deployment Schedule for the engineering, procurement, and construction for both the Initial Increment of Production and the fully Activated Plant, has been developed by the project team consisting of Lawrence Livermore National Laboratory, Martin Marietta Energy Systems, Inc. with architect-engineer support from Bechtel National, Inc., Stone and Webster Engineering Corporation, and Westinghouse Corporation. The initial deployment phase consists of six separators modules and the three laser power amplifier modules consistent with the FY84 reference design with a name plate capacity of 5 million separative work units/yr followed by a full plant activation to approximately 13 million separative work units/yr. The AVLIS Production Plant project team's strategy for deployment schedule analysis focused on three schedule options: engineering limited schedule; authorization limited schedule; and funding limited project schedule. The three deployment schedule options developed by AVLIS project team have been classified in ranges such as an optimistic, rapid/moderate, or moderate/pessimistic based on the probability of meeting the individual schedule option's major milestones or program objectives of enriching uranium by the AVLIS process in an effective cost and schedule manner. 47 figures, 7 tables.

  15. ADMINISTRATIVE RECORDS SCHEDULE 17: CARTOGRAPHIC, AERIAL PHOTOGRAPHIC...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    activities. Many of these records have continuing historical value after they are no longer of use to the Department. This records schedule covers only disposable records

  16. JOBAID- WITHDRAWING FROM A SCHEDULED OFFERING

    Broader source: Energy.gov [DOE]

    The purpose of this job aid is to guide users through the step-by-step process of withdrawing from a scheduled offering.

  17. ADMINISTRATIVE RECORDS SCHEDULE 6: ACCOUNTABLE OFFICERS' ACCOUNTS...

    Broader source: Energy.gov (indexed) [DOE]

    OFFICERS' ACCOUNTS RECORDS More Documents & Publications ADMINISTRATIVE RECORDS SCHEDULE 6: ACCOUNTABLE OFFICERS' ACCOUNTS RECORDS Accountable Officers' Accounts Records ADM 6 PDF...

  18. CM-1-H Wholesale Power Rate Schedule

    Broader source: Energy.gov [DOE]

    Availability:This rate schedule shall be available to the South Mississippi Electric Power Association, Municipal Energy Agency of Mississippi, and Mississippi Delta Energy Agency (hereinafter...

  19. Schedules of Key Environmental Impact Statements

    Broader source: Energy.gov [DOE]

    This document graphically displays the milestone dates and projected schedules of key Environmental Impact Statements (updated monthly). This chart represents anticipated activity and is not a...

  20. Environmental surveillance master sampling schedule

    SciTech Connect (OSTI)

    Bisping, L E

    1992-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. Samples for radiological analyses include Air-Particulate Filter, gases and vapor; Water/Columbia River, Onsite Pond, Spring, Irrigation, and Drinking; Foodstuffs/Animal Products including Whole Milk, Poultry and Eggs, and Beef; Foodstuffs/Produce including Leafy Vegetables, Vegetables, and Fruit; Foodstuffs/Farm Products including Wine, Wheat and Alfalfa; Wildlife; Soil; Vegetation; and Sediment. Direct Radiation Measurements include Terrestrial Locations, Columbia River Shoreline Locations, and Onsite Roadway, Railway and Aerial, Radiation Surveys.

  1. NPDF status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NPDF INSTRUMENT STATUS Waiting for runs .. Last update: Fri Mar 27 04:43:30 2015 NPDF RECENT DATA PLOTTING Select plot: GSAS - PDF

  2. SMARTS status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SMARTS INSTRUMENT STATUS Instrument Status (Last updated: 2016/03/02 14:04:07) Run Number: 97106 Title: Adams Sample 6-4 after heat treat to 1000C [abso strain -10.000 Run Status: ended Last Script Activity: 2016/02/28 20:05:52: End run 97106; mah 300000 abso strain -10.000 100.0 * * * * * * View full script Next Script Command: N/A Proposal#: 7039 Sample#: 2004061 MAH: 302227 Monitor: 132724 Beam Current: 0 Shutter Status: CLSD Used disk space on /home: 59% Used disk space on /disk2: 73% Crate

  3. Streams-C Scheduler and Library

    Energy Science and Technology Software Center (OSTI)

    2001-12-04

    The scheduler accepts a preprocessed C program with optional Streams-C extensions. It translates it to a normalized form with additional information for scheduling it on a reconfigurable architecture. The resulting file is accepted by the Streams-C VHDL generator, not part of this package.

  4. Ion Rings for Magnetic Fusion

    SciTech Connect (OSTI)

    Greenly, John, B.

    2005-07-31

    This Final Technical Report presents the results of the program, Ion Rings for Magnetic Fusion, which was carried out under Department of Energy funding during the period August, 1993 to January, 2005. The central objective of the program was to study the properties of field-reversed configurations formed by ion rings. In order to reach this objective, our experimental program, called the Field-reversed Ion Ring Experiment, FIREX, undertook to develop an efficient, economical technology for the production of field-reversed ion rings. A field-reversed configuration (FRC) in which the azimuthal (field-reversing) current is carried by ions with gyro-radius comparable to the magnetic separatrix radius is called a field-reversed ion ring. A background plasma is required for charge neutralization of the ring, and this plasma will be confined within the ring's closed magnetic flux. Ion rings have long been of interest as the basis of compact magnetic fusion reactors, as the basis for a high-power accelerator for an inertial fusion driver, and for other applications of high power ion beams or plasmas of high energy density. Specifically, the FIREX program was intended to address the longstanding question of the contribution of large-orbit ions to the observed stability of experimental FRCs to the MHD tilt mode. Typical experimental FRCs with s {approx} 2-4, where s is the ratio of separatrix radius to ion gyro-radius, have been stable to tilting, but desired values for a fusion reactor, s > 20, should be unstable. The FIREX ring would consist of a plasma with large s for the background ions, but with s {approx} 1 for the ring ions. By varying the proportions of these two populations, the minimum proportion of large-orbit ions necessary for stability could be determined. The incorporation of large-orbit ions, perhaps by neutral-beam injection, into an FRC has been advanced for the purpose of stabilizing, heating, controlling angular momentum, and aiding the formation of a reactor-scale FRC, and the FIREX program was intended to test the ideas behind this approach. We will describe in this report the technological development path and advances in physics understanding that allowed FIREX to reach a regime in which ion rings were reproducibly created with up to about half the current necessary to produce field reversal. Unfortunately, the experiments were limited to this level by a fundamental, unanticipated aspect of the physics of strong ion rings in plasma. The FIREX ring is a strongly anisotropic, current-carrying population of ions moving faster than the Alfven speed in the background plasma. The rapidly changing ring current excites very large-amplitude Alfven waves in the plasma, and these waves strongly affect the ring, causing rapid energy loss in a way that is not compatible with the success of the ring trapping scenario around which FIREX was designed. The result was that FIREX rings were always very short-lived. We will discuss the implication of these results for possible future use of large-orbit ions in FRCs. In short, it appears that a certain range of the parameters characterizing the ring Alfven mach number and distribution function must be avoided to allow the existence of a long-lived energetic ion component in an FRC. This report will explain why FIREX experimental results cannot be directly scaled to quantitatively predict this range for a particular FRC configuration. This will require accurate, three-dimensional simulations. FIREX results do constitute a very good dataset for validating such a code, and simulations already carried out during this program provide a guide to the important physics involved.

  5. Reflex ring laser amplifier system

    DOE Patents [OSTI]

    Summers, Mark A.

    1985-01-01

    A laser pulse is injected into an unstable ring resonator-amplifier structure. Inside this resonator the laser pulse is amplified, spatially filtered and magnified. The laser pulse is recirculated in the resonator, being amplified, filtered and magnified on each pass. The magnification is chosen so that the beam passes through the amplifier in concentric non-overlapping regions similar to a single pass MOPA. After a number of passes around the ring resonator the laser pulse is spatially large enough to exit the ring resonator system by passing around an output mirror.

  6. ADMINISTRATIVE RECORDS SCHEDULE 9: TRAVEL AND TRANSPORTATION RECORDS |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 9: TRAVEL AND TRANSPORTATION RECORDS ADMINISTRATIVE RECORDS SCHEDULE 9: TRAVEL AND TRANSPORTATION RECORDS This schedule covers records documenting the movement of goods and persons under Government orders PDF icon ADMINISTRATIVE RECORDS SCHEDULE 9: TRAVEL AND TRANSPORTATION RECORDS More Documents & Publications ADMINISTRATIVE RECORDS SCHEDULE 9: TRAVEL AND TRANSPORTATION RECORDS (Revision 2) ADMINISTRATIVE RECORDS SCHEDULE 6: ACCOUNTABLE OFFICERS' ACCOUNTS RECORDS

  7. Power Ring LLC | Open Energy Information

    Open Energy Info (EERE)

    Power Ring LLC Place: Goleta, California Zip: 93117 Product: Power Ring is a power storage technology developer working on technology developed by parent firm LaunchPoint...

  8. NRC comprehensive records disposition schedule. Revision 3

    SciTech Connect (OSTI)

    1998-02-01

    Title 44 US Code, ``Public Printing and Documents,`` regulations issued by the General Service Administration (GSA) in 41 CFR Chapter 101, Subchapter B, ``Management and Use of Information and Records,`` and regulations issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter 12, Subchapter B, ``Records Management,`` require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA`s General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 3, contains ``NRC`s Comprehensive Records Disposition Schedule,`` and the original authorized approved citation numbers issued by NARA. Rev. 3 incorporates NARA approved changes and additions to the NRC schedules that have been implemented since the last revision dated March, 1992, reflects recent organizational changes implemented at the NRC, and includes the latest version of NARA`s General Records Schedule (dated August 1995).

  9. Ring resonant cavities for spectroscopy

    DOE Patents [OSTI]

    Zare, R.N.; Martin, J.; Paldus, B.A.; Xie, J.

    1999-06-15

    Ring-shaped resonant cavities for spectroscopy allow a reduction in optical feedback to the light source, and provide information on the interaction of both s- and p-polarized light with samples. A laser light source is locked to a single cavity mode. An intracavity acousto-optic modulator may be used to couple light into the cavity. The cavity geometry is particularly useful for Cavity Ring-Down Spectroscopy (CRDS). 6 figs.

  10. Ring resonant cavities for spectroscopy

    DOE Patents [OSTI]

    Zare, Richard N.; Martin, Juergen; Paldus, Barbara A.; Xie, Jinchun

    1999-01-01

    Ring-shaped resonant cavities for spectroscopy allow a reduction in optical feedback to the light source, and provide information on the interaction of both s- and p-polarized light with samples. A laser light source is locked to a single cavity mode. An intracavity acousto-optic modulator may be used to couple light into the cavity. The cavity geometry is particularly useful for Cavity Ring-Down Spectroscopy (CRDS).

  11. Collar nut and thrust ring

    DOE Patents [OSTI]

    Lowery, Guy B.

    1991-01-01

    A collar nut comprises a hollow cylinder having fine interior threads at one end for threadably engaging a pump mechanical seal assembly and an inwardly depending flange at the other end. The flange has an enlarged portion with a groove for receiving an O-ring for sealing against the intrusion of pumpage from the exterior. The enlarged portion engages a thrust ring about the pump shaft for crushing a hard O-ring, such as a graphite O-ring. The hard O-ring seals the interior of the mechanical seal assembly and pump housing against the loss of lubricants or leakage of pumpage. The fine threads of the hollow cylinder provide the mechanical advantage for crushing the hard O-ring evenly and easily with a hand tool from the side of the collar nut rather than by tightening a plurality of bolts from the end and streamlines the exterior surface of the mechanical seal. The collar nut avoids the spatial requirements of bolt heads at the end of a seal and associated bolt head turbulence.

  12. CC-1-I Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CC-1-I Wholesale Power Rate Schedule CC-1-I Wholesale Power Rate Schedule Area: Carolina Power & Light Company, Western Division System: CU This rate schedule shall be available to...

  13. CSI-1-H Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CSI-1-H Wholesale Power Rate Schedule CSI-1-H Wholesale Power Rate Schedule Area: Southern Illinois System: CU This rate schedule shall be available to Southern Illinois Power ...

  14. CEK-1-H Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CEK-1-H Wholesale Power Rate Schedule CEK-1-H Wholesale Power Rate Schedule Area: East Kentucky System: CU This rate schedule shall be available to East Kentucky Power Cooperative ...

  15. CTV-1-H Wholesale Power Rate Schedule | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    TVA. Document Available for Download PDF icon CTV-1-H Rate Schedule More Documents & Publications CTVI-1-A Wholesale Power Rate Schedule CEK-1-H Wholesale Power Rate Schedule CM

  16. CBR-1-H Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CBR-1-H Wholesale Power Rate Schedule CBR-1-H Wholesale Power Rate Schedule Area: Big Rivers and Henderson, KY System: CU This rate schedule shall be available to Big Rivers ...

  17. CM-1-H Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CM-1-H Wholesale Power Rate Schedule CM-1-H Wholesale Power Rate Schedule Area: MEAM, MDEA, and SMEPA System: CU This rate schedule shall be available to the South Mississippi ...

  18. VA-3-B Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3-B Wholesale Power Rate Schedule VA-3-B Wholesale Power Rate Schedule Area: Virginia Power System: Kerr-Philpott This rate schedule shall be available to public bodies and...

  19. NC-1-B Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    NC-1-B Wholesale Power Rate Schedule NC-1-B Wholesale Power Rate Schedule Area: Virginia PowerCP&L System: Kerr-Philpott This rate schedule shall be available to public bodies and...

  20. VA-4-B Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4-B Wholesale Power Rate Schedule VA-4-B Wholesale Power Rate Schedule Area: Virginia Power System: Kerr-Philpott This rate schedule shall be available to public bodies and...

  1. VA-1-B Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1-B Wholesale Power Rate Schedule VA-1-B Wholesale Power Rate Schedule Area: Virginia Power System: Kerr-Philpott This rate schedule shall be available to public bodies and...

  2. VA-2-B Wholesale Power Rate Schedule | Department of Energy

    Office of Environmental Management (EM)

    2-B Wholesale Power Rate Schedule VA-2-B Wholesale Power Rate Schedule Area: Virginia Power System: Kerr-Philpott This rate schedule shall be available to public bodies and...

  3. CSI-1-H Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CSI-1-H Wholesale Power Rate Schedule CSI-1-H Wholesale Power Rate Schedule Area: Southern Illinois System: CU This rate schedule shall be available to Southern Illinois Power...

  4. JW-2-F Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2-F Wholesale Power Rate Schedule JW-2-F Wholesale Power Rate Schedule Area: Florida Power Corporation System: Jim Woodruff This rate schedule shall be available to the Florida ...

  5. Crosswalk between DOERS and Admin Schedules

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2/22/00 Cross-Walk -DOERS to Admin Sched rev2.wpd DOERS Records Schedule Cross Index to DOE Administrative Records Disposition Schedules DOERS Item Number Description of Records DOE Administrative or Programmatic Schedule Number / Item NARA Case Number DOERS 1, Medical, Health and Safety Records DOERS 1, Item 1a Safety Management Records DOE Admin18, Item 11.1a, NC-326-75-2 DOERS 1, item 1 (b, c, d, & e) Safety Management Records DOE Admin 18, item 11.1 (c, d, e & f) II NNA-1023(2) II

  6. CK-1-H Wholesale Power Rate Schedule | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    quantities. Document Available for Download PDF icon CK-1-H Rate Schedule More Documents & Publications CBR-1-H Wholesale Power Rate Schedule CTV-1-H Wholesale Power Rate ...

  7. Schedule of Events - Combustion Energy Frontier Research Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Schedule of Events Schedule of Events This will be available a week before the summer school. © 2016 The Trustees of Princeton University Last update: February 12

  8. ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: SPACE AND MAINTENANCE RECORDS ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS This schedule provides for the disposal of all copies, wherever located in the ...

  9. Schedule and Information for Small Business Innovation Research...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Schedule and Information for Small Business Innovation Research and Small Business Technology Transfer Program Applicants Schedule and Information for Small Business Innovation ...

  10. BTO Catalyst Seeks Entries, Webinars and Jamathons Scheduled...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Catalyst Seeks Entries, Webinars and Jamathons Scheduled BTO Catalyst Seeks Entries, Webinars and Jamathons Scheduled July 20, 2015 - 1:29pm Addthis This funding opportunity is ...

  11. AP-3-B Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3-B Wholesale Power Rate Schedule AP-3-B Wholesale Power Rate Schedule Area: American ... American Electric Power Service Corporation (hereinafter called the Company), PJM ...

  12. AP-1-B Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1-B Wholesale Power Rate Schedule AP-1-B Wholesale Power Rate Schedule Area: American ... American Electric Power Service Corporation (hereinafter called the Company), the ...

  13. AP-2-B Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2-B Wholesale Power Rate Schedule AP-2-B Wholesale Power Rate Schedule Area: American ... American Electric Power Service Corporation (hereinafter called the Company), the ...

  14. AP-4-B Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4-B Wholesale Power Rate Schedule AP-4-B Wholesale Power Rate Schedule Area: American ... of American Electric Power Service Corporation (hereinafter called the Company) and ...

  15. Topic Index to the DOE Administrative Records Disposition Schedules...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Topic Index to the DOE Administrative Records Disposition Schedules Topic Index to the DOE Administrative Records Disposition Schedules Topic Index to the DOE Administrative...

  16. PROCEDURE FOR PREPARING RECORDS INVENTORY AND DISPOSITION SCHEDULES...

    Energy Savers [EERE]

    records inventory and disposition schedules PDF icon PROCEDURE FOR PREPARING RECORDS INVENTORY AND DISPOSITION SCHEDULES (RIDS) More Documents & Publications DOE F 1324.10...

  17. Hopper scheduled maintenance tomorrow (Sept 19) and /project...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    scheduled maintenance tomorrow (Sept 19) and project outage Hopper scheduled maintenance tomorrow (Sept 19) and project outage September 18, 2012 by Helen He There will be a...

  18. EVMS Training Snippet: 3.3 Schedule Guidance and Resources |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Schedule Guidance and Resources EVMS Training Snippet: 3.3 Schedule Guidance and Resources This EVMS Training Snippet, sponsored by the Office of Project Management (PM) provides...

  19. EM Quality Assurance Assessment Schedule FY 2010 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FY 2010 EM Quality Assurance Assessment Schedule FY 2010 Attached for planning and coordination purposes is the updated Quality Assurance (QA) assessment schedule for the...

  20. ADMINISTRATIVE RECORDS SCHEDULE 2: PAYROLL AND PAY ADMINISTRATION...

    Broader source: Energy.gov (indexed) [DOE]

    Documents & Publications ADMINISTRATIVE RECORDS SCHEDULE 2: PAYROLL AND PAY ADMINISTRATION RECORDS ADMINISTRATIVE RECORDS SCHEDULE 6: ACCOUNTABLE OFFICERS' ACCOUNTS RECORDS ADM 6...

  1. ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    RECORDS COMMON TO MOST OFFICES ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES This schedule covers those administrative management activities not covered by ...

  2. ADMINISTRATIVE RECORDS SCHEDULE 17: CARTOGRAPHIC, AERIAL PHOTOGRAPHIC,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ARCHITECTURAL, ENGINEERING, AND FACILITY MANAGEMENT RECORDS | Department of Energy activities. Many of these records have continuing historical value after they are no longer of use to the Department. This records schedule covers only disposable records

  3. This document is scheduled to be...

    Energy Savers [EERE]

    document is scheduled to be published in the Federal Register on 08212015 and available online at http:federalregister.gova2015-20742, and on FDsys.gov BILLING CODE ...

  4. Microsoft Word - May-meeting-schedule-public

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Meeting May 15, 2012 Meeting schedule: 08:00 - 0:830 - Welcome and introductions - Don G., Robert T. and subcommittee members 08:30 - 0:915 - Mission, Vision, and Research - T....

  5. DOE Announces New WIPP Tour Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    is being developed for visitor viewing at the Skeen-Whitlock Building, 4021 National Parks Highway in Carlsbad. Anyone interested in scheduling a tour of WIPP is encouraged to...

  6. Double acting stirling engine piston ring

    DOE Patents [OSTI]

    Howarth, Roy B.

    1986-01-01

    A piston ring design for a Stirling engine wherein the contact pressure between the piston and the cylinder is maintained at a uniform level, independent of engine conditions through a balancing of the pressure exerted upon the ring's surface and thereby allowing the contact pressure on the ring to be predetermined through the use of a preloaded expander ring.

  7. Scheduled Maintenance Periods | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Scheduled Maintenance Periods The CNM holds three maintenance periods per year. During these times certain CNM facilities may not be available for user activities. The Sector 26 beamline will not be available, the High-Performance Computing Cluster and nanofabrication facilities often are not available, and other facilities may undergo maintenance for only one or two days. Please contact your CNM Scientific Contact prior to arrival and plan your work visits and schedules accordingly. To better

  8. Transforming PV Installations toward Dispatchable, Schedulable Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Solutions | Department of Energy Transforming PV Installations toward Dispatchable, Schedulable Energy Solutions Transforming PV Installations toward Dispatchable, Schedulable Energy Solutions Advanced Energy logo.png -- This project is inactive -- Advanced Energy (AE) will address three important needs in the further deployment of photovoltaic (PV) systems: 1) demonstrating and commercializing a new anti-islanding method utilizing Phasor Measurement Units (PMUs), 2) demonstrating a set of

  9. Advanced Reactors Transition Program Resource Loaded Schedule

    SciTech Connect (OSTI)

    BOWEN, W.W.

    1999-11-08

    The Advanced Reactors Transition (ART) Resource Loaded Schedule (RLS) provides a cost and schedule baseline for managing the project elements within the ART Program. The Fast Flux Test Facility (FFTF) activities are delineated through the end of FY 2000, assuming continued standby. The Nuclear Energy (NE) Legacies and Plutonium Recycle Test Reactor (PRTR) activities are delineated through the end of the deactivation process. This document reflects the 1 Oct 1999 baseline.

  10. Advanced Reactors Transition Program Resource Loaded Schedule

    SciTech Connect (OSTI)

    GANTT, D.A.

    2000-01-12

    The Advanced Reactors Transition (ART) Resource Loaded Schedule (RLS) provides a cost and schedule baseline for managing the project elements within the ART Program. The Fast Flux Test Facility (FETF) activities are delineated through the end of FY 2000, assuming continued standby. The Nuclear Energy (NE) Legacies and Plutonium Recycle Test Reactor (PRTR) activities are delineated through the end of the deactivation process. This revision reflects the 19 Oct 1999 baseline.

  11. Undergraduate Program Time Limits and Work Schedules

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Time Limits and Work Schedules Undergraduate Program Time Limits and Work Schedules Point your career towards Los Alamos Lab: work with the best minds on the planet in an inclusive environment that is rich in intellectual vitality and opportunities for growth. Contact Student Programs (505) 665-0987 Email Time limits The length of participation in the undergraduate program is limited to a maximum of six years for students pursuing a bachelor's degree and three years for students pursuing an

  12. Concentric ring flywheel without expansion separators

    DOE Patents [OSTI]

    Kuklo, T.C.

    1999-08-24

    A concentric ring flywheel wherein the adjacent rings are configured to eliminate the need for differential expansion separators between the adjacent rings. This is accomplished by forming a circumferential step on an outer surface of an inner concentric ring and forming a matching circumferential step on the inner surface of an adjacent outer concentric ring. During operation the circumferential steps allow the rings to differentially expand due to the difference in the radius of the rings without the formation of gaps therebetween, thereby eliminating the need for expansion separators to take up the gaps formed by differential expansion. 3 figs.

  13. Concentric ring flywheel without expansion separators

    DOE Patents [OSTI]

    Kuklo, Thomas C.

    1999-01-01

    A concentric ring flywheel wherein the adjacent rings are configured to eliminate the need for differential expansion separators between the adjacent rings. This is accomplished by forming a circumferential step on an outer surface of an inner concentric ring and forming a matching circumferential step on the inner surface of an adjacent outer concentric ring. During operation the circumferential steps allow the rings to differentially expand due to the difference in the radius of the rings without the formation of gaps therebetween, thereby eliminating the need for expansion separators to take up the gaps formed by differential expansion.

  14. Quarterly report on program cost and schedule, third quarter FY 1990

    SciTech Connect (OSTI)

    1990-10-01

    This report is intended to provide a summary of the cost and schedule performance for the Civilian Radioactive Waste Management Program. Historical and current cost profiles (extracted from final Financial Information System (FIS) reports) are presented for each of the major program elements. Also included in this report is the status of the Nuclear Waste Fund revenues and disbursements. This report includes data through June 1990. 1 fig.

  15. ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 1: SPACE AND MAINTENANCE RECORDS ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS This schedule provides for the disposal of all copies, wherever located in the Department, of records relating to space and maintenance PDF icon ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS More Documents & Publications ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE

  16. ADMINISTRATIVE RECORDS SCHEDULE 21: AUDIOVISUAL RECORDS | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy AUDIOVISUAL RECORDS ADMINISTRATIVE RECORDS SCHEDULE 21: AUDIOVISUAL RECORDS This schedule covers audiovisual and related records created by or for Department and those acquired in the normal course of business PDF icon ADMINISTRATIVE RECORDS SCHEDULE 21: AUDIOVISUAL RECORDS More Documents & Publications ADMINISTRATIVE RECORDS SCHEDULE 21:AUDIOVISUAL RECORDS (Revision 1)

  17. ADMINISTRATIVE RECORDS SCHEDULE 21:AUDIOVISUAL RECORDS (Revision 1) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy AUDIOVISUAL RECORDS (Revision 1) ADMINISTRATIVE RECORDS SCHEDULE 21:AUDIOVISUAL RECORDS (Revision 1) This schedule covers audiovisual and related records created by or for Department and those acquired in the normal course of business. PDF icon ADMINISTRATIVE RECORDS SCHEDULE 21:AUDIOVISUAL RECORDS (Revision 1) More Documents & Publications ADMINISTRATIVE RECORDS SCHEDULE 21: AUDIOVISUAL RECORDS

  18. ADMINISTRATIVE RECORDS SCHEDULE 6: ACCOUNTABLE OFFICERS' ACCOUNTS RECORDS |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 6: ACCOUNTABLE OFFICERS' ACCOUNTS RECORDS ADMINISTRATIVE RECORDS SCHEDULE 6: ACCOUNTABLE OFFICERS' ACCOUNTS RECORDS This schedule covers accountable officers' returns and related records, including records under the cognizance of the General Accountability Office (GAO). PDF icon ADMINISTRATIVE RECORDS SCHEDULE 6: ACCOUNTABLE OFFICERS' ACCOUNTS RECORDS More Documents & Publications ADMINISTRATIVE RECORDS SCHEDULE 6: ACCOUNTABLE OFFICERS' ACCOUNTS RECORDS Accountable

  19. Conical O-ring seal

    DOE Patents [OSTI]

    Chalfant, Jr., Gordon G.

    1984-01-01

    A shipping container for radioactive or other hazardous materials which has a conical-shaped closure containing grooves in the conical surface thereof and an O-ring seal incorporated in each of such grooves. The closure and seal provide a much stronger, tighter and compact containment than with a conventional flanged joint.

  20. Conical O-ring seal

    DOE Patents [OSTI]

    Chalfant, G.G. Jr.

    A shipping container for radioactive or other hazardous materials has a conical-shaped closure containing grooves in the conical surface thereof and an O-ring seal incorporated in each of such grooves. The closure and seal provide a much stronger, tighter and compact containment than with a conventional flanged joint.

  1. Status | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Status Status PDF icon Status More Documents & Publications DOE O 206.2 Identity, Credential, and Access Management (ICAM) ICAM Workshop Audit Report: IG-0860

  2. Cavity-locked ring down spectroscopy

    DOE Patents [OSTI]

    Zare, Richard N.; Paldus, Barbara A.; Harb, Charles C.; Spence, Thomas

    2000-01-01

    Distinct locking and sampling light beams are used in a cavity ring-down spectroscopy (CRDS) system to perform multiple ring-down measurements while the laser and ring-down cavity are continuously locked. The sampling and locking light beams have different frequencies, to ensure that the sampling and locking light are decoupled within the cavity. Preferably, the ring-down cavity is ring-shaped, the sampling light is s-polarized, and the locking light is p-polarized. Transmitted sampling light is used for ring-down measurements, while reflected locking light is used for locking in a Pound-Drever scheme.

  3. Exhibit D: Mirant Potomac River Schedule of Operations: January and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    February 2006 | Department of Energy Operations: January and February 2006 Exhibit D: Mirant Potomac River Schedule of Operations: January and February 2006 Docket No. EO-05-01. Exhibit D: Mirant Potomac River Schedule of Operations, January and February 2006 PDF icon Exhibit D: Mirant Potomac River Schedule of Operations More Documents & Publications Exhibit D: Mirant Potomac River Schedule of Unit Operations: January - March 2006 Exhibit D: Mirant Potomac River Schedule of Unit

  4. Audit/Investigative Records Schedule (Revision 2) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Audit/Investigative Records Schedule (Revision 2) Audit/Investigative Records Schedule (Revision 2) This schedule covers both records associated with investigations other than those performed by the Office of the Inspector General (OIG) as well as records created by the Department's OIG investigations. PDF icon Audit/Investigative Records Schedule (Revision 2) More Documents & Publications Audit/Investigation Records ADMINISTRATIVE RECORDS SCHEDULE 18: SECURITY, EMERGENCY PLANNING, AND

  5. DOE RECORDS SCHEDULE FOR ENVIRONMENTAL RECORDS | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    RECORDS SCHEDULE FOR ENVIRONMENTAL RECORDS DOE RECORDS SCHEDULE FOR ENVIRONMENTAL RECORDS This schedule provides for the disposition of U.S. Department of Energy (DOE) records created to comply with or needed to support compliance with Federal environmental laws and implementing regulation PDF icon DOE RECORDS SCHEDULE FOR ENVIRONMENTAL RECORDS More Documents & Publications ADMINISTRATIVE RECORDS SCHEDULE 18: SECURITY, EMERGENCY PLANNING, AND SAFETY RECORDS Security, Emergency Planning &

  6. Santee-1-E Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    1-E Wholesale Power Rate Schedule Santee-1-E Wholesale Power Rate Schedule Area: Central, Bamberg, and Georgetown System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter call the Customer) in South Carolina to whom power may be wheeled and scheduled pursuant to contracts between the Government and South Carolina Public Service Authority (hereinafter called the Authority). This rate schedule shall be applicable

  7. Santee-3-E Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    3-E Wholesale Power Rate Schedule Santee-3-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter call the Customer) in South Carolina to whom power may be scheduled pursuant to contracts between the Government and South Carolina Public Service Authority (hereinafter called the Authority). This rate schedule shall be applicable to the sale at wholesale of power and

  8. ADMINISTRATIVE RECORDS SCHEDULE 9: TRAVEL AND TRANSPORTATION RECORDS

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (Revision 2) | Department of Energy 9: TRAVEL AND TRANSPORTATION RECORDS (Revision 2) ADMINISTRATIVE RECORDS SCHEDULE 9: TRAVEL AND TRANSPORTATION RECORDS (Revision 2) This schedule covers records documenting the movement of goods and persons under Government orders. PDF icon ADMINISTRATIVE RECORDS SCHEDULE 9: TRAVEL AND TRANSPORTATION RECORDS (Revision 2) More Documents & Publications ADMINISTRATIVE RECORDS SCHEDULE 9: TRAVEL AND TRANSPORTATION RECORDS ADMINISTRATIVE RECORDS SCHEDULE 6:

  9. Pump-2 Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    2 Wholesale Power Rate Schedule Pump-2 Wholesale Power Rate Schedule Area: Carters & Russell Pumping-Self Schedulers System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives who provide their own scheduling arrangement and elect to allow Southeastern to use a portion of their allocation for pumping (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, Florida, South Carolina, or North Carolina to whom

  10. SOCO-3-E Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    3-E Wholesale Power Rate Schedule SOCO-3-E Wholesale Power Rate Schedule Area: MEAG, Dalton System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, and Florida to whom power may be scheduled pursuant to contracts between the Government and Southern Company Services, Incorporated (hereinafter called the Company) and the Customer. This rate schedule shall be

  11. Fault-tolerant dynamic task graph scheduling

    SciTech Connect (OSTI)

    Kurt, Mehmet C.; Krishnamoorthy, Sriram; Agrawal, Kunal; Agrawal, Gagan

    2014-11-16

    In this paper, we present an approach to fault tolerant execution of dynamic task graphs scheduled using work stealing. In particular, we focus on selective and localized recovery of tasks in the presence of soft faults. We elicit from the user the basic task graph structure in terms of successor and predecessor relationships. The work stealing-based algorithm to schedule such a task graph is augmented to enable recovery when the data and meta-data associated with a task get corrupted. We use this redundancy, and the knowledge of the task graph structure, to selectively recover from faults with low space and time overheads. We show that the fault tolerant design retains the essential properties of the underlying work stealing-based task scheduling algorithm, and that the fault tolerant execution is asymptotically optimal when task re-execution is taken into account. Experimental evaluation demonstrates the low cost of recovery under various fault scenarios.

  12. Weekly Natural Gas Storage Report Schedule

    Weekly Natural Gas Storage Report (EIA)

    Weekly Natural Gas Storage Report Schedule Holiday Release Schedule The standard release time and day of the week will be at 10:30 a.m. (Eastern time) on Thursdays with the following exceptions. All times are Eastern. Alternate Release Date Release Day Release Time Holiday 12/31/2014 Wednesday 12:00 p.m. 1/1/2015 (Thursday) is New Year's Day 11/13/2015 Friday 10:30 a.m. 11/11/2015 (Wednesday) is Veteran's Day 11/25/2015 Wednesday 12:00 p.m. 11/26/2015 (Thursday) is Thanksgiving Day 11/23/2016

  13. High School Schedule | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Schedule January 23, 2016 SCHEDULE Location: Engineering Building, Iowa State University campus, Ames, Iowa 7:30 a.m. Registration and Continental Breakfast, Hoover Hall atrium 8:00 a.m. Opening Ceremonies, 2055 Hoover Hall 8:30-11:00 Round-Robin competition (Hoover, Howe & Pearson Halls) 11:00 Announcements, 2055 Hoover Hall 11:15 Tie-breaker round if needed 11:30 - 12:30 Lunch (Union Drive Community Center - tickets provided) 12:30-4:30 p.m. Double-elimination competition (Howe and Hoover

  14. Graduate Program Time Limits and Work Schedules

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Time Limits and Work Schedules Graduate Program Time Limits and Work Schedules Point your career towards Los Alamos Lab: work with the best minds on the planet in an inclusive environment that is rich in intellectual vitality and opportunities for growth. Contact Student Programs (505) 665-0987 Email Time Limits The length of participation in the graduate program is limited as follows: With a bachelor's pursuing a master's degree: 4 years With a bachelor's pursuing a PhD: 7 years With a master's

  15. Ring Energy sro | Open Energy Information

    Open Energy Info (EERE)

    Ring Energy sro Jump to: navigation, search Name: Ring Energy sro Place: Most, Czech Republic Zip: 434 01 Product: Czech developer operating a 2.1MW PV plant in the Czech Republic....

  16. Weekly Petroleum Status Report

    Gasoline and Diesel Fuel Update (EIA)

    Please go to the redesigned Weekly Petroleum Status Report.

  17. Optical fiber having wave-guiding rings

    DOE Patents [OSTI]

    Messerly, Michael J.; Dawson, Jay W.; Beach, Raymond J.; Barty, Christopher P. J.

    2011-03-15

    A waveguide includes a cladding region that has a refractive index that is substantially uniform and surrounds a wave-guiding region that has an average index that is close to the index of the cladding. The wave-guiding region also contains a thin ring or series of rings that have an index or indices that differ significantly from the index of the cladding. The ring or rings enable the structure to guide light.

  18. Proposal Submittal and Scheduling Procedures for Macromolecular

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Crystallography | Stanford Synchrotron Radiation Lightsource Proposal Submittal and Scheduling Procedures for Macromolecular Crystallography Beam time for macromolecular crystallography projects is obtained by submitting an SSRL Macromolecular Crystallography Proposal. This proposal is peer reviewed by the Structural Molecular Biology and Biophysics subpanel of the SSRL Proposal Review Panel (PRP) for scientific merit and rating and for criticality of synchrotron radiation use. Proposal

  19. Transforming PV Installations Toward Dispatchable, Schedulable...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PV insTallaTions Toward disPaTchable, schedulable energy soluTions MIChAEl MIllS-PrICE, SEGIS-AC ProGrAM MAnAGEr, AE SolAr EnErGy A B C N SATCON518kw1 B2+2 Cap Bank ...

  20. Reflex ring laser amplifier system

    DOE Patents [OSTI]

    Summers, M.A.

    1983-08-31

    The invention is a method and apparatus for providing a reflex ring laser system for amplifying an input laser pulse. The invention is particularly useful in laser fusion experiments where efficient production of high-energy and high power laser pulses is required. The invention comprises a large aperture laser amplifier in an unstable ring resonator which includes a combination spatial filter and beam expander having a magnification greater than unity. An input pulse is injected into the resonator, e.g., through an aperture in an input mirror. The injected pulse passes through the amplifier and spatial filter/expander components on each pass around the ring. The unstable resonator is designed to permit only a predetermined number of passes before the amplified pulse exits the resonator. On the first pass through the amplifier, the beam fills only a small central region of the gain medium. On each successive pass, the beam has been expanded to fill the next concentric non-overlapping region of the gain medium.

  1. Tevatron status

    SciTech Connect (OSTI)

    Dugan, G.

    1989-03-01

    The Fermilab Tevatron is both the world's highest energy accelerator system and first large-scale superconducting synchrotron. Since Tevatron commissioning in July 1983, the accelerator has operated in 1984, 1985 and 1987 with extracted beams of 800 GeV for three runs of fixed target physics, and in 1987, and 1988, with proton-antiproton colliding beams at 900 /times/ 900 GeV. This paper will focus on the collider operation of the Tevatron: its present status and the outlook for its longer-term future evolution. 18 refs., 3 figs., 2 tabs.

  2. Optimal investment and scheduling of distributed energy resources with uncertainty in electric vehicles driving schedules

    SciTech Connect (OSTI)

    Cardoso, Goncalo; Stadler, Michael; Bozchalui, Mohammed C.; Sharma, Ratnesh; Marnay, Chris; Barbosa-Povoa, Ana; Ferrao, Paulo

    2013-12-06

    The large scale penetration of electric vehicles (EVs) will introduce technical challenges to the distribution grid, but also carries the potential for vehicle-to-grid services. Namely, if available in large enough numbers, EVs can be used as a distributed energy resource (DER) and their presence can influence optimal DER investment and scheduling decisions in microgrids. In this work, a novel EV fleet aggregator model is introduced in a stochastic formulation of DER-CAM [1], an optimization tool used to address DER investment and scheduling problems. This is used to assess the impact of EV interconnections on optimal DER solutions considering uncertainty in EV driving schedules. Optimization results indicate that EVs can have a significant impact on DER investments, particularly if considering short payback periods. Furthermore, results suggest that uncertainty in driving schedules carries little significance to total energy costs, which is corroborated by results obtained using the stochastic formulation of the problem.

  3. Wavelength-tunable optical ring resonators

    DOE Patents [OSTI]

    Watts, Michael R.; Trotter, Douglas C.; Young, Ralph W.; Nielson, Gregory N.

    2009-11-10

    Optical ring resonator devices are disclosed that can be used for optical filtering, modulation or switching, or for use as photodetectors or sensors. These devices can be formed as microdisk ring resonators, or as open-ring resonators with an optical waveguide having a width that varies adiabatically. Electrical and mechanical connections to the open-ring resonators are made near a maximum width of the optical waveguide to minimize losses and thereby provide a high resonator Q. The ring resonators can be tuned using an integral electrical heater, or an integral semiconductor junction.

  4. Wavelength-tunable optical ring resonators

    DOE Patents [OSTI]

    Watts, Michael R.; Trotter, Douglas C.; Young, Ralph W.; Nielson, Gregory N.

    2011-07-19

    Optical ring resonator devices are disclosed that can be used for optical filtering, modulation or switching, or for use as photodetectors or sensors. These devices can be formed as microdisk ring resonators, or as open-ring resonators with an optical waveguide having a width that varies adiabatically. Electrical and mechanical connections to the open-ring resonators are made near a maximum width of the optical waveguide to minimize losses and thereby provide a high resonator Q. The ring resonators can be tuned using an integral electrical heater, or an integral semiconductor junction.

  5. Experimental Run Schedules for Previous Years | Stanford Synchrotron...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Run Schedules for Previous Years SPEAR Operating Maintenance Beam Line Schedule Accelerator Physics FY2015 X-ray VUV, BL13 Macromolecular Crystallography FY2014 X-ray VUV, BL13...

  6. Exhibit D: Mirant Potomac River Schedule of Unit Operations:...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    January - March 2006 Exhibit D: Mirant Potomac River Schedule of Unit Operations: January - March 2006 Docket No. EO-05-01: Exhibit D: Mirant Potomac River Schedule of Unit ...

  7. Exhibit D: Mirant Potomac River Schedule of Unit Operations:...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Exhibit D: Mirant Potomac River Schedule of Unit Operations: Supplement 4, January - March 2006 Docket No. EO-05-01: Exhibit D: Mirant Potomac River Schedule of Unit Operations in ...

  8. To: Mansueti, Lawrence Subject: RE: Pepco Scheduled Line Repair...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    January 29, 2007 6:28 PM To: Mansueti, Lawrence Subject: RE: Pepco Scheduled Line Repair Dec. 1-20, 2006 Larry, Regarding the planned line outage, scheduled for Feb. 20 through Mar...

  9. Emailed Comments of Elizabeth Chimento RE: Pepco Scheduled Line...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Emailed Comments of Elizabeth Chimento RE: Pepco Scheduled Line Repair Dec. 1-20, 2006 Docket No. EO-05-01. Regarding the planned line outage, scheduled for Feb. 20 through Mar. 6, ...

  10. Utah Water Rights Fee Schedule | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Utah Water Rights Fee Schedule Abstract Water rights fee schedule based on amount appropriated....

  11. MISS-1-N Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    MISS-1-N Wholesale Power Rate Schedule MISS-1-N Wholesale Power Rate Schedule Area: South Mississippi Electric Power Association System: Georgia-Alabama-South Carolina This rate schedule shall be available to the South Mississippi Electric Power Association (hereinafter called the Customer) to whom power may be wheeled pursuant to contracts between the Government and PowerSouth Energy Cooperative (hereinafter called PowerSouth). This rate schedule shall be applicable to the sale at wholesale of

  12. Linux Kernel Co-Scheduling For Bulk Synchronous Parallel Applications

    Office of Scientific and Technical Information (OSTI)

    (Conference) | SciTech Connect Linux Kernel Co-Scheduling For Bulk Synchronous Parallel Applications Citation Details In-Document Search Title: Linux Kernel Co-Scheduling For Bulk Synchronous Parallel Applications This paper describes a kernel scheduling algorithm that is based on co-scheduling principles and that is intended for parallel applications running on 1000 cores or more where inter-node scalability is key. Experimental results for a Linux implementation on a Cray XT5 machine are

  13. Exhibit D: Mirant Potomac River Schedule of Unit Operations: January -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    March 2006 | Department of Energy January - March 2006 Exhibit D: Mirant Potomac River Schedule of Unit Operations: January - March 2006 Docket No. EO-05-01: Exhibit D: Mirant Potomac River Schedule of Unit Operations related to Supplement Number 4 of the Operating Plan of Mirant Potomac River, LLC PDF icon Exhibit D: Mirant Potomac River Schedule of Unit Operations More Documents & Publications Exhibit D: Mirant Potomac River Schedule of Unit Operations: Supplement 3, January and

  14. 2015 Procurement Evaluation and Re-engineering Team (PERT) Schedule |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 15 Procurement Evaluation and Re-engineering Team (PERT) Schedule 2015 Procurement Evaluation and Re-engineering Team (PERT) Schedule PDF icon PERT Schedule 2015.pdf More Documents & Publications Change to Procurement Evaluation & Re-Engineering Team (PERT) Review Cycle Procurement Evaluation & Re-Engineering Team (PERT) and Establishment of a 5-year Cycle with Corresponding Schedule POLICY FLASH 2015-40

  15. JW-1-J Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    JW-1-J Wholesale Power Rate Schedule JW-1-J Wholesale Power Rate Schedule Area: Woodruff Preference Customer System: Jim Woodruff This rate schedule shall be available to public bodies and cooperatives served by the Progress Energy Florida and having points of delivery within 150 miles of the Jim Woodruff Project (hereinafter called the Project). This rate schedule shall be applicable to firm power and accompanying energy made available by the Government from the Project and sold in wholesale

  16. VANC-1 Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    VANC-1 Wholesale Power Rate Schedule VANC-1 Wholesale Power Rate Schedule This rate schedule shall be available to public bodies and cooperatives or their agents (any one of whom is hereinafter called the Customer) in North Carolina and Virginia to whom transmission is provided from the PJM Interconnection LLC (hereinafter called PJM) or Carolina Power & Light Company (hereinafter called CP&L). This rate schedule shall be applicable to transmission services provided and sold under

  17. Santee-2-E Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    2-E Wholesale Power Rate Schedule Santee-2-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter call the Customer) in South Carolina to whom power may be wheeled pursuant to contracts between the Government and South Carolina Public Service Authority (hereinafter called the Authority). This rate schedule shall be applicable to the sale at wholesale of power and

  18. Santee-4-E Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    4-E Wholesale Power Rate Schedule Santee-4-E Wholesale Power Rate Schedule Area: Santee-Cooper System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter call the Customer) in South Carolina served through the transmission facilities of South Carolina Public Service Authority (hereinafter called the Authority). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy

  19. DOE HQ Shuttle Bus Schedule and Route | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Shuttle Bus Schedule and Route DOE HQ Shuttle Bus Schedule and Route The DOE Shuttle Buses follow the same schedules between the two main Headquarters locations, Forrestal and Germantown. The buses start their routes at each Headquarters facility at the same times, see the schedule below. The subsequent stops at the other facilities are relative to the departure time of each route. The shuttle bus departure and arrival times may be impacted by traffic, weather, or other logistical interruptions.

  20. ALA-1-N Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ALA-1-N Wholesale Power Rate Schedule ALA-1-N Wholesale Power Rate Schedule Area: PowerSouth Energy Cooperative System: Georgia-Alabama-South Carolina This rate schedule shall be available to the PowerSouth Energy Cooperative. This rate schedule shall be applicable to power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters, and Richard B. Russell Projects and sold under contract between

  1. Replacement-1 Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    Replacement-1 Wholesale Power Rate Schedule Replacement-1 Wholesale Power Rate Schedule Area: Replacement Energy System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, Florida, South Carolina, or North Carolina to whom power is provided pursuant to contracts between the Government and the Customer. This rate schedule shall be applicable to the sale at

  2. SOCO-4-E Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    4-E Wholesale Power Rate Schedule SOCO-4-E Wholesale Power Rate Schedule Area: OPC System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, and Florida served through the transmission facilities of Southern Company Services, Inc. (hereinafter called the Company) or the Georgia Integrated Transmission System. This rate schedule shall be applicable to the

  3. ADMINISTRATIVE RECORDS SCHEDULE 2: PAYROLL AND PAY ADMINISTRATION RECORDS |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy : PAYROLL AND PAY ADMINISTRATION RECORDS ADMINISTRATIVE RECORDS SCHEDULE 2: PAYROLL AND PAY ADMINISTRATION RECORDS Payrolling and pay administration records pertain to the disbursements employees receive in return for their personal services. This schedule covers commonly used pay records PDF icon ADMINISTRATIVE RECORDS SCHEDULE 2: PAYROLL AND PAY ADMINISTRATION RECORDS More Documents & Publications ADMINISTRATIVE RECORDS SCHEDULE 2: PAYROLL AND PAY ADMINISTRATION

  4. Advanced Technology System Scheduling Governance Model

    SciTech Connect (OSTI)

    Ang, Jim; Carnes, Brian; Hoang, Thuc; Vigil, Manuel

    2015-06-11

    In the fall of 2005, the Advanced Simulation and Computing (ASC) Program appointed a team to formulate a governance model for allocating resources and scheduling the stockpile stewardship workload on ASC capability systems. This update to the original document takes into account the new technical challenges and roles for advanced technology (AT) systems and the new ASC Program workload categories that must be supported. The goal of this updated model is to effectively allocate and schedule AT computing resources among all three National Nuclear Security Administration (NNSA) laboratories for weapons deliverables that merit priority on this class of resource. The process outlined below describes how proposed work can be evaluated and approved for resource allocations while preserving high effective utilization of the systems. This approach will provide the broadest possible benefit to the Stockpile Stewardship Program (SSP).

  5. Ring magnet firing angle control

    DOE Patents [OSTI]

    Knott, M.J.; Lewis, L.G.; Rabe, H.H.

    1975-10-21

    A device is provided for controlling the firing angles of thyratrons (rectifiers) in a ring magnet power supply. A phase lock loop develops a smooth ac signal of frequency equal to and in phase with the frequency of the voltage wave developed by the main generator of the power supply. A counter that counts from zero to a particular number each cycle of the main generator voltage wave is synchronized with the smooth AC signal of the phase lock loop. Gates compare the number in the counter with predetermined desired firing angles for each thyratron and with coincidence the proper thyratron is fired at the predetermined firing angle.

  6. the-schedule-based-transit-model

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The Schedule-Based transit model of the Chicago Metropolitan Area Vadim Sokolov Transportation Research and Analysis Computing Center Argonne National Laboratory List of Authors ================ Vadim Sokolov Transportation Research and Analysis Computing Center Argonne National Laboratory 277 International Drive West Chicago, IL 60185 Abstract ========= Usually public transit systems are modeled using so called frequency based approach. In this case transit route times are defined in terms of

  7. Work Schedules | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Work Schedules The great jobs we have at NNSA also come with comprehensive benefits packages. They are among the best and most comprehensive available and play a vital role in demonstrating the Federal government and NNSA's commitment to its employees. The great jobs we have at NNSA also come with comprehensive benefits packages. They are among the best and most comprehensive available and play a vital role in demonstrating the Federal government and NNSA's commitment to its employees. Work

  8. Cooling system for three hook ring segment

    DOE Patents [OSTI]

    Campbell, Christian X.; Eng, Darryl; Lee, Ching-Pang; Patat, Harry

    2014-08-26

    A triple hook ring segment including forward, midsection and aft mounting hooks for engagement with respective hangers formed on a ring segment carrier for supporting a ring segment panel, and defining a forward high pressure chamber and an aft low pressure chamber on opposing sides of the midsection mounting hook. An isolation plate is provided on the aft side of the midsection mounting hook to form an isolation chamber between the aft low pressure chamber and the ring segment panel. High pressure air is supplied to the forward chamber and flows to the isolation chamber through crossover passages in the midsection hook. The isolation chamber provides convection cooling air to an aft portion of the ring segment panel and enables a reduction of air pressure in the aft low pressure chamber to reduce leakage flow of cooling air from the ring segment.

  9. TRU Waste Management Program. Cost/schedule optimization analysis

    SciTech Connect (OSTI)

    Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.; Hastings, G.A.

    1985-10-01

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.

  10. Interferometric ring lasers and optical devices

    DOE Patents [OSTI]

    Hohimer, J.P.; Craft, D.C.

    1995-03-14

    Two ring diode lasers are optically coupled together to produce tunable, stable output through a Y-junction output coupler which may also be a laser diode or can be an active waveguide. These devices demonstrate a sharp peak in light output with an excellent side-mode-rejection ratio. The rings can also be made of passive or active waveguide material. With additional rings the device is a tunable optical multiplexer/demultiplexer. 11 figs.

  11. Report of the eRHIC Ring-Ring Working Group

    SciTech Connect (OSTI)

    Aschenauer, E. C.; Berg, S.; Blaskiewicz, M.; Brennan, M.; Fedotov, A.; Fischer, W.; Litvinenko, V.; Montag, C.; Palmer, R.; Parker, B.; Peggs, S.; Ptitsyn, V.; Ranjbar, V.; Tepikian, S.; Trbojevic, D.; Willeke, F.

    2015-10-13

    This report evaluates the ring-ring option for eRHIC as a lower risk alternative to the linac-ring option. The reduced risk goes along with a reduced initial luminosity performance. However, a luminosity upgrade path is kept open. This upgrade path consists of two branches, with the ultimate upgrade being either a ring-ring or a linac-ring scheme. The linac-ring upgrade could be almost identical to the proposed linac-ring scheme, which is based on an ERL in the RHIC tunnel. This linac-ring version has been studied in great detail over the past ten years, and its significant risks are known. On the other hand, no detailed work on an ultimate performance ring-ring scenario has been performed yet, other than the development of a consistent parameter set. Pursuing the ring-ring upgrade path introduces high risks and requires significant design work that is beyond the scope of this report.

  12. Condenser for illuminating a ring field

    DOE Patents [OSTI]

    Sweatt, W.C.

    1994-11-01

    A series of segments of a parent aspheric mirror having one foci at a point source of radiation and the other foci at the radius of a ring field have all but one or all of their beams translated and rotated by sets of mirrors such that all of the beams pass through the real entrance pupil of a ring field camera about one of the beams and fall onto the ring field radius as a coincident image as an arc of the ring field. 5 figs.

  13. Concrete Pour in NSLS-II Ring

    ScienceCinema (OSTI)

    Bruno Semon

    2013-07-22

    The mezzanine floor of the ring building tunnel for NSLS-II was completed when the last concrete was placed in February 2011.

  14. NIF Status Update - 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    status NIF Status Update - 2014 May - Highlights of May Experiments on NIF Gigabar Equation-of-State Experiments Production of Beryllium Capsules for NIF Begins First Weekly...

  15. Concentric ring flywheel with hooked ring carbon fiber separator/torque coupler

    DOE Patents [OSTI]

    Kuklo, Thomas C. (Oakdale, CA)

    1999-01-01

    A concentric ring flywheel with expandable separators, which function as torque couplers, between the rings to take up the gap formed between adjacent rings due to differential expansion between different radius rings during rotation of the flywheel. The expandable separators or torque couplers include a hook-like section at an upper end which is positioned over an inner ring and a shelf-like or flange section at a lower end onto which the next adjacent outer ring is positioned. As the concentric rings are rotated the gap formed by the differential expansion there between is partially taken up by the expandable separators or torque couplers to maintain torque and centering attachment of the concentric rings.

  16. Concentric ring flywheel with hooked ring carbon fiber separator/torque coupler

    DOE Patents [OSTI]

    Kuklo, T.C.

    1999-07-20

    A concentric ring flywheel with expandable separators, which function as torque couplers, between the rings to take up the gap formed between adjacent rings due to differential expansion between different radius rings during rotation of the flywheel. The expandable separators or torque couplers include a hook-like section at an upper end which is positioned over an inner ring and a shelf-like or flange section at a lower end onto which the next adjacent outer ring is positioned. As the concentric rings are rotated the gap formed by the differential expansion there between is partially taken up by the expandable separators or torque couplers to maintain torque and centering attachment of the concentric rings. 2 figs.

  17. Mechanical support of a ceramic gas turbine vane ring

    DOE Patents [OSTI]

    Shi, Jun; Green, Kevin E.; Mosher, Daniel A.; Holowczak, John E.; Reinhardt, Gregory E.

    2010-07-27

    An assembly for mounting a ceramic turbine vane ring onto a turbine support casing comprises a first metal clamping ring and a second metal clamping ring. The first metal clamping ring is configured to engage with a first side of a tab member of the ceramic turbine vane ring. The second metal clamping ring is configured to engage with a second side of the tab member such that the tab member is disposed between the first and second metal clamping rings.

  18. Middle School Schedule | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Schedule Saturday, February 20, 2016 (Iowa State University campus, Ames, Iowa) 7:30 - Registration and continental breakfast (Room 1002 Gilman Hall) 8:00 - Welcome & Announcements (Room 1002 Gilman Hall) 8:30 - Practice Rounds (TASF, Gilman, Spedding and Hach Halls) 9:30 - Round Robin (TASF, Gilman, Spedding and Hach Halls) 11:00 - Tie Breaker (if needed) 11:20 - LUNCH (Union Drive Dining Center - free for coaches, teams and volunteers) 12:30 - Double Elimination (top 12 teams determined by

  19. Botas line repaired ahead of schedule

    SciTech Connect (OSTI)

    Not Available

    1991-11-01

    This paper reports on damaged sections of Botas' dual 30-in. gas line carrying USSR gas across the Marmara Sea to Turkey that were replaced 30 days ahead of contract schedule. Tefken Construction and Installation Co., Inc., Istanbul, working under a $4-million contract, replaced two sections on one of the dual lines near Ambarli, Turkey, within a two-month period. The offshore system stretches 33-mi under the Marmara Sea with some pipe laid at 262-ft maximum water depths. The scope of the project was to replace a 426-ft offshore approach to the northern shoreline and a 984-ft onshore section, which were damaged by a submarine landslide.

  20. HANFORD ADVISORY BOARD DRAFT 2013 MEETING SCHEDULE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2013 MEETING SCHEDULE Updated December 10, 2012 MEETING DATE LOCATION PHONE NUMBER # GUEST ROOMS RESERVED SHUTTLE SERVICE February 7-8, 2013 Red Lion Hanford House 802 George Washington Way Richland, Washington Phone: 509-946-7611 1-800-733-5466 Fax: (509) 943-8564 15 Rooms @ $93 For Feb 6 & 7 Reserve by Jan 6 YES April 4-5, 2013 Red Lion Columbia Center 1101 N. Columbia Center Blvd Kennewick, WA Phone: 509-783-0611 1-800-733-5466 15 Rooms @ $93 For Apr 3 & 4 Reserve by Mar 3 YES June

  1. PMIX_Ring patch for SLURM

    Energy Science and Technology Software Center (OSTI)

    2014-04-20

    This code adds an implementation of PMIX_Ring to the existing PM12 Library in the SLURM open source software package (Simple Linux Utility for Resource Management). PMIX_Ring executes a particular communication pattern that is used to bootstrap connections between MPI processes in a parallel job.

  2. Bernstein instability driven by thermal ring distribution

    SciTech Connect (OSTI)

    Yoon, Peter H.; Hadi, Fazal; Qamar, Anisa

    2014-07-15

    The classic Bernstein waves may be intimately related to banded emissions detected in laboratory plasmas, terrestrial, and other planetary magnetospheres. However, the customary discussion of the Bernstein wave is based upon isotropic thermal velocity distribution function. In order to understand how such waves can be excited, one needs an emission mechanism, i.e., an instability. In non-relativistic collision-less plasmas, the only known Bernstein wave instability is that associated with a cold perpendicular velocity ring distribution function. However, cold ring distribution is highly idealized. The present Brief Communication generalizes the cold ring distribution model to include thermal spread, so that the Bernstein-ring instability is described by a more realistic electron distribution function, with which the stabilization by thermal spread associated with the ring distribution is demonstrated. The present findings imply that the excitation of Bernstein waves requires a sufficiently high perpendicular velocity gradient associated with the electron distribution function.

  3. eRHIC ring-ring design with head-on beam-beam compensation

    SciTech Connect (OSTI)

    Montag,C.; Blaskiewicz, M.; Pozdeyev, E.; Fischer, W.; MacKay, W. W.

    2009-05-04

    The luminosity of the eRHIC ring-ring design is limited by the beam-beam effect exerted on the electron beam. Recent simulation studies have shown that the beam-beam limit can be increased by means of an electron lens that compensates the beam-beam effect experienced by the electron beam. This scheme requires proper design of the electron ring, providing the correct betatron phase advance between interaction point and electron lens. We review the performance of the eRHIC ring-ring version and discuss various parameter sets, based on different cooling schemes for the proton/ion beam.

  4. Microsoft Word - 2016schedule.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    User Meeting, 2016 April 29, 2016 10:00 am - 12:20 pm; Morning Session Registration near CAMD Conference Room, 2 nd office building 10:00 - 11:20 Experiment Hall; Visit Multipole Wiggler Beamlines as well as newly installed or rebuilt beamlines SAXS, 5-m TGM and LEXAS; CAMD Beamline Scientists will be available to discuss capabilities of these installations. Accelerator staff will be available to give tour of Storage Ring and Multipole Wiggler from Bridge (access, 2 nd floor). 10:30 - 11:20

  5. Structure of a BRCA1/BARD1 Complex: a Heterodimeric RING-RING Interaction

    SciTech Connect (OSTI)

    Brzovic, Peter S.; Rajagopal, Ponni; Hoyt, David W.; King, Mary-Claire; Klevit, Rachel E.

    2001-10-01

    The N-terminal RING domain of the breast and ovarian cancer tumor suppressor BRCA1 interacts with multiple cognate proteins, including the RING protein, BARD1. Proper function of the BRCA1 RING domain is critical, as evidenced by the many cancer-predisposing mutations found within this domain. We present the solution structure of the N-terminal RING domain heterodimer of BRCA1 and BARD1. Comparison with the RAG1 RING homodimer reveals the structural diversity of complexes formed by interactions between different RING domains. The BRCA1/BARD1 structure provides a model for its ubiquitin ligase activity, illustrates how the BRCA1 RING domain can be involved in associations with multiple protein partners, and provdes a framework for understanding cancer-causing mutations at the molecular level.

  6. Wedding ring shaped excitation coil

    DOE Patents [OSTI]

    MacLennan, Donald A.; Tsai, Peter

    2001-01-01

    A high frequency inductively coupled electrodeless lamp includes an excitation coil with an effective electrical length which is less than one half wavelength of a driving frequency applied thereto, preferably much less. The driving frequency may be greater than 100 MHz and is preferably as high as 915 MHz. Preferably, the excitation coil is configured as a non-helical, semi-cylindrical conductive surface having less than one turn, in the general shape of a wedding ring. At high frequencies, the current in the coil forms two loops which are spaced apart and parallel to each other. Configured appropriately, the coil approximates a Helmholtz configuration. The lamp preferably utilizes an bulb encased in a reflective ceramic cup with a pre-formed aperture defined therethrough. The ceramic cup may include structural features to aid in alignment and/or a flanged face to aid in thermal management. The lamp head is preferably an integrated lamp head comprising a metal matrix composite surrounding an insulating ceramic with the excitation integrally formed on the ceramic. A novel solid-state oscillator preferably provides RF power to the lamp. The oscillator is a single active element device capable of providing over 70 watts of power at over 70% efficiency.

  7. Proposal Submittal and Scheduling Procedures for Research | Stanford

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Synchrotron Radiation Lightsource Proposal Submittal and Scheduling Procedures for Research New Proposals Standard GU Proposals Instructions for New Standard Proposals (Not LOI or Rapid Access) Tips for How to Wow Rapid Access Letter of Intent (LOI) Proposal Extension Requests X-ray/VUV Macromolecular Crystallography Beam Time Allocation/Scheduling How to Request Beam Time SSRL Access Policy SSRL Schedules Publications & Reports New Proposals SSRL operates as a dedicated synchrotron

  8. Linux Kernel Co-Scheduling and Bulk Synchronous Parallelism (Journal

    Office of Scientific and Technical Information (OSTI)

    Article) | SciTech Connect Linux Kernel Co-Scheduling and Bulk Synchronous Parallelism Citation Details In-Document Search Title: Linux Kernel Co-Scheduling and Bulk Synchronous Parallelism This paper describes a kernel scheduling algorithm that is based on coscheduling principles and that is intended for parallel applications running on 1000 cores or more. Experimental results for a Linux implementation on a Cray XT5 machine are presented. The results indicate that Linux is a suitable

  9. DOE HQ Shuttle Bus Route and Schedule, April 2016

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    April, 2016 DOE HQ Shuttle Bus Route and Schedule The DOE Shuttle Buses follow the same schedules between the two main Headquarters locations, Forrestal and Germantown. The buses start their routes at each Headquarters facility at the same times, see the schedule below. The subsequent stops at the other facilities are relative to the departure time of each route. Headquarters employees are reminded of the statutory provisions that authorize and limit the use of the shuttle bus service. Specific

  10. ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (Revision 2) | Department of Energy 3: RECORDS COMMON TO MOST OFFICES (Revision 2) ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES (Revision 2) This schedule provides for the disposal of certain records common to most offices. It covers administrative subject files; facilitative records such as suspense files, tracking and control records, calendars, and indexes; and documents of transitory value. PDF icon ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES

  11. ADMINISTRATIVE RECORDS SCHEDULE 4: PROPERTY DISPOSAL RECORDS (Revision 2) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 4: PROPERTY DISPOSAL RECORDS (Revision 2) ADMINISTRATIVE RECORDS SCHEDULE 4: PROPERTY DISPOSAL RECORDS (Revision 2) These records pertain to the sales by agencies of real and personal property surplus to the needs of the Government. PDF icon ADMINISTRATIVE RECORDS SCHEDULE 4: PROPERTY DISPOSAL RECORDS (Revision 2) More Documents & Publications PROPERTY DISPOSAL RECORDS ADMINISTRATIVE RECORDS: PROCUREMENT, SUPPLY, AND GRANT RECORDS ADMINISTRATIVE RECORDS SCHEDULE 3:

  12. SOCO-2-E Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    2-E Wholesale Power Rate Schedule SOCO-2-E Wholesale Power Rate Schedule Area: PowerSouth Off-System System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, and Florida to whom power may be transmitted pursuant to contracts between the Government and Southern Company Services, Incorporated (hereinafter called the Company) and the Customer. This rate

  13. Potomac River Project Outage Schedule Clarification | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    River Project Outage Schedule Clarification Potomac River Project Outage Schedule Clarification Docket No. EO-05-01. Order No. 202-07-02: Based on the most current information we have for both circuits, the new outage dates are listed below: Outage Duration Feeder Out April 30, 2007 - June 1, 2007 Circuit 1 June 2, 2007 - July 1, 2007 Circuit 2 PDF icon Potomac River Project Outage Schedule Clarification More Documents & Publications Re: Potomac River Generating Station Department of Energy,

  14. ADMINISTRATIVE RECORDS SCHEDULE 2: PAYROLL AND PAY ADMINISTRATION RECORDS (SUPERSEDED)

    Broader source: Energy.gov [DOE]

    Payrolling and pay administration records pertain to the disbursements employees receivein return for their personal services.  This schedule covers commonly used pay records.

  15. Y-12 Finishes Initial HEUMF Loading Ahead of Schedule | National...

    National Nuclear Security Administration (NNSA)

    Blog Home Field Offices Welcome to the NNSA Production Office NPO News Releases Y-12 Finishes Initial HEUMF Loading Ahead of Schedule Y-12 Finishes Initial HEUMF Loading...

  16. LCLS Experimental Run Schedules | Linac Coherent Light Source

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LCLS Experimental Run Schedules Check-In | Computer Accounts | Data Collection & Analysis | Policies | Proposals | Shipping | User Portal LCLS generally operates November through...

  17. Reserving and Scheduling Transmission over the Time Change -...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Customer Training Interconnection Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: Reserving & Scheduling Transmission over the Time Change Posted Date: 10...

  18. Reminder Reserving and Scheduling Transmission over the Time...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Customer Training Interconnection Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: Reminder - Reserving & Scheduling Transmission over the Time Change...

  19. Reserving and Scheduling Transmission over the Time Change -...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Customer Training Interconnection Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: Reserving & Scheduling Transmission over the Time Change Reminder Posted...

  20. Reserving and Scheduling Transmission over the Time Change -...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Customer Training Interconnection Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: Reserving & Scheduling Transmission over the Time Change Posted Date: 2...

  1. ADMINISTRATIVE RECORDS SCHEDULE 3: PROCUREMENT, SUPPLY, AND GRANT...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: PROCUREMENT, SUPPLY, AND GRANT RECORDS ADMINISTRATIVE RECORDS SCHEDULE 3: PROCUREMENT, SUPPLY, AND GRANT RECORDS The basic procurement files reflect a considerable range of ...

  2. ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This schedule provides for the disposal of certain records common to most offices. It covers administrative subject files; facilitative records such as suspense files, tracking and ...

  3. Maximizing productivity & profitability through best cost shift schedules

    SciTech Connect (OSTI)

    Coleman, R.

    1996-12-31

    If you have the right equipment and employees at the right place, the fight time, and the right cost, you have the perfect business schedule. But, if you`re like most mines, you can probably improve your schedule, improvements that will reach all the way to the bottom line. And unlike adding employees, materials, or capital equipment, better scheduling is a cost-free way improve profitability. A good schedule can save millions. A bad schedule will cost money every year. A shift schedule is not a day off pattern or shift length. A shift schedule is a complete system deploying personnel and capital equipment. Most mining schedules are either copied from another operation, based on tradition or the result of a contract negotiation made far from the mine site. Unfortunately, most mine managers don`t give much thought to schedules until a crisis develops; at which point the tendency is to implement the first solution that comes along as quickly as possible. Costly mistakes are made.

  4. Exhibit D: Mirant Potomac River Schedule of Operations: January...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Operations: January and February 2006 Exhibit D: Mirant Potomac River Schedule of Operations: January and February 2006 Docket No. EO-05-01. Exhibit D: Mirant Potomac River ...

  5. ADMINISTRATIVE RECORDS SCHEDULE 2: PAYROLL AND PAY ADMINISTRATION...

    Office of Environmental Management (EM)

    records pertain to the disbursements employees receivein return for their personal services. This schedule covers commonly used pay records. PDF icon Administrative...

  6. ADMINISTRATIVE RECORDS SCHEDULE 2: PAYROLL AND PAY ADMINISTRATION...

    Office of Environmental Management (EM)

    records pertain to the disbursements employees receive in return for their personal services. This schedule covers commonly used pay records PDF icon ADMINISTRATIVE...

  7. Domestic Hot Water Event Schedule Generator - Energy Innovation...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Efficiency Building Energy Efficiency Find More Like This Return to Search Domestic Hot Water Event Schedule Generator National Renewable Energy Laboratory Contact NREL About This...

  8. Research Forum Schedule-Research-PHaSe-EFRC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Research Forum Schedule PHaSE Research Fora and Talks This webpage is provided for legacy archive purposes only, as of 30 April 2015.

  9. EVMS Training Snippet: 3.3 Schedule Guidance and Resources

    Broader source: Energy.gov [DOE]

    This EVMS Training Snippet, sponsored by the Office of Project Management (PM) provides information on where to find more information about Scheduling.

  10. Appliance Standards Program Schedule - CCE Overview and Update...

    Broader source: Energy.gov (indexed) [DOE]

    Program Schedule & CCE Overview and Update presentation, dated 10262011, presented to Energy-Efficiency Advocacy Groups doeeeagpresent2011.pdf More Documents & Publications...

  11. Descriptions of ESPC Task Order Schedules and Placement of Pricing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pricing Information (IDIQ Attachment J-5) Descriptions of ESPC Task Order Schedules and Placement of Pricing Information (IDIQ Attachment J-5) Document provides task order ...

  12. FFTF & Advance Reactors Transition Program Resource Loaded Schedule

    SciTech Connect (OSTI)

    WITHERSPOON, W.V.

    2001-10-25

    This document is the annual update of the FFTF and Advanced Reactors Transition Program Resource Loaded Schedule for FY 2002 using current project direction and authorized funding levels

  13. Optimal Scheduling of In-situ Analysis Workflows and Independent...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Optimal Scheduling of In-situ Analysis Workflows and Independent Parallel IO Streams for Large-scale Scientific Simulations Event Sponsor: Argonne Leadership Computing Facility...

  14. Appliance Standards Program Schedule - CCE Overview and Update...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    13, 2011 Appliance Standards Program Schedule - CCE Overview and Update, dated October 26, 2011 NEMA Distribution Transformers, CCE Overview and Update presentation, dated 0524

  15. Pantex Plant Achieves Key Safety Milestone Ahead of Schedule...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Achieves Key Safety Milestone Ahead of Schedule | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing...

  16. Duke-3-E Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, ...

  17. Duke-4-E Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, ...

  18. Duke-2-E Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, ...

  19. United States Forest Service - Forest Service Schedule of Proposed...

    Open Energy Info (EERE)

    Actions Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: United States Forest Service - Forest Service Schedule of Proposed Actions Abstract The...

  20. Beamline 29-ID

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    & Milestones IEX Advisory Committees FDR Beamline Information RSXS ARPES APS Ring Status Current APS Schedule Intermediate Energy X-Rays (29-ID): The Intermediate Energy...

  1. Jessica McChesney

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Sector 6 Orientation Publications (4-ID) Publications (6-ID) Contact Us APS Ring Status Current APS Schedule Jessica McChesney Argonne National Laboratory 9700 S. Cass Ave...

  2. Wind turbine ring/shroud drive system

    DOE Patents [OSTI]

    Blakemore, Ralph W.

    2005-10-04

    A wind turbine capable of driving multiple electric generators having a ring or shroud structure for reducing blade root bending moments, hub loads, blade fastener loads and pitch bearing loads. The shroud may further incorporate a ring gear for driving an electric generator. In one embodiment, the electric generator may be cantilevered from the nacelle such that the gear on the generator drive shaft is contacted by the ring gear of the shroud. The shroud also provides protection for the gearing and aids in preventing gear lubricant contamination.

  3. COLLIMATION OPTIMIZATION IN HIGH INTENSITY RINGS.

    SciTech Connect (OSTI)

    CATALAN-LASHERAS,N.

    2001-06-18

    In high intensity proton rings, collimation is needed in order to maintain reasonable levels of residual activation and allow hands-on maintenance. Small acceptance to emittance ratio and restrained longitudinal space become important restrictions when dealing with low energy rings. The constraints and specifications when designing a collimation system for this type of machine will be reviewed. The SNS accumulator ring will serve as an examples long which we will illustrate the optimization path. Experimental studies of collimation with 1.3 GeV proton beams are currently under way in the U-70 machine in Protvino. The first results will be presented.

  4. Adjustable expandable cryogenic piston and ring

    DOE Patents [OSTI]

    Mazur, Peter O.; Pallaver, Carl B.

    1980-01-01

    The operation of a reciprocating expansion engine for cryogenic refrigeration is improved by changing the pistons and rings so that the piston can be operated from outside the engine to vary the groove in which the piston ring is located. This causes the ring, which is of a flexible material, to be squeezed so that its contact with the wall is subject to external control. This control may be made manually or it may be made automatically in response to instruments that sense the amount of blow-by of the cryogenic fluid and adjust for an optimum blow-by.

  5. Wavelength-tunable optical ring resonators (Patent) | DOEPatents

    Office of Scientific and Technical Information (OSTI)

    Wavelength-tunable optical ring resonators Title: Wavelength-tunable optical ring resonators Optical ring resonator devices are disclosed that can be used for optical filtering, modulation or switching, or for use as photodetectors or sensors. These devices can be formed as microdisk ring resonators, or as open-ring resonators with an optical waveguide having a width that varies adiabatically. Electrical and mechanical connections to the open-ring resonators are made near a maximum width of the

  6. Online optimization of storage ring nonlinear beam dynamics ...

    Office of Scientific and Technical Information (OSTI)

    Online optimization of storage ring nonlinear beam dynamics Citation Details In-Document Search Title: Online optimization of storage ring nonlinear beam dynamics Authors: Huang,...

  7. An ultimate storage ring lattice with vertical emittance generated...

    Office of Scientific and Technical Information (OSTI)

    Journal Article: An ultimate storage ring lattice with vertical emittance generated by damping wigglers Citation Details In-Document Search Title: An ultimate storage ring lattice...

  8. Online optimization of storage ring nonlinear beam dynamics ...

    Office of Scientific and Technical Information (OSTI)

    Online optimization of storage ring nonlinear beam dynamics Citation Details In-Document Search Title: Online optimization of storage ring nonlinear beam dynamics You are...

  9. Single-Particle Dynamics in Electron Storage Rings with Extremely...

    Office of Scientific and Technical Information (OSTI)

    with Extremely Low Emittance Electron storage rings are widely used for high luminosity colliders, damping rings in high-energy linear colliders, and synchrotron light sources. ...

  10. Updates to the International Linear Collider Damping Rings Baseline...

    Office of Scientific and Technical Information (OSTI)

    Updates to the International Linear Collider Damping Rings Baseline Design Citation Details In-Document Search Title: Updates to the International Linear Collider Damping Rings...

  11. From Protein Structure to Function: Ring Cycle for Dilating and...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    From Protein Structure to Function: Ring Cycle for Dilating and Constricting the Nuclear Pore From Protein Structure to Function: Ring Cycle for Dilating and Constricting the...

  12. Corrective Action Unit Deliverable/Task Status Tracking Tool

    Energy Science and Technology Software Center (OSTI)

    2009-08-13

    The CDSTool is a project management tool designed specifically to manage environmental restoration projects. The tool allows users to capture all projects in their baseline, develop and assign approaches, assign documents and reviews to particular projects and approaches, track and measure progress and status of each document/phase/activity in the project, based on the approach. The CDSTtool provides the ability to assign responsible personnel to each activity, provide status to scheduling software, track WBS, capture issues,more » comments, and history of development or performance related to the activity, document or phase.« less

  13. Low thermal expansion seal ring support

    DOE Patents [OSTI]

    Dewis, David W.; Glezer, Boris

    2000-01-01

    Today, the trend is to increase the temperature of operation of gas turbine engines. To cool the components with compressor discharge air, robs air which could otherwise be used for combustion and creates a less efficient gas turbine engine. The present low thermal expansion sealing ring support system reduces the quantity of cooling air required while maintaining life and longevity of the components. Additionally, the low thermal expansion sealing ring reduces the clearance "C","C'" demanded between the interface between the sealing surface and the tip of the plurality of turbine blades. The sealing ring is supported by a plurality of support members in a manner in which the sealing ring and the plurality of support members independently expand and contract relative to each other and to other gas turbine engine components.

  14. Proton storage ring: man/machine interface

    SciTech Connect (OSTI)

    Lander, R.F.; Clout, P.N.

    1985-01-01

    The human interface of the Proton Storage Ring Control System at Los Alamos is described in some detail, together with the software environment in which operator interaction programs are written. Some examples of operator interaction programs are given.

  15. RingCentral Mailboxes | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office spreadsheet icon RingCentral Mailboxes Responsible Contacts Bruce Murray HR Policy Advisor E-mail bruce.murray@hq.doe.gov Phone 202-586-3372 More Documents & Publications ...

  16. ADMINISTRATIVE RECORDS SCHEDULE 3: PROCUREMENT, SUPPLY, AND GRANT RECORDS |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 3: PROCUREMENT, SUPPLY, AND GRANT RECORDS ADMINISTRATIVE RECORDS SCHEDULE 3: PROCUREMENT, SUPPLY, AND GRANT RECORDS The basic procurement files reflect a considerable range of procedure, from simple, small purchases to complicated prime contractor and subcontractor operation. PDF icon ADMINISTRATIVE RECORDS SCHEDULE 3: PROCUREMENT, SUPPLY, AND GRANT RECORDS More Documents & Publications ADMINISTRATIVE RECORDS: PROCUREMENT, SUPPLY, AND GRANT RECORDS ADMINISTRATIVE

  17. LANL'S DEVELOPMENT OF SCHEDULE CONTINGENCY BASED ON PROBABILISTIC RISK RESULTS

    SciTech Connect (OSTI)

    F. K. HOUGHTON; J. P. KINDINGER; ET AL

    2001-03-01

    The need for budget reserve in project planning is widely recognized, but the need for a corresponding schedule reserve is generally not as universally acknowledged. Los Alamos National Laboratory (LANL) performs probabilistic project risk analyses for all major projects; the question has become how to more fully use the results of the schedule analyses to establish a schedule reserve. Before the use of quantitative project risk analysis, milestones were based on the initial point estimate with float time as the only time reserved for delays. With this practice, the set of tasks that have duration reserve is limited. In particular, critical path tasks, which do not have associated float, do not have reserve schedule time to use for delays. For other tasks, float was used on a ''first-come, first-served'' basis without allocation to other tasks. Thus, it was not possible to systematically allocate schedule reserve to project tasks.

  18. Balancing Authority Cooperation Concepts - Intra-Hour Scheduling

    SciTech Connect (OSTI)

    Hunsaker, Matthew; Samaan, Nader; Milligan, Michael; Guo, Tao; Liu, Guangjuan; Toolson, Jacob

    2013-03-29

    The overall objective of this study was to understand, on an Interconnection-wide basis, the effects intra-hour scheduling compared to hourly scheduling. Moreover, the study sought to understand how the benefits of intra-hour scheduling would change by altering the input assumptions in different scenarios. This report describes results of three separate scenarios with differing key assumptions and comparing the production costs between hourly scheduling and 10-minute scheduling performance. The different scenarios were chosen to provide insight into how the estimated benefits might change by altering input assumptions. Several key assumptions were different in the three scenarios, however most assumptions were similar and/or unchanged among the scenarios.

  19. Updates and Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Status Updates and Status Current Status: Up Carver Email Announcements Archive An archive of email announcements sent to NERSC users regarding Carver. Read More » Timeline Timeline of significant Carver events. Read More » Last edited: 2016-04-29 11:34:35

  20. Updates and Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Status Updates and Status Current Status: Up Announcements All recent NERSC announcements affecting Euclid. Read More » Email Announcements Archive An archive of email announcements sent to NERSC users regarding Euclid. Read More » Known Problems All known current problems with Euclid. Read More » Timeline Timeline of significant Euclid events. Read More » Last edited: 2016-04-29 11:34:40

  1. Heuristic status polling

    DOE Patents [OSTI]

    Archer, Charles J.; Blocksome, Michael A.; Heidelberger, Philip; Kumar, Sameer; Parker, Jeffrey J.; Ratterman, Joseph D.

    2011-06-07

    Methods, compute nodes, and computer program products are provided for heuristic status polling of a component in a computing system. Embodiments include receiving, by a polling module from a requesting application, a status request requesting status of a component; determining, by the polling module, whether an activity history for the component satisfies heuristic polling criteria; polling, by the polling module, the component for status if the activity history for the component satisfies the heuristic polling criteria; and not polling, by the polling module, the component for status if the activity history for the component does not satisfy the heuristic criteria.

  2. Gasket and snap ring installation tool

    DOE Patents [OSTI]

    Southerland, Jr., James M.; Barringer, Jr., Curtis N.

    1994-01-01

    A tool for installing a gasket and a snap ring including a shaft, a first plate attached to the forward end of the shaft, a second plate slidably carried by the shaft, a spring disposed about the shaft between the first and second plates, and a sleeve that is free to slide over the shaft and engage the second plate. The first plate has a loading surface with a loading groove for receiving a snap ring and a shoulder for holding a gasket. A plurality of openings are formed through the first plate, communicating with the loading groove and approximately equally spaced about the groove. A plurality of rods are attached to the second plate, each rod slidable in one of the openings. In use, the loaded tool is inserted into a hollow pipe or pipe fitting having an internal flange and an internal seating groove, such that the gasket is positioned against the flange and the ring is in the approximate plane of the seating groove. The sleeve is pushed against the second plate, sliding the second plate towards the first plate, compressing the spring and sliding the rods forwards in the openings. The rods engage the snap ring and urge the ring from the loading groove into the seating groove.

  3. Ancillary-service details: Dynamic scheduling

    SciTech Connect (OSTI)

    Hirst, E.; Kirby, B.

    1997-01-01

    Dynamic scheduling (DS) is the electronic transfer from one control area to another of the time-varying electricity consumption associated with a load or the time-varying electricity production associated with a generator. Although electric utilities have been using this technique for at least two decades, its use is growing in popularity and importance. This growth is a consequence of the major changes under way in US bulk-power markets, in particular efforts to unbundle generation from transmission and to increase competition among generation providers. DS can promote competition and increase choices. It allows consumers to purchase certain services from entities outside their physical-host area and it allows generators to sell certain services to entities other than their physical host. These services include regulation (following minute-to-minute variations in load) and operating reserves, among others. Such an increase in the number of possible suppliers and customers should encourage innovation and reduce the costs and prices of providing electricity services. The purpose of the project reported here was to collect and analyze data on utility experiences with DS. Chapter 2 provides additional details and examples of the definitions of DS. Chapter 3 explains why DS might be an attractive service that customers and generators, as well as transmission providers, might wan to use. Chapter 4 presents some of the many current DS examples the authors uncovered in their interviews. Chapter 5 discusses the costs and cost-effectiveness of DS. Chapter 6 explains what they believe can and cannot be electronically moved from one control area to another, primarily in terms of the six ancillary services that FERC defined in Order 888. Chapter 7 discusses the need for additional research on DS.

  4. KP-NC-1-C Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NC-1-C Wholesale Power Rate Schedule KP-NC-1-C Wholesale Power Rate Schedule Area: Virginia PowerDuke Energy Progress System: Kerr-Philpott This rate schedule shall be available ...

  5. KP-DEP-1-C Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1-C Wholesale Power Rate Schedule KP-DEP-1-C Wholesale Power Rate Schedule Area: Duke Energy Progress System: Kerr-Philpott This rate schedule shall be available to public bodies ...

  6. KP-VA-3-C Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3-C Wholesale Power Rate Schedule KP-VA-3-C Wholesale Power Rate Schedule Area: Virginia Power System: Kerr-Philpott This rate schedule shall be available to public bodies and ...

  7. KP-DEP-4-C Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4-C Wholesale Power Rate Schedule KP-DEP-4-C Wholesale Power Rate Schedule Area: Duke Energy Progress System: Kerr-Philpott This rate schedule shall be available to public bodies ...

  8. KP-DEP-3-C Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3-C Wholesale Power Rate Schedule KP-DEP-3-C Wholesale Power Rate Schedule Area: Duke Energy Progress System: Kerr-Philpott This rate schedule shall be available to public bodies ...

  9. KP-VA-1-C Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1-C Wholesale Power Rate Schedule KP-VA-1-C Wholesale Power Rate Schedule Area: Virginia Power System: Kerr-Philpott This rate schedule shall be available to public bodies and ...

  10. KP-DEP-2-C Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2-C Wholesale Power Rate Schedule KP-DEP-2-C Wholesale Power Rate Schedule Area: Duke Energy Progress System: Kerr-Philpott This rate schedule shall be available to public bodies ...

  11. KP-VA-2-C Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2-C Wholesale Power Rate Schedule KP-VA-2-C Wholesale Power Rate Schedule Area: Virginia Power System: Kerr-Philpott This rate schedule shall be available to public bodies and ...

  12. KP-VA-4-C Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4-C Wholesale Power Rate Schedule KP-VA-4-C Wholesale Power Rate Schedule Area: Virginia Power System: Kerr-Philpott This rate schedule shall be available to public bodies and ...

  13. KP-AP-4-C Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AP-4-C Wholesale Power Rate Schedule KP-AP-4-C Wholesale Power Rate Schedule Area: American Electric Power System: Kerr-Philpott This rate schedule shall be available to public ...

  14. CP&L-4-B Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    4-B Wholesale Power Rate Schedule CP&L-4-B Wholesale Power Rate Schedule Area: Carolina Power & Light, Eastern Division System: Kerr-Philpott This rate schedule shall be available...

  15. CP&L-3-B Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    3-B Wholesale Power Rate Schedule CP&L-3-B Wholesale Power Rate Schedule Area: Carolina Power & Light, Eastern Division System: Kerr-Philpott This rate schedule shall be available...

  16. CP&L-2-B Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2-B Wholesale Power Rate Schedule CP&L-2-B Wholesale Power Rate Schedule Area: Carolina Power & Light, Eastern Division System: Kerr-Philpott This rate schedule shall be available...

  17. CP&L-1-B Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1-B Wholesale Power Rate Schedule CP&L-1-B Wholesale Power Rate Schedule Area: Carolina Power & Light, Eastern Division System: Kerr-Philpott This rate schedule shall be available...

  18. Edison is scheduled to move to a new facility building on 11...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    scheduled to move to a new facility building on 11302015 Edison is scheduled to move to a new facility building on 11302015 October 29, 2015 Edison is scheduled to be powered...

  19. Topic Index to the DOE Administrative Records Disposition Schedules

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5/21/07 TOPICINDEXTODOEADMINSCHEDULES Topic Index to the DOE Administrative Records Disposition Schedules (excluding the GRS Schedules) Topic Schedule Item [A] [B] [C] [D] [E] [F] [G] [H] [I] [J] [K] [L] [M] [N] [O] [P] [Q] [R] [S] [T] [U] [V] [W] [X] [Y] [Z] A Academic/Outreach Program 1 44 Access Request Files 18 6 Accountable Officers' Files 6 1 Accounting Administrative Files 6 5 Administrative Claims Files 6 10 Administrative Training Records 1 29.2 Administrative Issuances 16 1

  20. FY2016 PMCDP Training Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FY2016 PMCDP Training Schedule FY2016 PMCDP Training Schedule The FY 2016 PMCDP Training Schedule was built using data from the FY16 training needs survey completed by PoCs and SACMs, the strategic survey delivered to DoE's workforce in FAITAS, and historical data. The total number of PMCDP deliveries is consistent with the number of annual deliveries over the past 3 fiscal years, including courses ordered directly by the sites. PMCDP will continue to determine training needs based on input from

  1. Microsoft PowerPoint - Snippet 5.3 PARSII Analysis Schedule Health...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... some subtle differences as compared to the results using other software programs to run schedule health metrics; for example, running the same types of schedule health checks on ...

  2. EVMS Training Snippet: 5.3 PARSII Analysis: Schedule Health Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 PARSII Analysis: Schedule Health Assessment EVMS Training Snippet: 5.3 PARSII Analysis: Schedule Health Assessment This EVMS Training Snippet, sponsored by the Office of Project ...

  3. Microsoft Word - PoRiver Project Schedule - Letter to DOE_042807...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    20585 Re: Potomac River Project Outage Schedule Clarification Dear Mr. Mansueti: I am writing to clarify the upcoming outage schedule for the Potomac River project and to explain ...

  4. EVMS Training Snippet: 3.1A Integrated Master Schedule (IMS)...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and critical path the DOE can rely on to assess schedule performance, predictive analysis, and risk. This snippet is recommended whenever a schedule baseline is created or revised. ...

  5. A new storage-ring light source

    SciTech Connect (OSTI)

    Chao, Alex

    2015-06-01

    A recently proposed technique in storage ring accelerators is applied to provide potential high-power sources of photon radiation. The technique is based on the steady-state microbunching (SSMB) mechanism. As examples of this application, one may consider a high-power DUV photon source for research in atomic and molecular physics or a high-power EUV radiation source for industrial lithography. A less challenging proof-of-principle test to produce IR radiation using an existing storage ring is also considered.

  6. _PART I - THE SCHEDULE SECTION B-H

    National Nuclear Security Administration (NNSA)

    to Mod 0108 dated 7/30/15 DE-NA0000622 Section B - H, Page i PART I - THE SCHEDULE TABLE OF CONTENTS SECTION B ............................................................................................................................................................ 1 SUPPLIES OR SERVICES AND PRICES/COSTS .............................................................................................. 1 B-1 SERVICES BEING ACQUIRED

  7. Figure 5. Production Schedules at Two Development Rates for the...

    U.S. Energy Information Administration (EIA) Indexed Site

    5. Production Schedules at Two Development Rates for the 5 Percent Probability of Recovering 16.0 Billion Barrels of Technically Recoverable Oil from the ANWR Coastal Plain of...

  8. Figure 3. Production Schedules at Two Development Rates

    U.S. Energy Information Administration (EIA) Indexed Site

    3. Production Schedules at Two Development Rates for the 95 Percent Probability of Recovering 5.7 Billion Barrels of Technically Recoverable Oil from the ANWR Coastal Plain of...

  9. Center for Nanophase Materials Sciences (CNMS) - Hours & Scheduling

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    made in advance. 2016 ORNL Holiday Schedule New Year's Day Friday, January 1 Martin Luther King Jr.'s Birthday Monday, January 18 Good Friday (Easter) Friday, March 25 Memorial...

  10. Figure 3. Production Schedules at Two Development Rates

    U.S. Energy Information Administration (EIA) Indexed Site

    3. Production Schedules at Two Development Rates for the 95 Percent Probability of Recovering 5.7 Billion Barrels of Technically Recoverable Oil from the ANWR Coastal Plain of Alaska fig3.jpg (32189 bytes)

  11. Lab Ahead of Schedule Processing Waste in Large Boxes

    Broader source: Energy.gov [DOE]

    LOS ALAMOS, N.M. – The TRU Waste Program at Los Alamos National Laboratory is currently two months ahead of schedule processing and repackaging waste stored in large fiberglass-reinforced boxes (FRPs).

  12. Omega Laser Facility Schedule - Laboratory for Laser Energetics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Schedule - Laboratory for Laser Energetics Laboratory for Laser Energetics Logo Search Home Around the Lab Past Issues Past Quick Shots About Office of the Director Map to LLE LLE ...

  13. Exhibit D: Mirant Potomac River Schedule of Unit Operations:...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Supplement 3, January and February 2006 Exhibit D: Mirant Potomac River Schedule of Unit Operations: Supplement 3, January and February 2006 Docket No. EO-05-01: Exhibit D: Mirant ...

  14. Department Sets Aggressive Schedule for New Appliance Standards

    Broader source: Energy.gov [DOE]

    WASHINGTON, DC - The Department of Energy (DOE) today released a schedule for setting new appliance efficiency standards. The five-year plan outlines how DOE will work with  all of its partners to...

  15. Demand charge schedule data | OpenEI Community

    Open Energy Info (EERE)

    Demand charge schedule data Home > Groups > Utility Rate Hi, I'm a new user of this database,so first, thanks for creating it, and apologies if this question is answered in...

  16. Trident schedule FY16 -- rev 11-10-15.xlsx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Schedule FY 2015-16 11102015 28-Sep Material dynamics (gas gun) Loomis na 4 5-Oct 4 12-Oct 3 19-Oct maintenance 4 26-Oct AWE -- DTRA Davis - Sibley South ns 4 2-Nov ...

  17. Linux Kernel Co-Scheduling For Bulk Synchronous Parallel Applications...

    Office of Scientific and Technical Information (OSTI)

    Experimental results for a Linux implementation on a Cray XT5 machine are presented.1 The ... this new scheduling scheme, and that this design provides a dramatic improvement in ...

  18. EVMS Training Snippet: 3.2 Schedule Health Metrics

    Broader source: Energy.gov [DOE]

    This EVMS Training Snippet sponsored by the Office of Project Management (PM) focuses on ‘what’ the metrics are, ‘why’ they are important, and what they tell us about the schedule health. This...

  19. igure 4. Production Schedules at Two Development Rates for the...

    U.S. Energy Information Administration (EIA) Indexed Site

    4. Production Schedules at Two Development Rates for the Statistical Mean of Recovering 10.3 Billion Barrels of Technically Recoverable Oil from the ANWR Coastal Plain of Alaska ...

  20. Model Energy Savings Performance Contract, Schedules, and Exhibits |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Energy Savings Performance Contract, Schedules, and Exhibits Model Energy Savings Performance Contract, Schedules, and Exhibits An Energy Savings Performance Contract (ESPC) defines a project and establishes how it will be implemented during construction and how it will be managed through the entire term of the agreement, addressing construction details, roles and responsibilities of the Energy Service Company (ESCO) and the institution, and guaranteed savings through

  1. BTO Catalyst Seeks Entries, Webinars and Jamathons Scheduled | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Catalyst Seeks Entries, Webinars and Jamathons Scheduled BTO Catalyst Seeks Entries, Webinars and Jamathons Scheduled July 20, 2015 - 1:29pm Addthis This funding opportunity is closed. The DOE Building Technologies Office (BTO) is partnering with the successful SunShot Catalyst crowdsourcing competition to find software solutions to key challenges in the area of building operations, with over $1.5 million in total prize awards on the table! In the second 'Business Innovation' phase

  2. Hanford Facility Highlights EM's Success in Meeting Cost and Schedule

    Energy Savers [EERE]

    Targets | Department of Energy Facility Highlights EM's Success in Meeting Cost and Schedule Targets Hanford Facility Highlights EM's Success in Meeting Cost and Schedule Targets August 1, 2012 - 12:00pm Addthis EM Principal Deputy Assistant Secretary Tracy Mustin speaks during the operational kickoff event for the 200 West Pump and Treat System this month. EM Principal Deputy Assistant Secretary Tracy Mustin speaks during the operational kickoff event for the 200 West Pump and Treat System

  3. DOE Announces Yucca Mountain License Application Schedule | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Yucca Mountain License Application Schedule DOE Announces Yucca Mountain License Application Schedule July 19, 2006 - 3:13pm Addthis New Director Ward Sproat Testifies on Revised Timeline WASHINGTON, DC - The Department of Energy (DOE) today announced that it will submit a license application to the Nuclear Regulatory Commission (NRC) for a nuclear waste repository at Yucca Mountain, Nevada, no later than June 30, 2008. The Department also announced that if requested legislative

  4. EIA-423 and Schedule 2 of EIA-923

    U.S. Energy Information Administration (EIA) Indexed Site

    Historic Form EIA-423 & FERC-423 Detailed Data Beginning in 2008, data on monthly deliveries of fossil fuels to both utility and nonutility generating facilities are collected on Schedule 2 of the newer Form EIA-923 -- See EIA-923 detailed data Schedule 2. Survey form EIA-423 collected monthly nonutility fuel receipts and fuel quality files on plants with a fossil-fueled nameplate generating capacity of 50 or more megawatts. Detailed data are provided here on monthly deliveries of fossil

  5. ADMINISTRATIVE RECORDS SCHEDULE 5: BUDGET PREPARATION, PRESENTATION, AND

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    APPORTIONMENT RECORDS | Department of Energy 5: BUDGET PREPARATION, PRESENTATION, AND APPORTIONMENT RECORDS ADMINISTRATIVE RECORDS SCHEDULE 5: BUDGET PREPARATION, PRESENTATION, AND APPORTIONMENT RECORDS Budget and apportionment records include the various files accumulated in the course of formulating the budget for submission to the Office of Management and Budget (OMB) and to the Congress PDF icon ADMINISTRATIVE RECORDS SCHEDULE 5: BUDGET PREPARATION, PRESENTATION, AND APPORTIONMENT

  6. Security Improvements Project Completed Ahead of Schedule, $20 Million

    National Nuclear Security Administration (NNSA)

    Under Budget | National Nuclear Security Administration Security Improvements Project Completed Ahead of Schedule, $20 Million Under Budget April 07, 2014 WASHINGTON, D.C. - The National Nuclear Security Administration's (NNSA) Security Improvements Project (SIP) was recently completed ahead of schedule and approximately $20 million under its original budget of $72 million. SIP upgraded security at Y-12 by replacing existing alarm stations and access control systems with Argus, a

  7. Hanford Treats Groundwater Ahead of Schedule | Department of Energy

    Office of Environmental Management (EM)

    Treats Groundwater Ahead of Schedule Hanford Treats Groundwater Ahead of Schedule September 30, 2014 - 12:00pm Addthis A team of drillers installs a well to support groundwater treatment operations at the Hanford site. A team of drillers installs a well to support groundwater treatment operations at the Hanford site. Shown here is the exterior of the 200 West Groundwater Treatment Facility, DOE’s largest system for treating contaminated groundwater at the Hanford site. Contractor CH2M HILL

  8. DOE - NNSA/NFO -- Nuclear Testing Archive Fee Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nuclear Testing Archive > Fee Schedule NNSA/NFO Language Options U.S. DOE/NNSA - Nevada Field Office Nuclear Testing Archive (NTA) Fee Schedule The U.S. Department of Energy National Nuclear Security Administration Nuclear Testing Archive (NTA) is a centralized repository of publicly releasable documents on the subject of the U.S. Nuclear Weapons Testing Program. The Nuclear Testing Archive is operated for the NNSA by NSTec. Normal services provided to the public by the Nuclear Testing

  9. ADMINISTRATIVE RECORDS SCHEDULE 18: SECURITY, EMERGENCY PLANNING, AND

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SAFETY RECORDS | Department of Energy 8: SECURITY, EMERGENCY PLANNING, AND SAFETY RECORDS ADMINISTRATIVE RECORDS SCHEDULE 18: SECURITY, EMERGENCY PLANNING, AND SAFETY RECORDS Protection program records include the various files created by the Department to control and protect safeguards and security interests (e.g., classified information, sensitive unclassified information, special nuclear materials, nuclear weapons, other Government property) PDF icon ADMINISTRATIVE RECORDS SCHEDULE 18:

  10. Updates and Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Status Updates and Status Current Status: Up See the MOTD for live up to date information on NERSC systems Open Issues List of known problems and key issues we are actively working on. Read More » Genepool Featured Announcements A list of key Genepool announcements and system changes. Read More » Genepool Email Announcements Archive An archive of email announcements sent to NERSC users regarding Genepool. Read More » Announcements Move data from /projectb/projectdirs 5 March 2014, 3:13 pm

  11. Updates and Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Status Updates and Status Current Status: Retired on April 30, 2012 Announcements A list of key Franklin announcements and system changes. Read More » Email Announcements Archive An archive of email announcements sent to NERSC users regarding Franklin. Read More » Franklin Timeline This page records a brief timeline of significant events and user environment changes on Franklin. Read More » Last edited: 2016-04-29 11:34:24

  12. Transport from the Recycler Ring to the Antiproton Source Beamlines

    SciTech Connect (OSTI)

    Xiao, M.; /Fermilab

    2012-05-14

    In the post-NOvA era, the protons are directly transported from the Booster ring to the Recycler ring rather than the Main Injector. For Mu2e and g-2 project, the Debuncher ring will be modified into a Delivery ring to deliver the protons to both Mu2e and g-2 experiments. Therefore, it requires the transport of protons from the Recycler Ring to the Delivery ring. A new transfer line from the Recycler ring to the P1 beamline will be constructed to transport proton beam from the Recycler Ring to existing Antiproton Source beamlines. This new beamline provides a way to deliver 8 GeV kinetic energy protons from the Booster to the Delivery ring, via the Recycler, using existing beam transport lines, and without the need for new civil construction. This paper presents the Conceptual Design of this new beamline.

  13. Ring cavity for a Raman capillary waveguide amplifier

    DOE Patents [OSTI]

    Kurnit, N.A.

    1983-07-19

    Disclosed is a regenerative ring amplifier and regenerative ring oscillator which function to feed back a portion of the Stokes signal to complete the ring cavity. The ring cavity configuration allows the CO[sub 2] laser pump signal and Stokes signal to copropagate through the Raman capillary waveguide amplifier. A Raman capillary waveguide amplifier is also provided in the return leg of the ring cavity to increase gain without increasing the round trip time. Additionally, the ring cavity can be designed such that the amplifier Stokes signal is synchronous with the mode-locked spikes of the incoming CO[sub 2] laser pump signal. 6 figs.

  14. Ring cavity for a Raman capillary waveguide amplifier

    DOE Patents [OSTI]

    Kurnit, N.A.

    1981-01-27

    A regenerative ring amplifier and regenerative ring oscillator are described which function to feed back a portion of the Stokes signal to complete the ring cavity. The ring cavity configuration allows the CO/sub 2/ laser pump signal and Stokes signal to copropagate through the Raman capillary waveguide amplifier. A Raman capillary waveguide amplifier is also provided in the return leg of the ring cavity to increase gain without increasing the round trip time. Additionally, the ring cavity can be designed such that the amplified Stokes signal is synchronous with the mode-locked spikes of the incoming CO/sub 2/ laser pump signal.

  15. Ring cavity for a Raman capillary waveguide amplifir

    DOE Patents [OSTI]

    Kurnit, N.A.

    1981-01-27

    A regenerative ring amplifier and regenerative ring oscillator are described which function to feed back a portion of the Stokes signal to complete the ring cavity. The ring cavity configuration allows the CO/sub 2/ laser pump signal and Stokes signal to copropagate through the Raman capillary waveguide amplifier. A Raman capillary waveguide amplifier is also provided in the return leg of the ring cavity to increase gain without increasing the round trip time. Additionally, the ring cavity can be designed such that the amplified Stokes signal is synchronous with the mode-locked spikes of the incoming CO/sub 2/ laser pump signal.

  16. Ring cavity for a raman capillary waveguide amplifier

    DOE Patents [OSTI]

    Kurnit, Norman A.

    1983-07-19

    A regenerative ring amplifier and regenerative ring oscillator which function to feed back a portion of the Stokes signal to complete the ring cavity. The ring cavity configuration allows the CO.sub.2 laser pump signal and Stokes signal to copropagate through the Raman capillary waveguide amplifier. A Raman capillary waveguide amplifier is also provided in the return leg of the ring cavity to increase gain without increasing the round trip time. Additionally, the ring cavity can be designed such that the amplifier Stokes signal is synchronous with the mode-locked spikes of the incoming CO.sub.2 laser pump signal.

  17. Development of Improved Graphical Displays for an Advanced Outage Control Center, Employing Human Factors Principles for Outage Schedule Management

    SciTech Connect (OSTI)

    St Germain, Shawn Walter; Farris, Ronald Keith; Thomas, Kenneth David

    2015-09-01

    The long-term viability of existing nuclear power plants in the United States (U.S.) is dependent upon a number of factors, including maintaining high capacity factors, maintaining nuclear safety, and reducing operating costs, particularly those associated with refueling outages. Refueling outages typically take 20-30 days, and for existing light water NPPs in the U.S., the reactor cannot be in operation during the outage. Furthermore, given that many NPPs generate between $1-1.5 million/day in revenue when in operation, there is considerable interest in shortening the length of refueling outages. Yet refueling outages are highly complex operations, involving multiple concurrent and dependent activities that are somewhat challenging to coordinate; therefore, finding ways to improve refueling outage performance, while maintaining nuclear safety has proven to be difficult. The Advanced Outage Control Center (AOCC) project is a research and development (R&D) demonstration activity under the LWRS Program. LWRS is an R&D program that works closely with industry R&D programs to establish technical foundations for the licensing and managing of long-term, safe, and economical operation of current fleet of NPPs. As such, the LWRS Advanced Outage Control Center project has the goal of improving the management of commercial NPP refueling outages. To accomplish this goal, INL is developing an advanced outage control center (OCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. The overall focus is on developing an AOCC with the following capabilities that enables plant and OCC staff to; Collaborate in real-time to address emergent issues; Effectively communicate outage status to all workers involved in the outage; Effectively communicate discovered conditions in the field to the OCC; Provide real-time work status; Provide automatic pending support notifications; Provide real-time requirements monitoring; Maximize their collective situational awareness to improve decision-making; and Leverage macro data to better support resource allocation. INL has partnered with several commercial NPP utilities to develop a number of advanced outage management technologies. These outage management technologies have focused on both collaborative technologies for control centers and developing mobile technologies for NPP field workers. This report describes recent efforts made in developing a suite of outage technologies to support more effective schedule management. Currently, a master outage schedule is created months in advance using the plant’s existing scheduling software (e.g., Primavera P6). Typically, during the outage, the latest version of the schedule is printed at the beginning of each shift. INL and its partners are developing technologies that will have capabilities such as Automatic Schedule Updating, Automatic Pending Support Notifications, and the ability to allocate and schedule outage support task resources on a sub-hour basis (e.g., outage Micro-Scheduling). The remaining sections of this report describe in more detail the scheduling challenges that occur during outages, how the outage scheduling technologies INL is developing helps address those challenges, and the latest developments on this task (e.g., work accomplished to date and the path forward)

  18. Annual Hanford Site Environmental Permitting status report

    SciTech Connect (OSTI)

    SONNICHSEN, J.C.

    1999-10-18

    The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. Condition II.W further specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of this Permit Condition, ''best efforts'' mean submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies.

  19. Commission to Review the Effectiveness of the National Energy Laboratories, Phase II Meeting Schedule

    Broader source: Energy.gov [DOE]

    Commission to Review the Effectiveness of the National Energy Laboratories, Phase II Meeting Schedule

  20. Space Charge and Equilibrium Emittances in Damping Rings

    SciTech Connect (OSTI)

    Venturini, Marco; Oide, Katsunobu; Wolski, Andy

    2006-06-21

    We present a model of dynamics to account for the possible impact of space charge on the equilibrium emittances in storage rings and apply the model to study the current design of the International Linear Collider (ILC) damping rings.

  1. Reversible Seeding in Storage Rings (Conference) | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    Electron storage rings can drive high average power light sources, and free-electron ... By maintaining steady-state coherent microbunching at one point in the storage ring, the ...

  2. Ring Cycle for Dilating and Constricting the Nuclear Pore

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ring Cycle for Dilating and Constricting the Nuclear Pore Ring Cycle for Dilating and Constricting the Nuclear Pore Print Thursday, 13 June 2013 09:30 Pictured is an illustration...

  3. Dynein Motor Domain Shows Ring-Shaped Motor, Buttress

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Dynein Motor Domain Shows Ring-Shaped Motor, Buttress Dynein Motor Domain Shows Ring-Shaped Motor, Buttress Print Monday, 28 November 2011 14:52 Movement is fundamental to life. It...

  4. Acquisition & Financial Assistance Rules Status | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Acquisition & Financial Assistance Rules Status Acquisition & Financial Assistance Rules Status Subscribe to Acquisition & Financial Assistance Rules Status Updates PDF icon ...

  5. Integrated network design and scheduling problems : optimization algorithms and applications.

    SciTech Connect (OSTI)

    Nurre, Sarah G.; Carlson, Jeffrey J.

    2014-01-01

    We consider the class of integrated network design and scheduling problems. These problems focus on selecting and scheduling operations that will change the characteristics of a network, while being speci cally concerned with the performance of the network over time. Motivating applications of INDS problems include infrastructure restoration after extreme events and building humanitarian distribution supply chains. While similar models have been proposed, no one has performed an extensive review of INDS problems from their complexity, network and scheduling characteristics, information, and solution methods. We examine INDS problems under a parallel identical machine scheduling environment where the performance of the network is evaluated by solving classic network optimization problems. We classify that all considered INDS problems as NP-Hard and propose a novel heuristic dispatching rule algorithm that selects and schedules sets of arcs based on their interactions in the network. We present computational analysis based on realistic data sets representing the infrastructures of coastal New Hanover County, North Carolina, lower Manhattan, New York, and a realistic arti cial community CLARC County. These tests demonstrate the importance of a dispatching rule to arrive at near-optimal solutions during real-time decision making activities. We extend INDS problems to incorporate release dates which represent the earliest an operation can be performed and exible release dates through the introduction of specialized machine(s) that can perform work to move the release date earlier in time. An online optimization setting is explored where the release date of a component is not known.

  6. Gas insulated transmission line having tapered particle trapping ring

    DOE Patents [OSTI]

    Cookson, Alan H. (Pittsburgh, PA)

    1982-01-01

    A gas-insulated transmission line includes an outer sheath, an inner conductor, insulating supports and an insulating gas. A particle-trapping ring is secured to each insulating support, and it is comprised of a central portion and two tapered end portions. The ends of the particle trapping ring have a smaller diameter than the central portion of the ring, so as to enable the use of the particle trapping ring in a curved transmission line.

  7. Storage ring development at the National Synchrotron Light Source

    SciTech Connect (OSTI)

    Krinsky, S.; Bittner, J.; Fauchet, A.M.; Johnson, E.D.; Keane, J.; Murphy, J.; Nawrocky, R.J.; Rogers, J.; Singh, O.V.; Yu, L.H.

    1991-09-01

    This report contains papers on the following topics: Transverse Beam Profile Monitor; Bunch Length Measurements in the VUV Storage Ring; Photoelectric Effect Photon Beam Position Monitors; RF Receivers for Processing Electron Beam Pick-up Electrode Signals; Real-Time Global Orbit Feedback Systems; Local Orbit Feedback; Active Interlock System for High Power Insertion Devices in the X-ray Ring; Bunch Lengthening Cavity for the VUV Ring; SXLS Storage Ring Design.

  8. NWP Small Business Status through June 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Small Business Status through June 2014

  9. Damping ring rf system for SLC

    SciTech Connect (OSTI)

    Allen, M.A.; Schwarz, H.D.; Wilson, P.B.

    1983-01-01

    The linear collider project at SLAC contains two damping rings to reduce the emittance of short electron or positron bunches which contain 5 x 10/sup 10/ particles per bunch. Two of these bunches are stored at a time and then extracted for acceleration in the collider. The rf system is subject to strong transients in beam loading. A computer model is used to optimize capture while minimizing rf power. The introduction of phase jump in the rf drive at injection time together with offsets in the tuning loops of the rf cavities when no beam is stored allows optimum performance under heavy beam load conditions. The rf system (800 kV at 714 MHz) for the electron damping ring has been built, tested and installed, and is being tested with beam.

  10. SCE&G-1-E Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    1-E Wholesale Power Rate Schedule SCE&G-1-E Wholesale Power Rate Schedule Area: South Carolina Electric & Gas Area System: Georgia-Alabama-South Carolina This rate schedule shall be available public bodies and cooperatives (any one of which is hereinafter called the Customer) in South Carolina to whom power may be wheeled and scheduled pursuant to contracts between the Government and the South Carolina Electric & Gas Company (hereinafter called the Company). This rate schedule shall

  11. SCE&G-3-E Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    3-E Wholesale Power Rate Schedule SCE&G-3-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina This rate schedule shall be available public bodies and cooperatives (any one of which is hereinafter called the Customer) in South Carolina to whom power may be scheduled pursuant to contracts between the Government and the South Carolina Electric & Gas Company (hereinafter called the Company). This rate schedule shall be applicable to the sale at wholesale of

  12. Lean Flame Stabilization Ring - Energy Innovation Portal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Lean Flame Stabilization Ring Lawrence Berkeley National Laboratory Contact LBL About This Technology Technology Marketing SummaryRobert Cheng at Berkeley National Laboratory has developed a means for retrofitting existing burners to burn lean, premixed natural gas/air mixtures to reduce NOx emissions without sacrificing efficiency and burner design simplicity.DescriptionNew burner designs can also incorporate the basic principle of this device. This technology answers the needs of meeting clean

  13. ARM - Status and Actions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Status and Actions Campaign Details News Field Participants Resources Status and Actions ARM Data Discovery Browse Data Status and Actions For up-to-date campaign action, please see News 28.JUN.07 Requests for all field participants: Please place your preliminary data on the CHAPS ftp site no later than December. Connor Flynn has worked with ARM colleagues to give us a password protected FTP site. If you haven't received the instructions already from Connor regarding how to access the site,

  14. Microgrid Reliability Modeling and Battery Scheduling Using Stochastic Linear Programming

    SciTech Connect (OSTI)

    Cardoso, Goncalo; Stadler, Michael; Siddiqui, Afzal; Marnay, Chris; DeForest, Nicholas; Barbosa-Povoa, Ana; Ferrao, Paulo

    2013-05-23

    This paper describes the introduction of stochastic linear programming into Operations DER-CAM, a tool used to obtain optimal operating schedules for a given microgrid under local economic and environmental conditions. This application follows previous work on optimal scheduling of a lithium-iron-phosphate battery given the output uncertainty of a 1 MW molten carbonate fuel cell. Both are in the Santa Rita Jail microgrid, located in Dublin, California. This fuel cell has proven unreliable, partially justifying the consideration of storage options. Several stochastic DER-CAM runs are executed to compare different scenarios to values obtained by a deterministic approach. Results indicate that using a stochastic approach provides a conservative yet more lucrative battery schedule. Lower expected energy bills result, given fuel cell outages, in potential savings exceeding 6percent.

  15. Updates and Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Burst Buffer Cori Phase II Questions about Cori II Application Porting and Performance NESAP NERSC-8 Procurement Programming models File Storage and I/O Edison PDSF Genepool Testbeds Retired Systems Storage & File Systems Data & Analytics Connecting to NERSC Queues and Scheduling Job Logs & Statistics Application Performance Training & Tutorials Software Policies User Surveys NERSC Users Group User Announcements Help Staff Blogs Request Repository Mailing List Operations for:

  16. Drum ring removal/installation tool

    DOE Patents [OSTI]

    Andrade, William Andrew (Livermore, CA)

    2006-11-14

    A handheld tool, or a pair of such tools, such as for use in removing/installing a bolt-type clamping ring on a container barrel/drum, where the clamping ring has a pair of clamping ends each with a throughbore. Each tool has an elongated handle and an elongated lever arm transversely connected to one end of the handle. The lever arm is capable of being inserted into the throughbore of a selected clamping end and leveraged with the handle to exert a first moment on the selected clamping end. Each tool also has a second lever arm, such as a socket with an open-ended slot, which is suspended alongside the first lever arm. The second lever arm is capable of engaging the selected clamping end and being leveraged with the handle to exert a second moment which is orthogonal to the first moment. In this manner, the first and second moments operate to hold the selected clamping end fixed relative to the tool so that the selected clamping end may be controlled with the handle. The pair of clamping ends may also be simultaneously and independently controlled with the use of two handles/tools so as to contort the geometry of the drum clamping ring and enable its removal/installation.

  17. 200W Pump and Treat Construction Schedule Review

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    W Pump and Treat Construction Schedule Review Section C.2.5.3 - Task Order 11-001 The contractor shall provide the following project independent review services, as requested and as described below.. The Contractor shall perform these services in accordance with Contract DE-AC06-09RL14728, C.2.5.3, Portfolio Management, meet milestones and delivery schedules as established by the AMCP Groundwater and Vadose Zone Remediation Project team, and comply with established criteria. Task 200W P&T-1

  18. Redox shuttles having an aromatic ring fused to a 1,1,4,4-tetrasubstituted cyclohexane ring

    DOE Patents [OSTI]

    Weng, Wei; Zhang, Zhengcheng; Amine, Khalil

    2015-12-01

    An electrolyte includes an alkali metal salt; an aprotic solvent; and a redox shuttle additive including an aromatic compound having at least one aromatic ring fused with at least one non-aromatic ring, the aromatic ring having two or more oxygen or phosphorus-containing substituents.

  19. o CNMS Status Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Town Hall User Meeting (see attached slides) * Agenda: o Intro of UEC o CNMS Status Update o UEC activities o Nominations for open seat on the UEC * Activities o Monthly Telecon o...

  20. Small Business Status

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Teaming Arrangements on Small Business Status The Department of Energy is planning to set aside for small businesses a number of acquisitions of a very complex nature, requiring a ...

  1. NIF Status Update - 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    news NIF Status Update - 2014 May Gigabar Equation-of-State Experiment Reaches Record Pressures On May 29, the NIF Team fired two gigabar (Gbar)-class equation-of-state experiments...

  2. Fast Global File Status

    Energy Science and Technology Software Center (OSTI)

    2013-01-01

    Fast Global File Status (FGFS) is a system software package that implimints a scalable mechanism to retrieve file information, such as its degree of distribution or replication and consistency.

  3. Updates and Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Updates and Status Current Status: Up Open Issues List of known problems, submitted bug reports and issues we are actively working on Read More » Timeline and Updates A list of major system changes and updates Read More » Email Announcements Archive An archive of email announcements sent to NERSC users regarding Edison Read More » Last edited: 2016-04-29 11:34:32

  4. Status of Corrective Actions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WIPP AIB Report » Status of Corrective Actions Status of Corrective Actions at LANL Department of Energy Issues Accident Investigation Board (AIB) Report on February 14 Incident at the Waste Isolation Pilot Project in Carlsbad, New Mexico April 12, 2012 x x Contact Communication Office (505) 667-7000 Corrective Actions Undertaken by Los Alamos National Laboratory though a collaborative effort led by the Associate Director for Environmental Safety and Health (ADESH), the Associate Director for

  5. Safety system status monitoring

    SciTech Connect (OSTI)

    Lewis, J.R.; Morgenstern, M.H.; Rideout, T.H.; Cowley, P.J.

    1984-03-01

    The Pacific Northwest Laboratory has studied the safety aspects of monitoring the preoperational status of safety systems in nuclear power plants. The goals of the study were to assess for the NRC the effectiveness of current monitoring systems and procedures, to develop near-term guidelines for reducing human errors associated with monitoring safety system status, and to recommend a regulatory position on this issue. A review of safety system status monitoring practices indicated that current systems and procedures do not adequately aid control room operators in monitoring safety system status. This is true even of some systems and procedures installed to meet existing regulatory guidelines (Regulatory Guide 1.47). In consequence, this report suggests acceptance criteria for meeting the functional requirements of an adequate system for monitoring safety system status. Also suggested are near-term guidelines that could reduce the likelihood of human errors in specific, high-priority status monitoring tasks. It is recommended that (1) Regulatory Guide 1.47 be revised to address these acceptance criteria, and (2) the revised Regulatory Guide 1.47 be applied to all plants, including those built since the issuance of the original Regulatory Guide.

  6. Optical heterodyne detection for cavity ring-down spectroscopy

    DOE Patents [OSTI]

    Levenson, Marc D.; Paldus, Barbara A.; Zare, Richard N.

    2000-07-25

    A cavity ring-down system for performing cavity ring-down spectroscopy (CRDS) using optical heterodyne detection of a ring-down wave E.sub.RD during a ring-down phase or a ring-up wave E.sub.RU during a ring up phase. The system sends a local oscillator wave E.sub.LO and a signal wave E.sub.SIGNAL to the cavity, preferably a ring resonator, and derives an interference signal from the combined local oscillator wave E.sub.LO and the ring-down wave E.sub.RD (or ring-up wave E.sub.RU). The local oscillator wave E.sub.LO has a first polarization and the ring-down wave E.sub.RD has a second polarization different from the first polarization. The system has a combining arrangement for combining or overlapping local oscillator wave E.sub.LO and the ring-down wave E.sub.RD at a photodetector, which receives the interference signal and generates a heterodyne current I.sub.H therefrom. Frequency and phase differences between the waves are adjustable.

  7. Collective accelerator using field-reversed plasma rings

    SciTech Connect (OSTI)

    Hartman, C.W.

    1981-09-19

    This note discusses the possibility of magnetically accelerating the plasma rings. At low-to-moderate ring kinetic energy, application to heating, fueling, and efficient current drive of conventional fusion reactors appears possible. At high ring kinetic energy, applications to inertial-confinement fusion through pellet heating and to transuranic element synthesis appear possible. The rings may be considered to be a self-linking flux bundle having net helicity. From an accelerator point of view, the rings represent collective particle entities held together by magnetic forces and may be viewed as macroparticles or micropellets having large magnetic moment per unit mass. Because of the relatively long lifetime and resiliency of the rings, it appears possible to accelerate to multimegajoule kinetic energy over reasonable distances and to focus the rings to centimeter-size dimensions.

  8. Joining mechanism with stem tension and interlocked compression ring

    DOE Patents [OSTI]

    James, Allister W.; Morrison, Jay A.

    2012-09-04

    A stem (34) extends from a second part (30) through a hole (28) in a first part (22). A groove (38) around the stem provides a non-threaded contact surface (42) for a ring element (44) around the stem. The ring element exerts an inward force against the non-threaded contact surface at an angle that creates axial tension (T) in the stem, pulling the second part against the first part. The ring element is formed of a material that shrinks relative to the stem by sintering. The ring element may include a split collet (44C) that fits partly into the groove, and a compression ring (44E) around the collet. The non-threaded contact surface and a mating distal surface (48) of the ring element may have conic geometries (64). After shrinkage, the ring element is locked onto the stem.

  9. Mechanical seal having a double-tier mating ring

    DOE Patents [OSTI]

    Khonsari, Michael M.; Somanchi, Anoop K.

    2005-09-13

    An apparatus and method to enhance the overall performance of mechanical seals in one of the following ways: by reducing seal face wear, by reducing the contact surface temperature, or by increasing the life span of mechanical seals. The apparatus is a mechanical seal (e.g., single mechanical seals, double mechanical seals, tandem mechanical seals, bellows, pusher mechanical seals, and all types of rotating and reciprocating machines) comprising a rotating ring and a double-tier mating ring. In a preferred embodiment, the double-tier mating ring comprises a first and a second stationary ring that together form an agitation-inducing, guided flow channel to allow for the removal of heat generated at the seal face of the mating ring by channeling a coolant entering the mating ring to a position adjacent to and in close proximity with the interior surface area of the seal face of the mating ring.

  10. Status of the MEIC ion collider ring design (Conference) | SciTech...

    Office of Scientific and Technical Information (OSTI)

    components, fits readily on the JLab site, offers a straightforward path for a future full-energy upgrade by replacing the magnets with higher-field ones in the same tunnel, and ...

  11. Status of the MEIC ion collider ring design (Conference) | SciTech...

    Office of Scientific and Technical Information (OSTI)

    We describe complete ion collider optics including an independently-designed modular detector region. Authors: Morozov, Vasiliy ; Derbenev, Yaroslav ; Harwood, Leigh ; Hutton, ...

  12. Current Status of the WArP Experiment

    SciTech Connect (OSTI)

    Szelc, A. M.

    2009-04-17

    The WArP Collaboration is getting ready to run the WArP 100 liter detector in the Underground laboratory in Gran Sasso, Italy. The new detector, scheduled to run in 2008, should improve the current sensitivity limits by a factor of 10. Meanwhile, an active R and D program is being conducted. The highlights of this program, namely the runs with Argon depleted in the radioactive isotope {sup 39}Ar currently in preparation and the measurements of the effects of contamination with Nitrogen and Oxygen on the Liquid Argon effective light yield will be presented as well as the current status of the 100 liter detector.

  13. Web Operational Status Boards

    SciTech Connect (OSTI)

    2004-04-16

    Web Operational Status Boards (WebOSB)is a web-based application designed to acquire, display, and update highly dynamic status information between multiple users and jurisdictions. WebOSB is able to disseminate real-time status information?support the timely sharing of information?with constant, dynamic updates via personal computers and the Internet between emergency operations centers (EOCs), incident command centers, and to users outside the EOC who need to know the information (hospitals, shelters, schools). The WebOSB application far exceeds outdated information-sharing methods used by emergency workers: whiteboards, Word and Excel documents, or even locality-specific Web sites. WebOSB?s capabilities include the following elements: - Secure access. Multiple users can access information on WebOSB from any personal computer with Internet access and a secure ID. Privileges are use to control access and distribution of status information and to identify users who are authorized to add or edit information. - Simultaneous update. WebOSB provides options for users to add, display, and update dynamic information simultaneously at all locations involved in the emergency management effort, A single status board can be updated from multiple locations enabling shelters and hospitals to post bed availability or list decontamination capability. - On-the-fly modification. Allowing the definition of an existing status board to be modified on-the-fly can be an asset during an emergency, where information requirements can change quickly. The status board designer feature allows an administrator to quickly define, modi,, add to, and implement new status boards in minutes without needing the help of Web designers and computer programmers. - Publisher/subscriber notification. As a subscriber, each user automatically receives notification of any new information relating to specific status boards. The publisher/subscriber feature automatically notified each user of any new information relating to specific status boards. WebOSB can be installed to fit the specific needs of an emergency management community. Because it was originally developed to concurrently support multiple EOCs at the local, county, and state level, it can also support multi-user environments for other types of projects.

  14. Web Operational Status Boards

    Energy Science and Technology Software Center (OSTI)

    2004-04-16

    Web Operational Status Boards (WebOSB)is a web-based application designed to acquire, display, and update highly dynamic status information between multiple users and jurisdictions. WebOSB is able to disseminate real-time status information—support the timely sharing of information—with constant, dynamic updates via personal computers and the Internet between emergency operations centers (EOCs), incident command centers, and to users outside the EOC who need to know the information (hospitals, shelters, schools). The WebOSB application far exceeds outdated information-sharingmore » methods used by emergency workers: whiteboards, Word and Excel documents, or even locality-specific Web sites. WebOSB’s capabilities include the following elements: - Secure access. Multiple users can access information on WebOSB from any personal computer with Internet access and a secure ID. Privileges are use to control access and distribution of status information and to identify users who are authorized to add or edit information. - Simultaneous update. WebOSB provides options for users to add, display, and update dynamic information simultaneously at all locations involved in the emergency management effort, A single status board can be updated from multiple locations enabling shelters and hospitals to post bed availability or list decontamination capability. - On-the-fly modification. Allowing the definition of an existing status board to be modified on-the-fly can be an asset during an emergency, where information requirements can change quickly. The status board designer feature allows an administrator to quickly define, modi,, add to, and implement new status boards in minutes without needing the help of Web designers and computer programmers. - Publisher/subscriber notification. As a subscriber, each user automatically receives notification of any new information relating to specific status boards. The publisher/subscriber feature automatically notified each user of any new information relating to specific status boards. WebOSB can be installed to fit the specific needs of an emergency management community. Because it was originally developed to concurrently support multiple EOCs at the local, county, and state level, it can also support multi-user environments for other types of projects.« less

  15. 2015 Princeton-CEFRC Summer School on Combustion - Schedule of...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Princeton-CEFRC Summer School on Combustion - Schedule of Events Sunday, June 21 st 13:00 - 17:00 Check In 15:00 - 18:00 Lab Tour (EQuad) 1 st tour 3:00pm; 2 nd tour 4:30pm;...

  16. Automation Status | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Automation Status Automation Status Presented at the NREL Hydrogen and Fuel Cell Manufacturing R&D Workshop in Washington, DC, August 11-12, 2011. PDF icon Automation Status More Documents & Publications PEM Stack Manufacturing: Industry Status 2011 NREL/DOE Hydrogen and Fuel Cell Manufacturing R&D Workshop Report Manufacturing Barriers to High Temperature PEM Commercialization

  17. Self-seeding ring optical parametric oscillator

    DOE Patents [OSTI]

    Smith, Arlee V.; Armstrong, Darrell J.

    2005-12-27

    An optical parametric oscillator apparatus utilizing self-seeding with an external nanosecond-duration pump source to generate a seed pulse resulting in increased conversion efficiency. An optical parametric oscillator with a ring configuration are combined with a pump that injection seeds the optical parametric oscillator with a nanosecond duration, mJ pulse in the reverse direction as the main pulse. A retroreflecting means outside the cavity injects the seed pulse back into the cavity in the direction of the main pulse to seed the main pulse, resulting in higher conversion efficiency.

  18. On the evolution of vortex rings with swirl

    SciTech Connect (OSTI)

    Naitoh, Takashi, E-mail: naitoh.takashi@nitech.ac.jp [Department of Engineering Physics, Electronics and Mechanics, Graduate School of Engineering, Nagoya Institute of Technology, Gokiso-cho, Showa-ku, Nagoya 466-8555 (Japan); Okura, Nobuyuki, E-mail: ohkura@meijo-u.ac.jp [Department of Vehicle and Mechanical Engineering, Meijo University, 1-501 Shiogamaguchi Tempaku-ku, Nagoya 468-8502 (Japan); Gotoh, Toshiyuki, E-mail: gotoh.toshiyuki@nitech.ac.jp [Department of Scientific and Engineering Simulation, Graduate School of Engineering, Nagoya Institute of Technology, Gokiso-cho, Showa-ku, Nagoya 466-8555 (Japan); Kato, Yusuke [Controller Business Unit Engineering Division 1, Engineering Department 3, Denso Wave Incorporated, 1 Yoshiike Kusagi Agui-cho, Chita-gun Aichi 470-2297 (Japan)

    2014-06-15

    A laminar vortex ring with swirl, which has the meridional velocity component inside the vortex core, was experimentally generated by the brief fluid ejection from a rotating outlet. The evolution of the vortex ring was investigated with flow visualizations and particle image velocimetry measurements in order to find the influence of swirling flow in particular upon the transition to turbulence. Immediately after the formation of a vortex ring with swirl, a columnar strong vortex along the symmetric axis is observed in all cases of the present experiment. Then the characteristic fluid discharging from a vortex ring with swirl referred to as peeling off appears. The amount of discharging fluid due to the peeling off increases with the angular velocity of the rotating outlet. We conjectured that the mechanism generating the peeling off is related to the columnar strong vortex by close observations of the spatio-temporal development of the vorticity distribution and the cutting 3D images constructed from the successive cross sections of a vortex ring. While a laminar vortex ring without swirl may develop azimuthal waves around its circumference at some later time and the ring structure subsequently breaks, the swirling flow in a vortex ring core reduces the amplification rate of the azimuthal wavy deformation and preserved its ring structure. Then the traveling distance of a vortex ring can be extended using the swirl flow under certain conditions.

  19. STAR FORMATION IN NUCLEAR RINGS OF BARRED GALAXIES

    SciTech Connect (OSTI)

    Seo, Woo-Young; Kim, Woong-Tae E-mail: wkim@astro.snu.ac.kr

    2013-06-01

    Nuclear rings in barred galaxies are sites of active star formation. We use hydrodynamic simulations to study the temporal and spatial behavior of star formation occurring in nuclear rings of barred galaxies where radial gas inflows are triggered solely by a bar potential. The star formation recipes include a density threshold, an efficiency, conversion of gas to star particles, and delayed momentum feedback via supernova explosions. We find that the star formation rate (SFR) in a nuclear ring is roughly equal to the mass inflow rate to the ring, while it has a weak dependence on the total gas mass in the ring. The SFR typically exhibits a strong primary burst followed by weak secondary bursts before declining to very small values. The primary burst is associated with the rapid gas infall to the ring due to the bar growth, while the secondary bursts are caused by re-infall of the ejected gas from the primary burst. While star formation in observed rings persists episodically over a few Gyr, the duration of active star formation in our models lasts for only about half of the bar growth time, suggesting that the bar potential alone is unlikely to be responsible for gas supply to the rings. When the SFR is low, most star formation occurs at the contact points between the ring and the dust lanes, leading to an azimuthal age gradient of young star clusters. When the SFR is large, on the other hand, star formation is randomly distributed over the whole circumference of the ring, resulting in no apparent azimuthal age gradient. Since the ring shrinks in size with time, star clusters also exhibit a radial age gradient, with younger clusters found closer to the ring. The cluster mass function is well described by a power law, with a slope depending on the SFR. Giant gas clouds in the rings have supersonic internal velocity dispersions and are gravitationally bound.

  20. The Super-B Project Accelerator Status

    SciTech Connect (OSTI)

    Biagini, M.E.; Alesini, D.; Boni, R.; Boscolo, M.; Demma, T.; Drago, A.; Esposito, M.; Guiducci, S.; Marcellini, F.; Mazzitelli, G.; Preger, M.; Raimondi, P.; Sanelli, C.; Serio, M.; Stecchi, A.; Stella, A.; Tomassini, S.; Zobov, M.; Bertsche, K.; Brachmann, A.; Cai, Y.; /SLAC /Novosibirsk, IYF /Annecy, LAPP /LPSC, Grenoble /Orsay, LAL /Saclay /Pisa U. /CERN

    2011-08-17

    The SuperB project is an international effort aiming at building in Italy a very high luminosity e{sup +}e{sup -} (10{sup 36} cm{sup -2} sec{sup -1}) asymmetric collider at the Y(4S) energy in the CM. The accelerator design has been extensively studied and changed during the past year. The present design, based on the new collision scheme, with large Piwinski angle and the use of 'crab waist' sextupoles already successfully tested at the DA{Phi}NE {Phi}-Factory at LNF Frascati, provides larger flexibility, better dynamic aperture and spin manipulation sections in the Low Energy Ring (LER) for longitudinal polarization of the electron beam at the Interaction Point (IP). The Interaction Region (IR) has been further optimized in terms of apertures and reduced backgrounds in the detector. The injector complex design has been also updated. A summary of the project status will be presented in this paper. The SuperB collider can reach a peak luminosity of 10{sup 36} cm{sup -2} sec{sup -1} with beam currents and bunch lengths similar to those of the past and present e{sup +}e{sup -} Factories, through the use of smaller emittances and new scheme of crossing angle collision. The beams are stored in two rings at 6.7 GeV (HER) and 4.2 GeV (LER). Unique features of the project are the polarization of the electron beam in the LER and the possibility to decrease the energies for running at the {tau}/charm threshold. The option to reuse the PEP-II B-Factory (SLAC) hardware will allow reducing costs. The SuperB facility will require a big complex of civil infrastructure. The main construction, which will house the final part of the LINAC, the injection lines, the damping rings, and the storage rings, will be mainly underground. Two sites have been considered: the campus of Tor Vergata University near Frascati, and the INFN Frascati Laboratory. No decision has been made yet. A footprint of the possible SuperB layout on the LNF area is shown in Fig. 1.

  1. Design Considerations for High Energy Electron -- Positron Storage Rings

    DOE R&D Accomplishments [OSTI]

    Richter, B.

    1966-11-01

    High energy electron-positron storage rings give a way of making a new attack on the most important problems of elementary particle physics. All of us who have worked in the storage ring field designing, building, or using storage rings know this. The importance of that part of storage ring work concerning tests of quantum electrodynamics and mu meson physics is also generally appreciated by the larger physics community. However, I do not think that most of the physicists working tin the elementary particle physics field realize the importance of the contribution that storage ring experiments can make to our understanding of the strongly interacting particles. I would therefore like to spend the next few minutes discussing the sort of things that one can do with storage rings in the strongly interacting particle field.

  2. Graphene Layer Growth: Collision of Migrating Five-MemberRings

    SciTech Connect (OSTI)

    Whitesides, Russell; Kollias, Alexander C.; Domin, Dominik; Lester Jr., William A.; Frenklach, Michael

    2005-12-02

    A reaction pathway is explored in which two cyclopenta groups combine on the zigzag edge of a graphene layer. The process is initiated by H addition to a five-membered ring, followed by opening of that ring and the formation of a six-membered ring adjacent to another five-membered ring. The elementary steps of the migration pathway are analyzed using density functional theory to examine the region of the potential energy surface associated with the pathway. The calculations are performed on a substrate modeled by the zigzag edge of tetracene. Based on the obtained energetics, the dynamics of the system are analyzed by solving the energy transfer master equations. The results indicate energetic and reaction-rate similarity between the cyclopenta combination and migration reactions. Also examined in the present study are desorption rates of migrating cyclopenta rings which are found to be comparable to cyclopenta ring migration.

  3. Graphene Layer Growth Chemistry: Five-Six-Ring Flip Reaction

    SciTech Connect (OSTI)

    Whitesides, R.; Domin, D.; Salomon-Ferrer, R.; Lester Jr., W.A.; Frenklach, M.

    2007-12-01

    Reaction pathways are presented for hydrogen-mediated isomerization of a five and six member carbon ring complex on the zigzag edge of a graphene layer. A new reaction sequence that reverses orientation of the ring complex, or 'flips' it, was identified. Competition between the flip reaction and 'ring separation' was examined. Ring separation is the reverse of the five and six member ring complex formation reaction, previously reported as 'ring collision'. The elementary steps of the pathways were analyzed using density-functional theory (DFT). Rate coefficients were obtained by solution of the energy master equation and classical transition state theory utilizing the DFT energies, frequencies, and geometries. The results indicate that the flip reaction pathway dominates the separation reaction and should be competitive with other pathways important to the graphene zigzag edge growth in high temperature environments.

  4. Radiation Worker II Class Scheduled for Aug. 20; Sign up by Aug...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Radiation Worker II Class Scheduled for Aug. 20; Sign up by Aug. 19 A Radiation Worker II (SAF802) class is scheduled for Thursday, Aug. 20, from 9 a.m. - 12 noon. The class will...

  5. Rotary Firing in Ring-Shaped Protein Explains Unidirectionality

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Rotary Firing in Ring-Shaped Protein Explains Unidirectionality Rotary Firing in Ring-Shaped Protein Explains Unidirectionality Print Wednesday, 28 April 2010 00:00 Hexameric motor proteins represent a complex class of molecular machines that variously push and pull on biological molecules using adenosine triphosphate (ATP) as chemical fuel. A specialized class of ring-shaped motor proteins, hexameric helicases, can unwind DNA strands and perform large-scale manipulations of single-stranded

  6. Ring Cycle for Dilating and Constricting the Nuclear Pore

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ring Cycle for Dilating and Constricting the Nuclear Pore Ring Cycle for Dilating and Constricting the Nuclear Pore Print Thursday, 13 June 2013 09:30 Pictured is an illustration of several nuclear pore complexes (NPCs) embedded in a cell nucleus. NPCs act as gatekeepers between a cell's cytoplasm and its nucleus. Based on crystallographic analyses, Sozanne R. Solmaz et al. uncover the molecular mechanism that underlies the large changes in diameter of NPCs and suggest a "ring cycle"

  7. Vertical Emmittance Studies at the ATF Damping Ring (Technical Report) |

    Office of Scientific and Technical Information (OSTI)

    SciTech Connect Vertical Emmittance Studies at the ATF Damping Ring Citation Details In-Document Search Title: Vertical Emmittance Studies at the ATF Damping Ring A primary purpose of the ATF Damping Ring is to demonstrate the small vertical emittance required for a future linear collider. In this report, we first describe the diagnostics available to measure this emittance. Then we discuss the dependence of the emittance on various parameters, such as the betatron tunes, vacuum pressure,

  8. CU-CBR-1-I Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CBR-1-I Wholesale Power Rate Schedule CU-CBR-1-I Wholesale Power Rate Schedule Area: Big Rivers and Henderson, KY System: CU This rate schedule shall be available to Big Rivers Electric Corporation and includes the City of Henderson, Kentucky. This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereinafter called

  9. CU-CC-1-J Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CC-1-J Wholesale Power Rate Schedule CU-CC-1-J Wholesale Power Rate Schedule Area: Duke Energy Progress, Western Division System: CU This rate schedule shall be available to public bodies and cooperatives served through the facilities of Duke Energy Progress (formerly known as Carolina Power & Light Company), Western Division (hereinafter called the Customers). This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek,

  10. CU-CEK-1-I Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CEK-1-I Wholesale Power Rate Schedule CU-CEK-1-I Wholesale Power Rate Schedule Area: East Kentucky System: CU This rate schedule shall be available to East Kentucky Power Cooperative (hereinafter called the Customer). This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereinafter called collectively the

  11. CU-CK-1-I Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CK-1-I Wholesale Power Rate Schedule CU-CK-1-I Wholesale Power Rate Schedule Area: Kentucky Utilities System: CU This rate schedule shall be available to public bodies served through the facilities of Kentucky Utilities Company, (hereinafter called the Customers.) This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being

  12. CU-CM-1-I Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CM-1-I Wholesale Power Rate Schedule CU-CM-1-I Wholesale Power Rate Schedule Area: MEAM, MDEA, and SMEPA System: CU This rate schedule shall be available to the South Mississippi Electric Power Association, Municipal Energy Agency of Mississippi, and Mississippi Delta Energy Agency. This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such

  13. CU-CSI-1-I Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CSI-1-I Wholesale Power Rate Schedule CU-CSI-1-I Wholesale Power Rate Schedule Area: Southern Illinois System: CU This rate schedule shall be available to Southern Illinois Power Cooperative (hereinafter the Customer). This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereinafter called collectively the

  14. CU-CTV-1-I Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CTV-1-I Wholesale Power Rate Schedule CU-CTV-1-I Wholesale Power Rate Schedule Area: Tennessee Valley Authority System: CU This rate schedule shall be available to the Tennessee Valley Authority (hereinafter called TVA). This rate schedule shall be applicable to electric capacity and energy generated at the Dale Hollow, Center Hill, Wolf Creek, Old Hickory, Cheatham, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereafter called collectively the "Cumberland

  15. CU-CTVI-1-B Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CTVI-1-B Wholesale Power Rate Schedule CU-CTVI-1-B Wholesale Power Rate Schedule Area: Former customers of TVA System: Cumberland This rate schedule shall be available to customers (hereinafter called the Customer) who are or were formerly in the Tennessee Valley Authority (hereinafter called TVA) service area. This rate schedule shall be applicable to electric capacity and energy generated at the Dale Hollow, Center Hill, Wolf Creek, Old Hickory, Cheatham, Barkley, J. Percy Priest, and Cordell

  16. POLICY GUIDANCE MEMORANDUM #02 Using Schedule A Hiring Authority for ARRA Positions (Expired)

    Broader source: Energy.gov [DOE]

    THIS GUIDANCE HAS EXPIRED Guidance on Using Schedule A Hiring Authority for American Recovery and Reinvestment Act of 2009

  17. KP-AP-1-C Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1-C Wholesale Power Rate Schedule KP-AP-1-C Wholesale Power Rate Schedule Area: American Electric Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia to whom power may be transmitted and scheduled pursuant to contracts between the Government, American Electric Power Service Corporation (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection

  18. KP-AP-3-C Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3-C Wholesale Power Rate Schedule KP-AP-3-C Wholesale Power Rate Schedule Area: American Electric Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia to whom power may be scheduled pursuant to contracts between the Government, American Electric Power Service Corporation (hereinafter called the Company), PJM Interconnection LLC (hereinafter called PJM), and the Customer. This rate

  19. SCE&G-2-E Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    2-E Wholesale Power Rate Schedule SCE&G-2-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina This rate schedule shall be available public bodies and cooperatives (any one of which is hereinafter called the Customer) in South Carolina to whom power may be wheeled pursuant to contracts between the Government and the South Carolina Electric & Gas Company (hereinafter called the Company). This rate schedule shall be applicable to the sale at wholesale of power

  20. SCE&G-4-E Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    4-E Wholesale Power Rate Schedule SCE&G-4-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina This rate schedule shall be available public bodies and cooperatives (any one of which is hereinafter called the Customer) in South Carolina served through the transmission facilities of South Carolina Electric & Gas Company (hereinafter called the Company). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at

  1. KP-Replacement-2-B Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Replacement-2-B Wholesale Power Rate Schedule KP-Replacement-2-B Wholesale Power Rate Schedule Area: Replacement Energy System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and Virginia to whom power is provided pursuant to contracts between the Government and the customer from the John H. Kerr and Philpott Projects (or Kerr-Philpott System). This rate schedule shall be applicable to

  2. Descriptions of ESPC Task Order Schedules and Placement of Pricing Information (IDIQ Attachment J-5)

    Office of Energy Efficiency and Renewable Energy (EERE)

    Document provides task order schedule descriptions and information on the placement of pricing for energy savings performance contracts (ESPCs).

  3. Tool for Generating Realistic Residential Hot Water Event Schedules: Preprint

    SciTech Connect (OSTI)

    Hendron, B.; Burch, J.; Barker, G.

    2010-08-01

    The installed energy savings for advanced residential hot water systems can depend greatly on detailed occupant use patterns. Quantifying these patterns is essential for analyzing measures such as tankless water heaters, solar hot water systems with demand-side heat exchangers, distribution system improvements, and recirculation loops. This paper describes the development of an advanced spreadsheet tool that can generate a series of year-long hot water event schedules consistent with realistic probability distributions of start time, duration and flow rate variability, clustering, fixture assignment, vacation periods, and seasonality. This paper also presents the application of the hot water event schedules in the context of an integral-collector-storage solar water heating system in a moderate climate.

  4. Vertical Emmittance Studies at the ATF Damping Ring (Technical...

    Office of Scientific and Technical Information (OSTI)

    Visit OSTI to utilize additional information resources in energy science and technology. A ... A primary purpose of the ATF Damping Ring is to demonstrate the small vertical emittance ...

  5. A Compact Ring Design with Tunable Momentum Compaction

    SciTech Connect (OSTI)

    Sun, Y.; ,

    2012-05-17

    A storage ring with tunable momentum compaction has the advantage in achieving different RMS bunch length with similar RF capacity, which is potentially useful for many applications, such as linear collider damping ring and predamping ring where injected beam has a large energy spread and a large transverse emittance. A tunable bunch length also makes the commissioning and fine tuning easier in manipulating the single bunch instabilities. In this paper, a compact ring design based on a supercell is presented, which achieves a tunable momentum compaction while maintaining a large dynamic aperture.

  6. Used Fuel Disposition Campaign Phase I Ring Compression Testing...

    Energy Savers [EERE]

    Phase I Ring Compression Testing of High Burnup Cladding Used Fuel Disposition Campaign ... of the technical basis for extended storage and transportation of high-burnup fuel. ...

  7. A Shallow Attenuating Anomaly Inside The Ring Fracture Of The...

    Open Energy Info (EERE)

    Roberts,Keiiti Aki,Michael C. Fehler. 1995. A Shallow Attenuating Anomaly Inside The Ring Fracture Of The Valles Caldera, New Mexico. Journal of Volcanology and Geothermal...

  8. Exploration of the Versatility of Ring Opening Metathesis Polymerizati...

    Office of Scientific and Technical Information (OSTI)

    of Ring Opening Metathesis Polymerization: an Approach for Gaining Access to Low Density Polymeric Aerogels Citation Details In-Document Search Title: Exploration of the...

  9. Future Synchrotron Light Sources Based on Ultimate Storage Rings...

    Office of Scientific and Technical Information (OSTI)

    Furthermore, because of the experience accumulatedmore over many decades of ring operation, it would have the great advantage of stability and reliability. In this paper we ...

  10. First Magnet Girder Installed in NSLS-II Storage Ring

    ScienceCinema (OSTI)

    Frank Lincoln

    2013-07-19

    Supervisor Frank Lincoln explains how the first magnet girder is installed in the storage ring of Brookhaven National Laboratory's National Synchrotron Light Source II (NSLS-II).

  11. Reversible Seeding in Storage Rings (Conference) | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    We propose to generate steady-state microbunching in a storage ring with a reversible seeding scheme. High gain harmonic generation (HGHG) and echo-enabled harmonic generation ...

  12. Rotary Firing in Ring-Shaped Protein Explains Unidirectionality

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Rotary Firing in Ring-Shaped Protein Explains Unidirectionality Print Hexameric motor proteins represent a complex class of molecular machines that variously push and pull on...

  13. More Powerful, Longer-Lasting Batteries Rings Around the Earth

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Powerful, Longer-Lasting Batteries Rings Around the Earth A QUARTERLY RESEARCH & ... powerful, longer-lasting and smaller batteries for our modern electronic devices (page 4). ...

  14. Glueballs: a status report

    SciTech Connect (OSTI)

    Scharre, D.L.

    1982-01-01

    It is expected from quantum chromodynamics (QCD) that glueballs, bound states which contain gluons but no valence quarks, should exist. To date, no conclusive evidence for glueballs has been presented. After a brief review of the expected properties and experimental signatures of glueballs the status of some glueball candidate states are discussed.

  15. ORISE Contract, PART I - SCHEDULE, Section E Inspection and Acceptance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    E INSPECTION AND ACCEPTANCE E.1 52.246-5 INSPECTION OF SERVICES - COST-REIMBURSEMENT (APR 1984) ......................................................................................................................... 3 E.2 ACCEPTANCE (MAY 1997) .......................................................................................... 4 Section E - Page 1 of 4 DE-AC05-06OR23100 Blank Page Section E - Page 2 of 4 DE-AC05-06OR23100 PART I - SCHEDULE SECTION E INSPECTION AND ACCEPTANCE E.1 52.246-5

  16. PERT Peer Review Schedule Review Site Los Alamos National Lab

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PERT Peer Review Schedule Review Site Los Alamos National Lab Argonne National Lab Strategic Petroleum Reserve Princeton Plasma Physics Lab Dates January 26-31,2015 June 22-26, 2015 July 13-17, 2015 August 17-21, 2015 Team Lead Michelle Wiest John Roybal Vicki Worthington Sergio Martinez Team Members Al Garcia Linda Jones Laura Justice Anthony Guadagni Karen Lingua Kevin Heaton Andrea Spiker Patrick Schurott Anne Howe Daniel Saiz Patrick Padilla Carolyn Lucas NNSA Contractor (TBD) Jan Frensdorf

  17. ARM Intensive Operational Period Scheduled to Validate New NASA Satellite

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 ARM Intensive Operational Period Scheduled to Validate New NASA Satellite Beginning in July, all three ARM sites (Southern Great Plains [SGP], North Slope of Alaska, and Tropical Western Pacific; Figure 1) will participate in the AIRS Validation IOP. This three-month intensive operational period (IOP) will validate data collected by the satellite-based Atmospheric Infrared Sounder (AIRS) recently launched into space. On May 4, the National Aeronautics and Space Administration (NASA) launched

  18. ARM Mobile Facility - Design and Schedule for Integration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mobile Facility - Design and Schedule for Integration K. B. Widener Pacific Northwest National Laboratory Richland, Washington Abstract The Atmospheric Radiation Measurement (ARM) Program has a need for an ARM Mobile Facility (AMF) that can be deployed anywhere in the world for up to 12 months at a time. This system shall be modular so that it can meet the needs of ARM science objectives of each individual deployment. The design phase for developing the AMF has begun. A design review was held

  19. ADMINISTRATIVE RECORDS SCHEDULE 5: BUDGET PREPARATION, PRESENTATION, AND

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    APPORTIONMENT | Department of Energy 5: BUDGET PREPARATION, PRESENTATION, AND APPORTIONMENT ADMINISTRATIVE RECORDS SCHEDULE 5: BUDGET PREPARATION, PRESENTATION, AND APPORTIONMENT Budget and apportionment records include the various files accumulated in the course of formulating the budget for submission to the Office of Management and Budget (OMB) and to the Congress; in defending its requests for funds before both bodies; and after enactment of an appropriation bill, in ensuring that the

  20. The Phylogenetic Signature Underlying ATP Synthase c-Ring Compliance

    SciTech Connect (OSTI)

    Pandini, Alessandro; Kleinjung, Jens; Taylor, Willie R.; Junge, Wolfgang; Khan, Shahid

    2015-09-01

    The proton-driven ATP synthase (FOF1) is comprised of two rotary, stepping motors (FO and F1) coupled by an elastic power transmission. The elastic compliance resides in the rotor module that includes the membrane-embedded FO c-ring. Proton transport by FO is firmly coupled to the rotation of the c-ring relative to other FO subunits (ab2). It drives ATP synthesis. We used a computational method to investigate the contribution of the c-ring to the total elastic compliance. We performed principal component analysis of conformational ensembles built using distance constraints from the bovine mitochondrial c-ring x-ray structure. Angular rotary twist, the dominant ring motion, was estimated to show that the c-ring accounted in part for the measured compliance. Ring rotation was entrained to rotation of the external helix within each hairpin-shaped c-subunit in the ring. Ensembles of monomer and dimers extracted from complete c-rings showed that the coupling between collective ring and the individual subunit motions was independent of the size of the c-ring, which varies between organisms. Molecular determinants were identified by covariance analysis of residue coevolution and structural-alphabet-based local dynamics correlations. The residue coevolution gave a readout of subunit architecture. The dynamic couplings revealed that the hinge for both ring and subunit helix rotations was constructed from the proton-binding site and the adjacent glycine motif (IB-GGGG) in the midmembrane plane. IB-GGGG motifs were linked by long-range couplings across the ring, while intrasubunit couplings connected the motif to the conserved cytoplasmic loop and adjacent segments. The correlation with principal collective motions shows that the couplings underlie both ring rotary and bending motions. Noncontact couplings between IB-GGGG motifs matched the coevolution signal as well as contact couplings. The residue coevolution reflects the physiological importance of the dynamics that may link proton transfer to ring compliance.