Powered by Deep Web Technologies
Note: This page contains sample records for the topic "right-of-way access roads" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

GRR/Section 3-FD-c - Right-of-Way Access | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 3-FD-c - Right-of-Way Access GRR/Section 3-FD-c - Right-of-Way Access < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-FD-c - Right-of-Way Access 03FDCRightOfWayROWAccess (2).pdf Click to View Fullscreen Contact Agencies Bureau of Land Management United States Forest Service United States Department of Transportation National Telecommunications and Information Administration Regulations & Policies NEPA Triggers None specified Click "Edit With Form" above to add content 03FDCRightOfWayROWAccess (2).pdf 03FDCRightOfWayROWAccess (2).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative This flow chart is intended to apply to lands on which a lease has not been

2

NEPA REVIEW LASO-10-002 CATEGORICAL EXCLUSION PAJARITO ROAD RIGHT-OF-WAY SHIFT AT TA-50 AND TA-55  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REVIEW REVIEW LASO-10-002 CATEGORICAL EXCLUSION PAJARITO ROAD RIGHT-OF-WAY SHIFT AT TA-50 AND TA-55 1. DESCRIPTION OF PROPOSED ACTION: LANL proposes to shift a segment of Pajarito Road slightly to the south along the edge of Two-Mile Canyon in the vicinity of TA-55. The existing centerline would be moved between 36 feet and 56 feet depending on final designs. This shift would address the need to integrate security requirements related to the Chemistry and Metallurgy Building Replacement Project (CMRR) and the Nuclear Materials Safeguards and Security Upgrades Project (NMSSIJP) - specifically placement of the Perimeter Intrusion Detection, Assessment, and Delay System fence improvements in proximity to Pajarito Road. Pajarito Road is not open to the public and is secured to preclude unauthorized access to the facilities between

3

Transmission Right Of Way  

NLE Websites -- All DOE Office Websites (Extended Search)

About SNR > Right Of Way About SNR > Right Of Way Right Of Way Preferred Vegetation List - Redding & Foothills (XLS - 23K) Preferred Vegetation List - Sacramento Valley (XLS - 170K) WESTERN AREA POWER ADMINISTRATION GENERAL GUIDELINES CONCERNING THE USE OF ELECTRIC TRANSMISSION LINE RIGHTS-OF-WAY Western Area Power Administration (Western) owns a right-of-way easement along the length of the transmission line (width varies by transmission line). Western's rights within the easement include the right to construct, reconstruct, operate, maintain, and patrol the transmission line. Rights usually reserved to the landowner include the right to cultivate, occupy, and use the land for any purpose that does not conflict with Western's use of its easement. To avoid potential conflicts, it is Western's policy to review all proposed uses within the transmission line easement. We consider (1) Safety of the public, (2) Safety of our Employees, (3) Restrictions covered in the easement, (4) Western's maintenance requirements, and (5) Protection of the transmission line structures and (6) Road or street crossings.

4

EA-1697: San Joaquin Valley Right-of-Way Project, California | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

97: San Joaquin Valley Right-of-Way Project, California 97: San Joaquin Valley Right-of-Way Project, California EA-1697: San Joaquin Valley Right-of-Way Project, California Summary DOE's Western Area Power Administration is preparing this EA to evaluate the environmental impacts of right-of-way maintenance (including facility inspection and repair, vegetation management, and equipment upgrades for transmission lines and associated rights-or-way, access roads, substations, and a maintenance facility) in the San Joaquin Valley in California. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download December 2, 2011 EA-1697: Finding of No Significant Impact Right-of-Way Maintenance in the San Joaquin Valley, California December 2, 2011 EA-1697: Final Environmental Assessment

5

Microsoft Word - CX-Ross-Lexington_access_road_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Darin Bowman Darin Bowman Project Manager - TELF-TPP-3 Proposed Action: Access road repair including reconstructing, grading, and shaping of roads, placing and compacting of rock surfacing, installation of gates, installation and maintenance of erosion control and water drainage features, and restoration of disturbed areas. Budget Information: Work Order # 00259661 PP&A Project No.: 1738 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities...for...rights-of-way, infrastructures (e.g.. roads)...routine maintenance activities, corrective...are required to maintain and preserve infrastructures...in a condition suitable for the facility to be used for its designated purpose. Location: The project area is a Bonneville Power Administration (BPA) access road located on

6

Categorical Exclusion for Access Road  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Access Road Access Road Improvements along the Pinnacle Peak- Prescott 230-kV Transmission Line between Structures 16813 and 170/1 Yavapai County. Arizona * RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to improve access roads along a portion of the Pinnacle Peak to Prescott 230-kV Transmission Line (Structures 168/3 and 170/1). which are currently impassable. to maintain worker safety and the reliability of the bulk electric system. Western plans to blade and grade the existing access road where it enters and leaves three washes so that Western's maintenance vehicles can drive across the washes. We will remove dirt from the road prism by starting at wash edges and pulling dirt up slope in order to create ramps with grades suitable for our equipment.

7

Microsoft Word - CX-Boyer-Tillamook_access_road_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

James Semrau Project Manager - TELF-TPP-3 David Forward TELF-TPP-3 Proposed Action: Boyer-Tillamook No. 1 transmission line access road maintenance including grading and rocking of road surfaces and installation of water bars and cross drain culverts Budget Information: Work Order #00253279 PP&A Project No.: PP&A 1533 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities...for...rights-of-way...(e.g. roads)...required to maintain and preserve...infrastructures in a condition suitable for a facility to be used for its designated purpose. Location: Tillamook and Yamhill counties, Oregon. Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action:

8

Microsoft Word - CX-Ostrander-Troutdale-access_road_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 30, 2010 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Rick Ross Project Manager - TELF-TPP-3 Proposed Action: Ostrander-Troutdale No. 1 transmission line access road maintenance including grading and rocking of road surfaces and installation of water bars and cross drain culverts Budget Information: Work Order #: Unavailable PP&A Project No.: PP&A #1740 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities for rights-of-way, infrastructures (e.g. roads) routine maintenance activities corrective are required to maintain and preserve infrastructures in a condition suitable for the facility to be used for its designed purpose. Location: The proposed project is located within the Bonneville Power Administration (BPA)

9

Microsoft Word - CX-Cardwell-Cowlitz2011AccessRoad_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KEP-4 KEP-4 SUBJECT: Environmental Clearance Memorandum Rick Ross Project Manager - TELF-TPP-3 Proposed Action: Access road maintenance on or leading to the Cardwell-Cowlitz No.1, 115-kilovolt (kV) transmission line. Budget Information: Work Order #00281014 PP&A Project No.: 2020 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities... for...rights-of-way, infrastructures (e.g.. roads)... routine maintenance activities, corrective...are required to maintain and preserve infrastructures...in a condition suitable for the facility to be used for its designated purpose. Location: The project area consists of Bonneville Power Administration (BPA) access roads located on or leading to the Cardwell-Cowlitz No. 1, 115-kV transmission line right-of-way.

10

Gas Companies Right-of-Way (Maryland) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Gas Companies Right-of-Way (Maryland) Gas Companies Right-of-Way (Maryland) Eligibility Commercial Industrial Utility Program Information Maryland Program Type Siting and...

11

Application & Checklist for Highway Right of Way Lease | Open...  

Open Energy Info (EERE)

& Checklist for Highway Right of Way Lease Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Reference Material: Application and Checklist for Highway Right of Way Lease...

12

Microsoft Word - CX-Marion-AlveyMarion-LaneAccessRoad_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REPLY TO ATTN OF: KEP-Alvey SUBJECT: Environmental Clearance Memorandum Darin Bowman Manuel Campos Civil Engineer - TELF-TPP-3 Civil Engineer - TELF-TPP-3 Proposed Action: Access road improvements along portions of the Marion-Alvey #1 and Marion-Lane #1 transmission line rights-of-way. PP&A Project No: 1961 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities...for structures, rights of way, infrastructures such as roads, equipment... routine maintenance activities, corrective....are required to maintain...infrastructures...in a condition suitable for a facility to be used for its designed purpose. Location: The project area is located in Marion and Linn counties, Oregon, in Bonneville

13

Microsoft Word - CX-Ross-Lexington_access_road_addition_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KEPR-4 KEPR-4 SUBJECT: Environmental Clearance Memorandum Dawneen Dostert Project Manager - TERR-LMT Proposed Action: New access road construction to include clearing, grading, and shaping of roads, placing and compacting of rock surfacing, installation of gates, installation and maintenance of erosion control and water drainage features, and restoration of disturbed areas Budget Information: Work Order # 00230995 PP&A Project No.: 1534 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.13 Construction/ acquisition/relocation of onsite pathways, short onsite access roads/railroads. Location: The project area is confined to the existing and proposed access roads around the right-of-way (ROW) corridor of Bonneville Power Administration's (BPA) Ross-Lexington

14

Microsoft Word - CX-McNary-SantiamAccessRoad_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

James Semrau Project Manager - TELF-TPP-3 Proposed Action: Access road maintenance along the McNary-Santiam 230-kV and Jones Canyon-Santiam 230-kV transmission line corridors. Budget Information: WO #00292092 PP&A Project No.: 2044 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities... for...rights-of-way, infrastructures (e.g.. roads)... routine maintenance activities, corrective...are required to maintain and preserve infrastructures...in a condition suitable for the facility to be used for its designated purpose. Location: The project area consists of Bonneville Power Administration (BPA) access roads located on the McNary-Santiam (structure 123/1) & Jones Canyon-Santiam (structure 75/1)

15

Guidelines for Leasing State Highway Right of Way Tracts | Open...  

Open Energy Info (EERE)

Search Page Edit with form History Facebook icon Twitter icon Guidelines for Leasing State Highway Right of Way Tracts Jump to: navigation, search GEOTHERMAL ENERGYGeothermal...

16

Waiver of Preferential Right to Lease Highway Right of Way |...  

Open Energy Info (EERE)

Waiver of Preferential Right to Lease Highway Right of Way Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Reference Material: Waiver of Preferential Right to Lease...

17

Engineering the Multiple Use of the Right of Way  

Science Conference Proceedings (OSTI)

Transmission line owners and operators are under increasing pressure to share the use of their rights-of-way with other systems and for other activities. The objective of the "Engineering the Multiple Use of the Right of Way" project is to develop a guide for the design and maintenance of transmission lines so that the systems can operate reliably and activities can be carried out safety on these shared rights-of-way. It is a multi-year project conducted from 2004 to 2007. The first task of the project ...

2006-11-13T23:59:59.000Z

18

Right-of-Way for Carrier Facilities (South Dakota)  

Energy.gov (U.S. Department of Energy (DOE))

This legislation establishes right-of-way for carrier pipelines, as well as restrictions on the width of lands used for pipeline facilities. This legislation also applies to electricity...

19

Electric Transmission Rights-of-Way Uses and Risks  

Science Conference Proceedings (OSTI)

Significant societal and economic benefits accrue through multiple uses of electric transmission rights-of-way (ROWs). Authorization of multiple ROW uses, however, has the potential to be detrimental to the safe, reliable transmission of electricity. Understanding benefits and risks will help utilities evaluate the myriad of current and potential ROW uses, establish effective protocols, and identify the best opportunities for expanding ROW uses.

2004-12-15T23:59:59.000Z

20

Wetland and Conservation Banking in Transmission Corridor Rights-of-Way: Feasibility Assessment  

Science Conference Proceedings (OSTI)

Electric power transmission corridor rights-of-way (ROWs) offer potential locations for wetland mitigation banks and conservation banks. Barriers to use of these ROWs for banking include whether the ROW operator has legal rights of access to lands for these uses and for long term management for conservation; the need to assure successful and reliable operation and maintenance of the ROW transmission facilities; the costs of establishing, permitting and managing wetland and conservation banks; and ecologi...

2008-12-10T23:59:59.000Z

Note: This page contains sample records for the topic "right-of-way access roads" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Electric Transmission Right-of-Way Invasive Non-Native Woody Plant Species Control  

Science Conference Proceedings (OSTI)

Invasive non-native woody plant species are a significant issue in the United States. Invasive woody plants are a particular concern for electric transmission right-of-way (ROW) managers. While invasive non-native woody plants have beneficial usesincluding erosion control, wildlife food and cover, and use as ornamentalsthey also have a notably negative impact on electric transmission ROWs. Negative impacts include reducing line clearance, reliability, and accessibility, and increasing vegetation manageme...

2006-03-27T23:59:59.000Z

22

Right-of-Way Treatment Cycles: Update 2000  

Science Conference Proceedings (OSTI)

The selection of right-of-way (ROW) vegetation treatment methods can greatly impact utility profits from distribution and transmission of electricity in a deregulated marketplace. This report evaluates the cost-effectiveness of seven vegetation management methods -- hand cutting, mowing, cut and stump, dormant basal, summer basal, selective ground foliar, and aerial -- on 18 transmission powerline corridors across New York State. The third part of a six-year study, this report summarizes data collected i...

2000-10-25T23:59:59.000Z

23

Long-Term Right-of-Way Effectiveness: Update 2000  

Science Conference Proceedings (OSTI)

In very fundamental ways, utility profits from distribution and transmission of electricity in a deregulated marketplace are linked to their right-of-way (ROW) management approaches. This report evaluates the cost-effectiveness of seven vegetation management methods -- hand cutting, mowing, cut and stump, dormant basal, summer basal, selective ground foliar, and aerial -- on 18 transmission powerline corridors across New York State. The second part of a six-year study, this report evaluates the treatment...

2000-10-25T23:59:59.000Z

24

Transmission Rights-of-Way Vegetation Management Plan Framework  

Science Conference Proceedings (OSTI)

The North American Electric Reliability Corporation (NERC) FAC-003-1 standards for vegetation management on electric transmission line rights-of-way (ROWs) have been in place since April 2006. These mandatory standards regulate electric transmission line vegetation management across the United States, and are narrowly focused on minimizing vegetation caused outages in electricity transmission. The NERC FAC-003-1 standards are potentially broadened by the voluntary American National Standards Institute (A...

2008-08-05T23:59:59.000Z

25

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Hygiene Substation Access Road Repairs  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hygiene Substation Access Road Repairs Hygiene Substation Access Road Repairs A. Brief Description of Proposal: Western Area Power Administration proposes to repair the access road/driveway into the Hygiene Substation. There is a low spot in the middle of the driveway that impedes maneuvering oflarge maintenance equipment in and out of the yard. Western plans to fill the low spot with road base and crumbled concrete fill. The Hygiene Substation is located in Boulder County, approximately 2 miles northwest of Longmont, CO (T3N, R69W, Sec 18). All proposed construction will occur within the existing, disturbed substation access road/driveway. B. Number and Title of tile Categorical Exclusion Being Applied: (See text in 10 CFR 1021, Subpart D.) BI.3 Routine maintenance activities and custodial services for buildings, structures,

26

GRR/Section 3-WA-e - State Right of Way Process | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 3-WA-e - State Right of Way Process GRR/Section 3-WA-e - State Right of Way Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-WA-e - State Right of Way Process 3-WA-e - State Right of Way Process.pdf Click to View Fullscreen Contact Agencies Washington State Department of Natural Resources Regulations & Policies RCW 79-36-350 RCW 79-36-520 RCW 79-36-530 Triggers None specified This flowchart illustrates the process for obtaining a right of way over state lands in Washington. The right of way process is overseen by the Washington State Department of Natural Resources (WSDNR). The right of way process is regulated under Revised Code of Washington (RCW) 79-36-350. The developer may apply for an easement, permit or license for a right of

27

Using Daylight to Light the Access Zone of Road Tunnels  

NLE Websites -- All DOE Office Websites (Extended Search)

Using Daylight to Light the Access Zone of Road Tunnels Using Daylight to Light the Access Zone of Road Tunnels Speaker(s): Eliyahu Ne'eman Date: March 4, 2003 - 12:00pm Location: Bldg. 90 Lighting guides for roadway tunnels specify relatively high luminances for the "access zone" into the tunnel. They are needed to allow the eyes of the driver sufficient time to adapt during the short period of the transition from the outdoor natural daylight levels to the fairly low luminances along the main length of the tunnel. Usually, the necessary high luminances are provided by rows of costly luminaries which consume a lot of electricity during peak use periods and need a good deal of maintenance. To save some electric power, controls are used to dim the lighting on cloudy hours. Daylight has been used for the access zone in several tunnels around the

28

GRR/Section 3-AK-b - Right of Ways (ROWs) | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 3-AK-b - Right of Ways (ROWs) GRR/Section 3-AK-b - Right of Ways (ROWs) < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-AK-b - Right of Ways (ROWs) 03AKBRightOfWaysROWs.pdf Click to View Fullscreen Contact Agencies Alaska Department of Natural Resources Alaska Division of Mining Land and Water Regulations & Policies Alaska Statutes Alaska Administrative Code Triggers None specified Click "Edit With Form" above to add content 03AKBRightOfWaysROWs.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Alaska Division of Mining Land and Water (ML&W) oversees land use within the state and issues right of ways, easements or permit to use state

29

Report to Congress: Corridors and Rights-of-Way on Federal Lands...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Corridors and Rights-of-Way on Federal Lands Authority to grant, issue, or renew electric transmission ROWs on Federal land is held by the Forest Service (FS) of the U.S....

30

Transmission Right-of-Way Steward Accreditation Pilot Audit Report: Arizona Public Service  

Science Conference Proceedings (OSTI)

This report presents the findings of an independent audit conducted by specialists representing the Right-of-Way (ROW) Steward Program. The purpose of the audit was to evaluate the environmental, economic, and social aspects—the sustainability—of Arizona Public Service’s (APS’s) electric transmission line right-of-way vegetation management and to determine gaps in its sustainable conduct of integrated vegetation management.Integrated vegetation management, or IVM, ...

2013-10-29T23:59:59.000Z

31

Rights-Of-Way (ROW) Environmental Management: New ROW Development and Existing ROW Maintenance  

Science Conference Proceedings (OSTI)

During October 27-29, 1997, the Electric Power Research Institute (EPRI) and the Empire State Electric Energy Research Corporation (ESEERCO) sponsored a workshop to assess the need for a program of environmental research on Rights-of-Way (ROW) development and management, and to develop a research agenda. The workshop built on 1993 and 1996 EPRI meetings, and on the 6th International Symposium on Environmental Concerns in Rights-of-Way Management held in February, 1997. This document presents the proceedi...

1999-12-15T23:59:59.000Z

32

Rights-of-Way Stability: A 15-year Appraisal of Plant Dynamics on Electric Power Rights-of-Way in New York State  

Science Conference Proceedings (OSTI)

Operational, selective removal of trees on rights-of-way (ROWs) can create relatively stable, compositionally constant low-density tree populations. This report presents the results of studies on 21 electric transmission line ROWs in New York State. The results show that selective vegetation management of undesirable species, an ecologically based management technique, helps promote or maintain plant species richness and diversity on upland landscapes, but appears to have no effect in wetlands. In additi...

1999-09-16T23:59:59.000Z

33

GRR/Section 3-TX-c - Highway Right of Way Lease | Open Energy Information  

Open Energy Info (EERE)

3-TX-c - Highway Right of Way Lease 3-TX-c - Highway Right of Way Lease < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-TX-c - Highway Right of Way Lease 03TXCEncroachmentIssues.pdf Click to View Fullscreen Contact Agencies Texas General Land Office Texas Department of Transportation Regulations & Policies 43 TAC 21.600 43 TAC 21.603 43 TAC 21.606 Triggers None specified Click "Edit With Form" above to add content 03TXCEncroachmentIssues.pdf 03TXCEncroachmentIssues.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative This flowchart illustrates the procedure for obtaining a state highway asset lease in Texas. The Texas Department of Transportation (TxDOT) may lease any highway asset.

34

Power Districts: Acquisition of Right-of-Way (Nebraska) | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Districts: Acquisition of Right-of-Way (Nebraska) Districts: Acquisition of Right-of-Way (Nebraska) Power Districts: Acquisition of Right-of-Way (Nebraska) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Nebraska Program Type Line Extension Analysis Provider Nebraska Public Power District This statute describes procedures for power districts (utilities,

35

GRR/Section 3-MT-f - Right-of-Way Easement for Utilities | Open Energy  

Open Energy Info (EERE)

3-MT-f - Right-of-Way Easement for Utilities 3-MT-f - Right-of-Way Easement for Utilities < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-MT-f - Right-of-Way Easement for Utilities 03MTFRightOfWayEasementForUtilitiesProcess.pdf Click to View Fullscreen Contact Agencies Montana Department of Natural Resources & Conservation Montana State Historic Preservation Office Triggers None specified Click "Edit With Form" above to add content 03MTFRightOfWayEasementForUtilitiesProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative This flowchart is intended to describe the process for obtaining an

36

EA-0904: Access Road from State Route 240 to the 200 West Area Hanford  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Access Road from State Route 240 to the 200 West Area 4: Access Road from State Route 240 to the 200 West Area Hanford Site, Richland, Washington EA-0904: Access Road from State Route 240 to the 200 West Area Hanford Site, Richland, Washington SUMMARY This EA evaluates the environmental impacts of a proposal to construct an access road on the U.S. Department of Energy's Hanford Site in Richland, Washington, from State Route 240 to Beloit Avenue in the 200 West Area. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD March 10, 1994 EA-0904: Finding of No Significant Impact Access Road from State Route 240 to the 200 West Area Hanford Site, Richland, Washington March 10, 1994 EA-0904: Final Environmental Assessment Access Road from State Route 240 to the 200 West Area Hanford Site,

37

Corridors and Connectivity of Rights-of-Way: State of the Science  

Science Conference Proceedings (OSTI)

This report considers the topic of invasive species as it relates to power line and other rights-of-way. It presents a synopsis of the current state of the science, which is drawn from a review of the published, peer-reviewed scientific research on the subject. Information is supplemented with commentary from scientists, policymakers, and utility experts.

2008-08-14T23:59:59.000Z

38

ROW 2.0 - Right-of-Way Environmental Stewardship Bibliographic Database, Version 2.0  

Science Conference Proceedings (OSTI)

The Right-of-Way Environmental Stewardship Bibliographic Database Version 2.0 (ROW 2.0) allows users to search in multiple ways for citations and retrieve summaries of published documents that focus on environmental concerns related to utility corridor design, siting, construction, or management.

2007-03-08T23:59:59.000Z

39

Microsoft Word - Class 1 S Access Road-031611 FINAL.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

1 Permit Modification Notification to: * Add South Access Road for Transportation of TRU Mixed Waste We certify under penalty of law that this document and the enclosure were...

40

Human Health Risk Assessment of Chemicals Encountered in Vegetation Management on Electric Utility Rights-of-Way  

Science Conference Proceedings (OSTI)

This report discusses the human health risk assessment of chemicals encountered in vegetation management on electric utility rights-of-way (ROWs).

2003-12-03T23:59:59.000Z

Note: This page contains sample records for the topic "right-of-way access roads" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Management of Riparian Areas on Electric Transmission Line Rights-of-Way  

Science Conference Proceedings (OSTI)

Electric transmission line rights-of-way (ROWs) commonly cross streams, rivers, ponds, and lakes. Plant communities along the edges of these water resources are important because of their role in soil conservation and habitat diversity as well as the influence they have on fauna and aquatic ecosystems. The area of vegetation affected by the water-based habitatand that in turn affects the wateris the riparian area. This report provides guidance on the definition and management considerations for riparian ...

2011-12-14T23:59:59.000Z

42

Conservation and Wetland Banking Opportunities Within Transmission Rights-of-Way.  

Science Conference Proceedings (OSTI)

Electric transmission line rights-of-way (ROWs) encompass millions of acres. Some of these lands include aquatic resources and land suitable for threatened or endangered species habitat. Wetland mitigation banking and habitat conservation banking provide legally recognized ways to offset permitted impacts to aquatic resources and wildlife by providing compensatory mitigation "credits" generated by conservation activities. Because ROW corridor lands traverse a variety of aquatic resources and habitats, an...

2008-12-18T23:59:59.000Z

43

Storm Water Best Management Practices Manual for Transmission Line Rights-of-Way Construction and Maintenance  

Science Conference Proceedings (OSTI)

The U.S. Environmental Protection Agency (EPA) has proposed a general construction storm water permit that would require implementation of best management practices (BMPs) to meet a specific nephelometric turbidity unit (NTU) and total suspended solids (TSS) limit as well as additional erosion and sediment control requirements from construction sites. These new requirements will provide unique challenges for those designing, constructing, and maintaining transmission line rights-of-way (ROWs). This techn...

2011-12-30T23:59:59.000Z

44

Guide to Engineering the Multiple Use of the Right of Way  

Science Conference Proceedings (OSTI)

Transmission line owners are under increasing pressure to allow other systems, structures, and activities to share the right of way. Other systems include distribution lines, railroads, pipelines, fiber optic repeaters, cell phone repeaters, and communication systems. Structures include permanent and temporary buildings and fixtures, parking lots, tennis courts, baseball diamonds, and driving ranges. Activities include recreational, commercial, and farming operations. The effect of the transmission lines...

2007-11-05T23:59:59.000Z

45

New Applications of Transformerless Voltage Sourced Converters (VSC): Phase Displacement for Upgrading Rights-of-Way  

Science Conference Proceedings (OSTI)

New overhead transmission lines, steady expansion of electric power systems, and reallocation of generation all make it increasingly important to maximize the use of existing rights-of-way (ROWs) in order to increase power transfer capability. It is extremely difficult and costly, however, to remove critical circuits from service long enough to reconductor or replace old circuits with new higher capacity circuits using the same ROW. This report describes new means to allow either type of upgrade ...

2013-06-28T23:59:59.000Z

46

Cost Comparison of Rights-of-Way Treatment Methods: Update 2000  

Science Conference Proceedings (OSTI)

For many utilities in a deregulated marketplace, distribution and transmission of electricity has become their core business. This shift has dramatically increased interest in the siting and right-of-way (ROW) management of electric transmission lines. This report evaluates the cost-effectiveness of seven vegetation management methods -- hand cutting, mowing, cut and stump, dormant basal, summer basal, selective ground foliar, and aerial -- on 18 transmission powerline corridors across New York State.

2000-09-21T23:59:59.000Z

47

Vegetation Management in Electric Transmission Rights-of-Way and Potential Impacts on Groundwater  

Science Conference Proceedings (OSTI)

Chemical contamination of ground water is a growing utility concern. Pesticides and other potentially hazardous chemicals are used ubiquitously in everyday life. Pesticide use is widespread in urban, industrial, and agricultural settings, and in the case of utility rights-of-way (ROWs), is applied in a linear fashion across the landscape, often over long distances and intermingled with other uses. Thus, reliable assessment of risks arising from pesticide contamination of ground water and design of effici...

2010-11-30T23:59:59.000Z

48

Best Management Practices (BMPs) Manual for Access Road Crossings of Wetlands and Waterbodies  

Science Conference Proceedings (OSTI)

This manual addresses the selection and use of best management practices (BMPs) for the construction and/or maintenance of wetland and waterbody crossings by access roads associated with electric utility lines. Although the focus of this manual is on electric utility access roads, the contents are likely to be applicable to a much broader range of linear projects, including other types of roads and projects.

2002-03-22T23:59:59.000Z

49

Detection of Unauthorized Construction Equipment in Pipeline Right-of-Ways  

Science Conference Proceedings (OSTI)

The leading cause of incidents on transmission pipelines is damage by third-party construction equipment. A single incident can be devastating, causing death and millions of dollars of property loss. This damage would be prevented if potentially hazardous construction equipment could be detected, identified, and an alert given before the pipeline is hit. Currently there is no method for continuously monitoring a pipeline right-of-way. Instead, companies periodically walk or fly over the pipeline to find unauthorized construction activities. Gas Technology Institute (GTI) is developing a system to solve this problem by using an optical fiber buried above the pipeline as a distributed sensor. A custom optical time domain reflectometer (OTDR) is used to interrogate the fiber. Key issues in the development of this technology are the ability to detect encroachment and the ability to discriminate among potentially hazardous and benign encroachments. Advantages of the reflectometry technique are the ability to accurately pinpoint the location of the construction activity and the ability to separately monitor simultaneously occurring events. The basic concept of using OTDR with an optical fiber buried above the pipeline to detect encroachment of construction equipment into the right of way works. Sufficiently rapid time response is possible; permitting discrimination between encroachment types. Additional work is required to improve the system into a practical device.

Maurice Givens; James E. Huebler

2004-09-30T23:59:59.000Z

50

Energy Policy Act of 2005, Section 1813, Indian Land Rights-of-Way Study, Report to Congress  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Policy Act of 2005, Section 1813 Policy Act of 2005, Section 1813 Indian Land Rights-of-Way Study Report to Congress May 2007 U.S. Department of Energy U.S. Department of the Interior REPORT TO CONGRESS ENERGY POLICY ACT OF 2005, SECTION 1813 INDIAN LAND RIGHTS-OF-WAY STUDY U.S. Department of Energy U.S. Department of the Interior May 2007 Report to Congress: EPAct 2005, Section 1813, Indian Land Rights-of-Way Study i Contents Notation........................................................................................................................................... v Executive Summary ...................................................................................................................... vii 1. Introduction .............................................................................................................................

51

Microsoft Word - CX-Hillscreek-LookoutPoint_AccessRoad_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nick Wenzl Line Foreman I - TFE-Alvey Line Foreman III - TFE-Alvey Proposed Action: Wood pole replacement and minor access road maintenance along portions of the Hills...

52

Survey of Electric and Gas Rights-of-Way Practitioners: Current Practices and Views of Future Transmission Line Siting Issues  

Science Conference Proceedings (OSTI)

The adequacy of the nation's power grid is a topic of great concern, particularly the extent of new construction and upgrades required over the next decade to meet increasing energy demand. This report compiles the survey responses of energy company professionals associated with the task of developing rights-of-way. Respondents provided information on current industry practices, as well as the social and regulatory environment in which they operate to secure rights-of-way for new transmission lines and u...

2003-12-04T23:59:59.000Z

53

DETECTION OF UNAUTHORIZED CONSTRUCTION EQUIPMENT IN PIPELINE RIGHT-OF-WAYS  

Science Conference Proceedings (OSTI)

Natural gas transmission companies mark the right-of-way areas where pipelines are buried with warning signs to prevent accidental third-party damage. Nevertheless, pipelines are sometimes damaged by third-party construction equipment. A single incident can be devastating, causing death and millions of dollars of property loss. This damage would be prevented if potentially hazardous construction equipment could be detected, identified, and an alert given before the pipeline was damaged. The Gas Technology Institute (GTI) is developing a system to solve this problem by using an optical fiber as a distributed sensor and interrogating the fiber with an custom optical time domain reflectometer. Key issues are the ability to detect encroachment and the ability to discriminate among potentially hazardous and benign encroachments. The work performed in the third quarter of the project (2nd quarter of 2002) includes design of the diode laser driver and high-speed detector electronics and programming of the custom optical time domain reflectometer.

James E. Huebler

2002-07-19T23:59:59.000Z

54

DETECTION OF UNAUTHORIZED CONSTRUCTION EQUIPMENT IN PIPELINE RIGHT-OF-WAYS  

SciTech Connect

Natural gas transmission companies mark the right-of-way areas where pipelines are buried with warning signs to prevent accidental third-party damage. Nevertheless, pipelines are sometimes damaged by third-party construction equipment. A single incident can be devastating, causing death and millions of dollars of property loss. This damage would be prevented if potentially hazardous construction equipment could be detected, identified, and an alert given before the pipeline was damaged. The Gas Technology Institute (GTI) is developing a system to solve this problem by using an optical fiber as a distributed sensor and interrogating the fiber with a custom optical time domain reflectometer. Key issues are the ability to detect encroachment and the ability to discriminate among potentially hazardous and benign encroachments. The work performed in the third quarter of the project (2nd quarter of 2002) includes design and construction of the diode laser driver and high-speed detector electronics. Fine-tuning of the electronics is proceeding. A new test site along an operating pipeline has been obtained.

James E. Huebler

2002-10-30T23:59:59.000Z

55

DETECTION OF UNAUTHORIZED CONSTRUCTION EQUIPMENT IN PIPELINE RIGHT-OF-WAYS  

Science Conference Proceedings (OSTI)

Natural gas transmission companies mark the right-of-way areas where pipelines are buried with warning signs to prevent accidental third-party damage. Nevertheless, pipelines are sometimes damaged by third-party construction equipment. A single incident can be devastating, causing death and millions of dollars of property loss. This damage would be prevented if potentially hazardous construction equipment could be detected, identified, and an alert given before the pipeline was damaged. The Gas Technology Institute (GTI) is developing a system to solve this problem by using an optical fiber as a distributed sensor and interrogating the fiber with a custom optical time domain reflectometer. Key issues are the ability to detect encroachment and the ability to discriminate among potentially hazardous and benign encroachments. The work performed in the 1st quarter of 2003 included fine-tuning and debugging of the custom Optical Time Domain Reflectometer being constructed for data collection and analysis. The detector was redesigned reducing the noise floor by over a factor of ten. While GTI's OTDR was being improved, a new, commercial OTDR was used to verify that the technique is capable of measuring one pound continuous force applied to the Hergalite. Optical fibers were installed at the ANR Pipeline test site along an operating pipeline.

James E. Huebler

2003-04-17T23:59:59.000Z

56

DETECTION OF UNAUTHORIZED CONSTRUCTION EQUIPMENT IN PIPELINE RIGHT-OF-WAYS  

SciTech Connect

Natural gas transmission companies mark the right-of-way areas where pipelines are buried with warning signs to prevent accidental third-party damage. Nevertheless, pipelines are sometimes damaged by third-party construction equipment. A single incident can be devastating, causing death and millions of dollars of property loss. This damage would be prevented if potentially hazardous construction equipment could be detected, identified, and an alert given before the pipeline was damaged. The Gas Technology Institute (GTI) is developing a system to solve this problem by using an optical fiber as a distributed sensor and interrogating the fiber with a custom optical time domain reflectometer. Key issues are the ability to detect encroachment and the ability to discriminate among potentially hazardous and benign encroachments. The work continues on improving the signal-to-noise ratio of the technique. We are now able to detect weights sitting on the Hergalite fiber of as low as 0.2 pound. Detection of load fluctuations with frequencies greater than 1 Hertz is also possible. We have also purchased a brighter diode laser for use with the multimode fibers that should improve our sensitivity by a factor of ten.

James E. Huebler

2004-04-12T23:59:59.000Z

57

DETECTION OF UNAUTHORIZED CONSTRUCTION EQUIPMENT IN PIPELINE RIGHT-OF-WAYS  

Science Conference Proceedings (OSTI)

Natural gas transmission companies mark the right-of-way areas where pipelines are buried with warning signs to prevent accidental third-party damage. Nevertheless, pipelines are sometimes damaged by third-party construction equipment. A single incident can be devastating, causing death and millions of dollars of property loss. This damage would be prevented if potentially hazardous construction equipment could be detected, identified, and an alert given before the pipeline was damaged. The Gas Technology Institute (GTI) is developing a system to solve this problem by using an optical fiber as a distributed sensor and interrogating the fiber with a custom optical time domain reflectometer. Key issues are the ability to detect encroachment and the ability to discriminate among potentially hazardous and benign encroachments. The work performed in the 4th quarter of 2002 included fine-tuning and debugging of the custom Optical Time Domain Reflectometer being constructed for data collection and analysis. It also included installation of optical fibers at the test site along an operating pipeline.

James E. Huebler

2003-01-29T23:59:59.000Z

58

DETECTION OF UNAUTHORIZED CONSTRUCTION EQUIPMENT IN PIPELINE RIGHT-OF-WAYS  

SciTech Connect

Natural gas transmission companies mark the right-of-way areas where pipelines are buried with warning signs to prevent accidental third-party damage. Nevertheless, pipelines are sometimes damaged by third-party construction equipment. A single incident can be devastating, causing death and millions of dollars of property loss. This damage would be prevented if potentially hazardous construction equipment could be detected, identified, and an alert given before the pipeline was damaged. The Gas Technology Institute (GTI) is developing a system to solve this problem by using an optical fiber as a distributed sensor and interrogating the fiber with a custom optical time domain reflectometer. Key issues are the ability to detect encroachment and the ability to discriminate among potentially hazardous and benign encroachments. The work continues on improving the signal-to-noise ratio of the custom OTDR. An avalanche photo-detector, was purchased. It was able to detect weights on the Hergalite fiber as low as one pound. We are also investigating a brighter laser for use with the multimode fibers.

James E. Huebler

2003-07-17T23:59:59.000Z

59

Microsoft Word - CX-LowerGranite-HatwaiAccessRoadImprovementFY13_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2012 9, 2012 REPLY TO ATTN OF: KEPR-Bell-1 SUBJECT: Environmental Clearance Memorandum Kristi Unholz Project Manager - TELF-TPP-3 Proposed Action: Improve the access road system in miles 4, 5, 16, 17, 18, and 30 of the Lower Granite-Hatwai transmission line PP&A Project No.: 2378 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine Maintenance. B1.13 Pathways, short access roads, and rail lines Location: As identified in table below: Lower Granite-Hatwai Access Road Project Location Township Range Section County, State mile 4 to mile 5 13N 43E 2 Whitman, WA mile 16 12N 45E 8 mile 17 12N 45E 17 mile 18 12N 45E 20 mile 30 36N 5W 19, 30 Nez Perce, ID Proposed by: Bonneville Power Administration (BPA)

60

EA-1941: Boyer-Tillamook Access Road Improvement Project, Tillamook and Yamhill Counties, Oregon  

Energy.gov (U.S. Department of Energy (DOE))

Bonneville Power Administration (BPA) is preparing an EA to assess the potential environmental impacts of proposed improvements to 13 miles of access roads for its existing 115-kV Boyer-Tillamook No. 1 Transmission Line in Tillamook and Yamhill counties, Oregon. Associated activities would include resurfacing roads, adding drainage, widening 3 miles of road, constructing 0.1 mile of new road, maintaining culverts, and constructing outlet ditches and retaining walls. In addition, new bridges would be built, and culverts that currently block fish passage for anadromous and resident fish would be replaced. Additional information is available at the project website: http://efw.bpa.gov/environmental_services/Document_Library/Boyer-Tillamook/.

Note: This page contains sample records for the topic "right-of-way access roads" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

EA-1629: Herbicide Application within Transmission Line Rights-of-Way in the Ozark-St. Francis National Forest, Arkansas  

Energy.gov (U.S. Department of Energy (DOE))

The Department of the Interior, U.S. Forest Service, with DOE’s Southwestern Area Power Administration as a cooperating agency, is preparing this EA to evaluate the environmental impacts of applying herbicide within transmission line rights-of-way in the Ozark-St. Francis National Forest in Arkansas. NOTE: SWPA's involvement in this EA has ended.

62

Microsoft Word - CX-GarrisonSubstationAccessRoadImprovementFY13_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2013 8, 2013 REPLY TO ATTN OF: KEPR-Bell-1 SUBJECT: Environmental Clearance Memorandum Jonathan Malmberg Project Manager - TETQ-TPP-3 Proposed Action: Maintenance along sections of the access road leading to Bonneville Power Administration's (BPA) Garrison Substation PP&A Project No.: 2609 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine Maintenance. B1.13 Pathways, short access roads, and rail lines. Location: As identified in table below: Township Range Section County 9N 11W 14, 13, 24 Powell 9N 10W 19, 30, 20 Powell Proposed by: BPA Description of the Proposed Action: BPA proposes repairing a corrugated metal pipe end; making minor asphalt repairs; and grading, shaping, compacting, and placing road aggregate on 20,005 linear feet

63

Microsoft Word - CX-Kalispell-KerrMile15-16AccessRoadImprovementFY12_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 REPLY TO ATTN OF: KEPR-Bell-1 SUBJECT: Environmental Clearance Memorandum Joe Johnson Project Manager - TELF-TPP-3 Proposed Action: Access road improvement for the Kalispell-Kerr #1, 115-kilovolt (kV) transmission line PP&A Project No.: 2474 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine Maintenance, B1.13 Pathways, short access roads, and rail lines Location: Township 26 North, Range 21 West, Section 13 and 24, Flathead County, MT. Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to perform access road maintenance on several segments of the access road for the Kalispell-Kerr #1, 115-kV transmission line. Work includes reconstruction and drainage enhancements on 5000 feet of road beginning at structure

64

Cost-effectiveness of Different Herbicide and Non-herbicide Alternatives for Treating Transmission Rights of Way Vegetation  

Science Conference Proceedings (OSTI)

This report is a guide to using cost-effectiveness analysis to compare different programs of vegetation management for electric transmission line rights of way.BackgroundCost effectiveness is an important economic measure for describing and comparing the relative acceptability of different vegetation management programs. Cost-effectiveness analysis is apparently rarely used in the utility industry. This might be related to its apparent complexity, but it can ...

2012-12-12T23:59:59.000Z

65

Importance, Identification, and Assessment of Danger and Hazard Trees Located Outside Electric Transmission Line Rights-of-Way  

Science Conference Proceedings (OSTI)

Electric transmission line rights-of-way (ROWs) commonly pass through forested areas across North America. Trees from these forests could fall from outside the ROW into a transmission line and its security zone, potentially causing an outage. Most of the bulk transmission outages across the United States over the past decade have been caused by off-ROW trees. The North American Electric Reliability Corporation (NERC) developed standards for transmission vegetation management programs that strictly regul...

2010-11-22T23:59:59.000Z

66

Ecological and Wildlife Risk Assessment of Chemicals Encountered in Vegetation Management on Electric Utility Rights-of-Way  

Science Conference Proceedings (OSTI)

The management of vegetation on electric utility rights-of-way (ROWs) is an essential part of managing electrical transmission and distribution systems. A variety of manual, mechanical, and chemical methods, singly or in combination, are used for this purpose. The method or methods selected must be safe for humans and the environment and cost-effective in accomplishing the goals of ROW management. This report reviews environmental and wildlife safety through an assessment of risk to the environment, incl...

2004-12-27T23:59:59.000Z

67

Microsoft Word - CX-AccessRoads-KingCoWA-FY13_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

22, 2013 22, 2013 REPLY TO ATTN OF: KEPR-Covington SUBJECT: Environmental Clearance Memorandum Rick Ross Engineer - TELF-TPP-3 Proposed Action: Covington District Culvert Replacements Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): Appendix B1.3, Routine Maintenance Location: King County, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to replace existing culverts at 12 access road stream crossings that present barriers to fish passage. These improvements will be made on BPA easement access roads within DNR owned and managed lands. BPA will make these improvements by installing new fish friendly culverts and/or bridges at each stream crossing. The current stream crossings do not meet DNR fish passage standards that will be in

68

Draft Report to Congress: Energy Policy Act of 2005, Section 1813, Indian Land Rights-of-Way Study  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DRAFT REPORT TO CONGRESS: DRAFT REPORT TO CONGRESS: ENERGY POLICY ACT OF 2005, SECTION 1813, INDIAN LAND RIGHTS-OF-WAY STUDY U.S. Department of Energy U.S. Department of the Interior August 7, 2006 DRAFT August 7, 2006 DRAFT ii Contents 1. Introduction............................................................................................................................. 1 1.1. Statutory Language of Section 1813............................................................................... 1 1.2. Scope of Section 1813 .................................................................................................... 2 1.3. Issues Raised in Scoping the Study ................................................................................ 4 1.3.1. Tribal Sovereignty, Consent, and Self-Determination............................................

69

Microsoft Word - Class 1 S Access Road-031611 FINAL.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

Carlsbad. New Mexico 88221 Carlsbad. New Mexico 88221 Mr. James Bearzi, Chief Hazardous Waste Bureau New Mexico Environment Department 2905 Rodeo Park Drive East, Building 1 Santa Fe, New Mexico 87505-6303 MAR 1 7 2011 Subject: Notification of a Class 1 Permit Modification to the Hazardous Waste Facility Permit, Permit Number: NM4890139088· TSDF Dear Mr. Bearzi: Enclosed is a Class 1 Permit Modification Notification to: * Add South Access Road for Transportation of TRU Mixed Waste We certify under penalty of law that this document and the enclosure were prepared under our direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted . Based on our inquiry of the person or persons who manage the system, or those persons directly responsible for gathering

70

Vegetation Dynamics Along Utility Rights-of-Way Factors Affecting the Ability of Shrub and Herbaceous Communities to Resist Invasion by Trees  

Science Conference Proceedings (OSTI)

Traditional vegetation management programs along utility rights-of-way (ROW) have been designed to prevent tree growth into transmission wire security zones. This study of vegetation dynamics describes factors affecting the ability of shrub and herbaceous communities to resist tree invasion. Such information will allow ecologists to identify the critical pressure points where intervention in natural ecological processes will prove most effective.

1999-09-11T23:59:59.000Z

71

Development of a right-of-way cost estimation and cost estimate management process framework for highway projects  

E-Print Network (OSTI)

Escalation of right-of-way (ROW) costs have been shown to be a prime contributor to project cost escalation in the highway industry. Two problems contribute to ROW cost escalation: 1) the ROW cost estimation and cost estimate management process generally lacks structure and definition as compared to other areas of cost estimation; and 2) there is a lack of integration and communication between those responsible for ROW cost estimating and those responsible for general project cost estimating. The research for this thesis was preceded by a literature review to establish the basis for the study. Data collection was completed through interviews of seven state highway agencies (SHAs) and two local public agencies (LPAs). The findings of the research are presented in a set of ROW flowcharts which document the steps, inputs, and outputs of the ROW cost estimation and cost estimate management process. Three ROW cost estimates and a cost management process take place throughout project development. An effort was made from the onset of the research to relate the ROW cost estimating and cost estimate management process to the first four project development phases (planning, programming. preliminary design, and final design). There are five flowcharts produced as a result of this research: 1) an agency-level flowchart showing all cost estimates and the interaction of ROW with the project development process; 2) a conceptual ROW cost estimating flowchart which depicts the required steps during planning; 3) a baseline ROW cost estimating flowchart which depicts the required steps during programming; 4) an update ROW cost estimating flowchart which depicts the required steps during preliminary design to include a cost estimate management loop; and 5) a ROW cost management flowchart which depicts the required steps during final design. Although selected SHA contacts provided input following the development of the flowcharts, the flowcharts were only validated to a limited extent due to time and budget constraints. These flowcharts attempt to address the two contributing problems to ROW cost escalation by providing structure to the ROW cost estimation process and by developing the ROW process flowcharts linked to the project development process. Based on the input provided by SHA contacts, the flowcharts appear to have the potential to provide guidance to SHAs in improving the accuracy of ROW cost estimates through addressing these two problems.

Lucas, Matthew Allen

2007-12-01T23:59:59.000Z

72

Microsoft Word - CX-GrandCouleeDistrictWoodPoleReplacementsAccessRoadsFY13_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KEPR-Bell-1 SUBJECT: Environmental Clearance Memorandum Todd Wehner Civil Design/Access Roads - TELF-TPP-3 James Semrau Project Manager - TEP-TPP-1 Proposed Action: Wood pole replacement, equipment landing construction, and access road improvements along various transmission lines in Bonneville Power Administration's (BPA) Grand Coulee District. PP&A Project No.: 2152 (Grand Coulee-Chief Joseph No. 1), 2151 (Grand Coulee-Chief Joseph No. 2), 2121 (Grand Coulee-Foster Creek No. 1) and 1776 (Grand Coulee-Okanogan No. 2) Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance Location: Douglas and Okanogan counties, Washington. Refer to table below for project locations: Line Name Structure Township Range Section County

73

Cost Effectiveness of Cleaning Techniques for Controlling Human-based Transport of Invasive Exotic Plants on Electric Transmission L ine Rights-of-Way  

Science Conference Proceedings (OSTI)

This report provides a broad overview of accomplishments over the first 3 months of a project to define the cost effectiveness of cleaning techniques on electric transmission rights of way aimed at controlling the spread of invasive exotic (IE) vegetation. It includes the results of a brief literature search of cleaning techniques.BackgroundA science basis for process and procedure to cost effectively clean personnel and equipment so as to reduce the ...

2012-12-08T23:59:59.000Z

74

Cost Effectiveness of Cleaning Techniques for Controlling Human-based Transport of Invasive Exotic Plants on Electric Transmission Line Rights-of-Way  

Science Conference Proceedings (OSTI)

This Technical Update provides a broad overview of accomplishments over the first full year of the Electric Power Research Institute (EPRI) project to investigate the cost effectiveness of cleaning techniques to control human-based transport of invasive exotic plants on electric transmission line rights-of-way. One-half of the intended field work for the whole project (2012-2015) was completed, with attendant greenhouse and office work ongoing. EPRI expects the project to be completed in ...

2013-11-21T23:59:59.000Z

75

Tree Growth Regulators for Management of Trees in Electric Utility Rights-of-Way: A Literature and Current Application Status Review  

Science Conference Proceedings (OSTI)

Chemical growth regulators -- initially developed for horticultural and field crops -- provide a promising, cost-effective tool for management of trees under electric transmission and distribution lines in utility rights-of-way (ROWs). Paclobutrazol (commercial product Profile® 2SC) and flurprimidol (commercial product Cutless® tree implants) are potent tree growth regulators for a broad range of herbaceous and woody gymnosperm and angiosperm species. This review summarizes the published literatu...

2000-10-31T23:59:59.000Z

76

Microsoft Word - CX-Satsop-Aberdeen roads FY10_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30, 2010 30, 2010 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Jim Semrau Project Manager - TELF-TPP-3 Proposed Action: Maintenance of access roads serving the Satsop-Aberdeen No. 2 and No. 3, and the Aberdeen Tap to South Elma-Cosmopolis transmission lines PP&A Project No.: 1697 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads, equipment... routine maintenance activities, corrective...are required to maintain...infrastructures...in a condition suitable for a facility to be used for its designated purpose. Location: The Project is located in Gray's Harbor County, Washington, between the towns of

77

Simulating the effect of access road route slection on wind farm construction  

Science Conference Proceedings (OSTI)

Wind energy as a power source is attractive alternative to fossil fuels. Wind farms are typically constructed in undeveloped rural areas with challenging topography. The lack of a paved road network leading to the site and within the site itself pose ...

Khaled Nassar; Mohamed El Masry; Hesham Osman

2010-12-01T23:59:59.000Z

78

Power Line-Induced AC Potential on Natural Gas Pipelines for Complex Rights-of-Way Configurations, Volume 2: Graphic Analysis Handbo ok  

Science Conference Proceedings (OSTI)

Volume 2 is a handbook for graphic analysis designed for use by field personnel or others without access to a computer.

1983-05-01T23:59:59.000Z

79

Microsoft Word - CX-GrandCoulee-Bell3WestsideInsulatorRepAccessImprov_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mark Kjelland Mark Kjelland Project Manager - TEP-TPP-2 Proposed Action: Grand Coulee-Bell No. 3/Grand Coulee-Westside No. 1 double circuit 230-kV transmission line insulator replacement and access improvement project Budget Information: Work Order #00255064 PP&A Project No.: PP&A 1946 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads, equipment... routine maintenance activities, corrective....are required to maintain... infrastructures...in a condition suitable for a facility to be used for its designated purpose. Proposed by: Bonneville Power Administration (BPA) Location: The proposed Grand Coulee-Bell No. 3/Grand Coulee-Westside No. 1 double circuit

80

Power Line-Induced AC Potential on Natural Gas Pipelines for Complex Rights-of-Way Configurations, Volume 1: Engineering Analysis  

Science Conference Proceedings (OSTI)

This report addresses complex common corridor coupling problems for overhead electric power transmission lines and buried natural gas pipelines. Volume 1 describes the development of analytic methods for solving such problems and presents field data used in verification efforts. Volume 2 is a handbook for graphic analysis designed for use by field personnel or others without access to a computer. Volume 3 is a user's guide for the PIPELINE computer code.

1983-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "right-of-way access roads" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Curecanti-Blue Mesa-Salida 115-kV transmission lines access roads rehabilitation, maintenance, and construction project. Environmental Assessment  

SciTech Connect

Western Area Power Administration (Western) is a power marketing agency of the US Department of Energy, with jurisdiction in 15 western states. The Salt Lake City Area (SLCA) of Western performs the agency`s mission in parts of Colorado, New Mexico, Texas, Utah, Arizona, Wyoming, and Nevada. As part of its mission, Western owns, operates, and maintains a system of transmission lines for transmitting bulk electrical energy from points of generation to and between delivery points. Part of that system in southwestern Colorado includes the Blue Mesa-Curecanti and Blue Mesa-Salida 115-kV transmission lines. Western proposes to conduct maintenance and improve its access roads for these two transmission lines. This paper discusses the impacts to the existing environment as well as the environmental consequences resulting from the maintenance and construction that is proposed.

Not Available

1993-07-01T23:59:59.000Z

82

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-111) - (Fairview-Brandon #1, Fairview-Brandon #2 and Fairview-Rogue #1access road, danger tree and structure clearing) 9/25/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

25, 25, 2002 REPLY TO ATTN OF: KEPR-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-111) - (Fairview-Bandon #1, Fairview-Bandon #2 and Fairview-Rogue #1access road, danger tree and structure clearing) Benjamin Tilley Natural Resource Specialist Proposed Action: Vegetation Management for the Fairview-Bandon #1and #2 and Fairview- Rogue #1 transmission lines. Location: Throughout the Fairview-Bandon #1, Fairview-Bandon #2 and Fairview-Rogue #1 corridors located within Coos and Curry counties in Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: Tall-growing vegetation that is currently or will soon be a hazard to the line will be removed. Vegetation that will grow tall will be selectively eliminated before it reaches a height or density to begin competing with low-growing

83

(DOE/EIS-0285/SA-109): Supplement Analysis for the Transmission System Vegetation Management Program FEIS - (Santiam-Alvey # 1 #2 access road and structure clearing) 9/9/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 9, 2002 REPLY TO ATTN OF: KEPR-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-109) - (Santiam-Alvey # 1 and #2 access road and structure clearing) Benjamin Tilley Natural Resource Specialist Proposed Action: Vegetation Management for the Santiam-Alvey # 1 and #2 transmission line. Location: Throughout the Santiam-Alvey # 1 and #2 corridor located within Linn and Lane counties in Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: Tall-growing vegetation that is currently or will soon be a hazard to the line will be removed. Vegetation that will grow tall will be selectively eliminated before it reaches a height or density to begin competing with low-growing species. Cut-stump or follow- up herbicide treatments on re-sprouting-type species will be carried out to ensure

84

(DOE/EIS-0128-SA-02): Supplement Analysis: Los Banos-Gates (Path 15) Transmission line project changes to alignment, access road stream crossing, and basis for Supplemental EIS Determination  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Los Banos-Gates (Path 15) Transmission Line Project DOE/EIS-0128-SA02 Western Area Power Administration Sierra Nevada Customer Service Region U.S. Department of Energy Changes to Alignment, Access Road Stream Crossing, and Basis for Supplemental Environmental Impact Statement Determination Background The Los Banos-Gates 500-kilovolt Transmission Line project was originally proposed as part of the California-Oregon Transmission Project in the 1980s. These two projects were the subject of a single set of documents prepared in 1986 (draft) and 1988 (final) that served as the Environmental Impact Statement (EIS) under the National Environmental Policy Act and the Environmental Impact Report (EIR) under the California Environmental Quality Act. The EIS is entitled "Final Environmental Impact

85

CHESTNUT RIDGE RD VALLEY ROAD  

E-Print Network (OSTI)

.1 Miles 0.20 N Miles 0.20 TO MELTON VALLEY DRIVE HFIR PARKING WALK-IN ENTRY 7900 7964K - HFIR USER OFFICE RM 18 7972 HFIR High Flux Isotope Reactor 7962 HFIR User Office: 865-574-4523 BETHEL VALLEY RD BETHEL VALLEY RD BETHEL VALLEY RD RAMSEY DRIVE EGERACCESSROAD MELTON VALLEY DRIVE MELTON VALLEY ACCESS ROAD HFIR

86

Microsoft Word - CX-IndianCabinRoadRepair_PPA1908_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

United States Government Department of Energy United States Government Department of Energy Bonneville Power Administration DATE: June 22, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Elizabeth Johnson Natural Resource Specialist - TFBV-THE DALLES Proposed Action: Indian Cabin Road Repair PP&A Project No.: 1908 Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance activities...for structures, rights of way, infrastructures such as roads, equipment... routine maintenance activities, corrective....are required to maintain...infrastructures...in a condition suitable for a facility to be used for its designated purpose. Location: The project is located in Skamania County, Washington, T3N, R8E, Sections 27

87

CX-009088: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Categorical Exclusion Determination Curecanti-Crystal 115 Kilovolt Transmission Line Routine Maintenance of Existing Access Roads and Right-of-Ways CX(s) Applied: B1.3...

88

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

NLE Websites -- All DOE Office Websites (Extended Search)

configuration, and in the same location. All work will be confined to Western's right-of-way easement. Existing access would be used and no new roads are proposed. Equipment used...

89

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Curecanti-Lost Canyon 230-kV Access Roads and Western Area Power Administration Right-of-Way in Montrose, Ouray, San Miguel, Dolores, and Montezuma Counties, Colorado 1 A. Brief...

90

CX-009408: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Curecanti-Lost Canyon 230 Kilovolt Access Roads and Western Area Power Administration Right-of-Way CX(s) Applied: B1.3 Date: 05222012 Location(s): Colorado, Colorado,...

91

Definition: Right-Of-Way (Row) | Open Energy Information  

Open Energy Info (EERE)

or license rights to construct and maintain lines.1 Related Terms Transmission Owner, transmission lines, transmission line References Glossary of Terms Used in Reliability...

92

Recycled rubber roads  

SciTech Connect

The paper describes several innovative approaches for recycling old tires in the construction of roads. In one, 18 inches of shredded tire chips (2 X 2 inches) were used on top of 6-8 inches of small stone to construct a road across a sanitary landfill. No compacting or linders were needed. In another application, sidewall mats linked together with steel strapping were used as a sub-base for a road across a swampy area. A third application uses 1/2 inch bits of groundup rubber tires as a replacement for aggregate in an asphalt road base.

Not Available

1989-02-01T23:59:59.000Z

93

VEHICLE ACCESS PORTALS  

NLE Websites -- All DOE Office Websites (Extended Search)

East Jemez Road (Map 1) East Jemez Road (Map 1) VEHICLE ACCESS PORTALS Traffic Lane 1: Closed except for emergencies and maintenance operations. Traffic Lanes 2-7: Drivers required to stop and present LANL badges or other form of valid identification to Protective Force officers. Drivers may proceed upon direction of the officers. Note: Commercial delivery vehicle drivers must also pres- ent their inspection passes from Post 10. More Information: spp-questions@lanl.gov Non-work Hours Vehicles entering LANL at the East Jemez VAPs during non-work hours (between 7

94

RING ROAD SOUTH IVERSITY ROAD WEST  

E-Print Network (OSTI)

Webb ­ Earth Sciences R5 Aston Webb ­ B Block R6 Aston Webb ­ Great Hall R7 Aston Webb ­ C Block R8P P P Barber Institute ELSROAD M R.15 R.30 24h Security R.3 RING ROAD SOUTH U N IVERSITY ROAD WEST South Car Park P R21 R17 R18 R22 Main Library R19 R20R20 R23 R24R24 R25 Munrow Sport Centre R27 R26 R28

Sloman, Aaron

95

RING ROAD SOUTH IVERSITY ROAD WEST  

E-Print Network (OSTI)

­ Earth Sciences R5 Aston Webb ­ B Block R6 Aston Webb ­ Great Hall R7 Aston Webb ­ C Block R8 PhysicsP P P Barber Institute ELSROAD M R.15 R.30 24h Security R.3 RING ROAD SOUTH U N IVERSITY ROAD WEST South Car Park P R21 R17 R18 R22 Main Library R19 R2020 R23 R2424 R25 Munrow Sport Centre R27 R26 R28 R

Yao, Xin

96

WILDLAND ROAD REMOVAL: RESEARCH NEEDS  

E-Print Network (OSTI)

Service. 2003. Road decommissioning monitoring report 2002.management agencies are decommissioning roads to mitigateto ten percent by decommissioning up to 160,000 kilometers

Switalski, T. Adam; Bissonette, John A.; DeLuca, Tom H.; Luce, Charles H.; Madej, Mary Ann

2003-01-01T23:59:59.000Z

97

Alice on the Road  

E-Print Network (OSTI)

downhill, sucking her little Prius into the whoosh of theirsqueeze it all into her Prius with whatever paraphernaliaher absolute upper limit in the Prius, when she saw the road

Satterly, Faye Ann

2012-01-01T23:59:59.000Z

98

Blair Road Kudzu  

NLE Websites -- All DOE Office Websites (Extended Search)

Plant Management: Blair Road and Hwy 58 Intersection * Kudzu treated with foliar spray of Garlon 3a and Tordon by CSC in 2004. Photo by Harry Quarles Invasive Non-native...

99

Rapid road repair vehicle  

DOE Patents (OSTI)

Disclosed is a rapid road repair vehicle capable of moving over a surface to be repaired at near normal posted traffic speeds to scan for and find at the high rate of speed, imperfections in the pavement surface, prepare the surface imperfection for repair by air pressure and vacuum cleaning, applying a correct amount of the correct patching material to effect the repair, smooth the resulting repaired surface, and catalog the location and quality of the repairs for maintenance records of the road surface. The rapid road repair vehicle can repair surface imperfections at lower cost, improved quality, at a higher rate of speed than was not heretofor possible, with significantly reduced exposure to safety and health hazards associated with this kind of road repair activities in the past. 2 figs.

Mara, L.M.

1998-05-05T23:59:59.000Z

100

GRR/Section 3-MT-b - State Land Access | Open Energy Information  

Open Energy Info (EERE)

b - State Land Access b - State Land Access < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-MT-b - State Land Access 03MTBStateLandAccess (1).pdf Click to View Fullscreen Contact Agencies Montana Department of Natural Resources & Conservation Montana State Land Board Regulations & Policies Montana Code 77-4-101 et seq Geothermal Resources Natural Resources and Conservation Rules Triggers None specified Click "Edit With Form" above to add content 03MTBStateLandAccess (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative 3-MT-b.1 - Application for Lease, Right-of-Way, or Easement

Note: This page contains sample records for the topic "right-of-way access roads" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Categorical Exclusion for erosion repair and cactus relocation along the existing Tucson-Apache 11S-kV transmission line in Pima County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to construct a new access road along the existing Tucson-Apache 11S-kV transmission line within the existing right-of-way and to repair erosion damage at transmission line structures. Access road construction will consist of stripping, clearing and removing vegetation and blading and leveling to create a road within the existing right-of-way between structures 24/7-2S/2 & 2S/3- 26/S. We will be installing two gates to limit right-of-way access from Houghton Road. We will be creating reinforced embankments through the placement of

102

CX-007172: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

07172: Categorical Exclusion Determination 07172: Categorical Exclusion Determination CX-007172: Categorical Exclusion Determination Tucson-Apache Erosion Repair & Cactus Relocation CX(s) Applied: B1.3 Date: 02/23/2011 Location(s): Pima County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to construct a new access road along the existing Tucson-Apache 115-kilovolt (kV) transmission line within the existing right-of-way and to repair erosion damage at transmission line structures. Access road construction will consist of stripping, clearing and removing vegetation and blading and leveling to create a road within the existing right-of-way between structures 24/7-25/2 & 25/3- 26/5. We will be installing two gates to limit right-of-way access from Houghton Road. We

103

ACCESS CONTROL  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TERMSDEFINITIONS FROM DOE M 470.4-7 ACCESS CONTROL. The process of permitting access or denying access to information, facilities, nuclear materials, resources, or designated...

104

The Road to 2010  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Road to 2010 Road to 2010 Addressing the nuclear question in the twenty first century July 2009 The Road to 2010 Addressing the nuclear question in the twenty first century Presented to Parliament by the Prime Minister, by Command of Her Majesty July 2009 Cm 7675 £14.35 Photograph on page 16 by EDF; © EDF Photograph on page 20 by BNFL; © BNFL, image from www.IAEA.org Photograph on page 26 by British Army; © Crown copyright/MoD, image from www.photos.mod.uk Photograph on page 34 by CTBTO; © CTBTO Preparatory Commission, image from www.CTBTO.org Photograph on pages 42 and 45 by Dean Calma; © Dean Calma, image from www.IAEA.org © Crown Copyright 2009 The text in this document (excluding the Royal Arms and other departmental or agency logos) may be reproduced free of

105

The Bumpy Road to Hydrogen  

E-Print Network (OSTI)

It appears to us that hydrogen is a highly promising option06—16 The Bumpy Road to Hydrogen Daniel Sperling Joan OgdenThe Bumpy Road to Hydrogen 1 Daniel Sperling and Joan Ogden

Sperling, Dan; Ogden, Joan M

2006-01-01T23:59:59.000Z

106

EIS-0285-SA-46: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

structures, roads, and switches listed in Attachment 1. Attachment 1 identifies the Right of Way, Right of Way width,and Right of Way length of the proposed action....

107

PELICAN ISLAND Graded dirt road  

E-Print Network (OSTI)

Audubon SanctuaryRecommended route A B C D E F 0.5 mile BOLIVAR PENINSULA N to Crystal Beach Paved road #12;Bryan Beach Old Brazos River 1 mile N Paved road Graded dirt road Walking path Dike/Berm Mudflat

Lee, Cin-Ty Aeolus

108

RING ROAD SOUTH CHANCELLOR'S  

E-Print Network (OSTI)

Sciences R5 Aston Webb ­ B Block R6 Aston Webb ­ Great Hall R7 Aston Webb ­ C Block R8 Physics West R9P P 24-h Security R3 RING ROAD SOUTH CHANCELLOR'S COURT CHANCELLOR'S University Centre COURT Sports PitchesSports Pitches South Car Park R21 R17 R18 R22 Main Library R19 R23 R24 R 24 R14 R15 R16 East Gate O

Heinke, Dietmar

109

Road Decommissioning: Minimising the Adverse Ecological Effects of Roads i9n European Agriculture Landscapes  

E-Print Network (OSTI)

road corridors post-decommissioning, especially those roadsof RRE - that of road decommissioning. To date even thoughFor this reason, road decommissioning can potentially: (1)

Dolan, Lisa; Whelan, Pádraig M.

2007-01-01T23:59:59.000Z

110

Scientific Access  

NLE Websites -- All DOE Office Websites (Extended Search)

Scientific Access The APS is a open user facility that makes beam time available to the international scientific community through a peer-reviewed proposal process. Two access...

111

KALELE ROAD Parking Office  

E-Print Network (OSTI)

Environ. Health Transportation Services Landscaping No Vehicle Access No Public Vehicle Access No Public Marine Fisheries Service East-West Kiosk Center for Korean Studies Pope Laboratory Sherman Laboratory St`uokalani Center for Student Services Maile Way Annexes Gilmore Hall Shidler College of Business Lab School Lockers

112

CX-003232: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

32: Categorical Exclusion Determination 32: Categorical Exclusion Determination CX-003232: Categorical Exclusion Determination Ostrander-Troutdale Number 1 Access Road Maintenance CX(s) Applied: B1.3 Date: 07/30/2010 Location(s): Clackamas County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration proposes to rebuild and/or repair an existing access road and right-of-way road that provides access to the Ostrander-Troutdale Number 1 transmission line and right-of-way access for motile sites between mile/structure 10/1 to 17/3 and one site on the Big Eddy-Troutdale 63/1 ? 63/2 line. Ostrander-Troutdale Number 1 transmission line access road maintenance including grading and rocking of road surfaces and installation of water bars and cross drain culverts. DOCUMENT(S) AVAILABLE FOR DOWNLOAD

113

Autonomous Robotic Vehicle Road Following  

Science Conference Proceedings (OSTI)

A description is given of the system architecture of an autonomous vehicle and its real-time adaptive vision system for road-following. The vehicle is a 10-ton armored personnel carrier modified for robotic control. A color transformation that best discriminates ... Keywords: adaptive systems, adaptive vision system, armored personnel carrier, autonomous vehicle, color transformation, computer vision, computerised navigation, computerised pattern recognition, image coordinate system, image segmentation, maximum-likelihood pixel classification, military systems, real-time, road region boundary, road vehicles, road-following, robotic vehicle, robots

D. Kuan; G. Phipps; A.-C. Hsueh

1988-09-01T23:59:59.000Z

114

Road to Net Zero (Presentation)  

Science Conference Proceedings (OSTI)

A PowerPoint presentation on NREL's Research Support Facility (RSF) and the road to achieving net zero energy for new construction.

Glover, B.

2011-05-01T23:59:59.000Z

115

Open Access  

NLE Websites -- All DOE Office Websites (Extended Search)

Communication » Communication » Open Access Open Access Open access (OA) is the practice of providing unrestricted access via the Internet to peer-reviewed scholarly journal articles. Learn more below... Questions? Open Access Email Open access publishing and publications have experienced substantial growth, expansion and uptake in recent years. What exactly is an open access publication? There are many definitions, but in a nutshell an open access publication is a publication that provides immediately free online access to all users worldwide. This may sound like a tall order, and yet there are to date over 4000 journal publications that fit this definition. The need for this type of access has been driven by the out-of-control costs for scholarly publications. Statistics kept by the Association for Research Libraries

116

Life cycle assessment of LED road lighting.  

E-Print Network (OSTI)

???It is observed that the power consumption of road lighting is increased with the length of trafficable road in Hong Kong. The energy used in… (more)

Chan, Ho-kan.

2012-01-01T23:59:59.000Z

117

EA-1941: Boyer-Tillamook Access Road Improvement Project, Tillamook...  

NLE Websites -- All DOE Office Websites (Extended Search)

walls. In addition, new bridges would be built, and culverts that currently block fish passage for anadromous and resident fish would be replaced. Additional information is...

118

VNG's Hampton Roads Pipeline Crossing  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

VNG's Hampton Roads Pipeline Crossing VNG's Hampton Roads Pipeline Crossing FUPWG Conference Fall 2008 Williamsburg, Virginia Connection to DTI at Quantico Columbia Limitations South Hampton Roads served by a single pipeline Southside dependent on back up systems LNG Propane/air Two supply sources to VNG What if we connected pipelines? It would take Two Water Crossings Two Compressor Stations Construction in densely populated cities It could Deliver over 200,000 Dth of incremental supply Serve VNG, Columbia and Dominion customers ...we would get... Hampton Roads Crossing - HRX Hampton / Newport News Craney Island Norfolk 21 miles of 24" pipe 7 miles in Hampton/Newport News 4 miles in Norfolk 10 miles of water and island crossing 4 mile harbor crossing 4.5 miles on Craney

119

Early Cook County Roads -- Part One  

NLE Websites -- All DOE Office Websites (Extended Search)

One One Nature Bulletin No. 738 January 11, 1964 Forest Preserve District of Cook County Seymour Simon, President Roberts Mann, Conservation Editor EARLY COOK COUNTY ROADS -- PARK ONE When Chicago was incorporated as a village in 1833 it was only a squalid hamlet of about 350 inhabitants and appeared to be so poorly situated that it was hopeless -- "crude cabins and flimsy shacks in a chaos of mud, rubbish and confusion. " Only a few feet above the level of Lake Michigan, the place was almost entirely surrounded by swamps and miles and miles of prairies that became nearly impassable after spring thaws and during periods of heavy rainfall. There were only two important routes that afforded access at all times. One was the Green Bay Trail, ancestor of North Clark St. in Chicago, Ridge Ave. in Evanston, and Green Bay Road north of that. The other, traveled by the soldiers coming from Detroit to build Fort Dearborn in 1803, used the Great Sauk Trail to La Porte, Indiana, then a trail northwesterly to what is now Michigan City, and the firm sands of the lake beach the rest of the way.

120

Open Access  

E-Print Network (OSTI)

© 2007 Brewer; licensee BioMed Central Ltd. This is an Open Access article distributed under the terms of the Creative Commons Attribution License

Earl J Brewer; Earl J Brewer

2007-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "right-of-way access roads" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Innovative Corridors Initiative: Business Model Analysis  

E-Print Network (OSTI)

standard procedures to grant access to public rights-of-way.rights-of-way as long as the proposal meets all safety and engineering standards and

Shaheen, Susan; Lingham, Viginia; Finson, Rachel S.

2007-01-01T23:59:59.000Z

122

Notices Bldg., 901 Pilottown Road, Lewes, DE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 Federal Register 4 Federal Register / Vol. 77, No. 249 / Friday, December 28, 2012 / Notices Bldg., 901 Pilottown Road, Lewes, DE 19958. January 17, 2013: 7-9 p.m.; Ocean County Administration Building, 101 Hooper Avenue, Public Hearing Room #119, Toms River, NJ 08754. Special Accommodations The hearings are physically accessible to people with disabilities. Requests for sign language interpretation or other auxiliary aids should be directed to M. Jan Saunders at the Mid-Atlantic Council Office, (302) 526-5251, at least 5 days prior to the hearing date. Dated: December 21, 2012. Tracey L. Thompson, Acting Deputy Director, Office of Sustainable Fisheries, National Marine Fisheries Service. [FR Doc. 2012-31148 Filed 12-27-12; 8:45 am] BILLING CODE 3510-22-P COMMODITY FUTURES TRADING

123

CX-003610: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

610: Categorical Exclusion Determination 610: Categorical Exclusion Determination CX-003610: Categorical Exclusion Determination Ross-Lexington Number 1 Access Road Repair Project CX(s) Applied: B1.3 Date: 08/25/2010 Location(s): Cowlitz County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to re-construct an existing access road along the Ross-Lexington Number 1 transmission line right-of-way (ROW) located in Cowlitz County, Washington. During the winter of 2008-09 a portion of the access road washed out during heavy rain, making passage impossible. The remaining portions of the road are heavily damaged and in dire need of repair. The proposed action will allow safe and timely access to the right of way which will help reduce outage times and

124

ACCESS CONTROL  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TERMS/DEFINITIONS FROM DOE M 470.4-7 TERMS/DEFINITIONS FROM DOE M 470.4-7 ACCESS CONTROL. The process of permitting access or denying access to information, facilities, nuclear materials, resources, or designated security areas. ACCESS CONTROL MEASURES. Hardware and software features, physical controls, operating procedures, administrative procedures, and various combinations of these designed to detect or prevent unauthorized access to classified information; special nuclear materials; Government property; automated information systems, facilities, or materials; or areas containing the above and to enforce use of these measures to protect Departmental security and property interests. CRITICAL PATH SCENARIO. An adversary-based scenario that is generated during the conduct of a vulnerability assessment and accounts for adversary tactics that

125

(DOE/EIS-0285/SA 107): Supplement Analysis for the Transmission System Vegetation Management Program FEIS, Elma-Cosmopolis #1 9/5/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 7, Elma-Cosmopolis #1. James A. Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Elma-Cosmopolis #1 115kV transmission line corridor from structure 11/7 through structure 20/3. Right of way width averages 100 feet. Location: The project area is located in Grays Harbor County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridors. Approximately 8 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 2.8 miles of access roads will be cleared using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Tower sites

126

(DOE/EIS-0285/SA-119): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 1/29/03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2003 9, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-119 Snohomish-Murray No. 1 Transmission Line Don Atkinson - TFN/Snohomish Proposed Action: Vegetation Management along the Snohomish-Murray No. 1 Transmission Line from structure 2/6 through structure 18/6. Right of way width is 95 feet. Location: The project area is located within Snohomish County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridor. Total right-of-way acreage is approximately 182.8 acres. Approximately 17 miles of access roads will

127

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 106 SnoKing Tap to Monroe-Samamish Line 9/30/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30, 30, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 106 SnoKing Tap to Monroe-Samamish Line Don Atkinson - TFN/Snohomish Proposed Action: Vegetation Management along the SnoKing Tap to the Monroe-Samamish transmission line from structure 8/1 through structure 20/6. Right of way width is 150 feet. Location: The project area is located within Snohomish County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridor. The right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 12 miles of access roads

128

EIS-0285-SA-133: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Supplement Analysis 3: Supplement Analysis EIS-0285-SA-133: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management for the Hanford-Ostrander Corridor from structure 126/1 through structure 146/4. Right of way width averages 312 feet. BPA proposes to remove unwanted vegetation along the right-of-way, access roads, and around tower structures along the subject transmission line corridors. Approximately 20 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Access roads and tower sites will be cleared using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Vegetation management is required for unimpeded operation and maintenance of the subject transmission line

129

Suggested Talking Points for Hydrogen Road Tour | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Suggested Talking Points for Hydrogen Road Tour Suggested Talking Points for Hydrogen Road Tour Suggested Talking Points for Hydrogen Road Tour More Documents & Publications...

130

Virginia EV Road Show - PHEV Operations and Performance  

NLE Websites -- All DOE Office Websites (Extended Search)

- Virginia EV Road Show - PHEV Operations and Performance Jim Francfort Virginia Clean Cities and Hampton Roads Clean Cities Coalition - Virginia Electric Drive Road Show Poquoson,...

131

Electric Transmission Right-of-Way Post-Blackout Vegetation Management Strategies  

Science Conference Proceedings (OSTI)

The blackout on August 14, 2003, was the largest in U.S. history. It started with a line going out in Ohio. It affected eight U.S. states and one Canadian province. It covered more than 9000 sq miles (23,310 sq km). It disrupted over 61,000 MW of power. It caused three deaths. It closed 12 major airports. It touched more than 50 million peopleone-third of the Canadian population and one-seventh of the U.S. population. It cost more than US4 billion in lost economic activity.1 The blackout was caused by ca...

2007-02-01T23:59:59.000Z

132

Electric Transmission Line Right-of-Way Post-Blackout Vegetation Management Strategies: 2008 Update  

Science Conference Proceedings (OSTI)

The role of the federal government in regulating vegetation management on power line corridors changed significantly after the August 2003 blackout that affected more than 50 million people in the eastern United States and Canada. In 2004, the Federal Energy Regulatory Commission (FERC) released a series of reports on vegetation management associated with the blackout, with a respondent sequence of draft standards for vegetation management released from 2005-2006. These standards are being promulgated an...

2008-12-08T23:59:59.000Z

133

Evolving Rights-of-Way Vegetation Management Standards and Practices: Update 2010  

Science Conference Proceedings (OSTI)

Current regulations are shaping how transmission vegetation management is implemented in North America. Regulations are maturing and fines for violations of the NERC standard FAC-003-1 are becoming larger and more consistently assessed. Transmission vegetation managers must maintain a transmission system with no vegetation caused outages and do so cost effectively in an environmental acceptable manner that meets landowner and public approval.

2010-12-08T23:59:59.000Z

134

CX-006296: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6296: Categorical Exclusion Determination 6296: Categorical Exclusion Determination CX-006296: Categorical Exclusion Determination Cardwell-Cowlitz 2011 Access Road Maintenance CX(s) Applied: B1.3 Date: 07/21/2011 Location(s): Cowlitz County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to perform routine road maintenance and reconstruction activities along existing access roads, both on and off the right-of-way. The work involves approximately 4.7 miles of road reconstruction or improvement work on or leading to the Cardwell-Cowlitz No. 1, 115- kilovolt transmission line right-of-way between Cardwell Substation and structure 7/8. The roadwork is needed to improve access for crews that will be replacing the transmission line support structures within the transmission line corridor.

135

Infrared Thermometry in Winter Road Maintenance  

Science Conference Proceedings (OSTI)

There is significant interest among road authorities in measuring pavement conditions to perform appropriate winter road maintenance. The most common monitoring methods are based on pavement-mounted sensors. This study’s hypothesis is that the ...

Patrik Jonsson; Mats Riehm

2012-06-01T23:59:59.000Z

136

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Morrow Point 230-kV and 12.47-kV Transmission Lines Access Road Maintenance Morrow Point 230-kV and 12.47-kV Transmission Lines Access Road Maintenance Montrose County, Colorado A. Brief Description of Proposal: Western Area Power Administration's Montrose Maintenance Field Office (Western) proposes to grade and maintain 5.9 miles of existing access roads. The roads access structures along the Curecanti to Morrow Point 230-kV and 12.47-kV Transmission Lines in Montrose County, Colorado. Maintenance will include installing culverts in dry crossings, pulling ditches, maintaining waterbars, removal of vegetation, sloughed soil, and rock from the access roads. The road maintenance will remain within the existing right-of-ways for access roads and transmission lines. B. Number and Title of the Categorical Exclusion Being Applied: (See text in 10 CFR Part 1021,

137

Adaptive Routing for Road Traffic  

Science Conference Proceedings (OSTI)

Several technologies for motorists ease their travel on today's congested roads. However, these services aren't linked to each other and using them while driving can be dangerously distracting. This article reports on an integrated system that uses congestion ... Keywords: routing, congestion, Trafficmaster, GPS, GSM.

John Fawcett; Peter Robinson

2000-05-01T23:59:59.000Z

138

KALELE ROAD D Dormitory Lot  

E-Print Network (OSTI)

Environ. Health Transportation Services Landscaping No Vehicle Access No Public Vehicle Access No Public Kiosk Bachman Kiosk Gym 1 Gym 2 UH Parking Access St. Francis School University Health Services Mnoa Fisheries Service East-West Kiosk Center for Korean Studies Pope Laboratory Sherman Laboratory St. John

139

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CrystalllS-kV Transmission Line Routine Maintenance of CrystalllS-kV Transmission Line Routine Maintenance of Existing Access Roads and Right-of-Ways Montrose County, Colorado A. Brief Description of Proposal: Western Area Power Administration (Western) proposes to perform routine maintenance of existing access roads and right-of-ways (ROW) along the Curecanti-Crystal (CCI-CRY) liS-kilovolt (kV) transmission line to safely access structures 112,1/6,4/1, 6IS-6, 7/1-9, and 8/1-4 (approximately 3 miles). The project is located on private and u.s. Bureau of Land Management (BLM) lands in Montrose County, Colorado. Routine maintenance actions proposed for CCI-CRY IIS-kV transmission line include the following: I) Access road grading and improvements. A rubber-tired motor grader andlor a track dozer would

140

Tanzania Roads Evaluation - Baseline | Data.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Tanzania Roads Evaluation - Baseline Tanzania Roads Evaluation - Baseline Agriculture Community Menu DATA APPS EVENTS DEVELOPER STATISTICS COLLABORATE ABOUT Agriculture You are here Data.gov » Communities » Agriculture » Data Tanzania Roads Evaluation - Baseline Dataset Summary Description Baseline survey for impact evaluation of MCC's roads improvement investments in Tanzania. The evaluation will examine the project's household- and community-level effects on local standards of living along the roads. For the evaluation of major roads on the mainland, Economic Development Initiatives conducted a survey of 3,000 households in 200 communities in 2009. For the Pemba rural roads evaluation, Economic Development Initiatives conducted a survey on 570 households in the treatment group and 630 households in the comparison group.

Note: This page contains sample records for the topic "right-of-way access roads" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Microsoft Word - CX-GrandCoulee-OkanoganWP-AR-Landing_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REPLY TO ATTN OF: KEPR-Bell-1 SUBJECT: Environmental Cleareance Memorandum Jim Semrau Robert Keudell Road Engineer - TELF-TPP-3 Line Foreman III - TFWK-Grand Coulee Todd Wehner Robert Zellar Road Engineer - TELF-TPP-3 Line Foreman I - TFWK-Grand Coulee Proposed Action: Wood pole replacement, equipment landing construction and access road construction/maintenance along the Grand Coulee-Okanogan #2 115-kV transmission line right-of-way (ROW). PP&A Project No: 1776 Work Order No.: 275584 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021):  B1.13 Construction, acquisition, and relocation of onsite pathways and short onsite access roads and railroads.  B1.3 Routine maintenance activities...for structures, rights-of-way, infrastructures such

142

ENVIRONMENT AL REVIEW for CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CCW-MID TRANSMISSION LINE ACCESS ROAD MAINTENANCE CCW-MID TRANSMISSION LINE ACCESS ROAD MAINTENANCE Fremont County, Colorado A. Brief Description of Proposal: Western's Montrose Maintenance Field Office plans to grade roads on access roads to structures 147-5 to 148-4; 134-3 to 135-2 near Penrose, CO, Maintenance will include removal of sloughed soil and rock from the access roads and blading. Road work will remain within the existing right of way. B. Number and Title of the Categorical Exclusion Being Applied: (See text in 10 eFR Part 1021, Subpart D.) B 1.3 Routine maintenance/custodial services for buildings, structures, infrastructures, equipment. .. (h) Repair of road embankments. C. Regulatory Requirements in 10 CFR 1021.410 (b): (See full text in regulation and attached checklist.) I) The proposed action fits within a class of actions that is listed in Appendix A or B to

143

An Automated Nowcasting Model of Road Surface Temperature and State for Winter Road Maintenance  

Science Conference Proceedings (OSTI)

Winter road maintenance is an important application field of meteorology in western and northern Europe, North America, and many other parts of the world. In order to provide timely short-period high-accuracy forecasts of road surface temperature ...

J. Shao; P. J. Lister

1996-08-01T23:59:59.000Z

144

Towards a user-centred road safety management method based on road traffic simulation  

Science Conference Proceedings (OSTI)

One of the most important gaps in road safety management practises is the lack of mature methods for estimating reliability. Road safety performance assessment systems have been developed; however, these provide only historical or retrospective analyses. ...

Andreas Gregoriades

2007-12-01T23:59:59.000Z

145

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Flaming Gorge Microwave Site Communications Building Access Road Repairs Flaming Gorge Microwave Site Communications Building Access Road Repairs Daggett County, Utah A. Brief Description of Proposal: Westem Area Power Administration (Westem) proposes to conduct routine maintenance and repair an access road right-of-way to its Flaming Gorge microwave site communications building. The building is located on a hill to the west of the Flaming Gorge Dam visitor center parking lot. Road improvements will be conducted on approximately 500 linear feet of existing road to improve drivability and access by Western crews to the communications building. Western crews will utilize rubber-tired vehicles including a motor grader, backhoe tractor, and bobcat skid steer loader to improve the access road and create a safe travel surface.

146

Southwestern Power Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

Brochure Right-of-Way A right-of-way is a safety zone around Southwestern's high voltage transmission lines. This safety zone must be kept free of trees, buildings, fences, roads,...

147

On-Road Emissions in Asia Measured by Remote Sensing.  

E-Print Network (OSTI)

On-Road Emissions in Asia Measured by Remote Sensing. · Donald H. Stedman, Gary A. Bishop on-road advantage · Large on-road emissions cause poor air quality. · Remote sensing measures on

Denver, University of

148

Road traffic congestion in the developing world  

Science Conference Proceedings (OSTI)

Road traffic jams continue to remain a major problem in most cities around the world, especially in developing regions resulting in massive delays, increased fuel wastage and monetary losses. Due to the poorly planned road networks, a common outcome ... Keywords: congestion collapse, simulation, traffic congestion, traffic detection

Vipin Jain; Ashlesh Sharma; Lakshminarayanan Subramanian

2012-03-01T23:59:59.000Z

149

Road Surface Condition Forecasting in France  

Science Conference Proceedings (OSTI)

A numerical model designed to simulate the evolution of a snow layer on a road surface was forced by meteorological forecasts so as to assess its potential for use within an operational suite for road management in winter. The suite is intended ...

L. Bouilloud; E. Martin; F. Habets; A. Boone; P. Le Moigne; J. Livet; M. Marchetti; A. Foidart; L. Franchistéguy; S. Morel; J. Noilhan; P. Pettré

2009-12-01T23:59:59.000Z

150

Access to the ALS  

NLE Websites -- All DOE Office Websites (Extended Search)

Access to the ALS Access to the ALS Print User Access The ALS experiment floor (Building 6) is a Controlled Access Area for radiation protection. All ALS users are required to...

151

Access to the ALS  

NLE Websites -- All DOE Office Websites (Extended Search)

Gate Access Access to the ALS Print User Access The ALS experiment floor (Building 6) is a Controlled Access Area for radiation protection. All ALS users are required to register...

152

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hesperus-Montrose (Project No.3) 345-kV Transmission Line and Hesperus-Montrose (Project No.3) 345-kV Transmission Line and Curecanti-Lost Canyon 230-kV Transmission Line Routine Maintenance of Right-of-Way Roads La Plata, Montezuma, Dolores, San Miguel, and Montrose Counties, Colorado A. Brief Description of Proposal: Western Area Power Administration (Western) proposes to perform routine maintenance of existing access road and right-of-way (ROW) roads along the Hesperus- Montrose (HSP-MTR) 345-kilovolt (leV) Transmission Line located between Montrose and Norwood, Colorado. The project will provide safe access to transmission line structures 0 to 194 (approximately 110 miles). Also, Westem proposes to perform routine maintenance between structures 40/1 to 59/5 of the Curecanti-Lost Canyon (CCI-LCN) 230-kV Transmission Line. The

153

Microsoft Word - CX-GrandCoulee-ChiefJoseph_ARandWood Poles_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REPLY TO ATTN OF: KEPR-Bell-1 SUBJECT: Environmental Cleareance Memorandum Todd Wehner Road Engineer - TELF-TPP-3 Robert Keudell Line Foreman III - TFWK-Grand Coulee Robert Zellar Line Foreman I - TFWK-Grand Coulee Proposed Action: Wood pole replacement, equipment landing construction and access road construction/maintenance along portions of the Grand Coulee-Chief Joseph #1 and #2 230-kV transmission line rights-of-way. PP&A Project No: 1777 Work Order No.: 275582 and 275583 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021):  B1.13 Construction, acquisition, and relocation of onsite pathways and short onsite access roads and railroads.  B1.3 Routine maintenance activities...for structures, rights-of-way, infrastructures such

154

Microsoft Word - CX-TAFT-HOTSmile5tomile15revision_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2010 6, 2010 REPLY TO ATTN OF: KEPR-Bell-1 SUBJECT: Environmental Clearance Memorandum Todd Wehner Project Manager - TELP-TPP-3 Michael Stolfus Lineman Foreman III - TFKF-Kalispell Proposed Action: Conduct access road maintenance, landing construction and structure maintenance from mile 5 through mile 15 of the Taft-Hot Springs #1 500-kV transmission line right-of-way (ROW). PP&A Project No: 1775 Work Order No.: 00264402 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021):  B1.13 Construction, acquisition, and relocation of onsite pathways and short onsite access roads and railroads.  B1.3 Routine maintenance activities...for structures, rights of way, infrastructures such as roads, equipment...routine maintenance activities, corrective....are required to

155

Murdock Road Knoxville.TN  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

702 702 Murdock Road Knoxville.TN 37932 Tel: (609) 921-1456 Fax: (609) 92 1-8703 AA\W.nell-one.com March 25,2009 Office of the Assistant General Counsel for Technology Transfer and Intellectual Property U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585 Attn: Technology Transfer Questions Subject: Questions Concerning Technology Transfer Practices at DOE Laboratories (Federal RegisterNol. 73, No. 229/ November 26,2008 /Notices) Dear Mr. Gottlieb, Thank you for the opportunity to respond to the questions published in the Federal Register. As Chief Executive Officer of Nell One Therapeutics, a spin-out company which is in the process of licensing technology from Oak Ridge National Laboratory (ORNL), I found the questions to be highly relevant to our experiences. While many great technologies and capabilities reside in the National Laboratories

156

Forest Road Building Regulations | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here You are here Home » Forest Road Building Regulations Forest Road Building Regulations < Back Eligibility Utility Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Schools Retail Supplier Institutional Fuel Distributor Nonprofit Transportation Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info Start Date 09/2010 State Wisconsin Program Type Environmental Regulations The Wisconsin Department of Natural Resources has regulations for building a forest road, if development requires one. Regulations include zoning ordinances and permits for stream crossing, grading, stormwater, and

157

(DOE/EIS-0285-SA-115): Supplement Analysis for the Transmission System Vegetation Management Program FEIS, Shelton-Fairmount # 1-4 12/20/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 0, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 115, Shelton- Fairmount # 1-4. James A. Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Shelton Fairmount # 1-4 230kV & 115kV transmission lines corridor from structure 34/3 through structure 60/2 (reference line ADNO 8354). Right of way width averages 258 feet. Location: The project area is located in Jefferson County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridors. Approximately 26 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and

158

(DOE/EIS-0285/SA 118): Supplement Analysis for the Transmission System Vegetation Management Program EIS, Holcomb-Naselle 115kV)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2003 7, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-SA 118, Holcomb - Naselle 115 kV. James A. Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Holcomb Naselle 115kV transmission line corridor from structure 1/1 through structure 21/10. Right of way width averages 100 feet. Location: The project area is located in Pacific County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridor. Approximately 21 miles of right-of-way will be treated using selective and non-selective

159

(DOE/EIS-0285/SA 108): Supplement Analysis for the Transmission System Vegetation Management Program FEIS Satsop-Aberdeen #2 9/5/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 8, Satsop-Aberdeen #2. James A. Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Satsop-Aberdeen #2 230kV transmission line corridor from structure 1/1 through structure 11/5 (reference line). Other lines which are present in the proposed corridor are the Satsop-Aberdeen #3 230 kV, South Elma-Cosmopolis 115kV, and Aberdeen tap to South Elma-Cosmospolis 115kV. Right of way width averages 238 feet. Location: The project area is located in Grays Harbor County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridors. Approximately 11 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide

160

EIS-0285-SA-13: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0285-SA-13: Supplement Analysis EIS-0285-SA-13: Supplement Analysis EIS-0285-SA-13: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management along the Naselle Tarlett #1 and #2 transmission line Right of Way. BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. Also, access road clearing will be conducted. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening

Note: This page contains sample records for the topic "right-of-way access roads" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

On-road remote sensing of vehicle emissions in  

E-Print Network (OSTI)

On-road remote sensing of vehicle emissions in the Auckland Region August 2003 Technical 1877353000 www.arc.govt.nz #12;TP 198 On-Road Remote Sensing of Vehicle Emissions in the Auckland Region #12;Page i TP 198 On-Road Remote Sensing of Vehicle Emissions in the Auckland Region On-road remote sensing

Denver, University of

162

Rattlesnake Road Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Rattlesnake Road Wind Farm Rattlesnake Road Wind Farm Jump to: navigation, search Name Rattlesnake Road Wind Farm Facility Rattlesnake Road Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Horizon Developer Horizon Energy Purchaser Constellation Energy/PG&E Location Gilliam County west of Arlington OR Coordinates 45.700461°, -120.280581° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.700461,"lon":-120.280581,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

163

Hampton Roads Demonstration Project | Open Energy Information  

Open Energy Info (EERE)

Roads Demonstration Project Roads Demonstration Project Jump to: navigation, search Name Hampton Roads Demonstration Project Facility Hampton Roads Demonstration Project Sector Wind energy Facility Type Offshore Wind Facility Status Proposed Developer Virginia State Government Location Chesapeake Bay VA Coordinates 36.965°, -76.289° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":36.965,"lon":-76.289,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

164

Overview of the ROADS'09 workshop  

Science Conference Proceedings (OSTI)

This report presents a brief overview of the organization and the program of the fourth Real Overlays and Distributed Systems Workshop ROADS'09 co-located with the 22nd SOSP conference at Big Sky, Montana.

Walid Dabbous; Maximilian Ott

2010-01-01T23:59:59.000Z

165

HCEI Road Map: 2011 Edition (Brochure)  

SciTech Connect

This road map outlines the 2011 key goals and strategies of the Hawaii Clean Energy Initiative, was founded based on a Memorandum of Understanding between the State of Hawaii and the U.S. Department of Energy in 2008.

Braccio, R.; Finch, P.

2011-08-01T23:59:59.000Z

166

HCEI Road Map: 2011 Edition (Brochure)  

Energy.gov (U.S. Department of Energy (DOE))

This road map outlines the 2011 key goals and strategies of the Hawaii Clean Energy Initiative, was founded based on a Memorandum of Understanding between the State of Hawaii and the U.S. Department of Energy in 2008.

167

The Silk Road Leads to the APS  

NLE Websites -- All DOE Office Websites (Extended Search)

The silk road leads to the APS Lori Khatchadourian (University of Michigan) and Adam Smith (The University of Chicago) switch sample mounts at the ChemMatCARS 15-ID-D beamline. The...

168

Access to the ALS  

NLE Websites -- All DOE Office Websites (Extended Search)

Access to the ALS Print User Access The ALS experiment floor (Building 6) is a Controlled Access Area for radiation protection. All ALS users are required to register with the ALS...

169

Capital Access Program (Vermont)  

Energy.gov (U.S. Department of Energy (DOE))

The Capital Access Program provides loan guarantees to small businesses seeking access to commercial credit. Premiums paid by the borrower and matched by Vermont Economic Development Authority fund...

170

CX-010110: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10: Categorical Exclusion Determination 10: Categorical Exclusion Determination CX-010110: Categorical Exclusion Determination Hesperus-Montrose (Project No. 3) 345 Kilovolt (kV) Transmission Line and Curecanti-Lost Canyon 230-kilovolt Transmission Line Routine Maintenance of Right-of-Way Roads CX(s) Applied: B1.3 Date: 04/26/2013 Location(s): Colorado, Colorado, Colorado, Colorado, Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) proposes to perform routine maintenance of existing access road and right-of-way (ROW) roads along the Hesperus Montrose (HSP-MTR) 345-kilovolt (kV) transmission line located between Montrose and Norwood, Colorado. CX-010110.pdf More Documents & Publications CX-008790: Categorical Exclusion Determination

171

CX-005847: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

847: Categorical Exclusion Determination 847: Categorical Exclusion Determination CX-005847: Categorical Exclusion Determination Rocky Reach - Maple Valley Access Road Repair CX(s) Applied: B1.3 Date: 05/05/2011 Location(s): King County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) is proposing to build and/or repair approximately 18,000 feet of access road and right-of-way road that provides access to the Rocky Reach-Maple Valley Number 1 transmission line in King County, Washington. The work is necessary to repair damage done to access roads caused by a major flood event that occurred on November 7, 2006, and thus provide continued system stability. The project includes but is not limited to: - Reconstruction (blading, reshaping, grading, and compacting) of existing road surfaces - Hauling, placing, and shaping of

172

IRF-World Road Statistics | Open Energy Information  

Open Energy Info (EERE)

IRF-World Road Statistics IRF-World Road Statistics Jump to: navigation, search Tool Summary LAUNCH TOOL Name: IRF-World Road Statistics Agency/Company /Organization: International Road Statistics Focus Area: Transportation, Economic Development Resource Type: Dataset Website: www.irfnet.org/statistics.php Cost: Paid IRF-World Road Statistics Screenshot References: IRF-World Road Statistics[1] "IRF World Road Statistics (WRS) compiles the most up-to-date official international road, traffic and transport data. The publication further provides a selection of the latest Sustainable Development Indicators and other data of key relevance, not only to industry and business but also to leading international organisations and financial institutions." References ↑ "IRF-World Road Statistics"

173

Monitoring the recovery of decommissioned roads with citizen scientists in the Clearwater National Forest, Idaho  

E-Print Network (OSTI)

monitoring following road decommissioning . Wildlands CPR,research on road decommissioning, which will in turn allowService. 2003. Road decommissioning monitoring report 2002.

Court, Katherine; Switalski, T. Adam; Broberg, Len; Lloyd, Rebecca

2005-01-01T23:59:59.000Z

174

Wildlife Use of Open and Decommissioned Roads on the Clearwater National Forest, Idaho  

E-Print Network (OSTI)

the effectiveness of road decommissioning (Switalski et al.hunting season. Road decommissioning has been recommended toresulting from road decommissioning has also been predicted

Switalski, T. Adam; Broberg, Len; Holden, Anna

2007-01-01T23:59:59.000Z

175

(DOE/EIS-0285/SA-121): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-121): 2/12/03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2003 2, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-121 Murry-Custer No. 1 Don Atkinson - TFN/Snohomish Proposed Action: Vegetation Management along the Murry-Custer No.1 transmission line from structure 1/1 through structure 6/2. Corridor width is 125 feet. Location: The project area is located within Snohomish County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridor. Approximately 77.5 acres of right-of-way, 6 miles of access road, and 48 structure sites will be

176

Supplement Analysis for the Transmission System Vegetation Management Program FEIT (DOE/EIS-0285/SA-95) Chehalis-Olympia No. 1 and Chehalis-Centralia No. 2  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5) 5) Chehalis-Olympia No.l and Chehalis-Centralia No. 2 James A. Jellison - TFO/Olympia Natural Resource Specialist Proposed Action: Vegetation management along the Chehalis-Olympia No. 1 and Chehalis-Centralia No. 2, 230kV transmission line. The project area is located within Lewis and Thurston Counties, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridor. The right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 29 miles of access roads and corridor will be treated. Vegetation management is required for unimpeded operation and maintenance of the subject transmission line. See

177

EIS-0285-SA-118: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8: Supplement Analysis 8: Supplement Analysis EIS-0285-SA-118: Supplement Analysis Transmission System Vegetation Management Program, Holcomb-Naselle 115kV, Pacific County, Washington Vegetation Management along the Holcomb Naselle 115kV transmission line corridor from structure 1/1 through structure 21/10. BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridor. Approximately 21 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 1.0 miles of access road will be cleared using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Tower sites will be treated 30 feet from center of poles and or

178

EIS-0285-SA-119: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9: Supplement Analysis 9: Supplement Analysis EIS-0285-SA-119: Supplement Analysis Transmission System Vegetation Management Program, Snohomish-Murray No. 1 Transmission Line Bonneville Power Administration proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridor. Total right-of-way acreage is approximately 182.8 acres. Approximately 17 miles of access roads will be cleared. Approximately 136 tower sites will be treated. Bonneville Power Administration, Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-119) Snohomish-Murray No. 1 Transmission Line (January 2003) More Documents & Publications EIS-0285-SA-125: Supplement Analysis EIS-0285-SA-124: Supplement Analysis

179

EIS-0285-SA-115: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: Supplement Analysis 5: Supplement Analysis EIS-0285-SA-115: Supplement Analysis Transmission System Vegetation Management Program, Shelton-Fairmount # 1-4, Jefferson County, Washington Vegetation Management along the Shelton Fairmount # 1-4 230kV & 115kV transmission lines corridor from structure 34/3 through structure 60/2. BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridors. Approximately 26 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 1.5 miles of access roads will be cleared using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Tower sites will be treated 35

180

(DOE/EIS-0285-SA-104): Supplement Analysis for the Transmission System Vegetation Management Program FEIS - Lynch Creek Tap to LaGrande-Cowlitz No.1 8/21/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 1, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-104-Lynch Creek Tap to LaGrande-Cowlitz No. 1 James A. Jellison - TFO/Olympia Natural Resource Specialist Proposed Action: Vegetation Management for the Lynch Creek to LaGrande-Cowlitz No. 1 Location: Near the town of Eatonville, Pierce County Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridor. The right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 29 miles of access roads and corridor will be treated. Vegetation management is required

Note: This page contains sample records for the topic "right-of-way access roads" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Draft Supplement to the Environmental Statement Fiscal year 1976 Proposed Program : Facility Location Evaluation for Lake Isabella Service (Kamilche Substation) Study Area 75-12.  

SciTech Connect

The statement describes the environmental impacts resulting from the construction of a new substation near Shelton, Washington. Land requirements for the new substation would be approximately 1.5 acres and, depending on the final site location chosen, an access road ranging from 200 to 3000 feet would also be required. Alternative sites 1 and 3 would be located on existing right-of-way and would remove 1.5 acres from other potential uses; alternate sites 2 and 4 would remove 1/4 acre of private timberland from production and 1 acre of existing right-of-way from other potential uses. Disturbance to wildlife during construction and loss of habitat associated with the above land requirements will occur. Grading for the substation site and access road will result in increased erosion and potential sedimentation in local streams may occur. Noise impacts will occur during construction.

United States. Bonneville Power Administration.

1974-10-22T23:59:59.000Z

182

EIS-025-SA-106: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-SA-106: Supplement Analysis -SA-106: Supplement Analysis EIS-025-SA-106: Supplement Analysis Transmission System Vegetation Management Program -106 SnoKing Tap to Monroe-Samamish Line) within Snohomish County, Washington Vegetation Management along the SnoKing Tap to the Monroe-Samamish transmission line from structure 8/1 through structure 20/6. BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridor. The right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 12 miles of access roads will be cleared using selective and non-selective methods that include hand cutting, mowing and herbicide treatments.

183

EIS-0285-SA-108: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8: Supplement Analysis 8: Supplement Analysis EIS-0285-SA-108: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management along the Satsop-Aberdeen #2 230kV transmission line corridor from structure 1/1 through structure 11/5. BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridors. Approximately 11 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 0.8 miles of access roads will be cleared using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Tower sites will be treated using selective and non-selective

184

End of the road for Roadrunner  

NLE Websites -- All DOE Office Websites (Extended Search)

End of the road for Roadrunner End of the road for Roadrunner End of the road for Roadrunner Roadrunner, the first supercomputer to break the once-elusive petaflop barrier-one million billion calculations per second-will be decommissioned on Sunday, March 31. March 29, 2013 Roadrunner, the first supercomputer to break the once-elusive petaflop barrier-one million billion calculations per second-will be decommissioned on Sunday, March 31. Roadrunner will be decommissioned on March 31. Contact Kevin Roark Communications Office (505) 665-9202 Email Roadrunner got everyone thinking in new ways about how to build and use a supercomputer. Once the World's Fastest Supercomputer; Central to the Success of Stockpile Stewardship LOS ALAMOS, N. M., March 29, 2013-Roadrunner, the first supercomputer to

185

HCEI Road Map: 2011 Edition (Brochure)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Road Map Road Map 2011 Edition 2 www.hawaiicleanenergyinitiative.org The Hawaii Clean Energy Initiative (HCEI) was founded based on a Memorandum of Understanding (MOU) between the State of Hawaii and the U.S. Department of Energy on Jan. 28, 2008. Upon inception, the State and the Department worked to form a series of working groups incorporating a variety of stakeholders throughout the state, including local government, not-for-profit organizations, private sector companies, trade associations, Department of Defense representatives (including PACOM) and academic organizations, among others. These working groups form

186

HCEI Road Map: 2011 Edition (Brochure)  

NLE Websites -- All DOE Office Websites (Extended Search)

HCEI Road Map HCEI Road Map 2011 Edition 2 www.hawaiicleanenergyinitiative.org The Hawaii Clean Energy Initiative (HCEI) was founded based on a Memorandum of Understanding (MOU) between the State of Hawaii and the U.S. Department of Energy on Jan. 28, 2008. Upon inception, the State and the Department worked to form a series of working groups incorporating a variety of stakeholders throughout the state, including local government, not-for-profit organizations, private sector companies, trade associations, Department of Defense representatives (including PACOM) and academic organizations, among others. These working groups form

187

Web accessible image similarity measurements  

Science Conference Proceedings (OSTI)

Web accessible image similarity measurements. Background: There ... messages). Web Access to Image Similarity Measurements. ...

2013-04-16T23:59:59.000Z

188

The role of power line rights-of-way as an alternative habitat for declined mire butterflies  

E-Print Network (OSTI)

of s(t), and each row has 16s+L - 1 states, representing all possible waiting times to transmission the transmission is completed and the node moves at the next time slot to row s - 1(except if s was 1). If we adopt networking standards (e.g.. EEE 802.3 CSMAICD (ethemet) standard [14], IEEE 802.11 wireless LAN standard [15

Kotiaho, Janne S.

189

SUSTAINABILITY: A Central Principle for the Electric Utility Industry Available Through Vegetation Management on Transmission Rights-of-Way  

Science Conference Proceedings (OSTI)

Sustainability is a relatively new principle based on old ideals. Basic precepts of sustainability have guided human activity for as long as there has been society150making sure that what we do today does not negatively affect what people, particularly our children, can do in the future. Over the last 20 years, much has happened that has elevated sustainability as an important consideration for industry and for society. Society's interest in sustainability is causing organizations to use the concept as ...

2009-12-01T23:59:59.000Z

190

Evaluating the Potential to Develop New Greenhouse Gas Emission Offsets on Electricity Transmission System Rights-of-Way  

Science Conference Proceedings (OSTI)

This report is a final deliverable for a research project conceived and supported by EPRI. This project explored the potential technical feasibility of developing greenhouse gas (GHG) emissions offsets by implementing enhanced Integrated Vegetation Management (IVM) to enhance management of biomass vegetation growing on high-voltage electricity ...

2013-03-30T23:59:59.000Z

191

Alternative Fuels Data Center: Electric Vehicle (EV) Road User Assessment  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Road User Assessment System Pilot to someone by E-mail Road User Assessment System Pilot to someone by E-mail Share Alternative Fuels Data Center: Electric Vehicle (EV) Road User Assessment System Pilot on Facebook Tweet about Alternative Fuels Data Center: Electric Vehicle (EV) Road User Assessment System Pilot on Twitter Bookmark Alternative Fuels Data Center: Electric Vehicle (EV) Road User Assessment System Pilot on Google Bookmark Alternative Fuels Data Center: Electric Vehicle (EV) Road User Assessment System Pilot on Delicious Rank Alternative Fuels Data Center: Electric Vehicle (EV) Road User Assessment System Pilot on Digg Find More places to share Alternative Fuels Data Center: Electric Vehicle (EV) Road User Assessment System Pilot on AddThis.com... More in this section... Federal State Advanced Search

192

Classified road detection from satellite images based on perceptual organization  

Science Conference Proceedings (OSTI)

Extracting roads from satellite images is an important task in both research and practice. This work presents an improved model for road detection based on the principles of perceptual organization and classification fusion in human vision system (HVS). ...

J. Yang; R. S. Wang

2007-10-01T23:59:59.000Z

193

Loss of Cherished Places -- Place Character and Climate Change along Australia's Great Ocean Road  

E-Print Network (OSTI)

Change along Australia’s Great Ocean Road Ray Green The paceStudies along the Great Ocean Road The research discussedplace along Australia’s Great Ocean Road. 5 The road, in the

Green, Ray

2008-01-01T23:59:59.000Z

194

The State of the Region HAMPTON ROADS 2011  

E-Print Network (OSTI)

and Frank Batten Jr. Foundation Hampton Roads Chamber of Commerce R. Bruce Bradley Kaufman and Canoles Ramon

195

Campus Security 1951 East-West Road  

E-Print Network (OSTI)

Campus Security 1951 East-West Road Honolulu, Hawai`i 96822 Telephone: (808) 956-9293 Fax: (808 First Female Campus Security Captain Alberta J.K. Pukahi Brings Unique Perspectives to the Position (HONOLULU, HI, December 10, 2012) University of Hawai`i at Mnoa's Campus Security and Emergency Management

196

Road traffic model using distributed camera network  

Science Conference Proceedings (OSTI)

Traffic monitoring/prediction using a distributed camera network is presented in this paper. The activities on each road link are monitored and features are derived to identify the pattern. Then it is learnt, classified, predicted and communicated to ... Keywords: hidden Markov model, spatial interest points, spatial-temporal interest points, traffic classification, traffic prediction, traffic surveillance

S. Indu; Sankalp Arora; Santanu Chaudhury; Asok Bhattacharyya

2010-12-01T23:59:59.000Z

197

CX-006575: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6575: Categorical Exclusion Determination 6575: Categorical Exclusion Determination CX-006575: Categorical Exclusion Determination Fairview-Rogue Access Road Maintenance Project CX(s) Applied: B1.3 Date: 08/22/2011 Location(s): Coos County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to perform road maintenance activities along the access roads of the BPA Fairview-Rogue 230-kilovolt transmission line between Fairview Substation and State Highway 42. Approximately 8,800 feet of selected roads, which lay on and off of the BPA right-of-way (ROW), will be maintained as part of the proposed project. The proposed access road project is part of on-going operations and maintenance along this line and this work is proposed for 2011. DOCUMENT(S) AVAILABLE FOR DOWNLOAD

198

Alternative Fuels Data Center: Low-Speed Vehicle Access to Roadways  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Low-Speed Vehicle Low-Speed Vehicle Access to Roadways to someone by E-mail Share Alternative Fuels Data Center: Low-Speed Vehicle Access to Roadways on Facebook Tweet about Alternative Fuels Data Center: Low-Speed Vehicle Access to Roadways on Twitter Bookmark Alternative Fuels Data Center: Low-Speed Vehicle Access to Roadways on Google Bookmark Alternative Fuels Data Center: Low-Speed Vehicle Access to Roadways on Delicious Rank Alternative Fuels Data Center: Low-Speed Vehicle Access to Roadways on Digg Find More places to share Alternative Fuels Data Center: Low-Speed Vehicle Access to Roadways on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Low-Speed Vehicle Access to Roadways Low-speed vehicles may only be used on roads that have a posted speed limit

199

Alternative Fuels Data Center: Low-Speed Vehicle Access to Roadways  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Low-Speed Vehicle Low-Speed Vehicle Access to Roadways to someone by E-mail Share Alternative Fuels Data Center: Low-Speed Vehicle Access to Roadways on Facebook Tweet about Alternative Fuels Data Center: Low-Speed Vehicle Access to Roadways on Twitter Bookmark Alternative Fuels Data Center: Low-Speed Vehicle Access to Roadways on Google Bookmark Alternative Fuels Data Center: Low-Speed Vehicle Access to Roadways on Delicious Rank Alternative Fuels Data Center: Low-Speed Vehicle Access to Roadways on Digg Find More places to share Alternative Fuels Data Center: Low-Speed Vehicle Access to Roadways on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Low-Speed Vehicle Access to Roadways Low-speed vehicles may only operate on private and public roads and streets

200

Alternative Fuels Data Center: Low-Speed Vehicle Access to Roadways  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Low-Speed Vehicle Low-Speed Vehicle Access to Roadways to someone by E-mail Share Alternative Fuels Data Center: Low-Speed Vehicle Access to Roadways on Facebook Tweet about Alternative Fuels Data Center: Low-Speed Vehicle Access to Roadways on Twitter Bookmark Alternative Fuels Data Center: Low-Speed Vehicle Access to Roadways on Google Bookmark Alternative Fuels Data Center: Low-Speed Vehicle Access to Roadways on Delicious Rank Alternative Fuels Data Center: Low-Speed Vehicle Access to Roadways on Digg Find More places to share Alternative Fuels Data Center: Low-Speed Vehicle Access to Roadways on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Low-Speed Vehicle Access to Roadways Low-speed vehicles may not operate on roads with posted speed limits of

Note: This page contains sample records for the topic "right-of-way access roads" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Hierarchy decomposition for faster user equilibria on road networks  

Science Conference Proceedings (OSTI)

The road traffic of an entire day for a certain region can be understood as a flow with sources and sinks on the road network. Traffic has the tendency to evade regularly clogged roads and other bottlenecks, especially with modern on-board navigation ...

Dennis Luxen; Peter Sanders

2011-05-01T23:59:59.000Z

202

Studying (non-planar) road networks through an algorithmic lens  

Science Conference Proceedings (OSTI)

This paper studies real-world road networks from an algorithmic perspective, focusing on empirical studies that yield useful properties of road networks that can be exploited in the design of fast algorithms that deal with geographic data. Unlike previous ... Keywords: Voronoi diagrams, algorithmic lens, circle arrangements, disk neighborhood systems, multiscale-dispersed graphs, road networks, shortest paths

David Eppstein; Michael T. Goodrich

2008-11-01T23:59:59.000Z

203

CX-003085: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

085: Categorical Exclusion Determination 085: Categorical Exclusion Determination CX-003085: Categorical Exclusion Determination Boyer-Tillamook Number 1 Transmission Line Access Road Maintenance CX(s) Applied: B1.3 Date: 06/21/2010 Location(s): Tillamook County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to rebuild and/or repair existing access road and right-of-way (ROW) road in its Eugene Region that provides access to the Boyer-Tillamook Number 1 transmission line and ROW access for sites 3, 4, 6, 7, 9, 12 and 14 between mile/structure 9/3 and 24/5. Project work includes, but is not limited to: reshaping, grading and compacting existing road surfaces and turnouts; hauling, placing, and shaping of aggregate and Riprap; constructing or reconditioning of water

204

CX-006794: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Categorical Exclusion Determination 4: Categorical Exclusion Determination CX-006794: Categorical Exclusion Determination Naselle-Tarlett Nature Conservancy Access Road Funding CX(s) Applied: B1.13 Date: 09/12/2011 Location(s): Pacific County, Washington Office(s): Bonneville Power Administration In 2010, the Nature Conservancy (property owner), in accordance to agreements with Bonneville Power Administration (BPA), abandoned several sections of legal and usable access roads leading to BPA?s Nasselle-Tarlett 115-kilovolt transmission line corridor. The Nature Conservancy has constructed new, more environmentally friendly sections of access roads on their property to provide BPA alternate access the transmission line right-of-way and structures. BPA proposes to purchase easement rights and provide funding to partially cover construction costs of the new road

205

CX-005852: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

852: Categorical Exclusion Determination 852: Categorical Exclusion Determination CX-005852: Categorical Exclusion Determination Stegall-Wayside 230 Kilovolt Access Road Extension CX(s) Applied: B1.13 Date: 05/05/2011 Location(s): Dawes County, Wyoming Office(s): Western Area Power Administration-Rocky Mountain Region Western Power Administration plans to construct an extension of an existing access road between structures 111-1 and 111-2 on the Stegall-Wayside 230 kilovolt transmission line. This road construction will provide access for removal of previously felled hazard trees along the transmission line right-of-way on private land. The project will extend the existing access road to the south from its present terminus at structure 111-1 and terminate before reaching structure 111-2. DOCUMENT(S) AVAILABLE FOR DOWNLOAD

206

Microsoft Word - ATT I205 Burton Road CX.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2012 9, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Tim Murray Project Manager - TELP-TPP-3 Proposed Action: AT&T Fiber Addition North Bonneville-Ross No. 2 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.7 Fiber optic cable Location: Vancouver, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to allow AT&T to install an additional fiber optic line and vault within BPA's North Bonneville-Ross right-of-way easement and into an existing wireless communication facility. BPA has a commercial lease agreement with AT&T for co-location on its facilities and AT&T must request permission to update those facilities when they

207

Timber Road II | Open Energy Information  

Open Energy Info (EERE)

II II Jump to: navigation, search Name Timber Road II Facility Timber Road II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Horizon Wind Energy Developer Horizon Wind Energy Energy Purchaser American Electric Power Location Near Payne OH Coordinates 41.023524°, -84.717185° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.023524,"lon":-84.717185,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

208

EPA Energy Strategy For The Road Ahead  

NLE Websites -- All DOE Office Websites (Extended Search)

Strategy Strategy for the Road Ahead Scenario Thinking for Business Executives and Corporate Boards 2007 GBN Global Business Network * Energy Strategy for the Road Ahead Printed on 100% recycled paper Copyright 2007 Global Business Network, a member of the Monitor Group. The U.S. Environmental Protection Agency (U.S. EPA) and its ENERGY STAR ® Program supported this effort. We encourage readers to use and share the content of this report, with the understanding that it is the intellectual property of Global Business Network and U.S. EPA ENERGY STAR ® , and that full attribution is required. 101 Market Street, Suite 1000 * San Francisco, CA 94105 * Telephone: (415) 932-5400 * Fax: (415) 932-5401

209

Early Cook County Roads -- Part Two  

NLE Websites -- All DOE Office Websites (Extended Search)

Two Two Nature Bulletin No. 739 January 18, 1964 Forest Preserve District of Cook County Seymour Simon, President Roberts Mann, Conservation Editor EARLY COOK COUNTY ROADS -- PART TWO -- THE PLANK ROAD ERA For ten years after Chicago, with a population of 4,170, was chartered as a city in 1837, its commerce and growth were crippled by wretched transportation to and from the hinterlands. During many periods of each year it was surrounded and isolated by mud. To be sure, there were dirt thoroughfares in all directions, graded and drained as best they could in those days, but not surfaced. No one who has never experienced it can appreciate how gooey and gluey a black prairie soil can be when wet. A wagon's wheels often become solid cylinders of mud as wide as a bass drum.

210

A road map for implementing systems engineering  

SciTech Connect

Studies by academia, industry, and government indicate that applying a sound systems engineering process to development programs is an important tool for preventing cost and schedule overruns and performance deficiencies. There is an enormous body of systems engineering knowledge. Where does one start? How can the principles of systems engineering be applied in the Sandia environment? This road map is intended to be an aid to answering these questions.

Dean, F.F. [Sandia National Labs., Albuquerque, NM (United States). New Mexico Weapons Systems Engineering Center; Bentz, B.; Bahill, A.T. [Univ. of Arizona, Tucson, AZ (United States)

1997-02-01T23:59:59.000Z

211

Microsoft Word - CX-AlveyDistrict_2011WoodPoles_No1957_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2011 0, 2011 REPLY TO ATTN OF: KEP-Alvey SUBJECT: Environmental Clearance Memorandum Nick Wenzl John Carter Line Foreman III-TFE-Alvey Line Foreman I-TFE-Alvey Proposed Action: Wood pole replacements and minor access road maintenance along portions of the Eugene-Lane #1, Eugene-Alvey #2, and Hawkins-Alvey #1 transmission line rights-of- way (ROW) PP&A Project No: 1957 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities...for structures, rights of way, infrastructures such as roads, equipment... routine maintenance activities, corrective....are required to maintain...infrastructures...in a condition suitable for a facility to be used for its designated purpose. Location: The project area is located in Lane County, Oregon, in Bonneville Power

212

Microsoft Word - CX-FY11PascoDistrictWoodPoleReplacement_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2011 1, 2011 REPLY TO ATTN OF: KEPR-PASCO SUBJECT: Environmental Clearance Memorandum Toby Cossairt Lineman Foreman III - TFPF-PASCO Proposed Action: Wood pole replacement and minor access road maintenance along various transmission line rights-of-way (ROW) in the Pasco District. The following lines will have pole change-outs in 2011: Benton-Scooteney #1, Benton-Othello #1, Franklin-Hedges #1, Franklin-Walla Walla #1, Grandview-Red Mountain #1, Franklin-Badger Canyon #2, Kennewick Tap to Franklin- Badger Canyon #2, McNary-Franklin #2, and White Bluffs-Richland #1. Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads,

213

Microsoft Word - CX-KalispellTLMDistrictFY11WoodPoleReplacement_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cleareance Memorandum Cleareance Memorandum Michael Stolfus Lineman Foreman III - TFKF-Kalispell Kurt Marsh Lineman Foreman I - TFKF-Kalispell Proposed Action: Wood pole replacement and minor access road maintenance along various transmission line rights-of-way in Bonneville Power Administration's (BPA) Kalispell District. PP&A Project No: 1839 (Garrison-Anaconda #1), 1840 (Hot Springs-Rattlesnake #1), 1841 (Rattlesnake-Garrison #1), 1842 (Columbia Falls-Kalispell #1), 1843 (Kalispell-Kerr #1), 1844 (Libby-Bonners Ferry #1), 1845 (Columbia Falls-Trego #1) Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities...for structures, rights of way, infrastructures such as roads, equipment... routine maintenance activities, corrective....are required to maintain...infrastructures...in a

214

Microsoft Word - CX-NBendFY11WoodPolesWEND-TAHK_TAHK-RDSPT_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 REPLY TO ATTN OF: KEP-Alvey SUBJECT: Environmental Clearance Memorandum Andy Crosby Todd Stringer Line Foreman III - TFEP-North Bend Line Foreman I - TFEP-North Bend Proposed Action: Wood pole replacement and minor access road maintenance along the Wendson-Tahkenitch #1 and the Tahkenitch-Reedsport #1 transmission line rights-of-way. PP&A Project No: 1960 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads, equipment... routine maintenance activities, corrective....are required to maintain...infrastructures...in a condition suitable for a facility to be used for its designated purpose. Location: The project area is located in Lane and Coos counties, Oregon, in Bonneville Power

215

Microsoft Word - CX-EllensburgTLMDistrictFY11WoodPoleReplacement_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Clearance Memorandum Clearance Memorandum Terry Kugler Lineman Foreman III - TFWF-Schultz Joe Lauer Line Foreman I - TFWF-Schultz Proposed Action: Wood pole replacement and minor access road maintenance along portions of the Columbia-Valhalla #1 and #2 transmission line rights-of-way. PP&A Project No: 1851 (Columbia-Valhalla #1), 1852 (Columbia-Valhalla #2) Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities...for structures, rights of way, infrastructures such as roads, equipment... routine maintenance activities, corrective....are required to maintain...infrastructures...in a condition suitable for a facility to be used for its designed purpose. Location: The project area is located in Douglas and Chelan counties, Washington. Project

216

Microsoft Word - CX-FY11WenatcheeDistrictWoodPoleReplacement_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4, 2011 4, 2011 REPLY TO ATTN OF: KEPR-PASCO SUBJECT: Environmental Clearance Memorandum Terry Kugler Lineman Foreman III - TFWF-SCHULTZ Proposed Action: Wood pole replacement and minor access road maintenance along various transmission line rights-of-way (ROW) in the Wenatchee District. The following lines will have pole change-outs in 2011: Chandler Tap, Grandview-Red Mt. #1 and Midway-Moxee #1. Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads, equipment... routine maintenance activities, corrective....are required to maintain... infrastructures...in a condition suitable for a facility to be used for its designed purpose.

217

Microsoft Word - CX-FY10_Kalispell_District_Wood_Pole_Replacement_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2010 6, 2010 REPLY TO ATTN OF: KEPR-Bell-1 SUBJECT: Environmental Cleareance Memorandum Michael Stolfus Lineman Foreman III - TFKF-Kalispell Proposed Action: Wood pole replacement and minor access road maintenance along various transmission line right-of-ways in the Kalispell District PP&A Project No: 1536 (Columbia Falls-Kalispell #1), 1537 (Anaconda-Silver Bow #1), 1538 (Columbia Falls-Trego #1), 1541 (Libby-Bonners Ferry #1), 1542 (Rattlesnake-Garrison #1) Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads, equipment... routine maintenance activities, corrective....are required to maintain...infrastructures...in a

218

Access Grid - CECM  

E-Print Network (OSTI)

"The Access Grid (AG) is the ensemble of resources that can be used to support ... We shall also illustrate the basic capture capacities that Smart Technology's ...

219

Science Open Access Journals  

Office of Scientific and Technical Information (OSTI)

SOAJ allows the user to search multiple open access publications with a single query. Results are consolidated and returned in relevance-ranked order, and users are...

220

Role Based Access Control  

Science Conference Proceedings (OSTI)

... Nash and Poland [10] discuss the application of role based access control to cryptographic authentication devices commonly used in the banking ...

Note: This page contains sample records for the topic "right-of-way access roads" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Making VRML Accessible  

Science Conference Proceedings (OSTI)

... Paper - Making VRML Accessible for People with Disabilities by Sandy Ressler and Qiming Wang to Appear in Proceeding of ASSETS 98. ...

222

CX-003089: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CX-003089: Categorical Exclusion Determination CX-003089: Categorical Exclusion Determination CX-003089: Categorical Exclusion Determination Perform Routine Access Road Maintenance Within the Big Eddy-Ostrander Number 1 Transmission Line Corridor CX(s) Applied: B1.3 Date: 06/25/2010 Location(s): Hood River County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to perform routine road maintenance activities along existing access roads, both on and off the transmission line right-of-way (ROW). The maintenance includes: recurring maintenance to the roadbed and drainage, rerocking, blading, installing water bars, installing drain dips, and/or other minor light road improvements. All work will occur in areas previously disturbed during installation. The project area covers approximately 1.5 miles of road. The

223

Accessibility validation with RAVEN  

Science Conference Proceedings (OSTI)

Testing is, for most, a necessary evil in the software life cycle. One very important form of testing is the evaluation of software products according to mandated criteria or guidelines such as those that specify level of accessibility. Such evaluations ... Keywords: AOP, GUI, Java, accessibility, reflection, rich-client

Barry Feigenbaum; Michael Squillace

2006-05-01T23:59:59.000Z

224

Accessing HPSS at NERSC  

NLE Websites -- All DOE Office Websites (Extended Search)

Accessing HPSS Accessing HPSS Accessing HPSS Once you have successfully generated an HPSS token you can access NERSC's HPSS in the different ways listed below. HSI and HTAR are usually the best ways to transfer data in and out of HPSS but other methods are also included. Access Method When to use this method Features Limitations HSI When a full-featured unix-like interface is desired high performance (parallel); unix-like user interface; firewall mode client is specific to HPSS version and might not work at other sites; HTAR When you have large collections of smaller (~10MB or less) files high performance (parallel); creates a tar file directly in HPSS along with an index file; more efficient for large collections of file same client limitations as HSI; also does not have firewall mode so using on a remote site with a firewall will require modification of firewall rules

225

CX-006582: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

582: Categorical Exclusion Determination 582: Categorical Exclusion Determination CX-006582: Categorical Exclusion Determination Access Road Maintenance Along the McNary-Santiam 230-Kilovolt and Jones Canyon-Santiam 230-Kilovolt Transmission Line Corridors CX(s) Applied: B1.3 Date: 08/22/2011 Location(s): Wasco County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to perform routine road maintenance activities along existing access roads, both on and off the rights-of-way. The work involves approximately 5,000 linear feet of road reconstruction or improvement work. The roadwork is needed to improve access for crews that will be maintaining the transmission line and towers within the transmission line corridor. The work will consist primarily of

226

Microsoft Word - CX-Rattlesnake-Garrison and Garrison-Anaconda_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2010 6, 2010 REPLY TO ATTN OF: KEPR-Bell-1 SUBJECT: Environmental Cleareance Memorandum Ken Adamson Project Manager - TELF-TPP-3 Proposed Action: Improve existing access roads in mile 52 of the Rattlesnake-Garrison #1 transmission line and realign access roads in mile 7 and mile 8 of the Garrison-Anaconda #1 transmission line PP&A Project No.: PP&A 1660 Budget Information: 189796 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021):  B1.13 Construction, acquisition, and relocation of onsite pathways and short onsite access roads and railroads.  B1.3 Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads, equipment...routine maintenance activities, corrective....are required to

227

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

NLE Websites -- All DOE Office Websites (Extended Search)

Flaming Gorge to Vernal No. 1138-kV Transmission Line Structut·e Replacements Flaming Gorge to Vernal No. 1138-kV Transmission Line Structut·e Replacements Uintah County, Utah A. Brief Description of Pt·oposal: Western Area Power Administration (Western) proposes to replace structure 36/5 along its Flaming Gorge to Vernal No. I 138-kV Transmission Line. The work will occur along the transmission line access road in Uintah County, Utah, Township 5 South, Range 22 East, Sectiot} 22 of the Salt Lake Principle Meridian. The structure is a wood pole H-frame design and is located along a well-defined access road approximately 200 meters south of the access road junction with the North Sunshine Ranch road. The work would be conducted within Western's existing right-of-way and easements on lands administered by the U.S. Department oflnterior

228

The Road Ahead for Light Duty Vehicle Fuel Demand  

U.S. Energy Information Administration (EIA)

The Road Ahead for Light Duty Vehicle Fuel Demand Joanne Shore Energy Information Administration July 7, 2005 Refining Capacity Surplus Shrank As Demand Grew ...

229

Road to AC Voltage Standard Leads to Important Junction  

Science Conference Proceedings (OSTI)

Road to AC Voltage Standard Leads to Important Junction. ... Grumman in the mid-1990s.*** A number of innovations since then have led to the first ...

2013-08-13T23:59:59.000Z

230

Tyre parameter identification from road tests on a complete vehicle.  

E-Print Network (OSTI)

??Vehicle manufacturers notice a difference between the tyre behaviour observed in road tests with a complete vehicle and the behaviour of the tyre as provided… (more)

Lo Conte, D.

2010-01-01T23:59:59.000Z

231

Microsoft Word - CX-Ostrander-TroutdaleAccessRoadsFY12_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2012 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Todd Nicholson Supervisory Civil Engineer - TELF-TPP-3 Proposed Action: Ostrander-Troutdale No. 1,...

232

New, stricter Pajarito Road access rules to go into effect Aug...  

NLE Websites -- All DOE Office Websites (Extended Search)

most sensitive areas and now is restricted to those with a valid reason and badge to enter this area. No more "vouching" for family members LOS ALAMOS, N.M., July 16, 2013-Los...

233

GRR/Section 19 - Water Access & Water Rights Overview | Open Energy  

Open Energy Info (EERE)

- Water Access & Water Rights Overview - Water Access & Water Rights Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19 - Water Access & Water Rights Overview 19WaterAccessWaterRightsOverview.pdf Click to View Fullscreen Triggers None specified Click "Edit With Form" above to add content 19WaterAccessWaterRightsOverview.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative A developer may require water for such uses as dust suppression for roads, construction activities, drilling operations, extraction of geothermal resources, plant cooling operations, etc. Water access and water rights are predominantly handled by state law.

234

The Broadband Access Facility  

Science Conference Proceedings (OSTI)

The deployment of broadband access networks will revolutionise many aspects of society in the early years of the next millennium. Manufacturers, telecommunications providers and cable television operators world-wide are investing heavily on research ...

J. Kelly; R. Adnams; M. Enrico; M. Whittle

2000-01-01T23:59:59.000Z

235

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Routine Maintenance of Hesperus-Montrose 345-kV Transmission Line Access Roads Routine Maintenance of Hesperus-Montrose 345-kV Transmission Line Access Roads San Miguel, Ouray, Montrose, Montezuma, La Plata, and Dolores Counties, Colorado A. Brief Description of Proposal: Western Area Power Administration (Western) proposes to perform routine maintenance of existing access roads and right-of-way (ROW) along the Hesperus-Montrose (HSP-MTR) 345-kilovolt (kV) transmission line to safely access structures 64, 67, 81, 82, 93, 97, 99, 100, 122, 125, and 143 (approximately 20 miles). The project is located on private, U.S. Bureau of Land Management (BLM), and U.S. Forest Service (USFS) lands in San Miguel, Ouray, Montrose, Montezuma, La Plata, and Dolores Counties, Colorado. Routine maintenance actions proposed for HSP-MTR 345-kV transmission line include the

236

Institutional perspectives on road pricing : essays on implementation, response, and adaptation  

E-Print Network (OSTI)

Road pricing involves charging road users a fee for the external social costs of using private vehicles. These costs typically remain unaccounted for in routine road transport operations and benefit-cost analyses. They ...

Mahendra, Anjali, 1977-

2008-01-01T23:59:59.000Z

237

METRo: A New Model for Road-Condition Forecasting in Canada  

Science Conference Proceedings (OSTI)

A numerical model to forecast road conditions, Model of the Environment and Temperature of Roads (METRo), has been developed to run at Canadian weather centers. METRo uses roadside observations from road weather information systems stations as ...

Louis-Philippe Crevier; Yves Delage

2001-11-01T23:59:59.000Z

238

Exact Routing in Large Road Networks Using Contraction Hierarchies  

Science Conference Proceedings (OSTI)

Contraction hierarchies are a simple approach for fast routing in road networks. Our algorithm calculates exact shortest paths and handles road networks of whole continents. During a preprocessing step, we exploit the inherent hierarchical structure ... Keywords: algorithm engineering, route planning, shortest paths

Robert Geisberger; Peter Sanders; Dominik Schultes; Christian Vetter

2012-08-01T23:59:59.000Z

239

Effective map-matching on the most simplified road network  

Science Conference Proceedings (OSTI)

The effectiveness of map-matching algorithms highly depends on the accuracy and correctness of underlying road networks. In practice, the storage capacity of certain hardware, e.g. mobile devices and embedded systems, is sometimes insufficient to maintain ... Keywords: GPS, map-matching, simplified road network

Kuien Liu; Yaguang Li; Fengcheng He; Jiajie Xu; Zhiming Ding

2012-11-01T23:59:59.000Z

240

A Numerical Model for Prediction of Road Temperature and Ice  

Science Conference Proceedings (OSTI)

A numerical model for the prediction of road temperature and ice has been tested on data from a Danish road station. The model is based on the solution of the equation of heat conduction in the ground and the surface energy-balance equation.

Bent H. Sass

1992-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "right-of-way access roads" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

13th Annual Transportation Engineering and Road Research Alliance (TERRA)  

E-Print Network (OSTI)

13th Annual Sponsor: Transportation Engineering and Road Research Alliance (TERRA) Cosponsors: Minnesota Department of Transportation (Mn/DOT) Minnesota Local Technical Assistance Program (LTAP Association State Aid for Local Transportation, Mn/DOT Minnesota Local Road Research Board (LRRB) Pavement

Minnesota, University of

242

Microsoft Word - CX-Keeler-OregonCity_Access_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Shelley Fenton Shelley Fenton Realty Specialist - TERR-3 Proposed Action: Bonneville Power Administration (BPA) proposes to grant the Murray Hill Recreation Association permission to cross the BPA right-of-way on the Keeler-Oregon City No. 2, 115-kilovolt (kV) corridor between Tower 14/4 and Tower 14/6+250. PP&A Project No.: PP&A 2023 Budget Information: N/A Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.9 Grant or denial of requests for multiple use of a transmission facility rights-of-way, such as grazing permits and crossing agreements, including electric lines, water lines, and drainage culverts. Location: Section 32; Township 1 South; Range 1 West; Willamette Meridian; Washington County, Oregon Proposed by: BPA

243

Climate policies for road transport revisited (I): Evaluation of the  

Open Energy Info (EERE)

Climate policies for road transport revisited (I): Evaluation of the Climate policies for road transport revisited (I): Evaluation of the current framework Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Climate policies for road transport revisited (I): Evaluation of the current framework Agency/Company /Organization: Elsevier Complexity/Ease of Use: Not Available Website: www.pik-potsdam.de/members/edenh/publications-1/CPFRTRI.pdf Related Tools Alternative Fuels and Advanced Vehicles Data Center - Codes and Standards Resources Reducing Congestion through Smart Parking Management Performance Measurement in the Road Sector: A Cross-Country Review of Experience ... further results Find Another Tool FIND TRANSPORTATION TOOLS This paper evaluates the effectiveness and efficiency of current climate policies for road transport that (1) target fuel producers and/or car

244

Carbon Capture and Storage Road Map | Open Energy Information  

Open Energy Info (EERE)

and Storage Road Map and Storage Road Map Jump to: navigation, search Name Carbon Capture and Storage Road Map Agency/Company /Organization Asian Development Bank Sector Energy Focus Area Renewable Energy, Economic Development, Greenhouse Gas, Industry Topics Adaptation, Implementation, Low emission development planning, -LEDS Website http://www.adb.org/news/adb-he Country China Eastern Asia References ADB Helps People's Republic of China Plan Carbon Capture and Storage Road Map[1] Program Overview "The Asian Development Bank (ADB) is assisting the People's Republic of China (PRC) in the development of a road map for carbon capture and storage (CCS) to help achieve the country's carbon dioxide (CO2) emissions reduction goals. ADB will assist the PRC in developing a detailed plan for a staged

245

DOE Issues Environmental Assessment on Road Project for Public Review  

NLE Websites -- All DOE Office Websites (Extended Search)

Brad Bugger (208) 526-0833 DOE Issues Environmental Assessment on Road Project for Public Review Brad Bugger (208) 526-0833 DOE Issues Environmental Assessment on Road Project for Public Review The U.S. Department of Energy has issued for public review and comment a draft environmental assessment of the potential environmental impacts of building an internal road to safely ship radioactive material within the Idaho National Laboratory. DOE�s preferred alternative under the environmental assessment is to develop a new, internal road that would connect the Idaho Nuclear Technology and Engineering Center with the Materials and Fuels Complex, a distance of about 20 miles. It would allow the INL to safely ship nuclear materials from the Idaho Nuclear Technology and Engineering Center and the Materials and Fuels Complex without having to utilize public roads, like Highway 20, which adds additional cost and security considerations to each shipment.

246

Windshield Wilderness: Cars, Roads, and Nature in Washington’s National Parks  

E-Print Network (OSTI)

Review: Windshield Wilderness: Cars, Roads, and Nature inLouter. Windshield Wilderness: Cars, Roads, and Nature inpost-consumer waste. “Cars, not people, are the parks’

Anderson, Byron

2006-01-01T23:59:59.000Z

247

EA-1755: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1755: Final Environmental Assessment EA-1755: Final Environmental Assessment EA-1755: Final Environmental Assessment Reconstruction of the South Access Road (CR 802) in Support of the Department of Energy, Waste Isolation Pilot Plant in Eddy County, New Mexico The DOE CBFO, is requesting a right-of-way (ROW) that consists of reconstructing the existing south access road (SAR) - currently maintained by the County as CR 802 - and widening the driving prism and ROW width to accommodate WIPP haulage trucks, and improve the overall quality of the current road condition. In addition, a construction lay down yard is being proposed, to be converted into a rallying point upon completion of the road construction. The proposed action is sought to fill the need of having a second route to the WIPP for waste haulage activities via a southerly

248

CX-003090: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

90: Categorical Exclusion Determination 90: Categorical Exclusion Determination CX-003090: Categorical Exclusion Determination Perform Routine Access Road Maintenance within the McNary-Ross Number 1 Transmission Line Corridor CX(s) Applied: B1.3 Date: 06/15/2010 Location(s): Klickitat County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to perform routine road maintenance activities along existing access roads, both on and off (Ha-o-AR-125-1, 125-2, BC-AR-32) the transmission line right-of-way (ROW). The maintenance includes: recurring maintenance to the roadbed and drainage, rerocking, blading, installing water bars, installing drain dips, and/or other minor light road improvements. All work will occur in areas previously disturbed during installation. The project area covers

249

CX-010728: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10728: Categorical Exclusion Determination 10728: Categorical Exclusion Determination CX-010728: Categorical Exclusion Determination Longview-Chehalis No. 1 and No. 3, and Lexington-Longview No. 1 Access Roads Maintenance CX(s) Applied: B1.3 Date: 08/22/2013 Location(s): Washington Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to perform routine road maintenance including reconstructing, grading, and shaping of roads, placing and compacting of rock surfacing, installation and maintenance of erosion control and water drainage features, and restoration of disturbed areas along existing access roads, both on and off the right-of-way (ROW). CX-010728.pdf More Documents & Publications CX-008708: Categorical Exclusion Determination CX-008693: Categorical Exclusion Determination

250

Microsoft Word - FEIS-0285-SA-452-Ross-StJohns-PPA2108_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2011 8, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS- 0285/SA-452 Ross-St. Johns No. 1) PP&A Project #2108 Ed Tompkins Natural Resource Specialist - TFBV-LMT Proposed Action: Vegetation management and access road maintenance activities along the entire right-of-way (ROW) corridors and associated access roads Location: Clark County, Washington and Multnomah County, Oregon, in the Longview District Proposed by: Bonneville Power Administration (BPA) Description of the Proposal: BPA proposes to clear unwanted vegetation along and adjacent to the transmission line corridor and access roads of the 230-kV Ross-St. Johns No. 1 transmission line corridor from Ross Substation to St. Johns Substation. Other lines that are present within

251

Review: A review of surface erosion and sediment delivery models for unsealed roads  

Science Conference Proceedings (OSTI)

This paper reviews available models for estimating surface erosion and sediment delivery to streams from unsealed roads. It summarises current progress and identifies directions for ongoing research and model development. The paper provides a framework ... Keywords: Modelling, Road drainage, Road erosion, Sediment, Sediment delivery, Unsealed road

Baihua Fu; Lachlan T. H. Newham; C. E. Ramos-Scharrón

2010-01-01T23:59:59.000Z

252

Dillard Road Solar Power Facility | Open Energy Information  

Open Energy Info (EERE)

Dillard Road Solar Power Facility Dillard Road Solar Power Facility Jump to: navigation, search Name Dillard Road Solar Power Facility Facility Dillard Road Solar Power Facility Sector Solar Facility Type Photovoltaics Facility Status In Service Developer Recurrent Energy Energy Purchaser Sacramento Municipal Utility District Location Elk Grove, California Coordinates 38.465275°, -121.17847° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.465275,"lon":-121.17847,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

253

End of the road for Roadrunner | National Nuclear Security Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

End of the road for Roadrunner | National Nuclear Security Administration End of the road for Roadrunner | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > End of the road for Roadrunner End of the road for Roadrunner Posted By Office of Public Affairs This weekend, Roadrunner, the World's Fastest Supercomputer from 2008, will be switched off but not be forgotten.

254

One Woman's Road to Recovery | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

One Woman's Road to Recovery One Woman's Road to Recovery One Woman's Road to Recovery October 19, 2010 - 6:04pm Addthis One Woman's Road to Recovery Jo Napolitano Media Specialist, Argonne National Laboratory Editor's Note: Cross-posted from Argonne National Lab's Portraits of ARRA. Rebecca Bivens, who worked for a major oil company for seven years before she was laid off in January 2008, was elated to land a job that summer at one of the world's largest equipment manufacturers. That is, until the company laid off her entire division the night before Christmas Eve. "No one saw it coming," said Bivens, who spent years working in safety and procurement. "Just the month before, they said we were doing great. After losing two jobs in a year, it was pretty depressing. It was scary."

255

End of the road for Roadrunner | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

End of the road for Roadrunner | National Nuclear Security Administration End of the road for Roadrunner | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > End of the road for Roadrunner End of the road for Roadrunner Posted By Office of Public Affairs This weekend, Roadrunner, the World's Fastest Supercomputer from 2008, will be switched off but not be forgotten.

256

Marsh Road Power Plant Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Marsh Road Power Plant Biomass Facility Marsh Road Power Plant Biomass Facility Jump to: navigation, search Name Marsh Road Power Plant Biomass Facility Facility Marsh Road Power Plant Sector Biomass Facility Type Landfill Gas Location San Mateo County, California Coordinates 37.4337342°, -122.4014193° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.4337342,"lon":-122.4014193,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

257

One Woman's Road to Recovery | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

One Woman's Road to Recovery One Woman's Road to Recovery One Woman's Road to Recovery October 19, 2010 - 6:04pm Addthis One Woman's Road to Recovery Jo Napolitano Media Specialist, Argonne National Laboratory Editor's Note: Cross-posted from Argonne National Lab's Portraits of ARRA. Rebecca Bivens, who worked for a major oil company for seven years before she was laid off in January 2008, was elated to land a job that summer at one of the world's largest equipment manufacturers. That is, until the company laid off her entire division the night before Christmas Eve. "No one saw it coming," said Bivens, who spent years working in safety and procurement. "Just the month before, they said we were doing great. After losing two jobs in a year, it was pretty depressing. It was scary."

258

Candidate sets for alternative routes in road networks  

Science Conference Proceedings (OSTI)

We present a fast algorithm with preprocessing for computing multiple good alternative routes in road networks. Our approach is based on single via node routing on top of Contraction Hierarchies and achieves superior quality and efficiency compared to ...

Dennis Luxen; Dennis Schieferdecker

2012-06-01T23:59:59.000Z

259

The Road Ahead for Light Duty Vehicle Fuel Demand  

Gasoline and Diesel Fuel Update (EIA)

Energy Information Administration Logo. If you need assistance viewing this page, please call (202) 586-8800 The Road Ahead for Light Duty Vehicle Fuel Demand Click here to start...

260

New priorities for old roads : re-thinking roadway preservation  

E-Print Network (OSTI)

Most of the roads built over the last century in the US were built assuming that efficient mobility for drivers was most important without considering impacts to the natural or built environment. Urban neighborhoods were ...

Sylvester, Kathleen R. (Kathleen Rynn)

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "right-of-way access roads" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Valuation of the Indiana Toll Road and Chicago Skyway privatizations  

E-Print Network (OSTI)

This thesis analyzes the economics and financing of the recent purchases of the Indiana Toll Road and Chicago Skyway. Similar privatizations have been occurring around the world, but the economic motive for such transactions ...

Chaudary, Faiza A. (Faiza Arshad)

2010-01-01T23:59:59.000Z

262

On Road Fuel Economy Performance of Hybrid Electric Vehicles  

NLE Websites -- All DOE Office Websites (Extended Search)

Road Fuel Economy Performance of Hybrid Electric Vehicles Lee Slezak Office of FreedomCAR and Vehicle Technologies U.S. Department of Energy Jim Francfort Advanced Vehicle Testing...

263

U.S. Virgin Islands Energy Road Map: Analysis  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Road Map: Analysis Eric Lantz, Dan Olis, and Adam Warren Technical Report NRELTP-7A20-52360 September 2011 NREL is a national laboratory of the U.S. Department of Energy,...

264

State of roads : public works as research, India circa 1960  

E-Print Network (OSTI)

That the road is a symbol of the prowess of the nation-state seems tautological, a uni"ed phenomenon of political symbolism that manifests as an infrastructural network. When subjected to a close historical examination, ...

Khorakiwala, Ateya A

2009-01-01T23:59:59.000Z

265

Road Transportable Analytical Laboratory system. Phase 1  

SciTech Connect

This developmental effort clearly shows that a Road Transportable Analytical Laboratory System is a worthwhile and achievable goal. The RTAL is designed to fully analyze (radioanalytes, and organic and inorganic chemical analytes) 20 samples per day at the highest levels of quality assurance and quality control. It dramatically reduces the turnaround time for environmental sample analysis from 45 days (at a central commercial laboratory) to 1 day. At the same time each RTAL system will save the DOE over $12 million per year in sample analysis costs compared to the costs at a central commercial laboratory. If RTAL systems were used at the eight largest DOE facilities (at Hanford, Savannah River, Fernald, Oak Ridge, Idaho, Rocky Flats, Los Alamos, and the Nevada Test Site), the annual savings would be $96,589,000. The DOE`s internal study of sample analysis needs projects 130,000 environmental samples requiring analysis in FY 1994, clearly supporting the need for the RTAL system. The cost and time savings achievable with the RTAL system will accelerate and improve the efficiency of cleanup and remediation operations throughout the DOE complex.

Finger, S.M.; Keith, V.F.; Spertzel, R.O.; De Avila, J.C.; O`Donnell, M.; Vann, R.L.

1993-09-01T23:59:59.000Z

266

Access Grid | Argonne National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

Access Grid Access Grid Access Grid The Access Grid is the ensemble of resources that can be used to support human interaction across the grid. It consists of multimedia display, presentation and interactive environments, interfaces to grid middleware, and interfaces to visualization environments. The Access Grid will support large-scale distributed meetings, collaborative work sessions, seminars, lectures, tutorials and training. The Access Grid design point is group-to-group communication (thus differentiating it from desktop to desktop based tools that focus on individual communication). The Access Grid environment must enable both formal and informal group interactions. Large-format displays integrated with intelligent or active meeting rooms are a central feature of the Access Grid nodes. Access Grid nodes are

267

Non-Road Electric Vehicle Emissions: Analysis and Recommendations  

Science Conference Proceedings (OSTI)

Energy security and quality of life in the United States and around the globe are dependent upon the reduction of air pollution, petroleum dependency, and developing a solution to global warming. Non-road transportation equipment offers an opportunity to support this quality of life objective with a reduction in emissions through electrification. Private sector initiatives and regulatory agencies have begun to focus on non-road vehicles and equipment. This emission source category, which was largely unre...

2003-08-18T23:59:59.000Z

268

EIS-0285-SA-141: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Supplement Analysis 1: Supplement Analysis EIS-0285-SA-141: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management for the Salem Albany #2 115 kV transmission line from Salem Substation to Albany Substation. BPA proposes to remove unwanted vegetation along the right-of-way, access roads, switch platforms, microwave beam paths, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation.

269

EIS-0285-SA-27: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Supplement Analysis 7: Supplement Analysis EIS-0285-SA-27: Supplement Analysis Transmission System Vegetation Management Program, Eugene Region Vegetation Management along the Marion-Alvey #1 from structure 14/5 to 64/3 and the Marion-Lane #1 from structure 14/5 to 70/2. Both lines describe the same segment of ROW between structures 14/5 and 45/2. BPA proposes to clear unwanted vegetation in the rights-of-ways, around tower structures, and associated access roads that may impede the operation and maintenance of the subject transmission line. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the

270

EIS-0285-SA-137: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Supplement Analysis 7: Supplement Analysis EIS-0285-SA-137: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management for the Chemawa-Salem #1 115 kV and #2 230 kV transmission lines from Chemawa Substation to Salem Substation. BPA proposes to remove unwanted vegetation along the right-of-way, access roads, switch platforms, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have lowgrowing plant communities along the rights-of-way to control the development of potentially threatening vegetation.

271

Pinal County, Arizona. ' RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

~ '1 Categorical Exclusion for vegetation removal under existing Saguaro-Tucson 115-kV right-of-way between structures 5/3 thru 6/3 Pinal County, Arizona. ' RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to remove vegetation under its existing Saguaro-Tucson 115-kV transmission line, within Western's existing right-of-way between Structures 5/3 and 6/3 in Pinal County, Arizona. We plan on using existing access roads to the vegetation removal areas. Western will be using a front-end loader with a cutting & shredding attachment to remove the vegetation. This work is necessary to maintain the safety and reliability of the bulk electrical system. The attached map shows the project area on private land situated within Section 25

272

Pinal County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINA nON  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

danger tree danger tree removal under existing Rogers-Coolidge 230-kV right-of-way between structures 35/4 & 36/2 on the Gila River Indian Reservation Pinal County, Arizona . ' RECORD OF CATEGORICAL EXCLUSION DETERMINA nON A. Proposed Action: Western proposes to cut down 4 Palo Verde trees using hand tools, under our existing Rogers-Coolidge 230-kV transmission line, within Western's existing right-of-way between Structures 35/4 and 36/2 on the Gila River Indian Reservation, Pinal County, Arizona. Western will be using pickup trucks along the existing access road located west of the transmission line to bring personnel and equipment to the work areas. This work is necessary to maintain the safety and reliability of the bulk electrical system. The attached map shows the project area situated within Section 21 of Township 4

273

EIS-0285-SA-11: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0285-SA-11: Supplement Analysis EIS-0285-SA-11: Supplement Analysis EIS-0285-SA-11: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management along the Covington-Maple Valley No. 2 Transmission Line ROW. BPA proposes to clear unwanted vegetation in the rights-of- ways and around tower structures that may impede the operation and maintenance of the subject transmission line. Also, access road clearing will be conducted. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of- way to control the

274

(DOE/EIS-0285/SA-110): Supplement Analysis for the Transmission System Vegetation Management Program FEIS-Covington-Columbia No. 3) 10/2/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS DOE/EIS-0285/SA-110-Covington-Columbia No. 3 Don Atkinson - TFN/Snohomish Proposed Action: Vegetation Management along the Covington-Columbia No. 3, 230kV transmission lines from structure 1/1 through structure 12/1. Corridor width varies from 150 feet to 537.5 feet. The project area is located within King County, Washington. Location: The project area is located within King County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridor. Approximately 568.4 acres of the right-of-way will be treated using selective and non-selective methods that include

275

EIS-0285-SA-122: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: Supplement Analysis 2: Supplement Analysis EIS-0285-SA-122: Supplement Analysis Transmission System Vegetation Management Program BPA proposes to remove unwanted vegetation along the right-of-way, along access roads and around tower structures along the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation. Supplement Analysis for the Transmission System Vegetation Management

276

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-149-Captain Jack-Malin #1)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2003 8, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-149-Captain Jack-Malin #1) Elizabeth Johnson Natural Resource Specialist - TFR/The Dalles Proposed Action: Vegetation Management for the Captain Jack-Malin #1 500 kV transmission line from structure 2/4 to Malin Substation (reference line). Right of way width averages 150 feet. Location: The project location is within Klamath County, Oregon near the city of Malin, and is within the Redmond Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridors.

277

(DOE/EIS-0285/SA-105): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (08/22/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 105 Elbe Tap to Alder-LaGrande No. 1 James Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Elbe Tap to Alder-LaGrande No.1 and 115kV transmission line from structure 1/1 through structure 7/17. Corridor width varies. The project area is located within Whatcom County, Washington. Location: Transmission line is located at and west of Elbe, Pierce County Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridor. The right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing

278

EA-1697: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Assessment Final Environmental Assessment EA-1697: Final Environmental Assessment Right-of-Way Maintenance in the San Joaquin Valley, California This Environmental Assessment (EA) evaluates environmental impacts of the Proposed Action (San Joaquin Valley Right-of-Way Maintenance Project) and the No Action Alternative. Western's San Joaquin Valley ROW Maintenance Program serves to update the existing O&M Program to include all transmission lines, associated legal access roads, substations, and the maintenance facility into one comprehensive Master O&M Program. The Master O&M Program would include additional maintenance activities that are outside the scope of the previous biological opinion and PA, particularly the use of herbicides in some areas. This EA provides information for further ESA and

279

(DOE/EIS-0285/SA-13): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 6/6/01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3) 3) James Jellison - TFO/Olympia Region - Natural Resource Specialist Bill Erickson - TFP/Walla Walla Region - Natural Resource Specialist Proposed Action: Vegetation Management along the Naselle Tarlett #1 and #2 transmission line Right of Way (ROW). Location: The ROW is located in Pacific County, WA, Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. Also, access road clearing will be conducted. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of

280

EA-1697: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1697: Final Environmental Assessment EA-1697: Final Environmental Assessment EA-1697: Final Environmental Assessment Right-of-Way Maintenance in the San Joaquin Valley, California This Environmental Assessment (EA) evaluates environmental impacts of the Proposed Action (San Joaquin Valley Right-of-Way Maintenance Project) and the No Action Alternative. Western's San Joaquin Valley ROW Maintenance Program serves to update the existing O&M Program to include all transmission lines, associated legal access roads, substations, and the maintenance facility into one comprehensive Master O&M Program. The Master O&M Program would include additional maintenance activities that are outside the scope of the previous biological opinion and PA, particularly the use of herbicides in some areas. This EA provides information for further ESA and

Note: This page contains sample records for the topic "right-of-way access roads" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

DOE/EIS-0285-SA-138: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (Raver-Echo Lake #1) (4/3/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 (Raver-Echo Lake #1 8 (Raver-Echo Lake #1 Don Atkinson Natural Resource Specialist - TFN/SNOHOMISH Proposed Action: Vegetation Management for portion of the Raver - Echo Lake #1 500 kV transmission line located from tower structure 4/1 to 13/1. Location: Project location is within King County, Washington and is within the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to clear targeted vegetation within the right-of- way. BPA proposes to clear along access roads and remove danger trees outside the right-of-way where appropriate. Project is to remove vegetation that may impede the operation and maintenance of the subject transmission line. See Section 1.1 through 1.4 of the attached checklists for a complete description of the proposed action.

282

EA-1863: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1863: Draft Environmental Assessment Glen Canyon to Pinnacle Peak 345 kV Transmission Lines Vegetation Management Project within the Coconino National Forest Flagstaff, Arizona Comment Period Ends: 12/29/11 For more information, contact: Ms. Linette King Electronic mail: lking@wapa.gov The Glen Canyon to Pinnacle Peak 345 kV vegetation management and right-of-way maintenance project (Project) serves to update the existing operation and maintenance program to include all transmission facilities and access roads into one comprehensive and proactive vegetation management and right-of-way maintenance program (Program). This environmental assessment (EA) analyzes the potential environmental consequences of the proposed Project, as required under the National

283

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-11)  

Science Conference Proceedings (OSTI)

BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. Also, access road clearing will be conducted. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation. This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and Record of Decision (ROD).

N /A

2001-05-15T23:59:59.000Z

284

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-13)  

SciTech Connect

BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. Also, access road clearing will be conducted. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation. This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and Record of Decision (ROD).

N /A

2001-06-06T23:59:59.000Z

285

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-12)  

Science Conference Proceedings (OSTI)

BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. Also, access road clearing will be conducted. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation. This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and Record of Decision (ROD).

N /A

2001-05-15T23:59:59.000Z

286

EIS-0285-SA-43: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

85-SA-43: Supplement Analysis 85-SA-43: Supplement Analysis EIS-0285-SA-43: Supplement Analysis Transmission System Vegetation Management Program BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission lines and access roads, including Reclaim and Danger Trees. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation. All work will be executed in accordance with the National Electrical Safety Code and BPA standards. A follow-up

287

EIS-0285-SA-38: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0285-SA-38: Supplement Analysis EIS-0285-SA-38: Supplement Analysis EIS-0285-SA-38: Supplement Analysis Transmission System Vegetation Management Program Bonneville Power Administration (BPA) proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission lines and access roads, including Reclaim and Danger Trees. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation. All work will be executed in accordance with the National Electrical Safety Code and BPA

288

EIS-0285-SA-140: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

40: Supplement Analysis 40: Supplement Analysis EIS-0285-SA-140: Supplement Analysis Transmission System Vegetation Management Program, Salem-Albany Bonneville Power Administration (BPA) proposes to remove unwanted vegetation along the right-of- way, access roads, switch platforms, microwave beam paths, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation. Supplement Analysis for the Transmission System Vegetation Management

289

ARCS – Access Rate Control System  

protected steel housing. ... Access Rate Control System This rugged, maintenance- ... Y-12 is seeking an industry partner to fully com-

290

Topic: Emergency Egress and Access  

Science Conference Proceedings (OSTI)

Topic: Emergency Egress and Access. Fire Research Seminar Series. NIST WTC Recommendations Are Basis for New Set of Revised Codes. ...

2012-08-20T23:59:59.000Z

291

Open Access Transmission Tariff  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission | OATT Transmission | OATT Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Western Open Access Transmission Service Tariff Revision Western Area Power Administration submitted its revised Open Access Transmission Service Tariff with the Federal Energy Regulatory Commission on Sept. 30, 2009. The tariff became effective on Dec. 1, 2009, as modified by Western's March 2, 2011 compliance filing. The revised tariff was developed to comply with FERC Order No. 890 and to be consistent with Western's statutory and regulatory requirements. It addresses changes in transmission services and planning. FERC issued an order on Dec. 2, 2010, granting Western's petition for a Declaratory Order approving the tariff as an acceptable reciprocity tariff, subject to Western making a compliance filing within 30 days to address items in Attachment C, Attachment P and Attachment Q. Western made its compliance filing on March 2, 2010, addressing FERC's Dec. 2, 2010, order. FERC accepted Western's March 2, 2011 compliance filing on April 25, 2011. Western has made several ministerial filings to its OATT as part of FERC's eTariff viewer system, the last of these was approved on March 29, 2013. Further detail can be found in the links below.Current OATT

292

Mitigation Action Plan for the McNary-John Day Transmission Line Project,(DOE/EIS-0332)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Measures Adopted Measures Adopted for the McNary-John Day Transmission Line Project Land Use and Recreation Locate towers and roads so as not to disrupt irrigation circles, where possible. Locate structures and roads outside of agricultural fields, orchards, and vineyards, where possible. Coordinate with landowners for farm operations, including plowing, crop dusting, and harvesting. Redesign irrigation equipment and compensate landowner for additional reasonable costs where new right-of-way needs to be acquired. Compensate farmers for crop damage and restore compacted soils. Control weeds around the base of the towers. Keep gates and fences closed and in good repair to contain livestock. Repair damages to access roads caused by or arising out of Bonneville use, leaving roads in good or better

293

Microsoft Word - CX-Cougar-Thurston_FY10_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alvey Alvey SUBJECT: Environmental Clearance Memorandum Ken Adamson Project Manager - TELD-TTP-3 Proposed Action: Improvement of access roads on the Cougar-Thurston #1 115-kV and the Thurston-McKenzie #1 115-kV transmission lines PP&A Project No.: 1679 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads, equipment... routine maintenance activities, corrective...are required to maintain...infrastructures...in a condition suitable for a facility to be used for its designated purpose. Location: The project is located in Lane County, Oregon, in the Eugene District. The project activities will be conducted on the access roads leading to towers: 10\2-11\3, 11\6-14\5, 28\4-

294

CX-001180: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1180: Categorical Exclusion Determination 1180: Categorical Exclusion Determination CX-001180: Categorical Exclusion Determination Monroe-Custer Number 1 and 2 500-Kilovolt Transmission Line Structure 16/2 Access Road Improvement and Bridge Replacement Project CX(s) Applied: B1.3 Date: 03/15/2010 Location(s): Snohomish County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to replace an existing dilapidated bridge across Little Pilchuck Creek, install three culverts in drainage ditches near the bridge, and repair 2,000 feet of existing on and off right-of-way (ROW) access roads along mile 16 of the Monroe-Custer Number 1 and Number 2 transmission Lines. Project work includes: excavation for bridge removal and installation, grading and shaping of roads, placing

295

Template Discontinuation Access  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FOR SUBJECT FOR SUBJECT FROM: Personnel Security Program Manager SUBJECT: Discontinuation of Access Eligibility Determination Reference is made to your Questionnaire for National Security Positions signed on [insert date], which was forwarded to this office in connection with a Department of Energy security clearance request. A review of that form disclosed recent use of illegal drugs. [Insert a brief description of the circumstances such as: Specifically, you listed marijuana use 1 time in 5/02; 1 time in 2/03; and 1 time in 3/07.] This office has discontinued the personnel security processing of your security clearance due to your illegal drug usage within twelve months of the signing of your security clearance application.

296

NSLS User Access | Training  

NLE Websites -- All DOE Office Websites (Extended Search)

Training Training Training for New Users and Users with Expired Training and/or Badges: All new users and users with expired badges must complete or update the training modules shown below prior to access to the experimental floor. The training can be completed online prior to arrival at the NSLS and is strongly recommended to save considerable time during check-in at the Guest, User, Visitor (GUV) Center in Building 400. Please note each training module is followed by an exam which asks for your name and guest number. If you do not already have a guest number, leave this entry blank. All new users and users with expired badges MUST arrive on a weekday (no weekends or holidays) and check in at the GUV Center so that your training can be verified and to receive a photo ID badge (new or updated). The GUV

297

REMOTE ACCESS SERVICES | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

REMOTE ACCESS SERVICES REMOTE ACCESS SERVICES REMOTE ACCESS SERVICES Access the information you need... Anywhere. Anytime. Different service providers within the Department offer remote access services based on your specific work requirements. If you need assistance, please contact your individual service provider. Energy IT Services (EITS) Remote Access Services Outlook Web Access RSA Token Login RSA Token Instructions HSPD-12 Login HSPD-12 Badge Instructions Virtual Private Network Instructions Citrix Workplace Instructions Energy Information Administration (EIA) Remote Access Services Outlook Web Access EIA VPN Office of Intelligence and Counterintelligence (IN) Remote Access Services Outlook Web Access Office of Science (SC) Remote Access Services Citrix Workplace Help for EITS Customers

298

Furman University OPEN ACCESS PLUS MEDICAL  

E-Print Network (OSTI)

Furman University OPEN ACCESS PLUS MEDICAL BENEFITS ­ Core Plan OPEN ACCESS PLUS MEDICAL BENEFITS ............................................................................................................................................11 Open Access Plus Medical Benefits

299

INFOGRAPHIC: The Road to Fuel Efficiency | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Road to Fuel Efficiency The Road to Fuel Efficiency INFOGRAPHIC: The Road to Fuel Efficiency November 27, 2012 - 11:01am Addthis This infographic takes a look at fuel economy standards and how recent improvements in these standards will benefit consumers and the U.S. economy. | Infographic by Sarah Gerrity. This infographic takes a look at fuel economy standards and how recent improvements in these standards will benefit consumers and the U.S. economy. | Infographic by Sarah Gerrity. Sarah Gerrity Sarah Gerrity Multimedia Editor, Office of Public Affairs The Obama Administration's new national fuel economy standards for passenger vehicles will improve vehicle efficiency and save Americans money at the pump, all while reducing our dependence on foreign oil and growing

300

Electricity for road transport, flexible power systems and wind power  

Open Energy Info (EERE)

road transport, flexible power systems and wind power road transport, flexible power systems and wind power (Smart Grid Project) Jump to: navigation, search Project Name Electricity for road transport, flexible power systems and wind power Country Denmark Coordinates 56.26392°, 9.501785° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":56.26392,"lon":9.501785,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "right-of-way access roads" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

On the Road with ARPA-E | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

On the Road with ARPA-E On the Road with ARPA-E On the Road with ARPA-E September 23, 2010 - 12:29pm Addthis ARPA-E Director Dr. Arun Majumdar and MSU Project Lead Dr. Norbert Mueller test the wave disk engine. ARPA-E Director Dr. Arun Majumdar and MSU Project Lead Dr. Norbert Mueller test the wave disk engine. Dr. Arun Majumdar Dr. Arun Majumdar Former Director, Advanced Research Projects Agency - Energy Auto enthusiasts should be forewarned that this post may make you jealous. I say that because earlier this month I traveled to Michigan to visit two projects ARPA-E is currently funding - one at Michigan State University (MSU), the second at General Motors (GM), and got an up close look at several innovative transportation-related energy advancements. While at MSU, I had the op portunity to tour the facility where the wave

302

Microsoft Word - FINAL Contact Record 2012-01 Roads Maintenance  

Office of Legacy Management (LM)

RFLMA Contact Record 2012-01 page 1 of 6 RFLMA Contact Record 2012-01 page 1 of 6 ROCKY FLATS SITE REGULATORY CONTACT RECORD Purpose: Soil Disturbance Review Plan-Roads maintenance, including grading the road to the former A-3 Pond to convert the road to two-track vehicle use. Contact Record Approval Date: May 31, 2012 Site Contact(s)/Affiliation(s): Scott Surovchak, U.S. Department of Energy (DOE); Gwen Hooton, DOE; Rick DiSalvo, S.M. Stoller Corporation (Stoller); Kurt Franzen, Stoller; Linda Kaiser, Stoller Regulatory Contact(s)/Affiliation(s): Carl Spreng, Colorado Department of Public Health and Environment (CDPHE); Vera Moritz, U.S. Environmental Protection Agency (EPA) Date of Consultation Meeting: May 24, 2012 Consultation Meeting Participants: Carl Spreng, CDPHE; Scott Surovchak, DOE;

303

Bruceville Road Solar Power Facility | Open Energy Information  

Open Energy Info (EERE)

Bruceville Road Solar Power Facility Bruceville Road Solar Power Facility Jump to: navigation, search Name Bruceville Road Solar Power Facility Facility Bruceville Solar Power Facility Sector Solar Facility Type Photovoltaics Facility Status In Service Developer Recurrent Energy Energy Purchaser Sacramento Municipal Utility District Location Elk Grove, California Coordinates 38.347479°, -121.412498° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.347479,"lon":-121.412498,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

304

Laboratory Access | Sample Preparation Laboratories  

NLE Websites -- All DOE Office Websites (Extended Search)

Access Access Planning Ahead Planning Ahead Please complete the Beam Time Request (BTR) and Support Request forms thourgh the User Portal. Thorough chemical and sample information must be included in your BTR. Support Request forms include a list of collaborators that require laboratory access and your group's laboratory equipment requests. Researcher safety is taken seriously at SLAC. Please remember that radioactive materials, nanomaterials, and biohazardous materials have additional safety requirements. Refer to the SSRL or LCLS Safety Offices for further guidance. Upon Arrival Upon Arrival Once you arrive you must complete training and access forms before accessing the Sample Preparation Laboratories (SPL). All Sample Prep Lab doors are locked with access key codes. Once your SPL

305

Furman University OPEN ACCESS PLUS MEDICAL  

E-Print Network (OSTI)

8:54 AM Furman University OPEN ACCESS PLUS MEDICAL BENEFITS ­ Basic Plan OPEN ACCESS PLUS MEDICAL ...................................................................................................................................................10 Open Access Plus Medical Benefits Basic Plan ...............................................................................................................................................................12 Open Access Plus Medical Benefits Core Plan

306

Access Control Policy Tool (ACPT)  

Science Conference Proceedings (OSTI)

... In regard to cyber security, privacy, and information sharing, access control is one of the crucial elements in protecting the nation's critical IT ...

2013-01-15T23:59:59.000Z

307

Foreign National Access Request Form  

NLE Websites -- All DOE Office Websites (Extended Search)

will be allowed access to the ANL facility prior to approval by the Security and Counterintelligence Division. The visitor must have a valid passport and visa (or supplemental...

308

Science Open Access Journals - About  

Office of Scientific and Technical Information (OSTI)

SOAJ allows the user to search multiple open access publications with a single query. The query is sent simultaneously to each individual database searched by SOAJ,...

309

Optical access port  

DOE Patents (OSTI)

A 0.025 m diameter optical access port system is provided for a high-pressure (20.4 bars) and high-temperature (538{degrees}C) fixed-bed coal gasification process stream. A pair of proximal channels lead into the pipe containing the process stream with the proximal channels disposed on opposite sides of the pipe and coaxial. A pair of ball valves are attached to respective ends of proximal channels for fluidly closing the respective channels in a closed position and for providing a fluid and optical aperture in an open position. A pair of distal channels are connected to respective ball valves. These distal channels are also coaxial with each other and with the proximal channels. Each distal channel includes an optical window disposed therein and associated sealing gaskets. A purge gas is introduced into each distal channel adjacent a respective optical window. The purge gas is heated by a heater before entry into the distal channels. Preferably the optical windows are made of fused silica and the seals are Grafoil gaskets which are pressed against the optical window. 3 figs.

Lutz, S.A.; Anderson, R.J.

1988-09-14T23:59:59.000Z

310

Internal Controls Over Sensitive Compartmented Information Access...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Controls Over Sensitive Compartmented Information Access for Selected Field Intelligence Elements, IG-0796 Internal Controls Over Sensitive Compartmented Information Access...

311

Oregon E.V. Road Map - Electric Drive Vehicle (PHEVs) Testing...  

NLE Websites -- All DOE Office Websites (Extended Search)

Oregon E.V. Road Map - Electric Drive Vehicle (PHEVs) Testing Activities and Results Jim Francfort E.V. Road Map - Preparing Oregon for the Introduction of Electric Vehicles...

312

Conceptual and Scaling Evaluation of Vehicle Traffic Thermal Effects on Snow/Ice-Covered Roads  

Science Conference Proceedings (OSTI)

The potential thermal effects of traffic on road surface thermal energy balance under frost/snow cover conditions have been largely ignored in meteorological evaluations of road ice deposit conditions. Preliminary exploration of these effects, ...

Joseph M. Prusa; Moti Segal; Bradley R. Temeyer; William A. Gallus Jr.; Eugene S. Takle

2002-12-01T23:59:59.000Z

313

The Private Provision of Frontier Infrastructure: Toll Roads in California, 1850-1902  

E-Print Network (OSTI)

action. The impetus for taking stock was not dividends butimpetus for taking toll road stock. Voluntary association

Klein, Daniel B.; Yin, Chi

1994-01-01T23:59:59.000Z

314

Putting Electricity Where The Rubber Meets the Road [NEWS  

Science Conference Proceedings (OSTI)

In-wheel motors can improve fuel economy and safety for hybrid electric vehicles. A motor housed inside a wheel hub can shunt up to 96 percent of the torque it generates directly to the patch of tire that touches the road. With a conventional drivetrain, ...

W. D. Jones

2007-07-01T23:59:59.000Z

315

Remote Sensing Messungen zur on-road Bestimmung der  

E-Print Network (OSTI)

LUBETRAX Remote Sensing Messungen zur on-road Bestimmung der Abgase von schweren Motorfahrzeugen, Chur, Zürich, Brugg Dr. Peter Maly (Projektleitung) Dr. Stefan Scherer Dr. G.A. Bishop (Remote Sensing;Inhaltsverzeichnis Zusammenfassung 1 1. Einleitung und Zielsetzung 3 1.1 Remote Sensing Messungen (FEAT) 4 1

Denver, University of

316

Harmful Exhaust Emissions Monitoring of Road Vehicle Engine  

Science Conference Proceedings (OSTI)

Road vehicle improve the quality of people's life, however harmful vehicle exhaust emissions, such as carbon monoxide (CO), nitric oxide (NO), nitrogen dioxide (NO2), hydrocarbon (HC), and sulphur dioxide (SO2), have become more and more unacceptable ... Keywords: optic absorption spectroscopy based gas sensor, harmful exhaust emission monitoring, engine vibration

Chuliang Wei; Zhemin Zhuang; H. Ewald; A. I. Al-Shamma'a

2012-01-01T23:59:59.000Z

317

A GIS based approach to predicting road surface temperatures  

Science Conference Proceedings (OSTI)

Treatment of transport networks of the winter period is a key responsibility of maintenance teams whether in the private or public sector. With tightening budgets and increasing statutory requirements, maintenance teams are looking to improve the treatment ... Keywords: ASP.NET, ArcGIS server, GIS, ice prediction, roads

Richard Fry; Lionel Slade; George Taylor; Ian Davy

2007-11-01T23:59:59.000Z

318

Fuel-Based On-Road Motor Vehicle Emissions Inventory  

E-Print Network (OSTI)

Fuel-Based On-Road Motor Vehicle Emissions Inventory for the Denver Metropolitan Area Sajal S sales from tax department -quite precise Inventory -uncertainty can be estimated Travel Based Model FuelGasohol (LTK, PAS) Tons/day3748369Gasoline (LTK, PAS) g per kg of fuel7859Gasohol (LTK, PAS) g per kg

Denver, University of

319

ROAD AND STREAM NETWORK CONNECTIVITY NORTHEASTERN PUERTO RICO  

E-Print Network (OSTI)

variables which are influenced by R/S connectivity. Physical R/S connectivity at 24 river road crossing (RRC alteration in the immediate area of the RRC. To gain incite into underlying dynamics scour scores were type, and Stream size, resulting in a model with a R2 value of 0.64. A method of evaluating RRC acting

320

Road Transportable Analytical Laboratory (RTAL) system: Volume I. Final report  

Science Conference Proceedings (OSTI)

This report describes a portable laboratory system for the analysis of soils, ground water, and surface waters for the detection and quantification of hazardous materials, organics, and radioactive contaminants. The goal of the Road Transportable Analytical Laboratory (RTAL) is a sample throughput of 20 samples per day, providing a full range of analysis on each sample within 16 hours of preparation with high accuracy.

Finger, S.M.; De Avila, J.C.; Keith, V.F.

1996-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "right-of-way access roads" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Categorical Exclusion Determinations: B4.10 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 Categorical Exclusion Determinations: B4.10 Existing Regulations B4.10: Removal of electric transmission facilities Deactivation, dismantling, and removal of electric transmission facilities (including, but not limited to, electric powerlines, substations, and switching stations) and abandonment and restoration of rights-of-way (including, but not limited to, associated access roads). Previous Regulations Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion. DOCUMENTS AVAILABLE FOR DOWNLOAD August 13, 2013 CX-010727: Categorical Exclusion Determination Dayton Tap Line Retirement

322

Destin Dome 56 Unit development and production plan and right-of-way pipeline application: Draft environmental impact statement. Volume 1: Sections 1--10  

SciTech Connect

The MMS prepared this environmental impact statement (EIS) on Chevron`s plan to drill 20 new wells within the Destin Dome (DD) 56 Unit, to produce up to 450 trillion cubic feet of natural gas per day, and to transport the gas through pipelines to processing plants in Alabama. Volume 1---Section 1 states the reasons for the proposed development of the DD 56 Unit and describes the plan and pipeline in detail. Section 2 describes the proposal, the alternatives, and the mitigation measures. Section 3 describes the physical, biological, and social resources within the DD 56 Unit and in areas from Pascadoula, Mississippi, to Cape San Blas, Florida, that might be affected if Chevron is allowed to go ahead with the plan. This descriptive background information gives the status of these reasons as they are now. Section 4 analyzes the environmental effects that could be anticipated from Chevron`s plan, and a separate analysis of possible and expected effects is done for the resources described in Section 3. Section 5 discusses how the Draft EIS was developed and distributed. Section 6 lists the references cited in the main text. Section 7 lists the people who wrote and worked on the EIS. Section 8 is a glossary of terms used. Section 9 (Appendices) contains technical information, including descriptions of the geology and physical oceanography of the DD 56 Unit.

NONE

1999-08-20T23:59:59.000Z

323

Power Line-Induced AC Potential on Natural Gas Pipelines for Complex Rights-of-Way Configurations, Volume 4: Field Verification of H orizontal Wire Mitigation Method  

Science Conference Proceedings (OSTI)

Volume 4 of this four-volume report contains details on a new method of mitigating induced voltage on pipelines by coupling them with a conductor buried in parallel. A field demonstration of this mitigation method that took place in California's Mohave Desert is also described.

1984-04-01T23:59:59.000Z

324

Soil Compaction: A Comprehensive Literature Review: State-of-the-Art Review and Bibliography With Interpretations for Transmission Rights-of-Way  

Science Conference Proceedings (OSTI)

The second in a series of related reports, this study identifies causes and effects of soil compaction and remedial techniques to alleviate those effects.

1999-09-16T23:59:59.000Z

325

Nano-Interchange vs. the All-Directional Four-Level: A Comparison of Geometrics, Construction Costs, and Right of Way Requirements.  

E-Print Network (OSTI)

??This thesis introduces the nano-interchange, an innovative concept in freeway-to-freeway interchange design, originating with Dr. Joseph Hummer, P.E., of North Carolina State University. Created with… (more)

Harris, Meredith Louise

2007-01-01T23:59:59.000Z

326

The safe system approach: a road safety strategy based on human factors principles  

Science Conference Proceedings (OSTI)

In most safety critical domains, safety has been improved through the application of contemporary human error models and management methods. But the common strategic approach to improve road safety has so far mainly been built on the view that individual ... Keywords: human factors, road safety, road users, safe System approach, safety, system safety, vision zero

Peter Larsson, Claes Tingvall

2013-07-01T23:59:59.000Z

327

CX-008790: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

90: Categorical Exclusion Determination 90: Categorical Exclusion Determination CX-008790: Categorical Exclusion Determination Routine Maintenance of Hesperus-Montrose 345 Kilovolt Transmission Line Access Roads San Miguel, Ouray, Montrose, Montezuma, La Plata, and Dolores Counties, Colorado CX(s) Applied: B1.3 Date: 06/05/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) proposes to perform routine maintenance of existing access roads and right-of-way (ROW) along the Hesperus-Montrose (HSP-MTR) 345-kilovolt (kV) transmission line to safely access structures 64, 67, 81, 82, 93, 97, 99, 100, 122, 125, and 143 (approximately 20 miles). CX-008790.pdf More Documents & Publications CX-009411: Categorical Exclusion Determination

328

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

NLE Websites -- All DOE Office Websites (Extended Search)

Routine Maintenance of Hesperus-Montrose 345-kV Transmission Line Access Roads San Miguel, Ouray, Montrose, Montezuma, La Plata, and Dolores Counties, Colorado A. Brief Description of Proposal: Western Area Power Administration (Western) proposes to perform routine maintenance of existing access roads and right-of-way (ROW) along the Hesperus-Montrose (HSP-MTR) 345-kilovolt (kV) transmission line to safely access structures 64, 67, 81, 82, 93, 97, 99, 100, 122, 125, and 143 (approximately 20 miles). The project is located on private, U.S. Bureau of Land Management (BLM), and U.S. Forest Service (USFS) lands in San Miguel, Ouray, Montrose, Montezuma, La Plata, and Dolores Counties, Colorado. Routine maintenance actions proposed for HSP-MTR 345-kV transmission line include the

329

Notices Accessible Format: Individuals with  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

472 Federal Register 472 Federal Register / Vol. 77, No. 83 / Monday, April 30, 2012 / Notices Accessible Format: Individuals with disabilities can obtain this document in an accessible format (e.g., braille, large print, audiotape, or computer diskette) on request to the program contact person listed under FOR FURTHER INFORMATION CONTACT. Electronic Access to This Document: The official version of this document is the document published in the Federal Register. Free Internet access to the official edition of the Federal Register and the Code of Federal Regulations is available via the Federal Digital System at: www.gpo.gov/fdsys. At this site you can view this document, as well as all other documents of this Department published in the Federal Register, in text or Adobe Portable Document

330

Network Access to Multimedia Information  

Science Conference Proceedings (OSTI)

This report summarises the requirements of research and academic network users for network access to multimedia information. It does this by investigating some of the projects planned or currently underway in the community. Existing information systems ...

C. Adie

1994-05-01T23:59:59.000Z

331

Microsoft Word - CX_Fairview-Rogue_AR_PPA_984_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Richard Heredia Project Manager - TELF-TPP-3 Proposed Action: Maintenance of and improvements to the access roads from structure 53/3 through 66/3 of the Fairview-Rogue No. 1 transmission line corridor PP&A Project No.: 984 Budget Information: 220499 Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance activities...for structures, rights of way, infrastructures such as roads, equipment... routine maintenance activities, corrective....are required to maintain...infrastructures...in a condition suitable for a facility to be used for its designed purpose. Location: Multiple locations in Curry County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to perform road maintenance activities

332

Microsoft Word - CX-RockyReach-MapleValley_accessroad_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Darin Bowman Project Manager - TELF-TPP-3 Proposed Action: Access road repair including reconstructing, grading, and shaping of roads, placing and compacting of rock surfacing, installation of gates, installation and maintenance of erosion control and water drainage features, and restoration of disturbed areas. Budget Information: Work Order # 00263533 PP&A Project No.: 1977 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities... for...rights-of-way, infrastructures (e.g. roads)...routine maintenance activities, corrective...are required to maintain and preserve infrastructures...in a condition

333

Microsoft Word - CX_Lancaster-Noxon_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

16, 2010 16, 2010 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Jason Moon Project Manager - TELF-TPP-3 Proposed Action: Lancaster-Noxon No. 1 Mile 46-50 Access Road Improvement and Bridge Replacement Project Budget Information: Work Order # 202389 PP&A Project No.: 586 Proposed by: Bonneville Power Administration (BPA) Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance activities for structures, rights-of-way (ROW), and infrastructures, such as roads, that are required to maintain infrastructures in a condition suitable for a facility to be used for its designed purpose. Location: BPA is proposing to conduct road improvements along the Lancaster-Noxon No. 1

334

CX-006255: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

255: Categorical Exclusion Determination 255: Categorical Exclusion Determination CX-006255: Categorical Exclusion Determination Indian Cabin Road Repair Date: 06/22/2011 Location(s): Skamania County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to repair the damage caused by a slope failure on Indian Cabin Road. The damage to the road prevents access to approximately two miles of significant Western Electricity Coordinating Council (WECC) right-of-way (ROW) corridor containing BPA?s 500-kilovolt Wautoma-Ostrander and 45-kilovolt McNary-Ross transmission lines. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-006255.pdf More Documents & Publications CX-008889: Categorical Exclusion Determination CX-006817: Categorical Exclusion Determination CX-005546

335

CX-006253: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

53: Categorical Exclusion Determination 53: Categorical Exclusion Determination CX-006253: Categorical Exclusion Determination North Bonneville-Ross #1 230-Kilovolt, North Bonneville-Troutdale #2 230-Kilovolt Transmission Line Maintenance CX(s) Applied: B4.13 Date: 06/14/2011 Location(s): Clark County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to conduct transmission line maintenance along a portion of the North Bonneville-Ross #1 and North Bonneville-Troutdale #2 230-kilovolt transmission lines. The maintenance activities will take place within the existing transmission line and access road right-of-way easements and includes upgrading existing roads, developing new roads, installing two new wood pole structures and two new steel tower structures.

336

Microsoft Word - CX-Fairview-Rogue-AR_PPA_1990_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Richard Heredia Project Manager - TELF-TPP-3 Proposed Action: Fairview-Rogue Access Road Maintenance Project PP&A Project No.: 1990 Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads, equipment... routine maintenance activities, corrective....are required to maintain...infrastructures...in a condition suitable for a facility to be used for its designated purpose. Location: The project is located in Coos County, Oregon, and includes the Townships, Ranges, and Sections listed below: Township Range Sections 27S 12W 26 28S 12W 8, 17, 18 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to perform road maintenance activities

337

XML access control using static analysis  

Science Conference Proceedings (OSTI)

Access control policies for XML typically use regular path expressions such as XPath for specifying the objects for access-control policies. However such access-control policies are burdens to the query engines for XML documents. To relieve this burden, ... Keywords: Access control, XML, XPath, XQuery, automaton, query optimization, schema, static analysis, value-based access control, view schema

Makoto Murata; Akihiko Tozawa; Michiharu Kudo; Satoshi Hada

2006-08-01T23:59:59.000Z

338

Godfrey Road, Florida: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Godfrey Road, Florida: Energy Resources Godfrey Road, Florida: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 26.293686°, -80.223003° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":26.293686,"lon":-80.223003,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

339

U.S. Virgin Islands Energy Road Map: Analysis  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Energy Road Map: Analysis Eric Lantz, Dan Olis, and Adam Warren Technical Report NREL/TP-7A20-52360 September 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 U.S. Virgin Islands Energy Road Map: Analysis Eric Lantz, Dan Olis, and Adam Warren Prepared under Task No. IDVI.0020 Technical Report NREL/TP-7A20-52360 September 2011 NOTICE This report was prepared as an account of work sponsored by an agency of the United States government.

340

Airport Road, Wyoming: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Road, Wyoming: Energy Resources Road, Wyoming: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 43.9932901°, -107.9492606° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.9932901,"lon":-107.9492606,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "right-of-way access roads" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

West Valley Demonstration Project 10282 Rock Springs Road  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

West Valley Demonstration Project West Valley Demonstration Project 10282 Rock Springs Road West Valley, NY 141 71 -9799 Mr. Daniel W. Coyne President & General Manager CH2M HILL B&W West Valley, LLC West Valley Demonstration Project 10282 Rock Springs Road West Valley, NY 141 71 -9799 ATTENTION: J. D. Rendall, Regulatory Strategy, AC-EA SUBJECT: Environmental Checklist WVDP-20 12-0 1, " WVDP Reservoir Interconnecting Canal Maintenance Activities" REFERENCE: Letter WD:2012:0409 (357953), D. W. Coyne to R. W. Reffner, "CONTRACT NO. DE-EM000 1529, Section 5-3, Item 105, NEPA Documentation (Transmittal of Environmental Checklist WVDP-20 12-0 1, WVDP Reservoir Interconnecting Canal Maintenance Activities), Revision 1 ," dated July 24, 20 12 Dear Mr. Coyne:

342

Moose Wilson Road, Wyoming: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Road, Wyoming: Energy Resources Road, Wyoming: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 43.5252053°, -110.844655° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.5252053,"lon":-110.844655,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

343

Science Education on the Road: 2013 Princeton University Community and  

NLE Websites -- All DOE Office Websites (Extended Search)

Science Education on the Road: 2013 Princeton University Community and Science Education on the Road: 2013 Princeton University Community and Staff Day October 12, 2013 Gallery: It was a beautiful autumn day in Princeton, NJ. As tailgaters got ready for the football game (Princeton vs. Lafayette) in Lot 21, others took the short walk into Jadwin Gym to take part in the University's Annual Community & Staff Day. PPPL was represented by the Science Education Department and in usual Science Ed. fashion, we did not disappoint! The table was busy all day with kids and adults equally fascinated by what they learned... Plasma! From the hair-raising Van de Graaff generator to the innovative Plasma Speaker to the surprising vacuum pump marshmallow experiment, folks were wowed by what they saw. Spreading the word about Plasma while having a great time, check!

344

Alaskan Ice Road Water Supplies Augmented by Snow Barriers  

NLE Websites -- All DOE Office Websites (Extended Search)

6, 2013 6, 2013 Alaskan Ice Road Water Supplies Augmented by Snow Barriers Washington, D.C. - In a project supported and managed by the Office of Fossil Energy's National Energy Technology Laboratory (NETL), researchers at the University of Alaska Fairbanks have demonstrated that the use of artificial barriers-snow fences-can significantly increase the amount of fresh water supplies in Arctic lakes at a fraction of the cost of bringing in water from nearby lakes. The results promise to enhance environmentally sound development of Alaska's natural resources, lowering the costs of building ice roads used for exploring for oil and natural gas in Alaska. They could also be used to help augment fresh water supplies at remote villages. Researcher Joel Bailey measures the density of the snow in this snow pit to determine the amount of snow in the drift and the water equivalent of the snow drift.

345

Microsoft Word - WIPPSouthAccess.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

WIPP em cess Road, WIPP's No utheastern on fixed-pric the WIPP m mpletion is South Acces ng Carlsbad n project wa RA). Under ss the coun used to suc ter and the A funds, WI 1...

346

Trends in On-Road Vehicle Emissions of Ammonia  

NLE Websites -- All DOE Office Websites (Extended Search)

Trends in On-Road Vehicle Emissions of Ammonia Trends in On-Road Vehicle Emissions of Ammonia Title Trends in On-Road Vehicle Emissions of Ammonia Publication Type Journal Article Year of Publication 2008 Authors Kean, Andrew J., David Littlejohn, George Ban-Weiss, Robert A. Harley, Thomas W. Kirchstetter, and Melissa M. Lunden Journal Atmospheric Environment Abstract Motor vehicle emissions of ammonia have been measured at a California highway tunnel in the San Francisco Bay area. Between 1999 and 2006, light-duty vehicle ammonia emissions decreased by 38 ± 6%, from 640 ± 40 to 400 ± 20 mg kg-1. High time resolution measurements of ammonia made in summer 2001 at the same location indicate a minimum in ammonia emissions correlated with slower-speed driving conditions. Variations in ammonia emission rates track changes in carbon monoxide more closely than changes in nitrogen oxides, especially during later evening hours when traffic speeds are highest. Analysis of remote sensing data of Burgard et al. (Environ Sci. Technol. 2006, 40, 7018-7022) indicates relationships between ammonia and vehicle model year, nitrogen oxides, and carbon monoxide. Ammonia emission rates from diesel trucks were difficult to measure in the tunnel setting due to the large contribution to ammonia concentrations in a mixed-traffic bore that were assigned to light-duty vehicle emissions. Nevertheless, it is clear that heavy-duty diesel trucks are a minor source of ammonia emissions compared to light-duty gasoline vehicles.

347

Draft Supplement to the Environmental Statement Fiscal Year 1976 Proposed Program : Facility Location Evaluation for Cheney-Four Lakes Area Service Study Area 76-7.  

SciTech Connect

Proposed is construction of approximately 26 miles of 230-kV transmission line from the Four Mounds Area west of Spokane to either Cheney or Four Lakes Substation. Proposed also is construction of a new substation in the Four Mounds area. Depending upon final route location chosen, between 20 and 27 miles of new right-of-way would be required between the proposed Greenwood Substation and either Cheney or Four Lakes Substation. Between 25 and 41 miles of access road would also be required. Depending upon the final route selected, the amount of impact upon forest land would range from zero to 97 acres permanently removed. The amount of land temporarily disrupted for rangeland and cropland would be 8 to 13 acres and 30 to 40 acres, respectively. In addition, between approximately 4 and 8 acres of rangeland would be removed due to construction of the proposed new substation. Other impacts would include the removal of wildlife habitat associated with the above mentioned right-of-way requirements. Disturbance to wildlife during construction would occur. Some erosion and sedimentation would occur. Visual impacts would result from clearing rights-of-way through heavily forested areas. Noise and other disturbances to residents will occur, primarily during construction.

United States. Bonneville Power Administration.

1975-04-15T23:59:59.000Z

348

Facility Location Evaluation for Satsop Integrating Transmission : Final Supplement to the Environmental Statement, Fiscal Year 1976 Proposed Program.  

SciTech Connect

Proposed is the construction of a substation near Satsop and two 500-kV transmission lines from the proposed Satsop Substation approximately 24 miles west of Olympia, one running from Satsop to Paul Substation and one running from Satsop to Olympia Substation. Approximately 74 miles of 500-kV transmission line between the proposed Satsop Substation and Olympia and Paul Substations over existing, parallel, and new right-of-way would be required. Between 15 and 31 miles of new access road would also be required. Land use affected would include clearing from 560 to 1180 acres of timber. Approximately one acre of agricultural land would be removed from production and 37 acres temporarily disrupted. In addition approximately 30 acres of land would be required for the substation. Other impacts would include the removal of wildlife habitat associated with the above mentioned right-of-way requirements. Disturbance to wildlife during construction would occur. Some erosion and sedimentation would occur. Visual impacts would result from clearing rights-of-way through heavily forested areas. Noise and other disturbances to residents will occur, primarily during construction.

United States. Bonneville Power Administration.

1976-06-08T23:59:59.000Z

349

HM-ACCESS Project | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HM-ACCESS Project HM-ACCESS Project Framework for the Use of Electronic Shipping Papers for the Transport of Hazardous Materials HM-ACCESS Project (Framework for the Use of...

350

2e Carbon Access | Open Energy Information  

Open Energy Info (EERE)

Access Jump to: navigation, search Name 2e Carbon Access Place New York, New York Zip 10280 Sector Carbon Product 2E Carbon Access is an enterprise focused solely on bringing...

351

Insights on the Road to Performance Excellence January ...  

Science Conference Proceedings (OSTI)

... In her article, Leslie Gaines-Ross makes the point that anyone with a personal computer and access to blogs, Facebook, Twitter, or YouTube can ...

2012-12-31T23:59:59.000Z

352

Cultural Resource Investigations for a Multipurpose Haul Road on the Idaho National Laboratory  

Science Conference Proceedings (OSTI)

The U. S. Department of Energy, Idaho Operations Office is considering options for construction of a multipurpose haul road to transport materials and wastes between the Materials and Fuels Complex (MFC) and other Idaho National Laboratory (INL) Site facilities. The proposed road will be closed to the public and designed for limited year-round use. Two primary options are under consideration: a new route south of the existing T-25 power line road and an upgrade to road T-24. In the Spring of 2010, archaeological field surveys and initial coordination and field reconnaissance with representatives from the Shoshone-Bannock Tribes were completed to identify any resources that may be adversely affected by the proposed road construction and to develop recommendations to protect any listed or eligible for listing on the National Register of Historic Places. The investigations showed that 24 archaeological resources and one historic marker are located in the area of potential effects for road construction and operation south of the T-25 powerline road and 27archaeological resources are located in the area of potential effects for road construction and operation along road T-24. Generalized tribal concerns regarding protection of natural resources were also documented in both road corridors. This report outlines recommendations for additional investigations and protective measures that can be implemented to minimize adverse impacts to the identified resources.

Brenda R. Pace; Cameron Brizzee; Hollie Gilbert; Clayton Marler; Julie Braun Williams

2010-08-01T23:59:59.000Z

353

NBP RFI: Data Access | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Access NBP RFI: Data Access Neustar, Inc. ("Neustar") hereby submits comments in response to the captioned Request for Information ("RFI") of the Department of Energy ("DOE"). The...

354

Remote Access of Computer Controlled Experiments.  

E-Print Network (OSTI)

??In this paper, we present a way for students to access and operate laboratory equipment, controlled by a laboratory computer via a remote access program.… (more)

Nilsson, Kristian; Zackrisson, Johan

2008-01-01T23:59:59.000Z

355

International Electricity Trade - Open Access | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

International Electricity Trade - Open Access International Electricity Trade - Open Access DOE has consistently expressed its policy that international electricity trade should be...

356

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

NLE Websites -- All DOE Office Websites (Extended Search)

roads and right-of-way (ROW) along the Curecanti-Lost Canyon (CCI-LCN) 230-kilovolt (kV) transmission line at structures 02 to 13, 32, 81, 86, 96 to 97, 122 to 142, 155,...

357

Categorical Exclusion Determinations: B1.13 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 Categorical Exclusion Determinations: B1.13 Existing Regulations B1.13: Pathways, short access roads, and rail lines Construction, acquisition, and relocation, consistent with applicable right-of-way conditions and approved land use or transportation improvement plans, of pedestrian walkways and trails, bicycle paths, small outdoor fitness areas, and short access roads and rail lines (such as branch and spur lines). Previous Regulations Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion. DOCUMENTS AVAILABLE FOR DOWNLOAD July 25, 2013 CX-010604: Categorical Exclusion Determination

358

Environmental Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

ASSESSMENT (EA) ASSESSMENT (EA) FOR THE RECONSTRUCTION OF THE SOUTH ACCESS ROAD (CR 802) IN SUPPORT OF THE DEPARTMENT OF ENERGY, WASTE ISOLATION PILOT PLANT (WIPP) IN EDDY COUNTY, NEW MEXICO NEPA #: DOI-BLM-NM-P020-2010-0011-EA PREPARED IN COOPERATION WITH: DEPARTMENT OF ENERGY CARLSBAD FIELD OFFICE P. O. BOX 2078 CARLSBAD, NM 88221-2078 PREPARED BY: OWEN W. LOFTON SUPERVISORY MULTI RESOURCES SPECIALIST BUREAU OF LAND MANAGEMENT CARLSBAD FIELD OFFICE 620 EAST GREENE CARLSBAD, NM 88220 ENVIRONMENTAL ASSESSMENT BLM Office: Carlsbad Field Office DOI-BLM-NM-P020-2010-0011-EA Serial #: NM-123703 Department of Energy (DOE), Carlsbad Field Office (CBFO) Waste Isolation Pilot Plant (WIPP) South Access Road (SAR) 1.0 Purpose and Need for Action 1.1 The DOE CBFO, is requesting a right-of-way (ROW) that consists of re-

359

CX-000555: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

555: Categorical Exclusion Determination 555: Categorical Exclusion Determination CX-000555: Categorical Exclusion Determination Boysen-Pilot Butte 115-kilovolt Transmission Line Vegetation Management and Access Road Maintenance CX(s) Applied: B1.3 Date: 12/02/2009 Location(s): Fremont County, Wyoming Office(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration proposes to conduct vegetation management activities within the 125-foot transmission line right-of-way and perform maintenance on existing access roads along the Boysen-Pilot Butte 115-kilovolt transmission line in Fremont County, Wyoming. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-000555.pdf More Documents & Publications CX-004456: Categorical Exclusion Determination CX-009801: Categorical Exclusion Determination

360

EIS-0285-SA-128: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8: Supplement Analysis 8: Supplement Analysis EIS-0285-SA-128: Supplement Analysis Transmission System Vegetation Management Program BPA proposes to remove unwanted vegetation along the right-ofway, access roads and around tower structures along the subject transmission line corridors. Approximately 5 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 0.5 mile of access road will be cleared using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Tower sites will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Vegetation management is required for unimpeded operation and

Note: This page contains sample records for the topic "right-of-way access roads" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Microsoft Word - CX-Monroe-Custer-AR-FY13_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 26, 2013 August 26, 2013 REPLY TO ATTN OF: KEPR-Covington SUBJECT: Environmental Clearance Memorandum Darin Bowman Civil Engineer - TELF-TPP-3 Proposed Action: Access road and landing improvements on Bonneville Power Administration's (BPA) Monroe-Custer No. 2 transmission line PP&A Project No.: 2748 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance/custodial services for buildings, structures, infrastructures, equipment Location: Skagit and Snohomish counties, Washington Proposed by: BPA Description of the Proposed Action: BPA proposes to conduct access road improvements along selected areas of the Monroe-Custer No. 2, 500-kilovolt transmission line right-of-way (ROW). Specifically, work will take place between structures 10/3 to 11/2 and structures 45/5

362

Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and structure replacement and structure replacement along the existing Casa Grande-Empire 11~-kV transmission line, Pinal County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to replace structures and upgrade to a double circuit 230-kV transmission line on its Casa Grande-Empire115-kV transmission line, from Thornton Road to its Empire Substation, within Western's existing right-of-way. This will include the rebuild of 13.2 miles of transmission line, replacing the H-frame structures with steel monopole structures with foundations, hardware and insulator replacement and adding a overhead ground-wire over the entire length of the project. Western will access the structure using crew trucks along the existing access roads. This work is necessary to maintain the safety and reliability of the bulk

363

EIS-0285-SA-128: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

85-SA-128: Supplement Analysis 85-SA-128: Supplement Analysis EIS-0285-SA-128: Supplement Analysis Transmission System Vegetation Management Program BPA proposes to remove unwanted vegetation along the right-ofway, access roads and around tower structures along the subject transmission line corridors. Approximately 5 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 0.5 mile of access road will be cleared using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Tower sites will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Vegetation management is required for unimpeded operation and

364

Opportunities for the Use of Renewable Energy in Road Transport | Open  

Open Energy Info (EERE)

Opportunities for the Use of Renewable Energy in Road Transport Opportunities for the Use of Renewable Energy in Road Transport Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Opportunities for the Use of Renewable Energy in Road Transport Agency/Company /Organization: Renewable Energy Technology Deployment Sector: Energy Focus Area: Renewable Energy, Transportation Topics: Implementation, Policies/deployment programs Resource Type: Publications, Guide/manual Website: www.iea-retd.org/files/RETRANS_PolicyMakersReport_final.pdf Opportunities for the Use of Renewable Energy in Road Transport Screenshot References: Opportunities for the Use of Renewable Energy in Road Transport[1] "This report discusses the current state of the art of the use of options for using renewable energies in road transport, and explores possible

365

DEPARTMENT OF ENERGY FINDING OF NO SIGNIFICANT IMPACT FOR THE MULTIPURPOSE HAUL ROAD  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FINDING OF NO SIGNIFICANT IMPACT FOR THE MULTIPURPOSE HAUL ROAD FINDING OF NO SIGNIFICANT IMPACT FOR THE MULTIPURPOSE HAUL ROAD WITHIN THE IDAHO NATIONAL LABORATORY SITE (EM-FMDP-I0-068) Agency: U. S. Department of Energy (DOE) Action: Finding of No Significant Impact (FONSI) Summary: The DOE prepared a Draft Environmental Assessment (EA) for the proposed "Environmental Assessment for the Multipurpose Haul Road Within the Idaho National Laboratory Site" (DOE/EA-I772). The proposed action consists of constructing a road for limited year-round use with the ability for trucks traveling in opposite directions to pass. The analysis of the proposed road evaluates clearing and grading a base, installing necessary culverts and drainage, and placing and compacting gravel for the roadway. The haul road would be used to:

366

Vehicle Technologies Office: Fact #502: January 21, 2008 Off-Road Diesel  

NLE Websites -- All DOE Office Websites (Extended Search)

2: January 21, 2: January 21, 2008 Off-Road Diesel Equipment Facing Tougher Emissions Regulation to someone by E-mail Share Vehicle Technologies Office: Fact #502: January 21, 2008 Off-Road Diesel Equipment Facing Tougher Emissions Regulation on Facebook Tweet about Vehicle Technologies Office: Fact #502: January 21, 2008 Off-Road Diesel Equipment Facing Tougher Emissions Regulation on Twitter Bookmark Vehicle Technologies Office: Fact #502: January 21, 2008 Off-Road Diesel Equipment Facing Tougher Emissions Regulation on Google Bookmark Vehicle Technologies Office: Fact #502: January 21, 2008 Off-Road Diesel Equipment Facing Tougher Emissions Regulation on Delicious Rank Vehicle Technologies Office: Fact #502: January 21, 2008 Off-Road Diesel Equipment Facing Tougher Emissions Regulation on Digg

367

Archaeological investigations on the Buckboard Mesa Road Project  

SciTech Connect

In 1986, the Desert Research Institute (DRI) conducted an archaeological reconnaissance of a new alignment for the Buckboard Mesa Road on the Nevada Test Site for the Department of Energy (DOE). During this reconnaissance, several archaeological sites of National Register quality were discovered and recorded including a large quarry, site 26Ny4892, and a smaller lithic scatter, site 26Ny4894. Analysis of the debitage at 26Ny4892 indicates that this area was used primarily as a quarry for relatively small cobbles of obsidian found in the alluvium. Lithic reduction techniques used here are designed for efficiently reducing small pieces of toolstone and are oriented towards producing flake blanks from small cores and bifacially reducing exhausted cores. Projectile point cross references indicate that the area has seen at least casual use for about 10,000 years and more sustained use for the last 3,000 years. Initial obsidian hydration measurements indicate sustained use of the quarry for about the last 3,000 years although the loci of activities appear to change over time. Based on this study, the DRI recommends that quarrying activities in the area of 26Ny4892 are sufficiently sampled and that additional investigations into that aspect of prehistoric activity in the area are not necessary. This does not apply to other aspects of prehistoric use. DRI recommends that preconstruction surveys continue to identify nonquarrying, prehistoric utilization of the area. With the increased traffic on the Buckboard Mesa Road, there is a greater potential for vandalism to sites of National Register-quality located near the road. The DRI recommends that during the orientation briefing the workers at the Test Site be educated about the importance of cultural resources and the need for their protection. 202 refs., 41 figs., 52 tabs.

Amick, D.S.; Henton, G.H.; Pippin, L.C.

1991-10-01T23:59:59.000Z

368

NBP_RFI_Data_Access.PDF | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NBPRFIDataAccess.PDF NBPRFIDataAccess.PDF NBPRFIDataAccess.PDF More Documents & Publications Silver Spring Networks comments on DOE NBP RFI: Data Access...

369

PIA - Foreign Access Central Tracking System (FACTS) | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Access Central Tracking System (FACTS) PIA - Foreign Access Central Tracking System (FACTS) PIA - Foreign Access Central Tracking System (FACTS) PIA - Foreign Access Central...

370

ETTP Security Access Control System (ESACS) | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

ETTP Security Access Control System (ESACS) ETTP Security Access Control System (ESACS) ETTP Security Access Control System (ESACS) ETTP Security Access Control System (ESACS) More...

371

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-15)  

SciTech Connect

BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission lines. Work also includes clearing of a small (<1/4 mile) section of access road. All work will be in accordance with the National Electrical Safety Code and BPA standards. See Section 1.1 of the attached checklist for detailed information on each section of the referenced transmission lines. BPA will conduct the vegetation control with the goal of removing tall-growing vegetation that is currently or will soon be a hazard to the transmission lines and where possible to promote low-growing plant communities in the right-of-way. This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and Record of Decision (ROD). The vegetation needing control is mainly Douglas Fir, Alder, and blackberries as indicated in Section 1.2 of the attached checklist. The work involved in the ROW includes: clearing tall growing vegetation that is currently or will soon pose a hazard to the lines; treating the associated stumps and re-sprouts with herbicide to ensure that the roots are killed preventing new sprouts; and selectively eliminating tall growing vegetation before it reaches a height or density to begin competing with low-growing vegetation. All work will take place in existing rights-of-ways and around transmission structures. All work will be accomplished by selective vegetation control methods to assure that there is little potential harm to non-target vegetation and to low-growing plants. The work will provide system reliability and fire protection. Also, all off right-of-way trees that are potentially unstable and will fall within a minimum distance or into the zone where the conductors swing will be removed. Access roads will be treated using mowing and herbicide applications. The work will provide system reliability. The subject transmission lines range from 115kV to 230kV and are made up of accompanying access roads, steel and wooden transmission line structures and associated switching platforms. The minimum clearance ranges from 21 feet for 115kV lines to 23 feet for 230kV lines. ROW easement widths vary along the length of the project. Vegetation control for this project is designed to provide a 3 year maintenance free interval. In summary, the overall vegetation management scheme will be to selectively remove tall growing vegetation then apply selective herbicide treatment using cut stump applications.

N /A

2001-06-19T23:59:59.000Z

372

USRI Admins Accessing USRI Reports  

E-Print Network (OSTI)

button #12;Step 6: Search by Instructor Search Area Enter: Instructors ID; or Instructors full or partC Access Enter the following: User name, and Password with secure ID#s #12;Step 3: Click on the following: Mandatory Parameters Selections Select Term; Select Course Career; Select Releasable Type; Click

Habib, Ayman

373

Flexible access control for javascript  

Science Conference Proceedings (OSTI)

Providing security guarantees for systems built out of untrusted components requires the ability to define and enforce access control policies over untrusted code. In Web 2.0 applications, JavaScript code from different origins is often combined on a ... Keywords: delimited histories, javascript, same-origin policy, security

Gregor Richards, Christian Hammer, Francesco Zappa Nardelli, Suresh Jagannathan, Jan Vitek

2013-10-01T23:59:59.000Z

374

Inventory and Sediment Modeling of Unpaved Roads for Stream Conservation Planning  

E-Print Network (OSTI)

for the Mapping and Inventory of Riparian Areas in the Upperstudy watershed using the road inventory geodatabase. Oncebe compared to species inventory data, stream bank erosion

Inlander, Ethan; Clingenpeel, Alan; Crump, Michael A.; Van Epps, Matthew; Formica, Sandi

2007-01-01T23:59:59.000Z

375

An integrated approach for precise road reconstruction from aerial imagery and LiDAR data.  

E-Print Network (OSTI)

??Accurate and detailed road models play an important role in a number of geospatial applications, such as infrastructure planning, traffic monitoring, and driver assistance systems.… (more)

Jin, Hang

2011-01-01T23:59:59.000Z

376

CX-008789: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

89: Categorical Exclusion Determination 89: Categorical Exclusion Determination CX-008789: Categorical Exclusion Determination Routine Maintenance of Curecanti-Lost Canyon 230 Kilovolt Access Roads and Western Area Power Administration Right-of-Way in Montrose, Ouray, San Miguel, Dolores, and Montezuma Counties, Colorado CX(s) Applied: B1.3 Date: 05/22/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) proposes to perform routine maintenance of existing access roads and right-of-way (ROW) along the Curecanti-Lost Canyon (CCI-LCN) 230-kilovolt (kV) transmission line at structures 0/2 to 1/3, 3/2, 8/1, 8/6, 9/6 to 9/7, 12/2 to 14/2, 15/5, 17/2, 17/3, 36/5, 37/1, 43/2, 47/2, 47/4, and 56/4 (approximately 60 miles).

377

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Routine Maintenance of Curecanti-Lost Canyon 230-kV Access Roads and Western Area Power Administration Right-of-Way in Montrose, Ouray, San Miguel, Dolores, and Montezuma Counties, Colorado 1 A. Brief Description of Proposal: Western Area Power Administration (Western) proposes to perform routine maintenance of existing access roads and right-of-way (ROW) along the Curecanti-Lost Canyon (CCI-LCN) 230-kilovolt (kV) transmission line at structures 0/2 to 1/3, 3/2, 8/1, 8/6, 9/6 to 9/7, 12/2 to 14/2, 15/5, 17/2, 17/3, 36/5, 37/1, 43/2, 47/2, 47/4, and 56/4 (approximately 60 miles). The project is located on private, U.S. Bureau of Land Management (BLM), State of Colorado, and U.S. Forest Service (USFS) lands in Montrose, Ouray, San Miguel, Dolores, and Montezuma

378

Final joint environmental assessment for the construction and routine operation of a 12-kilovolt (KV) overhead powerline right-of-way, and formal authorization for a 10-inch and 8-inch fresh water pipeline right-of-way, Naval Petroleum Reserve No. 1, Kern County, California  

SciTech Connect

The purpose and need of the proposed action, which is the installation of an overhead powerline extension from an Naval Petroleum Reserve No. 1 (NPR-1) power source to the WKWD Station A, is to significantly reduce NPR-1`s overall utility costs. While the proposed action is independently justified on its own merits and is not tied to the proposed NPR-1 Cogeneration Facility, the proposed action would enable DOE to tie the NPR-1 fresh water pumps at Station A into the existing NPR-1 electrical distribution system. With the completion of the cogeneration facility in late 1994 or early 1995, the proposed action would save additional utility costs. This report deals with the environmental impacts of the construction of the powerline and the water pipeline. In addition, information is given about property rights and attaining permission to cross the property of proposed affected owners.

1994-10-01T23:59:59.000Z

379

U.S. DOE Turbine Program Stakeholder Road Mapping Session  

NLE Websites -- All DOE Office Websites (Extended Search)

U.S. DOE Turbine Program Stakeholder Road Mapping Session U.S. DOE Turbine Program Stakeholder Road Mapping Session July 29-30, 2003 Table of Contents Disclaimer Papers and Presentations Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government or any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof.

380

Radiological survey results at 4400 Piehl Road, Ottawa Lake, Michigan  

SciTech Connect

At the request of the US Department of Energy (DOE), a team from Oak Ridge National Laboratory conducted a radiological survey at 4400 Piehl Road in Ottawa Lake, Michigan. The survey was performed in September, 1992. The purpose of the survey was to determine if materials containing uranium from work performed under government contract at the former Baker Brothers facility in Toledo, Ohio had been transported off-site to this neighboring area. The radiological survey included surface gamma scans indoors and outdoors, alpha and beta scans inside the house and attached garage, beta-gamma scans of the hard surfaces outside, and the collection of soil, water, and dust samples for radionuclide analyses. Results of the survey demonstrated that the majority of the measurements on the property were within DOE guidelines. However, the presence of isolated spots of uranium contamination were found in two areas where materials were allegedly transported to the property from the former Baker Brothers site. Uranium uptake by persons on the property by ingestion is fairly unlikely, but inhalation is a possibility. Based on these findings, it is recommended that the residential property at 4400 Piehl Road in Ottawa Lake, Michigan be considered for inclusion under FUSRAP.

Foley, R.D.; Johnson, C.A.

1993-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "right-of-way access roads" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

SunShot Initiative: Access to Capital  

NLE Websites -- All DOE Office Websites (Extended Search)

Access to Capital to someone by Access to Capital to someone by E-mail Share SunShot Initiative: Access to Capital on Facebook Tweet about SunShot Initiative: Access to Capital on Twitter Bookmark SunShot Initiative: Access to Capital on Google Bookmark SunShot Initiative: Access to Capital on Delicious Rank SunShot Initiative: Access to Capital on Digg Find More places to share SunShot Initiative: Access to Capital on AddThis.com... Concentrating Solar Power Photovoltaics Systems Integration Balance of Systems Reducing Non-Hardware Costs Lowering Barriers Fostering Growth Access to Capital Photo of a room full of people seated in rows with a few standing in the background. Two hands in the crowd are holding up sheets of paper with 'Like'. Participants at the SunShot Summit breakout session "Big and Small Ideas:

382

Non-road Electric Transportation Industry Advisory Council: July 28-29, 2009 Meeting Proceedings  

Science Conference Proceedings (OSTI)

EPRI's Non-road Electric Transportation Industry Advisory Council brings together industry's stakeholders to promote non-road electrification. The Council's July 28-29, 2009 meeting included stakeholders from utilities, public agencies and manufacturers. The presentations dealt with batteries, lift trucks, utility vehicles, agriculture vehicles, and ground support equipment.

2009-10-01T23:59:59.000Z

383

On-Road Remote Sensing of Automobile Emissions in the Los Angeles Area: Year 3  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Los Angeles Area: Year 3 (Riverside) Sajal S., Suite 140 Alpharetta, GA. 30022 Contract No. E-23-4 #12;On-Road Remote Sensing in the Los Angeles Area sensing study in the Los Angeles, CA area. The remote sensor used in this study is capable of measuring

Denver, University of

384

On-Road Remote Sensing of Automobile Emissions in the Los Angeles Area  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Los Angeles Area: Year 1 Gary A. Bishop a nine-day remote sensing study in the Los Angeles, CA area in the summer of 1999. The remote sensor used study to characterize motor vehicle emissions and deterioration in the Los Angeles area. On-Road Remote

Denver, University of

385

ON-ROAD REMOTE SENSING OF CO AND HC EMISSIONS IN CALIFORNIA  

E-Print Network (OSTI)

#12;ON-ROAD REMOTE SENSING OF CO AND HC EMISSIONS IN CALIFORNIA Final Report Contract No. A032 in fulfillment of A032-093, On-Road Remote Sensing of CO and HC Emissions in California by the University to accelerations and cruises entering a freeway ramp at highway speeds. The remote sensing device measures the CO

Denver, University of

386

On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 5,  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 5, November 2004 Gary A, Suite 140 Alpharetta, Georgia 30022 Contract No. E-23-9 #12;On-Road Remote Sensing of Automobile-day remote sensing study in the Phoenix, AZ area in the fall of 2004. The remote sensor used in this study

Denver, University of

387

On-Road Remote Sensing of Automobile Emissions in the Chicago Area: Year 4  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Chicago Area: Year 4 Sajal S. Pokharel, Gary Alpharetta, Georgia 30022 Contract No. E-23-4 #12;On-Road Remote Sensing in the Chicago Area: Year 4 2 EXECUTIVE SUMMARY The University of Denver has completed the first four years of a multi-year remote sensing

Denver, University of

388

On-Road Remote Sensing of Automobile Emissions in the LaBrea Area: Year 2  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the LaBrea Area: Year 2 Mitchell J. Williams 140 Alpharetta, Georgia 30022 Contract No. E-23-4 #12;On-Road Remote Sensing of Automobile Emissions in the LaBrea Area: Year 2 1 EXECUTIVE SUMMARY The University of Denver conducted a five-day remote sensing

Denver, University of

389

On-Road Remote Sensing of Automobile Emissions in the Chicago Area: Year 5,  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Chicago Area: Year 5, September 2002 Gary A five years of a multi-year remote sensing study in the Chicago area, with measurements made as to the extent I/M programs and #12;On-Road Remote Sensing in the Chicago Area: Year 5 2 special fuels contribute

Denver, University of

390

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 4,  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 4, January 2003 Daniel A year of a multi-year remote sensing study in the Denver area. The remote sensor used in this study channel was somewhat significant. #12;On-Road Remote Sensing in the Denver Area: Year 4 2 INTRODUCTION

Denver, University of

391

On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 3  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 3 Sajal S. Pokharel, Gary Alpharetta, Georgia 30022 Contract No. E-23-4 #12;On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 3 1 EXECUTIVE SUMMARY The University of Denver conducted a five-day remote sensing

Denver, University of

392

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 5,  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 5, January 2005 Gary A, Suite 140 Alpharetta, Georgia 30022 Contract No. E-23-9 #12;On-Road Remote Sensing of Automobile-day remote sensing study in the Denver, CO area in the winter of 2005. The remote sensor used in this study

Denver, University of

393

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 2  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 2 Sajal S. Pokharel, Gary A Alpharetta, Georgia 30022 CRC Project No. E-23-4 #12;On-Road Remote Sensing in the Denver Area: Year 2 2 EXECUTIVE SUMMARY The University of Denver has completed the second year of a five-year remote sensing study

Denver, University of

394

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 6,  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 6, January 2007 Gary A 80208 June 2007 #12;On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 6 1 EXECUTIVE SUMMARY The University of Denver conducted a three-day remote sensing study in the Denver, CO area

Denver, University of

395

On-Road Remote Sensing of Automobile Emissions in the Chicago Area: Year 3  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Chicago Area: Year 3 Sajal S. Pokharel, Gary Alpharetta, Georgia 30022-8246 Contract No. E-23-4 #12;On-Road Remote Sensing in the Chicago Area: Year 3 2 EXECUTIVE SUMMARY The University of Denver has completed the first three years of a five-year remote sensing

Denver, University of

396

On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 2  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 2 Sajal S. Pokharel, Gary Alpharetta, Georgia 30022 Contract No. E-23-4 #12;On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 2 1 EXECUTIVE SUMMARY The University of Denver conducted a five-day remote sensing

Denver, University of

397

On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 1  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 1 Gary A. Bishop, Sajal S-day remote sensing study in the Phoenix, AZ area in the fall of 1998. The remote sensor used in this study selected for 1999. On-Road Remote Sensing in the Phoenix Area: Year 1 2 #12;INTRODUCTION Many cities

Denver, University of

398

On-Road Remote Sensing of Automobile Emissions in the Chicago Area: Year 1  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Chicago Area: Year 1 Peter J. Popp, Gary A, Georgia 30346 Contract No. E-23-4 #12;On-Road Remote Sensing in the Chicago Area: Year 1 2 EXECUTIVE SUMMARY The University of Denver conducted a five-day remote sensing study in the Chicago area in the fall

Denver, University of

399

On-Road Remote Sensing of Automobile Emissions in the Los Angeles Area: Year 2  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Los Angeles Area: Year 2 Sajal S. Pokharel Alpharetta, GA. 30022 Contract No. E-23-4 #12;On-Road Remote Sensing in the Los Angeles Area: Year 2 2 EXECUTIVE SUMMARY The University of Denver conducted the second year of a five year remote sensing study

Denver, University of

400

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 3  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 3 Sajal S. Pokharel, Gary A Alpharetta, Georgia 30022 CRC Project No. E-23-4 #12;On-Road Remote Sensing in the Denver Area: Year 3 2 EXECUTIVE SUMMARY The University of Denver has completed the third year of a multi-year remote sensing study

Denver, University of

Note: This page contains sample records for the topic "right-of-way access roads" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

On-Road Remote Sensing of Automobile Emissions in the Chicago Area: Year 6,  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Chicago Area: Year 6, September 2004 Gary A, Suite 140 Alpharetta, Georgia 30022 Contract No. E-23-9 #12;On-Road Remote Sensing in the Chicago Area-year remote sensing study in the Chicago area, with measurements made in September of 1997 through 2000, 2002

Denver, University of

402

On-Road Remote Sensing of Automobile Emissions in the La Brea Area: Year 3,  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the La Brea Area: Year 3, October 2003 Gary A, Suite 140 Alpharetta, Georgia 30022 Contract No. E-23-4 #12;On-Road Remote Sensing in the La Brea Area: Year 3 1 EXECUTIVE SUMMARY The University of Denver conducted a five-day remote sensing study in the La

Denver, University of

403

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 1  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 1 Peter J. Popp, Sajal S Center Parkway Atlanta, Georgia 30346 CRC Project No. E-23-4-99 #12;On-Road Remote Sensing in the Denver-year remote sensing study in the Denver area. The remote sensor used in this study is capable of measuring

Denver, University of

404

On-Road Remote Sensing of Automobile Emissions in the Chicago Area: Year 2  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Chicago Area: Year 2 Peter J. Popp, Gary A Atlanta, Georgia 30346 Contract No. E-23-4 #12;On-Road Remote Sensing in the Chicago Area: Year 2 2 EXECUTIVE SUMMARY The University of Denver has completed the first two years of a five-year remote sensing

Denver, University of

405

On-Road Remote Sensing of Automobile Emissions in west Los Angeles: Year 4,  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in west Los Angeles: Year 4, October 2005 Gary A Alpharetta, Georgia 30022 Contract No. E-23-9 #12;On-Road Remote Sensing in west Los Angeles: Year 4 1 EXECUTIVE SUMMARY The University of Denver conducted a five-day remote sensing study in west Los Angeles

Denver, University of

406

On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 4,  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 4, November 2002 Gary A conducted a five-day remote sensing study in the Phoenix, AZ area in the fall of 2002. The remote sensor #12;On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 4 2 by 5 years

Denver, University of

407

On-Road Remote Sensing of Automobile Emissions in the Omaha Area: Year 2,  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Omaha Area: Year 2, September 2004 Gary A of the work. #12;On-Road Remote Sensing in the Omaha Area: Year 2 2 EXECUTIVE SUMMARY The University of Denver conducted a five-day remote sensing study in the Omaha, Nebraska area in September of 2004. The remote

Denver, University of

408

Baroclinic instability of the Silk Road pattern induced by thermal damping  

Science Conference Proceedings (OSTI)

In this paper, the internal dynamics of the Silk Road pattern has been studied. Since observation indicates that the Silk Road pattern could be considered as stationary external Rossby waves, the quasi-geostrophic three-layer model has been used ...

Guosen Chen; Ronghui Huang; Liantong Zhou

409

Non-road Industry Advisory Council: August 26-27, 2008 Meeting  

Science Conference Proceedings (OSTI)

EPRI's Non-Road Transportation Industry Advisory Council brings together industry's stakeholders to promote non-road electrification. The Council's August 26-27, 2008 meeting included stakeholders from utilities, public agencies and manufacturers. The presentations dealt with batteries, lift trucks, utility vehicles, agriculture vehicles, and ground support equipment.

2008-10-16T23:59:59.000Z

410

Market Assessments of Non-Road Electrotechnologies for Air Quality Improvement  

Science Conference Proceedings (OSTI)

Past studies conducted by the Electric Power Research Institute (EPRI) and ICF International (ICF) have revealed opportunities to reduce emissions and fuel consumption of non-road vehicles and stationary goods-moving equipment by converting them to electric drive. These studies have shown that electrically driven non-road equipment can lessen the environmental impact of user operations and reduce end-user ...

2012-09-30T23:59:59.000Z

411

A Simulation Tool for Combined Rail-Road Transport in Intermodal Terminals  

E-Print Network (OSTI)

A Simulation Tool for Combined Rail-Road Transport in Intermodal Terminals Andrea E. Rizzoli the current flows of freight. On the other side, the growth of freight transport shows a rapidly increasing by road and rail gates and by a set of platforms. Intermodal terminals are inter-connected by rail

Gambardella, Luca Maria

412

Rules of the Road for Users of Smithsonian Computers and Networks  

E-Print Network (OSTI)

Rules of the Road for Users of Smithsonian Computers and Networks Introduction Smithsonian systems, networks and other computer resources are shared among Smithsonian employees, interns, visiting scholars the Internet. The Rules of the Road are intended to help you use the Smithsonian's computing and network

Mathis, Wayne N.

413

Toolkit for Public-Private Partnerships in Roads and Highways | Open Energy  

Open Energy Info (EERE)

form form View source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit with form History Facebook icon Twitter icon » Toolkit for Public-Private Partnerships in Roads and Highways Jump to: navigation, search Tool Summary Name: Toolkit for Public-Private Partnerships in Roads and Highways Agency/Company /Organization: World Bank Sector: Energy Focus Area: Transportation Resource Type: Guide/manual User Interface: Website Website: www.ppiaf.org/ppiaf/sites/ppiaf.org/files/documents/toolkits/highwayst Cost: Free Toolkit for Public-Private Partnerships in Roads and Highways Screenshot References: Toolkit for Public-Private Partnerships in Roads and Highways[1] "The Toolkit for Public-Private Partnership in Roads and Highways is to

414

USVI Energy Road Map: Charting the Course to a Clean Energy Future  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

USVI Energy Road Map: Charting the Course to a Clean Energy Future USVI Energy Road Map: Charting the Course to a Clean Energy Future (Brochure), EDIN (Energy Development in Island Nations), U.S. Virgin Islands USVI Energy Road Map: Charting the Course to a Clean Energy Future (Brochure), EDIN (Energy Development in Island Nations), U.S. Virgin Islands This brochure provides an overview of the integrated clean energy deployment process and progress of the Energy Development in Island Nations U.S. Virgin Islands pilot project road map, including over-arching goals, organization, strategy, technology-specific goals and accomplishments, challenges, solutions, and upcoming milestones. edinusvi_roadmap.pdf More Documents & Publications U.S. Virgin Islands Energy Road Map: Analysis Integrating Renewable Energy into the Transmission and Distribution System

415

DEPARTMENT OF ENERGY FINDING OF NO SIGNIFICANT IMPACT FOR THE MULTIPURPOSE HAUL ROAD  

NLE Websites -- All DOE Office Websites (Extended Search)

DEPARTMENT OF ENERGY FINDING OF NO SIGNIFICANT IMPACT FOR THE MULTIPURPOSE HAUL ROAD WITHIN THE IDAHO NATIONAL LABORATORY SITE (EM-FMDP-I0-068) Agency: U. S. Department of Energy (DOE) Action: Finding of No Significant Impact (FONSI) Summary: The DOE prepared a Draft Environmental Assessment (EA) for the proposed "Environmental Assessment for the Multipurpose Haul Road Within the Idaho National Laboratory Site" (DOE/EA-I772). The proposed action consists of constructing a road for limited year-round use with the ability for trucks traveling in opposite directions to pass. The analysis of the proposed road evaluates clearing and grading a base, installing necessary culverts and drainage, and placing and compacting gravel for the roadway. The haul road would be used to:

416

USVI Energy Road Map: Charting the Course to a Clean Energy Future  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

USVI Energy Road Map: Charting the Course to a Clean Energy Future USVI Energy Road Map: Charting the Course to a Clean Energy Future (Brochure), EDIN (Energy Development in Island Nations), U.S. Virgin Islands USVI Energy Road Map: Charting the Course to a Clean Energy Future (Brochure), EDIN (Energy Development in Island Nations), U.S. Virgin Islands This brochure provides an overview of the integrated clean energy deployment process and progress of the Energy Development in Island Nations U.S. Virgin Islands pilot project road map, including over-arching goals, organization, strategy, technology-specific goals and accomplishments, challenges, solutions, and upcoming milestones. edinusvi_roadmap.pdf More Documents & Publications U.S. Virgin Islands Energy Road Map: Analysis Integrating Renewable Energy into the Transmission and Distribution System

417

Comparison of dynamometer power absorption characteristics and vehicle road load measurements  

SciTech Connect

The report presents vehicle road load force versus speed curves and Clayton dynamometer force versus speed curves. The vehicle road load force data were collected in the recent road load project, where the vehicle road load, as a function of speed, was determined for sixty-three light-duty vehicles. The dynamometer data were obtained from the six EPA certification dynamometers. This data is first used to generate an equation to represent an average emission dynamometer. The variations of the individual dynamometers about this average dynamometer curve are discussed. Subsequently, each vehicle curve is compared to this average dynamometer curve. Variations between different vehicles are discussed, and the possible intrinsic error caused by differences between the shape of the dynamometer force versus speed curve and the typical vehicle road load curve is investigated.

Thompson, G.D.; Torres, M.

1977-07-01T23:59:59.000Z

418

An Access Definition and Query Language : Towards a Unified Access Control Model.  

E-Print Network (OSTI)

??In this work we suggest a meta access control model emulating established access control models by configuration and offering enhanced features like the delegation of… (more)

Sonnenbichler, Andreas

2013-01-01T23:59:59.000Z

419

Harmonization of Road Signs for Electric Vehicle Charging Stations  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Avenue Louise 200 Box 113 1050 Brussels Belgium 1 Avenue Louise 200 Box 113 1050 Brussels Belgium 1 32.2.647.3218 Mobile 32.473.284.603 jseisler@cleanfuelsconsulting.org www.cleanfuelsconsulting.org Harmonization of Road Signs for Electric Vehicle Charging Stations Prepared for: Argonne National Laboratory and the U.S. Department of Energy November 2012 Avenue Louise 200 Box 113 1050 Brussels Belgium 2 32.2.647.3218 Mobile 32.473.284.603 jseisler@cleanfuelsconsulting.org www.cleanfuelsconsulting.org This page is intentionally blank. Avenue Louise 200 Box 113 1050 Brussels Belgium 3 32.2.647.3218 Mobile 32.473.284.603 jseisler@cleanfuelsconsulting.org www.cleanfuelsconsulting.org TABLE OF CONTENTS ACKNOWLEDGMENTS ............................................................................................................. 5

420

Meeting Location: Las Vegas, NV- DOE Office at Lossee Road  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11 11 th EM QUALITY ASSURANCE CORPORATE BOARD MEETING Meeting Location: Las Vegas, NV- DOE Office at Lossee Road With Limited Conference Call Capabilities Room: 6404 Agenda for May 1, 2012 1:00-1:15 pm Agenda, Introductions, Status of Action Items from Last Board Meeting Bob Murray (EM-43) 1:15-1:35 pm Discussion and Summary of the Site ISM/QA Declarations Steven Ross (EM-43) 1:35-2:05 pm Status of Phase II Follow-up Reviews for Field Offices including Use and Status of the Standard Review Plan Bob Toro (EM-43) 2:05-2:35 pm Overview of EM QA Program (as provided to DNFSB) Matthew Moury (EM-40) Bob Murray (EM-43) 2:35-3:05 pm (BOARD VOTE)

Note: This page contains sample records for the topic "right-of-way access roads" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

HCEI Road Map and Introduction and Overview 2011  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Edition Edition Introduction & Overview HCEI Road Map 12% 10% 8% 6% 4% 2% 0% 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 *Estimated HAWAII ENERGY COSTS BY PERCENT GDP 80% 70% 60% 50% 40% 30% 20% 10% Hawaii Alaska Florida Lousiana Kentucky Montana Source: FIA 906 January - June 2010 PETROLEUM DEPENDENCE FOR ELECTRICITY TOP SIX STATES 0% Hawaii is the most petroleum-dependent state in the U.S. As a result, we have America's highest energy prices. Energy costs are 10% of our gross State product. Roughly 96% of the $4 billion we spend on petroleum not only leaves the State, but goes to countries in Asia and Africa. Hawaii's economic vitality is reduced by approximately $2.75 for every dollar that leaves our islands. This is a result of a multiplier effect that impacts

422

Reducing the environmental impact of road and rail vehicles  

Science Conference Proceedings (OSTI)

Methods have been developed to measure in situ the dynamic impact of both road and rail vehicles on the infrastructure and the environment. The resulting data sets have been analysed to quantify the environmental impacts in a transparent manner across both modes. A primary concern is that a small number of vehicles are being operated outside safe or regulatory limits which can have a disproportionate large impact. The analysis enables the various impacts to be ranked across both modes so enabling one to discern the benefits of intermodal transport. The impact of various policy options is considered and how to identify vehicles which can be classified as environmentally friendly. This would require European agreement as many heavy goods vehicle operate across country borders.

Mayer, R.M., E-mail: r.m.mayer@reading.ac.uk [Sciotech Projects, Sciotech Office, Engineering Building, University of Reading, Reading RG6 6AY (United Kingdom); Poulikakos, L.D., E-mail: lily.poulikakos@empa.ch [Empa, Swiss Federal Laboratories for Materials Science and Technology, Ueberlandstrasse 129, CH-8600 Duebendorf (Switzerland); Lees, A.R., E-mail: Andy.Lees@dft.gsi.gov.uk [Department for Transport, Statistics Roads Division, Gt. Minster House, 76 Marsham Street, London SW1P 4DR (United Kingdom); Heutschi, K., E-mail: kurt.heutschi@empa.ch [Empa, Swiss Federal Laboratories for Materials Science and Technology, Ueberlandstrasse 129, CH-8600 Duebendorf (Switzerland); Kalivoda, M.T., E-mail: kalivoda@psia.at [psiA-Consult GmbH, Lastenstrasse 38/1, A-1230 Vienna (Austria); Soltic, P., E-mail: patrik.soltic@empa.ch [Empa, Swiss Federal Laboratories for Materials Science and Technology, Ueberlandstrasse 129, CH-8600 Duebendorf (Switzerland)

2012-01-15T23:59:59.000Z

423

NBP RFI: Data Access | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Access NBP RFI: Data Access Reply comments from Cleco Power LLC on DOE Request for Information-Implementing the National Broadband Plan by Empowering Customers and the Smart Grid:...

424

arXiv.org help - Web Accessibility  

NLE Websites -- All DOE Office Websites (Extended Search)

Web Accessibility The arXiv.org web site is designed to work on the largest possible set of browsers and platforms, and to be accessible to users with disabilities. Our web pages...

425

Access Solar Energy LLC | Open Energy Information  

Open Energy Info (EERE)

Access Solar Energy LLC Jump to: navigation, search Name Access Solar Energy LLC Place Park CIty, Utah Zip 84060 Sector Renewable Energy, Solar Product Utah-based developers of...

426

Game Accessibility: Enabling Everyone to Play  

Science Conference Proceedings (OSTI)

There is a growing push to make computer games accessible to the disabled. Keywords: Games,Assistive technology,Assistive devices,game developers,games,accessibility,disabilities,disabled,adaptive technology

Lee Garber

2013-06-01T23:59:59.000Z

427

Access Control: Policies, Models, and Mechanisms  

Science Conference Proceedings (OSTI)

Access control is the process of mediating every request to resources and data maintained by a system and determining whether the request should be granted or denied. The access control decision is enforced by a mechanism implementing regulations established ...

Pierangela Samarati; Sabrina De Capitani di Vimercati

2000-09-01T23:59:59.000Z

428

Survey of Substation Equipment Access Control Policies  

Science Conference Proceedings (OSTI)

Utility management and control of access to substations and equipment can help prevent not only unauthorized access by outside agents with ill intent, but also erroneous access to, or erroneous operation of, utility equipment by utility personnel.  This report provides the results of an EPRI–sponsored research project to identify how utilities manage access to transmission and distribution substations and equipment. BackgroundThe enhanced ...

2012-11-20T23:59:59.000Z

429

Substation Security and Remote Access Implementation Strategies  

Science Conference Proceedings (OSTI)

This project analyzed control system remote access solutions in a side-by-side comparison. Five systems were lab-tested against common functions used by utilities to access and manage electronic control systems. The five vendors’ products met the basic remote access requirements tested.BackgroundElectronic control systems that actuate protective equipment and physical operations in the ...

2012-12-20T23:59:59.000Z

430

A propositional policy algebra for access control  

Science Conference Proceedings (OSTI)

Security-sensitive environments protect their information resources against unauthorized use by enforcing access control mechanisms driven by access control policies. Due to the need to compare, contrast, and compose such protected information resources, ... Keywords: Access control, policy algebra, policy composition, security policy

Duminda Wijesekera; Sushil Jajodia

2003-05-01T23:59:59.000Z

431

Programmer-focused website accessibility evaluations  

Science Conference Proceedings (OSTI)

Suggested methods for conducting website accessibility evaluations have typically focused on the needs of end-users who have disabilities. However, programmers, not people with disabilities, are the end-users of evaluations reports generated by accessibility ... Keywords: accessibility, evaluation, internet, reporting

Chris Law; Julie Jacko; Paula Edwards

2005-10-01T23:59:59.000Z

432

A systematic approach to static access control  

Science Conference Proceedings (OSTI)

The Java Security Architecture includes a dynamic mechanism for enforcing access control checks, the so-called stack inspection process. While the architecture has several appealing features, access control checks are all implemented via dynamic ... Keywords: Type systems, access control, stack inspection

François Pottier; Christian Skalka; Scott Smith

2005-03-01T23:59:59.000Z

433

Microsoft Word - CX-McNary-Ross_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

15, 2010 15, 2010 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Elizabeth Johnson - TFR-The Dalles Natural Resource Specialist Proposed Action: Perform routine access road maintenance within the McNary-Ross No. 1 transmission line corridor Budget Information: Work Order # WO-00261150-01 PP&A Project No.: PP&A 1694 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads, equipment... routine maintenance activities, corrective....are required to maintain... infrastructures...in a condition suitable for a facility to be used for its designed purpose. Proposed by: Bonneville Power Administration (BPA)

434

Microsoft Word - CX-Rattlesnake-Garrison I-90 Crossing_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2010 3, 2010 REPLY TO ATTN OF: KEPR-Bell-1 SUBJECT: Environmental Cleareance Memorandum Dustin Liebhaber Project Manager - TELP-TPP-3 Proposed Action: Installation of wood pole structure on the Rattlesnake-Garrison No. 1 230-kV transmission line PP&A Project No: 1656 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021):  B1.13 Construction, acquisition, and relocation of onsite pathways and short onsite access roads and railroads.  B1.3 Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads, equipment...routine maintenance activities, corrective....are required to maintain...infrastructures...in a condition suitable for a facility to be used for its designed purpose.

435

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11 - 6320 of 26,764 results. 11 - 6320 of 26,764 results. Page Categorical Exclusion Determinations: B1.32 B1.32: Traffic flow adjustmentsTraffic flow adjustments to existing roads (including, but not limited to, stop sign or traffic light installation, adjusting direction of traffic flow, and adding... http://energy.gov/nepa/categorical-exclusion-determinations-b132 Page Categorical Exclusion Determinations: B1.13 B1.13: Pathways, short access roads, and rail linesConstruction, acquisition, and relocation, consistent with applicable right-of-way conditions and approved land use or transportation improvement... http://energy.gov/nepa/categorical-exclusion-determinations-b113 Download CX-004892: Categorical Exclusion Determination Oracle-Tucson Transmission Line Structure Relocation

436

CX-006583: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Categorical Exclusion Determination 3: Categorical Exclusion Determination CX-006583: Categorical Exclusion Determination Wood Pole Replacement Along Portions of the Grand Coulee-Chief Joseph #1 and #2 230-Kilovolt Transmission Line CX(s) Applied: B1.3, B1.13 Date: 08/22/2011 Location(s): Douglas County, Washington Office(s): Bonneville Power Administration Maintenance activities will take place within the existing transmission line right-of-way easement and include upgrading existing access roads, relocating or constructing short spur roads to structures, constructing equipment landings and performing maintenance on structures. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-006583.pdf More Documents & Publications CX-006580: Categorical Exclusion Determination CX-010424: Categorical Exclusion Determination

437

Form Approv  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

'JOE I' ':0 'JOE I' ':0 ) e " Flee/romc Form Approv ed by CGIR· 01120195 (8 ./1" United States Government Department of Energy Bonneville Power Administra ion memorandum DATE : uC l J !:' ZD y REPLY TO ATTN OF : KEP-4 SUBJECT: Environmental Clearance Memorandum TO ; Rob Ochs Project Manager - TELM-TPP-3 Proposed Action: Lane-Wendson No.1 Structure 10/5 Access Road Improvement and Pole Replacement Project Budget Information: Work Order # 224549 PP&A Project No.: 1117 Proposed by: Bonneville Power Administration (BPA) Categorical Exclusion Applied (from Sub part 0,10 C.F.R. Part) 021): B 1.3, Routine maintenance activities ... for structures, rights-of-way, infrastructures such as roads, equipment. .. routine maintenance activities, corrective ... .are required to maintain

438

Microsoft Word - CX_NBonneville-Alcoa_AR_PPA_1388_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Richard Heredia Richard Heredia Supervisory Civil Engineer - TELF-TPP-3 Proposed Action: Access Road Maintenance Project near structures 16/6, 16/7 and 17/1 of the N. Bonneville-Alcoa No. 1 & 2 transmission line corridor PP&A Project No.: 1388 Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads, equipment... routine maintenance activities, corrective....are required to maintain...infrastructures...in a condition suitable for a facility to be used for its designed purpose. Location: The project is located approximately 4 miles northeast of Washougal in Clark County, Washington, T1N, R4E, Sections 1 and 12. Proposed by: Bonneville Power Administration (BPA)

439

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

nAccess road improvement and bridge replacement for the Raver-Paul No. transmission line structure 18/1. Budget Information: Work Order # 00220048 PP&A Project No.: 954 Proposed by: Bonneville Power Administration (BPA) Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance activities .. .for structures, rights-of-way, infrastructures such as roads, equipment. .. routine maintenance activities, corrective ....are required to

440

Microsoft Word - CX-BigEddy-Ostrander_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 SUBJECT: Environmental Clearance Memorandum Elizabeth Johnson - TFR-The Dalles Natural Resource Specialist Proposed Action: Perform routine access road maintenance within the Big Eddy-Ostrander No. 1 transmission line corridor Budget Information: Work Order # 00261716 PP&A Project No.: PP&A 1706 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads, equipment... routine maintenance activities, corrective....are required to maintain... infrastructures...in a condition suitable for a facility to be used for its designed purpose. Proposed by: Bonneville Power Administration (BPA) Location: The project area is located along BPA's Big Eddy-Ostrander No. 1 transmission line

Note: This page contains sample records for the topic "right-of-way access roads" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to AuIt 230-kV Transmission Line Structnre Replacement, Weld Connty, Colorado to AuIt 230-kV Transmission Line Structnre Replacement, Weld Connty, Colorado A. Bl'ief Description of Proposal: Western Area Power Administration (Western) proposes to replace an existing three pole wood structure along the Archer to Ault 230-kV transmission line. The structure is located on private land adjacent to County Road 27 northwest of the town of Nunn in Weld County, Colorado. The structure will be replaced in-kind with wood poles of the same height, hardware, configuration, and at the same location. All work will be confined to Western's right-of- way easement. Existing access would be used and no new roads are proposed. Equipment used in the work includes pick-ups, truck mounted augers and cranes, bucket trucks, and skid steer loaders.

442

Microsoft Word - CX-GrandCoulee-Creston_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2011 5, 2011 REPLY TO ATTN OF: KEPR-Bell-1 SUBJECT: Environmental Clearance Memorandum Robert Keudell Robert Zeller Lineman Foreman III - TFWK-Grand Coulee Lineman Foreman I - TFWK-Grand Coulee Proposed Action: Selected wood pole replacement and minor access road maintenance along the Grand Coulee-Creston transmission line at miles 14, 15, 21 and 28. PP&A Project No: 1828 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities...for structures, rights of way, infrastructures such as roads, equipment...routine maintenance activities, corrective....are required to maintain... infrastructures... in a condition suitable for a facility to be used for its designed purpose.

443

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

:)£ F 13 :)£ F 13 ;' 5 H e Etectroou: Form Approved by CGJR - 01120195 (n·/w! United States Government Department of Energy Bonneville Power Administration memorandum DATE: 0 I. 7 20D 9 REPLY TO AnN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum TO : Robert Macy Project Manager - TELF-TPP-3 Proposed Action: Perform routine access road maintenance to the Rockdale Microwave site . Budget Information: Work Order #180709 PP&A Project No.: 1389 Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance activities .. .for structures, rights-of-way, infrastructures such as roads, equipment. .. routine maintenance activities, corrective .... are required to maintain ... infrastructures . ..in a condition suitable for a facility to be used for its designed purpose.

444

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

NLE Websites -- All DOE Office Websites (Extended Search)

to Ault 230-kV Transmission Line Structure Replacement, Weld County, Colorado to Ault 230-kV Transmission Line Structure Replacement, Weld County, Colorado A. Bl'ief Description of Proposal: Western Area Power Administration (Western) proposes to replace an existing three pole wood structure along the Archer to Ault 230-kV transmission line. The structure is located on private land adjacent to County Road 27 northwest of the town ofNunn in Weld County, Colorado. The structure will be replaced in-kind with wood poles of the same height, hardware, configuration, and at the same location. All work will be confined to Western's right-of- way easement. Existing access would be used and no new roads are proposed. Equipment used in the work includes pick-ups, truck mounted augers and cranes, bucket trucks, and skid steer loaders.

445

Transmission Access Charge Informational Filing  

E-Print Network (OSTI)

of any new Participating Transmission Owner (“Participating TO”) during the proceeding six months or (2) changes to Transmission Revenue Requirements of any of the Participating TOs. 1 Because the Access Charges are determined through a formula rate mechanism, these semi-annual adjustments take place automatically. In the enclosed informational filing, the ISO is providing notice regarding the updated Access Charges that reflect the charges that will be in effect beginning January 1, 2002 in accordance with the formula rate. The adjusted charges are based on the modified Transmission Revenue Requirements, both High Voltage and Low Voltage as a result of: (1) the Offer of Settlement accepted by the Commission in Pacific Gas & Electric Company’s (“PG&E”) Docket No. ER01-66-000, (2) San Diego Gas and Electric Company’s supplemental surcharge accepted, subject to refund, in Docket No. ER01-3074-000, and (3) the annual adjustment to the Transmission Revenue Balancing Account (“TRBA”) of the Participating TOs. 1 Capitalized terms not otherwise defined herein are defined in the Master Definitions

unknown authors

2001-01-01T23:59:59.000Z

446

Mission-Aware Medium Access Control in Random Access Networks  

E-Print Network (OSTI)

We study mission-critical networking in wireless communication networks, where network users are subject to critical events such as emergencies and crises. If a critical event occurs to a user, the user needs to send necessary information for help as early as possible. However, most existing medium access control (MAC) protocols are not adequate to meet the urgent need for information transmission by users in a critical situation. In this paer, we propose a novel class of MAC protocols that utilize available past information as well as current information. Our proposed protocols are mission-aware since they prescribe different transmission decision rules to users in different situations. We show that the proposed protocols perform well not only when the system faces a critical situation but also when there is no critical situation. By utilizing past information, the proposed protocols coordinate transmissions by users to achieve high throughput in the normal phase of operation and to let a user in a critical ...

Park, Jaeok

2009-01-01T23:59:59.000Z

447

Utility Data Accessibility Map | Open Energy Information  

Open Energy Info (EERE)

Utility Data Accessibility Map Utility Data Accessibility Map Jump to: navigation, search Residential Commercial Benchmarking Energy Efficiency Delivery of Data Time Period Frequency of Data Access to Data Residential frequency of data access Ua Utility Data Access Map Having access to your electricity use data is a very important step in understanding your overall energy usage. Comparing historical data to your current usage is one way to see trends and determine ways for reducing electricity costs and improving overall efficiency. We asked all U.S. electric utility companies to tell us how accessible their electricity use data is for both residential and commercial customers. The results are updated live based on the responses we have to date. As more utilities provide information, the utility boundaries will be automatically colored

448

Chapter_12_Special_Access_Programs  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Special Access Programs This chapter describes the DOE Special Access Program (SAP) at DOE HQ and implements the requirements of: * Executive Order 13526, Classified National Security Information, Section 4.3, Special Access Programs, and Section 5.4, General Responsibilities, subparagraph (d). * DOE Order 471.5, Special Access Programs. A SAP is a program established for a specific class of classified information that imposes safeguarding and access requirements exceeding those normally required for information at the same classification level. Terms and activities such as Limited Access, Controlled Access, and Limited Distribution programs are not authorized. HQ Implementation Procedures SAP administration for both DOE and NNSA is handled through the Executive

449

Access Fund Partners LP | Open Energy Information  

Open Energy Info (EERE)

Access Fund Partners LP Access Fund Partners LP Jump to: navigation, search Name Access Fund Partners, LP Place San Juan Capistrano, California Zip 92675 Product Boutique investment banking and investment advisory firm with clean energy focus References Access Fund Partners, LP[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Access Fund Partners, LP is a company located in San Juan Capistrano, California . References ↑ "Access Fund Partners, LP" Retrieved from "http://en.openei.org/w/index.php?title=Access_Fund_Partners_LP&oldid=341703" Categories: Clean Energy Organizations Companies Organizations Stubs What links here Related changes Special pages Printable version

450

On the impact of Gold Open Access journals  

Science Conference Proceedings (OSTI)

Gold Open Access (=Open Access publishing) is for many the preferred route to achieve unrestricted and immediate access to research output. However, true Gold Open Access journals are still outnumbered by traditional journals. Moreover availability of ... Keywords: Directory of Open Access journals (DOAJ), Gold Open Access, Impact analysis, Impact evolution, Journal citation reports (JCR), Journal impact factor, Open Access publishing, SJR, SNIP, Ulrichsweb

Christian Gumpenberger; María-Antonia Ovalle-Perandones; Juan Gorraiz

2013-07-01T23:59:59.000Z

451

Instructions for using HSPD-12 Authenticated Outlook Web Access...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

using HSPD-12 Authenticated Outlook Web Access (OWA) Instructions for using HSPD-12 Authenticated Outlook Web Access (OWA) Provides instructions for remote Outlook access using...

452

SPEED CONTROL SYSTEM FOR AN ACCESS GATE - Energy Innovation Portal  

An access control apparatus for an access gate. The access gate typically has a rotator that is configured to rotate around a rotator axis at a first ...

453

Where the Rubber Meets the Road -- the Alternative Fuel Station Locator |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Where the Rubber Meets the Road -- the Alternative Fuel Station Where the Rubber Meets the Road -- the Alternative Fuel Station Locator Where the Rubber Meets the Road -- the Alternative Fuel Station Locator August 10, 2010 - 2:32pm Addthis Dennis A. Smith Director, National Clean Cities Last week, this blog highlighted the highly efficient vehicles competing for the Automotive X Prize. The innovative designs on display in that competition may very well reflect the future of the auto industry, but there are many alternative vehicles already on the road, actively doing their part to cut emissions and improve efficiency. By decreasing the amount of petroleum we use for transportation and running our vehicles on alternative fuels, we can improve our country's social, economic, and environmental sustainability. However, those of us that drive

454

DOE Statement on UK Government's "Road to 2010" Report on Nuclear Security  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement on UK Government's "Road to 2010" Report on Nuclear Statement on UK Government's "Road to 2010" Report on Nuclear Security DOE Statement on UK Government's "Road to 2010" Report on Nuclear Security July 17, 2009 - 12:00am Addthis WASHINGTON, DC - Thomas P. D'Agostino, the Department of Energy's Under Secretary for Nuclear Security and Administrator of the National Nuclear Security Administration, today applauded the British government's new report on advancing the global nuclear security agenda. Issued yesterday, "The Road to 2010 - Addressing the Nuclear Question in the Twenty First Century" outlines a strategy for addressing the threat posed by the proliferation of nuclear weapons ahead of the 2010 Nuclear Non-Proliferation Treaty (NPT) Review Conference. Among other steps, it includes the creation of a UK Center for Nuclear

455

SITEWIDE CATEGORICAL EXCLUSION FOR MINOR ROAD AND UTILITY ALTERATIONS, PACIFIC NORTHWEST NATIONAL LABORATORY SITE,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 SITEWIDE CATEGORICAL EXCLUSION FOR MINOR ROAD AND UTILITY ALTERATIONS, PACIFIC NORTHWEST NATIONAL LABORATORY SITE, RICHLAND, WASHINGTON Proposed Action: The U.S. Department of Energy (DOE) Pacific Northwest Site Office (PNSO) proposes to conduct minor alteration, repair, ~lacement, or relocation of roads, pathways, and utilities such as water, sewer, electriCIty, natura1g8S, and communications lines. Location of Action: The proposed action would largely occur on the Pacific Northwest National Laboratory (PNNL) Site, within or near existing road and utility easements. Tie-ins to nearby offsite road and utility distribution points are occasionally necessary and are included in the scope of this categorical exclusion (CX). Description 01 tbe Proposed Action:

456

Climate Rapid Overview and Decision Support (C-ROADS) Simulator | Open  

Open Energy Info (EERE)

Climate Rapid Overview and Decision Support (C-ROADS) Simulator Climate Rapid Overview and Decision Support (C-ROADS) Simulator Jump to: navigation, search LEDSGP green logo.png FIND MORE DIA TOOLS This tool is part of the Development Impacts Assessment (DIA) Toolkit from the LEDS Global Partnership. Tool Summary LAUNCH TOOL Name: Climate Rapid Overview and Decision Support (C-ROADS) Simulator Agency/Company /Organization: Ventana Systems Inc., Massachusetts Institute of Technology, Sustainability Institute Partner: United States Department of Energy Sector: Climate, Energy Topics: Co-benefits assessment, - Macroeconomic, Pathways analysis Resource Type: Software/modeling tools User Interface: Desktop Application, Spreadsheet Complexity/Ease of Use: Moderate Website: climateinteractive.org/simulations/C-ROADS Cost: Free

457

Fuel Used for Off-Road Recreation: A Reassessment of the Fuel Use Model  

NLE Websites -- All DOE Office Websites (Extended Search)

Used for Off-Road Recreation: Used for Off-Road Recreation: A Reassessment of the Fuel Use Model Stacy C. Davis Lorena F. Truett Patricia S. Hu ORNL/TM-1999/100 Fuel Used for Off-Road Recreation: A Reassessment of the Fuel Use Model Stacy C. Davis Lorena F. Truett Patricia S. Hu July 1999 Prepared for the Office of Highway Information Management Federal Highway Administration U.S. Department of Transportation Washington, DC 20590 Prepared by the Statistics and Data Analysis Program Center for Transportation Analysis Oak Ridge National Laboratory Oak Ridge, TN 37831-6073 managed by Lockheed Martin Energy Research Corporation for the U.S. Department of Energy under Contract No. DE-AC05-96OR22464 Fuel Used for Off-Road Recreation: A Reassessment of the Fuel Use Model - iii - TABLE OF CONTENTS LIST OF ACRONYMS AND ABBREVIATIONS

458

A hub-based labeling algorithm for shortest paths in road networks  

Science Conference Proceedings (OSTI)

Abraham et al. [SODA 2010] have recently presented a theoretical analysis of several practical point-to-point shortest path algorithms based on modeling road networks as graphs with low highway dimension. They also analyze a labeling algorithm. While ...

Ittai Abraham; Daniel Delling; Andrew V. Goldberg; Renato F. Werneck

2011-05-01T23:59:59.000Z

459

NEPA REVIEW LASO-10-002 CATEGORICAL EXCLUSION PAJARITO ROAD RIGHT...  

National Nuclear Security Administration (NNSA)

relocated to the north of the new road segment pavement to minimize fi.rture maintenance costs and traffic disruption. The LANL Cultural Resources Team (CRT) has surveyed the...

460

U.S. Public Preferences for Weather and Road Condition Information  

Science Conference Proceedings (OSTI)

In 2008, the American Meteorological Society (AMS) Board on Enterprise Planning (BEP) established the Committee on Mobile Observations to discuss the application and utilization of mobile weather and road condition data in the context of supporting the ...

Sheldon Drobot; Amanda R. S. Anderson; Crystal Burghardt; Paul Pisano

Note: This page contains sample records for the topic "right-of-way access roads" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

ON-ROAD REMOTE SENSING OF VEHICLE EMISSIONS IN MONTERREY, N.L. MEXICO  

E-Print Network (OSTI)

ON-ROAD REMOTE SENSING OF VEHICLE EMISSIONS IN MONTERREY, N.L. MEXICO Final Report Prepared for the University of Denver traveled to Monterrey, N.L. Mexico to monitor remotely the carbon monoxide (CO

Denver, University of

462

Multi-criteria analysis : an alternative approach for the evaluation of road pricing strategies  

E-Print Network (OSTI)

Interest in road pricing among political leaders, transportation analysts, academics, and government agencies has increased in recent years. There are myriad reasons for this newfound consideration, but the deployment of ...

Ensor, Jeffrey D. (Jeffrey Douglas)

2005-01-01T23:59:59.000Z

463

Insulators for cold urban areas: The problem of Road Salt Ravi Gorur and Sreeram Venkataraman  

E-Print Network (OSTI)

that is being funded through an industry-utility-university consortium PSERC, Power Sytems Engineering Research are more concerned with the effect that the road salts have on insulators, both ceramic and composite

464

An analysis of the current investment trend in the U.S. toll road sector  

E-Print Network (OSTI)

In recent years, long term concessions through public-private partnerships (PPP's) in the US toll road sector have emerged and are expected to become a phenomenon in the near future. Up until now, only two large scale ...

Zhang, Xin, S.M. Massachusetts Institute of Technology

2008-01-01T23:59:59.000Z

465

Promoters and Investors In Antebellum America: The Spread of Plank Road Fever  

E-Print Network (OSTI)

Treatise @lank Roads (New Albany: 29.Richard (Cambridge:of John Taylor of Albany, New York. copy in the manuscriptroads from Albany and Monroe counties in New Yorkto see if

Klein, Daniel; Majewski, John

1991-01-01T23:59:59.000Z

466

Market and Community in Antebellum America: The Plank Roads of New York  

E-Print Network (OSTI)

the State of New York, for 1855 (Albany: C. Van Benthuysen,mileage of New was Per-capita city--Albany .roads analysiscounties (Albany), Monroe (Rochester), ranked low New high

Majewski, John; Baer, Christopher; Klein, Daniel B.

1991-01-01T23:59:59.000Z

467

On-Road Development of the C-Gas Plus Engine in Heavy-Duty Vehicles  

Science Conference Proceedings (OSTI)

Fact sheet details on-road development of C-Gas Plus natural gas engine in Viking Freight heavy-duty trucks, including emissions, fuel costs, and petroleum displacement.

Not Available

2003-06-01T23:59:59.000Z

468

454 Sequencing: The road to the Future ( 7th Annual SFAF Meeting, 2012)  

Science Conference Proceedings (OSTI)

Jim Knight on "454 Sequencing: The Road to the Future" at the 2012 Sequencing, Finishing, Analysis in the Future Meeting held June 5-7, 2012 in Santa Fe, New Mexico.

Knight, James R [Roche

2012-06-01T23:59:59.000Z

469

EA-1184: Transfer of the DP Road Tract to the County of Los Alamos, New Mexico  

Energy.gov (U.S. Department of Energy (DOE))

This EA evaluates the environmental impacts for the proposal to transfer ownership of the undeveloped DP Road Property from the U.S. Department of Energy to Los Alamos County, New Mexico.

470

Plans for Crash-Tested Bridge Railings for Longitudinal Wood Decks on Low-Volume Roads  

E-Print Network (OSTI)

The plans for crashworthy bridge railings for low-volume roads were developed through a cooperative research program involving the USDA Forest Service, Forest Products Laboratory (FPL); the Midwest Roadside Safety Facility, University of Nebraska-Lincoln

United States; Forest Service; Michael A. Ritter; Ronald K. Faller; Steve Bunnell; Paula D. Hilbrich Lee; Barry T. Rosson Abstract

1998-01-01T23:59:59.000Z

471

Gobble Up Fuel Savings on Your Next Road Trip with My Trip Calculator...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

is My Trip Calculator? It is an interactive tool that helps you plan a route, pick a car and estimate a fuel costs for your next road trip. Enter your own miles per gallon...

472

Finding Multiple Lanes in Urban Road Networks with Vision and Lidar  

E-Print Network (OSTI)

This paper describes a system for detecting and estimating the properties of multiple travel lanes in an urban road network from calibrated video imagery and laser range data acquired by a moving vehicle. The system operates ...

Huang, Albert S.

473

U.S. Virgin Islands Energy Road Map: Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Virgin Islands Energy Road Map: Analysis Virgin Islands Energy Road Map: Analysis U.S. Virgin Islands Energy Road Map: Analysis This report lays out the strategy envisioned by the stakeholders in the U.S. Virgin Islands, U.S. Department of Energy, and U.S. Department of Interior to achieve the ambitious goal of achieving a 60% reduction in business-as-usual fossil fuel demand by 2025 (60x25) within the electricity sector. Instead, this work and supporting analysis provides a framework within which decisions can begin to be made, a concrete vision of what the future might hold, and a guide to determine what questions should follow. 52360.pdf More Documents & Publications USVI Energy Road Map: Charting the Course to a Clean Energy Future (Brochure), EDIN (Energy Development in Island Nations), U.S. Virgin

474

Handbook of Emission Factors for Road Transport (HBEFA) | Open Energy  

Open Energy Info (EERE)

of Emission Factors for Road Transport (HBEFA) of Emission Factors for Road Transport (HBEFA) Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Handbook of Emission Factors for Road Transport (HBEFA) Focus Area: Clean Transportation Topics: Policy, Deployment, & Program Impact Website: www.hbefa.net/e/index.html Equivalent URI: cleanenergysolutions.org/content/handbook-emission-factors-road-transp Language: "English,French,German" is not in the list of possible values (Abkhazian, Achinese, Acoli, Adangme, Adyghe; Adygei, Afar, Afrihili, Afrikaans, Afro-Asiatic languages, Ainu, Akan, Akkadian, Albanian, Aleut, Algonquian languages, Altaic languages, Amharic, Angika, Apache languages, Arabic, Aragonese, Arapaho, Arawak, Armenian, Aromanian; Arumanian; Macedo-Romanian, Artificial languages, Assamese, Asturian; Bable; Leonese; Asturleonese, Athapascan languages, Australian languages, Austronesian languages, Avaric, Avestan, Awadhi, Aymara, Azerbaijani, Balinese, Baltic languages, Baluchi, Bambara, Bamileke languages, Banda languages, Bantu (Other), Basa, Bashkir, Basque, Batak languages, Beja; Bedawiyet, Belarusian, Bemba, Bengali, Berber languages, Bhojpuri, Bihari languages, Bikol, Bini; Edo, Bislama, Blin; Bilin, Blissymbols; Blissymbolics; Bliss, Bosnian, Braj, Breton, Buginese, Bulgarian, Buriat, Burmese, Caddo, Catalan; Valencian, Caucasian languages, Cebuano, Celtic languages, Central American Indian languages, Central Khmer, Chagatai, Chamic languages, Chamorro, Chechen, Cherokee, Cheyenne, Chibcha, Chichewa; Chewa; Nyanja, Chinese, Chinook jargon, Chipewyan; Dene Suline, Choctaw, Chuukese, Chuvash, Classical Newari; Old Newari; Classical Nepal Bhasa, Classical Syriac, Coptic, Cornish, Corsican, Cree, Creek, Creoles and pidgins , Crimean Tatar; Crimean Turkish, Croatian, Cushitic languages, Czech, Dakota, Danish, Dargwa, Delaware, Dinka, Divehi; Dhivehi; Maldivian, Dogri, Dogrib, Dravidian languages, Duala, Dutch; Flemish, Dyula, Dzongkha, Eastern Frisian, Efik, Egyptian (Ancient), Ekajuk, Elamite, English, Erzya, Esperanto, Estonian, Ewe, Ewondo, Fang, Fanti, Faroese, Fijian, Filipino; Pilipino, Finnish, Finno-Ugrian languages, Fon, French, Friulian, Fulah, Ga, Gaelic; Scottish Gaelic, Galibi Carib, Galician, Ganda, Gayo, Gbaya, Geez, Georgian, German, Germanic languages, Gilbertese, Gondi, Gorontalo, Gothic, Grebo, Greek, Modern, Guarani, Gujarati, Gwich'in, Haida, Haitian; Haitian Creole, Hausa, Hawaiian, Hebrew, Herero, Hiligaynon, Himachali languages; Western Pahari languages, Hindi, Hiri Motu, Hittite, Hmong; Mong, Hungarian, Hupa, Iban, Icelandic, Ido, Igbo, Ijo languages, Iloko, Inari Sami, Indic languages, Indo-European languages, Indonesian, Ingush, Interlingue; Occidental, Inuktitut, Inupiaq, Iranian languages, Irish, Iroquoian languages, Italian, Japanese, Javanese, Judeo-Arabic, Judeo-Persian, Kabardian, Kabyle, Kachin; Jingpho, Kalaallisut; Greenlandic, Kalmyk; Oirat, Kamba, Kannada, Kanuri, Kara-Kalpak, Karachay-Balkar, Karelian, Karen languages, Kashmiri, Kashubian, Kawi, Kazakh, Khasi, Khoisan languages, Khotanese; Sakan, Kikuyu; Gikuyu, Kimbundu, Kinyarwanda, Kirghiz; Kyrgyz, Klingon; tlhIngan-Hol, Komi, Kongo, Konkani, Korean, Kosraean, Kpelle, Kru languages, Kuanyama; Kwanyama, Kumyk, Kurdish, Kurukh, Kutenai, Ladino, Lahnda, Lamba, Land Dayak languages, Lao, Latin, Latvian, Lezghian, Limburgan; Limburger; Limburgish, Lingala, Lithuanian, Lojban, Lower Sorbian, Lozi, Luba-Katanga, Luba-Lulua, Luiseno, Lule Sami, Lunda, Luo (Kenya and Tanzania), Lushai, Luxembourgish; Letzeburgesch, Macedonian, Madurese, Magahi, Maithili, Makasar, Malagasy, Malay, Malayalam, Maltese, Manchu, Mandar, Mandingo, Manipuri, Manobo languages, Manx, Maori, Mapudungun; Mapuche, Marathi, Mari, Marshallese, Marwari, Masai, Mayan languages, Mende, Mi'kmaq; Micmac, Minangkabau, Mirandese, Mohawk, Moksha, Mon-Khmer languages, Mongo, Mongolian, Mossi, Multiple languages, Munda languages, N'Ko, Nahuatl languages, Nauru, Navajo; Navaho, Ndebele, North; North Ndebele, Ndebele, South; South Ndebele, Ndonga, Neapolitan, Nepal Bhasa; Newari, Nepali, Nias, Niger-Kordofanian languages, Nilo-Saharan languages, Niuean, North American Indian languages, Northern Frisian, Northern Sami, Norwegian, Nubian languages, Nyamwezi, Nyankole, Nyoro, Nzima, Occitan (post 1500); Provençal, Ojibwa, Oriya, Oromo, Osage, Ossetian; Ossetic, Otomian languages, Pahlavi, Palauan, Pali, Pampanga; Kapampangan, Pangasinan, Panjabi; Punjabi, Papiamento, Papuan languages, Pedi; Sepedi; Northern Sotho, Persian, Philippine languages, Phoenician, Pohnpeian, Polish, Portuguese, Prakrit languages, Pushto; Pashto, Quechua, Rajasthani, Rapanui, Rarotongan; Cook Islands Maori, Romance languages, Romanian; Moldavian; Moldovan, Romansh, Romany, Rundi, Russian, Salishan languages, Samaritan Aramaic, Sami languages, Samoan, Sandawe, Sango, Sanskrit, Santali, Sardinian, Sasak, Scots, Selkup, Semitic languages, Serbian, Serer, Shan, Shona, Sichuan Yi; Nuosu, Sicilian, Sidamo, Sign Languages, Siksika, Sindhi, Sinhala; Sinhalese, Sino-Tibetan languages, Siouan languages, Skolt Sami, Slave (Athapascan), Slavic languages, Slovak, Slovenian, Sogdian, Somali, Songhai languages, Soninke, Sorbian languages, Sotho, Southern, South American Indian (Other), Southern Altai, Southern Sami, Spanish; Castilian, Sranan Tongo, Sukuma, Sumerian, Sundanese, Susu, Swahili, Swati, Swedish, Swiss German; Alemannic; Alsatian, Syriac, Tagalog, Tahitian, Tai languages, Tajik, Tamashek, Tamil, Tatar, Telugu, Tereno, Tetum, Thai, Tibetan, Tigre, Tigrinya, Timne, Tiv, Tlingit, Tok Pisin, Tokelau, Tonga (Nyasa), Tonga (Tonga Islands), Tsimshian, Tsonga, Tswana, Tumbuka, Tupi languages, Turkish, Turkmen, Tuvalu, Tuvinian, Twi, Udmurt, Ugaritic, Uighur; Uyghur, Ukrainian, Umbundu, Uncoded languages, Undetermined, Upper Sorbian, Urdu, Uzbek, Vai, Venda, Vietnamese, Volapük, Votic, Wakashan languages, Walamo, Walloon, Waray, Washo, Welsh, Western Frisian, Wolof, Xhosa, Yakut, Yao, Yapese, Yiddish, Yoruba, Yupik languages, Zande languages, Zapotec, Zaza; Dimili; Dimli; Kirdki; Kirmanjki; Zazaki, Zenaga, Zhuang; Chuang, Zulu, Zuni) for this property.

475

On-Road Use of Fischer-Tropsch Diesel Blends  

DOE Green Energy (OSTI)

Alternative compression ignition engine fuels are of interest both to reduce emissions and to reduce U.S. petroleum fuel demand. A Malaysian Fischer-Tropsch gas-to-liquid fuel was compared with California No.2 diesel by characterizing emissions from over the road Class 8 tractors with Caterpillar 3176 engines, using a chassis dynamometer and full scale dilution tunnel. The 5-Mile route was employed as the test schedule, with a test weight of 42,000 lb. Levels of oxides of nitrogen (NO{sub x}) were reduced by an average of 12% and particulate matter (PM) by 25% for the Fischer-Tropsch fuel over the California diesel fuel. Another distillate fuel produced catalytically from Fischer-Tropsch products originally derived from natural gas by Mossgas was also compared with 49-state No.2 diesel by characterizing emissions from Detroit Diesel 6V-92 powered transit buses, three of them equipped with catalytic converters and rebuilt engines, and three without. The CBD cycle was employed as the test schedule, with a test weight of 33,050 lb. For those buses with catalytic converters and rebuilt engines, NO x was reduced by 8% and PM was reduced by 31% on average, while for those buses without, NO x was reduced by 5% and PM was reduced by 20% on average. It is concluded that advanced compression ignition fuels from non-petroleum sources can offer environmental advantages in typical line haul and city transit applications.

Nigel Clark; Mridul Gautam; Donald Lyons; Chris Atkinson; Wenwei Xie; Paul Norton; Keith Vertin; Stephen Goguen; James Eberhardt

1999-04-26T23:59:59.000Z

476

Year/PAD District Alkylates Aromatics Road Oil  

U.S. Energy Information Administration (EIA) Indexed Site

Alkylates Alkylates Aromatics Road Oil and Lubricants Petroleum Coke (MMcfd) Hydrogen Sulfur (short tons/day) Production Capacity Asphalt Isomers Marketable Table 7. Operable Production Capacity of Petroleum Refineries, January 1, 1981 to January 1, 2013 (Thousand Barrels per Stream Day, Except Where Noted) a JAN 1, 1981 974 299 765 131 234 276 2,054 NA JAN 1, 1982 984 290 740 162 242 267 1,944 NA JAN 1, 1983 960 237 722 212 241 296 2,298 NA JAN 1, 1984 945 218 800 208 241 407 2,444 NA JAN 1, 1985 917 215 767 219 243 424 2,572 NA JAN 1, 1986 941 276 804 258 246 356 2,357 NA JAN 1, 1987 974 287 788 326 250 364 2,569 23,806 JAN 1, 1988 993 289 788 465 232 368 2,418 27,639 JAN 1, 1989 1,015 290 823 469 230 333 2,501 28,369 JAN 1, 1990 1,030 290 844 456 232 341 2,607 24,202

477

SLAC Lightsource User Access Guidelines and Agreement  

NLE Websites -- All DOE Office Websites (Extended Search)

Lightsource User Access Guidelines & Agreement Lightsource User Access Guidelines & Agreement August 3, 2011 SLAC-I-030-306-001-00-R002 1 SLAC Lightsource User Access Guidelines and Agreement LCLS / SSRL User Research Administration approval (signature/date): LCLS Safety Office approval (signature/date): SSRL Safety Office approval (signature/date): XFO Operations approval (signature/date): Revision Record Revision Date Revised Section(s) Affected Description of Change R001 October 4 th , 2010 User Form Updated SLAC Lightsource User Access Agreement Form R000 Sept 14, 2009 Original Release SLAC Lightsource User Access Guidelines & Agreement August 3, 2011 SLAC-I-030-306-001-00-R002 1 SLAC LIGHTSOURCE USER ACCESS GUIDELINES & AGREEMENT Introduction Welcome to SSRL and LCLS, SLAC's lightsource user facilities. We hope that your stay here will be

478

Non-Road Industry Advisory Council: September 5 - 6, 2007 Meeting Proceedings  

Science Conference Proceedings (OSTI)

EPRI's Non-Road Transportation Industry Advisory Council brings together industry's stakeholders to promote non-road electrification. The Council's September 5 8212 6, 2007 meeting included stakeholders from utilities, universities, and manufacturers. Twelve presentations dealt with these major categories: air quality, batteries, lift trucks, energy use, utility vehicles, and ground support equipment. During a re-cap of the meeting, participants identified these six items to follow up: 1) address power r...

2007-11-19T23:59:59.000Z

479

Chaotic Vibration of a Quarter-Car Model Excited by the Road Surface Profile  

E-Print Network (OSTI)

The Melnikov criterion is used to examine a global homoclinic bifurcation and transition to chaos in the case of a quarter car model excited kinematically by the road surface profile. By analyzing the potential an analytic expression is found for the homoclinic orbit. By introducing an harmonic excitation term and damping as perturbations, the critical Melnikov amplitude of the road surface profile is found, above which the system can vibrate chaotically.

Grzegorz Litak; Marek Borowiec; Michael I. Friswell; Kazimierz Szabelski

2006-01-14T23:59:59.000Z

480

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-15)  

Science Conference Proceedings (OSTI)

BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission lines. Work also includes clearing of a small (tall-growing vegetation that is currently or will soon be a hazard to the transmission lines and where possible to promote low-growing plant communities in the right-of-way. This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and Record of Decision (ROD). The vegetation needing control is mainly Douglas Fir, Alder, and blackberries as indicated in Section 1.2 of the attached checklist. The work involved in the ROW includes: clearing tall growing vegetation that is currently or will soon pose a hazard to the lines; treating the associated stumps and re-sprouts with herbicide to ensure that the roots are killed preventing new sprouts; and selectively eliminating tall growing vegetation before it reaches a height or density to begin competing with low-growing vegetation. All work will take place in existing rights-of-ways and around transmission structures. All work will be accomplished by selective vegetation control methods to assure that there is little potential harm to non-target vegetation and to low-growing plants. The work will provide system reliability and fire protection. Also, all off right-of-way trees that are potentially unstable and will fall within a minimum distance or into the zone where the conductors swing will be removed. Access roads will be treated using mowing and herbicide applications. The work will provide system reliability. The subject transmission lines range from 115kV to 230kV and are made up of accompanying access roads, steel and wooden transmission line structures and associated switching platforms. The minimum clearance ranges from 21 feet for 115kV lines to 23 feet for 230kV lines. ROW easement widths vary along the length of the project. Vegetation control for this project is designed to provide a 3 year maintenance free interval. In summary, the overall vegetation management scheme will be to selectively remove tall growing vegetation then apply selective herbicide treatment using cut stump applications.

N /A

2001-06-19T23:59:59.000Z

Note: This page contains sample records for the topic "right-of-way access roads" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Site Access Policy | Argonne National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

Laboratory About Work with Argonne Safety News Community Events Careers Directory Energy Environment Security User Facilities Science Technology Visiting Argonne Site Access...

482

Adjudicative Guidelines for Determining Eligibility for Access...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to help a foreign person, group, or country by providing that information; (c) counterintelligence information, that may be classified, indicates that the individual's access to...

483

Expanding Researcher Access to EIA Microdata  

U.S. Energy Information Administration (EIA)

personal computers at remote locations. EIA’s research access program is much more limited than those offered by other statistical agencies.

484

ORISE Resources: Puerto Rico Equal Access Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Minority AIDS Council (NMAC) and Office of AIDS Research (OAR) Puerto Rico Equal Access Program (PREAP). This PREAP training was specifically developed for the Puerto Rican...

485

Presenting Accessibility to Mobility-Impaired Travelers  

E-Print Network (OSTI)

Behaviors of the Mobility-Disabled Consumer." Journal ofCampus Access Guide at the Disabled Student Program at UCto dental services for disabled people. A questionnaire

Nuernberger, Andrea

2008-01-01T23:59:59.000Z

486

Technology and Access to Knowledge - CECM  

E-Print Network (OSTI)

Feb 9, 1998 ... Technology and Access to Knowledge. Mathematics as a branch of human knowledge is several millenia old, and though each individual ...

487

NBP RFI: Data Access | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for approximately 11 percent of all electric energy sold in the United States. NBP RFI: Data Access More Documents & Publications Re: DOE Request for Information - Implementing the...

488

Content-Based Access to Unstructured Information  

Science Conference Proceedings (OSTI)

... of automatic systems that can provide content-based access to information that has not been explicitly structured for machine consumption. ...

2012-01-03T23:59:59.000Z

489

As you prepare for your upcoming beam time, please be aware that construction is planned to update SLAC Gate 17 with RFID proximity card access hardware and to change the stairs next to the Security hut to an ADA compliant ramp. Please forward this to your proposal collaborators (and ensure that all users have registered and completed training before they arrive). This construction is scheduled to begin Tuesday 5/28 and be completed by 6/28. During this construction, access to the LCLS and SSRL buildings and experimental facilities will be provided as follows: VEHICLES ONLY THROUGH GATE 17 5/28-6/28 0600-1530 (6 am-3:30 pm) Construction Zone. Only VEHICLE traffic will be allowed access through Gate 17 and flagman will provide traffic control. 1530-1800 (3:30-6:00 pm) Assumes construction will have stopped for the day; both traffic lanes will be open for vehicles. 1800-0600 (6 pm-6 am) As now, Gate 17 will be closed or barricaded overnight. PEDESTRIANS ONLY THROUGH GATE 16 5/28-6/28 The pedestrian turnstile at Gate 16A will not change. The turnstile is available for pedestrian use 24/7 as long as the individual has a valid SLAC ID badge (and there is a guard at Gate 30 to 'buzz' them through). 0700-1600 (6 am-4 pm) Pedestrians who would normally walk through Gate 17 will instead follow the detour to Gate 16 swing gate which will be unlocked and staffed by Security. A valid SLAC ID badge is needed to enter; new users without IDs will be allowed to proceed for check-in and badging after confirmation with the User Research Administration Office (see detour map attached). FYI - After the construction is completed and proximity card readers are fully functional, users and staff will enter Gates 17 and 30 using an activated RFID proximity card. More details to follow.  

NLE Websites -- All DOE Office Websites (Extended Search)

Automated Proximity Access at Gate 17 and Sector 30 Automated Proximity Access at Gate 17 and Sector 30 New SLAC ID badges with embedded RFID are used to activate these gates and for off-hours access at the main entrance off Sand Hill Road as well as Alpine Road (gates will be accessible 24/7) . New user badges include this proximity gate activation feature, but older photo IDs need to be updated. Users are advised to register, complete training and contact the User Research Administration (URA) office before arrival for beam time to help facilitate access. During the transition period, July 26-August 9, 2013 users can inform Security at Gate 17 that they are checking in and proceed to the URA office in Building 120; however, after August 9 th , users without a proximity activated ID need to stop at

490

Data Center Access Policies and Version 2.0  

E-Print Network (OSTI)

Data Center Access Policies and Procedures Version 2.0 Tuesday, April 6, 2010 University://uits.arizona.edu #12;Table of Contents UITS Data Center Access Policies and Procedures!3 .Introduction!3 Overview!3 Data Center Access!3 Data Center Access - Levels of Access!4 Periodic Review and Termination of Access

Watkins, Joseph C.

491

Archive Access and Accessibility: A Progress Report on Social Networking at Work  

E-Print Network (OSTI)

bubble demo: http://lah.soas.ac.uk/projects/dev/bubble-player/wilbur.html 34 Access is also about perceptions ? perceptions of interfaces – like Facebook, ELAR “reduces distance and power disparities, supports interactions” ? difficult access mistaken...

Nathan, David

2010-12-10T23:59:59.000Z

492

Web Accessibility Office of Diversity and Inclusion  

E-Print Network (OSTI)

Web Accessibility Office of Diversity and Inclusion Applies to: Any website conducting university of the art digital and web based information delivery of information is increasingly central in carrying out constituencies. This policy establishes minimum standards for the accessibility of web based information

Jones, Michelle

493

Three web accessibility evaluation perspectives for RIA  

Science Conference Proceedings (OSTI)

With the increasing popularity of Rich Internet Applications (RIAs), several challenges arise in the area of web accessibility evaluation. A particular set of challenges emerges from RIAs dynamic nature: original static Web specifications can change ... Keywords: automated evaluation, web accessibility, web browser processing, web science

Nádia Fernandes, Ana Sofia Batista, Daniel Costa, Carlos Duarte, Luís Carriço

2013-05-01T23:59:59.000Z

494

Improving Access to Web Content at Google  

E-Print Network (OSTI)

1 Improving Access to Web Content at Google Loretta Guarino Reid (LorettaGuarino@google.com) Srinivas Annam (AnnamS@google.com) March 12, 2008 #12;2 Overview Accessibility developments for : · Gmail · Search · Toolbar · Maps & Transit · Books · Video & Captions · Short Topics ­ Calendar, Google Groups

Cortes, Corinna

495

Distributed user access control in sensor networks  

Science Conference Proceedings (OSTI)

User access control in sensor networks defines a process of granting user the access right to the information and resources. It is essential for the future real sensor network deployment in which sensors may provide users with different services in terms ...

Haodong Wang; Qun Li

2006-06-01T23:59:59.000Z

496

Locally Accessible Information and Distillation of Entanglement  

E-Print Network (OSTI)

A new type of complementary relation is found between locally accessible information and final average entanglement for given ensemble. It is also shown that in some well known distillation protocol, this complementary relation is optimally satisfied. We discuss the interesting trade-off between locally accessible information and distillable entanglement for some states.

Sibasish Ghosh; Pramod Joag; Guruprasad Kar; Samir Kunkri; Anirban Roy

2004-03-18T23:59:59.000Z

497

National Radiobiology Archives Distributed Access user's manual  

SciTech Connect

This User's Manual describes installation and use of the National Radiobiology Archives (NRA) Distributed Access package. The package consists of a distributed subset of information representative of the NRA databases and database access software which provide an introduction to the scope and style of the NRA Information Systems.

Watson, C.; Smith, S. (Pacific Northwest Lab., Richland, WA (United States)); Prather, J. (Linfield Coll., McMinnville, OR (United States))

1991-11-01T23:59:59.000Z

498

Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

tor the addition ot bird tor the addition ot bird diversion equipment along the existing Prescott-Pinnacle Peak 230-kV transmission line right-ot-way located in Yavapai County, Arizona . RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes installing Firefly type bird diversion equipment onto static wires (overhead ground wires) of the Prescott-Pinnacle Peak 230-kV transmission line between structures 144/3 and 145/2. The diverters will be spaced approximately 15 ft apart alternating between the two static lines. The diverters will be installed using a hot stick from a helicopter or by accessing the line using existing access roads and rubber-tired vehicles such as cherry pickers, pickup trucks, crew trucks. All work will be done within Westerns existing right-of-way. This

499

RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

near 10 structure locations along the existing Casa Grande-Empire 115-kV transmission line located in Pinal County, Arizona. RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to do geologic borings within our right-of-way near structures 18/5, 19/6, 21/2, 2317, 26/4, 28/4, 36/1, 37/5, 39/4 and 41/4 along the existing Casa Grande-ED #5115-kV transmission line. This project involves accessing each bore hole location with a augerldrill rig and light crew trucks, setting up the drill rig, drilling, collecting soil samples and breaking down the drilling setup. Existing access roads and vehicles such as pickup trucks & crew trucks will be used to bring personnel and equipment to the work areas. The attached maps show the project areas situated within Sections 7,20 & 32

500

CX-007169: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

169: Categorical Exclusion Determination 169: Categorical Exclusion Determination CX-007169: Categorical Exclusion Determination Saguaro-Oracle Vegetation Removal CX(s) Applied: B1.3 Date: 04/07/2011 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to conduct vegetation removal between structures 0/3 and 0/4, 1/5 and 1/6, 3/1 and 3/2, 4/2 and 4/3, around structure 4/8, between structures 5/1 and 5/2 and around structure 5/4 of its Saguaro-Oracle 115- kilovolt transmission line, within Western's existing right-of-way. Western will access the vegetation removal areas using crew trucks along the existing access roads. Western will use a front end loader with a cut shredder attachment to knock down and chip wood vegetation. The debris will