1

Analysis and Geochemical Modeling of Vanadium Contamination in Groundwater New Rifle Processing Site, Colorado  

Energy.gov (U.S. Department of Energy (DOE))

Analysis and Geochemical Modeling of Vanadium Contamination in Groundwater New Rifle Processing Site, Colorado

2

Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado: Final report  

SciTech Connect

This volume contains Appendix F, bid schedule and specifications for remedial action on three sites: Old Rifle processing site; New Rifle processing site and Estes Gulch disposal site.

Not Available

1992-02-01T23:59:59.000Z

3

DOE - Office of Legacy Management -- Rifle Mill Site - CO 0-11  

Office of Legacy Management (LM)

Rifle Mill Site - CO 0-11 Rifle Mill Site - CO 0-11 FUSRAP Considered Sites Site: Rifle Mill Site (CO.0-11 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Rifle, Colorado, New Processing Site Rifle, Colorado, Old Processing Site Documents Related to Rifle Mill Site 2009 Verification Monitoring Report for the Old and New Rifle, Colorado, Processing Sites; LMS/RFO/RFN/S05775; September 2009. This report evaluates and interprets groundwater monitoring data collected at the Old and New Rifle Sites and assesses the progress of meeting the compliance strategy for groundwater cleanup. 2012 Annual Site Inspection and Monitoring Report for Uranium Mill

4

rifle.cdr  

NLE Websites -- All DOE Office Websites (Extended Search)

sites sites and disposal site near Rifle, Colorado. These sites are managed by the U.S. Department of Energy Office of Legacy Management. Site Description and History Regulatory Setting Processing Sites Two former uranium and vanadium processing sites are located near the city of Rifle, Colorado. The Old Rifle Site is approximately 0.3 mile east of the city of Rifle; the New Rifle Site is approximately 2 miles southwest of Rifle. The Colorado River defines the southern boundary of each site. The ore processing operations created radioactive tailings, a predominantly sandy material. The State of Colorado acquired these sites in 1988 and transferred ownership of both to the City of Rifle; the City acquired the Old Rifle Site in 2000 and the New Rifle Site in 2004. Surface remediation of the Rifle sites began in spring 1992 and was completed in October 1996. Tailings and tailings-contaminated

5

Microbiological, Geochemical and Hydrologic Processes Controlling Uranium Mobility: An Integrated Field-Scale Subsurface Research Challenge Site at Rifle, Colorado, Quality Assurance Project Plan  

SciTech Connect

The U.S. Department of Energy (DOE) is cleaning up and/or monitoring large, dilute plumes contaminated by metals, such as uranium and chromium, whose mobility and solubility change with redox status. Field-scale experiments with acetate as the electron donor have stimulated metal-reducing bacteria to effectively remove uranium [U(VI)] from groundwater at the Uranium Mill Tailings Site in Rifle, Colorado. The Pacific Northwest National Laboratory and a multidisciplinary team of national laboratory and academic collaborators has embarked on a research proposed for the Rifle site, the object of which is to gain a comprehensive and mechanistic understanding of the microbial factors and associated geochemistry controlling uranium mobility so that DOE can confidently remediate uranium plumes as well as support stewardship of uranium-contaminated sites. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Rifle Integrated Field-Scale Subsurface Research Challenge Project.

Fix, N. J.

2008-01-07T23:59:59.000Z

6

rifle.cdr  

Office of Legacy Management (LM)

Two former uranium and vanadium processing sites Two former uranium and vanadium processing sites are located near the city of Rifle, Colorado. The Old Rifle site is approximately 0.3 mile east of the city of Rifle; the New Rifle site is approximately 2 miles southwest of Rifle. The Colorado River defines the southern boundary of each site. The ore-processing operations created radioactive tailings, a predominantly sandy material. The State of Colorado acquired these sites in 1988 and transferred ownership of both to the City of Rifle; the City acquired the Old Rifle site in 2000 and the New Rifle site in 2004. Surface remediation of the Rifle sites began in spring 1992 and was completed in October 1996. Tailings and tailings-contaminated materials from both former processing sites were relocated to the Rifle Disposal

7

EA-1406: Ground Water Compliance at the New Rifle, Colorado, UMTRA Project Site, Rifle, Colorado  

Energy.gov (U.S. Department of Energy (DOE))

This EA evaluates the environmental impacts for the proposed compliance strategy of natural flushing combined with institutional controls and continued monitoring for the New Rifle uranium mill...

8

Mitigation action plan for remedial action at the Uranium Mill Tailing Sites and Disposal Site, Rifle, Colorado  

SciTech Connect

The Estes Gulch disposal site is approximately 10 kilometers (6 miles) north of the town of Rifle, off State Highway 13 on Federal land administered by the Bureau of Land Management. The Department of Energy (DOE) will transport the residual radioactive materials (RRM) by truck to the Estes Gulch disposal site via State Highway 13 and place it in a partially below-grade disposal cell. The RRM will be covered by an earthen radon barrier, frost protection layers, and a rock erosion protection layer. A toe ditch and other features will also be constructed to control erosion at the disposal site. After removal of the RRM and disposal at the Estes Gulch site, the disturbed areas at all three sites will be backfilled with clean soils, contoured to facilitate surface drainage, and revegetated. Wetlands areas destroyed at the former Rifle processing sites will be compensated for by the incorporation of now wetlands into the revegetation plan at the New Rifle site. The UMTRA Project Office, supported by the Remedial Action Contractor (RAC) and the Technical Assistance Contractor (TAC), oversees the implementation of the MAP. The RAC executes mitigation measures in the field. The TAC provides monitoring of the mitigation actions in cases where mitigation measures are associated with design features. Site closeout and inspection compliance will be documented in the site completion report.

Not Available

1992-07-01T23:59:59.000Z

9

rifle.cdr  

Office of Legacy Management (LM)

JUNCTION JUNCTION RIFLE GRAND DISPOSAL SITE N NEW RIFLE 70 DENVER COLORADO MILLSITE 6 65 MILES 20 10 0 133 30 OLD RIFLE MILLSITE RIFLE C O L O R A D O RIVER 13 R I F L E C R E E K GLENWOOD SPRINGS NEW CASTLE M:\LTS\111\0017\01\S0016200.DWG The Grand Junction Office has provided cost-effective and efficient stewardship for more than 10 years F A C T S H E E T Overview Regulatory Setting Rifle Disposal Site Uranium and vanadium ores were processed at two millsites near Rifle, Colorado, between 1924 through 1981. Milling operations created process-related wastes and tailings, a sandlike waste product containing radio- active materials and other contaminants. In 1996, the U.S. Department of Energy (DOE) encapsulated the tailings from the two millsites in an engineered disposal cell at Estes Gulch, north of Rifle. The U.S. Nuclear Regulatory Commission included the

10

DOE - Office of Legacy Management -- Rifle_New  

Office of Legacy Management (LM)

Sites and Disposal Site Fact Sheet December 15, 2011 Data Validation Package November 2013 Groundwater and Surface Water Sampling at the Rifle, Colorado, New and Old Processing...

11

Ground Water Compliance Action Plan for the Old Rifle, Colorado, UMTRA Project Site  

Office of Legacy Management (LM)

GJO-2000-177-TAR GJO-2000-177-TAR MAC-GWRFL 1.9 Ground Water Compliance Action Plan for the Old Rifle, Colorado, UMTRA Project Site December 2001 Work Performed Under DOE Contract No. DE-AC13-96GJ87335 for the U.S. Department of Energy Approved for public release; distribution is unlimited. GJO-2000-177-TAR MAC-GWRFL 1.9 Ground Water Compliance Action Plan for the Old Rifle, Colorado, UMTRA Project Site December 2001 Prepared by U.S. Department of Energy Grand Junction Office Grand Junction, Colorado Project Number UGW-511-0017-12-000 Document Number U0066302 Work Performed under DOE Contract No. DE-AC13-96GJ87335 Document Number U0066302 Contents DOE/Grand Junction Office Ground Water Compliance Action Plan for Old Rifle, Colorado

12

DOE - Office of Legacy Management -- Rifle_D  

Office of Legacy Management (LM)

Disposal Site Disposal Site This Site All Sites All LM Quick Search Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet 2012 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites-Rifle, Colorado, Disposal Site Long-Term Surveillance Plan for the Estes Gulch Disposal Site Near Rifle, Colorado Please be green. Do not print these documents unless absolutely necessary. Request a paper copy of any document by submitting a Document Request. All Site Documents All documents are Adobe Acrobat files. pdf_icon Fact Sheet Annual Inspection Report Long-Term Surveillance Plan Fact Sheet Rifle, Colorado, Processing Sites and Disposal Site Fact Sheet December 15, 2011 Annual Inspection Report

13

EIS-0132: Remedial Actions at the Former Union Carbide Corp. Uranium Mill Sites, Rifle, Garfield County, Colorado  

Energy.gov (U.S. Department of Energy (DOE))

The U.S. Department of Energy developed this statement to evaluate and compare the environmental impacts of remediating the residual radioactive materials left at the inactive uranium tailing sites in Rifle, Colorado.

14

Mineral transformation and biomass accumulation associated with uranium bioremediation at Rifle, Colorado  

E-Print Network (OSTI)

bioremediation at Rifle, Colorado. J. Contam. Hydrol. 2009 (Bioremediation at Rifle, Colorado Li Li a* , Carl I. Steefelcontaminated site near Rifle, Colorado. We use the reactive

Li, L.

2009-01-01T23:59:59.000Z

15

Colorado, Processing Sites  

Office of Legacy Management (LM)

of the New Rifle site were observed and recorded in trip reports. During CY 2013, DOE was in communication with property owners and various users of City-owned property...

16

Public Involvment Plan - Rifle, Colorado  

Office of Legacy Management (LM)

4-TAR 4-TAR MAC-GWRIF 7.1 UMTRA Ground Water Project Public Involvement Plan for the Environmental Assessment of Ground Water Compliance at the New and Old Rifle, Colorado, Uranium Mill Tailings Sites May 1999 Prepared by U.S. Department of Energy Grand Junction Office Grand Junction, Colorado Work performed under DOE Contract No. DE-AC13-96GJ87335 Public Involvement Plan for the Rifle UMTRA Sites Page 2 Introduction This Public Involvement Plan is tiered to the Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project Public Participation Plan dated October 1997. This Public Involvement Plan applies to both the Old and New Rifle, Colorado, UMTRA Project sites and details the activities that have been or will be carried out to meet the public participation requirements of the

17

DOE - Office of Legacy Management -- Rifle_Old  

Office of Legacy Management (LM)

Old Processing Site Old Processing Site This Site All Sites All LM Quick Search Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet 2012 Verification Monitoring Report for the Old and New Rifle, Colorado, Processing Sites Data Validation Package-June 2013 Groundwater and Surface Water Sampling Ground Water Compliance Action Plan for the Old Rifle, Colorado, UMTRA Project Site Please be green. Do not print these documents unless absolutely necessary. Request a paper copy of any document by submitting a Document Request. Status of Pending Decision Documents Groundwater Compliance Action Plan Under review by U.S. Nuclear Regulatory Commission All Site Documents All documents are Adobe Acrobat files. pdf_icon Fact Sheet Data Validation Package

18

Uranium 238U/235U isotope ratios as indicators of reduction: Results from an in situ biostimulation experiment at Rifle, Colorado, USA  

E-Print Network (OSTI)

Experiment at Rifle, Colorado, U.S.A. Charles John Bopp IV*,Site in Rifle, Colorado (USA). An array of monitoring anda U mill at Rifle, Colorado (USA). The experiments at this

Bopp IV, C.J.

2010-01-01T23:59:59.000Z

19

Microsoft Word - New Rifle EA.doc  

Office of Legacy Management (LM)

DOE/EA-1406 DOE/EA-1406 Final Environmental Assessment of Ground Water Compliance at the New Rifle, Colorado, UMTRA Project Site July 2003 Work Performed Under DOE Contract No. DE-AC13-02GJ79491 for the U.S. Department of Energy Approved for public release; distribution is unlimited. U01341 DOE/EA-1406 Rev. 0 Final Environmental Assessment of Ground Water Compliance at the New Rifle, Colorado, UMTRA Project Site July 2003 Prepared by U.S. Department of Energy Grand Junction Office Grand Junction, Colorado Work Performed Under DOE Contract No. DE-AC13-02GJ79491 This Page Intentionally Blank DOE Grand Junction Office EA of Ground Water Compliance at the New Rifle Site July 2003 Page iii Contents

20

RESEARCH ARTICLE OPEN ACCESS CFD Studies on Multi Lead Rifled [MLR] Boiler Tubes  

E-Print Network (OSTI)

This paper reports the merits of multi lead rifled [MLR] tubes in vertical water tube boiler using CFD tool. Heat transfer enhancement of MLR tubes was mainly taken in to consideration. Performance of multi lead rifled tube was studied by varying its influencing geometrical parameter like number of rifling, height of rifling, length of pitch of rifling for a particular length. The heat transfer analysis was done at operating conditions of an actual coal fired water tube boiler situated at Apollo Tyres LTD, Chalakudy, India for saturated process steam production. The results showed that the heat transfer increased when compared with existing inner plane wall water tubes.

Dr T C Mohankumar; Nice Thomachan

Note: This page contains sample records for the topic "rifle processing site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Radiological survey of the inactive uranium-mill tailings at Rifle, Colorado  

SciTech Connect

Results of radiological surveys of two inactive uranium-mill sites near Rifle, Colorado, in May 1976 are presented. These sites are referred to as Old Rifle and New Rifle. The calculated /sup 226/Ra inventory of the latter site is much higher than at the older mill location. Data on above-ground measurements of gamma exposure rates, surface and near-surface concentration of /sup 226/Ra in soil and sediment samples, concentration of /sup 226/Ra in water, calculated subsurface distribution of /sup 226/Ra, and particulate radionuclide concentrations in air samples are given. The data serve to define the extent of contamination in the vicinity of the mill sites and their immediate surrounding areas with tailings particles. Results of these measurements were utilized as technical input for an engineering assessment of these two sites.

Haywood, F.F.; Jacobs, D.J.; Ellis, B.S.; Hubbard, H.M. Jr.; Shinpaugh, W.H.

1980-06-01T23:59:59.000Z

22

Rifle, Colorado: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Rifle, Colorado: Energy Resources Rifle, Colorado: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 39.5347023°, -107.7831198° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.5347023,"lon":-107.7831198,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

23

Recommendation 198: Establish a site transition process  

Energy.gov (U.S. Department of Energy (DOE))

The ORSSAB recommends DOE Establish a Site Transition Process Upon Completion of Remediation at Ongoing Mission Sites.

24

Small Site Closures  

Office of Environmental Management (EM)

CO 1997 Old Rifle, CO 1997 Slick Rock Old North Continent, CO 1997 Slick Rock Union Carbide, CO 1997 New Brunswick Site, NJ 1997 List of Small Site Closures by Year 2 Site Name,...

25

Composition, stability, and measurement of reduced uranium phases for groundwater bioremediation at Old Rifle, CO  

SciTech Connect

Reductive biostimulation is currently being explored as a possible remediation strategy for uranium (U) contaminated groundwater, and is currently being investigated at a field site in Rifle, CO, USA. The long-term stability of the resulting U(IV) phases is a key component of the overall performance and depends upon a variety of factors, including rate and mechanism of reduction, mineral associations in the subsurface, and propensity for oxidation. To address these factors, several approaches were used to evaluate the redox sensitivity of U: measurement of the rate of oxidative dissolution of biogenic uraninite (UO2(s)) deployed in groundwater at Rifle, characterization of a zone of natural bioreduction exhibiting relevant reduced mineral phases, and laboratory studies of the oxidative capacity of Fe(III) and reductive capacity of Fe(II) with regard to U(IV) and U(VI), respectively.

Campbell, Kate M.; Davis, J. A.; Bargar, John R.; Giammar, Daniel E.; Bernier-Latmani, Rizlan; Kukkadapu, Ravi K.; Williams, K. H.; Veramani, H.; Ulrich, Kai-Uwe; Stubbs, J. B.; Yabusaki, Steven B.; Figueroa, Linda A.; Lesher, Emily; Wilkins, Michael J.; Peacock, Aaron D.; Longg, P. E.

2011-03-26T23:59:59.000Z

26

Mineral transformation and biomass accumulation associated with uranium bioremediation at Rifle, Colorado  

SciTech Connect

Injection of organic carbon into the subsurface as an electron donor for bioremediation of redox-sensitive contaminants like uranium often leads to mineral transformation and biomass accumulation, both of which can alter the flow field and potentially bioremediation efficacy. This work combines reactive transport modeling with a column experiment and field measurements to understand the biogeochemical processes and to quantify the biomass and mineral transformation/accumulation during a bioremediation experiment at a uranium contaminated site near Rifle, Colorado. We use the reactive transport model CrunchFlow to explicitly simulate microbial community dynamics of iron and sulfate reducers, and their impacts on reaction rates. The column experiment shows clear evidence of mineral precipitation, primarily in the form of calcite and iron monosulfide. At the field scale, reactive transport simulations suggest that the biogeochemical reactions occur mostly close to the injection wells where acetate concentrations are highest, with mineral precipitate and biomass accumulation reaching as high as 1.5% of the pore space. This work shows that reactive transport modeling coupled with field data can be an effective tool for quantitative estimation of mineral transformation and biomass accumulation, thus improving the design of bioremediation strategies.

Li, L.; Steefel, C.I.; Williams, K.H.; Wilkins, M.J.; Hubbard, S.S.

2009-04-20T23:59:59.000Z

27

RIFLE GAP RESERVOIR FISHERY INVESTIGATION Photo: Willow Hibbs  

E-Print Network (OSTI)

in western Colorado, hosts a popular recreational fishery. Historically, stocked rainbow and brown trout have Department of Fish, Wildlife and Conservation Biology, Colorado State University Tel: 970-491-5002 email, Wildlife and Conservation Biology, Colorado State University March 2009 #12;Rifle Gap Reservoir Fishery

28

Site Transition Process upon Completion of the Cleanup Mission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for sites that will transfer to a Landlord Program Secretarial Office or to Legacy Management for long-term stewardship. Site Transition Process upon Completion of the...

29

Microsoft Word - 10063154.doc  

Office of Legacy Management (LM)

Old and New Rifle, Old and New Rifle, Colorado, Processing Sites October 2010 LMS/RFL/S00610 This page intentionally left blank U.S. Department of Energy DVP-June 2010, Rifle, Colorado October 2010 RIN 10063154 Page i Contents Sampling Event Summary ...............................................................................................................1 Rifle Old Sample Location Map ......................................................................................................5 Rifle Nerw Sample Location Map ...................................................................................................6 Data Assessment Summary..............................................................................................................7

30

Transuranic Waste Processing Center Oak Ridge Site Specific...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transuranic Waste Processing Update Oak Ridge Site Specific Advisory Board May 14, 2014 Laura Wilkerson, Portfolio Federal Project Director Karen Deacon, Deputy Federal Project...

31

EIS-0082-S2: Savannah River Site Salt Processing, Savannah River Site,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

082-S2: Savannah River Site Salt Processing, Savannah River 082-S2: Savannah River Site Salt Processing, Savannah River Site, Aiken, South Carolina EIS-0082-S2: Savannah River Site Salt Processing, Savannah River Site, Aiken, South Carolina SUMMARY This SEIS evaluates the potential environmental impacts of alternatives for separating the high-activity fraction from the low-activity fraction of the high-level radioactive waste salt solutions now stored in underground tanks at the Savannah River Site (SRS) near Aiken, South Carolina. The high-activity fraction of the high-level waste (HLW) salt solution would then be vitrified in the Defense Waste Processing Facility (DWPF) and stored until it could be disposed of as HLW in a geologic repository. The low activity fraction would be disposed of as low-level waste (saltstone)

32

Independent Oversight Review, Savannah River Site Salt Waste Processing  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Salt Waste Savannah River Site Salt Waste Processing Facility - August 2013 Independent Oversight Review, Savannah River Site Salt Waste Processing Facility - August 2013 August 2013 Review of the Savannah River Site Salt Waste Processing Facility Safety Basis and Design Development. This report documents the results of an independent oversight review of the safety basis and design development for the Salt Waste Processing Facility (SWPF) at the U.S. Department of Energy (DOE) Savannah River Site. The review was performed February 12-14, 2013 by DOE's Office of Safety and Emergency Management Evaluations, which is within the DOE Office of Health, Safety and Security. The purpose of the review was to evaluate the safety basis, design, and the associated technical documents developed for

33

Independent Oversight Review, Savannah River Site Salt Waste Processing  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Salt Waste Savannah River Site Salt Waste Processing Facility - August 2013 Independent Oversight Review, Savannah River Site Salt Waste Processing Facility - August 2013 August 2013 Review of the Savannah River Site Salt Waste Processing Facility Safety Basis and Design Development. This report documents the results of an independent oversight review of the safety basis and design development for the Salt Waste Processing Facility (SWPF) at the U.S. Department of Energy (DOE) Savannah River Site. The review was performed February 12-14, 2013 by DOE's Office of Safety and Emergency Management Evaluations, which is within the DOE Office of Health, Safety and Security. The purpose of the review was to evaluate the safety basis, design, and the associated technical documents developed for

34

Correct implementation of the Argonne QuickSite{sup SM} process for preremedial site investigations  

SciTech Connect

Expedited site characterization (ESC), developed by Argonne National Laboratory, is an interactive, integrated process emphasizing the use of existing data of sufficient quality, multiple complementary characterization methods, and on-site decision making to optimize environmental site investigations. The Argonne ESC is the basis for the provisional ESC standard guide of the ASTM (American Society for Testing and Materials). QuickSite{sup SM} is the implementation package developed by Argonne to facilitate ESC of sites contaminated with hazardous wastes. At various sites, Argonne has successfully implemented QuickSite{sup SM} and demonstrated the technical superiority of the ESC process over traditional methodologies guided by statistics and random-sampling approaches. A key feature in the success of QuickSite{sup SM} investigations is achieving an understanding of the subsurface geologic and hydrogeologic controls and processes at a site before extensive sampling efforts begin. The QuickSite{sup SM} investigation at the Tustin Marine Corps Air Station (MCAS) in California will be used to illustrate the importance of understanding these potential controls in minimizing sampling activities and correctly predicting potential contaminant migration patterns for risk assessment.

Burton, J.C.; Walker, J.L. [Argonne National Lab., IL (United States). Environmental Research Div.

1997-10-01T23:59:59.000Z

35

Site Formation Processes at the Buttermilk Creek Site (41BL1239), Bell County, Texas  

E-Print Network (OSTI)

August 2009 Major Subject: Anthropology iii ABSTRACT Site Formation Processes at the Buttermilk Creek Site (41BL1239), Bell County, Texas. (August 2009) Joshua Lake Keene, B.A., Eastern Washington University Chair of Advisory Committee: Dr... ................................................................................................................... 94 APPENDIX B ................................................................................................................. 105 APPENDIX C...

Keene, Joshua L.

2010-10-12T23:59:59.000Z

36

Savannah River Site Marks Waste Processing Milestone with Melter's  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Marks Waste Processing Milestone with Savannah River Site Marks Waste Processing Milestone with Melter's 2,000th Waste Canister Savannah River Site Marks Waste Processing Milestone with Melter's 2,000th Waste Canister February 1, 2012 - 12:00pm Addthis A Savannah River Remediation employee uses a manipulator located inside a shielded enclosure at the Defense Waste Processing Facility, where a melter pours molten glass into a canister. A Savannah River Remediation employee uses a manipulator located inside a shielded enclosure at the Defense Waste Processing Facility, where a melter pours molten glass into a canister. AIKEN, S.C. - The second melter to operate in the 16-year history of the nation's largest radioactive waste glassification plant shows no signs of slowing after recently pouring its 2,000 canister of glass-formed hazardous

37

Microsoft Word - 12054589 DVP  

Office of Legacy Management (LM)

Old and New Rifle, Old and New Rifle, Colorado, Processing Sites October 2012 LMS/RFN/RFO/S00612 This page intentionally left blank U.S. Department of Energy DVP-June 2012, Rifle, Colorado October 2012 RIN 12054589 Page i Contents Sampling Event Summary ...............................................................................................................1 Sample Location Map for the New Rifle, Colorado, Processing Site .............................................5

38

Microsoft Word - RIN 11114182 DVP  

Office of Legacy Management (LM)

Old and New Rifle, Old and New Rifle, Colorado, Processing Sites February 2012 LMS/RFO/RFN/S01111 This page intentionally left blank U.S. Department of Energy DVP-November 2011, Rifle, Colorado February 2012 RIN 11114182 Page i Contents Sampling Event Summary ...............................................................................................................1 Rifle New, Colorado, Processing Site Sample Location Map .........................................................5 Rifle Old, Colorado, Processing Site Sample Location Map ..........................................................6 Data Assessment Summary ..............................................................................................................7 Water Sampling Field Activities Verification Checklist .............................................................9

39

September 2004 Water Sampling  

Office of Legacy Management (LM)

Old and New Rifle, Old and New Rifle, Colorado, Processing Sites August 2013 LMS/RFN/RFO/S00613 This page intentionally left blank U.S. Department of Energy DVP-June 2013, Rifle, Colorado August 2013 RIN 13065380 Page i Contents Sampling Event Summary ...............................................................................................................1 Sample Location Map, New Rifle, Colorado, Processing Site ........................................................5 Sample Location Map, Old Rifle, Colorado, Processing Site ..........................................................6 Data Assessment Summary ..............................................................................................................7 Water Sampling Field Activities Verification Checklist .............................................................9

40

Savannah River Site Marks Waste Processing Milestone with Melter's  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Marks Waste Processing Milestone with Marks Waste Processing Milestone with Melter's 2,000th Waste Canister Savannah River Site Marks Waste Processing Milestone with Melter's 2,000th Waste Canister February 1, 2012 - 12:00pm Addthis A Savannah River Remediation employee uses a manipulator located inside a shielded enclosure at the Defense Waste Processing Facility, where a melter pours molten glass into a canister. A Savannah River Remediation employee uses a manipulator located inside a shielded enclosure at the Defense Waste Processing Facility, where a melter pours molten glass into a canister. AIKEN, S.C. - The second melter to operate in the 16-year history of the nation's largest radioactive waste glassification plant shows no signs of slowing after recently pouring its 2,000 canister of glass-formed hazardous

Note: This page contains sample records for the topic "rifle processing site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Uranium Bioreduction Rates across Scales: Biogeochemical Hot Moments and Hot Spots during a Biostimulation Experiment at Rifle, Colorado  

SciTech Connect

We aim to understand the scale-dependent evolution of uranium bioreduction during a field experiment at a former uranium mill site near Rifle, Colorado. Acetate was injected to stimulate Fe-reducing bacteria (FeRB) and to immobilize aqueous U(VI) to insoluble U(IV). Bicarbonate was coinjected in half of the domain to mobilize sorbed U(VI). We used reactive transport modeling to integrate hydraulic and geochemical data and to quantify rates at the grid block (0.25 m) and experimental field scale (tens of meters). Although local rates varied by orders of magnitude in conjunction with biostimulation fronts propagating downstream, field-scale rates were dominated by those orders of magnitude higher rates at a few selected hot spots where Fe(III), U(VI), and FeRB were at their maxima in the vicinity of the injection wells. At particular locations, the hot moments with maximum rates negatively corresponded to their distance from the injection wells. Although bicarbonate injection enhanced local rates near the injection wells by a maximum of 39.4%, its effect at the field scale was limited to a maximum of 10.0%. We propose a rate-versus-measurement-length relationship (log R' = -0.63

Bao, Chen; Wu, Hongfei; Li, Li; Newcomer, Darrell R.; Long, Philip E.; Williams, Kenneth H.

2014-09-02T23:59:59.000Z

42

THE COLD AND DARK PROCESS AT THE SAVANNAH RIVER SITE  

SciTech Connect

The deactivation and decommissioning (D&D) of a facility exposes D&D workers to numerous hazards. One of the more serious hazards is coming into contact to hazardous energy sources (e.g. electrical, pressurized steam). At the Savannah River Site (SRS) a formal process for identifying and eliminating sources of hazardous energy was developed and is called ''Cold & Dark''. Several ''near miss'' events involving cutting of energized conductors during D&D work in buildings thought to be isolated identified the need to have a formal process to identify and isolate these potentially hazardous systems. This process was developed using lessons learned from D&D activities at the Rocky Flats Environmental Technology Site (Rocky Flats) in Colorado. The Cold & Dark process defines an isolation boundary (usually a building perimeter) and then systematically identifies all of the penetrations through this boundary. All penetrations that involve hazardous energy sources are then physically air-gapped. The final product is a documented declaration of isolation performed by a team involving operations, engineering, and project management. Once the Cold & Dark declaration is made for a building work can proceed without the usual controls used in an operational facility (e.g. lockout/tagout, arc flash PPE). It is important to note that the Cold & Dark process does not remove all hazards from a facility. Work planning and controls still need to address hazards that can be present from such things as chemicals, radiological contamination, residual liquids, etc., as well as standard industrial hazards.

Gilmour, J; William Austin, W; Cathy Sizemore, C

2007-01-31T23:59:59.000Z

43

Independent Oversight Review, Savannah River Site Salt Waste Processing Facility- August 2013  

Energy.gov (U.S. Department of Energy (DOE))

Review of the Savannah River Site Salt Waste Processing Facility Safety Basis and Design Development.

44

Independent Oversight Review, Savannah River Site Salt Waste Processing Facility- April 2014  

Energy.gov (U.S. Department of Energy (DOE))

Review of the Savannah River Site Salt Waste Processing Facility Construction Quality and Fire Protection Systems

45

Actinide solution processing at the Rocky Flats Environmental Technology Site  

SciTech Connect

The Department of Energy (DOE) has prepared an Environmental Assessment (EA), DOE/EA-1039, for radioactive solution removal and processing at Rocky Flats Environmental Technology Site, Golden, Colorado. The proposal for solution removal and processing is in response to independent safety assessments and an agreement with the State of Colorado to remove mixed residues at Rocky Flats and reduce the risk of future accidents. Monthly public meetings were held during the scoping and preparation of the EA. The scope of the EA included evaluations of alternative methods and locations of solution processing. A comment period from February 20, 1995 through March 21, 1995 was provided to the public and the State of Colorado to offer written comment on the EA. Comments were received from the State of Colorado and the U.S. Environmental Protection Agency. A response to the agency comments is included in the Final EA.

NONE

1995-04-01T23:59:59.000Z

46

The Cold and Dark Process at the Savannah River Site  

SciTech Connect

The deactivation and decommissioning (D and D) of a facility exposes D and D workers to numerous hazards. One of the more serious hazards is coming into contact to hazardous energy sources (e.g. electrical, pressurized steam). At the Savannah River Site (SRS) a formal process for identifying and eliminating sources of hazardous energy was developed and is called 'Cold and Dark'. Several 'near miss' events involving cutting of energized conductors during D and D work in buildings thought to be isolated identified the need to have a formal process to identify and isolate these potentially hazardous systems. This process was developed using lessons learned from D and D activities at the Rocky Flats Environmental Technology Site (Rocky Flats) in Colorado. The Cold and Dark process defines an isolation boundary (usually a building perimeter) and then systematically identifies all of the penetrations through this boundary. All penetrations that involve hazardous energy sources are then physically air-gapped. The final product is a documented declaration of isolation performed by a team involving operations, engineering, and project management. Once the Cold and Dark declaration is made for a building work can proceed without the usual controls used in an operational facility (e.g. lockout/tag-out, arc flash PPE). It is important to note that the Cold and Dark process does not remove all hazards from a facility. Work planning and controls still need to address hazards that can be present from such things as chemicals, radiological contamination, residual liquids, etc., as well as standard industrial hazards. Savannah River Site experienced 6 electrical events prior to declaring a facility 'cold and dark' and has had zero electrical events after 'cold and dark' declaration (263 facilities to date). The formal Cold and Dark process developed at SRS has eliminated D and D worker exposures to hazardous energy sources. Since the implementation of the process there have been no incidents involving energized conductors or pressurized liquids/gases. During this time SRS has demolished over 200 facilities. The ability to perform intrusive D and D activities without the normal controls such as lock outs results in shorter schedule durations and lower overall costs for a facility D and D.

Gilmour, John C. [CH2SRC, Savannah River Site, Aiken, SC 29808 (United States); Willis, Michael L. [Washington Savannah River Company, Aiken, SC 29808 (United States)

2008-01-15T23:59:59.000Z

47

EIS-0112: Rifle to San Juan 345-kV Transmission Line and Associated Facilities  

Energy.gov (U.S. Department of Energy (DOE))

The U.S. Department of Agriculture - Rural Electrification Administration developed this statement to evaluate the environmental impacts of the Colorado-Ute Electric Association Inc. and the U.s. Department of Energy's Western Area Power Administration (WAPA) constructing and operating a 345-kilovolt transmission line from Rifle, Colorado, to the San Juan Generating Station near Farmington, New Mexico. WAPA served as a cooperating agency in the preparation of this statement and adopted it on 10/30/1984. WAPA assumed the lead role for project implementation after issuance of the final statement.

48

A complete remediation process for a uranium-contaminated site and application to other sites  

SciTech Connect

During the summer of 1996 the authors were able to test, at the pilot scale, the concept of leaching uranium (U) from contaminated soils. The results of this pilot scale operation showed that the system they previously had developed at the laboratory scale is applicable at the pilot scale. The paper discusses these results, together with laboratory scale results using soil from the Fernald Environmental Management Project (FEMP), Ohio. These FEMP results show how, with suitable adaptations, the process is widely applicable to other sites. The purpose of this paper is to describe results that demonstrate remediation of uranium-contaminated soils may be accomplished through a leach scheme using sodium bicarbonate.

Mason, C.F.V.; Lu, N.; Kitten, H.D.; Williams, M.; Turney, W.R.J.R.

1998-12-31T23:59:59.000Z

49

File:08COaBulkTransmissionSitingProcess.pdf | Open Energy Information  

Open Energy Info (EERE)

COaBulkTransmissionSitingProcess.pdf Jump to: navigation, search File File history File usage Metadata File:08COaBulkTransmissionSitingProcess.pdf Size of this preview: 463 599...

50

Experimental investigation on heat transfer and frictional characteristics of vertical upward rifled tube in supercritical CFB boiler  

Science Journals Connector (OSTI)

Water wall design is a key issue for supercritical Circulating Fluidized Bed (CFB) boiler. On account of the good heat transfer performance, rifled tube is applied in the water wall design of a 600MW supercritical CFB boiler in China. In order to investigate the heat transfer and frictional characteristics of the rifled tube with vertical upward flow, an in-depth experiment was conducted in the range of pressure from 12 to 30MPa, mass flux from 230 to 1200kg/(m2s), and inner wall heat flux from 130 to 720kW/m2. The wall temperature distribution and pressure drop in the rifled tube were obtained in the experiment. The normal, enhanced and deteriorated heat transfer characteristics were also captured. In this paper, the effects of pressure, inner wall heat flux and mass flux on heat transfer characteristics are analyzed, the heat transfer mechanism and the frictional resistance performance are discussed, and the corresponding empirical correlations are presented. The experimental results show that the rifled tube can effectively prevent the occurrence of Departure from Nucleate Boiling (DNB) and keep the tube wall temperature in a permissible range under the operating condition of supercritical CFB boiler.

Dong Yang; Jie Pan; Chenn Q. Zhou; Xiaojing Zhu; Qincheng Bi; Tingkuan Chen

2011-01-01T23:59:59.000Z

51

GRR/Section 7-HI-b - Renewable Energy Facility Siting Process | Open Energy  

Open Energy Info (EERE)

7-HI-b - Renewable Energy Facility Siting Process 7-HI-b - Renewable Energy Facility Siting Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 7-HI-b - Renewable Energy Facility Siting Process 07HIBRenewableEnergyFacilitySitingProcessREFSP.pdf Click to View Fullscreen Contact Agencies Hawaii Department of Business, Economic Development, and Tourism Regulations & Policies Hawaii Revised Statutes 201N Hawaii Administrative Rules Title 15, Chapter 36 Triggers None specified Click "Edit With Form" above to add content 07HIBRenewableEnergyFacilitySitingProcessREFSP.pdf 07HIBRenewableEnergyFacilitySitingProcessREFSP.pdf 07HIBRenewableEnergyFacilitySitingProcessREFSP.pdf Error creating thumbnail: Page number not in range.

52

A Fully Automated Fault-tolerant System for Distributed Video Processing and Off-site Replication  

E-Print Network (OSTI)

A Fully Automated Fault-tolerant System for Distributed Video Processing and Off-site Replication been a failure-prone tedious operation with an operator needed to babysit the processing and off-site, off-site replication, fault-tolerance, grid, educational research. 1. INTRODUCTION In different fields

Wisconsin at Madison, University of

53

Site Transition Process upon Completion of the Cleanup Mission: Fact Sheet  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Process upon Completion of the Cleanup Mission: Process upon Completion of the Cleanup Mission: Fact Sheet (September 2013) Site Transition Process upon Completion of the Cleanup Mission: Fact Sheet (September 2013) DOE's internal site transition process for Cleanup to long-term stewardship, post-cleanup, and post-closure has been established in transition guidance for sites that will transfer to a Landlord Program Secretarial Office or to Legacy Management for long-term stewardship. Site Transition Process upon Completion of the Cleanup Mission: Fact Sheet (September 2013) More Documents & Publications Site Transition Summary: Cleanup Completion to Long-Term Stewardship at Department of Energy On-going Mission Sites Site Transition Process Upon Cleanup Completion EM SSAB Conference Calls - January 27, 2011

54

Site Transition Process Upon Cleanup Completion. Fact Sheet  

SciTech Connect

After environmental remediation is completed at a site and there is no continuing mission, responsibility for the site and the associated records are transferred to the U.S. Department of Energy (DOE) Office of Legacy Management for post-closure management. Where residual hazards (e.g., disposal cells, ground water contamination) remain, active long-term surveillance and maintenance will be required to ensure protection of human health and the environment.

none,

2009-05-19T23:59:59.000Z

55

THE RELATIONSHIP BETWEEN THE RADIATION SURVEY AND SITE INVESTIGATION PROCESS, THE CERCLA REMEDIAL OR REMOVAL  

E-Print Network (OSTI)

Assessment Site Inspection Remedial Investigation Feasibility Study Remedial Design/ Remedial Action PassAPPENDIX F THE RELATIONSHIP BETWEEN THE RADIATION SURVEY AND SITE INVESTIGATION PROCESS, THE CERCLA REMEDIAL OR REMOVAL PROCESS, AND THE RCRA CORRECTIVE ACTION PROCESS This appendix presents a discussion

56

Idaho Site Taps Old World Process to Treat Nuclear Waste | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Idaho Site Taps Old World Process to Treat Nuclear Waste Idaho Site Taps Old World Process to Treat Nuclear Waste Idaho Site Taps Old World Process to Treat Nuclear Waste September 9, 2013 - 12:00pm Addthis The Idaho site's sodium distillation system. The Idaho site's sodium distillation system. The top of a sodium distillation vessel, where waste enters the system. The top of a sodium distillation vessel, where waste enters the system. The Idaho site's sodium distillation system. The top of a sodium distillation vessel, where waste enters the system. IDAHO FALLS, Idaho - The EM program at the Idaho site is using an age-old process to treat transuranic (TRU) waste left over from nuclear reactor experiments. Developed in the first century and perfected by moonshiners in the 19th century, distillation will be used at the Idaho Nuclear Technology and

57

HAB Advice and Issue Tracking Process for Draft RCRA Site-Wide...  

NLE Websites -- All DOE Office Websites (Extended Search)

Advice and Issue Tracking Process for Draft RCRA Site-Wide Permit Comment Period Last updated 5812 Introduction: The following document is a living document intended to be...

58

NASA Cold Land Processes Experiment (CLPX 2002/03): Local Scale Observation Site  

Science Journals Connector (OSTI)

The local scale observation site (LSOS) is the smallest study site (0.8 ha) of the 2002/03 Cold Land Processes Experiment (CLPX) and is located within the Fraser mesocell study area. It was the most intensively measured site of the CLPX, and ...

Janet Hardy; Robert Davis; Yeohoon Koh; Don Cline; Kelly Elder; Richard Armstrong; Hans-Peter Marshall; Thomas Painter; Gilles Castres Saint-Martin; Roger DeRoo; Kamal Sarabandi; Tobias Graf; Toshio Koike; Kyle McDonald

2008-12-01T23:59:59.000Z

59

LIFE CYCLE ASSET MANAGEMENT Good Practice Guide GPG-FM-024 Site-Selection Process  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LIFE LIFE CYCLE ASSET MANAGEMENT Good Practice Guide GPG-FM-024 Site-Selection Process March 1996 Department of Energy Office of Field Management Office of Project and Fixed Asset Management This page intentionally left blank. Contents GPG-FM-024 March 1996 iii 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1.1 Purpose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1.2 Site Selection, NEPA, and Comprehensive Land-Use Planning . . . . . . . . . . . . . . 2 2. PRINCIPLES AND PROCESSES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 2.1 Formal (Program Directed or Competed) Site Selection . . . . . . . . . . . . . . . . . . . 5 2.1.1 The Site-Selection Official . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 2.1.2 Site-Selection Team . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 2.1.3 Determining Task Scope

60

Microsoft Word - 09032201_DVP.doc  

Office of Legacy Management (LM)

Old and New Rifle, Old and New Rifle, Colorado, Processing Sites June 2009 LMS/RFN/RFO/S00409 This page intentionally left blank U.S. Department of Energy DVP-April 2009, Old and New Rifle, Colorado June 2009 RIN 09032201 Page i Contents Sampling Event Summary ...............................................................................................................1 Old and New Rifle, Colorado, Processing Sites Sample Location Map..........................................5 Data Assessment Summary..............................................................................................................7 Water Sampling Field Activities Verification Checklist .............................................................9 Laboratory Performance Assessment.........................................................................................11

Note: This page contains sample records for the topic "rifle processing site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Process Description for the Retrieval of Earth Covered Transuranic (TRU) Waste Containers at the Hanford Site  

SciTech Connect

This document describes process and operational options for retrieval of the contact-handled suspect transuranic waste drums currently stored below grade in earth-covered trenches at the Hanford Site. Retrieval processes and options discussed include excavation, container retrieval, venting, non-destructive assay, criticality avoidance, incidental waste handling, site preparation, equipment, and shipping.

DEROSA, D.C.

2000-01-13T23:59:59.000Z

62

Savannah River Site - Salt Waste Processing Facility Independent Technical Review  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SALT WASTE PROCESSING FACILITY SALT WASTE PROCESSING FACILITY INDEPENDENT TECHNICAL REVIEW November 22, 2006 Conducted by: Harry Harmon, Team Lead Civil/Structural Sub Team Facility Safety Sub Team Engineering Sub Team Peter Lowry, Lead James Langsted, Lead George Krauter, Lead Robert Kennedy Chuck Negin Art Etchells Les Youd Jerry Evatt Oliver Block Loring Wyllie Richard Stark Tim Adams Tom Anderson Todd LaPointe Stephen Gosselin Carl Costantino Norman Moreau Patrick Corcoran John Christian Ken Cooper Kari McDaniel _____________________________ Harry D. Harmon ITR Team Leader SPD-SWPF-217 SPD-SWPF-217: Salt Waste Processing Facility Independent Technical Review 11/22/2006 ACKNOWLEDGEMENT The ITR Team wishes to thank Shari Clifford of Pacific Northwest National Laboratory for

63

GRR/Section 7-WA-a - Energy Facility Siting Process | Open Energy  

Open Energy Info (EERE)

form form View source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit with form History Facebook icon Twitter icon » GRR/Section 7-WA-a - Energy Facility Siting Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 7-WA-a - Energy Facility Siting Process 7-WA-a - Energy Facility Siting Process (1).pdf Click to View Fullscreen Contact Agencies Washington State Energy Facility Site Evaluation Council Regulations & Policies RCW 80.50.60(1) WAC 463-60 RCW 80.50.090(2) WAC 463-30-270 WAC 463-30-320 Triggers None specified Under RCW 80.50.60(1) a developer may not begin construction of a new energy facility site until they obtain Energy Facility Siting certification

64

T-720: Blue Coat Director HTTP Trace Processing Flaw Permits Cross-Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Blue Coat Director HTTP Trace Processing Flaw Permits 0: Blue Coat Director HTTP Trace Processing Flaw Permits Cross-Site Scripting Attacks T-720: Blue Coat Director HTTP Trace Processing Flaw Permits Cross-Site Scripting Attacks September 19, 2011 - 8:45am Addthis PROBLEM Blue Coat Director HTTP Trace Processing Flaw Permits Cross-Site Scripting Attacks. PLATFORM: All versions of Director prior to 5.5.2.3 are vulnerable. ABSTRACT: A vulnerability was reported in Blue Coat Director. A remote user can conduct cross-site scripting attacks. reference LINKS: Blue Coat Advisories ID: SA62 SecurityTracker Alert ID: 1026061 Blue Coat Director 510 Blue Coat SGME 5 IMPACT ASSESSMENT: Medium Discussion: An attacker can use the HTTP TRACE method to echo malicious script back to the client as part of a Cross Site Scripting (XSS) attack. No

65

GRR/Section 10 - On-Site Evaluation Process | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 10 - On-Site Evaluation Process GRR/Section 10 - On-Site Evaluation Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 10 - On-Site Evaluation Process 10SiteEvaluation.pdf Click to View Fullscreen Contact Agencies Bureau of Land Management U S Army Corps of Engineers United States Environmental Protection Agency Fish and Wildlife Service United States Department of Defense Regulations & Policies Endangered Species Act Clean Water Act Clean Air Act Triggers None specified Click "Edit With Form" above to add content 10SiteEvaluation.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative

66

Review of the Nevada National Security Site Implementation Verification Review Processes, March 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the Nevada National Security Site the Nevada National Security Site Implementation Verification Review Processes March 2012 Office of Safety and Emergency Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................... 1 2.0 Background ............................................................................................................................................. 1 3.0 Scope ....................................................................................................................................................... 1

67

Review of the Savannah River Site Tritium Facilities Implementation Verification Review Processes  

NLE Websites -- All DOE Office Websites (Extended Search)

Savannah River Site Tritium Facilities Savannah River Site Tritium Facilities Implementation Verification Review Processes June 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................. 1 2.0 Background ........................................................................................................................................... 1 3.0 Scope..................................................................................................................................................... 1

68

Review of the Savannah River Site Tritium Facilities Implementation Verification Review Processes  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Tritium Facilities Savannah River Site Tritium Facilities Implementation Verification Review Processes June 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................. 1 2.0 Background ........................................................................................................................................... 1 3.0 Scope..................................................................................................................................................... 1

69

File:07-CA-e - BLM-CEC Joint Siting Process.pdf | Open Energy...  

Open Energy Info (EERE)

Community Login | Sign Up Search File Edit History Facebook icon Twitter icon File:07-CA-e - BLM-CEC Joint Siting Process.pdf Jump to: navigation, search File File history File...

70

Ground water remediation at the Moab, Utah, USA, former uranium-ore processing site  

Science Journals Connector (OSTI)

Seepage from the Moab, Utah, USA, former uranium-ore processing site resulted in ammonia and uranium contamination of naturally occurring saline ground water in alluvium adjacent to the Colorado River. An interim...

Donald R. Metzler; Joseph D. Ritchey; Kent A. Bostick

2008-01-01T23:59:59.000Z

71

Environmental assessment of remedial action at the Naturita uranium processing site near Naturita, Colorado: Revision 5  

SciTech Connect

Title 1 of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law (PL) 95-604, authorized the US Department of Energy (DOE) to perform remedial action at the inactive Naturita, Colorado, uranium processing site to reduce the potential health effects from the radioactive materials at the site and at vicinity properties associated with the site. Title 2 of the UMTRCA authorized the US Nuclear Regulatory Commission (NRC) or agreement state to regulate the operation and eventual reclamation of active uranium processing sites. The uranium mill tailings at the site were removed and reprocessed from 1977 to 1979. The contaminated areas include the former tailings area, the mill yard, the former ore storage area, and adjacent areas that were contaminated by uranium processing activities and wind and water erosion. The Naturita remedial action would result in the loss of 133 acres (ac) of contaminated soils at the processing site. If supplemental standards are approved by the NRC and the state of Colorado, approximately 112 ac of steeply sloped contaminated soils adjacent to the processing site would not be cleaned up. Cleanup of this contamination would have adverse environmental consequences and would be potentially hazardous to remedial action workers.

Not Available

1994-10-01T23:59:59.000Z

72

Site specific mutagenesis study of the protein folding process of luciferase  

E-Print Network (OSTI)

SITE SPECIFIC MUTAGENESIS STUDY OF THE PROTEIN FOLDING PROCESS OF LUCIFERASE A Thesis KE WEI Submitted to the Office of Graduate Studies of Texas A8 M University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE... MAY 1990 Major Subject: Genetics SITE SPECIFIC MUTAGENESIS STUDY OF THE PROTEIN FOLDING PROCESS OF LUCIFERASE A Thesis by KE WEI Approved as to style and content by: T. O. aldwin ( Chair of Committee ) C. N. Pace ( Member ) M. D. Manson...

Wei, Ke

2012-06-07T23:59:59.000Z

73

Final Report - Independent Verification Survey Activities at the Seperations Process Research Unit Sites, Niskayuna, New York  

SciTech Connect

The Separations Process Research Unit (SPRU) complex located on the Knolls Atomic Power Laboratory (KAPL) site in Niskayuna, New York, was constructed in the late 1940s to research the chemical separation of plutonium and uranium (Figure A-1). SPRU operated as a laboratory scale research facility between February 1950 and October 1953. The research activities ceased following the successful development of the reduction oxidation and plutonium/uranium extraction processes. The oxidation and extraction processes were subsequently developed for large scale use by the Hanford and Savannah River sites (aRc 2008a). Decommissioning of the SPRU facilities began in October 1953 and continued through the 1990s.

Evan Harpenau

2011-03-15T23:59:59.000Z

74

File:07HIBRenewableEnergyFacilitySitingProcessREFSP.pdf | Open Energy  

Open Energy Info (EERE)

HIBRenewableEnergyFacilitySitingProcessREFSP.pdf HIBRenewableEnergyFacilitySitingProcessREFSP.pdf Jump to: navigation, search File File history File usage File:07HIBRenewableEnergyFacilitySitingProcessREFSP.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 3 Go! next page → next page → Full resolution ‎(1,275 × 1,650 pixels, file size: 124 KB, MIME type: application/pdf, 3 pages) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 16:39, 27 December 2012 Thumbnail for version as of 16:39, 27 December 2012 1,275 × 1,650, 3 pages (124 KB) Alevine (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information)

75

GRR/Section 8-MT-a - Transmission Siting Process | Open Energy Information  

Open Energy Info (EERE)

8-MT-a - Transmission Siting Process 8-MT-a - Transmission Siting Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 8-MT-a - Transmission Siting Process 08MTATransmission (3).pdf Click to View Fullscreen Contact Agencies Montana Department of Environmental Quality Regulations & Policies Montana Code Annotated Title 75, Chapter 20 Montana Environmental Policy Act MCA 75-20-301 Findings Necessary for Certification ARM 17.20.1606 Electric Transmission Lines, Need Standard ARM 17.20.907 ARM 17.20.920 ARM 17.20.921 ARM 17.20.923 ARM 17.20.1902 Triggers None specified Click "Edit With Form" above to add content 08MTATransmission (3).pdf 08MTATransmission (3).pdf Error creating thumbnail: Page number not in range.

76

Multi-discipline Waste Acceptance Process at the Nevada National Security Site - 13573  

SciTech Connect

The Nevada National Security Site low-level radioactive waste disposal facility acceptance process requires multiple disciplines to ensure the protection of workers, the public, and the environment. These disciplines, which include waste acceptance, nuclear criticality, safety, permitting, operations, and performance assessment, combine into the overall waste acceptance process to assess low-level radioactive waste streams for disposal at the Area 5 Radioactive Waste Management Site. Four waste streams recently highlighted the integration of these disciplines: the Oak Ridge Radioisotope Thermoelectric Generators and Consolidated Edison Uranium Solidification Project material, West Valley Melter, and classified waste. (authors)

Carilli, Jhon T. [US Department Of Energy, Nevada Site Office, P. O. Box 98518, Las Vegas, Nevada 89193-8518 (United States)] [US Department Of Energy, Nevada Site Office, P. O. Box 98518, Las Vegas, Nevada 89193-8518 (United States); Krenzien, Susan K. [Navarro-Intera, LLC, P. O. Box 98952, Las Vegas, Nevada 89193-8952 (United States)] [Navarro-Intera, LLC, P. O. Box 98952, Las Vegas, Nevada 89193-8952 (United States)

2013-07-01T23:59:59.000Z

77

Remaining Sites Verification Package for the 100-B-14:1 Process Sewer, Waste Site Reclassification Form 2004-005  

SciTech Connect

The 100-B-14:1 subsite encompasses the former process sewer main associated with the 105-B Reactor Building, 108-B Chemical Pumphouse and Tritium Separation Facility, 184-B Boiler House and the 100-B water treatment facilities, as well as the feeder lines associated with the 108-B facility, formerly discharging to the 116-B-7 Outfall Structure. The subsite has been remediated to achieve the remedial action objectives specified in the Remaining Sites ROD. The results of verification sampling demonstrated that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also showed that residual contaminant concentrations are protective of groundwater and the Columbia River.

L. M. Dittmer

2007-02-22T23:59:59.000Z

78

Overview of Fiscal Year 2002 Research and Development for Savannah River Site's Salt Waste Processing Facility  

SciTech Connect

The Department of Energy's (DOE) Savannah River Site (SRS) high-level waste program is responsible for storage, treatment, and immobilization of high-level waste for disposal. The Salt Processing Program (SPP) is the salt (soluble) waste treatment portion of the SRS high-level waste effort. The overall SPP encompasses the selection, design, construction and operation of treatment technologies to prepare the salt waste feed material for the site's grout facility (Saltstone) and vitrification facility (Defense Waste Processing Facility). Major constituents that must be removed from the salt waste and sent as feed to Defense Waste Processing Facility include actinides, strontium, cesium, and entrained sludge. In fiscal year 2002 (FY02), research and development (R&D) on the actinide and strontium removal and Caustic-Side Solvent Extraction (CSSX) processes transitioned from technology development for baseline process selection to providing input for conceptual design of the Salt Waste Processing Facility. The SPP R&D focused on advancing the technical maturity, risk reduction, engineering development, and design support for DOE's engineering, procurement, and construction (EPC) contractors for the Salt Waste Processing Facility. Thus, R&D in FY02 addressed the areas of actual waste performance, process chemistry, engineering tests of equipment, and chemical and physical properties relevant to safety. All of the testing, studies, and reports were summarized and provided to the DOE to support the Salt Waste Processing Facility, which began conceptual design in September 2002.

H. D. Harmon, R. Leugemors, PNNL; S. Fink, M. Thompson, D. Walker, WSRC; P. Suggs, W. D. Clark, Jr

2003-02-26T23:59:59.000Z

79

Review of Implementation Verification Review Processes at the Idaho Site - Phase 1 of 2, November 2011  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Implementation Verification Review Processes at the Idaho Site - Phase 1 of 2 May 2011 November 2011 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................. 1 2.0 Scope..................................................................................................................................................... 1 3.0 Background ........................................................................................................................................... 2

80

Review of Implementation Verification Review Processes at the Idaho Site - Phase 1 of 2, November 2011  

NLE Websites -- All DOE Office Websites (Extended Search)

Implementation Verification Review Processes at the Idaho Site - Phase 1 of 2 May 2011 November 2011 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................. 1 2.0 Scope..................................................................................................................................................... 1 3.0 Background ........................................................................................................................................... 2

Note: This page contains sample records for the topic "rifle processing site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Population viability, ecological processes and biodiversity: Valuing sites for reserve selection  

E-Print Network (OSTI)

. Representation of biodiversity is necessary in reserve planning, but will ultimately fail for conservation unlessPopulation viability, ecological processes and biodiversity: Valuing sites for reserve selection of Washington, Box 351800, Seattle, WA, 98195-1800, United States b Center for Biodiversity Research, Department

82

Microsoft PowerPoint - GC webpage Site Map.ppt [Compatibility Mode]  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Consolidated Business Center Environmental Management Consolidated Business Center Consolidated Business Center Environmental Management Consolidated Business Center Office of Legal Services Office of Legal Services Client Sites Client Sites (Includes Environmental Management Mission Support and Legacy Management Sites) (Includes Environmental Management Mission Support and Legacy Management Sites) Arkansas SEFOR-Southwest Experimental Fast Oxide Reactor Arizona Tuba City- Tuba City Disposal Site California OAKLAND - Oakland Projects Office SLAC - Stanford Linear Accelerator Center ETEC - Energy Technology Engineering Center ETEC - Energy Technology Engineering Center GEVNC- GE Vallecitos Nuclear Center LBNL- Lawrence Berkley National Laboratory Colorado ROCKY FLATS - Rocky Flats LM- Grand Junction Office, Slick Rock Site, Rifle Sites and Rulison Site

83

Summary - Salt Waste Processing Facility Design at the Savannah River Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Salt Waste Processing Facility Salt Waste Processing Facility ETR Report Date: November 2006 ETR-4 United States Department of Energy Office of Environmental Management (DOE-EM) External Technical Review of the Salt Waste Processing Facility Design at the Savannah River Site (SRS) Why DOE-EM Did This Review The Salt Waste Processing Facility (SWPF) is intended to remove and concentrate the radioactive strontium (Sr), actinides, and cesium (Cs) from the bulk salt waste solutions in the SRS high-level waste tanks. The sludge and strip effluent from the SWPF that contain concentrated Sr, actinide, and Cs wastes will be sent to the SRS Defense Waste Processing Facility (DWPF), where they will be vitrified. The decontaminated salt solution (DSS) that is left after removal of the highly

84

SITE  

Office of Legacy Management (LM)

-@-Y? ALTERNATE -@-Y? ALTERNATE NfiME: --___---------------___________________N~ME:---------------------- CITY- - .---------------^---------- STATE: wz ------ OWNER(S) -------- Past: Current: ------------------------ _~~--___~~-----_~~----~~-- Owner contacted [3 yes 0 no; if yes, date contacted ------------- TYPE OF ' OPERATION ____-------~----- q Research & Development !zl Facility Type 0 Production scale testing 0 Manufactuiinq 0 Pilot Scale [7 University 0 Bench Scale Process 0 Research Organization 0 Theoretical Studies 0 Government Sponsored Faci 1 i ty 0 Sample & Analysis Cl Other ---_-~~----_~~---~-~ 0 Production 0 Disposal/Storage TYPE OF CONTRACT -_---------~~~~~ q Prime q Subcontract& 0 Purchase Order 0 Other information (i.e., c&t

85

Review of Safety Basis Development for the Savannah River Site Salt Waste Processing Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of5 of5 U.S. Department of Energy Subject: Review of Safety Basis Development for the Savannah River Site Salt Waste Processing Facility - Inspection Criteria, Approach, and Line:~ HS: Rev: Eff. Date: HSS CRAD 45-57 0 January 31,2013 Office of Safety and Emergency Management Evaluations Acting Direc or, Office of Sifety and Emergency Management Evaluations Date: January 31, 2013 Criteria Review and Approach Document LL.v. ~·M Criteria Lead:ife\riew of Safety Basis Development for the Savannah River Site Salt Waste Processing Facility Page 1 of 5 Date: January 31, 2013 1.0 PURPOSE Within the Office of Health, Safety and Security (HSS), the Office of Enforcement and Oversight, Office of Safety and Emergency Management Evaluations (HS-45) mission is to assess the effectiveness of the

86

Multi-attribute evaluation and selection of sites for agricultural product warehouses based on an Analytic Hierarchy Process  

Science Journals Connector (OSTI)

Site selection for companies is a complex and unstructured problem that must be analyzed carefully and properly, since a localization error could drive to bankrupt. This problem has been discussed widely and effectively using multi-attribute methods ... Keywords: Analytic Hierarchy Process, Multi-criteria and Multi-attribute methods in agribusiness, Site selection attributes, Site selection problem

J. L. Garca; A. Alvarado; J. Blanco; E. Jimnez; A. A. Maldonado; G. Corts

2014-01-01T23:59:59.000Z

87

File:08ORAStateTransmissionSitingProcess (1).pdf | Open Energy Information  

Open Energy Info (EERE)

ORAStateTransmissionSitingProcess (1).pdf ORAStateTransmissionSitingProcess (1).pdf Jump to: navigation, search File File history File usage File:08ORAStateTransmissionSitingProcess (1).pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 79 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 17:08, 5 October 2012 Thumbnail for version as of 17:08, 5 October 2012 1,275 × 1,650 (79 KB) Dfitzger (Talk | contribs) 13:13, 28 September 2012 Thumbnail for version as of 13:13, 28 September 2012 1,275 × 1,650 (57 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup

88

File:08UTAStateTransmissionSitingProcess.pdf | Open Energy Information  

Open Energy Info (EERE)

UTAStateTransmissionSitingProcess.pdf UTAStateTransmissionSitingProcess.pdf Jump to: navigation, search File File history File usage File:08UTAStateTransmissionSitingProcess.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 44 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 15:27, 14 January 2013 Thumbnail for version as of 15:27, 14 January 2013 1,275 × 1,650 (44 KB) Alevine (Talk | contribs) 16:01, 8 January 2013 Thumbnail for version as of 16:01, 8 January 2013 1,275 × 1,650 (39 KB) Alevine (Talk | contribs) 12:17, 30 August 2012 Thumbnail for version as of 12:17, 30 August 2012 1,275 × 1,650 (49 KB) Jnorris (Talk | contribs)

89

MEASUREMENT AND PREDICTION OF RADIOLYTIC HYDROGEN PRODUCTION IN DEFENSE WASTE PROCESSING SLURRIES AT SAVANNAH RIVER SITE  

SciTech Connect

This paper presents results of measurements and predictions of radiolytic hydrogen production rates from two actual process slurries in the Defense Waste Processing Facility (DWPF) at Savannah River Site (SRS). Hydrogen is a flammable gas and its production in nuclear facilities can be a safety hazard if not mitigated. Measurements were made in the Shielded Cells of Savannah River National Laboratory (SRNL) using a sample of Sludge Batch 3 (SB3) currently being processed by the DWPF. Predictions were made using published values for rates of radiolytic reactions producing H{sub 2} in aqueous solutions and the measured radionuclide and chemical compositions of the two slurries. The agreement between measured and predicted results for nine experiments ranged from complete agreement to 24% difference. This agreement indicates that if the composition of the slurry being processed is known, the rate of radiolytic hydrogen production can be reasonably estimated.

Bibler, N; John Pareizs, J; Terri Fellinger, T; Cj Bannochie, C

2007-01-10T23:59:59.000Z

90

Review of the Savannah River Site, Salt Waste Processing Facility, Construction Quality of Piping and Pipe Supports, September 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

Savannah River Site, Salt Waste Processing Savannah River Site, Salt Waste Processing Facility, Construction Quality of Piping & Pipe Supports September 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose................................................................................................................................................. 1 2.0 Scope.................................................................................................................................................... 1 3.0 Background .......................................................................................................................................... 1

91

Review of the Savannah River Site, Salt Waste Processing Facility, Construction Quality of Piping and Pipe Supports, September 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site, Salt Waste Processing Savannah River Site, Salt Waste Processing Facility, Construction Quality of Piping & Pipe Supports September 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose................................................................................................................................................. 1 2.0 Scope.................................................................................................................................................... 1 3.0 Background .......................................................................................................................................... 1

92

Estimating HAPs and radionuclide emissions from a laboratory complex at a nuclear processing site  

SciTech Connect

A unique methodology was developed for conducting an air emission inventory (AEI) at a DOE nuclear processing facility. This methodology involved the use of computer-assisted design (CAD) drawings to document emission points, computerized process drawings to document industrial processes leading to emissions, and a computerized data base of AEI forms to document emission estimates and related process data. A detailed air emissions inventory for operating years 1985--1991 was recently implemented for the entire site using this methodology. One industrial area at the DOE Site is comprised of laboratory facilities that provide direct support to the nuclear reactor and recovery operations, developmental studies to support reactor and separation operations, and developmental studies to support waste handling and storage. The majority of the functions are conducted in a single large building complex wherein bench scale and pilot scale experiments are carried out involving radionuclides, hazardous air pollutants (HAP), and other chemicals reportable under the Clean Air Act Amendments (CAAA) and Superfund Amendments and Re-authorization Act (SARA) Title 111. The results of the inventory showed that HAP and radionuclide emissions from the laboratory complex were relatively minor.

Paul, R.A. [IT Corp., Durham, NC (United States); Faugl, T. [Westinghouse Savannah River Co., Aiken, SC (United States)

1993-10-01T23:59:59.000Z

93

A case study of optimization in the decision process: Siting groundwater monitoring wells  

SciTech Connect

Optimization is one of the tools available to assist decision makers in balancing multiple objectives and concerns. In a case study of the siting decision for groundwater monitoring wells, we look at the influence of the optimization models on the decisions made by the responsible groundwater specialist. This paper presents a multi-objective integer programming model for determining the location of monitoring wells associated with a groundwater pump-and-treat remediation. After presenting the initial optimization results, we analyze the actual decision and revise the model to incorporate elements of the problem that were later identified as important in the decision-making process. The results of a revised model are compared to the actual siting plans, the recommendations from the initial optimization runs, and the initial monitoring network proposed by the decision maker.

Cardwell, H.; Huff, D.; Douthitt, J.; Sale, M.

1993-12-01T23:59:59.000Z

94

Process centrifuge operating problems and equipment failures in canyon reprocessing facilities at the Savannah River Site  

SciTech Connect

The Savannah River Laboratory (SRL) maintains a compilation of operating problems and equipment failures that have occurred in the fuel reprocessing areas of the Savannah River Site (SRS). At present, the data bank contains more than 230,000 entries ranging from minor equipment malfunctions to incidents with the potential for injury or contamination of personnel, or for economic loss. The data bank has been used extensively for a wide variety of purposes, such as failure analyses, trend analyses, and preparation of safety analyses. Typical of the data are problems associated with the canyon process centrifuges. This report contains a compilation of the centrifuge operating problems and equipment failures primarily as an aid to organizations with related equipment. Publication of these data was prompted by a number of requests for this information by other Department of Energy (DOE) sites. 11 refs., 2 figs., 4 tabs.

Durant, W.S.; Baughman, D.F.

1990-03-01T23:59:59.000Z

95

Microsoft Word - 09112697 DVP.doc  

Office of Legacy Management (LM)

and Surface Water and Surface Water Sampling at the Rifle (Old), Colorado, Processing Site January 2010 LMS/RFO/S01109 This page intentionally left blank U.S. Department of Energy DVP-November 2009, Rifle, Colorado January 2010 RIN 09112697 Page i Contents Sampling Event Summary ...............................................................................................................1 Old and New Rifle, Colorado, Processing Sites Sample Location Map..........................................3 Data Assessment Summary..............................................................................................................5 Water Sampling Field Activities Verification Checklist .............................................................7

96

Evaluation of System Level Modeling and Simulation Tools in Support of Savannah River Site Liquid Waste Process  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Liquid Waste Process Savannah River Site Liquid Waste Process June 2009 Monica C. Regalbuto Office of Waste Processing DOE/EM Kevin G. Brown Vanderbilt University and CRESP David W. DePaoli Oak Ridge National Laboratory Candido Pereira Argonne National Laboratory John R. Shultz Office of Waste Processing DOE/EM Sahid C. Smith Office of Waste Processing DOE/EM External Technical Review for Evaluation of System Level Modeling and Simulation Tools in Support of Savannah River Site Liquid Waste Process June 2009 ACKNOWLEDGEMENTS The Review Team thanks Ms. Sonitza Blanco, Team Lead Planning and Coordination Waste Disposition Project U.S. Department of Energy Savannah River Operations Office and Mr. Pete Hill, Liquid Waste Planning Manager for Washington Savannah River Company, for their

97

Social Decision-making Processes in Local Contexts: An STS Case Study on Nuclear Power Plant Siting in Japan  

Science Journals Connector (OSTI)

This is an STS case study of the social decision-making process on the siting of a nuclear power plant in Japan, from the point of view of a ... and the phase involving introduction into society. Nuclear power te...

Kohta Juraku; Tatsujiro Suzuki; Osamu Sakura

2007-12-01T23:59:59.000Z

98

Review of the Implementation Verification Rev iew Processes at the Savannah River Site Environmental Management Nuclear Facilities, September 2011  

NLE Websites -- All DOE Office Websites (Extended Search)

Implementation Verification Review Implementation Verification Review Processes at the Savannah River Site Environmental Management Nuclear Facilities May 2011 September 2011 Office of Safety and Emergency Management Evaluations Office of Health, Safety and Security U.S. Department of Energy i Independent Oversight Review of the Implementation Verification Review Processes at the Savannah River Site Environmental Management Nuclear Facilities Table of Contents 1.0 Purpose ................................................................................................................................................. 1 2.0 Background ........................................................................................................................................... 1

99

Review of the Implementation Verification Rev iew Processes at the Savannah River Site Environmental Management Nuclear Facilities, September 2011  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Implementation Verification Review Implementation Verification Review Processes at the Savannah River Site Environmental Management Nuclear Facilities May 2011 September 2011 Office of Safety and Emergency Management Evaluations Office of Health, Safety and Security U.S. Department of Energy i Independent Oversight Review of the Implementation Verification Review Processes at the Savannah River Site Environmental Management Nuclear Facilities Table of Contents 1.0 Purpose ................................................................................................................................................. 1 2.0 Background ........................................................................................................................................... 1

100

INSTALLATION OF BUBBLERS IN THE SAVANNAH RIVER SITED DEFENSE WASTE PROCESSING FACILITY MELTER  

SciTech Connect

Savannah River Remediation (SRR) LLC assumed the liquid waste contract at the Savannah River Site (SRS) in the summer of 2009. The main contractual agreement was to close 22 High Level Waste (HLW) tanks in eight years. To achieve this aggressive commitment, faster waste processing throughout the SRS liquid waste facilities will be required. Part of the approach to achieve faster waste processing is to increase the canister production rate of the Defense Waste Processing Facility (DWPF) from approximately 200 canisters filled with radioactive waste glass per year to 400 canisters per year. To reach this rate for melter throughput, four bubblers were installed in the DWPF Melter in the late summer of 2010. This effort required collaboration between SRR, SRR critical subcontractor EnergySolutions, and Savannah River Nuclear Solutions, including the Savannah River National Laboratory (SRNL). The tasks included design and fabrication of the bubblers and related equipment, testing of the bubblers for various technical issues, the actual installation of the bubblers and related equipment, and the initial successful operation of the bubblers in the DWPF Melter.

Smith, M.; Iverson, D.

2010-12-08T23:59:59.000Z

Note: This page contains sample records for the topic "rifle processing site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Critical Protection Item classification for a waste processing facility at Savannah River Site  

SciTech Connect

This paper describes the methodology for Critical Protection Item (CPI) classification and its application to the Structures, Systems and Components (SSC) of a waste processing facility at the Savannah River Site (SRS). The WSRC methodology for CPI classification includes the evaluation of the radiological and non-radiological consequences resulting from postulated accidents at the waste processing facility and comparison of these consequences with allowable limits. The types of accidents considered include explosions and fire in the facility and postulated accidents due to natural phenomena, including earthquakes, tornadoes, and high velocity straight winds. The radiological analysis results indicate that CPIs are not required at the waste processing facility to mitigate the consequences of radiological release. The non-radiological analysis, however, shows that the Waste Storage Tank (WST) and the dike spill containment structures around the formic acid tanks in the cold chemical feed area and waste treatment area of the facility should be identified as CPIs. Accident mitigation options are provided and discussed.

Ades, M.J. [Westinghouse Savannah River Co., Aiken, SC (United States); Garrett, R.J. [ABB Government Services, Aiken, SC (United States)

1993-10-01T23:59:59.000Z

102

Remaining Sites Verification Package for the 100-C-9:1 Main Process Sewer Collection Line, Waste Site Reclassification Form 2004-012  

SciTech Connect

The 100-C-9:1 main process sewer pipeline, also known as the twin box culvert, was a dual reinforced process sewer that collected process effluent from the 183-C and 190-C water treatment facilities, discharging at the 132-C-2 Outfall. For remedial action purposes, the 100-C-9:1 waste site was subdivided into northern and southern sections. The 100-C-9:1 subsite has been remediated to achieve the remedial action objectives specified in the Remaining Sites ROD. The results of verification sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River.

L. M. Dittmer

2007-06-11T23:59:59.000Z

103

Multicriteria decision analysis based on analytic hierarchy process in GIS environment for siting nuclear power plant in Egypt  

Science Journals Connector (OSTI)

Abstract Due to increasing demand of electrical energy and freshwater in Egypt, it is safe to assume that the decision makers will turn to nuclear power as the feasible alternative for energy. However, as time goes by, fewer sites will be available and suitable for nuclear power plant development. Site selection is a key phase of the siting process of a nuclear plant and may significantly affect the safety and cost of the facility during its entire life cycle. The siting of nuclear power plants is one of multi-criteria problems, which makes it complex. Many interrelated factors affect the process. Six constraints and twenty-two factors corresponding to safety, environment and socio-economy were considered in the siting study presented in this paper. Multi-Criteria Decision Analysis was applied during the selection of nuclear power plants site using GIS software. Three spatial decision making models were applied in this paper during site selection stage. The binary overlay (Boolean logic) with Low Risk approach in which the logical OR operator is used to determine the candidate areas. All constraints were represented in binary maps, combined and a masking layer was created to eliminate the lands considered as constraints in Arc GIS Software. The 22 factors were represented in normalized maps after unifying all of them to 01 score scales based on the philosophy of suitability criteria (factors) using the Weighted Linear Combination (WLC) method. The relative scores and weight of factors which were used in the maps conducted by pairwise comparison were fed into Expert choice software that runs the Analytic Hierarchy Process. Final composite map of potential site priorities were represented by several polygons produced in MCDA add-in as an open source tool in Arc GIS 10.1. Four sites, all located along the North western and the Red Sea coasts were chosen as Candidate sites after eliminating the lowest scoring sites The Analytic Hierarchy Process (AHP) was used to select a suitable site by pairwise comparison and by calculating eigenvectors using Expert Choice software. The sites were ranked to determine the most desirable site. The El Dabaa site was found to be most suitable, followed by the East El Negila site on the Mediterranean Sea.

A.M. Abudeif; A.A. Abdel Moneim; A.F. Farrag

2015-01-01T23:59:59.000Z

104

Atomic site sensitive processes in low energy ion-dimer collisions  

E-Print Network (OSTI)

Electron capture processes for low energy Ar9+ ions colliding on Ar2 dimer targets are investigated, focusing attention on charge sharing as a function of molecule orientation and impact parameter. A preference in charge-asymmetric dissociation channels is observed, with a strong correlation between the projectile scattering angle and the molecular ion orientation. The measurements provide here clear evidences that projectiles distinguish each atom in the target and, that electron capture from near-site atom is favored. Monte Carlo calculations based on the classical over-the-barrier model, with dimer targets represented as two independent atoms, are compared to the data. They give a new insight into the dynamics of the collision by providing, for the di erent electron capture channels, the two-dimensional probability maps p(~b), where ~b is the impact parameter vector in the molecular frame.

W. Iskandar; J. Matsumoto; A. Leredde; X. Flchard; B. Gervais; S. Guillous; D. Hennecart; A. Mry; J. Rangama; C. L. Zhou; H. Shiromaru; A. Cassimi

2014-05-12T23:59:59.000Z

105

External Technical Review for Evaluation of System Level Modeling and Simulation Tools in Support of Hanford Site Liquid Waste Process  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hanford Site Liquid Waste Process Hanford Site Liquid Waste Process September 2009 Monica C. Regalbuto Office of Waste Processing DOE/EM Kevin G. Brown Vanderbilt University and CRESP David W. DePaoli Oak Ridge National Laboratory Candido Pereira Argonne National Laboratory John R. Shultz Office of Waste Processing DOE/EM External Technical Review for Evaluation of System Level Modeling and Simulation Tools in Support of Hanford Site Liquid Waste Process September 2009 Acknowledgements The Review Team thanks Mr. Glyn Trenchard, Team Lead for Planning and Coordination Waste Disposition Project, U.S. Department of Energy--Office of River Protection, Mr. Paul Rutland, RPP System Planning Manager for Washington River Protection Solutions, and Mr. Ernie Lee,

106

Remaining Sites Verification Package for the 100-F-26:12, 1.8-m (72-in.) Main Process Sewer Pipeline, Waste Site Reclassification Form 2007-034  

SciTech Connect

The 100-F-26:12 waste site was an approximately 308-m-long, 1.8-m-diameter east-west-trending reinforced concrete pipe that joined the North Process Sewer Pipelines (100-F-26:1) and the South Process Pipelines (100-F-26:4) with the 1.8-m reactor cooling water effluent pipeline (100-F-19). In accordance with this evaluation, the verification sampling results support a reclassification of this site to Interim Closed Out. The results of verification sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River.

J. M. Capron

2008-04-29T23:59:59.000Z

107

Integration of a Process Waste Gas into a Site's Energy Concept  

E-Print Network (OSTI)

In 1996, the BASF Corporation's Geismar, Louisiana site determined that the increased steam demands of their aggressive investment program would require them to expand their steam generation capacity. The site had operated a gas turbine based...

Peterson, J.

108

Site selection and preliminary evaluation of potential solar-industrial-process-heat applications for federal buildings in Texas  

SciTech Connect

The potential for solr process heat applications for federal buildings in Texas is assessed. The three sites considered are Reese Air Force Base, Lubbock; Fort Bliss, El Paso; and Dyess Air Force Base, Abilene. The application at Lubbock is an electroplating and descaling facility for aircraft maintenance. The one at El Paso is a laundry facility. The Abilene system would use solar heat to preheat boiler feedwater makeup for the base hospital boiler plant. The Lubbock site is found to be the most appropriate one for a demonstration plant, with the Abilene site as an alternate. The processes at each site are described. A preliminary evaluation of the potential contribution by solar energy to the electroplating facility at Reese AFB is included. (LEW)

Branz, M A

1980-09-30T23:59:59.000Z

109

Savannah River Site- Salt Waste Processing Facility: Briefing on the Salt Waste Processing Facility Independent Technical Review  

Energy.gov (U.S. Department of Energy (DOE))

This is a presentation outlining the Salt Waste Processing Facility process, major risks, approach for conducting reviews, discussion of the findings, and conclusions.

110

Review of the Savannah River Site Salt Waste Processing Facility Safety Basis and Design Development, August 2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Savannah River Site Salt Waste Processing Facility Safety Basis and Design Development May 2011 August 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose.................................................................................................................................................... 1 2.0 Background ............................................................................................................................................. 1 3.0 Scope and Methodology ......................................................................................................................... 2 4.0 Results .................................................................................................................................................... 3

111

RIFLE TO SAN JUAN  

Office of Environmental Management (EM)

i c North we s t Laboratori e s , R i c h l a n d , Wa s h i n g ton . J u l y 1 9 8 1 . Ph i l l i p s , R . D . , et al . E f fe c t s o f El ectri c F i e l d s o n La rge An i...

112

Type B Accident Investigation Board Report of the Savannah River Site Hand Injury at the Salt Waste Processing Facility on October 6, 2009  

Energy.gov (U.S. Department of Energy (DOE))

This report documents the results of the Type B Accident Investigation Board (Board) investigation of the October 6, 2009, hand injury at the Department of Energy (DOE) Savannah River Site (SRS) Salt Waste Processing Facility construction site.

113

Savannah River Site - Salt Waste Processing Facility: Briefing on the Salt Waste Processing Facility Independent Technical Review  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Salt Waste Processing Facility Independent Technical Review Harry Harmon January 9, 2007 2 U.S. Department of Energy Outline * SWPF Process Overview * Major Risks * Approach for Conducting Review * Discussion of Findings * Conclusions 3 U.S. Department of Energy Salt Waste Processing Facility 4 U.S. Department of Energy SWPF Process Overview Alpha Finishing Process CSSX Alpha Strike Process MST/ Sludge Cs Strip Effluent DSS 5 U.S. Department of Energy BOTTOM LINE The SWPF Project is ready to move into final design. 6 U.S. Department of Energy Major Risks * Final geotechnical data potentially could result in redesign of the PC-3 CPA base mat and structure. * Cost and schedule impacts arising from the change from ISO-9001 to NQA-1 quality assurance requirements. * The "de-inventory, flush, and then hands-on

114

Savannah River Site Salt Waste Processing Facility Technology Readiness Assessment Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Salt Waste Processing Facility Salt Waste Processing Facility Technology Readiness Assessment Report Kurt D. Gerdes Harry D. Harmon Herbert G. Sutter Major C. Thompson John R. Shultz Sahid C. Smith July 13, 2009 Prepared by the U.S. Department of Energy Washington, D.C. SRS Salt Waste Processing Facility Technology Readiness Assessment July 13, 2009 ii This page intentionally left blank SRS Salt Waste Processing Facility Technology Readiness Assessment July 13, 2009 iii SRS Salt Waste Processing Facility Technology Readiness Assessment July 13, 2009 iii Signatures SRS Salt Waste Processing Facility Technology Readiness Assessment July 13, 2009 iv This page intentionally left blank SRS Salt Waste Processing Facility

115

Review of the Hanford Site CH2M Hill Plateau Remediation Company Implementation Verification Review Processes, November 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Oversight Review Independent Oversight Review of the Hanford Site CH2M Hill Plateau Remediation Company Implementation Verification Review Processes November 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose ................................................................................................................................................... 1 2.0 Background ............................................................................................................................................ 1 3.0 Scope...................................................................................................................................................... 2

116

Review of the Hanford Site CH2M Hill Plateau Remediation Company Implementation Verification Review Processes, November 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

Independent Oversight Review Independent Oversight Review of the Hanford Site CH2M Hill Plateau Remediation Company Implementation Verification Review Processes November 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose ................................................................................................................................................... 1 2.0 Background ............................................................................................................................................ 1 3.0 Scope...................................................................................................................................................... 2

117

An approach for sampling solid heterogeneous waste at the Hanford Site waste receiving and processing and solid waste projects  

SciTech Connect

This paper addresses the problem of obtaining meaningful data from samples of solid heterogeneous waste while maintaining sample rates as low as practical. The Waste Receiving and Processing Facility, Module 1, at the Hanford Site in south-central Washington State will process mostly heterogeneous solid wastes. The presence of hazardous materials is documented for some packages and unknown for others. Waste characterization is needed to segregate the waste, meet waste acceptance and shipping requirements, and meet facility permitting requirements. Sampling and analysis are expensive, and no amount of sampling will produce absolute certainty of waste contents. A sampling strategy is proposed that provides acceptable confidence with achievable sampling rates.

Sexton, R.A.

1993-03-01T23:59:59.000Z

118

Integrated system for gathering, processing, and reporting data relating to site contamination  

DOE Patents (OSTI)

An integrated screening system comprises an intrusive sampling subsystem, a field mobile laboratory subsystem, a computer assisted design/geographical information subsystem, and a telecommunication linkup subsystem, all integrated to provide synergistically improved data relating to the extent of site soil/groundwater contamination. According to the present invention, data samples related to the soil, groundwater or other contamination of the subsurface material are gathered and analyzed to measure contaminants. Based on the location of origin of the samples in three-dimensional space, the analyzed data are transmitted to a location display. The data from analyzing samples and the data from the locating the origin are managed to project the next probable sample location. The next probable sample location is then forwarded for use as a guide in the placement of ensuing sample location, whereby the number of samples needed to accurately characterize the site is minimized. 10 figs.

Long, D.D.; Goldberg, M.S.; Baker, L.A.

1997-11-11T23:59:59.000Z

119

Assessment of microbial processes on gas production at radioactive low-level waste disposal sites  

SciTech Connect

Factors controlling gaseous emanations from low level radioactive waste disposal sites are assessed. Importance of gaseous fluxes of methane, carbon dioxide, and possible hydrogen from the site, stems from the inclusion of tritium and/or carbon-14 into the elemental composition of these compounds. In that the primary source of these gases is the biodegradation of organic components of the waste material, primary emphasis of the study involved an examination of the biochemical pathways producing methane, carbon dioxide, and hydrogen, and the environmental parameters controlling the activity of the microbial community involved. Initial examination of the data indicates that the ecosystem is anaerobic. As the result of the complexity of the pathway leading to methane production, factors such as substrate availability, which limit the initial reaction in the sequence, greatly affect the overall rate of methane evolution. Biochemical transformations of methane, hydrogen and carbon dioxide as they pass through the soil profile above the trench are discussed. Results of gas studies performed at three commercial low level radioactive waste disposal sites are reviewed. Methods used to obtain trench and soil gas samples are discussed. Estimates of rates of gas production and amounts released into the atmosphere (by the GASFLOW model) are evaluated. Tritium and carbon-14 gaseous compounds have been measured in these studies; tritiated methane is the major radionuclide species in all disposal trenches studied. The concentration of methane in a typical trench increases with the age of the trench, whereas the concentration of carbon dioxide is similar in all trenches.

Weiss, A.J.; Tate, R.L. III; Colombo, P.

1982-05-01T23:59:59.000Z

120

Salt Processing at the Savannah River Site: Results of Technology Down-Selection and Research and Development to Support New Salt Waste Processing Facility  

SciTech Connect

The Department of Energy's (DOE) Savannah River Site (SRS) high-level waste (HLW) program is responsible for storage, treatment, and immobilization of HLW for disposal. The Salt Processing Project (SPP) is the salt waste (water-soluble) treatment portion of this effort. The overall SPP encompasses the selection, design, construction, and operation of technologies to prepare the salt-waste feed material for immobilization at the site's Saltstone Production Facility (SPF) and vitrification facility (Defense Waste Processing Facility [DWPF]). Major constituents that must be removed from the salt waste and sent as feed to DWPF include cesium (Cs), strontium (Sr), and actinides. In April 2000, the DOE Deputy Secretary for Project Completion (EM-40) established the SRS Salt Processing Project Technical Working Group (TWG) to manage technology development of treatment alternatives for SRS high-level salt wastes. The separation alternatives investigated included three candidate Cs-removal processes selected, as well as actinide and Sr removal that are also required as a part of each process. The candidate Cs-removal processes are: crystalline Silicotitanate Non-Elutable Ion Exchange (CST); caustic Side Solvent Extraction (CSSX); and small Tank Tetraphenylborate Precipitation (STTP). The Tanks Focus Area was asked to assist DOE by managing the SPP research and development (R&D), revising roadmaps, and developing down-selection criteria. The down-selection decision process focused its analysis on three levels: (a) identification of goals that the selected technology should achieve, (b) selection criteria that are a measure of performance of the goal, and (c) criteria scoring and weighting for each technology alternative. After identifying the goals and criteria, the TWG analyzed R&D results and engineering data and scored the technology alternatives versus the criteria. Based their analysis and scoring, the TWG recommended CSSX as the preferred alternative. This recommendation was formalized in July 2001 when DOE published the Savannah River Site Salt Processing Alternatives Final Supplemental Environmental Impact Statement (SEIS) and was finalized in the DOE Record of Decision issued in October 2001.

Lang, K.; Gerdes, K.; Picha, K.; Spader, W.; McCullough, J.; Reynolds, J.; Morin, J. P.; Harmon, H. D.

2002-02-26T23:59:59.000Z

Note: This page contains sample records for the topic "rifle processing site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

INDEPENDENT TECHNICAL EVALUATION AND RECOMMENDATIONS FOR CONTAMINATED GROUNDWATER AT THE DEPARTMENT OF ENERGY OFFICE OF LEGACY MANAGEMENT RIVERTON PROCESSING SITE  

SciTech Connect

The U.S. Department of Energy Office of Legacy Management (DOE-LM) manages the legacy contamination at the Riverton, WY, Processing Site a former uranium milling site that operated from 1958 to 1963. The tailings and associated materials were removed in 1988-1989 and contaminants are currently flushing from the groundwater. DOE-LM commissioned an independent technical team to assess the status of the contaminant flushing, identify any issues or opportunities for DOE-LM, and provide key recommendations. The team applied a range of technical frameworks spatial, temporal, hydrological and geochemical in performing the evaluation. In each topic area, an in depth evaluation was performed using DOE-LM site data (e.g., chemical measurements in groundwater, surface water and soil, water levels, and historical records) along with information collected during the December 2013 site visit (e.g., plant type survey, geomorphology, and minerals that were observed, collected and evaluated). A few of the key findings include: ? Physical removal of the tailings and associated materials reduced contaminant discharges to groundwater and reduced contaminant concentrations in the near-field plume. ? In the mid-field and far-field areas, residual contaminants are present in the vadose zone as a result of a variety of factors (e.g., evaporation/evapotranspiration from the capillary fringe and water table, higher water levels during tailings disposal, and geochemical processes). ? Vadose zone contaminants are widely distributed above the plume and are expected to be present as solid phase minerals that can serve as secondary sources to the underlying groundwater. The mineral sample collected at the site is consistent with thermodynamic predictions. ? Water table fluctuations, irrigation, infiltration and flooding will episodically solubilize some of the vadose zone secondary source materials and release contaminants to the groundwater for continued down gradient migration extending the overall timeframe for flushing. ? Vertical contaminant stratification in the vadose zone and surficial aquifer will vary from location to location. Soil and water sampling strategies and monitoring well construction details will influence characterization and monitoring data. ? Water flows from the Wind River, beneath the Riverton Processing Site and through the plume toward the Little Wind River. This base flow pattern is influenced by seasonal irrigation and other anthropogenic activities, and by natural perturbations (e.g., flooding). ? Erosion and reworking of the sediments adjacent to the Little Wind River results in high heterogeneity and complex flow and geochemistry. Water flowing into oxbow lakes (or through areas where oxbow lakes were present in the past) will be exposed to localized geochemical conditions that favor chemical reduction (i.e., naturally reduced zones) and other attenuation processes. This attenuation is not sufficient to fully stabilize the plume or to reduce contaminant concentrations in the groundwater to target levels. Consistent with these observations, the team recommended increased emphasis on collecting data in the zones where secondary source minerals are projected to accumulate (e.g., just above the water table) using low cost methods such as x-ray fluorescence. The team also suggested several low cost nontraditional sources of data that have the potential to provide supplemental data (e.g., multispectral satellite imagery) to inform and improve legacy management decisions. There are a range of strategies for management of the legacy contamination in the groundwater and vadose zone near the Riverton Processing Site. These range from the current strategy, natural flushing, to intrusive remedies such as plume scale excavation of the vadose zone and pump & treat. Each option relates to the site specific conditions, issues and opportunities in a unique way. Further, each option has advantages and disadvantages that need to be weighed. Scoping evaluation was performed for three major classes

Looney, B.; Denham, M.; Eddy-Dilek, C.

2014-05-06T23:59:59.000Z

122

Processing and geologic analysis of conventional cores from well ER-20-6 No. 1, Nevada Test Site  

SciTech Connect

In 1996, Well Cluster ER-20-6 was drilled on Pahute Mesa in Area 20, in the northwestern corner of the Nevada Test Site (NTS). The three wells of the cluster are located from 166 to 296 meters (m) (544 to 971 feet [ft]) southwest of the site of the underground nuclear test code-named BULLION, conducted in 1990 in Emplacement Hole U-20bd. The well cluster was planned to be the site of a forced-gradient experiment designed to investigate radionuclide transport in groundwater. To obtain additional information on the occurrence of radionuclides, nature of fractures, and lithology, a portion of Well ER-20-6 No. 1, the hole closest to the explosion cavity, was cored for later analysis. Bechtel Nevada (BN) geologists originally prepared the geologic interpretation of the Well Cluster ER-20-6 site and documented the geology of each well in the cluster. However, the cores from Well ER-20-6 No. 1 were not accessible at the time of that work. As the forced-gradient experiment and other radio nuclide migration studies associated with the well cluster progressed, it was deemed appropriate to open the cores, describe the geology, and re-package the core for long-term air-tight storage. This report documents and describes the processing, geologic analysis, and preservation of the conventional cores from Well ER20-6 No. 1.

Prothro, L.B., Townsend, M.J.; Drellack, S.L. Jr. [and others

1997-09-01T23:59:59.000Z

123

FConnects the former technological and industrial uses of the site with the potential of reestablishing natu-ral processes once endemic on the site.  

E-Print Network (OSTI)

infrastructure. From the late 1950's it served as the site for a gravel and sand quarry. And, shortly after until today, it functions as a site of remediation, in an attempt to correct the contamination issues

Goodman, Robert M.

124

Process for carbonaceous material conversion and recovery of alkali metal catalyst constituents held by ion exchange sites in conversion residue  

DOE Patents (OSTI)

In a coal gasification operation or similar conversion process carried out in the presence of an alkali metal-containing catalyst wherein solid particles containing alkali metal residues are produced, alkali metal constituents are recovered for the particles by contacting or washing them with an aqueous solution containing calcium or magnesium ions in an alkali metal recovery zone at a low temperature, preferably below about 249.degree. F. During the washing or leaching process, the calcium or magnesium ions displace alkali metal ions held by ion exchange sites in the particles thereby liberating the ions and producing an aqueous effluent containing alkali metal constituents. The aqueous effluent from the alkali metal recovery zone is then recycled to the conversion process where the alkali metal constituents serve as at least a portion of the alkali metal constituents which comprise the alkali metal-containing catalyst.

Sharp, David W. (Seabrook, TX)

1980-01-01T23:59:59.000Z

125

Waste reduction assistance program (WRAP) on-site consultation audit report: Seafood processing plant  

SciTech Connect

The waste audit study was conducted at a seafood processing plant in Alaska. The report discusses process descriptions, waste types and quantities, current waste and materials management practices, and waste reduction alternatives. The company's current practices include use of fish waste, burning of used oil and solvents, and water conservation. Additional opportunities include microfiltration of solvents and oils, recycling of used batteries, inventory control and formation of a waste reduction team. Appendices include a summary of state regulations, a fact sheet on used oil, and a list of vendors and services.

Not Available

1989-07-29T23:59:59.000Z

126

Retrieval process development and enhancements pulsed-air mixing DOE site assessment  

SciTech Connect

The purpose of this report is to document the potential application of pulsed-air mixers to the slurry-mixing needs of the US Department of Energy`s waste retrieval programs. Pulsed-air mixers offer considerable cost and operational advantages compared to the baseline slurry mixing approach. Pulsed-air mixers should be deployed wherever it can be shown that their mixing performance will be adequate. This work was funded through the EM-50 Tanks Focus Area as part of the Retrieval Process Development and Enhancements (RPD&E) Project at the Pacific Northwest National Laboratory (PNNL). The mission of RPD&E is to understand retrieval processes, including emerging and existing processes, gather performance data on those processes, and relate the data to specific tank problems to provide end users with the requisite technical bases to make retrieval and closure decisions. Pulsed-air mixing is a commercially available technology (from Pulsair Systems, Inc.) and is used extensively in the lube oil mixing industry, municipal wastewater treatment plants, and other applications.

Powell, M.R.

1997-05-01T23:59:59.000Z

127

An Expert Elicitation Process in Support of Groundwater Model Evaluation for Frenchman Flat, Nevada National Security Site  

SciTech Connect

The U.S. Department of Energy is implementing corrective actions at facilities where nuclear-related operations were conducted in Nevada. Among the most significant sites being addressed are the locations of underground nuclear tests on the Nevada National Security Site (NNSS). The process for implementing corrective actions for the Underground Test Area (UGTA) locations is defined in Appendix VI of a Federal Facility Agreement and Consent Order (1996, as amended). In broad terms, Appendix VI describes a Corrective Action Investigation followed by a Corrective Action Decision, and implementation of a Corrective Action Plan prior to closure. The Frenchman Flat Corrective Action Unit (CAU) is farthest along in the UGTA corrective action process. It includes ten underground tests within the Frenchman Flat topographic basin, in the southeastern portion of the NNSS. Data have been collected from drilling exploration, hydrologic testing, and field and laboratory studies. Modeling has been completed at a variety of scales and focusing on a variety of flow and transport aspects ranging from regional boundary conditions to process dynamics within a single nuclear cavity. The culmination of the investigations is a transport model for the Frenchman Flat CAU (Stoller Navarro Joint Venture, 2009) that has undergone rigorous peer review and been accepted by the State of Nevada, setting the stage for the Corrective Action Decision and progression from the investigation phase to the corrective action phase of the project.

Chapman Jenny,Pohlmann Karl

2011-02-01T23:59:59.000Z

128

No Measurable Changes in 238U/235U due to DesorptionAdsorption of U(VI) from Groundwater at the Rifle, Colorado, Integrated Field Research Challenge Site  

Science Journals Connector (OSTI)

Uranium (U) is an element of considerable interest due to its importance for energy and weapons industries and its contribution to the risk associated with radioactive waste storage and disposal. ... (21)In the case of adsorption, where the U redox state does not change, differences between the coordination environments of the adsorbed and dissolved U(VI) species are suggested to be responsible for the isotope effect. ... We expect little isotope fractionation occurs with adsorption of uranyl carbonato and calcium-uranyl carbonato complexes, as outer-sphere complexes should not alter the local U(VI) environment. ...

Alyssa E. Shiel; Parker G. Laubach; Thomas M. Johnson; Craig C. Lundstrom; Philip E. Long; Kenneth H. Williams

2013-02-05T23:59:59.000Z

129

Microsoft Word - S05775_2009 VMR.doc  

Office of Legacy Management (LM)

Report Report for the Old and New Rifle, Colorado, Processing Sites September 2009 LMS/RFO/RFN/S05775 This page intentionally left blank LMS/RFO/RFN/S05775 2009 Verification Monitoring Report for the Old and New Rifle, Colorado, Processing Sites September 2009 This page intentionally left blank U.S. Department of Energy 2009 Verification Monitoring Report for the Old and New Rifle, Colorado, Processing Sites September 2009 Doc. No. S05775 Page i Contents Abbreviations................................................................................................................................. iii 1.0 Introduction............................................................................................................................

130

Environmental Management Construction Project Review of the Savannah River Site Salt Waste Processing Facility, July 19-22, 210  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Independent Oversight's Office of Environment, Safety and Health Office of Independent Oversight's Office of Environment, Safety and Health Evaluations Activity Report for the Shadowing of the Environmental Management Construction Project Review of the Savannah River Site Salt Waste Processing Facility on July 19-22, 2010 A Department of Energy Construction Project Review (CPR) of the Salt Waste Processing Facility (SWPF) project was conducted on July 19-22, 2010, at the request of the Principal Deputy Secretary, Office of Environmental Management (EM-2). The purpose of the review was to assess the cost, schedule, and technical progress against the approved Performance Baseline. Specific review areas were Engineering; Commissioning; Environment, Safety, Health, and Quality Assurance; Cost, Schedule, and Risk; and Management and Acquisition.

131

DEPLOYMENT OF INNOVATIVE CHARACTERIZATION TECHNOLOGIES AND IMPLEMENTATION OF THE MARSSIM PROCESS AT RADIOLOGICALLY CONTAMINATED SITES.  

SciTech Connect

The success of this Accelerated Site Technology Deployment (ASTD) project is measured on several levels. First, the deployment of this innovative approach using in situ characterization, portable field laboratory measurements, and implementation of MARSSIM was successfully established for all three phases of D and D characterization, i.e., pre-job scoping, on-going disposition of waste, and final status surveys upon completion of the activity. Unlike traditional D and D projects, since the Brookhaven Graphite Research Reactor Decommissioning Project (BGRR-DP) is operating on an accelerated schedule, much of the work is being carried out simultaneously. Rather than complete a full characterization of the facility before D and D work begins, specific removal actions require characterization as the activity progresses. Thus, the need for rapid and cost-effective techniques for characterization is heightened. Secondly, since the approach used for this ASTD project was not thoroughly proven prior to deployment, a large effort was devoted to demonstrating technical comparability to project managers, regulators and stakeholders. During the initial phases, large numbers of replicate samples were taken and analyzed by conventional baseline techniques to ensure that BGRR-DP quality assurance standards were met. ASTD project staff prepared comparisons of data gathered using ISOCS and BetaScint with traditional laboratory methods and presented this information to BGRR-DP staff and regulators from EPA Region II, NYS Department of Environmental Conservation, and the Suffolk County Board of Health. As the results of comparability evaluations became available, approval for these methods was received and the techniques associated with in situ characterization, portable field laboratory measurements, and implementation of MARSSIM were gradually integrated into BGRR-DP procedures.

KALB,P.D.; MILIAN,L.; LUCKETT,L.; WATTERS,D.; MILLER,K.M.; GOGOLAK,C.

2001-05-01T23:59:59.000Z

132

Surface and subsurface cleanup protocol for radionuclides Gunnison, Colorado, UMTRA Project Processing Site. Revision 3, Final report  

SciTech Connect

The supplemental standards provisions of Title 40, Code of Federal Regulations, Part 192 (40 CFR Part 192) require the cleanup of radionuclides other than radium-226 (Ra-226) to levels ``as low as reasonably achievable`` (ALARA), taking into account site-specific conditions, if sufficient quantities and concentrations are present to constitute a significant radiation hazard. In this context, thorium-230 (Th-230) at the Gunnison, Colorado, processing site will require remediation. However, a seasonally fluctuating groundwater table at the site significantly complicates conventional remedial action with respect to cleanup. Characterization data indicate that in the offpile areas, the removal of residual in situ bulk Ra-226 and Th-230 such that the 1000-year projected Ra-226 concentration (Ra-226 concentration in 1000 years due to the decay of in situ Ra-226 and the in-growth of Ra-226 from in situ Th-230) complies with the US Environmental Protection Agency (EPA) cleanup standard for in situ Ra-226 and the cleanup protocol for in situ Th-230 can be readily achieved using conventional excavation techniques for bulk contamination without encountering significant impacts due to groundwater. The EPA cleanup standard and criterion for Ra-226 and the 1000-year projected Ra-226 are 5 and 15 picocuries per gram (pCi/g) above background, respectively, averaged over 15-centimeter (cm) deep surface and subsurface intervals and 100-square-meter (m{sup 2}) grid areas. Significant differential migration of Th-230 relative to Ra-226 has occurred over 40 percent of the subpile area. To effectively remediate the site with respect to Ra-226 and Th-230, supplemental standard is proposed and discussed in this report.

Not Available

1994-05-01T23:59:59.000Z

133

Processing capabilties for the elimination of contaminated metal scrapyards at DOE/ORO-managed sites. [Metal smelting facility  

SciTech Connect

Capabilities exist for reducing all the contaminated nickel, aluminum, and copper scrap to ingot form by smelting. Processing these metals at existing facilities could be completed in about 5 or 6 years. However, these metals represent only about 20% of the total metal inventories currently on hand at the DOE/ORO-managed sites. No provisions have been made for the ferrous scrap. Most of the ferrous scrap is unclassified and does not require secured storage. Also, the potential resale value of the ferrous scrap at about $100 per ton is very low in comparison. Consequently, this scrap has been allowed to accumulate. With several modifications and equipment additions, the induction melter at PGDP could begin processing ferrous scrap after its commitment to nickel and aluminum. The PGDP smelter is a retrofit installation, and annual throughput capabilities are limited. Processing of the existing ferrous scrap inventories would not be completed until the FY 1995-2000 time frame. An alternative proposal has been the installation of induction melters at the other two enrichment facilities. Conceptual design of a generic metal smelting facility is under way. The design study includes capital and operating costs for scrap preparation through ingot storage at an annual throughput of 10,000 tons per year. Facility design includes an induction melter with the capability of melting both ferrous and nonferrous metals. After three years of operation with scrapyard feed, the smelter would have excess capacity to support on-site decontamination and decomissioning projects or upgrading programs. The metal smelting facility has been proposed for FY 1984 line item funding with start-up operations in FY 1986.

Mack, J.E.; Williams, L.C.

1982-01-01T23:59:59.000Z

134

Modelling the energy performance of a farm-scale cellulose to ethanol process with on-site cellulase production and anaerobic digestion  

Science Journals Connector (OSTI)

Abstract A farm-scale process for converting wheat straw to ethanol was modelled to assess its energy performance. The process incorporates the on-site production of crude unprocessed liquid cellulase produced via solid-state fermentation, and the anaerobic digestion of process residues to supply heat and electricity. Results include energy yield ratios from 6 to 9, reductions of 8090 % in the energy required to produce and transport the cellulase compared to commercial preparations, and a net surplus of on-site heat and electricity. From these improvements in process efficiency, environmental benefits follow.

Mitchell Lever

2015-01-01T23:59:59.000Z

135

Site Index - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Site Index Site Index Calendar Hanford Blog Archive Search Site Feeds Site Index Weather What's New Site Index Email Email Page | Print Print Page |Text Increase Font Size Decrease...

136

REVISED FINAL REPORT INDEPENDENT VERIFICATION SURVEY ACTIVITIES AT THE SEPARATIONS PROCESS RESEARCH UNIT SITES, NISKAYUNA, NEW YORK DCN 0496-SR-06-1  

SciTech Connect

The Separations Process Research Unit (SPRU) complex located on the Knolls Atomic Power Laboratory (KAPL) site in Niskayuna, New York, was constructed in the late 1940s to research the chemical separation of plutonium and uranium (Figure A-1). SPRU operated as a laboratory scale research facility between February 1950 and October 1953. The research activities ceased following the successful development of the reduction oxidation and plutonium/uranium extraction processes. The oxidation and extraction processes were subsequently developed for large scale use by the Hanford and Savannah River sites (aRc 2008a). Decommissioning of the SPRU facilities began in October 1953 and continued through the 1990s.

Evan Harpenau

2011-10-10T23:59:59.000Z

137

Microsoft Word - S06654_ESL.doc  

Office of Legacy Management (LM)

Analysis and Geochemical Analysis and Geochemical Modeling of Vanadium Contamination in Groundwater New Rifle Processing Site, Colorado July 2010 LMS/RFN/S06654 ESL-RPT-2010-01 This page intentionally left blank LMS/RFN/S06654 ESL-RPT-2010-01 Analysis and Geochemical Modeling of Vanadium Contamination in Groundwater New Rifle Processing Site, Colorado July 2010 This page intentionally left blank U.S. Department of Energy Analysis and Geochemical Modeling of Vanadium Contamination in Groundwater, Rifle, Colorado July 2010 Doc. No. S06654 Page i Contents Abbreviations................................................................................................................................. iii Executive Summary .........................................................................................................................v

138

Microsoft Word - S06654_ESL.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Geochemical and Geochemical Modeling of Vanadium Contamination in Groundwater New Rifle Processing Site, Colorado July 2010 LMS/RFN/S06654 ESL-RPT-2010-01 This page intentionally left blank LMS/RFN/S06654 ESL-RPT-2010-01 Analysis and Geochemical Modeling of Vanadium Contamination in Groundwater New Rifle Processing Site, Colorado July 2010 This page intentionally left blank U.S. Department of Energy Analysis and Geochemical Modeling of Vanadium Contamination in Groundwater, Rifle, Colorado July 2010 Doc. No. S06654 Page i Contents Abbreviations................................................................................................................................. iii Executive Summary .........................................................................................................................v

139

Review of the Hanford Site Waste Treatment and Immobilization Plant Low Activity Waste Melter Process System Hazards Analysis Activity, December 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the Hanford Site the Hanford Site Waste Treatment and Immobilization Plant Low Activity Waste Melter Process System Hazards Analysis Activity December 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose ................................................................................................................................................. 1 2.0 Background.......................................................................................................................................... 1 3.0 Scope and Methodology... ................................................................................................................... 1

140

Review of the Hanford Site Waste Treatment and Immobilization Plant Low Activity Waste Melter Process System Hazards Analysis Activity, December 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

the Hanford Site the Hanford Site Waste Treatment and Immobilization Plant Low Activity Waste Melter Process System Hazards Analysis Activity December 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose ................................................................................................................................................. 1 2.0 Background.......................................................................................................................................... 1 3.0 Scope and Methodology... ................................................................................................................... 1

Note: This page contains sample records for the topic "rifle processing site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Full scale field test of the in situ air stripping process at the Savannah River integrated demonstration test site  

SciTech Connect

Under sponsorship from the US Department of Energy, technical personnel from the Savannah River Laboratory (SRL) and other DOE laboratories, universities and private industry have completed a full scale demonstration of environmental remediation using horizontal wells. This demonstration was performed as Phase I of an Integrated Demonstration Project designed to evaluate innovative remediation technologies for environmental restoration of sites contaminated with organic contaminants. The demonstration utilized two directionally drilled horizontal wells to deliver gases and extract contaminants from the subsurface. The resulting in situ air stripping process was designed to remediate soils and sediments above and below the water table as well as groundwater contaminated with volatile organic contaminants. The 139 day long test successfully removed volatile chlorinated solvents from the subsurface using the two horizontal wells. One well, approximately 300 ft (90m) long and 165 ft (50m) deep drilled below a contaminant plume in the groundwater, was used to inject air and strip the contaminants from the groundwater. A second horizontal well, approximately 175 ft (53m) long and 75 ft (23m) deep in the vadose zone, was used to extract residual contamination in the vadose zone along with the material purged from the groundwater. Pretest and posttest characterization data and monitoring data during the demonstration were collected to aid in interpretation of the test and to provide the information needed for future environmental restoration that employ directionally drilled wells as extraction or delivery systems. Contaminant concentration data and microbiological monitoring data are summarized in this report; the characterization data and geophysical monitoring data are documented in a series of related project reports.

Looney, B.B.; Hazen, T.C.; Kaback, D.S.; Eddy, C.A.

1991-06-29T23:59:59.000Z

142

Remaining Sites Verification Package for the 100-D-50:5 Process Sewers (183-DR Sedimentation Basin Drains), Waste Site Reclassification Form 2006-025  

SciTech Connect

The 100-D-50:5 subsite encompasses the southern process sewers formerly servicing the 183-DR coagulation and sedimentation basins and proximate surface runoff collection drains. The results of confirmatory sampling of pipeline sediments and underlying soils at the 100-D-50:5 subsite demonstrated that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also showed that residual contaminant concentrations are protective of groundwater and the Columbia River.

L. M. Dittmer

2007-11-06T23:59:59.000Z

143

AN APPLICATION OF THE SSHAC LEVEL 3 PROCESS TO THE PROBABILISTIC SEISMIC HAZARD ANALYSIS FOR NUCLEAR FACILITIES AT THE HANFORD SITE, EASTERN WASHINGTON, USA  

Energy.gov (U.S. Department of Energy (DOE))

An Application of the SSHAC Level 3 Process to the Probabilistic Seismic Hazard Analysis for Nuclear Facilities at the Hanford Site, Eastern Washington, USA Kevin J. Coppersmith Coppersmith Consulting, Inc. Julian J. Bommer Consultant Robert W. Bryce Pacific Northwest National Laboratory U.S. Department of Energy Natural Phenomena Hazards Meeting October 21-22, 2014 Germantown, MD

144

Process for Transition of Uranium Mill Tailings Radiation Control Act Title II Disposal Sites to the U.S. Department of Energy Office of Legacy Management for Long-Term Surveillance and Maintenance  

SciTech Connect

This document presents guidance for implementing the process that the U.S. Department of Energy (DOE) Office of Legacy Management (LM) will use for assuming perpetual responsibility for a closed uranium mill tailings site. The transition process specifically addresses sites regulated under Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) but is applicable in principle to the transition of sites under other regulatory structures, such as the Formerly Utilized Sites Remedial Action Program.

none,

2012-03-01T23:59:59.000Z

145

How does landfill leachate affect the chemical processes in a lake system downgradient from a landfill site?  

Science Journals Connector (OSTI)

A field study on the geochemical properties of a chemically-stressed limnic environment was performed in Lake Silbersee, which receives leachate water of high inorganic loading from an upgradient landfill site. T...

Thomas Striebel; Wolfgang Schfer; Stefan Peiffer

1991-01-01T23:59:59.000Z

146

EA-1406-FONSI-2003  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for for Ground Water Compliance at the New Rifle, Colorado, UMTRA Project Site AGENCY: U.S. DEPARTMENT OF ENERGY ACTION: FINDING OF NO SIGNIFICANT IMPACT (FONSI) SUMMARY: The U.S. Department of Energy (DOE) plans to implement a ground water cleanup compliance strategy for the New Rifle Uranium Mill Tailings Radiation Control Act (UMTRCA) former processing site. The proposed compliance strategy at the New Rifle site is passive remediation by natural flushing with institutional controls and monitoring. The purpose of the strategy is to comply with U.S. Environmental Protection Agency (EPA) ground lvater standards defined in Title 40 Code of Federal Regulations (CFR) Part 192. Subpart B, and in so doing, protect human health and the environment. Ground water at the New Rifle site is contaminated with residual radioactive materials

147

Identification of Process Hazards and Accident Scenarios for Site 300 B-Division Firing Areas, Lawrence Livermore National Laboratory  

SciTech Connect

This report describes a hazard and accident analysis conducted for Site 300 operations to support update of the ''Site 300 B-Division Firing Areas Safety Analysis Report'' (SAR) [LLNL 1997]. A significant change since the previous SAR is the construction and the new Contained Firing Facility (CFF). Therefore, this hazard and accident analysis focused on the hazards associated with bunker operations to ensure that the hazards at CFF are properly characterized in the updated SAR. Hazard tables were created to cover both the CFF and the existing bunkers with ''open air'' firing tables.

Lambert, H; Johnson, G

2001-05-04T23:59:59.000Z

148

Development of an on-site ex-situ unsaturated-flow remediation process for trace metal contaminated soils.  

E-Print Network (OSTI)

??Innovative means and methods were tested to develop an economical, pragmatic and environmentally sustainable soil remediation process for heavy metal contaminated soils. An unsaturated-flow soil (more)

Andrade, Marc-David

2005-01-01T23:59:59.000Z

149

DOWNSTREAM IMPACTS OF SLUDGE MASS REDUCTION VIA ALUMINUM DISSOLUTION ON DWPF PROCESSING OF SAVANNAH RIVER SITE HIGH LEVEL WASTE - 9382  

SciTech Connect

The SRS sludge that was to become a major fraction of Sludge Batch 5 (SB5) for the Defense Waste Processing Facility (DWPF) contained a large fraction of H-Modified PUREX (HM) sludge, containing a large fraction of aluminum compounds that could adversely impact the processing and increase the vitrified waste volume. It is beneficial to reduce the non-radioactive fraction of the sludge to minimize the number of glass waste canisters that must be sent to a Federal Repository. Removal of aluminum compounds, such as boehmite and gibbsite, from sludge can be performed with the addition of NaOH solution and heating the sludge for several days. Preparation of SB5 involved adding sodium hydroxide directly to the waste tank and heating the contents to a moderate temperature through slurry pump operation to remove a fraction of this aluminum. The Savannah River National Laboratory (SRNL) was tasked with demonstrating this process on actual tank waste sludge in our Shielded Cells Facility. This paper evaluates some of the impacts of aluminum dissolution on sludge washing and DWPF processing by comparing sludge processing with and without aluminum dissolution. It was necessary to demonstrate these steps to ensure that the aluminum removal process would not adversely impact the chemical and physical properties of the sludge which could result in slower processing or process upsets in the DWPF.

Pareizs, J; Cj Bannochie, C; Michael Hay, M; Daniel McCabe, D

2009-01-14T23:59:59.000Z

150

Development of a Performance and Processing Property Acceptance Region for Cementitious Low-Level Waste Forms at Savannah River Site - 13174  

SciTech Connect

The Saltstone Production and Disposal Facilities (SPF and SDF) at the Savannah River Site (SRS) have been treating decontaminated salt solution, a low-level aqueous waste stream (LLW) since facility commissioning in 1990. In 2012, the Saltstone Facilities implemented a new Performance Assessment (PA) that incorporates an alternate design for the disposal facility to ensure that the performance objectives of DOE Order 435.1 and the National Defense Authorization Act (NDAA) of Fiscal Year 2005 Section 3116 are met. The PA performs long term modeling of the waste form, disposal facility, and disposal site hydrogeology to determine the transport history of radionuclides disposed in the LLW. Saltstone has been successfully used to dispose of LLW in a grout waste form for 15 years. Numerous waste form property assumptions directly impact the fate and transport modeling performed in the PA. The extent of process variability and consequence on performance properties are critical to meeting the assumptions of the PA. The SPF has ensured performance property acceptability by way of implementing control strategies that ensure the process operates within the analyzed limits of variability, but efforts continue to improve the understanding of facility performance in relation to the PA analysis. A similar understanding of the impact of variability on processing parameters is important from the standpoint of the operability of the production facility. The fresh grout slurry properties (particularly slurry rheology and the rate of hydration and structure formation) of the waste form directly impact the pressure and flow rates that can be reliably processed. It is thus equally important to quantify the impact of variability on processing parameters to ensure that the design basis assumptions for the production facility are maintained. Savannah River Remediation (SRR) has been pursuing a process that will ultimately establish a property acceptance region (PAR) to incorporate elements important to both processability and long-term performance properties. This process involves characterization of both emplaced product samples from the disposal facility and laboratory-simulated samples to demonstrate the effectiveness of the lab simulation. With that basis confirmed, a comprehensive variability study using non-radioactive simulants will define the acceptable PAR, or 'operating window' for Saltstone production and disposal. This same process will be used in the future to evaluate new waste streams for disposal or changes to the existing process flowsheet. (authors)

Staub, Aaron V. [Savannah River Remediation, Aiken, SC 29808 (United States)] [Savannah River Remediation, Aiken, SC 29808 (United States); Reigel, Marissa M. [Savannah River National Lab, Aiken, SC 29808 (United States)] [Savannah River National Lab, Aiken, SC 29808 (United States)

2013-07-01T23:59:59.000Z

151

Solar Site Screening Decision Tree  

Energy.gov (U.S. Department of Energy (DOE))

The solar site screening decision tree guides users through a process for screening sites for their suitability for future redevelopment with solar photovoltaic energy. EPA encourages the...

152

Iodine-131 Releases from Radioactive Lanthanum Processing at the X-10 Site in Oak Ridge, Tennessee (1944-1956)- An Assessment of Quantities released, Off-Site Radiation Doses, and Potential Excess Risks of Thyroid Cancer, Volume 1  

SciTech Connect

In the early 1990s, concern about the Oak Ridge Reservation's past releases of contaminants to the environment prompted Tennessee's public health officials to pursue an in-depth study of potential off-site health effects at Oak Ridge. This study, the Oak Ridge dose reconstruction, was supported by an agreement between the U.S. Department of Energy (DOE) and the State of Tennessee, and was overseen by a 12-member panel appointed by Tennessee's Commissioner of Health. One of the major contaminants studied in the dose reconstruction was radioactive iodine, which was released to the air by X-10 (now called Oak Ridge National Laboratory) as it processed spent nuclear reactor fuel from 1944 through 1956. The process recovered radioactive lanthanum for use in weapons development. Iodine concentrates in the thyroid gland so health concerns include various diseases of the thyroid, such as thyroid cancer. The large report, ''Iodine-131 Releases from Radioactive Lanthanum Processing at the X-10 Site in Oak Ridge, Tennessee (1944-1956) - An Assessment of Quantities Released, Off-site Radiation Doses, and Potential Excess Risks of Thyroid Cancer,'' is in two volumes. Volume 1 is the main body of the report, and Volume 1A, which has the same title, consists of 22 supporting appendices. Together, these reports serve the following purposes: (1) describe the methodologies used to estimate the amount of iodine-131 (I-131) released; (2) evaluate I-131's pathway from air to vegetation to food to humans; (3) estimate doses received by human thyroids; (4) estimate excess risk of acquiring a thyroid cancer during ones lifetime; and (5) provide equations, examples of historical documents used, and tables of calculated values. Results indicate that females born in 1952 who consumed milk from a goat pastured a few miles east of X-10 received the highest doses from I-131 and would have had the highest risks of contracting thyroid cancer. Doses from cow's milk are considerably less . Detailed dose and risk estimates, and associated uncertainties, for other contaminants studied for the Oak Ridge dose reconstruction are presented in several other technical reports. One way to easily locate them in OSTI's Information Bridge is by searching the ''report number field'' for the number DOE/OR/21981*. Be sure to place the asterisk after the base number so your search can list the complete series of reports related to Oak Ridge Dose Reconstruction.

Apostoaei, A.I.; Burns, R.E.; Hoffman, F.O.; Ijaz, T.; Lewis, C.J.; Nair, S.K.; Widner, T.E.

1999-07-01T23:59:59.000Z

153

Evapotranspiration And Geochemical Controls On Groundwater Plumes At Arid Sites: Toward Innovative Alternate End-States For Uranium Processing And Tailings Facilities  

SciTech Connect

Management of legacy tailings/waste and groundwater contamination are ongoing at the former uranium milling site in Tuba City AZ. The tailings have been consolidated and effectively isolated using an engineered cover system. For the existing groundwater plume, a system of recovery wells extracts contaminated groundwater for treatment using an advanced distillation process. The ten years of pump and treat (P&T) operations have had minimal impact on the contaminant plume primarily due to geochemical and hydrological limits. A flow net analysis demonstrates that groundwater contamination beneath the former processing site flows in the uppermost portion of the aquifer and exits the groundwater as the plume transits into and beneath a lower terrace in the landscape. The evaluation indicates that contaminated water will not reach Moenkopi Wash, a locally important stream. Instead, shallow groundwater in arid settings such as Tuba City is transferred into the vadose zone and atmosphere via evaporation, transpiration and diffuse seepage. The dissolved constituents are projected to precipitate and accumulate as minerals such as calcite and gypsum in the deep vadose zone (near the capillary fringe), around the roots of phreatophyte plants, and near seeps. The natural hydrologic and geochemical controls common in arid environments such as Tuba City work together to limit the size of the groundwater plume, to naturally attenuate and detoxify groundwater contaminants, and to reduce risks to humans, livestock and the environment. The technical evaluation supports an alternative beneficial reuse (brownfield) scenario for Tuba City. This alternative approach would have low risks, similar to the current P&T scenario, but would eliminate the energy and expense associated with the active treatment and convert the former uranium processing site into a resource for future employment of local citizens and ongoing benefit to the Native American Nations.

Looney, Brian B.; Denham, Miles E.; Eddy-Dilek, Carol A.; Millings, Margaret R.; Kautsky, Mark

2014-01-08T23:59:59.000Z

154

Geochemical Processes Data Package for the Vadose Zone in the Single-Shell Tank Waste Management Areas at the Hanford Site  

SciTech Connect

This data package discusses the geochemistry of vadose zone sediments beneath the single-shell tank farms at the U.S. Department of Energys (DOEs) Hanford Site. The purpose of the report is to provide a review of the most recent and relevant geochemical process information available for the vadose zone beneath the single-shell tank farms and the Integrated Disposal Facility. Two companion reports to this one were recently published which discuss the geology of the farms (Reidel and Chamness 2007) and groundwater flow and contamination beneath the farms (Horton 2007).

Cantrell, Kirk J.; Zachara, John M.; Dresel, P. Evan; Krupka, Kenneth M.; Serne, R. Jeffrey

2007-09-28T23:59:59.000Z

155

Hanford Site Tours - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Site Tours Hanford Site Tours Hanford Tour Restrictions Hanford Site Tours Hanford Tours for Governmental Officials Hanford Tours for Tribal Affairs Hanford Private Tours Media...

156

Uranium 238U/235U isotope ratios as indicators of reduction: Results from an in situ biostimulation experiment at Rifle, Colorado, USA  

E-Print Network (OSTI)

sandstone-type uranium deposits. Economic Geology; 1962; (5)uranium ore deposits: Isotopic signatures of the U reduction process? ; Geology,

Bopp IV, C.J.

2010-01-01T23:59:59.000Z

157

DOE - Office of Legacy Management -- LM Sites Map  

NLE Websites -- All DOE Office Websites (Extended Search)

LM Sites Map LM Sites Map LM Sites LM Sites Puerto Rico Connecticut New Jersey Massachusetts Alaska Texas Florida Arizona Missouri Colorado Utah Idaho Washington South Dakota New Mexico California Oregon Tennessee Illinois Ohio Michigan New York Pennsylvania Wyoming Nebraska West Virginia Kentucky Mississippi Nevada Select a Site Acid/Pueblo Canyon Site Adrian Site Albany Site Aliquippa Site Ambrosia Lake Disposal Site Amchitka Site Ashtabula Site Bayo Canyon Site Berkeley Site Beverly Site Bluewater Disposal Site BONUS Decommissioned Reactor Buffalo Site Burrell Disposal Site CEER Sites Canonsburg Disposal Site Central Nevada Test Area Site Chariot Site Chicago North Site Chicago South Site Chupadera Mesa Site Colonie Site Columbus Sites Columbus East Site Durango Disposal Site Durango Processing Site

158

DOE - Office of Legacy Management -- LM Sites Map  

Office of Legacy Management (LM)

LM Sites Map LM Sites Map LM Sites LM Sites Puerto Rico Connecticut New Jersey Massachusetts Alaska Texas Florida Arizona Missouri Colorado Utah Idaho Washington South Dakota New Mexico California Oregon Tennessee Illinois Ohio Michigan New York Pennsylvania Wyoming Nebraska West Virginia Kentucky Mississippi Nevada Select a Site Acid/Pueblo Canyon Site Adrian Site Albany Site Aliquippa Site Ambrosia Lake Disposal Site Amchitka Site Ashtabula Site Bayo Canyon Site Berkeley Site Beverly Site Bluewater Disposal Site BONUS Decommissioned Reactor Buffalo Site Burrell Disposal Site CEER Sites Canonsburg Disposal Site Central Nevada Test Area Site Chariot Site Chicago North Site Chicago South Site Chupadera Mesa Site Colonie Site Columbus Sites Columbus East Site Durango Disposal Site Durango Processing Site

159

Considered Sites | Department of Energy  

Office of Legacy Management (LM)

Sites » Considered Sites Sites » Considered Sites Considered Sites View Considered Sites View Other Sites DOE maintains the Considered Sites Database to provide information to the public about sites that were formerly used in the nation's nuclear weapons and early atomic energy programs and that had the potential for residual radioactive contamination on site. Formerly Utilized Sites Remedial Action Program The U.S. Atomic Energy Commission (AEC) established the Formerly Utilized Sites Remedial Action Program (FUSRAP) in March 1974 under the authority of the Atomic Energy Act of 1954 to identify, investigate, and take appropriate cleanup action at sites where work was performed in support of the Manhattan Engineer District (MED) and early AEC programs. Site activities included uranium ore storage and processing, uranium metal

160

A Conceptual model of coupled biogeochemical and hydrogeological processes affected by in situ Cr(VI) bioreduction in groundwater at Hanford 100H Site  

E-Print Network (OSTI)

in Groundwater at Hanford 100H Site B.Faybishenko, P.E.Long,Cr(VI) contaminated groundwater at Hanford 100H site. A slowHRC TM ), was injected in Hanford sediments to stimulate

2006-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "rifle processing site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Microsoft Word - S04612VMR2008  

Office of Legacy Management (LM)

Verification Monitoring Report Verification Monitoring Report for the Old and New Rifle, Colorado, Processing Sites August 2008 Office of Legacy Management LMS/RFO/RFN/S04612 Work Performed Under DOE Contract No. for the U.S. Department of Energy Office of Legacy Management. DE-AM01-07LM00060 Approved for public release; distribution is unlimited. Office of Legacy Management Office of Legacy Management Office of Legacy Management U.S. Department of Energy This page intentionally left blank LMS/RFO/RFN/S04612 2008 Verification Monitoring Report for the Old and New Rifle, Colorado, Processing Sites August 2008 This page intentionally left blank U.S. Department of Energy 2008 Verification Monitoring Report for the Old and New Rifle, Colorado, Processing Sites August 2008 Doc. No. S0461200 Page iii

162

MEASUREMENT AND CALCULATION OF RADIONUCLIDE ACTIVITIES IN SAVANNAH RIVER SITE HIGH LEVEL WASTE SLUDGE FOR ACCEPTANCE OF DEFENSE WASTE PROCESSING FACILITY GLASS IN A FEDERAL REPOSITORY  

SciTech Connect

This paper describes the results of the analyses of High Level Waste (HLW) sludge slurry samples and of the calculations necessary to decay the radionuclides to meet the reporting requirement in the Waste Acceptance Product Specifications (WAPS) [1]. The concentrations of 45 radionuclides were measured. The results of these analyses provide input for radioactive decay calculations used to project the radionuclide inventory at the specified index years, 2015 and 3115. This information is necessary to complete the Production Records at Savannah River Site's Defense Waste Processing Facility (DWPF) so that the final glass product resulting from Macrobatch 5 (MB5) can eventually be submitted to a Federal Repository. Five of the necessary input radionuclides for the decay calculations could not be measured directly due to their low concentrations and/or analytical interferences. These isotopes are Nb-93m, Pd-107, Cd-113m, Cs-135, and Cm-248. Methods for calculating these species from concentrations of appropriate other radionuclides will be discussed. Also the average age of the MB5 HLW had to be calculated from decay of Sr-90 in order to predict the initial concentration of Nb-93m. As a result of the measurements and calculations, thirty-one WAPS reportable radioactive isotopes were identified for MB5. The total activity of MB5 sludge solids will decrease from 1.6E+04 {micro}Ci (1 {micro}Ci = 3.7E+04 Bq) per gram of total solids in 2008 to 2.3E+01 {micro}Ci per gram of total solids in 3115, a decrease of approximately 700 fold. Finally, evidence will be given for the low observed concentrations of the radionuclides Tc-99, I-129, and Sm-151 in the HLW sludges. These radionuclides were reduced in the MB5 sludge slurry to a fraction of their expected production levels due to SRS processing conditions.

Bannochie, C; David Diprete, D; Ned Bibler, N

2008-12-31T23:59:59.000Z

163

Site Screening, Site Selection,  

NLE Websites -- All DOE Office Websites (Extended Search)

BEST PRACTICES for: BEST PRACTICES for: 2013 Revised Edition Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The

164

Site Screening, Site Selection,  

NLE Websites -- All DOE Office Websites (Extended Search)

BeSt PraCtICeS for: BeSt PraCtICeS for: DRAFT Edition Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The

165

site_transition.cdr  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Legacy Legacy Management U.S. DEPARTMENT OF This fact sheet explains the process for transferring a site to the U.S. Department of Energy Office of Legacy Management. Site Transition Process Upon Cleanup Completion Introduction Transition Process After environmental remediation is completed at a site and there is no continuing mission, responsibility for the site and the associated records are transferred to the U.S. Department of Energy (DOE) Office of Legacy Management for post-closure management. Where residual hazards (e.g., disposal cells, ground water contamination) remain, active long-term surveillance and maintenance will be required to ensure protection of human health and the environment. The DOE Office of Legacy Management (LM) established transition guidance for remediated sites that will transfer to LM for long-term surveillance and maintenance. The

166

Detection of hexavalent uranium with inline and field-portable immunosensors  

E-Print Network (OSTI)

Uranium Mill Tailings Remedial Action (UMTRA) site located in Rifle, CO. Detailed descriptions of the history, geology

Melton, Scott J.

2009-01-01T23:59:59.000Z

167

Application of microseismic technology to hydraulic fracture diagnostics: GRI/DOE Field Fracturing Multi-Sites Project  

SciTech Connect

The objective of the Field Fracturing Multi-Sites Project (M-Site) is to conduct field experiments and analyze data that will result in definitive determinations of hydraulic fracture dimensions using remote well and treatment well diagnostic techniques. In addition, experiments will be conducted to provide data that will resolve significant unknowns with regard to hydraulic fracture modeling, fracture fluid rheology and fracture treatment design. These experiments will be supported by a well-characterized subsurface environment as well as surface facilities and equipment conducive to acquiring high-quality data. It is anticipated that the project`s research advancements will provide a foundation for a fracture diagnostic service industry and hydraulic fracture optimization based on measured fracture response. The M-Site Project is jointly sponsored by the Gas Research Institute (GRI) and the US Department of Energy (DOE). The site developed for M-Site hydraulic fracture experimentation is the former DOE Multiwell Experiment (MWX) site located near Rifle, Colorado. The MWX project drilled three closely-spaced wells (MWX-1, MWX-2 and MWX-3) which were the basis for extensive reservoir analyses and tight gas sand characterizations in the blanket and lenticular sandstone bodies of the Mesaverde Group. The research results and background knowledge gained from the MWX project are directly applicable to research in the current M-Site Project.

Wilmer, R. [CER Corp., Las Vegas, NV (United States); Warpinski, N.R. [Sandia National Laboratories (United States); Wright, T.B. [Resources Engineering Systems (United States); Branagan, P.T. [Branagan & Associates (United States); Fix, J.E. [Fix & Associates (United States)

1995-06-01T23:59:59.000Z

168

Potential Release Sites  

NLE Websites -- All DOE Office Websites (Extended Search)

PRS PRS Potential Release Sites Legacy sites where hazardous materials are found to be above acceptable levels are collectively called potential release sites. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Less than 10 percent of the total number of potential release sites need to go through the full corrective action process. What are potential release sites? Potential release sites are areas around the Laboratory and the town of Los Alamos at which hazardous materials from past activities have been found. Some examples of potential release sites include septic tanks and associated drain lines chemical storage areas wastewater outfalls material disposal areas incinerators sumps firing ranges

169

Considered Sites | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Considered Sites Considered Sites Considered Sites View Considered Sites View Other Sites DOE maintains the Considered Sites Database to provide information to the public about sites that were formerly used in the nation's nuclear weapons and early atomic energy programs and that had the potential for residual radioactive contamination on site. Formerly Utilized Sites Remedial Action Program The U.S. Atomic Energy Commission (AEC) established the Formerly Utilized Sites Remedial Action Program (FUSRAP) in March 1974 under the authority of the Atomic Energy Act of 1954 to identify, investigate, and take appropriate cleanup action at sites where work was performed in support of the Manhattan Engineer District (MED) and early AEC programs. Site activities included uranium ore storage and processing, uranium metal

170

Microsoft Word - S07263_NatFlushing  

Office of Legacy Management (LM)

Review of the Natural Flushing Review of the Natural Flushing Groundwater Remedy at the Old Rifle Legacy Management Site, Rifle, Colorado July 2011 LMS/RFO/S07263 This page intentionally left blank LMS/RFO/S07263 Review of the Natural Flushing Groundwater Remedy at the Old Rifle Legacy Management Site, Rifle, Colorado July 2011 This page intentionally left blank U.S. Department of Energy Review of the Natural Flushing Groundwater Remedy-Old Rifle, Rifle, Colorado July 2011 Doc. No. S07263 Page i Contents Abbreviations ................................................................................................................................. iii Executive Summary .........................................................................................................................v

171

Completed Sites  

Energy.gov (U.S. Department of Energy (DOE))

The Office of Environmental Management (EM) has been or is currently responsible for cleaning up sites across the United States. These sites were associated with the legacy of the nations nuclear...

172

TRACKING SITE  

Energy Science and Technology Software Center (OSTI)

003235MLTPL00 AASG Geothermal Data submissions tracking application and site. https://github.com/usgin/aasgtrack

173

Site Transition Framework | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(April 2004) Site Transition Framework More Documents & Publications Process for Transition of Uranium Mill Tailings Radiation Control Act Title II Disposal Sites to the...

174

Independent Activity Report, Savannah River Site - September...  

Office of Environmental Management (EM)

September 2010 Independent Activity Report, Savannah River Site - September 2010 Savannah River Site Salt Waste Processing Facility Effectiveness Review The U.S. Department of...

175

The DOD Siting Clearinghouse  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The DoD Siting Clearinghouse The DoD Siting Clearinghouse Dave Belote Director, Siting Clearinghouse Office of the Secretary of Defense The Nexus of National Security & Renewable Energy * Unintended Consequences - Rapid development of renewable technologies - Rapidly changing military technology research & development * Existing Policy and Processes - Not up to date with changing technologies - Land use decision-making authorities fragmented across all levels of government 2 From Nellis to Shepherds Flat: Congressional Push for Action 3 Congressional Response - FY2011 NDAA, Section 358 * Section 358 "Study Of Effects Of New Construction Of Obstructions On Military Installations And Operations" - Integrated review process - 180-day backlog assessment

176

Nevada National Security Site - Reports  

NLE Websites -- All DOE Office Websites (Extended Search)

Reports Reports Nevada National Security Site Review Reports 2013 Independent Oversight Targeted Review of the Safety Significant Blast Door and Special Door Interlock Systems and Review of Federal Assurance Capability at the Nevada National Security Site, December 2013 Review of the Nevada National Security Site Criticality Safety Program Corrective Action Plan Closure, May 2013 Review Reports 2012 Review of the Nevada National Security Site Implementation Verification Review Processes, March 2012 Activity Reports 2012 Nevada National Security Site Operational Awareness Visit, December 2012 Operational Awareness Oversight of the Nevada National Security Site, August 2012 Review Reports 2011 Review of Nevada Site Office and National Security Technologies, LLC, Line Oversight and Contractor Assurance Systems

177

Independent Activity Report, Savannah River Site - May 2010 ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 2010 Independent Activity Report, Savannah River Site - May 2010 May 2010 Savannah River Site Salt Waste Processing Facility Construction Site Walkthrough The U.S. Department...

178

Independent Activity Report, Savannah River Site - June 2010...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 2010 Independent Activity Report, Savannah River Site - June 2010 June 2010 Savannah River Site Salt Waste Processing Facility Construction Site Orientation Visit The U.S....

179

RAPID/Geothermal/Transmission Siting & Interconnection/Nevada...  

Open Energy Info (EERE)

Siting Agency: Public Utilities Commission of Nevada Transmission Siting Transmission lines over 200 kV are handled by the state's CPCN process. Siting of transmission lines with...

180

THE USE OF GROUND-PENETRATING RADAR FOR ARCHAEOLOGY: DETERMINING SITE FORMATION PROCESSES AND SUBSURFACE FEATURES ON TUTUILA ISLAND, AMERICAN SAMOA  

E-Print Network (OSTI)

, ceremonial mound (i.e. star mound) construction details were easily seen in radar profiles. Ground penetrating radar has the potential to yield significant details about such mounds, with no physical impact to the site....

Welch, Daniel

2006-07-11T23:59:59.000Z

Note: This page contains sample records for the topic "rifle processing site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Site Visit Report, Livermore Site Office - February 2011 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site Visit Report, Livermore Site Office - February 2011 Site Visit Report, Livermore Site Office - February 2011 Site Visit Report, Livermore Site Office - February 2011 February 2011 Livermore Site Office Safety Basis Self-Assessment This site visit report documents the collective results of the Office of Health, Safety and Security's (HSS) assessment of National Nuclear Safety Administration (NNSA) Livermore Site Office (LSO) safety basis processes and discusses its scope, objective, results and conclusions. Appendix A provides lists of the documents, interviews, and observations and Appendix B includes the plan for the review. The assessment was sponsored by LSO as a self-assessment and conducted jointly by HSS and LSO staff. It was completed in late 2010 and included site visits from November 29 - December

182

CX-001631: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1631: Categorical Exclusion Determination 1631: Categorical Exclusion Determination CX-001631: Categorical Exclusion Determination Install Wells and Boreholes at the Old Rifle Colorado Processing Site CX(s) Applied: B3.1 Date: 04/15/2010 Location(s): Old Rifle, Colorado Office(s): Legacy Management The Environmental Remediation Sciences Program (ERSP) proposes to install 36 wells and 5 boreholes on the Old Rifle, Colorado, Processing Site. A combination of 13 injection wells, 18 monitoring wells, 5 multi-chambered wells, and 5 boreholes would be installed using a sonic rotary drill rig. Five of the wells would be used for U.S. Department of Energy (DOE) Office of Legacy Management (LM) groundwater monitoring purposes and the remainder (31 wells and 5 boreholes) would be installed in a single gallery (Super 8)

183

Fission product iodine during early Hanford-Site operations: Its production and behavior during fuel processing, off-gas treatment and release to the atmosphere  

SciTech Connect

The Hanford Environmental Dose Reconstruction (HEDR) Project was established to estimate the radiological dose impact that Hanford Site operations may have made on the local and regional population. This impact is estimated by examining operations involving radioactive materials that were conducted at the Hanford Site from the startup of the first reactor in 1944 to the present. HEDR Project work is divided among several technical tasks. One of these tasks, Source Terms, is designed to develop quantitative estimates of all significant emissions of radionuclides by Hanford Site operations since 1944. Radiation doses can be estimated from these emissions by accounting for specific radionuclide transport conditions and population demography. This document provides technical information to assist in the evaluation of iodine releases. 115 refs., 5 figs., 3 tabs.

Burger, L.L.

1991-05-01T23:59:59.000Z

184

Savannah River Site - Reports  

NLE Websites -- All DOE Office Websites (Extended Search)

Reports Reports Savannah River Site Review Reports 2013 Independent Oversight Review of the Savannah River Field Office Tritium Facilities Radiological Controls Activity-Level Implementation, November 2013 Independent Oversight Review of the Savannah River Site Salt Waste Processing Facility Safety Basis and Design Development, August 2013 Independent Oversight Review of the Employee Concerns Program at the Savannah River Operations Office, July 2013 Assessment of Nuclear Safety Culture at the Salt Waste Processing Facility Project, January 2013 Review of the Savannah River Site, Waste Solidification Building, Construction Quality of Mechanical Systems Installation and Selected Aspects of Fire Protection System Design, January 2013 Activity Reports 2013 Savannah River Site Waste Solidification Building Corrective Actions from the January 2013 Report on Construction Quality of Mechanical Systems Installation and Fire Protection Design, May 2013

185

Web Site Map  

NLE Websites -- All DOE Office Websites (Extended Search)

Help » Web Site Map Help » Web Site Map Web Site Map The links listed below include all pages on the site except document topic pages. Home Privacy/Security Help Web Site Map Mailing Services Remove me from the List Contact Us About Us News and Events News Archives News/Media FAQs Internet Resources Documents DUF6 EIS Historical Context What is an EIS? Why EIS is Needed Who is Responsible? EIS Process EIS Topics EIS Alternatives EIS Schedule Public Involvement Opportunities Public Comment Form For More Info DUF6 Management and Uses Management Responsibilities DUF6 Storage How DUF6 is Stored Where DUF6 is Stored Cylinder Leakage DUF6 Storage Safety DUF6 PEIS Cylinder Surveillance and Maintenance Conversion Potential DU Uses "Business Case" for R&D on Beneficial Uses of DU Catalysts for Destruction of Air Pollutants

186

Notice of Intent to Prepare a Supplemental Environmental Impact Statement for Alternatives to the In-Tank Precipitation Process at the Savannah River Site, Aiken, SC, February 19, 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 Federal Register / Vol. 64, No. 34 / Monday, February 22, 1999 / Notices Decision and publish it in the Federal Register. Signed in Washington, DC, this 16th day of February 1999. Peter N. Brush, Principal Deputy Assistant Secretary, Environment, Safety and Health. [FR Doc. 99-4289 Filed 2-19-99; 8:45 am] BILLING CODE 6450-01-P DEPARTMENT OF ENERGY Notice of Intent To Prepare a Supplemental Environmental Impact Statement for Alternatives to the In- Tank Precipitation Process at the Savannah River Site, Aiken, SC AGENCY: Department of Energy. ACTION: Notice of intent. SUMMARY: The Department of Energy (DOE) intends to prepare a supplemental environmental impact statement (SEIS) on the proposed replacement of the in-tank precipitation (ITP) process at the Savannah River Site

187

Development of Site Transition Plan, Use of the Site Transition Framework,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Development of Site Transition Plan, Use of the Site Transition Development of Site Transition Plan, Use of the Site Transition Framework, and Terms and Conditions for Site Transition Development of Site Transition Plan, Use of the Site Transition Framework, and Terms and Conditions for Site Transition This memorandum provides additional guidance on preparation of the Site Transition Plan (STP). Development of Site Transition Plan, Use of the Site Transition Framework, and Terms and Conditions for Site Transition More Documents & Publications Site Transition Summary: Cleanup Completion to Long-Term Stewardship at Department of Energy On-going Mission Sites Process for Transition of Responsibilities Process for Transition of Uranium Mill Tailings Radiation Control Act Title II Disposal Sites to the U.S. Department of Energy Office of Legacy

188

Photo Gallery - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Basins Sludge processing Sludge processing Sludge processing Sludge processing Processing sludge Processing sludge Processing sludge Processing sludge Processing sludge Processing...

189

Pseudomonas aeruginosa lasB1 mutants produce an elastase, substituted at active-site His-223, that is defective in activity, processing, and secretion.  

Science Journals Connector (OSTI)

...sensitivity to vector-encoded markers (car- benicillin and kanamycin). All eight...The product of lasB1 in E. coli was defective not only in activity but also in processing...that expres- sion of an enzymatically defective elastase inhibits proper processing of...

K S McIver; J C Olson; D E Ohman

1993-07-01T23:59:59.000Z

190

Geoarchaeological investigation of natural formation processes to evaluate context of the clovis component at the Gault site (41BL323), Bell County, Texas  

E-Print Network (OSTI)

particles of the sedimentary matrix and therefore subject to the influences of same natural processes (Butzer 1982; Hassan 1985; Isaac 1967; Schiffer 1976, 1987; Shackley 1978; Shipman 1981; Villa 1982; Waters 1992). ____________ This thesis follows... particles of the sedimentary matrix and therefore subject to the influences of same natural processes (Butzer 1982; Hassan 1985; Isaac 1967; Schiffer 1976, 1987; Shackley 1978; Shipman 1981; Villa 1982; Waters 1992). ____________ This thesis follows...

Alexander, Dawn Aileen Joyce

2008-10-10T23:59:59.000Z

191

Site Map  

NLE Websites -- All DOE Office Websites (Extended Search)

Home » Site Map Home » Site Map Site Map Home About Overview NERSC Mission Contact us Staff Center Leadership Sudip Dosanjh Select Publications Jeff Broughton Katie Antypas John Shalf Francesca Verdier Center Administration James Craw Norma Early Jeff Grounds Betsy MacGowan Zaida McCunney Lynn Rippe Suzanne Stevenson David Tooker Center Communications Jon Bashor Linda Vu Margie Wylie Kathy Kincade Advanced Technologies Group Nicholas Wright Brian Austin Research Projects Matthew Cordery Christopher Daley Analytics Group Peter Nugent David Camp Hank Childs Harinarayan Krishnan Burlen Loring Joerg Meyer Prabhat Oliver Ruebel Daniela Ushizima Gunther Weber Yushu Yao Computational Systems Group Jay Srinivasan James Botts Scott Burrow Tina Butler Nick Cardo Tina Declerck Ilya Malinov David Paul Larry Pezzaglia Iwona Sakrejda

192

Photo Gallery - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

radioactive Sludge processing Sludge processing Sludge processing Sludge processing Processing sludge Processing sludge Processing sludge Processing sludge Processing sludge...

193

Independent Oversight Review, Savannah River Site- September 2011  

Energy.gov (U.S. Department of Energy (DOE))

Review of the Implementation Verification Review Processes at the Savannah River Site Environmental Management Nuclear Facilities

194

Early Site Permit Demonstration Program: Siting Guide, Site selection and evaluation criteria for an early site permit application. Revision 1  

SciTech Connect

In August 1991, the Joint Contractors came to agreement with Sandia National Laboratories (SNL) and the Department of Energy (DOE) on a workscope for the cost-shared Early Site Permit Demonstration Program. One task within the scope was the development of a guide for site selection criteria and procedures. A generic Siting Guide his been prepared that is a roadmap and tool for applicants to use developing detailed siting plans for their specific region of the country. The guide presents three fundamental principles that, if used, ensure a high degree of success for an ESP applicant. First, the site selection process should take into consideration environmentally diverse site locations within a given region of interest. Second, the process should contain appropriate opportunities for input from the public. Third, the process should be applied so that it is clearly reasonable to an impartial observer, based on appropriately selected criteria, including criteria which demonstrate that the site can host an advanced light water reactor (ALWR). The Siting Guide provides for a systematic, comprehensive site selection process in which three basic types of criteria (exclusionary, avoidance, and suitability) are presented via a four-step procedure. It provides a check list of the criteria for each one of these steps. Criteria are applied qualitatively, as well as presented numerically, within the guide. The applicant should use the generic guide as an exhaustive checklist, customizing the guide to his individual situation.

Not Available

1993-03-24T23:59:59.000Z

195

Annual report on the U.S. Department of Energy`s cultural resource activities at Colorado UMTRA Project sites for October 1995--September 1996  

SciTech Connect

This report summarizes the results of cultural resource activities conducted by the U.S. Department of Energy (DOE) at Uranium Mill Tailings Remedial Action (UMTRA) Project sites in Colorado for the period of October 1, 1995 through September 30, 1996. The inactive uranium mill tailings sites in Colorado are at Durango, Grand Junction, Gunnison, Maybell, Naturita, Rifle, and Slick Rock. On December 6, 1984, the DOE, the Advisory Council on Historic Preservation, and the Colorado State Historic Preservation Officer (SHPO) entered into a programmatic memorandum of understanding (PMOU). This PMOU requires the DOE to fulfillment of its obligations under various state and federal regulations for the protection and preservation of cultural resources. This report provides the state of Colorado with an annual report on the cultural resource activities performed for all UMTRA Project sites in Colorado. Due to the completion of surface activities at the UMTRA Project sites, this will be the last annual report to the state of Colorado. Cultural resources activities subsequent to this report will be reported to the state through site-specific correspondence.

NONE

1996-09-01T23:59:59.000Z

196

Site Management Guide (Blue Book)  

SciTech Connect

The U.S. Department of Energy (Department) Office of Legacy Management (LM), established in 2003, manages the Departments postclosure responsibilities and ensures the future protection of human health and the environment. During World War II and the Cold War, the Federal government developed and operated a vast network of industrial facilities for the research, production, and testing of nuclear weapons, as well as other scientific and engineering research. These processes left a legacy of radioactive and chemical waste, environmental contamination, and hazardous facilities and materials at well over 100 sites. Since 1989, the Department has taken an aggressive accelerated cleanup approach to reduce risks and cut costs. At most Departmental sites undergoing cleanup, some residual hazards will remain at the time cleanup is completed due to financial and technical impracticality. However, the Department still has an obligation to protect human health and the environment after cleanup is completed. LM fulfills DOEs postclosure obligation by providing long-term management of postcleanup sites which do not have continuing missions. LM is also responsible for sites under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Currently, the U.S. Army Corps of Engineers (USACE) is responsible for site surveys and remediation at FUSRAP sites. Once remediation is completed, LM becomes responsible for long-term management. LM also has responsibility for uranium processing sites addressed by Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA). UMTRCA Title II sites are sites that were commercially owned and are regulated under a U.S. Nuclear Regulatory Commission (NRC) license. For license termination, the owner must conduct an NRC-approved cleanup of any on-site radioactive waste remaining from former uranium ore-processing operations. The site owner must also provide full funding for inspections and, if necessary, ongoing maintenance. Once site cleanup is complete, LM accepts title to these sites on behalf of the United States and assumes long-term management.

None

2014-03-01T23:59:59.000Z

197

Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

processing Demolishing large vertical tanks near U Plant Demolishing large vertical tanks near U Plant Demolishing large vertical tanks near U Plant Demolishing large vertical...

198

Site C  

Office of Legacy Management (LM)

' ' u. s. A r my Corps or Engineers Kurfal.. Ilisfr ifl om« 1776 N1 . ~lI rll Sfred , lIu fflll" , New v ur k. 14207 Site C loseout Report for th e Ashland I (Includlng Seaway Arca D), Ashland 2 and Rattlesnake Creek FUS RAP Sites To nawanda . New Yor k F ina l - Octo ber 2006 Formerl y Ut ilized Sites Remedi al Actiun Program Dt:CLAlUlfiO lO OF RF ~ I'O""" A <:n o .. ('oMnLflOI'O '" 1 S-~1 1 A "n· nvnn: S Ill: C'lO'iU 'U l RtrUlIT f OR A SlIu x u l (I "ICLU I ING S t:A" ·,H A RU D j, AS H I .A ~O 2 A."n RAnU:M'AKf eRU" ~ rn~ I!d'on at A.hland 1 (Ind udonl Seaway Area DJ. Ashland 2 and kan~snak c Creek is Wi,...... 1c in acwr.hnu willi ~ Rcconl or Oecisim (ROD) . igned 00> April 20. 1998 and l'.1pbIWlOII <;If

199

Savannah River Site - Enforcement Documents  

NLE Websites -- All DOE Office Websites (Extended Search)

Enforcement Documents Enforcement Documents Savannah River Site Preliminary Notice of Violation issued to Savannah River Nuclear Solutions, LLC related to a Puncture Wound Injury resulting in a Radiological Uptake at the Savannah River Site, July 22, 2011 (NEA-2011-02) Consent Order issued to Parsons Infrastructure & Technology Group, Inc., related to Nuclear Facility Construction Deficiencies and Subcontractor Oversight at the Salt Waste Processing Facility at the Savannah River Site, April 13, 2010 Enforcement Letter issued to Amer Industrial Technologies, Inc. related to Weld Deficiencies at the Salt Waste Processing Facility at the Savannah River Site, April 13, 2010 Enforcement Letter issued to Parsons Technology Development & Fabrication Complex related to Deficiencies in the Fabrication of Safety Significant Embed Plates at the Salt Waste Processing Facility at the Savannah River Site, April 13, 2010

200

Photo Gallery - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

knockout Sludge processing Sludge processing Sludge processing Sludge processing Processing sludge Processing sludge...

Note: This page contains sample records for the topic "rifle processing site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

USE OF AN EQUILIBRIUM MODEL TO FORECAST DISSOLUTION EFFECTIVENESS, SAFETY IMPACTS, AND DOWNSTREAM PROCESSABILITY FROM OXALIC ACID AIDED SLUDGE REMOVAL IN SAVANNAH RIVER SITE HIGH LEVEL WASTE TANKS 1-15  

SciTech Connect

This thesis details a graduate research effort written to fulfill the Magister of Technologiae in Chemical Engineering requirements at the University of South Africa. The research evaluates the ability of equilibrium based software to forecast dissolution, evaluate safety impacts, and determine downstream processability changes associated with using oxalic acid solutions to dissolve sludge heels in Savannah River Site High Level Waste (HLW) Tanks 1-15. First, a dissolution model is constructed and validated. Coupled with a model, a material balance determines the fate of hypothetical worst-case sludge in the treatment and neutralization tanks during each chemical adjustment. Although sludge is dissolved, after neutralization more is created within HLW. An energy balance determines overpressurization and overheating to be unlikely. Corrosion induced hydrogen may overwhelm the purge ventilation. Limiting the heel volume treated/acid added and processing the solids through vitrification is preferred and should not significantly increase the number of glass canisters.

KETUSKY, EDWARD

2005-10-31T23:59:59.000Z

202

Disposal Process for High Activity Sources by a University through the U.S. Dept. of Energy's Off-Site Source Recovery Project - 12076  

SciTech Connect

Sealed radioactive sources are used in a wide variety of applications by a large number of license holders in the Unites States. Applications range from low-activity calibration sources to high-activity irradiators for engineering, research, or medical purposes. This paper describes and evaluates the safety and security measures in place for disused sealed sources, in particular of high activity sealed sources at the end of their operational life-time. The technical, radiation protection, and financial challenges for licensees and the Competent Authorities are reviewed from the point of view of the license holder. As an example, the waste management processes and the chain of custody for disused research irradiator sources are followed from extraction from the irradiator facility to the source disposal or recycling contractor. Possible safety and security concern in the waste disposal process are investigated in order to identify improvement potential for radiation protection or source security. Two shipments of disused sealed sources from Colorado State University (CSU) have been conducted through the CSU Radiation Control Office (RCO) in the last two years, with a third shipment expected to be completed by the end of November 2011. Two of the sources shipped are considered 'high' activity and exceed the U.S. NRC limits requiring increased controls for security purposes. Three sources were shipped in 2009 and ten more are expected in 2011. A total activity of 117.3 GBq was shipped in 2009. Nine sources were recently shipped in October 2011 through a third party waste broker where the total activity was 96.34 GBq. The last source is scheduled for shipment no later than 30 November 2011 and contains an activity of 399.96 GBq. Radiation waste disposal of high activity sources in large shields with unknown manufacturers, serial numbers, or model numbers is an arduous process requiring multiple contacts with various state and federal agencies. DOE's OSRP has made it possible for CSU to dispose of older unused sources in an economically viable way. Disposal of multiple sources all at once was not an option prior to the establishment of the SCATR program. While CSU was able to dispose of sealed sources when funds were available, the cost to the University would have been prohibitive for this type of mass removal and disposal of radiation sources initiated within this initiative. Where we estimate a cost of about $130 k to ship these sources otherwise, CSU's contribution of $21 k realized a significant savings in what would have been an impossible disposal cost. Removing unused radiation sources from CSU has realized a cost savings while removing a potential security threat. (authors)

Abraham, James P. [Colorado State University Radiation Control Office, Department of Environmental Health Services, Fort Collins, CO. 80523-6021 (United States); Brandl, Alexander [Colorado State University, Department of Environmental and Radiological Health Sciences, Fort Collins CO. 80523-1618 (United States)

2012-07-01T23:59:59.000Z

203

Evaluating Solar Energy Sites | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the electric and heating loads at a site Size, condition, and efficiency of existing heating systems. After evaluation the site, the next step in the planning process is to...

204

Amended Record of Decision for the Savannah River Site Salt Processing Alternatives (DOE/EIS-0082-S2) (1/24/06)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 Federal Register 4 Federal Register / Vol. 71, No. 15 / Tuesday, January 24, 2006 / Notices (f) Quality of Evaluation Plan (Total 15 Points). (g) Budget (Total 8 Points). 2. Review and Selection Process: Tiebreaker for Development Grants. In tie-breaking situations for development grants described in 34 CFR 606.23(b), the HSI Program regulations require that we award one additional point to an application from an IHE that has an endowment fund for which the market value per FTE student is less than the comparable average per FTE student at a similar type of IHE. We also award one additional point to an application from an IHE that had expenditures for library materials per FTE student that are less than the comparable average per FTE student at a similar type IHE.

205

SEA GRANT PROGRAM SITE VISITS Sea Grant Program Webinar  

E-Print Network (OSTI)

SEA GRANT PROGRAM SITE VISITS Sea Grant Program Webinar May 2014 Sami J. Grimes, NSGO #12;OVERVIEW Sea Grant Evaluation Process Why Site Visits? Results from Previous Site Visit Cycle Overview of How Site Visits are Conducted Site Visit Terms Changes from the Previous Site Visit Cycle Sea Grant

206

DOE - Office of Legacy Management -- Monticello Mill Site - UT 03  

NLE Websites -- All DOE Office Websites (Extended Search)

Mill Site - UT 03 Mill Site - UT 03 FUSRAP Considered Sites Site: Monticello Mill Site (UT.03) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Monticello, Utah, Disposal and Processing Sites Documents Related to Monticello Mill Site Monticello Mill Tailings Site Operable Unit III Interim Remedial Action Progress Report July 1999-July 2000. GJO-2000-163-TAR. September 2000 U.S. Department of Energy at Grand Junction 2003 Annual Inspection Monticello, Utah November 2003 2005 Annual Inspection of the Monticello Mill Tailings (USDOE) and Monticello Radioactively Contaminated Properties Sites December 2005 Office

207

Electric Transmission Line Siting Compact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission Line Siting Compact Electric Transmission Line Siting Compact 1 ______________________________________________________________________________ 2 ARTICLE I 3 PURPOSE 4 5 Siting electric transmission lines across state borders and federal lands is an issue for states, the 6 federal government, transmission utilities, consumers, environmentalists, and other stakeholders. 7 The current, multi-year application review process by separate and equal jurisdictions constitutes 8 a sometimes inefficient and redundant process for transmission companies and complicates the 9 efforts of state and federal policy-makers and other stakeholders to develop more robust 10 economic opportunities, increase grid reliability and security, and ensure the consumers have the 11 lowest cost electricity possible. 12

208

Nevada National Security Site Industrial Sites Project Closeout - 12498  

SciTech Connect

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office is responsible for environmental restoration (ER) at the Nevada National Security Site (NNSS). This includes remediation at Industrial Sites where past nuclear testing activities and activities that supported nuclear testing may have or are known to have resulted in the release of contaminants into the environment. Industrial Sites at the NNSS have included nuclear facilities that supported the nuclear rocket/missile development programs, gas stations, landfills, spill sites, ordnance sites, and numerous other waste disposal and release sites. The NNSS Industrial Sites activities neared completion at the end of fiscal year 2011 while other activities required under the Federal Facility Agreement and Consent Order (FFACO) and part of the same NNSS ER Project are forecasted to extend to 2027 or beyond. With the majority of Industrial Sites corrective action units (CAUs) completed (more than 250 CAUs and over 1,800 corrective action sites), it was determined that an activity closeout process should be implemented to ensure that the work completed over the past 15 years is well documented in a comprehensive and concise summary. While the process used to close each individual CAU is described in approved documents, no single document describes in summary fashion the work completed to close the many individual Industrial Sites. The activity closeout process will be used to develop an Industrial Sites closeout document that describes these years of work. This document will summarize the number of Industrial Sites closed under the FFACO and provide general descriptions of projects, contaminants removed, and sites closed in place with corresponding Use Restrictions. Other pertinent information related to Industrial Sites work such as the project history, closure decisions, historical declarations, remediation strategies, and final CAU status will be included in the closeout document, along with a table listing each CAU and corresponding corrective action sites within each CAU. Using this process of conducting the activity closeout and developing a closeout document may prove useful for other ER projects within the DOE complex in describing how a long period of ER can be summarized in a single document. The NNSS Industrial Sites activities were completed over the span of 15 years and involved the investigation, cleanup or Use Restriction, and closure of more than 260 CAUs and over 1,800 sites. These activities will conclude in FY 2012 (with the exception of one CAU). In order to capture the work completed over this length of time and document decisions made during the activities, a closeout effort was initiated. The closeout will review the work conducted during the Industrial Sites activities and produce a single document that summarizes Industrial Sites activities. This closeout is being conducted at an interim stage in the overall NNSA/NSO ER Project since the Soils and UGTA activities will continue for a number of years, but the completion of the Industrial Sites project warrants conducting a closeout now while personnel are available and information is still current. The process followed by NNSA/NSO in conducing project closeout for the Industrial Sites portion of the ER program may prove useful within the DOE complex in demonstrating how a large ER project can be summarized. (authors)

Cabble, Kevin [U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, Las Vegas, Nevada 89193 (United States); Krauss, Mark [S.M. Stoller for Navarro-Intera, LLC, Las Vegas, Nevada 89193 (United States); Matthews, Pat [Navarro-Intera, LLC, Las Vegas, Nevada 8919 (United States)

2012-07-01T23:59:59.000Z

209

DOE - Office of Legacy Management -- Uravan Mill Site - CO 02  

Office of Legacy Management (LM)

Uravan Mill Site - CO 02 Uravan Mill Site - CO 02 FUSRAP Considered Sites Site: Uravan Mill Site (CO.02 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Naturita, Colorado, Processing Site Documents Related to Uravan Mill Site Data Validation Package for the July and October 2008 Water Sampling at the Naturita Processing and Disposal Sites Data Validation Report for the July 2009 Groundwater and Surface Water Sampling at the Naturita, Colorado, Processing Site; LMS/NAP/S00709; October 2009 2012 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites-Naturita, Colorado,

210

HANFORD SITE ASSETS AND ATTRIBUTES  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HANFORD SITE ASSETS AND ATTRIBUTES HANFORD SITE ASSETS AND ATTRIBUTES The Hanford Site provides the opportunity for long-term sustainable energy and industry development. The area boasts a specialized workforce that is highly educated and well-established; is rich in resources including land, infrastructure, low-cost energy, and available workforce; more scientists and engineers per capita than any other area in the Pacific Northwest; and is an optimum location for the development of sustainable energy solutions. Land The Hanford Site is one of the largest remaining land mega-sites available in the United States. * The 586-square-mile Hanford Site includes 39,000 acres designated for industrial use (9,000 acres for R&D). * The Comprehensive Land-Use Plan Environmental Impact Statement allows for a planning process

211

Hanford Site Safety Standards - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

and Rigging Manual DOE-RL-92-36, Hanford Site Hoisting and Rigging Manual Hanford Site LockoutTagout Procedure DOE-0336, Hanford Site LockoutTagout Procedure (PDF) Hanford...

212

SITE MAINTENANCE PLAN CSMRI SITE REMEDIATION  

E-Print Network (OSTI)

...............................................................................................................5 5.2 Ground and Surface Water MonitoringSITE MAINTENANCE PLAN CSMRI SITE REMEDIATION June 29, 2004 Prepared by: Colorado School of Mines .................................................................................................4 5.0 SITE AIR AND WATER MONITORING

213

Site locality identification study: Hanford Site. Volume II. Data cataloging  

SciTech Connect

Data compilation and cataloging for the candidate site locality identification study were conducted in order to provide a retrievable data cataloging system for the present siting study and future site evaluation and licensng processes. This task occurred concurrently with and also independently of other tasks of the candidate site locality identification study. Work in this task provided the data utilized primarily in the development and application of screening and ranking processes to identify candidate site localities on the Hanford Site. The overall approach included two steps: (1) data acquisition and screening; and (2) data compilation and cataloging. Data acquisition and screening formed the basis for preliminary review of data sources with respect to their probable utilization in the candidate site locality identification study and review with respect to the level of completeness and detail of the data. The important working assumption was that the data to be used in the study be based on existing and available published and unpublished literature. The data compilation and cataloging provided the basic product of the Task; a retrievable data cataloging system in the form of an annotated reference list and key word index and an index of compiled data. The annotated reference list and key word index are cross referenced and can be used to trace and retrieve the data sources utilized in the candidate site locality identification study.

Not Available

1980-07-01T23:59:59.000Z

214

Iodine-131 Releases from Radioactive Lanthanum Processing at the X-10 Site in Oak Ridge, Tennessee (1944-1956)- An Assessment of Quantities released, Off-Site Radiation Doses, and Potential Excess Risks of Thyroid Cancer- APPENDICES Appendices-Volume 1A  

SciTech Connect

This report consists of all the appendices for the report described below: In the early 1990s, concern about the Oak Ridge Reservation's past releases of contaminants to the environment prompted Tennessee's public health officials to pursue an in-depth study of potential off-site health effects at Oak Ridge. This study, the Oak Ridge dose reconstruction, was supported by an agreement between the U.S. Department of Energy (DOE) and the State of Tennessee, and was overseen by a 12-member panel appointed by Tennessee's Commissioner of Health. One of the major contaminants studied in the dose reconstruction was radioactive iodine, which was released to the air by X-10 (now called Oak Ridge National Laboratory) as it processed spent nuclear reactor fuel from 1944 through 1956. The process recovered radioactive lanthanum for use in weapons development. Iodine concentrates in the thyroid gland so health concerns include various diseases of the thyroid, such as thyroid cancer. The large report, ''Iodine-131 Releases from Radioactive Lanthanum Processing at the X-10 Site in Oak Ridge, Tennessee (1944-1956) - An Assessment of Quantities Released, Off-site Radiation Doses, and Potential Excess Risks of Thyroid Cancer,'' is in two volumes. Volume 1 is the main body of the report, and Volume 1A, which has the same title, consists of 22 supporting appendices. Together, these reports serve the following purposes: (1) describe the methodologies used to estimate the amount of iodine-131 (I-131) released; (2) evaluate I-131's pathway from air to vegetation to food to humans; (3) estimate doses received by human thyroids; (4) estimate excess risk of acquiring a thyroid cancer during ones lifetime; and (5) provide equations, examples of historical documents used, and tables of calculated values as appendices. Results indicate that females born in 1952 who consumed milk from a goat pastured a few miles east of X-10 received the highest doses from I-131 and would have had the highest risks of contracting thyroid cancer. Doses from cow's milk are considerably less. Detailed dose and risk estimates, and associated uncertainties, for other contaminants studied in the Oak Ridge dose reconstruction are presented in several other technical reports. One way to easily locate them in OSTI's Information Bridge is by searching the ''report number field'' for the number DOE/OR/21981*. Be sure to place the asterisk after the base number so your search can list the complete series of reports related to Oak Ridge Dose Reconstruction.

Apostoaei, A.I.; Burns, R.E.; Hoffman, F.O.; Ijaz, T.; Lewis, C.J.; Nair, S.K.; Widner, T.E.

1999-07-01T23:59:59.000Z

215

Division Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Carbon Dioxide Reduction Catalysts Carbon Dioxide Reduction Catalysts Our research program is directed toward developing and understanding metal complexes that catalyze reactions relevant to renewable energy, particularly those that reduce carbon dioxide to fuels or fuel precursors. Carbon dioxide reduction catalysts are important targets because they could enable "recycling" of hydrocarbon fuels, thus lowering their carbon footprint. Our research addresses two key challenges in this area. First, we aim to improve the lifetimes, activity, and selectivity of homogeneous catalysts by incorporating them into porous heterogeneous frameworks derived from structurally persistent organic polymers. These frameworks allow isolation of the catalytic centers, which inhibits reaction pathways that lead to catalyst decomposition, and enable the spatially controlled deployment of ancillary functional groups that bind and concentrate substrate near the active site and/or assist with its activation. Second, we are developing homogeneous dual-catalyst systems and assemblies that couple CO2 reduction catalysis to a parallel catalytic reaction that provides the reducing equivalents. We are especially interested in proton-coupled electron-transfer reactions involving activation of H2 and of organic dehydrogenation substrates, wherein the proton pathway also participates in the conversion of CO2 to CO. In both of these research thrusts we are studying catalysts that may be activated under thermal, electrochemical, or photochemical conditions.

216

Hanford Site Wide Programs - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Decrease Font Size Hanford Site Wide Programs Hanford Safety Hanford Site Wide Programs Hanford Fire Department Health & Safety Exposition Hanford Traffic Safety Hanford...

217

Site Map  

NLE Websites -- All DOE Office Websites (Extended Search)

Links. Links. Collapse Southwestern Power Administration Southwestern Power Administration Collapse About the Agency About the Agency Home Contact us Diversity Employment FOIA/Privacy Act Publications Collapse Doing Business with Southwestern Doing Business with Southwestern Becoming a Vendor Items SWPA Buys Payment To Vendors Small Business SWPA Property Disposal Collapse Scheduling and Operations Scheduling and Operations Generation Schedules Interconnections Hydropower Conference Power Operations Training Center Collapse Rates and Repayment Rates and Repayment Rate Schedules Rate Notices Repayment Process Open Access Tariff Collapse Environment , Safety and Security Environment , Safety and Security Crime Witness Program Environment Right-of-Way Safety Security Last Updated: September 16, 2009

218

Photo Gallery - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

PFP Glovebox Separation PFP Glovebox Separation PFP Glovebox Separation Processing sludge Processing sludge Processing sludge Processing sludge Processing sludge Processing...

219

Site Map | DOEpatents  

Office of Scientific and Technical Information (OSTI)

Site Map Site Map Home Basic Search Advanced Search DOEpatents FAQ About DOEpatents Site Map Contact Us Website PoliciesImportant Links...

220

Site Monitoring Area Maps  

NLE Websites -- All DOE Office Websites (Extended Search)

to the Site Monitoring Area (SMA) The Site Monitoring Area sampler Control measures (best management practices) installed at the Site Monitoring Area Structures such as...

Note: This page contains sample records for the topic "rifle processing site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

PNNL: Site index  

NLE Websites -- All DOE Office Websites (Extended Search)

Site Index Site Index # A B C D E F G H I J K L M N O P Q R S T U V W X Y Z # # 3-D Body Holographic Scanner # A B C D E F G H I J K L M N O P Q R S T U V W X Y Z A Alerts - PNNL Staff Information Applied Geology and Geochemistry Applied Process Engineering Laboratory Asymmetric Resilient Cybersecurity (External website) Atmospheric Radiation Measurement (ARM) Program Atmospheric Sciences & Global Change Division Available Technologies Awards Awards - Science and Engineering External Recognition (SEER) Program # A B C D E F G H I J K L M N O P Q R S T U V W X Y Z B Battelle Corporate Contributions Battelle Memorial Institute Battelle Offices (addresses) Benefits (Insurance Forms, Savings Plan) Bio-Based Product Research at PNNL Biological & Environmental Research-Proteomics

222

Technology Transfer: Site Map  

NLE Websites -- All DOE Office Websites (Extended Search)

Site Map Site Map About Us About Technology Transfer Contact Us Available Technologies Advanced Materials Biofuels Biotechnology and Medicine Developing World Energy Environmental Technologies Imaging and Lasers Ion Sources and Beam Technologies Nanotechnology and Microtechnology Software and Information Technology For Industry Licensing Overview Frequently Asked Questions Partnering with Berkeley Lab Licensing Interest Form Receive New Tech Alerts For Researchers What You Need to Know and Do The Tech Transfer Process Forms Record of Invention (Word doc -- please do not use earlier PDF version of the form) Software Disclosure and Abstract (PDF, use Adobe Acrobat or Adobe Reader 9 and up ONLY to complete the form) Policies Conflict of Interest Outside Empolyment Export Control FAQs for Researchers

223

Planning for Academic Program Review Site Visits  

E-Print Network (OSTI)

Planning for Academic Program Review Site Visits 2013-2014 #12;Introduction o Purpose of this meeting: · Help academic units under review this year to plan for their site visit o Outline for today: · Planning your site visit · Graduate and Professional Student Senate (GPSS) role · Review process timeline

Van Volkenburgh, Elizabeth

224

Chapter 3: Building Siting  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

: Building Siting : Building Siting Site Issues at LANL Site Inventory and Analysis Site Design Transportation and Parking LANL | Chapter 3 Site Issues at LANL Definitions and related documents Building Siting Laboratory site-wide issues include transportation and travel distances for building occupants, impacts on wildlife corridors and hydrology, and energy supply and distribution limitations. Decisions made during site selec- tion and planning impact the surrounding natural habitat, architectural design integration, building energy con- sumption, occupant comfort, and occupant productivity. Significant opportunities for creating greener facilities arise during the site selection and site planning stages of design. Because LANL development zones are pre- determined, identify the various factors affecting devel-

225

MIDC: Web Site Search  

NLE Websites -- All DOE Office Websites (Extended Search)

MIDC Web Site Search Enter words or phrases: Search Clear Help Also see the site directory. NREL MIDC...

226

Hanford Site Freedom  

NLE Websites -- All DOE Office Websites (Extended Search)

2007; 3. Radionuclide Air Emissions Report for the Hanford Site, Calendar Year 2008; 4. Radionuclide Air Emissions Report for the Hanford Site, Calendar Year 2010. (The 2009...

227

National Ignition Facility Project Site Safety Program  

SciTech Connect

This Safety Program for the National Ignition Facility (NIF) presents safety protocols and requirements that management and workers shall follow to assure a safe and healthful work environment during activities performed on the NIF Project site. The NIF Project Site Safety Program (NPSSP) requires that activities at the NIF Project site be performed in accordance with the ''LLNL ES&H Manual'' and the augmented set of controls and processes described in this NIF Project Site Safety Program. Specifically, this document: (1) Defines the fundamental NIF site safety philosophy. (2) Defines the areas covered by this safety program (see Appendix B). (3) Identifies management roles and responsibilities. (4) Defines core safety management processes. (5) Identifies NIF site-specific safety requirements. This NPSSP sets forth the responsibilities, requirements, rules, policies, and regulations for workers involved in work activities performed on the NIF Project site. Workers are required to implement measures to create a universal awareness that promotes safe practice at the work site and will achieve NIF management objectives in preventing accidents and illnesses. ES&H requirements are consistent with the ''LLNL ES&H Manual''. This NPSSP and implementing procedures (e.g., Management Walkabout, special work procedures, etc.,) are a comprehensive safety program that applies to NIF workers on the NIF Project site. The NIF Project site includes the B581/B681 site and support areas shown in Appendix B.

Dun, C

2003-09-30T23:59:59.000Z

228

Independent Oversight Review, Savannah River Site - September 2011 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site - September 2011 Savannah River Site - September 2011 Independent Oversight Review, Savannah River Site - September 2011 September 2011 Review of the Implementation Verification Review Processes at the Savannah River Site Environmental Management Nuclear Facilities The Office of Enforcement and Oversight (Independent Oversight) within the Office of Health, Safety and Security (HSS), conducted an independent review of the Implementation Verification Review (IVR) Processes at Savannah River Site Environmental Management Nuclear Facilities. The overall objective of the Independent Oversight IVR review process includes verification that contractors and site offices have developed and implemented appropriate methods for performing IVRs (including direction for scheduling and conducting IVR activities) and measurement of the

229

Hanford Site Solid Waste Acceptance Program - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

About Us > Hanford Site Wide Programs > Hanford Site Solid Waste Acceptance Program About Us Hanford Overview and History Hanford Cleanup Hanford Site Wide Programs Hanford Site...

230

Top Three Topics and Achievements by Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chairs' Meeting Chairs' Meeting October 20, 2011 Paducah Fully support the DOE Asset Revitalization Initiative Incorporate clean energy technologies at the Paducah site - solar, bio-fuels, clean coal, etc. Develop infrastructure assets at the site including electrical grid Develop infrastructure assets at the site including electrical grid Promote public-private partnerships such as USEC for commercial opportunities at site Local communities and stakeholders are engaged and ready to support this process! Paducah Continue to support the reuse of assets at the facility Re-enrichment of Uranium Tails at the site Reduces waste for processing & disposition Generates revenue for DOE Extends jobs at USEC Develop strategy to reuse contaminated nickel Reduces waste for processing & disposition

231

Site Map | ScienceCinema  

Office of Scientific and Technical Information (OSTI)

Site Map Site Map Home Audio Search Fielded Search About Help Site Map Contact Us Website PoliciesImportant Links...

232

PHP SCILAB | .. | 1 (Web Site) Web Site ,  

E-Print Network (OSTI)

PHP SCILAB | .. | 1 Chapter 1 , (Web Site) Web Site , (World Wide Web) : http://school.obec.go.th/borkruwitt/inter/internet01.gif HTML PHP,JavaScript,ASP PHP SCILAB AppServ PHP http://www.appservnetwork.com #12; PHP SCILAB | .. | 2 1. 2. Next 3. I

Kovintavewat, Piya

233

2007 Annual Site Environmental Report  

NLE Websites -- All DOE Office Websites (Extended Search)

2007 Annual Site Environmental Report 2007 Annual Site Environmental Report October 2008 U.S. Department of Energy National Energy Technology Laboratory Albany, Oregon Fairbanks, Alaska Morgantown, West Virginia Pittsburgh, Pennsylvania Tulsa, Oklahoma NETL Customer Service Line: (800) 553-7681 www.netl.doe.gov NETL's Annual Site Environmental Report for 2007 ii Disclaimer This report was prepared as an account of work sponsored by an agency of the U.S. Government. Neither the U.S. Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately-

234

DNAPL site evaluation. Research report  

SciTech Connect

Dense nonaqueous-phase liquids (DNAPLs), especially chlorinated solvents, are among the most prevalent subsurface contaminants identified in ground-water supplies and at waste disposal sites. There are several site-characterization issues specific to DNAPL sites including: (a) the risk of inducing DNAPL migration by drilling, pumping or other field activities; (b) the use of special sampling and measurement methods to assess DNAPL presence and migration potential; and (c) development of a cost-effective characterization strategy that accounts for DNAPL chemical transport processes, the risk of inducing DNAPL movement during field work, and the data required to select and implement a realistic remedy. The manual provides information to address these issues and describes and evaluates activities that can be used to determine the presence, fate and transport of subsurface DNAPL contamination.

Cohen, R.M.; Mercer, J.W.

1993-02-01T23:59:59.000Z

235

Protocol, Site Leads - May 2011 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site Leads - May 2011 Site Leads - May 2011 Protocol, Site Leads - May 2011 May 2011 Protocol for Site Leads The purpose of this protocol is to establish the requirements and responsibilities for the Office of Safety and Emergency Management Evaluations Site Leads. The Site Lead's primary responsibility is to perform independent safety oversight at their assigned site(s). Site Leads are assigned to Department of Energy (DOE) sites with nuclear facilities to maintain operational awareness, establish and implement a prioritized set of oversight activities focused on high hazard nuclear facilities and tailored to site conditions, activities and issues. Protocol, Site Leads - May 2011 More Documents & Publications Appraisal Process Protocols, Independent Oversight - November 2012

236

Protocol, Site Leads - May 2011 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Protocol, Site Leads - May 2011 Protocol, Site Leads - May 2011 Protocol, Site Leads - May 2011 May 2011 Protocol for Site Leads The purpose of this protocol is to establish the requirements and responsibilities for the Office of Safety and Emergency Management Evaluations Site Leads. The Site Lead's primary responsibility is to perform independent safety oversight at their assigned site(s). Site Leads are assigned to Department of Energy (DOE) sites with nuclear facilities to maintain operational awareness, establish and implement a prioritized set of oversight activities focused on high hazard nuclear facilities and tailored to site conditions, activities and issues. Protocol, Site Leads - May 2011 More Documents & Publications Appraisal Process Protocols, Independent Oversight - November 2012

237

U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checklist  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-10 2-10 U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checklist Project/Activity: Install wells and boreholes at the Old Rifle, CO, Processing Site A. Brief Project/Activity Description The Environmental Remediation Sciences Program (ERSP) proposes to install 36 wells and 5 boreholes on the Old Rifle, CO, Processing Site. A combination of 13 injection wells, 18 monitoring wells, 5 multi-chambered wells, and 5 boreholes would be installed using a sonic rotary drill rig. Five of the wells would be used for U.S. Department of Energy (DOE) Office of Legacy Management (LM) groundwater monitoring purposes and the remainder (31 wells and 5 boreholes) would be installed in a single gallery (Super 8) to be used for research and monitoring

238

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11 - 320 of 28,905 results. 11 - 320 of 28,905 results. Download CX-000316: Categorical Exclusion Determination Massachusetts Revision 1 - High Performance Buildings Program CX(s) Applied: B1.15, B1.22, B1.23, B1.31, B2.1, B2.3, B2.5, A1, A9, A11, B1.3, B1.4, B1.5, B1.7, B5.1 Date: 11/19/2009 Location(s): Massachusetts Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory http://energy.gov/nepa/downloads/cx-000316-categorical-exclusion-determination Download Analysis and Geochemical Modeling of Vanadium Contamination in Groundwater New Rifle Processing Site, Colorado Analysis and Geochemical Modeling of Vanadium Contamination in Groundwater New Rifle Processing Site, Colorado http://energy.gov/lm/downloads/analysis-and-geochemical-modeling-vanadium-contamination-groundwater

239

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

091 - 8100 of 26,764 results. 091 - 8100 of 26,764 results. Download Analysis and Geochemical Modeling of Vanadium Contamination in Groundwater New Rifle Processing Site, Colorado Analysis and Geochemical Modeling of Vanadium Contamination in Groundwater New Rifle Processing Site, Colorado http://energy.gov/lm/downloads/analysis-and-geochemical-modeling-vanadium-contamination-groundwater Download Proposed rule: re-opening of public comment period Proposed rule: re-opening of public comment period. The U.S. Department of Energy (DOE) is re-opening the public comment period for proposed amendments to its regulations governing compliance with... http://energy.gov/nepa/downloads/proposed-rule-re-opening-public-comment-period Download Semiannual Report to Congress: October 1, 2010- March 31, 2011

240

Photo Gallery - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Using Recovery Act funding, contractors are cleaning up dozens of waste sites. In this photo from October 2009, workers continue to excavate soil from the 100-UPR-K-1 waste site,...

Note: This page contains sample records for the topic "rifle processing site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Photo Gallery - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

truck, trucks, waste site, BC, BC Control Area Area: BC Control Area Description: This photo shows the BC Control Area of the Hanford Site before remediation began. The area is...

242

Photo Gallery - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

site H Reactor Hanford High School Hanford Site Historic Historical Building Historical Photo IC ISS Long-Term Stewardship LTS metal debris military Mt. Rainier N Reactor N-Area...

243

ORNL Site Ofice  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ORNL Site Ofice ORNL Site Ofice P.O. Box 2008 Oak Ridge, Tennessee 37831-6269 January 28, 2013 MEMORANDUM FOR GREGORY H. WOODS GENERAL COUNSEL GC-1 FROM: SUBJECT: ��MK = MOORE, MANAGER lF �NL SITE OFFICE ANNUAL NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) PLANNING SUMMARY FOR 2013- OAK RIDGE NATIONAL LABORATORY (ORNL) SITE OFFICE (OSO) This correspondence transmits the Annual NEPA Planning Summary for 2013 for OSO.

244

Fire Protection Related Sites  

Energy.gov (U.S. Department of Energy (DOE))

Fire Protection related sites for Department of Energy, Non-DOE Government and Non-Government information.

245

Photo Gallery - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Bluffs Landslide Popular Keywords: Archeological Excavation archeological excavation burn pit landfill old Hanford town site > Archeological Excavation Archeological...

246

Completed Sites Listing  

Energy.gov (U.S. Department of Energy (DOE))

As of fiscal year 2012, EM (and its predecessor organization UMTRA) completed cleanup and closed 90 sites in 24 states.

247

E-Print Network 3.0 - abandoned mining sites Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

processed and interpreted geophysical data at four separate sites... in Chiang Mai, Thailand. These field sites were selected to train participants in the ... Source:...

248

E-Print Network 3.0 - approach preliminary site Sample Search...  

NLE Websites -- All DOE Office Websites (Extended Search)

Reserve Site Selection Criteria and Process Summary: Estuary) were included in the Corpus Christi Bay National Estuary Program study area. Preliminary Site... of the full suite of...

249

Independent Oversight, Nevada National Security Site - March 2012 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oversight, Nevada National Security Site - March 2012 Oversight, Nevada National Security Site - March 2012 Independent Oversight, Nevada National Security Site - March 2012 March 2012 Review of the Nevada National Security Site Implementation Verification Review Processes This report documents the independent review of implementation verification review (IVR) processes at the Nevada National Security Site (NNSS) conducted by the Office of Enforcement and Oversight (Independent Oversight), which is within the Office of Health, Safety and Security (HSS). The review was performed by the HSS Office of Safety and Emergency Management Evaluations from February 6 to 15, 2012. Independent Oversight, Nevada National Security Site - March 2012 More Documents & Publications CRAD, Implementation Verification Review - July 20, 2011

250

Top Topics and Achievements by Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Topics and Topics and Accomplishments EM Site-Specific Advisory Board EM Site-Specific Advisory Board Chairs' Meeting October 2-3, 2012 Savannah River  Issue: Salt Waste Processing Facility  CAB understands some schedule and funding issues may be brewing.  DOE has internal assessment underway.  Delays could have dramatic impact on overall Site Closure schedule and Process.  While this is early in process we do have concerns. Savannah River  Issue (April 2012): Receipt of Research Reactor Spent Nuclear Fuel and Long Term Storage of Existing Inventories with no known, approved disposition path  Processing of SNF In H-Canyon was once considered viable.  SNF processing in H-Canyon seems to no longer be the preferred

251

DOE Site List  

Office of Environmental Management (EM)

Links Links Central Internet Database CID Photo Banner DOE Site List Site Geo Site Code State Operations Office1 DOE Programs Generating Streams at Site DOE Programs Managing Facilities Associated Data2 Acid/Pueblo Canyons ACPC NM Oak Ridge Waste/Media, Facilities Airport Substation CA Western Area Power Administration Facilities Akron Hill Communication Site CO Western Area Power Administration Facilities Akron Substation CO Western Area Power Administration Facilities AL Complex NM Albuquerque DP Facilities Alba Craft ALCL OH Oak Ridge Facilities Albany Research Center AMRC OR Oak Ridge Facilities Alcova Switchyard WY Western Area Power Administration Facilities Aliquippa Forge ALFO PA Oak Ridge Facilities

252

DOE - Office of Legacy Management -- Naturita Mill Site - CO 0-08  

Office of Legacy Management (LM)

Naturita Mill Site - CO 0-08 Naturita Mill Site - CO 0-08 FUSRAP Considered Sites Site: Naturita Mill Site (CO.0-08) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Naturita, Colorado, Processing Site Documents Related to Naturita Mill Site Data Validation Package for the July and October 2008 Water Sampling at the Naturita Processing and Disposal Sites Data Validation Report for the July 2009 Groundwater and Surface Water Sampling at the Naturita, Colorado, Processing Site; LMS/NAP/S00709; October 2009 2012 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites-Naturita, Colorado,

253

Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Sites at Slick Rock, Colorado: Appendix B to Attachment 3, Lithologic logs and monitor well construction information. Final report  

SciTech Connect

This volume contains lithology logs and monitor well construction information for: NC processing site; UC processing site; and Burro Canyon disposal site. This information pertains to the ground water hydrology investigations which is attachment 3 of this series of reports.

NONE

1995-09-01T23:59:59.000Z

254

We Know the AFC Process  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

California Energy Commission Process DATA ADEQUACY *AFC Submitted *Adequacy Review EVENTS AFC ACCEPTED DISCOVERY *Informational HearingSite Visit *Data RequestResponse *Public...

255

Rocky Flats, Colorado, Site Quarterly Report of Site Surveillance...  

Office of Legacy Management (LM)

Site. LM provides periodic communications through several means, such as this report, web-based tools, and public meetings. LM prepared the Rocky Flats, Colorado, Site Site...

256

Rocky Flats, Colorado, Site Quarterly Report of Site Surveillance  

Office of Legacy Management (LM)

Site. LM provides periodic communications through several means, such as this report, web-based tools, and public meetings. LM prepared the Rocky Flats, Colorado, Site Site...

257

DOE - Office of Legacy Management -- Gunnison Mill Site - CO 0-06  

Office of Legacy Management (LM)

Gunnison Mill Site - CO 0-06 Gunnison Mill Site - CO 0-06 FUSRAP Considered Sites Site: Gunnison Mill Site (CO.0-06 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Gunnison, Colorado, Processing Site Documents Related to Gunnison Mill Site Verification Montioring Report for the Gunnison, Colorado, Processing Site, September 2007. 2011 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites-Gunnison, Colorado, Disposal Site. LMS/S08056. January 2012 U.S. Department of Energy 2009 UMTRCA Title I Annual Report January 2010 Gunnison, Colorado Page 8-1 8.0 Gunnison, Colorado, Disposal Site

258

Hanford Site Workers Meet Challenging Performance Goal at Plutonium...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hanford site's Plutonium Finishing Plant are surpassing goals for removing hazardous tanks once used in the plutonium production process. EM's Richland Operations Office and...

259

Site Visit Report, Lawrence Livermore National Laboratory - May...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Laboratory - May 2010 May 2010 Review of Lawrence Livermore National Laboratory Fire Protection Design Review Process This site visit report documents the results of the...

260

NETL: Site Environmental Quality  

NLE Websites -- All DOE Office Websites (Extended Search)

Site Environmental Quality Site Environmental Quality About NETL Site Environmental Quality - Certified to ISO 14001:2004 Questions about NETL's Environment, Safety and Health Management System may be directed to Michael Monahan, 304-285-4408, michael.monahan@netl.doe.gov. NETL has implemented an Environment, Safety and Health (ES&H) Management System, based on DOE's Integrated Safety Management System, the International Organization for Standardization (ISO) 14000 series, and the Occupational Health and Safety Assessment (OHSAS) 18000 series. While the original scope of the ES&H Management System included the Morgantown and Pittsburgh sites, in fiscal year 2010, the Albany site was incorporated into the existing ES&H Management System. In addition, all three sites underwent ISO 14001:2004 recertification audits and Morgantown and

Note: This page contains sample records for the topic "rifle processing site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

WCI | Site 300 CORS  

NLE Websites -- All DOE Office Websites (Extended Search)

: CORS : CORS Weather Site Access Contained Firing Facility (CFF) Continuosly Operating Reference Station (CORS) CORS logo How to access GPS satellite data The National Geodetic Survey(NGS) Home Page for the S300 CORS base station is: http://www.ngs.noaa.gov/CORS/ Type S300 into "enter SiteID" To get user-friendly data: http://www.ngs.noaa.gov/UFCORS/ The GPS data will be in "receiver independent exchange" (RINEX) format, version 2.10. CORS Proxy Data Availability Details: NGS Reference Position Information Site 300 CORS Reference Position RTK Transmission Frequency NGS s300 Site Log NGS s300 Site Map Links to other GPS sites Last modified: July 27, 2011 UCRL-MI-134143 | Privacy & Legal Notice Contact: wci-webteam@llnl.gov NNSA Logo DOE Logo

262

MONTICELLO NPL SITES  

Office of Legacy Management (LM)

.. ' \ MONTICELLO NPL SITES FFA QUARTERLY REPORT: October 1 -December 31, 2008 DOE Site Manager: Jalena Dayvault JR 7CJ7 This report summarizes current project status and activities implemented during October tiU'ough December 2008, and provides a schedule of planned near term activities for the Monticello MIII Tailings Site (MMTS) and the Monticello Vicinity Properties (MVP) NPL sites. This report also includes repository and Pond 4 leachate collection data, quarterly site inspection repmis, site meteorological data, and monitoring summary for tlw ex situ ground water treatment system. 1.0 MMTS Activities/Status Repository and Pond 4 · * Monthly and quarterly inspection of the repository identified no abnormalities (see attached repmis). .

263

ColumbusSites.cdr  

Office of Legacy Management (LM)

Columbus, Ohio, Sites consist of two geographically Columbus, Ohio, Sites consist of two geographically separate properties owned by the Battelle Memorial Institute: the King Avenue site, located in the city of Columbus, and the West Jefferson site, located approx- imately 15 miles west of Columbus. Battelle conducted extensive nuclear research at both locations for the U.S. Department of Energy (DOE) and its predecessor agencies between 1943 and 1986. The research resulted in contamination of soil, buildings, and equipment with radioactive and mixed waste materials. Environmental cleanup of the sites began in 1986. The 6-acre King Avenue site, which was historically a part of the federal government's fuel and target fab- rication program, consisted of 9 buildings and the surrounding grounds. Nuclear research conducted at the

264

SRNS-RP-2013-00005 Savannah River Site Ten Year Site Plan FY  

NLE Websites -- All DOE Office Websites (Extended Search)

SRNS-RP-2013-00005 SRNS-RP-2013-00005 Savannah River Site Ten Year Site Plan FY 2014 - 2023 May 2013 United States Department of Energy Savannah River Site Ten Year Site Plan FY 2014 - 2023 May 2013 Prepared by: Savannah River Nuclear Solutions, LLC A Fluor Daniel Partnership Savannah River Site Aiken, SC 29808 SRNS-RP-2013-00005 Savannah River Site Ten Year Site Plan SRNS-RP-2013-00005 May 2013 DISCLAIMER This report was prepared by Savannah River Nuclear Solutions LLC (SRNS) for the United States Department of Energy under Contract No. DE-AC09-08SR22470 and is an account of work performed under that contract. Reference herein to any specific commercial product, process or services by trademark, name, manufacturer, or otherwise does not necessarily constitute or imply endorsement,

265

Site Map - EERE Commercialization Office  

NLE Websites -- All DOE Office Websites (Extended Search)

Site Map Site Map Printable Version Share this resource Quick Links Energy Innovation Portal Site Map Commercialization Home Page About Success Stories Legacy Initiatives Small...

266

Site Map | DOE Data Explorer  

Office of Scientific and Technical Information (OSTI)

Site Map Site Map Home Basic Search Advanced Search DDE FAQ About DDE Site Map Data ID Service Contact Us Website PoliciesImportant Links...

267

Hanford Cleanup - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Cleanup About Us Hanford Overview and History Hanford Cleanup Hanford Site Wide Programs Hanford Cleanup Email Email Page | Print Print Page |Text Increase Font Size Decrease Font...

268

Ecological Monitoring - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

support of the National Environmental Protection Act, Endangered Species Act, Migratory Bird Treaty Act, and other laws and regulations. Management Plans Hanford Site Revegetation...

269

Maintaining STAR - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

VPP Hanford Site Champions Committee Getting Started Maintaining STAR VPP CampaignPosters VPP Tools VPP Presentations VPP Awareness VPP Communications VPP Conferences...

270

Disposal Information - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Email Page | Print Print Page |Text Increase Font Size Decrease Font Size Disposal of Radioactive Waste at Hanford The Hanford Site operates lined, RCRA Subtitle C land...

271

Photo Gallery - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

soil generated by ARRA-funded cleanup projects across the Hanford Site. In this photo, additional containers needed to haul waste are delivered by Rule Steel to the...

272

Photo Gallery - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Using Recovery Act funding, contractors are cleaning up dozens of waste sites. In this photo, a Bell 412 helicopter outfitted with radiation detection equipment flies over a large...

273

1999 Site Environmental Report  

SciTech Connect

The Site Environmental Report for Brookhaven National Laboratory for the calendar year 1999, as required by DOE Order 231.1.

NONE

2000-09-01T23:59:59.000Z

274

Contact Us - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Hanford Feedback Hanford RSS Blogger DOE Office of River Protection Hanford @ Social Media Tank Waste and Construction of the Vitrification Plant Hanford Site Facebook Hanford...

275

Photo Gallery - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

a cover from a waste container used to haul waste to the Hanford Site's engineered landfill, the Environmental Restoration Disposal Facility. Nearly 100 of the first 400 workers...

276

Weather Charts - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Station Real Time Met Data from Around the Site Current HMS Observations Daily HMS Extremes in Met Data Met and Climate Data Summary Products Historical Weather Charts Contacts...

277

Seasonal Precipitation - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Station Real Time Met Data from Around the Site Current HMS Observations Daily HMS Extremes in Met Data Met and Climate Data Summary Products Historical Weather Charts Contacts...

278

Contacts / Hours - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Station Real Time Met Data from Around the Site Current HMS Observations Daily HMS Extremes in Met Data Met and Climate Data Summary Products Contacts Hours Current NWS...

279

Categorical Exclusion Determinations: B1.3 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 24, 2011 June 24, 2011 CX-006223: Categorical Exclusion Determination Routine and Proposed Actions at the New and Old Rifle, Colorado, Former Processing Sites and at the Rifle, Colorado, Disposal Site LM 22-11 CX(s) Applied: B1.3, B1.24, B3.1, B3.6 Date: 06/24/2011 Location(s): Rifle, Colorado Office(s): Legacy Management June 24, 2011 CX-006222: Categorical Exclusion Determination Non Comprehensive Environmental Response, Compensation, and Liability Act Permit Related, General Site Actions, and Non-Routine Actions at the Rocky Flats Site, Colorado, LM 18 - 11 CX(s) Applied: B1.3, B1.11, B1.12, B1.24, B3.3 Date: 06/24/2011 Location(s): Jefferson County, Colorado Office(s): Legacy Management June 24, 2011 CX-006221: Categorical Exclusion Determination Routine Monitoring, Maintenance, the Installation of Two Wells and General

280

DOE - Office of Legacy Management -- Slick Rock Mill Site - CO 08  

NLE Websites -- All DOE Office Websites (Extended Search)

Slick Rock Mill Site - CO 08 Slick Rock Mill Site - CO 08 FUSRAP Considered Sites Site: Slick Rock Mill Site (CO.08) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Slick Rock, Colorado, Processing Site Documents Related to Slick Rock Mill Site 2012 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites-Slick Rock, Colorado, Disposal Site. LMS/S09461. February 2013 Verification Monitoring Report for the Slick Rock, Colorado, Processing Sites, 2007 Update June 2008 Office of Legacy Management DOE M/1577 2008 - -L Work Performed Under DOE Contract No. for the U.S.

Note: This page contains sample records for the topic "rifle processing site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Untitled Page -- Other Sites Summary  

Office of Legacy Management (LM)

Other Sites Summary Other Sites Summary Search Other Sites Considered Sites Other Sites All LM Quick Search All Other Sites 11 E (2) Disposal Cell - 037 ANC Gas Hills Site - 040 Argonne National Laboratory - West - 014 Bodo Canyon Cell - 006 Burro Canyon Disposal Cell - 007 Cheney Disposal Cell - 008 Chevron Panna Maria Site - 030 Clive Disposal Cell - 036 Commercial (Burial) Disposal Site Maxey Flats Disposal Site - KY 02 Conoco Conquista Site - 031 Cotter Canon City Site - 009 Dawn Ford Site - 038 EFB White Mesa Site - 033 Energy Technology Engineering Center - 044 Estes Gulch Disposal Cell - 010 Exxon Ray Point Site - 032 Fermi National Accelerator Laboratory - 016 Fernald Environmental Management Project - 027 Fort St Vrain - 011 Geothermal Test Facility - 001 Hecla Durita Site - 012

282

Hanford ARRA Photogallery - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

remediation Waste Site Sampling Waste Site Sampling 100 K Pipeline 100 K Pipeline F Area Walk Down F Area Walk Down 100 K Waste Sites 100 K Waste Sites BC Control Area Remediation...

283

Hanford ARRA Photogallery - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

waste site Waste Site Sampling Waste Site Sampling 100 K Pipeline 100 K Pipeline Multi-Incremental Sampling Project Multi-Incremental Sampling Project 100 K Waste Sites 100 K Waste...

284

Site Energy Reduction Program  

E-Print Network (OSTI)

DuPonts Sabine River Works site is the largest energy consuming location within DuPont. In the year 2000, each production area was encouraged to reduce energy costs. By 2003 site energy consumption was down 16% on an absolute basis and 12% on a BTU...

Jagen, P. R.

2007-01-01T23:59:59.000Z

285

Protein active sites, interaction  

E-Print Network (OSTI)

for active site identification ! Manual MSA and structure analysis ! Catalytic Site Atlas (homology-based) ! Evolutionary Trace (MSA subfamily- and family-wide conservation; phylogenetic tree and structure analysis) ! 3D", Bartlett et al. J Mol Biol. 2002 Nov 15;324(1):105-21. · "An evolutionary trace method defines binding

Sjölander, Kimmen

286

Savannah River Site's Site Specific Plan  

SciTech Connect

This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show the Environmental Restoration and Waste Management activities that were identified during the preparation of the Department of Energy-Headquarters (DOE-HQ) Environmental Restoration and Waste Management Five-Year Plan (FYP) for FY 1992--1996. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. The purpose of the SSP is to develop a baseline for policy, budget, and schedules for the DOE Environmental Restoration and Waste Management activities. The plan explains accomplishments since the Fiscal Year (FY) 1990 plan, demonstrates how present and future activities are prioritized, identifies currently funded activities and activities that are planned to be funded in the upcoming fiscal year, and describes future activities that SRS is considering.

Not Available

1991-08-01T23:59:59.000Z

287

MONTICELLO NPL SITES  

Office of Legacy Management (LM)

April 1 - June 30, 2008 April 1 - June 30, 2008 DOE Site Manager: Jalena Maestas This report summarizes current project status, activities implemented during April through June 2008, and provides a schedule of planned near term activities, for the Monticello Mill Tailings Site (MMTS) and the Monticello Vicinity Properties (MVP) NPL sites. This report also includes repository and Pond 4 leachate collection data, quarterly site inspection results, and site meteorological monitoring data. 1.0 MMTS Activities/Status Repository and Pond 4 * Monthly and quarterly inspection of the repository identified no abnormalities. * Shrub seedlings planted last fall had a poor survival rate. * New damage to shrubs and vole infestation is not evident. * Monthly inspection of Pond 4 identified no abnormalities.

288

Related Data Sites  

NLE Websites -- All DOE Office Websites (Extended Search)

Related Data Sites Related Data Sites CDIAC has listed the following Web sites because these sites offer high-quality data sets (not available through CDIAC) from a variety of global-change themes. These links will take you outside of CDIAC, therefore, we are not responsible for the content or intent of these outside links. This list is not intended to be comprehensive, but we do hope you find it useful if you cannot find what you are looking for here at CDIAC. Multi-Agency Sites Global Change Data and Information System (GCDIS) GCDIS is a collection of distributed information systems operated by government agencies involved in global change research. GCDIS provides global change data to scientists and researchers, policy makers, educators, industry, and the public at large and includes multidisciplinary data from

289

MONTICELLO NPL SITES  

Office of Legacy Management (LM)

January 1 - March 31, 2008 January 1 - March 31, 2008 DOE Site Manager: Jalena Maestas This report summarizes current project status, activities implemented during January through March 2008, and provides a schedule of planned near term activities, for the Monticello Mill Tailings Site (MMTS) and the Monticello Vicinity Properties (MVP) NPL sites. This report also includes repository and Pond 4 leachate collection data, quarterly site inspection results, and site meteorological monitoring data. The first semi-annual FFA meeting of 2008 was held at UDEQ in Salt Lake City, Utah, March 26 and 27, 2008. Minutes and action items resulting from that meeting will be prepared under separate cover pending review and concurrence by EPA and UDEQ. Draft minutes and action items are scheduled for submittal by May 1, 2008.

290

Site decommissioning management plan  

SciTech Connect

The Nuclear Regulatory Commission (NRC) staff has identified 48 sites contaminated with radioactive material that require special attention to ensure timely decommissioning. While none of these sites represent an immediate threat to public health and safety they have contamination that exceeds existing NRC criteria for unrestricted use. All of these sites require some degree of remediation, and several involve regulatory issues that must be addressed by the Commission before they can be released for unrestricted use and the applicable licenses terminated. This report contains the NRC staff`s strategy for addressing the technical, legal, and policy issues affecting the timely decommissioning of the 48 sites and describes the status of decommissioning activities at the sites.

Fauver, D.N.; Austin, J.H.; Johnson, T.C.; Weber, M.F.; Cardile, F.P.; Martin, D.E.; Caniano, R.J.; Kinneman, J.D.

1993-10-01T23:59:59.000Z

291

Enforcement Documents - Savannah River Site | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Savannah River Site Enforcement Documents - Savannah River Site April 13, 2010 Consent Order, Parsons Infrastructure & Technology Group, Inc. - NCO-2010-02 Consent Order issued to Parsons Infrastructure & Technology Group, Inc. related to Nuclear Facility Construction Deficiencies and Subcontractor Oversight at the Salt Waste Processing Facility at the Savannah River Site April 13, 2010 Enforcement Letter, Parsons Technology Development & Fabrication Complex - April 13, 2010 Enforcement Letter issued to Parsons Technology Development & Fabrication Complex related to Deficiencies in the Fabrication of Safety Significant Embed Plates at the Salt Waste Processing Facility at the Savannah River Site, April 13, 2010 Enforcement Letter, Amer Industrial Technologies - April 13, 2010

292

Draft Site-Wide Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site-Wide Environmental Impact Statement Site-Wide Environmental Impact Statement for the Y-12 National Security Complex October 2009 U.S. Department of Energy National Nuclear Security Administration Y-12 Site Office DOE/EIS-0387 COVER SHEET RESPONSIBLE AGENCY: United States (U.S.) Department of Energy (DOE), National Nuclear Security Administration (NNSA) TITLE: Draft Site-wide Environmental Impact Statement for the Y-12 National Security Complex (DOE/EIS-0387) (Draft Y-12 SWEIS) CONTACT: For further information on this SWEIS, For general information on the DOE contact: National Environmental Policy Act (NEPA) process, contact: Pam Gorman Carol Borgstrom, Director Y-12 SWEIS Document Manager Office of NEPA Policy and Compliance, GC-20 Y-12 Site Office U.S. Department of Energy

293

EIS-0191: Feasibility Study for Tonawanda Site  

Energy.gov (U.S. Department of Energy (DOE))

The U.S. Department of Energys Oak Ridge Operations Office conducted a remedial investigation/feasibility study/proposed plan-environmental impact statement process for a Formerly Utilized Sites Remedial Action Program to be carried out at the Tonawanda site in Tonawanda, New York, in accordance with procedures developed under the Comprehensive Environmental Response, Compensation, and Liability Act and National Environmental Policy Act.

294

Oversight Reports - Savannah River Site | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Savannah River Site Oversight Reports - Savannah River Site September 4, 2013 Independent Oversight Review, Savannah River Site Salt Waste Processing Facility - August 2013 Review of the Savannah River Site Salt Waste Processing Facility Safety Basis and Design Development. August 5, 2013 Independent Oversight Review, Savannah River Operations Office - July 2013 Review of the Employee Concerns Program at the Savannah River Operations Office July 25, 2013 Independent Oversight Activity Report, Savannah River Site Waste Solidification Building Savannah River Site Waste Solidification Building Corrective Actions from the January 2013 Report on Construction Quality of Mechanical Systems Installation and Fire Protection Design [HIAR SRS-2013-5-07] April 22, 2013 Independent Activity Report, Savannah River Site - March 2013

295

DOE - Office of Legacy Management -- Marion Mill Site - CO 09  

Office of Legacy Management (LM)

Marion Mill Site - CO 09 Marion Mill Site - CO 09 FUSRAP Considered Sites Site: MARION MILL SITE (CO.09 ) Eliminated from further consideration under FUSRAP - deferred to the State of Colorado for appropriate action. Designated Name: Not Designated Alternate Name: None Location: Sugar Leaf Road , Boulder , Colorado CO.09-1 Evaluation Year: Circa 1983 CO.09-1 Site Operations: Milled and processed thorite and other rare earth ores in 1957 and 1958. Some of the thorium concentrate produced was shipped to Davison Chemical Company for further processing. CO.09-1 CO.09-3 Site Disposition: Eliminated - Site was licensed by AEC and the State of Colorado CO.09-2 CO.09-3 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Thorium, Natural Uranium, Other Rare Earth Ores CO.09-1

296

Benchmarking and performance improvement at Rocky Flats Technology Site  

SciTech Connect

The Rocky Flats Environmental Technology Site has initiated a major work process improvement campaign using the tools of formalized benchmarking and streamlining. This paper provides insights into some of the process improvement activities performed at Rocky Flats from November 1995 through December 1996. It reviews the background, motivation, methodology, results, and lessons learned from this ongoing effort. The paper also presents important gains realized through process analysis and improvement including significant cost savings, productivity improvements, and an enhanced understanding of site work processes.

Elliott, C. [Kaiser-Hill Co., (United States); Doyle, G. [EG and G Rocky Flats, Inc., Golden, CO (United States); Featherman, W.L. [Project Performance Corp. (United States)

1997-03-01T23:59:59.000Z

297

Process / CI Process  

NLE Websites -- All DOE Office Websites (Extended Search)

2 Process/Continual Improvement Rev. 11_0406 Page 1 of 6 2 Process/Continual Improvement Rev. 11_0406 Page 1 of 6 EOTA - Business Process Document Title: Process/Continual Improvement Document Number: P-012 Rev 11_0406 Document Owner: Elizabeth Sousa Backup Owner: David Rocha Approver(s): Melissa Otero Parent Document: Q-001 Quality Manual Notify of Changes: EOTA Staff Referenced Document(s): F-016 Process/Continual Improvement Form, P-001 Document Control Process, P-008 Corrective Action and Preventive Action, P-004 Business System Management Review P-012 Process/Continual Improvement Rev. 11_0406 Page 2 of 6 Revision History:

298

Independent Oversight Review, Savannah River Site - September 2011 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Independent Oversight Review, Savannah River Site - September 2011 September 2011 Review of the Implementation Verification Review Processes at the Savannah River Site Environmental Management Nuclear Facilities The Office of Enforcement and Oversight (Independent Oversight) within the Office of Health, Safety and Security (HSS), conducted an independent review of the Implementation Verification Review (IVR) Processes at Savannah River Site Environmental Management Nuclear Facilities. The overall objective of the Independent Oversight IVR review process includes verification that contractors and site offices have developed and implemented appropriate methods for performing IVRs (including direction for scheduling and conducting IVR activities) and measurement of the

299

Independent Activity Report, Savannah River Site - September 2010 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 2010 September 2010 Independent Activity Report, Savannah River Site - September 2010 Savannah River Site Salt Waste Processing Facility Effectiveness Review The U.S. Department of Energy (DOE), Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), participated in the DOE Savannah River Operations Office (DOE-SR), Salt Waste Processing Facility Project Office (SWPFPO), Salt Waste Processing Facility (SWPF) Integrated Safety Management System (ISMS) Effectiveness Review. The HSS participation, through its Site Lead program, provided HSS with an opportunity to maintain operational awareness and evaluate site programs, while supporting DOE line management efforts to safely and securely accomplish their missions. The onsite review was conducted during the

300

Oak Ridge Site | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oak Ridge Site Oak Ridge Site Oak Ridge Site Demolition progress at Oak Ridge Demolition progress at Oak Ridge Recovery Act workers at Alpha 5 at the Y-12 National Security Complex at Oak Ridge, Tenn., survey waste as part of the characterization process to determine its proper disposition path Recovery Act workers at Alpha 5 at the Y-12 National Security Complex at Oak Ridge, Tenn., survey waste as part of the characterization process to determine its proper disposition path Demolition progress at Oak Ridge Recovery Act workers at Alpha 5 at the Y-12 National Security Complex at Oak Ridge, Tenn., survey waste as part of the characterization process to determine its proper disposition path OVERVIEW The U.S. Department of Energy's (DOE) Oak Ridge Reservation is located on

Note: This page contains sample records for the topic "rifle processing site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

DOE - Office of Legacy Management -- Monument Valley Mill Site - AZ 0-01  

Office of Legacy Management (LM)

Monument Valley Mill Site - AZ 0-01 Monument Valley Mill Site - AZ 0-01 FUSRAP Considered Sites Site: Monument Valley Mill Site (AZ.0-01) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Monument Valley, Arizona, Processing Site Documents Related to Monument Valley Mill Site Data Validation Package for the June 2009 Water Sampling at the Monument Valley, Arizona, Processing Site; LMS/MON/S0609; October 2009 Natural and Enhanced Attenuation of Soil and Ground Water at Monument Valley, Arizona, and Shiprock, New Mexico 2006 Status Report June 2008 Data Validation Package for 2007 Groundwater Sampling at the Monument Valley, AZ Processing Site

302

MONTICELLO NPL SITES  

Office of Legacy Management (LM)

MONTICELLO NPL SITES MONTICELLO NPL SITES FFA QUARTERLY REPORT: October 1 - December 31, 2007 DOE Site Manager: Jalena Maestas 1.0 MMTS Activities/Status Repository and Pond 4 * Monthly and quarterly inspection of the repository identified no problems that have not been addressed. (inspection checklists attached). * Monthly inspection of Pond 4 identified no unacceptable conditions. * Pond 4 leachate detection and removal systems continue to operate at normal levels (leachate pumping summary attached). * Repository leachate collection and removal system (LCRS) and leachate collection system (LDS) continue to operate at normal and acceptable levels (leachate pumping summary attached). * Portions of repository cover were planted with rabbitbrush seedlings to repair areas

303

Site Map - Pantex Plant  

NLE Websites -- All DOE Office Websites (Extended Search)

Site Map Site Map Site Map Page Content Pantex.com Mission & Strategies Mission National Security Nuclear Explosive Operations Nuclear Material Operations HE Operations Strategies Advance HE Center of Excellence Exemplify a High Reliability Organization Health & Safety Safety Training Occupational Medicine Contractor Safety Environment Environmental Projects & Operations Regulatory Compliance Waste Operations Environmental Management System Environmental Document Library Public Meetings Doing Business With Pantex Procurement How We Buy Subcontracting Opportunities Supplier Information Profile Suspect/Counterfiet Items Business Definitions Documents and Forms Accounts Payable Work for Others Our Capabilities How to do Business with the Pantex eXMC Employee Information Benefits

304

ARM - Site Instruments  

NLE Websites -- All DOE Office Websites (Extended Search)

Darwin SiteInstruments Darwin SiteInstruments TWP Related Links Facilities and Instruments Manus Island Nauru Island Darwin, AUS ES&H Guidance Statement Operations Science Field Campaigns Year of Tropical Convection Visiting the Site TWP Fact Sheet Images Information for Guest Scientists Contacts Instruments : Central Facility, Darwin, Australia [ Single installation ] AERI Atmospheric Emitted Radiance Interferometer Radiometric Browse Plots Browse Data [ Single installation ] CSPHOT Cimel Sunphotometer Aerosols, Radiometric Browse Data [ Single installation ] DISDROMETER Impact Disdrometer Surface Meteorology Browse Plots Browse Data [ Single installation ] DL Doppler Lidar Cloud Properties Browse Data [ Single installation ] GNDRAD Ground Radiometers on Stand for Upwelling Radiation Radiometric Browse Plots

305

Princeton Site Ofice  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Princeton Site Ofice Princeton Site Ofice P.O. Box 102 Princeton, New Jersey 08542-0102 TO: Gregory H. Woods, General Counsel JA N Z Q= LMN N= SUBJECT: PRINCETON SITE OFFICE (PSO) 2013 ANNUAL NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) PLANNING SUMMARY Section 5(a)(7) of DOE Order 451.1B Change 3, NEPA Compliance Program, requires each Secretarial Oficer and Head of Field Organization to submit an Annual NEPA Planning Summary to the General Coun. s el. We have reviewed

306

DISS/ET modernization site/user survey details  

SciTech Connect

This purpose of this document is to provide: a record of site visits, a summary of the comments received from the user survey forms and site interviews, a description of the manual process used for personnel security clearances. The participants in the user survey and site surveys were users at: DOE contractor clearance offices (LLNL), DOE operations offices (ORO,Y-12, Albuquerque ,Sandia, San Francisco) Office of Personnel Management (OPM) - Federal Investigations Processing Center (FIPC).

Pierson, C.

1993-12-21T23:59:59.000Z

307

Washington State Energy Facility Site Evaluation Council | Open Energy  

Open Energy Info (EERE)

Energy Facility Site Evaluation Council Energy Facility Site Evaluation Council Jump to: navigation, search Name Washington State Energy Facility Site Evaluation Council Short Name EFSEC Place Olympia, Washington Zip 98504 Website http://www.efsec.wa.gov/defaul References EFSEC: Energy Facility Siting Evaluation Council[1] This article is a stub. You can help OpenEI by expanding it. The Washington State Energy Facility Siting Council (EFSEC) oversees the siting process for major energy facilities in the State of Washington. EFSEC coordinates all evaluation and licensing steps for siting certain energy facilities. References ↑ "EFSEC: Energy Facility Siting Evaluation Council" Retrieved from "http://en.openei.org/w/index.php?title=Washington_State_Energy_Facility_Site_Evaluation_Council&oldid=694902

308

Site Lead TQP Standard  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Qualification Standard for the Qualification Standard for the Office of Safety and Emergency Management Evaluations Site Lead Program May 2011 Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy 1 Qualification Standard for the Office of Safety and Emergency Management Evaluations Site Lead Program A Site Lead is an individual, normally at a senior General Schedule (GS) level or Excepted Service, who is assigned the responsibility to assess and evaluate management systems, safety and health programs, and technical activities associated with U.S. Department of Energy (DOE) nuclear and non-nuclear facilities. Typically, a Site Lead has previously qualified as a Nuclear Safety Specialist or a Senior Technical Safety Manager. For exceptionally qualified individuals,

309

ARM - TWP Nauru Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Nauru Site Nauru Site TWP Related Links Facilities and Instruments Manus Island Nauru Island Darwin, AUS ES&H Guidance Statement Operations Science Field Campaigns Year of Tropical Convection Visiting the Site TWP Fact Sheet Images Information for Guest Scientists Contacts TWP Nauru Site Location: 0° 31' 15.6" S, 166° 54' 57.60" E Altitude: 7.1 meters The Nauru facility was established in November 1998 as the second TWP climate research station. It is situated in the Denigomodu district on Nauru Island, the Republic of Nauru, which is located in the western South Pacific, approximately 1,200 miles northeast of Papua New Guinea. The ARM Program selected this location because it is on the eastern edge of the Pacific warm pool under La Niña conditions, which affect weather patterns

310

TWP Darwin Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Darwin Site Darwin Site TWP Related Links Facilities and Instruments Manus Island Nauru Island Darwin, AUS ES&H Guidance Statement Operations Science Field Campaigns Year of Tropical Convection Visiting the Site TWP Fact Sheet Images Information for Guest Scientists Contacts TWP Darwin Site Location: 12° 25' 28.56" S, 130° 53' 29.75" E Altitude: 29.9 meters The third TWP climate research facility was established in April 2002 in Darwin, Northern Territory, Australia. The facility is situated adjacent to the Australian Bureau of Meteorology's (BOM) Meteorological Office near Darwin International Airport. Darwin was chosen because it meets the scientific goal of the ARM Program, providing a unique set of climate regimes that are not seen at the other TWP facilities. Annually, Darwin

311

TWP Nauru Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Nauru Site Nauru Site TWP Related Links Facilities and Instruments Manus Island Nauru Island Darwin, AUS ES&H Guidance Statement Operations Science Field Campaigns Year of Tropical Convection Visiting the Site TWP Fact Sheet Images Information for Guest Scientists Contacts TWP Nauru Site Location: 0° 31' 15.6" S, 166° 54' 57.60" E Altitude: 7.1 meters The Nauru facility was established in November 1998 as the second TWP climate research station. It is situated in the Denigomodu district on Nauru Island, the Republic of Nauru, which is located in the western South Pacific, approximately 1,200 miles northeast of Papua New Guinea. The ARM Program selected this location because it is on the eastern edge of the Pacific warm pool under La Niña conditions, which affect weather patterns

312

Photo Gallery - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

that once supported two nuclear reactors in the 100 K Area of the Hanford Site. In this photo, a worker directs the crane operator lifting the roof panel off of the 117KE Exhaust...

313

Photo Gallery - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Reactor was the first reactor built on the Hanford Site, and was also the first full-scale reactor in the world. It took about one year to build B Reactor. This photo is from 1944...

314

Photo Gallery - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

soil generated by ARRA-funded cleanup projects across the Hanford Site. In this photo, lights are installed for a new access road to ERDF and striping of the roadway was...

315

Photo Gallery - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

that once supported two nuclear reactors in the 100 K Area of the Hanford Site. In this photo, a crane lifts the roof panel from the 117KE Exhaust Air Filter Building, with the K...

316

Photo Gallery - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

the soil beneath the former location of the K East Basin in the 100K Area. In this photo from late September, the first bucket of soil from the waste site known as UPR-100-K-1...

317

Photo Gallery - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

of the K East Basin in the 100K Area, known as the UPR-100-K-1 Waste Site. In this photo, an excavator prepares materials for load out. The track hoe will mix the material...

318

Photo Gallery - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

that once supported two nuclear reactors in the 100 K Area of the Hanford Site. In this photo, workers guide a roof panel as it is lifted from an exhaust air filter building. The...

319

The DOD Siting Clearinghouse  

Energy.gov (U.S. Department of Energy (DOE))

Presentationgiven at the Fall 2011 Federal Utility Partnership Working Group (FUPWG) meetingprovides an overview on the U.S. Department of Defense (DoD) clearinghouse for siting renewable energy technologies.

320

WRPS Contract - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

PDF J.3 Hanford Site Services and Interface Requirements Matrix 198 PDF J.4 Performance Evaluation and Measurement Plan (PEMP) 288 PDF J.5 Performance Guarantee Agreement PDF J.6...

Note: This page contains sample records for the topic "rifle processing site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

SRNL Site Map  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE DOE-EM DOE-SR NNSA SRS SRNS Site Map Disclaimer Legal Information SRNL * Aiken * SC * 29808-0001 * SRNL Operator: 803-725-6211 SRNL is the DOE Office of Environmental...

322

CERCLA - Site Selector  

Office of Legacy Management (LM)

Energy | 1000 Independence Ave., SW | Washington, DC 20585 202-586-7550 | f202-586-1540 Web Policies | No Fear Act | Site Map | Privacy & Security | USA Jobs | Plug-Ins | Document...

323

Land Management - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

land. Long-Term Stewardship For more information, contact the Site Real Estate Officer, Boyd Hathaway at (509) 376-7340 or by email at HBBoydHathaway@rl.gov. Last Updated 0331...

324

ParaSITE  

E-Print Network (OSTI)

paraSITE proposes the appropriation of exterior ventilation systems on existing architecture to inflate pneumatic shelters that are designed for homeless people. This project involves the production of a series of inflatable ...

Rakowitz, Michael

1998-01-01T23:59:59.000Z

325

Site Environmental Report for 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

7170 -2012 7170 -2012 Volume I Site Environmental Report for 2012 Environment/Health/Safety Division September 2013 DISCLAIMER This document was prepared as an account of work sponsored by the United States Government. While this document is believed to contain correct information, neither the United States Government nor any agency thereof, nor The Regents of the University of California, nor any of their employees, makes any warranty, express or implied, or assumes any legal responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by its trade name, trademark, manufacturer, or otherwise, does not necessarily

326

SSA Old Aspen Site  

NLE Websites -- All DOE Office Websites (Extended Search)

SSA-OA) SSA-OA) View an aerial photo-map of the SSA-OA site The two huts and boardwalk The scaffold flux tower The base of the scaffold flux tower One of the canopy access towers The SRC meteorology tower The truss tower and cables from the flux tower Cabled tethersonde above the SSA Old Aspen (SSA-OA) site The tethersonde about to be launched (tethered balloon and radiosonde) Picture of the SRC meteorological tower at the SSA-OA site taken from the flux tower. Improved road into the SSA-OA site within the Prince Albert National Park. Aerial of SSA-OA tower during the winter IFC. SSA-OA flux tower about 40 meters in height, approximately 20 meters above canopy. Photograph of investigator hut and boardwalk at the SSA-OA site. Andy Black and associate within the hut at the SSA-OA site showing the various recording and data display instruments from the tower.

327

Colorado | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

16, 2010 16, 2010 CX-001709: Categorical Exclusion Determination Application Titled: Integration of Noise and Coda Correlation Data CX(s) Applied: A9 Date: 04/16/2010 Location(s): Colorado Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 15, 2010 CX-001652: Categorical Exclusion Determination Structure Replacement Hayden-Gore Pass 138 Kilovolt Transmission Line (Structure 25/5) Spring 2010 CX(s) Applied: B4.6 Date: 04/15/2010 Location(s): Colorado Office(s): Western Area Power Administration-Rocky Mountain Region April 15, 2010 CX-001631: Categorical Exclusion Determination Install Wells and Boreholes at the Old Rifle Colorado Processing Site CX(s) Applied: B3.1 Date: 04/15/2010 Location(s): Old Rifle, Colorado Office(s): Legacy Management April 12, 2010

328

Independent Activity Report, Savannah River Site - June 2010 | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 2010 June 2010 Independent Activity Report, Savannah River Site - June 2010 June 2010 Savannah River Site Salt Waste Processing Facility Construction Site Orientation Visit The U.S. Department of Energy (DOE) Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), conducted an orientation visit on June 21-25, 2010, at the Salt Waste Processing Facility (SWPF) construction site at the DOE Savannah River Site (SRS). The purpose of the visit was to determine methods for HSS to carry out its independent oversight responsibilities with respect to this project in coordination with DOE's Savannah River Operations Office (DOE-SR). Independent Activity Report, Savannah River Site - June 2010 More Documents & Publications Independent Activity Report, Savannah River Site - May 2010

329

Benefits of Site-wide NEPA Review | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Benefits of Site-wide NEPA Review Benefits of Site-wide NEPA Review Benefits of Site-wide NEPA Review The purpose of this guidance memorandum is to describe potential benefits of conducting a site-wide NEPA review (environmental impact statement or environmental assessment). I believe that this information will help program and field offices prepare their annual NEPA planning summaries and their overall NEPA compliance strategies. Site-wide reviews can aid the Department of Energy (DOE) in meeting its goals to streamline the NEPA process, to make that process more useful to decision makers and the public, and to reduce the time and cost required to prepare NEPA documents Benefits of Site-wide NEPA Review More Documents & Publications Benefits of Site-wide NEPA National Environmental Policy Act Review (1994)

330

Independent Activity Report, Savannah River Site - July 2010 | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Activity Report, Savannah River Site - July 2010 Independent Activity Report, Savannah River Site - July 2010 Independent Activity Report, Savannah River Site - July 2010 July 2010 Savannah River Site Salt Waste Processing Facility Construction Project Review A Department of Energy Construction Project Review (CPR) of the Salt Waste Processing Facility (SWPF) project was conducted on July 19-22, 2010, at the request of the Principal Deputy Secretary, Office of Environmental Management (EM-2). The purpose of the review was to assess the cost, schedule, and technical progress against the approved Performance Baseline. Independent Activity Report, Savannah River Site - July 2010 More Documents & Publications Independent Activity Report, Savannah River Site - September 2010 Independent Activity Report, Savannah River Site - May 2010

331

Independent Activity Report, Savannah River Site - May 2010 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 2010 May 2010 Independent Activity Report, Savannah River Site - May 2010 May 2010 Savannah River Site Salt Waste Processing Facility Construction Site Walkthrough The U.S. Department of Energy (DOE), Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), conducted a visit to the Savannah River Site (SRS) on May 4-5, 2010. The visit focused on the Salt Waste Processing Facility (SWPF) Construction Site, which is managed by Parsons with DOE line management program direction and oversight from the DOE Savannah River Operations Office. Independent Activity Report, Savannah River Site - May 2010 More Documents & Publications Independent Activity Report, Savannah River Site - June 2010 Consent Order, Parsons Infrastructure & Technology Group, Inc. -

332

Independent Oversight Review, Idaho Site - November 2011 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site - November 2011 Site - November 2011 Independent Oversight Review, Idaho Site - November 2011 November 2011 Review of Implementation Verification Review Processes at the Idaho Site - Phase 1 of 2 This report documents the first phase of an independent review of implementation verification review (IVR) processes at the Idaho Site conducted by the Office of Enforcement and Oversight (Independent Oversight) within the Office of Health, Safety and Security (HSS). The purpose of the complete Independent Oversight review is to evaluate, in two phases, the processes and methods used at the Idaho Site for verifying implementation of new or substantially revised facility safety basis hazard controls. The objective of this Phase 1 assessment was to evaluate the extent to which the Idaho Operations Office (DOE-ID) and primary facility

333

Tanks focus area site needs assessment FY 1997  

SciTech Connect

The Tanks Focus Area`s (TFA`s) mission is to manage an integrated technology development program that results in the application of technology to safely and efficiently accomplish tank waste remediation across the U.S. Department of Energy (DOE) complex. The TFA uses a systematic process for developing its annual program that draws from the tanks technology development needs expressed by four DOE tank waste sites - Hanford Site, Idaho National Engineering and Environmental Laboratory (INEEL), Oak Ridge Reservation (ORR), and Savannah River Site (SRS). The process is iterative and involves six steps: (1) Site needs identification and documentation, (2) Site communication of priority needs, (3) Technical response development, (4) Review technical responses, (5) Develop program planning documents, and (6) Review planning documents. This document describes the outcomes of the first two steps: site needs identification and documentation, and site communication of priority needs. It also describes the initial phases of the third and fourth steps: technical response development and review technical responses. Each site`s Site Technology Coordination Group (STCG) was responsible for developing and delivering priority tank waste needs. This was accomplished using a standardized needs template developed by the National STCG. The standard template helped improve the needs submission process this year. The TFA received the site needs during December 1996 and January 1997.

NONE

1997-04-01T23:59:59.000Z

334

NSA-Fen Site  

NLE Websites -- All DOE Office Websites (Extended Search)

NSA-Fen) NSA-Fen) The Fen from the air, looking North. You can see the boardwalk, the hut, and the size of the bog. The road (Highway 391) is visible at the top. The round "crater" near the base of the boardwalk on the right is a collapsed palsa. View an aerial photo-map of the NSA-Fen site. The ground cover on the Fen itself The hut and flux tower The Fen site from the shore looking toward the hut The Fen site flux tower The boardwalk in the Fen, looking back at the shore The generator shed and the storage tent The NSA-Fen site from the air during IFC-2. Top of image is to Southeast. The NSA-Fen site in September (IFC-3) 1994 looking to the southeast. The tower is at the end of the boardwalk in right center of image with the hut near the center. The boardwalk connects to the far border at left center of the slide. Note that the tamarack (deciduous evergreen) within the fen has its fall colors.

335

SSA Mixed Canopy Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Mixed Canopy Site (SSA-Mix) Mixed Canopy Site (SSA-Mix) The TE canopy tower The mixed trees Terrestrial Ecology canopy access tower at the SSA mixed coniferous/deciduous site. A picture taken looking down from the TE canopy access tower at the SSA mixed auxiliary site, showing the aspen and spruce canopies. Back to the BOREAS Photo Page Index Other Sites: NSA Photos ||NSA-BP Photos | NSA-Fen Photos | NSA-OA Photos | NSA-OBS Photos | NSA-OJP Photos | NSA-UBS Photos | NSA-YJP Photos | NSA-Ops Photos SSA Photos || SSA-Airport Photos | SSA-Fen Photos | SSA-Mix Photos | SSA-OA Photos | SSA-OBS Photos | SSA-OJP Photos | SSA-YA Photos | SSA-YJP Photos | SSA-Ops Photos | ORNL DAAC Home || ORNL Home || NASA || Privacy, Security, Notices || Data Citation || Rate Us || Help | User Services - Tel: +1 (865) 241-3952 or E-mail: uso@daac.ornl.gov

336

Princeton Site Office  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Princeton Site Office Princeton Site Office P.O. Box 102 Princeton, New Jersey 08542-0102 JAN 18 2012 To: Timothy G. Lynch , Acting General Counsel Subject: Princeton Site Office (PSO) 2012 Annual National Environmental Policy Act (NEPA) Planning Summary Section 5(a)(7) of DOE Order 451 .1 B Change 2, NEPA Compliance Program , requires each Secretarial Officer and Head of Field Organization to submit an annual NEPA Planning Summary to the General Counsel. We have reviewed your associated December 5, 2011 , memorandum and in consultation with Princeton Plasma Physics Laboratory (PPPL) staff determined that we have no Environmental Impacts Statements or Environmental Assessments either ongoing or forecast for the next 12 to 24 months. If you have any questions or need additional information

337

Former Sites Restoration. Division  

Office of Legacy Management (LM)

@j&s* **$r* :. .+:., @j&s* **$r* :. .+:., II' .,.. I .&i. , :"': T.1 . i *&+t&&., @i i -:.+; L I. * . . .p.isit-!'..r'ir~i _, +.&.., . I. :?I,?.* .L,! j?' aa&* pi 4 L', ..b,- ., .e /w.1( ,v_.c ~A&$?>*:, ,..:.' .1 > . . . . . *. ,.. .I., .( j .~.~:,;;,.".,Certificafion ,Dockef for The ;,il' t:i~>$:+-.. ~~y:Remeciial Action. Performed "' . ::;:cxcgt the @+zb Gate Site in . ;' ! ,Oak Ridge, Tennessee, 7.99 7- 7 992 -.. Department .of Energy Former Sites Restoration. Division . ,Oak Ridge Operations .Office _. February 7 994 @ Printed on recycledhcy&ble paper. CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE ELZA GAP SITE IN OAK RIDGE, TENNESSEE, 1991-1992 FEBRUARY 1994 I Prepared for UNITED STATES DEPARTMENT OF ENERGY

338

Manhattan Project: Site Map  

Office of Scientific and Technical Information (OSTI)

SITE MAP SITE MAP Resources > Site Map THE MANHATTAN PROJECT Events 1890s-1939: Atomic Discoveries A Miniature Solar System, 1890s-1919 Exploring the Atom, 1919-1932 Atomic Bombardment, 1932-1938 The Discovery of Fission, 1938-1939 Fission Comes to America, 1939 1939-1942: Early Government Support Einstein's Letter, 1939 Early Uranium Research, 1939-1941 Piles and Plutonium, 1939-1941 Reorganization and Acceleration, 1940-1941 The MAUD Report, 1941 A Tentative Decision to Build the Bomb, 1941-1942 1942: Difficult Choices More Uranium Research, 1942 More Piles and Plutonium, 1942 Enter the Army, 1942 Groves and the MED, 1942 Picking Horses, November 1942 Final Approval to Build the Bomb, December 1942 1942-1944: The Uranium Path to the Bomb Y-12: Design, 1942-1943 Y-12: Construction, 1943

339

Particle Physics Education Sites  

NLE Websites -- All DOE Office Websites (Extended Search)

쭺-¶ 쭺-¶ Particle Physics Education Sites ¡]¥H¤U¬°¥~¤åºô¯¸¡^ quick reference Education and Information - National Laboratory Education Programs - Women and Minorities in Physics - Other Physics Sites - Physics Alliance - Accelerators at National Laboratories icon Particle Physics Education and Information sites: top Introduction: The Particle Adventure - an interactive tour of particle physics for everyone: the basics of theory and experiment. Virtual Visitor Center of the Stanford Linear Accelerator Center. Guided Tour of Fermilab, - overviews of several aspects of Particle Physics. Also check out Particle Physics concepts. Probing Particles - a comprehensive and straight-forward introduction to particle physics. Big Bang Science - approaches particle physics starting from the theoretical origin of the universe.

340

Microsoft Word - Site Selection  

NLE Websites -- All DOE Office Websites (Extended Search)

Selection Selection One of the very first tasks of General Leslie Groves and the Manhattan Project in early 1943 was to locate and acquire sites in the United States where uranium and plutonium could be produced, as well as a site where the atomic bomb actually would be constructed. Production of uranium and plutonium required vast amounts of power. Thus, Oak Ridge, Tennessee, and Hanford, Washington, were chosen because of proximity to major rivers. Oak Ridge could draw on the power of the hydroelectric plants on the Tennessee River. Hanford could use the power from the Columbia River. The cold waters of the Columbia also could be used to cool the plutonium production reactors at Hanford. A third site, with

Note: This page contains sample records for the topic "rifle processing site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

ARM - Site Index  

NLE Websites -- All DOE Office Websites (Extended Search)

govSite Index govSite Index Expand | Collapse Site Index Videos Image Library About ARM About ARM (home) ARM and the Recovery Act ARM and the Recovery Act (home) ARM Recovery Act Project FAQs Recovery Act Instruments ARM Climate Research Facility Contributions to International Polar Year (IPY) ARM Climate Research Facility Contributions to International Polar Year (IPY) (home) ARM Education and Outreach Efforts Support IPY Research Support for International Polar Year (IPY) ARM Organization ARM Organization (home) Laboratory Partners ARM Safety Policy ARM Science Board ARM Science Board (home) Board Business Become a User Comments and Questions Contacts Contacts (home) ARM Engineering and Operations Contacts Facility Statistics Facility Statistics (home) Historical Field Campaign Statistics

342

AWEA Wind Project Siting Seminar  

Energy.gov (U.S. Department of Energy (DOE))

The AWEA Wind Project Siting Seminar takes an in-depth look at the latest siting challenges and identify opportunities to reduce risks associated with the siting and operation of wind farms to...

343

Vitrification technology for Hanford Site tank waste  

SciTech Connect

The US Department of Energy`s (DOE) Hanford Site has an inventory of 217,000 m{sup 3} of nuclear waste stored in 177 underground tanks. The DOE, the US Environmental Protection Agency, and the Washington State Department of Ecology have agreed that most of the Hanford Site tank waste will be immobilized by vitrification before final disposal. This will be accomplished by separating the tank waste into high- and low-level fractions. Capabilities for high-capacity vitrification are being assessed and developed for each waste fraction. This paper provides an overview of the program for selecting preferred high-level waste melter and feed processing technologies for use in Hanford Site tank waste processing.

Weber, E.T.; Calmus, R.B.; Wilson, C.N.

1995-04-01T23:59:59.000Z

344

Tanks Focus Area site needs assessment FY 1998  

SciTech Connect

This report documents the process used by the Tanks Focus Area (TFA) to analyze and develop responses to technology needs submitted by four major US Department of Energy (DOE) sites with radioactive tank waste problems, and the initial results of the analysis. The sites are the Hanford Site, Idaho National Engineering and Environmental Laboratory (INEEL), Oak Ridge Reservation (ORR), and Savannah River Site (SRS). This document describes the TFA`s process of collecting site needs, analyzing them, and creating technical responses to the sites. It also summarizes the information contained within the TFA needs database, portraying information provided by four major DOE sites with tank waste problems. The overall TFA program objective is to deliver a tank technology program that reduces the current cost, and the operational and safety risks of tank remediation. The TFA`s continues to enjoy close, cooperative relationships with each site. During the past year, the TFA has fostered exchanges of technical information between sites. These exchanges have proven to be healthy for all concerned. The TFA recognizes that site technology needs often change, and the TFA must be prepared not only to amend its program in response, but to help the sites arrive at the best technical approach to solve revised site needs.

NONE

1998-03-01T23:59:59.000Z

345

DOE - Office of Legacy Management -- Riverton Mill Site - WY 0-04  

Office of Legacy Management (LM)

Mill Site - WY 0-04 Mill Site - WY 0-04 FUSRAP Considered Sites Site: Riverton Mill Site (WY.0-04 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Riverton, Wyoming, Processing Site Documents Related to Riverton Mill Site Data Validation Package for the November 2008 Groundwater and Surface Water Sampling at the Riverton, Wyoming, Processing Site. February 2009 U. S. Department of Energy (DOE) Status and Planned Actions at the Riverton, Wyoming, Uranium Mill Tailing Radiation Control Act (UMTRCA) Title I Site April Gil, PhD Environment Team Lead Office of Legacy Management (LM) May 2, 20122 Status and Action Summary 􀂄 Surface

346

Distinguishing Between Site Waste, Natural, and Other Sources of Contamination at Uranium and Thorium Contaminated Sites - 12274  

SciTech Connect

Uranium and thorium processing and milling sites generate wastes (source, byproduct, or technically enhanced naturally occurring material), that contain contaminants that are similar to naturally occurring radioactive material deposits and other industry wastes. This can lead to mis-identification of other materials as Site wastes. A review of methods used by the US Army Corps of Engineers and the Environmental Protection Agency to distinguish Site wastes from potential other sources, enhanced materials, and natural deposits, at three different thorium mills was conducted. Real case examples demonstrate the importance of understanding the methods of distinguishing wastes. Distinguishing between Site wastes and enhanced Background material can be facilitated by establishing and applying a formal process. Significant project cost avoidance may be realized by distinguishing Site wastes from enhanced NORM. Collection of information on other potential sources of radioactive material and physical information related to the potential for other radioactive material sources should be gathered and reported in the Historical Site Assessment. At a minimum, locations of other such information should be recorded. Site decision makers should approach each Site area with the expectation that non site related radioactive material may be present and have a process in place to distinguish from Site and non Site related materials. (authors)

Hays, David C. [United States Army Corps of Engineers, Kansas City, Missouri, 64106 (United States)

2012-07-01T23:59:59.000Z

347

WCI | Cutting-Edge Facilities | Site 300 Experimental Test Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Site 300 Site Access Contained Firing Facility (CFF) Continuously Operating Reference Station (CORS) What is Site 300? Lawrence Livermore National Laboratory's Site 300 is an experimental test site operated by the Lawrence Livermore National Security, LLC, for the Department of Energy's National Nuclear Security Administration. It is situated on 7,000 acres in rural foothills approximately six miles southwest of downtown Tracy and 15 miles southeast of Livermore. Site 300 was established in 1955 as a non-nuclear explosives test facility to support Livermore Laboratory's national security mission. The site gets its name from the early days of Lawrence Livermore, when the main laboratory was called Site 200 and the test facility was Site 300 (Lawrence Berkeley National Laboratory was Site 100). Today, work at Site 300

348

Berkeley Lab: Educational Sites  

NLE Websites -- All DOE Office Websites (Extended Search)

Educational Sites Educational Sites The Center for Science & Engineering Education (CSEE) Berkeley Lab's Center for Science & Engineering Education (CSEE) carries out the Department of Energy's education mission to train the next generation of scientists, as well as helping them to gain an understanding of the relationships among frontier science, technology, and society. CSEE supports science literacy in the community and nationally through a broad range of programs from elementary school to undergraduate and graduate education, including internships, mentoring, school workshops and summer research programs for teachers. Through its broad range of programs, CSEE serves as the center for Berkeley Lab's science education efforts, developing partnerships with schools, government agencies, and non-profit

349

Summary Site Environmental Report  

NLE Websites -- All DOE Office Websites (Extended Search)

Site Environmental Report Site Environmental Report for Calendar Year 2011 ANL-12/02 (Summary) Environment, Safety, and Quality Assurance Division Argonne National Laboratory Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor UChicago Argonne, LLC, nor any of their employees or officers, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product,

350

PPPL Site Environmental Report  

SciTech Connect

Contained in the following report are data for radioactivity in the environment collected and analyzed by Princeton Plasma Physics Laboratorys Princeton Environmental, Analytical, and Radiological Laboratory (PEARL). The PEARL is located on?site and is certified for analyzing radiological and non?radiological parameters through the New Jersey Department of Environmental Protections Laboratory Certification Program, Certification Number 12471. Non?radiological surface and ground water samples are analyzed by NJDEP certified subcontractor laboratories QC, Inc. and Accutest Laboratory. To the best of our knowledge, these data, as contained in the Annual Site Environmental Report for 2011, are documented and certified to be correct.

Virginia Finley, Robeert Sheneman and Jerry Levine

2012-12-21T23:59:59.000Z

351

Hanford Workers Compensation - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

About Us > Hanford Site Wide Programs > Hanford Workers Compensation About Us Hanford Overview and History Hanford Cleanup Hanford Site Wide Programs Hanford Workers Compensation...

352

Hanford Private Tours - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Private Tours Hanford Site Tours Hanford Tour Restrictions Hanford Site Tours Hanford Tours for Governmental Officials Hanford Tours for Tribal Affairs Hanford Private Tours Media...

353

Cleanup Sites | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Sites Cleanup Sites The 33,500-acre Oak Ridge Reservation, outlined in red, contains three primary cleanup areas-- the East Tennessee Technology Park, Oak Ridge National...

354

VPP Photo Gallery - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Hanford Site Voluntary Protection Program > VPP Communications > VPP Photo Gallery Hanford Site Voluntary Protection Program Photo Gallery Email Email Page | Print Print Page |Text...

355

Hazardous Waste Facilities Siting (Connecticut) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Facilities Siting (Connecticut) Facilities Siting (Connecticut) Hazardous Waste Facilities Siting (Connecticut) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Program Info State Connecticut Program Type Siting and Permitting Provider Department of Energy and Environmental Protection These regulations describe the siting and permitting process for hazardous waste facilities and reference rules for construction, operation, closure,

356

TWRS phase I privatization site environmental baseline and characterization plan  

SciTech Connect

This document provides a plan to characterize and develop an environmental baseline for the TWRS Phase I Privatization Site before construction begins. A site evaluation study selected the former Grout Disposal Area of the Grout Treatment Facility in the 200 East Area as the TWRS Phase I Demonstration Site. The site is generally clean and has not been used for previous activities other than the GTF. A DQO process was used to develop a Sampling and Analysis Plan that would allow comparison of site conditions during operations and after Phase I ends to the presently existing conditions and provide data for the development of a preoperational monitoring plan.

Shade, J.W.

1997-09-01T23:59:59.000Z

357

Tanks Focus Area site needs assessment FY 2000  

SciTech Connect

This report documents the process used by the Tanks Focus Area (TFA) to analyze and develop responses to technology needs submitted by five major U.S. Department of Energy (DOE) sites with radioactive tank waste problems, and the initial results of the analysis. The sites are the Hanford Site, Idaho National Engineering and Environmental Laboratory (INEEL), Oak Ridge Reservation (ORR), Savannah River Site (SRS), and West Valley Demonstration Project (WVDP). During the past year, the TFA established a link with DOE's Fernald site to exchange, on a continuing basis, mutually beneficial technical information and assistance.

RW Allen

2000-04-11T23:59:59.000Z

358

Indoor Sampler Siting  

NLE Websites -- All DOE Office Websites (Extended Search)

Indoor Sampler Siting Indoor Sampler Siting Title Indoor Sampler Siting Publication Type Conference Proceedings Year of Publication 2009 Authors Sohn, Michael D., and David M. Lorenzetti Conference Name 11th International Conference on Air Distribution in Rooms Conference Location Busan, Korea Abstract Contaminant releases in or near a building can lead to significant human exposures unless prompt response is taken. U.S. Federal and local agencies are implementing programs to place air-monitoring samplers in buildings to quickly detect biological agents. We describe a probabilistic algorithm for siting samplers in order to detect accidental or intentional releases of biological material. The algorithm maximizes the probability of detecting a release from among a suite of realistic scenarios. The scenarios may differ in any unknown, for example the release size or location, weather, mode of building operation, etc. The algorithm also can optimize sampler placement in the face of modeling uncertainties, for example the airflow leakage characteristics of the building, and the detection capabilities of the samplers. In anillustrative example, we apply the algorithm to a hypothetical 24-room commercial building, finding optimal networks for a variety of assumed sampler types and performance characteristics. We also discuss extensions of this work for detecting ambient pollutants in buildings, and for understanding building-wide airflow, pollutant dispersion, and exposures

359

Savannah River Site Robotics  

ScienceCinema (OSTI)

Meet Sandmantis and Frankie, two advanced robotic devices that are key to cleanup at Savannah River Site. Sandmantis cleans hard, residual waste off huge underground storage tanks. Frankie is equipped with unique satellite capabilities and sensing abilties that can determine what chemicals still reside in the tanks in a cost effective manner.

None

2012-06-14T23:59:59.000Z

360

Solar Site Survey Toolkit  

Energy.gov (U.S. Department of Energy (DOE))

After a couple outings, a principal technologist at Sandia National Laboratories saw a need for a travel kit that would have the necessary tools to make the task of site surveys more manageable and safer. They have had great success using the kit in the field already.

Note: This page contains sample records for the topic "rifle processing site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

A Messenian Site  

Science Journals Connector (OSTI)

...Messenian Site 10.1126/science.204.4398.1192 DAVID LUBELL Department of Anthropology, University of Alberta, Edmonton...even more had the book been edited with a harsher hand. DAVID LUBELL Department ofAnthropology, University ofAlberta, Edmonton...

DAVID LUBELL

1979-06-15T23:59:59.000Z

362

Proposed Drill Sites  

SciTech Connect

Proposed drill sites for intermediate depth temperature gradient holes and/or deep resource confirmation wells. Temperature gradient contours based on shallow TG program and faults interpreted from seismic reflection survey are shown, as are two faults interpreted by seismic contractor Optim but not by Oski Energy, LLC.

Lane, Michael

2013-06-28T23:59:59.000Z

363

Proposed Drill Sites  

DOE Data Explorer (OSTI)

Proposed drill sites for intermediate depth temperature gradient holes and/or deep resource confirmation wells. Temperature gradient contours based on shallow TG program and faults interpreted from seismic reflection survey are shown, as are two faults interpreted by seismic contractor Optim but not by Oski Energy, LLC.

Lane, Michael

364

Sundial Substation Site Baxter Road Substation Site Casey Road  

NLE Websites -- All DOE Office Websites (Extended Search)

Sundial Substation Site Baxter Road Substation Site Casey Road Substation Site Monahan Creek Substation Site YALE DAM MERWIN DAM S i l v e r L a k e Lake Merwin Y a l e L a k e V a...

365

T-720: Blue Coat Director HTTP Trace Processing Flaw Permits...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Blue Coat Director HTTP Trace Processing Flaw Permits Cross-Site Scripting Attacks T-720: Blue Coat Director HTTP Trace Processing Flaw Permits Cross-Site Scripting Attacks...

366

What's New - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Contracts DOE-ORP Contracting Officers Compensation Claim Process Presentations About Hanford Fire Department Representatives Hanford Cultural Resources January 5, 2015 For...

367

EERE: Clean Cities Mobile Sites  

NLE Websites -- All DOE Office Websites (Extended Search)

Clean Cities Mobile Sites Alternative Fueling Station Locator FuelEconomy.gov Truck Stop Electrification Locator...

368

US nuclear waste site "unsuitable"  

Science Journals Connector (OSTI)

... about the suitability of Yucca Mountain as the site for the nation's first highlevel nuclear ...

Mary Manning

1988-01-28T23:59:59.000Z

369

Hazardous Waste Disposal Sites (Iowa)  

Energy.gov (U.S. Department of Energy (DOE))

These sections contain information on fees and monitoring relevant to operators of hazardous waste disposal sites.

370

Cleanup Sites | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cleanup Sites Cleanup Sites Cleanup Sites Center Map As the largest environmental cleanup program in the world, EM has been charged with the responsibility of cleaning up 107 sites across the country whose area is equal to the combined area of Rhode Island and Delaware. EM has made substantial progress in nearly every area of nuclear waste cleanup and as of September 2012, completed cleanup at 90 of these sites. The "active" sites continue to have ongoing cleanup projects under EM's purview. Use the interactive map above to see states that still have cleanup activities associated with them. The tooltip in the upper-right corner shows site data for each state, and each marker gives site information as well as links to the site fact sheets here on the EM website and each site's full website.

371

Independent Oversight, Nevada National Security Site - March 2012 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Oversight, Nevada National Security Site - March 2012 Independent Oversight, Nevada National Security Site - March 2012 Independent Oversight, Nevada National Security Site - March 2012 March 2012 Review of the Nevada National Security Site Implementation Verification Review Processes This report documents the independent review of implementation verification review (IVR) processes at the Nevada National Security Site (NNSS) conducted by the Office of Enforcement and Oversight (Independent Oversight), which is within the Office of Health, Safety and Security (HSS). The review was performed by the HSS Office of Safety and Emergency Management Evaluations from February 6 to 15, 2012. Independent Oversight, Nevada National Security Site - March 2012 More Documents & Publications Independent Oversight Review, Y-12 National Security Complex - June 2012

372

Independent Oversight Review, Savannah River Site - September 2012 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site - September 2012 Savannah River Site - September 2012 Independent Oversight Review, Savannah River Site - September 2012 September 2012 Review of the Savannah River Site, Salt Waste Processing Facility, Construction Quality of Piping & Pipe Supports The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security, conducted an independent review of construction quality at the U.S. Department of Energy (DOE) Savannah River Site (SRS) Salt Waste Processing Facility (SWPF). The focus of the review, performed on site between May 14 and 18, 2012, was piping and pipe supports. The review team also observed installation of two tanks in the dark cells (DCs). Subsequent to the onsite review, procurement records were reviewed for quality-related piping and piping system components.

373

MEMORANDUM TO: FILE SITE  

Office of Legacy Management (LM)

SITE SITE NAME: /+%&'&&c /-i-QS~,~~-L ALTERNATE ------------ -------------------------- NAME: - -------------------___ C 1 T-f: -~~~~~L--~-----_--___,TATE: '"' y-/ OWNER ('=I B-----Z- Past: L?!lc~i&~~~~-~-~ Cut-rent: - Owner cnntacted q yes q:no; i,f yes, dats-c~~Fact,d------------- TYPE OF OPESATION ---------m-L----- @Research & Develapment & Facility Type 0 Production scale testing 0 Pilot Scale a bnch scale ~~~~~~~ 0 Theoretical Studies G Sample 84 Analysis 0 Production G Disposal/Storage Manufacturing University Research Organization Government Sponsored Facility llther +r.PfTzK-- --------------------- TYPZ OF CONTRACT ~~__----__------ q Prime E SubccntractkrT u&lv.$Ch,ck>b 0 Purchase Order 0 Other information

374

NDB Site Map  

NLE Websites -- All DOE Office Websites (Extended Search)

Site map NDB Home Search Structures Search DNA Search RNA Advanced Search Nucleic acid tools RNA 3D motif atlas Non-redundant lists RNA base triples atlas WebFR3D R3D Align Contact NDB Mailing Address About NDB NDB Members Goal References Publications Site map Tools Software Standards Standard Reference Supplementary Information Ideal Geometries X-PLOR Parameters Valence Geometries RNA Ontology Consortium mmCIF Resources PDBML Resources Education Introduction to Nucleic Acids: DNA Definition of terms RNA Base Pair Families RNA Base-Phosphate Families Base Stacking Interactions Non Redundant list Equivalence classes RNA 3D Motifs Relative Frequency Introduction to Nucleic Acids: RNA Nucleic Acid Highlight (PDB): DNA DNA Polymerase Nucleosome Transfer RNA RNA Polymerase Self-splicing RNA

375

AshtabulaSite.cdr  

Office of Legacy Management (LM)

Ashtabula, Ohio, Site comprises 42.5 acres of Ashtabula, Ohio, Site comprises 42.5 acres of privately owned land adjacent to the city of Ashtabula, about 55 miles east of Cleveland. From 1962 to 1988 Reactive Metals Inc. (RMI) operated a facility on the property that manufactured metallic uranium tubes and rods and experimental quantities of thorium metal for use in the Hanford, Washington; and Savannah River, Georgia, weapons program reactors. The facility operated under contract to the U.S. Atomic Energy Commission and its successor agency the U.S. Department of Energy (DOE). RMI also extruded depleted uranium under a U.S. Nuclear Regulatory Commission (NRC) license and extruded nonradioactive materials, primarily copper-based, for the private sector. RMI once operated a small wastewater evaporation pond near the northern boundary of the plant area for

376

Transmission Siting_071508.indd  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Coordinating Interstate Electric Coordinating Interstate Electric Transmission Siting: An Introduction to the Debate The National Council on Electricity Policy 2 DISCLAIMER: The National Council on Electricity Policy is funded by the U.S. Department of Energy and the U.S. Environmental Protection Agency. The views and opinions expressed herein are strictly those of the authors and may not necessarily agree with the positions of the National Council on Electricity Policy, its committ ee members or the organizations they represent, the National Council funders, or those who commented on the paper during its draft ing. ACKNOWLEDGMENTS Coordinating Interstate Electric Transmission Siting: An Introduction to the Debate was prepared with the fi nancial assistance of a grant from the U.S. Department of Energy (DOE) Offi ce of Electricity Delivery

377

Land Validation web site  

NLE Websites -- All DOE Office Websites (Extended Search)

graphs and more worldwide NPP datasets graphs and more worldwide NPP datasets Graphs of biomass dyanmics and climate data for grassland sites have been added to the global terrestrial Net Primary Production (NPP) reference database at the ORNL DAAC. The NPP database has been compiled by Dick Olson and Jonathan Scurlock under the auspices of the International Geosphere-Biosphere Programme and funding from the Terrestrial Ecology Program of NASA's Office of Earth Science. Browsing through the graphs will help users to select data of interest, and to see relationships between grassland biomass changes and driving climate variables such as rainfall. Graphs are presently available for 14 of the 31 grassland sites. In addition, two more well-known worldwide datasets are available for browsing and downloading from the ORNL DAAC's NPP Web pages. The Osnabruck

378

NIAGARA FALLS STORAGE SITE  

Office of Legacy Management (LM)

:i" :i" _,, ' _~" ORISE 95/C-70 :E : i:; :' l,J : i.: RADIOLOGICAL SURVEY Op BUILDINGS 401, ' 403, AND ' m HITTMAN BUILDING $ <,' 2:. NIAGARA FALLS STORAGE SITE I .~~ ; " LEWISTON, ' NEW YORK : f? j:,:i I ,.J- ;b f" /: Li _e.*. ~,, I ,,~, ,:,,;:, Prepared by T. .I. Vitkus i,c Environmental Survey and Site Assessment Program Energy/Environment Systems Division ;>::; Oak Ridge Institute for Science and Education .,:, "Oak Ridge, Temressee 37831-0117 .F P ., ? :_ &,d ,,,, ;<:x,, Prepared for the 3 I. Office of Environmental Restoration I, U.S. Department of Energy i gy i. ~: ,,, "! ? ' :' : "' ,//, FINAL REPORT ".$ :,a ,,, MARCH 1995 ; m L ,, ,, ,,,. ., ,,. ' 1 jq ,Ij:,., .,~ _,I_ 1 This report is based on work performed under contract number DE-AC05-760R00033 with the

379

Site Sustainability Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S. Department of Energy U.S. Department of Energy Office of Legacy Management December 2013 LMS/S07225 This page intentionally left blank This page intentionally left blank U.S. Department of Energy Site Sustainability Plan December 2013 Doc. No. S07225 Page i Contents Abbreviations ................................................................................................................................. iii I. Executive Summary ...............................................................................................................1 II. Performance Review and Plan Narrative ...............................................................................9 1 GHG Reduction and Comprehensive GHG Inventory ...........................................................9

380

ENVIRONMENTAL MANAGEMENT SITE-SPECIFIC ADVISORY BOARD  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Washington, D.C. 20585 Washington, D.C. 20585 April 25, 2013 2 Environmental Management Site-Specific Advisory Board - April 25, 2013 Meeting Minutes LIST OF ACRONYMS AB - Advisory Board ANL - Argonne National Laboratory ARP - Accelerator Retrieval Project BNL - Brookhaven National Laboratory BRC - Blue Ribbon Commission CAB - Citizens Advisory Board D&D - Decontamination & Decommissioning DDFO - Deputy Designated Federal Officer DOE - Department of Energy DUF6 - Depleted Uranium Hexafluoride DWPF - Defense Waste Processing Facility EIS - Environmental Impact Statement EM - DOE Office of Environmental Management EM SSAB - DOE Office of Environmental Management Site-Specific Advisory Board EPA - U.S. Environmental Protection Agency FY - Fiscal Year

Note: This page contains sample records for the topic "rifle processing site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

1999 SITE ENVIRONMENTAL REPORT  

SciTech Connect

Throughout the scientific community, Brookhaven National Laboratory (BNL) is renowned for its leading-edge research in physics, medicine, chemistry, biology, materials, and the environment. BNL is committed to supporting its world-class scientific research with an internationally recognized environmental protection program. The 1999 Site Environmental Report (SER) summarizes the status of the Laboratory's environmental programs and performance, including the steady progress towards cleaning up the site and fully integrating environmental stewardship into all facets of the Laboratory's mission. BNL is located on 5,265 acres of pine barrens in Suffolk County in the center of Long Island, New York. The Laboratory is situated above a sole source aquifer at the headwaters of the Peconic River; therefore, protecting ground and surface water quality is a special concern. Approximately 3,600 acres of the site are undeveloped and serve as habitat for a wide variety of animals and plants, including one New York State endangered species, the tiger salamander, and two New York State threatened species, the banded sunfish and the stiff goldenrod. Monitoring, preserving, and restoring these ecological resources is a high priority for the Laboratory.

ENGEL-COX,J.; ZIMMERMAN,E.; LEE,R.; WILLIAMS,J.; GREEN,T.; PAQUETTE,D.; HOODA,B.; SCARPITTA,S.; GENZER,P.; ET AL

2000-09-01T23:59:59.000Z

382

Paraho oil shale module. Site development plan, Task 4  

SciTech Connect

A management plan and schedule which covers all requirements for gaining access to the site and for conducting a Paraho Process demonstration program have been prepared. The oil shale available should represent a regional resource of suitable size and quality for commercial development. Discussed in this report are: proof of ownership; requirements for rights-of-way for access to the site; local zoning restrictions; water rights; site availability verification; and other legal requirements. (DMC)

Not Available

1981-10-01T23:59:59.000Z

383

Independent Activity Report, Pantex Site Office - May 2011 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site Office - May 2011 Site Office - May 2011 Independent Activity Report, Pantex Site Office - May 2011 May 2011 Pantex Site Office Quality Assurance Survey [HIAR-PTX-2011-05-06] In coordination with the Pantex Site Office (PXSO), the Office of Health, Safety and Security (HSS) site lead participated in a National Nuclear Security Administration (NNSA)/PXSO Quality Assurance Survey (QAS 1) of the contractor's weapon quality program conducted May 2-5, 2011. The purpose of the QAS 1 survey was to examine how Babcock and Wilcox Technical Services Pantex, LLC (B&W Pantex) implements, monitors, and improves the Quality Management System and its implementing policies, processes, and procedures, as well as the level of compliance with the contractual requirements. Independent Activity Report, Pantex Site Office - May 2011

384

Piketon Site Partnering Agreement 2011 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Piketon Site Partnering Agreement 2011 Piketon Site Partnering Agreement 2011 Piketon Site Partnering Agreement 2011 On behalf of the taxpayers of this nation and the communities of the four counties surrounding the former Gaseous Diffusion Plant Site in Piketon, Ohio, we, the U.S. Department of Energy and its Prime Contractors, stand together as One Site Team. We enter into this Partnering Agreement with the conviction and shared responsibility to operate and clean up the Piketon Site safely and efficiently -- while protecting the public health and the environment. Piketon Site Partnering Agreement 2011 More Documents & Publications Oak Ridge Operations Office (ORO) & Wastren Advantage, Inc. (WAI) Partnering Agreement For The Transuranic Waste Processing Program Contractor Fee Payments - Portsmouth Paducah Project Office

385

Site selection for the installation of autonomous desalination systems (ADS)  

Science Journals Connector (OSTI)

The geographic location of a final site where an ADS unit can be installed has a strong influence on the success of that project. If the desalination unit is not located in the most favorable position, the competitive advantages of the process can be wiped out. Considerable care must be exercised in selecting the unit site, and many different factors must be considered. The aim of this work is to present amethodology to identify and select themost favorable sites to install ADS units. Collection of the basic data and evaluation are the essential steps for the identification of sites. The favorable sites can be screened based on the criteria developed in this work for the purpose of selecting the best apparent site. Scoring of the various criteria, when combined with the weighting system, establishes an overall ranked score for each site. A detailed description of the selection methodology will be presented.

F. Banat; V. Subiela; H. Qiblawey

2007-01-01T23:59:59.000Z

386

Process / CI Process  

NLE Websites -- All DOE Office Websites (Extended Search)

7 Post Travel Summary 11_0221 Page 1 of 3 7 Post Travel Summary 11_0221 Page 1 of 3 EOTA - Business Process Document Title: Post Travel Summary Document Number: ADMF-017 Post Travel Summary 11_0221 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: ADMP-004, Contractor Travel Process Notify of Changes: EOTA Staff Referenced Document(s): ADMF-007 EOTA Pre-Travel Authorization Form ADMF-017 Post Travel Summary 11_0221 Page 2 of 3 Revision History: Rev. Description of Change 11_0221 Initial Release ADMF-017 Post Travel Summary 11_0221 Page 3 of 3

387

Site Visit Report, Lawrence Livermore National Laboratory - May 2010 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site Visit Report, Lawrence Livermore National Laboratory - May Site Visit Report, Lawrence Livermore National Laboratory - May 2010 Site Visit Report, Lawrence Livermore National Laboratory - May 2010 May 2010 Review of Lawrence Livermore National Laboratory Fire Protection Design Review Process This review of the Lawrence Livermore National Laboratory (LLNL) Fire Protection Design Review Process, conducted on March 24 through April 2, 2010, was sponsored by the U.S. Department of Energy (DOE) Livermore Site Office (LSO) and conducted jointly with LSO staff. Overall, the design review process was observed to be effective and the LLNL programs for performing these reviews were being implemented. Many aspects of the process are effective, and the personnel who implement it are knowledgeable and experienced. This review identified only one

388

Ventilation System to Improve Savannah River Site's Liquid Waste Operations  

Energy.gov (U.S. Department of Energy (DOE))

AIKEN, S.C. The EM program and its liquid waste contractor at the Savannah River Site are improving salt waste disposition work and preparing for eventual operations of the Salt Waste Processing Facility (SWPF) currently being constructed.

389

Sample Documents for On-Site Renewable Power Purchase Agreements  

Energy.gov (U.S. Department of Energy (DOE))

The Federal Energy Management Program (FEMP) works with Federal agencies and partners to assemble sample documents from past on-site renewable power purchase agreement (PPA) projects to help streamline the PPA process.

390

Manhattan Project: How to Navigate this Site  

Office of Scientific and Technical Information (OSTI)

HOW TO NAVIGATE THIS SITE HOW TO NAVIGATE THIS SITE Resources > Navigation There are five main topical areas on this web site: Events, People, Places, Processes, and Science. These are further divided into sub-sections, each with its own introduction. The main topical areas can be accessed by clicking on a button on the horizontal bar above. Sub-sections can be accessed by clicking on a topic in the vertical column to your left. If you would like to begin with a quick survey of the Manhattan Project, try reading, in order, the eight Event sub-section pages, beginning with Atomic Discoveries, 1890s-1939. In addition to the main topical areas, the Resources section on the above button bar provides access to a variety of resource materials, including photos, documents, maps, and published histories.

391

ARM - Site Instruments  

NLE Websites -- All DOE Office Websites (Extended Search)

Central FacilityInstruments Central FacilityInstruments SGP Related Links Facilities and Instruments Central Facility Boundary Facility Extended Facility Intermediate Facility Radiometric Calibration Facility Geographic Information ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site Fact Sheet Images Information for Guest Scientists Contacts Instruments : Central Facility [ Single installation ] ACSM Aerosol Chemical Speciation Monitor Aerosols Browse Data [ Single installation ] AERI Atmospheric Emitted Radiance Interferometer Radiometric Browse Plots Browse Data [ Single installation ] AOS Aerosol Observing System Aerosols Browse Plots Browse Data [ Single installation ] BRS Broadband Radiometer Station Radiometric Browse Plots Browse Data [ Single installation ] BSRN Baseline Solar Radiation Network

392

Argonne Transportation Site Index  

NLE Websites -- All DOE Office Websites (Extended Search)

Student Competitions Technology Analysis Transportation Research and Analysis Computing Center Working With Argonne Contact TTRDC Site Index General Information About TTRDC Media Center Current News News Archive Photo Archive Transportation Links Awards Contact Us Interesting Links Working with Argonne Research Resources Experts Batteries Engines & Fuels Fuel Cells Management Materials Systems Assessment Technology Analysis Tribology Vehicle Recycling Vehicle Systems Facilities Advanced Powertrain Research Facility Powertrain Test Cell 4-Wheel Drive Chassis Dynamometer Battery Test Facility Engine Research Facility Fuel Cell Test Facility Tribology Laboratory Tribology Laboratory Photo Tour Vehicle Recycling Partnership Plant Publications Searchable Database: patents, technical papers, presentations

393

ARM - Site Instruments  

NLE Websites -- All DOE Office Websites (Extended Search)

AlaskaInstruments AlaskaInstruments NSA Related Links Facilities and Instruments Barrow Atqasuk ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site Images Information for Guest Scientists Contacts Instruments : North Slope Alaska [ Single installation ] AERI Atmospheric Emitted Radiance Interferometer Radiometric Browse Plots Browse Data [ Single installation ] AMC Ameriflux Measurement Component Radiometric, Surface/Subsurface Properties Browse Data [ Single installation ] AOS Aerosol Observing System Aerosols Browse Data [ Single installation ] CCN Cloud Condensation Nuclei Particle Counter Aerosols Browse Data [ Single installation ] CLAP Continuous Light Absorption Photometer Aerosols Browse Data [ Single installation ] CPC Condensation Particle Counter Aerosols Browse Data

394

ARM - Site Instruments  

NLE Websites -- All DOE Office Websites (Extended Search)

PlainsInstruments PlainsInstruments SGP Related Links Facilities and Instruments Central Facility Boundary Facility Extended Facility Intermediate Facility Radiometric Calibration Facility Geographic Information ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site Fact Sheet Images Information for Guest Scientists Contacts Instruments : Southern Great Plains [ Single installation ] ACSM Aerosol Chemical Speciation Monitor Aerosols Browse Data [ Installed at 5 facilities ] AERI Atmospheric Emitted Radiance Interferometer Radiometric Browse Plots Browse Data [ Single installation ] AOS Aerosol Observing System Aerosols Browse Plots Browse Data [ Single installation ] BRS Broadband Radiometer Station Radiometric Browse Plots Browse Data [ Single installation ] BSRN Baseline Solar Radiation Network

395

Hanford Site, Richland, Washington  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for the Environmental for the Environmental and Molecular Sciences Laboratory at the Hanford Site, Richland, Washington September 1992 U.S. Department of Energy Richland, Washington 99352 Contents 1 . 0 Summary . . 2.0 Purpose of and Need for the Proposed Action . . . . . . 3.0 Proposed Action and Alternatives . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.1 Proposed Action 3.2 Onsite Alternatives . . . . . . . . . . 3.3 Offsite Alternatives . . . . . . . . . 3.4 No Action Alternative ~ ~ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4.0 Affected Environment . . . . . . . . . . . 5.0 Environmental Impacts . . . . . . . . . . . 5.1 Construction Impacts 5.1.1 Atmospheric Impacts . . . . . . . . . . . . . . . . . . . . . . . . . 5.1.2 Terrestrial Impacts . 5.1.3 Impacts on CERCLA Remedial Actions . 5.1.4 Construction Accidents .

396

ARM - Site Instruments  

NLE Websites -- All DOE Office Websites (Extended Search)

PacificInstruments PacificInstruments TWP Related Links Facilities and Instruments Manus Island Nauru Island Darwin, AUS ES&H Guidance Statement Operations Science Field Campaigns Year of Tropical Convection Visiting the Site TWP Fact Sheet Images Information for Guest Scientists Contacts Instruments : Tropical Western Pacific [ Installed at 3 facilities ] AERI Atmospheric Emitted Radiance Interferometer Radiometric Browse Plots Browse Data [ Installed at 2 facilities ] CSAPR C-Band ARM Precipitation Radar Cloud Properties Browse Data [ Installed at 3 facilities ] CSPHOT Cimel Sunphotometer Aerosols, Radiometric Browse Data [ Single installation ] DISDROMETER Impact Disdrometer Surface Meteorology Browse Plots Browse Data [ Single installation ] DL Doppler Lidar Cloud Properties Browse Data [ Installed at 3 facilities ]

397

ARM - Site Instruments  

NLE Websites -- All DOE Office Websites (Extended Search)

Oliktok Point, Oliktok Point, AlaskaInstruments Oliktok Deployment AMF Home Oliktok Home Deployment Operations Baseline Instruments and Data Plots at the Archive Outreach News & Press New Sites Fact Sheet (PDF, 1.6MB) Images Contacts Fred Helsel, AMF Operations Lynne Roeder, Media Contact Hans Verlinde, Principal Investigator Instruments : Oliktok Point, Alaska [ Single installation ] AERI Atmospheric Emitted Radiance Interferometer Radiometric Not Online [ Single installation ] CSAPR C-Band ARM Precipitation Radar Cloud Properties Not Online [ Single installation ] CSPHOT Cimel Sunphotometer Aerosols Browse Data [ Single installation ] DL Doppler Lidar Cloud Properties Not Online [ Single installation ] ECOR Eddy Correlation Flux Measurement System Surface/Subsurface Properties Not Online [ Single installation ]

398

1994 Site Environmental Report  

SciTech Connect

The 1994 Site Environmental Report summarizes environmental activities at Lawrence Berkeley Laboratory (LBL) for the calendar year (CY) 1994. The report strives to present environmental data in a manner that characterizes the performance and compliance status of the Laboratory`s environmental management programs when measured against regulatory standards and DOE requirements. The report also discusses significant highlight and planning efforts of these programs. The format and content of the report are consistent with the requirements of the US Department of Energy (DOE) Order 5400.1, General Environmental Protection Program.

NONE

1995-05-01T23:59:59.000Z

399

Site Vice President  

E-Print Network (OSTI)

In response to your request for information (Reference 1), Vermont Yankee submits the attached NRC Form 536. Form 536 summarizes our projected site-specific operator licensing examination schedules, as well as the estimated number of applicants planning to take operator licensing examinations and the NRC's generic fundamentals examinations. There are no new regulatory commitments contained in this submittal. If you have any questions or require additional information, please contact our Operations Training Superintendent, Mr. Michael A. Romeo at (802) 258-4197. Sincerely,

Vermont Yankee; Vermont Yankee; Nuclear Power Station; Mr. Marvin; D. Sykes

2007-01-01T23:59:59.000Z

400

Preliminary siting characterization Salt Disposition Facility - Site B  

SciTech Connect

A siting and reconnaissance geotechnical program has been completed in S-Area at the Savannah River Site in South Carolina. This program investigated the subsurface conditions for the area known as ``Salt Disposition Facility (SDF), Site B'' located northeast of H-Area and within the S-Area. Data acquired from the Site B investigation includes both field exploration and laboratory test data.

Wyatt, D.

2000-01-04T23:59:59.000Z

Note: This page contains sample records for the topic "rifle processing site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Hanford Site Workers Meet Challenging Performance Goal at Plutonium Finishing Plant  

Energy.gov (U.S. Department of Energy (DOE))

RICHLAND, Wash. Safely and methodically, piece by piece, workers at the Hanford sites Plutonium Finishing Plant are surpassing goals for removing hazardous tanks once used in the plutonium production process.

402

Site action, environmental justice and an urban community: A unique approach at a Superfund site  

SciTech Connect

The US Environmental Protection Agency`s (EPA) project at the Diamond Alkali Superfund Site is an example of how technical, environmental justice, and community relations issues all affect actions at a Superfund Site. The Diamond Alkali Superfund Site is divided into two operable units. The site consists of the former pesticides manufacturing facility at 80 and 120 Lister Avenue in Newark, New Jersey, and the adjoining six mile reach of the Passaic River known as the ``Passaic River Study Area``. EPA has negotiated Consent Orders with the Potentially Responsible Party (PRP) to design and construct the selected containment remedy at the land-based properties, and to conduct the Remedial Investigation (RI) of the river under EPA oversight. Pesticides, dioxin, polychlorinated biphenyls (PCBs), metals and other hazardous substances have been found at the Site. Evidence indicates that the ecology of the Passaic River has been adversely impacted by the presence of these hazardous substances. The State of New Jersey issued a ban on the consumption of fish and crabs from affected sections of the Passaic River; yet reportedly, many residents still consume seafood from the river. Community relations at the Site had deteriorated because of the community`s lack of trust and loss of confidence in EPA. To address these issues, EPA has implemented an innovative public outreach program to improve how it communicates with racial minority and low-income communities living in the vicinity of the Site, and to involve them in the decision-making process.

Seppi, P.K.; Richman, L.R. [Environmental Protection Agency, New York, NY (United States). Region II; Wireman, J.M. [ICF Kaiser Engineers, Inc., Edison, NJ (United States)

1994-12-31T23:59:59.000Z

403

1996 Site environmental report  

SciTech Connect

The FEMP is a Department of Energy (DOE)-owned facility that produced high-quality uranium metals for military defense for nearly 40 years. DOE suspended production at the FEMP in 1989 and formally ended production in 1991. Although production activities have ceased, the site continues to examine the air and liquid pathways as possible routes through which pollutants from past operations and current remedial activities may leave the FEMP. The Site Environmental Report (SER) is prepared annually in accordance with DOE Order 5400.1, General Environmental Protection Program. This 1996 SER provides the general public as well as scientists and engineers with the results from the ongoing Environmental Monitoring Program. Also included in this report is information concerning the FEMP progress toward achieving full compliance with requirements set forth by DOE, U.S. Environmental Protection Agency (EPA), and Ohio EPA (OEPA). For some readers, the highlights provided in this Executive Summary may provide sufficient information. Many readers, however, may wish are presented here. All information presented in this summary is discussed more fully in the main body of this report.

NONE

1997-06-01T23:59:59.000Z

404

Harvard Forest Environmental Measurement Site  

E-Print Network (OSTI)

Harvard University #12;Site Descrip>on · Mixed hardwood and conifer forest · 40Harvard Forest Environmental Measurement Site Petersham, MA Evan Goldman interannual variability and long-term trends in fluxes and forest physiological responses

405

Hanford Blog Archive - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

September 2009 September 30, 2009 Hanford Workers Resume Cleanup of 200 North Area of the Hanford Site Hanford Workers Resume Cleanup of 200 North Area of the Hanford Site...

406

2010 SITE ENVIRONMENTAL REPORTiii Brookhaven National Laboratory (BNL) prepares an annual Site Environmental Report (SER)  

E-Print Network (OSTI)

that the Laboratory integrates DOE's five Core Functions and seven Guiding Principles into all work processes Site Environmental Report (SER) in accordance with DOE Order 231.1A, Environment, Safety and Health; compliance with applicable DOE, federal, state, and local regulations; and performance in restoration

407

2009 Site environmental reportiii Brookhaven National Laboratory (BNL) prepares an annual Site Environmental Report (SER)  

E-Print Network (OSTI)

that the Laboratory integrates DOE's five Core Functions and seven Guiding Principles into all work processes Site Environmental Report (SER) in accordance with DOE Order 231.1A, Environment, Safety and Health; compliance with applicable DOE, federal, state, and local regulations; and performance in restoration

408

Savannah River Sites Liquid Waste Operations Adds Multi-Functional Laboratory  

Energy.gov (U.S. Department of Energy (DOE))

AIKEN, S.C. A new multi-functional laboratory supporting high-level waste processing at the Savannah River Site (SRS) gives workers a new and improved place to provide back-up laboratory support and more space for chemical storage.

409

LIQUEFACTION EVALUATIONS AT DOE SITES  

Energy.gov (U.S. Department of Energy (DOE))

Liquefaction Evaluations at DOE Sites M. Lewis, M. McHood, R. Williams, B. Gutierrez October 25, 2011

410

Natural Gas Transmission Pipeline Siting Act (Florida) | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Natural Gas Transmission Pipeline Siting Act (Florida) Natural Gas Transmission Pipeline Siting Act (Florida) Natural Gas Transmission Pipeline Siting Act (Florida) < Back Eligibility Commercial Construction Developer Fed. Government Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Municipal/Public Utility Retail Supplier Rural Electric Cooperative Systems Integrator Tribal Government Utility Program Info State Florida Program Type Siting and Permitting Provider Florida Department of Environmental Protection This Act establishes a centralized and coordinated permitting process for the location of natural gas transmission pipeline corridors and the construction and maintenance of natural gas transmission pipelines. The Act intends to achieve a reasonable balance between the need for the natural

411

Independent Oversight Review, Savannah River Site Tritium Facilities -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Tritium Tritium Facilities - December 2012 Independent Oversight Review, Savannah River Site Tritium Facilities - December 2012 December 2012 Review of Site Preparedness for Severe Natural Phenomena Events at the Savannah River Site Tritium Facilities The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent review of preparedness for severe natural phenomena events (NPEs) at the National Nuclear Security Administration (NNSA) Savannah River Site's (SRS's) Tritium Facilities (TF). The HSS Office of Safety and Emergency Management Evaluations performed this review to evaluate the processes for identifying emergency response capabilities and maintaining them in a state of readiness in case of a severe NPE.

412

Oak Ridge Reservation Annual Site  

E-Print Network (OSTI)

Oak Ridge Reservation Annual Site Environmental Report DOE/ORO/2445 2012 #12;Cover Image Jeff Riggs Logistical Services Design Creative Media Communications Oak Ridge National Laboratory Oak Ridge Reservation Annual Site Environmental Report 2012 #12;DOE/ORO/2445 Oak Ridge Reservation Annual Site Environmental

Pennycook, Steve

413

Oak Ridge Reservation Annual Site  

E-Print Network (OSTI)

Oak Ridge Reservation Annual Site Environmental Report DOE/ORO-2473 2013 #12;Cover Image & Design Creative Media Communications Oak Ridge National Laboratory Oak Ridge Reservation Annual Site Environmental Report 2013 #12;DOE/ORO/2473 Oak Ridge Reservation Annual Site Environmental Report for 2013 on the World

Pennycook, Steve

414

Facility Siting and Layout Optimization Based on Process Safety  

E-Print Network (OSTI)

) that identifies potential layouts by minimizing overall costs. This approach gives the coordinates of each facility in a continuous plane, and estimates for the total length of pipes, the land area, and the selection of safety devices. Finally, the 3D...

Jung, Seungho

2012-02-14T23:59:59.000Z

415

Tanks Focus Area FY 1996 Site Needs Assessment  

SciTech Connect

The Tanks Focus Area`s (TFA`s) mission is to manage an integrated technology development program that results in the application of technology to safely and efficiently accomplish tank waste remediation across the US Department of Energy (DOE) complex. The TFA uses a systematic process for developing its annual program that draws from the tanks technology development needs expressed by four DOE tank waste sites--Hanford, Idaho, Oak Ridge, and Savannah River Sites. The process is iterative and involves four steps: (1) identify and validate tank technology needs at these four sites, (2) define a technical program that responds to these needs, (3) select specific tasks and schedules that accomplish program objectives, and (4) develop integrated teams to carry out selected tasks. This document describes the first of these four steps: identification of sites` tank technology needs. This step concentrates solely on needs identification, collection, and validation. Funding requirements and specific scope of responsive technical activities are not considered until later steps in program definition. This year, the collection and validation of site needs were accomplished through written input from the Site Technology Coordination Groups (STCGs). The TFA recognizes the importance of a continuing solid partnership with the sites through the STCG and DOE as well as contractor users and, therefore, ensured site participation and close coordination throughout the process.

NONE

1996-03-01T23:59:59.000Z

416

Completed Sites Listing  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hallam Nuclear Power Facility, NE Hallam Nuclear Power Facility, NE 1969 1998 2. Piqua Nuclear Power Facility, OH 1969 1998 3. Bayo Canyon, NM 1982 1998 4. Kellex/Pierpont, NJ 1982 1998 5. University of California, CA 1982 1998 6. Acid/Pueblo Canyons, NM 1984 1999 7. Chupadera Mesa, NM 1984 1999 8. Canonsburg, PA 1986 1999 9.Shiprock, NM 1987 2000 10. Middlesex Municipal Landfill, NJ 1987 2000 11. Niagara Falls Storage Site Vicinity Properties, NY 1987 2001 12. Salt Lake City, UT 1989 2001 13. Spook, WY 1989 2001 14. National Guard Armory, IL 1989 2002 15. University of Chicago, IL 1989 2005 16. Green River, UT 1990 2005 17. Lakeview, OR 1990 2006 18. Riverton, WY 1990 2006 19. Tuba City, AZ 1990 2006 20 Durango, CO 1991 2007 21. Lowman, ID 1992 2007 22. Pagano Salvage Yard, NM 1992 2007 23. Elza Gate, TN 1992 2007 24. Albany Research Center, OR

417

WASTE DISPOSITION PROJECT MAKES GREAT STRIDES AT THE IDAHO SITE |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WASTE DISPOSITION PROJECT MAKES GREAT STRIDES AT THE IDAHO SITE WASTE DISPOSITION PROJECT MAKES GREAT STRIDES AT THE IDAHO SITE WASTE DISPOSITION PROJECT MAKES GREAT STRIDES AT THE IDAHO SITE April 1, 2010 - 12:00pm Addthis An operator uses robotic manipulators to process RH TRU. An operator uses robotic manipulators to process RH TRU. Idaho - The Waste Disposition Project Team at the Department of Energy's Idaho Site has continued to keep its commitment to remove remote handled (RH) transuranic (TRU) waste out of Idaho, protecting the Snake River Plain Aquifer and keeping the Office of Environmental Management's commitment to environmental clean up. In 2007, the first shipment of RH TRU waste left the gates of the Idaho Site, headed to the Waste Isolation Pilot Plant (WIPP) for disposal. In the three years since, devoted individuals on the CH2M-WG, Idaho's (CWI)

418

WASTE DISPOSITION PROJECT MAKES GREAT STRIDES AT THE IDAHO SITE |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WASTE DISPOSITION PROJECT MAKES GREAT STRIDES AT THE IDAHO SITE WASTE DISPOSITION PROJECT MAKES GREAT STRIDES AT THE IDAHO SITE WASTE DISPOSITION PROJECT MAKES GREAT STRIDES AT THE IDAHO SITE April 1, 2010 - 12:00pm Addthis An operator uses robotic manipulators to process RH TRU. An operator uses robotic manipulators to process RH TRU. Idaho - The Waste Disposition Project Team at the Department of Energy's Idaho Site has continued to keep its commitment to remove remote handled (RH) transuranic (TRU) waste out of Idaho, protecting the Snake River Plain Aquifer and keeping the Office of Environmental Management's commitment to environmental clean up. In 2007, the first shipment of RH TRU waste left the gates of the Idaho Site, headed to the Waste Isolation Pilot Plant (WIPP) for disposal. In the three years since, devoted individuals on the CH2M-WG, Idaho's (CWI)

419

Florida Electrical Power Plant Siting Act (Florida) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electrical Power Plant Siting Act (Florida) Electrical Power Plant Siting Act (Florida) Florida Electrical Power Plant Siting Act (Florida) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Municipal/Public Utility Retail Supplier Rural Electric Cooperative Systems Integrator Tribal Government Utility Savings Category Buying & Making Electricity Solar Program Info State Florida Program Type Siting and Permitting Provider Florida Department of Environmental Protection The Power Plant Siting Act (PPSA) is the state's centralized process for licensing large power plants. One license-a certification- replaces local and state permits. Local governments and state agencies within whose jurisdiction the power plant is to be built participate in the process. For

420

Annual Site Environmental Reports (ASER)  

Energy.gov (U.S. Department of Energy (DOE))

Annual Site Environmental Reports (ASERs) are required by DOE O 231.1B. The ASERs provide important information needed by site managers and DOE Headquarters to assess field environmental program performance, site-wide environmental monitoring and surveillance effectiveness, and confirm compliance with environmental standards and requirements. They are also the means by which DOE sites demonstrate compliance with the radiological protection requirements of DOE O 458.1. In addition, ASERs are an important means of conveying DOE's environmental protection performance to stakeholders and members of the public living near DOE sites.

Note: This page contains sample records for the topic "rifle processing site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Process oil manufacturing process  

SciTech Connect

A method is described for producing a naphthenic process oil having reduced sulfur, nitrogen and polynuclear aromatics contents from a naphthenic feed containing same and having an atmospheric boiling range of about 650/sup 0/ to about 1200/sup 0/F. comprising: A. passing the feed into a first hydrotreating stage having a hydrotreating catalyst therein, the stage maintained at a temperature of about 600/sup 0/ to about 750/sup 0/F. and at a hydrogen partial pressure of about 400 to about 1500 psig, to convert at least a portion of the sulfur to hydrogen sulfide and the nitrogen to ammonia; B. passing the hydrotreated feed from the first hydrotreating stage in an intermediate stripping stage wherein hydrogen sulfide, ammonia, or both is removed; C. passing the hydrotreated feed from the intermediate stage into a second hydrotreating stage having therein a hydrotreating catalyst selected from the group consisting of nickel-molybdenum, cobalt-molybdenum, nickel-tungsten and mixtures thereof, the second hydrotreating stage maintained at a temperature lower than that of the first hydrotreating stage and at a hydrogen partial pressure ranging between about 400 and about 1,500 psig; D. monitoring the polynuclear aromatics content, the degree of saturation, or both of the product exiting the second hydrotreating stage; and, E. adjusting the temperature in the second hydrotreating stage to keep the polynuclear aromatics content, the degree of saturation, or both below a limit suitable for process oil.

Corman, B.G.; Korbach, P.F.; Webber, K.M.

1989-01-31T23:59:59.000Z

422

Categorical Exclusion Determinations: Los Alamos Site Office | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Los Alamos Site Office Los Alamos Site Office Categorical Exclusion Determinations: Los Alamos Site Office Categorical Exclusion Determinations issued by Los Alamos Site Office. DOCUMENTS AVAILABLE FOR DOWNLOAD July 16, 2013 Anthracite/Total Orange/Black Transfer of Contact-Handled Transuranic Waste to Idaho National Laboratory for Processing and Shipment to Waste Isolation Pilot Plant CX(s) Applied: B1.30 Date: 07/16/2013 Location(s): New Mexico Offices(s): Los Alamos Site Office November 30, 2012 CX-009798: Categorical Exclusion Determination Foreign Location Source Recovery - Fiscal Year 2013 CX(s) Applied: B2.6 Date: 11/30/2012 Location(s): New Mexico Offices(s): Los Alamos Site Office November 30, 2012 CX-009524: Categorical Exclusion Determination Foreign Location Source Recovery - Fiscal Year 2013

423

DOE - Office of Legacy Management -- Maywood Site - NJ 10  

Office of Legacy Management (LM)

Maywood Site - NJ 10 Maywood Site - NJ 10 FUSRAP Considered Sites Maywood, NJ Alternate Name(s): Maywood Chemical Works Maywood Chemical Company Maywood Interim Storage Site (MISS) Stepan Chemical Company NJ.10-2 NJ.10-3 NJ.10-7 NJ.10-11 Location: 100 West Hunter Avenue, Maywood/Rochelle Park, New Jersey NJ.10-4 Historical Operations: Processed monazite sands for extraction of rare earth compounds and mantle-grade thorium nitrates. NJ.10-2 NJ.10-3 NJ.10-4 NJ.10-5 Eligibility Determination: Eligible NJ.10-1 NJ.10-10 Radiological Survey(s): Assessment Surveys NJ.10-6 NJ.10-7 NJ.10-8 Site Status: Cleanup in progress by U.S. Army Corps of Engineers. NJ.10-9 NJ.10-13 USACE FUSRAP Long-term Care Requirements: To be determined upon completion. Also see FUSRAP Maywood Superfund Site

424

Tanks Focus Area (TFA) Site Needs Assessment FY 1999  

SciTech Connect

This report documents the process used by the Tanks Focus Area (TFA) to analyze and develop responses to technology needs submitted by five major U.S. Department of Energy (DOE) sites with radioactive tank waste problems, and the initial results of the analysis. The sites are the Hanford Site, Idaho National Engineering and Environmental Laboratory (INEEL), Oak Ridge Reservation (ORR), Savannah River Site (SRS), and West Valley Demonstration Project (WVDP). This is the fifth edition of the TFA site needs assessment. As with previous editions, this edition serves to provide the basis for accurately defining the TFA program for the upcoming fiscal year (FY), and adds definition to the program for up to 4 additional outyears. Therefore, this version distinctly defines the FY 2000 progrti and adds further definition to the FY 2001- FY 2004 program. Each year, the TFA reviews and amends its program in response to site users' science and technology needs.

RW Allen

1999-05-03T23:59:59.000Z

425

Mixed waste disposal facilities at the Savannah River Site  

SciTech Connect

The Savannah River Site (SRS) is a key installation of the US Department of Energy (DOE). The site is managed by DOE`s Savannah River Field Office and operated under contract by the Westinghouse Savannah River Company (WSRC). The Site`s waste management policies reflect a continuing commitment to the environment. Waste minimization, recycling, use of effective pre-disposal treatments, and repository monitoring are high priorities at the site. One primary objective is to safely treat and dispose of process wastes from operations at the site. To meet this objective, several new projects are currently being developed, including the M-Area Waste Disposal Project (Y-Area) which will treat and dispose of mixed liquid wastes, and the Hazardous Waste/Mixed Waste Disposal Facility (HW/MWDF), which will store, treat, and dispose of solid mixed and hazardous wastes. This document provides a description of this facility and its mission.

Wells, M.N.; Bailey, L.L.

1991-12-31T23:59:59.000Z

426

Independent Oversight Review, Paducah Site - April 2013 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Paducah Site - April 2013 Paducah Site - April 2013 Independent Oversight Review, Paducah Site - April 2013 April 2013 Review of Preparedness for Severe Natural Phenomena Events at the Paducah Site The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent review of the U.S. Department of Energy (DOE) Paducah site's preparedness for severe natural phenomena events (NPEs). The HSS Office of Safety and Emergency Management Evaluations performed this review to evaluate the processes for identifying emergency response capabilities and maintaining them in a state of readiness in case of a severe NPE. Independent Oversight Review, Paducah Site - April 2013 More Documents & Publications Independent Oversight Review, Portsmouth Gaseous Diffusion Plant -

427

FutureGen Industrial Alliance Announces Carbon Storage Site Selection  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FutureGen Industrial Alliance Announces Carbon Storage Site FutureGen Industrial Alliance Announces Carbon Storage Site Selection Process for FutureGen 2.0 FutureGen Industrial Alliance Announces Carbon Storage Site Selection Process for FutureGen 2.0 October 6, 2010 - 12:00am Addthis WASHINGTON -- The FutureGen Industrial Alliance today announced details of a process that will lead to the selection of an Illinois site for the storage of carbon dioxide (CO2) collected at FutureGen 2.0, a landmark project that will advance the deployment of carbon capture and storage technology at an Ameren Energy Resources power plant in Meredosia, Illinois. Last month the Department of Energy signed two agreements, one with the FutureGen Industrial Alliance and one with Ameren Energy Resources that committed $1 billion in Recovery Act funding to design, build and

428

NNSA Sites | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NNSA Sites NNSA Sites NNSA Sites Compliance agreements for National Nuclear Security Administration sites are listed here with accompanying summaries. Los Alamos National Laboratory Consent Agreement, December 10, 1993 Los Alamos National Laboratory Consent Agreement, December 10, 1993 Summary Los Alamos National Laboratory Compliance Order, October 4, 1995 Los Alamos National Laboratory Compliance Order, October 4, 1995 Summary South Valley Compliance Agreement South Valley Compliance Agreement Summary Mutual Consent Agreement for Storage of LDR, January 6, 1994 Mutual Consent Agreement for Storage of LDR, January 6, 1994 Summary Nevada Test Site FFCA Consent Order, March 27, 1996 Nevada Test Site FFCA Consent Order, March 27, 1996 Summary Nevada Test Site FFCA Consent Order, May 10, 1996

429

Building & Site Services Coordination  

NLE Websites -- All DOE Office Websites (Extended Search)

FAQs FAQs Conference Center and APS Site Activity Coordination Management and/or Coordination of APS Site Work/Services Safety & Emergency Management Database Maintenance Personnel Building and Site Services Coordination "We're at the End of our Pagers" The mission of the Building & Site Services Coordination is to efficiently manage and minimize the impact of APS building and site activities and to provide optimal support to APS staff and users in all 400 buildings and areas. FAQs Conference Center and APS Site Activity Coordination Locations Reservations Setups Visits & Tours Management and/or Coordination of APS Site Work/Services Work Entry Clearances Utility Shutdowns Telephone System Rigging Stockroom Office Furniture Installation Safety & Emergency Management

430

Salt Waste Processing Initiatives  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Patricia Suggs Patricia Suggs Salt Processing Team Lead Assistant Manager for Waste Disposition Project Office of Environmental Management Savannah River Site Salt Waste Processing Initiatives 2 Overview * Current SRS Liquid Waste System status * Opportunity to accelerate salt processing - transformational technologies - Rotary Microfiltration (RMF) and Small Column Ion Exchange (SCIX) - Actinide Removal Process/Modular Caustic Side Solvent Extraction (ARP/MCU) extension with next generation extractant - Salt Waste Processing Facility (SWPF) performance enhancement - Saltstone enhancements * Life-cycle impacts and benefits 3 SRS Liquid Waste Total Volume >37 Million Gallons (Mgal) Total Curies 183 MCi (51% ) 175 MCi (49% ) >358 Million Curies (MCi) Sludge 34.3 Mgal (92% ) 3.0 Mgal (8%)

431

Observational Approach to Chromium Site Remediation - 13266  

SciTech Connect

Production reactors at the U.S. Department of Energy's (DOE) Hanford Site in Richland, Washington, required massive quantities of water for reactor cooling and material processing. To reduce corrosion and the build-up of scale in pipelines and cooling systems, sodium dichromate was added to the water feedstock. Spills and other releases at the makeup facilities, as well as leaks from miles of pipelines, have led to numerous areas with chromium-contaminated soil and groundwater, threatening fish populations in the nearby Columbia River. Pump-and-treat systems have been installed to remove chromium from the groundwater, but significant contamination remain in the soil column and poses a continuing threat to groundwater and the Columbia River. Washington Closure Hanford, DOE, and regulators are working on a team approach that implements the observational approach, a strategy for effectively dealing with the uncertainties inherent in subsurface conditions. Remediation of large, complex waste sites at a federal facility is a daunting effort. It is particularly difficult to perform the work in an environment of rapid response to changing field and contamination conditions. The observational approach, developed by geotechnical engineers to accommodate the inherent uncertainties in subsurface conditions, is a powerful and appropriate method for site remediation. It offers a structured means of quickly moving into full remediation and responding to the variations and changing conditions inherent in waste site cleanups. A number of significant factors, however, complicate the application of the observational approach for chromium site remediation. Conceptual models of contamination and site conditions are difficult to establish and get consensus on. Mid-stream revisions to the design of large excavations are time-consuming and costly. And regulatory constraints and contract performance incentives can be impediments to the flexible responses required under the observational approach. The WCH project team is working closely with stakeholders and taking a number of steps to meet these challenges in a continuing effort to remediate chromium contaminated soil in an efficient and cost-effective manner. (authors)

Scott Myers, R. [Washington Closure Hanford, 2620 Fermi, Richland, Washington 99354 (United States)] [Washington Closure Hanford, 2620 Fermi, Richland, Washington 99354 (United States)

2013-07-01T23:59:59.000Z

432

OFF-SITE S  

Office of Legacy Management (LM)

S S e T B ~ I L L ~ C E ACTIVITIES OF THE NATIONAL E N V I R O N M E N T A L R E S E A R C H CENTER from July through December 197C / t i o n a l Environmental Research Centeq U. S. ~ ~ I R O N M E L S T P ~ TR~ECTIQN AGENCY e Unders tancling No. 23 (26-1)-539 for the U. S o ATOMIC ENERGY COlQ4ISSION OFF-SITE SURVEILLANCE ACTIVITIES OF THE NATIONAL E N V I R O N M E N T A L RESEARCH CENTER from July through December 197C by Monitoring Operations Laboratory National Environmental Research Center U. S. ENVIRONMENTAL P R O T E C T I O N AGENCY Las Vegas , Nevada Published February 1974 This work performed under a Memorandum of Understanding No. AT (26-1)-539 for the U . S. A T O M I C ENERGY C O M M I S S I O N ABSTRACT During t h e period J u l y through December 1970, s i x announced underground n u c l e a r tests were conducted a t t h e Nevada T

433

E-Print Network 3.0 - acid sites evolving Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

Program Summary: the aptamer will evolve) is sandwiched between two complementary primer binding sites in a stemloop... and evolution of nucleic acids (a process known as in...

434

E-Print Network 3.0 - accept site investigations Sample Search...  

NLE Websites -- All DOE Office Websites (Extended Search)

Fossil Fuels ; Geosciences 10 THE RELATIONSHIP BETWEEN THE RADIATION SURVEY AND SITE INVESTIGATION PROCESS, THE CERCLA REMEDIAL OR REMOVAL Summary: APPENDIX F THE RELATIONSHIP...

435

IDAHO SITE TO PROVIDE WASTE TREATMENT FOR OTHER DOE SITES  

NLE Websites -- All DOE Office Websites (Extended Search)

be sent to INL for treatment and characterization: the Argonne National Laboratory; Bettis Atomic Power Laboratory; General Electric Vallecitos Nuclear Center; the Hanford Site;...

436

Umatilla Satellite and Release Sites Project : Final Siting Report.  

SciTech Connect

This report presents the results of site analysis for the Umatilla Satellite and Release Sites Project. The purpose of this project is to provide engineering services for the siting and conceptual design of satellite and release facilities for the Umatilla Basin hatchery program. The Umatilla Basin hatchery program consists of artificial production facilities for salmon and steelhead to enhance production in the Umatilla River as defined in the Umatilla master plan approved in 1989 by the Northwest Power Planning Council. Facilities identified in the master plan include adult salmon broodstock holding and spawning facilities, facilities for recovery, acclimation, and/or extended rearing of salmon juveniles, and development of river sites for release of hatchery salmon and steelhead. The historic and current distribution of fall chinook, summer chinook, and coho salmon and steelhead trout was summarized for the Umatilla River basin. Current and future production and release objectives were reviewed. Twenty seven sites were evaluated for the potential and development of facilities. Engineering and environmental attributes of the sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

Montgomery, James M.

1992-04-01T23:59:59.000Z

437

Hanford Site Shares Lessons Learned in Retrieving Highly Radioactive Material  

Energy.gov (U.S. Department of Energy (DOE))

RICHLAND, Wash. EMs Richland Operations Office (Richland) and its contractor, CH2M HILL Plateau Remediation Company (CH2M HILL), welcomed staff from the Oak Ridge Office of Environmental Management Transuranic (TRU) waste processing team in Tennessee to the Hanford site recently to share lessons learned in the retrieval and processing of highly radioactive material, called sludge.

438

Site characterization plan: Yucca Mountain site, Nevada research and development area, Nevada: Consultation draft, Nuclear Waste Policy Act: Volume 1  

SciTech Connect

The Yucca Mountain site in Nevada is one of three candidate sites for the first geologic repository for radioactive waste. On May 28, 1986, it was recommended for detailed study in a program of site characterization. This site characterization plan (SCP) has been prepared in acordance with the requirements of the Nuclear Waste Policy Act to summarize the information collected to date about the geologic conditions at the site;to describe the conceptual designs for the repository and the waste package and to present the plans for obtaining the geologic information necessary to demonstrate the suitability of the site for a repository, to design the repository and the waste package, to prepare an environmental impact statement, and to obtain from the US Nuclear Regulatory Commission (NRC) an authorization to construct the repository. This introduction begins with a brief section on the process for siting and eveloping a repository, followed by a discussion of the pertinent legislation and regulations. A description of site characterization is presented next;it describes the facilities to be constructed for the site characterization program and explains the principal activities to be conducted during the program. Finally, the purpose, content, organizing prinicples, and organization of this site characterization plan are outlined, and compliance with applicable regulations is discussed. 880 refs., 130 figs., 25 tabs.

NONE

1988-01-01T23:59:59.000Z

439

Site characterization plan: Yucca Mountain site, Nevada research and development area, Nevada: Consultation draft, Nuclear Waste Policy Act: Volume 4  

SciTech Connect

The Yucca Mountain site in Nevada is one of three candidate sites for the first geologic repository for radioactive waste. On May 28, 1986, it was recommended and approved by the President for detailed study in a program of site characterization. This site characterization plan (SCP) has been prepared in accordance with the requirements of the Nuclear Waste Policy Act to summarize the information collected to date about the geologic conditions at the site; to describe the conceptual designs for the repository and the waste package; and to present the plans for obtaining the geologic information necessary to demonstate the suitability of the site for a repository, to desin the repository and the waste package, to prepare an environmental impact statement, and to obtain from the US Nuclear Regulatory Commission (NRC) an authorization to construct the repository. This introduction begins with a brief section on the process for siting and developing a repository, followed by a discussion of the pertinent legislation and regulations. A description of site characterization is presented next; it describes the facilities to be constructed for the site characterization program and explains the principal activities to be conducted during the program. Finally, the purpose, content, organizing principles, and organization of this site characterization plan are outlined, and compliance with applicable regulations is discussed.

NONE

1988-01-01T23:59:59.000Z

440

Redesigned ORNL DAAC Web Site  

NLE Websites -- All DOE Office Websites (Extended Search)

released a major revision to its Web site on Thursday, released a major revision to its Web site on Thursday, May 27, 2010. The new site includes many enhancements aimed at helping users locate and obtain data products and services. The simplified menu bar allows users to navigate quickly to products and services of interest and to access data through a variety of tools. The DAAC's Web site address remains unchanged (http://daac.ornl.gov), and as always, our products and services are available free of charge. Please note that your user account information will work on the new Web site. The Sign-in and Registration pages have a different look and will accept your email address as the User Name and retain your current password. If you have any problems accessing, signing-in, or registering with our new Web site, please contact our User Services Office, at +1 (865) 241-3952, or

Note: This page contains sample records for the topic "rifle processing site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Moab Site | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Moab Site Moab Site Moab Site Two scrapers work together to excavate Mancos Shale at the Crescent Junction site to create the second portion of a disposal cell for uranium mill tailings Two scrapers work together to excavate Mancos Shale at the Crescent Junction site to create the second portion of a disposal cell for uranium mill tailings One of two gantry cranes that load and unload tailings containers from the railcars is pictured on the hillside rail bench west of Moab One of two gantry cranes that load and unload tailings containers from the railcars is pictured on the hillside rail bench west of Moab Two scrapers work together to excavate Mancos Shale at the Crescent Junction site to create the second portion of a disposal cell for uranium mill tailings One of two gantry cranes that load and unload tailings containers from the railcars is pictured on the hillside rail bench west of Moab

442

SSA Old Jack Pine Site  

NLE Websites -- All DOE Office Websites (Extended Search)

SSA-OJP) SSA-OJP) View an aerial photo-map of the SSA-OJP site. The road to the OJP site The flux tower and the hut The truss tower connected to the flux tower by cables The flux tower< The canopy access tower The SRC meteorology tower The under-canopy flux station The moss-covered jack pine tree The ground cover at the OJP site Aerial view of the SSA-Old Jack Pine site looking to the northeast. The Flux Tower at SSA-Old Jack Pine site. The Sodar site. The NOAA sodar located near the Old Jack Pine in the SSA. The under-canopy radiation track This is a 14 meter-long metal track in the forest with a mobile radiometer out on an arm on a small motorized cart (visible at the center of the picture) that travels through the forest taking measurements of PAR and net radiation.

443

Closure Sites | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Closure Sites Closure Sites Closure Sites View a list of the compliance agreements for the many EM closure sites, such as Mound and Rocky Flats, below. Associated summaries are also included. Pinellas Remediation Agreement Pinellas Remediation Agreement Summary Maxey Flats Consent Decree -Part 1, April 18, 1996 Maxey Flats Consent Decree -Part 2, April 18, 1996 Maxey Flats Consent Decree April 18, 1996 Summary Monticello Mill site Federal Facility Agreement, December 22, 1988 Monticello Mill site Federal Facility Agreement, December 22, 1988 Summary Battelle Columbus Laboratories Director's Final Findings and Orders, October 4, 1995 Battelle Columbus Laboratories Director's Final Findings and Orders, October 4, 1995 Summary Fernald Environmental Management Project Consent Agreement and Final Order,

444

Process Deviation  

NLE Websites -- All DOE Office Websites (Extended Search)

0 Process Deviation 11_0304 Page 1 of 6 0 Process Deviation 11_0304 Page 1 of 6 EOTA - Business Process Document Title: Process Deviation Document Number: P-010 Rev 11-0304 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: Q-001, Quality Manual Notify of Changes: EOTA Employees Referenced Document(s): F-013 Process Deviation Form, P-008 Corrective/Preventive Action, F-014 Process Deviation Log, ADMP-001 Procurement Process P-010 Process Deviation 11_0304 Page 2 of 6 Revision History: Rev. Description of Change A Initial Release 08_0822 Process assigned to new owner. Process and flowchart modified to require completion of all items on F-013. 09_0122 Process and flowchart modified to reflect process modifications.

445

Transition of Sites from Environmental Management Memorandum...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transition of Sites from Environmental Management Memorandum of Understanding Transition of Sites from Environmental Management Memorandum of Understanding Transition of Sites from...

446

2014 Site Sustainability Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2014 Site Sustainability Plan 2014 Site Sustainability Plan The purpose of this Site Sustainability Plan (SSP) is to outline the strategies for managing, funding, and implementing...

447

Site Environmental Report for 2008, Volume II  

E-Print Network (OSTI)

Page SW-2 Site Environmental Report for 2008 StormwaterPage SD-1 Site Environmental Report for 2008 SedimentNational Laboratory Site Environmental Report for 2008

Lackner, Regina

2009-01-01T23:59:59.000Z

448

DOE - Office of Legacy Management -- Tatum Salt Dome Test Site...  

Office of Legacy Management (LM)

Tatum Salt Dome Test Site - MS 01 FUSRAP Considered Sites Site: Tatum Salt Dome Test Site (MS.01) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site...

449

DOE - Office of Legacy Management -- Belfield Mill Site - ND...  

Office of Legacy Management (LM)

Belfield Mill Site - ND 0-01 FUSRAP Considered Sites Site: Belfield Mill Site (ND.0-01 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site...

450

DOE - Office of Legacy Management -- EFB White Mesa Site - 033  

Office of Legacy Management (LM)

EFB White Mesa Site - 033 FUSRAP Considered Sites Site: EFB White Mesa Site (033 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition:...

451

Chernobyls waste site  

SciTech Connect

An analysis of the prospects for using the Chernobyl exclusion zone for development of a spent fuel store, waste disposal site and other nuclear facilities.

Schmieman, Eric A.; Paskevych, Sergiy; Sizov, Andrey; Batiy, Valeriy

2007-02-15T23:59:59.000Z

452

Hanford Blog Archive - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Department of Ecology, Tribal Nations, stakeholders, and the general public to define the vision for cleaning up the center of the Hanford Site. October 21, 2009 Hanford Update...

453

Power Services Site Navigation Menus  

NLE Websites -- All DOE Office Websites (Extended Search)

Contact Information Power Services home page PBL banner with photos of Bonneville dam and wind turbines Power Services Site Navigation Menus Instructions: Click on (or tab to) a...

454

Untitled Page -- Considered Sites Summary  

Office of Legacy Management (LM)

STATE UNIVERSITY (Columbus, Ohio) CATALYTIC CO. (Philadelphia, Pennsylvania) CENTER FOR ENERGY AND ENVIRONMENTAL RESEARCH (MAYAGUAZ, Puerto Rico) CENTRAL NEVADA TEST SITE...

455

Hanford Web Site What's New  

NLE Websites -- All DOE Office Websites (Extended Search)

Whatsnew Hanford Web Site What's New DOE-ORP Prime Contracts http:www.hanford.govpage.cfmDOE-ORPPrimeContracts Bechtel National, Inc. (BNI)- Design, construction,...

456

AMH Web Site What's New  

NLE Websites -- All DOE Office Websites (Extended Search)

Whatsnew AMH Web Site What's New Health News & InsideOut Newsletter http:www.hanford.govhealthpage.cfmnewsletter InsideOut Newsletter: 2015 Edition February 2015 Issue II...

457

Hanford Blog Archive - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

April 2009 April 28, 2009 DOE Selects Mission Support Alliance, LLC for Mission Support Contract at its Hanford Site DOE Selects Mission Support Alliance, LLC for Mission Support...

458

Yesterday's Daily Summary - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Station Real Time Met Data from Around the Site Current HMS Observations Daily HMS Extremes in Met Data Met and Climate Data Summary Products Historical Weather Charts Contacts...

459

Current Month Summary - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Station Real Time Met Data from Around the Site Current HMS Observations Daily HMS Extremes in Met Data Met and Climate Data Summary Products Historical Weather Charts Contacts...

460

Current HMS Observations - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Station Real Time Met Data from Around the Site Current HMS Observations Daily HMS Extremes in Met Data Met and Climate Data Summary Products Contacts Hours Current NWS...

Note: This page contains sample records for the topic "rifle processing site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Daily Normal Precipitation - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Station Real Time Met Data from Around the Site Current HMS Observations Daily HMS Extremes in Met Data Met and Climate Data Summary Products Historical Weather Charts Contacts...

462

Seasonal Average Temperature - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Station Real Time Met Data from Around the Site Current HMS Observations Daily HMS Extremes in Met Data Met and Climate Data Summary Products Historical Weather Charts Contacts...

463

Hanford Meteorological Station - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Station Real Time Met Data from Around the Site Current HMS Observations Daily HMS Extremes in Met Data Met and Climate Data Summary Products Contacts Hours Current NWS...

464

Forensic Sites | The Ames Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

Forensic Sites Meetings, Conferences, and Short Courses MFRC Training Calendar Reports of Interest NAS Report A Guide for Forensic Science Laboratories, Educational Institutions...

465

Processing Science  

NLE Websites -- All DOE Office Websites (Extended Search)

Processing Science Related to the Electron Beam Melting Additive Manufacturing Process October 14 th , 2014 Ryan Dehoff Metal Additive Manufacturing Thrust Lead Manufacturing...

466

DOE - Office of Legacy Management -- Separations Process Research Unit -  

NLE Websites -- All DOE Office Websites (Extended Search)

Separations Process Research Unit - Separations Process Research Unit - 024 FUSRAP Considered Sites Site: Separations Process Research Unit (024) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: This facility was constructed and operated by the Atomic Energy Commission as a pilot plant for developing and testing the chemical processes to extract both uranium and plutonium from irradiated fuel. Through Fiscal Year 1999 the Department of Energy's Office of Naval Reactors performed surveillance and maintenance activities. In Fiscal Year 2000, a contract was initiated to begin the characterization of the facilities. This will be

467

Nevada Test Site Environmental Report 2005, Attachment A - Site Description  

SciTech Connect

This appendix to the ''Nevada Test Site Environmental Report 2005'', dated October 2006 (DOE/NV/11718--1214; DOE/NV/25946--007) expands on the general description of the Nevada Test Site (NTS) presented in the Introduction. Included are subsections that summarize the site?s geological, hydrological, climatological, and ecological setting. The cultural resources of the NTS are also presented. The subsections are meant to aid the reader in understanding the complex physical and biological environment of the NTS. An adequate knowledge of the site's environment is necessary to assess the environmental impacts of new projects, design and implement environmental monitoring activities for current site operations, and assess the impacts of site operations on the public residing in the vicinity of the NTS. The NTS environment contributes to several key features of the site which afford protection to the inhabitants of adjacent areas from potential exposure to radioactivity or other contaminants resulting from NTS operations. These key features include the general remote location of the NTS, restricted access, extended wind transport times, the great depths to slow-moving groundwater, little or no surface water, and low population density. This appendix complements the annual summary of monitoring program activities and dose assessments presented in the main body of this report.

Cathy A. Wills

2006-10-01T23:59:59.000Z

468

Site transition framework for long-term surveillance and maintenance  

SciTech Connect

This document provides a framework for all U.S. Department of Energy (DOE) facilities and sites where DOE may have anticipated long-term surveillance and maintenance (LTSM) responsibilities. It is a tool to help facilitate a smooth transition from remediation to LTSM, providing a systematic process for affected parties to utilize in analyzing the baseline to understand and manage the actions from EM mission completion through a sites transition into LTSM. The framework is not meant to provide an exhaustive list of the specific requirement and information that are needed. Sites will have unique considerations that may not be adequately addressed by this tool, and it is anticipated that a team comprised of the transferring and receiving organization will use judgment in utilizing this augmenting with other DOE guidance. However the framework should be followed to the extent possible at each site; and adapted to accommodate unique site-specific requirements, needs, and documents. Since the objective of the tool is facilitate better understanding of the conditions of the site and the actions required for transfer, the transition team utilizing the checklist is expected to consult with management of both the receiving and transferring organization to verify that major concerns are addressed. Ideally, this framework should be used as early in the remediation process as possible. Subsequent applications of the Site Transition Framework (STF) to the site should be conducted periodically and used to verify that all appropriate steps have been or will be taken to close-out the site and that actions by both organization are identified to transfer the site to LTSM. The requirements are provided herein.

none,

2014-04-01T23:59:59.000Z

469

Annual update for the Nevada Test Site site treatment plan  

SciTech Connect

This document describes the purpose and scope of the Draft Annual Update for the Nevada Test Site Treatment Plan, the framework for developing the Annual Update, and the current inventory of mixed waste covered under the Site Treatment Plan and the Federal Facility Compliance Act Consent Order and stored at the Nevada Test Site. No Site Treatment Plan milestones or Federal Facility Cleanup Act Consent Order deadlines have been missed for fiscal year 1996. The Shipping Cask, a portion of the solvent sludge waste stream, and eight B-25 boxes from the lead-contaminated soil waste stream have been deleted from the Site Treatment Plan and the Federal Facility Cleanup Act Consent Order, in accordance with Part XI of the Federal Facility Cleanup Act Consent Order.

NONE

1997-04-01T23:59:59.000Z

470

TO: FILE SITE  

Office of Legacy Management (LM)

c)&a sw&?u da r/dwl&e c)&a sw&?u da r/dwl&e ALTERNATE NAME: NAME: --------------------------------------- CITY: 79lA% lo -------------------------- STATE: TYPE OF OPERATION -------------_--_ D Research & Development 0 Production scale tasting ench Scale Process 0 Theoretical Studies 0 Sample & Analysis 0 Facility Typo * Manuf actul 0 Universijt 0 Reaearcti I 0 Governmfn Cl Other ---. 0 Production p Disposal/Staraqe cwQ @oa&' y, a( L:& 0 Prime 0 Subcontract& cl Other i nf ormi 0 Purchase Order + fixed fed, time & mat&: I ---------____ I Contract/Purchase Order # ---------____ I -----------------------------. CONTRACTING PERIOD: -~~----___----_--_ ----------------------------------. OWNERSHiP: AK/PIED AECMED GOVT GOUT CON: !%!E!? EASE!? o_w!!!z? LESE!?

471

TO: FILE SITE NAME:  

Office of Legacy Management (LM)

NAME: NAME: f REBP\c E, +a.%# FLIP de\, 3;: Mh.wJ FlLLtJvl b G, ALTERNATE -------.------- NAME: -----------------__ 5 83 ihv.s:, p-de, a.<- NJe w ---------_ I I 0!9!!5_RL_s~ past: Fdr.-C Fin d- Current: ------------------------ ~~~~-----------___________ Owner contacted q yes po; if yee, date contacted ______ TYPE OF OPERATION ~_----~------____ pr Research & Development 0 Production scale testing Cl Pilot Scale 0 Bench Scale Process a Theoretical Studies a Sample & Analysis 0 Production 0 Disposal/Storage a Facility Type 3 Manufacturing q University 0 Research Organization fJ Government Sponsored Facility 0 Other --------------------- q Prime a a Subcontract& Other information (i.e., cost + fixed fee, unit price, Cl Purchase Order time b material, qtc) _

472

ARM - Site Instruments  

NLE Websites -- All DOE Office Websites (Extended Search)

FacilityInstruments FacilityInstruments AAF Information Proposal Process Science (PDF) Baseline Instruments Campaign Instruments Instrumentation Workshop 2008 AAF Fact Sheet G-1 Fact Sheet Images Field Campaigns AAF Campaigns 2007 - UAV Campaigns 1993 - 2006, 2015 Other Aircraft Campaigns 1993 - 2010 AAF Contacts Rickey Petty DOE AAF Program Director Beat Schmid Technical Director AAF Baseline Instruments The following instruments represent available capabilities. The needs of each field campaign will be assessed and additional instruments may be added upon request. For a list of past campaign instruments and their data, see the Airborne Observations instruments. Examples of cabin configurations for the G-1 from past and upcoming campaigns are also available. Payload Example from 2010 Payload Example from 2010

473

2010 Site Environmental Report  

SciTech Connect

Brookhaven National Laboratory (BNL) prepares an annual Site Environmental Report (SER) in accordance with DOE Order 231.1A, Environment, Safety and Health Reporting of the U.S. Department of Energy. The report is written to inform the public, regulators, employees, and other stakeholders of the Laboratory's environmental performance during the calendar year in review. Volume I of the SER summarizes environmental data; environmental management performance; compliance with applicable DOE, federal, state, and local regulations; and performance in restoration and surveillance monitoring programs. BNL has prepared annual SERs since 1971 and has documented nearly all of its environmental history since the Laboratory's inception in 1947. Volume II of the SER, the Groundwater Status Report, also is prepared annually to report on the status of and evaluate the performance of groundwater treatment systems at the Laboratory. Volume II includes detailed technical summaries of groundwater data and its interpretation, and is intended for internal BNL users, regulators, and other technically oriented stakeholders. A brief summary of the information contained in Volume II is included in Chapter 7, Groundwater Protection, of this volume. Both reports are available in print and as downloadable files on the BNL web page at http://www.bnl.gov/ewms/ser/. An electronic version on compact disc is distributed with each printed report. In addition, a summary of Volume I is prepared each year to provide a general overview of the report, and is distributed with a compact disc containing the full report. BNL is operated and managed for DOE's Office of Science by Brookhaven Science Associates (BSA), a partnership formed by Stony Brook University and Battelle Memorial Institute. For more than 60 years, the Laboratory has played a lead role in the DOE Science and Technology mission and continues to contribute to the DOE missions in energy resources, environmental quality, and national security. BNL manages its world-class scientific research with particular sensitivity to environmental issues and community concerns. The Laboratory's motto, 'Exploring Life's Mysteries...Protecting its Future,' and its Environmental, Safety, Security and Health Policy reflect the commitment of BNL's management to fully integrate environmental stewardship into all facets of its mission and operations.

Ratel, K.; Lee, R; Remien, J; Hooda, B; Green, T; Williams, J; Pohlot, P; Dorsch, W; Paquette, D; Burke, J

2011-10-01T23:59:59.000Z

474

Site and facility transportation services planning documents  

SciTech Connect

The Office of Civilian Radioactive Waste Management (OCRWM) will eventually ship Purchasers' (10 CFR 961.3) spent nuclear fuel from approximately 122 commercial nuclear facilities. The preparation and processing of Site and Facility Specific Transportation Services Planning Documents (SPDs) and Site Specific Servicing Plans (SSSPs) provides a focus for advanced planning and the actual shipping of waste, as well as the overall development of transportation requirements for the waste transportation system. SPDs will be prepared for each of the affected nuclear waste facilities over the next 2 years with initial emphasis on facilities likely to be served during the earliest years of the Federal Waste Management System (FWMS) operations. 3 figs., 1 tab.

Ratledge, J.E. (Oak Ridge National Lab., TN (USA)); Danese, L.; Schmid, S. (Science Applications International Corp., Oak Ridge, TN (USA))

1990-01-01T23:59:59.000Z

475

Savannah River Site Environmental Implementation Plan  

SciTech Connect

Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

Not Available

1989-08-01T23:59:59.000Z

476

Site & Facility Restoration | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Restoration Restoration Site & Facility Restoration Deactivation & Decommissioning (D&D) Deactivation and Decommissioning (D&D) is the process of taking an active/excess/abandoned facility to a final disposition end state. Because of residual radioactivity, other hazardous constituents, and the physical condition of EM's facilities, D&D presents unique hazards that must be addressed from a safety, programmatic, environmental, and technological standpoint. Read more Soil & Groundwater Remediation The U.S. Department of Energy (DOE) manages the largest groundwater and soil remediation effort in the world. The inventory at the DOE sites includes 6.5 trillion liters of contaminated groundwater, an amount equal to about four times the daily U.S. water consumption, and 40 million cubic

477

4-1 2001 SITE ENVIRONMENTAL REPORT CHAPTER 4: AIR QUALITY  

E-Print Network (OSTI)

4-1 2001 SITE ENVIRONMENTAL REPORT CHAPTER 4: AIR QUALITY 2001 SITE ENVIRONMENTAL REPORT Air monitoring program, routine environmental air sampling is conducted to verify local air quality and to assess;2001 SITE ENVIRONMENTAL REPORT CHAPTER 4: AIR QUALITY 4-2 Target Processing Lab Central Steam Facility 0 100

Homes, Christopher C.

478

EIS-0111: Remedial Actions at the Former Vanadium Corporation of America Uranium Mill Site, Durango, La Plata County, Colorado  

Energy.gov (U.S. Department of Energy (DOE))

The U.S. Department of Energy developed this statement to evaluate the environmental impacts of several scenarios for management and control of the residual radioactive wastes at the inactive Durango, Colorado, uranium processing site, including a no action alternative, an alternative to manage wastes on-site and three alternatives involving off-site management and decontamination of the Durango site.

479

2013 ANNUAL SITE ENVIRONMENTAL REPORT (ASER)  

Energy.gov (U.S. Department of Energy (DOE))

U.S. Department of Energy (DOE) Order 231.1B, Environment, Safety and Health Reporting, requires that each DOE site prepare an Annual Site Environmental Report (ASER) documenting the sites...

480

Independent Oversight Review, Savannah River Site - September 2012 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Independent Oversight Review, Savannah River Site - September 2012 September 2012 Review of the Savannah River Site, Salt Waste Processing Facility, Construction Quality of Piping & Pipe Supports The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security, conducted an independent review of construction quality at the U.S. Department of Energy (DOE) Savannah River Site (SRS) Salt Waste Processing Facility (SWPF). The focus of the review, performed on site between May 14 and 18, 2012, was piping and pipe supports. The review team also observed installation of two tanks in the dark cells (DCs). Subsequent to the onsite review, procurement records were reviewed for quality-related piping and piping system components.

Note: This page contains sample records for the topic "rifle processing site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

EERE: Weatherization and Intergovernmental Program - Site Map  

NLE Websites -- All DOE Office Websites (Extended Search)

Site Map Site Map Site Map Printable Version Share this resource Send a link to EERE: Weatherization and Intergovernmental Program - Site Map to someone by E-mail Share EERE: Weatherization and Intergovernmental Program - Site Map on Facebook Tweet about EERE: Weatherization and Intergovernmental Program - Site Map on Twitter Bookmark EERE: Weatherization and Intergovernmental Program - Site Map on Google Bookmark EERE: Weatherization and Intergovernmental Program - Site Map on Delicious Rank EERE: Weatherization and Intergovernmental Program - Site Map on Digg Find More places to share EERE: Weatherization and Intergovernmental Program - Site Map on AddThis.com... Site Map About Plans, Implementation, & Results Weatherization Assistance Program Weatherization Services

482

Site-Scale Saturated Zone Flow Model  

SciTech Connect

The purpose of this model report is to document the components of the site-scale saturated-zone flow model at Yucca Mountain, Nevada, in accordance with administrative procedure (AP)-SIII.lOQ, ''Models''. This report provides validation and confidence in the flow model that was developed for site recommendation (SR) and will be used to provide flow fields in support of the Total Systems Performance Assessment (TSPA) for the License Application. The output from this report provides the flow model used in the ''Site-Scale Saturated Zone Transport'', MDL-NBS-HS-000010 Rev 01 (BSC 2003 [162419]). The Site-Scale Saturated Zone Transport model then provides output to the SZ Transport Abstraction Model (BSC 2003 [164870]). In particular, the output from the SZ site-scale flow model is used to simulate the groundwater flow pathways and radionuclide transport to the accessible environment for use in the TSPA calculations. Since the development and calibration of the saturated-zone flow model, more data have been gathered for use in model validation and confidence building, including new water-level data from Nye County wells, single- and multiple-well hydraulic testing data, and new hydrochemistry data. In addition, a new hydrogeologic framework model (HFM), which incorporates Nye County wells lithology, also provides geologic data for corroboration and confidence in the flow model. The intended use of this work is to provide a flow model that generates flow fields to simulate radionuclide transport in saturated porous rock and alluvium under natural or forced gradient flow conditions. The flow model simulations are completed using the three-dimensional (3-D), finite-element, flow, heat, and transport computer code, FEHM Version (V) 2.20 (software tracking number (STN): 10086-2.20-00; LANL 2003 [161725]). Concurrently, process-level transport model and methodology for calculating radionuclide transport in the saturated zone at Yucca Mountain using FEHM V 2.20 are being carried out in the model report, ''Site-Scale Saturated Zone Transport'', MDL-NBS-HS-000010 Rev 01 (BSC 2003 [162419]). The velocity fields are calculated by the flow model, described herein, independent of the transport processes, and are then used as inputs to the transport model. Justification for this abstraction is presented in the model report, ''Saturated Zone Flow and Transport Model Abstraction'', MDL-NBS-HS-000021 (BSC 2003 [164870]).

G. Zyvoloski

2003-12-17T23:59:59.000Z

483

Hanford Site | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hanford Site Hanford Site Hanford Site Workers safely demolished a 175-foot-high exhaust stack at the Hanford Site in southeastern Washington state, a project supported by $420,000 in Recovery Act funds Workers safely demolished a 175-foot-high exhaust stack at the Hanford Site in southeastern Washington state, a project supported by $420,000 in Recovery Act funds Slurry pumps are used in the tank farms to pick up liquid and solid particle mixture, or slurry, and provide the force necessary to transport the waste from tank to tank during retrieval operations Slurry pumps are used in the tank farms to pick up liquid and solid particle mixture, or slurry, and provide the force necessary to transport the waste from tank to tank during retrieval operations The Pretreatment Facility control room building pad (foreground) and the Low-Activity Waste Facility (background)

484

Piketon Site Partnering Agreement 2011  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fluor-B&W I Fluor-B&W I Portsmouth" Restoration Services. Inc. B:W conversion serVices, Ie ~~WEMS Wastren-EnergX Mission Support, LLC Piketon Site Partnering Agreement 2011 O n behalf of the taxpayers of this nation and the communities of the four counties surrounding the former Gaseous Diffusion Plant Site in Piketon, Ohio, we, the U.S. Department of Energy and its Prime Contractors, stand together as One Site Team. We enter into this Partnering Agreement with the conviction and shared responsibility to operate and clean up the Piketon Site safely and efficiently -- while protecting the public health and the environment. We believe that - only together - can we return the Site to the community as a platform for sustainable regional growth and new jobs.

485

NSA-Beaver Pond Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Beaver Pond Site (NSA-BP) Beaver Pond Site (NSA-BP) The storage tent and gas collectors NSA-BP site looking to the east. Visible is the investigator hut on drier land to the west and the boardwalk leading out to the tower site in the right portion of the image with the mounded beaver lodge visible in the middle of the image. The bridge and the 3 meter flux tower The beaver lodge The bridge from the flux tower This is the floating bridge leading from the flux tower back to the shore. The large tent for holding equipment is clearly visible on the shore. The TGB gas collectors on the beaver pond Back to the BOREAS Photo Page Index Other Sites: NSA Photos ||NSA-BP Photos | NSA-Fen Photos | NSA-OA Photos | NSA-OBS Photos | NSA-OJP Photos | NSA-UBS Photos | NSA-YJP Photos | NSA-Ops Photos

486

Closure Plan for the Area 5 Radioactive Waste Management Site at the Nevada Test Site  

SciTech Connect

The Area 5 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the preliminary closure plan for the Area 5 RWMS at the NTS that was presented in the Integrated Closure and Monitoring Plan (DOE, 2005a). The major updates to the plan include a new closure schedule, updated closure inventory, updated site and facility characterization data, the Title II engineering cover design, and the closure process for the 92-Acre Area of the RWMS. The format and content of this site-specific plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). This interim closure plan meets closure and post-closure monitoring requirements of the order DOE O 435.1, manual DOE M 435.1-1, Title 40 Code of Federal Regulations (CFR) Part 191, 40 CFR 265, Nevada Administrative Code (NAC) 444.743, and Resource Conservation and Recovery Act (RCRA) requirements as incorporated into NAC 444.8632. The Area 5 RWMS accepts primarily packaged low-level waste (LLW), low-level mixed waste (LLMW), and asbestiform low-level waste (ALLW) for disposal in excavated disposal cells.

NSTec Environmental Management

2008-09-01T23:59:59.000Z

487

Environmental factors for site?to?site differences in low?frequency surface scatter  

Science Journals Connector (OSTI)

Acoustic reverberation experiments conducted during the extensive Critical Sea Test (CST) Program have indicated that near?surface microbubble clouds are the primary source of low?frequency (01000 Hz) acoustic surface scatter during elevated winds. A crucial issue remaining from CST however is the explanation of large (greater than 15 dB) site?to?site differences in surface scattering strength. Using the extensive CST environmental observation set as well as satellite remote sensing products available over the World Wide Web we have investigated the hypothesis that site?to?site differences are controlled by processes related to the supply mixing and removal of near?surface bubbles in the ocean. It is found that much of the variability can be empirically explained by considering the mean ocean temperature biological productivity and wave conditions at each site. These results provide important clues as to the controlling factors for surface scatter in shallow water areas where biological productivity is highest. The implications for improving an operational surface scattering prediction capability using readily available (e.g. satellite observations) environmental inputs will be discussed. [Work supported by the Office of Naval Research/Ocean Acoustics.

Jeffrey L. Hanson

1998-01-01T23:59:59.000Z

488

Independent Oversight Inspection, Hanford Site - February 2009 | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Oversight Inspection, Hanford Site - February 2009 Independent Oversight Inspection, Hanford Site - February 2009 Independent Oversight Inspection, Hanford Site - February 2009 February 2009 Inspection of Environment, Safety and Health Programs at the Hanford Site Waste Treatment and Immobilization Plant The U.S. Department of Energy (DOE) Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), inspected environment, safety, and health (ES&H) programs at the DOE Hanford Site Waste Treatment and Immobilization Plant (WTP) during October through November 2008. HSS reports directly to the Office of the Secretary of Energy, and the ES&H inspection was performed by Independent Oversight's Office of Environment, Safety and Health Evaluations. BNI has made significant improvements in nuclear safety processes, in part,

489

Site Visit Report, Lawrence Livermore National Laboratory - February 2011 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site Visit Report, Lawrence Livermore National Laboratory - Site Visit Report, Lawrence Livermore National Laboratory - February 2011 Site Visit Report, Lawrence Livermore National Laboratory - February 2011 February 2011 Lawrence Livermore National Laboratory Safety Basis Assessment This site visit report documents the collective results of the review of Lawrence Livermore National Laboratory (LLNL) safety basis processes and discusses its scope, objective, results and conclusions. Appendix A provides lists of the documents, interviews, and observations and Appendix B includes the plan for the review. This combined assessment was sponsored by the National Nuclear Safety Administration (NNSA) Livermore Site Office (LSO) and conducted jointly by staff from the Office of Health, Safety and Security (HSS) and LSO. The review was conducted in late 2010 and included

490

Site Visit Report, Los Alamos National Laboratory - June 2010 | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site Visit Report, Los Alamos National Laboratory - June 2010 Site Visit Report, Los Alamos National Laboratory - June 2010 Site Visit Report, Los Alamos National Laboratory - June 2010 June 2010 Facility Centered Assessment of the Los Alamos National Laboratory Radioactive Liquid Waste Treatment Facility This site visit report documents the results of the Office of Health, Safety and Security's (HSS) review of the Facility Centered Assessment (FCA) of the Los Alamos National Laboratory (LANL) Radioactive Liquid Waste Treatment Facility (RLW). This review, conducted June 9-25, 2010, was sponsored by the U.S. Department of Energy (DOE) Los Alamos Site Office (LASO) and LANL, and conducted jointly by HSS, LASO, and LANL staff. The Office of Environment, Safety and Health Evaluations was the overall lead organization for evaluation of the FCA process with the participation of

491

Independent Oversight Inspection, Savannah River Site Office - December  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Office - Savannah River Site Office - December 2009 Independent Oversight Inspection, Savannah River Site Office - December 2009 December 2009 Inspection of Nuclear Safety at the Savannah River Site Office and the Tritium Program Facilities The U.S. Department of Energy (DOE) Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), conducted an inspection of nuclear safety at several National Nuclear Security Administration (NNSA) facilities located at DOE's Savannah River Site (SRS) during August and September 2009. The inspection was performed by the Office of Independent Oversight's Office of Environment, Safety and Health Evaluations. With some isolated exceptions, the current SRNS nuclear safety programs and processes at the Tritium Program facilities are effective. Facility and