National Library of Energy BETA

Sample records for richland wa pacific

  1. ERSUG Meeting: January 12 - 13, 1995 (Richland, WA)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ERSUG Meeting: January 12 - 13, 1995 (Richland, WA) Dates January 12th & 13th, 1995 Location Pacific Northwest Laboratory Richland, Washington Presentations Summary of ERSUG Meeting January 12 - 13, 1995, Richland, Washington The latest Energy Research Supercomputer Users Group (ERSUG) meeting was held at Pacific Northwest Laboratory in Richland, Washington, on January 12 - 13, 1995. Some of the talks are summarized below. The View from Washington (Tom Kitchens) Tom Kitchens presented the

  2. EIS-0189: Tank Waste Remediation System (TWRS), Richland, WA (Programmatic)

    Broader source: Energy.gov [DOE]

    This environmental impact statement evaluates the Department of Energy (DOE)'s, in cooperation with the Washington State Department of Ecology (Ecology), decisions on how to properly manage and dispose of Hanford Site tank waste and encapsulated cesium and strontium to reduce existing and potential future risk to the public, Site workers, and the environment. The waste includes radioactive, hazardous, and mixed waste currently stored in 177 underground storage tanks, approximately 60 other smaller active and inactive miscellaneous underground storage tanks (MUSTs), and additional Site waste likely to be added to the tank waste, which is part of the tank farm system. In addition, DOE proposes to manage and dispose of approximately 1,930 cesium and strontium capsules that are by-products of tank waste. The tank waste and capsules are located in the 200 Areas of the Hanford Site near Richland, Washington.

  3. EIS-0119: Decommissioning of Eight Surplus Production Reactors at the Harford Site, Richland, WA

    Broader source: Energy.gov [DOE]

    This EIS presents analyses of potential environmental impacts of decommissioning the eight surplus production reactors at the Hanford Site near Richland, Washington.

  4. Analyses of soils at commercial radioactive-waste-disposal sites. [Barnwell, SC; Richland, WA

    SciTech Connect (OSTI)

    Piciulo, P.L.; Shea, C.E.; Barletta, R.E.

    1982-01-01

    Brookhaven National Laboratory, in order to provide technical assistance to the NRC, has measured a number of physical and chemical characteristics of soils from two currently operating commercial radioactive waste disposal sites; one at Barnwell, SC, and the other near Richland, WA. Soil samples believed to be representative of the soil that will contact the buried waste were collected and analyzed. Earth resistivities (field measurements), from both sites, supply information to identify variations in subsurface material. Barnwell soil resistivities (laboratory measurements) range from 3.6 x 10/sup 5/ ohm-cm to 8.9 x 10/sup 4/ ohm-cm. Soil resistivities of the Hanford sample vary from 3.0 x 10/sup 5/ ohm-cm to 6.6 x 10/sup 3/ ohm-cm. The Barnwell and Hanford soil pH ranges from 4.8 to 5.4 and from 4.0 to 7.2 respectively. The pH of a 1:2 mixture of soil to 0.01 M CaCl/sub 2/ resulted in a pH for the Barnwell samples of 3.9 +- 0.1 and for the Hanford samples of 7.4 +- 0.2. These values are comparable to the pH measurements of the water extract of the soils used for the analyses of soluble ion content of the soils. The exchange acidity of the soils was found to be approximately 7 mg-eq per 100 g of dry soil for clay material from Barnwell, whereas the Hanford soils showed an alkaline reaction. Aqueous extracts of saturated pastes were used to determine the concentrations of the following ions: Ca/sup 2 +/, Mg/sup 2 +/, K/sup +/, Na/sup +/, HCO/sub 3//sup -/, SO/sub 4//sup =/, and Cl/sup -/. The sulfide content of each of the soils was measured in a 1:2.5 mixture of soil to an antioxidant buffer solution. The concentrations of soluble ions found in the soils from both sites are consistent with the high resistivities.

  5. EIS-0364: Decommissioning of the Fast Flux Test Facility, Hanford Site, Richland, WA

    Office of Energy Efficiency and Renewable Energy (EERE)

    The U.S. Department of Energy (DOE) announces its intent to prepare an Environmental Impact Statement (EIS), pursuant to the National Environmental Policy Act of 1969 (NEPA), on proposed decommissioning of the Fast Flux Test Facility (FFTF) at the Hanford Site, Richland, Washington.

  6. Richland Energy Services - Residential Energy Efficiency Rebate...

    Broader source: Energy.gov (indexed) [DOE]

    Program Info Sector Name Utility Administrator City of Richland Website http:www.ci.richland.wa.usindex.aspx?nid174 State Washington Program Type Rebate Program Rebate...

  7. City of Richland, Washington (Utility Company) | Open Energy...

    Open Energy Info (EERE)

    Name: City of Richland Place: Washington Phone Number: (509) 942-7421 Website: www.ci.richland.wa.usindex.as Outage Hotline: After Hours and Weekends: (509) 943-4428...

  8. December 15-16, 2015 - Technical Exchange Meeting - Richland...

    Broader source: Energy.gov (indexed) [DOE]

    Technical Exchange Meeting, December 15 and 16, 2015, Washington State Department of Ecology Offices, Richland, WA. Theme: Interpretation of Performance and Risk Assessment...

  9. EIS-0356: Retrieval, Treatment and Disposal of Tank Wastes and Closure of Single-Shell Tanks at the Hanford Site, Richland, WA

    Broader source: Energy.gov [DOE]

    This EIS analyzes DOE's proposed retrieval, treatment, and disposal of the waste being managed in the high-level waste (HLW) tank farms at the Hanford Site near Richland, Washington, and closure of the 149 single-shell tanks (SSTs) and associated facilities in the HLW tank farms.

  10. DOE Climate Change Adaptation Training (Richland, WA)

    Broader source: Energy.gov [DOE]

    This free training is a primer on climate science, identifying climate hazards, conducting vulnerability assessments, leveraging climate change data and tools and understanding the energy-water-food nexus.

  11. PIA - Richland Occupational Medicine Contract | Department of...

    Energy Savers [EERE]

    PIA - Richland Occupational Medicine Contract PIA - Richland Occupational Medicine Contract PIA - Richland Occupational Medicine Contract PDF icon PIA - Richland Occupational...

  12. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    /: -. !~t. Department of Energy Richland Operations Office P.O. Box 550 Richland, Washington 99352 Nav 0 4 ?nn~ 05-AMCP-OO46 Mr. Todd Martin, Chair Hanford Advisory Board 1933 Jadwin, Suite 135 Richland, Washington 99352 Dear Mr. Martin: HANFORD ADVISORY BOARD (HAB) ADVICE #166 -FUND U PLANT AREA REMEDIATION ACTIVITIES In response to your letter dated September 10, 2004, the U.S. Department of Energy, Richland Operations Office (RL), appreciates your recommendations contained in HAB Consensus

  13. Richland Operations Office - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Richland Operations Office Richland Operations Office Richland Operations Office River Corridor Central Plateau Groundwater Mission Support Newsroom Richland Operations Office Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size Registration for 2016 Hanford Cleanup Tours Hanford Public Comment Period Hanford Public Comment Period UNITED STATES DEPARTMENT OF ENERGY Richland Operations Office RL2016LogoVert StacyCharboneau Welcome to the Richland Operations Office (RL),

  14. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ITEM 1 Department of Energy Richland Operations Office P.O. Box 550 Richland, Washington 99352 15-PRO-0175 APR 3 0 205 Mr. J. A. Ciucci, President and Chief Executive Officer CH2M HILL Plateau Remediation Company Richland, Washington 99352 Dear Mr. Ciucci: CONTRACT NO. DE-ACO6-08RL 14788 - FISCAL YEAR (FY) 2014 FINAL FEE DETERMINATION FOR PLATEAU REMEDIATION CONTRACT The purpose of this letter is to provide the final fee determination for the FY 2014 evaluation period. Pursuant to the

  15. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Department of Energy Richland Operations Office P.O. Box 550 &?ATES0~Richland, Washington 99352 10O-AMSE-0054 A PR I~ ~~ Mr. J. G. Lehew III, President and Chief Executive Officer CH2M HILL Plateau Remediation Company Richland, Washington 99352 Dear Mr. Lehew: CONTRACT NO. DE-AC06-08RL14788 - DE MINIMIS CHANGES TO THE HANFORD ANALYTICAL SERVICES QUALITY ASSURANCE REQUIREMENTS DOCUMENT (HASQARD) Compliance with the HASQARD, DOE/RL-96-68, is required by your Contract (Attachment J.2, List B:

  16. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    t P.O. Box 550 4TESRichland, Washington 99352 1 0-AMSE-0056 Anp 01 2019t Mr. F. A. Figueroa, President and General Manager Mission Support Alliance, LLC Richland, Washington...

  17. EA-1958: Future Development in proximity to the William R. Wiley Environmental Molecular Sciences Laboratory, Pacific Northwest National Laboratory, Richland, Washington

    Broader source: Energy.gov [DOE]

    This Environmental Assessment (EA) evaluates U.S. Department of Energy (DOE) activities associated with proposed future development on the South Federal Campus of the DOE Pacific Northwest National Laboratory (PNNL) Site, in Benton County, Washington.

  18. Independent Oversight Review, Richland Operations Office - November...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Richland Operations Office - November 2012 Independent Oversight Review, Richland Operations Office - November 2012 November 2012 Review of the Richland Operations Office Oversight...

  19. PIA - Richland Occupational Medicine Contract | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Medicine Contract PIA - Richland Occupational Medicine Contract PIA - Richland Occupational Medicine Contract PDF icon PIA - Richland Occupational Medicine Contract More Documents ...

  20. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ZATESO~'P.O. Box 550 E Richland, Washington 99352 11 -SED-0 124 JUL 0 7 2Mt Mr. J. G. Lehew 111, President and Chief Executive Officer CH2M HILL Plateau Remnediation Company Richland, Washington 99352 Dear Mr. Lehew: CONTRACT NO. DE-ACO6-08RL 14788 - TRANSN4ITTAL OF SURVEILLANCE REPORT PLANNING AND EXECUTION OF RADIOLOGICAL WORK (S-1I l-SFD-CHPRC-PFP-002) Pursuant to Clause E. 1, "DOE Inspection and Acceptance," this letter transmits Surveillance Report S-1 I -SED-CHPRC-PFP-002. The

  1. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    t P.O. Box 550 ~4TES~Richland, Washington 99352 1 0-AMSE-0056 Anp 01 2019t Mr. F. A. Figueroa, President and General Manager Mission Support Alliance, LLC Richland, Washington 99352 Dear Mr. Figueroa: CONTRACT NO. DE-AC06-09RL 14728 - DE MINIMIS CHANGES TO THE HANFORD ANALYTICAL SERVICES QUALITY ASSURANCE REQUIREMENTS DOCUMENT (HASQARD) Compliance with the HASQARD, DOE/RL-96-68, is required by your Contract (Section J, Table J-2.9). The HASQARD contains the standards for site sampling and

  2. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ' 5 ~7AE d~Richland, Washington 99352 10-AMSE-0055 APR 0 9 2010 Mr. M. N. Brosee, President Washington Closure Hanford LLC Richland, Washington 99354 Dear Mr. Brosee: CONTRACT NO. DE-AC06-05RL14655 - DE MINIMIS CHANGES TO THE HANFORD ANALYTICAL SERVICES QUALITY ASSURANCE REQUIREMENTS DOCUMENT (HAS QARD) Compliance with the HASQARD, DOE/RL-96-68, is required by your Contract (Attachment J-2, List B: Applicable DOE Directives). The HASQARD contains the standards for site sampling and analytical

  3. Dynamically Responsive Infrared Window Coatings

    Broader source: Energy.gov [DOE]

    Lead Performer: Pacific Northwest National Laboratory - Richland, WA Partners: PPG Industries - Pittsburgh, PA

  4. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4TES~Richland, Washington 99352 August 5, 2010 Certified Mail Mr. Alec Osenbach Heart of America Northwest 1314 NE 56 th Street Suite 100 Seattle, Washington 98105 Dear Mr. Osenbach: FREEDOM OF INFORMATION ACT REQUEST (FOI 2010-01599) You requested, pursuant to the Freedom of Information Act (FOIA), the following informnation: 1 . Documents and records relating to the potential duration of storage for soil excavated since 2009 from the Environmental Restoration Disposal Facility (ERDF) at the

  5. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Richland, Washington 99352 May 3, 2012 CERTIFIED MAIL Mr. Thomas Carpenter Hanford Challenge 219 1 St Avenue South, Suite 120 Seattle, Washington 98104 Dear Mr. Carpenter: FREEDOM OF INFORMATION ACT REQUEST (FOI 20 12-00870) You requested, pursuant to the Freedom of Information Act (FOLA), the following records generated in connection with a surveillance report entitled, "Review of the 100 K Infrastructure Utilities Upgrade Project:" 1. "A copy of the Surveillance report." 2.

  6. EIS-0244: Plutonium Finishing Plant Stabilization, Hanford Site, Richland, WA

    Broader source: Energy.gov [DOE]

    This EIS evaluates the impacts on the human environment of: Stabilization of residual, plutonium-bearing materials at the PFP Facility to a form suitable for interim storage at the PFP Facility. Immobilization of residual plutonium-bearing materials at the PFP Facility. Removal of readily retrievable, plutonium-bearing materials left behind in process equipment, process areas, and air and liquid waste management systems as a result of historic uses.

  7. EIS-0467: Hanford Site Natural Gas Pipeline, Richland, WA

    Broader source: Energy.gov [DOE]

    DOE has postponed preparation of this EIS to better align the completion of the EIS with planned future operations of facilities on Hanford’s Central Plateau (such as Hanford’s Waste Treatment and Immobilization Plant).

  8. Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    144 December 2014 Page 1 Activity Specific Categorical Exclusion for U.S. Army Training Exercises and Simulations at the Hanford Site, Richland, Washington 1.0 BACKGROUND Title 10, Part 1021 of the Code of Federal Regulations (10 CFR 1021), "National Environmental Policy Act Implementing Procedures," establishes procedures that the U.S. Department of Energy (DOE) uses to comply with section 102(2) of the National Environmental Policy Act (NEPA) of 1969 [42 U.S.C. 4332(2)] and the

  9. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ESO~Richland, Washington 99352 August 4, 2009 Certified Mail Mr. Thomas Zeilman Law Office of Thomas Zeilamn P.O. Box 34 Yakima, Washington 98907 Dear Mr. Zeilman: FREEDOM OF INFORMATION ACT REQUEST (FOI 2009-0041) You requested, pursuant to the Freedom of Information Act (FOJA), documents regarding any decisions made by the U.S. Department of Energy (DOE) to prohibit hunting or trapping of the Rattlesnake Hills Elk Herd within the Fitzner-Eberhart Arid Lands Ecology Reserve at the Hanford

  10. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    E Richland, Washington 99352 Certified Mail Mr. Thomas Zeilman Law Office of Thomas Zeilamn JUN 1 5 2009 P.O. Box 34 Yakima, Washington 98907 Dear Mr. Zeilman: FREEDOM OF INFORMATION ACT REQUEST (FOI 2009-0041) You requested, pursuant to the Freedom of Information Act (FOJA), documents regarding any decisions made by the U.S. Department of Energy (DOE) to prohibit hunting or trapping of the Rattlesnake Hills Elk Herd within the Fitzner-Eberhart Arid Lands Ecology Reserve at the Hanford Reach

  11. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ATES Richland, Washington 99352 CERTIFIED MAIL SEP 1 4 2009 Mr. Ryan Jarvis Heart of America Northwest 1314 N.E. 5 6 th Street Suite 100 Seattle, Washington 98105 Dear Mr. Jarvis: FREEDOM OF INFORMATION ACT REQUEST (FOI 2009-0054) This letter is a partial response to your letters dated June 22, 2009, and July 15, 2009. In response to item 8, you requested "any records and documents relating to the contingency plan required pursuant to Washington Administrative Code Sections 173-303-806,

  12. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    :4Tsc1 ~Richland, Washington 99352 December 18, 2009 CERTIFIED MAIL Ms. Shannon Dininny The Associated Press P.O. Box 1349 Yakima, Washington 98901 Dear Ms. Dininny: FREEDOM OF INFORMATION ACT REQUEST (FOI 20 10-00644) Your Freedom of Information Act (FOIA) request dated December 2, 2009, addressed to the U.S. Department of Energy, Headquarters FOJA Office has been forwarded to this office for response as well as to the DOE Office of Environmental Management (EM), the Oak Ridge Operations Office

  13. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ATESORichland, Washington 99352 16-PRO-0061 DEC 17 2015 Ms. H. P. Mooers, President HPM Corporation 4304 West 2 4 th Aye, Suite 100 Kennewick, Washington 99338 Dear Ms. Mooers: CONTRACT NO. DE-EM0002043 - HPM CORPORATION (HPMC) FISCAL YEAR 2015 PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) FEE DETERMINATION The U.S. Department of Energy Richland Operation Office (RL) has completed its evaluation of I-PMC's performance for the period of October 1, 2014, through September 30, 2015. As the Fee

  14. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Pursuant to the Freedom of Information Act, you requested Contract AT-45-1I-GEN 21 between the Atomic Energy Commission and the Northern Pacific Railway Company dated December 7, ...

  15. Raciometry W. J:. Shaw and C. D. Whiteman Pacific Northwest Laboratory(a)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    W. J:. Shaw and C. D. Whiteman Pacific Northwest Laboratory(a) Richland, WA 99352 Field measurements to evaluate the parameterizations used in this model were carried out in May 1992 under clear skies using short- and long-wave radiometers mounted on a computer-driven platform. The platform repeatedly stepped through 360 degrees of azimuth and 20 degrees of elevation about the horizontal over a 24-h period. Radiosondes were released to account for the dependence of downwelling long-wave radiance

  16. Town of Richland | Open Energy Information

    Open Energy Info (EERE)

    Town of Richland Sector Wind energy Facility Type Small Scale Wind Facility Status In Service Owner Sustainable Energy Development Energy Purchaser Town of Richland Location...

  17. Annual Energy Consumption Analysis Report for Richland Middle School

    SciTech Connect (OSTI)

    Liu, Bing

    2003-12-18

    Richland Middle School is a single story, 90,000 square feet new school located in Richland, WA. The design team proposed four HVAC system options to serve the building. The proposed HVAC systems are listed as following: (1) 4-pipe fan coil units served by electrical chiller and gas-fired boilers, (2) Ground-source closed water loop heat pumps with water loop heat pumps with boiler and cooling tower, and (3) VAV system served by electrical chiller and gas-fired boiler. This analysis estimates the annual energy consumptions and costs of each system option, in order to provide the design team with a reasonable basis for determining which system is most life-cycle cost effective. eQuest (version 3.37), a computer-based energy simulation program that uses the DOE-2 simulation engine, was used to estimate the annual energy costs.

  18. Columbia River monitoring: Distribution of tritium in Columbia River water at the Richland Pumphouse

    SciTech Connect (OSTI)

    Dirkes, R.L.

    1993-02-01

    The Surface Environmental Surveillance Project (SESP) is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This report presents the results of a special study conducted as part of the SESP to supplement the routine Columbia River monitoring program and provide information relative to the dispersion and distribution of Hanford origin contaminants entering the river through the seepage of ground water along the Hanford Site. Sampling was conducted along cross sections to determine the distribution of tritium within the Columbia River at Richland, Washington. The investigation was also designed to evaluate the relationship between the average tritium concentrations in the river water at this location and in water collected from the routine SESP river monitoring system located at the city of Richland drinking water intake (Richland Pumphouse). This study was conducted during the summers of 1987 and 1988. Water samples were collected along cross sections located at or near the Richland Pumphouse monitoring station.

  19. Richland Operations Office Cleanup Strategy, Scope

    Energy Savers [EERE]

    Richland Operations Office Cleanup Strategy, Scope Matt McCormick Manager Richland Operations Office May 1, 2014 John Ciucci Chief Operating Officer CH2M HILL Plateau Remediation Company Scott Sax President and Project Manager Washington Closure Hanford Frank Armijo President and General Manager Mission Support Alliance www.energy.gov/EM 2 Richland Operations Office Hanford Site History Hanford * Hanford began in 1943 as part of the Manhattan Project * Production of plutonium increased during

  20. Richland Electric Coop | Open Energy Information

    Open Energy Info (EERE)

    Coop Place: Wisconsin Phone Number: (608) 647-3173 Website: www.richec.comindex.html Facebook: https:www.facebook.compagesRichland-Electric-Cooperative156038837800606...

  1. Independent Oversight Review, Richland Operations Office and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and work management and control processes in the areas of conduct of operations, quality assurance, and integrated safety management. Independent Oversight Review, Richland...

  2. Mark R. Hahn of the Richland Operations Office presented 2014...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mark R. Hahn of the Richland Operations Office presented 2014 Safety System Oversight Annual Award Mark R. Hahn of the Richland Operations Office presented 2014 Safety System ...

  3. Badge Request System PIA, Richland Operations Office | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Badge Request System PIA, Richland Operations Office PDF icon Badge Request System PIA, Richland Operations Office More Documents & Publications Integrated Safety Management ...

  4. Pacific Northwest Site Office Jobs

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Administration Pacific Northwest National Laboratory WSU Mechanical Engineering students unveil their solutions to help PNNL researchers with nonproliferation and international safeguards work Pacific Northwest National Laboratory (PNNL) has partnered with Washington State University students for the past seven years to develop new instruments, tools, and methods to support nonproliferation and international safeguards. The students unveiled their latest designs last month in Richland,...

  5. Contractor Fee Payments- Richland Operations Office

    Office of Energy Efficiency and Renewable Energy (EERE)

    See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Richland Operations Office on these charts. 

  6. Richland, Washington: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Hide Map This article is a stub. You can help OpenEI by expanding it. Richland is a city in Benton County, Washington. It falls under Washington's 4th congressional...

  7. Independent Specific Administrative Controls Review, Richland Operations Office- December 2010

    Broader source: Energy.gov [DOE]

    Specific Administrative Controls Review with the Office of Environmental Management at DOE-Richland Operations Office

  8. Hanford Identification (HID) PIA, Richland Operations Office | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Identification (HID) PIA, Richland Operations Office Hanford Identification (HID) PIA, Richland Operations Office Hanford Identification (HID) PIA, Richland Operations Office PDF icon Hanford Identification (HID) PIA, Richland Operations Office More Documents & Publications Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory Manchester Software 1099 Reporting PIA, Idaho National

  9. U Department of Energy Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    T01 U Department of Energy Richland Operations Office P.O. Box 550 STESo Richland, Washington 99352 April 29, 2010 Certified Mail Mr. Dvija Bertish Director of Environmnental & Conservation Rosemere Neighborhood Association P.O. Box 61471 Vancouver, Washington 98666 Dear Mr. Bertish: FREEDOM OF INFORMATION ACT REQUEST (FOI 2010-013 19) You requested, pursuant to the Freedom of Information Act (FOIA), a copy of the Court Reporter's transcript of the public hearing held in Portland Oregon on

  10. DOE, City of Richland and Benton PUD Increase Fiber Optic Telecommunic...

    Office of Environmental Management (EM)

    DOE and contractor Mission Support Alliance (MSA) collaborated with Benton PUD and the city of Richland to deploy 360 strands of fiber from downtown Richland to north Richland....

  11. Employee Job Task Analysis (EJTA) PIA, Richland Operations Office |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Job Task Analysis (EJTA) PIA, Richland Operations Office Employee Job Task Analysis (EJTA) PIA, Richland Operations Office Employee Job Task Analysis (EJTA) PIA, Richland Operations Office PDF icon Employee Job Task Analysis (EJTA) PIA, Richland Operations Office More Documents & Publications Occupational Medicine - Assistant PIA, Idaho National Laboratory Occupational Injury & Illness System (01&15) PIA, Idaho National Laboratory PIA - GovTrip (DOE data

  12. Hanford People Core (HCP) PIA, Richland Operations Office | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy People Core (HCP) PIA, Richland Operations Office Hanford People Core (HCP) PIA, Richland Operations Office Hanford People Core (HCP) PIA, Richland Operations Office PDF icon Hanford People Core (HCP) PIA, Richland Operations Office More Documents & Publications E-IDR (Inventory Disclosure Record) PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory

  13. Richland County, Wisconsin: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Cazenovia, Wisconsin Henrietta, Wisconsin Ithaca, Wisconsin Lone Rock, Wisconsin Orion, Wisconsin Richland Center, Wisconsin Richwood, Wisconsin Rockbridge, Wisconsin...

  14. Categorical Exclusion Determinations: Office of River Protection-Richland

    Energy Savers [EERE]

    Opperations Office | Department of Energy River Protection-Richland Opperations Office Categorical Exclusion Determinations: Office of River Protection-Richland Opperations Office Categorical Exclusion Determinations issued by Office of River Protection-Richland Office. DOCUMENTS AVAILABLE FOR DOWNLOAD July 29, 2014 CX-012727: Categorical Exclusion Determination CHPRC Cleanup Actions CX(s) Applied: B6.1 Date: 41849 Location(s): Washington Offices(s): River Protection-Richland Operations

  15. Employee Job Task Analysis (EJTA) PIA, Richland Operations Office...

    Energy Savers [EERE]

    (EJTA) PIA, Richland Operations Office More Documents & Publications Occupational Medicine - Assistant PIA, Idaho National Laboratory Occupational Injury & Illness System...

  16. EIS-0212: Safe Interim Storage of Hanford Tank Wastes, Hanford Site, Richland, WA

    Broader source: Energy.gov [DOE]

    This environmental impact statement asseses Department of Energy and Washington State Department of Ecology maintanence of safe storage of high-level radioactive wastes currently stored in the older single-shell tanks, the Watchlist Tank 101-SY, and future waste volumes associated with tank farm and other Hanford facility operations, including a need to provide a modern safe, reliable, and regulatory-compliant replacement cross-site transfer capability. The purpose of this action is to prevent uncontrolled releases to the environment by maintaining safe storage of high-level tank wastes.

  17. Measurement of Fukushima Aerosol Debris in Sequim and Richland, WA and Ketchikan, AK

    SciTech Connect (OSTI)

    Miley, Harry S.; Bowyer, Ted W.; Engelmann, Mark D.; Eslinger, Paul W.; Friese, Judah I.; Greenwood, Lawrence R.; Haas, Derek A.; Hayes, James C.; Keillor, Martin E.; Kiddy, Robert A.; Kirkham, Randy R.; Landen, Jonathan W.; Lepel, Elwood A.; Lidey, Lance S.; Litke, Kevin E.; Morris, Scott J.; Olsen, Khris B.; Thompson, Robert C.; Valenzuela, Blandina R.; Woods, Vincent T.; Biegalski, Steven R.

    2013-05-01

    Aerosol collections were initiated at several locations by PNNL shortly after the Great East Japan Earthquake of May 2011. Aerosol samples were transferred to laboratory high-resolution gamma spectrometers for analysis. Similar to treaty monitoring stations operating across the Northern hemisphere, iodine and other isotopes which could be volatilized at high temperature were detected. Though these locations are not far apart, they have significant variations with respect to water, mountain-range placement, and local topography. Variation in computed source terms will be shown to bound the variability of this approach to source estimation.

  18. 2012 Annual Planning Summary for Richland Office | Department of Energy

    Energy Savers [EERE]

    Richland Office 2012 Annual Planning Summary for Richland Office The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within Richland Office. PDF icon APS-2012-RL.pdf More Documents & Publications 2012 Annual Planning Summary for Fossil Energy, National Energy Technology Laboratory, RMOTC, and Strategic Petroleum Reserve Field Office 2012 Annual Planning Summary for Portsmouth Paducah Project

  19. Technical Qualification Program Self-Assessment Report - Richland

    Energy Savers [EERE]

    Operations Office - 2014 | Department of Energy Richland Operations Office - 2014 Technical Qualification Program Self-Assessment Report - Richland Operations Office - 2014 The Richland Operations Office (RL) Technical Qualification Program Plan establishes a process to objectively determine that individuals performing activities related to the technical support, management, oversight, or operation possess the necessary knowledge, skills, and abilities to perform their assigned duties and

  20. Josh Allen of Richland Operations Office Named 2014 Facility Representative

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of the Year | Department of Energy Josh Allen of Richland Operations Office Named 2014 Facility Representative of the Year Josh Allen of Richland Operations Office Named 2014 Facility Representative of the Year May 21, 2015 - 1:22pm Addthis Josh Allen of Richland Operations Office Named 2014 Facility Representative of the Year About 200 Department of Energy (DOE) federal employees are Facility Representatives (FR) who provide day-to-day oversight of contractor operations at DOE facilities.

  1. 2011 Annual Planning Summary for Richland Operations Office ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessments and Environmental Impact Statements for 2011 and 2012 within the Richland Operations Office (RL) (see also Office of River Protection and Environmental Management). ...

  2. 2014 Annual Planning Summary for the Richland Operations Office...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications 2011 Annual Planning Summary for Richland Operations Office (RL) 2011 Annual Planning Summary for Office of River Protection (ORP) EIS-0222-SA-01: ...

  3. MEMORANDUM FORMA TTHEW S. MCCORMICK MANAGER RICHLAND OPERATIONS...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    , SUBJECT: ENVIRONMENTAL MANAGEMENT Delegation of Acquisition Executive AuthorJty for Capital Asset Projects at. Richland Operations Office In accordance with the guidelines of...

  4. Richland County, South Carolina: Energy Resources | Open Energy...

    Open Energy Info (EERE)

    LLC PFCT South Carolina Hydrogen and Fuel Cell Alliance US National Institute of Hydrogen Fuel Cell Commercialization Places in Richland County, South Carolina Arcadia...

  5. Richland County, Ohio: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Braintree Business Development Center Places in Richland County, Ohio Bellville, Ohio Butler, Ohio Crestline, Ohio Galion, Ohio Lexington, Ohio Lucas, Ohio Mansfield, Ohio...

  6. City of Richland Center, Wisconsin (Utility Company) | Open Energy...

    Open Energy Info (EERE)

    Website: cityutilitiesofrc.com Facebook: https:www.facebook.compagesCity-of-Richland-Center120964331250544 Outage Hotline: (608) 647-3844 References: EIA Form EIA-861 Final...

  7. "Title","Creator/Author","Publication Date","OSTI Identifier...

    Office of Scientific and Technical Information (OSTI)

    Report",,,,"Pacific Northwest National Laboratory (PNNL), Richland, WA (US)","USDOE","32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION; ENVIRONMENTAL IMPACTS; LIFE CYCLE;...

  8. Retro-Commissioning Sensor Suitcase Commercialization Pilot Project

    Broader source: Energy.gov [DOE]

    Lead Performers: -- Pacific Northwest National Laboratory – Richland, WA -- Lawrence Berkeley National Laboratory – Berkeley, CA -- Oak Ridge National Laboratory – Oak Ridge, TN

  9. Dynamic simulation of kinematic Stirling engines: Coupled and...

    Office of Scientific and Technical Information (OSTI)

    Volume 3; Goswami, D.Y. ed. Univ. of Florida, Gainesville, FL (United States); Kannberg, L.D.; Somasundaram, S. eds. Pacific Northwest Lab., Richland, WA (United States); ...

  10. Special Section Guest Editorial. Advances in Remote Sensing for...

    Office of Scientific and Technical Information (OSTI)

    Authors: Zhou, Yuyu 1 ; Weng, Qihao 2 ; Chang, Ni-Bin 3 + Show Author Affiliations Pacific Northwest National Lab. (PNNL), Richland, WA (United States) Indiana State Univ., ...

  11. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    (AB) (United States) Ohio Field Office, Miamisburg, OH (United States) PNNL Microscopy Data Portal Pacific Northwest National Laboratory (PNNL), Richland, WA (United States)...

  12. Nuclear magnetic resonance measurement of ammonia diffusion in...

    Office of Scientific and Technical Information (OSTI)

    A. Pacific Northwest National Lab., Richland, WA (United States) 40 CHEMISTRY; 05 NUCLEAR FUELS; LIQUID WASTES; AMMONIA; GAS ANALYSIS; HANFORD RESERVATION; RADIOACTIVE WASTE...

  13. Instrument Development Tethered Balloon Sounding System for Vertical...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tethered Balloon Sounding System for Vertical Radiation Profiles C. D. Whiteman J. M. Alzheimer G. A. Anderson M. R. Garnich W. J. Shaw Pacific Northwest Laboratory Richland, WA...

  14. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    Board (AB) (United States) Ohio Field Office, Miamisburg, OH (United States) PNNL Microscopy Data Portal Pacific Northwest National Laboratory (PNNL), Richland, WA (United...

  15. Category:Seattle, WA | Open Energy Information

    Open Energy Info (EERE)

    Seattle, WA Jump to: navigation, search Go Back to PV Economics By Location Media in category "Seattle, WA" The following 16 files are in this category, out of 16 total....

  16. BayWa Group | Open Energy Information

    Open Energy Info (EERE)

    BayWa Group Jump to: navigation, search Name: BayWa Group Place: Munich, Germany Zip: 81925 Sector: Services, Solar Product: Germany-based company with international operations...

  17. Pacific Northwest National Laboratory Facility Radionuclide Emissions Units and Sampling Systems

    SciTech Connect (OSTI)

    Barnett, J. M.; Brown, Jason H.; Walker, Brian A.

    2012-04-01

    Battelle-Pacific Northwest Division operates numerous research and development (R and D) laboratories in Richland, WA, including those associated with Pacific Northwest National Laboratory (PNNL) on the U.S. Department of Energy (DOE)'s Hanford Site and PNNL Site that have the potential for radionuclide air emissions. The National Emission Standard for Hazardous Air Pollutants (NESHAP 40 CFR 61, Subparts H and I) requires an assessment of all emission units that have the potential for radionuclide air emissions. Potential emissions are assessed annually by PNNL staff members. Sampling, monitoring, and other regulatory compliance requirements are designated based upon the potential-to-emit dose criteria found in the regulations. The purpose of this document is to describe the facility radionuclide air emission sampling program and provide current and historical facility emission unit system performance, operation, and design information. For sampled systems, a description of the buildings, exhaust units, control technologies, and sample extraction details is provided for each registered emission unit. Additionally, applicable stack sampler configuration drawings, figures, and photographs are provided. Deregistered emission unit details are provided as necessary for up to 5 years post closure.

  18. Much Accomplished at Hanford in 2010: Richland Operations Office Prime Contractors Cite Past Year's Cleanup Progress

    Broader source: Energy.gov [DOE]

    RICHLAND, WASH. – The Department of Energy (DOE) Richland Operations Office contractors achieved a great deal of cleanup progress at the Hanford Site in 2010.

  19. EMs Richland Operations Office Celebrates Disposal Achievement in 2013

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. EM's Richland Operations Office's 2013 accomplishments ranged from cleaning up buildings and waste sites to treating a record amount of groundwater.

  20. ARM Tropical Western Pacific (TWP) Operations Management and Support: Securing ARM Data

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tropical Western Pacific (TWP) Operations Management and Support: Securing ARM Data K. L. Nitschke South Pacific Regional Environment Programme Apia, Samoa L. Jones Los Alamos National Laboratory Los Alamos, New Mexico C. N. Long Pacific Northwest National Laboratory Richland, Washington Introduction The Tropical Western Pacific Office (TWPO) (a) has been tasked with providing operational management and support for three (b) climate station instrument facilities in the Tropical Western pacific

  1. Advance Patent Waiver W(A)2011-006 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    WA05022DOWCHEMICALCOMPANYWaiverofdomesticandForeig.pdf WA04033CARGILLWaiverofPatentRightstoCARGILLDOWNL.pdf WA00022CARGILLDOWPOLYMERSLLCWaiverofDomest...

  2. Josh Allen of Richland Operations Office Named 2014 Facility...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Each year the Department presents the FR of the Year Award to recognize superior service. Mr. Joshua S. Allen from the Richland Operations Office was selected from a field of ...

  3. Independent Activity Report, Richland Operations Office - April 2011 |

    Office of Environmental Management (EM)

    Department of Energy Richland Operations Office - April 2011 Independent Activity Report, Richland Operations Office - April 2011 April 2011 Operational Awareness Review of the Hanford Sludge Treatment Project [HIAR-RL-2011-04-07] This Independent Activity Report documents operational awareness activities conducted by Office of Health, Safety and Security's Office of Safety and Emergency Management Evaluations between November 2010 and April 2011 at the Hanford Site Sludge Treatment Project.

  4. Richland Environmental Restoration Project management action process document

    SciTech Connect (OSTI)

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines.

  5. Rock the Watt: An Energy Conservation Campaign at Pacific Northwest

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    National Lab | Department of Energy Rock the Watt: An Energy Conservation Campaign at Pacific Northwest National Lab Rock the Watt: An Energy Conservation Campaign at Pacific Northwest National Lab Case study describes Pacific Northwest National Laboratory's (PNNL) three-month Rock the Watt campaign to reduce energy use at its main campus in Richland, Washington. The campaign objectives were to educate PNNL employees about energy conservation opportunities in their workplace and to motivate

  6. Session 6 - Environmentally Concerned Public Sector Panel Discussion "The

    Broader source: Energy.gov (indexed) [DOE]

    Advanced Building Control Solutions Lead Performer: Pacific Northwest National Laboratory (PNNL) - Richland, WA Partners: -- Oak Ridge National Laboratory (ORNL) - Oak Ridge, TN -- Lawrence Berkeley National Laboratory (LBNL) - Berkeley, CA Advanced Open-Source Sensor Packages for Building Monitoring Lead Performer: Oak Ridge National Laboratory (ORNL) - Oak Ridge, TN Partners: -- Pacific Northwest National Laboratory (PNNL) - Richland, WA -- Lawrence Berkeley National Laboratory (LBNL) -

  7. EIS-0275: Disposal of the S1C Prototype Reactor Plant, Hanford Site, Richland, WA (Navy Document)

    Broader source: Energy.gov [DOE]

    This EIS analyzes the Office of Naval Reactors (Naval Reactors) proposed action to dismantle the defueled S1C Prototype reactor plant.

  8. EM Richland Operations Office Manager Reflects on River Corridor's Safe, Successful Cleanup

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. – This month, Stacy L. Charboneau marks her first year as manager of EM’s Richland Operations Office (RL), responsible for management and oversight of cleanup of the 586-square-mile Hanford Site.

  9. Removal of 1,082-Ton Reactor Among Richland Operations Office’s 2014 Accomplishments

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. – Workers with EM’s Richland Operations Office and its contractors made progress this year in several areas of Hanford site cleanup that helped protect employees, the public, environment, and Columbia River.

  10. Patterns of Convection in the Tropical Western Pacific

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Patterns of Convection in the Tropical Western Pacific J. H. Mather Pacific Northwest National Laboratory Richland, Washington Introduction Convection is ubiquitous throughout the maritime continent region. However, the frequency of convec- tion is not uniform. While much of this region does not experience seasons to the same degree as one finds in mid-latitudes, the annual cycle of the sun's passage does have a large impact on convection throughout the maritime continent and the tropical

  11. Independent Activity Report, Richland Operations Office - June 2011 |

    Office of Environmental Management (EM)

    Department of Energy June 2011 Independent Activity Report, Richland Operations Office - June 2011 June 2011 Hanford Sludge Treatment Project Review [HIAR-RL-2011-06-17] This Independent Activity Report documents an operational awareness activity conducted by Office of Health, Safety and Security's Office of Safety and Emergency Management Evaluations June 13-17, 2011, at the Sludge Treatment Project at the Department of Energy's (DOE) Hanford Site. The activity consisted of touring project

  12. Advance Patent Waiver W(A)2002-023 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2-023 Advance Patent Waiver W(A)2002-023 PDF icon Advance Patent Waiver W(A)2002-023 More Documents & Publications Advance Patent Waiver W(A)2006-028 WA05056IBMWATSONRESEARCH...

  13. WA_00_022_CARGILL_DOW_POLYMERS_LLC_Waiver_of_Domestic_and_Fo...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    22CARGILLDOWPOLYMERSLLCWaiverofDomesticandFo.pdf WA00022CARGILLDOWPOLYMERSLLCWaiverofDomesticandFo.pdf PDF icon WA00022CARGILLDOWPOLYMERSLLCWaiverofDom...

  14. WA_98_001_REYNOLDS_METALS_COMPANY_Waiver_of_Domestic_and_For...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8001REYNOLDSMETALSCOMPANYWaiverofDomesticandFor.pdf WA98001REYNOLDSMETALSCOMPANYWaiverofDomesticandFor.pdf PDF icon WA98001REYNOLDSMETALSCOMPANYWaiverofD...

  15. WA_02_035_BP_SOLAR_INTERNATIONAL_Waiver_of_Domestic_and_Fore...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    INTERNATIONALWaiverofDomesticandFore.pdf More Documents & Publications WA06016BPSOLARINTERNATIONALWaiverofPatentRightsUnd.pdf WA02034BPSOLARINTERNATIONALLLCW...

  16. WA_03_010_SHELL_SOLAR_INDUSTRIES_Waiver_of_Domestic_and_Fore...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    INDUSTRIESWaiverofDomesticandFore.pdf More Documents & Publications WA02039SHELLSOLARSYSTEMSWaiverofPatentRightsUnder.pdf WA05059SHELLSOLARINDUSTRIESLPWaive...

  17. Mark R. Hahn of the Richland Operations Office presented 2014 Safety System

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oversight Annual Award | Department of Energy Mark R. Hahn of the Richland Operations Office presented 2014 Safety System Oversight Annual Award Mark R. Hahn of the Richland Operations Office presented 2014 Safety System Oversight Annual Award May 21, 2015 - 1:18pm Addthis Mark R. Hahn of the Richland Operations Office presented 2014 Safety System Oversight Annual Award About 70 Department of Energy (DOE) federal employees serve as Safety System Oversight (SSO) personnel, providing federal

  18. 2013 Annual Planning Summary for the Office of River Protection and Richland Operations Office

    Broader source: Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2013 and 2014 within the Office of River Protection and Richland Operations Office.

  19. EIS-0119: Decommissioning of Eight Surplus Production Reactors at the Hanford Site, Richland, Washington

    Broader source: Energy.gov [DOE]

    This EIS presents analyses of potential environmental impacts of decommissioning the eight surplus production reactors at the Hanford Site near Richland, Washington.

  20. Voluntary Protection Program Onsite Review, Fluor Federal Services Richland, Washington- June 2008

    Broader source: Energy.gov [DOE]

    Evaluation to determine whether Fluor Federal Services in Richland, Washington is continuing to perform at a level deserving DOE-VPP Star recognition.

  1. Physical Sciences Facility at the Pacific Northwest National Laboratory, Richland, Washington

    Energy Savers [EERE]

    Quantum Efficiency Basics Photovoltaic Cell Quantum Efficiency Basics August 20, 2013 - 3:05pm Addthis Quantum efficiency (QE) is the ratio of the number of charge carriers collected by a photovoltaic (PV) cell to the number of photons-or packets of light-of a given energy shining on the solar cell. Quantum efficiency therefore relates to the response of a solar cell to the various wavelengths in the spectrum of light shining on the cell. The QE is given as a function of either wavelength or

  2. Richland Environmental Restoration Project management action process document

    SciTech Connect (OSTI)

    1996-04-01

    A critical mission of the U.S. Department of Energy (DOE) is the planning, implementation, and completion of environmental restoration programs at DOE facilities. An integral part of this mission involves the safe and cost-effective environmental restoration of the Hanford Site. For over 40 years the Hanford Site supported United States national defense programs, largely through the production of nuclear materials. One legacy of historical Hanford Site operations is a significant waste inventory of radioactive and/or regulated chemical materials. Releases of these materials have, in some cases, contaminated the Hanford Site environment. The DOE Richland Operations Office (RL) is responsible for protecting human health and the environment from potential Hanford Site environmental hazards by identifying, assessing, and mitigating risks posed by contaminated sites.

  3. Independent Oversight Review, Richland Operations Office and CH2M Hill Plateau Remediation Company and Mission Support Alliance- April 2012

    Broader source: Energy.gov [DOE]

    Review of Richland Operations Office and CH2M Hill Plateau Remediation Company and Mission Support Alliance Conduct of Operations

  4. Rock the Watt: An Energy Conservation Campaign at Pacific Northwest National Lab

    SciTech Connect (OSTI)

    2016-01-01

    Case study describes Pacific Northwest National Laboratory's (PNNL) three-month Rock the Watt campaign to reduce energy use at its main campus in Richland, Washington. The campaign objectives were to educate PNNL employees about energy conservation opportunities in their workplace and to motivate them to help PNNL save energy and costs and to reduce greenhouse gas emissions.

  5. Environmental Assessments (EA) / Environmental Impact Statements...

    Office of Science (SC) Website

    Resources Contact Information Pacific Northwest Site Office U.S. Department of Energy P.O. Box 350, MS K9-42 Richland, WA 99352 P: (509) 372-4005 National Environmental Policy...

  6. Operations & Maintenance Best Practices Guide: Release 3.0

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Please send or fax your information to: Bill Sandusky Pacific Northwest National Laboratory (PNNL) P.O. Box 999, MS K5-08 Richland, WA 99352 email: bill.sandusky@pnl.gov ...

  7. Chromium Speciation and Mobility in a High Level Nuclear Waste...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 John M. Zachara1 Calvin C. Ainsworth,1 Gordon E. Brown, Jr.,2 and Jeffrey G. Catalano2 1Pacific Northwest National Laboratory, Richland, WA 2Stanford University, Stanford, CA...

  8. RAPID/Roadmap/19-WA-e | Open Energy Information

    Open Energy Info (EERE)

    Permitting Information Desktop Toolkit BETA About Bulk Transmission Geothermal Hydropower Solar Tools Contribute Contact Us Water Well Notice of Intent for New Well (19-WA-e) A...

  9. RAPID/Roadmap/11-WA-b | Open Energy Information

    Open Energy Info (EERE)

    Permitting Information Desktop Toolkit BETA About Bulk Transmission Geothermal Hydropower Solar Tools Contribute Contact Us Human Remains Process (11-WA-b) This flowchart...

  10. RAPID/Roadmap/5-WA-a | Open Energy Information

    Open Energy Info (EERE)

    Geothermal Hydropower Solar Tools Contribute Contact Us Drilling and Well Development (5-WA-a) In Washington geothermal drilling and well development are regulated by the...

  11. RAPID/Roadmap/14-WA-c | Open Energy Information

    Open Energy Info (EERE)

    Geothermal Hydropower Solar Tools Contribute Contact Us Underground Injection Control Permit (14-WA-c) The Safe Drinking Water Act requires Washington to implement...

  12. RAPID/Roadmap/18-WA-b | Open Energy Information

    Open Energy Info (EERE)

    Transmission Geothermal Hydropower Solar Tools Contribute Contact Us Dangerous Solid Waste Permit (18-WA-b) The Washington State Department of Ecology (WSDE) oversees the...

  13. RAPID/Roadmap/14-WA-b | Open Energy Information

    Open Energy Info (EERE)

    RAPIDRoadmap14-WA-b < RAPID | Roadmap Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA About Bulk Transmission Geothermal...

  14. RAPID/Roadmap/15-WA-a | Open Energy Information

    Open Energy Info (EERE)

    BETA About Bulk Transmission Geothermal Hydropower Solar Tools Contribute Contact Us Air Quality Permit - Notice of Construction Permit (15-WA-a) This flowchart illustrates...

  15. RAPID/Roadmap/15-WA-b | Open Energy Information

    Open Energy Info (EERE)

    BETA About Bulk Transmission Geothermal Hydropower Solar Tools Contribute Contact Us Air Quality Permit - Operating Permit (15-WA-b) This flowchart illustrates the process for...

  16. RAPID/Roadmap/12-WA-b | Open Energy Information

    Open Energy Info (EERE)

    Geothermal Hydropower Solar Tools Contribute Contact Us State Trust Lands Habitat Conservation Plan Compliance (12-WA-b) The State of Washington has a Habitat Conservation Plan...

  17. RAPID/Roadmap/19-WA-d | Open Energy Information

    Open Energy Info (EERE)

    BETA About Bulk Transmission Geothermal Hydropower Solar Tools Contribute Contact Us Water Conservancy Board Transfer or Change of Water Right (19-WA-d) In 1997, the Washington...

  18. RAPID/Roadmap/19-WA-c | Open Energy Information

    Open Energy Info (EERE)

    Geothermal Hydropower Solar Tools Contribute Contact Us Transfer or Change of Water Right (19-WA-c) Much of Washington's public waters have been accounted for through...

  19. RAPID/Roadmap/19-WA-b | Open Energy Information

    Open Energy Info (EERE)

    About Bulk Transmission Geothermal Hydropower Solar Tools Contribute Contact Us New Water Right Permit Process (19-WA-b) Washington uses a prior appropriation system for the...

  20. Microbase Cloud Products and Associated Heating Rates in the Tropical Western Pacific

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Microbase Cloud Products and Associated Heating Rates in the Tropical Western Pacific J. H. Mather and S. A. McFarlane Pacific Northwest National Laboratory Richland, Washington Introduction The microbase value added product (Miller et al. 2003) provides a standardized framework for calculating and storing continuous retrievals of cloud microphysical properties including liquid water content (LWC), ice water content (IWC), and cloud droplet size. Microbase is part of the larger broadband heating

  1. Pacific Northwest National Laboratory Annual Site Environmental Report for Calendar Year 2013

    SciTech Connect (OSTI)

    Duncan, Joanne P.; Sackschewsky, Michael R.; Tilden, Harold T.; Barnett, J. M.; Su-Coker, Jennifer; Ballinger, Marcel Y.; Fritz, Brad G.; Stoetzel, Gregory A.; Lowry, Kami L.; Moon, Thomas W.; Becker, James M.; Mendez, Keith M.; Raney, Elizabeth A.; Chamness, Michele A.; Larson, Kyle B.

    2014-09-30

    Pacific Northwest National Laboratory (PNNL), one of the U.S. Department of Energy (DOE) Office of Science’s 10 national laboratories, provides innovative science and technology development in the areas of energy and the environment, fundamental and computational science, and national security. DOE’s Pacific Northwest Site Office (PNSO) is responsible for oversight of PNNL at its Campus in Richland, Washington, as well as its facilities in Sequim, Seattle, and North Bonneville, Washington, and Corvallis and Portland, Oregon.

  2. Pacific Northwest National Laboratory Institutional Plan FY 2004-2008

    SciTech Connect (OSTI)

    Quadrel, Marilyn J.

    2004-04-15

    This Institutional Plan for FY 2004-2008 is the principal annual planning document submitted to the Department of Energy's Office of Science by Pacific Northwest National Laboratory in Richland, Washington. This plan describes the Laboratory's mission, roles, and technical capabilities in support of Department of Energy priorities, missions, and plans. It also describes the Laboratory strategic plan, key planning assumptions, major research initiatives, and program strategy for fundamental science, energy resources, environmental quality, and national security.

  3. DOE - Office of Legacy Management -- Hanford Engineer Works - WA 01

    Office of Legacy Management (LM)

    Hanford Engineer Works - WA 01 FUSRAP Considered Sites Site: Hanford Engineer Works (WA.01 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see http://www.hanford.gov/ Documents Related to Hanford Engineer Works

  4. WA_06_016_BP_SOLAR_INTERNATIONAL_Waiver_of_Patent_Rights_Und...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    06016BPSOLARINTERNATIONALWaiverofPatentRightsUnd.pdf WA06016BPSOLARINTERNATIONALWaiverofPatentRightsUnd.pdf PDF icon WA06016BPSOLARINTERNATIONALWaiverofP...

  5. WA_04_033_CARGILL_Waiver_of_Patent_Rights_to_CARGILL_DOWN_L.pdf...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    33CARGILLWaiverofPatentRightstoCARGILLDOWNL.pdf WA04033CARGILLWaiverofPatentRightstoCARGILLDOWNL.pdf PDF icon WA04033CARGILLWaiverofPatentRightstoCARGI...

  6. WA_02_034_BP_SOLAR_INTERNATIONAL_LLC_Waiver_of_Domestic_and_...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    verofDomesticand.pdf More Documents & Publications WA02035BPSOLARINTERNATIONALWaiverofDomesticandFore.pdf WA06016BPSOLARINTERNATIONALWaiverofPatentRightsUnd...

  7. DOE Recognizes EM Richland Operations Office Employees for Excellence in Safety, Cost Savings

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – DOE has honored three EM Richland Operations Office (RL) employees with awards for their exemplary service, dedication to safety, and a cost-savings initiative.

  8. EA-1211: Relocation and Storage of Isotopic Heat Sources, Hanford Site, Richland, Washington

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts for the proposal for relocation and storage of the isotopic heat sources at the U.S. Department of Energy Hanford Site in Richland, Washington.

  9. DOE Issues Request for Information for Richland Operations Office Richland Acquisitions – Post Fiscal Year 2018 Contract(s) Acquisition Planning

    Broader source: Energy.gov [DOE]

    Cincinnati -- The U.S. Department of Energy (DOE) Environmental Management Consolidated Business Center today issued a Sources Sought/Request for Information (RFI) seeking interested parties with specialized capabilities necessary to successfully perform all or a portion of the elements of scope for a potential upcoming competitive Environmental Management (EM) procurement(s) for the environmental cleanup projects and Hanford Site infrastructure and services at the Richland Operations Office (RL), hereafter referred to as “Richland Acquisitions – Post Fiscal Year 2018 Contract(s)” and to further determine whether or not all or a portion of the work can be set-aside for small and disadvantaged businesses.

  10. Environmental Management Richland Operations Office FY 2014 President's Budget FY 2015 Budget Request Regulator Briefing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Public Briefing FY 2013 Appropriations FY 2014 President's Budget FY 2015 Budget Request Jon Peschong, Richland Operations Office Central Plateau and River Corridor May 8, 2013 Draft Pre-Decisional Information Public Briefing - Richland Operations Office May 2013 Draft Pre-Decisional Information 2 "Complete the safe cleanup of the environmental legacy brought about from five decades of nuclear weapons development, production, and Government-sponsored nuclear energy research" EM

  11. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE/EIS-0391 Final Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington Summary U.S. Department of Energy November 2012 1 Cover Sheet Responsible Agency: U.S. Department of Energy (DOE) Cooperating Agencies: Washington State Department of Ecology (Ecology) U.S. Environmental Protection Agency (EPA) Title: Final Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington (TC & WM EIS)

  12. Final Environmental Impact Statement for the Tank Waste Remediation System, Hanford Site, Richland, Washington

    Office of Environmental Management (EM)

    1996/01coversheet.htm[6/27/2011 11:34:32 AM] NEPA COVER SHEET TITLE: Final Environmental Impact Statement for the Tank Waste Remediation System, Hanford Site, Richland, Washington RESPONSIBLE AGENCIES: Lead Federal Agency: U.S. Department of Energy (DOE), Richland Operations Office; Lead State Agency: Washington State Department of Ecology (Ecology). ABSTRACT: This document analyzes the potential environmental consequences related to the Hanford Site Tank Waste Remediation System (TWRS)

  13. EA-1915: Proposed Conveyance of Land at the Hanford Site, Richland,

    Energy Savers [EERE]

    Washington | Department of Energy 15: Proposed Conveyance of Land at the Hanford Site, Richland, Washington EA-1915: Proposed Conveyance of Land at the Hanford Site, Richland, Washington Summary The EA assesses the potential environmental effects of conveying approximately 1,641 acres of Hanford Site land to the local economic development organization, the Tri-City Development Council (TRIDEC), a DOE-recognized Community Reuse Organization. TRIDEC has requested the transfer of land located

  14. RAPID/Roadmap/6-WA-a | Open Energy Information

    Open Energy Info (EERE)

    in the Washington Administrative Code. 6-WA-a - Oversize-Overweight Load Permit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number...

  15. RAPID/Roadmap/3-WA-b | Open Energy Information

    Open Energy Info (EERE)

    the Washington State Department of Natural Resources. 3-WA-b - Land Access Overview.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number...

  16. Hanford, WA Selected as Plutonium Production Facility | National...

    National Nuclear Security Administration (NNSA)

    Production Facility Hanford, WA Groves selects Hanford, Washington, as site for full-scale plutonium production and separation facilities. Three reactors--B, D, and F--are built....

  17. BayWa Sunways JV | Open Energy Information

    Open Energy Info (EERE)

    JV that specialises in developing, planning and realizing medium-sized to large photovoltaic systems and solar plants. References: BayWa & Sunways JV1 This article is a stub....

  18. RAPID/Roadmap/19-WA-a | Open Energy Information

    Open Energy Info (EERE)

    BETA About Bulk Transmission Geothermal Hydropower Solar Tools Contribute Contact Us Water Access and Water Rights Overview (19-WA-a) Pursuant to RCW 78.60.060, developers that...

  19. Record of Decision for the Tank Waste Remediation System, Hanford Site, Richland, WA (DOE/EIS-0189), 2/26/97

    Office of Environmental Management (EM)

    93 Federal Register / Vol. 62, No. 38 / Wednesday, February 26, 1997 / Notices National Educational Research Policy and Priorities Board; Meeting AGENCY: National Educational Research Policy and Priorities Board; Education. ACTION: Notice of Meeting. SUMMARY: This notice sets forth the schedule and proposed agenda of a forthcoming meeting of the National Educational Research Policy and Priorities Board. This notice also describes the functions of the Board. Notice of this meeting is required

  20. Pacific Ethanol, Inc | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pacific Ethanol, Inc

  1. Media Contact: Mark Heeter, DOE Richland Operations Office, 509-373-1970

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mark Heeter, DOE Richland Operations Office, 509-373-1970 For Immediate Release March 31, 2016 Manhattan Project National Historical Park at Hanford Expands 2016 Tour Season RICHLAND, Wash. - In partnership with the National Park Service (NPS), the U.S. Department of Energy (DOE) will open registration for the Manhattan Project National Historical Park's 2016 public tour season at the Hanford, Wash., sites on Monday, April 4, at 8:00 a.m. PDT. Hanford is one of the three primary Manhattan

  2. About | U.S. DOE Office of Science (SC)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    About Pacific Northwest Site Office (PNSO) PNSO Home About Organization Chart .pdf file (275KB) Jobs Projects Contract Management NEPA Documents Resources Contact Information Pacific Northwest Site Office U.S. Department of Energy P.O. Box 350, MS K9-42 Richland, WA 99352 P: (509) 372-4005 About Print Text Size: A A A FeedbackShare Page Located in Richland, Washington, the Pacific Northwest Site Office (PNSO) provides programmatic, operational, and institutional stewardship and oversight of the

  3. WA_1994_003_GOLDEN_PHOTOCON_INC_Waiver_of_Domestic_and_Forei.pdf |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy WA_1994_003_GOLDEN_PHOTOCON_INC_Waiver_of_Domestic_and_Forei.pdf WA_1994_003_GOLDEN_PHOTOCON_INC_Waiver_of_Domestic_and_Forei.pdf PDF icon WA_1994_003_GOLDEN_PHOTOCON_INC_Waiver_of_Domestic_and_Forei.pdf More Documents & Publications WA_1995_030_GOLDEN_PHOTON_INC_Waiver_of_Domestic_and_Foreign.pdf WA_1993_033_GOLDEN_PHOTON_INC_Waiver_of_Domestic_and_Foreign.pdf WA_03_010_SHELL_SOLAR_INDUSTRIES_Waiver_of_Domestic_and_Fore.pdf

  4. VOLUNTARY PROTECTION PROGRAM ONSITE REVIEW, Fluor Federal Services Richland, Washington February 26- March 2, 2001

    Broader source: Energy.gov [DOE]

    This report summarizes the results of the HSS DOE-VPP Team’s evaluation of Fluor Federal Services Richland, Washington during the period of February 26 - March 2, 2001, and provides the Chief Health, Safety and Security Officer with the necessary information to make the final decision regarding the company’s continued participation in DOE-VPP as a Star site.

  5. Sumas, WA Liquefied Natural Gas Imports (Million Cubic Feet)

    U.S. Energy Information Administration (EIA) Indexed Site

    (Million Cubic Feet) Sumas, WA Liquefied Natural Gas Imports (Million Cubic Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2014 5 2015 4 4 2 1 2016 1 2 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 4/29/2016 Next Release Date: 5/31/2016 Referring Pages: U.S. Liquefied Natural Gas Imports by Point of Entry Sumas, WA LNG Imports from All Countries

  6. Climate Action Champions: Seattle, WA | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Seattle, WA Climate Action Champions: Seattle, WA The City of Seattle has long been at the leading edge of environmental innovation. Seattle has been recycling for over 25 years and today has one of the highest recycling and composting rates nationwide. In 2005, Seattle City Light became the first electric utility in the nation to be carbon neutral. Recently, Seattle was recognized as the “most sustainable city in the nation” by STAR communities with a 5-STAR rating and the highest

  7. Microsoft Word - WA Parish_MAP_Final.docx

    Energy Savers [EERE]

    W.A. Parish Post-Combustion CO 2 Capture and Sequestration Project U. S. Department of Energy National Energy Technology Laboratory June 2013 INTRODUCTION: The United States (U.S.) Department of Energy (DOE) issued a final environmental impact statement (EIS; DOE/EIS-0473) for the W.A. Parish Post-Combustion CO 2 Capture and Sequestration Project (Parish PCCS Project) in March 2013. DOE announced its decision to provide $167 million in cost-shared funding to NRG Energy, Inc. (NRG) for the

  8. DOE, City of Richland and Benton PUD Increase Fiber Optic Telecommunication Capacity in Benton County- Upgrade improves communications at Hanford Site, schools and libraries

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. ― The Department of Energy (DOE), city of Richland, and Benton County’s Public Utility District (Benton PUD) jointly implemented a high-capacity fiber optic cable in Richland and at the Hanford Site. The project will improve communications throughout the area.

  9. File:06-WA-b - Washington Construction Storm Water Permit.pdf...

    Open Energy Info (EERE)

    6-WA-b - Washington Construction Storm Water Permit.pdf Jump to: navigation, search File File history File usage Metadata File:06-WA-b - Washington Construction Storm Water...

  10. Mechanism of somatic hypermutation at the WA motif by human DNA...

    Office of Scientific and Technical Information (OSTI)

    at the WA motif by human DNA polymerase eta Citation Details In-Document Search Title: Mechanism of somatic hypermutation at the WA motif by human DNA polymerase eta Authors: ...

  11. EIS-0397: Lyle Falls Fish Passage Project, WA

    Broader source: Energy.gov [DOE]

    This EIS analyzes BPA's decision to modify funding to the existing Lyle Falls Fishway on the lower Klickitat River in Klickitat County, WA. The proposed project would help BPA meet its off-site mitigation responsibilities for anadromous fish affected by the development of the Federal Columbia River Power System and increase overall fish production in the Columbia Basin.

  12. Dave Roberts POBox

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    .*..* -. - Dave Roberts POBox 524 Richland, WA 99352 September 10,2012 Office of River Protection POBox 550 Richland, WA 99352 Re: Freedom of Information Request Dear Sir or...

  13. WA_01_018_IBM_Waiver_of_Governement_US_and_Foreign_Patent_Ri.pdf |

    Energy Savers [EERE]

    Department of Energy 1_018_IBM_Waiver_of_Governement_US_and_Foreign_Patent_Ri.pdf WA_01_018_IBM_Waiver_of_Governement_US_and_Foreign_Patent_Ri.pdf PDF icon WA_01_018_IBM_Waiver_of_Governement_US_and_Foreign_Patent_Ri.pdf More Documents & Publications WA_04_053_IBM_CORP_Waiver_of_the_Government_U.S._and_Foreign.pdf WA_00_015_COMPAQ_FEDERAL_LLC_Waiver_Domestic_and_Foreign_Pat.pdf Advance Patent Waiver W(A)2002-023

  14. WA_04_047_CATERPILLAR_INC_Waiver_of_Patent_Rights_to_Inventi.pdf |

    Energy Savers [EERE]

    Department of Energy 47_CATERPILLAR_INC_Waiver_of_Patent_Rights_to_Inventi.pdf WA_04_047_CATERPILLAR_INC_Waiver_of_Patent_Rights_to_Inventi.pdf PDF icon WA_04_047_CATERPILLAR_INC_Waiver_of_Patent_Rights_to_Inventi.pdf More Documents & Publications WA_04_046_CATERPILLAR_INC_Waiver_of_Patent_Rights_to_Inventi.pdf WA_04_071_CATERPILLAR_INC_Waiver_of_Patent_Rights_to_Inventi.pdf Advance Patent Waiver W(A)2005-052

  15. WA_04_069__EATON_CORPORATION_Waiver_of_Domestic_and_Foreign_.pdf |

    Energy Savers [EERE]

    Department of Energy 69__EATON_CORPORATION_Waiver_of_Domestic_and_Foreign_.pdf WA_04_069__EATON_CORPORATION_Waiver_of_Domestic_and_Foreign_.pdf PDF icon WA_04_069__EATON_CORPORATION_Waiver_of_Domestic_and_Foreign_.pdf More Documents & Publications WA_04_059_EATON_CORPORATION_Waiver_of_Patent_Rights_Under_a_.pdf WA_02_048_EATON_CORPORATION_Waviver_of_Patent_Rights_Under_A.pdf WA_04_074_EATON_CORPORATION_Waiver_of_Domestic_and_Foreign_I.pdf

  16. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    APPENDIX B CONTRACTOR AND SUBCONTRACTOR NATIONAL ENVIRONMENTAL POLICY ACT DISCLOSURE STATEMENTS NATIONAL ENVIRONMENTAL POLICY ACT DISCLOSURE STATEMENT FOR PREPARATION OF THE TANK CLOSURE AND WASTE MANAGEMENT ENVIRONMENTAL IMPACT STATEMENT FOR THE HANFORD SITE, RICHLAND, WASHINGTON The Council of Environmental Quality regulations at Title 40 of the Code of Federal Regulatiolls (CFR), Section 1506.5(c), which have been adopted by the U.S. Department of Energy (10 CFR 1021), require contractors and

  17. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    E-1 APPENDIX E DESCRIPTIONS OF FACILITIES, OPERATIONS, AND TECHNOLOGIES Appendix E provides additional information about the technologies, processes, and facilities for the three key activities of this Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington: tank closure, Fast Flux Test Facility decommissioning, and waste management. Section E.1 includes this information for tank closure; Section E.2, for Fast Flux Test Facility

  18. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    APPENDIX F DIRECT AND INDIRECT IMPACTS: ASSESSMENT METHODOLOGY This appendix briefly describes the methods used to assess the potential direct and indirect effects of the alternatives in this Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington. Included in this appendix are discussions of general impact assessment methodologies for land resources, infrastructure, noise and vibration, air quality, geology and soils, water resources,

  19. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    G-1 APPENDIX G AIR QUALITY ANALYSIS This appendix presents information on the nonradiological air quality impacts that could result from emissions associated with construction, operations, deactivation, and closure activities under the various alternatives described in this Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington. The impacts of criteria pollutants and toxic air pollutants were assessed by comparing estimated concentrations with

  20. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    J-1 APPENDIX J ENVIRONMENTAL JUSTICE This appendix provides an assessment of the potential for disproportionately high and adverse human health or environmental effects on minority and low-income populations resulting from implementation of the alternatives described in Chapter 2 of this Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington. J.1 INTRODUCTION Environmental justice is defined as "the fair treatment and meaningful

  1. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    L-1 APPENDIX L GROUNDWATER FLOW FIELD DEVELOPMENT This appendix describes the development of the regional-scale groundwater flow field used for the groundwater modeling that supports assessment of the groundwater quality impacts discussed in the Draft and Final Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington (TC & WM EIS), Chapters 5 and 6 and Appendices O and V. Included are an overview of groundwater flow at the site; the purpose

  2. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    P-1 APPENDIX P ECOLOGICAL RESOURCES AND RISK ANALYSIS This appendix presents the ecological resources (see Section P.1) at the Hanford Site and lists the plants and animals evaluated in this Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington. Potential impacts of both airborne releases during operations and groundwater discharges under the various alternatives are evaluated in this appendix. The purpose of the risk analysis is to compare

  3. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    R-1 APPENDIX R CUMULATIVE IMPACTS: ASSESSMENT METHODOLOGY This appendix describes the cumulative impacts methodology for the U.S. Department of Energy's Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington. The appendix is organized into sections on (1) regulations and guidance, (2) previous studies, (3) history of land use at the Hanford Site and in surrounding regions, (4) future land use at the Hanford Site, (5) future land use in

  4. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    APPENDIX S WASTE INVENTORIES FOR CUMULATIVE IMPACT ANALYSES Integral to development of the inventory data set for the cumulative impact analyses presented in this Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington was identification of those waste sites potentially contributing to cumulative impacts on groundwater. Their identification involved two semi-independent, convergent processes: a Waste Information Data System screen and a

  5. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    X-1 APPENDIX X SUPPLEMENT ANALYSIS OF THE DRAFT TANK CLOSURE AND WASTE MANAGEMENT ENVIRONMENTAL IMPACT STATEMENT FOR THE HANFORD SITE, RICHLAND, WASHINGTON Consistent with U.S. Department of Energy (DOE) Regulations (10 CFR 1021.314(c)(3)), "DOE shall make the determination and the related Supplement Analysis available to the public for information. Copies of the determination and Supplement Analysis shall be provided upon written request. DOE shall make copies available for inspection in

  6. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    -1 CHAPTER 1 PROPOSED ACTIONS: BACKGROUND, PURPOSE AND NEED Chapter 1 describes the background, purpose and need for the agency action presented in this Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington (TC & WM EIS). Section 1.1 provides summary information on the size and distribution of the waste inventory at the Hanford Site (Hanford), the specific objectives of this TC & WM EIS, and the regulatory basis for the proposed

  7. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for the Hanford Site, Richland, Washington 5-394 5.2 FFTF DECOMMISSIONING ALTERNATIVES This section describes the potential long-term environmental and human health impacts associated with implementation of alternatives considered to decommission FFTF and auxiliary facilities at Hanford; to manage waste from the decommissioning process, including waste designated as remote-handled special components (RH-SCs); and to manage the disposition of the Hanford inventory of radioactively contaminated

  8. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Volume 3, Book 1 Section 1: Overview Section 2: Topics of Interest Section 3: Individual Commentors U.S. Department of Energy November 2012 1 Cover Sheet Responsible Agency: U.S. Department of Energy (DOE) Cooperating Agencies: Washington State Department of Ecology (Ecology) U.S. Environmental Protection Agency (EPA) Title: Final Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington (TC & WM EIS) (DOE/EIS-0391) Location: Benton County,

  9. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reader's Guide U.S. Department of Energy November 2012 1 Cover Sheet Responsible Agency: U.S. Department of Energy (DOE) Cooperating Agencies: Washington State Department of Ecology (Ecology) U.S. Environmental Protection Agency (EPA) Title: Final Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington (TC & WM EIS) (DOE/EIS-0391) Location: Benton County, Washington Contacts: For copies of this Final TC & WM EIS, call toll-free

  10. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cover Sheet Responsible Agency: U.S. Department of Energy (DOE) Cooperating Agencies: Washington State Department of Ecology (Ecology) U.S. Environmental Protection Agency (EPA) Title: Final Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington (TC & WM EIS) (DOE/EIS-0391) Location: Benton County, Washington Contacts: For copies of this Final TC & WM EIS, call toll-free 1-888-829-6347, or contact Mary Beth Burandt at the address

  11. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for the Hanford Site, Richland, Washington (Final TC & WM EIS) Washington State Department of Ecology (Ecology) Foreword Summary Ecology believes that the U.S. Department of Energy (DOE) and its contractor have prepared a Final TC & WM EIS that presents many important issues for discussion. Ecology's involvement in the production of this TC & WM EIS shows that this document has benefited from quality reviews and quality assurance procedures. In addition, this document benefited from

  12. Groundwater Update K. Michael Thompson Soil and Groundwater Division Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Update Jon Peschong Richland Operations Office May 2015 2 billion gallons of contaminated groundwater treated tons of contaminants removed in all pump and treat systems since the facilities began operating 12 171 HANFORD SITE GROUNDWATER NUMBERS billion of gallons of groundwater treated in 2014 1.95 tons of contaminants removed in 2014 62 3 Groundwater Key Focus Areas * Expand pump and treat systems - Continue pump and treat operations - Install and connect new and existing wells to maximize

  13. U.S. Department of Energy, Richland Operations Office And Mission Support Alliance, LLC Partnering Charter For Partnering Performance Agreement

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy, Richland Operations Office (DOE-RL) and the Mission Support Alliance, LLC (MSA) are committed to continuous improvement and will partner together to enchance teaming...

  14. EA-0904: Access Road from State Route 240 to the 200 West Area Hanford Site, Richland, Washington

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of a proposal to construct an access road on the U.S. Department of Energy's Hanford Site in Richland, Washington, from State Route 240 to Beloit Avenue...

  15. EA-1203: Trench 33 Widening in 218-W-5 Low-level Burial Ground, Hanford Site, Richland, Washington

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts for the proposal to widen and operate the unused Trench 33 in the 218-W-5 Low-Level Burial Ground at the U.S. Department of Energy's Richland Operations...

  16. DOE Announces Additional Tour Seats Available: Tours of B Reactor at the Hanford Site Begin and End in Richland, Wash.

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. – The U.S. Department of Energy (DOE) has made additional seats available for tours of the B Reactor National Historic Landmark this July and August.

  17. Resources | U.S. DOE Office of Science (SC)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Resources Pacific Northwest Site Office (PNSO) PNSO Home About Projects Contract Management NEPA Documents Resources Contact Information Pacific Northwest Site Office U.S. Department of Energy P.O. Box 350, MS K9-42 Richland, WA 99352 P: (509) 372-4005 Resources Print Text Size: A A A FeedbackShare Page Contact Pacific Northwest Site Office P.O. Box 350, MS K9-42 Richland, WA 99352 (509) 372-4005 Public Affairs Jacob A. Skeels (509) 372-4365 Email: jacob.skeels@science.doe.gov Links DOE-Battelle

  18. Economics of power plant district and process heating in Richland, Washington

    SciTech Connect (OSTI)

    Fassbender, L.L.; Bloomster, C.H.

    1981-04-01

    The economic feasibility of utilizing hot water from nuclear reactors to provide district heating for private residences in Richland, Washington, and space and process heating for nearby offices, part of the Hanford Reservation, and the Lamb-Weston potato processing plant is assessed. Specifically, the practicality of using hot water from the Washington Public Power Supply System's WNP-1 reactor, which is currently under construction on the Hanford Reservation, just north of the City of Richland is established. World-wide experience with district heating systems and the advantages of using these systems are described. The GEOCITY computer model used to calculate district heating costs is described and the assumptions upon which the costs are based are presented. District heating costs for the city of Richland, process heating costs for the Lamb-Weston potato processing plant, district heating costs for the Horn Rapids triangle area, and process heating costs for the 300 and 3000 areas are discussed. An economic analysis is discussed and institutional restraints are summarized. (MCW)

  19. EA-1562: Construction and Operation of a Physical Sciences Facility at the Pacific Northwest National Laboratory, Richland, Washington

    Broader source: Energy.gov [DOE]

    This EA evaluates the potential environmental impacts of DOE proposed activities associated with constructing and operating a new Physical Sciences Facility (PSF) complex on DOE property located in...

  20. Richland C

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    November 15 to July 31 Hanford Site Boundary Industrial Areas 0 2 4 6 8 10 Miles 0 5 10 15 20 Kilometers Natural Resource Protective Buffer Zones for FY2015 (Version 04-20-15)...

  1. Richland C

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    November 15 to March 15 Hanford Site Boundary Industrial Areas Protected Bald Eagle Winter Night Roost Areas for FY2015 (Version 11-5-15) / 0 2 4 6 8 10 Miles 0 5 10 15 20 Kilometers

  2. Richland C

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    March 1 to July 31 Protected February 15 to July 31 Protected November 15 to March 15 Protected November 15 to July 31 Hanford Site Boundary Industrial Areas / 0 2 4 6 8 10 Miles 0 5 10 15 20 Kilometers Natural Resource Protective Buffer Zones (Version 02-23-16)

  3. Westinghouse P.O. Box 1970 Hanford COlTlpany Richland, Washington 99352

    Office of Scientific and Technical Information (OSTI)

    Westinghouse P.O. Box 1970 Hanford COlTlpany Richland, Washington 99352 Hanford Operations and Engineering Contractor for the U S . Department of Energy under Contract DE-AC06-87RL10930 Approved for Public Release o-vrrorr 91: WHC-MR-0293 Revision 2 _-- Legend and Legacy: Fifty Years of Defense Production at the Hanford Site M. S. Gerber Date Published September 1992 Prepared for the U.S. Department of Energy Office of Environmental Restoration and Waste Manage men t 3 e f e r e n c e WHC-c:

  4. Lead test assembly irradiation and analysis Watts Bar Nuclear Plant, Tennessee and Hanford Site, Richland, Washington

    SciTech Connect (OSTI)

    1997-07-01

    The U.S. Department of Energy (DOE) needs to confirm the viability of using a commercial light water reactor (CLWR) as a potential source for maintaining the nation`s supply of tritium. The Proposed Action discussed in this environmental assessment is a limited scale confirmatory test that would provide DOE with information needed to assess that option. This document contains the environmental assessment results for the Lead test assembly irradiation and analysis for the Watts Bar Nuclear Plant, Tennessee, and the Hanford Site in Richland, Washington.

  5. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 OVERVIEW OF THE PUBLIC COMMENT PROCESS 1-1 SECTION 1 OVERVIEW OF THE PUBLIC COMMENT PROCESS This section of this Comment-Response Document (CRD) describes the public comment process for the Draft Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington (Draft TC & WM EIS) and the procedures used to respond to public comments. Section 1.1 summarizes the organization of this CRD. Section 1.2 discusses the public comment process and the means

  6. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 ▪ Public Comments and DOE Responses 3-1053 Campaign A March 16, 2010 As a resident of the Pacifc Northwest, I oppose the "preferred alternative" to ship nuclear waste from other Department of Energy sites to Hanford, as outlined in the Draft Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington (DOE/EIS--0391). I vehemently oppose the plan to add more radioactive waste to the Hanford site. Shipping this waste along Northwest

  7. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford Site, Richland, Washington (Final TC & WM EIS) U.S. Environmental Protection Agency (EPA), Region 10 Foreword After receiving the EPA comments on the Draft TC & WM EIS, the U.S. Department of Energy (DOE) wrote to the EPA, inviting the EPA to be a cooperating agency in the development of this Final TC & WM EIS. The two agencies signed a memorandum of understanding (MOU) in April 2011 to formalize the EPA"s involvement as a cooperating agency and to define each

  8. WA_97_027_GENERAL_ATOMICS__CORPORATION_Waiver_of_Domestic_an.pdf |

    Energy Savers [EERE]

    Department of Energy 97_027_GENERAL_ATOMICS__CORPORATION_Waiver_of_Domestic_an.pdf WA_97_027_GENERAL_ATOMICS__CORPORATION_Waiver_of_Domestic_an.pdf PDF icon WA_97_027_GENERAL_ATOMICS__CORPORATION_Waiver_of_Domestic_an.pdf More Documents & Publications WA_99_014_UNITED_SOLAR_SYSTEMS_CORP_Waiver_of_Domestic_and_F.pdf Class Patent Waiver W(C)2004-001 WA_97_006_MOTOROLA_MANUFACTURING_SYSTEMS_Waiver_of_Patent_Ri

  9. DOE Zero Energy Ready Home Case Study: TC Legend Homes, Bellingham, WA |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Bellingham, WA DOE Zero Energy Ready Home Case Study: TC Legend Homes, Bellingham, WA DOE Zero Energy Ready Home Case Study: TC Legend Homes, Bellingham, WA Case study of a DOE Zero Energy Ready home in Bellingham, WA, that achieves HERS 43 without PV or HERS 13 with 3.2 kW of PV. The 1,055-ft2 two-story production home has 6-in. SIP walls, a 10-in. SIP roof, and ICF foundation walls with R-20 high-density rigid EPS foam under the slab. A single ductless heat pump heats

  10. 2010 Ecological Survey of the Pacific Northwest National Laboratory Site

    SciTech Connect (OSTI)

    Chamness, Michele A.; Perry, Christopher; Downs, Janelle L.; Powell, Sylvia D.

    2011-02-16

    The U.S. Department of Energy (DOE) Pacific Northwest Site Office (PNSO) oversees and manages the DOE contract for the Pacific Northwest National Laboratory (PNNL), a DOE Office of Science multi-program laboratory located in Richland, Washington. PNSO is responsible for ensuring that all activities conducted on the PNNL Site comply with applicable laws, policies, and DOE orders. The DOE Pacific Northwest Site Office Cultural and Biological Resources Management Plan (DOE/PNSO 2008) addresses the requirement for annual surveys and monitoring for species of concern and to identify and map invasive species. In addition to the requirement for an annual survey, proposed project activities must be reviewed to assess any potential environmental consequences of conducting the project. The assessment process requires a thorough understanding of the resources present, the potential impacts of a proposed action to those resources, and the ultimate consequences of those actions. The PNNL Site is situated on the southeastern corner of the DOE Hanford Site, located at the north end of the city of Richland in south-central Washington. The site is bordered on the east by the Columbia River, on the west by Stevens Drive, and on the north by the Hanford Site 300 Area (Figure 1). The environmental setting of the PNNL Site is described in Larson and Downs (2009). There are currently two facilities on the PNNL Site: the William R. Wiley Environmental Molecular Sciences Laboratory (EMSL), and the recently completed Physical Sciences Facility (PSF). This report describes the results of the annual survey of the biological resources found on the undeveloped portions of the PNNL Site in 2010. A brief description of the methods PNNL ecologists used to conduct the surveys and the results of the surveys are presented. Actions taken to fully delineate noxious weed populations discovered in 2009 and efforts in 2010 to control those weeds also are described. Appendix A provides a list of plant and animal species identified on the PNNL Site.

  11. Translation--Final Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington - FAQs

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Declaración de Impacto Ambiental Final para el Cierre de Tanques y la Administración de Desechos del Establecimiento de Hanford, Richland, Washington (DIAF CC & AD) (Final Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington) (DOE/EIS-0391) Preguntas Frecuentes ¿Cuáles son las acciones propuestas del Departamento de Energía de los Estados Unidos (DDE) (U.S. Department of Energy) presentadas en la DIAF CC & AD? La DIAF CC &

  12. Environmental Monitoring Plan United States Department of Energy Richland Operations Office. Revision 2

    SciTech Connect (OSTI)

    1997-11-10

    This Environmental Monitoring Plan was prepared for the US Department of Energy`s (DOE`s) Richland Operations Office (RL) to implement the requirements of DOE Order 5400.1. According to the Order, each DOE site, facility, or activity that uses, generates, releases, or manages significant pollutants or hazardous materials shall prepare a written environmental monitoring plan covering two major activities: (1) effluent monitoring and (2) environmental surveillance. The plan is to contain information discussing the rationale and design criteria for the monitoring programs, sampling locations and schedules, quality assurance requirements, program implementation procedures, analytical procedures, and reporting requirements. The plan`s purpose is to assist DOE in the management of environmental activities at the Hanford Site and to help ensure that operations on the site are conducted in an environmentally safe and sound manner.

  13. Structural testing of corrugated asbestos-cement roof panels at the Hanford Facilities, Richland, Washington

    SciTech Connect (OSTI)

    Moustafa, S.E.; Rodehaver, S.M.; Frier, W.A.

    1993-10-01

    This report describes a roof testing program that was carried out at the 105KE/KW Spent Fuel Storage Basins and their surrounding facilities at the Hanford Site in Richland, Washington. The roof panels were constructed in the mid 1950`s of corrugated asbestos-cement (A/C), which showed common signs of aging. Based on the construction specifications, the panels capacity to meet current design standards was questioned. Both laboratory and in-situ load testing of the corrugated A/C panels was conducted. The objective of the complete test program was to determine the structural integrity of the existing A/C roof panels installed in the 105KE and 105KW facilities. The data from these tests indicated that the roofs are capable of resisting the design loads and are considered safe. A second phase test to address the roof resistance to personnel and roof removal/roofing system installation equipment was recommended and is underway.

  14. Evaluation of Machine Guarding course taught in Richland, Washington, September 1--3, 1992

    SciTech Connect (OSTI)

    Wright, T.S.

    1993-03-01

    This section summarizes trainee evaluations for the Safety Training Section course, ``Machine Guarding`` which was conducted September 1-3, 1992 in Richland, Washington. This was the fifth time the course has been taught. This report summarizes the quantitative course evaluations that trainees provided upon completion of the course. Sections 1.3 and 1.4 provide written comments and examination results. Also provided are instructors` suggestions for improvement. Ratings were generally high, especially for the section on Subpart 0 guarding, which was consistent with the trainees` comments. Most of the trainees wanted a more in-depth look at Machine Guarding regulations. Lockout/ragout information and more site tours were frequently requested. In addition, the trainees were not interested in the subsection on personal protective equipment and electrical regulations.

  15. Evaluation of Machine Guarding course taught in Richland, Washington, September 1--3, 1992

    SciTech Connect (OSTI)

    Wright, T.S.

    1993-03-01

    This section summarizes trainee evaluations for the Safety Training Section course, Machine Guarding'' which was conducted September 1-3, 1992 in Richland, Washington. This was the fifth time the course has been taught. This report summarizes the quantitative course evaluations that trainees provided upon completion of the course. Sections 1.3 and 1.4 provide written comments and examination results. Also provided are instructors' suggestions for improvement. Ratings were generally high, especially for the section on Subpart 0 guarding, which was consistent with the trainees' comments. Most of the trainees wanted a more in-depth look at Machine Guarding regulations. Lockout/ragout information and more site tours were frequently requested. In addition, the trainees were not interested in the subsection on personal protective equipment and electrical regulations.

  16. Columbia River monitoring: Summary of chemical monitoring along cross sections at Vernita Bridge and Richland

    SciTech Connect (OSTI)

    Dirkes, R.L.; Patton, G.W.; Tiller, B.L.

    1993-05-01

    This report presents the results of the chemical monitoring performed by the Surface Environmental Surveillance Project (SESP) along cross sections of the Columbia River established at Vernita Bridge and the Richland Pumphouse. Potential Hanford-origin chemical constituents of interest were selected based on their presence in ground water near the river, past surveillance efforts that have documented their entry into the river, and reviews of special study reports, CERCIA remedial investigation/feasibility study (RI/FS) documentation, RCRA facility investigation/corrective measure (FI/CW) study plans, and preliminary risk assessments. Results presented in this report include volatile organic compounds, metals, and anions. The data were generated as part of the routine Columbia River monitoring program currently conducted as part of the SESP.

  17. EA-1889: Disposal of Decommissioned, Defueled Naval Reactor Plants from USS Enterprise (CVN 65) at the Hanford Site, Richland, Washington

    Broader source: Energy.gov [DOE]

    This EA, prepared by the Department of the Navy, evaluates the environmental impacts of the disposal of decommissioned, defueled, naval reactor plants from the USS Enterprise at DOE’s Hanford Site, Richland, Washington. DOE participated as a cooperating agency in the preparation of this EA. The Department of the Navy issued its FONSI on August 23, 2012.

  18. Battelle Memorial Institute, Pacific Northwest Division Smart...

    Open Energy Info (EERE)

    Grid Demonstration Project which is based in Richland, Washington. Overview Spanning five states and affecting more than 60,000 consumers, demonstrate and validate new smart...

  19. ENVIRONMENTAL MANAGEMENT ADVISORY BOARD AGENDA Pacific Northwest...

    Energy Savers [EERE]

    Hanford Site Welcome Doug Shoop, Richland Operations Office Site Deputy Manager Kevin Smith, Office of River Protection Site Manager Susan Leckband, Hanford Advisory ...

  20. Advance Patent Waiver W(A)2006-028 | Department of Energy

    Energy Savers [EERE]

    6-028 Advance Patent Waiver W(A)2006-028 This document waives certain patent rights the Department of Energy (DOE) has to inventions conceived or first actually reduced to practice by COLONY PROJECT under agreement SUBC-B555909, as the DOE has determined that granting such a waiver best serves the interests of the United States and the general public. PDF icon Advance Patent Waiver W(A)2006-028 More Documents & Publications Advance Patent Waiver W(A)2005-048 2011_INCITE_Fact_Sheets.pdf

  1. Advance Patent Waiver W(A)2012-021 | Department of Energy

    Energy Savers [EERE]

    2-021 Advance Patent Waiver W(A)2012-021 This document waives certain patent rights the Department of Energy (DOE) has to inventions conceived or first actually reduced to practice by USEC, INC. under agreement DE-NE0000488, as the DOE has determined that granting such a waiver best serves the interests of the United States and the general public. PDF icon Advance Patent Waiver W(A)2012-021 More Documents & Publications WA_1993_042_UNITED_TECHNOLOGIES_CORPORATION_Waiver_of_the_Go.pdf

  2. DOE Zero Energy Ready Home Case Study: Clifton View Homes, Coupeville, WA,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Systems Home | Department of Energy Coupeville, WA, Systems Home DOE Zero Energy Ready Home Case Study: Clifton View Homes, Coupeville, WA, Systems Home Case study of a DOE Zero Energy Ready Home on Whidbey Island, WA, that scored HERS 45 without PV. This 2,908-square-foot custom/system home has a SIP roof and walls, R-20 rigid foam under slab, triple-pane windows, ground source heat pump for radiant floor heat, and a unique balanced ventilation system using separate exhaust fans to bring

  3. DOE Zero Energy Ready Home Case Study: Dwell Development, Seattle, WA,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Systems Home | Department of Energy Dwell Development, Seattle, WA, Systems Home DOE Zero Energy Ready Home Case Study: Dwell Development, Seattle, WA, Systems Home Case study of a DOE Zero Energy Ready Home in Seattle, WA, that scored HERS 34 without PV. This 2,000-square-foot system home has R-45 double-stud walls, an unvented flat roof with 2 inches of spray foam plus 18 inches blown cellulose, R-42 XPS under slab, triple-pane windows, and a ductless mini-split heat pump. PDF icon Dwell

  4. Fisher & Paykel Appliances: ENERGY STAR Referral (WA42T26GW1) | Department

    Energy Savers [EERE]

    of Energy Fisher & Paykel Appliances: ENERGY STAR Referral (WA42T26GW1) Fisher & Paykel Appliances: ENERGY STAR Referral (WA42T26GW1) June 12, 2013 DOE referred the matter of Fisher & Paykel Appliances residential clothes washer, model WA42T26GW1, to the U.S. Environmental Protection Agency, brand manager for the ENERGY STAR Program, for appropriate action after DOE testing showed that the model does not meet the ENERGY STAR specification. PDF icon Fisher & Paykel Appliances:

  5. Pacific Power- wattsmart Business

    Broader source: Energy.gov [DOE]

    Pacific Power's wattsmart Business Program includes incentives and technical assistance for lighting, HVAC and other equipment upgrades that increase energy efficiency and exceed code requirements...

  6. Advance Patent Waiver W(A)2010-006 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Advance Patent Waiver W(A)2010-006 This document waives certain patent rights the Department of Energy (DOE) has to inventions conceived or first actually reduced to practice by ...

  7. Best Practices Case Study: Devoted Builders, LLC, Mediterrtanean Villas, Pasco,WA

    SciTech Connect (OSTI)

    2010-12-01

    Devoted Builders of Kennewick, WA worked with Building America's BIRA team to achieve the 50% Federal tax credit level energy savings on 81 homes at its Mediterranean Villas community in eastern Washington.

  8. DOE Zero Energy Ready Home Case Study: TC Legend Homes, Bellingham, WA

    Broader source: Energy.gov [DOE]

    Case study of a DOE Zero Energy Ready home in Bellingham, WA, that achieves HERS 43 without PV or HERS 13 with 3.2 kW of PV.

  9. Advance Patent Waiver W(A)2008-006 | Department of Energy

    Energy Savers [EERE]

    8-006 Advance Patent Waiver W(A)2008-006 This document waives certain patent rights the Department of Energy (DOE) has to inventions conceived or first actually reduced to practice by CATERPILLAR, INC under agreement DE-FC26-00AL67017, as the DOE has determined that granting such a waiver best serves the interests of the United States and the general public. PDF icon Advance Patent Waiver W(A)2008-006 More Documents & Publications

  10. Advance Patent Waiver W(A)2010-037 | Department of Energy

    Energy Savers [EERE]

    7 Advance Patent Waiver W(A)2010-037 This document waives certain patent rights the Department of Energy (DOE) has to inventions conceived or first actually reduced to practice by ALCATEL-LUCENT USA INC. under agreement DE-EE0002895, as the DOE has determined that granting such a waiver best serves the interests of the United States and the general public. PDF icon Advance Patent Waiver W(A)2010-037 More Documents & Publications A

  11. Advance Patent Waiver W(A)2010-038 | Department of Energy

    Energy Savers [EERE]

    8 Advance Patent Waiver W(A)2010-038 This document waives certain patent rights the Department of Energy (DOE) has to inventions conceived or first actually reduced to practice by ALCATEL-LUCENT USA INC. under agreement DE-EE0002887, as the DOE has determined that granting such a waiver best serves the interests of the United States and the general public. PDF icon Advance Patent Waiver W(A)2010-038 More Documents & Publications A

  12. Transactional Network | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transactional Network Transactional Network Lead Performer: Pacific Northwest National Laboratory - Richland, WA Project Partners: -- Lawrence Berkeley National Laboratory - Berkeley, CA -- Oak Ridge National Laboratory - Oak Ridge, TN -- Transformative Wave - Kent, WA -- Emerson - St. Louis, MO -- NorthWrite - Minneapolis, MN -- EnerNOC - Baltimore, MD DOE Funding: $625,000 Cost Share: N/A Project website: http://transactionalnetwork.pnnl.gov/ Project Term: Jan. 2013 - 2016 Project Objective

  13. SASW Measurements at Hanford

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    H - Spectral Analysis of Surface Waves Hanford Site-Wide Probabilistic Seismic Hazard Analysis (PSHA): Seismic Shear Wave Velocity Profiling at Hanford, WA SASW Testing and Analysis Procedures, V s Profiles, Sensitivity Studies and Responses to Technical Integration Team Questions for Pacific Northwest National Laboratory Richland, WA by Kenneth H. Stokoe, II Yin-Cheng Lin Sungmoon Hwang, and Julia Roberts May 7, 2014 Geotechnical Engineering Report GR14-1 Geotechnical Engineering Center Civil

  14. Pacific Northwest National Laboratory Facility Radionuclide Emission Points and Sampling Systems

    SciTech Connect (OSTI)

    Barfuss, Brad C.; Barnett, J. M.; Ballinger, Marcel Y.

    2009-04-08

    BattellePacific Northwest Division operates numerous research and development laboratories in Richland, Washington, including those associated with the Pacific Northwest National Laboratory (PNNL) on the Department of Energys Hanford Site that have the potential for radionuclide air emissions. The National Emission Standard for Hazardous Air Pollutants (NESHAP 40 CFR 61, Subparts H and I) requires an assessment of all effluent release points that have the potential for radionuclide emissions. Potential emissions are assessed annually. Sampling, monitoring, and other regulatory compliance requirements are designated based upon the potential-to-emit dose criteria found in the regulations. The purpose of this document is to describe the facility radionuclide air emission sampling program and provide current and historical facility emission point system performance, operation, and design information. A description of the buildings, exhaust points, control technologies, and sample extraction details is provided for each registered or deregistered facility emission point. Additionally, applicable stack sampler configuration drawings, figures, and photographs are provided.

  15. Pacific Northwest Laboratory facilities radionuclide inventory assessment CY 1992-1993

    SciTech Connect (OSTI)

    Sula, M.J.; Jette, S.J.

    1994-09-01

    Assessments for evaluating compliance with airborne radionuclide emission monitoring requirements in the National Emission Standards for Hazardous Air Pollutants (NESHAPs - U.S. Code of Federal Regulations, Title 40 Part 61, Subparts H and I) were performed for 33 buildings at the U.S. Department of Energy`s (DOE) Pacific Northwest Laboratory on the Hanford Site, and for five buildings owned and operated by Battelle, Pacific Northwest Laboratories in Richland, Washington. The assessments were performed using building radionuclide inventory data obtained in 1992 and 1993. Results of the assessments are summarized in Table S.1 for DOE-PNL buildings and in Table S.2 for Battelle-owned buildings. Based on the radionuclide inventory assessments, four DOE-PNL buildings (one with two emission points) require continuous sampling for radionuclides per 40 CFR 61. None of the Battelle-owned buildings require continuous emission sampling.

  16. Pacific Northwest National Laboratory Operated

    Office of Legacy Management (LM)

    ... To satisfy the requirements of the Biomonitoring Plan of the ... to rapid redox reactions within the natural enviromnent. ... then were shipped to Rich land, WA. There was not enough ...

  17. U.S. Department of Energy, Richland Operations Office And CH2M HILL Plateau Remediation Company Partnering Charter For Partnering Performance Agreement

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) Richland Operations Office (DOE-RL) and CH2M HILL Plateau Remediation Company (CHPRC) are committed to continuous improvement and will utilize principles of the...

  18. PACIFIC NORTHWEST CYBER SUMMIT

    SciTech Connect (OSTI)

    Lesperance, Ann M.; Matlock, Gordon W.; Becker-Dippmann, Angela S.; Smith, Karen S.

    2013-08-07

    On March 26, 2013, the Snohomish County Public Utility District (PUD) and the U.S. Department of Energy’s (DOE’s) Pacific Northwest National Laboratory (PNNL) jointly hosted the Pacific Northwest Cyber Summit with the DOE’s Office of Electricity Delivery and Energy Reliability, the White House, Washington State congressional delegation, Washington State National Guard, and regional energy companies.

  19. Pacific Wind | Open Energy Information

    Open Energy Info (EERE)

    Wind Jump to: navigation, search Name Pacific Wind Facility Pacific Wind Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner enXco Developer...

  20. Pacific Ethanol, Inc | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Major DOE Biofuels Project Locations Pacific Ethanol, Inc Pacific Ethanol, Inc

  1. High Impact Technology Catalyst | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Catalyst High Impact Technology Catalyst High Impact Technology Catalyst Lead Performers: -- Argonne National Laboratory (ANL) - Lemont, IL -- Lawrence Berkeley National Laboratory (LBNL) - Berkeley, CA -- National Renewable Energy Laboratory (NREL) - Golden, CO -- Oak Ridge National Laboratory (ORNL) - Oak Ridge, TN -- Pacific Northwest National Laboratory (PNNL) - Richland, WA Project Term: Ongoing Program Funding Type: Direct Lab Funding Program Webpage: High Impact Technology Catalyst

  2. Jobs | U.S. DOE Office of Science (SC)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    About » Jobs Pacific Northwest Site Office (PNSO) PNSO Home About Organization Chart .pdf file (275KB) Jobs Projects Contract Management NEPA Documents Resources Contact Information Pacific Northwest Site Office U.S. Department of Energy P.O. Box 350, MS K9-42 Richland, WA 99352 P: (509) 372-4005 About Jobs Print Text Size: A A A Subscribe FeedbackShare Page Current Open Federal Positions The Pacific Northwest Site Office is located in Richland, Washington. All open federal positions listed

  3. Environmental restoration and waste management site-specific plan for Richland Operations Office. [Contains glossary

    SciTech Connect (OSTI)

    Not Available

    1991-09-01

    This document was prepared to implement and support the US Department of Energy-Headquarters (DOE-HQ) national plan. The national plan, entitled Environmental Restoration and Waste Management Five-Year Plan (DOE 1990b) (hereinafter referred to as the DOE-HQ Five-Year Plan) is the cornerstone of the US Department of Energy's (DOE) long-term strategy in environmental restoration and waste management. The DOE-HQ Five-Year Plan addresses overall philosophy and environmental and waste-related activities under the responsibilities of the DOE Office of Environmental Restoration and Waste Management. The plan also reaffirms DOE-HQ goals to bring its nuclear sites into environmental compliance in cooperation with its regulators and the public, and to clean up and restore the environment by 2019 (the commitment for the Hanford Site is for one year sooner, or 2018). This document is part of the site-specific plan for the US Department of Energy-Richland Operations Office (DOE-RL). It is the first revision of the original plan, which was dated December 1989 (DOE-RL 1989a). This document is a companion document to the Overview of the Hanford Cleanup Five-Year Plan (DOE-RL 1989d) and The Hanford Site Environmental Restoration and Waste Management Five-Year Plan Activity Data Sheets (DOE-RL 1991). Although there are three documents that make up the complete DOE-RL plan, this detailed information volume was prepared so it could be used as a standalone document. 71 refs., 40 figs., 28 tabs.

  4. 2011 Annual Ecological Survey: Pacific Northwest National Laboratory Site

    SciTech Connect (OSTI)

    Becker, James M.; Chamness, Michele A.

    2012-02-27

    The U.S. Department of Energy (DOE) Pacific Northwest Site Office (PNSO) oversees and manages the DOE contract for the Pacific Northwest National Laboratory (PNNL), a DOE Office of Science multi-program laboratory located in Richland, Washington. PNSO is responsible for ensuring that all activities conducted on the PNNL site comply with applicable laws, policies, and DOE Orders. The DOE Pacific Northwest Site Office Cultural and Biological Resources Management Plan (DOE/PNSO 2008) addresses the requirement for annual surveys and monitoring for species of concern and to identify and map invasive species. In addition to the requirement for an annual survey, proposed project activities must be reviewed to assess any potential environmental consequences of conducting the project. The assessment process requires a thorough understanding of the resources present, the potential impacts of a proposed action to those resources, and the ultimate consequences of those actions. The PNNL site is situated on the southeastern corner of the DOE Hanford Site, located at the north end of the city of Richland in south-central Washington. The site is bordered on the east by the Columbia River, on the west by Stevens Drive, and on the north by the Hanford Site 300 Area (Figure 1). The environmental setting of the PNNL site is described in Larson and Downs (2009). There are currently two facilities on the PNNL site: the William R. Wiley Environmental Molecular Sciences Laboratory and the Physical Sciences Facility. This report describes the annual survey of biological resources found on the undeveloped upland portions of the PNNL site. The annual survey is comprised of a series of individual field surveys conducted on various days in late May and throughout June 2011. A brief description of the methods PNNL ecologists used to conduct the baseline surveys and a summary of the results of the surveys are presented. Appendix A provides a list of plant and animal species identified in the upland areas of the PNNL site in 2011. Efforts in 2011 to control noxious weed populations (comprising plant species designated as Class B noxious weeds by the Washington State Noxious Weed Control Board) discovered in 2009 and initially treated with herbicides in 2010 are described in Appendix B.

  5. Tropical Western Pacific

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ARM-00-005 RPT(TWP)-010.006 LA-UR-004434 Tropical Western Pacific Site Science Mission Plan July - December 2000 Prepared for the U.S. Department of Energy under Contract W-7405-ENG-36 Tropical Western Pacific Project Office Atmospheric and Climate Sciences Group (EES-8) Earth and Environmental Sciences Division Los Alamos National Laboratory Los Alamos, NM 87545 This report and previous versions are available electronically at the following web sites:

  6. Environmental consequences of postulated plutonium releases from Exxon Nuclear MOFP, Richland, Washington, as a result of severe natural phenomena

    SciTech Connect (OSTI)

    Jamison, J.D.; Watson, E.C.

    1980-02-01

    Potential environmental consequences in terms of radiation dose to people are presented for postulated plutonium releases caused by severe natural phenomena at the Exxon Nuclear Company Mixed Oxide Fabrication Plant (MOFP), Richland, Washington. The severe natural phenomena considered are earthquakes, tornadoes, high straight-line winds, and floods. Maximum plutonium deposition values are given for significant locations around the site. All important potential exposure pathways are examined. The most likely 50-year committed dose equivalents are given for the maximum-exposed individual and the population within a 50-mile radius of the plant. The maximum plutonium deposition values most likely to occur offsite are also given.

  7. Final Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington--Frequent Asked Questions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Final Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington (Final TC & WM EIS) (DOE/EIS-0391) Frequently Asked Questions What are the U.S. Department of Energy (DOE) proposed actions in the Final TC & WM EIS? The Final TC & WM EIS (DOE/EIS-0391) evaluates three sets of proposed actions, as follows: Retrieve and treat the waste remaining in 177 underground storage tanks; store the high-level radioactive waste (HLW); dispose of

  8. Search for: All records | SciTech Connect

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Office, Richland, WA (United States) Richland Support Office (United States) Rocky Flats Environmental Technology Site (RFP), Golden, CO (United States) Rocky Flats...

  9. Search for: All records | SciTech Connect

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations Office, Richland, WA (United States) Richland Support Office (United States) Rocky Flats Environmental Technology Site (RFP), Golden, CO (United States) Rocky Flats...

  10. 14655 Section A

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of Energy Richland Operations Office Same as Block 7 Procurement Services Division ATTN: Michael K. Barrett, Contracting Officer P. O. Box 550 Richland, WA 99352 NOTE: In sealed...

  11. Sumas, WA Liquefied Natural Gas Imports from Canada (Million Cubic Feet)

    U.S. Energy Information Administration (EIA) Indexed Site

    from Canada (Million Cubic Feet) Sumas, WA Liquefied Natural Gas Imports from Canada (Million Cubic Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2014 5 2015 4 4 2 1 2016 1 2 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 4/29/2016 Next Release Date: 5/31/2016 Referring Pages: U.S. Liquefied Natural Gas Imports by Point of Entry Sumas, WA Natural Gas Imports by Pipeline from Canada

  12. W.A. Parish Post-Combustion CO{sub 2} Capture and Sequestration Project

    Office of Scientific and Technical Information (OSTI)

    Phase 1 Definition (Technical Report) | SciTech Connect SciTech Connect Search Results Technical Report: W.A. Parish Post-Combustion CO{sub 2} Capture and Sequestration Project Phase 1 Definition Citation Details In-Document Search Title: W.A. Parish Post-Combustion CO{sub 2} Capture and Sequestration Project Phase 1 Definition For a secure and sustainable energy future, the United States (U.S.) must reduce its dependence on imported oil and reduce its emissions of carbon dioxide (CO{sub 2})

  13. Tropical Western Pacific

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    govSitesTropical Western Pacific TWP Related Links Facilities and Instruments Manus Island Nauru Island Darwin, AUS ES&H Guidance Statement Operations Science Field Campaigns Year of Tropical Convection Visiting the Site TWP Fact Sheet Images Information for Guest Scientists Contacts Tropical Western Pacific-Inactive Manus, Papua New Guinea: 2° 3' 39.64" S, 147° 25' 31.43" E Nauru Island: 0° 31' 15.6" S, 166° 54' 57.60" E Darwin, Australia: 12° 25' 28.56" S,

  14. National Environmental Policy Act (NEPA) Documents | U.S. DOE Office of

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Science (SC) National Environmental Policy Act (NEPA) Documents Pacific Northwest Site Office (PNSO) PNSO Home About Projects Contract Management NEPA Documents Categorical Exclusion Determinations Environmental Assessments and Environmental Impact Statements Resources Contact Information Pacific Northwest Site Office U.S. Department of Energy P.O. Box 350, MS K9-42 Richland, WA 99352 P: (509) 372-4005 National Environmental Policy Act (NEPA) Documents Print Text Size: A A A FeedbackShare

  15. Categorical Exclusion (CX) Determinations | U.S. DOE Office of Science (SC)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Categorical Exclusion (CX) Determinations Pacific Northwest Site Office (PNSO) PNSO Home About Projects Contract Management NEPA Documents Categorical Exclusion Determinations Environmental Assessments and Environmental Impact Statements Resources Contact Information Pacific Northwest Site Office U.S. Department of Energy P.O. Box 350, MS K9-42 Richland, WA 99352 P: (509) 372-4005 National Environmental Policy Act (NEPA) Documents Categorical Exclusion (CX) Determinations Print Text Size: A A A

  16. Sensors and Controls Projects | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sensors and Controls » Sensors and Controls Projects Sensors and Controls Projects See past projects. Advanced Building Control Solutions Lead Performer: Pacific Northwest National Laboratory (PNNL) - Richland, WA Partners: -- Oak Ridge National Laboratory (ORNL) - Oak Ridge, TN -- Lawrence Berkeley National Laboratory (LBNL) - Berkeley, CA Advanced Open-Source Sensor Packages for Building Monitoring Lead Performer: Oak Ridge National Laboratory (ORNL) - Oak Ridge, TN Partners: -- Pacific

  17. Independent Oversight Activity Report, Pacific Northwest National...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pacific Northwest National Laboratory - January 2014 Independent Oversight Activity Report, Pacific Northwest National Laboratory - January 2014 February 2014 PNNL Corrective...

  18. DOE Zero Energy Ready Home Case Study: Clifton View Homes, Whidbey Island, WA

    Broader source: Energy.gov [DOE]

    Case study of a DOE Zero Energy Ready home on Whidbey Island, WA, that scores HERS 37 without PV or HERS -13 with 10 kW PV, enough to power the home and an electric car. The two-story custom home...

  19. Pacific Biodiesel: Renewable and Sustainable

    Broader source: Energy.gov [DOE]

    Presentation covers the Pacific Biodiesel topic and is given at the Spring 2011 Federal Utility Partnership Working Group (FUPWG) meeting.

  20. Reduced shedding regenerator and method (Patent) | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    using the regenerator. Authors: Qiu, Songgang 1 ; Augenblick, John E. 1 ; Erbeznik, Raymond M. 2 + Show Author Affiliations (Richland, WA) (Kennewick, WA) Publication Date:...

  1. EIS-0063: Waste Management Operations, Double-Shell Tanks for Defense High-Level Radioactive Waste Storage, Hanford Site, Richland, Washington

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy developed this statement to evaluate the existing tank design and consider additional specific design and safety feature alternatives for the thirteen tanks being constructed for storage of defense high-level radioactive liquid waste at the Hanford Site in Richland, Washington. This statement supplements ERDA-1538, "Final Environmental Statement on Waste Management Operation."

  2. EIS-0356: Notice of Intent to Prepare an Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Retrieval, Treatment, and Disposal of Tank Waste and Closure of Single-Shell Tanks at the Hanford Site, Richland, WA

  3. DOE Zero Energy Ready Home Case Study: TC Legend, Seattle, WA, Custom Home

    Broader source: Energy.gov [DOE]

    Case study of a DOE Zero Energy Ready Home in Seattle, WA, that scored HERS 37 without PV, HERS -1 with PV. This 1,915-square-foot custom home has SIP walls and roof, R-20 XPS under the slab, triple-pane windows, an air to water heat pump for radiant heat, and balanced ventilation with timer-controlled fans to bring in and exhaust air.

  4. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 ROCKVILLE MD 208506247 053506312 COMPUTER SCIENCES CORPORATION Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland...

  5. Pacific Power- Residential wattsmart Program

    Broader source: Energy.gov [DOE]

    Pacific Power offers incentives for residential customers to improve the energy efficiency of homes through the Home Energy Savings Program. Full details are available on the program website.

  6. Tropical Western Pacific CART Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tropical Western Pacific CART Site This month we will visit an ARM CART site with a pleasant climate: the Tropical Western Pacific (TWP) CART site, along the equator in the western Pacific Ocean. The TWP locale lies between 10 degrees North latitude and 10 degrees South latitude and extends from Indonesia east- ward beyond the international date line (Figure 1). This area was selected because it is in and around the Pacific warm pool, the area of warm sea- surface temperatures that determine El

  7. Pacific Ethanol | Open Energy Information

    Open Energy Info (EERE)

    Pacific Ethanol Address: 400 Capitol Mall, Suite 2060 Place: Sacramento, California Zip: 95814 Region: Bay Area Sector: Biofuels Product: Ethanol production Website:...

  8. ARM - Kiosks - Tropical Wester Pacific

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Barrow, Alaska Tropical Western Pacific Site Tours Contacts Students Study Hall About ARM Global Warming FAQ Just for Fun Meet our Friends Cool Sites Teachers Teachers' Toolbox ...

  9. Pacific Power- wattsmart Business Program

    Broader source: Energy.gov [DOE]

    Pacific Power provides incentives for its commercial and industrial customers in Washington to retrofit existing facilities with more efficient equipment. Full details are available on the program...

  10. Pacific Northwest National Laboratory

    Broader source: Energy.gov [DOE]

    The Newberry Geothermal Energy team seeks to establish the FORGE site at Newberry Volcano. The region surrounding the proposed site, along with its geothermal and EGS potential, was previously explored and researched by participating members of the Newberry Geothermal Energy team, and the understanding and data gathered with those efforts provide the scientific foundation for establishing a potential FORGE site. The team brings together the scientific research and management experience of the Pacific Northwest National Laboratory with the research, educational, and outreach experience of Oregon State University, and the industry and EGS experience of AltaRock Energy, Inc.

  11. Pacific Northwest Government Contracting Conference

    Broader source: Energy.gov [DOE]

    The Government Contract Assistance Program (GCAP) and Pacific Northwest Defense Coalition (PNDC) cordially invite you to attend our annual Pacific Northwest Government Contracting Conference. The 2015 conference offers a full day of robust and informative training, coupled with networking opportunities. Attendees will learn from seasoned professionals and receive training specifically tailored to companies pursuing the government marketplace.

  12. Sierra Pacific Industries Inc | Open Energy Information

    Open Energy Info (EERE)

    Industries Inc Place: California Website: www.spi-ind.com Twitter: @SierraPacificIn Facebook: https:www.facebook.compagesSierra-Pacific-Industries295910403780823 References:...

  13. Clean Pacific Ventures | Open Energy Information

    Open Energy Info (EERE)

    Ventures Jump to: navigation, search Logo: Clean Pacific Ventures Name: Clean Pacific Ventures Address: 425 California Street, Suite 2450 Place: San Francisco, California Zip:...

  14. Pacific Ethanol, Inc | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pacific Ethanol, Inc Pacific Ethanol, Inc Design and build a demonstration cellulosic ethanol plant in Boardman. PDF icon pacificethanolfactsheet040308.pdf More Documents & ...

  15. Dutch Pacific Wind Farm | Open Energy Information

    Open Energy Info (EERE)

    Dutch Pacific- LLC Developer Dutch Pacific- LLC Energy Purchaser Southern California Edison Co Location San Gorgonio CA Coordinates 33.9095, -116.734 Show Map Loading map......

  16. Powerworks Inc Pacific Winds | Open Energy Information

    Open Energy Info (EERE)

    Pacific Winds Place: Tracy, California Zip: CA 95377 Sector: Renewable Energy, Solar, Wind energy Product: PowerWorks Inc. and its affiliate, Pacific Winds Inc., are...

  17. Independent Oversight Review, Pacific Northwest National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pacific Northwest National Laboratory - September 2013 September 2013 Review of the Fire Protection Program at Pacific Northwest National Laboratory and the Fire Suppression...

  18. Pacific West Energy | Open Energy Information

    Open Energy Info (EERE)

    Energy Jump to: navigation, search Name: Pacific West Energy Place: Vancouver, Washington State Zip: 98661 Sector: Renewable Energy Product: Pacific West Energy is a renewable...

  19. Safety assessment for proposed pump mixing operations to mitigate episodic gas releases in tank 241-101-SY: Hanford Site, Richland, Washington

    SciTech Connect (OSTI)

    Lentsch, J.W., Westinghouse Hanford

    1996-05-16

    This safety assessment addresses each of the elements required for the proposed action to remove a slurry distributor and to install, operate, and remove a mixing pump in Tank 241-SY-101, which is located within the Hanford Site, Richland, Washington. The proposed action is required as part of an ongoing evaluation of various mitigation concepts developed to eliminate episodic gas releases that result in hydrogen concentrations in the tank dome space that exceed the lower flammability limit.

  20. Evaluation of P-101 course ``Orientation to Occupational Safety Compliance in DOE`` taught in Richland, Washington, June 16--June 26, 1992

    SciTech Connect (OSTI)

    Colley, D.L.

    1993-03-01

    This report summarizes trainee evaluations for the Safety Training Section course, ``Orientation to Occupational Safety in DOE``, (P-101) which was conducted June 16 to 26, 1992 at Hanford, in Richland, Washington. Sections 1.1 and 1.2 of this report summarize the quantitative course evaluations that trainees provided upon completion of the course. Appendix A provides a transcript of the trainees` written comments.

  1. Evaluation of P-101 course Orientation to Occupational Safety Compliance in DOE'' taught in Richland, Washington, June 16--June 26, 1992

    SciTech Connect (OSTI)

    Colley, D.L.

    1993-03-01

    This report summarizes trainee evaluations for the Safety Training Section course, Orientation to Occupational Safety in DOE'', (P-101) which was conducted June 16 to 26, 1992 at Hanford, in Richland, Washington. Sections 1.1 and 1.2 of this report summarize the quantitative course evaluations that trainees provided upon completion of the course. Appendix A provides a transcript of the trainees' written comments.

  2. A safety assessment for proposed pump mixing operations to mitigate episodic gas releases in tank 241-SY-101: Hanford Site,Richland, Washington

    SciTech Connect (OSTI)

    Lentsch, J.W.

    1996-07-01

    This safety assessment addresses each of the elements required for the proposed action to remove a slurry distributor and to install, operate, and remove a mixing pump in Tank 241-SY-101,which is located within the Hanford Site, Richland, Washington.The proposed action is required as part of an ongoing evaluation of various mitigation concepts developed to eliminate episodic gas releases that result in hydrogen concentrations in the tank dome space that exceed the lower flammability limit.

  3. Environmental assessment for the resiting, construction, and operation of the Environmental and Molecular Sciences Laboratory at the Hanford Site, Richland, Washington

    SciTech Connect (OSTI)

    Not Available

    1994-07-01

    This environmental assessment (EA) presents estimated environmental impacts from the resiting, construction, and operation of the US Department of Energy`s (DOE`s) Environmental and Molecular Sciences Laboratory (EMSL), which is proposed to be constructed and operated on land near the south boundary of the Hanford Site near Richland, Washington. The EMSL, if constructed, would be a modern research facility in which experimental, theoretical, and computational techniques can be focused on environmental restoration problems, such as the chemical and transport behavior of complex mixtures of contaminants in the environment. The EMSL design includes approximately 18,500 square meters (200,000 square feet) of floor space on a 12-hectare (30-acre) site. The proposed new site is located within the city limits of Richland in north Richland, at the south end of DOE`s 300 Area, on land to be deeded to the US by the Battelle Memorial Institute. Approximately 200 persons are expected to be employed in the EMSL and approximately 60 visiting scientists may be working in the EMSL at any given time. State-of-the-art equipment is expected to be installed and used in the EMSL. Small amounts of hazardous substances (chemicals and radionuclides) are expected to be used in experimental work in the EMSL.

  4. Pacific Northwest National Laboratory National Environmental Policy Act Compliance Program -- FY 2010 Annual Report

    SciTech Connect (OSTI)

    Weeks, Regan S.

    2011-04-20

    During fiscal year (FY) 2010, Pacific Northwest National Laboratory (PNNL) Environmental Protection and Regulatory Programs Division (before March 1, 2011 known as the Environmental Management Services Department) staff performed a number of activities as part of PNNLs National Environmental Policy Act (NEPA) compliance program. These activities helped to verify U.S. Department of Energy (DOE) Pacific Northwest Site Office (PNSO) and Richland Operations Office (RL) compliance with NEPA requirements and streamline the NEPA process for federal activities conducted at PNNL. Self-assessments were performed to address NEPA compliance and cultural and biological resource protection. The NEPA self-assessments focused on implementation within the PNNL Energy and Environment Directorate and routine maintenance activities conducted during the previous calendar year. The cultural and biological resource self-assessments were conducted in accordance with the PNSO Cultural and Biological Resources Management Plan, which specifies annual monitoring of important resources to assess and document the status of the resources and the associated protective mechanisms in place to protect sensitive resources.

  5. Pacific Ethanol, Inc | Department of Energy

    Office of Environmental Management (EM)

    Verenium Biofuels Fact Sheet Pacific Ethanol, Inc Verenium Pilot- and Demonstration-Scale Biorefinery

  6. Richland Operations (DOE-RL) Environmental Safety Health (ES and H) FY 2000 and FY 2001 Execution Commitment Summary

    SciTech Connect (OSTI)

    REEP, I.E.

    2000-12-01

    All sites in the U.S. Department of Energy (DOE) Complex prepare this report annually for the DOE Office of Environment, Safety and Health (EH). The purpose of this report is to provide a summary of the previous and current year's Environment, Safety and Health (ES&H) execution commitments and the Safety and Health (S&H) resources that support these activities. The fiscal year (FY) 2000 and 2001 information and data contained in the Richland Operations Environment, Safefy and Health Fiscal Year 2002 Budget-Risk Management Summary (RL 2000a) were the basis for preparing this report. Fiscal year 2001 activities are based on the President's Amended Congressional Budget Request of $689.6 million for funding Ofice of Environmental Management (EM) $44.0 million for Fast Flux Test Facility standby less $7.0 million in anticipated DOE, Headquarters holdbacks for Office of Nuclear Energy, Science and Technology (NE); and $55.3 million for Safeguards and Security (SAS). Any funding changes as a result of the Congressional appropriation process will be reflected in the Fiscal Year 2003 ES&H Budget-Risk Management Summary to be issued in May 2001. This report provides the end-of-year status of FY 2000 ES&H execution commitments, including actual S&H expenditures, and describes planned FY 2001 ES&H execution commitments and the S&H resources needed to support those activities. This requirement is included in the ES&H guidance contained in the FY 2002 Field Budget Call (DOE 2000).

  7. Radiological dose assessment for the decontaminated concrete removed from 183-H solar evaporation basins at the Hanford site, Richland, Washington

    SciTech Connect (OSTI)

    Kamboj, S.; Faillace, E.; Yu, C.

    1997-01-01

    Potential maximum radiation dose rates over a 1,000-year time horizon were calculated for exposure to the decontaminated concrete removed from the 183-H Solar Evaporation Basins at the Hanford Site, Richland, Washington. The RESRAD computer code, Version 5.62, which implements the methodology described in the US Department of Energy`s manual for developing residual radioactive material guidelines, was used in this evaluation. Currently, the concrete is not being used. Four potential exposure scenarios were developed for the land area where the decontaminated concrete will be stored. In Scenario A industrial use of the land is assumed; in Scenario B recreational use of the land is assumed; in Scenario C residential use of the land is assumed; and in Scenario D (a plausible but unlikely land-use scenario), the presence of a subsistence farmer in the immediate vicinity of the land is assumed. For Scenarios A and B, water used for drinking is assumed to be surface water from the Columbia River; for Scenarios C and D, groundwater drawn from a well located at the downgradient edge of the storage area is the only source of water for drinking, irrigation, and raising livestock. Conservative parameters values were used to estimate the radiation doses. The results of the evaluation indicate that the US Department of Energy`s dose limit of 100 mrem/yr would not be exceeded for any of the scenarios analyzed. The potential maximum dose rates for Scenarios A, B, C, and D are 0.75, 0.022, 29, 29 mrem/yr, respectively. An uncertainty analysis was performed to determine which parameters have the greatest impact on the estimated doses. The doses in Scenarios C and D were found to be very sensitive to the magnitude of the irrigation rate.

  8. Power Services Account Executives (AE's)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    541-318-1680 debloyer@bpa.gov Larry Felton Richland, WA 509-392-2069 lxfelton@bpa.gov Hope Ross Mead, WA 509-822-4590 heross@bpa.gov Nancy Schimmels Mead, WA 509-822-4591...

  9. Microsoft Word - Cyber-Wireless-CIP_Draft_ 5 1_2-25-09_clean.doc

    Energy Savers [EERE]

    Wireless System Considerations When Implementing NERC Critical Infrastructure Protection Standards Teja Kuruganti 1 , Walter Dykas 1 , Wayne Manges 1 , Tom Flowers 2 , Mark Hadley 3 , Paul Ewing 1 , Thomas King 1 1 Oak Ridge National Laboratory, Oak Ridge, TN 37831 2 Flowers Control Center Solutions, Todd Mission, TX 77363 3 Pacific Northwest National Laboratory, Richland, WA 99352 February 25, 2009 Introduction Energy asset owners are facing a monumental challenge as they address compliance

  10. Virtual Sensing | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Virtual Sensing Virtual Sensing Lead Performer: Lawrence Berkeley National Laboratory (LBNL) - Berkeley, CA Partners: -- Pacific Northwest National Laboratory (PNNL) - Richland, WA -- Oak Ridge National Laboratory (ORNL) - Oak Ridge, TN FY16 DOE Funding: $225,000 Project Term: Current - September 30, 2016 Funding Type: Direct Lab Funding PROJECT OBJECTIVE Virtual or inferential sensing can provide a lower-cost and less-invasive approach to monitor building performance and operation compared to

  11. Enhanced Cloud-based Control System for Small Commercial Buildings |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Enhanced Cloud-based Control System for Small Commercial Buildings Enhanced Cloud-based Control System for Small Commercial Buildings Lead Performer: Pacific Northwest National Laboratory - Richland, WA Partner: NorthWrite Inc. - Portland, OR DOE Total Funding: $300,000 Project Term: June 1, 2016 - November 30, 2017 Funding Type: Small Business Vouchers Pilot PROJECT OBJECTIVE NorthWrite Inc. delivers services to owners of small commercial buildings, using a cloud-based

  12. Open Energy Information Systems (OpenEIS) - 2014 Peer Review | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy (OpenEIS) - 2014 Peer Review Open Energy Information Systems (OpenEIS) - 2014 Peer Review Lead Performer: Lawrence Berkeley National Laboratory - Berkeley, CA Project Partners: -- Pacific Northwest National Laboratory - Richland, WA -- Navigant - Chicago, IL DOE Funding: $1,550,000 Cost Share: N/A Project Term: Oct. 2012 - Sept. 2017 Project Objective Building managers can increase whole-building energy efficiency by up to 20% through continuous monitoring and analysis. However,

  13. Sept 16 (all times EDT

    Energy Savers [EERE]

    Sensors and Controls R&D » Sensors and Controls Projects Sensors and Controls Projects See past projects. Advanced Building Control Solutions Lead Performer: Pacific Northwest National Laboratory (PNNL) - Richland, WA Partners: -- Oak Ridge National Laboratory (ORNL) - Oak Ridge, TN -- Lawrence Berkeley National Laboratory (LBNL) - Berkeley, CA Advanced Open-Source Sensor Packages for Building Monitoring Lead Performer: Oak Ridge National Laboratory (ORNL) - Oak Ridge, TN Partners: --

  14. Smart Cities - Smart Growth

    Energy Savers [EERE]

    Buildings Equipment Initiative Smart Buildings Equipment Initiative Lead Performers: -- Pacific Northwest National Laboratory - Richland, WA -- National Renewable Energy Laboratory - Golden, CO DOE Funding: $2,100,000 Cost Share: N/A Project Term: Oct. 2014 - Sept. 2015 PROJECT OBJECTIVE The purpose of this project is to develop data taxonomies and standard communication protocols that enable building equipment to engage the larger electric system and to develop analytic methods and testing

  15. Light-harvesting materials: Soft support for energy conversion

    SciTech Connect (OSTI)

    Stolley, Ryan M.; Helm, Monte L.

    2014-11-10

    To convert solar energy into viable fuel sources, coupling light-harvesting materials to catalysts is a critical challenge. Now, coupling between an organic supramolecular hydrogel and a non precious metal catalyst has been demonstrated to be effective for photocatalytic H2 production. Ryan M. Stolley and Monte L. Helm are at Pacific Northwest National Laboratory (PNNL), Richland, WA, USA 99352. PNNL is operated by Battelle for the US Department of Energy. e-mail: Monte.Helm@pnnl.gov

  16. Focus on Advancing High Performance Mass Spectrometry, Honoring Dr. Richard D. Smith, Recipient of the 2013 Award for a Distinguished Contribution in Mass Spectrometry

    SciTech Connect (OSTI)

    Baker, Erin Shammel; Muddiman, David C.; Loo, Joseph

    2014-12-01

    This special focus issue of the Journal of the American Society for Mass Spectrometry celebrates the accomplishments of Dr. Richard D. Smith, the recipient of the 2013ASMS Award for a Distinguished Contribution in Mass Spectrometry, and who serves as a Battelle Fellow, Chief Scientist in the Biological Sciences Division, and Director of Proteomics Research at Pacific Northwest National Laboratory (PNNL) in Richland, WA. The award is for his development of the electrodynamic ion funnel.

  17. OpenStudio | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Commercial Buildings » Analysis Tools » OpenStudio OpenStudio Lead Performers: -- National Renewable Energy Lab (NREL) - Golden, CO -- Argonne National Lab (ANL) - Argonne, IL -- Lawrence Berkeley National Lab (LBNL) - Berkeley, CA -- Oak Ridge National Lab (ORNL) - Oak Ridge, TN -- Pacific Northwest National Lab (PNNL) - Richland, WA -- GARD Analytics - Oak Park, IL -- Empty Crate Software - Denver, CO Partners: -- Energy Trust of Oregon - Portland, OR -- Austin Energy - Austin, TX -- CPS

  18. Smart Buildings Equipment Initiative | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Buildings Equipment Initiative Smart Buildings Equipment Initiative Lead Performers: -- Pacific Northwest National Laboratory - Richland, WA -- National Renewable Energy Laboratory - Golden, CO DOE Funding: $2,100,000 Cost Share: N/A Project Term: Oct. 2014 - Sept. 2015 PROJECT OBJECTIVE The purpose of this project is to develop data taxonomies and standard communication protocols that enable building equipment to engage the larger electric system and to develop analytic methods and testing

  19. Bench-Scale Cross Flow Filtration of

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 Investigation of the Downwelling LW Differences Between the Niamey AMF Main and Supplementary Sites C.N. Long/Pacific Northwest National Laboratory, Richland, WA P. Gotseff/National Renewable Energy Laboratory, Golden, CO E.G. Dutton/National Oceanic and Atmospheric Administration, Boulder, CO April 2008 Work supported by the U.S. Department of Energy, Office of Science, Office of Biological and Environmental Research DISCLAIMER This report was prepared as an account of work sponsored by the

  20. 15-CS-1035 ESnet EuropeUS Map_EEX_v4

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Office of Science National Labs Ames ANL BNL FNAL JLAB Ames Laboratory (Ames, IA) Argonne National Laboratory (Argonne, IL) Brookhaven National Laboratory (Upton, NY) Fermi National Accelerator Laboratory (Batavia, IL) Thomas Jefferson National Accelerator Facility (Newport News, VA) LBNL ORNL PNNL PPPL SLAC Lawrence Berkeley National Laboratory (Berkeley, CA) Oak Ridge National Laboratory (Oak Ridge, TN) Pacific Northwest National Laboratory (Richland, WA) Princeton Plasma Physics Laboratory

  1. Advanced Building Control Solutions | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Building Control Solutions Advanced Building Control Solutions Lead Performer: Pacific Northwest National Laboratory (PNNL) - Richland, WA Partners: -- Oak Ridge National Laboratory (ORNL) - Oak Ridge, TN -- Lawrence Berkeley National Laboratory (LBNL) - Berkeley, CA FY16 DOE Funding: $1,200,000 Project Term: Current - September 30, 2016 Funding Type: Direct Lab Funding PROJECT OBJECTIVE In order to enable and ensure persistent energy savings energy savings through advancements in sensing and

  2. Advanced Open-Source Sensor Packages for Building Monitoring | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Open-Source Sensor Packages for Building Monitoring Advanced Open-Source Sensor Packages for Building Monitoring Lead Performer: Oak Ridge National Laboratory (ORNL) - Oak Ridge, TN Partners: -- Pacific Northwest National Laboratory (PNNL) - Richland, WA -- Lawrence Berkeley National Laboratory (LBNL) - Berkeley, CA FY16 DOE Funding: $575,000 Project Term: Current - September 30, 2016 Funding Type: Direct Lab Funding PROJECT OBJECTIVE As part of a multilab effort with PNNL and

  3. Building Re-tuning Training | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Re-tuning Training Building Re-tuning Training Lead Performer: Pacific Northwest National Laboratory (PNNL) - Richland, WA Partners: -- Building Owners and Managers Association (BOMA) -- APPA: Leadership in Educational Facilities -- Pennsylvania State University - Philadelphia, PA FY16 DOE Funding: $25,000 Project Term: October 1, 2011 - September 30, 2016 Funding Type: Direct Lab Funding Project Website: https://www4.eere.energy.gov/workforce/projects/buildings-retuning-training PROJECT

  4. SeQuential Pacific Biodiesel LLC | Open Energy Information

    Open Energy Info (EERE)

    Pacific Biodiesel LLC Jump to: navigation, search Name: SeQuential-Pacific Biodiesel LLC Place: Oregon Sector: Biofuels Product: JV between SeQuential Biofuels, Pacific Biodiesel,...

  5. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    -M-24 GROUNDWATER WELL-DRILLING CHANGE PACKAGE Dear Mr. Martin: This letter is in response to HAB's advice 152 regarding the M-24 groWldwaterwell-drilling Tri- party Agreement ...

  6. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Focus Group determines a change or interpretation to the HASQARD is de minimis (an editorial change or interpretation clarifying but not modifying a requirement - example...

  7. Richland Badge Request PIA

    Energy Savers [EERE]

    Retrieval Of Final Stored Radioactive Waste Resumes Retrieval Of Final Stored Radioactive Waste Resumes April 18, 2012 - 12:00pm Addthis Media Contacts Danielle Miller, DOE-Idaho Operations, 208-526-5709, millerdc@id.doe.gov Rick Dale, Idaho Treatment Group, 208-557-6552, rick.dale@amwtp.inl.gov IDAHO FALLS, ID - Operations to retrieve the estimated 6,900 cubic meters of stored transuranic waste remaining at the Idaho site began this week at the U.S. Department of Energy's Advanced Mixed Waste

  8. Richland Operations Office's Fiscal...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    October 2013 through September 2014 (fiscal year 2014) Basis of Evaluation: Performance Evaluation and Measurement Plan (PEMP) Award Fee Available: 9,815,000 Award Fee Earned:...

  9. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    G. Weiss, BHI Page 2 of 55 of 06735761 045-AMRC-OO38 -2- NUV 2 9 2004 Distribution: Mr. Harry Ohlendorf CH2M Hill (Sacramento) 2485 Natomas Park Dr., Suite 600 Sacramento,...

  10. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Director, Office of Hearings and Appeals (HG-i), U.S. Department of Energy, L'Enfant Plaza Building, 1000 Independence Avenue SW, Washington, D.C. 20585-1615, and shall be filed...

  11. Richland Analytical Building Blocks

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 $ in Thousands Draft Pre-Decisional PBS ABB Title FY 2015 FY 2015 FY 2015 Description (Range $000) Cumulative Range RL-0030 Groundwater Monitoring (GWM), integration & Assessment, and Operations & Maintenance 100,000 - 120,000 100,000 - 120,000 Accomplishes continued integration of Site-wide groundwater and vadose zone cleanup activities, groundwater contamination monitoring, as well as operations, maintenance, and necessary modifications of existing remediation systems. RL-0041 River

  12. Richland Analytical Building Blocks

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 Draft Pre-Decisional ($ in 000's) PBS Work Description Title FY 2014 Description FY 2014 ($000) FY 2014 Cumulative ($000) RL-0011 PFP Surveillance and Maintenance (S&M) and Min Safe Provide minimum safe and essential services for industrial, radiological and nuclear Plutonium Finishing Plant (PFP) facilities/structures and systems. PFP surveillance includes the monitoring of residual radioactive and chemical contamination to ensure safe and compliant condition. Activities include

  13. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 TL~ Rich land, Washington 99352 APR 0 22012 1 2-EMD-0057 Addressees - See Attached SUPPLEMENT TO DOE/RL-201 1-27, HANFORD SITE AIR OPERATING PERMIT (AOP) RENEWAL APPLICATION: COVERING THE PERIOD JANUARY 1, 2011, THROUGH DECEMBER 31, 2011 (DOE/RL-201 2-04, REV. 0) Enclosed is DOE/RL-20 12-04, Supplement to DOE/RL-20 11-27, "Hanford Site AOP Renewal Application: Covering the period January 1, 2011, through December 31, 2011." The AOP Renewal Application Supplement is being submitted in

  14. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Under Criterion 5, HNF-PRO-121 15, Work Management ... to offsite shipment of Low Specific Activity waste to Permnafix. (0A20452, ... The surveillant reviewed project-level work ...

  15. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Achievable (ALARA) Management Worksheets (AMW), and ... radioactivity and low level uptakes. * S-i ... tank was too big to fit into the 55-gallon waste drum. ...

  16. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Ron Ingram FH Facilities and Land Management (509) ... ECOLOGY COMMERCIAL LOW-LEVEL RADIOACTIVE WASTE DISPOSAL SITE CO-LOCATED ... the eligibility criteria of 10 CFR 1021.410(b), ...

  17. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Central Waste ComplexLow Level Burial Ground Management to barricade the ... Maintenance on the Waste Receiving and ... Quality Assurance Criteria, states in part, ...

  18. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    EVALUATION AND MEASUREMENT PLAN (PEMP) FEE DETERMINATION The U.S. Department of Energy ... Award Period: October 2014 through September 201 5 Basis of Evaluation: Performance ...

  19. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    unique in that it was issued by RL in 1996, and has been maintained and interpreted by a Focus Group with invited membership by technical experts from the Office of River...

  20. Richland Analytical Building Blocks

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and maintenance activities. RL-0042 FFTF Surveillance and Maintenance 2,100 - 2,600 ... PBS ABB Title FY 2015 FY 2015 FY 2015 Description RL-0042 Site Wide Services for FFTF ...

  1. Environmental Assessment for the Transfer of 1100 AREA, Southern Rail Connection and Rolling Stock, Hanford Site, Richland, Washington

    SciTech Connect (OSTI)

    N /A

    1998-08-01

    This environmental assessment (EA) has been prepared to assess potential environmental impacts associated with the U.S. Department of Energy's proposed action: the transfer of the 1100 Area, southern rail connection and rolling stock to a non-federal entity. Impact information contained herein will be used by the U.S. Department of Energy, Richland Operations Office Manager, to determine if the proposed action is a major federal action significantly affecting the quality of the human environment. If the proposed action is determined to be major and significant, an environmental impact statement will be prepared. If the proposed action is determined not to be major and significant, a Finding of No Significant Impact (FONSI) will be issued and the action can proceed. Criteria used to evaluate significance can be found in Title 40, Code of Federal Regulations (CFR) 1508.27. This EA was prepared in compliance with the ''National Environmental Policy Act'' (NEPA) of 1969, as amended, the Council on Environmental Quality (CEQ) Regulations for Implementing the Procedural Provisions of NEPA (40 CFR 1500-1508), and the U.S. Department of Energy Implementing Procedures for NEPA (10 CFR 1021). The following is a description of each section of the EA. (1) Purpose and Need for Action. This provides a brief statement concerning the problem or opportunity the U.S. Department of Energy is addressing with the proposed action. As necessary, background information is provided. (2) Description of the Proposed Action. A description with sufficient detail to identify potential environmental impacts is provided. (3) Alternatives to the Proposed Action. Reasonable alternative actions, which would address the Purpose and Need, are described. A no action alternative, as required by 10 CFR 1021, also is described. (4) Affected Environment. This provides a brief description of the locale in which the proposed action takes place, and which may be environmentally impacted. (5) Environmental Impacts. The range of environmental impacts, beneficial and adverse, are described for the proposed action. Impacts of alternatives briefly are discussed. (6) Permits and Regulatory Requirements. A brief description of permits and regulatory requirements for the proposed action is provided. (7) Organizations Consulted. Any outside agencies, groups, or individuals contacted as part of environmental assessment documentation preparation are listed. (8) References. Documents used to provide information or data are listed. The appendices contain additional information necessary to support an understanding of the proposed action, alternatives, and potential impacts is provided. Comments resulting from review of the environmental assessment by states and tribes or other stakeholders and the response to those comments will be included in the appendices.

  2. file://L:\DOE-hanford.gov\public\boards\hab\advice\advice100.ht

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Chuck Clarke, Regional Administrator U.S. Environmental Protection Agency, Region 10 1200 Sixth Avenue Seattle, WA 98101 Tom Fitzsimmons, Director Washington Department of Ecology P.O. Box 47600 Olympia, WA 98504-7600 Keith Klein, Manager U.S. Department of Energy, Richland Operations P.O. Box 550 (A7-50) Richland, WA 99352 Dick French, Manager Office of River Protection 2440 Stevens Center Richland, WA 99352 Subject: TPA Agency Processes for Responding to HAB Consensus Advice Dear Messrs.

  3. file://L:\DOE-hanford.gov\public\boards\hab\advice\advice111.ht

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0 Keith Klein, Manager U.S. Department of Energy, Richland Operations P.O. Box 550 (A7-50) Richland, WA 99352 Harry Boston, Manager Office of River Protection 2440 Stevens Center Richland, WA 99352 Chuck Findley, Regional Administrator U.S. Environmental Protection Agency, Region 10 1200 Sixth Avenue Seattle, WA 98101 Tom Fitzsimmons, Director Washington Department of Ecology P.O. Box 47600 Olympia, WA 98504-7600 Subject: FY2001 Performance Measures Dear Messrs. Klein, Boston, Findley, and

  4. Pacific Northwest Climate Science Conference | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pacific Northwest Climate Science Conference Pacific Northwest Climate Science Conference November 4, 2015 8:30AM PST to November 5, 2015 5:30PM PST Coeur d'Alene, Idaho The...

  5. Now Available: Pacific Northwest Smart Grid Demonstration Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pacific Northwest Smart Grid Demonstration Project - Technology Performance Report Volume 1 Now Available: Pacific Northwest Smart Grid Demonstration Project - Technology ...

  6. EA-1958: Draft Environmental Assessment

    Broader source: Energy.gov [DOE]

    Development on the South Federal Campus, Pacific Northwest National Laboratory, Richland, Washington

  7. EA-1562: Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    Construction and Operation of a Physical Sciences Facility at the Pacific Northwest National Laboratory, Richland, Washington

  8. Accident investigation board report on the May 14, 1997, chemical explosion at the Plutonium Reclamation Facility, Hanford Site,Richland, Washington - final report

    SciTech Connect (OSTI)

    Gerton, R.E.

    1997-07-25

    On May 14, 1997, at 7:53 p.m. (PDT), a chemical explosion occur-red in Tank A- 109 in Room 40 of the Plutonium Reclamation Facility (Facility) located in the 200 West Area of the Hanford Site, approximately 30 miles north of Richland, Washington. The inactive processing Facility is part of the Plutonium Finishing Plant (PFP). On May 16, 1997, Lloyd L. Piper, Deputy Manager, acting for John D. Wagoner, Manager, U.S. Department of Energy (DOE), Richland Operations Office (RL), formally established an Accident Investigation Board (Board) to investigate the explosion in accordance with DOE Order 225. 1, Accident Investigations. The Board commenced its investigation on May 15, 1997, completed the investigation on July 2, 1997, and submitted its findings to the RL Manager on July 26, 1997. The scope of the Board`s investigation was to review and analyze the circumstances of the events that led to the explosion; to analyze facts and to determine the causes of the accident; and to develop conclusions and judgments of need that may help prevent a recurrence of the accident. The scope also included the application of lessons learned from similar accidents within DOE. In addition to this detailed report, a companion document has also been prepared that provides a concise summary of the facts and conclusions of this report, with an emphasis on management issues (DOE/RL-97-63).

  9. Pacific Aquafarms Aquaculture Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Aquaculture Low Temperature Geothermal Facility Facility Pacific Aquafarms Sector Geothermal energy Type Aquaculture Location Niland, California Coordinates 33.2400366,...

  10. EIS-0473: W.A. Parish Post-Combustion CO2 Capture and Sequestration Project (PCCS), Fort Bend County, TX

    Broader source: Energy.gov [DOE]

    This EIS evaluates the environmental impacts of a proposal to provide financial assistance for a project proposed by NRG Energy, Inc (NRG). DOE selected NRG’s proposed W.A. Parish Post-Combustion CO2 Capture and Sequestration Project for a financial assistance award through a competitive process under the Clean Coal Power Initiative Program. NRG would design, construct and operate a commercial-scale carbon dioxide (CO2) capture facility at its existing W.A. Parish Generating Station in Fort Bend County, Texas; deliver the CO2 via a new pipeline to the existing West Ranch oil field in Jackson County, Texas, for use in enhanced oil recovery operations; and demonstrate monitoring techniques to verify the permanence of geologic CO2 storage.

  11. Origin State>> CA ID ID ID IL KY NV NY NY OH TN TN TN, WA, CA

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NV NY NY OH TN TN TN, WA, CA TN TN TN TN TX Total Shipments by Route Lawrence Livermore National Laboratory Advanced Mixed Waste Treatment Project Batelle Energy Alliance Idaho National Laboratory Argonne National Laboratory Paducah Gaseous Diffusion Plant National Security Technologies Brookhaven National Laboratory West Valley Environmental Services Portsmouth Gaseous Diffusion Plant Duratek/Energy Solutions Babcox & Wilcox Technical Services Y-12 Plant Materials & Energy Corporation

  12. Origin State>> CA ID ID ID IL MD NM NM NY OH TN TN TN, WA, CA

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NY OH TN TN TN, WA, CA TN TN TN TX Total Shipments by Route Lawrence Livermore National Laboratory Batelle Energy Alliance Idaho National Laboratory Advanced Mixed Waste Treatment Project Argonne National Laboratory Aberdeen Proving Ground Sandia National Laboratory Los Alamos National Laboratory Brookhaven National Laboratory Portsmouth Gaseous Diffusion Plant Duratek/Energy Solutions Babcox & Wilcox Technical Services Y-12 Plant Materials & Energy Corporation (M&EC) Perma-Fix

  13. Origin State>> CA ID ID ID IL NM NM OH TN TN TN, WA, CA TN TN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NM NM OH TN TN TN, WA, CA TN TN TN TN TX Total Shipments by Route Lawrence Livermore National Laboratory Batelle Energy Alliance Idaho National Laboratory Advanced Mixed Waste Treatment Project Argonne National Laboratory Sandia National Laboratory Los Alamos National Laboratory Portsmouth Gaseous Diffusion Plant Duratek/Energy Solutions Babcox & Wilcox Technical Services Y-12 Plant Materials & Energy Corporation (M&EC) Perma-Fix Nuclear Fuels Services Wastren Advantage, Inc.

  14. Origin State>> CA ID ID IL IL KY NM NM NV NY OH TN TN TN, WA,

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    IL IL KY NM NM NV NY OH TN TN TN, WA, CA TN TN TN TN Total Shipments by Route Lawrence Livermore National Laboratory Batelle Energy Alliance Idaho National Laboratory Energx Argonne National Laboratory Argonne National Laboratory Paducah Gaseous Diffusion Plant Sandia National Laboratory Los Alamos National Laboratory National Security Technologies West Valley Environmental Services Portsmouth Gaseous Diffusion Plant Duratek/Energy Solutions Babcox & Wilcox Technical Services Y-12 Plant

  15. Central Equatorial Pacific Experiment (CEPEX)

    SciTech Connect (OSTI)

    Not Available

    1993-01-01

    The Earth's climate has varied significantly in the past, yet climate records reveal that in the tropics, sea surface temperatures seem to have been remarkably stable, varying by less than a few degrees Celsius over geologic time. Today, the large warm pool of the western Pacific shows similar characteristics. Its surface temperature always exceeds 27[degree]C, but never 31[degree]C. Heightened interest in this observation has been stimulated by questions of global climate change and the exploration of stabilizing climate feedback processes. Efforts to understand the observed weak sensitivity of tropical sea surface temperatures to climate forcing has led to a number of competing ideas about the nature of this apparent thermostat. Although there remains disagreement on the processes that regulate tropical sea surface temperature, most agree that further progress in resolving these differences requires comprehensive field observations of three-dimensional water vapor concentrations, solar and infrared radiative fluxes, surface fluxes of heat and water vapor, and cloud microphysical properties. This document describes the Central Equatorial Pacific Experiment (CEPEX) plan to collect such observations over the central equatorial Pacific Ocean during March of 1993.

  16. Hanford Sitewide Probabilistic Seismic Hazard Analysis

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    I - Kappa Analysis ESTIMATION OF KAPPA Final Report, Rev 1 2/18/2014 Pacific Engineering and Analysis Prepared by Walter Silva Bob Darragh Prepared for: Pacific Northwest National Laboratory 902 Battelle Boulevard Richland, WA TABLE OF CONTENTS 1.0 Estimation of Kappa 1 2.0 Assessment of Uncertainty in Kappa 8 3.0 Stress Drops 10 References 10 TABLES Table 1: Earthquake Summary 11 Table 2: 2004 Analysis (PNNL, 2005) Catalog 12 Table 3: Catalog of Additional Sites and Earthquakes 13 Table 4:

  17. Contract Management | U.S. DOE Office of Science (SC)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract Management Pacific Northwest Site Office (PNSO) PNSO Home About Projects Contract Management NEPA Documents Resources Contact Information Pacific Northwest Site Office U.S. Department of Energy P.O. Box 350, MS K9-42 Richland, WA 99352 P: (509) 372-4005 Contract Management Print Text Size: A A A FeedbackShare Page The beginnings of this Laboratory are rooted in the history of the Hanford Site and its evolution over time, from a production effort, to a Cold War deterrent, evolving to

  18. Department

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    * Paul Davis, Acting Chairman, Richland Operations Office, 376-3371 * Melanie Fletcher, Pacific Northwest SteOffice, 372-4863 * Joyce Gilbert, Richland Operations Office,...

  19. Pacific Solar Pty Ltd | Open Energy Information

    Open Energy Info (EERE)

    to: navigation, search Name: Pacific Solar Pty Ltd Place: Botany, New South Wales, Australia Sector: Solar Product: Developed crystaline silicon on glass (CSG) technology...

  20. Asian American Pacific Islander Heritage Month

    Broader source: Energy.gov [DOE]

    Generations of Asian Americans and Pacific Islanders (AAPIs) have helped make America what it is today. Their histories recall bitter hardships and proud accomplishments -- from the laborers who...

  1. Pacific Power Management | Open Energy Information

    Open Energy Info (EERE)

    Power Management Jump to: navigation, search Name: Pacific Power Management Place: Auburn, California Zip: 95602-9022 Product: A specialist provider of commercial PV systems;...

  2. Pacific Biodiesel Inc | Open Energy Information

    Open Energy Info (EERE)

    Biodiesel Inc Jump to: navigation, search Name: Pacific Biodiesel Inc Place: Kahului, Hawaii Zip: 96732 Product: Hawaii-based biodiesel plant designer, producer and distributor in...

  3. Pacific Fuel Cell Corporation | Open Energy Information

    Open Energy Info (EERE)

    Fuel Cell Corporation Jump to: navigation, search Name: Pacific Fuel Cell Corporation Address: 26985 Lakeland Blvd. Place: Euclid, Ohio Zip: 44132 Sector: Buildings, Efficiency,...

  4. Independent Oversight Review, Pacific Northwest National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    conducted May 15-17, 2012, at the Department of Energy's (DOE) Pacific Northwest National Laboratory by the DOE Office of Safety and Emergency Management Evaluations, which is...

  5. ARM - Lesson Plans: Tropical Western Pacific

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Barrow, Alaska Tropical Western Pacific Site Tours Contacts Students Study Hall About ARM Global Warming FAQ Just for Fun Meet our Friends Cool Sites Teachers Teachers' Toolbox ...

  6. Pacific Light Power | Open Energy Information

    Open Energy Info (EERE)

    Power Jump to: navigation, search Name: Pacific Light & Power Place: Anahola, Hawaii Zip: 96703 Sector: Solar Product: Hawaii-based which develops mainly solar projects....

  7. Pacific Blue Energy | Open Energy Information

    Open Energy Info (EERE)

    Blue Energy Jump to: navigation, search Name: Pacific Blue Energy Place: Flagstaff, Arizona Zip: 86001 Sector: Solar Product: Arizona-based solar project developer. Coordinates:...

  8. Pacific Lumber Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    NEEDS 2006 Database Retrieved from "http:en.openei.orgwindex.php?titlePacificLumberBiomassFacility&oldid397905" Feedback Contact needs updating Image needs updating...

  9. Green Pacific Biologicals Inc | Open Energy Information

    Open Energy Info (EERE)

    California Product: A California-based company that has a patent on a technology for nuclear-genetic engineering of algae for biofuel production. References: Green Pacific...

  10. Pacific Power- Blue Sky Community Project Funds

    Broader source: Energy.gov [DOE]

    Note: Pacific Power is currently accepting applications for 2016 Funding Awards. The deadline for submittal is May 31, 2016 5 PM PT. 

  11. Pacific Power - Residential Energy Efficiency Rebate Programs...

    Broader source: Energy.gov (indexed) [DOE]

    Administrator Pacific Power Website http:www.homeenergysavings.netCaliforniaforms.html State California Program Type Rebate Program Rebate Amount Clothes Washers: 50-75...

  12. Pacific Northwest National Laboratory - Reservoir Stimulation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    a string of significant recognitions and accomplishments for Dr. Carlos Fernandez and his team from Pacific Northwest National Laboratory (PNNL) for their GTO-funded research in...

  13. Science Frontiers Pacific Northwest National Laboratory (PNNL...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Science Frontiers Pacific Northwest National Laboratory (PNNL), a U.S. Department of Energy Office of Science Laboratory, is pushing the frontiers of science in areas that are ...

  14. Inland Pacific Energy Center | Open Energy Information

    Open Energy Info (EERE)

    search Name: Inland Pacific Energy Center Place: Stanfield, Oregon Sector: Biofuels Product: Biofuels producer currently developing a portfolio of ethanol and biodiesel...

  15. Pacific Power- Residential Energy Efficiency Rebate Programs

    Broader source: Energy.gov [DOE]

    Pacific Power offers the Home Energy Savings Program for their residential California customers to improve the efficiency of their homes. Incentives are also available for contractors and newly...

  16. Pacific Northwest National Laboratory Grounds Maintenance

    SciTech Connect (OSTI)

    2009-08-05

    FEMP Water Efficiency Best Management Practice #4 and #5: Case study overview of the grounds maintenance program for Pacific Northwest National Laboratory.

  17. Asia-Pacific energy database

    SciTech Connect (OSTI)

    1997-06-01

    Statistical data is presented in graphic and tabular form on the petroleum market in Asia and Pacific nations. Seven major categories are reported: (1) primary energy production and consumption; (2) historical petroleum product demand and forecasts; (3) crude oil production and exports; (4) import dependence; (5) crude and product pricing assumptions; (6) market share of refined products by suppliers in selected countries; and (7) refining margins. Petroleum demand and forecasts and crude oil production and exports are reported by country. Historical data are presented from 1970 through 1996, and forecasts are made through 2010.

  18. Asian and Pacific Centre for Transfer of Technology (APCTT) ...

    Open Energy Info (EERE)

    Asia and the Pacific (UNESCAP) servicing the Asia-Pacific region. It was established in 1977 with the objective of facilitating technology transfer in the Asia-Pacific region. The...

  19. MACDoNALD HOAGUE B,

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Department of Energy Richland Operations Office PO Box 550 Richland, WA 99352 Of Counsel Robert A. Free Daniel Hoyt Smith Re: Freedom of Information Act Request Dear Ms, Riehle: I...

  20. Microsoft Word - HABAdv#219 ERDF.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations P.O. Box 550 (A7-50) Richland, WA 99352 Dennis Faulk, Program Manager U.S. Environmental Protection Agency, Region 10 309 Bradley Blvd, Suite 115 (B1-46) Richland,...

  1. file://L:\\DOE-hanford.gov\\public\\boards\\hab\\advice\\advice51.htm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of Energy, Richland Operations PO Box 550 (A7-50) Richland, WA 99352 RE: A Public Involvement Process for the 10-Year Plan Dear Messrs. Alm and Wagoner: Public involvement is...

  2. Royal Pacific: Order (2013-SE-33004)

    Broader source: Energy.gov [DOE]

    DOE ordered Royal Pacific, Ltd. to pay a $8,000 civil penalty after finding Royal Pacific had failed to certify that various basic models of medium base compact fluorescent lamps, ceiling fans, ceiling fan light kits, and illuminated exit signs comply with the applicable energy conservation standards.

  3. HIA 2015 DOE Zero Energy Ready Home Case Study: TC Legend Homes, Bellingham Power House, Bellingham, WA

    Energy Savers [EERE]

    Bellingham Power House Bellingham, WA DOE ZERO ENERGY READY HOME(tm) The U.S. Department of Energy invites home builders across the country to meet the extraordinary levels of excellence and quality specified in DOE's Zero Energy Ready Home program (formerly known as Challenge Home). Every DOE Zero Energy Ready Home starts with ENERGY STAR Certified Homes Version 3.0 for an energy-efficient home built on a solid foundation of building science research. Advanced technologies are designed in to

  4. SeaPower Pacific subsidiary of Renewable Energy Holdings Plc...

    Open Energy Info (EERE)

    SeaPower Pacific subsidiary of Renewable Energy Holdings Plc Carnegie Corporation Ltd Jump to: navigation, search Name: SeaPower Pacific subsidiary of Renewable Energy Holdings Plc...

  5. Asia-Pacific Regional Climate Change Adaptation Assessment |...

    Open Energy Info (EERE)

    Pacific Regional Climate Change Adaptation Assessment Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Asia-Pacific Regional Climate Change Adaptation Assessment Agency...

  6. MIE Regional Climate Change Impact Webinar Series: Hawaii & Pacific...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    MIE Regional Climate Change Impact Webinar Series: Hawaii & Pacific Islands MIE Regional Climate Change Impact Webinar Series: Hawaii & Pacific Islands November 5, 2015 1:00PM to...

  7. Energy, Transportation Ministers from Asia-Pacific Nations Pledge...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy, Transportation Ministers from Asia-Pacific Nations Pledge Cooperation on Cleaner, More Energy-Efficient Transportation Energy, Transportation Ministers from Asia-Pacific ...

  8. Rock the Watt: An Energy Conservation Campaign at Pacific Northwest...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rock the Watt: An Energy Conservation Campaign at Pacific Northwest National Lab Rock the Watt: An Energy Conservation Campaign at Pacific Northwest National Lab Case study ...

  9. ARM - Lesson Plans: The Pacific and El Nio

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The Pacific and El Nio Outreach Home Room News Publications Traditional Knowledge Kiosks Barrow, Alaska Tropical Western Pacific Site Tours Contacts Students Study Hall About ARM...

  10. Before the House Foreign Affairs Subcommittee on Asia, the Pacific...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Foreign Affairs Subcommittee on Asia, the Pacific and the Global Environment Before the House Foreign Affairs Subcommittee on Asia, the Pacific and the Global Environment Before...

  11. Microsoft Word - HABAdv #234_FY2012_Budget_Requests.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Protection Agency, Region 10 309 Bradley Blvd., Suite 115 Richland, WA 99352 Jane Hedges, Program Manager Washington State Department of Ecology 3100 Port of Benton...

  12. Microsoft Word - HABAdv#237EECA.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Protection Agency, Region 10 309 Bradley Blvd,, Suite 115 Richland WA 99352 Jane Hedges, Program Manager Washington State Department of Ecology 3100 Port of Benton...

  13. Microsoft Word - HABAdv#227_ModelingvsCharacterization.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Protection Agency, Region 10 309 Bradley Blvd., Suite 115 Richland, WA 99352 Jane Hedges, Program Manager Washington State Department of Ecology 3100 Port of Benton...

  14. Microsoft Word - 2012O-01.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Protection Agency, Region 10 309 Bradley Blvd,, Suite 115 Richland WA 99352 Jane Hedges, Program Manager Washington State Department of Ecology 3100 Port of Benton...

  15. Microsoft Word - HABAdv #232_ARRA_Funding.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Protection Agency, Region 10 309 Bradley Blvd., Suite 115 Richland, WA 99352 Jane Hedges, Program Manager Washington State Department of Ecology 3100 Port of Benton...

  16. "Title","Creator/Author","Publication Date","OSTI Identifier...

    Office of Scientific and Technical Information (OSTI)

    Northwest Labs., Richland, WA (USA)","Not Available","15 GEOTHERMAL ENERGY; 29 ENERGY PLANNING, POLICY AND ECONOMY; 32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION; DISTRICT...

  17. Notices

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, WA ... and the DOE NEPA Implementing Procedures at 10 CFR Part 1021. The ...

  18. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    Office of Classification Hanford Site (HNF), Richland, WA (United States) Idaho Chemical Processing Plant, Idaho Falls, ID (United States) Idaho National Engineering Laboratory,...

  19. FINAL MEETING SUMMARY HANFORD ADVISORY BOARD TANK WASTE COMMITTEE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    TANK WASTE COMMITTEE September 11, 2013 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 System Plan Assumptions ............................................................................................................................. 1 System Plan Models

  20. "Title","Creator/Author","Publication Date","OSTI Identifier...

    Office of Scientific and Technical Information (OSTI)

    Northwest National Laboratory (PNNL), Richland, WA (US)","USDOE","Reprocessing; Silver-functionalized arogel; Radioiodine; Aging; Sorption; BET; SEM; XRD",,"This...

  1. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    ... Northwest National Laboratory (PNNL), Richland, WA ... (1) amplitudes (1) animal tissues (1) basic ... We have identified small-molecule benzisoxazole derivatives ...

  2. QA Corporate Board Meeting - November 2012 | Department of Energy

    Energy Savers [EERE]

    Corporate Board Meeting Meeting Location: Richland, WA - Office of River Protection Room: 2440 Stevens Center - Room 2311 Agenda for November 27, 2012 Documents Available for...

  3. Ability of TiO2(110) Surface to Be Fully Hydroxylated and Fully...

    Office of Scientific and Technical Information (OSTI)

    spectroscopy and density functional theory results, we show that the attained "super ... Laboratory (PNNL), Richland, WA (US), Environmental Molecular Sciences Laboratory (EMSL) ...

  4. "Title","Creator/Author","Publication Date","OSTI Identifier...

    Office of Scientific and Technical Information (OSTI)

    Northwest National Laboratory (PNNL), Richland, WA (US)","USDOE","Light-emitting diode (LED), color shift, color stability, color maintenance, warranty",,"Synopsis:...

  5. EA-1728: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1728: Final Environmental Assessment Final Environmental Assessment for Integrated Vegetation Management of the Hanford Site, Richland, WA This EA...

  6. HANFORD DOUBLE SHELL TANK THERMAL AND SEISMIC PROJECT SENSITIVITY...

    Office of Scientific and Technical Information (OSTI)

    Visit OSTI to utilize additional information resources in energy science and technology. A ... Research Org: Hanford Site (HNF), Richland, WA Sponsoring Org: USDOE Assistant Secretary ...

  7. FINAL REPORT FOR THE REDUCTION OF CHROME (VI) TO CHROME (III...

    Office of Scientific and Technical Information (OSTI)

    Visit OSTI to utilize additional information resources in energy science and technology. A ... Research Org: Hanford Site (HNF), Richland, WA Sponsoring Org: USDOE Assistant Secretary ...

  8. HANFORD DOUBLE SHELL TANK THERMAL AND SEISMIC PROJECT SUMMARY...

    Office of Scientific and Technical Information (OSTI)

    Visit OSTI to utilize additional information resources in energy science and technology. A ... Research Org: Hanford Site (HNF), Richland, WA Sponsoring Org: USDOE Assistant Secretary ...

  9. HANFORD DOUBLE SHELL TANK THERMAL AND SEISMIC PROJECT BUCKLING...

    Office of Scientific and Technical Information (OSTI)

    Visit OSTI to utilize additional information resources in energy science and technology. A ... Research Org: Hanford Site (HNF), Richland, WA Sponsoring Org: USDOE Assistant Secretary ...

  10. EIS-0391: Updated Notice of Public Hearings | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Tank Closure and Waste Management for the Hanford Site, Richland, WA Notice of Public Hearings on the Draft Tank Closure and Waste Management Environmental Impact Statement for the...

  11. EIS-0391: Extension of the Public Comment Period | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Tank Closure and Waste Management for the Hanford Site, Richland, WA Extension of the Public Comment Period for the Draft Tank Closure and Waste Management Environmental Impact...

  12. EIS-0467: Notice of Intent to Prepare an Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Notice of Floodplains and Wetlands Involvement Acquisition of a Natural Gas Pipeline and Natural Gas Utility Service at the Hanford Site, Richland, WA, and Notice of...

  13. DOE Zero Energy Ready Home Case Study: Palo Duro Homes - Palo...

    Office of Scientific and Technical Information (OSTI)

    National Laboratory (PNNL), Richland, WA (United States) Sponsoring Org: USDOE Office of Energy Efficiency and Renewable Energy (EERE), Building Technologies Office (EE-5B)...

  14. Building America Top Innovations 2014 Profile: California Energy...

    Office of Scientific and Technical Information (OSTI)

    National Laboratory (PNNL), Richland, WA (United States) Sponsoring Org: USDOE Office of Energy Efficiency and Renewable Energy (EERE), Building Technologies Office (EE-5B)...

  15. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    Memorial Institute (United States) Bechtel Hanford Inc. (BHI), Richland, WA (United ... Development (United States) Research Org: Sponsoring Org: Publication Date: to ...

  16. Microsoft Word - FINAL_Dec08HAB_Summary.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    December 4 - 5, 2008 Richland, WA Topics in This Meeting Summary Executive Summary........................................................................................................................................ 1 Welcome, Introductions and Announcements ................................................................................................ 2 Confirm September Meeting Summary Adoption .......................................................................................... 3

  17. Slide 1

    Office of Environmental Management (EM)

    ... TDD, Post Closure Administration and Community and ... Continue closure activities of two tanks at Savannah River Site. ... and Immobilization Plant - Richland, WA Hanford's ...

  18. Solid Phase Characterization of Solids Recovered from Failed...

    Office of Scientific and Technical Information (OSTI)

    Research Org: Hanford Site (HNF), Richland, WA (United States) Sponsoring Org: USDOE Office of Environmental Management (EM) Contributing Orgs: Washington River Protection ...

  19. Recent Improvements In Interface Management For Hanfords Waste...

    Office of Scientific and Technical Information (OSTI)

    Research Org: Hanford Site (HNF), Richland, WA (United States) Sponsoring Org: USDOE Office of Environmental Management (EM) (United States) Country of Publication: United States ...

  20. "Title","Creator/Author","Publication Date","OSTI Identifier...

    Office of Scientific and Technical Information (OSTI)

    Northwest National Laboratory (PNNL), Richland, WA (US)","USDOE","LED lighting; parking lot lighting; occupancy sensors",,"Occupancy sensor systems are gaining...

  1. Consent Order EA-2005-01

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    20585 July 28, 2005 Mr. T. E. Logan, President Bechtel Hanford, Inc. 3070 George Washington Way Richland, WA 99352 Consent Order 2005-01 Subject: Consent Order Incorporating ...

  2. "Title","Creator/Author","Publication Date","OSTI Identifier...

    Office of Scientific and Technical Information (OSTI)

    National Laboratory (PNNL), Richland, WA (US)","USDOE","LED; light-emitting diode; CFL; incandescent; halogen; lamp; bulb; TCLP; STLC; TTLC; WET; hazardous waste; electronic...

  3. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9, 2012 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU COMMITTEE August 9, 2012 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Committee Business ...................................................................................................................................... 4 Attachments

  4. Microsoft Word - FINAL_PIC_Jan2007_summary.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    January 31, 2007 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD PUBLIC INVOLVEMENT AND COMMUNICATION COMMITTEE MEETING January 31, 2007 Richland, WA Topics in this Meeting Summary...

  5. 2012_0411_PIC_Meeting_Summary_v1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Meeting Summary October 31, 2012 DRAFT MEETING SUMMARY HANFORD ADVISORY BOARD PUBLIC INVOLVEMENT & COMMUNICATIONS COMMITTEE MEETING October 31, 2012 Richland, WA Topics in this...

  6. EIS-0467: Notice of Intent to Prepare an Environmental Impact Statement and Notice of Floodplains and Wetlands Involvement

    Broader source: Energy.gov [DOE]

    Acquisition of a Natural Gas Pipeline and Natural Gas Utility Service at the Hanford Site, Richland, WA, and Notice of Floodplains and Wetlands Involvement

  7. Energy Secretary Bodman Statement on Hanford Solid Waste Settlement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement on Hanford Solid Waste Settlement Agreement Energy Secretary Bodman Statement on Hanford Solid Waste Settlement Agreement January 9, 2006 - 9:43am Addthis Richland, WA - ...

  8. HIA 2015 DOE Zero Energy Ready Home Case Study: Clifton View Homes, Marine Drive and Port Hadlcok, Coupeville and Port Hadlock WA

    Energy Savers [EERE]

    Homes Marine Drive and Port Hadlock Coupeville, WA Port Hadlock, WA DOE ZERO ENERGY READY HOME(tm) The U.S. Department of Energy invites home builders across the country to meet the extraordinary levels of excellence and quality specified in DOE's Zero Energy Ready Home program (formerly known as Challenge Home). Every DOE Zero Energy Ready Home starts with ENERGY STAR Certified Homes Version 3.0 for an energy-efficient home built on a solid foundation of building science research. Advanced

  9. Pacific Rim Summit on Industrial Biotechnology & Bioenergy

    Broader source: Energy.gov [DOE]

    The ninth annual Pacific Rim Summit on Industrial Biotechnology and Bioenergy will be held from December 7–9, 2014, in San Diego, California, at the Westin Gaslamp Quarter. Bringing together representatives from various countries all around the Pacific Rim, this event will focus on the growth of the industrial biotechnology and bioenergy sectors in North America and the Asia-Pacific region. Glenn Doyle, BETO's Deployment & Demonstration Technology Manager, will be moderating and speaking at a session on entitled "Utilizing Strategic Partnerships to Grow Your Business" on December 9.

  10. Independent Oversight Inspection, Pacific Northwest National Laboratory- December 2003

    Broader source: Energy.gov [DOE]

    Inspection of Environment, Safety, and Health Management at the Pacific Northwest National Laboratory

  11. DRAFT ADVICE ? UNACCEPTABLE PROGRAM IMPACTS UNDER FY 97 BUDGET

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Department of Energy, Office of River Protection P.O. Box 450 Richland, WA 99352 Linda Hoffman, Director Washington State Department of Ecology P.O. Box 47600 Olympia, WA...

  12. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    December 8, 2015 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU COMMITTEE December 8, 2015 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Update on 100-D/H Proposed Plan ............................................................................................................... 2 WA-1 Remedial Investigation/Feasibility

  13. Hanford Challenge

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Challenge 219 tst Ave S, Suite 120 Seattle, WA 98104 2013.292.2850 hanfordchallenge.org June 1,2010 Dorothy Riehle FOlA Office U.S. Department of Energy P. O. Box 550 Richland, WA...

  14. Pacific Gas & Electric Co | Open Energy Information

    Open Energy Info (EERE)

    PG&E) Jump to: navigation, search Name: Pacific Gas & Electric Co Abbreviation: PGE Place: California Service Territory: California Phone Number: 800-743-5002 Website: www.pge.com...

  15. Royal Pacific: Proposed Penalty (2013-SE-33004)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Royal Pacific, Ltd. failed to certify ceiling fans, ceiling fan light kits, medium base compact fluorescent lamps, and illuminated exit signs as compliant with the applicable energy conservation standards.

  16. Pacific Northwest National Laboratory- Reservoir Stimulation Optimization

    Broader source: Energy.gov [DOE]

    2015 marked a string of significant recognitions and accomplishments for Dr. Carlos Fernandez and his team from Pacific Northwest National Laboratory (PNNL) for their GTO-funded research in...

  17. Pacific Northwest Generating Coop | Open Energy Information

    Open Energy Info (EERE)

    NERC WECC Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Wholesale Marketing Yes This article is a stub. You can help OpenEI by expanding it. Pacific...

  18. Pacific, Washington: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Map This article is a stub. You can help OpenEI by expanding it. Pacific is a city in King County and Pierce County, Washington. It falls under Washington's 9th congressional...

  19. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. See Schedule ROCKVILLE MD 208506247 053506312 COMPUTER SCIENCES CORPORATION Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office 10EM000987 See Block 16C 111 7 1 13. THIS ITEM ONLY

  20. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Report ROCKVILLE MD 208506247 053506312 COMPUTER SCIENCES CORPORATION Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office 10EM001711 See Block 16C 113 7 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING

  1. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 ROCKVILLE MD 208506247 053506312 COMPUTER SCIENCES CORPORATION Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office 10EM002050 See Block 16C 115 8 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND

  2. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Not Applicable ROCKVILLE MD 208506247 053506312 COMPUTER SCIENCES CORPORATION Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office 10EM003531 See Block 16C 121 20 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12.

  3. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    N/A ROCKVILLE MD 208506247 053506312 COMPUTER SCIENCES CORPORATION Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office 10EM003731 See Block 16C 122 60 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING

  4. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    attached Financial Plan Report #19 ROCKVILLE MD 208506247 053506312 COMPUTER SCIENCES CORPORATION Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office 10EM003760 09/22/2010 124 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN

  5. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Attached Financial Plan Report #20 ROCKVILLE MD 208506247 053506312 COMPUTER SCIENCES CORPORATION Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office 10EM003961 See Block 16C 125 8 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED

  6. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 ROCKVILLE MD 208506247 053506312 COMPUTER SCIENCES CORPORATION Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office 11EM000721 See Block 16C 130 3 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND

  7. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 ROCKVILLE MD 208506247 053506312 COMPUTER SCIENCES CORPORATION Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office 11EM001026 See Block 16C 133 5 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND

  8. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reports 6 and 7 ROCKVILLE MD 208506247 053506312 COMPUTER SCIENCES CORPORATION Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office See Schedule 04/08/2011 136 8 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12.

  9. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Not Applicable ROCKVILLE MD 208506247 053506312 COMPUTER SCIENCES CORPORATION Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office 11EM002351 04/19/2011 138 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12.

  10. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Report #9 ROCKVILLE MD 208506247 053506312 COMPUTER SCIENCES CORPORATION Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office 11EM002679 See Block 16C 140 7 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12.

  11. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Report ROCKVILLE MD 208506247 053506312 COMPUTER SCIENCES CORPORATION Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office 11EM002952 See Block 16C 141 8 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING

  12. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Report #11 ROCKVILLE MD 208506247 053506312 COMPUTER SCIENCES CORPORATION Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office 11EM003463 08/11/2011 143 7 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING

  13. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    See Attached Financial Plan Report #1 ROCKVILLE MD 208506247 053506312 COMPUTER SCIENCES CORPORATION Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office See Schedule 10/01/2011 149 9 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS

  14. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Not Applicable ROCKVILLE MD 208506247 053506312 COMPUTER SCIENCES CORPORATION Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office 12EM000245 11/04/2011 150 3 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12.

  15. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ROCKVILLE MD 208506247 053506312 COMPUTER SCIENCES CORPORATION Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office 12EM000764 See Block 16C 154 5 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND

  16. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Not Applicable ROCKVILLE MD 208506247 053506312 COMPUTER SCIENCES CORPORATION Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office 12EM001364 See Block 16C 158 3 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12.

  17. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Report ROCKVILLE MD 208506247 053506312 COMPUTER SCIENCES CORPORATION Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office 12EM001616 03/23/2012 159 5 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND

  18. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Report #14 ROCKVILLE MD 208506247 053506312 COMPUTER SCIENCES CORPORATION Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office 12EM001814 04/06/2012 160 11 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12.

  19. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 ROCKVILLE MD 208506247 053506312 COMPUTER SCIENCES CORPORATION Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office 12EM002117 See Block 16C 161 4 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND

  20. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Not Applicable ROCKVILLE MD 208506247 053506312 COMPUTER SCIENCES CORPORATION Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office 06/28/2012 162 3 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND

  1. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    N/A ROCKVILLE MD 208506247 053506312 COMPUTER SCIENCES CORPORATION Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office See Block 16C 163 3 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND

  2. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 ROCKVILLE MD 208506247 053506312 COMPUTER SCIENCES CORPORATION Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office 12EM002781 See Block 16C 164 9 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND

  3. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 ROCKVILLE MD 208506247 053506312 COMPUTER SCIENCES CORPORATION Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office 12EM003254 See Block 16C 165 8 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND

  4. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    17 ROCKVILLE MD 208506247 053506312 COMPUTER SCIENCES CORPORATION Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office 12EM002868 See Block 16C 166 7 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND

  5. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    19 ROCKVILLE MD 208506247 053506312 COMPUTER SCIENCES CORPORATION Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office 12EM003628 See Block 16C 167 7 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND

  6. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Not Applicable ROCKVILLE MD 208506247 053506312 COMPUTER SCIENCES CORPORATION Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office N/A 11/09/2012 168 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING

  7. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ROCKVILLE MD 208506247 053506312 COMPUTER SCIENCES CORPORATION Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office 09EM001278 See Block 16C 097 13 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND

  8. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    See Schedule ROCKVILLE MD 208506247 053506312 COMPUTER SCIENCES CORPORATION Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office 09EM001402 See Block 16C 098 47 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12.

  9. Celebrating Asian American Pacific Islander Heritage Month at the Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department | Department of Energy Celebrating Asian American Pacific Islander Heritage Month at the Energy Department Celebrating Asian American Pacific Islander Heritage Month at the Energy Department May 1, 2014 - 4:22pm Addthis Celebrating Asian American Pacific Islander Heritage Month at the Energy Department Each May we celebrate Asian American and Pacific Islander Heritage Month, honoring the accomplishments of Asian Americans, Native Hawaiians, and Pacific Islanders at the Energy

  10. Pacific Gas and Electric Company Presentation by Steve Metague

    Energy Savers [EERE]

    Verenium Biofuels Fact Sheet Pacific Ethanol, Inc Verenium Pilot- and Demonstration-Scale Biorefinery

    Flambeau_River_Biofuels.pdf Flambeau River Biofuels Demonstration-Scale Biorefinery Major DOE Biofuels Project Locations

    Major DOE Biofuels Project Locations Pacific Ethanol, Inc Pacific Ethanol, Inc

    RSE Pulp & Chemical, LLC (Subsidiary of Red Shield Environmental, LLC)

    Pacific Ethanol, Inc

    Metague Sr. Director, Project Development Pacific Gas & Electric

  11. 1993 Pacific Northwest Loads and Resources Study.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1993-12-01

    The Loads and Resources Study is presented in three documents: (1) this summary of Federal system and Pacific Northwest region loads and resources; (2) a technical appendix detailing forecasted Pacific Northwest economic trends and loads, and (3) a technical appendix detailing the loads and resources for each major Pacific Northwest generating utility. In this loads and resources study, resource availability is compared with a range of forecasted electricity consumption. The forecasted future electricity demands -- firm loads -- are subtracted from the projected capability of existing and {open_quotes}contracted for{close_quotes} resources to determine whether Bonneville Power Administration (BPA) and the region will be surplus or deficit. If resources are greater than loads in any particular year or month, there is a surplus of energy and/or capacity, which BPA can sell to increase revenues. Conversely, if firm loads exceed available resources, there is a deficit of energy and/or capacity, and additional conservation, contract purchases, or generating resources will be needed to meet load growth. The Pacific Northwest Loads and Resources Study analyzes the Pacific Northwest`s projected loads and available generating resources in two parts: (1) the loads and resources of the Federal system, for which BPA is the marketing agency; and (2) the larger Pacific Northwest regional power system, which includes loads and resource in addition to the Federal system. The loads and resources analysis in this study simulates the operation of the power system under the Pacific Northwest Coordination Agreement (PNCA) produced by the Pacific Northwest Coordinating Group. This study presents the Federal system and regional analyses for five load forecasts: high, medium-high, medium, medium-low, and low. This analysis projects the yearly average energy consumption and resource availability for Operating Years (OY) 1994--95 through 2003--04.

  12. 1997 Pacific Northwest Loads and Resources Study.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1997-12-01

    The 1997 White Book is presented in two documents: (1) this summary of Federal system and Pacific Northwest region loads and resources; and (2) a technical appendix detailing the loads and resources for each major Pacific Northwest generating utility. Data detailing Pacific Northwest non-utility generating (NUG) resources is also available upon request. This analysis updates the 1996 pacific Northwest Loads and Resources Study, published in December 1996. In this loads and resources study, resource availability is compared with a medium forecast of electricity consumption. This document analyzes the Pacific Northwest`s projected loads and available generating resources in two parts: (1) the loads and resources of the Federal system, for which BPA is the marketing agency; and (2) the larger Pacific Northwest regional power system which includes loads and resources in addition to the Federal system. This study presents the Federal system and regional analyses for the medium load forecast. This analysis projects the yearly average energy consumption and resource availability for Operating Years (OY) 1998--99 through 2007--08.

  13. Evaluation of contaminant flux rates from sediments of Sinclair Inlet, WA, using a benthic flux sampling device. Final report

    SciTech Connect (OSTI)

    Chadwick, D.B.; Lieberman, S.H.; Reimers, C.E.; Young, D.

    1993-02-01

    A Benthic Flux Sampling Device (BFSD) was demonstrated on site to determine the mobility of contaminants in sediments off the Puget Sound Naval Shipyard (PSNS) in Sinclair Inlet, WA. Quantification of toxicant flux from the sediments will support ongoing assessment studies and facilitate the design of appropriate remediation strategies, if required. In general, where release of contaminants was found, the measured rates do not represent a significant source relative to other major inputs such as sewer discharges, nonpoint source runoff, and marinas. They may, however, represent an exposure pathway for benthic biota with a subsequent potential for toxicological effects and/or bioaccumulation. Environmental assessment, CIVAPP:Toxicity, CIVAPP:Marine chemistry, Hazardous waste.

  14. DOE Issues Request for Information for Richland Operations Office Richland

    Energy Savers [EERE]

    Guidance for "Other Transactions" DOE Issues Guidance for "Other Transactions" November 15, 2005 - 12:42pm Addthis Provides Opportunity for Increased Industry Research Partnerships WASHINGTON, DC - On November 7, 2005, the Department of Energy (DOE) issued an interim final rule for the establishment of policies and procedures for a new "other transaction" authority. This authority allows DOE to remove barriers to commercial firms' participation in some of DOE's

  15. Richland Operations Office - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (RL), the main field office for the Hanford Site in southeastern Washington State. I hope these pages will be informative for you about our mission, goals, and progress toward...

  16. Environmental Assessment and Finding of No Significant Impact: Widening Trench 36 of the 218-E-12B Low-Level Burial Ground, Hanford Site, Richland, Washington

    SciTech Connect (OSTI)

    N /A

    1999-02-11

    This environmental assessment was prepared to assess potential environmental impacts associated with the proposed action to widen and operate unused Trench 36 in the 218-E-12B Low-Level Burial Ground for disposal of low-level waste. Information contained herein will be used by the Manager, U.S. Department of Energy, Richland Operations Office, to determine if the Proposed Action is a major federal action significantly affecting the quality of the human environment. If the Proposed Action is determined to be major and significant, an environmental impact statement will be prepared. If the Proposed Action is determined not to be major and significant, a Finding of No Significant Impact will be issued and the action may proceed. Criteria used to evaluate significance can be found in Title 40, Code of Federal Regulations 1508.27. This environmental assessment was prepared in compliance with the ''National Environmental Policy Act of1969'', as amended, the Council on Environmental Quality Regulations for Implementing the Procedural Provisions of ''National Environmental Policy Act'' (Title 40, Code of Federal Regulations 1500-1508), and the U.S. Department of Energy Implementing Procedures for ''National Environmental Polio Act'' (Title 10, Code of Federal Regulations 1021). The following is a description of each section of this environmental assessment. (1) Purpose and Need for Action. This section provides a brief statement concerning the problem or opportunity the U.S, Department of Energy is addressing with the Proposed Action. Background information is provided. (2) Description of the Proposed Action. This section provides a description of the Proposed Action with sufficient detail to identify potential environmental impacts. (3) Alternatives to the Proposed Action. This section describes reasonable,alternative actions to the Proposed Action, which addresses the Purpose and Need. A No Action Alternative, as required by Title 10, Code of Federal Regulations 1021, also is described. (4) Affected Environment. This section provides a brief description of the locale in which the Proposed Action would take place. (5) Environmental Impacts. This section describes the range of environmental impacts, beneficial and adverse, of the Proposed Action. Impacts of alternatives briefly are discussed. (6) Permits and Regulatory Requirements. This section provides a brief description of permits and regulatory requirements for the Proposed Action. (7) Organizations Consulted. This section lists any outside groups, agencies, or individuals contacted as part of the environmental assessment preparation and/or review. (8) References. This section provides a list of documents used to contribute information or data in preparation of this environmental assessment.

  17. Xingmei Pacific Investment Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    Xingmei Pacific Investment Co Ltd Jump to: navigation, search Name: Xingmei Pacific Investment Co Ltd Place: China Product: Have invested USD200m to develop a 1m-tonne biodiesel...

  18. Asian American and Pacific Islander Heritage Month Program

    Broader source: Energy.gov [DOE]

    Asian Pacific American Heritage Month is a celebration of the culture, traditions, and history of Asian Americans and Pacific Islanders in the United States. Join the Energy Department for the...

  19. Application of evolved gas analysis to cold-cap reactions of melter feeds for nuclear waste vitrification

    Office of Scientific and Technical Information (OSTI)

    Thermochimica Acta 592 (2014) 86-92 Contents lists available at ScienceDirect Thermochimica Acta journal homepage www.elsevier.com/locate/tca Application of evolved gas analysis to cold-cap reactions of melter feeds for nuclear waste vitrification Carmen P. Rodrigueza, Jaehun Chun3'*, Michael J. Schweigera, Albert A. Krugerb, Pavel Hrma a,c a Pacific Northwest National Laboratory, 902 Battelle Blvd., P.O. Box 999, MSIN K6-24, Richland,WA 99352, USA b U.S. Department of Energy Office of River

  20. Microsoft PowerPoint - ACposter_final2.ppt

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cialella 1 , R. Wagener 1 , R. Jundt 2 , and C. Bates 2 1 Brookhaven National Laboratory, Upton, NY 2 Pacific Northwest Laboratory, Richland, WA Give it a try... http://www.arm.gov/sites (Best viewed in Firefox) Comments and suggestions welcomed (cialella@bnl.gov) KEY FEATURES FUTURE WORK Continue adding Instrument maps for each ACRF facility Add next China AMF site Add aerial photos for each site, when/if available Ultimately link all site maps through the ARM Google Maps site

  1. LWR NUCLEAR FUEL BUNDLE DATA FOR USE IN FUEL BUNDLE HANDLING

    Office of Scientific and Technical Information (OSTI)

    LWR NUCLEAR FUEL BUNDLE DATA FOR USE IN FUEL BUNDLE HANDLING TOPICAL REPORT W. 8. Weihermilfer C. S. Allison Septem bet 1979 Work Performed, Under Contract EY-76-C- M - 1 8 3 0 Form 189 Number 210.1 BAlTELLE PACIFIC NORTHWEST LABORATORY RICHLAND, WA 99352 BASE TECHNOLOGY N O T I C E T h i s report was prepard n an account of work sponrored by the UAed States Govcmmenr. Neither tht Unltcd S t a t e nor !he k p n m c n t of Energy, not any of their ernploylecs, nw any of theb ccmtnctotr,

  2. August 27, 2008

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FOIA Request Page 1 Freedom of Information Act (FOIA) Request Heart of America Northwest, Heart of America Northwest Research Center 1314 NE 56 th St. #100 Seattle, WA 98105 (206)382-1014 office@hoanw.org June 25, 2012 Dorothy Riehle RL/ORP Freedom of Information and Privacy Act Officer US Department of Energy P.O. Box 550 Richland, Washington 99352 Email: dorothy.riehle@rl.gov Pacific Northwest National Lab (PNNL) FOIA Officer FOIA/Privacy Act Officer US Department of Energy P.O. Box 2001 Oak

  3. Asia-Pacific Partnerships and Projects | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Asia-Pacific Partnerships and Projects Asia-Pacific Partnerships and Projects The Office of Energy Efficiency and Renewable Energy (EERE) engages in the Asia-Pacific region through regional partnerships, as well as bilaterally with individual countries. In addition to the deployment-focused partnerships described below, EERE Technology Offices engage in bilateral research partnerships with countries in the Asia-Pacific region, including Australia, China, India, Japan, and Korea. China research

  4. 2013 Annual Planning Summary for the Pacific Northwest Site Office |

    Energy Savers [EERE]

    Department of Energy Pacific Northwest Site Office 2013 Annual Planning Summary for the Pacific Northwest Site Office The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2013 and 2014 within the Pacific Northwest Site Office. The Pacific Northwest Site Office's APS was consolidated within the Office of Science's APS available here. More Documents & Publications 2013 Annual Planning Summary for the Thomas Jefferson Site Office 2013 Annual Planning

  5. A Presidential Proclamation - Asian American and Pacific Islander Heritage

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Month | Department of Energy A Presidential Proclamation - Asian American and Pacific Islander Heritage Month A Presidential Proclamation - Asian American and Pacific Islander Heritage Month May 1, 2013 - 9:25am Addthis A Presidential Proclamation - Asian American and Pacific Islander Heritage Month BY THE PRESIDENT OF THE UNITED STATES OF AMERICA A PROCLAMATION Each May, our Nation comes together to recount the ways Asian Americans and Pacific Islanders (AAPIs) helped forge our country. We

  6. PIA - NGP Fellow Application System PIA, Pacific Northwest National

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Laboratory | Department of Energy NGP Fellow Application System PIA, Pacific Northwest National Laboratory PIA - NGP Fellow Application System PIA, Pacific Northwest National Laboratory PIA NGP Fellow Application System PIA, Pacific Northwest National Laboratory PDF icon PIA - NGP Fellow Application System PIA, Pacific Northwest National Laboratory More Documents & Publications PIA - WEB iPASS System DOE PIA Occupational Medical Surveillance System (OMSS) PIA, Idaho National Laboratory

  7. Preliminary Notice of Violation, Pacific Data Electric, Inc. - February 12,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2015 | Department of Energy Pacific Data Electric, Inc. - February 12, 2015 Preliminary Notice of Violation, Pacific Data Electric, Inc. - February 12, 2015 February 12, 2015 Worker Safety and Health Enforcement Preliminary Notice of Violation issued to Pacific Data Electric, Inc. On February 12, 2015, the U.S. Department of Energy (DOE) Office of Enterprise Assessments' Office of Enforcement issued a Preliminary Notice of Violation (WEA-2015-02) to Pacific Data Electric, Inc. (PDE) for

  8. Pacific Power - Energy FinAnswer | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Name Utility Administrator Pacific Power Website http:www.pacificpower.netbusseepiwashingtonnfmref.html State Washington Program Type Rebate Program Rebate Amount...

  9. 2012 Annual Planning Summary for Pacific Northwest Site Office

    Broader source: Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within Pacific Northwest Site Office.

  10. Response of Juvenile Pacific Lamprey to Turbine Passage

    SciTech Connect (OSTI)

    Dauble, D.

    2009-09-14

    To help determine the Pacific lamprey’s ability to survive turbine passage, Pacific Northwest National Laboratory scientists conducted laboratory tests designed to simulate a fish’s passage through the turbine environment. Juvenile Pacific lamprey were subjected to two of three aspects of passage: pressure drop and shear stress. The third aspect, blade strike, was not tested.

  11. EA-1958: Finding of No Significant Impact

    Broader source: Energy.gov [DOE]

    Future Development in Proximity to the William R. Wiley Environmental Molecular Sciences Laboratory, Pacific Northwest National Laboratory, Richland, Washington

  12. Hanford Site Environmental Report for Calendar Year 1998

    SciTech Connect (OSTI)

    Dirkes, Roger L.; Hanf, Robert W.; Poston, Ted M.

    1999-01-01

    National technical Information Service, Springfield, Virginia. "Exteranl Radiation Surveillance, Section 4.7" Pacific Northwest National Laboratory, richland, Washington.

  13. Kami Lowry- Biography

    Broader source: Energy.gov [DOE]

    Kami Lowry is the Integrated Environmental Safety & Health Program Manager at the Pacific Northwest National Laboratory (PNNL) in Richland, Washington.

  14. Asian American and Pacific Islander Heritage Month

    Broader source: Energy.gov [DOE]

    A celebration of Asians and Pacific Islanders in the United States. The month of May was chosen to commemorate the immigration of the first Japanese to the United States on May 7, 1843, and to mark the anniversary of the completion of the transcontinental railroad on May 10, 1869. The majority of the workers who laid the tracks were Chinese immigrants.

  15. Wa s h i n g t o n U n i v e r s i t y i n S t . L o...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Wa s h i n g t o n U n i v e r s i t y i n S t . L o u i s - - P A R C ' s H o s t & A d mi n s t r a t i v e H o me - B o b B l a n k e n s h i p , P A R C D i r e c t o r - D e ...

  16. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 Subject: PW-1/3/6 & CW-5 Operable Units Adopted: June 3, 2011 Page 1 June 3, 2011 Scott Samuelson, Manager U.S. Department of Energy, Office of River Protection P.O. Box 450 (H6-60) Richland, WA 99352 Matt McCormick, Manager U.S. Department of Energy, Richland Operations P.O. Box 550 (A7-50) Richland, WA 99352 Dennis Faulk, Manager U.S. Environmental Protection Agency, Region 10 309 Bradley Blvd, Suite 115 Richland WA 99352 Re: PW-1/3/6 and CW-5 Operable Units Dear Messrs. Samuelson,

  17. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 Subject: 100-K Proposed Plan (Draft A) Adopted: February 10, 2012 Page 1 February 10, 2012 Matt McCormick, Manager U.S. Department of Energy, Richland Operations P.O. Box 550 (A7-50) Richland, WA 99352 Dennis Faulk, Manager U.S. Environmental Protection Agency, Region 10 309 Bradley Blvd,, Suite 115 Richland WA 99352 Jane Hedges, Program Manager Washington State Department of Ecology 3100 Port of Benton Blvd. Richland, WA 99354 Re: 100-K Proposed Plan (Draft A) Dear Messrs. McCormick, Faulk

  18. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    61 Subject: 2013 State of the Site Meetings Adopted: September 7, 2012 Page 1 September 7, 2012 Scott Samuelson, Manager U.S. Department of Energy, Office of River Protection P.O. Box 450 (H6-60) Richland, WA 99352 Matt McCormick, Manager U.S. Department of Energy, Richland Operations P.O. Box 550 (A7-50) Richland, WA 99352 Dennis Faulk, Manager U.S. Environmental Protection Agency, Region 10 309 Bradley Blvd,, Suite 115 Richland WA 99352 Jane Hedges, Program Manager Washington State Department

  19. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 Subject: TPA Change Package Adopted: February 8, 2013 Page 1 February 8, 2013 Kevin Smith, Manager U.S. Department of Energy, Office of River Protection P.O. Box 450 (H6-60) Richland, WA 99352 Matt McCormick, Manager U.S. Department of Energy, Richland Operations P.O. Box 550 (A7-50) Richland, WA 99352 Dennis Faulk, Manager U.S. Environmental Protection Agency, Region 10 309 Bradley Blvd,, Suite 115 Richland WA 99352 Jane Hedges, Program Manager Washington State Department of Ecology 3100 Port

  20. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 Subject:100 N Proposed Plan, Draft A Adopted: March 7, 2014 Page 1 March 7, 2014 Matt McCormick, Manager U.S. Department of Energy, Richland Operations P.O. Box 550 (A7-76) Richland, WA 99352 Kevin Smith, Manager U.S. Department of Energy, Office of River Protection P.O. Box 450 (H6-60) Richland, WA 99352 Dennis Faulk, Manager U.S. Environmental Protection Agency, Region 10 309 Bradley Blvd., Suite 115 Richland WA 99352 Jane Hedges, Manager Washington State Department of Ecology 3100 Port of

  1. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 Subject: 2014 Lifecycle Scope, Schedule & Cost Report Adopted: June 5, 2014 Page 1 June 5, 2014 Doug Shoop, Acting Manager U.S. Department of Energy, Richland Operations P.O. Box 550 (A7-75) Richland, WA 99352 Kevin Smith, Manager U.S. Department of Energy, Office of River Protection P.O. Box 450 (H6-60) Richland, WA 99352 Dennis Faulk, Manager U.S. Environmental Protection Agency, Region 10 309 Bradley Blvd., Suite 115 Richland, WA 99352 Jane Hedges, Manager Washington State Department of

  2. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 Subject: 100 D/H RI/FS, Draft A Adopted: June 5, 2014 Page 1 June 5, 2014 Doug Shoop, Acting Manager U.S. Department of Energy, Richland Operations P.O. Box 550 (A7-75) Richland, WA 99352 Dennis Faulk, Manager U.S. Environmental Protection Agency, Region 10 309 Bradley Blvd., Suite 115 Richland, WA 99352 Jane Hedges, Manager Washington State Department of Ecology 3100 Port of Benton Blvd. Richland, WA 99354 Re: 100 D/H RI/FS, Draft A Dear Messrs. Shoop, Faulk and Ms. Hedges, Background A

  3. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    HAB Consensus Advice # 283 Subject: Central Plateau Inner Area Guidelines Adopted: April 9, 2015 Page 1 April 9, 2015 Stacy Charboneau, Manager U.S. Department of Energy, Richland Operations Office P.O. Box 550 (A7-75) Richland, WA 99352 Kevin Smith, Manager U.S. Department of Energy, Office of River Protection P.O. Box 450 (H6-60) Richland, WA 99352 Dennis Faulk, Manager U.S. Environmental Protection Agency, Region 10 825 Jadwin Ave., Suite 210 Richland, WA 99352 Jane Hedges, Manager

  4. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    HAB Consensus Advice # 284 Subject: FY2016 & FY2017 Budget Priorities Adopted: June 11, 2015 Page 1 June 11, 2015 Stacy Charboneau, Manager U.S. Department of Energy, Richland Operations Office P.O. Box 550 (A7-75) Richland, WA 99352 Kevin Smith, Manager U.S. Department of Energy, Office of River Protection P.O. Box 450 (H6-60) Richland, WA 99352 Dennis Faulk, Manager U.S. Environmental Protection Agency, Region 10 825 Jadwin Ave., Suite 210 (A1-43) Richland, WA 99352 Jane Hedges, Manager

  5. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fax: (509) 942-1926 Hanford Advisory Board Subject: TPA Milestones & Program/Budget Restraints February 20, 2014 2014O-02 Page 1 February 19, 2014 Kevin Smith, Manager U.S. Department of Energy, Office of River Protection P.O. Box 450 (H6-60) Richland, WA 99352 Matt McCormick, Manager U.S. Department Of Energy, Richland Operations P.O. Box 550 (A7-50) Richland, WA 99352 Dennis Faulk, Manager U.S. Environmental Protection Agency, Region 10 309 Bradley Blvd. Suite 115 Richland, WA 99352 Jane

  6. Pacific Lamprey Research and Restoration : Annual Report 1997.

    SciTech Connect (OSTI)

    Jackson, Aaron D.; Hatch, Douglas R.; Close, David A.

    1998-08-05

    The once abundant stocks of Pacific lamprey (Lampetra tridentata) above Bonneville Dam are currently depressed (Close et al. 1995). It is likely that many of the same factors that led to the decline of wild stocks of Columbia River Pacific salmon and steelhead have impacted Pacific lamprey populations as well. The Pacific Lamprey Research and Restoration Project, funded by Bonneville Power Administration, is a cooperative effort between the Confederated Tribes of the Umatilla Indian Reservation, the Columbia River Inter-Tribal Fish Commission, and Oregon State University with the goal to increase Pacific lamprey stocks above Bonneville Dam.

  7. 1999 Pacific Northwest Loads and Resources Study.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1999-12-01

    The Pacific Northwest Loads and Resources Study (White Book) is published annually by BPA and establishes the planning basis for supplying electricity to customers. It serves a dual purpose. First, the White Book presents projections of regional and Federal system load and resource capabilities, along with relevant definitions and explanations. Second, the White Book serves as a benchmark for annual BPA determinations made pursuant to its regional power sales contracts. Specifically, BPA uses the information in the White Book for determining the notice required when customers request to increase or decrease the amount of power purchased from BPA. The White Book will not be used in calculations for the 2002 regional power sales contract subscription process. The White Book compiles information obtained from several formalized resource planning reports and data submittals, including those from the Northwest Power Planning Council (Council) and the Pacific Northwest Utilities Conference Committee (PNUCC). The White Book is not an operational planning guide, nor is it used for determining BPA revenues. Operation of the Federal Columbia River Power System (FCRPS) is based on a set of criteria different from that used for resource planning decisions. Operational planning is dependent upon real-time or near-term knowledge of system conditions, including expectations of river flows and runoff, market opportunities, availability of reservoir storage, energy exchanges, and other factors affecting the dynamics of operating a power system. In this loads and resources study, resource availability is compared with a medium forecast of electricity consumption. The forecasted future electricity demands--firm loads--are subtracted from the projected capability of existing and ''contracted for'' resources to determine whether BPA and the region will be surplus or deficit. If Federal system resources are greater than loads in any particular year or month, there is a surplus of energy and/or capacity, which BPA may use or market to increase revenues. Conversely, if Federal system firm loads exceed available resources, there is a deficit of energy and/or capacity and BPA would add conservation or contract purchases as needed to meet its firm loads. The load forecast is derived by using econometric models and analysis to predict the loads that will be placed on electric utilities in the region. This study incorporates information on contract obligations and contract resources, combined with the resource capabilities obtained from public utility and investor-owned utility (IOU) customers through their annual data submittals to the PNUCC, from BPA's Firm Resource Exhibit (FRE Exhibit I) submittals, and through analysis of the Federal hydroelectric power system. The loads and resources analysis in this study simulates the operation of the power system under the Pacific Northwest Coordination Agreement (PNCA) produced by the Pacific Northwest Coordinating Group. The PNCA defines the planning and operation of the regional hydrosystem. The 1999 White Book is presented in two documents: (1) this summary of Federal system and Pacific Northwest region loads and resources; and (2) a technical appendix (available electronically only) detailing the loads and resources for each major Pacific Northwest generating utility. This analysis updates the December 1998 Pacific Northwest Loads and Resources Study. This analysis projects the yearly average energy consumption and resource availability for Operating Years (OY) 2000-01 through 2009-10. The study shows the Federal system's and the region's monthly estimated maximum electricity demand, monthly energy demand, monthly energy generation, and monthly maximum generating capability--capacity--for OY 2000-01, 2004-05, and 2009-10. The Federal system and regional monthly capacity surplus/deficit projections are summarized for 10 operating years. This document analyzes the Pacific Northwest's projected loads and available generating resources in two parts: (1) the loads and resources of the Federal system, for which BPA is the marketing agency; and (2) the larger Pacific Northwest regional power system, which includes loads and resources in addition to the Federal system.

  8. app_d

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 DOE/EIS-0287 Idaho HLW & FD EIS - New Information - Document 52, Hanford Advisory Board (Merilyn Reeves), Richland, WA Page 1 of 3 Document 52, Hanford Advisory Board (Merilyn Reeves), Richland, WA Page 2 of 3 DOE/EIS-0287 D-124 Appendix D - New Information - Document 52, Hanford Advisory Board (Merilyn Reeves), Richland, WA Page 3 of 3 Document 53, Public Comment Hearing, February 24, 2000, Pasco, WA Page 1 of 6 D-125 DOE/EIS-0287 Idaho HLW & FD EIS - New Information - Document 53,

  9. DRAFT ADVICE - UNACCEPTABLE PROGRAM IMPACTS UNDER FY 97 BUDGET

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7, 2001 Keith Klein, Manager U.S. Department of Energy, Richland Operations P.O. Box 550 (A7-50) Richland, WA 99352 Harry Boston, Manager U.S. Department of Energy, Office of River Protection 2440 Stevens Richland, WA 99352 Chuck Findley, Acting Regional Administrator U.S. Environmental Protection Agency, Region 10 1200 Sixth Avenue Seattle, WA 98101 Tom Fitzsimmons, Director Washington Department of Ecology P.O. Box 47600 Olympia, WA 98504-7600 Re: Community Relations Plan Dear Messrs. Klein,

  10. HABadv-121.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 Subject: Principles for New and Existing Hanford Cleanup Contracts Adopted: June 8, 2001 Page 1 June 8, 2001 Keith Klein, Manager Department of Energy, Richland Operations P.O. 550 (A7-50) Richland, WA 99352 Harry Boston, Manager Department of Energy, Office of River Protection 2440 Stevens Richland, WA 99352 Re: Principles for New and Existing Hanford Cleanup Contracts The Hanford Advisory Board (HAB) has provided many pieces of advice in the past regarding contracts. The following not only

  11. HABavd #134 ISMS.PDF

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 Subject: Maintaining and Improving Hanford's Integrated Safety Management System (ISMS) Adopted: July 11, 02 Page 1 July 11, 2002 Roy Schepens, Manager U.S. Department of Energy, Office of River Protection P.O. Box 450 Richland, WA 99352 Keith Klein, Manager U.S. Department of Energy, Richland Operations P.O. Box 550 (A7-50) Richland, WA 99352 Re: Maintaining and Improving Hanford's Integrated Safety Management System (ISMS) Dear Messrs. Schepens and Klein, Assistant Secretary Roberson

  12. Pacific Northwest Storms Situation Report # 1

    SciTech Connect (OSTI)

    2006-12-15

    Severe wind and snow storms hit the Pacific Northwest region on December 14 – 15, 2006, following severe flooding during the past few days. The severe weather resulted in major power outages through the region. At peak there were 1.8 million customers without power which included BC Hydro in Canada. Currently, there are over 1.5 million outages in the region as a result of the Pacific Northwest Storms. This represents about 42 percent of customers in affected utility service areas in Oregon and Washington. See table below. Because the current wind and snow storms are coming on the heels of extensive flooding in the region, electric utilities are experiencing damage. Wind gusts reached close to 100 mph in some areas of the region. The storm is expected to bring its strong winds and heavy snow into Idaho, Montana and Wyoming Friday and into the weekend. There are currently no reported major impacts to the petroleum and natural gas infrastructure.

  13. 1996 Pacific Northwest Loads and Resources Study.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1996-12-01

    The Pacific Northwest Loads and Resources Study (White Book) is published annually by BPA and establishes the planning basis for supplying electricity to customers. It serves a dual purpose. First, the White Book presents projections of regional and Federal system load and resource capabilities, along with relevant definitions and explanations. Second, the White Book serves as a benchmark for annual BPA determinations made pursuant to the 1981 regional power sales contracts. Specifically, BPA uses the information in the White Book for determining the notice required when customers request to increase or decrease the amount of power purchased from BPA. Aside from these purposes, the White Book is used for input to BPA`s resource planning process. The White Book compiles information obtained from several formalized resource planning reports and data submittals, including those from the Northwest Power Planning Council (Council) and the Pacific Northwest Utilities Conference Committee (PNUCC). 11 figs., 12 tabs.

  14. Assistance Focus: Asia/Pacific Region (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2015-01-01

    The Clean Energy Solutions Center Ask an Expert service connects governments seeking policy information and advice with one of more than 30 global policy experts who can provide reliable and unbiased quick-response advice and information. The service is available at no cost to government agency representatives from any country and the technical institutes assisting them. This publication presents summaries of assistance provided to governments in the Asia/Pacific region, including the benefits of that assistance.

  15. Pacific Northwest Storms Situation Report # 5

    SciTech Connect (OSTI)

    none,

    2006-12-19

    Significant progress has been made in restoring power to customers in the Pacific Northwest region. Currently, 186,627 customers remain without power. The majority of customers without power are served by Puget Sound Energy. This is down from 1.8 million customers who lost power following severe wind and snow storms on December 14-15, 2006. The customers without power represent about 6 percent of customers in the affected utility service areas of Oregon and Washington. See table below.

  16. Pacific Northwest Storms Situation Report # 4

    SciTech Connect (OSTI)

    none,

    2006-12-18

    Significant progress has been made in restoring power to customers in the Pacific Northwest region. Currently, 237,030 customers remain without power. This is down from 1.8 million customers who lost power following severe wind and snow storms on December 14-15, 2006. The customers without power represent about 8 percent of customers in the affected utility service areas of Oregon and Washington.

  17. Central Equatorial Pacific Experiment (CEPEX). Design document

    SciTech Connect (OSTI)

    Not Available

    1993-04-01

    The Earth`s climate has varied significantly in the past, yet climate records reveal that in the tropics, sea surface temperatures seem to have been remarkably stable, varying by less than a few degrees Celsius over geologic time. Today, the large warm pool of the western Pacific shows similar characteristics. Its surface temperature always exceeds 27{degree}C, but never 31{degree}C. Heightened interest in this observation has been stimulated by questions of global climate change and the exploration of stabilizing climate feedback processes. Efforts to understand the observed weak sensitivity of tropical sea surface temperatures to climate forcing has led to a number of competing ideas about the nature of this apparent thermostat. Although there remains disagreement on the processes that regulate tropical sea surface temperature, most agree that further progress in resolving these differences requires comprehensive field observations of three-dimensional water vapor concentrations, solar and infrared radiative fluxes, surface fluxes of heat and water vapor, and cloud microphysical properties. This document describes the Central Equatorial Pacific Experiment (CEPEX) plan to collect such observations over the central equatorial Pacific Ocean during March of 1993.

  18. Establishment of a Background Environmental Monitoring Station for the PNNL Campus

    SciTech Connect (OSTI)

    Fritz, Brad G.; Snyder, Sandra F.; Barnett, J. M.; Bisping, Lynn E.; Rishel, Jeremy P.

    2014-12-18

    The environmental surveillance of background levels of radionuclides and, in particular, the siting of a background environmental surveillance (monitoring) station are examined. Many published works identify and stress the need for background monitoring; however, little definitive and comprehensive information for siting a station exists. A definition of an ideal background monitoring location and the generic criteria recommended for use in establishing such a background monitoring location are proposed. There are seven primary (mandatory) criteria described with two additional, optional criteria. The criteria are applied to the Richland, Washington (WA), Pacific Northwest National Laboratory (PNNL) Campus, which currently uses background monitoring data from the nearby Hanford Site. Eleven potential background monitoring sites were identified, with one location in Benton City, WA found to meet all of the mandatory and optional criteria. It is expected that the new sampler will be installed and operating by the end of June, 2015.

  19. file://L:\DOE-hanford.gov\public\boards\hab\advice\advice36.htm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Washington, DC 20585 Chuck Clarke, Regional Administrator U.S. Environmental Protection Agency, Region 10 1200 Sixth Avenue Seattle, WA 98101 Mary Riveland, Director Washington Department of Ecology PO Box 47600 Olympia, WA 98504-7600 John Wagoner, Manager Department of Energy, Richland Operations PO Box 550 Richland, WA 99352 December 8, 1995 RE: Review of FY96 BEMR, MYPP and Site Level Assumptions (HAB Advice #36) Dear Messrs. Grumbly, Clarke and Wagoner, and Ms. Riveland: The FY96 BEMR, MYPP

  20. file://L:\DOE-hanford.gov\public\boards\hab\advice\advice67.htm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Chuck Clarke, Regional Administrator U.S. Environmental Protection Agency, Region 10 1200 Sixth Avenue Seattle, WA 98101 Tom Fitzsimmons, Director Washington Department of Ecology P.O. Box 47600 Olympia, WA 98504-7600 John Wagoner, Manager U.S. Department of Energy, Richland Operations P.O. Box 550 (A7-50) Richland, WA 99352 Subject: TWRS Vadose Zone Characterization Dear Messrs. Clarke, Fitzsimmons and Wagoner: Background In February 1996, new data were disclosed that contamination in the form

  1. Pacific Decadal Variability and Central Pacific Warming El Niño in a Changing Climate

    SciTech Connect (OSTI)

    Di Lorenzo, Emanuele

    2015-02-27

    This research aimed at understanding the dynamics controlling decadal variability in the Pacific Ocean and its interactions with global-scale climate change. The first goal was to assess how the dynamics and statistics of the El Niño Southern Oscillation and the modes of Pacific decadal variability are represented in global climate models used in the IPCC. The second goal was to quantify how decadal dynamics are projected to change under continued greenhouse forcing, and determine their significance in the context of paleo-proxy reconstruction of long-term climate.

  2. Workplace Charging Challenge Partner: Pacific Gas & Electric Company |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Pacific Gas & Electric Company Workplace Charging Challenge Partner: Pacific Gas & Electric Company Workplace Charging Challenge Partner: Pacific Gas & Electric Company Joined the Challenge: October 2014 i>Headquarters: San Francisco, CA Charging Locations: San Francisco, CA; San Ramon, CA ; Concord, CA Domestic Employees: 22,000 In keeping with its strong support for clean transportation, PG&E employees now have an opportunity to charge plug-in

  3. Pacific Lamprey Research and Restoration : Annual Report 1996.

    SciTech Connect (OSTI)

    Jackson, Aaron D.

    1997-01-01

    The once abundant stocks of Pacific lamprey (Lampetra tridentata) above Bonneville Dam are currently depressed (Close et al. 1995). It is likely that many of the same factors that led to the decline of wild stocks of Columbia River Pacific salmon and steelhead have impacted Pacific lamprey populations. The Pacific lamprey is an important part of the food web of North Pacific ecosystems, both as predator and prey. Lamprey (a.k.a. eels) are also a valuable food and culture resource for American Indian Tribes of the Pacific Northwest. Depressed Pacific lamprey runs have impacted treaty secured fishing opportunities by forcing tribal members to gather this traditional food in lower Columbia River locations. The Pacific Lamprey Research and Restoration Project, funded by Bonneville Power Administration, is a cooperative effort between the Confederated Tribes of The Umatilla Indian Reservation, the Columbia River Intertribal Fish Commission, and Oregon State University with the goal to increase Pacific lamprey stocks above Bonneville Dam. The initial objectives of the project are to determine the past and current abundance of Pacific lamprey stocks in major mid Columbia tributaries and at various hydroelectric facilities, and to determine factors limiting Pacific lamprey abundance and distribution. Ultimately, Pacific lamprey restoration plans will be developed and implemented. Part (A)-CTUIR: (1) determine past and present abundance and distribution in NE Oregon and SE Washington tributaries; and (2) determine limiting habitat factors. Part (B)-CRITFC: (1) adult abundance monitoring at Columbia and Snake River dams; (2) juvenile abundance monitoring at Columbia and Snake River dams; and (3) juvenile passage impediments and needed improvements at Columbia and Snake River dams. Part (C)- OSU: (1) adult passage impediments and needed improvements at Columbia and Snake River dams; and (2) juvenile passage impediments and needed improvements at Columbia and Snake River dams.

  4. Simulation of the intraseasonal variability over the Eastern Pacific ITCZ

    Office of Scientific and Technical Information (OSTI)

    in climate models (Journal Article) | SciTech Connect Simulation of the intraseasonal variability over the Eastern Pacific ITCZ in climate models Citation Details In-Document Search Title: Simulation of the intraseasonal variability over the Eastern Pacific ITCZ in climate models During boreal summer, convective activity over the eastern Pacific (EPAC) inter-tropical convergence zone (ITCZ) exhibits vigorous intraseasonal variability (ISV). Previous observational studies identified two

  5. Now Available: Pacific Northwest Smart Grid Demonstration Project -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technology Performance Report Volume 1 | Department of Energy Pacific Northwest Smart Grid Demonstration Project - Technology Performance Report Volume 1 Now Available: Pacific Northwest Smart Grid Demonstration Project - Technology Performance Report Volume 1 July 14, 2015 - 1:43pm Addthis The first volume of the technology performance report for the Pacific Northwest Smart Grid Demonstration, a $179 million project that was co-funded by DOE, is now available for downloading. One of 16

  6. Asian American and Pacific Islander Heritage Women @ Energy | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Asian American and Pacific Islander Heritage Women @ Energy Asian American and Pacific Islander Heritage Women @ Energy May 3, 2013 - 11:49am Addthis Xin Sun 1 of 12 Xin Sun Creativity, insight, and application are the hallmarks of Dr. Xin Sun's applied mechanics and computational materials research at Pacific Northwest National Laboratory. Her advances in lightweight and high-strength materials (including steels) and modeling are vital to energy efficiency and renewable energy and

  7. Federal Asian Pacific American Council - New Mexico Chapter Albuquerqu...

    National Nuclear Security Administration (NNSA)

    Asian Pacific American Council - New Mexico Chapter Albuquerque, NM | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the...

  8. PP-299 Sea Breeze Pacific Regional Transmission System Inc |...

    Broader source: Energy.gov (indexed) [DOE]

    More Documents & Publications PP-299-1 Sea Breeze Olympic Converter LP Application for Presidential Permit OE Docket No. PP-299 Sea Breeze Pacific Regional Transmission System, INC ...

  9. Pacific Fuel Cell Corp PFCE | Open Energy Information

    Open Energy Info (EERE)

    Fuel Cell Corp PFCE Jump to: navigation, search Name: Pacific Fuel Cell Corp (PFCE) Place: Tustin, California Zip: 92780 Sector: Carbon Product: Owns a license for a proprietary...

  10. Pacific Ethanol Inc formerly Accessity Corporation | Open Energy...

    Open Energy Info (EERE)

    Ethanol Inc formerly Accessity Corporation Jump to: navigation, search Name: Pacific Ethanol Inc (formerly Accessity Corporation) Place: Fresno, California Zip: 93711 Product:...

  11. Pacific Ethanol Inc the former | Open Energy Information

    Open Energy Info (EERE)

    Inc the former Jump to: navigation, search Name: Pacific Ethanol Inc (the former) Place: Fresno, California Zip: 93711 Product: California-based developer of bioethanol plants....

  12. Asia Pacific Energy Research Centre-IEA Cooperation | Open Energy...

    Open Energy Info (EERE)

    Energy Research Centre-IEA Cooperation AgencyCompany Organization Asia Pacific Energy Research Centre, International Energy Agency Sector Energy Focus Area Conventional Energy,...

  13. ,"Pacific Region Natural Gas Underground Storage Volume (MMcf...

    U.S. Energy Information Administration (EIA) Indexed Site

    Pacific Region Natural Gas Underground Storage Volume (MMcf)" ,"Click worksheet name or ...dnavnghistn5030912m.htm" ,"Source:","Energy Information Administration" ,"For Help, ...

  14. Independent Oversight Review, Pacific Northwest National Laboratory- October 2012

    Broader source: Energy.gov [DOE]

    Review of the Department of Energy Office of Science Assessment of the Pacific Northwest National Laboratory Radiochemical Processing Laboratory Criticality Alarm System

  15. Update on Mammoth Pacific, LP Operations | Open Energy Information

    Open Energy Info (EERE)

    Update on Mammoth Pacific, LP Operations Abstract Abstract unavailable. Author Charlene L. Wardlow Published Publisher Not Provided, 2011 DOI Not Provided Check for DOI...

  16. Energy Security and Sustainable Development in Asia and the Pacific...

    Open Energy Info (EERE)

    Statistics Division, UNDP, APERC, BP and IEA. For demand forecasts, it uses IEA methodology, albeit modified for Asia-Pacific conditions. The study uses the international...

  17. Energy Secretary Announces $52 Million Request for Asia Pacific...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for Asia Pacific Partnership on Clean Development and Climate Energy Secretary Announces 52 Million ... of Energy Advances Commercialization of Climate Change Technology ...

  18. 2014 Annual Planning Summary for the Pacific Northwest Site Office

    Broader source: Energy.gov [DOE]

    The Pacific Northwest National Laboratory has determined that no new EAs or EISs are expected to commence during the next 12 to 24-month period.

  19. Western Pacific; Gas line plans continue to increase

    SciTech Connect (OSTI)

    Quarles, W.R.; Thiede, K.; Parent, L.

    1990-11-01

    The authors report on pipeline activity in the Western Pacific. They discuss projects underway in Australia, Indonesia, Malaysia, New Zealand, Papua New Guinea, and Singapore.

  20. Voluntary Protection Program Review, Pacific Northwest National Laboratory- June 2009

    Broader source: Energy.gov [DOE]

    Evaluation to determine whether the Pacific Northwest National Laboratory is continuing to perform at a level deserving DOE-VPP Star recognition.