National Library of Energy BETA

Sample records for rfc pjm ac

  1. PJM Interconnection, LLC | Open Energy Information

    Open Energy Info (EERE)

    LLC Jump to: navigation, search Name: PJM Interconnection, LLC Place: Norristown, PA References: SGIC1 This article is a stub. You can help OpenEI by expanding it. PJM...

  2. rfc:the | NSAC Subcommittee 2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Theory Comments Please add your comments below. Newer comments are displayed nearer the top. You could leave a comment if you were logged in. rfc/the

  3. PJM Controller Testing with Prototypic PJM Nozzle Configuration

    SciTech Connect (OSTI)

    Bontha, Jagannadha R.; Nigl, Franz; Weier, Dennis R.; Leigh, Richard J.; Johnson, Eric D.; Wilcox, Wayne A.; Pfund, David M.; Baumann, Aaron W.; Wang, Yeefoo

    2009-08-21

    The U.S. Department of Energy (DOE) Office of River Protections Waste Treatment Plant (WTP) is being designed and built to pre-treat and then vitrify a large portion of the wastes in Hanfords 177 underground waste storage tanks. The WTP consists of three primary facilitiespretreatment, low-activity waste (LAW) vitrification, and high-level waste (HLW) vitrification. The pretreatment facility will receive waste piped from the Hanford tank farms and separate it into a high-volume, low-activity liquid stream stripped of most solids and radionuclides and a much smaller volume of HLW slurry containing most of the solids and most of the radioactivity. Many of the vessels in the pretreatment facility will contain pulse jet mixers (PJM) that will provide some or all of the mixing in the vessels. Pulse jet mixer technology was selected for use in black cell regions of the WTP, where maintenance cannot be performed once hot testing and operations commence. The PJMs have no moving mechanical parts that require maintenance. The vessels with the most concentrated slurries will also be mixed with air spargers and/or steady jets in addition to the mixing provided by the PJMs. Pulse jet mixers are susceptible to overblows that can generate large hydrodynamic forces, forces that can damage mixing vessels or their internal parts. The probability of an overblow increases if a PJM does not fill completely. The purpose of the testing performed for this report was to determine how reliable and repeatable the primary and safety (or backup) PJM control systems are at detecting drive overblows (DOB) and charge vessel full (CVF) conditions. Testing was performed on the ABB 800xA and Triconex control systems. The controllers operated an array of four PJMs installed in an approximately 13 ft diameter 15 ft tall tank located in the high bay of the Pacific Northwest National Laboratory (PNNL) 336 Building test facility. The PJMs were fitted with 4 inch diameter discharge nozzles representative of the nozzles to be used in the WTP. This work supplemented earlier controller tests done on PJMs with 2 inch nozzles (Bontha et al. 2007). Those earlier tests enabled the selection of appropriate pressure transmitters with associated piping and resulted in an alternate overblow detection algorithm that uses data from pressure transmitters mounted in a water flush line on the PJM airlines. Much of that earlier work was only qualitative, however, due to a data logger equipment failure that occurred during the 2007 testing. The objectives of the current work focused on providing quantitative determinations of the ability of the BNI controllers to detect DOB and CVF conditions. On both control systems, a DOB or CVF is indicated when the values of particular internal functions, called confidence values, cross predetermined thresholds. There are two types of confidence values; one based on a transformation of jet pump pair (JPP) drive and suction pressures, the other based on the pressure in the flush line. In the present testing, we collected confidence levels output from the ABB and Triconex controllers. These data were analyzed in terms of the true and noise confidence peaks generated during multiple cycles of DOB and CVF events. The distributions of peak and noise amplitudes were compared to see if thresholds could be set that would enable the detection of DOB and CVF events at high probabilities, while keeping false detections to low probabilities. Supporting data were also collected on PJM operation, including data on PJM pressures and levels, to provide direct experimental evidence of when PJMs were filling, full, driving, or overblowing.

  4. Property:EIA/861/RtoPjm | Open Energy Information

    Open Energy Info (EERE)

    RtoPjm Jump to: navigation, search Property Name RTOPJM Property Type Boolean Description Indicates that the organization conducts operations in the PJM RTO 1 References ...

  5. rfc:fac | NSAC Subcommittee 2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Facilities Comments Please add your comments below. Newer comments are displayed nearer the top. You could leave a comment if you were logged in. rfc/fac.txt * Last modified: 2012/05/18 16:14

  6. rfc:mep | NSAC Subcommittee 2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Medium Energy Physics Comments Please add your comments below. Newer comments are displayed nearer the top. You could leave a comment if you were logged in. rfc/mep

  7. rfc:rhi | NSAC Subcommittee 2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Relativistic Heavy Ion Physics Comments Please add your comments below. Newer comments are displayed nearer the top. You could leave a comment if you were logged in. rfc/rhi

  8. rfc:lep | NSAC Subcommittee 2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Low Energy Physics Comments Please add your comments below. Newer comments are displayed nearer the top. You could leave a comment if you were logged in. rfc/lep.txt * Last modified: 2012/05/19 14:29 CDT by hagel

  9. Property:EIA/861/NercRfc | Open Energy Information

    Open Energy Info (EERE)

    operations within the RFC region (Y or N) 1 References EIA Form EIA-861 Final Data File for 2008 - F861 File Layout-2008.doc Pages using the property "EIA861NercRfc"...

  10. Response from PJM Interconnection LLC and Pepco to Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Need for Potomac River Station Generation Response from PJM Interconnection LLC and Pepco to Department of Energy Request for Information Concerning the Potential Need for ...

  11. PJM Presentation- The Silver Bullet: Storage! (July 12, 2011)

    Broader source: Energy.gov [DOE]

    Presentation by Terry Boston, President and CEO pf PJM Interconnection before the Electricity Advisorty Committee, July 12, 2011, on storage for the smart grid.

  12. Pepco and PJM Interconnection Comments on District of Columbia...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDF icon Pepco and PJM Interconnection Comments on District of Columbia Public ... Operation at Mirant's Potomac River Generating Station and Proposed Mirant Compliance Plan ...

  13. Planning for environmental constraints on the PJM system

    SciTech Connect (OSTI)

    Not Available

    1994-07-15

    This chapter provides a snapshot of the existing PJM system and identifies the environmental constraints that form the parameters for the regional approaches analyzed in this study. The chapter begins with a description of the PJM system and the costs and emissions levels of the pollutants under study associated with the reference case (the PJM system configured to meet only Clean Air Act Amendment Phase I SO{sub 2} requirements and the March 1994 NO{sub x} requirements affecting Phase I units){sup 3}. Next, the pollution-reduction scenario assumed for the purpose of the study, which covers the period 1995--2010, is described. Finally, the impacts of this pollution reduction scenario -- emissions that would need to be avoided on the reference case PJM system -- are identified. Modeling methods are described alongside the study`s results. Other chapters discuss: environmental constraints, alternate plans to achieve environmental goals, and comparison of alternate plans.

  14. Joint Maintenance Status Report of Potomac Electric Power Company amd PJM

    Energy Savers [EERE]

    Interconnection, LLC | Department of Energy Joint Maintenance Status Report of Potomac Electric Power Company amd PJM Interconnection, LLC Joint Maintenance Status Report of Potomac Electric Power Company amd PJM Interconnection, LLC Docket No. EO-05-01: Potomac Electric Power Company ("Pepco") and PJM Interconnection, L.L.C. ("PJM") hereby jointly submit this Maintenance Report to advise you of the work completed and findings made during the maintenance outages for

  15. Pepco and PJM Interconnection Comments on District of Columbia Public

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Service Commission, Docket No. EO-05-01 Comments and Answer to Requests for Rehearing | Department of Energy Pepco and PJM Interconnection Comments on District of Columbia Public Service Commission, Docket No. EO-05-01 Comments and Answer to Requests for Rehearing Pepco and PJM Interconnection Comments on District of Columbia Public Service Commission, Docket No. EO-05-01 Comments and Answer to Requests for Rehearing Docket No. EO-05-01: In accordance with Order No. 202-06-1, issued by the

  16. Preliminary Response of PJM Interconnection, L.L.C. to the Operating Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Mirant Potomac River, LLC | Department of Energy Response of PJM Interconnection, L.L.C. to the Operating Plan of Mirant Potomac River, LLC Preliminary Response of PJM Interconnection, L.L.C. to the Operating Plan of Mirant Potomac River, LLC Docket No. EO-05-01. In summary, PJM understands the difficulty facing the Department in having to balance the important conflicting interests presented here. However, PJM does not regard Option A as anywhere close to striking the correct balance.

  17. Motion to Intervene and Initial Comments of PJM Interconnection, L.L.C. |

    Office of Environmental Management (EM)

    Department of Energy Initial Comments of PJM Interconnection, L.L.C. Motion to Intervene and Initial Comments of PJM Interconnection, L.L.C. Motion to Intervene and Initial Comments of PJM Interconnection, L.L.C. On January 5, 2009, ITC Transmission filed with the Department of Energy a request to amend Presidential Permit PP-230-3, which authorizes ITC to own and operate specified electric transmission facilities at the Bunce Creek station that interconnect ITC with Hydro One Networks Inc

  18. Response from PJM Interconnection LLC and Pepco to Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Request for Information Concerning the Potential Need for Potomac River Station Generation | Department of Energy PJM Interconnection LLC and Pepco to Department of Energy Request for Information Concerning the Potential Need for Potomac River Station Generation Response from PJM Interconnection LLC and Pepco to Department of Energy Request for Information Concerning the Potential Need for Potomac River Station Generation Docket No. EO-05-01: This letter will respond to your request for

  19. Commercial Building Loads Providing Ancillary Services in PJM

    SciTech Connect (OSTI)

    MacDonald, Jason; Kiliccote, Sila; Boch, Jim; Chen, Jonathan; Nawy, Robert

    2014-06-27

    The adoption of low carbon energy technologies such as variable renewable energy and electric vehicles, coupled with the efficacy of energy efficiency to reduce traditional base load has increased the uncertainty inherent in the net load shape. Handling this variability with slower, traditional resources leads to inefficient system dispatch, and in some cases may compromise reliability. Grid operators are looking to future energy technologies, such as automated demand response (DR), to provide capacity-based reliability services as the need for these services increase. While DR resources are expected to have the flexibility characteristics operators are looking for, demonstrations are necessary to build confidence in their capabilities. Additionally, building owners are uncertain of the monetary value and operational burden of providing these services. To address this, the present study demonstrates the ability of demand response resources providing two ancillary services in the PJM territory, synchronous reserve and regulation, using an OpenADR 2.0b signaling architecture. The loads under control include HVAC and lighting at a big box retail store and variable frequency fan loads. The study examines performance characteristics of the resource: the speed of response, communications latencies in the architecture, and accuracy of response. It also examines the frequency and duration of events and the value in the marketplace which can be used to examine if the opportunity is sufficient to entice building owners to participate.

  20. Response by PJM to letters from the City of Alexandria and the Virginia

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Environmental Quality pursuant to Order No. 202-05-03 | Department of Energy by PJM to letters from the City of Alexandria and the Virginia Department of Environmental Quality pursuant to Order No. 202-05-03 Response by PJM to letters from the City of Alexandria and the Virginia Department of Environmental Quality pursuant to Order No. 202-05-03 Docket No. EO-05-01: Following the release of the Department of Energy's Order No. 202-05-3 issued December 20, 2005 (the

  1. Where has Electricity Demand Growth Gon in PJM and What are the Implications?

    Gasoline and Diesel Fuel Update (EIA)

    4 Paul M. Sotkiewicz, Ph.D. Chief Economist PJM Interconnection Where has Electricity Demand Growth Gone in PJM and What are the Implications? 2014 EIA Energy Conference Panel on Implications of a Zero/Low Electricity Demand Growth Scenario July 14, 2014 Washington, DC PJM©2014 2 PJM©2014 3 Why is it Important to Understand the Reasons For Flat to Declining Load Growth? * The industry is facing an unprecedented turnover in generation capital stock - 26,000 MW of retirements since 2009 (nearly

  2. Answer of Potomac Electric Power Company and PJM lnterconnection, L.L.C. to

    Energy Savers [EERE]

    the October 6, 2005 motion filed by the Virginia Department of Environmental Quality | Department of Energy Answer of Potomac Electric Power Company and PJM lnterconnection, L.L.C. to the October 6, 2005 motion filed by the Virginia Department of Environmental Quality Answer of Potomac Electric Power Company and PJM lnterconnection, L.L.C. to the October 6, 2005 motion filed by the Virginia Department of Environmental Quality Docket No. EO-05-01: Pursuant to Rule 213 of the rules of Practice

  3. City of Sturgis, Michigan (Utility Company) | Open Energy Information

    Open Energy Info (EERE)

    Data Utility Id 18252 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes RTO PJM Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes...

  4. West Penn Power Co | Open Energy Information

    Open Energy Info (EERE)

    Data Utility Id 20387 Utility Location Yes Ownership I NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Transmission Yes Activity Distribution Yes Activity Wholesale...

  5. City of Orrville, Ohio (Utility Company) | Open Energy Information

    Open Energy Info (EERE)

    Data Utility Id 14194 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes RTO PJM Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes...

  6. Village of Winnetka, Illinois (Utility Company) | Open Energy...

    Open Energy Info (EERE)

    Data Utility Id 20824 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes RTO PJM Yes Operates Generating Plant Yes Activity Generation Yes Activity Distribution Yes...

  7. Pennsylvania Electric Co | Open Energy Information

    Open Energy Info (EERE)

    Data Utility Id 14711 Utility Location Yes Ownership I NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Transmission Yes Activity Buying Transmission Yes Activity...

  8. Ohio Power Co | Open Energy Information

    Open Energy Info (EERE)

    Data Utility Id 14006 Utility Location Yes Ownership I NERC Location RFC NERC RFC Yes RTO PJM Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes...

  9. PECO Energy Co | Open Energy Information

    Open Energy Info (EERE)

    Data Utility Id 14940 Utility Location Yes Ownership I NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Transmission Yes Activity Distribution Yes Activity Bundled Services...

  10. Potomac Electric Power Co | Open Energy Information

    Open Energy Info (EERE)

    Data Utility Id 15270 Utility Location Yes Ownership I NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Transmission Yes Activity Buying Transmission Yes Activity...

  11. Clyde Light & Power | Open Energy Information

    Open Energy Info (EERE)

    861 Data Utility Id 3824 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Transmission Yes Activity Buying Transmission Yes Activity...

  12. City of St Marys, Ohio (Utility Company) | Open Energy Information

    Open Energy Info (EERE)

    Data Utility Id 17891 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes RTO PJM Yes Operates Generating Plant Yes Activity Generation Yes Activity Buying...

  13. Town of Berlin, Maryland (Utility Company) | Open Energy Information

    Open Energy Info (EERE)

    861 Data Utility Id 1615 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes RTO PJM Yes Operates Generating Plant Yes Activity Generation Yes Activity Buying...

  14. An RFC 1179 Compatible Remote Print Server for Windows 3.1

    Energy Science and Technology Software Center (OSTI)

    1993-11-09

    Internet RFC 1179 describes the protocol to be used for printing files on a remote printer in a TCP/IP network. The protocol is client/server, meaning that the client initiates the print request, and the server receives the request and performs the actual printing locally. This protocol has been in long use on Unix systems derived from the Berkeley Software Distribution, such as DEC''s Ultrix and Sun''s SunOS. LPD Services implements the server portion of thismore » protocol. It handles both the network communication and conformance with the protocol, and printing using the Microsoft Windows device independent printing interface.« less

  15. City of Bedford, Virginia (Utility Company) | Open Energy Information

    Open Energy Info (EERE)

    861 Data Utility Id 1456 Utility Location Yes Ownership M NERC Location RFO NERC RFC Yes RTO PJM Yes Operates Generating Plant Yes Activity Generation Yes Activity Buying...

  16. Village of Plymouth, Ohio (Utility Company) | Open Energy Information

    Open Energy Info (EERE)

    Data Utility Id 15203 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Buying Transmission Yes Activity Distribution Yes This article is a...

  17. City of Columbiana, Ohio (Utility Company) | Open Energy Information

    Open Energy Info (EERE)

    861 Data Utility Id 4061 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Distribution Yes This article is a stub. You can help OpenEI by...

  18. Craig-Botetourt Electric Coop | Open Energy Information

    Open Energy Info (EERE)

    861 Data Utility Id 4471 Utility Location Yes Ownership C NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Distribution Yes This article is a stub. You can help OpenEI by...

  19. Borough of Olyphant, Pennsylvania (Utility Company) | Open Energy...

    Open Energy Info (EERE)

    Data Utility Id 14124 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Distribution Yes This article is a stub. You can help OpenEI by...

  20. South Central Power Company | Open Energy Information

    Open Energy Info (EERE)

    Data Utility Id 18085 Utility Location Yes Ownership C NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Distribution Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes This...

  1. Town of Avilla, Indiana (Utility Company) | Open Energy Information

    Open Energy Info (EERE)

    861 Data Utility Id 1028 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Distribution Yes Activity Bundled Services Yes This article is a stub....

  2. The Energy Coop | Open Energy Information

    Open Energy Info (EERE)

    Data Utility Id 49746 Utility Location Yes Ownership C NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Retail Marketing Yes This article is a stub. You can help OpenEI by...

  3. City of Dowagiac, Michigan (Utility Company) | Open Energy Information

    Open Energy Info (EERE)

    861 Data Utility Id 5343 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Bundled Services Yes This article is a stub. You can help OpenEI by...

  4. Village of Republic, Ohio (Utility Company) | Open Energy Information

    Open Energy Info (EERE)

    Data Utility Id 15865 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Buying Transmission Yes Activity Distribution Yes This article is a...

  5. Village of Versailles, Ohio (Utility Company) | Open Energy Informatio...

    Open Energy Info (EERE)

    Data Utility Id 19805 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Buying Transmission Yes Activity Distribution Yes This article is a...

  6. Borough of Kutztown, Pennsylvania (Utility Company) | Open Energy...

    Open Energy Info (EERE)

    Data Utility Id 10494 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Buying Transmission Yes Activity Distribution Yes This article is a...

  7. Wabash Valley Power Assn, Inc | Open Energy Information

    Open Energy Info (EERE)

    Utility Id 40211 Utility Location Yes Ownership C NERC Location RFC,SERC NERC RFC Yes RTO PJM Yes ISO MISO Yes Activity Generation Yes Activity Transmission Yes Activity Buying...

  8. Borough of South River, New Jersey (Utility Company) | Open Energy...

    Open Energy Info (EERE)

    Data Utility Id 17571 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Distribution Yes This article is a stub. You can help OpenEI by...

  9. Village of Sycamore, Ohio (Utility Company) | Open Energy Information

    Open Energy Info (EERE)

    Data Utility Id 18393 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Distribution Yes This article is a stub. You can help OpenEI by...

  10. Village of Bloomdale, Ohio (Utility Company) | Open Energy Information

    Open Energy Info (EERE)

    861 Data Utility Id 1677 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Buying Transmission Yes Activity Distribution Yes This article is a...

  11. Virginia Tech Electric Service | Open Energy Information

    Open Energy Info (EERE)

    Data Utility Id 19882 Utility Location Yes Ownership S NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Distribution Yes This article is a stub. You can help OpenEI by...

  12. City of Westerville, Ohio (Utility Company) | Open Energy Information

    Open Energy Info (EERE)

    Data Utility Id 20477 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Transmission Yes Activity Distribution Yes This article is a stub. You...

  13. Adams Rural Electric Coop, Inc | Open Energy Information

    Open Energy Info (EERE)

    861 Data Utility Id 118 Utility Location Yes Ownership C NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Distribution Yes This article is a stub. You can help OpenEI by...

  14. Allegheny Electric Coop Inc | Open Energy Information

    Open Energy Info (EERE)

    861 Data Utility Id 332 Utility Location Yes Ownership C NERC Location RFC NERC RFC Yes RTO PJM Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes...

  15. City of Garrett, Indiana (Utility Company) | Open Energy Information

    Open Energy Info (EERE)

    861 Data Utility Id 6970 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Distribution Yes This article is a stub. You can help OpenEI by...

  16. Paulding-Putman Elec Coop, Inc | Open Energy Information

    Open Energy Info (EERE)

    Data Utility Id 14599 Utility Location Yes Ownership C NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Distribution Yes This article is a stub. You can help OpenEI by...

  17. Firelands Electric Coop, Inc | Open Energy Information

    Open Energy Info (EERE)

    861 Data Utility Id 6335 Utility Location Yes Ownership C NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Distribution Yes This article is a stub. You can help OpenEI by...

  18. City of Seaford, Delaware (Utility Company) | Open Energy Information

    Open Energy Info (EERE)

    Data Utility Id 16852 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Distribution Yes This article is a stub. You can help OpenEI by...

  19. City of Niles, Michigan (Utility Company) | Open Energy Information

    Open Energy Info (EERE)

    Data Utility Id 13604 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Distribution Yes This article is a stub. You can help OpenEI by...

  20. United Electric Coop, Inc (Pennsylvania) | Open Energy Information

    Open Energy Info (EERE)

    Data Utility Id 40219 Utility Location Yes Ownership C NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Distribution Yes This article is a stub. You can help OpenEI by...

  1. South Jersey Energy Company | Open Energy Information

    Open Energy Info (EERE)

    Data Utility Id 17549 Utility Location Yes Ownership R NERC Location RFC NERC RFC Yes RTO PJM Yes ISO NE Yes Activity Retail Marketing Yes This article is a stub. You can help...

  2. Sussex Rural Electric Coop Inc | Open Energy Information

    Open Energy Info (EERE)

    Data Utility Id 40299 Utility Location Yes Ownership C NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Distribution Yes This article is a stub. You can help OpenEI by...

  3. PEPCO Energy Services | Open Energy Information

    Open Energy Info (EERE)

    Location Yes Ownership R NERC Location RFC NERC ERCOT Yes NERC RFC Yes ISO Ercot Yes RTO PJM Yes ISO NY Yes ISO NE Yes Activity Retail Marketing Yes Activity Bundled Services...

  4. Pioneer Rural Elec Coop, Inc | Open Energy Information

    Open Energy Info (EERE)

    Data Utility Id 15054 Utility Location Yes Ownership C NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Distribution Yes This article is a stub. You can help OpenEI by...

  5. Borough of Goldsboro, Pennsylvania (Utility Company) | Open Energy...

    Open Energy Info (EERE)

    861 Data Utility Id 7359 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Distribution Yes This article is a stub. You can help OpenEI by...

  6. Borough of New Wilmington, Pennsylvania (Utility Company) | Open...

    Open Energy Info (EERE)

    Data Utility Id 13489 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Distribution Yes This article is a stub. You can help OpenEI by...

  7. Northeastern Rural E M C | Open Energy Information

    Open Energy Info (EERE)

    Data Utility Id 20603 Utility Location Yes Ownership C NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Distribution Yes This article is a stub. You can help OpenEI by...

  8. City of Galion, Ohio (Utility Company) | Open Energy Information

    Open Energy Info (EERE)

    861 Data Utility Id 6914 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Distribution Yes This article is a stub. You can help OpenEI by...

  9. City of Gas City, Indiana (Utility Company) | Open Energy Information

    Open Energy Info (EERE)

    861 Data Utility Id 6993 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Distribution Yes This article is a stub. You can help OpenEI by...

  10. City of New Martinsville, West Virginia (Utility Company) | Open...

    Open Energy Info (EERE)

    Data Utility Id 13471 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Distribution Yes This article is a stub. You can help OpenEI by...

  11. Borough of Chambersburg, Pennsylvania (Utility Company) | Open...

    Open Energy Info (EERE)

    861 Data Utility Id 3329 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes RTO PJM Yes Operates Generating Plant Yes Activity Generation Yes Activity Distribution Yes...

  12. Borough of Weatherly, Pennsylvania (Utility Company) | Open Energy...

    Open Energy Info (EERE)

    Data Utility Id 20232 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Distribution Yes This article is a stub. You can help OpenEI by...

  13. Village of Cygnet, Ohio (Utility Company) | Open Energy Information

    Open Energy Info (EERE)

    861 Data Utility Id 4685 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Buying Transmission Yes Activity Distribution Yes This article is a...

  14. Appalachian Power Co | Open Energy Information

    Open Energy Info (EERE)

    861 Data Utility Id 733 Utility Location Yes Ownership I NERC Location RFC NERC RFC Yes RTO PJM Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes...

  15. Union Rural Electric Coop, Inc | Open Energy Information

    Open Energy Info (EERE)

    Data Utility Id 19501 Utility Location Yes Ownership C NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Distribution Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes This...

  16. Guernsey-Muskingum El Coop Inc | Open Energy Information

    Open Energy Info (EERE)

    861 Data Utility Id 7891 Utility Location Yes Ownership C NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Distribution Yes This article is a stub. You can help OpenEI by...

  17. Carroll Electric Coop, Inc | Open Energy Information

    Open Energy Info (EERE)

    861 Data Utility Id 3076 Utility Location Yes Ownership C NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Distribution Yes This article is a stub. You can help OpenEI by...

  18. Central Electric Coop, Inc (Pennsylvania) | Open Energy Information

    Open Energy Info (EERE)

    Data Utility Id 40224 Utility Location Yes Ownership C NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Distribution Yes This article is a stub. You can help OpenEI by...

  19. Village of Beach City, Ohio (Utility Company) | Open Energy Informatio...

    Open Energy Info (EERE)

    861 Data Utility Id 1386 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Buying Transmission Yes Activity Distribution Yes This article is a...

  20. Borough of Park Ridge, New Jersey (Utility Company) | Open Energy...

    Open Energy Info (EERE)

    Data Utility Id 14472 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Distribution Yes This article is a stub. You can help OpenEI by...

  1. Frontier Power Company | Open Energy Information

    Open Energy Info (EERE)

    861 Data Utility Id 6804 Utility Location Yes Ownership C NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Transmission Yes Activity Distribution Yes This article is a stub. You...

  2. Easton Utilities Comm | Open Energy Information

    Open Energy Info (EERE)

    861 Data Utility Id 5625 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes RTO PJM Yes Operates Generating Plant Yes Activity Generation Yes Activity Distribution Yes...

  3. PPL Electric Utilities Corp | Open Energy Information

    Open Energy Info (EERE)

    Data Utility Id 14715 Utility Location Yes Ownership I NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Transmission Yes Activity Distribution Yes Alt Fuel Vehicle Yes Alt...

  4. American Mun Power-Ohio, Inc | Open Energy Information

    Open Energy Info (EERE)

    Data Utility Id 40577 Utility Location Yes Ownership A NERC Location RFC NERC RFC Yes RTO PJM Yes ISO MISO Yes Operates Generating Plant Yes Activity Generation Yes Activity...

  5. City of Dover, Delaware (Utility Company) | Open Energy Information

    Open Energy Info (EERE)

    861 Data Utility Id 5335 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes RTO PJM Yes Operates Generating Plant Yes Activity Generation Yes Activity Distribution Yes...

  6. Borough of Mifflinburg, Pennsylvania (Utility Company) | Open...

    Open Energy Info (EERE)

    Data Utility Id 12523 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Distribution Yes This article is a stub. You can help OpenEI by...

  7. City of Mishawaka, Indiana (Utility Company) | Open Energy Information

    Open Energy Info (EERE)

    Data Utility Id 12674 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Buying Distribution Yes This article is a stub. You can help OpenEI by...

  8. Village of New Bremen, Ohio (Utility Company) | Open Energy Informatio...

    Open Energy Info (EERE)

    Data Utility Id 13420 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Distribution Yes This article is a stub. You can help OpenEI by...

  9. Borough of Quakertown, Pennsylvania (Utility Company) | Open...

    Open Energy Info (EERE)

    Data Utility Id 15541 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Buying Transmission Yes Activity Distribution Yes This article is a...

  10. DTE Energy Trading, Inc | Open Energy Information

    Open Energy Info (EERE)

    Id 25262 Utility Location Yes Ownership W NERC Location RFC NERC ERCOT Yes NERC RFC Yes ISO Ercot Yes RTO PJM Yes ISO NY Yes ISO MISO Yes ISO NE Yes Activity Wholesale Marketing...

  11. PEPCO Energy Services | Open Energy Information

    Open Energy Info (EERE)

    Id 14405 Utility Location Yes Ownership R NERC Location RFC NERC ERCOT Yes NERC RFC Yes ISO Ercot Yes RTO PJM Yes ISO NY Yes ISO NE Yes Activity Retail Marketing Yes Activity...

  12. ACS | Open Energy Information

    Open Energy Info (EERE)

    ACS Jump to: navigation, search Name: ACS Place: Madrid, Spain Zip: 28036 Sector: Solar Product: Madrid based construction company involved in the development of solar thermal...

  13. Village of Minster, Ohio (Utility Company) | Open Energy Information

    Open Energy Info (EERE)

    Data Utility Id 12660 Utility Location Yes Ownership M NERC Location ECAR NERC RFC Yes RTO PJM Yes Activity Distribution Yes This article is a stub. You can help OpenEI by...

  14. Conectiv Energy Supply Inc. | Open Energy Information

    Open Energy Info (EERE)

    EIA Form 861 Data Utility Id 4318 Utility Location Yes Ownership W NERC RFC Yes RTO PJM Yes ISO NY Yes ISO MISO Yes ISO NE Yes Activity Buying Transmission Yes Activity...

  15. JP Morgan | Open Energy Information

    Open Energy Info (EERE)

    NPCC Yes NERC RFC Yes NERC SERC Yes NERC SPP Yes NERC WECC Yes ISO CA Yes ISO Ercot Yes RTO PJM Yes ISO NY Yes RTO SPP Yes ISO MISO Yes ISO NE Yes ISO Other Yes Activity Retail...

  16. Washington Gas Energy Services | Open Energy Information

    Open Energy Info (EERE)

    EIA Form 861 Data Utility Id 20659 Utility Location Yes Ownership R NERC RFC Yes RTO PJM Yes Activity Retail Marketing Yes This article is a stub. You can help OpenEI by...

  17. Old Dominion Electric Coop | Open Energy Information

    Open Energy Info (EERE)

    Id 40229 Utility Location Yes Ownership C NERC Location SERC NERC RFC Yes NERC SERC Yes RTO PJM Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes...

  18. Kansas Gas & Electric Co | Open Energy Information

    Open Energy Info (EERE)

    SPP NERC ERCOT Yes NERC MRO Yes NERC RFC Yes NERC SERC Yes NERC SPP Yes ISO Ercot Yes RTO PJM Yes RTO SPP Yes ISO MISO Yes Operates Generating Plant Yes Activity Generation Yes...

  19. Champion Energy Services | Open Energy Information

    Open Energy Info (EERE)

    Id 54862 Utility Location Yes Ownership R NERC ERCOT Yes NERC RFC Yes ISO Ercot Yes RTO PJM Yes ISO MISO Yes Activity Retail Marketing Yes This article is a stub. You can help...

  20. ACS Symposium Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    224th ACS National Meeting Division of Analytical Chemistry Symposium on Chemical Science Using Synchrotron Radiation Wednesday, August 21, 2002 Sheraton, Boston, MA This symposium...

  1. Microfabricated AC impedance sensor

    DOE Patents [OSTI]

    Krulevitch, Peter; Ackler, Harold D.; Becker, Frederick; Boser, Bernhard E.; Eldredge, Adam B.; Fuller, Christopher K.; Gascoyne, Peter R. C.; Hamilton, Julie K.; Swierkowski, Stefan P.; Wang, Xiao-Bo

    2002-01-01

    A microfabricated instrument for detecting and identifying cells and other particles based on alternating current (AC) impedance measurements. The microfabricated AC impedance sensor includes two critical elements: 1) a microfluidic chip, preferably of glass substrates, having at least one microchannel therein and with electrodes patterned on both substrates, and 2) electrical circuits that connect to the electrodes on the microfluidic chip and detect signals associated with particles traveling down the microchannels. These circuits enable multiple AC impedance measurements of individual particles at high throughput rates with sufficient resolution to identify different particle and cell types as appropriate for environmental detection and clinical diagnostic applications.

  2. AC Transit | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AC Transit logo AC Transit (or the Alameda-Contra Costa Transit District) is based in ... includes 13 cities and adjacent unincorporated areas in Alameda and Contra Costa counties. ...

  3. AC/RF Superconductivity

    SciTech Connect (OSTI)

    Ciovati, Gianluigi

    2015-02-01

    This contribution provides a brief introduction to AC/RF superconductivity, with an emphasis on application to accelerators. The topics covered include the surface impedance of normal conductors and superconductors, the residual resistance, the field dependence of the surface resistance, and the superheating field.

  4. ETA-AC002

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 Revision 2 Effective March 1, 1997 "Control of Test Conduct" Prepared by Electric Transportation Applications Prepared by: _______________________________ Date:__________ Jude M. Clark Approved by: _________________________________________________ Date: _______________ Donald B. Karner Procedure ETA-AC002 Revision 2 2 ©1997 Electric Transportation Applications All Rights Reserved TABLE OF CONTENTS 1.0 Objectives 3 2.0 Purpose 3 3.0 Documentation 3 4.0 Initial Conditions and

  5. ETA-AC003

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Revision 2 Effective March 1, 1997 Preparation and Issuance of Test Reports Prepared by Electric Transportation Applications Prepared by: _______________________________ Date:__________ Jude M. Clark Approved by: _________________________________________________ Date: _______________ Donald B. Karner Procedure ETA-AC003 Revision 2 2 ©1997 Electric Transportation Applications All Rights Reserved TABLE OF CONTENTS 1.0 Objectives 3 2.0 Purpose 3 3.0 Documentation 3 4.0 Initial Conditions and

  6. ETA-AC004

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Revision 2 Effective March 1, 1997 Review of Test Results Prepared by Electric Transportation Applications Prepared by: _______________________________ Date:__________ Jude M. Clark Approved by: _________________________________________________ Date: _______________ Donald B. Karner Procedure ETA-AC004 Revision 2 2 ©1997 Electric Transportation Applications All Rights Reserved TABLE OF CONTENTS 1.0 Objectives 3 2.0 Purpose 3 3.0 Documentation 3 4.0 Initial Conditions and Prerequisites 4 5.0

  7. ETA-AC006

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 Revision 2 Effective: March 1, 1997 Vehicle Verification Prepared by Electric Transportation Applications Prepared by: _______________________________ Date:__________ Jude M. Clark Approved by: _________________________________________________ Date: ______________ Donald B. Karner ETA-AC006 Revision 2 2 ©1997 Electric Transportation Applications All Rights Reserved TABLE OF CONTENTS 1.0 Objectives 3 2.0 Purpose 3 3.0 Documentation 3 4.0 Initial Conditions and Prerequisites 4 5.0 Verification

  8. nsac-2012-rfc | NSAC Subcommittee 2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

  9. rfc:fsn | NSAC Subcommittee 2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fundamental Symmetries and Neutrinos Comments Please add your comments below. Newer comments are displayed nearer the top. Comments on Fundamental Symmetries and Neutrinos Oscar Naviliat-Cuncic, 2012/11/27 08:48 CST The search for new physics through tests of fundamental symmetries requires precision measurements to be carried out using a wide range of physical systems, including muons, neutrons, nuclei, atoms, etc. This is particularly well illustrated in measurements of electric dipole moments

  10. rfc:gen | NSAC Subcommittee 2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    General Comments Please add your comments below. Newer comments are displayed nearer the top. Comments on General Topics Ming Liu, 2012/11/30 17:40 CST I would like to comment from the point of view of a (large) national lab user group. The Los Alamos group has a long history of involvement in the RHIC program from the beginning. RHIC has provided not only an outstanding opportunity for us to carry out a world-class basic science program in Relativistic Heavy Ion and Spin Physics but also to

  11. NSAC-2012-RFC | NSAC Subcommittee 2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

  12. AC Propulsion | Open Energy Information

    Open Energy Info (EERE)

    Inc. is a California Corporation founded in 1992 to develop, manufacture, and license system and component technology for electric vehicle drive systems. References: AC...

  13. AC resistance measuring instrument

    DOE Patents [OSTI]

    Hof, P.J.

    1983-10-04

    An auto-ranging AC resistance measuring instrument for remote measurement of the resistance of an electrical device or circuit connected to the instrument includes a signal generator which generates an AC excitation signal for application to a load, including the device and the transmission line, a monitoring circuit which provides a digitally encoded signal representing the voltage across the load, and a microprocessor which operates under program control to provide an auto-ranging function by which range resistance is connected in circuit with the load to limit the load voltage to an acceptable range for the instrument, and an auto-compensating function by which compensating capacitance is connected in shunt with the range resistance to compensate for the effects of line capacitance. After the auto-ranging and auto-compensation functions are complete, the microprocessor calculates the resistance of the load from the selected range resistance, the excitation signal, and the load voltage signal, and displays of the measured resistance on a digital display of the instrument. 8 figs.

  14. AC Resistance measuring instrument

    DOE Patents [OSTI]

    Hof, Peter J. (Richland, WA)

    1983-01-01

    An auto-ranging AC resistance measuring instrument for remote measurement of the resistance of an electrical device or circuit connected to the instrument includes a signal generator which generates an AC excitation signal for application to a load, including the device and the transmission line, a monitoring circuit which provides a digitally encoded signal representing the voltage across the load, and a microprocessor which operates under program control to provide an auto-ranging function by which range resistance is connected in circuit with the load to limit the load voltage to an acceptable range for the instrument, and an auto-compensating function by which compensating capacitance is connected in shunt with the range resistance to compensate for the effects of line capacitance. After the auto-ranging and auto-compensation functions are complete, the microprocessor calculates the resistance of the load from the selected range resistance, the excitation signal, and the load voltage signal, and displays of the measured resistance on a digital display of the instrument.

  15. Digital ac monitor

    DOE Patents [OSTI]

    Hart, George W. (Natick, MA); Kern, Jr., Edward C. (Lincoln, MA)

    1987-06-09

    An apparatus and method is provided for monitoring a plurality of analog ac circuits by sampling the voltage and current waveform in each circuit at predetermined intervals, converting the analog current and voltage samples to digital format, storing the digitized current and voltage samples and using the stored digitized current and voltage samples to calculate a variety of electrical parameters; some of which are derived from the stored samples. The non-derived quantities are repeatedly calculated and stored over many separate cycles then averaged. The derived quantities are then calculated at the end of an averaging period. This produces a more accurate reading, especially when averaging over a period in which the power varies over a wide dynamic range. Frequency is measured by timing three cycles of the voltage waveform using the upward zero crossover point as a starting point for a digital timer.

  16. Digital ac monitor

    DOE Patents [OSTI]

    Hart, G.W.; Kern, E.C. Jr.

    1987-06-09

    An apparatus and method is provided for monitoring a plurality of analog ac circuits by sampling the voltage and current waveform in each circuit at predetermined intervals, converting the analog current and voltage samples to digital format, storing the digitized current and voltage samples and using the stored digitized current and voltage samples to calculate a variety of electrical parameters; some of which are derived from the stored samples. The non-derived quantities are repeatedly calculated and stored over many separate cycles then averaged. The derived quantities are then calculated at the end of an averaging period. This produces a more accurate reading, especially when averaging over a period in which the power varies over a wide dynamic range. Frequency is measured by timing three cycles of the voltage waveform using the upward zero crossover point as a starting point for a digital timer. 24 figs.

  17. Ac traction gets on track

    SciTech Connect (OSTI)

    O`Connor, L.

    1995-09-01

    This article describes inverter-based ac traction systems which give freight locomotives greater adhesion, pulling power, and braking capacity. In the 1940s, dc traction replaced the steam engine as a source of train propulsion, and it has ruled the freight transportation industry ever since. But now, high-performance ac-traction systems, with their unprecedented levels of pulling power and adhesion, are becoming increasingly common on America`s freight railroads. In thousands of miles of demonstration tests, today`s ac-traction systems have outperformed traditional dc-motor driven systems. Major railroad companies are convinced enough of the benefits of ac traction to have integrated it into their freight locomotives.

  18. 1997RMxAC...6..151L

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RMxAC...6..151L 1997RMxAC...6..151L 1997RMxAC...6..151L

  19. AC Solar Inc | Open Energy Information

    Open Energy Info (EERE)

    Solar Inc Jump to: navigation, search Logo: AC Solar Inc Name: AC Solar Inc Address: P.O. Box 128 Place: Florence, Colorado Zip: 81226 Region: Rockies Area Sector: Solar Product:...

  20. AC power | Princeton Plasma Physics Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AC power Subscribe to RSS - AC power The electricity that runs the Laboratory's experiments and facilities. "AC" stands for the alternating current that comes from large power stations. The term compares with "DC," for "direct current," which comes from sources like batteries. PPPL engineers design and build state-of-the-art controller for AC to DC converter that manages plasma in upgraded fusion machine The electric current that powers fusion experiments requires

  1. Simultaneous distribution of AC and DC power

    DOE Patents [OSTI]

    Polese, Luigi Gentile

    2015-09-15

    A system and method for the transport and distribution of both AC (alternating current) power and DC (direct current) power over wiring infrastructure normally used for distributing AC power only, for example, residential and/or commercial buildings' electrical wires is disclosed and taught. The system and method permits the combining of AC and DC power sources and the simultaneous distribution of the resulting power over the same wiring. At the utilization site a complementary device permits the separation of the DC power from the AC power and their reconstruction, for use in conventional AC-only and DC-only devices.

  2. NONLINEAR MAGNETOHYDRODYNAMICS OF AC HELICITY INJECTION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NONLINEAR MAGNETOHYDRODYNAMICS OF AC HELICITY INJECTION by Fatima Ebrahimi A dissertation submitted in partial fulfillment of the requirements for the degree of Doctor of Philosophy (Physics) at the UNIVERSITY OF WISCONSIN-MADISON 2003 NONLINEAR MAGNETOHYDRODYNAMICS OF AC HELICITY INJECTION Fatima Ebrahimi Under the supervision of Professor Stewart C. Prager At the University of Wisconsin-Madison AC magnetic helicity injection is a technique to sustain current in plasmas in which the current

  3. Solar Electric Grid Integration - Advanced Concepts (SEGIS-AC...

    Energy Savers [EERE]

    Electric Grid Integration - Advanced Concepts (SEGIS-AC) Funding Opportunity Solar Electric Grid Integration - Advanced Concepts (SEGIS-AC) Funding Opportunity Through the Solar ...

  4. 7AC Technologies, Inc. | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7AC Technologies, Inc. America's Next Top Energy Innovator Challenge 498 likes 7AC Technologies, Inc. National Renewable Energy Laboratory Air conditioning is a very large contributor to U.S. and world energy consumption. Heating and cooling costs for commercial and industrial buildings exceed 25 percent of U.S. primary energy consumption (cooling alone accounts for 4.5 Quads out of 40 Quads) and typically accounts for almost half of a building's operating costs. Air conditioning is also a

  5. Three phase AC motor controller

    DOE Patents [OSTI]

    Vuckovich, Michael (Elizabeth, PA); Wright, Maynard K. (Bethel Park, PA); Burkett, John P. (South Huntington Township, Westmoreland County, PA)

    1984-03-20

    A motor controller for a three phase AC motor (10) which is adapted to operate bidirectionally from signals received either from a computer (30) or a manual control (32). The controller is comprised of digital logic circuit means which implement a forward and reverse command signal channel (27, 29) for the application of power through the forward and reverse power switching relays (16, 18, 20, 22). The digital logic elements are cross coupled to prevent activation of both channels simultaneously and each includes a plugging circuit (65, 67) for stopping the motor upon the removal of control signal applied to one of the two channels (27, 29) for a direction of rotation desired. Each plugging circuit (65, 67) includes a one-shot pulse signal generator (88, 102) which outputs a single pulse signal of predetermined pulsewidth which is adapted to inhibit further operation of the application of power in the channel which is being activated and to apply a reversal command signal to the other channel which provides a reversed phase application of power to the motor for a period defined by the pulse-width output of the one-shot signal generator to plug the motor (10) which will then be inoperative until another rotational command signal is applied to either of the two channels.

  6. RFC Sand Creek Development LLC | Open Energy Information

    Open Energy Info (EERE)

    Colorado Zip: 80014 Product: Subsidiary of Republic Financial Corporation set up to invest in Sand Creek Energy LLC, a planned gas to liquid facility. Coordinates: 39.325162,...

  7. ACS National Meeting (San Diego, CA) - JCAP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ACS National Meeting (San Diego, CA) ACS National Meeting (San Diego, CA) Sun, Mar 13, 2016 7:00am 07:00 Thu, Mar 17, 2016 5:00pm 17:00 San Diego Convention Center 111 W Harbor Dr San Diego, CA 92101 Harry Atwater, "Artificial Photosynthesis: Progress, Science Prospects and Technology Outlook" Abstract: The design of highly efficient, non-biological energy conversion system that generate fuels directly from sunlight, water and carbon dioxide is both a formidable challenge and an

  8. Allianz Climate Solutions ACS GmbH | Open Energy Information

    Open Energy Info (EERE)

    Allianz Climate Solutions ACS GmbH Jump to: navigation, search Name: Allianz Climate Solutions (ACS) GmbH Place: Munich, Germany Zip: 80802 Product: Munich-based subsidiary of...

  9. TRANSPORT OF WASTE SIMULANTS IN PJM VENT LINES

    SciTech Connect (OSTI)

    Qureshi, Z

    2007-02-21

    The experimental work was conducted to determine whether there is a potential for waste simulant to transport or 'creep' up the air link line and contaminate the pulse jet vent system, and possibly cause long term restriction of the air link line. Additionally, if simulant creep occurred, establish operating parameters for washing down the line. The amount of the addition of flush fluids and mixer downtime must be quantified.

  10. Answer of Potomac Electric Power Company and PJM lnterconnection...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Docket No. EO-05-01: Pursuant to Rule 213 of the rules of Practice and Procedure of the Federal Energy Regulatory Commission ("FERC" or "Commission"), 18 C.F.R. 385.213, Potomac ...

  11. PJM Interconnection, LLC Smart Grid Project | Open Energy Information

    Open Energy Info (EERE)

    of more advanced applications. The project is aimed at improving electric system reliability and restoration procedures, and preventing the spread of local outages to...

  12. 7AC Technologies, Inc. | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    498 likes 7AC Technologies, Inc. National Renewable Energy Laboratory Air conditioning is a very large contributor to U.S. and world energy consumption. Heating and cooling costs for commercial and industrial buildings exceed 25 percent of U.S. primary energy consumption (cooling alone accounts for 4.5 Quads out of 40 Quads) and typically accounts for almost half of a building's operating costs. Air conditioning is also a significant cause of grid instability with cycling compressor motors

  13. Eco-AC - Energy Innovation Portal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Building Energy Efficiency Building Energy Efficiency Find More Like This Return to Search Eco-AC National Renewable Energy Laboratory Contact NREL About This Technology Technology Marketing Summary Air conditioning of building spaces consumes large amounts of energy in the United States, drives electricity usage during peak electricity demand, and is the single largest user of electricity in U.S. buildings. Thus, reducing our nation's energy consumption requires innovative and cost-effective

  14. ETA-AC06 - Vehicle Verification

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 Revision 0 Effective: March 23, 2001 Vehicle Verification Prepared by Electric Transportation Applications Prepared by: _______________________________ Date:__________ Jude M. Clark Approved by: _________________________________________________ Date: ______________ Donald B. Karner ETA-AC06 Revision 0 2 ©2001 Electric Transportation Applications All Rights Reserved TABLE OF CONTENTS 1.0 Objectives 3 2.0 Purpose 3 3.0 Documentation 3 4.0 Initial Conditions and Prerequisites 4 5.0 Verification

  15. A/C Model Development and Validation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    A/C Model Development and Validation A/C Model Development and Validation 2012 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting PDF icon vss045_lustbader_2012_o.pdf More Documents & Publications A/C Model Development and Validation Vehicle Technologies Office Merit Review 2015: Vehicle Thermal Systems Modeling in Simulink LDV HVAC Model Development and Validation

  16. Scalable Heuristics for Planning, Placement and Sizing of Flexible AC

    Office of Scientific and Technical Information (OSTI)

    Transmission System Devices (Technical Report) | SciTech Connect Technical Report: Scalable Heuristics for Planning, Placement and Sizing of Flexible AC Transmission System Devices Citation Details In-Document Search Title: Scalable Heuristics for Planning, Placement and Sizing of Flexible AC Transmission System Devices Aiming to relieve transmission grid congestion and improve or extend feasibility domain of the operations, we build optimization heuristics, generalizing standard AC Optimal

  17. Light Absorption of Primary Organic Aerosol Paper Named ACS Editors...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Absorption of Primary Organic Aerosol Paper Named ACS Editors' Choice For original submission and image(s), see ARM Research Highlights http:www.arm.govsciencehighlights...

  18. Non-vanishing ponderomotive AC electrophoretic effect for particle trapping

    SciTech Connect (OSTI)

    Guan, Weihau; Park, Jae Hyun nmn; Krstic, Predrag S; Reed, Mark A

    2011-01-01

    We present here a study on overlooked aspects of alternating current (AC) electrokinetics AC electrophoretic (ACEP) phenomena. The dynamics of a particle with both polarizability and net charges in a non-uniform AC electric trapping field is investigated. It is found that either electrophoretic (EP) or dielectrophoretic (DEP) effects can dominate the trapping dynamics, depending on experimental conditions. A dimensionless parameter gamma is developed to predict the relative strength of EP and DEP effects in a quadrupole AC field. An ACEP trap is feasible for charged particles in salt-free or low salt concentration solutions. In contrast to DEP traps, an ACEP trap favors the downscaling of the particle size.

  19. Simultaneous distribution of AC and DC power - Energy Innovation...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    buildings has significant energy savings potential through the elimination of inverters necessary to convert DC source power into AC (Alternating Current) as well as the...

  20. Alameda-Contra Costa Transit District (AC Transit) Fuel Cell...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Alameda-Contra Costa Transit District (AC Transit) Fuel Cell Transit Buses: Third Evaluation Report This report describes operations at Alameda-Contra Costa Transit district for ...

  1. Alameda-Contra Costa Transit District (AC Transit) Fuel Cell...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Alameda-Contra Costa Transit District (AC Transit) Fuel Cell Transit Buses: Third Evaluation Report - Appendices This report describes operations at Alameda-Contra Costa Transit ...

  2. Alameda-Contra Costa Transit District (AC Transit) Fuel Cell...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Preliminary Evaluation Results Alameda-Contra Costa Transit District (AC Transit) Fuel ... Report and Appendices Alameda-Contra Costa Transit District Fuel Cell Transit Buses: ...

  3. AC Transit Demos Three Prototype Fuel Cell Buses | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications Alameda-Contra Costa Transit District (AC Transit) Fuel Cell Transit Buses: Third Evaluation Report - Appendices Alameda-Contra Costa Transit District ...

  4. Electrostatic coalescence system with independent AC and DC hydrophilic electrodes

    DOE Patents [OSTI]

    Hovarongkura, A. David (Arlington, VA); Henry, Jr., Joseph D. (Morgantown, WV)

    1981-01-01

    An improved electrostatic coalescence system is provided in which independent AC and DC hydrophilic electrodes are employed to provide more complete dehydration of an oil emulsion. The AC field is produced between an AC electrode array and the water-oil interface wherein the AC electrode array is positioned parallel to the interface which acts as a grounded electrode. The emulsion is introduced into the AC field in an evenly distributed manner at the interface. The AC field promotes drop-drop and drop-interface coalescence of the water phase in the entering emulsion. The continuous oil phase passes upward through the perforated AC electrode array and enters a strong DC field produced between closely spaced DC electrodes in which small dispersed droplets of water entrained in the continuous phase are removed primarily by collection at hydrophilic DC electrodes. Large droplets of water collected by the electrodes migrate downward through the AC electrode array to the interface. All phase separation mechanisms are utilized to accomplish more complete phase separation.

  5. Contract Number DE-AC27-10RV15051

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract Number DE-AC27-10RV15051 Modification 106 SF-30 Attachment Attachment DE-AC27-10RV15051 MODIFICATION 106 Replacement Pages (Total: 53, including this Cover Page)  Section B.1, Type of Contract - Items Being Acquired, Page B-8  Section H, Special Contract Requirements, Pages i, ii, and H-27  Section I, Contract Clauses, Pages I-1 thru I-48 222-S LAS&T Contract DE-AC27-10RV15051 Conformed thru Contract Modification No. 106 B-8 (e) OPTION PERIOD III: CLIN Number Description

  6. Contract DE-AC04-94AL85000

    National Nuclear Security Administration (NNSA)

    DE-AC04-94AL85000 Modification M508 Attachment 1 SECTION J APPENDIX C Special Bank Account Agreement (Updated Mod M271, M461, M497, M508) Intentionally left blank for Internet...

  7. Initial tests of an AC dipole for the Tevatron

    SciTech Connect (OSTI)

    Miyamoto, R.; Jansson, A.; Kopp, S.; Syphers, M.; /Fermilab

    2006-06-01

    The AC dipole is a device to diagnose transverse motions of a beam. It can achieve large-amplitude oscillations without two inevitable problems of conventional kicker/pinger magnets: decoherence and emittance growth. While not the first synchrotron to operate with an AC dipole, the Tevatron can now make use of its recently upgraded BPM system, providing unprecedented resolution for use with an AC dipole, to measure both linear and nonlinear properties of the accelerator. Plans are to provide AC dipole systems for both transverse degrees of freedom. Preliminary tests have been done using an audio power amplifier with an existing vertical pinger magnet, producing oscillation amplitudes up to 2{sigma} at 150 GeV. In this paper, we will present the configuration of this system. We also show the analysis of a first few data sets, including the direct measurement of beta functions at BPM locations.

  8. Contract Number DE-AC27-10RV15051

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Pages i and H-32 Section J, Attachment 7, Performance Evaluation and Measurement Plan, Page J-127 222-S LAS&T Contract No. DE-AC27-10RV15051 Conformed thru Contract...

  9. Contract DE-AC04-94AL85000

    National Nuclear Security Administration (NNSA)

    DE-AC04-94AL85000 Modification M508 Attachment 1 SECTION J APPENDIX C Special Bank Account Agreement (Updated Mod M271, M461, M497, M508) Intentionally left blank for Internet posting purposes

  10. Development of an AC Module System: Final Technical Report

    SciTech Connect (OSTI)

    Suparna Kadam; Miles Russell

    2012-06-15

    The GreenRay Inc. program focused on simplifying solar electricity and making it affordable and accessible to the mainstream population. This was accomplished by integrating a solar module, micro-inverter, mounting and monitoring into a reliable, 'plug and play' AC system for residential rooftops, offering the following advantages: (1) Reduced Cost: Reduction in installation labor with fewer components, faster mounting, faster wiring. (2) Maximized Energy Production: Each AC Module operates at its maximum, reducing overall losses from shading, mismatch, or module downtime. (3) Increased Safety. Electrical and fire safety experts agree that AC Modules have significant benefits, with no energized wiring or live connections during installation, maintenance or emergency conditions. (4) Simplified PV for a Broader Group of Installers. Dramatic simplification of design and installation of a solar power system, enabling faster and more efficient delivery of the product into the market through well-established, mainstream channels. This makes solar more accessible to the public. (5) Broadened the Rooftop Market: AC Modules enable solar for many homes that have shading, split roofs, or obstructions. In addition, due to the smaller building block size of 200W vs. 1000W, homeowners with budget limitations can start small and add to their systems over time. Through this DOE program GreenRay developed the all-in-one AC Module system with an integrated PV Module and microinverter, custom residential mounting and performance monitoring. Development efforts took the product from its initial concept, through prototypes, to a commercial product sold and deployed in the residential market. This pilot deployment has demonstrated the technical effectiveness of the AC Module system in meeting the needs and solving the problems of the residential market. While more expensive than the traditional central inverter systems at the pilot scale, the economics of AC Modules become more and more favorable as the product matures and is made in high volumes. GreenRay's early customers have been highly enthusiastic about the AC Module system benefits.

  11. AVTA: Aerovironment AC Level 2 Charging System Testing Results | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Aerovironment AC Level 2 Charging System Testing Results AVTA: Aerovironment AC Level 2 Charging System Testing Results The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The following report describes

  12. Diagnostics of the Fermilab Tevatron using an AC dipole

    SciTech Connect (OSTI)

    Miyamoto, Ryoichi; /Texas U.

    2008-08-01

    The Fermilab Tevatron is currently the world's highest energy colliding beam facility. Its counter-rotating proton and antiproton beams collide at 2 TeV center-of-mass. Delivery of such intense beam fluxes to experiments has required improved knowledge of the Tevatron's beam optical lattice. An oscillating dipole magnet, referred to as an AC dipole, is one of such a tool to non-destructively assess the optical properties of the synchrotron. We discusses development of an AC dipole system for the Tevatron, a fast-oscillating (f {approx} 20 kHz) dipole magnet which can be adiabatically turned on and off to establish sustained coherent oscillations of the beam particles without affecting the transverse emittance. By utilizing an existing magnet and a higher power audio amplifier, the cost of the Tevatron AC dipole system became relatively inexpensive. We discuss corrections which must be applied to the driven oscillation measurements to obtain the proper interpretation of beam optical parameters from AC dipole studies. After successful operations of the Tevatron AC dipole system, AC dipole systems, similar to that in the Tevatron, will be build for the CERN LHC. We present several measurements of linear optical parameters (beta function and phase advance) for the Tevatron, as well as studies of non-linear perturbations from sextupole and octupole elements.

  13. System and method for determining stator winding resistance in an AC motor using motor drives

    DOE Patents [OSTI]

    Lu, Bin; Habetler, Thomas G; Zhang, Pinjia

    2013-02-26

    A system and method for determining the stator winding resistance of AC motors is provided. The system includes an AC motor drive having an input connectable to an AC source and an output connectable to an input terminal of an AC motor, a pulse width modulation (PWM) converter having switches therein to control current flow and terminal voltages in the AC motor, and a control system connected to the PWM converter. The control system generates a command signal to cause the PWM converter to control an output of the AC motor drive corresponding to an input to the AC motor, selectively generates a modified command signal to cause the PWM converter to inject a DC signal into the output of the AC motor drive, and determines a stator winding resistance of the AC motor based on the DC signal of at least one of the voltage and current.

  14. Superconducting shielded core reactor with reduced AC losses

    DOE Patents [OSTI]

    Cha, Yung S.; Hull, John R.

    2006-04-04

    A superconducting shielded core reactor (SSCR) operates as a passive device for limiting excessive AC current in a circuit operating at a high power level under a fault condition such as shorting. The SSCR includes a ferromagnetic core which may be either closed or open (with an air gap) and extends into and through a superconducting tube or superconducting rings arranged in a stacked array. First and second series connected copper coils each disposed about a portion of the iron core are connected to the circuit to be protected and are respectively wound inside and outside of the superconducting tube or rings. A large impedance is inserted into the circuit by the core when the shielding capability of the superconducting arrangement is exceeded by the applied magnetic field generated by the two coils under a fault condition to limit the AC current in the circuit. The proposed SSCR also affords reduced AC loss compared to conventional SSCRs under continuous normal operation.

  15. Contract Number DE-AC27-10RV15051

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    01 SF-30 Attachment Attachment DE-AC27-10RV15051 MODIFICATION 101 Replacement Pages (Total: 148, including this Cover Page)  Section J - entire section - pages J-1 thru J-147 222-S LAS&T Contract No. DE-AC27-10RV15051 Conformed thru Contract Modification No. 101 J-1 PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS SECTION J LIST OF ATTACHMENTS Table of Contents ATTACHMENT 1: DOE DIRECTIVES APPLICABLE TO THE 222-S LAB ............................................... 2

  16. Contract Number DE-AC27-10RV15051

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract Number DE-AC27-10RV15051 Modification 100 SF-30 Attachment Attachment DE-AC27-10RV15051 MODIFICATION 100 Replacement Pages (Total: 37, including this Cover Page)  Section B.1, Type of Contract - Items Being Acquired, Page B-i and B-1  Section G.1(d), Electronic Media for Reports/Plans/Documents, Page G-1  Section J, Attachment 1, DOE Directives Applicable to the 222-S Lab, Pages J-1 thru J-3  Section J, Attachment 4, Washington Department of Labor Wage Determination, Pages

  17. Contract Number DE-AC27-10RV15051

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Number DE-AC27-10RV15051 Modification 116 SF-30 Attachment Attachment DE-AC27-10RV15051 MODIFICATION 116 Replacement Pages (Total: 21, including this Cover Page)  Section J, Attachment 7, Performance Evaluation and Measurement Plan, Pages J-127 thru J-146 ¡ ¢ £ ¤ ¢ ¥ ¦ § ¨ ©       ¨    ¡ ¤ §  ¡  ! "  # #  § ¨ © $ ¨  % & '  (  ) § ¨ ©      0 ¨ ' 1 $ 1 

  18. AC Loss Analysis on the Superconducting Coupling Magnet in MICE

    SciTech Connect (OSTI)

    Wu, Hong; Wang, Li; Green, Michael; Li, LanKai; Xu, FengYu; Liu, XiaoKun; Jia, LinXinag

    2008-07-08

    A pair of coupling solenoids is used in MICE experiment to generate magnetic field which keeps the muons within the iris of thin RF cavity windows. The coupling solenoids have a 1.5-meter inner diameter and will produce 7.4 T peak magnetic field. Three types of AC losses in coupling solenoid are discussed. The affect of AC losses on the temperature distribution within the cold mass during charging and rapid discharging process is analyzed also. The analysis result will be further confirmed by the experiment of the prototype solenoid for coupling solenoid, which will be designed, fabricated and tested at ICST.

  19. WTP Contract Section F Contract No. DE-AC27-01RV14136 Conformed...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    F Contract No. DE-AC27-01RV14136 Conformed Thru Modification No. A143 F - i SECTION F DELIVERIES OR PERFORMANCE WTP Contract Section F Contract No. DE-AC27-01RV14136 Conformed Thru...

  20. Docket No. EERE-2011-BT-NOA-0067 and RIN Number 1904-AC52 Ex...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and RIN Number 1904-AC52 Ex parte Communication Docket No. EERE-2011-BT-NOA-0067 and RIN Number 1904-AC52 Ex parte Communication This memorandum for the record provides a ...

  1. WTP Contract Section D Contract No. DE-AC27-01RV14136 Conformed...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    D Contract No. DE-AC27-01RV14136 Conformed Thru Modification No. A143 D - i SECTION D PACKAGING AND MARKING WTP Contract Section D Contract No. DE-AC27-01RV14136 Conformed Thru...

  2. Mission Support Contract Contract No. DE-AC06-09RL14728 Section J

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract No. DE-AC06-09RL14728 Section J Modification 108 Mission Support Contract Contract No. DE-AC06-09RL14728 Section J Modification 108 Mission Support Contract Contract No. DE-AC06-09RL14728 Section J Modification 108 Mission Support Contract Contract No. DE-AC06-09RL14728 Section J Modification 108

  3. AC Losses in the MICE Channel Magnets -- Is This a Curse or aBlessing?

    SciTech Connect (OSTI)

    Green, M.A.; Wu, H.; Wang, L.; Kai, L.L.; Jia, L.X.; Yang, S.Q.

    2008-01-31

    This report discusses the AC losses in the MICE channelmagnets during magnet charging and discharging. This report talks aboutthe three types of AC losses in the MICE magnets; the hysteretic AC lossin the superconductor, the coupling AC loss in the superconductor and theeddy current AC loss in the magnet mandrel and support structure. AClosses increase the heat load at 4 K. The added heat load increases thetemperature of the second stage of the cooler. In addition, AC losscontributes to the temperature rise between the second stage cold headand the high field point of the magnet, which is usually close to themagnet hot spot. These are the curses of AC loss in the MICE magnet thatcan limit the rate at which the magnet can be charge or discharged. Ifone is willing to allow some of the helium that is around the magnet toboil away during a magnet charge or discharge, AC losses can become ablessing. The boil off helium from the AC losses can be used to cool theupper end of the HTS leads and the surrounding shield. The AC losses arepresented for all three types of MICE magnets. The AC loss temperaturedrops within the coupling magnet are presented as an example of how boththe curse and blessing of the AC losses can be combined.

  4. DE-AC05-06OR23100 Section H

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AC05-06OR23100 Section H - Page 1 of 29 PART I - SCHEDULE SECTION H SPECIAL CONTRACT REQUIREMENTS H.1 CONSECUTIVE NUMBERING (MAY 1997)......................................................................... 4 H.2 MODIFICATION AUTHORITY (MAY 1997) ....................................................................... 4 H.3 OVERSIGHT OF CONTRACTOR (OCT 2004)..................................................................... 4 H.4 SMALL BUSINESS SUBCONTRACTING PLAN (SEPT

  5. On-Chip AC self-test controller

    DOE Patents [OSTI]

    Flanagan, John D.; Herring, Jay R.; Lo, Tin-Chee

    2009-09-29

    A system for performing AC self-test on an integrated circuit that includes a system clock for normal operation is provided. The system includes the system clock, self-test circuitry, a first and second test register to capture and launch test data in response to a sequence of data pulses, and a logic circuit to be tested. The self-test circuitry includes an AC self-test controller and a clock splitter. The clock splitter generates the sequence of data pulses including a long data capture pulse followed by an at speed data launch pulse and an at speed data capture pulse followed by a long data launch pulse. The at speed data launch pulse and the at speed data capture pulse are generated for a common cycle of the system clock.

  6. AVTA: Eaton AC Level 2 Charging System Testing Results

    Broader source: Energy.gov [DOE]

    The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The following report describes results from testing done on the Eaton AC Level 2 charging system for plug-in electric vehicles. This research was conducted by Idaho National Laboratory.

  7. Electric Transportation Applications All Rights Reserved ETA-AC001

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 Revision 2 Effective March 1, 1997 Control, Close-out and Storage of Documentation Prepared by Electric Transportation Applications Prepared by: _______________________________ Date:__________ Jude M. Clark Approved by: ______________________________________________ Date: _______________ Donald B. Karner Procedure ETA-AC001 Revision 2 2 ©1997 Electric Transportation Applications All Rights Reserved TABLE OF CONTENTS 1.0 Objectives 3 2.0 Purpose 3 3.0 Documentation 3 4.0 Initial Conditions and

  8. Electric Transportation Applications All Rights Reserved ETA-AC005

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 Revision 2 Effective March 1, 1997 Training and Certification Requirements for Personnel Utilizing ETA Procedures Prepared by Electric Transportation Applications Prepared by: _______________________________ Date:__________ Jude M. Clark Approved by: ______________________________________________ Date: _______________ Donald B. Karner Procedure ETA-AC005 Revision 2 2 ©1997 Electric Transportation Applications All Rights Reserved TABLE OF CONTENTS 1.0 Objectives 3 2.0 Purpose 3 3.0

  9. Electric Transportation Applications All Rights Reserved ETA-AC007

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7 Revision 1 Effective March 1, 1997 "Control of Measuring and Test Equipment (M&TE)" Prepared by Electric Transportation Applications Prepared by: _______________________________ Date:__________ Jude M. Clark Approved by: _________________________________________________ Date: _______________ Donald B. Karner Procedure ETA-AC007 Revision 1 ©1997 Electric Transportation Applications All Rights Reserved 2 TABLE OF CONTENTS 1.0 Objectives 3 2.0 Purpose 3 3.0 Documentation Support 3

  10. AC electrokinetic manipulation of selenium nanoparticles for potential nanosensor applications

    SciTech Connect (OSTI)

    Mahmoodi, Seyed Reza; Bayati, Marzieh; Hosseinirad, Somayeh; Foroumadi, Alireza; Gilani, Kambiz; Rezayat, Seyed Mahdi

    2013-03-15

    Highlights: ? Se nanoparticles were synthesized using a reverse-microemulsion process. ? AC osmotic fluid flow repulses the particles from electrode edges. ? Dielectrophoretic force attracts the particles to electrode edges. ? Dielectrophoresis electrode showed non-ohmic behavior. ? The device can potentially be used as a nanosensor. - Abstract: We report the AC electrokinetic behavior of selenium (Se) nanoparticles for electrical characterization and possible application as micro/nano devices. selenium Se nanoparticles were successfully synthesized using a reverse-microemulsion process and investigated structurally using X-ray diffraction and transmission electron microscope. Interdigitated castellated ITO and non-castellated platinum electrodes were employed for manipulation of suspended materials in the fluid. Using ITO electrodes at low frequency limits resulted in deposition of Se particles on electrode surface. When Se particles exposed to platinum electrodes in the 10 Hz1 kHz range and V {sub p?p}> 8, AC osmotic fluid flow repulses the particles from electrode edges. However, in 10 kHz10 MHz range and V {sub p?p}> 5, dielectrophoretic force attracts the particles to electrode edges. As the Se particle concentration increased, the trapped Se particles were aligned along the electric field line and bridged the electrode gap. The device was characterized and can potentially be useful in making micro/nano electronic devices.

  11. System and method for determining stator winding resistance in an AC motor

    DOE Patents [OSTI]

    Lu, Bin (Kenosha, WI); Habetler, Thomas G. (Snellville, GA); Zhang, Pinjia (Atlanta, GA); Theisen, Peter J. (West Bend, WI)

    2011-05-31

    A system and method for determining stator winding resistance in an AC motor is disclosed. The system includes a circuit having an input connectable to an AC source and an output connectable to an input terminal of an AC motor. The circuit includes at least one contactor and at least one switch to control current flow and terminal voltages in the AC motor. The system also includes a controller connected to the circuit and configured to modify a switching time of the at least one switch to create a DC component in an output of the system corresponding to an input to the AC motor and determine a stator winding resistance of the AC motor based on the injected DC component of the voltage and current.

  12. Low-temperature transport in ac-driven quantum dots in the Kondo regime

    SciTech Connect (OSTI)

    Lopez, Rosa; Aguado, Ramon; Platero, Gloria; Tejedor, Carlos

    2001-08-15

    We present a fully nonequilibrium calculation of the low-temperature transport properties of a quantum dot in the Kondo regime when an ac potential is applied to the gate. We solve a time-dependent Anderson model with finite on-site Coulomb interaction. The interaction self-energy is calculated up to second order in perturbation theory in the on-site interaction, in the context of the Keldysh nonequilibrium technique, and the effect of the ac voltage is taken into account exactly for all ranges of ac frequencies and ac intensities. The obtained linear conductance and time-averaged density of states of the quantum dot evolve in a nontrivial way as a function of the ac frequency and ac intensity of the harmonic modulation.

  13. Dielectric response of multiwalled carbon nanotubes as a function of applied ac-electric fields

    SciTech Connect (OSTI)

    Basu, Rajratan; Iannacchione, Germano S.

    2008-12-01

    The complex dielectric constant ({epsilon}{sup *}) is reported for multiwalled carbon nanotubes (MWCNTs) up to 10{sup 5} Hz as a function of ac-electric field amplitudes E{sub rot} (in phase and same frequency as the measurement) and E{sub ac} (different phase and fixed frequency with respect to the measurement). A slow relaxation process (mode 1) is observed, which shifts to higher frequency with increasing E{sub rot} but is independent of E{sub ac}. A fast relaxation process (mode 2) is also observed, which is independent of E{sub rot} but shifts to higher frequency with increasing E{sub ac} (opposite to that of mode 1). An ac-conductivity analysis of MWCNT reveals insights on how E{sub rot} and E{sub ac} influence the dissipation.

  14. Mission Support Contract Section J Contract No. DE-AC06-09RL14728

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Section J Contract No. DE-AC06-09RL14728 J-5-1 ATTACHMENT J-5 PERFORMANCE GUARANTEE AGREEMENT Modification 479 Mission Support Contract Section J Contract No. DE-AC06-09RL14728 J-5-2 Mission Support Contract Section J Contract No. DE-AC06-09RL14728 J-5-3 Mission Support Contract Section J Contract No. DE-AC06-09RL14728 J-5-4 Mission Support Contract Section J Contract No. DE-AC06-09RL14728 J-5-5 Section J Modification 479 Mission Support Contract Contract No. DE-AC06-09RL14728 Section J

  15. Programmable AC power supply for simulating power transient expected in fusion reactor

    SciTech Connect (OSTI)

    Halimi, B.; Suh, K. Y.

    2012-07-01

    This paper focus on control engineering of the programmable AC power source which has capability to simulate power transient expected in fusion reactor. To generate the programmable power source, AC-AC power electronics converter is adopted to control the power of a set of heaters to represent the transient phenomena of heat exchangers or heat sources of a fusion reactor. The International Thermonuclear Experimental Reactor (ITER) plasma operation scenario is used as the basic reference for producing this transient power source. (authors)

  16. 222-S LAS&T Contract No. DE-AC27-10RV15051 Conformed...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DE-AC27-10RV15051 Conformed thru Initial Award i PART I - THE SCHEDULE SECTION D - PACKAGING AND MARKING TABLE OF CONTENTS D.1 PACKAGING ......

  17. The War of the Currents: AC vs. DC Power | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Power Company decided to award Westinghouse -- who had licensed Tesla's polyphase AC induction motor patent -- the contract to generate power from Niagara Falls. Although some...

  18. Current Obsession: AC/DC | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Current Obsession: AC/DC Sarah Wagoner Sarah Wagoner Communications Specialist, Wind and Water Power Technologies Office Though humans have been harnessing water to perform work for thousands of years, the evolution of modern hydropower began in the late 1800's-coincidentally at the same time that Thomas Edison and Nikola Tesla were embroiled in a battle now known as the War of the Currents. Edison developed direct current (DC)-current that runs continually in a single direction-like in a

  19. DE-AC06-97RL13184

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DE-AC06-97RL13184 Modification 160 G-3 U. S. Department of Energy U.S. Department of Energy Richland Operations Office Richland Operations Office Assistant Manager for the Procurement Division River Corridor attn: Russell Walter, MSIN A7-80 Attn: D.J. Ortiz, MSIN A3-04 P.O. Box 550 P.O. Box 550 Richland, WA 99352 Richland, WA 99352 (One Copy) (One Copy) U. S. Department of Energy Oak Ridge Operations Office Oak Ridge Financial Service Center 200 Administration Road Oak Ridge, TN 37830 (One Copy)

  20. Contract DE-AC27-08RV14800

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract DE-AC27-08RV14800 Modification 105 SF30 Continuation Page, Block 14 Page 2 of 22 Purpose of Modification: The purpose of this modification is to do the following: 1. Definitize the contract Change Order issued in modification 084 to implement the removal of the Californium Sources. The addition of this new requirement increases the cost of CLIN 1 by $298,254 and increases fee in the amount of $26,843, for a total increase in contract value of $325,097. 2. Update Section J, Attachment

  1. Contract No. DE-AC27-10RV15051

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    No. DE-AC27-10RV15051 Modification No. 118 SF-30 Continuation Page 2 of 3 14. Description of Amendment/Modification Continued: 1. Section B.1, Type of Contract - Items Being Acquired, is revised to increase the obligated funds for Contract Line Item (CLIN) 7 by $3,000,000.00, from $0.00 to $3,000,000.00. The total amount of funds obligated to the contract is increased from $64,465,917.21 to $67,465,917.21. The change is as follows: FROM: TOTAL FUNDS OBLIGATED CLIN Number Description Estimated

  2. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    OTHER ___________ (x) x DE-AC05-06OR23100 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already

  3. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DE-AC05-06OR23100 Modification No. 507 11 PART I - THE SCHEDULE SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS B.1 ITEMS BEING ACQUIRED (ALTERNATE I) (OCT 2004) The Contractor shall furnish all personnel, facilities, equipment, material, supplies, and services (except as may be expressly set forth in this contract as furnished by the Government) and otherwise do all things necessary for, or incident to, the performance and provision of the following items of work: Item 1 - See Section C, Clause

  4. Contract No. DE-AC04-94AL85000

    National Nuclear Security Administration (NNSA)

    Contract No. DE-AC04-94AL85000 Modification No. 473 Page 2 of 36 1. Section B, Clause B-2, Contract Type and Value is amended as follows: (i) Paragraph (b) is revised to add the total estimated cost entry under "Contract Periods" and "Estimated Cost" for FY 2013, changing the "TOTAL through" entry, and adding a place holder for the two option periods as follows: Add: October 1, 2012 through September 30, 2013 $ 2,462,698,305 Option 1: October 1, 2013 through $ TBD*

  5. Fluctuation of an ion beam extracted from an AC filament driven Bernas-type ion source

    SciTech Connect (OSTI)

    Miyamoto, N. Okajima, Y.; Wada, M.

    2014-02-15

    Argon ion beam fluctuation from an AC filament driven Bernas-type ion source is observed. The ion beam was measured by an 8 measurement elements beam profile monitor. The amplitude of the beam current fluctuation stayed in the same level from 100 Hz to 1 kHz of the filament heating frequency. The beam current fluctuation frequency measured by the beam profile monitor was equal to the frequency of the AC filament operation. The fluctuation amplitudes of the beam current by AC operation were less than 7% and were in the same level of the DC operation.

  6. Segmented superconducting tape having reduced AC losses and method of making

    DOE Patents [OSTI]

    Foltyn, Stephen R. (Los Alamos, NM); Jia, Quanxi (Los Alamos, NM); Arendt, Paul N. (Los Alamos, NM); Holesinger, Terry G. (Los Alamos, NM); Wang, Haiyan (Los Alamos, NM)

    2009-09-22

    A superconducting tape having reduced AC losses. The tape has a high temperature superconductor layer that is segmented. Disruptive strips, formed in one of the tape substrate, a buffer layer, and the superconducting layer create parallel discontinuities in the superconducting layer that separate the current-carrying elements of the superconducting layer into strips or filament-like structures. Segmentation of the current-carrying elements has the effect of reducing AC current losses. Methods of making such a superconducting tape and reducing AC losses in such tapes are also disclosed.

  7. Greener Commercial A/C Units Becoming a Cool Item | Department of Energy

    Office of Environmental Management (EM)

    Greener Commercial A/C Units Becoming a Cool Item Greener Commercial A/C Units Becoming a Cool Item July 1, 2010 - 5:11pm Addthis Greener Commercial A/C Units Becoming a Cool Item Stephen Graff Former Writer & editor for Energy Empowers, EERE A new federal tax credit is helping McQuay International expand its line of energy-efficient HVAC products at two of its plants and bring back furloughed workers. With the help of a 48C manufacturing tax credit worth $2 million under the American

  8. Preliminary Response of PJM Interconnection, L.L.C. to the Operating...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    plan that offers greater reliability protection for the District of Columbia. ... Operation at Mirant's Potomac River Generating Station and Proposed Mirant Compliance Plan ...

  9. Response by PJM to letters from the City of Alexandria and the...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    facilities serving the District of Columbia be deferred until some later date. ... Operation of the Potomac River Generating Station in Alexandria, Virginia Request that ...

  10. Docket No. EERE-2012-BT-TP-0046; RIN 1904-AC52 Ex partecommunication...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ex parte communication Meeting of May 16, 2013 Docket No. EERE-2012-BT-TP-0046; RIN 1904-AC52 Ex parte communication Meeting of May 16, 2013 This memorandum for the record ...

  11. DOE 10 CFR Part 431 EERE-2010-BT-TP-0036 RIN 1904-AC-38 Submission...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE 10 CFR Part 431 EERE-2010-BT-TP-0036 RIN 1904-AC-38 Submission of Comments by Howe Corporation Comments to the following DOE Proposed Rules: 10 CFR Part 431 Docket No. ...

  12. Tank Operations Contract Section J Contract No. DE-AC27-08RV14800...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    J Contract No. DE-AC27-08RV14800 Modification No. 280 J.4-1 SECTION J, ATTACHMENT J.4 PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) Tank Operations Contract Section J Contract...

  13. Plateau Remediation Contract Section J Contract No. DE-AC06...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    No. 439 J 4-1 August 31, 2015 ATTACHMENT J.4 PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) Plateau Remediation Contract Section J Contract No. DE-AC06-08RL14788 Modification...

  14. Microsoft Word - DE-AC06-09RL15009 Section J.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    III Contract No. DE-AC06-09RL15009 Section J Page J-1 Section J Part III - List of Attachments Table of Contents Section Title Page No. J.1 Covered Site ContractorsSub-Contractors...

  15. Contract DE-AC04-94AL85000 Modification M508

    National Nuclear Security Administration (NNSA)

    Contract DE-AC04-94AL85000 Modification M508 Attachment 1 SECTION J APPENDIX C Special Bank Account Agreement (Updated Mod M271, M461, M497, M508) Intentionally left blank for...

  16. AEP (Central and SWEPCO)- Coolsaver A/C Tune Up or Replacement

    Broader source: Energy.gov [DOE]

    Participating customers are eligible to receive a $75 coupon for use toward A/C and heat pump efficiency services performed as a result of the program’s tune-up analysis, contractors are eligible...

  17. Alameda-Contra Costa Transit District (AC Transit) Fuel Cell Transit Buses: Preliminary Evaluation Results

    SciTech Connect (OSTI)

    Chandler, K.; Eudy, L.

    2007-03-01

    This report provides an evaluation of three prototype fuel cell-powered transit buses operating at AC Transit in Oakland, California, and six baseline diesel buses similar in design to the fuel cell buses.

  18. Solar Electric Grid Integration- Advanced Concepts (SEGIS-AC) Funding Opportunity

    Broader source: Energy.gov [DOE]

    Through the Solar Electric Grid Integration – Advanced Concepts (SEGIS-AC) program, DOE is funding solar projects that are targeting ways to develop power electronics and build smarter, more...

  19. Contract DE-AC02-07CH11358 Modifications Language Changes

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AC02-07CH11358 Modifications Language Changes Modification 183 October 23, 2015 Part I, Section H - Special Contract Requirements (replace Mod 171) Part II, Section I - Contract...

  20. System and Battery Charge Control for PV-Powered AC Lighting Systems

    SciTech Connect (OSTI)

    Kern, G.

    1999-04-01

    This report reviews a number of issues specific to stand-alone AC lighting systems. A review of AC lighting technology is presented, which discusses the advantages and disadvantages of various lamps. The best lamps for small lighting systems are compact fluorescent. The best lamps for intermediate-size systems are high- or low-pressure sodium. Specifications for battery charging and load control are provided with the goal of achieving lamp lifetimes on the order of 16,000 to 24,000 hours and battery lifetimes of 4 to 5 years. A rough estimate of the potential domestic and global markets for stand-alone AC lighting systems is presented. DC current injection tests were performed on high-pressure sodium lamps and the test results are presented. Finally, a prototype system was designed and a prototype system controller (with battery charger and DC/AC inverter) was developed and built.

  1. Contract DE-AC04-94AL85000 Modification M508

    National Nuclear Security Administration (NNSA)

    Contract DE-AC04-94AL85000 Modification M508 Attachment 1 SECTION J APPENDIX C Special Bank Account Agreement (Updated Mod M271, M461, M497, M508) Intentionally left blank for Internet posting purposes.

  2. AVTA Voltec AC Level 1 and Level 2 Charging Systems Testing Results |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy AVTA Voltec AC Level 1 and Level 2 Charging Systems Testing Results AVTA Voltec AC Level 1 and Level 2 Charging Systems Testing Results The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The

  3. AVTA: Blink AC Level 2 Charging System Testing Results | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Blink AC Level 2 Charging System Testing Results AVTA: Blink AC Level 2 Charging System Testing Results The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The following report describes results from testing

  4. AVTA: ChargePoint AC Level 2 Charging System Testing Results | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy ChargePoint AC Level 2 Charging System Testing Results AVTA: ChargePoint AC Level 2 Charging System Testing Results The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The following report describes results

  5. AVTA: Clipper Creek AC Level 2 Charging System Testing Results | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Clipper Creek AC Level 2 Charging System Testing Results AVTA: Clipper Creek AC Level 2 Charging System Testing Results The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The following report describes

  6. AVTA: GE Energy WattStation AC Level 2 Charging System Testing Results |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Energy WattStation AC Level 2 Charging System Testing Results AVTA: GE Energy WattStation AC Level 2 Charging System Testing Results The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The

  7. AVTA: GE Smart Grid Capable AC Level 2 Testing Results | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy GE Smart Grid Capable AC Level 2 Testing Results AVTA: GE Smart Grid Capable AC Level 2 Testing Results The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The following report describes results from testing

  8. AVTA: SPX AC Level 2 Charging System Testing Results | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SPX AC Level 2 Charging System Testing Results AVTA: SPX AC Level 2 Charging System Testing Results The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The following report describes results from testing done on the SPX

  9. AVTA: Schneider AC Level 2 Charging System Testing Results | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Schneider AC Level 2 Charging System Testing Results AVTA: Schneider AC Level 2 Charging System Testing Results The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The following report describes results from

  10. AVTA: Siemens-VersiCharge AC Level 2 Charging System Testing Results |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Siemens-VersiCharge AC Level 2 Charging System Testing Results AVTA: Siemens-VersiCharge AC Level 2 Charging System Testing Results The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The following

  11. Alameda-Contra Costa Transit District (AC Transit) Fuel Cell Transit Buses:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Preliminary Evaluation Results | Department of Energy Preliminary Evaluation Results Alameda-Contra Costa Transit District (AC Transit) Fuel Cell Transit Buses: Preliminary Evaluation Results This report provides an evaluation of three prototype fuel cell-powered transit buses operating at AC Transit in Oakland, California, and six baseline diesel buses similar in design to the fuel cell buses. PDF icon 41041.pdf More Documents & Publications Connecticut Transit (CTTRANSIT) Fuel Cell

  12. FY 2013 Performance Evaluation Report Sandia Corporation, Contract DE-AC04-94AL85000

    National Nuclear Security Administration (NNSA)

    3 Performance Evaluation Report Sandia Corporation, Contract DE-AC04-94AL85000 National Nuclear Security Administration FY 2013 Performance Evaluation Report FOR Sandia Corporation Sandia Field Office Sandia National Laboratories Performance Period: October 2012 - September 2013 DATE: December 23, 2013 Sandia Field Office December 23, 2013 FY 2013 Performance Evaluation Report Page 1 of 23 Sandia Corporation, Contract DE-AC04-94AL85000 Executive Summary This Performance Evaluation Report (PER)

  13. Magnetostrictive materials and method for improving AC characteristics in same

    DOE Patents [OSTI]

    Pulvirenti, Patricia P. (Chicago, IL); Jiles, David C. (Ames, IA)

    2001-08-14

    The present invention provides Terfenol-D alloys ("doped" Terfenol) having optimized performances under the condition of time-dependent magnetic fields. In one embodiment, performance is optimized by lowering the conductivity of Terfenol, thereby improving the frequency response. This can be achieved through addition of Group III or IV elements, such as Si and Al. Addition of these types of elements provides scattering sites for conduction electrons, thereby increasing resistivity by 125% which leads to an average increase in penetration depth of 80% at 1 kHz and an increase in energy conversion efficiency of 55%. The permeability of doped Terfenol remains constant over a wider frequency range as compared with undoped Terfenol. These results demonstrate that adding impurities, such as Si and Al, are effective in improving the ac characteristics of Terfenol. A magnetoelastic Gruneisen parameter, .gamma..sub.me, has also been derived from the thermodynamic equations of state, and provides another means by which to characterize the coupling efficiency in magnetostrictive materials on a more fundamental basis.

  14. System and method for monitoring and controlling stator winding temperature in a de-energized AC motor

    DOE Patents [OSTI]

    Lu, Bin (Kenosha, WI); Luebke, Charles John (Sussex, WI); Habetler, Thomas G. (Snellville, GA); Zhang, Pinjia (Atlanta, GA); Becker, Scott K. (Oak Creek, WI)

    2011-12-27

    A system and method for measuring and controlling stator winding temperature in an AC motor while idling is disclosed. The system includes a circuit having an input connectable to an AC source and an output connectable to an input terminal of a multi-phase AC motor. The circuit further includes a plurality of switching devices to control current flow and terminal voltages in the multi-phase AC motor and a controller connected to the circuit. The controller is configured to activate the plurality of switching devices to create a DC signal in an output of the motor control device corresponding to an input to the multi-phase AC motor, determine or estimate a stator winding resistance of the multi-phase AC motor based on the DC signal, and estimate a stator temperature from the stator winding resistance. Temperature can then be controlled and regulated by DC injection into the stator windings.

  15. Contract No. DE-AC02-09CH11466 Section J - Appendix F J-F-1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    52 Contract No. DE-AC02-09CH11466 Section J - Appendix F J-F-1 Attachment J.6 APPENDIX F Contractor Resources, Commitments, and Agreements Contract No. DE-AC02-09CH11466 Modification No. 0152 Contract No. DE-AC02-09CH11466 Section J - Appendix F J-F-2 This page intentionally blank Modification No. 0152 Contract No. DE-AC02-09CH11466 Section J - Appendix F J-F-3 RESOURCES, SERVICES, AND SUPPORT PROVIDED TO PPPL Princeton University has committed substantial resources and services over the first

  16. Methods, systems and apparatus for controlling operation of two alternating current (AC) machines

    DOE Patents [OSTI]

    Gallegos-Lopez, Gabriel (Torrance, CA); Nagashima, James M. (Cerritos, CA); Perisic, Milun (Torrance, CA); Hiti, Silva (Redondo Beach, CA)

    2012-02-14

    A system is provided for controlling two AC machines. The system comprises a DC input voltage source that provides a DC input voltage, a voltage boost command control module (VBCCM), a five-phase PWM inverter module coupled to the two AC machines, and a boost converter coupled to the inverter module and the DC input voltage source. The boost converter is designed to supply a new DC input voltage to the inverter module having a value that is greater than or equal to a value of the DC input voltage. The VBCCM generates a boost command signal (BCS) based on modulation indexes from the two AC machines. The BCS controls the boost converter such that the boost converter generates the new DC input voltage in response to the BCS. When the two AC machines require additional voltage that exceeds the DC input voltage required to meet a combined target mechanical power required by the two AC machines, the BCS controls the boost converter to drive the new DC input voltage generated by the boost converter to a value greater than the DC input voltage.

  17. Methods, systems and apparatus for controlling operation of two alternating current (AC) machines

    DOE Patents [OSTI]

    Gallegos-Lopez, Gabriel (Torrance, CA); Nagashima, James M. (Cerritos, CA); Perisic, Milun (Torrance, CA); Hiti, Silva (Redondo Beach, CA)

    2012-06-05

    A system is provided for controlling two alternating current (AC) machines via a five-phase PWM inverter module. The system comprises a first control loop, a second control loop, and a current command adjustment module. The current command adjustment module operates in conjunction with the first control loop and the second control loop to continuously adjust current command signals that control the first AC machine and the second AC machine such that they share the input voltage available to them without compromising the target mechanical output power of either machine. This way, even when the phase voltage available to either one of the machines decreases, that machine outputs its target mechanical output power.

  18. System for transmitting low frequency analog signals over AC power lines

    DOE Patents [OSTI]

    Baker, Steven P. (Powell, TN); Durall, Robert L. (Lenoir City, TN); Haynes, Howard D. (Knoxville, TN)

    1989-01-01

    A system for transmitting low frequency analog signals over AC power lines using FM modulation. A low frequency analog signal to be transmitted is first applied to a voltage-to-frequency converter where it is converted to a signal whose frequency varies in proportion to the analog signal amplitude. This signal is then used to modulate the carrier frequency of an FM transmitter coupled to an AC power line. The modulation signal frequency range in selected to be within the response band of the FM transmitter. The FM modulated carrier signal is received by an FM receiver coupled to the AC power line, demodulated and the demodulated signal frequency is converted by a frequency-to-voltage converter back to the form of the original low frequency analog input signal.

  19. A system for tranmitting low frequency analog signals over ac power lines

    DOE Patents [OSTI]

    Baker, S.P.; Durall, R.L.; Haynes, H.D.

    1987-07-30

    A system for transmitting low frequency analog signals over ac power lines using FM modulation. A low frequency analog signal to be transmitted is first applied to a voltage-to-frequency converter where it is converted to a signal whose frequency varies in proportion to the analog signal amplitude. This signal is then used to modulate the carrier frequency of an FM transmitter coupled to an ac power line. The modulation signal frequency range is selected to be within the response band of the FM transmitter. The FM modulated carrier signal is received by an FM receiver coupled to the ac power line, demodulated and the demodulated signal frequency is converted by a frequency-to-voltage converter back to the form of the original low frequency analog input signal. 4 figs.

  20. Method And Apparatus For Production Of Bi-213 From The Activity Ac-225 Source

    DOE Patents [OSTI]

    Egorov, Oleg B. (West Richland, WA); O'Hara, Matthew J. (Richland, WA)

    2005-12-06

    A method and apparatus for isolating and purifying a .sup.213 Bi radioactive isotope from an .sup.225 Ac source using a primary column and a primary sorbent which preferentially retains .sup.225 Ac over .sup.213 Bi when exposed to a compatible solvent in combination with a secondary column having a secondary sorbent which retains .sup.213 Bi when exposed to a mixture of the compatible solvent and .sup.213 Bi. A "compatible solvent" is a solvent which will preferentially remove .sup.213 Bi radioactive isotopes from a primary sorbent without removing .sup.225 Ac radioactive isotopes, and then allow .sup.213 Bi radioactive isotopes removed from the primary sorbent to be retained on a secondary sorbent, without having to dilute or otherwise chemically or physically modify the compatible solvent in between exposure to the primary and secondary sorbents.

  1. Linear optics measurements and corrections using an AC dipole in RHIC

    SciTech Connect (OSTI)

    Wang, G.; Bai, M.; Yang, L.

    2010-05-23

    We report recent experimental results on linear optics measurements and corrections using ac dipole. In RHIC 2009 run, the concept of the SVD correction algorithm is tested at injection energy for both identifying the artificial gradient errors and correcting it using the trim quadrupoles. The measured phase beatings were reduced by 30% and 40% respectively for two dedicated experiments. In RHIC 2010 run, ac dipole is used to measure {beta}* and chromatic {beta} function. For the 0.65m {beta}* lattice, we observed a factor of 3 discrepancy between model and measured chromatic {beta} function in the yellow ring.

  2. Docket No. EERE-2012-BT-TP-0046; RIN 1904-AC52 | Department of

    Energy Savers [EERE]

    Energy Docket No. EERE-2012-BT-TP-0046; RIN 1904-AC52 This memorandum for the record provides a summary of a visit by Mr. Roland Risser, Program Manager, Building Technologies Program, U.S. Department of Energy, to the February 22, 2013, meeting of the Steering Committee for the Set-Top Box Voluntary Agreement in Washington, D.C. PDF icon CEA memo to DOE re ex parte communication_2-28-13.pdf More Documents & Publications Docket No. EERE-2012-BT-TP-0046; RIN 1904-AC52 Ex parte

  3. Contract No.: DE-AC02-07CH11358 Contract Modification No. 0159

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    : DE-AC02-07CH11358 Contract Modification No. 0159 Section J, Appendix C ATTACHMENT J.3 APPENDIX C SPECIAL FINANCIAL INSTITUTION ACCOUNT AGREEMENT Applicable to the Operation of AMES Laboratory Contract No. DE-AC02-07CH11358 AMENDMENT 8 TO SPECIAL FINANCIAL INSTITUTION ACCOUNT Page 1 of 2 AGREEMENT FOR USE WITH THE PAYMENTS CLEARED FINANCING ARRANGEMENT between BANKERS TRUST COMPANY, N.A. (hereinafter referred to as the "Financial Institution"), and IOWA STATE UNIVERSITY of Science and

  4. Microsoft Word - DE-AC06-09RL15009 Section C.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Part I Contract No. DE-AC06-09RL15009 Section C Page C-1 Section C Statement of Work Table of Contents Section Page C.1 Introduction C-2 C.2 Performance Requirements, CLIN0001-CLIN0007 C-3 C.3 Additional Performance Requirements for Claims Management C-3 C.4 Management and Oversight of Insurance Claim Number 8600434 C-7 C.5 Energy Employees Occupational Illness Compensation Program Act (EEOICPA) CLIN0008 C-7 Workers' Compensation Claims Services Part I Contract No. DE-AC06-09RL15009 Section C

  5. Mission Support Contract Section J-16 Contract No. DE-AC-09RL14728 Modification 080

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Section J-16 Contract No. DE-AC-09RL14728 Modification 080 Page 1 of 2 Task Order 11-002 Independent Assessment of the 618-10 Burial Ground Characterization The contractor shall provide the following services, as requested and as described below. The Contractor shall perform these services in accordance with Contract DE-AC06-09RL14728, C.2.5, Portfolio Management, meet milestones and delivery schedules as established by the Federal Project Director, River Corridor Closure Project and/or his

  6. Surplus Facilities Management Program (SFMP) Contract No. DE-AC05-810R20722

    Office of Legacy Management (LM)

    '^ l '"17 ^' ~/t~ >7~ 6~'1 ~DOE/OR/20722-18 Surplus Facilities Management Program (SFMP) Contract No. DE-AC05-810R20722 NIAGARA FALLS STORAGE SITE ENVIRONMENTAL MONITORING REPORT Calendar Year 1983 July 1984 Bechtel National, Inc. Advanced Technology Division DOE/OR/20722-18 NIAGARA FALLS STORAGE SITE ENVIRONMENTAL MONITORING REPORT CALENDAR YEAR 1983 July 1984 Prepared for U.S. DEPARTMENT OF ENERGY OAK RIDGE OPERATIONS OFFICE Under Contract No. DE-AC05-810R20722 By Bechtel National,

  7. Turning on the Fan and Turning off the A/C | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Turning on the Fan and Turning off the A/C Turning on the Fan and Turning off the A/C September 20, 2010 - 3:00pm Addthis As part of some recent money- and energy-savings improvements I've been making to my home, a couple of weeks ago I installed a ceiling fan in my main living room. Chris Stewart Senior Communicator at DOE's National Renewable Energy Laboratory As part of some recent money- and energy-savings improvements I've been making to my home, a couple of weeks ago I installed a ceiling

  8. The War of the Currents: AC vs. DC Power | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The War of the Currents: AC vs. DC Power The War of the Currents: AC vs. DC Power November 18, 2014 - 11:55am Addthis Electrical transmission lines cross a snow-covered field in Dallas Dam, Oregon. | Photo courtesy of the Energy Department Electrical transmission lines cross a snow-covered field in Dallas Dam, Oregon. | Photo courtesy of the Energy Department Allison Lantero Allison Lantero Digital Content Specialist, Office of Public Affairs How can I participate? Check out our Infographic on

  9. Mission Support Contract Attachment J.10 Contract No. DE-AC06-09RL14728 Modification 464

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Attachment J.10 Contract No. DE-AC06-09RL14728 Modification 464 Table Of Contents J.10-1 SERVICE CONTRACT ACT: WAGE DETERMINATION ...................................................................... 2 J.10-2 DAVIS BACON ACT: GENERAL DECISION ..................................................................................... 23 J.10-3 COLLECTIVE BARGAINING ACT: WAGE DETERMINATION .................................. 30 Mission Support Contract Attachment J.10 Contract No. DE-AC06-09RL14728

  10. 222-S LAS&T Contract No. DE-AC27-10RV15051

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract No. DE-AC27-10RV15051 Conformed thru Contract Modification No. 127 J-1 PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS SECTION J LIST OF ATTACHMENTS Table of Contents ATTACHMENT 1: DOE DIRECTIVES APPLICABLE TO THE 222-S LAB ............................................... 2 ATTACHMENT 2: 222-S LABORATORY DOCUMENTED SAFETY ANALYSIS ..................................... 5 DSA HNF-12125.pdf

  11. Non-Federal Participation in AC Intertie : Final Environmental Impact Statement. Volume 1: Environmental Analysis.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1994-01-01

    Bonneville Power Administration (BPA) is considering action in two areas: (1) non-Federal access to the AC Intertie, and, (2) BPA Intertie marketing. BPA`s preferred alternative for non-Federal access is the Capacity Ownership alternative combined with the Increased Assured Delivery -- Access for Non-Scheduling Utilities alternative; the preferred alternative for BPA Intertie marketing is the Federal Marketing and Joint Ventures alternative. BPA considered these two areas previously in its Intertie Development and Use EIS of April 1988. The EIS resulted in BPA decisions to participate in the construction of the Third AC Intertie, to allow non-Federal access to BPA`s share of the Pacific Northwest-Pacific Southwest (PNW-PSW) Intertie (AC and DC lines) pursuant to a Long-Term Intertie Access Policy (LTIAP), and to pursue BPA`s export marketing alternative. The decision on allowing direct financial non-Federal participation in the Third AC line was deferred to a later, separate process, examined here. Also, BPA`s export marketing objectives must now be examined in view of changed operations of Columbia River hydro facilities for improved fish survival.

  12. Observation of multi-scale oscillation of laminar lifted flames with low-frequency AC electric fields

    SciTech Connect (OSTI)

    Ryu, S.K.; Kim, Y.K.; Kim, M.K.; Won, S.H. [School of Mechanical and Aerospace Engineering, Seoul National University, Seoul 151-742 (Korea); Chung, S.H. [Clean Combustion Research Center, King Abdullah University of Science and Technology, Thuwal (Saudi Arabia)

    2010-01-15

    The oscillation behavior of laminar lifted flames under the influence of low-frequency AC has been investigated experimentally in coflow jets. Various oscillation modes were existed depending on jet velocity and the voltage and frequency of AC, especially when the AC frequency was typically smaller than 30 Hz. Three different oscillation modes were observed: (1) large-scale oscillation with the oscillation frequency of about 0.1 Hz, which was independent of the applied AC frequency, (2) small-scale oscillation synchronized to the applied AC frequency, and (3) doubly-periodic oscillation with small-scale oscillation embedded in large-scale oscillation. As the AC frequency decreased from 30 Hz, the oscillation modes were in the order of the large-scale oscillation, doubly-periodic oscillation, and small-scale oscillation. The onset of the oscillation for the AC frequency smaller than 30 Hz was in close agreement with the delay time scale for the ionic wind effect to occur, that is, the collision response time. Frequency-doubling behavior for the small-scale oscillation has also been observed. Possible mechanisms for the large-scale oscillation and the frequency-doubling behavior have been discussed, although the detailed understanding of the underlying mechanisms will be a future study. (author)

  13. Review of the design and performance features of hvdc systems connected to low short circuit ratio ac systems

    SciTech Connect (OSTI)

    Thallam, R.S. )

    1992-10-01

    The design and performance of an HVdc system is significantly impacted by the relative strength of the ac system to which it is connected. In this paper, design and performance features of ten HVdc systems are discussed. All of these systems are connected to ac systems that are relatively weak compared to the rating of the dc system. Six of these systems are back-to-back, two are overhead lines, and two are undersea cable connections. AC and dc system interaction problems and how they are addressed in the design and specification of each of these systems, are described.

  14. DOE 10 CFR Part 431 EERE-2010-BT-TP-0036 RIN 1904-AC-38 Submission of

    Energy Savers [EERE]

    Comments by Howe Corporation | Department of Energy 0 CFR Part 431 EERE-2010-BT-TP-0036 RIN 1904-AC-38 Submission of Comments by Howe Corporation DOE 10 CFR Part 431 EERE-2010-BT-TP-0036 RIN 1904-AC-38 Submission of Comments by Howe Corporation Comments to the following DOE Proposed Rules: 10 CFR Part 431 [Docket No. EERE-2010-BT-TP-0036] RIN 1904-AC38 Energy Efficiency Program for Certain Commercial and Industrial Equipment: Test Procedures for Automatic Commercial Ice Makers PDF icon

  15. Effect of the valence electron concentration on the bulk modulus and chemical bonding in Ta{sub 2}AC and Zr{sub 2}AC (A=Al, Si, and P)

    SciTech Connect (OSTI)

    Schneider, Jochen M.; Music, Denis; Sun Zhimei

    2005-03-15

    We have studied the effect of the valence electron concentration, on the bulk modulus and the chemical bonding in Ta{sub 2}AC and Zr{sub 2}AC (A=Al, Si, and P) by means of ab initio calculations. Our equilibrium volume and the hexagonal ratio (c/a) agree well (within 2.7% and 1.2%, respectively) with previously published experimental data for Ta{sub 2}AlC. The bulk moduli of both Ta{sub 2}AC and Zr{sub 2}AC increase as Al is substituted with Si and P by 13.1% and 20.1%, respectively. This can be understood since the substitution is associated with an increased valence electron concentration, resulting in band filling and an extensive increase in cohesion.

  16. An Annotated Bibliography of High-Voltage Direct-Current Transmission and Flexible AC Transmission (FACTS) Devices, 1991-1993.

    SciTech Connect (OSTI)

    Litzenberger, Wayne; Lava, Val

    1994-08-01

    References are contained for HVDC systems, converter stations and components, overhead transmission lines, cable transmission, system design and operations, simulation of high voltage direct current systems, high-voltage direct current installations, and flexible AC transmission system (FACTS).

  17. AuRu/AC as an effective catalyst for hydrogenation reactions

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Villa, Alberto; Chan-Thaw, Carine E.; Campisi, Sebastiano; Bianchi, Claudia L.; Wang, Di; Kotula, Paul G.; Kübel, Christian; Prati, Laura

    2015-03-23

    AuRu bimetallic catalysts have been prepared by sequential deposition of Au on Ru or vice versa obtaining different nanostructures: when Ru has been deposited on Au, a Aucore–Rushell has been observed, whereas the deposition of Au on Ru leads to a bimetallic phase with Ru enrichment on the surface. In the latter case, the unexpected Ru enrichment could be attributed to the weak adhesion of Ru on the carbon support, thus allowing Ru particles to diffuse on Au particles. Both structures result very active in catalysing the liquid phase hydrogenolysis of glycerol and levulinic acid but the activity, the selectivitymore » and the stability depend on the structure of the bimetallic nanoparticles. Ru@Au/AC core–shell structure mostly behaved as the monometallic Ru, whereas the presence of bimetallic AuRu phase in Au@Ru/AC provides a great beneficial effect on both activity and stability.« less

  18. Kondo physics in the single-electron transistor with ac driving

    SciTech Connect (OSTI)

    Nordlander, Peter; Wingreen, Ned S.; Meir, Yigal; Langreth, David C.

    2000-01-15

    Using a time-dependent Anderson Hamiltonian, a quantum dot with an ac voltage applied to a nearby gate is investigated. A rich dependence of the linear response conductance on the external frequency and driving amplitude is demonstrated. At low frequencies a sufficiently strong ac potential produces sidebands of the Kondo peak in the spectral density of the dot, and a slow, roughly logarithmic decrease in conductance over several decades of frequency. At intermediate frequencies, the conductance of the dot displays an oscillatory behavior due to the appearance of Kondo resonances of the satellites of the dot level. At high frequencies, the conductance of the dot can vary rapidly due to the interplay between photon-assisted tunneling and the Kondo resonance. (c) 2000 The American Physical Society.

  19. AuRu/AC as an effective catalyst for hydrogenation reactions

    SciTech Connect (OSTI)

    Villa, Alberto; Chan-Thaw, Carine E.; Campisi, Sebastiano; Bianchi, Claudia L.; Wang, Di; Kotula, Paul G.; Kbel, Christian; Prati, Laura

    2015-03-23

    AuRu bimetallic catalysts have been prepared by sequential deposition of Au on Ru or vice versa obtaining different nanostructures: when Ru has been deposited on Au, a AucoreRushell has been observed, whereas the deposition of Au on Ru leads to a bimetallic phase with Ru enrichment on the surface. In the latter case, the unexpected Ru enrichment could be attributed to the weak adhesion of Ru on the carbon support, thus allowing Ru particles to diffuse on Au particles. Both structures result very active in catalysing the liquid phase hydrogenolysis of glycerol and levulinic acid but the activity, the selectivity and the stability depend on the structure of the bimetallic nanoparticles. Ru@Au/AC coreshell structure mostly behaved as the monometallic Ru, whereas the presence of bimetallic AuRu phase in Au@Ru/AC provides a great beneficial effect on both activity and stability.

  20. Clock Controller For Ac Self-Timing Analysis Of Logic System

    DOE Patents [OSTI]

    Lo, Tinchee (Fishkill, NY); Flanagan, John D. (Rhinebeck, NY)

    2004-05-18

    A clock controller and clock generating method are provided for AC self-test timing analysis of a logic system. The controller includes latch circuitry which receives a DC input signal at a data input, and a pair of continuous out-of-phase clock signals at capture and launch clock inputs thereof. The latch circuitry outputs two overlapping pulses responsive to the DC input signal going high. The two overlapping pulses are provided to waveform shaper circuitry which produces therefrom two non-overlapping pulses at clock speed of the logic system to be tested. The two non-overlapping pulses are a single pair of clock pulses which facilitate AC self-test timing analysis of the logic system.

  1. Contract Number DE-AC27-08RV14800 Continuation Page, Modification 138

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract Number DE-AC27-08RV14800 Continuation Page, Modification 138 Attachment 1 DE-AC27-08RV14800, MODIFICATION 138 Replacement Pages (Total: One Hundred Twenty-Five (125) including this Cover Page) * Section H, Pages H-4 and H-24 * Section J, Table of Contents, Page J-1 * Section J, Attachment J.2, Pages J.2-4 thru J.2-7 and J.2.9 * Section J, Attachment J.10, Pages J.10-1 thru J.10-20 * Section J, Attachment J.13, Pages J.13-1 thru J.13-29 * Section J, Attachment J.14, Pages J.14-1 thru

  2. Switch contact device for interrupting high current, high voltage, AC and DC circuits

    DOE Patents [OSTI]

    Via, Lester C.; Witherspoon, F. Douglas; Ryan, John M.

    2005-01-04

    A high voltage switch contact structure capable of interrupting high voltage, high current AC and DC circuits. The contact structure confines the arc created when contacts open to the thin area between two insulating surfaces in intimate contact. This forces the arc into the shape of a thin sheet which loses heat energy far more rapidly than an arc column having a circular cross-section. These high heat losses require a dramatic increase in the voltage required to maintain the arc, thus extinguishing it when the required voltage exceeds the available voltage. The arc extinguishing process with this invention is not dependent on the occurrence of a current zero crossing and, consequently, is capable of rapidly interrupting both AC and DC circuits. The contact structure achieves its high performance without the use of sulfur hexafluoride.

  3. Construction of AC Motor Controllers for NOvA Experiment Upgrades

    SciTech Connect (OSTI)

    Cooley, Patrick; ,

    2011-08-04

    I have been constructing Alternating Current (AC) motor controllers for manipulation of particle beam detectors. The capability and reliability of these motor controllers are essential to the Laboratory's mission of accurate analysis of the particle beam's position. The device is moved in and out of the beam's path by the motor controller followed by the Neutrinos at the Main Injector Off-Axis {nu}{sub e} Appearance (NOvA) Experiment further down the beam pipe. In total, I built and tested ten ac motor controllers for new beam operations in the NOvA experiment. These units will prove to be durable and provide extremely accurate beam placement for NOvA Experiment far into the future.

  4. The correction of linear lattice gradient errors using an AC dipole

    SciTech Connect (OSTI)

    Wang,G.; Bai, M.; Litvinenko, V.N.; Satogata, T.

    2009-05-04

    Precise measurement of optics from coherent betatron oscillations driven by ac dipoles have been demonstrated at RHIC and the Tevatron. For RHIC, the observed rms beta-beat is about 10%. Reduction of beta-beating is an essential component of performance optimization at high energy colliders. A scheme of optics correction was developed and tested in the RHIC 2008 run, using ac dipole optics for measurement and a few adjustable trim quadruples for correction. In this scheme, we first calculate the phase response matrix from the. measured phase advance, and then apply singular value decomposition (SVD) algorithm to the phase response matrix to find correction quadruple strengths. We present both simulation and some preliminary experimental results of this correction.

  5. National Fuel Cell Bus Program: Accelerated Testing Evaluation Report and Appendices, Alameda-Contra Costa Transit District (AC Transit)

    SciTech Connect (OSTI)

    Chandler, K.; Eudy, L.

    2009-01-01

    This is an evaluation of hydrogen fuel cell transit buses operating at AC Transit in revenue service since March 20, 2006 compared to similar diesel buses operating from the same depot. This evaluation report includes results from November 2007 through October 2008. Evaluation results include implementation experience, fueling station operation, fuel cell bus operations at Golden Gate Transit, and evaluation results at AC Transit (bus usage, availability, fuel economy, maintenance costs, and roadcalls).

  6. National Fuel Cell Bus Program: Accelerated Testing Evaluation Report #2, Alameda-Contra Costa Transit District (AC Transit) and Appendices

    SciTech Connect (OSTI)

    Eudy, L.; Chandler, K.

    2010-06-01

    This is an evaluation of hydrogen fuel cell transit buses operating at AC Transit in revenue service since March 20, 2006, comparing similar diesel buses operating from the same depot. It covers November 2007 through February 2010. Results include implementation experience, fueling station operation, evaluation results at AC Transit (bus usage, availability, fuel economy, maintenance costs, and road calls), and a summary of achievements and challenges encountered during the demonstration.

  7. SUBMERGED GRAVEL SCRUBBER DEMONSTRATION AS A PASSIVE AIR CLEANER FOR CONTAINMENT VENTING AND PURGING WITH SODIUM AEROSOLS -- CSTF TESTS AC7 - AC10

    SciTech Connect (OSTI)

    HILLIARD, R K.; MCCORMACK, J D.; POSTMA, A K.

    1981-11-01

    Four large-scale air cleaning tests (AC7 - AC10) were performed in the Containment Systems Test Facility (CS'lF) to demonstrate the performance of a Submerged Gravel Scrubber for cleaning the effluent gas from a vented and purged breeder reactor containment vessel. The test article, comprised of a Submerged Gravel Scrubber (SGS) followed by a high efficiency fiber demister, had a design gas flow rate of 0.47 m{sup 3}/s (1000 ft{sup 3}/min) at a pressure drop of 9.0 kPa (36 in. H{sub 2}O). The test aerosol was sodium oxide, sodium hydroxide, or sodium carbonate generated in the 850-m{sup 3} CSTF vessel by continuously spraying sodium into the air-filled vessel while adding steam or carbon dioxide. Approximately 4500 kg (10,000 lb) of sodium was sprayed over a total period of 100 h during the tests. The SGS/Demister system was shown to be highly efficient (removing ~99.98% of the entering sodium aerosol mass), had a high mass loading capacity, and operated in a passive manner, with no electrical requirement. Models for predicting aerosol capture, gas cooling, and pressure drop are developed and compared with experimental results.

  8. Degradation of silicon ac-coupled microstrip detectors induced by radiation

    SciTech Connect (OSTI)

    Bacchetta, N.; Gotra, Yu.; Bisello, D.; Canali, C.; Fuochi, P.G.; Paccagnella, A.; Verzellesi, G.

    1993-12-01

    Results are presented showing the radiation response of ac-coupled FOXFET biased microstrip detectors and related test patterns to be used in the microvertex detector of the CDF experiment at Fermi National Laboratory. Radiation tolerance of detectors to gamma and proton irradiation has been tested and the radiation induced variations of the dc electrical parameters have been analyzed. Long term post-irradiation behavior of detector characteristics have been studied, and the relevant room temperature annealing phenomena have been discussed.

  9. Oak Ridge Associated Universities DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Universities DE-AC05-06OR23100 Modification 0515 PART III LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS SECTION J - LIST OF ATTACHMENTS ATTACHMENT F - KEY PERSONNEL (Revised 1/30/2015) NAME TITLE Harry A. (Andy) Page ORISE Director Donna L. Cragle Director, Health, Energy, and Environment David Hackemeyer Director, National Security Dean M. Evasius Director, Scientific Assessment and Workforce Development J. Phil Andrews Director, Business Operations and Chief Financial Officer Ivan A.

  10. Docket No. EERE-2012-BT-TP-0046; RIN 1904-AC52 Ex parte

    Energy Savers [EERE]

    communication Meeting of May 16, 2013 | Department of Energy Ex parte communication Meeting of May 16, 2013 Docket No. EERE-2012-BT-TP-0046; RIN 1904-AC52 Ex parte communication Meeting of May 16, 2013 This memorandum for the record provides a summary of a meeting involving representatives of the Consumer Electronics Association and National Cable & Telecommunications Association with Dr. David Danielson, Assistant Secretary for Energy Efficiency and Renewable Energy. PDF icon CEA memo

  11. Alameda-Contra Costa Transit District (AC Transit) Fuel Cell Transit Buses:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Third Evaluation Report - Appendices | Department of Energy Third Evaluation Report - Appendices Alameda-Contra Costa Transit District (AC Transit) Fuel Cell Transit Buses: Third Evaluation Report - Appendices This report describes operations at Alameda-Contra Costa Transit district for three protoype fuel cell buses and six diesel buses operating from the same location. PDF icon 43545-2.pdf More Documents & Publications Connecticut Transit (CTTRANSIT) Fuel Cell Transit Bus: Second

  12. Alameda-Contra Costa Transit District (AC Transit) Fuel Cell Transit Buses:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Third Evaluation Report | Department of Energy Report Alameda-Contra Costa Transit District (AC Transit) Fuel Cell Transit Buses: Third Evaluation Report This report describes operations at Alameda-Contra Costa Transit district for three protoype fuel cell buses and six diesel buses operating from the same location. PDF icon 43545-1.pdf More Documents & Publications SunLine Transit Agency Fuel Cell Transit Bus: Fifth Evaluation Report SunLine Transit Agency Hydrogen-Powered Transit

  13. PPPL engineers design and build state-of-the-art controller for AC to DC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    converter that manages plasma in upgraded fusion machine | Princeton Plasma Physics Lab PPPL engineers design and build state-of-the-art controller for AC to DC converter that manages plasma in upgraded fusion machine By Raphael Rosen March 7, 2016 Tweet Widget Google Plus One Share on Facebook PPPL scientists Robert Mozulay and Weiguo Que (Photo by Hans Schneider) PPPL scientists Robert Mozulay and Weiguo Que Gallery: A digital firing generator installed in NSTX-U (Photo by Hans Schneider)

  14. Contract No. DE-AC06-97RL13184, Modification 158 Attachment J-1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AC06-97RL13184, Modification 158 Attachment J-1 Page 1 of 9 WD 05-2569 (Rev.-14) was first posted on www.wdol.gov on 06/19/2012 ************************************************************************************ REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION By direction of the Secretary of Labor | WAGE AND HOUR DIVISION | WASHINGTON D.C. 20210 | | | | Wage Determination No.: 2005-2569 Diane C. Koplewski Division

  15. Joint BioEnergy Institute Oxime-NIMS Work Featured on the Cover of ACS

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Chemical Biology Oxime-NIMS Work Featured on the Cover of ACS Chemical Biology - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing

  16. by Lawrence Livermore National Laboratory under Contract DE-AC52-07NA27344.

    Broader source: Energy.gov (indexed) [DOE]

    work was performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under Contract DE-AC52-07NA27344. Richard A. Rankin Director, Industrial Partnerships Office and Interim Director Economic Development Office 22 May 2015 LLNL-PRES-670964 Lawrence Livermore National Laboratory LLNL-PRES-670964 From a mission-focus perspective, there are four areas where the nature of the security mission means interacting with private sector owners, and operators: *

  17. Modification No. M089 Contract No. DE-AC04-00AL66620

    National Nuclear Security Administration (NNSA)

    9 Contract No. DE-AC04-00AL66620 Attachment 1 PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS SECTION J - LIST OF ATTACHMENTS APPENDIX D - KEY PERSONNEL May 2, 2005 Pursuant to the clause entitled "Key Personnel," the following positions are considered to be essential to work being performed. General Manager Michael B. Mallory Deputy General Manager Dan J. Swaim Director of Directed Stockpile Programs Dominick Palamara Director of RTBF Programs Michael A. Sabbe

  18. Sandia Corporation Contract No. DE-AC04-94AL85000

    National Nuclear Security Administration (NNSA)

    Corporation Contract No. DE-AC04-94AL85000 Modification No. 585 Attachment 1 Part III - Section J Appendix D Key Personnel September 11, 2015 (Modification No. 585) The Contractor's employees identified below are determined to be necessary for the successful performance of this Contract. The purpose of this listing is to identify those employees whose initial assignment, reassignment, or replacement shall be subject to the approval of the Contracting Officer, pursuant to the Contract Clause

  19. Sandia Corporation, Contract No. DE-AC04-94AL85000 Modification No. M537

    National Nuclear Security Administration (NNSA)

    Corporation, Contract No. DE-AC04-94AL85000 Modification No. M537 Attachment 1 Part III - Section J Appendix G List of Applicable Directives and NNSA Policy Letters In addition to the list of applicable directives referenced below, the contractor shall also comply with supplementary directives (e.g., manuals), which are invoked by a Contractor Requirements Document (CRD) attached to a directive referenced below. This List excludes directives that have been granted an exemption from the CRD in

  20. Rotor dynamic analysis of GCEP (Gas Centrifuge Enrichment Plant) Tails Withdrawal Test Facility AC-12 compressor

    SciTech Connect (OSTI)

    Spencer, J.W.

    1982-01-22

    The reliable operation of the centrifugal compressors utilized in the gaseous diffusion process is of great importance due to the critical function of these machines in product and tails withdrawal, cascade purge and evacuation processes, the purge cascade and product booster applications. The same compressors will be used in equally important applications within the Gas Centrifuge Enrichment Plant (GCEP). In response to concern over the excessive vibration exhibited by the AC-12 compressor in the No. 3 position of the GCEP Tails Withdrawal Test Facility, a rotor-bearing dynamic analysis was performed on the compressor. This analysis included the acquisition and reduction of compressor vibration data, characterization and modeling of the rotorbearing system, a computer dynamic study, and recommendations for machine modification. The compressor dynamic analysis was performed for rotor speeds of 9000 rpm and 7200 to 7800 rpm, which includes all possible opreating speeds of the compressor in the GCEP Test Facility. While the analysis was performed on this particular AC-12 compressor, the results should be pertinent to other AC-12 applications as well. Similar diagnostic and analytical techniques can be used to evaluate operation of other types of centrifugal compressors.

  1. Comparison of the Accuracy and Speed of Transient Mobile A/C System Simulation Models: Preprint

    SciTech Connect (OSTI)

    Kiss, T.; Lustbader, J.

    2014-03-01

    The operation of air conditioning (A/C) systems is a significant contributor to the total amount of fuel used by light- and heavy-duty vehicles. Therefore, continued improvement of the efficiency of these mobile A/C systems is important. Numerical simulation has been used to reduce the system development time and to improve the electronic controls, but numerical models that include highly detailed physics run slower than desired for carrying out vehicle-focused drive cycle-based system optimization. Therefore, faster models are needed even if some accuracy is sacrificed. In this study, a validated model with highly detailed physics, the 'Fully-Detailed' model, and two models with different levels of simplification, the 'Quasi-Transient' and the 'Mapped- Component' models, are compared. The Quasi-Transient model applies some simplifications compared to the Fully-Detailed model to allow faster model execution speeds. The Mapped-Component model is similar to the Quasi-Transient model except instead of detailed flow and heat transfer calculations in the heat exchangers, it uses lookup tables created with the Quasi-Transient model. All three models are set up to represent the same physical A/C system and the same electronic controls. Speed and results of the three model versions are compared for steady state and transient operation. Steady state simulated data are also compared to measured data. The results show that the Quasi-Transient and Mapped-Component models ran much faster than the Fully-Detailed model, on the order of 10- and 100-fold, respectively. They also adequately approach the results of the Fully-Detailed model for steady-state operation, and for drive cycle-based efficiency predictions

  2. DE-AC26-01NT41007 | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The Mallik 2002 Consortium: Drilling and Testing a Gas Hydrate Well DE-AC26-01NT41007 Last Reviewed 02/05/2010 photo of the drillsite at the Mallik 5L-39 location Drillsite at Mallik 5L-38 location courtesy Geological Survey of Canada Project Goal Obtain information that can be utilized to develop gas hydrate computer production models. Performer Geological Survey of Canada - manager of consortium Location Ottawa, ON K1A -0E8 Background The Mallik Gas Hydrate Research Well Project began in 1998,

  3. DE-AC27-10RV15051 Modification A001

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DE-AC27-10RV15051 Modification A001 Page 2 of 12 The purpose of this change order is to (1) add American Recovery and Reinvestment Act (ARRA) tasks (2) obligate ARRA funding, (3) incorporate applicable ARRA clauses. 1. CHANGE ORDER This change order modification is issued pursuant to contract clause I-75, entitled FAR 52.243-2 - Changes - Cost-Reimbursement (Aug 1987), Alternate I (Apr 1984). Under this authority the contractor is directed to proceed with performance of ARRA tasks as outlined

  4. DE-AC27-I1ORVI15051 Modification A009

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    I1ORVI15051 Modification A009 Page 2 of 6 A. The purpose of this modification is to make an equitable adjustment to contract cost relevant to transition cost and the stop work order dated November 27, 2009, and modify the period of performance as detailed below: Reference: 1. ATL Letter dated May 24, 2010, from J.G. Hwang, ATL, to D.A. Gallegos, ORP, "CLIN 1 TRANSITION COST OVERRUN PROPOSAL (Contract Number DE-AC27-1I0RV 1505 1) Background: The contract was awarded on November 20, 2009, and

  5. DOE Contract Number DE-AC05-060R231

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE Contract Number DE-AC05-060R231 00 Modification M045 Oak Ridge Associated Universities Page 2 of2 14. Description of AmendmenVModification: The purpose of this modification is to accomplish the following: 1) Advise you of changes in 10 CFR 707 which is invoked by DEAR 970.5223-4: 1) the definition of Testing Designated Positions (TOPs) now includes all contractor personnel with security clearances; 2) the percent of personnel to be randomly tested on an annual basis has been decreased from

  6. THE HST/ACS COMA CLUSTER SURVEY. II. DATA DESCRIPTION AND SOURCE CATALOGS

    SciTech Connect (OSTI)

    Hammer, Derek; Verdoes Kleijn, Gijs; Den Brok, Mark; Peletier, Reynier F.; Hoyos, Carlos; Balcells, Marc; Aguerri, Alfonso L.; Ferguson, Henry C.; Goudfrooij, Paul; Carter, David; Guzman, Rafael; Smith, Russell J.; Lucey, John R.; Graham, Alister W.; Trentham, Neil; Peng, Eric; Puzia, Thomas H.; Jogee, Shardha; Batcheldor, Dan; Bridges, Terry J.

    2010-11-15

    The Coma cluster, Abell 1656, was the target of an HST-ACS Treasury program designed for deep imaging in the F475W and F814W passbands. Although our survey was interrupted by the ACS instrument failure in early 2007, the partially completed survey still covers {approx}50% of the core high-density region in Coma. Observations were performed for 25 fields that extend over a wide range of cluster-centric radii ({approx}1.75 Mpc or 1{sup 0}) with a total coverage area of 274 arcmin{sup 2}. The majority of the fields are located near the core region of Coma (19/25 pointings) with six additional fields in the southwest region of the cluster. In this paper, we present reprocessed images and SEXTRACTOR source catalogs for our survey fields, including a detailed description of the methodology used for object detection and photometry, the subtraction of bright galaxies to measure faint underlying objects, and the use of simulations to assess the photometric accuracy and completeness of our catalogs. We also use simulations to perform aperture corrections for the SEXTRACTOR Kron magnitudes based only on the measured source flux and its half-light radius. We have performed photometry for {approx}73,000 unique objects; approximately one-half of our detections are brighter than the 10{sigma} point-source detection limit at F814W = 25.8 mag (AB). The slight majority of objects (60%) are unresolved or only marginally resolved by ACS. We estimate that Coma members are 5%-10% of all source detections, which consist of a large population of unresolved compact sources (primarily globular clusters but also ultra-compact dwarf galaxies) and a wide variety of extended galaxies from a cD galaxy to dwarf low surface brightness galaxies. The red sequence of Coma member galaxies has a color-magnitude relation with a constant slope and dispersion over 9 mag (-21 < M {sub F814W} < -13). The initial data release for the HST-ACS Coma Treasury program was made available to the public in 2008 August. The images and catalogs described in this study relate to our second data release.

  7. Contract No. DE-AC02-07CH11358 Section E Contract Modification No. 133

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    E Contract Modification No. 133 i PART I SECTION E INSPECTION AND ACCEPTANCE PAGE NO. E.1 - FAR 52.246-9 - INSPECTION OF RESEARCH AND DEVELOPMENT (SHORT FORM) (APR 1984) E-1 E.2 - CERTIFICATION E-1 Contract No. DE-AC02-07CH11358 Section E Contract Modification No.133 E-1 PART I SECTION E - INSPECTION AND ACCEPTANCE E.1 - FAR 52.246-9 - INSPECTION OF RESEARCH AND DEVELOPMENT (SHORT FORM) (APR 1984) The Government has the right to inspect and evaluate the work performed or being performed under

  8. Contract No. DE-AC02-07CH11358 Section F Contract Modification No. 0139

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    F Contract Modification No. 0139 i PART I SECTION F DELIVERIES OR PERFORMANCE TABLE OF CONTENTS PAGE NO. F.1 - PERIOD OF PERFORMANCE F-1 F.2 - AWARD TERM INCENTIVE (SPECIAL) F-1 F.3 - FAR 52.242-15 - STOP WORK ORDER (AUG 1989) - ALTERNATE I (APR 1984) F-4 F.4 - STOP WORK AND SHUTDOWN AUTHORITY F-5 F.5 - PRINCIPAL PLACE OF PERFORMANCE F-5 Contract No. DE-AC02-07CH11358 Section F Contract Modification No. 0139 F-1 PART I SECTION F - DELIVERIES OR PERFORMANCE F.1 - PERIOD OF PERFORMANCE (a) This

  9. Contract No. DE-AC02-07CH11358 Section J Appendix H

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Section J Appendix H Modification 0171 ATTACHMENT J.8 APPENDIX H SMALL BUSINESS SUBCONTRACTING PLAN Applicable to the Operation of AMES Laboratory Contract No. DE-AC02-07CH11358 A mAmes Laboratory Croltfng Motlr/6/o A E*orpy Sofulfono U.B . DEPAR'fld.£NT OF BNKD.OY This subcontracting plan was submitted by: Signature: Typed Name: Andrea Spiker Title: Purchasing Manag r Date Signed: IO(;J. }~ OJ'f I I Phone No.: 515-294-6738 Approval: Agency: Signature: Typed Name: Title: Contracting Officer ,

  10. Contract Number DE-AC27-08RV14800 Continuation Page, Modification 360

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Number DE-AC27-08RV14800 Continuation Page, Modification 360 Page 2 of 4 The following changes are hereby incorporated into the contract under the authority of Federal Acquisition Regulation (FAR) 52.243-2 Changes-Cost Reimbursement, at no additional cost to the Government. 1. Update Contract Section H-15(f), Key Personnel for this Contract, to update the list as follows: FROM: Name Position Mr. Lyden David Olson TOC Project Manager Mr. Robert E. Wilkinson Manager, ESH&Q Mr. Doug Greenwell

  11. ac response of thin superconductors in the flux-creep regime

    SciTech Connect (OSTI)

    Gurevich, A. [Applied Superconductivity Center, University of Wisconsin, Madison, Wisconsin 53706 (United States)] [Applied Superconductivity Center, University of Wisconsin, Madison, Wisconsin 53706 (United States); Brandt, E.H. [Max Planck Institute fuer Metallforschung, D-70506 Stuttgart (Germany)] [Max Planck Institute fuer Metallforschung, D-70506 Stuttgart (Germany)

    1997-05-01

    We calculate both analytically and numerically the ac susceptibility {chi}({omega}) and the nonlinear electromagnetic response of thin superconductor strips and disks of constant thickness in a perpendicular time-dependent magnetic field B{sub a}(t)=B{sub 0}cos{omega}t, taking account of the strong nonlinearity of the voltage-current characteristics below the irreversibility line. We consider integral equations of nonlinear nonlocal flux diffusion for a wide class of thermally activated creep models. It is shown that thin superconductors, despite being fully in the critical state, exhibit a universal Meissner-like electromagnetic response in the dissipative flux-creep regime. The expression for the linear ac susceptibility during flux creep appears to be similar to the susceptibility of Ohmic conductors, but with the relaxation time constant replaced by the time t elapsed after flux creep has started. This result is independent of any material parameter or temperature or dc field. For {omega}t{gt}1, we obtain {chi}({omega}){approx}{minus}1+pln(qi{omega}t)/(i{omega}t), where p and q are constants. Above a critical ac amplitude B{sub 0}=B{sub l}, the local response of the electric field becomes nonlinear, and there are two distinctive nonlinear regimes at B{sub 0}{gt}B{sub l}, where B{sub l}{approximately}s(d/a){sup 1/2}B{sub p}, B{sub p} is a characteristic field of full flux penetration, s(T,B)={vert_bar}dlnj/dlnt{vert_bar} is the dimensionless flux-creep rate and d and a are the sample thickness and width, respectively. For B{sub l}{lt}B{sub 0}{lt}B{sub h}({omega}) the response of the electric field is strongly nonlinear but nonhysteretic, since the ac field B{sub a}(t) does not cause a periodic inversion of the critical state. As a result, the magnetic moment exhibits a Meissner-like {ital nondissipative} response, in stark contrast to the Bean model. (Abstract Truncated)

  12. AC-magnetotransport of a 2DEG in the quantum Hall regime

    SciTech Connect (OSTI)

    Hernndez, C.; Chaubet, C.

    2014-05-15

    In this paper we present an ac-magneto-transport study of a two-dimensional electron gas (2DEG) in the quantum Hall effect (QHE) regime, for frequencies in the range [100Hz, 1MHz]. We present a new approach to understand admittance measurements based in the Landauer-Buttiker formalism for QHE edge channels and taking into account the capacitance and the topology of the cables connected to the contacts used in the measurements. Our model predicts an universal behavior with the a-dimensional parameter RC? where R is the 2 wires resistance of the 2DEG, C the capacitance cables and the angular frequency, in agreement with experiments.

  13. Contract No. DE-AC02-09CH11466 Section F

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Modification No. 0164 Contract No. DE-AC02-09CH11466 Section F i PART I SECTION F DELIVERIES OR PERFORMANCE TABLE OF CONTENTS CLAUSE NO. TITLE OF CLAUSE F.1 PERIOD OF PERFORMANCE (Revised by Prime Contract Modification 041 - 07/13/2010; 0137 - 10/28/2013; 0164 - 08/07/2014) F.2 AWARD TERM INCENTIVE (SPECIAL) F.3 FAR 52.242-15 - STOP WORK ORDER (AUG 1989) ALTERNATE I (APR 1984) F.4 STOP WORK AND SHUTDOWN AUTHORITY F.5 PRINCIPAL PLACE OF PERFORMANCE Modification No. 0164 Contract No.

  14. PPPL engineers design and build state-of-the-art controller for AC to DC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    converter that manages plasma in upgraded fusion machine | Princeton Plasma Physics Lab PPPL engineers design and build state-of-the-art controller for AC to DC converter that manages plasma in upgraded fusion machine By Raphael Rosen March 7, 2016 Tweet Widget Google Plus One Share on Facebook PPPL scientists Robert Mozulay and Weiguo Que (Photo by Hans Schneider) PPPL scientists Robert Mozulay and Weiguo Que Gallery: One of the digital firing generators installed in NSTX-U (Photo by Hans

  15. Microsoft Word - DE-AC06-09RL15009 Section B.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    B Page B-1 Section B Supplies or Services and Prices Table of Contents Section Title Page No. B.1 Workers' Compensation Claims Administrative Services B-2 B.2 Obligation of Funds and Limitation of Government Financial Liability B-2 B.3 Schedule B-2 B.4 Reimbursable Expenses B-4 B.5 Payment of Performance Based Fee B-4 Workers' Compensation Claims Services Part I Contract No. DE-AC06-09RL15009 Section B Page B-2 B.1 Workers' Compensation Claims Administrative Services This is a fixed-unit price

  16. Microsoft Word - DE-AC06-09RL15009 Section D.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    D Page D-1 Section D Packaging and Marking Table of Contents Section Title Page No. D.1 Packaging D-2 D.2 Marking D-2 Workers' Compensation Claims Services Part I Contract No. DE-AC06-09RL15009 Section D Page D-2 D.1 Packaging Preservation, packaging, and packing for shipment or mailing of all work delivered hereunder shall be in accordance with good commercial practices and adequate to ensure acceptance by common carrier and safe transportation at the most economical rate(s). D.2 Marking a.

  17. Microsoft Word - DE-AC06-09RL15009 Section F.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    F Page F-1 Section F Deliveries and Performance Table of Contents Section Title Page No. F.1 Period of Performance F-2 F.2 Principal Place of Performance F-2 F.3 Reporting Requirements F-2 F.4 FAR 52.242-15 Stop-Work Order. (AUG 1989) F-4 F.5 FAR 52.242-17 Government Delay of Work. (APR 1984) F-5 Workers' Compensation Claims Services Part I Contract No.DE-AC06-09RL15009 Section F Page F-2 F.1 Period of Performance The period of performance (exclusive of the Transition Period) for the work

  18. Microsoft Word - DE-AC06-09RL15009 Section G.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    G Page G-1 Section G Contract Administration Plan Table of Contents Section Title Page No. G.1 Contract Administration G-2 G.2 Billing Instructions G-2 G.3 Modification Authority G-3 G.4 DEAR 952.242-70 Technical Direction (DEC 2000) G-3 G.5 Administrative Reporting Requirements G-5 Workers' Compensation Claims Services Part I Contract No. DE-AC06-09RL15009 Section G Page G-2 G.1 Contract Administration The DOE Contracting Officer and correspondence address is: Andrew H. Wirkkala, Contracting

  19. Microsoft Word - DE-AC06-09RL15009 Section J.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    III Contract No. DE-AC06-09RL15009 Section J Page J-1 Section J Part III - List of Attachments Table of Contents Section Title Page No. J.1 Covered Site Contractors/Sub-Contractors J-2 J.2 Hardware and Software System Requirements J-4 J.3 Wage Determination No. 2005-2569, Revision No. 8 J-5 J.4 Legal Management Plan J-16 (to be inserted 60 days after award) J.5 Continuity of Operations Plan J-17 (to be inserted 60 days after award) J.6 List of Applicable DOE Directives and Contractor

  20. Mission Support Contract Section J Contract No. DE-AC06-09RL14728

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    J-7-1 ATTACHMENT J-7 SMALL DISADVANTAGED BUSINESS PARTICIPATION PROGRAM TARGETS Mission Support Contract Section J Contract No. DE-AC06-09RL14728 J-7-2 SMALL DISADVANTAGED BUSINESS PARTICIPATION PROGRAM TARGETS A. Mission Support Alliance, LLC NAICS Co d e De s c rip tio n o f NAICS S u b s e c to rs S DB Do lla rs P e rc e n ta g e * 531312 Nonresidential Property Managers $22,924,301 0.7 541614 Process, Physical Distribution and Logistics Consulting Services $22,953,821 0.8 541690 Scientific

  1. ESBWR response to an extended station blackout/loss of all AC power

    SciTech Connect (OSTI)

    Barrett, A. J.; Marquino, W.

    2012-07-01

    U.S. federal regulations require light water cooled nuclear power plants to cope with Station Blackouts for a predetermined amount of time based on design factors for the plant. U.S. regulations define Station Blackout (SBO) as a loss of the offsite electric power system concurrent with turbine trip and unavailability of the onsite emergency AC power system. According to U.S. regulations, typically the coping period for an SBO is 4 hours and can be as long as 16 hours for currently operating BWR plants. Being able to cope with an SBO and loss of all AC power is required by international regulators as well. The U.S. licensing basis for the ESBWR is a coping period of 72 hours for an SBO based on U.S. NRC requirements for passive safety plants. In the event of an extended SBO (viz., greater than 72 hours), the ESBWR response shows that the design is able to cope with the event for at least 7 days without AC electrical power or operator action. ESBWR is a Generation III+ reactor design with an array of passive safety systems. The ESBWR primary success path for mitigation of an SBO event is the Isolation Condenser System (ICS). The ICS is a passive, closed loop, safety system that initiates automatically on a loss of power. Upon Station Blackout or loss of all AC power, the ICS begins removing decay heat from the Reactor Pressure Vessel (RPV) by (i) condensing the steam into water in heat exchangers located in pools of water above the containment, and (ii) transferring the decay heat to the atmosphere. The condensed water is then returned by gravity to cool the reactor again. The ICS alone is capable of maintaining the ESBWR in a safe shutdown condition after an SBO for an extended period. The fuel remains covered throughout the SBO event. The ICS is able to remove decay heat from the RPV for at least 7 days and maintains the reactor in a safe shutdown condition. The water level in the RPV remains well above the top of active fuel for the duration of the SBO event. Beyond 7 days, only a few simple actions are needed to cope with the SBO for an indefinite amount of time. The operation of the ICS as the primary success path for mitigation of an SBO, allows for near immediate plant restart once power is restored. (authors)

  2. Los Alamos National Security, LLC Contract No. DE-AC52-06NA25396

    National Nuclear Security Administration (NNSA)

    Los Alamos National Security, LLC Contract No. DE-AC52-06NA25396 Attachment to Modification No. 150 PART III - SECTION J APPENDIX G October 5, 2010 [Modified by Modification No. A009, A015, A018, A019, A021, A027, M033, M041, M042, M046, M056, M062, M069, M078, M103, M133, 150] LIST OF APPLICABLE DIRECTIVES In addition to the list of applicable directives listed below, the Contractor shall also comply with supplementary directives, (e.g., manuals) which are invoked by a Contractor Requirements

  3. Modification No. M226 Contract No. DE-AC54-00AL66620

    National Nuclear Security Administration (NNSA)

    Modification No. M226 Contract No. DE-AC54-00AL66620 Page No. 2 of 2 The purpose of this Modification is to incorporate the following: A. Replace Part III, LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS, Section J - LIST OF ATTACHMENTS, Appendix A - PERSONNEL APPENDIX in its entirety to update REIMBURSEMENT AUTHORIZATIONS, TABLE OF CONTENTS, to add "I. Exempt Compensatory Time" and "J. Additional Bonus for Non-Key Personnel" to Section I. COMPENSATION SYSTEM, and to

  4. Comparative Study of DC and AC Microgrids in Commercial Buildings Across Different Climates and Operating Profiles: Preprint

    SciTech Connect (OSTI)

    Fregosi, D.; Ravula, S.; Brhlik, D.; Saussele, J.; Frank, S.; Bonnema, E.; Scheib, J.; Wilson, E.

    2015-04-22

    Bosch has developed and demonstrated a novel DC microgrid system designed to maximize utilization efficiency for locally generated photovoltaic energy while offering high reliability, safety, redundancy, and reduced cost compared to equivalent AC systems. Several demonstration projects validating the system feasibility and expected efficiency gains have been completed and additional ones are in progress. This work gives an overview of the Bosch DC microgrid system and presents key results from a large simulation study done to estimate the energy savings of the Bosch DC microgrid over conventional AC systems. The study examined the system performance in locations across the United States for several commercial building types and operating profiles and found that the Bosch DC microgrid uses generated PV energy 6%–8% more efficiently than traditional AC systems.

  5. Effect of AC target power on AlN film quality

    SciTech Connect (OSTI)

    Knisely, Katherine Grosh, Karl

    2014-09-01

    The influence of alternating current (AC) target power on film stress, roughness, and x-ray diffraction rocking curve full width half maximum (FWHM) was examined for AlN films deposited using S-gun magnetron sputtering on insulative substrates consisting of Si wafers with 575 nm thermal oxide. As the AC target power was increased from 5 to 8 kW, the deposition rate increased from 9.3 to 15.9 A/s, film stress decreased from 81 to −170 MPa, and the rocking curve FWHM increased from 0.98 to 1.03°. AlN film behavior is observed to change with target life; films deposited at 200 kWh target life were approximately 40 MPa more compressive and had 0.02° degree higher rocking curve FWHM values than films deposited at 130 kWh. AlN films deposited in two depositions were compared with films deposited in a single deposition, in order to better characterize the growth behavior and properties of AlN films deposited on an existing AlN film, which is not well understood. Two deposition films, when compared with single deposition films, showed no variation in residual stress trends or grain size behavior, but the average film roughness increased from 0.7 to 1.4 nm and rocking curve FWHM values increased by more than 0.25°.

  6. AC Resonant charger with charge rate unrelated to primary power frequency

    DOE Patents [OSTI]

    Watson, Harold

    1982-01-01

    An AC resonant charger for a capacitive load, such as a PFN, is provided with a variable repetition rate unrelated to the frequency of a multi-phase AC power source by using a control unit to select and couple the phase of the power source to the resonant charger in order to charge the capacitive load with a phase that is the next to begin a half cycle. For optimum range in repetition rate and increased charging voltage, the resonant charger includes a step-up transformer and full-wave rectifier. The next phase selected may then be of either polarity, but is always selected to be of a polarity opposite the polarity of the last phase selected so that the transformer core does not saturate. Thyristors are used to select and couple the correct phase just after its zero crossover in response to a sharp pulse generated by a zero-crossover detector. The thyristor that is turned on then automatically turns off after a full half cycle of its associated phase input. A full-wave rectifier couples the secondary winding of the transformer to the load so that the load capacitance is always charged with the same polarity.

  7. Plateau Remediation Contract Section J Contract No. DE-AC06-07RL14788 Modification No. 382

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Modification No. 382 J 4-1 ATTACHMENT J.4 PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) Plateau Remediation Contract Section J Contract No. DE-AC06-07RL14788 Modification No. 382 J 4-2 Fiscal Year 2015 Performance Evaluation and Measurement Plan For CH2MHill Plateau Remediation Company Performance Period: October 1, 2014 through September 30, 2015 Plateau Remediation Contract Section J Contract No. DE-AC06-07RL14788 Modification No. 382 J 4-3 TABLE OF CONTENTS PERFORMANCE EVALUATION AND

  8. COR-Y12-12/7/2012-21660 DE-AC05-00OR22800 DOE Form

    National Nuclear Security Administration (NNSA)

    COR-Y12-12/7/2012-21660 DE-AC05-00OR22800 DOE Form (04/1991) U.S. Department of Energy Requirements Change Notice No.: NNSA-49 Page 1 of 36 Pages PROJECT: Baseline List of Required Compliance Documents LOCATION: Oak Ridge, Tennessee CONTRACTOR: Babcock & Wilcox Technical Services Y-12, LLC CONTRACT NO.: DE-AC05-00OR22800, I.85, Laws, Regulations, and DOE Directives (December 2000), DEAR 970.5204-2 DATE OF CONTRACT: August 31, 2000 This Requirements Change Notice (RCN) No. NNSA-49

  9. DOE/OR/21548-193 CONTRACT NO. DE-AC05-860R21548 ANNUAL SITE ENVIRONMENTAL

    Office of Legacy Management (LM)

    548-193 CONTRACT NO. DE-AC05-860R21548 ANNUAL SITE ENVIRONMENTAL REPORT FOR CALENDAR YEAR 1990 Weldon Spring Site Remedial Action Project Weldon Spring, Missouri SEPTEMBER 1991 U.S. Department of Energy Oak Ridge Operations Office Weldon Spring Site Remedial Action Project REV. 1 DOE/OR/21548-193 CONTRACT NO. DE-AC05-860R21548 ANNUAL SITE ENVIRONMENTAL REPORT FOR CALENDAR YEAR 1990 Weldon Spring Site Remedial Action Project Weldon Spring, Missouri SEPTEMBER 1991 U.S. Department of Energy Oak

  10. Valley Forge Corporate Center

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    April 29, 2013 Ms. Brenda Edwards US Department of Energy Buildings Technologies Program Mail Stop EE-2J 1000 Independence Ave, SW Washington, DC 20585-0121 Re: Energy Conservation Program: Notice of Proposed Rulemaking for Energy Conservation Standards for Residential Water Heaters, Docket Number: EERE-2012-BT- STD-0022, RIN Number: 1904-AC78 Dear Ms. Edwards: PJM provides these supplemental comments to underscore, from the perspective of the independent grid operator, the need for the

  11. The sluggs survey: HST/ACS mosaic imaging of the NGC 3115 globular cluster system

    SciTech Connect (OSTI)

    Jennings, Zachary G.; Romanowsky, Aaron J.; Brodie, Jean P.; Arnold, Jacob A.; Strader, Jay; Lin, Dacheng; Irwin, Jimmy A.; Wong, Ka-Wah; Sivakoff, Gregory R.

    2014-08-01

    We present Hubble Space Telescope/Advanced Camera for Surveys (HST/ACS) g and z photometry and half-light radii R {sub h} measurements of 360 globular cluster (GC) candidates around the nearby S0 galaxy NGC 3115. We also include Subaru/Suprime-Cam g, r, and i photometry of 421 additional candidates. The well-established color bimodality of the GC system is obvious in the HST/ACS photometry. We find evidence for a 'blue tilt' in the blue GC subpopulation, wherein the GCs in the blue subpopulation get redder as luminosity increases, indicative of a mass-metallicity relationship. We find a color gradient in both the red and blue subpopulations, with each group of clusters becoming bluer at larger distances from NGC 3115. The gradient is of similar strength in both subpopulations, but is monotonic and more significant for the blue clusters. On average, the blue clusters have ?10% larger R {sub h} than the red clusters. This average difference is less than is typically observed for early-type galaxies but does match that measured in the literature for the Sombrero Galaxy (M104), suggesting that morphology and inclination may affect the measured size difference between the red and blue clusters. However, the scatter on the R {sub h} measurements is large. We also identify 31 clusters more extended than typical GCs, which we term ultra-compact dwarf (UCD) candidates. Many of these objects are actually considerably fainter than typical UCDs. While it is likely that a significant number will be background contaminants, six of these UCD candidates are spectroscopically confirmed as NGC 3115 members. To explore the prevalence of low-mass X-ray binaries in the GC system, we match our ACS and Suprime-Cam detections to corresponding Chandra X-ray sources. We identify 45 X-ray-GC matches: 16 among the blue subpopulation and 29 among the red subpopulation. These X-ray/GC coincidence fractions are larger than is typical for most GC systems, probably due to the increased depth of the X-ray data compared to previous studies of GC systems.

  12. Controller for controlling operation of at least one electrical load operating on an AC supply, and a method thereof

    DOE Patents [OSTI]

    Cantin, Luc (Baie Comeau, CA); Deschenes, Mario (Baie Comeau, CA); D'Amours, Mario (Sept Iles, CA)

    1995-08-15

    A controller is provided for controlling operation of at least one electrical load operating on an AC supply having a typical frequency, the AC supply being provided via power transformers by an electrical power distribution grid. The controller is associated with the load and comprises an input interface for coupling the controller to the grid, a frequency detector for detecting the frequency of the AC supply and producing a signal indicative of the frequency, memory modules for storing preprogrammed commands, a frequency monitor for reading the signal indicative of the frequency and producing frequency data derived thereof, a selector for selecting at least one of the preprogrammed commands with respect to the frequency data, a control unit for producing at least one command signal representative of the selected preprogrammed commands, and an output interface including a device responsive to the command signal for controlling the load. Therefore, the load can be controlled by means of the controller depending on the frequency of the AC supply.

  13. Method and system for an on-chip AC self-test controller

    DOE Patents [OSTI]

    Flanagan, John D.; Herring, Jay R.; Lo, Tin-Chee

    2008-09-30

    A method and system for performing AC self-test on an integrated circuit that includes a system clock for use during normal operation are provided. The method includes applying a long data capture pulse to a first test register in response to the system clock, applying an at speed data launch pulse to the first test register in response to the system clock, inputting the data from the first register to a logic path in response to applying the at speed data launch pulse to the first test register, applying an at speed data capture pulse to a second test register in response to the system clock, inputting the logic path output to the second test register in response to applying the at speed data capture pulse to the second test register, and applying a long data launch pulse to the second test register in response to the system clock.

  14. Method and system for an on-chip AC self-test controller

    DOE Patents [OSTI]

    Flanagan, John D.; Herring, Jay R.; Lo, Tin-Chee

    2006-06-06

    A method for performing AC self-test on an integrated circuit, including a system clock for use during normal operation. The method includes applying a long data capture pulse to a first test register in response to the system clock, and further applying at an speed data launch pulse to the first test register in response to the system clock. Inputting the data from the first register to a logic path in response to applying the at speed data launch pulse to the first test register. Applying at speed data capture pulse to a second test register in response to the system clock. Inputting the output from the logic path to the second test register in response to applying the at speed data capture pulse to the second register. Applying a long data launch pulse to the second test register in response to the system clock.

  15. Test Results of the AC Field Measurements of Fermilab Booster Corrector Magnets

    SciTech Connect (OSTI)

    DiMarco, E.Joseph; Harding, D.J.; Kashikhin, V.S.; Kotelnikov, S.K.; Lamm, M.J.; Makulski, A.; Nehring, R.; Orris, D.F.; Schlabach, P.; Sylvester, C.; Tartaglia, Michael Albert; /Fermilab

    2008-06-25

    Multi-element corrector magnets are being produced at Fermilab that enable correction of orbits and tunes through the entire cycle of the Booster, not just at injection. The corrector package includes six different corrector elements--normal and skew orientations of dipole, quadrupole, and sextupole--each independently powered. The magnets have been tested during typical AC ramping cycles at 15Hz using a fixed coil system to measure the dynamic field strength and field quality. The fixed coil is comprised of an array of inductive pick-up coils around the perimeter of a cylinder which are sampled simultaneously at 100 kHz with 24-bit ADC's. The performance of the measurement system and a summary of the field results are presented and discussed.

  16. Microsoft Word - DE-AC06-09RL15009 Section I.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    II Contract No. DE-AC06-09RL15009 Section I Page I-1 Section I Part II - Contract Clauses Table of Contents Section Title Page No. I.1 FAR 52.252-2 Clauses Incorporated by Reference (Feb 1998) I-2 I.2 FAR 52.217-8 Option to Extend Services (Nov 1999) I-4 I.3 FAR 52.217-9 Option to Extend the Term of the Contract (Mar 2000) I-4 I.4 FAR 52.222-42 Statement of Equivalent Rates for Federal Hires (May 1989) I-4 I.5 DEAR 970.5204-2 Laws, Regulations and DOE Directives (Dec 2000) I-4 I.6 DEAR

  17. Data:9f33a9f9-21ad-47b2-9b1f-4b3771f914ac | Open Energy Information

    Open Energy Info (EERE)

    ad-47b2-9b1f-4b3771f914ac No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic...

  18. Data:C9125b18-da0a-4612-b0c6-3eb6421ac6c2 | Open Energy Information

    Open Energy Info (EERE)

    b0c6-3eb6421ac6c2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic...

  19. Applications of exact linearization techniques for steady-state stability enhancement in a weak ac/dc system

    SciTech Connect (OSTI)

    Kaprielian, S.; Clements, K. ); Turi, J. )

    1992-05-01

    A nonlinear control strategy to improve the steady-state stability of a weak AC/DC power system is presented. The approach described in this paper is based on the extension of feedback linearization techniques to nonlinear descriptor system models. This method produces a nonlinear control strategy which is capable of enhancing system performance for various system operating conditions. This claim is supported with simulation results.

  20. Occupational Health Services Part I DE-AC06-04RL14383, Modification No. 139 Section B

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DE-AC06-04RL14383, Modification No. 139 Section B Page B-2 B.1 Occupational Medical Services a. This is a performance-based, cost reimbursement service contract for the rendering of Occupational Medical Services for the U. S. Department of Energy's Hanford Site. The Contractor shall furnish all personnel, facilities, equipment, material, supplies, and services (except as expressly set forth in this contract as furnished by the Government) and otherwise do all things necessary for, or incident

  1. Occupational Health Services Part I DE-AC06-04RL14383, Modification No. 171 Section B

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Occupational Health Services Part I DE-AC06-04RL14383, Modification No. 171 Section B Page B-2 B.1 Occupational Medical Services a. This is a performance-based, cost reimbursement service contract for the rendering of Occupational Medical Services for the U. S. Department of Energy's Hanford Site. The Contractor shall furnish all personnel, facilities, equipment, material, supplies, and services (except as expressly set forth in this contract as furnished by the Government) and otherwise do all

  2. The change in dielectric constant, AC conductivity and optical band gaps of polymer electrolyte film: Gamma irradiation

    SciTech Connect (OSTI)

    Raghu, S. Subramanya, K. Sharanappa, C. Mini, V. Archana, K. Sanjeev, Ganesh Devendrappa, H.

    2014-04-24

    The effects of gamma (?) irradiation on dielectric and optical properties of polymer electrolyte film were investigated. The dielectric constant and ac conductivity increases with ? dose. Also optical band gap decreased from 4.23 to 3.78ev after irradiation. A large dependence of the polymer properties on the irradiation dose was noticed. This suggests that there is a possibility of improving polymer electrolyte properties on gamma irradiation.

  3. Mission Support Contract Section J -4 Contract No. DE-AC06-09RL14728 Modification 145

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    -4 Contract No. DE-AC06-09RL14728 Modification 145 J-4-1 ATTACHMENT J-4-b Mission Support Contract Performance Evaluation and Measurement Plan The Performance Evaluation and Measurement Plan (PEMP) details the administration of performance incentives and allocation of total available fee as defined in Section B, Supplies or Services and Prices/Costs. 1. PERFORMANCE INCENTIVES Each performance incentive will set forth the specific requirements, criteria and/or specifications for acceptable

  4. Mission Support Contract Section J-4 Contract No. DE-AC06-09RL14728 Modification 052

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract No. DE-AC06-09RL14728 Modification 052 J-4-1 ATTACHMENT J-4 Mission Support Contract Performance Evaluation and Measurement Plan The Performance Evaluation and Measurement Plan (PEMP) details the administration of performance incentives and allocation of total available fee as defined in Section B, Supplies or Services and Prices/Costs. 1. PERFORMANCE MEASURES Each performance measure will set forth the specific requirements, criteria and/or specifications for acceptable performance of

  5. Crystal structure of the FLT3 kinase domain bound to the inhibitor quizartinib (AC220)

    SciTech Connect (OSTI)

    Zorn, Julie A.; Wang, Qi; Fujimura, Eric; Barros, Tiago; Kuriyan, John; Boggon, Titus J.

    2015-04-02

    More than 30% of acute myeloid leukemia (AML) patients possess activating mutations in the receptor tyrosine kinase FMS-like tyrosine kinase 3 or FLT3. A small-molecule inhibitor of FLT3 (known as quizartinib or AC220) that is currently in clinical trials appears promising for the treatment of AML. Here, we report the co-crystal structure of the kinase domain of FLT3 in complex with quizartinib. FLT3 with quizartinib bound adopts an “Abl-like” inactive conformation with the activation loop stabilized in the “DFG-out” orientation and folded back onto the kinase domain. This conformation is similar to that observed for the uncomplexed intracellular domain of FLT3 as well as for related receptor tyrosine kinases, except for a localized induced fit in the activation loop. The co-crystal structure reveals the interactions between quizartinib and the active site of FLT3 that are key for achieving its high potency against both wild-type FLT3 as well as a FLT3 variant observed in many AML patients. This co-complex further provides a structural rationale for quizartinib-resistance mutations.

  6. Method and apparatus for pulse width modulation control of an AC induction motor

    DOE Patents [OSTI]

    Geppert, Steven (Bloomfield Hills, MI); Slicker, James M. (Union Lake, MI)

    1984-01-01

    An inverter is connected between a source of DC power and a three-phase AC induction motor, and a micro-processor-based circuit controls the inverter using pulse width modulation techniques. In the disclosed method of pulse width modulation, both edges of each pulse of a carrier pulse train are equally modulated by a time proportional to sin .THETA., where .THETA. is the angular displacement of the pulse center at the motor stator frequency from a fixed reference point on the carrier waveform. The carrier waveform frequency is a multiple of the motor stator frequency. The modulated pulse train is then applied to each of the motor phase inputs with respective phase shifts of 120.degree. at the stator frequency. Switching control commands of electronic switches in the inverter are stored in a random access memory (RAM) and the locations of the RAM are successively read out in a cyclic manner, each bit of a given RAM location controlling a respective phase input of the motor. The DC power source preferably comprises rechargeable batteries and all but one of the electronic switches in the inverter can be disabled, the remaining electronic switch being part of a "flyback" DC-DC converter circuit for recharging the battery.

  7. Oscillation phenomena of a plasma produced by an AC driven hot cathode

    SciTech Connect (OSTI)

    Takahashi, Yuki; Miyamoto, Naoki; Kasuya, Toshiro; Wada, Motoi

    2012-11-06

    Amplitude of oscillating discharge current has been measured for Bernas-type ion source equipped with an alternating current heated hot tungsten filament cathode. Measurements have been made by changing the filament diameter from 0.2 mm to 0.7 mm, and by changing the DC discharge current from 0.1 A to 1.5 A. The fluctuation amplitude of the discharge current was found decreased as the diameter of the filament was enlarged. The fluctuation amplitude took the minimum value at a frequency from several hundred Hz to 1 kHz depending upon the filament diameter and DC discharge current. For example, the relative oscillation amplitude was the smallest at 1 kHz for 0.7 mm diameter filament. Increase in discharge current had reduced the minimum oscillation amplitude, and increased the frequency at which the oscillating amplitude took the minimum. Fundamental mechanisms relevant to these characteristics of oscillation amplitude of discharge current from an AC driven hot cathode filament are discussed.

  8. Crystal structure of the FLT3 kinase domain bound to the inhibitor quizartinib (AC220)

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Zorn, Julie A.; Wang, Qi; Fujimura, Eric; Barros, Tiago; Kuriyan, John; Boggon, Titus J.

    2015-04-02

    More than 30% of acute myeloid leukemia (AML) patients possess activating mutations in the receptor tyrosine kinase FMS-like tyrosine kinase 3 or FLT3. A small-molecule inhibitor of FLT3 (known as quizartinib or AC220) that is currently in clinical trials appears promising for the treatment of AML. Here, we report the co-crystal structure of the kinase domain of FLT3 in complex with quizartinib. FLT3 with quizartinib bound adopts an “Abl-like” inactive conformation with the activation loop stabilized in the “DFG-out” orientation and folded back onto the kinase domain. This conformation is similar to that observed for the uncomplexed intracellular domain ofmore » FLT3 as well as for related receptor tyrosine kinases, except for a localized induced fit in the activation loop. The co-crystal structure reveals the interactions between quizartinib and the active site of FLT3 that are key for achieving its high potency against both wild-type FLT3 as well as a FLT3 variant observed in many AML patients. This co-complex further provides a structural rationale for quizartinib-resistance mutations.« less

  9. Valley Forge Corporate Center

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... presently in the PJM interconnection queue 2 , as well as the approximately 40,000 MW ... all resources in the PJM interconnection queue can be found at: http:www.pjm.com...

  10. THE ACS FORNAX CLUSTER SURVEY. VI. THE NUCLEI OF EARLY-TYPE GALAXIES IN THE FORNAX CLUSTER

    SciTech Connect (OSTI)

    Turner, Monica L.; Cote, Patrick; Ferrarese, Laura; Blakeslee, John P.; Jordan, Andres; Mei, Simona; Peng, Eric W.; West, Michael J.

    2012-11-15

    The Advanced Camera for Surveys (ACS) Fornax Cluster Survey is a Hubble Space Telescope program to image 43 early-type galaxies in the Fornax cluster, using the F475W and F850LP bandpasses of the ACS. We employ both one-dimensional and two-dimensional techniques to characterize the properties of the stellar nuclei in these galaxies, defined as the central 'luminosity excesses', relative to a Sersic model fitted to the underlying host. We find 72% {+-} 13% of our sample (31 galaxies) to be nucleated, with only three of the nuclei offset by more than 0.''5 from their galaxy photocenter, and with the majority of nuclei having colors bluer than their hosts. The nuclei are observed to be larger, and brighter, than typical Fornax globular clusters and to follow different structural scaling relations. A comparison of our results to those from the ACS Virgo Cluster Survey reveals striking similarities in the properties of the nuclei belonging to these different environments. We briefly review a variety of proposed formation models and conclude that, for the low-mass galaxies in our sample, the most important mechanism for nucleus growth is probably infall of star clusters through dynamical friction, while for higher mass galaxies, gas accretion triggered by mergers, accretions, and tidal torques is likely to dominate, with the relative importance of these two processes varying smoothly as a function of galaxy mass. Some intermediate-mass galaxies in our sample show a complexity in their inner structure that may be the signature of the 'hybrid nuclei' that arose through parallel formation channels.

  11. Gas sensing properties of magnesium doped SnO{sub 2} thin films in relation to AC conduction

    SciTech Connect (OSTI)

    Deepa, S.; Skariah, Benoy Thomas, Boben; Joseph, Anisha

    2014-01-28

    Conducting magnesium doped (0 to 1.5 wt %) tin oxide thin films prepared by Spray Pyrolysis technique achieved detection of 1000 ppm of LPG. The films deposited at 304 C exhibit an enhanced response at an operating temperature of 350 C. The microstructural properties are studied by means of X-ray diffraction. AC conductivity measurements are carried out using precision LCR meter to analyze the parameters that affect the variation in sensing. The results are correlated with compositional parameters and the subsequent modification in the charge transport mechanism facilitating an enhanced LPG sensing action.

  12. 1. CON'I'AC'r ID CODE PAGE OF PAGES AMENDMENT OF SOLICITATIONIMODIFICATION OF CONTRACT II 11 3

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CON'I'AC'r ID CODE PAGE OF PAGES AMENDMENT OF SOLICITATIONIMODIFICATION OF CONTRACT II 11 3 2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE (M/D.'F) 4. REQUISITION/PURCHASE RE-Q. NO. S. PROJECT1 NO. t7fapplieoble) 27See Block 16C 12EM001839 6. ISUED13Y ODE7. ADMINISTER.ED BY (If uI/wr ius /tem 6) CODE U.S. Department of Energy Office or River Protection P. 0. Box 450, MS 146-60 Richland, WA 99352 1. NAME AND ADDRESS OF CONTRACTOR (No.,stree, county State and Z11' code) 9A, AMENDMEN f

  13. Plateau Remediation Contract Section J Contract No. DE-AC06-08RL14788 Attachment J.11, Revision 0

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CONTRACT LINE ITEM NUMBER (CLIN) ASSIGNMENT AGAINST CONTRACT STRUCTURE The table entitled, CONTRACT LINE ITEM NUMBER (CLIN) ASSIGNMENT AGAINST CONTRACT STRUCTURE, is included as a separate file. Plateau Remediation Contract Contract No. DE-AC06-08RL14788 ATTACHMENT J-11 CONTRACT LINE ITEM NUMBER (CLIN) ASSIGNMENT AGAINST CONTRACT STRUCTURE Section J Attachment J-11, Revision 2 PRC STATEMENT OF WORK SECTION ASSIGNED WBS ELEMENTS CLIN C.2.1 Transition 013.01 Project Management - PBS RL-13 1 C.2.1

  14. Occupational Health Services Part III Contract No. DE-AC06-04RL14383, Modification 142 Section J

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    III Contract No. DE-AC06-04RL14383, Modification 142 Section J Page J-11 J.3 Health Care Center Description There is a Health Care Center located in the 200 West Area of the Hanford Site, that is staffed by the Occupational Medical Contractor to provide first aid services to workers in the adjacent areas. The 200 West Facility is Government-Furnished. The Health Care Center consists of office space, examination/treatment rooms, storage rooms, etc. as shown on the floor plan in Figure J.3- 1,

  15. Occupational Health Services Part III Contract No. DE-AC06-04RL14383, Modification 152 Section J

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    III Contract No. DE-AC06-04RL14383, Modification 152 Section J Page J-13 J.6 List of Applicable Directives The Directives listed below can be obtained from the following websites: DOE Directives: http://www.directives.doe.gov/ DOE-RL CRD Supplements: http://idmsweb/idmsprod/livelink.exe?func=ll&objId=3423698&objAction=Open&viewType=1 Directive Identifier Title Date of Order or CRD CRD Supplement RRD 002 The Department of Energy Richland Operations Office (RL) Software Quality

  16. PREPARED FOR THE U.S. DEPARTMENT OF ENERGY, UNDER CONTRACT DE-AC02-76-CHO-3073

    Office of Scientific and Technical Information (OSTI)

    PREPARED FOR THE U.S. DEPARTMENT OF ENERGY, UNDER CONTRACT DE-AC02-76-CHO-3073 PPPL-2818 PPPL-2818 UC-422,427 THREE-DIMENSIONAL TOKAMAKEQUILIBRIA * INTHE PRESENCEOF RESONANTFIELDERRORS BY A. REIMANAND D. MONTICELLO January 1992 IDIRII_I['TO_I I_L.ABMA I_lYSmcl L.ABORATC)RY i NOTICE v, This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Govern,nent nor any agency thereof, nor any of their employees, makes any warranty,

  17. PREPARED FOR THE U.S. DEPARTMENT OF ENERGY, UNDER CONTRACT DE-AC02-76-CHO-3073

    Office of Scientific and Technical Information (OSTI)

    UNDER CONTRACT DE-AC02-76-CHO-3073 PPPL-3099 PPPL-3099 UC-427 & SINGULAR SURFACES IN THE OPEN FIELD LINE REGION OF A DIVERTED TOKAMAK BY A. REIMAN MAY 1995 PRINCETON PLASMA PHYSICS LABORATORY - - NOTICE J This report was prepared unt of work sponsored by an agency of the United States Government. Nei States Government nor any agency thereof, nor any of their mploye y, express or implied, or assumes any legal liability or responsibi , completeness, or usefulness of any information,

  18. NO. OF DOCUMENT BEING CONTINUED ~AE O CONTINUATION SHEET DE-AC27-08RV14800/061

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    REFERENCE NO. OF DOCUMENT BEING CONTINUED ~AE O CONTINUATION SHEET DE-AC27-08RV14800/061 12 4 NAME OF OFFEROR OR CONTRACTOR WASHINGTON RIVER PROTECTION SOLUTIONS LLC ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT (A) (B) (C) (D) (E) (F) LIST OF CHANGES: Obligated Amount for this Modification: $ 1,7 86, 0 99.16 New Total Obligated Amount for this Award: $1, 126, 648,414.21 Incremental Funded Amount changed: from $1, 124,762,315.05 to $1, 126, 648,414.21 Account code: P&B Rocky

  19. Reliable, Efficient and Cost-Effective Electric Power Converter for Small Wind Turbines Based on AC-link Technology

    SciTech Connect (OSTI)

    Darren Hammell; Mark Holveck; DOE Project Officer - Keith Bennett

    2006-08-01

    Grid-tied inverter power electronics have been an Achilles heel of the small wind industry, providing opportunity for new technologies to provide lower costs, greater efficiency, and improved reliability. The small wind turbine market is also moving towards the 50-100kW size range. The unique AC-link power conversion technology provides efficiency, reliability, and power quality advantages over existing technologies, and Princeton Power will adapt prototype designs used for industrial asynchronous motor control to a 50kW small wind turbine design.

  20. Mission Support Contract Section B Contract No. DE-AC06-09RL14728 Modification 482483

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mission Support Contract Section B Contract No. DE-AC06-09RL14728 Modification 482483 B-1 Section B, Clause B.3, Obligation and Availability of Funds, is modified as follows: from: (a) Obligation of Funds. Pursuant to the Section I Clause entitled, FAR 52.232-22, Limitation of Funds, total funds in the amount of $1,825,349,363.00 have been allotted for obligation and are available for payment of services provided from the effective date of this Contract through May 25, 2017. to: (a) Obligation

  1. Mission Support Contract Section J Contract No. DE-AC06-09RL14728 Modification 157

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 Page 1 of 2 Attachment J-16 Portfolio Management Task Order 12-001 Title: Project Management and Project Controls Services to the River Corridor Closure Project (RCCP) Revision Number: 02 Date: October 21, 2011 Start: October 1, 2011 Finish: September 30, 2012 1.0 DESCRIPTION Mission Support Alliance (MSA) will provide the following project management/project controls support services as described below. The services will be performed in accordance with Contract DE-AC06-09RL14728, C.2.5,

  2. Mission Support Contract Section J Contract No. DE-AC06-09RL14728 Modification 223

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    223 Attachment J-16 Portfolio Management Task Order 13-001 Title: Project Management and Project Controls Services to the River Corridor Closure Project (RCCP) Revision Number: 0 Date: September 05, 2012 Start: October 1, 2012 Finish: September 30, 2013 1.0 DESCRIPTION Mission Support Alliance (MSA) will provide the following project management/project controls support services as described below. The services will be performed in accordance with Contract DE-AC06-09RL14728, C.2.5, Portfolio

  3. Mission Support Contract Section J-16 Contract No. DE-AC06-09RL14728 Modification 478

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mission Support Contract Section J-16 Contract No. DE-AC06-09RL14728 Modification 478 Technical Proposal Portfolio Management Task Order 15-002 Title: Development of Dashboard Solutions for DOE-ORP Projects and Programs Phase 3 Revision Number: 2 Date: July 1, 2015 Start: July 1, 2015 Finish: December 31, 2015 1.0 DESCRIPTION Mission Support Alliance, LLC (MSA) Portfolio Management (PFM) will provide U.S. Department of Energy (DOE), Office of River Protection (ORP) support in the Development of

  4. Mission Support Contract Section J.16 Contract No. DE-AC06-09RL14728 Modification 459

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    No. DE-AC06-09RL14728 Modification 459 Page 1 of 2 Portfolio Management Task Order 15-004 Statement of Work Title: DOE-RL Nuclear Safety Division - Safety Basis Review and Approval Process SIA Revision Number: 0 Date: May 12, 2015 Start: May 18, 2015 Finish: June 30, 2015 1.0 DESCRIPTION Mission Support Alliance (MSA) will provide subject matter experts to provide facilitation and project management support for an Operating Excellence (OE) Structured Improvement Activity (SIA) for the Department

  5. Attachment to Modification M067 BWXT Pantex, LLC Contract No. DE-AC04-00AL66620

    National Nuclear Security Administration (NNSA)

    M067 BWXT Pantex, LLC Contract No. DE-AC04-00AL66620 PX-SEC-J (6-24-04).doc J-App. E-1 PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS SECTION J - LIST OF ATTACHMENTS APPENDIX E - LIST OF APPLICABLE DIRECTIVES June 24, 2004 Pursuant to the contract clause entitled "Laws, Regulations, and DOE Directives," the following list of Directives is applicable to this contract. Environmental, Safety, and Health (ES&H) requirements for work conducted under this contract have

  6. Attachment to Modification M125 BWXT Pantex, LLC Contract No. DE-AC04-00AL66620

    National Nuclear Security Administration (NNSA)

    M125 BWXT Pantex, LLC Contract No. DE-AC04-00AL66620 PX-SEC-J (01/16/07) J-App. E-1 PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS SECTION J - LIST OF ATTACHMENTS APPENDIX E - LIST OF APPLICABLE DIRECTIVES January 16, 2007 Pursuant to the contract clause entitled "Laws, Regulations, and DOE Directives," the following list of directives is applicable to this contract. Environmental, Safety, and Health (ES&H) requirements for work conducted under this contract have

  7. Modification No. M081 BWXT Pantex, LLC Contract No. DE-AC04-00AL66620

    National Nuclear Security Administration (NNSA)

    1 BWXT Pantex, LLC Contract No. DE-AC04-00AL66620 Page 2 of 4 1. This modification deletes Appendix D entitled, "Key Personnel," dated August 23, 2004, that is currently in Section J of the Contract and replaces it with Attachment 1, Appendix D entitled, "Key Personnel," dated December 23, 2004, of this Modification. 2. This modification deletes Contract Clause I 63. entitled, "DEAR 952.204-2 Security (SEP 1997)(Modified)," and replaces it with Contract Clause I 63.

  8. Developing 226Ra and 227Ac age-dating techniques for nuclear forensics to gain insight from concordant and non-concordant radiochronometers

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Kayzar, Theresa M.; Williams, Ross W.

    2015-09-26

    The model age or ‘date of purification’ of a nuclear material is an important nuclear forensic signature. In this study, chemical separation and MC-ICP-MS measurement techniques were developed for 226 Ra and 227Ac: grand-daughter nuclides in the 238U and 235U decay chains respectively. The 230Th-234U, 226Ra-238U, 231Pa-235U, and 227Ac-235U radiochronometers were used to calculate model ages for CRM-U100 standard reference material and two highly-enriched pieces of uranium metal from the International Technical Working Group Round Robin 3 Exercise. In conclusion, the results demonstrate the accuracy of the 226Ra-238U and 227Ac-235U chronometers and provide information about nuclide migration during uranium processing.

  9. Development of a New Class of Low Cost, High Frequency Link Direct DC to AC Converters for Solid Oxide Fuel Cells (SOFC)

    SciTech Connect (OSTI)

    Prasad Enjeti; J.W. Howze

    2003-12-01

    This project proposes to design and develop a new class of power converters (direct DC to AC) to drastically improve performance and optimize the cost, size, weight and volume of the DC to AC converter in SOFC systems. The proposed topologies employ a high frequency link; direct DC to AC conversion approach. The direct DC to AC conversion approach is more efficient and operates without an intermediate dc-link stage. The absence of the dc-link, results in the elimination of bulky, aluminum electrolytic capacitors, which in turn leads to a reduction in the cost, volume, size and weight of the power electronic converter. The feasibility of two direct DC to AC converter topologies and their suitability to meet SECA objectives will be investigated. Laboratory proto-type converters (3-5kW) will be designed and tested in Phase-1. A detailed design trade-off study along with the test results will be available in the form of a report for the evaluation of SECA Industrial partners. This project proposes to develop a new and innovative power converter technology suitable for Solid Oxide Fuel Cell (SOFC) power systems in accordance with SECA objectives. The proposed fuel cell inverter (FCI) employs state of the art power electronic devices configured in two unique topologies to achieve direct conversion of DC power (24-48V) available from a SOFC to AC power (120/240V, 60Hz) suitable for utility interface and powering stand alone loads. The primary objective is to realize cost effective fuel cell converter, which operates under a wide input voltage range, and output load swings with high efficiency and improved reliability.

  10. DOE Workshop. Load Participation in Capacity and Ancillary Services Market

    SciTech Connect (OSTI)

    Boston, Terry

    2011-10-26

    Presents profile of PJM demand-side resources. PJM provides 24% of generation, 27% of load, and 19% of transmission assets in Eastern Interconnection. Includes case studies.

  11. Electricity Monthly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the report month. Prices and demand are shown for six Regional Transmission Operator (RTO) markets: ISO New England (ISO-NE), New York ISO (NYISO), PJM Interconnection (PJM),...

  12. Electricity Monthly Update

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    New York ISO (NYISO), PJM Interconnection (PJM), Midwest ISO (MISO), Electric Reliability Council of Texas (ERCOT), and two locations in the California ISO (CAISO). Also...

  13. Energy Incentive Programs, Delaware | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    No utility energy efficiency programs are currently available to federal customers. What load managementdemand response options are available to me? The PJM Interconnection (PJM), ...

  14. Energy Incentive Programs, West Virginia | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    What load managementdemand response options are available to me? The PJM Interconnection (PJM), a regional transmission organization (RTO), offers several demand response ...

  15. Management and Operating Contract for the Los Alamos National Laboratory, NNSA contract No. DE-AC52-06NA25396

    National Nuclear Security Administration (NNSA)

    MANAGEMENT AND OPERATING CONTRACT FOR THE LOS ALAMOS NATIONAL LABORATORY NATIONAL NUCLEAR SECURITY ADMINISTRATION CONTRACT No. DE-AC52-06NA25396 DECEMBER 21, 2005 1943 Today Blank Page Blank Page Request for Proposal No. DE-RP52-05NA25396 LANS Contract DE-AC52-06NA25396.doc Section B - H, Page 2 Part I - The Schedule Sections B through H TABLE OF CONTENTS STANDARD FORM 33 SOLICITATION, OFFER AND AWARD....................................... 1 Section B - SUPPLIES OR SERVICES AND PRICES/COSTS

  16. Causal Analysis of the Inadvertent Contact with an Uncontrolled Electrical Hazardous Energy Source (120 Volts AC)

    SciTech Connect (OSTI)

    David E. James; Dennis E. Raunig; Sean S. Cunningham

    2014-10-01

    On September 25, 2013, a Health Physics Technician (HPT) was performing preparations to support a pneumatic transfer from the HFEF Decon Cell to the Room 130 Glovebox in HFEF, per HFEF OI 3165 section 3.5, Field Preparations. This activity involves an HPT setting up and climbing a portable ladder to remove the 14-C meter probe from above ball valve HBV-7. The HPT source checks the meter and probe and then replaces the probe above HBV-7, which is located above Hood ID# 130 HP. At approximately 13:20, while reaching past the HBV-7 valve position indicator switches in an attempt to place the 14-C meter probe in the desired location, the HPTs left forearm came in contact with one of the three sets of exposed terminals on the valve position indication switches for HBV 7. This resulted in the HPT receiving an electrical shock from a 120 Volt AC source. Upon moving the arm, following the electrical shock, the HPT noticed two exposed electrical connections on a switch. The HPT then notified the HFEF HPT Supervisor, who in turn notified the MFC Radiological Controls Manager and HFEF Operations Manager of the situation. Work was stopped in the area and the hazard was roped off and posted to prevent access to the hazard. The HPT was escorted by the HPT Supervisor to the MFC Dispensary and then preceded to CFA medical for further evaluation. The individual was evaluated and released without any medical restrictions. Causal Factor (Root Cause) A3B3C01/A5B2C08: - Knowledge based error/Attention was given to wrong issues - Written Communication content LTA, Incomplete/situation not covered The Causal Factor (root cause) was attention being given to the wrong issues during the creation, reviews, verifications, and actual performance of HFEF OI-3165, which covers the need to perform the weekly source check and ensure placement of the probe prior to performing a rabbit transfer. This resulted in the hazard not being identified and mitigated in the procedure. Work activities with in HFEF-OI-3165 placed the HPT in proximity of an unmitigated hazard directly resulting in this event. Contributing Factor A3B3C04/A4B5C04: - Knowledge Based Error, LTA Review Based on Assumption That Process Will Not Change - Change Management LTA, Risks/consequences associated with change not adequately reviewed/assessed Prior to the pneumatic system being out of service, the probe and meter were not being source checked together. The source check issue was identified and addressed during the period of time when the system was out of service. The corrective actions for this issue resulted in the requirement that a meter and probe be source checked together as it is intended to be used. This changed the activity and required an HPT to weekly, when in use, remove and install the probe from above HBV-7 to meet the requirement of LRD 15001 Part 5 Article 551.5. Risks and consequences associated with this change were not adequately reviewed or assessed. Failure to identify the hazard associated with this change directly contributed to this event.

  17. Efficacy of low level electric current (A-C) for controlling quagga mussles in the Welland Canal

    SciTech Connect (OSTI)

    Fears, C.; Mackie, G.L.

    1995-06-01

    The efficacy of systems (for which patents are pending) which use low-voltage A-C currents for preventing settlement and attachment by zebra mussels were tested with steel rods and plates placed near the intake of a pulp and paper plant in the Welland Canal at Thorold, Ontario. Six racks made of 16 ft. (4.9 m), 2x4s (5.1 x 10.2 cm) were placed into the Welland Canal on August 5, 1994. One rack had 1/8th in (3.2 mm) diam x 12 in (30.5 cm) long steel rods, each separated by 2 in (5.1 cm) attached to pressure treated wood and concrete blocks and an A-C current of 16 v (or 8 v/in); rack 2 had steel rods of the same configuration but 12 v (or 6 v/in) was applied; rack 3 was identical to these but no current was applied and was used as a rod control. The remaining three racks had steel plates, each plate being 3 in (7.6 cm) wide X 24 in (61 cm) long X 1/4 in (6.4 mm) thick and separated by 2 in (5.1 cm); one had 12 v applied (or 6 v/in), another had 16 v applied (or 8 v/in), and the third had no current and was used as a plate control. The racks were placed on the upstream and downstream side of the intake at a depth of about 7 ft (2.1 m) where the mussels populations were heaviest (as determined by SCUBA diving). All mussels were quagga mussels (Dreissena bugensis). The racks were pulled in mid November after settlement was complete and the results showed: (1) complete prevention of settlement of both new recruits and translocators at 8 volts/in with steel rods on both wood and concrete surfaces and with steel plate trash bars; (2) partial prevention of settlement at 6 volts/in with steel rods on both wood and concrete surfaces and steel plates; and (3) that, at current kilowatt hr rates, total efficacy at 8 volts/in would cost approximately $10.80/day/1000 sq ft using rods to protect concrete walls and about $16.32/day/1000 sq ft to protect 3 in wide x 1/4 in thick trash bars. These costs can be reduced even further with pulse dosed AC currents.

  18. Data:Caa5cce6-c6c8-4b7a-ac01-eb6abdf87c9b | Open Energy Information

    Open Energy Info (EERE)

    Caa5cce6-c6c8-4b7a-ac01-eb6abdf87c9b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading......

  19. Data:Eaa8368d-11ca-47bd-bb83-2fd1546e2ac0 | Open Energy Information

    Open Energy Info (EERE)

    Eaa8368d-11ca-47bd-bb83-2fd1546e2ac0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading......

  20. RCC Contract No. DE-AC06-05RL14655 TABLE B.2 SCHEDULE OF QUANTITIES AND TARGET COST

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract No. DE-AC06-05RL14655 TABLE B.2 SCHEDULE OF QUANTITIES AND TARGET COST Section B 593 CLIN 1 CLIN 2 CLIN 3 CLIN 4 100 Area 100-B/C Area FR - 100 B/C Area Design 1.03.01.04.01 Fld. Rem.-100 B/C Area Design 1 LS $702,783 $702,783 Confirmatory Sampling Sites 1.03.01.01.03 Fld. Rem.-Conf Sampling Sites-100 B/C 10 EA $838,517 $838,517 Liquid Waste Site Remediation 1.03.01.02.04 Fld. Rem.-Liquid Waste Sites-100-BC-1 0 TONS $322,870 $322,870 Waste Site Remediation 1.03.01.02.05 / 1.03.01.03.05

  1. PREPARED FOR THE U.S. DEPARTMENT OF ENERGY, UNDER CONTRACT DE-AC02-76-CHO-3073

    Office of Scientific and Technical Information (OSTI)

    r/0*O> PREPARED FOR THE U.S. DEPARTMENT OF ENERGY, UNDER CONTRACT DE-AC02-76-CHO-3073 PPPL-2760 UC-421,427 PPPL-2760 TOKAMAK ERROR FIELDS AND LOCKED MODES BY A. REIMAN AND D. MONTICELLO May 1991 P B I N C I T O N | P L A S M A P H Y S I C S I L A I O R A T Q R V I 1 sr-JiL-tK'- PRINCETON UNIVERSITY, PRINCETON, NEW JERSEY * U I 1 \^{~ r l * l A - ' i - U M L N l JS (JIVLilViif^O NOTICE This report was prepared as an account of work sponsored by an agency of the United States Government.

  2. BWXT/B&W Pantex Contract No. DE-AC04-00AL66620 FY BUDGET

    National Nuclear Security Administration (NNSA)

    BWXT/B&W Pantex Contract No. DE-AC04-00AL66620 FY BUDGET (LAB TABLE) ESTIMATED COST AWARD FEE AVAILABLE WFO FEE AVAILABLE (Estimated) AVAILABLE FEE FROM OTHER REIMBURSABLE WORK (Estimated) AWARD FEE EARNED WFO FEE EARNED EARNED FEE FROM OTHER REIMBURSABLE WORK 2011 533,140,000 498,262,000 34,878,000 276,000 127,000 2010 575,020,000 537,402,000 37,618,000 278,000 120,000 35,930,423 270,406 125,005 2009 511,744,000 478,265,421 33,478,579 224,634 91,932 31,815,053 207,296 192,086 2008

  3. THE HST/ACS COMA CLUSTER SURVEY. VIII. BARRED DISK GALAXIES IN THE CORE OF THE COMA CLUSTER

    SciTech Connect (OSTI)

    Marinova, Irina; Jogee, Shardha; Weinzirl, Tim; Erwin, Peter; Trentham, Neil; Ferguson, Henry C.; Goudfrooij, Paul; Hammer, Derek; Den Brok, Mark; Peletier, Reynier F.; Kleijn, Gijs V.; Graham, Alister W.; Carter, David; Mouhcine, Mustapha; Balcells, Marc; Guzman, Rafael; Hoyos, Carlos; Mobasher, Bahram; Peng, Eric W. E-mail: sj@astro.as.utexas.edu

    2012-02-20

    We use high-resolution ({approx}0.''1) F814W Advanced Camera for Surveys (ACS) images from the Hubble Space Telescope ACS Treasury survey of the Coma cluster at z {approx} 0.02 to study bars in massive disk galaxies (S0s), as well as low-mass dwarf galaxies in the core of the Coma cluster, the densest environment in the nearby universe. Our study helps to constrain the evolution of bars and disks in dense environments and provides a comparison point for studies in lower density environments and at higher redshifts. Our results are: (1) we characterize the fraction and properties of bars in a sample of 32 bright (M{sub V} {approx}< -18, M{sub *} > 10{sup 9.5} M{sub Sun }) S0 galaxies, which dominate the population of massive disk galaxies in the Coma core. We find that the measurement of a bar fraction among S0 galaxies must be handled with special care due to the difficulty in separating unbarred S0s from ellipticals, and the potential dilution of the bar signature by light from a relatively large, bright bulge. The results depend sensitively on the method used: the bar fraction for bright S0s in the Coma core is 50% {+-} 11%, 65% {+-} 11%, and 60% {+-} 11% based on three methods of bar detection, namely, strict ellipse fit criteria, relaxed ellipse fit criteria, and visual classification. (2) We compare the S0 bar fraction across different environments (the Coma core, A901/902, and Virgo) adopting the critical step of using matched samples and matched methods in order to ensure robust comparisons. We find that the bar fraction among bright S0 galaxies does not show a statistically significant variation (within the error bars of {+-}11%) across environments which span two orders of magnitude in galaxy number density (n {approx} 300-10,000 galaxies Mpc{sup -3}) and include rich and poor clusters, such as the core of Coma, the A901/902 cluster, and Virgo. We speculate that the bar fraction among S0s is not significantly enhanced in rich clusters compared to low-density environments for two reasons. First, S0s in rich clusters are less prone to bar instabilities as they are dynamically heated by harassment and are gas poor as a result of ram pressure stripping and accelerated star formation. Second, high-speed encounters in rich clusters may be less effective than slow, strong encounters in inducing bars. (3) We also take advantage of the high resolution of the ACS ({approx}50 pc) to analyze a sample of 333 faint (M{sub V} > -18) dwarf galaxies in the Coma core. Using visual inspection of unsharp-masked images, we find only 13 galaxies with bar and/or spiral structure. An additional eight galaxies show evidence for an inclined disk. The paucity of disk structures in Coma dwarfs suggests that either disks are not common in these galaxies or that any disks present are too hot to develop instabilities.

  4. BBHRP_poster_ARM08.ppt

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    models are likely. We examine: * The correlation of RFC errors between RRTM and the other models * The RFC rmse's for all models under different cloud conditions * The RFC absolute...

  5. River Corridor Closure Contract Section J, Attachment J-2 Contract No. DE-AC06-05RL14655 Modification 627

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 Contract No. DE-AC06-05RL14655 Modification 627 1 SECTION J, ATTACHMENT J-2 DOE DIRECTIVES APPLICABLE TO THE RIVER CORRIDOR CLOSURE CONTRACT The DOE Directives found in the following list constitute the List B - List of Applicable Directives, referenced in the Section I clause entitled Laws, Regulations, and DOE Directives. The Contractor should follow the established procedure to obtain relief from requirements of these directives where applicable. It is anticipated during the performance of

  6. Permanent Mold Casting of JIS-AC4C Aluminum Alloy Using a Low-Temperature Mold

    SciTech Connect (OSTI)

    Yamagata, Hiroshi; Nikawa, Makoto

    2011-01-17

    Permanent mold casting using mold temperatures below 200 deg. C was conducted to obtain a high-strength, thin-walled casting. Al-7.36 mass% Si -0.18 Cu- 0.27Mg-0.34Fe alloy JIS-AC4C was cast using a bottom pouring cast plan. The product had a rectangular tube shape (70 mm W x 68 mm D x 180 mm H) with wall thicknesses of 1, 3 and 5 mm. The effect of heat insulation at the melt path was compared when using a sand runner insert and when using a steel runner insert as well as a powder mold release agent. Fine microstructures were observed in the casting. The smaller the thickness, the higher the hardness with smaller secondary dendrite arm spacing (SDAS). However, the hardness and the SDAS were unaffected by the mold temperature. It was proposed that the avoidance of the formation of primary {alpha} dendrite at the melt path generates a higher strength casting with adequate mold filling.

  7. REFERENCE NO. OF DOCUMENT BEING CONTINUED AEO CONTINUATION SHEET DE-AC27-08RV14800/039 2AG O2

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    OTHER REFERENCE NO. OF DOCUMENT BEING CONTINUED AEO CONTINUATION SHEET DE-AC27-08RV14800/039 2AG O2 NAME OF OFFEROR OR CONTRACTOR WASHINGTON RIVER PROTECTION SOLUTIONS LLC QATT I NTPIEAON ITEM NO. SUPPLIESISERVICESQUNIYNT UITPCEAOT (A) (B) (C) (D) (E) (F) Fund 01050 Appr Year 2010 Allottee 34 Reporting Entity 421301 Amount: $43,752,060.00 Account code: P&B Rocky Flats Post Retirement Benefits Fund 01050 Appr Year 2010 Allottee 34 Reporting Entity 421301 Amount: $51,480,000.00 Account,_code:

  8. REFERENCE NO. OF DOCUMENT BEING CONTINUED AEO CONTINUATION SHEET DE-AC27-08RV14800/057 2G OF

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SHEET DE-AC27-08RV14800/057 2G OF NAME OF OFFEROR OR CO NTRACTOR WASHINGTON RIVER PROTECTION SOLUTIONS LLC________________ ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT (A) (B) (C) (D) (E) (F) NEW ACCOUNTING CODE ADDED: Account code: WRPS Spares Account Fund D1250 Appr Year 2010 Allottee 34 Reporting Entity 421301 Object Class 25200 Program 1110909 Project 0D01481 WFO D0DD0D0 Local Use 0421405 Amount: $1,80D,000.00 Account code: WEIPS Fund 01250 Appr Year 2010 Allottee 34 Reporting

  9. REFERENCE NO. OF DOCUMENT BEING CONTINUED AEO CONTINUATION SHEETI DE-AC27-08RV14800/075 [AG OF

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SHEETI DE-AC27-08RV14800/075 [AG OF NAME OF OFFEROR OR CONTRACTOR WASHINGTON RIVER PROTECTION SOLUTIONS LLC ITEM NO. SUPPLIES/SERVICES QUANTITY JNIT UNIT PRICE AMOUNT (A) j(B) (C) (D) (E) (F) Account code: Fund 01250 Appr Year 2ulu Allottee 34 Reporting Entity 421301 Object Class 25200 Program 1110909 Project 0001481 WFO 0000000 Local Use 0000000 Amount: $5,918,827.27 Account code: WTP Support Funding for RFS OWTPO1 Fund 01250 Appr Year 2010 Allottee 34 R eporting Entity 421301 uuj1JeLu

  10. Audit of Incurred Costs for UT-Battelle under Department of Energy Contract No. DE-AC05-00OR22725 during Fiscal Year 2012

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Audit Report Audit of Incurred Costs for UT- Battelle under Department of Energy Contract No. DE-AC05-00OR22725 during Fiscal Year 2012 OAS-M-14-05 April 2014 Department of Energy Washington, DC 20585 April 21, 2014 MEMORANDUM FOR THE MANAGER, OAK RIDGE NATIONAL LABORATORY SITE OFFICE FROM: Rickey R. Hass Deputy Inspector General for Audits and Inspections Office of Inspector General SUBJECT: INFORMATION: Audit Report on "Audit of Incurred Costs for UT- Battelle under Department of Energy

  11. Performance Evaluation Plan (PEP) Pantex Plant Babcock & Wilcox Technical Services Pantex, LLC Contract No. DE-AC54-00AL66620

    National Nuclear Security Administration (NNSA)

    2 Performance Evaluation Plan (PEP) Pantex Plant Babcock & Wilcox Technical Services Pantex, LLC Contract No. DE-AC54-00AL66620 October 1, 2011 to September 30, 2012 A. Pursuant to the terms and conditions of the Contract, this Performance Evaluation Plan (PEP) sets forth the criteria upon which the Contractor's performance of work under the contract will be evaluated and upon which the determination of the total available fee amount earned shall be based. B. The base PEP is composed of

  12. AC 95 - selected readings

    SciTech Connect (OSTI)

    1995-12-31

    Reports are presented on energy efficiency and conservation in residential buildings. Topics include housing and energy linkages; the people factor; low-income initiatives; green visions; utility programs; affordable comfort; housing as a system; and pressures and air flow in buildings.

  13. Development of a low-cost integrated 20-kW-AC solar tracking subarray for grid-connected PV power system applications. Final technical report

    SciTech Connect (OSTI)

    Stern, M.; Duran, G.; Fourer, G.; Mackamul, K.; Whalen, W.; Loo, M. van; West, R.

    1998-06-01

    This report chronicles Utility Power Group's (UPG) successful two-year Photovoltaic Manufacturing Technology (PVMaT) Phase 4A1 work effort which began in July, 1995. During this period, UPG completed design, fabrication, testing and demonstration of a modular and fully integrated 15-kW-ac, solar tracking PV power system sub-array. The two key and innovative components which were developed are a Modular Panel which optimizes factory assembly of PV modules into a large area, field-deployable, structurally-integrated PV panel, and an Integrated Power Processing Unit which combines all dc and ac power collection, conversion and control functions within a single, field-deployable structurally-integrated electrical enclosure. These two key sub-array elements, when combined with a number of other electrical, mechanical, and structural components, create a low-cost and high-performance PV power system. This system, or sub-array, can be deployed in individual units, or paralleled with any number of other sub-arrays, to construct multi-megawatt P fields. 21 figs.

  14. NSAC Subcommittee 2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    http://cyclotron.tamu.edu/nsac-2012-rfc/lib/tpl/default/images/favicon.ico

  15. Subunit compositions of Arabidopsis RNA polymerases I and III reveal Pol I- and Pol III-specific forms of the AC40 subunit and alternative forms of the C53 subunit

    SciTech Connect (OSTI)

    Ream, Thomas S.; Haag, Jeremy R.; Pontvianne, Frederic; Nicora, Carrie D.; Norbeck, Angela D.; Pasa-Tolic, Ljiljana; Pikaard, Craig S.

    2015-05-02

    Using affinity purification and mass spectrometry, we identified the subunits of Arabidopsis thaliana multisubunit RNA Polymerases I and III (abbreviated as Pol I and Pol III), providing the first description of their physical compositions in plants. AC40 and AC19 subunits are typically common to Pol I (a.k.a. Pol A) and Pol III (a.k.a. Pol C) and are encoded by single genes whose mutation, in humans, is a cause of the craniofacial disorder, Treacher-Collins Syndrome. Surprisingly, A. thaliana, and related species, express two distinct AC40 paralogs, one of which assembles into Pol I and the other of which assembles into Pol III. Changes at eight amino acid positions correlate with this functional divergence of Pol I and Pol III-specific AC40 paralogs. Two genes encode homologs of the yeast C53 subunit, and either variant can assemble into Pol III. By contrast, only one of two potential C17 variants, and one of two potential C31 variants were detected in Pol III. We introduce a new nomenclature system for plant Pol I and Pol III subunits in which the twelve subunits that are structurally and functionally homologous among Pols I through V are assigned equivalent numbers.

  16. Subunit compositions of Arabidopsis RNA polymerases I and III reveal Pol I- and Pol III-specific forms of the AC40 subunit and alternative forms of the C53 subunit

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Ream, Thomas S.; Haag, Jeremy R.; Pontvianne, Frederic; Nicora, Carrie D.; Norbeck, Angela D.; Pasa-Tolic, Ljiljana; Pikaard, Craig S.

    2015-05-02

    Using affinity purification and mass spectrometry, we identified the subunits of Arabidopsis thaliana multisubunit RNA Polymerases I and III (abbreviated as Pol I and Pol III), providing the first description of their physical compositions in plants. AC40 and AC19 subunits are typically common to Pol I (a.k.a. Pol A) and Pol III (a.k.a. Pol C) and are encoded by single genes whose mutation, in humans, is a cause of the craniofacial disorder, Treacher-Collins Syndrome. Surprisingly, A. thaliana, and related species, express two distinct AC40 paralogs, one of which assembles into Pol I and the other of which assembles into Polmore » III. Changes at eight amino acid positions correlate with this functional divergence of Pol I and Pol III-specific AC40 paralogs. Two genes encode homologs of the yeast C53 subunit, and either variant can assemble into Pol III. By contrast, only one of two potential C17 variants, and one of two potential C31 variants were detected in Pol III. We introduce a new nomenclature system for plant Pol I and Pol III subunits in which the twelve subunits that are structurally and functionally homologous among Pols I through V are assigned equivalent numbers.« less

  17. Slide 1

    Energy Savers [EERE]

    PJM©2011 www.pjm.com Congestion and the PJM Regional Transmission Expansion Plan H. Charles Liebold PJM Interconnection Manager, Interregional Planning December 6, 2011 DOE Workshop PJM©2011 2 21% of U.S. GDP produced in PJM PJM as Part of the Eastern Interconnection with ATSI & Duke Integration KEY STATISTICS PJM member companies 750+ millions of people served 61 peak load in megawatts 162,230 MWs of generating capacity 184,992 miles of transmission lines 62,214 GWh of annual energy

  18. Development of a low cost integrated 15 kW A.C. solar tracking sub-array for grid connected PV power system applications

    SciTech Connect (OSTI)

    Stern, M.; West, R.; Fourer, G.; Whalen, W.; Van Loo, M.; Duran, G.

    1997-02-01

    Utility Power Group has achieved a significant reduction in the installed cost of grid-connected PV systems. The two part technical approach focused on (1) The utilization of a large area factory assembled PV panel, and (2) The integration and packaging of all sub-array power conversion and control functions within a single factory produced enclosure. Eight engineering prototype 15kW ac single axis solar tracking sub-arrays were designed, fabricated, and installed at the Sacramento Municipal Utility District{close_quote}s Hedge Substation site in 1996 and are being evaluated for performance and reliability. A number of design enhancements will be implemented in 1997 and demonstrated by the field deployment and operation of over twenty advanced sub-array PV power systems. {copyright} {ital 1997 American Institute of Physics.}

  19. EKPC

    Office of Environmental Management (EM)

    East Kentucky Power Cooperative Team Cumberland March 25, 2015 EKPC Service Area Lake Cumberland Area PJM Service Area East Kentucky Power Cooperative PJM Contour Map Real-time 5 Min Market Price $/MWh from March 19

  20. PJMDOCS-#501543-v1-DOE_Congestion_Workshop_9_17_08_-_MJK.DOC

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Workshop on 2009 Congestion Study September 17, 2008 Chicago, Illinois Statement of Michael J. Kormos Senior Vice President-Operations PJM Interconnection, L.L.C. PJM©2008 Page 2 of 5 PJM Interconnection, L.L.C. ("PJM") is pleased to provide these preliminary comments for consideration as the Department prepares to commence its next triennial congestion study. In 2005 and 2006, PJM submitted a great deal of information for the public record concerning the reliability and congestion

  1. Application for presidential permit OE Docket No. PP-230-4 International

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission Company: Response of PJM Interconnection, L.L.C. to Answer of International Transmission Company | Department of Energy Response of PJM Interconnection, L.L.C. to Answer of International Transmission Company Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response of PJM Interconnection, L.L.C. to Answer of International Transmission Company Response of PJM Interconnection, L.L.C. to Answer of International Transmission Company on

  2. Application for presidential permit OE Docket No. PP-230-4 International

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission Company: Response to Late Motion to Intervene from PJM Interconnection LLC | Department of Energy from PJM Interconnection LLC Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to Late Motion to Intervene from PJM Interconnection LLC Response from International Transmission Company to late motion to intervene from PJM Interconnection in the matter of the application for a presidential permit authorizing International

  3. Developing 226Ra and 227Ac age-dating techniques for nuclear forensics to gain insight from concordant and non-concordant radiochronometers

    SciTech Connect (OSTI)

    Kayzar, Theresa M.; Williams, Ross W.

    2015-09-26

    The model age or ‘date of purification’ of a nuclear material is an important nuclear forensic signature. In this study, chemical separation and MC-ICP-MS measurement techniques were developed for 226 Ra and 227Ac: grand-daughter nuclides in the 238U and 235U decay chains respectively. The 230Th-234U, 226Ra-238U, 231Pa-235U, and 227Ac-235U radiochronometers were used to calculate model ages for CRM-U100 standard reference material and two highly-enriched pieces of uranium metal from the International Technical Working Group Round Robin 3 Exercise. In conclusion, the results demonstrate the accuracy of the 226Ra-238U and 227Ac-235U chronometers and provide information about nuclide migration during uranium processing.

  4. THE STAR FORMATION HISTORY OF THE VERY METAL-POOR BLUE COMPACT DWARF I Zw 18 FROM HST/ACS DATA

    SciTech Connect (OSTI)

    Annibali, F.; Cignoni, M.; Tosi, M.; Clementini, G.; Contreras Ramos, R.; Fiorentino, G.; Van der Marel, R. P.; Aloisi, A.; Marconi, M.; Musella, I.

    2013-12-01

    We have derived the star formation history (SFH) of the blue compact dwarf galaxy I Zw 18 through comparison of deep HST/ACS data with synthetic color-magnitude diagrams (CMDs). A statistical analysis was implemented for the identification of the best-fit SFH and relative uncertainties. We confirm that I Zw 18 is not a truly young galaxy, having started forming stars earlier than ?1 Gyr ago, and possibly at epochs as old as a Hubble time. In I Zw 18's main body we infer a lower limit of ?2 10{sup 6} M {sub ?} for the mass locked up in old stars. I Zw 18's main body has been forming stars very actively during the last ?10 Myr, with an average star formation rate (SFR) as high as ?1 M {sub ?} yr{sup 1} (or ?2 10{sup 5} M {sub ?} yr{sup 1} pc{sup 2}). On the other hand, the secondary body was much less active at these epochs, in agreement with the absence of significant nebular emission. The high current SFR can explain the very blue colors and the high ionized gas content in I Zw 18, resembling primeval galaxies in the early universe. Detailed chemical evolution models are required to quantitatively check whether the SFH from the synthetic CMDs can explain the low measured element abundances, or if galactic winds with loss of metals are needed.

  5. Support for a special symposium to highlight the research of early career women physical chemists at the 2011 fall ACS nationall meeting, Aug 28-Sept

    SciTech Connect (OSTI)

    Geraldine Richmond

    2012-12-19

    The symposium was well attended during the 4-day symposium. The invited speakers were primarily women in early career stage (~4-8 years) with a few senior women and men as invited speakers or session chairs. Included in each day was a Poster Session for graduate students and a lunch in which the turn out was strong and the posters presented encouraged much of dialogue with the invited speakers, guests and others attending the ACS meeting and wanted to discuss the student???????????????¢????????????????????????????????s research and meet with the speakers. Most all speakers and participants were very positive about the sessions and expressed that the funding to cover some expenses made it possible for them to attend the conference and the poster session luncheon. There was a total of 51 presenters, below are the speakers and their abstracts, in order presented:

  6. Selection Tests of MnZn and NiZn Ferrites for Mu2e 300 kHz and 5.1 MHz AC Dipoles

    SciTech Connect (OSTI)

    Bourkland, K.; Elementi, L.; Feher, S.; Harding, D.J.; Kashikhin, V.S.; Makarov, A.; Pfeffer, H.; Velev, G.V.; Mulushev, E.; Iedmeska, I.; Venturini, M.; /Pisa U.

    2011-09-09

    Mu2e, a charged lepton flavor violation (CLFV) experiment is planned to start at Fermilab late in this decade. The proposed experiment will search for neutrinoless muon to electron conversions with unprecedented sensitivity, better than 6 x 10{sup -17 }at 90% CL. To achieve this sensitivity the incoming proton beam must be highly suppressed during the window for detecting the muon decays. The current proposal for beam extinction is based on a collimator design with two dipoles running at {approx}300 kHz and 5.1 MHz and synchronized to the proton bunch spacing. The appropriate choice of ferrite material for the magnet yoke is a critical step in the overall design of the dipoles and their reliable operation at such high frequencies over the life of the experiment. This choice, based on a series of the thermal and magnetic measurements of the ferrite samples, is discussed in the paper. Additionally, the first results from the testing at 300 kHz of a prototype AC dipole are presented.

  7. PJM©2012

    Gasoline and Diesel Fuel Update (EIA)

    2 1 www.pjm.com Markets, Regulation and Energy Storage: A Match Made in Heaven? EIA 2013 Energy Conference June 17, 2013 Craig Glazer Vice President PJM Interconnection PJM©2012 2 www.pjm.com "We're Mad as Hell and We're Not Going to Take It Anymore!" PJM©2012 3 www.pjm.com * Need slide that is black. PJM©2012 4 www.pjm.com And What Were They Mad About??? At the Wholesale Level... * Transmission access - Negotiation of "wheeling rights" - Discriminatory treatment - Lengthy

  8. Investigation of magnetic spin glass property in La{sub 0.5}Bi{sub 0.5}MnO{sub 3} sample using non-linear AC susceptibility measurements

    SciTech Connect (OSTI)

    Kumar, Punith V. Manju, M. R. Dayal, Vijaylakshmi

    2014-04-24

    We present a comprehensive study on origin of Spin Glass (SG) property in polycrystalline La{sub 0.5}Bi{sub 0.5}MnO{sub 3} perovskite oxide using linear and higher order ac susceptibility (?) measurements. The third order harmonic susceptibility (?{sub 3}) vs. temperature (K) with varying magnetic fields from 0.95 to 9.45 Oe and the divergence in their ?{sub 3} (max) allows us to infer the SG behavior occurring in the sample possibly due to co-operative freezing of the spins.

  9. ac_household2001.pdf

    Gasoline and Diesel Fuel Update (EIA)

    Air Conditioning Tables (Million U.S. Households; 24 pages, 138 kb) Contents Pages HC4-1a. Air Conditioning by Climate Zone, Million U.S. Households, 2001 2 HC4-2a. Air Conditioning by Year of Construction, Million U.S. Households, 2001 2 HC4-3a. Air Conditioning by Household Income, Million U.S. Households, 2001 2 HC4-4a. Air Conditioning by Type of Housing Unit, Million U.S. Households, 2001 2 HC4-5a. Air Conditioning by Type of Owner-Occupied Housing Unit, Million U.S. Households, 2001 2

  10. ac_household2001.pdf

    Gasoline and Diesel Fuel Update (EIA)

    0a. Air Conditioning by Midwest Census Region, Million U.S. Households, 2001 Air Conditioning Characteristics RSE Column Factor: Total U.S. Midwest Census Region RSE Row Factors Total Census Division East North Central West North Central 0.5 1.0 1.2 1.4 Households With Electric Air-Conditioning Equipment ...................... 82.9 20.5 13.6 6.8 2.2 Air Conditioners Not Used ........................... 2.1 0.3 Q Q 27.5 Households Using Electric Air-Conditioning 1

  11. ac_household2001.pdf

    Gasoline and Diesel Fuel Update (EIA)

    1a. Air Conditioning by South Census Region, Million U.S. Households, 2001 Air Conditioning Characteristics RSE Column Factor: Total U.S. South Census Region RSE Row Factors Total Census Division South Atlantic East South Central West South Central 0.5 0.8 1.2 1.3 1.4 Households With Electric Air-Conditioning Equipment ...................... 82.9 37.2 19.3 6.4 11.5 1.5 Air Conditioners Not Used ........................... 2.1 0.4 Q Q Q 28.2 Households Using Electric Air-Conditioning 1

  12. ac_household2001.pdf

    Gasoline and Diesel Fuel Update (EIA)

    2a. Air Conditioning by West Census Region, Million U.S. Households, 2001 Air Conditioning Characteristics RSE Column Factor: Total U.S. West Census Region RSE Row Factors Total Census Division Mountain Pacific 0.4 1.2 1.7 1.4 Households With Electric Air-Conditioning Equipment ...................... 82.9 10.7 3.4 7.2 7.1 Air Conditioners Not Used ........................... 2.1 1.1 0.2 0.9 15.5 Households Using Electric Air-Conditioning 1 ........................................ 80.8 9.6 3.2

  13. ac_household2001.pdf

    Gasoline and Diesel Fuel Update (EIA)

    a. Air Conditioning by Climate Zone, Million U.S. Households, 2001 Air Conditioning Characteristics RSE Column Factor: Total Climate Zone 1 RSE Row Factors Fewer than 2,000 CDD and -- 2,000 CDD or More and Fewer than 4,000 HDD More than 7,000 HDD 5,500 to 7,000 HDD 4,000 to 5,499 HDD Fewer than 4,000 HDD 0.4 2.1 1.0 0.9 1.5 1.0 Total Households With Air-Conditioning ........................... 82.9 5.4 20.9 20.2 14.2 22.1 8.1 Air Conditioners Not Used ............ 2.1 Q 0.4 0.3 0.8 0.4 23.2

  14. ac_household2001.pdf

    Gasoline and Diesel Fuel Update (EIA)

    2a. Air Conditioning by Year of Construction, Million U.S. Households, 2001 Air Conditioning Characteristics RSE Column Factor: Total Year of Construction RSE Row Factors 1990 to 2001 1 1980 to 1989 1970 to 1979 1960 to 1969 1950 to 1959 1949 or Before 0.4 1.6 1.2 1.1 1.2 1.1 0.9 Households With Electric Air-Conditioning Equipment ........ 82.9 13.6 16.0 14.7 10.4 10.5 17.6 4.7 Air Conditioners Not Used ............ 2.1 Q 0.3 0.5 0.3 0.4 0.5 27.2 Households Using Electric Air-Conditioning 2

  15. ac_household2001.pdf

    Gasoline and Diesel Fuel Update (EIA)

    4a. Air Conditioning by Type of Housing Unit, Million U.S. Households, 2001 Air Conditioning Characteristics RSE Column Factor: Total Type of Housing Unit RSE Row Factors Single-Family Apartments in Buildings With Mobile Home Two to Four Units Five or More Units 0.4 0.6 1.5 1.4 1.8 Households With Electric Air-Conditioning Equipment ........ 82.9 58.7 6.5 12.4 5.3 4.9 Air Conditioners Not Used ............ 2.1 1.1 Q 0.6 Q 21.8 Households Using Electric Air-Conditioning 1

  16. ac_household2001.pdf

    Gasoline and Diesel Fuel Update (EIA)

    5a. Air Conditioning by Type of Owner-Occupied Housing Unit, Million U.S. Households, 2001 Air Conditioning Characteristics RSE Column Factor: Total Owner- Occupied Units Type of Owner-Occupied Housing Unit RSE Row Factors Single-Family Apartments in Buildings With Mobile Home Two to Four Units Five or More Units 0.5 0.5 1.5 1.4 1.8 Households With Electric Air-Conditioning Equipment ........ 59.5 58.7 6.5 12.4 5.3 5.2 Air Conditioners Not Used ............ 1.2 1.1 Q 0.6 Q 23.3 Households Using

  17. ac_household2001.pdf

    Gasoline and Diesel Fuel Update (EIA)

    6a. Air Conditioning by Type of Rented Housing Unit, Million U.S. Households, 2001 Air Conditioning Characteristics RSE Column Factor: Total Rented Units Type of Rented Housing Unit RSE Row Factors Single-Family Apartments in Buildings With Mobile Home Two to Four Units Five or More Units 0.8 0.5 1.4 1.2 1.6 Households With Electric Air-Conditioning Equipment ........ 23.4 58.7 6.5 12.4 5.3 6.1 Air Conditioners Not Used ............ 0.9 1.1 Q 0.6 Q 23.0 Households Using Electric Air-Conditioning

  18. ac_household2001.pdf

    Gasoline and Diesel Fuel Update (EIA)

    2001 Air Conditioning Characteristics RSE Column Factor: Total U.S. Four Most Populated States RSE Row Factors New York California Texas Florida 0.4 1.1 1.7 1.2 1.2 Households With Electric Air-Conditioning Equipment ...................... 82.9 4.9 6.0 7.4 6.2 2.4 Air Conditioners Not Used ........................... 2.1 0.1 0.8 Q 0.1 23.2 Households Using Electric Air-Conditioning 1 ........................................ 80.8 4.7 5.2 7.4 6.1 2.6 Type of Electric Air-Conditioning Used Central

  19. ac_household2001.pdf

    Gasoline and Diesel Fuel Update (EIA)

    8a. Air Conditioning by Urban/Rural Location, Million U.S. Households, 2001 Air Conditioning Characteristics RSE Column Factor: Total Urban/Rural Location 1 RSE Row Factors City Town Suburbs Rural 0.5 0.8 1.4 1.3 1.4 Households With Electric Air-Conditioning Equipment ...................... 82.9 36.8 13.6 18.9 13.6 4.3 Air Conditioners Not Used ........................... 2.1 1.2 0.2 0.4 0.3 21.4 Households Using Electric Air-Conditioning 2 ........................................ 80.8 35.6 13.4

  20. ac_household2001.pdf

    Gasoline and Diesel Fuel Update (EIA)

    9a. Air Conditioning by Northeast Census Region, Million U.S. Households, 2001 Air Conditioning Characteristics RSE Column Factor: Total U.S. Northeast Census Region RSE Row Factors Total Census Division Middle Atlantic New England 0.5 1.0 1.2 1.8 Households With Electric Air-Conditioning Equipment ...................... 82.9 14.5 11.3 3.2 3.3 Air Conditioners Not Used ........................... 2.1 0.3 0.3 Q 28.3 Households Using Electric Air-Conditioning 1

  1. Low frequency ac waveform generator

    DOE Patents [OSTI]

    Bilharz, O.W.

    1983-11-22

    Low frequency sine, cosine, triangle and square waves are synthesized in circuitry which allows variation in the waveform amplitude and frequency while exhibiting good stability and without requiring significant stablization time. A triangle waveform is formed by a ramped integration process controlled by a saturation amplifier circuit which produces the necessary hysteresis for the triangle waveform. The output of the saturation circuit is tapped to produce the square waveform. The sine waveform is synthesized by taking the absolute value of the triangular waveform, raising this absolute value to a predetermined power, multiplying the raised absolute value of the triangle wave with the triangle wave itself and properly scaling the resultant waveform and subtracting it from the triangular waveform to a predetermined power and adding the squared waveform raised to the predetermined power with a DC reference and subtracting the squared waveform therefrom, with all waveforms properly scaled. The resultant waveform is then multiplied with a square wave in order to correct the polarity and produce the resultant cosine waveform.

  2. Low frequency AC waveform generator

    DOE Patents [OSTI]

    Bilharz, Oscar W. (Scotia, NY)

    1986-01-01

    Low frequency sine, cosine, triangle and square waves are synthesized in circuitry which allows variation in the waveform amplitude and frequency while exhibiting good stability and without requiring significant stabilization time. A triangle waveform is formed by a ramped integration process controlled by a saturation amplifier circuit which produces the necessary hysteresis for the triangle waveform. The output of the saturation circuit is tapped to produce the square waveform. The sine waveform is synthesized by taking the absolute value of the triangular waveform, raising this absolute value to a predetermined power, multiplying the raised absolute value of the triangle wave with the triangle wave itself and properly scaling the resultant waveform and subtracting it from the triangular waveform itself. The cosine is synthesized by squaring the triangular waveform, raising the triangular waveform to a predetermined power and adding the squared waveform raised to the predetermined power with a DC reference and subtracting the squared waveform therefrom, with all waveforms properly scaled. The resultant waveform is then multiplied with a square wave in order to correct the polarity and produce the resultant cosine waveform.

  3. ac_household2001.pdf

    U.S. Energy Information Administration (EIA) Indexed Site

    RSE Column Factor: Total 2001 Household Income Below Poverty Line Eli- gible for Fed- eral ... RSE Column Factor: Total 2001 Household Income Below Poverty Line Eli- gible for Fed- eral ...

  4. 189,"Alabama Electric Coop Inc",1,"Lowman","Chatom",100,19.94,"OH","AC",230,230,1351.5,"ACSR","Single",1,1,"Wooden H-Frame",500

    U.S. Energy Information Administration (EIA) Indexed Site

    189,"Alabama Electric Coop Inc",1,"Lowman","Chatom",100,19.94,"OH","AC",230,230,1351.5,"ACSR","Single",1,1,"Wooden H-Frame",500 189,"Alabama Electric Coop Inc",2,"Chatom","Waynesboro",42.7,32.11,"OH","AC",230,230,1351.5,"ACSR","Single",1,1,"Wooden H-Frame",469 189,"Alabama Electric Coop

  5. 189,"Alabama Electric Coop Inc",1,"Lowman","Chatom",100,19.94,"OH","AC",230,230,1351.5,"ACSR","Single",1,1,"Wooden H-Frame",500

    U.S. Energy Information Administration (EIA) Indexed Site

    189,"Alabama Electric Coop Inc",1,"Lowman","Chatom",100,19.94,"OH","AC",230,230,1351.5,"ACSR","Single",1,1,"Wooden H-Frame",500 189,"Alabama Electric Coop Inc",2,"Chatom","Waynesboro",42.7,32.11,"OH","AC",230,230,1351.5,"ACSR","Single",1,1,"Wooden H-Frame",469 189,"Alabama Electric Coop

  6. Prospect Corporation | Open Energy Information

    Open Energy Info (EERE)

    Id 15432 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes Activity Distribution Yes This article is a stub. You can help OpenEI by expanding it. Utility Rate...

  7. Dublin Municipal Electric Util | Open Energy Information

    Open Energy Info (EERE)

    Yes Ownership M NERC Location RFC NERC RFC Yes Activity Distribution Yes Activity Wholesale Marketing Yes This article is a stub. You can help OpenEI by expanding it. Utility...

  8. Borough of Girard, Pennsylvania (Utility Company) | Open Energy...

    Open Energy Info (EERE)

    2010 - File1a1 EIA Form 861 Data Utility Id 7256 Utility Location Yes Ownership M NERC Location RFC NERC ERCOT Yes NERC RFC Yes Activity Retail Marketing Yes This article is a...

  9. Village of Centuria, Wisconsin (Utility Company) | Open Energy...

    Open Energy Info (EERE)

    EIA-861 Final Data File for 2010 - File1a1 EIA Form 861 Data Utility Id 3298 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes Activity Buying Transmission Yes...

  10. Village of Wharton, Ohio (Utility Company) | Open Energy Information

    Open Energy Info (EERE)

    - File1a1 EIA Form 861 Data Utility Id 20471 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes Activity Distribution Yes Activity Retail Marketing Yes This...

  11. Village of Georgetown, Ohio (Utility Company) | Open Energy Informatio...

    Open Energy Info (EERE)

    2010 - File1a1 EIA Form 861 Data Utility Id 7131 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes Activity Retail Marketing Yes This article is a stub. You can...

  12. Village of Carey, Ohio (Utility Company) | Open Energy Information

    Open Energy Info (EERE)

    EIA-861 Final Data File for 2010 - File1a1 EIA Form 861 Data Utility Id 3008 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes Activity Distribution Yes Activity...

  13. CinCap IV, LLC | Open Energy Information

    Open Energy Info (EERE)

    861 Data Utility Id 3575 Utility Location Yes Ownership W NERC Location RFC NERC RFC Yes ISO NE Yes Activity Wholesale Marketing Yes This article is a stub. You can help OpenEI by...

  14. Village of Eldorado, Ohio (Utility Company) | Open Energy Information

    Open Energy Info (EERE)

    861 Data Utility Id 5752 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes ISO MISO Yes Activity Buying Transmission Yes Activity Distribution Yes This article is a...

  15. Miami Power Corporation | Open Energy Information

    Open Energy Info (EERE)

    Data Utility Id 12323 Utility Location Yes Ownership I NERC Location RFC NERC RFC Yes ISO MISO Yes Activity Transmission Yes This article is a stub. You can help OpenEI by...

  16. CECG Maine, LLC | Open Energy Information

    Open Energy Info (EERE)

    4166 Utility Location Yes Ownership R NERC Location RFC NERC RFC Yes Activity Retail Marketing Yes This article is a stub. You can help OpenEI by expanding it. Utility Rate...

  17. CinCap V LLC | Open Energy Information

    Open Energy Info (EERE)

    Location Yes Ownership W NERC Location RFC NERC RFC Yes ISO NE Yes Activity Wholesale Marketing Yes This article is a stub. You can help OpenEI by expanding it. Utility Rate...

  18. NSAC Subcommittee 2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    cyclotron.tamu.edu/nsac-2012-rfc/ 2016-03-13T09:18:33-05:00 NSAC Subcommittee 2012 http://cyclotron.tamu.edu/nsac-2012-rfc/ http://cyclotron.tamu.edu/nsac-2012-rfc/lib/tpl/drupal-garland-blue/images/favicon.ico text/html 2012-05-19T16:31:30-05:00 burch default_sidebar_left http://cyclotron.tamu.edu/nsac-2012-rfc/doku.php/default_sidebar_left?rev=1337463090&do=diff * Index * GEN * LEP * RHI * MEP * FSN * THE * FAC text/html 2012-05-19T16:30:41-05:00 burch rfc:mep - created

  19. Application for Presidential Permit OE Docket No. PP-230-4 International

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission Company: PJM Letter filed Dec 8, 2011 in support of Settlement Agreement | Department of Energy PJM Letter filed Dec 8, 2011 in support of Settlement Agreement Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: PJM Letter filed Dec 8, 2011 in support of Settlement Agreement Application from International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S - Canada border. PDF icon

  20. PJM©2011

    Gasoline and Diesel Fuel Update (EIA)

    1 www.pjm.com 2011 EIA Energy Conference Intelligent Electric Systems Andy Ott Senior Vice President - Markets April 26, 2011 PJM©2011 2 Smart Grid www.pjm.com Transmission Distribution Energy Users Network Operations Energy Providers Consumer Devices PJM©2011 3 Network Operations Generation and Demand Resource Control www.pjm.com PJM©2011 4 Future SynchroPhasor Applications * Use recorded data * Verification of operations * Analyze dynamic performance * System model maintenance * Situational

  1. Optimal_Performance_of_Hybrid_Generation_2011-05-24

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ......... 26 Exhibit 10 Real-Time Locational Marginal Price (PJM 912009 ... (3) where ( ) t is real-time locational marginal price, ( ) ch P t is ...

  2. OPSI Annual Meeting

    Broader source: Energy.gov [DOE]

    The Organization of PJM States, Inc. (OPSI) is hosting its annual meeting with sessions covering clean power, gas and electric coordination, and more.

  3. OPSI Annual Meeting

    Broader source: Energy.gov [DOE]

    The Organization of PJM States, Inc. (OPSI) is hosting its annual meeting in Chicago, IL, on October 13-14, 2014.

  4. Electricity Advisory Committee Meeting Presentations June 2014...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Doug Larson, WIEB Steve Beuning, Xcel Carrie Cullen Hitt, SEIA PDF icon Presentation - ... Kormos, PJM PDF icon Panel Presentation - Carrie Cullen Hitt, SEIA More Documents & ...

  5. City of Franklin, Virginia (Utility Company) | Open Energy Information

    Open Energy Info (EERE)

    Data Utility Id 6715 Utility Location Yes Ownership M NERC Location SERC NERC SERC Yes RTO PJM Yes Operates Generating Plant Yes Activity Generation Yes Activity Distribution Yes...

  6. Kentucky Utilities Co | Open Energy Information

    Open Energy Info (EERE)

    EIA Form 861 Data Utility Id 10171 Utility Location Yes Ownership I NERC SERC Yes RTO PJM Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes...

  7. Town of Culpeper, Virginia (Utility Company) | Open Energy Information

    Open Energy Info (EERE)

    Data Utility Id 4619 Utility Location Yes Ownership M NERC Location SERC NERC SERC Yes RTO PJM Yes Operates Generating Plant Yes Activity Generation Yes Activity Distribution Yes...

  8. North Carolina El Member Corp | Open Energy Information

    Open Energy Info (EERE)

    Data Utility Id 13683 Utility Location Yes Ownership C NERC Location SERC NERC SERC Yes RTO PJM Yes Operates Generating Plant Yes Activity Generation Yes Activity Buying...

  9. United States Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Maryland Electric Cooperative, Potomac Electric Power Co., the PJM Interconnection, NRG Energy and Exelon Generation or Exelon Corp. dating from April 7, 2015 to June 4,...

  10. Ex Parte Communication, Docket EERE-2012-BT-STD-0022

    Broader source: Energy.gov [DOE]

    On November 16, 2012, representatives from PJM Interconnection LLC, National Rural Electric Cooperatives Association, Edison Electric Institute, American Public Power Association, Rheem and the...

  11. AP-3-B Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3-B Wholesale Power Rate Schedule AP-3-B Wholesale Power Rate Schedule Area: American ... American Electric Power Service Corporation (hereinafter called the Company), PJM ...

  12. Project Award Spreadsheets 2010 12 21 1232.xlsx

    Energy Savers [EERE]

    Interconnection Organization Recovery Act Funding PJM Interconnection, LLC 16,000,000 The National Association of Regulatory Utility Commissioners (NARUC) 14,000,000 Western...

  13. City of Alexandria's Application for Rehearing | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    at Mirant's Potomac River Generating Station and Proposed Mirant Compliance Plan Pepco and PJM Interconnection Comments on District of Columbia Public Service Commission, ...

  14. Ex Parte Communication, Docket EERE-2012-BT-STD-0022

    Broader source: Energy.gov [DOE]

    On September 21, 2014, representatives from PJM, NRECA, and Ogilvy Government Relations (Parties) met with Department of Energy staff concerning the proposed rulemaking referenced in the subject...

  15. Application for presidential permit OE Docket No. PP-230-4 Internation...

    Office of Environmental Management (EM)

    from PJM Interconnection LLC Application for Presidential permit OE Docket No. PP-230-4 International Transmission Company: Response of New York Transmission Owners to ITC...

  16. Application for presidential permit OE Docket No. PP-230-4 Internation...

    Energy Savers [EERE]

    of PJM Interconnection, L.L.C. to Answer of International Transmission Company dba ITC Transmission and Supplemental Comments on Behalf of the Midwest Independent...

  17. A/C Model Development and Validation

    Broader source: Energy.gov [DOE]

    2013 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting

  18. Template for Electronic Submission to ACS Journals

    Office of Scientific and Technical Information (OSTI)

    ... Bowers M. T. Ed., Academic Press, New York, N. Y. 1979, vol 2, p 87. (43) a) Thompson, M. ... Chem. 1982, 33, 493. Blanksby, S. J.; Ellison, G. B. Acc. Chem. Res. 2003, 36, 255. (44). ...

  19. A9R72AC.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

  20. Princeton Plasma Physics Lab - AC power

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    p>

    For tips on protecting the cathode, GE has been studying PPPL's use of liquid lithium to prevent damage to the divertor that exhausts heat in fusion facilities. The...

  1. Template for Electronic Submission to ACS Journals

    Office of Scientific and Technical Information (OSTI)

    ... This fits well with the observations described in Fig. 3 and 4. We further explore the ... Trapping in Ultrathin Hafnium Oxide. IEEE Electron Device Lett. 2002, 23, 597-599. ...

  2. DE-AC27- IORVI15051

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    IORVI15051 Modification MO 13 Page 2 of 2 A. The purpose of this modification is to revise Section C, Estimated American Recovery and Reinvestment Act (ARRA) (Modification AOO 1) project nomenclature. This modification makes the following change: From: ESTI.MA TED ARRA WORK TO BE PERFORMED The following estimated work shall be Performed in accordance with the rules and regulations under the American Recovery and Reinvestment Act of 2 009, Pub. L. 1115 (Recovery Act). TOTAL ESTIMTED ARRA PROJECTS

  3. Reduced AC losses in HTS coated conductors

    DOE Patents [OSTI]

    Ashworth, Stephen P.

    2004-10-05

    Methods for reducing hysteresis losses in superconductor coated ribbons where a flux distribution is set into the superconductor coated ribbon prior to the application of alternating current.

  4. Renewable Fuels Consulting | Open Energy Information

    Open Energy Info (EERE)

    Consulting Jump to: navigation, search Name: Renewable Fuels Consulting Place: Mason City, Iowa Sector: Renewable Energy Product: RFC specializes in providing technical solutions...

  5. 807,"Arkansas Electric Corp",11,"Fitzhugh","OG&E North",100,0.67,"OH","AC",69,161,954,"ACSR","Other",1,1,"Wooden H-Frane",300,1100,86600,46000,90000,223700,"application/vnd.ms-excel"

    U.S. Energy Information Administration (EIA) Indexed Site

    ,"LAND_LAND RIGHT_COSTS(DOLLARS)","POLE_TOWER_FIXTURE_COSTS(DOLLARS)","CONDUCTOR_DEVICE_COSTS(DOLLARS)","CONSTRUCTION_OTHER_COSTS(DOLLARS)","TOTAL_LINE_COST(DOLLARS)","IN_SERVICE_DATE" 807,"Arkansas Electric Corp",11,"Fitzhugh","OG&E North",100,0.67,"OH","AC",69,161,954,"ACSR","Other",1,1,"Wooden

  6. Microsoft Word - July Heat 7-18 v3

    Gasoline and Diesel Fuel Update (EIA)

    at reduced capacity today. System alerts: New York's grid operator called on emergency demand response for a second day in a row. ISO-New England and PJM continued appeals for...

  7. Microsoft Word - July Heat 7-19 v3

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    at reduced capacity today. System alerts: New York's grid operator called on emergency demand response for a third day in a row while PJM did so yesterday for its central Ohio...

  8. U

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Michael J. Kormos, Senior Vice President-Operations, PJM Interconnection Honorable Douglas Nazarian, Chairman, Maryland Public Service Commission 10:00 - 10:15 am Break 10:15 - ...

  9. Sandia National Laboratories Briefing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    system stability Possible loss of DG during disturbances 5 Low voltages in the Philadelphia area due to simulated HV fault (Source: PJM) Minimum VFRT for DER Why do we...

  10. Ex Parte Communication, Docket EERE-2012-BT-STD-0022

    Broader source: Energy.gov [DOE]

    On April 19, 2013, representatives from PJM Interconnection LLC and the National Rural Electric Cooperatives Association held a phone call with members of the Department of Energy’s General Counsel...

  11. HQ Energy Services (US), Inc | Open Energy Information

    Open Energy Info (EERE)

    Data Utility Id 21249 Utility Location Yes Ownership W NERC Location NPCC NERC NPCC Yes RTO PJM Yes ISO NY Yes ISO MISO Yes ISO NE Yes Activity Generation Yes Activity Buying...

  12. Northern Virginia Elec Coop | Open Energy Information

    Open Energy Info (EERE)

    Data Utility Id 13640 Utility Location Yes Ownership C NERC Location SERC NERC SERC Yes RTO PJM Yes Activity Distribution Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes This...

  13. Town of Windsor, North Carolina (Utility Company) | Open Energy...

    Open Energy Info (EERE)

    Data Utility Id 20811 Utility Location Yes Ownership M NERC Location SERC NERC SERC Yes RTO PJM Yes Activity Distribution Yes This article is a stub. You can help OpenEI by...

  14. Liberty Power Corp. | Open Energy Information

    Open Energy Info (EERE)

    Form 861 Data Utility Id 55781 Utility Location Yes Ownership R ISO CA Yes ISO Ercot Yes RTO PJM Yes ISO NY Yes ISO MISO Yes ISO NE Yes Activity Retail Marketing Yes This article...

  15. Northern Neck Elec Coop, Inc | Open Energy Information

    Open Energy Info (EERE)

    Data Utility Id 13762 Utility Location Yes Ownership C NERC Location SERC NERC SERC Yes RTO PJM Yes Activity Distribution Yes This article is a stub. You can help OpenEI by...

  16. Community Electric Coop | Open Energy Information

    Open Energy Info (EERE)

    Data Utility Id 4117 Utility Location Yes Ownership C NERC Location SERC NERC SERC Yes RTO PJM Yes Activity Distribution Yes This article is a stub. You can help OpenEI by...

  17. Hudson Energy Services | Open Energy Information

    Open Energy Info (EERE)

    2010 - File1a1 EIA Form 861 Data Utility Id 55878 Utility Location Yes Ownership R RTO PJM Yes ISO NY Yes Activity Retail Marketing Yes This article is a stub. You can help...

  18. MC Squared Energy Services, LLC | Open Energy Information

    Open Energy Info (EERE)

    2010 - File1a1 EIA Form 861 Data Utility Id 56379 Utility Location Yes Ownership R RTO PJM Yes Operates Generating Plant Yes Activity Retail Marketing Yes This article is a...

  19. Rockland Electric Co | Open Energy Information

    Open Energy Info (EERE)

    Data Utility Id 16213 Utility Location Yes Ownership I NERC Location NPCC NERC NPCC Yes RTO PJM Yes Activity Transmission Yes Activity Distribution Yes This article is a stub. You...

  20. Central Virginia Electric Coop | Open Energy Information

    Open Energy Info (EERE)

    Data Utility Id 3291 Utility Location Yes Ownership C NERC Location SERC NERC SERC Yes RTO PJM Yes Activity Distribution Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes This...

  1. _

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    00 G Street NW Suite 600 Washington, DC 20005 September 24, 2014 Scott Baker Sr. Business Solutions Analyst scott.baker@pjm.com (610) 666-2235 VIA EMAIL U.S. Department of Energy...

  2. Allegheny Energy Supply Co LLC | Open Energy Information

    Open Energy Info (EERE)

    RTO PJM Yes Operates Generating Plant Yes Activity Generation Yes Activity Wholesale Marketing Yes Activity Retail Marketing Yes This article is a stub. You can help OpenEI by...

  3. Electricity Advisory Committee Meeting Presentations October...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Robin Podmore, IncSys Eugene Litvinov, ISO-New England Tom O'Brien, PJM PDF icon Presentation to the EAC - Grid Modernization - Anjan Bose PDF icon Presentation to the EAC - Vision ...

  4. State and Regional Policy Assistance - Program Activities | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    practices" to regional electric bodies such as PJM, ISO-New England, NYISO, and states. ... Recommendations are implemented at the wholesale level by ISO-New England and under active ...

  5. Urgent Action on Energy Conservation Standards for Residential Water Heaters (Docket Number: EERE-2012-BT-STD-0022)

    Broader source: Energy.gov [DOE]

    I am submitting this letter on behalf of PJM Interconnection, the electric grid operator for 13 states and the District of Columbia serving over 60 million people.  As part of a coalition which...

  6. --No Title--

    U.S. Energy Information Administration (EIA) Indexed Site

    04, 2016
    Next Release Date: February 18, 2016 <---
    PJM West data for 2005-2012Re-released--->

  7. United States

    Office of Environmental Management (EM)

    1-C Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia to whom power may be transmitted and scheduled pursuant to contracts between the Government, American Electric Power Service Corporation (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. This rate schedule is applicable to customers receiving

  8. United States

    Office of Environmental Management (EM)

    2-C Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia to whom power may be transmitted pursuant to contracts between the Government, American Electric Power Service Corporation (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. The Customer has chosen to self-schedule and does not receive Government

  9. United States

    Office of Environmental Management (EM)

    3-C Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia to whom power may be scheduled pursuant to contracts between the Government, American Electric Power Service Corporation (hereinafter called the Company), PJM Interconnection LLC (hereinafter called PJM), and the Customer. The Government is responsible for providing the scheduling. The Customer is responsible for providing a transmission

  10. United States

    Energy Savers [EERE]

    4-C Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia served through the facilities of American Electric Power Service Corporation (hereinafter called the Company) and PJM Interconnection LLC (hereinafter called PJM). The Customer has chosen to self- schedule and does not receive Government power under an arrangement where the Company schedules the power and provides a credit on the Customer's

  11. United States

    Energy Savers [EERE]

    NC-1-C Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina to whom power may be transmitted pursuant to a contract between the Government and Virginia Electric and Power Company (hereinafter called the Virginia Power) and PJM Interconnection LLC (hereinafter called PJM), scheduled pursuant to a contract between the Government and Duke Energy Progress (formerly known as Carolina

  12. United States

    Energy Savers [EERE]

    1-C Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina to whom power may be transmitted and scheduled pursuant to contracts between the Government, Virginia Electric and Power Company (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. This rate schedule is applicable to customers

  13. United States

    Energy Savers [EERE]

    2-C Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina to whom power may be transmitted pursuant to contracts between the Government, Virginia Electric and Power Company (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. The Customer has chosen to self-schedule and does not receive

  14. United States

    Energy Savers [EERE]

    3-C Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina to whom power may be scheduled pursuant to contracts between the Government, Virginia Electric and Power Company (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. The Government is responsible for providing the scheduling. The

  15. United States

    Energy Savers [EERE]

    4-C Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina served through the transmission facilities of Virginia Electric and Power Company (hereinafter called the Company) and PJM Interconnection LLC (hereinafter called PJM). The Customer has chosen to self-schedule and does not receive Government power under an arrangement where the Company schedules the power and provides a

  16. KP-AP-4-C Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    AP-4-C Wholesale Power Rate Schedule KP-AP-4-C Wholesale Power Rate Schedule Area: American Electric Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia served through the facilities of American Electric Power Service Corporation (hereinafter called the Company) and PJM Interconnection LLC (hereinafter called PJM). This rate schedule shall be applicable to the sale at wholesale of

  17. KP-VA-4-C Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    4-C Wholesale Power Rate Schedule KP-VA-4-C Wholesale Power Rate Schedule Area: Virginia Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina served through the transmission facilities of Virginia Electric and Power Company (hereinafter called the Company) and PJM Interconnection LLC (hereinafter called PJM). This rate schedule shall be applicable to the sale at

  18. VA-4-B Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4-B Wholesale Power Rate Schedule VA-4-B Wholesale Power Rate Schedule Area: Virginia Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina served through the transmission facilities of Virginia Electric and Power Company (hereinafter called the Company) and PJM Interconnection LLC (hereinafter called PJM). This rate schedule shall be applicable to the sale at

  19. VANC-1 Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    VANC-1 Wholesale Power Rate Schedule VANC-1 Wholesale Power Rate Schedule This rate schedule shall be available to public bodies and cooperatives or their agents (any one of whom is hereinafter called the Customer) in North Carolina and Virginia to whom transmission is provided from the PJM Interconnection LLC (hereinafter called PJM) or Carolina Power & Light Company (hereinafter called CP&L). This rate schedule shall be applicable to transmission services provided and sold under

  20. Notification of Planned 230kV Outage at Potomac River Generating Station

    Energy Savers [EERE]

    Sent: Wednesday, May 16, 2007 4:49 PM To: #DOE_Notification@pepco.com Subject: Notification of Planned 230kV Outage at Potomac River Generating Station To Whom It May Concern: This morning Pepco and PJM observed that the generation at the Potomac River Generating Station was having difficulty matching the station generation requirement to the Potomac River area load. Mirant has also informed Pepco and PJM that several generating units were experiencing equipment problems which required them to

  1. KP-AP-3-C Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    3-C Wholesale Power Rate Schedule KP-AP-3-C Wholesale Power Rate Schedule Area: American Electric Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia to whom power may be scheduled pursuant to contracts between the Government, American Electric Power Service Corporation (hereinafter called the Company), PJM Interconnection LLC (hereinafter called PJM), and the Customer. This rate

  2. Microsoft Word - 112706 Final Outage Letter PUBLIC.doc

    Office of Environmental Management (EM)

    CRITICAL ENERGY INFRASTRUCTURE INFORMATION REMOVED FOR PRIVILEGED TREATMENT November 27, 2006 Lawrence Mansueti Office of Electricity Delivery and Energy Reliability U.S. Department of Energy Rm. 8H-033 1000 Independence Avenue Washington, D.C. 20585 Re: Potomac River Generating Station Department of Energy Case No. EO-05-01 Dear Mr. Mansueti: Potomac Electric Power Company ("Pepco"), on behalf of itself and PJM Interconnection, L.L.C. ("PJM"), is providing you with

  3. DOE_EnergyEfficiencyStandardsForLargeVolumeWaterHeaters.pdf

    Office of Environmental Management (EM)

    September 6, 2012 Scott Baker Sr. Business Solutions Analyst Bakers1@pjm.com (610) 666-2235 VIA EMAIL U.S. Department of Energy Email: expartecommunications@hq.doe.gov RE: Ex Parte Communication, Docket EERE-2012-BT-STD-0022 To whom it may concern, On September 5, 2012, representatives from PJM Interconnection LLC, National Rural Electric Cooperatives Association, Edison Electric Institute, American Public Power Association, and the Steffes Corporation (together, "Joint Commenters")

  4. DOE_Water_Heater_Meeting_111612.pdf

    Office of Environmental Management (EM)

    November 20, 2012 Scott Baker Sr. Business Solutions Analyst Bakers1@pjm.com (610) 666-2235 VIA EMAIL U.S. Department of Energy Email: expartecommunications@hq.doe.gov RE: Ex Parte Communication, Docket EERE-2012-BT-STD-0022 To whom it may concern, On November 16, 2012, representatives from PJM Interconnection LLC, National Rural Electric Cooperatives Association, Edison Electric Institute, American Public Power Association, Rheem and the Steffes Corporation (together, "Joint

  5. DE-AC05-00OR22800

    National Nuclear Security Administration (NNSA)

    ... NAP 70.2 07022010 PHYSICAL PROTECTION NAP 70.4 07022010 INFORMATION SECURITY OMB-Circular A-123 12212004 MANAGEMENT'S RESPONSIBILITY FOR INTERNAL CONTROL OPS-323 10212004 ...

  6. WRPS ATL DE-AC27-08RV14800

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Planning and Management DOE M 470.4-1, Chg 1 DOE M 470.4-2A, CRD DOE M 470.4-2A, Physical Protection DOE M 470.4-2A, DOE M 470.4-3 Protective Force DOE M 470.4-3 DOE M 470.4-4A ...

  7. Contract DE-AC05-00OR22800

    National Nuclear Security Administration (NNSA)

    ... NAP 70.2 07022010 PHYSICAL PROTECTION NAP 70.4 07022010 INFORMATION SECURITY OMB-Circular A-123 12212004 MANAGEMENT'S RESPONSIBILITY FOR INTERNAL CONTROL OPS-323 10212004 ...

  8. Contract No. DE-AC02-07CH11358

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... the reception and display of audiovisual signals received from terrestrial, cable, ... sources of energy, develop effective machinery to monitor environmental effects of ...

  9. Graphene-coated coupling coil for AC resistance reduction

    DOE Patents [OSTI]

    Miller, John M

    2014-03-04

    At least one graphene layer is formed to laterally surround a tube so that the basal plane of each graphene layer is tangential to the local surface of the tube on which the graphene layer is formed. An electrically conductive path is provided around the tube for providing high conductivity electrical path provided by the basal plane of each graphene layer. The high conductivity path can be employed for high frequency applications such as coupling coils for wireless power transmission to overcome skin depth effects and proximity effects prevalent in high frequency alternating current paths.

  10. SF 6110-AC Residual Inventory of Material or Equipment Furnished...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Specification No. and whether item is Classified, Furnished, Acquired, Esplosive, Toxic, Raw Mat'l, Good Part, or Scrap. The above listing is a COMPLETE inventory of residual...

  11. Contract DE-AC06-08RL14788

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Projects and Construction M. N. Jaraysi Vice President for Environmental Program and Strategic Planning CHPRC Monthly Performance Report December 2011 D1 CHPRC-2011-12, Rev. 0...

  12. Contract DE-AC06-08RL14788

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    were completed. Initial review of the conceptual design began in November. Continued sediment load-out of 183.2KE Basin. Continued with erecting, scaffolding and demolition...

  13. Demodulation circuit for AC motor current spectral analysis

    DOE Patents [OSTI]

    Hendrix, Donald E. (Oak Ridge, TN); Smith, Stephen F. (Knoxville, TN)

    1990-12-18

    A motor current analysis method for the remote, noninvasive inspection of electric motor-operated systems. Synchronous amplitude demodulation and phase demodulation circuits are used singly and in combination along with a frequency analyzer to produce improved spectral analysis of load-induced frequencies present in the electric current flowing in a motor-driven system.

  14. Quenching of the initial ac Susceptibility in Single Domain Ni...

    Office of Scientific and Technical Information (OSTI)

    allowing an unambiguous determination of the magnetic state of the nanostructure and a clean separation of different contributions to its dynamic properties. For example, an...

  15. "Permanent Magnet Generator-like AC Current Drive for Torroidal...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fusion Devices" Inventor..--.. Ali Zolfaghari The scheme is similar to a permanent magnet generator. Large strong permanent magnets placed toroidally on the outside of a torus are...

  16. CenterPoint Energy A/C Distributor Program

    Broader source: Energy.gov [DOE]

    Note:  This incentive is only available to customers within CenterPoint Energy’s electric service territory (greater Houston area, Texas)

  17. Superconductor films with improved flux pinning and reduced AC losses

    DOE Patents [OSTI]

    Goyal, Amit (Knoxville, TN)

    2011-04-05

    The present invention relates to a method for producing a defect-containing superconducting film, the method comprising (a) depositing a phase-separable layer epitaxially onto a biaxially-textured substrate, wherein the phase-separable layer includes at least two phase-separable components; (b) achieving nanoscale phase separation of the phase-separable layer such that a phase-separated layer including at least two phase-separated components is produced; and (c) depositing a superconducting film epitaxially onto said phase-separated components of the phase-separated layer such that nanoscale features of the phase-separated layer are propagated into the superconducting film.

  18. Motion characteristics of long ac arcs in atmospheric air

    SciTech Connect (OSTI)

    Gu Shanqiang; He Jinliang; Zeng Rong; Zhang Bo; Xu Guozheng; Chen Weijiang

    2007-01-29

    Experiments on the motion of long alternating current arcs in atmospheric air show that the anode and cathode arc roots have different motion characteristics because of different formation mechanisms. During a half cycle of the arc current, the anode arc root moves towards the direction of magnetic force and occasionally has a jumping motion, while the cathode arc root moves sufficiently slow to consider it stationary and hardly has any jump. The arc column has a complex shape and moves under the drive of the magnetic force and is also quickened by the lower arc root.

  19. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    784 See Block 16C 0533 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item

  20. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Item #3 See Block 16C 0536 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in

  1. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Items 0001 and 0002 041152224 OAK RIDGE ASSOCIATED UNIVERSITIES, INC. 00516 Oak Ridge TN 37831 P.O. Box 2008 ORNL Site Office U.S. Department of Energy 16SC000275 11/24/2015 0548 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date

  2. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Item 0003 041152224 OAK RIDGE ASSOCIATED UNIVERSITIES, INC. 00516 Oak Ridge TN 37831 P.O. Box 2008 ORNL Site Office U.S. Department of Energy 16SC000275 See Block 16C 0549 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified

  3. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    16SC000486 Line Item # 1 041152224 OAK RIDGE ASSOCIATED UNIVERSITIES, INC. 00516 Oak Ridge TN 37831 P.O. Box 2008 ORNL Site Office U.S. Department of Energy 16SC000486 Line Item # 1 See Block 16C 0551 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to

  4. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    , Line Item 001 See Block 16C 0554 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing The above numbered solicitation is amended as set

  5. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Line Item 0002 See Block 16C 0555 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing The above numbered solicitation is amended as set

  6. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 See Block 16C 0557 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item

  7. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 See Block 16C 0558 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item

  8. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    041152224 OAK RIDGE ASSOCIATED UNIVERSITIES, INC. 00518 Oak Ridge TN 37831 P.O. Box 2001 U.S. Department of Energy Oak Ridge 00518 Oak Ridge TN 37831 P.O. Box 2001 U.S. Department of Energy Oak Ridge 10SC002592 See Block 16C 129 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt

  9. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    585 See Block 16C 101 6 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item

  10. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1615 See Block 16C 102 7 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item

  11. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2153 See Block 16C 105 8 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item

  12. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    10EM000030 See Block 16C 107 5 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in

  13. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    335 See Block 16C 109 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item

  14. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    534 See Block 16C 110 3 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item

  15. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 ROCKVILLE MD 208506247 053506312 COMPUTER SCIENCES CORPORATION Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office 10EM002050 See Block 16C 115 8 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND

  16. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Not Applicable ROCKVILLE MD 208506247 053506312 COMPUTER SCIENCES CORPORATION Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office 10EM003531 See Block 16C 121 20 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12.

  17. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    N/A ROCKVILLE MD 208506247 053506312 COMPUTER SCIENCES CORPORATION Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office 10EM003731 See Block 16C 122 60 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING

  18. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    169 See Block 16C 126 4 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item

  19. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    586 11/30/2010 129 4 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item 14.

  20. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 ROCKVILLE MD 208506247 053506312 COMPUTER SCIENCES CORPORATION Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office 11EM000721 See Block 16C 130 3 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND